Sample records for technical baseline requirements

  1. Solid Waste Program technical baseline description

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carlson, A.B.

    1994-07-01

    The system engineering approach has been taken to describe the technical baseline under which the Solid Waste Program is currently operating. The document contains a mission analysis, function analysis, system definition, documentation requirements, facility and project bases, and uncertainties facing the program.

  2. Owning the program technical baseline for future space systems acquisition: program technical baseline tracking tool

    NASA Astrophysics Data System (ADS)

    Nguyen, Tien M.; Guillen, Andy T.; Hant, James J.; Kizer, Justin R.; Min, Inki A.; Siedlak, Dennis J. L.; Yoh, James

    2017-05-01

    The U.S. Air Force (USAF) has recognized the needs for owning the program and technical knowledge within the Air Force concerning the systems being acquired to ensure success. This paper extends the previous work done by the authors [1-2] on the "Resilient Program Technical Baseline Framework for Future Space Systems" and "Portfolio Decision Support Tool (PDST)" to the development and implementation of the Program and Technical Baseline (PTB) Tracking Tool (PTBTL) for the DOD acquisition life cycle. The paper describes the "simplified" PTB tracking model with a focus on the preaward phases and discusses how to implement this model in PDST.

  3. TWRS technical baseline database manager definition document

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Acree, C.D.

    1997-08-13

    This document serves as a guide for using the TWRS Technical Baseline Database Management Systems Engineering (SE) support tool in performing SE activities for the Tank Waste Remediation System (TWRS). This document will provide a consistent interpretation of the relationships between the TWRS Technical Baseline Database Management software and the present TWRS SE practices. The Database Manager currently utilized is the RDD-1000 System manufactured by the Ascent Logic Corporation. In other documents, the term RDD-1000 may be used interchangeably with TWRS Technical Baseline Database Manager.

  4. COMSATCOM service technical baseline strategy development approach using PPBW concept

    NASA Astrophysics Data System (ADS)

    Nguyen, Tien M.; Guillen, Andy T.

    2016-05-01

    This paper presents an innovative approach to develop a Commercial Satellite Communications (COMSATCOM) service Technical Baseline (TB) and associated Program Baseline (PB) strategy using Portable Pool Bandwidth (PPBW) concept. The concept involves trading of the purchased commercial transponders' Bandwidths (BWs) with existing commercial satellites' bandwidths participated in a "designated pool bandwidth"3 according to agreed terms and conditions. Space Missile Systems Center (SMC) has been implementing the Better Buying Power (BBP 3.0) directive4 and recommending the System Program Offices (SPO) to own the Program and Technical Baseline (PTB) [1, 2] for the development of flexible acquisition strategy and achieving affordability and increased in competition. This paper defines and describes the critical PTB parameters and associated requirements that are important to the government SPO for "owning" an affordable COMSATCOM services contract using PPBW trading concept. The paper describes a step-by-step approach to optimally perform the PPBW trading to meet DoD and its stakeholders (i) affordability requirement, and (ii) fixed and variable bandwidth requirements by optimizing communications performance, cost and PPBW accessibility in terms of Quality of Services (QoS), Bandwidth Sharing Ratio (BSR), Committed Information Rate (CIR), Burstable Information Rate (BIR), Transponder equivalent bandwidth (TPE) and transponder Net Presence Value (NPV). The affordable optimal solution that meets variable bandwidth requirements will consider the operating and trading terms and conditions described in the Fair Access Policy (FAP).

  5. 40 CFR 80.92 - Baseline auditor requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Baseline auditor requirements. 80.92... (CONTINUED) REGULATION OF FUELS AND FUEL ADDITIVES Anti-Dumping § 80.92 Baseline auditor requirements. (a... determination methodology, resulting baseline fuel parameter, volume and emissions values verified by an auditor...

  6. Sortie laboratory, phase B technical summary. [design and operational requirements

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The design and operational requirements which evolved from Sortie Lab (SL) analysis are summarized. A source of requirements for systems is given along with experimental support for the SL, baseline. Basic design data covered include: configuration definition, mission analysis, experimental integration, safety, and logistics. A technical summary outlines characteristics which reflect the influence of the growth in SL capability and the results of the mission and operational analysis. Each of the selected areas is described in terms of objectives, equipment, operational concept, and support requirements.

  7. 10 CFR 76.87 - Technical safety requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Technical safety requirements. 76.87 Section 76.87 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) CERTIFICATION OF GASEOUS DIFFUSION PLANTS Safety § 76.87 Technical safety requirements. (a) The Corporation shall establish technical safety requirements. In...

  8. 10 CFR 76.87 - Technical safety requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Technical safety requirements. 76.87 Section 76.87 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) CERTIFICATION OF GASEOUS DIFFUSION PLANTS Safety § 76.87 Technical safety requirements. (a) The Corporation shall establish technical safety requirements. In...

  9. 10 CFR 76.87 - Technical safety requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Technical safety requirements. 76.87 Section 76.87 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) CERTIFICATION OF GASEOUS DIFFUSION PLANTS Safety § 76.87 Technical safety requirements. (a) The Corporation shall establish technical safety requirements. In...

  10. 10 CFR 76.87 - Technical safety requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Technical safety requirements. 76.87 Section 76.87 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) CERTIFICATION OF GASEOUS DIFFUSION PLANTS Safety § 76.87 Technical safety requirements. (a) The Corporation shall establish technical safety requirements. In...

  11. 10 CFR 76.87 - Technical safety requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Technical safety requirements. 76.87 Section 76.87 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) CERTIFICATION OF GASEOUS DIFFUSION PLANTS Safety § 76.87 Technical safety requirements. (a) The Corporation shall establish technical safety requirements. In...

  12. 10 CFR 830.205 - Technical safety requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... must: (1) Develop technical safety requirements that are derived from the documented safety analysis... 10 Energy 4 2010-01-01 2010-01-01 false Technical safety requirements. 830.205 Section 830.205 Energy DEPARTMENT OF ENERGY NUCLEAR SAFETY MANAGEMENT Safety Basis Requirements § 830.205 Technical...

  13. 10 CFR 830.205 - Technical safety requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... must: (1) Develop technical safety requirements that are derived from the documented safety analysis... 10 Energy 4 2011-01-01 2011-01-01 false Technical safety requirements. 830.205 Section 830.205 Energy DEPARTMENT OF ENERGY NUCLEAR SAFETY MANAGEMENT Safety Basis Requirements § 830.205 Technical...

  14. 47 CFR 80.659 - Technical requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Technical requirements. 80.659 Section 80.659 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES STATIONS IN THE MARITIME SERVICES Maritime Support Stations § 80.659 Technical requirements. The authorized frequency...

  15. 30 CFR 7.404 - Technical requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Technical requirements. 7.404 Section 7.404 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR TESTING, EVALUATION, AND... Cable Splice Kits § 7.404 Technical requirements. (a) Electric cables and splices shall be flame...

  16. 47 CFR 15.15 - General technical requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false General technical requirements. 15.15 Section 15.15 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL RADIO FREQUENCY DEVICES General § 15.15 General technical requirements. (a) An intentional or unintentional radiator shall be...

  17. 15 CFR 911.8 - Technical requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... PROCEDURES CONCERNING USE OF THE NOAA SPACE-BASED DATA COLLECTION SYSTEMS § 911.8 Technical requirements. (a) All platform operators of the NOAA DCS must use a data collection platform radio set whose technical...

  18. 15 CFR 911.8 - Technical requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... PROCEDURES CONCERNING USE OF THE NOAA SPACE-BASED DATA COLLECTION SYSTEMS § 911.8 Technical requirements. (a) All platform operators of the NOAA DCS must use a data collection platform radio set whose technical...

  19. 15 CFR 911.8 - Technical requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... PROCEDURES CONCERNING USE OF THE NOAA SPACE-BASED DATA COLLECTION SYSTEMS § 911.8 Technical requirements. (a) All platform operators of the NOAA DCS must use a data collection platform radio set whose technical...

  20. 15 CFR 911.8 - Technical requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... PROCEDURES CONCERNING USE OF THE NOAA SPACE-BASED DATA COLLECTION SYSTEMS § 911.8 Technical requirements. (a) All platform operators of the NOAA DCS must use a data collection platform radio set whose technical...

  1. 15 CFR 911.8 - Technical requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... PROCEDURES CONCERNING USE OF THE NOAA SPACE-BASED DATA COLLECTION SYSTEMS § 911.8 Technical requirements. (a) All platform operators of the NOAA DCS must use a data collection platform radio set whose technical...

  2. Technical parameters for specifying imagery requirements

    NASA Technical Reports Server (NTRS)

    Coan, Paul P.; Dunnette, Sheri J.

    1994-01-01

    Providing visual information acquired from remote events to various operators, researchers, and practitioners has become progressively more important as the application of special skills in alien or hazardous situations increases. To provide an understanding of the technical parameters required to specify imagery, we have identified, defined, and discussed seven salient characteristics of images: spatial resolution, linearity, luminance resolution, spectral discrimination, temporal discrimination, edge definition, and signal-to-noise ratio. We then describe a generalizing imaging system and identified how various parts of the system affect the image data. To emphasize the different applications of imagery, we have constrasted the common television system with the significant parameters of a televisual imaging system for technical applications. Finally, we have established a method by which the required visual information can be specified by describing certain technical parameters which are directly related to the information content of the imagery. This method requires the user to complete a form listing all pertinent data requirements for the imagery.

  3. 40 CFR 58.11 - Network technical requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Network technical requirements. 58.11... (CONTINUED) AMBIENT AIR QUALITY SURVEILLANCE Monitoring Network § 58.11 Network technical requirements. (a)(1... A to this part when operating the SLAMS networks. (2) Beginning January 1, 2009, State and local...

  4. 40 CFR 58.11 - Network technical requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 5 2011-07-01 2011-07-01 false Network technical requirements. 58.11... (CONTINUED) AMBIENT AIR QUALITY SURVEILLANCE Monitoring Network § 58.11 Network technical requirements. (a)(1... A to this part when operating the SLAMS networks. (2) Beginning January 1, 2009, State and local...

  5. Managing Information On Technical Requirements

    NASA Technical Reports Server (NTRS)

    Mauldin, Lemuel E., III; Hammond, Dana P.

    1993-01-01

    Technical Requirements Analysis and Control Systems/Initial Operating Capability (TRACS/IOC) computer program provides supplemental software tools for analysis, control, and interchange of project requirements so qualified project members have access to pertinent project information, even if in different locations. Enables users to analyze and control requirements, serves as focal point for project requirements, and integrates system supporting efficient and consistent operations. TRACS/IOC is HyperCard stack for use on Macintosh computers running HyperCard 1.2 or later and Oracle 1.2 or later.

  6. Technical requirements for bioassay support services

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hickman, D.P.; Anderson, A.L.

    1991-05-01

    This document provides the technical basis for the Chem-Nuclear Geotech (Geotech) bioassay program. It includes information and details that can be used as a model in providing technical contents and requirements for bioassay laboratory support, either internally or in solicitations by Geotech to obtain subcontractor laboratory support. It provides a detailed summary and description of the types of bioassay samples to be expected in support of Geotech remedial projects for the US Department of Energy and the bioassay services and analytical requirements necessary to process such samples, including required limits of sensitivity. General responsibilities of the bioassay laboratory are alsomore » addressed, including quality assurance. Peripheral information of importance to the program is included in the appendices of this document. 7 tabs.« less

  7. Integrated Baseline Review (IBR) Handbook

    NASA Technical Reports Server (NTRS)

    2013-01-01

    An Integrated Baseline Review (IBR) is a review of a supplier?s Performance Measurement Baseline (PMB). It is conducted by Program/Project Managers and their technical staffs on contracts and in-house work requiring compliance with NASA Earned Value Management System (EVMS) policy as defined in program/project policy, NPR 7120.5, or in NASA Federal Acquisition Regulations. The IBR Handbook may also be of use to those responsible for preparing the Terms of Reference for internal project reviews. While risks may be identified and actions tracked as a result of the IBR, it is important to note that an IBR cannot be failed.

  8. 47 CFR 80.273 - Technical requirements for radar equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Technical requirements for radar equipment. 80... Technical requirements for radar equipment. (a) Radar installations on board ships that are required by the Safety Convention or the U.S. Coast Guard to be equipped with radar must comply with the documents...

  9. 47 CFR 80.273 - Technical requirements for radar equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Technical requirements for radar equipment. 80... Technical requirements for radar equipment. (a) Radar installations on board ships that are required by the Safety Convention or the U.S. Coast Guard to be equipped with radar must comply with the documents...

  10. Technical Excellence: A Requirement for Good Engineering

    NASA Technical Reports Server (NTRS)

    Gill, Paul S.; Vaughan, William W.

    2008-01-01

    Technical excellence is a requirement for good engineering. Technical excellence has many different ways of expressing itself within engineering. NASA has initiatives that address the enhancement of the Agency's technical excellence and thrust to maintain the associated high level of performance by the Agency on current programs/projects and as it moves into the Constellation Program and the return to the Moon with plans to visit Mars. This paper addresses some of the key initiatives associated with NASA's technical excellence thrust. Examples are provided to illustrate some results being achieved and plans to enhance these initiatives.

  11. Career and Technical Education Administration: Requirements, Certification/Licensure, and Preparation

    ERIC Educational Resources Information Center

    Zirkle, Christopher J.; Jeffery, Jeremy O.

    2017-01-01

    The current climate of career and technical administration requirements in all 50 states was detailed and explored. An increasing number of states are not requiring specific career-technical administration certification/licensure in order to oversee secondary career and technical education (CTE) programs, with more states moving towards a general…

  12. 47 CFR 15.511 - Technical requirements for surveillance systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 1 2013-10-01 2013-10-01 false Technical requirements for surveillance systems... DEVICES Ultra-Wideband Operation § 15.511 Technical requirements for surveillance systems. (a) The UWB... surveillance systems operated by law enforcement, fire or emergency rescue organizations or by manufacturers...

  13. 47 CFR 15.511 - Technical requirements for surveillance systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false Technical requirements for surveillance systems... DEVICES Ultra-Wideband Operation § 15.511 Technical requirements for surveillance systems. (a) The UWB... surveillance systems operated by law enforcement, fire or emergency rescue organizations or by manufacturers...

  14. 47 CFR 15.511 - Technical requirements for surveillance systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false Technical requirements for surveillance systems... DEVICES Ultra-Wideband Operation § 15.511 Technical requirements for surveillance systems. (a) The UWB... surveillance systems operated by law enforcement, fire or emergency rescue organizations or by manufacturers...

  15. 47 CFR 15.511 - Technical requirements for surveillance systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Technical requirements for surveillance systems... DEVICES Ultra-Wideband Operation § 15.511 Technical requirements for surveillance systems. (a) The UWB... surveillance systems operated by law enforcement, fire or emergency rescue organizations or by manufacturers...

  16. 47 CFR 15.511 - Technical requirements for surveillance systems.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 1 2014-10-01 2014-10-01 false Technical requirements for surveillance systems... DEVICES Ultra-Wideband Operation § 15.511 Technical requirements for surveillance systems. (a) The UWB... surveillance systems operated by law enforcement, fire or emergency rescue organizations or by manufacturers...

  17. 47 CFR 15.517 - Technical requirements for indoor UWB systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Technical requirements for indoor UWB systems. 15.517 Section 15.517 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL RADIO FREQUENCY DEVICES Ultra-Wideband Operation § 15.517 Technical requirements for indoor UWB systems. (a) Operation...

  18. 47 CFR 15.513 - Technical requirements for medical imaging systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Technical requirements for medical imaging systems. 15.513 Section 15.513 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL RADIO FREQUENCY DEVICES Ultra-Wideband Operation § 15.513 Technical requirements for medical imaging systems. (a) The UWB...

  19. 47 CFR 15.515 - Technical requirements for vehicular radar systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false Technical requirements for vehicular radar... DEVICES Ultra-Wideband Operation § 15.515 Technical requirements for vehicular radar systems. (a..., changing gears, or engaging a turn signal. (b) The UWB bandwidth of a vehicular radar system operating...

  20. 47 CFR 15.515 - Technical requirements for vehicular radar systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Technical requirements for vehicular radar... DEVICES Ultra-Wideband Operation § 15.515 Technical requirements for vehicular radar systems. (a..., changing gears, or engaging a turn signal. (b) The UWB bandwidth of a vehicular radar system operating...

  1. 47 CFR 15.515 - Technical requirements for vehicular radar systems.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 1 2014-10-01 2014-10-01 false Technical requirements for vehicular radar... DEVICES Ultra-Wideband Operation § 15.515 Technical requirements for vehicular radar systems. (a..., changing gears, or engaging a turn signal. (b) The UWB bandwidth of a vehicular radar system operating...

  2. 47 CFR 15.515 - Technical requirements for vehicular radar systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 1 2013-10-01 2013-10-01 false Technical requirements for vehicular radar... DEVICES Ultra-Wideband Operation § 15.515 Technical requirements for vehicular radar systems. (a..., changing gears, or engaging a turn signal. (b) The UWB bandwidth of a vehicular radar system operating...

  3. 47 CFR 15.515 - Technical requirements for vehicular radar systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false Technical requirements for vehicular radar... DEVICES Ultra-Wideband Operation § 15.515 Technical requirements for vehicular radar systems. (a..., changing gears, or engaging a turn signal. (b) The UWB bandwidth of a vehicular radar system operating...

  4. 38 CFR 61.52 - Threshold requirements for technical assistance grant applications.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Threshold requirements....52 Threshold requirements for technical assistance grant applications. To be eligible for a technical assistance grant, an applicant must meet the following threshold requirements: (a) The application included...

  5. 38 CFR 61.52 - Threshold requirements for technical assistance grant applications.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2012-07-01 2012-07-01 false Threshold requirements....52 Threshold requirements for technical assistance grant applications. To be eligible for a technical assistance grant, an applicant must meet the following threshold requirements: (a) The application included...

  6. 47 CFR 74.861 - Technical requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., AUXILIARY, SPECIAL BROADCAST AND OTHER PROGRAM DISTRIBUTIONAL SERVICES Low Power Auxiliary Stations § 74.861 Technical requirements. (a) Transmitter power is the power at the transmitter output terminals and delivered... the purpose of this subpart, the transmitter power is the carrier power. (b) Each authorization for a...

  7. 47 CFR 68.604 - Requirements for submitting technical criteria.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 3 2010-10-01 2010-10-01 false Requirements for submitting technical criteria. 68.604 Section 68.604 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER...) may establish technical criteria for terminal equipment pursuant to ANSI consensus decision-making...

  8. 30 CFR 7.24 - Technical requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Brattice Cloth and Ventilation Tubing § 7.24 Technical requirements. (a) Brattice cloth shall be flame resistant when tested in accordance with... MSHA-approved brattice cloth. If a supporting structure is used, it shall be metal or other...

  9. 30 CFR 7.24 - Technical requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Brattice Cloth and Ventilation Tubing § 7.24 Technical requirements. (a) Brattice cloth shall be flame resistant when tested in accordance with... MSHA-approved brattice cloth. If a supporting structure is used, it shall be metal or other...

  10. 30 CFR 7.24 - Technical requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Brattice Cloth and Ventilation Tubing § 7.24 Technical requirements. (a) Brattice cloth shall be flame resistant when tested in accordance with... MSHA-approved brattice cloth. If a supporting structure is used, it shall be metal or other...

  11. 30 CFR 7.24 - Technical requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Brattice Cloth and Ventilation Tubing § 7.24 Technical requirements. (a) Brattice cloth shall be flame resistant when tested in accordance with... MSHA-approved brattice cloth. If a supporting structure is used, it shall be metal or other...

  12. 30 CFR 7.24 - Technical requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Brattice Cloth and Ventilation Tubing § 7.24 Technical requirements. (a) Brattice cloth shall be flame resistant when tested in accordance with... MSHA-approved brattice cloth. If a supporting structure is used, it shall be metal or other...

  13. 32 CFR 203.17 - Technical assistance provider reporting requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 2 2010-07-01 2010-07-01 false Technical assistance provider reporting requirements. 203.17 Section 203.17 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY... technical assistance provider shall submit progress reports, financial status reports, materials prepared...

  14. 32 CFR 203.17 - Technical assistance provider reporting requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 2 2014-07-01 2014-07-01 false Technical assistance provider reporting requirements. 203.17 Section 203.17 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY... technical assistance provider shall submit progress reports, financial status reports, materials prepared...

  15. 32 CFR 203.17 - Technical assistance provider reporting requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 2 2013-07-01 2013-07-01 false Technical assistance provider reporting requirements. 203.17 Section 203.17 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY... technical assistance provider shall submit progress reports, financial status reports, materials prepared...

  16. 32 CFR 203.17 - Technical assistance provider reporting requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 2 2011-07-01 2011-07-01 false Technical assistance provider reporting requirements. 203.17 Section 203.17 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY... technical assistance provider shall submit progress reports, financial status reports, materials prepared...

  17. 32 CFR 203.17 - Technical assistance provider reporting requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 2 2012-07-01 2012-07-01 false Technical assistance provider reporting requirements. 203.17 Section 203.17 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY... technical assistance provider shall submit progress reports, financial status reports, materials prepared...

  18. 30 CFR 7.44 - Technical requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Battery Assemblies § 7.44 Technical requirements. (a)(1) Battery boxes and covers constructed of AISI 1010 hot rolled steel shall have the following minimum thicknesses based on the total weight of a unit of the battery assembly charged and ready...

  19. 30 CFR 7.44 - Technical requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Battery Assemblies § 7.44 Technical requirements. (a)(1) Battery boxes and covers constructed of AISI 1010 hot rolled steel shall have the following minimum thicknesses based on the total weight of a unit of the battery assembly charged and ready...

  20. Review of PREPA Technical Requirements for Interconnecting Wind and Solar Generation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gevorgian, Vahan; Booth, Sarah

    2013-11-01

    The Puerto Rico Electric Power Authority developed the minimum technical requirements for interconnection of wind turbine generation and photovoltaic power plants. NREL has conducted a review of these requirements based on generic technical aspects and electrical characteristics of wind and photovoltaic power plants, and on existing requirements from other utilities (both U.S. and European).

  1. The International Linear Collider Technical Design Report - Volume 3.II: Accelerator Baseline Design

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Adolphsen, Chris

    2013-06-26

    The International Linear Collider Technical Design Report (TDR) describes in four volumes the physics case and the design of a 500 GeV centre-of-mass energy linear electron-positron collider based on superconducting radio-frequency technology using Niobium cavities as the accelerating structures. The accelerator can be extended to 1 TeV and also run as a Higgs factory at around 250 GeV and on the Z0 pole. A comprehensive value estimate of the accelerator is give, together with associated uncertainties. It is shown that no significant technical issues remain to be solved. Once a site is selected and the necessary site-dependent engineering is carriedmore » out, construction can begin immediately. The TDR also gives baseline documentation for two high-performance detectors that can share the ILC luminosity by being moved into and out of the beam line in a "push-pull" configuration. These detectors, ILD and SiD, are described in detail. They form the basis for a world-class experimental programme that promises to increase significantly our understanding of the fundamental processes that govern the evolution of the Universe.« less

  2. 30 CFR 7.84 - Technical requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Underground Coal Mines § 7.84 Technical requirements. (a) Fuel injection adjustment. The fuel injection system of the engine shall be constructed so that the quantity of fuel injected can be controlled at a... design. (b) Maximum fuel-air ratio. At the maximum fuel-air ratio determined by § 7.87 of this part, the...

  3. 30 CFR 7.84 - Technical requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Underground Coal Mines § 7.84 Technical requirements. (a) Fuel injection adjustment. The fuel injection system of the engine shall be constructed so that the quantity of fuel injected can be controlled at a... design. (b) Maximum fuel-air ratio. At the maximum fuel-air ratio determined by § 7.87 of this part, the...

  4. 30 CFR 7.84 - Technical requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Underground Coal Mines § 7.84 Technical requirements. (a) Fuel injection adjustment. The fuel injection system of the engine shall be constructed so that the quantity of fuel injected can be controlled at a... design. (b) Maximum fuel-air ratio. At the maximum fuel-air ratio determined by § 7.87 of this part, the...

  5. 30 CFR 7.84 - Technical requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Underground Coal Mines § 7.84 Technical requirements. (a) Fuel injection adjustment. The fuel injection system of the engine shall be constructed so that the quantity of fuel injected can be controlled at a... design. (b) Maximum fuel-air ratio. At the maximum fuel-air ratio determined by § 7.87 of this part, the...

  6. 30 CFR 7.84 - Technical requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Underground Coal Mines § 7.84 Technical requirements. (a) Fuel injection adjustment. The fuel injection system of the engine shall be constructed so that the quantity of fuel injected can be controlled at a... design. (b) Maximum fuel-air ratio. At the maximum fuel-air ratio determined by § 7.87 of this part, the...

  7. 44 CFR 65.3 - Requirement to submit new technical data.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... available, a community shall notify the Administrator of the changes by submitting technical or scientific... IDENTIFICATION AND MAPPING OF SPECIAL HAZARD AREAS § 65.3 Requirement to submit new technical data. A community's...

  8. 47 CFR 18.109 - General technical requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false General technical requirements. 18.109 Section 18.109 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL INDUSTRIAL, SCIENTIFIC, AND... designed and constructed in accordance with good engineering practice with sufficient shielding and...

  9. 47 CFR 18.109 - General technical requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false General technical requirements. 18.109 Section 18.109 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL INDUSTRIAL, SCIENTIFIC, AND... designed and constructed in accordance with good engineering practice with sufficient shielding and...

  10. 47 CFR 18.109 - General technical requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false General technical requirements. 18.109 Section 18.109 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL INDUSTRIAL, SCIENTIFIC, AND... designed and constructed in accordance with good engineering practice with sufficient shielding and...

  11. 47 CFR 18.109 - General technical requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 1 2013-10-01 2013-10-01 false General technical requirements. 18.109 Section 18.109 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL INDUSTRIAL, SCIENTIFIC, AND... designed and constructed in accordance with good engineering practice with sufficient shielding and...

  12. 47 CFR 18.109 - General technical requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 1 2014-10-01 2014-10-01 false General technical requirements. 18.109 Section 18.109 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL INDUSTRIAL, SCIENTIFIC, AND... designed and constructed in accordance with good engineering practice with sufficient shielding and...

  13. Functions and requirements document for interim store solidified high-level and transuranic waste

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith-Fewell, M.A., Westinghouse Hanford

    1996-05-17

    The functions, requirements, interfaces, and architectures contained within the Functions and Requirements (F{ampersand}R) Document are based on the information currently contained within the TWRS Functions and Requirements database. The database also documents the set of technically defensible functions and requirements associated with the solidified waste interim storage mission.The F{ampersand}R Document provides a snapshot in time of the technical baseline for the project. The F{ampersand}R document is the product of functional analysis, requirements allocation and architectural structure definition. The technical baseline described in this document is traceable to the TWRS function 4.2.4.1, Interim Store Solidified Waste, and its related requirements, architecture,more » and interfaces.« less

  14. Technical Basis for PNNL Beryllium Inventory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, Michelle Lynn

    2014-07-09

    The Department of Energy (DOE) issued Title 10 of the Code of Federal Regulations Part 850, “Chronic Beryllium Disease Prevention Program” (the Beryllium Rule) in 1999 and required full compliance by no later than January 7, 2002. The Beryllium Rule requires the development of a baseline beryllium inventory of the locations of beryllium operations and other locations of potential beryllium contamination at DOE facilities. The baseline beryllium inventory is also required to identify workers exposed or potentially exposed to beryllium at those locations. Prior to DOE issuing 10 CFR 850, Pacific Northwest Nuclear Laboratory (PNNL) had documented the beryllium characterizationmore » and worker exposure potential for multiple facilities in compliance with DOE’s 1997 Notice 440.1, “Interim Chronic Beryllium Disease.” After DOE’s issuance of 10 CFR 850, PNNL developed an implementation plan to be compliant by 2002. In 2014, an internal self-assessment (ITS #E-00748) of PNNL’s Chronic Beryllium Disease Prevention Program (CBDPP) identified several deficiencies. One deficiency is that the technical basis for establishing the baseline beryllium inventory when the Beryllium Rule was implemented was either not documented or not retrievable. In addition, the beryllium inventory itself had not been adequately documented and maintained since PNNL established its own CBDPP, separate from Hanford Site’s program. This document reconstructs PNNL’s baseline beryllium inventory as it would have existed when it achieved compliance with the Beryllium Rule in 2001 and provides the technical basis for the baseline beryllium inventory.« less

  15. 38 CFR 61.52 - Threshold requirements for technical assistance grant applications.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2011-07-01 2011-07-01 false Threshold requirements for technical assistance grant applications. 61.52 Section 61.52 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS (CONTINUED) VA HOMELESS PROVIDERS GRANT AND PER DIEM PROGRAM § 61.52 Threshold requirements for technical assistanc...

  16. 47 CFR 15.611 - General technical requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false General technical requirements. 15.611 Section 15.611 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL RADIO FREQUENCY DEVICES Access... shut-off procedure, by the use of a non-volatile memory, or some other method, to immediately restore...

  17. National INFOSEC technical baseline: multi-level secure systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Anderson, J P

    1998-09-28

    The purpose of this report is to provide a baseline description of the state of multilevel processor/processing to the INFOSEC Research Council and at their discretion to the R&D community at large. From the information in the report, it is hoped that the members of the IRC will be aware of gaps in MLS research. A primary purpose is to bring IRC and the research community members up to date on what is happening in the MLS arena. The review will attempt to cover what MLS products are still available, and to identify companies who still offer MLS products. Wemore » have also attempted to identify requirements for MLS by interviewing senior officers of the Intelligence community as well as those elements of DoD and DOE who are or may be interested in procuring MLS products for various applications. The balance of the report consists of the following sections; a background review of the highlights of the developments of MLS, a quick summary of where we are today in terms of products, installations, and companies who are still in the business of supplying MLS systems [or who are developing MLS system], the requirements as expressed by senior members of the Intelligence community and DoD and DOE, issues and unmet R&D challenges surrounding MLS, and finally a set of recommended research topics.« less

  18. Civilian Radioactive Waste Management System Requirements Document

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    C.A. Kouts

    2006-05-10

    The CRD addresses the requirements of Department of Energy (DOE) Order 413.3-Change 1, ''Program and Project Management for the Acquisition of Capital Assets'', by providing the Secretarial Acquisition Executive (Level 0) scope baseline and the Program-level (Level 1) technical baseline. The Secretarial Acquisition Executive approves the Office of Civilian Radioactive Waste Management's (OCRWM) critical decisions and changes against the Level 0 baseline; and in turn, the OCRWM Director approves all changes against the Level 1 baseline. This baseline establishes the top-level technical scope of the CRMWS and its three system elements, as described in section 1.3.2. The organizations responsible formore » design, development, and operation of system elements described in this document must therefore prepare subordinate project-level documents that are consistent with the CRD. Changes to requirements will be managed in accordance with established change and configuration control procedures. The CRD establishes requirements for the design, development, and operation of the CRWMS. It specifically addresses the top-level governing laws and regulations (e.g., ''Nuclear Waste Policy Act'' (NWPA), 10 Code of Federal Regulations (CFR) Part 63, 10 CFR Part 71, etc.) along with specific policy, performance requirements, interface requirements, and system architecture. The CRD shall be used as a vehicle to incorporate specific changes in technical scope or performance requirements that may have significant program implications. Such may include changes to the program mission, changes to operational capability, and high visibility stakeholder issues. The CRD uses a systems approach to: (1) identify key functions that the CRWMS must perform, (2) allocate top-level requirements derived from statutory, regulatory, and programmatic sources, and (3) define the basic elements of the system architecture and operational concept. Project-level documents address CRD requirements by

  19. 38 CFR 61.52 - Technical assistance grant application packages-threshold requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2014-07-01 2014-07-01 false Technical assistance grant application packages-threshold requirements. 61.52 Section 61.52 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS (CONTINUED) VA HOMELESS PROVIDERS GRANT AND PER DIEM PROGRAM Technical Assistance Grants § 61.52 Technical...

  20. 38 CFR 61.52 - Technical assistance grant application packages-threshold requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2013-07-01 2013-07-01 false Technical assistance grant application packages-threshold requirements. 61.52 Section 61.52 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS (CONTINUED) VA HOMELESS PROVIDERS GRANT AND PER DIEM PROGRAM Technical Assistance Grants § 61.52 Technical...

  1. 47 CFR 15.510 - Technical requirements for through D-wall imaging systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Technical requirements for through D-wall imaging systems. 15.510 Section 15.510 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL RADIO FREQUENCY DEVICES Ultra-Wideband Operation § 15.510 Technical requirements for through D-wall imaging...

  2. 44 CFR 65.3 - Requirement to submit new technical data.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... technical data. 65.3 Section 65.3 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY... IDENTIFICATION AND MAPPING OF SPECIAL HAZARD AREAS § 65.3 Requirement to submit new technical data. A community's base flood elevations may increase or decrease resulting from physical changes affecting flooding...

  3. Technical skills requirement of Indonesian construction labors to work in Malaysia

    NASA Astrophysics Data System (ADS)

    Adi, Henny Pratiwi

    2017-03-01

    Labors skills is an important part of construction projects implementation. Suitability between the skills possessed by labors with the skills needed by user is required to increase employment opportunities. Malaysia is a country that using construction labors from Indonesia. This study aims to get the kind of technical skills required by users of Indonesian constructian labors in Malaysia and also the importance level of technical skills. Data collecting in this research was conducted through interviews and questionnaires on contractors in Malaysia. The next stage was determine the importance level of technical skills in work field of carpenter, bricklayer, plumber and painters. The importance level of technical skills analyzed using the Relative Importance Index (RII). The results showed that mastering the operation of both instruments either manually or electrically is the most importance in the technical skills. Therefore, an understanding of the types of equipment for work field and the manner of operation is need to had by Indonesian construction labors who will work in Malaysia.

  4. Maintaining technical excellence requires a national plan

    NASA Technical Reports Server (NTRS)

    Davidson, T. F.

    1991-01-01

    To meet the challenge of technical excellence, AIA established a rocket propulsion committee to develop the National Rocket Propulsion Strategic Plan. Developing such a plan required a broad spectrum of experience and disciplines. The Strategic Plan team needed the participation of industry, government, and academia. The plan provides, if followed, a means for the U.S. to maintain technical excellence and world leadership in rocket propulsion. To implement the National Rocket Propulsion Strategic Plan is to invest in the social, economic, and technological futures of America. The plan lays the basis for upgrading existing propulsion systems and a firm base for future full scale development, production, and operation of rocket propulsion systems for space, defense, and commercial applications.

  5. War-gaming application for future space systems acquisition part 1: program and technical baseline war-gaming modeling and simulation approaches

    NASA Astrophysics Data System (ADS)

    Nguyen, Tien M.; Guillen, Andy T.

    2017-05-01

    This paper describes static Bayesian game models with "Pure" and "Mixed" games for the development of an optimum Program and Technical Baseline (PTB) solution for affordable acquisition of future space systems. The paper discusses System Engineering (SE) frameworks and analytical and simulation modeling approaches for developing the optimum PTB solutions from both the government and contractor perspectives.

  6. 9 CFR 351.16 - Certificate required for shipments of technical animal fat.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... technical animal fat. 351.16 Section 351.16 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE... AND VOLUNTARY INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.16 Certificate required for shipments of...

  7. 9 CFR 351.16 - Certificate required for shipments of technical animal fat.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... technical animal fat. 351.16 Section 351.16 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE... AND VOLUNTARY INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.16 Certificate required for shipments of...

  8. 9 CFR 351.16 - Certificate required for shipments of technical animal fat.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... technical animal fat. 351.16 Section 351.16 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE... AND VOLUNTARY INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.16 Certificate required for shipments of...

  9. 9 CFR 351.16 - Certificate required for shipments of technical animal fat.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... technical animal fat. 351.16 Section 351.16 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE... AND VOLUNTARY INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.16 Certificate required for shipments of...

  10. 9 CFR 351.16 - Certificate required for shipments of technical animal fat.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... technical animal fat. 351.16 Section 351.16 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE... AND VOLUNTARY INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.16 Certificate required for shipments of...

  11. 75 FR 6683 - Notice of Proposed Information Collection: Comment Request; Technical Processing Requirements for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-10

    ... Information Collection: Comment Request; Technical Processing Requirements for Multifamily Project Mortgage... information: Title of Proposal: Technical Processing Requirements for Multifamily Project Mortgage Insurance... information collection requirement described below will be submitted to the Office of Management and Budget...

  12. 75 FR 18505 - International Cooperation on Harmonisation of Technical Requirements for Registration of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-12

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2010-D-0165] International Cooperation on Harmonisation of Technical Requirements for Registration of Veterinary Medicinal... veterinary use by the International Cooperation on Harmonisation of Technical Requirements for Registration...

  13. Summary Report for the Technical Interchange Meeting on Development of Baseline Material Properties and Design Guidelines for In-Space Manufacturing Activities

    NASA Technical Reports Server (NTRS)

    Prater, T. J.; Bean, Q. A.; Werkheiser, N. J.; Johnston, M. M.; Ordonez, E. A.; Ledbetter, F. E.; Risdon, D. L.; Stockman, T. J.; Sandridge, S. K. R.; Nelson, G. M.

    2016-01-01

    NASA Marshall Space Flight Center (MSFC) and the Agency as a whole are currently engaged in a number of in-space manufacturing (ISM) activities that have the potential to reduce launch costs, enhance crew safety, and provide the capabilities needed to undertake long-duration spaceflight. The recent 3D Printing in Zero-G experiment conducted on board the International Space Station (ISS) demonstrated that parts of acrylonitrile butadiene styrene (ABS) plastic can be manufactured in microgravity using fused deposition modeling (FDM). This project represents the beginning of the development of a capability that is critical to future NASA missions. Current and future ISM activities will require the development of baseline material properties to facilitate design, analysis, and certification of materials manufactured using in-space techniques. The purpose of this technical interchange meeting (TIM) was to bring together MSFC practitioners and experts in materials characterization and development of baseline material properties for emerging technologies to advise the ISM team as we progress toward the development of material design values, standards, and acceptance criteria for materials manufactured in space. The overall objective of the TIM was to leverage MSFC's shared experiences and collective knowledge in advanced manufacturing and materials development to construct a path forward for the establishment of baseline material properties, standards development, and certification activities related to ISM. Participants were asked to help identify research and development activities that will (1) accelerate acceptance and adoption of ISM techniques among the aerospace design community; (2) benefit future NASA programs, commercial technology developments, and national needs; and (3) provide opportunities and avenues for further collaboration.

  14. 19 CFR 115.30 - Technical requirements for containers by design type.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... SECURITY; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS CONVENTIONS Procedures for Approval of Containers by Design Type § 115.30 Technical... 19 Customs Duties 1 2011-04-01 2011-04-01 false Technical requirements for containers by design...

  15. 19 CFR 115.30 - Technical requirements for containers by design type.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... SECURITY; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS CONVENTIONS Procedures for Approval of Containers by Design Type § 115.30 Technical... 19 Customs Duties 1 2012-04-01 2012-04-01 false Technical requirements for containers by design...

  16. 19 CFR 115.30 - Technical requirements for containers by design type.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... SECURITY; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS CONVENTIONS Procedures for Approval of Containers by Design Type § 115.30 Technical... 19 Customs Duties 1 2014-04-01 2014-04-01 false Technical requirements for containers by design...

  17. 19 CFR 115.30 - Technical requirements for containers by design type.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... SECURITY; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS CONVENTIONS Procedures for Approval of Containers by Design Type § 115.30 Technical... 19 Customs Duties 1 2010-04-01 2010-04-01 false Technical requirements for containers by design...

  18. 19 CFR 115.30 - Technical requirements for containers by design type.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... SECURITY; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS CONVENTIONS Procedures for Approval of Containers by Design Type § 115.30 Technical... 19 Customs Duties 1 2013-04-01 2013-04-01 false Technical requirements for containers by design...

  19. 19 CFR 115.40 - Technical requirements for containers.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS... containers. A container that is submitted for inspection for approval after manufacture, must comply with the... 19 Customs Duties 1 2010-04-01 2010-04-01 false Technical requirements for containers. 115.40...

  20. 19 CFR 115.40 - Technical requirements for containers.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ...; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS... containers. A container that is submitted for inspection for approval after manufacture, must comply with the... 19 Customs Duties 1 2012-04-01 2012-04-01 false Technical requirements for containers. 115.40...

  1. 19 CFR 115.40 - Technical requirements for containers.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ...; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS... containers. A container that is submitted for inspection for approval after manufacture, must comply with the... 19 Customs Duties 1 2011-04-01 2011-04-01 false Technical requirements for containers. 115.40...

  2. 19 CFR 115.40 - Technical requirements for containers.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ...; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS... containers. A container that is submitted for inspection for approval after manufacture, must comply with the... 19 Customs Duties 1 2013-04-01 2013-04-01 false Technical requirements for containers. 115.40...

  3. 19 CFR 115.40 - Technical requirements for containers.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ...; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS... containers. A container that is submitted for inspection for approval after manufacture, must comply with the... 19 Customs Duties 1 2014-04-01 2014-04-01 false Technical requirements for containers. 115.40...

  4. Baseline requirements can hinder trades in water quality trading programs: Evidence from the Conestoga watershed.

    PubMed

    Ghosh, Gaurav; Ribaudo, Marc; Shortle, James

    2011-08-01

    The U.S. Environmental Protection Agency (USEPA) and the U.S. Department of Agriculture (USDA) are promoting point/nonpoint trading as a way of reducing the costs of meeting water quality goals. Farms can create offsets by implementing management practices such as conservation tillage, nutrient management and buffer strips. To be eligible to sell offsets or credits, farmers must first comply with baseline requirements. USEPA guidance recommends that the baseline for nonpoint sources be management practices that are consistent with the water quality goal. A farmer would not be able to create offsets until the minimum practice standards are met. An alternative baseline is those practices being implemented at the time the trading program starts, or when the farmer enters the program. The selection of the baseline affects the efficiency and equity of the trading program. It has major implications for which farmers benefit from trading, the cost of nonpoint source offsets, and ultimately the number of offsets that nonpoint sources can sell to regulated point sources. We use a simple model of the average profit-maximizing dairy farmer operating in the Conestoga watershed in Pennsylvania to evaluate the implications of baseline requirements on the cost and quantity of offsets that can be produced for sale in a water quality trading market, and which farmers benefit most from trading. Published by Elsevier Ltd.

  5. 78 FR 64146 - 30-Day Notice of Proposed Information Collection: Technical Processing Requirements for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-25

    ... Information Collection: Technical Processing Requirements for Multifamily Project Mortgage Insurance AGENCY: Office of the Chief Information Officer, HUD. ACTION: Notice. SUMMARY: HUD has submitted the proposed... Information Collection Title of Information Collection: Technical Processing Requirements for Multifamily...

  6. 78 FR 65695 - 30-Day Notice of Proposed Information Collection: Technical Processing Requirements for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-01

    ... Information Collection: Technical Processing Requirements for Multifamily Project Mortgage Insurance AGENCY: Office of the Chief Information Officer, HUD. ACTION: Correction, notice. SUMMARY: On October 25, 2013 at... Collection Title of Information Collection: Technical Processing Requirements for Multifamily Project...

  7. Solar central electric power generation - A baseline design

    NASA Technical Reports Server (NTRS)

    Powell, J. C.

    1976-01-01

    The paper presents the conceptual technical baseline design of a solar electric power plant using the central receiver concept, and derives credible cost estimates from the baseline design. The major components of the plant - heliostats, tower, receiver, tower piping, and thermal storage - are discussed in terms of technical and cost information. The assumed peak plant output is 215 MW(e), over 4000 daylight hours. The contribution of total capital investment to energy cost is estimated to be about 55 mills per kwh in mid-1974 dollars.

  8. Inertial subsystem functional and design requirements for the orbiter (Phase B extension baseline)

    NASA Technical Reports Server (NTRS)

    Flanders, J. H.; Green, J. P., Jr.

    1972-01-01

    The design requirements use the Phase B extension baseline system definition. This means that a GNC computer is specified for all command control functions instead of a central computer communicating with the ISS through a databus. Forced air cooling is used instead of cold plate cooling.

  9. 47 CFR 80.231 - Technical Requirements for Class B Automatic Identification System (AIS) equipment.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Identification System (AIS) equipment. 80.231 Section 80.231 Telecommunication FEDERAL COMMUNICATIONS COMMISSION... § 80.231 Technical Requirements for Class B Automatic Identification System (AIS) equipment. (a) Class B Automatic Identification System (AIS) equipment must meet the technical requirements of IEC 62287...

  10. 47 CFR 80.231 - Technical Requirements for Class B Automatic Identification System (AIS) equipment.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Identification System (AIS) equipment. 80.231 Section 80.231 Telecommunication FEDERAL COMMUNICATIONS COMMISSION... § 80.231 Technical Requirements for Class B Automatic Identification System (AIS) equipment. (a) Class B Automatic Identification System (AIS) equipment must meet the technical requirements of IEC 62287...

  11. 47 CFR 80.231 - Technical Requirements for Class B Automatic Identification System (AIS) equipment.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Identification System (AIS) equipment. 80.231 Section 80.231 Telecommunication FEDERAL COMMUNICATIONS COMMISSION... § 80.231 Technical Requirements for Class B Automatic Identification System (AIS) equipment. (a) Class B Automatic Identification System (AIS) equipment must meet the technical requirements of IEC 62287...

  12. Tank waste remediation system functions and requirements document

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carpenter, K.E

    1996-10-03

    This is the Tank Waste Remediation System (TWRS) Functions and Requirements Document derived from the TWRS Technical Baseline. The document consists of several text sections that provide the purpose, scope, background information, and an explanation of how this document assists the application of Systems Engineering to the TWRS. The primary functions identified in the TWRS Functions and Requirements Document are identified in Figure 4.1 (Section 4.0) Currently, this document is part of the overall effort to develop the TWRS Functional Requirements Baseline, and contains the functions and requirements needed to properly define the top three TWRS function levels. TWRS Technicalmore » Baseline information (RDD-100 database) included in the appendices of the attached document contain the TWRS functions, requirements, and architecture necessary to define the TWRS Functional Requirements Baseline. Document organization and user directions are provided in the introductory text. This document will continue to be modified during the TWRS life-cycle.« less

  13. High School Graduation Minimum Competency Requirements. Final Technical Report.

    ERIC Educational Resources Information Center

    Austin Independent School District, TX. Office of Research and Evaluation.

    This technical report details the testing results and analyses supporting the evaluation findings related to the Austin (Texas) Independent School District (AISD) minimum competency graduation requirements. The graduation competency status of all AISD students in grades 8 to 12 are documented. The report provides additional information on the data…

  14. Geosynchronous platform definition study. Volume 4, Part 1: Traffic analysis and system requirements for the baseline traffic model

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The traffic analyses and system requirements data generated in the study resulted in the development of two traffic models; the baseline traffic model and the new traffic model. The baseline traffic model provides traceability between the numbers and types of geosynchronous missions considered in the study and the entire spectrum of missions foreseen in the total national space program. The information presented pertaining to the baseline traffic model includes: (1) definition of the baseline traffic model, including identification of specific geosynchronous missions and their payload delivery schedules through 1990; (2) Satellite location criteria, including the resulting distribution of the satellite population; (3) Geosynchronous orbit saturation analyses, including the effects of satellite physical proximity and potential electromagnetic interference; and (4) Platform system requirements analyses, including satellite and mission equipment descriptions, the options and limitations in grouping satellites, and on-orbit servicing criteria (both remotely controlled and man-attended).

  15. 77 FR 20406 - International Cooperation on Harmonisation of Technical Requirements for Registration of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-04

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2012-D-0288] International Cooperation on Harmonisation of Technical Requirements for Registration of Veterinary Medicinal... been developed for veterinary use by the International Cooperation on Harmonisation of Technical...

  16. Relationship of Baseline Hemoglobin Level with Serum Ferritin, Postphlebotomy Hemoglobin Changes, and Phlebotomy Requirements among HFE C282Y Homozygotes

    PubMed Central

    Mousavi, Seyed Ali; Mahmood, Faiza; Aandahl, Astrid; Knutsen, Teresa Risopatron; Llohn, Abid Hussain

    2015-01-01

    Objectives. We aimed to examine whether baseline hemoglobin levels in C282Y-homozygous patients are related to the degree of serum ferritin (SF) elevation and whether patients with different baseline hemoglobin have different phlebotomy requirements. Methods. A total of 196 patients (124 males and 72 females) who had undergone therapeutic phlebotomy and had SF and both pre- and posttreatment hemoglobin values were included in the study. Results. Bivariate correlation analysis suggested that baseline SF explains approximately 6 to 7% of the variation in baseline hemoglobin. The results also showed that males who had higher (≥150 g/L) baseline hemoglobin levels had a significantly greater reduction in their posttreatment hemoglobin despite requiring fewer phlebotomies to achieve iron depletion than those who had lower (<150 g/L) baseline hemoglobin, regardless of whether baseline SF was below or above 1000 µg/L. There were no significant differences between hemoglobin subgroups regarding baseline and treatment characteristics, except for transferrin saturation between male subgroups with SF above 1000 µg/L. Similar differences were observed when females with higher (≥138 g/L) baseline hemoglobin were compared with those with lower (<138 g/L) baseline hemoglobin. Conclusion. Dividing C282Y-homozygous patients into just two subgroups according to the degree of baseline SF elevation may obscure important subgroup variations. PMID:26380265

  17. 47 CFR 25.214 - Technical requirements for space stations in the Satellite Digital Audio Radio Service and...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 2 2014-10-01 2014-10-01 false Technical requirements for space stations in the Satellite Digital Audio Radio Service and associated terrestrial repeaters. 25.214 Section 25.214... Technical Standards § 25.214 Technical requirements for space stations in the Satellite Digital Audio Radio...

  18. 47 CFR 25.214 - Technical requirements for space stations in the satellite digital audio radio service and...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 2 2012-10-01 2012-10-01 false Technical requirements for space stations in the satellite digital audio radio service and associated terrestrial repeaters. 25.214 Section 25.214... Technical Standards § 25.214 Technical requirements for space stations in the satellite digital audio radio...

  19. 47 CFR 25.214 - Technical requirements for space stations in the satellite digital audio radio service and...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 2 2011-10-01 2011-10-01 false Technical requirements for space stations in the satellite digital audio radio service and associated terrestrial repeaters. 25.214 Section 25.214... Technical Standards § 25.214 Technical requirements for space stations in the satellite digital audio radio...

  20. 47 CFR 25.214 - Technical requirements for space stations in the Satellite Digital Audio Radio Service and...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 2 2013-10-01 2013-10-01 false Technical requirements for space stations in the Satellite Digital Audio Radio Service and associated terrestrial repeaters. 25.214 Section 25.214... Technical Standards § 25.214 Technical requirements for space stations in the Satellite Digital Audio Radio...

  1. 47 CFR 25.214 - Technical requirements for space stations in the satellite digital audio radio service and...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Technical requirements for space stations in the satellite digital audio radio service and associated terrestrial repeaters. 25.214 Section 25.214... Technical Standards § 25.214 Technical requirements for space stations in the satellite digital audio radio...

  2. 47 CFR 25.215 - Technical requirements for space stations in the Direct Broadcast Satellite Service.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 2 2012-10-01 2012-10-01 false Technical requirements for space stations in... Technical requirements for space stations in the Direct Broadcast Satellite Service. In addition to § 25.148(f), space station antennas operating in the Direct Broadcast Satellite Service must be designed to...

  3. 47 CFR 25.215 - Technical requirements for space stations in the Direct Broadcast Satellite Service.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 2 2013-10-01 2013-10-01 false Technical requirements for space stations in... Technical requirements for space stations in the Direct Broadcast Satellite Service. In addition to § 25.148(f), space station antennas operating in the Direct Broadcast Satellite Service must be designed to...

  4. 47 CFR 25.215 - Technical requirements for space stations in the Direct Broadcast Satellite Service.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 2 2011-10-01 2011-10-01 false Technical requirements for space stations in... Technical requirements for space stations in the Direct Broadcast Satellite Service. In addition to § 25.148(f), space station antennas operating in the Direct Broadcast Satellite Service must be designed to...

  5. 47 CFR 25.215 - Technical requirements for space stations in the Direct Broadcast Satellite Service.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Technical requirements for space stations in... Technical requirements for space stations in the Direct Broadcast Satellite Service. In addition to § 25.148(f), space station antennas operating in the Direct Broadcast Satellite Service must be designed to...

  6. 22 CFR 124.8 - Clauses required both in manufacturing license agreements and technical assistance agreements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... agreements and technical assistance agreements. 124.8 Section 124.8 Foreign Relations DEPARTMENT OF STATE... Clauses required both in manufacturing license agreements and technical assistance agreements. The following statements must be included both in manufacturing license agreements and in technical assistance...

  7. 48 CFR 1034.202 - Integrated Baseline Reviews.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... which the management process provides effective and integrated technical/schedule/cost planning and... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Integrated Baseline... SPECIAL CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION Earned Value Management System 1034.202...

  8. 48 CFR 34.202 - Integrated Baseline Reviews.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... inherent risks in offerors'/contractors' performance plans and the underlying management control systems...) The degree to which the management process provides effective and integrated technical/schedule/cost... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Integrated Baseline...

  9. English Skills for Engineers Required by the English Technical Writing Test

    NASA Astrophysics Data System (ADS)

    Kyouno, Noboru

    Japanese English education has focused mainly on teaching passive skills such as reading and listening, whereas actual business activities in society require active skills such as writing and speaking in addition to the passive skills. This educational situation is estimated to be a reason Japanese engineers are less confident in writing and speaking than in reading and listening. This paper focuses on details of the English Technical Writing Test provided by the Japan Society of Technical Communication and emphasizes the importance of the active skills, mainly focusing on what skills should be taught in the future and how to develop these skills. This paper also stresses the necessity of learning rhetoric-related skills, concept of information words, as well as paragraph reading and writing skills based on the concept of the 3Cs (Correct, Clear, and Concise) as a means to develop technical writing skills for engineers.

  10. 76 FR 35103 - Training and Qualification Requirements for Check Airmen and Flight Instructors; Technical Amendment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-16

    ... which initial and transition flight training must include an in-flight element. Technical Amendment This.... 28471; Amendment Nos. 121-355 and 135-125] RIN 2120-AF08 Training and Qualification Requirements for Check Airmen and Flight Instructors; Technical Amendment AGENCY: Federal Aviation Administration (FAA...

  11. 48 CFR 3419.870 - Acquisition of technical requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... competition to submit written technical proposals. Otherwise, ED holds oral discussions with the participating... participating in a limited technical competition based on the written technical proposals or oral discussions... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Acquisition of technical...

  12. 47 CFR 80.271 - Technical requirements for portable survival craft radiotelephone transceivers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... craft radiotelephone transceivers. 80.271 Section 80.271 Telecommunication FEDERAL COMMUNICATIONS... Authorization for Compulsory Ships § 80.271 Technical requirements for portable survival craft radiotelephone transceivers. (a) Portable survival craft radiotelephone transceivers must comply with the following: (1) The...

  13. Technical Communication Internship Requirements in the Academic Economy: How We Compare among Ourselves and across Other Applied Fields

    ERIC Educational Resources Information Center

    Savage, Gerald J.; Seible, Marcea K.

    2010-01-01

    This article reports a study of internship requirements in technical communication programs compared with three established professions and one emerging profession that have certification or licensing requirements for practitioners. The study addresses three questions about technical communication internship programs: 1) Are internships offered as…

  14. 10 CFR 35.647 - Additional technical requirements for mobile remote afterloader units.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Additional technical requirements for mobile remote afterloader units. 35.647 Section 35.647 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Photon Emitting Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery...

  15. 10 CFR 35.647 - Additional technical requirements for mobile remote afterloader units.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Additional technical requirements for mobile remote afterloader units. 35.647 Section 35.647 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Photon Emitting Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery...

  16. 10 CFR 35.647 - Additional technical requirements for mobile remote afterloader units.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Additional technical requirements for mobile remote afterloader units. 35.647 Section 35.647 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Photon Emitting Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery...

  17. 10 CFR 35.647 - Additional technical requirements for mobile remote afterloader units.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Additional technical requirements for mobile remote afterloader units. 35.647 Section 35.647 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Photon Emitting Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery...

  18. Technical writing versus technical writing

    NASA Technical Reports Server (NTRS)

    Dillingham, J. W.

    1981-01-01

    Two terms, two job categories, 'technical writer' and 'technical author' are discussed in terms of industrial and business requirements and standards. A distinction between 'technical writing' and technical 'writing' is made. The term 'technical editor' is also considered. Problems inherent in the design of programs to prepare and train students for these jobs are discussed. A closer alliance between industry and academia is suggested as a means of preparing students with competent technical communication skills (especially writing and editing skills) and good technical skills.

  19. Baseline requirements for detecting biosignatures with the HabEx and LUVOIR mission concepts

    NASA Astrophysics Data System (ADS)

    Wang, Ji; Mawet, Dimitri; Ruane, Garreth; Delorme, Jacques-Robert; Klimovich, Nikita; Hu, Renyu

    2017-09-01

    A milestone in understanding life in the universe is the detection of biosignature gases in the atmospheres of habitable exoplanets. Future mission concepts under study by the 2020 decadal survey, e.g., HabEx and LUVOIR, have the potential of achieving this goal. We investigate the baseline requirements for detecting four molecular species, H2O, O2, CH4, and CO2. These molecules are highly relevant to habitability and life activity on Earth and other planets. Through numerical simulations, we find the minimum requirement for spectral resolution (R) and starlight suppression level (C) for a given exposure time. We consider scenarios in which different molecules are detected. For example, R = 6400 (400) and C = 5 × 10-10 (2 × 10-9 ) are required for HabEx (LUVOIR) to detect O2 and H2O for an exposure time of 400 hours for an Earth analog around a solar-type star at a distance of 5 pc. The full results are given in Table 2. The impact of exo-zodiacal contamination and thermal background is also discussed

  20. 19 CFR 115.65 - Technical requirements for road vehicles by design type.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 19 Customs Duties 1 2012-04-01 2012-04-01 false Technical requirements for road vehicles by design type. 115.65 Section 115.65 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO...

  1. 19 CFR 115.65 - Technical requirements for road vehicles by design type.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 19 Customs Duties 1 2011-04-01 2011-04-01 false Technical requirements for road vehicles by design type. 115.65 Section 115.65 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO...

  2. 19 CFR 115.65 - Technical requirements for road vehicles by design type.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 19 Customs Duties 1 2013-04-01 2013-04-01 false Technical requirements for road vehicles by design type. 115.65 Section 115.65 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO...

  3. 19 CFR 115.65 - Technical requirements for road vehicles by design type.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 19 Customs Duties 1 2014-04-01 2014-04-01 false Technical requirements for road vehicles by design type. 115.65 Section 115.65 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO...

  4. 19 CFR 115.65 - Technical requirements for road vehicles by design type.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 19 Customs Duties 1 2010-04-01 2010-04-01 false Technical requirements for road vehicles by design type. 115.65 Section 115.65 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO...

  5. Emergency Response Capability Baseline Needs Assessment - Requirements Document

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sharry, John A.

    This document was prepared by John A. Sharry, LLNL Fire Marshal and LLNL Division Leader for Fire Protection and reviewed by LLNL Emergency Management Department Head James Colson. The document follows and expands upon the format and contents of the DOE Model Fire Protection Baseline Capabilities Assessment document contained on the DOE Fire Protection Web Site, but only addresses emergency response.

  6. Analysis of baseline gene expression levels from ...

    EPA Pesticide Factsheets

    The use of gene expression profiling to predict chemical mode of action would be enhanced by better characterization of variance due to individual, environmental, and technical factors. Meta-analysis of microarray data from untreated or vehicle-treated animals within the control arm of toxicogenomics studies has yielded useful information on baseline fluctuations in gene expression. A dataset of control animal microarray expression data was assembled by a working group of the Health and Environmental Sciences Institute's Technical Committee on the Application of Genomics in Mechanism Based Risk Assessment in order to provide a public resource for assessments of variability in baseline gene expression. Data from over 500 Affymetrix microarrays from control rat liver and kidney were collected from 16 different institutions. Thirty-five biological and technical factors were obtained for each animal, describing a wide range of study characteristics, and a subset were evaluated in detail for their contribution to total variability using multivariate statistical and graphical techniques. The study factors that emerged as key sources of variability included gender, organ section, strain, and fasting state. These and other study factors were identified as key descriptors that should be included in the minimal information about a toxicogenomics study needed for interpretation of results by an independent source. Genes that are the most and least variable, gender-selectiv

  7. Ultra Pure Water Cleaning Baseline Study on NASA JSC Astromaterial Curation Gloveboxes

    NASA Technical Reports Server (NTRS)

    Calaway, Michael J.; Burkett, P. J.; Allton, J. H.; Allen, C. C.

    2013-01-01

    Future sample return missions will require strict protocols and procedures for reducing inorganic and organic contamination in isolation containment systems. In 2012, a baseline study was orchestrated to establish the current state of organic cleanliness in gloveboxes used by NASA JSC astromaterials curation labs [1, 2]. As part of this in-depth organic study, the current curatorial technical support procedure (TSP) 23 was used for cleaning the gloveboxes with ultra pure water (UPW) [3-5]. Particle counts and identification were obtained that could be used as a benchmark for future mission designs that require glovebox decontamination. The UPW baseline study demonstrates that TSP 23 works well for gloveboxes that have been thoroughly degreased. However, TSP 23 could be augmented to provide even better glovebox decontamination. JSC 03243 could be used as a starting point for further investigating optimal cleaning techniques and procedures. DuPont Vertrel XF or other chemical substitutes to replace Freon- 113, mechanical scrubbing, and newer technology could be used to enhance glovebox cleanliness in addition to high purity UPW final rinsing. Future sample return missions will significantly benefit from further cleaning studies to reduce inorganic and organic contamination.

  8. 76 FR 57060 - International Cooperation on Harmonisation of Technical Requirements for Registration of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-15

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2011-D-0588] International Cooperation on Harmonisation of Technical Requirements for Registration of Veterinary Medicinal Products; Draft Guidance for Industry on Pharmacovigilance of Veterinary Medicinal Products: Electronic...

  9. 50 CFR 91.13 - Technical requirements for design and submission of entry.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 50 Wildlife and Fisheries 9 2014-10-01 2014-10-01 false Technical requirements for design and submission of entry. 91.13 Section 91.13 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE INTERIOR (CONTINUED) MISCELLANEOUS PROVISIONS MIGRATORY BIRD HUNTING AND CONSERVATION STAMP CONTEST Procedures for Entering the...

  10. 50 CFR 91.13 - Technical requirements for design and submission of entry.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 50 Wildlife and Fisheries 9 2012-10-01 2012-10-01 false Technical requirements for design and submission of entry. 91.13 Section 91.13 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE INTERIOR (CONTINUED) MISCELLANEOUS PROVISIONS MIGRATORY BIRD HUNTING AND CONSERVATION STAMP CONTEST Procedures for Entering the...

  11. 76 FR 57058 - International Cooperation on Harmonisation of Technical Requirements for Registration of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-15

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2010-D-0165] International Cooperation on Harmonisation of Technical Requirements for Registration of Veterinary Medicinal Products; Guidance for Industry on Studies To Evaluate the Metabolism and Residue Kinetics of Veterinary...

  12. Wilder-Naifeh Technical Skills Grant Program Report: A Baseline Evaluation

    ERIC Educational Resources Information Center

    Tennessee Higher Education Commission, 2010

    2010-01-01

    The Wilder-Naifeh Technical Skills Grant, introduced in Winter 2004, grants awards of up to $2,000 to students who attend one of the 27 Tennessee Technology Centers. Since the inception of this program, approximately 50,000 students have received grants, and the state of Tennessee has spent roughly $47.5 million on the program over the last four…

  13. Technical Requirements Analysis and Control Systems (TRACS) Initial Operating Capability (IOC) documentation

    NASA Technical Reports Server (NTRS)

    Hammond, Dana P.

    1991-01-01

    The Technical Requirements Analysis and Control Systems (TRACS) software package is described. TRACS offers supplemental tools for the analysis, control, and interchange of project requirements. This package provides the fundamental capability to analyze and control requirements, serves a focal point for project requirements, and integrates a system that supports efficient and consistent operations. TRACS uses relational data base technology (ORACLE) in a stand alone or in a distributed environment that can be used to coordinate the activities required to support a project through its entire life cycle. TRACS uses a set of keyword and mouse driven screens (HyperCard) which imposes adherence through a controlled user interface. The user interface provides an interactive capability to interrogate the data base and to display or print project requirement information. TRACS has a limited report capability, but can be extended with PostScript conventions.

  14. 1988 Underground Storage Tanks; Technical Requirements; Final Rule and Underground Storage Tanks Containing Petroleum-Financial Responsibility Requirements and State Program Approval Objective; Final Rule

    EPA Pesticide Factsheets

    EPA's 1988 regulations concerning USTs are contained in 40 CFR Part 280, 40 CFR Part 281 and 40 CFR Parts 282.50-282.105 and divided into three sections: technical requirements, financial responsibility requirements, and state program approval objectives.

  15. INDOT Technical Training Plan : [Technical Summary

    DOT National Transportation Integrated Search

    2012-01-01

    A wide range of job classifications, increasing technical : performance expectations, licensing and certification requirements, : budget restrictions and frequent department : reorganization has made technical training of employees : more difficult, ...

  16. Analysis of the Parameters Required for Performance Monitoring and Assessment of Military Communications Systems by Military Technical Controller

    DTIC Science & Technology

    1975-12-01

    139 APPENDIX A* BASIC CONCEPT OF MILITARY TECHNICAL CONTROL.142 6 APIENDIX Es TEST EQUIPMENI REQUIRED FOR lEASURF.4ENr OF 1AF’AMETE RS...Control ( SATEC ) Automatic Facilities heport Army Automated Quality Monitoring Reporting System (AQMPS) Army Autcmated Technical Control-Semi (ATC-Semi...technical control then beco.. es equipment status monitoring. All the major equipment in a system wculd have internal sensors with properly selected parameters

  17. 77 FR 34784 - Removal of Six Month Line Check Requirement for Pilots Over Age 60; Technical Amendment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-12

    ...-0486; Amdt. No. 121-359] Removal of Six Month Line Check Requirement for Pilots Over Age 60; Technical... years of age that applied to air carriers engaged in part 121 operations. This technical amendment... December 13, 2007. This legislation raised the upper age limit for pilots in part 121 from age 60 to age 65...

  18. 47 CFR 80.275 - Technical Requirements for Class A Automatic Identification System (AIS) equipment.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Compulsory Ships § 80.275 Technical Requirements for Class A Automatic Identification System (AIS) equipment. (a) Prior to submitting a certification application for a Class A AIS device, the following... Identification System (AIS) equipment. 80.275 Section 80.275 Telecommunication FEDERAL COMMUNICATIONS COMMISSION...

  19. 47 CFR 80.275 - Technical Requirements for Class A Automatic Identification System (AIS) equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Compulsory Ships § 80.275 Technical Requirements for Class A Automatic Identification System (AIS) equipment. (a) Prior to submitting a certification application for a Class A AIS device, the following... Identification System (AIS) equipment. 80.275 Section 80.275 Telecommunication FEDERAL COMMUNICATIONS COMMISSION...

  20. 47 CFR 80.275 - Technical Requirements for Class A Automatic Identification System (AIS) equipment.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Compulsory Ships § 80.275 Technical Requirements for Class A Automatic Identification System (AIS) equipment. (a) Prior to submitting a certification application for a Class A AIS device, the following... Identification System (AIS) equipment. 80.275 Section 80.275 Telecommunication FEDERAL COMMUNICATIONS COMMISSION...

  1. 47 CFR 80.275 - Technical Requirements for Class A Automatic Identification System (AIS) equipment.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Compulsory Ships § 80.275 Technical Requirements for Class A Automatic Identification System (AIS) equipment. (a) Prior to submitting a certification application for a Class A AIS device, the following... Identification System (AIS) equipment. 80.275 Section 80.275 Telecommunication FEDERAL COMMUNICATIONS COMMISSION...

  2. Additive Manufacturing in Production: A Study Case Applying Technical Requirements

    NASA Astrophysics Data System (ADS)

    Ituarte, Iñigo Flores; Coatanea, Eric; Salmi, Mika; Tuomi, Jukka; Partanen, Jouni

    Additive manufacturing (AM) is expanding the manufacturing capabilities. However, quality of AM produced parts is dependent on a number of machine, geometry and process parameters. The variability of these parameters affects the manufacturing drastically and therefore standardized processes and harmonized methodologies need to be developed to characterize the technology for end use applications and enable the technology for manufacturing. This research proposes a composite methodology integrating Taguchi Design of Experiments, multi-objective optimization and statistical process control, to optimize the manufacturing process and fulfil multiple requirements imposed to an arbitrary geometry. The proposed methodology aims to characterize AM technology depending upon manufacturing process variables as well as to perform a comparative assessment of three AM technologies (Selective Laser Sintering, Laser Stereolithography and Polyjet). Results indicate that only one machine, laser-based Stereolithography, was feasible to fulfil simultaneously macro and micro level geometrical requirements but mechanical properties were not at required level. Future research will study a single AM system at the time to characterize AM machine technical capabilities and stimulate pre-normative initiatives of the technology for end use applications.

  3. Hydrogen monitoring requirements in the global technical regulation on hydrogen and fuel cell vehicles

    DOE PAGES

    Buttner, William; Rivkin, C.; Burgess, R.; ...

    2017-02-04

    Here, the United Nations Economic Commission for Europe Global Technical Regulation (GTR) Number 13 ( Global Technical Regulation on Hydrogen and Fuel Cell Vehicles) is the defining document regulating safety requirements in hydrogen vehicles, and in particular, fuel cell electric vehicles (FCEVs). GTR Number 13 has been formally adopted and will serve as the basis for the national regulatory standards for FCEV safety in North America (led by the United States), Japan, Korea, and the European Union. The GTR defines safety requirements for these vehicles, including specifications on the allowable hydrogen levels in vehicle enclosures during in-use and post-crash conditionsmore » and on the allowable hydrogen emissions levels in vehicle exhaust during certain modes of normal operation. However, in order to be incorporated into national regulations, that is, to be legally binding, methods to verify compliance with the specific requirements must exist. In a collaborative program, the Sensor Laboratories at the National Renewable Energy Laboratory in the United States and the Joint Research Centre, Institute for Energy and Transport in the Netherlands have been evaluating and developing analytical methods that can be used to verify compliance with the hydrogen release requirements as specified in the GTR.« less

  4. Functional Foods Baseline and Requirements Analysis

    NASA Technical Reports Server (NTRS)

    Cooper, M. R.; Bermudez-Aguirre, L. D.; Douglas, G.

    2015-01-01

    Current spaceflight foods were evaluated to determine if their nutrient profile supports positioning as a functional food and if the stability of the bioactive compound within the food matrix over an extended shelf-life correlated with the expected storage duration during the mission. Specifically, the research aims were: Aim A. To determine the amount of each nutrient in representative spaceflight foods immediately after processing and at predetermined storage time to establish the current nutritional state. Aim B. To identify the requirements to develop foods that stabilize these nutrients such that required concentrations are maintained in the space food system throughout long duration missions (up to five years). Aim C. To coordinate collaborations with health and performance groups that may require functional foods as a countermeasure.

  5. Research on the technical requirements standards of high efficiency precipitator in power industries for assessment

    NASA Astrophysics Data System (ADS)

    Jin, Huang; Ling, Lin; Jun, Guo; Jianguo, Li; Yongzhong, Wang

    2017-11-01

    Facing the increasingly severe situation of air pollution, China are now positively promoting the evaluation of high efficiency air pollution control equipments and the research of the relative national standards. This paper showed the significance and the effect of formulating the technical requirements of high efficiency precipitator equipments for assessment national standards in power industries as well as the research thoughts and principle of these standards. It introduce the qualitative and quantitative evaluation requirements of high efficiency precipitators using in power industries and the core technical content such as testing, calculating, evaluation methods and so on. The implementation of a series of national standards is in order to lead and promote the production and application of high efficiency precipitator equipments in the field of the prevention of air pollution in national power industries.

  6. 78 FR 52963 - 60-Day Notice of Proposed Information Collection: Technical Processing Requirements for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-27

    ... Information Collection: Technical Processing Requirements for Multifamily Project Mortgage Insurance AGENCY...: HUD is seeking approval from the Office of Management and Budget (OMB) for the information collection... interested parties on the proposed collection of information. The purpose of this notice is to allow for 60...

  7. 47 CFR 15.509 - Technical requirements for ground penetrating radars and wall imaging systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false Technical requirements for ground penetrating radars and wall imaging systems. 15.509 Section 15.509 Telecommunication FEDERAL COMMUNICATIONS... ground penetrating radars and wall imaging systems. (a) The UWB bandwidth of an imaging system operating...

  8. 47 CFR 15.509 - Technical requirements for ground penetrating radars and wall imaging systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 1 2013-10-01 2013-10-01 false Technical requirements for ground penetrating radars and wall imaging systems. 15.509 Section 15.509 Telecommunication FEDERAL COMMUNICATIONS... ground penetrating radars and wall imaging systems. (a) The UWB bandwidth of an imaging system operating...

  9. 47 CFR 15.509 - Technical requirements for ground penetrating radars and wall imaging systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false Technical requirements for ground penetrating radars and wall imaging systems. 15.509 Section 15.509 Telecommunication FEDERAL COMMUNICATIONS... ground penetrating radars and wall imaging systems. (a) The UWB bandwidth of an imaging system operating...

  10. 47 CFR 15.509 - Technical requirements for ground penetrating radars and wall imaging systems.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 1 2014-10-01 2014-10-01 false Technical requirements for ground penetrating radars and wall imaging systems. 15.509 Section 15.509 Telecommunication FEDERAL COMMUNICATIONS... ground penetrating radars and wall imaging systems. (a) The UWB bandwidth of an imaging system operating...

  11. 47 CFR 15.509 - Technical requirements for ground penetrating radars and wall imaging systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Technical requirements for ground penetrating radars and wall imaging systems. 15.509 Section 15.509 Telecommunication FEDERAL COMMUNICATIONS... ground penetrating radars and wall imaging systems. (a) The UWB bandwidth of an imaging system operating...

  12. Evaluation of Baseline CD4+ T Cell Counts and ART Requirement in Newly Diagnosed HIV Seropositive Individuals in a Tertiary Care Hospital of Northern India.

    PubMed

    Bhattar, Sonali; Mehra, Bhanu; Bhalla, Preena; Rawat, Deepti

    2016-11-01

    Antiretroviral Therapy (ART) has changed the outlook of Human Immune-deficiency Virus (HIV)/Acquired Immuno Deficiency Syndrome (AIDS) patients worldwide. To analyse the trends in baseline CD4+ T cell counts and ART requirements in newly diagnosed HIV seropositive individuals in a Tertiary care hospital of Northern India. Out of 1263 HIV seropositive clients identified from January 2012 to June 2014, the baseline CD4+ T cell counts of only those 470 clients were analysed, who registered at the linked ART centre. The mean baseline CD4+ count of the study group was 249.77±216.0cells/mm 3 and that of male and female were 300.31±240.47cells/mm 3 and 232.38±204.25cells/mm 3 respectively. A total of 259 of 334 (77.54%) HIV reactive males, 83 of 130 (63.85%) HIV reactive females and overall 348 of 470 (74.04%) required antiretroviral treatment on enrolment. In the present study, about three-fourth of newly diagnosed HIV positive Indian patients required initiation of ART at registration. The relatively low baseline CD4+ T cell counts in this population highlights the need for timely baseline CD4+ counts testing of HIV positive patients and the urgency of initiating treatment in HIV reactive individuals in Indian health care settings.

  13. 10 CFR 35.2647 - Records of additional technical requirements for mobile remote afterloader units.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... remote afterloader units. 35.2647 Section 35.2647 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Records § 35.2647 Records of additional technical requirements for mobile remote afterloader units. (a) A licensee shall retain a record of each check for mobile remote afterloader units...

  14. 10 CFR 35.2647 - Records of additional technical requirements for mobile remote afterloader units.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... remote afterloader units. 35.2647 Section 35.2647 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Records § 35.2647 Records of additional technical requirements for mobile remote afterloader units. (a) A licensee shall retain a record of each check for mobile remote afterloader units...

  15. 10 CFR 35.2647 - Records of additional technical requirements for mobile remote afterloader units.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... remote afterloader units. 35.2647 Section 35.2647 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Records § 35.2647 Records of additional technical requirements for mobile remote afterloader units. (a) A licensee shall retain a record of each check for mobile remote afterloader units...

  16. 10 CFR 35.2647 - Records of additional technical requirements for mobile remote afterloader units.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... remote afterloader units. 35.2647 Section 35.2647 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Records § 35.2647 Records of additional technical requirements for mobile remote afterloader units. (a) A licensee shall retain a record of each check for mobile remote afterloader units...

  17. 10 CFR 35.2647 - Records of additional technical requirements for mobile remote afterloader units.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... remote afterloader units. 35.2647 Section 35.2647 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Records § 35.2647 Records of additional technical requirements for mobile remote afterloader units. (a) A licensee shall retain a record of each check for mobile remote afterloader units...

  18. Technical Requirements For Reactors To Be Deployed Internationally For the Global Nuclear Energy Partnership

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ingersoll, Daniel T

    2007-01-01

    Technical Requirements For Reactors To Be Deployed Internationally For the Global Nuclear Energy Partnership Robert Price U.S. Department of Energy, 1000 Independence Ave, SW, Washington, DC 20585, Daniel T. Ingersoll Oak Ridge National Laboratory, P.O. Box 2008, Oak Ridge, TN 37831-6162, INTRODUCTION The Global Nuclear Energy Partnership (GNEP) seeks to create an international regime to support large-scale growth in the worldwide use of nuclear energy. Fully meeting the GNEP vision may require the deployment of thousands of reactors in scores of countries, many of which do not use nuclear energy currently. Some of these needs will be met by large-scalemore » Generation III and III+ reactors (>1000 MWe) and Generation IV reactors when they are available. However, because many developing countries have small and immature electricity grids, the currently available Generation III(+) reactors may be unsuitable since they are too large, too expensive, and too complex. Therefore, GNEP envisions new types of reactors that must be developed for international deployment that are "right sized" for the developing countries and that are based on technologies, designs, and policies focused on reducing proliferation risk. The first step in developing such systems is the generation of technical requirements that will ensure that the systems meet both the GNEP policy goals and the power needs of the recipient countries. REQUIREMENTS Reactor systems deployed internationally within the GNEP context must meet a number of requirements similar to the safety, reliability, economics, and proliferation goals established for the DOE Generation IV program. Because of the emphasis on deployment to nonnuclear developing countries, the requirements will be weighted differently than with Generation IV, especially regarding safety and non-proliferation goals. Also, the reactors should be sized for market conditions in developing countries where energy demand per capita, institutional maturity

  19. 47 CFR 80.275 - Technical Requirements for Class A Automatic Identification System (AIS) equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Technical Requirements for Class A Automatic Identification System (AIS) equipment. 80.275 Section 80.275 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES STATIONS IN THE MARITIME SERVICES Equipment Authorization for Compulsory Ships § 80.275...

  20. Framework conditions and requirements to ensure the technical functional safety of reprocessed medical devices.

    PubMed

    Kraft, Marc

    2008-09-03

    Testing and restoring technical-functional safety is an essential part of medical device reprocessing. Technical functional tests have to be carried out on the medical device in the course of the validation of reprocessing procedures. These ensure (in addition to the hygiene tests) that the reprocessing procedure is suitable for the medical device. Functional tests are, however, also a part of reprocessing procedures. As a stage in the reprocessing, they ensure for the individual medical device that no damage or other changes limit the performance. When determining which technical-functional tests are to be carried out, the current technological standard has to be taken into account in the form of product-specific and process-oriented norms. Product-specific norms primarily define safety-relevant requirements. The risk management method described in DIN EN ISO 14971 is the basis for recognising hazards; the likelihood of such hazards arising can be minimised through additional technical-functional tests, which may not yet have been standardised. Risk management is part of a quality management system, which must be bindingly certified for manufacturers and processors of critical medical devices with particularly high processing demands by a body accredited by the competent authority.

  1. Framework conditions and requirements to ensure the technical functional safety of reprocessed medical devices

    PubMed Central

    Kraft, Marc

    2008-01-01

    Testing and restoring technical-functional safety is an essential part of medical device reprocessing. Technical functional tests have to be carried out on the medical device in the course of the validation of reprocessing procedures. These ensure (in addition to the hygiene tests) that the reprocessing procedure is suitable for the medical device. Functional tests are, however, also a part of reprocessing procedures. As a stage in the reprocessing, they ensure for the individual medical device that no damage or other changes limit the performance. When determining which technical-functional tests are to be carried out, the current technological standard has to be taken into account in the form of product-specific and process-oriented norms. Product-specific norms primarily define safety-relevant requirements. The risk management method described in DIN EN ISO 14971 is the basis for recognising hazards; the likelihood of such hazards arising can be minimised through additional technical-functional tests, which may not yet have been standardised. Risk management is part of a quality management system, which must be bindingly certified for manufacturers and processors of critical medical devices with particularly high processing demands by a body accredited by the competent authority. PMID:20204095

  2. 49 CFR 171.24 - Additional requirements for the use of the ICAO Technical Instructions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 2 2010-10-01 2010-10-01 false Additional requirements for the use of the ICAO... the United States by aircraft, and by motor vehicle or rail either before or after being transported by aircraft in accordance with the ICAO Technical Instructions (IBR, see § 171.7), as authorized in...

  3. 40 CFR 80.850 - How is the compliance baseline determined?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false How is the compliance baseline... Requirements § 80.850 How is the compliance baseline determined? (a) The compliance baseline to which annual... equation: ER29mr01.001 Where: TCBase = Compliance baseline toxics value. TBase = Baseline toxics value for...

  4. Video requirements for remote medical diagnosis

    NASA Technical Reports Server (NTRS)

    Davis, J. G.

    1974-01-01

    Minimal television system requirements for medical telediagnosis were studied. The experiment was conducted with the aid of a simulated telemedicine system. The first step involved making high quality videotape recordings of actual medical examinations conducted by a skilled nurse under the direction of a physician watching on closed circuit television. These recordings formed the baseline for the study. Next, these videotape recordings were electronically degraded to simulate television systems of less than broadcast quality. Finally, the baseline and degraded video recordings were shown (via a statistically randomized procedure) to a large number of physicians who attempted to reach a correct medical diagnosis and to visually recognize key physical signs for each patient. By careful scoring and analysis of the results of these viewings, the pictorial and diagnostic limitations as a function of technical video characteristics were to be defined.

  5. Airborne Laser Remote Sensor for Oil Detection and Classification : Engineering Requirements and Technical Considerations Relevant to a Performance Specification

    DOT National Transportation Integrated Search

    1975-08-01

    This report outlines the engineering requirements for an Airborne Laser Remote Sensor for Oil Detection and Classification System. Detailed engineering requirements are given for the major units of the system. Technical considerations pertinent to a ...

  6. Passive range estimation using dual baseline triangulation

    NASA Astrophysics Data System (ADS)

    Pieper, Ronald J.; Cooper, Alfred W.; Pelegris, G.

    1996-03-01

    Modern combat systems based on active radar sensing suffer disadvantages against low-flying targets in cluttered backgrounds. Use of passive infrared sensors with these systems, either in cooperation or as an alternative, shows potential for improving target detection and declaration range for targets crossing the horizon. Realization of this potential requires fusion of target position data from dissimilar sensors, or passive sensor measurement of target range. The availability of passive sensors that can supply both range and bearing data on such targets would significantly extend the robustness of an integrated ship self-defense system. This paper considers a new method of range determination with passive sensors based on the principle of triangulation, extending the principle to two orthogonal baselines. The performance of single or double baseline triangulation depends on sensor bearing precision and direction to target. An expression for maximum triangulation range at a required accuracy is derived as a function of polar angle relative to the center of the dual-baseline system. Limitations in the dual- baseline model due to the geometrically assessed horizon are also considered.

  7. Launch Vehicle Design Process: Characterization, Technical Integration, and Lessons Learned

    NASA Technical Reports Server (NTRS)

    Blair, J. C.; Ryan, R. S.; Schutzenhofer, L. A.; Humphries, W. R.

    2001-01-01

    Engineering design is a challenging activity for any product. Since launch vehicles are highly complex and interconnected and have extreme energy densities, their design represents a challenge of the highest order. The purpose of this document is to delineate and clarify the design process associated with the launch vehicle for space flight transportation. The goal is to define and characterize a baseline for the space transportation design process. This baseline can be used as a basis for improving effectiveness and efficiency of the design process. The baseline characterization is achieved via compartmentalization and technical integration of subsystems, design functions, and discipline functions. First, a global design process overview is provided in order to show responsibility, interactions, and connectivity of overall aspects of the design process. Then design essentials are delineated in order to emphasize necessary features of the design process that are sometimes overlooked. Finally the design process characterization is presented. This is accomplished by considering project technical framework, technical integration, process description (technical integration model, subsystem tree, design/discipline planes, decision gates, and tasks), and the design sequence. Also included in the document are a snapshot relating to process improvements, illustrations of the process, a survey of recommendations from experienced practitioners in aerospace, lessons learned, references, and a bibliography.

  8. 47 CFR 76.1608 - System technical integration requiring uniform election of must-carry or retransmission consent...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 4 2014-10-01 2014-10-01 false System technical integration requiring uniform election of must-carry or retransmission consent status. 76.1608 Section 76.1608 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE...

  9. 47 CFR 76.1608 - System technical integration requiring uniform election of must-carry or retransmission consent...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false System technical integration requiring uniform election of must-carry or retransmission consent status. 76.1608 Section 76.1608 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE...

  10. 47 CFR 76.1608 - System technical integration requiring uniform election of must-carry or retransmission consent...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 4 2013-10-01 2013-10-01 false System technical integration requiring uniform election of must-carry or retransmission consent status. 76.1608 Section 76.1608 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE...

  11. 47 CFR 76.1608 - System technical integration requiring uniform election of must-carry or retransmission consent...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 4 2012-10-01 2012-10-01 false System technical integration requiring uniform election of must-carry or retransmission consent status. 76.1608 Section 76.1608 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE...

  12. 47 CFR 76.1608 - System technical integration requiring uniform election of must-carry or retransmission consent...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false System technical integration requiring uniform election of must-carry or retransmission consent status. 76.1608 Section 76.1608 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE...

  13. CALS Baseline Architecture Analysis of Weapons System. Technical Information: Army, Draft. Volume 8

    DOT National Transportation Integrated Search

    1989-09-01

    This effort was performed to provide a common framework for analysis and planning of CALS initiatives across the military services, leading eventually to the development of a common DoD-wide architecture for CALS. This study addresses Army technical ...

  14. 16 CFR 1404.4 - Requirements to provide performance and technical data by labeling-Notice to purchasers.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... fixtures. Do not place insulation over such fixtures so as to entrap heat. Also keep this insulation away... SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS CELLULOSE INSULATION § 1404.4 Requirements to... insulation shall give notification of performance and technical data related to performance and safety (1) to...

  15. 16 CFR 1404.4 - Requirements to provide performance and technical data by labeling-Notice to purchasers.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... fixtures. Do not place insulation over such fixtures so as to entrap heat. Also keep this insulation away... SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS CELLULOSE INSULATION § 1404.4 Requirements to... insulation shall give notification of performance and technical data related to performance and safety (1) to...

  16. 16 CFR 1404.4 - Requirements to provide performance and technical data by labeling-Notice to purchasers.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... fixtures. Do not place insulation over such fixtures so as to entrap heat. Also keep this insulation away... SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS CELLULOSE INSULATION § 1404.4 Requirements to... insulation shall give notification of performance and technical data related to performance and safety (1) to...

  17. 16 CFR 1404.4 - Requirements to provide performance and technical data by labeling-Notice to purchasers.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... fixtures. Do not place insulation over such fixtures so as to entrap heat. Also keep this insulation away... SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS CELLULOSE INSULATION § 1404.4 Requirements to... insulation shall give notification of performance and technical data related to performance and safety (1) to...

  18. [Implementation of the technical requirements of the UNE-EN-ISO 15189 quality standard in a mycobacterial laboratory].

    PubMed

    Guna Serrano, M del Remedio; Ocete Mochón, M Dolores; Lahiguera, M José; Bresó, M Carmen; Gimeno Cardona, Concepción

    2013-02-01

    The UNE-EN-ISO 15189:2007 standard defines the requirements for quality and competence that must be met by medical laboratories. These laboratories should use this international standard to develop their own quality management systems and to evaluate their own competencies; in turn, this standard will be used by accreditation bodies to confirm or recognize the laboratories' competence. In clinical microbiology laboratories, application of the standard implies the implementation of the technical and specific management requirements that must be met to achieve optimal quality when carrying out microbiological tests. In Spain, accreditation is granted by the Spanish Accreditation Body (Entidad Nacional de Acreditación). This review aims to discuss the practical application of the standard's technical requirements in mycobacterial laboratory. Firstly, we define the scope of accreditation. Secondly, we specify how the items of the standard on personnel management, control of equipment, environmental facilities, method validation, internal controls and customer satisfaction surveys were developed and implemented in our laboratory. Copyright © 2013 Elsevier España, S.L. All rights reserved.

  19. Estimation of Managerial and Technical Personnel Requirements in Selected Industries. Training for Industry Series, No. 2.

    ERIC Educational Resources Information Center

    United Nations Industrial Development Organization, Vienna (Austria).

    The need to develop managerial and technical personnel in the cement, fertilizer, pulp and paper, sugar, leather and shoe, glass, and metal processing industries of various nations was studied, with emphasis on necessary steps in developing nations to relate occupational requirements to technology, processes, and scale of output. Estimates were…

  20. Consensus statement for use and technical requirements of thyroid ultrasound in endocrinology units.

    PubMed

    Martín-Hernández, Tomás; Díez Gómez, Juan José; Díaz-Soto, Gonzalo; Torres Cuadro, Alberto; Navarro González, Elena; Oleaga Alday, Amelia; Sambo Salas, Marcel; Reverter Calatayud, Jordi L; Argüelles Jiménez, Iñaki; Mancha Doblas, Isabel; Fernández García, Diego; Galofré, Juan Carlos

    2017-03-01

    Thyroid nodule detection has increased with widespread use of ultrasound, which is currently the main tool for detection, monitoring, diagnosis and, in some instances, treatment of thyroid nodules. Knowledge of ultrasound and adequate instruction on its use require a position statement by the scientific societies concerned. The working groups on thyroid cancer and ultrasound techniques of the Spanish Society of Endocrinology and Nutrition have promoted this document, based on a thorough analysis of the current literature, the results of multicenter studies and expert consensus, in order to set the requirements for the best use of ultrasound in clinical practice. The objectives include the adequate framework for use of thyroid ultrasound, the technical and legal requirements, the clinical situations in which it is recommended, the levels of knowledge and learning processes, the associated responsibility, and the establishment of a standardized reporting of results and integration into hospital information systems and endocrinology units. Copyright © 2017 SEEN. Publicado por Elsevier España, S.L.U. All rights reserved.

  1. Conceptual design of a moving belt radiator shuttle-attached experiments: Technical requirement Document

    NASA Technical Reports Server (NTRS)

    Aguilar, Jerry L.

    1989-01-01

    The technical requirements for a shuttle-attached Moving Belt Radiator (MBR) experiment are defined. The MBR is an advanced radiator concept in which a rotating belt radiates thermal energy to space. The requirements for integrating the MBR experiment in the shuttle bay are discussed. Requirements for the belt material and working fluid are outlined along with some possible options. The proposed size and relationship to a full scale Moving Belt Radiator are defined. The experiment is defined with the primary goal of dynamic testing and a secondary goal of demonstrating the sealing and heat transfer characteristics. A perturbation system which will simulate a docking maneuver or other type of short term acceleration is proposed for inclusion in the experimental apparatus. A deployment and retraction capability which will aid in evaluating the dynamics of a belt during such a maneuver is also described. The proposed test sequence for the experiment is presented. Details of the conceptual design are not presented herein, but rather in a separate Final Report.

  2. Technical report analysis and design: Study of solid rocket motors for a space shuttle booster, volume 2, book 1, supplement 1

    NASA Technical Reports Server (NTRS)

    1972-01-01

    An analysis and design effort was conducted as part of the study of solid rocket motor for a space shuttle booster. The 156-inch-diameter, parallel burn solid rocket motor was selected as its baseline because it is transportable and is the most cost-effective, reliable system that has been developed and demonstrated. The basic approach was to concentrate on the selected baseline design, and to draw from the baseline sufficient data to describe the alternate approaches also studied. The following conclusions were reached with respect to technical feasibility of the use of solid rocket booster motors for the space shuttle vehicle: (1) The 156-inch, parallel-burn baseline SRM design meets NASA's study requirements while incorporating conservative safety factors. (2) The solid rocket motor booster represents a cost-effective approach. (3) Baseline costs are conservative and are based on a demonstrated design. (4) Recovery and reuse are feasible and offer substantial cost savings. (5) Abort can be accomplished successfully. (6) Ecological effects are acceptable.

  3. Logistics Operations Management Center: Maintenance Support Baseline (LOMC-MSB)

    NASA Technical Reports Server (NTRS)

    Kurrus, R.; Stump, F.

    1995-01-01

    The Logistics Operations Management Center Maintenance Support Baseline is defined. A historical record of systems, applied to and deleted from, designs in support of future management and/or technical analysis is provided. All Flight elements, Ground Support Equipment, Facility Systems and Equipment and Test Support Equipment for which LOMC has responsibilities at Kennedy Space Center and other locations are listed. International Space Station Alpha Program documentation is supplemented. The responsibility of the Space Station Launch Site Support Office is established.

  4. Bias error reduction using ratios to baseline experiments. Heat transfer case study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chakroun, W.; Taylor, R.P.; Coleman, H.W.

    1993-10-01

    Employing a set of experiments devoted to examining the effect of surface finish (riblets) on convective heat transfer as an example, this technical note seeks to explore the notion that precision uncertainties in experiments can be reduced by repeated trials and averaging. This scheme for bias error reduction can give considerable advantage when parametric effects are investigated experimentally. When the results of an experiment are presented as a ratio with the baseline results, a large reduction in the overall uncertainty can be achieved when all the bias limits in the variables of the experimental result are fully correlated with thosemore » of the baseline case. 4 refs.« less

  5. 40 CFR 80.93 - Individual baseline submission and approval.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., or designee, indicating that insufficient data exist for a baseline determination by the types of...-type data is utilized. All requirements of this paragraph shall be reported separately for each... which may assist EPA in its review of the baseline; (ii) Identification of the data-type(s), per § 80.91...

  6. Very long baseline interferometry using a radio telescope in Earth orbit

    NASA Technical Reports Server (NTRS)

    Ulvestad, J. S.; Edwards, C. D.; Linfield, R. P.

    1987-01-01

    Successful Very Long Baseline Interferometry (VLBI) observations at 2.3 GHz were made using an antenna aboard an Earth-orbiting spacecraft as one of the receiving telescopes. These observations employed the first deployed satellite (TDRSE-E for East) of the NASA Tracking and Data Relay Satellite System (TDRSS). Fringes were found for 3 radio sources on baselines between TDRSE and telescopes in Australia and Japan. The purpose of this experiment and the characteristics of the spacecraft that are related to the VLBI observations are described. The technical obstacles to maintaining phase coherence between the orbiting antenna and the ground stations, as well as the calibration schemes for the communication link between TDRSE and its ground station at White Sands, New Mexico are explored. System coherence results and scientific results for the radio source observations are presented. Using all available calibrations, a coherence of 84% over 700 seconds was achieved for baselines to the orbiting telescope.

  7. A Procedural Skills OSCE: Assessing Technical and Non-Technical Skills of Internal Medicine Residents

    ERIC Educational Resources Information Center

    Pugh, Debra; Hamstra, Stanley J.; Wood, Timothy J.; Humphrey-Murto, Susan; Touchie, Claire; Yudkowsky, Rachel; Bordage, Georges

    2015-01-01

    Internists are required to perform a number of procedures that require mastery of technical and non-technical skills, however, formal assessment of these skills is often lacking. The purpose of this study was to develop, implement, and gather validity evidence for a procedural skills objective structured clinical examination (PS-OSCE) for internal…

  8. C2 Link Security for UAS: Technical Literature Study and Preliminary Functional Requirements. Version 0.9 (Working Draft)

    NASA Technical Reports Server (NTRS)

    2005-01-01

    This document provides a study of the technical literature related to Command and Control (C2) link security for Unmanned Aircraft Systems (UAS) for operation in the National Airspace System (NAS). Included is a preliminary set of functional requirements for C2 link security.

  9. Fuel cells for transport: can the promise be fulfilled? Technical requirements and demands from customers

    NASA Astrophysics Data System (ADS)

    Klaiber, Thomas

    The paper discusses the technical requirements and the customer demands for vehicles that have an on-board methanol reformer and fuel cells. The research concentrates on the technical developmental risks which include minimizing volume, reducing weight and, at the same time, improving efficiency and system dynamics. Fuel cell powered vehicles with methanol reformers are not only suitable for a niche market but also these vehicles will compete with conventional vehicles. The greatest hindrance will be the price of the fuel cell. A possible progressive development of the number of fuel cell powered vehicles in conjunction with a reduction in costs will be discussed in the paper. When fuel cell vehicles come to the market it is necessary that an infrastructure for the fuel methanol or hydrogen is installed. Therefore, it will only be possible to introduce fuel cell vehicles into special markets, e.g. California. Such a process will need to be subsidized by additional incentives like tax concessions. Today there are many technical risks and unsolved problems relating to production technologies, infrastructure, and costs. Nevertheless, among the alternative power units, the fuel cell seems to be the only one that might be competitive to the conventional power unit, especially relating to emissions.

  10. Baseline Report on HB2320

    ERIC Educational Resources Information Center

    State Council of Higher Education for Virginia, 2015

    2015-01-01

    Staff provides this baseline report as a summary of its preliminary considerations and initial research in fulfillment of the requirements of HB2320 from the 2015 session of the General Assembly. Codified as § 23-7.4:7, this legislation compels the Education Secretary and the State Council of Higher Education for Virginia (SCHEV) Director, in…

  11. Large-baseline InSAR for precise topographic mapping: a framework for TanDEM-X large-baseline data

    NASA Astrophysics Data System (ADS)

    Pinheiro, Muriel; Reigber, Andreas; Moreira, Alberto

    2017-09-01

    The global Digital Elevation Model (DEM) resulting from the TanDEM-X mission provides information about the world topography with outstanding precision. In fact, performance analysis carried out with the already available data have shown that the global product is well within the requirements of 10 m absolute vertical accuracy and 2 m relative vertical accuracy for flat to moderate terrain. The mission's science phase took place from October 2014 to December 2015. During this phase, bistatic acquisitions with across-track separation between the two satellites up to 3.6 km at the equator were commanded. Since the relative vertical accuracy of InSAR derived elevation models is, in principle, inversely proportional to the system baseline, the TanDEM-X science phase opened the doors for the generation of elevation models with improved quality with respect to the standard product. However, the interferometric processing of the large-baseline data is troublesome due to the increased volume decorrelation and very high frequency of the phase variations. Hence, in order to fully profit from the increased baseline, sophisticated algorithms for the interferometric processing, and, in particular, for the phase unwrapping have to be considered. This paper proposes a novel dual-baseline region-growing framework for the phase unwrapping of the large-baseline interferograms. Results from two experiments with data from the TanDEM-X science phase are discussed, corroborating the expected increased level of detail of the large-baseline DEMs.

  12. Hanford Waste Vitrification Plant technical manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Larson, D.E.; Watrous, R.A.; Kruger, O.L.

    1996-03-01

    A key element of the Hanford waste management strategy is the construction of a new facility, the Hanford Waste Vitrification Plant (HWVP), to vitrify existing and future liquid high-level waste produced by defense activities at the Hanford Site. The HWVP mission is to vitrify pretreated waste in borosilicate glass, cast the glass into stainless steel canisters, and store the canisters at the Hanford Site until they are shipped to a federal geological repository. The HWVP Technical Manual (Manual) documents the technical bases of the current HWVP process and provides a physical description of the related equipment and the plant. Themore » immediate purpose of the document is to provide the technical bases for preparation of project baseline documents that will be used to direct the Title 1 and Title 2 design by the A/E, Fluor. The content of the Manual is organized in the following manner. Chapter 1.0 contains the background and context within which the HWVP was designed. Chapter 2.0 describes the site, plant, equipment and supporting services and provides the context for application of the process information in the Manual. Chapter 3.0 provides plant feed and product requirements, which are primary process bases for plant operation. Chapter 4.0 summarizes the technology for each plant process. Chapter 5.0 describes the engineering principles for designing major types of HWVP equipment. Chapter 6.0 describes the general safety aspects of the plant and process to assist in safe and prudent facility operation. Chapter 7.0 includes a description of the waste form qualification program and data. Chapter 8.0 indicates the current status of quality assurance requirements for the Manual. The Appendices provide data that are too extensive to be placed in the main text, such as extensive tables and sets of figures. The Manual is a revision of the 1987 version.« less

  13. Technical Guidance for Assessing Environmental Justice in ...

    EPA Pesticide Factsheets

    The Technical Guidance for Assessing Environmental Justice in Regulatory Analysis (also referred to as the Environmental Justice Technical Guidance or EJTG) is intended for use by Agency analysts, including risk assessors, economists, and other analytic staff that conduct analyses to evaluate EJ concerns in the context of regulatory actions. Senior EPA managers and decision makers also may find this document useful to understand analytic expectations and to ensure that EJ concerns are appropriately considered in the development of analyses to support regulatory actions under EPA’s action development process. Specifically, the document outlines approaches and methods to help Agency analysts evaluate EJ concerns. The document provides overarching direction to analysts by outlining a series of questions that will ensure the decision maker has appropriate information about baseline risks across population groups, and how those risks are distributed under the options being considered. In addition, the document provides a set of recommendations and requirements as well as best practices for use in analyzing and reporting results from consideration of EJ concerns. These principles will help ensure consistency, quality, and transparency across regulatory actions, while allowing for flexibility needed across different regulatory actions. The purpose of the EJTG is ensure consistency, quality, and transparency in considering environmental justice, while allowing f

  14. Baseline LAW Glass Formulation Testing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kruger, Albert A.; Mooers, Cavin; Bazemore, Gina

    2013-06-13

    The major objective of the baseline glass formulation work was to develop and select glass formulations that are compliant with contractual and processing requirements for each of the LAW waste streams. Other objectives of the work included preparation and characterization of glasses with respect to the properties of interest, optimization of sulfate loading in the glasses, evaluation of ability to achieve waste loading limits, testing to demonstrate compatibility of glass melts with melter materials of construction, development of glass formulations to support ILAW qualification activities, and identification of glass formulation issues with respect to contract specifications and processing requirements.

  15. A long baseline global stereo matching based upon short baseline estimation

    NASA Astrophysics Data System (ADS)

    Li, Jing; Zhao, Hong; Li, Zigang; Gu, Feifei; Zhao, Zixin; Ma, Yueyang; Fang, Meiqi

    2018-05-01

    In global stereo vision, balancing the matching efficiency and computing accuracy seems to be impossible because they contradict each other. In the case of a long baseline, this contradiction becomes more prominent. In order to solve this difficult problem, this paper proposes a novel idea to improve both the efficiency and accuracy in global stereo matching for a long baseline. In this way, the reference images located between the long baseline image pairs are firstly chosen to form the new image pairs with short baselines. The relationship between the disparities of pixels in the image pairs with different baselines is revealed by considering the quantized error so that the disparity search range under the long baseline can be reduced by guidance of the short baseline to gain matching efficiency. Then, the novel idea is integrated into the graph cuts (GCs) to form a multi-step GC algorithm based on the short baseline estimation, by which the disparity map under the long baseline can be calculated iteratively on the basis of the previous matching. Furthermore, the image information from the pixels that are non-occluded under the short baseline but are occluded for the long baseline can be employed to improve the matching accuracy. Although the time complexity of the proposed method depends on the locations of the chosen reference images, it is usually much lower for a long baseline stereo matching than when using the traditional GC algorithm. Finally, the validity of the proposed method is examined by experiments based on benchmark datasets. The results show that the proposed method is superior to the traditional GC method in terms of efficiency and accuracy, and thus it is suitable for long baseline stereo matching.

  16. 47 CFR 18.207 - Technical report.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 1 2013-10-01 2013-10-01 false Technical report. 18.207 Section 18.207... Applications and Authorizations § 18.207 Technical report. When required by the Commission a technical report...(s) under which the equipment is or will be marketed. (e) A statement of the rated technical...

  17. 47 CFR 18.207 - Technical report.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 1 2014-10-01 2014-10-01 false Technical report. 18.207 Section 18.207... Applications and Authorizations § 18.207 Technical report. When required by the Commission a technical report...(s) under which the equipment is or will be marketed. (e) A statement of the rated technical...

  18. 47 CFR 18.207 - Technical report.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false Technical report. 18.207 Section 18.207... Applications and Authorizations § 18.207 Technical report. When required by the Commission a technical report...(s) under which the equipment is or will be marketed. (e) A statement of the rated technical...

  19. 48 CFR 2052.211-70 - Preparation of technical reports.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ....211-70 Preparation of technical reports. As prescribed at 2011.104-70(a), the contracting officer... Reports (JAN 1993) All technical reports required by Section C and all Technical Progress Reports required... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Preparation of technical...

  20. 48 CFR 2052.211-70 - Preparation of technical reports.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ....211-70 Preparation of technical reports. As prescribed at 2011.104-70(a), the contracting officer... Reports (JAN 1993) All technical reports required by Section C and all Technical Progress Reports required... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Preparation of technical...

  1. 48 CFR 2052.211-70 - Preparation of technical reports.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ....211-70 Preparation of technical reports. As prescribed at 2011.104-70(a), the contracting officer... Reports (JAN 1993) All technical reports required by Section C and all Technical Progress Reports required... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Preparation of technical...

  2. 48 CFR 2052.211-70 - Preparation of technical reports.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ....211-70 Preparation of technical reports. As prescribed at 2011.104-70(a), the contracting officer... Reports (JAN 1993) All technical reports required by Section C and all Technical Progress Reports required... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Preparation of technical...

  3. 48 CFR 2052.211-70 - Preparation of technical reports.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ....211-70 Preparation of technical reports. As prescribed at 2011.104-70(a), the contracting officer... Reports (JAN 1993) All technical reports required by Section C and all Technical Progress Reports required... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Preparation of technical...

  4. Assessing Students' Technical Skill Attainment

    ERIC Educational Resources Information Center

    Jorgensen, Haley

    2010-01-01

    The Wisconsin Technical College System (WTCS) is working to comply with the Carl D. Perkins Career and Technical Education Improvement Act of 2006 (Perkins) to ensure that its graduates have mastered the technical skills needed by business and industry. The legislation requires that each state identify and approve program assessment strategies…

  5. International Linear Collider Technical Design Report (Volumes 1 through 4)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harrison M.

    2013-03-27

    The design report consists of four volumes: Volume 1, Executive Summary; Volume 2, Physics; Volume 3, Accelerator (Part I, R and D in the Technical Design Phase, and Part II, Baseline Design); and Volume 4, Detectors.

  6. Earth Orientation Effects on Mobile VLBI Baselines

    NASA Technical Reports Server (NTRS)

    Allen, S. L.

    1984-01-01

    Improvements in data quality for the mobile VLBI systems have placed higher accuracy requirements on Earth orientation calibrations. Errors in these calibrations may give rise to systematic effects in the nonlength components of the baselines. Various sources of Earth orientation data were investigated for calibration of Mobile VLBI baselines. Significant differences in quality between the several available sources of UT1-UTC were found. It was shown that the JPL Kalman filtered space technology data were at least as good as any other and adequate to the needs of current Mobile VLBI systems and observing plans. For polar motion, the values from all service suffice. The effect of Earth orientation errors on the accuracy of differenced baselines was also investigated. It is shown that the effect is negligible for the current mobile systems and observing plan.

  7. The French Space Operation Act: Technical Regulations

    NASA Astrophysics Data System (ADS)

    Trinchero, J. P.; Lazare, B.

    2010-09-01

    The French Space Operation Act(FSOA) stipulates that a prime objective of the National technical regulations is to protect people, property, public health and the environment. Compliance with these technical regulations is mandatory as of 10 December 2010 for space operations by French space operators and for space operations from French territory. The space safety requirements and regulations governing procedures are based on national and international best practices and experience. A critical design review of the space system and procedures shall be carried out by the applicant, in order to verify compliance with the Technical Regulations. An independent technical assessment of the operation is delegated to CNES. The principles applied when drafting technical regulations are as follows: requirements must as far as possible establish the rules according to the objective to be obtained, rather than how it is to be achieved; requirements must give preference to international standards recognised as being the state of the art; requirements must take previous experience into account. Technical regulations are divided into three sections covering common requirements for the launch, control and return of a space object. A dedicated section will cover specific rules to be applied at the Guiana Space Centre. The main topics addressed by the technical regulations are: operator safety management system; study of risks to people, property, public health and the Earth’s environment; impact study on the outer space environment: space debris generated by the operation; planetary protection.

  8. 40 CFR 74.20 - Data for baseline and alternative baseline.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 17 2012-07-01 2012-07-01 false Data for baseline and alternative... PROGRAMS (CONTINUED) SULFUR DIOXIDE OPT-INS Allowance Calculations for Combustion Sources § 74.20 Data for baseline and alternative baseline. (a) Acceptable data. (1) The designated representative of a combustion...

  9. MODIS. Volume 1: MODIS level 1A software baseline requirements

    NASA Technical Reports Server (NTRS)

    Masuoka, Edward; Fleig, Albert; Ardanuy, Philip; Goff, Thomas; Carpenter, Lloyd; Solomon, Carl; Storey, James

    1994-01-01

    This document describes the level 1A software requirements for the moderate resolution imaging spectroradiometer (MODIS) instrument. This includes internal and external requirements. Internal requirements include functional, operational, and data processing as well as performance, quality, safety, and security engineering requirements. External requirements include those imposed by data archive and distribution systems (DADS); scheduling, control, monitoring, and accounting (SCMA); product management (PM) system; MODIS log; and product generation system (PGS). Implementation constraints and requirements for adapting the software to the physical environment are also included.

  10. International Low Impact Docking System (iLIDS) Project Technical Requirements Specification, Revision F

    NASA Technical Reports Server (NTRS)

    Lewis, James L.

    2011-01-01

    The NASA Docking System (NDS) is NASA's implementation for the emerging International Docking System Standard (IDSS) using low impact docking technology. The NASA Docking System Project (NDSP) is the International Space Station (ISS) Program's project to produce the NDS, Common Docking Adapter (CDA) and Docking Hub. The NDS design evolved from the Low Impact Docking System (LIDS). The acronym international Low Impact Docking System (iLIDS) is also used to describe this system as well as the Government Furnished Equipment (GFE) project designing the NDS for the NDSP. NDS and iLIDS may be used interchangeability. This document will use the acronym iLIDS. Some of the heritage documentation and implementations (e.g., software command names, requirement identification (ID), figures, etc.) used on NDS will continue to use the LIDS acronym. This specification defines the technical requirements for the iLIDS GFE delivered to the NDSP by the iLIDS project. This document contains requirements for two iLIDS configurations, SEZ29101800-301 and SEZ29101800-302. Requirements with the statement, iLIDS shall, are for all configurations. Examples of requirements that are unique to a single configuration may be identified as iLIDS (-301) shall or iLIDS (-302) shall. Furthermore, to allow a requirement to encompass all configurations with an exception, the requirement may be designated as iLIDS (excluding -302) shall. Verification requirements for the iLIDS project are identified in the Verification Matrix (VM) provided in the iLIDS Verification and Validation Document, JSC-63966. The following definitions differentiate between requirements and other statements: Shall: This is the only verb used for the binding requirements. Should/May: These verbs are used for stating non-mandatory goals. Will: This verb is used for stating facts or declaration of purpose. A Definition of Terms table is provided in Appendix B to define those terms with specific tailored uses in this document.

  11. 46 CFR 12.611 - Requirements to qualify for an STCW endorsement as electro-technical rating (ETR) on vessels...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 1 2014-10-01 2014-10-01 false Requirements to qualify for an STCW endorsement as electro-technical rating (ETR) on vessels powered by main propulsion machinery of 750 kW/1,000 HP or more... propulsion machinery of 750 kW/1,000 HP or more. (a) To qualify for an STCW endorsement as an electro...

  12. Air/Superfund national technical guidance study series, Volume 2. Estimation of baseline air emission at Superfund sites. Interim report(Final)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1989-01-01

    This volume is one in a series of manuals prepared for EPA to assist its Remedial Project Managers in the assessment of the air contaminant pathway and developing input data for risk assessment. The manual provides guidance on developing baseline-emission estimates from hazardous waste sites. Baseline-emission estimates (BEEs) are defined as emission rates estimated for a site in its undisturbed state. Specifically, the manual is intended to: Present a protocol for selecting the appropriate level of effort to characterize baseline air emissions; Assist site managers in designing an approach for BEEs; Describe useful technologies for developing site-specific baseline emission estimatesmore » (BEEs); Help site managers select the appropriate technologies for generating site-specific BEEs.« less

  13. Shuttle mission simulator baseline definition report, volume 1

    NASA Technical Reports Server (NTRS)

    Burke, J. F.; Small, D. E.

    1973-01-01

    A baseline definition of the space shuttle mission simulator is presented. The subjects discussed are: (1) physical arrangement of the complete simulator system in the appropriate facility, with a definition of the required facility modifications, (2) functional descriptions of all hardware units, including the operational features, data demands, and facility interfaces, (3) hardware features necessary to integrate the items into a baseline simulator system to include the rationale for selecting the chosen implementation, and (4) operating, maintenance, and configuration updating characteristics of the simulator hardware.

  14. GPS baseline configuration design based on robustness analysis

    NASA Astrophysics Data System (ADS)

    Yetkin, M.; Berber, M.

    2012-11-01

    The robustness analysis results obtained from a Global Positioning System (GPS) network are dramatically influenced by the configurationof the observed baselines. The selection of optimal GPS baselines may allow for a cost effective survey campaign and a sufficiently robustnetwork. Furthermore, using the approach described in this paper, the required number of sessions, the baselines to be observed, and thesignificance levels for statistical testing and robustness analysis can be determined even before the GPS campaign starts. In this study, wepropose a robustness criterion for the optimal design of geodetic networks, and present a very simple and efficient algorithm based on thiscriterion for the selection of optimal GPS baselines. We also show the relationship between the number of sessions and the non-centralityparameter. Finally, a numerical example is given to verify the efficacy of the proposed approach.

  15. Technical Assistance Needs Assessments (TANAs)

    EPA Pesticide Factsheets

    The Technical Assistance Needs Assessment (TANA) is a process to identify whether a community requires additional support from EPA in order to understand technical information and have meaningful participation in the Superfund decision-making process.

  16. 24 CFR 891.175 - Technical assistance.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Technical assistance. 891.175... Requirements § 891.175 Technical assistance. For purposes of the Section 202 Program and the Section 811 Program, the Secretary shall make available appropriate technical assistance to assure that applicants...

  17. Technical evaluation of RETS-required reports for Browns Ferry Nuclear Power Station, Units 1, 2, and 3, for 1983

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Young, T.E.; Magleby, E.H.

    1985-09-06

    A review was performed of reports required by federal regulations and the plant-specific radiological effluent technical specifications (RETS) for operations conducted at Tennessee Valley Authority's Browns Ferry Nuclear Station, Units 1, 2, and 3, during 1983. The two periodic reports reviewed were (a) the Effluents and Waste Disposal Semiannual Report, First Half 1983 and (b) the Effluents and Waste Disposal Semiannual Report, Second Half 1983. The principal review guidelines were the plant's specific RETs and NRC guidance given in NUREG-0133, ''Preparation of Radiological Effluent Technical Specifications for Nuclear Power Plants.'' The Licensee's submitted reports were found to be reasonably completemore » and consistent with the review guidelines.« less

  18. Spacelab baseline ECS trace contaminant removal test program

    NASA Technical Reports Server (NTRS)

    Ray, C. D.; Stanley, J. B.

    1977-01-01

    An estimate of the Spacelab Baseline Environmental Control System's contaminated removal capability was required to allow determination of the need for a supplemental trace contaminant removal system. Results from a test program to determine this removal capability are presented.

  19. The Maternal-to-Zygotic Transition in Higher Plants: Available Approaches, Critical Limitations, and Technical Requirements.

    PubMed

    Zhao, Peng; Sun, Meng-Xiang

    2015-01-01

    Fertilization marks the turnover from the gametophyte to sporophyte generation in higher plants. After fertilization, sporophytic development undergoes genetic turnover from maternal to zygotic control: the maternal-to-zygotic transition (MZT). The MZT is thought to be critical for early embryogenesis; however, little is known about the time course or developmental impact of the MZT in higher plants. Here, we discuss what is known in the field and focus on techniques used in relevant studies and their limitations. Some significant questions and technical requirements for further investigations are also discussed. © 2015 Elsevier Inc. All rights reserved.

  20. Predictive value of background experiences and visual spatial ability testing on laparoscopic baseline performance among residents entering postgraduate surgical training.

    PubMed

    Louridas, Marisa; Quinn, Lauren E; Grantcharov, Teodor P

    2016-03-01

    Emerging evidence suggests that despite dedicated practice, not all surgical trainees have the ability to reach technical competency in minimally invasive techniques. While selecting residents that have the ability to reach technical competence is important, evidence to guide the incorporation of technical ability into selection processes is limited. Therefore, the purpose of the present study was to evaluate whether background experiences and 2D-3D visual spatial test results are predictive of baseline laparoscopic skill for the novice surgical trainee. First-year residents were studied. Demographic data and background surgical and non-surgical experiences were obtained using a questionnaire. Visual spatial ability was evaluated using the PicSOr, cube comparison (CC) and card rotation (CR) tests. Technical skill was assessed using the camera navigation (LCN) task and laparoscopic circle cut (LCC) task. Resident performance on these technical tasks was compared and correlated with the questionnaire and visual spatial findings. Previous experience in observing laparoscopic procedures was associated with significantly better LCN performance, and experience in navigating the laparoscopic camera was associated with significantly better LCC task results. Residents who scored higher on the CC test demonstrated a more accurate LCN path length score (r s(PL) = -0.36, p = 0.03) and angle path (r s(AP) = -0.426, p = 0.01) score when completing the LCN task. No other significant correlations were found between the visual spatial tests (PicSOr, CC or CR) and LCC performance. While identifying selection tests for incoming surgical trainees that predict technical skill performance is appealing, the surrogate markers evaluated correlate with specific metrics of surgical performance related to a single task but do not appear to reliably predict technical performance of different laparoscopic tasks. Predicting the acquisition of technical skills will require the development

  1. Developing Technical Skill Assessments

    ERIC Educational Resources Information Center

    Hyslop, Alisha

    2009-01-01

    One of the biggest challenges facing the career and technical education (CTE) community as it works to implement the 2006 Perkins Act is responding to more rigorous requirements for reporting on CTE students' technical skill attainment. The U.S. Department of Education suggested in non-regulatory guidance that states and locals use the number of…

  2. SHARP's systems engineering challenge: rectifying integrated product team requirements with performance issues in an evolutionary spiral development acquisition

    NASA Astrophysics Data System (ADS)

    Kuehl, C. Stephen

    2003-08-01

    Completing its final development and early deployment on the Navy's multi-role aircraft, the F/A-18 E/F Super Hornet, the SHAred Reconnaissance Pod (SHARP) provides the war fighter with the latest digital tactical reconnaissance (TAC Recce) Electro-Optical/Infrared (EO/IR) sensor system. The SHARP program is an evolutionary acquisition that used a spiral development process across a prototype development phase tightly coupled into overlapping Engineering and Manufacturing Development (EMD) and Low Rate Initial Production (LRIP) phases. Under a tight budget environment with a highly compressed schedule, SHARP challenged traditional acquisition strategies and systems engineering (SE) processes. Adopting tailored state-of-the-art systems engineering process models allowd the SHARP program to overcome the technical knowledge transition challenges imposed by a compressed program schedule. The program's original goal was the deployment of digital TAC Recce mission capabilities to the fleet customer by summer of 2003. Hardware and software integration technical challenges resulted from requirements definition and analysis activities performed across a government-industry led Integrated Product Team (IPT) involving Navy engineering and test sites, Boeing, and RTSC-EPS (with its subcontracted hardware and government furnished equipment vendors). Requirements development from a bottoms-up approach was adopted using an electronic requirements capture environment to clarify and establish the SHARP EMD product baseline specifications as relevant technical data became available. Applying Earned-Value Management (EVM) against an Integrated Master Schedule (IMS) resulted in efficiently managing SE task assignments and product deliveries in a dynamically evolving customer requirements environment. Application of Six Sigma improvement methodologies resulted in the uncovering of root causes of errors in wiring interconnectivity drawings, pod manufacturing processes, and avionics

  3. A procedural skills OSCE: assessing technical and non-technical skills of internal medicine residents.

    PubMed

    Pugh, Debra; Hamstra, Stanley J; Wood, Timothy J; Humphrey-Murto, Susan; Touchie, Claire; Yudkowsky, Rachel; Bordage, Georges

    2015-03-01

    Internists are required to perform a number of procedures that require mastery of technical and non-technical skills, however, formal assessment of these skills is often lacking. The purpose of this study was to develop, implement, and gather validity evidence for a procedural skills objective structured clinical examination (PS-OSCE) for internal medicine (IM) residents to assess their technical and non-technical skills when performing procedures. Thirty-five first to third-year IM residents participated in a 5-station PS-OSCE, which combined partial task models, standardized patients, and allied health professionals. Formal blueprinting was performed and content experts were used to develop the cases and rating instruments. Examiners underwent a frame-of-reference training session to prepare them for their rater role. Scores were compared by levels of training, experience, and to evaluation data from a non-procedural OSCE (IM-OSCE). Reliability was calculated using Generalizability analyses. Reliabilities for the technical and non-technical scores were 0.68 and 0.76, respectively. Third-year residents scored significantly higher than first-year residents on the technical (73.5 vs. 62.2%) and non-technical (83.2 vs. 75.1%) components of the PS-OSCE (p < 0.05). Residents who had performed the procedures more frequently scored higher on three of the five stations (p < 0.05). There was a moderate disattenuated correlation (r = 0.77) between the IM-OSCE and the technical component of the PS-OSCE scores. The PS-OSCE is a feasible method for assessing multiple competencies related to performing procedures and this study provides validity evidence to support its use as an in-training examination.

  4. TECHNICAL MANPOWER IN NEW YORK STATE. VOLUME II.

    ERIC Educational Resources Information Center

    AMATULLI, ANGELO; AND OTHERS

    THE JOB CONTENT OF THE TECHNICAL OCCUPATIONS AND THE TECHNICAL SKILLS AND SUBJECT MATTER KNOWLEDGES REQUIRED ARE BASED PRIMARILY ON INFORMATION SUPPLIED BY EMPLOYERS FROM 17,414 ESTABLISHMENTS IN NEW YORK STATE. DATA ARE ALSO GIVEN ON GRADE STRUCTURE, EDUCATION AND EXPERIENCE REQUIREMENTS, TESTS AND LICENSES REQUIRED FOR THE JOB, SOURCES OF…

  5. Technical Assessment of Maglev System Concepts

    DTIC Science & Technology

    1998-10-01

    pressurizes the loop but retains sufficient heat capacity for the day’s cooling needs. Magneplane uses a cryorefrigerator to keep its supercritical helium in...comparative baselines. the technical and economic viability of maglev in * Apply this process to alternative U.S. maglev the U.S. and to recommend...output/joules- heat the same data as in Figure 119 with the aforemen- input). In effect, applying this factor implies that tioned efficiencies applied

  6. Technical Skill Attainment and Post-Program Outcomes: An Analysis of Pennsylvania Secondary Career and Technical Education Graduates

    ERIC Educational Resources Information Center

    Staklis, Sandra; Klein, Steven

    2010-01-01

    Since the mid-1990s, the Pennsylvania Department of Education (PDE) has required all students concentrating in career and technical education (CTE) programs to complete a standardized technical skill assessment at or near the end of their program. Results of technical skill assessments are used for a number of purposes, including recognizing…

  7. New Baseline Design of the ILC RTML System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Seletskiy, S.; Kapin, V. V.; Solyak, N.

    2012-05-01

    The new ILC baseline was proposed in 2009 (Strawman baseline - SB2009) to minimize cost of the machine and accommodate many changes made in the design of the accelerator systems. The biggest changes are made in the central area, where BDS, RTM L, DR, electron and positron sources are sharing the tunnels. A new layout of the compact DR and re-location of the electron and positron sources to the main tunnel requires a new lattice design for all beamlines in this area. The lattice design was coord inated between accelerator systems and Convention Facility and Siting (CFS) group to eliminatemore » conflicts between beamlines and satisfy construction requirements. In this paper we present a new design of the RTML electron and positron lattices in the centr al area and other modifications made in the RTML line to accommodate changes to the beamline layouts.« less

  8. 48 CFR 952.242-70 - Technical direction.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... (3) Reviewing and, where required by the contract, approving, technical reports, drawings... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Technical direction. 952... FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 952.242-70 Technical...

  9. 48 CFR 952.242-70 - Technical direction.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    .... (3) Reviewing and, where required by the contract, approving, technical reports, drawings... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Technical direction. 952... FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 952.242-70 Technical...

  10. 48 CFR 952.242-70 - Technical direction.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    .... (3) Reviewing and, where required by the contract, approving, technical reports, drawings... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Technical direction. 952... FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 952.242-70 Technical...

  11. 48 CFR 952.242-70 - Technical direction.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    .... (3) Reviewing and, where required by the contract, approving, technical reports, drawings... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Technical direction. 952... FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 952.242-70 Technical...

  12. A research review on clinical needs, technical requirements, and normativity in the design of surgical robots.

    PubMed

    Díaz, Carlos Eduardo; Fernández, Roemi; Armada, Manuel; García, Felipe

    2017-12-01

    Nowadays robots play an important role in society, mainly due to the significant benefits they provide when utilized for assisting human beings in the execution of dangerous or repetitive tasks. Medicine is one of the fields in which robots are gaining greater use and development, especially those employed in minimally invasive surgery (MIS). However, due to the particular conditions of the human body where robots have to act, the design of these systems is complex, not only from a technical point of view, but also because the clinical needs and the normativity aspects are important considerations that have to be taken into account in order to achieve better performances and more secure systems for patients and surgeons. Thus, this paper explores the clinical needs and the technical requirements that will trace the roadmap for the next scientific and technological advances in the field of robotic surgery, the metrics that should be defined for safe technology development and the standards that are being elaborated for boosting the industry and facilitating systems integration. Copyright © 2017 John Wiley & Sons, Ltd.

  13. Technical opportunities to reduce global anthropogenic emissions of nitrous oxide

    NASA Astrophysics Data System (ADS)

    Winiwarter, Wilfried; Höglund-Isaksson, Lena; Klimont, Zbigniew; Schöpp, Wolfgang; Amann, Markus

    2018-01-01

    We describe a consistent framework developed to quantify current and future anthropogenic emissions of nitrous oxide and the available technical abatement options by source sector for 172 regions globally. About 65% of the current emissions derive from agricultural soils, 8% from waste, and 4% from the chemical industry. Low-cost abatement options are available in industry, wastewater, and agriculture, where they are limited to large industrial farms. We estimate that by 2030, emissions can be reduced by about 6% ±2% applying abatement options at a cost lower than 10 €/t CO2-eq. The largest abatement potential at higher marginal costs is available from agricultural soils, employing precision fertilizer application technology as well as chemical treatment of fertilizers to suppress conversion processes in soil (nitrification inhibitors). At marginal costs of up to 100 €/t CO2-eq, about 18% ±6% of baseline emissions can be removed and when considering all available options, the global abatement potential increases to about 26% ±9%. Due to expected future increase in activities driving nitrous oxide emissions, the limited technical abatement potential available means that even at full implementation of reduction measures by 2030, global emissions can be at most stabilized at the pre-2010 level. In order to achieve deeper reductions in emissions, considerable technological development will be required as well as non-technical options like adjusting human diets towards moderate animal protein consumption.

  14. Getting Personal: Individuality, Innovation, and Technical Communication.

    ERIC Educational Resources Information Center

    Steiner, Carol J.

    1999-01-01

    Suggests that effective communication between technical and nontechnical people is difficult because technical communication lacks a personal dimension: technical people give up their identity to be considered competent. Argues that a different approach to communication education for scientists, engineers, and technologists is required to equip…

  15. The Interactive Electronic Technical Manual: Requirements, Current Status, and Implementation. Strategy Considerations.

    DTIC Science & Technology

    1991-07-01

    authoring systems. Concurrently, great strides in computer-aided design and computer-aided maintenance have contributed to this capability. 12 Junod ...J.; William A. Nugent; and L. John Junod . Plan for the Navy/Air Force Test of the Interactive Electronic Technical Manual (IETM) at Cecil Field...AFHRL Logistics and Human Factors Division, WPAFB. Aug 1990. 12. Junod , John L. PY90 Interactive Electronic Technical Manual (IETM) Portable Delivery

  16. Range Flight Safety Requirements

    NASA Technical Reports Server (NTRS)

    Loftin, Charles E.; Hudson, Sandra M.

    2018-01-01

    The purpose of this NASA Technical Standard is to provide the technical requirements for the NPR 8715.5, Range Flight Safety Program, in regards to protection of the public, the NASA workforce, and property as it pertains to risk analysis, Flight Safety Systems (FSS), and range flight operations. This standard is approved for use by NASA Headquarters and NASA Centers, including Component Facilities and Technical and Service Support Centers, and may be cited in contract, program, and other Agency documents as a technical requirement. This standard may also apply to the Jet Propulsion Laboratory or to other contractors, grant recipients, or parties to agreements to the extent specified or referenced in their contracts, grants, or agreements, when these organizations conduct or participate in missions that involve range flight operations as defined by NPR 8715.5.1.2.2 In this standard, all mandatory actions (i.e., requirements) are denoted by statements containing the term “shall.”1.3 TailoringTailoring of this standard for application to a specific program or project shall be formally documented as part of program or project requirements and approved by the responsible Technical Authority in accordance with NPR 8715.3, NASA General Safety Program Requirements.

  17. Development of U.S. Government General Technical Requirements for UAS Flight Safety Systems Utilizing the Iridium Satellite Constellation

    NASA Technical Reports Server (NTRS)

    Murray, Jennifer; Birr, Richard

    2010-01-01

    This slide presentation reviews the development of technical requirements for Unmanned Aircraft Systems (UAS) utilization of the Iridium Satellite Constellation to provide flight safety. The Federal Aviation Authority (FAA) required an over-the-horizon communication standard to guarantee flight safety before permitting widespread UAS flights in the National Air Space (NAS). This is important to ensure reliable control of UASs during loss-link and over-the-horizon scenarios. The core requirement was to utilize a satellite system to send GPS tracking data and other telemetry from a flight vehicle down to the ground. Iridium was chosen as the system because it is one of the only true satellite systems that has world wide coverage, and the service has a highly reliable link margin. The Iridium system, the flight modems, and the test flight are described.

  18. 7 CFR 653.3 - Adaptation of technical standards.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 6 2012-01-01 2012-01-01 false Adaptation of technical standards. 653.3 Section 653.3..., DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES TECHNICAL STANDARDS § 653.3 Adaptation of technical standards. Technical standards and criteria developed on a national basis may require special adaptation to meet local...

  19. 7 CFR 653.3 - Adaptation of technical standards.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 6 2014-01-01 2014-01-01 false Adaptation of technical standards. 653.3 Section 653.3..., DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES TECHNICAL STANDARDS § 653.3 Adaptation of technical standards. Technical standards and criteria developed on a national basis may require special adaptation to meet local...

  20. 7 CFR 653.3 - Adaptation of technical standards.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 6 2011-01-01 2011-01-01 false Adaptation of technical standards. 653.3 Section 653.3..., DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES TECHNICAL STANDARDS § 653.3 Adaptation of technical standards. Technical standards and criteria developed on a national basis may require special adaptation to meet local...

  1. 7 CFR 653.3 - Adaptation of technical standards.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 6 2013-01-01 2013-01-01 false Adaptation of technical standards. 653.3 Section 653.3..., DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES TECHNICAL STANDARDS § 653.3 Adaptation of technical standards. Technical standards and criteria developed on a national basis may require special adaptation to meet local...

  2. Summary of long-baseline systematics session at CETUP*2014

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cherdack, Daniel; Worcester, Elizabeth

    2015-10-15

    A session studying systematics in long-baseline neutrino oscillation physics was held July 14-18, 2014 as part of CETUP* 2014. Systematic effects from flux normalization and modeling, modeling of cross sections and nuclear interactions, and far detector effects were addressed. Experts presented the capabilities of existing and planned tools. A program of study to determine estimates of and requirements for the size of these effects was designed. This document summarizes the results of the CETUP* systematics workshop and the current status of systematic uncertainty studies in long-baseline neutrino oscillation measurements.

  3. NASA Scientific and Technical Publications: A Catalog of Special Publications, Reference Publications, Conference Publications, and Technical Papers 1991-1992

    DTIC Science & Technology

    1993-02-01

    Scientific and Technical Information EXOBIOLOGY. HEALTH. MICROBIOLOGY . MICROOR- System during September 1990. Subject coverage includes: GANISMS...Houston. TX N91-24731 National Aeronautics and Space Administration. MICROBIOLOGY ON SPACE STATION FREEDOM Washington, DCr DUANE L. PIERSON, ed...and solution INASA-SP-7011(345)) p 37 N91-16547 Beyond the Baseline 1991ý Proceedings of the Space [NASA-TP-3242) p 43 N92-33483 Microbiology on Space

  4. The role of non-technical skills in surgery

    PubMed Central

    Agha, Riaz A.; Fowler, Alexander J.; Sevdalis, Nick

    2015-01-01

    Non-technical skills are of increasing importance in surgery and surgical training. A traditional focus on technical skills acquisition and competence is no longer enough for the delivery of a modern, safe surgical practice. This review discusses the importance of non-technical skills and the values that underpin successful modern surgical practice. This narrative review used a number of sources including written and online, there was no specific search strategy of defined databases. Modern surgical practice requires; technical and non-technical skills, evidence-based practice, an emphasis on lifelong learning, monitoring of outcomes and a supportive institutional and health service framework. Finally these requirements need to be combined with a number of personal and professional values including integrity, professionalism and compassionate, patient-centred care. PMID:26904193

  5. School-to-Work Transition of Career and Technical Education Graduates

    ERIC Educational Resources Information Center

    Packard, Becky Wai-Ling; Leach, Miki; Ruiz, Yedalis; Nelson, Consuelo; DiCocco, Hannah

    2012-01-01

    This study analyzed the career development of career and technical education (CTE) high school graduates during their school-to-work transition, specifically their adaptability in the face of barriers. Forty graduates (22 men, 18 women) from working-class backgrounds participated in baseline surveys at graduation and phenomenological interviews 1…

  6. Adapting an Agent-Based Model of Socio-Technical Systems to Analyze Security Failures

    DTIC Science & Technology

    2016-10-17

    total number of non-blackouts differed from the total number in the baseline data to a statistically significant extent with a p- valueɘ.0003...the total number of non-blackouts differed from the total number in the baseline data to a statistically significant extent with a p-valueɘ.0003...I. Nikolic, and Z. Lukszo, Eds., Agent-based modelling of socio-technical systems. Springer Science & Business Media, 2013, vol. 9. [12] A. P. Shaw

  7. Approach for environmental baseline water sampling

    USGS Publications Warehouse

    Smith, K.S.

    2011-01-01

    Samples collected during the exploration phase of mining represent baseline conditions at the site. As such, they can be very important in forecasting potential environmental impacts should mining proceed, and can become measurements against which future changes are compared. Constituents in stream water draining mined and mineralized areas tend to be geochemically, spatially, and temporally variable, which presents challenges in collecting both exploration and baseline water-quality samples. Because short-term (daily) variations can complicate long-term trends, it is important to consider recent findings concerning geochemical variability of stream-water constituents at short-term timescales in designing sampling plans. Also, adequate water-quality information is key to forecasting potential ecological impacts from mining. Therefore, it is useful to collect baseline water samples adequate tor geochemical and toxicological modeling. This requires complete chemical analyses of dissolved constituents that include major and minor chemical elements as well as physicochemical properties (including pH, specific conductance, dissolved oxygen) and dissolved organic carbon. Applying chemical-equilibrium and appropriate toxicological models to water-quality information leads to an understanding of the speciation, transport, sequestration, bioavailability, and aquatic toxicity of potential contaminants. Insights gained from geochemical and toxicological modeling of water-quality data can be used to design appropriate mitigation and for economic planning for future mining activities.

  8. Baseline experiments in teleoperator control

    NASA Technical Reports Server (NTRS)

    Hankins, W. W., III; Mixon, R. W.

    1986-01-01

    Studies have been conducted at the NASA Langley Research Center (LaRC) to establish baseline human teleoperator interface data and to assess the influence of some of the interface parameters on human performance in teleoperation. As baseline data, the results will be used to assess future interface improvements resulting from this research in basic teleoperator human factors. In addition, the data have been used to validate LaRC's basic teleoperator hardware setup and to compare initial teleoperator study results. Four subjects controlled a modified industrial manipulator to perform a simple task involving both high and low precision. Two different schemes for controlling the manipulator were studied along with both direct and indirect viewing of the task. Performance of the task was measured as the length of time required to complete the task along with the number of errors made in the process. Analyses of variance were computed to determine the significance of the influences of each of the independent variables. Comparisons were also made between the LaRC data and data taken earlier by Grumman Aerospace Corp. at their facilities.

  9. SREM (Software Requirements Engineering Methodology) Evaluation. Volume 2. Specifications and Technical Data.

    DTIC Science & Technology

    1984-02-01

    and is approved for publication. APPROVED: ’"" " Project Engineer APPROVED:k 1 4 RAYMOND P. URTZ, JR. Acting Technical Director Command and Control ...Technical Director Command and Control Division FOR THE COMMANDER: JOHN A. RITZ Acting Chief, Plans Office If your address has changed or if you wish to be...179 55812203 Denver CO 80201 55812203 I. CONTROLLING OFFICE NAME AND ADDRESS 12. REPORT DATE Rome Air Development Center (COEE) February 1984 Griffiss

  10. SAM Technical Contacts

    EPA Pesticide Factsheets

    These technical contacts are available to help with questions regarding method deviations, modifications, sample problems or interferences, quality control requirements, the use of alternative methods, or the need to address analytes or sample types.

  11. Technical Education and Resource Material.

    ERIC Educational Resources Information Center

    Mills, Marie T.

    New approaches and many technical innovations will be required by the junior college to meet the increasing educational needs of technical occupations. A first is information on which the prospective student can base an intelligent choice of occupation. For this he must have a precise job description to determine whether the career fits his…

  12. 48 CFR 35.010 - Scientific and technical reports.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.010 Scientific and technical reports. (a) R&D contracts shall require contractors to furnish scientific and technical reports... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Scientific and technical...

  13. 48 CFR 35.010 - Scientific and technical reports.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.010 Scientific and technical reports. (a) R&D contracts shall require contractors to furnish scientific and technical reports... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Scientific and technical...

  14. 48 CFR 35.010 - Scientific and technical reports.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Scientific and technical... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.010 Scientific and technical reports. (a) R&D contracts shall require contractors to furnish scientific and technical reports...

  15. 48 CFR 35.010 - Scientific and technical reports.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Scientific and technical... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.010 Scientific and technical reports. (a) R&D contracts shall require contractors to furnish scientific and technical reports...

  16. 48 CFR 35.010 - Scientific and technical reports.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Scientific and technical... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.010 Scientific and technical reports. (a) R&D contracts shall require contractors to furnish scientific and technical reports...

  17. NetView technical research

    NASA Technical Reports Server (NTRS)

    1993-01-01

    This is the Final Technical Report for the NetView Technical Research task. This report is prepared in accordance with Contract Data Requirements List (CDRL) item A002. NetView assistance was provided and details are presented under the following headings: NetView Management Systems (NMS) project tasks; WBAFB IBM 3090; WPAFB AMDAHL; WPAFB IBM 3084; Hill AFB; McClellan AFB AMDAHL; McClellan AFB IBM 3090; and Warner-Robins AFB.

  18. Study of space shuttle orbiter system management computer function. Volume 1: Analysis, baseline design

    NASA Technical Reports Server (NTRS)

    1975-01-01

    A system analysis of the shuttle orbiter baseline system management (SM) computer function is performed. This analysis results in an alternative SM design which is also described. The alternative design exhibits several improvements over the baseline, some of which are increased crew usability, improved flexibility, and improved growth potential. The analysis consists of two parts: an application assessment and an implementation assessment. The former is concerned with the SM user needs and design functional aspects. The latter is concerned with design flexibility, reliability, growth potential, and technical risk. The system analysis is supported by several topical investigations. These include: treatment of false alarms, treatment of off-line items, significant interface parameters, and a design evaluation checklist. An in-depth formulation of techniques, concepts, and guidelines for design of automated performance verification is discussed.

  19. Measures of Success: A Survey of Selected Vocational and Technical Education Programs in Florida which Train Students in Occupations Requiring Licenses.

    ERIC Educational Resources Information Center

    Florida State Advisory Council on Vocational and Technical Education, Tallahassee.

    A study of 13 vocational and technical education programs in Florida was conducted which represented an attempt to identify valid and reliable sources of data whereby some vocational programs might be evaluated in specified terms of effectiveness. The programs selected for study were among those which require graduating students to pass licensing…

  20. International data transfer for space very long baseline interferometry

    NASA Technical Reports Server (NTRS)

    Wiercigroch, Alexandria B.

    1994-01-01

    Space very long baseline interferometry (SVLBI) experiments using a TDRSS satellite have successfully demonstrated the capability of using spacecraft to extend the effective baseline length of VLBI observations beyond the diameter of the Earth, thereby improving the resolution for imaging of active galactic nuclei at centimeter wavelengths. As a result, two spacecraft dedicated to SVLBI, VSOP (Japan) and RadioAstron (Russia), are scheduled to be launched into high Earth orbit in 1996 and 1997. The success of these missions depends on the cooperation of the international community in providing support from ground tracking stations, ground radio telescopes, and correlation facilities. The timely exchange and monitoring of data among the participants requires a well-designed and automated international data transfer system. In this paper, we will discuss the design requirements, data types and flows, and the operational responsibilities associated with the SVLBI data transfer system.

  1. 48 CFR 811.103-70 - Technical industry standards.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Technical industry... Documents 811.103-70 Technical industry standards. Where items are required to conform to technical industry... organizations, where such standards are generally recognized and accepted in the industry involved, the...

  2. 48 CFR 811.103-70 - Technical industry standards.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Technical industry... Documents 811.103-70 Technical industry standards. Where items are required to conform to technical industry... organizations, where such standards are generally recognized and accepted in the industry involved, the...

  3. 48 CFR 811.103-70 - Technical industry standards.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Technical industry... Documents 811.103-70 Technical industry standards. Where items are required to conform to technical industry... organizations, where such standards are generally recognized and accepted in the industry involved, the...

  4. 48 CFR 811.103-70 - Technical industry standards.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Technical industry... Documents 811.103-70 Technical industry standards. Where items are required to conform to technical industry... organizations, where such standards are generally recognized and accepted in the industry involved, the...

  5. 48 CFR 935.010 - Scientific and technical reports.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... information. The DOE Order 241.1B Scientific and Technical Information Management, or its successor version... conveyed in scientific and technical information (STI) shall include an instruction requiring the.... Department of Energy (DOE), Office of Scientific and Technical Information (OSTI), using the DOE Energy Link...

  6. 48 CFR 935.010 - Scientific and technical reports.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... information. The DOE Order 241.1B Scientific and Technical Information Management, or its successor version... conveyed in scientific and technical information (STI) shall include an instruction requiring the.... Department of Energy (DOE), Office of Scientific and Technical Information (OSTI), using the DOE Energy Link...

  7. 48 CFR 935.010 - Scientific and technical reports.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... information. The DOE Order 241.1B Scientific and Technical Information Management, or its successor version... conveyed in scientific and technical information (STI) shall include an instruction requiring the.... Department of Energy (DOE), Office of Scientific and Technical Information (OSTI), using the DOE Energy Link...

  8. 48 CFR 935.010 - Scientific and technical reports.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... information. The DOE Order 241.1B Scientific and Technical Information Management, or its successor version... conveyed in scientific and technical information (STI) shall include an instruction requiring the.... Department of Energy (DOE), Office of Scientific and Technical Information (OSTI), using the DOE Energy Link...

  9. 48 CFR 935.010 - Scientific and technical reports.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... information. The DOE Order 241.1B Scientific and Technical Information Management, or its successor version... conveyed in scientific and technical information (STI) shall include an instruction requiring the.... Department of Energy (DOE), Office of Scientific and Technical Information (OSTI), using the DOE Energy Link...

  10. 42 CFR 493.1411 - Standard; Technical consultant qualifications.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... training or experience to provide technical consultation for each of the specialties and subspecialties of... responsible. Note: The technical consultant requirements for “laboratory training or experience, or both” in... 42 Public Health 5 2010-10-01 2010-10-01 false Standard; Technical consultant qualifications. 493...

  11. 48 CFR 852.211-72 - Technical industry standards.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Technical industry....211-72 Technical industry standards. As prescribed in 811.103-70, insert the following provision: Technical Industry Standards (JAN 2008) The supplies or equipment required by this invitation for bid or...

  12. 48 CFR 852.211-72 - Technical industry standards.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Technical industry....211-72 Technical industry standards. As prescribed in 811.103-70, insert the following provision: Technical Industry Standards (JAN 2008) The supplies or equipment required by this invitation for bid or...

  13. 48 CFR 852.211-72 - Technical industry standards.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Technical industry....211-72 Technical industry standards. As prescribed in 811.103-70, insert the following provision: Technical Industry Standards (JAN 2008) The supplies or equipment required by this invitation for bid or...

  14. 48 CFR 852.211-72 - Technical industry standards.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Technical industry....211-72 Technical industry standards. As prescribed in 811.103-70, insert the following provision: Technical Industry Standards (JAN 2008) The supplies or equipment required by this invitation for bid or...

  15. 48 CFR 852.211-72 - Technical industry standards.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Technical industry....211-72 Technical industry standards. As prescribed in 811.103-70, insert the following provision: Technical Industry Standards (JAN 2008) The supplies or equipment required by this invitation for bid or...

  16. 13 CFR 306.2 - Award requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... TRAINING, RESEARCH AND TECHNICAL ASSISTANCE INVESTMENTS Local and National Technical Assistance § 306.2 Award requirements. EDA selects Projects for Local and National Technical Assistance Investments in...

  17. 76 FR 80226 - Technical Amendments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-23

    ... final rule, effective upon publication. Generally, the Administrative Procedure Act (APA) requires a.... Additionally, the APA requires that a final rule must have a delayed effective date of 30 days from the date of... delayed effective date requirement under the APA. 5 U.S.C. 553(d)(3). Again the technical change conforms...

  18. 25 CFR 23.42 - Technical assistance.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Technical assistance. 23.42 Section 23.42 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR HUMAN SERVICES INDIAN CHILD WELFARE ACT General and Uniform Grant Administration Provisions and Requirements § 23.42 Technical assistance. (a) Pre-award and...

  19. C P -invariance violation at short-baseline experiments in 3 +1 neutrino scenarios

    NASA Astrophysics Data System (ADS)

    de Gouvêa, André; Kelly, Kevin J.; Kobach, Andrew

    2015-03-01

    New neutrino degrees of freedom allow for more sources of charge parity- (C P ) invariance violation (CPV). We explore the requirements for accessing C P -odd mixing parameters in the so-called 3 +1 scenario, where one assumes the existence of one extra, mostly sterile neutrino degree of freedom, heavier than the other three mass eigenstates. As a first step, we concentrate on the νe→νμ appearance channel in a hypothetical, upgraded version of the ν STORM proposal. We establish that the optimal baseline for CPV studies depends strongly on the value of Δ m142—the new mass-squared difference—and that the ability to observe CPV depends significantly on whether the experiment is performed at the optimal baseline. Even at the optimal baseline, it is very challenging to see CPV in 3 +1 scenarios if one considers only one appearance channel. Full exploration of CPV in short-baseline experiments will require precision measurements of tau appearance, a challenge significantly beyond what is currently being explored by the experimental neutrino community.

  20. 16 CFR 1401.5 - Providing performance and technical data to purchasers by labeling.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 16 Commercial Practices 2 2014-01-01 2014-01-01 false Providing performance and technical data to...: REQUIREMENTS TO PROVIDE THE COMMISSION WITH PERFORMANCE AND TECHNICAL DATA; REQUIREMENTS TO NOTIFY CONSUMERS AT POINT OF PURCHASE OF PERFORMANCE AND TECHNICAL DATA § 1401.5 Providing performance and technical data to...

  1. 16 CFR 1401.5 - Providing performance and technical data to purchasers by labeling.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 16 Commercial Practices 2 2012-01-01 2012-01-01 false Providing performance and technical data to...: REQUIREMENTS TO PROVIDE THE COMMISSION WITH PERFORMANCE AND TECHNICAL DATA; REQUIREMENTS TO NOTIFY CONSUMERS AT POINT OF PURCHASE OF PERFORMANCE AND TECHNICAL DATA § 1401.5 Providing performance and technical data to...

  2. 16 CFR 1401.5 - Providing performance and technical data to purchasers by labeling.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 16 Commercial Practices 2 2011-01-01 2011-01-01 false Providing performance and technical data to...: REQUIREMENTS TO PROVIDE THE COMMISSION WITH PERFORMANCE AND TECHNICAL DATA; REQUIREMENTS TO NOTIFY CONSUMERS AT POINT OF PURCHASE OF PERFORMANCE AND TECHNICAL DATA § 1401.5 Providing performance and technical data to...

  3. 16 CFR 1401.5 - Providing performance and technical data to purchasers by labeling.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Providing performance and technical data to...: REQUIREMENTS TO PROVIDE THE COMMISSION WITH PERFORMANCE AND TECHNICAL DATA; REQUIREMENTS TO NOTIFY CONSUMERS AT POINT OF PURCHASE OF PERFORMANCE AND TECHNICAL DATA § 1401.5 Providing performance and technical data to...

  4. Network Design in Close-Range Photogrammetry with Short Baseline Images

    NASA Astrophysics Data System (ADS)

    Barazzetti, L.

    2017-08-01

    The avaibility of automated software for image-based 3D modelling has changed the way people acquire images for photogrammetric applications. Short baseline images are required to match image points with SIFT-like algorithms, obtaining more images than those necessary for "old fashioned" photogrammetric projects based on manual measurements. This paper describes some considerations on network design for short baseline image sequences, especially on precision and reliability of bundle adjustment. Simulated results reveal that the large number of 3D points used for image orientation has very limited impact on network precision.

  5. Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    GRYGIEL, M.L.

    1998-10-08

    Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baselinemore » and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system.« less

  6. 40 CFR 80.915 - How are the baseline toxics value and baseline toxics volume determined?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false How are the baseline toxics value and... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) REGULATION OF FUELS AND FUEL ADDITIVES Gasoline Toxics Baseline Determination § 80.915 How are the baseline toxics value and baseline toxics volume determined? (a...

  7. 40 CFR 80.915 - How are the baseline toxics value and baseline toxics volume determined?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 16 2011-07-01 2011-07-01 false How are the baseline toxics value and... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) REGULATION OF FUELS AND FUEL ADDITIVES Gasoline Toxics Baseline Determination § 80.915 How are the baseline toxics value and baseline toxics volume determined? (a...

  8. White Paper: Landscape on Technical and Conceptual Requirements and Competence Framework in Drug/Disease Modeling and Simulation

    PubMed Central

    Vlasakakis, G; Comets, E; Keunecke, A; Gueorguieva, I; Magni, P; Terranova, N; Della Pasqua, O; de Lange, E C; Kloft, C

    2013-01-01

    Pharmaceutical sciences experts and regulators acknowledge that pharmaceutical development as well as drug usage requires more than scientific advancements to cope with current attrition rates/therapeutic failures. Drug disease modeling and simulation (DDM&S) creates a paradigm to enable an integrated and higher-level understanding of drugs, (diseased)systems, and their interactions (systems pharmacology) through mathematical/statistical models (pharmacometrics)1—hence facilitating decision making during drug development and therapeutic usage of medicines. To identify gaps and challenges in DDM&S, an inventory of skills and competencies currently available in academia, industry, and clinical practice was obtained through survey. The survey outcomes revealed benefits, weaknesses, and hurdles for the implementation of DDM&S. In addition, the survey indicated that no consensus exists about the knowledge, skills, and attributes required to perform DDM&S activities effectively. Hence, a landscape of technical and conceptual requirements for DDM&S was identified and serves as a basis for developing a framework of competencies to guide future education and training in DDM&S. PMID:23887723

  9. 9 CFR 351.17 - Identification required.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.17 Identification required. Certified technical animal fats... certified plants shall be accompanied by MP Form 85 (Declaration to Accompany Technical Animal Fats Between...

  10. 9 CFR 351.17 - Identification required.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.17 Identification required. Certified technical animal fats... certified plants shall be accompanied by MP Form 85 (Declaration to Accompany Technical Animal Fats Between...

  11. 9 CFR 351.17 - Identification required.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.17 Identification required. Certified technical animal fats... certified plants shall be accompanied by MP Form 85 (Declaration to Accompany Technical Animal Fats Between...

  12. 9 CFR 351.17 - Identification required.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.17 Identification required. Certified technical animal fats... certified plants shall be accompanied by MP Form 85 (Declaration to Accompany Technical Animal Fats Between...

  13. 9 CFR 351.17 - Identification required.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.17 Identification required. Certified technical animal fats... certified plants shall be accompanied by MP Form 85 (Declaration to Accompany Technical Animal Fats Between...

  14. U-10Mo Baseline Fuel Fabrication Process Description

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hubbard, Lance R.; Arendt, Christina L.; Dye, Daniel F.

    This document provides a description of the U.S. High Power Research Reactor (USHPRR) low-enriched uranium (LEU) fuel fabrication process. This document is intended to be used in conjunction with the baseline process flow diagram (PFD) presented in Appendix A. The baseline PFD is used to document the fabrication process, communicate gaps in technology or manufacturing capabilities, convey alternatives under consideration, and as the basis for a dynamic simulation model of the fabrication process. The simulation model allows for the assessment of production rates, costs, and manufacturing requirements (manpower, fabrication space, numbers and types of equipment, etc.) throughout the lifecycle ofmore » the USHPRR program. This document, along with the accompanying PFD, is updated regularly« less

  15. Development of a general baseline toxicity QSAR model for the fish embryo acute toxicity test.

    PubMed

    Klüver, Nils; Vogs, Carolina; Altenburger, Rolf; Escher, Beate I; Scholz, Stefan

    2016-12-01

    Fish embryos have become a popular model in ecotoxicology and toxicology. The fish embryo acute toxicity test (FET) with the zebrafish embryo was recently adopted by the OECD as technical guideline TG 236 and a large database of concentrations causing 50% lethality (LC 50 ) is available in the literature. Quantitative Structure-Activity Relationships (QSARs) of baseline toxicity (also called narcosis) are helpful to estimate the minimum toxicity of chemicals to be tested and to identify excess toxicity in existing data sets. Here, we analyzed an existing fish embryo toxicity database and established a QSAR for fish embryo LC 50 using chemicals that were independently classified to act according to the non-specific mode of action of baseline toxicity. The octanol-water partition coefficient K ow is commonly applied to discriminate between non-polar and polar narcotics. Replacing the K ow by the liposome-water partition coefficient K lipw yielded a common QSAR for polar and non-polar baseline toxicants. This developed baseline toxicity QSAR was applied to compare the final mode of action (MOA) assignment of 132 chemicals. Further, we included the analysis of internal lethal concentration (ILC 50 ) and chemical activity (La 50 ) as complementary approaches to evaluate the robustness of the FET baseline toxicity. The analysis of the FET dataset revealed that specifically acting and reactive chemicals converged towards the baseline toxicity QSAR with increasing hydrophobicity. The developed FET baseline toxicity QSAR can be used to identify specifically acting or reactive compounds by determination of the toxic ratio and in combination with appropriate endpoints to infer the MOA for chemicals. Copyright © 2016 Elsevier Ltd. All rights reserved.

  16. 2017 Annual Technology Baseline (ATB): Cost and Performance Data for Electricity Generation Technologies

    DOE Data Explorer

    Hand, Maureen; Augustine, Chad; Feldman, David; Kurup, Parthiv; Beiter, Philipp; O'Connor, Patrick

    2017-08-21

    Each year since 2015, NREL has presented Annual Technology Baseline (ATB) in a spreadsheet that contains detailed cost and performance data (both current and projected) for renewable and conventional technologies. The spreadsheet includes a workbook for each technology. This spreadsheet provides data for the 2017 ATB. In this edition of the ATB, offshore wind power has been updated to include 15 technical resource groups. And, two options are now provided for representing market conditions for project financing, including current market conditions and long-term historical conditions. For more information, see https://atb.nrel.gov/.

  17. 30 CFR 777.13 - Reporting of technical data.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... descriptions of the methodology used to collect and analyze the data. (b) Technical analyses shall be planned... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Reporting of technical data. 777.13 Section 777... PROGRAMS GENERAL CONTENT REQUIREMENTS FOR PERMIT APPLICATIONS § 777.13 Reporting of technical data. (a) All...

  18. Classification of baseline toxicants for QSAR predictions to replace fish acute toxicity studies.

    PubMed

    Nendza, Monika; Müller, Martin; Wenzel, Andrea

    2017-03-22

    Fish acute toxicity studies are required for environmental hazard and risk assessment of chemicals by national and international legislations such as REACH, the regulations of plant protection products and biocidal products, or the GHS (globally harmonised system) for classification and labelling of chemicals. Alternative methods like QSARs (quantitative structure-activity relationships) can replace many ecotoxicity tests. However, complete substitution of in vivo animal tests by in silico methods may not be realistic. For the so-called baseline toxicants, it is possible to predict the fish acute toxicity with sufficient accuracy from log K ow and, hence, valid QSARs can replace in vivo testing. In contrast, excess toxicants and chemicals not reliably classified as baseline toxicants require further in silico, in vitro or in vivo assessments. Thus, the critical task is to discriminate between baseline and excess toxicants. For fish acute toxicity, we derived a scheme based on structural alerts and physicochemical property thresholds to classify chemicals as either baseline toxicants (=predictable by QSARs) or as potential excess toxicants (=not predictable by baseline QSARs). The step-wise approach identifies baseline toxicants (true negatives) in a precautionary way to avoid false negative predictions. Therefore, a certain fraction of false positives can be tolerated, i.e. baseline toxicants without specific effects that may be tested instead of predicted. Application of the classification scheme to a new heterogeneous dataset for diverse fish species results in 40% baseline toxicants, 24% excess toxicants and 36% compounds not classified. Thus, we can conclude that replacing about half of the fish acute toxicity tests by QSAR predictions is realistic to be achieved in the short-term. The long-term goals are classification criteria also for further groups of toxicants and to replace as many in vivo fish acute toxicity tests as possible with valid QSAR

  19. Long-Baseline Neutrino Facility (LBNF) and Deep Underground Neutrino Experiment (DUNE): Conceptual Design Report. Volume 3: Long-Baseline Neutrino Facility for DUNE

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Strait, James; McCluskey, Elaine; Lundin, Tracy

    2016-01-21

    This volume of the LBNF/DUNE Conceptual Design Report covers the Long-Baseline Neutrino Facility for DUNE and describes the LBNF Project, which includes design and construction of the beamline at Fermilab, the conventional facilities at both Fermilab and SURF, and the cryostat and cryogenics infrastructure required for the DUNE far detector.

  20. A Summary of Technical Problems Associated With Broadband Cable Teleservices Development. A Survey of Technical Requirements for Broadband Cable Teleservices; Volume One.

    ERIC Educational Resources Information Center

    McManamon, P. M.; Utlaut, W. F.

    The results of a survey of cable television (CATV) and related technological industries are summarized. In this, the first of a series of seven reports, attention is focused upon some major technical factors which need to be considered in order that a transition from the technical state of today's cable television and services to new teleservices…

  1. OSH technical reference manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-11-01

    In an evaluation of the Department of Energy (DOE) Occupational Safety and Health programs for government-owned contractor-operated (GOCO) activities, the Department of Labor`s Occupational Safety and Health Administration (OSHA) recommended a technical information exchange program. The intent was to share written safety and health programs, plans, training manuals, and materials within the entire DOE community. The OSH Technical Reference (OTR) helps support the secretary`s response to the OSHA finding by providing a one-stop resource and referral for technical information that relates to safe operations and practice. It also serves as a technical information exchange tool to reference DOE-wide materials pertinentmore » to specific safety topics and, with some modification, as a training aid. The OTR bridges the gap between general safety documents and very specific requirements documents. It is tailored to the DOE community and incorporates DOE field experience.« less

  2. Technical assessment of maglev system concepts. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lever, J.H.

    1998-10-01

    The Government Maglev System Assessment Team operated from 1991 to 1993 as part of the National Maglev Initiative. They assessed the technical viability of four US Maglev system concepts, using the French TGV high speed train and the German TR07 Maglev system as assessment baselines. Maglev in general offers advantages that include high speed potential, excellent system control, high capacity, low energy consumption, low maintenance, modest land requirements, low operating costs, and ability to meet a variety of transportation missions. Further, the US Maglev concepts could provide superior performance to TR07 for similar cost or similar performance for less cost.more » They also could achieve both lower trip times and lower energy consumption along typical US routes. These advantages result generally from the use of large gap magnetic suspensions, more powerful linear synchronous motors and tilting vehicles. Innovative concepts for motors, guideways, suspension, and superconducting magnets all contribute to a potential for superior long term performance of US Maglev systems compared with TGV and TR07.« less

  3. Do technical skills correlate with non-technical skills in crisis resource management: a simulation study.

    PubMed

    Riem, N; Boet, S; Bould, M D; Tavares, W; Naik, V N

    2012-11-01

    Both technical skills (TS) and non-technical skills (NTS) are key to ensuring patient safety in acute care practice and effective crisis management. These skills are often taught and assessed separately. We hypothesized that TS and NTS are not independent of each other, and we aimed to evaluate the relationship between TS and NTS during a simulated intraoperative crisis scenario. This study was a retrospective analysis of performances from a previously published work. After institutional ethics approval, 50 anaesthesiology residents managed a simulated crisis scenario of an intraoperative cardiac arrest secondary to a malignant arrhythmia. We used a modified Delphi approach to design a TS checklist, specific for the management of a malignant arrhythmia requiring defibrillation. All scenarios were recorded. Each performance was analysed by four independent experts. For each performance, two experts independently rated the technical performance using the TS checklist, and two other experts independently rated NTS using the Anaesthetists' Non-Technical Skills score. TS and NTS were significantly correlated to each other (r=0.45, P<0.05). During a simulated 5 min resuscitation requiring crisis resource management, our results indicate that TS and NTS are related to one another. This research provides the basis for future studies evaluating the nature of this relationship, the influence of NTS training on the performance of TS, and to determine whether NTS are generic and transferrable between crises that require different TS.

  4. Emergency Response Capability Baseline Needs Assessment Compliance Assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sharry, John A.

    2013-09-16

    This document is the second of a two-part analysis of Emergency Response Capabilities of Lawrence Livermore National Laboratory. The first part, 2013 Baseline Needs Assessment Requirements Document established the minimum performance criteria necessary to meet mandatory requirements. This second part analyses the performance of Lawrence Livermore Laboratory Emergency Management Department to the contents of the Requirements Document. The document was prepared based on an extensive review of information contained in the 2009 BNA, the 2012 BNA document, a review of Emergency Planning Hazards Assessments, a review of building construction, occupancy, fire protection features, dispatch records, LLNL alarm system records, firemore » department training records, and fire department policies and procedures.« less

  5. Artwork as Technics

    ERIC Educational Resources Information Center

    Jackson, Mark

    2016-01-01

    "Artwork as technics" opens discussion on activating aesthetics in educational contexts by arguing that we require some fundamental revision in understanding relations between aesthetics and technology in contexts where education is primarily encountered instrumentally and technologically. The paper addresses this through the writing of…

  6. The baseline pressure of intracranial pressure (ICP) sensors can be altered by electrostatic discharges.

    PubMed

    Eide, Per K; Bakken, André

    2011-08-22

    The monitoring of intracranial pressure (ICP) has a crucial role in the surveillance of patients with brain injury. During long-term monitoring of ICP, we have seen spontaneous shifts in baseline pressure (ICP sensor zero point), which are of technical and not physiological origin. The aim of the present study was to explore whether or not baseline pressures of ICP sensors can be affected by electrostatics discharges (ESD's), when ESD's are delivered at clinically relevant magnitudes. We performed bench-testing of a set of commercial ICP sensors. In our experimental setup, the ICP sensor was placed in a container with 0.9% NaCl solution. A test person was charged 0.5-10 kV, and then delivered ESD's to the sensor by touching a metal rod that was located in the container. The continuous pressure signals were recorded continuously before/after the ESD's, and the pressure readings were stored digitally using a computerized system A total of 57 sensors were tested, including 25 Codman ICP sensors and 32 Raumedic sensors. When charging the test person in the range 0.5-10 kV, typically ESD's in the range 0.5-5 kV peak pulse were delivered to the ICP sensor. Alterations in baseline pressure ≥ 2 mmHg was seen in 24 of 25 (96%) Codman sensors and in 17 of 32 (53%) Raumedic sensors. Lasting changes in baseline pressure > 10 mmHg that in the clinical setting would affect patient management, were seen frequently for both sensor types. The changes in baseline pressure were either characterized by sudden shifts or gradual drifts in baseline pressure. The baseline pressures of commercial solid ICP sensors can be altered by ESD's at discharge magnitudes that are clinically relevant. Shifts in baseline pressure change the ICP levels visualised to the physician on the monitor screen, and thereby reveal wrong ICP values, which likely represent a severe risk to the patient.

  7. The baseline pressure of intracranial pressure (ICP) sensors can be altered by electrostatic discharges

    PubMed Central

    2011-01-01

    Background The monitoring of intracranial pressure (ICP) has a crucial role in the surveillance of patients with brain injury. During long-term monitoring of ICP, we have seen spontaneous shifts in baseline pressure (ICP sensor zero point), which are of technical and not physiological origin. The aim of the present study was to explore whether or not baseline pressures of ICP sensors can be affected by electrostatics discharges (ESD's), when ESD's are delivered at clinically relevant magnitudes. Methods We performed bench-testing of a set of commercial ICP sensors. In our experimental setup, the ICP sensor was placed in a container with 0.9% NaCl solution. A test person was charged 0.5 - 10 kV, and then delivered ESD's to the sensor by touching a metal rod that was located in the container. The continuous pressure signals were recorded continuously before/after the ESD's, and the pressure readings were stored digitally using a computerized system Results A total of 57 sensors were tested, including 25 Codman ICP sensors and 32 Raumedic sensors. When charging the test person in the range 0.5-10 kV, typically ESD's in the range 0.5 - 5 kV peak pulse were delivered to the ICP sensor. Alterations in baseline pressure ≥ 2 mmHg was seen in 24 of 25 (96%) Codman sensors and in 17 of 32 (53%) Raumedic sensors. Lasting changes in baseline pressure > 10 mmHg that in the clinical setting would affect patient management, were seen frequently for both sensor types. The changes in baseline pressure were either characterized by sudden shifts or gradual drifts in baseline pressure. Conclusions The baseline pressures of commercial solid ICP sensors can be altered by ESD's at discharge magnitudes that are clinically relevant. Shifts in baseline pressure change the ICP levels visualised to the physician on the monitor screen, and thereby reveal wrong ICP values, which likely represent a severe risk to the patient. PMID:21859487

  8. 19 CFR 115.51 - Technical requirements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS CONVENTIONS... submitted for inspection for individual approval must comply with the requirements of Annex 2 of the Customs...

  9. 19 CFR 115.51 - Technical requirements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS CONVENTIONS... submitted for inspection for individual approval must comply with the requirements of Annex 2 of the Customs...

  10. 19 CFR 115.51 - Technical requirements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS CONVENTIONS... submitted for inspection for individual approval must comply with the requirements of Annex 2 of the Customs...

  11. 19 CFR 115.51 - Technical requirements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS CONVENTIONS... submitted for inspection for individual approval must comply with the requirements of Annex 2 of the Customs...

  12. 19 CFR 115.51 - Technical requirements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS CONVENTIONS... submitted for inspection for individual approval must comply with the requirements of Annex 2 of the Customs...

  13. 16 CFR § 1401.5 - Providing performance and technical data to purchasers by labeling.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 16 Commercial Practices 2 2013-01-01 2013-01-01 false Providing performance and technical data to...: REQUIREMENTS TO PROVIDE THE COMMISSION WITH PERFORMANCE AND TECHNICAL DATA; REQUIREMENTS TO NOTIFY CONSUMERS AT POINT OF PURCHASE OF PERFORMANCE AND TECHNICAL DATA § 1401.5 Providing performance and technical data to...

  14. ERLN Technical Support for Labs

    EPA Pesticide Factsheets

    The Environmental Response Laboratory Network provides policies and guidance on lab and data requirements, Standardized Analytical Methods, and technical support for water and radiological sampling and analysis

  15. Leveraging probabilistic peak detection to estimate baseline drift in complex chromatographic samples.

    PubMed

    Lopatka, Martin; Barcaru, Andrei; Sjerps, Marjan J; Vivó-Truyols, Gabriel

    2016-01-29

    Accurate analysis of chromatographic data often requires the removal of baseline drift. A frequently employed strategy strives to determine asymmetric weights in order to fit a baseline model by regression. Unfortunately, chromatograms characterized by a very high peak saturation pose a significant challenge to such algorithms. In addition, a low signal-to-noise ratio (i.e. s/n<40) also adversely affects accurate baseline correction by asymmetrically weighted regression. We present a baseline estimation method that leverages a probabilistic peak detection algorithm. A posterior probability of being affected by a peak is computed for each point in the chromatogram, leading to a set of weights that allow non-iterative calculation of a baseline estimate. For extremely saturated chromatograms, the peak weighted (PW) method demonstrates notable improvement compared to the other methods examined. However, in chromatograms characterized by low-noise and well-resolved peaks, the asymmetric least squares (ALS) and the more sophisticated Mixture Model (MM) approaches achieve superior results in significantly less time. We evaluate the performance of these three baseline correction methods over a range of chromatographic conditions to demonstrate the cases in which each method is most appropriate. Copyright © 2016 Elsevier B.V. All rights reserved.

  16. 13 CFR 306.2 - Award requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 306.2 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE TRAINING, RESEARCH AND TECHNICAL ASSISTANCE INVESTMENTS Local and National Technical Assistance § 306.2 Award requirements. EDA selects Projects for Local and National Technical Assistance Investments in...

  17. 13 CFR 306.2 - Award requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 306.2 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE TRAINING, RESEARCH AND TECHNICAL ASSISTANCE INVESTMENTS Local and National Technical Assistance § 306.2 Award requirements. EDA selects Projects for Local and National Technical Assistance Investments in...

  18. 13 CFR 306.2 - Award requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 306.2 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE TRAINING, RESEARCH AND TECHNICAL ASSISTANCE INVESTMENTS Local and National Technical Assistance § 306.2 Award requirements. EDA selects Projects for Local and National Technical Assistance Investments in...

  19. 13 CFR 306.2 - Award requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 306.2 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE TRAINING, RESEARCH AND TECHNICAL ASSISTANCE INVESTMENTS Local and National Technical Assistance § 306.2 Award requirements. EDA selects Projects for Local and National Technical Assistance Investments in...

  20. CryoSat SAR/SARin Level1b products: assessment of BaselineC and improvements towards BaselineD

    NASA Astrophysics Data System (ADS)

    Scagliola, Michele; Fornari, Marco; Bouffard, Jerome; Parrinello, Tommaso

    2017-04-01

    CryoSat was launched on the 8th April 2010 and is the first European ice mission dedicated to the monitoring of precise changes in the thickness of polar ice sheets and floating sea ice. Cryosat carries an innovative radar altimeter called the Synthetic Aperture Interferometric Altimeter (SIRAL), that transmits pulses at a high pulse repetition frequency thus making the received echoes phase coherent and suitable for azimuth processing. This allows to reach a significantly improved along track resolution with respect to traditional pulse-width limited altimeters. CryoSat is the first altimetry mission operating in SAR mode and continuous improvements in the Level1 Instrument Processing Facility (IPF1) are being identified, tested and validated in order to improve the quality of the Level1b products. The current IPF, Baseline C, was released in operation in April 2015 and the second CryoSat reprocessing campaign was jointly initiated, taking benefit of the upgrade implemented in the IPF1 processing chain but also of some specific configurations for the calibration corrections. In particular, the CryoSat Level1b BaselineC products generated in the framework of the second reprocessing campaign include refined information for what concerns the mispointing angles and the calibration corrections. This poster will thus detail thus the evolutions that are currently planned for the CryoSat BaselineD SAR/SARin Level1b products and the corresponding quality improvements that are expected.

  1. 32 CFR 202.13 - Technical assistance for public participation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Reporting Requirements § 202.13 Technical assistance for public participation. Community members of a RAB or TRC may request technical assistance for interpreting scientific and engineering issues with regard to...

  2. [Mathematical model of technical equipment of a clinical-diagnostic laboratory].

    PubMed

    Bukin, S I; Busygin, D V; Tilevich, M E

    1990-01-01

    The paper is concerned with the problems of technical equipment of standard clinico-diagnostic laboratories (CDL) in this country. The authors suggest a mathematic model that may minimize expenditures for laboratory studies. The model enables the following problems to be solved: to issue scientifically-based recommendations for technical equipment of CDL; to validate the medico-technical requirements for newly devised items; to select the optimum types of uniform items; to define optimal technical decisions at the stage of the design; to determine the lab assistant's labour productivity and the cost of some investigations; to compute the medical laboratory engineering requirement for treatment and prophylactic institutions of this country.

  3. 10 CFR 707.5 - Submission, approval, and implementation of a baseline workplace substance abuse program.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Submission, approval, and implementation of a baseline... PROGRAMS AT DOE SITES Procedures § 707.5 Submission, approval, and implementation of a baseline workplace... with the requirements of this part and the guidelines of the Department of Health and Human Services...

  4. 10 CFR 707.5 - Submission, approval, and implementation of a baseline workplace substance abuse program.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Submission, approval, and implementation of a baseline... PROGRAMS AT DOE SITES Procedures § 707.5 Submission, approval, and implementation of a baseline workplace... with the requirements of this part and the guidelines of the Department of Health and Human Services...

  5. 48 CFR 719.271-5 - Cognizant technical officers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... DEVELOPMENT SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Policies 719.271-5 Cognizant technical officers. Since the procurement process starts with the establishment of a requirement, the actions of the cognizant technical officers can affect the opportunity of small business to participate equitably...

  6. Engineering directorate technical facilities catalog

    NASA Technical Reports Server (NTRS)

    Maloy, Joseph E.

    1993-01-01

    The Engineering Directorate Technical Facilities Catalog is designed to provide an overview of the technical facilities available within the Engineering Directorate at the National Aeronautics and Space Administration (NASA), Lyndon B. Johnson Space Center (JSC) in Houston, Texas. The combined capabilities of these engineering facilities are essential elements of overall JSC capabilities required to manage and perform major NASA engineering programs. The facilities are grouped in the text by chapter according to the JSC division responsible for operation of the facility. This catalog updates the facility descriptions for the JSC Engineering Directorate Technical Facilities Catalog, JSC 19295 (August 1989), and supersedes the Engineering Directorate, Principle test and Development Facilities, JSC, 19962 (November 1984).

  7. 42 CFR 493.1838 - Training and technical assistance for unsuccessful participation in proficiency testing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false Training and technical assistance for unsuccessful... REQUIREMENTS Enforcement Procedures § 493.1838 Training and technical assistance for unsuccessful participation... may require the laboratory to undertake training of its personnel, or to obtain necessary technical...

  8. Change Analysis in Structural Laser Scanning Point Clouds: The Baseline Method

    PubMed Central

    Shen, Yueqian; Lindenbergh, Roderik; Wang, Jinhu

    2016-01-01

    A method is introduced for detecting changes from point clouds that avoids registration. For many applications, changes are detected between two scans of the same scene obtained at different times. Traditionally, these scans are aligned to a common coordinate system having the disadvantage that this registration step introduces additional errors. In addition, registration requires stable targets or features. To avoid these issues, we propose a change detection method based on so-called baselines. Baselines connect feature points within one scan. To analyze changes, baselines connecting corresponding points in two scans are compared. As feature points either targets or virtual points corresponding to some reconstructable feature in the scene are used. The new method is implemented on two scans sampling a masonry laboratory building before and after seismic testing, that resulted in damages in the order of several centimeters. The centres of the bricks of the laboratory building are automatically extracted to serve as virtual points. Baselines connecting virtual points and/or target points are extracted and compared with respect to a suitable structural coordinate system. Changes detected from the baseline analysis are compared to a traditional cloud to cloud change analysis demonstrating the potential of the new method for structural analysis. PMID:28029121

  9. Change Analysis in Structural Laser Scanning Point Clouds: The Baseline Method.

    PubMed

    Shen, Yueqian; Lindenbergh, Roderik; Wang, Jinhu

    2016-12-24

    A method is introduced for detecting changes from point clouds that avoids registration. For many applications, changes are detected between two scans of the same scene obtained at different times. Traditionally, these scans are aligned to a common coordinate system having the disadvantage that this registration step introduces additional errors. In addition, registration requires stable targets or features. To avoid these issues, we propose a change detection method based on so-called baselines. Baselines connect feature points within one scan. To analyze changes, baselines connecting corresponding points in two scans are compared. As feature points either targets or virtual points corresponding to some reconstructable feature in the scene are used. The new method is implemented on two scans sampling a masonry laboratory building before and after seismic testing, that resulted in damages in the order of several centimeters. The centres of the bricks of the laboratory building are automatically extracted to serve as virtual points. Baselines connecting virtual points and/or target points are extracted and compared with respect to a suitable structural coordinate system. Changes detected from the baseline analysis are compared to a traditional cloud to cloud change analysis demonstrating the potential of the new method for structural analysis.

  10. 30 CFR 7.304 - Technical requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (coarse, loose fitting) threads. The covers shall be secured against loosening. (5) Flat surfaces between... flame-arresting path shall be finished during the manufacturing process to not more than 250 microinches... requirements as the pole piece. (12) Coil-thread inserts, if used in holes for fastenings, shall meet the...

  11. 30 CFR 7.304 - Technical requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (coarse, loose fitting) threads. The covers shall be secured against loosening. (5) Flat surfaces between... flame-arresting path shall be finished during the manufacturing process to not more than 250 microinches... requirements as the pole piece. (12) Coil-thread inserts, if used in holes for fastenings, shall meet the...

  12. 30 CFR 7.304 - Technical requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (coarse, loose fitting) threads. The covers shall be secured against loosening. (5) Flat surfaces between... flame-arresting path shall be finished during the manufacturing process to not more than 250 microinches... requirements as the pole piece. (12) Coil-thread inserts, if used in holes for fastenings, shall meet the...

  13. 30 CFR 7.304 - Technical requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (coarse, loose fitting) threads. The covers shall be secured against loosening. (5) Flat surfaces between... flame-arresting path shall be finished during the manufacturing process to not more than 250 microinches... requirements as the pole piece. (12) Coil-thread inserts, if used in holes for fastenings, shall meet the...

  14. 30 CFR 7.304 - Technical requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (coarse, loose fitting) threads. The covers shall be secured against loosening. (5) Flat surfaces between... flame-arresting path shall be finished during the manufacturing process to not more than 250 microinches... requirements as the pole piece. (12) Coil-thread inserts, if used in holes for fastenings, shall meet the...

  15. 30 CFR 7.64 - Technical requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... produce the required firing current is attained. (d) Firing switch. The switch used to initiate the... current is available to the blasting circuit. (e) Firing line terminals. The terminals used to connect the blasting circuit to the blasting unit shall— (1) Provide a secure, low-resistance connection to the...

  16. 30 CFR 7.64 - Technical requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... produce the required firing current is attained. (d) Firing switch. The switch used to initiate the... current is available to the blasting circuit. (e) Firing line terminals. The terminals used to connect the blasting circuit to the blasting unit shall— (1) Provide a secure, low-resistance connection to the...

  17. Integrated Baseline System (IBS), Version 1. 03. [Chemical Stockpile Emergency Preparedness Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bailey, B.M.; Burford, M.J.; Downing, T.R.

    The Integrated Baseline System (IBS), operated by the Federal Emergency Management Agency (FEMA), is a system of computerized tools for emergency planing and analysis. This document is the user guide for the IBS and explains how to operate the IBS system. The fundamental function of the IBS is to provide tools that civilian emergency management personnel can use in developing emergency plans and in supporting emergency management activities to cope with a chemical-releasing event at a military chemical stockpile. Emergency management planners can evaluate concepts and ideas using the IBS system. The results of that experience can then be factoredmore » into refining requirements and plans. This document provides information for the general system user, and is the primary reference for the system features of the IBS. It is designed for persons who are familiar with general emergency management concepts, operations, and vocabulary. Although the IBS manual set covers basic and advanced operations, it is not a complete reference document set. Emergency situation modeling software in the IBS is supported by additional technical documents. Some of the other LBS software is commercial software for which more complete documentation is available. The IBS manuals reference such documentation where necessary. IBS is a dynamic system. Its capabilities are in a state of continuing expansion and enhancement.« less

  18. A New Statistics-Based Online Baseline Restorer for a High Count-Rate Fully Digital System.

    PubMed

    Li, Hongdi; Wang, Chao; Baghaei, Hossain; Zhang, Yuxuan; Ramirez, Rocio; Liu, Shitao; An, Shaohui; Wong, Wai-Hoi

    2010-04-01

    The goal of this work is to develop a novel, accurate, real-time digital baseline restorer using online statistical processing for a high count-rate digital system such as positron emission tomography (PET). In high count-rate nuclear instrumentation applications, analog signals are DC-coupled for better performance. However, the detectors, pre-amplifiers and other front-end electronics would cause a signal baseline drift in a DC-coupling system, which will degrade the performance of energy resolution and positioning accuracy. Event pileups normally exist in a high-count rate system and the baseline drift will create errors in the event pileup-correction. Hence, a baseline restorer (BLR) is required in a high count-rate system to remove the DC drift ahead of the pileup correction. Many methods have been reported for BLR from classic analog methods to digital filter solutions. However a single channel BLR with analog method can only work under 500 kcps count-rate, and normally an analog front-end application-specific integrated circuits (ASIC) is required for the application involved hundreds BLR such as a PET camera. We have developed a simple statistics-based online baseline restorer (SOBLR) for a high count-rate fully digital system. In this method, we acquire additional samples, excluding the real gamma pulses, from the existing free-running ADC in the digital system, and perform online statistical processing to generate a baseline value. This baseline value will be subtracted from the digitized waveform to retrieve its original pulse with zero-baseline drift. This method can self-track the baseline without a micro-controller involved. The circuit consists of two digital counter/timers, one comparator, one register and one subtraction unit. Simulation shows a single channel works at 30 Mcps count-rate with pileup condition. 336 baseline restorer circuits have been implemented into 12 field-programmable-gate-arrays (FPGA) for our new fully digital PET system.

  19. Baseline Estimation and Outlier Identification for Halocarbons

    NASA Astrophysics Data System (ADS)

    Wang, D.; Schuck, T.; Engel, A.; Gallman, F.

    2017-12-01

    The aim of this paper is to build a baseline model for halocarbons and to statistically identify the outliers under specific conditions. In this paper, time series of regional CFC-11 and Chloromethane measurements was discussed, which taken over the last 4 years at two locations, including a monitoring station at northwest of Frankfurt am Main (Germany) and Mace Head station (Ireland). In addition to analyzing time series of CFC-11 and Chloromethane, more importantly, a statistical approach of outlier identification is also introduced in this paper in order to make a better estimation of baseline. A second-order polynomial plus harmonics are fitted to CFC-11 and chloromethane mixing ratios data. Measurements with large distance to the fitting curve are regard as outliers and flagged. Under specific requirement, the routine is iteratively adopted without the flagged measurements until no additional outliers are found. Both model fitting and the proposed outlier identification method are realized with the help of a programming language, Python. During the period, CFC-11 shows a gradual downward trend. And there is a slightly upward trend in the mixing ratios of Chloromethane. The concentration of chloromethane also has a strong seasonal variation, mostly due to the seasonal cycle of OH. The usage of this statistical method has a considerable effect on the results. This method efficiently identifies a series of outliers according to the standard deviation requirements. After removing the outliers, the fitting curves and trend estimates are more reliable.

  20. EML Regional Baseline Station at Chester, NJ, 1987--1990

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-12-01

    The Environmental Measurements Laboratory (EML) has maintained a field station at Chester, NJ, since 1976. Located 64 kilometers west of EML, the site is on the property of Bell Communications Research and is a little more than 900 square meters in area. The Chester site is a rural facility which provides us with an opportunity to carry out regional baseline'' research and to test field instruments. In order to meet our special need the technical criteria for such a field station area the following. The site should represent a regional'' pollution condition; that is, no significant local pollution sources shouldmore » be present. The terrain should be relatively flat with minimal rock outcroppings. The soil cover should not have been disturbed for at least 30 years. This report updates the various programs underway at Chester and presents data that have become available since the last report.« less

  1. EML Regional Baseline Station at Chester, NJ, 1987--1990

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-12-01

    The Environmental Measurements Laboratory (EML) has maintained a field station at Chester, NJ, since 1976. Located 64 kilometers west of EML, the site is on the property of Bell Communications Research and is a little more than 900 square meters in area. The Chester site is a rural facility which provides us with an opportunity to carry out ``regional baseline`` research and to test field instruments. In order to meet our special need the technical criteria for such a field station area the following. The site should represent a ``regional`` pollution condition; that is, no significant local pollution sources shouldmore » be present. The terrain should be relatively flat with minimal rock outcroppings. The soil cover should not have been disturbed for at least 30 years. This report updates the various programs underway at Chester and presents data that have become available since the last report.« less

  2. Performance/Design Requirements and Detailed Technical Description for a Computer-Directed Training Subsystem for Integration into the Air Force Phase II Base Level System.

    ERIC Educational Resources Information Center

    Butler, A. K.; And Others

    The performance/design requirements and a detailed technical description for a Computer-Directed Training Subsystem to be integrated into the Air Force Phase II Base Level System are described. The subsystem may be used for computer-assisted lesson construction and has presentation capability for on-the-job training for data automation, staff, and…

  3. Integrated Baseline Review (IBR) Handbook

    NASA Technical Reports Server (NTRS)

    Fleming, Jon F.; Kehrer, Kristen C.

    2016-01-01

    The purpose of this handbook is intended to be a how-to guide to prepare for, conduct, and close-out an Integrated Baseline Review (IBR). It discusses the steps that should be considered, describes roles and responsibilities, tips for tailoring the IBR based on risk, cost, and need for management insight, and provides lessons learned from past IBRs. Appendices contain example documentation typically used in connection with an IBR. Note that these appendices are examples only, and should be tailored to meet the needs of individual projects and contracts. Following the guidance in this handbook will help customers and suppliers preparing for an IBR understand the expectations of the IBR, and ensure that the IBR meets the requirements for both in-house and contract efforts.

  4. Measurement of baseline and orientation between distributed aerospace platforms.

    PubMed

    Wang, Wen-Qin

    2013-01-01

    Distributed platforms play an important role in aerospace remote sensing, radar navigation, and wireless communication applications. However, besides the requirement of high accurate time and frequency synchronization for coherent signal processing, the baseline between the transmitting platform and receiving platform and the orientation of platform towards each other during data recording must be measured in real time. In this paper, we propose an improved pulsed duplex microwave ranging approach, which allows determining the spatial baseline and orientation between distributed aerospace platforms by the proposed high-precision time-interval estimation method. This approach is novel in the sense that it cancels the effect of oscillator frequency synchronization errors due to separate oscillators that are used in the platforms. Several performance specifications are also discussed. The effectiveness of the approach is verified by simulation results.

  5. TAPIR--Finnish national geochemical baseline database.

    PubMed

    Jarva, Jaana; Tarvainen, Timo; Reinikainen, Jussi; Eklund, Mikael

    2010-09-15

    In Finland, a Government Decree on the Assessment of Soil Contamination and Remediation Needs has generated a need for reliable and readily accessible data on geochemical baseline concentrations in Finnish soils. According to the Decree, baseline concentrations, referring both to the natural geological background concentrations and the diffuse anthropogenic input of substances, shall be taken into account in the soil contamination assessment process. This baseline information is provided in a national geochemical baseline database, TAPIR, that is publicly available via the Internet. Geochemical provinces with elevated baseline concentrations were delineated to provide regional geochemical baseline values. The nationwide geochemical datasets were used to divide Finland into geochemical provinces. Several metals (Co, Cr, Cu, Ni, V, and Zn) showed anomalous concentrations in seven regions that were defined as metal provinces. Arsenic did not follow a similar distribution to any other elements, and four arsenic provinces were separately determined. Nationwide geochemical datasets were not available for some other important elements such as Cd and Pb. Although these elements are included in the TAPIR system, their distribution does not necessarily follow the ones pre-defined for metal and arsenic provinces. Regional geochemical baseline values, presented as upper limit of geochemical variation within the region, can be used as trigger values to assess potential soil contamination. Baseline values have also been used to determine upper and lower guideline values that must be taken into account as a tool in basic risk assessment. If regional geochemical baseline values are available, the national guideline values prescribed in the Decree based on ecological risks can be modified accordingly. The national geochemical baseline database provides scientifically sound, easily accessible and generally accepted information on the baseline values, and it can be used in various

  6. Baseline adjustments for binary data in repeated cross-sectional cluster randomized trials.

    PubMed

    Nixon, R M; Thompson, S G

    2003-09-15

    Analysis of covariance models, which adjust for a baseline covariate, are often used to compare treatment groups in a controlled trial in which individuals are randomized. Such analysis adjusts for any baseline imbalance and usually increases the precision of the treatment effect estimate. We assess the value of such adjustments in the context of a cluster randomized trial with repeated cross-sectional design and a binary outcome. In such a design, a new sample of individuals is taken from the clusters at each measurement occasion, so that baseline adjustment has to be at the cluster level. Logistic regression models are used to analyse the data, with cluster level random effects to allow for different outcome probabilities in each cluster. We compare the estimated treatment effect and its precision in models that incorporate a covariate measuring the cluster level probabilities at baseline and those that do not. In two data sets, taken from a cluster randomized trial in the treatment of menorrhagia, the value of baseline adjustment is only evident when the number of subjects per cluster is large. We assess the generalizability of these findings by undertaking a simulation study, and find that increased precision of the treatment effect requires both large cluster sizes and substantial heterogeneity between clusters at baseline, but baseline imbalance arising by chance in a randomized study can always be effectively adjusted for. Copyright 2003 John Wiley & Sons, Ltd.

  7. A Perkins Challenge: Assessing Technical Skills in CTE

    ERIC Educational Resources Information Center

    Stone, James R., III

    2009-01-01

    Federal law requires state to develop performance measures and data-collection systems for secondary and postsecondary technical-skill attainment. This poses many challenges, such as defining a technical skills, measurement and when to assess students. In this article, the author outlines various assessment models and looks at the challenges…

  8. 30 CFR 777.13 - Reporting of technical data.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Reporting of technical data. 777.13 Section 777.13 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR... PROGRAMS GENERAL CONTENT REQUIREMENTS FOR PERMIT APPLICATIONS § 777.13 Reporting of technical data. (a) All...

  9. 47 CFR 74.861 - Technical requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... prescribed in paragraphs (c) through (e) of this section. (c) Low power auxiliary transmitters not required... bands—50 mW (ii) 470-608 and 614-698 MHz bands—250 mW (2) Transmitters may be either crystal controlled... eliminate the interference. (Sec. 5, 48 Stat. 1068; 47 U.S.C. 155) [43 FR 13576, Mar. 31, 1978, as amended...

  10. Baseline Study of Selected Professional Development Schools in West Virginia

    ERIC Educational Resources Information Center

    Gilchrist, Christina L.; Salgado, Dawn M.; Holloway, Joseph L.

    2005-01-01

    In August 2004, the WVDE asked the Appalachia Educational Laboratory at Edvantia, Inc. to evaluate the demonstration project, in order to meet the evaluation and reporting requirements set forth in the law. According to Fink (1993), baseline evaluation data allow for subsequent analyses of the effect or impact of a program. The purpose of this…

  11. Soft Skills: The New Curriculum for Hard-Core Technical Professionals

    ERIC Educational Resources Information Center

    Bancino, Randy; Zevalkink, Claire

    2007-01-01

    In this article, the authors talk about the importance of soft skills for hard-core technical professionals. In many technical professions, the complete focus of education and training is on technical topics either directly or indirectly related to a career or discipline. Students are generally required to master various mathematics skills,…

  12. Standard Avionics Packaging, Mounting, and Cooling Baseline Study.

    DTIC Science & Technology

    1980-01-31

    Lra ph spe c i F 1e s alIl s t a bi i - zat ion , cont rol , anlad di s pI a v i nf orinat i onl should4 bc ser ial1d tal . Are the sta’ ndards listed...uiremnts-Airborne Low Range Altimeter, DO-i 55 , which is the basis for the FAA Technical Standard Order (TSO), requires perform- ance in the range 0-50 fee

  13. Future Spacelift Requirements Study

    NASA Technical Reports Server (NTRS)

    1997-01-01

    This study addresses future space applications and the derived requirements these potential applications will have on future spacelift systems. This NASA sponsored activity is a comprehensive study of potential missions including those of the military, civil, and commercial users. The study objectively evaluated the key architectural requirements for future launch systems. The results of this study are technical, economic, and policy analyses of future spacelift systems. It is intended to assist NASA and DOD decision-makers in planning technical investments and establishing policy for future U.S. spacelift systems.

  14. Baseline geochemistry of soil and bedrock Tshirege Member of the Bandelier Tuff at MDA-P

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Warren, R.G.; McDonald, E.V.; Ryti, R.T.

    1997-08-01

    This report provides baseline geochemistry for soils (including fill), and for bedrock within three specific areas that are planned for use in the remediation of Material Disposal Area P (MDA-P) at Technical Area 16 (TA-16). The baseline chemistry includes leachable element concentrations for both soils and bedrock and total element concentrations for all soil samples and for two selected bedrock samples. MDA-P operated from the early 1950s to 1984 as a landfill for rubble and debris generated by the burning of high explosives (HE) at the TA-16 Burning Ground, HE-contaminated equipment and material, barium nitrate sand, building materials, and trash.more » The aim of this report is to establish causes for recognizable chemical differences between the background and baseline data sets. In many cases, the authors conclude that recognizable differences represent natural enrichments. In other cases, differences are best attributed to analytical problems. But most importantly, the comparison of background and baseline geochemistry demonstrates significant contamination for several elements not only at the two remedial sites near the TA-16 Burning Ground, but also within the entire region of the background study. This contamination is highly localized very near to the surface in soil and fill, and probably also in bedrock; consequently, upper tolerance limits (UTLs) calculated as upper 95% confidence limits of the 95th percentile are of little value and thus are not provided. This report instead provides basic statistical summaries and graphical comparisons for background and baseline samples to guide strategies for remediation of the three sites to be used in the restoration of MDA-P.« less

  15. FLAMMABLE GAS TECHNICAL BASIS DOCUMENT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    KRIPPS, L.J.

    2005-02-18

    This document describes the qualitative evaluation of frequency and consequences for double shell tank (DST) and single shell tank (SST) representative flammable gas accidents and associated hazardous conditions without controls. The evaluation indicated that safety-significant SSCs and/or TSRS were required to prevent or mitigate flammable gas accidents. Discussion on the resulting control decisions is included. This technical basis document was developed to support of the Tank Farms Documented Safety Analysis (DSA) and describes the risk binning process for the flammable gas representative accidents and associated represented hazardous conditions. The purpose of the risk binning process is to determine the needmore » for safety-significant structures, systems, and components (SSC) and technical safety requirement (TSR)-level controls for a given representative accident or represented hazardous condition based on an evaluation of the event frequency and consequence.« less

  16. Linear MALDI-ToF simultaneous spectrum deconvolution and baseline removal.

    PubMed

    Picaud, Vincent; Giovannelli, Jean-Francois; Truntzer, Caroline; Charrier, Jean-Philippe; Giremus, Audrey; Grangeat, Pierre; Mercier, Catherine

    2018-04-05

    Thanks to a reasonable cost and simple sample preparation procedure, linear MALDI-ToF spectrometry is a growing technology for clinical microbiology. With appropriate spectrum databases, this technology can be used for early identification of pathogens in body fluids. However, due to the low resolution of linear MALDI-ToF instruments, robust and accurate peak picking remains a challenging task. In this context we propose a new peak extraction algorithm from raw spectrum. With this method the spectrum baseline and spectrum peaks are processed jointly. The approach relies on an additive model constituted by a smooth baseline part plus a sparse peak list convolved with a known peak shape. The model is then fitted under a Gaussian noise model. The proposed method is well suited to process low resolution spectra with important baseline and unresolved peaks. We developed a new peak deconvolution procedure. The paper describes the method derivation and discusses some of its interpretations. The algorithm is then described in a pseudo-code form where the required optimization procedure is detailed. For synthetic data the method is compared to a more conventional approach. The new method reduces artifacts caused by the usual two-steps procedure, baseline removal then peak extraction. Finally some results on real linear MALDI-ToF spectra are provided. We introduced a new method for peak picking, where peak deconvolution and baseline computation are performed jointly. On simulated data we showed that this global approach performs better than a classical one where baseline and peaks are processed sequentially. A dedicated experiment has been conducted on real spectra. In this study a collection of spectra of spiked proteins were acquired and then analyzed. Better performances of the proposed method, in term of accuracy and reproductibility, have been observed and validated by an extended statistical analysis.

  17. PENNSYLVANIA BASELINE

    EPA Science Inventory

    This report was prepared as part of the Ohio River Basin Energy Study (ORBES), a multidisciplinary policy research program supported by the Environmental Protection Agency. Its purpose is to provide baseline information on Pennsylvania, one of the six states included partly or to...

  18. Long Baseline Neutrino Experiments

    NASA Astrophysics Data System (ADS)

    Mezzetto, Mauro

    2016-05-01

    Following the discovery of neutrino oscillations by the Super-Kamiokande collaboration, recently awarded with the Nobel Prize, two generations of long baseline experiments had been setup to further study neutrino oscillations. The first generation experiments, K2K in Japan, Minos in the States and Opera in Europe, focused in confirming the Super-Kamiokande result, improving the precision with which oscillation parameters had been measured and demonstrating the ντ appearance process. Second generation experiments, T2K in Japan and very recently NOνA in the States, went further, being optimized to look for genuine three neutrino phenomena like non-zero values of θ13 and first glimpses to leptonic CP violation (LCPV) and neutrino mass ordering (NMO). The discovery of leptonic CP violation will require third generation setups, at the moment two strong proposals are ongoing, Dune in the States and Hyper-Kamiokande in Japan. This review will focus a little more in these future initiatives.

  19. Developing dementia prevention trials: baseline report of the Home-Based Assessment study.

    PubMed

    Sano, Mary; Egelko, Susan; Donohue, Michael; Ferris, Steven; Kaye, Jeffrey; Hayes, Tamara L; Mundt, James C; Sun, Chung-Kai; Paparello, Silvia; Aisen, Paul S

    2013-01-01

    This report describes the baseline experience of the multicenter, Home-Based Assessment study, designed to develop methods for dementia prevention trials using novel technologies for test administration and data collection. Nondemented individuals of 75 years of age or more were recruited and evaluated in-person using established clinical trial outcomes of cognition and function, and randomized to one of 3 assessment methodologies: (1) mail-in questionnaire/live telephone interviews [mail-in/phone (MIP)]; (2) automated telephone with interactive voice recognition; and (3) internet-based computer Kiosk. Brief versions of cognitive and noncognitive outcomes were adapted to each methodology and administered at baseline and repeatedly over a 4-year period. "Efficiency" measures assessed the time from screening to baseline, and staff time required for each methodology. A total of 713 individuals signed consent and were screened; 640 met eligibility and were randomized to one of 3 assessment arms; and 581 completed baseline. Dropout, time from screening to baseline, and total staff time were highest among those assigned to internet-based computer Kiosk. However, efficiency measures were driven by nonrecurring start-up activities suggesting that differences may be mitigated over a long trial. Performance among Home-Based Assessment instruments collected through different technologies will be compared with established outcomes over this 4-year study.

  20. Developing Dementia Prevention Trials: Baseline Report of the Home-Based Assessment Study

    PubMed Central

    Sano, Mary; Egelko, Susan; Donohue, Michael; Ferris, Steven; Kaye, Jeffrey; Hayes, Tamara L.; Mundt, James C.; Sun, C.K.; Paparello, Silvia; Aisen, Paul S.

    2014-01-01

    This report describes the baseline experience of the multi-center, Home Based Assessment (HBA) study, designed to develop methods for dementia prevention trials using novel technologies for test administration and data collection. Non-demented individuals ≥ 75 years old were recruited and evaluated in-person using established clinical trial outcomes of cognition and function, and randomized to one of 3 assessment methodologies: 1) mail-in questionnaire/live telephone interviews (MIP); 2) automated telephone with interactive voice recognition (IVR); and 3) internet-based computer Kiosk (KIO). Brief versions of cognitive and non-cognitive outcomes, were adapted to each methodology and administered at baseline and repeatedly over a 4-year period. “Efficiency” measures assessed the time from screening to baseline, and staff time required for each methodology. 713 individuals signed consent and were screened; 640 met eligibility and were randomized to one of 3 assessment arms and 581 completed baseline. Drop out, time from screening to baseline and total staff time were highest among those assigned to KIO. However efficiency measures were driven by non-recurring start-up activities suggesting that differences may be mitigated over a long trial. Performance among HBA instruments collected via different technologies will be compared to established outcomes over this 4 year study. PMID:23151596

  1. Oscillation Baselining and Analysis Tool

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    PNNL developed a new tool for oscillation analysis and baselining. This tool has been developed under a new DOE Grid Modernization Laboratory Consortium (GMLC) Project (GM0072 - “Suite of open-source applications and models for advanced synchrophasor analysis”) and it is based on the open platform for PMU analysis. The Oscillation Baselining and Analysis Tool (OBAT) performs the oscillation analysis and identifies modes of oscillations (frequency, damping, energy, and shape). The tool also does oscillation event baselining (fining correlation between oscillations characteristics and system operating conditions).

  2. The International Linear Collider Technical Design Report - Volume 3.I: Accelerator \\& in the Technical Design Phase

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Adolphsen, Chris

    2013-06-26

    The International Linear Collider Technical Design Report (TDR) describes in four volumes the physics case and the design of a 500 GeV centre-of-mass energy linear electron-positron collider based on superconducting radio-frequency technology using Niobium cavities as the accelerating structures. The accelerator can be extended to 1 TeV and also run as a Higgs factory at around 250 GeV and on the Z0 pole. A comprehensive value estimate of the accelerator is give, together with associated uncertainties. It is shown that no significant technical issues remain to be solved. Once a site is selected and the necessary site-dependent engineering is carriedmore » out, construction can begin immediately. The TDR also gives baseline documentation for two high-performance detectors that can share the ILC luminosity by being moved into and out of the beam line in a "push-pull" configuration. These detectors, ILD and SiD, are described in detail. They form the basis for a world-class experimental programme that promises to increase significantly our understanding of the fundamental processes that govern the evolution of the Universe.« less

  3. Advancing Commercialization of Algal Biofuel through Increased Biomass Productivity and Technical Integration

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Anton, David

    The proposed project built on the foundation of over several years years of intensive and ground-breaking R&D work at Cellana's Kona Demonstration Facility (KDF). Phycological and engineering solutions were provided to tackle key cultivation issues and technical barriers limiting algal biomass productivity identified through work conducted outdoors at industrial (1 acre) scale. The objectives of this project were to significantly improve algal biomass productivity and reduce operational cost in a seawater-based system, using results obtained from two top-performing algal strains as the baseline while technically advancing and more importantly, integrating the various unit operations involved in algal biomass production, processing,more » and refining.« less

  4. Technical proficiency in hand-assisted laparoscopic colon and rectal surgery: determining how many cases are required to achieve mastery.

    PubMed

    Pendlimari, Rajesh; Holubar, Stefan D; Dozois, Eric J; Larson, David W; Pemberton, John H; Cima, Robert R

    2012-04-01

    To determine how many cases are required to achieve technical proficiency for hand-assisted laparoscopic surgery (HALS). Retrospective study. Tertiary care hospital. Using a prospective database, all HALS colorectal resections from 2003 to 2009 by 2 surgeons (A and B) were reviewed. Over 6 years, surgeons A and B performed 397 and 322 cases. Change-Point Analysis (CUSUM) was used to define the number of cases required to effect improvement in operative time. Cases before and after the change point were considered as being in the "learning period" and "skilled period." Operative time; short-term outcomes. The change point occurred after 108 and 105 cases for surgeons A and B, respectively. The learning period and skilled period were similar with respect to age, sex, body mass index, prior abdominal surgery, medical comorbidities, and American Society of Anesthesiologists class. Mean overall operative time decreased from 263 to 185 minutes (P < .001). The decrease in mean operative duration for specific resections were as follows: right colectomy, 35 minutes (P = .003); left colectomy, 63 minutes (P = .006); sigmoid colectomy, 63 minutes (P < .001); anterior resection, 70 minutes (P < .001); coloanal anastomosis, 52 minutes (P = .003); subtotal colectomy, 75 minutes (P < .001); and total proctocolectomy with ileal reservoir, 80 minutes (P < .001). Intraoperative complications and conversion rate were similar, but overall morbidity, infectious complications, readmissions, and length of stay were all significantly (P < .05) lower during the skilled period. For HALS colorectal resection, technical proficiency occurred after approximately 105 cases, and increased surgeon experience resulted in improved short-term outcomes. These data suggest that the learning curve for HALS colorectal resection will extend beyond fellowship training for many colorectal surgeons.

  5. Technical aspects and limitations of fractional flow reserve measurement.

    PubMed

    Jerabek, Stepan; Kovarnik, Tomas

    2018-02-27

    The only indication for coronary revascularization is elimination of ischaemia. Invasive hemodynamic methods (fractional flow reserve - FFR and instantaneous wave-free ratio (iFR) are superior to coronary angiography in detection of lesions causing myocardial ischaemia. Current European guidelines for myocardial revascularization recommend using of FFR for detection of functional assessment of lesions severity in category IA and number of these procedures increases. However, routine usage of these methods requires knowledge of technical requirements and limitations. The aim of the study is to summarise good clinical practice for FFR and iFR measurements with explanation of possible technical challenges, that are necessary for increasing of measurement accuracy. Authors describe frequent technical mistakes and malpractice during invasive assessment of lesion severity in coronary arteries.

  6. NATO Scientific and Technical Information Service (NSTIS): functional description. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Molholm, K.N.; Blados, W.N.; Bulca, C.

    1987-08-01

    This report provides a functional description of the requirements for a NATO Scientific and Technical Information Service (NSTIS). The user requirements and much of the background information in this report were derived primarily from interviews with more than 60 NATO Headquarters staff members between 2 March and 25 March 1987. In addition, representatives of the Supreme Headquarters Applied Powers Europe (SHAPE) Technical Centre (STC), the Supreme Allied Commander Atlantic (Anti-Submarine Warfare Research) Centre (SACLANTCEN), the NATO Communications and Information Systems Agency (NACISA), The Advisory Group for Aerospace Research and Development (AGARD), the U.S. Defense Technical Information Center (DTIC), and themore » Technical Documentation Center for the Armed Forces in the Netherlands (TDCK), were interviewed, either in person or by telephone.« less

  7. A Rotating Space Interferometer with Variable Baselines and Low Power Consumption

    NASA Technical Reports Server (NTRS)

    Gezari, Daniel Y.

    1999-01-01

    A new concept is presented here for a large, rotating space interferometer which would achieve full u, v plane coverage with reasonably uniform integration times, yet once set in motion no additional energy would be required to change collector separations, maintain constant baseline rotation rates, or to counteract centrifugal forces on the collectors.

  8. Discovering system requirements

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bahill, A.T.; Bentz, B.; Dean, F.F.

    1996-07-01

    Cost and schedule overruns are often caused by poor requirements that are produced by people who do not understand the requirements process. This report provides a high-level overview of the system requirements process, explaining types, sources, and characteristics of good requirements. System requirements, however, are seldom stated by the customer. Therefore, this report shows ways to help you work with your customer to discover the system requirements. It also explains terminology commonly used in the requirements development field, such as verification, validation, technical performance measures, and the various design reviews.

  9. 7 CFR 652.21 - Certification criteria and requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... must: (1) Have the required technical training, education, and experience to perform the level of technical assistance for which certification is sought; (2) Meet any applicable professional or business... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES TECHNICAL SERVICE PROVIDER ASSISTANCE...

  10. 48 CFR 252.227-7015 - Technical data-Commercial items.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... support contractor means a contractor under a contract, the primary purpose of which is to furnish...) Form, fit, and function data means technical data that describes the required overall physical... another party; (ii) Are form, fit, and function data; (iii) Are a correction or change to technical data...

  11. 48 CFR 252.227-7015 - Technical data-Commercial items.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... support contractor means a contractor under a contract, the primary purpose of which is to furnish...) Form, fit, and function data means technical data that describes the required overall physical... another party; (ii) Are form, fit, and function data; (iii) Are a correction or change to technical data...

  12. 48 CFR 252.227-7015 - Technical data-Commercial items.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... support contractor means a contractor under a contract, the primary purpose of which is to furnish...) Form, fit, and function data means technical data that describes the required overall physical... another party; (ii) Are form, fit, and function data; (iii) Are a correction or change to technical data...

  13. Development of a requirements management system for technical decision - making processes in the geological disposal project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hiroyoshi Ueda; Katsuhiko Ishiguro; Kazumi Kitayama

    2007-07-01

    NUMO (Nuclear Waste Management Organization of Japan) has a responsibility for implementing geological disposal of vitrified HLW (High-Level radioactive Waste) in the Japanese nuclear waste management programme. Its staged siting procedure was initiated in 2002 by an open call for volunteer sites. Careful management strategy and methodology for the technical decision-making at every milestone are required to prepare for the volunteer site application and the site investigation stages after that. The formal Requirement Management System (RMS) is planned to support the computerized implementation of the specific management methodology, termed the NUMO Structured Approach (NSA). This planned RMS will help formore » comprehensive management of the decision-making processes in the geological disposal project, change management towards the anticipated project deviations, efficient project driving such as well programmed R and D etc. and structured record-keeping regarding the past decisions, which leads to soundness of the project in terms of the long-term continuity. The system should have handling/management functions for the database including the decisions/requirements in the project in consideration, their associated information and the structures composed of them in every decision-making process. The information relating to the premises, boundary conditions and time plan of the project should also be prepared in the system. Effective user interface and efficient operation on the in-house network are necessary. As a living system for the long-term formal use, flexibility to updating is indispensable. In advance of the formal system development, two-year activity to develop the preliminary RMS was already started. The purpose of this preliminary system is to template the decision/requirement structure, prototype the decision making management and thus show the feasibility of the innovative RMS. The paper describes the current status of the development, focusing on

  14. Rationale of technical requirements for NRG-BR001: The first NCI-sponsored trial of SBRT for the treatment of multiple metastases.

    PubMed

    Al-Hallaq, Hania A; Chmura, Steven; Salama, Joseph K; Winter, Kathryn A; Robinson, Clifford G; Pisansky, Thomas M; Borges, Virginia; Lowenstein, Jessica R; McNulty, Susan; Galvin, James M; Followill, David S; Timmerman, Robert D; White, Julia R; Xiao, Ying; Matuszak, Martha M

    In 2014, the NRG Oncology Group initiated the first National Cancer Institute-sponsored, phase 1 clinical trial of stereotactic body radiation therapy (SBRT) for the treatment of multiple metastases in multiple organ sites (BR001; NCT02206334). The primary endpoint is to test the safety of SBRT for the treatment of 2 to 4 multiple lesions in several anatomic sites in a multi-institutional setting. Because of the technical challenges inherent to treating multiple lesions as their spatial separation decreases, we present the technical requirements for NRG-BR001 and the rationale for their selection. Patients with controlled primary tumors of breast, non-small cell lung, or prostate are eligible if they have 2 to 4 metastases distributed among 7 extracranial anatomic locations throughout the body. Prescription and organ-at-risk doses were determined by expert consensus. Credentialing requirements include (1) irradiation of the Imaging and Radiation Oncology Core phantom with SBRT, (2) submitting image guided radiation therapy case studies, and (3) planning the benchmark. Guidelines for navigating challenging planning cases including assessing composite dose are discussed. Dosimetric planning to multiple lesions receiving differing doses (45-50 Gy) and fractionation (3-5) while irradiating the same organs at risk is discussed, particularly for metastases in close proximity (≤5 cm). The benchmark case was selected to demonstrate the planning tradeoffs required to satisfy protocol requirements for 2 nearby lesions. Examples of passing benchmark plans exhibited a large variability in plan conformity. NRG-BR001 was developed using expert consensus on multiple issues from the dose fractionation regimen to the minimum image guided radiation therapy guidelines. Credentialing was tied to the task rather than the anatomic site to reduce its burden. Every effort was made to include a variety of delivery methods to reflect current SBRT technology. Although some simplifications

  15. An Evaluation of Selected NASA Scientific and Technical Information Products: Results of a Pilot Study.

    ERIC Educational Resources Information Center

    Pinelli, Thomas E.; Glassman, Myron

    A pilot study was conducted to evaluate selected NASA (National Aeronautics and Space Administration) scientific and technical information (STI) products. The study, which utilized survey research in the form of a self-administered mail questionnaire, had a two-fold purpose--to gather baseline data on the use and perceived usefulness of selected…

  16. Extended performance solar electric propulsion thrust system study. Volume 2: Baseline thrust system

    NASA Technical Reports Server (NTRS)

    Poeschel, R. L.; Hawthorne, E. I.

    1977-01-01

    Several thrust system design concepts were evaluated and compared using the specifications of the most advanced 30- cm engineering model thruster as the technology base. Emphasis was placed on relatively high-power missions (60 to 100 kW) such as a Halley's comet rendezvous. The extensions in thruster performance required for the Halley's comet mission were defined and alternative thrust system concepts were designed in sufficient detail for comparing mass, efficiency, reliability, structure, and thermal characteristics. Confirmation testing and analysis of thruster and power-processing components were performed, and the feasibility of satisfying extended performance requirements was verified. A baseline design was selected from the alternatives considered, and the design analysis and documentation were refined. The baseline thrust system design features modular construction, conventional power processing, and a concentractor solar array concept and is designed to interface with the space shuttle.

  17. Shuttle ku-band communications/radar technical concepts

    NASA Technical Reports Server (NTRS)

    Griffin, J. W.; Kelley, J. S.; Steiner, A. W.; Vang, H. A.; Zrubek, W. E.; Huth, G. K.

    1985-01-01

    Technical data on the Shuttle Orbiter K sub u-band communications/radar system are presented. The more challenging aspects of the system design and development are emphasized. The technical problems encountered and the advancements made in solving them are discussed. The radar functions are presented first. Requirements and design/implementation approaches are discussed. Advanced features are explained, including Doppler measurement, frequency diversity, multiple pulse repetition frequencies and pulse widths, and multiple modes. The communications functions that are presented include advances made because of the requirements for multiple communications modes. Spread spectrum, quadrature phase shift keying (QPSK), variable bit rates, and other advanced techniques are discussed. Performance results and conclusions reached are outlined.

  18. Emergency Response Capability Baseline Needs Assessment - Compliance Assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sharry, John A.

    This document was prepared by John A. Sharry, LLNL Fire Marshal and Division Leader for Fire Protection and was reviewed by LLNL Emergency Management Department Head, James Colson. This document is the second of a two-part analysis on Emergency Response Capabilities of Lawrence Livermore National Laboratory. The first part, 2016 Baseline Needs Assessment Requirements Document established the minimum performance criteria necessary to meet mandatory requirements. This second part analyses the performance of Lawrence Livermore Laboratory Emergency Management Department to the contents of the Requirements Document. The document was prepared based on an extensive review of information contained in the 2016more » BNA, a review of Emergency Planning Hazards Assessments, a review of building construction, occupancy, fire protection features, dispatch records, LLNL alarm system records, fire department training records, and fire department policies and procedures. The 2013 BNA was approved by NNSA’s Livermore Field Office on January 22, 2014.« less

  19. Establishing a store baseline during interim storage of waste packages and a review of potential technologies for base-lining

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McTeer, Jennifer; Morris, Jenny; Wickham, Stephen

    Interim storage is an essential component of the waste management lifecycle, providing a safe, secure environment for waste packages awaiting final disposal. In order to be able to monitor and detect change or degradation of the waste packages, storage building or equipment, it is necessary to know the original condition of these components (the 'waste storage system'). This paper presents an approach to establishing the baseline for a waste-storage system, and provides guidance on the selection and implementation of potential base-lining technologies. The approach is made up of two sections; assessment of base-lining needs and definition of base-lining approach. Duringmore » the assessment of base-lining needs a review of available monitoring data and store/package records should be undertaken (if the store is operational). Evolutionary processes (affecting safety functions), and their corresponding indicators, that can be measured to provide a baseline for the waste-storage system should then be identified in order for the most suitable indicators to be selected for base-lining. In defining the approach, identification of opportunities to collect data and constraints is undertaken before selecting the techniques for base-lining and developing a base-lining plan. Base-lining data may be used to establish that the state of the packages is consistent with the waste acceptance criteria for the storage facility and to support the interpretation of monitoring and inspection data collected during store operations. Opportunities and constraints are identified for different store and package types. Technologies that could potentially be used to measure baseline indicators are also reviewed. (authors)« less

  20. Baseline Design Compliance Matrix for the Rotary Mode Core Sampling System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LECHELT, J.A.

    2000-10-17

    The purpose of the design compliance matrix (DCM) is to provide a single-source document of all design requirements associated with the fifteen subsystems that make up the rotary mode core sampling (RMCS) system. It is intended to be the baseline requirement document for the RMCS system and to be used in governing all future design and design verification activities associated with it. This document is the DCM for the RMCS system used on Hanford single-shell radioactive waste storage tanks. This includes the Exhauster System, Rotary Mode Core Sample Trucks, Universal Sampling System, Diesel Generator System, Distribution Trailer, X-Ray Cart System,more » Breathing Air Compressor, Nitrogen Supply Trailer, Casks and Cask Truck, Service Trailer, Core Sampling Riser Equipment, Core Sampling Support Trucks, Foot Clamp, Ramps and Platforms and Purged Camera System. Excluded items are tools such as light plants and light stands. Other items such as the breather inlet filter are covered by a different design baseline. In this case, the inlet breather filter is covered by the Tank Farms Design Compliance Matrix.« less

  1. Employability and Technical Skill Required to Establish a Small Scale Automobile Workshop

    ERIC Educational Resources Information Center

    Olaitan, Olawale O.; Ikeh, Joshua O.

    2015-01-01

    The study focused on identifying the employability and technical skills needed to establish small-scale automobile workshop in Nsukka Urban of Enugu State. Five purposes of the study were stated to guide the study. Five research questions were stated and answered in line with the purpose of the study. The population for the study is 1,500…

  2. Evaluation of Cabin Crew Technical Knowledge

    NASA Technical Reports Server (NTRS)

    Dunbar, Melisa G.; Chute, Rebecca D.; Jordan, Kevin

    1998-01-01

    Accident and incident reports have indicated that flight attendants have numerous opportunities to provide the flight-deck crew with operational information that may prevent or essen the severity of a potential problem. Additionally, as carrier fleets transition from three person to two person flight-deck crews, the reliance upon the cabin crew for the transfer of this information may increase further. Recent research (Chute & Wiener, 1996) indicates that light attendants do not feel confident in their ability to describe mechanical parts or malfunctions of the aircraft, and the lack of flight attendant technical training has been referenced in a number of recent reports (National Transportation Safety Board, 1992; Transportation Safety Board of Canada, 1995; Chute & Wiener, 1996). The present study explored both flight attendant technical knowledge and flight attendant and dot expectations of flight attendant technical knowledge. To assess the technical knowledge if cabin crewmembers, 177 current flight attendants from two U.S. carriers voluntarily :ompleted a 13-item technical quiz. To investigate expectations of flight attendant technical knowledge, 181 pilots and a second sample of 96 flight attendants, from the same two airlines, completed surveys designed to capture each group's expectations of operational knowledge required of flight attendants. Analyses revealed several discrepancies between the present level of flight attendants.

  3. Mental practice enhances surgical technical skills: a randomized controlled study.

    PubMed

    Arora, Sonal; Aggarwal, Rajesh; Sirimanna, Pramudith; Moran, Aidan; Grantcharov, Teodor; Kneebone, Roger; Sevdalis, Nick; Darzi, Ara

    2011-02-01

    To assess the effects of mental practice on surgical performance. Increasing concerns for patient safety have highlighted a need for alternative training strategies outside the operating room. Mental practice (MP), "the cognitive rehearsal of a task before performance," has been successful in sport and music to enhance skill. This study investigates whether MP enhances performance in laparoscopic surgery. After baseline skills testing, 20 novice surgeons underwent training on an evidence-based virtual reality curriculum. After randomization using the closed envelope technique, all participants performed 5 Virtual Reality (VR) laparoscopic cholecystectomies (LC). Mental practice participants performed 30 minutes of MP before each LC; control participants viewed an online lecture. Technical performance was assessed using video Objective Structured Assessment of Technical Skills-based global ratings scale (scored from 7 to 35). Mental imagery was assessed using a previously validated Mental Imagery Questionnaire. Eighteen participants completed the study. There were no intergroup differences in baseline technical ability. Learning curves were demonstrated for both MP and control groups. Mental practice was superior to control (global ratings) for the first LC (median 20 vs 15, P = 0.005), second LC (20.5 vs 13.5, P = 0.001), third LC (24 vs 15.5, P < 0.001), fourth LC (25.5 vs 15.5, P < 0.001) and the fifth LC (27.5 vs 19.5, P = 0.00). The imagery for the MP group was also significantly superior to the control group across all sessions (P < 0.05). Improved imagery significantly correlated with better quality of performance (ρ 0.51–0.62, Ps < 0.05). This is the first randomized controlled study to show that MP enhances the quality of performance based on VR laparoscopic cholecystectomy. This may be a time- and cost-effective strategy to augment traditional training in the OR thus potentially improving patient care.

  4. Design and Requirements Creep In A Build-To-Print Mission

    NASA Technical Reports Server (NTRS)

    Peabody, Sharon A.; Otero, Veronica

    2017-01-01

    Build-to-Print designs, or rebuilds of flight proven designs, are attractive to mission stakeholders, as they give the appearance of minimal engineering development cost, risk, and schedule. The reality is that seldom is a project an exact duplicate of a predecessor. Mission reclassification, improvements in hardware, and science objective changes can all serve as a source of requirements and design creep and have ramifications often not fully anticipated during initial proposals. The Thermal Infrared Sensor Instrument (TIRS) was a late addition to the LandSat-8 program to provide infrared imaging to measure evapotranspiration for water cycle management. To meet the launch requirements for LandSat-8, instrument design life requirements were relaxed, the sensor development expedited, and technology development was minimized. Consequently, TIRS was designed as a higher risk instrument, with less redundancy than an instrument critical to mission success. After the successful LandSat-8 launch in 2013 and instrument performance, a rebuild of the instrument for the next LandSat spacecraft was included in the baseline mission success criteria. This paper discusses the technical challenges encountered during the rebuild of the TIRS-2 (Thermal Infrared Sensor 2) instrument and the resultant impacts on the thermal system design.

  5. 47 CFR 24.415 - Technical content of applications; maintenance of list of station locations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... of list of station locations. 24.415 Section 24.415 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... number of general technical requirements. (b) Each application (except applications for initial licenses...

  6. 47 CFR 24.415 - Technical content of applications; maintenance of list of station locations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... of list of station locations. 24.415 Section 24.415 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... number of general technical requirements. (b) Each application (except applications for initial licenses...

  7. 47 CFR 24.415 - Technical content of applications; maintenance of list of station locations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... of list of station locations. 24.415 Section 24.415 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... number of general technical requirements. (b) Each application (except applications for initial licenses...

  8. 47 CFR 24.415 - Technical content of applications; maintenance of list of station locations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... of list of station locations. 24.415 Section 24.415 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... number of general technical requirements. (b) Each application (except applications for initial licenses...

  9. 47 CFR 24.415 - Technical content of applications; maintenance of list of station locations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... of list of station locations. 24.415 Section 24.415 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... number of general technical requirements. (b) Each application (except applications for initial licenses...

  10. Vocational-Technical Education Today.

    ERIC Educational Resources Information Center

    American Vocational Association, Alexandria, VA.

    Vocational-technical education (VTE) today encompasses a diverse array of programs to equip students with work and life skills. A widening skills gap in the nation's work force, coupled with the fact that only about 20% of the nation's current jobs require a four-year college degree, has made VTE more important than ever before. Research has…

  11. Beyond Metrics? The Role of Hydrologic Baseline Archetypes in Environmental Water Management.

    PubMed

    Lane, Belize A; Sandoval-Solis, Samuel; Stein, Eric D; Yarnell, Sarah M; Pasternack, Gregory B; Dahlke, Helen E

    2018-06-22

    Balancing ecological and human water needs often requires characterizing key aspects of the natural flow regime and then predicting ecological response to flow alterations. Flow metrics are generally relied upon to characterize long-term average statistical properties of the natural flow regime (hydrologic baseline conditions). However, some key aspects of hydrologic baseline conditions may be better understood through more complete consideration of continuous patterns of daily, seasonal, and inter-annual variability than through summary metrics. Here we propose the additional use of high-resolution dimensionless archetypes of regional stream classes to improve understanding of baseline hydrologic conditions and inform regional environmental flows assessments. In an application to California, we describe the development and analysis of hydrologic baseline archetypes to characterize patterns of flow variability within and between stream classes. We then assess the utility of archetypes to provide context for common flow metrics and improve understanding of linkages between aquatic patterns and processes and their hydrologic controls. Results indicate that these archetypes may offer a distinct and complementary tool for researching mechanistic flow-ecology relationships, assessing regional patterns for streamflow management, or understanding impacts of changing climate.

  12. Percutaneous Cryoablation of Clinical T2 (> 7 cm) Renal Masses: Technical Considerations, Complications, and Short-Term Outcomes.

    PubMed

    Moynagh, Michael R; Schmit, Grant D; Thompson, Robert H; Boorjian, Stephen A; Woodrum, David A; Curry, Timothy B; Atwell, Thomas D

    2015-06-01

    To determine the technical success, safety, and preliminary clinical outcome of percutaneous cryoablation of large (> 7 cm) renal masses. Twelve patients underwent percutaneous cryoablation for treatment of renal tumors measuring greater than 7 cm (clinical stage II, T2aN0M0) between 2004 and 2013. Median patient age was 75 years (range, 46-84 y), median Charlson comorbidity index was 5 (range, 4-9), and median maximal tumor diameter was 8.4 cm (range, 7.2-9.7 cm). Seven of the 12 patients underwent superselective intraarterial tumor embolization before cryoablation. Technical success, procedural complications, renal function, and oncologic and survival outcomes were evaluated for each patient. All cryoablation procedures were technically successful in a single treatment session, with no mortalities at 30 days. Two patients (17%) experienced major complications related to postprocedural hemorrhage. Median change in estimated glomerular filtration rate within 7 days following cryoablation treatment was 11 mL/min (range, 7-14 mL/min). One patient with baseline stage IV chronic kidney disease and a major bleeding complication required temporary dialysis in the periprocedural period. In 11 patients (92%) who had follow-up beyond 3 months after the procedure (mean, 19 mo; range, 4-49 mo), recurrence-free survival and overall survival rates at 2 years were 100% and 91%, respectively. Percutaneous cryoablation of large (> 7 cm) renal masses was technically successful, with effective preliminary clinical outcomes. However, major complications are more common with cryoablation of stage T2 tumors than is typically encountered with treatment of smaller stage T1 tumors. Copyright © 2015 SIR. Published by Elsevier Inc. All rights reserved.

  13. Enhancing organizational capacity to provide cancer control programs among Latino churches: design and baseline findings of the CRUZA Study.

    PubMed

    Allen, Jennifer D; Torres, Maria Idali; Tom, Laura S; Rustan, Sarah; Leyva, Bryan; Negron, Rosalyn; Linnan, Laura A; Jandorf, Lina; Ospino, Hosffman

    2015-04-09

    Faith-based organizations (FBOs) have been successful in delivering health promotion programs for African Americans, though few studies have been conducted among Latinos. Even fewer have focused on organizational change, which is required to sustain community-based initiatives. We hypothesized that FBOs serving Latinos would be more likely to offer evidence-based strategies (EBS) for cancer control after receiving a capacity enhancement intervention to implement health programs, and designed the CRUZA trial to test this hypothesis. This paper describes the CRUZA design and baseline findings. We identified Catholic parishes in Massachusetts that provided Spanish-language mass (n = 65). A baseline survey assessed organizational characteristics relevant to adoption of health programs, including readiness for adoption, "fit" between innovation and organizational mission, implementation climate, and organizational culture. In the next study phase, parishes that completed the baseline assessment will be recruited to a randomized cluster trial, with the parish as the unit of analysis. Both groups will receive a Program Manual and Toolkit. Capacity Enhancement parishes will also be offered technical support, assistance forming health committees and building inter-institutional partnerships, and skills-based training. Of the 49 parishes surveyed at baseline (75%), one-third (33%) reported having provided at least one health program in the prior year. However, only two program offerings were cancer-specific. Nearly one-fifth (18%) had an active health ministry. There was a high level of organizational readiness to adopt cancer control programs, high congruence between parish missions and CRUZA objectives, moderately conducive implementation climates, and organizational cultures supportive of CRUZA programming. Having an existing health ministry was significantly associated with having offered health programs within the past year. Relationships between health program

  14. Configuration management program plan for Hanford site systems engineering

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kellie, C.L.

    This plan establishes the integrated management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford Site Technical Baseline.

  15. Configuration management program plan for Hanford site systems engineering

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoffman, A.G.

    This plan establishes the integrated configuration management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford site technical baseline.

  16. TWRS Configuration management program plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vann, J.M.

    The TWRS Configuration Management Program Plan (CMPP) integrates technical and administrative controls to establish and maintain consistency among requirements, product configuration, and product information for TWRS products during all life cycle phases. This CMPP will be used by TWRS management and configuration management personnel to establish and manage the technical and integrated baselines and controls and status changes to those baselines.

  17. Earth Observatory Satellite system definition study. Report 5: System design and specifications. Volume 1: Baseline system description

    NASA Technical Reports Server (NTRS)

    1974-01-01

    A system baseline design oriented to the requirements of the next generation of Earth Observatory Satellite missions is presented. The first mission (EOS-A) is envisioned as a two-fold mission which (1) provides a continuum of data of the type being supplied by ERTS for the emerging operational applications and also (2) expands the research and development activities for future instrumentation and analysis techniques. The baseline system specifically satisfies the requirements of this first mission. However, EOS-A is expected to be the first of a series of earth observation missions. Thus the baseline design has been developed so as to accommodate these latter missions effectively as the transition is made from conventional, expendable launch vehicles and spacecraft to the Shuttle Space Transportation System era. Further, a subset of alternative missions requirements including Seasat, SEOS, SMM and MSS-5 have been analyzed to verify that the spacecraft design to serve a multi-mission role is economically sound. A key feature of the baseline system design is the concept of a modular observatory system whose elements are compatible with varying levels of launch vehicle capability. The design configuration can be used with either the Delta or Titan launch vehicles and will adapt readily to the space shuttle when that system becomes available in the early 1980's.

  18. Defining Requirements and Related Methods for Designing Sensorized Garments.

    PubMed

    Andreoni, Giuseppe; Standoli, Carlo Emilio; Perego, Paolo

    2016-05-26

    Designing smart garments has strong interdisciplinary implications, specifically related to user and technical requirements, but also because of the very different applications they have: medicine, sport and fitness, lifestyle monitoring, workplace and job conditions analysis, etc. This paper aims to discuss some user, textile, and technical issues to be faced in sensorized clothes development. In relation to the user, the main requirements are anthropometric, gender-related, and aesthetical. In terms of these requirements, the user's age, the target application, and fashion trends cannot be ignored, because they determine the compliance with the wearable system. Regarding textile requirements, functional factors-also influencing user comfort-are elasticity and washability, while more technical properties are the stability of the chemical agents' effects for preserving the sensors' efficacy and reliability, and assuring the proper duration of the product for the complete life cycle. From the technical side, the physiological issues are the most important: skin conductance, tolerance, irritation, and the effect of sweat and perspiration are key factors for reliable sensing. Other technical features such as battery size and duration, and the form factor of the sensor collector, should be considered, as they affect aesthetical requirements, which have proven to be crucial, as well as comfort and wearability.

  19. Defining Requirements and Related Methods for Designing Sensorized Garments

    PubMed Central

    Andreoni, Giuseppe; Standoli, Carlo Emilio; Perego, Paolo

    2016-01-01

    Designing smart garments has strong interdisciplinary implications, specifically related to user and technical requirements, but also because of the very different applications they have: medicine, sport and fitness, lifestyle monitoring, workplace and job conditions analysis, etc. This paper aims to discuss some user, textile, and technical issues to be faced in sensorized clothes development. In relation to the user, the main requirements are anthropometric, gender-related, and aesthetical. In terms of these requirements, the user’s age, the target application, and fashion trends cannot be ignored, because they determine the compliance with the wearable system. Regarding textile requirements, functional factors—also influencing user comfort—are elasticity and washability, while more technical properties are the stability of the chemical agents’ effects for preserving the sensors’ efficacy and reliability, and assuring the proper duration of the product for the complete life cycle. From the technical side, the physiological issues are the most important: skin conductance, tolerance, irritation, and the effect of sweat and perspiration are key factors for reliable sensing. Other technical features such as battery size and duration, and the form factor of the sensor collector, should be considered, as they affect aesthetical requirements, which have proven to be crucial, as well as comfort and wearability. PMID:27240361

  20. A funding model for health visiting: baseline requirements--part 1.

    PubMed

    Cowley, Sarah

    2007-11-01

    A funding model proposed in two papers will outline the health visiting resource, including team skill mix, required to deliver the recommended approach of 'progressive universalism,' taking account of health inequalities, best evidence and impact on outcomes that might be anticipated. The model has been discussed as far as possible across the professional networks of both the Community Practitioners' and Health Visitors' Association (CPHVA) and United Kingdom Public Health Association (UKPHA), and is a consensus statement agreed by all who have participated.

  1. Spacecraft attitude calibration/verification baseline study

    NASA Technical Reports Server (NTRS)

    Chen, L. C.

    1981-01-01

    A baseline study for a generalized spacecraft attitude calibration/verification system is presented. It can be used to define software specifications for three major functions required by a mission: the pre-launch parameter observability and data collection strategy study; the in-flight sensor calibration; and the post-calibration attitude accuracy verification. Analytical considerations are given for both single-axis and three-axis spacecrafts. The three-axis attitudes considered include the inertial-pointing attitudes, the reference-pointing attitudes, and attitudes undergoing specific maneuvers. The attitude sensors and hardware considered include the Earth horizon sensors, the plane-field Sun sensors, the coarse and fine two-axis digital Sun sensors, the three-axis magnetometers, the fixed-head star trackers, and the inertial reference gyros.

  2. Vocational-Technical Marine Career Opportunities in Texas.

    ERIC Educational Resources Information Center

    Hollin, Dewayne

    Presented are background information and descriptions of jobs in various Texas marine industries, as well as a summary of the training required for particular positions. Since the emphasis is upon vocational-technical training for immediate job placement, most opportunities discussed require a high school diploma and some on-the-job education.…

  3. Functions and requirements for tank farm restoration and safe operations, Project W-314. Revision 3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Garrison, R.C.

    1995-02-01

    This Functions and Requirements document (FRD) establishes the basic performance criteria for Project W-314, in accordance with the guidance outlined in the letter from R.W. Brown, RL, to President, WHC, ``Tank Waste Remediation System (TWRS) Project Documentation Methodology,`` 94-PRJ-018, dated 3/18/94. The FRD replaces the Functional Design Criteria (FDC) as the project technical baseline documentation. Project W-314 will improve the reliability of safety related systems, minimize onsite health and safety hazards, and support waste retrieval and disposal activities by restoring and/or upgrading existing Tank Farm facilities and systems. The scope of Project W-314 encompasses the necessary restoration upgrades of themore » Tank Farms` instrumentation, ventilation, electrical distribution, and waste transfer systems.« less

  4. 47 CFR 24.815 - Technical content of applications; maintenance of list of station locations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... of list of station locations. 24.815 Section 24.815 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... describe a number of general technical requirements. (b) Each application (except applications for initial...

  5. 47 CFR 24.815 - Technical content of applications; maintenance of list of station locations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... of list of station locations. 24.815 Section 24.815 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... describe a number of general technical requirements. (b) Each application (except applications for initial...

  6. 47 CFR 24.815 - Technical content of applications; maintenance of list of station locations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... of list of station locations. 24.815 Section 24.815 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... describe a number of general technical requirements. (b) Each application (except applications for initial...

  7. 47 CFR 24.815 - Technical content of applications; maintenance of list of station locations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... of list of station locations. 24.815 Section 24.815 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... describe a number of general technical requirements. (b) Each application (except applications for initial...

  8. Integrated Baseline System (IBS), Version 1.03. User guide: Chemical Stockpile Emergency Preparedness Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bailey, B.M.; Burford, M.J.; Downing, T.R.

    The Integrated Baseline System (IBS), operated by the Federal Emergency Management Agency (FEMA), is a system of computerized tools for emergency planing and analysis. This document is the user guide for the IBS and explains how to operate the IBS system. The fundamental function of the IBS is to provide tools that civilian emergency management personnel can use in developing emergency plans and in supporting emergency management activities to cope with a chemical-releasing event at a military chemical stockpile. Emergency management planners can evaluate concepts and ideas using the IBS system. The results of that experience can then be factoredmore » into refining requirements and plans. This document provides information for the general system user, and is the primary reference for the system features of the IBS. It is designed for persons who are familiar with general emergency management concepts, operations, and vocabulary. Although the IBS manual set covers basic and advanced operations, it is not a complete reference document set. Emergency situation modeling software in the IBS is supported by additional technical documents. Some of the other LBS software is commercial software for which more complete documentation is available. The IBS manuals reference such documentation where necessary. IBS is a dynamic system. Its capabilities are in a state of continuing expansion and enhancement.« less

  9. 78 FR 42821 - Agency Information Collection (Technical Industry Standards) Activities Under OMB Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-17

    ... (Technical Industry Standards) Activities Under OMB Review AGENCY: Office of Acquisition and Logistics... Affairs Acquisition Regulation (VAAR) Provision 852.211-72 (formerly 852.211-75), Technical Industry.... Abstract: VAAR provision 852.211-72, Technical Industry Standards, requires items offered for sale to VA...

  10. Supersonics Project: Airport Noise Technical Challenge

    NASA Technical Reports Server (NTRS)

    Bridges, James E.

    2008-01-01

    This presentation gives an overview of the work being done under the Airport Noise Technical Challenge portion of the Supersonics Project in the Fundamental Aeronautics Program. The objective of the Challenge is to provide technology (e.g. low noise nozzle concepts) and engineering tools required for a viable supersonic aircraft. To accomplish this we have activities divided into Prediction, Diagnostics, and Engineering elements. Each of the tasks reviewed here have potential applications to work being done at other flight regimes and other aircraft and are of interest to the Acoustics Technical Working Group.

  11. 13 CFR 306.3 - Application requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Application requirements. 306.3 Section 306.3 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE TRAINING, RESEARCH AND TECHNICAL ASSISTANCE INVESTMENTS Local and National Technical Assistance § 306.3...

  12. 13 CFR 306.3 - Application requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 13 Business Credit and Assistance 1 2012-01-01 2012-01-01 false Application requirements. 306.3 Section 306.3 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE TRAINING, RESEARCH AND TECHNICAL ASSISTANCE INVESTMENTS Local and National Technical Assistance § 306.3...

  13. 13 CFR 306.3 - Application requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 13 Business Credit and Assistance 1 2014-01-01 2014-01-01 false Application requirements. 306.3 Section 306.3 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE TRAINING, RESEARCH AND TECHNICAL ASSISTANCE INVESTMENTS Local and National Technical Assistance § 306.3...

  14. 13 CFR 306.3 - Application requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 13 Business Credit and Assistance 1 2011-01-01 2011-01-01 false Application requirements. 306.3 Section 306.3 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE TRAINING, RESEARCH AND TECHNICAL ASSISTANCE INVESTMENTS Local and National Technical Assistance § 306.3...

  15. 13 CFR 306.3 - Application requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 13 Business Credit and Assistance 1 2013-01-01 2013-01-01 false Application requirements. 306.3 Section 306.3 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE TRAINING, RESEARCH AND TECHNICAL ASSISTANCE INVESTMENTS Local and National Technical Assistance § 306.3...

  16. Career and Technical Education in the Crossroads of Change

    ERIC Educational Resources Information Center

    Quailey, Janice

    2012-01-01

    Career and technical education (CTE) is faced with numerous forces that may impact its future. A variety of forces directly or indirectly affect CTE, ranging from the persisting stigma or negative image of career and technical education, the schools' curricular structure and requirements, along with federal laws such as No Child Left Behind (NCLB)…

  17. Optimal Corrosion Control Treatment Evaluation Technical Recommendations

    EPA Pesticide Factsheets

    This document provides technical recommendations that both systems and primacy agencies can use to comply with LCR CCT requirements and effective evaluation and designation of optimal corrosion control treatment (OCCT).

  18. FAQs about Baseline Testing among Young Athletes

    MedlinePlus

    ... your league prepare for concussions both pre- and post-season. What is baseline testing? Baseline testing is a pre-season exam conducted by a trained health care professional. Baseline tests are used to assess an athlete’s balance and ...

  19. Environmental baseline conditions for impact assessment of unconventional gas exploitation: the G-Baseline project

    NASA Astrophysics Data System (ADS)

    Kloppmann, Wolfram; Mayer, Berhard; Millot, Romain; Parker, Beth L.; Gaucher, Eric; Clarkson, Christopher R.; Cherry, John A.; Humez, Pauline; Cahill, Aaron

    2015-04-01

    A major scientific challenge and an indispensible prerequisite for environmental impact assessment in the context of unconventional gas development is the determination of the baseline conditions against which potential environmental impacts on shallow freshwater resources can be accurately and quantitatively tested. Groundwater and surface water resources overlying the low-permeability hydrocarbon host rocks containing shale gas may be impacted to different extents by naturally occurring saline fluids and by natural gas emanations. Baseline assessments in areas of previous conventional hydrocarbon production may also reveal anthropogenic impacts from these activities not related to unconventional gas development. Once unconventional gas exploitation has started, the baseline may be irrevocably lost by the intricate superposition of geogenic and potential anthropogenic contamination by stray gas, formation waters and chemicals used during hydraulic fracturing. The objective of the Franco-Canadian NSERC-ANR project G-Baseline is to develop an innovative and comprehensive methodology of geochemical and isotopic characterization of the environmental baseline for water and gas samples from all three essential zones: (1) the production zone, including flowback waters, (2) the intermediate zone comprised of overlying formations, and (3) shallow aquifers and surface water systems where contamination may result from diverse natural or human impacts. The outcome will be the establishment of a methodology based on innovative tracer and monitoring techniques, including traditional and non-traditional isotopes (C, H, O, S, B, Sr, Cl, Br, N, U, Li, Cu, Zn, CSIA...) for detecting, quantifying and modeling of potential leakage of stray gas and of saline formation water mixed with flowback fluids into fresh groundwater resources and surface waters taking into account the pathways and mechanisms of fluid and gas migration. Here we present an outline of the project as well as first

  20. Minimally Invasive Implantable Fetal Micropacemaker: Mechanical Testing and Technical Refinements

    PubMed Central

    Zhou, Li; Vest, Adriana N.; Peck, Raymond A.; Sredl, Jonathan P.; Huang, Xuechen; Bar-Cohen, Yaniv; Silka, Michael J.; Pruetz, Jay D.; Chmait, Ramen H.; Loeb, Gerald E.

    2016-01-01

    This paper discusses the technical and safety requirements for cardiac pacing of a human fetus with heart failure and hydrops fetalis secondary to complete heart block. Engineering strategies to meet specific technical requirements were integrated into a systematic design and implementation consisting of a novel fetal micropacemaker, a percutaneous implantation system, and a sterile package that enables device storage and recharging maintenance in a clinical setting. We further analyzed observed problems on myocardial fixation and pacing lead fatigue previously reported in earlier preclinical trials. This paper describes the technical refinements of the implantable fetal micropacemaker to overcome these challenges. The mechanical performance has been extensively tested to verify the improvement of reliability and safety margins of the implantation system. PMID:27021067

  1. The Technical Work Plan Tracking Tool

    NASA Technical Reports Server (NTRS)

    Chullen, Cinda; Leighton, Adele; Weller, Richard A.; Woodfill, Jared; Parkman, William E.; Ellis, Glenn L.; Wilson, Marilyn M.

    2003-01-01

    The Technical Work Plan Tracking Tool is a web-based application that enables interactive communication and approval of contract requirements that pertain to the administration of the Science, Engineering, Analysis, and Test (SEAT) contract at Johnson Space Center. The implementation of the application has (1) shortened the Technical Work Plan approval process, (2) facilitated writing and documenting requirements in a performance-based environment with associated surveillance plans, (3) simplified the contractor s estimate of the cost for the required work, and (4) allowed for the contractor to document how they plan to accomplish the work. The application is accessible to over 300 designated NASA and contractor employees via two Web sites. For each employee, the application regulates access according to the employee s authority to enter, view, and/or print out diverse information, including reports, work plans, purchase orders, and financial data. Advanced features of this application include on-line approval capability, automatic e-mail notifications requesting review by subsequent approvers, and security inside and outside the firewall.

  2. Technical Leadership Development Program

    DTIC Science & Technology

    2010-12-13

    the traditional tenets of leadership and management , systems thinking, understanding SOS issues, and thinking and acting holistically. Our research...international element 2.0 Enterprise Leadership and Management UNCLASSIFIED Contract Number: H98230-08-D-0171 DO 002. TO002, RT 004 Report No...mechanisms for leadership of the overall technical effort, for systems engineering, for requirements, management , and for systems integration. o Develop

  3. Research of flaw image collecting and processing technology based on multi-baseline stereo imaging

    NASA Astrophysics Data System (ADS)

    Yao, Yong; Zhao, Jiguang; Pang, Xiaoyan

    2008-03-01

    Aiming at the practical situations such as accurate optimal design, complex algorithms and precise technical demands of gun bore flaw image collecting, the design frame of a 3-D image collecting and processing system based on multi-baseline stereo imaging was presented in this paper. This system mainly including computer, electrical control box, stepping motor and CCD camera and it can realize function of image collection, stereo matching, 3-D information reconstruction and after-treatments etc. Proved by theoretical analysis and experiment results, images collected by this system were precise and it can slake efficiently the uncertainty problem produced by universally veins or repeated veins. In the same time, this system has faster measure speed and upper measure precision.

  4. 48 CFR 1334.202 - Integrated baseline reviews.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION Earned Value Management System 1334.202 Integrated baseline reviews. An Integrated Baseline Review shall be conducted when an Earned Value Management System... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Integrated baseline...

  5. 48 CFR 1334.202 - Integrated baseline reviews.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION Earned Value Management System 1334.202 Integrated baseline reviews. An Integrated Baseline Review shall be conducted when an Earned Value Management System... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Integrated baseline...

  6. 48 CFR 1334.202 - Integrated baseline reviews.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION Earned Value Management System 1334.202 Integrated baseline reviews. An Integrated Baseline Review shall be conducted when an Earned Value Management System... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Integrated baseline...

  7. 48 CFR 1334.202 - Integrated baseline reviews.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION Earned Value Management System 1334.202 Integrated baseline reviews. An Integrated Baseline Review shall be conducted when an Earned Value Management System... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Integrated baseline...

  8. 48 CFR 1334.202 - Integrated baseline reviews.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION Earned Value Management System 1334.202 Integrated baseline reviews. An Integrated Baseline Review shall be conducted when an Earned Value Management System... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Integrated baseline...

  9. 22 CFR 125.6 - Certification requirements for exemptions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... LICENSES FOR THE EXPORT OF TECHNICAL DATA AND CLASSIFIED DEFENSE ARTICLES § 125.6 Certification requirements for exemptions. (a) To claim an exemption for the export of technical data under the provisions of.... Certifications consist of clearly marking the package or letter containing the technical data “22 CFR [insert...

  10. 22 CFR 125.6 - Certification requirements for exemptions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    .... Certifications consist of clearly marking the package or letter containing the technical data “22 CFR [insert... LICENSES FOR THE EXPORT OF TECHNICAL DATA AND CLASSIFIED DEFENSE ARTICLES § 125.6 Certification requirements for exemptions. (a) To claim an exemption for the export of technical data under the provisions of...

  11. 22 CFR 125.6 - Certification requirements for exemptions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    .... Certifications consist of clearly marking the package or letter containing the technical data “22 CFR [insert... LICENSES FOR THE EXPORT OF TECHNICAL DATA AND CLASSIFIED DEFENSE ARTICLES § 125.6 Certification requirements for exemptions. (a) To claim an exemption for the export of technical data under the provisions of...

  12. 22 CFR 125.6 - Certification requirements for exemptions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    .... Certifications consist of clearly marking the package or letter containing the technical data “22 CFR [insert... LICENSES FOR THE EXPORT OF TECHNICAL DATA AND CLASSIFIED DEFENSE ARTICLES § 125.6 Certification requirements for exemptions. (a) To claim an exemption for the export of technical data under the provisions of...

  13. 22 CFR 125.6 - Certification requirements for exemptions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    .... Certifications consist of clearly marking the package or letter containing the technical data “22 CFR [insert... LICENSES FOR THE EXPORT OF TECHNICAL DATA AND CLASSIFIED DEFENSE ARTICLES § 125.6 Certification requirements for exemptions. (a) To claim an exemption for the export of technical data under the provisions of...

  14. Edwin I. Hatch nuclear plant implementation of improved technical specifications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mahler, S.R.; Pendry, D.

    1994-12-31

    Edwin I. Hatch nuclear plant consists of two General Electric boiling water reactor/4 units, with a common control room and a common refueling floor. In March 1993, Hatch began conversion of both units` technical specifications utilizing NUREG 1433. The technical specifications amendment request was submitted February 25, 1994. Issuance is scheduled for October 21, 1994, with implementation on March 15, 1994. The current unit-1 technical specifications are in the {open_quotes}custom{close_quotes} format, and the unit-2 technical specifications are in the old standard format. Hatch previously relocated the fire protection and radiological technical specifications requirements. The Hatch conversion will provide consistency betweenmore » the two units, to the extent practicable.« less

  15. Texas State Technical College Review.

    ERIC Educational Resources Information Center

    Aumack, Bruce; Blake, Larry J.

    Texas educational legislation for 1991 required the Texas Higher Education Coordinating Board (THECB) to review the operations of, and the continuing need for, each of the four main campuses and five extension centers of the Texas State Technical College System (TSTCS), and to make recommendations concerning the facilities' continuation and/or…

  16. 10 CFR 850.20 - Baseline beryllium inventory.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Baseline beryllium inventory. 850.20 Section 850.20 Energy... Baseline beryllium inventory. (a) The responsible employer must develop a baseline inventory of the locations of beryllium operations and other locations of potential beryllium contamination, and identify the...

  17. 48 CFR 306.303-1 - Requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Requirements. 306.303-1... ACQUISITION PLANNING COMPETITION REQUIREMENTS Other Than Full and Open Competition 306.303-1 Requirements. (b... written in a manner to permit an individual without technical knowledge of the requirement to understand...

  18. 48 CFR 6.303-1 - Requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Requirements. 6.303-1... COMPETITION REQUIREMENTS Other Than Full and Open Competition 6.303-1 Requirements. (a) A contracting officer... are made public after award in accordance with 6.305. (c) Technical and requirements personnel are...

  19. 48 CFR 306.303-1 - Requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Requirements. 306.303-1... ACQUISITION PLANNING COMPETITION REQUIREMENTS Other Than Full and Open Competition 306.303-1 Requirements. (b... written in a manner to permit an individual without technical knowledge of the requirement to understand...

  20. 48 CFR 306.303-1 - Requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Requirements. 306.303-1... ACQUISITION PLANNING COMPETITION REQUIREMENTS Other Than Full and Open Competition 306.303-1 Requirements. (b... written in a manner to permit an individual without technical knowledge of the requirement to understand...

  1. 48 CFR 306.303-1 - Requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Requirements. 306.303-1... ACQUISITION PLANNING COMPETITION REQUIREMENTS Other Than Full and Open Competition 306.303-1 Requirements. (b... written in a manner to permit an individual without technical knowledge of the requirement to understand...

  2. 48 CFR 306.303-1 - Requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Requirements. 306.303-1... ACQUISITION PLANNING COMPETITION REQUIREMENTS Other Than Full and Open Competition 306.303-1 Requirements. (b... written in a manner to permit an individual without technical knowledge of the requirement to understand...

  3. Time frequency requirements for radio interferometric earth physics

    NASA Technical Reports Server (NTRS)

    Thomas, J. B.; Fliegel, H. F.

    1973-01-01

    Two systems of VLBI (Very Long Baseline Interferometry) are now applicable to earth physics: an intercontinental baseline system using antennas of the NASA Deep Space Network, now observing at one-month intervals to determine UTI for spacecraft navigation; and a shorter baseline system called ARIES (Astronomical Radio Interferometric Earth Surveying), to be used to measure crustal movement in California for earthquake hazards estimation. On the basis of experience with the existing DSN system, a careful study has been made to estimate the time and frequency requirements of both the improved intercontinental system and of ARIES. Requirements for the two systems are compared and contrasted.

  4. Summary of engine design and analytical studies to mature the 1137400E engine baseline

    NASA Technical Reports Server (NTRS)

    Kleinert, D. E.; Lester, W. A.

    1972-01-01

    Activities in packaging components into integral module arrangements compatible with engine design requirements for the 1137400E flight engine baseline are summarized along with the applied mechanics and thermal analysis. Revisions to drawings, configurations, and support structures are discussed.

  5. 33 CFR 2.20 - Territorial sea baseline.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 1 2012-07-01 2012-07-01 false Territorial sea baseline. 2.20... JURISDICTION Jurisdictional Terms § 2.20 Territorial sea baseline. Territorial sea baseline means the line defining the shoreward extent of the territorial sea of the United States drawn according to the principles...

  6. 33 CFR 2.20 - Territorial sea baseline.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Territorial sea baseline. 2.20... JURISDICTION Jurisdictional Terms § 2.20 Territorial sea baseline. Territorial sea baseline means the line defining the shoreward extent of the territorial sea of the United States drawn according to the principles...

  7. 33 CFR 2.20 - Territorial sea baseline.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Territorial sea baseline. 2.20... JURISDICTION Jurisdictional Terms § 2.20 Territorial sea baseline. Territorial sea baseline means the line defining the shoreward extent of the territorial sea of the United States drawn according to the principles...

  8. 33 CFR 2.20 - Territorial sea baseline.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 1 2013-07-01 2013-07-01 false Territorial sea baseline. 2.20... JURISDICTION Jurisdictional Terms § 2.20 Territorial sea baseline. Territorial sea baseline means the line defining the shoreward extent of the territorial sea of the United States drawn according to the principles...

  9. 33 CFR 2.20 - Territorial sea baseline.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 1 2014-07-01 2014-07-01 false Territorial sea baseline. 2.20... JURISDICTION Jurisdictional Terms § 2.20 Territorial sea baseline. Territorial sea baseline means the line defining the shoreward extent of the territorial sea of the United States drawn according to the principles...

  10. A new estimator for VLBI baseline length repeatability

    NASA Astrophysics Data System (ADS)

    Titov, O.

    2009-11-01

    The goal of this paper is to introduce a more effective technique to approximate for the “repeatability-baseline length” relationship that is used to evaluate the quality of geodetic VLBI results. Traditionally, this relationship is approximated by a quadratic function of baseline length over all baselines. The new model incorporates the mean number of observed group delays of the reference radio sources (i.e. estimated as global parameters) used in the estimation of each baseline. It is shown that the new method provides a better approximation of the “repeatability-baseline length” relationship than the traditional model. Further development of the new approach comes down to modeling the repeatability as a function of two parameters: baseline length and baseline slewing rate. Within the framework of this new approach the station vertical and horizontal uncertainties can be treated as a function of baseline length. While the previous relationship indicated that the station vertical uncertainties are generally 4-5 times larger than the horizontal uncertainties, the vertical uncertainties as determined by the new method are only larger by a factor of 1.44 over all baseline lengths.

  11. Project Interface Requirements Process Including Shuttle Lessons Learned

    NASA Technical Reports Server (NTRS)

    Bauch, Garland T.

    2010-01-01

    Most failures occur at interfaces between organizations and hardware. Processing interface requirements at the start of a project life cycle will reduce the likelihood of costly interface changes/failures later. This can be done by adding Interface Control Documents (ICDs) to the Project top level drawing tree, providing technical direction to the Projects for interface requirements, and by funding the interface requirements function directly from the Project Manager's office. The interface requirements function within the Project Systems Engineering and Integration (SE&I) Office would work in-line with the project element design engineers early in the life cycle to enhance communications and negotiate technical issues between the elements. This function would work as the technical arm of the Project Manager to help ensure that the Project cost, schedule, and risk objectives can be met during the Life Cycle. Some ICD Lessons Learned during the Space Shuttle Program (SSP) Life Cycle will include the use of hardware interface photos in the ICD, progressive life cycle design certification by analysis, test, & operations experience, assigning interface design engineers to Element Interface (EI) and Project technical panels, and linking interface design drawings with project build drawings

  12. Baseline program

    NASA Technical Reports Server (NTRS)

    Roberts, Barney B.; Vonputtkamer, Jesco

    1992-01-01

    This assumed program was developed from several sources of information and is extrapolated over future decades using a set of reasonable assumptions based on incremental growth. The assumptions for the NASA baseline program are as follows: balanced emphasis in four domains; a constant level of activity; low to moderate real budget growth; maximum use of commonality; and realistic and practical technology development. The first domain is low Earth Orbit (LEO). Activities there are concentrated on the space station but extend on one side to Earth-pointing sensors for unmanned platforms and on the other to the launch and staging of unmanned solar system exploration missions. The second domain is geosynchronous Earth orbit (GEO) and cislunar space. Activities here include all GEO missions and operations, both unmanned and manned, and all transport of materials and crews between LEO and the vicinity of the Moon. The third domain is the Moon itself. Lunar activities are to include both orbiting and landing missions; the landings may be either unmanned or manned. The last domain is Mars. Missions to Mars will initially be unmanned but they will eventually be manned. Program elements and descriptions are discussed as are critiques of the NASA baseline.

  13. NASA Aerospace Flight Battery Program: Recommendations for Technical Requirements for Inclusion in Aerospace Battery Procurements. Volume 1, Part 2

    NASA Technical Reports Server (NTRS)

    Jung, David S.; Manzo, Michelle A.

    2010-01-01

    This NASA Aerospace Flight Battery Systems Working Group was chartered within the NASA Engineering and Safety Center (NESC). The Battery Working Group was tasked to complete tasks and to propose proactive work to address battery related, agency-wide issues on an annual basis. In its first year of operation, this proactive program addressed various aspects of the validation and verification of aerospace battery systems for NASA missions. Studies were performed, issues were discussed and in many cases, test programs were executed to generate recommendations and guidelines to reduce risk associated with various aspects of implementing battery technology in the aerospace industry. This document contains Part 2 - Volume I: Recommendations for Technical Requirements for Inclusion in Aerospace Battery Procurements of the program's operations.

  14. A baseline maritime satellite communication system

    NASA Technical Reports Server (NTRS)

    Durrani, S. H.; Mcgregor, D. N.

    1974-01-01

    This paper describes a baseline system for maritime communications via satellite during the 1980s. The system model employs three geostationary satellites with global coverage antennas. Access to the system is controlled by a master station; user access is based on time-ordered polling or random access. Each Thor-Delta launched satellite has an RF power of 100 W (spinner) or 250 W (three-axis stabilized), and provides 10 equivalent duplex voice channels for up to 1500 ships with average waiting times of approximately 2.5 minutes. The satellite capacity is bounded by the available bandwidth to 50 such channels, which can serve up to 10,000 ships with an average waiting time of 5 minutes. The ships must have peak antenna gains of approximately 15.5 dB or 22.5 dB for the two cases (10 or 50 voice channels) when a spinner satellite is used; the required gains are 4 dB lower if a three-axis stabilized satellite is used. The ship antenna requirements can be reduced by 8 to 10 dB by employing a high-gain multi-beam phased array antenna on the satellite.

  15. Lunar mission safety and rescue: Technical summary

    NASA Technical Reports Server (NTRS)

    1971-01-01

    A technical summary is presented of the escape/rescue and the hazards analyses for manned missions and operations in the 1980 time frame. Hazards are interpreted as hazards to man, not to equipment, program schedule, or program objectives. Hazards in 39 individual areas are analyzed, and corrective measures are recommended. Over 200 safety guidelines are proposed, based on significant hazards. Escape and rescue situtations and requirements are identified and analyzed, and escape/survival/rescue concepts are defined to cope with each escape/rescue situation. Areas in which research or technical development efforts could improve mission safety are identified. It is concluded that the primary emphasis should be on survival and escape provisions, with rescue required only where self-help cannot bring the endangered crewmen to a safe haven.

  16. Programs of Study: Year 2 Joint Technical Report. Research Snapshot

    ERIC Educational Resources Information Center

    National Research Center for Career and Technical Education, 2010

    2010-01-01

    In January 2010, the National Research Center for Career and Technical Education (NRCCTE) issued a progress report on three studies being conducted by the Center that examine the implementation and outcomes of Programs of Study (POS), which were required in the 2006 reauthorization of the federal legislation for career and technical education…

  17. Data Requirements Review Boards and Their Importance

    DTIC Science & Technology

    2016-02-01

    data: technical data, which are recorded technical or scientific information (not including computer software), and contractual or financial and...navy.mil. References for This Article and Other Useful Sources NAVAIRINST 4200.21E—Naval Air SystemsCommand Data Requirements Review Board DoD

  18. Reinforced Carbon Carbon (RCC) oxidation resistant material samples - Baseline coated, and baseline coated with tetraethyl orthosilicate (TEOS) impregnation

    NASA Technical Reports Server (NTRS)

    Gantz, E. E.

    1977-01-01

    Reinforced carbon-carbon material specimens were machined from 19 and 33 ply flat panels which were fabricated and processed in accordance with the specifications and procedures accepted for the fabrication and processing of the leading edge structural subsystem (LESS) elements for the space shuttle orbiter. The specimens were then baseline coated and tetraethyl orthosilicate impregnated, as applicable, in accordance with the procedures and requirements of the appropriate LESS production specifications. Three heater bars were ATJ graphite silicon carbide coated with the Vought 'pack cementation' coating process, and three were stackpole grade 2020 graphite silicon carbide coated with the chemical vapor deposition process utilized by Vought in coating the LESS shell development program entry heater elements. Nondestructive test results are reported.

  19. 10 CFR 61.59 - Institutional requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Technical Requirements for Land Disposal Facilities § 61.59 Institutional requirements. (a) Land ownership. Disposal of radioactive waste received from other persons may be permitted only on land owned in fee by the...

  20. 10 CFR 61.59 - Institutional requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Technical Requirements for Land Disposal Facilities § 61.59 Institutional requirements. (a) Land ownership. Disposal of radioactive waste received from other persons may be permitted only on land owned in fee by the...

  1. 10 CFR 61.59 - Institutional requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Technical Requirements for Land Disposal Facilities § 61.59 Institutional requirements. (a) Land ownership. Disposal of radioactive waste received from other persons may be permitted only on land owned in fee by the...

  2. 10 CFR 61.59 - Institutional requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Technical Requirements for Land Disposal Facilities § 61.59 Institutional requirements. (a) Land ownership. Disposal of radioactive waste received from other persons may be permitted only on land owned in fee by the...

  3. 10 CFR 61.59 - Institutional requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Technical Requirements for Land Disposal Facilities § 61.59 Institutional requirements. (a) Land ownership. Disposal of radioactive waste received from other persons may be permitted only on land owned in fee by the...

  4. Sources of Variance in Baseline Gene Expression in the Rodent Liver

    PubMed Central

    Corton, J. Christopher; Bushel, Pierre R.; Fostel, Jennifer; O'Lone, Raegan B.

    2012-01-01

    The use of gene expression profiling in both clinical and laboratory settings would be enhanced by better characterization of variation due to individual, environmental, and technical factors. Analysis of microarray data from untreated or vehicle-treated animals within the control arm of toxicogenomics studies has yielded useful information on baseline fluctuations in liver gene expression in the rodent. Here, studies which highlight contributions of different factors to gene expression variability in the rodent liver are discussed including a large meta-analysis of rat liver, which identified genes that vary in control animals in the absence of chemical treatment. Genes and their pathways that are the most and least variable were identified in a number of these studies. Life stage, fasting, sex, diet, circadian rhythm and liver lobe source can profoundly influence gene expression in the liver. Recognition of biological and technical factors that contribute to variability of background gene expression can help the investigator in the design of an experiment that maximizes sensitivity and reduces the influence of confounders that may lead to misinterpretation of genomic changes. The factors that contribute to variability in liver gene expression in rodents are likely analogous to those contributing to human interindividual variability in drug response and chemical toxicity. Identification of batteries of genes that are altered in a variety of background conditions could be used to predict responses to drugs and chemicals in appropriate models of the human liver. PMID:22230429

  5. 45 CFR 164.312 - Technical safeguards.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 1 2014-10-01 2014-10-01 false Technical safeguards. 164.312 Section 164.312 Public Welfare Department of Health and Human Services ADMINISTRATIVE DATA STANDARDS AND RELATED REQUIREMENTS SECURITY AND PRIVACY Security Standards for the Protection of Electronic Protected Health...

  6. Managing System of Systems Requirements with a Requirements Screening Group

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ronald R. Barden

    2012-07-01

    Figuring out an effective and efficient way to manage not only your Requirement’s Baseline, but also the development of all your individual requirements during a Program’s/Project’s Conceptual and Development Life Cycle Stages can be both daunting and difficult. This is especially so when you are dealing with a complex and large System of Systems (SoS) Program with potentially thousands and thousands of Top Level Requirements as well as an equal number of lower level System, Subsystem and Configuration Item requirements that need to be managed. This task is made even more overwhelming when you have to add in integration withmore » multiple requirements’ development teams (e.g., Integrated Product Development Teams (IPTs)) and/or numerous System/Subsystem Design Teams. One solution for tackling this difficult activity on a recent large System of Systems Program was to develop and make use of a Requirements Screening Group (RSG). This group is essentially a Team made up of co-chairs from the various Stakeholders with an interest in the Program of record that are enabled and accountable for Requirements Development on the Program/Project. The RSG co-chairs, often with the help of individual support team, work together as a Program Board to monitor, make decisions on, and provide guidance on all Requirements Development activities during the Conceptual and Development Life Cycle Stages of a Program/Project. In addition, the RSG can establish and maintain the Requirements Baseline, monitor and enforce requirements traceability across the entire Program, and work with other elements of the Program/Project to ensure integration and coordination.« less

  7. Propensity score to detect baseline imbalance in cluster randomized trials: the role of the c-statistic.

    PubMed

    Leyrat, Clémence; Caille, Agnès; Foucher, Yohann; Giraudeau, Bruno

    2016-01-22

    Despite randomization, baseline imbalance and confounding bias may occur in cluster randomized trials (CRTs). Covariate imbalance may jeopardize the validity of statistical inferences if they occur on prognostic factors. Thus, the diagnosis of a such imbalance is essential to adjust statistical analysis if required. We developed a tool based on the c-statistic of the propensity score (PS) model to detect global baseline covariate imbalance in CRTs and assess the risk of confounding bias. We performed a simulation study to assess the performance of the proposed tool and applied this method to analyze the data from 2 published CRTs. The proposed method had good performance for large sample sizes (n =500 per arm) and when the number of unbalanced covariates was not too small as compared with the total number of baseline covariates (≥40% of unbalanced covariates). We also provide a strategy for pre selection of the covariates needed to be included in the PS model to enhance imbalance detection. The proposed tool could be useful in deciding whether covariate adjustment is required before performing statistical analyses of CRTs.

  8. RESEARCH AND DEVELOPMENT PRIORITIES IN TECHNICAL EDUCATION, A REPORT OF A NATIONAL RESEARCH PLANNING CONFERENCE IN TECHNICAL EDUCATION (THE OHIO STATE UNIVERSITY, JANUARY 10-11, 1967).

    ERIC Educational Resources Information Center

    MILLER, AARON J.

    A SELECT GROUP OF PARTICIPANTS REPRESENTING NATIONAL LEADERSHIP IN BUSINESS, INDUSTRY, RESEARCH, GOVERNMENT, AND EDUCATION MET TO IDENTIFY SOME OF THE MOST OBVIOUS NEW EMERGING TECHNICAL OCCUPATIONS WHICH MIGHT REQUIRE RESEARCH AND DEVELOPMENT EFFORTS AND SOME OF THE MOST PRESSING RESEARCHABLE PROBLEM AREAS IN TECHNICAL EDUCATION. THE NEW OR…

  9. Comparison of Standards and Technical Requirements of Grid-Connected Wind Power Plants in China and the United States

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gao, David Wenzhong; Muljadi, Eduard; Tian, Tian

    The rapid deployment of wind power has made grid integration and operational issues focal points in industry discussions and research. Compliance with grid connection standards for wind power plants (WPPs) is crucial to ensuring the reliable and stable operation of the electric power grid. This report compares the standards for grid-connected WPPs in China to those in the United States to facilitate further improvements in wind power standards and enhance the development of wind power equipment. Detailed analyses of power quality, low-voltage ride-through capability, active power control, reactive power control, voltage control, and wind power forecasting are provided to enhancemore » the understanding of grid codes in the two largest markets of wind power. This study compares WPP interconnection standards and technical requirements in China to those in the United States.« less

  10. Technical Feasibility Assessment of Lunar Base Mission Scenarios

    NASA Astrophysics Data System (ADS)

    Magelssen, Trygve ``Spike''; Sadeh, Eligar

    2005-02-01

    Investigation of the literature pertaining to lunar base (LB) missions and the technologies required for LB development has revealed an information gap that hinders technical feasibility assessment. This information gap is the absence of technical readiness levels (TRL) (Mankins, 1995) and information pertaining to the criticality of the critical enabling technologies (CETs) that enable mission success. TRL is a means of identifying technical readiness stages of a technology. Criticality is defined as the level of influence the CET has on the mission scenario. The hypothesis of this research study is that technical feasibility is a function of technical readiness and technical readiness is a function of criticality. A newly developed research analysis method is used to identify the technical feasibility of LB mission scenarios. A Delphi is used to ascertain technical readiness levels and CET criticality-to-mission. The research analysis method is applied to the Delphi results to determine the technical feasibility of the LB mission scenarios that include: observatory, science research, lunar settlement, space exploration gateway, space resource utilization, and space tourism. The CETs identified encompasses four major system level technologies of: transportation, life support, structures, and power systems. Results of the technical feasibility assessment show the observatory and science research LB mission scenarios to be more technical ready out of all the scenarios, but all mission scenarios are in very close proximity to each other in regard to criticality and TRL and no one mission scenario stands out as being absolutely more technically ready than any of the other scenarios. What is significant and of value are the Delphi results concerning CET criticality-to-mission and the TRL values evidenced in the Tables that can be used by anyone assessing the technical feasibility of LB missions.

  11. Flight Technical Error Analysis of the SATS Higher Volume Operations Simulation and Flight Experiments

    NASA Technical Reports Server (NTRS)

    Williams, Daniel M.; Consiglio, Maria C.; Murdoch, Jennifer L.; Adams, Catherine H.

    2005-01-01

    This paper provides an analysis of Flight Technical Error (FTE) from recent SATS experiments, called the Higher Volume Operations (HVO) Simulation and Flight experiments, which NASA conducted to determine pilot acceptability of the HVO concept for normal operating conditions. Reported are FTE results from simulation and flight experiment data indicating the SATS HVO concept is viable and acceptable to low-time instrument rated pilots when compared with today s system (baseline). Described is the comparative FTE analysis of lateral, vertical, and airspeed deviations from the baseline and SATS HVO experimental flight procedures. Based on FTE analysis, all evaluation subjects, low-time instrument-rated pilots, flew the HVO procedures safely and proficiently in comparison to today s system. In all cases, the results of the flight experiment validated the results of the simulation experiment and confirm the utility of the simulation platform for comparative Human in the Loop (HITL) studies of SATS HVO and Baseline operations.

  12. Evaluating Technical Communication Faculty: Some Empirically-Based Criteria and Guidelines. Draft.

    ERIC Educational Resources Information Center

    Stevenson, Dwight W.

    As technical communication is a young academic discipline, evaluating technical communication faculty for promotion, tenure, and merit purposes requires special awareness and care. To determine reasonable expectations of faculty achievement, a study documented the range, types, and frequency of activities of 12 professors and 12 associate…

  13. [Discussion on Technical Evaluation for Medical Device Registration Material].

    PubMed

    Chu, Yungao; Qian, Hong; Zhu, Yingfeng

    2017-07-30

    This article first introduces the main contents of the requirements for medical device registration. Secondly, this article chooses the vertebral forming surgery system as an example to discuss the technical evaluation for the registration research material. The article hopes to provide a reference for the applicant who prepare the registration material and the technical evaluator who make the evaluation for the medical device registration.

  14. Communication Requirements of Employees of Business and Industry Represented by Areas of Technological Study at Southern Maine Vocational Technical Institute.

    ERIC Educational Resources Information Center

    Cary, Penny J.; Sweeney, Kevin F.

    A study examined the need and demand for communication skills for employees in the technical fields for which Southern Maine Vocational Technical Institute offers programs of academic preparation. Two members of the Institute's English Department interviewed representatives of organizations that have hired technical program graduates. Further…

  15. WEST VIRGINIA BASELINE

    EPA Science Inventory

    This report was prepared as part of the Ohio River Basin Energy Study (ORBES), a multidisciplinary policy research program supported by the Environmental Protection Agency. Its purpose is to provide baseline information on West Virginia, one of six states included partly or total...

  16. Cognitive training for technical and non-technical skills in robotic surgery: a randomised controlled trial.

    PubMed

    Raison, Nicholas; Ahmed, Kamran; Abe, Takashige; Brunckhorst, Oliver; Novara, Giacomo; Buffi, Nicolò; McIlhenny, Craig; van der Poel, Henk; van Hemelrijck, Mieke; Gavazzi, Andrea; Dasgupta, Prokar

    2018-05-07

    To investigate the effectiveness of motor imagery (MI) for technical skill and non-technical skill (NTS) training in minimally invasive surgery (MIS). A single-blind, parallel-group randomised controlled trial was conducted at the Vattikuti Institute of Robotic Surgery, King's College London. Novice surgeons were recruited by open invitation in 2015. After basic robotic skills training, participants underwent simple randomisation to either MI training or standard training. All participants completed a robotic urethrovesical anastomosis task within a simulated operating room. In addition to the technical task, participants were required to manage three scripted NTS scenarios. Assessment was performed by five blinded expert surgeons and a NTS expert using validated tools for evaluating technical skills [Global Evaluative Assessment of Robotic Skills (GEARS)] and NTS [Non-Technical Skills for Surgeons (NOTSS)]. Quality of MI was assessed using a revised Movement Imagery Questionnaire (MIQ). In all, 33 participants underwent MI training and 29 underwent standard training. Interrater reliability was high, Krippendorff's α = 0.85. After MI training, the mean (sd) GEARS score was significantly higher than after standard training, at 13.1 (3.25) vs 11.4 (2.97) (P = 0.03). There was no difference in mean NOTSS scores, at 25.8 vs 26.4 (P = 0.77). MI training was successful with significantly higher imagery scores than standard training (mean MIQ score 5.1 vs 4.5, P = 0.04). Motor imagery is an effective training tool for improving technical skill in MIS even in novice participants. No beneficial effect for NTS was found. © 2018 The Authors BJU International © 2018 BJU International Published by John Wiley & Sons Ltd.

  17. 76 FR 35231 - Notice of Proposed Information Collection for Public Comment; McKinney-Vento Technical Assistance...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-16

    ... Information Collection for Public Comment; McKinney-Vento Technical Assistance Narrative, Matrices, and... Narrative, Matrices, and Reporting Requirements. Description of the need for the information proposed: McKinney- Vento Technical Assistance (MV-TA) Narrative, Matrices, and Reporting Requirements will allow the...

  18. The Technical Communicator and ISO 9000.

    ERIC Educational Resources Information Center

    Weiss, Edmond H.

    1993-01-01

    Describes the complexities of ISO 9000, a set of generic quality standards to which any commercial firm wishing to do business with a member firm of the European Economic Community will have to comply. Describes opportunities for professional technical communicators in providing the required product documentation. (SR)

  19. Integration and baseline management training and transition plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jech, J.B.

    The purpose of the Integration and Baseline Management Training and Transition Plan is to provide a training outline for the Integration and Baseline Management (I and BM) organization and a transition strategy for the Master Equipment List (MEL) Phase 1 application. The training outline includes the following courses: MEL Phase 1 Application Course 1 Master Equipment List General Overview. Course 2 Master Equipment List Editing. Tank Waste Remediation System (TWRS) Labeling Related Course 3 TWRS Equipment Labeling Program (Course Number 350545). As part of courses 1, 2, and 3, it is recommended that a lesson plan be developed and integratedmore » into each of the three courses on the subject of Configuration Management (CM) to include: CM concepts, terminology, definitions, fundamentals and its application with respect to the course. The strategy for the MEL Phase 1 application is to train internal organizations (I and BM) on the MEL-General Overview for read only users and train MEL-Editing for edit users (only on an as needed basis). For external organizations, the strategy is to train selected personnel on the MEL-General Overview and transition them from read only privileges to editing privileges when the appropriate administrative procedures that outline the external organization`s responsibilities (to support MEL) are established. The purpose of this training is to ensure support of the I and BM organization objectives within the TV,IRS Division. These training courses will be added to the existing required training for I and BM personnel only. Other organizations implementing the training will be directed by their management on which training is required.« less

  20. Baseline tests for arc melter vitrification of INEL buried wastes. Volume II: Baseline test data appendices

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Oden, L.L.; O`Conner, W.K.; Turner, P.C.

    1993-11-19

    This report presents field results and raw data from the Buried Waste Integrated Demonstration (BWID) Arc Melter Vitrification Project Phase 1 baseline test series conducted by the Idaho National Engineering Laboratory (INEL) in cooperation with the U.S. Bureau of Mines (USBM). The baseline test series was conducted using the electric arc melter facility at the USBM Albany Research Center in Albany, Oregon. Five different surrogate waste feed mixtures were tested that simulated thermally-oxidized, buried, TRU-contaminated, mixed wastes and soils present at the INEL. The USBM Arc Furnace Integrated Waste Processing Test Facility includes a continuous feed system, the arc meltingmore » furnace, an offgas control system, and utilities. The melter is a sealed, 3-phase alternating current (ac) furnace approximately 2 m high and 1.3 m wide. The furnace has a capacity of 1 metric ton of steel and can process as much as 1,500 lb/h of soil-type waste materials. The surrogate feed materials included five mixtures designed to simulate incinerated TRU-contaminated buried waste materials mixed with INEL soil. Process samples, melter system operations data and offgas composition data were obtained during the baseline tests to evaluate the melter performance and meet test objectives. Samples and data gathered during this program included (a) automatically and manually logged melter systems operations data, (b) process samples of slag, metal and fume solids, and (c) offgas composition, temperature, velocity, flowrate, moisture content, particulate loading and metals content. This report consists of 2 volumes: Volume I summarizes the baseline test operations. It includes an executive summary, system and facility description, review of the surrogate waste mixtures, and a description of the baseline test activities, measurements, and sample collection. Volume II contains the raw test data and sample analyses from samples collected during the baseline tests.« less