Sample records for tank operations contractor

  1. Configuration Management Plan for the Tank Farm Contractor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    WEIR, W.R.

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in themore » management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.« less

  2. 76 FR 49650 - Private Security Contractors (PSCs) Operating in Contingency Operations, Combat Operations or...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-11

    ...] Private Security Contractors (PSCs) Operating in Contingency Operations, Combat Operations or Other..., ``Contractor Personnel Authorized to Accompany the U.S. Armed Forces,'' which provides guidance for all DoD contractors operating in contingency operations. This Rule was published as an Interim Final Rule on July 17...

  3. Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Honeyman, J.O.

    1998-01-09

    This Management Assessment of Tank Waste Remediation System (TWRS) Contractor Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technicalmore » Baselines, work breakdown structures, tank farms organizational structure and configurations, work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on-line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined.« less

  4. Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Certa, P.J.

    1998-01-07

    Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technical Baselines, work breakdown structures, tank farms organizational structure and configurations,more » work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined.« less

  5. Battlefield Contractors: Operational Risk and System Support Contractors

    DTIC Science & Technology

    2010-10-27

    incentive for the use of contractors is the proven cost savings when compared to similarly trained active duty military forces. The Office of...no military or government civilian is trained to do. The reality is that “modern military operations now depend heavily on high-tech weapons systems...squadrons that rely exclusively on contracted line maintenance, with no military personnel trained to support the aircraft. Defense supplemental funds

  6. 32 CFR 806b.6 - Systems of records operated by a contractor.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 6 2014-07-01 2014-07-01 false Systems of records operated by a contractor... ADMINISTRATION PRIVACY ACT PROGRAM Overview of the Privacy Act Program § 806b.6 Systems of records operated by a contractor. Contractors who are required to operate or maintain a Privacy Act system of records by contract...

  7. 32 CFR 806b.6 - Systems of records operated by a contractor.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 6 2011-07-01 2011-07-01 false Systems of records operated by a contractor... ADMINISTRATION PRIVACY ACT PROGRAM Overview of the Privacy Act Program § 806b.6 Systems of records operated by a contractor. Contractors who are required to operate or maintain a Privacy Act system of records by contract...

  8. 32 CFR 806b.6 - Systems of records operated by a contractor.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Systems of records operated by a contractor... ADMINISTRATION PRIVACY ACT PROGRAM Overview of the Privacy Act Program § 806b.6 Systems of records operated by a contractor. Contractors who are required to operate or maintain a Privacy Act system of records by contract...

  9. 32 CFR 806b.6 - Systems of records operated by a contractor.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 6 2012-07-01 2012-07-01 false Systems of records operated by a contractor... ADMINISTRATION PRIVACY ACT PROGRAM Overview of the Privacy Act Program § 806b.6 Systems of records operated by a contractor. Contractors who are required to operate or maintain a Privacy Act system of records by contract...

  10. 32 CFR 806b.6 - Systems of records operated by a contractor.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 6 2013-07-01 2013-07-01 false Systems of records operated by a contractor... ADMINISTRATION PRIVACY ACT PROGRAM Overview of the Privacy Act Program § 806b.6 Systems of records operated by a contractor. Contractors who are required to operate or maintain a Privacy Act system of records by contract...

  11. Enabling Operational Reach and Endurance: The Use of Contractors During World War II

    DTIC Science & Technology

    2016-05-26

    Enabling Operational Reach and Endurance: The Use of Contractors During World War II A...TITLE AND SUBTITLE 5a. CONTRACT NUMBER Enabling Operational Reach and Endurance: The Use of Contractors During World War II 5b. GRANT NUMBER 5c...Army Operating Concept does not address the use or incorporation of contractors to augment force structure in the event of a militarized response

  12. An Operational Commander’s Guide to Contractors on the Battlefield

    DTIC Science & Technology

    2007-05-10

    Operational Law Handbook, Charlottesville, VA: 2005, 145. 12 R. R. Vernon, “Battlefield Contractors: Facing Tough Issues,” Public Contract Law Journal...Operations. Joint Pub 4-0. Washington, DC: 6 April 2000. Vernon, R. R. “Battlefield Contractors: Facing Tough Issues.” Public Contract Law Journal, Vol. 33 (Winter 2004): 404-421.

  13. Structured Transition of Wind Tunnel Operations Skills from Government-to Contractor-Managed

    NASA Technical Reports Server (NTRS)

    Dunn, Steven C.; Schlank, John J.

    2010-01-01

    In 2004, NASA awarded the Research, Operations, Maintenance, and Engineering (ROME) contract at NASA Langley Research Center to a team led by Jacobs Technology, Inc. A key component of the contract was the transitioning of the five large wind tunnel facilities from NASA managed and NASA or NASA/contractor workforces to fully contractor operated. The contractor would manage daily operations while NASA would continue to develop long-term strategies, make decisions regarding commitment of funds and commitment of facilities, and provide oversight of the contractor's performance. A major challenge would be the transition of knowledge of facility operations and maintenance from the incumbent civil servant workforce to the contractor workforce. While the contract has since been modified multiple times, resulting in a blended NASA/ROME workforce across the facilities, the processes developed and implemented to capture and document facility knowledge from the incumbent subject matter experts, build training and certification programs, and grow individual skills across subject areas and across facilities, are worthy of documentation. This is the purpose of this paper.

  14. Data quality objectives for TWRS privatization phase 1: confirm tank T is an appropriate feed source for high-level waste feed batch X

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NGUYEN, D.M.

    1999-06-01

    The U.S. Department of Energy-Richland Operations Office (DOE-RL) has initiated Phase 1 of a two-phase privatization strategy for treatment and immobilization of high-level waste (HLW) that is currently managed by the Hanford Tank Waste Remediation System (TWRS) Project. In this strategy, DOE will purchase services from a contractor-owned and operated facility under a fixed price. The Phase 1 TWRS privatization contract requires that the Project Hanford Management Contract (PHMC) contractors, on behalf of DOE, deliver HLW feed in specified quantities and composition to the Privatization Contractor in a timely manner (DOE-RL 1996). Additional requirements are imposed by the interface controlmore » document (ICD) for HLW feed (PHMC 1997). In response to these requirements, the Tank Waste Remediation System Operation and Utilization Plan (TWRSO and UP) (Kirkbride et al. 1997) was prepared by the PHMC. The TWRSO and UP, as updated by the Readiness-To-Proceed (RTP) deliverable (Payne et al. 1998), establishes the baseline operating scenario for the delivery of HLW feed to the Privatization Contractor. The scenario specifies tanks from which HLW will be provided for each feed batch, the operational activities needed to prepare and deliver each batch, and the timing of these activities. The operating scenario was developed based on current knowledge of waste composition and chemistry, waste transfer methods, and operating constraints such as tank farm logistics and availability of tank space. A project master baseline schedule (PMBS) has been developed to implement the operating scenario. The PMBS also includes activities aimed at reducing programmatic risks. One of the activities, ''Confirm Tank TI is Acceptable for Feed,'' was identified to verify the basis used to develop the scenario Additional data on waste quantity, physical and chemical characteristics, and transfer properties will be needed to support this activity. This document describes the data quality

  15. 40 CFR 280.230 - Operating an underground storage tank or underground storage tank system.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... underground storage tank or underground storage tank system. (a) Operating an UST or UST system prior to...) Operating an UST or UST system after foreclosure. The following provisions apply to a holder who, through..., the purchaser must decide whether to operate or close the UST or UST system in accordance with...

  16. 40 CFR 280.230 - Operating an underground storage tank or underground storage tank system.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... underground storage tank or underground storage tank system. (a) Operating an UST or UST system prior to...) Operating an UST or UST system after foreclosure. The following provisions apply to a holder who, through..., the purchaser must decide whether to operate or close the UST or UST system in accordance with...

  17. 40 CFR 280.230 - Operating an underground storage tank or underground storage tank system.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... underground storage tank or underground storage tank system. (a) Operating an UST or UST system prior to...) Operating an UST or UST system after foreclosure. The following provisions apply to a holder who, through..., the purchaser must decide whether to operate or close the UST or UST system in accordance with...

  18. 40 CFR 280.230 - Operating an underground storage tank or underground storage tank system.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... underground storage tank or underground storage tank system. (a) Operating an UST or UST system prior to...) Operating an UST or UST system after foreclosure. The following provisions apply to a holder who, through..., the purchaser must decide whether to operate or close the UST or UST system in accordance with...

  19. 40 CFR 280.230 - Operating an underground storage tank or underground storage tank system.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... underground storage tank or underground storage tank system. (a) Operating an UST or UST system prior to...) Operating an UST or UST system after foreclosure. The following provisions apply to a holder who, through..., the purchaser must decide whether to operate or close the UST or UST system in accordance with...

  20. 40 CFR 63.651 - Marine tank vessel loading operation provisions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 11 2013-07-01 2013-07-01 false Marine tank vessel loading operation... Marine tank vessel loading operation provisions. (a) Except as provided in paragraphs (b) through (d) of this section, each owner or operator of a marine tank vessel loading operation located at a petroleum...

  1. 40 CFR 63.651 - Marine tank vessel loading operation provisions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 10 2010-07-01 2010-07-01 false Marine tank vessel loading operation... Marine tank vessel loading operation provisions. (a) Except as provided in paragraphs (b) through (d) of this section, each owner or operator of a marine tank vessel loading operation located at a petroleum...

  2. Operational Plan for Underground Storage Tank 322 R2U2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Griffin, D.

    2017-06-07

    This Operational Plan provides the operator of the tank system with guidelines relating to the safe and compliant operation and maintenance of the tank system. The tank system schematic and list of emergency contacts shall be posted near the tank so they are visible to tank personnel. This Operational Plan shall be kept on file by the Facility Supervisor. It should be understood when managing this tank system that it is used to store hazardous waste temporarily for 90 calendar days or less. The rinsewater handled in the tank system is considered hazardous and may exhibit the characteristic of toxicity.

  3. Data quality objectives for TWRS privatization phase 1: confirm tank T is an appropriate feed source for low-activity waste feed batch X

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NGUYEN, D.M.

    1999-06-01

    The US. Department of Energy, Richland Operations Office (DOE-RL) has initiated Phase 1 of a two-phase privatization strategy for treatment and immobilization of low-activity waste (LAW) currently being managed by the Hanford Tank Waste Remediation System (TWRS) Project. In this strategy, DOE will purchase services from a contractor-owned and operated facility under a fixed price. The Phase 1 TWRS privatization contract requires that the Project Hanford Management Contract (PHMC) contractors, on behalf of DOE, deliver LAW feed in specified quantities and composition to the Privatization Contractor in a timely manner (DOE-RL 1996). Additional requirements are imposed by the interface controlmore » document (ICD-19) for LAW feed (PHMC 1997). In response to these requirements, the Tank Waste Remediation System Operation and Utilization Plan (TWRSO and UP) (Kirkbride et al. 1997) was prepared by the PHMC. The TWRSO and UP, as updated by the Readiness-To-Proceed deliverable (Payne et al. 1998), establishes the baseline operating scenario for the delivery of LAW feed to the Privatization Contractor. The scenario specifies tanks from which LAW will be provided for each feed batch, the operational activities needed to prepare and deliver each batch, and the timing of these activities. The operating scenario was developed based on current knowledge of waste composition and chemistry, waste transfer methods, and operating constraints, such as tank farm logistics and availability of tank space. A project master baseline schedule (PMBS) has been developed to implement the operating scenario. The PMBS also includes activities aimed at reducing programmatic risks. One of the activities, ''Confirm Plans and Requirements,'' was identified to verify the basis used to develop the scenario. Additional data on waste quantity, physical and chemical characteristics, and transfer properties will be needed to support this activity. This document describes the data quality objective (DQO

  4. Management and operating contractors' pension plans

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1987-06-01

    This report concerns the management of 28 M and O contractor pension plans with assets exceeding $2.6 billion in 1983. At the end of 1983, these pension plans were overfunded by $600 million. The Department could have saved $94 million in 1983 had the contractors been required to limit their pension plan contributions to the Government-established minimum level. Since 1979, the Department has continually reimbursed these contractors for contributions to pension plans that were already overfunded and we estimate that these plans are currently overfunded in excess of $1 billion. Additional annual savings of about $548,000 could be realized ifmore » the Department obtained waivers for M and O contractors participating in the Pension Benefit Guaranty Corporation's (PBGC) insurance program. Management and Administration, which has overall responsibility for controlling such costs, indicated it did not agree that contractors should fund pension plans at only the minimum required level. General agreement was indicated with the need to obtain waivers from PBGC premiums and better protect the Department's interest in contractor excess pension assets.« less

  5. Improved Management of the Technical Interfaces Between the Hanford Tank Farm Operator and the Hanford Waste Treatment Plant - 13383

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Duncan, Garth M.; Saunders, Scott A.

    2013-07-01

    The Department of Energy (DOE) is constructing the Waste Treatment and Immobilization Plant (WTP) at the Hanford site in Washington to treat and immobilize approximately 114 million gallons of high level radioactive waste (after all retrievals are accomplished). In order for the WTP to be designed and operated successfully, close coordination between the WTP engineering, procurement, and construction contractor, Bechtel National, Inc. and the tank farms operating contractor (TOC), Washington River Protection Solutions, LLC, is necessary. To develop optimal solutions for DOE and for the treatment of the waste, it is important to deal with the fact that two differentmore » prime contractors, with somewhat differing contracts, are tasked with retrieving and delivering the waste and for treating and immobilizing that waste. The WTP and the TOC have over the years cooperated to manage the technical interface. To manage what is becoming a much more complicated interface as the WTP design progresses and new technical issues have been identified, an organizational change was made by WTP and TOC in November of 2011. This organizational change created a co-located integrated project team (IPT) to deal with mutual and interface issues. The Technical Organization within the One System IPT includes employees from both TOC and WTP. This team has worked on a variety of technical issues of mutual interest and concern. Technical issues currently being addressed include: - The waste acceptance criteria; - Waste feed delivery and the associated data quality objectives (DQO); - Evaluation of the effects of performing a riser cut on a single shell tank on WTP operations; - The disposition of secondary waste from both TOC and WTP; - The close coordination of the TOC double shell tank mixing and sampling program and the Large Scale Integrated Test (LSIT) program for pulse jet mixers at WTP along with the associated responses to the Defense Nuclear Facilities Safety Board (DNFSB

  6. STS-114: Discovery Tanking Operations for Launch

    NASA Technical Reports Server (NTRS)

    2005-01-01

    Jessica Rye from NASA Public Affairs is the narrator for the tanking operations for the launch of the Space Shuttle Discovery. She presents a video of the arrival and processing of the new external tank at the Kennedy Space Center. The external tank is also shown entering the Vehicle Assembly Building (VAB). The external tank underwent new processing resulting from its redesign including inspection of the bipod heater and the external separation camera. The changes to the external tank include: 1) Electric heaters to protect from icing; and 2) Liquid Oxygen feed line bellows to carry fuel from the external tank to the Orbiter. Footage of the external tank processing facility at NASA's Michoud Assembly Facility in New Orleans, La. prior to its arrival at Kennedy Space Center is shown and a video of the three key modifications to the external tank including the bipod, flange and bellows are shown.

  7. Migrant and Seasonal Agricultural Worker Protection Act: Forestry contractors' model operating plan

    Treesearch

    Dan Bremer

    2007-01-01

    The Model Operating Plan for forestry contractors is a voluntary plan for compliance with the Migrant and Seasonal Agricultural Worker Protection Act (MSPA) of 1983, with amendments passed in 1996 and 1997. This plan is designed as a guide for forestry contractors who wish to comply with all federal, state, and local rules and regulations that govern their employer/...

  8. Alternatives generation and analysis for double-shell tank primary ventilation systems emissions control and monitoring

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    SEDERBURG, J.P.

    1999-09-30

    This AGA addresses the question: ''What equipment upgrades, operational changes, and/or other actions are required relative to the DST tanks farms' ventilation systems to support retrieval, staging (including feed sampling), and delivery of tank waste to the Phase I private contractor?'' Issues and options for the various components within the ventilation subsystem affect each other. Recommended design requirements are presented and the preferred alternatives are detailed.

  9. The Army Did Not Effectively Monitor Contractor Performance for the Kuwait Base Operations and Security Support Services Contract

    DTIC Science & Technology

    2017-03-07

    H 7 , 2 0 1 7 Report No. DODIG-2017-062 The Army Did Not Effectively Monitor Contractor Performance for the Kuwait Base Operations and Security...The Army Did Not Effectively Monitor Contractor Performance for the Kuwait Base Operations and Security Support Services Contract March 7, 2017... contractor performance for the Kuwait Base Operations and Security Support Services (KBOSSS) contract. The KBOSSS contract is a cost-plus-award-fee

  10. Development of a Thermodynamic Model for the Hanford Tank Waste Operations Simulator - 12193

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carter, Robert; Seniow, Kendra

    The Hanford Tank Waste Operations Simulator (HTWOS) is the current tool used by the Hanford Tank Operations Contractor for system planning and assessment of different operational strategies. Activities such as waste retrievals in the Hanford tank farms and washing and leaching of waste in the Waste Treatment and Immobilization Plant (WTP) are currently modeled in HTWOS. To predict phase compositions during these activities, HTWOS currently uses simple wash and leach factors that were developed many years ago. To improve these predictions, a rigorous thermodynamic framework has been developed based on the multi-component Pitzer ion interaction model for use with severalmore » important chemical species in Hanford tank waste. These chemical species are those with the greatest impact on high-level waste glass production in the WTP and whose solubility depends on the processing conditions. Starting with Pitzer parameter coefficients and species chemical potential coefficients collated from open literature sources, reconciliation with published experimental data led to a self-consistent set of coefficients known as the HTWOS Pitzer database. Using Gibbs energy minimization with the Pitzer ion interaction equations in Microsoft Excel,1 a number of successful predictions were made for the solubility of simple mixtures of the chosen species. Currently, this thermodynamic framework is being programmed into HTWOS as the mechanism for determining the solid-liquid phase distributions for the chosen species, replacing their simple wash and leach factors. Starting from a variety of open literature sources, a collection of Pitzer parameters and species chemical potentials, as functions of temperature, was tested for consistency and accuracy by comparison with available experimental thermodynamic data (e.g., osmotic coefficients and solubility). Reconciliation of the initial set of parameter coefficients with the experimental data led to the development of the self

  11. 48 CFR 970.5227-11 - Patent rights-management and operating contracts, for-profit contractor, non-technology transfer.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... and operating contracts, for-profit contractor, non-technology transfer. 970.5227-11 Section 970.5227...-technology transfer. Insert the following clause in solicitations and contracts in accordance with 970.2703-1(b)(4): Patent Rights—Management and Operating Contracts, for-Profit Contractor, Non-Technology...

  12. Excessive Profits of German Defense Contractors

    DTIC Science & Technology

    2014-09-01

    its business unit Thyssen Krupp Marine Systems, is a German defense contractor. (2) Tognom AG Tognum AG owned the MTU Friedrichshafen GmbH before... Friedrichshafen provided engines for many ships of the German Navy and for German battle tanks, such as the Leopard I and Leopard II. MTU refers to the

  13. 48 CFR 970.0371 - Conduct of employees of DOE management and operating contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... DOE management and operating contractors. 970.0371 Section 970.0371 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal Conflicts of Interest 970.0371 Conduct of employees of DOE...

  14. 48 CFR 970.0371 - Conduct of employees of DOE management and operating contractors.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Conduct of employees of DOE management and operating contractors. 970.0371 Section 970.0371 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS...

  15. High level waste tank closure project: ALARA applications at the Idaho National Engineering and Environmental Laboratory.

    PubMed

    Aitken, Steven B; Butler, Richard; Butterworth, Steven W; Quigley, Keith D

    2005-05-01

    Bechtel BWXT Idaho, Maintenance and Operating Contractor for the Department of Energy at the Idaho National Engineering and Environmental Laboratory, has emptied, cleaned, and sampled six of the eleven 1.135 x 10(6) L high level waste underground storage tanks at the Idaho Nuclear Technology and Engineering Center, well ahead of the State of Idaho Consent Order cleaning schedule. Cleaning of a seventh tank is expected to be complete by the end of calendar year 2004. The tanks, with associated vaults, valve boxes, and distribution systems, are being closed to meet Resource Conservation and Recovery Act regulations and Department of Energy orders. The use of remotely operated equipment placed in the tanks through existing tank riser access points, sampling methods and application of as-low-as-reasonably-achievable (ALARA) principles have proven effective in keeping personnel dose low during equipment removal, tank, vault, and valve box cleaning, and sampling activities, currently at 0.03 Sv.

  16. Analysis of non-fatal and fatal injury rates for mine operator and contractor employees and the influence of work location.

    PubMed

    Karra, Vijia K

    2005-01-01

    Mining injury surveillance data are used as the basis for assessing the severity of injuries among operator and contractor employees in the underground and surface mining of various minerals. Injury rates during 1983-2002 derived from Mine Safety and Health Administration (MSHA) database are analyzed using the negative binomial regression model. The logarithmic mean injury rate is expressed as a linear function of seven indicator variables representing Non-Coal Contractor, Metal Operator, Non Metal Operator, Stone Operator, Sand and Gravel Operator, Coal Contractor, and Work Location, and a continuous variable, RelYear, representing the relative year starting with 1983 as the base year. Based on the model, the mean injury rate declined at a 1.69% annual rate, and the mean injury rate for work on the surface is 52.53% lower compared to the rate for work in the underground. With reference to the Coal Operator mean injury rate: the Non-Coal Contractor rate is 30.34% lower, the Metal Operator rate is 27.18% lower, the Non-Metal Operator rate is 37.51% lower, the Stone Operator rate is 23.44% lower, the Sand and Gravel Operator rate is 16.45% lower, and the Coal Contractor rate is 1.41% lower. Fatality rates during the same 20 year period are analyzed similarly using Poisson regression model. Based on this model, the mean fatality rate declined at a 3.17% annual rate, and the rate for work on the surface is 64.3% lower compared to the rate for work in the underground. With reference to the Coal Operator mean fatality rate: the Non-Coal Contractor rate is 234.81% higher, the Metal Operator rate is 5.79% lower, the Non-Metal Operator rate is 47.36% lower, the Stone Operator rate is 8.29% higher, the Sand and Gravel Operator rate is 60.32% higher, and the Coal Contractor rate is 129.54% higher.

  17. Project W-211, initial tank retrieval systems, retrieval control system software configuration management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    RIECK, C.A.

    1999-02-23

    This Software Configuration Management Plan (SCMP) provides the instructions for change control of the W-211 Project, Retrieval Control System (RCS) software after initial approval/release but prior to the transfer of custody to the waste tank operations contractor. This plan applies to the W-211 system software developed by the project, consisting of the computer human-machine interface (HMI) and programmable logic controller (PLC) software source and executable code, for production use by the waste tank operations contractor. The plan encompasses that portion of the W-211 RCS software represented on project-specific AUTOCAD drawings that are released as part of the C1 definitive designmore » package (these drawings are identified on the drawing list associated with each C-1 package), and the associated software code. Implementation of the plan is required for formal acceptance testing and production release. The software configuration management plan does not apply to reports and data generated by the software except where specifically identified. Control of information produced by the software once it has been transferred for operation is the responsibility of the receiving organization.« less

  18. 48 CFR 252.229-7004 - Status of contractors as a direct contractor (Spain).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., development, maintenance, and operation of Spanish-American installations and facilities. (b) The Contractor... this contract by reference. (c) The Contractor shall apply to the appropriate Spanish authorities for approval of status as a Direct Contractor in order to complete duty-free import of non-Spanish equipment...

  19. 48 CFR 970.4402 - Contractor purchasing system.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor purchasing... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Management and Operating Contractor Purchasing 970.4402 Contractor purchasing system. ...

  20. 2005 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    D. Shanklin

    2006-07-19

    This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report describes inspection and monitoring activities fro the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action is functioning adequately to meet the objectives stated in the Operable Unit 3-13,more » Record of Decision for the Group 1, Tank Farm Interim Action, (DOE/ID-10660) and as amended by the agreement to resolve dispute, which was effective in February 2003.« less

  1. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LESKO KF; BERRIOCHOA MV

    2010-02-26

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installationmore » of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are

  2. 2006 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    D. E. Shanklin

    2007-02-14

    This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report covers the time period from January 1 through December 31, 2006, and describes inspection and monitoring activities for the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action ismore » functioning adequately to meet the objectives stated in the Operable Unit 3-13, Record of Decision for the Group 1, Tank Farm Interim Action (DOE/ID-10660) as described in the Group 1 Remedial Design/Remedial Action Work Plan (DOE/ID-10772).« less

  3. Maintenance and operations contractor plan for transition to the project Hanford management contract (PHMC)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Waite, J.L.

    1996-04-12

    This plan has been developed by Westinghouse Hanford Company (WHC), and its subcontractors ICF Kaiser Hanford (ICF KH) and BCS Richland, Inc. (BCSR), at the direction of the US Department of Energy (DOE), Richland Operations Office (RL). WHC and its subcontractors are hereafter referred to as the Maintenance and Operations (M and O) Contractor. The plan identifies actions involving the M and O Contractor that are critical to (1) prepare for a smooth transition to the Project Hanford Management Contractor (PHMC), and (2) support and assist the PHMC and RL in achieving transition as planned, with no or minimal impactmore » to ongoing baseline activities. The plan is structured around two primary phases. The first is the pre-award phase, which started in mid-February 1996 and is currently scheduled to be completed on June 1, 1996, at which time the contract is currently planned to be awarded. The second is the follow-on four-month post-award phase from June 1, 1996, until October 1, 1996. Considering the magnitude and complexity of the scope of work being transitioned, completion in four months will require significant effort by all parties. To better ensure success, the M and O Contractor has developed a pre-award phase that is intended to maximize readiness for transition. Priority is given to preparation for facility assessments and processing of personnel, as these areas are determined to be on the critical path for transition. In addition, the M and O Contractor will put emphasis during the pre-award phase to close out open items prior to contract award, to include grievances, employee concerns, audit findings, compliance issues, etc.« less

  4. 49 CFR 199.245 - Contractor employees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Contractor employees. 199.245 Section 199.245... Prevention Program § 199.245 Contractor employees. (a) With respect to those covered employees who are contractors or employed by a contractor, an operator may provide by contract that the alcohol testing...

  5. 49 CFR 199.115 - Contractor employees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Contractor employees. 199.115 Section 199.115... § 199.115 Contractor employees. With respect to those employees who are contractors or employed by a contractor, an operator may provide by contract that the drug testing, education, and training required by...

  6. 40 CFR 267.201 - What must I do when I stop operating the tank system?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... OPERATING UNDER A STANDARDIZED PERMIT Tank Systems § 267.201 What must I do when I stop operating the tank... 40 Protection of Environment 28 2012-07-01 2012-07-01 false What must I do when I stop operating the tank system? 267.201 Section 267.201 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...

  7. 40 CFR 267.201 - What must I do when I stop operating the tank system?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... OPERATING UNDER A STANDARDIZED PERMIT Tank Systems § 267.201 What must I do when I stop operating the tank... 40 Protection of Environment 28 2013-07-01 2013-07-01 false What must I do when I stop operating the tank system? 267.201 Section 267.201 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...

  8. 40 CFR 267.201 - What must I do when I stop operating the tank system?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OPERATING UNDER A STANDARDIZED PERMIT Tank Systems § 267.201 What must I do when I stop operating the tank... 40 Protection of Environment 26 2010-07-01 2010-07-01 false What must I do when I stop operating the tank system? 267.201 Section 267.201 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...

  9. 40 CFR 267.201 - What must I do when I stop operating the tank system?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... OPERATING UNDER A STANDARDIZED PERMIT Tank Systems § 267.201 What must I do when I stop operating the tank... 40 Protection of Environment 27 2011-07-01 2011-07-01 false What must I do when I stop operating the tank system? 267.201 Section 267.201 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...

  10. 40 CFR 267.201 - What must I do when I stop operating the tank system?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... OPERATING UNDER A STANDARDIZED PERMIT Tank Systems § 267.201 What must I do when I stop operating the tank... 40 Protection of Environment 27 2014-07-01 2014-07-01 false What must I do when I stop operating the tank system? 267.201 Section 267.201 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...

  11. 4 CFR 83.19 - Government contractors.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 4 Accounts 1 2010-01-01 2010-01-01 false Government contractors. 83.19 Section 83.19 Accounts... contractors. When GAO provides by a contract for the operation by or on behalf of GAO of a system of personnel... of this part to be applied to such system. Any such contractor and any employee of such contractor...

  12. Contractors on Deployed Military Operations: United Kingdom Policy and Doctrine

    DTIC Science & Technology

    2005-09-01

    contractor’s workforce than military personnel, and contractors cannot be disciplined for violations of the Uniform Code of Military Justice.101 Moreover...objectives are met.151 The MoD’s “Defence Agencies” currently employ 60 percent of MoD’s civilian workforce and 11 percent of total uniformed personnel...operations by staff drawn from the contractor’s workforce who are reservist members of the Armed Forces.”177 With these initiatives, MoD assumes it has

  13. 32 CFR 1701.16 - Contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Contractors. 1701.16 Section 1701.16 National... Under the Privacy Act of 1974 § 1701.16 Contractors. (a) Any approved contract for the operation of a... prescribed by the Federal Acquisition Regulations (FAR) at 48 CFR part 24, requiring the contractor to comply...

  14. Skylab checkout operations. [from multiple docking adapter contractor viewpoint

    NASA Technical Reports Server (NTRS)

    Timmons, K. P.

    1973-01-01

    The Skylab Program at Kennedy Space Center presented many opportunities for interesting and profound test and checkout experience. It also offered a compilation of challenges and promises for the Center and for the contractors responsible for the various modules making up Skylab. It is very probable that the various contractors had common experiences during the module and combined systems tests, but this paper will discuss those experiences from the viewpoint of the Multiple Docking Adapter contractor. The experience will consider personnel, procedures, and hardware.

  15. 30 CFR 45.4 - Independent contractor register.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Independent contractor register. 45.4 Section... ADMINISTRATIVE REQUIREMENTS INDEPENDENT CONTRACTORS § 45.4 Independent contractor register. (a) Each independent contractor shall provide the production-operator in writing the following information: (1) The independent...

  16. Preliminary remedial action objectives for the Tank 16 groundwater operable unit

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miles, W.C. Jr.

    1992-10-28

    Tank 16 is a High Level Radioactive Waste tank in the H-Area Tank Farm on the Savannah River Site that was placed into service in May 1959. A leak was detected in one of the construction weld joints while the tank was being filled. Before jet evacuation of the tank waste was completed, the leak overflowed the annulus pan and an estimated 16 to 700 gallons of waste escaped to the environment (soil and groundwater) over a six hour period contaminating approximately 1,600--70,000 cubic feet of soil with up to 5000 curies of activity (principally Cs[sup 137]). The Tank 16more » bottom is constructed below the groundwater table which resulted in almost immediate contamination of that medium. Low groundwater flow rates, the ion exchange property of adjacent soils, and the distance to the nearest surface water bodies (1,500 to 8,000 feet) indicates that surface water and sediment outcrop of contaminates may be expected between 44 and 530 years (Poe et al., 1974). Remedial action objectives consist of medium-specific and operable unit specific goals for protecting human health and the environment. These objectives are specific and do not limit the range of alternatives that may be developed.A range of remedial technologies, which provides for treatment, containment, and removal requirements of contaminated media remaining at the Tank 16 groundwater operable unit, is identified and developed for each general response action.« less

  17. Preliminary remedial action objectives for the Tank 16 groundwater operable unit

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miles, W.C. Jr.

    1992-10-28

    Tank 16 is a High Level Radioactive Waste tank in the H-Area Tank Farm on the Savannah River Site that was placed into service in May 1959. A leak was detected in one of the construction weld joints while the tank was being filled. Before jet evacuation of the tank waste was completed, the leak overflowed the annulus pan and an estimated 16 to 700 gallons of waste escaped to the environment (soil and groundwater) over a six hour period contaminating approximately 1,600--70,000 cubic feet of soil with up to 5000 curies of activity (principally Cs{sup 137}). The Tank 16more » bottom is constructed below the groundwater table which resulted in almost immediate contamination of that medium. Low groundwater flow rates, the ion exchange property of adjacent soils, and the distance to the nearest surface water bodies (1,500 to 8,000 feet) indicates that surface water and sediment outcrop of contaminates may be expected between 44 and 530 years (Poe et al., 1974). Remedial action objectives consist of medium-specific and operable unit specific goals for protecting human health and the environment. These objectives are specific and do not limit the range of alternatives that may be developed.A range of remedial technologies, which provides for treatment, containment, and removal requirements of contaminated media remaining at the Tank 16 groundwater operable unit, is identified and developed for each general response action.« less

  18. 40 CFR 267.198 - What are the general operating requirements for my tank systems?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... FACILITIES OPERATING UNDER A STANDARDIZED PERMIT Tank Systems § 267.198 What are the general operating... 40 Protection of Environment 28 2012-07-01 2012-07-01 false What are the general operating requirements for my tank systems? 267.198 Section 267.198 Protection of Environment ENVIRONMENTAL PROTECTION...

  19. 40 CFR 267.198 - What are the general operating requirements for my tank systems?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... FACILITIES OPERATING UNDER A STANDARDIZED PERMIT Tank Systems § 267.198 What are the general operating... 40 Protection of Environment 27 2011-07-01 2011-07-01 false What are the general operating requirements for my tank systems? 267.198 Section 267.198 Protection of Environment ENVIRONMENTAL PROTECTION...

  20. 40 CFR 267.198 - What are the general operating requirements for my tank systems?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... FACILITIES OPERATING UNDER A STANDARDIZED PERMIT Tank Systems § 267.198 What are the general operating... 40 Protection of Environment 27 2014-07-01 2014-07-01 false What are the general operating requirements for my tank systems? 267.198 Section 267.198 Protection of Environment ENVIRONMENTAL PROTECTION...

  1. 40 CFR 267.198 - What are the general operating requirements for my tank systems?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... FACILITIES OPERATING UNDER A STANDARDIZED PERMIT Tank Systems § 267.198 What are the general operating... 40 Protection of Environment 28 2013-07-01 2013-07-01 false What are the general operating requirements for my tank systems? 267.198 Section 267.198 Protection of Environment ENVIRONMENTAL PROTECTION...

  2. 40 CFR 267.198 - What are the general operating requirements for my tank systems?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... FACILITIES OPERATING UNDER A STANDARDIZED PERMIT Tank Systems § 267.198 What are the general operating... 40 Protection of Environment 26 2010-07-01 2010-07-01 false What are the general operating requirements for my tank systems? 267.198 Section 267.198 Protection of Environment ENVIRONMENTAL PROTECTION...

  3. Building America Expert Meeting Report: Transitioning Traditional HVAC Contractors to Whole House Performance Contractors

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burdick, A.

    This report outlines findings resulting from a U.S. Department of Energy Building America expert meeting to determine how HVAC companies can transition from a traditional contractor status to a service provider for whole house energy upgrade contracting. IBACOS has embarked upon a research effort under the Building America Program to understand business impacts and change management strategies for HVAC companies. HVAC companies can implement these strategies in order to quickly transition from a 'traditional' heating and cooling contractor to a service provider for whole house energy upgrade contracting. Due to HVAC service contracts, which allow repeat interaction with homeowners, HVACmore » companies are ideally positioned in the marketplace to resolve homeowner comfort issues through whole house energy upgrades. There are essentially two primary ways to define the routes of transition for an HVAC contractor taking on whole house performance contracting: (1) Sub-contracting out the shell repair/upgrade work; and (2) Integrating the shell repair/upgrade work into their existing business. IBACOS held an Expert Meeting on the topic of Transitioning Traditional HVAC Contractors to Whole House Performance Contractors on March 29, 2011 in San Francisco, CA. The major objectives of the meeting were to: Review and validate the general business models for traditional HVAC companies and whole house energy upgrade companies Review preliminary findings on the differences between the structure of traditional HVAC Companies and whole house energy upgrade companies Seek industry input on how to structure information so it is relevant and useful for traditional HVAC contractors who are transitioning to becoming whole house energy upgrade contractors Seven industry experts identified by IBACOS participated in the session along with one representative from the National Renewable Energy Laboratory (NREL). The objective of the meeting was to validate the general operational

  4. Transient thermal analysis for radioactive liquid mixing operations in a large-scaled tank

    DOE PAGES

    Lee, S. Y.; Smith, III, F. G.

    2014-07-25

    A transient heat balance model was developed to assess the impact of a Submersible Mixer Pump (SMP) on radioactive liquid temperature during the process of waste mixing and removal for the high-level radioactive materials stored in Savannah River Site (SRS) tanks. The model results will be mainly used to determine the SMP design impacts on the waste tank temperature during operations and to develop a specification for a new SMP design to replace existing longshaft mixer pumps used during waste removal. The present model was benchmarked against the test data obtained by the tank measurement to examine the quantitative thermalmore » response of the tank and to establish the reference conditions of the operating variables under no SMP operation. The results showed that the model predictions agreed with the test data of the waste temperatures within about 10%.« less

  5. 32 CFR 310.12 - Government contractors.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 2 2014-07-01 2014-07-01 false Government contractors. 310.12 Section 310.12... PROGRAM DOD PRIVACY PROGRAM Systems of Records § 310.12 Government contractors. (a) Applicability to government contractors. (1) When a DoD Component contract requires the operation or maintenance of a system...

  6. 32 CFR 310.12 - Government contractors.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 2 2013-07-01 2013-07-01 false Government contractors. 310.12 Section 310.12... PROGRAM DOD PRIVACY PROGRAM Systems of Records § 310.12 Government contractors. (a) Applicability to government contractors. (1) When a DoD Component contract requires the operation or maintenance of a system...

  7. 32 CFR 310.12 - Government contractors.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 2 2011-07-01 2011-07-01 false Government contractors. 310.12 Section 310.12... PROGRAM DOD PRIVACY PROGRAM Systems of Records § 310.12 Government contractors. (a) Applicability to government contractors. (1) When a DoD Component contract requires the operation or maintenance of a system...

  8. 32 CFR 310.12 - Government contractors.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 2 2012-07-01 2012-07-01 false Government contractors. 310.12 Section 310.12... PROGRAM DOD PRIVACY PROGRAM Systems of Records § 310.12 Government contractors. (a) Applicability to government contractors. (1) When a DoD Component contract requires the operation or maintenance of a system...

  9. 32 CFR 310.12 - Government contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 2 2010-07-01 2010-07-01 false Government contractors. 310.12 Section 310.12... PROGRAM DOD PRIVACY PROGRAM Systems of Records § 310.12 Government contractors. (a) Applicability to government contractors. (1) When a DoD Component contract requires the operation or maintenance of a system...

  10. 28 CFR 513.36 - Government contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Government contractors. 513.36 Section... contractors. (a) No Bureau component may contract for the operation of a record system by or on behalf of the... component shall have the responsibility to ensure that the contractor complies with the contract...

  11. A model of electron collecting plasma contractors

    NASA Technical Reports Server (NTRS)

    Davis, V. A.; Katz, I.; Mandell, M. J.; Parks, D. E.

    1989-01-01

    A model of plasma contractors is being developed, which can be used to describe electron collection in a laboratory test tank and in the space environment. To validate the model development, laboratory experiments are conducted in which the source plasma is separated from the background plasma by a double layer. Model calculations show that an increase in ionization rate with potential produces a steep rise in collected current with increasing potential.

  12. 48 CFR 970.5244-1 - Contractor purchasing system.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor purchasing... for Management and Operating Contracts 970.5244-1 Contractor purchasing system. As prescribed in 970.4403 insert the following clause: Contractor Purchasing System (AUG 2009) (a) General. The Contractor...

  13. 48 CFR 970.5203-3 - Contractor's organization.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor's organization... for Management and Operating Contracts 970.5203-3 Contractor's organization. As prescribed in 970.0371-9, insert the following clause: Contractor's Organization (DEC 2000) (a) Organization chart. As...

  14. 48 CFR 923.102 - Applicability to contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contractors. 923.102 Section 923.102 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SOCIOECONOMIC... 923.102 Applicability to contractors. Many of the Department's major facilities are operated by contractors. Provisions regarding those contracts may be found at Part 970 of this chapter. At other locations...

  15. 18 CFR 3b.4 - Government contractors.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Government contractors. 3b.4 Section 3b.4 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION... PERSONAL INFORMATION General § 3b.4 Government contractors. Systems of records operated by a contractor...

  16. 18 CFR 3b.4 - Government contractors.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Government contractors. 3b.4 Section 3b.4 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION... PERSONAL INFORMATION General § 3b.4 Government contractors. Systems of records operated by a contractor...

  17. 48 CFR 970.5244-1 - Contractor purchasing system.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... for Management and Operating Contracts 970.5244-1 Contractor purchasing system. As prescribed in 970... management system. The Contractor's approved purchasing system and methods shall include the requirements set... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Contractor purchasing...

  18. Contractor and government - Teamwork and commitment

    NASA Technical Reports Server (NTRS)

    Griffin, G. D.

    1985-01-01

    Procedures being implemented at NASA to improve cooperation with contractors and increase productivity are reviewed from the NASA point of view. The goals of the U.S. space program for the coming 25 years are listed, and the importance of the commercial utilization of space in these plans is stressed. Consideration is given to the ongoing American Productivity Center White-Collar Productivity-Improvement Project, the implementation of the recommendations of the 1984 NASA/Contractor Conferences in present and future contracts, and the use of incentive contracts to create situations in which both NASA and the contractor benefit from increased productivity. Future plans call for increased industry responsibility in managing and operating the STS; steamlining of Shuttle operations; advanced design-to-cost procedures, increased commonality, better NASA-contractor communications, and more use of CAD/CAM and robotics for the Space Station; and accommodation of greatly expanded private investment and exploitation of space.

  19. Contractors are cautiously optimistic

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stremel, K.

    1984-10-01

    Anticipating stable crew counts and marginal increases in operator exploration budgets, geophysical contractors are cautiously optimistic about continued industry growth. Most companies are operating on lean profits, and more business consolidations are expected as the market gradually rebounds. Prospects for an upturn in geophysical operations by oil companies are discussed.

  20. Tank 241-AZ-102 Privatization Push Mode Core Sampling and Analysis Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    RASMUSSEN, J.H.

    1999-08-02

    This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for samples obtained from tank 241-AZ-102. The purpose of this sampling event is to obtain information about the characteristics of the contents of 241-AZ-102 required to satisfy the Data Quality Objectives For TWRS Privatization Phase I: Confirm Tank TIS An Appropriate Feed Source For High-Level Waste Feed Batch X(HLW DQO) (Nguyen 1999a), Data Quality Objectives For TWRS Privatization Phase 1: Confirm Tank TIS An Appropriate Feed Source For Low-Activity Waste Feed Batch X (LAW DQO) (Nguyen 1999b), Low Activity Waste andmore » High Level Waste Feed Data Quality Objectives (L&H DQO) (Patello et al. 1999) and Characterization Data Needs for Development, Design, and Operation of Retrieval Equipment Developed through the Data Quality Objective Process (Equipment DQO) (Bloom 1996). The Tank Characterization Technical Sampling Basis document (Brown et al. 1998) indicates that these issues, except the Equipment DQO apply to tank 241-AZ-102 for this sampling event. The Equipment DQO is applied for shear strength measurements of the solids segments only. Poppiti (1999) requires additional americium-241 analyses of the sludge segments. Brown et al. (1998) also identify safety screening, regulatory issues and provision of samples to the Privatization Contractor(s) as applicable issues for this tank. However, these issues will not be addressed via this sampling event. Reynolds et al. (1999) concluded that information from previous sampling events was sufficient to satisfy the safety screening requirements for tank 241 -AZ-102. Push mode core samples will be obtained from risers 15C and 24A to provide sufficient material for the chemical analyses and tests required to satisfy these data quality objectives. The 222-S Laboratory will extrude core samples, composite the liquids and solids, perform chemical

  1. 33 CFR 157.110 - Crude Oil Washing Operations and Equipment Manual for foreign tank vessels: Submission.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... MARINE ENVIRONMENT RELATING TO TANK VESSELS CARRYING OIL IN BULK Crude Oil Washing (COW) System on Tank...: Submission. If the owner or operator of a foreign tank vessel having a COW system under § 157.10(e), § 157...

  2. Engineering Task Plan for the Ultrasonic Inspection of Hanford Double Shell Tanks (DST) FY2000

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    JENSEN, C.E.

    2000-01-10

    This document facilitates the ultrasonic examination of Hanford double-shell tanks. Included are a plan for engineering activities (individual responsibilities), plan for performance demonstration testing, and a plan for field activities (tank inspection). Also included are a Statement of Work for contractor performance of the work and a protocol to be followed should tank flaws that exceed the acceptance criteria be discovered.

  3. 78 FR 21159 - Additional Requirements for Special Dipping and Coating Operations (Dip Tanks); Extension of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-09

    ...] Additional Requirements for Special Dipping and Coating Operations (Dip Tanks); Extension of the Office of Management and Budget's Approval of the Information Collection (Paperwork) Requirement AGENCY: Occupational... requirement specified in its Standard on Dipping and Coating Operations (Dip Tanks) (29 CFR 1910.126(g)(4...

  4. Evaluation of 241-AZ tank farm supporting phase 1 privatization waste feed delivery

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    CARLSON, A.B.

    1998-11-19

    This evaluation is one in a series of evaluations determining the process needs and assessing the adequacy of existing and planned equipment in meeting those needs at various double-shell tank farms in support of Phase 1 privatization. A number of tank-to-tank transfers and waste preparation activities are needed to process and feed waste to the private contractor in support of Phase 1 privatization. The scope of this evaluation is limited to process needs associated with 241-AZ tank farm during the Phase 1 privatization.

  5. Tank waste remediation system retrieval and disposal mission readiness-to-proceed responses to internal independent assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schaus, P.S.

    1998-01-06

    The US Department of Energy (DOE) is planning to make critical decisions during fiscal year (FY) 1998 regarding privatization contracts for the treatment of Hanford tank waste. Specifically, DOE, Richland Operations Office (RL), will make decisions related to proceeding with Phase 1 Privatization. In support of these decisions, the management and integration (M+I) contractor must be able to meet the requirements to support the Phase 1 privatization contractors. As part of the assessment of the Tank Waste Retrieval (TWR) Readiness-To-Proceed (RTP), an independent review of their process and products was required by the RL letter of August 8, 1997. Themore » Independent Review Team reviewed the adequacy of the planning that has been done by the M+I contractor to validate that, if the plans are carried out, there is reasonable assurance of success. Overall, the RTP Independent Review Team concluded that, if the planning by the M+I contractor team is carried out with adequate funding, there is reasonable assurance that the M+I contractor will be able to deliver waste to the privatization contractor for the duration of Phase 1. This conclusion was based on addressing the recommendations contained in the Independent Review Team`s Final Report and in the individual Criteria and Review Approach (CRA) forms completed during the assessment. The purpose of this report is to formally document the independent assessment and the RTP team responses to the Independent Review Team recommendations. It also provides closure logics for selected recommendations from a Lockheed Martin Hanford Corporation (LMHC) internal assessment of the Technical Basis Review (TBR) packages. This report contains the RTP recommendation closure process (Section 2.0); the closure tables (Section 3.0) which provide traceability between each review team recommendation and its corresponding Project Hanford Management Contract closure logic; and two attachments that formally document the Independent Review

  6. EXPERIMENTAL METHODS TO ESTIMATE ACCUMULATED SOLIDS IN NUCLEAR WASTE TANKS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Duignan, M.; Steeper, T.; Steimke, J.

    2012-12-10

    The Department of Energy has a large number of nuclear waste tanks. It is important to know if fissionable materials can concentrate when waste is transferred from staging tanks prior to feeding waste treatment plants. Specifically, there is a concern that large, dense particles, e.g., plutonium containing, could accumulate in poorly mixed regions of a blend tank heel for tanks that employ mixing jet pumps. At the request of the DOE Hanford Tank Operations Contractor, Washington River Protection Solutions, the Engineering Development Laboratory of the Savannah River National Laboratory performed a scouting study in a 1/22-scale model of a wastemore » tank to investigate this concern and to develop measurement techniques that could be applied in a more extensive study at a larger scale. Simulated waste tank solids and supernatant were charged to the test tank and rotating liquid jets were used to remove most of the solids. Then the volume and shape of the residual solids and the spatial concentration profiles for the surrogate for plutonium were measured. This paper discusses the overall test results, which indicated heavy solids only accumulate during the first few transfer cycles, along with the techniques and equipment designed and employed in the test. Those techniques include: Magnetic particle separator to remove stainless steel solids, the plutonium surrogate from a flowing stream; Magnetic wand used to manually remove stainless steel solids from samples and the tank heel; Photographs were used to determine the volume and shape of the solids mounds by developing a composite of topographical areas; Laser rangefinders to determine the volume and shape of the solids mounds; Core sampler to determine the stainless steel solids distribution within the solids mounds; Computer driven positioner that placed the laser rangefinders and the core sampler over solids mounds that accumulated on the bottom of a scaled staging tank in locations where jet velocities were

  7. 48 CFR 970.0407 - Contractor records retention.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor records retention. 970.0407 Section 970.0407 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Administrative Matters 970.0407 Contractor...

  8. Think Tanks

    NASA Technical Reports Server (NTRS)

    2001-01-01

    A new inspection robot from Solex Robotics Systems was designed to eliminate hazardous inspections of petroleum and chemical storage tanks. The submersible robot, named Maverick, is used to inspect the bottoms of tanks, keeping the tanks operational during inspection. Maverick is able to provide services that will make manual tank inspections obsolete. While the inspection is conducted, Maverick's remote human operators remain safe outside of the tank. The risk to human health and life is now virtually eliminated. The risk to the environment is also minimal because there is a reduced chance of spillage from emptying and cleaning the tanks, where previously, tons of pollutants were released through the process of draining and refilling.

  9. 4 CFR 83.19 - Government contractors.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 4 Accounts 1 2011-01-01 2011-01-01 false Government contractors. 83.19 Section 83.19 Accounts GOVERNMENT ACCOUNTABILITY OFFICE RECORDS PRIVACY PROCEDURES FOR PERSONNEL RECORDS § 83.19 Government contractors. When GAO provides by a contract for the operation by or on behalf of GAO of a system of personnel...

  10. 4 CFR 83.19 - Government contractors.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 4 Accounts 1 2013-01-01 2013-01-01 false Government contractors. 83.19 Section 83.19 Accounts GOVERNMENT ACCOUNTABILITY OFFICE RECORDS PRIVACY PROCEDURES FOR PERSONNEL RECORDS § 83.19 Government contractors. When GAO provides by a contract for the operation by or on behalf of GAO of a system of personnel...

  11. 4 CFR 83.19 - Government contractors.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 4 Accounts 1 2012-01-01 2012-01-01 false Government contractors. 83.19 Section 83.19 Accounts GOVERNMENT ACCOUNTABILITY OFFICE RECORDS PRIVACY PROCEDURES FOR PERSONNEL RECORDS § 83.19 Government contractors. When GAO provides by a contract for the operation by or on behalf of GAO of a system of personnel...

  12. 4 CFR 83.19 - Government contractors.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 4 Accounts 1 2014-01-01 2013-01-01 true Government contractors. 83.19 Section 83.19 Accounts GOVERNMENT ACCOUNTABILITY OFFICE RECORDS PRIVACY PROCEDURES FOR PERSONNEL RECORDS § 83.19 Government contractors. When GAO provides by a contract for the operation by or on behalf of GAO of a system of personnel...

  13. 75 FR 17162 - Dipping and Coating Operations (Dip Tanks) Standard; Extension of the Office of Management and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-05

    ...] Dipping and Coating Operations (Dip Tanks) Standard; Extension of the Office of Management and Budget's... Standard on Dipping and Coating Operations (Dip Tanks) (29 CFR 1910.126(g)(4)). DATES: Comments must be... of efforts in obtaining information (29 U.S.C. 657). The Standard on Dipping and Coating Operations...

  14. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT TO SAFELY AND EFFECTIVELY COMPLETE NUCLEAR CONSTRUCTION WORK

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LESO KF; HAMILTON HM; FARNER M

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipmentmore » and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel

  15. Experimental Methods to Estimate Accumulated Solids in Nuclear Waste Tanks - 13313

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Duignan, Mark R.; Steeper, Timothy J.; Steimke, John L.

    2013-07-01

    The Department of Energy has a large number of nuclear waste tanks. It is important to know if fissionable materials can concentrate when waste is transferred from staging tanks prior to feeding waste treatment plants. Specifically, there is a concern that large, dense particles, e.g., plutonium containing, could accumulate in poorly mixed regions of a blend tank heel for tanks that employ mixing jet pumps. At the request of the DOE Hanford Tank Operations Contractor, Washington River Protection Solutions, the Engineering Development Laboratory of the Savannah River National Laboratory performed a scouting study in a 1/22-scale model of a wastemore » tank to investigate this concern and to develop measurement techniques that could be applied in a more extensive study at a larger scale. Simulated waste tank solids and supernatant were charged to the test tank and rotating liquid jets were used to remove most of the solids. Then the volume and shape of the residual solids and the spatial concentration profiles for the surrogate for plutonium were measured. This paper discusses the overall test results, which indicated heavy solids only accumulate during the first few transfer cycles, along with the techniques and equipment designed and employed in the test. Those techniques include: - Magnetic particle separator to remove stainless steel solids, the plutonium surrogate from a flowing stream. - Magnetic wand used to manually remove stainless steel solids from samples and the tank heel. - Photographs were used to determine the volume and shape of the solids mounds by developing a composite of topographical areas. - Laser range finders to determine the volume and shape of the solids mounds. - Core sampler to determine the stainless steel solids distribution within the solids mounds. - Computer driven positioner that placed the laser range finders and the core sampler over solids mounds that accumulated on the bottom of a scaled staging tank in locations where jet

  16. Debarment and suspension. [of contractors

    NASA Technical Reports Server (NTRS)

    Whelan, Thomas J.

    1987-01-01

    The changing Government attitude toward contractor debarment and suspension is examined, with emphasis on the fact that the Government is more alert to fraud, waste, and abuse. Consideration is given to causes of debarment or suspension, procedures and due process hearings, settlement agreements, compliance programs, and recent related legislation. It is concluded that the change in the Government contracting environment in recent years should be sufficient incentive for contractors to monitor their operations more closely.

  17. Contractor evaluations in the contractor selection process.

    DOT National Transportation Integrated Search

    2014-04-01

    The current contractor evaluation system in use within the Kentucky Transportation Cabinet is based on the contractor evaluation system developed as part of SPR 212-00 "Quality Based Prequalification of Contractors." This system relies on average per...

  18. One System Integrated Project Team: Retrieval and Delivery of Hanford Tank Wastes for Vitrification in the Waste Treatment Plant - 13234

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harp, Benton J.; Kacich, Richard M.; Skwarek, Raymond J.

    The One System Integrated Project Team (IPT) was formed in late 2011 as a way for improving the efficiency of delivery and treatment of highly radioactive waste stored in underground tanks at the U.S. Department of Energy's (DOE's) 586-square-mile Hanford Site in southeastern Washington State. The purpose of the One System IPT is to improve coordination and integration between the Hanford's Waste Treatment Plant (WTP) contractor and the Tank Operations Contractor (TOC). The vision statement is: One System is a WTP and TOC safety-conscious team that, through integrated management and implementation of risk-informed decision and mission-based solutions, will enable themore » earliest start of safe and efficient treatment of Hanford's tank waste, to protect the Columbia River, environment and public. The IPT is a formal collaboration between Bechtel National, Inc. (BNI), which manages design and construction of the WTP for the U.S. Department of Energy's Office of River Protection (DOEORP), and Washington River Protection Solutions (WRPS), which manages the TOC for ORP. More than fifty-six (56) million gallons of highly radioactive liquid waste are stored in one hundred seventy-seven (177) aging, underground tanks. Most of Hanford's waste tanks - one hundred forty-nine (149) of them - are of an old single-shell tank (SST) design built between 1944 and 1964. More than sixty (60) of these tanks have leaked in the past, releasing an estimated one million gallons of waste into the soil and threatening the nearby Columbia River. There are another twenty-eight (28) new double-shelled tanks (DSTs), built from 1968 to 1986, that provide greater protection to the environment. In 1989, DOE, the U.S. Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) signed a landmark agreement that required Hanford to comply with federal and state environmental standards. It also paved the way for agreements that set deadlines for retrieving the

  19. One System Integrated Project Team: Retrieval And Delivery Of The Hanford Tank Wastes For Vitrification In The Waste Treatment Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harp, Benton J.; Kacich, Richard M.; Skwarek, Raymond J.

    The One System Integrated Project Team (IPT) was formed in late 2011 as a way for improving the efficiency of delivery and treatment of highly radioactive waste stored in underground tanks at the U.S. Department of Energy's (DOE's) 586-square-mile Hanford Site in southeastern Washington State. The purpose of the One System IPT is to improve coordination and integration between the Hanford's Waste Treatment Plant (WTP) contractor and the Tank Operations Contractor (TOC). The vision statement is: One System is a WTP and TOC safety conscious team that, through integrated management and implementation of risk-informed decision and mission-based solutions, will enablemore » the earliest start of safe and efficient treatment of Hanford's tank waste, to protect the Columbia River, environment and public. The IPT is a formal collaboration between Bechtel National, Inc. (BNI), which manages design and construction of the WTP for the U.S. Department of Energy's Office of River Protection (DOEORP), and Washington River Protection Solutions (WRPS), which manages the TOC for ORP. More than fifty-six (56) million gallons of highly radioactive liquid waste are stored in one hundred seventy-seven (177) aging, underground tanks. Most of Hanford's waste tanks - one hundred forty-nine (149) of them - are of an old single-shell tank (SST) design built between 1944 and 1964. More than sixty (60) of these tanks have leaked in the past, releasing an estimated one million gallons of waste into the soil and threatening the nearby Columbia River. There are another twenty-eight (28) new double-shelled tanks (DSTs), built from 1968 to 1986, that provide greater protection to the environment. In 1989, DOE, the U.S. Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) signed a landmark agreement that required Hanford to comply with federal and state environmental standards. It also paved the way for agreements that set deadlines for retrieving the

  20. Optimal Operation of a Thermal Energy Storage Tank Using Linear Optimization

    NASA Astrophysics Data System (ADS)

    Civit Sabate, Carles

    In this thesis, an optimization procedure for minimizing the operating costs of a Thermal Energy Storage (TES) tank is presented. The facility in which the optimization is based is the combined cooling, heating, and power (CCHP) plant at the University of California, Irvine. TES tanks provide the ability of decoupling the demand of chilled water from its generation, over the course of a day, from the refrigeration and air-conditioning plants. They can be used to perform demand-side management, and optimization techniques can help to approach their optimal use. The proposed optimization approach provides a fast and reliable methodology of finding the optimal use of the TES tank to reduce energy costs and provides a tool for future implementation of optimal control laws on the system. Advantages of the proposed methodology are studied using simulation with historical data.

  1. Results Of Routine Strip Effluent Hold Tank, Decontaminated Salt Solution Hold Tank, And Caustic Wash Tank Samples From Modular Caustic-Side Solvent Extraction Unit During Macrobatch 4 Operations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peters, T. B.; Fink, S. D.

    Strip Effluent Hold Tank (SEHT), Decontaminated Salt Solution Hold Tank (DSSHT), and Caustic Wash Tank (CWT) samples from several of the ?microbatches? of Integrated Salt Disposition Project (ISDP) Salt Batch (?Macrobatch?) 4 have been analyzed for {sup 238}Pu, {sup 90}Sr, {sup 137}Cs, and by inductively-coupled plasma emission spectroscopy (ICPES). Furthermore, samples from the CWT have been analyzed by a variety of methods to investigate a decline in the decontamination factor (DF) of the cesium observed at MCU. The results indicate good decontamination performance within process design expectations. While the data set is sparse, the results of this set and themore » previous set of results for Macrobatch 3 samples indicate generally consistent operations. There is no indication of a disruption in plutonium and strontium removal. The average cesium DF and concentration factor (CF) for samples obtained from Macrobatch 4 are slightly lower than for Macrobatch 3, but still well within operating parameters. The DSSHT samples show continued presence of titanium, likely from leaching of the monosodium titanate in Actinide Removal Process (ARP).« less

  2. Efforts to Prevent Sexual Assault/Harassment Involving DOD Contractors During Contingency Operations

    DTIC Science & Technology

    2010-04-16

    36 FAR Subpart 9.406-5, “ Debarment ,” October 1995, provides the Government with the option of imposing debarment or suspension as... sanctions against a contractor to protect the Government’s interest when the agent of the contractor, such as an employee, engages in fraudulent, criminal

  3. Alternative Fuels Data Center: Installing B20 Equipment

    Science.gov Websites

    operations to share the fueling site with you. Secure Permits, Adhere to State Requirements The contractor is storage tanks. The contractor will register storage tanks with the state environmental agency, which must the contractor and client to ensure the completed project meets expectations. Maps & Data U.S

  4. An expert system to manage the operation of the Space Shuttle's fuel cell cryogenic reactant tanks

    NASA Technical Reports Server (NTRS)

    Murphey, Amy Y.

    1990-01-01

    This paper describes a rule-based expert system to manage the operation of the Space Shuttle's cryogenic fuel system. Rules are based on standard fuel tank operating procedures described in the EECOM Console Handbook. The problem of configuring the operation of the Space Shuttle's fuel tanks is well-bounded and well defined. Moreover, the solution of this problem can be encoded in a knowledge-based system. Therefore, a rule-based expert system is the appropriate paradigm. Furthermore, the expert system could be used in coordination with power system simulation software to design operating procedures for specific missions.

  5. 33 CFR Appendix D to Part 157 - Example of a Procedure for Dedicated Clean Ballast Tanks Operations

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Dedicated Clean Ballast Tanks Operations D Appendix D to Part 157 Navigation and Navigable Waters COAST... ENVIRONMENT RELATING TO TANK VESSELS CARRYING OIL IN BULK Pt. 157, App. D Appendix D to Part 157—Example of a.... (3) Ensure that all valves in the dedicated clean ballast tanks are closed. (d) Before arrival at the...

  6. Results Of Routine Strip Effluent Hold Tank, Decontaminated Salt Solution Hold Tank, Caustic Wash Tank And Caustic Storage Tank Samples From Modular Caustic-Side Solvent Extraction Unit During Macrobatch 6 Operations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peters, T. B.

    Strip Effluent Hold Tank (SEHT), Decontaminated Salt Solution Hold Tank (DSSHT), Caustic Wash Tank (CWT) and Caustic Storage Tank (CST) samples from several of the ''microbatches'' of Integrated Salt Disposition Project (ISDP) Salt Batch (''Macrobatch'') 6 have been analyzed for {sup 238}Pu, {sup 90}Sr, {sup 137}Cs, and by Inductively Coupled Plasma Emission Spectroscopy (ICPES). The results from the current microbatch samples are similar to those from comparable samples in Macrobatch 5. From a bulk chemical point of view, the ICPES results do not vary considerably between this and the previous macrobatch. The titanium results in the DSSHT samples continue tomore » indicate the presence of Ti, when the feed material does not have detectable levels. This most likely indicates that leaching of Ti from MST in ARP continues to occur. Both the CST and CWT samples indicate that the target Free OH value of 0.03 has been surpassed. While at this time there is no indication that this has caused an operational problem, the CST should be adjusted into specification. The {sup 137}Cs results from the SRNL as well as F/H lab data indicate a potential decline in cesium decontamination factor. Further samples will be carefully monitored to investigate this.« less

  7. 76 FR 27300 - Hazardous Materials: Cargo Tank Motor Vehicle Loading and Unloading Operations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-11

    ... Motor Vehicle Loading and Unloading Operations AGENCY: Pipeline and Hazardous Materials Safety... cargo tank motor vehicle proposals in this notice, we are providing affected entities as well as the...

  8. ETRCF, TRA654, INTERIOR. REACTOR OPERATED IN WATERFILLED TANK. CAMERA LOOKS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ETR-CF, TRA-654, INTERIOR. REACTOR OPERATED IN WATER-FILLED TANK. CAMERA LOOKS DOWN FROM ABOVE UPON LATER (NON-NUCLEAR) EXPERIMENTAL GEAR. INL NEGATIVE NO. HD24-1-1. Mike Crane, Photographer, ca. 2003 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID

  9. 76 FR 52133 - Defense Federal Acquisition Regulation Supplement; Contractors Performing Private Security...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-19

    ... 0750-AH28 Defense Federal Acquisition Regulation Supplement; Contractors Performing Private Security..., entitled ``Contractors Performing Private Security Functions in Areas of Combat Operations or Other... of DoD and other Governmental private security contractors. A clause to cover the interagency...

  10. 23 CFR 646.105 - Contractor's public liability and property damage insurance.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... suffered by persons other than their own employees as a result of their operations in connection with... respecting their operations in performing work covered by their contract. (b) Where a contractor sublets a part of the work on any project to a subcontractor, the contractor shall be required to secure...

  11. 23 CFR 646.105 - Contractor's public liability and property damage insurance.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... suffered by persons other than their own employees as a result of their operations in connection with... respecting their operations in performing work covered by their contract. (b) Where a contractor sublets a part of the work on any project to a subcontractor, the contractor shall be required to secure...

  12. Survey of large circular and octagonal tanks operated at Norwegian commercial smolt and post-smolt sites

    USDA-ARS?s Scientific Manuscript database

    A survey was conducted to determine the geometry, operating parameters, and other key features of large circular or octagonal culture tanks used to produce Atlantic salmon smolt and post-smolt at six major Norwegian Atlantic salmon production companies. A total of 55 large tanks were reported at sev...

  13. 77 FR 52107 - Air Traffic Data in the Possession of Government Contractors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-28

    ... Government Contractors AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice. SUMMARY: The... possession of government contractors providing operational services to the FAA. This notice specifies how and... contractors. SUPPLEMENTARY INFORMATION: A. Background On August 3, 2012, the Pilot's Bill of Rights, Public...

  14. Overview of Hanford Single Shell Tank (SST) Structural Integrity

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rast, Richard S.; Washenfelder, Dennis J.; Johnson, Jeremy M.

    2013-11-14

    To improve the understanding of the single-shell tanks (SSTs) integrity, Washington River Protection Solutions, LLC (WRPS), the USDOE Hanford Site tank contractor, developed an enhanced Single-Shell Tank Integrity Project (SSTIP) in 2009. An expert panel on SST integrity, consisting of various subject matters experts in industry and academia, was created to provide recommendations supporting the development of the project. This panel developed 33 recommendations in four main areas of interest: structural integrity, liner degradation, leak integrity and prevention, and mitigation of contamination migration, Seventeen of these recommendations were used to develop the basis for the M-45-10-1 Change Package for themore » Hanford Federal Agreement and Compliance Order, which is also known as the Tri-Party Agreement. The structural integrity of the tanks is a key element in completing the cleanup mission at the Hanford Site. There are eight primary recommendations related to the structural integrity of Hanford Single-Shell Tanks. Six recommendations are being implemented through current and planned activities. The structural integrity of the Hanford is being evaluated through analysis, monitoring, inspection, materials testing, and construction document review. Structural evaluation in the form of analysis is performed using modern finite element models generated in ANSYS. The analyses consider in-situ, thermal, operating loads and natural phenomena such as earthquakes. Structural analysis of 108 of 149 Hanford Single-Shell Tanks has concluded that the tanks are structurally sound and meet current industry standards. Analysis of the remaining Hanford Single-Shell Tanks is scheduled for FY2014. Hanford Single-Shell Tanks are monitored through a dome deflection program. The program looks for deflections of the tank dome greater than 1/4 inch. No such deflections have been recorded. The tanks are also subjected to visual inspection. Digital cameras record the interior

  15. Contractor Logistics Support in the U.S. Air Force

    DTIC Science & Technology

    2009-01-01

    limits), or it can engage in a mix of the two approaches.2 This monograph addresses CLS, which is defined as contractor sustainment of a weapon system...organic facilities; it can pay contractors to do the work (subject to some congressional limits); or it can apply a mix of the two approaches.2 Organic...levels are largely stable and represent a mix of services, including contractor operated facilities and instal- Figure 3.1 Air Force CSS for Weapon

  16. 49 CFR 199.115 - Contractor employees.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY DRUG AND ALCOHOL TESTING Drug Testing... contractor, an operator may provide by contract that the drug testing, education, and training required by...

  17. 49 CFR 199.115 - Contractor employees.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY DRUG AND ALCOHOL TESTING Drug Testing... contractor, an operator may provide by contract that the drug testing, education, and training required by...

  18. 49 CFR 199.115 - Contractor employees.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY DRUG AND ALCOHOL TESTING Drug Testing... contractor, an operator may provide by contract that the drug testing, education, and training required by...

  19. 49 CFR 199.115 - Contractor employees.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY DRUG AND ALCOHOL TESTING Drug Testing... contractor, an operator may provide by contract that the drug testing, education, and training required by...

  20. Ground-based plasma contractor characterization

    NASA Technical Reports Server (NTRS)

    Patterson, Michael J.; Aadland, Randall S.

    1987-01-01

    Presented are recent NASA Lewis Research Center (LeRC) plasma contractor experimental results, as well as a description of the plasma contractor test facility. The operation of a 24 cm diameter plasma source with hollow cathode was investigated in the lighted-mode regime of electron current collection from 0.1 to 7.0 A. These results are compared to those obtained with a 12 cm plasma source. Full two-dimensional plasma potential profiles were constructed from emissive probe traces of the contractor plume. The experimentally measured dimensions of the plume sheaths were then compared to those theoretically predicted using a model of a spherical double sheath. Results are consistent for currents up to approximately 1.0 A. For currents above 1.0 A, substantial deviations from theory occur. These deviations are due to sheath asphericity, and possibly volume ionization in the double-sheath region.

  1. [Effects of tank operation on renal function of crews].

    PubMed

    Ma, Qiang; Wang, Hong-Fei; Xing, Chang-Jiang; Ma, Hua-Chao; Gong, Mei-Liang; Sun, Lei; Liang, Hong-Ling

    2014-09-01

    To explore the effects of harmful factors in tank cabins on renal function of tank crews. One hundred and fifty two tank crews as the observation group and 37 soldiers without tank environment exposure as control group were selected in the study. α1-microglobulin(α1-MG), β2-microglobulin(β2-MG), IgG, N-acetyl-β-glucosidase (NAG) and urinary albumin excretion rate (UAER) in morning and 24 h urine were measured. Compared to the control group, the levels of α1-MG, β2-MG, NAG, UAER in observation group were increased significantly (P < 0.05). β2-MG, NAG, UAER of Soldiers with more than 50 motorized hours in observation group were significantly higher than those of control group (P < 0.05). β2-MG, NAG and UAER of soldiers divorced from tank occupation more than 3 years decreased to the normal levels. β2-MG of soldiers divorced from tank occupation more than 10 years was significantly higher than that of 6-10 years group. Tank occupational exposure influences the renal function of tank crews but not to a degree of clinical kidney disease. The renal function of crews divorced from tank occupation may recover but dysfunction of renal tubular reabsorption still exists.

  2. Project W-211 Initial Tank Retrieval Systems (ITRS) Description of Operations for 241-AZ-102

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BRIGGS, S.R.

    2000-02-25

    The primary purpose of the Initial Tank Retrieval Systems (ITRS) is to provide systems for retrieval of radioactive wastes stored in underground double-shell tanks (DSTs) for transfer to alternate storage, evaporation, pretreatment or treatment, while concurrently reducing risks associated with safety watch list and other DSTs. This Description of Operation (DOO) defines the control philosophy for the waste retrieval system for Tank 241-AZ-102 (AZ-102). This DOO provides a basis for the detailed design of the Project W-211 Retrieval Control System (RCS) for AZ-102 and also establishes test criteria for the RCS.

  3. 77 FR 35883 - Defense Federal Acquisition Regulation Supplement; Contractors Performing Private Security...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-15

    ... 0750-AH28 Defense Federal Acquisition Regulation Supplement; Contractors Performing Private Security... Contractors (DoDI 3020.50) was revised on August 1, 2011, and the final rule to implement section 862 of the NDAA for FY 2008, as amended, 32 CFR part 159, Private Security Contractors Operating in Contingency...

  4. Risk Assessment for Titanium Pressure Vessels Operating Inside the ARES I's Liquid Hydrogen Tank Environment

    NASA Technical Reports Server (NTRS)

    Lee, Jonathan A.

    2008-01-01

    Titanium alloy (Ti-6-4) is currently being proposed for the manufacturing of pressure vessels (PV) for storage of compressed helium gas, which are mounted inside the ARES I's liquid hydrogen (LH2) tank. At cryogenic temperature, titanium alloys usually have the highest strength-to-weight ratio property and have been considered as the metallic materials of choice for lightweight PV operating in LH2 environment. Titanium PV s are also considered as heritage hardware because they have been used by NASA for the Saturn IV-B rocket s LH2 tank in the mid 1960 s. However, hydrogen embrittlement is possible if Ti-6-4 alloy is exposed to gaseous hydrogen at certain pressure and temperature during the LH2 tank filling and draining operations on the launch pad, and during the J2X engine burn period for the ARES I s upper stage. Additionally, the fracture toughness and ductility properties of Ti-6-4 are significantly decreased at cryogenic temperature. These factors do not necessary preclude the use of titanium PV in hydrogen or at cryogenic applications; however, their synergistic effects and the material damage tolerance must be accounted for in the mission life assessment for PV s, which are considered as fracture critical hardware. In this paper, an overview of the risk assessment for Ti-6-4 alloy, strategy to control hydrogen embrittlement and brief metallic material trade study for PV operating in LH2 tank will be presented.

  5. Injury Rates on New and Old Technology Oil and Gas Rigs Operated by the Largest United States Onshore Drilling Contractor

    PubMed Central

    Blackley, David J.; Retzer, Kyla D.; Hubler, Warren G.; Hill, Ryan D.; Laney, A. Scott

    2015-01-01

    Background Occupational fatality rates among oil and gas extraction industry and specifically among drilling contractor workers are high compared to the U.S. all-industry average. There is scant literature focused on non-fatal injuries among drilling contractors, some of which have introduced engineering controls to improve rig efficiency and reduce injury risk. Methods We compared injury rates on new and old technology rigs operated by the largest U.S. drilling contractor during 2003–2012, stratifying by job type and grouping outcomes by injury severity and body part affected. Results Six hundred seventy-one injuries were recorded over 77.4 million person-hours. The rate on new rigs was 66% of that on old rigs. Roughnecks had lower injury rates on new rigs, largely through reduced limb injury rates. New rigs had lower rates in each non-fatal injury severity category. Conclusions For this company, new technology rigs appear to provide a safer environment for roughnecks. Future studies could include data from additional companies. PMID:25164118

  6. Injury rates on new and old technology oil and gas rigs operated by the largest United States onshore drilling contractor.

    PubMed

    Blackley, David J; Retzer, Kyla D; Hubler, Warren G; Hill, Ryan D; Laney, A Scott

    2014-10-01

    Occupational fatality rates among oil and gas extraction industry and specifically among drilling contractor workers are high compared to the U.S. all-industry average. There is scant literature focused on non-fatal injuries among drilling contractors, some of which have introduced engineering controls to improve rig efficiency and reduce injury risk. We compared injury rates on new and old technology rigs operated by the largest U.S. drilling contractor during 2003-2012, stratifying by job type and grouping outcomes by injury severity and body part affected. Six hundred seventy-one injuries were recorded over 77.4 million person-hours. The rate on new rigs was 66% of that on old rigs. Roughnecks had lower injury rates on new rigs, largely through reduced limb injury rates. New rigs had lower rates in each non-fatal injury severity category. For this company, new technology rigs appear to provide a safer environment for roughnecks. Future studies could include data from additional companies. © 2014 Wiley Periodicals, Inc.

  7. Report on audit of Department of Energy`s contractor salary increase fund

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-04-04

    The Department of Energy (Department) uses contractors to operate its facilities and compensates contractor employees based on their skills, complexity of jobs, and work performance. Thirty-one of the Department`s major contractors reported a total payroll of $4.3 billion and $4.4 billion during 1994 and 1995, respectively. The 31 contractors also reported awarding salary increases of $18 million for 1994 and $200 million for 1995. The purpose of the audit was to review the process used to determine and approve the amount of salary increases for contractor employees. The specific audit objective was to determine whether salary increases received by contractormore » employees were in accordance with Departmental policies and procedures. The Department of Energy Acquisition Regulation (DEAR) requires that contractor salary actions be within specific limitations, supportable, and approved prior to incurrence of costs. In addition, the Secretary of Energy imposed a 1 year salary freeze on the merit portion of management and operating contractor employee salaries for each contractor`s Fiscal Year 1994 compensation year. However, a fund for promotions and adjustments was approved but limited to 0.5 percent of payroll for the year. A review of eight major contractors showed that six complied with the Department`s policies on salary increases. The other two gave salary increases that were not always in accordance with Departmental policies. This resulted in both contractors not fully complying with the pay freeze in 1994 and exceeding their salary increase fund budgets in 1995. If these two contractors had implemented Department and contract requirements and contracting officers had properly performed their contract administrative responsibilities concerning salary increase funds, both contractors would have frozen salary increases and would not have exceeded their annual budgets.« less

  8. Powder River lures contractors

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stremel, K.

    1984-10-01

    Drilling successes are stimulating a high level of geophysical activity in the Powder River Basin. Focused in areas of concentrated exploration, a majority of speculative surveys are specifically designed to delineate target formations. Several contractors credit available data with an increased amount of current and proposed exploration. Geophysical surveying operations in the northern Rockies are discussed.

  9. POTENTIAL IMPACT OF BLENDING RESIDUAL SOLIDS FROM TANKS 18/19 MOUNDS WITH TANK 7 OPERATIONS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eibling, R; Erich Hansen, E; Bradley Pickenheim, B

    2007-03-29

    High level waste tanks 18F and 19F have residual mounds of waste which may require removal before the tanks can be closed. Conventional slurry pump technology, previously used for waste removal and tank cleaning, has been incapable of removing theses mounds from tanks 18F and 19F. A mechanical cleaning method has been identified that is potentially capable of removing and transferring the mound material to tank 7F for incorporation in a sludge batch for eventual disposal in high level waste glass by the Defense Waste Processing Facility. The Savannah River National Laboratory has been requested to evaluate whether the materialmore » transferred from tanks 18F/19F by the mechanical cleaning technology can later be suspended in Tank 7F by conventional slurry pumps after mixing with high level waste sludge. The proposed mechanical cleaning process for removing the waste mounds from tanks 18 and 19 may utilize a high pressure water jet-eductor that creates a vacuum to mobilize solids. The high pressure jet is also used to transport the suspended solids. The jet-eductor system will be mounted on a mechanical crawler for movement around the bottom of tanks 18 and 19. Based on physical chemical property testing of the jet-eductor system processed IE-95 zeolite and size-reduced IE-95 zeolite, the following conclusions were made: (1) The jet-eductor system processed zeolite has a mean and median particle size (volume basis) of 115.4 and 43.3 microns in water. Preferential settling of these large particles is likely. (2) The jet-eductor system processed zeolite rapidly generates settled solid yield stresses in excess of 11,000 Pascals in caustic supernates and will not be easily retrieved from Tank 7 with the existing slurry pump technology. (3) Settled size-reduced IE-95 zeolite (less than 38 microns) in caustic supernate does not generate yield stresses in excess of 600 Pascals in less than 30 days. (4) Preferential settling of size-reduced zeolite is a function of the

  10. Department of Defense Contractor and Troop Levels in Iraq and Afghanistan: 2007-2016

    DTIC Science & Technology

    2016-08-15

    Department of Defense Contractor and Troop Levels in Iraq and Afghanistan: 2007-2016 Heidi M. Peters, Coordinator Information Research......1 The Role of Contractors in Military Operations .............................................................................. 1

  11. Project W-211, initial tank retrieval systems, description of operations for 241-AP-102 and 241-AP-104

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    RIECK, C.A.

    1999-02-25

    The primary purpose of the Initial Tank Retrieval Systems (ITRS) is to provide systems for retrieval of radioactive wastes stored in underground double-shell tanks (DSTS) for transfer to alternate storage, evaporation, pretreatment or treatment, while concurrently reducing risks associated with safety watch list and other DSTs. This Description of Operations (DOO) defines the control philosophy for the waste retrieval system for tanks 241-AP-102 (AP-102) and 241-AP-104 (AP-104). This DOO will provide a basis for the detailed design of the Retrieval Control System (RCS) for AP-102 and AP-104 and establishes test criteria for the RCS. The test criteria will be usedmore » during qualification testing and acceptance testing to verify operability.« less

  12. Progress of the Enhanced Hanford Single Shell Tank (SST) Integrity Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Venetz, Theodore J.; Washenfelder, Dennis J.; Boomer, Kayle D.

    2015-01-07

    To improve the understanding of the single-shell tanks (SSTs) integrity, Washington River Protection Solutions, LLC (WRPS), the USDOE Hanford Site tank contractor, developed an enhanced Single-Shell Tank Integrity Project (SSTIP) in 2009. An expert panel on SST integrity, consisting of various subject matters experts in industry and academia, was created to provide recommendations supporting the development of the project. This panel developed 33 recommendations in four main areas of interest: structural integrity, liner degradation, leak integrity and prevention, and mitigation of contamination migration. In late 2010, seventeen of these recommendations were used to develop the basis for the M-45-10-1 Changemore » Package for the Hanford Federal Agreement and Compliance Order, which is also known as the Tri-Party Agreement.« less

  13. 46 CFR 35.01-50 - Special operating requirements for tank barges carrying certain dangerous bulk cargoes-B/ALL.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... certain dangerous bulk cargoes-B/ALL. 35.01-50 Section 35.01-50 Shipping COAST GUARD, DEPARTMENT OF... Special operating requirements for tank barges carrying certain dangerous bulk cargoes—B/ALL. (a) The... closed and secured at all times. (f) During the time the cargo tanks contain dangerous cargoes described...

  14. 46 CFR 35.01-50 - Special operating requirements for tank barges carrying certain dangerous bulk cargoes-B/ALL.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... certain dangerous bulk cargoes-B/ALL. 35.01-50 Section 35.01-50 Shipping COAST GUARD, DEPARTMENT OF... Special operating requirements for tank barges carrying certain dangerous bulk cargoes—B/ALL. (a) The... closed and secured at all times. (f) During the time the cargo tanks contain dangerous cargoes described...

  15. 46 CFR 35.01-50 - Special operating requirements for tank barges carrying certain dangerous bulk cargoes-B/ALL.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... certain dangerous bulk cargoes-B/ALL. 35.01-50 Section 35.01-50 Shipping COAST GUARD, DEPARTMENT OF... Special operating requirements for tank barges carrying certain dangerous bulk cargoes—B/ALL. (a) The... closed and secured at all times. (f) During the time the cargo tanks contain dangerous cargoes described...

  16. Questionable payments for work of a contractor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1981-09-23

    Examination of three support contracts for international R and D disclosed fundamental weaknesses in DOE controls over the (1) receipt and acceptance of goods and services, (2) authorization and payments for work, and (3) analyses of price proposals submitted by the contractor. As a result of these weaknesses, there was no clear and convincing record of what DOE got for most of the $2.5 million it spent on these contracts. Neither was there a downward adjustment in the amounts paid by DOE under two of the contracts although such an adjustment was required by the contracts. Much of the workmore » done by the contractor was not properly authorized. Finally, analyses by the San Francisco Operations Office of certain of the price proposals submitted by the contractor did not ensure that DOE obtained a fair and reasonable price. Recommendations addressed these issues to the Procurement Office, the Controller, the Assistant Secretaries for Conservation and Renewable Energy and Fossil Energy, and the Manager, San Francisco Operations Office who indicated general agreement with the findings and a willingness to immediately pursue the remedial measure that were recommended. Their comments are appended.« less

  17. Ensuring Operational Access: Leveraging Engineering Contractors in the Pacific

    DTIC Science & Technology

    2015-05-21

    could leverage manpower already in theater and did not compete for limited military lift to deploy into theater.48 The second circumstance involved...Report highlighted that expeditionary contractors filled critical manpower gaps when political decisions limited the amount of military forces in a...direct the US Navy to redeploy fleet units to the Atlantic. This produced a shipping shortage in the Pacific and slowed work between May and August

  18. Hired Guns: Views about Armed Contractors in Operation Iraqi Freedom

    DTIC Science & Technology

    2010-01-01

    Survey Instrument Development , Sampling Procedures, and Other Data Sources . . . . . . . . . 4 Roadmap of the Monograph...Defense and State, and the U.S. Agency for International Development (USAID). However, jour- nalists, reconstruction contractors, nongovernmental...Agency for International Development (USAID). • Published literature. Our sources included government reports, memos, news- paper accounts, and

  19. Results for the DWPF Slurry Mix Evaporator Condensate Tank, Off Gas Condensate Tank, And Recycle Collection Tank Samples

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    TERRI, FELLINGER

    2004-12-21

    The Defense Waste Processing Facility, DWPF, currently generates approximately 1.4 million gallons of recycle water per year during Sludge-Only operations. DWPF has minimized condensate generation to 1.4 million gallons by not operating the Steam Atomized Scrubbers, SASs, for the melter off gas system. By not operating the SASs, DWPF has reduced the total volume by approximately 800,000 gallons of condensate per year. Currently, the recycle stream is sent to back to the Tank Farm and processed through the 2H Evaporator system. To alleviate the load on the 2H Evaporator system, an acid evaporator design is being considered as an alternatemore » processing and/or concentration method for the DWPF recycle stream. In order to support this alternate processing option, the DWPF has requested that the chemical and radionuclide compositions of the Off Gas Condensate Tank, OGCT, Slurry Mix Evaporator Condensate Tank, SMECT, Recycle Collection Tank, RCT, and the Decontamination Waste Treatment Tank, DWTT, be determined as a part of the process development work for the acid evaporator design. Samples have been retrieved from the OGCT, RCT, and SMECT and have been sent to the Savannah River National Laboratory, SRNL for this characterization. The DWTT samples have been recently shipped to SRNL. The results for the DWTT samples will be issued at later date.« less

  20. OVERVIEW OF HANFORD SINGLE SHELL TANK (SST) STRUCTURAL INTEGRITY - 12123

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    RAST RS; RINKER MW; WASHENFELDER DJ

    2012-01-25

    To improve the understanding of the single-shell tanks (SSTs) integrity, Washington River Protection Solutions, LLC (WRPS), the USDOE Hanford Site tank contractor, developed an enhanced Single-Shell Tank Integrity Project in 2009. An expert panel on SST integrity, consisting of various subject matters experts in industry and academia, was created to provide recommendations supporting the development of the project. This panel developed 33 recommendations in four main areas of interest: structural integrity, liner degradation, leak integrity and prevention, and mitigation of contamination migration. Seventeen of these recommendations were used to develop the basis for the M-45-10-1 Change Package for the Hanfordmore » Federal Agreement and Compliance Order, which is also known as the Tri-Party Agreement. The structural integrity of the tanks is a key element in completing the cleanup mission at the Hanford Site. There are eight primary recommendations related to the structural integrity of Hanford SSTs. Six recommendations are being implemented through current and planned activities. The structural integrity of the Hanford SSTs is being evaluated through analysis, monitoring, inspection, materials testing, and construction document review. Structural evaluation in the form of analysis is performed using modern finite element models generated in ANSYS{reg_sign} The analyses consider in-situ, thermal, operating loads and natural phenomena such as earthquakes. Structural analysis of 108 of 149 Hanford SSTs has concluded that the tanks are structurally sound and meet current industry standards. Analyses of the remaining Hanford SSTs are scheduled for FY2013. Hanford SSTs are monitored through a dome deflection program. The program looks for deflections of the tank dome greater than 1/4 inch. No such deflections have been recorded. The tanks are also subjected to visual inspection. Digital cameras record the interior surface of the concrete tank domes, looking for

  1. 33 CFR 157.147 - Similar tank design: Inspections on foreign tank vessels.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... tanks similar in dimensions and internal structure, the owner or operator may submit a written request... tanks similar in dimensions and internal structure is inspected under § 157.140(a)(1), if the Commandant...

  2. 33 CFR 157.147 - Similar tank design: Inspections on foreign tank vessels.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... tanks similar in dimensions and internal structure, the owner or operator may submit a written request... tanks similar in dimensions and internal structure is inspected under § 157.140(a)(1), if the Commandant...

  3. 33 CFR 157.147 - Similar tank design: Inspections on foreign tank vessels.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... tanks similar in dimensions and internal structure, the owner or operator may submit a written request... tanks similar in dimensions and internal structure is inspected under § 157.140(a)(1), if the Commandant...

  4. Operational Evaluation Of Vectomax® WSP (Bacillus thuringiensis Subsp. israelensis+Bacillus sphaericus) Against Larval Culex pipiens in Septic Tanks (1).

    PubMed

    Cetin, Huseyin; Oz, Emre; Yanikoglu, Atila; Cilek, James E

    2015-06-01

    The residual effectiveness of VectoMax® WSP (a water-soluble pouch formulation containing a combination of Bacillus thuringiensis subsp. israelensis strain AM65-52 and B. sphaericus strain ABTS 1743) when applied to septic tanks against 3rd- and 4th-stage larvae of Culex pipiens L. was evaluated in this study. This formulation was evaluated at operational application rates of 1 pouch (10 g) and 2 pouches (20 g) per septic tank. Both application rates resulted in >96% control of larvae for 24 days. Operationally, VectoMax WSP has proven to be a useful tool for the nonchemical control of Culex species in septic tank environments.

  5. Improvement of force health protection through preventive medicine oversight of contractor support.

    PubMed

    Mower, Scott A

    2009-01-01

    Unprecedented numbers of contractors are used throughout the Iraq theater of operations to alleviate military manpower shortages. At virtually every major forward operating base, US-based contractors perform the preponderance of essential life support services. At more remote sites, local national contractors are increasingly relied upon to maintain chemical latrines, remove trash, deliver bulk water, and execute other janitorial functions. Vigorous oversight of contractor performance is essential to ensure services are delivered according to specified standards. Poor oversight can increase the risk of criminal activities, permit substandard performance, elevate disease and nonbattle injury rates, degrade morale, and diminish Soldier readiness. As the principal force health protection proponents in the Department of Defense, preventive medicine units must be tightly integrated into the oversight processes. This article defines the force health protection implications associated with service contracts and provide recommendations for strengthening preventive medicine's oversight role.

  6. Evaluation of current operating standards for chlorine dioxide in disinfection of dump tank and flume for fresh tomatoes.

    PubMed

    Tomás-Callejas, Alejandro; López-Velasco, Gabriela; Valadez, Angela M; Sbodio, Adrian; Artés-Hernández, Francisco; Danyluk, Michelle D; Suslow, Trevor V

    2012-02-01

    Standard postharvest unit operations that rely on copious water contact, such as fruit unloading and washing, approach the criteria for a true critical control point in fresh tomato production. Performance data for approved sanitizers that reflect commercial systems are needed to set standards for audit compliance. This study was conducted to evaluate the efficacy of chlorine dioxide (ClO(2)) for water disinfection as an objective assessment of recent industry-adopted standards for dump tank and flume management in fresh tomato packing operations. On-site assessments were conducted during eight temporally distinct shifts in two Florida packinghouses and one California packinghouse. Microbiological analyses of incoming and washed fruit and dump and flume system water were evaluated. Water temperature, pH, turbidity, conductivity, and oxidation-reduction potential (ORP) were monitored. Reduction in populations of mesophilic and coliform bacteria on fruit was not significant, and populations were significantly higher (P < 0.05) after washing. Escherichia coli was near the limit of detection in dump tanks but consistently below the detection limit in flumes. Turbidity and conductivity increased with loads of incoming tomatoes. Water temperature varied during daily operations, but pH and ORP mostly remained constant. The industry standard positive temperature differential of 5.5°C between water and fruit pulp was not maintained in tanks during the full daily operation. ORP values were significantly higher in the flume than in the dump tank. A positive correlation was found between ORP and temperature, and negative correlations were found between ORP and turbidity, total mesophilic bacteria, and coliforms. This study provides in-plant data indicating that ClO(2) can be an effective sanitizer in flume and spray-wash systems, but current operational limitations restrict its performance in dump tanks. Under current conditions, ClO(2) alone is unlikely to allow the fresh

  7. 20 CFR 401.90 - Contractors.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Contractors. 401.90 Section 401.90 Employees... Privacy Act § 401.90 Contractors. (a) All contracts which require a contractor to maintain, or on behalf... requiring the contractor to comply with the Privacy Act and this part. (b) A contractor and any employee of...

  8. Strategy Plan A Methodology to Predict the Uniformity of Double-Shell Tank Waste Slurries Based on Mixing Pump Operation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    J.A. Bamberger; L.M. Liljegren; P.S. Lowery

    This document presents an analysis of the mechanisms influencing mixing within double-shell slurry tanks. A research program to characterize mixing of slurries within tanks has been proposed. The research program presents a combined experimental and computational approach to produce correlations describing the tank slurry concentration profile (and therefore uniformity) as a function of mixer pump operating conditions. The TEMPEST computer code was used to simulate both a full-scale (prototype) and scaled (model) double-shell waste tank to predict flow patterns resulting from a stationary jet centered in the tank. The simulation results were used to evaluate flow patterns in the tankmore » and to determine whether flow patterns are similar between the full-scale prototype and an existing 1/12-scale model tank. The flow patterns were sufficiently similar to recommend conducting scoping experiments at 1/12-scale. Also, TEMPEST modeled velocity profiles of the near-floor jet were compared to experimental measurements of the near-floor jet with good agreement. Reported values of physical properties of double-shell tank slurries were analyzed to evaluate the range of properties appropriate for conducting scaled experiments. One-twelfth scale scoping experiments are recommended to confirm the prioritization of the dimensionless groups (gravitational settling, Froude, and Reynolds numbers) that affect slurry suspension in the tank. Two of the proposed 1/12-scale test conditions were modeled using the TEMPEST computer code to observe the anticipated flow fields. This information will be used to guide selection of sampling probe locations. Additional computer modeling is being conducted to model a particulate laden, rotating jet centered in the tank. The results of this modeling effort will be compared to the scaled experimental data to quantify the agreement between the code and the 1/12-scale experiment. The scoping experiment results will guide selection of parameters

  9. 48 CFR 970.0371-7 - Outside employment of contractor employees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business.... Employees of a management and operating contractor are entitled to the same rights and privileges with... full or part-time basis under a DOE management and operating contract may engage in employment outside...

  10. Defense Primer: DOD Contractors

    DTIC Science & Technology

    2017-02-10

    contractors . A defense contractor , as defined by the Code of Federal Regulations, is “any individual, firm, corporation, partnership, association...158.3, “Definitions”). Within the defense policy community, the term contractor is commonly used in two different contexts. The word can describe

  11. 40 CFR 265.1085 - Standards: Tanks.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... wind, moisture, and sunlight; and the operating practices used for the tank on which the fixed roof is... exposure to wind, moisture, and sunlight; and the operating practices used for the tank on which the fixed... so to avoid an unsafe condition. (3) The owner or operator shall inspect and monitor the air emission...

  12. 40 CFR 265.1085 - Standards: Tanks.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... wind, moisture, and sunlight; and the operating practices used for the tank on which the fixed roof is... exposure to wind, moisture, and sunlight; and the operating practices used for the tank on which the fixed... so to avoid an unsafe condition. (3) The owner or operator shall inspect and monitor the air emission...

  13. 40 CFR 265.1085 - Standards: Tanks.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... wind, moisture, and sunlight; and the operating practices used for the tank on which the fixed roof is... exposure to wind, moisture, and sunlight; and the operating practices used for the tank on which the fixed... so to avoid an unsafe condition. (3) The owner or operator shall inspect and monitor the air emission...

  14. 40 CFR 265.1085 - Standards: Tanks.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... wind, moisture, and sunlight; and the operating practices used for the tank on which the fixed roof is... exposure to wind, moisture, and sunlight; and the operating practices used for the tank on which the fixed... so to avoid an unsafe condition. (3) The owner or operator shall inspect and monitor the air emission...

  15. 7 CFR 58.422 - Brine tank.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 3 2014-01-01 2014-01-01 false Brine tank. 58.422 Section 58.422 Agriculture....422 Brine tank. The brine tank shall be constructed of suitable non-toxic material and should be resistant to corrosion, pitting or flaking. The brine tank shall be operated so as to assure the brine is...

  16. 7 CFR 58.422 - Brine tank.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 3 2012-01-01 2012-01-01 false Brine tank. 58.422 Section 58.422 Agriculture....422 Brine tank. The brine tank shall be constructed of suitable non-toxic material and should be resistant to corrosion, pitting or flaking. The brine tank shall be operated so as to assure the brine is...

  17. 7 CFR 58.422 - Brine tank.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 3 2013-01-01 2013-01-01 false Brine tank. 58.422 Section 58.422 Agriculture....422 Brine tank. The brine tank shall be constructed of suitable non-toxic material and should be resistant to corrosion, pitting or flaking. The brine tank shall be operated so as to assure the brine is...

  18. 7 CFR 58.422 - Brine tank.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 3 2011-01-01 2011-01-01 false Brine tank. 58.422 Section 58.422 Agriculture....422 Brine tank. The brine tank shall be constructed of suitable non-toxic material and should be resistant to corrosion, pitting or flaking. The brine tank shall be operated so as to assure the brine is...

  19. 22 CFR 136.6 - Contractors.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Contractors. 136.6 Section 136.6 Foreign... Contractors. To the extent that contractors enjoy importation or tax privileges in a foreign country because... provisions in their contracts that require the contractors to observe the requirements of these regulations...

  20. TANK48 CFD MODELING ANALYSIS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lee, S.

    2011-05-17

    The process of recovering the waste in storage tanks at the Savannah River Site (SRS) typically requires mixing the contents of the tank to ensure uniformity of the discharge stream. Mixing is accomplished with one to four dual-nozzle slurry pumps located within the tank liquid. For the work, a Tank 48 simulation model with a maximum of four slurry pumps in operation has been developed to estimate flow patterns for efficient solid mixing. The modeling calculations were performed by using two modeling approaches. One approach is a single-phase Computational Fluid Dynamics (CFD) model to evaluate the flow patterns and qualitativemore » mixing behaviors for a range of different modeling conditions since the model was previously benchmarked against the test results. The other is a two-phase CFD model to estimate solid concentrations in a quantitative way by solving the Eulerian governing equations for the continuous fluid and discrete solid phases over the entire fluid domain of Tank 48. The two-phase results should be considered as the preliminary scoping calculations since the model was not validated against the test results yet. A series of sensitivity calculations for different numbers of pumps and operating conditions has been performed to provide operational guidance for solids suspension and mixing in the tank. In the analysis, the pump was assumed to be stationary. Major solid obstructions including the pump housing, the pump columns, and the 82 inch central support column were included. The steady state and three-dimensional analyses with a two-equation turbulence model were performed with FLUENT{trademark} for the single-phase approach and CFX for the two-phase approach. Recommended operational guidance was developed assuming that local fluid velocity can be used as a measure of sludge suspension and spatial mixing under single-phase tank model. For quantitative analysis, a two-phase fluid-solid model was developed for the same modeling conditions as the

  1. 75 FR 2926 - Pipeline Safety: Reporting Drug and Alcohol Test Results for Contractors and Multiple Operator...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-19

    ... Management Information System (DAMIS) to allow the reporting of contractor data without duplication and will begin collecting annual drug and alcohol testing data for contractor employees with Management... regulated by 49 CFR Parts 192, 193, and 195. In a final rule titled ``Management Information System (MIS...

  2. Applying Hanford Tank Mixing Data to Define Pulse Jet Mixer Operation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wells, Beric E.; Bamberger, Judith A.; Recknagle, Kurtis P.

    Pulse jet mixed (PJM) process vessels are being developed for storing, blending, and chemical processing of nuclear waste slurries at the Waste Treatment and Immobilization Plant (WTP) to be built at Hanford, Washington. These waste slurries exhibit variable process feed characteristics including Newtonian to non-Newtonian rheologies over a range of solids loadings. Waste feed to the WTP from the Hanford Tank Farms will be accomplished via the Waste Feed Delivery (WFD) system which includes million-gallon underground storage double-shell tanks (DSTs) with dual-opposed jet mixer pumps. Experience using WFD type jet mixer pumps to mobilize actual Hanford waste in DSTs maymore » be used to establish design threshold criteria of interest to pulse jet mixed process vessel operation. This paper describes a method to evaluate the pulse jet mixed vessel capability to process waste based on information obtained during mobilizing and suspending waste by the WFD system jet mixer pumps in a DST. Calculations of jet velocity and wall shear stress in a specific pulse jet mixed process vessel were performed using a commercial computational fluid dynamics (CFD) code. The CFD-modelled process vessel consists of a 4.9-m- (16-ft-) diameter tank with a 2:1 semi-elliptical head, a single, 10-cm (4-in.) downward facing 60-degree conical nozzle, and a 0.61-m (24-in.) inside diameter PJM. The PJM is located at 70% of the vessel radius with the nozzle stand-off-distance 14 cm (6 in.) above the vessel head. The CFD modeled fluid velocity and wall shear stress can be used to estimate vessel waste-processing performance by comparison to available actual WFD system process data. Test data from the operation of jet mixer pumps in the 23-m (75-ft) diameter DSTs have demonstrated mobilization, solid particles in a sediment matrix were moved from their initial location, and suspension, mobilized solid particles were moved to a higher elevation in the vessel than their initial location, of waste

  3. Influence of sludge properties and hydraulic loading on the performance of secondary settling tanks--full-scale operational results.

    PubMed

    Vestner, R J; Günthert, F Wolfgang

    2004-01-01

    Full-scale investigations at a WWTP with a two-stage secondary settling tank process revealed relationships between significant operating parameters and performance in terms of effluent suspended solids concentration. Besides common parameters (e.g. surface overflow rate and sludge volume loading rate) feed SS concentration and flocculation time must be considered. Concentration of the return activated sludge may help to estimate the performance of existing secondary settling tanks.

  4. HANFORD DOUBLE SHELL TANK (DST) THERMAL & SEISMIC PROJECT BUCKLING EVALUATION METHODS & RESULTS FOR THE PRIMARY TANKS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MACKEY, T.C.

    2006-03-17

    This report documents a detailed buckling evaluation of the primary tanks in the Hanford double shell waste tanks. The analysis is part of a comprehensive structural review for the Double-Shell Tank Integrity Project. This work also provides information on tank integrity that specifically responds to concerns raise by the Office of Environment, Safety, and Health (ES&H) Oversight (EH-22) during a review (in April and May 2001) of work being performed on the double-shell tank farms, and the operation of the aging waste facility (AWF) primary tank ventilation system.

  5. Plans for Assessing Contractor Performance for the Camp Lemonnier Base Operations Support Contract Needed Improvement

    DTIC Science & Technology

    2015-08-27

    ensure the functional assessment plans ( FAP ) for the three services contained all contractor work requiring assessment, measurable performance...review the FAPs after development and revisions to the FAPs , and did not require additional controls over the contractor assessment process in an...revised as follows: • Business Management System B-14.3 was updated to require the contract officer representative conduct a FAP review to ensure

  6. High-performance recombinant protein production with Escherichia coli in continuously operated cascades of stirred-tank reactors.

    PubMed

    Schmideder, Andreas; Weuster-Botz, Dirk

    2017-07-01

    The microbial expression of intracellular, recombinant proteins in continuous bioprocesses suffers from low product concentrations. Hence, a process for the intracellular production of photoactivatable mCherry with Escherichia coli in a continuously operated cascade of two stirred-tank reactors was established to separate biomass formation (first reactor) and protein expression (second reactor) spatially. Cascades of miniaturized stirred-tank reactors were implemented, which enable the 24-fold parallel characterization of cascade processes and the direct scale-up of results to the liter scale. With PAmCherry concentrations of 1.15 g L -1 cascades of stirred-tank reactors improved the process performance significantly compared to production processes in chemostats. In addition, an optimized fed-batch process was outperformed regarding space-time yield (149 mg L -1  h -1 ). This study implicates continuous cascade processes to be a promising alternative to fed-batch processes for microbial protein production and demonstrates that miniaturized stirred-tank reactors can reduce the timeline and costs for cascade process characterization.

  7. 7 CFR 1788.12 - Contractors' bonds.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 12 2010-01-01 2010-01-01 false Contractors' bonds. 1788.12 Section 1788.12... Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.12 Contractors' bonds. Electric borrowers shall require contractors to obtain contractors' bonds when required by part 1726...

  8. [High Pressure Gas Tanks

    NASA Technical Reports Server (NTRS)

    Quintana, Rolando

    2002-01-01

    Four high-pressure gas tanks, the basis of this study, were especially made by a private contractor and tested before being delivered to NASA Kennedy Space Center. In order to insure 100% reliability of each individual tank the staff at KSC decided to again submit the four tanks under more rigorous tests. These tests were conducted during a period from April 10 through May 8 at KSC. This application further validates the predictive safety model for accident prevention and system failure in the testing of four high-pressure gas tanks at Kennedy Space Center, called Continuous Hazard Tracking and Failure Prediction Methodology (CHTFPM). It is apparent from the variety of barriers available for a hazard control that some barriers will be more successful than others in providing protection. In order to complete the Barrier Analysis of the system, a Task Analysis and a Biomechanical Study were performed to establish the relationship between the degree of biomechanical non-conformities and the anomalies found within the system on particular joints of the body. This relationship was possible to obtain by conducting a Regression Analysis to the previously generated data. From the information derived the body segment with the lowest percentage of non-conformities was the neck flexion with 46.7%. Intense analysis of the system was conducted including Preliminary Hazard Analysis (PHA), Failure Mode and Effect Analysis (FMEA), and Barrier Analysis. These analyses resulted in the identification of occurrences of conditions, which may be becoming hazardous in the given system. These conditions, known as dendritics, may become hazards and could result in an accident, system malfunction, or unacceptable risk conditions. A total of 56 possible dendritics were identified. Work sampling was performed to observe the occurrence each dendritic. The out of control points generated from a Weighted c control chart along with a Pareto analysis indicate that the dendritics "Personnel not

  9. TANK 21 AND TANK 24 BLEND AND FEED STUDY: BLENDING TIMES, SETTLING TIMES, AND TRANSFERS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lee, S.; Leishear, R.; Poirier, M.

    2012-05-31

    The Salt Disposition Integration (SDI) portfolio of projects provides the infrastructure within existing Liquid Waste facilities to support the startup and long term operation of the Salt Waste Processing Facility (SWPF). Within SDI, the Blend and Feed Project will equip existing waste tanks in the Tank Farms to serve as Blend Tanks where salt solutions of up to 1.2 million gallons will be blended in 1.3 million gallon tanks and qualified for use as feedstock for SWPF. In particular, Tanks 21 and 24 are planned to be used for blending and transferring to the SDI feed tank. These tanks weremore » evaluated here to determine blending times, to determine a range of settling times for disturbed sludge, and to determine that the SWPF Waste Acceptance Criteria that less than 1200 mg/liter of solids will be entrained in salt solutions during transfers from the Tank 21 and Tank 24 will be met. Overall conclusions for Tank 21 and Tank 24 operations include: (1) Experimental correction factors were applied to CFD (computational fluid dynamics) models to establish blending times between approximately two and five hours. As shown in Phase 2 research, blending times may be as much as ten times greater, or more, if lighter fluids are added to heavier fluids (i.e., water added to salt solution). As the densities of two salt solutions converge this effect may be minimized, but additional confirmatory research was not performed. (2) At the current sludge levels and the presently planned operating heights of the transfer pumps, solids entrainment will be less than 1200 mg/liter, assuming a conservative, slow settling sludge simulant. (3) Based on theoretical calculations, particles in the density range of 2.5 to 5.0 g/mL must be greater than 2-4 {micro}m in diameter to ensure they settle adequately in 30-60 days to meet the SWPF feed criterion (<1200 mg/l). (4) Experimental tests with sludge batch 6 simulant and field turbidity data from a recent Tank 21 mixing evolution suggest

  10. Chemical and chemically-related considerations associated with sluicing tank C-106 waste to tank AY-102

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Reynolds, D.A.

    1997-04-04

    New data on tank 241-C-106 were obtained from grab sampling and from compatibility testing of tank C-106 and tank AY-102 wastes. All chemistry-associated and other compatibility Information compiled in this report strongly suggests that the sluicing of the contents of tank C-106, in accord with appropriate controls, will pose no unacceptable risk to workers, public safety, or the environment. In addition, it is expected that the sluicing operation will successfully resolve the High-Heat Safety Issue for tank C-106.

  11. 23 CFR 635.116 - Subcontracting and contractor responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.116 Subcontracting and contractor responsibilities. (a) Contracts for projects shall specify the minimum percentage of work that a... total original contract price excluding any identified specialty items. Specialty items may be performed...

  12. 40 CFR 264.1084 - Standards: Tanks.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... effects of outdoor exposure to wind, moisture, and sunlight; and the operating practices used for the tank... contact with the liquid and its vapor managed in the tank; the effects of outdoor exposure to wind...) The owner or operator shall inspect and monitor the air emission control equipment in accordance with...

  13. 40 CFR 264.1084 - Standards: Tanks.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... effects of outdoor exposure to wind, moisture, and sunlight; and the operating practices used for the tank... contact with the liquid and its vapor managed in the tank; the effects of outdoor exposure to wind...) The owner or operator shall inspect and monitor the air emission control equipment in accordance with...

  14. 40 CFR 264.1084 - Standards: Tanks.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... effects of outdoor exposure to wind, moisture, and sunlight; and the operating practices used for the tank... contact with the liquid and its vapor managed in the tank; the effects of outdoor exposure to wind...) The owner or operator shall inspect and monitor the air emission control equipment in accordance with...

  15. 40 CFR 264.1084 - Standards: Tanks.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... effects of outdoor exposure to wind, moisture, and sunlight; and the operating practices used for the tank... contact with the liquid and its vapor managed in the tank; the effects of outdoor exposure to wind...) The owner or operator shall inspect and monitor the air emission control equipment in accordance with...

  16. 33 CFR 155.810 - Tank vessel security.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Tank vessel security. 155.810..., Procedures, Equipment, and Records § 155.810 Tank vessel security. Operators of tank vessels carrying more oil cargo residue than normal in any cargo tank must assign a surveillance person or persons...

  17. 33 CFR 155.810 - Tank vessel security.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Tank vessel security. 155.810..., Procedures, Equipment, and Records § 155.810 Tank vessel security. Operators of tank vessels carrying more oil cargo residue than normal in any cargo tank must assign a surveillance person or persons...

  18. Contingency Contractor Optimization Phase 3 Sustainment Platform Requirements - Contingency Contractor Optimization Tool - Prototype

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa

    Sandia National Laboratories (Sandia) is in Phase 3 Sustainment of development of a prototype tool, currently referred to as the Contingency Contractor Optimization Tool - Prototype (CCOTP), under the direction of OSD Program Support. CCOT-P is intended to help provide senior Department of Defense (DoD) leaders with comprehensive insight into the global availability, readiness and capabilities of the Total Force Mix. The CCOT-P will allow senior decision makers to quickly and accurately assess the impacts, risks and mitigating strategies for proposed changes to force/capabilities assignments, apportionments and allocations options, focusing specifically on contingency contractor planning. During Phase 2 of themore » program, conducted during fiscal year 2012, Sandia developed an electronic storyboard prototype of the Contingency Contractor Optimization Tool that can be used for communication with senior decision makers and other Operational Contract Support (OCS) stakeholders. Phase 3 used feedback from demonstrations of the electronic storyboard prototype to develop an engineering prototype for planners to evaluate. Sandia worked with the DoD and Joint Chiefs of Staff strategic planning community to get feedback and input to ensure that the engineering prototype was developed to closely align with future planning needs. The intended deployment environment was also a key consideration as this prototype was developed. Initial release of the engineering prototype was done on servers at Sandia in the middle of Phase 3. In 2013, the tool was installed on a production pilot server managed by the OUSD(AT&L) eBusiness Center. The purpose of this document is to specify the CCOT-P engineering prototype platform requirements as of May 2016. Sandia developed the CCOT-P engineering prototype using common technologies to minimize the likelihood of deployment issues. CCOT-P engineering prototype was architected and designed to be as independent as possible of the major

  19. Enhanced sludge reduction in septic tanks by increasing temperature.

    PubMed

    Pussayanavin, Tatchai; Koottatep, Thammarat; Eamrat, Rawintra; Polprasert, Chongrak

    2015-01-01

    Septic tanks in most developing countries are constructed without drainage trenches or leaching fields to treat toilet wastewater and /or grey water. Due to the short hydraulic retention time, effluents of these septic tanks are still highly polluted, and there is usually high accumulation of septic tank sludge or septage containing high levels of organics and pathogens that requires frequent desludging and subsequent treatment. This study aimed to reduce sludge accumulation in septic tanks by increasing temperatures of the septic tank content. An experimental study employing two laboratory-scale septic tanks fed with diluted septage and operating at temperatures of 40 and 30°C was conducted. At steady-state conditions, there were more methanogenic activities occurring in the sludge layer of the septic tank operating at the temperature of 40°C, resulting in less total volatile solids (TVS) or sludge accumulation and more methane (CH4) production than in the unit operating at 30°C. Molecular analysis found more abundance and diversity of methanogenic microorganisms in the septic tank sludge operating at 40°C than at 30°C. The reduced TVS accumulation in the 40°C septic tank would lengthen the period of septage removal, resulting in a cost-saving in desluging and septage treatment. Cost-benefit analysis of increasing temperatures in septic tanks was discussed.

  20. 48 CFR 52.225-26 - Contractors Performing Private Security Functions Outside the United States.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., helicopters, and other military vehicles operated by Contractors performing private security functions; and... Private Security Functions Outside the United States. 52.225-26 Section 52.225-26 Federal Acquisition... CONTRACT CLAUSES Text of Provisions and Clauses 52.225-26 Contractors Performing Private Security Functions...

  1. 48 CFR 52.225-26 - Contractors Performing Private Security Functions Outside the United States.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., helicopters, and other military vehicles operated by Contractors performing private security functions; and... Private Security Functions Outside the United States. 52.225-26 Section 52.225-26 Federal Acquisition... CONTRACT CLAUSES Text of Provisions and Clauses 52.225-26 Contractors Performing Private Security Functions...

  2. 40 CFR 61.351 - Alternative standards for tanks.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 9 2014-07-01 2014-07-01 false Alternative standards for tanks. 61.351... Waste Operations § 61.351 Alternative standards for tanks. (a) As an alternative to the standards for tanks specified in § 61.343 of this subpart, an owner or operator may elect to comply with one of the...

  3. 40 CFR 61.351 - Alternative standards for tanks.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 9 2013-07-01 2013-07-01 false Alternative standards for tanks. 61.351... Waste Operations § 61.351 Alternative standards for tanks. (a) As an alternative to the standards for tanks specified in § 61.343 of this subpart, an owner or operator may elect to comply with one of the...

  4. Contingency Contractor Optimization Phase 3 Sustainment Software Design Document - Contingency Contractor Optimization Tool - Prototype

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa

    This document describes the final software design of the Contingency Contractor Optimization Tool - Prototype. Its purpose is to provide the overall architecture of the software and the logic behind this architecture. Documentation for the individual classes is provided in the application Javadoc. The Contingency Contractor Optimization project is intended to address Department of Defense mandates by delivering a centralized strategic planning tool that allows senior decision makers to quickly and accurately assess the impacts, risks, and mitigation strategies associated with utilizing contract support. The Contingency Contractor Optimization Tool - Prototype was developed in Phase 3 of the OSD ATLmore » Contingency Contractor Optimization project to support strategic planning for contingency contractors. The planning tool uses a model to optimize the Total Force mix by minimizing the combined total costs for selected mission scenarios. The model optimizes the match of personnel types (military, DoD civilian, and contractors) and capabilities to meet mission requirements as effectively as possible, based on risk, cost, and other requirements.« less

  5. ESP`s Tank 42 washwater transfer to the 241-F/H tank farms

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Aponte, C.I.; Lee, E.D.

    1997-12-01

    As a result of the separation of the High-Level Liquid Waste Department into three separate organizations (formerly there were two) (Concentration, Storage, and Transfer (CST), Waste Pre-Treatment (WPT) and Waste Disposition (WD)) process interface controls were required. One of these controls is implementing the Waste the waste between CST and WPT. At present, CST`s Waste Acceptance Criteria is undergoing revision and WPT has not prepared the required Waste Compliance Plan (WCP). The Waste Pre-Treatment organization is making preparations for transferring spent washwater in Tank 42 to Tank 43 and/or Tank 22. The washwater transfer is expected to complete the washingmore » steps for preparing ESP batch 1B sludge. This report is intended to perform the function of a Waste Compliance Plan for the proposed transfer. Previously, transfers between the Tank Farm and ITP/ESP were controlled by requirements outlined in the Tank Farm`s Technical Standards and ITP/ESP`s Process Requirements. Additionally, these controls are implemented primarily in operating procedure 241-FH-7TSQ and ITP Operations Manual SW16.1-SOP-WTS-1 which will be completed prior to performing the waste transfers.« less

  6. 7 CFR 1788.12 - Contractors' bonds.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.12 Contractors' bonds. Electric borrowers shall require contractors to obtain contractors' bonds when required by part 1726...

  7. 7 CFR 1788.12 - Contractors' bonds.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.12 Contractors' bonds. Electric borrowers shall require contractors to obtain contractors' bonds when required by part 1726...

  8. 7 CFR 1788.12 - Contractors' bonds.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.12 Contractors' bonds. Electric borrowers shall require contractors to obtain contractors' bonds when required by part 1726...

  9. 7 CFR 1788.12 - Contractors' bonds.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.12 Contractors' bonds. Electric borrowers shall require contractors to obtain contractors' bonds when required by part 1726...

  10. 76 FR 39015 - Contractor Performance Information

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-05

    ...] Contractor Performance Information AGENCY: Environmental Protection Agency (EPA), ACTION: Direct final rule... contractor performance information. EPA is issuing a final rule because the changes are procedural in nature... Institutes of Health's Contractor Performance System (CPS) to the Department of Defense's Contractor...

  11. The Gunite and Associated Tanks Remediation Project Tank Waste Retrieval Performance and Lessons Learned, vol. 1 [of 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lewis, BE

    2003-10-07

    The Gunite and Associated Tanks (GAAT) Remediation Project was the first of its kind performed in the United States. Robotics and remotely operated equipment were used to successfully transfer almost 94,000 gal of remote-handled transuranic sludge containing over 81,000 Ci of radioactive contamination from nine large underground storage tanks at the Oak Ridge National Laboratory (ORNL). The sludge was transferred with over 439,000 gal of radioactive waste supernatant and {approx}420,500 gal of fresh water that was used in sluicing operations. The GAATs are located in a high-traffic area of ORNL near a main thoroughfare. A phased and integrated approach tomore » waste retrieval operations was used for the GAAT Remediation Project. The project promoted safety by obtaining experience from low-risk operations in the North Tank Farm before moving to higher-risk operations in the South Tank Farm. This approach allowed project personnel to become familiar with the tanks and waste, as well as the equipment, processes, procedures, and operations required to perform successful waste retrieval. By using an integrated approach to tank waste retrieval and tank waste management, the project was completed years ahead of the original baseline schedule, which resulted in avoiding millions of dollars in associated costs. This report is organized in two volumes. Volume 1 provides information on the various phases of the GAAT Remediation Project. It also describes the different types of equipment and how they were used. The emphasis of Volume 1 is on the description of the tank waste retrieval performance and the lessons learned during the GAAT Remediation Project. Volume 2 provides the appendixes for the report, which include the following information: (A) Background Information for the Gunite and Associated Tanks Operable Unit; (B) Annotated Bibliography; (C) Comprehensive Listing of the Sample Analysis Data from the GAAT Remediation Project; (D) GAAT Equipment Matrix; and (E

  12. 48 CFR 46.105 - Contractor responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor... CONTRACT MANAGEMENT QUALITY ASSURANCE General 46.105 Contractor responsibilities. (a) The contractor is..., and furnishing such information to the Government as required. (b) The contractor may be required to...

  13. 49 CFR 172.331 - Bulk packagings other than portable tanks, cargo tanks, tank cars and multi-unit tank car tanks.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 2 2012-10-01 2012-10-01 false Bulk packagings other than portable tanks, cargo tanks, tank cars and multi-unit tank car tanks. 172.331 Section 172.331 Transportation Other Regulations... packagings other than portable tanks, cargo tanks, tank cars and multi-unit tank car tanks. (a) Each person...

  14. 49 CFR 172.331 - Bulk packagings other than portable tanks, cargo tanks, tank cars and multi-unit tank car tanks.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 2 2010-10-01 2010-10-01 false Bulk packagings other than portable tanks, cargo tanks, tank cars and multi-unit tank car tanks. 172.331 Section 172.331 Transportation Other Regulations... packagings other than portable tanks, cargo tanks, tank cars and multi-unit tank car tanks. (a) Each person...

  15. 49 CFR 172.331 - Bulk packagings other than portable tanks, cargo tanks, tank cars and multi-unit tank car tanks.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 2 2014-10-01 2014-10-01 false Bulk packagings other than portable tanks, cargo tanks, tank cars and multi-unit tank car tanks. 172.331 Section 172.331 Transportation Other Regulations... packagings other than portable tanks, cargo tanks, tank cars and multi-unit tank car tanks. (a) Each person...

  16. 49 CFR 172.331 - Bulk packagings other than portable tanks, cargo tanks, tank cars and multi-unit tank car tanks.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 2 2011-10-01 2011-10-01 false Bulk packagings other than portable tanks, cargo tanks, tank cars and multi-unit tank car tanks. 172.331 Section 172.331 Transportation Other Regulations... packagings other than portable tanks, cargo tanks, tank cars and multi-unit tank car tanks. (a) Each person...

  17. 49 CFR 172.331 - Bulk packagings other than portable tanks, cargo tanks, tank cars and multi-unit tank car tanks.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 2 2013-10-01 2013-10-01 false Bulk packagings other than portable tanks, cargo tanks, tank cars and multi-unit tank car tanks. 172.331 Section 172.331 Transportation Other Regulations... packagings other than portable tanks, cargo tanks, tank cars and multi-unit tank car tanks. (a) Each person...

  18. Development and validation of a strategic repositioning model for defense and aerospace contractors

    NASA Astrophysics Data System (ADS)

    Bers, John A.

    Strategic repositioning refers to the organized efforts of defense contractors to "reposition" a technology that they have developed for a defense sector customer into a civilian or commercial market. The strategic repositioning model developed here is a structural model: it seeks to isolate the factors that influence choice of strategy, which in turn influences the organization's performance. The model draws from the prior experience of contractors (through interviews and surveys) and companies in other sectors (through a review of the relevant published research). (1) Over all, the model accounted for 55% of the variance in financial performance of the sample and 35% for the underlying population. (2) Key success factors include a rigorous planning process, a target market in the growth (vs. incubation) stage, a priority on market leadership as well as financial return, the ability to operate in an ambiguous business environment, and a relatively short time horizon but strong corporate support. (3) The greatest challenges that a contractor is likely to encounter are understanding his new customers' buying practices, strong competition, and adapting his technology to their needs and price expectations. (4) To address these issues contractors often involve partners in their entry strategy, but partnerships of equals tend to be more difficult to bring off than direct entry strategies. (5) The two major target market categories--government and commercial--present different challenges. Commercial customers are more likely to resist doing business with the contractor, while contractors entering government and other noncommercial markets are more likely to encounter price resistance, low technical sophistication among customers, and difficulties reaching their customer base. (6) Despite these differences across markets, performance is not influenced by the target market category, nor by the type of product or service or the contractor's functional orientation (marketing

  19. DEMONSTRATION OF THE NEXT-GENERATION CAUSTIC-SIDE SOLVENT EXTRACTION SOLVENT WITH 2-CM CENTRIFUGAL CONTRACTORS USING TANK 49H WASTE AND WASTE SIMULANT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pierce, R.; Peters, T.; Crowder, M.

    2011-09-27

    Researchers successfully demonstrated the chemistry and process equipment of the Caustic-Side Solvent Extraction (CSSX) flowsheet using MaxCalix for the decontamination of high level waste (HLW). The demonstration was completed using a 12-stage, 2-cm centrifugal contactor apparatus at the Savannah River National Laboratory (SRNL). This represents the first CSSX process demonstration of the MaxCalix solvent system with Savannah River Site (SRS) HLW. Two tests lasting 24 and 27 hours processed non-radioactive simulated Tank 49H waste and actual Tank 49H HLW, respectively. Conclusions from this work include the following. The CSSX process is capable of reducing {sup 137}Cs in high level radioactivemore » waste by a factor of more than 40,000 using five extraction, two scrub, and five strip stages. Tests demonstrated extraction and strip section stage efficiencies of greater than 93% for the Tank 49H waste test and greater than 88% for the simulant waste test. During a test with HLW, researchers processed 39 liters of Tank 49H solution and the waste raffinate had an average decontamination factor (DF) of 6.78E+04, with a maximum of 1.08E+05. A simulant waste solution ({approx}34.5 liters) with an initial Cs concentration of 83.1 mg/L was processed and had an average DF greater than 5.9E+03, with a maximum DF of greater than 6.6E+03. The difference may be attributable to differences in contactor stage efficiencies. Test results showed the solvent can be stripped of cesium and recycled for {approx}25 solvent turnovers without the occurrence of any measurable solvent degradation or negative effects from minor components. Based on the performance of the 12-stage 2-cm apparatus with the Tank 49H HLW, the projected DF for MCU with seven extraction, two scrub, and seven strip stages operating at a nominal efficiency of 90% is {approx}388,000. At 95% stage efficiency, the DF in MCU would be {approx}3.2 million. Carryover of organic solvent in aqueous streams (and aqueous in

  20. Hazard and operability study of the multi-function Waste Tank Facility. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hughes, M.E.

    1995-05-15

    The Multi-Function Waste Tank Facility (MWTF) East site will be constructed on the west side of the 200E area and the MWTF West site will be constructed in the SW quadrant of the 200W site in the Hanford Area. This is a description of facility hazards that site personnel or the general public could potentially be exposed to during operation. A list of preliminary Design Basis Accidents was developed.

  1. STRONTIUM-90 LIQUID CONCENTRATION SOLUBILITY CORRELATION IN THE HANFORD TANK WASTE OPERATIONS SIMULATOR

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    HOHL, T.; PLACE, D.; WITTMAN, R.

    2004-08-05

    A new correlation was developed to estimate the concentration of strontium-90 in a waste solution based on total organic carbon. This correlation replaces the strontium-90 wash factors, and when applied in the Hanford Tank Waste Operations Simulator, significantly reduced the estimated quantity of strontium-90 in the delivered low-activity waste feed. This is thought to be a more realistic estimate of strontium-90 than using the wash-factor method.

  2. 40 CFR 68.87 - Contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Contractors. 68.87 Section 68.87... ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.87 Contractors. (a) Application. This section applies to contractors performing maintenance or repair, turnaround, major renovation, or...

  3. 46 CFR 296.20 - Tank vessels.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 8 2011-10-01 2011-10-01 false Tank vessels. 296.20 Section 296.20 Shipping MARITIME... SECURITY PROGRAM (MSP) Priority for Granting Applications § 296.20 Tank vessels. (a) First priority for the award of MSP Operating Agreements under MSA 2003 shall be granted to a tank vessel that is constructed...

  4. 46 CFR 296.20 - Tank vessels.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 8 2013-10-01 2013-10-01 false Tank vessels. 296.20 Section 296.20 Shipping MARITIME... SECURITY PROGRAM (MSP) Priority for Granting Applications § 296.20 Tank vessels. (a) First priority for the award of MSP Operating Agreements under MSA 2003 shall be granted to a tank vessel that is constructed...

  5. 46 CFR 296.20 - Tank vessels.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 8 2014-10-01 2014-10-01 false Tank vessels. 296.20 Section 296.20 Shipping MARITIME... SECURITY PROGRAM (MSP) Priority for Granting Applications § 296.20 Tank vessels. (a) First priority for the award of MSP Operating Agreements under MSA 2003 shall be granted to a tank vessel that is constructed...

  6. 46 CFR 296.20 - Tank vessels.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 8 2010-10-01 2010-10-01 false Tank vessels. 296.20 Section 296.20 Shipping MARITIME... SECURITY PROGRAM (MSP) Priority for Granting Applications § 296.20 Tank vessels. (a) First priority for the award of MSP Operating Agreements under MSA 2003 shall be granted to a tank vessel that is constructed...

  7. 46 CFR 296.20 - Tank vessels.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 8 2012-10-01 2012-10-01 false Tank vessels. 296.20 Section 296.20 Shipping MARITIME... SECURITY PROGRAM (MSP) Priority for Granting Applications § 296.20 Tank vessels. (a) First priority for the award of MSP Operating Agreements under MSA 2003 shall be granted to a tank vessel that is constructed...

  8. 14 CFR 25.1013 - Oil tanks.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... tank used with a turbine engine must have an expansion space of not less than 10 percent of the tank... must be arranged so that condensed water vapor that might freeze and obstruct the line cannot... operating temperature. There must be a shutoff valve at the outlet of each oil tank used with a turbine...

  9. 14 CFR 25.1013 - Oil tanks.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... tank used with a turbine engine must have an expansion space of not less than 10 percent of the tank... must be arranged so that condensed water vapor that might freeze and obstruct the line cannot... operating temperature. There must be a shutoff valve at the outlet of each oil tank used with a turbine...

  10. 14 CFR 25.1013 - Oil tanks.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... tank used with a turbine engine must have an expansion space of not less than 10 percent of the tank... must be arranged so that condensed water vapor that might freeze and obstruct the line cannot... operating temperature. There must be a shutoff valve at the outlet of each oil tank used with a turbine...

  11. 14 CFR 25.1013 - Oil tanks.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... tank used with a turbine engine must have an expansion space of not less than 10 percent of the tank... must be arranged so that condensed water vapor that might freeze and obstruct the line cannot... operating temperature. There must be a shutoff valve at the outlet of each oil tank used with a turbine...

  12. 14 CFR 25.1013 - Oil tanks.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... tank used with a turbine engine must have an expansion space of not less than 10 percent of the tank... must be arranged so that condensed water vapor that might freeze and obstruct the line cannot... operating temperature. There must be a shutoff valve at the outlet of each oil tank used with a turbine...

  13. 49 CFR 10.27 - Government contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Government contractors. 10.27 Section 10.27... INDIVIDUALS Maintenance of Records § 10.27 Government contractors. When the Department provides by a contract..., Criminal Penalties, any such contractor and any employee of the contractor are considered, in accordance...

  14. 38 CFR 46.8 - Independent contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Independent contractors... contractors. Independent contractors acting on behalf of the Department of Veterans Affairs are subject to the... provide the contractor with notice that a report of a clinical privileges action will be filed with the...

  15. 7 CFR 1726.27 - Contractor's bonds.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Contractor's bonds. 1726.27 Section 1726.27... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES General § 1726.27 Contractor's bonds. (a) RUS Form 168b, Contractor's Bond, shall be used when a contractor's bond is required by RUS Forms 200, 257...

  16. 48 CFR 47.207-5 - Contractor responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor....207-5 Contractor responsibilities. Contractor responsibilities vary with the kinds of freight to be... furnished by the contractor. Otherwise, state that the contractor shall furnish clean and sound closed-type...

  17. The feasibility of trace element supplementation for stable operation of wheat stillage-fed biogas tank reactors.

    PubMed

    Gustavsson, J; Svensson, B H; Karlsson, A

    2011-01-01

    The aim of this study was to investigate the effect of trace element supplementation on operation of wheat stillage-fed biogas tank reactors. The stillage used was a residue from bio-ethanol production, containing high levels of sulfate. In biogas production, high sulfate content has been associated with poor process stability in terms of low methane production and accumulation of process intermediates. However, the results of the present study show that this problem can be overcome by trace element supplementations. Four lab-scale wheat stillage-fed biogas tank reactors were operated for 345 days at a hydraulic retention time of 20 days (37 degrees C). It was concluded that daily supplementation with Co (0.5 mg L(-1)), Ni (0.2 mg L(-1)) and Fe (0.5 g L(-1)) were required for maintaining process stability at the organic loading rate of 4.0 g volatile solids L(-1) day(-1).

  18. 48 CFR 18.102 - Central contractor registration.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Central contractor... Central contractor registration. Contractors are not required to be registered in the Central Contractor.... (See 4.1102). However, contractors are required to register with CCR in order to gain access to the...

  19. Grey-box modelling of aeration tank settling.

    PubMed

    Bechman, Henrik; Nielsen, Marinus K; Poulsen, Niels Kjølstad; Madsen, Henrik

    2002-04-01

    A model of the concentrations of suspended solids (SS) in the aeration tanks and in the effluent from these during Aeration tank settling (ATS) operation is established. The model is based on simple SS mass balances, a model of the sludge settling and a simple model of how the SS concentration in the effluent from the aeration tanks depends on the actual concentrations in the tanks and the sludge blanket depth. The model is formulated in continuous time by means of stochastic differential equations with discrete-time observations. The parameters of the model are estimated using a maximum likelihood method from data from an alternating BioDenipho waste water treatment plant (WWTP). The model is an important tool for analyzing ATS operation and for selecting the appropriate control actions during ATS, as the model can be used to predict the SS amounts in the aeration tanks as well as in the effluent from the aeration tanks.

  20. 48 CFR 970.0309 - Whistleblower Protection of Contractor Employees.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Whistleblower Protection of Contractor Employees. 970.0309 Section 970.0309 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business...

  1. 48 CFR 970.0309 - Whistleblower Protection of Contractor Employees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Whistleblower Protection of Contractor Employees. 970.0309 Section 970.0309 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business...

  2. 48 CFR 939.7002 - Contractor acquisition of information technology.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating (M&O...

  3. 48 CFR 939.7002 - Contractor acquisition of information technology.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating (M&O...

  4. 48 CFR 939.7002 - Contractor acquisition of information technology.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating (M&O...

  5. 48 CFR 939.7002 - Contractor acquisition of information technology.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating (M&O...

  6. 48 CFR 939.7002 - Contractor acquisition of information technology.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating (M&O...

  7. 40 CFR 61.343 - Standards: Tanks.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 8 2011-07-01 2011-07-01 false Standards: Tanks. 61.343 Section 61.343... § 61.343 Standards: Tanks. (a) Except as provided in paragraph (b) of this section and in § 61.351, the owner or operator must meet the standards in paragraph (a)(1) or (2) of this section for each tank in...

  8. 40 CFR 61.343 - Standards: Tanks.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 9 2013-07-01 2013-07-01 false Standards: Tanks. 61.343 Section 61.343... § 61.343 Standards: Tanks. (a) Except as provided in paragraph (b) of this section and in § 61.351, the owner or operator must meet the standards in paragraph (a)(1) or (2) of this section for each tank in...

  9. 40 CFR 61.343 - Standards: Tanks.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 9 2014-07-01 2014-07-01 false Standards: Tanks. 61.343 Section 61.343... § 61.343 Standards: Tanks. (a) Except as provided in paragraph (b) of this section and in § 61.351, the owner or operator must meet the standards in paragraph (a)(1) or (2) of this section for each tank in...

  10. 49 CFR 174.67 - Tank car unloading.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 2 2013-10-01 2013-10-01 false Tank car unloading. 174.67 Section 174.67... and Loading Requirements § 174.67 Tank car unloading. For transloading operations, the following rules... least one wheel to prevent movement in any direction. If multiple tank cars are coupled together...

  11. 49 CFR 174.67 - Tank car unloading.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 2 2012-10-01 2012-10-01 false Tank car unloading. 174.67 Section 174.67... and Loading Requirements § 174.67 Tank car unloading. For transloading operations, the following rules... least one wheel to prevent movement in any direction. If multiple tank cars are coupled together...

  12. 49 CFR 174.67 - Tank car unloading.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 2 2014-10-01 2014-10-01 false Tank car unloading. 174.67 Section 174.67... and Loading Requirements § 174.67 Tank car unloading. For transloading operations, the following rules... least one wheel to prevent movement in any direction. If multiple tank cars are coupled together...

  13. 49 CFR 174.67 - Tank car unloading.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 2 2011-10-01 2011-10-01 false Tank car unloading. 174.67 Section 174.67... and Loading Requirements § 174.67 Tank car unloading. For transloading operations, the following rules... least one wheel to prevent movement in any direction. If multiple tank cars are coupled together...

  14. MIXING STUDY FOR JT-71/72 TANKS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lee, S.

    2013-11-26

    All modeling calculations for the mixing operations of miscible fluids contained in HBLine tanks, JT-71/72, were performed by taking a three-dimensional Computational Fluid Dynamics (CFD) approach. The CFD modeling results were benchmarked against the literature results and the previous SRNL test results to validate the model. Final performance calculations were performed by using the validated model to quantify the mixing time for the HB-Line tanks. The mixing study results for the JT-71/72 tanks show that, for the cases modeled, the mixing time required for blending of the tank contents is no more than 35 minutes, which is well below 2.5more » hours of recirculation pump operation. Therefore, the results demonstrate the adequacy of 2.5 hours’ mixing time of the tank contents by one recirculation pump to get well mixed.« less

  15. 48 CFR 1845.502 - Contractor responsibility.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor responsibility. 1845.502 Section 1845.502 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... Contractors 1845.502 Contractor responsibility. ...

  16. Means of Effective Security Sector Reform: A Comparison of US Military and Contractor Programs

    DTIC Science & Technology

    2011-05-19

    the US Army took over 400 suspension / debarment actions in fiscal year 2010.65 GAO report 11-419T, Foreign Operations: Key Issues for Congressional...Contracting, Ensuring Contractor Accountability: Past Performance and Suspension & Debartment, Testimony, (Washington, D.C.: Commission on Wartime...64 Ibid., 8. 65 Commission on Wartime Contracting, Ensuring Contractor Accountability: Past Performance and Suspension

  17. Composite overwrapped metallic tanks

    NASA Technical Reports Server (NTRS)

    Caudill, C. L.; Kirlin, R. L.

    1972-01-01

    Work is reported for fabricating and testing the fiberglass overwrapped titanium pressure vessel for cryogenic service. Difficulties encountered in the tank liner fabrication phase involved explosive forming, vacuum annealing, chemical milling and electron beam welding. While each of these processes and the nondestructive test methods employed are normally considered to be individually reliable, the combination of poor material together with fabrication and development reversals prevented the full achievement of the desired end results. Eight tanks plus a prototype and tool proofing article were produced. Six of the vessels failed during the hydrostatic sizing operation. One of the remaining tanks was hydrostatically pressurized to burst and the other was pressurized repeatedly at 75 F from 100 psi to the operating pressure until failure occurred. As a result, it is not possible to draw firm conclusions as to the true value of the design concept due to the problems encountered in the program.

  18. 48 CFR 3009.171-8 - Ineligible contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Ineligible contractors..., HOMELAND SECURITY ACQUISITION REGULATION (HSAR) ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 3009.171-8 Ineligible contractors. Any business concern determined to be ineligible...

  19. Accountability Tanks Calibration Data Analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wendelberger, James G.; Salazar, William Richard; Finstad, Casey Charles

    2017-04-25

    MET-1 utilizes tanks to store plutonium in solution. The Nuclear Material Control & Accountability group at LANL requires that MET-1 be able to determine the amount of SNM remaining in solution in the tanks for accountability purposes. For this reason it is desired to determine how well various operators may read the volume of liquid left in the tank with the tank measurement device (glass column or slab). The accuracy of the measurement is then compared to the current SAFE-NMCA acceptance criteria for lean and rich plutonium solutions to determine whether or not the criteria are reasonable and may bemore » met.« less

  20. 48 CFR 1602.170-4 - Contractor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor. 1602.170-4 Section 1602.170-4 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES... 1602.170-4 Contractor. Contractor means carrier. ...

  1. 48 CFR 1609.471 - Contractor certification.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor certification... EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 1609.471 Contractor certification. All FEHBP carriers and applicant carriers...

  2. 48 CFR 752.7013 - Contractor-mission relationships.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor-mission....7013 Contractor-mission relationships. For use in all USAID contracts involving performance overseas.... Contractor-Mission Relationships (OCT 1989) (a) The Contractor acknowledges that this contract is an...

  3. SRS SWPF Construction Completion

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Craig, Jack; Sheppard, Frank; Marks, Pam

    Now that construction is complete, DOE and construction contractor Parsons, are focusing on testing the Savannah River Site’s Salt Waste Processing Facility (SWPF) systems and training the workforce to operate the plant in preparation for the start of operations. Once in operation, the SWPF will significantly increase processing rates at SRS tank farms in an effort to empty the site’s high-level radioactive waste tanks.

  4. 48 CFR 852.237-70 - Contractor responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor....237-70 Contractor responsibilities. As prescribed in 837.110, insert the following clause: Contractor Responsibilities (APR 1984) The contractor shall obtain all necessary licenses and/or permits required to perform...

  5. 48 CFR 1509.170-8 - Contractor Performance Report.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor Performance... AGENCY ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-8 Contractor Performance Report. (a) Contractor Performance Reports (interim and final) must be prepared...

  6. 48 CFR 52.241-5 - Contractor's Facilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor's Facilities....241-5 Contractor's Facilities. As prescribed in 41.501(c)(4), insert a clause substantially the same as the following: Contractor's Facilities (FEB 1995) (a) The Contractor, at its expense, unless...

  7. 14 CFR 1245.108 - License to contractor.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false License to contractor. 1245.108 Section... INTELLECTUAL PROPERTY RIGHTS Patent Waiver Regulations § 1245.108 License to contractor. (a) Each contractor.... The license extends to the contractor's domestic subsidiaries and affiliates, if any, within the...

  8. 48 CFR 52.247-28 - Contractor's Invoices.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor's Invoices. 52....247-28 Contractor's Invoices. As prescribed in 47.207-9(c), insert the following clause in... services: Contractor's Invoices (APR 1984) The Contractor shall submit itemized invoices as instructed by...

  9. 48 CFR 33.207 - Contractor certification.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor certification... CONTRACTING REQUIREMENTS PROTESTS, DISPUTES, AND APPEALS Disputes and Appeals 33.207 Contractor certification. (a) Contractors shall provide the certification specified in paragraph (c) of this section when...

  10. 48 CFR 725.703 - Contractor employees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor employees. 725... SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Source, Origin, and Nationality 725.703 Contractor employees. (a... on employees or consultants of either contractors or subcontractors providing services under an USAID...

  11. Think Tanks, Education and Elite Policy Actors

    ERIC Educational Resources Information Center

    Savage, Glenn C.

    2016-01-01

    The past decade has seen think tanks operate in sophisticated ways to influence the development of education policies. In this paper, I reflect upon the influence of think tanks in the formation of national reform, using the Common Core State Standards initiative in the USA as an illustrative case. In doing so, I explore how certain think tanks,…

  12. 49 CFR 393.67 - Liquid fuel tanks.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... section. The rules in this section apply to tanks containing or supplying fuel for the operation of... leak more than a total of one ounce by weight of fuel per minute in any position the tank assumes...) Drop test—(i) Procedure. Fill the tank with a quantity of water having a weight equal to the weight of...

  13. Damage Tolerance Analysis of a Pressurized Liquid Oxygen Tank

    NASA Technical Reports Server (NTRS)

    Forth, Scott C.; Harvin, Stephen F.; Gregory, Peyton B.; Mason, Brian H.; Thompson, Joe E.; Hoffman, Eric K.

    2006-01-01

    A damage tolerance assessment was conducted of an 8,000 gallon pressurized Liquid Oxygen (LOX) tank. The LOX tank is constructed of a stainless steel pressure vessel enclosed by a thermal-insulating vacuum jacket. The vessel is pressurized to 2,250 psi with gaseous nitrogen resulting in both thermal and pressure stresses on the tank wall. Finite element analyses were performed on the tank to characterize the stresses from operation. Engineering material data was found from both the construction of the tank and the technical literature. An initial damage state was assumed based on records of a nondestructive inspection performed on the tank. The damage tolerance analyses were conducted using the NASGRO computer code. This paper contains the assumptions, and justifications, made for the input parameters to the damage tolerance analyses and the results of the damage tolerance analyses with a discussion on the operational safety of the LOX tank.

  14. Environmental Assessment: Waste Tank Safety Program, Hanford Site, Richland, Washington

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-02-01

    The US Department of Energy (DOE) needs to take action in the near-term, to accelerate resolution of waste tank safety issues at the Hanford Site near the City of Richland, Washington, and reduce the risks associated with operations and management of the waste tanks. The DOE has conducted nuclear waste management operations at the Hanford Site for nearly 50 years. Operations have included storage of high-level nuclear waste in 177 underground storage tanks (UST), both in single-shell tank (SST) and double-shell tank configurations. Many of the tanks, and the equipment needed to operate them, are deteriorated. Sixty-seven SSTs are presumedmore » to have leaked a total approximately 3,800,000 liters (1 million gallons) of radioactive waste to the soil. Safety issues associated with the waste have been identified, and include (1) flammable gas generation and episodic release; (2) ferrocyanide-containing wastes; (3) a floating organic solvent layer in Tank 241-C-103; (4) nuclear criticality; (5) toxic vapors; (6) infrastructure upgrades; and (7) interim stabilization of SSTs. Initial actions have been taken in all of these areas; however, much work remains before a full understanding of the tank waste behavior is achieved. The DOE needs to accelerate the resolution of tank safety concerns to reduce the risk of an unanticipated radioactive or chemical release to the environment, while continuing to manage the wastes safely.« less

  15. 30 CFR 46.12 - Responsibility for independent contractor training.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... EDUCATION AND TRAINING TRAINING AND RETRAINING OF MINERS ENGAGED IN SHELL DREDGING OR EMPLOYED AT SAND... Responsibility for independent contractor training. (a)(1) Each production-operator has primary responsibility... mine has primary responsibility for complying with §§ 46.3 through 46.10 of this part, including...

  16. 30 CFR 46.12 - Responsibility for independent contractor training.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... EDUCATION AND TRAINING TRAINING AND RETRAINING OF MINERS ENGAGED IN SHELL DREDGING OR EMPLOYED AT SAND... Responsibility for independent contractor training. (a)(1) Each production-operator has primary responsibility... mine has primary responsibility for complying with §§ 46.3 through 46.10 of this part, including...

  17. 30 CFR 46.12 - Responsibility for independent contractor training.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... EDUCATION AND TRAINING TRAINING AND RETRAINING OF MINERS ENGAGED IN SHELL DREDGING OR EMPLOYED AT SAND... Responsibility for independent contractor training. (a)(1) Each production-operator has primary responsibility... mine has primary responsibility for complying with §§ 46.3 through 46.10 of this part, including...

  18. 30 CFR 46.12 - Responsibility for independent contractor training.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... EDUCATION AND TRAINING TRAINING AND RETRAINING OF MINERS ENGAGED IN SHELL DREDGING OR EMPLOYED AT SAND... Responsibility for independent contractor training. (a)(1) Each production-operator has primary responsibility... mine has primary responsibility for complying with §§ 46.3 through 46.10 of this part, including...

  19. 48 CFR 1845.502-70 - Contractor-acquired property.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor-acquired... Possession of Contractors 1845.502-70 Contractor-acquired property. All contractor-acquired property must be... contractor-acquired. (2) Submission of DD Form 1419, DOD Industrial Plant Requisition, or equivalent format...

  20. Test plan for evaluating the operational performance of the prototype nested, fixed-depth fluidic sampler

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    REICH, F.R.

    The PHMC will provide Low Activity Wastes (LAW) tank wastes for final treatment by a privatization contractor from two double-shell feed tanks, 241-AP-102 and 241-AP-104. Concerns about the inability of the baseline ''grab'' sampling to provide large volume samples within time constraints has led to the development of a nested, fixed-depth sampling system. This sampling system will provide large volume, representative samples without the environmental, radiation exposure, and sample volume impacts of the current base-line ''grab'' sampling method. A plan has been developed for the cold testing of this nested, fixed-depth sampling system with simulant materials. The sampling system willmore » fill the 500-ml bottles and provide inner packaging to interface with the Hanford Sites cask shipping systems (PAS-1 and/or ''safe-send''). The sampling system will provide a waste stream that will be used for on-line, real-time measurements with an at-tank analysis system. The cold tests evaluate the performance and ability to provide samples that are representative of the tanks' content within a 95 percent confidence interval, to sample while mixing pumps are operating, to provide large sample volumes (1-15 liters) within a short time interval, to sample supernatant wastes with over 25 wt% solids content, to recover from precipitation- and settling-based plugging, and the potential to operate over the 20-year expected time span of the privatization contract.« less

  1. Tank atmosphere perturbation: a procedure for assessing flashing losses from oil storage tanks.

    PubMed

    Littlejohn, David; Lucas, Donald

    2003-03-01

    A new procedure to measure the total volume of emissions from heavy crude oil storage tanks is described. Tank flashing losses, which are difficult to measure, can be determined by correcting this value for working and breathing losses. The procedure uses a fan or blower to vent the headspace of the storage tank, with subsequent monitoring of the change in concentrations of oxygen or other gases. Combined with a separate determination of the reactive organic carbon (ROC) fraction in the gas, this method allows the evaluation of the total amount of ROC emitted. The operation of the system is described, and results from measurement of several storage tanks in California oil fields are presented. Our measurements are compared with those obtained using the California Air Resources Board (CARB) 150 method.

  2. 48 CFR 1252.242-71 - Contractor testimony.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor testimony. 1252... Contractor testimony. As prescribed in (TAR) 48 CFR 1242.7000(b), insert the following clause: Contractor Testimony (OCT 1994) All requests for the testimony of the Contractor or its employees, and any intention to...

  3. 24 CFR 242.53 - Excluded contractors.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Excluded contractors. 242.53... MORTGAGE INSURANCE FOR HOSPITALS Construction § 242.53 Excluded contractors. (a) Contracts relating to the... participation in federal programs, including but not limited to: A general contractor, a subcontractor, or...

  4. 14 CFR 121.316 - Fuel tanks.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Fuel tanks. 121.316 Section 121.316 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIR CARRIERS..., FLAG, AND SUPPLEMENTAL OPERATIONS Instrument and Equipment Requirements § 121.316 Fuel tanks. Each...

  5. 14 CFR 121.316 - Fuel tanks.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Fuel tanks. 121.316 Section 121.316 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIR CARRIERS..., FLAG, AND SUPPLEMENTAL OPERATIONS Instrument and Equipment Requirements § 121.316 Fuel tanks. Each...

  6. 14 CFR 121.316 - Fuel tanks.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Fuel tanks. 121.316 Section 121.316 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIR CARRIERS..., FLAG, AND SUPPLEMENTAL OPERATIONS Instrument and Equipment Requirements § 121.316 Fuel tanks. Each...

  7. 14 CFR 121.316 - Fuel tanks.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Fuel tanks. 121.316 Section 121.316 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIR CARRIERS..., FLAG, AND SUPPLEMENTAL OPERATIONS Instrument and Equipment Requirements § 121.316 Fuel tanks. Each...

  8. 14 CFR 121.316 - Fuel tanks.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Fuel tanks. 121.316 Section 121.316 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIR CARRIERS..., FLAG, AND SUPPLEMENTAL OPERATIONS Instrument and Equipment Requirements § 121.316 Fuel tanks. Each...

  9. 49 CFR 172.330 - Tank cars and multi-unit tank car tanks.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 2 2013-10-01 2013-10-01 false Tank cars and multi-unit tank car tanks. 172.330..., TRAINING REQUIREMENTS, AND SECURITY PLANS Marking § 172.330 Tank cars and multi-unit tank car tanks. (a... material— (1) In a tank car unless the following conditions are met: (i) The tank car must be marked on...

  10. 49 CFR 172.330 - Tank cars and multi-unit tank car tanks.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 2 2012-10-01 2012-10-01 false Tank cars and multi-unit tank car tanks. 172.330..., TRAINING REQUIREMENTS, AND SECURITY PLANS Marking § 172.330 Tank cars and multi-unit tank car tanks. (a... material— (1) In a tank car unless the following conditions are met: (i) The tank car must be marked on...

  11. 49 CFR 172.330 - Tank cars and multi-unit tank car tanks.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 2 2014-10-01 2014-10-01 false Tank cars and multi-unit tank car tanks. 172.330..., TRAINING REQUIREMENTS, AND SECURITY PLANS Marking § 172.330 Tank cars and multi-unit tank car tanks. (a... material— (1) In a tank car unless the following conditions are met: (i) The tank car must be marked on...

  12. A Rinsing Effluent Evaporator for Dismantling Operations - 13271

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rives, Rachel; Asou-Pothet, Marielle; Chambon, Frederic

    2013-07-01

    Between 1958 and 1997, the UP1 plant at Marcoule - located in the south of France - reprocessed and recycled nearly 20,000 MT of used fuel from special defense applications reactors, as well as fuel from the first generation of electricity generating reactors in France (natural uranium fuel, CO{sub 2}-cooled, graphite-moderated). Decommissioning and Dismantling of the UP1 plant and its associated units started in 1998. Since 2005, the UP1 facility has been operated by AREVA as the Marcoule Management and Operation contractor for French Atomic Energy Commission (CEA). An important part of this decommissioning program deals with the vitrification facilitymore » of Marcoule. This facility includes 20 tanks devoted to interim storage of highly active solutions, prior to vitrification. In 2006, a rinsing program was defined as part of the tank cleanup strategy. The main objective of the rinsing phases was to decrease activity in order to limit the volume of 'long-life active' waste produced during the decommissioning operations, so the tanks can be dismantled without the need of remote operations. To enable this rinsing program, and anticipating large volumes of generated effluent, the construction of an evaporation unit proved to be essential. The main objective of this unit was to concentrate the effluent produced during tank rinsing operations by a factor of approximately 10, prior to it being treated by vitrification. The evaporator design phase was launched in September 2006. The main challenge for the Project team was the installation of this new unit within a nuclear facility still in operation and in existing compartments not initially designed for this purpose. Cold operating tests were completed in 2008, and in May 2009, the final connections to the process were activated to start the hot test phase. During the first hot test operations performed on the first batches of clean-up effluent, the evaporator had a major operating problem. Extremely large

  13. 40 CFR 35.6600 - Contractor claims.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contractor claims. 35.6600 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6600 Contractor claims. (a) General... prepared by the contractor to support a claim against the recipient; and (4) The award official determines...

  14. 23 CFR 635.110 - Licensing and qualification of contractors.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.110 Licensing and qualification... licensing contractors, who may bid for, be awarded, or perform Federal-aid highway contracts, shall be... of a bid or before the bid may be considered for award of a contract. This, however, is not intended...

  15. 49 CFR 174.63 - Portable tanks, IM portable tanks, IBCs, Large Packagings, cargo tanks, and multi-unit tank car...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 2 2014-10-01 2014-10-01 false Portable tanks, IM portable tanks, IBCs, Large Packagings, cargo tanks, and multi-unit tank car tanks. 174.63 Section 174.63 Transportation Other....63 Portable tanks, IM portable tanks, IBCs, Large Packagings, cargo tanks, and multi-unit tank car...

  16. 49 CFR 174.63 - Portable tanks, IM portable tanks, IBCs, Large Packagings, cargo tanks, and multi-unit tank car...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 2 2010-10-01 2010-10-01 false Portable tanks, IM portable tanks, IBCs, Large Packagings, cargo tanks, and multi-unit tank car tanks. 174.63 Section 174.63 Transportation Other....63 Portable tanks, IM portable tanks, IBCs, Large Packagings, cargo tanks, and multi-unit tank car...

  17. 49 CFR 174.63 - Portable tanks, IM portable tanks, IBCs, Large Packagings, cargo tanks, and multi-unit tank car...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 2 2011-10-01 2011-10-01 false Portable tanks, IM portable tanks, IBCs, Large Packagings, cargo tanks, and multi-unit tank car tanks. 174.63 Section 174.63 Transportation Other....63 Portable tanks, IM portable tanks, IBCs, Large Packagings, cargo tanks, and multi-unit tank car...

  18. 49 CFR 174.63 - Portable tanks, IM portable tanks, IBCs, Large Packagings, cargo tanks, and multi-unit tank car...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 2 2013-10-01 2013-10-01 false Portable tanks, IM portable tanks, IBCs, Large Packagings, cargo tanks, and multi-unit tank car tanks. 174.63 Section 174.63 Transportation Other....63 Portable tanks, IM portable tanks, IBCs, Large Packagings, cargo tanks, and multi-unit tank car...

  19. 49 CFR 174.63 - Portable tanks, IM portable tanks, IBCs, Large Packagings, cargo tanks, and multi-unit tank car...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 2 2012-10-01 2012-10-01 false Portable tanks, IM portable tanks, IBCs, Large Packagings, cargo tanks, and multi-unit tank car tanks. 174.63 Section 174.63 Transportation Other....63 Portable tanks, IM portable tanks, IBCs, Large Packagings, cargo tanks, and multi-unit tank car...

  20. 29 CFR 500.41 - Farm labor contractor is responsible for actions of his farm labor contractor employee.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., prior to such employee's engagement in any activity enumerated in section 3(6) of the Act. A farm labor... farm labor contractor employee. 500.41 Section 500.41 Labor Regulations Relating to Labor (Continued... PROTECTION Registration of Farm Labor Contractors and Employees of Farm Labor Contractors Engaged in Farm...

  1. 29 CFR 500.41 - Farm labor contractor is responsible for actions of his farm labor contractor employee.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., prior to such employee's engagement in any activity enumerated in section 3(6) of the Act. A farm labor... farm labor contractor employee. 500.41 Section 500.41 Labor Regulations Relating to Labor (Continued... PROTECTION Registration of Farm Labor Contractors and Employees of Farm Labor Contractors Engaged in Farm...

  2. Radioactive air emissions notice of construction for installation and operation of a waste retrieval system and tanks 241-AP-102 and 241-AP-104 project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DEXTER, M.L.

    1999-11-15

    This document serves as a notice of construction (NOC) pursuant to the requirements of Washington Administrative Code (WAC) 246 247-060, and as a request for approval to modify pursuant to 40 Code of Federal Regulations (CFR) 61 07 for the installation and operation of one waste retrieval system in the 24 1 AP-102 Tank and one waste retrieval system in the 241 AP 104 Tank Pursuant to 40 CFR 61 09 (a)( 1) this application is also intended to provide anticipated initial start up notification Its is requested that EPA approval of this application will also constitute EPA acceptance ofmore » the initial start up notification Project W 211 Initial Tank Retrieval Systems (ITRS) is scoped to install a waste retrieval system in the following double-shell tanks 241-AP 102-AP 104 AN 102, AN 103, AN-104, AN 105, AY 102 AZ 102 and SY-102 between now and the year 2011. Because of the extended installation schedules and unknowns about specific activities/designs at each tank, it was decided to submit NOCs as that information became available This NOC covers the installation and operation of a waste retrieval system in tanks 241 AP-102 and 241 AP 104 Generally this includes removal of existing equipment installation of new equipment and construction of new ancillary equipment and buildings Tanks 241 AP 102 and 241 AP 104 will provide waste feed for immobilization into a low activity waste (LAW) product (i.e. glass logs) The total effective dose equivalent (TEDE) to the offsite maximally exposed individual (MEI) from the construction activities is 0 045 millirem per year The unabated TEDE to the offsite ME1 from operation of the mixer pumps is 0 042 millirem per year.« less

  3. 48 CFR 970.0371-7 - Outside employment of contractor employees.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Outside employment of contractor employees. 970.0371-7 Section 970.0371-7 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business...

  4. 45 CFR 5b.12 - Contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Contractors. 5b.12 Section 5b.12 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION PRIVACY ACT REGULATIONS § 5b.12 Contractors. (a) All contracts entered into on or after September 27, 1975 which require a contractor to maintain...

  5. 40 CFR 264.1084 - Standards: Tanks.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... internal floating roof in accordance with the requirements specified in paragraph (e) of this section; (2) A tank equipped with an external floating roof in accordance with the requirements specified in... operator who controls air pollutant emissions from a tank using a fixed roof with an internal floating roof...

  6. Results Of Routine Strip Effluent Hold Tank, Decontaminated Salt Solution Hold Tank, Caustic Wash Tank And Caustic Storage Tank Samples From Modular Caustic-Side Solvent Extraction Unit During Macrobatch 6 Operations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peters, T. B.

    Strip Effluent Hold Tank (SEHT), Decontaminated Salt Solution Hold Tank (DSSHT), Caustic Wash Tank (CWT) and Caustic Storage Tank (CST) samples from the Interim Salt Disposition Project (ISDP) Salt Batch (“Macrobatch”) 6 have been analyzed for 238Pu, 90Sr, 137Cs, and by Inductively Coupled Plasma Emission Spectroscopy (ICPES). The Pu, Sr, and Cs results from the current Macrobatch 6 samples are similar to those from comparable samples in previous Macrobatch 5. In addition the SEHT and DSSHT heel samples (i.e. ‘preliminary’) have been analyzed and reported to meet NGS Demonstration Plan requirements. From a bulk chemical point of view, the ICPESmore » results do not vary considerably between this and the previous samples. The titanium results in the DSSHT samples continue to indicate the presence of Ti, when the feed material does not have detectable levels. This most likely indicates that leaching of Ti from MST has increased in ARP at the higher free hydroxide concentrations in the current feed.« less

  7. 34 CFR 5b.12 - Contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false Contractors. 5b.12 Section 5b.12 Education Office of the Secretary, Department of Education PRIVACY ACT REGULATIONS § 5b.12 Contractors. (a) All contracts entered into on or after September 27, 1975 which require a contractor to maintain or on behalf of the...

  8. Enumeration and Characterization of Acidophilic Microorganisms Isolated from a Pilot Plant Stirred-Tank Bioleaching Operation

    PubMed Central

    Okibe, Naoko; Gericke, Mariekie; Hallberg, Kevin B.; Johnson, D. Barrie

    2003-01-01

    Microorganisms were enumerated and isolated on selective solid media from a pilot-scale stirred-tank bioleaching operation in which a polymetallic sulfide concentrate was subjected to biologically accelerated oxidation at 45°C. Four distinct prokaryotes were isolated: three bacteria (an Acidithiobacillus caldus-like organism, a thermophilic Leptospirillum sp., and a Sulfobacillus sp.) and one archaeon (a Ferroplasma-like isolate). The relative numbers of these prokaryotes changed in the three reactors sampled, and the Ferroplasma isolate became increasingly dominant as mineral oxidation progressed, eventually accounting for >99% of plate isolates in the third of three in-line reactors. The identities of the isolates were confirmed by analyses of their 16S rRNA genes, and some key physiological traits (e.g., oxidation of iron and/or sulfur and autotrophy or heterotrophy) were examined. More detailed studies were carried out with the Leptospirillum and Ferroplasma isolates. The data presented here represent the first quantitative study of the microorganisms in a metal leaching situation and confirm that mixed cultures of iron- and sulfur-oxidizing prokaryotic acidophiles catalyze the accelerated dissolution of sulfidic minerals in industrial tank bioleaching operations. The results show that indigenous acidophilic microbial populations change as mineral dissolution becomes more extensive. PMID:12676667

  9. Small-Scale Surface (Tank) Irrigation in Asia

    NASA Astrophysics Data System (ADS)

    Palanisami, K.; Easter, K. William

    1987-05-01

    Tank irrigation is an ancient tradition in Asia which is now being reviewed as a potential model for future irrigation expansion. South India has thousands of tanks which are in need of rehabilitation after being in operation for over a century. This study evaluates tank irrigation in an area of south India which has the greatest concentration of tanks. Constraints and unique characteristics of tank irrigation are analyzed to provide a basis for devising strategies for improving tank irrigation. A combination of public and private investments along with institutional changes are recommended to help farmers organize to improve irrigation. Yet, only if public investment is carefully integrated with existing private efforts will farmers have incentives to maintain the irrigation systems.

  10. 48 CFR 51.104 - Furnishing assistance to contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contractors. 51.104 Section 51.104 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT USE OF GOVERNMENT SOURCES BY CONTRACTORS Contractor Use of Government Supply Sources 51.104 Furnishing assistance to contractors. After receiving an activity address code, the contracting...

  11. 48 CFR 52.246-1 - Contractor Inspection Requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor Inspection....246-1 Contractor Inspection Requirements. As prescribed in 46.301, insert the following clause: Contractor Inspection Requirements (APR 1984) The Contractor is responsible for performing or having...

  12. 30 CFR 45.3 - Identification of independent contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Identification of independent contractors. 45.3... ADMINISTRATIVE REQUIREMENTS INDEPENDENT CONTRACTORS § 45.3 Identification of independent contractors. (a) Any independent contractor may obtain a permanent MSHA identification number. To obtain an identification number...

  13. 48 CFR 52.204-7 - Central Contractor Registration.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Central Contractor....204-7 Central Contractor Registration. As prescribed in 4.1105, use the following clause: Central Contractor Registration (APR 2008) (a) Definitions. As used in this clause— Central Contractor Registration...

  14. 48 CFR 970.4402-3 - Purchasing from contractor-affiliated sources.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... the entities are separately incorporated. (b) Subcontracts for performance of contract work itself (as distinguished from the purchase of supplies and services needed in connection with the performance of work... and operating contractor seeks authorization to have some part of the contract work performed by a...

  15. Enhancement of a UASB-septic tank performance for decentralised treatment of strong domestic sewage.

    PubMed

    Mahmoud, Nidal; van Lier, Jules B

    2011-01-01

    The possibility of enhancing the process performance of the UASB-septic tank for treating strong sewage in Palestine by means of inoculating the reactor with well adapted anaerobic sludge and/or adding a packing media to the upper part of the reactor, creating an anaerobic hybrid (AH)-septic tank, was investigated. To achieve these objectives, two community onsite UASB-septic tank and AH-septic tank were operated in parallel at 2 days HRT for around 8 months overlapping the cold and hot periods of the year in Palestine. The achieved removal efficiencies of CODtot in the UASB-septic tank and AH-septic tank during the first months of operation, coinciding with the cold period and the subsequent hot period, were respectively 50 (+/- 15)% and 48 (+/- 15)% and 66 (+/- 8)% and 55 (+/- 8)%. This shows that the UASB-septic tank performed significantly better (p < 0.05) than the AH-septic tank after rather long periods of operation. The difference in the CODtot removal efficiency was mainly due to the better CODss removal efficiencies in the UASB-septic tank. The removal efficiencies over the last 50 days of operation for CODtot, CODsus, CODcol and CODdis were 70, 72, 77 and 55% and 53, 54, 78 and 45% for the UASB-septic tank and AH-septic tank, respectively. Comparing the here achieved COD removal efficiencies with previously reported efficiencies of UASB-septic tanks operated in Palestine shows that the reactor performance in terms of COD removal and conversion, during the first 8 months of operation, has improved substantially by being started with well adapted anaerobic sludge, simulating and predicting long-term performance. Adding packing media did not lead to an improvement.

  16. 48 CFR 242.7000 - Contractor business system deficiencies.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Contractor business system... Business Systems 242.7000 Contractor business system deficiencies. (a) Definitions. As used in this subpart— Acceptable contractor business systems and contractor business systems are defined in the clause at 252.242...

  17. 48 CFR 242.7000 - Contractor business system deficiencies.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Contractor business system... Business Systems 242.7000 Contractor business system deficiencies. (a) Definitions. As used in this subpart— Acceptable contractor business systems and contractor business systems are defined in the clause at 252.242...

  18. 48 CFR 242.7000 - Contractor business system deficiencies.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Contractor business system... BUSINESS SYSTEMS 242.7000 Contractor business system deficiencies. (a) Definitions. As used in this subpart— Acceptable contractor business systems and contractor business systems are defined in the clause at 252.242...

  19. 48 CFR 242.7000 - Contractor business system deficiencies.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Contractor business system... BUSINESS SYSTEMS 242.7000 Contractor business system deficiencies. (a) Definitions. As used in this subpart— Acceptable contractor business systems and contractor business systems are defined in the clause at 252.242...

  20. 48 CFR 1552.237-76 - Government-Contractor Relations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Government-Contractor... 1552.237-76 Government-Contractor Relations. As prescribed in 1537.110(g), insert the following clause: Government-Contractor Relations (JUN 1999) (a) The Government and the Contractor understand and agree that...

  1. 48 CFR 1552.237-76 - Government-Contractor Relations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Government-Contractor... 1552.237-76 Government-Contractor Relations. As prescribed in 1537.110(g), insert the following clause: Government-Contractor Relations (JUN 1999) (a) The Government and the Contractor understand and agree that...

  2. 48 CFR 1552.237-76 - Government-Contractor Relations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Government-Contractor... 1552.237-76 Government-Contractor Relations. As prescribed in 1537.110(g), insert the following clause: Government-Contractor Relations (JUN 1999) (a) The Government and the Contractor understand and agree that...

  3. 48 CFR 42.402 - Visits to contractors' facilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Visits to contractors... contractors' facilities. (a) Government personnel planning to visit a contractor's facility in connection with... positions, and security clearances. (2) Date and duration of visit. (3) Name and address of contractor and...

  4. Tank characterization report for double-shell tank 241-AW-105

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sasaki, L.M.

    1997-06-05

    One of the major functions of the Tank Waste Remediation System (TWRS) is to characterize wastes in support of waste management and disposal activities at the Hanford Site. Analytical data from sampling and analysis, along with other available information about a tank, are compiled and maintained in a tank characterization report (TCR). This report and its appendices serve as the TCR for double-shell tank 241-AW-105. The objectives of this report are to use characterization data in response to technical issues associated with tank 241-AW-105 waste; and to provide a standard characterization of this waste in terms of a best-basis inventorymore » estimate. The response to technical issues is summarized in Section 2.0, and the best-basis inventory estimate is presented in Section 3.0. Recommendations regarding safety status and additional sampling needs are provided in Section 4.0. Supporting data and information are contained in the appendices. This report supports the requirements of the Hanford Federal Facility Agreement and Consent Order milestone Characterization. information presented in this report originated from sample analyses and known historical sources. While only the results of a recent sampling event will be used to fulfill the requirements of the data quality objectives (DQOs), other information can be used to support or question conclusions derived from these results. Historical information for tank 241-AW-105 is provided in Appendix A, including surveillance information, records pertaining to waste transfers and tank operations, and expected tank contents derived from a process knowledge model. The recent sampling event listed, as well as pertinent sample data obtained before 1996, are summarized in Appendix B along with the sampling results. The results of the 1996 grab sampling event satisfied the data requirements specified in the sampling and analysis plan (SAP) for this tank. In addition, the tank headspace flammability was measured, which

  5. SRS SWPF Construction Completion

    ScienceCinema

    Craig, Jack; Sheppard, Frank; Marks, Pam

    2018-01-16

    Now that construction is complete, DOE and construction contractor Parsons, are focusing on testing the Savannah River Site’s Salt Waste Processing Facility (SWPF) systems and training the workforce to operate the plant in preparation for the start of operations. Once in operation, the SWPF will significantly increase processing rates at SRS tank farms in an effort to empty the site’s high-level radioactive waste tanks.

  6. 41 CFR 109-38.301-1 - Contractors' use.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Contractors' use. 109-38...-38.301-1 Contractors' use. Heads of field organizations shall ensure that provisions of the FPMR concerning contractor use of Government motor vehicles are complied with by their designated contractors. ...

  7. 48 CFR 47.207-5 - Contractor responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ....207-5 Contractor responsibilities. Contractor responsibilities vary with the kinds of freight to be shipped and services required. The contracting officer shall specify clearly those service requirements... freight. The contracting officer shall insert the clause at 52.247-16, Contractor Responsibility for...

  8. 48 CFR 47.207-5 - Contractor responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ....207-5 Contractor responsibilities. Contractor responsibilities vary with the kinds of freight to be shipped and services required. The contracting officer shall specify clearly those service requirements... freight. The contracting officer shall insert the clause at 52.247-16, Contractor Responsibility for...

  9. 48 CFR 47.207-5 - Contractor responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ....207-5 Contractor responsibilities. Contractor responsibilities vary with the kinds of freight to be shipped and services required. The contracting officer shall specify clearly those service requirements... freight. The contracting officer shall insert the clause at 52.247-16, Contractor Responsibility for...

  10. 48 CFR 47.207-5 - Contractor responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ....207-5 Contractor responsibilities. Contractor responsibilities vary with the kinds of freight to be shipped and services required. The contracting officer shall specify clearly those service requirements... freight. The contracting officer shall insert the clause at 52.247-16, Contractor Responsibility for...

  11. 48 CFR 450.303-1 - Contractor requests.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Contractor requests. 450.303-1 Section 450.303-1 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE CONTRACT MANAGEMENT EXTRAORDINARY CONTRACTUAL ACTIONS Contract Adjustments 450.303-1 Contractor requests. Contractor...

  12. 78 FR 11164 - Policy on Contractor Profits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-15

    ... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System Policy on Contractor Profits AGENCY... Authorization Act for Fiscal Year 2013. Section 804, Department of Defense Policy on Contractor Profits... modifications to such guidelines that are necessary to ensure an appropriate link between contractor profit and...

  13. 48 CFR 46.301 - Contractor inspection requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor inspection... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.301 Contractor inspection requirements. The contracting officer shall insert the clause at 52.246-1, Contractor Inspection Requirements, in solicitations...

  14. RECOMMENDATIONS FOR SAMPLING OF TANK 19 IN F TANK FARM

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harris, S.; Shine, G.

    2009-12-14

    Representative sampling is required for characterization of the residual material in Tank 19 prior to operational closure. Tank 19 is a Type IV underground waste storage tank located in the F-Tank Farm. It is a cylindrical-shaped, carbon steel tank with a diameter of 85 feet, a height of 34.25 feet, and a working capacity of 1.3 million gallons. Tank 19 was placed in service in 1961 and initially received a small amount of low heat waste from Tank 17. It then served as an evaporator concentrate (saltcake) receiver from February 1962 to September 1976. Tank 19 also received the spentmore » zeolite ion exchange media from a cesium removal column that once operated in the Northeast riser of the tank to remove cesium from the evaporator overheads. Recent mechanical cleaning of the tank removed all mounds of material. Anticipating a low level of solids in the residual waste, Huff and Thaxton [2009] developed a plan to sample the waste during the final clean-up process while it would still be resident in sufficient quantities to support analytical determinations in four quadrants of the tank. Execution of the plan produced fewer solids than expected to support analytical determinations in all four quadrants. Huff and Thaxton [2009] then restructured the plan to characterize the residual separately in the North and the South regions: two 'hemispheres.' This document provides sampling recommendations to complete the characterization of the residual material on the tank bottom following the guidance in Huff and Thaxton [2009] to split the tank floor into a North and a South hemisphere. The number of samples is determined from a modification of the formula previously published in Edwards [2001] and the sample characterization data for previous sampling of Tank 19 described by Oji [2009]. The uncertainty is quantified by an upper 95% confidence limit (UCL95%) on each analyte's mean concentration in Tank 19. The procedure computes the uncertainty in analyte concentration as

  15. 48 CFR 2427.305-2 - Follow-up by contractor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Follow-up by contractor....305-2 Follow-up by contractor. (b) Contractor reports. Contractors shall complete and submit to the... Contracting Officer shall send the form to those contractors whose contract work may have required the...

  16. 14 CFR 1245.108 - License to contractor.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true License to contractor. 1245.108 Section 1245.108 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION PATENTS AND OTHER INTELLECTUAL PROPERTY RIGHTS Patent Waiver Regulations § 1245.108 License to contractor. (a) Each contractor reporting...

  17. 6 CFR 25.8 - Government contractor Defense.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 6 Domestic Security 1 2012-01-01 2012-01-01 false Government contractor Defense. 25.8 Section 25.8...-TERRORISM BY FOSTERING EFFECTIVE TECHNOLOGIES § 25.8 Government contractor Defense. (a) Criteria for... applicability of the government contractor defense. In determining whether to issue such Certification, the...

  18. 6 CFR 25.8 - Government contractor Defense.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 6 Domestic Security 1 2013-01-01 2013-01-01 false Government contractor Defense. 25.8 Section 25.8...-TERRORISM BY FOSTERING EFFECTIVE TECHNOLOGIES § 25.8 Government contractor Defense. (a) Criteria for... applicability of the government contractor defense. In determining whether to issue such Certification, the...

  19. 32 CFR 989.23 - Contractor prepared documents.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Contractor prepared documents. 989.23 Section... PROTECTION ENVIRONMENTAL IMPACT ANALYSIS PROCESS (EIAP) § 989.23 Contractor prepared documents. All Air Force... should reflect on the cover sheet they are an Air Force document. Contractor preparation information...

  20. 6 CFR 25.8 - Government contractor Defense.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 6 Domestic Security 1 2010-01-01 2010-01-01 false Government contractor Defense. 25.8 Section 25.8...-TERRORISM BY FOSTERING EFFECTIVE TECHNOLOGIES § 25.8 Government contractor Defense. (a) Criteria for... applicability of the government contractor defense. In determining whether to issue such Certification, the...

  1. 40 CFR 68.87 - Contractors.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.87 Contractors. (a) Application. This... known potential fire, explosion, or toxic release hazards related to the contractor's work and the... instructed in the known potential fire, explosion, or toxic release hazards related to his/her job and the...

  2. 40 CFR 68.87 - Contractors.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.87 Contractors. (a) Application. This... known potential fire, explosion, or toxic release hazards related to the contractor's work and the... instructed in the known potential fire, explosion, or toxic release hazards related to his/her job and the...

  3. 40 CFR 68.87 - Contractors.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.87 Contractors. (a) Application. This... known potential fire, explosion, or toxic release hazards related to the contractor's work and the... instructed in the known potential fire, explosion, or toxic release hazards related to his/her job and the...

  4. 40 CFR 68.87 - Contractors.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.87 Contractors. (a) Application. This... known potential fire, explosion, or toxic release hazards related to the contractor's work and the... instructed in the known potential fire, explosion, or toxic release hazards related to his/her job and the...

  5. TRICARE Managed Care Support Contractor Program Integrity Units Met Contract Requirements

    DTIC Science & Technology

    2012-12-05

    these contractors because they represented 52 percent of purchased care claims paid in 20 ll for TRICARE beneficiaries. We did not review the dental ...5 (!ru-L..!J(It~ t’J Alice F. Carey Assistant Inspector General Readiness, Operations, and Support

  6. 42 CFR 455.202 - Limitation on contractor liability.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Limitation on contractor liability. 455.202 Section... § 455.202 Limitation on contractor liability. (a) A program contractor, a person, or an entity employed... contractor will not be held to have violated any criminal law and will not be held liable in any civil action...

  7. 49 CFR 173.318 - Cryogenic liquids in cargo tanks.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ....338-15). (3) The jacket covering the insulation on a tank used to transport a cryogenic liquid must be... devices for piping hose and vacuum-insulated jackets. (i) Each portion of connected liquid piping or hose... tank, piping, or operating personnel. (ii) On a vacuum-insulated cargo tank the jacket must be...

  8. Vented Chill / No-Vent Fill of Cryogenic Propellant Tanks

    NASA Technical Reports Server (NTRS)

    Rhys, Noah O.; Foster, Lee W.; Martin, Adam K.; Stephens, Jonathan R.

    2016-01-01

    Architectures for extended duration missions often include an on-orbit replenishment of the space vehicle's cryogenic liquid propellants. Such a replenishment could be accomplished via a tank-to-tank transfer from a dedicated tanker or a more permanent propellant depot storage tank. Minimizing the propellant loss associated with transfer line and receiver propellant tank thermal conditioning is essential for mass savings. A new methodology for conducting tank-to-tank transfer while minimizing such losses has been demonstrated. Charge-Hold-Vent is the traditional methodology for conducting a tank-to-tank propellant transfer. A small amount of cryogenic liquid is introduced to chill the transfer line and propellant tank. As the propellant absorbs heat and undergoes a phase change, the tank internal pressure increases. The tank is then vented to relieve pressure prior to another charge of cryogenic liquid being introduced. This cycle is repeated until the transfer lines and tank are sufficiently chilled and the replenishment of the propellant tank is complete. This method suffers inefficiencies due to multiple chill and vent cycles within the transfer lines and associated feed system components. Additionally, this system requires precise measuring of cryogenic fluid delivery for each transfer, multiple valve cycling events, and other complexities associated with cycled operations. To minimize propellant loss and greatly simplify on-orbit operations, an alternate methodology has been designed and demonstrated. The Vented Chill / No Vent Fill method is a simpler, constant flow approach in which the propellant tank and transfer lines are only chilled once. The receiver tank is continuously vented as cryogenic liquid chills the transfer lines, tank mass and ullage space. Once chilled sufficiently, the receiver tank valve is closed and the tank is completely filled. Interestingly, the vent valve can be closed prior to receiver tank components reaching liquid saturation

  9. Developing NDE Techniques for Large Cryogenic Tanks

    NASA Technical Reports Server (NTRS)

    Parker, Don; Starr, Stan

    2009-01-01

    The Shuttle and Constellation Programs require very large cryogenic ground storage tanks in which to store liquid oxygen and hydrogen. The existing LC-39 pad tanks, which will be passed onto Constellation, are 40 years old and have received minimal refurbishment or even inspection, because they can only be temperature cycled a few times before being overhauled (a costly operation in both time and dollars). Numerous questions exist on the performance and reliability of these old tanks which could cause a major Program schedule disruption. Consequently, with the passing of the first two tanks to Constellation to occur this year, there is growing awareness that NDE is needed to detect problems early in these tanks so that corrective actions can be scheduled when least disruptive. Time series thermal images of two sides of the Pad B LH2 tank have been taken over multiple days to demonstrate the effects of environmental conditions to the solar heating of the tank and therefore the effectiveness of thermal imaging.

  10. 10 CFR 436.32 - Qualified contractors lists.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Qualified contractors lists. 436.32 Section 436.32 Energy... Procedures for Energy Savings Performance Contracting § 436.32 Qualified contractors lists. (a) DOE shall... energy savings performance contracts. (c) DOE may remove a firm from DOE's list of qualified contractors...

  11. 21 CFR 21.30 - Records of contractors.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 1 2010-04-01 2010-04-01 false Records of contractors. 21.30 Section 21.30 Food... PRIVACY Requirements for Specific Categories of Records § 21.30 Records of contractors. (a) Systems of... contractors to accomplish Food and Drug Administration functions, from which information is retrieved by...

  12. 21 CFR 20.90 - Disclosure to contractors.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 1 2010-04-01 2010-04-01 false Disclosure to contractors. 20.90 Section 20.90... INFORMATION Limitations on Exemptions § 20.90 Disclosure to contractors. (a) Data and information otherwise exempt from public disclosure may be disclosed to contractors with the Food and Drug Administration and...

  13. Runtime and Pressurization Analyses of Propellant Tanks

    NASA Technical Reports Server (NTRS)

    Field, Robert E.; Ryan, Harry M.; Ahuja, Vineet; Hosangadi, Ashvin; Lee, Chung P.

    2007-01-01

    Multi-element unstructured CFD has been utilized at NASA SSC to carry out analyses of propellant tank systems in different modes of operation. The three regimes of interest at SSC include (a) tank chill down (b) tank pressurization and (c) runtime propellant draw-down and purge. While tank chill down is an important event that is best addressed with long time-scale heat transfer calculations, CFD can play a critical role in the tank pressurization and runtime modes of operation. In these situations, problems with contamination of the propellant by inclusion of the pressurant gas from the ullage causes a deterioration of the quality of the propellant delivered to the test article. CFD can be used to help quantify the mixing and propellant degradation. During tank pressurization under some circumstances, rapid mixing of relatively warm pressurant gas with cryogenic propellant can lead to rapid densification of the gas and loss of pressure in the tank. This phenomenon can cause serious problems during testing because of the resulting decrease in propellant flow rate. With proper physical models implemented, CFD can model the coupling between the propellant and pressurant including heat transfer and phase change effects and accurately capture the complex physics in the evolving flowfields. This holds the promise of allowing the specification of operational conditions and procedures that could minimize the undesirable mixing and heat transfer inherent in propellant tank operation. It should be noted that traditional CFD modeling is inadequate for such simulations because the fluids in the tank are in a range of different sub-critical and supercritical states and elaborate phase change and mixing rules have to be developed to accurately model the interaction between the ullage gas and the propellant. We show a typical run-time simulation of a spherical propellant tank, containing RP-1 in this case, being pressurized with room-temperature nitrogen at 540 R. Nitrogen

  14. 48 CFR 1552.237-76 - Government-Contractor Relations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...: Government-Contractor Relations (JUN 1999) (a) The Government and the Contractor understand and agree that... event the notice is inadequate to make a decision, advise the Contractor what additional information is...

  15. 48 CFR 1552.237-76 - Government-Contractor Relations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...: Government-Contractor Relations (JUN 1999) (a) The Government and the Contractor understand and agree that... event the notice is inadequate to make a decision, advise the Contractor what additional information is...

  16. CEMENTITIOUS GROUT FOR CLOSING SRS HIGH LEVEL WASTE TANKS - #12315

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Langton, C.; Burns, H.; Stefanko, D.

    2012-01-10

    In 1997, the first two United States Department of Energy (US DOE) high level waste tanks (Tanks 17-F and 20-F: Type IV, single shell tanks) were taken out of service (permanently closed) at the Savannah River Site (SRS). In 2012, the DOE plans to remove from service two additional Savannah River Site (SRS) Type IV high-level waste tanks, Tanks 18-F and 19-F. These tanks were constructed in the late 1950's and received low-heat waste and do not contain cooling coils. Operational closure of Tanks 18-F and 19-F is intended to be consistent with the applicable requirements of the Resource Conservationmore » and Recovery Act (RCRA) and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and will be performed in accordance with South Carolina Department of Health and Environmental Control (SCDHEC). The closure will physically stabilize two 4.92E+04 cubic meter (1.3 E+06 gallon) carbon steel tanks and isolate and stabilize any residual contaminants left in the tanks. The closure will also fill, physically stabilize and isolate ancillary equipment abandoned in the tanks. A Performance Assessment (PA) has been developed to assess the long-term fate and transport of residual contamination in the environment resulting from the operational closure of the F-Area Tank Farm (FTF) waste tanks. Next generation flowable, zero-bleed cementitious grouts were designed, tested, and specified for closing Tanks 18-F and 19-F and for filling the abandoned equipment. Fill requirements were developed for both the tank and equipment grouts. All grout formulations were required to be alkaline with a pH of 12.4 and chemically reduction potential (Eh) of -200 to -400 to stabilize selected potential contaminants of concern. This was achieved by including Portland cement and Grade 100 slag in the mixes, respectively. Ingredients and proportions of cementitious reagents were selected and adjusted, respectively, to support the mass placement strategy developed by

  17. General practitioners and the independent contractor status

    PubMed Central

    Gray, D. J. Pereira

    1977-01-01

    Primary medical care can be provided either by a bureaucratic hierarchical organization or alternatively by independent contractors. Most members of the caring professions in medicine, nursing, and social work are employed in bureaucracies, whereas general medical practitioners, general dental practitioners, opticians, and pharmacists are independent contractors. The independent contractor status has recently been heavily attacked from within the medical and nursing professions, and also from outside. It has been suggested that contracting for services is an inappropriate and anomalous way of arranging medical care, which should now be stopped. However, this process of contracting for services can be analysed, using perspectives from some of the behavioural sciences, to reveal hidden depths in the independent contractor status which suggest that the provision of primary medical care is best carried out by independent contractors. PMID:616865

  18. 46 CFR 98.30-9 - Stowage of portable tanks.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Stowage of portable tanks. 98.30-9 Section 98.30-9... CONSTRUCTION, ARRANGEMENT, AND OTHER PROVISIONS FOR CERTAIN DANGEROUS CARGOES IN BULK Portable Tanks § 98.30-9 Stowage of portable tanks. (a) No person may operate a vessel to which this subpart applies unless each...

  19. 46 CFR 98.30-9 - Stowage of portable tanks.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Stowage of portable tanks. 98.30-9 Section 98.30-9... CONSTRUCTION, ARRANGEMENT, AND OTHER PROVISIONS FOR CERTAIN DANGEROUS CARGOES IN BULK Portable Tanks § 98.30-9 Stowage of portable tanks. (a) No person may operate a vessel to which this subpart applies unless each...

  20. Alternatives Generation and Analysis for Heat Removal from High Level Waste Tanks

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    WILLIS, W.L.

    This document addresses the preferred combination of design and operational configurations to provide heat removal from high-level waste tanks during Phase 1 waste feed delivery to prevent the waste temperature from exceeding tank safety requirement limits. An interim decision for the preferred method to remove the heat from the high-level waste tanks during waste feed delivery operations is presented herein.

  1. 41 CFR 60-741.68 - Reinstatement of ineligible contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ineligible contractors. 60-741.68 Section 60-741.68 Public Contracts and Property Management Other Provisions..., DEPARTMENT OF LABOR 741-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND... Reinstatement of ineligible contractors. (a) Application for reinstatement. A contractor debarred from further...

  2. 41 CFR 60-300.68 - Reinstatement of ineligible contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ineligible contractors. 60-300.68 Section 60-300.68 Public Contracts and Property Management Other Provisions..., DEPARTMENT OF LABOR 300-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND... ineligible contractors. (a) Application for reinstatement. A contractor debarred from further contracts for...

  3. 41 CFR 60-250.68 - Reinstatement of ineligible contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ineligible contractors. 60-250.68 Section 60-250.68 Public Contracts and Property Management Other Provisions..., DEPARTMENT OF LABOR 250-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND... ineligible contractors. (a) Application for reinstatement. A contractor debarred from further contracts for...

  4. Development and flight test of metal-lined CFRP cryogenic tank for reusable rocket

    NASA Astrophysics Data System (ADS)

    Higuchi, Ken; Takeuchi, Shinsuke; Sato, Eiichi; Naruo, Yoshihiro; Inatani, Yoshifumi; Namiki, Fumiharu; Tanaka, Kohtaro; Watabe, Yoko

    2005-07-01

    A cryogenic tank made of carbon fiber reinforced plastic (CFRP) shell with aluminum thin liner has been designed as a liquid hydrogen (LH2) tank for an ISAS reusable launch vehicle, and the function of it has been proven by repeated flights onboard the test vehicle called reusable vehicle testing (RVT) in October 2003. The liquid hydrogen tank has to be a pressure vessel, because the fuel of the engine of the test vehicle is supplied by fuel pressure. The pressure vessel of a combination of the outer shell of CFRP for strength element at a cryogenic temperature and the inner liner of aluminum for gas barrier has shown excellent weight merit for this purpose. Interfaces such as tank outline shape, bulk capacity, maximum expected operating pressure (MEOP), thermal insulation, pipe arrangement, and measurement of data are also designed to be ready onboard. This research has many aims, not only development of reusable cryogenic composite tank but also the demonstration of repeated operation including thermal cycle and stress cycle, familiarization with test techniques of operation of cryogenic composite tanks, and the accumulation of data for future design of tanks, vehicle structures, safety evaluation, and total operation systems.

  5. Thermal stratification in LH2 tank of cryogenic propulsion stage tested in ISRO facility

    NASA Astrophysics Data System (ADS)

    Xavier, M.; Raj, R. Edwin; Narayanan, V.

    2017-02-01

    Liquid oxygen and hydrogen are used as oxidizer and fuel respectively in cryogenic propulsion system. These liquids are stored in foam insulated tanks of cryogenic propulsion system and are pressurized using warm pressurant gas supplied for tank pressure maintenance during cryogenic engine operation. Heat leak to cryogenic propellant tank causes buoyancy driven liquid stratification resulting in formation of warm liquid stratum at liquid free surface. This warm stratum is further heated by the admission of warm pressurant gas for tank pressurization during engine operation. Since stratified layer temperature has direct bearing on the cavitation free operation of turbo pumps integrated in cryogenic engine, it is necessary to model the thermal stratification for predicting stratified layer temperature and mass of stratified liquid in tank at the end of engine operation. These inputs are required for estimating the minimum pressure to be maintained by tank pressurization system. This paper describes configuration of cryogenic stage for ground qualification test, stage hot test sequence, a thermal model and its results for a foam insulated LH2 tank subjected to heat leak and pressurization with hydrogen gas at 200 K during liquid outflow at 38 lps for engine operation. The above model considers buoyancy flow in free convection boundary layer caused by heat flux from tank wall and energy transfer from warm pressurant gas etc. to predict temperature of liquid stratum and mass of stratified liquid in tank at the end of engine operation in stage qualification tests carried out in ISRO facility.

  6. 2020 Vision for Tank Waste Cleanup (One System Integration) - 12506

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harp, Benton; Charboneau, Stacy; Olds, Erik

    2012-07-01

    The mission of the Department of Energy's Office of River Protection (ORP) is to safely retrieve and treat the 56 million gallons of Hanford's tank waste and close the Tank Farms to protect the Columbia River. The millions of gallons of waste are a by-product of decades of plutonium production. After irradiated fuel rods were taken from the nuclear reactors to the processing facilities at Hanford they were exposed to a series of chemicals designed to dissolve away the rod, which enabled workers to retrieve the plutonium. Once those chemicals were exposed to the fuel rods they became radioactive andmore » extremely hot. They also couldn't be used in this process more than once. Because the chemicals are caustic and extremely hazardous to humans and the environment, underground storage tanks were built to hold these chemicals until a more permanent solution could be found. The Cleanup of Hanford's 56 million gallons of radioactive and chemical waste stored in 177 large underground tanks represents the Department's largest and most complex environmental remediation project. Sixty percent by volume of the nation's high-level radioactive waste is stored in the underground tanks grouped into 18 'tank farms' on Hanford's central plateau. Hanford's mission to safely remove, treat and dispose of this waste includes the construction of a first-of-its-kind Waste Treatment Plant (WTP), ongoing retrieval of waste from single-shell tanks, and building or upgrading the waste feed delivery infrastructure that will deliver the waste to and support operations of the WTP beginning in 2019. Our discussion of the 2020 Vision for Hanford tank waste cleanup will address the significant progress made to date and ongoing activities to manage the operations of the tank farms and WTP as a single system capable of retrieving, delivering, treating and disposing Hanford's tank waste. The initiation of hot operations and subsequent full operations of the WTP are not only dependent upon the

  7. Design, fabrication and test of a liquid hydrogen titanium honeycomb cryogenic test tank for use as a reusable launch vehicle main propellant tank

    NASA Astrophysics Data System (ADS)

    Stickler, Patrick B.; Keller, Peter C.

    1998-01-01

    Reusable Launch Vehicles (RLV's) utilizing LOX\\LH2 as the propellant require lightweight durable structural systems to meet mass fraction goals and to reduce overall systems operating costs. Titanium honeycomb sandwich with flexible blanket TPS on the windward surface is potentially the lightest-weight and most operable option. Light weight is achieved in part because the honeycomb sandwich tank provides insulation to its liquid hydrogen contents, with no need for separate cryogenic insulation, and in part because the high use temperature of titanium honeycomb reduces the required surface area of re-entry thermal protection systems. System operability is increased because TPS needs to be applied only to surfaces where temperatures exceed approximately 650 K. In order to demonstrate the viability of a titanium sandwich constructed propellant tank, a technology demonstration program was conducted including the design, fabrication and testing of a propellant tank-TPS system. The tank was tested in controlled as well as ambient environments representing ground hold conditions for a RLV main propellant tank. Data collected during each test run was used to validate predictions for air liquefaction, outside wall temperature, boil-off rates, frost buildup and its insulation effects, and the effects of placing a thermal protection system blanket on the external surface. Test results indicated that titanium honeycomb, when used as a RLV propellant tank material, has great promise as a light-weight structural system.

  8. 41 CFR 60-1.31 - Reinstatement of ineligible contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ineligible contractors. 60-1.31 Section 60-1.31 Public Contracts and Property Management Other Provisions..., DEPARTMENT OF LABOR 1-OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS General Enforcement; Compliance Review and Complaint Procedure § 60-1.31 Reinstatement of ineligible contractors. A contractor debarred from...

  9. Case Study in Corporate Memory Recovery: Hanford Tank Farms Miscellaneous Underground Waste Storage Tanks - 15344

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Washenfelder, D. J.; Johnson, J. M.; Turknett, J. C.

    In addition to managing the 177 underground waste storage tanks containing 212,000 m3 (56 million gal) of radioactive waste at the U. S. Department of Energy’s Hanford Site 200 Area Tank Farms, Washington River Protection Solutions LLC is responsible for managing numerous small catch tanks and special surveillance facilities. These are collectively known as “MUSTs” - Miscellaneous Underground Storage Tanks. The MUSTs typically collected drainage and flushes during waste transfer system piping changes; special surveillance facilities supported Tank Farm processes including post-World War II uranium recovery and later fission product recovery from tank wastes. Most were removed from service followingmore » deactivation of the single-shell tank system in 1980 and stabilized by pumping the remaining liquids from them. The MUSTs were isolated by blanking connecting transfer lines and adding weatherproofing to prevent rainwater entry. Over the next 30 years MUST operating records were dispersed into large electronic databases or transferred to the National Archives Regional Center in Seattle, Washington. During 2014 an effort to reacquire the historical bases for the MUSTs’ published waste volumes was undertaken. Corporate Memory Recovery from a variety of record sources allowed waste volumes to be initially determined for 21 MUSTs, and waste volumes to be adjusted for 37 others. Precursors and symptoms of Corporate Memory Loss were identified in the context of MUST records recovery.« less

  10. 48 CFR 952.251-70 - Contractor employee travel discounts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor employee travel... Contractor employee travel discounts. As prescribed in 951.7002, insert the following clause: Contractor Employee Travel Discounts (AUG 2009) (a) The Contractor shall take advantage of travel discounts offered to...

  11. 48 CFR 245.608 - Screening of contractor inventory.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Screening of contractor inventory. 245.608 Section 245.608 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS... Disposal of Contractor Inventory 245.608 Screening of contractor inventory. ...

  12. 48 CFR 1553.209 - Contractor qualifications.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor qualifications. 1553.209 Section 1553.209 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY CLAUSES AND FORMS FORMS Prescription of Forms 1553.209 Contractor qualifications. ...

  13. 28 CFR 548.14 - Community involvement (volunteers, contractors).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., contractors). 548.14 Section 548.14 Judicial Administration BUREAU OF PRISONS, DEPARTMENT OF JUSTICE... Community involvement (volunteers, contractors). (a) The institution's chaplain may contract with... require a recognized representative of the faith group to verify a volunteer's or contractor's religious...

  14. 48 CFR 45.501 - Prime contractor alternate locations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Prime contractor alternate... CONTRACT MANAGEMENT GOVERNMENT PROPERTY Support Government Property Administration 45.501 Prime contractor... administration from another contract administration office, for purposes of evaluating prime contractor...

  15. 48 CFR 1852.209-72 - Composition of the contractor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contractor. 1852.209-72 Section 1852.209-72 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND... and Clauses 1852.209-72 Composition of the contractor. As prescribed in 1809.670, insert the following clause: Composition of the Contractor (DEC 1988) If the Contractor is comprised of more than one legal...

  16. 40 CFR 35.938-6 - Progress payments to contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Progress payments to contractors. 35... § 35.938-6 Progress payments to contractors. (a) Policy. EPA policy is that, except as State law otherwise provides, grantees should make prompt progress payments to prime contractors and prime contractors...

  17. 48 CFR 53.209 - Contractor qualifications.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor qualifications. 53.209 Section 53.209 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION (CONTINUED) CLAUSES AND FORMS FORMS Prescription of Forms 53.209 Contractor qualifications. ...

  18. Residence time distribution measurements in a pilot-scale poison tank using radiotracer technique.

    PubMed

    Pant, H J; Goswami, Sunil; Samantray, J S; Sharma, V K; Maheshwari, N K

    2015-09-01

    Various types of systems are used to control the reactivity and shutting down of a nuclear reactor during emergency and routine shutdown operations. Injection of boron solution (borated water) into the core of a reactor is one of the commonly used methods during emergency operation. A pilot-scale poison tank was designed and fabricated to simulate injection of boron poison into the core of a reactor along with coolant water. In order to design a full-scale poison tank, it was desired to characterize flow of liquid from the tank. Residence time distribution (RTD) measurement and analysis was adopted to characterize the flow dynamics. Radiotracer technique was applied to measure RTD of aqueous phase in the tank using Bromine-82 as a radiotracer. RTD measurements were carried out with two different modes of operation of the tank and at different flow rates. In Mode-1, the radiotracer was instantaneously injected at the inlet and monitored at the outlet, whereas in Mode-2, the tank was filled with radiotracer and its concentration was measured at the outlet. From the measured RTD curves, mean residence times (MRTs), dead volume and fraction of liquid pumped in with time were determined. The treated RTD curves were modeled using suitable mathematical models. An axial dispersion model with high degree of backmixing was found suitable to describe flow when operated in Mode-1, whereas a tanks-in-series model with backmixing was found suitable to describe flow of the poison in the tank when operated in Mode-2. The results were utilized to scale-up and design a full-scale poison tank for a nuclear reactor. Copyright © 2015 Elsevier Ltd. All rights reserved.

  19. SU-E-T-118: Analysis of Variability and Stability Between Two Water Tank Phantoms Utilizing Water Tank Commissioning Procedures

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Roring, J; Saenz, D; Cruz, W

    2015-06-15

    Purpose: The commissioning criteria of water tank phantoms are essential for proper accuracy and reproducibility in a clinical setting. This study outlines the results of mechanical and dosimetric testing between PTW MP3-M water tank system and the Standard Imaging Doseview 3D water tank system. Methods: Measurements were taken of each axis of movement on the tank using 30 cm calipers at 1, 5, 10, 50, 100, and 200 mm for accuracy and reproducibility of tank movement. Dosimetric quantities such as percent depth dose and dose profiles were compared between tanks using a 6 MV beam from a Varian 23EX LINAC.more » Properties such as scanning speed effects, central axis depth dose agreement with static measurements, reproducibility of measurements, symmetry and flatness, and scan time between tanks were also investigated. Results: Results showed high geometric accuracy within 0.2 mm. Central axis PDD and in-field profiles agreed within 0.75% between the tanks. These outcomes test many possible discrepancies in dose measurements across the two tanks and form a basis for comparison on a broader range of tanks in the future. Conclusion: Both 3D water scanning phantoms possess a high degree of spatial accuracy, allowing for equivalence in measurements regardless of the phantom used. A commissioning procedure when changing water tanks or upon receipt of a new tank is nevertheless critical to ensure consistent operation before and after the arrival of new hardware.« less

  20. 48 CFR 1552.209-76 - Contractor performance evaluations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor performance... 1552.209-76 Contractor performance evaluations. As prescribed in section 1509.170-1, insert the following clause in all applicable solicitations and contracts. Contractor Performance Evaluations (OCT 2002...

  1. 48 CFR 8.406-7 - Contractor Performance Evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor Performance... ACQUISITION PLANNING REQUIRED SOURCES OF SUPPLIES AND SERVICES Federal Supply Schedules 8.406-7 Contractor Performance Evaluation. Ordering activities must prepare an evaluation of contractor performance for each...

  2. 48 CFR 2936.201 - Evaluation of contractor performance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Evaluation of contractor... Construction 2936.201 Evaluation of contractor performance. The HCA must establish procedures to evaluate construction contractor performance and prepare performance reports as required by FAR 36.201. ...

  3. 48 CFR 32.909 - Contractor inquiries.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor inquiries. 32.909 Section 32.909 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Prompt Payment 32.909 Contractor inquiries. (a) Direct questions...

  4. 46 CFR 153.408 - Tank overflow control.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... automatic shutdown system must: (1) Be independent of one-another; and (2) Operate on loss of power. (c) The... lettering as specified for the warning sign in § 153.955. (e) A tank overflow alarm must be audible and... loading is controlled on the tankship. (f) The automatic shutdown system or tank overflow alarm must be...

  5. 46 CFR 153.408 - Tank overflow control.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... automatic shutdown system must: (1) Be independent of one-another; and (2) Operate on loss of power. (c) The... lettering as specified for the warning sign in § 153.955. (e) A tank overflow alarm must be audible and... loading is controlled on the tankship. (f) The automatic shutdown system or tank overflow alarm must be...

  6. 48 CFR 2152.215-70 - Contractor records retention.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor records... PRECONTRACT PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 2152.215-70 Contractor records retention. As prescribed in 2115.071, insert the following clause: Contractor Records Retention (OCT 2005...

  7. 75 FR 69037 - Medicaid Program; Recovery Audit Contractors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-10

    ... [CMS-6034-P] RIN 0938-AQ19 Medicaid Program; Recovery Audit Contractors AGENCY: Centers for Medicare... Recovery Audit Contractors (Medicaid RACs) and the payment methodology for State payments to Medicaid RACs... RACs coordinate with other contractors and entities auditing Medicaid providers and with State and...

  8. 48 CFR 3036.201 - Evaluation of contractor performance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Evaluation of contractor performance. 3036.201 Section 3036.201 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY... contractor performance. (a)(2) Performance reports shall be prepared and entered into the Contractor...

  9. 48 CFR 36.506 - Superintendence by the contractor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contractor. 36.506 Section 36.506 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... Superintendence by the contractor. The contracting officer shall insert the clause at 52.236-6, Superintendence by the Contractor, in solicitations and contracts when a fixed-price construction contract or a fixed...

  10. 48 CFR 2452.251-70 - Contractor employee travel.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor employee travel... 2452.251-70 Contractor employee travel. As prescribed in 2451.7001, insert the following clause in all cost-reimbursement solicitations and contracts involving travel: Contractor Employee Travel (OCT 1999...

  11. 76 FR 57807 - Medicaid Program; Recovery Audit Contractors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-16

    ... for Medicare & Medicaid Services 42 CFR Part 455 Medicaid Program; Recovery Audit Contractors; Final... 42 CFR Part 455 [CMS-6034-F] RIN 0938-AQ19 Medicaid Program; Recovery Audit Contractors AGENCY... costs of Medicaid Recovery Audit Contractors (Medicaid RACs) and the payment methodology for State...

  12. 48 CFR 1652.204-70 - Contractor records retention.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor records... of FEHBP Clauses 1652.204-70 Contractor records retention. As prescribed in 1604.705 the following clause will be inserted in all FEHB Program contracts. Contractor Records Retention (JUL 2005...

  13. 48 CFR 952.227-11 - Patent rights-retention by the contractor (short form).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... process or method; or to operate, in the case of a machine or system; and, in each case, under such... 60 days after learning of the failure of the Contractor to disclose or elect within the specified...

  14. 48 CFR 952.227-11 - Patent rights-retention by the contractor (short form).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... process or method; or to operate, in the case of a machine or system; and, in each case, under such... 60 days after learning of the failure of the Contractor to disclose or elect within the specified...

  15. 48 CFR 952.227-11 - Patent rights-retention by the contractor (short form).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... process or method; or to operate, in the case of a machine or system; and, in each case, under such... 60 days after learning of the failure of the Contractor to disclose or elect within the specified...

  16. 48 CFR 952.227-11 - Patent rights-retention by the contractor (short form).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... process or method; or to operate, in the case of a machine or system; and, in each case, under such... 60 days after learning of the failure of the Contractor to disclose or elect within the specified...

  17. 48 CFR 46.105 - Contractor responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... CONTRACT MANAGEMENT QUALITY ASSURANCE General 46.105 Contractor responsibilities. (a) The contractor is responsible for carrying out its obligations under the contract by— (1) Controlling the quality of supplies or..., subassemblies, etc., have an acceptable quality control system; and (4) Maintaining substantiating evidence...

  18. 48 CFR 46.105 - Contractor responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... CONTRACT MANAGEMENT QUALITY ASSURANCE General 46.105 Contractor responsibilities. (a) The contractor is responsible for carrying out its obligations under the contract by— (1) Controlling the quality of supplies or..., subassemblies, etc., have an acceptable quality control system; and (4) Maintaining substantiating evidence...

  19. 48 CFR 46.105 - Contractor responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... CONTRACT MANAGEMENT QUALITY ASSURANCE General 46.105 Contractor responsibilities. (a) The contractor is responsible for carrying out its obligations under the contract by— (1) Controlling the quality of supplies or..., subassemblies, etc., have an acceptable quality control system; and (4) Maintaining substantiating evidence...

  20. 48 CFR 46.105 - Contractor responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... CONTRACT MANAGEMENT QUALITY ASSURANCE General 46.105 Contractor responsibilities. (a) The contractor is responsible for carrying out its obligations under the contract by— (1) Controlling the quality of supplies or..., subassemblies, etc., have an acceptable quality control system; and (4) Maintaining substantiating evidence...

  1. 48 CFR 4.102 - Contractor's signature.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor's signature. 4.102 Section 4.102 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL ADMINISTRATIVE MATTERS Contract Execution 4.102 Contractor's signature. (a) Individuals. A contract with an...

  2. 48 CFR 253.209 - Contractor qualifications.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contractor qualifications. 253.209 Section 253.209 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS FORMS Prescription of Forms 253.209 Contractor qualifications. ...

  3. The contractor`s role in low-level waste disposal facility application review and licensing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Serie, P.J.; Dressen, A.L.

    1991-12-31

    The California Department of Health Services will soon reach a licensing decision on the proposed Ward Valley low-level radioactive waste disposal facility. As the first regulatory agency in the country to address the 10 CFR Part 61 requirements for a new disposal facility, California`s program has broken new ground in its approach. Throughout the review process, the Department has relied on contractor support to augment its technical and administrative staff. A team consisting of Roy F. Weston, Inc., supported by ERM-Program Management Corp., Environmental Issues Management, Inc., and Rogers and Associates Engineering Corporation, has worked closely with the Department inmore » a staff extension role. The authors have been involved with the project in contractor project management roles since 1987, and continue to support the Department`s program as it proceeds to finalize its licensing process. This paper describes the selection process used to identify a contractor team with the needed skills and experience, and the makeup of team capabilities. It outlines the management, communication, and technical approaches used to assure a smooth agency-contractor function and relationship. It describes the techniques used to ensure that decisions and documents represented the Department credibly in its role as the regulatory and licensing agency under the Nuclear Regulatory Commission (NRC) Agreement State program. The paper outlines the license application review process and activities, through preparation of licensing documentation and responses to public comments. Lessons learned in coordination of an agency-contractor team effort to review and license a low-level waste disposal facility are reviewed and suggestions made for approaching a similar license application review and licensing situation.« less

  4. 48 CFR 252.242-7005 - Contractor business systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Contractor business... of Provisions And Clauses 252.242-7005 Contractor business systems. As prescribed in 242.7001, use the following clause: Contractor Business Systems (FEB 2012) (a) This clause only applies to covered...

  5. 48 CFR 252.242-7005 - Contractor business systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Contractor business... of Provisions And Clauses 252.242-7005 Contractor business systems. As prescribed in 242.7001, use the following clause: Contractor Business Systems (FEB 2012) (a) This clause only applies to covered...

  6. 48 CFR 252.242-7005 - Contractor business systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Contractor business... of Provisions And Clauses 252.242-7005 Contractor business systems. As prescribed in 242.7001, use the following clause: CONTRACTOR BUSINESS SYSTEMS (MAY 2011) (a) Definitions. As used in this clause...

  7. 48 CFR 252.242-7005 - Contractor business systems.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Contractor business... of Provisions And Clauses 252.242-7005 Contractor business systems. As prescribed in 242.7001, use the following clause: Contractor Business Systems (FEB 2012) (a) This clause only applies to covered...

  8. 48 CFR 53.209-1 - Responsible prospective contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contractors. 53.209-1 Section 53.209-1 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION (CONTINUED) CLAUSES AND FORMS FORMS Prescription of Forms 53.209-1 Responsible prospective contractors. (a) SF 1403 (Rev. 9/88), Preaward Survey of Prospective Contractor (General). SF 1403 is authorized for...

  9. 30 CFR 874.16 - Contractor eligibility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Contractor eligibility. 874.16 Section 874.16 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR ABANDONED MINE LAND RECLAMATION GENERAL RECLAMATION REQUIREMENTS § 874.16 Contractor eligibility. To receive...

  10. 30 CFR 875.20 - Contractor eligibility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Contractor eligibility. 875.20 Section 875.20 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR ABANDONED MINE LAND RECLAMATION CERTIFICATION AND NONCOAL RECLAMATION § 875.20 Contractor eligibility. Every...

  11. Contractor Motivation Theory and Applications.

    DTIC Science & Technology

    1981-03-01

    Project Officer, Chief, Test and Evaluation Group , US Army Procurement Research Office, ALMC. BS, Aeronautical Engineering, University of Wyoming, 1963...Contractor Motivation Theory and Applications SEE DISTRIBUTION Inclosed is a copy of subject report for your use . This report describes the DOD contractor...motivation process and various areas for improvement. In particular, it identifies effective incentives that can be used and recommends policy that

  12. 20 CFR 655.19 - Job contractor filing requirements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 20 Employees' Benefits 3 2013-04-01 2013-04-01 false Job contractor filing requirements. 655.19... States (H-2B Workers) Application for Temporary Employment Certification Filing Procedures § 655.19 Job contractor filing requirements. (a) Provided that a job contractor and any employer-client are joint...

  13. 20 CFR 655.19 - Job contractor filing requirements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 20 Employees' Benefits 3 2014-04-01 2014-04-01 false Job contractor filing requirements. 655.19... States (H-2B Workers) Application for Temporary Employment Certification Filing Procedures § 655.19 Job contractor filing requirements. (a) Provided that a job contractor and any employer-client are joint...

  14. 20 CFR 655.19 - Job contractor filing requirements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 3 2012-04-01 2012-04-01 false Job contractor filing requirements. 655.19... States (H-2B Workers) Application for Temporary Employment Certification Filing Procedures § 655.19 Job contractor filing requirements. (a) Provided that a job contractor and any employer-client are joint...

  15. 32 CFR 516.21 - Litigation against government contractors.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 3 2012-07-01 2009-07-01 true Litigation against government contractors. 516.21... government contractors. (a) General. A contract might require that the government reimburse a contractor (or... with the government requires reimbursement for adverse judgments or costs of the litigation, the SJA or...

  16. 7 CFR 3015.183 - Access to contractor records.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Access to contractor records. 3015.183 Section 3015... contractor records. The Attachment 0 requires recipients to include in specified kinds of contracts a provision for access to the contractor's records by the recipient and the Federal government. The following...

  17. 4 CFR 75.1 - Contractors' and vendors' certificates.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 4 Accounts 1 2010-01-01 2010-01-01 false Contractors' and vendors' certificates. 75.1 Section 75.1... BASIC VOUCHERS AND INVOICES § 75.1 Contractors' and vendors' certificates. (a) The Government... bills and invoices of contractors and vendors, with the exception that carriers, or other corporations...

  18. 33 CFR 157.102 - Plans for foreign tank vessels: Submission.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... CARRYING OIL IN BULK Crude Oil Washing (COW) System on Tank Vessels General § 157.102 Plans for foreign tank vessels: Submission. If the owner or operator of a foreign tank vessel having a COW system under... include— (a) A drawing or diagram of the COW pumping and piping system that meets 46 CFR 56.01-10(d); (b...

  19. 33 CFR 157.116 - Required documents: U.S. tank vessels.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... CARRYING OIL IN BULK Crude Oil Washing (COW) System on Tank Vessels General § 157.116 Required documents: U.S. tank vessels. The owner, operator, and master of a U.S. tank vessel having a COW system under... COW system consisting of— (1) A document from an authorized CS that certifies the vessel meets § 157...

  20. 48 CFR 3052.204-71 - Contractor employee access.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Contractor employee access... CLAUSES Text of Provisions and Clauses 3052.204-71 Contractor employee access. As prescribed in (HSAR) 48...: Contractor Employee Access (JUN 2006) (a) “Sensitive Information,” as used in this Chapter, means any...

  1. 78 FR 51658 - Weighing, Feed, and Swine Contractors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-21

    ... RIN 0580-AA99 Weighing, Feed, and Swine Contractors AGENCY: Grain Inspection, Packers and Stockyards... and swine contractors to poultry and swine production contract growers are based on accurate weighing... reweighing to add swine contractors to the list of firms that must comply, and adding feed to the list of...

  2. Contractor Accounting, Reporting and Estimating (CARE).

    DTIC Science & Technology

    Contractor Accounting Reporting and Estimating (CARE) provides check lists that may be used as guides in evaluating the accounting system, financial reporting , and cost estimating capabilities of the contractor. Experience gained from the Management Review Technique was used as a basis for the check lists. (Author)

  3. Assessment of performing an MST strike in Tank 21H

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Poirier, Michael R.

    2014-09-29

    Previous Savannah River National Laboratory (SRNL) tank mixing studies performed for the Small Column Ion Exchange (SCIX) project have shown that 3 Submersible Mixer Pumps (SMPs) installed in Tank 41 are sufficient to support actinide removal by MST sorption as well as subsequent resuspension and removal of settled solids. Savannah River Remediation (SRR) is pursuing MST addition into Tank 21 as part of the Large Tank Strike (LTS) project. The preliminary scope for LTS involves the use of three standard slurry pumps (installed in N, SE, and SW risers) in a Type IV tank. Due to the differences in tankmore » size, internal interferences, and pump design, a separate mixing evaluation is required to determine if the proposed configuration will allow for MST suspension and strontium and actinide sorption. The author performed the analysis by reviewing drawings for Tank 21 [W231023] and determining the required cleaning radius or zone of influence for the pumps. This requirement was compared with previous pilot-scale MST suspension data collected for SCIX that determined the cleaning radius, or zone of influence, as a function of pump operating parameters. The author also reviewed a previous Tank 50 mixing analysis that examined the ability of standard slurry pumps to suspend sludge particles. Based on a review of the pilot-scale SCIX mixing tests and Tank 50 pump operating experience, three standard slurry pumps should be able to suspend sludge and MST to effectively sorb strontium and actinides onto the MST. Using the SCIX data requires an assumption about the impact of cooling coils on slurry pump mixing. The basis for this assumption is described in this report. Using the Tank 50 operating experience shows three standard slurry pumps should be able to suspend solids if the shear strength of the settled solids is less than 160 Pa. Because Tank 21 does not contain cooling coils, the shear strength could be larger.« less

  4. 48 CFR 945.610-4 - Contractor inventory in foreign countries.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor inventory in... CONTRACT MANAGEMENT GOVERNMENT PROPERTY Reporting, Redistribution, and Disposal of Contractor Inventory 945.610-4 Contractor inventory in foreign countries. Contractor inventory located in foreign countries...

  5. 41 CFR 109-43.302-50 - Utilization by designated contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... designated contractors. 109-43.302-50 Section 109-43.302-50 Public Contracts and Property Management Federal... Utilization by designated contractors. Heads of field organizations may authorize designated contractors to... Federal agency, provided the designated contractors have written policies and procedures. ...

  6. 49 CFR 10.27 - Government contractors.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 1 2014-10-01 2014-10-01 false Government contractors. 10.27 Section 10.27 Transportation Office of the Secretary of Transportation MAINTENANCE OF AND ACCESS TO RECORDS PERTAINING TO INDIVIDUALS Maintenance of Records § 10.27 Government contractors. When the Department provides by a contract...

  7. 49 CFR 10.27 - Government contractors.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 1 2011-10-01 2011-10-01 false Government contractors. 10.27 Section 10.27 Transportation Office of the Secretary of Transportation MAINTENANCE OF AND ACCESS TO RECORDS PERTAINING TO INDIVIDUALS Maintenance of Records § 10.27 Government contractors. When the Department provides by a contract...

  8. 49 CFR 10.27 - Government contractors.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 1 2012-10-01 2012-10-01 false Government contractors. 10.27 Section 10.27 Transportation Office of the Secretary of Transportation MAINTENANCE OF AND ACCESS TO RECORDS PERTAINING TO INDIVIDUALS Maintenance of Records § 10.27 Government contractors. When the Department provides by a contract...

  9. 49 CFR 10.27 - Government contractors.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 1 2013-10-01 2013-10-01 false Government contractors. 10.27 Section 10.27 Transportation Office of the Secretary of Transportation MAINTENANCE OF AND ACCESS TO RECORDS PERTAINING TO INDIVIDUALS Maintenance of Records § 10.27 Government contractors. When the Department provides by a contract...

  10. Wall mounted heat exchanger characterization. [cryogenic propellant tanks

    NASA Technical Reports Server (NTRS)

    Bullard, B. R.

    1975-01-01

    Analytical models are presented for describing the heat and mass transfer and the energy distribution in the contents of a cryogenic propellant tank, under varying gravity levels. These models are used to analytically evaluate the effectiveness of a wall heat exchanger as a means of controlling the pressure in the tank during flight and during fill operations. Pressure and temperature histories are presented for tanks varying in size from 4 to 22.5 feet in diameter and gravity levels from 0-1. Results from the subscale test program, utilizing both non-cryogenic and cryogenic fluid, designed to evaluate a tank wall heat exchanger are described and compared with the analytical models. Both the model and test results indicate that a passive tank wall heat exchanger can effectively control tank pressure. However, the weight of such a system is considerably higher than that of an active mixer system.

  11. Development of deep drawn aluminum piston tanks

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Whitehead, J.C.; Bronder, R.L.; Kilgard, L.W.

    1990-06-08

    An aluminum piston tank has been developed for applications requiring lightweight, low cost, low pressure, positive-expulsion liquid storage. The 3 liter (183 in{sup 3}) vessel is made primarily from aluminum sheet, using production forming and joining operations. The development process relied mainly on pressurizing prototype parts and assemblies to failure, as the primary source of decision making information for driving the tank design toward its optimum minimum-mass configuration. Critical issues addressed by development testing included piston operation, strength of thin-walled formed shells, alloy choice, and joining the end cap to the seamless deep drawn can. 9 refs., 8 figs.

  12. RECOMMENDATIONS FOR SAMPLING OF TANK 18 IN F TANK FARM

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shine, G.

    2009-12-14

    Representative sampling is required for characterization of the residual floor material in Tank 18 prior to operational closure. Tank 18 is an 85-foot diameter, 34-foot high carbon steel tank with nominal operating volume of 1,300,000 gallons. It is a Type IV tank, and has been in service storing radioactive materials since 1959. Recent mechanical cleaning of the tank removed all mounds of material. Anticipating a low level of solids in the residual material, Huff and Thaxton [2009] developed a plan to sample the material during the final clean-up process while it would still be resident in sufficient quantities to supportmore » analytical determinations in four quadrants of the tank. Execution of the plan produced fewer solids than expected to support analytical determinations in all four quadrants. Huff and Thaxton [2009] then restructured the plan to characterize the residual floor material separately in the North and the South regions: two 'hemispheres.' This document provides sampling recommendations to complete the characterization of the residual material on the tank bottom following the guidance in Huff and Thaxton [2009] to split the tank floor into a North and a South hemisphere. The number of samples is determined from a modification of the formula previously published in Edwards [2001] and the sample characterization data for previous sampling of Tank 18 described by Oji [2009]. The uncertainty is quantified by an upper 95% confidence limit (UCL95%) on each analyte's mean concentration in Tank 18. The procedure computes the uncertainty in analyte concentration as a function of the number of samples, and the final number of samples is determined when the reduction in the uncertainty from an additional sample no longer has a practical impact on results. The characterization of the full suite of analytes in the North hemisphere is currently supported by a single Mantis rover sample obtained from a compact region near the center riser. A floor scrape

  13. 33 CFR 157.33 - Water ballast in fuel oil tanks.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Water ballast in fuel oil tanks... OIL IN BULK Vessel Operation § 157.33 Water ballast in fuel oil tanks. A new vessel may not carry ballast water in a fuel oil tank. [CGD 74-32, 40 FR 48283, Oct. 14, 1975, as amended by USCG-2000-7641, 66...

  14. Auxiliary resonant DC tank converter

    DOEpatents

    Peng, Fang Z.

    2000-01-01

    An auxiliary resonant dc tank (ARDCT) converter is provided for achieving soft-switching in a power converter. An ARDCT circuit is coupled directly across a dc bus to the inverter to generate a resonant dc bus voltage, including upper and lower resonant capacitors connected in series as a resonant leg, first and second dc tank capacitors connected in series as a tank leg, and an auxiliary resonant circuit comprising a series combination of a resonant inductor and a pair of auxiliary switching devices. The ARDCT circuit further includes first clamping means for holding the resonant dc bus voltage to the dc tank voltage of the tank leg, and second clamping means for clamping the resonant dc bus voltage to zero during a resonant period. The ARDCT circuit resonantly brings the dc bus voltage to zero in order to provide a zero-voltage switching opportunity for the inverter, then quickly rebounds the dc bus voltage back to the dc tank voltage after the inverter changes state. The auxiliary switching devices are turned on and off under zero-current conditions. The ARDCT circuit only absorbs ripples of the inverter dc bus current, thus having less current stress. In addition, since the ARDCT circuit is coupled in parallel with the dc power supply and the inverter for merely assisting soft-switching of the inverter without participating in real dc power transmission and power conversion, malfunction and failure of the tank circuit will not affect the functional operation of the inverter; thus a highly reliable converter system is expected.

  15. Water tank installed at A-3 Test Stand

    NASA Technical Reports Server (NTRS)

    2009-01-01

    A water tank is lifted into place at the A-3 Test Stand being built at NASA's John C. Stennis Space Center. Fourteen water, liquid oxygen (LOX) and isopropyl alcohol (IPA) tanks are being installed to support the chemical steam generators to be used on the A-3 Test Stand. The IPA and LOX tanks will provide fuel for the generators. The water will allow the generators to produce steam that will be used to reduce pressure inside the stand's test cell diffuser, enabling operators to simulate altitudes up to 100,000 feet. In that way, operators can perform the tests needed on rocket engines being built to carry humans back to the moon and possibly beyond. The A-3 Test Stand is set for completion and activation in 2011.

  16. Water tank installed at A-3 Test Stand

    NASA Image and Video Library

    2009-08-13

    A water tank is lifted into place at the A-3 Test Stand being built at NASA's John C. Stennis Space Center. Fourteen water, liquid oxygen (LOX) and isopropyl alcohol (IPA) tanks are being installed to support the chemical steam generators to be used on the A-3 Test Stand. The IPA and LOX tanks will provide fuel for the generators. The water will allow the generators to produce steam that will be used to reduce pressure inside the stand's test cell diffuser, enabling operators to simulate altitudes up to 100,000 feet. In that way, operators can perform the tests needed on rocket engines being built to carry humans back to the moon and possibly beyond. The A-3 Test Stand is set for completion and activation in 2011.

  17. 76 FR 37704 - Federal Acquisition Regulation; Documenting Contractor Performance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-28

    ... Federal Acquisition Regulation; Documenting Contractor Performance AGENCY: Department of Defense (DoD..., and to require all past performance information be entered into the Contractor Performance Assessment... Contractor Performance Information. These changes provide Governmentwide standardized evaluation factors and...

  18. Self-anchoring mast for deploying a high-speed submersible mixer in a tank

    DOEpatents

    Cato, Jr., Joseph E.; Shearer, Paul M [Aiken, SC; Rodwell, Philip O [Evans, GA

    2004-10-12

    A self-anchoring mast for deploying a high-speed submersible mixer in a tank includes operably connected first and second mast members (20, 22) and a foot member 46 operably connected to the second mast member for supporting the mast in a tank. The second mast member includes a track (36, 38) for slidably receiving a bearing of the mixer to change the orientation of the mixer in the tank.

  19. 241-AY Double Shell Tanks (DST) Integrity Assessment Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    JENSEN, C.E.

    1999-09-21

    This report presents the results of the integrity assessment of the 241-AY double-shell tank farm facility located in the 200 East Area of the Hanford Site. The assessment included the design evaluation and integrity examinations of the tanks and concluded that the facility is adequately designed, is compatible with the waste, and is fit for use. Recommendations including subsequent examinations. are made to ensure the continued safe operation of the tanks.

  20. F-Tank Farm Performance Assessment Updates through the Special Analysis Process at Savannah River Site - 12169

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Layton, Mark H.

    2012-07-01

    The F-Area Tank Farm (FTF) is owned by the U.S. Department of Energy and operated by Savannah River Remediation, LLC (SRR), Liquid Waste Operations contractor at DOE's Savannah River Site (SRS). The FTF is in the north-central portion of the SRS and occupies approximately 22 acres within F-Area. The FTF is an active radioactive waste storage facility consisting of 22 carbon steel waste tanks and ancillary equipment such as transfer lines, evaporators and pump tanks. An FTF Performance Assessment (PA) was prepared to support the eventual closure of the FTF underground radioactive waste tanks and ancillary equipment. The PA providesmore » the technical basis and results to be used in subsequent documents to demonstrate compliance with the pertinent requirements identified below for final closure of FTF. The FTank Farm is subject to a state industrial waste water permit and Federal Facility Agreement. Closure documentation will include an F-Tank Farm Closure Plan and tank-specific closure modules utilizing information from the performance assessment. For this reason, the State of South Carolina and the Environmental Protection Agency must be involved in the performance assessment review process. The residual material remaining after tank cleaning is also subject to reclassification prior to closure via a waste determination pursuant to Section 3116 of the Ronald W. Reagan National Defense Authorization Act of Fiscal Year 2005. The projected waste tank inventories in the FTF PA provide reasonably bounding FTF inventory projections while taking into account uncertainties in the effectiveness of future tank cleaning technologies. As waste is removed from the FTF waste tanks, the residual contaminants will be sampled and the remaining residual inventory is characterized. In this manner, tank specific data for the tank inventories at closure will be available to supplement the waste tank inventory projections currently used in the FTF PA. For FTF, the new tank specific

  1. 48 CFR 1852.242-73 - NASA contractor financial management reporting.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA contractor financial... Provisions and Clauses 1852.242-73 NASA contractor financial management reporting. As prescribed in 1842.7202, insert the following clause: NASA Contractor Financial Management Reporting (NOV 2004) (a) The Contractor...

  2. 48 CFR 1852.242-73 - NASA contractor financial management reporting.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false NASA contractor financial... Provisions and Clauses 1852.242-73 NASA contractor financial management reporting. As prescribed in 1842.7202, insert the following clause: NASA Contractor Financial Management Reporting (NOV 2004) (a) The Contractor...

  3. 48 CFR 1852.242-73 - NASA contractor financial management reporting.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false NASA contractor financial... Provisions and Clauses 1852.242-73 NASA contractor financial management reporting. As prescribed in 1842.7202, insert the following clause: NASA Contractor Financial Management Reporting (NOV 2004) (a) The Contractor...

  4. 48 CFR 1852.242-73 - NASA contractor financial management reporting.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false NASA contractor financial... Provisions and Clauses 1852.242-73 NASA contractor financial management reporting. As prescribed in 1842.7202, insert the following clause: NASA Contractor Financial Management Reporting (NOV 2004) (a) The Contractor...

  5. The Contractor's Role in Competitive Bid Construction.

    ERIC Educational Resources Information Center

    Toy, G. Arlan

    1986-01-01

    In a competitive bid situation, the general contractor's first priority is controlling construction costs. The actions the general contractor take focus on adequate control, effective communication, efficient use of resources, and prevention of delays. (MLF)

  6. Glass Bubbles Insulation for Liquid Hydrogen Storage Tanks

    NASA Astrophysics Data System (ADS)

    Sass, J. P.; Cyr, W. W. St.; Barrett, T. M.; Baumgartner, R. G.; Lott, J. W.; Fesmire, J. E.

    2010-04-01

    A full-scale field application of glass bubbles insulation has been demonstrated in a 218,000 L liquid hydrogen storage tank. This work is the evolution of extensive materials testing, laboratory scale testing, and system studies leading to the use of glass bubbles insulation as a cost efficient and high performance alternative in cryogenic storage tanks of any size. The tank utilized is part of a rocket propulsion test complex at the NASA Stennis Space Center and is a 1960's vintage spherical double wall tank with an evacuated annulus. The original perlite that was removed from the annulus was in pristine condition and showed no signs of deterioration or compaction. Test results show a significant reduction in liquid hydrogen boiloff when compared to recent baseline data prior to removal of the perlite insulation. The data also validates the previous laboratory scale testing (1000 L) and full-scale numerical modeling (3,200,000 L) of boiloff in spherical cryogenic storage tanks. The performance of the tank will continue to be monitored during operation of the tank over the coming years.

  7. 76 FR 60838 - Debarment, Suspension, and Ineligibility of Contractors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-30

    ... GOVERNMENT ACCOUNTABILITY OFFICE Debarment, Suspension, and Ineligibility of Contractors AGENCY... of government contractors. As a legislative branch agency, GAO is not subject to the requirements of... (hereinafter, contractors) who are responsible. However, GAO's Procurement Order has not explicitly referenced...

  8. 78 FR 12106 - Debarment, Suspension, and Ineligibility of Contractors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-21

    ... OFFICE OF PERSONNEL MANAGEMENT Debarment, Suspension, and Ineligibility of Contractors AGENCY: U.S... Acquisition Regulation (FAR) regarding the debarment, suspension, and ineligibility of government contractors... ensure that it contracts only with those entities and individuals (hereinafter, contractors) who are...

  9. Hanford Double-Shell Tank Extent-of-Condition Review - 15498

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, J. M.; Baide, D. D.; Barnes, T. J.

    2014-11-19

    During routine visual inspections of Hanford double-shell waste tank 241-AY-102 (AY-102), anomalies were identified on the annulus floor which resulted in further evaluations. Following a formal leak assessment in October 2012, Washington River Protection Solutions, LLC (WRPS) determined that the primary tank of AY-102 was leaking. A formal leak assessment, documented in RPP-ASMT-53793, Tank 241-AY-102 Leak Assessment Report, identified first-of-a-kind construction difficulties and trial-and-error repairs as major contributing factors to tank failure.1 To determine if improvements in double-shell tank (DST) construction occurred after construction of tank AY-102, a detailed review and evaluation of historical construction records was performed for Hanford’smore » remaining twenty-seven DSTs. Review involved research of 241 boxes of historical project documentation to better understand the condition of the Hanford DST farms, noting similarities in construction difficulties/issues to tank AY-102. Information gathered provides valuable insight regarding construction difficulties, future tank operations decisions, and guidance of the current tank inspection program. Should new waste storage tanks be constructed in the future, these reviews also provide valuable lessons-learned.« less

  10. Lifecycle Verification of Tank Liner Polymers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Anovitz, Lawrence; Smith, Barton

    2014-03-01

    This report describes a method that was developed for the purpose of assessing the durability of thermoplastic liners used in a Type IV hydrogen storage tank during the tank s expected service life. In the method, a thermoplastic liner specimen is cycled between the maximum and minimum expected working temperatures while it is differentially pressurized with high-pressure hydrogen gas. The number of thermal cycling intervals corresponds to those expected within the tank s design lifetime. At prescribed intervals, hydrogen permeation measurements are done in situ to assess the ability of the liner specimen to maintain its hydrogen barrier properties andmore » to model its permeability over the tank lifetime. Finally, the model is used to assess whether the steady-state leakage rate in the tank could potentially exceed the leakage specification for hydrogen fuel cell passenger vehicles. A durability assessment was performed on a specimen of high-density polyethylene (HDPE) that is in current use as a tank liner. Hydrogen permeation measurements were performed on several additional tank liner polymers as well as novel polymers proposed for use as storage tank liners and hydrogen barrier materials. The following technical barriers from the Fuel Cell Technologies Program MYRDD were addressed by the project: D. Durability of on-board storage systems lifetime of at least 1500 cycles G. Materials of construction vessel containment that is resistant to hydrogen permeation M. Lack of Tank Performance Data and Understanding of Failure Mechanisms And the following technical targets1 for on-board hydrogen storage systems R&D were likewise addressed: Operational cycle life (1/4 tank to full) FY 2017: 1500 cycles; Ultimate: 1500 cycles Environmental health & safety Permeation and leakage: Meets or exceeds applicable standards Loss of useable H2: FY 2017: 0.05 g/h/kg H2; Ultimate: 0.05 g/h/kg H2« less

  11. Glass Bubbles Insulation for Liquid Hydrogen Storage Tanks

    NASA Technical Reports Server (NTRS)

    Sass, J. P.; SaintCyr, W. W.; Barrett, T. M.; Baumgartner, R. G.; Lott, J. W.; Fesmire, J. E.

    2009-01-01

    A full-scale field application of glass bubbles insulation has been demonstrated in a 218,000 L liquid hydrogen storage tank. This work is the evolution of extensive materials testing, laboratory scale testing, and system studies leading to the use of glass bubbles insulation as a cost efficient and high performance alternative in cryogenic storage tanks of any size. The tank utilized is part of a rocket propulsion test complex at the NASA Stennis Space Center and is a 1960's vintage spherical double wall tank with an evacuated annulus. The original perlite that was removed from the annulus was in pristine condition and showed no signs of deterioration or compaction. Test results show a significant reduction in liquid hydrogen boiloff when compared to recent baseline data prior to removal of the perlite insulation. The data also validates the previous laboratory scale testing (1000 L) and full-scale numerical modeling (3,200,000 L) of boiloff in spherical cryogenic storage tanks. The performance of the tank will continue to be monitored during operation of the tank over the coming years. KEYWORDS: Glass bubble, perlite, insulation, liquid hydrogen, storage tank.

  12. X-34 Main Propulsion System Design and Operation

    NASA Technical Reports Server (NTRS)

    Champion, R. J., Jr.; Darrow, R. J., Jr.

    1998-01-01

    The X-34 program is a joint industry/government program to develop, test, and operate a small, fully-reusable hypersonic flight vehicle, utilizing technologies and operating concepts applicable to future Reusable Launch Vehicle (RLV) systems. The vehicle will be capable of Mach 8 flight to 250,000 feet altitude and will demonstrate an all composite structure, composite RP-1 tank, the Marshall Space Flight Center (MSFC) developed Fastrac engine, and the operability of an advanced thermal protection systems. The vehicle will also be capable of carrying flight experiments. MSFC is supporting the X-34 program in three ways: Program Management, the Fastrac engine as Government Furnished Equipment (GFE), and the design of the Main Propulsion System (MPS). The MPS Product Development Team (PDT) at MSFC is responsible for supplying the MPS design, analysis, and drawings to Orbital. The MPS consists of the LOX and RP-1 Fill, Drain, Feed, Vent, & Dump systems and the Helium & Nitrogen Purge, Pressurization, and Pneumatics systems. The Reaction Control System (RCS) design was done by Orbital. Orbital is the prime contractor and has responsibility for integration, procurement, and construction of all subsystems. The paper also discusses the design, operation, management, requirements, trades studies, schedule, and lessons learning with the MPS and RCS designs.

  13. 77 FR 7579 - Debarment, Suspension, and Ineligibility of Contractors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-13

    ... GOVERNMENT ACCOUNTABILITY OFFICE Debarment, Suspension, and Ineligibility of Contractors AGENCY... government contractors. Comments on GAO's policy were due on or before November 14, 2011. GAO received two... debarment, suspension, and ineligibility of government contractors. Neither comment suggested any changes to...

  14. Private Security Contractors: The Other Force

    DTIC Science & Technology

    2011-03-22

    improving PSC oversight. This paper will not address private contractors conducting Police force training , governmental use of PSCs outside of Iraq...theater entry requirements, conduct mandatory training , conduct weapons training and qualification and conduct security verification and criminal...an effective oversight program including contractor deployment tracking, limited contract oversight personnel, and untrained Contract Officer

  15. 41 CFR 109-45.300-50 - Sales by designated contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... contractors. 109-45.300-50 Section 109-45.300-50 Public Contracts and Property Management Federal Property... § 109-45.300-50 Sales by designated contractors. Sales of surplus contractor inventory will be conducted by designated contractors when heads of field organizations determine that it is in the best interest...

  16. 48 CFR 2110.7002 - Contractor investment of FEGLI Program funds.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Contractor investment of FEGLI Program funds. (a) The Contractor is required to invest and reinvest all FEGLI... Contractor is required to credit income earned from its investment of FEGLI Program funds to the FEGLI... appropriate manner. If the Contractor fails to invest funds on hand, properly allocate investment income, or...

  17. 18 CFR 1304.403 - Marina sewage pump-out stations and holding tanks.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... stations and holding tanks. 1304.403 Section 1304.403 Conservation of Power and Water Resources TENNESSEE... OTHER ALTERATIONS Miscellaneous § 1304.403 Marina sewage pump-out stations and holding tanks. All pump... operating requirements: (a) Spill-proof connection with shipboard holding tanks; (b) Suction controls or...

  18. 48 CFR 47.305-15 - Loading responsibilities of contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Loading responsibilities of contractors. 47.305-15 Section 47.305-15 Federal Acquisition Regulations System FEDERAL... responsibilities of contractors. (a)(1) Contractors are responsible for loading, blocking, and bracing carload...

  19. Long-term operation of a novel pilot-scale six tanks alternately operating activated sludge process in treating domestic wastewater.

    PubMed

    Mohammed, R N; Abu-Alhail, S; Xi-Wu, L

    2014-08-01

    The performance of a new pilot-scale six tanks activated sludge process has been evaluated for 303 d, receiving real domestic wastewater with a flow rate of 15-24.4 L/h. Partial nitrification via nitrite and microbial community structure were investigated in this system. The result shows that the nitrite accumulation rate was achieved successfully over 94% in the last aerobic compartment through a combination of short hydraulic retention time and low dissolved oxygen (DO) level. Fluorescence in situ hybridization analysis was used to correlate ammonia-oxidizing bacteria (AOB) numbers with nutrient removal via nitrite. It was shown that in response to complete and partial nitrification modes, the numbers of AOB population were 7.7 x 10(7) cells/g mixed liquor suspended solids (MLSS) and 5.31 x 10(8) cells/g MLSS, respectively. The morphology of the sludge indicated that there is a small rod-shaped and spherical cluster which was mainly dominantly bacterial according to scanning electron microscope. Higher pollutant removal efficiencies of 86.2%, 98%, and 96.1%, for total nitrogen, NH4+ - N, and total phosphorus, respectively, were achieved by a long-term operation of the six tanks activated sludge process at a low DO concentration and low chemical oxygen demand to nitrogen ratio which were approximately equal to the complete nitrification-ldenitrification with the addition of an external carbon source at a concentration of 1.5-2.5 mg/L.

  20. Innovative optronics for the new PUMA tank

    NASA Astrophysics Data System (ADS)

    Fritze, J.; Münzberg, M.; Schlemmer, H.

    2010-04-01

    The new PUMA tank is equipped with a fully stabilized 360° periscope. The thermal imager in the periscope is identical to the imager in the gunner sight. All optronic images of the cameras can be fed on every electronic display within the tank. The thermal imagers operate with a long wave 384x288 MCT starring focal plane array. The high quantum efficiency of MCT provides low NETD values at short integration times. The thermal imager has an image resolution of 768x576 pixels by means of a micro scanner. The MCT detector operates at high temperatures above 75K with high stability in noise and correctibility and offers high reliability (MTTF) values for the complete camera in a very compact design. The paper discusses the principle and functionality of the optronic combination of direct view optical channel, thermal imager and visible camera and discusses in detail the performances of the subcomponents with respect to demands for new tank applications.

  1. ICPP tank farm closure study. Volume 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Spaulding, B.C.; Gavalya, R.A.; Dahlmeir, M.M.

    1998-02-01

    The disposition of INEEL radioactive wastes is now under a Settlement Agreement between the DOE and the State of Idaho. The Settlement Agreement requires that existing liquid sodium bearing waste (SBW), and other liquid waste inventories be treated by December 31, 2012. This agreement also requires that all HLW, including calcined waste, be disposed or made road ready to ship from the INEEL by 2035. Sodium bearing waste (SBW) is produced from decontamination operations and HLW from reprocessing of SNF. SBW and HLW are radioactive and hazardous mixed waste; the radioactive constituents are regulated by DOE and the hazardous constituentsmore » are regulated by the Resource Conservation and Recovery Act (RCRA). Calcined waste, a dry granular material, is produced in the New Waste Calcining Facility (NWCF). Two primary waste tank storage locations exist at the ICPP: Tank Farm Facility (TFF) and the Calcined Solids Storage Facility (CSSF). The TFF has the following underground storage tanks: four 18,400-gallon tanks (WM 100-102, WL 101); four 30,000-gallon tanks (WM 103-106); and eleven 300,000+ gallon tanks. This includes nine 300,000-gallon tanks (WM 182-190) and two 318,000 gallon tanks (WM 180-181). This study analyzes the closure and subsequent use of the eleven 300,000+ gallon tanks. The 18,400 and 30,000-gallon tanks were not included in the work scope and will be closed as a separate activity. This study was conducted to support the HLW Environmental Impact Statement (EIS) waste separations options and addresses closure of the 300,000-gallon liquid waste storage tanks and subsequent tank void uses. A figure provides a diagram estimating how the TFF could be used as part of the separations options. Other possible TFF uses are also discussed in this study.« less

  2. 33 CFR 157.15 - Slop tanks in tank vessels.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Slop tanks in tank vessels. 157... (CONTINUED) POLLUTION RULES FOR THE PROTECTION OF THE MARINE ENVIRONMENT RELATING TO TANK VESSELS CARRYING OIL IN BULK Design, Equipment, and Installation § 157.15 Slop tanks in tank vessels. (a) Number. A...

  3. 33 CFR 157.15 - Slop tanks in tank vessels.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false Slop tanks in tank vessels. 157... (CONTINUED) POLLUTION RULES FOR THE PROTECTION OF THE MARINE ENVIRONMENT RELATING TO TANK VESSELS CARRYING OIL IN BULK Design, Equipment, and Installation § 157.15 Slop tanks in tank vessels. (a) Number. A...

  4. 33 CFR 157.15 - Slop tanks in tank vessels.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Slop tanks in tank vessels. 157... (CONTINUED) POLLUTION RULES FOR THE PROTECTION OF THE MARINE ENVIRONMENT RELATING TO TANK VESSELS CARRYING OIL IN BULK Design, Equipment, and Installation § 157.15 Slop tanks in tank vessels. (a) Number. A...

  5. 33 CFR 157.15 - Slop tanks in tank vessels.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Slop tanks in tank vessels. 157... (CONTINUED) POLLUTION RULES FOR THE PROTECTION OF THE MARINE ENVIRONMENT RELATING TO TANK VESSELS CARRYING OIL IN BULK Design, Equipment, and Installation § 157.15 Slop tanks in tank vessels. (a) Number. A...

  6. 46 CFR 169.234 - Integral fuel oil tank examinations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... operator of the vessel shall have the tanks cleaned out and gas freed as necessary to permit internal... an examination of the fuel tanks of each vessel during an internal structural examination at... and internally examined if the marine inspector is able to determine by external examination that the...

  7. 77 FR 6676 - Office of Inspector General; Contractor Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-09

    ... POSTAL SERVICE 39 CFR Part 230 Office of Inspector General; Contractor Requirements AGENCY: Postal... for contractors employed by the Office of Inspector General. The rule also emphasizes consistency in contractor selection, and clarifies the OIG's exclusive authority to set qualifications and standards for its...

  8. 41 CFR 109-40.000-50 - Applicability to contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... contractors. 109-40.000-50 Section 109-40.000-50 Public Contracts and Property Management Federal Property...-50 Applicability to contractors. DOE-PMR 109-40, Transportation and Traffic Management, should be applied to cost-type contractors' transportation and traffic management activities. Departure by cost-type...

  9. 48 CFR 923.102 - Applicability to contractors.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... contractors. 923.102 Section 923.102 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Sustainable Acquisition 923.102 Applicability to contractors. Many of the...

  10. 48 CFR 923.102 - Applicability to contractors.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... contractors. 923.102 Section 923.102 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Sustainable Acquisition 923.102 Applicability to contractors. Many of the...

  11. 48 CFR 923.102 - Applicability to contractors.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... contractors. 923.102 Section 923.102 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Sustainable Acquisition 923.102 Applicability to contractors. Many of the...

  12. 48 CFR 923.102 - Applicability to contractors.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... contractors. 923.102 Section 923.102 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Sustainable Acquisition 923.102 Applicability to contractors. Many of the...

  13. Fuel Tank Non-Nuclear Vulnerability Test Program

    DTIC Science & Technology

    1975-02-01

    configurations and structures , for all the threat velocities and obli~quities, alid for all the different fuel tank conditions. This is very unrealistic and can...of operational aircraft. It is, ot. course, imtpractical to simiul~ate all the potential conditions, threat variables, structural materials, and...simulate the structural members of the aircraft to which the aircraft skin and fuel tank walls are attached. The effect that paint, on the aircraft

  14. TankSIM: A Cryogenic Tank Performance Prediction Program

    NASA Technical Reports Server (NTRS)

    Bolshinskiy, L. G.; Hedayat, A.; Hastings, L. J.; Moder, J. P.; Schnell, A. R.; Sutherlin, S. G.

    2015-01-01

    Accurate prediction of the thermodynamic state of the cryogenic propellants in launch vehicle tanks is necessary for mission planning and successful execution. Cryogenic propellant storage and transfer in space environments requires that tank pressure be controlled. The pressure rise rate is determined by the complex interaction of external heat leak, fluid temperature stratification, and interfacial heat and mass transfer. If the required storage duration of a space mission is longer than the period in which the tank pressure reaches its allowable maximum, an appropriate pressure control method must be applied. Therefore, predictions of the pressurization rate and performance of pressure control techniques in cryogenic tanks are required for development of cryogenic fluid long-duration storage technology and planning of future space exploration missions. This paper describes an analytical tool, Tank System Integrated Model (TankSIM), which can be used for modeling pressure control and predicting the behavior of cryogenic propellant for long-term storage for future space missions. It is written in the FORTRAN 90 language and can be compiled with any Visual FORTRAN compiler. A thermodynamic vent system (TVS) is used to achieve tank pressure control. Utilizing TankSIM, the following processes can be modeled: tank self-pressurization, boiloff, ullage venting, and mixing. Details of the TankSIM program and comparisons of its predictions with test data for liquid hydrogen and liquid methane will be presented in the final paper.

  15. 77 FR 12754 - Contractor Legal Management Requirements; Acquisition Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-02

    ... DEPARTMENT OF ENERGY 10 CFR Part 719 48 Parts 931, 952 and 970 RIN 1990-AA37 Contractor Legal... rulemaking (NOPR) to revise existing regulations covering contractor legal management requirements and make... relating to the DOE notice of proposed rulemaking to revise existing regulations covering contractor legal...

  16. 48 CFR 2452.237-75 - Clearance of contractor personnel.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Clearance of contractor... Clauses 2452.237-75 Clearance of contractor personnel. As prescribed in 2437.110(e), insert the following clause in solicitations and contracts. Clearance of Contractor Personnel (OCT 1999) (a) General. This...

  17. 48 CFR 1252.237-70 - Qualifications of contractor employees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contractor employees. 1252.237-70 Section 1252.237-70 Federal Acquisition Regulations System DEPARTMENT OF....237-70 Qualifications of contractor employees. As prescribed in (TAR) 48 CFR 1237.110(a), insert the following clause: Qualifications of Contractor Employees (APR 2005) a. Definitions. As used in this clause...

  18. 27 CFR 24.229 - Tank car and tank truck requirements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2014-04-01 2014-04-01 false Tank car and tank truck... BUREAU, DEPARTMENT OF THE TREASURY ALCOHOL WINE Spirits § 24.229 Tank car and tank truck requirements. Railroad tank cars and tank trucks used to transport spirits for use in wine production will be constructed...

  19. 27 CFR 24.229 - Tank car and tank truck requirements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2012-04-01 2012-04-01 false Tank car and tank truck... BUREAU, DEPARTMENT OF THE TREASURY LIQUORS WINE Spirits § 24.229 Tank car and tank truck requirements. Railroad tank cars and tank trucks used to transport spirits for use in wine production will be constructed...

  20. 27 CFR 24.229 - Tank car and tank truck requirements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2010-04-01 2010-04-01 false Tank car and tank truck... BUREAU, DEPARTMENT OF THE TREASURY LIQUORS WINE Spirits § 24.229 Tank car and tank truck requirements. Railroad tank cars and tank trucks used to transport spirits for use in wine production will be constructed...

  1. 27 CFR 24.229 - Tank car and tank truck requirements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2013-04-01 2013-04-01 false Tank car and tank truck... BUREAU, DEPARTMENT OF THE TREASURY ALCOHOL WINE Spirits § 24.229 Tank car and tank truck requirements. Railroad tank cars and tank trucks used to transport spirits for use in wine production will be constructed...

  2. 27 CFR 24.229 - Tank car and tank truck requirements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2011-04-01 2011-04-01 false Tank car and tank truck... BUREAU, DEPARTMENT OF THE TREASURY LIQUORS WINE Spirits § 24.229 Tank car and tank truck requirements. Railroad tank cars and tank trucks used to transport spirits for use in wine production will be constructed...

  3. 40 CFR 63.133 - Process wastewater provisions-wastewater tanks.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... exothermic reaction or the contents of the tank is sparged, the owner or operator shall comply with the... specify a schedule of actions that will ensure that the wastewater tank will be emptied as soon as... that alternate storage capacity is unavailable, and shall specify a schedule of actions that will...

  4. A storage gas tank is moved to a pallet in the O&C

    NASA Technical Reports Server (NTRS)

    2001-01-01

    KENNEDY SPACE CENTER, Fla. -- In the Operations and Checkout Building, workers check out the placement of one of four gas tanks on the Spacelab Logistics Double Pallet. Part of the STS- 104 payload, the storage tanks two gaseous oxygen and two gaseous nitrogen -- comprise the high pressure gas assembly that will be attached to the Joint Airlock Module during two spacewalks. The tanks will support future spacewalk operations from the Station and augment the Service Module gas resupply system.

  5. A storage gas tank is moved to a pallet in the O&C

    NASA Technical Reports Server (NTRS)

    2001-01-01

    KENNEDY SPACE CENTER, Fla. -- Workers in the Operations and Checkout Building stand by while one of four gas tanks is moved toward the Spacelab Logistics Double Pallet. Part of the STS-104 payload, the storage tanks two gaseous oxygen and two gaseous nitrogen -- comprise the high pressure gas assembly that will be attached to the Joint Airlock Module during two spacewalks. The tanks will support future spacewalk operations from the Station and augment the Service Module gas resupply system.

  6. Summary of Activities for Nondestructive Evaluation of Insulation in Cryogenic Tanks

    NASA Technical Reports Server (NTRS)

    Arens, Ellen

    2012-01-01

    This project was undertaken to investigate methods to non-intrusively determine the existence and density of perlite insulation in the annular region of the cryogenic storage vessels, specifically considering the Launch Complex 39 hydrogen tanks at Kennedy Space Center. Lack of insulation in the tanks (as existed in the pad B hydrogen tank at Kennedy Space Center) results in an excessive loss of commodity and can pose operational and safety risks if precautions are not taken to relieve the excessive gas build-up. Insulation with a density that is higher than normal (due to settling or compaction) may also pose an operational and safety risk if the insulation prevents the system from moving and responding to expansions and contractions as fluid is removed and added to the tank.

  7. TANK 18-F AND 19-F TANK FILL GROUT SCALE UP TEST SUMMARY

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stefanko, D.; Langton, C.

    2012-01-03

    High-level waste (HLW) tanks 18-F and 19-F have been isolated from FTF facilities. To complete operational closure the tanks will be filled with grout for the purpose of: (1) physically stabilizing the tanks, (2) limiting/eliminating vertical pathways to residual waste, (3) entombing waste removal equipment, (4) discouraging future intrusion, and (5) providing an alkaline, chemical reducing environment within the closure boundary to control speciation and solubility of select radionuclides. This report documents the results of a four cubic yard bulk fill scale up test on the grout formulation recommended for filling Tanks 18-F and 19-F. Details of the scale upmore » test are provided in a Test Plan. The work was authorized under a Technical Task Request (TTR), HLE-TTR-2011-008, and was performed according to Task Technical and Quality Assurance Plan (TTQAP), SRNL-RP-2011-00587. The bulk fill scale up test described in this report was intended to demonstrate proportioning, mixing, and transportation, of material produced in a full scale ready mix concrete batch plant. In addition, the material produced for the scale up test was characterized with respect to fresh properties, thermal properties, and compressive strength as a function of curing time.« less

  8. 75 FR 3977 - Addressing Tax Delinquency by Government Contractors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-25

    ... Contractors #0; #0; #0; Presidential Documents #0; #0; #0;#0;Federal Register / Vol. 75, No. 15 / Monday... of January 20, 2010 Addressing Tax Delinquency by Government Contractors Memorandum for the Heads of... contractors and has an important obligation to protect American taxpayer money and the integrity of the...

  9. 76 FR 81408 - Contractor Legal Management Requirements; Acquisition Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-28

    ... DEPARTMENT OF ENERGY 10 CFR Part 719 48 CFR Parts 931, 952 and 970 RIN 1990-AA37 Contractor Legal... Energy (DOE or Department) is proposing to revise existing regulations covering contractor legal... costs by certain contractors whose contracts exceed $100,000,000 as well as legal counsel retained...

  10. 78 FR 25795 - Contractor Legal Management Requirements; Acquisition Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... DEPARTMENT OF ENERGY 10 CFR Part 719 48 CFR Parts 931, 952, and 970 RIN 1990-AA37 Contractor Legal.... ACTION: Final rule. SUMMARY: The Department of Energy revises existing regulations covering contractor... costs by certain contractors whose contracts exceed $100,000,000 as well as legal counsel retained...

  11. 48 CFR 52.236-6 - Superintendence by the Contractor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Contractor. 52.236-6 Section 52.236-6 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION....236-6 Superintendence by the Contractor. As prescribed in 36.506, insert the following clause: Superintendence by the Contractor (APR 1984) At all times during performance of this contract and until the work...

  12. 48 CFR 752.7013 - Contractor-mission relationships.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ....7013 Contractor-mission relationships. For use in all USAID contracts involving performance overseas... contract, and for advising USAID regarding the performance of the work under the contract and its effect on... of academic freedom. Notwithstanding these academic freedoms, the Contractor's employees, while in...

  13. 33 CFR 157.160 - Tanks: Ballasting and crude oil washing.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... CARRYING OIL IN BULK Crude Oil Washing (COW) System on Tank Vessels Cow Operations § 157.160 Tanks... vessel having a COW system under § 157.10a(a)(2) or § 157.10c(b)(2) shall ensure that— (1) Ballast water...

  14. POTENTIAL IMPACT OF TANK F FLUSH SOLUTION ON H-CANYON EVAPORATOR OPERATION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kyser, E.; Fondeur, F.; Fink, S.

    2010-09-13

    Previous chemical analysis of a sample from the liquid heel found in Tank F of the High Activity Drain (HAD) system in F/H laboratory revealed the presence of n-paraffin, tributyl phosphate (TBP), Modifier from the Modular Caustic-Side Solvent Extraction Unit (MCU) process and a vinyl ester resin that is very similar to the protective lining on Tank F. Subsequent analyses detected the presence of a small amount of diisopropylnaphthalene (DIN) (major component of Ultima Gold{trademark} AB liquid scintillation cocktail). Indications are that both vinyl ester resin and DIN are present in small amounts in the flush solution. The flush solutionmore » currently in the LR-56S trailer likely has an emulsion which is believed to contain a mixture of the reported organic species dominated by TBP. An acid treatment similar to that proposed to clear the HAD tank heel in F/H laboratory was found to allow separation of an organic phase from the cloudy sample tested by SRNL. Mixing of that clear sample did re-introduce some cloudiness that did not immediately clear but that cloudiness is attributed to the DIN in the matrix. An organic phase does quickly separate from the cloudy matrix allowing separation by a box decanter in H-Canyon prior to transfer to the evaporator feed tank. This separation should proceed normally as long as the emulsion is broken-up by acidification.« less

  15. Estimates of air emissions from asphalt storage tanks and truck loading

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Trumbore, D.C.

    1999-12-31

    Title V of the 1990 Clean Air Act requires the accurate estimation of emissions from all US manufacturing processes, and places the burden of proof for that estimate on the process owner. This paper is published as a tool to assist in the estimation of air emission from hot asphalt storage tanks and asphalt truck loading operations. Data are presented on asphalt vapor pressure, vapor molecular weight, and the emission split between volatile organic compounds and particulate emissions that can be used with AP-42 calculation techniques to estimate air emissions from asphalt storage tanks and truck loading operations. Since currentmore » AP-42 techniques are not valid in asphalt tanks with active fume removal, a different technique for estimation of air emissions in those tanks, based on direct measurement of vapor space combustible gas content, is proposed. Likewise, since AP-42 does not address carbon monoxide or hydrogen sulfide emissions that are known to be present in asphalt operations, this paper proposes techniques for estimation of those emissions. Finally, data are presented on the effectiveness of fiber bed filters in reducing air emissions in asphalt operations.« less

  16. California’s Shrinking Defense Contractors: Effects on Small Suppliers,

    DTIC Science & Technology

    1996-01-01

    They did not physically segregate any parts of their operations or set up a separate data management system to do business with prime contractors...of them out of business . * Small defense aerospace suppliers are not making cutting-edge products for commercial customers. Small defense aerospace...are considered critical to their primes’ supplier base are concerned. Most Firms Are Still in Business When we checked with a random sample of small

  17. 76 FR 31416 - Federal Acquisition Regulation; Oversight of Contractor Ethics Programs

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-31

    ...-AL92 Federal Acquisition Regulation; Oversight of Contractor Ethics Programs AGENCY: Department of... that contractors have implemented the mandatory contractor business ethics program requirements. DATES... to Improve DoD's Oversight of Contractor Ethics Programs. The ethics program requirement flows from...

  18. 48 CFR 227.7108 - Contractor data repositories.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Technical Data 227.7108 Contractor data repositories. (a) Contractor data repositories may be established... procedures for protecting technical data delivered to or stored at the repository from unauthorized release... disclosure of technical data from the repository to third parties consistent with the Government's rights in...

  19. 7 CFR 1924.276 - Action against contractor.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REGULATIONS CONSTRUCTION AND REPAIR Complaints and Compensation for Construction Defects § 1924.276 Action... construction defects which are the responsibility of the contractor, debarment proceedings will be initiated... the borrower's claim against the contractor or other party will be obtained if it appears to the...

  20. 7 CFR 1924.276 - Action against contractor.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... REGULATIONS CONSTRUCTION AND REPAIR Complaints and Compensation for Construction Defects § 1924.276 Action... construction defects which are the responsibility of the contractor, debarment proceedings will be initiated... the borrower's claim against the contractor or other party will be obtained if it appears to the...

  1. 7 CFR 1924.276 - Action against contractor.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... REGULATIONS CONSTRUCTION AND REPAIR Complaints and Compensation for Construction Defects § 1924.276 Action... construction defects which are the responsibility of the contractor, debarment proceedings will be initiated... the borrower's claim against the contractor or other party will be obtained if it appears to the...

  2. 7 CFR 1924.276 - Action against contractor.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... REGULATIONS CONSTRUCTION AND REPAIR Complaints and Compensation for Construction Defects § 1924.276 Action... construction defects which are the responsibility of the contractor, debarment proceedings will be initiated... the borrower's claim against the contractor or other party will be obtained if it appears to the...

  3. 7 CFR 1924.276 - Action against contractor.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... REGULATIONS CONSTRUCTION AND REPAIR Complaints and Compensation for Construction Defects § 1924.276 Action... construction defects which are the responsibility of the contractor, debarment proceedings will be initiated... the borrower's claim against the contractor or other party will be obtained if it appears to the...

  4. 48 CFR 1437.7001 - Contractor qualification requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor qualification requirements. 1437.7001 Section 1437.7001 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR... Contractor qualification requirements. (a) Prior to award of a contract for real property appraisal services...

  5. Iraq liquid radioactive waste tanks maintenance and monitoring program plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dennis, Matthew L.; Cochran, John Russell; Sol Shamsaldin, Emad

    2011-10-01

    The purpose of this report is to develop a project management plan for maintaining and monitoring liquid radioactive waste tanks at Iraq's Al-Tuwaitha Nuclear Research Center. Based on information from several sources, the Al-Tuwaitha site has approximately 30 waste tanks that contain varying amounts of liquid or sludge radioactive waste. All of the tanks have been non-operational for over 20 years and most have limited characterization. The program plan embodied in this document provides guidance on conducting radiological surveys, posting radiation control areas and controlling access, performing tank hazard assessments to remove debris and gain access, and conducting routine tankmore » inspections. This program plan provides general advice on how to sample and characterize tank contents, and how to prioritize tanks for soil sampling and borehole monitoring.« less

  6. 49 CFR 180.519 - Periodic retest and inspection of tank cars other than single-unit tank car tanks.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 2 2010-10-01 2010-10-01 false Periodic retest and inspection of tank cars other than single-unit tank car tanks. 180.519 Section 180.519 Transportation Other Regulations Relating to... of Tank Cars § 180.519 Periodic retest and inspection of tank cars other than single-unit tank car...

  7. 28 CFR 115.277 - Corrective action for contractors and volunteers.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... volunteers. 115.277 Section 115.277 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE... Corrective action for contractors and volunteers. (a) Any contractor or volunteer who engages in sexual abuse... contractor or volunteer. ...

  8. 28 CFR 115.277 - Corrective action for contractors and volunteers.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... volunteers. 115.277 Section 115.277 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE... Corrective action for contractors and volunteers. (a) Any contractor or volunteer who engages in sexual abuse... contractor or volunteer. ...

  9. 28 CFR 115.277 - Corrective action for contractors and volunteers.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... volunteers. 115.277 Section 115.277 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE... Corrective action for contractors and volunteers. (a) Any contractor or volunteer who engages in sexual abuse... contractor or volunteer. ...

  10. Isopropyl alcohol tank installed at A-3 Test Stand

    NASA Technical Reports Server (NTRS)

    2009-01-01

    An isopropyl alcohol (IPA) tank is lifted into place at the A-3 Test Stand being built at NASA's John C. Stennis Space Center. Fourteen IPA, water and liquid oxygen (LOX) tanks are being installed to support the chemical steam generators to be used on the A-3 Test Stand. The IPA and LOX tanks will provide fuel for the generators. The water will allow the generators to produce steam that will be used to reduce pressure inside the stand's test cell diffuser, enabling operators to simulate altitudes up to 100,000 feet. In that way, operators can perform the tests needed on rocket engines being built to carry humans back to the moon and possibly beyond. The A-3 Test Stand is set for completion and activation in 2011.

  11. Liquid oxygen tank installed at A-3 Test Stand

    NASA Technical Reports Server (NTRS)

    2009-01-01

    A liquid oxygen (LOX) tank is lifted into place at the A-3 Test Stand being built at NASA's John C. Stennis Space Center. Fourteen LOX, isopropyl alcohol (IPA) and water tanks are being installed to support the chemical steam generators to be used on the A-3 Test Stand. The IPA and LOX tanks will provide fuel for the generators. The water will allow the generators to produce steam that will be used to reduce pressure inside the stand's test cell diffuser, enabling operators to simulate altitudes up to 100,000 feet. In that way, operators can perform the tests needed on rocket engines being built to carry humans back to the moon and possibly beyond. The A-3 Test Stand is set for completion and activation in 2011.

  12. Liquid oxygen tank installed at A-3 Test Stand

    NASA Image and Video Library

    2009-09-18

    A liquid oxygen (LOX) tank is lifted into place at the A-3 Test Stand being built at NASA's John C. Stennis Space Center. Fourteen LOX, isopropyl alcohol (IPA) and water tanks are being installed to support the chemical steam generators to be used on the A-3 Test Stand. The IPA and LOX tanks will provide fuel for the generators. The water will allow the generators to produce steam that will be used to reduce pressure inside the stand's test cell diffuser, enabling operators to simulate altitudes up to 100,000 feet. In that way, operators can perform the tests needed on rocket engines being built to carry humans back to the moon and possibly beyond. The A-3 Test Stand is set for completion and activation in 2011.

  13. Isopropyl alcohol tank installed at A-3 Test Stand

    NASA Image and Video Library

    2009-09-18

    An isopropyl alcohol (IPA) tank is lifted into place at the A-3 Test Stand being built at NASA's John C. Stennis Space Center. Fourteen IPA, water and liquid oxygen (LOX) tanks are being installed to support the chemical steam generators to be used on the A-3 Test Stand. The IPA and LOX tanks will provide fuel for the generators. The water will allow the generators to produce steam that will be used to reduce pressure inside the stand's test cell diffuser, enabling operators to simulate altitudes up to 100,000 feet. In that way, operators can perform the tests needed on rocket engines being built to carry humans back to the moon and possibly beyond. The A-3 Test Stand is set for completion and activation in 2011.

  14. A storage gas tank is moved to a pallet in the O&C

    NASA Technical Reports Server (NTRS)

    2001-01-01

    KENNEDY SPACE CENTER, Fla. -- An overhead crane in the Operations and Checkout Building lowers one of four gas tanks onto the Spacelab Logistics Double Pallet while workers help guide it. Part of the STS-104 payload, the storage tanks two gaseous oxygen and two gaseous nitrogen -- comprise the high pressure gas assembly that will be attached to the Joint Airlock Module during two spacewalks. The tanks will support future spacewalk operations from the Station and augment the Service Module gas resupply system.

  15. Global Response of the Space Shuttle External Tank with the Presence of Intertank Stringer Cracks and Radius Blocks

    NASA Technical Reports Server (NTRS)

    Lovejoy, Andrew E.; Rankin, Charles C.

    2013-01-01

    After propellant was loaded into the external tank (ET), the November 5, 2010 launch of Space Shuttle mission STS-133 was scrubbed due to a gaseous hydrogen leak located in a vent line near the ground umbilical and ET connection. Subsequent visual inspections identified cracks in the sprayed-on foam insulation in the forward end of the ET intertank segment, adjacent to the liquid oxygen (LOX) tank, as shown in Figure 1. These cracks necessitated repair of the foam due to debris concerns that violated launch constraints. As part of the repair process, the affected foam was removed to reveal cracks in the underlying external hat stiffeners on the intertank, as shown in Figure 2. Ultimately, five stiffeners were discovered to be cracked adjacent to the LOX tank. As the managing center for the ET Project, NASA Marshall Space Flight Center (MSFC) coordinated failure investigation and repair activities among multiple organizations, which included the ET prime contractor (Lockheed Martin Space Systems Michoud Operations), the Space Shuttle Program Office at the NASA Johnson Space Center (JSC), the NASA Kennedy Space Center (KSC), and the NASA Engineering and Safety Center (NESC). STS-133 utilized the external tank designated as ET-137. Many aspects of the investigation have been reported previously in Refs. 1-7, which focus on the root cause of the failures, the flight readiness rationale and the local analyses of the stringer failures and repair. This paper summarizes the global analyses that were conducted on ET-137 as part of the NESC effort during the investigation, which was conducted primarily to determine if the repairs that were introduced to the stringers would alter the global response of the ET. In the process of the investigation, a new STAGS tabular input capability was developed to more easily introduce the aerodynamic pressure loads using a method that could easily be extended to incorporate finite element property data such as skin and stiffener

  16. 76 FR 77055 - Affirmative Action and Nondiscrimination Obligations of Contractors and Subcontractors Regarding...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-09

    ... asserted that quantitative and measurable analyses similar to those for minorities and women were needed to... provided few details about the design or operation of the California State program, and that, consequently... recommended that the contractor be required to invite voluntary self- identification at both the pre- and post...

  17. 21 CFR 20.90 - Disclosure to contractors.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... INFORMATION Limitations on Exemptions § 20.90 Disclosure to contractors. (a) Data and information otherwise... of such data and information as Food and Drug Administration employees. (b) A written agreement between the Food and Drug Administration and any contractor shall be entered into before data and...

  18. 21 CFR 20.90 - Disclosure to contractors.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... INFORMATION Limitations on Exemptions § 20.90 Disclosure to contractors. (a) Data and information otherwise... of such data and information as Food and Drug Administration employees. (b) A written agreement between the Food and Drug Administration and any contractor shall be entered into before data and...

  19. 48 CFR 1646.301 - Contractor inspection requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor inspection requirements. 1646.301 Section 1646.301 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT... Clauses 1646.301 Contractor inspection requirements. The clause set forth at 1652.246-70 shall be inserted...

  20. 14 CFR 1274.402 - Contractor acquired property.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Contractor acquired property. 1274.402 Section 1274.402 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION COOPERATIVE AGREEMENTS WITH COMMERCIAL FIRMS Property § 1274.402 Contractor acquired property. As provided in § 1274.923...