Sample records for teaching project management

  1. An Instructional Feedback Technique for Teaching Project Management Tools Aligned with PMBOK

    ERIC Educational Resources Information Center

    Gonçalves, Rafael Queiroz; von Wangenheim, Christiane Gresse; Hauck, Jean Carlo Rossa; Petri, Giani

    2017-01-01

    The management of contemporary software projects is unfeasible without the support of a Project Management (PM) tool. In order to enable the adoption of PM tools in practice, teaching its usage is important as part of computer education. Aiming at teaching PM tools, several approaches have been proposed, such as the development of educational PM…

  2. Teaching Project Management On-Line: Lessons Learned from MOOCs

    ERIC Educational Resources Information Center

    Falcao, Rita; Fernandes, Luis

    2016-01-01

    Creating a course for teaching project management online in a full online distance-learning environment was a challenge. Working with adult learners from different continents that want to complete a Master degree was an additional challenge. This paper describes how different MOOCs were used to learn about teaching -(meta) e-learning. MOOCs…

  3. Project MET. A Trainer's Guide. Management for Effective Teaching, A Title IV-C Project.

    ERIC Educational Resources Information Center

    Fairfax County Public Schools, VA. Dept. of Instructional Services.

    This guide provides trainers with a format and process for conducting inservice education programs for elementary school teachers on the use of the Management for Effective Teaching (MET) support kit. Project MET is a program developed to aid teachers in the Fairfax County (Virginia) public schools in implementing the school district curriculum,…

  4. A Design Thinking Approach to Teaching Knowledge Management

    ERIC Educational Resources Information Center

    Wang, Shouhong; Wang, Hai

    2008-01-01

    Pedagogies for knowledge management courses are still undeveloped. This Teaching Tip introduces a design thinking approach to teaching knowledge management. An induction model used to guide students' real-life projects for knowledge management is presented. (Contains 1 figure.)

  5. Project management practices in engineering university

    NASA Astrophysics Data System (ADS)

    Sirazitdinova, Y.; Dulzon, A.; Mueller, B.

    2015-10-01

    The article presents the analysis of usage of project management methodology in Tomsk Polytechnic University, in particular the experience with the course Project management which started 15 years ago. The article presents the discussion around advantages of project management methodology for engineering education and administration of the university in general and the problems impeding extensive implementation of this methodology in teaching, research and management in the university.

  6. Integrating a Project Management Approach to E-Business Application Course

    ERIC Educational Resources Information Center

    Chen, Kuan C.; Chuang, Keh-Wen

    2008-01-01

    Teaching students project managements requires a hands-on approach. Incorporating project management concepts and processes into a student team Web development project adds a dimension that exposes students to the realities of effective Web development. This paper will describe the project management approach used in a Web development course in…

  7. Using Group Projects to Teach Process Improvement in a Quality Class

    ERIC Educational Resources Information Center

    Neidigh, Robert O.

    2016-01-01

    This paper provides a description of a teaching approach that uses experiential learning to teach process improvement. The teaching approach uses student groups to perform and gather process data in a senior-level quality management class that focuses on Lean Six Sigma. A strategy to link the experiential learning in the group projects to the…

  8. Leading, Managing and Participating in Inter-University Teaching Grant Collaborations

    ERIC Educational Resources Information Center

    Willcoxson, Lesley; Kavanagh, Marie; Cheung, Lily

    2011-01-01

    In this paper we examine the leadership and management of multi-university collaborations funded by national teaching grants. The paper commences with a review of literature relating to stages of project development, key operational issues, impediments to collaboration and the leadership and management of teaching grant collaborations. Finally, we…

  9. Syllabi for the Teaching of Management Ethics.

    ERIC Educational Resources Information Center

    Dill, David D.; And Others

    Stemming from the Society for Values in Higher Education's project designed to examine the problems of management ethics, the following five syllabi focus on improving the teaching of ethics to persons preparing for careers in corporate and public management. Designed for use in public and private institutions, the syllabi are modeled to be…

  10. Building an Experiential Learning Model for a Project Management Course

    ERIC Educational Resources Information Center

    Chen, Kuan C.; Chuang, Keh-Wen

    2009-01-01

    Teaching students to become project management professionals requires a real world experience. Incorporating live clients into student projects, instead of using case studies or mock companies, adds a dimension that exposes students to the realities of project management. This paper will describe a structured methodology used in a project…

  11. Learning about Teaching: Initial Findings from the Measures of Effective Teaching Project. Research Paper. MET Project

    ERIC Educational Resources Information Center

    Bill & Melinda Gates Foundation, 2010

    2010-01-01

    In fall 2009, the Bill & Melinda Gates Foundation launched the Measures of Effective Teaching (MET) project to test new approaches to measuring effective teaching. The goal of the MET project is to improve the quality of information about teaching effectiveness available to education professionals within states and districts--information that…

  12. Using standardized patients to teach disease management skills to preclinical students: a pilot project.

    PubMed

    Brown, Amanda; Anderson, Delia; Szerlip, Harold M

    2003-01-01

    Physician adherence to practice guidelines has been poor. Exposure to such guidelines is not a routine part of medical school curricula. This study was designed to determine whether standardized patients could be used to teach preclinical students the skills to manage a patient with newly diagnosed diabetes mellitus. Students were assigned a standardized patient with hyperglycemia. The students were given guidelines on the management of diabetes and told to manage the patient appropriately. Patients' charts were reviewed to determine if all cardiovascular risks were managed appropriately. Students successfully managed all cardiovascular risks according to published guidelines. Participants overwhelmingly believed this methodology was a valuable way to teach disease management. Second-year students can use practice guidelines to successfully manage patients with diabetes. The students' performance exceeded the standards of care found in the published literature. This problem-based approach may be an ideal way to teach disease management.

  13. Assessment and management of burn pain at the Komfo Anokye Teaching Hospital: a best practice implementation project.

    PubMed

    Bayuo, Jonathan; Munn, Zachary; Campbell, Jared

    2017-09-01

    Pain management is a significant issue in health facilities in Ghana. For burn patients, this is even more challenging as burn pain has varied facets. Despite the existence of pharmacological agents for pain management, complaints of pain still persist. The aim of this project was to identify pain management practices in the burns units of Komfo Anokye Teaching Hospital, compare these approaches to best practice, and implement strategies to enhance compliance to standards. Ten evidence-based audit criteria were developed from evidence summaries. Using the Joanna Briggs Institute Practical Application of Clinical Evidence Software (PACES), a baseline audit was undertaken on a convenience sample of ten patients from the day of admission to the seventh day. Thereafter, the Getting Research into Practice (GRiP) component of PACES was used to identify barriers, strategies, resources and outcomes. After implementation of the strategies, a follow-up audit was undertaken using the same sample size and audit criteria. The baseline results showed poor adherence to best practice. However, following implementation of strategies, including ongoing professional education and provision of assessment tools and protocols, compliance rates improved significantly. Atlhough the success of this project was almost disrupted by an industrial action, collaboration with external bodies enabled the successful completion of the project. Pain management practices in the burns unit improved at the end of the project which reflects the importance of an audit process, education, providing feedback, group efforts and effective collaboration.

  14. Animosity, antagonism, and avatars: teaching conflict management in second life.

    PubMed

    Evans, Dena A; Curtis, Anthony R

    2011-11-01

    Conflict exists in all health care organizations and may take many forms, including lateral or horizontal violence. The Essentials of Baccalaureate Nursing Education identified the development of conflict resolution strategies as core knowledge required of the bachelor's of science in nursing generalist. However, learning the art of conflict management takes both time and practice. With competition for clinical space increasing, class time in short supply, and traditional clinical opportunities for teaching conflict management lacking, a virtual approach to teaching conflict resolution was explored through the use of Second Life®. The project presented here explored students' perceptions of this unique approach to learning conflict management and sought to examine the effectiveness of this teaching method. Copyright 2011, SLACK Incorporated.

  15. The Benefits of Teaching Self-Management Skills to Students of Psychology

    ERIC Educational Resources Information Center

    Kazemi, Ellie; Rice, Brian; Rylander, Alyssa; Morgan, Shannon F.

    2011-01-01

    The various student gains and reported satisfaction with self-management projects have been well documented. However, we found that few psychology programs explicitly teach these skills. In this paper we demonstrate how self-management projects can meet nine out of the ten undergraduate student learning goals outlined by the APA Task Force (2002).…

  16. How to Teach Emotional Intelligence Skills in IT Project Management

    ERIC Educational Resources Information Center

    Connolly, Amy J.; Reinicke, Bryan

    2017-01-01

    High emotional intelligence ("EQ") is considered one of the greatest strengths of an alpha project manager, yet undergraduate project management students are not directly trained in EQ soft skills such as communication, politics and teamwork. This article describes examples of active learning exercises implemented in an undergraduate IT…

  17. A Three Cohort Study of Role-Play Instruction for Agile Project Management

    ERIC Educational Resources Information Center

    Schmitz, Kurt

    2018-01-01

    Agile Project Management methods and processes that emphasize action and feedback over planning continue to gain prominence for Information Systems projects. This topic is an ideal candidate to lead the evolution of project management instruction from teaching "about" to learning "how to." This paper describes a role-play…

  18. Managing Substitute Teaching.

    ERIC Educational Resources Information Center

    Jones, Kevin R.

    1999-01-01

    This news brief presents information on managing substitute teaching. The information is based on issues discussed at a summit meeting which included public school administrators and personnel directors from around the nation. The main topics of concern focused around four core components related to the management of substitute teaching:…

  19. Teaching Research Methodology Using a Project-Based Three Course Sequence Critical Reflections on Practice

    ERIC Educational Resources Information Center

    Braguglia, Kay H.; Jackson, Kanata A.

    2012-01-01

    This article presents a reflective analysis of teaching research methodology through a three course sequence using a project-based approach. The authors reflect critically on their experiences in teaching research methods courses in an undergraduate business management program. The introduction of a range of specific techniques including student…

  20. Project-Based Teaching: Helping Students Make Project Connections

    NASA Astrophysics Data System (ADS)

    Johnson, Heather Jo Pusich

    Project-based curriculum materials are designed to support students in engaging with scientific content and practices in meaningful ways, with the goal of improving students' science learning. However, students need to understand the connections between what they are doing on a day-to-day basis with respect to the goals of the overall project for students to get the motivational and cognitive benefits of a project-based approach. In this dissertation, I looked at the challenges that four ninth grade science teachers faced as they helped students to make these connections using a project-based environmental science curriculum. The analysis revealed that in general when the curriculum materials made connections explicit, teachers were better able to articulate the relationship between the lesson and the project during enactment. However, whether the connections were explicit or implicit in the materials, enactments of the same lesson across teachers revealed that teachers leveraged different aspects of the project context in different ways depending on their knowledge, beliefs, and goals about project-based teaching. The quantitative analysis of student data indicated that when teacher enactments supported project goals explicitly, students made stronger connections between a lesson and the project goal. Therefore, a teacher's ability to make clear connections during classroom instruction is essential. Furthermore, when students made connections between each lesson and the larger project goals their attitudes toward the lesson were more positive and they performed better on the final assessment. These findings suggest that connections between individual lessons and the goals of the project are critical to the effectiveness of project-based learning. This study highlights that while some teachers were able to forge these connections successfully as a result of leveraging cognitive resources, teachers' beliefs, knowledge and goals about project-based teaching are

  1. Origami: An Active Learning Exercise for Scrum Project Management

    ERIC Educational Resources Information Center

    Sibona, Christopher; Pourreza, Saba; Hill, Stephen

    2018-01-01

    Scrum is a popular project management model for iterative delivery of software that subscribes to Agile principles. This paper describes an origami active learning exercise to teach the principles of Scrum in management information systems courses. The exercise shows students how Agile methods respond to changes in requirements during project…

  2. Teaching IT Project Management to Postgraduate Business Students: A Practical Approach

    ERIC Educational Resources Information Center

    Tatnall, Arthur; Reyes, Gina

    2005-01-01

    While most Information Systems (IS) professionals spend much of their time in the implementation or management of projects, the curriculum of university Information Technology (IT) courses does not always reflect this. While most university IT courses cover some aspects of project management, some do not go into this topic in any depth, and many…

  3. Foundation observation of teaching project--a developmental model of peer observation of teaching.

    PubMed

    Pattison, Andrew Timothy; Sherwood, Morgan; Lumsden, Colin James; Gale, Alison; Markides, Maria

    2012-01-01

    Peer observation of teaching is important in the development of educators. The foundation curriculum specifies teaching competencies that must be attained. We created a developmental model of peer observation of teaching to help our foundation doctors achieve these competencies and develop as educators. A process for peer observation was created based on key features of faculty development. The project consisted of a pre-observation meeting, the observation, a post-observation debrief, writing of reflective reports and group feedback sessions. The project was evaluated by completion of questionnaires and focus groups held with both foundation doctors and the students they taught to achieve triangulation. Twenty-one foundation doctors took part. All completed reflective reports on their teaching. Participants described the process as useful in their development as educators, citing specific examples of changes to their teaching practice. Medical students rated the sessions as better or much better quality as their usual teaching. The study highlights the benefits of the project to individual foundation doctors, undergraduate medical students and faculty. It acknowledges potential anxieties involved in having teaching observed. A structured programme of observation of teaching can deliver specific teaching competencies required by foundation doctors and provides additional benefits.

  4. Vocational Curriculum Modification. Teaching Technical Language to Learning Handicapped Students. Project HIRE: A Curriculum Management System for Instructing the Handicapped. Final Report, Volume 1.

    ERIC Educational Resources Information Center

    Gardner, David C.; And Others

    Volume 1 of the final report on Project HIRE reports the design, development, field-testing, and refining of self-instructional packages to teach entry level technical vocabulary to learning handicapped students mainstreamed in vocational programs. Volume 2, a management handbook, reports the methods and findings concerning development of…

  5. Innovation in health service management: Adoption of project management offices to support major health care transformation.

    PubMed

    Lavoie-Tremblay, Mélanie; Aubry, Monique; Cyr, Guylaine; Richer, Marie-Claire; Fortin-Verreault, Jean-François; Fortin, Claude; Marchionni, Caroline

    2017-11-01

    To explore the characteristics that influence project management offices acceptance and adoption in healthcare sector. The creation of project management offices has been suggested as a promising avenue to promote successful organisational change and facilitate evidence-based practice. However, little is known about the characteristics that promote their initial adoption and acceptance in health care sector. This knowledge is important in the context where many organisations are considering implementing project management offices with nurse managers as leaders. A descriptive multiple case study design was used. The unit of analysis was the project management offices. The study was conducted in three university-affiliated teaching hospitals in 2013-14 (Canada). Individual interviews (n = 34) were conducted with senior managers. Results reveal that project management offices dedicated to project and change management constitute an innovation and an added value that addresses tangible needs in the field. Project management offices are an innovation highly compatible with health care managers and their approach has parallels to the process of clinical problem solving and reasoning well-known to adopters. This knowledge is important in a context where many nurses hold various roles in project management offices, such as Director, project manager, clinical expert and knowledge broker. © 2017 John Wiley & Sons Ltd.

  6. Management in English Language Teaching.

    ERIC Educational Resources Information Center

    White, Ron; And Others

    Teachers making the transition from the classroom to management can find many guides on management, but none on management in English language teaching (ELT) schools in the United Kingdom and elsewhere in the world. This book offers that guidance to new managers and administrators interested in running an effective teaching organization. Because…

  7. Research Applications for Teaching (RAFT) Project. Final Report.

    ERIC Educational Resources Information Center

    Thomson, James R., Jr.; Handley, Herbert M.

    A report is given of the development and progress of the Research Applications for Teaching (RAFT) project, developed at Mississippi State University. Based upon research findings relative to effective teaching and effective schooling, five curriculum modules were prepared and implemented in instruction. In the second year of the project the…

  8. Project Approach: Teaching. Second Edition.

    ERIC Educational Resources Information Center

    Ho, Rose

    The primary objective of the action research chronicled (in English and Chinese) in this book was to shift the teaching method used by preschool teachers in Hong Kong from a teacher-directed mode by training them to use the Project Approach. The secondary objective was to measure children's achievement while using the Project Approach, focusing on…

  9. Effective Teaching Methods--Project-based Learning in Physics

    ERIC Educational Resources Information Center

    Holubova, Renata

    2008-01-01

    The paper presents results of the research of new effective teaching methods in physics and science. It is found out that it is necessary to educate pre-service teachers in approaches stressing the importance of the own activity of students, in competences how to create an interdisciplinary project. Project-based physics teaching and learning…

  10. Study on Case Teaching of Financial Management

    ERIC Educational Resources Information Center

    Che, Zhenghong; Che, Zhengmei

    2011-01-01

    Case teaching is an efficient teaching method of management. It plays an important role to enhance the students' ability to practice the theory. However, case teaching of financial management has not achieved the expected results. The paper aims to study the importance, characteristics and corresponding methods of case teaching method of financial…

  11. Techniques for Teaching Projective Assessment.

    ERIC Educational Resources Information Center

    Stagner, Brian H.

    1984-01-01

    Describes innovative methods for teaching projective assessment in a one semester graduate level clinical psychology course. The course fosters competence in the basics of administration, scoring, and in-depth interpretation of at least one test. (RM)

  12. Teaching emergency medical services management skills using a computer simulation exercise.

    PubMed

    Hubble, Michael W; Richards, Michael E; Wilfong, Denise

    2011-02-01

    Simulation exercises have long been used to teach management skills in business schools. However, this pedagogical approach has not been reported in emergency medical services (EMS) management education. We sought to develop, deploy, and evaluate a computerized simulation exercise for teaching EMS management skills. Using historical data, a computer simulation model of a regional EMS system was developed. After validation, the simulation was used in an EMS management course. Using historical operational and financial data of the EMS system under study, students designed an EMS system and prepared a budget based on their design. The design of each group was entered into the model that simulated the performance of the EMS system. Students were evaluated on operational and financial performance of their system design and budget accuracy and then surveyed about their experiences with the exercise. The model accurately simulated the performance of the real-world EMS system on which it was based. The exercise helped students identify operational inefficiencies in their system designs and highlighted budget inaccuracies. Most students rated the exercise as moderately or very realistic in ambulance deployment scheduling, budgeting, personnel cost calculations, demand forecasting, system design, and revenue projections. All students indicated the exercise was helpful in gaining a top management perspective, and 89% stated the exercise was helpful in bridging the gap between theory and reality. Preliminary experience with a computer simulator to teach EMS management skills was well received by students in a baccalaureate paramedic program and seems to be a valuable teaching tool. Copyright © 2011 Society for Simulation in Healthcare

  13. The National Geographic Society's Teaching Geography Project.

    ERIC Educational Resources Information Center

    Bockenhauer, Mark H.

    1993-01-01

    Contends that the National Geographic Society's Teaching Geography Project is an inservice teacher education success story. Describes the origins, objectives, and development of the project. Summarizes the impact of the project and contends that its success is the result of the workshop format and guided practice in instructional strategies. (CFR)

  14. Nurse managers' challenges in project management.

    PubMed

    Suhonen, Marjo; Paasivaara, Leena

    2011-11-01

    To analyse the challenges that nurse managers meet in project management. Project management done by nurse managers has a significant role in the success of projects conducted in work units. The data were collected by open interviews (n = 14). The participants were nurse managers, nurses and public health nurses. Data analysis was carried out using qualitative content analysis. The three main challenges nurse managers faced in project management in health-care work units were: (1) apathetic organization and management, (2) paralysed work community and (3) cooperation between individuals being discouraged. Nurse managers' challenges in project management can be viewed from the perspective of the following paradoxes: (1) keeping up projects-ensuring patient care, (2) enthusiastic management-effective management of daily work and (3) supporting the work of a multiprofessional team-leadership of individual employees. It is important for nurse managers to learn to relate these paradoxes to one another in a positive way. Further research is needed, focusing on nurse managers' ability to promote workplace spirituality, nurse managers' emotional intelligence and their enthusiasm in small projects. © 2011 Blackwell Publishing Ltd.

  15. Project Risk Management

    NASA Technical Reports Server (NTRS)

    Jr., R. F. Miles

    1995-01-01

    Project risk management is primarily concerned with performance, reliability, cost, and schedule. Environmental risk management is primarily concerned with human health and ecological hazards and likelihoods. This paper discusses project risk management and compares it to environmental risk management, both with respect to goals and implementation. The approach of the Jet Propulsion Laboratory to risk management is presented as an example of a project risk management approach that is an extension to NASA NHB 7120.5: Management of Major System Programs and Projects.

  16. Guidelines for Project Management

    NASA Technical Reports Server (NTRS)

    Ben-Arieh, David

    2001-01-01

    Project management is an important part of the professional activities at Kennedy Space Center (KSC). Project management is the means by which many of the operations at KSC take shape. Moreover, projects at KSC are implemented in a variety of ways in different organizations. The official guidelines for project management are provided by NASA headquarters and are quite general. The project reported herein deals with developing practical and detailed project management guidelines in support of the project managers. This report summarizes the current project management effort in the Process Management Division and presents a new modeling approach of project management developed by the author. The report also presents the Project Management Guidelines developed during the summer.

  17. Problems and Resolutions in the Practice of Project Teaching in Higher Vocational Schools

    ERIC Educational Resources Information Center

    Sheng, Zhichong; Tan, Jianhua

    2011-01-01

    Recently, there has been a hot discussion on project teaching theory among many higher vocational schools; however the practice of project teaching is still in the beginning period. Hence, many problems appear in project lead. This paper aims to analyze the existing problems in the practice of project teaching and also raise some resolutions.

  18. Teaching, Doing, and Sharing Project Management in a Studio Environment: The Development of an Instructional Design Open-Source Project Management Textbook

    ERIC Educational Resources Information Center

    Randall, Daniel L.; Johnson, Jacquelyn C.; West, Richard E.; Wiley, David A.

    2013-01-01

    In this article, the authors present an example of a project-based course within a studio environment that taught collaborative innovation skills and produced an open-source project management textbook for the field of instructional design and technology. While innovation plays an important role in our economy, and many have studied how to teach…

  19. An Instructional Feedback Technique for Teaching Project Management Tools Aligned With PMBOK

    ERIC Educational Resources Information Center

    Goncalves, Rafael Queiroz; von Wangenheim, Christiane A. Gresse; Hauck, Jean C. R.; Zanella, Andreia

    2018-01-01

    Contribution: An approach is presented to provide contextualized feedback for students using a project management (PM) tool. This approach covers the ten PM knowledge areas, guiding students through the planning of software projects. Background: Because software PM is unfeasible without the support of a PM tool there is a growing demand that these…

  20. Teaching the teacher program to assist nurse managers to educate nursing staff in Ecuadorian hospitals.

    PubMed

    Palmer, Sheri P; Heaston, Sondra

    2009-03-01

    Continuing education for hospital staff nurses is a concern worldwide. Current research shows that continuing education among nurses can positively affect patient outcomes (O'Brien, T., Freemantle, N., Oxman, A, et al., 2002. Interactive continuing education workshops or conferences can improve professional practice and patient outcomes. Journal of Evidence Based Nursing. 26 (5)). Seeing a need for improved patient outcomes among hospitals in Ecuador, we conducted a teaching the teacher program to assist nurse managers to carry-out continuing education in their hospital system. This teaching the teacher program was established through the collaboration between one College of Nursing in Utah, USA and a large healthcare system in Guayaquil, Ecuador. The collaboration has been ongoing for five years, 2003 to present. Initial projects included classes for the nursing staff including technical skills, life-saving techniques, and nursing process and assessment. Collaborators from the US and Ecuador believed that in order to maximize the improvement of nursing care in the hospital system it was necessary to turn attention on the nurse managers and not just the staff nurses. This would allow for meaningful ongoing learning beyond the one-time classroom setting. Continuing education is not common in Ecuadorian hospitals as it is in the United States. The purpose of this paper is to describe the project and provide initial evaluative data on the response to the curriculum; including evidence of managers using the teaching principles they were taught. The underlying aim of the project was to achieve a sustainable impact by teaching the leaders of each unit how to be more effective teachers. In May 2007, a two-day "teaching the teacher" workshop was developed with the needs of the managers in mind. The participants in the course included the chief nursing officer and leaders of various units of the hospital. In May 2008 a follow-up class was taught, along with an evaluation by

  1. Utilizing the Project Method for Teaching Culture and Intercultural Competence

    ERIC Educational Resources Information Center

    Euler, Sasha S.

    2017-01-01

    This article presents a detailed methodological outline for teaching culture through project work. It is argued that because project work makes it possible to gain transferrable and applicable knowledge and insight, it is the ideal tool for teaching culture with the aim of achieving real intercultural communicative competence (ICC). Preceding the…

  2. Approaches to Teaching Plant Nutrition. Children's Learning in Science Project.

    ERIC Educational Resources Information Center

    Leeds Univ. (England). Centre for Studies in Science and Mathematics Education.

    During the period 1984-1986, over 30 teachers from the Yorkshire (England) region have worked in collaboration with the Children's Learning in Science Project (CLIS) developing and testing teaching schemes in the areas of energy, particle theory, and plant nutrition. The project is based upon the constructivist approach to teaching. This document…

  3. The Role of an Academic Development Unit in Supporting Institutional VET Learning and Teaching Change Management

    ERIC Educational Resources Information Center

    Fotinatos, Nina

    2016-01-01

    The aim of this paper is to examine the role and impact of a central academic development unit (ADU) within an institutional strategic and operational change management project. The primary goal of this project was to improve vocational education and training (VET) learning and teaching practice in an Australian dual-sector regional university.…

  4. Innovation of University Teaching Faculty Management Mode

    ERIC Educational Resources Information Center

    Han, Yuzheng; Wang, Boyu

    2015-01-01

    With the deepening of university reform in China, the traditional teaching faculty management mode has been exposed more and more defects. To make innovation of the university teaching faculty management mode becomes the voice of the times. Universities should conduct careful research on this issue in the development. Starting from the…

  5. The Environmental Management Project Manager`s Handbook for improved project definition

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-02-01

    The United States Department of Energy (DOE) is committed to providing high quality products that satisfy customer needs and are the associated with this goal, DOE personnel must possess the knowledge, skills, and abilities to ensure successful job performance. In addition, there must be recognition that the greatest obstacle to proper project performance is inadequate project definition. Without strong project definition, DOE environmental management efforts are vulnerable to fragmented solutions, duplication of effort, and wastes resources. The primary means of ensuring environmental management projects meet cost and schedule milestones is through a structured and graded approach to project definition, whichmore » is the focus of this handbook.« less

  6. Reform and Practice of the Teaching Content System Based on the Management Course System of PBL

    ERIC Educational Resources Information Center

    Ao-tian, Peng

    2017-01-01

    With the development of the social economic conditions, society has a great change to the ability of the business management major students compare with the past, which requires colleges and universities to reform the teaching process. Combined with the relevant requirements of the project of training the talents of management major, we reform the…

  7. Managing Projects for Change: Contextualised Project Management

    ERIC Educational Resources Information Center

    Tynan, Belinda; Adlington, Rachael; Stewart, Cherry; Vale, Deborah; Sims, Rod; Shanahan, Peter

    2010-01-01

    This paper will detail three projects which focussed on enhancing online learning at a large Australian distance education University within a School of Business, School of Health and School of Education. Each project had special funding and took quite distinctive project management approaches, which reflect the desire to embed innovation and…

  8. Using Models to Teach Electricity--The CASTLE Project.

    ERIC Educational Resources Information Center

    Steinberg, Melvin S.; Wainwright, Camille L.

    1993-01-01

    Describes the Capacitor-Aided System for Teaching and Learning Electricity (CASTLE) project which is a high school electricity curriculum developed by high school and college physics teachers. The project is motivated by research on students' conceptual difficulties in electricity. The instructional materials developed allow students to challenge…

  9. An IS Project Management Course Project

    ERIC Educational Resources Information Center

    Frank, Ronald L.

    2010-01-01

    Information Systems curricula should provide project management (PM) theory, current practice, and hands-on experience. The schedule usually does not allow time in Analysis and Design courses for development oriented project management instruction other than a short introduction. Similarly, networking courses usually don't put project management…

  10. Teaching Natural Resource Management-Teaching Techniques and Difficulties in Greek Vocational Lyceum: A Case Study

    ERIC Educational Resources Information Center

    Koutsoukos, Marios; Mouratidis, Antonios

    2016-01-01

    The aim of the present study is to investigate the teaching techniques applied, as well as the difficulties, with which educators in teaching Natural Resource Management are confronted. For research purposes, a case study was conducted on teaching Natural Resource Management in the Third Grade of Vocational Lyceum (EPAL) in Northern Greece. It was…

  11. Experiencing teaching and learning quantitative reasoning in a project-based context

    NASA Astrophysics Data System (ADS)

    Muir, Tracey; Beswick, Kim; Callingham, Rosemary; Jade, Katara

    2016-12-01

    This paper presents the findings of a small-scale study that investigated the issues and challenges of teaching and learning about quantitative reasoning (QR) within a project-based learning (PjBL) context. Students and teachers were surveyed and interviewed about their experiences of learning and teaching QR in that context in contrast to teaching and learning mathematics in more traditional settings. The grade 9-12 student participants were characterised by a history of disengagement with mathematics and school in general, and the teacher participants were non-mathematics specialist teachers. Both students and teachers were new to the PjBL situation, which resulted in the teaching/learning relationship being a reciprocal one. The findings indicated that students and teachers viewed QR positively, particularly when compared with traditional mathematics teaching, yet tensions were identified for aspects such as implementation of curriculum and integration of relevant mathematics into projects. Both sets of participants identified situations where learning QR was particularly successful, along with concerns or difficulties about integrating QR into project work. The findings have implications for educators, who may need to examine their own approaches to mathematics teaching, particularly in terms of facilitating student engagement with the subject.

  12. Teaching Reform of Civil Engineering Materials Course Based on Project-Driven Pedagogy

    NASA Astrophysics Data System (ADS)

    Yidong, Xu; Wei, Chen; WeiguoJian, You; Jiansheng, Shen

    2018-05-01

    In view of the scattered experimental projects in practical courses of civil engineering materials, the poor practical ability of students and the disconnection between practical teaching and theoretical teaching, this paper proposes a practical teaching procedure. Firstly, the single experiment should be offered which emphasizes on improving the students’ basic experimental operating ability. Secondly, the compressive experiment is offered and the overall quality of students can be examined in the form of project team. In order to investigate the effect of teaching reform, the comparative analysis of the students of three grades (2014, 2015 and 2016) majored in civil engineering was conducted. The result shows that the students’ ability of experimental operation is obviously improved by using the project driven method-based teaching reform. Besides, the students’ ability to analyse and solve problems has also been improved.

  13. Your Guide for Teaching Money Management. [Revised.] Money Management.

    ERIC Educational Resources Information Center

    Baran, Nancy H., Ed.; Tarrant, Sharon M., Ed.

    This guide provides a framework for teaching consumer education to senior high and adult education classes. It may be used to develop a broad consumer economics program, to teach a single unit, or to incorporate money-managing concepts into various subject areas. Introductory materials include suggestions for adapting materials to curriculum…

  14. Teaching the Crisis Management/Communication Course.

    ERIC Educational Resources Information Center

    Coombs, W. Timothy

    2001-01-01

    Argues that a course or unit in crisis management/communication is an excellent way of teaching public relations theory, management concepts, information management, problem solving, and communication management. Identifies course objectives, discusses main topics and student evaluation, and concludes with advice and a list of readings. (SR)

  15. Psychology in an Interdisciplinary Setting: A Large-Scale Project to Improve University Teaching

    ERIC Educational Resources Information Center

    Koch, Franziska D.; Vogt, Joachim

    2015-01-01

    At a German university of technology, a large-scale project was funded as a part of the "Quality Pact for Teaching", a programme launched by the German Federal Ministry of Education and Research to improve the quality of university teaching and study conditions. The project aims at intensifying interdisciplinary networking in teaching,…

  16. Engaging Students--Teaching Scholar Partnerships. AACC Project Brief.

    ERIC Educational Resources Information Center

    San Felice, Faith; Barnett, Lynn

    This is a project brief on the American Association of Community Colleges (AACC) Teaching Scholar Partnerships (TSP) project, which is designed to reduce the shortage of qualified science and math educators in elementary, middle, and secondary schools. The Council of Independent Colleges (CIC) and the National Science Foundation (NSF) also…

  17. Managing Teaching and R&D: Diverging Views of Managers

    ERIC Educational Resources Information Center

    Kohtamaki, Vuokko

    2013-01-01

    Purpose: The purpose of this paper is to examine how the nature of management and leadership is related to the management and development of teaching and R&D (research and development) in higher education institutions. Design/methodology/approach: The nature of management and leadership is approached by consideration of transformational and…

  18. Discussion on teaching reform of environmental planning and management

    NASA Astrophysics Data System (ADS)

    Zhang, Qiugen; Chen, Suhua; Xie, Yu; Wei, Li'an; Ding, Yuan

    2018-05-01

    The curriculum of environmental planning and management is an environmental engineering major curriculum established by the teaching steering committee of environmental science and engineering of Education Ministry, which is the core curriculum of Chinese engineering education professional certification. It plays an important role in cultivating environmental planning and environmental management ability of environmental engineering major. The selection and optimization of the course teaching content of environmental planning and management were discussed which including curriculum teaching content updating and optimizing and teaching resource system construction. The comprehensive application of teaching method was discussed which including teaching method synthesis and teaching method. The final combination of the assessment method was also discussed which including the formative assessment normal grades and the final result of the course examination. Through the curriculum comprehensive teaching reform, students' knowledge had been broadened, the subject status and autonomy of learning had been enhanced, students' learning interest had been motivated, the ability of students' finding, analyzing and solving problems had been improved. Students' innovative ability and positive spirit had been well cultivated.

  19. A study on the effectiveness of task manager board game as a training tool in managing project

    NASA Astrophysics Data System (ADS)

    Yusof, Shahrul Azmi Mohd; Radzi, Shanizan Herman Md; Din, Sharifah Nadera Syed; Khalid, Nurhafizah

    2016-08-01

    Nowadays, games have become one of the useful tools in training. Many instructors choose to use games to enhance the way of delivering the subject. Failure to apply the suitable tool in training will lead to discouragement in learning and causing waste to the resources. An effective game will help the student understand the concept quickly. It can also help students to get involve in experiential learning where the student can manage and solve the problem as in the actual situation. This study will focus on the effectiveness of board game as a training tool for managing projects. This game has 4 tasks to be completed by students. They will be divided into a group of 4 or 5. Two methods are used in this study, pilot test, and post-test. These methods are chosen to analyze the effectiveness of using Task Manager Board Game as a teaching tool and the improvement of student's knowledge in project management. Three sub-components assessed were motivation, user experience and learning using case studies on Kirkpatrick's level one base on the perception of the students. The result indicated that the use of Task Manager board game as a training tool for managing project has a positive impact on students. It helps students to experience the situation of managing projects. It is one of the easiest ways for improving time management, human resources and communication skill.

  20. The Bologna Process Implementation and its Consequent Changes in the Teaching/Learning Model—the Industrial Management and Engineering Degree Case

    NASA Astrophysics Data System (ADS)

    Luísa Soares, Ana; Costa, Elga; Ferreira, Luís Pinto

    2009-11-01

    The present paper aims to present a Project included in a diversified programme and consequent implementation of a new Teaching/Learning model adapted to the Industrial Management and Engineering Degree (IMED) of the Management and Industrial Studies School (O'Porto Polytechnic Institute). Owning particular and specific characteristics, this model is based on the graduates' professional profile as well as on the work market dynamics, placing the student in the centre of the Learning Process, in opposition to the `teacher centred' method (as conceived by the Bologna Treat). Diverse in the approach, the model includes differentiating factors when compared to the project based traditional model. Through the development and conception of practical Interdisciplinary Projects, centring knowledges and techniques from the different Industrial Management and Engineering areas, we seek a new way of implementing the `Project Led Education' (PLE) bases, according to the Active Learning paradigm. This teaching/learning model aims to contribute to the Industrial Management and Engineering graduates' formation focused on a high level of performance and professional rectitude, to induce students' enthusiasm and motivation for acquiring scientific and technical knowledge, as well as to satisfy the diverse interest groups' expectations and promote the regional development.

  1. Program and Project Management Framework

    NASA Technical Reports Server (NTRS)

    Butler, Cassandra D.

    2002-01-01

    The primary objective of this project was to develop a framework and system architecture for integrating program and project management tools that may be applied consistently throughout Kennedy Space Center (KSC) to optimize planning, cost estimating, risk management, and project control. Project management methodology used in building interactive systems to accommodate the needs of the project managers is applied as a key component in assessing the usefulness and applicability of the framework and tools developed. Research for the project included investigation and analysis of industrial practices, KSC standards, policies, and techniques, Systems Management Office (SMO) personnel, and other documented experiences of project management experts. In addition, this project documents best practices derived from the literature as well as new or developing project management models, practices, and techniques.

  2. Student Teaching Centers: A Pilot Project. Report Number 3.

    ERIC Educational Resources Information Center

    Fischer, Stephen J.; Goddu, Roland J. B.

    Student Teaching Centers (STC) were established as a pilot project by Harvard University in cooperation with several public schools. The centers are directed by resident supervisors who are responsible for the supervision of student teachers, demonstration teaching of a limited number of classes in their respective fields, and, in some cases, the…

  3. Ace Project as a Project Management Tool

    ERIC Educational Resources Information Center

    Cline, Melinda; Guynes, Carl S.; Simard, Karine

    2010-01-01

    The primary challenge of project management is to achieve the project goals and objectives while adhering to project constraints--usually scope, quality, time and budget. The secondary challenge is to optimize the allocation and integration of resources necessary to meet pre-defined objectives. Project management software provides an active…

  4. How Project Managers Really Manage: An Indepth Look at Some Managers of Large, Complex NASA Projects

    NASA Technical Reports Server (NTRS)

    Mulenburg, Gerald M.; Impaeilla, Cliff (Technical Monitor)

    2000-01-01

    This paper reports on a research study by the author that examined ten contemporary National Aeronautics and Space Administration (NASA) complex projects. In-depth interviews with the project managers of these projects provided qualitative data about the inner workings of the project and the methodologies used in establishing and managing the projects. The inclusion of a variety of space, aeronautics, and ground based projects from several different NASA research centers helped to reduce potential bias in the findings toward any one type of project, or technical discipline. The findings address the participants and their individual approaches. The discussion includes possible implications for project managers of other large, complex, projects.

  5. Applying Agile Principles in Teaching Undergraduate Information Technology Project Management

    ERIC Educational Resources Information Center

    Budu, Joseph

    2018-01-01

    This article describes how the traditional teaching and learning activities over the years have been challenged to be agile--easily adaptable to changing classroom conditions. Despite this new phenomenon, there is a perceived paucity of agile-in-teaching research. Available studies neither focus on the use of agile principles beyond delivering…

  6. Orthogonal Projection in Teaching Regression and Financial Mathematics

    ERIC Educational Resources Information Center

    Kachapova, Farida; Kachapov, Ilias

    2010-01-01

    Two improvements in teaching linear regression are suggested. The first is to include the population regression model at the beginning of the topic. The second is to use a geometric approach: to interpret the regression estimate as an orthogonal projection and the estimation error as the distance (which is minimized by the projection). Linear…

  7. Project Management for International Development.

    ERIC Educational Resources Information Center

    Axelrod, Valija M.; Magisos, Joel H.

    A project developed a content model for international project management training. It also compiled a bibliography of project management references, identified specific project management training needs based upon a survey of international sponsors and contractor personnel, and documented the training needs of international project managers. Data…

  8. Project management process.

    DOT National Transportation Integrated Search

    2007-03-01

    This course provides INDOT staff with foundational knowledge and skills in project management principles and methodologies. INDOTs project management processes provide the tools for interdisciplinary teams to efficiently and effectively deliver pr...

  9. Project Manager Performance and the Decision to Backsource the Project Management Office

    ERIC Educational Resources Information Center

    Lively, William R.

    2014-01-01

    This paper reviews a management decision of an Information Technology Outsource (ITO) provider to backshore the management oversight of its Project Management Office (PMO) after only one year of offshore operations. Governance is a term used in project management to refer to management oversight. The review is a quantitative analysis of existing…

  10. Computer literacy enhancement in the Teaching Hospital Olomouc. Part I: project management techniques. Short communication.

    PubMed

    Sedlár, Drahomír; Potomková, Jarmila; Rehorová, Jarmila; Seckár, Pavel; Sukopová, Vera

    2003-11-01

    Information explosion and globalization make great demands on keeping pace with the new trends in the healthcare sector. The contemporary level of computer and information literacy among most health care professionals in the Teaching Hospital Olomouc (Czech Republic) is not satisfactory for efficient exploitation of modern information technology in diagnostics, therapy and nursing. The present contribution describes the application of two basic problem solving techniques (brainstorming, SWOT analysis) to develop a project aimed at information literacy enhancement.

  11. The Impact of Project Management Maturity upon IT/IS Project Management Outcomes

    ERIC Educational Resources Information Center

    Carcillo, Anthony Joseph, Jr.

    2013-01-01

    Although it is assumed that increasing the institutionalization (or maturity) of project management in an organization leads to greater project success, the literature has diverse views. The purpose of this mixed methods study was to examine the correlation between project management maturity and IT/IS project outcomes. The sample consisted of two…

  12. Teaching/Research Project "Wheelmap"

    NASA Astrophysics Data System (ADS)

    Gollenstede, Andreas

    2018-05-01

    In recent years new didactic concepts and approaches have been developed and evaluated at the universities. The concept for cartography lectures presented in this article is based on the close link of research and teaching/learning. The students are involved in all essential steps of a scientific project taking place during a series of lectures - beginning with the development of the scientific issues, followed by the choice and execution of the research methods and finally the presentation of the achieved outcomes. The specific project introduced here is based on self-experiments in which students took the perspective of wheelchair users entrusted with the task to map places, which are accessible for people with impairments. Among others, the goal set for the students was to develop an appropriate concept for the mobile acquisition of data and to visualise the final results by different methods of cartography.

  13. Developing Teaching Assistants' Skills in Positive Behaviour Management: An Application of Video Interaction Guidance in a Secondary School

    ERIC Educational Resources Information Center

    Hayes, Ben; Richardson, Sally; Hindle, Sarah; Grayson, Katy

    2011-01-01

    This paper reports an action research project in a school in the UK designed to investigate the impact of a brief Video Interaction Guidance (VIG) intervention in promoting skills of non-teaching staff in positive behaviour management. A summary of the literature in relation to VIG is provided before describing the project and data collected. Ten…

  14. How Does a Project Manager's Level of Development Influence Conceptualizations of Project Management and the Project Development Environment?

    ERIC Educational Resources Information Center

    Lynch, Margaret M.

    2013-01-01

    This study explores the meaning project managers (PMs) make of their project environment, how they lead their teams and have incorporate complexity into their project management approach. The exploration of the PM's developmental level and meaning making offers a different angle on the project management and leadership literature. The study…

  15. Teaching organization theory for healthcare management: three applied learning methods.

    PubMed

    Olden, Peter C

    2006-01-01

    Organization theory (OT) provides a way of seeing, describing, analyzing, understanding, and improving organizations based on patterns of organizational design and behavior (Daft 2004). It gives managers models, principles, and methods with which to diagnose and fix organization structure, design, and process problems. Health care organizations (HCOs) face serious problems such as fatal medical errors, harmful treatment delays, misuse of scarce nurses, costly inefficiency, and service failures. Some of health care managers' most critical work involves designing and structuring their organizations so their missions, visions, and goals can be achieved-and in some cases so their organizations can survive. Thus, it is imperative that graduate healthcare management programs develop effective approaches for teaching OT to students who will manage HCOs. Guided by principles of education, three applied teaching/learning activities/assignments were created to teach OT in a graduate healthcare management program. These educationalmethods develop students' competency with OT applied to HCOs. The teaching techniques in this article may be useful to faculty teaching graduate courses in organization theory and related subjects such as leadership, quality, and operation management.

  16. Constructivist Teaching Strategies: Projects in Teacher Education.

    ERIC Educational Resources Information Center

    Brown, Jessie C., Ed.; Adams, Arlene, Ed.

    This book provides information from experienced teachers on constructivist teaching, offering examples of preservice teachers' projects, lesson plans, and real-life advice. The 11 chapters are: (1) "Writing Case Studies: Constructing an Understanding of Student and Classroom" (Bettejim Cates); (2) "Educating Children Who are Racial…

  17. Teaching Strategic Management with a Business Game.

    ERIC Educational Resources Information Center

    Knotts, Ulysses S., Jr.; Keys, J. Bernard

    1997-01-01

    Management games are increasingly used to teaching strategic management by integrating functional areas of business and providing a working knowledge of the strategic management process. This article summarizes the experience of two veteran instructors, presenting course learning objectives, game pedagogy, team organization and management, game…

  18. Innovating Science Teaching by Participatory Action Research--Reflections from an Interdisciplinary Project of Curriculum Innovation on Teaching about Climate Change

    ERIC Educational Resources Information Center

    Feierabend, Timo; Eilks, Ingo

    2011-01-01

    This paper describes a three-year curriculum innovation project on teaching about climate change. The innovation for this study focused on a socio-critical approach towards teaching climate change in four different teaching domains (biology, chemistry, physics and politics). The teaching itself explicitly aimed at general educational objectives,…

  19. PRISM: Priority Symptom Management Project phase I: assessment.

    PubMed

    Ropka, M E; Spencer-Cisek, P

    2001-01-01

    To provide an overview of the process, goals, and outcome recommendations from the assessment phase of the Oncology Nursing Society's Priority Symptom Management (PRISM) project and to provide the foundation for a series of evidence-based practice and qualitative systematic review articles generated from the first phase of PRISM. Published articles, abstracts, and books; computerized databases; nonpublished research; personal communications; and proceedings of the PRISM summit meeting. Symptom management is a key component in quality cancer care. The assessment phase of PRISM yielded systematic reviews with an evidence-based framework to evaluate key symptoms, developed a framework for teaching and evaluating other symptoms, and recommended future ONS initiatives. Outcome recommendations from the PRISM summit targeted practice; professional and public education; research; and health policy. These activities provide background for subsequent evidence-based practice and qualitative systematic review articles that will focus on cancer symptom management.

  20. An Approach to Assess Knowledge and Skills in Risk Management through Project-Based Learning

    ERIC Educational Resources Information Center

    Galvao, Tulio Acacio Bandeira; Neto, Francisco Milton Mendes; Campos, Marcos Tullyo; Junior, Edson de Lima Cosme

    2012-01-01

    The increasing demand for Software Engineering professionals, particularly Project Managers, and popularization of the Web as a catalyst of human relations have made this platform interesting for training this type of professional. The authors have observed the widespread use of games as an attractive instrument in the process of teaching and…

  1. Using Focused Laboratory Management and Quality Improvement Projects to Enhance Resident Training and Foster Scholarship

    PubMed Central

    Ford, Bradley A.; Klutts, J. Stacey; Jensen, Chris S.; Briggs, Angela S.; Robinson, Robert A.; Bruch, Leslie A.; Karandikar, Nitin J.

    2017-01-01

    Training in patient safety, quality, and management is widely recognized as an important element of graduate medical education. These concepts have been intertwined in pathology graduate medical education for many years, although training programs face challenges in creating explicit learning opportunities in these fields. Tangibly involving pathology residents in management and quality improvement projects has the potential to teach and reinforce key concepts and further fulfill Accreditation Council for Graduate Medical Education goals for pursuing projects related to patient safety and quality improvement. In this report, we present our experience at a pathology residency program (University of Iowa) in engaging pathology residents in projects related to practical issues of laboratory management, process improvement, and informatics. In this program, at least 1 management/quality improvement project, typically performed during a clinical chemistry/management rotation, was required and ideally resulted in a journal publication. The residency program also initiated a monthly management/informatics series for pathology externs, residents, and fellows that covers a wide range of topics. Since 2010, all pathology residents at the University of Iowa have completed at least 1 management/quality improvement project. Many of the projects involved aspects of laboratory test utilization, with some projects focused on other areas such as human resources, informatics, or process improvement. Since 2012, 31 peer-reviewed journal articles involving effort from 26 residents have been published. Multiple projects resulted in changes in ongoing practice, particularly within the hospital electronic health record. Focused management/quality improvement projects involving pathology residents can result in both meaningful quality improvement and scholarly output. PMID:28913416

  2. Using Focused Laboratory Management and Quality Improvement Projects to Enhance Resident Training and Foster Scholarship.

    PubMed

    Krasowski, Matthew D; Ford, Bradley A; Klutts, J Stacey; Jensen, Chris S; Briggs, Angela S; Robinson, Robert A; Bruch, Leslie A; Karandikar, Nitin J

    2017-01-01

    Training in patient safety, quality, and management is widely recognized as an important element of graduate medical education. These concepts have been intertwined in pathology graduate medical education for many years, although training programs face challenges in creating explicit learning opportunities in these fields. Tangibly involving pathology residents in management and quality improvement projects has the potential to teach and reinforce key concepts and further fulfill Accreditation Council for Graduate Medical Education goals for pursuing projects related to patient safety and quality improvement. In this report, we present our experience at a pathology residency program (University of Iowa) in engaging pathology residents in projects related to practical issues of laboratory management, process improvement, and informatics. In this program, at least 1 management/quality improvement project, typically performed during a clinical chemistry/management rotation, was required and ideally resulted in a journal publication. The residency program also initiated a monthly management/informatics series for pathology externs, residents, and fellows that covers a wide range of topics. Since 2010, all pathology residents at the University of Iowa have completed at least 1 management/quality improvement project. Many of the projects involved aspects of laboratory test utilization, with some projects focused on other areas such as human resources, informatics, or process improvement. Since 2012, 31 peer-reviewed journal articles involving effort from 26 residents have been published. Multiple projects resulted in changes in ongoing practice, particularly within the hospital electronic health record. Focused management/quality improvement projects involving pathology residents can result in both meaningful quality improvement and scholarly output.

  3. Project Management Using Modern Guidance, Navigation and Control Theory

    NASA Technical Reports Server (NTRS)

    Hill, Terry R.

    2011-01-01

    Implementing guidance, navigation, and control (GN&C) theory principles and applying them to the human element of project management and control is not a new concept. As both the literature on the subject and the real-world applications are neither readily available nor comprehensive with regard to how such principles might be applied, this paper has been written to educate the project manager on the "laws of physics" of his or her project (not to teach a GN&C engineer how to become a project manager) and to provide an intuitive, mathematical explanation as to the control and behavior of projects. This paper will also address how the fundamental principles of modern GN&C were applied to the National Aeronautics and Space Administration's (NASA) Constellation Program (CxP) space suit project, ensuring the project was managed within cost, schedule, and budget. A project that is akin to a physical system can be modeled and managed using the same over arching principles of GN&C that would be used if that project were a complex vehicle, a complex system(s), or complex software with time-varying processes (at times nonlinear) containing multiple data inputs of varying accuracy and a range of operating points. The classic GN&C theory approach could thus be applied to small, well-defined projects; yet when working with larger, multiyear projects necessitating multiple organizational structures, numerous external influences, and a multitude of diverse resources, modern GN&C principles are required to model and manage the project. The fundamental principles of a GN&C system incorporate these basic concepts: State, Behavior, Feedback Control, Navigation, Guidance and Planning Logic systems. The State of a system defines the aspects of the system that can change over time; e.g., position, velocity, acceleration, coordinate-based attitude, and temperature, etc. The Behavior of the system focuses more on what changes are possible within the system; this is denoted in the state

  4. Research to Develop Effective Teaching and Management Techniques for Severely Disturbed and Retarded Children. Final Report.

    ERIC Educational Resources Information Center

    Kauffman, James M.; Birnbrauer, Jay S.

    The final report of a project on teaching and management techniques with severely disturbed and/or retarded children presents analysis of single subject research using contingent imitation of the child as an intervention technique. The effects of this technique were examined on the following behaviors: toyplay and reciprocal imitation, self…

  5. Enhancing Critical Thinking by Teaching Two Distinct Approaches to Management

    ERIC Educational Resources Information Center

    Dyck, Bruno; Walker, Kent; Starke, Frederick A.; Uggerslev, Krista

    2012-01-01

    The authors explore the effect on students' critical thinking of teaching only one approach to management versus teaching two approaches to management. Results from a quasiexperiment--which included a survey, interviews, and case analysis--suggest that compared with students who are taught only a conventional approach to management (which…

  6. Teaching Macro Practice: An Experiential Learning Project

    ERIC Educational Resources Information Center

    Carey, Lois A.

    2007-01-01

    This paper presents a model for teaching an undergraduate social work macro practice course utilizing an experiential learning paradigm. The model provides a campus-based project with social work majors in simultaneous dual roles of students and grassroots leaders, focusing on rape and sexual assault prevention training for college students. This…

  7. Using Replication Projects in Teaching Research Methods

    ERIC Educational Resources Information Center

    Standing, Lionel G.; Grenier, Manuel; Lane, Erica A.; Roberts, Meigan S.; Sykes, Sarah J.

    2014-01-01

    It is suggested that replication projects may be valuable in teaching research methods, and also address the current need in psychology for more independent verification of published studies. Their use in an undergraduate methods course is described, involving student teams who performed direct replications of four well-known experiments, yielding…

  8. An Analysis of Internally Funded Learning and Teaching Project Evaluation in Higher Education

    ERIC Educational Resources Information Center

    Huber, Elaine; Harvey, Marina

    2016-01-01

    Purpose: In the higher education sector, the evaluation of learning and teaching projects is assuming a role as a quality and accountability indicator. The purpose of this paper is to investigate how learning and teaching project evaluation is approached and critiques alignment between evaluation theory and practice. Design/Methodology/Approach:…

  9. Library Digitisation Project Management.

    ERIC Educational Resources Information Center

    Middleton, Michael

    Supervision of library digitization is the focus of this paper. First outlined are the definition, formalization, implementation, and completion phases of project management. Descriptions of management decisions involved in digitization projects follow on matters such as: collection analysis, resourcing, project personnel, production, access and…

  10. Managing Teaching and Learning in Further and Higher Education.

    ERIC Educational Resources Information Center

    Ashcroft, Kate; Foreman-Peck, Lorraine

    This book addresses the practical management of higher education teaching and learning as it is related to any subject. The volume stresses principles of the reflective practitioner model--open-mindedness, responsibility, and wholeheartedness. Chapter 1 introduces the book and its concept of teaching as a management process. Chapter 2 focuses on…

  11. RISK MANAGEMENT USING PROJECT RECON

    DTIC Science & Technology

    2016-11-28

    Risk Management Using Project Recon UNCLASSIFIED: Distribution Statement A. Approved for public release; distribution is unlimited. Bonnie Leece... Project Recon Lead What is Project Recon? • A web-based GOTS tool designed to capture, manage, and link Risks, Issues, and Opportunities in a...centralized database. • Project Recon (formerly Risk Recon) is designed to be used by all Program Management Offices, Integrated Project Teams and any

  12. Teaching Self-Management Strategies to Adolescents.

    ERIC Educational Resources Information Center

    Young, K. Richard; And Others

    This book presents a behavioral program to teach adolescents basic self-management skills; two chapters provide the theoretical basis for the program and four chapters supply sample lesson plans. The first chapter is an introduction to behavioral self-management. It proposes a behavior change model with four major components: assessment,…

  13. 7 CFR 3565.351 - Project management.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The lender...

  14. 7 CFR 3565.351 - Project management.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 15 2012-01-01 2012-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The lender...

  15. 7 CFR 3565.351 - Project management.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 15 2013-01-01 2013-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The lender...

  16. 7 CFR 3565.351 - Project management.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 15 2014-01-01 2014-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The lender...

  17. 7 CFR 3565.351 - Project management.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 15 2011-01-01 2011-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The lender...

  18. Adapting Project Management Practices to Research-Based Projects

    NASA Technical Reports Server (NTRS)

    Bahr, P.; Baker, T.; Corbin, B.; Keith, L.; Loerch, L.; Mullenax, C.; Myers, R.; Rhodes, B.; Skytland, N.

    2007-01-01

    From dealing with the inherent uncertainties in outcomes of scientific research to the lack of applicability of current NASA Procedural Requirements guidance documentation, research-based projects present challenges that require unique application of classical project management techniques. If additionally challenged by the creation of a new program transitioning from basic to applied research in a technical environment often unfamiliar with the cost and schedule constraints addressed by project management practices, such projects can find themselves struggling throughout their life cycles. Finally, supplying deliverables to a prime vehicle customer, also in the formative stage, adds further complexity to the development and management of research-based projects. The Biomedical Research and Countermeasures Projects Branch at NASA Johnson Space Center encompasses several diverse applied research-based or research-enabling projects within the newly-formed Human Research Program. This presentation will provide a brief overview of the organizational structure and environment in which these projects operate and how the projects coordinate to address and manage technical requirements. We will identify several of the challenges (cost, technical, schedule, and personnel) encountered by projects across the Branch, present case reports of actions taken and techniques implemented to deal with these challenges, and then close the session with an open forum discussion of remaining challenges and potential mitigations.

  19. Practical Teaching & Learning Model: A Modern Dimension for Business Management Schools

    ERIC Educational Resources Information Center

    Kolachi, Nadir Ali

    2013-01-01

    Purpose: The purpose of this research is to evaluate and investigate the most suitable model required for teaching business Management curriculum. The paper will report a new dimension of Business Management Teaching. For this purpose, a Practical teaching & Learning Model has been prepared and will be discussed through qualitative research…

  20. Teaching a Systems Approach: An Innovative Quality Improvement Project.

    PubMed

    Hamrin, Vanya; Vick, Rose; Brame, Cynthia; Simmons, Megan; Smith, Letizia; Vanderhoef, Dawn

    2016-04-01

    Nurse practitioners are required to navigate complex health care systems. Quality improvement (QI) projects provide the opportunity for nurse practitioner students to learn systems knowledge and improve health care outcomes in patient populations. A gap in the literature exists around how to systematically teach, apply, and measure QI curricular objectives at the master's level. Six faculty evaluated the QI project for the psychiatric nurse practitioner master's program by identifying the most challenging QI concepts for students to apply, revising their teaching strategies to address gaps, and retrospectively evaluating the outcomes of these curriculum changes by comparing student outcomes before and after the curricular changes. A significant difference was noted on QI project performance between students in the 2014 and 2015 graduating classes, measured by the scores earned on students' final papers (t[92] = 1.66, p = .05, d = .34, r(2) = .0289). Theoretical principles of adult and cooperative learning were used to inform curricular changes to enhance student's acquisition of QI skills. Copyright 2016, SLACK Incorporated.

  1. Teaching as Improvisational Experience: Student Music Teachers' Reflections on Learning during an Intercultural Project

    ERIC Educational Resources Information Center

    Westerlund, Heidi; Partti, Heidi; Karlsen, Sidsel

    2015-01-01

    This qualitative instrumental case study explores Finnish student music teachers' experiences of teaching and learning as participants in an intercultural project in Cambodia. The Multicultural Music University project aimed at increasing master's level music education students' intercultural competencies by providing experiences of teaching and…

  2. The Integration of Project-Based Methodology into Teaching in Machine Translation

    ERIC Educational Resources Information Center

    Madkour, Magda

    2016-01-01

    This quantitative-qualitative analytical research aimed at investigating the effect of integrating project-based teaching methodology into teaching machine translation on students' performance. Data was collected from the graduate students in the College of Languages and Translation, at Imam Muhammad Ibn Saud Islamic University, Riyadh, Saudi…

  3. Project management: importance for diagnostic laboratories.

    PubMed

    Croxatto, A; Greub, G

    2017-07-01

    The need for diagnostic laboratories to improve both quality and productivity alongside personnel shortages incite laboratory managers to constantly optimize laboratory workflows, organization, and technology. These continuous modifications of the laboratories should be conducted using efficient project and change management approaches to maximize the opportunities for successful completion of the project. This review aims at presenting a general overview of project management with an emphasis on selected critical aspects. Conventional project management tools and models, such as HERMES, described in the literature, associated personal experience, and educational courses on management have been used to illustrate this review. This review presents general guidelines of project management and highlights their importance for microbiology diagnostic laboratories. As an example, some critical aspects of project management will be illustrated with a project of automation, as experienced at the laboratories of bacteriology and hygiene of the University Hospital of Lausanne. It is important to define clearly beforehand the objective of a project, its perimeter, its costs, and its time frame including precise duration estimates of each step. Then, a project management plan including explanations and descriptions on how to manage, execute, and control the project is necessary to continuously monitor the progression of a project to achieve its defined goals. Moreover, a thorough risk analysis with contingency and mitigation measures should be performed at each phase of a project to minimize the impact of project failures. The increasing complexities of modern laboratories mean clinical microbiologists must use several management tools including project and change management to improve the outcome of major projects and activities. Copyright © 2017 The Author(s). Published by Elsevier Ltd.. All rights reserved.

  4. Collaborative Teaching and Learning through Multi-Institutional Integrated Group Projects

    ERIC Educational Resources Information Center

    Long, Suzanna K.; Carlo, Héctor J.

    2013-01-01

    This teaching brief describes an innovative multi-institutional initiative through which integrated student groups from different courses collaborate on a common course project. In this integrated group project, students are asked to design a decentralized manufacturing organization for a company that will manufacture industrial Proton-Exchange…

  5. Learning by Teaching: Implementation of a Multimedia Project in Astro 101

    NASA Astrophysics Data System (ADS)

    Perrodin, D.; Lommen, A.

    2011-09-01

    Astro 101 students have deep-seated pre-conceptions regarding such topics as the cause of moon phases or the seasons. Beyond exploring the topics in a learner-centered fashion, the "learning by teaching" philosophy enables students to truly master concepts. In order to make students teach the cause of moon phases, we created a multimedia project where groups of students taught other students and filmed the session. They were to produce a 10-minute final movie highlighting their teaching techniques and showing students in the process of learning the concepts. This "experiment" turned out to be a great success for a few reasons. First, students gained experience explaining conceptually-challenging topics, making them learn the material better. Additionally, they learned to apply learner-centered techniques, most likely learning to teach for the first time. Finally, this project provided the students a connection between the classroom and the rest of the college, making them responsible for applying and sharing their knowledge with their peers.

  6. Non-Profit/Higher Education Project Management Series: Project Management (PM) Foundations

    ERIC Educational Resources Information Center

    Burgher, Karl E.; Snyder, Michael B.

    2012-01-01

    This is the first in a series of forum articles on applying project management (PM) techniques and tools to the nonprofit sector with a focus on higher education. The authors will begin with a traditional look at project management because they believe that the integration of the tools and the processes associated with PM into many campus offices…

  7. NICA project management information system

    NASA Astrophysics Data System (ADS)

    Bashashin, M. V.; Kekelidze, D. V.; Kostromin, S. A.; Korenkov, V. V.; Kuniaev, S. V.; Morozov, V. V.; Potrebenikov, Yu. K.; Trubnikov, G. V.; Philippov, A. V.

    2016-09-01

    The science projects growth, changing of the efficiency criteria during the project implementation require not only increasing of the management specialization level but also pose the problem of selecting the effective planning methods, monitoring of deadlines and interaction of participants involved in research projects. This paper is devoted to choosing the project management information system for the new heavy-ion collider NICA (Nuclotron based Ion Collider fAcility). We formulate the requirements for the project management information system with taking into account the specifics of the Joint Institute for Nuclear Research (JINR, Dubna, Russia) as an international intergovernmental research organization, which is developed on the basis of a flexible and effective information system for the NICA project management.

  8. Outcomes associated with community-based research projects in teaching undergraduate public health.

    PubMed

    Bouhaimed, Manal; Thalib, Lukman; Doi, Suhail A R

    2008-01-01

    Community based research projects have been widely used in teaching public health in many institutions. Nevertheless, there is a paucity of information on the learning outcomes of such a teaching strategy. We therefore attempted to evaluate our experience with such a project based teaching process. The objective of this study was to evaluate the factors related to quality, impact and relevance of a 6-week student project for teaching public health in the faculty of medicine at Kuwait University. Interactive sessions familiarized students with research methods. Concurrently, they designed and completed a participatory project with a Community Medicine mentor. Questionnaires were used to assess quality, impact and relevance of the project, and these were correlated with multiple demographic, statistical and research design factors. We evaluated a total of 104 projects that were completed during the period of September 2001 to June 2006. Three dimensions of outcome were assessed: quality; impact and relevance. The average (mean + SE; maximum of 5) scores across all projects were 2.6 + 0.05 (range 1.7-3.7) for quality, 2.8 + 0.06 (range 1.7-4.3) for impact and 3.3 + 0.08 (range 1.3-5) for relevance. The analysis of the relationship between various factors and the scores on each dimension of assessment revealed that various factors were associated with improved quality, impact or relevance to public health practice. We conclude that use of more objective measurement instruments with better a priori conceptualization along with appropriate use of statistics and a more developed study design were likely to result in more meaningful research outcomes. We also found that a biostatistics or epidemiology mentor improved the research outcome.

  9. The Project Manager Who Saved His Country

    NASA Technical Reports Server (NTRS)

    Baniszewski, John

    2008-01-01

    George Meade defeated Robert E. Lee, one of the greatest military leaders of all time. How did he do it? By using the skills he had learned as a project manager and outperforming Lee in all aspects of project management. Most project managers are familiar with the Project Management Institute's "Guide to the Project Management Body of Knowledge" (PMBOK), which identifies the skills and knowledge crucial to successful project management. Project managers need to make sure that all the elements of a project work together. They must develop and execute plans and coordinate changes to those plans. A project manager must define the scope of the work, break it into manageable pieces, verify and control what work is being done, and make sure that the work being done is essential to the project. Every project manager knows the challenges of schedule and the value of schedule slack. Project managers must get the resources they need and use them effectively. Project managers get the people they need and use their talents to achieve mission success. Projects generate huge amounts of information. A key to project success is getting sufficient and accurate information to the people who need it when they need it. Project managers must identify and quantify the risks that jeopardize project success and make plans for dealing with them. Studying Meade and Lee's performances at Gettysburg can help modern project managers appreciate, develop, and use the skills they need to be good project managers. The circumstances may be different, but the basic principles are the same. This dramatic event in American history shows how the skills of project management can be used in almost any situation. Former project manager George Meade used those skills to change the tide of the Civil War.

  10. Project TIMS (Teaching Integrated Math/Science)

    NASA Technical Reports Server (NTRS)

    Edwards, Leo, Jr.

    1993-01-01

    The goal of this project is to increase the scientific knowledge and appreciation bases and skills of pre-service and in-service middle school teachers, so as to impact positively on teaching, learning, and student retention. This report lists the objectives and summarizes the progress thus far. Included is the working draft of the TIMS (Teaching Integrated Math/Science) curriculum outline. Seven of the eight instructional subject-oriented modules are also included. The modules include informative materials and corresponding questions and educational activities in a textbook format. The subjects included here are the universe and stars; the sun and its place in the universe; our solar system; astronomical instruments and scientific measurements; the moon and eclipses; the earth's atmosphere: its nature and composition; and the earth: directions, time, and seasons. The module not included regards winds and circulation.

  11. Preparing Biology Teachers to Teach Evolution in a Project-Based Approach

    ERIC Educational Resources Information Center

    Cook, Kristin; Buck, Gayle; Park Rogers, Meredith

    2012-01-01

    This study investigates a project-based learning (PBL) approach to teaching evolution to inform efforts in teacher preparation. Data analysis of a secondary biology educator teaching evolution through a PBL approach illuminated: (1) active student voice, which allowed students to reflect on their positioning on evolution and consider multiple…

  12. Defining the structure of undergraduate medical leadership and management teaching and assessment in the UK.

    PubMed

    Stringfellow, Thomas D; Rohrer, Rebecca M; Loewenthal, Lola; Gorrard-Smith, Connor; Sheriff, Ibrahim H N; Armit, Kirsten; Lees, Peter D; Spurgeon, Peter C

    2014-10-10

    Abstract Medical leadership and management (MLM) skills are essential in preventing failings of healthcare; it is unknown how these attitudes can be developed during undergraduate medical education. This paper aims to quantify interest in MLM and recommends preferred methods of teaching and assessment at UK medical schools. Two questionnaires were developed, one sent to all UK medical school faculties, to assess executed and planned curriculum changes, and the other sent to medical students nationally to assess their preferences for teaching and assessment. Forty-eight percent of UK medical schools and 260 individual student responses were recorded. Student responses represented 60% of UK medical schools. 65% of schools valued or highly valued the importance of teaching MLM topics, compared with 93.2% of students. Students' favoured teaching methods were seminars or lectures (89.4%) and audit and quality improvement (QI) projects (77.8%). Medical schools preferred portfolio entries (55%) and presentations (35%) as assessment methods, whilst simulation exercises (76%) and audit reports (61%) were preferred by students. Preferred methods encompass experiential learning or simulation and a greater emphasis should be placed on encouraging student audit and QI projects. The curriculum changes necessary could be achieved via further integration into future editions of Tomorrow's Doctors.

  13. Managing Projects with KPRO

    NASA Technical Reports Server (NTRS)

    Braden, Barry M.

    2004-01-01

    How does a Project Management Office provide: Consistent, familiar, easily used scheduling tools to Project Managers and project team members? Provide a complete list of organization resources available for use on the project? Facilitate resource tracking and visibility? Provide the myriad reports that the organization requires? Facilitate consistent budget planning and cost performance information? Provide all of this to the entire organization? Provide for the unique requirement of the organization? and get people to use it? Answer: Implementation of the Kennedy space Center Projects and Resources Online (KPRO), a modified COTS solution.

  14. 44 CFR 206.438 - Project management.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Project management. 206.438 Section 206.438 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF... Project management. (a) General. The State serving as grantee has primary responsibility for project...

  15. 44 CFR 206.438 - Project management.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false Project management. 206.438 Section 206.438 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF... Project management. (a) General. The State serving as grantee has primary responsibility for project...

  16. 44 CFR 206.438 - Project management.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false Project management. 206.438 Section 206.438 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF... Project management. (a) General. The State serving as grantee has primary responsibility for project...

  17. 44 CFR 206.438 - Project management.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 44 Emergency Management and Assistance 1 2013-10-01 2013-10-01 false Project management. 206.438 Section 206.438 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF... Project management. (a) General. The State serving as grantee has primary responsibility for project...

  18. 44 CFR 206.438 - Project management.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 44 Emergency Management and Assistance 1 2012-10-01 2011-10-01 true Project management. 206.438 Section 206.438 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF... Project management. (a) General. The State serving as grantee has primary responsibility for project...

  19. The Project Manager's Tool Kit

    NASA Technical Reports Server (NTRS)

    Cameron, W. Scott

    2003-01-01

    Project managers are rarely described as being funny. Moreover, a good sense of humor rarely seems to be one of the deciding factors in choosing someone to be a project manager, or something that pops up as a major discussion point at an annual performance review. Perhaps this is because people think you aren't serious about your work if you laugh. I disagree with this assessment, but that's not really my point. As I talk to people either pursuing a career in project management, or broadening their assignment to include project management, I encourage them to consider what tools they need to be successful. I suggest that they consider any strength they have to be part of their Project Management (PM) Tool Kit, and being funny could be one of the tools they need.

  20. Working with Teachers to Develop Fair and Reliable Measures of Effective Teaching. MET Project

    ERIC Educational Resources Information Center

    Bill & Melinda Gates Foundation, 2010

    2010-01-01

    In fall 2009, the Bill & Melinda Gates Foundation launched the Measures of Effective Teaching (MET) project to develop and test multiple measures of teacher effectiveness. The goal of the MET project is to improve the quality of information about teaching effectiveness available to education professionals within states and districts--information…

  1. Lessons Learned from Client Projects in an Undergraduate Project Management Course

    ERIC Educational Resources Information Center

    Pollard, Carol E.

    2012-01-01

    This work proposes that a subtle combination of three learning methods offering "just in time" project management knowledge, coupled with hands-on project management experience can be particularly effective in producing project management students with employable skills. Students were required to apply formal project management knowledge to gain…

  2. Effective Classroom-Management & Positive Teaching

    ERIC Educational Resources Information Center

    Sieberer-Nagler, Katharina

    2016-01-01

    This article offers practical information for primary teachers to become more knowledgable, skilled and effective in their work. Aspects of positive teaching and learning are explored. Innovative methods for transforming common classroom management struggles into opportunities for positive change and for changing negative behaviors into positive…

  3. The EarthKAM project: creating space imaging tools for teaching and learning

    NASA Astrophysics Data System (ADS)

    Dodson, Holly; Levin, Paula; Ride, Sally; Souviney, Randall

    2000-07-01

    The EarthKAM Project is a NASA-supported partnership of secondary and university students with Earth Science and educational researchers. This report describes an ongoing series of activities that more effectively integrate Earth images into classroom instruction. In this project, students select and analyze images of the Earth taken during Shuttle flights and use the tools of modern science (computers, data analysis tools and the Internet) to disseminate the images and results of their research. A related study, the Visualizing Earth Project, explores in greater detail the cognitive aspects of image processing and the educational potential of visualizations in science teaching and learning. The content and organization of the EarthKAM datasystem of images and metadata are also described. An associated project is linking this datasystem of images with the Getty Thesaurus of Geographic Names, which will allow users to access a wide range of geographic and political information for the regions shown in EarthKAM images. Another project will provide tools for automated feature extraction from EarthKAM images. In order to make EarthKAM resources available to a larger number of schools, the next important goal is to create an integrated datasystem that combines iterative resource validation and publication, with multimedia management of instructional materials.

  4. Experiencing Teaching and Learning Quantitative Reasoning in a Project-Based Context

    ERIC Educational Resources Information Center

    Muir, Tracey; Beswick, Kim; Callingham, Rosemary; Jade, Katara

    2016-01-01

    This paper presents the findings of a small-scale study that investigated the issues and challenges of teaching and learning about quantitative reasoning (QR) within a project-based learning (PjBL) context. Students and teachers were surveyed and interviewed about their experiences of learning and teaching QR in that context in contrast to…

  5. Online vs live methods for teaching difficult airway management to anesthesiology residents.

    PubMed

    Bello, Giuseppe; Pennisi, Mariano Alberto; Maviglia, Riccardo; Maggiore, Salvatore Maurizio; Bocci, Maria Grazia; Montini, Luca; Antonelli, Massimo

    2005-04-01

    To compare the effectiveness of traditional and online teaching methods for educating anesthesiology residents in the principles and practice of difficult airway management. Prospective, randomized, controlled trial. University hospital. Two randomly selected groups, each containing 28 physicians enrolled from among residents in Anesthesiology and Intensive Care Medicine in Italy. Residents in Group 1 took a traditional 5-h course on the principles and practice of airway management, which included lectures, slide projection, and dummy demonstrations. The same material was presented to Group 2 in an exclusively online format, which could be individually accessed for a period of 36 h. In the online course, student-instructor interaction was provided through threaded discussion forums during three 30-min real-time question-and-answer sessions. Differences in baseline and post-course scores on written tests and practical skills tests were measured. Knowledge gains in Group 2 were slightly, but not significantly, greater compared with Group 1 both in written (P=0.228) and practical skills (P=0.376) tests. Semi-quantitative ratings of learner satisfaction were significantly higher in the online group (P=0.014). Almost all online students (93%) were logged in for at least 45 of the 90 min of real-time question-and-answer sessions. The four instructors spent an average of 144+/-10 min preparing answers and interacting with online students. Online teaching formats may be a valid alternative for teaching residents the principles and practice of difficult airway management. Interaction with instructors seems to be an important element, but it may require substantial time commitments by instructors.

  6. Educational Project Management Instructional System. Module One. Project Management Executive Orientation.

    ERIC Educational Resources Information Center

    Cummings, C. Peter; Cook, Desmond L.

    This module is the first in a self-instructional program designed to train public school personnel in how to manage educational projects. These may include federally funded projects (such as Title I projects), court-ordered programs (such as a desegregation plan), or locally initiated projects (such as a new math program). The purpose of this…

  7. Primary teachers conducting inquiry projects: effects on attitudes towards teaching science and conducting inquiry

    NASA Astrophysics Data System (ADS)

    van Aalderen-Smeets, Sandra I.; Walma van der Molen, Juliette H.; van Hest, Erna G. W. C. M.; Poortman, Cindy

    2017-01-01

    This study used an experimental, pretest-posttest control group design to investigate whether participation in a large-scale inquiry project would improve primary teachers' attitudes towards teaching science and towards conducting inquiry. The inquiry project positively affected several elements of teachers' attitudes. Teachers felt less anxious about teaching science and felt less dependent on contextual factors compared to the control group. With regard to attitude towards conducting inquiry, teachers felt less anxious and more able to conduct an inquiry project. There were no effects on other attitude components, such as self-efficacy beliefs or relevance beliefs, or on self-reported science teaching behaviour. These results indicate that practitioner research may have a partially positive effect on teachers' attitudes, but that it may not be sufficient to fully change primary teachers' attitudes and their actual science teaching behaviour. In comparison, a previous study showed that attitude-focused professional development in science education has a more profound impact on primary teachers' attitudes and science teaching behaviour. In our view, future interventions aiming to stimulate science teaching should combine both approaches, an explicit focus on attitude change together with familiarisation with inquiry, in order to improve primary teachers' attitudes and classroom practices.

  8. Building Excellence in Project Execution: Integrated Project Management

    DTIC Science & Technology

    2015-04-30

    challenge by adopting and refining the CMMI Model and building the tenets of integrated project management (IPM) into project planning and execution...Systems Center Pacific (SSC Pacific) is addressing this challenge by adopting and refining the CMMI Model, and building the tenets of integrated project...successfully managing stakeholder expectations and meeting requirements. Under the Capability Maturity Model Integration ( CMMI ), IPM is defined as

  9. Tools for Teaching Virtual Teams: A Comparative Resource Review

    ERIC Educational Resources Information Center

    Larson, Barbara; Leung, Opal; Mullane, Kenneth

    2017-01-01

    As the ubiquity of virtual work--and particularly virtual project teams--increases in the professional environment, management and other professional programs are increasingly teaching students skills related to virtual work. One of the most common forms of teaching virtual work skills is a virtual team project, in which students collaborate with…

  10. Agile Project Management for e-Learning Developments

    ERIC Educational Resources Information Center

    Doherty, Iain

    2010-01-01

    We outline the project management tactics that we developed in praxis in order to manage elearning projects and show how our tactics were enhanced through implementing project management techniques from a formal project management methodology. Two key factors have contributed to our project management success. The first is maintaining a clear…

  11. Relationship between time management in construction industry and project management performance

    NASA Astrophysics Data System (ADS)

    Nasir, Najuwa; Nawi, Mohd Nasrun Mohd; Radzuan, Kamaruddin

    2016-08-01

    Nowadays, construction industry particularly in Malaysia struggle in achieving status of eminent time management for construction project. Project managers have a great responsibility to keep the project success under time of project completion. However, studies shows that delays especially in Malaysian construction industry still unresolved due to weakness in managing the project. In addition, quality of time management on construction projects is generally poor. Due to the progressively extended delays issue, time performance becomes an important subject to be explored to investigate delay factors. The method of this study is review of literature towards issues in construction industry which affecting time performance of project in general by focusing towards process involved for project management. Based on study, it was found that knowledge, commitment, cooperation are the main criteria as an overall to manage the project into a smooth process during project execution until completion. It can be concluded that, the strength between project manager and team members in these main criteria while conducting the project towards good time performance is highly needed. However, there is lack of establishment towards factors of poor time performance which strongly related with project management. Hence, this study has been conducted to establish factors of poor time performance and its relations with project management.

  12. Affective Teaching: A Method to Enhance Classroom Management

    ERIC Educational Resources Information Center

    Shechtman, Zipora; Leichtentritt, Judy

    2004-01-01

    The purpose of the study was to enhance classroom management in special education classrooms. "Affective teaching" was compared with "cognitive teaching" in 52 classrooms in Israel. Data was collected based on observations of three 90 minute lessons, equally divided into the two types of instruction. Results of MANOVA…

  13. Casimage project: a digital teaching files authoring environment.

    PubMed

    Rosset, Antoine; Muller, Henning; Martins, Martina; Dfouni, Natalia; Vallée, Jean-Paul; Ratib, Osman

    2004-04-01

    The goal of the Casimage project is to offer an authoring and editing environment integrated with the Picture Archiving and Communication Systems (PACS) for creating image-based electronic teaching files. This software is based on a client/server architecture allowing remote access of users to a central database. This authoring environment allows radiologists to create reference databases and collection of digital images for teaching and research directly from clinical cases being reviewed on PACS diagnostic workstations. The environment includes all tools to create teaching files, including textual description, annotations, and image manipulation. The software also allows users to generate stand-alone CD-ROMs and web-based teaching files to easily share their collections. The system includes a web server compatible with the Medical Imaging Resource Center standard (MIRC, http://mirc.rsna.org) to easily integrate collections in the RSNA web network dedicated to teaching files. This software could be installed on any PACS workstation to allow users to add new cases at any time and anywhere during clinical operations. Several images collections were created with this tool, including thoracic imaging that was subsequently made available on a CD-Rom and on our web site and through the MIRC network for public access.

  14. Teaching residents practice-management knowledge and skills: an in vivo experience.

    PubMed

    Williams, Laurel Lyn

    2009-01-01

    This article explores the relevant data regarding teaching psychiatric residents practice management knowledge and skills. This article also introduces a unique program for teaching practice management to residents. A literature search was conducted through PubMed and Academic Psychiatry. Additionally residents involved in the training program for practice management were given an anonymous survey to complete. There were no randomized, controlled trials in the academic psychiatric field concerning the topic of practice management. The responses to the resident survey (n=10) indicated a modest improvement in residents' perception of receiving adequate training and exposure to practice management knowledge and skills. The available research suggests that many residents and faculty believe that practice management knowledge and skills are still not adequately addressed. The Baylor Clinic practice management program may be one possible solution for integrating the teaching of practice management knowledge and skills. More research on this topic is needed.

  15. Employing Wikibook Project in a Linguistics Course to Promote Peer Teaching and Learning

    ERIC Educational Resources Information Center

    Wang, Lixun

    2016-01-01

    Peer teaching and learning are learner-centred approaches with great potential for promoting effective learning, and the fast development of Web 2.0 technology has opened new doors for promoting peer teaching and learning. In this study, we aim to establish peer teaching and learning among students by employing a Wikibook project in the course…

  16. Pre-School Foreign Language Teaching and Learning--A Network Innovation Project in Slovenia

    ERIC Educational Resources Information Center

    Brumen, Mihaela; Berro, Fanika Fras; Cagran, Branka

    2017-01-01

    The paper describes some findings about teaching foreign languages (FL) in a pre-school setting obtained from the Network Innovation Project (NIP). The aims of the NIP were to research and practise the most effective teaching approaches and organizational models in teaching and learning of FL in pre-schools. The objectives were to determine how…

  17. Competency model for the project managers of technical projects

    NASA Astrophysics Data System (ADS)

    Duncan, William R.

    1992-05-01

    Traditional job description techniques were developed to support compensation decisions for hourly wage earners in a manufacturing environment. Their resultant focus on activities performed on the job works well in this environment where the ability to perform the activity adequately is objectively verifiable by testing and observation. Although many organizations have adapted these techniques for salaried employees and service environments, the focus on activities performed has never been satisfactory. For example, stating that a project manager `prepares regular project status reports' tells us little about what to look for in a potential project manager or how to determine if a practicing project manager is ready for additional responsibilities. The concept of a `competency model' has been developed within the last decade to address this shortcoming. Competency models focus on what skills are needed to perform the tasks defined by the job description. For example, a project manager must be able to communicate well both orally and in writing in order to `prepare regular project status reports.'

  18. Performance of Clinical Nurse Educators in Teaching Pharmacology and Medication Management: Nursing Students' Perceptions.

    PubMed

    Ghamari Zare, Zohre; Adib-Hajbaghery, Mohsen

    2016-03-01

    Pharmacological knowledge and medication management skills of student nurses greatly depend on the clinical nurse educators' performance in this critical issue. However, the Iranian nurse educators' performance in teaching pharmacology and medication management are not adequately studied. The current study aimed to investigate the nursing students' perceptions on the status of clinical pharmaceutical and medication management education. A cross-sectional study was conducted on all 152 nursing students registered in the seventh and eighth semesters at the Qom and Naragh branches of Islamic Azad University, and Kashan University of Medical Sciences in 2013 - 2014 academic year. The students' perceptions on the performance of clinical nurse educators in teaching pharmacology and medication management were assessed using a researcher made questionnaire. The questionnaire consisted of 31 items regarding clinical educators' performance in teaching pharmacology and medication management and two questions about students' satisfaction with their level of knowledge and skills in pharmacology and medication management. Descriptive statistics was employed and analysis of variance was performed to compare the mean of scores of teaching pharmacology and medication management in the three universities. Among a total of 152 subjects, 82.9% were female and their mean age was 22.57 ± 1.55 years. According to the students, instructors had the weakest performance in the three items of teaching pharmacology and medication management based on the students' learning needs, teaching medication management through a patient-centered method and teaching pharmacology and medication management based on the course plan. The students' satisfaction regarding their own knowledge and skill of pharmacology and medication management was at medium level. Nursing students gave a relatively low score in several aspects of their instructors' performance regarding teaching pharmacology and medication

  19. Designing Effective Projects: Decision Options for Maximizing Learning and Project Success

    ERIC Educational Resources Information Center

    Volkema, Roger J.

    2010-01-01

    In recent years, more and more business schools have introduced team-based projects into their curricula as a means of addressing corporate, small business, and community-service issues while teaching students a variety of project management skills (technical and sociocultural). In designing a project-oriented course, an instructor has a number of…

  20. Teaching Managers How to Manage

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hylko, J.M.

    2006-07-01

    Following graduation from a college or university with a technical degree, or through years of experience, an individual's training and career development activities typically focus on enhancing technical problem-solving skills. However, as these technical professionals, herein referred to as 'Techies', advance throughout their careers, they may be required to accept and adapt to the role of being a manager, and must undergo a transition to learn and rely on new problem-solving skills. However, unless a company has a specific manager-trainee class to address this subject and develop talent from within, an employee's management style is learned and developed 'on themore » job'. Both positive and negative styles are nurtured by those managers having similar qualities. Unfortunately, a negative style often contributes to the deterioration of employee morale and ultimate closing of a department or company. This paper provides the core elements of an effective management training program for 'Teaching Managers How to Manage' derived from the Department of Energy's Integrated Safety Management System and the Occupational Safety and Health Administration 's Voluntary Protection Program. Discussion topics and real-life examples concentrate on transitioning an employee from a 'Techie' to a manager; common characteristics of being a manager; the history and academic study of management; competition, change and the business of waste management; what to do after taking over a department by applying Hylko's Star of Success; command media; the formal and informal organizational charts; chain of command; hiring and developing high-degree, autonomous employees through effective communication and delegation; periodic status checks; and determining if the program is working successfully. These common characteristics of a strong management/leadership culture and practical career tips discussed herein provide a solid foundation for any company or department that is serious about

  1. Critical Reflexive Practice in Teaching Management Communication

    ERIC Educational Resources Information Center

    Holmes, Prue; Cockburn-Wootten, Cheryl; Motion, Judith; Zorn, Theodore E.; Roper, Juliet

    2005-01-01

    Critical theory has been a distinguishing feature of the communication research program at the Waikato Management School, but significant reflection is required to translate the theory into meaningful classroom experiences. The need for reflection comes from two key tensions in teaching management communication: One is the tension between teaching…

  2. Teaching Small Business Ownership and Management

    ERIC Educational Resources Information Center

    Leach, James A.

    1977-01-01

    Topics discussed include integrating small business ownership with existing programs; establishing awareness, exploration, and orientation activities; and preparation for small business ownership. A curriculum guide developed for teaching small business ownership and management is also described. (TA)

  3. Project management of life-science research projects: project characteristics, challenges and training needs.

    PubMed

    Beukers, Margot W

    2011-02-01

    Thirty-four project managers of life-science research projects were interviewed to investigate the characteristics of their projects, the challenges they faced and their training requirements. A set of ten discriminating parameters were identified based on four project categories: contract research, development, discovery and call-based projects--projects set up to address research questions defined in a call for proposals. The major challenges these project managers are faced with relate to project members, leadership without authority and a lack of commitment from the respective organization. Two-thirds of the project managers indicated that they would be interested in receiving additional training, mostly on people-oriented, soft skills. The training programs that are currently on offer, however, do not meet their needs. Copyright © 2010 Elsevier Ltd. All rights reserved.

  4. Teaching Residents Practice-Management Knowledge and Skills: An "in Vivo" Experience

    ERIC Educational Resources Information Center

    Williams, Laurel Lyn

    2009-01-01

    Objective: This article explores the relevant data regarding teaching psychiatric residents practice management knowledge and skills. This article also introduces a unique program for teaching practice management to residents. Methods: A literature search was conducted through PubMed and "Academic Psychiatry". Additionally residents…

  5. Should Project Managers Buy Technical Data

    DTIC Science & Technology

    2017-04-06

    Should Project Managers Buy Technical Data? Jerry Harper April 6, 2017 PUBLISHED BY The Defense...intellectual property (IP) management and technical data rights (TDR) strategies. According to DoD Instruction 5000.02 (DoD, 2017), project managers (PMs...Defense Authorization Act NDI ................nondevelopmental item PM ................. project manager R&D ...............research and development

  6. Female Project Managers' Workplace Problems: a Survey

    NASA Astrophysics Data System (ADS)

    Duong, Thuong Thi; Skitmore, Martin

    This article examines the extent to which challenges in the workplace may cause female project managers to be in a significantly small minority. A survey of members of the Australian Institute of Project Management in Queensland is described. This compares the experiences and observations of both men and women on various issues related to technical and gender aspects in project management workplaces. The results show that although female project managers experience many problems, male project managers also experience most of the same problems. Likewise, there are also few differences between more and less experience, the level of management, and types of industries. The differences that do occur involve discrimination against women in general, differences in project management styles, and support from other project managers.

  7. Evaluation of the Bangalore/Madras Communicational Teaching Project.

    ERIC Educational Resources Information Center

    Beretta, Alan; Davies, Alan

    The Bangalore Communicational Teaching Project (CTP) in India operates on the central tenet that in English instruction, form can be acquired through a focus on meaning alone, that a grammatical system can be assimilated unconsciously if the mind is engaged in trying to understand or convey meaning. Linguistic specification is not used in CTP, and…

  8. [The venture financing of scientifically-innovative projects: teaching experience in medical high school].

    PubMed

    Grachev, S V; Gorodnova, E A

    2008-01-01

    The authors presented an original material, devoted to first experience of teaching of theoretical bases of venture financing of scientifically-innovative projects in medical high school. The results and conclusions were based on data of the questionnaire performed by the authors. More than 90% of young scientist physicians recognized actuality of this problem for realization of their research work results into practice. Thus, experience of teaching of theoretical bases of venture financing of scientifically-innovative projects in medical high school proves reasonability of further development and inclusion the module "The venture financing of scientifically-innovative projects in biomedicine" in the training plan.

  9. Project Management in Higher Education

    ERIC Educational Resources Information Center

    Alpert, Shannon Atkinson

    2011-01-01

    This study identified factors that influenced the use of project management in higher education research projects. Using a qualitative grounded theory approach that included in-depth interviews with assistant professors, the researcher examined how these individuals were using project management processes and tools and factors that enabled,…

  10. Raising the Profile of Innovative Teaching in Higher Education? Reflections on the EquATE Project

    ERIC Educational Resources Information Center

    Robson, Sue; Wall, Kate; Lofthouse, Rachel

    2013-01-01

    This paper presents a methodology developed by members of the Research Centre for Learning and Teaching (RCfLAT) to collaborate with university teaching colleagues to produce theoretically- and pedagogically-based case studies of innovations in teaching and learning. The Equal Acclaim for Teaching Excellence (EquATE) project investigates…

  11. On Services for Collaborative Project Management

    NASA Astrophysics Data System (ADS)

    Ollus, Martin; Jansson, Kim; Karvonen, Iris; Uoti, Mikko; Riikonen, Heli

    This paper presents an approach for collaborative project management. The focus is on the support of collaboration, communication and trust. Several project management tools exist for monitoring and control the performance of project tasks. However, support of important intangible assets is more difficult to find. In the paper a leadership approach is identified as a management means and the use of new IT technology, especially social media for support of leadership in project management is discussed.

  12. Managing Stress. Project Seed.

    ERIC Educational Resources Information Center

    Muto, Donna; Wilk, Jan

    One of eight papers from Project Seed, this paper describes a stress management project undertaken with high school sophomores. Managing Stress is described as an interactive workshop that offers young people an opportunity to examine specific areas of stress in their lives and to learn effective ways to deal with them. The program described…

  13. 78 FR 16460 - Capital Project Management

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-15

    ...-0030] RIN 2132-AA92 Capital Project Management AGENCY: Federal Transit Administration (FTA), DOT... withdrawing its September 13, 2011, Notice of Proposed Rulemaking to revise the agency's project management... will reinitiate a rulemaking for project management oversight in the near future. Additionally, FTA may...

  14. 76 FR 56363 - Capital Project Management

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-13

    ...-0030] RIN 2132-AA92 Capital Project Management AGENCY: Federal Transit Administration (FTA), DOT... current FTA rule for project management oversight into a discrete set of managerial principles for sponsors of major capital projects; enable FTA to more clearly identify the necessary management capacity...

  15. Management evolution in the LSST project

    NASA Astrophysics Data System (ADS)

    Sweeney, Donald; Claver, Charles; Jacoby, Suzanne; Kantor, Jeffrey; Krabbendam, Victor; Kurita, Nadine

    2010-07-01

    The Large Synoptic Survey Telescope (LSST) project has evolved from just a few staff members in 2003 to about 100 in 2010; the affiliation of four founding institutions has grown to 32 universities, government laboratories, and industry. The public private collaboration aims to complete the estimated $450 M observatory in the 2017 timeframe. During the design phase of the project from 2003 to the present the management structure has been remarkably stable. At the same time, the funding levels, staffing levels and scientific community participation have grown dramatically. The LSSTC has introduced project controls and tools required to manage the LSST's complex funding model, technical structure and distributed work force. Project controls have been configured to comply with the requirements of federal funding agencies. Some of these tools for risk management, configuration control and resource-loaded schedule have been effective and others have not. Technical tasks associated with building the LSST are distributed into three subsystems: Telescope & Site, Camera, and Data Management. Each sub-system has its own experienced Project Manager and System Scientist. Delegation of authority is enabling and effective; it encourages a strong sense of ownership within the project. At the project level, subsystem management follows the principle that there is one Board of Directors, Director, and Project Manager who have overall authority.

  16. [The research project: financing and management].

    PubMed

    Schena, F P

    2003-01-01

    Basic and clinical research is accomplished by projects. The design of a project is not only based on the scientific content but also on its financing and management. This article wants to illustrate the correct modalities for project financing and project management in a scientific project.

  17. Astronomical large projects managed with MANATEE: management tool for effective engineering

    NASA Astrophysics Data System (ADS)

    García-Vargas, M. L.; Mujica-Alvarez, E.; Pérez-Calpena, A.

    2012-09-01

    This paper describes MANATEE, which is the Management project web tool developed by FRACTAL, specifically designed for managing large astronomical projects. MANATEE facilitates the management by providing an overall view of the project and the capabilities to control the three main projects parameters: scope, schedule and budget. MANATEE is one of the three tools of the FRACTAL System & Project Suite, which is composed also by GECO (System Engineering Tool) and DOCMA (Documentation Management Tool). These tools are especially suited for those Consortia and teams collaborating in a multi-discipline, complex project in a geographically distributed environment. Our Management view has been applied successfully in several projects and currently is being used for Managing MEGARA, the next instrument for the GTC 10m telescope.

  18. 76 FR 67400 - Capital Project Management

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-01

    ...-0030] RIN 2132-AA92 Capital Project Management AGENCY: Federal Transit Administration (FTA), DOT... extending the comment period on its proposed rule for Capital Project Management to December 2, 2011, to...) proposing to transform the current FTA rule for project management oversight into a discrete set of...

  19. Teaching Improvement Model Designed with DEA Method and Management Matrix

    ERIC Educational Resources Information Center

    Montoneri, Bernard

    2014-01-01

    This study uses student evaluation of teachers to design a teaching improvement matrix based on teaching efficiency and performance by combining management matrix and data envelopment analysis. This matrix is designed to formulate suggestions to improve teaching. The research sample consists of 42 classes of freshmen following a course of English…

  20. I-15 integrated corridor management system : project management plan.

    DOT National Transportation Integrated Search

    2011-06-01

    The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and deployment of the ICM System. The PMP...

  1. Performance of Clinical Nurse Educators in Teaching Pharmacology and Medication Management: Nursing Students’ Perceptions

    PubMed Central

    Ghamari Zare, Zohre; Adib-Hajbaghery, Mohsen

    2016-01-01

    Background Pharmacological knowledge and medication management skills of student nurses greatly depend on the clinical nurse educators’ performance in this critical issue. However, the Iranian nurse educators’ performance in teaching pharmacology and medication management are not adequately studied. Objectives The current study aimed to investigate the nursing students’ perceptions on the status of clinical pharmaceutical and medication management education. Materials and Methods A cross-sectional study was conducted on all 152 nursing students registered in the seventh and eighth semesters at the Qom and Naragh branches of Islamic Azad University, and Kashan University of Medical Sciences in 2013 - 2014 academic year. The students’ perceptions on the performance of clinical nurse educators in teaching pharmacology and medication management were assessed using a researcher made questionnaire. The questionnaire consisted of 31 items regarding clinical educators’ performance in teaching pharmacology and medication management and two questions about students’ satisfaction with their level of knowledge and skills in pharmacology and medication management. Descriptive statistics was employed and analysis of variance was performed to compare the mean of scores of teaching pharmacology and medication management in the three universities. Results Among a total of 152 subjects, 82.9% were female and their mean age was 22.57 ± 1.55 years. According to the students, instructors had the weakest performance in the three items of teaching pharmacology and medication management based on the students’ learning needs, teaching medication management through a patient-centered method and teaching pharmacology and medication management based on the course plan. The students’ satisfaction regarding their own knowledge and skill of pharmacology and medication management was at medium level. Conclusions Nursing students gave a relatively low score in several aspects of

  2. Advanced project management : training manual.

    DOT National Transportation Integrated Search

    2006-07-14

    This course identifies the principles and methodologies adopted by the Indiana Department of Transportation (INDOT) to support successful project management and delivery. Project management requires the application of knowledge, skills, tools, and te...

  3. Teaching Ecology to Undergraduates: A Practical Course Using Projects.

    ERIC Educational Resources Information Center

    Dangerfield, J. M.; And Others

    1987-01-01

    Describes how short-term laboratory projects were used to teach population and community ecology to undergraduate environmental science students. Directed students to formulate and implement their own hypotheses and experimental designs. Uses questionnaire results and written reports to assess the contribution of the course to student…

  4. Managing a project's legacy: implications for organizations and project management

    NASA Technical Reports Server (NTRS)

    Cooper, Lynne P.; Hecht, Michael H.; Majchrzak, Ann

    2003-01-01

    Organizations that rely on projects to implement their products must find effective mechanisms for propagating lessons learned on one project throughout the organization. A broad view of what constitutes a project's 'legacy' is presented that includes not just the design products and leftover parts, but new processes, relationships, technology, skills, planning data, and performance metrics. Based on research evaluating knowledge reuse in innovative contexts, this paper presents an approach to project legacy management that focuses on collecting and using legacy knowledge to promote organizational learning and effective reuse, while addressing factors of post-project responsibility, information obsolescence, and the importance of ancillary contextual information. .

  5. Le Nouveau Manuel de Formation sur l'Elaboration et la Gestion des Projets. (The New Project Design and Management Workshop Training Manual).

    ERIC Educational Resources Information Center

    Peace Corps, Washington, DC. Information Collection and Exchange Div.

    A french language version of a training manual that presents guidelines for planning and conducting a project design and management (PDM) workshop to teach Peace Corps volunteers to involve local community members in the process of using participatory analysis tools and planning and implementing projects meeting local desires and needs. The first…

  6. Urban Teachers' Professed Classroom Management Strategies: Reflections of Culturally Responsive Teaching

    ERIC Educational Resources Information Center

    Brown, Dave F.

    2004-01-01

    Thirteen urban educators teaching from 1st through 12th grade selected from 7 cities across the United States were interviewed in this qualitative research study to determine if the classroom management strategies they use reflect the research on culturally responsive teaching. Participants revealed using several management strategies that reflect…

  7. Application of Project Portfolio Management

    NASA Astrophysics Data System (ADS)

    Pankowska, Malgorzata

    The main goal of the chapter is the presentation of the application project portfolio management approach to support development of e-Municipality and public administration information systems. The models of how people publish and utilize information on the web have been transformed continually. Instead of simply viewing on static web pages, users publish their own content through blogs and photo- and video-sharing slides. Analysed in this chapter, ICT (Information Communication Technology) projects for municipalities cover the mixture of the static web pages, e-Government information systems, and Wikis. So, for the management of the ICT projects' mixtures the portfolio project management approach is proposed.

  8. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  9. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  10. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  11. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  12. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  13. The Open Source Teaching Project (OSTP): Research Note.

    ERIC Educational Resources Information Center

    Hirst, Tony

    The Open Source Teaching Project (OSTP) is an attempt to apply a variant of the successful open source software approach to the development of educational materials. Open source software is software licensed in such a way as to allow anyone the right to modify and use it. From such a simple premise, a whole industry has arisen, most notably in the…

  14. Validation Engine for Observational Protocols. Measures of Effective Teaching (MET) Project

    ERIC Educational Resources Information Center

    Bill & Melinda Gates Foundation, 2010

    2010-01-01

    In the fall of 2009, the Bill and Melinda Gates Foundation launched the two-year Measures of Effective Teaching (MET) project to rigorously develop and test multiple measures of teacher effectiveness. As part of the project, partners from more than a dozen reputable academic, non-profit and for-profit organizations collected and analyzed data from…

  15. A Qualitative Study on Certified Female Project Managers and Perceived Value of the Project Management Professional Certification

    ERIC Educational Resources Information Center

    Bozylinski, Elena

    2017-01-01

    The purpose of this phenomenological qualitative study was to explore the influence of the Project Management Professional (PMP) certification on the careers of PMP-certified female information technology project managers who are current members in a mid-Atlantic Project Management Institute chapter in the United States. The aim of this study was…

  16. The teaching researcher: faculty attitudes towards the teaching and research roles

    NASA Astrophysics Data System (ADS)

    Alpay, E.; Verschoor, R.

    2014-07-01

    Results from a survey on faculty attitudes towards the teaching and research roles are presented. Attention is given to: (i) the perceived value of teaching (and teaching achievements) relative to research, (ii) approaches for research and teaching integration, (iii) the satisfaction gained from typical work tasks, and (iv) the importance of various work-life factors. Factors such as academic freedom, an intellectual work environment, flexible work hours, inspirational colleagues, and work diversity are found to be highly valued. Support from peers and colleagues is also seen as a key in learning to manage the different academic roles. A relatively low value is attributed to teaching achievements. Likewise, there is often little utilisation of teaching opportunities to support research work (other than senior-year research projects). Female faculty were found to give marginally a higher importance to teaching recognition and collaborative teaching opportunities. Based on the findings, general recommendations for supporting the teaching researcher are presented.

  17. Financial Management: Development and Management of the Army Game Project

    DTIC Science & Technology

    2005-08-24

    Financial Management Department of Defense Office of Inspector General August 24, 2005 Development and Management of the Army Game Project (D-2005...Management of the Army Game Project 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK...Suggestions) Department of Defense Inspector General 400 Army Navy Drive (Room 801) Arlington, VA 22202-4704 Acronyms AGP Army Game Project FMR

  18. Project Management Life Cycle Models to Improve Management in High-rise Construction

    NASA Astrophysics Data System (ADS)

    Burmistrov, Andrey; Siniavina, Maria; Iliashenko, Oksana

    2018-03-01

    The paper describes a possibility to improve project management in high-rise buildings construction through the use of various Project Management Life Cycle Models (PMLC models) based on traditional and agile project management approaches. Moreover, the paper describes, how the split the whole large-scale project to the "project chain" will create the factor for better manageability of the large-scale buildings project and increase the efficiency of the activities of all participants in such projects.

  19. EPSE Project 2: Designing and Evaluating Short Teaching Sequences, Informed by Research Evidence.

    ERIC Educational Resources Information Center

    Leach, John; Hind, Andy; Lewis, Jenny; Scott, Phil

    2002-01-01

    Reports on Project 2 from the Evidence-based Practice in Science Education (EPSE) Research Network. In this project, teachers and researchers worked collaboratively on the design of three short teaching sequences on electric circuits. (DDR)

  20. Is your organization project management savvy?

    PubMed

    Wolff, Pam

    2003-01-01

    As corporations struggle to gain better control and use of organizational resources in a rapidly changing business environment, they're finding that project management is an efficacious discipline for supporting strategic initiatives and achieving business goals. Successful project management requires an understanding of the business drivers, the organizational structure, the benefits of centralizing project management, and the factors that could impact performance.

  1. Computer Aided Management for Information Processing Projects.

    ERIC Educational Resources Information Center

    Akman, Ibrahim; Kocamustafaogullari, Kemal

    1995-01-01

    Outlines the nature of information processing projects and discusses some project management programming packages. Describes an in-house interface program developed to utilize a selected project management package (TIMELINE) by using Oracle Data Base Management System tools and Pascal programming language for the management of information system…

  2. Management Of Optical Projects

    NASA Astrophysics Data System (ADS)

    Young, Peter S.; Olson, David R.

    1981-03-01

    This paper discusses the management of optical projects from the concept stage, beginning with system specifications, through design, optical fabrication and test tasks. Special emphasis is placed on effective coupling of design engineering with fabrication development and utilization of available technology. Contrasts are drawn between accepted formalized management techniques, the realities of dealing with fragile components and the necessity of an effective project team which integrates the special characteristics of highly skilled optical specialists including lens designers, optical engineers, opticians, and metrologists. Examples are drawn from the HEAO-2 X-Ray Telescope and Space Telescope projects.

  3. Integrated Risk Management Within NASA Programs/Projects

    NASA Technical Reports Server (NTRS)

    Connley, Warren; Rad, Adrian; Botzum, Stephen

    2004-01-01

    As NASA Project Risk Management activities continue to evolve, the need to successfully integrate risk management processes across the life cycle, between functional disciplines, stakeholders, various management policies, and within cost, schedule and performance requirements/constraints become more evident and important. Today's programs and projects are complex undertakings that include a myriad of processes, tools, techniques, management arrangements and other variables all of which must function together in order to achieve mission success. The perception and impact of risk may vary significantly among stakeholders and may influence decisions that may have unintended consequences on the project during a future phase of the life cycle. In these cases, risks may be unintentionally and/or arbitrarily transferred to others without the benefit of a comprehensive systemic risk assessment. Integrating risk across people, processes, and project requirements/constraints serves to enhance decisions, strengthen communication pathways, and reinforce the ability of the project team to identify and manage risks across the broad spectrum of project management responsibilities. The ability to identify risks in all areas of project management increases the likelihood a project will identify significant issues before they become problems and allows projects to make effective and efficient use of shrinking resources. By getting a total team integrated risk effort, applying a disciplined and rigorous process, along with understanding project requirements/constraints provides the opportunity for more effective risk management. Applying an integrated approach to risk management makes it possible to do a better job at balancing safety, cost, schedule, operational performance and other elements of risk. This paper will examine how people, processes, and project requirements/constraints can be integrated across the project lifecycle for better risk management and ultimately improve the

  4. Ranking the Project Management Success Factors for Construction Project in South India

    NASA Astrophysics Data System (ADS)

    Aneesha, K.; Haridharan, M. K.

    2017-07-01

    In Today’s construction industry, to achieve a greater advantage over the firms, success of each project and efficiency is required. Effective Project Management overcomes these types of challenges. This study identifies the success factors which are important for project management in construction project success. From the literature review, 26 factors were found to be critical. Project managers, construction managers, civil engineers, contractors and site engineers were the respondents. After analyzing the data in SPSS software, the dominant factors from the regression analysis are top management support, competent project team, abilities to solve problems, realistic cost and time estimates, information/communication, competency of the project manager are the 6 factors out of 12 in 26 factors. Effective communication between stakeholders got highest priority and client involvement, good leadership, clarity of project goals got second priority. Informal communication gives better results compared to formal communications like written formats. To remove communication barrier with the stakeholders, informal communication like speaking face-to-face with the language this fits for the stakeholders.

  5. Group dynamics for the acquisition of competences in Project Management

    NASA Astrophysics Data System (ADS)

    Taguas, E. V.; Aguilar, M. C.; Castillo, C.; Polo, M. J.; Pérez, R.

    2012-04-01

    The Bologna Process promotes European citizens' employability from teaching fields in the University which implies the design of activities addressed to the development of skills for the labor market and engagement of employers. This work has been conceived for improving the formation of Engineering Project Management through group dynamics focused on: 1) the use of the creativity for solving problems; 2) promoting leadership capacities and social skills in multidisciplinary/multicultural work groups; 3) the ethical, social and environmental compromise; 4) the continuous learning. Different types of activities were designed: short activities of 15-30 minutes where fragments of books or songs are presented and discussed and long activities (2 h) where groups of students take different roles for solving common problems and situations within the Engineering Projects context. An electronic book with the content of the dynamics and the material for the students has been carried out. A sample of 20 students of Electronic Engineering degree which had participated at least in two dynamics, evaluated the utility for improving their formation in Engineering Project Management with a mark of 8.2 (scale 0-10, standard deviation equal to 0.9). On the other hand, the teachers observed how this type of work, promotes the interdisciplinary training and the acquisition of social skills, usually not-included in the objectives of the subjects.

  6. Approaches to Teaching Energy. Energy and Ourselves/Energy for the Consumer. Children's Learning in Science Project.

    ERIC Educational Resources Information Center

    Leeds Univ. (England). Centre for Studies in Science and Mathematics Education.

    During the period 1984-1986, over 30 teachers from the Yorkshire (England) region have worked in collaboration with the Children's Learning in Science Project (CLIS) developing and testing teaching schemes in the areas of energy, particle theory, and plant nutrition. The project is based upon the constructivist approach to teaching. This guide…

  7. Operations Management Teaching: Establishing Content and Relevance to Practitioners

    ERIC Educational Resources Information Center

    Doran, Desmond; Hill, Alex; Brown, Steve; Aktas, Emel; Kuula, Markku

    2013-01-01

    This paper explores the relevance to industry's needs of operations management (OM) teaching in higher education, by researching the content of OM modules delivered by UK academics and comparing the results of this research with the views of business practitioners having had first-hand experience of OM teaching on MBA programmes. To determine…

  8. Enhancing the Teaching-Learning Process: A Knowledge Management Approach

    ERIC Educational Resources Information Center

    Bhusry, Mamta; Ranjan, Jayanthi

    2012-01-01

    Purpose: The purpose of this paper is to emphasize the need for knowledge management (KM) in the teaching-learning process in technical educational institutions (TEIs) in India, and to assert the impact of information technology (IT) based KM intervention in the teaching-learning process. Design/methodology/approach: The approach of the paper is…

  9. An Approach for Implementation of Project Management Information Systems

    NASA Astrophysics Data System (ADS)

    Běrziša, Solvita; Grabis, Jānis

    Project management is governed by project management methodologies, standards, and other regulatory requirements. This chapter proposes an approach for implementing and configuring project management information systems according to requirements defined by these methodologies. The approach uses a project management specification framework to describe project management methodologies in a standardized manner. This specification is used to automatically configure the project management information system by applying appropriate transformation mechanisms. Development of the standardized framework is based on analysis of typical project management concepts and process and existing XML-based representations of project management. A demonstration example of project management information system's configuration is provided.

  10. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor)

    1994-01-01

    This volume is the eighth in an ongoing series addressing current topics and lessons learned in NASA program and project management. Articles in this volume cover the following topics: (1) power sources for the Galileo and Ulysses Missions; (2) managing requirements; (3) program control of the Tropical Rainfall Measuring Mission; (4) project management method; (5) career development for project managers; and (6) resources for NASA managers.

  11. Application of IT-technologies in visualization of innovation project life-cycle stages during the study of the course "Management of innovation projects"

    NASA Astrophysics Data System (ADS)

    Kolychev, V. D.; Prokhorov, I. V.

    2017-01-01

    The article presents a methodology for the application of IT-technologies in teaching discipline "Management of innovation projects," which helps students to be more competitive and gather the useful skills for their future specialization in high-tech areas. IT-technologies are widely used nowadays in educational and training spheres especially in knowledge-intensive disciplines such as systems analysis, the theory of games, operations research, theory of risks, innovation management etc. For studying such courses it is necessary to combine both mathematical models and information technology approaches for the clear understanding of the investigated object. That is why this article comprises both the framework of research and the IT-tools for investigation in the educational process. Taking into consideration the importance of the IT-system implementation especially for the university we assume to suggest the methods of research in the area of innovation projects with the help of IT-support.

  12. Effective Strategies for Teaching Evolution: The Primary Evolution Project

    ERIC Educational Resources Information Center

    Hatcher, Chris

    2015-01-01

    When Chris Hatcher joined the Primary Evolution Project team at the University of Reading, his goal was to find effective strategies to teach evolution in a way that keeps children engaged and enthused. Hatcher has collaborated with colleagues at the University's Institute of Education to break the evolution unit down into distinct topics and…

  13. Product Quality Assurance Project for Teaching of Food Analysis

    ERIC Educational Resources Information Center

    Nielsen, S. S.

    2004-01-01

    Two of the challenges in teaching Food Analysis are bringing relevance to the various chemical and physical analyses discussed and exposing students to the realities of quality assurance in the food industry. In a project to help meet those objectives, each student, with the assistance of a "resource person" from the food industry, completes the…

  14. Toward an expert project management system

    NASA Technical Reports Server (NTRS)

    Silverman, Barry G.; Murray, Arthur; Diakite, Coty; Feggos, Kostas

    1987-01-01

    The purpose of the research effort is to prescribe a generic reusable shell that any project office can install and customize for the purposes of advising, guiding, and supporting project managers in that office. The prescribed shell is intended to provide both: a component that generates prescriptive guidance for project planning and monitoring activities, and an analogy (intuition) component that generates descriptive insights of previous experience of successful project managers. The latter component is especially significant in that it has the potential to: retrieve insights, not just data, and provide a vehicle for expert PMs to easily transcribe their current experiences in the course of each new project managed.

  15. Project Management in Real Time: A Service-Learning Project

    ERIC Educational Resources Information Center

    Larson, Erik; Drexler, John A., Jr.

    2010-01-01

    This article describes a service-learning assignment for a project management course. It is designed to facilitate hands-on student learning of both the technical and the interpersonal aspects of project management, and it involves student engagement with real customers and real stakeholders in the creation of real events with real outcomes. As…

  16. Teaching Breast and Testicular Self-Exams: Evaluation of a High School Curriculum Pilot Project.

    ERIC Educational Resources Information Center

    Luther, Stephen L.; And Others

    1985-01-01

    A high school curriculum project was developed to teach students about the importance of breast and testicular self-examination. Questionnaires were used to evaluate the project. Results are discussed. (DF)

  17. Course Formats for Teaching Management Consulting

    ERIC Educational Resources Information Center

    Schmidt, Sascha L.; Richter, Ansgar

    2006-01-01

    In this article, the authors introduce 3 different course formats for teaching management consulting at the university. On the basis of data from self-evaluation questionnaires from 159 students, the authors analyze effectiveness of these course designs in raising the self-confidence of participants to cope with the kind of tasks typically faced…

  18. Responding to Contestation in Teaching and Learning Projects in the Centres for Excellence in Teaching and Learning in the United Kingdom

    ERIC Educational Resources Information Center

    Gosling, David; Turner, Rebecca

    2015-01-01

    Government-funded teaching and learning projects have emerged as a favoured tool of policymakers to motivate change in teaching and learning. This strategy pays limited heed to the complexity of higher education and the contradictions, tensions and conflicts that need to be negotiated to change practice. This process of negotiation creates sites…

  19. Teaching trainers to incorporate evidence-based medicine (EBM) teaching in clinical practice: the EU-EBM project.

    PubMed

    Thangaratinam, Shakila; Barnfield, Gemma; Weinbrenner, Susanne; Meyerrose, Berit; Arvanitis, Theodoros N; Horvath, Andrea R; Zanrei, Gianni; Kunz, Regina; Suter, Katja; Walczak, Jacek; Kaleta, Anna; Oude Rengerink, Katrien; Gee, Harry; Mol, Ben W J; Khan, Khalid S

    2009-09-10

    applicability to clinical practice. Once fully implemented, the ultimate outcome of this pilot project will be a European qualification in teaching EBM, which will be used by doctors, hospitals, professional bodies responsible for postgraduate qualifications and continuing medical education.

  20. Teaching trainers to incorporate evidence-based medicine (EBM) teaching in clinical practice: the EU-EBM project

    PubMed Central

    Thangaratinam, Shakila; Barnfield, Gemma; Weinbrenner, Susanne; Meyerrose, Berit; Arvanitis, Theodoros N; Horvath, Andrea R; Zanrei, Gianni; Kunz, Regina; Suter, Katja; Walczak, Jacek; Kaleta, Anna; Rengerink, Katrien Oude; Gee, Harry; Mol, Ben WJ; Khan, Khalid S

    2009-01-01

    steps of EBM and demonstrate their applicability to clinical practice. Once fully implemented, the ultimate outcome of this pilot project will be a European qualification in teaching EBM, which will be used by doctors, hospitals, professional bodies responsible for postgraduate qualifications and continuing medical education. PMID:19744327

  1. Short Duration Emergency Incidents Managed as Projects

    NASA Astrophysics Data System (ADS)

    Nixon, Thomas J.

    Emergency incidents have historically been managed by experience and some directional principles usually found in SOPs/SOGs or other pre-incident planning documents. The use of experience has the risk of bias influencing the decisions being made in truly life or death situations. Responders of disasters, long duration emergency incidents, are often equipped with a framework adapted to the project management lifecycle to assure the project priorities are adequately addressed. The disaster framework provides for savings from risk, loss, waste. This research is demonstrating the ability and reasoning to develop a framework to address short duration emergency incidents and expand the events that can be managed as a project. The research of the literature found that a framework can be applied to the project management lifecycle and the priorities of a short duration emergency incident can be managed as a project. The limitations of not having the ability to conduct empirical testing and the risks of not developing a formal implementation plan are discussed. Short duration emergency incidents are found to be capable of being managed as projects and will benefit from the effectiveness of project management methodologies.

  2. Harnessing the Power of Technologies to Manage Collaborative e-Learning Projects in Dispersed Environments

    ERIC Educational Resources Information Center

    Gosper, Maree Veroncia; McNeill, Margot Anne; Woo, Karen

    2010-01-01

    "The impact of web-based lecture technologies on current and future practice in learning and teaching" was a collaborative project across four Australian universities, funded by the Australian Learning and Teaching Council (ALTC). The project was both exploratory and developmental in nature and according to the project's external…

  3. Traditional lecture versus jigsaw learning method for teaching Medication Therapy Management (MTM) core elements.

    PubMed

    Wilson, Jennifer A; Pegram, Angela H; Battise, Dawn M; Robinson, April M

    2017-11-01

    To determine if traditional didactic lecture or the jigsaw learning method is more effective to teach the medication therapy management (MTM) core elements in a first year pharmacy course. Traditional didactic lecture and a pre-class reading assignment were used in the fall semester cohort, and the jigsaw method was used in the spring semester cohort. Jigsaw is a cooperative learning strategy requiring students to assume responsibility for learning, and subsequently teaching peers. The students were responsible for reading specific sections of the pre-class reading, and then teaching other students in small groups about their specific reading assignments. To assess potential differences, identical pre- and post-tests were administered before and after the MTM section. Additionally, grade performance on an in-class project and final exam questions were compared, and students were surveyed on perceptions of teaching method used. A total of 45 and 43 students completed both the pre- and post-test in the fall and spring (96% and 93% response rate), respectively. Improvement in post-test scores favored the traditional method (p = 0.001). No statistical differences were noted between groups with grade performance on the in-class project and final exam questions. However, students favored the jigsaw method over traditional lecture and perceived improvements in problem solving skills, listening/communication skills and encouragement of cooperative learning (p = 0.018, 0.025 and 0.031). Although students favored the jigsaw learning method, traditional didactic lecture was more effective for the pre- and post-knowledge test performance. This may indicate that traditional didactic lecture is more effective for more foundational content. Copyright © 2017 Elsevier Inc. All rights reserved.

  4. Construction project management handbook.

    DOT National Transportation Integrated Search

    2012-03-01

    The purpose of the FTA Construction Project Management Handbook is to provide guidelines for use by public transit agencies (Agen-cies) undertaking substantial construction projects, either for the first time or with little prior experience with cons...

  5. Researchers' experience with project management in health and medical research: Results from a post-project review

    PubMed Central

    2011-01-01

    Background Project management is widely used to deliver projects on time, within budget and of defined quality. However, there is little published information describing its use in managing health and medical research projects. We used project management in the Alcohol and Pregnancy Project (2006-2008) http://www.ichr.uwa.edu.au/alcoholandpregnancy and in this paper report researchers' opinions on project management and whether it made a difference to the project. Methods A national interdisciplinary group of 20 researchers, one of whom was the project manager, formed the Steering Committee for the project. We used project management to ensure project outputs and outcomes were achieved and all aspects of the project were planned, implemented, monitored and controlled. Sixteen of the researchers were asked to complete a self administered questionnaire for a post-project review. Results The project was delivered according to the project protocol within the allocated budget and time frame. Fifteen researchers (93.8%) completed a questionnaire. They reported that project management increased the effectiveness of the project, communication, teamwork, and application of the interdisciplinary group of researchers' expertise. They would recommend this type of project management for future projects. Conclusions Our post-project review showed that researchers comprehensively endorsed project management in the Alcohol and Pregnancy Project and agreed that project management had contributed substantially to the research. In future, we will project manage new projects and conduct post-project reviews. The results will be used to encourage continuous learning and continuous improvement of project management, and provide greater transparency and accountability of health and medical research. The use of project management can benefit both management and scientific outcomes of health and medical research projects. PMID:21635721

  6. 7 CFR 3560.102 - Housing project management.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Housing project management. 3560.102 Section 3560.102... § 3560.102 Housing project management. (a) General. Borrowers hold final responsibility for housing project management and must ensure that operations comply with the terms of all loan or grant documents...

  7. Improvement of hospital processes through business process management in Qaem Teaching Hospital: A work in progress.

    PubMed

    Yarmohammadian, Mohammad H; Ebrahimipour, Hossein; Doosty, Farzaneh

    2014-01-01

    In a world of continuously changing business environments, organizations have no option; however, to deal with such a big level of transformation in order to adjust the consequential demands. Therefore, many companies need to continually improve and review their processes to maintain their competitive advantages in an uncertain environment. Meeting these challenges requires implementing the most efficient possible business processes, geared to the needs of the industry and market segments that the organization serves globally. In the last 10 years, total quality management, business process reengineering, and business process management (BPM) have been some of the management tools applied by organizations to increase business competiveness. This paper is an original article that presents implementation of "BPM" approach in the healthcare domain that allows an organization to improve and review its critical business processes. This project was performed in "Qaem Teaching Hospital" in Mashhad city, Iran and consists of four distinct steps; (1) identify business processes, (2) document the process, (3) analyze and measure the process, and (4) improve the process. Implementing BPM in Qaem Teaching Hospital changed the nature of management by allowing the organization to avoid the complexity of disparate, soloed systems. BPM instead enabled the organization to focus on business processes at a higher level.

  8. Management of an eLearning Evaluation Project: The e3Learning Model

    ERIC Educational Resources Information Center

    Lam, Paul; McNaught, Carmel

    2007-01-01

    This article describes the evaluation of purpose-built course websites for university-level teaching and learning developed by a funded project (e3Learning, e3L) in Hong Kong, which was designed to support teachers in three universities to supplement classroom teaching with eLearning. Previous articles on the e3L project have described the…

  9. 43 CFR 418.29 - Project management.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Project management. 418.29 Section 418.29... INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Enforcement § 418.29 Project management. In addition to the provisions of § 418.28, if the District is found to be...

  10. 43 CFR 418.29 - Project management.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Project management. 418.29 Section 418.29... INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Enforcement § 418.29 Project management. In addition to the provisions of § 418.28, if the District is found to be...

  11. 43 CFR 418.29 - Project management.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Project management. 418.29 Section 418.29... INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Enforcement § 418.29 Project management. In addition to the provisions of § 418.28, if the District is found to be...

  12. 43 CFR 418.29 - Project management.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Project management. 418.29 Section 418.29... INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Enforcement § 418.29 Project management. In addition to the provisions of § 418.28, if the District is found to be...

  13. The Dynamics of Project-Based Learning Extension Courses: The "Laboratory of Social Projects" Case Study

    ERIC Educational Resources Information Center

    Arantes do Amaral, Joao Alberto

    2017-01-01

    In this case study we discuss the dynamics that drive a free-of-charge project-based learning extension course. We discuss the lessons learned in the course, "Laboratory of Social Projects." The course aimed to teach project management skills to the participants. It was conducted from August to November of 2015, at Federal University of…

  14. Effective Safety Management in Construction Project

    NASA Astrophysics Data System (ADS)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    Effective safety management is one of the serious problems in the construction industry worldwide, especially in large-scale construction projects. There have been significant reductions in the number and the rate of injury over the last 20 years. Nevertheless, construction remains as one of the high risk industry. The purpose of this study is to examine safety management in the Malaysian construction industry, as well as to highlight the importance of construction safety management. The industry has contributed significantly to the economic growth of the country. However, when construction safety management is not implemented systematically, accidents will happen and this can affect the economic growth of the country. This study put the safety management in construction project as one of the important elements to project performance and success. The study emphasize on awareness and the factors that lead to the safety cases in construction project.

  15. Principles of project management

    NASA Technical Reports Server (NTRS)

    1982-01-01

    The basic principles of project management as practiced by NASA management personnel are presented. These principles are given as ground rules and guidelines to be used in the performance of research, development, construction or operational assignments.

  16. A new window into nurse manager development: teaching for the practice.

    PubMed

    Cathcart, Eloise Balasco; Greenspan, Miriam

    2012-12-01

    An important domain that emerged from the interpretation of 91 nurse manager (NM) narratives was achieving the right relationship between a NM and a recalcitrant staff member. This article depicts the qualitative distinctions in 2 stages of NM practice to show the importance of reflection on experiential learning in the development of expertise. This work confirms that NM development is more complex than teaching a curriculum of business and management theory and should include teaching for mastery of the skilled know-how of clinical leadership practice and formation of the person as manager.

  17. Traditional Project Management and the Visual Workplace Environment to Improve Project Success

    ERIC Educational Resources Information Center

    Fichera, Christopher E.

    2016-01-01

    A majority of large IT projects fail to meet scheduled deadlines, are over budget and do not satisfy the end user. Many projects fail in spite of utilizing traditional project management techniques. Research of project management has not identified the use of a visual workspace as a feature affecting or influencing the success of a project during…

  18. Teaching methods in the healthcare management major.

    PubMed

    Petrova, Gergana G; Popov, Teodor N

    2009-01-01

    Organisation and management are factors of paramount importance in higher education for achieving higher quality of training, better professional adaptation, and more effective career pursuance of the students. The present study analyses the use of various teaching methods for the students in the major of Healthcare Management as they are employed in two medical universities. We conducted a detailed questionnaire survey which included the students in the Healthcare Management major in the Faculty of Public Health (FPH) at Sofia Medical University (SMU) and the Medical Faculty of Plovdiv Medical University (PMU). The students were surveyed for two consecutive academic years (2004/2005 and 2005/2006). The logical units of study were 198 students completing their baccalaureate programs in Healthcare Management: 145 (73.23+/-3.15%) in the FPH, SMU and 53 (26.77+/-3.15%) in the PMU (the greater number of students from the SMU was due to the greater number of students admitted into the Sofia Medical University). The technical units of study were the Faculty of Public Health in the Medical University in Sofia and the Medical faculty in the Medical University in Plovdiv. The survey was carried out using our own questionnaire form comprising 51 questions (open and closed), some of them allowing more than one answer. The collected sociological data were analysed using SPSS v. 13.0, and the diagrams were made using Microsoft Excel' 97. We used the alternative, non-parametric and graphic analyses to illustrate the processes and events at a level of significance P < 0.05. The most frequently used teaching method in both Medical Universities is the lecture (30.43+/-3.63% for PMU and 26.32+/-1.91% for SMU). This format of teaching is also considered to be the easiest with regard to learning the study material by 22.75+/-3.25% of the PMU graduates and 27.56+/-2.38% of the SMU graduates. The PMU students regard seminars, individual work and discussions as the format that afford the

  19. The seven habits of highly effective project managers

    NASA Astrophysics Data System (ADS)

    Warner, Mark; Summers, Richard

    2016-08-01

    Why do some astronomy projects succeed, while others fail? There are obviously many different factors that can and do influence the outcome of any given project, but one of the most prevalent characteristics among successful projects is the combined skills and qualifications of the project manager (PM) at their helms. But this begs an obvious question: what exactly makes a project manager "skilled and qualified?" Asked another way, are there common traits, philosophies, and/or techniques that the most successful PMs share, and if so, what are they? The short answer is yes, the majority successful engineering project managers have significant skills, habits, and character traits in common. The longer answer is there are at least seven of these key traits, or "habits" that many successful PMs share and, more importantly, implement within their respective projects. This paper presents these key factors, including thoughts on scope and quality management, cost and schedule control, project team structures, risk management strategies, stakeholder management, and general project execution.

  20. 6 Project-Management Tips

    ERIC Educational Resources Information Center

    Demski, Jennifer

    2012-01-01

    When it comes to project management, the IT department is typically its own worst enemy. When project requests are pushed through the budgeting process by different departments, it's up to IT to make them all work. The staff is required to be "heroic" to get the project load done. People get to work over weekends and postpone their vacations. The…

  1. A New Tool for Effective and Efficient Project Management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Willett, Jesse A

    2011-12-01

    Organizations routinely handle thousands of projects per year, and it is difficult to manage all these projects concurrently. Too often, projects do not get the attention they need when they need it. Management inattention can lead to late projects or projects with less than desirable content and/or deliverables. This paper discusses the application of Visual Project Management (VPM) as a method to track and manage projects. The VPM approach proved to be a powerful management tool without the overhead and restrictions of traditional management methods.

  2. Teaching and learning the physician manager role: psychiatry residents' perspectives.

    PubMed

    Stergiopoulos, Vicky; Maggi, Julie; Sockalingam, Sanjeev

    2010-01-01

    Despite widespread consensus that additional training in administration is needed to prepare physicians for practice, little is known about how best to teach managerial competencies and how to integrate teaching into existing postgraduate curricula. This study aimed to elicit resident perspectives on administrative curriculum development following exposure to a pilot physician manager curriculum at the University of Toronto. The authors held five focus groups of psychiatry residents at the University of Toronto during 2008, engaging 40 trainees. Resident perspectives on barriers to teaching and learning administrative skills, preferred curriculum content and format and suggestions for integration of administrative training into the residency programme were elicited. Identified barriers to learning include lack of physician manager role clarity, dearth of learning opportunities and multiple competing demands on residents' time. Residents value a formal administrative curriculum and propose additional opportunities for experiential learning such as elective rotations and mentorship opportunities. Suggested strategies for integrating administrative teaching into residency include faculty development, rotation-specific administrative objectives and end of rotation resident evaluations. Our findings provide valuable learner input into an emerging educational framework aiming to address barriers to teaching administrative skills during residency and facilitate longitudinal reinforcement of learning.

  3. Examination of the relationship between project management critical success factors and project success of oil and gas drilling projects

    NASA Astrophysics Data System (ADS)

    Alagba, Tonye J.

    Oil and gas drilling projects are the primary means by which oil companies recover large volumes of commercially available hydrocarbons from deep reservoirs. These types of projects are complex in nature, involving management of multiple stakeholder interfaces, multidisciplinary personnel, complex contractor relationships, and turbulent environmental and market conditions, necessitating the application of proven project management best practices and critical success factors (CSFs) to achieve success. Although there is some practitioner oriented literature on project management CSFs for drilling projects, none of these is based on empirical evidence, from research. In addition, the literature has reported alarming rates of oil and gas drilling project failure, which is attributable not to technical factors, but to failure of project management. The aim of this quantitative correlational study therefore, was to discover an empirically verified list of project management CSFs, which consistent application leads to successful implementation of oil and gas drilling projects. The study collected survey data online, from a random sample of 127 oil and gas drilling personnel who were members of LinkedIn's online community "Drilling Supervisors, Managers, and Engineers". The results of the study indicated that 10 project management factors are individually related to project success of oil and gas drilling projects. These 10 CSFs are namely; Project mission, Top management support, Project schedule/plan, Client consultation, Personnel, Technical tasks, Client acceptance, Monitoring and feedback, Communication, and Troubleshooting. In addition, the study found that the relationships between the 10 CSFs and drilling project success is unaffected by participant and project demographics---role of project personnel, and project location. The significance of these findings are both practical, and theoretical. Practically, application of an empirically verified CSFs list to oil

  4. Successful healthcare programs and projects: organization portfolio management essentials.

    PubMed

    Pickens, Scott; Solak, Jamie

    2005-01-01

    Many healthcare organization projects take more time and resources than planned and fail to deliver desired business outcomes. Healthcare IT is a major component of many projects and often undeservedly receives the blame for failure. Poor results are often not a result of faulty healthcare IT or poor project management or poor project execution alone. Many projects fail because of poor portfolio management--poor planning and management of the portfolio of initiatives designed to meet an organization's strategic goals. Because resources are limited, portfolio management enables organizations to more strategically allocate and manage their resources so care delivery, service delivery, and initiatives that advance organizations toward their strategic goals, including healthcare IT initiatives, can be accomplished at the levels of quality and service desired by an organization. Proper portfolio management is the essential foundation for program and project success and supports overall organization success. Without portfolio management, even programs and projects that execute flawlessly may not meet desired objectives. This article discusses the essential requirements for porfolio management. These include opportunity identification, return on investment (ROI) forecast, project prioritization, capacity planning (inclusive of human, financial, capital, and facilities resources), work scheduling, program and project management and execution, and project performance and value assessment. Portfolio management is essential to successful healthcare project execution. Theories are drawn from the Organizational Project Management Maturity Model (OPM3) work of the Project Management Institute and other leading strategy, planning, and organization change management research institutes.

  5. Co-operative working in aged care: The Cooperative for Healthy Ageing Research and Teaching Project.

    PubMed

    Jamieson, Maggie; Grealish, Laurie

    2016-09-01

    The objective of this study was to describe the partnership mechanisms that supported teaching and research in aged care, in one of the 16 funded projects under the auspices of the Teaching and Research in Aged Care Service project. Located in ACT and southern NSW, the Co-operative for Healthy Ageing Research and Teaching (CHART) was comprised of eleven partners from the residential care sector, higher education, and hospital and non-government sectors. A descriptive study of the project engagement and partnership processes and outcomes using documentation review and stakeholder interviews. The overarching goal of the CHART project was to facilitate the development of aged care service models that combine teaching, learning and research. This study describes (i) the processes and investment required to enable care providers to partner in teaching and research activities; and (ii) the structure and practices required to build workforce capacity and create career pathways in the sector. Maintaining consistency of engagement and collaboration required significant, and often invisible, investment in partnership arrangements. Overall, the partnerships were often person, rather than organisation, dependent. New student placements were introduced, but support for continued nursing placements remained variable. Local practice innovation was advanced when partnership investment was aligned at strategic and operational levels. Continuous, and often invisible, investment in maintaining operational partnerships is critical to sustained change. Partnering in a private aged care service environment to achieve sector-wide changes was challenging, but the investment can result in innovation and service improvement. © 2016 AJA Inc.

  6. Finance and supply management project execution plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BENNION, S.I.

    As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes.

  7. The perceptions of pre-service and in-service teachers regarding a project-based STEM approach to teaching science.

    PubMed

    Siew, Nyet Moi; Amir, Nazir; Chong, Chin Lu

    2015-01-01

    Whilst much attention has focused on project-based approaches to teaching Science, Technology, Engineering and Mathematics (STEM) subjects, little has been reported on the views of South-East Asian science teachers on project-based STEM approaches. Such knowledge could provide relevant information for education training institutions on how to influence innovative teaching of STEM subjects in schools. This article reports on a study that investigated the perceptions of 25 pre-service and 21 in-service Malaysian science teachers in adopting an interdisciplinary project-based STEM approach to teaching science. The teachers undertook an eight hour workshop which exposed them to different science-based STEM projects suitable for presenting science content in the Malaysian high school science syllabus. Data on teachers' perceptions were captured through surveys, interviews, open-ended questions and classroom discussion before and at the end of the workshop. Study findings showed that STEM professional development workshops can provide insights into the support required for teachers to adopt innovative, effective, project-based STEM approaches to teaching science in their schools.

  8. Understanding the Manager of the Project Front-End

    NASA Technical Reports Server (NTRS)

    Mulenburg, Gerald M.; Imprescia, Cliff (Technical Monitor)

    2000-01-01

    Historical data and new findings from interviews with managers of major National Aeronautics and Space Administration (NASA) projects confirm literature reports about the criticality of the front-end phase of project development, where systems engineering plays such a key role. Recent research into the management of ten contemporary NASA projects, combined with personal experience of the author in NASA, provide some insight into the relevance and importance of the project manager in this initial part of the project life cycle. The research findings provide evidence of similar approaches taken by the NASA project manager.

  9. The Virtual Factory Teaching System (VFTS): Project Review and Results.

    ERIC Educational Resources Information Center

    Kazlauskas, E. J.; Boyd, E. F., III; Dessouky, M. M.

    This paper presents a review of the Virtual Factory Teaching (VFTS) project, a Web-based, multimedia collaborative learning network. The system allows students, working alone or in teams, to build factories, forecast demand for products, plan production, establish release rules for new work into the factory, and set scheduling rules for…

  10. Practical Project Management for Education and Training.

    ERIC Educational Resources Information Center

    Lockitt, Bill

    This booklet provides a succinct guide to effective management procedures, including whether and how to take on projects, estimation of costs prior to project bids, project management tools, case studies, and practical exercises for staff development activities. Chapter 1 investigates why institutions take on projects, issues involved, benefits…

  11. From Brand Image Research to Teaching Assessment: Using a Projective Technique Borrowed from Marketing Research to Aid an Understanding of Teaching Effectiveness

    ERIC Educational Resources Information Center

    Boddy, Clive Roland

    2004-01-01

    This paper describes how a simple qualitative market research technique using a projective device called a bubble drawing can be used as a useful feedback device to gain an understanding of students' views of the teaching effectiveness of a market research lecture. Comparisons are made with feedback gained from teaching observations and insights…

  12. Teaching project: a low-cost swine model for chest tube insertion training.

    PubMed

    Netto, Fernando Antonio Campelo Spencer; Sommer, Camila Garcia; Constantino, Michael de Mello; Cardoso, Michel; Cipriani, Raphael Flávio Fachini; Pereira, Renan Augusto

    2016-02-01

    to describe and evaluate the acceptance of a low-cost chest tube insertion porcine model in a medical education project in the southwest of Paraná, Brazil. we developed a low-cost and low technology porcine model for teaching chest tube insertion and used it in a teaching project. Medical trainees - students and residents - received theoretical instructions about the procedure and performed thoracic drainage in this porcine model. After performing the procedure, the participants filled a feedback questionnaire about the proposed experimental model. This study presents the model and analyzes the questionnaire responses. seventy-nine medical trainees used and evaluated the model. The anatomical correlation between the porcine model and human anatomy was considered high and averaged 8.1±1.0 among trainees. All study participants approved the low-cost porcine model for chest tube insertion. the presented low-cost porcine model for chest tube insertion training was feasible and had good acceptability among trainees. This model has potential use as a teaching tool in medical education.

  13. Teaching Note--Keeping It Real: Program Evaluation Projects for an Undergraduate Research Class

    ERIC Educational Resources Information Center

    John, Aesha; Bang, Eun-Jun

    2017-01-01

    This article describes a teaching innovation that focused on the redesign of an undergraduate social work research class. Students enrolled in the redesigned class had an opportunity to conduct program evaluation projects in community agencies. The projects included (a) pretest and posttest evaluation of reminiscence approach in improving the…

  14. Student Perceptions in Teaching Principles of Management Information Systems

    ERIC Educational Resources Information Center

    Rob, Mohammad A.; Etnyre, Vance

    2015-01-01

    Teaching concepts of information systems to general business students through a course such as management information systems (MIS) can be challenging in today's fast-changing environment of information technology (IT). Such a course must provide not only an understanding of the development, applications, and management of information systems, but…

  15. Content Management Middleware for the Support of Distributed Teaching

    ERIC Educational Resources Information Center

    Tsalapatas, Hariklia; Stav, John B.; Kalantzis, Christos

    2004-01-01

    eCMS is a web-based federated content management system for the support of distributed teaching based on an open, distributed middleware architecture for the publication, discovery, retrieval, and integration of educational material. The infrastructure supports the management of both standalone material and structured courses, as well as the…

  16. Leading and Managing Learning and Teaching in Higher Education

    ERIC Educational Resources Information Center

    Marshall, Stephen J.; Orrell, Janice; Cameron, Alison; Bosanquet, Agnes; Thomas, Sue

    2011-01-01

    This paper outlines the findings of a study that examined the conceptions of academics regarding the nature of "leading" and "managing" learning and teaching in six Australian universities. These data were considered in the light of institutional systems and documentation regarding the leadership and management of learning and…

  17. Project management plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    DOT National Transportation Integrated Search

    2010-12-01

    The Dallas Integrated Corridor Management System Demonstration Project is a multi-agency, de-centralized operation which will utilize a set of regional systems to integrate the operations of the corridor. The purpose of the Dallas ICM System is to im...

  18. Analysis of interactions among barriers in project risk management

    NASA Astrophysics Data System (ADS)

    Dandage, Rahul V.; Mantha, Shankar S.; Rane, Santosh B.; Bhoola, Vanita

    2018-03-01

    In the context of the scope, time, cost, and quality constraints, failure is not uncommon in project management. While small projects have 70% chances of success, large projects virtually have no chance of meeting the quadruple constraints. While there is no dearth of research on project risk management, the manifestation of barriers to project risk management is a less dwelt topic. The success of project management is oftentimes based on the understanding of barriers to effective risk management, application of appropriate risk management methodology, proactive leadership to avoid barriers, workers' attitude, adequate resources, organizational culture, and involvement of top management. This paper represents various risk categories and barriers to risk management in domestic and international projects through literature survey and feedback from project professionals. After analysing the various modelling methods used in project risk management literature, interpretive structural modelling (ISM) and MICMAC analysis have been used to analyse interactions among the barriers and prioritize them. The analysis indicates that lack of top management support, lack of formal training, and lack of addressing cultural differences are the high priority barriers, among many others.

  19. Advancing Project Management in Learning Organizations

    ERIC Educational Resources Information Center

    Bourne, Lynda; Walker, Derek H. T.

    2004-01-01

    Effective project managers are required to have both "hard" technical skills to help control the iron triangle of time, cost and functional scope as well as relationship management skills to work effectively with people and get the best out of them. This paper argues that project managers also need a third skill: we refer to it as tapping into the…

  20. Teachers Teaching Teachers: The Belen Goals 2000 Professional Development Project.

    ERIC Educational Resources Information Center

    Norton, Priscilla; Sprague, Debra

    Belen Public Schools (New Mexico) received a Goals 2000 grant for teacher education and technology integration. The Belen Goals 2000 professional development project established two three-day teachers-teaching-teachers workshops. The first focused on using an integrated software package and the second focused on using e-mail and the Internet.…

  1. Edulabs AGIRE Project--Evaluation of ICT Integration in Teaching Strategies

    ERIC Educational Resources Information Center

    Pombo, Lúcia; Carlos, Vânia; Loureiro, Maria João

    2017-01-01

    The AGIRE project, under the Edulab concept, aims to promote the adoption of innovative teaching practices. This paper reports the support strategies used to evaluate the teacher practices at the end of a teacher training course (TTC) and analyse its impact on teacher technology integration, using a design-based methodology. Teachers' initial…

  2. Lessons Learned about Post-Tenure Review from the AAHE Peer Review of Teaching Project.

    ERIC Educational Resources Information Center

    Taylor, James W.

    1999-01-01

    Describes use of a strategy adapted from the American Association for Higher Education's Peer Review of Teaching Project, the "reflective memo," to provide backward and forward view of post-tenure reviews in the chemistry department of the University of Wisconsin (Madison). The approach served as a guide in review of research, teaching,…

  3. Project nurse manager: an intrapreneurial role.

    PubMed

    Risner, P B; Anderson, M L

    1994-01-01

    Nurse intrapreneurs are the key to innovation and cost-effective health care in the 1990s. A project nurse manager, acting as a liaison between service departments, can provide the vision and insight for the successful outcome of such projects as product evaluation, unit renovation, and the development of a new facility. The role, benefits, and outcomes of one project nurse manager are described.

  4. Enhanced project management tool

    NASA Technical Reports Server (NTRS)

    Hsu, Chen-Jung (Inventor); Patel, Hemil N. (Inventor); Maluf, David A. (Inventor); Moh Hashim, Jairon C. (Inventor); Tran, Khai Peter B. (Inventor)

    2012-01-01

    A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as one or more of a monthly report, a task plan report, a schedule report, a budget report and a risk management report, are generated and made available for display or further analysis or collection into a customized report template. An extensible database allows searching for information based upon context and upon content. Seven different types of project risks are addressed, including non-availability of required skill mix of workers. The system can be configured to exchange data and results with corresponding portions of similar project analyses, and to provide user-specific access to specified information.

  5. Beyond Portfolios: A Practical Look at Student Projects as Teaching and Evaluation Devices (Part 2).

    ERIC Educational Resources Information Center

    Tillyer, Anthea; Sokolik, Maggi

    1993-01-01

    Steps required for developing a successful project class are described, beginning with an examination of how to use student writing projects with lower proficiency learners. A discussion of how projects can best be used as teaching and evaluation instruments in higher level classes is followed by examples of specific projects and styles. (Contains…

  6. Changes in Convictions and Attitudes to the Teaching Profession and Classroom Management Due to Practical Teaching Experience

    ERIC Educational Resources Information Center

    Gawlitza, Gaby; Perels, Franziska

    2014-01-01

    The aim of this study is to analyze changes in beliefs and attitudes to the teaching profession and to classroom management as a result of teaching experience. The structure of this study is based partly on the COACTIV-model of professional competence of teachers. The COACTIV-model is divided into motivational orientations, convictions and basic…

  7. Software Tools Streamline Project Management

    NASA Technical Reports Server (NTRS)

    2009-01-01

    Three innovative software inventions from Ames Research Center (NETMARK, Program Management Tool, and Query-Based Document Management) are finding their way into NASA missions as well as industry applications. The first, NETMARK, is a program that enables integrated searching of data stored in a variety of databases and documents, meaning that users no longer have to look in several places for related information. NETMARK allows users to search and query information across all of these sources in one step. This cross-cutting capability in information analysis has exponentially reduced the amount of time needed to mine data from days or weeks to mere seconds. NETMARK has been used widely throughout NASA, enabling this automatic integration of information across many documents and databases. NASA projects that use NETMARK include the internal reporting system and project performance dashboard, Erasmus, NASA s enterprise management tool, which enhances organizational collaboration and information sharing through document routing and review; the Integrated Financial Management Program; International Space Station Knowledge Management; Mishap and Anomaly Information Reporting System; and management of the Mars Exploration Rovers. Approximately $1 billion worth of NASA s projects are currently managed using Program Management Tool (PMT), which is based on NETMARK. PMT is a comprehensive, Web-enabled application tool used to assist program and project managers within NASA enterprises in monitoring, disseminating, and tracking the progress of program and project milestones and other relevant resources. The PMT consists of an integrated knowledge repository built upon advanced enterprise-wide database integration techniques and the latest Web-enabled technologies. The current system is in a pilot operational mode allowing users to automatically manage, track, define, update, and view customizable milestone objectives and goals. The third software invention, Query

  8. Multimodal Self-Management: An Holistic Approach to Teaching Self-Improvement.

    ERIC Educational Resources Information Center

    O'Keefe, Edward J.

    This paper describes an innovative approach to teaching a college course on self-management/self-control. Following a brief background statement on the history and applications of self-management, as well as the deficits of traditional self-management instruction, multimodal therapy (Lazarus, 1976, 1981) is discussed as the conceptual framework…

  9. Risk Management of NASA Projects

    NASA Technical Reports Server (NTRS)

    Sarper, Hueseyin

    1997-01-01

    Various NASA Langley Research Center and other center projects were attempted for analysis to obtain historical data comparing pre-phase A study and the final outcome for each project. This attempt, however, was abandoned once it became clear that very little documentation was available. Next, extensive literature search was conducted on the role of risk and reliability concepts in project management. Probabilistic risk assessment (PRA) techniques are being used with increasing regularity both in and outside of NASA. The value and the usage of PRA techniques were reviewed for large projects. It was found that both civilian and military branches of the space industry have traditionally refrained from using PRA, which was developed and expanded by nuclear industry. Although much has changed with the end of the cold war and the Challenger disaster, it was found that ingrained anti-PRA culture is hard to stop. Examples of skepticism against the use of risk management and assessment techniques were found both in the literature and in conversations with some technical staff. Program and project managers need to be convinced that the applicability and use of risk management and risk assessment techniques is much broader than just in the traditional safety-related areas of application. The time has come to begin to uniformly apply these techniques. The whole idea of risk-based system can maximize the 'return on investment' that the public demands. Also, it would be very useful if all project documents of NASA Langley Research Center, pre-phase A through final report, are carefully stored in a central repository preferably in electronic format.

  10. Integrating principles and multidisciplinary projects in design education

    NASA Technical Reports Server (NTRS)

    Nevill, Gale E., Jr.

    1992-01-01

    The critical need to improve engineering design education in the U.S. is presented and a number of actions to achieve that end are discussed. The importance of teaching undergraduates the latest methods and principles through the means of team design in multidisciplinary projects leading to a testable product is emphasized. Desirable training for design instructors is described and techniques for selecting and managing projects that teach effectively are discussed.

  11. "We Are Wyoming": An Arts Integrated Teaching and Inquiry Project

    ERIC Educational Resources Information Center

    Trent, Allen; Moran, Peter

    2018-01-01

    This article is about a year-long teaching and research project conducted with 696 4th graders (mostly 10-year olds) and their 36 teachers in Wyoming/USA. The researchers employed an action research approach. They planned and taught a two-day, Wyoming-themed, interdisciplinary unit, "We Are Wyoming", which integrated Social Studies,…

  12. Introduction to Financial Projection Models. Business Management Instructional Software.

    ERIC Educational Resources Information Center

    Pomeroy, Robert W., III

    This guidebook and teacher's guide accompany a personal computer software program and introduce the key elements of financial projection modeling to project the financial statements of an industrial enterprise. The student will then build a model on an electronic spreadsheet. The guidebook teaches the purpose of a financial model and the steps…

  13. Non-Profit/Higher Education Project Management Series: The Project Plan

    ERIC Educational Resources Information Center

    Burgher, Karl E.; Snyder, Michael

    2012-01-01

    This is the second installment of the AACRAO management series focusing on project management in the academy. In this article, the authors focus on white papers (often called charters, briefs, or fact sheets) and their partner, the work plan. The work plan is a detailed document that defines each aspect of a project. It is often preceded by a…

  14. A Five-Year Retrospective on the Arkansas Department of Education Co-Teaching Project

    ERIC Educational Resources Information Center

    Pearl, Cynthia; Dieker, Lisa Ann; Kirkpatrick, Rose Merry

    2012-01-01

    The Arkansas Department of Education Co-teaching Project was designed to assist Arkansas schools in the implementation of more inclusive service delivery models for students with disabilities. The project began due to a need to increase the number of students being served in less restrictive environments, but evolved into a systematic statewide…

  15. Investigation of Factors Mediating the Effectiveness of Authentic Projects in the Teaching of Elementary Statistics

    ERIC Educational Resources Information Center

    Spence, Dianna J.; Sharp, Julia L.; Sinn, Robb

    2011-01-01

    Four instructors used authentic research projects and related curriculum materials when teaching elementary statistics in secondary and undergraduate settings. Projects were authentic in that students selected their own variables, defined their own research questions, and collected and analyzed their own data. Classes using these projects were…

  16. Searching for evidence of curricular effect on the teaching and learning of mathematics: some insights from the LieCal project

    NASA Astrophysics Data System (ADS)

    Cai, Jinfa

    2014-12-01

    Drawing on evidence from the Longitudinal Investigation of the Effect of Curriculum on Algebra Learning (LieCal) Project, issues related to mathematics curriculum reform and student learning are discussed. The LieCal Project was designed to longitudinally investigate the impact of a reform mathematics curriculum called the Connected Mathematics Project (CMP) in the USA on teachers' teaching and students' learning. Using a three-level conceptualization of curriculum (intended, implemented, and attained), a variety of evidence from the LieCal Project is presented to show the impact of mathematics curriculum reform on teachers' teaching and students' learning. This paper synthesizes findings from the two longitudinal studies spanning 7 years of the LieCal Project both to show the kind of impact curriculum has on teachers' teaching and students' learning and to suggest powerful but feasible ways researchers can investigate curriculum effect on both teaching and learning.

  17. Using Simulation to Teach Project Management in the Professional Writing Classroom

    ERIC Educational Resources Information Center

    Krause, Tim

    2010-01-01

    It hardly bears noting that when writing instructors teach professional writing they focus on helping students learn to analyze complex communication scenarios, conduct careful research to support their position, and to responsibly and succinctly apply the process of writing any number of supporting documents. Developing these skills are essential…

  18. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1992-01-01

    This volume is the fifth in an ongoing series on aerospace project management at NASA. Articles in this volume cover: an overview of the project cycle; SE&I management for manned space flight programs; shared experiences from NASA Programs and Projects - 1975; cost control for Mariner Venus/Mercury 1973; and the Space Shuttle - a balancing of design and politics. A section on resources for NASA managers rounds out the publication.

  19. Program/Project Management Resources: A collection of 50 bibliographies focusing on continual improvement, reinventing government, and successful project management

    NASA Technical Reports Server (NTRS)

    Michaels, Jeffrey

    1994-01-01

    These Program/Project Management Resource Lists were originally written for the NASA project management community. Their purpose was to promote the use of the NASA Headquarters Library Program/Project Management Collection funded by NASA Headquarters Code FT, Training & Development Division, by offering introductions to the management topics studied by today's managers. Lists were also written at the request of NASA Headquarters Code T, Office of Continual improvements, and at the request of NASA members of the National Performance Review. This is the second edition of the compilation of these bibliographies; the first edition was printed in March 1994.

  20. Project management tool

    NASA Technical Reports Server (NTRS)

    Maluf, David A. (Inventor); Bell, David G. (Inventor); Gurram, Mohana M. (Inventor); Gawdiak, Yuri O. (Inventor)

    2009-01-01

    A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as a monthly report, a task plan report, a budget report and a risk management report, are generated and made available for display or further analysis. An extensible database allows searching for information based upon context and upon content.

  1. The TeachScheme! Project: Computing and Programming for Every Student

    ERIC Educational Resources Information Center

    Felleisen, Matthias; Findler, Robert Bruce; Flatt, Matthew; Krishnamurthi, Shriram

    2004-01-01

    The TeachScheme! Project aims to reform three aspects of introductory programming courses in secondary schools. First, we use a design method that asks students to develop programs in a stepwise fashion such that each step produces a well-specified intermediate product. Second, we use an entire series of sublanguages, not just one. Each element of…

  2. The Coffee Project Revisited: Teaching Research Skills to Forensic Chemists

    ERIC Educational Resources Information Center

    Hamnett, Hilary J.; Korb, Ann-Sophie

    2017-01-01

    This study describes a new module design for teaching research skills to analytical chemists based on the use of a student-led, in-class experiment involving coffee. The module was redesigned in response to feedback from students, and aims to give them the skills they need to be productive in future research projects both within the institution…

  3. Augmenting SCA project management and automation framework

    NASA Astrophysics Data System (ADS)

    Iyapparaja, M.; Sharma, Bhanupriya

    2017-11-01

    In our daily life we need to keep the records of the things in order to manage it in more efficient and proper way. Our Company manufactures semiconductor chips and sale it to the buyer. Sometimes it manufactures the entire product and sometimes partially and sometimes it sales the intermediary product obtained during manufacturing, so for the better management of the entire process there is a need to keep the track record of all the entity involved in it. Materials and Methods: Therefore to overcome with the problem the need raised to develop the framework for the maintenance of the project and for the automation testing. Project management framework provides an architecture which supports in managing the project by marinating the records of entire requirements, the test cases that were created for testing each unit of the software, defect raised from the past years. So through this the quality of the project can be maintained. Results: Automation framework provides the architecture which supports the development and implementation of the automation test script for the software testing process. Conclusion: For implementing project management framework the product of HP that is Application Lifecycle management is used which provides central repository to maintain the project.

  4. Draft project management update to the Iowa DOT Project Development Manual : final report.

    DOT National Transportation Integrated Search

    2016-08-01

    This work supported drafting project management guidance for the Iowa Department of Transportation (DOT). The goal is to : incorporate a greater focus on project management in their project development process. : A technical advisory committee (TAC) ...

  5. Bridging the Generation Gap across the Digital Divide: Teens Teaching Internet Skills to Senior Citizens.

    ERIC Educational Resources Information Center

    Kolodinsky, Jane; Cranwell, Michele; Rowe, Ellen

    2002-01-01

    The Teens Teaching Internet Skills Pilot Project engaged youth from 4-H Technology Teams in training senior citizens to obtain information from the Medicare website. The teens perceived an improvement in working with seniors, project management, teaching, public speaking, and leadership. The workshops had a positive effect on seniors' comfort and…

  6. Teacher Change: Ideas Emerging from a Project for the Teaching of University Mathematics

    ERIC Educational Resources Information Center

    Trigueros, Maria; Lozano, Maria-Dolores

    2015-01-01

    This paper reports the changes that occurred in the didactic approaches of three professors who participated in a project intended to develop new ways of teaching mathematics to second year university students. An enactivist perspective is used to address the process of change that emerged as a result from interactions during project meetings. We…

  7. Facilitating Elementary Science Teachers' Implementation of Inquiry-Based Science Teaching

    ERIC Educational Resources Information Center

    Qablan, Ahmad M.; DeBaz, Theodora

    2015-01-01

    Preservice science teachers generally feel that the implementation of inquiry-based science teaching is very difficult to manage. This research project aimed at facilitating the implementation of inquiry-based science teaching through the use of several classroom strategies. The evaluation of 15 classroom strategies from 80 preservice elementary…

  8. Quality of Project Management Education and Training Programmes

    NASA Astrophysics Data System (ADS)

    Bodea, Constanta-Nicoleta; Dascalu, Maria; Coman, Melania

    The paper refers to the factors which influence the quality of training and education on project management. A survey was made and the main results are presented. 81 % of the responses came from China. The rest were professionals of different EU nationalities. The percentage of Project Managers who answered the questions is rather low - 8%. In the "Others" category, we have software developers, financial managers and professors, who are involved in both training on project management, but also as team members or team managers in projects, thus ensuring a balanced overview of both theory and practical issues.

  9. Status of Project Management Education in Pakistan

    ERIC Educational Resources Information Center

    Arain, Faisal Manzoor; Tipu, Syed Awais Ahmad

    2009-01-01

    Emerging contractual delivery systems, collaborative partnerships, new management initiatives, and global product markets require professionals and students to have a broader awareness of construction methods and project management issues. This paper presents the state of the project management education in Pakistan. The analysis is based on…

  10. Project: "Teach 'n' Reach" Learning Handicapped: Developmentally Disabled, Learning Disabled. (Book 3 out of 4.)

    ERIC Educational Resources Information Center

    Kagan, Arleen

    The fourth of five volumes (and the third of four curriculum guides) in the Project Teach 'n' Reach series presents curriculum suggestions to help regular classroom teachers teach nondisabled students about learning handicaps. The developmentally disabled are considered in terms of anatomical structures of the brain, etiology, definition, sensory…

  11. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  12. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...

  13. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...

  14. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...

  15. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  16. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  17. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  18. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...

  19. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  20. Preparing Pre-Service Students to Teach Entrepreneurship and Small Business Management.

    ERIC Educational Resources Information Center

    Husted, Stewart W.

    1983-01-01

    Examines a teacher education course used at Indiana State University that prepares students to teach entrepreneurship and small business management. (Managing Editor, 323 Wirtz, Northern Illinois University, DeKalb, IL 60115) (JOW)

  1. Project Manager Personality as a Factor for Success

    DTIC Science & Technology

    2008-03-01

    the project manager includes planning , 1 organizing, directing, and controlling the project (Program Management Institute, 2004; Kerzner, 2006). By...programs identified 5 percent cost growth per year from 2004 to 2007, costing $165 billion dollars more than originally planned (United States...Bjeirmi, 1996) and point out that good project managers can "contribute to project success, but are unlikely to prevent failure" ( de Witt, 1988, p

  2. 24 CFR 990.275 - Project-based management (PBM).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Project-based management (PBM). 990... URBAN DEVELOPMENT THE PUBLIC HOUSING OPERATING FUND PROGRAM Asset Management § 990.275 Project-based... of rental housing at the project level. Under PBM, these property management services are arranged...

  3. 24 CFR 990.275 - Project-based management (PBM).

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Project-based management (PBM). 990... URBAN DEVELOPMENT THE PUBLIC HOUSING OPERATING FUND PROGRAM Asset Management § 990.275 Project-based... of rental housing at the project level. Under PBM, these property management services are arranged...

  4. 24 CFR 990.275 - Project-based management (PBM).

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Project-based management (PBM). 990... URBAN DEVELOPMENT THE PUBLIC HOUSING OPERATING FUND PROGRAM Asset Management § 990.275 Project-based... of rental housing at the project level. Under PBM, these property management services are arranged...

  5. 24 CFR 990.275 - Project-based management (PBM).

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Project-based management (PBM). 990... URBAN DEVELOPMENT THE PUBLIC HOUSING OPERATING FUND PROGRAM Asset Management § 990.275 Project-based... of rental housing at the project level. Under PBM, these property management services are arranged...

  6. 24 CFR 990.275 - Project-based management (PBM).

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 4 2014-04-01 2014-04-01 false Project-based management (PBM). 990... URBAN DEVELOPMENT THE PUBLIC HOUSING OPERATING FUND PROGRAM Asset Management § 990.275 Project-based... of rental housing at the project level. Under PBM, these property management services are arranged...

  7. Graduate Student Project: Operations Management Product Plan

    ERIC Educational Resources Information Center

    Fish, Lynn

    2007-01-01

    An operations management product project is an effective instructional technique that fills a void in current operations management literature in product planning. More than 94.1% of 286 graduates favored the project as a learning tool, and results demonstrate the significant impact the project had in predicting student performance. The author…

  8. Primary Teachers Conducting Inquiry Projects: Effects on Attitudes towards Teaching Science and Conducting Inquiry

    ERIC Educational Resources Information Center

    van Aalderen-Smeets, Sandra I.; Walma van der Molen, Juliette H.; van Hest, Erna G. W. C. M.; Poortman, Cindy

    2017-01-01

    This study used an experimental, pretest-posttest control group design to investigate whether participation in a large-scale inquiry project would improve primary teachers' attitudes towards teaching science and towards conducting inquiry. The inquiry project positively affected several elements of teachers' attitudes. Teachers felt less anxious…

  9. IS-ENES project management - lessons learnt

    NASA Astrophysics Data System (ADS)

    Parinet, Marie; Guglielmo, Francesca; Joussaume, Sylvie

    2017-04-01

    IS-ENES is the distributed e-infrastructure of models, model data and metadata of the European Network for Earth System Modelling (ENES). It has benefitted from two EC FP7 grants and aims towards further European and national funding to achieve sustainability. We highlight here several challenges related to project management that have risen in the course of these two project-phases spanning 8 years. Some challenges are related to the heterogeneity of the activities within IS-ENES, with different groups working on very diverse activities, not necessarily strictly interdependent. An immediate consequence is the need of implementing and setting up in early phases of the project efficient collection and circulation of information to preserve and reinforce the systemic view of the infrastructure as a whole and the pursuit of common goals, including coordinated provision of services. Toward and beyond such common goals, managing IS-ENES, covering both scientific and more strictly management-related aspects, implies a double-paced approach: besides setting up efficient project workflow, there is the need of setting up longer term objectives. This implies, within the project lifetime, to elaborate and implement a coherent organizational (consistent with scientific goals, funding schemes, research and technology landscape) strategy to pursue these goals beyond the project itself. Furthermore, a series of more generic project management challenges will also be listed and can be gathered around 3 main objectives: ease the internal processes in order to optimize the work, anticipate delays and budget issues, and motivate the project teams by ensuring an efficient internal and external communication.

  10. Individualizing the Teaching of Reading through Test Management Systems.

    ERIC Educational Resources Information Center

    Fry, Edward

    Test management systems are suggested for individualizing the teaching of reading in the elementary classroom. Test management systems start with a list of objectives or specific goals which cover all or some major areas of the learning to read process. They then develop a large number of criterion referenced tests which match the skill areas at…

  11. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1990-01-01

    This volume is the third in an ongoing series on aerospace project management at NASA. Articles in this volume cover the attitude of the program manager, program control and performance measurement, risk management, cost plus award fee contracting, lessons learned from the development of the Far Infrared Absolute Spectrometer (FIRAS), small projects management, and age distribution of NASA scientists and engineers. A section on resources for NASA managers rounds out the publication.

  12. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1991-01-01

    This volume is the third in an ongoing series on aerospace project management at NASA. Articles in this volume cover the attitude of the program manager, program control and performance measurement, risk management, cost plus award fee contracting, lessons learned from the development of the Far Infrared Absolute Spectrometer (FIRAS), small projects management, and age distribution of NASA scientists and engineers. A section on resources for NASA managers rounds out the publication.

  13. Forecast Inaccuracies in Power Plant Projects From Project Managers' Perspectives

    NASA Astrophysics Data System (ADS)

    Sanabria, Orlando

    Guided by organizational theory, this phenomenological study explored the factors affecting forecast preparation and inaccuracies during the construction of fossil fuel-fired power plants in the United States. Forecast inaccuracies can create financial stress and uncertain profits during the project construction phase. A combination of purposeful and snowball sampling supported the selection of participants. Twenty project managers with over 15 years of experience in power generation and project experience across the United States were interviewed within a 2-month period. From the inductive codification and descriptive analysis, 5 themes emerged: (a) project monitoring, (b) cost control, (c) management review frequency, (d) factors to achieve a precise forecast, and (e) factors causing forecast inaccuracies. The findings of the study showed the factors necessary to achieve a precise forecast includes a detailed project schedule, accurate labor cost estimates, monthly project reviews and risk assessment, and proper utilization of accounting systems to monitor costs. The primary factors reported as causing forecast inaccuracies were cost overruns by subcontractors, scope gaps, labor cost and availability of labor, and equipment and material cost. Results of this study could improve planning accuracy and the effective use of resources during construction of power plants. The study results could contribute to social change by providing a framework to project managers to lessen forecast inaccuracies, and promote construction of power plants that will generate employment opportunities and economic development.

  14. Program/project management resource lists

    NASA Technical Reports Server (NTRS)

    1993-01-01

    The Program/Project Management Collection at NASA Headquarters Library is part of a larger initiative by the Training and Development Division, Code FT, NASA Headquarters. The collection is being developed to support the Program/Project Management Initiative which includes the training of NASA managers. These PPM Resource Lists have proven to be a useful method of informing NASA employees nationwide about the subject coverage of the library collection. All resources included on the lists are available at or through NASA Headquarters Library. NASA employees at other Centers may request listed books through interlibrary loan, and listed articles by contacting me by phone, mail, or e-mail.

  15. Basic Burns Management E-Learning: A New Teaching Tool.

    PubMed

    Egro, Francesco M

    Burns teaching is organized only in a few medical schools in the United Kingdom. An e-learning tutorial was developed with the objective of incorporating burns teaching within the medical school curriculum. A 33-webpage e-learning was created, covering topics such as local and general response to burns, assessment of burns, first aid, primary and secondary survey, and referral guidelines. Medical student satisfaction was then evaluated using a 12-question feedback survey rated based on a Likert scale from 1 (very poor) to 5 (very good). The 12-question survey was completed by a total of 18 medical students ranging from second to fourth years (second = 17%, third = 22%, fourth = 61%). While only a couple of students had received prior burns teaching, 50% of the cohort had an interest to pursue surgery as a career. The majority of students (72%) would be interested to have an e-learning module on basic burns management in their medical curriculum. The means of all domains specific to the e-learning were rated as "good" or "very good." Students' rating for ease of use was 87%, usefulness was 88%, relevance to the medical curriculum was 90%, clarity and quality of content were 78% and 83%, respectively, design was 79%, and the overall satisfaction with this e-learning was 87%. The "Basic Burns Management" e-learning tutorial can provide an efficient and effective means of information delivery to medical students and junior doctors, allowing easy and fast incorporation of burns teaching within the medical curriculum and in other medical teaching settings.

  16. Management of major system programs and projects. Handbook

    NASA Technical Reports Server (NTRS)

    1993-01-01

    This Handbook establishes the detailed policies and processes for implementing NMI 7120.4, 'Management of Major System Programs and Projects'. It constitutes a comprehensive source of the specific policies and processes governing management of major development programs/projects and is intended as a resource to the entire program/project management (PPM) community.

  17. Strategic Project Management at the NASA Kennedy Space Center

    NASA Technical Reports Server (NTRS)

    Lavelle, Jerome P.

    2000-01-01

    This paper describes Project Management at NASA's Kennedy Space Center (KSC) from a strategic perspective. It develops the historical context of the agency and center's strategic planning process and illustrates how now is the time for KSC to become a center which has excellence in project management. The author describes project management activities at the center and details observations on those efforts. Finally the author describes the Strategic Project Management Process Model as a conceptual model which could assist KSC in defining an appropriate project management process system at the center.

  18. The Use of Mini-projects in the Teaching of Geotechnics to Civil Engineering Undergraduates.

    ERIC Educational Resources Information Center

    Anderson, W. F.; And Others

    1985-01-01

    Geotechnics (which encompasses soil and rock mechanics, engineering geology, foundation design, and ground engineering methods) is a major component of virtually all civil engineering courses. Show how mini-projects are used to teach this subject. Format of projects, development of presentation skills, and assessment considerations are discussed.…

  19. Teaching Engineering Statistics with Technology, Group Learning, Contextual Projects, Simulation Models and Student Presentations

    ERIC Educational Resources Information Center

    Romeu, Jorge Luis

    2008-01-01

    This article discusses our teaching approach in graduate level Engineering Statistics. It is based on the use of modern technology, learning groups, contextual projects, simulation models, and statistical and simulation software to entice student motivation. The use of technology to facilitate group projects and presentations, and to generate,…

  20. When Serious Project Management is a Critical Business Requirement

    NASA Technical Reports Server (NTRS)

    Jansma, P. A.; Gibby, L.; Chambers, C.; Joines, J.; Egger, R.

    2000-01-01

    When serious project management is a critical business requirement, project managers need to integrate cost, schedule and technical scope of work across the project, and apply earned value management (EVM).

  1. JPL's Approach for Helping Flight Project Managers Meet Today's Management Challenges

    NASA Technical Reports Server (NTRS)

    Leising, Charles J.

    2004-01-01

    All across NASA project managers are facing tough new challenges. NASA has imposed increased oversight and the number of projects at Centers such as JPL has exploded from a handful of large projects to a much greater number of smaller ones. Experienced personnel are retiring at increasing rates and younger, less experienced managers are being rapidly promoted up the ladder. Budgets are capped, competition among NASA Centers and Federally Funded Research and Development Centers (FFRDCs) has increased significantly and there is no longer any tolerance to cost overruns. On top of all this, implementation schedules have been reduced by 25 to 50% to reduce run-out costs, making it even more difficult to define requirements, validate heritage assumptions and make accurate cost estimates during the early phases of the life-cycle.JPL's executive management, under the leadership of the Associate Director for Flight Projects and Mission Success, have attempted to meet these challenges by improving operations in five areas: (1) increased standardization, where it is judged to have significant benefit; (2) better balance and more effective partnering between projects and the line management; (3) increased infrastructure support; (4) improved management training; and (5) more effective review and oversight.

  2. Application of expert systems in project management decision aiding

    NASA Technical Reports Server (NTRS)

    Harris, Regina; Shaffer, Steven; Stokes, James; Goldstein, David

    1987-01-01

    The feasibility of developing an expert systems-based project management decision aid to enhance the performance of NASA project managers was assessed. The research effort included extensive literature reviews in the areas of project management, project management decision aiding, expert systems technology, and human-computer interface engineering. Literature reviews were augmented by focused interviews with NASA managers. Time estimation for project scheduling was identified as the target activity for decision augmentation, and a design was developed for an Integrated NASA System for Intelligent Time Estimation (INSITE). The proposed INSITE design was judged feasible with a low level of risk. A partial proof-of-concept experiment was performed and was successful. Specific conclusions drawn from the research and analyses are included. The INSITE concept is potentially applicable in any management sphere, commercial or government, where time estimation is required for project scheduling. As project scheduling is a nearly universal management activity, the range of possibilities is considerable. The INSITE concept also holds potential for enhancing other management tasks, especially in areas such as cost estimation, where estimation-by-analogy is already a proven method.

  3. The Characteristics of Project Managers: An Exploration of Complex Projects in the National Aeronautics and Space Administration

    NASA Technical Reports Server (NTRS)

    Mulenburg, Gerald M.

    2000-01-01

    Study of characteristics and relationships of project managers of complex projects in the National Aeronautics and Space Administration. Study is based on Research Design, Data Collection, Interviews, Case Studies, and Data Analysis across varying disciplines such as biological research, space research, advanced aeronautical test facilities, aeronautic flight demonstrations, and projects at different NASA centers to ensure that findings were not endemic to one type of project management, or to one Center's management philosophies. Each project is treated as a separate case with the primary data collected during semi-structured interviews with the project manager responsible for the overall project. Results of the various efforts show some definite similarities of characteristics and relationships among the project managers in the study. A model for how the project managers formulated and managed their projects is included.

  4. Project-Based Curriculum for Teaching Analytical Design to Freshman Engineering Students via Reconfigurable Trebuchets

    ERIC Educational Resources Information Center

    Herber, Daniel R.; Deshmukh, Anand P.; Mitchell, Marlon E.; Allison, James T.

    2016-01-01

    This paper presents an effort to revitalize a large introductory engineering course for incoming freshman students that teaches them analytical design through a project-based curriculum. This course was completely transformed from a seminar-based to a project-based course that integrates hands-on experimentation with analytical work. The project…

  5. Issues in NASA Program and Project Management. Special Report: 1997 Conference. Project Management Now and in the New Millennium

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1997-01-01

    Topics Considered Include: NASA's Shared Experiences Program; Core Issues for the Future of the Agency; National Space Policy Strategic Management; ISO 9000 and NASA; New Acquisition Initiatives; Full Cost Initiative; PM Career Development; PM Project Database; NASA Fast Track Studies; Fast Track Projects; Earned Value Concept; Value-Added Metrics; Saturn Corporation Lessons Learned; Project Manager Credibility.

  6. Construction Project Management for RED HORSE Troop Training Projects

    DTIC Science & Technology

    1989-02-02

    estimating, scheduling, and cost control required for project management decision making in RED HORSE construction projects. The expected benefits of...After receiving tentative approval for a project, either the benefiting base engineering section or the appropriate RED HORSE squadron executes the...approved by the benefiting base commander and forwarded to RED HORSE for review. Once the design has started, the benefiting base reports to Headquarters

  7. Theodore Roosevelt High School: Project TEACH, 1984-1985. OEA Evaluation Report.

    ERIC Educational Resources Information Center

    New York City Board of Education, Brooklyn. Office of Educational Assessment.

    Project TEACH completed the first year of a three-year program serving 190 newly arrived limited English proficient (LEP) students from the Caribbean, Central America and Cambodia. Virtually all students belonged to low-income families and many had received little formal education in their native countries. The primary goal was to facilitate…

  8. Project management techniques for highly integrated programs

    NASA Technical Reports Server (NTRS)

    Stewart, J. F.; Bauer, C. A.

    1983-01-01

    The management and control of a representative, highly integrated high-technology project, in the X-29A aircraft flight test project is addressed. The X-29A research aircraft required the development and integration of eight distinct technologies in one aircraft. The project management system developed for the X-29A flight test program focuses on the dynamic interactions and the the intercommunication among components of the system. The insights gained from the new conceptual framework permitted subordination of departments to more functional units of decisionmaking, information processing, and communication networks. These processes were used to develop a project management system for the X-29A around the information flows that minimized the effects inherent in sampled-data systems and exploited the closed-loop multivariable nature of highly integrated projects.

  9. Project Management Meets Change Management - A Success Story. Focus Area: Tech Perspectives TI012SN

    NASA Technical Reports Server (NTRS)

    Hall, Wayne

    2011-01-01

    Utilizing the concepts and terminology from Project Management, the process of planning and executing a Change Management (CM) Infrastructure improvement project is described. The primary audience for this presentation includes both experienced and relatively new CM administrators and their managers. It also includes anyone with an interest in the application of project management knowledge to CM administration. There are several benefits: the complexity of the CM tool technology is more manageable, CM administrators get to use project management knowledge to complete a project (not "firefighting"), improve relations with your customers (that means developers and managers), and get the opportunity to do it again.

  10. Teaching Teachers for the Future (TTF) Project TPACK Survey: Summary of the Key Findings

    ERIC Educational Resources Information Center

    Finger, Glenn; Jamieson-Proctor, Romina; Cavanagh, Rob; Albion, Peter; Grimbeek, Peter; Bond, Trevor; Fitzgerald, Robert; Romeo, Geoff; Lloyd, Margaret

    2013-01-01

    This paper presents a summary of the key findings of the TTF TPACK Survey developed and administered for the Teaching the Teachers for the Future (TTF) Project implemented in 2011. The TTF Project, funded by an Australian Government ICT Innovation Fund grant, involved all 39 Australian Higher Education Institutions which provide initial teacher…

  11. Management of simulated maternal cardiac arrest by residents: didactic teaching versus electronic learning.

    PubMed

    Hards, Andrea; Davies, Sharon; Salman, Aliya; Erik-Soussi, Magda; Balki, Mrinalini

    2012-09-01

    Successful resuscitation of a pregnant woman undergoing cardiac arrest and survival of the fetus require prompt, high-quality cardiopulmonary resuscitation. The objective of this observational study was to assess management of maternal cardiac arrest by anesthesia residents using high-fidelity simulation and compare subsequent performance following either didactic teaching or electronic learning (e-learning). Twenty anesthesia residents were randomized to receive either didactic teaching (Didactic group, n = 10) or e-learning (Electronic group, n = 10) on maternal cardiac arrest. Baseline management skills were tested using high-fidelity simulation, with repeat simulation testing one month after their teaching intervention. The time from cardiac arrest to start of perimortem Cesarean delivery (PMCD) was measured, and the technical and nontechnical skills scores between the two teaching groups were compared. The median [interquartile range] time to PMCD decreased after teaching, from 4.5 min [3.4 to 5.1 min] to 3.5 min [2.5 to 4.0 min] (P = 0.03), although the change within each group was not statistically significant (Didactic group 4.9 to 3.8 min, P = 0.2; Electronic group 3.9 to 2.5 min, P = 0.07; Didactic group vs Electronic group, P = 1.0). Even after teaching, only 65% of participants started PMCD within four minutes. Technical and nontechnical skills scores improved after teaching in both groups, and there were no differences between the groups. There are gaps in the knowledge and implementation of resuscitation protocols and the recommended modifications for pregnancy among residents. Teaching can improve performance during management of maternal cardiac arrest. Electronic learning and didactic teaching offer similar benefits.

  12. 48 CFR 1301.671 - Assignment of program and project managers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... project managers. 1301.671 Section 1301.671 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE..., and Responsibilities 1301.671 Assignment of program and project managers. The Department's Program and Project Manager certification program for the assignment and certification of Program and Project Managers...

  13. Teaching Dance with Online Course Management Systems

    ERIC Educational Resources Information Center

    Colombi, Erika; Knosp, Suzanne

    2017-01-01

    As a result of easier access to and functionality of the Internet, online course management systems (CMSs) began to be developed in the mid-1990s. These technological tools were created to fill a need in the growing field of teaching through online courses.Most notable of these course tools are Blackboard (2015) and Desire2Learn (1999). Both of…

  14. Development of Learning Management in Moral Ethics and Code of Ethics of the Teaching Profession Course

    NASA Astrophysics Data System (ADS)

    Boonsong, S.; Siharak, S.; Srikanok, V.

    2018-02-01

    The purposes of this research were to develop the learning management, which was prepared for the enhancement of students’ Moral Ethics and Code of Ethics in Rajamangala University of Technology Thanyaburi (RMUTT). The contextual study and the ideas for learning management development was conducted by the document study, focus group method and content analysis from the document about moral ethics and code of ethics of the teaching profession concerning Graduate Diploma for Teaching Profession Program. The main tools of this research were the summarize papers and analyse papers. The results of development showed the learning management for the development of moral ethics and code of ethics of the teaching profession for Graduate Diploma for Teaching Profession students could promote desired moral ethics and code of ethics of the teaching profession character by the integrated learning techniques which consisted of Service Learning, Contract System, Value Clarification, Role Playing, and Concept Mapping. The learning management was presented in 3 steps.

  15. Agent-Based Simulations for Project Management

    NASA Technical Reports Server (NTRS)

    White, J. Chris; Sholtes, Robert M.

    2011-01-01

    Currently, the most common approach used in project planning tools is the Critical Path Method (CPM). While this method was a great improvement over the basic Gantt chart technique being used at the time, it now suffers from three primary flaws: (1) task duration is an input, (2) productivity impacts are not considered , and (3) management corrective actions are not included. Today, computers have exceptional computational power to handle complex simulations of task e)(eculion and project management activities (e.g ., dynamically changing the number of resources assigned to a task when it is behind schedule). Through research under a Department of Defense contract, the author and the ViaSim team have developed a project simulation tool that enables more realistic cost and schedule estimates by using a resource-based model that literally turns the current duration-based CPM approach "on its head." The approach represents a fundamental paradigm shift in estimating projects, managing schedules, and reducing risk through innovative predictive techniques.

  16. Servant leadership behaviors of aerospace and defense project managers and their relation to project success

    NASA Astrophysics Data System (ADS)

    Dominik, Michael T.

    The success of a project is dependent in part on the skills, knowledge, and behavior of its leader, the project manager. Despite advances in project manager certifications and professional development, the aerospace and defense industry has continued to see highly visible and expensive project failures partially attributable to failures in leadership. Servant leadership is an emerging leadership theory whose practitioners embrace empowerment, authenticity, humility, accountability, forgiveness, courage, standing back, and stewardship, but has not yet been fully examined in the context of the project manager as leader. The objective of this study was to examine the relationship between servant leadership behaviors demonstrated by aerospace and defense project managers and the resulting success of their projects. Study participants were drawn from aerospace and defense oriented affinity groups from the LinkedInRTM social media web system. The participants rated their project managers using a 30-item servant leadership scale, and rated the success of their project using a 12-item project success scale. One hundred and fifteen valid responses were analyzed from 231 collected samples from persons who had worked for a project manager on an aerospace and defense project within the past year. The results of the study demonstrated statistically significant levels of positive correlation to project success for all eight servant leadership factors independently evaluated. Using multiple linear regression methods, the servant leadership factors of empowerment and authenticity were determined to be substantial and statistically significant predictors of project success. The study results established the potential application of servant leadership as a valid approach for improving outcomes of projects.

  17. Teaching in High-Tech Environments: Classroom Management Revisited.

    ERIC Educational Resources Information Center

    Sandholtz, Judy Haymore; And Others

    Based on weekly reports sent via electronic mail, correspondence between sites, and bi-monthly audiotapes from teachers, this qualitative study analyses data from 32 elementary and secondary Apple Classrooms of Tomorrow (ACOT) teachers in five schools concerning management changes that occurred in teaching and learning in the new computerized…

  18. Cultural differences in Research project management

    NASA Astrophysics Data System (ADS)

    Barbier, Michele

    2016-04-01

    Scientific Projects today have increased in complexity, requiring multidisciplinarity, and requiring a mix of diverse individuals from different countries who must be integrated into an effective project. Effective team building is one of the prime responsibilities of the project manager. When the project is supported by a funding, the integration and the implication of the different partners are quite easy. Particularly when partners are developing high-performing teams. However, management of research project requires further skills when the budget is not very high and/or when partners are from non-European countries and are not using the same vocabulary. The various cultures, values, beliefs and social usages, particularly with Mediterranean countries cause a special style of communication for an individual or group of individuals. This communication style participates in the success of the project and encompasses a lot of diplomatic skills which will be highlighted.

  19. Computer Managed Instruction: An Application in Teaching Introductory Statistics.

    ERIC Educational Resources Information Center

    Hudson, Walter W.

    1985-01-01

    This paper describes a computer managed instruction package for teaching introductory or advanced statistics. The instructional package is described and anecdotal information concerning its performance and student responses to its use over two semesters are given. (Author/BL)

  20. FME Senior Project Managers: A Juggling Act of Multiple Projects | Poster

    Cancer.gov

    By Peggy Pearl, Contributing Writer It was not until the 1950s that organizations in the United States began to apply project management tools and techniques to complex construction and engineering projects (http://en.m.wikipedia.org/wiki/Project_life_cycle).

  1. Technological Enrichment and Achievement for Cambodians and Hispanics: Project TEACH, 1987-88. Evaluation Section Report.

    ERIC Educational Resources Information Center

    Berney, Tomi D.; Alvarez, Rosalyn

    Project TEACH (Technological Enrichment and Achievement for Cambodians and Hispanics) completed the first year of a 2-year extension of federal funding. Administered by Theodore Roosevelt High School's foreign languages and bilingual education department, the project's major goal was to provide students with bilingual instruction in computer…

  2. Connecting University and Student Teaching Experiences through the Jackdaw Kit Project

    ERIC Educational Resources Information Center

    Marshall, Jill

    2010-01-01

    The author shares the challenges faced in her social studies methods class due to the constraints of NCLB. By incorporating the jackdaw kit project within her social studies methods course, her candidates were able to connect what they were talking about in methods and apply it to their students teaching situations where there was little time for…

  3. Teaching Conflict Management Using a Scenario-Based Approach

    ERIC Educational Resources Information Center

    Callanan, Gerard A.; Perri, David F.

    2006-01-01

    In this article, the authors present a framework for the teaching of conflict management in college courses. The framework describes an experiential learning approach for helping individuals understand the influence of contextual factors in the selection of conflict handling strategy. It also includes a comparison of participants' choice of style,…

  4. PACS project management utilizing web-based tools

    NASA Astrophysics Data System (ADS)

    Patel, Sunil; Levin, Brad; Gac, Robert J., Jr.; Harding, Douglas, Jr.; Chacko, Anna K.; Radvany, Martin; Romlein, John R.

    2000-05-01

    As Picture Archiving and Communications Systems (PACS) implementations become more widespread, the management of deploying large, multi-facility PACS will become a more frequent occurrence. The tools and usability of the World Wide Web to disseminate project management information obviates time, distance, participant availability, and data format constraints, allowing for the effective collection and dissemination of PACS planning, implementation information, for a potentially limitless number of concurrent PACS sites. This paper will speak to tools, such as (1) a topic specific discussion board, (2) a 'restricted' Intranet, within a 'project' Intranet. We will also discuss project specific methods currently in use in a leading edge, regional PACS implementation concerning the sharing of project schedules, physical drawings, images of implementations, site-specific data, point of contacts lists, project milestones, and a general project overview. The individual benefits realized for the end user from each tool will also be covered. These details will be presented, balanced with a spotlight on communication as a critical component of any project management undertaking. Using today's technology, the web arguably provides the most cost and resource effective vehicle to facilitate the broad based, interactive sharing of project information.

  5. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1988-01-01

    This collection of papers and resources on aerospace management issues is inspired by a desire to benefit from the lessons learned from past projects and programs. Inherent in the NASA culture is a respect for divergent viewpoints and innovative ways of doing things. This publication presents a wide variety of views and opinions. Good management is enhanced when program and project managers examine the methods of veteran managers, considering the lessons they have learned and reflected on their own guiding principles.

  6. National Project III, Elevating the Importance of Teaching. Fund Associate's Final Report.

    ERIC Educational Resources Information Center

    Seibert, Warren F.

    Purdue University's participation as a fund associate in National Project III (NP III) for elevating the importance of teaching has its origins in a flexible and diagnostic instructional evaluation system called "CAFETERIA." CAFETERIA services include test development, scoring, and analysis; social surveys on topics of importance in…

  7. Strategies for Effective Dissemination of the Outcomes of Teaching and Learning Projects

    ERIC Educational Resources Information Center

    Southwell, Deborah; Gannaway, Deanne; Orrell, Janice; Chalmers, Denise; Abraham, Catherine

    2010-01-01

    This paper describes an empirical study that addresses the question of how higher education institutions can disseminate effectively the outcomes of projects that seek to achieve large-scale change in teaching and learning. Traditionally, dissemination of innovation and good practice is strongly advocated within universities, but little…

  8. Taking a Leap of Faith: Redefining Teaching and Learning in Higher Education through Project-Based Learning

    ERIC Educational Resources Information Center

    Lee, Jean S.; Blackwell, Sue; Drake, Jennifer; Moran, Kathryn A.

    2014-01-01

    This study examines two aspects of teaching with a project-based learning (PBL) model in higher education settings: faculty definitions of PBL and faculty PBL practices, as evidenced by their self-described successes and challenges in implementation. Faculty participants took "a leap of faith" in their teaching practices to redefine what…

  9. Project management; considerations for success.

    PubMed

    Maas, Jos

    2013-01-01

    During the past two years the author was a project leader for three Information Communication Technology (ICT) security related systems projects for a newly built healthcare facility. These projects were: a CCTV system, an Access Control system and an Identity & Access Management system. During those two years he gained experiences on how to coop with ICT projects related to security and healthcare as well as some pitfalls to be contended with along the way. With this article, he shares his experiences so that colleagues can benefit from them when they are a project leaders for their health facility and need to better decide how or how not to address their project and project issues.

  10. Managing Small Spacecraft Projects: Less is Not Easier

    NASA Technical Reports Server (NTRS)

    Barley, Bryan; Newhouse, Marilyn

    2012-01-01

    Managing small, low cost missions (class C or D) is not necessarily easier than managing a full flagship mission. Yet, small missions are typically considered easier to manage and used as a training ground for developing the next generation of project managers. While limited resources can be a problem for small missions, in reality most of the issues inherent in managing small projects are not the direct result of limited resources. Instead, problems encountered by managers of small spacecraft missions often derive from 1) the perception that managing small projects is easier if something is easier it needs less rigor and formality in execution, 2) the perception that limited resources necessitate or validate omitting standard management practices, 3) less stringent or unclear guidelines or policies for small projects, and 4) stakeholder expectations that are not consistent with the size and nature of the project. For example, the size of a project is sometimes used to justify not building a full, detailed integrated master schedule. However, while a small schedule slip may not be a problem for a large mission, it can indicate a serious problem for a small mission with a short development phase, highlighting the importance of the schedule for early identification of potential issues. Likewise, stakeholders may accept a higher risk posture early in the definition of a low-cost mission, but as launch approaches this acceptance may change. This presentation discusses these common misconceptions about managing small, low cost missions, the problems that can result, and possible solutions.

  11. Project - based teaching and other methods to make learning more attractive

    NASA Astrophysics Data System (ADS)

    Švecová, Libuše; Vlková, Iva

    2017-01-01

    This contribution presents the results of a research carried out at secondary schools in the Moravian-Silesian Region. This research involved a total of 120 pupils and focused on project teaching with the emphasis on pupil inquiry activity and the connection of their knowledge in the fields of physics and biology. To verify pupil inquiry activity, the tasks on the worksheets have been designed specifically to measure physical quantities on the human body by computer-aided measuring processes. To support pupil inquiry activity, group work was selected as the organization method of teaching. Audio recording and pedagogical observations were used as the research tools for assessment and a consequent evaluation of acquired data.

  12. Using a Virtual National Park to Teach Workplace Skills in Conservation Management

    ERIC Educational Resources Information Center

    Howard, Jonathon Leigh

    2011-01-01

    Teaching conservation management means more than just learning about solving complex and difficult environmental issues. Such learning must also consider the likely administrative context that students will end up working in. This article outlines the development of a role-play that uses online technology to teach several administrative processes…

  13. Managed lanes handbook training : year 2 report of activities.

    DOT National Transportation Integrated Search

    2009-02-01

    This report summarizes the Year 2 activities under Implementation Project 5-4160-01, Managed Lanes : Handbook Training. The overall objective of the project is to develop a 12-hour workshop covering The : Managed Lanes Handbook, and teach the materia...

  14. Influence of the economy crisis on project cost management

    NASA Astrophysics Data System (ADS)

    Simankina, Tatyana; Ćetković, Jasmina; Verstina, Natalia; Evseev, Evgeny

    2017-10-01

    Economy crisis significantly affects primarily the project cost management. The article considers the problems of project management in the field of housing under conditions of economy crisis. Project budgets are reduced, their mutual interference grows and framework of risks changes. Apparently, specific approaches are required to be developed to optimize the expenses and guarantee the project implementation within the approved budget. There is considered domestic and foreign experience in terms of project cost management with involvement of BIM technologies.

  15. Teaching Lawyering With Heart in the George Washington University Law School Domestic Violence Project.

    PubMed

    Meier, Joan

    2016-10-01

    The Domestic Violence Project (DVP) began as an experiment but has become my favorite model for teaching law students about domestic violence work. The heart of the course is its emphasis on developing awareness of and compassion for the personally and emotionally challenging dimensions of domestic violence work. I achieve this (i) through an intensive and personal dialogue with students through written journals and responses; (ii) by inviting students to consider creative expression for their final project, and (iii) by teaching students about vicarious trauma and encouraging their understanding of it in themselves and other system players. Students seem to experience this course as an oasis of holistic professional and personal growth within the often dispiriting experience of law school. © The Author(s) 2016.

  16. How Configuration Management Helps Projects Innovate and Communicate

    NASA Technical Reports Server (NTRS)

    Cioletti, Louis A.; Guidry, Carla F.

    2009-01-01

    This slide presentation reviews the concept of Configuration Management (CM) and compares it to the standard view of Project management (PM). It presents two PM models: (1) Kepner-Tregoe,, and the Deming models, describes why projects fail, and presents methods of how CM helps projects innovate and communicate.

  17. Academy for the Advancement of Teaching and Management.

    ERIC Educational Resources Information Center

    New Jersey State Dept. of Education, Trenton.

    In response to the national impetus for improvement in education, New Jersey officials have proposed the creation of the Academy for the Advancement of Teaching and Management, an organization designed to raise the standards of professional skills for teachers and principals. The organization will train teachers and administrators for 2 years in…

  18. Exploitation and Benefits of BIM in Construction Project Management

    NASA Astrophysics Data System (ADS)

    Mesároš, Peter; Mandičák, Tomáš

    2017-10-01

    BIM is increasingly getting into the awareness in construction industry. BIM is the process of creating and data managing of the building during its life cycle. BIM became a part of management tools in modern construction companies. Construction projects have a number of participants. It means difficulty process of construction project management and a serious requirement for processing the huge amount of information including design, construction, time and cost parameters, economic efficiency and sustainability. Progressive information and communication technologies support cost management and management of construction project. One of them is Building Information Modelling. Aim of the paper is to examine the impact of BIM exploitation and benefits on construction project management in Slovak companies.

  19. NAESA Augmentation Pilot Project

    NASA Technical Reports Server (NTRS)

    Hoover, John J.

    1998-01-01

    This project was one project within the Native American Earth and Space Academy (NAESA). NAESA is a national initiative comprised of several organizations that support programs which focus on 1) enhancing the technological, scientific and pedagogical skills of K-14 teachers who instruct Native Americans, 2) enhancing the understanding and applications of science, technology, and engineering of college-bound Native Americans and teaching them general college "survival skills" (e.g., test taking, time management, study habits), 3) enhancing the scientific and pedagogical skills of the faculty of tribally-controllcd colleges and community colleges with large Native American enrollments, and 4) strengthening the critical relationships between students, their parents, tribal elders, and their communities. This Augmentation Pilot Project focused on the areas of community-school alliances and intemet technology use in teaching and learning and daily living addressing five major objectives.

  20. Data Overload Impact on Project Management: How Knowledge Management Systems Can Improve Federal Agencies Effectiveness

    ERIC Educational Resources Information Center

    Rodriguez, Jacinto

    2013-01-01

    This mixed method exploratory case study was used to explore the effect data overload has on project management, how data overload affects project management effectiveness, how prepared program office staff is to manage multiple projects effectively, and how the program office's organizational structure and data management systems affect project…

  1. The integrated scheduling system: A case study in project management

    NASA Technical Reports Server (NTRS)

    Bishop, Peter C.; Learned, David B.; Yoes, Cissy A.

    1989-01-01

    A prototype project management system was developed for the Level III Project Office for the Space Station Freedom. The main goal was to establish a framework for the Space Station Project Office whereby Project and Office Managers can jointly establish and review scheduled milestones and activities. The objective was to assist office managers in communicating their objectives, milestones, schedules, and other project information more effectively and efficiently. Consideration of sophisticated project management systems was included, but each of the systems had limitations in meeting the stated objectives.

  2. "It's Really Making a Difference": How Small-Scale Research Projects Can Enhance Teaching and Learning

    ERIC Educational Resources Information Center

    Dexter, Barbara; Seden, Roy

    2012-01-01

    Following an internal evaluation exercise, using Action Research, this paper identifies the positive impact of small-scale research projects on teaching and learning at a single case study UK University. Clear evidence is given of how the projects benefited students and staff, and enhanced institutional culture. Barriers to better practice are…

  3. Teaching Reprint File Management: Basic Principles and Software Programs.

    ERIC Educational Resources Information Center

    Wood, Elizabeth H.

    1989-01-01

    Describes a workshop for teaching library users how to manage reprint files which was developed at the University of Southern California Norris Medical Library. Software programs designed for this purpose are suggested, and a sidebar lists software features to consider. (eight references) (MES)

  4. A Symbiosis between Instructional Systems Design and Project Management

    ERIC Educational Resources Information Center

    Pan, Cheng-Chang

    2012-01-01

    This study is intended to explore a complementary relationship between instructional systems design (ISD) and project management in an attempt to build a plausible case for integrating project management as a distinct course in the core of the graduate instructional systems design programs. It is argued that ISD and project management should form…

  5. [Healthcare manager and project management of quality improvement : analysis of managerial action using a professional hands-on training in project management].

    PubMed

    Dujardin, Pierre-Philippe; Reverdy, Thomas; Valette, Annick; François, Patrice

    2016-06-01

    Introduction : project management is on the expected proficiencies for head nurses. Context : The work on the organizations’ improvement carried out by head nurses, is rarely covered in the literature. Objectives : to follow the implementation of actions from projects led by head nurses and to analyze the parameters of success. Method : for a year, an intervention study has followed 17 projects initiating improvement measures. Semistructured interviews were conducted with health-care teams and managers. All of them reported the results of the implementation of each measure as an operational improvement. A mixed analysis containing a logistic regression investigated associations between the result of the action and the various contextual characteristics. Results : this study involved 111 actions. 71 % of them concluded an operational improvement. The organizational and supporting actions had a high success rate, which decreased when hazards were not managed by healthcare managers. Discussion : this study highlights the place of strategies through the implementing methods and the chosen actions. Recommendations are made in order to promote a collective assessment. Conclusion : scientific approaches are proposed to discuss the organizational work.

  6. A Qualitative Study of the Relationship between a Banking IT Troubled Project and the Executive Project Sponsor's Project Management Maturity Level

    ERIC Educational Resources Information Center

    Northcraft, Terry G.

    2017-01-01

    This qualitative study examined the effect the level of project management maturity a banking IT project sponsor has on project success. Project management maturity is gauged by the amount of modern project management training, knowledge and organizational skills an individual or organization has and applies to their project lifecycle experiences.…

  7. Methodology of project management at implementation of projects of high-rise construction

    NASA Astrophysics Data System (ADS)

    Papelniuk, Oksana

    2018-03-01

    High-rise construction is the perspective direction in urban development. An opportunity to arrange on rather small land plot a huge number of the living and commercial space makes high-rise construction very attractive for developers. However investment projects of high-rise buildings' construction are very expensive and complex that sets a task of effective management of such projects for the company builder. The best tool in this area today is the methodology of project management, which becomes a key factor of efficiency.

  8. Project management in the development of scientific software

    NASA Astrophysics Data System (ADS)

    Platz, Jochen

    1986-08-01

    This contribution is a rough outline of a comprehensive project management model for the development of software for scientific applications. The model was tested in the unique environment of the Siemens AG Corporate Research and Technology Division. Its focal points are the structuring of project content - the so-called phase organization, the project organization and the planning model used, and its particular applicability to innovative projects. The outline focuses largely on actual project management aspects rather than associated software engineering measures.

  9. The PI-Mode of Project Management

    NASA Technical Reports Server (NTRS)

    Isaac, Dan

    1997-01-01

    The PI-Mode is NASA's new approach to project management. It responds to the Agency's new policy to develop scientific missions that deliver the highest quality science for a fixed cost. It also attempts to provide more research opportunities by reducing project development times and increasing the number of launches per year. In order to accomplish this, the Principal Investigator is placed at the helm of the project with full responsibility over all aspects of the mission, including instrument and spacecraft development, as well as mission operations and data analysis. This paper intends to study the PI-Mode to determine the strengths and weaknesses of such a new project management technique. It also presents an analysis of its possible impact on the scientific community and its relations with industry, NASA, and other institutions.

  10. Teaching guatemala midwives about postpartum hemorrhage.

    PubMed

    Garcia, Kimberly; Morrison, Fellow Barbara; Savrin, Carol

    2012-01-01

    To evaluate the effect of a culturally sensitive teaching unit on traditional midwives' knowledge of nursing interventions to prevent and treat postpartum hemorrhage (PPH). Sixteen midwives participated in a 1-day training program at a Refuge International Health Clinic in the remote town of Sarstun, Guatemala. The quasi experimental study used a one-group, pretest-posttest design. Researchers used a PPH Behavioral Checklist from the American College of Nurse Midwives (ACNM) to assess and compare knowledge of PPH interventions before and after the PPH teaching. The final analysis included 13 traditional midwives as the subjects. The culturally sensitive teaching improved traditional midwives' knowledge and skills about nursing interventions to manage PPH (pretest M = 1.385/8, posttest M = 4.846/8). Results of this pilot project suggest a culturally sensitive oral teaching in the primary language of the participants positively affects traditional midwives' knowledge and skills to manage PPH. Future training should be presented in a similar format to meet the needs of illiterate audiences in resource-poor settings.

  11. Project management practice and its effects on project success in Malaysian construction industry

    NASA Astrophysics Data System (ADS)

    Haron, N. A.; Devi, P.; Hassim, S.; Alias, A. H.; Tahir, M. M.; Harun, A. N.

    2017-12-01

    The rapid economic development has increased the demand for construction of infrastructure and facilities globally. Sustainable development and globalization are the new ‘Zeitgeist’ of the 21st century. In order to implement these projects successfully and to meet the functional aim of the projects within their lifetime, an efficient project management practice is needed. The aim of this study is to identify the critical success factors (CSFs) and the extent of use of project management practice which affects project success, especially during the implementation stage. Data were obtained from self-administered questionnaires with 232 respondents. A mixed method of data collection was adopted using semi-structured interview and questionnaire approach. The result of the analysis of data obtained showed that new and emerging criteria such as customer satisfaction, competency of the project team, and performance of subcontractors/suppliers are becoming measures of success in addition to the classic iron triangle’s view of time, cost and quality. An insight on the extent of use of different project management practice in the industry was also achieved from the study.

  12. Against all odds: Tales of survival and growth of the Foundational Approaches in Science Teaching (FAST) project

    NASA Astrophysics Data System (ADS)

    Yamamoto, Karen Kina

    ) teaching and learning strategies that model a community of practicing scientists. This study also identified the main elements of professional development strategies essential for an innovative project's survival and growth: linking curriculum development to required pre-implementation inservice training, engaging project personnel in both of these phases recruiting, training a cadre of experienced FAST teachers as inservice trainers, and providing follow-up professional development seminars. In conclusion, the FAST project survived mainly because the longevity of its leaders gave stability and continuity to the project. Against many odds such as limited financial resources and a small number of staff positions relative to the project's scope, the leaders managed with whatever resources were available to link theory-based curriculum development with professional development and, thereby, increase the project's chances for survival and growth.

  13. Project management in the Apollo program: An interdisciplinary study

    NASA Technical Reports Server (NTRS)

    Drucker, E. E.; Pooler, W. S.; Wilemon, D. L.; Wood, B. D.

    1972-01-01

    Findings concerning project management in the NASA Apollo program are presented. The Apollo program in the context of the total NASA organization is examined along with the nature of project management and the manner in which project managers functioned in the Apollo program. The utilization of the in-house technical competence in the support of the Apollo program, and the formal and informal relationships between Apollo managers and the contractors are discussed.

  14. Spent Nuclear Fuel Project Configuration Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Reilly, M.A.

    This document is a rewrite of the draft ``C`` that was agreed to ``in principle`` by SNF Project level 2 managers on EDT 609835, dated March 1995 (not released). The implementation process philosphy was changed in keeping with the ongoing reengineering of the WHC Controlled Manuals to achieve configuration management within the SNF Project.

  15. Teaching Community-Based Learning Course in Retailing Management

    ERIC Educational Resources Information Center

    Rhee, Eddie

    2018-01-01

    This study outlines the use of a community-based learning (CBL) applied to a Retailing Management course conducted in a 16-week semester in a private institution in the East Coast. The study addresses the case method of teaching and its potential weaknesses, and discusses experiential learning for a real-world application. It further addresses CBL…

  16. Construction project management handbook : September 2009.

    DOT National Transportation Integrated Search

    2009-09-01

    The purpose of this Handbook is to provide guidelines for use by public transit agencies (Agencies) undertaking substantial construction : projects, either for the first time or with little prior experience with construction project management. It pr...

  17. Children's Questions and Science Teaching: An Alternative Approach. [and] Floating and Sinking: Some Teaching Suggestions. Learning in Science Project (Primary). Working Paper No. 117 [February 1984 and November 1983 Versions].

    ERIC Educational Resources Information Center

    Biddulph, Fred; Osborne, Roger

    Two booklets were developed by the Learning in Science Project (Primary)--LISP(P)--to help teachers adopt an approach to primary science teaching which would enhance children's understanding of floating and sinking. Both booklets were designed to enable teachers to reconceptualize their teaching task from activity-driven, didactic teaching to…

  18. Critical Success Factors in Teaching Strategic Sales Management: Evidence from Client-Based Classroom and Web-Based Formats

    ERIC Educational Resources Information Center

    Jaskari, Harri; Jaskari, Minna-Maarit

    2016-01-01

    The importance of sales management as an interface between a company and its customers is widely recognized. However, the teaching of strategic sales management has not received enough attention in marketing education literature. This study analyzes an experiential client-based method for teaching a strategic sales management course. The authors…

  19. The Field Project as a Tool for Teaching Environmental Psychology.

    ERIC Educational Resources Information Center

    Howells, Gary N.

    1978-01-01

    Describes a university class project designed to enable students to translate environmental research into action. Students focused on a conflict between state and county government over solid waste management. Outlines steps involved in such a project and discusses student involvement and the success of the project. (KC)

  20. Implementation of a Project Management Office (PMO)--experiences from year 1.

    PubMed

    Isola, Miriam; Polikaitis, Audrius; Laureto, Rose Ann

    2006-01-01

    Recognized as an early leader in clinical information systems, the University of Illinois Medical Center was challenged to meet the ever-increasing demand for information systems. Interviews with key stakeholders revealed unfavorable attitudes toward the Information Services department. Reasons given were that projects often are not aligned with business strategy, projects are delayed, IS itself is a barrier to progress, and a lack of proactive planning precipitates crises. Under the leadership of a new CIO, IS began developing a Project Management Office, or PMO, to better meet medical center business objectives and to more effectively manage technology projects. Successes during the first year included comprehensive IT strategic planning. Collaborative relationships were established with departmental leaders for planning, prioritizing, budgeting, and executing projects. A formal Web-based process for requesting IS projects was implemented, project management training was provided, and elements of standard project management methodology were implemented. While a framework for effective project management was created, significant effort is still required to firmly root these new processes within the organizational culture. Project management office goals for the second year include implementing a project portfolio management tool, refining the benefits methodology, and continuing the advancement of the project management methodology.

  1. Does teaching crisis resource management skills improve resuscitation performance in pediatric residents?*.

    PubMed

    Blackwood, Jaime; Duff, Jonathan P; Nettel-Aguirre, Alberto; Djogovic, Dennis; Joynt, Chloe

    2014-05-01

    The effect of teaching crisis resource management skills on the resuscitation performance of pediatric residents is unknown. The primary objective of this pilot study was to determine if teaching crisis resource management to residents leads to improved clinical and crisis resource management performance in simulated pediatric resuscitation scenarios. A prospective, randomized control pilot study. Simulation facility at tertiary pediatric hospital. Junior pediatric residents. Junior pediatric residents were randomized to 1 hour of crisis resource management instruction or no additional training. Time to predetermined resuscitation tasks was noted in simulated resuscitation scenarios immediately after intervention and again 3 months post intervention. Crisis resource management skills were evaluated using the Ottawa Global Rating Scale. Fifteen junior residents participated in the study, of which seven in the intervention group. The intervention crisis resource management group placed monitor leads 24.6 seconds earlier (p = 0.02), placed an IV 47.1 seconds sooner (p = 0.04), called for help 50.4 seconds faster (p = 0.03), and checked for a pulse after noticing a rhythm change 84.9 seconds quicker (p = 0.01). There was no statistically significant difference in time to initiation of cardiopulmonary resuscitation (p = 0.264). The intervention group had overall crisis resource management performance scores 1.15 points higher (Ottawa Global Rating Scale [out of 7]) (p = 0.02). Three months later, these differences between the groups persisted. A 1-hour crisis resource management teaching session improved time to critical initial steps of pediatric resuscitation and crisis resource management performance as measured by the Ottawa Global Rating Scale. The control group did not develop these crisis resource management skills over 3 months of standard training indicating that obtaining these skills requires specific education. Larger studies of crisis resource education are

  2. Experiences in managing the Prometheus Project

    NASA Technical Reports Server (NTRS)

    Lehman, David H.; Clark, Karla B.; Cook, Beverly A.; Gavit, Sarah A.; Kayali, Sammy A.; McKinney, John C.; Milkovich, David C.; Reh, Kim R.; Taylor, Randall L.; Casani, John R.

    2006-01-01

    Congress authorized NASA?s Prometheus Project in February 2003, with the first Prometheus mission slated to explore the icy moons of Jupiter. The Project had two major objectives: (1) to develop a nuclear reactor that would provide unprecedented levels of power and show that it could be processed safely and operated reliably in space for long-duration, deep-space exploration and (2) to explore the three icy moons of Jupiter - Callisto, Ganymede, and Europa - and return science data that would meet the scientific goals as set forth in the Decadal Survey Report of the National Academy of Sciences. Early in Project planning, it was determined that the development of the Prometheus nuclear powered Spaceship would be complex and require the intellectual knowledge residing at numerous organizations across the country. In addition, because of the complex nature of the Project and the multiple partners, approaches beyond those successfully used to manage a typical JPL project would be needed. This paper1 will describe the key experiences in managing Prometheus that should prove useful for future projects of similar scope and magnitude

  3. Including information technology project management in the nursing informatics curriculum.

    PubMed

    Sockolow, Paulina; Bowles, Kathryn H

    2008-01-01

    Project management is a critical skill for nurse informaticists who are in prominent roles developing and implementing clinical information systems. It should be included in the nursing informatics curriculum, as evidenced by its inclusion in informatics competencies and surveys of important skills for informaticists. The University of Pennsylvania School of Nursing includes project management in two of the four courses in the master's level informatics minor. Course content includes the phases of the project management process; the iterative unified process methodology; and related systems analysis and project management skills. During the introductory course, students learn about the project plan, requirements development, project feasibility, and executive summary documents. In the capstone course, students apply the system development life cycle and project management skills during precepted informatics projects. During this in situ experience, students learn, the preceptors benefit, and the institution better prepares its students for the real world.

  4. Project Management in NASA: The system and the men

    NASA Technical Reports Server (NTRS)

    Pontious, R. H.; Barnes, L. B.

    1973-01-01

    An analytical description of the NASA project management system is presented with emphasis on the human element. The NASA concept of project management, program managers, and the problems and strengths of the NASA system are discussed.

  5. A Statistical Project Control Tool for Engineering Managers

    NASA Technical Reports Server (NTRS)

    Bauch, Garland T.

    2001-01-01

    This slide presentation reviews the use of a Statistical Project Control Tool (SPCT) for managing engineering projects. A literature review pointed to a definition of project success, (i.e., A project is successful when the cost, schedule, technical performance, and quality satisfy the customer.) The literature review also pointed to project success factors, and traditional project control tools, and performance measures that are detailed in the report. The essential problem is that with resources becoming more limited, and an increasing number or projects, project failure is increasing, there is a limitation of existing methods and systematic methods are required. The objective of the work is to provide a new statistical project control tool for project managers. Graphs using the SPCT method plotting results of 3 successful projects and 3 failed projects are reviewed, with success and failure being defined by the owner.

  6. Assessing the Relationship between Ethical Project Management and Information Technology Project Success

    ERIC Educational Resources Information Center

    Howell, Byron Winter

    2010-01-01

    The purpose of this quantitative study was to assess the relationship between ethical project management and information technology (IT) project success. The success of IT projects is important for organizational success, but the rate of IT projects is historically low, costing billions of dollars annually. Using four key ethical variables…

  7. Effective Time Management in the Project Office. Executive Summary.

    DTIC Science & Technology

    1976-11-05

    manager. It can be concluded from the study that project managers have difficulty in managing their time and that although neglected, time management should...be taught to project managers so as to preclude spending an inordinate amount of time to accomplish their job. An understanding and use of the time ... management principles delineated in the study should allow the manager to make much more effective use of his available time. (Author)

  8. Fusion Teaching: Utilizing Course Management Technology to Deliver an Effective Multimodal Pedagogy

    ERIC Educational Resources Information Center

    Childs, Bradley D.; Cochran, Howard H.; Velikova, Marieta

    2013-01-01

    Fusion teaching merges several pedagogies into a coherent whole. Course management technology allows for the digitization and delivery of pedagogies in an effective and exciting manner. Online course management options more easily enable outcome assessment and monitoring for continuous improvement.

  9. Teaching Integrity in Empirical Research: A Protocol for Documenting Data Management and Analysis

    ERIC Educational Resources Information Center

    Ball, Richard; Medeiros, Norm

    2012-01-01

    This article describes a protocol the authors developed for teaching undergraduates to document their statistical analyses for empirical research projects so that their results are completely reproducible and verifiable. The protocol is guided by the principle that the documentation prepared to accompany an empirical research project should be…

  10. Using electronic document management systems to manage highway project files.

    DOT National Transportation Integrated Search

    2011-12-12

    "WisDOTs Bureau of Technical Services is interested in learning about the practices of other state departments of : transportation in developing and implementing an electronic document management system to manage highway : project files"

  11. Project: "Teach 'n' Reach" Physically Handicapped: Physical and Health Impaired, Visually Impaired. (Book 4 out of 4.)

    ERIC Educational Resources Information Center

    Kagan, Arleen

    The final volume (the fifth in the series and the fourth curriculum guide) in Project Teach 'n' Reach, a program designed to teach nondisabled students about disabilities, focuses on physical disabilities. Information on goals, performance objectives, and activity procedures are presented for topics dealing with physical and health impairments,…

  12. Managing risks in the project pipeline.

    DOT National Transportation Integrated Search

    2013-08-01

    This research focuses on how to manage the risks of project costs and revenue uncertainties over the long-term, and identifies significant : process improvements to ensure projects are delivered on time and as intended, thus maximizing the miles pave...

  13. Meaningful Learning in the Teaching of Culture: The Project Based Learning Approach

    ERIC Educational Resources Information Center

    Kean, Ang Chooi; Kwe, Ngu Moi

    2014-01-01

    This paper reports on a collaborative effort taken by a team of three teacher educators in using the Project Based Learning (PBL) approach in the teaching of Japanese culture with the aim to investigate the presence of actual "meaningful learning" among 15 students of a 12-Week Preparatory Japanese Language course under a teacher…

  14. The Somethingness of Learning Plans: A Scholarship of Teaching and Learning Project

    ERIC Educational Resources Information Center

    Lui, Kat E.

    2005-01-01

    Every attempt to teach or learn occurs in the context of what the learner already knows. This project investigates how the use of learning plans (constructed through instructor and student collaboration) facilitated learning. These plans were used as a means to identify previous knowledge and to motivate students to reflect on their own learning…

  15. When Theory Meets Practice: A New Approach for Teaching Undergraduate Sales Management Courses

    ERIC Educational Resources Information Center

    O'Reilly, Kelley A.

    2015-01-01

    Most sales management undergraduate courses teach students about sales management rather than how to successfully manage a sales team. A desire to change this paradigm resulted in a newly designed hands-on, skill-based sales management course that uses business case studies in combination with students developing, practicing, and performing the…

  16. Adoption of Building Information Modelling in project planning risk management

    NASA Astrophysics Data System (ADS)

    Mering, M. M.; Aminudin, E.; Chai, C. S.; Zakaria, R.; Tan, C. S.; Lee, Y. Y.; Redzuan, A. A.

    2017-11-01

    An efficient and effective risk management required a systematic and proper methodology besides knowledge and experience. However, if the risk management is not discussed from the starting of the project, this duty is notably complicated and no longer efficient. This paper presents the adoption of Building Information Modelling (BIM) in project planning risk management. The objectives is to identify the traditional risk management practices and its function, besides, determine the best function of BIM in risk management and investigating the efficiency of adopting BIM-based risk management during the project planning phase. In order to obtain data, a quantitative approach is adopted in this research. Based on data analysis, the lack of compliance with project requirements and failure to recognise risk and develop responses to opportunity are the risks occurred when traditional risk management is implemented. When using BIM in project planning, it works as the tracking of cost control and cash flow give impact on the project cycle to be completed on time. 5D cost estimation or cash flow modeling benefit risk management in planning, controlling and managing budget and cost reasonably. There were two factors that mostly benefit a BIM-based technology which were formwork plan with integrated fall plan and design for safety model check. By adopting risk management, potential risks linked with a project and acknowledging to those risks can be identified to reduce them to an acceptable extent. This means recognizing potential risks and avoiding threat by reducing their negative effects. The BIM-based risk management can enhance the planning process of construction projects. It benefits the construction players in various aspects. It is important to know the application of BIM-based risk management as it can be a lesson learnt to others to implement BIM and increase the quality of the project.

  17. Development of funding project risk management tools.

    DOT National Transportation Integrated Search

    2013-11-01

    Funding project risk management is a process for identifying, assessing, and prioritizing project funding risks. To plan to : minimize or eliminate the impact of negative events, one must identify what projects have higher risk to respond to potentia...

  18. Managing Complex Distance Education Projects in a Telework Environment

    ERIC Educational Resources Information Center

    Ally, Mohamed; Cleveland-Innes, Marti; Wiseman, Colin

    2010-01-01

    The advances of communication technologies have allowed professionals to work on distance education projects in a telework environment. Managers of these projects must have the skills to manage the projects from a distance. They must be able to select the appropriate team members to work on the project, orient team members, and monitor team…

  19. Elementary Classroom Management. A Handbook of Excellence in Teaching.

    ERIC Educational Resources Information Center

    Charles, C. M.

    Described as differing from most books about teaching, this handbook deals with what teachers identify as their greatest concerns. These concerns are uniformly matters of classroom management (such as discipline, time, pressure, effectiveness, and working with parents). The first chapter of the handbook, which provides an overview of classroom…

  20. Transportation engineering project management : survey of practice.

    DOT National Transportation Integrated Search

    2017-01-01

    Utah Department of Transportation (UDOT) project managers (PMs) have identified inefficiencies in the legacy : system electronic Program Management (ePM) used to manage consultant contracts and invoices. To help UDOT : prepare for potential system im...

  1. Simple Tools to Facilitate Project Management of a Nursing Research Project.

    PubMed

    Aycock, Dawn M; Clark, Patricia C; Thomas-Seaton, LaTeshia; Lee, Shih-Yu; Moloney, Margaret

    2016-07-01

    Highly organized project management facilitates rigorous study implementation. Research involves gathering large amounts of information that can be overwhelming when organizational strategies are not used. We describe a variety of project management and organizational tools used in different studies that may be particularly useful for novice researchers. The studies were a multisite study of caregivers of stroke survivors, an Internet-based diary study of women with migraines, and a pilot study testing a sleep intervention in mothers of low-birth-weight infants. Project management tools were used to facilitate enrollment, data collection, and access to results. The tools included protocol and eligibility checklists, event calendars, screening and enrollment logs, instrument scoring tables, and data summary sheets. These tools created efficiency, promoted a positive image, minimized errors, and provided researchers with a sense of control. For the studies described, there were no protocol violations, there were minimal missing data, and the integrity of data collection was maintained. © The Author(s) 2016.

  2. We Scrum Every Day: Using Scrum Project Management Framework for Group Projects

    ERIC Educational Resources Information Center

    Pope-Ruark, Rebecca

    2012-01-01

    Collaborative group projects have documented learning benefits, yet collaboration is challenging for students because the educational system values individual achievement. This article explores Scrum, an approach to framing, planning, and managing group projects used in Web-software development. Designed for multi-faceted projects, this approach…

  3. A multilevel study of the impact of project manager's leadership on extra-role performance of project team members

    NASA Astrophysics Data System (ADS)

    Shokory, Suzyanty Mohd; Suradi, Nur Riza Mohd

    2018-04-01

    The current study examines the impact of transformational and transactional leadership of project manager on the extra-role performance of project team members. In addition, this study also identifies factor dominant to extra-role performance of project team members when the transformational and transactional leadership of project managers are analyzed simultaneously. The study involved 175 of project team members from 35 project teams (each project team consists of different contracting companies registered in the Selangor (N = 175 from 35 contractors company). A multilevel analysis with hierarchical linear modeling (HLM) approach was used in this study. The analysis showed that transformational and transactional leadership of the project manager is a positive significant with extra-role performance project team members when analyzed separately. However when the two constructs (transformational leadership and transactional leadership of project manager) were analyzed simultaneously, transformational leadership was found to have more impact on extra-role performance project team members compared to transactional leadership. These findings explained that although transformational and transactional leadership of project managers can improve extra-role performance project team members, but this study has proved that transformational leadership of project managers affect extra-role performance project team members more as compared to transactional leadership.

  4. Learning the ABCs (of Project Management)

    NASA Technical Reports Server (NTRS)

    Frandsen, Allan

    2003-01-01

    To lead a project effectively, one has to establish and maintain the flexibility to take appropriate actions when needed. Overconstrained situations should be avoided. To get on top of matters and stay there, a manager needs to anticipate what it will take to successfully complete the job. Physical and financial resources, personnel, and management structure are all important considerations. Carving out the necessary turf up front can make a world of difference to the project's outcome. After the "what," "where," and "when" of a project are nailed down, the next question is "how" to do the job. When I first interviewed for the job of Science Payload Manager on the Advanced Composition (ACE) Explorer mission, Dr. Edward Stone (ACE Principal Investigator) asked, "Al, give me an idea of your management style." It was a question I had not considered before. I thought about it for a few seconds and then answered, "Well, the first descriptive term that comes to mind is the word "tranquility". That seemed to startle him. So I added, "I guess what I mean is, that if the situation is tranquil and the project is running smoothly, then I've anticipated all the problems and taken necessary actions to head them off." He then asked: "Have you ever reached this state?" "No," I admitted, "but I strive for it." That seemed to satisfy him because I got the job.

  5. ITEMS Project: An online sequence for teaching mathematics and astronomy

    NASA Astrophysics Data System (ADS)

    Martínez, Bernat; Pérez, Josep

    2010-10-01

    This work describes an elearning sequence for teaching geometry and astronomy in lower secondary school created inside the ITEMS (Improving Teacher Education in Mathematics and Science) project. It is based on results from the astronomy education research about studentsŠ difficulties in understanding elementary astronomical observations and models. The sequence consists of a set of computer animations embedded in an elearning environment aimed at supporting students in learning about astronomy ideas that require the use of geometrical concepts and visual-spatial reasoning.

  6. Risk Management in Construction Project: Taking Fairness into Account

    NASA Astrophysics Data System (ADS)

    Górecki, Jarosław; Bizon-Górecka, Jadwiga

    2017-10-01

    Risk management requires a comprehensive review of possible hazards, their possible outcomes as well as some recommendations about minimizing the risk. The study emphasises that the project risk management refers to an analysis of the risk factors and a creation of the strategy minimising negative effects of the risk. It was pointed out that a construction project is this kind of projects that can be defined as a unique process of high complexity (design documentation, various stages of creating the building), which has clearly defined time frames and a given financial limit. It is executed as a team work, by qualified or highly qualified specialists of different matters, for example masonry, precast, etc. Additionally, it requires a use of modern equipment and an adequate preparation of the investment. Therefore, the risk management focuses on the problems allowing for troubleshooting. A basis of the risk management is to recognise the fundamentals, which are crucial for the construction project management, i.e. an object perspective, including technological, supporting and management processes as well as an entity perspective - project stakeholders. Construction projects require also an acquaintance with the specificity of the branch. The article refers to the risk management in construction project and, in particular, a phenomenon of participants’ fairness in such projects. The problem of fairness of the entities involved in a project should be understood as a fair play, according to the arrangements agreed in a contract and compatible with current formal procedures and social rules. It was indicated that fairness can be treated as an important factor in predicting the success of such projects. Interviews conducted among contractors in Kuyavian-Pomeranian region showed varied fairness requirements put to individual participants of construction projects. The article presents results of the research. It shows a desired attitude of the surveyed enterprises

  7. A Project-Based Learning Approach to Teaching Physics for Pre-Service Elementary School Teacher Education Students

    ERIC Educational Resources Information Center

    Goldstein, Olzan

    2016-01-01

    This paper describes the impact of the project-based learning (PBL) approach on learning and teaching physics from the perspective of pre-service elementary school teacher education students and an instructor. This approach promoted meaningful learning (mainly in the scope of projects), higher motivation, and active involvement of students in…

  8. Teaching practical leadership in MIT satellite development class: CASTOR and Exoplanet projects

    NASA Astrophysics Data System (ADS)

    Babuscia, Alessandra; Craig, Jennifer L.; Connor, Jane A.

    2012-08-01

    For more than a decade, the Aeronautics and Astronautics Department at MIT has offered undergraduate students the opportunity of conceiving, developing, implementing and operating new spacecraft's missions. During a three term class, junior and senior students experience all the challenges of a true engineering team project: design, analysis, testing, technical documentation development, team management, and leadership. Leadership instruction is an important part of the curricula; through the development of leadership skills, students learn to manage themselves and each other in a more effective way, increasing the overall productivity of the team. Also, a strong leadership education is a key factor in improving the abilities of future engineers to be effective team members and leaders in the companies and agencies in which they will work. However, too often leadership instruction is presented in an abstract way, which does not provide students with suggestions for immediate applicability. As a consequence, students underestimate the potential that leadership education can have on the development of their projects. To counteract that effect, a new approach for teaching "practical" leadership has been developed. This approach is composed of a set of activities developed to improve students' leadership skills in the context of a project. Specifically, this approach has been implemented in the MIT satellite development class. In that class, students experienced the challenges of building two satellites: CASTOR and Exoplanet. These two missions are real space projects which will be launched in the next two years, and which involve cooperation with different entities (MIT, NASA, and Draper). Hence, the MIT faculty was interested in developing leadership activities to improve the productivity of the teams in a short time. In fact, one of the key aspects of the approach proposed is that it can be quickly implemented in a single semester, requiring no more than 4 h of

  9. A success paradigm for project managers in the aerospace industry

    NASA Astrophysics Data System (ADS)

    Bauer, Barry Jon

    Within the aerospace industry, project managers traditionally have been selected based on their technical competency. While this may lead to brilliant technical solutions to customer requirements, a lack of management ability can result in failed programs that over-run on cost, are late to critical path schedules, fail to fully utilize the diversity of talent available within the program team, and otherwise disappoint key stakeholders. This research study identifies the key competencies that a project manager should possess in order to successfully lead and manage a project in the aerospace industry. The research attempts to show evidence that within the aerospace industry, it is perceived that management competency is more important to project management success than only technical competence.

  10. Teaching Project Management

    ERIC Educational Resources Information Center

    Portz, Stephen M.

    2014-01-01

    Many studies support the fact that students participating in projectbased learning experiences show significantly higher learning gains than traditional instructional methods (Frank and Barzilai, 2006). Stephen Portz believes many educators recognize this, but because TPBL is fraught with so many challenges, many teachers avoid it or use it only…

  11. An Examination of Assistant Professors' Project Management Practices

    ERIC Educational Resources Information Center

    Alpert, Shannon Atkinson; Hartshorne, Richard

    2013-01-01

    Purpose: The purpose of this research was to identify factors that influence the use of project management in higher education research projects by investigating the project management practices of assistant professors. Design/methodology/approach: Using a grounded theory approach that included in-depth, semi-structured interviews with 22…

  12. NASA Space Flight Program and Project Management Handbook

    NASA Technical Reports Server (NTRS)

    Blythe, Michael P.; Saunders, Mark P.; Pye, David B.; Voss, Linda D.; Moreland, Robert J.; Symons, Kathleen E.; Bromley, Linda K.

    2014-01-01

    This handbook is a companion to NPR 7120.5E, NASA Space Flight Program and Project Management Requirements and supports the implementation of the requirements by which NASA formulates and implements space flight programs and projects. Its focus is on what the program or project manager needs to know to accomplish the mission, but it also contains guidance that enhances the understanding of the high-level procedural requirements. (See Appendix C for NPR 7120.5E requirements with rationale.) As such, it starts with the same basic concepts but provides context, rationale, guidance, and a greater depth of detail for the fundamental principles of program and project management. This handbook also explores some of the nuances and implications of applying the procedural requirements, for example, how the Agency Baseline Commitment agreement evolves over time as a program or project moves through its life cycle.

  13. Implementing History and Philosophy in Science Teaching: Strategies, Methods, Results and Experiences from the European HIPST Project

    ERIC Educational Resources Information Center

    Hottecke, Dietmar; Henke, Andreas; Riess, Falk

    2012-01-01

    This paper presents a rationale for utilizing HPS to teach physics and the NoS developed in the course of a project funded by the European Union. A core feature of this approach is formed by the development of historical case studies for the use in lessons. Furthermore, the learners' perspectives are explicitly taken into account. Teaching methods…

  14. The Human Element of Project Management

    ERIC Educational Resources Information Center

    Gillard, Sharlett

    2017-01-01

    Much research and dialogue have been published about project management. Studies have been conducted regarding the impact of size, member location, gender composition, cross-functional structure, stakeholder influence, confidence issues, technology usage, management style, generational differences, technical expertise vs. people skills, and a…

  15. 36 CFR 327.30 - Shoreline Management on Civil Works Projects.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ADMINISTERED BY THE CHIEF OF ENGINEERS § 327.30 Shoreline Management on Civil Works Projects. (a) Purpose. The... this regulation, shoreline management plans are not required for those projects where construction was... approval, one copy of each project Shoreline Management Plan will be forwarded to HQUSACE (CECW-ON) WASH DC...

  16. Teaching Strategies to Increase Nursing Student Acceptance and Management of Unconscious Bias.

    PubMed

    Schultz, Paula L; Baker, Janet

    2017-11-01

    Medical providers' unconscious biases may contribute to health disparities. Awareness and self-reflection strategies commonly used to teach cultural competence in academic settings are generally ineffective in reducing unconscious bias or motivating change. This article describes the innovative teaching strategies implemented in a graduate setting (N = 75) to increase nursing learners' acceptance and management of unconscious bias. Strategies used guided the debriefing and feedback that incorporated implicit association testing, interactive audience polling, categorized management strategies, and perspective taking. Strategies resulted in positive learner feedback, including a high likelihood to learn more about unconscious bias, acceptance of unconscious bias influence on health disparities, and importance of using management strategies to address personal bias. Increasingly diverse patient populations require nurses who have the skills to understand, assess, and correct unconscious biases. To accomplish this goal, consistent exposure to unconscious bias curricula that includes focused debriefing, feedback, and management strategies is needed at all levels of nursing education. [J Nurs Educ. 2017;56(11):692-696.]. Copyright 2017, SLACK Incorporated.

  17. Project Management in Instructional Design: ADDIE Is Not Enough

    ERIC Educational Resources Information Center

    Van Rooij, Shahron Williams

    2010-01-01

    In the digital age, instructional designers must possess both a sound instructional design knowledge base and solid project management skills that will enable them to complete courseware projects on time, on budget and in conformance with client expectations. Project management skills include the ability to apply repeatable processes, along with…

  18. Leveraging Text Content for Management of Construction Project Documents

    ERIC Educational Resources Information Center

    Alqady, Mohammed

    2012-01-01

    The construction industry is a knowledge intensive industry. Thousands of documents are generated by construction projects. Documents, as information carriers, must be managed effectively to ensure successful project management. The fact that a single project can produce thousands of documents and that a lot of the documents are generated in a…

  19. Practicing Learner-Centered Teaching: Pedagogical Design and Assessment of a Second Life Project

    ERIC Educational Resources Information Center

    Schiller, Shu Z.

    2009-01-01

    Guided by the principles of learner-centered teaching methodology, a Second Life project is designed to engage students in active learning of virtual commerce through hands-on experiences and teamwork in a virtual environment. More importantly, an assessment framework is proposed to evaluate the learning objectives and learning process of the…

  20. JPL Year 2000 Project. A Project Manager's Observations: Y2k

    NASA Technical Reports Server (NTRS)

    Mathison, Richard P. (Technical Monitor)

    1999-01-01

    This paper presents observations from a project manager on the Y2K problem. The topics include: 1) Agenda: 2) Scope; 3) Project Organization; 4) The Fixes; 5) The Toughest Part; 6) Validation versus Time; and 7) Information Sources. This paper is in viewgraph form.

  1. Promoting addiction medicine teaching through functional mentoring by co-training generalist chief residents with faculty mentors.

    PubMed

    Alford, Daniel P; Carney, Brittany L; Jackson, Angela H; Brett, Belle; Bridden, Carly; Winter, Michael; Samet, Jeffrey H

    2018-02-16

    Generalist physicians should play a vital role in identifying and managing individuals with substance use but are inadequately trained to do so. This 5-year (2008-2012) controlled educational study assessed whether internal medicine and family medicine chief residents' (CRs) addiction medicine teaching increased by co-training with faculty mentors at a Chief Resident Immersion Training (CRIT) program in addiction medicine. All CRIT CR attendees identified a residency program faculty mentor to support addiction medicine teaching after CRIT through functional mentoring with a focus on developing and implementing an Addiction Medicine Teaching Project ("Teaching Project"). Approximately half of the CRs attended CRIT with their mentor (co-trained) and half without their mentor (solo-trained). Addiction medicine teaching outcomes were compared between groups using 6- and 11-month questionnaires and 4 bimonthly teaching logs. Of co-trained CRs, mentor characteristics that positively influenced addiction medicine teaching outcomes were identified. One hundred CRs from 74 residency programs attended CRIT from 2008 to 2012; 47 co-trained with their mentors and 53 solo-trained without their mentors. At 6-month follow-up, the co-trained CRs were more likely to meet at least monthly with their mentor (22.7% vs. 9.6%, P < .01) and more likely to identify their mentor as a facilitator for Teaching Project implementation (82.2% vs. 38.5%, P < .01). At 11-month follow-up, a higher percentage of co-trained CRs had completed their Teaching Project (34.0% vs. 15.1%, P < .05). Both CR groups had similarly large increases in other addiction medicine teaching outcomes. Mentors with more experience, including years of teaching, was associated with better CR Teaching Project outcomes. Co-training generalist chief residents with a faculty mentor appeared to facilitate functional mentoring-driven Teaching Project implementation but did not further increase already high levels of other

  2. Correlational Study of Risk Management and Information Technology Project Success

    ERIC Educational Resources Information Center

    Gillespie, Seth J.

    2014-01-01

    Many IT projects fail despite the best efforts to keep these projects within budget, schedule, and scope. Few studies have looked at the effect of project risk management tools and techniques on project success. The primary focus of this study was to examine the extent to which utilization of project risk management processes influence project…

  3. Requirements management: keeping your technology acquisition project under control.

    PubMed

    Carr, J J

    2000-03-01

    Whether you are acquiring clinical or business information systems, patient monitoring systems, or therapeutic and diagnostic systems, the odds are good that the project will be delivered late, will cost far more than predicted, and will not provide all the features promised. The principal reason for project failure is improper management of the requirements of the system. Requirements engineering and management is a skill from the systems engineering profession that can be learned by nearly any professional who is managing a technology acquisition project. The author discusses what requirements engineering and management is and how it is done.

  4. Tools for Teaching Change Management: The Matrix of Change and Supporting Software.

    ERIC Educational Resources Information Center

    Brynjolfsson, Erik; van Alstyne, Marshall; Bernstein, Abraham; Renshaw, Amy Austin

    This paper presents recent developments in provision of support tools for change management and explains how they have been effectively used for teaching students about information technology (IT)-enabled change management in the core IT classes at MIT (Massachusetts Institute of Technology) and Stanford University (California). It also describes…

  5. Evaluation on Collaborative Satisfaction for Project Management Team in Integrated Project Delivery Mode

    NASA Astrophysics Data System (ADS)

    Zhang, L.; Li, Y.; Wu, Q.

    2013-05-01

    Integrated Project Delivery (IPD) is a newly-developed project delivery approach for construction projects, and the level of collaboration of project management team is crucial to the success of its implementation. Existing research has shown that collaborative satisfaction is one of the key indicators of team collaboration. By reviewing the literature on team collaborative satisfaction and taking into consideration the characteristics of IPD projects, this paper summarizes the factors that influence collaborative satisfaction of IPD project management team. Based on these factors, this research develops a fuzzy linguistic method to effectively evaluate the level of team collaborative satisfaction, in which the authors adopted the 2-tuple linguistic variables and 2-tuple linguistic hybrid average operators to enhance the objectivity and accuracy of the evaluation. The paper demonstrates the practicality and effectiveness of the method through carrying out a case study with the method.

  6. Instructional Design and Project Management: Complementary or Divergent?

    ERIC Educational Resources Information Center

    van Rooij, Shahron Williams

    2011-01-01

    This paper reports the results of a study to identify the extent to which organizations that develop educational/training products are committed to project management, as measured by their project management implementation maturity, as a methodology that is separate and distinct from the processes of instructional design. A Web survey was…

  7. Project TEACH: A Capacity-Building Training Program for Community-Based Organizations and Public Health Agencies.

    PubMed

    Sauaia, Angela; Tuitt, Nicole R; Kaufman, Carol E; Hunt, Cerise; Ledezma-Amorosi, Mariana; Byers, Tim

    2016-01-01

    Project TEACH (Teaching Equity to Advance Community Health) is a capacity-building training program to empower community-based organizations and regional public health agencies to develop data-driven, evidence-based, outcomes-focused public health interventions. TEACH delivers training modules on topics such as logic models, health data, social determinants of health, evidence-based interventions, and program evaluation. Cohorts of 7 to 12 community-based organizations and regional public health agencies in each of the 6 Colorado Area Health Education Centers service areas participate in a 2-day training program tailored to their specific needs. From July 2008 to December 2011, TEACH trained 94 organizations and agencies across Colorado. Training modules were well received and resulted in significant improvement in knowledge in core content areas, as well as accomplishment of self-proposed organizational goals, grant applications/awards, and several community-academic partnerships.

  8. Crawler Acquisition and Testing Demonstration Project Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DEFIGH-PRICE, C.

    2000-10-23

    If the crawler based retrieval system is selected, this project management plan identifies the path forward for acquiring a crawler/track pump waste retrieval system, and completing sufficient testing to support deploying the crawler for as part of a retrieval technology demonstration for Tank 241-C-104. In the balance of the document, these activities will be referred to as the Crawler Acquisition and Testing Demonstration. During recent Tri-Party Agreement negotiations, TPA milestones were proposed for a sludge/hard heel waste retrieval demonstration in tank C-104. Specifically one of the proposed milestones requires completion of a cold demonstration of sufficient scale to support finalmore » design and testing of the equipment (M-45-03G) by 6/30/2004. A crawler-based retrieval system was one of the two options evaluated during the pre-conceptual engineering for C-104 retrieval (RPP-6843 Rev. 0). The alternative technology procurement initiated by the Hanford Tanks Initiative (HTI) project, combined with the pre-conceptual engineering for C-104 retrieval provide an opportunity to achieve compliance with the proposed TPA milestone M-45-03H. This Crawler Acquisition and Testing Demonstration project management plan identifies the plans, organizational interfaces and responsibilities, management control systems, reporting systems, timeline and requirements for the acquisition and testing of the crawler based retrieval system. This project management plan is complimentary to and supportive of the Project Management Plan for Retrieval of C-104 (RPP-6557). This project management plan focuses on utilizing and completing the efforts initiated under the Hanford Tanks Initiative (HTI) to acquire and cold test a commercial crawler based retrieval system. The crawler-based retrieval system will be purchased on a schedule to support design of the waste retrieval from tank C-104 (project W-523) and to meet the requirement of proposed TPA milestone M-45-03H. This Crawler

  9. Use of a Knowledge Management System in Waste Management Projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gruendler, D.; Boetsch, W.U.; Holzhauer, U.

    2006-07-01

    In Germany the knowledge management system 'WasteInfo' about waste management and disposal issues has been developed and implemented. Beneficiaries of 'WasteInfo' are official decision makers having access to a large information pool. The information pool is fed by experts, so called authors This means compiling of information, evaluation and assigning of appropriate properties (metadata) to this information. The knowledge management system 'WasteInfo' has been introduced at the WM04, the operation of 'WasteInfo' at the WM05. The recent contribution describes the additional advantage of the KMS being used as a tool for the dealing with waste management projects. This specific aspectmore » will be demonstrated using a project concerning a comparative analysis of the implementation of repositories in six countries using nuclear power as examples: The information of 'WasteInfo' is assigned to categories and structured according to its origin and type of publication. To use 'WasteInfo' as a tool for the processing the projects, a suitable set of categories has to be developed for each project. Apart from technical and scientific aspects, the selected project deals with repository strategies and policies in various countries, with the roles of applicants and authorities in licensing procedures, with safety philosophy and with socio-economic concerns. This new point of view has to be modelled in the categories. Similar to this, new sources of information such as local and regional dailies or particular web-sites have to be taken into consideration. In this way 'WasteInfo' represents an open document which reflects the current status of the respective repository policy in several countries. Information with particular meaning for the German repository planning is marked and by this may influence the German strategy. (authors)« less

  10. Scaffolding Project-Based Learning with the Project Management Body of Knowledge (PMBOK[R])

    ERIC Educational Resources Information Center

    van Rooij, Shahron Williams

    2009-01-01

    This paper reports the results of a study of the extent to which processes and procedures from the discipline of project management can scaffold online project-based learning in a graduate-level instructional technology course, by facilitating intra-team interaction, enhancing project outcomes and promoting a positive project team experience. With…

  11. The Role of the Project Management Office on Information Technology Project Success

    ERIC Educational Resources Information Center

    Stewart, Jacob S.

    2010-01-01

    The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. Assessing critical success factors is another…

  12. Teaching strategies for assessing and managing urinary incontinence in older adults.

    PubMed

    Bradway, Christine; Cacchione, Pamela

    2010-07-01

    Urinary incontinence is common and affects many aspects of older adults' lives; therefore, it is essential that nursing faculty include this content in classroom and clinical teaching situations. This article describes innovative strategies for teaching upper-level nursing students (e.g., junior and senior undergraduates) about urinary incontinence in older adults, specifically, the relevant anatomy and physiology of continence and associated pathophysiology of urinary incontinence, risk factors and consequences, definitions and types, and effective nursing assessment and management strategies. Copyright 2010, SLACK Incorporated.

  13. Chernobyl post-accident management: the ETHOS project.

    PubMed

    Dubreuil, G H; Lochard, J; Girard, P; Guyonnet, J F; Le Cardinal, G; Lepicard, S; Livolsi, P; Monroy, M; Ollagnon, H; Pena-Vega, A; Pupin, V; Rigby, J; Rolevitch, I; Schneider, T

    1999-10-01

    ETHOS is a pilot research project supported by the radiation protection research program of the European Commission (DG XII). The project provides an alternative approach to the rehabilitation of living conditions in the contaminated territories of the CIS in the post-accident context of Chernobyl. Initiated at the beginning of 1996, this 3-y project is currently being implemented in the Republic of Belarus. The ETHOS project involves an interdisciplinary team of European researchers from the following institutions: the Centre d'etude sur l'Evaluation de la Protection dans le domaine Nucleaire CEPN (radiological protection, economics), the Institute National d'Agronomie de Paris-Grignon INAPG (agronomy, nature & life management), the Compiegne University of Technology (technological and industrial safety, social trust), and the Mutadis Research Group (sociology, social risk management), which is in charge of the scientific co-ordination of the project. The Belarussian partners in the ETHOS project include the Ministry of Emergencies of Belarus as well as the various local authorities involved with the implementation site. The ETHOS project relies on a strong involvement of the local population in the rehabilitation process. Its main goal is to create conditions for the inhabitants of the contaminated territories to reconstruct their overall quality of life. This reconstruction deals with all the day-to-day aspects that have been affected or threatened by the contamination. The project aims at creating a dynamic process whereby acceptable living conditions can be rebuilt. Radiological security is developed in the ETHOS project as part of a general improvement in the quality of life. The approach does not dissociate the social and the technical dimensions of post-accident management. This is so as to avoid radiological risk assessment and management being reduced purely to a problem for scientific experts, from which local people are excluded, and to take into

  14. Teacher Pay for Performance: Experimental Evidence from the Project on Incentives in Teaching

    ERIC Educational Resources Information Center

    Springer, Matthew G.; Hamilton, Laura; McCaffrey, Daniel F.; Ballou, Dale; Le, Vi-Nhuan; Pepper, Matthew; Lockwood, J. R.; Stecher, Brian M.

    2010-01-01

    In an effort to explore the impact of performance incentives in education, the National Center on Performance Incentives (NCPI) partnered with the Metropolitan Nashville Public Schools (MNPS) to conduct the Project on Incentives in Teaching, or POINT. The study examines the effects on student outcomes of paying eligible teachers bonuses of up to…

  15. Strengthening Teaching and Research Links: The Case of a Pollution Exposure Inquiry Project

    ERIC Educational Resources Information Center

    Spronken-Smith, Rachel; Kingham, Simon

    2009-01-01

    In recent years there has been a move towards the strengthening of teaching and research links in the undergraduate curriculum. Inquiry-based learning offers an opportunity for students to engage in research tasks and consequently students can develop valuable research skills, as well as working on projects aligned to staff research interests.…

  16. Design and practice of a comprehensively functional integrated management information system for major construction

    NASA Astrophysics Data System (ADS)

    Liu, Yuling; Wang, Xiaoping; Zhu, Yuhui; Fei, Lanlan

    2017-08-01

    This paper introduces a Comprehensively Functional Integrated Management Information System designed for the Optical Engineering Major by the College of Optical Science and Engineering, Zhejiang University, which combines the functions of teaching, students learning, educational assessment and management. The system consists of 5 modules, major overview, online curriculum, experiment teaching management, graduation project management and teaching quality feedback. The major overview module introduces the development history, training program, curriculums and experiment syllabus and teaching achievements of optical engineering major in Zhejiang University. The Management Information System is convenient for students to learn in a mobile and personalized way. The online curriculum module makes it very easy for teachers to setup a website for new curriculums. On the website, teachers can help students on their problems about the curriculums in time and collect their homework online. The experiment teaching management module and the graduation project management module enables the students to fulfill their experiment process and graduation thesis under the help of their supervisors. Before students take an experiment in the lab, they must pass the pre-experiment quiz on the corresponding module. After the experiment, students need to submit the experiment report to the web server. Moreover, the module contains experiment process video recordings, which are very helpful to improve the effect of the experiment education. The management of the entire process of a student's graduation program, including the project selection, mid-term inspection, progress report of every two weeks, final thesis, et al, is completed by the graduation project management module. The teaching quality feedback module is not only helpful for teachers to know whether the education effect of curriculum is good or not, but also helpful for the administrators of the college to know whether the

  17. Engineering data management: Experience and projections

    NASA Technical Reports Server (NTRS)

    Jefferson, D. K.; Thomson, B.

    1978-01-01

    Experiences in developing a large engineering data management system are described. Problems which were encountered are presented and projected to future systems. Business applications involving similar types of data bases are described. A data base management system architecture proposed by the business community is described and its applicability to engineering data management is discussed. It is concluded that the most difficult problems faced in engineering and business data management can best be solved by cooperative efforts.

  18. IPMA Standard Competence Scope in Project Management Education

    ERIC Educational Resources Information Center

    Bartoška, Jan; Flégl, Martin; Jarkovská, Martina

    2012-01-01

    The authors of the paper endeavoured to find out key competences in IPMA standard for educational approaches in project management. These key competences may be used as a basis for project management university courses. An incidence matrix was set up, containing relations between IPMA competences described in IPMA competence baseline. Further,…

  19. Teaching Shakespeare.

    ERIC Educational Resources Information Center

    Davis, James E., Ed.

    1976-01-01

    This issue of "Focus: Teaching English in Southeastern Ohio" contains articles about teaching Shakespeare, student summaries of a Shakespeare conference held at Ohio University-Zanesville in April 1976, and suggested projects for teaching poetry writing. It also contains lists of materials and articles related to the teaching of…

  20. "Gender-into-Teaching" at the Vienna University of Technology. Experiences and Reflections on an Austrian Project

    ERIC Educational Resources Information Center

    Knoll, Bente; Ratzer, Brigitte

    2009-01-01

    "Gender-into-teaching" is the first Austrian project to develop strategies on how to implement gender topics at a technical university. This project can really be qualified as a model for other universities and as unique in Austria. Up to now, there are many more males in higher-level positions in the university hierarchies. The--very…

  1. Developments in Teaching Education Management. Study Conference 75/23A. Coombe Lodge Report Vol 8 No 10.

    ERIC Educational Resources Information Center

    Andrews, Philippa, Ed.

    This conference brought together a wide range of staff interested in the teaching of educational management. The contributing lecturers were chosen to highlight problems of management rather than of teaching. Lord Morris of Grasmere delineated the market need while J. M. Fearn outlined the Scottish system from the perspective of central…

  2. Managing the Challenges of Leadership in ERP Implementations: An Exploratory Study of the Leadership Challenges Encountered by Project Managers Involved in ERP Implementation Projects

    ERIC Educational Resources Information Center

    Wanjagi, James K.

    2013-01-01

    Increasingly, organizations are conducting more Enterprise Resource Planning (ERP) projects in order to promote organizational efficiencies. Meanwhile, minimal research has been conducted on the leadership challenges faced by project managers during the ERP project implementations and how these challenges are managed. The existing project…

  3. Project Management, Critical Praxis, and Process-Oriented Approach to Teamwork

    ERIC Educational Resources Information Center

    Ding, Huiling; Ding, Xin

    2008-01-01

    To help alleviate issues of free-riding and conflicts in team projects, this study proposes the systematic incorporation of project management methods to introduce a process-oriented approach to and a critical praxis in team projects. We examined how the systematic use of project management methods influenced students' performance in team…

  4. Managing Risk and Uncertainty in Large-Scale University Research Projects

    ERIC Educational Resources Information Center

    Moore, Sharlissa; Shangraw, R. F., Jr.

    2011-01-01

    Both publicly and privately funded research projects managed by universities are growing in size and scope. Complex, large-scale projects (over $50 million) pose new management challenges and risks for universities. This paper explores the relationship between project success and a variety of factors in large-scale university projects. First, we…

  5. Introducing a New Learning and Teaching Evaluation Planning Framework for Small Internally Funded Projects in Higher Education

    ERIC Educational Resources Information Center

    Huber, Elaine

    2017-01-01

    Scholarly evaluation practices in learning and teaching projects are under-reported in the literature. In order for robust evaluative measures to be implemented, a project requires a well-designed evaluation plan. This research study describes the development of a practical evaluation planning framework through an action research approach, using…

  6. The Woodworker's Website: A Project Management Case Study

    ERIC Educational Resources Information Center

    Jance, Marsha

    2014-01-01

    A case study that focuses on building a website for a woodworking business is discussed. Project management and linear programming techniques can be used to determine the time required to complete the website project discussed in the case. This case can be assigned to students in an undergraduate or graduate decision modeling or management science…

  7. Teaching the Teachers To Understand and Teach Indigenous Australian Studies: New Models, Teaching Strategies and Resources To Empower and Educate a Nation.

    ERIC Educational Resources Information Center

    Craven, Rhonda G.; Mooney, Janet

    This review presents a rationale for teaching Australian teachers to understand and teach Aboriginal Studies, describing the structure and development of the Teaching the Teachers: Indigenous Australian Studies Project of National Significance. The project was designed in response to a government recommendation that all teacher training programs…

  8. Using Literature to Teach Cross-Cultural Management: A German Perspective.

    ERIC Educational Resources Information Center

    Bloch, Brian

    1995-01-01

    Discusses the use of German literature in courses teaching cross-cultural management. The article argues that literature depicting society and culture promotes effective business interaction. It also attempts to clarify the benefits of using literary texts to supplement theoretical texts on international business. (26 references) (Author/CK)

  9. Campus Energy Management Projects.

    ERIC Educational Resources Information Center

    Welzenbach, Lanora, Ed.

    This publication is a compilation of data concerning energy conservation measures at more than 60 colleges and universities in the United States and Canada. The data are presented for the information of all who are interested in the variety of ways in which institutions of higher education are managing energy. Project descriptions are divided into…

  10. Appreciating the Complexity of Project Management Execution: Using Simulation in the Classroom

    ERIC Educational Resources Information Center

    Hartman, Nathan S.; Watts, Charles A.; Treleven, Mark D.

    2013-01-01

    As the popularity and importance of project management increase, so does the need for well-prepared project managers. This article discusses our experiences using a project management simulation in undergraduate and MBA classes to help students better grasp the complexity of project management. This approach gives students hands-on experience with…

  11. Communication Scaffolds for Project Management in PBL

    ERIC Educational Resources Information Center

    Sasaki, Shigeru; Arai, Masayuki; Takai, Kumiko; Ogawa, Mitsuhiro; Watanabe, Hiroyoshi

    2017-01-01

    In this study, the role-playing situation and the system requirement list are adopted into project-based learning classes to develop web applications. In the classes, the third-year undergraduate project managers communicate with the client of the project rolled by teachers on the Web bulletin board. These are expected to act as scaffolds to…

  12. Authentic Project-Based Design of Professional Development for Teachers Studying Online and Blended Teaching

    ERIC Educational Resources Information Center

    Dabner, Nicki; Davis, Niki; Zaka, Pinelopi

    2012-01-01

    Online learning and teaching is rapidly increasing in many countries, including high schools in the USA and teacher education worldwide. Online and blended approaches to professional and organizational development are, therefore, becoming essential to enable effective and equitable education. Authentic project-based learning to support the…

  13. Design and Development of a New Facility for Teaching and Research in Clinical Anatomy

    ERIC Educational Resources Information Center

    Greene, John Richard T.

    2009-01-01

    This article discusses factors in the design, commissioning, project management, and intellectual property protection of developments within a new clinical anatomy facility in the United Kingdom. The project was aimed at creating cost-effective facilities that would address widespread concerns over anatomy teaching, and support other activities…

  14. Disruption of Information Technology Projects: The Reactive Decoupling of Project Management Methodologies

    ERIC Educational Resources Information Center

    Schmitz, Kurt W.

    2013-01-01

    Information Technology projects have migrated toward two dominant Project Management (PM) methodologies. Plan-driven practices provide organizational control through highly structured plans, schedules, and specifications that facilitate oversight by hierarchical bureaucracies. In contrast, agile practices emphasize empowered teams using flexible…

  15. Functions and Relations: Some Applications from Database Management for the Teaching of Classroom Mathematics.

    ERIC Educational Resources Information Center

    Hauge, Sharon K.

    While functions and relations are important concepts in the teaching of mathematics, research suggests that many students lack an understanding and appreciation of these concepts. The present paper discusses an approach for teaching functions and relations that draws on the use of illustrations from database management. This approach has the…

  16. Improving Space Project Cost Estimating with Engineering Management Variables

    NASA Technical Reports Server (NTRS)

    Hamaker, Joseph W.; Roth, Axel (Technical Monitor)

    2001-01-01

    Current space project cost models attempt to predict space flight project cost via regression equations, which relate the cost of projects to technical performance metrics (e.g. weight, thrust, power, pointing accuracy, etc.). This paper examines the introduction of engineering management parameters to the set of explanatory variables. A number of specific engineering management variables are considered and exploratory regression analysis is performed to determine if there is statistical evidence for cost effects apart from technical aspects of the projects. It is concluded that there are other non-technical effects at work and that further research is warranted to determine if it can be shown that these cost effects are definitely related to engineering management.

  17. Online Tutoring Procedure for Research Project Supervision: Management, Organization and Key Elements

    ERIC Educational Resources Information Center

    Darder Mesquida, Antònia; Pérez Garcias, Adolfina

    2015-01-01

    Research project tutoring appears as a crucial element for teaching; it is a planned action based on the relationship between a tutor and a student. This paper presents the findings of a design and development research which has as its main aim to create an organization system for the tutoring of online research projects. That system seeks to…

  18. Project-oriented teaching model about specialized courses in the information age

    NASA Astrophysics Data System (ADS)

    Chen, Xiaodong; Wang, Jinjiang; Tian, Qingguo; Wang, Yi; Cai, Huaiyu

    2017-08-01

    Specialized courses play a significant role in the usage of basic knowledge in the practical application for engineering college students. The engineering data available has sharply increased since the beginning of the information age in the 20th century, providing much more approaches to study and practice. Therefore, how to guide students to make full use of resources for active engineering practice learning has become one of the key problems for specialized courses. This paper took the digital image processing course for opto-electronic information science and technology major as an example, discussed the teaching model of specialized course in the information age, put forward the "engineering resource oriented model", and fostered the ability of engineering students to use the basic knowledge to innovate and deal with specific project objectives. The fusion of engineering examples into practical training and teaching encourages students to practice independent engineering thinking.

  19. Business Organization and Management Syllabus.

    ERIC Educational Resources Information Center

    Wing, Ronald W.; Rubin, Alvin E.

    A large proportion of American men and women are in occupations which involve business management. The syllabus gives the classroom teacher and school administrator a complete course outline with correlated teaching suggestions in addition to suggested projects and sources for a management library. Chapters 1, 2, and 3 offer general information…

  20. 76 FR 69700 - Klamath National Forest; California; Pumice Vegetation Management Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-09

    ... Management Project AGENCY: Forest Service, USDA. ACTION: Notice of intent to prepare an environmental impact.... Grantham, Forest Supervisor, Attn: Ben Haupt, Pumice Vegetation Management Project Team Leader, Goosenest... Management Project will recommend implementation of one of the following: (1) The proposed action; (2) an...

  1. Putting the Q into Quality Project Management

    ERIC Educational Resources Information Center

    Lockitt, Bill

    2007-01-01

    Project management covers a wide range of skills and is one of the best forms of staff development available for the development of skills by doing. This publication is for the use of staff involved in e-learning development projects. An introduction and overview includes discussion of e-learning projects in general and why they are undertaken;…

  2. The Utilization of Project Management in the Pharmaceutical Industry.

    ERIC Educational Resources Information Center

    Krusko, Diane; Cangemi, Robert R.

    1987-01-01

    A survey of 99 pharmaceutical companies concerning their organization and use of project management techniques for research and development found that the industry is using project management increasingly in a variety of ways for better business planning and operations. (MSE)

  3. Developing a User-Centred Planning Tool for Young Adults with Development Disorders: A Research-Based Teaching Project.

    PubMed

    Ribu, Kirsten; Patel, Tulpesh

    2016-01-01

    People with development disorders, for instance autism, need structured plans to help create predictability in their daily lives. Digital plans can facilitate enhanced independency, learning, and quality of life, but existing apps are largely general purpose and lack the flexibility required by this specific but heterogeneous user group. Universal design is both a goal and a process and should be based on a holistic approach and user-centered design, interacting with the users in all stages of the development process. At Oslo and Akershus University College (HiOA) we conducted a research-based teaching project in co-operation with the Department of Neuro-habilitation at Oslo University Hospital (OUS) with two employees acting as project managers and students as developers. Three groups of Computer Science bachelor students developed digital prototypes for a planning tool for young adults with pervasive development disorders, who live either with their families or in supervised residences, and do not receive extensive public services. The students conducted the initial planning phase of the software development process, focusing on prototyping the system requirements, whilst a professional software company programmed the end solution. The goal of the project was to develop flexible and adaptive user-oriented and user-specific app solutions for tablets that can aid this diverse user group in structuring daily life, whereby, for example, photos of objects and places known to the individual user replace general pictures or drawings, and checklists can be elaborate or sparse as necessary. The three student groups worked independently of each other and created interactive working prototypes based on tests, observations and short interviews with end users (both administrators and residents) and regular user feedback from the project managers. Three very different solutions were developed that were of high enough quality that an external software company were able to

  4. Ecology, Ecosystem Management and Biology Teaching. Biology and Human Welfare.

    ERIC Educational Resources Information Center

    Spellerberg, Ian F.; Pritchard, Alan J.

    This six-chapter document (part of a series on biology and human welfare) focuses on ecology, ecosystem management, and biology teaching. Chapter 1 discusses the basic elements of ecology (considering organisms and their environment, populations, and communities and ecosystems). Chapter 2 describes several aspects of human ecology and resources…

  5. Teaching Database Management System Use in a Library School Curriculum.

    ERIC Educational Resources Information Center

    Cooper, Michael D.

    1985-01-01

    Description of database management systems course being taught to students at School of Library and Information Studies, University of California, Berkeley, notes course structure, assignments, and course evaluation. Approaches to teaching concepts of three types of database systems are discussed and systems used by students in the course are…

  6. A Writing-Intensive Program for Teaching Retail Management.

    ERIC Educational Resources Information Center

    Darian, Jean C.; And Others

    1992-01-01

    Presents the writing-intensive design for a retailing management course developed by its instructor in accordance with writing-across-the-curriculum principles. Provides an overview of the semester-long project. Details project procedures for preparatory activities, field research, and writing the marketing plan. (SR)

  7. Hospital management principles applicable to the veterinary teaching hospital.

    PubMed

    Harris, Donna L; Lloyd, James W; Marrinan, Mike

    2004-01-01

    The Skills, Knowledge, Aptitude, and Attitude (SKA) Subcommittee of the National Commission on Veterinary Economic Issues (NCVEI) has identified the need for veterinary teaching hospitals (VTH) to be at the forefront of progressive business management to serve as a model for both students and practitioners to emulate. To provide a foundation for developing a model, this study reviewed pertinent literature applicable to the management of a VTH. Much of the literature relevant to VTH management relates to work completed for the human side of medicine (academic health centers, or AHCs) or to the private sector. This review explores management practices in strategic planning, financial management, human resource management, marketing, pricing, operations, and legal issues. It is concluded that strategic management is important to provide the foundation for success in the VTH. In addition, periodic financial reports are recommended, as are the development and use of benchmarks for financial management. Establishing positive, motivating human resource practices is also suggested, along with development of a marketing plan based on a clear understanding of VTH core competencies and the market's specific needs.

  8. Integrating Agronomic Principles with Management Experience in Introductory Agronomy.

    ERIC Educational Resources Information Center

    Vorst, J. J.

    1989-01-01

    Explains the use of a cropping systems project to teach agronomic principles and crop management techniques, and to enhance communication skills. Provides a sample progress report instructions sheet which was used for the project. (Author/RT)

  9. Does Teacher Evaluation Improve School Performance? Experimental Evidence from Chicago's Excellence in Teaching Project

    ERIC Educational Resources Information Center

    Steinberg, Matthew P.; Sartain, Lauren

    2015-01-01

    Chicago Public Schools initiated the Excellence in Teaching Project, a teacher evaluation program designed to increase student learning by improving classroom instruction through structured principal-teacher dialogue. The pilot began in forty-four elementary schools in 2008-09 (cohort 1) and scaled up to include an additional forty-eight…

  10. Annotated Bibliography of Computer Software for Teaching Early Reading and Spelling. Project RIMES 2000.

    ERIC Educational Resources Information Center

    Rhein, Deborah; Alibrandi, Mary; Lyons, Mary; Sammons, Janice; Doyle, Luther

    This bibliography, developed by Project RIMES (Reading Instructional Methods of Efficacy with Students) lists 80 software packages for teaching early reading and spelling to students at risk for reading and spelling failure. The software packages are presented alphabetically by title. Entries usually include a grade level indicator, a brief…

  11. Using Simulation Technology to Teach Diabetes Care Management Skills to Resident Physicians

    PubMed Central

    Sperl-Hillen, John; O’Connor, Patrick; Ekstrom, Heidi; Rush, William; Asche, Stephen; Fernandes, Omar; Appana, Deepika; Amundson, Gerald; Johnson, Paul

    2013-01-01

    Background Simulation is widely used to teach medical procedures. Our goal was to develop and implement an innovative virtual model to teach resident physicians the cognitive skills of type 1 and type 2 diabetes management. Methods A diabetes educational activity was developed consisting of (a) a curriculum using 18 explicit virtual cases, (b) a web-based interactive interface, (c) a simulation model to calculate physiologic outcomes of resident actions, and (d) a library of programmed feedback to critique and guide resident actions between virtual encounters. Primary care residents in 10 U.S. residency programs received the educational activity. Satisfaction and changes in knowledge and confidence in managing diabetes were analyzed with mixed quantitative and qualitative methods. Results Pre- and post-education surveys were completed by 92/142 (65%) of residents. Likert scale (five-point) responses were favorably higher than neutral for general satisfaction (94%), recommending to colleagues (91%), training adequacy (91%), and navigation ease (92%). Finding time to complete cases was difficult for 50% of residents. Mean ratings of knowledge (on a five-point scale) posteducational activity improved by +0.5 (p < .01) for use of all available drug classes, +0.9 (p < .01) for how to start and adjust insulin, +0.8 (p < .01) for interpreting blood glucose values, +0.8 (p < .01) for individualizing treatment goals, and +0.7 (p < .01) for confidence in managing diabetes patients. Conclusions A virtual diabetes educational activity to teach cognitive skills to manage diabetes to primary care residents was successfully developed, implemented, and well liked. It significantly improved self-assessed knowledge and confidence in diabetes management. PMID:24124951

  12. Science operations management. [with Infrared Astronomy Satellite project

    NASA Technical Reports Server (NTRS)

    Squibb, G. F.

    1984-01-01

    The operation teams engaged in the IR Astronomical Satellite (IRAS) project included scientists from the IRAS International Science Team. The detailed involvement of these scientists in the design, testing, validation, and operations phases of the IRAS mission contributed to the success of this project. The Project Management Group spent a substantial amount of time discussing science-related issues, because science team coleaders were members from the outset. A single scientific point-of-contact for the Management Group enhanced the depth and continuity of agreement reached in decision-making.

  13. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...

  14. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 4 2013-01-01 2013-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...

  15. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 4 2014-01-01 2014-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...

  16. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 4 2011-01-01 2011-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...

  17. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 4 2012-01-01 2012-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...

  18. Support for Maintaining Independence in the Elderly--Future Requirements and Solutions: Florida's TEACH Demonstration Project--Home-Based, Case Management Services to the Medically Dependent Elderly and Their Caregivers--What We Hope To Learn.

    ERIC Educational Resources Information Center

    Bradham, Douglas D.; And Others

    This document describes the TEACH (Train the Elderly And their Caregivers at Home) project, a demonstration project developed by Florida's District 12 Veterans Administration and the Florida Department of Health and Rehabilitative Services to reduce Medicaid nursing home expenditures by delaying or avoiding nursing home placement and to provide…

  19. STUDENT TEACHING CENTER PROJECT. FINAL REPORT.

    ERIC Educational Resources Information Center

    FISCHER, STEPHEN J.; GODDU, ROLAND J.B.

    STUDENT TEACHING CENTERS WERE ESTABLISHED TO MORE EFFECTIVELY CONDUCT STUDENT TEACHER PROGRAMS THROUGH AN INCREASED EMPHASIS ON THE ROLE OF SUPERVISION. A STUDENT TEACHING CENTER IS AN ADMINISTRATIVE ARRANGEMENT WHERE THE SCHOOL AND UNIVERSITY JOINTLY PAY THE SALARY OF A MASTER TEACHER, CALLED A RESIDENT SUPERVISOR, WHO IS GIVEN RELEASED TIME FOR…

  20. Project risk management in the construction of high-rise buildings

    NASA Astrophysics Data System (ADS)

    Titarenko, Boris; Hasnaoui, Amir; Titarenko, Roman; Buzuk, Liliya

    2018-03-01

    This paper shows the project risk management methods, which allow to better identify risks in the construction of high-rise buildings and to manage them throughout the life cycle of the project. One of the project risk management processes is a quantitative analysis of risks. The quantitative analysis usually includes the assessment of the potential impact of project risks and their probabilities. This paper shows the most popular methods of risk probability assessment and tries to indicate the advantages of the robust approach over the traditional methods. Within the framework of the project risk management model a robust approach of P. Huber is applied and expanded for the tasks of regression analysis of project data. The suggested algorithms used to assess the parameters in statistical models allow to obtain reliable estimates. A review of the theoretical problems of the development of robust models built on the methodology of the minimax estimates was done and the algorithm for the situation of asymmetric "contamination" was developed.

  1. International Project Management Committee: Overview and Activities

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward

    2010-01-01

    This slide presentation discusses the purpose and composition of the International Project Management Committee (IMPC). The IMPC was established by members of 15 space agencies, companies and professional organizations. The goal of the committee is to establish a means to share experiences and best practices with space project/program management practitioners at the global level. The space agencies that are involved are: AEB, DLR, ESA, ISRO, JAXA, KARI, and NASA. The industrial and professional organizational members are Comau, COSPAR, PMI, and Thales Alenia Space.

  2. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1989-01-01

    This new collection of papers on aerospace management issues contains a history of NASA program and project management, some lessons learned in the areas of management and budget from the Space Shuttle Program, an analysis of tools needed to keep large multilayer programs organized and on track, and an update of resources for NASA managers. A wide variety of opinions and techniques are presented.

  3. The Marketing Plan: An Integrative Device for Teaching Marketing Management.

    ERIC Educational Resources Information Center

    Berdine, W. R.; Petersen, James C.

    1980-01-01

    The importance of the marketing plan is stressed as an integrative device for teaching marketing management, and a structure is presented to assist students in designing a marketing plan. Components of this plan include marketing objectives, targeting market and buying motives, external environment and competition, product, price, and promotion.…

  4. Using Powerpoint Animations to Teach Operations Management Techniques and Concepts

    ERIC Educational Resources Information Center

    Treleven, Mark D.; Penlesky, Richard J.; Callarman, Thomas E.; Watts, Charles A.; Bragg, Daniel J.

    2014-01-01

    This article examines the value of using complex animated PowerPoint presentations to teach operations management techniques and concepts. To provide context, literature covering the use of PowerPoint animations in business education is briefly reviewed. The specific animations employed in this study are identified and their expected benefits to…

  5. Teaching Intercultural Management Communication: Where Are We? Where Do We Go?

    ERIC Educational Resources Information Center

    Varner, Iris I.

    2001-01-01

    Outlines three major challenges faced in teaching intercultural business communication, and discusses how teachers can meet these challenges to assure that students become effective intercultural managers and communicators. Outlines several specific activities to improve students' intercultural business communication skills. (SR)

  6. Teaching Principles of Management through Experiential and Service Learning

    ERIC Educational Resources Information Center

    Furutan, Omid

    2014-01-01

    Management faculties often use cases, simulations, and research projects to achieve learning objectives in the Principles of Management class. This class typically aims to introduce students to the topics of "planning, organizing, coordinating, staffing, directing, budgeting, controlling, and evaluating functions of management; leadership…

  7. Continuous Risk Management at NASA

    NASA Technical Reports Server (NTRS)

    Hammer, Theodore F.; Rosenberg, Linda

    1999-01-01

    NPG 7120.5A, "NASA Program and Project Management Processes and Requirements" enacted in April, 1998, requires that "The program or project manager shall apply risk management principles..." The Software Assurance Technology Center (SATC) at NASA GSFC has been tasked with the responsibility for developing and teaching a systems level course for risk management that provides information on how to comply with this edict. The course was developed in conjunction with the Software Engineering Institute at Carnegie Mellon University, then tailored to the NASA systems community. This presentation will briefly discuss the six functions for risk management: (1) Identify the risks in a specific format; (2) Analyze the risk probability, impact/severity, and timeframe; (3) Plan the approach; (4) Track the risk through data compilation and analysis; (5) Control and monitor the risk; (6) Communicate and document the process and decisions. This risk management structure of functions has been taught to projects at all NASA Centers and is being successfully implemented on many projects. This presentation will give project managers the information they need to understand if risk management is to be effectively implemented on their projects at a cost they can afford.

  8. Some Correlates of Electronic Health Information Management System Success in Nigerian Teaching Hospitals

    PubMed Central

    Ojo, Adebowale I; Popoola, Sunday O

    2015-01-01

    Nowadays, an electronic health information management system (EHIMS) is crucial for patient care in hospitals. This paper explores the aspects and elements that contribute to the success of EHIMS in Nigerian teaching hospitals. The study adopted a survey research design. The population of study comprised 442 health information management personnel in five teaching hospitals that had implemented EHIMS in Nigeria. A self-developed questionnaire was used as an instrument for data collection. The findings revealed that there is a positive, close relationship between all the identified factors and EHIMS’s success: technical factors (r = 0.564, P < 0.05); social factors (r = 0.616, P < 0.05); organizational factors (r = 0.621, P < 0.05); financial factors (r = 0.705, P < 0.05); and political factors (r = 0.589, P < 0.05). We conclude that consideration of all the identified factors was highly significant for the success of EHIMS in Nigerian teaching hospitals. PMID:25983557

  9. Some correlates of electronic health information management system success in nigerian teaching hospitals.

    PubMed

    Ojo, Adebowale I; Popoola, Sunday O

    2015-01-01

    Nowadays, an electronic health information management system (EHIMS) is crucial for patient care in hospitals. This paper explores the aspects and elements that contribute to the success of EHIMS in Nigerian teaching hospitals. The study adopted a survey research design. The population of study comprised 442 health information management personnel in five teaching hospitals that had implemented EHIMS in Nigeria. A self-developed questionnaire was used as an instrument for data collection. The findings revealed that there is a positive, close relationship between all the identified factors and EHIMS's success: technical factors (r = 0.564, P < 0.05); social factors (r = 0.616, P < 0.05); organizational factors (r = 0.621, P < 0.05); financial factors (r = 0.705, P < 0.05); and political factors (r = 0.589, P < 0.05). We conclude that consideration of all the identified factors was highly significant for the success of EHIMS in Nigerian teaching hospitals.

  10. Preparing project managers for faster-better-cheaper robotic planetary missions

    NASA Technical Reports Server (NTRS)

    Gowler, P.; Atkins, K.

    2003-01-01

    The authors have developed and implemented a week-long workshop for Jet Propulsion Laboratory Project Managers, designed around the development phases of the JPL Project Life Cycle. The workshop emphasizes the specific activities and deliverables that pertain to JPL managers of NASA robotic space exploration and instrument development projects.

  11. Adapting to Teach Climate Literacy

    NASA Astrophysics Data System (ADS)

    Wilkening, B.; Schwartz, K. L.

    2017-12-01

    Adaptation is a key strategy to deal with the effects of climate change, and it can also be a key strategy in teaching climate literacy. Adapting curriculum to include utilizing new instructional practices, modifying existing lessons, evaluating evidence and engaging students in real-world projects are strategies employed in Recharge the Rain. Arizona Project WET and Watershed Management Group developed the Recharge the Rain project, through a NOAA Environmental Literacy Grant, to build community resiliency to hazards associated with increased temperatures, drought and flooding in Arizona. Sixth through twelfth grade teachers, students and the public will move through a continuum from awareness, to knowledge gain, to conceptual understanding, to action. During the first year of the project, through professional development and ongoing guidance, teachers developed a climate literacy curriculum to use in their classrooms. Using systems thinking language and structure from the Cabrera Research Labs, teachers and students gain the thinking tools necessary to increase understanding of Earth's climate system. Lessons and resources for teaching about climate change are abundant and many, such as those on the Climate Literacy Education Awareness Network (CLEAN), have gone through an extensive review process. By cataloguing online resources and sharing these with teachers through a social bookmarking tool, wakelet.com, teachers are easily able to find appropriate teaching material. Engaging students in evaluating evidence requires the data to be relevant to their everyday lives. Online data resources are readily available from NOAA and other sources at both the global and local levels. When teachers, students and the public contribute to the data collection process in citizen science projects such as CoCoRaHS, iSeeChange, and USA National Phenology Network, the data empowers them to act in ways to mitigate the climate threats in their community. Adapting to teach climate

  12. A Conceptual Model and Database to Integrate Data and Project Management

    NASA Astrophysics Data System (ADS)

    Guarinello, M. L.; Edsall, R.; Helbling, J.; Evaldt, E.; Glenn, N. F.; Delparte, D.; Sheneman, L.; Schumaker, R.

    2015-12-01

    Data management is critically foundational to doing effective science in our data-intensive research era and done well can enhance collaboration, increase the value of research data, and support requirements by funding agencies to make scientific data and other research products available through publically accessible online repositories. However, there are few examples (but see the Long-term Ecological Research Network Data Portal) of these data being provided in such a manner that allows exploration within the context of the research process - what specific research questions do these data seek to answer? what data were used to answer these questions? what data would have been helpful to answer these questions but were not available? We propose an agile conceptual model and database design, as well as example results, that integrate data management with project management not only to maximize the value of research data products but to enhance collaboration during the project and the process of project management itself. In our project, which we call 'Data Map,' we used agile principles by adopting a user-focused approach and by designing our database to be simple, responsive, and expandable. We initially designed Data Map for the Idaho EPSCoR project "Managing Idaho's Landscapes for Ecosystem Services (MILES)" (see https://www.idahoecosystems.org//) and will present example results for this work. We consulted with our primary users- project managers, data managers, and researchers to design the Data Map. Results will be useful to project managers and to funding agencies reviewing progress because they will readily provide answers to the questions "For which research projects/questions are data available and/or being generated by MILES researchers?" and "Which research projects/questions are associated with each of the 3 primary questions from the MILES proposal?" To be responsive to the needs of the project, we chose to streamline our design for the prototype

  13. Day-to-day management of EU projects: Implementation of a local manager network to secure knowledge transfer

    NASA Astrophysics Data System (ADS)

    Hoffmann, Friederike; Meyer, Stefanie; de Vareilles, Mahaut

    2017-04-01

    In the past years there has been a strong push in Norway for increasing participation in the EU Framework Programmes for Research and Innovation. EU projects coordinated by the University of Bergen (UiB) usually receive management support from the central administration (mostly financial) in collaboration with a full- or part-time scientific project manager working on a fixed-term contract at the same institute as the project's principal scientist. With an increasing amount of granted EU projects, the number of scientific project managers employed across the whole university has also increased, and a need for coordination and professionalization of this service became obvious. Until recently, UiB had no unified structures and routines for training of newly recruited project managers, or for archiving and transferring routines and skills after the end of the project and the manager's employment contract. To overcome this administrative knowledge gap, the "Forum for scientific EU project managers at UiB" was founded in spring 2016 as an informal communication platform. Its purpose is to bring together current and previous scientific EU project managers from different disciplines to share their experiences. The main aim of the forum is to transfer and improve knowledge, skills and routines on effective management of EU funded projects, but also to function as a discussion forum where issues arising from handling international consortia can be reviewed. The group meets monthly and discusses current challenges from on-going EU projects as well as routines for specific project operation tasks. These routines are archived in an online best-practise guide which the group currently develops. The regular personal meetings are supplemented with an intense communication via a group mailing list and several individual mail- and phone-meetings. Since lessons learned during project implementation may improve future proposals, UiB research advisors for proposal support frequently

  14. Linking Theory with Practice: Undergraduate Project Management with School-Age Children.

    ERIC Educational Resources Information Center

    Falkenberg, Loren; Russell, Randy; Ricker, Lynne

    2000-01-01

    Management students taught basic business concepts to sixth graders and managed business projects with them. The management students applied knowledge of marketing, human resources, and operations management and developed reflective learning skills through project reports and coaching sessions. (SK)

  15. Teaching the Way We Aspire to Teach: Now and in the Future. Teachers' Vision for Teaching and Learning in Canada's Public Schools

    ERIC Educational Resources Information Center

    Freiler, Christa; Hurley, Stephen; Canuel, Ron; McGahey, Bob; Froese-Germain, Bernie; Riel, Rick

    2012-01-01

    "Teaching the Way We Aspire to Teach--Now and in the Future" is a collaborative research project between the Canadian Education Association (CEA) and the Canadian Teachers' Federation (CTF). The project grew out of a shared interest in exploring with teachers their experiences and visions of teaching the way in which they aspire--that…

  16. New Teaching Techniques.

    ERIC Educational Resources Information Center

    Health Education (Washington D.C.), 1985

    1985-01-01

    Health educators have consistently shown creativity in using innovative teaching techniques. Three articles from the past discuss "new" teaching methods: (1) "A Radio Project Teaches Your Class" (Miller); (2) "An Activity Program in Alcohol Education" (Breg); and (3) "Teaching Health Through Pictures" (Haviland). (CB)

  17. Issues in NASA program and project management. Special Report: 1993 conference

    NASA Technical Reports Server (NTRS)

    Hoffman, ED (Editor); Kishiyama, Jenny S. (Editor)

    1993-01-01

    This volume is the seventh in an ongoing series on aerospace project management at NASA. Articles in this volume cover the 1993 Conference: perspectives in NASA program/project management; the best job in aerospace; improvements in project management at NASA; strategic planning...mapping the way to NASA's future; new NASA procurement initiatives; international cooperation; and industry, government and university partnership. A section on resources for NASA managers rounds out the publication.

  18. Project Management Professional Development: An Industry Led Programme.

    ERIC Educational Resources Information Center

    Gale, Andrew; Brown, Mike

    2003-01-01

    Describes a modular master's program in project management. Explores relationships between return on investment, management competencies, and learning outcomes in the context of industry-academic partnerships. Discusses the managed learning environment using WebCT. (Contains 40 references.) (SK)

  19. 7 CFR 1948.78 - Growth management and housing planning projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 13 2010-01-01 2009-01-01 true Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of this...

  20. 7 CFR 1948.78 - Growth management and housing planning projects.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 13 2013-01-01 2013-01-01 false Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of this...

  1. 7 CFR 1948.78 - Growth management and housing planning projects.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 13 2012-01-01 2012-01-01 false Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of this...

  2. 7 CFR 1948.78 - Growth management and housing planning projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 13 2011-01-01 2009-01-01 true Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of this...

  3. 7 CFR 1948.78 - Growth management and housing planning projects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 13 2014-01-01 2013-01-01 true Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of this...

  4. Health Project Management. A Manual of Procedures for Formulating and Implementing Health Projects.

    ERIC Educational Resources Information Center

    Bainbridge, J.; Sapirie, S.

    The manual presents 16 main steps for health project management, from project formulation through termination. The manual defines a health project as a temporary intensive effort to set up and put into operation a new or revised service that will result in the reduction of specific health or health-related problems. (Typical examples include the…

  5. NREL: U.S. Life Cycle Inventory Database - Project Management Team

    Science.gov Websites

    Project Management Team Information about the U.S. Life Cycle Inventory (LCI) Database project management team is listed on this page. Additional project information is available about the U.S. LCI Mechanical Engineering, Colorado State University Professional History Michael has worked as a Senior

  6. Improvement of Project Portfolio Management in an Information Technology Consulting Company

    NASA Astrophysics Data System (ADS)

    Kaewta, S.; Chutima, P.

    2014-06-01

    The scope of this research is to improve the efficiency of multiple project management in an information technology consulting company through the adaptation of the project portfolio management technique. The project management information system (PMIS) is implemented to establish effective communication channels so that internal and external teams as well as all relevant stakeholders can be employed to negotiate their work schedules. In addition, all activities created by multiple teams can be systematically reviewed and combined into a single checklist to be used as an agreed working plan for all team members. A general guideline for project portfolio management in information technology consulting companies is also proposed, which could results in a higher level of project on-time delivery.

  7. Derived crop management data for the LandCarbon Project

    USGS Publications Warehouse

    Schmidt, Gail; Liu, Shu-Guang; Oeding, Jennifer

    2011-01-01

    The LandCarbon project is assessing potential carbon pools and greenhouse gas fluxes under various scenarios and land management regimes to provide information to support the formulation of policies governing climate change mitigation, adaptation and land management strategies. The project is unique in that spatially explicit maps of annual land cover and land-use change are created at the 250-meter pixel resolution. The project uses vast amounts of data as input to the models, including satellite, climate, land cover, soil, and land management data. Management data have been obtained from the U.S. Department of Agriculture (USDA) National Agricultural Statistics Service (NASS) and USDA Economic Research Service (ERS) that provides information regarding crop type, crop harvesting, manure, fertilizer, tillage, and cover crop (U.S. Department of Agriculture, 2011a, b, c). The LandCarbon team queried the USDA databases to pull historic crop-related management data relative to the needs of the project. The data obtained was in table form with the County or State Federal Information Processing Standard (FIPS) and the year as the primary and secondary keys. Future projections were generated for the A1B, A2, B1, and B2 Intergovernmental Panel on Climate Change (IPCC) Special Report on Emissions Scenarios (SRES) scenarios using the historic data values along with coefficients generated by the project. The PBL Netherlands Environmental Assessment Agency (PBL) Integrated Model to Assess the Global Environment (IMAGE) modeling framework (Integrated Model to Assess the Global Environment, 2006) was used to develop coefficients for each IPCC SRES scenario, which were applied to the historic management data to produce future land management practice projections. The LandCarbon project developed algorithms for deriving gridded data, using these tabular management data products as input. The derived gridded crop type, crop harvesting, manure, fertilizer, tillage, and cover crop

  8. Learning in Introductory E-Commerce: A Project-Based Teamwork Approach

    ERIC Educational Resources Information Center

    Ngai, Eric W. T.

    2007-01-01

    In this paper, we describe an e-commerce teamwork-based project designed and implemented at the Hong Kong Polytechnic University (PolyU) for undergraduate business and management students. The teaching objectives of this e-commerce project are to develop the students' knowledge and skills, such as in the use of e-commerce site building tools,…

  9. Power Teaching

    ERIC Educational Resources Information Center

    Fluellen, Jerry E., Jr.

    2007-01-01

    Power Teaching weaves four factors into a seamless whole: standards, teaching thinking, research based strategies, and critical inquiry. As a prototype in its first year of development with an urban fifth grade class, the power teaching model connects selected district standards, thinking routines from Harvard University Project Zero Research…

  10. Building a Propulsion Experiment Project Management Environment

    NASA Technical Reports Server (NTRS)

    Keiser, Ken; Tanner, Steve; Hatcher, Danny; Graves, Sara

    2004-01-01

    What do you get when you cross rocket scientists with computer geeks? It is an interactive, distributed computing web of tools and services providing a more productive environment for propulsion research and development. The Rocket Engine Advancement Program 2 (REAP2) project involves researchers at several institutions collaborating on propulsion experiments and modeling. In an effort to facilitate these collaborations among researchers at different locations and with different specializations, researchers at the Information Technology and Systems Center,' University of Alabama in Huntsville, are creating a prototype web-based interactive information system in support of propulsion research. This system, to be based on experience gained in creating similar systems for NASA Earth science field experiment campaigns such as the Convection and Moisture Experiments (CAMEX), will assist in the planning and analysis of model and experiment results across REAP2 participants. The initial version of the Propulsion Experiment Project Management Environment (PExPM) consists of a controlled-access web portal facilitating the drafting and sharing of working documents and publications. Interactive tools for building and searching an annotated bibliography of publications related to REAP2 research topics have been created to help organize and maintain the results of literature searches. Also work is underway, with some initial prototypes in place, for interactive project management tools allowing project managers to schedule experiment activities, track status and report on results. This paper describes current successes, plans, and expected challenges for this project.

  11. NASA's Cryogenic Fluid Management Technology Project

    NASA Technical Reports Server (NTRS)

    Tramel, Terri L.; Motil, Susan M.

    2008-01-01

    The Cryogenic Fluid Management (CFM) Project's primary objective is to develop storage, transfer, and handling technologies for cryogens that will support the enabling of high performance cryogenic propulsion systems, lunar surface systems and economical ground operations. Such technologies can significantly reduce propellant launch mass and required on-orbit margins, reduce or even eliminate propellant tank fluid boil-off losses for long term missions, and simplify vehicle operations. This paper will present the status of the specific technologies that the CFM Project is developing. The two main areas of concentration are analysis models development and CFM hardware development. The project develops analysis tools and models based on thermodynamics, hydrodynamics, and existing flight/test data. These tools assist in the development of pressure/thermal control devices (such as the Thermodynamic Vent System (TVS), and Multi-layer insulation); with the ultimate goal being to develop a mature set of tools and models that can characterize the performance of the pressure/thermal control devices incorporated in the design of an entire CFM system with minimal cryogen loss. The project does hardware development and testing to verify our understanding of the physical principles involved, and to validate the performance of CFM components, subsystems and systems. This database provides information to anchor our analytical models. This paper describes some of the current activities of the NASA's Cryogenic Fluid Management Project.

  12. Project-based teaching in health informatics: a course on health care quality improvement.

    PubMed

    Moehr, J R; Berenji, G R; Green, C J; Kagolovsky, Y

    2001-01-01

    Teaching the skills and knowledge required in health informatics [1] is a challenge because the skill of applying knowledge in real life requires practice. We relate the experience with introducing a practice component to a course in "Health Care Quality Improvement". Working health care professionals were invited to bring an actual quality problem from their place of work and to work alongside students in running the problem through a quality improvement project lifecycle. Multiple technological and process oriented teaching innovations were employed including project sessions in observation rooms, video recording of these sessions, generation of demonstration examples and distance education components. Both students and their collaborators from the work place developed proficiency in applying quality improvement methods as well as in experiencing the realities of group processes, information gaps and organizational constraints. The principles used to achieve high involvement of the whole class, the employed resources and technical support are described. The resulting academic and practical achievements are discussed in relation to the alternative instructional modalities, and with respect to didactic implications for similar endeavors and beyond to other fields such as systems engineering.

  13. You Can't Teach a Class You Can't Manage

    ERIC Educational Resources Information Center

    Whyte, Donna

    2008-01-01

    Donna Whyte presents specific strategies for addressing classroom management problems, and she doesn't shy away from tough issues such as bullying, lying, and stealing. Her focus is on an even greater challenge, teaching children the skills they need to control their own behavior. Whyte offers humor, perspective, and insight as she shares her own…

  14. Can Distance Learning Be Used to Teach Automotive Management Skills?

    ERIC Educational Resources Information Center

    Noto, Teresa L.

    2011-01-01

    Today's automotive college students will shape the future of the automobile industry. The success of college-level automotive programs has long been dependent on the students' ability to participate in hands-on classroom based interactions. In this article, distance learning and how it can be used to teach automotive management skills, as well as…

  15. Creating a Project-Based Learning Environment to Improve Project Management Skills of Graduate Students

    ERIC Educational Resources Information Center

    Arantes do Amaral, Joao Alberto; Gonçalves, Paulo; Hess, Aurélio

    2015-01-01

    This article describes the project-based learning environment created to support project management graduate courses. The paper will focus on the learning context and procedures followed for 13 years, in 47 project-based learning MBA courses, involving approximately 1,400 students and 34 community partners.

  16. Enhancing the strategic management of practice learning through the introduction of the role of Learning Environment Manager.

    PubMed

    Congdon, Graham; Baker, Tracey; Cheesman, Amanda

    2013-03-01

    This paper describes a process evaluation project designed to enhance the strategic management of practice learning within a large Hospital in the North of England. The aim of the project was to introduce the role of the Learning Environment Manager with dedicated responsibility for practice learning of undergraduate student nurses within the Hospital's 49 practice-settings. Whilst aspects of this role were already evident in several of these settings, the project sought to locate and standardise responsibilities related to the organisation and management of learning and teaching in practice explicitly within the existing staffing structure of each practice-setting. Focus group interviews were used to explore significant aspects of the project with key stakeholder groups comprising Learning Environment Managers, the Hospital Clinical Educator, Hospital Department Managers, Ward Managers, Mentors, University Link Lecturers and undergraduate Student Nurses. Interview data were analysed using thematic content analysis. The findings of the project suggest that the Learning Environment Manager role affords providers of practice learning with a robust approach to establish organisation-wide benchmarks that standardise the strategic management of practice learning in collaboration with partner Universities. The role incorporated many operational activities previously undertaken by the Hospital Clinical Educator, thus enabling the Hospital Clinical Educator to make a more strategic contribution to the on-going quality monitoring and enhancement of practice learning across the Hospital. The Learning Environment Manager role was found to provide mentors with high levels of support which in turn helped to promote consistent, positive and holistic practice learning experiences for undergraduate student nurses across the Hospital. Importantly, the role offers a potent catalyst for nurses in practice to regain responsibility for practice learning and re-establish the value of

  17. A transportation-scheduling system for managing silvicultural projects

    Treesearch

    Jorge F. Valenzuela; H. Hakan Balci; Timothy McDonald

    2005-01-01

    A silvicultural project encompasses tasks such as sitelevel planning, regeneration, harvestin, and stand-tending treatments. an essential problem in managing silvicultural projects is to efficiently schedule the operations while considering project task due dates and costs of moving scarce resources to specific job locations. Transportation costs represent a...

  18. Water Plan 2030: A Dynamic Education Model for Teaching Water Management Issues

    NASA Astrophysics Data System (ADS)

    Rupprecht, C.; Washburne, J.; Lansey, K.; Williams, A.

    2006-12-01

    Dynamic educational tools to assist teachers and students in recognizing the impacts of water management decisions in a realistic context are not readily available. Water policy issues are often complex and difficult for students trying to make meaningful connections between system components. To fill this need, we have developed a systems modeling-based educational decision support system (DSS) with supplementary materials. This model, called Water Plan 2030, represents a general semi-arid watershed; it allows users to examine water management alternatives by changing input values for various water uses and basin conditions and immediately receive graphical outputs to compare decisions. The main goal of our DSS model is to foster students' abilities to make knowledgeable decisions with regard to water resources issues. There are two reasons we have developed this model for traditional classroom settings. First, the DSS model provides teachers with a mechanism for educating students about inter-related hydrologic concepts, complex systems and facilitates discussion of water resources issues. Second, Water Plan 2030 encourages student discovery of cause/effect relationships in a dynamic, hands-on environment and develops the ability to realize the implications of water management alternatives. The DSS model has been utilized in an undergraduate, non-major science class for 5 course hours, each of the past 4 semesters. Accompanying the PC-based model are supplementary materials to improve the effectiveness of implementation by emphasizing important concepts and guiding learners through the model components. These materials include in-class tutorials, introductory questions, role-playing activities and homework extensions that have been revised after each user session, based on student and instructor feedback. Most recently, we have developed individual lessons that teach specific model functions and concepts. These modules provide teachers the flexibility to adapt

  19. Managing MDO Software Development Projects

    NASA Technical Reports Server (NTRS)

    Townsend, J. C.; Salas, A. O.

    2002-01-01

    Over the past decade, the NASA Langley Research Center developed a series of 'grand challenge' applications demonstrating the use of parallel and distributed computation and multidisciplinary design optimization. All but the last of these applications were focused on the high-speed civil transport vehicle; the final application focused on reusable launch vehicles. Teams of discipline experts developed these multidisciplinary applications by integrating legacy engineering analysis codes. As teams became larger and the application development became more complex with increasing levels of fidelity and numbers of disciplines, the need for applying software engineering practices became evident. This paper briefly introduces the application projects and then describes the approaches taken in project management and software engineering for each project; lessons learned are highlighted.

  20. The Partnership between Project Management and Organizational Change: Integrating Change Management with Change Leadership

    ERIC Educational Resources Information Center

    Griffith-Cooper, Barber; King, Karyl

    2007-01-01

    The nature of project management is change. Even though all knowledge areas in the Project Management Body of Knowledge (PMBOK) are rooted in controlling change, none of these areas specifically addresses the human elements of change. There is a significant distinction between directly controlling change relative to the nonhuman aspects of a…