Sample records for team mission goals

  1. The Geospace Mission Definition Team report

    NASA Astrophysics Data System (ADS)

    Kintner, P.; Spann, J.

    The Geospace Mission Definition Team (GMDT) is the portion of the Living With a Star (LWS) Program that has been charged by NASA to examine how the Geospace environment responds to solar variability. The goal is to provide science recommendations that guide NASA in the formulation of Geospace missions. The GMDT's first meeting with September 10, 2001 and has met on four subsequent dates. The top level space weather effects were initially defined by the LWS Science Architecture Team (SAT). From these effects the GMDT has distilled general objectives and specific objectives. These objectives have been prioritized and compelling science questions have been identified that are required to address the objectives. A set of candidate missions has been defined with minimum, baseline, and augmentation measurements identified. The priority science questions focus on two broad areas: (1) ionospheric variability, especially at mid-latitudes, that affects navigation and communications and (2) the source, acceleration mechanisms, and sinks of the radiation belts that degrade satellite lifetimes, produce surface charging, and threaten manned space flight. In addition the measurements required for understanding ionospheric variability will also address science issues associated with thermospheric satellite drag and orbital prediction. Candidate missions to address these science focii have been developed and studied. The team concludes that it is possible to address the compelling science questions with a cost effective program that yields major advances in our understanding of space weather science, that inspires and validates better ionospheric and magnetospheric models, and that will enable operational advances mitigating the societal impacts of space weather.

  2. Essentials for Team Based Rehearsals and the Differences Between Earth Orbiting and Deep Space Missions

    NASA Technical Reports Server (NTRS)

    Gomez-Rosa, Carlos; Cifuentes, Juan; Wasiak, Francis; Alfonzo, Agustin

    2015-01-01

    The mission readiness environment is where spacecraft and ground systems converge to form the entire as built flight system for the final phase of operationally-themed testing. For most space missions, this phase starts between nine to twelve months prior to the planned launch. In the mission readiness environment, the goal is to perform sufficient testing to exercise the flight teams and systems through all mission phases in order to demonstrate that all elements are ready to support. As part of the maturation process, a mission rehearsal program is introduced to focus on team processes within the final flight system, in a more realistic operational environment. The overall goal for a mission rehearsal program is to: 1) ensure all flight system elements are able to meet mission objectives as a cohesive team; 2) reduce the risk in space based operations due to deficiencies in people, processes, procedures, or systems; and 3) instill confidence in the teams that will execute these first time flight activities. A good rehearsal program ensures critical events are exercised, discovers team or flight system nuances whose impact were previously unknown, and provides a real-time environment in which to interact with the various teams and systems. For flight team members, the rehearsal program provides experience and training in the event of planned (or unplanned) flight contingencies. To preserve the essence for team based rehearsals, this paper will explore the important elements necessary for a successful rehearsal program, document differences driven by Earth Orbiting (Aqua, Aura, Suomi-National Polar-orbiting Partnership (NPP)) and Deep Space missions (New Horizons, Mars Atmosphere and Volatile EvolutioN (MAVEN)) and discuss common challenges to both mission types. In addition, large scale program considerations and enhancements or additional steps for developing a rehearsal program will also be considered. For NASA missions, the mission rehearsal phase is a key

  3. Flight Team Development in Support of LCROSS - A Class D Mission

    NASA Technical Reports Server (NTRS)

    Tompkins, Paul D.; Hunt, Rusty; Bresina, John; Galal, Ken; Shirley, Mark; Munger, James; Sawyer, Scott

    2010-01-01

    The LCROSS (Lunar Crater Observation and Sensing Satellite) project presented a number of challenges to the preparation for mission operations. A class D mission under NASA s risk tolerance scale, LCROSS was governed by a $79 million cost cap and a 29 month schedule from "authority to proceed" to flight readiness. LCROSS was NASA Ames Research Center s flagship mission in its return to spacecraft flight operations after many years of pursuing other strategic goals. As such, ARC needed to restore and update its mission support infrastructure, and in parallel, the LCROSS project had to newly define operational practices and to select and train a flight team combining experienced operators and staff from other arenas of ARC research. This paper describes the LCROSS flight team development process, which deeply involved team members in spacecraft and ground system design, implementation and test; leveraged collaborations with strategic partners; and conducted extensive testing and rehearsals that scaled in realism and complexity in coordination with ground system and spacecraft development. As a testament to the approach, LCROSS successfully met its full mission objectives, despite many in-flight challenges, with its impact on the lunar south pole on October 9, 2009.

  4. Mission Reliability Estimation for Repairable Robot Teams

    NASA Technical Reports Server (NTRS)

    Trebi-Ollennu, Ashitey; Dolan, John; Stancliff, Stephen

    2010-01-01

    A mission reliability estimation method has been designed to translate mission requirements into choices of robot modules in order to configure a multi-robot team to have high reliability at minimal cost. In order to build cost-effective robot teams for long-term missions, one must be able to compare alternative design paradigms in a principled way by comparing the reliability of different robot models and robot team configurations. Core modules have been created including: a probabilistic module with reliability-cost characteristics, a method for combining the characteristics of multiple modules to determine an overall reliability-cost characteristic, and a method for the generation of legitimate module combinations based on mission specifications and the selection of the best of the resulting combinations from a cost-reliability standpoint. The developed methodology can be used to predict the probability of a mission being completed, given information about the components used to build the robots, as well as information about the mission tasks. In the research for this innovation, sample robot missions were examined and compared to the performance of robot teams with different numbers of robots and different numbers of spare components. Data that a mission designer would need was factored in, such as whether it would be better to have a spare robot versus an equivalent number of spare parts, or if mission cost can be reduced while maintaining reliability using spares. This analytical model was applied to an example robot mission, examining the cost-reliability tradeoffs among different team configurations. Particularly scrutinized were teams using either redundancy (spare robots) or repairability (spare components). Using conservative estimates of the cost-reliability relationship, results show that it is possible to significantly reduce the cost of a robotic mission by using cheaper, lower-reliability components and providing spares. This suggests that the

  5. Shared Goal Setting in Team-Based Geriatric Oncology

    PubMed Central

    Wallace, James; Canin, Beverly; Chow, Selina; Dale, William; Mohile, Supriya G.; Hamel, Lauren M.

    2016-01-01

    We present the case of a 92-year-old man, MH, who was given a diagnosis of colorectal cancer. His primary care physician, surgeon, geriatric oncologist, and family members all played important roles in his care. MH’s case is an example of a lack of explicit shared goal setting by the health care providers with the patient and family members and how that impeded care planning and health. This case demonstrates the importance of explicitly discussing and establishing shared goals in team-based cancer care delivery early on and throughout the care process, especially for older adults. Each individual member’s goals should be understood as they fit within the overarching shared team goals. We emphasize that shared goal setting and alignment of individual goals is a dynamic process that must occur several times at critical decision points throughout a patient’s care continuum. Providers and researchers can use this illustrative case to consider their own work and contemplate how shared goal setting can improve patient-centered care and health outcomes in various team-based care settings. Shared goal setting among team members has been demonstrated to improve outcomes in other contexts. However, we stress, that little investigation into the impact of shared goal setting on team-based cancer care delivery has been conducted. We list immediate research goals within team-based cancer care delivery that can provide a foundation for the understanding of the process and outcomes of shared goal setting. PMID:27624949

  6. Enhancing Team Performance for Long-Duration Space Missions

    NASA Technical Reports Server (NTRS)

    Orasanu, Judith M.

    2009-01-01

    Success of exploration missions will depend on skilled performance by a distributed team that includes both the astronauts in space and Mission Control personnel. Coordinated and collaborative teamwork will be required to cope with challenging complex problems in a hostile environment. While thorough preflight training and procedures will equip creW'S to address technical problems that can be anticipated, preparing them to solve novel problems is much more challenging. This presentation will review components of effective team performance, challenges to effective teamwork, and strategies for ensuring effective team performance. Teamwork skills essential for successful team performance include the behaviors involved in developing shared mental models, team situation awareness, collaborative decision making, adaptive coordination behaviors, effective team communication, and team cohesion. Challenges to teamwork include both chronic and acute stressors. Chronic stressors are associated with the isolated and confined environment and include monotony, noise, temperatures, weightlessness, poor sleep and circadian disruptions. Acute stressors include high workload, time pressure, imminent danger, and specific task-related stressors. Of particular concern are social and organizational stressors that can disrupt individual resilience and effective mission performance. Effective team performance can be developed by training teamwork skills, techniques for coping with team conflict, intracrew and intercrew communication, and working in a multicultural team; leadership and teamwork skills can be fostered through outdoor survival training exercises. The presentation will conclude with an evaluation of the special requirements associated with preparing crews to function autonomously in long-duration missions.

  7. NASA's Decadal Planning Team Mars Mission Analysis Summary

    NASA Astrophysics Data System (ADS)

    Drake, Bret G.

    2007-02-01

    In June 1999 the NASA Administrator chartered an internal NASA task force, termed the Decadal Planning Team, to create new integrated vision and strategy for space exploration. The efforts of the Decadal Planning Team evolved into the Agency-wide team known as the NASA Exploration Team (NEXT). This team was also instructed to identify technology roadmaps to enable the science-driven exploration vision, established a cross-Enterprise, cross-Center systems engineering team with emphasis focused on revolutionary not evolutionary approaches. The strategy of the DPT and NEXT teams was to "Go Anywhere, Anytime" by conquering key exploration hurdles of space transportation, crew health and safety, human/robotic partnerships, affordable abundant power, and advanced space systems performance. Early emphasis was placed on revolutionary exploration concepts such as rail gun and electromagnetic launchers, propellant depots, retrograde trajectories, nano structures, and gas core nuclear rockets to name a few. Many of these revolutionary concepts turned out to be either not feasible for human exploration missions or well beyond expected technology readiness for near-term implementation. During the DPT and NEXT study cycles, several architectures were analyzed including missions to the Earth-Sun Libration Point (L2), the Earth-Moon Gateway and L1, the lunar surface, Mars (both short and long stays), one-year round trip Mars, and near-Earth asteroids. Common emphasis of these studies included utilization of the Earth-Moon Libration Point (L1) as a staging point for exploration activities, current (Shuttle) and near-term launch capabilities (EELV), advanced propulsion, and robust space power. Although there was much emphasis placed on utilization of existing launch capabilities, the team concluded that missions in near-Earth space are only marginally feasible and human missions to Mars were not feasible without a heavy lift launch capability. In addition, the team concluded that

  8. NASA's Decadal Planning Team Mars Mission Analysis Summary

    NASA Technical Reports Server (NTRS)

    Drake, Bret G. (Editor)

    2007-01-01

    In June 1999 the NASA Administrator chartered an internal NASA task force, termed the Decadal Planning Team, to create new integrated vision and strategy for space exploration. The efforts of the Decadal Planning Team evolved into the Agency-wide team known as the NASA Exploration Team (NEXT). This team was also instructed to identify technology roadmaps to enable the science-driven exploration vision, established a cross-Enterprise, cross-Center systems engineering team with emphasis focused on revolutionary not evolutionary approaches. The strategy of the DPT and NEXT teams was to "Go Anywhere, Anytime" by conquering key exploration hurdles of space transportation, crew health and safety, human/robotic partnerships, affordable abundant power, and advanced space systems performance. Early emphasis was placed on revolutionary exploration concepts such as rail gun and electromagnetic launchers, propellant depots, retrograde trajectories, nano structures, and gas core nuclear rockets to name a few. Many of these revolutionary concepts turned out to be either not feasible for human exploration missions or well beyond expected technology readiness for near-term implementation. During the DPT and NEXT study cycles, several architectures were analyzed including missions to the Earth-Sun Libration Point (L2), the Earth-Moon Gateway and L1, the lunar surface, Mars (both short and long stays), one-year round trip Mars, and near-Earth asteroids. Common emphasis of these studies included utilization of the Earth-Moon Libration Point (L1) as a staging point for exploration activities, current (Shuttle) and near-term launch capabilities (EELV), advanced propulsion, and robust space power. Although there was much emphasis placed on utilization of existing launch capabilities, the team concluded that missions in near-Earth space are only marginally feasible and human missions to Mars were not feasible without a heavy lift launch capability. In addition, the team concluded that

  9. STS-114 Mission Management Team Meeting

    NASA Image and Video Library

    2005-08-04

    JSC2005-E-32012 (4 August 2005) --- John Muratore, Manager of Space Shuttle Systems Engineering & Integration Office, discusses a key STS-114 issue during the Mission Management Team (MMT) session of the afternoon of August 4. The MMT meets daily in Houston's Mission Control Center.

  10. Science Goal Monitor: Science Goal Driven Automation for NASA Missions

    NASA Technical Reports Server (NTRS)

    Koratkar, Anuradha; Grosvenor, Sandy; Jung, John; Pell, Melissa; Matusow, David; Bailyn, Charles

    2004-01-01

    Infusion of automation technologies into NASA s future missions will be essential because of the need to: (1) effectively handle an exponentially increasing volume of scientific data, (2) successfully meet dynamic, opportunistic scientific goals and objectives, and (3) substantially reduce mission operations staff and costs. While much effort has gone into automating routine spacecraft operations to reduce human workload and hence costs, applying intelligent automation to the science side, i.e., science data acquisition, data analysis and reactions to that data analysis in a timely and still scientifically valid manner, has been relatively under-emphasized. In order to introduce science driven automation in missions, we must be able to: capture and interpret the science goals of observing programs, represent those goals in machine interpretable language; and allow spacecrafts onboard systems to autonomously react to the scientist's goals. In short, we must teach our platforms to dynamically understand, recognize, and react to the scientists goals. The Science Goal Monitor (SGM) project at NASA Goddard Space Flight Center is a prototype software tool being developed to determine the best strategies for implementing science goal driven automation in missions. The tools being developed in SGM improve the ability to monitor and react to the changing status of scientific events. The SGM system enables scientists to specify what to look for and how to react in descriptive rather than technical terms. The system monitors streams of science data to identify occurrences of key events previously specified by the scientist. When an event occurs, the system autonomously coordinates the execution of the scientist s desired reactions. Through SGM, we will improve om understanding about the capabilities needed onboard for success, develop metrics to understand the potential increase in science returns, and develop an operational prototype so that the perceived risks associated

  11. Antecedents of team potency and team effectiveness: an examination of goal and process clarity and servant leadership.

    PubMed

    Hu, Jia; Liden, Robert C

    2011-07-01

    Integrating theories of self-regulation with team and leadership literatures, this study investigated goal and process clarity and servant leadership as 3 antecedents of team potency and subsequent team effectiveness, operationalized as team performance and organizational citizenship behavior. Our sample of 304 employees represented 71 teams in 5 banks. Results showed that team-level goal and process clarity as well as team servant leadership served as 3 antecedents of team potency and subsequent team performance and team organizational citizenship behavior. Furthermore, we found that servant leadership moderated the relationships between both goal and process clarity and team potency, such that the positive relationships between both goal and process clarity and team potency were stronger in the presence of servant leadership.

  12. A season-long team-building intervention: examining the effect of team goal setting on cohesion.

    PubMed

    Senécal, Julie; Loughead, Todd M; Bloom, Gordon A

    2008-04-01

    The purpose of the current study was to determine whether the implementation of a season-long team-building intervention program using team goal setting increased perceptions of cohesion. The participants were 86 female high school basketball players from 8 teams. The teams were randomly assigned to either an experimental team goal-setting or control condition. Each participant completed the Group Environment Questionnaire (GEQ; Carron, Brawley, & Widmeyer, 2002; Carron, Widmeyer, & Brawley, 1985), which assessed cohesion at both the beginning and end of the season. Overall, the results revealed a significant multivariate effect, Pillai's trace F(12, 438) = 2.68, p = .002. Post hoc analyses showed that at the beginning of the season, athletes from both conditions did not differ in their perceptions of cohesion. However, at the end of the season, athletes in the team goal-setting condition held higher perceptions of cohesion than athletes in the control condition. Overall, the results indicated that team goal setting was an effective team-building tool for influencing cohesiveness in sport teams.

  13. Members Matter in Team Training: Multilevel and Longitudinal Relationships between Goal Orientation, Self-Regulation, and Team Outcomes

    ERIC Educational Resources Information Center

    Dierdorff, Erich C.; Ellington, J. Kemp

    2012-01-01

    Longitudinal data from 338 individuals across 64 teams in a simulation-based team-training context were used to examine the effects of dispositional goal orientation on self-regulated learning (self-efficacy and metacognition). Team goal orientation compositions, as reflected by average goal orientations of team members, were examined for…

  14. Linguistic correlates of team performance: toward a tool for monitoring team functioning during space missions.

    PubMed

    Fischer, Ute; McDonnell, Lori; Orasanu, Judith

    2007-05-01

    Approaches to mitigating the likelihood of psychosocial problems during space missions emphasize preflight measures such as team training and team composition. Additionally, it may be necessary to monitor team interactions during missions for signs of interpersonal stress. The present research was conducted to identify features in team members' communications indicative of team functioning. Team interactions were studied in the context of six computer-simulated search and rescue missions. There were 12 teams of 4 U.S. men who participated; however, the present analyses contrast the top two teams with the two least successful teams. Communications between team members were analyzed using linguistic analysis software and a coding scheme developed to characterize task-related and social dimensions of team interactions. Coding reliability was established by having two raters independently code three transcripts. Between-rater agreement ranged from 78.1 to 97.9%. Team performance was significantly associated with team members' task-related communications, specifically with the extent to which task-critical information was shared. Successful and unsuccessful teams also showed different interactive patterns, in particular concerning the frequencies of elaborations and no-responses. Moreover, task success was negatively correlated with variability in team members' word count, and positively correlated with the number of positive emotion words and the frequency of assenting relative to dissenting responses. Analyses isolated certain task-related and social features of team communication related to team functioning. Team success was associated with the extent to which team members shared task-critical information, equally participated and built on each other's contributions, showed agreement, and positive affect.

  15. Leading Teams of Higher Education Administrators: Integrating Goal Setting, Team Role, and Team Life Cycle Theories

    ERIC Educational Resources Information Center

    Posthuma, Richard; Al-Riyami, Said

    2012-01-01

    Leaders of higher education institutions can create top management teams of academic administrators to guide and improve their organizations. This study illustrates how the leadership of top management teams can be accomplished successfully through a combination of goal setting (Doran, 1981; Locke & Latham, 1990), understanding of team roles…

  16. Space Missions Trade Space Generation and Assessment Using JPL Rapid Mission Architecture (RMA) Team Approach

    NASA Technical Reports Server (NTRS)

    Moeller, Robert C.; Borden, Chester; Spilker, Thomas; Smythe, William; Lock, Robert

    2011-01-01

    The JPL Rapid Mission Architecture (RMA) capability is a novel collaborative team-based approach to generate new mission architectures, explore broad trade space options, and conduct architecture-level analyses. RMA studies address feasibility and identify best candidates to proceed to further detailed design studies. Development of RMA first began at JPL in 2007 and has evolved to address the need for rapid, effective early mission architectural development and trade space exploration as a precursor to traditional point design evaluations. The RMA approach integrates a small team of architecture-level experts (typically 6-10 people) to generate and explore a wide-ranging trade space of mission architectures driven by the mission science (or technology) objectives. Group brainstorming and trade space analyses are conducted at a higher level of assessment across multiple mission architectures and systems to enable rapid assessment of a set of diverse, innovative concepts. This paper describes the overall JPL RMA team, process, and high-level approach. Some illustrative results from previous JPL RMA studies are discussed.

  17. ABRIXAS: scientific goal and mission concept

    NASA Astrophysics Data System (ADS)

    Predehl, Peter

    1999-10-01

    ABRIXAS is a small German satellite project having the goal of surveying the sky in the x-ray band between 0.5 and 12 keV, thereby extending the former ROSAT all-sky survey towards higher energies. It consists of seven highly nested Wolter-I mirror systems which share one common focal plane camera, a CCD detector of the novel pn-type. ABRIXAS benefits from previously developed technologies or existing instruments. ABRIXAS was launched successfully into a low earth orbit by a Russian KOSMOS rocket in late April 1999. A few hours after its launch, however, the mission failed due to a battery problem. Currently, a repetition of the mission is under discussion because both the scientific goal and the mission concept are still be regarded as very attractive.

  18. Science Goals, Objectives, and Investigations of the 2016 Europa Lander Science Definition Team Report

    NASA Astrophysics Data System (ADS)

    Hand, Kevin P.; Murray, Alison; Garvin, James; and the Europa Lander Science Definition Team, Project Science Team, and Project Engineering Team.

    2017-10-01

    In June of 2016 NASA convened a 21-person team of scientists to establish the science goals, objectives, investigations, measurement requirements, and model payload of a Europa lander mission concept. The NASA HQ Charter goals, in priority order, are as follows:1) Search for evidence of life on Europa, 2) Assess the habitability of Europa via in situ techniques uniquely available to a lander mission, 3) Characterize surface and subsurface properties at the scale of the lander to support future exploration of Europa.Within Goal 1, four Objectives were developed for seeking signs of life. These include the need to: a) detect and characterize any organic indicators of past or present life, b) identify and characterize morphological, textural, and other indicators of life, c) detect and characterize any inorganic indicators of past or present life, and d) determine the provenance of Lander-sampled material. Goal 2 focuses on Europa’s habitability and ensures that even in the absence of the detection of any potential biosignatures, significant ocean world science is still achieved. Goal 3 ensures that the landing site region is quantitatively characterized in the context needed for Goals 1 and 2, and that key measurements about Europa’s ice shell are made to enable future exploration.Critically, scientific success cannot be, and should never be, contingent on finding signs of life - such criteria would be levying requirements on how the universe works. Rather, scientific success is defined here as achieving a suite of measurements such that if convincing signs of life are present on Europa’s surface they could be detected at levels comparable to those found in benchmark environments on Earth, and, further, that even if no potential biosignatures are detected, the science return of the mission will significantly advance our fundamental understanding of Europa’s chemistry, geology, geophysics, and habitability.

  19. Exploring Mission Concepts with the JPL Innovation Foundry A-Team

    NASA Technical Reports Server (NTRS)

    Ziemer, John K.; Ervin, Joan; Lang, Jared

    2013-01-01

    The JPL Innovation Foundry has established a new approach for exploring, developing, and evaluating early concepts called the A-Team. The A-Team combines innovative collaborative methods with subject matter expertise and analysis tools to help mature mission concepts. Science, implementation, and programmatic elements are all considered during an A-Team study. Methods are grouped by Concept Maturity Level (CML), from 1 through 3, including idea generation and capture (CML 1), initial feasibility assessment (CML 2), and trade space exploration (CML 3). Methods used for each CML are presented, and the key team roles are described from two points of view: innovative methods and technical expertise. A-Team roles for providing innovative methods include the facilitator, study lead, and assistant study lead. A-Team roles for providing technical expertise include the architect, lead systems engineer, and integration engineer. In addition to these key roles, each A-Team study is uniquely staffed to match the study topic and scope including subject matter experts, scientists, technologists, flight and instrument systems engineers, and program managers as needed. Advanced analysis and collaborative engineering tools (e.g. cost, science traceability, mission design, knowledge capture, study and analysis support infrastructure) are also under development for use in A-Team studies and will be discussed briefly. The A-Team facilities provide a constructive environment for innovative ideas from all aspects of mission formulation to eliminate isolated studies and come together early in the development cycle when they can provide the biggest impact. This paper provides an overview of the A-Team, its study processes, roles, methods, tools and facilities.

  20. Planning to fail: mission design for modular repairable robot teams

    NASA Technical Reports Server (NTRS)

    Stancliff, Stephen B.; Dolan, John B.; Trebi-Ollennu, Ashitey

    2005-01-01

    This paper presents a method using stochastic simulation to evaluate the reliability of robot teams consisting of modular robots. For an example planetary exploration mission we use this method to compare the performance of a repairable robot team with spare modules versus nonrepairable robot teams.

  1. Vapor Crystal Growth System (VCGS) Team in the SL POCC During the STS-42 IML-1 Mission

    NASA Technical Reports Server (NTRS)

    1992-01-01

    The primary payload for Space Shuttle Mission STS-42, launched January 22, 1992, was the International Microgravity Laboratory-1 (IML-1), a pressurized manned Spacelab module. The goal of IML-1 was to explore in depth the complex effects of weightlessness of living organisms and materials processing. Around-the-clock research was performed on the human nervous system's adaptation to low gravity and effects of microgravity on other life forms such as shrimp eggs, lentil seedlings, fruit fly eggs, and bacteria. Materials processing experiments were also conducted, including crystal growth from a variety of substances such as enzymes, mercury iodide, and a virus. The Huntsville Operations Support Center (HOSC) Spacelab Payload Operations Control Center (SL POCC) at the Marshall Space Flight Center (MSFC) was the air/ground communication channel used between the astronauts and ground control teams during the Spacelab missions. Featured is the Vapor Crystal Growth System (VCGS) team in SL POCC), during STS-42, IML-1 mission.

  2. Apollo experience report: Mission evaluation team postflight documentation

    NASA Technical Reports Server (NTRS)

    Dodson, J. W.; Cordiner, D. H.

    1975-01-01

    The various postflight reports prepared by the mission evaluation team, including the final mission evaluation report, report supplements, anomaly reports, and the 5-day mission report, are described. The procedures for preparing each report from the inputs of the various disciplines are explained, and the general method of reporting postflight results is discussed. Recommendations for postflight documentation in future space programs are included. The official requirements for postflight documentation and a typical example of an anomaly report are provided as appendixes.

  3. Grand mission versus small OPS team: Can we have both?

    NASA Technical Reports Server (NTRS)

    Garcia-Perez, Raul

    1994-01-01

    Space Missions are growing more ambitious, but resources are getting smaller. Is this is a contradiction in terms, or is it a healthy challenge? This paper offers the author's point of view as a member of a small Mission Operations Team that carries out an ambitious international mission (Ulysses ESA/NASA).

  4. The Ionospheric Connection Explorer Mission: Mission Goals and Design

    NASA Astrophysics Data System (ADS)

    Immel, T. J.; England, S. L.; Mende, S. B.; Heelis, R. A.; Englert, C. R.; Edelstein, J.; Frey, H. U.; Korpela, E. J.; Taylor, E. R.; Craig, W. W.; Harris, S. E.; Bester, M.; Bust, G. S.; Crowley, G.; Forbes, J. M.; Gérard, J.-C.; Harlander, J. M.; Huba, J. D.; Hubert, B.; Kamalabadi, F.; Makela, J. J.; Maute, A. I.; Meier, R. R.; Raftery, C.; Rochus, P.; Siegmund, O. H. W.; Stephan, A. W.; Swenson, G. R.; Frey, S.; Hysell, D. L.; Saito, A.; Rider, K. A.; Sirk, M. M.

    2018-02-01

    The Ionospheric Connection Explorer, or ICON, is a new NASA Explorer mission that will explore the boundary between Earth and space to understand the physical connection between our world and our space environment. This connection is made in the ionosphere, which has long been known to exhibit variability associated with the sun and solar wind. However, it has been recognized in the 21st century that equally significant changes in ionospheric conditions are apparently associated with energy and momentum propagating upward from our own atmosphere. ICON's goal is to weigh the competing impacts of these two drivers as they influence our space environment. Here we describe the specific science objectives that address this goal, as well as the means by which they will be achieved. The instruments selected, the overall performance requirements of the science payload and the operational requirements are also described. ICON's development began in 2013 and the mission is on track for launch in 2018. ICON is developed and managed by the Space Sciences Laboratory at the University of California, Berkeley, with key contributions from several partner institutions.

  5. The Impact of Goal Setting on Team Simulation Experience.

    ERIC Educational Resources Information Center

    Fandt, Patricia M.; And Others

    1990-01-01

    Describes a study that examined the effects of goal setting on undergraduate students competing in a computerized business simulation. Group cohesiveness is discussed, treatments for the experimental and control groups are described, perceived team success is measured, and team simulation performance is evaluated. (30 references) (LRW)

  6. Mars 2020 Science Rover: Science Goals and Mission Concept

    NASA Astrophysics Data System (ADS)

    Mustard, John F.; Beaty, D.; Bass, D.

    2013-10-01

    The Mars 2020 Science Definition Team (SDT), chartered in January 2013 by NASA, formulated a spacecraft mission concept for a science-focused, highly mobile rover to explore and investigate in detail a site on Mars that likely was once habitable. The mission, based on the Mars Science Laboratory landing and rover systems, would address, within a cost- and time-constrained framework, four objectives: (A) Explore an astrobiologically relevant ancient environment on Mars to decipher its geological processes and history, including the assessment of past habitability; (B) Assess the biosignature preservation potential within the selected geological environment and search for potential biosignatures; (C) Demonstrate significant technical progress towards the future return of scientifically selected, well-documented samples to Earth; and (D) provide an opportunity for contributed instruments from Human Exploration or Space Technology Programs. The SDT addressed the four mission objectives and six additional charter-specified tasks independently while specifically looking for synergy among them. Objectives A and B are each ends unto themselves, while Objective A is also the means by which samples are selected for objective B, and together they motivate and inform Objective C. The SDT also found that Objective D goals are well aligned with A through C. Critically, Objectives A, B, and C as an ensemble brought the SDT to the conclusion that exploration oriented toward both astrobiology and the preparation of a returnable cache of scientifically selected, well documented surface samples is the only acceptable mission concept. Importantly the SDT concluded that the measurements needed to attain these objectives were essentially identical, consisting of six types of field measurements: 1) context imaging 2) context mineralogy, 3) fine-scale imaging, 4) fine-scale mineralogy, 5) fine-scale elemental chemistry, and 6) organic matter detection. The mission concept fully addresses

  7. Mission Status at Aura Science Team MOWG Meeting: EOS Aura

    NASA Technical Reports Server (NTRS)

    Fisher, Dominic

    2016-01-01

    Presentation at the 24797-16 Earth Observing System (EOS) Aura Science Team Meeting (Mission Operations Work Group (MOWG)) at Rotterdam, Netherlands August 29, 2016. Presentation topics include mission summary, spacecraft subsystems summary, recent and planned activities, spacecraft anomalies, data capture, propellant usage and lifetime estimates, spacecraft maneuvers and ground track history, mission highlights and past spacecraft anomalies and reliability estimates.

  8. Discrete event command and control for networked teams with multiple missions

    NASA Astrophysics Data System (ADS)

    Lewis, Frank L.; Hudas, Greg R.; Pang, Chee Khiang; Middleton, Matthew B.; McMurrough, Christopher

    2009-05-01

    During mission execution in military applications, the TRADOC Pamphlet 525-66 Battle Command and Battle Space Awareness capabilities prescribe expectations that networked teams will perform in a reliable manner under changing mission requirements, varying resource availability and reliability, and resource faults. In this paper, a Command and Control (C2) structure is presented that allows for computer-aided execution of the networked team decision-making process, control of force resources, shared resource dispatching, and adaptability to change based on battlefield conditions. A mathematically justified networked computing environment is provided called the Discrete Event Control (DEC) Framework. DEC has the ability to provide the logical connectivity among all team participants including mission planners, field commanders, war-fighters, and robotic platforms. The proposed data management tools are developed and demonstrated on a simulation study and an implementation on a distributed wireless sensor network. The results show that the tasks of multiple missions are correctly sequenced in real-time, and that shared resources are suitably assigned to competing tasks under dynamically changing conditions without conflicts and bottlenecks.

  9. STS-121: Discovery Mission Management Team Briefing

    NASA Technical Reports Server (NTRS)

    2006-01-01

    The briefing opened with Bruce Buckingham (NASA Public Affairs) introducing John Shannon (Chairman, Mission Management Team, JSC), John Chapman (External Tank Project Manager), Mike Leinbach (Shuttle Launch Director), and 1st Lt. Kaleb Nordgren (USAF 45th Weather Squadron). John Shannon reported that the team for hydrogen loading was proceeding well and the external tank detanking was completed. During detanking the inspection team cracked foam caused by condensation and ice formation as the tank expanded and contracted. Aerothermal analysis and analysis fro ice formation will be completed before launch. John Chapman explained the mechanics of the external tank design, the foam cracking, bracket design, etc. Mike Leinbach discussed the inspection teams and their inspection final inspection for ice formation before and after external tank filling. The inspection team of eight very experienced personnel also use telescopes with cameras to find any problems before launch. Kaleb Nordgren discussed weather and said there was a 40% chance of weather prohibiting launch. The floor was the opened for questions from the press.

  10. Goal orientation: effects on backing up behavior, performance, efficacy, and commitment in teams.

    PubMed

    Porter, Christopher O L H

    2005-07-01

    The author examined the predictive validity of goal orientation in teams on both team process and outcome variables. Results indicate that when mean goal orientation scores were used as a way of describing team members' inputs, learning orientation was related to backing up behavior, efficacy, and commitment. The relationships between performance orientation and efficacy and commitment, however, were more complex and were clarified when task performance was also taken into account. Performance orientation had a negative effect on efficacy when task performance was low and a positive effect on commitment when task performance was high. The implications of these findings for theory and research on goal orientation in teams and team staffing are discussed. Copyright 2005 APA, all rights reserved.

  11. Cooperation, competition and goal interdependence in work teams: a multilevel approach.

    PubMed

    Aritzeta, Aitor; Balluerka, Nekane

    2006-11-01

    The aim of this research was to predict cooperative and competitive conflict management styles in 26 new start-up work teams (time 1), and after one year of functioning (time 2) in an automotive company. Vertical-horizontal, individualism-collectivism cultural patterns were used as predictive variables. It was predicted that goal interdependence would moderate the relationship between cultural patterns and conflict management styles. Because of the hierarchically nested data structure, a Multilevel Analysis approach was used. Horizontal and vertical collectivism increased cooperation, and horizontal and vertical individualism increased competition. Only when work teams had been functioning for a year, goal interdependence increased cooperation and interaction effects between goal interdependence and vertical types of individualism and collectivism were observed. Implications for team-building as organizational transformational strategies are discussed.

  12. Magic 2010 RASR Team

    DTIC Science & Technology

    2010-12-15

    MAGIC 2010 – FINAL REPORT RASR TEAM - CONTRACT NO: FA2386-10-1-4021 December 15, 2010 Final Report for AOARD Grant FA23861014021 – MAGIC ... MAGIC 2010 Competition - Robotic Research Team (RASR) Abstract: The RASR team developed a system for the coordination of groups of unmanned...accomplish those missions. Our team goal was to develop a system that can provide long term value to the war-fighter, utilizing MAGIC 2010 as a stepping

  13. Formulation Assessment and Support Team (FAST) for the Asteroid Redirect Mission (ARM)

    NASA Astrophysics Data System (ADS)

    Mazanek, Daniel D.; Abell, Paul; Reeves, David M.; NASA Asteroid Redirect Mission (ARM) Formulation Assessment and Support Team (FAST)

    2016-10-01

    The Formulation Assessment and Support Team (FAST) for the Asteroid Redirect Mission (ARM) was a two-month effort, chartered by NASA, to provide timely inputs for mission requirement formulation in support of the Asteroid Redirect Robotic Mission (ARRM) Requirements Closure Technical Interchange Meeting held December 15-16, 2015. Additionally, the FAST was tasked with developing an initial list of potential mission investigations and providing input on potential hosted payloads and partnerships. The FAST explored several aspects of potential science benefits and knowledge gain from the ARM. Expertise from the science, engineering, and technology communities was represented in exploring lines of inquiry related to key characteristics of the ARRM reference target asteroid (2008 EV5) for engineering design purposes. Specific areas of interest included target origin, spatial distribution and size of boulders, surface geotechnical properties, boulder physical properties, and considerations for boulder handling, crew safety, and containment. In order to increase knowledge gain potential from the mission, opportunities for partnerships and accompanying payloads that could be provided by domestic and international partners were also investigated. The ARM FAST final report was publicly released on February 18, 2016 and represents the FAST's final product. The report and associated public comments are being used to support mission requirements formulation and serve as an initial inquiry to the science and engineering communities relating to the characteristics of the ARRM reference target asteroid. This report also provides a suggested list of potential investigations sorted and grouped based on their likely benefit to ARM and potential relevance to NASA science and exploration goals. These potential investigations could be conducted to reduce mission risks and increase knowledge return in the areas of science, planetary defense, asteroid resources and in-situ resource

  14. Joint IKI/ROSCOSMOS - NASA Science Definition Team and concept mission to Venus based on Venera-D

    NASA Astrophysics Data System (ADS)

    Zasova, L.; Senske, D.; Economou, T.; Eismont, N.; Esposito, L.; Gerasimov, M.; Gorinov, D.; Ignatiev, N.; Ivanov, M.; Jessup, K. Lea; Khatuntsev, I.; Korablev, O.; Kremic, T.; Limaye, S.; Lomakin, I.; Martynov, A.; Ocampo, A.; Vaisberg, O.; Burdanov, A.

    2017-09-01

    NASA and IKI/Roscosmos established in 2015 a Joint Science Definition Team (JSDT), a key task of which was to codify the synergy between the goals of Venera-D with those of NASA. In addition, the JSDT studied potential NASA provided mission augmentations (experiments /elements) that could to fill identified science gaps. The first report to NASA - IKI/Roscosmos was provided in January 2017. The baseline Venera-D concept includes two elements, and orbiter and a lander, with potential contributions consisting of an aerial platform/balloon, small long-lived surface stations or a sub-satellite.

  15. Concurrent Mission and Systems Design at NASA Glenn Research Center: The Origins of the COMPASS Team

    NASA Technical Reports Server (NTRS)

    McGuire, Melissa L.; Oleson, Steven R.; Sarver-Verhey, Timothy R.

    2012-01-01

    Established at the NASA Glenn Research Center (GRC) in 2006 to meet the need for rapid mission analysis and multi-disciplinary systems design for in-space and human missions, the Collaborative Modeling for Parametric Assessment of Space Systems (COMPASS) team is a multidisciplinary, concurrent engineering group whose primary purpose is to perform integrated systems analysis, but it is also capable of designing any system that involves one or more of the disciplines present in the team. The authors were involved in the development of the COMPASS team and its design process, and are continuously making refinements and enhancements. The team was unofficially started in the early 2000s as part of the distributed team known as Team JIMO (Jupiter Icy Moons Orbiter) in support of the multi-center collaborative JIMO spacecraft design during Project Prometheus. This paper documents the origins of a concurrent mission and systems design team at GRC and how it evolved into the COMPASS team, including defining the process, gathering the team and tools, building the facility, and performing studies.

  16. President Richard Nixon visits MSC to award Apollo 13 Mission Operations team

    NASA Technical Reports Server (NTRS)

    1970-01-01

    President Richard M. Nixon introduces Sigurd A. Sjoberg (far right), Director of Flight Operations at Manned Spacecraft Center (MSC), and the four Apollo 13 Flight Directors during the Presidnet's post-mission visit to MSC. The Flight Directors are (l.-r.) Glynn S. Lunney, Eugene A. Kranz, Gerald D. Griffin and Milton L. Windler. Dr. Thomas O. Paine, NASA Administrator, is seated at left. President Nixon was on the site to present the Presidential Medal of Freedom -- the nation's highest civilian honor -- to the Apollo 13 Mission Operations Team (35600); A wide-angle, overall view of the large crowd that was on hand to see President Richard M. Nixon present the Presidnetial Medal of Freedom to the Apollo 13 Mission Operations Team. A temporary speaker's platform was erected beside bldg 1 for the occasion (35601).

  17. Building on the Cornerstone Mission: Focused LRO Workshops to Support Science Team Synergies

    NASA Astrophysics Data System (ADS)

    Keller, J. W.; Petro, N. E.

    2017-10-01

    During the Cornerstone Mission, the LRO instrument teams have identified a number of key science themes that drive their observations during the extended mission. These themes serve as a basis for the identification of the thematic workshops.

  18. Superconducting gravity gradiometer mission. Volume 2: Study team technical report

    NASA Technical Reports Server (NTRS)

    Morgan, Samuel H. (Editor); Paik, Ho Jung (Editor)

    1988-01-01

    Scientific and engineering studies and developments performed or directed by a Study Team composed of various Federal and University activities involved with the development of a three-axis superconducting gravity gradiometer integrated with a six-axis superconducting accelerometer are examined. This instrument is being developed for a future orbital mission to make precise global gravity measurements. The scientific justification and requirements for such a mission are discussed. This includes geophysics, the primary mission objective, as well as secondary objective, such as navigation and feats of fundamental laws of physics, i.e., a null test of the inverse square law of gravitation and tests of general relativity. The instrument design and status along with mission analysis, engineering assessments, and preliminary spacecraft concepts are discussed. In addition, critical spacecraft systems and required technology advancements are examined. The mission requirements and an engineering assessment of a precursor flight test of the instrument are discussed.

  19. How can leaders foster team learning? Effects of leader-assigned mastery and performance goals and psychological safety.

    PubMed

    Ashauer, Shirley A; Macan, Therese

    2013-01-01

    Learning and adapting to change are imperative as teams today face unprecedented change. Yet, an important part of learning involves challenging assumptions and addressing differences of opinion openly within a group--the kind of behaviors that pose the potential for embarrassment or threat. How can leaders foster an environment in which team members feel it is safe to take interpersonal risks in order to learn? In a study of 71 teams, we found that psychological safety and learning behavior were higher for teams with mastery than performance goal instructions or no goal instructions. Team psychological safety mediated the relationship between mastery and performance goal instructions and learning behavior. Findings contribute to our understanding of how leader-assigned goals are related to psychological safety and learning behavior in a team context, and suggest approaches to foster such processes.

  20. Superconducting gravity gradiometer mission. Volume 1: Study team executive summary

    NASA Technical Reports Server (NTRS)

    Morgan, Samuel H. (Editor); Paik, Ho Jung (Editor)

    1989-01-01

    An executive summary is presented based upon the scientific and engineering studies and developments performed or directed by a Study Team composed of various Federal and University activities involved with the development of a three-axis Superconducting Gravity Gradiometer integrated with a six-axis superconducting accelerometer. This instrument is being developed for a future orbital mission to make precise global gravity measurements. The scientific justification and requirements for such a mission are discussed. This includes geophysics, the primary mission objective, as well as secondary objectives, such as navigation and tests of fundamental laws of physics, i.e., a null test of the inverse square law of gravitation and tests of general relativity. The instrument design and status along with mission analysis, engineering assessments, and preliminary spacecraft concepts are discussed. In addition, critical spacecraft systems and required technology advancements are examined. The mission requirements and an engineering assessment of a precursor flight test of the instrument are discussed.

  1. Outperforming whom? A multilevel study of performance-prove goal orientation, performance, and the moderating role of shared team identification.

    PubMed

    Dietz, Bart; van Knippenberg, Daan; Hirst, Giles; Restubog, Simon Lloyd D

    2015-11-01

    Performance-prove goal orientation affects performance because it drives people to try to outperform others. A proper understanding of the performance-motivating potential of performance-prove goal orientation requires, however, that we consider the question of whom people desire to outperform. In a multilevel analysis of this issue, we propose that the shared team identification of a team plays an important moderating role here, directing the performance-motivating influence of performance-prove goal orientation to either the team level or the individual level of performance. A multilevel study of salespeople nested in teams supports this proposition, showing that performance-prove goal orientation motivates team performance more with higher shared team identification, whereas performance-prove goal orientation motivates individual performance more with lower shared team identification. Establishing the robustness of these findings, a second study replicates them with individual and team performance in an educational context. (c) 2015 APA, all rights reserved).

  2. MICROSCOPE mission: drag-free and attitude control system expertise activities toward the scientific team

    NASA Astrophysics Data System (ADS)

    Delavault, Stéphanie; Prieur, Pascal; Liénart, Thomas; Robert, Alain; Guidotti, Pierre-Yves

    2018-04-01

    Microscope is a CNES-ESA-ONERA-CNRS-OCA-DLR-ZARM mission dedicated to the test of the Equivalence Principle with an improved accuracy of 10-15. The 300 kg drag-free microsatellite was launched on April 25th 2016 into a 710 km dawndusk sun-synchronous orbit for a 2-year mission. To comply with stringent requirements, the drag-free and attitude control system (DFACS) involves the scientific accelerometer as main sensor and a set of 8 cold gas proportional thrusters. Once in mission mode, within the CNES drag-free expertise center (CECT) the DFACS team provides several services to the system and to the scientific mission center: cold gas monitoring and management, `Attitude' ancillary data, DFACS expertise ancillary data. For this purpose, expertise tools have been implemented in the CECT, using the flexibility and efficiency of Matlab™ utilities. This paper presents the role of the CECT within the mission and details the expertise activities of the DFACS team illustrated with some typical in flight results.

  3. Mission control team structure and operational lessons learned from the 2009 and 2010 NASA desert RATS simulated lunar exploration field tests

    NASA Astrophysics Data System (ADS)

    Bell, Ernest R.; Badillo, Victor; Coan, David; Johnson, Kieth; Ney, Zane; Rosenbaum, Megan; Smart, Tifanie; Stone, Jeffry; Stueber, Ronald; Welsh, Daren; Guirgis, Peggy; Looper, Chris; McDaniel, Randall

    2013-10-01

    The NASA Desert Research and Technology Studies (Desert RATS) is an annual field test of advanced concepts, prototype hardware, and potential modes of operation to be used on human planetary surface space exploration missions. For the 2009 and 2010 NASA Desert RATS field tests, various engineering concepts and operational exercises were incorporated into mission timelines with the focus of the majority of daily operations being on simulated lunar geological field operations and executed in a manner similar to current Space Shuttle and International Space Station missions. The field test for 2009 involved a two week lunar exploration simulation utilizing a two-man rover. The 2010 Desert RATS field test took this two week simulation further by incorporating a second two-man rover working in tandem with the 2009 rover, as well as including docked operations with a Pressurized Excursion Module (PEM). Personnel for the field test included the crew, a mission management team, engineering teams, a science team, and the mission operations team. The mission operations team served as the core of the Desert RATS mission control team and included certified NASA Mission Operations Directorate (MOD) flight controllers, former flight controllers, and astronaut personnel. The backgrounds of the flight controllers were in the areas of Extravehicular Activity (EVA), onboard mechanical systems and maintenance, robotics, timeline planning (OpsPlan), and spacecraft communicator (Capcom). With the simulated EVA operations, mechanized operations (the rover), and expectations of replanning, these flight control disciplines were especially well suited for the execution of the 2009 and 2010 Desert RATS field tests. The inclusion of an operations team has provided the added benefit of giving NASA mission operations flight control personnel the opportunity to begin examining operational mission control techniques, team compositions, and mission scenarios. This also gave the mission operations

  4. The Science Goals of the Constellation-X Mission

    NASA Technical Reports Server (NTRS)

    White, Nicholas E.; Tananbaum, Harvey; Weaver, Kimberly; Petre, Robert; Bookbinder, Jay

    2004-01-01

    The Constellation-X mission will address the questions: "What happens to matter close to a black hole?" and "What is Dark Energy?" These questions are central to the NASA Beyond Einstein Program, where Constellation-X plays a central role. The mission will address these questions by using high throughput X-ray spectroscopy to observe the effects of strong gravity close to the event horizon of black holes, and to observe the formation and evolution of clusters of galaxies in order to precisely determine Cosmological parameters. To achieve these primary science goals requires a factor of 25-100 increase in sensitivity for high resolution spectroscopy. The mission will also perform routine high- resolution X-ray spectroscopy of faint and extended X-ray source populations. This will provide diagnostic information such as density, elemental abundances, velocity, and ionization state for a wide range of astrophysical problems. This has enormous potential for the discovery of new unexpected phenomena. The Constellation-X mission is a high priority in the National Academy of Sciences McKee-Taylor Astronomy and Astrophysics Survey of new Astrophysics Facilities for the first decade of the 21st century.

  5. ETF Mission Statement document. ETF Design Center team

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1980-04-01

    The Mission Statement document describes the results, activities, and processes used in preparing the Mission Statement, facility characteristics, and operating goals for the Engineering Test Facility (ETF). Approximately 100 engineers and scientists from throughout the US fusion program spent three days at the Knoxville Mission Workshop defining the requirements that should be met by the ETF during its operating life. Seven groups were selected to consider one major category each of design and operation concerns. Each group prepared the findings of the assigned area as described in the major sections of this document. The results of the operations discussed mustmore » provide the data, knowledge, experience, and confidence to continue to the next steps beyond the ETF in making fusion power a viable energy option. The results from the ETF mission (operations are assumed to start early in the 1990's) are to bridge the gap between the base of magnetic fusion knowledge at the start of operations and that required to design the EPR/DEMO devices.« less

  6. Atmospheric Drag, Occultation `N' Ionospheric Scintillation (ADONIS) mission proposal. Alpbach Summer School 2013 Team Orange

    NASA Astrophysics Data System (ADS)

    Hettrich, Sebastian; Kempf, Yann; Perakis, Nikolaos; Górski, Jędrzej; Edl, Martina; Urbář, Jaroslav; Dósa, Melinda; Gini, Francesco; Roberts, Owen W.; Schindler, Stefan; Schemmer, Maximilian; Steenari, David; Joldžić, Nina; Glesnes Ødegaard, Linn-Kristine; Sarria, David; Volwerk, Martin; Praks, Jaan

    2015-02-01

    The Atmospheric Drag, Occultation `N' Ionospheric Scintillation mission (ADONIS) studies the dynamics of the terrestrial thermosphere and ionosphere in dependency of solar events over a full solar cycle in Low Earth Orbit (LEO). The objectives are to investigate satellite drag with in-situ measurements and the ionospheric electron density profiles with radio occultation and scintillation measurements. A constellation of two satellites provides the possibility to gain near real-time data (NRT) about ionospheric conditions over the Arctic region where current coverage is insufficient. The mission shall also provide global high-resolution data to improve assimilative ionospheric models. The low-cost constellation can be launched using a single Vega rocket and most of the instruments are already space-proven allowing for rapid development and good reliability. From July 16 to 25, 2013, the Alpbach Summer School 2013 was organised by the Austrian Research Promotion Agency (FFG), the European Space Agency (ESA), the International Space Science Institute (ISSI) and the association of Austrian space industries Austrospace in Alpbach, Austria. During the workshop, four teams of 15 students each independently developed four different space mission proposals on the topic of "Space Weather: Science, Missions and Systems", supported by a team of tutors. The present work is based on the mission proposal that resulted from one of these teams' efforts.

  7. Final Report of the NASA Office of Safety and Mission Assurance Agile Benchmarking Team

    NASA Technical Reports Server (NTRS)

    Wetherholt, Martha

    2016-01-01

    To ensure that the NASA Safety and Mission Assurance (SMA) community remains in a position to perform reliable Software Assurance (SA) on NASAs critical software (SW) systems with the software industry rapidly transitioning from waterfall to Agile processes, Terry Wilcutt, Chief, Safety and Mission Assurance, Office of Safety and Mission Assurance (OSMA) established the Agile Benchmarking Team (ABT). The Team's tasks were: 1. Research background literature on current Agile processes, 2. Perform benchmark activities with other organizations that are involved in software Agile processes to determine best practices, 3. Collect information on Agile-developed systems to enable improvements to the current NASA standards and processes to enhance their ability to perform reliable software assurance on NASA Agile-developed systems, 4. Suggest additional guidance and recommendations for updates to those standards and processes, as needed. The ABT's findings and recommendations for software management, engineering and software assurance are addressed herein.

  8. The Ganymede Interior Structure, and Magnetosphere Observer (GISMO) Mission Concept

    NASA Technical Reports Server (NTRS)

    Lynch, K. L.; Smith, I. B.; Singer, K. N.; Vogt, M. F.; Blackburn, D. G.; Chaffin, M.; Choukroun, M.; Ehsan, N.; DiBraccio, G. A.; Gibbons, L. J.; hide

    2011-01-01

    The NASA Planetary Science Summer School (PSSS) at JPL offers graduate students and young professionals a unique opportunity to learn about the mission design process. Program participants select and design a mission based on a recent NASA Science Mission Directorate Announcement of Opportunity (AO). Starting with the AO, in this case the 2009 New Frontiers AO, participants generate a set of science goals and develop a early mission concept to accomplish those goals within the constraints provided. As part of the 2010 NASA PSSS, the Ganymede Interior, Surface, and Magnetosphere Observer (GISMO) team developed a preliminary satellite design for a science mission to Jupiter's moon Ganymede. The science goals for this design focused on studying the icy moon's magnetosphere, internal structure, surface composition, geological processes, and atmosphere. By the completion of the summer school an instrument payload was selected and the necessary mission requirements were developed to deliver a spacecraft to Ganymede that would accomplish the defined science goals. This poster will discuss those science goals, the proposed spacecraft and the proposed mission design of this New Frontiers class Ganymede observer.

  9. MOTIVATION: Goals and Goal Setting

    ERIC Educational Resources Information Center

    Stratton, Richard K.

    2005-01-01

    Goal setting has great impact on a team's performance. Goals enable a team to synchronize their efforts to achieve success. In this article, the author talks about goals and goal setting. This articles complements Domain 5--Teaching and Communication (p.14) and discusses one of the benchmarks listed therein: "Teach the goal setting process and…

  10. Implicit beliefs of ability, approach-avoidance goals and cognitive anxiety among team sport athletes.

    PubMed

    Stenling, Andreas; Hassmén, Peter; Holmström, Stefan

    2014-01-01

    People's implicit beliefs of ability have been suggested as an antecedent of achievement goal adoption, which has in turn been associated with behavioural, cognitive and affective outcomes. This study examined a conditional process model with team sport athletes' approach-avoidance achievement goals as mediators between their implicit beliefs of sport ability and sport-related cognitive anxiety. We expected gender to moderate the paths from implicit beliefs of ability to approach-avoidance goals and from approach-avoidance goals to cognitive anxiety. Team sport athletes with a mean age of 20 years (163 females and 152 males) responded to questionnaires about their implicit beliefs of sport ability, approach-avoidance goals and sport-related cognitive anxiety. Incremental beliefs, gender and the interaction between them predicted mastery-approach goals. Gender also predicted mastery-avoidance goals, with females reporting higher levels than males. Mastery-avoidance goals, gender and the interaction between them predicted cognitive anxiety, with females reporting higher levels of anxiety than males. Entity beliefs positively predicted performance-avoidance goals and the interaction between performance-approach and gender predicted anxiety. The indirect effects also showed gender differences in relation to performance-approach goals. Taken together, our results suggest that coaches trying to create a facilitating climate for their male and female athletes may be wise to consider their athletes' anxiety and achievement goal patterns as these may affect both the athletes' well-being and performance.

  11. Planning a pharmacy-led medical mission trip, part 2: servant leadership and team dynamics.

    PubMed

    Brown, Dana A; Brown, Daniel L; Yocum, Christine K

    2012-06-01

    While pharmacy curricula can prepare students for the cognitive domains of pharmacy practice, mastery of the affective aspects can prove to be more challenging. At the Gregory School of Pharmacy, medical mission trips have been highly effective means of impacting student attitudes and beliefs. Specifically, these trips have led to transformational changes in student leadership capacity, turning an act of service into an act of influence. Additionally, building team unity is invaluable to the overall effectiveness of the trip. Pre-trip preparation for teams includes activities such as routine team meetings, team-building activities, and implementation of committees, as a means of promoting positive team dynamics. While in the field, team dynamics can be fostered through activities such as daily debriefing sessions, team disclosure times, and provision of medical services.

  12. Do Psychology Department Mission Statements Reflect the American Psychological Association Undergraduate Learning Goals?

    ERIC Educational Resources Information Center

    Warchal, Judith R.; Ruiz, Ana I.; You, Di

    2017-01-01

    This study focuses on the inclusion of the American Psychological Association's learning goals in the mission statements of undergraduate psychology programs across the US. We reviewed the mission statements available on websites for 1336 psychology programs listed in the Carnegie classification. Results of a content analysis revealed that of the…

  13. Effective teamwork and communication mitigate task saturation in simulated critical care air transport team missions.

    PubMed

    Davis, Bradley; Welch, Katherine; Walsh-Hart, Sharon; Hanseman, Dennis; Petro, Michael; Gerlach, Travis; Dorlac, Warren; Collins, Jocelyn; Pritts, Timothy

    2014-08-01

    Critical Care Air Transport Teams (CCATTs) are a critical component of the United States Air Force evacuation paradigm. This study was conducted to assess the incidence of task saturation in simulated CCATT missions and to determine if there are predictable performance domains. Sixteen CCATTs were studied over a 6-month period. Performance was scored using a tool assessing eight domains of performance. Teams were also assessed during critical events to determine the presence or absence of task saturation and its impact on patient care. Sixteen simulated missions were reviewed and 45 crisis events identified. Task saturation was present in 22/45 (49%) of crisis events. Scoring demonstrated that task saturation was associated with poor performance in teamwork (odds ratio [OR] = 1.96), communication (OR = 2.08), and mutual performance monitoring (OR = 1.9), but not maintenance of guidelines, task management, procedural skill, and equipment management. We analyzed the effect of task saturation on adverse patient outcomes during crisis events. Adverse outcomes occurred more often when teams were task saturated as compared to non-task-saturated teams (91% vs. 23%; RR 4.1, p < 0.0001). Task saturation is observed in simulated CCATT missions. Nontechnical skills correlate with task saturation. Task saturation is associated with worsening physiologic derangements in simulated patients. Reprint & Copyright © 2014 Association of Military Surgeons of the U.S.

  14. Managing Conflict in School Teams: The Impact of Task and Goal Interdependence on Conflict Management and Team Effectiveness

    ERIC Educational Resources Information Center

    Somech, Anit

    2008-01-01

    Purpose: Although conflict has traditionally been considered destructive, recent studies have indicated that conflict management can contribute to effective teamwork. The present study explores conflict management as a team phenomenon in schools. The author examined how the contextual variables (task interdependence, goal interdependence) are…

  15. Relationships between cooperation and goal orientation among male professional and semi-professional team athletes.

    PubMed

    Lameiras, João; Almeida, Pedro L; Garcia-Mas, Alexandre

    2014-12-01

    In team sports, athletes' goals may focus on the task (enhancing performance, developing better skills, etc.) or on ego (being better than the others, achieving superiority, etc.). This study investigated the relationships between athletes' goal orientation and their tendency to cooperate with teammates and coaches. 158 professional men (M age = 24.1 yr., SD = 4.6) who played on various sport teams participated in this study. Goal orientation was measured with the Portuguese version of the Task and Ego Orientation in Sport Questionnaire, and cooperation was measured with the Questionário de Cooperação Desportiva. Cooperation was positively correlated with task orientation, and negatively correlated with ego orientation. Overall, the findings support that in sports, directing the players' focus on task may promote prosocial behavior.

  16. Evaluating teams in extreme environments: from issues to answers.

    PubMed

    Bishop, Sheryl L

    2004-07-01

    The challenge to effectively evaluating teams in extreme environments necessarily involves a wide range of physiological, psychological, and psychosocial factors. The high reliance on technology, the growing frequency of multinational and multicultural teams, and the demand for longer duration missions all further compound the complexity of the problem. The primary goal is the insurance of human health and well-being with expectations that such priorities will naturally lead to improved chances for performance and mission success. This paper provides an overview of some of the most salient immediate challenges for selecting, training, and supporting teams in extreme environments, gives exemplars of research findings concerning these challenges, and discusses the need for future research.

  17. Attracting Students to Space Science Fields: Mission to Mars

    NASA Astrophysics Data System (ADS)

    Congdon, Donald R.; Lovegrove, William P.; Samec, Ronald G.

    Attracting high school students to space science is one of the main goals of Bob Jones University's annual Mission to Mars (MTM). MTM develops interest in space exploration through a highly realistic simulated trip to Mars. Students study and learn to appreciate the challenges of space travel including propulsion life support medicine planetary astronomy psychology robotics and communication. Broken into teams (Management Spacecraft Design Communications Life Support Navigation Robotics and Science) they address the problems specific to each aspect of the mission. Teams also learn to interact and recognize that a successful mission requires cooperation. Coordinated by the Management Team the students build a spacecraft and associated apparatus connect computers and communications equipment train astronauts on the mission simulator and program a Pathfinder-type robot. On the big day the astronauts enter the spacecraft as Mission Control gets ready to support them through the expected and unexpected of their mission. Aided by teamwork the astronauts must land on Mars perform their scientific mission on a simulated surface of mars and return home. We see the success of MTM not only in successful missions but in the students who come back year after year for another MTM.

  18. Quality Interaction Between Mission Assurance and Project Team Members

    NASA Technical Reports Server (NTRS)

    Kwong-Fu, Helenann H.; Wilson, Robert K.

    2006-01-01

    Mission Assurance independent assessments started during the development cycle and continued through post launch operations. In operations, Health and Safety of the Observatory is of utmost importance. Therefore, Mission Assurance must ensure requirements compliance and focus on process improvements required across the operational systems including new/modified products, tools, and procedures. The deployment of the interactive model involves three objectives: Team member Interaction, Good Root Cause Analysis Practices, and Risk Assessment to avoid reoccurrences. In applying this model, we use a metric based measurement process and was found to have the most significant effect, which points to the importance of focuses on a combination of root cause analysis and risk approaches allowing the engineers the ability to prioritize and quantify their corrective actions based on a well-defined set of root cause definitions (i.e. closure criteria for problem reports), success criteria and risk rating definitions.

  19. STS-121: Discovery Pre-Launch Mission Management Team Press Briefing

    NASA Technical Reports Server (NTRS)

    2006-01-01

    The briefing began with Allard Buetel (NASA Public Affairs) introducing Bill Gerstenmaier (Associate Administrator for Space Operations) who provided an update of the Mission Management team meeting. The 3 criteria reviewed by the team were: a) ascent heating; b) ice formation and c) remaining foam still intact. The ascent heating had a safety factor of 5 and posed no concern. Ice formation was not a concern. In order to insure there was no damage to the remaining foam, an 8ft. pipe with a camera attached was used to provide pictures. The boroscope pictures showed there was no damage to the brackets or foam. The inspection went very well and the foam was acceptable and ready to fly. Then the floor was open to questions from the press.

  20. A Virtual Mission Operations Center: Collaborative Environment

    NASA Technical Reports Server (NTRS)

    Medina, Barbara; Bussman, Marie; Obenschain, Arthur F. (Technical Monitor)

    2002-01-01

    The Virtual Mission Operations Center - Collaborative Environment (VMOC-CE) intent is to have a central access point for all the resources used in a collaborative mission operations environment to assist mission operators in communicating on-site and off-site in the investigation and resolution of anomalies. It is a framework that as a minimum incorporates online chat, realtime file sharing and remote application sharing components in one central location. The use of a collaborative environment in mission operations opens up the possibilities for a central framework for other project members to access and interact with mission operations staff remotely. The goal of the Virtual Mission Operations Center (VMOC) Project is to identify, develop, and infuse technology to enable mission control by on-call personnel in geographically dispersed locations. In order to achieve this goal, the following capabilities are needed: Autonomous mission control systems Automated systems to contact on-call personnel Synthesis and presentation of mission control status and history information Desktop tools for data and situation analysis Secure mechanism for remote collaboration commanding Collaborative environment for remote cooperative work The VMOC-CE is a collaborative environment that facilitates remote cooperative work. It is an application instance of the Virtual System Design Environment (VSDE), developed by NASA Goddard Space Flight Center's (GSFC) Systems Engineering Services & Advanced Concepts (SESAC) Branch. The VSDE is a web-based portal that includes a knowledge repository and collaborative environment to serve science and engineering teams in product development. It is a "one stop shop" for product design, providing users real-time access to product development data, engineering and management tools, and relevant design specifications and resources through the Internet. The initial focus of the VSDE has been to serve teams working in the early portion of the system

  1. Introduction and Mission Response Team (MRT)

    NASA Technical Reports Server (NTRS)

    Pool, Sam

    2005-01-01

    On February 1, 2003 the Space Shuttle Columbia, returning to Earth with a crew of seven astronauts, disintegrated along a track extending from California to Louisiana. Observers on the ground filmed breakup of the spacecraft. Debris fell along a 567 statute mile track from Littlefield, Texas to Fort Polk, Louisiana; the largest ever recorded debris field. At the time of the accident the National Aeronautics and Space Administration (NASA) flight surgeon on-duty at the Mission Control Center (MCC) in Houston, Texas initiated the medical contingency response. The DOD surgeon at Patrick Air Force Base was notified, NASA medical personnel were recalled and the services of Armed Forces Institute of Pathology (AFIP) were requested. Subsequent to the accident the NASA flight surgeons that had supported the crew on orbit now provided medical support to the crewmember s families. Federal Emergency Management Agency (FEMA), the National Transportation Safety Board (NTSB), the Federal Bureau of Investigation (FBI) and numerous other federal, state and local agencies along with the citizens of Texas and Louisiana responded to the disaster. Search and recovery was managed from a Disaster Field Office (DFO) established in Lufkin, Texas. Mishap Investigation Team (MIT) medical operations were managed from Barksdale Air Force Base, Louisiana. Accident investigation teams (Columbia Accident Investigation Task Force (CAITF) and Columbia Accident Investigation Board (CAIB)) appointed immediately after the disaster included current and former authorities in space medicine. In August 2003, the CAIB concluded its investigation and released its findings in a report published in February 2004.

  2. ATV Engineering Support Team Safety Console Preparation for the Johannes Kepler Mission

    NASA Astrophysics Data System (ADS)

    Chase, R.; Oliefka, L.

    2010-09-01

    This paper describes the improvements to be implemented in the Safety console position of the Engineering Support Team(EST) at the Automated Transfer Vehicle(ATV) Control Centre(ATV-CC) for the upcoming ATV Johannes Kepler mission. The ATV missions to the International Space Station are monitored and controlled from the ATV-CC in Toulouse, France. The commanding of ATV is performed by the Vehicle Engineering Team(VET) in the main control room under authority of the Flight Director. The EST performs a monitoring function in a room beside the main control room. One of the EST positions is the Safety console, which is staffed by safety engineers from ESA and the industrial prime contractor, Astrium. The function of the Safety console is to check whether the hazard controls are available throughout the mission as required by the Hazard Reports approved by the ISS Safety Review Panel. Safety console preparation activities were limited prior to the first ATV mission due to schedule constraints, and the safety engineers involved have been working to improve the readiness for ATV 2. The following steps have been taken or are in process, and will be described in this paper: • review of the implementation of Operations Control Agreement Documents(OCADs) that record the way operational hazard controls are performed to meet the needs of the Hazard Reports(typically in Flight Rules and Crew Procedures), • crosscheck of operational control needs and implementations with respect to ATV's first flight observations and post flight evaluations, with a view to identifying additional, obsolete or revised operational hazard controls, • participation in the Flight Rule review and update process carried out between missions, • participation in the assessment of anomalies observed during the first ATV mission, to ensure that any impacts are addressed in the ATV 2 safety documentation, • preparation of a Safety console handbook to provide lists of important safety aspects to be

  3. President Richard Nixon visits MSC to award Apollo 13 Mission Operations team

    NASA Image and Video Library

    1970-04-18

    S70-35600 (18 April 1970) --- President Richard M. Nixon introduces Sigurd A. Sjoberg (far right), director of Flight Operations at Manned Spacecraft Center, and the four Apollo 13 flight directors during the President?s post-mission visit to the Manned Spacecraft Center. The flight directors are, from left to right, Glynn S. Lunney, Eugene A. Kranz, Gerald D. Griffin and Milton L. Windler. Dr. Thomas O. Paine, Administrator, National Aeronautics and Space Administration, is seated at left. President Nixon was on the site to present the Presidential Medal of Freedom - the nation?s highest civilian honor -to the Apollo 13 Mission Operations Team.

  4. Asteroid Redirect Mission (ARM) Formulation Assessment and Support Team (FAST) Final Report

    NASA Technical Reports Server (NTRS)

    Mazanek, Daniel D.; Reeves, David M.; Abell, Paul A.; Asphaug, Erik; Abreu, Neyda M.; Bell, James F.; Bottke, William F.; Britt, Daniel T.; Campins, Humberto; Chodas, Paul W.; hide

    2016-01-01

    The Asteroid Redirect Mission (ARM) Formulation Assessment and Support Team (FAST) was a two-month effort, chartered by NASA, to provide timely inputs for mission requirement formulation in support of the Asteroid Redirect Robotic Mission (ARRM) Requirements Closure Technical Interchange Meeting held December 15-16, 2015, to assist in developing an initial list of potential mission investigations, and to provide input on potential hosted payloads and partnerships. The FAST explored several aspects of potential science benefits and knowledge gain from the ARM. Expertise from the science, engineering, and technology communities was represented in exploring lines of inquiry related to key characteristics of the ARRM reference target asteroid (2008 EV5) for engineering design purposes. Specific areas of interest included target origin, spatial distribution and size of boulders, surface geotechnical properties, boulder physical properties, and considerations for boulder handling, crew safety, and containment. In order to increase knowledge gain potential from the mission, opportunities for partnerships and accompanying payloads were also investigated. Potential investigations could be conducted to reduce mission risks and increase knowledge return in the areas of science, planetary defense, asteroid resources and in-situ resource utilization, and capability and technology demonstrations. This report represents the FASTâ€"TM"s final product for the ARM.

  5. President Richard Nixon visits MSC to award Apollo 13 Mission Operations team

    NASA Image and Video Library

    1970-04-18

    S70-35601 (18 April 1970) --- A wide-angle, overall view of the large crowd of people who were on hand to see President Richard M. Nixon present the Presidential Medal of Freedom to the Apollo 13 Mission Operations Team. The honor is the nation's highest civilian award. A temporary speaker's platform was erected beside Building 1 for the occasion.

  6. [Myanmar mission].

    PubMed

    Alfandari, B; Persichetti, P; Pelissier, P; Martin, D; Baudet, J

    2004-06-01

    The authors report the accomplishment of humanitarian missions in plastic surgery performed by a small team in town practice in Yangon, about their 3 years experience in Myanmar with 300 consultations and 120 surgery cases. They underline the interest of this type of mission and provide us their reflexion about team training, the type of relation with the country where the mission is conducted and the type of right team.

  7. Mission Applications Support at NASA: The Proposal Surface Water and Ocean Topography Mission

    NASA Astrophysics Data System (ADS)

    Srinivasan, Margaret; Peterson, Craig; Callahan, Phil

    2013-09-01

    The NASA Applied Sciences Program is actively supporting an agency-wide effort to formalize a mission-level data applications approach. The program goal is to engage early-phase NASA Earth satellite mission project teams with applied science representation in the flight mission planning process. The end objective is to "to engage applications-oriented users and organizations early in the satellite mission lifecycle to enable them to envision possible applications and integrate end-user needs into satellite mission planning as a way to increase the benefits to the nation."Two mission applications representatives have been selected for each early phase Tier 2 mission, including the Surface Water and Ocean Topography (SWOT) mission concept. These representatives are tasked with identifying and organizing the applications communities and developing and promoting a process for the mission to optimize the reach of existing applications efforts in order to enhance the applications value of the missions. An early project-level awareness of mission planning decisions that may increase or decrease the utility of data products to diverse user and potential user communities (communities of practice and communities of potential, respectively) has high value and potential return to the mission and to the users.Successful strategies to enhance science and practical applications of projected SWOT data streams will require engaging with and facilitating between representatives in the science, societal applications, and mission planning communities.Some of the elements of this program include:• Identify early adopters of data products• Coordinate applications team, including;Project Scientist, Payload Scientist, ProjectManager, data processing lead• Describe mission and products sufficiently inearly stage of development to effectively incorporate all potential usersProducts and activities resulting from this effort will include (but are not limited to); workshops, workshop

  8. A Data-Based Console Logger for Mission Operations Team Coordination

    NASA Technical Reports Server (NTRS)

    Thronesbery, Carroll; Malin, Jane T.; Jenks, Kenneth; Overland, David; Oliver, Patrick; Zhang, Jiajie; Gong, Yang; Zhang, Tao

    2005-01-01

    Concepts and prototypes1,2 are discussed for a data-based console logger (D-Logger) to meet new challenges for coordination among flight controllers arising from new exploration mission concepts. The challenges include communication delays, increased crew autonomy, multiple concurrent missions, reduced-size flight support teams that include multidisciplinary flight controllers during quiescent periods, and migrating some flight support activities to flight controller offices. A spiral development approach has been adopted, making simple, but useful functions available early and adding more extensive support later. Evaluations have guided the development of the D-Logger from the beginning and continue to provide valuable user influence about upcoming requirements. D-Logger is part of a suite of tools designed to support future operations personnel and crew. While these tools can be used independently, when used together, they provide yet another level of support by interacting with one another. Recommendations are offered for the development of similar projects.

  9. Spitzer observatory operations: increasing efficiency in mission operations

    NASA Astrophysics Data System (ADS)

    Scott, Charles P.; Kahr, Bolinda E.; Sarrel, Marc A.

    2006-06-01

    This paper explores the how's and why's of the Spitzer Mission Operations System's (MOS) success, efficiency, and affordability in comparison to other observatory-class missions. MOS exploits today's flight, ground, and operations capabilities, embraces automation, and balances both risk and cost. With operational efficiency as the primary goal, MOS maintains a strong control process by translating lessons learned into efficiency improvements, thereby enabling the MOS processes, teams, and procedures to rapidly evolve from concept (through thorough validation) into in-flight implementation. Operational teaming, planning, and execution are designed to enable re-use. Mission changes, unforeseen events, and continuous improvement have often times forced us to learn to fly anew. Collaborative spacecraft operations and remote science and instrument teams have become well integrated, and worked together to improve and optimize each human, machine, and software-system element. Adaptation to tighter spacecraft margins has facilitated continuous operational improvements via automated and autonomous software coupled with improved human analysis. Based upon what we now know and what we need to improve, adapt, or fix, the projected mission lifetime continues to grow - as does the opportunity for numerous scientific discoveries.

  10. Mission Design Considerations for Mars Cargo of the Human Spaceflight Architecture Team's Evolvable Mars Campaign

    NASA Technical Reports Server (NTRS)

    Sjauw, Waldy K.; McGuire, Melissa L.; Freeh, Joshua E.

    2016-01-01

    Recent NASA interest in human missions to Mars has led to an Evolvable Mars Campaign by the agency's Human Architecture Team. Delivering the crew return propulsion stages and Mars surface landers, SEP based systems are employed because of their high specific impulse characteristics enabling missions requiring less propellant although with longer transfer times. The Earth departure trajectories start from an SLS launch vehicle delivery orbit and are spiral shaped because of the low SEP thrust. Previous studies have led to interest in assessing the divide in trip time between the Earth departure and interplanetary legs of the mission for a representative SEP cargo vehicle.

  11. Ground Data System Risk Mitigation Techniques for Faster, Better, Cheaper Missions

    NASA Technical Reports Server (NTRS)

    Catena, John J.; Saylor, Rick; Casasanta, Ralph; Weikel, Craig; Powers, Edward I. (Technical Monitor)

    2000-01-01

    With the advent of faster, cheaper, and better missions, NASA Projects acknowledged that a higher level of risk was inherent and accepted with this approach. It was incumbent however upon each component of the Project whether spacecraft, payload, launch vehicle, or ground data system to ensure that the mission would nevertheless be an unqualified success. The Small Explorer (SMEX) program's ground data system (GDS) team developed risk mitigation techniques to achieve these goals starting in 1989. These techniques have evolved through the SMEX series of missions and are practiced today under the Triana program. These techniques are: (1) Mission Team Organization--empowerment of a closeknit ground data system team comprising system engineering, software engineering, testing, and flight operations personnel; (2) Common Spacecraft Test and Operational Control System--utilization of the pre-launch spacecraft integration system as the post-launch ground data system on-orbit command and control system; (3) Utilization of operations personnel in pre-launch testing--making the flight operations team an integrated member of the spacecraft testing activities at the beginning of the spacecraft fabrication phase; (4) Consolidated Test Team--combined system, mission readiness and operations testing to optimize test opportunities with the ground system and spacecraft; and (5). Reuse of Spacecraft, Systems and People--reuse of people, software and on-orbit spacecraft throughout the SMEX mission series. The SMEX ground system development approach for faster, cheaper, better missions has been very successful. This paper will discuss these risk management techniques in the areas of ground data system design, implementation, test, and operational readiness.

  12. Team Cognition in Experienced Command-and-Control Teams

    ERIC Educational Resources Information Center

    Cooke, Nancy J.; Gorman, Jamie C.; Duran, Jasmine L.; Taylor, Amanda R.

    2007-01-01

    Team cognition in experienced command-and-control teams is examined in an UAV (Uninhabited Aerial Vehicle) simulation. Five 3-person teams with experience working together in a command-and-control setting were compared to 10 inexperienced teams. Each team participated in five 40-min missions of a simulation in which interdependent team members…

  13. The SMART Theory and Modeling Team: An Integrated Element of Mission Development and Science Analysis

    NASA Technical Reports Server (NTRS)

    Hesse, Michael; Birn, J.; Denton, Richard E.; Drake, J.; Gombosi, T.; Hoshino, M.; Matthaeus, B.; Sibeck, D.

    2005-01-01

    When targeting physical understanding of space plasmas, our focus is gradually shifting away from discovery-type investigations to missions and studies that address our basic understanding of processes we know to be important. For these studies, theory and models provide physical predictions that need to be verified or falsified by empirical evidence. Within this paradigm, a tight integration between theory, modeling, and space flight mission design and execution is essential. NASA's Magnetospheric MultiScale (MMS) mission is a pathfinder in this new era of space research. The prime objective of MMS is to understand magnetic reconnection, arguably the most fundamental of plasma processes. In particular, MMS targets the microphysical processes, which permit magnetic reconnection to operate in the collisionless plasmas that permeate space and astrophysical systems. More specifically, MMS will provide closure to such elemental questions as how particles become demagnetized in the reconnection diffusion region, which effects determine the reconnection rate, and how reconnection is coupled to environmental conditions such as magnetic shear angles. Solutions to these problems have remained elusive in past and present spacecraft missions primarily due to instrumental limitations - yet they are fundamental to the large-scale dynamics of collisionless plasmas. Owing to the lack of measurements, most of our present knowledge of these processes is based on results from modern theory and modeling studies of the reconnection process. Proper design and execution of a mission targeting magnetic reconnection should include this knowledge and have to ensure that all relevant scales and effects can be resolved by mission measurements. The SMART mission has responded to this need through a tight integration between instrument and theory and modeling teams. Input from theory and modeling is fed into all aspects of science mission design, and theory and modeling activities are tailored

  14. Using AUTORAD for Cassini File Uplinks: Incorporating Automated Commanding into Mission Operations

    NASA Technical Reports Server (NTRS)

    Goo, Sherwin

    2014-01-01

    As the Cassini spacecraft embarked on the Solstice Mission in October 2010, the flight operations team faced a significant challenge in planning and executing the continuing tour of the Saturnian system. Faced with budget cuts that reduced the science and engineering staff by over a third in size, new and streamlined processes had to be developed to allow the Cassini mission to maintain a high level of science data return with a lower amount of available resources while still minimizing the risk. Automation was deemed an important key in enabling mission operations with reduced workforce and the Cassini flight team has made this goal a priority for the Solstice Mission. The operations team learned about a utility called AUTORAD which would give the flight operations team the ability to program selected command files for radiation up to seven days in advance and help minimize the need for off-shift support that could deplete available staffing during the prime shift hours. This paper will describe how AUTORAD is being utilized by the Cassini flight operations team and the processes that were developed or modified to ensure that proper oversight and verification is maintained in the generation and execution of radiated command files.

  15. Historical Trends of Participation of Women Scientists in Robotic Spacecraft Mission Science Teams: Effect of Participating Scientist Programs

    NASA Astrophysics Data System (ADS)

    Rathbun, Julie A.; Castillo-Rogez, Julie; Diniega, Serina; Hurley, Dana; New, Michael; Pappalardo, Robert T.; Prockter, Louise; Sayanagi, Kunio M.; Schug, Joanna; Turtle, Elizabeth P.; Vasavada, Ashwin R.

    2016-10-01

    Many planetary scientists consider involvement in a robotic spacecraft mission the highlight of their career. We have searched for names of science team members and determined the percentage of women on each team. We have limited the lists to members working at US institutions at the time of selection. We also determined the year each team was selected. The gender of each team member was limited to male and female and based on gender expression. In some cases one of the authors knew the team member and what pronouns they use. In other cases, we based our determinations on the team member's name or photo (obtained via a google search, including institution). Our initial analysis considered 22 NASA planetary science missions over a period of 41 years and only considered NASA-selected PI and Co-Is and not participating scientists, postdocs, or graduate students. We found that there has been a dramatic increase in participation of women on spacecraft science teams since 1974, from 0-2% in the 1970s - 1980s to an average of 14% 2000-present. This, however, is still lower than the recent percentage of women in planetary science, which 3 different surveys found to be ~25%. Here we will present our latest results, which include consideration of participating scientists. As in the case of PIs and Co-Is, we consider only participating scientists working at US institutions at the time of their selection.

  16. Systems Engineering Lessons Learned for Class D Missions

    NASA Technical Reports Server (NTRS)

    Rojdev, Kristina; Piatek, Irene; Moore, Josh; Calvert, Derek

    2015-01-01

    One of NASA's goals within human exploration is to determine how to get humans to Mars safely and to live and work on the Martian surface. To accomplish this goal, several smaller missions act as stepping-stones to the larger end goal. NASA uses these smaller missions to develop new technologies and learn about how to survive outside of Low Earth Orbit for long periods. Additionally, keeping a cadence of these missions allows the team to maintain proficiency in the complex art of bringing spacecraft to fruition. Many of these smaller missions are robotic in nature and have smaller timescales, whereas there are others that involve crew and have longer mission timelines. Given the timelines associated with these various missions, different levels of risk and rigor need to be implemented to be more in line with what is appropriate for the mission. Thus, NASA has four different classifications that range from Class A to Class D based on the mission details. One of these projects is the Resource Prospector (RP) Mission, which is a multi-center and multi-institution collaborative project to search for volatiles in the polar regions of the Moon. The RP mission is classified as a Class D mission and as such, has the opportunity to more tightly manage, and therefore accept, greater levels of risk. The requirements for Class D missions were at the forefront of the design and thus presented unique challenges in vehicle development and systems engineering processes. This paper will discuss the systems engineering process at NASA and how that process is tailored for Class D missions, specifically the RP mission.

  17. Reference Mission Version 3.0 Addendum to the Human Exploration of Mars: The Reference Mission of the NASA Mars Exploration Study Team. Addendum; 3.0

    NASA Technical Reports Server (NTRS)

    Drake, Bret G. (Editor)

    1998-01-01

    This Addendum to the Mars Reference Mission was developed as a companion document to the NASA Special Publication 6107, "Human Exploration of Mars: The Reference Mission of the NASA Mars Exploration Study Team." It summarizes changes and updates to the Mars Reference Missions that were developed by the Exploration Office since the final draft of SP 6107 was printed in early 1999. The Reference Mission is a tool used by the exploration community to compare and evaluate approaches to mission and system concepts that could be used for human missions to Mars. It is intended to identify and clarify system drivers, significant sources of cost, performance, risk, and schedule variation. Several alternative scenarios, employing different technical approaches to solving mission and technology challenges, are discussed in this Addendum. Comparing alternative approaches provides the basis for continual improvement to technology investment plan and a general understanding of future human missions to Mars. The Addendum represents a snapshot of work in progress in support of planning for future human exploration missions through May 1998.

  18. Orbiter data reduction complex data processing requirements for the OFT mission evaluation team (level C)

    NASA Technical Reports Server (NTRS)

    1979-01-01

    This document addresses requirements for post-test data reduction in support of the Orbital Flight Tests (OFT) mission evaluation team, specifically those which are planned to be implemented in the ODRC (Orbiter Data Reduction Complex). Only those requirements which have been previously baselined by the Data Systems and Analysis Directorate configuration control board are included. This document serves as the control document between Institutional Data Systems Division and the Integration Division for OFT mission evaluation data processing requirements, and shall be the basis for detailed design of ODRC data processing systems.

  19. Large Area X-ray Spectroscopy Mission

    NASA Technical Reports Server (NTRS)

    Tananbaum, Harvey

    1996-01-01

    The Large Area X-ray Spectroscopy (LAXS) mission study concept has evolved strongly over the last year culminating in the merging of LAXS with the Goddard Space Flight Center (GSFC) proposal for a similar mission, the Next Generation X-ray Observatory (NGXO, PI: Nick White). The resulting merger, re-named the High Throughput X-rays Spectroscopy (HTXS) Mission has also expanded by the inclusion of another SAO proposed new mission concept proposal, the Hard X-Ray Telescope (PI: Paul Gorenstein). The resultant multi-instrument mission retains much of heritage from the LAXS proposal, including the use of multiple satellites for robustness. These mergers resulted from a series of contacts between various team members, via e-mail, telecons, and in-person meetings. The impetus for the mergers was the fundamental similarity between the missions, and the recognition that all three proposal teams had significant contributions to make in the effort to define the next stage in the X-ray exploration of the universe. We have enclosed four items that represent some of the work that has occurred during the first year of the study: first, a presentation at the Leicester meeting, second a presentation that was made to Dan Goldin following the merging of LAXS and NGXO, third a copy of the first announcement for the Workshop, and finally the interim report that was prepared by the HTXS study team towards the end of the first year. This last document provides the foundation for the HTXS Technology Roadmap that is being generated. The HTXS roadmap will define the near-term goals that the merged mission must achieve over the next few years. A web site has been developed and populated that contains much of the material that has been generated over the past year.

  20. Improved OSC Amtec generator design to meet goals of JPL's candidate Europa Orbiter mission

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schock, A.; Noravian, H.; Or, C.

    1998-07-01

    The preceding paper (Paper IECEC.98.244) described OSC's initial designs of AMTEC (Alkali Metal Thermal-to-Electrical Conversion) power systems, consisting of one or two generators, each with 2, 3, or 4 General Purpose Heat Source (GPHS) modules and with 16 refractory AMTEC cells containing 5 Beta Alumina Solid Electrolyte (BASE) tubes; and presented the effect of heat input and voltage output on the generator's BOM evaporator and clad temperatures and on its EOM system efficiency and power output. Comparison of the computed results with JPL's goals for the Europa Orbiter mission showed that all of the initial 16-cell design options yielded eithermore » excessive evaporator and clad temperatures or insufficient EOM power to satisfy the JPL-specified mission goals. The present paper describes modified OSC generator designs with different numbers of AMTEC cells, cell diameters, cell lengths, cell materials, BASE tube lengths, and number of tubes per cell. These efforts succeeded in identifying generator designs with only half the number of AMTEC cells which -- for the same assumptions -- can produce EOM power outputs substantially in excess of JPL's goals for NASA's Europa Orbiter mission while operating well below the prescribed BOM limits on evaporator and clad temperature; and revealed that lowering the emissivity of the generator's housing to raise the cells' condenser temperatures can achieve substantial additional performance improvement. Finally, the paper culminates in programmatic recommendations.« less

  1. A Very Small Astrometry Satellite, Nano-JASMINE: Its Telescope and Mission Goals

    NASA Astrophysics Data System (ADS)

    Hatsutori, Yoichi; Suganuma, Masahiro; Kobayashi, Yukiyasu; Gouda, Naoteru; Yano, Taihei; Yamada, Yoshiyuki; Yamauchi, Masahiro

    This paper introduces a small astrometry satellite, Nano-JASMINE. Nano-JASMINE is mounted a 5-cm effective diameter telescope and aims to measure positions of ten or twenty thousands of stars of z ≤ 8 mag for all-sky with the accuracy of a few milli-arcseconds. The mission goals are clarified and the current status of development of the telescope is reported.

  2. Coordinating Robot Teams for Disaster Relief

    DTIC Science & Technology

    2015-05-01

    eventually guide vehicles in cooperation with its Operator(s), but in this paper we assume static mission goals, a fixed number of vehicles, and a...is tedious and error prone. Kress-Gazit et al. (2009) instead synthesize an FSA from an LTL specification using a game theory approach (Bloem et al...helping an Operator coordinate a team of vehicles in Disaster Relief. Acknowledgements Thanks to OSD ASD (R&E) for sponsoring this research. The

  3. Fundamentals for Team Based Rehearsals and the Differences Between Low Earth and Deep Space Missions

    NASA Technical Reports Server (NTRS)

    Gomez-Rosa, Carlos; Alfonzo, Agustin; Cifuentes, Juan; Wasiak, Francis

    2015-01-01

    Presentation to be presented at the 2015 IEEE Aerospace Conference, Big Sky, Montana, March 7-14-2015.Rehearsals are mission level readiness tests that exercise personnel, operational process, and flight products, in a near flight like environment. The program is started 6-9 months prior to launch and is used to ensure the final as built system will meet mission goals (i.e. validation). On Deep Space missions you rehearse cruise activities post launch!Focus on critical activities to the mission, (i.e. propulsive maneuvers, instrument commissioning and any first time events or coordinating activities that involve major stakeholders).

  4. The NASA X-Ray Mission Concepts Study

    NASA Technical Reports Server (NTRS)

    Petre, Robert; Ptak, A.; Bookbinder, J.; Garcia, M.; Smith, R.; Bautz, M.; Bregman, J.; Burrows, D.; Cash, W.; Jones-Forman, C.; hide

    2012-01-01

    The 2010 Astrophysics Decadal Survey recommended a significant technology development program towards realizing the scientific goals of the International X-ray Observatory (IXO). NASA has undertaken an X-ray mission concepts study to determine alternative approaches to accomplishing IXO's high ranking scientific objectives over the next decade given the budget realities, which make a flagship mission challenging to implement. The goal of the study is to determine the degree to which missions in various cost ranges from $300M to $2B could fulfill these objectives. The study process involved several steps. NASA released a Request for Information in October 2011, seeking mission concepts and enabling technology ideas from the community. The responses included a total of 14 mission concepts and 13 enabling technologies. NASA also solicited membership for and selected a Community Science Team (CST) to guide the process. A workshop was held in December 2011 in which the mission concepts and technology were presented and discussed. Based on the RFI responses and the workshop, the CST then chose a small group of notional mission concepts, representing a range of cost points, for further study. These notional missions concepts were developed through mission design laboratory activities in early 2012. The results of all these activities were captured in the final X-ray mission concepts study report, submitted to NASA in July 2012. In this presentation, we summarize the outcome of the study. We discuss background, methodology, the notional missions, and the conclusions of the study report.

  5. How Does a Sales Team Reach Goals in Intercultural Business Negotiations? A Case Study

    ERIC Educational Resources Information Center

    Vuorela, Taina

    2005-01-01

    This paper is a report of an on-going study of intercultural business negotiations. Two meetings were under scrutiny: a company-internal strategy meeting of a sales team ("the sellers' internal meeting"), which was analysed on a general level for goals and other background information; a client negotiation with the same sellers meeting a potential…

  6. Goal-Driven Autonomy and Robust Architecture for Long-Duration Missions (Year 1: 1 July 2013 - 31 July 2014)

    DTIC Science & Technology

    2014-09-30

    Mental Domain = Ω Goal Management goal change goal input World =Ψ Memory Mission & Goals( ) World Model (-Ψ) Episodic Memory Semantic Memory ...Activations Trace Meta-Level Control Introspective Monitoring Memory Reasoning Trace ( ) Strategies Episodic Memory Metaknowledge Self Model...it is from incorrect or missing memory associations (i.e., indices). Similarly, correct information may exist in the input stream, but may not be

  7. When Teams Fail to Self-Regulate: Predictors and Outcomes of Team Procrastination Among Debating Teams.

    PubMed

    Van Hooft, Edwin A J; Van Mierlo, Heleen

    2018-01-01

    Models of team development have indicated that teams typically engage in task delay during the first stages of the team's life cycle. An important question is to what extent this equally applies to all teams, or whether there is variation across teams in the amount of task delay. The present study introduces the concept of team procrastination as a lens through which we can examine whether teams collectively engage in unplanned, voluntary, and irrational delay of team tasks. Based on theory and research on self-regulation, team processes, and team motivation we developed a conceptual multilevel model of predictors and outcomes of team procrastination. In a sample of 209 student debating teams, we investigated whether and why teams engage in collective procrastination as a team, and what consequences team procrastination has in terms of team member well-being and team performance. The results supported the existence of team procrastination as a team-level construct that has some stability over time. The teams' composition in terms of individual-level trait procrastination, as well as the teams' motivational states (i.e., team learning goal orientation, team performance-approach goal orientation in interaction with team efficacy) predicted team procrastination. Team procrastination related positively to team members' stress levels, especially for those low on trait procrastination. Furthermore, team procrastination had an indirect negative relationship with team performance, through teams' collective stress levels. These findings add to the theoretical understanding of self-regulatory processes of teams, and highlight the practical importance of paying attention to team-level states and processes such as team goal orientation and team procrastination.

  8. Web 2.0 Systems in the Brigade Combat Team as an Enabler of Mission Command: A Dialectic in Information Discourse

    DTIC Science & Technology

    2016-06-10

    WEB 2.0 SYSTEMS IN THE BRIGADE COMBAT TEAM AS AN ENABLER OF MISSION COMMAND: A DIALECTIC IN INFORMATION DISCOURSE A thesis......This qualitative research in the field of information science aims to examine the use of Web 2.0 systems in the Brigade Combat Team as an enabler of

  9. Reinventing The Design Process: Teams and Models

    NASA Technical Reports Server (NTRS)

    Wall, Stephen D.

    1999-01-01

    The future of space mission designing will be dramatically different from the past. Formerly, performance-driven paradigms emphasized data return with cost and schedule being secondary issues. Now and in the future, costs are capped and schedules fixed-these two variables must be treated as independent in the design process. Accordingly, JPL has redesigned its design process. At the conceptual level, design times have been reduced by properly defining the required design depth, improving the linkages between tools, and managing team dynamics. In implementation-phase design, system requirements will be held in crosscutting models, linked to subsystem design tools through a central database that captures the design and supplies needed configuration management and control. Mission goals will then be captured in timelining software that drives the models, testing their capability to execute the goals. Metrics are used to measure and control both processes and to ensure that design parameters converge through the design process within schedule constraints. This methodology manages margins controlled by acceptable risk levels. Thus, teams can evolve risk tolerance (and cost) as they would any engineering parameter. This new approach allows more design freedom for a longer time, which tends to encourage revolutionary and unexpected improvements in design.

  10. Science goals and mission concept for the future exploration of Titan and Enceladus

    NASA Astrophysics Data System (ADS)

    Tobie, G.; Teanby, N. A.; Coustenis, A.; Jaumann, R.; Raulin, F.; Schmidt, J.; Carrasco, N.; Coates, A. J.; Cordier, D.; De Kok, R.; Geppert, W. D.; Lebreton, J.-P.; Lefevre, A.; Livengood, T. A.; Mandt, K. E.; Mitri, G.; Nimmo, F.; Nixon, C. A.; Norman, L.; Pappalardo, R. T.; Postberg, F.; Rodriguez, S.; Schulze-Makuch, D.; Soderblom, J. M.; Solomonidou, A.; Stephan, K.; Stofan, E. R.; Turtle, E. P.; Wagner, R. J.; West, R. A.; Westlake, J. H.

    2014-12-01

    Saturn's moons, Titan and Enceladus, are two of the Solar System's most enigmatic bodies and are prime targets for future space exploration. Titan provides an analogue for many processes relevant to the Earth, more generally to outer Solar System bodies, and a growing host of newly discovered icy exoplanets. Processes represented include atmospheric dynamics, complex organic chemistry, meteorological cycles (with methane as a working fluid), astrobiology, surface liquids and lakes, geology, fluvial and aeolian erosion, and interactions with an external plasma environment. In addition, exploring Enceladus over multiple targeted flybys will give us a unique opportunity to further study the most active icy moon in our Solar System as revealed by Cassini and to analyse in situ its active plume with highly capable instrumentation addressing its complex chemistry and dynamics. Enceladus' plume likely represents the most accessible samples from an extra-terrestrial liquid water environment in the Solar system, which has far reaching implications for many areas of planetary and biological science. Titan with its massive atmosphere and Enceladus with its active plume are prime planetary objects in the Outer Solar System to perform in situ investigations. In the present paper, we describe the science goals and key measurements to be performed by a future exploration mission involving a Saturn-Titan orbiter and a Titan balloon, which was proposed to ESA in response to the call for definition of the science themes of the next Large-class mission in 2013. The mission scenario is built around three complementary science goals: (A) Titan as an Earth-like system; (B) Enceladus as an active cryovolcanic moon; and (C) Chemistry of Titan and Enceladus - clues for the origin of life. The proposed measurements would provide a step change in our understanding of planetary processes and evolution, with many orders of magnitude improvement in temporal, spatial, and chemical resolution

  11. From recording discrete actions to studying continuous goal-directed behaviours in team sports.

    PubMed

    Correia, Vanda; Araújo, Duarte; Vilar, Luís; Davids, Keith

    2013-01-01

    This paper highlights the importance of examining interpersonal interactions in performance analysis of team sports, predicated on the relationship between perception and action, compared to the traditional cataloguing of actions by individual performers. We discuss how ecological dynamics may provide a potential unifying theoretical and empirical framework to achieve this re-emphasis in research. With reference to data from illustrative studies on performance analysis and sport expertise, we critically evaluate some of the main assumptions and methodological approaches with regard to understanding how information influences action and decision-making during team sports performance. Current data demonstrate how the understanding of performance behaviours in team sports by sport scientists and practitioners may be enhanced with a re-emphasis in research on the dynamics of emergent ongoing interactions. Ecological dynamics provides formal and theoretically grounded descriptions of player-environment interactions with respect to key performance goals and the unfolding information of competitive performance. Developing these formal descriptions and explanations of sport performance may provide a significant contribution to the field of performance analysis, supporting design and intervention in both research and practice.

  12. Report of the Joint Scientific Mission Definition Team for an infrared astronomical satellite

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The joint effort is reported of scientists and engineers from the Netherlands, the United Kingdom, and the United States working as a team for the purpose of exploring the possibility of a cooperative venture. The proposed mission builds upon experience gained from the successful Astronomical Netherlands Satellite (ANS). This satellite will be in a polar orbit at an altitude of 900 km. It will carry an 0.6 m diameter telescope cooled with helium to a temperature near 10K. An array of approximately 100 detectors will be used to measure the infrared flux in four wavelength bands centered at 10, 20, 50, and 100 microns. Sources will be located on the sky with positional accuracy of 1/2 arcminute. The instrument should be able to investigate the structure of extended sources with angular scales up to 1.0 deg. The entire sky will be surveyed and the full lifetime of the mission of about one year will be necessary to complete the survey. Special observational programs will also be incorporated into the mission.

  13. Micro-Pressure Sensors for Future Mars Missions

    NASA Technical Reports Server (NTRS)

    Catling, David C.

    1996-01-01

    The joint research interchange effort was directed at the following principal areas: u further development of NASA-Ames' Mars Micro-meteorology mission concept as a viable NASA space mission especially with regard to the science and instrument specifications u interaction with the flight team from NASA's New Millennium 'Deep-Space 2' (DS-2) mission with regard to selection and design of micro-pressure sensors for Mars u further development of micro-pressure sensors suitable for Mars The research work undertaken in the course of the Joint Research Interchange should be placed in the context of an ongoing planetary exploration objective to characterize the climate system on Mars. In particular, a network of small probes globally-distributed on the surface of the planet has often been cited as the only way to address this particular science goal. A team from NASA Ames has proposed such a mission called the Micrometeorology mission, or 'Micro-met' for short. Surface pressure data are all that are required, in principle, to calculate the Martian atmospheric circulation, provided that simultaneous orbital measurements of the atmosphere are also obtained. Consequently, in the proposed Micro-met mission a large number of landers would measure barometric pressure at various locations around Mars, each equipped with a micro-pressure sensor. Much of the time on the JRI was therefore spent working with the engineers and scientists concerned with Micro-met to develop this particular mission concept into a more realistic proposition.

  14. The Europa Clipper Mission Concept

    NASA Astrophysics Data System (ADS)

    Pappalardo, Robert; Goldstein, Barry; Magner, Thomas; Prockter, Louise; Senske, David; Paczkowski, Brian; Cooke, Brian; Vance, Steve; Wes Patterson, G.; Craft, Kate

    2014-05-01

    A NASA-appointed Science Definition Team (SDT), working closely with a technical team from the Jet Propulsion Laboratory (JPL) and the Applied Physics Laboratory (APL), recently considered options for a future strategic mission to Europa, with the stated science goal: Explore Europa to investigate its habitability. The group considered several mission options, which were fully technically developed, then costed and reviewed by technical review boards and planetary science community groups. There was strong convergence on a favored architecture consisting of a spacecraft in Jupiter orbit making many close flybys of Europa, concentrating on remote sensing to explore the moon. Innovative mission design would use gravitational perturbations of the spacecraft trajectory to permit flybys at a wide variety of latitudes and longitudes, enabling globally distributed regional coverage of the moon's surface, with nominally 45 close flybys at altitudes from 25 to 100 km. We will present the science and reconnaissance goals and objectives, a mission design overview, and the notional spacecraft for this concept, which has become known as the Europa Clipper. The Europa Clipper concept provides a cost-efficient means to explore Europa and investigate its habitability, through understanding the satellite's ice and ocean, composition, and geology. The set of investigations derived from the Europa Clipper science objectives traces to a notional payload for science, consisting of: Ice Penetrating Radar (for sounding of ice-water interfaces within and beneath the ice shell), Topographical Imager (for stereo imaging of the surface), ShortWave Infrared Spectrometer (for surface composition), Neutral Mass Spectrometer (for atmospheric composition), Magnetometer and Langmuir Probes (for inferring the satellite's induction field to characterize an ocean), and Gravity Science (to confirm an ocean).The mission would also include the capability to perform reconnaissance for a future lander

  15. When Teams Fail to Self-Regulate: Predictors and Outcomes of Team Procrastination Among Debating Teams

    PubMed Central

    Van Hooft, Edwin A. J.; Van Mierlo, Heleen

    2018-01-01

    Models of team development have indicated that teams typically engage in task delay during the first stages of the team’s life cycle. An important question is to what extent this equally applies to all teams, or whether there is variation across teams in the amount of task delay. The present study introduces the concept of team procrastination as a lens through which we can examine whether teams collectively engage in unplanned, voluntary, and irrational delay of team tasks. Based on theory and research on self-regulation, team processes, and team motivation we developed a conceptual multilevel model of predictors and outcomes of team procrastination. In a sample of 209 student debating teams, we investigated whether and why teams engage in collective procrastination as a team, and what consequences team procrastination has in terms of team member well-being and team performance. The results supported the existence of team procrastination as a team-level construct that has some stability over time. The teams’ composition in terms of individual-level trait procrastination, as well as the teams’ motivational states (i.e., team learning goal orientation, team performance-approach goal orientation in interaction with team efficacy) predicted team procrastination. Team procrastination related positively to team members’ stress levels, especially for those low on trait procrastination. Furthermore, team procrastination had an indirect negative relationship with team performance, through teams’ collective stress levels. These findings add to the theoretical understanding of self-regulatory processes of teams, and highlight the practical importance of paying attention to team-level states and processes such as team goal orientation and team procrastination. PMID:29674991

  16. NASA's Planetary Science Summer School: Training Future Mission Leaders in a Concurrent Engineering Environment

    NASA Astrophysics Data System (ADS)

    Mitchell, K. L.; Lowes, L. L.; Budney, C. J.; Sohus, A.

    2014-12-01

    NASA's Planetary Science Summer School (PSSS) is an intensive program for postdocs and advanced graduate students in science and engineering fields with a keen interest in planetary exploration. The goal is to train the next generation of planetary science mission leaders in a hands-on environment involving a wide range of engineers and scientists. It was established in 1989, and has undergone several incarnations. Initially a series of seminars, it became a more formal mission design experience in 1999. Admission is competitive, with participants given financial support. The competitively selected trainees develop an early mission concept study in teams of 15-17, responsive to a typical NASA Science Mission Directorate Announcement of Opportunity. They select the mission concept from options presented by the course sponsors, based on high-priority missions as defined by the Decadal Survey, prepare a presentation for a proposal authorization review, present it to a senior review board and receive critical feedback. Each participant assumes multiple roles, on science, instrument and project teams. They develop an understanding of top-level science requirements and instrument priorities in advance through a series of reading assignments and webinars help trainees. Then, during the five day session at Jet Propulsion Laboratory, they work closely with concurrent engineers including JPL's Advanced Projects Design Team ("Team X"), a cross-functional multidisciplinary team of engineers that utilizes concurrent engineering methodologies to complete rapid design, analysis and evaluation of mission concept designs. All are mentored and assisted directly by Team X members and course tutors in their assigned project roles. There is a strong emphasis on making difficult trades, simulating a real mission design process as accurately as possible. The process is intense and at times dramatic, with fast-paced design sessions and late evening study sessions. A survey of PSSS alumni

  17. Flight Software for the LADEE Mission

    NASA Technical Reports Server (NTRS)

    Cannon, Howard N.

    2015-01-01

    The Lunar Atmosphere and Dust Environment Explorer (LADEE) spacecraft was launched on September 6, 2013, and completed its mission on April 17, 2014 with a directed impact to the Lunar Surface. Its primary goals were to examine the lunar atmosphere, measure lunar dust, and to demonstrate high rate laser communications. The LADEE mission was a resounding success, achieving all mission objectives, much of which can be attributed to careful planning and preparation. This paper discusses some of the highlights from the mission, and then discusses the techniques used for developing the onboard Flight Software. A large emphasis for the Flight Software was to develop it within tight schedule and cost constraints. To accomplish this, the Flight Software team leveraged heritage software, used model based development techniques, and utilized an automated test infrastructure. This resulted in the software being delivered on time and within budget. The resulting software was able to meet all system requirements, and had very problems in flight.

  18. Big Software for SmallSats: Adapting CFS to CubeSat Missions

    NASA Technical Reports Server (NTRS)

    Cudmore, Alan P.; Crum, Gary; Sheikh, Salman; Marshall, James

    2015-01-01

    Expanding capabilities and mission objectives for SmallSats and CubeSats is driving the need for reliable, reusable, and robust flight software. While missions are becoming more complicated and the scientific goals more ambitious, the level of acceptable risk has decreased. Design challenges are further compounded by budget and schedule constraints that have not kept pace. NASA's Core Flight Software System (cFS) is an open source solution which enables teams to build flagship satellite level flight software within a CubeSat schedule and budget. NASA originally developed cFS to reduce mission and schedule risk for flagship satellite missions by increasing code reuse and reliability. The Lunar Reconnaissance Orbiter, which launched in 2009, was the first of a growing list of Class B rated missions to use cFS. Large parts of cFS are now open source, which has spurred adoption outside of NASA. This paper reports on the experiences of two teams using cFS for current CubeSat missions. The performance overheads of cFS are quantified, and the reusability of code between missions is discussed. The analysis shows that cFS is well suited to use on CubeSats and demonstrates the portability and modularity of cFS code.

  19. Model of Team Organization and Behavior and Team Description Method

    DTIC Science & Technology

    1984-10-01

    cumbersome or difficult to use or which did not result in the quality of data desired were revised, or discarded and replaced by alternative procedures. The...observation and study of a variety of real-world teams performing real-world missions. Since time and resources for model development were limited, only...of equipment and supplies , team strength, terrain, weather, and illumination (if’ the mission it performed at night). Any or all of these factors may

  20. Leading and empowering the multicultural work team.

    PubMed

    Gantz, Nancy Rollins

    2002-09-01

    The multicultural team clearly is a part of the landscape in many work environments today. This article focuses on the opportunity for leaders to create a climate in which people of diverse cultures are invited into full participation as their unit contributes its very best to the achievement of the mission and goals of the organization. Within this environment, members are valued for who they are and what they share, without bearing on race, religion, ethnicity, and orientation or physical limitations.

  1. A mission to Mercury and a mission to the moons of Mars

    NASA Technical Reports Server (NTRS)

    1993-01-01

    Two Advanced Design Projects were completed this academic year at Penn State - a mission to the planet Mercury and a mission to the moons of Mars (Phobos and Deimos). At the beginning of the fall semester the students were organized into six groups and given their choice of missions. Once a mission was chosen, the students developed conceptual designs. These designs were then evaluated at the end of the fall semester and combined into two separate mission scenarios. To facilitate the work required for each mission, the class was reorganized in the spring semester by combining groups to form two mission teams. An integration team consisting of two members from each group was formed for each mission team so that communication and exchange of information would be easier among the groups. The types of projects designed by the students evolved from numerous discussions with Penn State faculty and mission planners at the Lewis Research Center Advanced Projects Office. Robotic planetary missions throughout the solar system can be considered valuable precursors to human visits and test beds for innovative technology. For example, by studying the composition of the Martian moons, scientists may be able to determine if their resources may be used or synthesized for consumption during a first human visit.

  2. A mission to Mercury and a mission to the moons of Mars

    NASA Astrophysics Data System (ADS)

    1993-07-01

    Two Advanced Design Projects were completed this academic year at Penn State - a mission to the planet Mercury and a mission to the moons of Mars (Phobos and Deimos). At the beginning of the fall semester the students were organized into six groups and given their choice of missions. Once a mission was chosen, the students developed conceptual designs. These designs were then evaluated at the end of the fall semester and combined into two separate mission scenarios. To facilitate the work required for each mission, the class was reorganized in the spring semester by combining groups to form two mission teams. An integration team consisting of two members from each group was formed for each mission team so that communication and exchange of information would be easier among the groups. The types of projects designed by the students evolved from numerous discussions with Penn State faculty and mission planners at the Lewis Research Center Advanced Projects Office. Robotic planetary missions throughout the solar system can be considered valuable precursors to human visits and test beds for innovative technology. For example, by studying the composition of the Martian moons, scientists may be able to determine if their resources may be used or synthesized for consumption during a first human visit.

  3. Human Exploration Framework Team: Strategy and Status

    NASA Technical Reports Server (NTRS)

    Muirhead, Brian K.; Sherwood, Brent; Olson, John

    2011-01-01

    Human Exploration Framework Team (HEFT) was formulated to create a decision framework for human space exploration that drives out the knowledge, capabilities and infrastructure NASA needs to send people to explore multiple destinations in the Solar System in an efficient, sustainable way. The specific goal is to generate an initial architecture that can evolve into a long term, enterprise-wide architecture that is the basis for a robust human space flight enterprise. This paper will discuss the initial HEFT activity which focused on starting up the cross-agency team, getting it functioning, developing a comprehensive development and analysis process and conducting multiple iterations of the process. The outcome of this process will be discussed including initial analysis of capabilities and missions for at least two decades, keeping Mars as the ultimate destination. Details are provided on strategies that span a broad technical and programmatic trade space, are analyzed against design reference missions and evaluated against a broad set of figures of merit including affordability, operational complexity, and technical and programmatic risk.

  4. Juno Mission Simulation

    NASA Technical Reports Server (NTRS)

    Lee, Meemong; Weidner, Richard J.

    2008-01-01

    The Juno spacecraft is planned to launch in August of 2012 and would arrive at Jupiter four years later. The spacecraft would spend more than one year orbiting the planet and investigating the existence of an ice-rock core; determining the amount of global water and ammonia present in the atmosphere, studying convection and deep- wind profiles in the atmosphere; investigating the origin of the Jovian magnetic field, and exploring the polar magnetosphere. Juno mission management is responsible for mission and navigation design, mission operation planning, and ground-data-system development. In order to ensure successful mission management from initial checkout to final de-orbit, it is critical to share a common vision of the entire mission operation phases with the rest of the project teams. Two major challenges are 1) how to develop a shared vision that can be appreciated by all of the project teams of diverse disciplines and expertise, and 2) how to continuously evolve a shared vision as the project lifecycle progresses from formulation phase to operation phase. The Juno mission simulation team addresses these challenges by developing agile and progressive mission models, operation simulations, and real-time visualization products. This paper presents mission simulation visualization network (MSVN) technology that has enabled a comprehensive mission simulation suite (MSVN-Juno) for the Juno project.

  5. Creating a Team Archive During Fast-Paced Anomaly Response Activities in Space Missions

    NASA Technical Reports Server (NTRS)

    Malin, Jane T.; Hicks, LaDessa; Overland, David; Thronesbery, Carroll; Christofferesen, Klaus; Chow, Renee

    2002-01-01

    This paper describes a Web-based system to support the temporary Anomaly Response Team formed from distributed subteams in Space Shuttle and International Space Station missions. The system was designed for easy and flexible creation of small collections of files and links associated with work on a particular anomaly. The system supports privacy and levels of formality for the subteams. First we describe the supported groups and an anomaly response scenario. Then we describe the support system prototype, the Anomaly Response Tracking and Integration System (ARTIS). Finally, we describe our evaluation approach and the results of the evaluation.

  6. "NASA's Solar System Exploration Research Virtual Institute"; - Expanded Goals and New Teams

    NASA Astrophysics Data System (ADS)

    Daou, D.; Schmidt, G. K.; Pendleton, Y.; Bailey, B. E.

    2014-04-01

    The NASA Solar System Exploration Research Virtual Institute (SSERVI) has been pursuing international partnerships since its inception as the NASA Lunar Science Institute (NLSI), in order to both leverage the science being done by its domestic member institutions as well as to help lunar science and exploration become a greater global endeavor. The international partners of the Institute have pursued a broad program of lunar science stimulated by scientific partnerships enabled by the SSERVI community. Furthermore, regional partnerships have been formed such as the new pan-European lunar science consortium, which promises both new scientific approaches and mission concepts. International partner membership requires long-term commitment from both the partner and SSERVI, together with tangible and specific plans for scientific interaction that will produce results of mutual benefit to both the institute's U.S. Teams and the international partner. International partners are invited to participate in all aspects of the Institute's activities and programs, on a basis of no exchange of funds. Through these activities, SSERVI researchers and international partners participate in sharing ideas, information, and data arising from their respective research efforts, and contribute to the training of young scientists. This talk will present an overview of the Institute and the international nodes. We will also discuss the various processes to become a SSERVI partner as well as the opportunities available for collaborations with the SSERVI national teams.

  7. Mental Workload and Performance Experiment (MWPE) Team in the Spacelab Payload Operations Control

    NASA Technical Reports Server (NTRS)

    1992-01-01

    The primary payload for Space Shuttle Mission STS-42, launched January 22, 1992, was the International Microgravity Laboratory-1 (IML-1), a pressurized manned Spacelab module. The goal of IML-1 was to explore in depth the complex effects of weightlessness of living organisms and materials processing. Around-the-clock research was performed on the human nervous system's adaptation to low gravity and effects of microgravity on other life forms such as shrimp eggs, lentil seedlings, fruit fly eggs, and bacteria. Materials processing experiments were also conducted, including crystal growth from a variety of substances such as enzymes, mercury iodide, and a virus. The Huntsville Operations Support Center (HOSC) Spacelab Payload Operations Control Center (SL POCC) at the Marshall Space Flight Center (MSFC) was the air/ground communication channel used between the astronauts and ground control teams during the Spacelab missions. Featured is the Mental Workload and Performance Experiment (MWPE) team in the SL POCC) during STS-42, IML-1 mission.

  8. Mental Workload and Performance Experiment (MWPE) Team in the Spacelab Payload Operations Control

    NASA Technical Reports Server (NTRS)

    1992-01-01

    The primary payload for Space Shuttle Mission STS-42, launched January 22, 1992, was the International Microgravity Laboratory-1 (IML-1), a pressurized manned Spacelab module. The goal of IML-1 was to explore in depth the complex effects of weightlessness of living organisms and materials processing. Around-the-clock research was performed on the human nervous system's adaptation to low gravity and effects of microgravity on other life forms such as shrimp eggs, lentil seedlings, fruit fly eggs, and bacteria. Materials processing experiments were also conducted, including crystal growth from a variety of substances such as enzymes, mercury iodide, and a virus. The Huntsville Operations Support Center (HOSC) Spacelab Payload Operations Control Center (SL POCC) at the Marshall Space Flight Center (MSFC) was the air/ground communication channel used between the astronauts and ground control teams during the Spacelab missions. Featured activities are of the Mental Workload and Performance Experiment (MWPE) team in the SL POCC during the IML-1 mission.

  9. Reconnaissance and Autonomy for Small Robots (RASR) team: MAGIC 2010 challenge

    NASA Astrophysics Data System (ADS)

    Lacaze, Alberto; Murphy, Karl; Del Giorno, Mark; Corley, Katrina

    2012-06-01

    The Reconnaissance and Autonomy for Small Robots (RASR) team developed a system for the coordination of groups of unmanned ground vehicles (UGVs) that can execute a variety of military relevant missions in dynamic urban environments. Historically, UGV operations have been primarily performed via tele-operation, requiring at least one dedicated operator per robot, and requiring substantial real-time bandwidth to accomplish those missions. Our team goal was to develop a system that can provide long-term value to the war-fighter, utilizing MAGIC-2010 as a stepping stone. To that end, we self-imposed a set of constraints that would force us to develop technology that could readily be used by the military in the near term: • Use a relevant (deployed) platform • Use low-cost, reliable sensors • Develop an expandable and modular control system with innovative software algorithms to minimize the computing footprint required • Minimize required communications bandwidth and handle communication losses • Minimize additional power requirements to maximize battery life and mission duration

  10. Human Performance Modeling and Simulation for Launch Team Applications

    NASA Technical Reports Server (NTRS)

    Peaden, Cary J.; Payne, Stephen J.; Hoblitzell, Richard M., Jr.; Chandler, Faith T.; LaVine, Nils D.; Bagnall, Timothy M.

    2006-01-01

    This paper describes ongoing research into modeling and simulation of humans for launch team analysis, training, and evaluation. The initial research is sponsored by the National Aeronautics and Space Administration's (NASA)'s Office of Safety and Mission Assurance (OSMA) and NASA's Exploration Program and is focused on current and future launch team operations at Kennedy Space Center (KSC). The paper begins with a description of existing KSC launch team environments and procedures. It then describes the goals of new Simulation and Analysis of Launch Teams (SALT) research. The majority of this paper describes products from the SALT team's initial proof-of-concept effort. These products include a nominal case task analysis and a discrete event model and simulation of launch team performance during the final phase of a shuttle countdown; and a first proof-of-concept training demonstration of launch team communications in which the computer plays most roles, and the trainee plays a role of the trainee's choice. This paper then describes possible next steps for the research team and provides conclusions. This research is expected to have significant value to NASA's Exploration Program.

  11. Advanced Russian Mission Laplace-P to Study the Planetary System of Jupiter: Scientific Goals, Objectives, Special Features and Mission Profile

    NASA Astrophysics Data System (ADS)

    Martynov, M. B.; Merkulov, P. V.; Lomakin, I. V.; Vyatlev, P. A.; Simonov, A. V.; Leun, E. V.; Barabanov, A. A.; Nasyrov, A. F.

    2017-12-01

    The advanced Russian project Laplace-P is aimed at developing and launching two scientific spacecraft (SC)— Laplace-P1 ( LP1 SC) and Laplace-P2 ( LP2 SC)—designed for remote and in-situ studies of the system of Jupiter and its moon Ganymede. The LP1 and LP2 spacecraft carry an orbiter and a lander onboard, respectively. One of the orbiter's objectives is to map the surface of Ganymede from the artificial satellite's orbit and to acquire the data for the landing site selection. The main objective of the lander is to carry out in-situ investigations of Ganymede's surface. The paper describes the scientific goals and objectives of the mission, its special features, and the LP1 and LP2 mission profiles during all of the phases—from the launch to the landing on the surface of Ganymede.

  12. Big Software for SmallSats: Adapting cFS to CubeSat Missions

    NASA Technical Reports Server (NTRS)

    Cudmore, Alan P.; Crum, Gary Alex; Sheikh, Salman; Marshall, James

    2015-01-01

    Expanding capabilities and mission objectives for SmallSats and CubeSats is driving the need for reliable, reusable, and robust flight software. While missions are becoming more complicated and the scientific goals more ambitious, the level of acceptable risk has decreased. Design challenges are further compounded by budget and schedule constraints that have not kept pace. NASA's Core Flight Software System (cFS) is an open source solution which enables teams to build flagship satellite level flight software within a CubeSat schedule and budget. NASA originally developed cFS to reduce mission and schedule risk for flagship satellite missions by increasing code reuse and reliability. The Lunar Reconnaissance Orbiter, which launched in 2009, was the first of a growing list of Class B rated missions to use cFS.

  13. Gravity Plant Physiology Facility (GPPF) Team in the Spacelab Payload Operations Control Center (SL

    NASA Technical Reports Server (NTRS)

    1992-01-01

    The primary payload for Space Shuttle Mission STS-42, launched January 22, 1992, was the International Microgravity Laboratory-1 (IML-1), a pressurized manned Spacelab module. The goal of IML-1 was to explore in depth the complex effects of weightlessness of living organisms and materials processing. Around-the-clock research was performed on the human nervous system's adaptation to low gravity and effects of microgravity on other life forms such as shrimp eggs, lentil seedlings, fruit fly eggs, and bacteria. Materials processing experiments were also conducted, including crystal growth from a variety of substances such as enzymes, mercury iodide, and a virus. The Huntsville Operations Support Center (HOSC) Spacelab Payload Operations Control Center (SL POCC) at the Marshall Space Flight Center (MSFC) was the air/ground communication channel used between the astronauts and ground control teams during the Spacelab missions. Featured is the Gravity Plant Physiology Facility (GPPF) team in the SL POCC during the IML-1 mission.

  14. Developing a Habitat for Long Duration, Deep Space Missions

    NASA Technical Reports Server (NTRS)

    Rucker, Michelle A.; Thompson, Shelby

    2011-01-01

    One possible next leap in human space exploration is a mission to a near Earth asteroid (NEA). In order to achieve such an ambitious goal, a space habitat will need to be designed to accommodate a crew of four for the 380-day round trip. The Human Spaceflight Architecture Team (HAT) developed a conceptual design for such a habitat. The team identified activities that would be performed inside a long-duration, deep space habitat, and the capabilities needed to support such a mission. A list of seven functional activities/capabilities was developed: individual and group crew care, spacecraft and mission operations, subsystem equipment, logistics and resupply, and contingency operations. The volume for each activity was determined using NASA STD-3001 and the companion Human Integration Design Handbook (HIDH). Although, the sum of these volumes produced an over-sized spacecraft, the team evaluated activity frequency and duration to identify functions that could share a common volume without conflict, reducing the total volume by 24%. After adding 10% for growth, the resulting functional pressurized volume was calculated to be 268 m3 distributed over the functions. The work was validated through comparison with the International Space Station (ISS), Bigelow Aerospace s proposed habitat module, and NASA s Trans-Hab concepts. In the end, the team developed an internal layout that (a) minimized the transit time between related crew stations, (b) accommodated expected levels of activity at each station, (c) isolated stations when necessary for health, safety, performance, and privacy, and (d) provided a safe, efficient, and comfortable work and living environment.

  15. NASA Planetary Science Summer School: Preparing the Next Generation of Planetary Mission Leaders

    NASA Astrophysics Data System (ADS)

    Lowes, L. L.; Budney, C. J.; Sohus, A.; Wheeler, T.; Urban, A.; NASA Planetary Science Summer School Team

    2011-12-01

    Sponsored by NASA's Planetary Science Division, and managed by the Jet Propulsion Laboratory, the Planetary Science Summer School prepares the next generation of engineers and scientists to participate in future solar system exploration missions. Participants learn the mission life cycle, roles of scientists and engineers in a mission environment, mission design interconnectedness and trade-offs, and the importance of teamwork. For this professional development opportunity, applicants are sought who have a strong interest and experience in careers in planetary exploration, and who are science and engineering post-docs, recent PhDs, and doctoral students, and faculty teaching such students. Disciplines include planetary science, geoscience, geophysics, environmental science, aerospace engineering, mechanical engineering, and materials science. Participants are selected through a competitive review process, with selections based on the strength of the application and advisor's recommendation letter. Under the mentorship of a lead engineer (Dr. Charles Budney), students select, design, and develop a mission concept in response to the NASA New Frontiers Announcement of Opportunity. They develop their mission in the JPL Advanced Projects Design Team (Team X) environment, which is a cross-functional multidisciplinary team of professional engineers that utilizes concurrent engineering methodologies to complete rapid design, analysis and evaluation of mission concept designs. About 36 students participate each year, divided into two summer sessions. In advance of an intensive week-long session in the Project Design Center at JPL, students select the mission and science goals during a series of six weekly WebEx/telecons, and develop a preliminary suite of instrumentation and a science traceability matrix. Students assume both a science team and a mission development role with JPL Team X mentors. Once at JPL, students participate in a series of Team X project design sessions

  16. NASA Planetary Science Summer School: Preparing the Next Generation of Planetary Mission Leaders

    NASA Astrophysics Data System (ADS)

    Budney, C. J.; Lowes, L. L.; Sohus, A.; Wheeler, T.; Wessen, A.; Scalice, D.

    2010-12-01

    Sponsored by NASA’s Planetary Science Division, and managed by the Jet Propulsion Laboratory, the Planetary Science Summer School prepares the next generation of engineers and scientists to participate in future solar system exploration missions. Participants learn the mission life cycle, roles of scientists and engineers in a mission environment, mission design interconnectedness and trade-offs, and the importance of teamwork. For this professional development opportunity, applicants are sought who have a strong interest and experience in careers in planetary exploration, and who are science and engineering post-docs, recent PhDs, and doctoral students, and faculty teaching such students. Disciplines include planetary science, geoscience, geophysics, environmental science, aerospace engineering, mechanical engineering, and materials science. Participants are selected through a competitive review process, with selections based on the strength of the application and advisor’s recommendation letter. Under the mentorship of a lead engineer (Dr. Charles Budney), students select, design, and develop a mission concept in response to the NASA New Frontiers Announcement of Opportunity. They develop their mission in the JPL Advanced Projects Design Team (Team X) environment, which is a cross-functional multidisciplinary team of professional engineers that utilizes concurrent engineering methodologies to complete rapid design, analysis and evaluation of mission concept designs. About 36 students participate each year, divided into two summer sessions. In advance of an intensive week-long session in the Project Design Center at JPL, students select the mission and science goals during a series of six weekly WebEx/telecons, and develop a preliminary suite of instrumentation and a science traceability matrix. Students assume both a science team and a mission development role with JPL Team X mentors. Once at JPL, students participate in a series of Team X project design

  17. The Europa Clipper mission concept

    NASA Astrophysics Data System (ADS)

    Pappalardo, Robert; Lopes, Rosaly

    Jupiter's moon Europa may be a habitable world. Galileo spacecraft data suggest that an ocean most likely exists beneath Europa’s icy surface and that the “ingredients” necessary for life (liquid water, chemistry, and energy) could be present within this ocean today. Because of the potential for revolutionizing our understanding of life in the solar system, future exploration of Europa has been deemed an extremely high priority for planetary science. A NASA-appointed Science Definition Team (SDT), working closely with a technical team from the Jet Propulsion Laboratory (JPL) and the Applied Physics Laboratory (APL), recently considered options for a future strategic mission to Europa, with the stated science goal: Explore Europa to investigate its habitability. The group considered several mission options, which were fully technically developed, then costed and reviewed by technical review boards and planetary science community groups. There was strong convergence on a favored architecture consisting of a spacecraft in Jupiter orbit making many close flybys of Europa, concentrating on remote sensing to explore the moon. Innovative mission design would use gravitational perturbations of the spacecraft trajectory to permit flybys at a wide variety of latitudes and longitudes, enabling globally distributed regional coverage of the moon’s surface, with nominally 45 close flybys at altitudes from 25 to 100 km. We will present the science and reconnaissance goals and objectives, a mission design overview, and the notional spacecraft for this concept, which has become known as the Europa Clipper. The Europa Clipper concept provides a cost-efficient means to explore Europa and investigate its habitability, through understanding the satellite’s ice and ocean, composition, and geology. The set of investigations derived from these science objectives traces to a notional payload for science, consisting of: Ice Penetrating Radar (for sounding of ice-water interfaces

  18. Mission, Vision, Values, and Goals: An Exploration of Key Organizational Statements and Daily Practice in Schools

    ERIC Educational Resources Information Center

    Gurley, D. Keith; Peters, Gary B.; Collins, Loucrecia; Fifolt, Matthew

    2015-01-01

    This article reports findings from a study of graduate level, educational leadership students' familiarity with shared mission, vision, values, and goals statements and the perceived impact these concepts have on their practice as leaders and teachers in schools. The study is primarily qualitative and uses content analysis of responses to…

  19. Improving Care Teams' Functioning: Recommendations from Team Science.

    PubMed

    Fiscella, Kevin; Mauksch, Larry; Bodenheimer, Thomas; Salas, Eduardo

    2017-07-01

    Team science has been applied to many sectors including health care. Yet there has been relatively little attention paid to the application of team science to developing and sustaining primary care teams. Application of team science to primary care requires adaptation of core team elements to different types of primary care teams. Six elements of teams are particularly relevant to primary care: practice conditions that support or hinder effective teamwork; team cognition, including shared understanding of team goals, roles, and how members will work together as a team; leadership and coaching, including mutual feedback among members that promotes teamwork and moves the team closer to achieving its goals; cooperation supported by an emotionally safe climate that supports expression and resolution of conflict and builds team trust and cohesion; coordination, including adoption of processes that optimize efficient performance of interdependent activities among team members; and communication, particularly regular, recursive team cycles involving planning, action, and debriefing. These six core elements are adapted to three prototypical primary care teams: teamlets, health coaching, and complex care coordination. Implementation of effective team-based models in primary care requires adaptation of core team science elements coupled with relevant, practical training and organizational support, including adequate time to train, plan, and debrief. Training should be based on assessment of needs and tasks and the use of simulations and feedback, and it should extend to live action. Teamlets represent a potential launch point for team development and diffusion of teamwork principles within primary care practices. Copyright © 2017 The Joint Commission. Published by Elsevier Inc. All rights reserved.

  20. Application of State Analysis and Goal-based Operations to a MER Mission Scenario

    NASA Technical Reports Server (NTRS)

    Morris, John Richard; Ingham, Michel D.; Mishkin, Andrew H.; Rasmussen, Robert D.; Starbird, Thomas W.

    2006-01-01

    State Analysis is a model-based systems engineering methodology employing a rigorous discovery process which articulates operations concepts and operability needs as an integrated part of system design. The process produces requirements on system and software design in the form of explicit models which describe the system behavior in terms of state variables and the relationships among them. By applying State Analysis to an actual MER flight mission scenario, this study addresses the specific real world challenges of complex space operations and explores technologies that can be brought to bear on future missions. The paper first describes the tools currently used on a daily basis for MER operations planning and provides an in-depth description of the planning process, in the context of a Martian day's worth of rover engineering activities, resource modeling, flight rules, science observations, and more. It then describes how State Analysis allows for the specification of a corresponding goal-based sequence that accomplishes the same objectives, with several important additional benefits.

  1. Application of State Analysis and Goal-Based Operations to a MER Mission Scenario

    NASA Technical Reports Server (NTRS)

    Morris, J. Richard; Ingham, Michel D.; Mishkin, Andrew H.; Rasmussen, Robert D.; Starbird, Thomas W.

    2006-01-01

    State Analysis is a model-based systems engineering methodology employing a rigorous discovery process which articulates operations concepts and operability needs as an integrated part of system design. The process produces requirements on system and software design in the form of explicit models which describe the behavior of states and the relationships among them. By applying State Analysis to an actual MER flight mission scenario, this study addresses the specific real world challenges of complex space operations and explores technologies that can be brought to bear on future missions. The paper describes the tools currently used on a daily basis for MER operations planning and provides an in-depth description of the planning process, in the context of a Martian day's worth of rover engineering activities, resource modeling, flight rules, science observations, and more. It then describes how State Analysis allows for the specification of a corresponding goal-based sequence that accomplishes the same objectives, with several important additional benefits.

  2. A Distributed Simulation Software System for Multi-Spacecraft Missions

    NASA Technical Reports Server (NTRS)

    Burns, Richard; Davis, George; Cary, Everett

    2003-01-01

    The paper will provide an overview of the web-based distributed simulation software system developed for end-to-end, multi-spacecraft mission design, analysis, and test at the NASA Goddard Space Flight Center (GSFC). This software system was developed for an internal research and development (IR&D) activity at GSFC called the Distributed Space Systems (DSS) Distributed Synthesis Environment (DSE). The long-term goal of the DSS-DSE is to integrate existing GSFC stand-alone test beds, models, and simulation systems to create a "hands on", end-to-end simulation environment for mission design, trade studies and simulations. The short-term goal of the DSE was therefore to develop the system architecture, and then to prototype the core software simulation capability based on a distributed computing approach, with demonstrations of some key capabilities by the end of Fiscal Year 2002 (FY02). To achieve the DSS-DSE IR&D objective, the team adopted a reference model and mission upon which FY02 capabilities were developed. The software was prototyped according to the reference model, and demonstrations were conducted for the reference mission to validate interfaces, concepts, etc. The reference model, illustrated in Fig. 1, included both space and ground elements, with functional capabilities such as spacecraft dynamics and control, science data collection, space-to-space and space-to-ground communications, mission operations, science operations, and data processing, archival and distribution addressed.

  3. Strategic planning for employee happiness: a business goal for human service organizations.

    PubMed

    Howard, B; Gould, K E

    2000-09-01

    Employee happiness can impact substantially on an organization's performance. It can influence employee retention, absenteeism, and work performance. Because of this importance, such happiness is inseparable from the real business of the organization and should be considered a business goal. Implementation and development of the strategic plan associated with this goal becomes the responsibility of a highly placed project team that has as its mission ensuring employee satisfaction. The strategic plan includes procedures that allow management to listen effectively to employees, assessing and responding to their values and needs. In this paper we discuss the workforce and environmental characteristics that are involved planning for employee happiness and the steps in creating an organizational culture in which this can become a business goal.

  4. Global Precipitation Measurement (GPM) Mission

    NASA Image and Video Library

    2014-02-22

    A daruma doll is seen amongst the NASA GPM Mission launch team in the Spacecraft Test and Assembly Building 2 (STA2) during the all-day launch simulation for the Global Precipitation Measurement (GPM) Core Observatory, Saturday, Feb. 22, 2014, Tanegashima Space Center (TNSC), Tanegashima Island, Japan. One eye of the daruma doll is colored in when a goal is set, in this case a successful launch of GPM, and the second eye is colored in at the completion of the goal. Japan Aerospace Exploration Agency (JAXA) plans to launch an H-IIA rocket carrying the GPM Core Observatory on Feb. 28, 2014. The NASA-JAXA GPM spacecraft will collect information that unifies data from an international network of existing and future satellites to map global rainfall and snowfall every three hours. Photo Credit: (NASA/Bill Ingalls)

  5. Fourth Report of the Task Force on the Shuttle-Mir Rendezvous and Docking Missions

    NASA Technical Reports Server (NTRS)

    1995-01-01

    On December 6, 1994, the NASA Administrator, Mr. Daniel Goldin, requested that Lt. Gen. Thomas P. Stafford, in his role as the Chairman of the NASA Advisory Council Task Force on the Shuttle-Mir Rendezvous and Docking Missions, lead a team composed of several Task Force members and technical advisors' to Russia with the goal of reviewing preparations and readiness for the upcoming international Space Station Phase 1 missions. In his directions to Gen. Stafford, Mr. Goldin requested that the review team focus its initial efforts on safety of flight issues for the following Phase 1A missions: the Soyuz TM-21 mission which will carry U.S. astronaut Dr. Norman Thagard and cosmonauts Lt. Col. Vladimir Dezhurov and Mr. Gennady Strekalov aboard a Soyuz spacecraft to the Mir Station; the Mir 18 Main Expedition during which Thagard and his fellow cosmonauts, Dezhurov and Strokalov, will spend approximately three months aboard the Mir Station; the STS-71 Space Shuttle mission which will perform the first Shuttle-Mir docking, carry cosmonauts Col. Anatoly SoloViev and Mr. Nikolai Budarin to the Mir Station, and return Thagard, Dezhurov, and Strekalov to Earth.

  6. Ikhana: Unmanned Aircraft System Western States Fire Missions. Monographs in Aerospace History, Number 44

    NASA Technical Reports Server (NTRS)

    Merlin, Peter W.

    2009-01-01

    In 2006, NASA Dryden Flight Research Center, Edwards, Calif., obtained a civil version of the General Atomics MQ-9 unmanned aircraft system and modified it for research purposes. Proposed missions included support of Earth science research, development of advanced aeronautical technology, and improving the utility of unmanned aerial systems in general. The project team named the aircraft Ikhana a Native American Choctaw word meaning intelligent, conscious, or aware in order to best represent NASA research goals. Building on experience with these and other unmanned aircraft, NASA scientists developed plans to use the Ikhana for a series of missions to map wildfires in the western United States and supply the resulting data to firefighters in near-real time. A team at NASA Ames Research Center, Mountain View, Calif., developed a multispectral scanner that was key to the success of what became known as the Western States Fire Missions. Carried out by team members from NASA, the U.S. Department of Agriculture Forest Service, National Interagency Fire Center, National Oceanic and Atmospheric Administration, Federal Aviation Administration, and General Atomics Aeronautical Systems Inc., these flights represented an historic achievement in the field of unmanned aircraft technology.

  7. A Mission Control Architecture for robotic lunar sample return as field tested in an analogue deployment to the sudbury impact structure

    NASA Astrophysics Data System (ADS)

    Moores, John E.; Francis, Raymond; Mader, Marianne; Osinski, G. R.; Barfoot, T.; Barry, N.; Basic, G.; Battler, M.; Beauchamp, M.; Blain, S.; Bondy, M.; Capitan, R.-D.; Chanou, A.; Clayton, J.; Cloutis, E.; Daly, M.; Dickinson, C.; Dong, H.; Flemming, R.; Furgale, P.; Gammel, J.; Gharfoor, N.; Hussein, M.; Grieve, R.; Henrys, H.; Jaziobedski, P.; Lambert, A.; Leung, K.; Marion, C.; McCullough, E.; McManus, C.; Neish, C. D.; Ng, H. K.; Ozaruk, A.; Pickersgill, A.; Preston, L. J.; Redman, D.; Sapers, H.; Shankar, B.; Singleton, A.; Souders, K.; Stenning, B.; Stooke, P.; Sylvester, P.; Tornabene, L.

    2012-12-01

    A Mission Control Architecture is presented for a Robotic Lunar Sample Return Mission which builds upon the experience of the landed missions of the NASA Mars Exploration Program. This architecture consists of four separate processes working in parallel at Mission Control and achieving buy-in for plans sequentially instead of simultaneously from all members of the team. These four processes were: science processing, science interpretation, planning and mission evaluation. science processing was responsible for creating products from data downlinked from the field and is organized by instrument. Science Interpretation was responsible for determining whether or not science goals are being met and what measurements need to be taken to satisfy these goals. The Planning process, responsible for scheduling and sequencing observations, and the Evaluation process that fostered inter-process communications, reporting and documentation assisted these processes. This organization is advantageous for its flexibility as shown by the ability of the structure to produce plans for the rover every two hours, for the rapidity with which Mission Control team members may be trained and for the relatively small size of each individual team. This architecture was tested in an analogue mission to the Sudbury impact structure from June 6-17, 2011. A rover was used which was capable of developing a network of locations that could be revisited using a teach and repeat method. This allowed the science team to process several different outcrops in parallel, downselecting at each stage to ensure that the samples selected for caching were the most representative of the site. Over the course of 10 days, 18 rock samples were collected from 5 different outcrops, 182 individual field activities - such as roving or acquiring an image mosaic or other data product - were completed within 43 command cycles, and the rover travelled over 2200 m. Data transfer from communications passes were filled to 74

  8. The InSight Mission's Martian Atmospheric Science Goals, Capabilities and Instrumentation

    NASA Astrophysics Data System (ADS)

    Smrekar, S. E.; Banfield, D. J.

    2015-12-01

    The InSight Mission to Mars will launch in March 2016 and land in September 2016, beginning at least 1 Mars year of observations from the surface of Mars. The primary scientific goal of the InSight mission is to characterize the interior of Mars (both deep and near-surface), but it is also equipped with very capable meteorological instrumentation, and consequently has atmospheric science goals as well. The instrumentation InSight carries includes a very sensitive and fast response pressure sensor, as well as a pair of wind and temperature sensors that are similar to those flown on MSL and will be on Mars2020. These sensors will operate essentially continuously at Mars, a first; enabling the production of a complete sampling of the Martian environment, including short-lived transients. InSight also carries cameras that can be used to survey not only the ground in the near environment, but also sky conditions. The pressure sensor responds to signals below 10Hz (~10X its predecessors) and has a noise level of about 10 mPa (better than 1/10 its predecessors). The pair of wind and temperature sensors have been carefully placed opposite one another on the deck to minimize lander interference as much as possible, leaving one sensor on the windward side of the lander at any time. These capabilities, combined with their continuous sampling enable us to pursue new atmospheric science questions at Mars, including quantifying thresholds for aeolian change, detailed dust devil characterization, bolide infrasonic detection and characterization, and quantifying secular trends in pressure. This is in addition to characterizing the normal meteorology at the InSight landing site, which while not completely new, will provide incremental and important constraints for Martian Atmospheric models. We also expect there to be unexpected discoveries, as well as more synergistic approaches to coordination among all the instruments on InSight that may result even more novel capabilities.

  9. Group dynamics training for manned spaceflight and the capsuls mission: Prophylactic against incompatibility and its consequences?

    NASA Astrophysics Data System (ADS)

    Kass, R.; Kass, J.

    On February 7, 1994, four Canadian Astronauts were sealed off in a hyperbaric chamber at the Canadian Government's Defense and Civil Institute for Environmental Medicine in Toronto, Canada. This space lab training mission lasted seven days and was the first to be conducted with astronauts outside of Russia. The objective of this mission was to give Canadian astronauts, space scientists and the staff of the Canadian Space Agency (CSA), the opportunity to gain first hand experience on preparational and operational aspects of a typical space mission. Twenty-one scientific experiments involving six countries from several disciplines were involved in this mission. This paper describes the goals and preliminary results of a psychological experiment/training program that used the CAPSULS mission as a test bed for its application in the manned space flight environment. The objective of this project was to enhance the understanding of small group behaviour with a view to maximizing team effectiveness and task accomplishment in teams living and working in isolation under difficult and confined conditions. The application of this model in the light of future missions is a key thesis in this paper.

  10. Factors Impacting Habitable Volume Requirements for Long Duration Missions

    NASA Technical Reports Server (NTRS)

    Simon, Matthew; Neubek, Deborah; Whitmire, Alexandria

    2012-01-01

    One possible next leap in human space exploration for the National Aeronautics and Space Administration (NASA) is a mission to a near Earth asteroid (NEA). In order to achieve such an ambitious goal, a space habitat will need to accommodate a crew of four for the 380-day round trip. The Human Spaceflight Architecture Team (HAT) developed a conceptual design for such a habitat. The team identified activities that would be performed inside a long-duration, deep space habitat, and the capabilities needed to support such a mission. A list of seven functional activities/capabilities was developed: individual and group crew care, spacecraft and mission operations, subsystem equipment, logistics and resupply, and contingency operations. The volume for each activity was determined using NASA STD-3001 and the companion Human Integration Design Handbook (HIDH). Although, the sum of these volumes produced an over-sized spacecraft, the team evaluated activity frequency and duration to identify functions that could share a common volume without conflict, reducing the total volume by 24%. After adding 10% for growth, the resulting functional pressurized volume was calculated to be a minimum of 268 m3 (9,464 ft3) distributed over the functions. The work was validated through comparison to Mir, Skylab, the International Space Station (ISS), Bigelow Aerospace s proposed habitat module, and NASA s Trans-Hab concept. Using HIDH guidelines, the team developed an internal layout that (a) minimized the transit time between related crew stations, (b) accommodated expected levels of activity at each station, (c) isolated stations when necessary for health, safety, performance, and privacy, and (d) provided a safe, efficient, and comfortable work and living environment.

  11. Developing a Habitat for Long Duration, Deep Space Missions

    NASA Technical Reports Server (NTRS)

    Rucker, Michelle A.; Thompson, Shelby

    2012-01-01

    One possible next leap in human space exploration for the National Aeronautics and Space Administration (NASA) is a mission to a near Earth asteroid (NEA). In order to achieve such an ambitious goal, a space habitat will need to accommodate a crew of four for the 380-day round trip. The Human Spaceflight Architecture Team (HAT) developed a conceptual design for such a habitat. The team identified activities that would be performed inside a long-duration, deep space habitat, and the capabilities needed to support such a mission. A list of seven functional activities/capabilities was developed: individual and group crew care, spacecraft and mission operations, subsystem equipment, logistics and resupply, and contingency operations. The volume for each activity was determined using NASA STD-3001 and the companion Human Integration Design Handbook (HIDH). Although, the sum of these volumes produced an over-sized spacecraft, the team evaluated activity frequency and duration to identify functions that could share a common volume without conflict, reducing the total volume by 24%. After adding 10% for growth, the resulting functional pressurized volume was calculated to be a minimum of 268 cu m (9,464 cu ft) distributed over the functions. The work was validated through comparison to Mir, Skylab, the International Space Station (ISS), Bigelow Aerospace s proposed habitat module, and NASA s Trans-Hab concept. Using HIDH guidelines, the team developed an internal layout that (a) minimized the transit time between related crew stations, (b) accommodated expected levels of activity at each station, (c) isolated stations when necessary for health, safety, performance, and privacy, and (d) provided a safe, efficient, and comfortable work and living environment.

  12. Imagery Integration Team

    NASA Technical Reports Server (NTRS)

    Calhoun, Tracy; Melendrez, Dave

    2014-01-01

    The Human Exploration Science Office (KX) provides leadership for NASA's Imagery Integration (Integration 2) Team, an affiliation of experts in the use of engineering-class imagery intended to monitor the performance of launch vehicles and crewed spacecraft in flight. Typical engineering imagery assessments include studying and characterizing the liftoff and ascent debris environments; launch vehicle and propulsion element performance; in-flight activities; and entry, landing, and recovery operations. Integration 2 support has been provided not only for U.S. Government spaceflight (e.g., Space Shuttle, Ares I-X) but also for commercial launch providers, such as Space Exploration Technologies Corporation (SpaceX) and Orbital Sciences Corporation, servicing the International Space Station. The NASA Integration 2 Team is composed of imagery integration specialists from JSC, the Marshall Space Flight Center (MSFC), and the Kennedy Space Center (KSC), who have access to a vast pool of experience and capabilities related to program integration, deployment and management of imagery assets, imagery data management, and photogrammetric analysis. The Integration 2 team is currently providing integration services to commercial demonstration flights, Exploration Flight Test-1 (EFT-1), and the Space Launch System (SLS)-based Exploration Missions (EM)-1 and EM-2. EM-2 will be the first attempt to fly a piloted mission with the Orion spacecraft. The Integration 2 Team provides the customer (both commercial and Government) with access to a wide array of imagery options - ground-based, airborne, seaborne, or vehicle-based - that are available through the Government and commercial vendors. The team guides the customer in assembling the appropriate complement of imagery acquisition assets at the customer's facilities, minimizing costs associated with market research and the risk of purchasing inadequate assets. The NASA Integration 2 capability simplifies the process of securing one

  13. STS-105 Flight Control Team Photo

    NASA Image and Video Library

    2001-07-31

    JSC2001-02115 (31 July 2001) --- The flight controllers for the Ascent/Entry shift for the upcoming STS-105 mission pose with the assigned astronaut crew for a team portrait in the Shuttle Flight Control Room (WFCR) of Houston's Mission Control Center (MCC). Flight director John Shannon (left center) and STS-105 commander Scott J. Horowitz hold the mission logo. Also pictured on the front row are spacecraft communicator Kenneth D. Cockrell and STS-105 crew members Daniel T. Barry, Frederick W. (Rick) Sturckow and Patrick G. Forrester. The team had been participating in an integrated simulation for the scheduled August mission.

  14. Measuring patterns in team interaction sequences using a discrete recurrence approach.

    PubMed

    Gorman, Jamie C; Cooke, Nancy J; Amazeen, Polemnia G; Fouse, Shannon

    2012-08-01

    Recurrence-based measures of communication determinism and pattern information are described and validated using previously collected team interaction data. Team coordination dynamics has revealed that"mixing" team membership can lead to flexible interaction processes, but keeping a team "intact" can lead to rigid interaction processes. We hypothesized that communication of intact teams would have greater determinism and higher pattern information compared to that of mixed teams. Determinism and pattern information were measured from three-person Uninhabited Air Vehicle team communication sequences over a series of 40-minute missions. Because team members communicated using push-to-talk buttons, communication sequences were automatically generated during each mission. The Composition x Mission determinism effect was significant. Intact teams' determinism increased over missions, whereas mixed teams' determinism did not change. Intact teams had significantly higher maximum pattern information than mixed teams. Results from these new communication analysis methods converge with content-based methods and support our hypotheses. Because they are not content based, and because they are automatic and fast, these new methods may be amenable to real-time communication pattern analysis.

  15. Spacelab Operations Support Room Space Engineering Support Team in the SL POCC During the IML-1

    NASA Technical Reports Server (NTRS)

    1992-01-01

    The primary payload for Space Shuttle Mission STS-42, launched January 22, 1992, was the International Microgravity Laboratory-1 (IML-1), a pressurized manned Spacelab module. The goal of IML-1 was to explore in depth the complex effects of weightlessness of living organisms and materials processing. Around-the-clock research was performed on the human nervous system's adaptation to low gravity and effects of microgravity on other life forms such as shrimp eggs, lentil seedlings, fruit fly eggs, and bacteria. Materials processing experiments were also conducted, including crystal growth from a variety of substances such as enzymes, mercury iodide, and a virus. The Huntsville Operations Support Center (HOSC) Spacelab Payload Operations Control Center (SL POCC) at the Marshall Space Flight Center (MSFC) was the air/ground communication channel used between the astronauts and ground control teams during the Spacelab missions. Featured is the Spacelab Operations Support Room Space Engineering Support team in the SL POCC during STS-42, IML-1 mission.

  16. Crystal Growth Team in the Spacelab Payload Operations Control Center (SL POCC) During the STS-42

    NASA Technical Reports Server (NTRS)

    1992-01-01

    The primary payload for Space Shuttle Mission STS-42, launched January 22, 1992, was the International Microgravity Laboratory-1 (IML-1), a pressurized manned Spacelab module. The goal of IML-1 was to explore in depth the complex effects of weightlessness of living organisms and materials processing. Around-the-clock research was performed on the human nervous system's adaptation to low gravity and effects of microgravity on other life forms such as shrimp eggs, lentil seedlings, fruit fly eggs, and bacteria. Materials processing experiments were also conducted, including crystal growth from a variety of substances such as enzymes, mercury iodide, and a virus. The Huntsville Operations Support Center (HOSC) Spacelab Payload Operations Control Center (SL POCC) at the Marshall Space Flight Center (MSFC) was the air/ground communication channel used between the astronauts and ground control teams during the Spacelab missions. Featured is the Crystal Growth team in the SL POCC during STS-42, IML-1 mission.

  17. Accessing Information on the Mars Exploration Rovers Mission

    NASA Astrophysics Data System (ADS)

    Walton, J. D.; Schreiner, J. A.

    2005-12-01

    In January 2004, the Mars Exploration Rovers (MER) mission successfully deployed two robotic geologists - Spirit and Opportunity - to opposite sides of the red planet. Onboard each rover is an array of cameras and scientific instruments that send data back to Earth, where ground-based systems process and store the information. During the height of the mission, a team of about 250 scientists and engineers worked around the clock to analyze the collected data, determine a strategy and activities for the next day and then carefully compose the command sequences that would instruct the rovers in how to perform their tasks. The scientists and engineers had to work closely together to balance the science objectives with the engineering constraints so that the mission achieved its goals safely and quickly. To accomplish this coordinated effort, they adhered to a tightly orchestrated schedule of meetings and processes. To keep on time, it was critical that all team members were aware of what was happening, knew how much time they had to complete their tasks, and could easily access the information they need to do their jobs. Computer scientists and software engineers at NASA Ames Research Center worked closely with the mission managers at the Jet Propulsion Laboratory (JPL) to create applications that support the mission. One such application, the Collaborative Information Portal (CIP), helps mission personnel perform their daily tasks, whether they work inside mission control or the science areas at JPL, or in their homes, schools, or offices. With a three-tiered, service-oriented architecture (SOA) - client, middleware, and data repository - built using Java and commercial software, CIP provides secure access to mission schedules and to data and images transmitted from the Mars rovers. This services-based approach proved highly effective for building distributed, flexible applications, and is forming the basis for the design of future mission software systems. Almost two

  18. SeaWiFS Technical Report Series. Volume 8: Proceedings of the First SeaWiFS Science Team Meeting

    NASA Technical Reports Server (NTRS)

    Hooker, Stanford B. (Editor); Esaias, Wayne E.; Rexrode, Lisa A.; Firestone, Elaine R. (Editor)

    1993-01-01

    The first meeting of the SeaWiFS Science Team was held in preparation for a launch of the SeaStar satellite carrying the SeaWiFS ocean color scanner in the October 1993 time frame. The primary goals of the meeting were: (1) to brief Science Team members, agency representatives, and international collaborators on the status of the mission by representatives from the SeaWiFS Project, the prime contractor Orbital Sciences Corporation (OSC), and the Goddard Distributed Active Archive Center (DAAC); (2) to provide for briefings on the science investigations undertaken by Science Team members and to solicit comments and recommendations from meeting attendees for improvements; and (3) to improve coordination of research and validation activities both inter- and intra-nationally with respect to collection, validation, and application of ocean color data from the SeaWiFS mission. Presentations and recommendations are summarized.

  19. Hypermedia and intelligent tutoring applications in a mission operations environment

    NASA Technical Reports Server (NTRS)

    Ames, Troy; Baker, Clifford

    1990-01-01

    Hypermedia, hypertext and Intelligent Tutoring System (ITS) applications to support all phases of mission operations are investigated. The application of hypermedia and ITS technology to improve system performance and safety in supervisory control is described - with an emphasis on modeling operator's intentions in the form of goals, plans, tasks, and actions. Review of hypermedia and ITS technology is presented as may be applied to the tutoring of command and control languages. Hypertext based ITS is developed to train flight operation teams and System Test and Operation Language (STOL). Specific hypermedia and ITS application areas are highlighted, including: computer aided instruction of flight operation teams (STOL ITS) and control center software development tools (CHIMES and STOL Certification Tool).

  20. Cassini End of Mission

    NASA Image and Video Library

    2017-09-15

    Spacecraft operations team manager for the Cassini mission at Saturn, Julie Webster, rips up the final contingency plan for the Cassini mission, Friday, Sept. 15, 2017 in mission control at NASA's Jet Propulsion Laboratory in Pasadena, California. Since its arrival in 2004, the Cassini-Huygens mission has been a discovery machine, revolutionizing our knowledge of the Saturn system and captivating us with data and images never before obtained with such detail and clarity. On Sept. 15, 2017, operators deliberately plunged the spacecraft into Saturn, as Cassini gathered science until the end. Loss of contact with the Cassini spacecraft occurred at 7:55 a.m. EDT (4:55 a.m. PDT). The “plunge” ensures Saturn’s moons will remain pristine for future exploration. During Cassini’s final days, mission team members from all around the world gathered at NASA’s Jet Propulsion Laboratory, Pasadena, California, to celebrate the achievements of this historic mission. Photo Credit: (NASA/Joel Kowsky)

  1. Progress Towards providing Heat-Shield for Extreme Entry Environment Technology (HEEET) for Venus and other New Froniters Missions

    NASA Technical Reports Server (NTRS)

    Venkatapathy, Ethiraj; Ellerby, Don; Gage, Peter

    2017-01-01

    Heat-shield for Extreme Entry Environment Technology (HEEET) has been in development since 2014 with the goal of enabling missions to Venus, Saturn and other high-speed sample return missions. It is offered as a new technology and incentivized for mission use in the New Frontiers 4 AO by NASA. The current plans are to mature the technology to TRL 6 by FY18. The HEEET Team has been working closely with multiple NF-4 proposals to Venus, Saturn and has been supporting recent Ice-Giants mission studies. This presentation will provide progress made to date and the plans for development in FY18.

  2. Team Expo: A State-of-the-Art JSC Advanced Design Team

    NASA Technical Reports Server (NTRS)

    Tripathi, Abhishek

    2001-01-01

    In concert with the NASA-wide Intelligent Synthesis Environment Program, the Exploration Office at the Johnson Space Center has assembled an Advanced Design Team. The purpose of this team is two-fold. The first is to identify, use, and develop software applications, tools, and design processes that streamline and enhance a collaborative engineering environment. The second is to use this collaborative engineering environment to produce conceptual, system-level-of-detail designs in a relatively short turnaround time, using a standing team of systems and integration experts. This includes running rapid trade studies on varying mission architectures, as well as producing vehicle and/or subsystem designs. The standing core team is made up of experts from all of the relevant engineering divisions (e.g. Power, Thermal, Structures, etc.) as well as representatives from Risk and Safety, Mission Operations, and Crew Life Sciences among others. The Team works together during 2- hour sessions in the same specially enhanced room to ensure real-time integration/identification of cross-disciplinary issues and solutions. All subsystem designs are collectively reviewed and approved during these same sessions. In addition there is an Information sub-team that captures and formats all data and makes it accessible for use by the following day. The result is Team Expo: an Advanced Design Team that is leading the change from a philosophy of "over the fence" design to one of collaborative engineering that pushes the envelope to achieve the next-generation analysis and design environment.

  3. The Academic Evolution of Teaming

    ERIC Educational Resources Information Center

    Hansen, Spencer D.

    2009-01-01

    Developing interdisciplinary teams that function properly should be the goal of every school leader who is interested in promoting middle level reform. To accomplish that goal, individual team members should not be left on their own to sink or swim with the teaming concept, but must be guided through a transformational process that teaches them to…

  4. NASA's Asteroid Redirect Mission (ARM)

    NASA Astrophysics Data System (ADS)

    Abell, Paul; Mazanek, Dan; Reeves, David; Naasz, Bo; Cichy, Benjamin

    2015-11-01

    The National Aeronautics and Space Administration (NASA) is developing a robotic mission to visit a large near-Earth asteroid (NEA), collect a multi-ton boulder from its surface, and redirect it into a stable orbit around the Moon. Once returned to cislunar space in the mid-2020s, astronauts will explore the boulder and return to Earth with samples. This Asteroid Redirect Mission (ARM) is part of NASA’s plan to advance the technologies, capabilities, and spaceflight experience needed for a human mission to the Martian system in the 2030s. Subsequent human and robotic missions to the asteroidal material would also be facilitated by its return to cislunar space. Although ARM is primarily a capability demonstration mission (i.e., technologies and associated operations), there exist significant opportunities to advance our knowledge of small bodies in the synergistic areas of science, planetary defense, asteroidal resources and in-situ resource utilization (ISRU), and capability and technology demonstrations. In order to maximize the knowledge return from the mission, NASA is organizing an ARM Investigation Team, which is being preceded by the Formulation Assessment and Support Team. These teams will be comprised of scientists, technologists, and other qualified and interested individuals to help plan the implementation and execution of ARM. An overview of robotic and crewed segments of ARM, including the mission requirements, NEA targets, and mission operations, will be provided along with a discussion of the potential opportunities associated with the mission.

  5. The Asteroid Redirect Mission (ARM)

    NASA Technical Reports Server (NTRS)

    Abell, Paul

    2015-01-01

    The National Aeronautics and Space Administration (NASA) is developing a robotic mission to visit a large near-Earth asteroid (NEA), collect a multi-ton boulder from its surface, and redirect it into a stable orbit around the Moon. Once returned to cislunar space in the mid-2020s, astronauts will explore the boulder and return to Earth with samples. This Asteroid Redirect Mission (ARM) is part of NASA's plan to advance the technologies, capabilities, and spaceflight experience needed for a human mission to the Martian system in the 2030s. Subsequent human and robotic missions to the asteroidal material would also be facilitated by its return to cislunar space. Although ARM is primarily a capability demonstration mission (i.e., technologies and associated operations), there exist significant opportunities to advance our knowledge of small bodies in the synergistic areas of science, planetary defense, asteroidal resources and in-situ resource utilization (ISRU), and capability and technology demonstrations. In order to maximize the knowledge return from the mission, NASA is organizing an ARM Investigation Team, which is being preceded by the Formulation Assessment and Support Team. These teams will be comprised of scientists, technologists, and other qualified and interested individuals to help plan the implementation and execution of ARM. An overview of robotic and crewed segments of ARM, including the mission requirements, NEA targets, and mission operations, will be provided along with a discussion of the potential opportunities associated with the mission.

  6. Quality Interaction Between Mission Assurance and Project Team Members

    NASA Technical Reports Server (NTRS)

    Kwong-Fu, Helenann H.; Wilson, Robert K.

    2006-01-01

    This viewgraph presentation demonstrates the importance of value added Mission Assurance to flight operations in order to assure mission success and the Health and Safety of the mission, (i.e., the Spitzer space Telescope.)

  7. The importance of team functioning to natural resource planning outcomes.

    PubMed

    Stern, Marc J; Predmore, S Andrew

    2012-09-15

    In its recent history, the U.S. Forest Service is among many federal land management agencies struggling with questions concerning why its planning procedures are sometimes inefficient, perform poorly in the eyes of the public, and fail to deliver outputs that advance agency mission. By examining a representative sample of National Environmental Policy Act (NEPA) processes conducted by the agency between 2007 and 2009, we provide new insights into what drives outcomes in these planning processes. We examined team leaders' perceptions of the following outcomes: achievement of agency goals and NEPA mandates, process efficiency, public relations, and team outcomes. The most consistently important predictors of positive outcomes were team harmony and a clearly empowered team leader. Other factors, such as perceptions of the use of best science, a clear and unambiguous purpose and need, team turnover (personnel changes during the process), extra-agency engagement, and intra-agency relations, were also important, but played a less consistent role. The findings suggest the importance of empowering team leaders and team members through enhancing elements of discretion, responsibility, clear role definition, collaborative interdisciplinary deliberation, and perceived self-efficacy. The results also suggest the importance of genuine concern and respect for participating publics and effective inter-agency coordination. Copyright © 2012 Elsevier Ltd. All rights reserved.

  8. Complex collaborative problem-solving processes in mission control.

    PubMed

    Fiore, Stephen M; Wiltshire, Travis J; Oglesby, James M; O'Keefe, William S; Salas, Eduardo

    2014-04-01

    NASA's Mission Control Center (MCC) is responsible for control of the International Space Station (ISS), which includes responding to problems that obstruct the functioning of the ISS and that may pose a threat to the health and well-being of the flight crew. These problems are often complex, requiring individuals, teams, and multiteam systems, to work collaboratively. Research is warranted to examine individual and collaborative problem-solving processes in this context. Specifically, focus is placed on how Mission Control personnel-each with their own skills and responsibilities-exchange information to gain a shared understanding of the problem. The Macrocognition in Teams Model describes the processes that individuals and teams undertake in order to solve problems and may be applicable to Mission Control teams. Semistructured interviews centering on a recent complex problem were conducted with seven MCC professionals. In order to assess collaborative problem-solving processes in MCC with those predicted by the Macrocognition in Teams Model, a coding scheme was developed to analyze the interview transcriptions. Findings are supported with excerpts from participant transcriptions and suggest that team knowledge-building processes accounted for approximately 50% of all coded data and are essential for successful collaborative problem solving in mission control. Support for the internalized and externalized team knowledge was also found (19% and 20%, respectively). The Macrocognition in Teams Model was shown to be a useful depiction of collaborative problem solving in mission control and further research with this as a guiding framework is warranted.

  9. Cassini End of Mission

    NASA Image and Video Library

    2017-09-14

    A jar of peanuts is seen sitting on a console in mission control of the Space Flight Operations Center as the Cassini mission team await the final downlink of the spacecraft's data recorder, Thursday, Sept. 14, 2017 at NASA's Jet Propulsion Laboratory in Pasadena, California. Since its arrival in 2004, the Cassini-Huygens mission has been a discovery machine, revolutionizing our knowledge of the Saturn system and captivating us with data and images never before obtained with such detail and clarity. On Sept. 15, 2017, operators will deliberately plunge the spacecraft into Saturn, as Cassini gathered science until the end. The “plunge” ensures Saturn’s moons will remain pristine for future exploration. During Cassini’s final days, mission team members from all around the world gathered at NASA’s Jet Propulsion Laboratory, Pasadena, California, to celebrate the achievements of this historic mission. Photo Credit: (NASA/Joel Kowsky)

  10. Cassini End of Mission

    NASA Image and Video Library

    2017-09-14

    Spacecraft operations team manager for the Cassini mission at Saturn, Julie Webster, watches monitors in mission control of the Space Flight Operations Center as the Cassini spacecraft begins downlink data through NASA's Deep Space Network, Thursday, Sept. 14, 2017 at NASA's Jet Propulsion Laboratory in Pasadena, California. Since its arrival in 2004, the Cassini-Huygens mission has been a discovery machine, revolutionizing our knowledge of the Saturn system and captivating us with data and images never before obtained with such detail and clarity. On Sept. 15, 2017, operators will deliberately plunge the spacecraft into Saturn, as Cassini gathered science until the end. The “plunge” ensures Saturn’s moons will remain pristine for future exploration. During Cassini’s final days, mission team members from all around the world gathered at NASA’s Jet Propulsion Laboratory, Pasadena, California, to celebrate the achievements of this historic mission. Photo Credit: (NASA/Joel Kowsky)

  11. Thermosphere-ionosphere-mesosphere energetics and dynamics (TIMED). The TIMED mission and science program report of the science definition team. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    1991-01-01

    A Science Definition Team was established in December 1990 by the Space Physics Division, NASA, to develop a satellite program to conduct research on the energetics, dynamics, and chemistry of the mesosphere and lower thermosphere/ionosphere. This two-volume publication describes the TIMED (Thermosphere-Ionosphere-Mesosphere, Energetics and Dynamics) mission and associated science program. The report outlines the scientific objectives of the mission, the program requirements, and the approach towards meeting these requirements.

  12. Setting goals, not just roles: Improving teamwork through goal-focused debriefing.

    PubMed

    Gardner, Aimee K; Kosemund, Matthew; Hogg, Deborah; Heymann, Abraham; Martinez, Joseph

    2017-02-01

    The role of goal setting within post-simulation debriefing is not well known. This study sought to examine how inclusion of group-level goals, individual-level goals, or no goals in the debriefing process impacts teamwork. Students participated in two high-fidelity team training scenarios. Between scenarios, teams were assigned to one of three debriefing groups: jointly creating five teamwork goals for the group to achieve (group-level goals); independently creating five teamwork goals for each individual to attain (individual-level goals); or no goals. Paired-samples t tests and one-way ANOVA with post-hoc Tukey tests were used to examine performance improvements and differences between groups. 86 MS3s participated in the training program across 22 groups. Percentage of items achieved on the teamwork tool from first to second scenario were 61.7±20.4 to 60.2±8.8 (no goals; ns), 59.8±14.0 to 76.8±7.0 (individual goals; p<0.01), and 62.5±9.5 to 67.0±10.0 (group goals; ns). Performance improvement in the individual goals group was significantly higher than the no goals group (p<0.05). Debriefing facilitators should encourage learners to focus on creating and achieving personal goals contributing to teamwork. Copyright © 2016 Elsevier Inc. All rights reserved.

  13. NASA's Gravitational-Wave Mission Concept Study

    NASA Technical Reports Server (NTRS)

    Stebbins, Robin

    2012-01-01

    With the conclusion of the NASA/ESA partnership on the Laser interferometer Space Antenna (LISA) Project, NASA initiated a study to explore mission concepts that will accomplish some or all of the LISA science objectives at lower cost. The Gravitational-Wave Mission Concept Study consists of a public Request for Information (RFI), a Core Team of NASA engineers and scientists, a Community Science Team, a Science Task Force, and an open workshop. The RFI yielded 12 mission concepts, 3 instrument concepts and 2 technologies. The responses ranged from concepts that eliminated the drag-free test mass of LISA to concepts that replace the test mass with an atom interferometer. The Core Team reviewed the noise budgets and sensitivity curves, the payload and spacecraft designs and requirements, orbits and trajectories and technical readiness and risk. The Science Task Force assessed the science performance. Three mission concepts have been studied by Team-X, JPL's concurrent design facility, to refine the conceptual design, evaluate key performance parameters, assess risk and estimate cost and schedule. The status of the Study are reported.

  14. Unobtrusive Monitoring of Spaceflight Team Functioning

    NASA Technical Reports Server (NTRS)

    Maidel, Veronica; Stanton, Jeffrey M.

    2010-01-01

    This document contains a literature review suggesting that research on industrial performance monitoring has limited value in assessing, understanding, and predicting team functioning in the context of space flight missions. The review indicates that a more relevant area of research explores the effectiveness of teams and how team effectiveness may be predicted through the elicitation of individual and team mental models. Note that the mental models referred to in this literature typically reflect a shared operational understanding of a mission setting such as the cockpit controls and navigational indicators on a flight deck. In principle, however, mental models also exist pertaining to the status of interpersonal relations on a team, collective beliefs about leadership, success in coordination, and other aspects of team behavior and cognition. Pursuing this idea, the second part of this document provides an overview of available off-the-shelf products that might assist in extraction of mental models and elicitation of emotions based on an analysis of communicative texts among mission personnel. The search for text analysis software or tools revealed no available tools to enable extraction of mental models automatically, relying only on collected communication text. Nonetheless, using existing software to analyze how a team is functioning may be relevant for selection or training, when human experts are immediately available to analyze and act on the findings. Alternatively, if output can be sent to the ground periodically and analyzed by experts on the ground, then these software packages might be employed during missions as well. A demonstration of two text analysis software applications is presented. Another possibility explored in this document is the option of collecting biometric and proxemic measures such as keystroke dynamics and interpersonal distance in order to expose various individual or dyadic states that may be indicators or predictors of certain

  15. (abstract) Mission Operations and Control Assurance: Flight Operations Quality Improvements

    NASA Technical Reports Server (NTRS)

    Welz, Linda L.; Bruno, Kristin J.; Kazz, Sheri L.; Witkowski, Mona M.

    1993-01-01

    Mission Operations and Command Assurance (MO&CA), a recent addition to flight operations teams at JPL. provides a system level function to instill quality in mission operations. MO&CA's primary goal at JPL is to help improve the operational reliability for projects during flight. MO&CA tasks include early detection and correction of process design and procedural deficiencies within projects. Early detection and correction are essential during development of operational procedures and training of operational teams. MO&CA's effort focuses directly on reducing the probability of radiating incorrect commands to a spacecraft. Over the last seven years at JPL, MO&CA has become a valuable asset to JPL flight projects. JPL flight projects have benefited significantly from MO&CA's efforts to contain risk and prevent rather than rework errors. MO&CA's ability to provide direct transfer of knowledge allows new projects to benefit directly from previous and ongoing experience. Since MO&CA, like Total Quality Management (TQM), focuses on continuous improvement of processes and elimination of rework, we recommend that this effort be continued on NASA flight projects.

  16. Cassini End of Mission

    NASA Image and Video Library

    2017-09-15

    Duane Roth, of Cassini's navigation team, left, speaks with director of NASA's Jet Propulsion Laboratory, Michael Watkins, right, after Cassini's mission was declared over, Friday, Sept. 15, 2017 in mission control at NASA's Jet Propulsion Laboratory in Pasadena, California. Since its arrival in 2004, the Cassini-Huygens mission has been a discovery machine, revolutionizing our knowledge of the Saturn system and captivating us with data and images never before obtained with such detail and clarity. On Sept. 15, 2017, operators deliberately plunged the spacecraft into Saturn, as Cassini gathered science until the end. Loss of contact with the Cassini spacecraft occurred at 7:55 a.m. EDT (4:55 a.m. PDT). The “plunge” ensures Saturn’s moons will remain pristine for future exploration. During Cassini’s final days, mission team members from all around the world gathered at NASA’s Jet Propulsion Laboratory, Pasadena, California, to celebrate the achievements of this historic mission. Photo Credit: (NASA/Joel Kowsky)

  17. Cassini End of Mission

    NASA Image and Video Library

    2017-09-15

    Spacecraft operations team manager for the Cassini mission at Saturn, Julie Webster is seen after the end of the Cassini mission, Friday, Sept. 15, 2017 at NASA's Jet Propulsion Laboratory in Pasadena, California. Since its arrival in 2004, the Cassini-Huygens mission has been a discovery machine, revolutionizing our knowledge of the Saturn system and captivating us with data and images never before obtained with such detail and clarity. On Sept. 15, 2017, operators deliberately plunged the spacecraft into Saturn, as Cassini gathered science until the end. Loss of contact with the Cassini spacecraft occurred at 7:55 a.m. EDT (4:55 a.m. PDT). The “plunge” ensures Saturn’s moons will remain pristine for future exploration. During Cassini’s final days, mission team members from all around the world gathered at NASA’s Jet Propulsion Laboratory, Pasadena, California, to celebrate the achievements of this historic mission. Photo Credit: (NASA/Joel Kowsky)

  18. Cassini End of Mission

    NASA Image and Video Library

    2017-09-15

    Spacecraft operations team manager for the Cassini mission at Saturn, Julie Webster is seen in mission control as the Cassini spacecraft makes its final plunge into Saturn, Friday, Sept. 15, 2017 at NASA's Jet Propulsion Laboratory in Pasadena, California. Since its arrival in 2004, the Cassini-Huygens mission has been a discovery machine, revolutionizing our knowledge of the Saturn system and captivating us with data and images never before obtained with such detail and clarity. On Sept. 15, 2017, operators deliberately plunged the spacecraft into Saturn, as Cassini gathered science until the end. Loss of contact with the Cassini spacecraft occurred at 7:55 a.m. EDT (4:55 a.m. PDT). The “plunge” ensures Saturn’s moons will remain pristine for future exploration. During Cassini’s final days, mission team members from all around the world gathered at NASA’s Jet Propulsion Laboratory, Pasadena, California, to celebrate the achievements of this historic mission. Photo Credit: (NASA/Joel Kowsky)

  19. Resource Prospector: Mission Goals, Relevance and Site Selection

    NASA Technical Reports Server (NTRS)

    Colaprete, A.; Elphic, R. C.; Andrews, D.; Sanders, G.; McGovern, A.; Vaughan, R.; Heldmann, J.; Trimble, J.

    2015-01-01

    Over the last two decades a wealth of new observations of the moon have demonstrated a lunar water system dramatically more complex and rich than was deduced following the Apollo era. Observation from the Lunar Prospector Neutron Spectrometer (LPNS) revealed enhancements of hydrogen near the lunar poles. This observation has since been confirmed by the Lunar Reconnaissance Orbiter (LRO) Lunar Exploration Neutron Detector (LEND) instrument. The Lunar Crater Observation and Sensing Satellite (LCROSS) mission targeted a permanently shadowed, enhanced hydrogen location within the crater Cabeus. The LCROSS impact showed that at least some of the hydrogen enhancement is in the form of water ice and molecular hydrogen (H2). Other volatiles were also observed in the LCROSS impact cloud, including CO2, CO, an H2S. These volatiles, and in particular water, have the potential to be a valuable or enabling resource for future exploration. In large part due to these new findings, the NASA Human Exploration and Operations Mission Directorate (HEOMD) have selected a lunar volatiles prospecting mission for a concept study and potential flight in CY2020. The mission includes a rover-borne payload that (1) can locate surface and near-subsurface volatiles, (2) excavate and analyze samples of the volatile-bearing regolith (up to 1 meter), and (3) demonstrate the form, extractability and usefulness of the materials.

  20. A preliminary study of Mars rover/sample return missions

    NASA Technical Reports Server (NTRS)

    1987-01-01

    The Solar System Exploration Committee (SSEC) of the NASA Advisory Council recommends that a Mars Sample Return mission be undertaken before the year 2000. Comprehensive studies of a Mars Sample Return mission have been ongoing since 1984. The initial focus of these studies was an integrated mission concept with the surface rover and sample return vehicle elements delivered to Mars on a single launch and landed together. This approach, to be carried out as a unilateral U.S. initiative, is still a high priority goal in an Augmented Program of exploration, as the SSEC recommendation clearly states. With this background of a well-understood mission concept, NASA decided to focus its 1986 study effort on a potential opportunity not previously examined; namely, a Mars Rover/Sample Return (MRSR) mission which would involve a significant aspect of international cooperation. As envisioned, responsibility for the various mission operations and hardware elements would be divided in a logical manner with clearly defined and acceptable interfaces. The U.S. and its international partner would carry out separately launched but coordinated missions with the overall goal of accomplishing in situ science and returning several kilograms of surface samples from Mars. Important considerations for implementation of such a plan are minimum technology transfer, maximum sharing of scientific results, and independent credibility of each mission role. Under the guidance and oversight of a Mars Exploration Strategy Advisory Group organized by NASA, a study team was formed in the fall of 1986 to develop a preliminary definition of a flight-separable, cooperative mission. The selected concept assumes that the U.S. would undertake the rover mission with its sample collection operations and our international partner would return the samples to Earth. Although the inverse of these roles is also possible, this study report focuses on the rover functions of MRSR because rover operations have not

  1. Diagnosing and improving functioning in interdisciplinary health care teams.

    PubMed

    Blackmore, Gail; Persaud, D David

    2012-01-01

    Interdisciplinary teams play a key role in the delivery of health care. Team functioning can positively or negatively impact the effective and efficient delivery of health care services as well as the personal well-being of group members. Additionally, teams must be able and willing to work together to achieve team goals within a climate that reflects commitment to team goals, accountability, respect, and trust. Not surprisingly, dysfunctional team functioning can limit the success of interdisciplinary health care teams. The first step in improving dysfunctional team function is to conduct an analysis based on criteria necessary for team success, and this article provides meaningful criteria for doing such an analysis. These are the following: a common team goal, the ability and willingness to work together to achieve team goals, decision making, communication, and team member relationships. High-functioning interdisciplinary teams must exhibit features of good team function in all key domains. If a team functions well in some domains and needs to improve in others, targeted strategies are described that can be used to improve team functioning.

  2. Business analysis: The commercial mission of the International Asteroid Mission

    NASA Astrophysics Data System (ADS)

    The mission of the International Asteroid Mission (IAM) is providing asteroidal resources to support activities in space. The short term goal is to initiate IAM by mining a near-Earth, hydrous carbonaceous chondrite asteroid to service the nearer-term market of providing cryogenic rocket fuel in low lunar orbit (LLO). The IAM will develop and contract for the building of the transportation vehicles and equipment necessary for this undertaking. The long-term goal is to expand operations by exploiting asteroids in other manners, as these options become commercially viable. The primary business issues are what revenue can be generated from the baseline mission, how much will the mission cost, and how funding for this mission can be raised. These issues are addressed.

  3. Low Cost Missions Operations on NASA Deep Space Missions

    NASA Astrophysics Data System (ADS)

    Barnes, R. J.; Kusnierkiewicz, D. J.; Bowman, A.; Harvey, R.; Ossing, D.; Eichstedt, J.

    2014-12-01

    The ability to lower mission operations costs on any long duration mission depends on a number of factors; the opportunities for science, the flight trajectory, and the cruise phase environment, among others. Many deep space missions employ long cruises to their final destination with minimal science activities along the way; others may perform science observations on a near-continuous basis. This paper discusses approaches employed by two NASA missions implemented by the Johns Hopkins University Applied Physics Laboratory (JHU/APL) to minimize mission operations costs without compromising mission success: the New Horizons mission to Pluto, and the Solar Terrestrial Relations Observatories (STEREO). The New Horizons spacecraft launched in January 2006 for an encounter with the Pluto system.The spacecraft trajectory required no deterministic on-board delta-V, and so the mission ops team then settled in for the rest of its 9.5-year cruise. The spacecraft has spent much of its cruise phase in a "hibernation" mode, which has enabled the spacecraft to be maintained with a small operations team, and minimized the contact time required from the NASA Deep Space Network. The STEREO mission is comprised of two three-axis stabilized sun-staring spacecraft in heliocentric orbit at a distance of 1 AU from the sun. The spacecraft were launched in October 2006. The STEREO instruments operate in a "decoupled" mode from the spacecraft, and from each other. Since STEREO operations are largely routine, unattended ground station contact operations were implemented early in the mission. Commands flow from the MOC to be uplinked, and the data recorded on-board is downlinked and relayed back to the MOC. Tools run in the MOC to assess the health and performance of ground system components. Alerts are generated and personnel are notified of any problems. Spacecraft telemetry is similarly monitored and alarmed, thus ensuring safe, reliable, low cost operations.

  4. Snags hit tethered satellite mission

    NASA Technical Reports Server (NTRS)

    Schuiling, Roelof

    1993-01-01

    The processing and course of the STS-46 Space Shuttle Atlantis mission are described. Problems experienced by the astronaut team in deploying the Tethered Satellite System during the mission are recounted.

  5. Flying Cassini with Virtual Operations Teams

    NASA Technical Reports Server (NTRS)

    Dodd, Suzanne; Gustavson, Robert

    1998-01-01

    The Cassini Program's challenge is to fly a large, complex mission with a reduced operations budget. A consequence of the reduced budget is elimination of the large, centrally located group traditionally used for uplink operations. Instead, responsibility for completing parts of the uplink function is distributed throughout the Program. A critical strategy employed to handle this challenge is the use of Virtual Uplink Operations Teams. A Virtual Team is comprised of a group of people with the necessary mix of engineering and science expertise who come together for the purpose of building a specific uplink product. These people are drawn from throughout the Cassini Program and participate across a large geographical area (from Germany to the West coast of the USA), covering ten time zones. The participants will often split their time between participating in the Virtual Team and accomplishing their core responsibilities, requiring significant planning and time management. When the particular uplink product task is complete, the Virtual Team disbands and the members turn back to their home organization element for future work assignments. This time-sharing of employees is used on Cassini to build mission planning products, via the Mission Planning Virtual Team, and sequencing products and monitoring of the sequence execution, via the Sequence Virtual Team. This challenging, multitasking approach allows efficient use of personnel in a resource constrained environment.

  6. Developing a corss-project support system during mission operations: Deep Space 1 extended mission flight control

    NASA Technical Reports Server (NTRS)

    Scarffe, V. A.

    2002-01-01

    NASA is focusing on small, low-cost spacecraft for both planetary and earth science missions. Deep Space 1 (DS1) was the first mission to be launched by the NMP. The New Millennium Project (NMP) is designed to develop and test new technology that can be used on future science missions with lower cost and risk. The NMP is finding ways to reduce cost not only in development, but also in operations. DS 1 was approved for an extended mission, but the budget was not large, so the project began looking into part time team members shared with other projects. DS1 launched on October 24, 1998, in it's primary mission it successfully tested twelve new technologies. The extended mission started September 18, 1999 and ran through the encounter with Comet Borrelly on September 22,2001. The Flight Control Team (FCT) was one team that needed to use part time or multi mission people. Circumstances led to a situation where for the few months before the Borrelly encounter in September of 2001 DSl had no certified full time Flight Control Engineers also known as Aces. This paper examines how DS 1 utilized cross-project support including the communication between different projects, and the how the tools used by the Flight Control Engineer fit into cross-project support.

  7. Five Years of NASA Science and Engineering in the Classroom: The Integrated Product Team/NASA Space Missions Course

    NASA Astrophysics Data System (ADS)

    Hakkila, Jon; Runyon, Cassndra; Benfield, M. P. J.; Turner, Matthew W.; Farrington, Phillip A.

    2015-08-01

    We report on five years of an exciting and successful educational collaboration in which science undergraduates at the College of Charleston work with engineering seniors at the University of Alabama in Huntsville to design a planetary science mission in response to a mock announcement of opportunity. Alabama high schools are also heavily involved in the project, and other colleges and universities have also participated. During the two-semester course students learn about scientific goals, past missions, methods of observation, instrumentation, and component integration, proposal writing, and presentation. More importantly, students learn about real-world communication and teamwork, and go through a series of baseline reviews before presenting their results at a formal final review for a panel of NASA scientists and engineers. The project is competitive, with multiple mission designs competing with one another for the best review score. Past classes have involved missions to Venus, Europa, Titan, Mars, asteroids, comets, and even the Moon. Classroom successes and failures have both been on epic scales.

  8. STS-61 mission director's post-mission report

    NASA Technical Reports Server (NTRS)

    Newman, Ronald L.

    1995-01-01

    To ensure the success of the complex Hubble Space Telescope servicing mission, STS-61, NASA established a number of independent review groups to assess management, design, planning, and preparation for the mission. One of the resulting recommendations for mission success was that an overall Mission Director be appointed to coordinate management activities of the Space Shuttle and Hubble programs and to consolidate results of the team reviews and expedite responses to recommendations. This report presents pre-mission events important to the experience base of mission management, with related Mission Director's recommendations following the event(s) to which they apply. All Mission Director's recommendations are presented collectively in an appendix. Other appendixes contain recommendations from the various review groups, including Payload Officers, the JSC Extravehicular Activity (EVA) Section, JSC EVA Management Office, JSC Crew and Thermal Systems Division, and the STS-61 crew itself. This report also lists mission events in chronological order and includes as an appendix a post-mission summary by the lead Payload Deployment and Retrieval System Officer. Recommendations range from those pertaining to specific component use or operating techniques to those for improved management, review, planning, and safety procedures.

  9. Cassini End of Mission

    NASA Image and Video Library

    2017-09-15

    Cassini program manager at JPL, Earl Maize, standing, watches telemetry come in from Cassini with Julie Bellerose, left, Duane Roth, second from left, and Mar Vaquero of the Cassini navigation team in the mission control room, Friday, Sept. 15, 2017 at NASA's Jet Propulsion Laboratory in Pasadena, California. Since its arrival in 2004, the Cassini-Huygens mission has been a discovery machine, revolutionizing our knowledge of the Saturn system and captivating us with data and images never before obtained with such detail and clarity. On Sept. 15, 2017, operators deliberately plunged the spacecraft into Saturn, as Cassini gathered science until the end. The “plunge” ensures Saturn’s moons will remain pristine for future exploration. During Cassini’s final days, mission team members from all around the world gathered at NASA’s Jet Propulsion Laboratory, Pasadena, California, to celebrate the achievements of this historic mission. Photo Credit: (NASA/Joel Kowsky)

  10. Cassini End of Mission

    NASA Image and Video Library

    2017-09-15

    Cassini program manager at JPL, Earl Maize, left, and spacecraft operations team manager for the Cassini mission at Saturn, Julie Webster, right, embrace after the Cassini spacecraft plunged into Saturn, Friday, Sept. 15, 2017 at NASA's Jet Propulsion Laboratory in Pasadena, California. Since its arrival in 2004, the Cassini-Huygens mission has been a discovery machine, revolutionizing our knowledge of the Saturn system and captivating us with data and images never before obtained with such detail and clarity. On Sept. 15, 2017, operators will deliberately plunge the spacecraft into Saturn, as Cassini gathered science until the end. The “plunge” ensures Saturn’s moons will remain pristine for future exploration. During Cassini’s final days, mission team members from all around the world gathered at NASA’s Jet Propulsion Laboratory, Pasadena, California, to celebrate the achievements of this historic mission. Photo Credit: (NASA/Joel Kowsky)

  11. Developing Your Dream Team

    ERIC Educational Resources Information Center

    Gatlin, Kenda

    2005-01-01

    Almost anyone has held various roles on a team, be it a family unit, sports team, or a project-oriented team. As an educator, one must make a conscious decision to build and invest in a team. Gathering the best team possible will help one achieve one's goals. This article explores some of the key reasons why it is important to focus on the team…

  12. Physiological monitoring of team and task stressors

    NASA Astrophysics Data System (ADS)

    Orasanu, Judith; Tada, Yuri; Kraft, Norbert; Fischer, Ute

    2005-05-01

    Sending astronauts into space, especially on long-durations missions (e.g. three-year missions to Mars), entails enormous risk. Threats include both physical dangers of radiation, bone loss and other consequences of weightlessness, and also those arising from interpersonal problems associated with extended life in a high-risk isolated and confined environment. Before undertaking long-duration missions, NASA seeks to develop technologies to monitor indicators of potentially debilitating stress at both the individual and team level so that countermeasures can be introduced to prevent further deterioration. Doing so requires a better understanding of indicators of team health and performance. To that end, a study of team problem solving in a simulation environment was undertaken to explore effects of team and task stress. Groups of four males (25-45 yrs) engaged in six dynamic computer-based Antarctic search and rescue missions over four days. Both task and team stressors were manipulated. Physiological responses (ECG, respiration rate and amplitude, SCL, EMG, and PPG); communication (voice and email); individual personality and subjective team dynamics responses were collected and related to task performance. Initial analyses found that physiological measures can be used to identify transient stress, predict performance, and reflect subjective workload. Muscle tension and respiration were the most robust predictors. Not only the level of arousal but its variability during engagement in the task is important to consider. In general, less variability was found to be associated with higher levels of performance. Individuals scoring high on specific personality characteristics responded differently to task stress.

  13. e.motion - European Initiatives for a Future Gravity Field Mission

    NASA Astrophysics Data System (ADS)

    Gruber, T.

    2017-12-01

    Since 2010 a large team of European scientists, with the support of technological and industrial partners, is preparing proposals for new gravity field missions as follow-up to GRACE, GOCE and GRACE-FO. The main goal of the proposed mission concepts is the long term observation of the time variable gravity field with significantly increased spatial and temporal resolution as it can be performed nowadays with GRACE or in the near future with GRACE Follow-On. These observations are crucial for long term monitoring of mass variations in the system Earth in order to improve our knowledge about the global and regional water cycle as well as about processes of the solid Earth. Starting from the existing concepts of single pair mission like GRACE and GRACE-FO, sensitivity, spatial and temporal resolution shall be increased, such that also smaller scale time variable signals can be resolved, which cannot be detected with the current techniques. For such a mission concept new and significantly improved observation techniques are needed. This concerns in particular the measurement of inter-satellite distances, the observation of non-gravitational accelerations, the configuration of the satellite orbit and most important the implementation of constellation of satellite pairs. All in all three proposals have been prepared by the e.motion team specifying in detail the mission design and the performance in terms of science applications. Starting with a single-pair pendulum mission, which was proposed for ESA's Earth Explorer 8 call (EE8), more recently a double-pair Bender-type mission was proposed for the ESA's EE9 call. In between several studies on European (DLR and ESA) and inter-agency level (ESA-NASA) have been performed. The presentation provides a summary about all these initiatives, derives some conclusions which can be drawn from the mission proposals and study results and gives an outlook about future initiatives for gravity field missions in Europe.

  14. Planning Mars Memory: Learning from the Mer Mission

    NASA Technical Reports Server (NTRS)

    Linde, Charlotte

    2004-01-01

    Knowledge management for space exploration is part of a multi-generational effort at recognizing, preserving and transmitting learning. Each mission should be built on the learning, of both successes and failures, derived from previous missions. Knowledge management begins with learning, and the recognition that this learning has produced knowledge. The Mars Exploration Rover mission provides us with an opportunity to track how learning occurs, how it is recorded, and whether the representations of this learning will be optimally useful for subsequent missions. This paper focuses on the MER science and engineering teams during Rover operations. A NASA team conducted an observational study of the ongoing work and learning of the these teams. Learning occurred in a wide variety of areas: how to run two teams on Mars time for three months; how to use the instruments within the constraints of the martian environment, the deep space network and the mission requirements; how to plan science strategy; how best to use the available software tools. This learning is preserved in many ways. Primarily it resides in peoples memories, to be carried on to the next mission. It is also encoded in stones, in programming sequences, in published reports, and in lessons learned activities, Studying learning and knowledge development as it happens allows us to suggest proactive ways of capturing and using it across multiple missions and generations.

  15. Overview of a Preliminary Destination Mission Concept for a Human Orbital Mission to the Martial Moons

    NASA Technical Reports Server (NTRS)

    Mazanek, D. D.; Abell, P. A.; Antol, J.; Barbee, B. W.; Beaty, D. W.; Bass, D. S.; Castillo-Rogez, J. C.; Coan, D. A.; Colaprete, A.; Daugherty, K. J.; hide

    2012-01-01

    The National Aeronautics and Space Administration s Human Spaceflight Architecture Team (HAT) has been developing a preliminary Destination Mission Concept (DMC) to assess how a human orbital mission to one or both of the Martian moons, Phobos and Deimos, might be conducted as a follow-on to a human mission to a near-Earth asteroid (NEA) and as a possible preliminary step prior to a human landing on Mars. The HAT Mars-Phobos-Deimos (MPD) mission also permits the teleoperation of robotic systems by the crew while in the Mars system. The DMC development activity provides an initial effort to identify the science and exploration objectives and investigate the capabilities and operations concepts required for a human orbital mission to the Mars system. In addition, the MPD Team identified potential synergistic opportunities via prior exploration of other destinations currently under consideration.

  16. Red Teaming Agility (Briefing Charts)

    DTIC Science & Technology

    2014-06-01

    are termed “ antifragile ”. Black Swan Model for Deep Red Futures The future is dominated not by trends, but by outliers, extreme events that lie...disproportionately higher mission impact. Agility is a measure of antifragile systems Red Teaming Defined Red Teaming is a function to provide

  17. TEAM - Titan Exploration Atmospheric Microprobes

    NASA Astrophysics Data System (ADS)

    Nixon, Conor; Esper, Jaime; Aslam, Shahid; Quilligan, Gerald

    2016-10-01

    The astrobiological potential of Titan's surface hydrocarbon liquids and probable interior water ocean has led to its inclusion as a destination in NASA's "Ocean Worlds" initiative, and near-term investigation of these regions is a high-level scientific goal. TEAM is a novel initiative to investigate the lake and sea environs using multiple dropsondes -scientific probes derived from an existing cubesat bus architecture (CAPE - the Cubesat Application for Planetary Exploration) developed at NASA GSFC. Each 3U probe will parachute to the surface, making atmospheric structure and composition measurements during the descent, and photographing the surface - land, shoreline and seas - in detail. TEAM probes offer a low-cost, high-return means to explore multiple areas on Titan, yielding crucial data about the condensing chemicals, haze and cloud layers, winds, and surface features of the lakes and seas. These microprobes may be included on a near-term New Frontiers class mission to the Saturn system as additional payload, bringing increased scientific return and conducting reconnaissance for future landing zones. In this presentation we describe the probe architecture, baseline payload, flight profile and the unique engineering and science data that can be returned.

  18. Cassini End of Mission Press Conference

    NASA Image and Video Library

    2017-09-15

    Cassini program manager at JPL, Earl Maize, left, Cassini project scientist at JPL, Linda Spilker, center, and spacecraft operations team manager for the Cassini mission at Saturn, Julie Webster, right, react to seeing images of the Cassini science and engineering teams during a press conference held after the end of the Cassini mission, Friday, Sept. 15, 2017 at NASA's Jet Propulsion Laboratory in Pasadena, California. Since its arrival in 2004, the Cassini-Huygens mission has been a discovery machine, revolutionizing our knowledge of the Saturn system and captivating us with data and images never before obtained with such detail and clarity. On Sept. 15, 2017, operators deliberately plunged the spacecraft into Saturn, as Cassini gathered science until the end. Loss of contact with the Cassini spacecraft occurred at 7:55 a.m. EDT (4:55 a.m. PDT). The “plunge” ensures Saturn’s moons will remain pristine for future exploration. During Cassini’s final days, mission team members from all around the world gathered at NASA’s Jet Propulsion Laboratory, Pasadena, California, to celebrate the achievements of this historic mission. Photo Credit: (NASA/Joel Kowsky)

  19. Shuttle remote manipulator system mission preparation and operations

    NASA Technical Reports Server (NTRS)

    Smith, Ernest E., Jr.

    1989-01-01

    The preflight planning, analysis, procedures development, and operations support for the Space Transportation System payload deployment and retrieval missions utilizing the Shuttle Remote Manipulator System are summarized. Analysis of the normal operational loads and failure induced loads and motion are factored into all procedures. Both the astronaut flight crews and the Mission Control Center flight control teams receive considerable training for standard and mission specific operations. The real time flight control team activities are described.

  20. GLAS Long-Term Archive: Preservation and Stewardship for a Vital Earth Observing Mission

    NASA Astrophysics Data System (ADS)

    Fowler, D. K.; Moses, J. F.; Zwally, J.; Schutz, B. E.; Hancock, D.; McAllister, M.; Webster, D.; Bond, C.

    2012-12-01

    Data Stewardship, preservation, and reproducibility are fast becoming principal parts of a data manager's work. In an era of distributed data and information systems, it is of vital importance that organizations make a commitment to both current and long-term goals of data management and the preservation of scientific data. Satellite missions and instruments go through a lifecycle that involves pre-launch calibration, on-orbit data acquisition and product generation, and final reprocessing. Data products and descriptions flow to the archives for distribution on a regular basis during the active part of the mission. However there is additional information from the product generation and science teams needed to ensure the observations will be useful for long term climate studies. Examples include ancillary input datasets, product generation software, and production history as developed by the team during the course of product generation. These data and information will need to be archived after product data processing is completed. NASA has developed a set of Earth science data and information content requirements for long term preservation that is being used for all the EOS missions as they come to completion. Since the ICESat/GLAS mission was one of the first to end, NASA and NSIDC, in collaboration with the science team, are collecting data, software, and documentation, preparing for long-term support of the ICESat mission. For a long-term archive, it is imperative to preserve sufficient information about how products were prepared in order to ensure future researchers that the scientific results are accurate, understandable, and useable. Our experience suggests data centers know what to preserve in most cases. That is, the processing algorithms along with the Level 0 or Level 1a input and ancillary products used to create the higher-level products will be archived and made available to users. In other cases, such as pre-launch, calibration/validation, and test

  1. Cassini End of Mission

    NASA Image and Video Library

    2017-09-14

    Cassini program manager at JPL, Earl Maize, is seen in mission control of the Space Flight Operations Center as the Cassini team wait for the spacecraft to establish a connection with NASA's Deep Space Network to begin the final playback of its data recorder, Thursday, Sept. 14, 2017 at NASA's Jet Propulsion Laboratory in Pasadena, California. Since its arrival in 2004, the Cassini-Huygens mission has been a discovery machine, revolutionizing our knowledge of the Saturn system and captivating us with data and images never before obtained with such detail and clarity. On Sept. 15, 2017, operators will deliberately plunge the spacecraft into Saturn, as Cassini gathered science until the end. The “plunge” ensures Saturn’s moons will remain pristine for future exploration. During Cassini’s final days, mission team members from all around the world gathered at NASA’s Jet Propulsion Laboratory, Pasadena, California, to celebrate the achievements of this historic mission. Photo Credit: (NASA/Joel Kowsky)

  2. NASA's Gravitational - Wave Mission Concept Study

    NASA Technical Reports Server (NTRS)

    Stebbins, Robin; Jennrich, Oliver; McNamara, Paul

    2012-01-01

    With the conclusion of the NASA/ESA partnership on the Laser Interferometer Space Antenna (LISA) Project, NASA initiated a study to explore mission concepts that will accomplish some or all of the LISA science objectives at lower cost. The Gravitational-Wave Mission Concept Study consisted of a public Request for Information (RFI), a Core Team of NASA engineers and scientists, a Community Science Team, a Science Task Force, and an open workshop. The RFI yielded were 12 mission concepts, 3 instrument concepts and 2 technologies. The responses ranged from concepts that eliminated the drag-free test mass of LISA to concepts that replace the test mass with an atom interferometer. The Core Team reviewed the noise budgets and sensitivity curves, the payload and spacecraft designs and requirements, orbits and trajectories and technical readiness and risk. The Science Task Force assessed the science performance by calculating the horizons. the detection rates and the accuracy of astrophysical parameter estimation for massive black hole mergers, stellar-mass compact objects inspiraling into central engines. and close compact binary systems. Three mission concepts have been studied by Team-X, JPL's concurrent design facility. to define a conceptual design evaluate kt,y performance parameters. assess risk and estimate cost and schedule. The Study results are summarized.

  3. Are self-directed work teams successful and effective tools for today`s organization?

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arnwine, A.D.

    1995-03-01

    The purpose of this research is to (1) show the effectiveness and success of self-directed work teams within the organization, (2) emphasize the importance of team building in the success of the team, and (3) assist organizations in building self-directed work teams. The researcher used a direct survey and studied the following team building techniques: (1) Is the team`s mission clearly defined to each team member? (2) Are the goals clearly defined and achievable by all team members? (3) Will empowerment (decision-making power) be given equally to all team members? (4) Will open and honest communication be allowed among teammore » members? (5) Will each team member be respected and valued for his/her position on the team? (6) Are self-directed work teams effectively rewarded for accomplishments? (7) Have team members received adequate training to effectively complete their job tasks? Upon completion of the literature review and statistical data, and after analyzing the seven areas of team building techniques, it was determined three of the four teams were successful and effective. The only area of concern to the organization is that the participants felt they did not have true ownership of their teams; that is, team members were not given full empowerment. According to this study and the review of literature, full empowerment must be given to achieve successful and effective teams. If true empowerment is not given, the team will suffer in other areas of team building, and the organization will lose a valuable tool.« less

  4. Asteroid Redirect Mission: Update on Planetary Defense Demonstration and Small Bodies Benefits and Community Interaction

    NASA Astrophysics Data System (ADS)

    Reeves, D.; Mazanek, D. D.; Abell, P. A.; Brophy, J. R.; Chodas, P. W.; Cichy, B. D.

    2016-12-01

    The National Aeronautics and Space Administration (NASA) is developing the Asteroid Redirect Mission (ARM) to robotically visit a large near-Earth asteroid (NEA), collect a multi-ton boulder and regolith samples from its surface, demonstrate the enhanced gravity tractor (EGT) planetary defense technique, return the asteroidal material to a stable orbit around the Moon, and explore the returned material with a crewed mission in the mid-2020s. Recent analysis of the EGT has led to a change in the robotic baseline operations from a halo orbit, to an in-line stand-off. This study took into account the uncertainties in size and mass of the current reference target (2008 EV5), the desire to be able to perform the EGT operations with the collected boulder augmenting the spacecraft mass or with the spacecraft alone, the assumed capability of the ARM solar electric propulsion (SEP) system, and the extensibility to future planetary defense missions. This presentation will cover the findings that led to this change in the baseline, as well as the benefits that this EGT demonstration will provide. ARM is a capability and technology demonstration mission, which will also benefit our understanding of small bodies in the areas of science, planetary defense, and asteroidal resources and in-situ resource utilization (ISRU). The synergistic benefits of both the robotic and crewed segments will be discussed in addition to describing ARM's interaction with communities that are interested in small bodies, including: the Formulation Assessment and Support Team (FAST) effort, the Small Bodies Assessment Group (SBAG) Special Action Team (SAT) effort, and the upcoming Investigation Team (IT). The IT, which is expected to be announced in the spring of 2017, will assist the ARM project in the definition, design, development, and operations phases of the ARRM with the goal of maximizing the probability of mission success and the knowledge return from the mission.

  5. Rotationally resolved colors of the targets of NASA's Lucy mission

    NASA Astrophysics Data System (ADS)

    Emery, Joshua; Mottola, Stefano; Brown, Mike; Noll, Keith; Binzel, Richard

    2018-05-01

    We propose rotationally resolved photometry at 3.6 and 4.5 um of 5 Trojan asteroids and one Main Belt asteroid - the targets of NASA's Lucy mission. The proposed Spitzer observations are designed to meet a combination of science goals and mission support objectives. Science goals 1) Search for signatures of volatiles and/or organics on the surfaces. a. This goal includes resolving a discrepancy between previous WISE and Spitzer measurements of Trojans 2) Provide new constraints on the cause of rotational spectral heterogeneity detected on 3548 Eurybates at shorter wavelengths a. Determine whether the heterogeneity (Fig 1) extends to the 3-5 um region 3) Assess the possibility for spectral heterogeneity on the other targets a. This goal will help test the hypothesis of Wong and Brown (2015) that the near-surface interiors of Trojans differ from their surfaces 4) Thermal data at 4.5 um for the Main Belt target Donaldjohanson will refine estimates of size, albedo, and provide the first estimate of thermal inertia Mission support objectives 1) Assess scientifically optimal encounter times (viewing geometries) for the fly-bys a. Characterizing rotational spectral units now will enable the team to choose the most scientifically valuable part of the asteroid to view 2) Gather data to optimize observing parameters for Lucy instruments a. Measuring brightness in the 3 - 5 um region and resolving the discrepancy between WISE and Spitzer will enable better planning of the Lucy spectral observations in this wavelength range 3) The size, albedo, and thermal inertia of Donaldjohanson are fundamental data for planning the encounter with that Main Belt asteroid

  6. The Outer Planetary Mission Design Project

    NASA Astrophysics Data System (ADS)

    Benfield, Michael; Turner, M. W.

    2010-10-01

    With the recent focus from the planetary science community on the outer planets of the solar system, The University of Alabama in Huntsville Integrated Product Team program is embarking on a new challenge to develop an outer planetary mission for the academic year 2010-2011. Currently four bodies are of interest for this mission: Titan, Europa, Triton, and Enceledus, with one body being chosen by the instructors by the beginning of the fall semester. This project will use the 2010 Discovery Announcement of Opportunity as its Request for Proposal (RFP). All of the teams competing in this project will use the AO to respond with a proposal to the instructors for their proposed mission and spacecraft concept. The project employs the two-semester design sequence of the IPT program to provide a framework for the development of this mission. This sequence is divided into four phases. Phase 1 - Requirements Development - focuses on the development of both the scientific and engineering requirements of the mission. During this phase the teams work very closely with the PI organization, represented by the College of Charleston. Phase 2 - Team Formation and Architecture Development - concentrates on the assessment of the overall mission architecture from the launch vehicle to the ground operations of the proposed spacecraft. Phase 3 - System Definition - provides for spacecraft subsystem trade studies and further refinement of the specific spacecraft to meet the scientific requirements and objectives developed in Phase 1. Phase 4 - Design - is the phase where the engineers provide the spacecraft design that is required for the mission of interest. At the conclusion of Phases 2 and 4, an external review board evaluates the proposed designs and chooses one winner of the competition.

  7. Multi-team dynamics and distributed expertise in imission operations.

    PubMed

    Caldwell, Barrett S

    2005-06-01

    The evolution of space exploration has brought an increased awareness of the social and socio-technical issues associated with team performance and task coordination, both for the onboard astronauts and in mission control. Spaceflight operations create a unique environment in which to address classic group dynamics topics including communication, group process, knowledge development and sharing, and time-critical task performance. Mission operations in the early years of the 21st century have developed into a set of complex, multi-team task settings incorporating multiple mission control teams and flight crews interacting in novel ways. These more complex operational settings help highlight the emergence of a new paradigm of distributed supervisory coordination, and the need to consider multiple dimensions of expertise being supported and exchanged among team members. The creation of new mission profiles with very long-duration time scales (months, rather than days) for the International Space Station, as well as planned exploration missions to the Moon and Mars, emphasize fundamental distinctions from the 40 yr from Mercury to the Space Shuttle. Issues in distributed expertise and information flow in mission control settings from two related perspectives are described. A general conceptual view of knowledge sharing and task synchronization is presented within the context of the mission control environment. This conceptual presentation is supplemented by analysis of quasi-experimental data collected from actual flight controllers at NASA-Johnson Space Center, Houston, TX.

  8. The Final Count Down: A Review of Three Decades of Flight Controller Training Methods for Space Shuttle Mission Operations

    NASA Technical Reports Server (NTRS)

    Dittermore, Gary; Bertels, Christie

    2011-01-01

    Operations of human spaceflight systems is extremely complex; therefore, the training and certification of operations personnel is a critical piece of ensuring mission success. Mission Control Center (MCC-H), at the Lyndon B. Johnson Space Center in Houston, Texas, manages mission operations for the Space Shuttle Program, including the training and certification of the astronauts and flight control teams. An overview of a flight control team s makeup and responsibilities during a flight, and details on how those teams are trained and certified, reveals that while the training methodology for developing flight controllers has evolved significantly over the last thirty years the core goals and competencies have remained the same. In addition, the facilities and tools used in the control center have evolved. Changes in methodology and tools have been driven by many factors, including lessons learned, technology, shuttle accidents, shifts in risk posture, and generational differences. Flight controllers share their experiences in training and operating the space shuttle. The primary training method throughout the program has been mission simulations of the orbit, ascent, and entry phases, to truly train like you fly. A review of lessons learned from flight controller training suggests how they could be applied to future human spaceflight endeavors, including missions to the moon or to Mars. The lessons learned from operating the space shuttle for over thirty years will help the space industry build the next human transport space vehicle.

  9. Assessment of a Statewide Palliative Care Team Training Course: COMFORT Communication for Palliative Care Teams.

    PubMed

    Wittenberg, Elaine; Ferrell, Betty; Goldsmith, Joy; Ragan, Sandra L; Paice, Judith

    2016-07-01

    Despite increased attention to communication skill training in palliative care, few interprofessional training programs are available and little is known about the impact of such training. This study evaluated a communication curriculum offered to interprofessional palliative care teams and examined the longitudinal impact of training. Interprofessional, hospital-based palliative care team members were competitively selected to participate in a two-day training using the COMFORT(TM SM) (Communication, Orientation and options, Mindful communication, Family, Openings, Relating, Team) Communication for Palliative Care Teams curriculum. Course evaluation and goal assessment were tracked at six and nine months postcourse. Interprofessional palliative care team members (n = 58) representing 29 teams attended the course and completed course goals. Participants included 28 nurses, 16 social workers, 8 physicians, 5 chaplains, and one psychologist. Precourse surveys assessed participants' perceptions of institution-wide communication performance across the continuum of care and resources supporting optimum communication. Postcourse evaluations and goal progress monitoring were used to assess training effectiveness. Participants reported moderate communication effectiveness in their institutions, with the weakest areas being during bereavement and survivorship care. Mean response to course evaluation across all participants was greater than 4 (scale of 1 = low to 5 = high). Participants taught an additional 962 providers and initiated institution-wide training for clinical staff, new hires, and volunteers. Team member training improved communication processes and increased attention to communication with family caregivers. Barriers to goal implementation included a lack of institutional support as evidenced in clinical caseloads and an absence of leadership and funding. The COMFORT(TM SM) communication curriculum is effective palliative care communication

  10. Characterizing Distributed Concurrent Engineering Teams: A Descriptive Framework for Aerospace Concurrent Engineering Design Teams

    NASA Technical Reports Server (NTRS)

    Chattopadhyay, Debarati; Hihn, Jairus; Warfield, Keith

    2011-01-01

    As aerospace missions grow larger and more technically complex in the face of ever tighter budgets, it will become increasingly important to use concurrent engineering methods in the development of early conceptual designs because of their ability to facilitate rapid assessments and trades in a cost-efficient manner. To successfully accomplish these complex missions with limited funding, it is also essential to effectively leverage the strengths of individuals and teams across government, industry, academia, and international agencies by increased cooperation between organizations. As a result, the existing concurrent engineering teams will need to increasingly engage in distributed collaborative concurrent design. This paper is an extension of a recent white paper written by the Concurrent Engineering Working Group, which details the unique challenges of distributed collaborative concurrent engineering. This paper includes a short history of aerospace concurrent engineering, and defines the terms 'concurrent', 'collaborative' and 'distributed' in the context of aerospace concurrent engineering. In addition, a model for the levels of complexity of concurrent engineering teams is presented to provide a way to conceptualize information and data flow within these types of teams.

  11. Identification and Classification of Common Risks in Space Science Missions

    NASA Technical Reports Server (NTRS)

    Hihn, Jairus M.; Chattopadhyay, Debarati; Hanna, Robert A.; Port, Daniel; Eggleston, Sabrina

    2010-01-01

    Due to the highly constrained schedules and budgets that NASA missions must contend with, the identification and management of cost, schedule and risks in the earliest stages of the lifecycle is critical. At the Jet Propulsion Laboratory (JPL) it is the concurrent engineering teams that first address these items in a systematic manner. Foremost of these concurrent engineering teams is Team X. Started in 1995, Team X has carried out over 1000 studies, dramatically reducing the time and cost involved, and has been the model for other concurrent engineering teams both within NASA and throughout the larger aerospace community. The ability to do integrated risk identification and assessment was first introduced into Team X in 2001. Since that time the mission risks identified in each study have been kept in a database. In this paper we will describe how the Team X risk process is evolving highlighting the strengths and weaknesses of the different approaches. The paper will especially focus on the identification and classification of common risks that have arisen during Team X studies of space based science missions.

  12. Tracking dynamic team activity

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tambe, M.

    1996-12-31

    AI researchers are striving to build complex multi-agent worlds with intended applications ranging from the RoboCup robotic soccer tournaments, to interactive virtual theatre, to large-scale real-world battlefield simulations. Agent tracking - monitoring other agent`s actions and inferring their higher-level goals and intentions - is a central requirement in such worlds. While previous work has mostly focused on tracking individual agents, this paper goes beyond by focusing on agent teams. Team tracking poses the challenge of tracking a team`s joint goals and plans. Dynamic, real-time environments add to the challenge, as ambiguities have to be resolved in real-time. The central hypothesismore » underlying the present work is that an explicit team-oriented perspective enables effective team tracking. This hypothesis is instantiated using the model tracing technology employed in tracking individual agents. Thus, to track team activities, team models are put to service. Team models are a concrete application of the joint intentions framework and enable an agent to track team activities, regardless of the agent`s being a collaborative participant or a non-participant in the team. To facilitate real-time ambiguity resolution with team models: (i) aspects of tracking are cast as constraint satisfaction problems to exploit constraint propagation techniques; and (ii) a cost minimality criterion is applied to constrain tracking search. Empirical results from two separate tasks in real-world, dynamic environments one collaborative and one competitive - are provided.« less

  13. The Binary Asteroid in-situ Explorer (BASiX) Mission

    NASA Astrophysics Data System (ADS)

    Dissly, Richard; Scheeres, D. J.; Nilsen, E.; Roark, S.; Frazier, W.; Bank, T.; Rosing, D.; Jordan, E.; BASiX Science Team

    2010-10-01

    The Binary Asteroid in-situ Explorer (BASiX) Mission represents the next phase of asteroid exploration, carrying out geophysical experiments by active engagement with an asteroid in a controlled and repeatable manner. BASiX will address new and timely scientific goals that address unresolved issues at the heart of our understanding of these bodies and which serve as barriers to their future exploration. A primary objective of the BASiX Mission is to determine the fundamental mechanical and strength properties of an asteroid through the creation of craters on the asteroid surface using calibrated charges. BASiX also takes advantage of these experiments to further understand the weathering and seismic properties of an asteroid. By carrying out these experiments at a binary Near Earth Asteroid (NEA), BASiX also advances our understanding of these ubiquitous bodies in the small asteroid population. BASiX is an efficient and simple mission concept that can deliver revolutionary science with its threshold mission and adds substantial enhancements with its baseline mission. BASiX assembles an international team of top small body scientists and astronomers and is led by PI Dan Scheeres (University of Colorado). BASiX is managed by JPL, which is also where mission and science operations will be based. The BASiX Spacecraft is built by Ball Aerospace & Technologies Corp. Instruments are built by JPL and Ball with additional contributed instruments from CNES.

  14. The Right Stuff: A Look Back at Three Decades of Flight Controller Training for Space Shuttle Mission Operations

    NASA Technical Reports Server (NTRS)

    Dittemore, Gary D.; Bertels, Christie

    2010-01-01

    This paper will summarize the thirty-year history of Space Shuttle operations from the perspective of training in NASA Johnson Space Center's Mission Control Center. It will focus on training and development of flight controllers and instructors, and how training practices have evolved over the years as flight experience was gained, new technologies developed, and programmatic needs changed. Operations of human spaceflight systems is extremely complex, therefore the training and certification of operations personnel is a critical piece of ensuring mission success. Mission Control Center (MCC-H), at the Lyndon B. Johnson Space Center, in Houston, Texas manages mission operations for the Space Shuttle Program, including the training and certification of the astronauts and flight control teams. This paper will give an overview of a flight control team s makeup and responsibilities during a flight, and details on how those teams are trained and certified. The training methodology for developing flight controllers has evolved significantly over the last thirty years, while the core goals and competencies have remained the same. In addition, the facilities and tools used in the control center have evolved. These changes have been driven by many factors including lessons learned, technology, shuttle accidents, shifts in risk posture, and generational differences. Flight controllers will share their experiences in training and operating the Space Shuttle throughout the Program s history. A primary method used for training Space Shuttle flight control teams is by running mission simulations of the orbit, ascent, and entry phases, to truly "train like you fly." The audience will learn what it is like to perform a simulation as a shuttle flight controller. Finally, we will reflect on the lessons learned in training for the shuttle program, and how those could be applied to future human spaceflight endeavors.

  15. What Polar Bears Can Teach Us about Mission Creep

    DTIC Science & Technology

    2015-04-16

    or Phase 0 operations. Mission Creep, the expansion of a project or mission beyond its original goals, is often an outcome of such steady state...state or Phase 0 operations. Mission Creep, the expansion of a project or mission beyond its original goals, is often an outcome of such steady state...de Tocqueville Mission Creep is the expansion of an operation or mission beyond its original goals, often after initial success. It occurs when

  16. [Investigation of team processes that enhance team performance in business organization].

    PubMed

    Nawata, Kengo; Yamaguchi, Hiroyuki; Hatano, Toru; Aoshima, Mika

    2015-02-01

    Many researchers have suggested team processes that enhance team performance. However, past team process models were based on crew team, whose all team members perform an indivisible temporary task. These models may be inapplicable business teams, whose individual members perform middle- and long-term tasks assigned to individual members. This study modified the teamwork model of Dickinson and McIntyre (1997) and aimed to demonstrate a whole team process that enhances the performance of business teams. We surveyed five companies (member N = 1,400, team N = 161) and investigated team-level-processes. Results showed that there were two sides of team processes: "communication" and "collaboration to achieve a goal." Team processes in which communication enhanced collaboration improved team performance with regard to all aspects of the quantitative objective index (e.g., current income and number of sales), supervisor rating, and self-rating measurements. On the basis of these results, we discuss the entire process by which teamwork enhances team performance in business organizations.

  17. Simplifying the Analysis of Data from Multiple Heliophysics Instruments and Missions

    NASA Astrophysics Data System (ADS)

    Bazell, D.; Vandegriff, J. D.

    2014-12-01

    Understanding the intertwined plasma, particles and fields connecting the Sun and the Earth requires combining data from many diverse sources, but there are still many technological barriers that complicate the merging of data from different instruments and missions. We present an emerging data serving capability that provides a uniform way to access heterogeneous and distributed data. The goal of our data server is to provide a standardized data access mechanism that is identical for data of any format and layout (CDF, custom binary, FITS, netCDF, CSV and other flavors of ASCII, etc). Data remain in their original format and location (i.e., at instrument team sites or existing data centers), and our data server delivers a dynamically reformatted view of the data. Scientists can then use tools (clients that talk to the server) that offer a single interface for browsing, analyzing or downloading many different contemporary and legacy heliophysics data sets. Our current server accesses many CDF data resources at CDAWeb, as well as multiple other instrument team sites. Our webservice will be deployed on the Amazon Cloud at http://datashop.elasticbeanstalk.com/. Two basic clients will also be demonstrated: one in Java and one in IDL. Python, Perl, and Matlab clients are also planned. Complex missions such as Solar Orbiter and Solar Probe Plus will benefit greatly from tools that enable multi-instrument and multi-mission data comparison.

  18. Mission operations management

    NASA Technical Reports Server (NTRS)

    Rocco, David A.

    1994-01-01

    Redefining the approach and philosophy that operations management uses to define, develop, and implement space missions will be a central element in achieving high efficiency mission operations for the future. The goal of a cost effective space operations program cannot be realized if the attitudes and methodologies we currently employ to plan, develop, and manage space missions do not change. A management philosophy that is in synch with the environment in terms of budget, technology, and science objectives must be developed. Changing our basic perception of mission operations will require a shift in the way we view the mission. This requires a transition from current practices of viewing the mission as a unique end product, to a 'mission development concept' built on the visualization of the end-to-end mission. To achieve this change we must define realistic mission success criteria and develop pragmatic approaches to achieve our goals. Custom mission development for all but the largest and most unique programs is not practical in the current budget environment, and we simply do not have the resources to implement all of our planned science programs. We need to shift our management focus to allow us the opportunity make use of methodologies and approaches which are based on common building blocks that can be utilized in the space, ground, and mission unique segments of all missions.

  19. Mission operations and command assurance: Flight operations quality improvements

    NASA Technical Reports Server (NTRS)

    Welz, Linda L.; Bruno, Kristin J.; Kazz, Sheri L.; Potts, Sherrill S.; Witkowski, Mona M.

    1994-01-01

    Mission Operations and Command Assurance (MO&CA) is a Total Quality Management (TQM) task on JPL projects to instill quality in flight mission operations. From a system engineering view, MO&CA facilitates communication and problem-solving among flight teams and provides continuous solving among flight teams and provides continuous process improvement to reduce risk in mission operations by addressing human factors. The MO&CA task has evolved from participating as a member of the spacecraft team, to an independent team reporting directly to flight project management and providing system level assurance. JPL flight projects have benefited significantly from MO&CA's effort to contain risk and prevent rather than rework errors. MO&CA's ability to provide direct transfer of knowledge allows new projects to benefit from previous and ongoing flight experience.

  20. 12 CFR 1282.12 - Low- and Moderate-Income Housing Goal.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Low- and Moderate-Income Housing Goal. 1282.12 Section 1282.12 Banks and Banking FEDERAL HOUSING FINANCE AGENCY HOUSING GOALS AND MISSION ENTERPRISE HOUSING GOALS AND MISSION Housing Goals § 1282.12 Low- and Moderate-Income Housing Goal. (a) Purpose of...

  1. Establishing Community College Goals.

    ERIC Educational Resources Information Center

    Leeson, Marjorie

    In 1975, Delta College began a project to prepare a set of institutional goals and a mission statement for consideration and adoption by the college Senate and Board of Trustees, and to identify those goals that should take priority over the following five years. All areas of the college were represented on the goal development committee, and to…

  2. Tracking Team Dynamic Strategy Implemented in Sly Fox Mission 22

    DTIC Science & Technology

    communication between team members and track the overall status of the team social dynamic. This paper provides a detailed account of the need, methodology , results, benefits, and limitations of this strategy.

  3. Scientific analogs and the development of human mission architectures for the Moon, deep space and Mars

    NASA Astrophysics Data System (ADS)

    Lim, D. S. S.; Abercromby, A.; Beaton, K.; Brady, A. L.; Cardman, Z.; Chappell, S.; Cockell, C. S.; Cohen, B. A.; Cohen, T.; Deans, M.; Deliz, I.; Downs, M.; Elphic, R. C.; Hamilton, J. C.; Heldmann, J.; Hillenius, S.; Hoffman, J.; Hughes, S. S.; Kobs-Nawotniak, S. E.; Lees, D. S.; Marquez, J.; Miller, M.; Milovsoroff, C.; Payler, S.; Sehlke, A.; Squyres, S. W.

    2016-12-01

    Analogs are destinations on Earth that allow researchers to approximate operational and/or physical conditions on other planetary bodies and within deep space. Over the past decade, our team has been conducting geobiological field science studies under simulated deep space and Mars mission conditions. Each of these missions integrate scientific and operational research with the goal to identify concepts of operations (ConOps) and capabilities that will enable and enhance scientific return during human and human-robotic missions to the Moon, into deep space and on Mars. Working under these simulated mission conditions presents a number of unique challenges that are not encountered during typical scientific field expeditions. However, there are significant benefits to this working model from the perspective of the human space flight and scientific operations research community. Specifically, by applying human (and human-robotic) mission architectures to real field science endeavors, we create a unique operational litmus test for those ConOps and capabilities that have otherwise been vetted under circumstances that did not necessarily demand scientific data return meeting the rigors of peer-review standards. The presentation will give an overview of our team's recent analog research, with a focus on the scientific operations research. The intent is to encourage collaborative dialog with a broader set of analog research community members with an eye towards future scientific field endeavors that will have a significant impact on how we design human and human-robotic missions to the Moon, into deep space and to Mars.

  4. First-order error budgeting for LUVOIR mission

    NASA Astrophysics Data System (ADS)

    Lightsey, Paul A.; Knight, J. Scott; Feinberg, Lee D.; Bolcar, Matthew R.; Shaklan, Stuart B.

    2017-09-01

    Future large astronomical telescopes in space will have architectures that will have complex and demanding requirements to meet the science goals. The Large UV/Optical/IR Surveyor (LUVOIR) mission concept being assessed by the NASA/Goddard Space Flight Center is expected to be 9 to 15 meters in diameter, have a segmented primary mirror and be diffraction limited at a wavelength of 500 nanometers. The optical stability is expected to be in the picometer range for minutes to hours. Architecture studies to support the NASA Science and Technology Definition teams (STDTs) are underway to evaluate systems performance improvements to meet the science goals. To help define the technology needs and assess performance, a first order error budget has been developed. Like the JWST error budget, the error budget includes the active, adaptive and passive elements in spatial and temporal domains. JWST performance is scaled using first order approximations where appropriate and includes technical advances in telescope control.

  5. Recent Applications of Space Weather Research to NASA Space Missions

    NASA Technical Reports Server (NTRS)

    Willis, Emily M.; Howard, James W., Jr.; Miller, J. Scott; Minow, Joseph I.; NeergardParker, L.; Suggs, Robert M.

    2013-01-01

    Marshall Space Flight Center s Space Environments Team is committed to applying the latest research in space weather to NASA programs. We analyze data from an extensive set of space weather satellites in order to define the space environments for some of NASA s highest profile programs. Our goal is to ensure that spacecraft are designed to be successful in all environments encountered during their missions. We also collaborate with universities, industry, and other federal agencies to provide analysis of anomalies and operational impacts to current missions. This presentation is a summary of some of our most recent applications of space weather data, including the definition of the space environments for the initial phases of the Space Launch System (SLS), acquisition of International Space Station (ISS) frame potential variations during geomagnetic storms, and Nascap-2K charging analyses.

  6. The Habitable Exoplanet Imaging Mission (HabEx)

    NASA Astrophysics Data System (ADS)

    Mennesson, B.

    2017-12-01

    The Habitable-Exoplanet Imaging Mission (HabEx) is a candidate flagship mission being studied by NASA and the astrophysics community in preparation for the 2020 Decadal Survey. The HabEx mission concept is a large ( 4 to 6.5m) diffraction-limited optical space telescope, providing unprecedented resolution and contrast in the optical, with likely extensions into the near UV and near infrared domains. One of the primary goals of HabEx is to answer fundamental questions in exoplanet science, searching for and characterizing potentially habitable worlds, providing the first complete "family portraits" of planets around our nearest Sun-like neighbors and placing the solar system in the context of a diverse set of exoplanets. We report here on our team's early efforts in defining a scientifically compelling HabEx mission that is technologically executable, and timely for the next decade. In particular, we present preliminary architectures trade study results, quantifying technical requirements and predicting scientific outcome for a small number of design reference missions. We describe here our currently favorite "hybrid" architecture and its expected capabilities in terms of low resolution (R= 70 to 140) reflected light spectroscopic measurements and orbit determination. Results are shown for different types of exoplanets, including potentially habitable exoplanets located within the snow line of nearby main sequence stars. This research was carried out at the Jet Propulsion Laboratory, California Institute of Technology, under a contract with the National Aeronautics and Space Administration.

  7. Discovery Planetary Mission Operations Concepts

    NASA Technical Reports Server (NTRS)

    Coffin, R.

    1994-01-01

    The NASA Discovery Program of small planetary missions will provide opportunities to continue scientific exploration of the solar system in today's cost-constrained environment. Using a multidisciplinary team, JPL has developed plans to provide mission operations within the financial parameters established by the Discovery Program. This paper describes experiences and methods that show promise of allowing the Discovery Missions to operate within the program cost constraints while maintaining low mission risk, high data quality, and reponsive operations.

  8. Landsat science team meeting summary

    USGS Publications Warehouse

    Loveland, Thomas R.; Maiersperger, Tom; Irons, James R.; Woodcock, C.E.

    2011-01-01

    The Landsat Science Team sponsored by the U.S. Geo- logical Survey (USGS) and NASA met in Mesa, AZ, from March 1-3, 2011. The team met in Mesa so that they could receive briefings and tours of the Landsat Data Continuity Mission (LDCM) spacecraft that is being developed by Orbital Sciences Corporation in nearby Gilbert, AZ.

  9. The Mars 2020 Mission: The Next Step Forward in Mars Exploration

    NASA Astrophysics Data System (ADS)

    Meyer, M. A.; Schulte, M. D.

    2014-12-01

    The next rover mission to Mars represents the culmination of almost two decades of strategic missions in the exploration of Mars. Our understanding of the Red Planet has evolved from a global frozen desert to a dynamic world that once was warmer, wetter, and could have supported microbial life, and the series of missions reflect this evolution, moving from global reconnaissance to seeking the signs of life. The 2020 rover will be outfitted with seven sophisticated payload elements to conduct remote sensing and contact science, demonstrate exploration technology, and cache samples for potential return to Earth. The mission's capabilities exceed the threshold mission detailed in the Mars 2020 Science Definition Team 2013 report1 and meets the NRC's 2011 Decadal Survey's requirements for the highest priority mission of NASA's Planetary Science2. The instruments selected July 31, 2014, are able to determine elemental composition and mineralogy and detect organic compounds across spatial scales of meters to 100's of micrometers. The instrument suite includes a combination of a zooming, binocular, multi-spectral camera; a telescopic imager; two Raman spectrometers with different wavelength lasers (UV and Green); a visible/near-infrared spectrometer; a Laser-Induced Breakdown Spectrometer; an X-ray fluorescence spectrometer, a microscopic imager, and ground-penetrating radar. Their purpose is to enable the science team to establish the geological context of the landing site area, to assess whether past or present environments could support microbial life, to search for potential biosignatures, and to use this information to identify samples for caching. To prepare for future human exploration, the payload includes the ability for in situ resource utilization, converting CO2 to O2, the ability to assess physical characteristics of the dust, and environmental monitoring of the temperature, pressure, humidity, wind, and radiation. The Mars 2020 mission will pave a

  10. Predicted Exoplanet Yields for the HabEx Mission Concept

    NASA Astrophysics Data System (ADS)

    Stark, Christopher; Mennesson, Bertrand; HabEx STDT

    2018-01-01

    The Habitable Exoplanet Imaging Mission (HabEx) is a concept for a flagship mission to directly image and characterize extrasolar planets around nearby stars and to enable a broad range of general astrophysics. The HabEx Science and Technology Definition Team (STDT) is currently studying two architectures for HabEx. Here we summarize the exoplanet science yield of Architecture A, a 4 m monolithic off-axis telescope that uses a vortex coronagraph and a 72m external starshade occulter. We summarize the instruments' capabilities, present science goals and observation strategies, and discuss astrophysical assumptions. Using a yield optimization code, we predict the yield of potentially Earth-like extrasolar planets that could be detected, characterized, and searched for signs of habitability and/or life by HabEx. We demonstrate that HabEx could also detect and characterize a wide variety of exoplanets while searching for potentially Earth-like planets.

  11. Mars Reconnaissance Orbiter Mission: Systems Engineering Challenges on the Mars Reconnaissance Orbiter Mission

    NASA Technical Reports Server (NTRS)

    Havens, Glen G.

    2007-01-01

    MRO project is a system of systems requiring system engineering team to architect, design, integrate, test, and operate these systems at each level of the project. The challenge of system engineering mission objectives into a single mission architecture that can be integrated tested, launched, and operated. Systems engineering must translate high-level requirements into integrated mission design. Systems engineering challenges were overcome utilizing a combination by creative designs built into MRO's flight and ground systems: a) Design of sophisticated spacecraft targeting and data management capabilities b) Establishment of a strong operations team organization; c) Implementation of robust operational processes; and d) Development of strategic ground tools. The MRO system has met the challenge of its driving requirements: a) MRO began its two-year primary science phase on November 7, 2006, and by July 2007, met it minimum requirement to collect 15 Tbits of data after only eight months of operations. Currently we have collected 22 Tbits. b) Based on current performance, mission data return could return 70 Tbits of data by the end of the primary science phase in 2008.

  12. Cassini End of Mission Press Conference

    NASA Image and Video Library

    2017-09-15

    Spacecraft operations team manager for the Cassini mission at Saturn, Julie Webster is seen during a press conference held after the end of the Cassini mission, Friday, Sept. 15, 2017 at NASA's Jet Propulsion Laboratory in Pasadena, California. Since its arrival in 2004, the Cassini-Huygens mission has been a discovery machine, revolutionizing our knowledge of the Saturn system and captivating us with data and images never before obtained with such detail and clarity. On Sept. 15, 2017, operators deliberately plunged the spacecraft into Saturn, as Cassini gathered science until the end. Loss of contact with the Cassini spacecraft occurred at 7:55 a.m. EDT (4:55 a.m. PDT). The “plunge” ensures Saturn’s moons will remain pristine for future exploration. During Cassini’s final days, mission team members from all around the world gathered at NASA’s Jet Propulsion Laboratory, Pasadena, California, to celebrate the achievements of this historic mission. Photo Credit: (NASA/Joel Kowsky)

  13. 12 CFR 1282.13 - Multifamily special affordable housing goal and subgoal.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 12 Banks and Banking 10 2014-01-01 2014-01-01 false Multifamily special affordable housing goal... AND MISSION ENTERPRISE HOUSING GOALS AND MISSION Housing Goals § 1282.13 Multifamily special affordable housing goal and subgoal. (a) Multifamily housing goal and subgoal. An Enterprise shall be in...

  14. Spacelab simulation using a Lear Jet aircraft: Mission no. 4 (ASSESS program)

    NASA Technical Reports Server (NTRS)

    Reller, J. O., Jr.; Neel, C. B.; Mason, R. H.

    1975-01-01

    The fourth ASSESS Spacelab simulation mission utilizing a Lear Jet aircraft featured trained experiment operators (EOs) in place of the participating scientists, to simulate the role and functions of payload specialists in Spacelab who may conduct experiments developed by other scientists. The experiment was a broadband infrared photometer coupled to a 30-cm, open port, IR telescope. No compromises in equipment design or target selection were made to simplify operator tasks; the science goals of the mission were selected to advance the mainline research program of the principle investigator (PI). Training of the EOs was the responsibility of the PI team and consisted of laboratory sessions, on-site training during experiment integration, and integrated mission training using the aircraft as a high-fidelity simulator. The EO permission experience in these several disciplines proved adequate for normal experiment operations, but marginal for the identification and remedy of equipment malfunctions. During the mission, the PI utilized a TV communication system to assist the EOs to overcome equipment difficulties; both science and operations were successfully implemented.

  15. Using SFOC to fly the Magellan Venus mapping mission

    NASA Technical Reports Server (NTRS)

    Bucher, Allen W.; Leonard, Robert E., Jr.; Short, Owen G.

    1993-01-01

    Traditionally, spacecraft flight operations at the Jet Propulsion Laboratory (JPL) have been performed by teams of spacecraft experts utilizing ground software designed specifically for the current mission. The Jet Propulsion Laboratory set out to reduce the cost of spacecraft mission operations by designing ground data processing software that could be used by multiple spacecraft missions, either sequentially or concurrently. The Space Flight Operations Center (SFOC) System was developed to provide the ground data system capabilities needed to monitor several spacecraft simultaneously and provide enough flexibility to meet the specific needs of individual projects. The Magellan Spacecraft Team utilizes the SFOC hardware and software designed for engineering telemetry analysis, both real-time and non-real-time. The flexibility of the SFOC System has allowed the spacecraft team to integrate their own tools with SFOC tools to perform the tasks required to operate a spacecraft mission. This paper describes how the Magellan Spacecraft Team is utilizing the SFOC System in conjunction with their own software tools to perform the required tasks of spacecraft event monitoring as well as engineering data analysis and trending.

  16. Making surgical missions a joint operation: NGO experiences of visiting surgical teams and the formal health care system in Guatemala.

    PubMed

    Roche, Stephanie; Hall-Clifford, Rachel

    2015-01-01

    Each year, thousands of Guatemalans receive non-emergent surgical care from short-term medical missions (STMMs) hosted by local non-governmental organizations (NGOs) and staffed by foreign visiting medical teams (VMTs). The purpose of this study was to explore the perspectives of individuals based in NGOs involved in the coordination of surgical missions to better understand how these missions articulate with the larger Guatemalan health care system. During the summers of 2011 and 2013, in-depth interviews were conducted with 25 representatives from 11 different Guatemalan NGOs with experience with surgical missions. Transcripts were analysed for major themes using an inductive qualitative data analysis process. NGOs made use of the formal health care system but were limited by several factors, including cost, issues of trust and current ministry of health policy. Participants viewed the government health care system as a potential resource and expressed a desire for more collaboration. The current practices of STMMs are not conducive to health system strengthening. The role of STMMs must be defined and widely understood by all stakeholders in order to improve patient safety and effectively utilise health resources. Priority should be placed on aligning the work of VMTs with that of the larger health care system.

  17. Shared Leadership Improves Team Novelty: The Mechanism and Its Boundary Condition

    PubMed Central

    Sun, Xiaomin; Jie, Yuan; Wang, Yilu; Xue, Gang; Liu, Yan

    2016-01-01

    Previous research has revealed the significant impact of shared leadership on team creativity, yet the mechanism underlying this relationship has rarely been investigated. The current research examined how shared leadership influenced team creativity (novelty and usefulness) across 3 studies using both long-term project teams and temporal task teams in the laboratory. The results showed that shared leadership enhanced the novelty dimension of team creativity by improving constructive controversy. Furthermore, team goal orientation moderated this effect. The indirect effect of constructive controversy holds for teams with learning goal orientation but not for those with performance goal orientation. Such patterns were not found in the usefulness dimension of team creativity. PMID:28066289

  18. Improving Palliative Care Team Meetings: Structure, Inclusion, and "Team Care".

    PubMed

    Brennan, Caitlin W; Kelly, Brittany; Skarf, Lara Michal; Tellem, Rotem; Dunn, Kathleen M; Poswolsky, Sheila

    2016-07-01

    Increasing demands on palliative care teams point to the need for continuous improvement to ensure teams are working collaboratively and efficiently. This quality improvement initiative focused on improving interprofessional team meeting efficiency and subsequently patient care. Meeting start and end times improved from a mean of approximately 9 and 6 minutes late in the baseline period, respectively, to a mean of 4.4 minutes late (start time) and ending early in our sustainability phase. Mean team satisfaction improved from 2.4 to 4.5 on a 5-point Likert-type scale. The improvement initiative clarified communication about patients' plans of care, thus positively impacting team members' ability to articulate goals to other professionals, patients, and families. We propose several recommendations in the form of a team meeting "toolkit." © The Author(s) 2015.

  19. The DUNE Mission

    NASA Astrophysics Data System (ADS)

    Castander, F. J.

    The Dark UNiverse Explorer (DUNE) is a wide-field imaging mission concept whose primary goal is the study of dark energy and dark matter with unprecedented precision. To this end, DUNE is optimised for weak gravitational lensing, and also uses complementary cosmological probes, such as baryonic oscillations, the integrated Sachs-Wolf effect, and cluster counts. Besides its observational cosmology goals, the mission capabilities of DUNE allow the study of galaxy evolution, galactic structure and the demographics of Earth-mass planets. DUNE is a medium class mission consisting of a 1.2m telescope designed to carry out an all-sky survey in one visible and three NIR bands. The final data of the DUNE mission will form a unique legacy for the astronomy community. DUNE has been selected jointly with SPACE for an ESA Assessment phase which has led to the Euclid merged mission concept which combines wide-field deep imaging with low resolution multi-object spectroscopy.

  20. 12 CFR 1282.13 - Multifamily special affordable housing goal and subgoal.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 12 Banks and Banking 9 2012-01-01 2012-01-01 false Multifamily special affordable housing goal and... MISSION ENTERPRISE HOUSING GOALS AND MISSION Housing Goals § 1282.13 Multifamily special affordable housing goal and subgoal. (a) Multifamily housing goal and subgoal. An Enterprise shall be in compliance...

  1. 12 CFR 1282.13 - Multifamily special affordable housing goal and subgoal.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 7 2011-01-01 2011-01-01 false Multifamily special affordable housing goal and... MISSION ENTERPRISE HOUSING GOALS AND MISSION Housing Goals § 1282.13 Multifamily special affordable housing goal and subgoal. (a) Multifamily housing goal and subgoal. An Enterprise shall be in compliance...

  2. Outline of Infrared Space Astrometry missions:JASMINE

    NASA Astrophysics Data System (ADS)

    Gouda, N.

    2018-04-01

    Japanese group is promoting infrared space astrometry missions, JASMINE project series, in international collaboration with Gaia DPAC team. In this paper, the outline of Nano-JASMINE and Small-JASMINE missions is shown.

  3. STS-125 Flight Control Team in BFCR - HST Orbit & Planning Teams

    NASA Image and Video Library

    2009-05-18

    JSC2009-E-120479 (18 May 2009) --- Members of the STS-125 Hubble Space Telescope Planning and Orbit flight control team pose for a group portrait in the blue flight control room in the Mission Control Center at NASA's Johnson Space Center.

  4. STS-125 Flight Control Team in BFCR - HST Planning & Orbit Team

    NASA Image and Video Library

    2009-05-19

    JSC2009-E-120701 (19 May 2009) --- Members of the STS-125 Hubble Space Telescope Planning and Orbit flight control team pose for a group portrait in the blue flight control room in the Mission Control Center at NASA's Johnson Space Center.

  5. Lessons from a Space Analog on Adaptation for Long-Duration Exploration Missions.

    PubMed

    Anglin, Katlin M; Kring, Jason P

    2016-04-01

    Exploration missions to asteroids and Mars will bring new challenges associated with communication delays and more autonomy for crews. Mission safety and success will rely on how well the entire system, from technology to the human elements, is adaptable and resilient to disruptive, novel, or potentially catastrophic events. The recent NASA Extreme Environment Missions Operations (NEEMO) 20 mission highlighted this need and produced valuable "lessons learned" that will inform future research on team adaptation and resilience. A team of NASA, industry, and academic members used an iterative process to design a tripod shaped structure, called the CORAL Tower, for two astronauts to assemble underwater with minimal tools. The team also developed assembly procedures, administered training to the crew, and provided support during the mission. During the design, training, and assembly of the Tower, the team learned first-hand how adaptation in extreme environments depends on incremental testing, thorough procedures and contingency plans that predict possible failure scenarios, and effective team adaptation and resiliency for the crew and support personnel. Findings from NEEMO 20 provide direction on the design and testing process for future space systems and crews to maximize adaptation. This experience also underscored the need for more research on team adaptation, particularly how input and process factors affect adaption outcomes, the team adaptation iterative process, and new ways to measure the adaptation process.

  6. Automation and Process Improvement Enables a Small Team to Operate a Low Thrust Mission in Orbit Around the Asteroid Vesta

    NASA Technical Reports Server (NTRS)

    Weise, Timothy M

    2012-01-01

    NASA's Dawn mission to the asteroid Vesta and dwarf planet Ceres launched September 27, 2007 and arrived at Vesta in July of 2011. This mission uses ion propulsion to achieve the necessary delta-V to reach and maneuver at Vesta and Ceres. This paper will show how the evolution of ground system automation and process improvement allowed a relatively small engineering team to transition from cruise operations to asteroid operations while maintaining robust processes. The cruise to Vesta phase lasted almost 4 years and consisted of activities that were built with software tools, but each tool was open loop and required engineers to review the output to ensure consistency. Additionally, this same time period was characterized by the evolution from manually retrieved and reviewed data products to automatically generated data products and data value checking. Furthermore, the team originally took about three to four weeks to design and build about four weeks of spacecraft activities, with spacecraft contacts only once a week. Operations around the asteroid Vesta increased the tempo dramatically by transitioning from one contact a week to three or four contacts a week, to fourteen contacts a week (every 12 hours). This was accompanied by a similar increase in activity complexity as well as very fast turn around activity design and build cycles. The design process became more automated and the tools became closed loop, allowing the team to build more activities without sacrificing rigor. Additionally, these activities were dependent on the results of flight system performance, so more automation was added to analyze the flight data and provide results in a timely fashion to feed the design cycle. All of this automation and process improvement enabled up the engineers to focus on other aspects of spacecraft operations, including spacecraft health monitoring and anomaly resolution.

  7. Assessing performance in complex team environments.

    PubMed

    Whitmore, Jeffrey N

    2005-07-01

    This paper provides a brief introduction to team performance assessment. It highlights some critical aspects leading to the successful measurement of team performance in realistic console operations; discusses the idea of process and outcome measures; presents two types of team data collection systems; and provides an example of team performance assessment. Team performance assessment is a complicated endeavor relative to assessing individual performance. Assessing team performance necessitates a clear understanding of each operator's task, both at the individual and team level, and requires planning for efficient data capture and analysis. Though team performance assessment requires considerable effort, the results can be very worthwhile. Most tasks performed in Command and Control environments are team tasks, and understanding this type of performance is becoming increasingly important to the evaluation of mission success and for overall system optimization.

  8. Simulation and Analysis of Launch Teams (SALT)

    NASA Technical Reports Server (NTRS)

    2008-01-01

    A SALT effort was initiated in late 2005 with seed funding from the Office of Safety and Mission Assurance Human Factors organization. Its objectives included demonstrating human behavior and performance modeling and simulation technologies for launch team analysis, training, and evaluation. The goal of the research is to improve future NASA operations and training. The project employed an iterative approach, with the first iteration focusing on the last 70 minutes of a nominal-case Space Shuttle countdown, the second iteration focusing on aborts and launch commit criteria violations, the third iteration focusing on Ares I-X communications, and the fourth iteration focusing on Ares I-X Firing Room configurations. SALT applied new commercial off-the-shelf technologies from industry and the Department of Defense in the spaceport domain.

  9. The Final Count Down: A Review of Three Decades of Flight Controller Training Methods for Space Shuttle Mission Operations

    NASA Technical Reports Server (NTRS)

    Dittemore, Gary D.; Bertels, Christie

    2011-01-01

    Operations of human spaceflight systems is extremely complex, therefore the training and certification of operations personnel is a critical piece of ensuring mission success. Mission Control Center (MCC-H), at the Lyndon B. Johnson Space Center, in Houston, Texas manages mission operations for the Space Shuttle Program, including the training and certification of the astronauts and flight control teams. As the space shuttle program ends in 2011, a review of how training for STS-1 was conducted compared to STS-134 will show multiple changes in training of shuttle flight controller over a thirty year period. This paper will additionally give an overview of a flight control team s makeup and responsibilities during a flight, and details on how those teams have been trained certified over the life span of the space shuttle. The training methods for developing flight controllers have evolved significantly over the last thirty years, while the core goals and competencies have remained the same. In addition, the facilities and tools used in the control center have evolved. These changes have been driven by many factors including lessons learned, technology, shuttle accidents, shifts in risk posture, and generational differences. A primary method used for training Space Shuttle flight control teams is by running mission simulations of the orbit, ascent, and entry phases, to truly "train like you fly." The reader will learn what it is like to perform a simulation as a shuttle flight controller. Finally, the paper will reflect on the lessons learned in training for the shuttle program, and how those could be applied to future human spaceflight endeavors.

  10. Creating Teams Increases Extension Educator Productivity

    ERIC Educational Resources Information Center

    Chalker-Scott, Linda; Daniels, Catherine H.; Martini, Nicole

    2016-01-01

    The Garden Team at Washington State University is a transdisciplinary group of faculty, staff, and students with expertise in applied plant and soil sciences and an interest in Extension education. The team's primary mission is to create current, relevant, and peer-reviewed materials as Extension publications for home gardeners. The average yearly…

  11. Rosetta mission operations for landing

    NASA Astrophysics Data System (ADS)

    Accomazzo, Andrea; Lodiot, Sylvain; Companys, Vicente

    2016-08-01

    The International Rosetta Mission of the European Space Agency (ESA) was launched on 2nd March 2004 on its 10 year journey to comet Churyumov-Gerasimenko and has reached it early August 2014. The main mission objectives were to perform close observations of the comet nucleus throughout its orbit around the Sun and deliver the lander Philae to its surface. This paper describers the activities at mission operations level that allowed the landing of Philae. The landing preparation phase was mainly characterised by the definition of the landing selection process, to which several parties contributed, and by the definition of the strategy for comet characterisation, the orbital strategy for lander delivery, and the definition and validation of the operations timeline. The definition of the landing site selection process involved almost all components of the mission team; Rosetta has been the first, and so far only mission, that could not rely on data collected by previous missions for the landing site selection. This forced the teams to include an intensive observation campaign as a mandatory part of the process; several science teams actively contributed to this campaign thus making results from science observations part of the mandatory operational products. The time allocated to the comet characterisation phase was in the order of a few weeks and all the processes, tools, and interfaces required an extensive planning an validation. Being the descent of Philae purely ballistic, the main driver for the orbital strategy was the capability to accurately control the position and velocity of Rosetta at Philae's separation. The resulting operations timeline had to merge this need of frequent orbit determination and control with the complexity of the ground segment and the inherent risk of problems when doing critical activities in short times. This paper describes the contribution of the Mission Control Centre (MOC) at the European Space Operations Centre (ESOC) to this

  12. An Internet Protocol-Based Software System for Real-Time, Closed-Loop, Multi-Spacecraft Mission Simulation Applications

    NASA Technical Reports Server (NTRS)

    Davis, George; Cary, Everett; Higinbotham, John; Burns, Richard; Hogie, Keith; Hallahan, Francis

    2003-01-01

    The paper will provide an overview of the web-based distributed simulation software system developed for end-to-end, multi-spacecraft mission design, analysis, and test at the NASA Goddard Space Flight Center (GSFC). This software system was developed for an internal research and development (IR&D) activity at GSFC called the Distributed Space Systems (DSS) Distributed Synthesis Environment (DSE). The long-term goal of the DSS-DSE is to integrate existing GSFC stand-alone test beds, models, and simulation systems to create a "hands on", end-to-end simulation environment for mission design, trade studies and simulations. The short-term goal of the DSE was therefore to develop the system architecture, and then to prototype the core software simulation capability based on a distributed computing approach, with demonstrations of some key capabilities by the end of Fiscal Year 2002 (FY02). To achieve the DSS-DSE IR&D objective, the team adopted a reference model and mission upon which FY02 capabilities were developed. The software was prototyped according to the reference model, and demonstrations were conducted for the reference mission to validate interfaces, concepts, etc. The reference model, illustrated in Fig. 1, included both space and ground elements, with functional capabilities such as spacecraft dynamics and control, science data collection, space-to-space and space-to-ground communications, mission operations, science operations, and data processing, archival and distribution addressed.

  13. Using Simulation for Launch Team Training and Evaluation

    NASA Technical Reports Server (NTRS)

    Peaden, Cary J.

    2005-01-01

    This document describes some of the histor y and uses of simulation systems and processes for the training and evaluation of Launch Processing, Mission Control, and Mission Management teams. It documents some of the types of simulations that are used at Kennedy Space Center (KSC) today and that could be utilized (and possibly enhanced) for future launch vehicles. This article is intended to provide an initial baseline for further research into simulation for launch team training in the near future.

  14. Decentralized formation flying control in a multiple-team hierarchy.

    PubMed

    Mueller, Joseph B; Thomas, Stephanie J

    2005-12-01

    In recent years, formation flying has been recognized as an enabling technology for a variety of mission concepts in both the scientific and defense arenas. Examples of developing missions at NASA include magnetospheric multiscale (MMS), solar imaging radio array (SIRA), and terrestrial planet finder (TPF). For each of these missions, a multiple satellite approach is required in order to accomplish the large-scale geometries imposed by the science objectives. In addition, the paradigm shift of using a multiple satellite cluster rather than a large, monolithic spacecraft has also been motivated by the expected benefits of increased robustness, greater flexibility, and reduced cost. However, the operational costs of monitoring and commanding a fleet of close-orbiting satellites is likely to be unreasonable unless the onboard software is sufficiently autonomous, robust, and scalable to large clusters. This paper presents the prototype of a system that addresses these objectives-a decentralized guidance and control system that is distributed across spacecraft using a multiple team framework. The objective is to divide large clusters into teams of "manageable" size, so that the communication and computation demands driven by N decentralized units are related to the number of satellites in a team rather than the entire cluster. The system is designed to provide a high level of autonomy, to support clusters with large numbers of satellites, to enable the number of spacecraft in the cluster to change post-launch, and to provide for on-orbit software modification. The distributed guidance and control system will be implemented in an object-oriented style using a messaging architecture for networking and threaded applications (MANTA). In this architecture, tasks may be remotely added, removed, or replaced post launch to increase mission flexibility and robustness. This built-in adaptability will allow software modifications to be made on-orbit in a robust manner. The

  15. An Engineering Design Reference Mission for a Future Large-Aperture UVOIR Space Observatory

    NASA Astrophysics Data System (ADS)

    Thronson, Harley A.; Bolcar, Matthew R.; Clampin, Mark; Crooke, Julie A.; Redding, David; Rioux, Norman; Stahl, H. Philip

    2016-01-01

    From the 2010 NRC Decadal Survey and the NASA Thirty-Year Roadmap, Enduring Quests, Daring Visions, to the recent AURA report, From Cosmic Birth to Living Earths, multiple community assessments have recommended development of a large-aperture UVOIR space observatory capable of achieving a broad range of compelling scientific goals. Of these priority science goals, the most technically challenging is the search for spectroscopic biomarkers in the atmospheres of exoplanets in the solar neighborhood. Here we present an engineering design reference mission (EDRM) for the Advanced Technology Large-Aperture Space Telescope (ATLAST), which was conceived from the start as capable of breakthrough science paired with an emphasis on cost control and cost effectiveness. An EDRM allows the engineering design trade space to be explored in depth to determine what are the most demanding requirements and where there are opportunities for margin against requirements. Our joint NASA GSFC/JPL/MSFC/STScI study team has used community-provided science goals to derive mission needs, requirements, and candidate mission architectures for a future large-aperture, non-cryogenic UVOIR space observatory. The ATLAST observatory is designed to operate at a Sun-Earth L2 orbit, which provides a stable thermal environment and excellent field of regard. Our reference designs have emphasized a serviceable 36-segment 9.2 m aperture telescope that stows within a five-meter diameter launch vehicle fairing. As part of our cost-management effort, this particular reference mission builds upon the engineering design for JWST. Moreover, it is scalable to a variety of launch vehicle fairings. Performance needs developed under the study are traceable to a variety of additional reference designs, including options for a monolithic primary mirror.

  16. User evaluation of a GUI for controlling an autonomous persistent surveillance team

    NASA Astrophysics Data System (ADS)

    Scerri, Paul; Owens, Sean; Sycara, Katia; Lewis, Michael

    2010-04-01

    In future military missions, there will be many sensor assets collecting much important information about the environment. User control over surveillance assets is important to ensure that the specific data collected is appropriate for the current mission. Unfortunately, previous work has shown that individual users cannot effectively control more than about four assets, even if the assets have significant autonomy. In the ACCAST project, we hypothesized that by including autonomous teamwork between the assets and allowing users to interact by describing what the team as a whole and specific sub-teams should do, we could dramatically scale up the number of assets an individual user could effectively control. In this paper, we present the results of an experiment where users controlled up to 30 autonomous assets performing a complex mission. The assets autonomously worked together using sophisticated teamwork and the user could tell sub-teams to execute team oriented plans which described the steps required to achieve a team objective without describing exactly which asset performed which role and without having to specify how the team should handle routine information sharing, communications and failure circumstances. The users, soldiers from Fort Benning, were surprisingly good at managing the assets and were all able to complete the complex mission with extremely low friendly and civilian casualties.

  17. Cassini End of Mission Press Conference

    NASA Image and Video Library

    2017-09-15

    Cassini program manager at JPL, Earl Maize, left, Cassini project scientist at JPL, Linda Spilker, center, spacecraft operations team manager for the Cassini mission at Saturn, Julie Webster, right, answer questions from the media during a press conference held after the end of the Cassini mission, Friday, Sept. 15, 2017 at NASA's Jet Propulsion Laboratory in Pasadena, California. Since its arrival in 2004, the Cassini-Huygens mission has been a discovery machine, revolutionizing our knowledge of the Saturn system and captivating us with data and images never before obtained with such detail and clarity. On Sept. 15, 2017, operators deliberately plunged the spacecraft into Saturn, as Cassini gathered science until the end. Loss of contact with the Cassini spacecraft occurred at 7:55 a.m. EDT (4:55 a.m. PDT). The “plunge” ensures Saturn’s moons will remain pristine for future exploration. During Cassini’s final days, mission team members from all around the world gathered at NASA’s Jet Propulsion Laboratory, Pasadena, California, to celebrate the achievements of this historic mission. Photo Credit: (NASA/Joel Kowsky)

  18. NASA Mission: The Universe

    NASA Technical Reports Server (NTRS)

    1990-01-01

    This booklet is mainly a recruitment tool for the various NASA Centers. This well illustrated booklet briefly describes NASA's mission and career opportunities on the NASA team. NASA field installations and their missions are briefly noted. NASA's four chief program offices are briefly described. They are: (1) Aeronautics, Exploration, and Space Technology; (2) Space Flight; (3) Space Operations; and (4) Space Science and Applications.

  19. Training forward surgical teams for deployment: the US Army Trauma Training Center.

    PubMed

    Valdiri, Linda A; Andrews-Arce, Virginia E; Seery, Jason M

    2015-04-01

    Since the late 1980s, the US Army has been deploying forward surgical teams to the most intense areas of conflict to care for personnel injured in combat. The forward surgical team is a 20-person medical team that is highly mobile, extremely agile, and has relatively little need of outside support to perform its surgical mission. In order to perform this mission, however, team training and trauma training are required. The large majority of these teams do not routinely train together to provide patient care, and that training currently takes place at the US Army Trauma Training Center (ATTC). The training staff of the ATTC is a specially selected 10-person team made up of active duty personnel from the Army Medical Department assigned to the University of Miami/Jackson Memorial Hospital Ryder Trauma Center in Miami, Florida. The ATTC team of instructors trains as many as 11 forward surgical teams in 2-week rotations per year so that the teams are ready to perform their mission in a deployed setting. Since the first forward surgical team was trained at the ATTC in January 2002, more than 112 forward surgical teams and other similar-sized Department of Defense forward resuscitative and surgical units have rotated through trauma training at the Ryder Trauma Center in preparation for deployment overseas. ©2015 American Association of Critical-Care Nurses.

  20. Implementing Distributed Operations: A Comparison of Two Deep Space Missions

    NASA Technical Reports Server (NTRS)

    Mishkin, Andrew; Larsen, Barbara

    2006-01-01

    Two very different deep space exploration missions--Mars Exploration Rover and Cassini--have made use of distributed operations for their science teams. In the case of MER, the distributed operations capability was implemented only after the prime mission was completed, as the rovers continued to operate well in excess of their expected mission lifetimes; Cassini, designed for a mission of more than ten years, had planned for distributed operations from its inception. The rapid command turnaround timeline of MER, as well as many of the operations features implemented to support it, have proven to be conducive to distributed operations. These features include: a single science team leader during the tactical operations timeline, highly integrated science and engineering teams, processes and file structures designed to permit multiple team members to work in parallel to deliver sequencing products, web-based spacecraft status and planning reports for team-wide access, and near-elimination of paper products from the operations process. Additionally, MER has benefited from the initial co-location of its entire operations team, and from having a single Principal Investigator, while Cassini operations have had to reconcile multiple science teams distributed from before launch. Cassini has faced greater challenges in implementing effective distributed operations. Because extensive early planning is required to capture science opportunities on its tour and because sequence development takes significantly longer than sequence execution, multiple teams are contributing to multiple sequences concurrently. The complexity of integrating inputs from multiple teams is exacerbated by spacecraft operability issues and resource contention among the teams, each of which has their own Principal Investigator. Finally, much of the technology that MER has exploited to facilitate distributed operations was not available when the Cassini ground system was designed, although later adoption

  1. A Venus Flagship Mission: Exploring a World of Contrasts

    NASA Astrophysics Data System (ADS)

    Senske, D.; Bullock, M.; Balint, T.; Benz, A.; Campbell, B.; Chassefiere, E.; Colaprete, A.; Cutts, J.; Glaze, L.; Gorevan, S.; Grinspoon, D.; Hall, J.; Hasimoto, G.; Head, J.; Hunter, G.; Johnson, N.; Kiefer, W.; Kolawa, E.; Kremic, T.; Kwok, J.; Limaye, S.; Mackwell, S.; Marov, M.; Peterson, C.; Schubert, G.; Spilker, T.; Stofan, E.; Svedhem, H.; Titov, D.; Treiman, A.

    2008-12-01

    Results from past missions and the current Venus Express Mission show that Venus is a world of contrasts, providing clear science drivers for renewed exploration of this planet. In early 2008, NASA's Science Mission Directorate formed a Science and Technology Definition Team (STDT) to formulate science goals and objectives, mission architecture and a technology roadmap for a flagship class mission to Venus. This 3- to 4 billon mission, to launch in the post 2020 timeframe, should revolutionize our understanding of how climate works on terrestrial planets, including the close relationship between volcanism, tectonism, the interior, and the atmosphere. It would also more clearly elucidate the geologic history of Venus, including the existence and persistence of an ancient ocean. Achieving these objectives will provide a basis to understand the habitability of extra solar terrestrial planets. To address a broad range of science questions this mission will be composed of flight elements that include an orbiter that is highlighted by an interferometric SAR to provide surface topographic and image information at scales one to two orders of magnitude greater than that achieved by any previous spacecraft to Venus. Two balloons with a projected lifetime of weeks will probe the structure and dynamics of the atmosphere at an altitude of 50 to 70-km. In addition, two descent probes will collect data synergistic to that from the balloon and analyze the geochemistry of surface rocks over a period of hours. The technology road map focuses on key areas of science instruments and enabling engineering to provide greater in situ longevity in the hostile Venus environment.

  2. Overview of the Neurolab Spacelab mission

    NASA Technical Reports Server (NTRS)

    Homick, J. L.; Delaney, P.; Rodda, K.

    1998-01-01

    Neurolab is a NASA Spacelab mission with multinational cooperative participation that is dedicated to research on the nervous system. The nervous systems of all animal species have evolved in a one-g environment and are functionally influenced by the presence of gravity. The absence of gravity presents a unique opportunity to gain new insights into basic neurologic functions as well as an enhanced understanding of physiological and behavioral responses mediated by the nervous system. The primary goal of Neurolab is to expand our understanding of how the nervous system develops, functions in, and adapts to microgravity space flight. Twenty-six peer reviewed investigations using human and nonhuman test subjects were assigned to one of eight science discipline teams. Individual and integrated experiments within these teams have been designed to collect a wide range of physiological and behavior data in flight as well as pre- and postflight. Information from these investigations will be applicable to enhancing the well being and performance of future long duration space travelers, will contribute to our understanding of normal and pathological functioning of the nervous system, and may be applied by the medical community to enhance the health of humans on Earth.

  3. FY15 Gravitational-Wave Mission Activities Project

    NASA Technical Reports Server (NTRS)

    Stebbins, Robin T.

    2014-01-01

    The Gravitational-Wave (GW) team at Goddard provides leadership to both the US and international research communities through science and conceptual design competencies. To sustain the US effort to either participate in the GW mission that ESA selected for the L3 opportunity or to initiate a NASA-led mission, the Goddard team will engage in the advancement of the science and the conceptual design of a future GW mission. We propose two tasks: (1) deliver new theoretical tools to help the external research community understand how GW observations can contribute to their science and (2) explore new implementations for laser metrology systems based on techniques from time-domain reflectometry and laser communications.

  4. The Right Stuff: A Look Back at Three Decades of Flight Controller Training for Space Shuttle Mission Operations

    NASA Technical Reports Server (NTRS)

    Dittemore, Gary D.

    2011-01-01

    Operations of human spaceflight systems is extremely complex, therefore the training and certification of operations personnel is a critical piece of ensuring mission success. Mission Control Center (MCC-H), at the Lyndon B. Johnson Space Center, in Houston, Texas manages mission operations for the Space Shuttle Program, including the training and certification of the astronauts and flight control teams. This paper will give an overview of a flight control team s makeup and responsibilities during a flight, and details on how those teams are trained and certified. The training methodology for developing flight controllers has evolved significantly over the last thirty years, while the core goals and competencies have remained the same. In addition, the facilities and tools used in the control center have evolved. These changes have been driven by many factors including lessons learned, technology, shuttle accidents, shifts in risk posture, and generational differences. Flight controllers will share their experiences in training and operating the Space Shuttle throughout the Program s history. A primary method used for training Space Shuttle flight control teams is by running mission simulations of the orbit, ascent, and entry phases, to truly "train like you fly." The reader will learn what it is like to perform a simulation as a shuttle flight controller. Finally, the paper will reflect on the lessons learned in training for the shuttle program, and how those could be applied to future human spaceflight endeavors. These endeavors could range from going to the moon or to Mars. The lessons learned from operating the space shuttle for over thirty years will help the space industry build the next human transport space vehicle and inspire the next generation of space explorers.

  5. Parker Solar Probe: A NASA Mission to Touch the Sun: Mission Status Update

    NASA Astrophysics Data System (ADS)

    Fox, N. J.

    2017-12-01

    The newly renamed, Parker Solar Probe (PSP) mission will be the first mission to fly into the low solar corona, revealing how the corona is heated and the solar wind and energetic particles are accelerated, solving fundamental mysteries that have been top priority science goals since such a mission was first proposed in 1958. The scale and concept of such a mission has been revised at intervals since that time, yet the core has always been a close encounter with the Sun. The primary science goal of the Parker Solar Probe mission is to determine the structure and dynamics of the Sun's coronal magnetic field, understand how the solar corona and wind are heated and accelerated, and determine what mechanisms accelerate and transport energetic particles. PSP uses an innovative mission design, significant technology development and a risk-reducing engineering development to meet the science objectives. In this presentation, we provide an update on the progress of the Parker Solar Probe mission as we prepare for the July 2018 launch.

  6. Catalog of Viking mission data

    NASA Technical Reports Server (NTRS)

    Vostreys, R. W. (Editor)

    1978-01-01

    This catalog announces the present/expected availability of scientific data acquired by the Viking missions and contains descriptions of the Viking spacecraft, experiments, and data sets. An index is included listing the team leaders and team members for the experiments. Information on NSSDC facilities and ordering procedures, and a list of acronyms and abbreviations are included in the appendices.

  7. The Extended Duration Sounding Rocket (EDSR): Low Cost Science and Technology Missions

    NASA Astrophysics Data System (ADS)

    Cruddace, R. G.; Chakrabarti, S.; Cash, W.; Eberspeaker, P.; Figer, D.; Figueroa, O.; Harris, W.; Kowalski, M.; Maddox, R.; Martin, C.; McCammon, D.; Nordsieck, K.; Polidan, R.; Sanders, W.; Wilkinson, E.; Asrat

    2011-12-01

    The 50-year old NASA sounding rocket (SR) program has been successful in launching scientific payloads into space frequently and at low cost with a 85% success rate. In 2008 the NASA Astrophysics Sounding Rocket Assessment Team (ASRAT), set up to review the future course of the SR program, made four major recommendations, one of which now called Extended Duration Sounding Rocket (EDSR). ASRAT recommended a system capable of launching science payloads (up to 420 kg) into low Earth orbit frequently (1/yr) at low cost, with a mission duration of approximately 30 days. Payload selection would be based on meritorious high-value science that can be performed by migrating sub-orbital payloads to orbit. Establishment of this capability is a essential for NASA as it strives to advance technical readiness and lower costs for risk averse Explorers and flagship missions in its pursuit of a balanced and sustainable program and achieve big science goals within a limited fiscal environment. The development of a new generation of small, low-cost launch vehicles (SLV), primarily the SpaceX Falcon 1 and the Orbital Sciences Minotaur I has made this concept conceivable. The NASA Wallops Flight Facility (WFF)conducted a detailed engineering concept study, aimed at defining the technical characteristics of all phases of a mission, from design, procurement, assembly, test, integration and mission operations. The work was led by Dr. Raymond Cruddace, a veteran of the SR program and the prime mover of the EDSR concept. The team investigated details such as, the "FAA licensed contract" for launch service procurement, with WFF and NASA SMD being responsible for mission assurance which results in a factor of two cost savings over the current approach. These and other creative solutions resulted in a proof-of-concept Class D mission design that could have a sustained launch rate of at least 1/yr, a mission duration of up to about 3 months, and a total cost of $25-30 million for each mission

  8. The Generation-X Vision Mission Study and Advanced Mission Concept

    NASA Astrophysics Data System (ADS)

    Brissenden, Roger J. V.; Generation-X Team

    2008-03-01

    The Generation-X (Gen-X) mission was selected as one of NASA's Vision Missions as a concept for a next generation X-ray telescope designed to study the very early universe with 1000-times greater sensitivity than current X-ray telescopes. The mission has also been proposed as an Advanced Mission Concept Study (AMCS) to further define the technology development plan and mission design. The scientific goals for Gen-X include studying the first generations of stars and black holes in the epoch z=10-20, the evolution of black holes and galaxies from high z to the present, the chemical evolution of the universe and the properties of matter under extreme conditions. The key parameters required to meet these goals define a challenging mission and include an effective area of 50 m2 at 1 keV, and an angular resolution (HPD) of 0.1 arcsec over an energy band of 0.1-10 keV. The required effective area implies that extremely lightweight grazing incidence X-ray optics must be developed. To achieve the required areal density of at least 100 times lower than in Chandra, thin ( 0.1 mm) mirrors that have active on-orbit figure control are required. We present the major findings from the Gen-X Vision Mission Study and a streamlined mission concept enabled by the Ares V launch capability, as proposed in response to the AMSC call.

  9. Design Description for Team-Based Execution of Autonomous Missions (TEAM), Spiral 1

    DTIC Science & Technology

    2008-11-18

    TEAM), Spiral 1 Doc. #: Version: 1.0 Date: November 18, 2008 Page 12 of 39 Visualization Framework (WorldWind) Hibernate / Hibernate ...Spatial hibernate -properties XML Mapping WCS WFSWMS Enterprise Service Bus (Mule) Messaging, Data Transformation, Intelligent Routing Workflow Engine...government selected solutions. Neither these nor Mule® are deliverable, but the government may opt to use them if it so chooses. jBPM, java Business

  10. Team Composition Issues for Future Space Exploration: A Review and Directions for Future Research.

    PubMed

    Bell, Suzanne T; Brown, Shanique G; Abben, Daniel R; Outland, Neal B

    2015-06-01

    Future space exploration, such as a mission to Mars, will require space crews to live and work in extreme environments unlike those of previous space missions. Extreme conditions such as prolonged confinement, isolation, and expected communication time delays will require that crews have a higher level of interpersonal compatibility and be able to work autonomously, adapting to unforeseen challenges in order to ensure mission success. Team composition, or the configuration of member attributes, is an important consideration for maximizing crewmember well-being and team performance. We conducted an extensive search to find articles about team composition in long-distance space exploration (LDSE)-analogue environments, including a search of databases, specific relevant journals, and by contacting authors who publish in the area. We review the team composition research conducted in analogue environments in terms of two paths through which team composition is likely to be related to LDSE mission success, namely by 1) affecting social integration, and 2) the team processes and emergent states related to team task completion. Suggestions for future research are summarized as: 1) the need to identify ways to foster unit-level social integration within diverse crews; 2) the missed opportunity to use team composition variables as a way to improve team processes, emergent states, and task completion; and 3) the importance of disentangling the effect of specific team composition variables to determine the traits (e.g., personality, values) that are associated with particular risks (e.g., subgrouping) to performance.

  11. MISSION: Mission and Safety Critical Support Environment. Executive overview

    NASA Technical Reports Server (NTRS)

    Mckay, Charles; Atkinson, Colin

    1992-01-01

    For mission and safety critical systems it is necessary to: improve definition, evolution and sustenance techniques; lower development and maintenance costs; support safe, timely and affordable system modifications; and support fault tolerance and survivability. The goal of the MISSION project is to lay the foundation for a new generation of integrated systems software providing a unified infrastructure for mission and safety critical applications and systems. This will involve the definition of a common, modular target architecture and a supporting infrastructure.

  12. Usage of Multi-Mission Radioisotope Thermoelectric Generators (MMRTGs) for Future Potential Missions

    NASA Technical Reports Server (NTRS)

    Zakrajsek, June F.; Cairns-Gallimore, Dirk; Otting, Bill; Johnson, Steve; Woerner, Dave

    2016-01-01

    The goal of NASAs Radioisotope Power Systems (RPS) Program is to make RPS ready and available to support the exploration of the solar system in environments where the use of conventional solar or chemical power generation is impractical or impossible to meet the needs of the missions. To meet this goal, the RPS Program, working closely with the Department of Energy, performs mission and system studies (such as the recently released Nuclear Power Assessment Study), evaluates the readiness of promising technologies to infuse in future generators, assesses the sustainment of key RPS capabilities and knowledge, forecasts and tracks the Programs budgetary needs, and disseminates current information about RPS to the community of potential users. This presentation focuses on the needs of the mission community and provides users a better understanding of how to integrate the MMRTG (Multi-Mission Radioisotope Thermoelectric Generator).

  13. Entrepreneurial Thinking in Interdisciplinary Student Teams

    ERIC Educational Resources Information Center

    Neumeyer, Xaver; McKenna, Ann

    2016-01-01

    Our work investigates students' perception of collaborative expertise and the role of inquiry-based learning in the context of team-based entrepreneurship education. Specifically, we examine students' perception of communication, division of work, shared goals, team conflicts and leadership in their respective teams. In addition, we look at the…

  14. GeoLab: A Geological Workstation for Future Missions

    NASA Technical Reports Server (NTRS)

    Evans, Cynthia; Calaway, Michael; Bell, Mary Sue; Li, Zheng; Tong, Shuo; Zhong, Ye; Dahiwala, Ravi

    2014-01-01

    The GeoLab glovebox was, until November 2012, fully integrated into NASA's Deep Space Habitat (DSH) Analog Testbed. The conceptual design for GeoLab came from several sources, including current research instruments (Microgravity Science Glovebox) used on the International Space Station, existing Astromaterials Curation Laboratory hardware and clean room procedures, and mission scenarios developed for earlier programs. GeoLab allowed NASA scientists to test science operations related to contained sample examination during simulated exploration missions. The team demonstrated science operations that enhance theThe GeoLab glovebox was, until November 2012, fully integrated into NASA's Deep Space Habitat (DSH) Analog Testbed. The conceptual design for GeoLab came from several sources, including current research instruments (Microgravity Science Glovebox) used on the International Space Station, existing Astromaterials Curation Laboratory hardware and clean room procedures, and mission scenarios developed for earlier programs. GeoLab allowed NASA scientists to test science operations related to contained sample examination during simulated exploration missions. The team demonstrated science operations that enhance the early scientific returns from future missions and ensure that the best samples are selected for Earth return. The facility was also designed to foster the development of instrument technology. Since 2009, when GeoLab design and construction began, the GeoLab team [a group of scientists from the Astromaterials Acquisition and Curation Office within the Astromaterials Research and Exploration Science (ARES) Directorate at JSC] has progressively developed and reconfigured the GeoLab hardware and software interfaces and developed test objectives, which were to 1) determine requirements and strategies for sample handling and prioritization for geological operations on other planetary surfaces, 2) assess the scientific contribution of selective in-situ sample

  15. Does the NASA Constellation Architecture Offer Opportunities to Achieve Multiple Additional Goals in Space?

    NASA Technical Reports Server (NTRS)

    Thronson, Harley; Lester, Daniel

    2008-01-01

    Every major NASA human spaceflight program in the last four decades has been modified to achieve goals in space not incorporated within the original design goals: the Apollo Applications Program, Skylab, Space Shuttle, and International Space Station. Several groups in the U.S. have been identifying major future science goals, the science facilities necessary to investigate them, as well as possible roles for augmented versions of elements of NASA's Constellation program. Specifically, teams in the astronomy community have been developing concepts for very capable missions to follow the James Webb Space Telescope that could take advantage of - or require - free-space operations by astronauts and/or robots. Taking as one example, the Single-Aperture Far-InfraRed (SAFIR) telescope with a 10+ m aperture proposed for operation in the 2020 timeframe. According to current NASA plans, the Ares V launch vehicle (or a variant) will be available about the same time, as will the capability to transport astronauts to the vicinity of the Moon via the Orion Crew Exploration Vehicle and associated systems. [As the lunar surface offers no advantages - and major disadvantages - for most major optical systems, the expensive system for landing and operating on the lunar surface is not required.] Although as currently conceived, SAFIR and other astronomical missions will operate at the Sun-Earth L2 location, it appears trivial to travel for servicing to the more accessible Earth-Moon L1,2 locations. Moreover, as the recent Orbital Express and Automated Transfer Vehicle Missions have demonstrated, future robotic capabilities should offer capabilities that would (remotely) extend human presence far beyond the vicinity of the Earth.

  16. Teamwork and collaboration in long-duration space missions: Going to extremes.

    PubMed

    Landon, Lauren Blackwell; Slack, Kelley J; Barrett, Jamie D

    2018-01-01

    The scientific study of teamwork in the context of spaceflight has uncovered a considerable amount of knowledge over the past 20 years. Although much is known about the underlying factors and processes of teamwork, much is left to be discovered for teams who will be operating in extreme isolation and confinement during a future Mars mission. Special considerations must be made to enhance teamwork and team well-being for multi-year missions during which the small team will live and work together. We discuss the unique challenges of effective teamwork in a Mars mission scenario, and the difficulties of studying teamwork using analogs of the space environment. We then describe the National Aeronautics and Space Administration's current practices and research on teamwork, which includes team selection and composition, teamwork training, countermeasures to mitigate risks to effective team performance, and the measurement and monitoring of team functioning. We end with a discussion of the teamwork research areas that are most critical for a successful journey to Mars. (PsycINFO Database Record (c) 2018 APA, all rights reserved).

  17. Spacelab life sciences 2 post mission report

    NASA Technical Reports Server (NTRS)

    Buckey, Jay C.

    1994-01-01

    Jay C. Buckey, M.D., Assistant Professor of Medicine at The University of Texas Southwestern Medical Center at Dallas served as an alternate payload specialist astronaut for the Spacelab Life Sciences 2 Space Shuttle Mission from January 1992 through December 1993. This report summarizes his opinions on the mission and offers suggestions in the areas of selection, training, simulations, baseline data collection and mission operations. The report recognizes the contributions of the commander, payload commander and mission management team to the success of the mission. Dr. Buckey's main accomplishments during the mission are listed.

  18. The Importance of Team Sex Composition in Team-Training Research Employing Complex Psychomotor Tasks.

    PubMed

    Jarrett, Steven M; Glaze, Ryan M; Schurig, Ira; Arthur, Winfred

    2017-08-01

    The relationship between team sex composition and team performance on a complex psychomotor task was examined because these types of tasks are commonly used in the lab-based teams literature. Despite well-documented sex-based differences on complex psychomotor tasks, the preponderance of studies-mainly lab based-that use these tasks makes no mention of the sex composition of teams across or within experimental conditions. A sample of 123 four-person teams with varying team sex composition learned and performed a complex psychomotor task, Steal Beasts Pro PE. Each team completed a 5-hr protocol whereby they conducted several performance missions. The results indicated significant large mean differences such that teams with larger proportions of males had higher performance scores. These findings demonstrate the potential effect of team sex composition on the validity of studies that use complex psychomotor tasks to explore and investigate team performance-related phenomena when (a) team sex composition is not a focal variable of interest and (b) it is not accounted for or controlled. Given the proclivity of complex psychomotor action-based tasks used in lab-based team studies, it is important to understand and control for the impact of team sex composition on team performance. When team sex composition is not controlled for, either methodologically or statistically, it may affect the validity of the results in teams studies using these types of tasks.

  19. Understanding Diversity in Educational Psychology Teams

    ERIC Educational Resources Information Center

    Annan, Jean; Bowler, Jo; Mentis, Mandia; Phillipson, Roger

    2008-01-01

    Educational psychologists' work routinely involves facilitation of teams in which participants hold diverse points of view. In this article, the authors discuss diversity in team work and its place in the development of shared goals. They describe, as an example of educational psychologists' work team interaction, the structure and functioning of…

  20. Reducing the Risk of Human Missions to Mars Through Testing

    NASA Astrophysics Data System (ADS)

    Drake, Bret G.

    2007-07-01

    During the summer of 2002 the NASA Deputy Administrator charted an internal NASA planning group to develop the rationale for exploration beyond low-Earth orbit. This team, termed the Exploration Blueprint, performed architecture analyses to develop roadmaps for how to accomplish the first steps beyond Low-Earth Orbit through the human exploration of Mars. The previous NASA Exploration Team (NEXT) activities laid the foundation and framework for development of NASA s Integrated Space Plan. The reference missions resulting from the analysis performed by the Exploration Blueprint team formed the basis for requirement definition, systems development, technology roadmapping, and risk assessments for future human exploration beyond low-Earth orbit. Emphasis was placed on developing recommendations on what could be done now to effect future exploration activities. The Exploration Blueprint team embraced the Stepping Stone approach to exploration where human and robotic activities are conducted through progressive expansion outward beyond low- Earth orbit. Results from this study produced a long-term strategy for exploration with near-term implementation plans, program recommendations, and technology investments. Specific results included the development of a common exploration crew vehicle concept, a unified space nuclear strategy, focused bioastronautics research objectives, and an integrated human and robotic exploration strategy. Recommendations from the Exploration Blueprint included the endorsement of the Nuclear Systems Initiative, augmentation of the bioastronautics research, a focused space transportation program including heavy-lift launch and a common exploration vehicle design for ISS and exploration missions, as well as an integrated human and robotic exploration strategy for Mars. Following the results of the Exploration Blueprint study, the NASA Administrator has asked for a recommendation by June, 2003 on the next steps in human and robotic exploration in

  1. Reducing the Risk of Human Missions to Mars Through Testing

    NASA Technical Reports Server (NTRS)

    Drake, Bret G.

    2007-01-01

    During the summer of 2002 the NASA Deputy Administrator charted an internal NASA planning group to develop the rationale for exploration beyond low-Earth orbit. This team, termed the Exploration Blueprint, performed architecture analyses to develop roadmaps for how to accomplish the first steps beyond Low-Earth Orbit through the human exploration of Mars. The previous NASA Exploration Team (NEXT) activities laid the foundation and framework for development of NASA s Integrated Space Plan. The reference missions resulting from the analysis performed by the Exploration Blueprint team formed the basis for requirement definition, systems development, technology roadmapping, and risk assessments for future human exploration beyond low-Earth orbit. Emphasis was placed on developing recommendations on what could be done now to effect future exploration activities. The Exploration Blueprint team embraced the Stepping Stone approach to exploration where human and robotic activities are conducted through progressive expansion outward beyond low- Earth orbit. Results from this study produced a long-term strategy for exploration with near-term implementation plans, program recommendations, and technology investments. Specific results included the development of a common exploration crew vehicle concept, a unified space nuclear strategy, focused bioastronautics research objectives, and an integrated human and robotic exploration strategy. Recommendations from the Exploration Blueprint included the endorsement of the Nuclear Systems Initiative, augmentation of the bioastronautics research, a focused space transportation program including heavy-lift launch and a common exploration vehicle design for ISS and exploration missions, as well as an integrated human and robotic exploration strategy for Mars. Following the results of the Exploration Blueprint study, the NASA Administrator has asked for a recommendation by June, 2003 on the next steps in human and robotic exploration in

  2. Mission Options Scoping Tool for Mars Orbiters: Mass Cost Calculator (MC2)

    NASA Technical Reports Server (NTRS)

    Sturm, Eric J., II; Deutsch, Marie-Jose; Harmon, Corey; Nakagawa, Roy; Kinsey, Robert; Lopez, Nino; Kudrle, Paul; Evans, Alex

    2007-01-01

    Prior to developing the details of an advanced mission study, the mission architecture trade space is typically explored to assess the scope of feasible options. This paper describes the main features of an Excel-based tool, called the Mass-Cost-Calculator (MC2 ), which is used to perform rapid, high-level mass and cost options analyses of Mars orbiter missions. MC2 consists of a combination of databases, analytical solutions, and parametric relationships to enable quick evaluation of new mission concepts and comparison of multiple architecture options. The tool's outputs provide program management and planning teams with answers to "what if" queries, as well as an understanding of the driving mission elements, during the pre-project planning phase. These outputs have been validated against the outputs generated by the Advanced Projects Design Team (Team X) at NASA's Jet Propulsion Laboratory (JPL). The architecture of the tool allows for future expansion to other orbiters beyond Mars, and to non-orbiter missions, such as those involving fly-by spacecraft, probes, landers, rovers, or other mission elements.

  3. Computer support for cooperative tasks in Mission Operations Centers

    NASA Technical Reports Server (NTRS)

    Fox, Jeffrey; Moore, Mike

    1994-01-01

    Traditionally, spacecraft management has been performed by fixed teams of operators in Mission Operations Centers. The team cooperatively: (1) ensures that payload(s) on spacecraft perform their work; and (2) maintains the health and safety of the spacecraft through commanding and monitoring the spacecraft's subsystems. In the future, the task demands will increase and overload the operators. This paper describes the traditional spacecraft management environment and describes a new concept in which groupware will be used to create a Virtual Mission Operations Center. Groupware tools will be used to better utilize available resources through increased automation and dynamic sharing of personnel among missions.

  4. General Mission Analysis Tool (GMAT): Mission, Vision, and Business Case

    NASA Technical Reports Server (NTRS)

    Hughes, Steven P.

    2007-01-01

    The Goal of the GMAT project is to develop new space trajectory optimization and mission design technology by working inclusively with ordinary people, universities businesses and other government organizations; and to share that technology in an open and unhindered way. GMAT's a free and open source software system; free for anyone to use in development of new mission concepts or to improve current missions, freely available in source code form for enhancement or future technology development.

  5. Solar Probe Plus: A NASA Mission to Touch the SunMission Status Update

    NASA Astrophysics Data System (ADS)

    Fox, N. J.

    2016-12-01

    Solar Probe Plus (SPP), currently in Phase D, will be the first mission to fly into the low solar corona, revealing how the corona is heated and the solar wind and energetic particles are accelerated, solving fundamental mysteries that have been top priority science goals since such a mission was first proposed in 1958. The scale and concept of such a mission has been revised at intervals since that time, yet the core has always been a close encounter with the Sun. The primary science goal of the Solar Probe Plus mission is to determine the structure and dynamics of the Sun's coronal magnetic field, understand how the solar corona and wind are heated and accelerated, and determine what mechanisms accelerate and transport energetic particles. SPP uses an innovative mission design, significant technology development and a risk-reducing engineering development to meet the SPP science objectives. In this presentation, we provide an update on the progress of the Solar Probe Plus mission as we prepare for the July 2018 launch.

  6. NASA's Lunar Polar Ice Prospector, RESOLVE: Mission Rehearsal in Apollo Valley

    NASA Technical Reports Server (NTRS)

    Larson, William E.; Picard, Martin; Quinn, Jacqueline; Sanders, Gerald B.; Colaprete, Anthony; Elphic, Richard C.

    2012-01-01

    After the completion of the Apollo Program, space agencies didn't visit the moon for many years. But then in the 90's, the Clementine and Lunar Prospector missions returned and showed evidence of water ice at the poles. Then in 2009 the Lunar Crater Observation and Sensing Satellite indisputably showed that the Cabeus crater contained water ice and other useful volatiles. Furthermore, instruments aboard the Lunar Reconnaissance Orbiter (LRO) show evidence that the water ice may also be present in areas that receive several days of continuous sunlight each month. However, before we can factor this resource into our mission designs, we must understand the distribution and quantity of ice or other volatiles at the poles and whether it can be reasonably harvested for use as propellant or mission consumables. NASA, in partnership with the Canadian Space Agency (CSA), has been developing a payload to answer these questions. The payload is named RESOLVE. RESOLVE is on a development path that will deliver a tested flight design by the end of 2014. The team has developed a Design Reference Mission using LRO data that has RESOLVE landing near Cabeus Crater in May of2016. One of the toughest obstacles for RESOLVE's solar powered mission is its tight timeline. RESOLVE must be able to complete its objectives in the 5-7 days of available sunlight. The RESOLVE team must be able to work around obstacles to the mission timeline in real time. They can't afford to take a day off to replan as other planetary missions have done. To insure that this mission can be executed as planned, a prototype version of RESOLVE was developed this year and tested at a lunar analog site on Hawaii, known as Apollo Valley, which was once used to train the Apollo astronauts. The RESOLVE team planned the mission with the same type of orbital imagery that would be available from LRO. The simulation team prepositioned a Lander in Apollo Valley with RESOLVE on top mounted on its CSA rover. Then the mission

  7. JSC Astronaut corps, STS-3 vehicle integration test team and others

    NASA Technical Reports Server (NTRS)

    1982-01-01

    Members of the JSC astronaut corps, STS-3 vehicle integration test (VIT) team and other personnel pose for photograph at the completion of a countdown demonstration test (CDDT) and safety briefings at Launch Pad 39A, Kennedy Space Center. Participants are, from the left, Wilbur J. Etbauer, engineer with the VIT team; George W.S. Abbey, Director of Flight Operations at JSC; Astronaut John H. Young, Chief of the Astronaut Office at JSC; Jack Fleming of Rockwell International; Mission Specialist-Astronaut John M. Lounge; Astronaut Daniel C. Brandenstein; Mission Specialist-Astronaut James D. Van Hoften; Astronauts C. Gordon Fullerton and Jack Lousma, prime crew for STS-3; Olan J. Bertrand, VIT team member; Mission Specialist-Astronaut Kathryn D. Sullivan; Richard W. Nygren, head of the VIT team; and Astronaut Donald E. Williams. The Columbia is obscured by its service structure on Launch Pad 39A in the background. Part of slide-wire emergency escape system is visible in the picture.

  8. Requirements, Science, and Measurements for Landsat 10 and Beyond: Perspectives from the Landsat Science Team

    NASA Astrophysics Data System (ADS)

    Crawford, C. J.; Masek, J. G.; Roy, D. P.; Woodcock, C. E.; Wulder, M. A.

    2017-12-01

    The U.S. Geological Survey (USGS) and NASA are currently prioritizing requirements and investing in technology options for a "Landsat 10 and beyond" mission concept as part of the Sustainable Land Imaging (SLI) architecture. Following the successful February 2013 launch of the Landsat 8, the Operational Land Imager (OLI) and Thermal Infrared Sensor (TIRS) have now added over 1 million images to the USGS Landsat archive. The USGS and NASA support and co-lead a Landsat Science Team made up largely of university and government experts to offer independent insight and guidance of program activities and directions. The rapid development of Landsat 9 reflects, in part, strong input from the 2012-2017 USGS Landsat Science Team (LST). During the last two years of the LST's tenure, individual LST members and within LST team working groups have made significant contributions to Landsat 10 and beyond's science traceability and future requirements justification. Central to this input, has been an effort to identify a trade space for enhanced measurement capabilities that maintains mission continuity with eight prior multispectral instruments, and will extend the Landsat Earth observation record beyond 55+ years with an approximate launch date of 2027. The trade space is framed by four fundamental principles in remote sensing theory and practice: (1) temporal resolution, (2) spatial resolution, (3) radiometric resolution, and (4) spectral coverage and resolution. The goal of this communication is to provide a synopsis of past and present 2012-2017 LST contributions to Landsat 10 and beyond measurement science and application priorities. A particular focus will be to document the links between new science and societal benefit areas with potential technical enhancements to the Landsat mission.

  9. A Centaur Reconnaissance Mission: a NASA JPL Planetary Science Summer Seminar mission design experience

    NASA Astrophysics Data System (ADS)

    Chou, L.; Howell, S. M.; Bhattaru, S.; Blalock, J. J.; Bouchard, M.; Brueshaber, S.; Cusson, S.; Eggl, S.; Jawin, E.; Marcus, M.; Miller, K.; Rizzo, M.; Smith, H. B.; Steakley, K.; Thomas, N. H.; Thompson, M.; Trent, K.; Ugelow, M.; Budney, C. J.; Mitchell, K. L.

    2017-12-01

    The NASA Planetary Science Summer Seminar (PSSS), sponsored by the Jet Propulsion Laboratory (JPL), offers advanced graduate students and recent doctoral graduates the unique opportunity to develop a robotic planetary exploration mission that answers NASA's Science Mission Directorate's Announcement of Opportunity for the New Frontiers Program. Preceded by a series of 10 weekly webinars, the seminar is an intensive one-week exercise at JPL, where students work directly with JPL's project design team "TeamX" on the process behind developing mission concepts through concurrent engineering, project design sessions, instrument selection, science traceability matrix development, and risks and cost management. The 2017 NASA PSSS team included 18 participants from various U.S. institutions with a diverse background in science and engineering. We proposed a Centaur Reconnaissance Mission, named CAMILLA, designed to investigate the geologic state, surface evolution, composition, and ring systems through a flyby and impact of Chariklo. Centaurs are defined as minor planets with semi-major axis that lies between Jupiter and Neptune's orbit. Chariklo is both the largest Centaur and the only known minor planet with rings. CAMILLA was designed to address high priority cross-cutting themes defined in National Research Council's Vision and Voyages for Planetary Science in the Decade 2013-2022. At the end of the seminar, a final presentation was given by the participants to a review board of JPL scientists and engineers as well as NASA headquarters executives. The feedback received on the strengths and weaknesses of our proposal provided a rich and valuable learning experience in how to design a successful NASA planetary exploration mission and generate a successful New Frontiers proposal. The NASA PSSS is an educational experience that trains the next generation of NASA's planetary explorers by bridging the gap between scientists and engineers, allowing for participants to learn

  10. Does NASA's Constellation Architecture Offer Opportunities to Achieve Multiple Additional Goals in Space?

    NASA Technical Reports Server (NTRS)

    Thronson, Harley A.; Lester, Daniel F.

    2008-01-01

    Every major NASA human spaceflight program in the last four decades has been modified to achieve goals in space not incorporated within the original design goals: the Apollo Applications Program, Skylab, Space Shuttle, and International Space Station. Several groups in the US have been identifying major future science goals, the science facilities necessary to investigate them, as well as possible roles for augmented versions of elements of NASA's Constellation program. Specifically, teams in the astronomy community have been developing concepts for very capable missions to follow the James Webb Space Telescope that could take advantage of - or require - free-space operations by astronauts and/or robots. Taking as one example, the Single-Aperture Far-InfraRed (SAFIR) telescope with a approx.10+ m aperture proposed for operation in the 2020 timeframe. According to current NASA plans, the Ares V launch vehicle (or a variant) will be available about the same time, as will the capability to transport astronauts to the vicinity of the Moon via the Orion Crew Exploration Vehicle and associated systems. [As the lunar surface offers no advantages - and major disadvantages - for most major optical systems, the expensive system for landing and operating on the lunar surface is not required.] Although as currently conceived, SAFIR and other astronomical missions will operate at the Sun-Earth L2 location, it appears trivial to travel for servicing to the more accessible Earth-Moon L1,2 locations. Moreover, as the recent Orbital Express and Automated Transfer Vehicle missions have demonstrated, future robotic capabilities should offer capabilities that would (remotely) extend human presence far beyond the vicinity of the Earth. In addition to multiplying the value of NASA's architecture for future human spaceflight to achieve the goals multiple major stakeholders, if humans one day travel beyond the Earth-Moon system - say, to Mars - technologies and capabilities for operating

  11. Does NASA's Constellation Architecture Offer Opportunities to Achieve Multiple Additional Goals in Space?

    NASA Technical Reports Server (NTRS)

    Thronson, Harley; Lester, Daniel F.

    2008-01-01

    Every major NASA human spaceflight program in the last four decades has been modified to achieve goals in space not incorporated within the original design goals: the Apollo Applications Program, Skylab, Space Shuttle, and International Space Station. Several groups in the US have been identifying major future science goals, the science facilities necessary to investigate them, as well as possible roles for augmented versions of elements of NASA's Constellation program. Specifically, teams in the astronomy community have been developing concepts for very capable missions to follow the James Webb Space Telescope that could take advantage of - or require - free-space operations by astronauts and/or robots. Taking as one example, the Single-Aperture Far-InfraRed (SAFIR) telescope with a approx. 10+ m aperture proposed for operation in the 2020 timeframe. According to current NASA plans, the Ares V launch vehicle (or a variant) will be available about the same time, as will the capability to transport astronauts to the vicinity of the Moon via the Orion Crew Exploration Vehicle and associated systems. [As the lunar surface offers no advantages - and major disadvantages - for most major optical systems, the expensive system for landing and operating on the lunar surface is not required.] Although as currently conceived, SAFIR and other astronomical missions will operate at the Sun-Earth L2 location, it appears trivial to travel for servicing to the more accessible Earth-Moon L1,2 locations. Moreover. as the recent Orbital Express and Automated Transfer Vehicle missions have demonstrated, future robotic capabilities should offer capabilities that would (remotely) extend human presence far beyond the vicinity of the Earth. In addition to multiplying the value of NASA's architecture for future human spaceflight to achieve the goals multiple major stakeholders. if humans one day travel beyond the Earth-Moon system - say, to Mars - technologies and capabilities for operating

  12. ESA SMART-1 mission: review of results and legacy 10 years after launch

    NASA Astrophysics Data System (ADS)

    Foing, Bernard

    2014-05-01

    We review ESA's SMART-1 highlights and legacy 10 years after launch. The SMART-1 mission to the Moon achieved record firsts such as: 1) first Small Mission for Advanced Research and Technology; with spacecraft built and integrated in 2.5 years and launched 3.5 years after mission approval; 2) first mission leaving the Earth orbit using solar power alone with demonstration for future deep space missions such as BepiColombo; 3) most fuel effective mission (60 litres of Xenon) and longest travel (13 month) to the Moon!; 4) first ESA mission reaching the Moon and first European views of lunar poles; 5) first European demonstration of a wide range of new technologies: Li-Ion modular battery, deep-space communications in X- and Ka-bands, and autonomous positioning for navigation; 6) first lunar demonstration of an infrared spectrometer and of a Swept Charge Detector Lunar X-ray fluorescence spectrometer ; 7) first ESA mission with opportunity for lunar science, elemental geochemistry, surface mineralogy mapping, surface geology and precursor studies for exploration; 8) first controlled impact landing on the Moon with real time observations campaign; 9) first mission supporting goals of the ILEWG/COSPAR International Lunar Exploration Working Group in technical and scientific exchange, international collaboration, public and youth engagement; 10) first mission preparing the ground for ESA collaboration in Chandrayaan-1, Chang'E1-2-3 and near-future landers, sample return and human lunar missions. The SMART-1 technology legacy is applicable to geostationary satellites and deep space missions using solar electric propulsion. The SMART-1 archive observations have been used to support scientific research and prepare subsequent lunar missions and exploration. Most recent SMART-1 results are relevant to topics on: 1) the study of properties of the lunar dust, 2) impact craters and ejecta, 3) the study of illumination, 4) observations and science from the Moon, 5) support to

  13. The extreme ultraviolet explorer mission

    NASA Technical Reports Server (NTRS)

    Malina, R. F.; Bowyer, S.

    1988-01-01

    The science design goals and engineering implementation for the Extreme Ultraviolet Explorer (EUVE) science payload are discussed. The primary scientific goal of the EUVE payload is to carry out an all-sky survey in the 100- to 900-A band of the spectrum. Another goal of the mission is to demonstrate the use of a scientific platform in near-earth orbit. EUVE data will be used to study the distribution of EUV stars in the neighborhood of the sun and the emission physics responsible for the EUV mission.

  14. Multicultural Ground Teams in Space Programs

    NASA Astrophysics Data System (ADS)

    Maier, M.

    2012-01-01

    In the early years of space flight only two countries had access to space. In the last twenty years, there have been major changes in how we conduct space business. With the fall of the iron curtain and the growing of the European Union, more and more players were able to join the space business and space science. By end of the last century, numerous countries, agencies and companies earned the right to be equal partners in space projects. This paper investigates the impact of multicultural teams in the space arena. Fortunately, in manned spaceflight, especially for long duration missions, there are several studies and simulations reporting on multicultural team impact. These data have not been as well explored on the team interactions within the ground crews. The focus of this paper are the teams working on the ISS project. Hypotheses will be drawn from the results of space crew research to determine parallels and differences for this vital segment of success in space missions. The key source of the data will be drawn from structured interviews with managers and other ground crews on the ISS project.

  15. Innovative health care delivery teams: learning to be a team player is as important as learning other specialised skills.

    PubMed

    Fitzgerald, Anneke; Davison, Graydon

    2008-01-01

    The purpose of the paper is to show that free flowing teamwork depends on at least three aspects of team life: functional diversity, social cohesion and superordinate identity. The paper takes the approach of a discussion, arguing for a strong need to understand multidisciplinary and cross-functional barriers for achieving team goals in the context of health care. These barriers include a strong medically dominated business model, historically anchored delineations between professional identities and a complex organisational environment where individuals may have conflicting goals. The paper finds that the complexity is exacerbated by the differences between and within health care teams. It illustrates the differences by presenting the case of an operating theatre team. Whilst the paper recommends some ideas for acquiring these skills, further research is needed to assess effectiveness and influence of team skills training on optimising multidisciplinary interdependence in the health care environment. The paper shows that becoming a team member requires team membership skills.

  16. Mars Surface Mission Workshop

    NASA Technical Reports Server (NTRS)

    Duke, M. B. (Editor)

    1997-01-01

    A workshop was held at the Lunar and Planetary Institute on September 4-5, 1997, to address the surface elements of the Mars Reference Mission now being reviewed by NASA. The workshop considered the current reference mission and addressed the types of activities that would be expected for science and resource exploration and facilities operations. A set of activities was defined that can be used to construct "vignettes" of the surface mission. These vignettes can form the basis for describing the importance of the surface mission, for illustrating aspects of the surface mission, and for allowing others to extend and revise these initial ideas. The topic is rich with opportunities for additional conceptualization. It is recommended that NASA consider supporting university design teams to conduct further analysis of the possibilities.

  17. Cassini End of Mission Press Conference

    NASA Image and Video Library

    2017-09-15

    Cassini program manager at JPL, Earl Maize, left, Cassini project scientist at JPL, Linda Spilker, center, and spacecraft operations team manager for the Cassini mission at Saturn, Julie Webster, right, are seen as they watch a replay of the final moments of the Cassini spacecraft during a press conference held after the end of the Cassini mission, Friday, Sept. 15, 2017 at NASA's Jet Propulsion Laboratory in Pasadena, California. Since its arrival in 2004, the Cassini-Huygens mission has been a discovery machine, revolutionizing our knowledge of the Saturn system and captivating us with data and images never before obtained with such detail and clarity. On Sept. 15, 2017, operators deliberately plunged the spacecraft into Saturn, as Cassini gathered science until the end. Loss of contact with the Cassini spacecraft occurred at 7:55 a.m. EDT (4:55 a.m. PDT). The “plunge” ensures Saturn’s moons will remain pristine for future exploration. During Cassini’s final days, mission team members from all around the world gathered at NASA’s Jet Propulsion Laboratory, Pasadena, California, to celebrate the achievements of this historic mission. Photo Credit: (NASA/Joel Kowsky)

  18. A Team Approach to the Development of Gamma Ray and x Ray Remote Sensing and in Situ Spectroscopy for Planetary Exploration Missions

    NASA Technical Reports Server (NTRS)

    Trombka, J. I.; Floyd, S.; Ruitberg, A.; Evans, L.; Starr, R.; Metzger, A.; Reedy, R.; Drake, D.; Moss, C.; Edwards, B.

    1993-01-01

    An important part of the investigation of planetary origin and evolution is the determination of the surface composition of planets, comets, and asteroids. Measurements of discrete line X-ray and gamma ray emissions from condensed bodies in space can be used to obtain both qualitative and quantitative elemental composition information. The Planetary Instrumentation Definition and Development Program (PIDDP) X-Ray/Gamma Ray Team has been established to develop remote sensing and in situ technologies for future planetary exploration missions.

  19. Leveraging the Educational Outreach Efforts of Low-Cost Missions

    NASA Technical Reports Server (NTRS)

    Fisher, Diane K.; Leon, Nancy J.

    2000-01-01

    A small portion of the budget for every NASA mission must be devoted to education and public outreach. The question is, how can projects best leverage these funds to create a high-quality message and get it disseminated to the largest and most appropriate audience? This paper describes the approach taken by a small educational outreach team for NASA's New Millennium Program (NMP). The team's approach has been twofold: develop a highly desirable suite of products designed to appeal to, as well as enlighten, the target audience; then negotiate relationships with existing, often under-utilized channels for dissemination of these products. Starting with NMP missions as the base of support for these efforts, the team has invited participation by other missions. This approach has resulted in a richer and broader message, and has allowed the continuing development of the audience base.

  20. Teams in Education: Creating an Integrated Approach.

    ERIC Educational Resources Information Center

    Arcaro, Jerome S.

    This handbook is designed to help educational professionals develop cross-functional or departmental quality teams. Nine chapters focus on: (1) the concept of Total Quality Management (TQM) and 14 points for quality in education; (2) team goals and formation; (3) stages of successful team building; (4) the development of quality task teams; (5)…

  1. ESA SMART-1 mission: results and lessons for future lunar exploration

    NASA Astrophysics Data System (ADS)

    Foing, Bernard H.

    We review ESA’s SMART-1 highlights and legacy 10 years after launch. We discuss lessons for future lunar exploration and upcoming missions. The SMART-1 mission to the Moon achieved record firsts such as: 1) first Small Mission for Advanced Research and Technology; with spacecraft built and integrated in 2.5 years and launched 3.5 years after mission approval; 2) first mission leaving the Earth orbit using solar power alone with demonstration for future deep space missions such as BepiColombo; 3) most fuel effective mission (60 litres of Xenon) and longest travel (13 month) to the Moon!; 4) first ESA mission reaching the Moon and first European views of lunar poles; 5) first European demonstration of a wide range of new technologies: Li-Ion modular battery, deep-space communications in X- and Ka-bands, and autonomous positioning for navigation; 6) first lunar demonstration of an infrared spectrometer and of a Swept Charge Detector Lunar X-ray fluorescence spectrometer ; 7) first ESA mission with opportunity for lunar science, elemental geochemistry, surface mineralogy mapping, surface geology and precursor studies for exploration; 8) first controlled impact landing on the Moon with real time observations campaign; 9) first mission supporting goals of the ILEWG/COSPAR International Lunar Exploration Working Group in technical and scientific exchange, international collaboration, public and youth engagement; 10) first mission preparing the ground for ESA collaboration in Chandrayaan-1, Chang’ E1-2-3 and near-future landers, sample return and human lunar missions. The SMART-1 technology legacy is applicable to application geostationary missions and deep space missions using solar electric propulsion. The SMART-1 archive observations have been used to support scientific research and prepare subsequent lunar missions. Most recent SMART-1 results are relevant to topics on: 1) the study of properties of the lunar dust, 2) impact craters and ejecta, 3) the study of

  2. Community College Mission: A '60s Mission Looking at a Y2K World.

    ERIC Educational Resources Information Center

    Levin, Bernard H.

    Although the world has changed considerably in the past three decades, community colleges and their guiding missions have largely not adapted to changing conditions. College mission statements tend to be unfocused documents that provide overly broad goals. In the business world, the mission statements of effective companies are brief, crisp, and…

  3. Autonomous Mission Operations Roadmap

    NASA Technical Reports Server (NTRS)

    Frank, Jeremy David

    2014-01-01

    As light time delays increase, the number of such situations in which crew autonomy is the best way to conduct the mission is expected to increase. However, there are significant open questions regarding which functions to allocate to ground and crew as the time delays increase. In situations where the ideal solution is to allocate responsibility to the crew and the vehicle, a second question arises: should the activity be the responsibility of the crew or an automated vehicle function? More specifically, we must answer the following questions: What aspects of mission operation responsibilities (Plan, Train, Fly) should be allocated to ground based or vehicle based planning, monitoring, and control in the presence of significant light-time delay between the vehicle and the Earth?How should the allocated ground based planning, monitoring, and control be distributed across the flight control team and ground system automation? How should the allocated vehicle based planning, monitoring, and control be distributed between the flight crew and onboard system automation?When during the mission should responsibility shift from flight control team to crew or from crew to vehicle, and what should the process of shifting responsibility be as the mission progresses? NASA is developing a roadmap of capabilities for Autonomous Mission Operations for human spaceflight. This presentation will describe the current state of development of this roadmap, with specific attention to in-space inspection tasks that crews might perform with minimum assistance from the ground.

  4. The Employee Diversity Team Needs You! | Poster

    Cancer.gov

    By Andrea Frydl, Guest Writer The Employee Diversity Team (EDT) is looking for bright, talented, and committed Frederick National Laboratory for Cancer Research (FNL) employees—both government and contractor—who want to share in the team’s mission. EDT’s mission is to create opportunities, sponsor activities, and develop outreach and educational initiatives to:

  5. Mars Sample Return Using Commercial Capabilities: Mission Architecture Overview

    NASA Technical Reports Server (NTRS)

    Gonzales, Andrew A.; Stoker, Carol R.; Lemke, Lawrence G.; Bowles, Jeffery V.; Huynh, Loc C.; Faber, Nicholas T.; Race, Margaret S.

    2014-01-01

    Mars Sample Return (MSR) is the highest priority science mission for the next decade as recommended by the recent Decadal Survey of Planetary Science. This presentation provides an overview of a feasibility study for a MSR mission in which emerging commercial capabilities are used alongside other sources of mission elements. Goal is to reduce the number of mission systems and launches required to return the samples, with the goal of reducing mission cost.. Major elements required for the MSR mission are described. We report the feasibility of a complete and closed MSR mission design

  6. Planning, Implementation and Optimization of Future space Missions using an Immersive Visualization Environement (IVE) Machine

    NASA Astrophysics Data System (ADS)

    Harris, E.

    Planning, Implementation and Optimization of Future Space Missions using an Immersive Visualization Environment (IVE) Machine E. N. Harris, Lockheed Martin Space Systems, Denver, CO and George.W. Morgenthaler, U. of Colorado at Boulder History: A team of 3-D engineering visualization experts at the Lockheed Martin Space Systems Company have developed innovative virtual prototyping simulation solutions for ground processing and real-time visualization of design and planning of aerospace missions over the past 6 years. At the University of Colorado, a team of 3-D visualization experts are developing the science of 3-D visualization and immersive visualization at the newly founded BP Center for Visualization, which began operations in October, 2001. (See IAF/IAA-01-13.2.09, "The Use of 3-D Immersive Visualization Environments (IVEs) to Plan Space Missions," G. A. Dorn and G. W. Morgenthaler.) Progressing from Today's 3-D Engineering Simulations to Tomorrow's 3-D IVE Mission Planning, Simulation and Optimization Techniques: 3-D (IVEs) and visualization simulation tools can be combined for efficient planning and design engineering of future aerospace exploration and commercial missions. This technology is currently being developed and will be demonstrated by Lockheed Martin in the (IVE) at the BP Center using virtual simulation for clearance checks, collision detection, ergonomics and reach-ability analyses to develop fabrication and processing flows for spacecraft and launch vehicle ground support operations and to optimize mission architecture and vehicle design subject to realistic constraints. Demonstrations: Immediate aerospace applications to be demonstrated include developing streamlined processing flows for Reusable Space Transportation Systems and Atlas Launch Vehicle operations and Mars Polar Lander visual work instructions. Long-range goals include future international human and robotic space exploration missions such as the development of a Mars

  7. Group facilitation: building that winning team.

    PubMed

    Krumberger, J M

    1992-12-01

    Team building does not occur by chance; it involves using techniques to make it easier for members to contribute their expertise while working with others to achieve quality results. Evaluation of team effectiveness involves assessing both the processes (team interactions and work processes) and accomplishment of goals (out-comes; see box). Productivity and quality that could not be accomplished by individual efforts may be enhanced by effectively working teams.

  8. Effect of playing tactics on goal scoring in Norwegian professional soccer.

    PubMed

    Tenga, Albin; Holme, Ingar; Ronglan, Lars Tore; Bahr, Roald

    2010-02-01

    Methods that include an assessment of opponent interactions are thought to provide a more valid analysis of team match performance. The purpose of this study was to examine the effect of playing tactics on goal scoring by assessing opponent interactions in Norwegian elite soccer. The sample included 203 team possessions leading to goals (cases) and 1688 random team possessions (control group) from 163 of 182 (90%) matches played in the men's professional league during the 2004 season. Multidimensional qualitative data using ten ordered categorical variables were obtained to characterize each team possession. The proportion of goals scored during counterattacks (52%) was higher than during elaborate attacks (48%), while for the control group the proportion using elaborate attacks (59%) was higher than when using counterattacks (41%) (P = 0.002). Multiple logistic regression analyses showed that, for the main variable "team possession type", counterattacks were more effective than elaborate attacks when playing against an imbalanced defence (OR = 1.64; 95% confidence interval: 1.03 to 2.61; P = 0.038). Assessment of opponent interactions is critical to evaluate the effectiveness of offensive playing tactics on the probability of scoring goals, and improves the validity of team match-performance analysis in soccer.

  9. STS-120 Orbit 2 Flight Control Team Photo

    NASA Image and Video Library

    2007-10-31

    JSC2007-E-095908 (31 Oct. 2007) --- The members of the STS-120 Orbit 2 flight control team pose for a group portrait in the space shuttle flight control room of Houston's Mission Control Center (MCC). Flight director Mike Moses holds the STS-120 mission logo.

  10. Comet nucleus and asteroid sample return missions

    NASA Technical Reports Server (NTRS)

    1992-01-01

    Three Advanced Design Projects have been completed this academic year at Penn State. At the beginning of the fall semester the students were organized into eight groups and given their choice of either a comet nucleus or an asteroid sample return mission. Once a mission had been chosen, the students developed conceptual designs. These were evaluated at the end of the fall semester and combined into three separate mission plans, including a comet nucleus same return (CNSR), a single asteroid sample return (SASR), and a multiple asteroid sample return (MASR). To facilitate the work required for each mission, the class was reorganized in the spring semester by combining groups to form three mission teams. An integration team consisting of two members from each group was formed for each mission so that communication and information exchange would be easier among the groups. The types of projects designed by the students evolved from numerous discussions with Penn State faculty and mission planners at the Johnson Space Center Human/Robotic Spacecraft Office. Robotic sample return missions are widely considered valuable precursors to manned missions in that they can provide details about a site's environment and scientific value. For example, a sample return from an asteroid might reveal valuable resources that, once mined, could be utilized for propulsion. These missions are also more adaptable when considering the risk to humans visiting unknown and potentially dangerous locations, such as a comet nucleus.

  11. Science Goal and Mission Status of JEM-GLIMS

    NASA Astrophysics Data System (ADS)

    Sato, M.; Ushio, T.; Morimoto, T.; Suzuki, M.; Yamazaki, A.; Masayuki, K.; Ishida, R.; Takahashi, Y.; Inan, U. S.; Hobara, Y.; Sakamoto, Y.; Yoshida, K.; Ishikawa, H.; Yoshita, K.

    2009-12-01

    In order to study the generation mechanism of TLEs, global occurrence rates and distributions of lightning and TLEs, and the relationship between lightning, TLEs and TGFs, we will carry out the lightning and TLE observation at Exposed Facility of Japanese Experiment Module (JEM-EF) of International Space Station (ISS). In this mission named JEM-GLIMS (Global Lightning and sprIte MeasurementS on JEM-EF) two kinds of optical instruments and two sets of radio receivers will be integrated into the Multi mission Consolidated Equipment (MCE) which is the bus system and will be installed at JEM-EF finally. The optical instruments consist of two wide FOV CMOS cameras and six wide FOV photometers, and all these optical instruments look the nadir direction. CMOS cameras named LSI (Lightning and Sprite Imager) use the STAR-250 device as a detector, which has 512x512 pixels and 25x25 um pixel size, and have 40 deg. FOV. One CMOS camera with a wide band filter (730-830 nm) mainly measures lightning emission, while another camera with a narrowband filter (766+/-6 nm) mainly measures TLE emission. Five of six photometers named as PH have 40 deg FOV and use photomultiplier tube (PMT) as a photon detector. They equip band-pass filters (150-280 nm, 316+/-5 nm, 337+/-5 nm, 392+/-5 nm, and 762+/-5 nm) for the absolute intensity measurement of the TLE emission. One of six photometers equips a wide-band filter (600-900 nm) to detect lightning occurring within 87 deg FOV. These output signals will be recorded with the sampling frequency of 20 kHz with a 12-bit resolution. One VLF receiver will observe electric field perturbations in the frequency range of 1-40 kHz. One monopole antenna with a 15 cm length will be installed along the nadir direction. Outputs signal from the VLF antenna will be digitally sampled at the VLF electronics by 16-bit resolution with a sampling frequency. There are two sets of VHF antenna, which will be installed at the bottom plate of MCE. VLF antenna will

  12. From Loose Groups to Effective Teams: The Nine Key Factors of the Team Landscape.

    ERIC Educational Resources Information Center

    Sheard, A. G.; Kakabadse, A. P.

    2002-01-01

    A loose group of individuals working on a task differs from an effective team on nine factors: clearly defined goals, priorities, roles and responsibilities, self-awareness, leadership, group dynamics, communications, content, and infrastructure. Ways to eliminate barriers and speed formation of effective teams could be based on those factors.…

  13. 12 CFR 1282.12 - Single-family housing goals.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 7 2011-01-01 2011-01-01 false Single-family housing goals. 1282.12 Section... GOALS AND MISSION Housing Goals § 1282.12 Single-family housing goals. (a) Single-family housing goals. An Enterprise shall be in compliance with a single-family housing goal if its performance under the...

  14. [Developing team reflexivity as a learning and working tool for medical teams].

    PubMed

    Riskin, Arieh; Bamberger, Peter

    2014-01-01

    Team reflexivity is a collective activity in which team members review their previous work, and develop ideas on how to modify their work behavior in order to achieve better future results. It is an important learning tool and a key factor in explaining the varying effectiveness of teams. Team reflexivity encompasses both self-awareness and agency, and includes three main activities: reflection, planning, and adaptation. The model of briefing-debriefing cycles promotes team reflexivity. Its key elements include: Pre-action briefing--setting objectives, roles, and strategies the mission, as well as proposing adaptations based on what was previously learnt from similar procedures; Post-action debriefing--reflecting on the procedure performed and reviewing the extent to which objectives were met, and what can be learnt for future tasks. Given the widespread attention to team-based work systems and organizational learning, efforts should be made toward ntroducing team reflexivity in health administration systems. Implementation could be difficult because most teams in hospitals are short-lived action teams formed for a particular event, with limited time and opportunity to consciously reflect upon their actions. But it is precisely in these contexts that reflexive processes have the most to offer instead of the natural impulsive collective logics. Team reflexivity suggests a potential solution to the major problems of iatorgenesis--avoidable medical errors, as it forces all team members to participate in a reflexive process together. Briefing-debriefing technology was studied mainly in surgical teams and was shown to enhance team-based learning and to improve quality-related outcomes and safety.

  15. STS-105 Flight Control Team Photo

    NASA Image and Video Library

    2001-08-16

    JSC2001-02228 (16 August 2001) --- The members of the STS-105/ISS 7A.1 Planning team pose for a group portrait in the shuttle flight control room (WFCR) in Houston’s Mission Control Center (MCC). Astronaut Robert L. Curbeam, Jr., spacecraft communicator (CAPCOM), stands behind the STS-105 mission logo. Flight director Bryan Austin is visible in the front row on the far right.

  16. Science Goals for the PARCS mission on the International Space Station

    NASA Astrophysics Data System (ADS)

    Ashby, Neil; Hollberg, Leo; Jefferts, Steven; Klipstein, William; Seidel, David; Sullivan, Donald

    2003-05-01

    The PARCS (Primary Atomic Reference Clock in Space) experiment will use a laser-cooled cesium atomic clock operating in the microgravity environment aboard the International Space Station (ISS) to provide both advanced tests of gravitational theory and to demonstrate a new cold-atom clock technology for space. This presentation concentrates on the scientific goals of the PARCS mission. The microgravity space environment allows laser-cooled Cs atoms to have Ramsey times in excess of those feasible on Earth, resulting in improved clock performance. Clock stabilities of 5×10-14 at one second, and uncertainties below 10-16 are projected. The relativistic frequency shift should be measurable at least 40 times better than the previous best measurement made by Gravity Probe A. Significant improvements in testing fundamental assumptions of relativity theory, such as local position invariance (LPI), are expected. PARCS is scheduled for launch in 2007 and may very well fly with the Stanford superconducting microwave oscillator (SUMO) which will allow a Kennedy-Thorndike-type experiment with an improvement of better than three orders of magnitude compared to previous best results. PARCS will also provide a much-improved realization of the second, and a stable time reference in space. PARCS is a joint project by the National Institue of Standards and Technology (NIST), the University of Colorado (CU) and NASA's Jet Propulsion Laboratory (JPL).

  17. Team-based Service Delivery for Students with Disabilities: Practice Options and Guidelines for Success.

    ERIC Educational Resources Information Center

    Ogletree, Billy T.; Bull, Jeannette; Drew, Ruby; Lunnen, Karen Y.

    2001-01-01

    This article reviews the assessment procedures, treatment procedures, and the advantages and disadvantages of three professional-family team models: multidisciplinary teams, interdisciplinary teams, and transdisciplinary teams. Guidelines for optimal team participation are provided. The importance of mission statements, communication, trust,…

  18. Participation in the Cluster Magnetometer Consortium for the Cluster Mission

    NASA Technical Reports Server (NTRS)

    Kivelson, Margaret

    1997-01-01

    Prof. M. G. Kivelson (UCLA) and Dr. R. C. Elphic (LANL) are Co-investigators on the Cluster Magnetometer Consortium (CMC) that provided the fluxgate magnetometers and associated mission support for the Cluster Mission. The CMC designated UCLA as the site with primary responsibility for the inter-calibration of data from the four spacecraft and the production of fully corrected data critical to achieving the mission objectives. UCLA was also charged with distributing magnetometer data to the U.S. Co-investigators. UCLA also supported the Technical Management Team, which was responsible for the detailed design of the instrument and its interface. In this final progress report we detail the progress made by the UCLA team in achieving the mission objectives.

  19. NASA's Swarm Missions: The Challenge of Building Autonomous Software

    NASA Technical Reports Server (NTRS)

    Truszkowski, Walt; Hinchey, Mike; Rash, James; Rouff, Christopher

    2004-01-01

    The days of watching a massive manned cylinder thrust spectacularly off a platform into space might rapidly become ancient history when the National Aeronautics and Space Administration (NASA) introduces its new millenium mission class. Motivated by the need to gather more data than is possible with a single spacecraft, scientists have developed a new class of missions based on the efficiency and cooperative nature of a hive culture. The missions, aptly dubbed nanoswarm will be little more than mechanized colonies cooperating in their exploration of the solar system. Each swarm mission can have hundreds or even thousands of cooperating intelligent spacecraft that work in teams. The spacecraft must operate independently for long periods both in teams and individually, as well as have autonomic properties - self-healing, -configuring, -optimizing, and -protecting- to survive the harsh space environment. One swarm mission under concept development for 2020 to 2030 is the Autonomous Nano Technology Swarm (ANTS), in which a thousand picospacecraft, each weighing less than three pounds, will work cooperatively to explore the asteroid belt. Some spacecraft will form teams to catalog asteroid properties, such as mass, density, morphology, and chemical composition, using their respective miniature scientific instruments. Others will communicate with the data gatherers and send updates to mission elements on Earth. For software and systems development, this is uncharted territory that calls for revolutionary techniques.

  20. STS-132 Flight Control Team in WFCR

    NASA Image and Video Library

    2010-05-25

    JSC2010-E-087358 (25 May 2010) --- The members of the STS-132 Entry flight control team pose for a group portrait in the space shuttle flight control room in the Mission Control Center at NASA's Johnson Space Center. Flight director Tony Ceccacci holds the STS-132 mission logo. Photo credit: NASA or National Aeronautics and Space Administration

  1. Atmospheric tether mission analyses

    NASA Technical Reports Server (NTRS)

    1996-01-01

    NASA is considering the use of tethered satellites to explore regions of the atmosphere inaccessible to spacecraft or high altitude research balloons. This report summarizes the Lockheed Martin Astronautics (LMA) effort for the engineering study team assessment of an Orbiter-based atmospheric tether mission. Lockheed Martin responsibilities included design recommendations for the deployer and tether, as well as tether dynamic analyses for the mission. Three tether configurations were studied including single line, multistrand (Hoytether) and tape designs.

  2. Mission and Design Sensitivities for Human Mars Landers Using Hypersonic Inflatable Aerodynamic Decelerators

    NASA Technical Reports Server (NTRS)

    Polsgrove, Tara P.; Thomas, Herbert D.; Collins, Tim; Dwyer Cianciolo, Alicia; Samareh, Jamshid

    2017-01-01

    Landing humans on Mars is one of NASA's long term goals. The Evolvable Mars Campaign (EMC) is focused on evaluating architectural trade options to define the capabilities and elements needed for a sustainable human presence on the surface of Mars. The EMC study teams have considered a variety of in-space propulsion options and surface mission options. As we seek to better understand how these choices affect the performance of the lander, this work informs and influences requirements for transportation systems to deliver the landers to Mars and enable these missions. This paper presents the effects of mission and vehicle design options on lander mass and performance. Beginning with Earth launch, options include fairing size assumptions, co-manifesting other elements with the lander, and Earth-Moon vicinity operations. Capturing into Mars orbit using either aerocapture or propulsive capture is assessed. For entry, descent, and landing both storable as well as oxygen and methane propellant combinations are considered, engine thrust level is assessed, and sensitivity to landed payload mass is presented. This paper focuses on lander designs using the Hypersonic Inflatable Aerodynamic Decelerators (HIAD), one of several entry system technologies currently considered for human missions.

  3. Next Generation Simulation Framework for Robotic and Human Space Missions

    NASA Technical Reports Server (NTRS)

    Cameron, Jonathan M.; Balaram, J.; Jain, Abhinandan; Kuo, Calvin; Lim, Christopher; Myint, Steven

    2012-01-01

    The Dartslab team at NASA's Jet Propulsion Laboratory (JPL) has a long history of developing physics-based simulations based on the Darts/Dshell simulation framework that have been used to simulate many planetary robotic missions, such as the Cassini spacecraft and the rovers that are currently driving on Mars. Recent collaboration efforts between the Dartslab team at JPL and the Mission Operations Directorate (MOD) at NASA Johnson Space Center (JSC) have led to significant enhancements to the Dartslab DSENDS (Dynamics Simulator for Entry, Descent and Surface landing) software framework. The new version of DSENDS is now being used for new planetary mission simulations at JPL. JSC is using DSENDS as the foundation for a suite of software known as COMPASS (Core Operations, Mission Planning, and Analysis Spacecraft Simulation) that is the basis for their new human space mission simulations and analysis. In this paper, we will describe the collaborative process with the JPL Dartslab and the JSC MOD team that resulted in the redesign and enhancement of the DSENDS software. We will outline the improvements in DSENDS that simplify creation of new high-fidelity robotic/spacecraft simulations. We will illustrate how DSENDS simulations are assembled and show results from several mission simulations.

  4. Industrial Arts Program Goals and Competencies.

    ERIC Educational Resources Information Center

    1974

    The first section of the manual on secondary level industrial arts goal and competencies concerns the ALIVE (Allied Learning Vocational Exploration) Program, a student-managed, individualized learning program involving art, home economics, and industrial arts in a team instruction approach. It provides goals, competencies, and performance…

  5. OSMA Research and Technology Strategy Team Summary

    NASA Technical Reports Server (NTRS)

    Wetherholt, Martha

    2010-01-01

    This slide presentation reviews the work of the Office of Safety and Mission Assurance (OSMA), and the OSMA Research and Technology Strategy (ORTS) team. There is discussion of the charter of the team, Technology Readiness Levels (TRLs) and how the teams responsibilities are related to these TRLs. In order to improve the safety of all levels of the development through the TRL phases, improved communication, understanding and cooperation is required at all levels, particularly at the mid level technologies development.

  6. Antecedents of Player Satisfaction in Team Sports.

    ERIC Educational Resources Information Center

    Melnick, Merrill J.

    1981-01-01

    Satisfaction of participants in team sports hinges on psychosocial needs of individual athletes. Team affiliation creates a ready-made social structure in which emotional rewards of close friendships, motivation to achieve particular goals, and social reinforcement through personal recognition are granted. Other factors include: (1) team size; (2)…

  7. Netball team members, but not hobby group members, distinguish team characteristics from group characteristics.

    PubMed

    Stillman, Jennifer A; Fletcher, Richard B; Carr, Stuart C

    2007-04-01

    Research on groups is often applied to sport teams, and research on teams is often applied to groups. This study investigates the extent to which individuals have distinct schemas for groups and teams. A list of team and group characteristics was generated from 250 individuals, for use in this and related research. Questions about teams versus groups carry an a priori implication that differences exist; therefore, list items were presented to new participants and were analyzed using signal detection theory, which can accommodate a finding of no detectable difference between a nominated category and similar items. Participants were 30 members from each of the following: netball teams, the general public, and hobby groups. Analysis revealed few features that set groups apart from teams; however, teams were perceived as more structured and demanding, requiring commitment and effort toward shared goals. Team and group characteristics were more clearly defined to team members than they were to other participant groups. The research has implications for coaches and practitioners.

  8. Concurrent engineering: Spacecraft and mission operations system design

    NASA Technical Reports Server (NTRS)

    Landshof, J. A.; Harvey, R. J.; Marshall, M. H.

    1994-01-01

    Despite our awareness of the mission design process, spacecraft historically have been designed and developed by one team and then turned over as a system to the Mission Operations organization to operate on-orbit. By applying concurrent engineering techniques and envisioning operability as an essential characteristic of spacecraft design, tradeoffs can be made in the overall mission design to minimize mission lifetime cost. Lessons learned from previous spacecraft missions will be described, as well as the implementation of concurrent mission operations and spacecraft engineering for the Near Earth Asteroid Rendezvous (NEAR) program.

  9. End-to-End Trade-space Analysis for Designing Constellation Missions

    NASA Astrophysics Data System (ADS)

    LeMoigne, J.; Dabney, P.; Foreman, V.; Grogan, P.; Hache, S.; Holland, M. P.; Hughes, S. P.; Nag, S.; Siddiqi, A.

    2017-12-01

    Multipoint measurement missions can provide a significant advancement in science return and this science interest coupled with many recent technological advances are driving a growing trend in exploring distributed architectures for future NASA missions. Distributed Spacecraft Missions (DSMs) leverage multiple spacecraft to achieve one or more common goals. In particular, a constellation is the most general form of DSM with two or more spacecraft placed into specific orbit(s) for the purpose of serving a common objective (e.g., CYGNSS). Because a DSM architectural trade-space includes both monolithic and distributed design variables, DSM optimization is a large and complex problem with multiple conflicting objectives. Over the last two years, our team has been developing a Trade-space Analysis Tool for Constellations (TAT-C), implemented in common programming languages for pre-Phase A constellation mission analysis. By evaluating alternative mission architectures, TAT-C seeks to minimize cost and maximize performance for pre-defined science goals. This presentation will describe the overall architecture of TAT-C including: a User Interface (UI) at several levels of details and user expertise; Trade-space Search Requests that are created from the Science requirements gathered by the UI and validated by a Knowledge Base; a Knowledge Base to compare the current requests to prior mission concepts to potentially prune the trade-space; a Trade-space Search Iterator which, with inputs from the Knowledge Base, and, in collaboration with the Orbit & Coverage, Reduction & Metrics, and Cost& Risk modules, generates multiple potential architectures and their associated characteristics. TAT-C leverages the use of the Goddard Mission Analysis Tool (GMAT) to compute coverage and ancillary data, modeling orbits to balance accuracy and performance. The current version includes uniform and non-uniform Walker constellations as well as Ad-Hoc and precessing constellations, and its

  10. Mission Operations Control Room Activities during STS-2 mission

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Mission Operations Control Room (MOCR) activities during STS-2 mission. President Ronald Reagan is briefed by Dr. Christopher C. Kraft, Jr., JSC Director, who points toward the orbiter spotter on the projection plotter at the front of the MOCR (39499); President Reagan joking with STS-2 astronauts during space to ground conversation (39500); Mission Specialist/Astronaut Sally K. Ride communicates with the STS-2 crew from the spacecraft communicator console (39501); Charles R. Lewis, bronze team Flight Director, monitors activity from the STS-2 crew. He is seated at the flight director console in MOCR (39502); Eugene F. Kranz, Deputy Director of Flight Operations at JSC answers a question during a press conference on Nov. 13, 1981. He is flanked by Glynn S. Lunney, Manager, Space Shuttle Program Office, JSC; and Dr. Christopher C. Kraft, Jr., Director of JSC (39503).

  11. The Landsat 7 mission: terrestrial research and applications for the 21st century

    USGS Publications Warehouse

    Goward, Samuel N.; Masek, Jeffrey G.; Williams, Darrel L.; Irons, James R.; Thompson, R.J.

    2001-01-01

    The Landsat Earth observation approach introduced in 1972 created a new way of monitoring land cover and land use globally. The Landsat 7 mission, successfully launched on April 15, 1999, continues those observations and demonstrates significant progress in precise numerical radiometry, spectral differentiation, and seasonally repetitive monitoring. Substantial improvements in calibration procedures, both prior to launch and during normal operations, have also been made to ensure long-term stability in the acquired spectral radiometry. Landsat 7 data acquisitions are being driven by a long-term data acquisition plan that was designed to ensure that substantially cloud-free, seasonal coverage would be recorded and archived in the US for all land areas of the globe. NASA competitively selected a Landsat Science Team, consisting of representatives from US universities and government agencies, to exploit the Landsat 7 record for global change research. This team is addressing the technical and analytical means to process and analyze the core of this observation record, and for the first time in the history of the Landsat mission, the technical and operational aspects of the mission are being driven by the goals of the US science community. The expected outcome of these efforts is a rapid improvement in understanding the Earth system, as well as conceptual knowledge that will underpin significant advancements in the application of this technology for commercial, operational, educational, and research purposes. Pathways to achieve effective Landsat continuity in the early decades of the 21st century are also being given careful attention, and there is no question that the lessons learned from the Landsat 7 mission will strongly influence these next-generation sensor systems.

  12. Practice effects on intra-team synergies in football teams.

    PubMed

    Silva, Pedro; Chung, Dante; Carvalho, Thiago; Cardoso, Tiago; Davids, Keith; Araújo, Duarte; Garganta, Júlio

    2016-04-01

    Developing synchronised player movements for fluent competitive match play is a common goal for coaches of team games. An ecological dynamics approach advocates that intra-team synchronization is governed by locally created information, which specifies shared affordances responsible for synergy formation. To verify this claim we evaluated coordination tendencies in two newly-formed teams of recreational players during association football practice games, weekly, for fifteen weeks (thirteen matches). We investigated practice effects on two central features of synergies in sports teams - dimensional compression and reciprocal compensation here captured through near in-phase modes of coordination and time delays between coupled players during forward and backwards movements on field while attacking and defending. Results verified that synergies were formed and dissolved rapidly as a result of the dynamic creation of informational properties, perceived as shared affordances among performers. Practising once a week led to small improvements in the readjustment delays between co-positioning team members, enabling faster regulation of coordinated team actions. Mean values of the number of player and team synergies displayed only limited improvements, possibly due to the timescales of practice. No relationship between improvements in dimensional compression and reciprocal compensation were found for number of shots, amount of ball possession and number of ball recoveries made. Findings open up new perspectives for monitoring team coordination processes in sport. Copyright © 2015 Elsevier B.V. All rights reserved.

  13. Mission and Design Sensitivities for Human Mars Landers Using Hypersonic Inflatable Aerodynamic Decelerators

    NASA Technical Reports Server (NTRS)

    Polsgrove, Tara P.; Thomas, Herbert D.; Dwyer Ciancio, Alicia; Collins, Tim; Samareh, Jamshid

    2017-01-01

    Landing humans on Mars is one of NASA's long term goals. NASA's Evolvable Mars Campaign (EMC) is focused on evaluating architectural trade options to define the capabilities and elements needed to sustain human presence on the surface of Mars. The EMC study teams have considered a variety of in-space propulsion options and surface mission options. Understanding how these choices affect the performance of the lander will allow a balanced optimization of this complex system of systems problem. This paper presents the effects of mission and vehicle design options on lander mass and performance. Beginning with Earth launch, options include fairing size assumptions, co-manifesting elements with the lander, and Earth-Moon vicinity operations. Capturing into Mars orbit using either aerocapture or propulsive capture is assessed. For entry, descent, and landing both storable as well as oxygen and methane propellant combinations are considered, engine thrust level is assessed, and sensitivity to landed payload mass is presented. This paper focuses on lander designs using the Hypersonic Inflatable Aerodynamic Decelerators, one of several entry system technologies currently considered for human missions.

  14. Mission Planning and Scheduling System for NASA's Lunar Reconnaissance Mission

    NASA Technical Reports Server (NTRS)

    Garcia, Gonzalo; Barnoy, Assaf; Beech, Theresa; Saylor, Rick; Cosgrove, Jennifer Sager; Ritter, Sheila

    2009-01-01

    In the framework of NASA's return to the Moon efforts, the Lunar Reconnaissance Orbiter (LRO) is the first step. It is an unmanned mission to create a comprehensive atlas of the Moon's features and resources necessary to design and build a lunar outpost. LRO is scheduled for launch in April, 2009. LRO carries a payload comprised of six instruments and one technology demonstration. In addition to its scientific mission LRO will use new technologies, systems and flight operations concepts to reduce risk and increase productivity of future missions. As part of the effort to achieve robust and efficient operations, the LRO Mission Operations Team (MOT) will use its Mission Planning System (MPS) to manage the operational activities of the mission during the Lunar Orbit Insertion (LOI) and operational phases of the mission. The MPS, based on GMV's flexplan tool and developed for NASA with Honeywell Technology Solutions (prime contractor), will receive activity and slew maneuver requests from multiple science operations centers (SOC), as well as from the spacecraft engineers. flexplan will apply scheduling rules to all the requests received and will generate conflict free command schedules in the form of daily stored command loads for the orbiter and a set of daily pass scripts that help automate nominal real-time operations.

  15. The Interdisciplinary Geriatric/Gerontological Team in the Academic Setting.

    PubMed

    Mellor, M Joanna; Solomon, Renee

    1992-01-01

    Geriatric health care requires the services of an interdisciplinary health care team to assess, treat and order the social service needs of the older person, and this concept needs to be included in geriatric social work education. But while the necessity of interdisciplinary team care is recognized, little focus has been placed on the actual process of developing a functional team. The issues that arise-disparate terminologies, organizational and administrative differentials, turf-and the steps needed for a team to become viable are described, using an interdisciplinary team based in academia as a case model. The academic interdisciplinary team may easily become a forum for 'hot air' rather than a catalyst for good practice. This danger is reviewed with reference to stages in the interdisciplinary team development-- goal development group affiliation; team awareness; and goal evaluation. The chapter concludes with a discussion on the impact of the interdisciplinary team on faculty, students and the academic setting.

  16. ARIM-1: The Atmospheric Refractive Index Measurements Sounding Rocket Mission

    NASA Technical Reports Server (NTRS)

    Ruiz, B. Ian (Editor)

    1995-01-01

    A conceptual design study of the ARIM-1 sounding rocket mission, whose goal is to study atmospheric turbulence in the tropopause region of the atmosphere, is presented. The study was conducted by an interdisciplinary team of students at the University of Alaska Fairbanks who were enrolled in a Space Systems Engineering course. The implementation of the ARIM-1 mission will be carried out by students participating in the Alaska Student Rocket Program (ASRP), with a projected launch date of August 1997. The ARIM-1 vehicle is a single stage sounding rocket with a 3:1 ogive nose cone, a payload diameter of 8 in., a motor diameter of 7.6 in., and an overall height of 17.0 ft including the four fins. Emphasis is placed on standardization of payload support systems. The thermosonde payload will measure the atmospheric turbulence by direct measurement of the temperature difference over a distance of one meter using two 3.45-micron 'hot-wire' probes. The recovery system consists of a 6 ft. diameter ribless guide surface drogue chute and a 33 ft. diameter main cross parachute designed to recover a payload of 31 pounds and slow its descent rate to 5 m/s through an altitude of 15 km. This document discusses the science objectives, mission analysis, payload mechanical configuration and structural design, recovery system, payload electronics, ground station, testing plans, and mission implementation.

  17. Case study on industrial hazmat response teams.

    PubMed

    Stephens, Shelly J

    2009-11-01

    In 1991, Amway formed an industrial hazardous materials (hazmat) team in order to respond quickly and efficiently to potential chemical spills. The company's goals were, and still are today, to protect employees, the environment and the local community, and to reduce the amount of resulting downtime. In 1991, the hazmat team was very well funded, enabling it to become a discrete department with its own management staff and nearly 100 hazmat volunteers. Due to changes in the business climate, Amway reorganised in 2000/01, and the hazmat team became part of a company that incorporated contract work into its scope. When this reorganisation occurred, the hazmat team was thoroughly re-evaluated. Its response function was maintained, but was systematically reinvented in the most lean way practicable while still meeting corporate goals. This case study represents Amway's hazmat team's journey through the evaluation process and subsequent reorganisation.

  18. The Virtual Mission Operations Center

    NASA Technical Reports Server (NTRS)

    Moore, Mike; Fox, Jeffrey

    1994-01-01

    Spacecraft management is becoming more human intensive as spacecraft become more complex and as operations costs are growing accordingly. Several automation approaches have been proposed to lower these costs. However, most of these approaches are not flexible enough in the operations processes and levels of automation that they support. This paper presents a concept called the Virtual Mission Operations Center (VMOC) that provides highly flexible support for dynamic spacecraft management processes and automation. In a VMOC, operations personnel can be shared among missions, the operations team can change personnel and their locations, and automation can be added and removed as appropriate. The VMOC employs a form of on-demand supervisory control called management by exception to free operators from having to actively monitor their system. The VMOC extends management by exception, however, so that distributed, dynamic teams can work together. The VMOC uses work-group computing concepts and groupware tools to provide a team infrastructure, and it employs user agents to allow operators to define and control system automation.

  19. The MARS2013 Mars analog mission.

    PubMed

    Groemer, Gernot; Soucek, Alexander; Frischauf, Norbert; Stumptner, Willibald; Ragonig, Christoph; Sams, Sebastian; Bartenstein, Thomas; Häuplik-Meusburger, Sandra; Petrova, Polina; Evetts, Simon; Sivenesan, Chan; Bothe, Claudia; Boyd, Andrea; Dinkelaker, Aline; Dissertori, Markus; Fasching, David; Fischer, Monika; Föger, Daniel; Foresta, Luca; Fritsch, Lukas; Fuchs, Harald; Gautsch, Christoph; Gerard, Stephan; Goetzloff, Linda; Gołebiowska, Izabella; Gorur, Paavan; Groemer, Gerhard; Groll, Petra; Haider, Christian; Haider, Olivia; Hauth, Eva; Hauth, Stefan; Hettrich, Sebastian; Jais, Wolfgang; Jones, Natalie; Taj-Eddine, Kamal; Karl, Alexander; Kauerhoff, Tilo; Khan, Muhammad Shadab; Kjeldsen, Andreas; Klauck, Jan; Losiak, Anna; Luger, Markus; Luger, Thomas; Luger, Ulrich; McArthur, Jane; Moser, Linda; Neuner, Julia; Orgel, Csilla; Ori, Gian Gabriele; Paternesi, Roberta; Peschier, Jarno; Pfeil, Isabella; Prock, Silvia; Radinger, Josef; Ramirez, Barbara; Ramo, Wissam; Rampey, Mike; Sams, Arnold; Sams, Elisabeth; Sandu, Oana; Sans, Alejandra; Sansone, Petra; Scheer, Daniela; Schildhammer, Daniel; Scornet, Quentin; Sejkora, Nina; Stadler, Andrea; Stummer, Florian; Taraba, Michael; Tlustos, Reinhard; Toferer, Ernst; Turetschek, Thomas; Winter, Egon; Zanella-Kux, Katja

    2014-05-01

    We report on the MARS2013 mission, a 4-week Mars analog field test in the northern Sahara. Nineteen experiments were conducted by a field crew in Morocco under simulated martian surface exploration conditions, supervised by a Mission Support Center in Innsbruck, Austria. A Remote Science Support team analyzed field data in near real time, providing planning input for the management of a complex system of field assets; two advanced space suit simulators, four robotic vehicles, an emergency shelter, and a stationary sensor platform in a realistic work flow were coordinated by a Flight Control Team. A dedicated flight planning group, external control centers for rover tele-operations, and a biomedical monitoring team supported the field operations. A 10 min satellite communication delay and other limitations pertinent to human planetary surface activities were introduced. The fields of research for the experiments were geology, human factors, astrobiology, robotics, tele-science, exploration, and operations research. This paper provides an overview of the geological context and environmental conditions of the test site and the mission architecture, in particular the communication infrastructure emulating the signal travel time between Earth and Mars. We report on the operational work flows and the experiments conducted, including a deployable shelter prototype for multiple-day extravehicular activities and contingency situations.

  20. The German joint research project "concepts for future gravity satellite missions"

    NASA Astrophysics Data System (ADS)

    Reubelt, Tilo; Sneeuw, Nico; Fichter, Walter; Müller, Jürgen

    2010-05-01

    Within the German joint research project "concepts for future gravity satellite missions", funded by the Geotechnologies programme of the German Federal Ministry of Education and Research, options and concepts for future satellite missions for precise (time-variable) gravity field recovery are investigated. The project team is composed of members from science and industry, bringing together experts in geodesy, satellite systems, metrology, sensor technology and control systems. The majority of team members already contributed to former gravity missions. The composition of the team guarantees that not only geodetic aspects and objectives are investigated, but also technological and financial constraints are considered. Conversely, satellite, sensor and system concepts are developed and improved in a direct exchange with geodetic and scientific claims. The project aims to develop concepts for both near and mid-term future satellite missions, taking into account e.g. advanced satellite formations and constellations, improved orbit design, innovative metrology and sensor systems and advances in satellite systems.

  1. Planning for future X-ray astronomy missions .

    NASA Astrophysics Data System (ADS)

    Urry, C. M.

    Space science has become an international business. Cutting-edge missions are too expensive and too complex for any one country to have the means and expertise to construct. The next big X-ray mission, Astro-H, led by Japan, has significant participation by Europe and the U.S. The two premier missions currently operating, Chandra and XMM-Newton, led by NASA and ESA, respectively, are thoroughly international. The science teams are international and the user community is International. It makes sense that planning for future X-ray astronomy missions -- and the eventual missions themselves -- be fully integrated on an international level.

  2. Mars integrated transportation system multistage Mars mission

    NASA Technical Reports Server (NTRS)

    1991-01-01

    In accordance with the objective of the Mars Integrated Transport System (MITS) program, the Multistage Mars Mission (MSMM) design team developed a profile for a manned mission to Mars. The purpose of the multistage mission is to send a crew of five astronauts to the martian surface by the year 2019. The mission continues man's eternal quest for exploration of new frontiers. This mission has a scheduled duration of 426 days that includes experimentation en route as well as surface exploration and experimentation. The MSMM is also designed as a foundation for a continuing program leading to the colonization of the planet Mars.

  3. A status of the Turbine Technology Team activities

    NASA Technical Reports Server (NTRS)

    Griffin, Lisa W.

    1992-01-01

    The recent activities of the Turbine Technology Team of the Consortium for Computational Fluid Dynamics (CFD) Application in Propulsion Technology is presented. The team consists of members from the government, industry, and universities. The goal of this team is to demonstrate the benefits to the turbine design process attainable through the application of CFD. This goal is to be achieved by enhancing and validating turbine design tools for improved loading and flowfield definition and loss prediction, and transferring the advanced technology to the turbine design process. In order to demonstrate the advantages of using CFD early in the design phase, the Space Transportation Main Engine (STME) turbines for the National Launch System (NLS) were chosen on which to focus the team's efforts. The Turbine Team activities run parallel to the STME design work.

  4. STS-106 WFCR Planning Flight Team

    NASA Image and Video Library

    2000-09-14

    JSC2000-06247 (September 2000)--- Flight director Bill Reeves, at right foreground, and the fifty-odd flight controllers who support his STS-106 planning team pose for their group portrait in Houston's Mission Control Center.

  5. Does Context, Practice or Competition affect Female Athletes’ Achievement Goal Dominance, Goal Pursuit, Burnout and Motivation?

    PubMed Central

    Fernández-Rio, Javier; Cecchini, Jose A.; Méndez-Giménez, Antonio

    2017-01-01

    Abstract The goal of this study was to assess the effects of two different achievement sport contexts, practice and competition, on the motivational profile of professional/semi-professional athletes. Forty-eight Spanish national/international-level female athletes (basketball = 18; handball = 12; soccer = 11; volleyball = 7), mean age 25.14 ± 3.43 years, agreed to participate in the study. They completed a questionnaire, prior and after training and competition, to assess achievement goals, achievement goal dominance, goal pursuit, motivational climate, motivation, burnout and perceived recovery-exertion. Data analyses revealed that, both in practice and competition, these team-sport athletes overwhelmingly showed a strong mastery-approach achievement goal in dominance as well as in pursuit. A significant finding was that this group of national/international-level, professional/semi-professional athletes not only adopted a mastery-approach achievement goal, but they also actively pursued it. It is also remarkable that this profile remained stable at post-tests, even after a painful defeat in competition, which produced a significant negative effect on the athletes’ burnout (emotional and physical exhaustion and devaluation of sport participation) and self-determined motivation. As expected, the difference between total recovery and perceived exertion significantly increased after practice and competition. National/international-level team-sport professional/semi-professional female athletes held and pursue stable mastery-approach goal dominance. PMID:29134051

  6. Achieving Operability via the Mission System Paradigm

    NASA Technical Reports Server (NTRS)

    Hammer, Fred J.; Kahr, Joseph R.

    2006-01-01

    In the past, flight and ground systems have been developed largely-independently, with the flight system taking the lead, and dominating the development process. Operability issues have been addressed poorly in planning, requirements, design, I&T, and system-contracting activities. In many cases, as documented in lessons-learned, this has resulted in significant avoidable increases in cost and risk. With complex missions and systems, operability is being recognized as an important end-to-end design issue. Never-the-less, lessons-learned and operability concepts remain, in many cases, poorly understood and sporadically applied. A key to effective application of operability concepts is adopting a 'mission system' paradigm. In this paradigm, flight and ground systems are treated, from an engineering and management perspective, as inter-related elements of a larger mission system. The mission system consists of flight hardware, flight software, telecom services, ground data system, testbeds, flight teams, science teams, flight operations processes, procedures, and facilities. The system is designed in functional layers, which span flight and ground. It is designed in response to project-level requirements, mission design and an operations concept, and is developed incrementally, with early and frequent integration of flight and ground components.

  7. Goal Development Practices of Physical Therapists Working in Educational Environments.

    PubMed

    Wynarczuk, Kimberly D; Chiarello, Lisa A; Gohrband, Catherine L

    2017-11-01

    The aims of this study were to (1) describe the practices that school-based physical therapists use in developing student goals, and (2) identify facilitators and barriers to development of goals that are specific to participation in the context of the school setting. 46 school-based physical therapists who participated in a previous study on school-based physical therapy practice (PT COUNTS) completed a questionnaire on goal development. Frequencies and cross tabulations were generated for quantitative data. Open-ended questions were analyzed using an iterative qualitative analysis process. A majority of therapists reported that they frequently develop goals collaboratively with other educational team members. Input from teachers, related services personnel, and parents has the most influence on goal development. Qualitative analysis identified five themes that influence development of participation-based goals: (1) school-based philosophy and practice; (2) the educational environment, settings, and routines; (3) student strengths, needs, and personal characteristics; (4) support from and collaboration with members of the educational team; and (5) therapist practice and motivation. Goal development is a complex process that involves multiple members of the educational team and is influenced by many different aspects of practice, the school environment, and student characteristics.

  8. Lumina Foundation's Strategic Plan. Goal 2025

    ERIC Educational Resources Information Center

    Lumina Foundation for Education, 2009

    2009-01-01

    The mission of Lumina Foundation for Education is to expand access and success in education beyond high school, particularly among adults, first-generation college-going students, low-income students and students of color. This mission is directed toward a single, overarching "big goal"--to increase the percentage of Americans with high-quality…

  9. Cassini End of Mission

    NASA Image and Video Library

    2017-09-15

    Cassini program manager at JPL, Earl Maize, center row, calls out the end of the Cassini mission, Friday, Sept. 15, 2017 at NASA's Jet Propulsion Laboratory in Pasadena, California. Since its arrival in 2004, the Cassini-Huygens mission has been a discovery machine, revolutionizing our knowledge of the Saturn system and captivating us with data and images never before obtained with such detail and clarity. On Sept. 15, 2017, operators deliberately plunged the spacecraft into Saturn, as Cassini gathered science until the end. The “plunge” ensures Saturn’s moons will remain pristine for future exploration. During Cassini’s final days, mission team members from all around the world gathered at NASA’s Jet Propulsion Laboratory, Pasadena, California, to celebrate the achievements of this historic mission. Photo Credit: (NASA/Joel Kowsky)

  10. Final mission design for IRAS

    NASA Technical Reports Server (NTRS)

    Mclaughlin, W. I.

    1984-01-01

    The Infrared Astronomical Satellite (IRAS) was operated on orbit from 26 January to 22 November 1983 (GMT). Its primary purpose, successfully accomplished, was to conduct an all-sky survey in the infrared from 8 to 120 microns. The mission design for this project featured orbit selection; numerous exercises in the geometry of the sphere; computer simulation of mission, sky, and telescope; and an active interface with the IRAS Science Team. In addition to mission design, the subject of mission planning after launch is addressed. The paper makes extensive use of reference to other works on the topic and seeks to derive some general conclusions on the subject based upon the IRAS experience.

  11. Castalia - European Mission to a Main Belt Comet

    NASA Astrophysics Data System (ADS)

    Hilchenbach, M.

    2013-12-01

    Main Belt Comets (MBCs) are a recently identified new solar system population with stable asteroid-like orbits and a comet-like appearance. It is believed that they survived the age of the solar system in a dormant state and that their activity occurred only recently. Buried water ice is the only volatile expected to survive under an insulating surface. Excavation by an impact might expose the ice and trigger the start of MBC activity. The specific science goals of the Castalia mission are: 1. Characterize a new Solar System family, the MBCs, by in-situ investigation 2. Understand the physics of activity on MBCs 3. Directly detect water in the asteroid belt 4. Test if MBCs are a viable source for Earth's water 5. Use MBCs as tracers of planetary system formation and evolution These goals can be achieved by a spacecraft designed to rendezvous with and orbit an MBC for a time interval of some months, arriving before the active period for mapping and then directly sampling the gas and dust released during the active phase. Given the low level of activity of MBCs, and the expectation that their activity comes from only a localized patch on the surface, the orbiting spacecraft will have to be able to maintain a very close orbit over extended periods - the Castalia plan envisages an orbiter capable of ';hovering' autonomously at distances of only a few km from the surface of the MBC. The straw-man instrument payload is made up of: - Visible and near-infrared spectral imager - Thermal infrared imager - Radio science - Dust impact detector - Dust composition analyzer - Neutral/ion mass spectrometer - Magnetometer - Plasma package In addition to this, the option of a surface science package is being considered. At the moment MBC 133P/Elst-Pizarro is the best-known target for such a mission. A design study for the Castalia mission has been carried out in partnership between the science team, DLR and OHB Systems. This study looked at possible missions to 133P with launch

  12. Mars Missions Using Emerging Commercial Space Transportation Capabilities

    NASA Technical Reports Server (NTRS)

    Gonzales, Andrew A.

    2016-01-01

    New Discoveries regarding the Martian Environment may impact Mars mission planning. Transportation of investigation payloads can be facilitated by Commercial Space Transportation options. The development of Commercial Space Transportation. Capabilities anticipated from various commercial entities are examined objectively. The potential for one of these options, in the form of a Mars Sample Return mission, described in the results of previous work, is presented to demonstrate a high capability potential. The transportation needs of the Mars Environment Team Project at ISU 2016 may fit within the payload capabilities of a Mars Sample Return mission, but the payload elements may or may not differ. Resource Modules will help you develop a component of a strategy to address the Implications of New Discoveries in the Martian Environment using the possibility of efficient, commercial space transportation options. Opportunities for open discussions as appropriate during the team project formulation period at the end of each Resource Module. The objective is to provide information that can be incorporated into your work in the Team Project including brainstorming.

  13. Clementine: An inexpensive mission to the Moon and Geographos

    NASA Astrophysics Data System (ADS)

    Shoemaker, Eugene M.; Nozette, Stewart

    1993-03-01

    The Clementine Mission, a joint project of the Strategic Defense Initiative Organization (SDIO) and NASA, has been planned primarily to test and demonstrate a suite of lightweight sensors and other lightweight spacecraft components under extended exposure to the space environment. Although the primary objective of the mission is to space-qualify sensors for Department of Defense applications, it was recognized in 1990 that such a mission might also be designed to acquire scientific observations of the Moon and of Apollo asteroid (1620) Geographos. This possibility was explored jointly by SDIO and NASA, including representatives from NASA's Discovery Program Science Working Group, in early 1991. Besides the direct return of scientific information, one of the benefits envisioned from a joint venture was the development of lightweight components for possible future use in NASA's Discovery-class spacecraft. In Jan. 1992, SDIO informed NASA of its intent to fly a 'Deep Space Program Science Experiment,' now popularly called Clementine; NASA then formed an advisory science working group to assist in the early development of the mission. The Clementine spacecraft is being assembled at the Naval Research Laboratory, which is also in charge of the overall mission design and mission operations. Support for mission design is being provided by GSFC and by JPL. NASA's Deep Space Network will be utilized in tracking and communicating with the spacecraft. Following a recommendation of the COMPLEX committee of the Space Science Board, NASA will issue an NRA and appoint a formal science team in early 1993. Clementine is a 3-axis stabilized, 200 kg (dry weight) spacecraft that will be launched on a refurbished Titan-2G. One of the goals has been to build two spacecraft, including the sensors, for $100M. Total time elapsed from the decision to proceed to the launch will be two years.

  14. Low injury rate strongly correlates with team success in Qatari professional football.

    PubMed

    Eirale, Cristiano; Tol, J L; Farooq, Abdulaziz; Smiley, Faten; Chalabi, Hakim

    2013-08-01

    Although the incidence of football injuries should relate to team success there is little empirical evidence. We investigated the relationship between injury incidence and team success in Qatar first-division football clubs. Using a prospective cohort study design, we captured exposure and injuries in Qatar male elite football for a season. Club performance was measured by total league points, ranking, goal scored, goals conceded and number of matches won, drawn or lost. Lower injury incidence was strongly correlated with team ranking position (r=0.929, p=0.003), more games won (r=0.883, p=0.008), more goals scored (r=0.893, p=0.007), greater goal difference (r=0.821, p=0.003) and total points (r=0.929, p=0.003). Lower incidence rate was strongly correlated with team success. Prevention of injuries may contribute to team success.

  15. Precinct Domestic Violence Teams: Whose Goals Should Determine Program Activities?

    ERIC Educational Resources Information Center

    Weisz, Arlene N.; Black, Beverly M.; Nahan, Neva

    2005-01-01

    This article describes an urban community's attempts to increase domestic violence survivors' participation in the criminal justice system by combining social work advocacy, specialized police officers, and prosecutors into precinct domestic violence teams. An analysis of the outcomes of 1,057 domestic violence reports found that the presence of…

  16. Lessons Learned from Engineering a Multi-Mission Satellite Operations Center

    NASA Technical Reports Server (NTRS)

    Madden, Maureen; Cary, Everett, Jr.; Esposito, Timothy; Parker, Jeffrey; Bradley, David

    2006-01-01

    NASA's Small Explorers (SMEX) satellites have surpassed their designed science-lifetimes and their flight operations teams are now facing the challenge of continuing operations with reduced funding. At present, these missions are being reengineered into a fleet-oriented ground system at Goddard Space Flight Center (GSFC). When completed, this ground system will provide command and control of four SMEX missions and will demonstrate fleet automation and control concepts. As a path-finder for future mission consolidation efforts, this ground system will also demonstrate new ground-based technologies that show promise of supporting longer mission lifecycles and simplifying component integration. One of the core technologies being demonstrated in the SMEiX Mission Operations Center is the GSFC Mission Services Evolution Center (GMSEC) architecture. The GMSEC architecture uses commercial Message Oriented Middleware with a common messaging standard to realize a higher level of component interoperability, allowing for interchangeable components in ground systems. Moreover, automation technologies utilizing the GMSEC architecture are being evaluated and implemented to provide extended lights-out operations. This mode of operation will provide routine monitoring and control of the heterogeneous spacecraft fleet. The operational concepts being developed will reduce the need for staffed contacts and is seen as a necessity for fleet management. This paper will describe the experiences of the integration team throughout the reengineering effort of the SMEX ground system. Additionally, lessons learned will be presented based on the team s experiences with integrating multiple missions into a fleet-based automated ground system.

  17. Lessons Learned from Engineering a Multi-Mission Satellite Operations Center

    NASA Technical Reports Server (NTRS)

    Madden, Maureen; Cary, Everett, Jr.; Esposito, Timothy; Parker, Jeffrey; Bradley, David

    2006-01-01

    NASA's Small Explorers (SMEX) satellites have surpassed their designed science-lifetimes and their flight operations teams are now facing the challenge of continuing operations with reduced funding. At present, these missions are being re-engineered into a fleet-oriented ground system at Goddard Space Flight Center (GSFC). When completed, this ground system will provide command and control of four SMEX missions and will demonstrate fleet automation and control concepts. As a path-finder for future mission consolidation efforts, this ground system will also demonstrate new ground-based technologies that show promise of supporting longer mission lifecycles and simplifying component integration. One of the core technologies being demonstrated in the SMEX Mission Operations Center is the GSFC Mission Services Evolution Center (GMSEC) architecture. The GMSEC architecture uses commercial Message Oriented Middleware with a common messaging standard to realize a higher level of component interoperability, allowing for interchangeable components in ground systems. Moreover, automation technologies utilizing the GMSEC architecture are being evaluated and implemented to provide extended lights-out operations. This mode of operation will provide routine monitoring and control of the heterogeneous spacecraft fleet. The operational concepts being developed will reduce the need for staffed contacts and is seen as a necessity for fleet management. This paper will describe the experiences of the integration team throughout the re-enginering effort of the SMEX ground system. Additionally, lessons learned will be presented based on the team's experiences with integrating multiple missions into a fleet-automated ground system.

  18. The NASA Exploration Design Team; Blueprint for a New Design Paradigm

    NASA Technical Reports Server (NTRS)

    Oberto, Robert E.; Nilsen, Erik; Cohen, Ron; Wheeler, Rebecca; DeFlorio, Paul

    2005-01-01

    NASA has chosen JPL to deliver a NASA-wide rapid-response real-time collaborative design team to perform rapid execution of program, system, mission, and technology trade studies. This team will draw on the expertise of all NASA centers and external partners necessary. The NASA Exploration Design Team (NEDT) will be led by NASA Headquarters, with field centers and partners added according to the needs of each study. Through real-time distributed collaboration we will effectively bring all NASA field centers directly inside Headquarters. JPL's Team X pioneered the technique of real time collaborative design 8 years ago. Since its inception, Team X has performed over 600 mission studies and has reduced per-study cost by a factor of 5 and per-study duration by a factor of 10 compared to conventional design processes. The Team X concept has spread to other NASA centers, industry, academia, and international partners. In this paper, we discuss the extension of the JPL Team X process to the NASA-wide collaborative design team. We discuss the architecture for such a process and elaborate on the implementation challenges of this process. We further discuss our current ideas on how to address these challenges.

  19. Comprehensive planning of data archive in Japanese planetary missions

    NASA Astrophysics Data System (ADS)

    Yamamoto, Yukio; Shinohara, Iku; Hoshino, Hirokazu; Tateno, Naoki; Hareyama, Makoto; Okada, Naoki; Ebisawa, Ken

    Comprehensive planning of data archive in Japanese planetary missions Japan Aerospace Exploration Agency (JAXA) provides HAYABUSA and KAGUYA data as planetary data archives. These data archives, however, were prepared independently. Therefore the inconsistency of data format has occurred, and the knowledge of data archiving activity is not inherited. Recently, the discussion of comprehensive planning of data archive has started to prepare up-coming planetary missions, which indicates the comprehensive plan of data archive is required in several steps. The framework of the comprehensive plan is divided into four items: Preparation, Evaluation, Preservation, and Service. 1. PREPARATION FRAMEWORK Data is classified into several types: raw data, level-0, 1, 2 processing data, ancillary data, and etc. The task of mission data preparation is responsible for instrument teams, but preparations beside mission data and support of data management are essential to make unified conventions and formats over instruments in a mission, and over missions. 2. EVALUATION FRAMEWORK There are two meanings of evaluation: format and quality. The format evaluation is often discussed in the preparation framework. The data quality evaluation which is often called quality assurance (QA) or quality control (QC) must be performed by third party apart from preparation teams. An instrument team has the initiative for the preparation itself, and the third-party group is organized to evaluate the instrument team's activity. 3. PRESERVATION FRAMEWORK The main topic of this framework is document management, archiving structure, and simple access method. The mission produces many documents in the process of the development. Instrument de-velopment is no exception. During long-term development of a mission, many documents are obsoleted and updated repeatedly. A smart system will help instrument team to reduce some troubles of document management and archiving task. JAXA attempts to follow PDS manners

  20. NASA's Planetary Science Missions and Participations

    NASA Astrophysics Data System (ADS)

    Daou, Doris; Green, James L.

    2017-04-01

    NASA's Planetary Science Division (PSD) and space agencies around the world are collaborating on an extensive array of missions exploring our solar system. Planetary science missions are conducted by some of the most sophisticated robots ever built. International collaboration is an essential part of what we do. NASA has always encouraged international participation on our missions both strategic (ie: Mars 2020) and competitive (ie: Discovery and New Frontiers) and other Space Agencies have reciprocated and invited NASA investigators to participate in their missions. NASA PSD has partnerships with virtually every major space agency. For example, NASA has had a long and very fruitful collaboration with ESA. ESA has been involved in the Cassini mission and, currently, NASA funded scientists are involved in the Rosetta mission (3 full instruments, part of another), BepiColombo mission (1 instrument in the Italian Space Agency's instrument suite), and the Jupiter Icy Moon Explorer mission (1 instrument and parts of two others). In concert with ESA's Mars missions NASA has an instrument on the Mars Express mission, the orbit-ground communications package on the Trace Gas Orbiter (launched in March 2016) and part of the DLR/Mars Organic Molecule Analyzer instruments going onboard the ExoMars Rover (to be launched in 2018). NASA's Planetary Science Division has continuously provided its U.S. planetary science community with opportunities to include international participation on NASA missions too. For example, NASA's Discovery and New Frontiers Programs provide U.S. scientists the opportunity to assemble international teams and design exciting, focused planetary science investigations that would deepen the knowledge of our Solar System. The PSD put out an international call for instruments on the Mars 2020 mission. This procurement led to the selection of Spain and Norway scientist leading two instruments and French scientists providing a significant portion of another

  1. Continuous quality improvement at work: the first team--Part II.

    PubMed

    Bolt, B J; Lehany-Trese, A M; Williams, T P

    1995-01-01

    This second part of a two-part article follows Cape Canaveral Hospital's first continuous quality improvement team through the processes of goal setting, system analysis, data gathering, and problem resolution in the area of patients' assignment to observation status. The team's primary goal was data-driven improvement. As detailed here, the team's solution to improve the use of observation status is both time-efficient and offers opportunities for financial gain.

  2. Results from the NASA Capability Roadmap Team for In-Situ Resource Utilization (ISRU)

    NASA Technical Reports Server (NTRS)

    Sanders, Gerald B.; Romig, Kris A.; Larson, William E.; Johnson, Robert; Rapp, Don; Johnson, Ken R.; Sacksteder, Kurt; Linne, Diane; Curreri, Peter; Duke, Michael; hide

    2005-01-01

    On January 14, 2004, the President of the United States unveiled a new vision for robotic and human exploration of space entitled, "A Renewed Spirit of Discovery". As stated by the President in the Vision for Space Exploration (VSE), NASA must "... implement a sustained and affordable human and robotic program to explore the solar system and beyond " and ".. .develop new technologies and harness the moon's abundant resources to allow manned exploration of more challenging environments." A key to fulfilling the goal of sustained and affordable human and robotic exploration will be the ability to use resources that are available at the site of exploration to "live off the land" instead of bringing everything from Earth, known as In-Situ Resource Utilization (ISRU). ISRU can significantly reduce the mass, cost, and risk of exploration through capabilities such as: mission consumable production (propellants, fuel cell reagents, life support consumables, and feedstock for manufacturing & construction); surface construction (radiation shields, landing pads, walls, habitats, etc.); manufacturing and repair with in-situ resources (spare parts, wires, trusses, integrated systems etc.); and space utilities and power from space resources. On January 27th, 2004 the President's Commission on Implementation of U.S. Space Exploration Policy (Aldridge Committee) was created and its final report was released in June 2004. One of the report's recommendations was to establish special project teams to evaluate enabling technologies, of which "Planetary in situ resource utilization" was one of them. Based on the VSE and the commission's final report, NASA established fifteen Capability Roadmap teams, of which ISRU was one of the teams established. From Oct. 2004 to May 2005 the ISRU Capability Roadmap team examined the capabilities, benefits, architecture and mission implementation strategy, critical decisions, current state-of-the-art (SOA), challenges, technology gaps, and risks of

  3. Clifford Charlesworth seated at his console in Mission Control Room

    NASA Image and Video Library

    1968-12-21

    S68-55742 (21 Dec. 1968) --- Clifford E. Charlesworth, Apollo 8 "Green Team" flight director, is seated at his console in the Mission Operations Control Room in the Mission Control Center, Building 30, during the launch of the Apollo 8 (Spacecraft 103/Saturn 503) manned lunar orbit space mission.

  4. (abstract) Student Involvement in the Pluto Mission

    NASA Technical Reports Server (NTRS)

    Weinstein, Stacy

    1994-01-01

    The Pluto Fast Flyby mission development baseline consists of 2 identical spacecraft (120 - 165 kg) to be launched to Pluto/ Charon in the late 1990s. These spacecraft are intended to fly by Pluto and Charon in order to perform various remote-sensing scientific investigations and have a mission development cost less than $400M (FY92$) through launch plus 30 days. The Pluto team is committed to involving students in all areas of mission development and operations. In November 1992, the Pluto team sent a request for information to industry and universities looking for ways to lower the mass and cost of the mission. A number of universities responded with creative and promising technological developments. In addition to contracts with industry and other federal labs, contracts were signed with schools which allowed students to apply their research, enabling the Pluto team to use valuable resources on a variety of advanced technology endeavors. Perhaps the most exciting aspect of these investigations was that the deliverables that the students produced were not just final reports, but actual prototype hardware complete with write-ups on lessons learned in machining, programming, and design. Another exciting development was a prototype adapter competition in which 7 universities competed to design, build, and test their idea of a lightweight spacecraft-propulsion stack adapter. Georgia Tech won with an innovative dodecahedron composite lattice cone. Other students from other universities were involved as well. All in all, over 40 students from 20 different colleges made significant contributions to the Pluto Fast Flyby mission development through their efforts. This paper will give an overview of Pluto student involvement, the technologies which they examined, and useful results for the mission.

  5. 2016 Science Mission Directorate Technology Highlights

    NASA Technical Reports Server (NTRS)

    Seablom, Michael S.

    2017-01-01

    The role of the Science Mission Directorate (SMD) is to enable NASA to achieve its science goals in the context of the nation's science agenda. SMD's strategic decisions regarding future missions and scientific pursuits are guided by agency goals, input from the science community including the recommendations set forth in the National Research Council (NRC) decadal surveys and a commitment to preserve a balanced program across the major science disciplines. Toward this end, each of the four SMD science divisions -- Heliophysics, Earth Science, Planetary Science, and Astrophysics -- develops fundamental science questions upon which to base future research and mission programs.

  6. Merits of a Locality Sample for Accomplishing Mars Exploration Goals: The First Sample Return Mission

    NASA Astrophysics Data System (ADS)

    Draper, D. S.; Bogard, D. D.; Agee, C. B.; McKay, G. A.; Jones, J. H.

    2002-05-01

    A major stumbling block to a Mars sample return (MSR) mission is the seemingly prohibitive cost of maximizing sample diversity. The use of rovers, sophisticated on-board instrumentation, and various sample selection techniques are perceived by some to be necessary to maximize the scientific return by making it possible to acquire as diverse a suite of samples as possible. Here, we argue that many key science goals of the Mars Exploration Program may be accomplished by returning only a "locality sample" at a well-chosen landing site. A locality sample would be local regolith consisting of soil, windblown fines, and lithic fragments (plus Martian atmosphere). We argue that even the simplest sample return mission could revolutionize our understanding of the planet, without requiring the large outlays for technology development currently envisioned. By the time a MSR mission could realistically be flown, it is reasonable to expect that information from the Mars Odyssey, Mars Express, 2003 Mars Exploration Rovers, and 2005 Mars Reconnaissance Orbiter will be sufficient to make a good choice of landing site. Returned samples of Martian regolith have the potential to answer key questions of fundamental importance to the Mars Exploration Program: The search for life; understanding the role and history of water and other volatiles; helping to interpret remotely-sensed spectral data; and understanding the planet as a system. The value of such samples has been studied exhaustively for decades and detailed in publications dating back at least to 1974. A locality sample can further the search for life by identifying, among other things, trace quantities of surface organics, biogenic elements and their isotopic compositions, evidence for water in the form of hydrous minerals and/or cements, the nature of the Martian soil oxidant, trace biomarkers, and evidence for clay-forming processes. The role of water will be better understood by revealing, in addition, whether interactions

  7. Packaging a Successful NASA Mission to Reach a Large Audience with a Small Budget. Earth's Dynamic Space: Solar-Terrestrial Physics and NASA's Polar Mission

    NASA Technical Reports Server (NTRS)

    Fox, Nicola J.; Goldberg, Richard; Barnes, Robin J.; Sigwarth, John B.; Beisser, Kerri B.; Moore, Thomas E.; Hoffman, Robert A.; Russell, Christopher T.; Scudder, Jack D.; Spann, James F.

    2004-01-01

    To showcase the on-going and wide-ranging scope of the Polar science discoveries, the Polar science team has created a one-stop shop for a thorough introduction to geospace physics, in the form of a DVD with supporting website. The DVD, Earth's Dynamic Space: Solar-Terrestrial Physics & NASA's Polar Mission, can be viewed as an end-to-end product or split into individual segments and tailored to lesson plans. Capitalizing on the Polar mission and its amazing science return, the Polar team created an exciting multi-use DVD intended for audiences ranging from a traditional classroom and after school clubs, to museums and science centers. The DVD tackles subjects such as the aurora, the magnetosphere and space weather, whilst highlighting the science discoveries of the Polar mission. This platform introduces the learner to key team members as well as the science principles. Dramatic visualizations are used to illustrate the complex principles that describe Earth's dynamic space. In order to produce such a wide-ranging product on a shoe-string budget, the team poured through existing NASA resources to package them into the Polar story. Team members also created visualizations using Polar data to complement the NASA stock footage. Scientists donated their time to create and review scripts to make this a real team effort, working closely with the award winning audio-visual group at JHU/Applied Physics Laboratory. The team was excited to be invited to join NASA's Sun-Earth Day 2005 E/PO program and the DVD will be distributed as part of the supporting educational packages.

  8. New Approach to Concept Feasibility and Design Studies for Astrophysics Missions

    NASA Technical Reports Server (NTRS)

    Deutsch, M. J.; McLaughlin, W.; Nichols, J.

    1998-01-01

    JPL has assembled a team of multidisciplinary experts with corporate knowledge of space mission and instrument development. The advanced Concept Design Team, known as Team X, provides interactive design trades including cost as a design parameter, and advanced visualization for pre-Phase A Studies.

  9. Castalia - A Mission to a Main Belt Comet

    NASA Astrophysics Data System (ADS)

    Jones, G. H.; Snodgrass, C.

    2015-10-01

    Main Belt Comets (MBCs), or Active Asteroids, constitute a newly identified class of solar system objects. They have stable, asteroid-like orbits and some exhibit a recurrent comet-like appearance. It is believed that they survived the age of the solarsystem in a dormant state and that their current ice sublimation driven activity only began recently. Buried water ice is the only volatile expected to survive under an insulating surface. Excavation by an impact can expose the ice and trigger the start of MBC activity. We present the case for a mission to one of these objects. The specific science goals of the Castalia mission are: 1. Characterize a new Solar System family, the MBCs, by in-situ investigation 2. Understand the physics of activity on MBCs 3. Directly sample water in the asteroid belt and test if MBCs are a viable source for Earth's water 4. Use the observed structure of an MBC as a tracer of planetary system formation and evolution. These goals can be achieved by a spacecraft designed to rendezvous with and orbit an MBC for a time interval of some months, arriving before the active period for mapping and then sampling the gas and dust released during the active phase. Given the low level of activity of MBCs, and the expectation that their activity comes from only a localized patch on the surface, the orbiting spacecraft will have to be able to maintain a very close orbit over extended periods - the Castalia plan envisages an orbiter capable of 'hovering' autonomously at distances of only a few km from the surface of the MBC. The strawman payload comprises a Visible and near-infrared spectral imager, Thermal infrared imager, Radio science,Subsurface radar, Dust impact detector, Dust composition analyser, Neutral/ion mass spectrometer, Magnetometer, and Plasma package. In addition to this, a surface science package is being considered. At the moment, MBC 133P/Elst Pizarro is the bestknown target for such a mission. A design study for the Castalia mission

  10. Selecting Appropriate Training Goals and Objectives.

    ERIC Educational Resources Information Center

    Zane, Thomas; Thvedt, John E.

    The authors propose a system for determining which goals and target behaviors are of highest priority for handicapped students. In a meeting of the interdisciplinary treatment team, goals are set forth and ranked according to answers to a series of questions: (1) will acquiring the behavior increase the probability of the client living, being…

  11. Human and Robotic Mission to Small Bodies: Mapping, Planning and Exploration

    NASA Technical Reports Server (NTRS)

    Neffian, Ara V.; Bellerose, Julie; Beyer, Ross A.; Archinal, Brent; Edwards, Laurence; Lee, Pascal; Colaprete, Anthony; Fong, Terry

    2013-01-01

    This study investigates the requirements, performs a gap analysis and makes a set of recommendations for mapping products and exploration tools required to support operations and scientific discovery for near- term and future NASA missions to small bodies. The mapping products and their requirements are based on the analysis of current mission scenarios (rendezvous, docking, and sample return) and recommendations made by the NEA Users Team (NUT) in the framework of human exploration. The mapping products that sat- isfy operational, scienti c, and public outreach goals include topography, images, albedo, gravity, mass, density, subsurface radar, mineralogical and thermal maps. The gap analysis points to a need for incremental generation of mapping products from low (flyby) to high-resolution data needed for anchoring and docking, real-time spatial data processing for hazard avoidance and astronaut or robot localization in low gravity, high dynamic environments, and motivates a standard for coordinate reference systems capable of describing irregular body shapes. Another aspect investigated in this study is the set of requirements and the gap analysis for exploration tools that support visualization and simulation of operational conditions including soil interactions, environment dynamics, and communications coverage. Building robust, usable data sets and visualisation/simulation tools is the best way for mission designers and simulators to make correct decisions for future missions. In the near term, it is the most useful way to begin building capabilities for small body exploration without needing to commit to specific mission architectures.

  12. NASA's Solar Dynamics Observatory (SDO): A Systems Approach to a Complex Mission

    NASA Technical Reports Server (NTRS)

    Ruffa, John A.; Ward, David K.; Bartusek, LIsa M.; Bay, Michael; Gonzales, Peter J.; Pesnell, William D.

    2012-01-01

    The Solar Dynamics Observatory (SDO) includes three advanced instruments, massive science data volume, stringent science data completeness requirements, and a custom ground station to meet mission demands. The strict instrument science requirements imposed a number of challenging drivers on the overall mission system design, leading the SDO team to adopt an integrated systems engineering presence across all aspects of the mission to ensure that mission science requirements would be met. Key strategies were devised to address these system level drivers and mitigate identified threats to mission success. The global systems engineering team approach ensured that key drivers and risk areas were rigorously addressed through all phases of the mission, leading to the successful SDO launch and on-orbit operation. Since launch, SDO's on-orbit performance has met all mission science requirements and enabled groundbreaking science observations, expanding our understanding of the Sun and its dynamic processes.

  13. NASA's Solar Dynamics Observatory (SDO): A Systems Approach to a Complex Mission

    NASA Technical Reports Server (NTRS)

    Ruffa, John A.; Ward, David K.; Bartusek, Lisa M.; Bay, Michael; Gonzales, Peter J.; Pesnell, William D.

    2012-01-01

    The Solar Dynamics Observatory (SDO) includes three advanced instruments, massive science data volume, stringent science data completeness requirements, and a custom ground station to meet mission demands. The strict instrument science requirements imposed a number of challenging drivers on the overall mission system design, leading the SDO team to adopt an integrated systems engineering presence across all aspects of the mission to ensure that mission science requirements would be met. Key strategies were devised to address these system level drivers and mitigate identified threats to mission success. The global systems engineering team approach ensured that key drivers and risk areas were rigorously addressed through all phases of the mission, leading to the successful SDO launch and on-orbit operation. Since launch, SDO s on-orbit performance has met all mission science requirements and enabled groundbreaking science observations, expanding our understanding of the Sun and its dynamic processes.

  14. Cassini End of Mission

    NASA Image and Video Library

    2017-09-15

    Cassini program manager at JPL, Earl Maize packs up his workspace in mission control after the end of the Cassini mission, Friday, Sept. 15, 2017 at NASA's Jet Propulsion Laboratory in Pasadena, California. Since its arrival in 2004, the Cassini-Huygens mission has been a discovery machine, revolutionizing our knowledge of the Saturn system and captivating us with data and images never before obtained with such detail and clarity. On Sept. 15, 2017, operators deliberately plunged the spacecraft into Saturn, as Cassini gathered science until the end. Loss of contact with the Cassini spacecraft occurred at 7:55 a.m. EDT (4:55 a.m. PDT). The “plunge” ensures Saturn’s moons will remain pristine for future exploration. During Cassini’s final days, mission team members from all around the world gathered at NASA’s Jet Propulsion Laboratory, Pasadena, California, to celebrate the achievements of this historic mission. Photo Credit: (NASA/Joel Kowsky)

  15. Cassini End of Mission

    NASA Image and Video Library

    2017-09-15

    A computer screen in mission control displays mission elapsed time for Cassini minutes after the spacecraft plunged into Saturn's atmosphere, Friday, Sept. 15, 2017 at NASA's Jet Propulsion Laboratory in Pasadena, California. Since its arrival in 2004, the Cassini-Huygens mission has been a discovery machine, revolutionizing our knowledge of the Saturn system and captivating us with data and images never before obtained with such detail and clarity. On Sept. 15, 2017, operators will deliberately plunge the spacecraft into Saturn, as Cassini gathered science until the end. Loss of contact with the Cassini spacecraft occurred at 7:55 a.m. EDT (4:55 a.m. PDT). The “plunge” ensures Saturn’s moons will remain pristine for future exploration. During Cassini’s final days, mission team members from all around the world gathered at NASA’s Jet Propulsion Laboratory, Pasadena, California, to celebrate the achievements of this historic mission. Photo Credit: (NASA/Joel Kowsky)

  16. Heritage Systems Engineering Lessons from NASA Deep Space Missions

    NASA Technical Reports Server (NTRS)

    Barley, Bryan; Newhouse, Marilyn; Clardy, Dennon

    2010-01-01

    In the design and development of complex spacecraft missions, project teams frequently assume the use of advanced technology systems or heritage systems to enable a mission or reduce the overall mission risk and cost. As projects proceed through the development life cycle, increasingly detailed knowledge of the advanced and heritage systems within the spacecraft and mission environment identifies unanticipated technical issues. Resolving these issues often results in cost overruns and schedule impacts. The National Aeronautics and Space Administration (NASA) Discovery & New Frontiers (D&NF) Program Office at Marshall Space Flight Center (MSFC) recently studied cost overruns and schedule delays for 5 missions. The goal was to identify the underlying causes for the overruns and delays, and to develop practical mitigations to assist the D&NF projects in identifying potential risks and controlling the associated impacts to proposed mission costs and schedules. The study found that optimistic hardware/software inheritance and technology readiness assumptions caused cost and schedule growth for all five missions studied. The cost and schedule growth was not found to be the result of technical hurdles requiring significant technology development. The projects institutional inheritance and technology readiness processes appear to adequately assess technology viability and prevent technical issues from impacting the final mission success. However, the processes do not appear to identify critical issues early enough in the design cycle to ensure project schedules and estimated costs address the inherent risks. In general, the overruns were traceable to: an inadequate understanding of the heritage system s behavior within the proposed spacecraft design and mission environment; an insufficient level of development experience with the heritage system; or an inadequate scoping of the systemwide impacts necessary to implement an advanced technology for space flight applications

  17. Scientific Investigation of the Jovian System: the Jupiter System Observer Mission Concept

    NASA Astrophysics Data System (ADS)

    Spilker, Thomas R.; Senske, D. A.; Prockter, L.; Kwok, J. H.; Tan-Wang, G. H.; SDT, JSO

    2007-10-01

    NASA's Science Mission Directorate (SMD), in efforts to start an outer solar system flagship mission in the near future, commissioned studies of mission concepts for four high-priority outer solar system destinations: Europa, the Jovian system, Titan, and Enceladus. Our team has identified and evaluated science and mission architectures to investigate major elements of the Jovian system: Jupiter, the Galilean moons, rings, and magnetosphere, and their interactions. SMD dubbed the mission concept the "Jupiter System Observer (JSO)." At abstract submission this JPL-led study is nearly complete, with final report submission in August 2007. SMD intends to select a subset of these four concepts for additional detailed study, leading to a potential flagship mission new start. A rich set of science objectives that JSO can address quite well have been identified. The highly capable science payload (including 50-cm optic), an extensive tour with multiple close flybys of Io, Europa, Ganymede and Callisto, and a significant time in orbit at Ganymede, addresses a large set of Solar System Exploration Decadal Survey (2003) and NASA Solar System Exploration Roadmap (2006) high-priority objectives. With the engineering team, the Science Definition Team evaluated a suite of mission architectures and the science they enable to arrive at two architectures that provide the best science for their estimated mission costs. This paper discusses the science objectives and operational capabilities and considerations for these mission concepts. This work was performed at JPL, APL, and other institutions under contract to NASA.

  18. NASA Program Office Technology Investments to Enable Future Missions

    NASA Astrophysics Data System (ADS)

    Thronson, Harley; Pham, Thai; Ganel, Opher

    2018-01-01

    The Cosmic Origins (COR) and Physics of the Cosmos (PCOS) Program Offices (POs) reside at NASA GSFC and implement priorities for the NASA HQ Astrophysics Division (APD). One major aspect of the POs’ activities is managing our Strategic Astrophysics Technology (SAT) program to mature technologies for future strategic missions. The Programs follow APD guidance on which missions are strategic, currently informed by the NRC’s 2010 Decadal Survey report, as well as APD’s Implementation Plan and the Astrophysics Roadmap.In preparation for the upcoming 2020 Decadal Survey, the APD has established Science and Technology Definition Teams (STDTs) to study four large-mission concepts: the Origins Space Telescope (née, Far-IR Surveyor), Habitable Exoplanet Imaging Mission, Large UV/Optical/IR Surveyor, and Lynx (née, X-ray Surveyor). The STDTs will develop the science case and design reference mission, assess technology development needs, and estimate the cost of their concept. A fifth team, the L3 Study Team (L3ST), was charged to study potential US contributions to ESA’s planned Laser Interferometer Space Antenna (LISA) gravitational-wave observatory.The POs use a rigorous and transparent process to solicit technology gaps from the scientific and technical communities, and prioritize those entries based on strategic alignment, expected impact, cross-cutting applicability, and urgency. For the past two years, the technology-gap assessments of the four STDTs and the L3ST are included in our process. Until a study team submits its final report, community-proposed changes to gaps submitted or adopted by a study team are forwarded to that study team for consideration.We discuss our technology development process, with strategic prioritization informing calls for SAT proposals and informing investment decisions. We also present results of the 2017 technology gap prioritization and showcase our current portfolio of technology development projects. To date, 96 COR and 86

  19. NASA Astrophysics Prioritizes Technology Development Funding for Strategic Missions

    NASA Astrophysics Data System (ADS)

    Thronson, Harley A.; Pham, Bruce; Ganel, Opher

    2017-01-01

    The Cosmic Origins (COR) and Physics of the Cosmos (PCOS) Program Offices (POs) reside at NASA GSFC and implement priorities for the NASA HQ Astrophysics Division (APD). One major aspect of the POs’ activities is managing our Strategic Astrophysics Technology (SAT) program to mature technologies for future strategic missions. The Programs follow APD guidance on which missions are strategic, currently informed by the NRC’s 2010 Decadal Survey report, as well as APD’s Implementation Plan and the Astrophysics Roadmap.In preparation for the upcoming 2020 Decadal Survey, the APD has established Science and Technology Definition Teams (STDTs) to study four large-mission concepts: the Origins Space Telescope, Habitable Exoplanet Imaging Mission, Large UV/Optical/IR Surveyor, and X-ray Surveyor. The STDTs will develop the science case and design reference mission, assess technology development needs, and estimate the cost of their concept. A fifth team, the L3 Study Team (L3ST), was charged to study potential US contributions to ESA’s planned L3 gravitational-wave observatory.The POs use a rigorous and transparent process to solicit technology gaps from the scientific and technical communities, and prioritize those entries based on strategic alignment, expected impact, cross-cutting applicability, and urgency. Starting in 2016, the technology-gap assessments of the four STDTs and the L3ST are included in our process. Until a study team submits its final report, community-proposed changes to gaps submitted or adopted by a study team are forwarded to that study team for consideration.We discuss our technology development process, with strategic prioritization informing calls for SAT proposals and informing investment decisions. We also present results of this year’s technology gap prioritization and showcase our current portfolio of technology development projects. To date, 77 COR and 80 PCOS SAT proposals have been received, of which 18 COR and 22 PCOS projects

  20. Technology Readiness Level Assessment Process as Applied to NASA Earth Science Missions

    NASA Technical Reports Server (NTRS)

    Leete, Stephen J.; Romero, Raul A.; Dempsey, James A.; Carey, John P.; Cline, Helmut P.; Lively, Carey F.

    2015-01-01

    Technology assessments of fourteen science instruments were conducted within NASA using the NASA Technology Readiness Level (TRL) Metric. The instruments were part of three NASA Earth Science Decadal Survey missions in pre-formulation. The Earth Systematic Missions Program (ESMP) Systems Engineering Working Group (SEWG), composed of members of three NASA Centers, provided a newly modified electronic workbook to be completed, with instructions. Each instrument development team performed an internal assessment of its technology status, prepared an overview of its instrument, and completed the workbook with the results of its assessment. A team from the ESMP SEWG met with each instrument team and provided feedback. The instrument teams then reported through the Program Scientist for their respective missions to NASA's Earth Science Division (ESD) on technology readiness, taking the SEWG input into account. The instruments were found to have a range of TRL from 4 to 7. Lessons Learned are presented; however, due to the competition-sensitive nature of the assessments, the results for specific missions are not presented. The assessments were generally successful, and produced useful results for the agency. The SEWG team identified a number of potential improvements to the process. Particular focus was on ensuring traceability to guiding NASA documents, including the NASA Systems Engineering Handbook. The TRL Workbook has been substantially modified, and the revised workbook is described.

  1. LCROSS: A High Return, Small Satellite Mission

    NASA Technical Reports Server (NTRS)

    Andrews, Daniel R.

    2010-01-01

    Early in 2006, the NASA Exploration Systems Mission Directorate (ESMD) held a competition for NASA Centers to propose innovative ideas for a secondary payload mission to launch with the Lunar Reconnaissance Orbiter (LRO) to the Moon. The successful proposal could cost no more than $80 million dollars (less was preferred), would have to be ready to launch with the LRO in 31 months, could weigh no more than 1000 kg (fuelled), and would be designated a risk-tolerant "Class D" mission. In effect, NASA was offering a fixed-price contract to the winning NASA team to stay within a cost and schedule cap by accepting an unusually elevated risk position. To address this Announcement of Opportunity to develop a cost-and-schedule-capped secondary payload mission to fly with LRO, NASA Ames Research Center (ARC) in Moffett Field, CA, USA embarked on a brainstorming effort termed "Blue Ice" in which a small team was asked to explore a number of mission scenarios that might have a good chance for success and still fit within the stated programmatic constraints. From this work, ARC developed and submitted six of the nineteen mission proposals received by ESMD from throughout the Agency, one of which was LCROSS - a collaborative effort between ARC and its industrial partner, Northrop-Grumman (NG) in Redondo Beach, CA, USA.

  2. Approach to Spacelab Payload mission management

    NASA Technical Reports Server (NTRS)

    Craft, H. G.; Lester, R. C.

    1978-01-01

    The nucleus of the approach to Spacelab Payload mission management is the establishment of a single point of authority for the entire payload on a given mission. This single point mission manager will serve as a 'broker' between the individual experiments and the STS, negotiating agreements by two-part interaction. The payload mission manager, along with a small support team, will represent the users in negotiating use of STS accommodations. He will provide the support needed by each individual experimenter to meet the scientific, technological, and applications objectives of the mission with minimum cost and maximum efficiency. The investigator will assume complete responsibility for his experiment hardware definition and development and will take an active role in the integration and operation of his experiment.

  3. The LUVOIR Mission Concept: Update and Technology Overview

    NASA Technical Reports Server (NTRS)

    Bolcar, Matthew R.

    2016-01-01

    We present an overview of the Large Ultra Violet Optical Infrared (LUVOIR) decadal mission concept study. We provide updates from recent activities of the Science and Technology Definition Team (STDT) and the Technology Working Group (TWG). We review the technology prioritization and discuss specific technology needs to enable the LUVOIR mission.

  4. STS-106 Orbit 2 Flight Team

    NASA Image and Video Library

    2000-09-14

    JSC2000-06244 (September 2000)--- Flight director Jeff Hanley, front center, and the fifty-odd flight controllers making up the ISS Orbit 2 Team pose for their group portrait in the ISS Flight Control Room of Houston's Mission Control Center.

  5. Packaging a successful NASA mission to reach a large audience within a small budget. Earth's Dynamic Space: Solar-Terrestrial Physics & NASA's Polar Mission

    NASA Astrophysics Data System (ADS)

    Fox, N. J.; Goldberg, R.; Barnes, R. J.; Sigwarth, J. B.; Beisser, K. B.; Moore, T. E.; Hoffman, R. A.; Russell, C. T.; Scudder, J.; Spann, J. F.; Newell, P. T.; Hobson, L. J.; Gribben, S. P.; Obrien, J. E.; Menietti, J. D.; Germany, G. G.; Mobilia, J.; Schulz, M.

    2004-12-01

    To showcase the on-going and wide-ranging scope of the Polar science discoveries, the Polar science team has created a one-stop shop for a thorough introduction to geospace physics, in the form of a DVD with supporting website. The DVD, Earth's Dynamic Space: Solar-Terrestrial Physics & NASA's Polar Mission, can be viewed as an end-to-end product or split into individual segments and tailored to lesson plans. Capitalizing on the Polar mission and its amazing science return, the Polar team created an exciting multi-use DVD intended for audiences ranging from a traditional classroom and after school clubs, to museums and science centers. The DVD tackles subjects such as the aurora, the magnetosphere and space weather, whilst highlighting the science discoveries of the Polar mission. This platform introduces the learner to key team members as well as the science principles. Dramatic visualizations are used to illustrate the complex principles that describe Earth’s dynamic space. In order to produce such a wide-ranging product on a shoe-string budget, the team poured through existing NASA resources to package them into the Polar story, and visualizations were created using Polar data to complement the NASA stock footage. Scientists donated their time to create and review scripts in order to make this a real team effort, working closely with the award winning audio-visual group at JHU/Applied Physics Laboratory. The team was excited to be invited to join NASA’s Sun-Earth Day 2005 E/PO program and the DVD will be distributed as part of the supporting educational packages.

  6. Launch team training system

    NASA Technical Reports Server (NTRS)

    Webb, J. T.

    1988-01-01

    A new approach to the training, certification, recertification, and proficiency maintenance of the Shuttle launch team is proposed. Previous training approaches are first reviewed. Short term program goals include expanding current training methods, improving the existing simulation capability, and scheduling training exercises with the same priority as hardware tests. Long-term goals include developing user requirements which would take advantage of state-of-the-art tools and techniques. Training requirements for the different groups of people to be trained are identified, and future goals are outlined.

  7. Designing Adaptive Instruction for Teams: A Meta-Analysis

    ERIC Educational Resources Information Center

    Sottilare, Robert A.; Shawn Burke, C.; Salas, Eduardo; Sinatra, Anne M.; Johnston, Joan H.; Gilbert, Stephen B.

    2018-01-01

    The goal of this research was the development of a practical architecture for the computer-based tutoring of teams. This article examines the relationship of team behaviors as antecedents to successful team performance and learning during adaptive instruction guided by Intelligent Tutoring Systems (ITSs). Adaptive instruction is a training or…

  8. Kepler's Third Law and NASA's "Kepler Mission"

    ERIC Educational Resources Information Center

    Gould, Alan; Komatsu, Toshi; DeVore, Edna; Harman, Pamela; Koch, David

    2015-01-01

    NASA's "Kepler Mission" has been wildly successful in discovering exoplanets. This paper summarizes the mission goals, briefly explains the transit method of finding exoplanets and design of the mission, provides some key findings, and describes useful education materials available at the "Kepler" website.

  9. Astronaut Norman Thagard rests on middeck while other team is on duty

    NASA Image and Video Library

    1985-05-03

    Astronaut Norman E. Thagard, mission specialist for the "silver" team, rests on the middeck while the "gold" team is on duty in the science module. Don L. Lind, left, "gold" team member, meanwhile participates in autogenic feedback training (AFT), designed to help flight crewmembers overcome the effects of zero-gravity adaptation.

  10. Astronaut Norman Thagard rests on middeck while other team is on duty

    NASA Technical Reports Server (NTRS)

    1985-01-01

    Astronaut Norman E. Thagard, mission specialist for the 'silver' team, rests on the middeck while the 'gold' team is on duty in the science module. Don L. Lind, left, 'gold' team member, meanwhile participates in autogenic feedback training (AFT), designed to help flight crewmembers overcome the effects of zero-gravity adaptation.

  11. NASA Exploration Team (NExT) In-Space Transportation Overview

    NASA Technical Reports Server (NTRS)

    Drake, Bret G.; Cooke, Douglas R.; Kos, Larry D.; Brady, Hugh J. (Technical Monitor)

    2002-01-01

    This presentation provides an overview of NASA Exploration Team's (NEXT) vision of in-space transportation in the future. Hurdles facing in-space transportation include affordable power sources, crew health and safety, optimized robotic and human operations and space systems performance. Topics covered include: exploration of Earth's neighborhood, Earth's neighborhood architecture and elements, Mars mission trajectory options, delta-v variations, Mars mission duration options, Mars mission architecture, nuclear electric propulsion advantages and miscellaneous technology needs.

  12. Castalia: A European Mission to a Main Belt Comet

    NASA Astrophysics Data System (ADS)

    Snodgrass, Colin; Castalia mission science Team

    2013-10-01

    Main Belt Comets (MBCs) are a newly identified population, with stable asteroid-like orbits in the outer main belt and a comet-like appearance. It is believed that they survived the age of the solar system in a dormant state and that their activity occurred only recently. Water ice is the only volatile expected to survive, and only when buried under an insulating surface. Excavation by impact could bring the water ice (closer) to the surface and trigger the start of MBC activity. The specific science goals of the Castalia mission are: 1. Characterize a new Solar System family, the MBCs, by in-situ investigation 2. Understand the physics of activity on MBCs 3. Directly detect water in the asteroid belt 4. Test if MBCs are a viable source for Earth’s water 5. Use MBCs as tracers of planetary system formation and evolution These goals can be achieved by a spacecraft designed to rendezvous with and orbit an MBC for some months, arriving before the active period begins for mapping before directly sampling the gas and dust released during the active phase. Given the low level of activity of MBCs, and the expectation that their activity comes from only a localized patch on the surface, the orbiting spacecraft will have to be able to maintain a very close orbit over extended periods - the Castalia plan envisages an orbiter capable of ‘hovering’ autonomously at distances of only a few km from the surface of the MBC. The straw-man instrument payload is made up of: - Visible and near-infrared spectral imager - Thermal infrared imager - Radio science - Dust impact detector - Dust composition analyzer - Neutral/ion mass spectrometer - Magnetometer - Plasma package In addition to this, the option of a surface science package is being considered. At the moment MBC 133P/Elst-Pizarro is the best-known target for such a mission. A design study for the Castalia mission has been carried out in partnership between the science team, DLR and OHB Systems. This study looked at

  13. A Participating Scientist Program for the STARDUST Mission

    NASA Technical Reports Server (NTRS)

    Morgan, T. H.; Geldazhler, B. G.

    2003-01-01

    It is the Policy of NASA s Office of Space Science to emphasize and encourage the addition of Participating Scientist Programs (PSP s) to broaden the scientific impact of missions. A Participating Scientist Program for the STARDUST Mission: STARDUST is the fourth Discovery mission, and it is the first sample return mission selected within the Discovery Program. The STARDUST Spacecraft will fly through the coma of comet PIwildt-2 in early January 2004, and return the samples to the Earth in January 2006. The Principal Investigator of the STARDUST mission, Dr. Donald Brownlee, has generously requested the implementation of a PSP for STARDUST in order to provide more community participation in the initial characterization and analysis of the samples from PIwildt-2. In particular participating scientists will fill out the membership of the Preliminary Examination Team (PET) called for in the original 1994 STARDUST proposal accepted by NASA in 1995. The work of the PET will be organized around major subdiscipline areas such as mineralogy and petrology, isotopic abundances, and elemental composition. There will be leaders for each of these areas, and also a number of team members within each. Support will be commensurate with the level of participation.

  14. Green Propellant Infusion Mission Program Development and Technology Maturation

    NASA Technical Reports Server (NTRS)

    McLean, Christopher H.; Deininger, William D.; Joniatis, John; Aggarwal, Pravin K.; Spores, Ronald A.; Deans, Matthew; Yim, John T.; Bury, Kristen; Martinez, Jonathan; Cardiff, Eric H.; hide

    2014-01-01

    The NASA Space Technology Mission Directorate's (STMD) Green Propellant Infusion Mission (GPIM) Technology Demonstration Mission (TDM) is comprised of a cross-cutting team of domestic spacecraft propulsion and storable green propellant technology experts. This TDM is led by Ball Aerospace & Technologies Corp. (BATC), who will use their BCP- 100 spacecraft to carry a propulsion system payload consisting of one 22 N thruster for primary divert (DeltaV) maneuvers and four 1 N thrusters for attitude control, in a flight demonstration of the AF-M315E technology. The GPIM project has technology infusion team members from all three major market sectors: Industry, NASA, and the Department of Defense (DoD). The GPIM project team includes BATC, includes Aerojet Rocketdyne (AR), Air Force Research Laboratory, Aerospace Systems Directorate, Edwards AFB (AFRL), NASA Glenn Research Center (GRC), NASA Kennedy Space Center (KSC), and NASA Goddard Space Flight Center (GSFC). STMD programmatic and technology oversight is provided by NASA Marshall Space Flight Center. The GPIM project shall fly an operational AF-M315E green propulsion subsystem on a Ball-built BCP-100 spacecraft.

  15. U.S. Army dietitians deploy in support of Cobra Gold: a humanitarian mission.

    PubMed

    Kemmer, T; Podojil, R; Sweet, L E

    1999-07-01

    Dietitians are multifunctional and play an important role in humanitarian missions as educators, planners, and consultants. Three dietitians deployed to Thailand in support of the 16th Annual Joint and Combined Exercise, Cobra Gold 1997. The goal of the Medical Civic Assistance Program (MEDCAP) was to promote long-term public health improvements in rural Thai villages. The dietitians counseled 140 patients and taught an additional 5,300 individuals during nutrition classes. The primary nutrition-related clinical diagnoses included malnutrition, anemia, diabetes, hypertension, goiter, and poor appetite. The dietitian who deployed as the medical planner and MEDCAP executive officer facilitated coordination and planning for all phases of the MEDCAP operation. The teams were made up of U.S. and Thai military forces and Thai civilian medical personnel. The mission requirements were established with the Royal Thai Supreme Command, Thai governors, Ministry of Public Health officers, military and medical officers, and veterinarians of the three provinces.

  16. Europa Geophysical Explorer Mission Concept Studies

    NASA Astrophysics Data System (ADS)

    Green, J. R.; Abelson, R. D.; Smythe, W.; Spilker, T. R.; Shirley, J. H.

    2005-12-01

    The Strategic Road Map for Solar System Exploration recommended in May 2005 that NASA implement the Europa Geophysical Explorer (EGE) as a Flagship mission early in the next decade. This supported the recommendations of the National Research Council's Solar System Decadal Survey and the priorities of the Outer Planets Assessment Group (OPAG). The Europa Geophysical Explorer would: (1) Characterize tidal deformations of the surface of Europa and surface geology, to confirm the presence of a subsurface ocean; (2) Measure the three-dimensional structure and distribution of subsurface water; and (3) Determine surface composition from orbit, and potentially, prebiotic chemistry, in situ. As the next step in Europa exploration, EGE would build on previous Europa Orbiter concepts, for example, the original Europa Orbiter and the Jupiter Icy Moons Orbiter (JIMO). As well, a new set of draft Level One Requirements, provided by NASA sponsors, guided the concept development. These requirements included: (1) Earliest Launch: 2012; (2) Launch Vehicle: Delta IV Heavy or Atlas V; (3) Primary Propulsion: Chemical; (4) Power: Radioisotope Power System (RPS); (4) Orbital Mission: 30 days minimum to meet orbital science objectives; and (5) Earth Gravity Assists: Allowed. The previous studies and the new requirements contributed to the development of several scientifically capable and relatively mass-rich mission options. In particular, Earth-gravity assists (EGA) were allowed, resulting in an increased delivered mass. As well, there have been advances in radiation-hardened components and subsystems, due to the investments from the X-2000 technology program and JIMO. Finally, developments in radioisotope power systems (RPS) have added to the capability and reliability of the mission. Several potential mission options were explored using a variety of trade study methods, ranging from the work of the JPL EGE Team of scientists and engineers in partnership with the OPAG Europa Sub

  17. Rosetta science operations in support of the Philae mission

    NASA Astrophysics Data System (ADS)

    Ashman, Mike; Barthélémy, Maud; O`Rourke, Laurence; Almeida, Miguel; Altobelli, Nicolas; Costa Sitjà, Marc; García Beteta, Juan José; Geiger, Bernhard; Grieger, Björn; Heather, David; Hoofs, Raymond; Küppers, Michael; Martin, Patrick; Moissl, Richard; Múñoz Crego, Claudio; Pérez-Ayúcar, Miguel; Sanchez Suarez, Eduardo; Taylor, Matt; Vallat, Claire

    2016-08-01

    The international Rosetta mission was launched on 2nd March 2004 and after its ten year journey, arrived at its target destination of comet 67P/Churyumov-Gerasimenko, during 2014. Following the January 2014 exit from a two and half year hibernation period, Rosetta approached and arrived at the comet in August 2014. In November 2014, the Philae lander was deployed from Rosetta onto the comet's surface after which the orbiter continued its approximately one and a half year comet escort phase. The Rosetta Science Ground Segment's primary roles within the project are to support the Project Scientist and the Science Working Team, in order to ensure the coordination, development, validation and delivery of the desired science operations plans and their associated operational products throughout the mission., whilst also providing support to the Principle Investigator teams (including the Philae lander team) in order to ensure the provision of adequate data to the Planetary Science Archive. The lead up to, and execution of, the November 2014 Philae landing, and the subsequent Philae activities through 2015, have presented numerous unique challenges to the project teams. This paper discusses these challenges, and more specifically, their impact on the overall mission science planning activities. It details how the Rosetta Science Ground Segment has addressed these issues in collaboration with the other project teams in order to accommodate Philae operations within the continually evolving Rosetta science planning process.

  18. Landsat Data Continuity Mission (LDCM) Flight Dynamics System (FDS)

    NASA Technical Reports Server (NTRS)

    Good, Susan M.; Nicholson, Ann M.

    2012-01-01

    The Landsat Data Continuity Mission (LDCM) will be launched in January 2013 to continue the legacy of Landsat land imagery collection that has been on-going for the past 40 years. While the overall mission and science goals are designed to produce the SAME data over the years, the ground systems designed to support the mission objectives have evolved immensely. The LDCM Flight Dynamics System (FDS) currently being tested and deployed for operations is highly automated and well integrated with the other ground system elements. The FDS encompasses the full suite of flight dynamics functional areas, including orbit and attitude determination and prediction, orbit and attitude maneuver planning and execution, and planning product generation. The integration of the orbit, attitude, maneuver, and products functions allows a very smooth flow for daily operations support with minimal input needed from the operator. The system also provides a valuable real-time component that monitors the on-board orbit and attitude during every ground contact and will autonomously alert the Flight Operations Team (FOT) personnel when any violations are found. This paper provides an overview of the LDCM Flight Dynamics System and a detailed description of how it is used to support space operations. For the first time on a Goddard Space Flight Center (GSFC)-managed mission, the ground attitude and orbits systems are fully integrated into a cohesive package. The executive engine of the FDS permits three levels of automation: low, medium, and high. The high-level, which will be the standard mode for LDCM, represents nearly lights-out operations. The paper provides an in-depth look at these processes within the FDS in support of LDCM in all mission phases.

  19. Space Mission Concept Development Using Concept Maturity Levels

    NASA Technical Reports Server (NTRS)

    Wessen, Randii R.; Borden, Chester; Ziemer, John; Kwok, Johnny

    2013-01-01

    Over the past five years, pre-project formulation experts at the Jet Propulsion Laboratory (JPL) has developed and implemented a method for measuring and communicating the maturity of space mission concepts. Mission concept development teams use this method, and associated tools, prior to concepts entering their Formulation Phases (Phase A/B). The organizing structure is Concept Maturity Level (CML), which is a classification system for characterizing the various levels of a concept's maturity. The key strength of CMLs is the ability to evolve mission concepts guided by an incremental set of assessment needs. The CML definitions have been expanded into a matrix form to identify the breadth and depth of analysis needed for a concept to reach a specific level of maturity. This matrix enables improved assessment and communication by addressing the fundamental dimensions (e.g., science objectives, mission design, technical risk, project organization, cost, export compliance, etc.) associated with mission concept evolution. JPL's collaborative engineering, dedicated concept development, and proposal teams all use these and other CML-appropriate design tools to advance their mission concept designs. This paper focuses on mission concept's early Pre-Phase A represented by CMLs 1- 4. The scope was limited due to the fact that CMLs 5 and 6 are already well defined based on the requirements documented in specific Announcement of Opportunities (AO) and Concept Study Report (CSR) guidelines, respectively, for competitive missions; and by NASA's Procedural Requirements NPR 7120.5E document for Projects in their Formulation Phase.

  20. The Mission of Institutional Research.

    ERIC Educational Resources Information Center

    Thorpe, Stephen W.

    Mission statements can provide a useful vehicle to communicate the purposes, goals, and objectives for functional units within organizations. This paper studied the extent to which institutional research offices utilize mission statements to communicate office functions. These functions were identified through content analysis, using nine specific…

  1. Cassini End of Mission Press Conference

    NASA Image and Video Library

    2017-09-15

    Cassini project scientist at JPL, Linda Spilker, center, speaks about a montage of images, made from data obtained by Cassini's visual and infrared mapping spectrometer, shows the location on Saturn where the NASA spacecraft entered Saturn's atmosphere, Friday, Sept. 15, 2017 during a press conference at NASA's Jet Propulsion Laboratory in Pasadena, California. Cassini program manager at JPL, Earl Maize, left, and spacecraft operations team manager for the Cassini mission at Saturn, Julie Webster, right, also participated in the press conference. Since its arrival in 2004, the Cassini-Huygens mission has been a discovery machine, revolutionizing our knowledge of the Saturn system and captivating us with data and images never before obtained with such detail and clarity. On Sept. 15, 2017, operators deliberately plunged the spacecraft into Saturn, as Cassini gathered science until the end. Loss of contact with the Cassini spacecraft occurred at 7:55 a.m. EDT (4:55 a.m. PDT). The “plunge” ensures Saturn’s moons will remain pristine for future exploration. During Cassini’s final days, mission team members from all around the world gathered at NASA’s Jet Propulsion Laboratory, Pasadena, California, to celebrate the achievements of this historic mission. Photo Credit: (NASA/Joel Kowsky)

  2. How to Get It -- Step 2: Meet the Palliative Care Team

    MedlinePlus

    ... a Provider 3. Meet the Team Palliative Care Team The palliative care team will spend a lot of time with you ... your goals. But what should you ask the team during the meeting? Here are some suggestions: What ...

  3. Deep Space Habitat Team: HEFT Phase 2 Effects

    NASA Technical Reports Server (NTRS)

    Toups, Larry D.; Smitherman, David; Shyface, Hilary; Simon, Matt; Bobkill, Marianne; Komar, D. R.; Guirgis, Peggy; Bagdigian, Bob; Spexarth, Gary

    2011-01-01

    HEFT was a NASA-wide team that performed analyses of architectures for human exploration beyond LEO, evaluating technical, programmatic, and budgetary issues to support decisions at the highest level of the agency in HSF planning. HEFT Phase I (April - September, 2010) and Phase II (September - December, 2010) examined a broad set of Human Exploration of Near Earth Objects (NEOs) Design Reference Missions (DRMs), evaluating such factors as elements, performance, technologies, schedule, and cost. At end of HEFT Phase 1, an architecture concept known as DRM 4a represented the best available option for a full capability NEO mission. Within DRM4a, the habitation system was provided by Deep Space Habitat (DSH), Multi-Mission Space Exploration Vehicle (MMSEV), and Crew Transfer Vehicle (CTV) pressurized elements. HEFT Phase 2 extended DRM4a, resulting in DRM4b. Scrubbed element-level functionality assumptions and mission Concepts of Operations. Habitation Team developed more detailed concepts of the DSH and the DSH/MMSEV/CTV Conops, including functionality and accommodations, mass & volume estimates, technology requirements, and DDT&E costs. DRM 5 represented an effort to reduce cost by scaling back on technologies and eliminating the need for the development of an MMSEV.

  4. Apollo 15 Mission Report

    NASA Technical Reports Server (NTRS)

    1971-01-01

    A detailed discussion is presented of the Apollo 15 mission, which conducted exploration of the moon over longer periods, greater ranges, and with more instruments of scientific data acquisition than previous missions. The topics include trajectory, lunar surface science, inflight science and photography, command and service module performance, lunar module performance, lunar surface operational equipment, pilot's report, biomedical evaluation, mission support performance, assessment of mission objectives, launch phase summary, anomaly summary, and vehicle and equipment descriptions. The capability of transporting larger payloads and extending time on the moon were demonstrated. The ground-controlled TV camera allowed greater real-time participation by earth-bound personnel. The crew operated more as scientists and relied more on ground support team for systems monitoring. The modified pressure garment and portable life support system provided better mobility and extended EVA time. The lunar roving vehicle and the lunar communications relay unit were also demonstrated.

  5. Cassini End of Mission

    NASA Image and Video Library

    2017-09-14

    Cassini program manager at JPL, Earl Maize, watches monitors in mission control of the Space Flight Operations Center as the Cassini spacecraft begins downlink data through NASA's Deep Space Network, Thursday, Sept. 14, 2017 at NASA's Jet Propulsion Laboratory in Pasadena, California. Since its arrival in 2004, the Cassini-Huygens mission has been a discovery machine, revolutionizing our knowledge of the Saturn system and captivating us with data and images never before obtained with such detail and clarity. On Sept. 15, 2017, operators will deliberately plunge the spacecraft into Saturn, as Cassini gathered science until the end. The “plunge” ensures Saturn’s moons will remain pristine for future exploration. During Cassini’s final days, mission team members from all around the world gathered at NASA’s Jet Propulsion Laboratory, Pasadena, California, to celebrate the achievements of this historic mission. Photo Credit: (NASA/Joel Kowsky)

  6. Cassini End of Mission

    NASA Image and Video Library

    2017-09-15

    Cassini program manager at JPL, Earl Maize, is seen in mission control as he monitors the Cassini spacecraft, Friday, Sept. 15, 2017 at NASA's Jet Propulsion Laboratory in Pasadena, California. Since its arrival in 2004, the Cassini-Huygens mission has been a discovery machine, revolutionizing our knowledge of the Saturn system and captivating us with data and images never before obtained with such detail and clarity. On Sept. 15, 2017, operators deliberately plunged the spacecraft into Saturn, as Cassini gathered science until the end. Loss of contact with the Cassini spacecraft occurred at 7:55 a.m. EDT (4:55 a.m. PDT). The “plunge” ensures Saturn’s moons will remain pristine for future exploration. During Cassini’s final days, mission team members from all around the world gathered at NASA’s Jet Propulsion Laboratory, Pasadena, California, to celebrate the achievements of this historic mission. Photo Credit: (NASA/Joel Kowsky)

  7. Cassini End of Mission

    NASA Image and Video Library

    2017-09-15

    A monitor in mission control shows the time remaining until Cassini makes its final plunge into Saturn, Friday, Sept. 15, 2017 at NASA's Jet Propulsion Laboratory in Pasadena, California. Since its arrival in 2004, the Cassini-Huygens mission has been a discovery machine, revolutionizing our knowledge of the Saturn system and captivating us with data and images never before obtained with such detail and clarity. On Sept. 15, 2017, operators deliberately plunged the spacecraft into Saturn, as Cassini gathered science until the end. Loss of contact with the Cassini spacecraft occurred at 7:55 a.m. EDT (4:55 a.m. PDT). The “plunge” ensures Saturn’s moons will remain pristine for future exploration. During Cassini’s final days, mission team members from all around the world gathered at NASA’s Jet Propulsion Laboratory, Pasadena, California, to celebrate the achievements of this historic mission. Photo Credit: (NASA/Joel Kowsky)

  8. Remote Infrared Imaging of the Space Shuttle During Hypersonic Flight: HYTHIRM Mission Operations and Coordination

    NASA Technical Reports Server (NTRS)

    Schwartz, Richard J.; McCrea, Andrew C.; Gruber, Jennifer R.; Hensley, Doyle W.; Verstynen, Harry A.; Oram, Timothy D.; Berger, Karen T.; Splinter, Scott C.; Horvath, Thomas J.; Kerns, Robert V.

    2011-01-01

    The Hypersonic Thermodynamic Infrared Measurements (HYTHIRM) project has been responsible for obtaining spatially resolved, scientifically calibrated in-flight thermal imagery of the Space Shuttle Orbiter during reentry. Starting with STS-119 in March of 2009 and continuing through to the majority of final flights of the Space Shuttle, the HYTHIRM team has to date deployed during seven Shuttle missions with a mix of airborne and ground based imaging platforms. Each deployment of the HYTHIRM team has resulted in obtaining imagery suitable for processing and comparison with computational models and wind tunnel data at Mach numbers ranging from over 18 to under Mach 5. This paper will discuss the detailed mission planning and coordination with the NASA Johnson Space Center Mission Control Center that the HYTHIRM team undergoes to prepare for and execute each mission.

  9. The Jupiter System Observer Mission Concept: Scientific Investigation of the Jovian System

    NASA Astrophysics Data System (ADS)

    Spilker, T. R.; Senske, D. A.; Prockter, L.; Kwok, J. H.; Tan-Wang, G. H.; Sdt, J.

    2007-12-01

    NASA's Science Mission Directorate (SMD), in efforts to start an outer solar system flagship mission in the near future, commissioned studies of mission concepts for four high-priority outer solar system destinations: Europa, the Jovian system, Titan, and Enceladus. Our team has identified and evaluated science and mission architectures to investigate major elements of the Jovian system: Jupiter, the Galilean moons, rings, and magnetosphere, and their interactions. SMD dubbed the mission concept the "Jupiter System Observer (JSO)." This JPL-led study's final report is now complete and was submitted in August 2007. SMD intends to select a subset of these four concepts for additional detailed study, leading to a potential flagship mission new start. The study's NASA-appointed, multi-institutional Science Definition Team (SDT) identified a rich set of science objectives that JSO can address quite well. The highly capable science payload (including ~50-cm optics), an extensive tour with multiple close flybys of Io, Europa, Ganymede and Callisto, and a significant time in orbit at Ganymede, addresses a large set of Solar System Exploration Decadal Survey (2003) and NASA Solar System Exploration Roadmap (2006) high-priority objectives. With the engineering team, the SDT evaluated a suite of mission architectures and the science they enable to arrive at two architectures that provide the best science for their estimated mission costs. This paper discusses the science objectives and operational capabilities and considerations for these mission concepts, and some options available for emphasizing specific science objectives. This work was performed at JPL, APL, and other institutions under contract to NASA.

  10. Nutrient and Sediment Reductions from Algal Flow-Way Technologies: Recommendations to the Chesapeake Bay Program's Water Quality Goal Implementation Team from the Algal Flow-Way Technologies BMP Expert Panel

    USDA-ARS?s Scientific Manuscript database

    The Chesapeake Stormwater Network hosted a workshop on July, 2012 to discuss the potential nutrient reductions from emerging stormwater technologies including algal flow-way technologies (AFTs). Workshop participants recommended the Chesapeake Bay Program’s Water Quality Goal Implementation Team(WQ...

  11. EVAL mission requirements, phase 1

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The aspects of NASA's applications mission were enhanced by utilization of shuttle/spacelab, and payload groupings which optimize the cost of achieving the mission goals were defined. Preliminary Earth Viewing Application Laboratory (EVAL) missions, experiments, sensors, and sensor groupings were developed. The major technological EVAL themes and objectives which NASA will be addressing during the 1980 to 2,000 time period were investigated. Missions/experiments which addressed technique development, sensor development, application development, and/or operational data collection were considered as valid roles for EVAL flights.

  12. [Team Development in Medical Rehabilitation: Concept and Evaluation of a Team Intervention].

    PubMed

    Körner, M; Luzay, L; Becker, S; Rundel, M; Müller, C; Zimmermann, L

    2016-04-01

    Interprofessional collaboration is a main precondition of successful treatment in rehabilitation. In order to improve interprofessional collaboration, a clinic-specific, goal- and solution-oriented and systemic team development approach was designed. The aim of the study is the evaluation of this approach. A multi-centre cluster-randomized controlled study with staff questionnaires. The team development could be implemented successfully in 4 of 5 clinics and led to significant improvements in team organisation, willingness to accept responsibility and knowledge integration. The effects are small and are caused by the opposed development of intervention and control group. The team development approach can be recommended for rehabilitation practice. A train-the-trainer approach will be developed and further studies are planned in order to disseminate the approach and to investigate the conditions of implementation. © Georg Thieme Verlag KG Stuttgart · New York.

  13. Developing Software for NASA Missions in the New Millennia

    NASA Technical Reports Server (NTRS)

    Truszkowski, Walt; Rash, James; Rouff, Christopher; Hinchey, Mike

    2004-01-01

    NASA is working on new mission concepts for exploration of the solar system. The concepts for these missions include swarms of hundreds of cooperating intelligent spacecraft which will be able to work in teams and gather more data than current single spacecraft missions. These spacecraft will not only have to operate independently for long periods of time on their own and in teams, but will also need to have autonomic properties of self healing, self configuring, self optimizing and self protecting for them to survive in the harsh space environment. Software for these types of missions has never been developed before and represents some of the challenges of software development in the new millennia. The Autonomous Nano Technology Swarm (ANTS) mission is an example of one of the swarm missions NASA is considering. The ANTS mission will use a swarm of one thousand pico-spacecraft that weigh less than five pounds. Using an insect colony analog, ANTS will explore the asteroid belt and catalog the mass, density, morphology, and chemical composition of the asteroids. Due to the size of the spacecraft, each will only carry a single miniaturized science instrument which will require them to cooperate in searching for asteroids that are of scientific interest. This article also discusses the ANTS mission, the properties the spacecraft will need and how that will effect future software development.

  14. Improving Caregivers' Perceptions Regarding Patient Goals of Care/End-of-Life Issues for the Multidisciplinary Critical Care Team.

    PubMed

    Wessman, Brian T; Sona, Carrie; Schallom, Marilyn

    2017-01-01

    With population aging and growth, use of critical care medicine at the end of life continues to rise, while many critical care providers are not adequately trained regarding goals of care/end-of-life (GOC/EOL) issues. A multidisciplinary intensive care unit (ICU) team intervention regarding GOC/EOL communication will enhance the clinical abilities of all critical care providers when discussing GOC/EOL issues and increase ICU staff comfort level while improving transitions for patients to a comfort care approach. This study was a preintervention/postintervention survey evaluation. This study was conducted at an academic tertiary surgical burn trauma ICU. The intervention was provided to nursing, ancillary staff, house staff, and attending physicians. An initial survey was circulated among the critical care staff for baseline expectations, satisfaction, and understanding of GOC/EOL care. A robust intervention was begun including the creation of a multidisciplinary GOC/EOL team, communication tools for providers, patient-family pamphlets, standardized EOL order sets, and formalized didactic sessions. Subsequently, the same survey was circulated and compared to baseline data. Preintervention/postintervention survey data were reviewed and statistically analyzed. Our survey response rate for preintervention/postintervention was 50.4% and 36.1%, respectively. The intervention generated heightened interest in improving family communication and provided focal direction to foster this growth. Based on the serial surveys regarding our intervention, statistically significant staff improvements were seen in "work stress" (P = .04), "EOL information" (P = .006), and "space allotment" (P = .001). Improved congruence of families and health care providers regarding decision over intensity of care was also noted. We created a novel unit-based multidisciplinary program for improved EOL/GOC approaches in the critical care setting. A similarly formatted program could be adapted by

  15. Implicit Coordination Strategies for Effective Team Communication.

    PubMed

    Butchibabu, Abhizna; Sparano-Huiban, Christopher; Sonenberg, Liz; Shah, Julie

    2016-06-01

    We investigated implicit communication strategies for anticipatory information sharing during team performance of tasks with varying degrees of complexity. We compared the strategies used by teams with the highest level of performance to those used by the lowest-performing teams to evaluate the frequency and methods of communications used as a function of task structure. High-performing teams share information by anticipating the needs of their teammates rather than explicitly requesting the exchange of information. As the complexity of a task increases to involve more interdependence among teammates, the impact of coordination on team performance also increases. This observation motivated us to conduct a study of anticipatory information sharing as a function of task complexity. We conducted an experiment in which 13 teams of four people performed collaborative search-and-deliver tasks with varying degrees of complexity in a simulation environment. We elaborated upon prior characterizations of communication as implicit versus explicit by dividing implicit communication into two subtypes: (a) deliberative/goal information and (b) reactive status updates. We then characterized relationships between task structure, implicit communication, and team performance. We found that the five teams with the fastest task completion times and lowest idle times exhibited higher rates of deliberative communication versus reactive communication during high-complexity tasks compared with the five teams with the slowest completion times and longest idle times (p = .039). Teams in which members proactively communicated information about their next goal to teammates exhibited improved team performance. The findings from our work can inform the design of communication strategies for team training to improve performance of complex tasks. © 2016, Human Factors and Ergonomics Society.

  16. Cassini End of Mission Preview

    NASA Image and Video Library

    2017-09-13

    Director of NASA's Planetary Science Division, Jim Green, is seen during a press conference previewing Cassini's End of Mission, Wednesday, Sept. 13, 2017 at NASA's Jet Propulsion Laboratory in Pasadena, California. Since its arrival in 2004, the Cassini-Huygens mission has been a discovery machine, revolutionizing our knowledge of the Saturn system and captivating us with data and images never before obtained with such detail and clarity. On Sept. 15, 2017, operators will deliberately plunge the spacecraft into Saturn, as Cassini gathered science until the end. The “plunge” ensures Saturn’s moons will remain pristine for future exploration. During Cassini’s final days, mission team members from all around the world gathered at NASA’s Jet Propulsion Laboratory, Pasadena, California, to celebrate the achievements of this historic mission. Photo Credit: (NASA/Joel Kowsky)

  17. Cassini End of Mission Preview

    NASA Image and Video Library

    2017-09-13

    Cassini program manager at JPL, Earl Maize is seen during a press conference previewing Cassini's End of Mission, Wednesday, Sept. 13, 2017 at NASA's Jet Propulsion Laboratory in Pasadena, California. Since its arrival in 2004, the Cassini-Huygens mission has been a discovery machine, revolutionizing our knowledge of the Saturn system and captivating us with data and images never before obtained with such detail and clarity. On Sept. 15, 2017, operators will deliberately plunge the spacecraft into Saturn, as Cassini gathered science until the end. The “plunge” ensures Saturn’s moons will remain pristine for future exploration. During Cassini’s final days, mission team members from all around the world gathered at NASA’s Jet Propulsion Laboratory, Pasadena, California, to celebrate the achievements of this historic mission. Photo Credit: (NASA/Joel Kowsky)

  18. Cassini End of Mission Preview

    NASA Image and Video Library

    2017-09-13

    Preston Dyches, media relations specialist at NASA's Jet Propulsion Laboratory, during a press conference previewing Cassini's End of Mission, Wednesday, Sept. 13, 2017 at NASA's Jet Propulsion Laboratory in Pasadena, California. Since its arrival in 2004, the Cassini-Huygens mission has been a discovery machine, revolutionizing our knowledge of the Saturn system and captivating us with data and images never before obtained with such detail and clarity. On Sept. 15, 2017, operators will deliberately plunge the spacecraft into Saturn, as Cassini gathered science until the end. The “plunge” ensures Saturn’s moons will remain pristine for future exploration. During Cassini’s final days, mission team members from all around the world gathered at NASA’s Jet Propulsion Laboratory, Pasadena, California, to celebrate the achievements of this historic mission. Photo Credit: (NASA/Joel Kowsky)

  19. Cassini End of Mission Preview

    NASA Image and Video Library

    2017-09-13

    Cassini program manager at JPL, Earl Maize speaks during a press conference previewing Cassini's End of Mission, Wednesday, Sept. 13, 2017 at NASA's Jet Propulsion Laboratory in Pasadena, California. Since its arrival in 2004, the Cassini-Huygens mission has been a discovery machine, revolutionizing our knowledge of the Saturn system and captivating us with data and images never before obtained with such detail and clarity. On Sept. 15, 2017, operators will deliberately plunge the spacecraft into Saturn, as Cassini gathered science until the end. The “plunge” ensures Saturn’s moons will remain pristine for future exploration. During Cassini’s final days, mission team members from all around the world gathered at NASA’s Jet Propulsion Laboratory, Pasadena, California, to celebrate the achievements of this historic mission. Photo Credit: (NASA/Joel Kowsky)

  20. Cassini End of Mission Preview

    NASA Image and Video Library

    2017-09-13

    A model of the Cassini-Huygens spacecraft is seen during a press conference previewing Cassini's End of Mission, Wednesday, Sept. 13, 2017 at NASA's Jet Propulsion Laboratory in Pasadena, California. Since its arrival in 2004, the Cassini-Huygens mission has been a discovery machine, revolutionizing our knowledge of the Saturn system and captivating us with data and images never before obtained with such detail and clarity. On Sept. 15, 2017, operators will deliberately plunge the spacecraft into Saturn, as Cassini gathered science until the end. The “plunge” ensures Saturn’s moons will remain pristine for future exploration. During Cassini’s final days, mission team members from all around the world gathered at NASA’s Jet Propulsion Laboratory, Pasadena, California, to celebrate the achievements of this historic mission. Photo Credit: (NASA/Joel Kowsky)

  1. Cassini End of Mission Preview

    NASA Image and Video Library

    2017-09-13

    Cassini project scientist at JPL, Linda Spilker speaks during a press conference previewing Cassini's End of Mission, Wednesday, Sept. 13, 2017 at NASA's Jet Propulsion Laboratory in Pasadena, California. Since its arrival in 2004, the Cassini-Huygens mission has been a discovery machine, revolutionizing our knowledge of the Saturn system and captivating us with data and images never before obtained with such detail and clarity. On Sept. 15, 2017, operators will deliberately plunge the spacecraft into Saturn, as Cassini gathered science until the end. The “plunge” ensures Saturn’s moons will remain pristine for future exploration. During Cassini’s final days, mission team members from all around the world gathered at NASA’s Jet Propulsion Laboratory, Pasadena, California, to celebrate the achievements of this historic mission. Photo Credit: (NASA/Joel Kowsky)

  2. Cassini End of Mission Preview

    NASA Image and Video Library

    2017-09-13

    director of NASA's Planetary Science Division, Jim Green answers questions a press conference previewing Cassini's End of Mission, Wednesday, Sept. 13, 2017 at NASA's Jet Propulsion Laboratory in Pasadena, California. Since its arrival in 2004, the Cassini-Huygens mission has been a discovery machine, revolutionizing our knowledge of the Saturn system and captivating us with data and images never before obtained with such detail and clarity. On Sept. 15, 2017, operators will deliberately plunge the spacecraft into Saturn, as Cassini gathered science until the end. The “plunge” ensures Saturn’s moons will remain pristine for future exploration. During Cassini’s final days, mission team members from all around the world gathered at NASA’s Jet Propulsion Laboratory, Pasadena, California, to celebrate the achievements of this historic mission. Photo Credit: (NASA/Joel Kowsky)

  3. Cassini End of Mission Preview

    NASA Image and Video Library

    2017-09-13

    Cassini program manager at JPL, Earl Maize, speaks during a press conference previewing Cassini's End of Mission, Wednesday, Sept. 13, 2017 at NASA's Jet Propulsion Laboratory in Pasadena, California. Since its arrival in 2004, the Cassini-Huygens mission has been a discovery machine, revolutionizing our knowledge of the Saturn system and captivating us with data and images never before obtained with such detail and clarity. On Sept. 15, 2017, operators will deliberately plunge the spacecraft into Saturn, as Cassini gathered science until the end. The “plunge” ensures Saturn’s moons will remain pristine for future exploration. During Cassini’s final days, mission team members from all around the world gathered at NASA’s Jet Propulsion Laboratory, Pasadena, California, to celebrate the achievements of this historic mission. Photo Credit: (NASA/Joel Kowsky)

  4. Mission possible: Building an effective business continuity team in seven steps.

    PubMed

    Porter, David

    2016-01-01

    Several books and studies exist on the creation, development and benefits of high-performing teams; many others offer insights into the business continuity management (BCM) discipline, crisis response and planning. Very rarely, however, do they cover both. This paper will explore the seven main development areas that helped build the foundation for a successful and high-performing BCM team in the Australian Taxation Office. Practical, actionable advice will be provided, recognising that the task for those starting out can be quite daunting and complex.

  5. Living the mission: medical assistance to Nigeria.

    PubMed

    Patterson, Jan

    2007-11-01

    In 2001, a team of health care providers from Tennessee undertook a medical mission to the Nigerian Christian Hospital in Aba, Nigeria. During A 10-day period, the surgical team applied US and AORN standards when possible, but found they also had to accept some of the local standards because of the lack of medical supplies, cleaning supplies, and properly functioning equipment in this impoverished area. The 60 surgeries performed by the team was a small number relative to the community's overwhelming needs, but the team members were rewarded with the knowledge that they had helped many patients by providing them with quality care that normally would have been unavailable.

  6. Applying Strategic Visualization(Registered Trademark) to Lunar and Planetary Mission Design

    NASA Technical Reports Server (NTRS)

    Frassanito, John R.; Cooke, D. R.

    2002-01-01

    NASA teams, such as the NASA Exploration Team (NEXT), utilize advanced computational visualization processes to develop mission designs and architectures for lunar and planetary missions. One such process, Strategic Visualization (trademark), is a tool used extensively to help mission designers visualize various design alternatives and present them to other participants of their team. The participants, which may include NASA, industry, and the academic community, are distributed within a virtual network. Consequently, computer animation and other digital techniques provide an efficient means to communicate top-level technical information among team members. Today,Strategic Visualization(trademark) is used extensively both in the mission design process within the technical community, and to communicate the value of space exploration to the general public. Movies and digital images have been generated and shown on nationally broadcast television and the Internet, as well as in magazines and digital media. In our presentation will show excerpts of a computer-generated animation depicting the reference Earth/Moon L1 Libration Point Gateway architecture. The Gateway serves as a staging corridor for human expeditions to the lunar poles and other surface locations. Also shown are crew transfer systems and current reference lunar excursion vehicles as well as the Human and robotic construction of an inflatable telescope array for deployment to the Sun/Earth Libration Point.

  7. Kepler Mission: Current Status

    NASA Astrophysics Data System (ADS)

    Borucki, William J.; Koch, D. G.; Lissauer, J. J.; Bryson, S.; Natalie, B.; Caldwell, D. A.; DeVore, E.; Jenkins, J. M.; Christensen-Dalsgaard, J.; Cochran, W. D.; Dunham, E. W.; Gautier, T. N.; Geary, J. C.; Latham, D. W.; Sasselov, D.; Gilliland, R. L.; Gould, A.; Howell, S. B.; Monet, D. G.

    2007-12-01

    Kepler is a Discovery-class mission designed to determine the frequency of Earth-size planets in and near the habitable zone of solar-like stars. The instrument consists of a high precision photometer with Schmidt-type optics and a focal plane containing 95 million pixels to monitor over 100,000 stars to search for patterns of transits generated by planets as small as Mars. The recent reduction in the mission duration is discussed with regard to the impact on the expected science product and null statistics. Both terrestrial and giant planets discoveries will be followed up with ground-based Doppler-velocity observations to determine mass and density. The first meeting of Kepler Asteroseismic Science Consortium was held in Paris to organize an international team to analyze the Kepler data to determine the characteristics of the brighter target stars including their size and age. Stellar size determinations accurate to a few percent are expected. These will allow very accurate planet sizes to be determined from the depth of the transit signals. NASA HQ received thirty six proposals for the Participating Scientist Program and chose several new members to join the Science Team. Both the 0.95 m Schmidt corrector and 1.4 m aperture primary mirror have been completed and delivered for integration into the photometer. The focal plane with forty-two science CCD detectors and their processing electronics has been assembled and tested. The spacecraft assembly has begun with the mounting of the reaction control system, reaction wheels, attitude determination & control system, and power systems. Both the photometer and spacecraft are nearing final assembly with all subsystems having passed their environmental and performance testing. The photometer to spacecraft integration will begin this spring. The Mission is on schedule for a launch in February 2009. The Kepler Mission is funded by the NASA Astrophysics Division, Science Mission Directorate.

  8. Advice for running a successful research team.

    PubMed

    Stanley, David; Anderson, Judith

    2015-11-01

    To explore what is meant by a 'research team' and offer practical suggestions for supporting an effective and productive, collaborative research team. Collaborative research has become one of the main objectives of most higher education institutions and running effective research teams is central to achieving this aim. However, there is limited guidance in the literature about how to run or steer a research team. Search engines/databases used: CINAHL, Nursing and Allied Health Source, Primo search, Google search and Health Collection to access research articles and publications to support this topic. Literature search was extended to the end of 2014. Publications were reviewed for relevance to the topic via standard literature search. Research teams vary in size and composition, however they all require effective collaboration if they are to establish successful and flexible working relationships and produce useful and trustworthy research outputs. This article offers guidance for establishing and managing successful collaborative research relationships, building trust and a positive research team culture, clarifying team member roles, setting the teams' research agenda and managing the teams' functions so that team members feel able to contribute fully to the research goals and build a culture of support and apply 'emotional intelligence' throughout the process of building and running a successful research team. Collaboration is a central component of establishing successful research teams and enabling productive research outputs. This article offers guidance for research teams to help them to function more effectively and allow all members to contribute fully to each team's goals. Research teams that have established trust and a positive team culture will result in more efficient working relationships and potentially greater productivity. The advice offered reinforces the value of having research teams with diverse members from different disciplines

  9. Mission Medical Information System

    NASA Technical Reports Server (NTRS)

    Johnson-Throop, Kathy A.; Joe, John C.; Follansbee, Nicole M.

    2008-01-01

    This viewgraph presentation gives an overview of the Mission Medical Information System (MMIS). The topics include: 1) What is MMIS?; 2) MMIS Goals; 3) Terrestrial Health Information Technology Vision; 4) NASA Health Information Technology Needs; 5) Mission Medical Information System Components; 6) Electronic Medical Record; 7) Longitudinal Study of Astronaut Health (LSAH); 8) Methods; and 9) Data Submission Agreement (example).

  10. From Prime to Extended Mission: Evolution of the MER Tactical Uplink Process

    NASA Technical Reports Server (NTRS)

    Mishkin, Andrew H.; Laubach, Sharon

    2006-01-01

    To support a 90-day surface mission for two robotic rovers, the Mars Exploration Rover mission designed and implemented an intensive tactical operations process, enabling daily commanding of each rover. Using a combination of new processes, custom software tools, a Mars-time staffing schedule, and seven-day-a-week operations, the MER team was able to compress the traditional weeks-long command-turnaround for a deep space robotic mission to about 18 hours. However, the pace of this process was never intended to be continued indefinitely. Even before the end of the three-month prime mission, MER operations began evolving towards greater sustainability. A combination of continued software tool development, increasing team experience, and availability of reusable sequences first reduced the mean process duration to approximately 11 hours. The number of workshifts required to perform the process dropped, and the team returned to a modified 'Earth-time' schedule. Additional process and tool adaptation eventually provided the option of planning multiple Martian days of activity within a single workshift, making 5-day-a-week operations possible. The vast majority of the science team returned to their home institutions, continuing to participate fully in the tactical operations process remotely. MER has continued to operate for over two Earth-years as many of its key personnel have moved on to other projects, the operations team and budget have shrunk, and the rovers have begun to exhibit symptoms of aging.

  11. The health educator as a team leader in primary health care.

    PubMed

    Brieger, W R; Ramakrishna, J

    1986-01-01

    Health teams naturally vary in size and composition according to their goals and objectives. Leadership of these teams should also be based on these goals. The goals of community-based primary health care, local involvement, cultural relevance, effective use of local resources, imply an important leadership role for health educators. The experience in the Ibarapa Local Government Area in Nigeria shows that health educators can be effective leaders in guiding a primary health care work group through various stages of program development. The use of a flexible, contractual model of team formation fits in well with the health educator's abilities to coordinate various program inputs and serve as mediator between professionals and the communities they serve. The ultimate mark of the health educator's leadership skills is the incorporation of community members into the health team.

  12. The Stellar Imager (SI) Mission Concept

    NASA Technical Reports Server (NTRS)

    Carpenter, Kenneth G.; Schrijver, Carolus J.; Lyon, Richard G.; Mundy, Lee G.; Allen, Ronald J.; Armstrong, Thomas; Danchi, William C.; Karovska, Margarita; Marzouk, Joe; Mazzuca, Lisa M.; hide

    2002-01-01

    The Stellar Imager (SI) is envisioned as a space-based, UV-optical interferometer composed of 10 or more one-meter class elements distributed with a maximum baseline of 0.5 km. It is designed to image stars and binaries with sufficient resolution to enable long-term studies of stellar magnetic activity patterns, for comparison with those on the sun. It will also support asteroseismology (acoustic imaging) to probe stellar internal structure, differential rotation, and large-scale circulations. SI will enable us to understand the various effects of the magnetic fields of stars, the dynamos that generate these fields, and the internal structure and dynamics of the stars. The ultimate goal of the mission is to achieve the best-possible forecasting of solar activity as a driver of climate and space weather on time scales ranging from months up to decades, and an understanding of the impact of stellar magnetic activity on life in the Universe. In this paper we describe the scientific goals of the mission, the performance requirements needed to address these goals, the "enabling technology" development efforts being pursued, and the design concepts now under study for the full mission and a possible pathfinder mission.

  13. Mission operations and command assurance: Instilling quality into flight operations

    NASA Technical Reports Server (NTRS)

    Welz, Linda L.; Witkowski, Mona M.; Bruno, Kristin J.; Potts, Sherrill S.

    1993-01-01

    Mission Operations and Command Assurance (MO&CA) is a Total Quality Management (TQM) task on JPL projects to instill quality in flight mission operations. From a system engineering view, MO&CA facilitates communication and problem-solving among flight teams and provides continuous process improvement to reduce the probability of radiating incorrect commands to a spacecraft. The MO&CA task has evolved from participating as a member of the spacecraft team to an independent team reporting directly to flight project management and providing system level assurance. JPL flight projects have benefited significantly from MO&CA's effort to contain risk and prevent rather than rework errors. MO&CA's ability to provide direct transfer of knowledge allows new projects to benefit from previous and ongoing flight experience.

  14. Strategies for effective collaborative manuscript development in interdisciplinary science teams

    USGS Publications Warehouse

    Oliver, Samantha K.; Fergus, C. Emi; Skaff, Nicholas K.; Wagner, Tyler; Tan, Pang-Ning; Cheruvelil, Kendra Spence; Soranno, Patricia A.

    2018-01-01

    Science is increasingly being conducted in large, interdisciplinary teams. As team size increases, challenges can arise during manuscript development, where achieving one team goal (e.g., inclusivity) may be in direct conflict with other goals (e.g., efficiency). Here, we present strategies for effective collaborative manuscript development that draw from our experiences in an interdisciplinary science team writing collaborative manuscripts for six years. These strategies are rooted in six guiding principles that were important to our team: to create a transparent, inclusive, and accountable research team that promotes and protects team members who have less power to influence decision‐making while fostering creativity and productivity. To help alleviate the conflicts that can arise in collaborative manuscript development, we present the following strategies: understand your team composition, create an authorship policy and discuss authorship early and often, openly announce manuscript ideas, identify and communicate the type of manuscript and lead author management style, and document and describe authorship contributions. These strategies can help reduce the probability of group conflict, uphold individual and team values, achieve fair authorship practices, and increase science productivity.

  15. Spacecraft COst REduction Team (SCORE): TQM/CI on a massive scale

    NASA Technical Reports Server (NTRS)

    Bullard, Jerry D.

    1992-01-01

    The business of building satellites and space systems has matured. Few missions require, or can afford, excellent performance at any price. The new paradigm is doing more with less, providing quality systems at lower cost--in other words, doing our job 'Faster-Better-Cheaper.' The TRW Spacecraft COst REduction (SCORE) initiative was launched in 1990 by Daniel S. Goldin, then general manager of TRW's Space & Technology Group. The SCORE mission is to apply continuous improvement (CI) techniques to effect major reductions in the cost (our primary goal) and span time (as a corollary) required for the production of spacecraft. SCORE is a multi-year initiative that is having a profound effect on both the procedural and the cultural aspects of how we do business. The objectives of this initiative are being realized. The focus of this paper is not on the results of SCORE per se, but rather on the things we have leaned about how to do continuous improvement on a massive scale, with multilevel (hierarchical) CI teams. The following sections summarize the chronology of the SCORE initiative, from team formation to development of the year-end report for 1991. Lessons learned, the core of this presentation, are discussed--with particular focus on the unique aspects of SCORE. The SCORE initiative is continuing and, as a part of our evolving culture, will never end. It has resulted in profound insights into the way we do work and (the topic at hand) how to do CI for large and complex multidisciplinary development activities.

  16. 12 CFR 1282.13 - Central Cities, Rural Areas, and Other Underserved Areas Housing Goal.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Central Cities, Rural Areas, and Other... HOUSING GOALS AND MISSION ENTERPRISE HOUSING GOALS AND MISSION Housing Goals § 1282.13 Central Cities... purchase by each Enterprise of mortgages on housing located in central cities, rural areas, and other...

  17. Implementation Options for the PROPEL Electrodynamic Tether Demonstration Mission

    NASA Technical Reports Server (NTRS)

    Bilen, Sven G.; Johnson, C. Les; Gilchrist, Brian E.; Hoyt, Robert P.; Elder, Craig H.; Fuhrhop, Keith P.; Scadera, Michael; Stone, Nobie

    2014-01-01

    The PROPEL ("Propulsion using Electrodynamics") flight demonstration mission concept will demonstrate the use of an electrodynamic tether (EDT) for generating thrust, which will allow the propulsion system to overcome the limitations of the rocket equation. The mission concept has been developed by a team of government, industry, and academia partners led by NASA Marshall Space Flight Center (MSFC). PROPEL is being designed for versatility of the EDT system with multiple end users in mind and to be flexible with respect to platform. Previously, we reported on a comprehensive mission design for PROPEL with a mission duration of six months or longer with multiple mission goals including demonstration of significant boost, deboost, inclination change, and drag make-up activities. To explore a range of possible configurations, primarily driven by cost considerations, other mission concept designs have been pursued. In partnership with the NASA's Office of Chief Technologist (OCT) Game Changing Program, NASA MSFC Leadership, and the MSFC Advanced Concepts Office, a mission concept design was developed for a near-term EDT propulsion flight validation mission. The Electrodynamic Tether Propulsion Study (ETPS) defined an EDT propulsion system capable of very large delta-V for use on future missions developed by NASA, DoD, and commercial customers. To demonstrate the feasibility of an ETPS, the study focused on a space demonstration mission concept design with configuration of a pair of tethered satellite busses, one of which is the Japanese H-II Transfer Vehicle (HTV). The HTV would fly its standard ISS resupply mission. When resupply mission is complete, the ISS reconfigures and releases the HTV to perform the EDT experiment at safe orbital altitudes below the ISS. Though the focus of this particular mission concept design addresses a scenario involving the HTV or a similar vehicle, the propulsion system's capability is relevant to a number of applications, as noted above

  18. Achieving Supportability on Exploration Missions with In-Space Servicing

    NASA Technical Reports Server (NTRS)

    Bacon, Charles; Pellegrino, Joseph F.; McGuire, Jill; Henry, Ross; DeWeese, Keith; Reed, Benjamin; Aranyos, Thomas

    2015-01-01

    One of the long-term exploration goals of NASA is manned missions to Mars and other deep space robotic exploration. These missions would include sending astronauts along with scientific equipment to the surface of Mars for extended stay and returning the crew, science data and surface sample to Earth. In order to achieve this goal, multiple precursor missions are required that would launch the crew, crew habitats, return vehicles and destination systems into space. Some of these payloads would then rendezvous in space for the trip to Mars, while others would be sent directly to the Martian surface. To support such an ambitious mission architecture, NASA must reduce cost, simplify logistics, reuse and/or repurpose flight hardware, and minimize resources needed for refurbishment. In-space servicing is a means to achieving these goals. By designing a mission architecture that utilizes the concept of in-space servicing (robotic and manned), maximum supportability can be achieved.

  19. Navigating the MESSENGER Spacecraft through End of Mission

    NASA Astrophysics Data System (ADS)

    Bryan, C. G.; Williams, B. G.; Williams, K. E.; Taylor, A. H.; Carranza, E.; Page, B. R.; Stanbridge, D. R.; Mazarico, E.; Neumann, G. A.; O'Shaughnessy, D. J.; McAdams, J. V.; Calloway, A. B.

    2015-12-01

    The MErcury Surface, Space ENvironment, GEochemistry, and Ranging (MESSENGER) spacecraft orbited the planet Mercury from March 2011 until the end of April 2015, when it impacted the planetary surface after propellant reserves used to maintain the orbit were depleted. This highly successful mission was led by the principal investigator, Sean C. Solomon, of Columbia University. The Johns Hopkins University Applied Physics Laboratory (JHU/APL) designed and assembled the spacecraft and served as the home for spacecraft operations. Spacecraft navigation for the entirety of the mission was provided by the Space Navigation and Flight Dynamics Practice (SNAFD) of KinetX Aerospace. Orbit determination (OD) solutions were generated through processing of radiometric tracking data provided by NASA's Deep Space Network (DSN) using the MIRAGE suite of orbital analysis tools. The MESSENGER orbit was highly eccentric, with periapsis at a high northern latitude and periapsis altitude in the range 200-500 km for most of the orbital mission phase. In a low-altitude "hover campaign" during the final two months of the mission, periapsis altitudes were maintained within a narrow range between about 35 km and 5 km. Navigating a spacecraft so near a planetary surface presented special challenges. Tasks required to meet those challenges included the modeling and estimation of Mercury's gravity field and of solar and planetary radiation pressure, and the design of frequent orbit-correction maneuvers. Superior solar conjunction also presented observational modeling issues. One key to the overall success of the low-altitude hover campaign was a strategy to utilize data from an onboard laser altimeter as a cross-check on the navigation team's reconstructed and predicted estimates of periapsis altitude. Data obtained from the Mercury Laser Altimeter (MLA) on a daily basis provided near-real-time feedback that proved invaluable in evaluating alternative orbit estimation strategies, and

  20. Phootprint - A Phobos sample return mission study

    NASA Astrophysics Data System (ADS)

    Koschny, Detlef; Svedhem, Håkan; Rebuffat, Denis

    Introduction ESA is currently studying a mission to return a sample from Phobos, called Phootprint. This study is performed as part of ESA’s Mars Robotic Exploration Programme. Part of the mission goal is to prepare technology needed for a sample return mission from Mars itself; the mission should also have a strong scientific justification, which is described here. 1. Science goal The main science goal of this mission will be to Understand the formation of the Martian moons Phobos and put constraints on the evolution of the solar system. Currently, there are several possibilities for explaining the formation of the Martian moons: (a) co-formation with Mars (b) capture of objects coming close to Mars (c) Impact of a large body onto Mars and formation from the impact ejecta The main science goal of this mission is to find out which of the three scenarios is the most probable one. To do this, samples from Phobos would be returned to Earth and analyzed with extremely high precision in ground-based laboratories. An on-board payload is foreseen to provide information to put the sample into the necessary geological context. 2. Mission Spacecraft and payload will be based on experience gained from previous studies to Martian moons and asteroids. In particular the Marco Polo and MarcoPolo-R asteroid sample return mission studies performed at ESA were used as a starting point. Currently, industrial studies are ongoing. The initial starting assumption was to use a Soyuz launcher. Uunlike the initial Marco Polo and MarcoPolo-R studies to an asteroid, a transfer stage will be needed. Another main difference to an asteroid mission is the fact that the spacecraft actually orbits Mars, not Phobos or Deimos. It is possible to select a spacecraft orbit, which in a Phobos- or Deimos-centred reference system would give an ellipse around the moon. The following model payload is currently foreseen: - Wide Angle Camera, - Narrow Angle Camera, - Close-Up Camera, - Context camera for

  1. IceBridge team members

    NASA Image and Video Library

    2013-11-13

    These IceBridge team members aboard a huge U.S. Air Force C-17 transport aircraft are ready to step out into the cold Antarctic air. The C-17 aircraft that fly to Antarctica are operated by the U.S. Air Force's 62nd and 446th Airlift Wings based at Joint Base Lewis-McChord near Seattle, Wash. Credit: NASA/Goddard/Michael Studinger NASA's Operation IceBridge is an airborne science mission to study Earth's polar ice. For more information about IceBridge, visit: www.nasa.gov/icebridge NASA image use policy. NASA Goddard Space Flight Center enables NASA’s mission through four scientific endeavors: Earth Science, Heliophysics, Solar System Exploration, and Astrophysics. Goddard plays a leading role in NASA’s accomplishments by contributing compelling scientific knowledge to advance the Agency’s mission. Follow us on Twitter Like us on Facebook Find us on Instagram

  2. Training Concept for Long Duration Space Mission

    NASA Technical Reports Server (NTRS)

    O'Keefe, William

    2008-01-01

    There has been papers about maintenance and psychological training for Long Duration Space Mission (LDSM). There are papers on the technology needed for LDSMs. Few are looking at how groundbased pre-mission training and on-board in-transit training must be melded into one training concept that leverages this technology. Even more importantly, fewer are looking at how we can certify crews pre-mission. This certification must ensure, before the crew launches, that they can handle any problem using on-board assets without a large ground support team.

  3. Determining medical staffing requirements for humanitarian assistance missions.

    PubMed

    Negus, Tracy L; Brown, Carrie J; Konoske, Paula

    2010-01-01

    The primary mission of hospital ships is to provide acute medical and surgical services to U.S. forces during military operations. Hospital ships also provide a hospital asset in support of disaster relief and humanitarian assistance (HA) operations. HA missions afford medical care to populations with vastly different sets of medical conditions from combat casualty care, which affects staffing requirements. Information from a variety of sources was reviewed to better understand hospital ship HA missions. Factors such as time on-site and location shape the mission and underlying goals. Patient encounter data from previous HA missions were used to determine expected patient conditions encountered in various HA operations. These data points were used to project the medical staffing required for future missions. Further data collection, along with goal setting, must be performed to accomplish successful future HA missions. Refining staffing requirements allows deployments to accomplish needed HA and effectively reach underserved areas.

  4. Flora: A Proposed Hyperspectral Mission

    NASA Technical Reports Server (NTRS)

    Ungar, Stephen; Asner, Gregory; Green, Robert; Knox, Robert

    2006-01-01

    In early 2004, one of the authors (Stephen Ungar, NASA GSFC) presented a mission concept called "Spectrasat" at the AVIRIS Workshop in Pasadena, CA. This mission concept grew out of the lessons learned from the Earth Observing-One (EO-1) Hyperion Imaging Spectrometer and was structured to more effectively accomplish the types of studies conducted with Hyperion. The Spectrasat concept represented an evolution of the technologies and operation strategies employed on EO-I. The Spectrasat concept had been preceded by two community-based missions proposed by Susan Ustin, UC Davis and Robert Green, NASA JPL. As a result of community participation, starting at this AVIRIS Workshop, the Spectrasat proposal evolved into the Flora concept which now represents the combined visions of Gregory Asner (Carnegie Institute), Stephen Ungar, Robert Green and Robert Knox, NASA GSFC. Flora is a proposed imaging spectrometer mission, designed to address global carbon cycle science issues. This mission centers on measuring ecological disturbance for purposes of ascertaining changes in global carbon stocks and draws heavily on experience gained through AVIRIS airborne flights and Hyperion space born flights. The observing strategy exploits the improved ability of imaging spectrometers, as compared with multi-spectral observing systems, to identify vegetation functional groups, detect ecosystem response to disturbance and assess the related discovery. Flora will be placed in a sun synchronous orbit, with a 45 meter pixel size, a 90 km swath width and a 31 day repeat cycle. It covers the spectral range from 0.4 to 2.5 micrometers with a spectral sampling interval of 10 nm. These specifications meet the needs of the Flora science team under the leadership of Gregory Asner. Robert Green, has introduced a spectrometer design for Flora which is expected to have a SNR of 600: 1 in the VNIR and 450: 1 in the SWIR. The mission team at NASA GSFC is designing an Intelligent Payload Module (IPM

  5. MetNet Precursor - Network Mission to Mars

    NASA Astrophysics Data System (ADS)

    Harri, Arri-Matti

    2010-05-01

    We are developing a new kind of planetary exploration mission for Mars - MetNet in situ observation network based on a new semi-hard landing vehicle called the Met-Net Lander (MNL). The first MetNet vehicle, MetNet Precursor, slated for launch in 2011. The MetNet development work started already in 2001. The actual practical Precursor Mission development work started in January 2009 with participation from various space research institutes and agencies. The scientific rationale and goals as well as key mission solutions will be discussed. The eventual scope of the MetNet Mission is to deploy some 20 MNLs on the Martian surface using inflatable descent system structures, which will be supported by observations from the orbit around Mars. Currently we are working on the MetNet Mars Precursor Mission (MMPM) to deploy one MetNet Lander to Mars in the 2011 launch window as a technology and science demonstration mission. The MNL will have a versatile science payload focused on the atmospheric science of Mars. Time-resolved in situ Martian meteorological measurements acquired by the Viking, Mars Pathfinder and Phoenix landers and remote sensing observations by the Mariner 9, Viking, Mars Global Surveyor, Mars Odyssey and the Mars Express orbiters have provided the basis for our current understanding of the behavior of weather and climate on Mars. However, the available amount of data is still scarce and a wealth of additional in situ observations are needed on varying types of Martian orography, terrain and altitude spanning all latitudes and longitudes to address microscale and mesoscale atmospheric phenomena. Detailed characterization of the Martian atmospheric circulation patterns and climatological cycles requires simultaneous in situ atmospheric observations. The scientific payload of the MetNet Mission encompasses separate instrument packages for the atmospheric entry and descent phase and for the surface operation phase. The MetNet mission concept and key probe

  6. CubeSat evolution: Analyzing CubeSat capabilities for conducting science missions

    NASA Astrophysics Data System (ADS)

    Poghosyan, Armen; Golkar, Alessandro

    2017-01-01

    Traditionally, the space industry produced large and sophisticated spacecraft handcrafted by large teams of engineers and budgets within the reach of only a few large government-backed institutions. However, over the last decade, the space industry experienced an increased interest towards smaller missions and recent advances in commercial-off-the-shelf (COTS) technology miniaturization spurred the development of small spacecraft missions based on the CubeSat standard. CubeSats were initially envisioned primarily as educational tools or low cost technology demonstration platforms that could be developed and launched within one or two years. Recently, however, more advanced CubeSat missions have been developed and proposed, indicating that CubeSats clearly started to transition from being solely educational and technology demonstration platforms to offer opportunities for low-cost real science missions with potential high value in terms of science return and commercial revenue. Despite the significant progress made in CubeSat research and development over the last decade, some fundamental questions still habitually arise about the CubeSat capabilities, limitations, and ultimately about their scientific and commercial value. The main objective of this review is to evaluate the state of the art CubeSat capabilities with a special focus on advanced scientific missions and a goal of assessing the potential of CubeSat platforms as capable spacecraft. A total of over 1200 launched and proposed missions have been analyzed from various sources including peer-reviewed journal publications, conference proceedings, mission webpages as well as other publicly available satellite databases and about 130 relatively high performance missions were downselected and categorized into six groups based on the primary mission objectives including "Earth Science and Spaceborne Applications", "Deep Space Exploration", "Heliophysics: Space Weather", "Astrophysics", "Spaceborne In Situ

  7. Scientific goals of Nano-JASMINE

    NASA Astrophysics Data System (ADS)

    Yamada, Yoshiyuki; Fujita, Sho; Gouda, Naoteru; Kobayashi, Yukiyasu; Hara, Takuji; Nishi, Ryoichi; Yoshioka, Satoshi; Hozumi, Shunsuke

    2013-02-01

    Nano-JASMINE is an ultrasmall Japanese satellite (with a weight of 35 kg), designed to carry out an astrometric mission. The target accuracy is 3 milliarcseconds (mas) for stars brighter than magnitude 7.5 at zw-band wavelengths of 0.6-1.0 μm. The observational strategy is the same as that of Gaia and Hipparcos. The time span of 20 years since the Hipparcos mission will enable us to update the proper motion data obtained at that time. With the help of these updated measurements, we expect that some stars will be resolved into multiple stars. In addition, taking advantage of the small primary mirror (with a diameter of 5 cm), we can measure bright stars which cannot be observed with Gaia because of saturation limits. The core data reduction for the Nano-JASMINE mission will use Gaia's Astrometric Global Iterative Solution (agis). A collaboration between the Gaia agis and Nano-JASMINE teams was initiated in 2007.

  8. Goals, Objectives, and Requirements (GOR) of the Ground-based Nuclear Detonation Detection (GNDD) Team for the Office of Defense Nuclear Nonproliferation Research and Development (DNN R&D)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Casey, Leslie A.

    The goal, objectives, and requirements (GOR) presented in this document define a framework for describing research directed specifically by the Ground-based Nuclear Detonation Detection (GNDD) Team of the National Nuclear Security Administration (NNSA). The intent of this document is to provide a communication tool for the GNDD Team with NNSA management and with its stakeholder community. It describes the GNDD expectation that much of the improvement in the proficiency of nuclear explosion monitoring will come from better understanding of the science behind the generation, propagation, recording, and interpretation of seismic, infrasound, hydroacoustic, and radionuclide signals and development of "game-changer" advancesmore » in science and technology.« less

  9. STS-132/ULF-4 Flight Control Team in FCR-1

    NASA Image and Video Library

    2010-05-20

    JSC2010-E-085365 (20 May 2010) --- The members of the STS-132/ULF-4 ISS Orbit 2 flight control team pose for a group portrait in the space station flight control room in the Mission Control Center at NASA's Johnson Space Center. Flight director Emily Nelson holds the Expedition 23 mission logo.

  10. STS-132/ULF-4 Flight Control Team in FCR-1

    NASA Image and Video Library

    2010-05-19

    JSC2010-E-086277 (19 May 2010) --- The members of the STS-132/ULF-4 ISS Orbit 1 flight control team pose for a group portrait in the space station flight control room in the Mission Control Center at NASA's Johnson Space Center. Flight director Holly Ridings holds the STS-132 mission logo.

  11. STS-132/ULF-4 Flight Control Team in FCR-1

    NASA Image and Video Library

    2010-05-20

    JSC2010-E-086504 (20 May 2010) --- The members of the STS-132/ULF-4 ISS Orbit 3 flight control team pose for a group portrait in the space station flight control room in the Mission Control Center at NASA's Johnson Space Center. Flight director Scott Stover holds the Expedition 23 mission logo.

  12. Artist's concept of ASTP mission profile

    NASA Image and Video Library

    1974-10-01

    S74-14949 (October 1974) --- Artist?s drawings and call-outs depict phases of the joint U.S.-USSR Apollo-Soyuz Test Project, an Earth-orbital mission which will feature rendezvous and docking of the respective spacecraft of the two nations. ASTP crewmen for the USSR include Aleksey A. Leonov and Valeriy N. Kubasov. The astronaut team includes astronauts Thomas P. Stafford, Vance D. Brand and Donald K. Slayton. The mission is scheduled to take place in summer 1975.

  13. Football goal distributions and extremal statistics

    NASA Astrophysics Data System (ADS)

    Greenhough, J.; Birch, P. C.; Chapman, S. C.; Rowlands, G.

    2002-12-01

    We analyse the distributions of the number of goals scored by home teams, away teams, and the total scored in the match, in domestic football games from 169 countries between 1999 and 2001. The probability density functions (PDFs) of goals scored are too heavy-tailed to be fitted over their entire ranges by Poisson or negative binomial distributions which would be expected for uncorrelated processes. Log-normal distributions cannot include zero scores and here we find that the PDFs are consistent with those arising from extremal statistics. In addition, we show that it is sufficient to model English top division and FA Cup matches in the seasons of 1970/71-2000/01 on Poisson or negative binomial distributions, as reported in analyses of earlier seasons, and that these are not consistent with extremal statistics.

  14. ISS 7A.1 Flight Control Team Photo in BFCR

    NASA Image and Video Library

    2001-08-17

    JSC2001-02225 (17 August 2001) --- The members of the STS-105/ISS 7A.1 Orbit 2 team pose for a group portrait in the International Space Station (ISS) flight control room (BFCR) in Houston’s Mission Control Center (MCC). Orbit 2 flight director Rick LaBrode (front right) holds the STS-105 mission logo, and Astronaut Joan E. Higginbotham, ISS spacecraft communicator (CAPCOM), holds the ISS 7A.1 mission logo.

  15. 2015 Science Mission Directorate Technology Highlights

    NASA Technical Reports Server (NTRS)

    Seablom, Michael S.

    2016-01-01

    The role of the Science Mission Directorate (SMD) is to enable NASA to achieve its science goals in the context of the Nation's science agenda. SMD's strategic decisions regarding future missions and scientific pursuits are guided by Agency goals, input from the science community including the recommendations set forth in the National Research Council (NRC) decadal surveys and a commitment to preserve a balanced program across the major science disciplines. Toward this end, each of the four SMD science divisions -- Heliophysics, Earth Science, Planetary Science, and Astrophysics -- develops fundamental science questions upon which to base future research and mission programs. Often the breakthrough science required to answer these questions requires significant technological innovation, e.g., instruments or platforms with capabilities beyond the current state of the art. SMD's targeted technology investments fill technology gaps, enabling NASA to build the challenging and complex missions that accomplish groundbreaking science.

  16. Portraying the Contribution of Individual Behaviors to Team Cohesion and Performance

    NASA Technical Reports Server (NTRS)

    Parke, Bonny; Orasanu, Judith

    2012-01-01

    Behaviors of individuals in teams both contribute to and are molded by team dynamics. How they do so has been the subject of much research. A method of portraying individuals' behaviors in teams, the Team Diagramming Method (TDM) is presented. Behaviors are rated by other team members on three important dimensions: positivity/negativity, dominant/submissive, and task-orientedness/expressiveness. A study of 5-person teams engaging in a 3-day moon simulation task demonstrated that measures of these perceived behaviors as well as the variances of these behaviors correlated with cohesion measures and performance. The method shows strengths and weaknesses of particular teams and, by comparison with high-performing teams, suggests interventions based on individual as well as team behaviors. The primary goal of this study was to determine the extent to which these team level variables, derived from all team members' rated behaviors, were associated with previous methods of measuring cohesion and with performance. A secondary goal was to determine the stability of TDM measures over time by comparing team level variables based on ratings early and later in the team s work together.

  17. Apollo experience report: Communications system flight evaluation and verification

    NASA Technical Reports Server (NTRS)

    Travis, D.; Royston, C. L., Jr.

    1972-01-01

    Flight tests of the synergetic operation of the spacecraft and earth based communications equipment were accomplished during Apollo missions AS-202 through Apollo 12. The primary goals of these tests were to verify that the communications system would adequately support lunar landing missions and to establish the inflight communications system performance characteristics. To attain these goals, a communications system flight verification and evaluation team was established. The concept of the team operations, the evolution of the evaluation processes, synopses of the team activities associated with each mission, and major conclusions and recommendations resulting from the performance evaluation are represented.

  18. Team Spirit: Teachers Work Together to Establish and Achieve Key Goals

    ERIC Educational Resources Information Center

    Troen, Vivian; Boles, Katherine C.

    2010-01-01

    Common experience, along with a vast collection of research, demonstrates that schools can expect a range of benefits to accrue when teachers work together. Teacher teaming can reduce teacher isolation, increase collegiality, facilitate the sharing of resources and ideas, and capitalize on teacher's individual and shared strengths. And most…

  19. A mission operations architecture for the 21st century

    NASA Technical Reports Server (NTRS)

    Tai, W.; Sweetnam, D.

    1996-01-01

    An operations architecture is proposed for low cost missions beyond the year 2000. The architecture consists of three elements: a service based architecture; a demand access automata; and distributed science hubs. The service based architecture is based on a set of standard multimission services that are defined, packaged and formalized by the deep space network and the advanced multi-mission operations system. The demand access automata is a suite of technologies which reduces the need to be in contact with the spacecraft, and thus reduces operating costs. The beacon signaling, the virtual emergency room, and the high efficiency tracking automata technologies are described. The distributed science hubs provide information system capabilities to the small science oriented flight teams: individual access to all traditional mission functions and services; multimedia intra-team communications, and automated direct transparent communications between the scientists and the instrument.

  20. Cassini End of Mission Preview

    NASA Image and Video Library

    2017-09-13

    Cassini project scientist at JPL, Linda Spilker answers questions from members of the media during a press conference previewing Cassini's End of Mission, Wednesday, Sept. 13, 2017 at NASA's Jet Propulsion Laboratory in Pasadena, California. Since its arrival in 2004, the Cassini-Huygens mission has been a discovery machine, revolutionizing our knowledge of the Saturn system and captivating us with data and images never before obtained with such detail and clarity. On Sept. 15, 2017, operators will deliberately plunge the spacecraft into Saturn, as Cassini gathered science until the end. The “plunge” ensures Saturn’s moons will remain pristine for future exploration. During Cassini’s final days, mission team members from all around the world gathered at NASA’s Jet Propulsion Laboratory, Pasadena, California, to celebrate the achievements of this historic mission. Photo Credit: (NASA/Joel Kowsky)

  1. Cassini End of Mission Preview

    NASA Image and Video Library

    2017-09-13

    Cassini program manager at JPL, Earl Maize, center, answers questions from members of the media during a press conference previewing Cassini's End of Mission, Wednesday, Sept. 13, 2017 at NASA's Jet Propulsion Laboratory in Pasadena, California. Since its arrival in 2004, the Cassini-Huygens mission has been a discovery machine, revolutionizing our knowledge of the Saturn system and captivating us with data and images never before obtained with such detail and clarity. On Sept. 15, 2017, operators will deliberately plunge the spacecraft into Saturn, as Cassini gathered science until the end. The “plunge” ensures Saturn’s moons will remain pristine for future exploration. During Cassini’s final days, mission team members from all around the world gathered at NASA’s Jet Propulsion Laboratory, Pasadena, California, to celebrate the achievements of this historic mission. Photo Credit: (NASA/Joel Kowsky)

  2. Cassini End of Mission Preview

    NASA Image and Video Library

    2017-09-13

    A model of the Cassini-Huygens spacecraft is seen in the von Kármán Auditorium during a press conference previewing Cassini's End of Mission, Wednesday, Sept. 13, 2017 at NASA's Jet Propulsion Laboratory in Pasadena, California. Since its arrival in 2004, the Cassini-Huygens mission has been a discovery machine, revolutionizing our knowledge of the Saturn system and captivating us with data and images never before obtained with such detail and clarity. On Sept. 15, 2017, operators will deliberately plunge the spacecraft into Saturn, as Cassini gathered science until the end. The “plunge” ensures Saturn’s moons will remain pristine for future exploration. During Cassini’s final days, mission team members from all around the world gathered at NASA’s Jet Propulsion Laboratory, Pasadena, California, to celebrate the achievements of this historic mission. Photo Credit: (NASA/Joel Kowsky)

  3. Cassini End of Mission Preview

    NASA Image and Video Library

    2017-09-13

    Principle investigator for the Neutral Mass Spectrometer (INMS) at the Southwest Research Institute, Hunter Waites, peaks during a press conference previewing Cassini's End of Mission, Wednesday, Sept. 13, 2017 at NASA's Jet Propulsion Laboratory in Pasadena, California. Since its arrival in 2004, the Cassini-Huygens mission has been a discovery machine, revolutionizing our knowledge of the Saturn system and captivating us with data and images never before obtained with such detail and clarity. On Sept. 15, 2017, operators will deliberately plunge the spacecraft into Saturn, as Cassini gathered science until the end. The “plunge” ensures Saturn’s moons will remain pristine for future exploration. During Cassini’s final days, mission team members from all around the world gathered at NASA’s Jet Propulsion Laboratory, Pasadena, California, to celebrate the achievements of this historic mission. Photo Credit: (NASA/Joel Kowsky)

  4. Cassini End of Mission Preview

    NASA Image and Video Library

    2017-09-13

    Cassini project scientist at JPL, Linda Spilker, right, looks on as Cassini program manager at JPL, Earl Maize speaks during a press conference previewing Cassini's End of Mission, Wednesday, Sept. 13, 2017 at NASA's Jet Propulsion Laboratory in Pasadena, California. Since its arrival in 2004, the Cassini-Huygens mission has been a discovery machine, revolutionizing our knowledge of the Saturn system and captivating us with data and images never before obtained with such detail and clarity. On Sept. 15, 2017, operators will deliberately plunge the spacecraft into Saturn, as Cassini gathered science until the end. The “plunge” ensures Saturn’s moons will remain pristine for future exploration. During Cassini’s final days, mission team members from all around the world gathered at NASA’s Jet Propulsion Laboratory, Pasadena, California, to celebrate the achievements of this historic mission. Photo Credit: (NASA/Joel Kowsky)

  5. Europa Explorer - An Exceptional Mission Using Existing Technology

    NASA Technical Reports Server (NTRS)

    Clark, Karla B.

    2007-01-01

    A mission to Europa has been identified as a high priority by the science community for several years. The difficulty of an orbital mission, primarily due to the propulsive requirements and Jupiter's trapped radiation, led to many studies which investigated various approaches to meeting the science goals. The Europa Orbiter Mission studied in the late 1990's only met the most fundamental science objectives. The science objectives have evolved with the discoveries from the Galileo mission. JPL studied one concept, Europa Explorer, for a Europa orbiting mission which could meet a much expanded set of science objectives. A study science group was formed to verify that the science objectives and goals were being adequately met by the resulting mission design concept. The Europa Explorer design emerged primarily from two key self-imposed constraints: 1) meet the full set of identified nonlander science objectives and 2) use only existing technology.

  6. Battery and Fuel Cell Development Goals for the Lunar Surface and Lander

    NASA Technical Reports Server (NTRS)

    Mercer, Carolyn R.

    2008-01-01

    NASA is planning a return to the moon and requires advances in energy storage technology for its planned lunar lander and lunar outpost. This presentation describes NASA s overall mission goals and technical goals for batteries and fuel cells to support the mission. Goals are given for secondary batteries for the lander s ascent stage and suits for extravehicular activity on the lunar surface, and for fuel cells for the lander s descent stage and regenerative fuel cells for outpost power. An overall approach to meeting these goals is also presented.

  7. HUT Data Inspected at Marshall Space Flight Center During the STS-35 Mission

    NASA Technical Reports Server (NTRS)

    1990-01-01

    The primary objective of the STS-35 mission was round the clock observation of the celestial sphere in ultraviolet and X-Ray astronomy with the Astro-1 observatory which consisted of four telescopes: the Hopkins Ultraviolet Telescope (HUT); the Wisconsin Ultraviolet Photo-Polarimeter Experiment (WUPPE); the Ultraviolet Imaging Telescope (UIT); and the Broad Band X-Ray Telescope (BBXRT). The Huntsville Operations Support Center (HOSC) Spacelab Payload Operations Control Center (SL POCC) at the Marshall Space Flight Center (MSFC) was the air/ground communication channel used between the astronauts and ground control teams during the Spacelab missions. Teams of controllers and researchers directed on-orbit science operations, sent commands to the spacecraft, received data from experiments aboard the Space Shuttle, adjusted mission schedules to take advantage of unexpected science opportunities or unexpected results, and worked with crew members to resolve problems with their experiments. Due to loss of data used for pointing and operating the ultraviolet telescopes, MSFC ground teams were forced to aim the telescopes with fine tuning by the flight crew. This photo captures the activity of viewing HUT data in the Mission Manager Actions Room during the mission.

  8. Cassini-Huygens Maneuver Experience: Ending the Prime Mission

    NASA Technical Reports Server (NTRS)

    Goodson, Troy D.; Ballard, Christopher G.; Gist, Emily M.; Hahn, Yungsun; Stumpf, Paul W.; Wagner, Sean V.; Williams, Powtawche N.

    2008-01-01

    The Cassini-Huygens spacecraft was launched in 1997 on a mission to observe Saturn and its many moons. After a seven-year cruise, it entered a Saturnian orbit for a four-year, prime mission. This paper highlights significant maneuver activities performed during the last year of the prime mission. Specifically, results of 42 recent maneuvers are presented. Many maneuvers have been skipped, saving fuel and flight team effort. The system has performed more accurately than the pre-launch expectations and requirements. This is in large part why the Cassini-Huygens spacecraft has been navigated with tremendous success during the prime mission.

  9. Mission to the Solar System: Exploration and Discovery. A Mission and Technology Roadmap

    NASA Technical Reports Server (NTRS)

    Gulkis, S. (Editor); Stetson, D. S. (Editor); Stofan, E. R. (Editor)

    1998-01-01

    Solar System exploration addresses some of humanity's most fundamental questions: How and when did life form on Earth? Does life exist elsewhere in the Solar System or in the Universe? - How did the Solar System form and evolve in time? - What can the other planets teach us about the Earth? This document describes a Mission and Technology Roadmap for addressing these and other fundamental Solar System Questions. A Roadmap Development Team of scientists, engineers, educators, and technologists worked to define the next evolutionary steps in in situ exploration, sample return, and completion of the overall Solar System survey. Guidelines were to "develop aa visionary, but affordable, mission and technology development Roadmap for the exploration of the Solar System in the 2000 to 2012 timeframe." The Roadmap provides a catalog of potential flight missions. (Supporting research and technology, ground-based observations, and laboratory research, which are no less important than flight missions, are not included in this Roadmap.)

  10. Effective team management by district nurses.

    PubMed

    Bliss, Julie

    2004-12-01

    This article considers the key role played by the district nurse in managing the district nursing team in order to provide high quality health care. It considers how the district nurse can use key managerial roles (interpersonal, informational and decision-making) in order to ensure unity within the team. The importance of shared goals and trust to achieve unity is explored and a strategy for managing conflict is discussed. Finally, the article suggests a set of ground rules which could be used to facilitate effective team working.

  11. Power Goals for NASA's Exploration Program

    NASA Technical Reports Server (NTRS)

    Jeevarajan, Judith A.

    2009-01-01

    Exciting Future Programs ahead for NASA. Power is needed for all Exploration vehicles and for the missions. For long term missions as in Lunar and Mars programs, safe, high energy/ultra high energy batteries are required. Safety is top priority for human-rated missions. Two-fault tolerance to catastrophic failures is required for human-rated safety To meet power safety goals -inherent cell safety may be required; it can lessen complexity of external protective electronics and prevents dependency on hardware that may also have limitations. Inherent cell safety will eliminate the need to carry out screening of all cells (X-rays, vibration, etc.)

  12. Next Gen NEAR: Near Earth Asteroid Human Robotic Precursor Mission Concept

    NASA Technical Reports Server (NTRS)

    Rivkin, Andrew S.; Kirby, Karen; Cheng, Andrew F.; Gold, Robert; Kelly, Daniel; Reed, Cheryl; Abell, Paul; Garvin, James; Landis, Rob

    2012-01-01

    Asteroids have long held the attention of the planetary science community. In particular, asteroids that evolve into orbits near that of Earth, called near-Earth objects (NEO), are of high interest as potential targets for exploration due to the relative ease (in terms of delta V) to reach them. NASA's Flexible Path calls for missions and experiments to be conducted as intermediate steps towards the eventual goal of human exploration of Mars; piloted missions to NEOs are such example. A human NEO mission is a valuable exploratory step beyond the Earth-Moon system enhancing capabilities that surpass our current experience, while also developing infrastructure for future mars exploration capabilities. To prepare for a human rendezvous with an NEO, NASA is interested in pursuing a responsible program of robotic NEO precursor missions. Next Gen NEAR is such a mission, building on the NEAR Shoemaker mission experience at the JHU/APL Space Department, to provide an affordable, low risk solution with quick data return. Next Gen NEAR proposes to make measurements needed for human exploration to asteroids: to demonstrate proximity operations, to quantify hazards for human exploration and to characterize an environment at a near-Earth asteroid representative of those that may be future human destinations. The Johns Hopkins University Applied Physics Laboratory has demonstrated exploration-driven mission feasibility by developing a versatile spacecraft design concept using conventional technologies that satisfies a set of science, exploration and mission objectives defined by a concept development team in the summer of 2010. We will describe the mission concept and spacecraft architecture in detail. Configuration options were compared with the mission goals and objectives in order to select the spacecraft design concept that provides the lowest cost, lowest implementation risk, simplest operation and the most benefit for the mission implementation. The Next Gen NEAR

  13. Epidemiology and location of primary retrieval missions in a Scottish aeromedical service.

    PubMed

    Neagle, Gregg; Curatolo, Lisa; Ferris, John; Donald, Mike; Hearns, Stephen; Corfield, Alasdair R

    2017-07-25

    Prehospital critical care teams comprising an appropriately trained physician and paramedic or nurse have been associated with improved outcomes in selected trauma patients. These teams are a scarce and expensive resource, especially when delivered by rotary air assets. The optimal tasking of prehospital critical care teams is therefore vital and remains a subject of debate. Emergency Medical Retrieval Service (EMRS) provides a prehospital critical care response team to incidents over a large area of Scotland either by air or by road. A convenience sample of consecutive EMRS missions covering a period of 18 months from May 2013 to January 2015 was taken. These missions were matched with the ambulance service information on geographical location of the incident. In order to assess the appropriateness of tasking, interventions undertaken on each mission were analysed and divided into two subcategories: 'critical care interventions' and 'advanced medical interventions'. A tasking was deemed appropriate if it included either category of intervention or if a patient was pronounced life extinct at the scene. A total of 1279 primary missions were undertaken during the study period. Of these, 493 primary missions met the inclusion criteria and generated complete location data. The median distance to scene was calculated as 5.6 miles for land responses and 34.2 miles for air responses. Overall, critical care interventions were performed on 17% (84/493) of patients. A further 21% (102/493) of patients had an advanced medical intervention. Including those patients for whom life was pronounced extinct on scene by the EMRS team, a total of 42% (206/493) taskings were appropriate. Overall, our data show a wide geographical spread of tasking for our service, which is in keeping with other suburban/rural models of prehospital care. Tasking accuracy is also comparable to the accuracy shown by other similar services.

  14. Balancing Science Objectives and Operational Constraints: A Mission Planner's Challenge

    NASA Technical Reports Server (NTRS)

    Weldy, Michelle

    1996-01-01

    The Air Force minute sensor technology integration (MSTI-3) satellite's primary mission is to characterize Earth's atmospheric background clutter. MSTI-3 will use three cameras for data collection, a mid-wave infrared imager, a short wave infrared imager, and a visible imaging spectrometer. Mission science objectives call for the collection of over 2 million images within the one year mission life. In addition, operational constraints limit camera usage to four operations of twenty minutes per day, with no more than 10,000 data and calibrating images collected per day. To balance the operational constraints and science objectives, the mission planning team has designed a planning process to e event schedules and sensor operation timelines. Each set of constraints, including spacecraft performance capabilities, the camera filters, the geographical regions, and the spacecraft-Sun-Earth geometries of interest, and remote tracking station deconflictions has been accounted for in this methodology. To aid in this process, the mission planning team is building a series of tools from commercial off-the-shelf software. These include the mission manifest which builds a daily schedule of events, and the MSTI Scene Simulator which helps build geometrically correct scans. These tools provide an efficient, responsive, and highly flexible architecture that maximizes data collection while minimizing mission planning time.

  15. Life at Mission Creep U

    ERIC Educational Resources Information Center

    Dubrow, Greg; Moseley, Bryan; Dustin, Daniel

    2006-01-01

    The term "mission creep" was originally coined nearly a hundred years ago to describe the gradual process by which a military mission's stated methods and goals change, and recently the term has been applied to incremental organizational changes. In this article, the term is used to describe what happens when a teaching-oriented college or…

  16. Creative Analytics of Mission Ops Event Messages

    NASA Technical Reports Server (NTRS)

    Smith, Dan

    2017-01-01

    -telemetry mission operations information into a common log format and then providing display and analytics tools to provide in-depth assessment of the log contents. The work includes: Common interface formats for acquiring time-tagged text messages Conversion of common files for schedules, orbital events, and stored commands to the common log format Innovative displays to depict thousands of messages on a single display Structured English text queries against the log message data store, extensible to a more mature natural language query capability Goal of speech-to-text and text-to-speech additions to create a personal mission operations assistant to aid on-console operations. A wide variety of planned uses identified by the mission operations teams will be discussed.

  17. It Takes a Village. Collaborative Outer Planet Missions

    NASA Technical Reports Server (NTRS)

    Rymer, A. M.; Turtle, E. P.; Hofstadter, M. D.; Simon, A. A.; Hospodarsky, G. B.

    2017-01-01

    A mission to one or both of our local Ice Giants (Uranus and Neptune) emerged as a high priority in the most recent Planetary Science Decadal Survey and was also specifically mentioned supportively in the Heliophysics Decadal Survey. In 2016, NASA convened a science definition team to study ice giant mission concepts in more detail. Uranus and Neptune represent the last remaining planetary type in our Solar System to have a dedicated orbiting mission. The case for a Uranus mission has been made eloquently in the Decadal Surveys. Here we summarize some of the major drivers that lead to enthusiastic support for an Ice Giant mission in general, and use the example of a Uranus Mission concept to illustrate opportunities such a mission might provide for cross-division collaboration and cost-sharing.

  18. 76 FR 11203 - Water Technology Trade Mission to India

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-01

    ... for other uses. To address this issue, the government of India and the private sector have made... opportunities for U.S. companies that have expertise in these technologies. Mission Goals The goals of the Water Technology Trade Mission to India are to help U.S. water and waste water technology companies initiate and/or...

  19. Space Students Visit MSFC During STS-35 Astro-1 Mission

    NASA Technical Reports Server (NTRS)

    1990-01-01

    The primary objective of the STS-35 mission was round the clock observation of the celestial sphere in ultraviolet and X-Ray astronomy with the Astro-1 observatory which consisted of four telescopes: the Hopkins Ultraviolet Telescope (HUT); the Wisconsin Ultraviolet Photo-Polarimeter Experiment (WUPPE); the Ultraviolet Imaging Telescope (UIT); and the Broad Band X-Ray Telescope (BBXRT). The Huntsville Operations Support Center (HOSC) Spacelab Payload Operations Control Center (SL POCC) at the Marshall Space Flight Center (MSFC) was the air/ground communication channel used between the astronauts and ground control teams during the Spacelab missions. Teams of controllers and researchers directed on-orbit science operations, sent commands to the spacecraft, received data from experiments aboard the Space Shuttle, adjusted mission schedules to take advantage of unexpected science opportunities or unexpected results, and worked with crew members to resolve problems with their experiments. This photo is of Space classroom students in the Discovery Optics Lab at MSFC during STS-35, ASTRO-1 mission payload operations.

  20. Psychological and Behavioral Health Issues of Long-Duration Space Missions

    NASA Technical Reports Server (NTRS)

    Eksuzian, Daniel J.

    1998-01-01

    It will be the responsibility of the long-duration space flight crew to take the actions necessary to maintain their health and well-being and to cope with medical emergencies without direct assistance from support personnel, including maintaining mental health and managing physiological and psychological changes that may impair decision making and performance. The Behavior and Performance Integrated Product Team at Johnson Space Center, working, within the Space Medicine, Monitoring, and Countermeasures Program, has identified critical questions pertaining to long-duration space crew behavioral health, psychological adaptation, human factors and habitability, and sleep and circadian rhythms. Among the projects addressing these questions are: the development of tools to assess cognitive functions during space missions; the development of a model of psychological adaptation in isolated and confined environments; tools and methods for selecting individuals and teams well-suited for long-duration missions; identification of mission-critical tasks and performance evaluation; and measures of sleep quality and correlation to mission performance.

  1. General Mission Analysis Tool (GMAT)

    NASA Technical Reports Server (NTRS)

    Hughes, Steven P.

    2007-01-01

    The General Mission Analysis Tool (GMAT) is a space trajectory optimization and mission analysis system developed by NASA and private industry in the spirit of the NASA Mission. GMAT contains new technology and is a testbed for future technology development. The goal of the GMAT project is to develop new space trajectory optimization and mission design technology by working inclusively with ordinary people, universities, businesses, and other government organizations, and to share that technology in an open and unhindered way. GMAT is a free and open source software system licensed under the NASA Open Source Agreement: free for anyone to use in development of new mission concepts or to improve current missions, freely available in source code form for enhancement or further technology development.

  2. The Expose-R2 mission: astrobiology and astrochemistry in low Earth orbit

    NASA Astrophysics Data System (ADS)

    Demets, René

    EXPOSE is an exposure platform developed by ESA which permits scientists to install test samples for 1 to 2 years at the outer surface of the ISS. In that way, the impact of the open space environment on biological and biochemical sample materials can be explored. This environment, featuring full-spectrum solar light, near-vacuum, cosmic radiation, wide temperature variations and near-weightlessness, is impossible to reproduce in its entirety in the lab. As such, EXPOSE offers astrochemists and astrobiologists a chance to acquire novel scientific data. Astrochemists are interested in Low Earth Orbit conditions due to the fact that photochemistry in space is quite different from photochemistry on Earth, where the high-energy UV compounds of the solar spectrum are filtered away by our atmosphere. As for the astro biologists, EXPOSE offers an attractive opportunity to expand earlier results obtained during short-duration LEO flights, which have shown that particular microbes and, amazingly, even some multi-cellular macroscopic organisms were able to cope with a two-week exposure to space. The open space environment, often described as harsh and hostile, can apparently be tolerated by some robust inhabitants of our Earth - unprotected, in the absence of a space suit! The first mission of EXPOSE, as an external payload on the European Columbus module, happened during 2008-2009 with the test samples provided by five separate research teams. Three additional teams were involved in the monitoring of space environment. The results were published collectively in 2012 in a special issue of the monthly journal Astrobiology. Several organisms survived, having spent 1.5 years in space. The second mission was called EXPOSE-R, the R referring to ‘Russian segment’, the location where the EXPOSE instrument was installed this time. The EXPOSE-R mission took place in 2009-2011, ten science teams were involved. The publication of the results, again as a collection, is currently in

  3. Managing Risk for Cassini During Mission Operations and Data Analysis (MOandDA)

    NASA Technical Reports Server (NTRS)

    Witkowski, Mona M.

    2002-01-01

    A Risk Management Process has been tailored for Cassini that not only satisfies the requirements of NASA and JPL, but also allows the Program to proactively identify and assess risks that threaten mission objectives. Cassini Risk Management is a team effort that involves both management and engineering staff. The process is managed and facilitated by the Mission Assurance Manager (MAM), but requires regular interactions with Program Staff and team members to instill the risk management philosophy into the day to day mission operations. While Risk Management is well defined for projects in the development phase, it is a relatively new concept for Mission Operations. The Cassini team has embraced this process and has begun using it in an effective, proactive manner, to ensure mission success. It is hoped that the Cassini Risk Management Process will form the basis by which risk management is conducted during MO&DA on future projects. proactive in identifying, assessing and mitigating risks before they become problems. Cost ehtiveness is achieved by: Comprehensively identifying risks Rapidly assessing which risks require the expenditure of pruject cewums Taking early actions to mitigate these risks Iterating the process frequently, to be responsive to the dynamic internal and external environments The Cassini Program has successfully implemented a Risk Management Process for mission operations, The initial SRL has been developed and input into he online tool. The Risk Management webbased system has been rolled out for use by the flight team and risk owners we working proactive in identifying, assessing and mitigating risks before they become problems. Cost ehtiveness is achieved by: Comprehensively identifying risks Rapidly assessing which risks require the expenditure of pruject cewums Taking early actions to mitigate these risks Iterating the process frequently, to be responsive to the dynamic internal and external environments The Cassini Program has successfully

  4. STS-118 Ascent/Entry Flight Control Team in WFCR

    NASA Image and Video Library

    2007-09-17

    JSC2007-E-46429 (17 Sept. 2007) --- The members of the STS-118 Ascent/Entry flight control team and crewmembers pose for a group portrait in the space shuttle flight control room of Houston's Mission Control Center (MCC). Flight director Steve Stich holds the STS-118 mission logo. Astronauts Scott Kelly, commander, is at left foreground and astronaut Chris Ferguson, spacecraft communicator (CAPCOM), is at right foreground. Additional crewmembers pictured are Charlie Hobaugh, pilot; Barbara R. Morgan, Tracy Caldwell and Rick Mastracchio, all mission specialists.

  5. Kepler Mission: A Search for Habitable Planets

    NASA Technical Reports Server (NTRS)

    Koch, David; Fonda, Mark (Technical Monitor)

    2002-01-01

    The Kepler Mission was selected by NASA as one of the next two Discovery Missions. The mission design is based on the search for Earth-size planets in the habitable zone of solar-like stars, but does not preclude the discovery of larger or smaller planets in other orbits of non-solar-like stars. An overview of the mission, the scientific goals and the anticipated results will be presented.

  6. Making Sense of Conflict in Distributed Teams: A Design Science Approach

    ERIC Educational Resources Information Center

    Zhang, Guangxuan

    2016-01-01

    Conflict is a substantial, pervasive activity in team collaboration. It may arise because of differences in goals, differences in ways of working, or interpersonal dissonance. The specific focus for this research is the conflict in distributed teams. As opposed to traditional teams, participants of distributed teams are geographically dispersed…

  7. Building a leadership team that works.

    PubMed

    Blomenberg, Emily M

    2005-01-01

    Radiology administrators often are challenged to do more with less. In today's fast-paced work environment, leaders must be creative. They must surround themselves with good people in order to successfully achieve their organizations' goals. Once a radiology administrator is satisfied and comfortable that he or she has, the right staff involved, a leadership team can be formally establislished. Howard Regional Health System established an Imaging Services Leadership Team with a vision to provide leaders for the staff to "follow," just as team members learn from the radiology administrator. In addition, team members are vital in assisting the radiology administrator in managing the department The process of building the team consisted of 3 steps: selecting team members (the most challenging and time-consuming component), formalizing a functional team, and putting the team into action. Finding the right people, holding regular meetings, and making those team meetings meaningful are keys to a successful leadership team. The implementation of the team has had a positive effect on imaging services: the number of procedures has increased, the team is used as a communication tool for front-line staff, front-line staff are becoming more comfortable with making decisions.

  8. Impacts of dairy diagnostic teams on herd performance.

    PubMed

    Weinand, D; Conlin, B J

    2003-05-01

    This study evaluated impacts of educational diagnostic teams of consultants used to transfer technology to dairy farms. Herd management performance changes were measured by comparing Dairy Herd Improvement data from 38 project farms to data from herds that were geographical contemporaries. The value of focused goals for effecting change was also assessed. Interviews provided producers' perception of project outcomes and insight on organization and conduct of dairy diagnostic teams. Changes observed in project herds were small compared with controls with tendencies for increased herd size and improved milk production per cow. Focused goals had greater impacts on increasing herd size, milk per cow, first lactation peak milk, reducing age at first calving, and percentages of cows with subclinical mastitis. Time, money, facility limitations, labor, and alternative priorities were the most cited constraints to implementing changes. Satisfaction scores of producers were significantly related to the degree that team recommendations were followed. Improved attitudes, quality of life, and financial well-being were benefits listed by a majority of producers from participation in the project. If similar projects were to be offered, 83% said they would participate again, and 69% indicated they would pay at least some of the costs. Project farms served as demonstration farms for 1930 other producers in their respective locales, resulting in a multiplier effect of original advice given by consultant teams. Suggestions by farmer participants for improvements in dairy diagnostic teams included needs for at least some unbiased team members, more frequent meetings, more follow-up on recommendations, and consistency of recommendations with family goals.

  9. Team working in intensive care: current evidence and future endeavors.

    PubMed

    Richardson, Joanne; West, Michael A; Cuthbertson, Brian H

    2010-12-01

    It has recently been argued that the future of intensive care medicine will rely on high quality management and teamwork. Therefore, this review takes an organizational psychology perspective to examine the most recent research on the relationship between teamwork, care processes, and patient outcomes in intensive care. Interdisciplinary communication within a team is crucial for the development of negotiated shared treatment goals and short-team patient outcomes. Interventions for maximizing team communication have received substantial interest in recent literature. Intensive care coordination is not a linear process, and intensive care teams often fail to discuss how to implement goals, trigger and align activities, or reflect on their performance. Despite a move toward interdisciplinary team working, clinical decision-making is still problematic and continues to be perceived as a top-down and authoritative process. The topic of team leadership in intensive care is underexplored and requires further research. Based on findings from the most recent research evidence in medicine and management, four principles are identified for improving the effectiveness of team working in intensive care: engender professional efficacy, create stable teams and leaders, develop trust and participative safety, and enable frequent team reflexivity.

  10. Results from the Lunar Reconnaissance Orbiter Mission and Plans for the Extended Science Mission

    NASA Technical Reports Server (NTRS)

    Vondrak, Richard R.; Keller, J. W.; Chin, G.; Garvin, J.; Petro, N.

    2012-01-01

    The Lunar Reconnaissance Orbiter spacecraft (LRO), launched on June 18,2009, began with the goal of seeking safe landing sites for future robotic missions or the return of humans to the Moon as part of NASA's Exploration Systems Mission Directorate (ESMD). In addition, LRO's objectives included the search for surface resources and the measurement of the lunar radiation environment. After spacecraft commissioning, the ESMD phase of the mission began on September 15, 2009 and was completed on September 15, 2010 when operational responsibility for LRO was transferred to NASA's Science Mission Directorate (SMD). The SMD mission was scheduled for 2 years and completed in September of 2012. Under SMD, the Science Mission focused on a new set of goals related to understanding the history of the Moon, its current state, and what it can tell us about the evolution of the Solar System. Having recently marked the completion of the two-year Science Mission, we will review here the major results from the LRO for both exploration and science and discuss plans and objectives for the Extended Science that will last until September, 2014. Some results from the LRO mission are: the development of comprehensive high resolution maps and digital terrain models of the lunar surface; discoveries on the nature of hydrogen distribution, and by extension water, at the lunar poles; measurement of the daytime and nighttime temperature of the lunar surface including temperature down below 30 K in permanently shadowed regions (PSRs); direct measurement of Hg, H2, and CO deposits in the PSRs; evidence for recent tectonic activity on the Moon; and high resolution maps of the illumination conditions at the poles.

  11. The Lobster Mission

    NASA Technical Reports Server (NTRS)

    Barthelmy, Scott

    2011-01-01

    I will give an overview of the Goddard Lobster mission: the science goals, the two instruments, the overall instruments designs, with particular attention to the wide-field x-ray instrument (WFI) using the lobster-eye-like micro-channel optics.

  12. A Capabilities Based Assessment of the United States Air Force Critical Care Air Transport Team

    DTIC Science & Technology

    2013-09-01

    usually consist of a critical care physician, critical care nurse , and respiratory therapist. A Front-end Analysis has found several problems within...critically ill and wounded. This life-saving mission is executed by CCAT teams, which usually consist of a critical care physician, critical care nurse ...ill and wounded. This life-saving mission is executed by CCAT teams, which usually consist of a critical care physician, critical care nurse , and

  13. Decentralized Formation Flying Control in a Multiple-Team Hierarchy

    NASA Technical Reports Server (NTRS)

    Mueller, Joseph .; Thomas, Stephanie J.

    2005-01-01

    This paper presents the prototype of a system that addresses these objectives-a decentralized guidance and control system that is distributed across spacecraft using a multiple-team framework. The objective is to divide large clusters into teams of manageable size, so that the communication and computational demands driven by N decentralized units are related to the number of satellites in a team rather than the entire cluster. The system is designed to provide a high-level of autonomy, to support clusters with large numbers of satellites, to enable the number of spacecraft in the cluster to change post-launch, and to provide for on-orbit software modification. The distributed guidance and control system will be implemented in an object-oriented style using MANTA (Messaging Architecture for Networking and Threaded Applications). In this architecture, tasks may be remotely added, removed or replaced post-launch to increase mission flexibility and robustness. This built-in adaptability will allow software modifications to be made on-orbit in a robust manner. The prototype system, which is implemented in MATLAB, emulates the object-oriented and message-passing features of the MANTA software. In this paper, the multiple-team organization of the cluster is described, and the modular software architecture is presented. The relative dynamics in eccentric reference orbits is reviewed, and families of periodic, relative trajectories are identified, expressed as sets of static geometric parameters. The guidance law design is presented, and an example reconfiguration scenario is used to illustrate the distributed process of assigning geometric goals to the cluster. Next, a decentralized maneuver planning approach is presented that utilizes linear-programming methods to enact reconfiguration and coarse formation keeping maneuvers. Finally, a method for performing online collision avoidance is discussed, and an example is provided to gauge its performance.

  14. Mission X: Train Like an Astronaut Pilot Study

    NASA Technical Reports Server (NTRS)

    Lloyd, Charles W.; Olivotto, C.; Boese, A.; Spiero, F.; Galoforo, G.; Niihori, M.

    2011-01-01

    Mission X: Train Like an Astronaut is an international educational challenge focusing on fitness and nutrition as we encourage students to "train like an astronaut." Teams of students (aged 8-12) learn principles of healthy eating and exercise, compete for points by finishing training modules, and get excited about their future as "fit explorers." The 18 core exercises (targeting strength, endurance, coordination, balance, spatial awareness, and more) involve the same types of skills that astronauts learn in their training and use in spaceflight. This first-of-its-kind cooperative outreach program has allowed 14 space agencies and various partner institutions to work together to address quality health/fitness education, challenge students to be more physically active, increase awareness of the importance of lifelong health and fitness, teach students how fitness plays a vital role in human performance for exploration, and inspire and motivate students to pursue careers in STEM fields. The project was initiated in 2009 in response to a request by the International Space Life Sciences Working Group. USA, Netherlands, Italy, France, Germany, Austria, Colombia, Spain, and United Kingdom hosted teams for the pilot this past spring, and Japan held a modified version of the challenge. Several more agencies provided input into the preparations. Competing on 131 teams, more than 3700 students from 40 cities worldwide participated in the first round of Mission X. OUTCOMES AND BEST PRACTICES Members of the Mission X core team will highlight the outcomes of this international educational outreach pilot project, show video highlights of the challenge, provide the working group s initial assessment of the project and discuss the future potential of the effort. The team will also discuss ideas and best practices for international partnership in education outreach efforts from various agency perspectives and experiences

  15. Collaboration and Team Science: From Theory to Practice

    PubMed Central

    Gadlin, Howard

    2013-01-01

    Interdisciplinary efforts are becoming more critical for scientific discovery and translational research efforts. Highly integrated and interactive research teams share a number of features that contribute to their success in developing and sustaining their efforts over time. Through analysis of in-depth interviews with members of highly successful research teams and others that did not meet their goals or ended due to conflicts, we identified key elements that appear critical for team success and effectiveness. There is no debate that the scientific goal sits at the center of the collaborative effort. However, supporting features need to be in place to avoid the derailment of the team. Among the most important of these is trust: without trust the team dynamic runs the risk of deteriorating over time. Other critical factors of which both leaders and participants need to be aware include developing a shared vision, strategically identifying team members and purposefully building the team, promoting disagreement while containing conflict, and setting clear expectations for sharing credit and authorship. Self-awareness and strong communication skills contribute greatly to effective leadership and management strategies of scientific teams. While all successful teams share the characteristic of effectively carrying out these activities, there is no single formula for execution with every leader exemplifying different strengths and weaknesses. Successful scientific collaborations have strong leaders who are self -aware and are mindful of the many elements critical for supporting the science at the center of the effort. PMID:22525233

  16. Global Precipitation Measurement Mission: Architecture and Mission Concept

    NASA Technical Reports Server (NTRS)

    Bundas, David

    2005-01-01

    The Global Precipitation Measurement (GPM) Mission is a collaboration between the National Aeronautics and Space Administration (NASA) and the Japanese Aerospace Exploration Agency (JAXA), and other partners, with the goal of monitoring the diurnal and seasonal variations in precipitation over the surface of the earth. These measurements will be used to improve current climate models and weather forecasting, and enable improved storm and flood warnings. This paper gives an overview of the mission architecture and addresses some of the key trades that have been completed, including the selection of the Core Observatory s orbit, orbit maintenance trades, and design issues related to meeting orbital debris requirements.

  17. On Beyond Star Trek, the Role of Synthetic Biology in Nasa's Missions

    NASA Technical Reports Server (NTRS)

    Rothschild, Lynn J.

    2016-01-01

    The time has come to for NASA to exploit the nascent field of synthetic biology in pursuit of its mission, including aeronautics, earth science, astrobiology and notably, human exploration. Conversely, NASA advances the fundamental technology of synthetic biology as no one else can because of its unique expertise in the origin of life and life in extreme environments, including the potential for alternate life forms. This enables unique, creative "game changing" advances. NASA's requirement for minimizing upmass in flight will also drive the field toward miniaturization and automation. These drivers will greatly increase the utility of synthetic biology solutions for military, health in remote areas and commercial purposes. To this end, we have begun a program at NASA to explore the use of synthetic biology in NASA's missions, particularly space exploration. As part of this program, we began hosting an iGEM team of undergraduates drawn from Brown and Stanford Universities to conduct synthetic biology research at NASA Ames Research Center. The 2011 team (http://2011.igem.org/Team:Brown-Stanford) produced an award-winning project on using synthetic biology as a basis for a human Mars settlement and the 2012 team has expanded the use of synthetic biology to estimate the potential for life in the clouds of other planets (http://2012.igem.org/Team:Stanford-Brown; http://www.calacademy.org/sciencetoday/igem-competition/). More recent projects from the Stanford-Brown team have expanded our ideas of how synthetic biology can aid NASA's missions from "Synthetic BioCommunication" (http://2013.igem.org/Team:Stanford-Brown) to a "Biodegradable UAS (drone)" in collaboration with Spelman College (http://2014.igem.org/Team:StanfordBrownSpelman#SBS%20iGEM) and most recently, "Self-Folding Origami" (http://2015.igem.org/Team:Stanford-Brown), the winner of the 2015 award for Manufacturing.

  18. The Lunar Reconnaissance Orbiter Mission: Seven Years at the Moon - Accomplishments, Data, and Future Prospects

    NASA Astrophysics Data System (ADS)

    Petro, Noah; Keller, John

    2016-07-01

    The LRO Spacecraft has been orbiting the Moon for over 7 years (~91 lunations), and in that time data from the seven instruments has contributed to a revolution in our understanding of the Moon. Since launch the mission goals and instruments science questions have evolved, from the initial characterization of the lunar surface and its environment to studying the variability of surface hydration and measuring the flux of new craters that have formed during LRO's time in lunar orbit. The growing LRO dataset in the PDS presents a unique archive that allows for an unprecedented opportunity to study how an airless body changes over time. The LRO instrument suite [1] is performing nominally, with no significant performance issues since the mission entered the current extended mission. The Mini-RF instrument team is investigating new methods for collecting bistatic data using an Earth-based X-band transmitter [2] during a possible upcoming extended mission starting in September 2016, pending NASA approval. The LRO spacecraft has been in an elliptical, polar orbit with a low perilune over the South Pole since December 2011. This orbit minimizes annual fuel consumption, enabling LRO to use fuel to maximize opportunities for obtaining unique science (e.g., lunar eclipse measurements from Diviner, measuring spacecraft impacts by GRAIL and LADEE). The LRO instrument teams deliver data to the PDS every three months, data that includes raw, calibrated, and gridded/map products [3]. As of January, over 681TB has been archived. These higher-level data products include a number of resources that are useful for mission planners, in addition to planetary scientists. A focus of the mission has been on the South Pole, therefore a number of special products (e.g., illumination maps, high resolution topography, hydration maps) are available. Beyond the poles, high-resolution (~1-2 m spatial resolution) topographic products are available for select areas, as well as maps of rock abundance

  19. Collective-goal ascription increases cooperation in humans.

    PubMed

    Mitkidis, Panagiotis; Sørensen, Jesper; Nielbo, Kristoffer L; Andersen, Marc; Lienard, Pierre

    2013-01-01

    Cooperation is necessary in many types of human joint activity and relations. Evidence suggests that cooperation has direct and indirect benefits for the cooperators. Given how beneficial cooperation is overall, it seems relevant to investigate the various ways of enhancing individuals' willingness to invest in cooperative endeavors. We studied whether ascription of a transparent collective goal in a joint action promotes cooperation in a group. A total of 48 participants were assigned in teams of 4 individuals to either a "transparent goal-ascription" or an "opaque goal-ascription" condition. After the manipulation, the participants played an anonymous public goods game with another member of their team. We measured the willingness of participants to cooperate and their expectations about the other player's contribution. Between subjects analyses showed that transparent goal ascription impacts participants' likelihood to cooperate with each other in the future, thereby greatly increasing the benefits from social interactions. Further analysis showed that this could be explained with a change in expectations about the partner's behavior and by an emotional alignment of the participants. The study found that a transparent goal ascription is associated with an increase of cooperation. We propose several high-level mechanisms that could explain the observed effect: general affect modulation, trust, expectation and perception of collective efficacy.

  20. Management team learning orientation and business unit performance.

    PubMed

    Bunderson, J Stuart; Sutcliffe, Kathleen M

    2003-06-01

    Although research has suggested that teams can differ in the extent to which they encourage proactive learning and competence development among their members (a team learning orientation), the performance consequences of these differences are not well understood. Drawing from research on goal orientation and team learning, this article suggests that, although a team learning orientation can encourage adaptive behaviors that lead to improved performance, it is also possible for teams to compromise performance in the near term by overemphasizing learning, particularly when they have been performing well. A test of this proposition in a sample of business unit management teams provides strong support. The results confirm that an appropriate emphasis on learning can have positive consequences for team effectiveness.

  1. The ODINUS Mission Concept: a Mission to the Ice Giant Planets

    NASA Astrophysics Data System (ADS)

    Turrini, Diego; Politi, Romolo; Peron, Roberto; Grassi, Davide; Plainaki, Christina; Barbieri, Mauro; Massimo Lucchesi, David; Magni, Gianfranco; Altieri, Francesca; Cottini, Valeria; Gorius, Nicolas; Gaulme, Patrick; Schmider, François-Xavier; Adriani, Alberto; Piccioni, Giuseppe

    2014-05-01

    We present the scientific case and the mission concept for the comparative exploration of the ice giant planets Uranus and Neptune and their satellites with a pair of twin spacecraft: ODINUS (Origins, Dynamics and Interiors of Neptunian and Uranian Systems). The ODINUS proposal was submitted in response to the call for white papers for the definition of the themes of the L2 and L3 mission in the framework of the ESA Cosmic Vision 2015-2025 program. The goal of ODINUS is the advancement of our understanding of the ancient past of the Solar System and, more generally, of how planetary systems form and evolve. The mission concept is focused on providing elements to answer to the scientific themes of the Cosmic Vision 2015-2025 program: What are the conditions for planetary formation and the emergency of life? How does the Solar System work? What are the fundamental physical laws of the Universe? In order to achieve its goals, the ODINUS mission concept proposed the use of two twin spacecraft to be put in orbit around Uranus and Neptune respectively, with selected flybys of their satellites. The proposed measurements aim to study the atmospheres and magnetospheres of the planets, the surfaces of the satellites, and the interior structure and composition of both satellites and planets. An important possibility for performing fundamental physics studies (among them tests of general relativity theory) is offered by the cruise phase. After the extremely positive evaluation of ESA Senior Survey Committee, who stated that 'the exploration of the icy giants appears to be a timely milestone, fully appropriate for an L class mission', we discuss strategies to comparatively study Uranus and Neptune with future international missions.

  2. IMAGE Mission Science

    NASA Technical Reports Server (NTRS)

    Gallagher, D. L.; Fok, M.-C.; Fuselier, S.; Gladstone, G. R.; Green, J. L.; Fung, S. F.; Perez, J.; Reiff, P.; Roelof, E. C.; Wilson, G.

    1998-01-01

    Simultaneous, global measurement of major magnetospheric plasma systems will be performed for the first time with the Imager for Magnetopause-to-Aurora Global Exploration (IMAGE) Mission. The ring current, plasmasphere, and auroral systems will be imaged using energetic neutral and ultraviolet cameras. Quantitative remote measurement of the magnetosheath, plasmaspheric, and magnetospheric densities will be obtained through radio sounding by the Radio Plasma Imager. The IMAGE Mission will open a new era in global magnetospheric physics, while bringing with it new challenges in data analysis. An overview of the IMAGE Theory and Modeling team efforts will be presented, including the state of development of Internet tools that will be available to the science community for access and analysis of IMAGE observations.

  3. Terra Mission Operations: Launch to the Present (and Beyond)

    NASA Technical Reports Server (NTRS)

    Kelly, Angelita; Moyer, Eric; Mantziaras, Dimitrios; Case, Warren

    2014-01-01

    The Terra satellite, flagship of NASA's long-term Earth Observing System (EOS) Program, continues to provide useful earth science observations well past its 5-year design lifetime. This paper describes the evolution of Terra operations, including challenges and successes and the steps taken to preserve science requirements and prolong spacecraft life. Working cooperatively with the Terra science and instrument teams, including NASA's international partners, the mission operations team has successfully kept the Terra operating continuously, resolving challenges and adjusting operations as needed. Terra retains all of its observing capabilities (except Short Wave Infrared) despite its age. The paper also describes concepts for future operations. This paper will review the Terra spacecraft mission successes and unique spacecraft component designs that provided significant benefits extending mission life and science. In addition, it discusses special activities as well as anomalies and corresponding recovery efforts. Lastly, it discusses future plans for continued operations.

  4. Cassini End of Mission Preview

    NASA Image and Video Library

    2017-09-13

    Principle investigator for the Ion and Neutral Mass Spectrometer (INMS) at the Southwest Research Institute, Hunter Waite, points to the location of the INMS during a press conference previewing Cassini's End of Mission, Wednesday, Sept. 13, 2017 at NASA's Jet Propulsion Laboratory in Pasadena, California. Since its arrival in 2004, the Cassini-Huygens mission has been a discovery machine, revolutionizing our knowledge of the Saturn system and captivating us with data and images never before obtained with such detail and clarity. On Sept. 15, 2017, operators will deliberately plunge the spacecraft into Saturn, as Cassini gathered science until the end. The “plunge” ensures Saturn’s moons will remain pristine for future exploration. During Cassini’s final days, mission team members from all around the world gathered at NASA’s Jet Propulsion Laboratory, Pasadena, California, to celebrate the achievements of this historic mission. Photo Credit: (NASA/Joel Kowsky)

  5. The hemodialysis patient: object of diagnosis or part of the treatment team?

    PubMed

    Burnell, M S

    1997-04-01

    Through multidisciplinary diagnosis, the end-stage renal disease (ESRD) treatment team defines the patients's problems and sets goals to reach positive outcomes. Each of the team members has a voice in recommending strategies to reach these goals, because each has been trained in appropriate treatment objectives. Patient noncompliance (nonadherence) with team recommendations can be a major, ongoing problem for the team. The untrained, unhealthy, and often unconsulted amateur member of the team is the patient who is asked to carry out the team plan. Where is the patient's place on the team? There is no doubt that the patient can enhance the planning and development of the treatment objectives. But is the patient's presence seen as a hindrance to planning? More consideration needs to be given to this ongoing issue in an effort to achieve successful patient-oriented outcomes.

  6. Collaborative Mission Design at NASA Langley Research Center

    NASA Technical Reports Server (NTRS)

    Gough, Kerry M.; Allen, B. Danette; Amundsen, Ruth M.

    2005-01-01

    NASA Langley Research Center (LaRC) has developed and tested two facilities dedicated to increasing efficiency in key mission design processes, including payload design, mission planning, and implementation plan development, among others. The Integrated Design Center (IDC) is a state-of-the-art concurrent design facility which allows scientists and spaceflight engineers to produce project designs and mission plans in a real-time collaborative environment, using industry-standard physics-based development tools and the latest communication technology. The Mission Simulation Lab (MiSL), a virtual reality (VR) facility focused on payload and project design, permits engineers to quickly translate their design and modeling output into enhanced three-dimensional models and then examine them in a realistic full-scale virtual environment. The authors were responsible for envisioning both facilities and turning those visions into fully operational mission design resources at LaRC with multiple advanced capabilities and applications. In addition, the authors have created a synergistic interface between these two facilities. This combined functionality is the Interactive Design and Simulation Center (IDSC), a meta-facility which offers project teams a powerful array of highly advanced tools, permitting them to rapidly produce project designs while maintaining the integrity of the input from every discipline expert on the project. The concept-to-flight mission support provided by IDSC has shown improved inter- and intra-team communication and a reduction in the resources required for proposal development, requirements definition, and design effort.

  7. The power of "we": effects of psychological collectivism on team performance over time.

    PubMed

    Dierdorff, Erich C; Bell, Suzanne T; Belohlav, James A

    2011-03-01

    We examined the influences of different facets of psychological collectivism (Preference, Reliance, Concern, Norm Acceptance, and Goal Priority) on team functioning at 3 different performance depictions: initial team performance, end-state team performance, and team performance change over time. We also tested the extent to which team-member exchange moderated the relationships between facets of psychological collectivism and performance change over time. Results from multilevel growth modeling of 66 teams (N = 264) engaged in a business simulation revealed differential effects across facets of psychological collectivism and across different performance measurements. Whereas facets concerned with affiliation (Preference and Concern) were positively related to initial team performance, reliance was negatively related to initial team performance. Goal Priority was a strong predictor of end-state performance. Team-member exchange moderated the relationship between performance change and 3 of the 5 facets of psychological collectivism (Preference, Reliance, Norm Acceptance). Implications for team composition and team training are discussed. PsycINFO Database Record (c) 2011 APA, all rights reserved.

  8. Cassini End of Mission

    NASA Image and Video Library

    2017-09-15

    Associate administrator for NASA's Science Mission Directorate Thomas Zurbuchen, left, Cassini project scientist at JPL, Linda Spilker, second from left, director of NASA's Jet Propulsion Laboratory, Michael Watkins, center, director of NASA's Planetary Science Division, Jim Green, second from right, and director of the interplanetary network directorate at NASA's Jet Propulsion Laboratory, Keyur Patel, left, are seen in mission control, Friday, Sept. 15, 2017 at NASA's Jet Propulsion Laboratory in Pasadena, California. Since its arrival in 2004, the Cassini-Huygens mission has been a discovery machine, revolutionizing our knowledge of the Saturn system and captivating us with data and images never before obtained with such detail and clarity. On Sept. 15, 2017, operators deliberately plunged the spacecraft into Saturn, as Cassini gathered science until the end. Loss of contact with the Cassini spacecraft occurred at 7:55 a.m. EDT (4:55 a.m. PDT). The “plunge” ensures Saturn’s moons will remain pristine for future exploration. During Cassini’s final days, mission team members from all around the world gathered at NASA’s Jet Propulsion Laboratory, Pasadena, California, to celebrate the achievements of this historic mission. Photo Credit: (NASA/Joel Kowsky)

  9. Lessons Learned from Optical Payload for Lasercomm Science (OPALS) Mission Operations

    NASA Technical Reports Server (NTRS)

    Sindiy, Oleg V.; Abrahamson, Matthew J.; Biswas, Abhijit; Wright, Malcolm W.; Padams, Jordan H.; Konyha, Alexander L.

    2015-01-01

    This paper provides an overview of Optical Payload for Lasercomm Science (OPALS) activities and lessons learned during mission operations. Activities described cover the periods of commissioning, prime, and extended mission operations, during which primary and secondary mission objectives were achieved for demonstrating space-to-ground optical communications. Lessons learned cover Mission Operations System topics in areas of: architecture verification and validation, staffing, mission support area, workstations, workstation tools, interfaces with support services, supporting ground stations, team training, procedures, flight software upgrades, post-processing tools, and public outreach.

  10. Strategic Map for Enceladus Plume Biosignature Sample Return Missions

    NASA Astrophysics Data System (ADS)

    Sherwood, Brent; Yano, Hajime

    The discovery of jets emitting salty water from the interior of Saturn’s small moon Enceladus is one of the most astounding results of the Cassini mission to date. The measured presence of organic species in the resulting plume, the finding that the jet activity is valved by tidal stretching at apochrone, and the modeled lifetime of E-ring particles, all indicate that the textbook conditions for habitability are met at Enceladus today: liquid water, biologically available elements, and source of energy, longevity of conducive conditions. Enceladus may be the best place in our solar system to search for direct evidence of biomarkers, and the plume provides a way to sample for and even return them to Earth for detailed analysis. It is straightforward to imagine a Stardust-like, fly-through, plume particle and gas collection and return mission for Enceladus. An international team (LIFE, Life Investigation For Enceladus) has dedicated itself to pursuing such a flight project. Concept engineering and evaluation indicate that the associated technical, programmatic, regulatory, and cost issues are quite unlike the Stardust precedent however, not least because of such a mission’s Category-V, Restricted Earth Return, classification. The paper presents a strategic framework that systematically integrates the cultivation of science advocacy, resolution of diverse stakeholder issues, development of verifiable and affordable technical solutions, validation of cost estimation methods, alignment with other candidate astrobiology missions, complementarity of international agency goals, and finally the identification of appropriate research and flight-mission opportunities. Resolving and using this map is essential if we are to know the astrobiological state of Enceladus in our lifetime.

  11. The reablement team's voice: a qualitative study of how an integrated multidisciplinary team experiences participation in reablement.

    PubMed

    Hjelle, Kari Margrete; Skutle, Olbjørg; Førland, Oddvar; Alvsvåg, Herdis

    2016-01-01

    Reablement is an early and time-limited home-based rehabilitation intervention that emphasizes intensive, goal-oriented, and multidisciplinary assistance for people experiencing functional decline. Few empirical studies to date have examined the experiences of the integrated multidisciplinary teams involved in reablement. Accordingly, the aim of this study was to explore and describe how an integrated multidisciplinary team in Norway experienced participation in reablement. An integrated multidisciplinary team consisting of health care professionals with a bachelor's degree (including a physiotherapist, a social educator, occupational therapists, and nurses) and home-based care personnel without a bachelor's degree (auxiliary nurses and nursing assistants) participated in focus group discussions. Qualitative content analysis was used to analyze the resulting data. Three main themes emerged from the participants' experiences with participating in reablement, including "the older adult's goals are crucial", "a different way of thinking and acting - a shift in work culture", and "a better framework for cooperation and application of professional expertise and judgment". The integrated multidisciplinary team and the older adults collaborated and worked in the same direction to achieve the person's valued goals. The team supported the older adults in performing activities themselves rather than completing tasks for them. To facilitate cooperation and application of professional expertise and judgment, common meeting times and meeting places for communication and supervision were necessary. Structural factors that promote integrated multidisciplinary professional decisions include providing common meeting times and meeting places as well as sufficient time to apply professional knowledge when supervising and supporting older persons in everyday activities. These findings have implications for practice and suggest future directions for improving health care services. The

  12. STS-98 Flight Control Team Photo in the WFCR

    NASA Image and Video Library

    2001-01-08

    JSC2001-00001 (January 2001) --- The STS-98 astronaut crew poses with about five dozen flight controllers making up its ascent/entry team in the shuttle flight control room of the Johnson Space Center's Mission Control Center (MCC). Standing with the STS-98 insignia is flight director LeRoy Cain. He is flanked by astronauts Marsha S. Ivins, mission specialist, and Kenneth D. Cockrell, mission commander. Behind Cockrell is astronaut Robert L. Curbeam, Jr., mission specialist; and behind Ivins and Cain is astronaut Mark L. Polansky, pilot. Astronaut Thomas D. Jones, mission specialist (blue shirt) stands near the flight director sign. Astronaut Scott D. Altman, CAPCOM or Spacecraft Communicator, is immediately behind Cain. Launch is currently scheduled for February 6, 2001.

  13. Historical trends of participation of women in robotic spacecraft missions

    NASA Astrophysics Data System (ADS)

    Rathbun, Julie A.; Dones, Luke; Gay, Pamela; Cohen, Barbara; Horst, Sarah; Lakdawalla, Emily; Spickard, James; Milazzo, Moses; Sayanagi, Kunio M.; Schug, Joanna

    2015-11-01

    For many planetary scientists, being involved in a spacecraft mission is the highlight of a career. Many young scientists hope to one day be involved in such a mission. We will look at the science teams of several flagship-class spacecraft missions to look for trends in the representation of groups that are underrepresented in science. We will start with The Galileo, Cassini, and Europa missions to the outer solar system as representing missions that began in the 1980s, 1990s and 2010s respectively. We would also like to extend our analysis to smaller missions and those to targets other than the outer solar system.

  14. Integrated Human-Robotic Missions to the Moon and Mars: Mission Operations Design Implications

    NASA Technical Reports Server (NTRS)

    Mishkin, Andrew; Lee, Young; Korth, David; LeBlanc, Troy

    2007-01-01

    For most of the history of space exploration, human and robotic programs have been independent, and have responded to distinct requirements. The NASA Vision for Space Exploration calls for the return of humans to the Moon, and the eventual human exploration of Mars; the complexity of this range of missions will require an unprecedented use of automation and robotics in support of human crews. The challenges of human Mars missions, including roundtrip communications time delays of 6 to 40 minutes, interplanetary transit times of many months, and the need to manage lifecycle costs, will require the evolution of a new mission operations paradigm far less dependent on real-time monitoring and response by an Earthbound operations team. Robotic systems and automation will augment human capability, increase human safety by providing means to perform many tasks without requiring immediate human presence, and enable the transfer of traditional mission control tasks from the ground to crews. Developing and validating the new paradigm and its associated infrastructure may place requirements on operations design for nearer-term lunar missions. The authors, representing both the human and robotic mission operations communities, assess human lunar and Mars mission challenges, and consider how human-robot operations may be integrated to enable efficient joint operations, with the eventual emergence of a unified exploration operations culture.

  15. Integrated Human-Robotic Missions to the Moon and Mars: Mission Operations Design Implications

    NASA Technical Reports Server (NTRS)

    Korth, David; LeBlanc, Troy; Mishkin, Andrew; Lee, Young

    2006-01-01

    For most of the history of space exploration, human and robotic programs have been independent, and have responded to distinct requirements. The NASA Vision for Space Exploration calls for the return of humans to the Moon, and the eventual human exploration of Mars; the complexity of this range of missions will require an unprecedented use of automation and robotics in support of human crews. The challenges of human Mars missions, including roundtrip communications time delays of 6 to 40 minutes, interplanetary transit times of many months, and the need to manage lifecycle costs, will require the evolution of a new mission operations paradigm far less dependent on real-time monitoring and response by an Earthbound operations team. Robotic systems and automation will augment human capability, increase human safety by providing means to perform many tasks without requiring immediate human presence, and enable the transfer of traditional mission control tasks from the ground to crews. Developing and validating the new paradigm and its associated infrastructure may place requirements on operations design for nearer-term lunar missions. The authors, representing both the human and robotic mission operations communities, assess human lunar and Mars mission challenges, and consider how human-robot operations may be integrated to enable efficient joint operations, with the eventual emergence of a unified exploration operations culture.

  16. NASA'S Space Launch System Mission Capabilities for Exploration

    NASA Technical Reports Server (NTRS)

    Creech, Stephen D.; Crumbly, Christopher M.; Robinson, Kimberly F.

    2015-01-01

    Designed to enable human space exploration missions, including eventual landings on Mars, NASA’s Space Launch System (SLS) represents a unique launch capability with a wide range of utilization opportunities, from delivering habitation systems into the lunar vicinity to high-energy transits through the outer solar system. Developed with the goals of safety, affordability and sustainability in mind, SLS is a foundational capability for NASA’s future plans for exploration, along with the Orion crew vehicle and upgraded ground systems at the agency’s Kennedy Space Center. Substantial progress has been made toward the first launch of the initial configuration of SLS, which will be able to deliver more than 70 metric tons of payload into low Earth orbit (LEO), greater mass-to-orbit capability than any contemporary launch vehicle. The vehicle will then be evolved into more powerful configurations, culminating with the capability to deliver more than 130 metric tons to LEO, greater even than the Saturn V rocket that enabled human landings on the moon. SLS will also be able to carry larger payload fairings than any contemporary launch vehicle, and will offer opportunities for co-manifested and secondary payloads. Because of its substantial mass-lift capability, SLS will also offer unrivaled departure energy, enabling mission profiles currently not possible. Early collaboration with science teams planning future decadal-class missions have contributed to a greater understanding of the vehicle’s potential range of utilization. This presentation will discuss the potential opportunities this vehicle poses for the planetary sciences community, relating the vehicle’s evolution to practical implications for mission capture. As this paper will explain, SLS will be a global launch infrastructure asset, employing sustainable solutions and technological innovations to deliver capabilities for space exploration to power human and robotic systems beyond our Moon and in to

  17. NASA's Space Launch System Mission Capabilities for Exploration

    NASA Technical Reports Server (NTRS)

    Creech, Stephen D.; Crumbly, Christopher M.; Robinson, Kimberly F.

    2015-01-01

    Designed to enable human space exploration missions, including eventual landings on Mars, NASA's Space Launch System (SLS) represents a unique launch capability with a wide range of utilization opportunities, from delivering habitation systems into the lunar vicinity to high-energy transits through the outer solar system. Developed with the goals of safety, affordability and sustainability in mind, SLS is a foundational capability for NASA's future plans for exploration, along with the Orion crew vehicle and upgraded ground systems at the agency's Kennedy Space Center. Substantial progress has been made toward the first launch of the initial configuration of SLS, which will be able to deliver more than 70 metric tons of payload into low Earth orbit (LEO), greater mass-to-orbit capability than any contemporary launch vehicle. The vehicle will then be evolved into more powerful configurations, culminating with the capability to deliver more than 130 metric tons to LEO, greater even than the Saturn V rocket that enabled human landings on the moon. SLS will also be able to carry larger payload fairings than any contemporary launch vehicle, and will offer opportunities for co-manifested and secondary payloads. Because of its substantial mass-lift capability, SLS will also offer unrivaled departure energy, enabling mission profiles currently not possible. Early collaboration with science teams planning future decadal-class missions have contributed to a greater understanding of the vehicle's potential range of utilization. This presentation will discuss the potential opportunities this vehicle poses for the planetary sciences community, relating the vehicle's evolution to practical implications for mission capture. As this paper will explain, SLS will be a global launch infrastructure asset, employing sustainable solutions and technological innovations to deliver capabilities for space exploration to power human and robotic systems beyond our Moon and in to deep space.

  18. Future Time Perspective in Occupational Teams: Do Older Workers Prefer More Familiar Teams?

    PubMed Central

    Gärtner, Laura U. A.; Hertel, Guido

    2017-01-01

    Working in teams is quite popular across different industries and cultures. While some of these teams exist for longer time periods, other teams collaborate only for short periods and members switch into new teams after goals are accomplished. However, workers’ preferences for joining a new team might vary in different ways. Based on Carstensen’s socioemotional selectivity theory, we predict that emotionally meaningful teams are prioritized when occupational future time perspective (OFTP) is perceived as limited. Building and expanding on studies outside of the work context, we expected that older as compared to younger workers prefer more familiar teams, and that this effect is mediated by workers’ OFTP. Moreover, we assumed that experimentally manipulated OFTP can change such team preferences. The hypotheses were tested in an online scenario study using three experimental conditions (within-person design). Four hundred and fifty-four workers (57% female, age M = 45.98, SD = 11.46) were asked to choose between a familiar and a new team in three consecutive trials: under an unspecified OFTP (baseline), under an expanded OFTP (amendment of retirement age), and under a restricted OFTP (insolvency of the current company). Whereas the baseline condition was always first, the order of the second and third conditions was randomized among participants. In the baseline condition, results showed the expected mediation effect of workers’ OFTP on the relation between workers’ age and preference for a familiar over a new team. Higher age was associated with more limited OFTP, which in turn was associated with higher preference for a familiar over a new team. Moreover, experimentally restricting OFTP increased preference for a familiar team over a new team regardless of workers’ age, providing further evidence for the assumed causal processes and showing interesting avenues for practical interventions in occupational teams. PMID:29018376

  19. Future Time Perspective in Occupational Teams: Do Older Workers Prefer More Familiar Teams?

    PubMed

    Gärtner, Laura U A; Hertel, Guido

    2017-01-01

    Working in teams is quite popular across different industries and cultures. While some of these teams exist for longer time periods, other teams collaborate only for short periods and members switch into new teams after goals are accomplished. However, workers' preferences for joining a new team might vary in different ways. Based on Carstensen's socioemotional selectivity theory, we predict that emotionally meaningful teams are prioritized when occupational future time perspective (OFTP) is perceived as limited. Building and expanding on studies outside of the work context, we expected that older as compared to younger workers prefer more familiar teams, and that this effect is mediated by workers' OFTP. Moreover, we assumed that experimentally manipulated OFTP can change such team preferences. The hypotheses were tested in an online scenario study using three experimental conditions (within-person design). Four hundred and fifty-four workers (57% female, age M = 45.98, SD = 11.46) were asked to choose between a familiar and a new team in three consecutive trials: under an unspecified OFTP (baseline), under an expanded OFTP (amendment of retirement age), and under a restricted OFTP (insolvency of the current company). Whereas the baseline condition was always first, the order of the second and third conditions was randomized among participants. In the baseline condition, results showed the expected mediation effect of workers' OFTP on the relation between workers' age and preference for a familiar over a new team. Higher age was associated with more limited OFTP, which in turn was associated with higher preference for a familiar over a new team. Moreover, experimentally restricting OFTP increased preference for a familiar team over a new team regardless of workers' age, providing further evidence for the assumed causal processes and showing interesting avenues for practical interventions in occupational teams.

  20. Radioisotope Power Systems Reference Book for Mission Designers and Planners

    NASA Technical Reports Server (NTRS)

    Lee, Young; Bairstow, Brian

    2015-01-01

    The RPS Program's Program Planning and Assessment (PPA) Office commissioned the Mission Analysis team to develop the Radioisotope Power Systems (RPS) Reference Book for Mission Planners and Designers to define a baseline of RPS technology capabilities with specific emphasis on performance parameters and technology readiness. The main objective of this book is to provide RPS technology information that could be utilized by future mission concept studies and concurrent engineering practices. A progress summary from the major branches of RPS technology research provides mission analysis teams with a vital tool for assessing the RPS trade space, and provides concurrent engineering centers with a consistent set of guidelines for RPS performance characteristics. This book will be iterated when substantial new information becomes available to ensure continued relevance, serving as one of the cornerstone products of the RPS PPA Office. This book updates the original 2011 internal document, using data from the relevant publicly released RPS technology references and consultations with RPS technologists. Each performance parameter and RPS product subsection has been reviewed and cleared by at least one subject matter representative. A virtual workshop was held to reach consensus on the scope and contents of the book, and the definitions and assumptions that should be used. The subject matter experts then reviewed and updated the appropriate sections of the book. The RPS Mission Analysis Team then performed further updates and crosschecked the book for consistency. Finally, a second virtual workshop was held to ensure all subject matter experts and stakeholders concurred on the contents.