Sample records for technical performance schedule

  1. Optimizing Music Learning: Exploring How Blocked and Interleaved Practice Schedules Affect Advanced Performance.

    PubMed

    Carter, Christine E; Grahn, Jessica A

    2016-01-01

    Repetition is the most commonly used practice strategy by musicians. Although blocks of repetition continue to be suggested in the pedagogical literature, work in the field of cognitive psychology suggests that repeated events receive less processing, thereby reducing the potential for long-term learning. Motor skill learning and sport psychology research offer an alternative. Instead of using a blocked practice schedule, with practice completed on one task before moving on to the next task, an interleaved schedule can be used, in which practice is frequently alternated between tasks. This frequent alternation involves more effortful processing, resulting in increased long-term learning. The finding that practicing in an interleaved schedule leads to better retention than practicing in a blocked schedule has been labeled the "contextual interference effect." While the effect has been observed across a wide variety of fields, few studies have researched this phenomenon in a music-learning context, despite the broad potential for application to music practice. This study compared the effects of blocked and interleaved practice schedules on advanced clarinet performance in an ecologically valid context. Ten clarinetists were given one concerto exposition and one technical excerpt to practice in a blocked schedule (12 min per piece) and a second concerto exposition and technical excerpt to practice in an interleaved schedule (3 min per piece, alternating until a total of 12 min of practice were completed on each piece). Participants sight-read the four pieces prior to practice and performed them at the end of practice and again one day later. The sight-reading and two performance run-throughs of each piece were recorded and given to three professional clarinetists to rate using a percentage scale. Overall, whenever there was a ratings difference between the conditions, pieces practiced in the interleaved schedule were rated better than those in the blocked schedule

  2. Optimizing Music Learning: Exploring How Blocked and Interleaved Practice Schedules Affect Advanced Performance

    PubMed Central

    Carter, Christine E.; Grahn, Jessica A.

    2016-01-01

    Repetition is the most commonly used practice strategy by musicians. Although blocks of repetition continue to be suggested in the pedagogical literature, work in the field of cognitive psychology suggests that repeated events receive less processing, thereby reducing the potential for long-term learning. Motor skill learning and sport psychology research offer an alternative. Instead of using a blocked practice schedule, with practice completed on one task before moving on to the next task, an interleaved schedule can be used, in which practice is frequently alternated between tasks. This frequent alternation involves more effortful processing, resulting in increased long-term learning. The finding that practicing in an interleaved schedule leads to better retention than practicing in a blocked schedule has been labeled the “contextual interference effect.” While the effect has been observed across a wide variety of fields, few studies have researched this phenomenon in a music-learning context, despite the broad potential for application to music practice. This study compared the effects of blocked and interleaved practice schedules on advanced clarinet performance in an ecologically valid context. Ten clarinetists were given one concerto exposition and one technical excerpt to practice in a blocked schedule (12 min per piece) and a second concerto exposition and technical excerpt to practice in an interleaved schedule (3 min per piece, alternating until a total of 12 min of practice were completed on each piece). Participants sight-read the four pieces prior to practice and performed them at the end of practice and again one day later. The sight-reading and two performance run-throughs of each piece were recorded and given to three professional clarinetists to rate using a percentage scale. Overall, whenever there was a ratings difference between the conditions, pieces practiced in the interleaved schedule were rated better than those in the blocked schedule

  3. 2016 Rio Olympic Games: Can the schedule of events compromise athletes' performance?

    PubMed

    Rosa, João Paulo P; Rodrigues, Dayane F; Silva, Andressa; de Moura Simim, Mário Antônio; Costa, Varley T; Noce, Franco; de Mello, Marco Túlio

    2016-01-01

    The organizing committee of the 2016 Rio Olympic Games recently announced that some of the preliminary and final competitions will be held at night. The present article discusses the potential harmful effects of these late-night competitions on sleep, circadian rhythms and athletic performance during the Olympic Games. Specifically, night-time competition could lead to injury and may compromise an athlete's decision-making, attentional, physiological and other processes. Consequently, these impacts could negatively affect the performance of athletes and their teams. Thus, it is suggested that technical commissions take special care when creating strategies to minimize harm to the athletes by considering factors such as light exposure, melatonin intake, sleep hygiene and scheduled naps, and training at local competition time. Furthermore, it is necessary for specialists in chronobiology and sleep to engage with members of the national teams to develop an activity schedule for physical, technical, tactical and psychological preparation that accounts for circadian rhythms, thereby creating the best possible environment for the athletes to achieve their ideal performance.

  4. Technical Feasibility of a Mobile Context-Aware (Social) Learning Schedule Framework

    ERIC Educational Resources Information Center

    Yau, Jane Y. K.; Joy, Mike

    2013-01-01

    The purpose of this paper is to show the technical feasibility of implementing their mobile context-aware learning schedule (mCALS) framework as a software application on a mobile device using current technologies, prior to its actual implementation. This process draws a set of compatible mobile and context-aware technologies at present and can be…

  5. Performance analysis of a large-grain dataflow scheduling paradigm

    NASA Technical Reports Server (NTRS)

    Young, Steven D.; Wills, Robert W.

    1993-01-01

    A paradigm for scheduling computations on a network of multiprocessors using large-grain data flow scheduling at run time is described and analyzed. The computations to be scheduled must follow a static flow graph, while the schedule itself will be dynamic (i.e., determined at run time). Many applications characterized by static flow exist, and they include real-time control and digital signal processing. With the advent of computer-aided software engineering (CASE) tools for capturing software designs in dataflow-like structures, macro-dataflow scheduling becomes increasingly attractive, if not necessary. For parallel implementations, using the macro-dataflow method allows the scheduling to be insulated from the application designer and enables the maximum utilization of available resources. Further, by allowing multitasking, processor utilizations can approach 100 percent while they maintain maximum speedup. Extensive simulation studies are performed on 4-, 8-, and 16-processor architectures that reflect the effects of communication delays, scheduling delays, algorithm class, and multitasking on performance and speedup gains.

  6. The Effects of Varying Schedules of Incentive Delivery on Technical Training.

    ERIC Educational Resources Information Center

    Pritchard, Robert D.; And Others

    The research reported here was initiated and designed to assess the impact of various schedules of incentive delivery (schedules of reinforcement) on performance and attitudes in an Air Force-related setting. Civilian subjects matching the characteristics of Air Force trainees were hired to work for four weeks, one week under each of four…

  7. Schedule Matters: Understanding the Relationship between Schedule Delays and Costs on Overruns

    NASA Technical Reports Server (NTRS)

    Majerowicz, Walt; Shinn, Stephen A.

    2016-01-01

    This paper examines the relationship between schedule delays and cost overruns on complex projects. It is generally accepted by many project practitioners that cost overruns are directly related to schedule delays. But what does "directly related to" actually mean? Some reasons or root causes for schedule delays and associated cost overruns are obvious, if only in hindsight. For example, unrealistic estimates, supply chain difficulties, insufficient schedule margin, technical problems, scope changes, or the occurrence of risk events can negatively impact schedule performance. Other factors driving schedule delays and cost overruns may be less obvious and more difficult to quantify. Examples of these less obvious factors include project complexity, flawed estimating assumptions, over-optimism, political factors, "black swan" events, or even poor leadership and communication. Indeed, is it even possible the schedule itself could be a source of delay and subsequent cost overrun? Through literature review, surveys of project practitioners, and the authors' own experience on NASA programs and projects, the authors will categorize and examine the various factors affecting the relationship between project schedule delays and cost growth. The authors will also propose some ideas for organizations to consider to help create an awareness of the factors which could cause or influence schedule delays and associated cost growth on complex projects.

  8. Using Technical Performance Measures

    NASA Technical Reports Server (NTRS)

    Garrett, Christopher J.; Levack, Daniel J. H.; Rhodes, Russel E.

    2011-01-01

    All programs have requirements. For these requirements to be met, there must be a means of measurement. A Technical Performance Measure (TPM) is defined to produce a measured quantity that can be compared to the requirement. In practice, the TPM is often expressed as a maximum or minimum and a goal. Example TPMs for a rocket program are: vacuum or sea level specific impulse (lsp), weight, reliability (often expressed as a failure rate), schedule, operability (turn-around time), design and development cost, production cost, and operating cost. Program status is evaluated by comparing the TPMs against specified values of the requirements. During the program many design decisions are made and most of them affect some or all of the TPMs. Often, the same design decision changes some TPMs favorably while affecting other TPMs unfavorably. The problem then becomes how to compare the effects of a design decision on different TPMs. How much failure rate is one second of specific impulse worth? How many days of schedule is one pound of weight worth? In other words, how to compare dissimilar quantities in order to trade and manage the TPMs to meet all requirements. One method that has been used successfully and has a mathematical basis is Utility Analysis. Utility Analysis enables quantitative comparison among dissimilar attributes. It uses a mathematical model that maps decision maker preferences over the tradeable range of each attribute. It is capable of modeling both independent and dependent attributes. Utility Analysis is well supported in the literature on Decision Theory. It has been used at Pratt & Whitney Rocketdyne for internal programs and for contracted work such as the J-2X rocket engine program. This paper describes the construction of TPMs and describes Utility Analysis. It then discusses the use of TPMs in design trades and to manage margin during a program using Utility Analysis.

  9. Job Scheduling in a Heterogeneous Grid Environment

    NASA Technical Reports Server (NTRS)

    Shan, Hong-Zhang; Smith, Warren; Oliker, Leonid; Biswas, Rupak

    2004-01-01

    Computational grids have the potential for solving large-scale scientific problems using heterogeneous and geographically distributed resources. However, a number of major technical hurdles must be overcome before this potential can be realized. One problem that is critical to effective utilization of computational grids is the efficient scheduling of jobs. This work addresses this problem by describing and evaluating a grid scheduling architecture and three job migration algorithms. The architecture is scalable and does not assume control of local site resources. The job migration policies use the availability and performance of computer systems, the network bandwidth available between systems, and the volume of input and output data associated with each job. An extensive performance comparison is presented using real workloads from leading computational centers. The results, based on several key metrics, demonstrate that the performance of our distributed migration algorithms is significantly greater than that of a local scheduling framework and comparable to a non-scalable global scheduling approach.

  10. Sleep and performance in simulated Navy watch schedules.

    PubMed

    Skornyakov, Elena; Shattuck, Nita L; Winser, Michael A; Matsangas, Panagiotis; Sparrow, Amy R; Layton, Matthew E; Gabehart, Rylie J; Van Dongen, Hans P A

    2017-02-01

    To operate Navy ships 24h per day, watchstanding is needed around the clock, with watch periods reflecting a variety of rotating or fixed shift schedules. The 5/15 watch schedule cycles through watch periods with 5h on, 15h off watch, such that watches occur 4h earlier on the clock each day - that is, the watches rotate backward. The timing of sleep varies over 4-day cycles, and sleep is split on some days to accommodate nighttime watchstanding. The 3/9 watch schedule cycles through watch periods with 3h on, 9h off watch, allowing for consistent sleep timing over days. In some sections of the 3/9 watch schedule, sleep may need to be split to accommodate nighttime watchstanding. In both the 5/15 and 3/9 watch schedules, four watch sections alternate to cover the 24h of the day. Here we compared sleep duration, psychomotor vigilance and subjective sleepiness in simulated sections of the 5/15 and 3/9 watch schedules. Fifteen healthy male subjects spent 6 consecutive days (5 nights) in the laboratory. Sleep opportunities were restricted to an average of 6.5h daily. Actigraphically estimated sleep duration was 5.6h per watch day on average, with no significant difference between watch sections. Sleep duration was not reduced when sleep opportunities were split. Psychomotor vigilance degraded over watch days, and tended to be more variable in the 5/15 than in the 3/9 watch sections. These laboratory-based findings suggest that Navy watch schedules are associated with cumulative sleep loss and a build-up of fatigue across days. The fixed watch periods of the 3/9 watch schedule appear to yield more stable performance than the backward rotating watch periods of the 5/15 watch schedule. Optimal performance may require longer and more consistent daily opportunities for sleep than are typically obtained in Navy operations. Copyright © 2015 Elsevier Ltd. All rights reserved.

  11. Sleep schedules and school performance in Indigenous Australian children.

    PubMed

    Blunden, Sarah; Magee, Chris; Attard, Kelly; Clarkson, Larissa; Caputi, Peter; Skinner, Timothy

    2018-04-01

    Sleep duration and sleep schedule variability have been related to negative health and well-being outcomes in children, but little is known about Australian Indigenous children. Data for children aged 7-9 years came from the Australian Longitudinal Study of Indigenous Children and the National Assessment Program-Literacy and Numeracy (NAPLAN). Latent class analysis determined sleep classes taking into account sleep duration, bedtimes, waketimes, and variability in bedtimes from weekdays to weekends. Regression models tested whether the sleep classes were cross-sectionally associated with grade 3 NAPLAN scores. Latent change score modeling then examined whether the sleep classes predicted changes in NAPLAN performance from grades 3 to 5. Five sleep schedule classes were identified: normative sleep, early risers, long sleep, variable sleep, and short sleep. Overall, long sleepers performed best, with those with reduced sleep (short sleepers and early risers) performing the worse on grammar, numeracy, and writing performance. Latent change score results also showed that long sleepers performed best in spelling and writing and short sleepers and typical sleepers performed the worst over time. In this sample of Australian Indigenous children, short sleep was associated with poorer school performance compared with long sleep, with this performance worsening over time for some performance indicators. Other sleep schedules (eg, early wake times and variable sleep) also had some relationships with school performance. As sleep scheduling is modifiable, this offers opportunity for improvement in sleep and thus performance outcomes for these and potentially all children. Copyright © 2018 National Sleep Foundation. Published by Elsevier Inc. All rights reserved.

  12. Relationship between intraoperative non-technical performance and technical events in bariatric surgery.

    PubMed

    Fecso, A B; Kuzulugil, S S; Babaoglu, C; Bener, A B; Grantcharov, T P

    2018-03-30

    The operating theatre is a unique environment with complex team interactions, where technical and non-technical performance affect patient outcomes. The correlation between technical and non-technical performance, however, remains underinvestigated. The purpose of this study was to explore these interactions in the operating theatre. A prospective single-centre observational study was conducted at a tertiary academic medical centre. One surgeon and three fellows participated as main operators. All patients who underwent a laparoscopic Roux-en-Y gastric bypass and had the procedures captured using the Operating Room Black Box ® platform were included. Technical assessment was performed using the Objective Structured Assessment of Technical Skills and Generic Error Rating Tool instruments. For non-technical assessment, the Non-Technical Skills for Surgeons (NOTSS) and Scrub Practitioners' List of Intraoperative Non-Technical Skills (SPLINTS) tools were used. Spearman rank-order correlation and N-gram statistics were conducted. Fifty-six patients were included in the study and 90 procedural steps (gastrojejunostomy and jejunojejunostomy) were analysed. There was a moderate to strong correlation between technical adverse events (r s  = 0·417-0·687), rectifications (r s  = 0·380-0·768) and non-technical performance of the surgical and nursing teams (NOTSS and SPLINTS). N-gram statistics showed that after technical errors, events and prior rectifications, the staff surgeon and the scrub nurse exhibited the most positive non-technical behaviours, irrespective of operator (staff surgeon or fellow). This study demonstrated that technical and non-technical performances are related, on both an individual and a team level. Valuable data can be obtained around intraoperative errors, events and rectifications. © 2018 BJS Society Ltd Published by John Wiley & Sons Ltd.

  13. The effects of a split sleep-wake schedule on neurobehavioural performance and predictions of performance under conditions of forced desynchrony.

    PubMed

    Kosmadopoulos, Anastasi; Sargent, Charli; Darwent, David; Zhou, Xuan; Dawson, Drew; Roach, Gregory D

    2014-12-01

    Extended wakefulness, sleep loss, and circadian misalignment are factors associated with an increased accident risk in shiftwork. Splitting shifts into multiple shorter periods per day may mitigate these risks by alleviating prior wake. However, the effect of splitting the sleep-wake schedule on the homeostatic and circadian contributions to neurobehavioural performance and subjective assessments of one's ability to perform are not known. Twenty-nine male participants lived in a time isolation laboratory for 13 d, assigned to one of two 28-h forced desynchrony (FD) schedules. Depending on the assigned schedule, participants were provided the same total time in bed (TIB) each FD cycle, either consolidated into a single period (9.33 h TIB) or split into two equal halves (2 × 4.67 h TIB). Neurobehavioural performance was regularly assessed with a psychomotor vigilance task (PVT) and subjectively-assessed ability was measured with a prediction of performance on a visual analogue scale. Polysomnography was used to assess sleep, and core body temperature was recorded to assess circadian phase. On average, participants obtained the same amount of sleep in both schedules, but those in the split schedule obtained more slow wave sleep (SWS) on FD days. Mixed-effects ANOVAs indicated no overall difference between the standard and split schedules in neurobehavioural performance or predictions of performance. Main effects of circadian phase and prior wake were present for both schedules, such that performance and subjective ratings of ability were best around the circadian acrophase, worst around the nadir, and declined with increasing prior wake. There was a schedule by circadian phase interaction for all neurobehavioural performance metrics such that performance was better in the split schedule than the standard schedule around the nadir. There was no such interaction for predictions of performance. Performance during the standard schedule was significantly better

  14. High performance techniques for space mission scheduling

    NASA Technical Reports Server (NTRS)

    Smith, Stephen F.

    1994-01-01

    In this paper, we summarize current research at Carnegie Mellon University aimed at development of high performance techniques and tools for space mission scheduling. Similar to prior research in opportunistic scheduling, our approach assumes the use of dynamic analysis of problem constraints as a basis for heuristic focusing of problem solving search. This methodology, however, is grounded in representational assumptions more akin to those adopted in recent temporal planning research, and in a problem solving framework which similarly emphasizes constraint posting in an explicitly maintained solution constraint network. These more general representational assumptions are necessitated by the predominance of state-dependent constraints in space mission planning domains, and the consequent need to integrate resource allocation and plan synthesis processes. First, we review the space mission problems we have considered to date and indicate the results obtained in these application domains. Next, we summarize recent work in constraint posting scheduling procedures, which offer the promise of better future solutions to this class of problems.

  15. LPV Controller Interpolation for Improved Gain-Scheduling Control Performance

    NASA Technical Reports Server (NTRS)

    Wu, Fen; Kim, SungWan

    2002-01-01

    In this paper, a new gain-scheduling control design approach is proposed by combining LPV (linear parameter-varying) control theory with interpolation techniques. The improvement of gain-scheduled controllers can be achieved from local synthesis of Lyapunov functions and continuous construction of a global Lyapunov function by interpolation. It has been shown that this combined LPV control design scheme is capable of improving closed-loop performance derived from local performance improvement. The gain of the LPV controller will also change continuously across parameter space. The advantages of the newly proposed LPV control is demonstrated through a detailed AMB controller design example.

  16. An assessment of PERT as a technique for schedule planning and control

    NASA Technical Reports Server (NTRS)

    Sibbers, C. W.

    1982-01-01

    The PERT technique including the types of reports which can be computer generated using the NASA/LaRC PPARS System is described. An assessment is made of the effectiveness of PERT on various types of efforts as well as for specific purposes, namely, schedule planning, schedule analysis, schedule control, monitoring contractor schedule performance, and management reporting. This assessment is based primarily on the author's knowledge of the usage of PERT by NASA/LaRC personnel since the early 1960's. Both strengths and weaknesses of the technique for various applications are discussed. It is intended to serve as a reference guide for personnel performing project planning and control functions and technical personnel whose responsibilities either include schedule planning and control or require a general knowledge of the subject.

  17. Planning and scheduling lessons learned study, executive summary

    NASA Technical Reports Server (NTRS)

    Robinson, Toni

    1990-01-01

    The study was performed to document the lessons on planning and scheduling activities for a number of missions and institutional facilities in such a way that they can be applied to future missions; to provide recommendations to both projects and Code 500 that will improve the end-to-end planning and scheduling process; and to identify what, if any, mission characteristics might be related to certain lessons learned. The results are a series of recommendations of both a managerial and technical nature related to the underlying lessons learned.

  18. Multi-core processing and scheduling performance in CMS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hernandez, J. M.; Evans, D.; Foulkes, S.

    2012-01-01

    Commodity hardware is going many-core. We might soon not be able to satisfy the job memory needs per core in the current single-core processing model in High Energy Physics. In addition, an ever increasing number of independent and incoherent jobs running on the same physical hardware not sharing resources might significantly affect processing performance. It will be essential to effectively utilize the multi-core architecture. CMS has incorporated support for multi-core processing in the event processing framework and the workload management system. Multi-core processing jobs share common data in memory, such us the code libraries, detector geometry and conditions data, resultingmore » in a much lower memory usage than standard single-core independent jobs. Exploiting this new processing model requires a new model in computing resource allocation, departing from the standard single-core allocation for a job. The experiment job management system needs to have control over a larger quantum of resource since multi-core aware jobs require the scheduling of multiples cores simultaneously. CMS is exploring the approach of using whole nodes as unit in the workload management system where all cores of a node are allocated to a multi-core job. Whole-node scheduling allows for optimization of the data/workflow management (e.g. I/O caching, local merging) but efficient utilization of all scheduled cores is challenging. Dedicated whole-node queues have been setup at all Tier-1 centers for exploring multi-core processing workflows in CMS. We present the evaluation of the performance scheduling and executing multi-core workflows in whole-node queues compared to the standard single-core processing workflows.« less

  19. Multi-core processing and scheduling performance in CMS

    NASA Astrophysics Data System (ADS)

    Hernández, J. M.; Evans, D.; Foulkes, S.

    2012-12-01

    Commodity hardware is going many-core. We might soon not be able to satisfy the job memory needs per core in the current single-core processing model in High Energy Physics. In addition, an ever increasing number of independent and incoherent jobs running on the same physical hardware not sharing resources might significantly affect processing performance. It will be essential to effectively utilize the multi-core architecture. CMS has incorporated support for multi-core processing in the event processing framework and the workload management system. Multi-core processing jobs share common data in memory, such us the code libraries, detector geometry and conditions data, resulting in a much lower memory usage than standard single-core independent jobs. Exploiting this new processing model requires a new model in computing resource allocation, departing from the standard single-core allocation for a job. The experiment job management system needs to have control over a larger quantum of resource since multi-core aware jobs require the scheduling of multiples cores simultaneously. CMS is exploring the approach of using whole nodes as unit in the workload management system where all cores of a node are allocated to a multi-core job. Whole-node scheduling allows for optimization of the data/workflow management (e.g. I/O caching, local merging) but efficient utilization of all scheduled cores is challenging. Dedicated whole-node queues have been setup at all Tier-1 centers for exploring multi-core processing workflows in CMS. We present the evaluation of the performance scheduling and executing multi-core workflows in whole-node queues compared to the standard single-core processing workflows.

  20. Machine Learning Based Online Performance Prediction for Runtime Parallelization and Task Scheduling

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Li, J; Ma, X; Singh, K

    2008-10-09

    With the emerging many-core paradigm, parallel programming must extend beyond its traditional realm of scientific applications. Converting existing sequential applications as well as developing next-generation software requires assistance from hardware, compilers and runtime systems to exploit parallelism transparently within applications. These systems must decompose applications into tasks that can be executed in parallel and then schedule those tasks to minimize load imbalance. However, many systems lack a priori knowledge about the execution time of all tasks to perform effective load balancing with low scheduling overhead. In this paper, we approach this fundamental problem using machine learning techniques first to generatemore » performance models for all tasks and then applying those models to perform automatic performance prediction across program executions. We also extend an existing scheduling algorithm to use generated task cost estimates for online task partitioning and scheduling. We implement the above techniques in the pR framework, which transparently parallelizes scripts in the popular R language, and evaluate their performance and overhead with both a real-world application and a large number of synthetic representative test scripts. Our experimental results show that our proposed approach significantly improves task partitioning and scheduling, with maximum improvements of 21.8%, 40.3% and 22.1% and average improvements of 15.9%, 16.9% and 4.2% for LMM (a real R application) and synthetic test cases with independent and dependent tasks, respectively.« less

  1. The Business Change Initiative: A Novel Approach to Improved Cost and Schedule Management

    NASA Technical Reports Server (NTRS)

    Shinn, Stephen A.; Bryson, Jonathan; Klein, Gerald; Lunz-Ruark, Val; Majerowicz, Walt; McKeever, J.; Nair, Param

    2016-01-01

    Goddard Space Flight Center's Flight Projects Directorate employed a Business Change Initiative (BCI) to infuse a series of activities coordinated to drive improved cost and schedule performance across Goddard's missions. This sustaining change framework provides a platform to manage and implement cost and schedule control techniques throughout the project portfolio. The BCI concluded in December 2014, deploying over 100 cost and schedule management changes including best practices, tools, methods, training, and knowledge sharing. The new business approach has driven the portfolio to improved programmatic performance. The last eight launched GSFC missions have optimized cost, schedule, and technical performance on a sustained basis to deliver on time and within budget, returning funds in many cases. While not every future mission will boast such strong performance, improved cost and schedule tools, management practices, and ongoing comprehensive evaluations of program planning and control methods to refine and implement best practices will continue to provide a framework for sustained performance. This paper will describe the tools, techniques, and processes developed during the BCI and the utilization of collaborative content management tools to disseminate project planning and control techniques to ensure continuous collaboration and optimization of cost and schedule management in the future.

  2. Performance comparison of some evolutionary algorithms on job shop scheduling problems

    NASA Astrophysics Data System (ADS)

    Mishra, S. K.; Rao, C. S. P.

    2016-09-01

    Job Shop Scheduling as a state space search problem belonging to NP-hard category due to its complexity and combinational explosion of states. Several naturally inspire evolutionary methods have been developed to solve Job Shop Scheduling Problems. In this paper the evolutionary methods namely Particles Swarm Optimization, Artificial Intelligence, Invasive Weed Optimization, Bacterial Foraging Optimization, Music Based Harmony Search Algorithms are applied and find tuned to model and solve Job Shop Scheduling Problems. To compare about 250 Bench Mark instances have been used to evaluate the performance of these algorithms. The capabilities of each these algorithms in solving Job Shop Scheduling Problems are outlined.

  3. Strategic behavior, workload, and performance in task scheduling

    NASA Technical Reports Server (NTRS)

    Moray, Neville; Dessouky, Mohamed I.; Kijowski, Brian A.; Adapathya, Ravi

    1991-01-01

    Scheduling theory is proposed as a normative model for strategic behavior when operators are confronted by several tasks, all of which should be completed within a fixed time span, and when they are free to choose the order in which the tasks should be done. Three experiments are described to investigate the effect of knowing the correct scheduling rule on the efficiency of performance, subjective workload, and choice of strategy under different conditions of time pressure. The most potent effects are from time pressure. The reasons for the weak effect of knowing the rules are discussed, and implications for strategic behavior, displays, and decision aids are indicated.

  4. Burbank performs the scheduled extensive cleanup of ventilation systems

    NASA Image and Video Library

    2012-02-22

    ISS030-E-093414 (22 Feb. 2012) --- NASA astronaut Dan Burbank, Expedition 30 commander, performs the scheduled extensive cleanup of ventilation systems in the Columbus laboratory of the International Space Station.

  5. Effect of Reinforcer Magnitude on Performance Maintained by Progressive-Ratio Schedules

    ERIC Educational Resources Information Center

    Rickard, J. F.; Body, S.; Zhang, Z.; Bradshaw, C. M.; Szabadi, E.

    2009-01-01

    This experiment examined the relationship between reinforcer magnitude and quantitative measures of performance on progressive-ratio schedules. Fifteen rats were trained under a progressive-ratio schedule in seven phases of the experiment in which the volume of a 0.6-M sucrose solution reinforcer was varied within the range 6-300 microliters.…

  6. Relationship between non-technical skills and technical performance during cardiopulmonary resuscitation: does stress have an influence?

    PubMed Central

    Krage, Ralf; Zwaan, Laura; Tjon Soei Len, Lian; Kolenbrander, Mark W; van Groeningen, Dick; Loer, Stephan A; Wagner, Cordula; Schober, Patrick

    2017-01-01

    Background Non-technical skills, such as task management, leadership, situational awareness, communication and decision-making refer to cognitive, behavioural and social skills that contribute to safe and efficient team performance. The importance of these skills during cardiopulmonary resuscitation (CPR) is increasingly emphasised. Nonetheless, the relationship between non-technical skills and technical performance is poorly understood. We hypothesise that non-technical skills become increasingly important under stressful conditions when individuals are distracted from their tasks, and investigated the relationship between non-technical and technical skills under control conditions and when external stressors are present. Methods In this simulator-based randomised cross-over study, 30 anaesthesiologists and anaesthesia residents from the VU University Medical Center, Amsterdam, the Netherlands, participated in two different CPR scenarios in random order. In one scenario, external stressors (radio noise and a distractive scripted family member) were added, while the other scenario without stressors served as control condition. Non-technical performance of the team leader and technical performance of the team were measured using the ‘Anaesthetists’ Non-technical Skill’ score and a recently developed technical skills score. Analysis of variance and Pearson correlation coefficients were used for statistical analyses. Results Non-technical performance declined when external stressors were present (adjusted mean difference 3.9 points, 95% CI 2.4 to 5.5 points). A significant correlation between non-technical and technical performance scores was observed when external stressors were present (r=0.67, 95% CI 0.40 to 0.83, p<0.001), while no evidence for such a relationship was observed under control conditions (r=0.15, 95% CI −0.22 to 0.49, p=0.42). This was equally true for all individual domains of the non-technical performance score (task management, team

  7. Applying mathematical models to predict resident physician performance and alertness on traditional and novel work schedules.

    PubMed

    Klerman, Elizabeth B; Beckett, Scott A; Landrigan, Christopher P

    2016-09-13

    In 2011 the U.S. Accreditation Council for Graduate Medical Education began limiting first year resident physicians (interns) to shifts of ≤16 consecutive hours. Controversy persists regarding the effectiveness of this policy for reducing errors and accidents while promoting education and patient care. Using a mathematical model of the effects of circadian rhythms and length of time awake on objective performance and subjective alertness, we quantitatively compared predictions for traditional intern schedules to those that limit work to ≤ 16 consecutive hours. We simulated two traditional schedules and three novel schedules using the mathematical model. The traditional schedules had extended duration work shifts (≥24 h) with overnight work shifts every second shift (including every third night, Q3) or every third shift (including every fourth night, Q4) night; the novel schedules had two different cross-cover (XC) night team schedules (XC-V1 and XC-V2) and a Rapid Cycle Rotation (RCR) schedule. Predicted objective performance and subjective alertness for each work shift were computed for each individual's schedule within a team and then combined for the team as a whole. Our primary outcome was the amount of time within a work shift during which a team's model-predicted objective performance and subjective alertness were lower than that expected after 16 or 24 h of continuous wake in an otherwise rested individual. The model predicted fewer hours with poor performance and alertness, especially during night-time work hours, for all three novel schedules than for either the traditional Q3 or Q4 schedules. Three proposed schedules that eliminate extended shifts may improve performance and alertness compared with traditional Q3 or Q4 schedules. Predicted times of worse performance and alertness were at night, which is also a time when supervision of trainees is lower. Mathematical modeling provides a quantitative comparison approach with potential to aid

  8. Relationship between non-technical skills and technical performance during cardiopulmonary resuscitation: does stress have an influence?

    PubMed

    Krage, Ralf; Zwaan, Laura; Tjon Soei Len, Lian; Kolenbrander, Mark W; van Groeningen, Dick; Loer, Stephan A; Wagner, Cordula; Schober, Patrick

    2017-11-01

    Non-technical skills, such as task management, leadership, situational awareness, communication and decision-making refer to cognitive, behavioural and social skills that contribute to safe and efficient team performance. The importance of these skills during cardiopulmonary resuscitation (CPR) is increasingly emphasised. Nonetheless, the relationship between non-technical skills and technical performance is poorly understood. We hypothesise that non-technical skills become increasingly important under stressful conditions when individuals are distracted from their tasks, and investigated the relationship between non-technical and technical skills under control conditions and when external stressors are present. In this simulator-based randomised cross-over study, 30 anaesthesiologists and anaesthesia residents from the VU University Medical Center, Amsterdam, the Netherlands, participated in two different CPR scenarios in random order. In one scenario, external stressors (radio noise and a distractive scripted family member) were added, while the other scenario without stressors served as control condition. Non-technical performance of the team leader and technical performance of the team were measured using the 'Anaesthetists' Non-technical Skill' score and a recently developed technical skills score. Analysis of variance and Pearson correlation coefficients were used for statistical analyses. Non-technical performance declined when external stressors were present (adjusted mean difference 3.9 points, 95% CI 2.4 to 5.5 points). A significant correlation between non-technical and technical performance scores was observed when external stressors were present (r=0.67, 95% CI 0.40 to 0.83, p<0.001), while no evidence for such a relationship was observed under control conditions (r=0.15, 95% CI -0.22 to 0.49, p=0.42). This was equally true for all individual domains of the non-technical performance score (task management, team working, situation awareness, decision

  9. Conflict-Aware Scheduling Algorithm

    NASA Technical Reports Server (NTRS)

    Wang, Yeou-Fang; Borden, Chester

    2006-01-01

    conflict-aware scheduling algorithm is being developed to help automate the allocation of NASA s Deep Space Network (DSN) antennas and equipment that are used to communicate with interplanetary scientific spacecraft. The current approach for scheduling DSN ground resources seeks to provide an equitable distribution of tracking services among the multiple scientific missions and is very labor intensive. Due to the large (and increasing) number of mission requests for DSN services, combined with technical and geometric constraints, the DSN is highly oversubscribed. To help automate the process, and reduce the DSN and spaceflight project labor effort required for initiating, maintaining, and negotiating schedules, a new scheduling algorithm is being developed. The scheduling algorithm generates a "conflict-aware" schedule, where all requests are scheduled based on a dynamic priority scheme. The conflict-aware scheduling algorithm allocates all requests for DSN tracking services while identifying and maintaining the conflicts to facilitate collaboration and negotiation between spaceflight missions. These contrast with traditional "conflict-free" scheduling algorithms that assign tracks that are not in conflict and mark the remainder as unscheduled. In the case where full schedule automation is desired (based on mission/event priorities, fairness, allocation rules, geometric constraints, and ground system capabilities/ constraints), a conflict-free schedule can easily be created from the conflict-aware schedule by removing lower priority items that are in conflict.

  10. A Unified Model of Performance: Validation of its Predictions across Different Sleep/Wake Schedules

    PubMed Central

    Ramakrishnan, Sridhar; Wesensten, Nancy J.; Balkin, Thomas J.; Reifman, Jaques

    2016-01-01

    Study Objectives: Historically, mathematical models of human neurobehavioral performance developed on data from one sleep study were limited to predicting performance in similar studies, restricting their practical utility. We recently developed a unified model of performance (UMP) to predict the effects of the continuum of sleep loss—from chronic sleep restriction (CSR) to total sleep deprivation (TSD) challenges—and validated it using data from two studies of one laboratory. Here, we significantly extended this effort by validating the UMP predictions across a wide range of sleep/wake schedules from different studies and laboratories. Methods: We developed the UMP on psychomotor vigilance task (PVT) lapse data from one study encompassing four different CSR conditions (7 d of 3, 5, 7, and 9 h of sleep/night), and predicted performance in five other studies (from four laboratories), including different combinations of TSD (40 to 88 h), CSR (2 to 6 h of sleep/night), control (8 to 10 h of sleep/night), and nap (nocturnal and diurnal) schedules. Results: The UMP accurately predicted PVT performance trends across 14 different sleep/wake conditions, yielding average prediction errors between 7% and 36%, with the predictions lying within 2 standard errors of the measured data 87% of the time. In addition, the UMP accurately predicted performance impairment (average error of 15%) for schedules (TSD and naps) not used in model development. Conclusions: The unified model of performance can be used as a tool to help design sleep/wake schedules to optimize the extent and duration of neurobehavioral performance and to accelerate recovery after sleep loss. Citation: Ramakrishnan S, Wesensten NJ, Balkin TJ, Reifman J. A unified model of performance: validation of its predictions across different sleep/wake schedules. SLEEP 2016;39(1):249–262. PMID:26518594

  11. 48 CFR 216.402-2 - Technical performance incentives.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Technical performance incentives. 216.402-2 Section 216.402-2 Federal Acquisition Regulations System DEFENSE ACQUISITION... Contracts 216.402-2 Technical performance incentives. See PGI 216.402-2 for guidance on establishing...

  12. The relationship of chronobiology to sleep schedules and performance demands

    NASA Technical Reports Server (NTRS)

    Monk, T. H.

    1990-01-01

    This review is concerned with how chronobiological results concerning the human circadian timekeeping system ( biological clock'), its response to changes in schedule, and its influence on performance ability can be used to improve shift worker wellbeing, safety and productivity.

  13. Scheduled physical activity is associated with better academic performance in Chilean school-age children.

    PubMed

    Burrows, Raquel; Correa-Burrows, Paulina; Orellana, Yasna; Almagiá, Atilio; Lizana, Pablo; Ivanovic, Daniza

    2014-11-01

    This study was carried out to examine the association between systematic physical activity and academic performance in school kids after controlling for potential sociodemographic and educational confounders. In a random sample of 1271 students from urban Santiago, attending 5th and 9th grade, who took the 2009 System for the Assessment of Educational Quality (SIMCE) tests, we measured physical activity habits, anthropometric characteristics, and socioeconomic status. Academic performance was measured by the standardized SIMCE tests. Logistic regressions assessed the relationship between the allocation of time to weekly scheduled exercise, potential confounding factors, and individual academic performance. About 80% of students reported less than 2 hours of weekly scheduled exercise, while 10.6% and 10.2% reported 2 to 4 hours/week and more than 4 hours/week, respectively. Devoting more than 4 hours/week to scheduled exercise significantly increased (P < .01) the odds of having SIMCE composite z-scores ≥ 50th percentile (OR: 2.3, 95% CI: 1.4 to 3.6) and ≥ 75th percentile (OR: 2.1, 95% CI: 1.3-3.3). Better academic performance was associated with a higher allocation of time to scheduled exercise in school-age children.

  14. Effects of sleep schedules on commercial motor vehicle driver performance

    DOT National Transportation Integrated Search

    2000-05-01

    The project entitled "Effects of Sleep Schedules on Commercial Motor Vehicle Driver Performance" was comprised of two studies; a field study and a laboratory study. In the field study, wrist actigraphy was used to determine amounts of sleep in long-v...

  15. A Correlation Between Quality Management Metrics and Technical Performance Measurement

    DTIC Science & Technology

    2007-03-01

    Engineering Working Group SME Subject Matter Expert SoS System of Systems SPI Schedule performance Index SSEI System of Systems Engineering and...and stated as such [Q, M , M &G]. The QMM equation is given by: 12 QMM=0.92RQM+0.67EPM+0.55RKM+1.86PM, where: RGM is the requirements management...schedule. Now if corrective action is not taken, the project/task will be completed behind schedule and over budget. m . As well as the derived

  16. A Unified Model of Performance: Validation of its Predictions across Different Sleep/Wake Schedules.

    PubMed

    Ramakrishnan, Sridhar; Wesensten, Nancy J; Balkin, Thomas J; Reifman, Jaques

    2016-01-01

    Historically, mathematical models of human neurobehavioral performance developed on data from one sleep study were limited to predicting performance in similar studies, restricting their practical utility. We recently developed a unified model of performance (UMP) to predict the effects of the continuum of sleep loss-from chronic sleep restriction (CSR) to total sleep deprivation (TSD) challenges-and validated it using data from two studies of one laboratory. Here, we significantly extended this effort by validating the UMP predictions across a wide range of sleep/wake schedules from different studies and laboratories. We developed the UMP on psychomotor vigilance task (PVT) lapse data from one study encompassing four different CSR conditions (7 d of 3, 5, 7, and 9 h of sleep/night), and predicted performance in five other studies (from four laboratories), including different combinations of TSD (40 to 88 h), CSR (2 to 6 h of sleep/night), control (8 to 10 h of sleep/night), and nap (nocturnal and diurnal) schedules. The UMP accurately predicted PVT performance trends across 14 different sleep/wake conditions, yielding average prediction errors between 7% and 36%, with the predictions lying within 2 standard errors of the measured data 87% of the time. In addition, the UMP accurately predicted performance impairment (average error of 15%) for schedules (TSD and naps) not used in model development. The unified model of performance can be used as a tool to help design sleep/wake schedules to optimize the extent and duration of neurobehavioral performance and to accelerate recovery after sleep loss. © 2016 Associated Professional Sleep Societies, LLC.

  17. A Comparison of Earned Value Management and Earned Schedule as Schedule Predictors on DoD ACAT I Programs

    DTIC Science & Technology

    2013-03-01

    33 Mario Vanhoucke and Stephan Vandevoorde – “Measuring the Accuracy of Earned Value/Earned Schedule Forecasting Predictors” (2007...technical problem to the present day ‘ super projects’” (Clark and Lorenzoni, 1997: 2). Cost engineering has “application regardless of industry...large construction projects, but also the acceptance of earned schedule principles on an international scale. Mario Vanhoucke and Stephan Vandevoorde

  18. Cure Schedule for Stycast 2651/Catalyst 9.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kropka, Jamie Michael; McCoy, John D.

    2017-11-01

    The Emerson & Cuming technical data sheet (TDS) for Stycast 2651/Catalyst 9 lists three alternate cure schedules for the material, each of which would result in a different state of reaction and different material properties. Here, a cure schedule that attains full reaction of the material is defined. The use of this cure schedule will eliminate variance in material properties due to changes in the cure state of the material, and the cure schedule will serve as the method to make material prior to characterizing properties. The following recommendation uses one of the schedules within the TDS and adds amore » “post cure” to obtain full reaction.« less

  19. Unifying practice schedules in the timescales of motor learning and performance.

    PubMed

    Verhoeven, F Martijn; Newell, Karl M

    2018-06-01

    In this article, we elaborate from a multiple time scales model of motor learning to examine the independent and integrated effects of massed and distributed practice schedules within- and between-sessions on the persistent (learning) and transient (warm-up, fatigue) processes of performance change. The timescales framework reveals the influence of practice distribution on four learning-related processes: the persistent processes of learning and forgetting, and the transient processes of warm-up decrement and fatigue. The superposition of the different processes of practice leads to a unified set of effects for massed and distributed practice within- and between-sessions in learning motor tasks. This analysis of the interaction between the duration of the interval of practice trials or sessions and parameters of the introduced time scale model captures the unified influence of the between trial and session scheduling of practice on learning and performance. It provides a starting point for new theoretically based hypotheses, and the scheduling of practice that minimizes the negative effects of warm-up decrement, fatigue and forgetting while exploiting the positive effects of learning and retention. Copyright © 2018 Elsevier B.V. All rights reserved.

  20. Performance of Extended Local Clustering Organization (LCO) for Large Scale Job-Shop Scheduling Problem (JSP)

    NASA Astrophysics Data System (ADS)

    Konno, Yohko; Suzuki, Keiji

    This paper describes an approach to development of a solution algorithm of a general-purpose for large scale problems using “Local Clustering Organization (LCO)” as a new solution for Job-shop scheduling problem (JSP). Using a performance effective large scale scheduling in the study of usual LCO, a solving JSP keep stability induced better solution is examined. In this study for an improvement of a performance of a solution for JSP, processes to a optimization by LCO is examined, and a scheduling solution-structure is extended to a new solution-structure based on machine-division. A solving method introduced into effective local clustering for the solution-structure is proposed as an extended LCO. An extended LCO has an algorithm which improves scheduling evaluation efficiently by clustering of parallel search which extends over plural machines. A result verified by an application of extended LCO on various scale of problems proved to conduce to minimizing make-span and improving on the stable performance.

  1. NASA Instrument Cost/Schedule Model

    NASA Technical Reports Server (NTRS)

    Habib-Agahi, Hamid; Mrozinski, Joe; Fox, George

    2011-01-01

    NASA's Office of Independent Program and Cost Evaluation (IPCE) has established a number of initiatives to improve its cost and schedule estimating capabilities. 12One of these initiatives has resulted in the JPL developed NASA Instrument Cost Model. NICM is a cost and schedule estimator that contains: A system level cost estimation tool; a subsystem level cost estimation tool; a database of cost and technical parameters of over 140 previously flown remote sensing and in-situ instruments; a schedule estimator; a set of rules to estimate cost and schedule by life cycle phases (B/C/D); and a novel tool for developing joint probability distributions for cost and schedule risk (Joint Confidence Level (JCL)). This paper describes the development and use of NICM, including the data normalization processes, data mining methods (cluster analysis, principal components analysis, regression analysis and bootstrap cross validation), the estimating equations themselves and a demonstration of the NICM tool suite.

  2. Individualized deliberate practice on a virtual reality simulator improves technical performance of surgical novices in the operating room: a randomized controlled trial.

    PubMed

    Palter, Vanessa N; Grantcharov, Teodor P

    2014-03-01

    The purpose of this study was to investigate whether individualized deliberate practice on a virtual reality (VR) simulator results in improved technical performance in the operating room. Training on VR simulators has been shown to improve technical performance in the operating room (OR). Currently described VR curricula consist of trainees practicing the same tasks until expert proficiency is reached. It has yet to be investigated whether the individualized deliberate practice, where curricula tasks vary depending on prior levels of technical proficiency, would translate into the OR. This single-blinded prospective trial randomized 16 novice surgical residents to a deliberate practice (DP) group and a conventional residency training group. Both groups performed a laparoscopic cholecystectomy in the OR that was video-recorded. Technical performance of DP group residents in the OR was assessed using 3 validated assessment tools. A score of less than 60% on any component of the assessment tool resulted in the trainee practicing a specific task on the VR simulator. The DP group practiced on the simulator as per their individualized schedule. Both groups then performed another laparoscopic cholecystectomy. A blinded expert assessed the OR recordings using a validated global rating scale. Although both groups had similar technical abilities preintervention [DP: median score, 13.5 (9.3-15.0); control: median score, 14.5 (9.3-17.8); P = 0.45], the DP residents had a superior technical performance postintervention [DP: median score, 17.0 (15.3-18.5); control: median score, 12.5 (7.5-14.0); P = 0.03]. Of 8 DP residents, 6 practiced 5 basic VR tasks (median 1 trial to pass), and 7 of 8 practiced 2 advanced tasks (median 4 trials to pass). A curriculum of deliberate individualized practice on a VR simulator improves technical performance in the OR. This has implications to greatly improve the feasibility of implementing simulation-based curricula in residency training

  3. Technical performance and match-to-match variation in elite football teams.

    PubMed

    Liu, Hongyou; Gómez, Miguel-Angel; Gonçalves, Bruno; Sampaio, Jaime

    2016-01-01

    Recent research suggests that match-to-match variation adds important information to performance descriptors in team sports, as it helps measure how players fine-tune their tactical behaviours and technical actions to the extreme dynamical environments. The current study aims to identify the differences in technical performance of players from strong and weak teams and to explore match-to-match variation of players' technical match performance. Performance data of all the 380 matches of season 2012-2013 in the Spanish First Division Professional Football League were analysed. Twenty-one performance-related match actions and events were chosen as variables in the analyses. Players' technical performance profiles were established by unifying count values of each action or event of each player per match into the same scale. Means of these count values of players from Top3 and Bottom3 teams were compared and plotted into radar charts. Coefficient of variation of each match action or event within a player was calculated to represent his match-to-match variation of technical performance. Differences in the variation of technical performances of players across different match contexts (team and opposition strength, match outcome and match location) were compared. All the comparisons were achieved by the magnitude-based inferences. Results showed that technical performances differed between players of strong and weak teams from different perspectives across different field positions. Furthermore, the variation of the players' technical performance is affected by the match context, with effects from team and opposition strength greater than effects from match location and match outcome.

  4. 48 CFR 1816.402-270 - NASA technical performance incentives.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false NASA technical performance incentives. 1816.402-270 Section 1816.402-270 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND....402-270 NASA technical performance incentives. (a) Pursuant to the guidelines in 1816.402, NASA has...

  5. 48 CFR 1816.402-270 - NASA technical performance incentives.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true NASA technical performance incentives. 1816.402-270 Section 1816.402-270 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND....402-270 NASA technical performance incentives. (a) Pursuant to the guidelines in 1816.402, NASA has...

  6. 48 CFR 1816.402-270 - NASA technical performance incentives.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false NASA technical performance incentives. 1816.402-270 Section 1816.402-270 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND....402-270 NASA technical performance incentives. (a) Pursuant to the guidelines in 1816.402, NASA has...

  7. 48 CFR 1816.402-270 - NASA technical performance incentives.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false NASA technical performance incentives. 1816.402-270 Section 1816.402-270 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND....402-270 NASA technical performance incentives. (a) Pursuant to the guidelines in 1816.402, NASA has...

  8. 48 CFR 1816.402-270 - NASA technical performance incentives.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA technical performance incentives. 1816.402-270 Section 1816.402-270 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND....402-270 NASA technical performance incentives. (a) Pursuant to the guidelines in 1816.402, NASA has...

  9. A Hybrid Task Graph Scheduler for High Performance Image Processing Workflows.

    PubMed

    Blattner, Timothy; Keyrouz, Walid; Bhattacharyya, Shuvra S; Halem, Milton; Brady, Mary

    2017-12-01

    Designing applications for scalability is key to improving their performance in hybrid and cluster computing. Scheduling code to utilize parallelism is difficult, particularly when dealing with data dependencies, memory management, data motion, and processor occupancy. The Hybrid Task Graph Scheduler (HTGS) improves programmer productivity when implementing hybrid workflows for multi-core and multi-GPU systems. The Hybrid Task Graph Scheduler (HTGS) is an abstract execution model, framework, and API that increases programmer productivity when implementing hybrid workflows for such systems. HTGS manages dependencies between tasks, represents CPU and GPU memories independently, overlaps computations with disk I/O and memory transfers, keeps multiple GPUs occupied, and uses all available compute resources. Through these abstractions, data motion and memory are explicit; this makes data locality decisions more accessible. To demonstrate the HTGS application program interface (API), we present implementations of two example algorithms: (1) a matrix multiplication that shows how easily task graphs can be used; and (2) a hybrid implementation of microscopy image stitching that reduces code size by ≈ 43% compared to a manually coded hybrid workflow implementation and showcases the minimal overhead of task graphs in HTGS. Both of the HTGS-based implementations show good performance. In image stitching the HTGS implementation achieves similar performance to the hybrid workflow implementation. Matrix multiplication with HTGS achieves 1.3× and 1.8× speedup over the multi-threaded OpenBLAS library for 16k × 16k and 32k × 32k size matrices, respectively.

  10. Human Schedule Performance, Protocol Analysis, and the "Silent Dog" Methodology

    ERIC Educational Resources Information Center

    Cabello, Francisco; Luciano, Carmen; Gomez, Inmaculada; Barnes-Holmes, Dermot

    2004-01-01

    The purpose of the current experiment was to investigate the role of private verbal behavior on the operant performances of human adults, using a protocol analysis procedure with additional methodological controls (the "silent dog" method). Twelve subjects were exposed to fixed ratio 8 and differential reinforcement of low rate 3-s schedules. For…

  11. Vocational and Technical Education Performance Standards and Competencies.

    ERIC Educational Resources Information Center

    Connecticut State Board of Education, Hartford.

    These Connecticut vocational and technical performance standards and competencies are a guide for overall quality attainment in these seven vocational and technical program areas: agricultural science technology education; business and finance technology education; cooperative work education; family and consumer sciences education; marketing…

  12. 16 CFR 1401.5 - Providing performance and technical data to purchasers by labeling.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 16 Commercial Practices 2 2014-01-01 2014-01-01 false Providing performance and technical data to...: REQUIREMENTS TO PROVIDE THE COMMISSION WITH PERFORMANCE AND TECHNICAL DATA; REQUIREMENTS TO NOTIFY CONSUMERS AT POINT OF PURCHASE OF PERFORMANCE AND TECHNICAL DATA § 1401.5 Providing performance and technical data to...

  13. 16 CFR 1401.5 - Providing performance and technical data to purchasers by labeling.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 16 Commercial Practices 2 2012-01-01 2012-01-01 false Providing performance and technical data to...: REQUIREMENTS TO PROVIDE THE COMMISSION WITH PERFORMANCE AND TECHNICAL DATA; REQUIREMENTS TO NOTIFY CONSUMERS AT POINT OF PURCHASE OF PERFORMANCE AND TECHNICAL DATA § 1401.5 Providing performance and technical data to...

  14. 16 CFR 1401.5 - Providing performance and technical data to purchasers by labeling.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 16 Commercial Practices 2 2011-01-01 2011-01-01 false Providing performance and technical data to...: REQUIREMENTS TO PROVIDE THE COMMISSION WITH PERFORMANCE AND TECHNICAL DATA; REQUIREMENTS TO NOTIFY CONSUMERS AT POINT OF PURCHASE OF PERFORMANCE AND TECHNICAL DATA § 1401.5 Providing performance and technical data to...

  15. 16 CFR 1401.5 - Providing performance and technical data to purchasers by labeling.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Providing performance and technical data to...: REQUIREMENTS TO PROVIDE THE COMMISSION WITH PERFORMANCE AND TECHNICAL DATA; REQUIREMENTS TO NOTIFY CONSUMERS AT POINT OF PURCHASE OF PERFORMANCE AND TECHNICAL DATA § 1401.5 Providing performance and technical data to...

  16. 25 CFR 547.12 - What are the minimum technical standards for downloading on a Class II gaming system?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... OF CLASS II GAMES § 547.12 What are the minimum technical standards for downloading on a Class II... software, files, data, and prize schedules. (2) Downloads of software, games, prize schedules, or other... performed in a manner that will not affect game play. (5) Downloads shall not affect the integrity of...

  17. 25 CFR 547.12 - What are the minimum technical standards for downloading on a Class II gaming system?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... OF CLASS II GAMES § 547.12 What are the minimum technical standards for downloading on a Class II... software, files, data, and prize schedules. (2) Downloads of software, games, prize schedules, or other... performed in a manner that will not affect game play. (5) Downloads shall not affect the integrity of...

  18. 25 CFR 547.12 - What are the minimum technical standards for downloading on a Class II gaming system?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... OF CLASS II GAMES § 547.12 What are the minimum technical standards for downloading on a Class II... software, files, data, and prize schedules. (2) Downloads of software, games, prize schedules, or other... performed in a manner that will not affect game play. (5) Downloads shall not affect the integrity of...

  19. Completable scheduling: An integrated approach to planning and scheduling

    NASA Technical Reports Server (NTRS)

    Gervasio, Melinda T.; Dejong, Gerald F.

    1992-01-01

    The planning problem has traditionally been treated separately from the scheduling problem. However, as more realistic domains are tackled, it becomes evident that the problem of deciding on an ordered set of tasks to achieve a set of goals cannot be treated independently of the problem of actually allocating resources to the tasks. Doing so would result in losing the robustness and flexibility needed to deal with imperfectly modeled domains. Completable scheduling is an approach which integrates the two problems by allowing an a priori planning module to defer particular planning decisions, and consequently the associated scheduling decisions, until execution time. This allows a completable scheduling system to maximize plan flexibility by allowing runtime information to be taken into consideration when making planning and scheduling decision. Furthermore, through the criteria of achievability placed on deferred decision, a completable scheduling system is able to retain much of the goal-directedness and guarantees of achievement afforded by a priori planning. The completable scheduling approach is further enhanced by the use of contingent explanation-based learning, which enables a completable scheduling system to learn general completable plans from example and improve its performance through experience. Initial experimental results show that completable scheduling outperforms classical scheduling as well as pure reactive scheduling in a simple scheduling domain.

  20. Performance comparison of heuristic algorithms for task scheduling in IaaS cloud computing environment.

    PubMed

    Madni, Syed Hamid Hussain; Abd Latiff, Muhammad Shafie; Abdullahi, Mohammed; Abdulhamid, Shafi'i Muhammad; Usman, Mohammed Joda

    2017-01-01

    Cloud computing infrastructure is suitable for meeting computational needs of large task sizes. Optimal scheduling of tasks in cloud computing environment has been proved to be an NP-complete problem, hence the need for the application of heuristic methods. Several heuristic algorithms have been developed and used in addressing this problem, but choosing the appropriate algorithm for solving task assignment problem of a particular nature is difficult since the methods are developed under different assumptions. Therefore, six rule based heuristic algorithms are implemented and used to schedule autonomous tasks in homogeneous and heterogeneous environments with the aim of comparing their performance in terms of cost, degree of imbalance, makespan and throughput. First Come First Serve (FCFS), Minimum Completion Time (MCT), Minimum Execution Time (MET), Max-min, Min-min and Sufferage are the heuristic algorithms considered for the performance comparison and analysis of task scheduling in cloud computing.

  1. Performance comparison of heuristic algorithms for task scheduling in IaaS cloud computing environment

    PubMed Central

    Madni, Syed Hamid Hussain; Abd Latiff, Muhammad Shafie; Abdullahi, Mohammed; Usman, Mohammed Joda

    2017-01-01

    Cloud computing infrastructure is suitable for meeting computational needs of large task sizes. Optimal scheduling of tasks in cloud computing environment has been proved to be an NP-complete problem, hence the need for the application of heuristic methods. Several heuristic algorithms have been developed and used in addressing this problem, but choosing the appropriate algorithm for solving task assignment problem of a particular nature is difficult since the methods are developed under different assumptions. Therefore, six rule based heuristic algorithms are implemented and used to schedule autonomous tasks in homogeneous and heterogeneous environments with the aim of comparing their performance in terms of cost, degree of imbalance, makespan and throughput. First Come First Serve (FCFS), Minimum Completion Time (MCT), Minimum Execution Time (MET), Max-min, Min-min and Sufferage are the heuristic algorithms considered for the performance comparison and analysis of task scheduling in cloud computing. PMID:28467505

  2. Space station program phase B definition: Nuclear reactor-powered space station cost and schedules

    NASA Technical Reports Server (NTRS)

    1971-01-01

    Tabulated data are presented on the costs, schedules, and technical characteristics for the space station phases C and D program. The work breakdown structure, schedule data, program ground rules, program costs, cost-estimating rationale, funding schedules, and supporting data are included.

  3. 16 CFR 1407.3 - Providing performance and technical data to purchasers by labeling.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 16 Commercial Practices 2 2014-01-01 2014-01-01 false Providing performance and technical data to... TECHNICAL DATA BY LABELING § 1407.3 Providing performance and technical data to purchasers by labeling. (a... technical data related to performance and safety to prospective purchasers of such products at the time of...

  4. 16 CFR 1407.3 - Providing performance and technical data to purchasers by labeling.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Providing performance and technical data to... TECHNICAL DATA BY LABELING § 1407.3 Providing performance and technical data to purchasers by labeling. (a... technical data related to performance and safety to prospective purchasers of such products at the time of...

  5. 16 CFR 1407.3 - Providing performance and technical data to purchasers by labeling.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 16 Commercial Practices 2 2012-01-01 2012-01-01 false Providing performance and technical data to... TECHNICAL DATA BY LABELING § 1407.3 Providing performance and technical data to purchasers by labeling. (a... technical data related to performance and safety to prospective purchasers of such products at the time of...

  6. 16 CFR 1407.3 - Providing performance and technical data to purchasers by labeling.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 16 Commercial Practices 2 2011-01-01 2011-01-01 false Providing performance and technical data to... TECHNICAL DATA BY LABELING § 1407.3 Providing performance and technical data to purchasers by labeling. (a... technical data related to performance and safety to prospective purchasers of such products at the time of...

  7. Setting Performance Standards for Technical and Nontechnical Competence in General Surgery.

    PubMed

    Szasz, Peter; Bonrath, Esther M; Louridas, Marisa; Fecso, Andras B; Howe, Brett; Fehr, Adam; Ott, Michael; Mack, Lloyd A; Harris, Kenneth A; Grantcharov, Teodor P

    2017-07-01

    The objectives of this study were to (1) create a technical and nontechnical performance standard for the laparoscopic cholecystectomy, (2) assess the classification accuracy and (3) credibility of these standards, (4) determine a trainees' ability to meet both standards concurrently, and (5) delineate factors that predict standard acquisition. Scores on performance assessments are difficult to interpret in the absence of established standards. Trained raters observed General Surgery residents performing laparoscopic cholecystectomies using the Objective Structured Assessment of Technical Skill (OSATS) and the Objective Structured Assessment of Non-Technical Skills (OSANTS) instruments, while as also providing a global competent/noncompetent decision for each performance. The global decision was used to divide the trainees into 2 contrasting groups and the OSATS or OSANTS scores were graphed per group to determine the performance standard. Parametric statistics were used to determine classification accuracy and concurrent standard acquisition, receiver operator characteristic (ROC) curves were used to delineate predictive factors. Thirty-six trainees were observed 101 times. The technical standard was an OSATS of 21.04/35.00 and the nontechnical standard an OSANTS of 22.49/35.00. Applying these standards, competent/noncompetent trainees could be discriminated in 94% of technical and 95% of nontechnical performances (P < 0.001). A 21% discordance between technically and nontechnically competent trainees was identified (P < 0.001). ROC analysis demonstrated case experience and trainee level were both able to predict achieving the standards with an area under the curve (AUC) between 0.83 and 0.96 (P < 0.001). The present study presents defensible standards for technical and nontechnical performance. Such standards are imperative to implementing summative assessments into surgical training.

  8. Performance Analysis of Stop-Skipping Scheduling Plans in Rail Transit under Time-Dependent Demand

    PubMed Central

    Cao, Zhichao; Yuan, Zhenzhou; Zhang, Silin

    2016-01-01

    Stop-skipping is a key method for alleviating congestion in rail transit, where schedules are sometimes difficult to implement. Several mechanisms have been proposed and analyzed in the literature, but very few performance comparisons are available. This study formulated train choice behavior estimation into the model considering passengers’ perception. If a passenger’s train path can be identified, this information would be useful for improving the stop-skipping schedule service. Multi-performance is a key characteristic of our proposed five stop-skipping schedules, but quantified analysis can be used to illustrate the different effects of well-known deterministic and stochastic forms. Problems in the novel category of forms were justified in the context of a single line rather than transit network. We analyzed four deterministic forms based on the well-known A/B stop-skipping operating strategy. A stochastic form was innovatively modeled as a binary integer programming problem. We present a performance analysis of our proposed model to demonstrate that stop-skipping can feasibly be used to improve the service of passengers and enhance the elasticity of train operations under demand variations along with an explicit parametric discussion. PMID:27420087

  9. Performance Analysis of Stop-Skipping Scheduling Plans in Rail Transit under Time-Dependent Demand.

    PubMed

    Cao, Zhichao; Yuan, Zhenzhou; Zhang, Silin

    2016-07-13

    Stop-skipping is a key method for alleviating congestion in rail transit, where schedules are sometimes difficult to implement. Several mechanisms have been proposed and analyzed in the literature, but very few performance comparisons are available. This study formulated train choice behavior estimation into the model considering passengers' perception. If a passenger's train path can be identified, this information would be useful for improving the stop-skipping schedule service. Multi-performance is a key characteristic of our proposed five stop-skipping schedules, but quantified analysis can be used to illustrate the different effects of well-known deterministic and stochastic forms. Problems in the novel category of forms were justified in the context of a single line rather than transit network. We analyzed four deterministic forms based on the well-known A/B stop-skipping operating strategy. A stochastic form was innovatively modeled as a binary integer programming problem. We present a performance analysis of our proposed model to demonstrate that stop-skipping can feasibly be used to improve the service of passengers and enhance the elasticity of train operations under demand variations along with an explicit parametric discussion.

  10. 16 CFR 1406.5 - Performance and technical data to be furnished to the Commission.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Commission the following performance and technical data related to performance and safety. (a) Written notice... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Performance and technical data to be... TECHNICAL DATA § 1406.5 Performance and technical data to be furnished to the Commission. Manufacturers...

  11. Submarine watch schedules: underway evaluation of rotating (contemporary) and compressed (alternative) schedules.

    PubMed

    Duplessis, C A; Miller, J C; Crepeau, L J; Osborn, C M; Dyche, J

    2007-01-01

    With a desire to increase health, cognitive performance effectiveness, and quality of life for submarine watch-standers underway, we performed an evaluation comparing an alternative, compressed-work (ALT) schedule, designed to enhance circadian rhythm entrainment and sleep hygiene, to the contemporary submarine (SUB) forward rotating schedule, aboard the ballistic-missile submarine, USS Henry M. Jackson (SSBN-730 Gold). We assessed a compressed close-6 watch-schedule ("ALT") relative to the existing backward rotating 6-hr on, 12-hr off 18-hr watch schedule ("SUB") employed underway aboard submarines. We monitored 40 subjects' sleep, and temperature and salivary cortisol from 10 of the 40 for approximately two weeks on each respective schedule underway. The cortisol cosinor mesors (midline estimating statistic of rhythm), and amplitudes did not differ significantly between conditions. The temperature cosinor mesors, and the cosinor amplitude were not significantly different, while the cosine curve fit accounted for significantly more variance in the ALT condition than in the SUB condition. The SUB schedule garnered significantly more sleep (7.1 +/- 0.2 hours) than that of the ALTMID schedule (6.3 +/- 0.3 hours). Surveys revealed that 52% of respondents preferred the SUB schedule, 15% preferred the ALT, and 33% were either indifferent or submitted uninterpretable surveys. The ALT schedule was not superior to the existing SUB schedule by physiological or subjective measures and was incompatible to accommodating operational constraints.

  12. 16 CFR § 1401.5 - Providing performance and technical data to purchasers by labeling.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 16 Commercial Practices 2 2013-01-01 2013-01-01 false Providing performance and technical data to...: REQUIREMENTS TO PROVIDE THE COMMISSION WITH PERFORMANCE AND TECHNICAL DATA; REQUIREMENTS TO NOTIFY CONSUMERS AT POINT OF PURCHASE OF PERFORMANCE AND TECHNICAL DATA § 1401.5 Providing performance and technical data to...

  13. The Basic Organizing/Optimizing Training Scheduler (BOOTS): User's Guide. Technical Report 151.

    ERIC Educational Resources Information Center

    Church, Richard L.; Keeler, F. Laurence

    This report provides the step-by-step instructions required for using the Navy's Basic Organizing/Optimizing Training Scheduler (BOOTS) system. BOOTS is a computerized tool designed to aid in the creation of master training schedules for each Navy recruit training command. The system is defined in terms of three major functions: (1) data file…

  14. 77 FR 56743 - Federal Acquisition Regulation; Technical Amendments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-13

    ... Regulation; Technical Amendments AGENCY: Department of Defense (DoD), General Services Administration (GSA... publication schedules. Please cite FAC 2005-61, Technical Amendments. SUPPLEMENTARY INFORMATION: In order to...

  15. 78 FR 6191 - Federal Acquisition Regulation; Technical Amendments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-29

    ... Regulation; Technical Amendments AGENCY: Department of Defense (DoD), General Services Administration (GSA... publication schedules. Please cite FAC 2005-65, Technical Amendments. SUPPLEMENTARY INFORMATION: In order to...

  16. A Generic Expert Scheduling System Architecture and Toolkit: GUESS (Generically Used Expert Scheduling System)

    NASA Technical Reports Server (NTRS)

    Liebowitz, Jay; Krishnamurthy, Vijaya; Rodens, Ira; Houston, Chapman; Liebowitz, Alisa; Baek, Seung; Radko, Joe; Zeide, Janet

    1996-01-01

    Scheduling has become an increasingly important element in today's society and workplace. Within the NASA environment, scheduling is one of the most frequently performed and challenging functions. Towards meeting NASA's scheduling needs, a research version of a generic expert scheduling system architecture and toolkit has been developed. This final report describes the development and testing of GUESS (Generically Used Expert Scheduling System).

  17. The influence of "preparedness" on autoshaping, schedule performance, and choice.

    PubMed

    Burns, J D; Malone, J C

    1992-11-01

    Two groups of experimentally naive pigeons were exposed to an autoshaping procedure in which the response key was mounted on the wall (the conventional location) or on the floor of the chamber. In two experiments, subjects readily responded to the wall key, but floor-key subjects required shaping. A subsequent experiment compared performance of wall- and floor-key groups on an ascending series of fixed-ratio schedule values, resistance to extinction, differential reinforcement of other behavior, and reversal of key assignment. Each experiment was followed by several sessions of fixed-ratio training; the performance of the wall- and floor-key groups was almost identical throughout. In the final experiment, a fixed-ratio requirement could be completed on either or both keys. Birds initially chose the key on which they had responded during the preceding (reversal of key assignment) experiment. However, within a few sessions both groups showed almost exclusive preference for the floor key. Preference for a key located on the floor may follow from the fact that pigeons are ground feeders and may thus be more "prepared" to peck the floor than to peck a wall. However, autoshaping, under the conditions prevailing here, occurred much more readily to the wall key, suggesting that pecking a vertical surface is more highly prepared. Difficulties in determining relative preparedness seem moot, however, given the lack of between-group differences in the intervening experiments. It is thus unlikely that schedule performances critically depend upon the specific operant response involved.

  18. Influence of sleep and meal schedules on performance peaks in competitive sprinters.

    PubMed

    Javierre, C; Calvo, M; Díez, A; Garrido, E; Segura, R; Ventura, J L

    1996-08-01

    The influence of sleep and meal schedules on performance in short distance running was assessed in a group of 8 national-class competition male sprinters. They were tested on Saturdays for five consecutive weeks. On each testing day, the performance time for an 80 m sprint was registered on eight different occasions during days 1 and 4, on 9 occasions on days 2 and 5, and on 7 occasions on day 3. On control days (days 1 and 4) performance gradually improved during the morning up to 13:00 h, decreased at 15:00 h, and again improved thereafter, with a maximum peak performance at 19:00 h. On day 2, in which sleep/wake cycles and meal-times were advanced for two hours, and on day 3, in which timetables were delayed for two hours, maximum peak performance was observed at 17:00 h and 21:00 h, respectively. At the time of maximum peak performance on both days a statistically significant improvement was observed as compared with the control day (day 2, p < 0.01; day 3, p = 0.001). On day 5, in which only the sleep/wake cycle was advanced for two hours, performance in the afternoon and evening was similar to that recorded on days 1 and 4. We observed that easy manipulation of sleep and meal schedules would allow competitive sprinters to synchronize peak power output with the time of the athletic event, increasing the chances for improvement in performance.

  19. Performance of Quantum Annealers on Hard Scheduling Problems

    NASA Astrophysics Data System (ADS)

    Pokharel, Bibek; Venturelli, Davide; Rieffel, Eleanor

    Quantum annealers have been employed to attack a variety of optimization problems. We compared the performance of the current D-Wave 2X quantum annealer to that of the previous generation D-Wave Two quantum annealer on scheduling-type planning problems. Further, we compared the effect of different anneal times, embeddings of the logical problem, and different settings of the ferromagnetic coupling JF across the logical vertex-model on the performance of the D-Wave 2X quantum annealer. Our results show that at the best settings, the scaling of expected anneal time to solution for D-WAVE 2X is better than that of the DWave Two, but still inferior to that of state of the art classical solvers on these problems. We discuss the implication of our results for the design and programming of future quantum annealers. Supported by NASA Ames Research Center.

  20. Scheduler Design Criteria: Requirements and Considerations

    NASA Technical Reports Server (NTRS)

    Lee, Hanbong

    2016-01-01

    This presentation covers fundamental requirements and considerations for developing schedulers in airport operations. We first introduce performance and functional requirements for airport surface schedulers. Among various optimization problems in airport operations, we focus on airport surface scheduling problem, including runway and taxiway operations. We then describe a basic methodology for airport surface scheduling such as node-link network model and scheduling algorithms previously developed. Next, we explain how to design a mathematical formulation in more details, which consists of objectives, decision variables, and constraints. Lastly, we review other considerations, including optimization tools, computational performance, and performance metrics for evaluation.

  1. 16 CFR § 1407.3 - Providing performance and technical data to purchasers by labeling.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 16 Commercial Practices 2 2013-01-01 2013-01-01 false Providing performance and technical data to... TECHNICAL DATA BY LABELING § 1407.3 Providing performance and technical data to purchasers by labeling. (a... technical data related to performance and safety to prospective purchasers of such products at the time of...

  2. Intelligent Scheduling for Underground Mobile Mining Equipment

    PubMed Central

    Song, Zhen; Schunnesson, Håkan; Rinne, Mikael; Sturgul, John

    2015-01-01

    Many studies have been carried out and many commercial software applications have been developed to improve the performances of surface mining operations, especially for the loader-trucks cycle of surface mining. However, there have been quite few studies aiming to improve the mining process of underground mines. In underground mines, mobile mining equipment is mostly scheduled instinctively, without theoretical support for these decisions. Furthermore, in case of unexpected events, it is hard for miners to rapidly find solutions to reschedule and to adapt the changes. This investigation first introduces the motivation, the technical background, and then the objective of the study. A decision support instrument (i.e. schedule optimizer for mobile mining equipment) is proposed and described to address this issue. The method and related algorithms which are used in this instrument are presented and discussed. The proposed method was tested by using a real case of Kittilä mine located in Finland. The result suggests that the proposed method can considerably improve the working efficiency and reduce the working time of the underground mine. PMID:26098934

  3. Intelligent Scheduling for Underground Mobile Mining Equipment.

    PubMed

    Song, Zhen; Schunnesson, Håkan; Rinne, Mikael; Sturgul, John

    2015-01-01

    Many studies have been carried out and many commercial software applications have been developed to improve the performances of surface mining operations, especially for the loader-trucks cycle of surface mining. However, there have been quite few studies aiming to improve the mining process of underground mines. In underground mines, mobile mining equipment is mostly scheduled instinctively, without theoretical support for these decisions. Furthermore, in case of unexpected events, it is hard for miners to rapidly find solutions to reschedule and to adapt the changes. This investigation first introduces the motivation, the technical background, and then the objective of the study. A decision support instrument (i.e. schedule optimizer for mobile mining equipment) is proposed and described to address this issue. The method and related algorithms which are used in this instrument are presented and discussed. The proposed method was tested by using a real case of Kittilä mine located in Finland. The result suggests that the proposed method can considerably improve the working efficiency and reduce the working time of the underground mine.

  4. Production Scheduling for Rehabilitation Workshops.

    ERIC Educational Resources Information Center

    Hietala, David A.

    This publication examines production scheduling procedures for sheltered workshops. The manual includes three major sections: (1) the importance and benefits of production scheduling; (2) how-to information on performing basic scheduling in the workshop; and (3) answers to the question, What makes production scheduling work? The scheduling…

  5. NASA scheduling technologies

    NASA Technical Reports Server (NTRS)

    Adair, Jerry R.

    1994-01-01

    This paper is a consolidated report on ten major planning and scheduling systems that have been developed by the National Aeronautics and Space Administration (NASA). A description of each system, its components, and how it could be potentially used in private industry is provided in this paper. The planning and scheduling technology represented by the systems ranges from activity based scheduling employing artificial intelligence (AI) techniques to constraint based, iterative repair scheduling. The space related application domains in which the systems have been deployed vary from Space Shuttle monitoring during launch countdown to long term Hubble Space Telescope (HST) scheduling. This paper also describes any correlation that may exist between the work done on different planning and scheduling systems. Finally, this paper documents the lessons learned from the work and research performed in planning and scheduling technology and describes the areas where future work will be conducted.

  6. Synthesis of power plant outage schedules. Final technical report, April 1995-January 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, D.R.

    This document provides a report on the creation of domain theories in the power plant outage domain. These were developed in conjunction with the creation of a demonstration system of advanced scheduling technology for the outage problem. In 1994 personnel from Rome Laboratory (RL), Kaman Science (KS), Kestrel Institute, and the Electric Power Research Institute (EPRI) began a joint project to develop scheduling tools for power plant outage activities. This report describes our support for this joint effort. The project uses KIDS (Kestrel Interactive Development System) to generate schedulers from formal specifications of the power plant domain outage activities.

  7. Schedule-Aware Workflow Management Systems

    NASA Astrophysics Data System (ADS)

    Mans, Ronny S.; Russell, Nick C.; van der Aalst, Wil M. P.; Moleman, Arnold J.; Bakker, Piet J. M.

    Contemporary workflow management systems offer work-items to users through specific work-lists. Users select the work-items they will perform without having a specific schedule in mind. However, in many environments work needs to be scheduled and performed at particular times. For example, in hospitals many work-items are linked to appointments, e.g., a doctor cannot perform surgery without reserving an operating theater and making sure that the patient is present. One of the problems when applying workflow technology in such domains is the lack of calendar-based scheduling support. In this paper, we present an approach that supports the seamless integration of unscheduled (flow) and scheduled (schedule) tasks. Using CPN Tools we have developed a specification and simulation model for schedule-aware workflow management systems. Based on this a system has been realized that uses YAWL, Microsoft Exchange Server 2007, Outlook, and a dedicated scheduling service. The approach is illustrated using a real-life case study at the AMC hospital in the Netherlands. In addition, we elaborate on the experiences obtained when developing and implementing a system of this scale using formal techniques.

  8. Performance evaluation of different types of particle representation procedures of Particle Swarm Optimization in Job-shop Scheduling Problems

    NASA Astrophysics Data System (ADS)

    Izah Anuar, Nurul; Saptari, Adi

    2016-02-01

    This paper addresses the types of particle representation (encoding) procedures in a population-based stochastic optimization technique in solving scheduling problems known in the job-shop manufacturing environment. It intends to evaluate and compare the performance of different particle representation procedures in Particle Swarm Optimization (PSO) in the case of solving Job-shop Scheduling Problems (JSP). Particle representation procedures refer to the mapping between the particle position in PSO and the scheduling solution in JSP. It is an important step to be carried out so that each particle in PSO can represent a schedule in JSP. Three procedures such as Operation and Particle Position Sequence (OPPS), random keys representation and random-key encoding scheme are used in this study. These procedures have been tested on FT06 and FT10 benchmark problems available in the OR-Library, where the objective function is to minimize the makespan by the use of MATLAB software. Based on the experimental results, it is discovered that OPPS gives the best performance in solving both benchmark problems. The contribution of this paper is the fact that it demonstrates to the practitioners involved in complex scheduling problems that different particle representation procedures can have significant effects on the performance of PSO in solving JSP.

  9. The Effectiveness of Concurrent Design on the Cost and Schedule Performance of Defense Weapons System Acquisitions

    NASA Astrophysics Data System (ADS)

    Robertson, Randolph B.

    This study investigates the impact of concurrent design on the cost growth and schedule growth of US Department of Defense Major Defense Acquisition Systems (MDAPs). It is motivated by the question of whether employment of concurrent design in the development of a major weapon system will produce better results in terms of cost and schedule than traditional serial development methods. Selected Acquisition Reports were used to determine the cost and schedule growth of MDAPs as well as the degree of concurrency employed. Two simple linear regression analyses were used to determine the degree to which cost growth and schedule growth vary with concurrency. The results were somewhat surprising in that for major weapon systems the utilization of concurrency as it was implemented in the programs under study was shown to have no effect on cost performance, and that performance to development schedule, one of the purported benefits of concurrency, was actually shown to deteriorate with increases in concurrency. These results, while not an indictment of the concept of concurrency, indicate that better practices and methods are needed in the implementation of concurrency in major weapon systems. The findings are instructive to stakeholders in the weapons acquisition process in their consideration of whether and how to employ concurrent design strategies in their planning of new weapons acquisition programs.

  10. System engineering techniques for establishing balanced design and performance guidelines for the advanced telerobotic testbed

    NASA Technical Reports Server (NTRS)

    Zimmerman, W. F.; Matijevic, J. R.

    1987-01-01

    Novel system engineering techniques have been developed and applied to establishing structured design and performance objectives for the Telerobotics Testbed that reduce technical risk while still allowing the testbed to demonstrate an advancement in state-of-the-art robotic technologies. To estblish the appropriate tradeoff structure and balance of technology performance against technical risk, an analytical data base was developed which drew on: (1) automation/robot-technology availability projections, (2) typical or potential application mission task sets, (3) performance simulations, (4) project schedule constraints, and (5) project funding constraints. Design tradeoffs and configuration/performance iterations were conducted by comparing feasible technology/task set configurations against schedule/budget constraints as well as original program target technology objectives. The final system configuration, task set, and technology set reflected a balanced advancement in state-of-the-art robotic technologies, while meeting programmatic objectives and schedule/cost constraints.

  11. Considerations for Using an Incremental Scheduler for Human Exploration Task Scheduling

    NASA Technical Reports Server (NTRS)

    Jaap, John; Phillips, Shaun

    2005-01-01

    As humankind embarks on longer space missions farther from home, the requirements and environments for scheduling the activities performed on these missions are changing. As we begin to prepare for these missions it is appropriate to evaluate the merits and applicability of the different types of scheduling engines. Scheduling engines temporally arrange tasks onto a timeline so that all constraints and objectives are met and resources are not overbooked. Scheduling engines used to schedule space missions fall into three general categories: batch, mixed-initiative, and incremental. This paper presents an assessment of the engine types, a discussion of the impact of human exploration of the moon and Mars on planning and scheduling, and the applicability of the different types of scheduling engines. This paper will pursue the hypothesis that incremental scheduling engines may have a place in the new environment; they have the potential to reduce cost, to improve the satisfaction of those who execute or benefit from a particular timeline (the customers), and to allow astronauts to plan their own tasks.

  12. Biomonitoring of physiological status and cognitive performance of underway submariners undergoing a novel watch-standing schedule

    NASA Astrophysics Data System (ADS)

    Duplessis, C. A.; Cullum, M. E.; Crepeau, L. J.

    2005-05-01

    Submarine watch-standers adhere to a 6 hour-on, 12 hour-off (6/12) watch-standing schedule, yoking them to an 18-hr day, engendering circadian desynchronization and chronic sleep deprivation. Moreover, the chronic social crowding, shift work, and confinement of submarine life provide additional stressors known to correlate with elevated secretory immunoglobulin A (sIgA) and cortisol levels, reduced performance, immunologic dysfunction, malignancies, infections, gastrointestinal illness, coronary disease, anxiety, and depression. We evaluated an alternative, compressed, fixed work schedule designed to enhance circadian rhythm entrainment, sleep hygiene, performance, and health on 10 underway submariners, who followed the alternative and 6/12 schedules for approximately 2 weeks each. We measured subjects" sleep, cognitive performance, and salivary biomarker levels. Pilot analysis of the salivary data on one subject utilizing ELISA suggests elevated biomarker levels of stress. Average PM cortisol levels were 0.2 μg/L (normal range: nondetectable - 0.15 μg/L), and mean sIgA levels were 562 μg/ml (normal range: 100-500 μg/ml). Future research exploiting real-time salivary bioassays, via fluorescent polarimetry technology, identified by the Office of Naval Research (ONR) as a future Naval requirement, allows researchers to address correlations between stress-induced elaboration of salivary biomarkers with physiological and performance decrements, thereby fostering insight into the underway submariner"s psychoimmunological status. This may help identify strategies that enhance resilience to stressors. Specifically, empirically-based modeling can identify optimal watch-standing schedules and stress-mitigating procedures -- within the operational constraints of the submarine milieu and the mission --that foster improved circadian entrainment and reduced stress reactivity, enhancing physiological health, operational performance, safety, and job satisfaction.

  13. Is the technical performance of young soccer players influenced by hormonal status, sexual maturity, anthropometric profile, and physical performance?

    PubMed

    Moreira, Alexandre; Massa, Marcelo; Thiengo, Carlos R; Rodrigues Lopes, Rafael Alan; Lima, Marcelo R; Vaeyens, Roel; Barbosa, Wesley P; Aoki, Marcelo S

    2017-12-01

    The aim of this study was to examine the influence of hormonal status, anthropometric profile, sexual maturity level, and physical performance on the technical abilities of 40 young male soccer players during small-sided games (SSGs). Anthropometric profiling, saliva sampling, sexual maturity assessment (Tanner scale), and physical performance tests (Yo-Yo and vertical jumps) were conducted two weeks prior to the SSGs. Salivary testosterone was determined by the enzyme-linked immunosorbent assay method. Technical performance was determined by the frequency of actions during SSGs. Principal component analyses identified four technical actions of importance: total number of passes, effectiveness, goal attempts, and total tackles. A multivariate canonical correlation analysis was then employed to verify the prediction of a multiple dependent variables set (composed of four technical actions) from an independent set of variables, composed of testosterone concentration, stage of pubic hair and genitalia development, vertical jumps and Yo-Yo performance. A moderate-to-large relationship between the technical performance set and the independent set was observed. The canonical correlation was 0.75 with a canonical R 2 of 0.45. The highest structure coefficient in the technical performance set was observed for tackles (0.77), while testosterone presented the highest structure coefficient (0.75) for the variables of the independent set. The current data suggest that the selected independent set of variables might be useful in predicting SSG performance in young soccer players. Coaches should be aware that physical development plays a key role in technical performance to avoid decision-making mistakes during the selection of young players.

  14. Criteria and procedures for validating biomathematical models of human performance and fatigue : procedures for analysis of work schedules.

    DOT National Transportation Integrated Search

    2013-01-01

    Each railroad covered by 49 CFR 228.407 must perform an analysis of the work schedules of its train employees who are engaged in commuter or intercity rail passenger transportation and identify those schedules that, if worked by such a train employee...

  15. The impact of nontechnical skills on technical performance in surgery: a systematic review.

    PubMed

    Hull, Louise; Arora, Sonal; Aggarwal, Rajesh; Darzi, Ara; Vincent, Charles; Sevdalis, Nick

    2012-02-01

    Failures in nontechnical and teamwork skills frequently lie at the heart of harm and near-misses in the operating room (OR). The purpose of this systematic review was to assess the impact of nontechnical skills on technical performance in surgery. MEDLINE, EMBASE, PsycINFO databases were searched, and 2,041 articles were identified. After limits were applied, 341 articles were retrieved for evaluation. Of these, 28 articles were accepted for this review. Data were extracted from the articles regarding sample population, study design and setting, measures of nontechnical skills and technical performance, study findings, and limitations. Of the 28 articles that met inclusion criteria, 21 articles assessed the impact of surgeons' nontechnical skills on their technical performance. The evidence suggests that receiving feedback and effectively coping with stressful events in the OR has a beneficial impact on certain aspects of technical performance. Conversely, increased levels of fatigue are associated with detriments to surgical skill. One article assessed the impact of anesthesiologists' nontechnical skills on anesthetic technical performance, finding a strong positive correlation between the 2 skill sets. Finally, 6 articles assessed the impact of multiple nontechnical skills of the entire OR team on surgical performance. A strong relationship between teamwork failure and technical error was empirically demonstrated in these studies. Evidence suggests that certain nontechnical aspects of performance can enhance or, if lacking, contribute to deterioration of surgeons' technical performance. The precise extent of this effect remains to be elucidated. Copyright © 2012 American College of Surgeons. Published by Elsevier Inc. All rights reserved.

  16. Cure Schedule for Stycast 2651/Catalyst 11.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kropka, Jamie Michael; McCoy, John D.

    2017-11-01

    The Henkel technical data sheet (TDS) for Stycast 2651/Catalyst 11 lists three alternate cure schedules for the material, each of which would result in a different state of reaction and different material properties. Here, a cure schedule that attains full reaction of the material is defined. The use of this cure schedule will eliminate variance in material properties due to changes in the cure state of the material, and the cure schedule will serve as the method to make material prior to characterizing properties. The following recommendation was motivated by (1) a desire to cure at a single temperature formore » ease of manufacture and (2) a desire to keep the cure temperature low (to minimize residual stress build-up associated with the cooldown from the cure temperature to room temperature) without excessively limiting the cure reaction due to vitrification (i.e., material glass transition temperature, T g, exceeding cure temperature).« less

  17. Enhancing Scheduling Performance for a Wafer Fabrication Factory: The Biobjective Slack-Diversifying Nonlinear Fluctuation-Smoothing Rule

    PubMed Central

    Chen, Toly; Wang, Yu Cheng

    2012-01-01

    A biobjective slack-diversifying nonlinear fluctuation-smoothing rule (biSDNFS) is proposed in the present work to improve the scheduling performance of a wafer fabrication factory. This rule was derived from a one-factor bi-objective nonlinear fluctuation-smoothing rule (1f-biNFS) by dynamically maximizing the standard deviation of the slack, which has been shown to benefit scheduling performance by several previous studies. The efficacy of the biSDNFS was validated with a simulated case; evidence was found to support its effectiveness. We also suggested several directions in which it can be exploited in the future. PMID:23509446

  18. CONTACT: An Air Force technical report on military satellite control technology

    NASA Astrophysics Data System (ADS)

    Weakley, Christopher K.

    1993-07-01

    This technical report focuses on Military Satellite Control Technologies and their application to the Air Force Satellite Control Network (AFSCN). This report is a compilation of articles that provide an overview of the AFSCN and the Advanced Technology Program, and discusses relevant technical issues and developments applicable to the AFSCN. Among the topics covered are articles on Future Technology Projections; Future AFSCN Topologies; Modeling of the AFSCN; Wide Area Communications Technology Evolution; Automating AFSCN Resource Scheduling; Health & Status Monitoring at Remote Tracking Stations; Software Metrics and Tools for Measuring AFSCN Software Performance; Human-Computer Interface Working Group; Trusted Systems Workshop; and the University Technical Interaction Program. In addition, Key Technology Area points of contact are listed in the report.

  19. Effect of Reinforcer Magnitude on Performance Maintained by Progressive-Ratio Schedules

    PubMed Central

    Rickard, J.F; Body, S; Zhang, Z; Bradshaw, C.M; Szabadi, E

    2009-01-01

    This experiment examined the relationship between reinforcer magnitude and quantitative measures of performance on progressive-ratio schedules. Fifteen rats were trained under a progressive-ratio schedule in seven phases of the experiment in which the volume of a 0.6-M sucrose solution reinforcer was varied within the range 6–300 µl. Overall response rates in successive ratios conformed to a bitonic equation derived from Killeen's (1994) Mathematical Principles of Reinforcement. The “specific activation” parameter, a, which is presumed to reflect the incentive value of the reinforcer, was a monotonically increasing function of reinforcer volume; the “response time” parameter, δ, which defines the minimum response time, increased as a function of reinforcer volume; the “currency” parameter, β, which is presumed to reflect the coupling of responses to the reinforcer, declined as a function of volume. Running response rate (response rate calculated after exclusion of the postreinforcement pause) decayed monotonically as a function of ratio size; the index of curvature of this function increased as a function of reinforcer volume. Postreinforcement pause increased as a function of ratio size. Estimates of a derived from overall response rates and postreinforcement pauses showed a modest positive correlation across conditions and between animals. Implications of the results for the quantification of reinforcer value and for the use of progressive-ratio schedules in behavioral neuroscience are discussed. PMID:19230513

  20. Effect of reinforcer magnitude on performance maintained by progressive-ratio schedules.

    PubMed

    Rickard, J F; Body, S; Zhang, Z; Bradshaw, C M; Szabadi, E

    2009-01-01

    This experiment examined the relationship between reinforcer magnitude and quantitative measures of performance on progressive-ratio schedules. Fifteen rats were trained under a progressive-ratio schedule in seven phases of the experiment in which the volume of a 0.6-M sucrose solution reinforcer was varied within the range 6-300 microl. Overall response rates in successive ratios conformed to a bitonic equation derived from Killeen's (1994) Mathematical Principles of Reinforcement. The "specific activation" parameter, a, which is presumed to reflect the incentive value of the reinforcer, was a monotonically increasing function of reinforcer volume; the "response time" parameter, delta, which defines the minimum response time, increased as a function of reinforcer volume; the "currency" parameter, beta, which is presumed to reflect the coupling of responses to the reinforcer, declined as a function of volume. Running response rate (response rate calculated after exclusion of the postreinforcement pause) decayed monotonically as a function of ratio size; the index of curvature of this function increased as a function of reinforcer volume. Postreinforcement pause increased as a function of ratio size. Estimates of a derived from overall response rates and postreinforcement pauses showed a modest positive correlation across conditions and between animals. Implications of the results for the quantification of reinforcer value and for the use of progressive-ratio schedules in behavioral neuroscience are discussed.

  1. Spatial abilities and technical skills performance in health care: a systematic review.

    PubMed

    Langlois, Jean; Bellemare, Christian; Toulouse, Josée; Wells, George A

    2015-11-01

    The aim of this study was to conduct a systematic review and meta-analysis of the relationship between spatial abilities and technical skills performance in health care in beginners and to compare this relationship with those in intermediate and autonomous learners. Search criteria included 'spatial abilities' and 'technical skills'. Keywords related to these criteria were defined. A literature search was conducted to 20 December, 2013 in Scopus (including MEDLINE) and in several databases on EBSCOhost platforms (CINAHL Plus with Full Text, ERIC, Education Source and PsycINFO). Citations were obtained and reviewed by two independent reviewers. Articles related to retained citations were reviewed and a final list of eligible articles was determined. Articles were assessed for quality using the Scottish Intercollegiate Guidelines Network-50 assessment instrument. Data were extracted from articles in a systematic way. Correlations between spatial abilities test scores and technical skills performance were identified. A series of 8289 citations was obtained. Eighty articles were retained and fully reviewed, yielding 36 eligible articles. The systematic review found a tendency for spatial abilities to be negatively correlated with the duration of technical skills and positively correlated with the quality of technical skills performance in beginners and intermediate learners. Pooled correlations of studies were -0.46 (p = 0.03) and -0.38 (95% confidence interval [CI] -0.53 to -0.21) for duration and 0.33 (95% CI 0.20-0.44) and 0.41 (95% CI 0.26-0.54) for quality of technical skills performance in beginners and intermediate learners, respectively. However, correlations between spatial abilities test scores and technical skills performance were not statistically significant in autonomous learners. Spatial abilities are an important factor to consider in selecting and training individuals in technical skills in health care. © 2015 John Wiley & Sons Ltd.

  2. Influence of intravenous self-administered psychomotor stimulants on performance of rhesus monkeys in a multiple schedule paradigm.

    PubMed

    Hoffmeister, F

    1980-01-01

    Rhesus monkeys were trained to complete three multiple schedules. The schedules consisted of three components: a fixed interval (component 1), a variable interval (component 2), and a fixed ratio (component 3). During components 1 and 2, pressing lever 1 was always reinforced by food delivery. During component 3, pressing lever 2 resulted in either food delivery or intravenous infusions of saline solution, solutions of cocaine, of d-amphetamine, of phenmetrazine, or fenetylline. In schedule I, animals were presented with all three components independent of key-pressing behavior during components 1 and 2. In schedule II the availability of component 2 was dependent on completion of component 1. Component 3 was made available only on completion of component 2. Noncompletion of components 1 or 2 resulted in time-out of 15 and 10 min, respectively. Schedule III was identical with schedule II, except that in schedule III the completion of components was indicated only by a change in the lever lights. The influence of self-administered drugs on behavior in all three components was evaluated. Self-administration of psychomotor stimulants impaired the performance of animals and delayed completion of components 1 and 2 of schedules I, II, and III. The effects on behavior were similar with low drug intake in schedule III, moderate intake in schedule II, and high drug intake in schedule I. These effects were strong with self-administration of phenmetrazine, moderate with self-administration of cocaine and d-amphetamine, and weak with self-administration of fenetylline.

  3. Middle School A/B Block and Traditional Scheduling: An Analysis of Math and Reading Performance by Race

    ERIC Educational Resources Information Center

    Gill, Willie Wallicia Allen

    2011-01-01

    The purpose of this quantitative study was to examine whether a difference existed in the percentage performance of students earning a pass/advanced score on the Standards of Learning (SOL) Test in math and reading in Virginia's Region IV for schools using an A/B block schedule and those using a traditional schedule. The research also examined if…

  4. DSN Scheduling Engine

    NASA Technical Reports Server (NTRS)

    Clement, Bradley; Johnston, Mark; Wax, Allan; Chouinard, Caroline

    2008-01-01

    The DSN (Deep Space Network) Scheduling Engine targets all space missions that use DSN services. It allows clients to issue scheduling, conflict identification, conflict resolution, and status requests in XML over a Java Message Service interface. The scheduling requests may include new requirements that represent a set of tracks to be scheduled under some constraints. This program uses a heuristic local search to schedule a variety of schedule requirements, and is being infused into the Service Scheduling Assembly, a mixed-initiative scheduling application. The engine resolves conflicting schedules of resource allocation according to a range of existing and possible requirement specifications, including optional antennas; start of track and track duration ranges; periodic tracks; locks on track start, duration, and allocated antenna; MSPA (multiple spacecraft per aperture); arraying/VLBI (very long baseline interferometry)/delta DOR (differential one-way ranging); continuous tracks; segmented tracks; gap-to-track ratio; and override or block-out of requirements. The scheduling models now include conflict identification for SOA(start of activity), BOT (beginning of track), RFI (radio frequency interference), and equipment constraints. This software will search through all possible allocations while providing a best-effort solution at any time. The engine reschedules to accommodate individual emergency tracks in 0.2 second, and emergency antenna downtime in 0.2 second. The software handles doubling of one mission's track requests over one week (to 42 total) in 2.7 seconds. Further tests will be performed in the context of actual schedules.

  5. Astronaut Office Scheduling System Software

    NASA Technical Reports Server (NTRS)

    Brown, Estevancio

    2010-01-01

    AOSS is a highly efficient scheduling application that uses various tools to schedule astronauts weekly appointment information. This program represents an integration of many technologies into a single application to facilitate schedule sharing and management. It is a Windows-based application developed in Visual Basic. Because the NASA standard office automation load environment is Microsoft-based, Visual Basic provides AO SS developers with the ability to interact with Windows collaboration components by accessing objects models from applications like Outlook and Excel. This also gives developers the ability to create newly customizable components that perform specialized tasks pertaining to scheduling reporting inside the application. With this capability, AOSS can perform various asynchronous tasks, such as gathering/ sending/ managing astronauts schedule information directly to their Outlook calendars at any time.

  6. Surgical demand scheduling: a review.

    PubMed Central

    Magerlein, J M; Martin, J B

    1978-01-01

    This article reviews the literature on scheduling of patient demand for surgery and outlines an approach to improving overall performance of hospital surgical suites. Reported scheduling systems are categorized into those that schedule patients in advance of the surgical date and those that schedule available patients on the day of surgery. Approaches to estimating surgical procedure times are also reviewed, and the article concludes with a discussion of the failure to implement the majority of reported scheduling schemes. PMID:367987

  7. Investigations into Generalization of Constraint-Based Scheduling Theories with Applications to Space Telescope Observation Scheduling

    NASA Technical Reports Server (NTRS)

    Muscettola, Nicola; Smith, Steven S.

    1996-01-01

    This final report summarizes research performed under NASA contract NCC 2-531 toward generalization of constraint-based scheduling theories and techniques for application to space telescope observation scheduling problems. Our work into theories and techniques for solution of this class of problems has led to the development of the Heuristic Scheduling Testbed System (HSTS), a software system for integrated planning and scheduling. Within HSTS, planning and scheduling are treated as two complementary aspects of the more general process of constructing a feasible set of behaviors of a target system. We have validated the HSTS approach by applying it to the generation of observation schedules for the Hubble Space Telescope. This report summarizes the HSTS framework and its application to the Hubble Space Telescope domain. First, the HSTS software architecture is described, indicating (1) how the structure and dynamics of a system is modeled in HSTS, (2) how schedules are represented at multiple levels of abstraction, and (3) the problem solving machinery that is provided. Next, the specific scheduler developed within this software architecture for detailed management of Hubble Space Telescope operations is presented. Finally, experimental performance results are given that confirm the utility and practicality of the approach.

  8. The use of a checklist improves anaesthesiologists' technical and non-technical performance for simulated malignant hyperthermia management.

    PubMed

    Hardy, Jean-Baptiste; Gouin, Antoine; Damm, Cédric; Compère, Vincent; Veber, Benoît; Dureuil, Bertrand

    2018-02-01

    Anaesthesiologists may occasionally manage life-threatening operating room (OR) emergencies. Managing OR emergencies implies real-time analysis of often complicated situations, prompt medical knowledge retrieval, coordinated teamwork and effective decision making in stressful settings. Checklists are recommended to improve performance and reduce the risk of medical errors. This study aimed to assess the usefulness of the French Society of Anaesthesia and Intensive Care's (SFAR) "Malignant Hyperthermia" (MH) checklist on a simulated episode of MH crisis and management thereof by registered anesthesiologists. Twenty-four anaesthesiologists were allocated to 2 groups (checklist and control). Their technical performance in adherence with the SFAR guidelines was assessed by a 30-point score and their non-technical performance was assessed by the Anaesthetists' Non-Technical Skills (ANTS) score. Every task completion was assessed independently. Data are shown as median (first-third quartiles). Anaesthesiologists in the checklist group had higher technical performance scores (24/30 (21.5-25) vs 18/30 (15.5-19.5), P=0.002) and ANTS scores (56.5/60 (47.5-58) vs 48.5/60 (41-50.5), P=0.024). They administered the complete initial dose of dantrolene (2mg/kg) more quickly (15.7 minutes [13.9-18.3] vs 22.4 minutes [18.6-25]) than the control group (P=0.017). However, anaesthesiologists deemed the usability of the checklist to be perfectible. Registered anaesthesiologists' use of the MH checklist during a simulation session widely improved their adherence to guidelines and non-technical skills. This study strongly suggests the benefit of checklist tools for emergency management. Notwithstanding, better awareness and training for anaesthesiologists could further improve the use of this tool. Copyright © 2017 Société française d'anesthésie et de réanimation (Sfar). Published by Elsevier Masson SAS. All rights reserved.

  9. Automated Platform Management System Scheduling

    NASA Technical Reports Server (NTRS)

    Hull, Larry G.

    1990-01-01

    The Platform Management System was established to coordinate the operation of platform systems and instruments. The management functions are split between ground and space components. Since platforms are to be out of contact with the ground more than the manned base, the on-board functions are required to be more autonomous than those of the manned base. Under this concept, automated replanning and rescheduling, including on-board real-time schedule maintenance and schedule repair, are required to effectively and efficiently meet Space Station Freedom mission goals. In a FY88 study, we developed several promising alternatives for automated platform planning and scheduling. We recommended both a specific alternative and a phased approach to automated platform resource scheduling. Our recommended alternative was based upon use of exactly the same scheduling engine in both ground and space components of the platform management system. Our phased approach recommendation was based upon evolutionary development of the platform. In the past year, we developed platform scheduler requirements and implemented a rapid prototype of a baseline platform scheduler. Presently we are rehosting this platform scheduler rapid prototype and integrating the scheduler prototype into two Goddard Space Flight Center testbeds, as the ground scheduler in the Scheduling Concepts, Architectures, and Networks Testbed and as the on-board scheduler in the Platform Management System Testbed. Using these testbeds, we will investigate rescheduling issues, evaluate operational performance and enhance the platform scheduler prototype to demonstrate our evolutionary approach to automated platform scheduling. The work described in this paper was performed prior to Space Station Freedom rephasing, transfer of platform responsibility to Code E, and other recently discussed changes. We neither speculate on these changes nor attempt to predict the impact of the final decisions. As a consequence some of our

  10. Factors that influence the non-technical skills performance of scrub nurses: a prospective study.

    PubMed

    Kang, Evelyn; Massey, Debbie; Gillespie, Brigid M

    2015-12-01

    To identify and describe the factors that impact on the performance of scrub nurses' non-technical skills performance during the intra-operative phase of surgery. Non-technical skills have been identified as important precursors to errors in the operating room. However, few studies have investigated factors influencing non-technical skills of scrub nurses. Prospective observational study. Structured observations were performed on a sample of 182 surgical procedures across eight specialities by two trained observers from August 2012-April 2013 at two hospital sites. Participants were purposively selected scrub nurses. Bivariate correlations and a multiple linear regression model were used to identify associations among length of surgery, patients' acuity using the American Society of Anesthesiologists classification system, team familiarity, number of occasions scout nurses leave the operating room, change of scout nurse and the outcome, the non-technical skills performance of scrub nurses. Patient acuity and team familiarity were the strongest predictors of scrub nurses' non-technical skills performance at hospital site A. There were no correlations between the predictors and the performance of scrub nurses at hospital site B. A dedicated surgical team and patient acuity potentially influence the performance of scrub nurses' non-technical skills. Familiarity with team members foster advanced planning, thus minimizing distractions and interruptions that impact on scrub nurses' performance. Development of interventions aimed at improving non-technical skills has the potential to make a substantial difference and enhance patient care. © 2015 John Wiley & Sons Ltd.

  11. The Effect of Technical Performance on Patient Outcomes in Surgery: A Systematic Review.

    PubMed

    Fecso, Andras B; Szasz, Peter; Kerezov, Georgi; Grantcharov, Teodor P

    2017-03-01

    Systematic review of the effect of intraoperative technical performance on patient outcomes. The operating room is a high-stakes, high-risk environment. As a result, the quality of surgical interventions affecting patient outcomes has been the subject of discussion and research for years. MEDLINE, EMBASE, PsycINFO, and Cochrane databases were searched. All surgical specialties were eligible for inclusion. Data were reviewed in regards to the methods by which technical performance was measured, what patient outcomes were assessed, and how intraoperative technical performance affected patient outcomes. Quality of evidence was assessed using the Medical Education Research Study Quality Instrument (MERSQI). Of the 12,758 studies initially identified, 24 articles (7775 total participants) were ultimately included in this review. Seventeen studies assessed the performance of the faculty alone, 2 assessed both the faculty and trainees, 1 assessed trainees alone, and in 4 studies, the level of the operating surgeon was not specified. In 18 studies, a performance assessment tool was used. Patient outcomes were evaluated using intraoperative complications, short-term morbidity, long-term morbidity, short-term mortality, and long-term mortality. The average MERSQI score was 11.67 (range 9.5-14.5). Twenty-one studies demonstrated that superior technical performance was related to improved patient outcomes. The results of this systematic review demonstrated that superior technical performance positively affects patient outcomes. Despite this initial evidence, more robust research is needed to directly assess intraoperative technical performance and its effect on postoperative patient outcomes using meaningful assessment instruments and reliable processes.

  12. The role of the production scheduling system in rescheduling

    NASA Astrophysics Data System (ADS)

    Kalinowski, K.; Grabowik, C.; Kempa, W.; Paprocka, I.

    2015-11-01

    The paper presents the rescheduling problem in the context of cooperation between production scheduling system (PSS) and other units in an integrated manufacturing environment - decision makers and software systems. The main aim is to discuss the PSS functionality for maximizing automation of the rescheduling process, reducing the response time and improving the quality of generated solutions. PSSs operate in the meeting of tactical and operational level of planning and control, and play an important role in the production preparation and control. On the basis of information about orders, technology and production system state (e.g. resources availability) they prepare and/or update a detailed plan of production flow - a schedule. All necessary data for scheduling and rescheduling are usually collected in other systems both from organizational and technical production preparation, e.g. ERP, PLM, MES, CAPP or others, as well as they are entered directly by the decision- makers/operators. Data acquired in this way are often incomplete and inconsistent. Therefore the existing rescheduling software works according to interactive method - rather support but does not replace the human decision maker in tasks planning. When rescheduling, due to the limited amount of time to make a decision this interaction is particularly important. An additional problem arises in data acquisition, in the process of data exchanging between systems or in the identification of new data sources and their processing. Different approaches to rescheduling were characterized, including those solutions, where all these operations are carried out by an autonomous system and those in which scheduling is performed only upon request from the outside, for the newly created scheduling data representing the current state of the production system.

  13. Some effects of 8- vs 10-hour work schedules on the test performance/alertness of air traffic control specialists.

    DOT National Transportation Integrated Search

    1995-12-01

    A 10-hour, 4-day rotating shift schedule worked by some Air Traffic Control Specialists (ATCSs) was compared to the more traditional 8-hour, 2-2-1 rapidly rotating schedule. Measures of performance and alertness were obtained from a group of 52 ATCSs...

  14. Scheduling: A guide for program managers

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The following topics are discussed concerning scheduling: (1) milestone scheduling; (2) network scheduling; (3) program evaluation and review technique; (4) critical path method; (5) developing a network; (6) converting an ugly duckling to a swan; (7) network scheduling problem; (8) (9) network scheduling when resources are limited; (10) multi-program considerations; (11) influence on program performance; (12) line-of-balance technique; (13) time management; (14) recapitulization; and (15) analysis.

  15. Scheduling from the perspective of the application

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berman, F.; Wolski, R.

    1996-12-31

    Metacomputing is the aggregation of distributed and high-performance resources on coordinated networks. With careful scheduling, resource-intensive applications can be implemented efficiently on metacomputing systems at the sizes of interest to developers and users. In this paper we focus on the problem of scheduling applications on metacomputing systems. We introduce the concept of application-centric scheduling in which everything about the system is evaluated in terms of its impact on the application. Application-centric scheduling is used by virtually all metacomputer programmers to achieve performance on metacomputing systems. We describe two successful metacomputing applications to illustrate this approach, and describe AppLeS scheduling agentsmore » which generalize the application-centric scheduling approach. Finally, we show preliminary results which compare AppLeS-derived schedules with conventional strip and blocked schedules for a two-dimensional Jacobi code.« less

  16. Fatigue, Work Schedules, and Perceived Performance in Bedside Care Nurses.

    PubMed

    Sagherian, Knar; Clinton, Michael E; Abu-Saad Huijer, Huda; Geiger-Brown, Jeanne

    2017-07-01

    Hospital nurses are expected to maintain optimal work performance; yet, fatigue can threaten safe practice and result in unfavorable patient outcomes. This descriptive cross-sectional study explored the association between fatigue, work schedules, and perceived work performance among nurses. The study sample included 77 bedside nurses who were mostly female, single, and between 20 and 29 years of age. The majority worked 8-hour shifts and overtime. Nurses who worked during off days reported significantly higher chronic fatigue compared with those nurses who took time off. Nurses who reported feeling refreshed after sleep had significantly less chronic and acute fatigue and more intershift recovery. Nurses with acute and chronic fatigue perceived poorer physical performance. Also, nurses who reported chronic fatigue perceived they were less alert and less able to concentrate when providing patient care. Less effective communication was also associated with acute and chronic fatigue. In conclusion, fatigue has safety implications for nurses' practice that should be monitored by nursing management.

  17. Associations between shift schedule characteristics with sleep, need for recovery, health and performance measures for regular (semi-)continuous 3-shift systems.

    PubMed

    van de Ven, Hardy A; Brouwer, Sandra; Koolhaas, Wendy; Goudswaard, Anneke; de Looze, Michiel P; Kecklund, Göran; Almansa, Josue; Bültmann, Ute; van der Klink, Jac J L

    2016-09-01

    In this cross-sectional study associations were examined between eight shift schedule characteristics with shift-specific sleep complaints and need for recovery and generic health and performance measures. It was hypothesized that shift schedule characteristics meeting ergonomic recommendations are associated with better sleep, need for recovery, health and performance. Questionnaire data were collected from 491 shift workers of 18 companies with 9 regular (semi)-continuous shift schedules. The shift schedule characteristics were analyzed separately and combined using multilevel linear regression models. The hypothesis was largely not confirmed. Relatively few associations were found, of which the majority was in the direction as expected. In particular early starts of morning shifts and many consecutive shifts seem to be avoided. The healthy worker effect, limited variation between included schedules and the cross-sectional design might explain the paucity of significant results. Copyright © 2016 Elsevier Ltd. All rights reserved.

  18. Performance of technical trading rules: evidence from Southeast Asian stock markets.

    PubMed

    Tharavanij, Piyapas; Siraprapasiri, Vasan; Rajchamaha, Kittichai

    2015-01-01

    This paper examines the profitability of technical trading rules in the five Southeast Asian stock markets. The data cover a period of 14 years from January 2000 to December 2013. The instruments investigated are five Southeast Asian stock market indices: SET index (Thailand), FTSE Bursa Malaysia KLC index (Malaysia), FTSE Straits Times index (Singapore), JSX Composite index (Indonesia), and PSE composite index (the Philippines). Trading strategies investigated include Relative Strength Index, Stochastic oscillator, Moving Average Convergence-Divergence, Directional Movement Indicator and On Balance Volume. Performances are compared to a simple Buy-and-Hold. Statistical tests are also performed. Our empirical results show a strong performance of technical trading rules in an emerging stock market of Thailand but not in a more mature stock market of Singapore. The technical trading rules also generate statistical significant returns in the Malaysian, Indonesian and the Philippine markets. However, after taking transaction costs into account, most technical trading rules do not generate net returns. This fact suggests different levels of market efficiency among Southeast Asian stock markets. This paper finds three new insights. Firstly, technical indicators does not help much in terms of market timing. Basically, traders cannot expect to buy at a relative low price and sell at a relative high price by just using technical trading rules. Secondly, technical trading rules can be beneficial to individual investors as they help them to counter the behavioral bias called disposition effects which is the tendency to sell winning stocks too soon and holding on to losing stocks too long. Thirdly, even profitable strategies could not reliably predict subsequent market directions. They make money from having a higher average profit from profitable trades than an average loss from unprofitable ones.

  19. TRU Waste Management Program. Cost/schedule optimization analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office Rockwell International (JIO/RI) during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, taskmore » guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short-term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. Systems models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less

  20. 76 FR 57681 - Modification of Interlibrary Loan Fee Schedule

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-16

    ... Agricultural Library. The revised fee schedule is based on the method of payment used (traditional invoicing through the National Technical Information Service (NTIS) or payment through the Online Computer Library... Branch, National Agricultural Library, 10301 Baltimore Avenue, Beltsville, MD 20705-2351. Telephone (301...

  1. Evaluation of scheduling techniques for payload activity planning

    NASA Technical Reports Server (NTRS)

    Bullington, Stanley F.

    1991-01-01

    Two tasks related to payload activity planning and scheduling were performed. The first task involved making a comparison of space mission activity scheduling problems with production scheduling problems. The second task consisted of a statistical analysis of the output of runs of the Experiment Scheduling Program (ESP). Details of the work which was performed on these two tasks are presented.

  2. 2B-Alert Web: An Open-Access Tool for Predicting the Effects of Sleep/Wake Schedules and Caffeine Consumption on Neurobehavioral Performance.

    PubMed

    Reifman, Jaques; Kumar, Kamal; Wesensten, Nancy J; Tountas, Nikolaos A; Balkin, Thomas J; Ramakrishnan, Sridhar

    2016-12-01

    Computational tools that predict the effects of daily sleep/wake amounts on neurobehavioral performance are critical components of fatigue management systems, allowing for the identification of periods during which individuals are at increased risk for performance errors. However, none of the existing computational tools is publicly available, and the commercially available tools do not account for the beneficial effects of caffeine on performance, limiting their practical utility. Here, we introduce 2B-Alert Web, an open-access tool for predicting neurobehavioral performance, which accounts for the effects of sleep/wake schedules, time of day, and caffeine consumption, while incorporating the latest scientific findings in sleep restriction, sleep extension, and recovery sleep. We combined our validated Unified Model of Performance and our validated caffeine model to form a single, integrated modeling framework instantiated as a Web-enabled tool. 2B-Alert Web allows users to input daily sleep/wake schedules and caffeine consumption (dosage and time) to obtain group-average predictions of neurobehavioral performance based on psychomotor vigilance tasks. 2B-Alert Web is accessible at: https://2b-alert-web.bhsai.org. The 2B-Alert Web tool allows users to obtain predictions for mean response time, mean reciprocal response time, and number of lapses. The graphing tool allows for simultaneous display of up to seven different sleep/wake and caffeine schedules. The schedules and corresponding predicted outputs can be saved as a Microsoft Excel file; the corresponding plots can be saved as an image file. The schedules and predictions are erased when the user logs off, thereby maintaining privacy and confidentiality. The publicly accessible 2B-Alert Web tool is available for operators, schedulers, and neurobehavioral scientists as well as the general public to determine the impact of any given sleep/wake schedule, caffeine consumption, and time of day on performance of a

  3. The Vehicle Integrated Performance Analysis Experience: Reconnecting With Technical Integration

    NASA Technical Reports Server (NTRS)

    McGhee, D. S.

    2006-01-01

    Very early in the Space Launch Initiative program, a small team of engineers at MSFC proposed a process for performing system-level assessments of a launch vehicle. Aimed primarily at providing insight and making NASA a smart buyer, the Vehicle Integrated Performance Analysis (VIPA) team was created. The difference between the VIPA effort and previous integration attempts is that VIPA a process using experienced people from various disciplines, which focuses them on a technically integrated assessment. The foundations of VIPA s process are described. The VIPA team also recognized the need to target early detailed analysis toward identifying significant systems issues. This process is driven by the T-model for technical integration. VIPA s approach to performing system-level technical integration is discussed in detail. The VIPA process significantly enhances the development and monitoring of realizable project requirements. VIPA s assessment validates the concept s stated performance, identifies significant issues either with the concept or the requirements, and then reintegrates these issues to determine impacts. This process is discussed along with a description of how it may be integrated into a program s insight and review process. The VIPA process has gained favor with both engineering and project organizations for being responsive and insightful

  4. Technical and tactical skills related to performance levels in tennis: A systematic review.

    PubMed

    Kolman, Nikki S; Kramer, Tamara; Elferink-Gemser, Marije T; Huijgen, Barbara C H; Visscher, Chris

    2018-06-11

    The aim of this systematic review is to provide an overview of outcome measures and instruments identified in the literature for examining technical and tactical skills in tennis related to performance levels. Such instruments can be used to identify talent or the specific skill development training needs of particular players. Searches for this review were conducted using the PubMed, Web of Science, and PsycInfo databases. Out of 733 publications identified through these searches, 40 articles were considered relevant and included in this study. They were divided into three categories: (1) technical skills, (2) tactical skills and (3) integrated technical and tactical skills. There was strong evidence that technical skills (ball velocity and to a lesser extent ball accuracy) and tactical skills (decision making, anticipation, tactical knowledge and visual search strategies) differed among players according to their performance levels. However, integrated measurement of these skills is required, because winning a point largely hinges on a tactical decision to perform a particular stroke (i.e., technical execution). Therefore, future research should focus on examining the relationship between these skills and tennis performance and on the development of integrated methods for measuring these skills.

  5. Advanced transportation system studies, technical area 3. Alternate propulsion subsystem concepts: J-2S restart study

    NASA Astrophysics Data System (ADS)

    Vilja, John; Levack, Daniel

    1993-04-01

    The objectives were to assess what design changes would be required to remit late production of the J-2S engine for use as a large high energy upper stage engine. The study assessed design changes required to perform per the J-2S model specification, manufacturing changes required due to obsolescence or improvements in state-of-the-practice, availability issues for supplier provided items, and provided cost and schedule estimates for this configuration. The confidence that J-2S production could be reinitiated within reasonable costs and schedules was provided. No significant technical issues were identified in either the producibility study or in the review of previous technical data. Areas of potential cost reduction were identified which could be quantified to a greater extent with further manufacturing planning. The proposed schedule can be met with no foreseeable impacts. The results of the study provided the necessary foundation for the detailed manufacturing and test plans and non-recurring and recurring cost estimates that are needed to complete the effort to reinitiate production of the J-2S engine system.

  6. Cost and schedule analytical techniques development

    NASA Technical Reports Server (NTRS)

    1994-01-01

    This contract provided technical services and products to the Marshall Space Flight Center's Engineering Cost Office (PP03) and the Program Plans and Requirements Office (PP02) for the period of 3 Aug. 1991 - 30 Nov. 1994. Accomplishments summarized cover the REDSTAR data base, NASCOM hard copy data base, NASCOM automated data base, NASCOM cost model, complexity generators, program planning, schedules, NASA computer connectivity, other analytical techniques, and special project support.

  7. Revisiting the utility of technical performance scores following tetralogy of Fallot repair.

    PubMed

    Lodin, Daud; Mavrothalassitis, Orestes; Haberer, Kim; Sunderji, Sherzana; Quek, Ruben G W; Peyvandi, Shabnam; Moon-Grady, Anita; Karamlou, Tara

    2017-08-01

    Although an important quality metric, current technical performance scores may not be generalizable and may omit operative factors that influence outcomes. We examined factors not included in current technical performance scores that may contribute to increased postoperative length of stay, major complications, and cost after primary repair of tetralogy of Fallot. This is a retrospective single site study of patients younger than age 2 years with tetralogy of Fallot undergoing complete repair between 2007 and 2015. Medical record data and discharge echocardiograms were reviewed to ascertain component and composite technical performance scores. Primary outcomes included postoperative length of stay, major complications, and total hospital costs. Multivariable logistic and linear regression identified determinants of each outcome. Patient population (n = 115) had a median postoperative length of stay of 8 days (interquartile range, 6-10 days), and a median total cost of $71,147. Major complications occurred in 33 patients (29%) with 1 death. Technical performance scores assigned were optimum in 28 patients (25%), adequate in 59 patients (52%), and inadequate in 26 patients (23%). Neither technical performance score components nor composite scores were associated with increased postoperative length of stay. Optimum or adequate repairs versus inadequate had equal risk of a complication (P = .79), and equivalent mean total cost ($100,000 vs $187,000; P = .25). Longer cardiopulmonary bypass time per 1-minute increase (P < .01) was associated with longer postoperative length of stay and reintervention (P = .02). The need to return to bypass also increased total cost (P < .01). Current tetralogy of Fallot technical performance scores were not associated with selected outcomes in our postoperative population. Although returning to bypass and bypass length are not included as components in the current score, these are important factors influencing

  8. Mental Fatigue: Impairment of Technical Performance in Small-Sided Soccer Games.

    PubMed

    Badin, Oliver O; Smith, Mitchell R; Conte, Daniele; Coutts, Aaron J

    2016-11-01

    To assess the effects of mental fatigue on physical and technical performance in small-sided soccer games. Twenty soccer players (age 17.8 ± 1.0 y, height 179 ± 5 cm, body mass 72.4 ± 6.8 kg, playing experience 8.3 ± 1.4 y) from an Australian National Premier League soccer club volunteered to participate in this randomized crossover investigation. Participants played 15-min 5-vs-5 small-sided games (SSGs) without goalkeepers on 2 occasions separated by 1 wk. Before the SSG, 1 team watched a 30-min emotionally neutral documentary (control), while the other performed 30 min of a computer-based Stroop task (mental fatigue). Subjective ratings of mental and physical fatigue were recorded before and after treatment and after the SSG. Motivation was assessed before treatment and SSG; mental effort was assessed after treatment and SSG. Player activity profiles and heart rate (HR) were measured throughout the SSG, whereas ratings of perceived exertion (RPEs) were recorded before the SSG and immediately after each half. Video recordings of the SSG allowed for notational analysis of technical variables. Subjective ratings of mental fatigue and effort were higher after the Stroop task, whereas motivation for the upcoming SSG was similar between conditions. HR during the SSG was possibly higher in the control condition, whereas RPE was likely higher in the mental-fatigue condition. Mental fatigue had an unclear effect on most physical-performance variables but impaired most technical-performance variables. Mental fatigue impairs technical but not physical performance in small-sided soccer games.

  9. [Toward a New Immunization Schedule in Spain, 2016 (Part 1)].

    PubMed

    Limia-Sánchez, Aurora; Andreu, María Mar; Torres de Mier, María de Viarce; Navarro-Alonso, José Antonio

    2016-03-08

    The immunization Schedule is a dynamic public health tool that has incorporated different changes over the years influenced by the epidemiologic situation and the scientific evidence. The Immunization Advisory Committee [Ponencia de Programa y Registro de Vacunaciones], as the Interterritorial Council scientific and technical advisory body, carries out assessments of different programmes and vaccines and proposes changes that after approval will be introduced in the Regions schedule. This article is divided into two parts presenting the rationale followed to propose a new schedule for the immunization against diphtheria, tetanus, pertussis, hepatitis B and invasive disease by Haemophilus influenzae type b. This first part is focused in the reasoning to undertake the assessment, the review of the immunization policy and the impact of immunization in Spain, as well as a review of the immunization schedules in similar countries.

  10. Analysis of Application Power and Schedule Composition in a High Performance Computing Environment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Elmore, Ryan; Gruchalla, Kenny; Phillips, Caleb

    As the capacity of high performance computing (HPC) systems continues to grow, small changes in energy management have the potential to produce significant energy savings. In this paper, we employ an extensive informatics system for aggregating and analyzing real-time performance and power use data to evaluate energy footprints of jobs running in an HPC data center. We look at the effects of algorithmic choices for a given job on the resulting energy footprints, and analyze application-specific power consumption, and summarize average power use in the aggregate. All of these views reveal meaningful power variance between classes of applications as wellmore » as chosen methods for a given job. Using these data, we discuss energy-aware cost-saving strategies based on reordering the HPC job schedule. Using historical job and power data, we present a hypothetical job schedule reordering that: (1) reduces the facility's peak power draw and (2) manages power in conjunction with a large-scale photovoltaic array. Lastly, we leverage this data to understand the practical limits on predicting key power use metrics at the time of submission.« less

  11. Technical and physical determinants of soccer match-play performance in elite youth soccer players.

    PubMed

    Rowat, Owain; Fenner, Jonathan; Unnithan, Viswanath

    2017-04-01

    The aim of this study was to evaluate whether physical performance characteristics could be a better predictor than technical skills in determining the technical level of county soccer players in a match situation. With institutional ethics approval, 25 male youth soccer players aged 16-18.5 years from a professional soccer academy in South East Asia were selected and height and body mass were recorded. Players were tested for sexual maturity (pubertal development scale [PDS] self-assessment), aerobic capacity (yo-yo intermittent recovery test level 1 [YYIR1]), repeated sprint ability (7 x 35 m sprints) acceleration (15 m sprint) and four soccer skills tests (dribble with pass, dribbling speed, passing and shooting accuracy). Players' technical ability during match play was assessed in small-sided games of soccer (5 v 5) using a novel game technical scoring chart (scoring chart completed by coaches to assess technical performance in a match situation) developed from criteria (e.g., first touch, dribbling and two footedness) used by youth soccer coaches for talent identification. A Spearman's rank correlation showed the YYIR1 test and 15 m sprint test were limited in predicting technical match performance (r=0.03, P=0.88, r=-0.23, P=0.32 respectively). A Pearson product moment correlation showed that the repeated sprint test was also limited in predicting technical match performance (r=-0.34, P=0.14). A dribbling skill with a pass was found to be the best determinant of a player's technical ability in a match (r=-0.57, P=0.00). Talent identification and selection programs in Asian youth soccer should include a dribbling skill performed with a pass.

  12. Squaring the Project Management Circle: Updating the Cost, Schedule, and Performance Methodology

    DTIC Science & Technology

    2016-04-30

    success is measured as achieving technical performance and/or mission performance goals, coupled with customer (warfighter) satisfaction (De Wit, 1988...studies added criteria such as customer satisfaction , efficiency of execution, and effectiveness of the project organization (Pinto & Slevin, 1998...team and the user customer organization, management policy and project control. This clustering of success factors represents the amalgamation of the

  13. Integrated resource scheduling in a distributed scheduling environment

    NASA Technical Reports Server (NTRS)

    Zoch, David; Hall, Gardiner

    1988-01-01

    The Space Station era presents a highly-complex multi-mission planning and scheduling environment exercised over a highly distributed system. In order to automate the scheduling process, customers require a mechanism for communicating their scheduling requirements to NASA. A request language that a remotely-located customer can use to specify his scheduling requirements to a NASA scheduler, thus automating the customer-scheduler interface, is described. This notation, Flexible Envelope-Request Notation (FERN), allows the user to completely specify his scheduling requirements such as resource usage, temporal constraints, and scheduling preferences and options. The FERN also contains mechanisms for representing schedule and resource availability information, which are used in the inter-scheduler inconsistency resolution process. Additionally, a scheduler is described that can accept these requests, process them, generate schedules, and return schedule and resource availability information to the requester. The Request-Oriented Scheduling Engine (ROSE) was designed to function either as an independent scheduler or as a scheduling element in a network of schedulers. When used in a network of schedulers, each ROSE communicates schedule and resource usage information to other schedulers via the FERN notation, enabling inconsistencies to be resolved between schedulers. Individual ROSE schedules are created by viewing the problem as a constraint satisfaction problem with a heuristically guided search strategy.

  14. Technical Performance as a Predictor of Clinical Outcomes in Laparoscopic Gastric Cancer Surgery.

    PubMed

    Fecso, Andras B; Bhatti, Junaid A; Stotland, Peter K; Quereshy, Fayez A; Grantcharov, Teodor P

    2018-03-23

    The purpose of this study was to evaluate the relationship between technical performance and patient outcomes in laparoscopic gastric cancer surgery. Laparoscopic gastrectomy for cancer is an advanced procedure with high rate of postoperative morbidity and mortality. Many variables including patient, disease, and perioperative management factors have been shown to impact postoperative outcomes; however, the role of surgical performance is insufficiently investigated. A retrospective review was performed for all patients who had undergone laparoscopic gastrectomy for cancer at 3 teaching institutions between 2009 and 2015. Patients with available, unedited video-recording of their procedure were included in the study. Video files were rated for technical performance, using Objective Structured Assessments of Technical Skills (OSATS) and Generic Error Rating Tool instruments. The main outcome variable was major short-term complications. The effect of technical performance on patient outcomes was assessed using logistic regression analysis with backward selection strategy. Sixty-one patients with available video recordings were included in the study. The overall complication rate was 29.5%. The mean Charlson comorbidity index, type of procedure, and the global OSATS score were included in the final predictive model. Lower performance score (OSATS ≤29) remained an independent predictor for major short-term outcomes (odds ratio 6.49), while adjusting for comorbidities and type of procedure. Intraoperative technical performance predicts major short-term outcomes in laparoscopic gastrectomy for cancer. Ongoing assessment and enhancement of surgical skills using modern, evidence-based strategies might improve short-term patient outcomes. Future work should focus on developing and studying the effectiveness of such interventions in laparoscopic gastric cancer surgery.

  15. The Effect of Immersion Scheduling on Academic Performance and Students' Ratings of Instructors

    ERIC Educational Resources Information Center

    Richmond, Aaron S.; Murphy, Bridget C.; Curl, Layton S.; Broussard, Kristin A.

    2015-01-01

    During the past decades, little research has investigated the effects of immersion scheduling on the psychology classroom. Therefore, we sought to compare academic performance of students in 2-week immersion psychology courses to that of students in traditional 16-week courses. In Study 1, students who received instruction in a 2-week immersion…

  16. Producing Satisfactory Solutions to Scheduling Problems: An Iterative Constraint Relaxation Approach

    NASA Technical Reports Server (NTRS)

    Chien, S.; Gratch, J.

    1994-01-01

    One drawback to using constraint-propagation in planning and scheduling systems is that when a problem has an unsatisfiable set of constraints such algorithms typically only show that no solution exists. While, technically correct, in practical situations, it is desirable in these cases to produce a satisficing solution that satisfies the most important constraints (typically defined in terms of maximizing a utility function). This paper describes an iterative constraint relaxation approach in which the scheduler uses heuristics to progressively relax problem constraints until the problem becomes satisfiable. We present empirical results of applying these techniques to the problem of scheduling spacecraft communications for JPL/NASA antenna resources.

  17. Response Strength in Extreme Multiple Schedules

    ERIC Educational Resources Information Center

    McLean, Anthony P.; Grace, Randolph C.; Nevin, John A.

    2012-01-01

    Four pigeons were trained in a series of two-component multiple schedules. Reinforcers were scheduled with random-interval schedules. The ratio of arranged reinforcer rates in the two components was varied over 4 log units, a much wider range than previously studied. When performance appeared stable, prefeeding tests were conducted to assess…

  18. Cost and Schedule Analytical Techniques Development

    NASA Technical Reports Server (NTRS)

    1998-01-01

    This Final Report summarizes the activities performed by Science Applications International Corporation (SAIC) under contract NAS 8-40431 "Cost and Schedule Analytical Techniques Development Contract" (CSATD) during Option Year 3 (December 1, 1997 through November 30, 1998). This Final Report is in compliance with Paragraph 5 of Section F of the contract. This CSATD contract provides technical products and deliverables in the form of parametric models, databases, methodologies, studies, and analyses to the NASA Marshall Space Flight Center's (MSFC) Engineering Cost Office (PP03) and the Program Plans and Requirements Office (PP02) and other user organizations. Detailed Monthly Reports were submitted to MSFC in accordance with the contract's Statement of Work, Section IV "Reporting and Documentation". These reports spelled out each month's specific work performed, deliverables submitted, major meetings conducted, and other pertinent information. Therefore, this Final Report will summarize these activities at a higher level. During this contract Option Year, SAIC expended 25,745 hours in the performance of tasks called out in the Statement of Work. This represents approximately 14 full-time EPs. Included are the Huntsville-based team, plus SAIC specialists in San Diego, Ames Research Center, Tampa, and Colorado Springs performing specific tasks for which they are uniquely qualified.

  19. The effect of split sleep schedules (6h-on/6h-off) on neurobehavioural performance, sleep and sleepiness.

    PubMed

    Short, Michelle A; Centofanti, Stephanie; Hilditch, Cassie; Banks, Siobhan; Lushington, Kurt; Dorrian, Jillian

    2016-05-01

    Shorter, more frequent rosters, such as 6h-on/6h-off split shifts, may offer promise to sleep, subjective sleepiness and performance by limiting shift length and by offering opportunities for all workers to obtain some sleep across the biological night. However, there exists a paucity of studies that have examined these shifts using objective measures of sleep and performance. The present study examined neurobehavioural performance, sleepiness and sleep during 6h-on/6h-off split sleep schedules. Sixteen healthy adults (6 males, 26.13 y ± 4.46) participated in a 9-day laboratory study that included two baseline nights (BL, 10h time in bed (TIB), 2200 h-0800 h), 4 days on one of two types of 6h-on/6h-off split sleep schedules with 5h TIB during each 'off' period (6h early: TIB 0300 h-0800 h and 1500 h-20000 h, or 6-h late: TIB 0900 h-1400 h and 2100 h-0200 h), and two recovery nights (10h TIB per night, 2200 h-0800 h). Participants received 10h TIB per 24h in total across both shift schedules. A neurobehavioural test bout was completed every 2 h during wake, which included the Psychomotor Vigilance Task (PVT) and the Karolinska Sleepiness Scale (KSS). Linear mixed effects models were used to assess the effect of day (BL, shift days 1-4), schedule (6h early, 6h late) and trial (numbers 1-6) on PVT lapses (operationalised as the number of reaction times >500 ms), PVT total lapse time, PVT fastest 10% of reaction times and KSS. Analyses were also conducted examining the effect of day and schedule on sleep variables. Overall, PVT lapses and total lapse time did not differ significantly between baseline and shift days, however, peak response speeds were significantly slower on the first shift day when compared to baseline, but only for those in the 6h-late condition. Circadian variations were apparent in performance outcomes, with individuals in the 6h-late condition demonstrated significantly more and longer lapses and slower peak reaction times at the end of their

  20. Comparison of Final Grades between a Traditional Classroom and Learning Community Classroom at Northeast Wisconsin Technical College.

    ERIC Educational Resources Information Center

    Van Beek, Dianne

    This study examines courses in the marketing program at Northeast Wisconsin Technical College to compare the academic performance of students in traditional and learning community classroom settings. Two sections of students, a traditional 17-week course and a block scheduled 5-week course, served as the sample in the study. The block scheduling…

  1. Vehicle and driver scheduling for public transit.

    DOT National Transportation Integrated Search

    2009-08-01

    The problem of driver scheduling involves the construction of a legal set of shifts, including allowance : of overtime, which cover the blocks in a particular vehicle schedule. A shift is the work scheduled to be performed by : a driver in one day, w...

  2. The impact of fatigue on the non-technical skills performance of critical care air ambulance clinicians.

    PubMed

    Myers, J A; Powell, D M C; Aldington, S; Sim, D; Psirides, A; Hathaway, K; Haney, M F

    2017-11-01

    The relationship between fatigue-related risk and impaired clinical performance is not entirely clear. Non-technical factors represent an important component of clinical performance and may be sensitive to the effects of fatigue. The hypothesis was that the sum score of overall non-technical performance is degraded by fatigue. Nineteen physicians undertook two different simulated air ambulance missions, once when rested, and once when fatigued (randomised crossover design). Trained assessors blinded to participants' fatigue status performed detailed structured assessments based on expected behaviours in four non-technical skills domains: teamwork, situational awareness, task management, and decision making. Participants also provided self-ratings of their performance. The primary endpoint was the sum score of overall non-technical performance. The main finding, the overall non-technical skills performance rating of the clinicians, was better in rested than fatigued states (mean difference with 95% CI, 2.8 [2.2-3.4]). The findings remained consistent across individual non-technical skills domains; also when controlling for an order effect and examining the impact of a number of possible covariates. There was no difference in self-ratings of clinical performance between rested and fatigued states. Non-technical performance of critical care air transfer clinicians is degraded when they are fatigued. Fatigued clinicians may fail to recognise the degree to which their performance is compromised. These findings represent risk to clinical care quality and patient safety in the dynamic and isolated environment of air ambulance transfer. © 2017 The Acta Anaesthesiologica Scandinavica Foundation. Published by John Wiley & Sons Ltd.

  3. Testing Task Schedulers on Linux System

    NASA Astrophysics Data System (ADS)

    Jelenković, Leonardo; Groš, Stjepan; Jakobović, Domagoj

    Testing task schedulers on Linux operating system proves to be a challenging task. There are two main problems. The first one is to identify which properties of the scheduler to test. The second problem is how to perform it, e.g., which API to use that is sufficiently precise and in the same time supported on most platforms. This paper discusses the problems in realizing test framework for testing task schedulers and presents one potential solution. Observed behavior of the scheduler is the one used for “normal” task scheduling (SCHED_OTHER), unlike one used for real-time tasks (SCHED_FIFO, SCHED_RR).

  4. 48 CFR 2937.602 - Elements of performance-based contracting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... objectively measurable incentives (e.g., Firm-Fixed-Price, Fixed-Price-Incentive-Fee, or Cost-Plus-Incentive-Fee) is appropriate. However, when contractor performance (e.g., cost control, schedule, or quality/technical) is best evaluated subjectively using qualitative measures, a Cost-Plus-Award-Fee contract may be...

  5. Effect of Uncertainty on Deterministic Runway Scheduling

    NASA Technical Reports Server (NTRS)

    Gupta, Gautam; Malik, Waqar; Jung, Yoon C.

    2012-01-01

    Active runway scheduling involves scheduling departures for takeoffs and arrivals for runway crossing subject to numerous constraints. This paper evaluates the effect of uncertainty on a deterministic runway scheduler. The evaluation is done against a first-come- first-serve scheme. In particular, the sequence from a deterministic scheduler is frozen and the times adjusted to satisfy all separation criteria; this approach is tested against FCFS. The comparison is done for both system performance (throughput and system delay) and predictability, and varying levels of congestion are considered. The modeling of uncertainty is done in two ways: as equal uncertainty in availability at the runway as for all aircraft, and as increasing uncertainty for later aircraft. Results indicate that the deterministic approach consistently performs better than first-come-first-serve in both system performance and predictability.

  6. Performance Evaluation of Indian Technical Institutions Using PROMETHEE-GAIA Approach

    ERIC Educational Resources Information Center

    Ranjan, Rajeev; Chakraborty, Shankar

    2015-01-01

    It has now become an important issue to evaluate the performance of technical institutions to develop better research and enrich the existing teaching processes. The results of such performance appraisal would serve as a reference point for decisions to choose a particular institution, hire manpower, and provide financial support for the…

  7. Advanced Technology System Scheduling Governance Model

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ang, Jim; Carnes, Brian; Hoang, Thuc

    In the fall of 2005, the Advanced Simulation and Computing (ASC) Program appointed a team to formulate a governance model for allocating resources and scheduling the stockpile stewardship workload on ASC capability systems. This update to the original document takes into account the new technical challenges and roles for advanced technology (AT) systems and the new ASC Program workload categories that must be supported. The goal of this updated model is to effectively allocate and schedule AT computing resources among all three National Nuclear Security Administration (NNSA) laboratories for weapons deliverables that merit priority on this class of resource. Themore » process outlined below describes how proposed work can be evaluated and approved for resource allocations while preserving high effective utilization of the systems. This approach will provide the broadest possible benefit to the Stockpile Stewardship Program (SSP).« less

  8. Do PICU patients meet technical criteria for performing indirect calorimetry?

    PubMed

    Beggs, Megan R; Garcia Guerra, Gonzalo; Larsen, Bodil M K

    2016-10-01

    Indirect calorimetry (IC) is considered gold standard for assessing energy needs of critically ill children as predictive equations and clinical status indicators are often unreliable. Accurate assessment of energy requirements in this vulnerable population is essential given the high risk of over or underfeeding and the consequences thereof. The proportion of patients and patient days in pediatric intensive care (PICU) for which energy expenditure (EE) can be measured using IC is currently unknown. In the current study, we aimed to quantify the daily proportion of consecutive PICU patients who met technical criteria to perform indirect calorimetry and describe the technical contraindications when criteria were not met. Prospective, observational, single-centre study conducted in a cardiac and general PICU. All consecutive patients admitted for at least 96 h were included in the study. Variables collected for each patient included age at admission, admission diagnosis, and if technical criteria for indirect calorimetry were met. Technical criteria variables were collected within the same 2 h each morning and include: provision of supplemental oxygen, ventilator settings, endotracheal tube (ETT) leak, diagnosis of chest tube air leak, provision of external gas support (i.e. nitric oxide), and provision of extracorporeal membrane oxygenation (ECMO). 288 patients were included for a total of 3590 patient days between June 2014 and February 2015. The main reasons for admission were: surgery (cardiac and non-cardiac), respiratory distress, trauma, oncology and medicine/other. The median (interquartile range) patient age was 0.7 (0.3-4.6) years. The median length of PICU stay was 7 (5-14) days. Only 34% (95% CI, 32.4-35.5%) of patient days met technical criteria for IC. For patients less than 6 months of age, technical criteria were met on significantly fewer patient days (29%, p < 0.01). Moreover, 27% of patients did not meet technical criteria for IC on any day

  9. The LSST OCS scheduler design

    NASA Astrophysics Data System (ADS)

    Delgado, Francisco; Schumacher, German

    2014-08-01

    The Large Synoptic Survey Telescope (LSST) is a complex system of systems with demanding performance and operational requirements. The nature of its scientific goals requires a special Observatory Control System (OCS) and particularly a very specialized automatic Scheduler. The OCS Scheduler is an autonomous software component that drives the survey, selecting the detailed sequence of visits in real time, taking into account multiple science programs, the current external and internal conditions, and the history of observations. We have developed a SysML model for the OCS Scheduler that fits coherently in the OCS and LSST integrated model. We have also developed a prototype of the Scheduler that implements the scheduling algorithms in the simulation environment provided by the Operations Simulator, where the environment and the observatory are modeled with real weather data and detailed kinematics parameters. This paper expands on the Scheduler architecture and the proposed algorithms to achieve the survey goals.

  10. 7 CFR 275.20 - ME review schedules.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false ME review schedules. 275.20 Section 275.20 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE... Program Performance § 275.20 ME review schedules. (a) Each State agency shall submit its review schedule...

  11. 7 CFR 275.20 - ME review schedules.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 4 2012-01-01 2012-01-01 false ME review schedules. 275.20 Section 275.20 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE... Program Performance § 275.20 ME review schedules. (a) Each State agency shall submit its review schedule...

  12. 7 CFR 275.20 - ME review schedules.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 4 2011-01-01 2011-01-01 false ME review schedules. 275.20 Section 275.20 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE... Program Performance § 275.20 ME review schedules. (a) Each State agency shall submit its review schedule...

  13. 7 CFR 275.20 - ME review schedules.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 4 2013-01-01 2013-01-01 false ME review schedules. 275.20 Section 275.20 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE... Program Performance § 275.20 ME review schedules. (a) Each State agency shall submit its review schedule...

  14. The Isolation of Motivational, Motoric, and Schedule Effects on Operant Performance: A Modeling Approach

    PubMed Central

    Brackney, Ryan J; Cheung, Timothy H. C; Neisewander, Janet L; Sanabria, Federico

    2011-01-01

    Dissociating motoric and motivational effects of pharmacological manipulations on operant behavior is a substantial challenge. To address this problem, we applied a response-bout analysis to data from rats trained to lever press for sucrose on variable-interval (VI) schedules of reinforcement. Motoric, motivational, and schedule factors (effort requirement, deprivation level, and schedule requirements, respectively) were manipulated. Bout analysis found that interresponse times (IRTs) were described by a mixture of two exponential distributions, one characterizing IRTs within response bouts, another characterizing intervals between bouts. Increasing effort requirement lengthened the shortest IRT (the refractory period between responses). Adding a ratio requirement increased the length and density of response bouts. Both manipulations also decreased the bout-initiation rate. In contrast, food deprivation only increased the bout-initiation rate. Changes in the distribution of IRTs over time showed that responses during extinction were also emitted in bouts, and that the decrease in response rate was primarily due to progressively longer intervals between bouts. Taken together, these results suggest that changes in the refractory period indicate motoric effects, whereas selective alterations in bout initiation rate indicate incentive-motivational effects. These findings support the use of response-bout analyses to identify the influence of pharmacological manipulations on processes underlying operant performance. PMID:21765544

  15. An algorithm for a single machine scheduling problem with sequence dependent setup times and scheduling windows

    NASA Technical Reports Server (NTRS)

    Moore, J. E.

    1975-01-01

    An enumeration algorithm is presented for solving a scheduling problem similar to the single machine job shop problem with sequence dependent setup times. The scheduling problem differs from the job shop problem in two ways. First, its objective is to select an optimum subset of the available tasks to be performed during a fixed period of time. Secondly, each task scheduled is constrained to occur within its particular scheduling window. The algorithm is currently being used to develop typical observational timelines for a telescope that will be operated in earth orbit. Computational times associated with timeline development are presented.

  16. OrbView-3 Technical Performance Evaluation 2005: Modulation Transfer Function

    NASA Technical Reports Server (NTRS)

    Cole, Aaron

    2007-01-01

    The Technical performance evaluation of OrbView-3 using the Modulation Transfer Function (MTF) is presented. The contents include: 1) MTF Results and Methodology; 2) Radiometric Calibration Methodology; and 3) Relative Radiometric Assessment Results

  17. 14 CFR 399.81 - Unrealistic or deceptive scheduling.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Unrealistic or deceptive scheduling. 399.81... Unrealistic or deceptive scheduling. (a) It is the policy of the Board to consider unrealistic scheduling of... to the advertising of scheduled performance, it is the policy of the Board to regard as an unfair or...

  18. Development of Watch Schedule Using Rules Approach

    NASA Astrophysics Data System (ADS)

    Jurkevicius, Darius; Vasilecas, Olegas

    The software for schedule creation and optimization solves a difficult, important and practical problem. The proposed solution is an online employee portal where administrator users can create and manage watch schedules and employee requests. Each employee can login with his/her own account and see his/her assignments, manage requests, etc. Employees set as administrators can perform the employee scheduling online, manage requests, etc. This scheduling software allows users not only to see the initial and optimized watch schedule in a simple and understandable form, but also to create special rules and criteria and input their business. The system using rules automatically will generate watch schedule.

  19. Intra-operative disruptions, surgeon's mental workload, and technical performance in a full-scale simulated procedure.

    PubMed

    Weigl, Matthias; Stefan, Philipp; Abhari, Kamyar; Wucherer, Patrick; Fallavollita, Pascal; Lazarovici, Marc; Weidert, Simon; Euler, Ekkehard; Catchpole, Ken

    2016-02-01

    Surgical flow disruptions occur frequently and jeopardize perioperative care and surgical performance. So far, insights into subjective and cognitive implications of intra-operative disruptions for surgeons and inherent consequences for performance are inconsistent. This study aimed to investigate the effect of surgical flow disruption on surgeon's intra-operative workload and technical performance. In a full-scale OR simulation, 19 surgeons were randomly allocated to either of the two disruption scenarios (telephone call vs. patient discomfort). Using a mixed virtual reality simulator with a computerized, high-fidelity mannequin, all surgeons were trained in performing a vertebroplasty procedure and subsequently performed such a procedure under experimental conditions. Standardized measures on subjective workload and technical performance (trocar positioning deviation from expert-defined standard, number, and duration of X-ray acquisitions) were collected. Intra-operative workload during simulated disruption scenarios was significantly higher compared to training sessions (p < .01). Surgeons in the telephone call scenario experienced significantly more distraction compared to their colleagues in the patient discomfort scenario (p < .05). However, workload tended to be increased in surgeons who coped with distractions due to patient discomfort. Technical performance was not significantly different between both disruption scenarios. We found a significant association between surgeons' intra-operative workload and technical performance such that surgeons with increased mental workload tended to perform worse (β = .55, p = .04). Surgical flow disruptions affect surgeons' intra-operative workload. Increased mental workload was associated with inferior technical performance. Our simulation-based findings emphasize the need to establish smooth surgical flow which is characterized by a low level of process deviations and disruptions.

  20. Nuclear Waste: Defense Waste Processing Facility-Cost, Schedule, and Technical Issues.

    DTIC Science & Technology

    1992-06-17

    gallons of high-level radioactive waste stored in underground tanks at the savannah major facility involved Is the Defense Waste Processing Facility ( DwPF ...As a result of concerns about potential problems with the DWPF and delays in its scheduled start-up, the Chairman of the Environment, Energy, and...Natural Resources Subcommittee, House Committee on Government Operations, asked GAO to review the status of the DWPF and other facilities. This report

  1. Genetic algorithm based task reordering to improve the performance of batch scheduled massively parallel scientific applications

    DOE PAGES

    Sankaran, Ramanan; Angel, Jordan; Brown, W. Michael

    2015-04-08

    The growth in size of networked high performance computers along with novel accelerator-based node architectures has further emphasized the importance of communication efficiency in high performance computing. The world's largest high performance computers are usually operated as shared user facilities due to the costs of acquisition and operation. Applications are scheduled for execution in a shared environment and are placed on nodes that are not necessarily contiguous on the interconnect. Furthermore, the placement of tasks on the nodes allocated by the scheduler is sub-optimal, leading to performance loss and variability. Here, we investigate the impact of task placement on themore » performance of two massively parallel application codes on the Titan supercomputer, a turbulent combustion flow solver (S3D) and a molecular dynamics code (LAMMPS). Benchmark studies show a significant deviation from ideal weak scaling and variability in performance. The inter-task communication distance was determined to be one of the significant contributors to the performance degradation and variability. A genetic algorithm-based parallel optimization technique was used to optimize the task ordering. This technique provides an improved placement of the tasks on the nodes, taking into account the application's communication topology and the system interconnect topology. As a result, application benchmarks after task reordering through genetic algorithm show a significant improvement in performance and reduction in variability, therefore enabling the applications to achieve better time to solution and scalability on Titan during production.« less

  2. A System for Automatically Generating Scheduling Heuristics

    NASA Technical Reports Server (NTRS)

    Morris, Robert

    1996-01-01

    The goal of this research is to improve the performance of automated schedulers by designing and implementing an algorithm by automatically generating heuristics by selecting a schedule. The particular application selected by applying this method solves the problem of scheduling telescope observations, and is called the Associate Principal Astronomer. The input to the APA scheduler is a set of observation requests submitted by one or more astronomers. Each observation request specifies an observation program as well as scheduling constraints and preferences associated with the program. The scheduler employs greedy heuristic search to synthesize a schedule that satisfies all hard constraints of the domain and achieves a good score with respect to soft constraints expressed as an objective function established by an astronomer-user.

  3. Dispatch Scheduling of Automated Telescopes

    NASA Astrophysics Data System (ADS)

    Denny, R. B.

    2004-05-01

    Automated telescope scheduling systems have traditionally focused on optimiz- ing the use of the observatory, minimizing overhead and maximizing shutter- open time. However, educational and amateur observatories do not enjoy con- sistently good skies. Conditions can change significantly during an observing session, leading to schedule breakage. This gives rise to the need for a scheduling system that is capable of recovering from periods of bad skies, wind, etc. without operator intervention. The concept of dispatch scheduling, where the scheduler makes a "best" choice for the next observation, will be discussed. The choice of next target must consider constraints such as mini- mum altitude or maximum air mass, moon illumination, and sky condition, as well as timing constraints that may arise from linked observations and/or target phasing requirements. It also must be as fair and efficient as prac- tical. A dispatch scheduler (ACPS) was constructed and used to perform a num- ber of simulations with both isolated and multiple/linked observations, and noisy timing. By varying "best next target" choice algorithm, these simula- tions provided insight into the behavior of a dispatch scheduler. This talk will describe the scheduler and present the results of these preliminary sim- ulations, some conclusions that arose from them, and outline areas for fur- ther research.

  4. Wave scheduling - Decentralized scheduling of task forces in multicomputers

    NASA Technical Reports Server (NTRS)

    Van Tilborg, A. M.; Wittie, L. D.

    1984-01-01

    Decentralized operating systems that control large multicomputers need techniques to schedule competing parallel programs called task forces. Wave scheduling is a probabilistic technique that uses a hierarchical distributed virtual machine to schedule task forces by recursively subdividing and issuing wavefront-like commands to processing elements capable of executing individual tasks. Wave scheduling is highly resistant to processing element failures because it uses many distributed schedulers that dynamically assign scheduling responsibilities among themselves. The scheduling technique is trivially extensible as more processing elements join the host multicomputer. A simple model of scheduling cost is used by every scheduler node to distribute scheduling activity and minimize wasted processing capacity by using perceived workload to vary decentralized scheduling rules. At low to moderate levels of network activity, wave scheduling is only slightly less efficient than a central scheduler in its ability to direct processing elements to accomplish useful work.

  5. Co-scheduling of network resource provisioning and host-to-host bandwidth reservation on high-performance network and storage systems

    DOEpatents

    Yu, Dantong; Katramatos, Dimitrios; Sim, Alexander; Shoshani, Arie

    2014-04-22

    A cross-domain network resource reservation scheduler configured to schedule a path from at least one end-site includes a management plane device configured to monitor and provide information representing at least one of functionality, performance, faults, and fault recovery associated with a network resource; a control plane device configured to at least one of schedule the network resource, provision local area network quality of service, provision local area network bandwidth, and provision wide area network bandwidth; and a service plane device configured to interface with the control plane device to reserve the network resource based on a reservation request and the information from the management plane device. Corresponding methods and computer-readable medium are also disclosed.

  6. Job Superscheduler Architecture and Performance in Computational Grid Environments

    NASA Technical Reports Server (NTRS)

    Shan, Hongzhang; Oliker, Leonid; Biswas, Rupak

    2003-01-01

    Computational grids hold great promise in utilizing geographically separated heterogeneous resources to solve large-scale complex scientific problems. However, a number of major technical hurdles, including distributed resource management and effective job scheduling, stand in the way of realizing these gains. In this paper, we propose a novel grid superscheduler architecture and three distributed job migration algorithms. We also model the critical interaction between the superscheduler and autonomous local schedulers. Extensive performance comparisons with ideal, central, and local schemes using real workloads from leading computational centers are conducted in a simulation environment. Additionally, synthetic workloads are used to perform a detailed sensitivity analysis of our superscheduler. Several key metrics demonstrate that substantial performance gains can be achieved via smart superscheduling in distributed computational grids.

  7. A systematic review of the sleep, sleepiness, and performance implications of limited wake shift work schedules.

    PubMed

    Short, Michelle A; Agostini, Alexandra; Lushington, Kurt; Dorrian, Jillian

    2015-09-01

    The aim of this review was to identify which limited wake shift work schedules (LWSW) best promote sleep, alertness, and performance. LWSW are fixed work/rest cycles where the time-at-work does is ≤8 hours and there is >1 rest period per day, on average, for ≥2 consecutive days. These schedules are commonly used in safety-critical industries such as transport and maritime industries. Literature was sourced using PubMed, Embase, PsycInfo, Scopus, and Google Scholar databases. We identified 20 independent studies (plus a further 2 overlapping studies), including 5 laboratory and 17 field-based studies focused on maritime watch keepers, ship bridge officers, and long-haul train drivers. The measurement of outcome measures was varied, incorporating subjective and objective measures of sleep: sleep diaries (N=5), actigraphy (N=4), and polysomnography, (N=3); sleepiness: Karolinska Sleepiness Scale (N=5), visual analog scale (VAS) alertness (N=2) and author-derived measures (N=2); and performance: Psychomotor Vigilance Test (PVT) (N=5), Reaction Time or Vigilance tasks (N=4), Vector and Letter Cancellation Test (N=1), and subjective performance (N=2). Of the three primary rosters examined (6 hours-on/6 hours-off, 8 hours-on/8 hours-off and 4 hours-on/8 hours-off), the 4 hours-on/8 hours-off roster was associated with better sleep and lower levels of sleepiness. Individuals working 4 hours-on/8 hours-off rosters averaged 1 hour more sleep per night than those working 6 hours-on/6 hours-off and 1.3 hours more sleep than those working 8 hours-on/8 hours-off (P<0.01). More broadly, findings indicate that LWSW schedules were associated with better sleep and lower sleepines in the case of (i) shorter time-at-work, (ii) more frequent rest breaks, (iii) shifts that start and end at the same clock time every 24 hours, and (iv) work shifts commencing in the daytime (as opposed to night). The findings for performance remain incomplete due to the small number of studies

  8. Dental Student Study Strategies: Are Self-Testing and Scheduling Related to Academic Performance?

    PubMed

    McAndrew, Maureen; Morrow, Christina S; Atiyeh, Lindsey; Pierre, Gaëlle C

    2016-05-01

    Self-testing, a strategy wherein a student actively engages in creating questions and answers from study materials to assist with studying, has been found to be especially advantageous because it enhances future retrieval of information. Studies have found correlations among students' grade point averages (GPAs), self-testing, and rereading study strategies, as well as the spacing of study sessions over time. The aim of this study was to assess relationships among dental students' study strategies, scheduling of study time, and academic achievement. A 16-item survey requesting information on study habits, study schedules, and GPAs was distributed to 358 second-year dental students at New York University College of Dentistry. Additionally, the survey asked students to report the average number of hours per week they devoted to studying for didactic courses and preparing for hands-on preclinical courses. Of the 358 students, 94 (26%) responded to the survey. The vast majority of the respondents reported utilizing self-testing and rereading study strategies. High performers (with higher GPAs) were more likely to use self-testing, especially with flashcards, and to space their studying over multiple sessions. Lower performing students were more likely to highlight or underline their notes and to mass their study sessions or cram. Longer hours devoted to studying and practicing for simulation courses were associated with stronger performance; lower performers reported spending significantly fewer hours practicing for simulation courses. Half of the dental students surveyed said that they felt their studying would be more productive in the morning, although 84% reported doing most of their studying in the evening or late night. Sound study decisions depend on accurate regulation of ongoing learning and appropriate use and timing of evidence-based study strategies, so these results suggest that dental students may require guidance in these areas.

  9. Integrated Campaign Probabilistic Cost, Schedule, Performance, and Value for Program Office Support

    NASA Technical Reports Server (NTRS)

    Cornelius, David; Sasamoto, Washito; Daugherty, Kevin; Deacon, Shaun

    2012-01-01

    This paper describes an integrated assessment tool developed at NASA Langley Research Center that incorporates probabilistic analysis of life cycle cost, schedule, launch performance, on-orbit performance, and value across a series of planned space-based missions, or campaign. Originally designed as an aid in planning the execution of missions to accomplish the National Research Council 2007 Earth Science Decadal Survey, it utilizes Monte Carlo simulation of a series of space missions for assessment of resource requirements and expected return on investment. Interactions between simulated missions are incorporated, such as competition for launch site manifest, to capture unexpected and non-linear system behaviors. A novel value model is utilized to provide an assessment of the probabilistic return on investment. A demonstration case is discussed to illustrate the tool utility.

  10. Mixed Criticality Scheduling for Industrial Wireless Sensor Networks

    PubMed Central

    Jin, Xi; Xia, Changqing; Xu, Huiting; Wang, Jintao; Zeng, Peng

    2016-01-01

    Wireless sensor networks (WSNs) have been widely used in industrial systems. Their real-time performance and reliability are fundamental to industrial production. Many works have studied the two aspects, but only focus on single criticality WSNs. Mixed criticality requirements exist in many advanced applications in which different data flows have different levels of importance (or criticality). In this paper, first, we propose a scheduling algorithm, which guarantees the real-time performance and reliability requirements of data flows with different levels of criticality. The algorithm supports centralized optimization and adaptive adjustment. It is able to improve both the scheduling performance and flexibility. Then, we provide the schedulability test through rigorous theoretical analysis. We conduct extensive simulations, and the results demonstrate that the proposed scheduling algorithm and analysis significantly outperform existing ones. PMID:27589741

  11. Scheduling Operations for Massive Heterogeneous Clusters

    NASA Technical Reports Server (NTRS)

    Humphrey, John; Spagnoli, Kyle

    2013-01-01

    High-performance computing (HPC) programming has become increasingly difficult with the advent of hybrid supercomputers consisting of multicore CPUs and accelerator boards such as the GPU. Manual tuning of software to achieve high performance on this type of machine has been performed by programmers. This is needlessly difficult and prone to being invalidated by new hardware, new software, or changes in the underlying code. A system was developed for task-based representation of programs, which when coupled with a scheduler and runtime system, allows for many benefits, including higher performance and utilization of computational resources, easier programming and porting, and adaptations of code during runtime. The system consists of a method of representing computer algorithms as a series of data-dependent tasks. The series forms a graph, which can be scheduled for execution on many nodes of a supercomputer efficiently by a computer algorithm. The schedule is executed by a dispatch component, which is tailored to understand all of the hardware types that may be available within the system. The scheduler is informed by a cluster mapping tool, which generates a topology of available resources and their strengths and communication costs. Software is decoupled from its hardware, which aids in porting to future architectures. A computer algorithm schedules all operations, which for systems of high complexity (i.e., most NASA codes), cannot be performed optimally by a human. The system aids in reducing repetitive code, such as communication code, and aids in the reduction of redundant code across projects. It adds new features to code automatically, such as recovering from a lost node or the ability to modify the code while running. In this project, the innovators at the time of this reporting intend to develop two distinct technologies that build upon each other and both of which serve as building blocks for more efficient HPC usage. First is the scheduling and dynamic

  12. Task scheduling in dataflow computer architectures

    NASA Technical Reports Server (NTRS)

    Katsinis, Constantine

    1994-01-01

    Dataflow computers provide a platform for the solution of a large class of computational problems, which includes digital signal processing and image processing. Many typical applications are represented by a set of tasks which can be repetitively executed in parallel as specified by an associated dataflow graph. Research in this area aims to model these architectures, develop scheduling procedures, and predict the transient and steady state performance. Researchers at NASA have created a model and developed associated software tools which are capable of analyzing a dataflow graph and predicting its runtime performance under various resource and timing constraints. These models and tools were extended and used in this work. Experiments using these tools revealed certain properties of such graphs that require further study. Specifically, the transient behavior at the beginning of the execution of a graph can have a significant effect on the steady state performance. Transformation and retiming of the application algorithm and its initial conditions can produce a different transient behavior and consequently different steady state performance. The effect of such transformations on the resource requirements or under resource constraints requires extensive study. Task scheduling to obtain maximum performance (based on user-defined criteria), or to satisfy a set of resource constraints, can also be significantly affected by a transformation of the application algorithm. Since task scheduling is performed by heuristic algorithms, further research is needed to determine if new scheduling heuristics can be developed that can exploit such transformations. This work has provided the initial development for further long-term research efforts. A simulation tool was completed to provide insight into the transient and steady state execution of a dataflow graph. A set of scheduling algorithms was completed which can operate in conjunction with the modeling and performance tools

  13. Computer Supported Education at Fox Valley Technical Institute. IBM Application Brief.

    ERIC Educational Resources Information Center

    International Business Machines Corp., White Plains, NY.

    Fox Valley Technical Institute (FVTI) has developed an approach to education which emphasizes competency-based, round-the-clock education entailing short terms, flexible class schedules, and individualized instruction and which has as its focus strong computer support at classroom, technical, and management levels. The college provides 6,000…

  14. Multiresource allocation and scheduling for periodic soft real-time applications

    NASA Astrophysics Data System (ADS)

    Gopalan, Kartik; Chiueh, Tzi-cker

    2001-12-01

    Real-time applications that utilize multiple system resources, such as CPU, disks, and network links, require coordinated scheduling of these resources in order to meet their end-to-end performance requirements. Most state-of-the-art operating systems support independent resource allocation and deadline-driven scheduling but lack coordination among multiple heterogeneous resources. This paper describes the design and implementation of an Integrated Real-time Resource Scheduler (IRS) that performs coordinated allocation and scheduling of multiple heterogeneous resources on the same machine for periodic soft real-time application. The principal feature of IRS is a heuristic multi-resource allocation algorithm that reserves multiple resources for real-time applications in a manner that can maximize the number of applications admitted into the system in the long run. At run-time, a global scheduler dispatches the tasks of the soft real-time application to individual resource schedulers according to the precedence constraints between tasks. The individual resource schedulers, which could be any deadline based schedulers, can make scheduling decisions locally and yet collectively satisfy a real-time application's performance requirements. The tightness of overall timing guarantees is ultimately determined by the properties of individual resource schedulers. However, IRS maximizes overall system resource utilization efficiency by coordinating deadline assignment across multiple tasks in a soft real-time application.

  15. Human-Machine Collaborative Optimization via Apprenticeship Scheduling

    DTIC Science & Technology

    2016-09-09

    prenticeship Scheduling (COVAS), which performs ma- chine learning using human expert demonstration, in conjunction with optimization, to automatically and ef...ficiently produce optimal solutions to challenging real- world scheduling problems. COVAS first learns a policy from human scheduling demonstration via...apprentice- ship learning , then uses this initial solution to provide a tight bound on the value of the optimal solution, thereby substantially

  16. EoC Study Update to Examine the Cost, Schedule and Technical Changes to NASA Projects

    NASA Technical Reports Server (NTRS)

    Bitten, Bob; Emmons, Debra; Shinn, Stephen; Scolese, Chris

    2018-01-01

    The original National Aeronautics and Space Administration (NASA) Explanation of Change (EoC) study was conducted in 2010 to understand the underlying causes of cost and schedule growth. The first study consisted of 25 missions launched from 2000 to 2010 and looked at the events that led to growth. These events were categorized into different bins that were rolled up to quantify whether the growth was due to internal planning, or internal execution, or from external forces and found that the growth was evenly distributed among those three categories. The result of the study presented nine considerations focused at reducing growth due to project external events and internal planning events. Although no one 'magic bullet' consideration was discovered in the previous work, the nine considerations taken as a whole were postulated to help reduce cost and schedule change in future NASA missions. A recent update was conducted that included investigating 8 missions developed since the previous study to determine if the results were different. Cost, schedule, and mass increases were analyzed from the start of Phase B through Preliminary Design Review and Critical Design Review to Launch. As shown in this paper, the results are better with overall cost and schedule growth being reduced. The paper will show a comparison of the previous results to the updated results to show specific reductions and provide an explanation of which recommendations were followed.

  17. Optimized technical and scientific design approach for high performance anticoincidence shields

    NASA Astrophysics Data System (ADS)

    Graue, Roland; Stuffler, Timo; Monzani, Franco; Bastia, Paolo; Gryksa, Werner; Pahl, Germit

    2018-04-01

    This paper, "Optimized technical and scientific design approach for high performance anticoincidence shields," was presented as part of International Conference on Space Optics—ICSO 1997, held in Toulouse, France.

  18. Longitudinal Trend Analysis of Performance Indicators for South Carolina's Technical Colleges

    ERIC Educational Resources Information Center

    Hossain, Mohammad Nurul

    2010-01-01

    This study included an analysis of the trend of performance indicators for the technical college sector of higher education in South Carolina. In response to demands for accountability and transparency in higher education, the state of South Carolina developed sector specific performance indicators to measure various educational outcomes for each…

  19. 7. PHOTOCOPY OF DRAWING (UNDATED PLAN AND SCHEDULE DRAWING BY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. PHOTOCOPY OF DRAWING (UNDATED PLAN AND SCHEDULE DRAWING BY THE DEPARTMENT OF THE AIR FORCE, SPACE AND MISSILE TEST CENTER) MATERIAL SPECIFICATIONS AND GENERAL NOTES FOR INTERIOR FINISHING FOR BUILDING 762-A, SHEET A4 - Vandenberg Air Force Base, Space Launch Complex 3, Technical Support Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  20. Shuttle payload interface verification equipment study. Volume 2: Technical document, part 1

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The technical analysis is reported that was performed during the shuttle payload interface verification equipment study. It describes: (1) the background and intent of the study; (2) study approach and philosophy covering all facets of shuttle payload/cargo integration; (3)shuttle payload integration requirements; (4) preliminary design of the horizontal IVE; (5) vertical IVE concept; and (6) IVE program development plans, schedule and cost. Also included is a payload integration analysis task to identify potential uses in addition to payload interface verification.

  1. Engineering Technical Review Planning Briefing

    NASA Technical Reports Server (NTRS)

    Gardner, Terrie

    2012-01-01

    The general topics covered in the engineering technical planning briefing are 1) overviews of NASA, Marshall Space Flight Center (MSFC), and Engineering, 2) the NASA Systems Engineering(SE) Engine and its implementation , 3) the NASA Project Life Cycle, 4) MSFC Technical Management Branch Services in relation to the SE Engine and the Project Life Cycle , 5) Technical Reviews, 6) NASA Human Factor Design Guidance , and 7) the MSFC Human Factors Team. The engineering technical review portion of the presentation is the primary focus of the overall presentation and will address the definition of a design review, execution guidance, the essential stages of a technical review, and the overall review planning life cycle. Examples of a technical review plan content, review approaches, review schedules, and the review process will be provided and discussed. The human factors portion of the presentation will focus on the NASA guidance for human factors. Human factors definition, categories, design guidance, and human factor specialist roles will be addressed. In addition, the NASA Systems Engineering Engine description, definition, and application will be reviewed as background leading into the NASA Project Life Cycle Overview and technical review planning discussion.

  2. Technical Efficiency and Organ Transplant Performance: A Mixed-Method Approach

    PubMed Central

    de-Pablos-Heredero, Carmen; Fernández-Renedo, Carlos; Medina-Merodio, Jose-Amelio

    2015-01-01

    Mixed methods research is interesting to understand complex processes. Organ transplants are complex processes in need of improved final performance in times of budgetary restrictions. As the main objective a mixed method approach is used in this article to quantify the technical efficiency and the excellence achieved in organ transplant systems and to prove the influence of organizational structures and internal processes in the observed technical efficiency. The results show that it is possible to implement mechanisms for the measurement of the different components by making use of quantitative and qualitative methodologies. The analysis show a positive relationship between the levels related to the Baldrige indicators and the observed technical efficiency in the donation and transplant units of the 11 analyzed hospitals. Therefore it is possible to conclude that high levels in the Baldrige indexes are a necessary condition to reach an increased level of the service offered. PMID:25950653

  3. Mental Fatigue Impairs Soccer-Specific Physical and Technical Performance.

    PubMed

    Smith, Mitchell R; Coutts, Aaron J; Merlini, Michele; Deprez, Dieter; Lenoir, Matthieu; Marcora, Samuele M

    2016-02-01

    To investigate the effects of mental fatigue on soccer-specific physical and technical performance. This investigation consisted of two separate studies. Study 1 assessed the soccer-specific physical performance of 12 moderately trained soccer players using the Yo-Yo Intermittent Recovery Test, Level 1 (Yo-Yo IR1). Study 2 assessed the soccer-specific technical performance of 14 experienced soccer players using the Loughborough Soccer Passing and Shooting Tests (LSPT, LSST). Each test was performed on two occasions and preceded, in a randomized, counterbalanced order, by 30 min of the Stroop task (mentally fatiguing treatment) or 30 min of reading magazines (control treatment). Subjective ratings of mental fatigue were measured before and after treatment, and mental effort and motivation were measured after treatment. Distance run, heart rate, and ratings of perceived exertion were recorded during the Yo-Yo IR1. LSPT performance time was calculated as original time plus penalty time. LSST performance was assessed using shot speed, shot accuracy, and shot sequence time. Subjective ratings of mental fatigue and effort were higher after the Stroop task in both studies (P < 0.001), whereas motivation was similar between conditions. This mental fatigue significantly reduced running distance in the Yo-Yo IR1 (P < 0.001). No difference in heart rate existed between conditions, whereas ratings of perceived exertion were significantly higher at iso-time in the mental fatigue condition (P < 0.01). LSPT original time and performance time were not different between conditions; however, penalty time significantly increased in the mental fatigue condition (P = 0.015). Mental fatigue also impaired shot speed (P = 0.024) and accuracy (P < 0.01), whereas shot sequence time was similar between conditions. Mental fatigue impairs soccer-specific running, passing, and shooting performance.

  4. Temporal Changes in Technical and Physical Performances During a Small-Sided Game in Elite Youth Soccer Players

    PubMed Central

    Moreira, Alexandre; Saldanha Aoki, Marcelo; Carling, Chris; Alan Rodrigues Lopes, Rafael; Felipe Schultz de Arruda, Ademir; Lima, Marcelo; Cesar Correa, Umberto; Bradley, Paul S

    2016-01-01

    Background There have been claims that small-sided games (SSG) may generate an appropriate environment to develop youth players’ technical performance associated to game-related problem solving. However, the temporal change in technical performance parameters of youth players during SSG is still unknown. Objectives The aim of this study was to examine temporal changes in technical and physical performances during a small-sided game (SSG) in elite soccer players. Methods Sixty elite youth players (age 14.8 ± 0.2 yr; stature 177 ± 5 cm; body mass 66.2 ± 4.7 kg) completed a 5 v 5 SSG using two repetitions of 8 minutes interspersed by 3 minutes of passive recovery. To evaluate temporal changes in performance, the data were analysed across 4 minutes quarters. Physical performance parameters included the total distance covered (TDC), the frequency of sprints (>18 km•h-1), accelerations and decelerations (> 2.0 m•s-2 and - 2.0 m•s-2), metabolic power (W•kg-1), training impulse (TRIMP), TDC: TRIMP, number of impacts, and body load. Technical performance parameters included goal attempts, total number of tackles, tackles and interceptions, total number of passes, and passes effectiveness. Results All physical performance parameters decreased from the first to the last quarter with notable declines in TDC, metabolic power and the frequency of sprints, accelerations and decelerations (P < 0.05; moderate to very large ES: 1.08 - 3.30). However, technical performance parameters did not vary across quarters (P > 0.05; trivial ES for 1st v 4th quarters: 0.15 - 0.33). Conclusions The data demonstrate that technical performance is maintained despite substantial declines in physical performance during a SSG in elite youth players. This finding may have implications for designing SSG’s for elite youth players to ensure physical, technical and tactical capabilities are optimized. Modifications in player number, pitch dimensions, rules, coach encouragement, for instance

  5. Temporal Changes in Technical and Physical Performances During a Small-Sided Game in Elite Youth Soccer Players.

    PubMed

    Moreira, Alexandre; Saldanha Aoki, Marcelo; Carling, Chris; Alan Rodrigues Lopes, Rafael; Felipe Schultz de Arruda, Ademir; Lima, Marcelo; Cesar Correa, Umberto; Bradley, Paul S

    2016-12-01

    There have been claims that small-sided games (SSG) may generate an appropriate environment to develop youth players' technical performance associated to game-related problem solving. However, the temporal change in technical performance parameters of youth players during SSG is still unknown. The aim of this study was to examine temporal changes in technical and physical performances during a small-sided game (SSG) in elite soccer players. Sixty elite youth players (age 14.8 ± 0.2 yr; stature 177 ± 5 cm; body mass 66.2 ± 4.7 kg) completed a 5 v 5 SSG using two repetitions of 8 minutes interspersed by 3 minutes of passive recovery. To evaluate temporal changes in performance, the data were analysed across 4 minutes quarters. Physical performance parameters included the total distance covered (TDC), the frequency of sprints (>18 km•h -1 ), accelerations and decelerations (> 2.0 m•s -2 and - 2.0 m•s -2 ), metabolic power (W•kg -1 ), training impulse (TRIMP), TDC: TRIMP, number of impacts, and body load. Technical performance parameters included goal attempts, total number of tackles, tackles and interceptions, total number of passes, and passes effectiveness. All physical performance parameters decreased from the first to the last quarter with notable declines in TDC, metabolic power and the frequency of sprints, accelerations and decelerations (P < 0.05; moderate to very large ES: 1.08 - 3.30). However, technical performance parameters did not vary across quarters (P > 0.05; trivial ES for 1st v 4th quarters: 0.15 - 0.33). The data demonstrate that technical performance is maintained despite substantial declines in physical performance during a SSG in elite youth players. This finding may have implications for designing SSG's for elite youth players to ensure physical, technical and tactical capabilities are optimized. Modifications in player number, pitch dimensions, rules, coach encouragement, for instance, should be included taking into account the

  6. Not just trust: factors influencing learners' attempts to perform technical skills on real patients.

    PubMed

    Bannister, Susan L; Dolson, Mark S; Lingard, Lorelei; Keegan, David A

    2018-06-01

    As part of their training, physicians are required to learn how to perform technical skills on patients. The previous literature reveals that this learning is complex and that many opportunities to perform these skills are not converted into attempts to do so by learners. This study sought to explore and understand this phenomenon better. A multi-phased qualitative study including ethnographic observations, interviews and focus groups was conducted to explore the factors that influence technical skill learning. In a tertiary paediatric emergency department, staff physician preceptors, residents, nurses and respiratory therapists were observed in the delivery and teaching of technical skills over a 3-month period. A constant comparison methodology was used to analyse the data and to develop a constructivist grounded theory. We conducted 419 hours of observation, 18 interviews and four focus groups. We observed 287 instances of technical skills, of which 27.5% were attempted by residents. Thematic analysis identified 14 factors, grouped into three categories, which influenced whether residents attempted technical skills on real patients. Learner factors included resident initiative, perceived need for skill acquisition and competing priorities. Teacher factors consisted of competing priorities, interest in teaching, perceived need for residents to acquire skills, attributions about learners, assessments of competency, and trust. Environmental factors were competition from other learners, judgement that the patient was appropriate, buy-in from team members, consent from patient or caregivers, and physical environment constraints. Our findings suggest that neither the presence of a learner in a clinical environment nor the trust of the supervisor is sufficient to ensure the learner will attempt a technical skill. We characterise this phenomenon as representing a pool of opportunities to conduct technical skills on live patients that shrinks to a much smaller pool of

  7. Analysis of sequencing and scheduling methods for arrival traffic

    NASA Technical Reports Server (NTRS)

    Neuman, Frank; Erzberger, Heinz

    1990-01-01

    The air traffic control subsystem that performs scheduling is discussed. The function of the scheduling algorithms is to plan automatically the most efficient landing order and to assign optimally spaced landing times to all arrivals. Several important scheduling algorithms are described and the statistical performance of the scheduling algorithms is examined. Scheduling brings order to an arrival sequence for aircraft. First-come-first-served scheduling (FCFS) establishes a fair order, based on estimated times of arrival, and determines proper separations. Because of the randomness of the traffic, gaps will remain in the scheduled sequence of aircraft. These gaps are filled, or partially filled, by time-advancing the leading aircraft after a gap while still preserving the FCFS order. Tightly scheduled groups of aircraft remain with a mix of heavy and large aircraft. Separation requirements differ for different types of aircraft trailing each other. Advantage is taken of this fact through mild reordering of the traffic, thus shortening the groups and reducing average delays. Actual delays for different samples with the same statistical parameters vary widely, especially for heavy traffic.

  8. Toward an Autonomous Telescope Network: the TBT Scheduler

    NASA Astrophysics Data System (ADS)

    Racero, E.; Ibarra, A.; Ocaña, F.; de Lis, S. B.; Ponz, J. D.; Castillo, M.; Sánchez-Portal, M.

    2015-09-01

    Within the ESA SSA program, it is foreseen to deploy several robotic telescopes to provide surveillance and tracking services for hazardous objects. The TBT project will procure a validation platform for an autonomous optical observing system in a realistic scenario, consisting of two telescopes located in Spain and Australia, to collect representative test data for precursor SSA services. In this context, the planning and scheduling of the night consists of two software modules, the TBT Scheduler, that will allow the manual and autonomous planning of the night, and the control of the real-time response of the system, done by the RTS2 internal scheduler. The TBT Scheduler allocates tasks for both telescopes without human intervention. Every night it takes all the inputs needed and prepares the schedule following some predefined rules. The main purpose of the scheduler is the distribution of the time for follow-up of recently discovered targets and surveys. The TBT Scheduler considers the overall performance of the system, and combine follow-up with a priori survey strategies for both kind of objects. The strategy is defined according to the expected combined performance for both systems the upcoming night (weather, sky brightness, object accessibility and priority). Therefore, TBT Scheduler defines the global approach for the network and relies on the RTS2 internal scheduler for the final detailed distribution of tasks at each sensor.

  9. Diverse task scheduling for individualized requirements in cloud manufacturing

    NASA Astrophysics Data System (ADS)

    Zhou, Longfei; Zhang, Lin; Zhao, Chun; Laili, Yuanjun; Xu, Lida

    2018-03-01

    Cloud manufacturing (CMfg) has emerged as a new manufacturing paradigm that provides ubiquitous, on-demand manufacturing services to customers through network and CMfg platforms. In CMfg system, task scheduling as an important means of finding suitable services for specific manufacturing tasks plays a key role in enhancing the system performance. Customers' requirements in CMfg are highly individualized, which leads to diverse manufacturing tasks in terms of execution flows and users' preferences. We focus on diverse manufacturing tasks and aim to address their scheduling issue in CMfg. First of all, a mathematical model of task scheduling is built based on analysis of the scheduling process in CMfg. To solve this scheduling problem, we propose a scheduling method aiming for diverse tasks, which enables each service demander to obtain desired manufacturing services. The candidate service sets are generated according to subtask directed graphs. An improved genetic algorithm is applied to searching for optimal task scheduling solutions. The effectiveness of the scheduling method proposed is verified by a case study with individualized customers' requirements. The results indicate that the proposed task scheduling method is able to achieve better performance than some usual algorithms such as simulated annealing and pattern search.

  10. A space station onboard scheduling assistant

    NASA Technical Reports Server (NTRS)

    Brindle, A. F.; Anderson, B. H.

    1988-01-01

    One of the goals for the Space Station is to achieve greater autonomy, and have less reliance on ground commanding than previous space missions. This means that the crew will have to take an active role in scheduling and rescheduling their activities onboard, perhaps working from preliminary schedules generated on the ground. Scheduling is a time intensive task, whether performed manually or automatically, so the best approach to solving onboard scheduling problems may involve crew members working with an interactive software scheduling package. A project is described which investigates a system that uses knowledge based techniques for the rescheduling of experiments within the Materials Technology Laboratory of the Space Station. Particular attention is paid to: (1) methods for rapid response rescheduling to accommodate unplanned changes in resource availability, (2) the nature of the interface to the crew, (3) the representation of the many types of data within the knowledge base, and (4) the possibility of applying rule-based and constraint-based reasoning methods to onboard activity scheduling.

  11. Writing Performance Goals: Strategy and Prototypes. A Manual for Vocational and Technical Educators.

    ERIC Educational Resources Information Center

    McGraw-Hill Book Co., New York, NY. Gregg Div.

    The result of a cooperative project of the Center for Vocational and Technical Education at the Ohio State University and the McGraw-Hill Book Company, this manual was prepared to develop prototypes of performance goals for use by curriculum specialists and developers of instructional materials in vocational and technical education and to provide…

  12. Quantifying Scheduling Challenges for Exascale System Software

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mondragon, Oscar; Bridges, Patrick G.; Jones, Terry R

    2015-01-01

    The move towards high-performance computing (HPC) ap- plications comprised of coupled codes and the need to dra- matically reduce data movement is leading to a reexami- nation of time-sharing vs. space-sharing in HPC systems. In this paper, we discuss and begin to quantify the perfor- mance impact of a move away from strict space-sharing of nodes for HPC applications. Specifically, we examine the po- tential performance cost of time-sharing nodes between ap- plication components, we determine whether a simple coor- dinated scheduling mechanism can address these problems, and we research how suitable simple constraint-based opti- mization techniques are for solvingmore » scheduling challenges in this regime. Our results demonstrate that current general- purpose HPC system software scheduling and resource al- location systems are subject to significant performance de- ciencies which we quantify for six representative applica- tions. Based on these results, we discuss areas in which ad- ditional research is needed to meet the scheduling challenges of next-generation HPC systems.« less

  13. Plant operation planning and scheduling

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jammar, R.J.

    When properly designed, planning and scheduling can actually add millions of dollars per year to the bottom line. Planning and scheduling is a continuum of decisions starting with crude selection and ending with establishing short-term targets for crude processing and blending. It also includes maintaining optimization and operation simulation models. It is thought that conservatively, a refinery may save from $5 million to $10 million a year if it pays more attention to the processes behind proper planning and scheduling. Of course, the amount of savings can reach staggering proportions for companies now at the bottom of the Solomon Associatesmore » Inc. refinery performance ranking.« less

  14. Balancing Authority Cooperation Concepts - Intra-Hour Scheduling

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hunsaker, Matthew; Samaan, Nader; Milligan, Michael

    2013-03-29

    The overall objective of this study was to understand, on an Interconnection-wide basis, the effects intra-hour scheduling compared to hourly scheduling. Moreover, the study sought to understand how the benefits of intra-hour scheduling would change by altering the input assumptions in different scenarios. This report describes results of three separate scenarios with differing key assumptions and comparing the production costs between hourly scheduling and 10-minute scheduling performance. The different scenarios were chosen to provide insight into how the estimated benefits might change by altering input assumptions. Several key assumptions were different in the three scenarios, however most assumptions were similarmore » and/or unchanged among the scenarios.« less

  15. The Relationship of Aptitudes to the Performance of Skilled Technical Jobs in Engine Manufacturing. Technical Report 1982-5 [and Supplement].

    ERIC Educational Resources Information Center

    Daniel, Mark; And Others

    A study examined the relationship of aptitudes to the performance of skilled technical jobs in engine manufacturing. During the study, several approaches were utilized, including criterion-referenced validation, taxonomic validation, construct validation, and detailed anlaysis of the behaviors involved in performing the jobs. The study sample…

  16. Designing a fuzzy scheduler for hard real-time systems

    NASA Technical Reports Server (NTRS)

    Yen, John; Lee, Jonathan; Pfluger, Nathan; Natarajan, Swami

    1992-01-01

    In hard real-time systems, tasks have to be performed not only correctly, but also in a timely fashion. If timing constraints are not met, there might be severe consequences. Task scheduling is the most important problem in designing a hard real-time system, because the scheduling algorithm ensures that tasks meet their deadlines. However, the inherent nature of uncertainty in dynamic hard real-time systems increases the problems inherent in scheduling. In an effort to alleviate these problems, we have developed a fuzzy scheduler to facilitate searching for a feasible schedule. A set of fuzzy rules are proposed to guide the search. The situation we are trying to address is the performance of the system when no feasible solution can be found, and therefore, certain tasks will not be executed. We wish to limit the number of important tasks that are not scheduled.

  17. 75 FR 13425 - Federal Acquisition Regulation; Technical Amendment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-19

    ... DEPARTMENT OF DEFENSE GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND SPACE ADMINISTRATION 48 CFR Part 14 [FAC 2005-39; Item VII; Docket FAR 2010-0078; Sequence 1] Federal Acquisition... publication schedules. Please cite FAC 2005-39, Technical Amendment. SUPPLEMENTARY INFORMATION: This document...

  18. Performance measurement: A tool for program control

    NASA Technical Reports Server (NTRS)

    Abell, Nancy

    1994-01-01

    Performance measurement is a management tool for planning, monitoring, and controlling as aspects of program and project management--cost, schedule, and technical requirements. It is a means (concept and approach) to a desired end (effective program planning and control). To reach the desired end, however, performance measurement must be applied and used appropriately, with full knowledge and recognition of its power and of its limitations--what it can and cannot do for the project manager. What is the potential of this management tool? What does performance measurement do that a traditional plan vs. actual technique cannot do? Performance measurement provides an improvement over the customary comparison of how much money was spent (actual cost) vs. how much was planned to be spent based on a schedule of activities (work planned). This commonly used plan vs. actual comparison does not allow one to know from the numerical data if the actual cost incurred was for work intended to be done.

  19. Histologic findings in protocol biopsies performed in stable renal allografts under different immunosuppressive schedules.

    PubMed

    Moreso, F; Alperovich, G; Fulladosa, X; Gil-Vernet, S; Ibernon, M; Carrera, M; Castelao, A M; Hueso, M; Grinyo, J M; Serón, D

    2003-08-01

    Protocol biopsies performed in stable renal allografts show different degrees of acute and chronic lesions. Histologic findings in protocol biopsies have been related to graft outcome. We evaluated histologic lesions observed in protocol biopsies performed in patients under different immunosuppression therapies. From June 1988 a protocol biopsy was performed at approximately 4 months in patients who fulfilled the following criteria: serum creatinine <300 micromol/L; stable renal function; and proteinuria <1 g/d. Histologic lesions were graded according to 1997 Banff criteria. For the present study we considered the following groups according to immunosuppressive schedule: (i) induction therapy with polyclonal or monoclonal antilymphocytic antibodies associated with cyclosporine and prednisone (n=201); (ii) cyclosporine, mycophenolate mofetil, and prednisone (n=127); and (iii) tacrolimus, mycophenolate mofetil, and prednisone (n=51). On protocol biopsy patients treated with tacrolimus displayed a lower acute score (0.61+/-1.01 vs 1.24+/-1.23 in group I, 1.28+/-1.41 in group II; P<.0001) and a higher proportion of normal biopsies (57.1% vs 41.9% in group I, 45.1% in group II; P=.016). A similar proportion of chronic lesions (chronic score of group I: 1.30+/-1.56; group II: 1.34+/-1.80; group III: 1.51+/-0.95; P=NS) was observed in the three groups. Protocol biopsies displayed fewer acute lesions in patients treated with tacrolimus. This result suggests that the efficacy of new immunosuppression schedules can be evaluated using the protocol biopsy as a surrogate marker of graft outcome.

  20. Transformational leadership, initiating structure, and substitutes for leadership: a longitudinal study of research and development project team performance.

    PubMed

    Keller, Robert T

    2006-01-01

    Transformational leadership, initiating structure, and selected substitutes for leadership were studied as longitudinal predictors of performance in 118 research and development (R&D) project teams from 5 firms. As hypothesized, transformational leadership predicted 1-year-later technical quality, schedule performance, and cost performance and 5-year-later profitability and speed to market. Initiating structure predicted all the performance measures. The substitutes of subordinate ability and an intrinsically satisfying task each predicted technical quality and profitability, and ability predicted speed to market. Moderator effects for type of R&D work were hypothesized and found whereby transformational leadership was a stronger predictor of technical quality in research projects, whereas initiating structure was a stronger predictor of technical quality in development projects. Implications for leadership theory and research are discussed. (c) 2006 APA, all rights reserved.

  1. Fatigue Risk Management: The Impact of Anesthesiology Residents' Work Schedules on Job Performance and a Review of Potential Countermeasures.

    PubMed

    Wong, Lily R; Flynn-Evans, Erin; Ruskin, Keith J

    2018-04-01

    Long duty periods and overnight call shifts impair physicians' performance on measures of vigilance, psychomotor functioning, alertness, and mood. Anesthesiology residents typically work between 64 and 70 hours per week and are often required to work 24 hours or overnight shifts, sometimes taking call every third night. Mitigating the effects of sleep loss, circadian misalignment, and sleep inertia requires an understanding of the relationship among work schedules, fatigue, and job performance. This article reviews the current Accreditation Council for Graduate Medical Education guidelines for resident duty hours, examines how anesthesiologists' work schedules can affect job performance, and discusses the ramifications of overnight and prolonged duty hours on patient safety and resident well-being. We then propose countermeasures that have been implemented to mitigate the effects of fatigue and describe how training programs or practice groups who must work overnight can adapt these strategies for use in a hospital setting. Countermeasures include the use of scheduling interventions, strategic naps, microbreaks, caffeine use during overnight and extended shifts, and the use of bright lights in the clinical setting when possible or personal blue light devices when the room lights must be turned off. Although this review focuses primarily on anesthesiology residents in training, many of the mitigation strategies described here can be used effectively by physicians in practice.

  2. Environmental Management Performance Report June 2000

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    EDER, D.M.

    2000-06-01

    The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL) a monthly summary of the Project Hanford Management Contractor's (PHMC) Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. In addition to project-specific information, it includes some PHMC-level data not detailed elsewhere in the report. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities asmore » extracted from the PHMC baseline. The remaining sections provide detailed performance data relative to each individual Project (e.g., Waste Management, Spent Nuclear Fuels, etc.), in support of Section A of the report. Unless otherwise noted, the Safety, Conduct of Operations, and Cost/Schedule data contained herein is as of April 30, 2000. All other information is updated as of May 19, unless otherwise noted.« less

  3. Advanced transportation system studies technical area 3: Alternate propulsion subsystem concepts, volume 3

    NASA Technical Reports Server (NTRS)

    Levak, Daniel

    1993-01-01

    The objective of this contract was to provide definition of alternate propulsion systems for both earth-to-orbit (ETO) and in-space vehicles (upper stages and space transfer vehicles). For such propulsion systems, technical data to describe performance, weight, dimensions, etc. was provided along with programmatic information such as cost, schedule, needed facilities, etc. Advanced technology and advanced development needs were determined and provided. This volume separately presents the various program cost estimates that were generated under three tasks: the F-1A Restart Task, the J-2S Restart Task, and the SSME Upper Stage Use Task. The conclusions, technical results, and the program cost estimates are described in more detail in Volume 1 - Executive Summary and in individual Final Task Reports.

  4. On program restructuring, scheduling, and communication for parallel processor systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Polychronopoulos, Constantine D.

    1986-08-01

    This dissertation discusses several software and hardware aspects of program execution on large-scale, high-performance parallel processor systems. The issues covered are program restructuring, partitioning, scheduling and interprocessor communication, synchronization, and hardware design issues of specialized units. All this work was performed focusing on a single goal: to maximize program speedup, or equivalently, to minimize parallel execution time. Parafrase, a Fortran restructuring compiler was used to transform programs in a parallel form and conduct experiments. Two new program restructuring techniques are presented, loop coalescing and subscript blocking. Compile-time and run-time scheduling schemes are covered extensively. Depending on the program construct, thesemore » algorithms generate optimal or near-optimal schedules. For the case of arbitrarily nested hybrid loops, two optimal scheduling algorithms for dynamic and static scheduling are presented. Simulation results are given for a new dynamic scheduling algorithm. The performance of this algorithm is compared to that of self-scheduling. Techniques for program partitioning and minimization of interprocessor communication for idealized program models and for real Fortran programs are also discussed. The close relationship between scheduling, interprocessor communication, and synchronization becomes apparent at several points in this work. Finally, the impact of various types of overhead on program speedup and experimental results are presented.« less

  5. Incremental Scheduling Engines: Cost Savings through Automation

    NASA Technical Reports Server (NTRS)

    Jaap, John; Phillips, Shaun

    2005-01-01

    As humankind embarks on longer space missions farther from home, the requirements and environments for scheduling the activities performed on these missions are changing. As we begin to prepare for these missions it is appropriate to evaluate the merits and applicability of the different types of scheduling engines. Scheduling engines temporally arrange tasks onto a timeline so that all constraints and ob.jectives are met and resources are not over-booked. Scheduling engines used to schedule space missions fall into three general categories: batch, mixed-initiative, and incremental. This paper, presents an assessment of the engine types, a discussion of the impact of human exploration of the moon and Mars on planning and scheduling, and the applicability of the different types of scheduling engines. This paper will pursue the hypothesis that incremental scheduling engines may have a place in the new environment; they have the potential to reduce cost, to improve the satisfaction of those who execute or benefit from a particular timeline (the customers), and to allow astronauts to plan their own tasks and those of their companion robots.

  6. SMART operational field test evaluation : schedule adherence report : final report

    DOT National Transportation Integrated Search

    1997-06-01

    Among the paratransit (termed Community Transit within SMART) performance indicators likely to be affected by SMARTs implementation of automated scheduling and dispatch (ASD) is schedule adherence. Schedule adherence refers to a variety of measure...

  7. Technology for planning and scheduling under complex constraints

    NASA Astrophysics Data System (ADS)

    Alguire, Karen M.; Pedro Gomes, Carla O.

    1997-02-01

    Within the context of law enforcement, several problems fall into the category of planning and scheduling under constraints. Examples include resource and personnel scheduling, and court scheduling. In the case of court scheduling, a schedule must be generated considering available resources, e.g., court rooms and personnel. Additionally, there are constraints on individual court cases, e.g., temporal and spatial, and between different cases, e.g., precedence. Finally, there are overall objectives that the schedule should satisfy such as timely processing of cases and optimal use of court facilities. Manually generating a schedule that satisfies all of the constraints is a very time consuming task. As the number of court cases and constraints increases, this becomes increasingly harder to handle without the assistance of automatic scheduling techniques. This paper describes artificial intelligence (AI) technology that has been used to develop several high performance scheduling applications including a military transportation scheduler, a military in-theater airlift scheduler, and a nuclear power plant outage scheduler. We discuss possible law enforcement applications where we feel the same technology could provide long-term benefits to law enforcement agencies and their operations personnel.

  8. Effectiveness of Instruction Performed through Computer-Assisted Activity Schedules on On-Schedule and Role-Play Skills of Children with Autism Spectrum Disorder

    ERIC Educational Resources Information Center

    Ulke-Kurkcuoglu, Burcu; Bozkurt, Funda; Cuhadar, Selmin

    2015-01-01

    This study aims to investigate the effectiveness of the instruction process provided through computer-assisted activity schedules in the instruction of on-schedule and role-play skills to children with autism spectrum disorder. Herein, a multiple probe design with probe conditions across participants among single subject designs was used. Four…

  9. Scheduling multicore workload on shared multipurpose clusters

    NASA Astrophysics Data System (ADS)

    Templon, J. A.; Acosta-Silva, C.; Flix Molina, J.; Forti, A. C.; Pérez-Calero Yzquierdo, A.; Starink, R.

    2015-12-01

    With the advent of workloads containing explicit requests for multiple cores in a single grid job, grid sites faced a new set of challenges in workload scheduling. The most common batch schedulers deployed at HEP computing sites do a poor job at multicore scheduling when using only the native capabilities of those schedulers. This paper describes how efficient multicore scheduling was achieved at the sites the authors represent, by implementing dynamically-sized multicore partitions via a minimalistic addition to the Torque/Maui batch system already in use at those sites. The paper further includes example results from use of the system in production, as well as measurements on the dependence of performance (especially the ramp-up in throughput for multicore jobs) on node size and job size.

  10. 77 FR 12948 - Federal Acquisition Regulation; Technical Amendments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-02

    ... DEPARTMENT OF DEFENSE GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND SPACE ADMINISTRATION 48 CFR Parts 19, 42, and 52 [FAC 2005-56; Item VIII; Docket 2012-0079; Sequence 1] Federal... to status or publication schedules. Please cite FAC 2005-56, Technical Amendments. SUPPLEMENTARY...

  11. Learning to improve iterative repair scheduling

    NASA Technical Reports Server (NTRS)

    Zweben, Monte; Davis, Eugene

    1992-01-01

    This paper presents a general learning method for dynamically selecting between repair heuristics in an iterative repair scheduling system. The system employs a version of explanation-based learning called Plausible Explanation-Based Learning (PEBL) that uses multiple examples to confirm conjectured explanations. The basic approach is to conjecture contradictions between a heuristic and statistics that measure the quality of the heuristic. When these contradictions are confirmed, a different heuristic is selected. To motivate the utility of this approach we present an empirical evaluation of the performance of a scheduling system with respect to two different repair strategies. We show that the scheduler that learns to choose between the heuristics outperforms the same scheduler with any one of two heuristics alone.

  12. Effect of streptozotocin-induced diabetes on performance on a progressive ratio schedule.

    PubMed

    Valencia-Torres, Lourdes; Bradshaw, C M; Bouzas, Arturo; Hong, Enrique; Orduña, Vladimir

    2014-06-01

    It has been suggested that streptozotocin (STZ)-induced diabetes causes a motivational deficit in rodents. However, some of the evidence adduced in support of this suggestion may be interpreted in terms of a motor impairment rather than a motivational deficit. This experiment examined the effect of STZ-induced diabetes on performance on a progressive ratio schedule. The data were analysed using a new model derived from Killeen's (Behav Brain Sci 17:105-172, 1994) Mathematical Principles of Reinforcement model which enables the effects of interventions on motivation or incentive value to be separated from effects on motor function. Animals were trained under a progressive ratio schedule using food-pellet reinforcement. Then they received a single intraperitoneal injection of 50 mg/kg of STZ or the vehicle. Training continued for 30 sessions after treatment. Running and overall response rates in successive ratios were analysed using the new model, and estimates of the model's parameters were compared between groups. The parameter expressing incentive value was reduced in the group treated with STZ, whereas the parameters expressing motor capacity and post-reinforcement pausing were not affected by the treatment. Blood glucose concentration was significantly elevated in the STZ-treated group compared to the vehicle-treated group. The results are consistent with the suggestion that STZ-induced diabetes is associated with a reduction of the incentive value of food.

  13. Advancing Air Force Scheduling through Modeling Problem Topologies

    DTIC Science & Technology

    2006-08-03

    Merrill on August 23, 2005 and corresponded with Major David Van Veldhuizen in Fall 2005 about obtaining data. 3.4.3 Transitions Analytical Graphics and...observation satellite orbit. Technical Report CRT-2003-27, Centre de recherche sur les transports, July 2003. [5] Van -Dat Cung. ROADEF 2003: Results of the...collaborateurs/etd/default.htm. January, 2004. [15] P.J.M van Laarhoven, E.H.L. Aarts, and J.K. Lenstra. Job shop scheduling by simulated annealing

  14. Optimal radiotherapy dose schedules under parametric uncertainty

    NASA Astrophysics Data System (ADS)

    Badri, Hamidreza; Watanabe, Yoichi; Leder, Kevin

    2016-01-01

    We consider the effects of parameter uncertainty on the optimal radiation schedule in the context of the linear-quadratic model. Our interest arises from the observation that if inter-patient variability in normal and tumor tissue radiosensitivity or sparing factor of the organs-at-risk (OAR) are not accounted for during radiation scheduling, the performance of the therapy may be strongly degraded or the OAR may receive a substantially larger dose than the allowable threshold. This paper proposes a stochastic radiation scheduling concept to incorporate inter-patient variability into the scheduling optimization problem. Our method is based on a probabilistic approach, where the model parameters are given by a set of random variables. Our probabilistic formulation ensures that our constraints are satisfied with a given probability, and that our objective function achieves a desired level with a stated probability. We used a variable transformation to reduce the resulting optimization problem to two dimensions. We showed that the optimal solution lies on the boundary of the feasible region and we implemented a branch and bound algorithm to find the global optimal solution. We demonstrated how the configuration of optimal schedules in the presence of uncertainty compares to optimal schedules in the absence of uncertainty (conventional schedule). We observed that in order to protect against the possibility of the model parameters falling into a region where the conventional schedule is no longer feasible, it is required to avoid extremal solutions, i.e. a single large dose or very large total dose delivered over a long period. Finally, we performed numerical experiments in the setting of head and neck tumors including several normal tissues to reveal the effect of parameter uncertainty on optimal schedules and to evaluate the sensitivity of the solutions to the choice of key model parameters.

  15. Affirmative Action: The Scheduled Castes and the Scheduled Tribes.

    ERIC Educational Resources Information Center

    Sivaramayya, B.

    This paper considers Indian affirmative action policies that provide reservations (quotas) in favor of two disadvantaged groups, the scheduled castes and the scheduled tribes. First, definitions and background are presented. The scheduled castes ("untouchables") are said to suffer from social segregation, and the scheduled tribes from…

  16. 75 FR 42831 - Proposed Collection; Comment Request for Form 1065, Schedule C, Schedule D, Schedule K-1...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-22

    ... Income, Credits, Deductions and Other Items), Schedule L (Balance Sheets per Books), Schedule M-1..., Deductions, etc. (Schedule K-1), Balance Sheets per Books (Schedule L), Reconciliation of Income (Loss) per...

  17. Edwin I. Hatch nuclear plant implementation of improved technical specifications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mahler, S.R.; Pendry, D.

    1994-12-31

    Edwin I. Hatch nuclear plant consists of two General Electric boiling water reactor/4 units, with a common control room and a common refueling floor. In March 1993, Hatch began conversion of both units` technical specifications utilizing NUREG 1433. The technical specifications amendment request was submitted February 25, 1994. Issuance is scheduled for October 21, 1994, with implementation on March 15, 1994. The current unit-1 technical specifications are in the {open_quotes}custom{close_quotes} format, and the unit-2 technical specifications are in the old standard format. Hatch previously relocated the fire protection and radiological technical specifications requirements. The Hatch conversion will provide consistency betweenmore » the two units, to the extent practicable.« less

  18. Automation Improves Schedule Quality and Increases Scheduling Efficiency for Residents.

    PubMed

    Perelstein, Elizabeth; Rose, Ariella; Hong, Young-Chae; Cohn, Amy; Long, Micah T

    2016-02-01

    Medical resident scheduling is difficult due to multiple rules, competing educational goals, and ever-evolving graduate medical education requirements. Despite this, schedules are typically created manually, consuming hours of work, producing schedules of varying quality, and yielding negative consequences for resident morale and learning. To determine whether computerized decision support can improve the construction of residency schedules, saving time and improving schedule quality. The Optimized Residency Scheduling Assistant was designed by a team from the University of Michigan Department of Industrial and Operations Engineering. It was implemented in the C.S. Mott Children's Hospital Pediatric Emergency Department in the 2012-2013 academic year. The 4 metrics of schedule quality that were compared between the 2010-2011 and 2012-2013 academic years were the incidence of challenging shift transitions, the incidence of shifts following continuity clinics, the total shift inequity, and the night shift inequity. All scheduling rules were successfully incorporated. Average schedule creation time fell from 22 to 28 hours to 4 to 6 hours per month, and 3 of 4 metrics of schedule quality significantly improved. For the implementation year, the incidence of challenging shift transitions decreased from 83 to 14 (P < .01); the incidence of postclinic shifts decreased from 72 to 32 (P < .01); and the SD of night shifts dropped by 55.6% (P < .01). This automated shift scheduling system improves the current manual scheduling process, reducing time spent and improving schedule quality. Embracing such automated tools can benefit residency programs with shift-based scheduling needs.

  19. Decentralized Control of Scheduling in Distributed Systems.

    DTIC Science & Technology

    1983-12-15

    does not perform quite as well as the 10 state system, but is less sensitive to changes in scheduling period. It performs best when scheduling is...intra-process concerns. We extend theLr concept of a process to inolude Inter -ress comunication. That is. various form of send and receive primitives...Current busyness of each site based on some responses to requests for bids. A received bid is utilization factor. adjusted by incrementing it by a

  20. INDOT Technical Training Plan : [Technical Summary

    DOT National Transportation Integrated Search

    2012-01-01

    A wide range of job classifications, increasing technical : performance expectations, licensing and certification requirements, : budget restrictions and frequent department : reorganization has made technical training of employees : more difficult, ...

  1. Home Health Care for California's Injured Workers: Options for Implementing a Fee Schedule.

    PubMed

    Wynn, Barbara O; Boustead, Anne

    2015-07-15

    The California Department of Industrial Relations/Division of Worker's Compensation asked RAND to provide technical assistance in developing a fee schedule for home health services provided to injured workers. The fee schedule needs to address the full spectrum of home health services ranging from skilled nursing and therapy services to unskilled personal care or chore services that may be provided by family members. RAND researchers consulted with stakeholders in the California workers' compensation system to outline issues the fee schedule should address, reviewed home health fee schedules used by other payers, and conducted interviews with WC administrators from other jurisdictions to elicit their experiences. California stakeholders identified unskilled attendant services as most problematic in determining need and payment rates, particularly services furnished by family members. RAND researchers concentrated on fee schedule options that would result in a single fee schedule covering the full range of home health care services furnished to injured workers and made three sets of recommendations. The first set pertains to obtaining additional information that would highlight the policy issues likely to occur with the implementation of the fee schedule and alternatives for assessing an injured worker's home health care needs. Another approach conforms most closely with the Labor Code requirements. It would integrate the fee schedules used by Medicare, In-Home Health Supportive Services, and the federal Office of Workers' Compensation. The third approach would base the home health fee schedule on rules used by the federal Office of Workers' Compensation.

  2. Long range science scheduling for the Hubble Space Telescope

    NASA Technical Reports Server (NTRS)

    Miller, Glenn; Johnston, Mark

    1991-01-01

    Observations with NASA's Hubble Space Telescope (HST) are scheduled with the assistance of a long-range scheduling system (SPIKE) that was developed using artificial intelligence techniques. In earlier papers, the system architecture and the constraint representation and propagation mechanisms were described. The development of high-level automated scheduling tools, including tools based on constraint satisfaction techniques and neural networks is described. The performance of these tools in scheduling HST observations is discussed.

  3. Taking the Lag out of Jet Lag through Model-Based Schedule Design

    PubMed Central

    Dean, Dennis A.; Forger, Daniel B.; Klerman, Elizabeth B.

    2009-01-01

    Travel across multiple time zones results in desynchronization of environmental time cues and the sleep–wake schedule from their normal phase relationships with the endogenous circadian system. Circadian misalignment can result in poor neurobehavioral performance, decreased sleep efficiency, and inappropriately timed physiological signals including gastrointestinal activity and hormone release. Frequent and repeated transmeridian travel is associated with long-term cognitive deficits, and rodents experimentally exposed to repeated schedule shifts have increased death rates. One approach to reduce the short-term circadian, sleep–wake, and performance problems is to use mathematical models of the circadian pacemaker to design countermeasures that rapidly shift the circadian pacemaker to align with the new schedule. In this paper, the use of mathematical models to design sleep–wake and countermeasure schedules for improved performance is demonstrated. We present an approach to designing interventions that combines an algorithm for optimal placement of countermeasures with a novel mode of schedule representation. With these methods, rapid circadian resynchrony and the resulting improvement in neurobehavioral performance can be quickly achieved even after moderate to large shifts in the sleep–wake schedule. The key schedule design inputs are endogenous circadian period length, desired sleep–wake schedule, length of intervention, background light level, and countermeasure strength. The new schedule representation facilitates schedule design, simulation studies, and experiment design and significantly decreases the amount of time to design an appropriate intervention. The method presented in this paper has direct implications for designing jet lag, shift-work, and non-24-hour schedules, including scheduling for extreme environments, such as in space, undersea, or in polar regions. PMID:19543382

  4. Dosing Schedules for Pneumococcal Conjugate Vaccine

    PubMed Central

    2014-01-01

    Since second generation pneumococcal conjugate vaccines (PCVs) targeting 10 and 13 serotypes became available in 2010, the number of national policy makers considering these vaccines has steadily increased. An important consideration for a national immunization program is the timing and number of doses—the schedule—that will best prevent disease in the population. Data on disease epidemiology and the efficacy or effectiveness of PCV schedules are typically considered when choosing a schedule. Practical concerns, such as the existing vaccine schedule, and vaccine program performance are also important. In low-income countries, pneumococcal disease and deaths typically peak well before the end of the first year of life, making a schedule that provides PCV doses early in life (eg, a 6-, 10- and 14-week schedule) potentially the best option. In other settings, a schedule including a booster dose may address disease that peaks in the second year of life or may be seen to enhance a schedule already in place. A large and growing body of evidence from immunogenicity studies, as well as clinical trials and observational studies of carriage, pneumonia and invasive disease, has been systematically reviewed; these data indicate that schedules of 3 or 4 doses all work well, and that the differences between these regimens are subtle, especially in a mature program in which coverage is high and indirect (herd) effects help enhance protection provided directly by a vaccine schedule. The recent World Health Organization policy statement on PCVs endorsed a schedule of 3 primary doses without a booster or, as a new alternative, 2 primary doses with a booster dose. While 1 schedule may be preferred in a particular setting based on local epidemiology or practical considerations, achieving high coverage with 3 doses is likely more important than the specific timing of doses. PMID:24336059

  5. Analysis and design of gain scheduled control systems. Ph.D. Thesis

    NASA Technical Reports Server (NTRS)

    Shamma, Jeff S.

    1988-01-01

    Gain scheduling, as an idea, is to construct a global feedback control system for a time varying and/or nonlinear plant from a collection of local time invariant designs. However in the absence of a sound analysis, these designs come with no guarantees on the robustness, performance, or even nominal stability of the overall gain schedule design. Such an analysis is presented for three types of gain scheduling situations: (1) a linear parameter varying plant scheduling on its exogenous parameters, (2) a nonlinear plant scheduling on a prescribed reference trajectory, and (3) a nonlinear plant scheduling on the current plant output. Conditions are given which guarantee that the stability, robustness, and performance properties of the fixed operating point designs carry over to the global gain scheduled designs, such as the scheduling variable should vary slowly and capture the plants nonlinearities. Finally, an alternate design framework is proposed which removes the slowing varying restriction or gain scheduled systems. This framework addresses some fundamental feedback issues previously ignored in standard gain.

  6. Construction schedules slack time minimizing

    NASA Astrophysics Data System (ADS)

    Krzemiński, Michał

    2017-07-01

    The article presents two copyright models for minimizing downtime working brigades. Models have been developed for construction schedules performed using the method of work uniform. Application of flow shop models is possible and useful for the implementation of large objects, which can be divided into plots. The article also presents a condition describing gives which model should be used, as well as a brief example of optimization schedule. The optimization results confirm the legitimacy of the work on the newly-developed models.

  7. High Performance Asynchronous Limited Sensing Algorithms for CSMA and CSMA-CD Channels.

    DTIC Science & Technology

    1985-03-01

    for CSM and CSMA-CD Channels" M. Geargiopoulos L. Merakos P. Papantoni-Kazakos- Technical Report UCT/ DEECS /TR-85-2 Mrh1985 iDISTRIBUTION STAEmEN 2j C...Perforance Asynchronous Limited Sensing Algoit~5 forCSMAandCSMA-CD Channels" M1. Georgiop0 ul 0 5 L. Merakos P. PaPantoni-.Kazakos Technical Report UCT/ DEECS ...SCHEDULE unlimited. 4 PERFORMING ORGANiZATION REPORT NUMBERIS) 5. MONITORING ORGANIZATION REPORT NUMBERIS" UCT/ DEECS /TR-85-2 SR-TR. 85-0 398 6& NAME OF

  8. Dedicated heterogeneous node scheduling including backfill scheduling

    DOEpatents

    Wood, Robert R [Livermore, CA; Eckert, Philip D [Livermore, CA; Hommes, Gregg [Pleasanton, CA

    2006-07-25

    A method and system for job backfill scheduling dedicated heterogeneous nodes in a multi-node computing environment. Heterogeneous nodes are grouped into homogeneous node sub-pools. For each sub-pool, a free node schedule (FNS) is created so that the number of to chart the free nodes over time. For each prioritized job, using the FNS of sub-pools having nodes useable by a particular job, to determine the earliest time range (ETR) capable of running the job. Once determined for a particular job, scheduling the job to run in that ETR. If the ETR determined for a lower priority job (LPJ) has a start time earlier than a higher priority job (HPJ), then the LPJ is scheduled in that ETR if it would not disturb the anticipated start times of any HPJ previously scheduled for a future time. Thus, efficient utilization and throughput of such computing environments may be increased by utilizing resources otherwise remaining idle.

  9. Second-order schedules: comparison of different procedures for scheduling paired and nonpaired brief stimuli.

    PubMed

    Stubbs, D A; Cohen, S L

    1972-11-01

    Pigeons performed on a second-order schedule in which fixed-interval components were maintained under a variable-interval schedule. Completion of each fixed-interval component resulted in a brief-stimulus presentation and/or food. The relation of the brief stimulus and food was varied across conditions. Under some conditions, the brief stimulus was never paired with food. Under other conditions, the brief stimulus was paired with food; three different pairing procedures were used: (a) a response produced the simultaneous onset of the stimulus and food; (b) a response produced the stimulus before food with the stimulus remaining on during food presentation; (c) a response produced the stimulus and the offset of the stimulus was simultaneous with the onset of the food cycle. The various pairing and nonpairing operations all produced similar effects on performance. Under all conditions, response rates were positively accelerated within fixed-interval components. Total response rates and Index of Curvature measures were similar across conditions. In one condition, a blackout was paired with food; with this different stimulus in effect, less curvature resulted. The results suggest that pairing of a stimulus is not a necessary condition for within-component patterning under some second-order schedules.

  10. Assessing technical performance in differential gene expression experiments with external spike-in RNA control ratio mixtures.

    PubMed

    Munro, Sarah A; Lund, Steven P; Pine, P Scott; Binder, Hans; Clevert, Djork-Arné; Conesa, Ana; Dopazo, Joaquin; Fasold, Mario; Hochreiter, Sepp; Hong, Huixiao; Jafari, Nadereh; Kreil, David P; Łabaj, Paweł P; Li, Sheng; Liao, Yang; Lin, Simon M; Meehan, Joseph; Mason, Christopher E; Santoyo-Lopez, Javier; Setterquist, Robert A; Shi, Leming; Shi, Wei; Smyth, Gordon K; Stralis-Pavese, Nancy; Su, Zhenqiang; Tong, Weida; Wang, Charles; Wang, Jian; Xu, Joshua; Ye, Zhan; Yang, Yong; Yu, Ying; Salit, Marc

    2014-09-25

    There is a critical need for standard approaches to assess, report and compare the technical performance of genome-scale differential gene expression experiments. Here we assess technical performance with a proposed standard 'dashboard' of metrics derived from analysis of external spike-in RNA control ratio mixtures. These control ratio mixtures with defined abundance ratios enable assessment of diagnostic performance of differentially expressed transcript lists, limit of detection of ratio (LODR) estimates and expression ratio variability and measurement bias. The performance metrics suite is applicable to analysis of a typical experiment, and here we also apply these metrics to evaluate technical performance among laboratories. An interlaboratory study using identical samples shared among 12 laboratories with three different measurement processes demonstrates generally consistent diagnostic power across 11 laboratories. Ratio measurement variability and bias are also comparable among laboratories for the same measurement process. We observe different biases for measurement processes using different mRNA-enrichment protocols.

  11. Experiments with a decision-theoretic scheduler

    NASA Technical Reports Server (NTRS)

    Hansson, Othar; Holt, Gerhard; Mayer, Andrew

    1992-01-01

    This paper describes DTS, a decision-theoretic scheduler designed to employ state-of-the-art probabilistic inference technology to speed the search for efficient solutions to constraint-satisfaction problems. Our approach involves assessing the performance of heuristic control strategies that are normally hard-coded into scheduling systems, and using probabilistic inference to aggregate this information in light of features of a given problem. BPS, the Bayesian Problem-Solver, introduced a similar approach to solving single-agent and adversarial graph search problems, yielding orders-of-magnitude improvement over traditional techniques. Initial efforts suggest that similar improvements will be realizable when applied to typical constraint-satisfaction scheduling problems.

  12. FX-87 performance measurements: data-flow implementation. Technical report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hammel, R.T.; Gifford, D.K.

    1988-11-01

    This report documents a series of experiments performed to explore the thesis that the FX-87 effect system permits a compiler to schedule imperative programs (i.e., programs that may contain side-effects) for execution on a parallel computer. The authors analyze how much the FX-87 static effect system can improve the execution times of five benchmark programs on a parallel graph interpreter. Three of their benchmark programs do not use side-effects (factorial, fibonacci, and polynomial division) and thus did not have any effect-induced constraints. Their FX-87 performance was comparable to their performance in a purely functional language. Two of the benchmark programsmore » use side effects (DNA sequence matching and Scheme interpretation) and the compiler was able to use effect information to reduce their execution times by factors of 1.7 to 5.4 when compared with sequential execution times. These results support the thesis that a static effect system is a powerful tool for compilation to multiprocessor computers. However, the graph interpreter we used was based on unrealistic assumptions, and thus our results may not accurately reflect the performance of a practical FX-87 implementation. The results also suggest that conventional loop analysis would complement the FX-87 effect system« less

  13. The Effect of Practice Schedule on Context-Dependent Learning.

    PubMed

    Lee, Ya-Yun; Fisher, Beth E

    2018-03-02

    It is well established that random practice compared to blocked practice enhances motor learning. Additionally, while information in the environment may be incidental, learning is also enhanced when an individual performs a task within the same environmental context in which the task was originally practiced. This study aimed to disentangle the effects of practice schedule and incidental/environmental context on motor learning. Participants practiced three finger sequences under either a random or blocked practice schedule. Each sequence was associated with specific incidental context (i.e., color and location on the computer screen) during practice. The participants were tested under the conditions when the sequence-context associations remained the same or were changed from that of practice. When the sequence-context association was changed, the participants who practiced under blocked schedule demonstrated greater performance decrement than those who practiced under random schedule. The findings suggested that those participants who practiced under random schedule were more resistant to the change of environmental context.

  14. A microeconomic scheduler for parallel computers

    NASA Technical Reports Server (NTRS)

    Stoica, Ion; Abdel-Wahab, Hussein; Pothen, Alex

    1995-01-01

    We describe a scheduler based on the microeconomic paradigm for scheduling on-line a set of parallel jobs in a multiprocessor system. In addition to the classical objectives of increasing the system throughput and reducing the response time, we consider fairness in allocating system resources among the users, and providing the user with control over the relative performances of his jobs. We associate with every user a savings account in which he receives money at a constant rate. When a user wants to run a job, he creates an expense account for that job to which he transfers money from his savings account. The job uses the funds in its expense account to obtain the system resources it needs for execution. The share of the system resources allocated to the user is directly related to the rate at which the user receives money; the rate at which the user transfers money into a job expense account controls the job's performance. We prove that starvation is not possible in our model. Simulation results show that our scheduler improves both system and user performances in comparison with two different variable partitioning policies. It is also shown to be effective in guaranteeing fairness and providing control over the performance of jobs.

  15. Utilizing AI in Temporal, Spatial, and Resource Scheduling

    NASA Technical Reports Server (NTRS)

    Stottler, Richard; Kalton, Annaka; Bell, Aaron

    2006-01-01

    Aurora is a software system enabling the rapid, easy solution of complex scheduling problems involving spatial and temporal constraints among operations and scarce resources (such as equipment, workspace, and human experts). Although developed for use in the International Space Station Processing Facility, Aurora is flexible enough that it can be easily customized for application to other scheduling domains and adapted as the requirements change or become more precisely known over time. Aurora s scheduling module utilizes artificial-intelligence (AI) techniques to make scheduling decisions on the basis of domain knowledge, including knowledge of constraints and their relative importance, interdependencies among operations, and possibly frequent changes in governing schedule requirements. Unlike many other scheduling software systems, Aurora focuses on resource requirements and temporal scheduling in combination. For example, Aurora can accommodate a domain requirement to schedule two subsequent operations to locations adjacent to a shared resource. The graphical interface allows the user to quickly visualize the schedule and perform changes reflecting additional knowledge or alterations in the situation. For example, the user might drag the activity corresponding to the start of operations to reflect a late delivery.

  16. 48 CFR 1436.270-2 - Part I-The Schedule.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Construction 1436.270-2 Part I—The Schedule. The CO shall prepare the Schedule as follows: (a) Section A... reliability requirements (See FAR Part 46). (f) Section F, Deliveries or performance. Include Suspension of...

  17. 48 CFR 1436.270-2 - Part I-The Schedule.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Construction 1436.270-2 Part I—The Schedule. The CO shall prepare the Schedule as follows: (a) Section A... reliability requirements (See FAR Part 46). (f) Section F, Deliveries or performance. Include Suspension of...

  18. Investigation of the effectiveness of a split sleep schedule in sustaining sleep and maintaining performance.

    PubMed

    Jackson, Melinda L; Banks, Siobhan; Belenky, Gregory

    2014-12-01

    Shift work is common in today's society, and is associated with negative health outcomes, and accidents and incidents. These detrimental effects can be primarily attributed to sleeping and working at an adverse circadian time. The aim of this study was to examine whether a split sleep schedule is as effective as a consolidated day shift or night shift schedule for maintaining performance and sustaining sleep. Fifty-three healthy male volunteers (mean ± SD age = 26.51 ± 4.07 years) underwent a randomized three condition study design. A split sleep condition involving two 5-h sleeping opportunities in 24 h [time in bed (TIB) 0300 h-0800 h and 1500 h-2000 h] was compared to a 10-h consolidated nighttime sleep (TIB 2200 h-0800 h) and 10-h consolidated daytime sleep (TIB 1000 h-2000 h). All participants underwent a baseline period of 10 h of nocturnal time in bed (TIB) followed by a 5-d simulated workweek spent in one of the three conditions. Polysomnography, psychomotor vigilance task, digit-symbol substitution task and subjective state were assessed. During the 5-d simulated workweek, participants in the nighttime sleep condition slept the most (total sleep time per day (TST) 8.4 h ± 13.4 min), followed by the split sleep condition (TST 7.16 h ± 14.2 min) and the daytime sleep condition (TST 6.4 h ± 15.3 min). Subjective sleepiness was highest in the daytime sleep condition and lowest in the nighttime sleep condition. No significant differences in performance were observed between the conditions. Compared to a nighttime consolidated sleep opportunity or split sleep, placement of a consolidated sleep opportunity during the day yielded truncated sleep and increased sleepiness. Further research in real-world situations is warranted to fully assess the efficacy of alternative split sleep schedules for improving safety and productivity.

  19. Cost, Schedule, And Performance Elements For Comparison of Hydrodynamic Models of Near-Surface Unmanned Underwater Vehicle Operations

    DTIC Science & Technology

    2017-12-01

    2-89) Prescribed by ANSI Std. 239-18 ii THIS PAGE INTENTIONALLY LEFT BLANK iii Approved for public release. Distribution is unlimited. COST ...from the scope of this demonstration due to time constraints. Further study of this software would benefit similar cost , schedule, and performance...NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA SYSTEMS ENGINEERING CAPSTONE PROJECT REPORT Approved for public release. Distribution

  20. A meta-heuristic method for solving scheduling problem: crow search algorithm

    NASA Astrophysics Data System (ADS)

    Adhi, Antono; Santosa, Budi; Siswanto, Nurhadi

    2018-04-01

    Scheduling is one of the most important processes in an industry both in manufacturingand services. The scheduling process is the process of selecting resources to perform an operation on tasks. Resources can be machines, peoples, tasks, jobs or operations.. The selection of optimum sequence of jobs from a permutation is an essential issue in every research in scheduling problem. Optimum sequence becomes optimum solution to resolve scheduling problem. Scheduling problem becomes NP-hard problem since the number of job in the sequence is more than normal number can be processed by exact algorithm. In order to obtain optimum results, it needs a method with capability to solve complex scheduling problems in an acceptable time. Meta-heuristic is a method usually used to solve scheduling problem. The recently published method called Crow Search Algorithm (CSA) is adopted in this research to solve scheduling problem. CSA is an evolutionary meta-heuristic method which is based on the behavior in flocks of crow. The calculation result of CSA for solving scheduling problem is compared with other algorithms. From the comparison, it is found that CSA has better performance in term of optimum solution and time calculation than other algorithms.

  1. Skills training after night shift work enables acquisition of endovascular technical skills on a virtual reality simulator.

    PubMed

    Naughton, Peter A; Aggarwal, Rajesh; Wang, Tim T; Van Herzeele, Isabelle; Keeling, Aoife N; Darzi, Ara W; Cheshire, Nicholas J W

    2011-03-01

    Adoption of residents' working time restrictions potentially undermines surgical training by reduction of operating room exposure. Simulation has been proposed as a way to acquire necessary skills in a laboratory environment but remains difficult to incorporate into training schedules. This study assessed whether residents working successive nights could acquire endovascular skills similar to colleagues working day shifts. This prospective observational cohort study recruited 20 junior residents, divided into day shift and night shift groups by their respective call schedule. After initial cognitive skills training, a validated renal artery stent module on an endovascular simulator was completed over a series of seven sequential shifts during 1 week. The primary outcome measure was serial technical skill assessments. Secondary measures comprised assessments of activity, cognitive performance, introspective fatigue, quality, and quantity of preceding sleep. Both groups demonstrated significant learning curves for total time at the first session median vs seventh session median (181 vs 564 seconds [P < .001]; night, 1399 vs 572 [P < .001]), fluoroscopy time (day, 702 vs 308 seconds, [P < .001]; night, 669 vs 313 [P < .001]), and contrast volume (day, 29 vs 13 mL [P < .001]; night, 40 vs 16 [P < .001]). Residents working day shifts reached plateau 1 day earlier in the above measures vs those on night duty. The night shift group walked more steps (P < .001), reviewed more patients (P < .001), performed worse on all cognitive assessments (P < .05), slept less (P < .05), had poorer quality of sleep (P = .001), and was more fatigued (P < .001) than the day shift group. Acquired skill was retained a week after completion of shifts. Technical skills training after night shift work enables acquisition of endovascular technical skills, although it takes longer than after day shift training. This study provides evidence for program directors to organize simulation

  2. 76 FR 31416 - Federal Acquisition Regulation; Technical Amendments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-31

    ... ADMINISTRATION 48 CFR Parts 52 and 53 [FAC 2005-52; Item VI; Docket 2011-0078; Sequence 2] Federal Acquisition... publication schedules. Please cite FAC 2005-52, Technical Amendments. SUPPLEMENTARY INFORMATION: In order to update certain elements in 48 CFR parts 52 and 53, this document makes editorial changes to the Federal...

  3. 77 FR 64848 - Proposed Collection; Comment Request for Form 1120S, Schedule D, Schedule K-1, and Schedule M-3

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-23

    ... 1120S, Schedule D, Schedule K-1, and Schedule M-3 AGENCY: Internal Revenue Service (IRS), Treasury... (Loss) Reconciliation for S Corporations With Total Assets of $10 Million or More, and Schedule K-1... Corporation, Schedule D (Form 1120S), Capital Gains and Losses and Built-in Gains, Schedule K-1 (Form 1120S...

  4. Learning curves for transapical transcatheter aortic valve replacement in the PARTNER-I trial: Technical performance, success, and safety.

    PubMed

    Suri, Rakesh M; Minha, Sa'ar; Alli, Oluseun; Waksman, Ron; Rihal, Charanjit S; Satler, Lowell P; Greason, Kevin L; Torguson, Rebecca; Pichard, Augusto D; Mack, Michael; Svensson, Lars G; Rajeswaran, Jeevanantham; Lowry, Ashley M; Ehrlinger, John; Mick, Stephanie L; Tuzcu, E Murat; Thourani, Vinod H; Makkar, Raj; Holmes, David; Leon, Martin B; Blackstone, Eugene H

    2016-09-01

    Introduction of hybrid techniques, such as transapical transcatheter aortic valve replacement (TA-TAVR), requires skills that a heart team must master to achieve technical efficiency: the technical performance learning curve. To date, the learning curve for TA-TAVR remains unknown. We therefore evaluated the rate at which technical performance improved, assessed change in occurrence of adverse events in relation to technical performance, and determined whether adverse events after TA-TAVR were linked to acquiring technical performance efficiency (the learning curve). From April 2007 to February 2012, 1100 patients, average age 85.0 ± 6.4 years, underwent TA-TAVR in the PARTNER-I trial. Learning curves were defined by institution-specific patient sequence number using nonlinear mixed modeling. Mean procedure time decreased from 131 to 116 minutes within 30 cases (P = .06) and device success increased to 90% by case 45 (P = .0007). Within 30 days, 354 patients experienced a major adverse event (stroke in 29, death in 96), with possibly decreased complications over time (P ∼ .08). Although longer procedure time was associated with more adverse events (P < .0001), these events were associated with change in patient risk profile, not the technical performance learning curve (P = .8). The learning curve for TA-TAVR was 30 to 45 procedures performed, and technical efficiency was achieved without compromising patient safety. Although fewer patients are now undergoing TAVR via nontransfemoral access, understanding TA-TAVR learning curves and their relationship with outcomes is important as the field moves toward next-generation devices, such as those to replace the mitral valve, delivered via the left ventricular apex. Copyright © 2016 The American Association for Thoracic Surgery. Published by Elsevier Inc. All rights reserved.

  5. Coaching Non-technical Skills Improves Surgical Residents' Performance in a Simulated Operating Room.

    PubMed

    Yule, Steven; Parker, Sarah Henrickson; Wilkinson, Jill; McKinley, Aileen; MacDonald, Jamie; Neill, Adrian; McAdam, Tim

    2015-01-01

    To investigate the effect of coaching on non-technical skills and performance during laparoscopic cholecystectomy in a simulated operating room (OR). Non-technical skills (situation awareness, decision making, teamwork, and leadership) underpin technical ability and are critical to the success of operations and the safety of patients in the OR. The rate of developing assessment tools in this area has outpaced development of workable interventions to improve non-technical skills in surgical training and beyond. A randomized trial was conducted with senior surgical residents (n = 16). Participants were randomized to receive either non-technical skills coaching (intervention) or to self-reflect (control) after each of 5 simulated operations. Coaching was based on the Non-Technical Skills For Surgeons (NOTSS) behavior observation system. Surgeon-coaches trained in this method coached participants in the intervention group for 10 minutes after each simulation. Primary outcome measure was non-technical skills, assessed from video by a surgeon using the NOTSS system. Secondary outcomes were time to call for help during bleeding, operative time, and path length of laparoscopic instruments. Non-technical skills improved in the intervention group from scenario 1 to scenario 5 compared with those in the control group (p = 0.04). The intervention group was faster to call for help when faced with unstoppable bleeding in the final scenario (no. 5; p = 0.03). Coaching improved residents' non-technical skills in the simulated OR compared with those in the control group. Important next steps are to implement non-technical skills coaching in the real OR and assess effect on clinically important process measures and patient outcomes. Copyright © 2015 Association of Program Directors in Surgery. Published by Elsevier Inc. All rights reserved.

  6. Prescribed Travel Schedules for Fatigue Management

    NASA Technical Reports Server (NTRS)

    Whitmire, Alexandra; Johnston, Smith; Lockley, Steven

    2011-01-01

    The NASA Fatigue Management Team is developing recommendations for managing fatigue during travel and for shift work operations, as Clinical Practice Guidelines for the Management of Circadian Desynchrony in ISS Operations. The Guidelines provide the International Space Station (ISS ) flight surgeons and other operational clinicians with evidence-based recommendations for mitigating fatigue and other factors related to sleep loss and circadian desynchronization. As much international travel is involved both before and after flight, the guidelines provide recommendations for: pre-flight training, in-flight operations, and post-flight rehabilitation. The objective of is to standardize the process by which care is provided to crewmembers, ground controllers, and other support personnel such as trainers, when overseas travel or schedule shifting is required. Proper scheduling of countermeasures - light, darkness, melatonin, diet, exercise, and medications - is the cornerstone for facilitating circadian adaptation, improving sleep, enhancing alertness, and optimizing performance. The Guidelines provide, among other things, prescribed travel schedules that outline the specific implementation of these mitigation strategies. Each travel schedule offers evidence based protocols for properly using the NASA identified countermeasures for fatigue. This presentation will describe the travel implementation schedules and how these can be used to alleviate the effects of jet lag and/or schedule shifts.

  7. Knowledge-based scheduling of arrival aircraft

    NASA Technical Reports Server (NTRS)

    Krzeczowski, K.; Davis, T.; Erzberger, H.; Lev-Ram, I.; Bergh, C.

    1995-01-01

    A knowledge-based method for scheduling arrival aircraft in the terminal area has been implemented and tested in real-time simulation. The scheduling system automatically sequences, assigns landing times, and assigns runways to arrival aircraft by utilizing continuous updates of aircraft radar data and controller inputs. The scheduling algorithms is driven by a knowledge base which was obtained in over two thousand hours of controller-in-the-loop real-time simulation. The knowledge base contains a series of hierarchical 'rules' and decision logic that examines both performance criteria, such as delay reduction, as well as workload reduction criteria, such as conflict avoidance. The objective of the algorithms is to devise an efficient plan to land the aircraft in a manner acceptable to the air traffic controllers. This paper will describe the scheduling algorithms, give examples of their use, and present data regarding their potential benefits to the air traffic system.

  8. Space communications scheduler: A rule-based approach to adaptive deadline scheduling

    NASA Technical Reports Server (NTRS)

    Straguzzi, Nicholas

    1990-01-01

    Job scheduling is a deceptively complex subfield of computer science. The highly combinatorial nature of the problem, which is NP-complete in nearly all cases, requires a scheduling program to intelligently transverse an immense search tree to create the best possible schedule in a minimal amount of time. In addition, the program must continually make adjustments to the initial schedule when faced with last-minute user requests, cancellations, unexpected device failures, quests, cancellations, unexpected device failures, etc. A good scheduler must be quick, flexible, and efficient, even at the expense of generating slightly less-than-optimal schedules. The Space Communication Scheduler (SCS) is an intelligent rule-based scheduling system. SCS is an adaptive deadline scheduler which allocates modular communications resources to meet an ordered set of user-specified job requests on board the NASA Space Station. SCS uses pattern matching techniques to detect potential conflicts through algorithmic and heuristic means. As a result, the system generates and maintains high density schedules without relying heavily on backtracking or blind search techniques. SCS is suitable for many common real-world applications.

  9. Genetic algorithm to solve the problems of lectures and practicums scheduling

    NASA Astrophysics Data System (ADS)

    Syahputra, M. F.; Apriani, R.; Sawaluddin; Abdullah, D.; Albra, W.; Heikal, M.; Abdurrahman, A.; Khaddafi, M.

    2018-02-01

    Generally, the scheduling process is done manually. However, this method has a low accuracy level, along with possibilities that a scheduled process collides with another scheduled process. When doing theory class and practicum timetable scheduling process, there are numerous problems, such as lecturer teaching schedule collision, schedule collision with another schedule, practicum lesson schedules that collides with theory class, and the number of classrooms available. In this research, genetic algorithm is implemented to perform theory class and practicum timetable scheduling process. The algorithm will be used to process the data containing lists of lecturers, courses, and class rooms, obtained from information technology department at University of Sumatera Utara. The result of scheduling process using genetic algorithm is the most optimal timetable that conforms to available time slots, class rooms, courses, and lecturer schedules.

  10. 5 CFR 293.404 - Retention schedule.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... RECORDS Employee Performance File System Records § 293.404 Retention schedule. (a)(1) Except as provided... in this system, including transfer with the employee who changes positions, shall be as agencies... performance-related documents five years old or less shall be forwarded in the Employee Performance File along...

  11. 5 CFR 293.404 - Retention schedule.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... RECORDS Employee Performance File System Records § 293.404 Retention schedule. (a)(1) Except as provided... in this system, including transfer with the employee who changes positions, shall be as agencies... performance-related documents five years old or less shall be forwarded in the Employee Performance File along...

  12. 5 CFR 293.404 - Retention schedule.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... RECORDS Employee Performance File System Records § 293.404 Retention schedule. (a)(1) Except as provided... in this system, including transfer with the employee who changes positions, shall be as agencies... performance-related documents five years old or less shall be forwarded in the Employee Performance File along...

  13. 5 CFR 293.404 - Retention schedule.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... RECORDS Employee Performance File System Records § 293.404 Retention schedule. (a)(1) Except as provided... in this system, including transfer with the employee who changes positions, shall be as agencies... performance-related documents five years old or less shall be forwarded in the Employee Performance File along...

  14. Intraoperative adverse events can be compensated by technical performance in neonates and infants after cardiac surgery: a prospective study.

    PubMed

    Nathan, Meena; Karamichalis, John M; Liu, Hua; del Nido, Pedro; Pigula, Frank; Thiagarajan, Ravi; Bacha, Emile A

    2011-11-01

    Our objective was to define the relationship between surgical technical performance score, intraoperative adverse events, and major postoperative adverse events in complex pediatric cardiac repairs. Infants younger than 6 months were prospectively followed up until discharge from the hospital. Technical performance scores were graded as optimal, adequate, or inadequate based on discharge echocardiograms and need for reintervention after initial surgery. Case complexity was determined by Risk Adjustment in Congenital Heart Surgery (RACHS-1) category, and preoperative illness severity was assessed by Pediatric Risk of Mortality (PRISM) III score. Intraoperative adverse events were prospectively monitored. Outcomes were analyzed using nonparametric methods and a logistic regression model. A total of 166 patients (RACHS 4-6 [49%]), neonates [50%]) were observed. Sixty-one (37%) had at least 1 intraoperative adverse event, and 47 (28.3%) had at least 1 major postoperative adverse event. There was no correlation between intraoperative adverse events and RACHS, preoperative PRISM III, technical performance score, or postoperative adverse events on multivariate analysis. For the entire cohort, better technical performance score resulted in lower postoperative adverse events, lower postoperative PRISM, and lower length of stay and ventilation time (P < .001). Patients requiring intraoperative revisions fared as well as patients without, provided the technical score was at least adequate. In neonatal and infant open heart repairs, technical performance score is one of the main predictors of postoperative morbidity. Outcomes are not affected by intraoperative adverse events, including surgical revisions, provided technical performance score is at least adequate. Copyright © 2011 The American Association for Thoracic Surgery. Published by Mosby, Inc. All rights reserved.

  15. Autonomous mission planning and scheduling: Innovative, integrated, responsive

    NASA Technical Reports Server (NTRS)

    Sary, Charisse; Liu, Simon; Hull, Larry; Davis, Randy

    1994-01-01

    Autonomous mission scheduling, a new concept for NASA ground data systems, is a decentralized and distributed approach to scientific spacecraft planning, scheduling, and command management. Systems and services are provided that enable investigators to operate their own instruments. In autonomous mission scheduling, separate nodes exist for each instrument and one or more operations nodes exist for the spacecraft. Each node is responsible for its own operations which include planning, scheduling, and commanding; and for resolving conflicts with other nodes. One or more database servers accessible to all nodes enable each to share mission and science planning, scheduling, and commanding information. The architecture for autonomous mission scheduling is based upon a realistic mix of state-of-the-art and emerging technology and services, e.g., high performance individual workstations, high speed communications, client-server computing, and relational databases. The concept is particularly suited to the smaller, less complex missions of the future.

  16. Quantitative Imaging Biomarkers: A Review of Statistical Methods for Technical Performance Assessment

    PubMed Central

    2017-01-01

    Technological developments and greater rigor in the quantitative measurement of biological features in medical images have given rise to an increased interest in using quantitative imaging biomarkers (QIBs) to measure changes in these features. Critical to the performance of a QIB in preclinical or clinical settings are three primary metrology areas of interest: measurement linearity and bias, repeatability, and the ability to consistently reproduce equivalent results when conditions change, as would be expected in any clinical trial. Unfortunately, performance studies to date differ greatly in designs, analysis method and metrics used to assess a QIB for clinical use. It is therefore, difficult or not possible to integrate results from different studies or to use reported results to design studies. The Radiological Society of North America (RSNA) and the Quantitative Imaging Biomarker Alliance (QIBA) with technical, radiological and statistical experts developed a set of technical performance analysis methods, metrics and study designs that provide terminology, metrics and methods consistent with widely accepted metrological standards. This document provides a consistent framework for the conduct and evaluation of QIB performance studies so that results from multiple studies can be compared, contrasted or combined. PMID:24919831

  17. Scheduling Results for the THEMIS Observation Scheduling Tool

    NASA Technical Reports Server (NTRS)

    Mclaren, David; Rabideau, Gregg; Chien, Steve; Knight, Russell; Anwar, Sadaat; Mehall, Greg; Christensen, Philip

    2011-01-01

    We describe a scheduling system intended to assist in the development of instrument data acquisitions for the THEMIS instrument, onboard the Mars Odyssey spacecraft, and compare results from multiple scheduling algorithms. This tool creates observations of both (a) targeted geographical regions of interest and (b) general mapping observations, while respecting spacecraft constraints such as data volume, observation timing, visibility, lighting, season, and science priorities. This tool therefore must address both geometric and state/timing/resource constraints. We describe a tool that maps geometric polygon overlap constraints to set covering constraints using a grid-based approach. These set covering constraints are then incorporated into a greedy optimization scheduling algorithm incorporating operations constraints to generate feasible schedules. The resultant tool generates schedules of hundreds of observations per week out of potential thousands of observations. This tool is currently under evaluation by the THEMIS observation planning team at Arizona State University.

  18. Naval Postgraduate School Scheduling Support System (NPS4)

    DTIC Science & Technology

    1992-03-01

    NPSS ...... .................. 156 2. Final Exam Scheduler .. .......... 159 F. PRESENTATION SYSTEM ... ............. . 160 G. USER INTERFACE... NPSS ...... .................. 185 2. Final Exam Model ... ............ 186 3. The Class Schedulers .. .......... 186 4. Assessment of Problem Model...Information Distribution ....... 150 4.13 NPSS Optimization Process .... ............ . 157 4.14 NPSS Performance ..... ................ . 159 4.15 Department

  19. 42 CFR 493.1409 - Condition: Laboratories performing moderate complexity testing; technical consultant.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false Condition: Laboratories performing moderate complexity testing; technical consultant. 493.1409 Section 493.1409 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) STANDARDS AND CERTIFICATION...

  20. 42 CFR 493.1409 - Condition: Laboratories performing moderate complexity testing; technical consultant.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 5 2011-10-01 2011-10-01 false Condition: Laboratories performing moderate complexity testing; technical consultant. 493.1409 Section 493.1409 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) STANDARDS AND CERTIFICATION...

  1. Technical match characteristics and influence of body anthropometry on playing performance in male elite team handball.

    PubMed

    Michalsik, Lars Bojsen; Madsen, Klavs; Aagaard, Per

    2015-02-01

    Modern team handball match-play imposes substantial physical and technical demands on elite players. However, only limited knowledge seems to exist about the specific working requirements in elite team handball. Thus, the purpose of this study was to examine the physical demands imposed on male elite team handball players in relation to playing position and body anthropometry. Based on continuous video recording of individual players during elite team handball match-play (62 tournament games, ∼4 players per game), computerized technical match analysis was performed in male elite team handball players along with anthropometric measurements over a 6 season time span. Technical match activities were distributed in 6 major types of playing actions (shots, breakthroughs, fast breaks, tackles, technical errors, and defense errors) and further divided into various subcategories (e.g., hard or light tackles, type of shot, claspings, screenings, and blockings). Players showed 36.9 ± 13.1 (group mean ± SD) high-intense technical playing actions per match with a mean total effective playing time of 53.85 ± 5.87 minutes. In offense, each player performed 6.0 ± 5.2 fast breaks, received 34.5 ± 21.3 tackles in total, and performed in defense 3.7 ± 3.5 blockings, 3.9 ± 3.0 claspings, and 5.8 ± 3.6 hard tackles. Wing players (84.5 ± 5.8 kg, 184.9 ± 5.7 cm) were less heavy and smaller (p < 0.001) than backcourt players (94.7 ± 7.1 kg, 191.9 ± 5.4 cm) and pivots (99.4 ± 6.2 kg, 194.8 ± 3.6 cm). In conclusion, modern male elite team handball match-play is characterized by a high number of short-term, high-intense intermittent technical playing actions. Indications of technical fatigue were observed. Physical demands differed between playing positions with wing players performing more fast breaks and less physical confrontations with opponent players than backcourt players and pivots. Body anthropometry seemed to have an important influence on playing performance

  2. An intensive combined training program modulates physical, physiological, biomotoric, and technical parameters in women basketball players.

    PubMed

    Kilinç, Fatih

    2008-11-01

    The purpose of this study was the investigation of the effects of an intensive combined training program based on the pretest scores of a university women's basketball team on their physical, physiological, biomotoric, and technical features. Twenty-four university volunteers were equally divided into two groups: an experiment group (intensive combined training group) and a control (technical training) group. The 10-week intensive combined training program was performed on the experiment group according to their pretest outcomes. Before and at the end of each period of training, which was scheduled four times a week, the physical, physiological, biomotoric, and technical performance of each subject were determined. With respect to the pre- and posttest measurements, the basketball group showed significant differences (p < 0.05) in girth measurements (shoulder, waist, hip, arm, thigh, and calf), in skinfold measurements (percent body fat), in physiological measurements (vital capacity and forced vital capacity), in biomotoric tests (right-left hand grip, dynamic and countermovement jump, sit-up, push-up, 1500-m endurance), and in technique tests (free and inside shooting). It can be concluded that a 10-week intensive combined training program performed on university women basketball players had a significant effect on improving their physical, physiological, biomotoric, and technical features. It proved to be highly recommendable for female basketball players who are preparing for short-term tournaments; the basketball group in this study won a championship.

  3. 48 CFR 227.7103-2 - Acquisition of technical data.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) Identify the type and quantity of the technical data to be delivered under the contract and the format and...-price type contract; (4) Include delivery schedules and acceptance criteria for each deliverable data... data. 227.7103-2 Section 227.7103-2 Federal Acquisition Regulations System DEFENSE ACQUISITION...

  4. 48 CFR 227.7103-2 - Acquisition of technical data.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) Identify the type and quantity of the technical data to be delivered under the contract and the format and...-price type contract; (4) Include delivery schedules and acceptance criteria for each deliverable data... data. 227.7103-2 Section 227.7103-2 Federal Acquisition Regulations System DEFENSE ACQUISITION...

  5. 48 CFR 227.7103-2 - Acquisition of technical data.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) Identify the type and quantity of the technical data to be delivered under the contract and the format and...-price type contract; (4) Include delivery schedules and acceptance criteria for each deliverable data... data. 227.7103-2 Section 227.7103-2 Federal Acquisition Regulations System DEFENSE ACQUISITION...

  6. 48 CFR 227.7103-2 - Acquisition of technical data.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) Identify the type and quantity of the technical data to be delivered under the contract and the format and...-price type contract; (4) Include delivery schedules and acceptance criteria for each deliverable data... data. 227.7103-2 Section 227.7103-2 Federal Acquisition Regulations System DEFENSE ACQUISITION...

  7. 48 CFR 227.7103-2 - Acquisition of technical data.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) Identify the type and quantity of the technical data to be delivered under the contract and the format and...-price type contract; (4) Include delivery schedules and acceptance criteria for each deliverable data... data. 227.7103-2 Section 227.7103-2 Federal Acquisition Regulations System DEFENSE ACQUISITION...

  8. Production Scheduling of Sequenced Tapes for Printed Circuit Pack Assembly.

    DTIC Science & Technology

    1987-07-09

    detail. L j 6 The subject matter of this thesis is inspired directly from their technical report. The goals of this research are twofold: 1) Test their...The subject matter of the following chapters describes a heuristic approach to another variation of the sequenced tape production scheduling problem...assignment problem, comprise the subject matter of Chapter 5. It is sufficient to note that the three definitions of the term common correspond to the

  9. Scheduling techniques in the Request Oriented Scheduling Engine (ROSE)

    NASA Technical Reports Server (NTRS)

    Zoch, David R.

    1991-01-01

    Scheduling techniques in the ROSE are presented in the form of the viewgraphs. The following subject areas are covered: agenda; ROSE summary and history; NCC-ROSE task goals; accomplishments; ROSE timeline manager; scheduling concerns; current and ROSE approaches; initial scheduling; BFSSE overview and example; and summary.

  10. Interference Cognizant Network Scheduling

    NASA Technical Reports Server (NTRS)

    Hall, Brendan (Inventor); Bonk, Ted (Inventor); DeLay, Benjamin F. (Inventor); Varadarajan, Srivatsan (Inventor); Smithgall, William Todd (Inventor)

    2017-01-01

    Systems and methods for interference cognizant network scheduling are provided. In certain embodiments, a method of scheduling communications in a network comprises identifying a bin of a global timeline for scheduling an unscheduled virtual link, wherein a bin is a segment of the timeline; identifying a pre-scheduled virtual link in the bin; and determining if the pre-scheduled and unscheduled virtual links share a port. In certain embodiments, if the unscheduled and pre-scheduled virtual links don't share a port, scheduling transmission of the unscheduled virtual link to overlap with the scheduled transmission of the pre-scheduled virtual link; and if the unscheduled and pre-scheduled virtual links share a port: determining a start time delay for the unscheduled virtual link based on the port; and scheduling transmission of the unscheduled virtual link in the bin based on the start time delay to overlap part of the scheduled transmission of the pre-scheduled virtual link.

  11. Separation Assurance and Scheduling Coordination in the Arrival Environment

    NASA Technical Reports Server (NTRS)

    Aweiss, Arwa S.; Cone, Andrew C.; Holladay, Joshua J.; Munoz, Epifanio; Lewis, Timothy A.

    2016-01-01

    Separation assurance (SA) automation has been proposed as either a ground-based or airborne paradigm. The arrival environment is complex because aircraft are being sequenced and spaced to the arrival fix. This paper examines the effect of the allocation of the SA and scheduling functions on the performance of the system. Two coordination configurations between an SA and an arrival management system are tested using both ground and airborne implementations. All configurations have a conflict detection and resolution (CD&R) system and either an integrated or separated scheduler. Performance metrics are presented for the ground and airborne systems based on arrival traffic headed to Dallas/ Fort Worth International airport. The total delay, time-spacing conformance, and schedule conformance are used to measure efficiency. The goal of the analysis is to use the metrics to identify performance differences between the configurations that are based on different function allocations. A surveillance range limitation of 100 nmi and a time delay for sharing updated trajectory intent of 30 seconds were implemented for the airborne system. Overall, these results indicate that the surveillance range and the sharing of trajectories and aircraft schedules are important factors in determining the efficiency of an airborne arrival management system. These parameters are not relevant to the ground-based system as modeled for this study because it has instantaneous access to all aircraft trajectories and intent. Creating a schedule external to the CD&R and the scheduling conformance system was seen to reduce total delays for the airborne system, and had a minor effect on the ground-based system. The effect of an external scheduler on other metrics was mixed.

  12. Effects of Practice Schedule on Wind Instrument Performance: A Preliminary Application of a Motor Learning Principle

    ERIC Educational Resources Information Center

    Stambaugh, Laura A.; Demorest, Steven M.

    2010-01-01

    The effects of three practice schedules on beginning instrumental achievement were explored. A total of 19 seventh-grade clarinet and saxophone students completed one 18-minute practice session using either a blocked schedule causing a low level of cognitive (contextual) interference, a hybrid schedule causing a moderate level of interference, or…

  13. Second-order schedules: comparison of different procedures for scheduling paired and nonpaired brief stimuli

    PubMed Central

    Stubbs, D. Alan; Cohen, Steven L.

    1972-01-01

    Pigeons performed on a second-order schedule in which fixed-interval components were maintained under a variable-interval schedule. Completion of each fixed-interval component resulted in a brief-stimulus presentation and/or food. The relation of the brief stimulus and food was varied across conditions. Under some conditions, the brief stimulus was never paired with food. Under other conditions, the brief stimulus was paired with food; three different pairing procedures were used: (a) a response produced the simultaneous onset of the stimulus and food; (b) a response produced the stimulus before food with the stimulus remaining on during food presentation; (c) a response produced the stimulus and the offset of the stimulus was simultaneous with the onset of the food cycle. The various pairing and nonpairing operations all produced similar effects on performance. Under all conditions, response rates were positively accelerated within fixed-interval components. Total response rates and Index of Curvature measures were similar across conditions. In one condition, a blackout was paired with food; with this different stimulus in effect, less curvature resulted. The results suggest that pairing of a stimulus is not a necessary condition for within-component patterning under some second-order schedules. PMID:16811634

  14. The Isolation of Motivational, Motoric, and Schedule Effects on Operant Performance: A Modeling Approach

    ERIC Educational Resources Information Center

    Brackney, Ryan J.; Cheung, Timothy H. C.; Neisewander, Janet L.; Sanabria, Federico

    2011-01-01

    Dissociating motoric and motivational effects of pharmacological manipulations on operant behavior is a substantial challenge. To address this problem, we applied a response-bout analysis to data from rats trained to lever press for sucrose on variable-interval (VI) schedules of reinforcement. Motoric, motivational, and schedule factors (effort…

  15. Power-based Shift Schedule for Pure Electric Vehicle with a Two-speed Automatic Transmission

    NASA Astrophysics Data System (ADS)

    Wang, Jiaqi; Liu, Yanfang; Liu, Qiang; Xu, Xiangyang

    2016-11-01

    This paper introduces a comprehensive shift schedule for a two-speed automatic transmission of pure electric vehicle. Considering about driving ability and efficiency performance of electric vehicles, the power-based shift schedule is proposed with three principles. This comprehensive shift schedule regards the vehicle current speed and motor load power as input parameters to satisfy the vehicle driving power demand with lowest energy consumption. A simulation model has been established to verify the dynamic and economic performance of comprehensive shift schedule. Compared with traditional dynamic and economic shift schedules, simulation results indicate that the power-based shift schedule is superior to traditional shift schedules.

  16. Tug fleet and ground operations schedules and controls. Volume 2: part 1

    NASA Technical Reports Server (NTRS)

    1975-01-01

    This Tug Fleet and Ground Operations Schedules and Controls Study addresses both ground operational data and technical requirements that span the Tug planning phase and operations phase. A similar study covering mission operations (by others) provides the complimentary flight operations details. The two studies provide the planning data requirements, resource allocation, and control milestones for supporting the requirements of the STS program. This Tug Fleet and Ground Operations Schedules and Controls Study incorporates the basic ground operations requirements and concepts provided by previous studies with the interrelationships of the planning, IUS transition, and Tug fleet operations phases. The interrelationships of these phases were studied as a system to optimize overall program benefits and minimize operational risk factors.

  17. Advanced Transportation System Studies. Technical Area 3: Alternate Propulsion Subsystems Concepts. Volume 3; Program Cost Estimates

    NASA Technical Reports Server (NTRS)

    Levack, Daniel J. H.

    2000-01-01

    The objective of this contract was to provide definition of alternate propulsion systems for both earth-to-orbit (ETO) and in-space vehicles (upper stages and space transfer vehicles). For such propulsion systems, technical data to describe performance, weight, dimensions, etc. was provided along with programmatic information such as cost, schedule, needed facilities, etc. Advanced technology and advanced development needs were determined and provided. This volume separately presents the various program cost estimates that were generated under three tasks: the F- IA Restart Task, the J-2S Restart Task, and the SSME Upper Stage Use Task. The conclusions, technical results , and the program cost estimates are described in more detail in Volume I - Executive Summary and in individual Final Task Reports.

  18. 42 CFR 493.1447 - Condition: Laboratories performing high complexity testing; technical supervisor.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 5 2011-10-01 2011-10-01 false Condition: Laboratories performing high complexity testing; technical supervisor. 493.1447 Section 493.1447 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) STANDARDS AND CERTIFICATION LABORATORY...

  19. 42 CFR 493.1447 - Condition: Laboratories performing high complexity testing; technical supervisor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false Condition: Laboratories performing high complexity testing; technical supervisor. 493.1447 Section 493.1447 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) STANDARDS AND CERTIFICATION LABORATORY...

  20. Alternative work schedules for female pharmacists.

    PubMed

    Mason, N A; Perry, W R; Ryan, M L

    1991-01-01

    The impact of the increased proportion of women in pharmacy is discussed, and two leadership positions for which part-time work schedules were implemented are described. Issues associated with the increased representation of women include pharmacist shortages, loss of future leaders, decreased staff productivity related to inadequate day-care services, and a reduced earning potential of pharmacists. Many of these problems can be addressed by altering benefit packages and work schedules to enable employees to raise children while continuing to work. Specific strategies include legislation, day-care programs, flex time and flex scheduling, telecommuting, and the creation of alternative work schedules or permanent part-time positions. At the University of Michigan, a part-time position that combines faculty and clinical responsibilities has been in place since 1988. At The Washington Hospital Center, one of the three assistant director of pharmacy positions is part-time. The women in both positions have met or exceeded job performance requirements while raising a family. Issues raised by the increasing number of female pharmacists must be addressed by the profession. Part-time work schedules are one strategy for enabling female pharmacists to meet both their family and career responsibilities.

  1. Non preemptive soft real time scheduler: High deadline meeting rate on overload

    NASA Astrophysics Data System (ADS)

    Khalib, Zahereel Ishwar Abdul; Ahmad, R. Badlishah; El-Shaikh, Mohamed

    2015-05-01

    While preemptive scheduling has gain more attention among researchers, current work in non preemptive scheduling had shown promising result in soft real time jobs scheduling. In this paper we present a non preemptive scheduling algorithm meant for soft real time applications, which is capable of producing better performance during overload while maintaining excellent performance during normal load. The approach taken by this algorithm has shown more promising results compared to other algorithms including its immediate predecessor. We will present the analysis made prior to inception of the algorithm as well as simulation results comparing our algorithm named gutEDF with EDF and gEDF. We are convinced that grouping jobs utilizing pure dynamic parameters would produce better performance.

  2. Characterization of Tactical Departure Scheduling in the National Airspace System

    NASA Technical Reports Server (NTRS)

    Capps, Alan; Engelland, Shawn A.

    2011-01-01

    This paper discusses and analyzes current day utilization and performance of the tactical departure scheduling process in the National Airspace System (NAS) to understand the benefits in improving this process. The analysis used operational air traffic data from over 1,082,000 flights during the month of January, 2011. Specific metrics included the frequency of tactical departure scheduling, site specific variances in the technology's utilization, departure time prediction compliance used in the tactical scheduling process and the performance with which the current system can predict the airborne slot that aircraft are being scheduled into from the airport surface. Operational data analysis described in this paper indicates significant room for improvement exists in the current system primarily in the area of reduced departure time prediction uncertainty. Results indicate that a significant number of tactically scheduled aircraft did not meet their scheduled departure slot due to departure time uncertainty. In addition to missed slots, the operational data analysis identified increased controller workload associated with tactical departures which were subject to traffic management manual re-scheduling or controller swaps. An analysis of achievable levels of departure time prediction accuracy as obtained by a new integrated surface and tactical scheduling tool is provided to assess the benefit it may provide as a solution to the identified shortfalls. A list of NAS facilities which are likely to receive the greatest benefit from the integrated surface and tactical scheduling technology are provided.

  3. Joint Polar Satellite System (JPSS) Common Ground System (CGS) Current Technical Performance Measures

    NASA Astrophysics Data System (ADS)

    Cochran, S.; Panas, M.; Jamilkowski, M. L.; Miller, S. W.

    2015-12-01

    ABSTRACT The National Oceanic and Atmospheric Administration (NOAA) and National Aeronautics and Space Administration (NASA) are jointly acquiring the next-generation civilian weather and environmental satellite system: the Joint Polar Satellite System (JPSS). The Joint Polar Satellite System will replace the afternoon orbit component and ground processing system of the current Polar-orbiting Operational Environmental Satellites (POES) managed by NOAA. The JPSS satellites will carry a suite of sensors designed to collect meteorological, oceanographic, climatological and geophysical observations of the Earth. The ground processing system for JPSS is known as the JPSS Common Ground System (JPSS CGS). Developed and maintained by Raytheon Intelligence, Information and Services (IIS), the CGS is a multi-mission enterprise system serving NOAA, NASA and their national and international partners. The CGS has demonstrated its scalability and flexibility to incorporate multiple missions efficiently and with minimal cost, schedule and risk, while strengthening global partnerships in weather and environmental monitoring. The CGS architecture is being upgraded to Block 2.0 in 2015 to "operationalize" S-NPP, leverage lessons learned to date in multi-mission support, take advantage of more reliable and efficient technologies, and satisfy new requirements and constraints in the continually evolving budgetary environment. To ensure the CGS meets these needs, we have developed 49 Technical Performance Measures (TPMs) across 10 categories, such as data latency, operational availability and scalability. This paper will provide an overview of the CGS Block 2.0 architecture, with particular focus on the 10 TPM categories listed above. We will provide updates on how we ensure the deployed architecture meets these TPMs to satisfy our multi-mission objectives with the deployment of Block 2.0.

  4. Relationships between Classroom Schedule Types and Performance on the Algebra I Criterion-Referenced Test

    ERIC Educational Resources Information Center

    Murray, Gregory V.; Moyer-Packenham, Patricia S.

    2014-01-01

    One option for length of individual mathematics class periods is the schedule type selected for Algebra I classes. This study examined the relationship between student achievement, as indicated by Algebra I Criterion-Referenced Test scores, and the schedule type for Algebra I classes. Data obtained from the Utah State Office of Education included…

  5. Meta-analysis of the technical performance of an imaging procedure: guidelines and statistical methodology.

    PubMed

    Huang, Erich P; Wang, Xiao-Feng; Choudhury, Kingshuk Roy; McShane, Lisa M; Gönen, Mithat; Ye, Jingjing; Buckler, Andrew J; Kinahan, Paul E; Reeves, Anthony P; Jackson, Edward F; Guimaraes, Alexander R; Zahlmann, Gudrun

    2015-02-01

    Medical imaging serves many roles in patient care and the drug approval process, including assessing treatment response and guiding treatment decisions. These roles often involve a quantitative imaging biomarker, an objectively measured characteristic of the underlying anatomic structure or biochemical process derived from medical images. Before a quantitative imaging biomarker is accepted for use in such roles, the imaging procedure to acquire it must undergo evaluation of its technical performance, which entails assessment of performance metrics such as repeatability and reproducibility of the quantitative imaging biomarker. Ideally, this evaluation will involve quantitative summaries of results from multiple studies to overcome limitations due to the typically small sample sizes of technical performance studies and/or to include a broader range of clinical settings and patient populations. This paper is a review of meta-analysis procedures for such an evaluation, including identification of suitable studies, statistical methodology to evaluate and summarize the performance metrics, and complete and transparent reporting of the results. This review addresses challenges typical of meta-analyses of technical performance, particularly small study sizes, which often causes violations of assumptions underlying standard meta-analysis techniques. Alternative approaches to address these difficulties are also presented; simulation studies indicate that they outperform standard techniques when some studies are small. The meta-analysis procedures presented are also applied to actual [18F]-fluorodeoxyglucose positron emission tomography (FDG-PET) test-retest repeatability data for illustrative purposes. © The Author(s) 2014 Reprints and permissions: sagepub.co.uk/journalsPermissions.nav.

  6. Meta-analysis of the technical performance of an imaging procedure: Guidelines and statistical methodology

    PubMed Central

    Huang, Erich P; Wang, Xiao-Feng; Choudhury, Kingshuk Roy; McShane, Lisa M; Gönen, Mithat; Ye, Jingjing; Buckler, Andrew J; Kinahan, Paul E; Reeves, Anthony P; Jackson, Edward F; Guimaraes, Alexander R; Zahlmann, Gudrun

    2017-01-01

    Medical imaging serves many roles in patient care and the drug approval process, including assessing treatment response and guiding treatment decisions. These roles often involve a quantitative imaging biomarker, an objectively measured characteristic of the underlying anatomic structure or biochemical process derived from medical images. Before a quantitative imaging biomarker is accepted for use in such roles, the imaging procedure to acquire it must undergo evaluation of its technical performance, which entails assessment of performance metrics such as repeatability and reproducibility of the quantitative imaging biomarker. Ideally, this evaluation will involve quantitative summaries of results from multiple studies to overcome limitations due to the typically small sample sizes of technical performance studies and/or to include a broader range of clinical settings and patient populations. This paper is a review of meta-analysis procedures for such an evaluation, including identification of suitable studies, statistical methodology to evaluate and summarize the performance metrics, and complete and transparent reporting of the results. This review addresses challenges typical of meta-analyses of technical performance, particularly small study sizes, which often causes violations of assumptions underlying standard meta-analysis techniques. Alternative approaches to address these difficulties are also presented; simulation studies indicate that they outperform standard techniques when some studies are small. The meta-analysis procedures presented are also applied to actual [18F]-fluorodeoxyglucose positron emission tomography (FDG-PET) test–retest repeatability data for illustrative purposes. PMID:24872353

  7. 5 CFR 293.404 - Retention schedule.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... acceptable performance from the date of the written advance notice of the proposed removal or reduction in....404 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL RECORDS Employee Performance File System Records § 293.404 Retention schedule. (a)(1) Except as provided...

  8. Cost and schedule estimation study report

    NASA Technical Reports Server (NTRS)

    Condon, Steve; Regardie, Myrna; Stark, Mike; Waligora, Sharon

    1993-01-01

    This report describes the analysis performed and the findings of a study of the software development cost and schedule estimation models used by the Flight Dynamics Division (FDD), Goddard Space Flight Center. The study analyzes typical FDD projects, focusing primarily on those developed since 1982. The study reconfirms the standard SEL effort estimation model that is based on size adjusted for reuse; however, guidelines for the productivity and growth parameters in the baseline effort model have been updated. The study also produced a schedule prediction model based on empirical data that varies depending on application type. Models for the distribution of effort and schedule by life-cycle phase are also presented. Finally, this report explains how to use these models to plan SEL projects.

  9. Performance Evaluation of Technical Institutions: An Application of Data Envelopment Analysis

    ERIC Educational Resources Information Center

    Debnath, Roma Mitra; Shankar, Ravi; Kumar, Surender

    2008-01-01

    Technical institutions (TIs) are playing an important role in making India a knowledge hub of this century. There is still great diversity in their relative performance, which is a matter of concern to the education planner. This article employs the method of data envelopment analysis (DEA) to compare the relative efficiency of TIs in India. The…

  10. Scheduling periodic jobs using imprecise results

    NASA Technical Reports Server (NTRS)

    Chung, Jen-Yao; Liu, Jane W. S.; Lin, Kwei-Jay

    1987-01-01

    One approach to avoid timing faults in hard, real-time systems is to make available intermediate, imprecise results produced by real-time processes. When a result of the desired quality cannot be produced in time, an imprecise result of acceptable quality produced before the deadline can be used. The problem of scheduling periodic jobs to meet deadlines on a system that provides the necessary programming language primitives and run-time support for processes to return imprecise results is discussed. Since the scheduler may choose to terminate a task before it is completed, causing it to produce an acceptable but imprecise result, the amount of processor time assigned to any task in a valid schedule can be less than the amount of time required to complete the task. A meaningful formulation of the scheduling problem must take into account the overall quality of the results. Depending on the different types of undesirable effects caused by errors, jobs are classified as type N or type C. For type N jobs, the effects of errors in results produced in different periods are not cumulative. A reasonable performance measure is the average error over all jobs. Three heuristic algorithms that lead to feasible schedules with small average errors are described. For type C jobs, the undesirable effects of errors produced in different periods are cumulative. Schedulability criteria of type C jobs are discussed.

  11. A customizable, scalable scheduling and reporting system.

    PubMed

    Wood, Jody L; Whitman, Beverly J; Mackley, Lisa A; Armstrong, Robert; Shotto, Robert T

    2014-06-01

    Scheduling is essential for running a facility smoothly and for summarizing activities in use reports. The Penn State Hershey Clinical Simulation Center has developed a scheduling interface that uses off-the-shelf components, with customizations that adapt to each institution's data collection and reporting needs. The system is designed using programs within the Microsoft Office 2010 suite. Outlook provides the scheduling component, while the reporting is performed using Access or Excel. An account with a calendar is created for the main schedule, with separate resource accounts created for each room within the center. The Outlook appointment form's 2 default tabs are used, in addition to a customized third tab. The data are then copied from the calendar into either a database table or a spreadsheet, where the reports are generated.Incorporating this system into an institution-wide structure allows integration of personnel lists and potentially enables all users to check the schedule from their desktop. Outlook also has a Web-based application for viewing the basic schedule from outside the institution, although customized data cannot be accessed. The scheduling and reporting functions have been used for a year at the Penn State Hershey Clinical Simulation Center. The schedule has increased workflow efficiency, improved the quality of recorded information, and provided more accurate reporting. The Penn State Hershey Clinical Simulation Center's scheduling and reporting system can be adapted easily to most simulation centers and can expand and change to meet future growth with little or no expense to the center.

  12. Testing the performance of technical trading rules in the Chinese markets based on superior predictive test

    NASA Astrophysics Data System (ADS)

    Wang, Shan; Jiang, Zhi-Qiang; Li, Sai-Ping; Zhou, Wei-Xing

    2015-12-01

    Technical trading rules have a long history of being used by practitioners in financial markets. The profitable ability and efficiency of technical trading rules are yet controversial. In this paper, we test the performance of more than seven thousand traditional technical trading rules on the Shanghai Securities Composite Index (SSCI) from May 21, 1992 through June 30, 2013 and China Securities Index 300 (CSI 300) from April 8, 2005 through June 30, 2013 to check whether an effective trading strategy could be found by using the performance measurements based on the return and Sharpe ratio. To correct for the influence of the data-snooping effect, we adopt the Superior Predictive Ability test to evaluate if there exists a trading rule that can significantly outperform the benchmark. The result shows that for SSCI, technical trading rules offer significant profitability, while for CSI 300, this ability is lost. We further partition the SSCI into two sub-series and find that the efficiency of technical trading in sub-series, which have exactly the same spanning period as that of CSI 300, is severely weakened. By testing the trading rules on both indexes with a five-year moving window, we find that during the financial bubble from 2005 to 2007, the effectiveness of technical trading rules is greatly improved. This is consistent with the predictive ability of technical trading rules which appears when the market is less efficient.

  13. Effects of Performance-Based Financial Incentives on Work Performance: A Study of Technical-Level Employees in the Private Sector in Sri Lanka

    ERIC Educational Resources Information Center

    Wickramasinghe, Vathsala; Dabere, Sampath

    2012-01-01

    The objective of the study is to investigate the effect of performance-based financial incentives on work performance. The study hypothesized that the design features of performance-based financial incentive schemes themselves may influence individuals' work performance. For the study, survey methodology was used and 93 technical-level employees…

  14. Space network scheduling benchmark: A proof-of-concept process for technology transfer

    NASA Technical Reports Server (NTRS)

    Moe, Karen; Happell, Nadine; Hayden, B. J.; Barclay, Cathy

    1993-01-01

    This paper describes a detailed proof-of-concept activity to evaluate flexible scheduling technology as implemented in the Request Oriented Scheduling Engine (ROSE) and applied to Space Network (SN) scheduling. The criteria developed for an operational evaluation of a reusable scheduling system is addressed including a methodology to prove that the proposed system performs at least as well as the current system in function and performance. The improvement of the new technology must be demonstrated and evaluated against the cost of making changes. Finally, there is a need to show significant improvement in SN operational procedures. Successful completion of a proof-of-concept would eventually lead to an operational concept and implementation transition plan, which is outside the scope of this paper. However, a high-fidelity benchmark using actual SN scheduling requests has been designed to test the ROSE scheduling tool. The benchmark evaluation methodology, scheduling data, and preliminary results are described.

  15. Incremental Scheduling Engines for Human Exploration of the Cosmos

    NASA Technical Reports Server (NTRS)

    Jaap, John; Phillips, Shaun

    2005-01-01

    As humankind embarks on longer space missions farther from home, the requirements and environments for scheduling the activities performed on these missions are changing. As we begin to prepare for these missions it is appropriate to evaluate the merits and applicability of the different types of scheduling engines. Scheduling engines temporally arrange tasks onto a timeline so that all constraints and objectives are met and resources are not overbooked. Scheduling engines used to schedule space missions fall into three general categories: batch, mixed-initiative, and incremental. This paper presents an assessment of the engine types, a discussion of the impact of human exploration of the moon and Mars on planning and scheduling, and the applicability of the different types of scheduling engines. This paper will pursue the hypothesis that incremental scheduling engines may have a place in the new environment; they have the potential to reduce cost, to improve the satisfaction of those who execute or benefit from a particular timeline (the customers), and to allow astronauts to plan their own tasks and those of their companion robots.

  16. Simulator training and non-technical factors improve laparoscopic performance among OBGYN trainees.

    PubMed

    Ahlborg, Liv; Hedman, Leif; Nisell, Henry; Felländer-Tsai, Li; Enochsson, Lars

    2013-10-01

    To investigate how simulator training and non-technical factors affect laparoscopic performance among residents in obstetrics and gynecology. In this prospective study, trainees were randomized into three groups. The first group was allocated to proficiency-based training in the LapSimGyn(®) virtual reality simulator. The second group received additional structured mentorship during subsequent laparoscopies. The third group served as control group. At baseline an operation was performed and visuospatial ability, flow and self-efficacy were assessed. All groups subsequently performed three tubal occlusions. Self-efficacy and flow were assessed before and/or after each operation. Simulator training was conducted at the Center for Advanced Medical Simulation and Training, Karolinska University Hospital. Sterilizations were performed at each trainee's home clinic. Twenty-eight trainees/residents from 21 hospitals in Sweden were included. Visuospatial ability was tested by the Mental Rotation Test-A. Flow and self-efficacy were assessed by validated scales and questionnaires. Laparoscopic performance was measured as the duration of surgery. Visuospatial ability, self-efficacy and flow were correlated to the laparoscopic performance using Spearman's correlations. Differences between groups were analyzed by the Mann-Whitney U-test. No differences across groups were detected at baseline. Self-efficacy scores before and flow scores after the third operation were significantly higher in the trained groups. Duration of surgery was significantly shorter in the trained groups. Flow and self-efficacy correlate positively with laparoscopic performance. Simulator training and non-technical factors appear to improve the laparoscopic performance among trainees/residents in obstetrics and gynecology. © 2013 Nordic Federation of Societies of Obstetrics and Gynecology.

  17. Decision-theoretic control of EUVE telescope scheduling

    NASA Technical Reports Server (NTRS)

    Hansson, Othar; Mayer, Andrew

    1993-01-01

    This paper describes a decision theoretic scheduler (DTS) designed to employ state-of-the-art probabilistic inference technology to speed the search for efficient solutions to constraint-satisfaction problems. Our approach involves assessing the performance of heuristic control strategies that are normally hard-coded into scheduling systems and using probabilistic inference to aggregate this information in light of the features of a given problem. The Bayesian Problem-Solver (BPS) introduced a similar approach to solving single agent and adversarial graph search patterns yielding orders-of-magnitude improvement over traditional techniques. Initial efforts suggest that similar improvements will be realizable when applied to typical constraint-satisfaction scheduling problems.

  18. Sleep and cognitive performance of African-Americans and European-Americans before and during circadian misalignment produced by an abrupt 9-h delay in the sleep/wake schedule

    PubMed Central

    Crowley, Stephanie J.; Eastman, Charmane I.

    2017-01-01

    We conducted two studies of circadian misalignment in non-Hispanic African and European-Americans. In the first, the sleep/wake (light/dark) schedule was advanced 9 h, similar to flying east, and in the second these schedules were delayed 9 h, similar to flying west or sleeping during the day after night work. We confirmed that the free-running circadian period is shorter in African-Americans compared to European-Americans, and found differences in the magnitude and direction of circadian rhythm phase shifts which were related to the circadian period. The sleep and cognitive performance data from the first study (published in this journal) documented the impairment in both ancestry groups due to this extreme circadian misalignment. African-Americans slept less and performed slightly worse during advanced/misaligned days than European-Americans. The current analysis is of sleep and cognitive performance from the second study. Participants were 23 African-Americans and 22 European-Americans (aged 18–44 years). Following four baseline days (8 h time in bed, based on habitual sleep), the sleep/wake schedule was delayed by 9 h for three days. Sleep was monitored using actigraphy. During the last two baseline/aligned days and the first two delayed/misaligned days, beginning 2 h after waking, cognitive performance was assessed every 3 h using the Automated Neuropsychological Assessment Metrics (ANAM) battery. Mixed model ANOVAs assessed the effects of ancestry (African-American or European-American) and condition (baseline/aligned or delayed/misaligned) on sleep and performance. There was decreased sleep and impaired cognitive performance in both ancestry groups during the two delayed/misaligned days relative to baseline/aligned days. Sleep and cognitive performance did not differ between African-Americans and European-Americans during either baseline/aligned or delayed/misaligned days. While our previous work showed that an advance in the sleep/wake schedule impaired

  19. Quantitative imaging biomarkers: a review of statistical methods for technical performance assessment.

    PubMed

    Raunig, David L; McShane, Lisa M; Pennello, Gene; Gatsonis, Constantine; Carson, Paul L; Voyvodic, James T; Wahl, Richard L; Kurland, Brenda F; Schwarz, Adam J; Gönen, Mithat; Zahlmann, Gudrun; Kondratovich, Marina V; O'Donnell, Kevin; Petrick, Nicholas; Cole, Patricia E; Garra, Brian; Sullivan, Daniel C

    2015-02-01

    Technological developments and greater rigor in the quantitative measurement of biological features in medical images have given rise to an increased interest in using quantitative imaging biomarkers to measure changes in these features. Critical to the performance of a quantitative imaging biomarker in preclinical or clinical settings are three primary metrology areas of interest: measurement linearity and bias, repeatability, and the ability to consistently reproduce equivalent results when conditions change, as would be expected in any clinical trial. Unfortunately, performance studies to date differ greatly in designs, analysis method, and metrics used to assess a quantitative imaging biomarker for clinical use. It is therefore difficult or not possible to integrate results from different studies or to use reported results to design studies. The Radiological Society of North America and the Quantitative Imaging Biomarker Alliance with technical, radiological, and statistical experts developed a set of technical performance analysis methods, metrics, and study designs that provide terminology, metrics, and methods consistent with widely accepted metrological standards. This document provides a consistent framework for the conduct and evaluation of quantitative imaging biomarker performance studies so that results from multiple studies can be compared, contrasted, or combined. © The Author(s) 2014 Reprints and permissions: sagepub.co.uk/journalsPermissions.nav.

  20. The GBT Dynamic Scheduling System: A New Scheduling Paradigm

    NASA Astrophysics Data System (ADS)

    O'Neil, K.; Balser, D.; Bignell, C.; Clark, M.; Condon, J.; McCarty, M.; Marganian, P.; Shelton, A.; Braatz, J.; Harnett, J.; Maddalena, R.; Mello, M.; Sessoms, E.

    2009-09-01

    The Robert C. Byrd Green Bank Telescope (GBT) is implementing a new Dynamic Scheduling System (DSS) designed to maximize the observing efficiency of the telescope while ensuring that none of the flexibility and ease of use of the GBT is harmed and that the data quality of observations is not adversely affected. To accomplish this, the GBT DSS is implementing a dynamic scheduling system which schedules observers, rather than running scripts. The DSS works by breaking each project into one or more sessions which have associated observing criteria such as RA, Dec, and frequency. Potential observers may also enter dates when members of their team will not be available for either on-site or remote observing. The scheduling algorithm uses those data, along with the predicted weather, to determine the most efficient schedule for the GBT. The DSS provides all observers at least 24 hours notice of their upcoming observing. In the uncommon (< 20%) case where the actual weather does not match the predictions, a backup project, chosen from the database, is run instead. Here we give an overview of the GBT DSS project, including the ranking and scheduling algorithms for the sessions, the scheduling probabilities generation, the web framework for the system, and an overview of the results from the beta testing which were held from June - September, 2008.

  1. Scheduling for Locality in Shared-Memory Multiprocessors

    DTIC Science & Technology

    1993-05-01

    Submitted in Partial Fulfillment of the Requirements for the Degree ’)iIC Q(JALfryT INSPECTED 5 DOCTOR OF PHILOSOPHY I Accesion For Supervised by NTIS CRAM... architecture on parallel program performance, explain the implications of this trend on popular parallel programming models, and propose system software to 0...decomoosition and scheduling algorithms. I. SUIUECT TERMS IS. NUMBER OF PAGES shared-memory multiprocessors; architecture trends; loop 110 scheduling

  2. Schedule Risk Assessment

    NASA Technical Reports Server (NTRS)

    Smith, Greg

    2003-01-01

    Schedule risk assessments determine the likelihood of finishing on time. Each task in a schedule has a varying degree of probability of being finished on time. A schedule risk assessment quantifies these probabilities by assigning values to each task. This viewgraph presentation contains a flow chart for conducting a schedule risk assessment, and profiles applicable several methods of data analysis.

  3. 77 FR 68891 - Medicare Program; Revisions to Payment Policies Under the Physician Fee Schedule, DME Face-to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-16

    ... Area ICD International Classification of Diseases IMRT Intensity Modulated Radiation Therapy IOM... Stereotactic body radiation therapy SGR Sustainable growth rate TC Technical component TIN Tax identification... Clinical Lab Fee Schedule, which is unaffected by the misvalued code initiative. Radiation therapy centers...

  4. Protocols for distributive scheduling

    NASA Technical Reports Server (NTRS)

    Richards, Stephen F.; Fox, Barry

    1993-01-01

    The increasing complexity of space operations and the inclusion of interorganizational and international groups in the planning and control of space missions lead to requirements for greater communication, coordination, and cooperation among mission schedulers. These schedulers must jointly allocate scarce shared resources among the various operational and mission oriented activities while adhering to all constraints. This scheduling environment is complicated by such factors as the presence of varying perspectives and conflicting objectives among the schedulers, the need for different schedulers to work in parallel, and limited communication among schedulers. Smooth interaction among schedulers requires the use of protocols that govern such issues as resource sharing, authority to update the schedule, and communication of updates. This paper addresses the development and characteristics of such protocols and their use in a distributed scheduling environment that incorporates computer-aided scheduling tools. An example problem is drawn from the domain of space shuttle mission planning.

  5. Vehicle Integrated Performance Analysis, the VIPA Experience: Reconnecting with Technical Integration

    NASA Technical Reports Server (NTRS)

    McGhee, David S.

    2005-01-01

    Today's NASA is facing significant challenges and changes. The Exploration initiative indicates a large increase in projects with limited increase in budget. The Columbia report has criticized NASA for its lack of insight and technical integration impacting its ability to provide safety. The Aldridge report is advocating NASA find new ways of doing business. Very early in the Space Launch Initiative (SLI) program a small team of engineers at MSFC were asked to propose a process for performing a system level assessment of a launch vehicle. The request was aimed primarily at providing insight and making NASA a "smart buyer." Out of this effort the VIPA team was created. The difference between the VIPA effort and many integration attempts is that VIPA focuses on using experienced people from various disciplines and a process which focuses them on a technically integrated assessment. Most previous attempts have focused on developing an all encompassing software tool. In addition, VIPA anchored its process formulation in the experience of its members and in early developmental Space Shuttle experience. The primary reference for this is NASA-TP-2001-210092, "Launch Vehicle Design Process: Characterization, Technical Integration, and Lessons Learned," and discussions with its authors. The foundations of VIPA's process are described. The VIPA team also recognized the need to drive detailed analysis earlier in the design process. Analyses and techniques typically done in later design phases, are brought forward using improved computing technology. The intent is to allow the identification of significant sensitivities, trades, and design issues much earlier in the program. This process is driven by the T-model for Technical Integration described in the aforementioned reference. VIPA's approach to performing system level technical integration is discussed in detail. Proposed definitions are offered to clarify this discussion and the general systems integration dialog. VIPA

  6. Analysis of Issues for Project Scheduling by Multiple, Dispersed Schedulers (distributed Scheduling) and Requirements for Manual Protocols and Computer-based Support

    NASA Technical Reports Server (NTRS)

    Richards, Stephen F.

    1991-01-01

    Although computerized operations have significant gains realized in many areas, one area, scheduling, has enjoyed few benefits from automation. The traditional methods of industrial engineering and operations research have not proven robust enough to handle the complexities associated with the scheduling of realistic problems. To address this need, NASA has developed the computer-aided scheduling system (COMPASS), a sophisticated, interactive scheduling tool that is in wide-spread use within NASA and the contractor community. Therefore, COMPASS provides no explicit support for the large class of problems in which several people, perhaps at various locations, build separate schedules that share a common pool of resources. This research examines the issue of distributing scheduling, as applied to application domains characterized by the partial ordering of tasks, limited resources, and time restrictions. The focus of this research is on identifying issues related to distributed scheduling, locating applicable problem domains within NASA, and suggesting areas for ongoing research. The issues that this research identifies are goals, rescheduling requirements, database support, the need for communication and coordination among individual schedulers, the potential for expert system support for scheduling, and the possibility of integrating artificially intelligent schedulers into a network of human schedulers.

  7. Active Rack Isolation System Program and Technical Status

    NASA Technical Reports Server (NTRS)

    Bushnell, Glenn; Fialho, Ian; Allen, James; Quraishi, Naveed

    2000-01-01

    The Boeing Active Rack Isolation System (ARIS) is one of the means used to isolate acceleration-sensitive scientific experiments from structurally transmitted disturbances aboard the International Space Station. The presentation provides an overview of ARIS and technical issues associated with the development of the active control system. An overview of ARIS analytical models is presented along with recent isolation performance predictions made using these models. Issues associated with commanding and capturing ARIS data are discussed and possible future options based on the ARIS ISS Characterization Experiment (ICE) Payload On-orbit Processor (POP) are outlined. An overview of the ARIS-ICE experiment scheduled to fly on ISS Flight 6A is presented. The presentation concludes with a discussion of recent- developmental work that includes passive rack damping, umbilical redesigns and advanced multivariable control design methods.

  8. Anchorage Arrival Scheduling Under Off-Nominal Weather Conditions

    NASA Technical Reports Server (NTRS)

    Grabbe, Shon; Chan, William N.; Mukherjee, Avijit

    2012-01-01

    Weather can cause flight diversions, passenger delays, additional fuel consumption and schedule disruptions at any high volume airport. The impacts are particularly acute at the Ted Stevens Anchorage International Airport in Anchorage, Alaska due to its importance as a major international portal. To minimize the impacts due to weather, a multi-stage scheduling process is employed that is iteratively executed, as updated aircraft demand and/or airport capacity data become available. The strategic scheduling algorithm assigns speed adjustments for flights that originate outside of Anchorage Center to achieve the proper demand and capacity balance. Similarly, an internal departure-scheduling algorithm assigns ground holds for pre-departure flights that originate from within Anchorage Center. Tactical flight controls in the form of airborne holding are employed to reactively account for system uncertainties. Real-world scenarios that were derived from the January 16, 2012 Anchorage visibility observations and the January 12, 2012 Anchorage arrival schedule were used to test the initial implementation of the scheduling algorithm in fast-time simulation experiments. Although over 90% of the flights in the scenarios arrived at Anchorage without requiring any delay, pre-departure scheduling was the dominant form of control for Anchorage arrivals. Additionally, tactical scheduling was used extensively in conjunction with the pre-departure scheduling to reactively compensate for uncertainties in the arrival demand. For long-haul flights, the strategic scheduling algorithm performed best when the scheduling horizon was greater than 1,000 nmi. With these long scheduling horizons, it was possible to absorb between ten and 12 minutes of delay through speed control alone. Unfortunately, the use of tactical scheduling, which resulted in airborne holding, was found to increase as the strategic scheduling horizon increased because of the additional uncertainty in the arrival times

  9. 77 FR 47047 - Biomass Research and Development Technical Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-07

    ... research and development leading to the production of biobased fuels and biobased products. Tentative... Research and Development Technical Advisory Committee. To attend the meeting and/or to make oral statements... at the beginning of the meeting. Reasonable provision will be made to include the scheduled oral...

  10. Traditional/Block Scheduling, Gender, and Test Scores in College Biology Course

    ERIC Educational Resources Information Center

    Huelskamp, Diana

    2014-01-01

    Block scheduling is the reallocation of a school day into longer class sessions to allow for more active teaching strategies and active engagement of students, in the effort to increase student performance. Various types of block scheduling exist. Traditional scheduling is when the school day is divided into six to eight sessions, with each…

  11. Extended workdays: Effects of 8-hour and 12-hour rotating shift schedules on test performance, subjective alertness, sleep patterns, and psychological variables

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rosa, R.R.; Colligan, M.J.; Lewis, P.

    1986-06-01

    A newly instituted 3 to 4 day/12-hr rotating shift schedule was compared to the previous 5 to 7 day/8-hr schedule using standard laboratory-type measures of performance and alertness, and a questionnaire on sleep patterns and other personal habits. After seven months adaptation to the new schedule, a preliminary analysis indicates that there were some decrements in alertness, reductions in sleep, and disruptions of other personal activities during 12-hr workdays. Gastro-intestinal state improved during night shift, however, and increases in self-reported stress were reduced by the shortened workweek. These results are discussed in terms of trade-offs between longer workdays and shortermore » workweeks. It is emphasized that at this time no determination can be made of the extent of risk associated with these changes in alertness.« less

  12. FALCON: A distributed scheduler for MIMD architectures

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grimshaw, A.S.; Vivas, V.E. Jr.

    1991-01-01

    This paper describes FALCON (Fully Automatic Load COordinator for Networks), the scheduler for the Mentat parallel processing system. FALCON has a modular structure and is designed for systems that use a task scheduling mechanism. FALCON is distributed, stable, supports system heterogeneities, and employs a sender-initiated adaptive load sharing policy with static task assignment. FALCON is parameterizable and is implemented in Mentat, a working distributed system. We present the design and implementation of FALCON as well as a brief introduction to those features of the Mentat run-time system that influence FALCON. Performance measures under different scheduler configurations are also presented andmore » analyzed with respect to the system parameters. 36 refs., 8 figs.« less

  13. Linux Kernel Co-Scheduling For Bulk Synchronous Parallel Applications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jones, Terry R

    2011-01-01

    This paper describes a kernel scheduling algorithm that is based on co-scheduling principles and that is intended for parallel applications running on 1000 cores or more where inter-node scalability is key. Experimental results for a Linux implementation on a Cray XT5 machine are presented.1 The results indicate that Linux is a suitable operating system for this new scheduling scheme, and that this design provides a dramatic improvement in scaling performance for synchronizing collective operations at scale.

  14. Research on a Queue Scheduling Algorithm in Wireless Communications Network

    NASA Astrophysics Data System (ADS)

    Yang, Wenchuan; Hu, Yuanmei; Zhou, Qiancai

    This paper proposes a protocol QS-CT, Queue Scheduling Mechanism based on Multiple Access in Ad hoc net work, which adds queue scheduling mechanism to RTS-CTS-DATA using multiple access protocol. By endowing different queues different scheduling mechanisms, it makes networks access to the channel much more fairly and effectively, and greatly enhances the performance. In order to observe the final performance of the network with QS-CT protocol, we simulate it and compare it with MACA/C-T without QS-CT protocol. Contrast to MACA/C-T, the simulation result shows that QS-CT has greatly improved the throughput, delay, rate of packets' loss and other key indicators.

  15. Escalator: An Autonomous Scheduling Scheme for Convergecast in TSCH.

    PubMed

    Oh, Sukho; Hwang, DongYeop; Kim, Ki-Hyung; Kim, Kangseok

    2018-04-16

    Time Slotted Channel Hopping (TSCH) is widely used in the industrial wireless sensor networks due to its high reliability and energy efficiency. Various timeslot and channel scheduling schemes have been proposed for achieving high reliability and energy efficiency for TSCH networks. Recently proposed autonomous scheduling schemes provide flexible timeslot scheduling based on the routing topology, but do not take into account the network traffic and packet forwarding delays. In this paper, we propose an autonomous scheduling scheme for convergecast in TSCH networks with RPL as a routing protocol, named Escalator. Escalator generates a consecutive timeslot schedule along the packet forwarding path to minimize the packet transmission delay. The schedule is generated autonomously by utilizing only the local routing topology information without any additional signaling with other nodes. The generated schedule is guaranteed to be conflict-free, in that all nodes in the network could transmit packets to the sink in every slotframe cycle. We implement Escalator and evaluate its performance with existing autonomous scheduling schemes through a testbed and simulation. Experimental results show that the proposed Escalator has lower end-to-end delay and higher packet delivery ratio compared to the existing schemes regardless of the network topology.

  16. SOFIA'S Challenge: Scheduling Airborne Astronomy Observations

    NASA Technical Reports Server (NTRS)

    Frank, Jeremy

    2005-01-01

    The Stratospheric Observatory for Infrared Astronomy (SOFIA) is NASA's next generation airborne astronomical observatory, and will commence operations in 2005. The facility consists of a 747-SP modified to accommodate a 2.5 meter telescope. SOFIA is expected to fly an average of 140 science flights per year over its 20 year lifetime. Depending on the nature of the instrument used during flight, 5-15 observations per flight are expected. The SOFIA telescope is mounted aft of the wings on the port side of the aircraft and is articulated through a range of 20deg to 60deg of elevation. The telescope has minimal lateral flexibility; thus, the aircraft must turn constantly to maintain the telescope's focus on an object during observations. A significant problem in future SOFIA operations is that of scheduling flights in support of observations. Investigators are expected to propose small numbers of observations, and many observations must be grouped together to make up single flights. Flight planning for the previous generation airborne observatory, the Kuiper Airborne Observatory (KAO), was done by hand; planners had to choose takeoff time, observations to perform, and decide on setup-actions (called "dead-legs") to position the aircraft prior to observing. This task frequently required between 6-8 hours to plan one flight The scope of the flight planning problem for supporting GI observations with the anticipated flight rate for SOFIA makes the manual approach for flight planning daunting. In response, we have designed an Automated Flight Planner (AFP) that accepts as input a set of requested observations, designated flight days, weather predictions and fuel limitations, and searches automatically for high-quality flight plans that satisfy all relevant aircraft and astronomer specified constraints. The AFP can generate one candidate flight plan in 5-10 minutes, of computation time, a feat beyond the capabilities of human flight planners. The rate at which the AFP can

  17. On scheduling task systems with variable service times

    NASA Astrophysics Data System (ADS)

    Maset, Richard G.; Banawan, Sayed A.

    1993-08-01

    Several strategies have been proposed for developing optimal and near-optimal schedules for task systems (jobs consisting of multiple tasks that can be executed in parallel). Most such strategies, however, implicitly assume deterministic task service times. We show that these strategies are much less effective when service times are highly variable. We then evaluate two strategies—one adaptive, one static—that have been proposed for retaining high performance despite such variability. Both strategies are extensions of critical path scheduling, which has been found to be efficient at producing near-optimal schedules. We found the adaptive approach to be quite effective.

  18. 32 CFR 37.895 - How is the final performance report to be sent to the Defense Technical Information Center?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... How is the final performance report to be sent to the Defense Technical Information Center? (a... 32 National Defense 1 2014-07-01 2014-07-01 false How is the final performance report to be sent to the Defense Technical Information Center? 37.895 Section 37.895 National Defense Department of...

  19. 32 CFR 37.895 - How is the final performance report to be sent to the Defense Technical Information Center?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... How is the final performance report to be sent to the Defense Technical Information Center? (a... 32 National Defense 1 2011-07-01 2011-07-01 false How is the final performance report to be sent to the Defense Technical Information Center? 37.895 Section 37.895 National Defense Department of...

  20. 32 CFR 37.895 - How is the final performance report to be sent to the Defense Technical Information Center?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... How is the final performance report to be sent to the Defense Technical Information Center? (a... 32 National Defense 1 2013-07-01 2013-07-01 false How is the final performance report to be sent to the Defense Technical Information Center? 37.895 Section 37.895 National Defense Department of...

  1. 32 CFR 37.895 - How is the final performance report to be sent to the Defense Technical Information Center?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 1 2012-07-01 2012-07-01 false How is the final performance report to be sent to the Defense Technical Information Center? 37.895 Section 37.895 National Defense Department of... How is the final performance report to be sent to the Defense Technical Information Center? (a...

  2. Improved Scheduling Mechanisms for Synchronous Information and Energy Transmission.

    PubMed

    Qin, Danyang; Yang, Songxiang; Zhang, Yan; Ma, Jingya; Ding, Qun

    2017-06-09

    Wireless energy collecting technology can effectively reduce the network time overhead and prolong the wireless sensor network (WSN) lifetime. However, the traditional energy collecting technology cannot achieve the balance between ergodic channel capacity and average collected energy. In order to solve the problem of the network transmission efficiency and the limited energy of wireless devices, three improved scheduling mechanisms are proposed: improved signal noise ratio (SNR) scheduling mechanism (IS2M), improved N-SNR scheduling mechanism (INS2M) and an improved Equal Throughput scheduling mechanism (IETSM) for different channel conditions to improve the whole network performance. Meanwhile, the average collected energy of single users and the ergodic channel capacity of three scheduling mechanisms can be obtained through the order statistical theory in Rayleig, Ricean, Nakagami- m and Weibull fading channels. It is concluded that the proposed scheduling mechanisms can achieve better balance between energy collection and data transmission, so as to provide a new solution to realize synchronous information and energy transmission for WSNs.

  3. ESSOPE: Towards S/C operations with reactive schedule planning

    NASA Technical Reports Server (NTRS)

    Wheadon, J.

    1993-01-01

    The ESSOPE is a prototype front-end tool running on a Sun workstation and interfacing to ESOC's MSSS spacecraft control system for the exchange of telecommand requests (to MSSS) and telemetry reports (from MSSS). ESSOPE combines an operations Planner-Scheduler, with a Schedule Execution Control function. Using an internal 'model' of the spacecraft, the Planner generates a schedule based on utilization requests for a variety of payload services by a community of Olympus users, and incorporating certain housekeeping operations. Conflicts based on operational constraints are automatically resolved, by employing one of several available strategies. The schedule is passed to the execution function which drives MSSS to perform it. When the schedule can no longer be met, either because the operator interferes (by delays or changes of requirements), or because ESSOPE has recognized some spacecraft anomalies, the Planner produces a modified schedule maintaining the on-going procedures as far as consistent with the new constraints or requirements.

  4. Improved Scheduling Mechanisms for Synchronous Information and Energy Transmission

    PubMed Central

    Qin, Danyang; Yang, Songxiang; Zhang, Yan; Ma, Jingya; Ding, Qun

    2017-01-01

    Wireless energy collecting technology can effectively reduce the network time overhead and prolong the wireless sensor network (WSN) lifetime. However, the traditional energy collecting technology cannot achieve the balance between ergodic channel capacity and average collected energy. In order to solve the problem of the network transmission efficiency and the limited energy of wireless devices, three improved scheduling mechanisms are proposed: improved signal noise ratio (SNR) scheduling mechanism (IS2M), improved N-SNR scheduling mechanism (INS2M) and an improved Equal Throughput scheduling mechanism (IETSM) for different channel conditions to improve the whole network performance. Meanwhile, the average collected energy of single users and the ergodic channel capacity of three scheduling mechanisms can be obtained through the order statistical theory in Rayleig, Ricean, Nakagami-m and Weibull fading channels. It is concluded that the proposed scheduling mechanisms can achieve better balance between energy collection and data transmission, so as to provide a new solution to realize synchronous information and energy transmission for WSNs. PMID:28598395

  5. Simulation fails to replicate stress in trainees performing a technical procedure in the clinical environment.

    PubMed

    Baker, B G; Bhalla, A; Doleman, B; Yarnold, E; Simons, S; Lund, J N; Williams, J P

    2017-01-01

    Simulation-based training (SBT) has become an increasingly important method by which doctors learn. Stress has an impact upon learning, performance, technical, and non-technical skills. However, there are currently no studies that compare stress in the clinical and simulated environment. We aimed to compare objective (heart rate variability, HRV) and subjective (state trait anxiety inventory, STAI) measures of stress theatre with a simulated environment. HRV recordings were obtained from eight anesthetic trainees performing an uncomplicated rapid sequence induction at pre-determined procedural steps using a wireless Polar RS800CX monitor © in an emergency theatre setting. This was repeated in the simulated environment. Participants completed an STAI before and after the procedure. Eight trainees completed the study. The theatre environment caused an increase in objective stress vs baseline (p = .004). There was no significant difference between average objective stress levels across all time points (p = .20) between environments. However, there was a significant interaction between the variables of objective stress and environment (p = .045). There was no significant difference in subjective stress (p = .27) between environments. Simulation was unable to accurately replicate the stress of the technical procedure. This is the first study that compares the stress during SBT with the theatre environment and has implications for the assessment of simulated environments for use in examinations, rating of technical and non-technical skills, and stress management training.

  6. Multi-Objective Approach for Energy-Aware Workflow Scheduling in Cloud Computing Environments

    PubMed Central

    Kadima, Hubert; Granado, Bertrand

    2013-01-01

    We address the problem of scheduling workflow applications on heterogeneous computing systems like cloud computing infrastructures. In general, the cloud workflow scheduling is a complex optimization problem which requires considering different criteria so as to meet a large number of QoS (Quality of Service) requirements. Traditional research in workflow scheduling mainly focuses on the optimization constrained by time or cost without paying attention to energy consumption. The main contribution of this study is to propose a new approach for multi-objective workflow scheduling in clouds, and present the hybrid PSO algorithm to optimize the scheduling performance. Our method is based on the Dynamic Voltage and Frequency Scaling (DVFS) technique to minimize energy consumption. This technique allows processors to operate in different voltage supply levels by sacrificing clock frequencies. This multiple voltage involves a compromise between the quality of schedules and energy. Simulation results on synthetic and real-world scientific applications highlight the robust performance of the proposed approach. PMID:24319361

  7. Multi-objective approach for energy-aware workflow scheduling in cloud computing environments.

    PubMed

    Yassa, Sonia; Chelouah, Rachid; Kadima, Hubert; Granado, Bertrand

    2013-01-01

    We address the problem of scheduling workflow applications on heterogeneous computing systems like cloud computing infrastructures. In general, the cloud workflow scheduling is a complex optimization problem which requires considering different criteria so as to meet a large number of QoS (Quality of Service) requirements. Traditional research in workflow scheduling mainly focuses on the optimization constrained by time or cost without paying attention to energy consumption. The main contribution of this study is to propose a new approach for multi-objective workflow scheduling in clouds, and present the hybrid PSO algorithm to optimize the scheduling performance. Our method is based on the Dynamic Voltage and Frequency Scaling (DVFS) technique to minimize energy consumption. This technique allows processors to operate in different voltage supply levels by sacrificing clock frequencies. This multiple voltage involves a compromise between the quality of schedules and energy. Simulation results on synthetic and real-world scientific applications highlight the robust performance of the proposed approach.

  8. Automated telescope scheduling

    NASA Technical Reports Server (NTRS)

    Johnston, Mark D.

    1988-01-01

    With the ever increasing level of automation of astronomical telescopes the benefits and feasibility of automated planning and scheduling are becoming more apparent. Improved efficiency and increased overall telescope utilization are the most obvious goals. Automated scheduling at some level has been done for several satellite observatories, but the requirements on these systems were much less stringent than on modern ground or satellite observatories. The scheduling problem is particularly acute for Hubble Space Telescope: virtually all observations must be planned in excruciating detail weeks to months in advance. Space Telescope Science Institute has recently made significant progress on the scheduling problem by exploiting state-of-the-art artificial intelligence software technology. What is especially interesting is that this effort has already yielded software that is well suited to scheduling groundbased telescopes, including the problem of optimizing the coordinated scheduling of more than one telescope.

  9. Contribution of Schedule Delays to Cost Growth: How to Make Peace with a Marching Army

    NASA Technical Reports Server (NTRS)

    Majerowicz, Walt; Bitten, Robert; Emmons, Debra; Shinn, Stephen A.

    2016-01-01

    Numerous research papers have shown that cost and schedule growth are interrelated for NASA space science missions. Although there has shown to be a strong correlation of cost growth with schedule growth, it is unclear what percentage of cost growth is caused by schedule growth and how schedule growth can be controlled. This paper attempts to quantify this percentage by looking at historical data and show detailed examples of how schedule growth influences cost growth. The paper also addresses a methodology to show an alternate approach for assessing and setting a robust baseline schedule and use schedule performance metrics to help assess if the project is performing to plan. Finally, recommendations are presented to help control schedule growth in order to minimize cost growth for NASA space science missions.

  10. Optimization Models for Scheduling of Jobs

    PubMed Central

    Indika, S. H. Sathish; Shier, Douglas R.

    2006-01-01

    This work is motivated by a particular scheduling problem that is faced by logistics centers that perform aircraft maintenance and modification. Here we concentrate on a single facility (hangar) which is equipped with several work stations (bays). Specifically, a number of jobs have already been scheduled for processing at the facility; the starting times, durations, and work station assignments for these jobs are assumed to be known. We are interested in how best to schedule a number of new jobs that the facility will be processing in the near future. We first develop a mixed integer quadratic programming model (MIQP) for this problem. Since the exact solution of this MIQP formulation is time consuming, we develop a heuristic procedure, based on existing bin packing techniques. This heuristic is further enhanced by application of certain local optimality conditions. PMID:27274921

  11. A Comparison of Physical and Technical Performance Profiles Between Successful and Less-Successful Professional Rugby League Teams.

    PubMed

    Kempton, Thomas; Sirotic, Anita C; Coutts, Aaron J

    2017-04-01

    To examine differences in physical and technical performance profiles using a large sample of match observations drawn from successful and less-successful professional rugby league teams. Match activity profiles were collected using global positioning satellite (GPS) technology from 29 players from a successful rugby league team during 24 games and 25 players from a less-successful team during 18 games throughout 2 separate competition seasons. Technical performance data were obtained from a commercial statistics provider. A progressive magnitude-based statistical approach was used to compare differences in physical and technical performance variables between the reference teams. There were no clear differences in playing time, absolute and relative total distances, or low-speed running distances between successful and less-successful teams. The successful team possibly to very likely had lower higher-speed running demands and likely had fewer physical collisions than the less-successful team, although they likely to most likely demonstrated more accelerations and decelerations and likely had higher average metabolic power. The successful team very likely gained more territory in attack, very likely had more possessions, and likely committed fewer errors. In contrast, the less-successful team was likely required to attempt more tackles, most likely missed more tackles, and very likely had a lower effective tackle percentage. In the current study, successful match performance was not contingent on higher match running outputs or more physical collisions; rather, proficiency in technical performance components better differentiated successful and less-successful teams.

  12. A Comparison of Techniques for Scheduling Fleets of Earth-Observing Satellites

    NASA Technical Reports Server (NTRS)

    Globus, Al; Crawford, James; Lohn, Jason; Pryor, Anna

    2003-01-01

    Earth observing satellite (EOS) scheduling is a complex real-world domain representative of a broad class of over-subscription scheduling problems. Over-subscription problems are those where requests for a facility exceed its capacity. These problems arise in a wide variety of NASA and terrestrial domains and are .XI important class of scheduling problems because such facilities often represent large capital investments. We have run experiments comparing multiple variants of the genetic algorithm, hill climbing, simulated annealing, squeaky wheel optimization and iterated sampling on two variants of a realistically-sized model of the EOS scheduling problem. These are implemented as permutation-based methods; methods that search in the space of priority orderings of observation requests and evaluate each permutation by using it to drive a greedy scheduler. Simulated annealing performs best and random mutation operators outperform our squeaky (more intelligent) operator. Furthermore, taking smaller steps towards the end of the search improves performance.

  13. Web Publishing Schedule

    EPA Pesticide Factsheets

    Section 207(f)(2) of the E-Gov Act requires federal agencies to develop an inventory and establish a schedule of information to be published on their Web sites, make those schedules available for public comment. To post the schedules on the web site.

  14. An investigation on impacts of scheduling configurations on Mississippi biology subject area testing

    NASA Astrophysics Data System (ADS)

    Marchette, Frances Lenora

    The purpose of this mixed modal study was to compare the results of Biology Subject Area mean scores of students on a 4 x 4 block schedule, A/B block schedule, and traditional year-long schedule for 1A to 5A size schools. This study also reviewed the data to determine if minority or gender issues might influence the test results. Interviews with administrators and teachers were conducted about the type of schedule configuration they use and the influence that the schedule has on student academic performance on the Biology Subject Area Test. Additionally, this research further explored whether schedule configurations allow sufficient time for students to construct knowledge. This study is important to schools, teachers, and administrators because it can assist them in considering the impacts that different types of class schedules have on student performance and if ethnic or gender issues are influencing testing results. This study used the causal-comparative method for the quantitative portion of the study and constant comparative method for the qualitative portion to explore the relationship of school schedules on student academic achievement on the Mississippi Biology Subject Area Test. The aggregate means of selected student scores indicate that the Mississippi Biology Subject Area Test as a measure of student performance reveals no significant difference on student achievement for the three school schedule configurations. The data were adjusted for initial differences of gender, minority, and school size on the three schedule configurations. The results suggest that schools may employ various schedule configurations and expect student performance on the Mississippi Biology Subject Area Test to be unaffected. However, many areas of concern were identified in the interviews that might impact on school learning environments. These concerns relate to effective classroom management, the active involvement of students in learning, the adequacy of teacher education

  15. Evaluation of Scheduling Methods for Multiple Runways

    NASA Technical Reports Server (NTRS)

    Bolender, Michael A.; Slater, G. L.

    1996-01-01

    Several scheduling strategies are analyzed in order to determine the most efficient means of scheduling aircraft when multiple runways are operational and the airport is operating at different utilization rates. The study compares simulation data for two and three runway scenarios to results from queuing theory for an M/D/n queue. The direction taken, however, is not to do a steady-state, or equilibrium, analysis since this is not the case during a rush period at a typical airport. Instead, a transient analysis of the delay per aircraft is performed. It is shown that the scheduling strategy that reduces the delay depends upon the density of the arrival traffic. For light traffic, scheduling aircraft to their preferred runways is sufficient; however, as the arrival rate increases, it becomes more important to separate traffic by weight class. Significant delay reduction is realized when aircraft that belong to the heavy and small weight classes are sent to separate runways with large aircraft put into the 'best' landing slot.

  16. Pulsed Lidar Performance/Technical Maturity Assessment

    NASA Technical Reports Server (NTRS)

    Gimmestad, Gary G.; West, Leanne L.; Wood, Jack W.; Frehlich, Rod

    2004-01-01

    This report describes the results of investigations performed by the Georgia Tech Research Institute (GTRI) and the National Center for Atmospheric Research (NCAR) under a task entitled 'Pulsed Lidar Performance/Technical Maturity Assessment' funded by the Crew Systems Branch of the Airborne Systems Competency at the NASA Langley Research Center. The investigations included two tasks, 1.1(a) and 1.1(b). The Tasks discussed in this report are in support of the NASA Virtual Airspace Modeling and Simulation (VAMS) program and are designed to evaluate a pulsed lidar that will be required for active wake vortex avoidance solutions. The Coherent Technologies, Inc. (CTI) WindTracer LIDAR is an eye-safe, 2-micron, coherent, pulsed Doppler lidar with wake tracking capability. The actual performance of the WindTracer system was to be quantified. In addition, the sensor performance has been assessed and modeled, and the models have been included in simulation efforts. The WindTracer LIDAR was purchased by the Federal Aviation Administration (FAA) for use in near-term field data collection efforts as part of a joint NASA/FAA wake vortex research program. In the joint research program, a minimum common wake and weather data collection platform will be defined. NASA Langley will use the field data to support wake model development and operational concept investigation in support of the VAMS project, where the ultimate goal is to improve airport capacity and safety. Task 1.1(a), performed by NCAR in Boulder, Colorado to analyze the lidar system to determine its performance and capabilities based on results from simulated lidar data with analytic wake vortex models provided by NASA, which were then compared to the vendor's claims for the operational specifications of the lidar. Task 1.1(a) is described in Section 3, including the vortex model, lidar parameters and simulations, and results for both detection and tracking of wake vortices generated by Boeing 737s and 747s. Task 1

  17. Schedule Risk Assessment

    NASA Technical Reports Server (NTRS)

    Smith, Greg

    2003-01-01

    Schedule Risk Assessment needs to determine the probability of finishing on or before a given point in time. Task in a schedule should reflect the "most likely" duration for each task. IN reality, each task is different and has a varying degree of probability of finishing within or after the duration specified. Schedule risk assessment attempt to quantify these probabilities by assigning values to each task. Bridges the gap between CPM scheduling and the project's need to know the likelihood of "when".

  18. Robotic acquisition programs: technical and performance challenges

    NASA Astrophysics Data System (ADS)

    Thibadoux, Steven A.

    2002-07-01

    The Unmanned Ground Vehicles/ Systems Joint Project Office (UGV/S JPO) is developing and fielding a variety of tactical robotic systems for the Army and Marine Corps. The Standardized Robotic System (SRS) provides a family of common components that can be installed in existing military vehicles, to allow unmanned operation of the vehicle and its payloads. The Robotic Combat Support System (RCSS) will be a medium sized unmanned system with interchangeable attachments, allowing a remote operator to perform a variety of engineering tasks. The Gladiator Program is a USMC initiative for a small to medium sized, highly mobile UGV to conduct scout/ surveillance missions and to carry various lethal and non-lethal payloads. Acquisition plans for these programs require preplanned evolutionary block upgrades to add operational capability, as new technology becomes available. This paper discusses technical and performance issues that must be resolved and the enabling technologies needed for near term block upgrades of these first generation robotic systems. Additionally, two Joint Robotics Program (JRP) initiatives, Robotic Acquisition through Virtual Environments and Networked Simulations (RAVENS) and Joint Architecture for Unmanned Ground Systems (JAUGS), will be discussed. RAVENS and JAUGS will be used to efficiently evaluate and integrate new technologies to be incorporated in system upgrades.

  19. New Scheduling Algorithms for Agile All-Photonic Networks

    NASA Astrophysics Data System (ADS)

    Mehri, Mohammad Saleh; Ghaffarpour Rahbar, Akbar

    2017-12-01

    An optical overlaid star network is a class of agile all-photonic networks that consists of one or more core node(s) at the center of the star network and a number of edge nodes around the core node. In this architecture, a core node may use a scheduling algorithm for transmission of traffic through the network. A core node is responsible for scheduling optical packets that arrive from edge nodes and switching them toward their destinations. Nowadays, most edge nodes use virtual output queue (VOQ) architecture for buffering client packets to achieve high throughput. This paper presents two efficient scheduling algorithms called discretionary iterative matching (DIM) and adaptive DIM. These schedulers find maximum matching in a small number of iterations and provide high throughput and incur low delay. The number of arbiters in these schedulers and the number of messages exchanged between inputs and outputs of a core node are reduced. We show that DIM and adaptive DIM can provide better performance in comparison with iterative round-robin matching with SLIP (iSLIP). SLIP means the act of sliding for a short distance to select one of the requested connections based on the scheduling algorithm.

  20. Application of objective clinical human reliability analysis (OCHRA) in assessment of technical performance in laparoscopic rectal cancer surgery.

    PubMed

    Foster, J D; Miskovic, D; Allison, A S; Conti, J A; Ockrim, J; Cooper, E J; Hanna, G B; Francis, N K

    2016-06-01

    Laparoscopic rectal resection is technically challenging, with outcomes dependent upon technical performance. No robust objective assessment tool exists for laparoscopic rectal resection surgery. This study aimed to investigate the application of the objective clinical human reliability analysis (OCHRA) technique for assessing technical performance of laparoscopic rectal surgery and explore the validity and reliability of this technique. Laparoscopic rectal cancer resection operations were described in the format of a hierarchical task analysis. Potential technical errors were defined. The OCHRA technique was used to identify technical errors enacted in videos of twenty consecutive laparoscopic rectal cancer resection operations from a single site. The procedural task, spatial location, and circumstances of all identified errors were logged. Clinical validity was assessed through correlation with clinical outcomes; reliability was assessed by test-retest. A total of 335 execution errors identified, with a median 15 per operation. More errors were observed during pelvic tasks compared with abdominal tasks (p < 0.001). Within the pelvis, more errors were observed during dissection on the right side than the left (p = 0.03). Test-retest confirmed reliability (r = 0.97, p < 0.001). A significant correlation was observed between error frequency and mesorectal specimen quality (r s = 0.52, p = 0.02) and with blood loss (r s = 0.609, p = 0.004). OCHRA offers a valid and reliable method for evaluating technical performance of laparoscopic rectal surgery.

  1. Analysis of Running and Technical Performance in Substitute Players in International Male Rugby Union Competition.

    PubMed

    Lacome, Mathieu; Piscione, Julien; Hager, Jean-Philippe; Carling, Christopher

    2016-09-01

    To investigate the patterns and performance of substitutions in 18 international 15-a-side men's rugby union matches. A semiautomatic computerized time-motion system compiled 750 performance observations for 375 players (422 forwards, 328 backs). Running and technical-performance measures included total distance run, high-intensity running (>18.0 km/h), number of individual ball possessions and passes, percentage of passes completed, and number of attempted and percentage of successful tackles. A total of 184 substitutions (85.2%) were attributed to tactical and 32 (14.8%) to injury purposes respectively. The mean period for non-injury-purpose substitutions in backs (17.7%) occurred between 70 and 75 min, while forward substitutions peaked equally between 50-55 and 60-65 min (16.4%). Substitutes generally demonstrated improved running performance compared with both starter players who completed games and players whom they replaced (small differences, ES -0.2 to 0.5) in both forwards and backs over their entire time played. There was also a trend for better running performance in forward and back substitutes over their first 10 min of play compared with the final 10 min for replaced players (small to moderate differences, ES 0.3-0.6). Finally, running performance in both forward and back substitutes was generally lower (ES -0.1 to 0.3, unclear or small differences) over their entire 2nd-half time played compared with their first 10 min of play. The impact of substitutes on technical performance was generally considered unclear. This information provides practitioners with practical data relating to the physical and technical contributions of substitutions that subsequently could enable optimization of their impact on match play.

  2. Switching State-Feedback LPV Control with Uncertain Scheduling Parameters

    NASA Technical Reports Server (NTRS)

    He, Tianyi; Al-Jiboory, Ali Khudhair; Swei, Sean Shan-Min; Zhu, Guoming G.

    2017-01-01

    This paper presents a new method to design Robust Switching State-Feedback Gain-Scheduling (RSSFGS) controllers for Linear Parameter Varying (LPV) systems with uncertain scheduling parameters. The domain of scheduling parameters are divided into several overlapped subregions to undergo hysteresis switching among a family of simultaneously designed LPV controllers over the corresponding subregion with the guaranteed H-infinity performance. The synthesis conditions are given in terms of Parameterized Linear Matrix Inequalities that guarantee both stability and performance at each subregion and associated switching surfaces. The switching stability is ensured by descent parameter-dependent Lyapunov function on switching surfaces. By solving the optimization problem, RSSFGS controller can be obtained for each subregion. A numerical example is given to illustrate the effectiveness of the proposed approach over the non-switching controllers.

  3. Status Report on the Development of Micro-Scheduling Software for the Advanced Outage Control Center Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Germain, Shawn St.; Thomas, Kenneth; Farris, Ronald

    2014-09-01

    The long-term viability of existing nuclear power plants (NPPs) in the United States (U.S.) is dependent upon a number of factors, including maintaining high capacity factors, maintaining nuclear safety, and reducing operating costs, particularly those associated with refueling outages. Refueling outages typically take 20-30 days, and for existing light water NPPs in the U.S., the reactor cannot be in operation during the outage. Furthermore, given that many NPPs generate between $1-1.5 million/day in revenue when in operation, there is considerable interest in shortening the length of refueling outages. Yet, refueling outages are highly complex operations, involving multiple concurrent and dependentmore » activities that are difficult to coordinate. Finding ways to improve refueling outage performance while maintaining nuclear safety has proven to be difficult. The Advanced Outage Control Center project is a research and development (R&D) demonstration activity under the Light Water Reactor Sustainability (LWRS) Program. LWRS is a R&D program which works with industry R&D programs to establish technical foundations for the licensing and managing of long-term, safe, and economical operation of current NPPs. The Advanced Outage Control Center project has the goal of improving the management of commercial NPP refueling outages. To accomplish this goal, this INL R&D project is developing an advanced outage control center (OCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. This report describes specific recent efforts to develop a capability called outage Micro-Scheduling. Micro-Scheduling is the ability to allocate and schedule outage support task resources on a sub-hour basis. Micro-Scheduling is the real-time fine-tuning of the outage schedule to react to the actual progress of the primary outage activities to ensure that support task resources are

  4. Investigating Aerobic, Anaerobic Combine Technical Trainings' Effects on Performance in Tennis Players

    ERIC Educational Resources Information Center

    Suna, Gürhan; Kumartasli, Mehmet

    2017-01-01

    The aim of this study is to investigate eight-week aerobic, anaerobic combine technical trainings' effects on developments of performance. 21 athletes of tennis proficiency students from Sports Sciences Department were joined to the study voluntarily. Participated in the research athletes' ages' mean was 22,2 ± 0,3 year, lengths' mean was 177,3 ±…

  5. Effects of Cocaine on Performance under Fixed-Interval Schedules with a Small Tandem Ratio Requirement

    ERIC Educational Resources Information Center

    Pinkston, Jonathan W.; Branch, Marc N.

    2004-01-01

    Daily administration of cocaine often results in the development of tolerance to its effects on responding maintained by fixed-ratio schedules. Such effects have been observed to be greater when the ratio value is small, whereas less or no tolerance has been observed at large ratio values. Similar schedule-parameter-dependent tolerance, however,…

  6. The serial message-passing schedule for LDPC decoding algorithms

    NASA Astrophysics Data System (ADS)

    Liu, Mingshan; Liu, Shanshan; Zhou, Yuan; Jiang, Xue

    2015-12-01

    The conventional message-passing schedule for LDPC decoding algorithms is the so-called flooding schedule. It has the disadvantage that the updated messages cannot be used until next iteration, thus reducing the convergence speed . In this case, the Layered Decoding algorithm (LBP) based on serial message-passing schedule is proposed. In this paper the decoding principle of LBP algorithm is briefly introduced, and then proposed its two improved algorithms, the grouped serial decoding algorithm (Grouped LBP) and the semi-serial decoding algorithm .They can improve LBP algorithm's decoding speed while maintaining a good decoding performance.

  7. Escalator: An Autonomous Scheduling Scheme for Convergecast in TSCH

    PubMed Central

    Oh, Sukho; Hwang, DongYeop; Kim, Ki-Hyung; Kim, Kangseok

    2018-01-01

    Time Slotted Channel Hopping (TSCH) is widely used in the industrial wireless sensor networks due to its high reliability and energy efficiency. Various timeslot and channel scheduling schemes have been proposed for achieving high reliability and energy efficiency for TSCH networks. Recently proposed autonomous scheduling schemes provide flexible timeslot scheduling based on the routing topology, but do not take into account the network traffic and packet forwarding delays. In this paper, we propose an autonomous scheduling scheme for convergecast in TSCH networks with RPL as a routing protocol, named Escalator. Escalator generates a consecutive timeslot schedule along the packet forwarding path to minimize the packet transmission delay. The schedule is generated autonomously by utilizing only the local routing topology information without any additional signaling with other nodes. The generated schedule is guaranteed to be conflict-free, in that all nodes in the network could transmit packets to the sink in every slotframe cycle. We implement Escalator and evaluate its performance with existing autonomous scheduling schemes through a testbed and simulation. Experimental results show that the proposed Escalator has lower end-to-end delay and higher packet delivery ratio compared to the existing schemes regardless of the network topology. PMID:29659508

  8. Aspects of job scheduling

    NASA Technical Reports Server (NTRS)

    Phillips, K.

    1976-01-01

    A mathematical model for job scheduling in a specified context is presented. The model uses both linear programming and combinatorial methods. While designed with a view toward optimization of scheduling of facility and plant operations at the Deep Space Communications Complex, the context is sufficiently general to be widely applicable. The general scheduling problem including options for scheduling objectives is discussed and fundamental parameters identified. Mathematical algorithms for partitioning problems germane to scheduling are presented.

  9. The Causal Effect of the School Day Schedule on Adolescents' Academic Achievement

    ERIC Educational Resources Information Center

    Shapiro, Teny M.; Williams, Kevin M.

    2015-01-01

    This study looks at the causal impact of the school day schedule on student achievement. How a student's classes are scheduled throughout the day is often determined by necessity, but can have a meaningful impact on academic performance. Acknowledging students' internal clocks and making small changes to scheduling patters could be a relatively…

  10. Artificial Immune Algorithm for Subtask Industrial Robot Scheduling in Cloud Manufacturing

    NASA Astrophysics Data System (ADS)

    Suma, T.; Murugesan, R.

    2018-04-01

    The current generation of manufacturing industry requires an intelligent scheduling model to achieve an effective utilization of distributed manufacturing resources, which motivated us to work on an Artificial Immune Algorithm for subtask robot scheduling in cloud manufacturing. This scheduling model enables a collaborative work between the industrial robots in different manufacturing centers. This paper discussed two optimizing objectives which includes minimizing the cost and load balance of industrial robots through scheduling. To solve these scheduling problems, we used the algorithm based on Artificial Immune system. The parameters are simulated with MATLAB and the results compared with the existing algorithms. The result shows better performance than existing.

  11. Medications for Sleep Schedule Adjustments in Athletes.

    PubMed

    Baird, Matthew B; Asif, Irfan M

    Sleep schedule adjustments are common requirements of modern-day athletes. Many nonpharmacologic and pharmacologic strategies exist to facilitate circadian rhythm shifts to maximize alertness and performance during competition. This review summarizes the evidence for commonly used pharmacologic agents and presents recommendations for the sports medicine provider. MEDLINE searches were performed using the following keywords: sleep aids, circadian rhythm adjustment, athletes and sleep, caffeine and sports, melatonin and athletes, and sleep aids and sports. Pertinent articles were extracted and discussed. Clinical review. Level 2. There are very few available studies investigating pharmacologic sleep aids in athletes. Data from studies involving shift workers and airline personnel are more abundant and were used to formulate recommendations and conclusions. Melatonin, caffeine, and nonbenzodiazepine sleep aids have a role in facilitating sleep schedule changes in athletes and maximizing sports performance through sleep enhancement.

  12. Robust Aircraft Squadron Scheduling in the Face of Absenteeism

    DTIC Science & Technology

    2008-03-01

    Complicating matters is absenteeism . If one or more pilots are unable to perform their previously assigned tasks, due to sickness, aircraft failure, or...ROBUST AIRCRAFT SQUADRON SCHEDULING IN THE FACE OF ABSENTEEISM THESIS Osman B Gokcen, 1st...or the United States Government. AFIT/GOR/ENS/08-06 ROBUST AIRCRAFT SQUADRON SCHEDULING IN THE FACE OF ABSENTEEISM THESIS

  13. Evolution and revolution: gauging the impact of technological and technical innovation on Olympic performance.

    PubMed

    Balmer, Nigel; Pleasence, Pascoe; Nevill, Alan

    2012-01-01

    A number of studies have pointed to a plateauing of athletic performance, with the suggestion that further improvements will need to be driven by revolutions in technology or technique. In the present study, we examine post-war men's Olympic performance in jumping events (pole vault, long jump, high jump, triple jump) to determine whether performance has indeed plateaued and to present techniques, derived from models of human growth, for assessing the impact of technological and technical innovation over time (logistic and double logistic models of growth). Significantly, two of the events involve well-documented changes in technology (pole material in pole vault) or technique (the Fosbury Flop in high jump), while the other two do not. We find that in all four cases, performance appears to have plateaued and that no further "general" improvement should be expected. In the case of high jump, the double logistic model provides a convenient method for modelling and quantifying a performance intervention (in this case the Fosbury Flop). However, some shortcomings are revealed for pole vault, where evolutionary post-war improvements and innovation (fibre glass poles) were concurrent, preventing their separate identification in the model. In all four events, it is argued that further general growth in performance will indeed need to rely predominantly on technological or technical innovation.

  14. 29 CFR 825.203 - Scheduling of intermittent or reduced schedule leave.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... OF LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Employee Leave Entitlements Under the Family and Medical Leave Act § 825.203 Scheduling of intermittent or reduced schedule leave. Eligible... leave intermittently or on a reduced leave schedule for planned medical treatment, then the employee...

  15. 29 CFR 825.203 - Scheduling of intermittent or reduced schedule leave.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... OF LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Employee Leave Entitlements Under the Family and Medical Leave Act § 825.203 Scheduling of intermittent or reduced schedule leave. Eligible... leave intermittently or on a reduced leave schedule for planned medical treatment, then the employee...

  16. 29 CFR 825.203 - Scheduling of intermittent or reduced schedule leave.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... OF LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Employee Leave Entitlements Under the Family and Medical Leave Act § 825.203 Scheduling of intermittent or reduced schedule leave. Eligible... leave intermittently or on a reduced leave schedule for planned medical treatment, then the employee...

  17. 29 CFR 825.203 - Scheduling of intermittent or reduced schedule leave.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... OF LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Employee Leave Entitlements Under the Family and Medical Leave Act § 825.203 Scheduling of intermittent or reduced schedule leave. Eligible... leave intermittently or on a reduced leave schedule for planned medical treatment, then the employee...

  18. Single-Pass Serial Scheduling Heuristic for Eglin AFB Range Services Division Schedule

    DTIC Science & Technology

    2009-06-01

    scheduling tool for this RCPSP. Research on a schedule improvement metaheuristic and coding of the complete algorithm is required before it can be...a schedule better by applying metaheuristic improvement algorithms to a feasible schedule after it is created. 2.5.1. Greedy Algorithm The...next available position, the algorithm will not utilize all the available range time and manpower. An improvement metaheuristic is required to

  19. Operational assessment of the 5-h on/10-h off watchstanding schedule on a US Navy ship: sleep patterns, mood and psychomotor vigilance performance of crewmembers in the nuclear reactor department.

    PubMed

    Shattuck, Nita Lewis; Matsangas, Panagiotis

    2016-05-01

    We assessed sleep patterns, psychomotor vigilance performance, work demands and mood of 77 crewmembers of USS NIMITZ (CVN-68) on the rotating 5-h on/10-h off (5/10) watchstanding schedule. Within the 3-day cycle of the 5/10, sleep occurred at distinctly different times each day. On two of these days, sailors typically received only brief, 4-h sleep episodes followed by periods of sustained wakefulness (approximately 22 and 20 h). Crewmembers received approximately seven hours of sleep daily, but reported excessive fatigue and dissatisfaction with their schedule. Crewmembers' mood worsened significantly over the course of the underway phase. Psychomotor vigilance performance (reaction times, lapses) was significantly degraded compared to performance when working circadian-aligned schedules. Overall, standing watch on the 5/10 schedule, combined with other work duties, resulted in poor sleep hygiene. Crewmembers on the 5/10 experienced periodic bouts of sustained wakefulness and accrued a significant sleep debt due to extended workdays and circadian-misaligned sleep. Practitioner summary: We assessed crewmembers' sleep patterns, psychomotor vigilance performance and work demands when working a rotating 5-h on/10-h off (5/10) watchstanding schedule. The 5/10, combined with other work duties, resulted in poor sleep hygiene. Crewmembers experienced periodic bouts of sustained wakefulness and accrued a significant sleep debt due to extended workdays and circadian-misaligned sleep.

  20. Scheduling Nonconsumable Resources

    NASA Technical Reports Server (NTRS)

    Porta, Harry J.

    1990-01-01

    Users manual describes computer program SWITCH that schedules use of resources - by appliances switched on and off and use resources while they are on. Plans schedules according to predetermined goals; revises schedules when new goals imposed. Program works by depth-first searching with strict chronological back-tracking. Proceeds to evaluate alternatives as necessary, sometimes interacting with user.

  1. Design tool for multiprocessor scheduling and evaluation of iterative dataflow algorithms

    NASA Technical Reports Server (NTRS)

    Jones, Robert L., III

    1995-01-01

    A graph-theoretic design process and software tool is defined for selecting a multiprocessing scheduling solution for a class of computational problems. The problems of interest are those that can be described with a dataflow graph and are intended to be executed repetitively on a set of identical processors. Typical applications include signal processing and control law problems. Graph-search algorithms and analysis techniques are introduced and shown to effectively determine performance bounds, scheduling constraints, and resource requirements. The software tool applies the design process to a given problem and includes performance optimization through the inclusion of additional precedence constraints among the schedulable tasks.

  2. Improving DOE Project Performance Using the DOD Integrated Master Plan - 12481

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Alleman, Glen B.; Nosbisch, Michael R.

    2012-07-01

    DOE O 413 measures a project's progress to plan by the consumption of funding, the passage of time, and the meeting of milestones. In March of 2003, then Under Secretary, Energy, Science, Card received a memo directing the implementation of Project Management and the Project Management Manual, including the Integrated Master Plan and Integrated Master Schedule. This directive states 'the integrated master plan and schedule tie together all project tasks by showing their logical relationships and any constraints controlling the start or finish of each task. This process results in a hierarchy of related functional and layered schedules derived frommore » the Work Breakdown Structure that can be used for monitoring and controlling project progress'. This paper shows how restoring the IMP/IMS paradigm to DOE program management increases the probability of program success in ways not currently available using DOD O 413 processes alone. Using DOE O 413 series guidance, adding the Integrated Master Plan and Integrated Master Schedule paradigm would provide a hierarchical set of performance measures for each 'package of work,' that provides measurable visibility to the increasing maturity of the project. This measurable maturity provides the mechanism to forecast future performance of cost, schedule, and technical outcomes in ways not available using just the activities in DOE O 413. With this information project managers have another tool available to address the issues identified in GAO-07-336 and GAO-09-406. (authors)« less

  3. Sensor Transmission Power Schedule for Smart Grids

    NASA Astrophysics Data System (ADS)

    Gao, C.; Huang, Y. H.; Li, J.; Liu, X. D.

    2017-11-01

    Smart grid has attracted much attention by the requirement of new generation renewable energy. Nowadays, the real-time state estimation, with the help of phasor measurement unit, plays an important role to keep smart grid stable and efficient. However, the limitation of the communication channel is not considered by related work. Considering the familiar limited on-board batteries wireless sensor in smart grid, transmission power schedule is designed in this paper, which minimizes energy consumption with proper EKF filtering performance requirement constrain. Based on the event-triggered estimation theory, the filtering algorithm is also provided to utilize the information contained in the power schedule. Finally, its feasibility and performance is demonstrated using the standard IEEE 39-bus system with phasor measurement units (PMUs).

  4. Use of Activity Schedule to Promote Independent Performance of Individuals with Autism and Other Intellectual Disabilities: A Review

    ERIC Educational Resources Information Center

    Koyama, Takanori; Wang, Hui-Ting

    2011-01-01

    A literature review was conducted on the effectiveness of activity schedules. Twenty three studies that a) were peer-reviewed, b) were experimental, c) implemented activity schedule as a primary intervention, d) incorporated multiple activities, and e) aimed to teach learners to self-manage individual schedules were included in the review. The…

  5. Linux Kernel Co-Scheduling and Bulk Synchronous Parallelism

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jones, Terry R

    2012-01-01

    This paper describes a kernel scheduling algorithm that is based on coscheduling principles and that is intended for parallel applications running on 1000 cores or more. Experimental results for a Linux implementation on a Cray XT5 machine are presented. The results indicate that Linux is a suitable operating system for this new scheduling scheme, and that this design provides a dramatic improvement in scaling performance for synchronizing collective operations at scale.

  6. Research on the ITOC based scheduling system for ship piping production

    NASA Astrophysics Data System (ADS)

    Li, Rui; Liu, Yu-Jun; Hamada, Kunihiro

    2010-12-01

    Manufacturing of ship piping systems is one of the major production activities in shipbuilding. The schedule of pipe production has an important impact on the master schedule of shipbuilding. In this research, the ITOC concept was introduced to solve the scheduling problems of a piping factory, and an intelligent scheduling system was developed. The system, in which a product model, an operation model, a factory model, and a knowledge database of piping production were integrated, automated the planning process and production scheduling. Details of the above points were discussed. Moreover, an application of the system in a piping factory, which achieved a higher level of performance as measured by tardiness, lead time, and inventory, was demonstrated.

  7. 9 CFR 354.26 - Schedule of operation of official plants.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Performance of Services § 354.26 Schedule of operation of official plants. Inspection operating schedules for... operation shall be reasonably uniform from day to day. Inspectors are to be notified by management 1 day in advance of any change in the hours inspection service is requested. Application for Inspection Service ...

  8. A Comparison of Techniques for Scheduling Earth-Observing Satellites

    NASA Technical Reports Server (NTRS)

    Globus, Al; Crawford, James; Lohn, Jason; Pryor, Anna

    2004-01-01

    Scheduling observations by coordinated fleets of Earth Observing Satellites (EOS) involves large search spaces, complex constraints and poorly understood bottlenecks, conditions where evolutionary and related algorithms are often effective. However, there are many such algorithms and the best one to use is not clear. Here we compare multiple variants of the genetic algorithm: stochastic hill climbing, simulated annealing, squeaky wheel optimization and iterated sampling on ten realistically-sized EOS scheduling problems. Schedules are represented by a permutation (non-temperal ordering) of the observation requests. A simple deterministic scheduler assigns times and resources to each observation request in the order indicated by the permutation, discarding those that violate the constraints created by previously scheduled observations. Simulated annealing performs best. Random mutation outperform a more 'intelligent' mutator. Furthermore, the best mutator, by a small margin, was a novel approach we call temperature dependent random sampling that makes large changes in the early stages of evolution and smaller changes towards the end of search.

  9. Automatic Generation of Heuristics for Scheduling

    NASA Technical Reports Server (NTRS)

    Morris, Robert A.; Bresina, John L.; Rodgers, Stuart M.

    1997-01-01

    This paper presents a technique, called GenH, that automatically generates search heuristics for scheduling problems. The impetus for developing this technique is the growing consensus that heuristics encode advice that is, at best, useful in solving most, or typical, problem instances, and, at worst, useful in solving only a narrowly defined set of instances. In either case, heuristic problem solvers, to be broadly applicable, should have a means of automatically adjusting to the idiosyncrasies of each problem instance. GenH generates a search heuristic for a given problem instance by hill-climbing in the space of possible multi-attribute heuristics, where the evaluation of a candidate heuristic is based on the quality of the solution found under its guidance. We present empirical results obtained by applying GenH to the real world problem of telescope observation scheduling. These results demonstrate that GenH is a simple and effective way of improving the performance of an heuristic scheduler.

  10. Operational VGOS Scheduling

    NASA Astrophysics Data System (ADS)

    Searle, Anthony; Petrachenko, Bill

    2016-12-01

    The VLBI Global Observing System (VGOS) has been designed to take advantage of advances in data recording speeds and storage capacity, allowing for smaller and faster antennas, wider bandwidths, and shorter observation durations. Here, schedules for a ``realistic" VGOS network, frequency sequences, and expanded source lists are presented using a new source-based scheduling algorithm. The VGOS aim for continuous observations presents new operational challenges. As the source-based strategy is independent of the observing network, there are operational advantages which allow for more flexible scheduling of continuous VLBI observations. Using VieVS, simulations of several schedules are presented and compared with previous VGOS studies.

  11. Concepts, requirements, and design approaches for building successful planning and scheduling systems

    NASA Technical Reports Server (NTRS)

    Hornstein, Rhoda Shaller; Willoughby, John K.

    1991-01-01

    Traditional practice of systems engineering management assumes requirements can be precisely determined and unambiguously defined prior to system design and implementation; practice further assumes requirements are held static during implementation. Human-computer decision support systems for service planning and scheduling applications do not conform well to these assumptions. Adaptation to the traditional practice of systems engineering management are required. Basic technology exists to support these adaptations. Additional innovations must be encouraged and nutured. Continued partnership between the programmatic and technical perspective assures proper balance of the impossible with the possible. Past problems have the following origins: not recognizing the unusual and perverse nature of the requirements for planning and scheduling; not recognizing the best starting point assumptions for the design; not understanding the type of system that being built; and not understanding the design consequences of the operations concept selected.

  12. Scheduling and rescheduling with iterative repair

    NASA Technical Reports Server (NTRS)

    Zweben, Monte; Davis, Eugene; Daun, Brian; Deale, Michael

    1992-01-01

    This paper describes the GERRY scheduling and rescheduling system being applied to coordinate Space Shuttle Ground Processing. The system uses constraint-based iterative repair, a technique that starts with a complete but possibly flawed schedule and iteratively improves it by using constraint knowledge within repair heuristics. In this paper we explore the tradeoff between the informedness and the computational cost of several repair heuristics. We show empirically that some knowledge can greatly improve the convergence speed of a repair-based system, but that too much knowledge, such as the knowledge embodied within the MIN-CONFLICTS lookahead heuristic, can overwhelm a system and result in degraded performance.

  13. Implementation Learning and Forgetting Curve to Scheduling in Garment Industry

    NASA Astrophysics Data System (ADS)

    Muhamad Badri, Huda; Deros, Baba Md; Syahri, M.; Saleh, Chairul; Fitria, Aninda

    2016-02-01

    The learning curve shows the relationship between time and the cumulative number of units produced which using the mathematical description on the performance of workers in performing repetitive works. The problems of this study is level differences in the labors performance before and after the break which affects the company's production scheduling. The study was conducted in the garment industry, which the aims is to predict the company production scheduling using the learning curve and forgetting curve. By implementing the learning curve and forgetting curve, this paper contributes in improving the labors performance that is in line with the increase in maximum output 3 hours productive before the break are 15 unit product with learning curve percentage in the company is 93.24%. Meanwhile, the forgetting curve improving maximum output 3 hours productive after the break are 11 unit product with the percentage of forgetting curve in the company is 92.96%. Then, the obtained 26 units product on the productive hours one working day is used as the basic for production scheduling.

  14. Monitoring the Durability Performance of Concrete in Nuclear Waste Containment. Technical Progress Report No. 3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ulm, Franz-Josef

    2000-03-31

    OAK-B135 Monitoring the Durability Performance of Concrete in Nuclear Waste Containment. Technical Progress Report No. 3(NOTE: Part II A item 1 indicates ''PAPER'', but a report is attached electronically)

  15. Planning Risk-Based SQC Schedules for Bracketed Operation of Continuous Production Analyzers.

    PubMed

    Westgard, James O; Bayat, Hassan; Westgard, Sten A

    2018-02-01

    To minimize patient risk, "bracketed" statistical quality control (SQC) is recommended in the new CLSI guidelines for SQC (C24-Ed4). Bracketed SQC requires that a QC event both precedes and follows (brackets) a group of patient samples. In optimizing a QC schedule, the frequency of QC or run size becomes an important planning consideration to maintain quality and also facilitate responsive reporting of results from continuous operation of high production analytic systems. Different plans for optimizing a bracketed SQC schedule were investigated on the basis of Parvin's model for patient risk and CLSI C24-Ed4's recommendations for establishing QC schedules. A Sigma-metric run size nomogram was used to evaluate different QC schedules for processes of different sigma performance. For high Sigma performance, an effective SQC approach is to employ a multistage QC procedure utilizing a "startup" design at the beginning of production and a "monitor" design periodically throughout production. Example QC schedules are illustrated for applications with measurement procedures having 6-σ, 5-σ, and 4-σ performance. Continuous production analyzers that demonstrate high σ performance can be effectively controlled with multistage SQC designs that employ a startup QC event followed by periodic monitoring or bracketing QC events. Such designs can be optimized to minimize the risk of harm to patients. © 2017 American Association for Clinical Chemistry.

  16. Projecting Future Scheduled Airline Demand, Schedules and NGATS Benefits Using TSAM

    NASA Technical Reports Server (NTRS)

    Dollyhigh, Samuel; Smith, Jeremy; Viken, Jeff; Trani, Antonio; Baik, Hojong; Hinze, Nickolas; Ashiabor, Senanu

    2006-01-01

    The Transportation Systems Analysis Model (TSAM) developed by Virginia Tech s Air Transportation Systems Lab and NASA Langley can provide detailed analysis of the effects on the demand for air travel of a full range of NASA and FAA aviation projects. TSAM has been used to project the passenger demand for very light jet (VLJ) air taxi service, scheduled airline demand growth and future schedules, Next Generation Air Transportation System (NGATS) benefits, and future passenger revenues for the Airport and Airway Trust Fund. TSAM can project the resulting demand when new vehicles and/or technology is inserted into the long distance (100 or more miles one-way) transportation system, as well as, changes in demand as a result of fare yield increases or decreases, airport transit times, scheduled flight times, ticket taxes, reductions or increases in flight delays, and so on. TSAM models all long distance travel in the contiguous U.S. and determines the mode choice of the traveler based on detailed trip costs, travel time, schedule frequency, purpose of the trip (business or non-business), and household income level of the traveler. Demand is modeled at the county level, with an airport choice module providing up to three airports as part of the mode choice. Future enplanements at airports can be projected for different scenarios. A Fratar algorithm and a schedule generator are applied to generate future flight schedules. This paper presents the application of TSAM to modeling future scheduled air passenger demand and resulting airline schedules, the impact of NGATS goals and objectives on passenger demand, along with projections for passenger fee receipts for several scenarios for the FAA Airport and Airway Trust Fund.

  17. A Quantitative Causal-Comparative Study Examining the Effect of Block and Traditional Bell Schedules on Cognitive Load and Mathematics Academic Performance in High School Freshmen of the Southwestern USA

    ERIC Educational Resources Information Center

    Nogler, Tracey A.

    2017-01-01

    The purpose of this quantitative causal-comparative research was to examine if and to what extent there were differences in students' cognitive load and the subsequent academic performance based on block bell schedule and traditional bell schedule for freshmen in Algebra 1 in the Southwestern United States. This study included students from two…

  18. Design Considerations for a New Terminal Area Arrival Scheduler

    NASA Technical Reports Server (NTRS)

    Thipphavong, Jane; Mulfinger, Daniel

    2010-01-01

    Design of a terminal area arrival scheduler depends on the interrelationship between throughput, delay and controller intervention. The main contribution of this paper is an analysis of the above interdependence for several stochastic behaviors of expected system performance distributions in the aircraft s time of arrival at the meter fix and runway. Results of this analysis serve to guide the scheduler design choices for key control variables. Two types of variables are analyzed, separation buffers and terminal delay margins. The choice for these decision variables was tested using sensitivity analysis. Analysis suggests that it is best to set the separation buffer at the meter fix to its minimum and adjust the runway buffer to attain the desired system performance. Delay margin was found to have the least effect. These results help characterize the variables most influential in the scheduling operations of terminal area arrivals.

  19. Second-order schedules of token reinforcement with pigeons: effects of fixed- and variable-ratio exchange schedules.

    PubMed

    Foster, T A; Hackenberg, T D; Vaidya, M

    2001-09-01

    Pigeons' key pecks produced food under second-order schedules of token reinforcement, with light-emitting diodes serving as token reinforcers. In Experiment 1, tokens were earned according to a fixed-ratio 50 schedule and were exchanged for food according to either fixed-ratio or variable-ratio exchange schedules, with schedule type varied across conditions. In Experiment 2, schedule type was varied within sessions using a multiple schedule. In one component, tokens were earned according to a fixed-ratio 50 schedule and exchanged according to a variable-ratio schedule. In the other component, tokens were earned according to a variable-ratio 50 schedule and exchanged according to a fixed-ratio schedule. In both experiments, the number of responses per exchange was varied parametrically across conditions, ranging from 50 to 400 responses. Response rates decreased systematically with increases in the fixed-ratio exchange schedules, but were much less affected by changes in the variable-ratio exchange schedules. Response rates were consistently higher under variable-ratio exchange schedules than tinder comparable fixed-ratio exchange schedules, especially at higher exchange ratios. These response-rate differences were due both to greater pre-ratio pausing and to lower local rates tinder the fixed-ratio exchange schedules. Local response rates increased with proximity to food under the higher fixed-ratio exchange schedules, indicative of discriminative control by the tokens.

  20. Technical activity profile and influence of body anthropometry on playing performance in female elite team handball.

    PubMed

    Michalsik, Lars B; Aagaard, Per; Madsen, Klavs

    2015-04-01

    To determine the physical demands placed on female elite team handball (TH) players in relation to playing position and body anthropometry, female elite TH primarily field players were monitored during match-play using video recording and subsequent computerized technical match analysis during 5 regular tournament match seasons. Technical match activities were distributed in 6 major types of playing actions (shots, breakthroughs, fast breaks, technical errors, defensive errors, and tackles) and further divided into various subcategories (e.g., type of shot, hard or light tackles, claspings, screenings, and blockings). Furthermore, anthropometric measurements were performed. Each player had 28.3 ± 11.0 (group means ± SD) high-intense playing actions per match with a total effective playing time of 50.70 ± 5.83 minutes. On average, each player made 2.8 ± 2.6 fast breaks, gave 7.9 ± 14.4 screenings, received 14.6 ± 9.2 tackles in total, and performed 7.7 ± 3.7 shots while in offense, along with 3.5 ± 3.8 blockings, 1.9 ± 2.7 claspings, and 6.2 ± 3.8 hard tackles in defense. Mean body height, body mass, and age in the Danish Premier Female Team Handball League were 175.4 ± 6.1 cm, 69.5 ± 6.5 kg, and 25.4 ± 3.7 years, respectively. Wing players were lighter (63.5 ± 4.8 kg, p < 0.001) and smaller (169.3 ± 4.9 cm, p < 0.001) than backcourt players (BP) (70.6 ± 5.3 kg, 177.0 ± 5.4 cm) and pivots (PV) (72.5 ± 4.9 kg, 177.7 ± 4.9 cm). In conclusion, the present match observations revealed that female elite TH players during competitive games intermittently perform a high number of short-term, high-intense technical playing actions making modern female elite TH a physically demanding team sport. No sign of technical fatigue were observed, since the amount of intense technical playing actions remained unchanged in the second half. Marked positional differences in the physical demands were demonstrated, with wing players performing more fast breaks and less

  1. Scheduling the future NASA Space Network: Experiences with a flexible scheduling prototype

    NASA Technical Reports Server (NTRS)

    Happell, Nadine; Moe, Karen L.; Minnix, Jay

    1993-01-01

    NASA's Space Network (SN) provides telecommunications and tracking services to low earth orbiting spacecraft. One proposal for improving resource allocation and automating conflict resolution for the SN is the concept of flexible scheduling. In this concept, each Payload Operations Control Center (POCC) will possess a Space Network User POCC Interface (SNUPI) to support the development and management of flexible requests. Flexible requests express the flexibility, constraints, and repetitious nature of the user's communications requirements. Flexible scheduling is expected to improve SN resource utilization and user satisfaction, as well as reduce the effort to produce and maintain a schedule. A prototype testbed has been developed to better understand flexible scheduling as it applies to the SN. This testbed consists of a SNUPI workstation, an SN scheduler, and a flexible request language that conveys information between the two systems. All three are being evaluated by operations personnel. Benchmark testing is being conducted on the scheduler to quantify the productivity improvements achieved with flexible requests.

  2. DSN Resource Scheduling

    NASA Technical Reports Server (NTRS)

    Wang, Yeou-Fang; Baldwin, John

    2007-01-01

    TIGRAS is client-side software, which provides tracking-station equipment planning, allocation, and scheduling services to the DSMS (Deep Space Mission System). TIGRAS provides functions for schedulers to coordinate the DSN (Deep Space Network) antenna usage time and to resolve the resource usage conflicts among tracking passes, antenna calibrations, maintenance, and system testing activities. TIGRAS provides a fully integrated multi-pane graphical user interface for all scheduling operations. This is a great improvement over the legacy VAX VMS command line user interface. TIGRAS has the capability to handle all DSN resource scheduling aspects from long-range to real time. TIGRAS assists NASA mission operations for DSN tracking of station equipment resource request processes from long-range load forecasts (ten years or longer), to midrange, short-range, and real-time (less than one week) emergency tracking plan changes. TIGRAS can be operated by NASA mission operations worldwide to make schedule requests for the DSN station equipment.

  3. Constraint-based scheduling

    NASA Technical Reports Server (NTRS)

    Zweben, Monte

    1991-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  4. Constraint-based scheduling

    NASA Technical Reports Server (NTRS)

    Zweben, Monte

    1991-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocations for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its applications to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  5. Constraint-based scheduling

    NASA Technical Reports Server (NTRS)

    Zweben, Monte

    1993-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  6. Spiking neural network simulation: memory-optimal synaptic event scheduling.

    PubMed

    Stewart, Robert D; Gurney, Kevin N

    2011-06-01

    Spiking neural network simulations incorporating variable transmission delays require synaptic events to be scheduled prior to delivery. Conventional methods have memory requirements that scale with the total number of synapses in a network. We introduce novel scheduling algorithms for both discrete and continuous event delivery, where the memory requirement scales instead with the number of neurons. Superior algorithmic performance is demonstrated using large-scale, benchmarking network simulations.

  7. Linear-parameter-varying gain-scheduled control of aerospace systems

    NASA Astrophysics Data System (ADS)

    Barker, Jeffrey Michael

    The dynamics of many aerospace systems vary significantly as a function of flight condition. Robust control provides methods of guaranteeing performance and stability goals across flight conditions. In mu-syntthesis, changes to the dynamical system are primarily treated as uncertainty. This method has been successfully applied to many control problems, and here is applied to flutter control. More recently, two techniques for generating robust gain-scheduled controller have been developed. Linear fractional transformation (LFT) gain-scheduled control is an extension of mu-synthesis in which the plant and controller are explicit functions of parameters measurable in real-time. This LFT gain-scheduled control technique is applied to the Benchmark Active Control Technology (BACT) wing, and compared with mu-synthesis control. Linear parameter-varying (LPV) gain-scheduled control is an extension of Hinfinity control to parameter varying systems. LPV gain-scheduled control directly incorporates bounds on the rate of change of the scheduling parameters, and often reduces conservatism inherent in LFT gain-scheduled control. Gain-scheduled LPV control of the BACT wing compares very favorably with the LFT controller. Gain-scheduled LPV controllers are generated for the lateral-directional and longitudinal axes of the Innovative Control Effectors (ICE) aircraft and implemented in nonlinear simulations and real-time piloted nonlinear simulations. Cooper-Harper and pilot-induced oscillation ratings were obtained for an initial design, a reference aircraft and a redesign. Piloted simulation results for the initial LPV gain-scheduled control of the ICE aircraft are compared with results for a conventional fighter aircraft in discrete pitch and roll angle tracking tasks. The results for the redesigned controller are significantly better than both the previous LPV controller and the conventional aircraft.

  8. A laboratory comparison of clockwise and counter-clockwise rapidly rotating shift schedules, part II : performance : final report.

    DOT National Transportation Integrated Search

    2002-07-01

    INTRODUCTION. Many Air Traffic Control Specialists (ATCSs) work a relatively unique counter-clockwise, rapidly rotating shift schedule. Although arguments against these kinds of schedules are prevalent in the literature, few studies have examined rot...

  9. Perceptions of randomized security schedules.

    PubMed

    Scurich, Nicholas; John, Richard S

    2014-04-01

    Security of infrastructure is a major concern. Traditional security schedules are unable to provide omnipresent coverage; consequently, adversaries can exploit predictable vulnerabilities to their advantage. Randomized security schedules, which randomly deploy security measures, overcome these limitations, but public perceptions of such schedules have not been examined. In this experiment, participants were asked to make a choice between attending a venue that employed a traditional (i.e., search everyone) or a random (i.e., a probability of being searched) security schedule. The absolute probability of detecting contraband was manipulated (i.e., 1/10, 1/4, 1/2) but equivalent between the two schedule types. In general, participants were indifferent to either security schedule, regardless of the probability of detection. The randomized schedule was deemed more convenient, but the traditional schedule was considered fairer and safer. There were no differences between traditional and random schedule in terms of perceived effectiveness or deterrence. Policy implications for the implementation and utilization of randomized schedules are discussed. © 2013 Society for Risk Analysis.

  10. Missed deadline notification in best-effort schedulers

    NASA Astrophysics Data System (ADS)

    Banachowski, Scott A.; Wu, Joel; Brandt, Scott A.

    2003-12-01

    It is common to run multimedia and other periodic, soft real-time applications on general-purpose computer systems. These systems use best-effort scheduling algorithms that cannot guarantee applications will receive responsive scheduling to meet deadline or timing requirements. We present a simple mechanism called Missed Deadline Notification (MDN) that allows applications to notify the system when they do not receive their desired level of responsiveness. Consisting of a single system call with no arguments, this simple interface allows the operating system to provide better support for soft real-time applications without any a priori information about their timing or resource needs. We implemented MDN in three different schedulers: Linux, BEST, and BeRate. We describe these implementations and their performance when running real-time applications and discuss policies to prevent applications from abusing MDN to gain extra resources.

  11. Conflicts of Time: Examining School Schedules in Secondary Agricultural Programs

    ERIC Educational Resources Information Center

    Epps, Rebekah B.; Adams, Randy J.; Vincent, Stacy K.

    2015-01-01

    The purpose of this study was to examine how school schedules can or cannot be justified through the perspective of student performance on state core content assessments and occupational skills standards assessments. This study utilized the Theory of Power in Education when considering school schedules as a means to student success on core content…

  12. Scheduling for energy and reliability management on multiprocessor real-time systems

    NASA Astrophysics Data System (ADS)

    Qi, Xuan

    Scheduling algorithms for multiprocessor real-time systems have been studied for years with many well-recognized algorithms proposed. However, it is still an evolving research area and many problems remain open due to their intrinsic complexities. With the emergence of multicore processors, it is necessary to re-investigate the scheduling problems and design/develop efficient algorithms for better system utilization, low scheduling overhead, high energy efficiency, and better system reliability. Focusing cluster schedulings with optimal global schedulers, we study the utilization bound and scheduling overhead for a class of cluster-optimal schedulers. Then, taking energy/power consumption into consideration, we developed energy-efficient scheduling algorithms for real-time systems, especially for the proliferating embedded systems with limited energy budget. As the commonly deployed energy-saving technique (e.g. dynamic voltage frequency scaling (DVFS)) will significantly affect system reliability, we study schedulers that have intelligent mechanisms to recuperate system reliability to satisfy the quality assurance requirements. Extensive simulation is conducted to evaluate the performance of the proposed algorithms on reduction of scheduling overhead, energy saving, and reliability improvement. The simulation results show that the proposed reliability-aware power management schemes could preserve the system reliability while still achieving substantial energy saving.

  13. Academic Performance of Students during Transition Period before Choice of Disciplines in Nigeria Certificate in Education (Technical) Programme

    ERIC Educational Resources Information Center

    Amasuomo, Japo Oweikeye

    2015-01-01

    The study examined the academic performance of students in the compulsory courses in technical education during the transition period of first and second years of three years Nigeria Certificate in Education (NCE) Technical programme before choosing their disciplines in the third year. The study comprised of 237 students that consisted of…

  14. Positional interchanges influence the physical and technical match performance variables of elite soccer players.

    PubMed

    Schuth, G; Carr, G; Barnes, C; Carling, C; Bradley, P S

    2016-01-01

    Positional variation in match performance is well established in elite soccer but no information exists on players switching positions. This study investigated the influence of elite players interchanging from one position to another on physical and technical match performance. Data were collected from multiple English Premier League (EPL) seasons using a computerised tracking system. After adhering to stringent inclusion criteria, players were examined across several interchanges: central-defender to fullback (CD-FB, n = 11, 312 observations), central-midfielder to wide-midfielder (CM-WM, n = 7, 171 observations), wide-midfielder to central-midfielder (WM-CM, n = 7, 197 observations) and attacker to wide-midfielder (AT-WM, n = 4, 81 observations). Players interchanging from CD-FB covered markedly more high-intensity running and sprinting distance (effect size [ES]: -1.56 and -1.26), lost more possessions but made more final third entries (ES: -1.23 and -1.55). Interchanging from CM-WM and WM-CM resulted in trivial to moderate differences in both physical (ES: -0.14-0.59 and -0.21-0.39) and technical performances (ES: -0.48-0.64 and -0.36-0.54). Players interchanging from AT-WM demonstrated a moderate difference in high-intensity running without possession (ES: -0.98) and moderate-to-large differences in the number of clearances, tackles and possessions won (ES: -0.77, -1.16 and -1.41). The data demonstrate that the physical and technical demands vary greatly from one interchange to another but utility players seem able to adapt to these positional switches.

  15. A procedural skills OSCE: assessing technical and non-technical skills of internal medicine residents.

    PubMed

    Pugh, Debra; Hamstra, Stanley J; Wood, Timothy J; Humphrey-Murto, Susan; Touchie, Claire; Yudkowsky, Rachel; Bordage, Georges

    2015-03-01

    Internists are required to perform a number of procedures that require mastery of technical and non-technical skills, however, formal assessment of these skills is often lacking. The purpose of this study was to develop, implement, and gather validity evidence for a procedural skills objective structured clinical examination (PS-OSCE) for internal medicine (IM) residents to assess their technical and non-technical skills when performing procedures. Thirty-five first to third-year IM residents participated in a 5-station PS-OSCE, which combined partial task models, standardized patients, and allied health professionals. Formal blueprinting was performed and content experts were used to develop the cases and rating instruments. Examiners underwent a frame-of-reference training session to prepare them for their rater role. Scores were compared by levels of training, experience, and to evaluation data from a non-procedural OSCE (IM-OSCE). Reliability was calculated using Generalizability analyses. Reliabilities for the technical and non-technical scores were 0.68 and 0.76, respectively. Third-year residents scored significantly higher than first-year residents on the technical (73.5 vs. 62.2%) and non-technical (83.2 vs. 75.1%) components of the PS-OSCE (p < 0.05). Residents who had performed the procedures more frequently scored higher on three of the five stations (p < 0.05). There was a moderate disattenuated correlation (r = 0.77) between the IM-OSCE and the technical component of the PS-OSCE scores. The PS-OSCE is a feasible method for assessing multiple competencies related to performing procedures and this study provides validity evidence to support its use as an in-training examination.

  16. Radiographic technical quality of root canal treatment performed by a new rotary single-file system.

    PubMed

    Colombo, Marco; Bassi, Cristina; Beltrami, Riccardo; Vigorelli, Paolo; Spinelli, Antonio; Cavada, Andrea; Dagna, Alberto; Chiesa, Marco; Poggio, Claudio

    2017-01-01

    The aim of the present study was to evaluate radiographically the technical quality of root canal filling performed by postgraduate students with a new single-file Nickel-Titanium System (F6 Skytaper Komet) in clinical practice. Records of 74 patients who had received endodontic treatment by postgraduate students at the School of Dentistry, Faculty of Medicine, University of Pavia in the period between September 2015 and April 2016 were collected and examined: the final sample consisted 114 teeth and 204 root canals. The quality of endodontic treatment was evaluated by examining the length of the filling in relation to the radiographic apex, the density of the obturation according to the presence of voids and the taper of root canal filling. Chi-squared analysis was used to determine statistically significant differences between the technical quality of root fillings according to tooth's type, position and curvature. The results showed that 75,49%, 82,84% and 90,69% of root filled canals had adequate length, density and taper respectively. Overall, the technical quality of root canal fillings performed by postgraduates students was acceptable in 60,78% of the cases.

  17. A&M. Technical service laboratory in administration building (TAN602). Floor plan, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    A&M. Technical service laboratory in administration building (TAN-602). Floor plan, reception desk, door and finish schedules. Ralph M. Parsons 1480-12-ANP/GE-3-602-A-1. INEEL index code no. 033-0602-00-693-107488 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  18. Assessing Technical Performance and Determining the Learning Curve in Cleft Palate Surgery Using a High-Fidelity Cleft Palate Simulator.

    PubMed

    Podolsky, Dale J; Fisher, David M; Wong Riff, Karen W; Szasz, Peter; Looi, Thomas; Drake, James M; Forrest, Christopher R

    2018-06-01

    This study assessed technical performance in cleft palate repair using a newly developed assessment tool and high-fidelity cleft palate simulator through a longitudinal simulation training exercise. Three residents performed five and one resident performed nine consecutive endoscopically recorded cleft palate repairs using a cleft palate simulator. Two fellows in pediatric plastic surgery and two expert cleft surgeons also performed recorded simulated repairs. The Cleft Palate Objective Structured Assessment of Technical Skill (CLOSATS) and end-product scales were developed to assess performance. Two blinded cleft surgeons assessed the recordings and the final repairs using the CLOSATS, end-product scale, and a previously developed global rating scale. The average procedure-specific (CLOSATS), global rating, and end-product scores increased logarithmically after each successive simulation session for the residents. Reliability of the CLOSATS (average item intraclass correlation coefficient (ICC), 0.85 ± 0.093) and global ratings (average item ICC, 0.91 ± 0.02) among the raters was high. Reliability of the end-product assessments was lower (average item ICC, 0.66 ± 0.15). Standard setting linear regression using an overall cutoff score of 7 of 10 corresponded to a pass score for the CLOSATS and the global score of 44 (maximum, 60) and 23 (maximum, 30), respectively. Using logarithmic best-fit curves, 6.3 simulation sessions are required to reach the minimum standard. A high-fidelity cleft palate simulator has been developed that improves technical performance in cleft palate repair. The simulator and technical assessment scores can be used to determine performance before operating on patients.

  19. 9 CFR 592.96 - Schedule of operation of official plants.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 9 Animals and Animal Products 2 2013-01-01 2013-01-01 false Schedule of operation of official plants. 592.96 Section 592.96 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE EGG PRODUCTS INSPECTION VOLUNTARY INSPECTION OF EGG PRODUCTS Performance of Services § 592.96 Schedule of operation of official plant...

  20. 9 CFR 592.96 - Schedule of operation of official plants.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 9 Animals and Animal Products 2 2014-01-01 2014-01-01 false Schedule of operation of official plants. 592.96 Section 592.96 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE EGG PRODUCTS INSPECTION VOLUNTARY INSPECTION OF EGG PRODUCTS Performance of Services § 592.96 Schedule of operation of official plant...

  1. 9 CFR 592.96 - Schedule of operation of official plants.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 9 Animals and Animal Products 2 2012-01-01 2012-01-01 false Schedule of operation of official plants. 592.96 Section 592.96 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE EGG PRODUCTS INSPECTION VOLUNTARY INSPECTION OF EGG PRODUCTS Performance of Services § 592.96 Schedule of operation of official plant...

  2. 9 CFR 592.96 - Schedule of operation of official plants.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 9 Animals and Animal Products 2 2011-01-01 2011-01-01 false Schedule of operation of official plants. 592.96 Section 592.96 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE EGG PRODUCTS INSPECTION VOLUNTARY INSPECTION OF EGG PRODUCTS Performance of Services § 592.96 Schedule of operation of official plant...

  3. A distributed scheduling algorithm for heterogeneous real-time systems

    NASA Technical Reports Server (NTRS)

    Zeineldine, Osman; El-Toweissy, Mohamed; Mukkamala, Ravi

    1991-01-01

    Much of the previous work on load balancing and scheduling in distributed environments was concerned with homogeneous systems and homogeneous loads. Several of the results indicated that random policies are as effective as other more complex load allocation policies. The effects of heterogeneity on scheduling algorithms for hard real time systems is examined. A distributed scheduler specifically to handle heterogeneities in both nodes and node traffic is proposed. The performance of the algorithm is measured in terms of the percentage of jobs discarded. While a random task allocation is very sensitive to heterogeneities, the algorithm is shown to be robust to such non-uniformities in system components and load.

  4. Empirical results on scheduling and dynamic backtracking

    NASA Technical Reports Server (NTRS)

    Boddy, Mark S.; Goldman, Robert P.

    1994-01-01

    At the Honeywell Technology Center (HTC), we have been working on a scheduling problem related to commercial avionics. This application is large, complex, and hard to solve. To be a little more concrete: 'large' means almost 20,000 activities, 'complex' means several activity types, periodic behavior, and assorted types of temporal constraints, and 'hard to solve' means that we have been unable to eliminate backtracking through the use of search heuristics. At this point, we can generate solutions, where solutions exist, or report failure and sometimes why the system failed. To the best of our knowledge, this is among the largest and most complex scheduling problems to have been solved as a constraint satisfaction problem, at least that has appeared in the published literature. This abstract is a preliminary report on what we have done and how. In the next section, we present our approach to treating scheduling as a constraint satisfaction problem. The following sections present the application in more detail and describe how we solve scheduling problems in the application domain. The implemented system makes use of Ginsberg's Dynamic Backtracking algorithm, with some minor extensions to improve its utility for scheduling. We describe those extensions and the performance of the resulting system. The paper concludes with some general remarks, open questions and plans for future work.

  5. Composite Scheduling

    ERIC Educational Resources Information Center

    Childers, Gary L.; Ireland, Rebecca Weeks

    2005-01-01

    In education, there is no one best way to do anything. There are compelling reasons why some courses should be taught in longer segments of time, which the block schedule provides. There are also compelling reasons why some classes should be taught in shorter segments. At Watauga High School in Boone, North Carolina, an alternative schedule that…

  6. How should periods without social interaction be scheduled? Children's preference for practical schedules of positive reinforcement.

    PubMed

    Luczynski, Kevin C; Hanley, Gregory P

    2014-01-01

    Several studies have shown that children prefer contingent reinforcement (CR) rather than yoked noncontingent reinforcement (NCR) when continuous reinforcement is programmed in the CR schedule. Preference has not, however, been evaluated for practical schedules that involve CR. In Study 1, we assessed 5 children's preference for obtaining social interaction via a multiple schedule (periods of fixed-ratio 1 reinforcement alternating with periods of extinction), a briefly signaled delayed reinforcement schedule, and an NCR schedule. The multiple schedule promoted the most efficient level of responding. In general, children chose to experience the multiple schedule and avoided the delay and NCR schedules, indicating that they preferred multiple schedules as the means to arrange practical schedules of social interaction. In Study 2, we evaluated potential controlling variables that influenced 1 child's preference for the multiple schedule and found that the strong positive contingency was the primary variable. © Society for the Experimental Analysis of Behavior.

  7. Lunar mission safety and rescue: Technical summary

    NASA Technical Reports Server (NTRS)

    1971-01-01

    A technical summary is presented of the escape/rescue and the hazards analyses for manned missions and operations in the 1980 time frame. Hazards are interpreted as hazards to man, not to equipment, program schedule, or program objectives. Hazards in 39 individual areas are analyzed, and corrective measures are recommended. Over 200 safety guidelines are proposed, based on significant hazards. Escape and rescue situtations and requirements are identified and analyzed, and escape/survival/rescue concepts are defined to cope with each escape/rescue situation. Areas in which research or technical development efforts could improve mission safety are identified. It is concluded that the primary emphasis should be on survival and escape provisions, with rescue required only where self-help cannot bring the endangered crewmen to a safe haven.

  8. Reinforcement learning in scheduling

    NASA Technical Reports Server (NTRS)

    Dietterich, Tom G.; Ok, Dokyeong; Zhang, Wei; Tadepalli, Prasad

    1994-01-01

    The goal of this research is to apply reinforcement learning methods to real-world problems like scheduling. In this preliminary paper, we show that learning to solve scheduling problems such as the Space Shuttle Payload Processing and the Automatic Guided Vehicle (AGV) scheduling can be usefully studied in the reinforcement learning framework. We discuss some of the special challenges posed by the scheduling domain to these methods and propose some possible solutions we plan to implement.

  9. Effect of quinolinic acid-induced lesions of the subthalamic nucleus on performance on a progressive-ratio schedule of reinforcement: A quantitative analysis

    PubMed Central

    Bezzina, G.; Boon, F.S. den; Hampson, C.L.; Cheung, T.H.C.; Body, S.; Bradshaw, C.M.; Szabadi, E.; Anderson, I.M.; Deakin, J.F.W.

    2008-01-01

    The subthalamic nucleus (STN), a major relay in the indirect striatofugal pathway, plays an important role in extrapyramidal motor control. Recent evidence indicates that it may also be involved in regulating the incentive value of food reinforcers. Objective To examine the effect of lesions of the STN on performance on a progressive-ratio schedule using a quantitative model that dissociates effects of interventions on motor and motivational processes [Killeen PR. Mathematical principles of reinforcement. Behav Brain Sci 1994;17:105–72]. Rats with bilateral quinolinic acid-induced lesions of the STN (n = 14) or sham lesions (n = 14) were trained to press a lever for food-pellet reinforcers under a progressive-ratio schedule. In Phase 1 (90 sessions) the reinforcer was one pellet; in Phase 2 (30 sessions) it was two pellets; in Phase 3 (30 sessions) it was again one pellet. Results The performance of both groups conformed to the model of progressive-ratio schedule performance. The motor parameter, δ, was significantly higher in the STN-lesioned than the sham-lesioned group, reflecting lower overall response rates in the lesioned group. The motivational parameter, a, was significantly higher in the STN-lesioned group than in the sham-lesioned group, consistent with enhanced reinforcer value in the STN-lesioned group compared to the sham-lesioned group. In both groups, a was sensitive to changes in reinforcer size, being significantly greater under the two-pellet condition (Phase 2) than under the one-pellet condition (Phases 1 and 3). The results suggest that destruction of the STN impairs response capacity and enhances the incentive value of food reinforcers. PMID:18840473

  10. The comparison of predictive scheduling algorithms for different sizes of job shop scheduling problems

    NASA Astrophysics Data System (ADS)

    Paprocka, I.; Kempa, W. M.; Grabowik, C.; Kalinowski, K.; Krenczyk, D.

    2016-08-01

    In the paper a survey of predictive and reactive scheduling methods is done in order to evaluate how the ability of prediction of reliability characteristics influences over robustness criteria. The most important reliability characteristics are: Mean Time to Failure, Mean Time of Repair. Survey analysis is done for a job shop scheduling problem. The paper answers the question: what method generates robust schedules in the case of a bottleneck failure occurrence before, at the beginning of planned maintenance actions or after planned maintenance actions? Efficiency of predictive schedules is evaluated using criteria: makespan, total tardiness, flow time, idle time. Efficiency of reactive schedules is evaluated using: solution robustness criterion and quality robustness criterion. This paper is the continuation of the research conducted in the paper [1], where the survey of predictive and reactive scheduling methods is done only for small size scheduling problems.

  11. Effects of age, tenure, training, and job complexity on technical performance.

    PubMed

    Sparrow, P R; Davies, D R

    1988-09-01

    Effects on performance of age, tenure, training level, and job complexity were investigated in a cross-sectional study using a sample of 1,308 service engineers employed by a multinational office equipment company. Two measures of job performance were derived from production record data, one relating to the quality of servicing and the other to the speed with which services were completed. Scores for each performance measure were analyzed by analysis of variance. For the quality of servicing measure, a significant main effect of age and a significant Age X Training interaction were obtained, and the relation between age and job performance took the form of an inverted U. For the speed of servicing measure, the main effects of age, tenure, training level, and job complexity were significant and there were no significant interactions. However, for both performance measures, age accounted for only a very small proportion of the variance. We discuss these results with reference to the existing literature on age and technical job performance, and conclude that training, especially if it is recent, may moderate adverse effects of age on job performance.

  12. Analysis Influence of Managerial Competence, Technical Competence, and Strategic Competence on Firm Performance in Electrical Engineering Company in Bandung

    NASA Astrophysics Data System (ADS)

    Wijaya, E. R.; Irianto, D.

    2018-03-01

    The industry sectors that have an important role in the era of globalization is the electro engineering sector. The era of globalization led to intense competition. One of the negative effects of the intense competition is declining profits. Drop in profits caused many firms reduces their employees without seeking the root cause of declining profits in detail. Whereas, employee is the important resources to maintain competitive advantage. Competitive advantage can be measured by the performance of which is owned by the firm. The firm's performance can be formed of competencies that is unique, rare, irreplaceable, and difficult to imitate within the firm, one of them is the competence of the individual. According to a competency-based approach and the resource- based approach, individual competence that affect the performance of the firm is managerial competence, technical competence, and strategic competence. Questionnaire is built based on the dimensions of the firm's performance, managerial competence, technical competence, and strategic competence, are processed using partial least squares application. The results indicate that managerial competence negatively impact firm’s performance with weak ties. The technical competence and strategic competence positively affect firm’s performance with moderate ties.

  13. A comparison of multiprocessor scheduling methods for iterative data flow architectures

    NASA Technical Reports Server (NTRS)

    Storch, Matthew

    1993-01-01

    A comparative study is made between the Algorithm to Architecture Mapping Model (ATAMM) and three other related multiprocessing models from the published literature. The primary focus of all four models is the non-preemptive scheduling of large-grain iterative data flow graphs as required in real-time systems, control applications, signal processing, and pipelined computations. Important characteristics of the models such as injection control, dynamic assignment, multiple node instantiations, static optimum unfolding, range-chart guided scheduling, and mathematical optimization are identified. The models from the literature are compared with the ATAMM for performance, scheduling methods, memory requirements, and complexity of scheduling and design procedures.

  14. CQPSO scheduling algorithm for heterogeneous multi-core DAG task model

    NASA Astrophysics Data System (ADS)

    Zhai, Wenzheng; Hu, Yue-Li; Ran, Feng

    2017-07-01

    Efficient task scheduling is critical to achieve high performance in a heterogeneous multi-core computing environment. The paper focuses on the heterogeneous multi-core directed acyclic graph (DAG) task model and proposes a novel task scheduling method based on an improved chaotic quantum-behaved particle swarm optimization (CQPSO) algorithm. A task priority scheduling list was built. A processor with minimum cumulative earliest finish time (EFT) was acted as the object of the first task assignment. The task precedence relationships were satisfied and the total execution time of all tasks was minimized. The experimental results show that the proposed algorithm has the advantage of optimization abilities, simple and feasible, fast convergence, and can be applied to the task scheduling optimization for other heterogeneous and distributed environment.

  15. Multi-Satellite Observation Scheduling for Large Area Disaster Emergency Response

    NASA Astrophysics Data System (ADS)

    Niu, X. N.; Tang, H.; Wu, L. X.

    2018-04-01

    an optimal imaging plan, plays a key role in coordinating multiple satellites to monitor the disaster area. In the paper, to generate imaging plan dynamically according to the disaster relief, we propose a dynamic satellite task scheduling method for large area disaster response. First, an initial robust scheduling scheme is generated by a robust satellite scheduling model in which both the profit and the robustness of the schedule are simultaneously maximized. Then, we use a multi-objective optimization model to obtain a series of decomposing schemes. Based on the initial imaging plan, we propose a mixed optimizing algorithm named HA_NSGA-II to allocate the decomposing results thus to obtain an adjusted imaging schedule. A real disaster scenario, i.e., 2008 Wenchuan earthquake, is revisited in terms of rapid response using satellite resources and used to evaluate the performance of the proposed method with state-of-the-art approaches. We conclude that our satellite scheduling model can optimize the usage of satellite resources so as to obtain images in disaster response in a more timely and efficient manner.

  16. 16 CFR 1404.4 - Requirements to provide performance and technical data by labeling-Notice to purchasers.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... fixtures. Do not place insulation over such fixtures so as to entrap heat. Also keep this insulation away... SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS CELLULOSE INSULATION § 1404.4 Requirements to... insulation shall give notification of performance and technical data related to performance and safety (1) to...

  17. 16 CFR 1404.4 - Requirements to provide performance and technical data by labeling-Notice to purchasers.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... fixtures. Do not place insulation over such fixtures so as to entrap heat. Also keep this insulation away... SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS CELLULOSE INSULATION § 1404.4 Requirements to... insulation shall give notification of performance and technical data related to performance and safety (1) to...

  18. 16 CFR 1404.4 - Requirements to provide performance and technical data by labeling-Notice to purchasers.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... fixtures. Do not place insulation over such fixtures so as to entrap heat. Also keep this insulation away... SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS CELLULOSE INSULATION § 1404.4 Requirements to... insulation shall give notification of performance and technical data related to performance and safety (1) to...

  19. 16 CFR 1404.4 - Requirements to provide performance and technical data by labeling-Notice to purchasers.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... fixtures. Do not place insulation over such fixtures so as to entrap heat. Also keep this insulation away... SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS CELLULOSE INSULATION § 1404.4 Requirements to... insulation shall give notification of performance and technical data related to performance and safety (1) to...

  20. Mental Health and Academic Performance among Associate Degree Nursing Students at a Technical College

    ERIC Educational Resources Information Center

    Kliminski, Kerri

    2017-01-01

    The purpose of this non-experimental cross-sectional quantitative study was to examine the relationship between mental health and academic performance among associate degree nursing (ADN) students at a Midwest technical college by identifying incidence of positive mental health, mental illness symptoms/distress, and mental illness; the…

  1. Enhancements to highway construction scheduling expert system.

    DOT National Transportation Integrated Search

    2015-05-01

    This research was performed to enhance the software tool (Illinois Construction Scheduling Expert : System, ICSES) developed in Phase I of this project (ICT project R27-86) by mining data collected on : IDOT construction projects and differentiating ...

  2. Advance Resource Provisioning in Bulk Data Scheduling

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Balman, Mehmet

    2012-10-01

    Today?s scientific and business applications generate mas- sive data sets that need to be transferred to remote sites for sharing, processing, and long term storage. Because of increasing data volumes and enhancement in current net- work technology that provide on-demand high-speed data access between collaborating institutions, data handling and scheduling problems have reached a new scale. In this paper, we present a new data scheduling model with ad- vance resource provisioning, in which data movement operations are defined with earliest start and latest comple- tion times. We analyze time-dependent resource assign- ment problem, and propose a new methodology to improvemore » the current systems by allowing researchers and higher-level meta-schedulers to use data-placement as-a-service, so they can plan ahead and submit transfer requests in advance. In general, scheduling with time and resource conflicts is NP-hard. We introduce an efficient algorithm to organize multiple requests on the fly, while satisfying users? time and resource constraints. We successfully tested our algorithm in a simple benchmark simulator that we have developed, and demonstrated its performance with initial test results.« less

  3. Automated Scheduling Via Artificial Intelligence

    NASA Technical Reports Server (NTRS)

    Biefeld, Eric W.; Cooper, Lynne P.

    1991-01-01

    Artificial-intelligence software that automates scheduling developed in Operations Mission Planner (OMP) research project. Software used in both generation of new schedules and modification of existing schedules in view of changes in tasks and/or available resources. Approach based on iterative refinement. Although project focused upon scheduling of operations of scientific instruments and other equipment aboard spacecraft, also applicable to such terrestrial problems as scheduling production in factory.

  4. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2007

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bisping, Lynn E.

    2007-01-31

    This document contains the calendar year 2007 schedule for the routine collection of samples for the Surface Environmental Surveillance Project and Drinking Water Monitoring Project. Each section includes sampling locations, sampling frequencies, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis and may not be collected in 2007 in which case the anticipated year for collection is provided. Maps showing approximate sampling locations are included for media scheduled for collection in 2007.

  5. 32 CFR 518.21 - Collection of fees and fee rates for technical data.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... AID OF CIVIL AUTHORITIES AND PUBLIC RELATIONS THE FREEDOM OF INFORMATION ACT PROGRAM Fee Schedule..., blueprints, and other technical engineering documents 2.50 Engineering data (microfilm) a. Aperture cards... mm roll film, per frame .45 d. Paper prints (engineering drawings), each 1.50 e. Paper reprints of...

  6. Compilation time analysis to minimize run-time overhead in preemptive scheduling on multiprocessors

    NASA Astrophysics Data System (ADS)

    Wauters, Piet; Lauwereins, Rudy; Peperstraete, J.

    1994-10-01

    This paper describes a scheduling method for hard real-time Digital Signal Processing (DSP) applications, implemented on a multi-processor. Due to the very high operating frequencies of DSP applications (typically hundreds of kHz) runtime overhead should be kept as small as possible. Because static scheduling introduces very little run-time overhead it is used as much as possible. Dynamic pre-emption of tasks is allowed if and only if it leads to better performance in spite of the extra run-time overhead. We essentially combine static scheduling with dynamic pre-emption using static priorities. Since we are dealing with hard real-time applications we must be able to guarantee at compile-time that all timing requirements will be satisfied at run-time. We will show that our method performs at least as good as any static scheduling method. It also reduces the total amount of dynamic pre-emptions compared with run time methods like deadline monotonic scheduling.

  7. Schedule of average annual equipment ownership expense

    DOT National Transportation Integrated Search

    2003-03-06

    The "Schedule of Average Annual Equipment Ownership Expense" is designed for use on Force Account bills of Contractors performing work for the Illinois Department of Transportation and local government agencies who choose to adopt these rates. This s...

  8. Optimal pre-scheduling of problem remappings

    NASA Technical Reports Server (NTRS)

    Nicol, David M.; Saltz, Joel H.

    1987-01-01

    A large class of scientific computational problems can be characterized as a sequence of steps where a significant amount of computation occurs each step, but the work performed at each step is not necessarily identical. Two good examples of this type of computation are: (1) regridding methods which change the problem discretization during the course of the computation, and (2) methods for solving sparse triangular systems of linear equations. Recent work has investigated a means of mapping such computations onto parallel processors; the method defines a family of static mappings with differing degrees of importance placed on the conflicting goals of good load balance and low communication/synchronization overhead. The performance tradeoffs are controllable by adjusting the parameters of the mapping method. To achieve good performance it may be necessary to dynamically change these parameters at run-time, but such changes can impose additional costs. If the computation's behavior can be determined prior to its execution, it can be possible to construct an optimal parameter schedule using a low-order-polynomial-time dynamic programming algorithm. Since the latter can be expensive, the performance is studied of the effect of a linear-time scheduling heuristic on one of the model problems, and it is shown to be effective and nearly optimal.

  9. Scheduling algorithm for data relay satellite optical communication based on artificial intelligent optimization

    NASA Astrophysics Data System (ADS)

    Zhao, Wei-hu; Zhao, Jing; Zhao, Shang-hong; Li, Yong-jun; Wang, Xiang; Dong, Yi; Dong, Chen

    2013-08-01

    Optical satellite communication with the advantages of broadband, large capacity and low power consuming broke the bottleneck of the traditional microwave satellite communication. The formation of the Space-based Information System with the technology of high performance optical inter-satellite communication and the realization of global seamless coverage and mobile terminal accessing are the necessary trend of the development of optical satellite communication. Considering the resources, missions and restraints of Data Relay Satellite Optical Communication System, a model of optical communication resources scheduling is established and a scheduling algorithm based on artificial intelligent optimization is put forwarded. According to the multi-relay-satellite, multi-user-satellite, multi-optical-antenna and multi-mission with several priority weights, the resources are scheduled reasonable by the operation: "Ascertain Current Mission Scheduling Time" and "Refresh Latter Mission Time-Window". The priority weight is considered as the parameter of the fitness function and the scheduling project is optimized by the Genetic Algorithm. The simulation scenarios including 3 relay satellites with 6 optical antennas, 12 user satellites and 30 missions, the simulation result reveals that the algorithm obtain satisfactory results in both efficiency and performance and resources scheduling model and the optimization algorithm are suitable in multi-relay-satellite, multi-user-satellite, and multi-optical-antenna recourses scheduling problem.

  10. Hybrid Rendering with Scheduling under Uncertainty

    PubMed Central

    Tamm, Georg; Krüger, Jens

    2014-01-01

    As scientific data of increasing size is generated by today’s simulations and measurements, utilizing dedicated server resources to process the visualization pipeline becomes necessary. In a purely server-based approach, requirements on the client-side are minimal as the client only displays results received from the server. However, the client may have a considerable amount of hardware available, which is left idle. Further, the visualization is put at the whim of possibly unreliable server and network conditions. Server load, bandwidth and latency may substantially affect the response time on the client. In this paper, we describe a hybrid method, where visualization workload is assigned to server and client. A capable client can produce images independently. The goal is to determine a workload schedule that enables a synergy between the two sides to provide rendering results to the user as fast as possible. The schedule is determined based on processing and transfer timings obtained at runtime. Our probabilistic scheduler adapts to changing conditions by shifting workload between server and client, and accounts for the performance variability in the dynamic system. PMID:25309115

  11. Interactive computer aided shift scheduling.

    PubMed

    Gaertner, J

    2001-12-01

    This paper starts with a discussion of computer aided shift scheduling. After a brief review of earlier approaches, two conceptualizations of this field are introduced: First, shift scheduling as a field that ranges from extremely stable rosters at one pole to rather market-like approaches on the other pole. Unfortunately, already small alterations of a scheduling problem (e.g., the number of groups, the number of shifts) may call for rather different approaches and tools. Second, their environment shapes scheduling problems and scheduling has to be done within idiosyncratic organizational settings. This calls for the amalgamation of scheduling with other tasks (e.g., accounting) and for reflections whether better solutions might become possible by changes in the problem definition (e.g., other service levels, organizational changes). Therefore shift scheduling should be understood as a highly connected problem. Building upon these two conceptualizations, a few examples of software that ease scheduling in some areas of this field are given and future research questions are outlined.

  12. Key team physical and technical performance indicators indicative of team quality in the soccer Chinese super league.

    PubMed

    Yang, Gai; Leicht, Anthony S; Lago, Carlos; Gómez, Miguel-Ángel

    2018-01-01

    The aim of this study was to identify the key physical and technical performance variables related to team quality in the Chinese Super League (CSL). Teams' performance variables were collected from 240 matches and analysed via analysis of variance between end-of-season-ranked groups and multinomial logistic regression. Significant physical performance differences between groups were identified for sprinting (top-ranked group vs. upper-middle-ranked group) and total distance covered without possession (upper and upper-middle-ranked groups and lower-ranked group). For technical performance, teams in the top-ranked group exhibited a significantly greater amount of possession in opponent's half, number of entry passes in the final 1/3 of the field and the Penalty Area, and 50-50 challenges than lower-ranked teams. Finally, time of possession increased the probability of a win compared with a draw. The current study identified key performance indicators that differentiated end-season team quality within the CSL.

  13. Coordinating space telescope operations in an integrated planning and scheduling architecture

    NASA Technical Reports Server (NTRS)

    Muscettola, Nicola; Smith, Stephen F.; Cesta, Amedeo; D'Aloisi, Daniela

    1992-01-01

    The Heuristic Scheduling Testbed System (HSTS), a software architecture for integrated planning and scheduling, is discussed. The architecture has been applied to the problem of generating observation schedules for the Hubble Space Telescope. This problem is representative of the class of problems that can be addressed: their complexity lies in the interaction of resource allocation and auxiliary task expansion. The architecture deals with this interaction by viewing planning and scheduling as two complementary aspects of the more general process of constructing behaviors of a dynamical system. The principal components of the software architecture are described, indicating how to model the structure and dynamics of a system, how to represent schedules at multiple levels of abstraction in the temporal database, and how the problem solving machinery operates. A scheduler for the detailed management of Hubble Space Telescope operations that has been developed within HSTS is described. Experimental performance results are given that indicate the utility and practicality of the approach.

  14. Novel Hybrid Scheduling Technique for Sensor Nodes with Mixed Criticality Tasks.

    PubMed

    Micea, Mihai-Victor; Stangaciu, Cristina-Sorina; Stangaciu, Valentin; Curiac, Daniel-Ioan

    2017-06-26

    Sensor networks become increasingly a key technology for complex control applications. Their potential use in safety- and time-critical domains has raised the need for task scheduling mechanisms specially adapted to sensor node specific requirements, often materialized in predictable jitter-less execution of tasks characterized by different criticality levels. This paper offers an efficient scheduling solution, named Hybrid Hard Real-Time Scheduling (H²RTS), which combines a static, clock driven method with a dynamic, event driven scheduling technique, in order to provide high execution predictability, while keeping a high node Central Processing Unit (CPU) utilization factor. From the detailed, integrated schedulability analysis of the H²RTS, a set of sufficiency tests are introduced and demonstrated based on the processor demand and linear upper bound metrics. The performance and correct behavior of the proposed hybrid scheduling technique have been extensively evaluated and validated both on a simulator and on a sensor mote equipped with ARM7 microcontroller.

  15. Novel Hybrid Scheduling Technique for Sensor Nodes with Mixed Criticality Tasks

    PubMed Central

    Micea, Mihai-Victor; Stangaciu, Cristina-Sorina; Stangaciu, Valentin; Curiac, Daniel-Ioan

    2017-01-01

    Sensor networks become increasingly a key technology for complex control applications. Their potential use in safety- and time-critical domains has raised the need for task scheduling mechanisms specially adapted to sensor node specific requirements, often materialized in predictable jitter-less execution of tasks characterized by different criticality levels. This paper offers an efficient scheduling solution, named Hybrid Hard Real-Time Scheduling (H2RTS), which combines a static, clock driven method with a dynamic, event driven scheduling technique, in order to provide high execution predictability, while keeping a high node Central Processing Unit (CPU) utilization factor. From the detailed, integrated schedulability analysis of the H2RTS, a set of sufficiency tests are introduced and demonstrated based on the processor demand and linear upper bound metrics. The performance and correct behavior of the proposed hybrid scheduling technique have been extensively evaluated and validated both on a simulator and on a sensor mote equipped with ARM7 microcontroller. PMID:28672856

  16. Use of Perceive, Recall, Plan, Perform Stage Two Cognitive Task Analysis for Students with Autism and Intellectual Disability: The Impact of a Sensory Activity Schedule

    ERIC Educational Resources Information Center

    Mills, Caroline; Chapparo, Christine

    2017-01-01

    The aim of this study was to determine the impact of a classroom sensory activity schedule (SAS) on cognitive strategy use during task performance. This work studies a single-system AB research design with seven students with autism and intellectual disability. Repeated measures using the Perceive, Recall, Plan and Perform (PRPP) Cognitive Task…

  17. Associations between employees' work schedules and the vocational consequences of workplace injuries.

    PubMed

    Dembe, Allard E; Delbos, Rachel; Erickson, J Bianca; Banks, Steven M

    2007-12-01

    This study examines the effect of long-hour work schedules and nonstandard shift work (e.g., night and evening shifts) on the ability of injured workers to maintain productive employment following a workplace injury. Analyses were based on 13 years of data from the National Longitudinal Survey of Youth. Multivariate logistic regression analyses were performed with one of ten nonstandard schedules as the independent variable and a particular vocational consequences as the dependent variable. Vocational consequences included being unable to perform normal job duties, temporary job reassignment, working less than full time, filing a workers' compensation claim, and quitting or being fired because of the injury. Covariates in the regression model included age, gender, occupation, industry, and region. The most prominent effects of working a nonstandard schedule were a increased risk of being fired (OR = 1.81; 1.15-2.90 CI 95%), quitting (OR = 1.68; 1.20-2.36 CI 95%), or being unable to work full time (OR = 1.33; 1.08-1.64 CI 95%) following an injury, compared to injured workers in conventional schedules. Schedules involving overtime and long working hours generally had a greater impact on vocational consequences following a workplace injury than did schedules involving night, evening, and other nonstandard shift work. Occupational rehabilitation professionals need to consider the specific type of work schedule when developing effective return-to-work plans for injured workers. Special precautions need to be taken for workers returning to schedules that involve more than 12 h per day, 60 h per week, and long commutes.

  18. The Future Cybersecurity Workforce: Going Beyond Technical Skills for Successful Cyber Performance

    PubMed Central

    Dawson, Jessica; Thomson, Robert

    2018-01-01

    One of the challenges in writing an article reviewing the current state of cyber education and workforce development is that there is a paucity of quantitative assessment regarding the cognitive aptitudes, work roles, or team organization required by cybersecurity professionals to be successful. In this review, we argue that the people who operate within the cyber domain need a combination of technical skills, domain specific knowledge, and social intelligence to be successful. They, like the networks they operate, must also be reliable, trustworthy, and resilient. Defining the knowledge, skills, attributes, and other characteristics is not as simple as defining a group of technical skills that people can be trained on; the complexity of the cyber domain makes this a unique challenge. There has been little research devoted to exactly what attributes individuals in the cyber domain need. What research does exist places an emphasis on technical and engineering skills while discounting the important social and organizational influences that dictate success or failure in everyday settings. This paper reviews the literature on cyber expertise and cyber workforce development to identify gaps and then argues for the important contribution of social fit in the highly complex and heterogenous cyber workforce. We then identify six assumptions for the future of cybersecurity workforce development, including the requirement for systemic thinkers, team players, a love for continued learning, strong communication ability, a sense of civic duty, and a blend of technical and social skill. Finally, we make recommendations for social and cognitive metrics which may be indicative of future performance in cyber work roles to provide a roadmap for future scholars. PMID:29946276

  19. The Future Cybersecurity Workforce: Going Beyond Technical Skills for Successful Cyber Performance.

    PubMed

    Dawson, Jessica; Thomson, Robert

    2018-01-01

    One of the challenges in writing an article reviewing the current state of cyber education and workforce development is that there is a paucity of quantitative assessment regarding the cognitive aptitudes, work roles, or team organization required by cybersecurity professionals to be successful. In this review, we argue that the people who operate within the cyber domain need a combination of technical skills, domain specific knowledge, and social intelligence to be successful. They, like the networks they operate, must also be reliable, trustworthy, and resilient. Defining the knowledge, skills, attributes, and other characteristics is not as simple as defining a group of technical skills that people can be trained on; the complexity of the cyber domain makes this a unique challenge. There has been little research devoted to exactly what attributes individuals in the cyber domain need. What research does exist places an emphasis on technical and engineering skills while discounting the important social and organizational influences that dictate success or failure in everyday settings. This paper reviews the literature on cyber expertise and cyber workforce development to identify gaps and then argues for the important contribution of social fit in the highly complex and heterogenous cyber workforce. We then identify six assumptions for the future of cybersecurity workforce development, including the requirement for systemic thinkers, team players, a love for continued learning, strong communication ability, a sense of civic duty, and a blend of technical and social skill. Finally, we make recommendations for social and cognitive metrics which may be indicative of future performance in cyber work roles to provide a roadmap for future scholars.

  20. Improving Resource Selection and Scheduling Using Predictions. Chapter 1

    NASA Technical Reports Server (NTRS)

    Smith, Warren

    2003-01-01

    The introduction of computational grids has resulted in several new problems in the area of scheduling that can be addressed using predictions. The first problem is selecting where to run an application on the many resources available in a grid. Our approach to help address this problem is to provide predictions of when an application would start to execute if submitted to specific scheduled computer systems. The second problem is gaining simultaneous access to multiple computer systems so that distributed applications can be executed. We help address this problem by investigating how to support advance reservations in local scheduling systems. Our approaches to both of these problems are based on predictions for the execution time of applications on space- shared parallel computers. As a side effect of this work, we also discuss how predictions of application run times can be used to improve scheduling performance.

  1. Particle swarm optimization based space debris surveillance network scheduling

    NASA Astrophysics Data System (ADS)

    Jiang, Hai; Liu, Jing; Cheng, Hao-Wen; Zhang, Yao

    2017-02-01

    The increasing number of space debris has created an orbital debris environment that poses increasing impact risks to existing space systems and human space flights. For the safety of in-orbit spacecrafts, we should optimally schedule surveillance tasks for the existing facilities to allocate resources in a manner that most significantly improves the ability to predict and detect events involving affected spacecrafts. This paper analyzes two criteria that mainly affect the performance of a scheduling scheme and introduces an artificial intelligence algorithm into the scheduling of tasks of the space debris surveillance network. A new scheduling algorithm based on the particle swarm optimization algorithm is proposed, which can be implemented in two different ways: individual optimization and joint optimization. Numerical experiments with multiple facilities and objects are conducted based on the proposed algorithm, and simulation results have demonstrated the effectiveness of the proposed algorithm.

  2. 78 FR 11179 - Auction of Lower and Upper Paging Bands Licenses Scheduled for July 16, 2013; Comment Sought on...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-15

    ... investigating and evaluating all technical and marketplace factors that may have a bearing on the value of the... cooperate, collaborate, or communicate, including discussing bids, bidding strategies, or post-auction... schedule in order to foster an auction pace that reasonably balances speed with the bidders' need to study...

  3. Avoiding Biased-Feeding in the Scheduling of Collaborative Multipath TCP.

    PubMed

    Tsai, Meng-Hsun; Chou, Chien-Ming; Lan, Kun-Chan

    2016-01-01

    Smartphones have become the major communication and portable computing devices that access the Internet through Wi-Fi or mobile networks. Unfortunately, users without a mobile data subscription can only access the Internet at limited locations, such as hotspots. In this paper, we propose a collaborative bandwidth sharing protocol (CBSP) built on top of MultiPath TCP (MPTCP). CBSP enables users to buy bandwidth on demand from neighbors (called Helpers) and uses virtual interfaces to bind the subflows of MPTCP to avoid modifying the implementation of MPTCP. However, although MPTCP provides the required multi-homing functionality for bandwidth sharing, the current packet scheduling in collaborative MPTCP (e.g., Co-MPTCP) leads to the so-called biased-feeding problem. In this problem, the fastest link might always be selected to send packets whenever it has available cwnd, which results in other links not being fully utilized. In this work, we set out to design an algorithm, called Scheduled Window-based Transmission Control (SWTC), to improve the performance of packet scheduling in MPTCP, and we perform extensive simulations to evaluate its performance.

  4. Avoiding Biased-Feeding in the Scheduling of Collaborative Multipath TCP

    PubMed Central

    2016-01-01

    Smartphones have become the major communication and portable computing devices that access the Internet through Wi-Fi or mobile networks. Unfortunately, users without a mobile data subscription can only access the Internet at limited locations, such as hotspots. In this paper, we propose a collaborative bandwidth sharing protocol (CBSP) built on top of MultiPath TCP (MPTCP). CBSP enables users to buy bandwidth on demand from neighbors (called Helpers) and uses virtual interfaces to bind the subflows of MPTCP to avoid modifying the implementation of MPTCP. However, although MPTCP provides the required multi-homing functionality for bandwidth sharing, the current packet scheduling in collaborative MPTCP (e.g., Co-MPTCP) leads to the so-called biased-feeding problem. In this problem, the fastest link might always be selected to send packets whenever it has available cwnd, which results in other links not being fully utilized. In this work, we set out to design an algorithm, called Scheduled Window-based Transmission Control (SWTC), to improve the performance of packet scheduling in MPTCP, and we perform extensive simulations to evaluate its performance. PMID:27529783

  5. Operations research methods improve chemotherapy patient appointment scheduling.

    PubMed

    Santibáñez, Pablo; Aristizabal, Ruben; Puterman, Martin L; Chow, Vincent S; Huang, Wenhai; Kollmannsberger, Christian; Nordin, Travis; Runzer, Nancy; Tyldesley, Scott

    2012-12-01

    Clinical complexity, scheduling restrictions, and outdated manual booking processes resulted in frequent clerical rework, long waitlists for treatment, and late appointment notification for patients at a chemotherapy clinic in a large cancer center in British Columbia, Canada. A 17-month study was conducted to address booking, scheduling and workload issues and to develop, implement, and evaluate solutions. A review of scheduling practices included process observation and mapping, analysis of historical appointment data, creation of a new performance metric (final appointment notification lead time), and a baseline patient satisfaction survey. Process improvement involved discrete event simulation to evaluate alternative booking practice scenarios, development of an optimization-based scheduling tool to improve scheduling efficiency, and change management for implementation of process changes. Results were evaluated through analysis of appointment data, a follow-up patient survey, and staff surveys. Process review revealed a two-stage scheduling process. Long waitlists and late notification resulted from an inflexible first-stage process. The second-stage process was time consuming and tedious. After a revised, more flexible first-stage process and an automated second-stage process were implemented, the median percentage of appointments exceeding the final appointment notification lead time target of one week was reduced by 57% and median waitlist size decreased by 83%. Patient surveys confirmed increased satisfaction while staff feedback reported reduced stress levels. Significant operational improvements can be achieved through process redesign combined with operations research methods.

  6. The TJO-OAdM Robotic Observatory: the scheduler

    NASA Astrophysics Data System (ADS)

    Colomé, Josep; Casteels, Kevin; Ribas, Ignasi; Francisco, Xavier

    2010-07-01

    The Joan Oró Telescope at the Montsec Astronomical Observatory (TJO - OAdM) is a small-class observatory working under completely unattended control, due to the isolation of the site. Robotic operation is mandatory for its routine use. The level of robotization of an observatory is given by its reliability in responding to environment changes and by the required human interaction due to possible alarms. These two points establish a level of human attendance to ensure low risk at any time. But there is another key point when deciding how the system performs as a robot: the capability to adapt the scheduled observation to actual conditions. The scheduler represents a fundamental element to fully achieve an intelligent response at any time. Its main task is the mid- and short-term time optimization and it has a direct effect on the scientific return achieved by the observatory. We present a description of the scheduler developed for the TJO - OAdM, which is separated in two parts. Firstly, a pre-scheduler that makes a temporary selection of objects from the available projects according to their possibility of observation. This process is carried out before the beginning of the night following different selection criteria. Secondly, a dynamic scheduler that is executed any time a target observation is complete and a new one must be scheduled. The latter enables the selection of the best target in real time according to actual environment conditions and the set of priorities.

  7. Performance Analysis of Physical Layer Security of Opportunistic Scheduling in Multiuser Multirelay Cooperative Networks

    PubMed Central

    Shim, Kyusung; Do, Nhu Tri; An, Beongku

    2017-01-01

    In this paper, we study the physical layer security (PLS) of opportunistic scheduling for uplink scenarios of multiuser multirelay cooperative networks. To this end, we propose a low-complexity, yet comparable secrecy performance source relay selection scheme, called the proposed source relay selection (PSRS) scheme. Specifically, the PSRS scheme first selects the least vulnerable source and then selects the relay that maximizes the system secrecy capacity for the given selected source. Additionally, the maximal ratio combining (MRC) technique and the selection combining (SC) technique are considered at the eavesdropper, respectively. Investigating the system performance in terms of secrecy outage probability (SOP), closed-form expressions of the SOP are derived. The developed analysis is corroborated through Monte Carlo simulation. Numerical results show that the PSRS scheme significantly improves the secure ability of the system compared to that of the random source relay selection scheme, but does not outperform the optimal joint source relay selection (OJSRS) scheme. However, the PSRS scheme drastically reduces the required amount of channel state information (CSI) estimations compared to that required by the OJSRS scheme, specially in dense cooperative networks. PMID:28212286

  8. Technical tips to perform safe and effective ultrasound guided steroid joint injections in children.

    PubMed

    Parra, Dimitri A

    2015-01-01

    The aim of this article is to describe the technique used to perform ultrasound guided steroid joint injections in children in a group of joints that can be injected using ultrasound as the only image guidance modality. The technique is described and didactic figures are provided to illustrate key technical concepts. It is very important to be familiar with the sonographic appearance of the pediatric joints and the developing bone when performing ultrasound-guided joint injections in children.

  9. Distributed network scheduling

    NASA Technical Reports Server (NTRS)

    Clement, Bradley J.; Schaffer, Steven R.

    2004-01-01

    Distributed Network Scheduling is the scheduling of future communications of a network by nodes in the network. This report details software for doing this onboard spacecraft in a remote network. While prior work on distributed scheduling has been applied to remote spacecraft networks, the software reported here focuses on modeling communication activities in greater detail and including quality of service constraints. Our main results are based on a Mars network of spacecraft and include identifying a maximum opportunity of improving traverse exploration rate a factor of three; a simulation showing reduction in one-way delivery times from a rover to Earth from as much as 5 to 1.5 hours; simulated response to unexpected events averaging under an hour onboard; and ground schedule generation ranging from seconds to 50 minutes for 15 to 100 communication goals.

  10. Cloud computing task scheduling strategy based on improved differential evolution algorithm

    NASA Astrophysics Data System (ADS)

    Ge, Junwei; He, Qian; Fang, Yiqiu

    2017-04-01

    In order to optimize the cloud computing task scheduling scheme, an improved differential evolution algorithm for cloud computing task scheduling is proposed. Firstly, the cloud computing task scheduling model, according to the model of the fitness function, and then used improved optimization calculation of the fitness function of the evolutionary algorithm, according to the evolution of generation of dynamic selection strategy through dynamic mutation strategy to ensure the global and local search ability. The performance test experiment was carried out in the CloudSim simulation platform, the experimental results show that the improved differential evolution algorithm can reduce the cloud computing task execution time and user cost saving, good implementation of the optimal scheduling of cloud computing tasks.

  11. Scheduling Accessory Assists Patients with Cognitive Disorders

    NASA Technical Reports Server (NTRS)

    2007-01-01

    Recom Technologies Inc. received initial funding from NASA to research the commercial potential of an artificially intelligent planning reaction model to serve as a tool to help individuals suffering from various forms and levels of brain impairment. In 1993, the chief of the Artificial Intelligence Research Branch at Ames Research Center suggested collaborative research with Santa Clara Valley Medical Center. This partnership led to further development of the technology and funding to support clinical research from the U.S. Department of Education's National Institute on Disability and Rehabilitation Research. In 1996, Attention Control Systems Inc. was founded to market the finished device, called the Planning and Execution Assistant and Trainer (PEAT). PEAT is a pocket-sized PDA-like device with a graphical display, touchscreen controls, an electronic calendar, an address book, and a built-in phone, that cues users to start or stop scheduled activities, monitors their progress, and adjusts schedules as necessary in response to delays or calendar changes. It uses an automatic planning model developed for NASA to adjust daily plans when a situation changes. PEAT is sold as a complete system that includes software, hardware, documentation, and technical support. In addition to the flagship Pocket PEAT device, there is PEAT Phone, PC PEAT, and PEAT Link. Clinical studies of PEAT continue at Santa Clara Valley Medical Center

  12. NASA Schedule Management Handbook

    NASA Technical Reports Server (NTRS)

    2011-01-01

    The purpose of schedule management is to provide the framework for time-phasing, resource planning, coordination, and communicating the necessary tasks within a work effort. The intent is to improve schedule management by providing recommended concepts, processes, and techniques used within the Agency and private industry. The intended function of this handbook is two-fold: first, to provide guidance for meeting the scheduling requirements contained in NPR 7120.5, NASA Space Flight Program and Project Management Requirements, NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Requirements, NPR 7120.8, NASA Research and Technology Program and Project Management Requirements, and NPD 1000.5, Policy for NASA Acquisition. The second function is to describe the schedule management approach and the recommended best practices for carrying out this project control function. With regards to the above project management requirements documents, it should be noted that those space flight projects previously established and approved under the guidance of prior versions of NPR 7120.5 will continue to comply with those requirements until project completion has been achieved. This handbook will be updated as needed, to enhance efficient and effective schedule management across the Agency. It is acknowledged that most, if not all, external organizations participating in NASA programs/projects will have their own internal schedule management documents. Issues that arise from conflicting schedule guidance will be resolved on a case by case basis as contracts and partnering relationships are established. It is also acknowledged and understood that all projects are not the same and may require different levels of schedule visibility, scrutiny and control. Project type, value, and complexity are factors that typically dictate which schedule management practices should be employed.

  13. FlexMod Scheduling Redux

    ERIC Educational Resources Information Center

    Murray, Shannon

    2008-01-01

    Flexible modular scheduling (flex mod)--a schedule philosophy and system that has been in place at Wausau West High School in Wausau, Wisconsin, for the last 35 years and aligns nicely with current research on student learning--is getting more and more attention from high school administrators across the country. Flexible modular scheduling was…

  14. Permutation flow-shop scheduling problem to optimize a quadratic objective function

    NASA Astrophysics Data System (ADS)

    Ren, Tao; Zhao, Peng; Zhang, Da; Liu, Bingqian; Yuan, Huawei; Bai, Danyu

    2017-09-01

    A flow-shop scheduling model enables appropriate sequencing for each job and for processing on a set of machines in compliance with identical processing orders. The objective is to achieve a feasible schedule for optimizing a given criterion. Permutation is a special setting of the model in which the processing order of the jobs on the machines is identical for each subsequent step of processing. This article addresses the permutation flow-shop scheduling problem to minimize the criterion of total weighted quadratic completion time. With a probability hypothesis, the asymptotic optimality of the weighted shortest processing time schedule under a consistency condition (WSPT-CC) is proven for sufficiently large-scale problems. However, the worst case performance ratio of the WSPT-CC schedule is the square of the number of machines in certain situations. A discrete differential evolution algorithm, where a new crossover method with multiple-point insertion is used to improve the final outcome, is presented to obtain high-quality solutions for moderate-scale problems. A sequence-independent lower bound is designed for pruning in a branch-and-bound algorithm for small-scale problems. A set of random experiments demonstrates the performance of the lower bound and the effectiveness of the proposed algorithms.

  15. What 50 Years of Research Tell Us About Pausing Under Ratio Schedules of Reinforcement

    PubMed Central

    Schlinger, Henry D; Derenne, Adam; Baron, Alan

    2008-01-01

    Textbooks in learning and behavior commonly describe performance on fixed-ratio schedules as “break and run,” indicating that after reinforcement subjects typically pause and then respond quickly to the next reinforcement. Performance on variable-ratio schedules, on the other hand, is described as steady and fast, with few long pauses. Beginning with Ferster and Skinner's magnum opus, Schedules of Reinforcement (1957), the literature on pausing under ratio schedules has identified the influences on pausing of numerous important variables, in particular ratio size and reinforcement magnitude. As a result, some previously held assumptions have been called into question. For example, research has shown that the length of the pause is controlled not only by the preceding ratio, as Ferster and Skinner and others had assumed (and as implied by the phrase postreinforcement pause), but by the upcoming ratio as well. Similarly, despite the commonly held belief that ratio pausing is unique to the fixed-ratio schedule, there is evidence that pausing also occurs under variable-ratio schedules. If such widely held beliefs are incorrect, then what about other assumptions? This article selectively examines the literature on pausing under ratio schedules over the past 50 years and concludes that although there may indeed be some common patterns, there are also inconsistencies that await future resolution. Several accounts of pausing under ratio schedules are discussed along with the implications of the literature for human performances, most notably the behaviors termed procrastination. PMID:22478501

  16. A mathematical model for evaluating the impact of vaccination schedules: application to Neisseria meningitidis.

    PubMed

    Tuckwell, H C; Hanslik, T; Valleron, A J; Flahault, A

    2003-06-01

    A mathematical model is described which determines the impact of a schedule of vaccination on the time course of a certain class of diseases. The data are the demographic variables and parameters and age-dependent non-fatal and fatal case rates. Given the age- and time-dependent rates of vaccination including coverage and corresponding efficacies, various schedules may be distinguished by either the absolute numbers of cases and deaths avoided or the numbers of cases and deaths avoided per dose of vaccine. The model was applied to meningo-coccal serogroup C disease in France. The outcomes of six different vaccination schedules were examined. In absolute terms, a schedule in which all individuals aged between 2 and 20 years were vaccinated performed best, but this schedule and that in which only 1-year olds were vaccinated performed equally and best in terms of cases prevented, but not lives saved, per dose.

  17. Can We Predict Technical Aptitude?: A Systematic Review.

    PubMed

    Louridas, Marisa; Szasz, Peter; de Montbrun, Sandra; Harris, Kenneth A; Grantcharov, Teodor P

    2016-04-01

    To identify background characteristics and cognitive tests that may predict surgical trainees' future technical performance, and therefore be used to supplement existing surgical residency selection criteria. Assessment of technical skills is not commonly incorporated as part of the selection process for surgical trainees in North America. Emerging evidence, however, suggests that not all trainees are capable of reaching technical competence. Therefore, incorporating technical aptitude into selection processes may prove useful. A systematic search was carried out of the MEDLINE, PsycINFO, and Embase online databases to identify all studies that assessed associations between surrogate markers of innate technical abilities in surgical trainees, and whether these abilities correlate with technical performance. The quality of each study was evaluated using the Grading of Recommendations, Assessment, Development, and Evaluation system. A total of 8035 records were identified. After screening by title, abstract, and full text, 52 studies were included. Very few surrogate markers were found to predict technical performance. Significant associations with technical performance were seen for 1 of 23 participant-reported surrogate markers, 2 of 25 visual spatial tests, and 2 of 19 dexterity tests. The assessment of trainee Basic Performance Resources predicted technical performance in 62% and 75% of participants. To date, no single test has been shown to reliably predict the technical performance of surgical trainees. Strategies that rely on assessing multiple innate abilities, their interaction, and their relationship with technical skill may ultimately be more likely to serve as reliable predictors of future surgical performance.

  18. Automating the self-scheduling process of nurses in Swedish healthcare: a pilot study.

    PubMed

    Rönnberg, Elina; Larsson, Torbjörn

    2010-03-01

    Hospital wards need to be staffed by nurses round the clock, resulting in irregular working hours for many nurses. Over the years, the nurses' influence on the scheduling has been increased in order to improve their working conditions. In Sweden it is common to apply a kind of self-scheduling where each nurse individually proposes a schedule, and then the final schedule is determined through informal negotiations between the nurses. This kind of self-scheduling is very time-consuming and does often lead to conflicts. We present a pilot study which aims at determining if it is possible to create an optimisation tool that automatically delivers a usable schedule based on the schedules proposed by the nurses. The study is performed at a typical Swedish nursing ward, for which we have developed a mathematical model and delivered schedules. The results of this study are very promising and suggest continued work along these lines.

  19. Technical indicators of economic performance in dairy sheep farming.

    PubMed

    Theodoridis, A; Ragkos, A; Roustemis, D; Arsenos, G; Abas, Z; Sinapis, E

    2014-01-01

    In this study, the level of technical efficiency of 58 sheep farms rearing the Chios breed in Greece was measured through the application of the stochastic frontier analysis method. A Translog stochastic frontier production function was estimated using farm accounting data of Chios sheep farms and the impact of various socio-demographic and biophysical factors on the estimated efficiency of the farms was evaluated. The farms were classified into efficiency groups on the basis of the estimated level of efficiency and a technical and economic descriptive analysis was applied in order to illustrate an indicative picture of their structure and productivity. The results of the stochastic frontier model indicate that there are substantial production inefficiencies among the Chios sheep farms and that these farms could increase their production through the improvement of technical efficiency, whereas the results of the inefficiency effects model reveal that the farm-specific explanatory factors can partly explain the observed efficiency differentials. The measurement of technical inefficiency and the detection of its determinants can be used to form the basis of policy recommendations that could contribute to the development of the sector.

  20. Use of computerized interview scheduling program for pediatric surgery match applicants.

    PubMed

    Stephens, Caroline Q; Hamilton, Nicholas A; Thompson, Ann E; Krishnaswami, Sanjay

    2017-06-01

    Pediatric surgery fellowship applicants and programs coordinate over 20 interviews per cycle. We hypothesized that replacing e-mail and phone communication with a computerized-scheduling program (CSP) could benefit both parties. We used a CSP to schedule 2016 interviews. Time to schedule and e-mail communication per applicant was compared to 2015, when traditional scheduling was used. Additionally, 2016 interviewees were surveyed about their experience with the CSP vs. traditional means. Analysis was performed using descriptive statistics and a Student's T-test. We found a significant decrease in mean scheduling time from 14.4 to 1.7h (p<0.001) and in e-mails exchanged from 3.4 to 1.0 (p<0.0001). Survey respondents reported 92% satisfaction with the CSP, and 87% found it easier to schedule interviews. Applicants also reported quicker finalization of interview dates (96%), improved access to interview slots (71%), and easier coordination of additional services and time off (63%). Notably, the mean longest time reported to schedule interviews using traditional methods was 7days (range 1-30). Overall, 84% supported widespread adoption of CSPs. Using CSPs improved the scheduling process for the significant majority of interviewees, and our program. If widely adopted, this could greatly improve the efficiency of pediatric surgery interview scheduling. N/A. Copyright © 2017 Elsevier Inc. All rights reserved.

  1. Scheduling rules to achieve lead-time targets in outpatient appointment systems.

    PubMed

    Nguyen, Thu-Ba T; Sivakumar, Appa Iyer; Graves, Stephen C

    2017-12-01

    This paper considers how to schedule appointments for outpatients, for a clinic that is subject to appointment lead-time targets for both new and returning patients. We develop heuristic rules, which are the exact and relaxed appointment scheduling rules, to schedule each new patient appointment (only) in light of uncertainty about future arrivals. The scheduling rules entail two decisions. First, the rules need to determine whether or not a patient's request can be accepted; then, if the request is not rejected, the rules prescribe how to assign the patient to an available slot. The intent of the scheduling rules is to maximize the utilization of the planned resource (i.e., the physician staff), or equivalently to maximize the number of patients that are admitted, while maintaining the service targets on the median, the 95th percentile, and the maximum appointment lead-times. We test the proposed scheduling rules with numerical experiments using real data from the chosen clinic of Tan Tock Seng hospital in Singapore. The results show the efficiency and the efficacy of the scheduling rules, in terms of the service-target satisfaction and the resource utilization. From the sensitivity analysis, we find that the performance of the proposed scheduling rules is fairly robust to the specification of the established lead-time targets.

  2. An Online Scheduling Algorithm with Advance Reservation for Large-Scale Data Transfers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Balman, Mehmet; Kosar, Tevfik

    Scientific applications and experimental facilities generate massive data sets that need to be transferred to remote collaborating sites for sharing, processing, and long term storage. In order to support increasingly data-intensive science, next generation research networks have been deployed to provide high-speed on-demand data access between collaborating institutions. In this paper, we present a practical model for online data scheduling in which data movement operations are scheduled in advance for end-to-end high performance transfers. In our model, data scheduler interacts with reservation managers and data transfer nodes in order to reserve available bandwidth to guarantee completion of jobs that aremore » accepted and confirmed to satisfy preferred time constraint given by the user. Our methodology improves current systems by allowing researchers and higher level meta-schedulers to use data placement as a service where theycan plan ahead and reserve the scheduler time in advance for their data movement operations. We have implemented our algorithm and examined possible techniques for incorporation into current reservation frameworks. Performance measurements confirm that the proposed algorithm is efficient and scalable.« less

  3. Technical quality of root canal treatment performed by undergraduate students using hand instrumentation: a meta-analysis.

    PubMed

    Ribeiro, D M; Réus, J C; Felippe, W T; Pacheco-Pereira, C; Dutra, K L; Santos, J N; Porporatti, A L; De Luca Canto, G

    2018-03-01

    The technical quality of root canal treatment (RCT) may impact on the outcome. The quality of education received during undergraduate school may be linked to the quality of treatment provided in general dental practice. In this context, the aim of this systematic review was to answer the following focused questions: (i) What is the frequency of acceptable technical quality of root fillings, assessed radiographically, performed by undergraduate students? (ii) What are the most common errors assessed radiographically and reported in these treatments? For this purpose, articles that evaluated the quality of root fillings performed by undergraduate students were selected. Data were collected based on predetermined criteria. The key features from the included studies were extracted. GRADE-tool assessed the quality of the evidence. MAStARI evaluated the methodological quality, and a meta-analysis on all studies was conducted. At the end of the screening, 24 articles were identified. Overall frequency of acceptable technical quality of root fillings was 48%. From this total, 52% related to anterior teeth, 49% to premolars and 26% to molars. The main procedural errors reported were ledge formation, furcation perforation, apical transportation and apical perforation. The heterogeneity amongst the studies was high (84-99%). Five studies had a high risk of bias, eight had a moderate risk, and 11 had low risk. The overall quality of evidence identified was very low. The conclusion was that technical quality of root fillings performed by undergraduate students is low, which may reveal that endodontic education has limited achievement at undergraduate level. A plan to improve the quality of root fillings, and by extrapolation the overall quality of root canal treatment, should be discussed by the staff responsible for endodontic education and training. © 2017 International Endodontic Journal. Published by John Wiley & Sons Ltd.

  4. Artificial intelligence for the CTA Observatory scheduler

    NASA Astrophysics Data System (ADS)

    Colomé, Josep; Colomer, Pau; Campreciós, Jordi; Coiffard, Thierry; de Oña, Emma; Pedaletti, Giovanna; Torres, Diego F.; Garcia-Piquer, Alvaro

    2014-08-01

    Propagation techniques. A simulation platform, an analysis tool and different test case scenarios for CTA were developed to test the performance of the scheduler and are also described.

  5. Vehicle yaw stability control via H∞ gain scheduling

    NASA Astrophysics Data System (ADS)

    Zhang, Jinhua; Sun, Weichao; Feng, Zhiguang

    2018-06-01

    Yaw stability control (YSC) is rather significant in a vehicle lateral motion, since it can considerably reduce casualties caused by vehicle instability. Nevertheless with the vehicle running, the parameters, such as vehicle mass and moment of inertial, can be perturbed because of variation of capacity, loadage and consumption of fuel, hence some of nominal controllers cannot always work satisfactorily. To overcome the aforementioned deficiency, a gain scheduled H∞ YSC controller is developed in this paper, taking the vehicle mass and moment of inertial as the scheduled variables, now that the gain scheduled H∞ controller can guarantee both the robustness against parameter perturbation and the adjustability of tracking accuracy. Then the constructed controller is verified via numerical simulation and MATLAB-CarSim coalition simulation. The simulation results indicate that the designed controller can indeed improve the vehicle handing performance under circumstance of lateral stability.

  6. Evaluation of the Terminal Area Precision Scheduling and Spacing System for Performance-Based Navigation Arrivals

    NASA Technical Reports Server (NTRS)

    Jung, Jaewoo; Swenson, Harry; Thipphavong, Jane; Martin, Lynne Hazel; Chen, Liang; Nguyen, Jimmy

    2013-01-01

    The growth of global demand for air transportation has put increasing strain on the nation's air traffic management system. To relieve this strain, the International Civil Aviation Organization has urged all nations to adopt Performance-Based Navigation (PBN), which can help to reduce air traffic congestion, decrease aviation fuel consumption, and protect the environment. NASA has developed a Terminal Area Precision Scheduling and Spacing (TAPSS) system that can support increased use of PBN during periods of high traffic, while supporting fuel-efficient, continuous descent approaches. In the original development of this system, arrival aircraft are assigned fuel-efficient Area Navigation (RNAV) Standard Terminal Arrival Routes before their initial descent from cruise, with routing defined to a specific runway. The system also determines precise schedules for these aircraft that facilitate continuous descent through the assigned routes. To meet these schedules, controllers are given a set of advisory tools to precisely control aircraft. The TAPSS system has been evaluated in a series of human-in-the-loop (HITL) air traffic simulations during 2010 and 2011. Results indicated increased airport arrival throughput up to 10 over current operations, and maintained fuel-efficient aircraft decent profiles from the initial descent to landing with reduced controller workload. This paper focuses on results from a joint NASA and FAA HITL simulation conducted in 2012. Due to the FAA rollout of the advance terminal area PBN procedures at mid-sized airports first, the TAPSS system was modified to manage arrival aircraft as they entered Terminal Radar Approach Control (TRACON). Dallas-Love Field airport (DAL) was selected by the FAA as a representative mid-sized airport within a constrained TRACON airspace due to the close proximity of a major airport, in this case Dallas-Ft Worth International Airport, one of the busiest in the world. To address this constraint, RNAV routes and

  7. 1993 Wholesale Power and Transmission Rate Schedules.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    US Bonneville Power Administration

    1993-10-01

    Bonneville Power Administration 1993 Wholesale Power Rate Schedules and General Rate Schedule Provisions and 1993 Transmission Rate Schedules and General Transmission Rate Schedule Provisions, contained herein, were approved on an interim basis effective October 1, 1993. These rate schedules and provisions were approved by the Federal Energy Commission, United States Department of Energy, in September, 1993. These rate schedules and provisions supersede the Administration`s Wholesale Power Rate Schedules and General Rate Schedule Provisions and Transmission Rate Schedules and General Transmission Rate Schedule Provisions effective October 1, 1991.

  8. Stochastic online appointment scheduling of multi-step sequential procedures in nuclear medicine.

    PubMed

    Pérez, Eduardo; Ntaimo, Lewis; Malavé, César O; Bailey, Carla; McCormack, Peter

    2013-12-01

    The increased demand for medical diagnosis procedures has been recognized as one of the contributors to the rise of health care costs in the U.S. in the last few years. Nuclear medicine is a subspecialty of radiology that uses advanced technology and radiopharmaceuticals for the diagnosis and treatment of medical conditions. Procedures in nuclear medicine require the use of radiopharmaceuticals, are multi-step, and have to be performed under strict time window constraints. These characteristics make the scheduling of patients and resources in nuclear medicine challenging. In this work, we derive a stochastic online scheduling algorithm for patient and resource scheduling in nuclear medicine departments which take into account the time constraints imposed by the decay of the radiopharmaceuticals and the stochastic nature of the system when scheduling patients. We report on a computational study of the new methodology applied to a real clinic. We use both patient and clinic performance measures in our study. The results show that the new method schedules about 600 more patients per year on average than a scheduling policy that was used in practice by improving the way limited resources are managed at the clinic. The new methodology finds the best start time and resources to be used for each appointment. Furthermore, the new method decreases patient waiting time for an appointment by about two days on average.

  9. 78 FR 48995 - Medicare Program; Revisions to Payment Policies Under the Physician Fee Schedule, DME Face-to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-12

    ...This document corrects technical errors that appeared in the final rule with comment period published in the Federal Register on November 16, 2012, entitled ``Medicare Program; Revisions to Payment Policies Under the Physician Fee Schedule, DME Face-to-Face Encounters, Elimination of the Requirement for Termination of Non-Random Prepayment Complex Medical Review and Other Revisions to Part B for CY 2013.''

  10. Forensic Schedule Analysis of Construction Delay in Military Projects in the Middle East

    DTIC Science & Technology

    This research performs forensic schedule analysis of delay factors that impacted recent large-scale military construction projects in the Middle East...The methodologies for analysis are adapted from the Professional Practice Guide to Forensic Schedule Analysis, particularly Method 3.7 Modeled

  11. Geometric Distribution-Based Readers Scheduling Optimization Algorithm Using Artificial Immune System.

    PubMed

    Duan, Litian; Wang, Zizhong John; Duan, Fu

    2016-11-16

    In the multiple-reader environment (MRE) of radio frequency identification (RFID) system, multiple readers are often scheduled to interrogate the randomized tags via operating at different time slots or frequency channels to decrease the signal interferences. Based on this, a Geometric Distribution-based Multiple-reader Scheduling Optimization Algorithm using Artificial Immune System (GD-MRSOA-AIS) is proposed to fairly and optimally schedule the readers operating from the viewpoint of resource allocations. GD-MRSOA-AIS is composed of two parts, where a geometric distribution function combined with the fairness consideration is first introduced to generate the feasible scheduling schemes for reader operation. After that, artificial immune system (including immune clone, immune mutation and immune suppression) quickly optimize these feasible ones as the optimal scheduling scheme to ensure that readers are fairly operating with larger effective interrogation range and lower interferences. Compared with the state-of-the-art algorithm, the simulation results indicate that GD-MRSOA-AIS could efficiently schedules the multiple readers operating with a fairer resource allocation scheme, performing in larger effective interrogation range.

  12. Geometric Distribution-Based Readers Scheduling Optimization Algorithm Using Artificial Immune System

    PubMed Central

    Duan, Litian; Wang, Zizhong John; Duan, Fu

    2016-01-01

    In the multiple-reader environment (MRE) of radio frequency identification (RFID) system, multiple readers are often scheduled to interrogate the randomized tags via operating at different time slots or frequency channels to decrease the signal interferences. Based on this, a Geometric Distribution-based Multiple-reader Scheduling Optimization Algorithm using Artificial Immune System (GD-MRSOA-AIS) is proposed to fairly and optimally schedule the readers operating from the viewpoint of resource allocations. GD-MRSOA-AIS is composed of two parts, where a geometric distribution function combined with the fairness consideration is first introduced to generate the feasible scheduling schemes for reader operation. After that, artificial immune system (including immune clone, immune mutation and immune suppression) quickly optimize these feasible ones as the optimal scheduling scheme to ensure that readers are fairly operating with larger effective interrogation range and lower interferences. Compared with the state-of-the-art algorithm, the simulation results indicate that GD-MRSOA-AIS could efficiently schedules the multiple readers operating with a fairer resource allocation scheme, performing in larger effective interrogation range. PMID:27854342

  13. Optimizing donor scheduling before recruitment: An effective approach to increasing apheresis platelet collections.

    PubMed

    Lokhandwala, Parvez M; Shike, Hiroko; Wang, Ming; Domen, Ronald E; George, Melissa R

    2018-01-01

    Typical approach for increasing apheresis platelet collections is to recruit new donors. Here, we investigated the effectiveness of an alternative strategy: optimizing donor scheduling, prior to recruitment, at a hospital-based blood donor center. Analysis of collections, during the 89 consecutive months since opening of donor center, was performed. Linear regression and segmented time-series analyses were performed to calculate growth rates of collections and to test for statistical differences, respectively. Pre-intervention donor scheduling capacity was 39/month. In the absence of active donor recruitment, during the first 29 months, the number of collections rose gradually to 24/month (growth-rate of 0.70/month). However, between month-30 and -55, collections exhibited a plateau at 25.6 ± 3.0 (growth-rate of -0.09/month) (p<0.0001). This plateau-phase coincided with donor schedule approaching saturation (65.6 ± 7.6% schedule booked). Scheduling capacity was increased by following two interventions: adding an apheresis instrument (month-56) and adding two more collection days/week (month-72). Consequently, the scheduling capacity increased to 130/month. Post-interventions, apheresis platelet collections between month-56 and -81 exhibited a spontaneous renewed growth at a rate of 0.62/month (p<0.0001), in absence of active donor recruitment. Active donor recruitment in month-82 and -86, when the donor schedule had been optimized to accommodate further growth, resulted in a dramatic but transient surge in collections. Apheresis platelet collections plateau at nearly 2/3rd of the scheduling capacity. Optimizing the scheduling capacity prior to active donor recruitment is an effective strategy to increase platelet collections at a hospital-based donor center.

  14. Experiments with a Parallel Multi-Objective Evolutionary Algorithm for Scheduling

    NASA Technical Reports Server (NTRS)

    Brown, Matthew; Johnston, Mark D.

    2013-01-01

    Evolutionary multi-objective algorithms have great potential for scheduling in those situations where tradeoffs among competing objectives represent a key requirement. One challenge, however, is runtime performance, as a consequence of evolving not just a single schedule, but an entire population, while attempting to sample the Pareto frontier as accurately and uniformly as possible. The growing availability of multi-core processors in end user workstations, and even laptops, has raised the question of the extent to which such hardware can be used to speed up evolutionary algorithms. In this paper we report on early experiments in parallelizing a Generalized Differential Evolution (GDE) algorithm for scheduling long-range activities on NASA's Deep Space Network. Initial results show that significant speedups can be achieved, but that performance does not necessarily improve as more cores are utilized. We describe our preliminary results and some initial suggestions from parallelizing the GDE algorithm. Directions for future work are outlined.

  15. Balancing antagonistic time and resource utilization constraints in over-subscribed scheduling problems

    NASA Technical Reports Server (NTRS)

    Smith, Stephen F.; Pathak, Dhiraj K.

    1991-01-01

    In this paper, we report work aimed at applying concepts of constraint-based problem structuring and multi-perspective scheduling to an over-subscribed scheduling problem. Previous research has demonstrated the utility of these concepts as a means for effectively balancing conflicting objectives in constraint-relaxable scheduling problems, and our goal here is to provide evidence of their similar potential in the context of HST observation scheduling. To this end, we define and experimentally assess the performance of two time-bounded heuristic scheduling strategies in balancing the tradeoff between resource setup time minimization and satisfaction of absolute time constraints. The first strategy considered is motivated by dispatch-based manufacturing scheduling research, and employs a problem decomposition that concentrates local search on minimizing resource idle time due to setup activities. The second is motivated by research in opportunistic scheduling and advocates a problem decomposition that focuses attention on the goal activities that have the tightest temporal constraints. Analysis of experimental results gives evidence of differential superiority on the part of each strategy in different problem solving circumstances. A composite strategy based on recognition of characteristics of the current problem solving state is then defined and tested to illustrate the potential benefits of constraint-based problem structuring and multi-perspective scheduling in over-subscribe scheduling problems.

  16. Work schedule manager gap analysis : assessing the future training needs of work schedule managers using a strategic job analysis approach.

    DOT National Transportation Integrated Search

    2010-05-01

    This report documents the results of a strategic job analysis that examined the job tasks and knowledge, skills, abilities, and other characteristics (KSAOs) needed to perform the job of a work schedule manager. The strategic job analysis compared in...

  17. Work schedule manager gap analysis : assessing the future training needs of work schedule managers using a strategic job analysis approach

    DOT National Transportation Integrated Search

    2010-05-01

    This report documents the results of a strategic job analysis that examined the job tasks and knowledge, skills, abilities, and other characteristics (KSAOs) needed to perform the job of a work schedule manager. The strategic job analysis compared in...

  18. 7 CFR 1469.9 - Technical assistance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Technical assistance. 1469.9 Section 1469.9... Provisions § 1469.9 Technical assistance. (a) NRCS may use the services of NRCS-approved or certified Technical Service Providers in performing its responsibilities for technical assistance. (b) Technical...

  19. Development and Validation of the Appearance and Performance Enhancing Drug Use Schedule

    PubMed Central

    Langenbucher, James W.; Lai, Justine Karmin; Loeb, Katharine L.; Hollander, Eric

    2011-01-01

    Appearance-and-performance enhancing drug (APED) use is a form of drug use that includes use of a wide range of substances such as anabolic-androgenic steroids (AASs) and associated behaviors including intense exercise and dietary control. To date, there are no reliable or valid measures of the core features of APED use. The present study describes the development and psychometric evaluation of the Appearance and Performance Enhancing Drug Use Schedule (APEDUS) which is a semi-structured interview designed to assess the spectrum of drug use and related features of APED use. Eighty-five current APED using men and women (having used an illicit APED in the past year and planning to use an illicit APED in the future) completed the APEDUS and measures of convergent and divergent validity. Inter-rater agreement, scale reliability, one-week test-retest reliability, convergent and divergent validity, and construct validity were evaluated for each of the APEDUS scales. The APEDUS is a modular interview with 10 sections designed to assess the core drug and non-drug phenomena associated with APED use. All scales and individual items demonstrated high inter-rater agreement and reliability. Individual scales significantly correlated with convergent measures (DSM-IV diagnoses, aggression, impulsivity, eating disorder pathology) and were uncorrelated with a measure of social desirability. APEDUS subscale scores were also accurate measures of AAS dependence. The APEDUS is a reliable and valid measure of APED phenomena and an accurate measure of the core pathology associated with APED use. Issues with assessing APED use are considered and future research considered. PMID:21640487

  20. Complex ambulatory settings demand scheduling systems.

    PubMed

    Ross, K M

    1998-01-01

    Practice management systems are becoming more and more complex, as they are asked to integrate all aspects of patient and resource management. Although patient scheduling is a standard expectation in any ambulatory environment, facilities and equipment resource scheduling are additional functionalities of scheduling systems. Because these functions were not typically managed in manual patient scheduling, often the result was resource mismanagement, along with a potential negative impact on utilization, patient flow and provider productivity. As ambulatory organizations have become more seasoned users of practice management software, the value of resource scheduling has become apparent. Appointment scheduling within a fully integrated practice management system is recognized as an enhancement of scheduling itself and provides additional tools to manage other information needs. Scheduling, as one component of patient information management, provides additional tools in these areas.

  1. The impact of a scheduling change on ninth grade high school performance on biology benchmark exams and the California Standards Test

    NASA Astrophysics Data System (ADS)

    Leonardi, Marcelo

    The primary purpose of this study was to examine the impact of a scheduling change from a trimester 4x4 block schedule to a modified hybrid schedule on student achievement in ninth grade biology courses. This study examined the impact of the scheduling change on student achievement through teacher created benchmark assessments in Genetics, DNA, and Evolution and on the California Standardized Test in Biology. The secondary purpose of this study examined the ninth grade biology teacher perceptions of ninth grade biology student achievement. Using a mixed methods research approach, data was collected both quantitatively and qualitatively as aligned to research questions. Quantitative methods included gathering data from departmental benchmark exams and California Standardized Test in Biology and conducting multiple analysis of covariance and analysis of covariance to determine significance differences. Qualitative methods include journal entries questions and focus group interviews. The results revealed a statistically significant increase in scores on both the DNA and Evolution benchmark exams. DNA and Evolution benchmark exams showed significant improvements from a change in scheduling format. The scheduling change was responsible for 1.5% of the increase in DNA benchmark scores and 2% of the increase in Evolution benchmark scores. The results revealed a statistically significant decrease in scores on the Genetics Benchmark exam as a result of the scheduling change. The scheduling change was responsible for 1% of the decrease in Genetics benchmark scores. The results also revealed a statistically significant increase in scores on the CST Biology exam. The scheduling change was responsible for .7% of the increase in CST Biology scores. Results of the focus group discussions indicated that all teachers preferred the modified hybrid schedule over the trimester schedule and that it improved student achievement.

  2. Knowledge-Based Scheduling of Arrival Aircraft in the Terminal Area

    NASA Technical Reports Server (NTRS)

    Krzeczowski, K. J.; Davis, T.; Erzberger, H.; Lev-Ram, Israel; Bergh, Christopher P.

    1995-01-01

    A knowledge based method for scheduling arrival aircraft in the terminal area has been implemented and tested in real time simulation. The scheduling system automatically sequences, assigns landing times, and assign runways to arrival aircraft by utilizing continuous updates of aircraft radar data and controller inputs. The scheduling algorithm is driven by a knowledge base which was obtained in over two thousand hours of controller-in-the-loop real time simulation. The knowledge base contains a series of hierarchical 'rules' and decision logic that examines both performance criteria, such as delay reductions, as well as workload reduction criteria, such as conflict avoidance. The objective of the algorithm is to devise an efficient plan to land the aircraft in a manner acceptable to the air traffic controllers. This paper describes the scheduling algorithms, gives examples of their use, and presents data regarding their potential benefits to the air traffic system.

  3. It Is Not Just about the Schedule: Key Factors in Effective Reference Desk Scheduling and Management

    ERIC Educational Resources Information Center

    Sciammarella, Susan; Fernandes, Maria Isabel; McKay, Devin

    2008-01-01

    Reference desk scheduling is one of the most challenging tasks in the organizational structure of an academic library. The ability to turn this challenge into a workable and effective function lies with the scheduler and indirectly the cooperation of all librarians scheduled for reference desk service. It is the scheduler's sensitivity to such…

  4. Generation of Look-Up Tables for Dynamic Job Shop Scheduling Decision Support Tool

    NASA Astrophysics Data System (ADS)

    Oktaviandri, Muchamad; Hassan, Adnan; Mohd Shaharoun, Awaluddin

    2016-02-01

    Majority of existing scheduling techniques are based on static demand and deterministic processing time, while most job shop scheduling problem are concerned with dynamic demand and stochastic processing time. As a consequence, the solutions obtained from the traditional scheduling technique are ineffective wherever changes occur to the system. Therefore, this research intends to develop a decision support tool (DST) based on promising artificial intelligent that is able to accommodate the dynamics that regularly occur in job shop scheduling problem. The DST was designed through three phases, i.e. (i) the look-up table generation, (ii) inverse model development and (iii) integration of DST components. This paper reports the generation of look-up tables for various scenarios as a part in development of the DST. A discrete event simulation model was used to compare the performance among SPT, EDD, FCFS, S/OPN and Slack rules; the best performances measures (mean flow time, mean tardiness and mean lateness) and the job order requirement (inter-arrival time, due dates tightness and setup time ratio) which were compiled into look-up tables. The well-known 6/6/J/Cmax Problem from Muth and Thompson (1963) was used as a case study. In the future, the performance measure of various scheduling scenarios and the job order requirement will be mapped using ANN inverse model.

  5. Operating room scheduling using hybrid clustering priority rule and genetic algorithm

    NASA Astrophysics Data System (ADS)

    Santoso, Linda Wahyuni; Sinawan, Aisyah Ashrinawati; Wijaya, Andi Rahadiyan; Sudiarso, Andi; Masruroh, Nur Aini; Herliansyah, Muhammad Kusumawan

    2017-11-01

    Operating room is a bottleneck resource in most hospitals so that operating room scheduling system will influence the whole performance of the hospitals. This research develops a mathematical model of operating room scheduling for elective patients which considers patient priority with limit number of surgeons, operating rooms, and nurse team. Clustering analysis was conducted to the data of surgery durations using hierarchical and non-hierarchical methods. The priority rule of each resulting cluster was determined using Shortest Processing Time method. Genetic Algorithm was used to generate daily operating room schedule which resulted in the lowest values of patient waiting time and nurse overtime. The computational results show that this proposed model reduced patient waiting time by approximately 32.22% and nurse overtime by approximately 32.74% when compared to actual schedule.

  6. Vectorization of a penalty function algorithm for well scheduling

    NASA Technical Reports Server (NTRS)

    Absar, I.

    1984-01-01

    In petroleum engineering, the oil production profiles of a reservoir can be simulated by using a finite gridded model. This profile is affected by the number and choice of wells which in turn is a result of various production limits and constraints including, for example, the economic minimum well spacing, the number of drilling rigs available and the time required to drill and complete a well. After a well is available it may be shut in because of excessive water or gas productions. In order to optimize the field performance a penalty function algorithm was developed for scheduling wells. For an example with some 343 wells and 15 different constraints, the scheduling routine vectorized for the CYBER 205 averaged 560 times faster performance than the scalar version.

  7. Replacing fossil based plastic performance products by bio-based plastic products-Technical feasibility.

    PubMed

    van den Oever, Martien; Molenveld, Karin

    2017-07-25

    Larger scale market introduction of new bio-based products requires a clear advantage regarding sustainability, as well as an adequate techno-economic positioning relative to fossil based products. In a previous paper [Broeren et al., 2016], LCA results per kg and per functionality equivalent of bio-based plastics were presented, together with economic considerations. The present paper discusses the mechanical and thermal properties of a range of commercially available bio-based plastics based on polylactic acid (PLA), cellulose esters, starch and polyamides, and the feasibility of replacing fossil-based counterparts based on performance. The evaluation is approached from an end user perspective. First, potentially suitable bio-based plastics are selected based on manufacturers' specifications in technical data sheets, then a first experimental evaluation is performed on injection moulded ISO specimens, and finally a further selection of plastics is tested on large 50×70cm panels. This technical feasibility study indicates that so far bio-based plastics do not completely match the properties of high performance materials like flame retardant V-0 PC/ABS blends used in electronic devices. The performance gap is being decreased by the development of stereocomplex PLA and hybrid PLA blends with polycarbonate, which offer clearly improved properties with respect to maximum usage temperature and toughness. In addition, several materials meet the V-0 flammability requirements needed in specific durable applications. On the other hand, improving these properties so far has negative consequences for the bio-based content. This study also shows that replacement of bulk polymers like PS is feasible using PLA compounds with a bio-based content as high as 85%. Copyright © 2016 Elsevier B.V. All rights reserved.

  8. DTS: Building custom, intelligent schedulers

    NASA Technical Reports Server (NTRS)

    Hansson, Othar; Mayer, Andrew

    1994-01-01

    DTS is a decision-theoretic scheduler, built on top of a flexible toolkit -- this paper focuses on how the toolkit might be reused in future NASA mission schedulers. The toolkit includes a user-customizable scheduling interface, and a 'Just-For-You' optimization engine. The customizable interface is built on two metaphors: objects and dynamic graphs. Objects help to structure problem specifications and related data, while dynamic graphs simplify the specification of graphical schedule editors (such as Gantt charts). The interface can be used with any 'back-end' scheduler, through dynamically-loaded code, interprocess communication, or a shared database. The 'Just-For-You' optimization engine includes user-specific utility functions, automatically compiled heuristic evaluations, and a postprocessing facility for enforcing scheduling policies. The optimization engine is based on BPS, the Bayesian Problem-Solver (1,2), which introduced a similar approach to solving single-agent and adversarial graph search problems.

  9. 49 CFR Schedule C to Subpart B of... - Schedule C to Subpart B of Part 1139

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 8 2014-10-01 2014-10-01 false Schedule C to Subpart B of Part 1139 C Schedule C... REVENUE PROCEEDINGS Intercity Bus Industry Pt. 1139, Subpt. B, Sch. C Schedule C to Subpart B of Part 1139 Attachment 1 Schedule C Part I—Condensed Income Statement [Dollars in thousands] () Greyhound Lines, Inc...

  10. 49 CFR Schedule C to Subpart B of... - Schedule C to Subpart B of Part 1139

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 8 2011-10-01 2011-10-01 false Schedule C to Subpart B of Part 1139 C Schedule C... REVENUE PROCEEDINGS Intercity Bus Industry Pt. 1139, Subpt. B, Sch. C Schedule C to Subpart B of Part 1139 Attachment 1 Schedule C Part I—Condensed Income Statement [Dollars in thousands] () Greyhound Lines, Inc...

  11. 49 CFR Schedule C to Subpart B of... - Schedule C to Subpart B of Part 1139

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 8 2010-10-01 2010-10-01 false Schedule C to Subpart B of Part 1139 C Schedule C... REVENUE PROCEEDINGS Intercity Bus Industry Pt. 1139, Subpt. B, Sch. C Schedule C to Subpart B of Part 1139 Attachment 1 Schedule C Part I—Condensed Income Statement [Dollars in thousands] () Greyhound Lines, Inc...

  12. 46 CFR 525.2 - Terminal schedules.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... scrap, new assembled motor vehicles, waste paper and paper waste in terminal schedules. (2) Marine... MARITIME COMMISSION REGULATIONS AFFECTING OCEAN SHIPPING IN FOREIGN COMMERCE MARINE TERMINAL OPERATOR SCHEDULES § 525.2 Terminal schedules. (a) Marine terminal operator schedules. A marine terminal operator, at...

  13. 46 CFR 525.2 - Terminal schedules.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... scrap, new assembled motor vehicles, waste paper and paper waste in terminal schedules. (2) Marine... MARITIME COMMISSION REGULATIONS AFFECTING OCEAN SHIPPING IN FOREIGN COMMERCE MARINE TERMINAL OPERATOR SCHEDULES § 525.2 Terminal schedules. (a) Marine terminal operator schedules. A marine terminal operator, at...

  14. 29 CFR 825.203 - Scheduling of intermittent or reduced schedule leave.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OF LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Employee Leave Entitlements Under the Family and Medical Leave Act § 825.203 Scheduling of intermittent or reduced schedule leave. Eligible... the serious health condition of a covered family member or the employee or the serious injury or...

  15. Reactive Scheduling in Multipurpose Batch Plants

    NASA Astrophysics Data System (ADS)

    Narayani, A.; Shaik, Munawar A.

    2010-10-01

    Scheduling is an important operation in process industries for improving resource utilization resulting in direct economic benefits. It has a two-fold objective of fulfilling customer orders within the specified time as well as maximizing the plant profit. Unexpected disturbances such as machine breakdown, arrival of rush orders and cancellation of orders affect the schedule of the plant. Reactive scheduling is generation of a new schedule which has minimum deviation from the original schedule in spite of the occurrence of unexpected events in the plant operation. Recently, Shaik & Floudas (2009) proposed a novel unified model for short-term scheduling of multipurpose batch plants using unit-specific event-based continuous time representation. In this paper, we extend the model of Shaik & Floudas (2009) to handle reactive scheduling.

  16. A bicriteria heuristic for an elective surgery scheduling problem.

    PubMed

    Marques, Inês; Captivo, M Eugénia; Vaz Pato, Margarida

    2015-09-01

    Resource rationalization and reduction of waiting lists for surgery are two main guidelines for hospital units outlined in the Portuguese National Health Plan. This work is dedicated to an elective surgery scheduling problem arising in a Lisbon public hospital. In order to increase the surgical suite's efficiency and to reduce the waiting lists for surgery, two objectives are considered: maximize surgical suite occupation and maximize the number of surgeries scheduled. This elective surgery scheduling problem consists of assigning an intervention date, an operating room and a starting time for elective surgeries selected from the hospital waiting list. Accordingly, a bicriteria surgery scheduling problem arising in the hospital under study is presented. To search for efficient solutions of the bicriteria optimization problem, the minimization of a weighted Chebyshev distance to a reference point is used. A constructive and improvement heuristic procedure specially designed to address the objectives of the problem is developed and results of computational experiments obtained with empirical data from the hospital are presented. This study shows that by using the bicriteria approach presented here it is possible to build surgical plans with very good performance levels. This method can be used within an interactive approach with the decision maker. It can also be easily adapted to other hospitals with similar scheduling conditions.

  17. Optimized Hypervisor Scheduler for Parallel Discrete Event Simulations on Virtual Machine Platforms

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yoginath, Srikanth B; Perumalla, Kalyan S

    2013-01-01

    With the advent of virtual machine (VM)-based platforms for parallel computing, it is now possible to execute parallel discrete event simulations (PDES) over multiple virtual machines, in contrast to executing in native mode directly over hardware as is traditionally done over the past decades. While mature VM-based parallel systems now offer new, compelling benefits such as serviceability, dynamic reconfigurability and overall cost effectiveness, the runtime performance of parallel applications can be significantly affected. In particular, most VM-based platforms are optimized for general workloads, but PDES execution exhibits unique dynamics significantly different from other workloads. Here we first present results frommore » experiments that highlight the gross deterioration of the runtime performance of VM-based PDES simulations when executed using traditional VM schedulers, quantitatively showing the bad scaling properties of the scheduler as the number of VMs is increased. The mismatch is fundamental in nature in the sense that any fairness-based VM scheduler implementation would exhibit this mismatch with PDES runs. We also present a new scheduler optimized specifically for PDES applications, and describe its design and implementation. Experimental results obtained from running PDES benchmarks (PHOLD and vehicular traffic simulations) over VMs show over an order of magnitude improvement in the run time of the PDES-optimized scheduler relative to the regular VM scheduler, with over 20 reduction in run time of simulations using up to 64 VMs. The observations and results are timely in the context of emerging systems such as cloud platforms and VM-based high performance computing installations, highlighting to the community the need for PDES-specific support, and the feasibility of significantly reducing the runtime overhead for scalable PDES on VM platforms.« less

  18. A hybrid dynamic harmony search algorithm for identical parallel machines scheduling

    NASA Astrophysics Data System (ADS)

    Chen, Jing; Pan, Quan-Ke; Wang, Ling; Li, Jun-Qing

    2012-02-01

    In this article, a dynamic harmony search (DHS) algorithm is proposed for the identical parallel machines scheduling problem with the objective to minimize makespan. First, an encoding scheme based on a list scheduling rule is developed to convert the continuous harmony vectors to discrete job assignments. Second, the whole harmony memory (HM) is divided into multiple small-sized sub-HMs, and each sub-HM performs evolution independently and exchanges information with others periodically by using a regrouping schedule. Third, a novel improvisation process is applied to generate a new harmony by making use of the information of harmony vectors in each sub-HM. Moreover, a local search strategy is presented and incorporated into the DHS algorithm to find promising solutions. Simulation results show that the hybrid DHS (DHS_LS) is very competitive in comparison to its competitors in terms of mean performance and average computational time.

  19. Cross-Layer Adaptive Feedback Scheduling of Wireless Control Systems

    PubMed Central

    Xia, Feng; Ma, Longhua; Peng, Chen; Sun, Youxian; Dong, Jinxiang

    2008-01-01

    There is a trend towards using wireless technologies in networked control systems. However, the adverse properties of the radio channels make it difficult to design and implement control systems in wireless environments. To attack the uncertainty in available communication resources in wireless control systems closed over WLAN, a cross-layer adaptive feedback scheduling (CLAFS) scheme is developed, which takes advantage of the co-design of control and wireless communications. By exploiting cross-layer design, CLAFS adjusts the sampling periods of control systems at the application layer based on information about deadline miss ratio and transmission rate from the physical layer. Within the framework of feedback scheduling, the control performance is maximized through controlling the deadline miss ratio. Key design parameters of the feedback scheduler are adapted to dynamic changes in the channel condition. An event-driven invocation mechanism for the feedback scheduler is also developed. Simulation results show that the proposed approach is efficient in dealing with channel capacity variations and noise interference, thus providing an enabling technology for control over WLAN. PMID:27879934

  20. Scheduled Peripheral Component Interconnect Arbiter

    NASA Technical Reports Server (NTRS)

    Nixon, Scott Alan (Inventor)

    2015-01-01

    Systems and methods are described for arbitrating access of a communication bus. In one embodiment, a method includes performing steps on one or more processors. The steps include: receiving an access request from a device of the communication bus; evaluating a bus schedule to determine an importance of the device based on the access request; and selectively granting access of the communication bus to the device based on the importance of the device.