Sample records for technical planning activity

  1. Engineering Technical Review Planning Briefing

    NASA Technical Reports Server (NTRS)

    Gardner, Terrie

    2012-01-01

    The general topics covered in the engineering technical planning briefing are 1) overviews of NASA, Marshall Space Flight Center (MSFC), and Engineering, 2) the NASA Systems Engineering(SE) Engine and its implementation , 3) the NASA Project Life Cycle, 4) MSFC Technical Management Branch Services in relation to the SE Engine and the Project Life Cycle , 5) Technical Reviews, 6) NASA Human Factor Design Guidance , and 7) the MSFC Human Factors Team. The engineering technical review portion of the presentation is the primary focus of the overall presentation and will address the definition of a design review, execution guidance, the essential stages of a technical review, and the overall review planning life cycle. Examples of a technical review plan content, review approaches, review schedules, and the review process will be provided and discussed. The human factors portion of the presentation will focus on the NASA guidance for human factors. Human factors definition, categories, design guidance, and human factor specialist roles will be addressed. In addition, the NASA Systems Engineering Engine description, definition, and application will be reviewed as background leading into the NASA Project Life Cycle Overview and technical review planning discussion.

  2. SERC 2014 2018 Technical Plan: 2016 Update

    DTIC Science & Technology

    2016-02-18

    Contract Number: HQ0034-13-D-0004 February 18, 2016 SERC 2014-2018 Technical Plan Update SERC 2014-2018 Technical Plan: 2016 Update...UNCLASSIFIED / APPROVED FOR PUBLIC RELEASE Contract Number: HQ0034-13-D-0004 February 18, 2016 SERC 2014-2018 Technical Plan Update ii...18, 2016 SERC 2014-2018 Technical Plan Update iii TABLE OF CONTENTS Table of Contents

  3. Technical Assistance Plan (TAP)

    EPA Pesticide Factsheets

    A Technical Assistance Plan (TAP) enables community groups to retain the services of an independent technical advisor and to provide resources for a community group to help inform other community members about site decisions.

  4. INDOT Technical Training Plan

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations : for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and E...

  5. Maintaining technical excellence requires a national plan

    NASA Technical Reports Server (NTRS)

    Davidson, T. F.

    1991-01-01

    To meet the challenge of technical excellence, AIA established a rocket propulsion committee to develop the National Rocket Propulsion Strategic Plan. Developing such a plan required a broad spectrum of experience and disciplines. The Strategic Plan team needed the participation of industry, government, and academia. The plan provides, if followed, a means for the U.S. to maintain technical excellence and world leadership in rocket propulsion. To implement the National Rocket Propulsion Strategic Plan is to invest in the social, economic, and technological futures of America. The plan lays the basis for upgrading existing propulsion systems and a firm base for future full scale development, production, and operation of rocket propulsion systems for space, defense, and commercial applications.

  6. INDOT Technical Training Plan : Appendix B

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  7. INDOT Technical Training Plan : Appendix M

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  8. INDOT Technical Training Plan : Appendix P

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  9. INDOT Technical Training Plan : Appendix F

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  10. INDOT Technical Training Plan : Appendix H

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  11. INDOT Technical Training Plan : Appendix E

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  12. INDOT Technical Training Plan : Appendix O

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  13. INDOT Technical Training Plan : Appendix J

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  14. INDOT Technical Training Plan : Appendix L

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  15. INDOT Technical Training Plan : Appendix A

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  16. INDOT Technical Training Plan : Appendix D

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  17. INDOT Technical Training Plan : Appendix K

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  18. INDOT Technical Training Plan : Appendix G

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  19. INDOT Technical Training Plan : Appendix I

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  20. INDOT Technical Training Plan : Appendix N

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  1. INDOT Technical Training Plan : Appendix C

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  2. A Guide to Systematic Planning for Vocational and Technical Schools. Research 22.

    ERIC Educational Resources Information Center

    Meckley, Richard F.; And Others

    A school planning scheme involving 46 principle activities which occur over a 38-month period is presented. This scheme was developed for individuals responsible for the planning of vocational and technical schools, i.e., supervisors, state staff, university school plant planners, architects, and local school administrators. The activities…

  3. The Technical Work Plan Tracking Tool

    NASA Technical Reports Server (NTRS)

    Chullen, Cinda; Leighton, Adele; Weller, Richard A.; Woodfill, Jared; Parkman, William E.; Ellis, Glenn L.; Wilson, Marilyn M.

    2003-01-01

    The Technical Work Plan Tracking Tool is a web-based application that enables interactive communication and approval of contract requirements that pertain to the administration of the Science, Engineering, Analysis, and Test (SEAT) contract at Johnson Space Center. The implementation of the application has (1) shortened the Technical Work Plan approval process, (2) facilitated writing and documenting requirements in a performance-based environment with associated surveillance plans, (3) simplified the contractor s estimate of the cost for the required work, and (4) allowed for the contractor to document how they plan to accomplish the work. The application is accessible to over 300 designated NASA and contractor employees via two Web sites. For each employee, the application regulates access according to the employee s authority to enter, view, and/or print out diverse information, including reports, work plans, purchase orders, and financial data. Advanced features of this application include on-line approval capability, automatic e-mail notifications requesting review by subsequent approvers, and security inside and outside the firewall.

  4. Succession planning for technical experts

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kirk, Bernadette Lugue; Cain, Ronald A.; Dewji, Shaheen A.

    This report describes a methodology for identifying, evaluating, and mitigating the loss of key technical skills at nuclear operations facilities. The methodology can be adapted for application within regulatory authorities and research and development organizations, and can be directly applied by international engagement partners of the Department of Energy’s National Nuclear Security Administration (NNSA). The resultant product will be of direct benefit to two types of NNSA missions: (1) domestic human capital development programs tasked to provide focused technical expertise to succeed an aging nuclear operations workforce, and (2) international safeguards programs charged with maintaining operational safeguards for developing/existing nuclearmore » power program in nations where minimal available resources must be used effectively. This report considers succession planning and the critical skills necessary to meet an institution’s goals and mission. Closely tied to succession planning are knowledge management and mentorship. In considering succession planning, critical skill sets are identified and are greatly dependent on the subject matter expert in question. This report also provides examples of critical skills that are job specific.« less

  5. ACT Plan: Technical Manual. 2013/2014

    ERIC Educational Resources Information Center

    ACT, Inc., 2013

    2013-01-01

    This manual contains information about the American College Test (ACT) Plan® program. The principal focus of this manual is to document the Plan program's technical adequacy in light of its intended purposes. This manual supersedes the 2011 edition. The content of this manual responds to requirements of the testing industry as established in the…

  6. Software Engineering Improvement Activities/Plan

    NASA Technical Reports Server (NTRS)

    2003-01-01

    bd Systems personnel accomplished the technical responsibilities for this reporting period, as planned. A close working relationship was maintained with personnel of the MSFC Avionics Department Software Group (ED14). Work accomplishments included development, evaluation, and enhancement of a software cost model, performing literature search and evaluation of software tools available for code analysis and requirements analysis, and participating in other relevant software engineering activities. Monthly reports were submitted. This support was provided to the Flight Software Group/ED 1 4 in accomplishing the software engineering improvement engineering activities of the Marshall Space Flight Center (MSFC) Software Engineering Improvement Plan.

  7. ATF Neutron Irradiation Program Technical Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Geringer, J. W.; Katoh, Yutai

    The Japan Atomic Energy Agency (JAEA) under the Civil Nuclear Energy Working Group (CNWG) is engaged in a cooperative research effort with the U.S. Department of Energy (DOE) to explore issues related to nuclear energy, including research on accident-tolerant fuels and materials for use in light water reactors. This work develops a draft technical plan for a neutron irradiation program on the candidate accident-tolerant fuel cladding materials and elements using the High Flux Isotope Reactor (HFIR). The research program requires the design of a detailed experiment, development of test vehicles, irradiation of test specimens, possible post-irradiation examination and characterization ofmore » irradiated materials and the shipment of irradiated materials to JAEA in Japan. This report discusses the technical plan of the experimental study.« less

  8. 48 CFR 1631.205-76 - Trade, business, technical, and professional activity costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Trade, business, technical....205-76 Trade, business, technical, and professional activity costs. (a) FEHBP participating plans, carriers, and underwriters shall seek the advance written approval of the contracting officer for...

  9. Activity Planning for the Mars Exploration Rovers

    NASA Technical Reports Server (NTRS)

    Bresina, John L.; Jonsson, Ari K.; Morris, Paul H.; Rajan, Kanna

    2004-01-01

    Operating the Mars Exploration Rovers is a challenging, time-pressured task. Each day, the operations team must generate a new plan describing the rover activities for the next day. These plans must abide by resource limitations, safety rules, and temporal constraints. The objective is to achieve as much science as possible, choosing from a set of observation requests that oversubscribe rover resources. In order to accomplish this objective, given the short amount of planning time available, the MAPGEN (Mixed-initiative Activity Plan GENerator) system was made a mission-critical part of the ground operations system. MAPGEN is a mixed-initiative system that employs automated constraint-based planning, scheduling, and temporal reasoning to assist operations staff in generating the daily activity plans. This paper describes the adaptation of constraint-based planning and temporal reasoning to a mixed-initiative setting and the key technical solutions developed for the mission deployment of MAPGEN.

  10. Planning a DSN support section technical library

    NASA Technical Reports Server (NTRS)

    Bailey, T.; Chatburn, C. C.

    1980-01-01

    The planning procedure being used to establish a technical library for the Deep Space Network support section is described. The inventory and survey methods employed are described and the preliminary results of these methods are discussed.

  11. Technical architecture of ONC-approved plans for statewide health information exchange.

    PubMed

    Barrows, Randolph C; Ezzard, John

    2011-01-01

    ONC-approved state plans for HIE were reviewed for descriptions and depictions of statewide HIE technical architecture. Review was complicated by non-standard organizational elements and technical terminology across state plans. Findings were mapped to industry standard, referenced, and defined HIE architecture descriptions and characteristics. Results are preliminary due to the initial subset of ONC-approved plans available, the rapid pace of new ONC-plan approvals, and continuing advancements in standards and technology of HIE, etc. Review of 28 state plans shows virtually all include a direct messaging component, but for participating entities at state-specific levels of granularity (RHIO, enterprise, organization/provider). About ½ of reviewed plans describe a federated architecture, and ¼ of plans utilize a single-vendor "hybrid-federated" architecture. About 1/3 of states plan to leverage new federal and open exchange technologies (DIRECT, CONNECT, etc.). Only one plan describes a centralized architecture for statewide HIE, but others combine central and federated architectural approaches.

  12. Technical Architecture of ONC-Approved Plans For Statewide Health Information Exchange

    PubMed Central

    Barrows, Randolph C.; Ezzard, John

    2011-01-01

    ONC-approved state plans for HIE were reviewed for descriptions and depictions of statewide HIE technical architecture. Review was complicated by non-standard organizational elements and technical terminology across state plans. Findings were mapped to industry standard, referenced, and defined HIE architecture descriptions and characteristics. Results are preliminary due to the initial subset of ONC-approved plans available, the rapid pace of new ONC-plan approvals, and continuing advancements in standards and technology of HIE, etc. Review of 28 state plans shows virtually all include a direct messaging component, but for participating entities at state-specific levels of granularity (RHIO, enterprise, organization/provider). About ½ of reviewed plans describe a federated architecture, and ¼ of plans utilize a single-vendor “hybrid-federated” architecture. About 1/3 of states plan to leverage new federal and open exchange technologies (DIRECT, CONNECT, etc.). Only one plan describes a centralized architecture for statewide HIE, but others combine central and federated architectural approaches. PMID:22195059

  13. Planning and Development of Lab Training Activities for Powerline Communications

    ERIC Educational Resources Information Center

    Drosopoulos, A.; Hatziprokopiou, M.

    2010-01-01

    This paper discusses the planning and development of student training and activities for the Powerline Communications Laboratory at the Technical Education Institute (TEI), Patras, Greece. Powerline communications is currently an active area of research and development that combines three separate specializations from the standard training of…

  14. Safety Standards Plan for Middlesex County Vocational & Technical High Schools.

    ERIC Educational Resources Information Center

    Sommer, Cy

    This vocational education safety standards plan outlines rules and regulations adopted by the Board of Education of Middlesex County Vocational and Technical High Schools. The first of eleven chapters presents demographics and a safety organization table for Middlesex County Vocational and Technical Schools. In chapter 2, six safety program…

  15. National Planning of Vocational and Technical Training. Colombo Plan Seminar. (Thimphu, Bhutan, April 19-22, 1976)

    ERIC Educational Resources Information Center

    Colombo Plan Bureau (Sri Lanka).

    Focusing on the last in a series of seven seminars conducted by the Colombo Plan Bureau between 1969 and 1975 on the theme, "National Planning of Vocational and Technical Training," this report presents the proceedings of a seminar on the vocational education and training needs of one of the Colombo Plan members, Bhutan. Five working…

  16. A National Periodicals Center Technical Development Plan.

    ERIC Educational Resources Information Center

    Council on Library Resources, Inc., Washington, DC.

    This technical plan for developing, managing, and operating a national periodicals center (NPC), which was prepared at the request of the Library of Congress, is designed so that it could be used by the Library or any other agency prepared to assume responsibility for the creation of a major periodicals facility. The overall goal of the NPC is to…

  17. Methodology for Planning Technical Education: With a Case Study of Polytechnics in Bangladesh.

    ERIC Educational Resources Information Center

    Ritzen, Jozef M.; Balderston, Judith B.

    A product of research first begun by one of the authors in Bangladesh, this book develops a comprehensive set of methods for planning technical education. Wherever possible, the authors draw on existing tools, fitting them to the specific context of technical education. When faced with planning problems for which existing methods are ill suited…

  18. The CHPRC Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fix, N. J.

    The scope of the CH2M Hill Plateau Remediation Company, LLC (CHPRC) Groundwater and Technical Integration Support (Master Project) is for Pacific Northwest National Laboratory staff to provide technical and integration support to CHPRC. This work includes conducting investigations at the 300-FF-5 Operable Unit and other groundwater operable units, and providing strategic integration, technical integration and assessments, remediation decision support, and science and technology. The projects under this Master Project will be defined and included within the Master Project throughout the fiscal year, and will be incorporated into the Master Project Plan. This Quality Assurance Management Plan provides the quality assurancemore » requirements and processes that will be followed by the CHPRC Groundwater and Technical Integration Support (Master Project) and all releases associated with the CHPRC Soil and Groundwater Remediation Project. The plan is designed to be used exclusively by project staff.« less

  19. Supplement to a Methodology for Succession Planning for Technical Experts

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kirk, Bernadette Lugue; Cain, Ronald A.; Agreda, Carla L.

    This report complements A Methodology for Succession Planning for Technical Experts (Ron Cain, Shaheen Dewji, Carla Agreda, Bernadette Kirk, July 2017), which describes a draft methodology for identifying and evaluating the loss of key technical skills at nuclear operations facilities. This report targets the methodology for identifying critical skills, and the methodology is tested through interviews with selected subject matter experts.

  20. A Navy Shore Activity Manpower Planning System for Civilians. Technical Report No. 24.

    ERIC Educational Resources Information Center

    Niehaus, R. J.; Sholtz, D.

    This report describes the U.S. Navy Shore Activity Manpower Planning System (SAMPS) advanced development research project. This effort is aimed at large-scale feasibility tests of manpower models for large Naval installations. These local planning systems are integrated with Navy-wide information systems on a data-communications network accessible…

  1. Homeroom Activities in a College of Technology Based on the Master Plan

    NASA Astrophysics Data System (ADS)

    Fuchida, Kunihiiko; Murata, Hideaki; Yuji, Junichiro

    Homeroom (HR) activities have an important role in engineering education at technical colleges. Yatsushiro National College of Technology has made a master plan for them and has been putting the plan into practical use since 2002. This plan is comprehensive and has two main categories, social education and career guidance, both being composed of three sub-categories (e.g., self-understanding and making future plans) . Based on the master plan, each HR teacher makes his own plan for HR activities for his classroom at the beginning of the academic year. We have reached a consensus to share our practice and to improve HR activities for years to come. We also recognize that to carry out HR activities based on a master plan that reflects the school's educational goals is essential in order to train students who are well-prepared, both as engineers and as humans.

  2. Development of Cooperative Planning for Technical-Vocational Programs.

    ERIC Educational Resources Information Center

    Cisco Junior Coll., TX.

    During the past decade vocational-technical education in Texas has grown so rapidly that now attention must be given to enrollments, employment projections, and more efficient utilization of the limited resources available. Cisco and Ranger Junior Colleges serve essentially the same population and a plan for close cooperation and coordination is…

  3. UK technical activities associated with the return to Earth of the MIR space station

    NASA Astrophysics Data System (ADS)

    Crowther, Richard; Tremayne-Smith, Richard

    2002-11-01

    The British National Space Centre (BNSC) acts as the focus in the United Kingdom (UK) for space-related activities. With the anticipated return to Earth of the MIR space station, BNSC established a group of technical experts to consider the associated implications for the UK, and to address both national and international activities relating to the planned de-orbit. In particular, the risk to the UK of an uncontrolled re-entry was considered in contingency planning and the means for the provision of accurate information to the public and media were established to ensure balanced view of the potential hazards that MIR posed to persons and property on the ground. The MIR de-orbit was exemplary, both in terms of the technical activities of the Rosaviakosmos and the safe disposal of MIR in the Pacific, and in relation to the open and effective communication between agencies and the positive reporting by the media.

  4. Interim Status Closure Plan Open Burning Treatment Unit Technical Area 16-399 Burn Tray

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vigil-Holterman, Luciana R.

    2012-05-07

    This closure plan describes the activities necessary to close one of the interim status hazardous waste open burning treatment units at Technical Area (TA) 16 at the Los Alamos National Laboratory (LANL or the Facility), hereinafter referred to as the 'TA-16-399 Burn Tray' or 'the unit'. The information provided in this closure plan addresses the closure requirements specified in the Code of Federal Regulations (CFR), Title 40, Part 265, Subparts G and P for the thermal treatment units operated at the Facility under the Resource Conservation and Recovery Act (RCRA) and the New Mexico Hazardous Waste Act. Closure of themore » open burning treatment unit will be completed in accordance with Section 4.1 of this closure plan.« less

  5. New Concepts in Vocational-Technical Programs and Planning.

    ERIC Educational Resources Information Center

    Mochon, Clint

    The latest principle behind designing and planning vocational-technical school is "built-in-pride", which must be motivated in both student and surrounding community. We are at last emerging from the dark tunnel of the "trade school", away from the cold institutional look, the clamor of shop classrooms, echoing corridors, and the invisible tattoo…

  6. A Strategic Plan for Texas State Technical Institute.

    ERIC Educational Resources Information Center

    Texas State Technical Inst., Waco.

    Following two decades of growth, both enrollment and funding at the Texas State Technical Institute (TSTI) have declined sharply over the last 5 years. In April 1989, the TSTI initiated a strategic planning process incorporating a strategy based on meeting a clearly recognized and understood public need that is within the role, scope, and mission…

  7. NASA Space Environments Technical Discipline Team Space Weather Activities

    NASA Astrophysics Data System (ADS)

    Minow, J. I.; Nicholas, A. C.; Parker, L. N.; Xapsos, M.; Walker, P. W.; Stauffer, C.

    2017-12-01

    The Space Environment Technical Discipline Team (TDT) is a technical organization led by NASA's Technical Fellow for Space Environments that supports NASA's Office of the Chief Engineer through the NASA Engineering and Safety Center. The Space Environments TDT conducts independent technical assessments related to the space environment and space weather impacts on spacecraft for NASA programs and provides technical expertise to NASA management and programs where required. This presentation will highlight the status of applied space weather activities within the Space Environment TDT that support development of operational space weather applications and a better understanding of the impacts of space weather on space systems. We will first discuss a tool that has been developed for evaluating space weather launch constraints that are used to protect launch vehicles from hazardous space weather. We then describe an effort to better characterize three-dimensional radiation transport for CubeSat spacecraft and processing of micro-dosimeter data from the International Space Station which the team plans to make available to the space science community. Finally, we will conclude with a quick description of an effort to maintain access to the real-time solar wind data provided by the Advanced Composition Explorer satellite at the Sun-Earth L1 point.

  8. Development of an Updated Strategic Marketing Plan for Fox Valley Technical College.

    ERIC Educational Resources Information Center

    May, Susan A.

    This project was conducted to develop a comprehensive strategic marketing plan for Fox Valley Technical College (FVTC). Components included a review of the literature, establishing criteria for the plan, validation of the criteria, the actual development of the plan involving a formative committee, and the review of institutional marketing plans…

  9. INDOT Technical Training Plan : [Technical Summary

    DOT National Transportation Integrated Search

    2012-01-01

    A wide range of job classifications, increasing technical : performance expectations, licensing and certification requirements, : budget restrictions and frequent department : reorganization has made technical training of employees : more difficult, ...

  10. Pellissippi State Technical Community College Five-Year Strategic Planning Directions, 1998-2003.

    ERIC Educational Resources Information Center

    Pellissippi State Technical Community Coll., Knoxville, TN.

    The document contains the strategic plan for Pellissippi State Technical Community College (Tennessee). The previous five-year strategic plan, "The Pathfinder Project," was prepared in 1994 but was out of date before the end of the five-year planning cycle. To secure information for projecting new five-year strategic directions and goals…

  11. Chattanooga State Technical Community College Marketing Plan 1981-82.

    ERIC Educational Resources Information Center

    Hoppe, Sherry; Haddock, David

    Chattanooga State Technical Community College's (CSTCC's) marketing plan is presented in six parallel sections. The first of these deals with building the overall image of the college, increasing community awareness, and disseminating general information. The other five sections focus on marketing the following college programs and services:…

  12. 75 FR 27341 - Increasing Market and Planning Efficiency Through Improved Software; Notice of Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-14

    ... Market and Planning Efficiency Through Improved Software; Notice of Technical Conference To Discuss Increasing Market and Planning Efficiency Through Improved Software May 7, 2010. Take notice that Commission... planning efficiency through improved software. [[Page 27342

  13. Active microwave users working group program planning

    NASA Technical Reports Server (NTRS)

    Ulaby, F. T.; Bare, J.; Brown, W. E., Jr.; Childs, L. F.; Dellwig, L. F.; Heighway, J. E.; Joosten, R.; Lewis, A. J.; Linlor, W.; Lundien, J. R.

    1978-01-01

    A detailed programmatic and technical development plan for active microwave technology was examined in each of four user activities: (1) vegetation; (2) water resources and geologic applications, and (4) oceanographic applications. Major application areas were identified, and the impact of each application area in terms of social and economic gains were evaluated. The present state of knowledge of the applicability of active microwave remote sensing to each application area was summarized and its role relative to other remote sensing devices was examined. The analysis and data acquisition techniques needed to resolve the effects of interference factors were reviewed to establish an operational capability in each application area. Flow charts of accomplished and required activities in each application area that lead to operational capability were structured.

  14. Field Test of the Methodology for Succession Planning for Technical Experts

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cain, Ronald A.; Kirk, Bernadette Lugue; Agreda, Carla L.

    This report complements A Methodology for Succession Planning for Technical Experts (Ron Cain, Shaheen Dewji, Carla Agreda, Bernadette Kirk, July 2017), which describes a methodology for identifying and evaluating the loss of key technical skills at nuclear operations facilities. This report targets the methodology for identifying critical skills, hereafter referred to as “core competencies”. The methodology has been field tested by interviewing selected retiring subject matter experts (SMEs).

  15. Technical aspects of positron emission tomography/computed tomography in radiotherapy treatment planning.

    PubMed

    Scripes, Paola G; Yaparpalvi, Ravindra

    2012-09-01

    The usage of functional data in radiation therapy (RT) treatment planning (RTP) process is currently the focus of significant technical, scientific, and clinical development. Positron emission tomography (PET) using ((18)F) fluorodeoxyglucose is being increasingly used in RT planning in recent years. Fluorodeoxyglucose is the most commonly used radiotracer for diagnosis, staging, recurrent disease detection, and monitoring of tumor response to therapy (Lung Cancer 2012;76:344-349; Lung Cancer 2009;64:301-307; J Nucl Med 2008;49:532-540; J Nucl Med 2007;48:58S-67S). All the efforts to improve both PET and computed tomography (CT) image quality and, consequently, lesion detectability have a common objective to increase the accuracy in functional imaging and thus of coregistration into RT planning systems. In radiotherapy, improvement in target localization permits reduction of tumor margins, consequently reducing volume of normal tissue irradiated. Furthermore, smaller treated target volumes create the possibility of dose escalation, leading to increased chances of tumor cure and control. This article focuses on the technical aspects of PET/CT image acquisition, fusion, usage, and impact on the physics of RTP. The authors review the basic elements of RTP, modern radiation delivery, and the technical parameters of coregistration of PET/CT into RT computerized planning systems. Copyright © 2012 Elsevier Inc. All rights reserved.

  16. National Data Program for the Marine Environment Technical Development Plan. Final Report, Volume Two.

    ERIC Educational Resources Information Center

    System Development Corp., Santa Monica, CA.

    A national data program for the marine environment is recommended. Volume 2 includes: (1) objectives, scope, and methodology; (2) summary of the technical development plan; (3) agency development plans - Great Lakes and coastal development and (4) marine data network development plans. (Author)

  17. New Directions for High School Career and Technical Education in Wyoming: A Strategic Plan

    ERIC Educational Resources Information Center

    Hoachlander, Gary; Klein, Steven; Studier, Carol

    2007-01-01

    This report offers a plan for improving career and technical education (CTE) in Wyoming, but it is about more than just technical education. Realizing the potential of CTE to contribute to students' mastery of both academic and technical knowledge depends not only on strengthening the CTE curriculum, but also on embedding CTE in a larger program…

  18. Practical Problems in Connection with the Planning and Introduction of Information Systems. Technical Report.

    ERIC Educational Resources Information Center

    Klose, Traugott

    Major reforms brought about in July 1969 at the Free University of Berlin in its organization, planning, and decision making are reviewed. Specific problems are addressed, such as plans for introducing an information system on technical data and space use, plans for an information system on personnel employed by the university, and plans for an…

  19. Western Tier Trichloroethylene Investigation Technical Plan. Version 3. 1

    DTIC Science & Technology

    1987-10-01

    07p-o018.4 - 7’i.j -s 7,ze Ns vý-c~~f 0MB to.0 o,*%18 .. ý’ *. 4 -, I **5 1 "a! *- " -- .e..~’-!:c -~~ ’%as-ý9Ct, :C I. AUEENCY JSE ONLY .. eve DiarK...OBJECTIVES OF TASK 38 ARE TO: 1 . DETERMINE THE SOURCE(S) OF TRCLE IN THE WESTERN TIER 2. FOR EACH SOURCE, DEFINE THE CONTAMINANT PLUME 3. ESTIMATE THE...e. I TASK 38 TECHNICAL PLAN I TABLE OF CONTENTS i Sectio PA 1.0 INTRODUCTION 1 - 1 1 1.1 Background 1 - 1 1.2 Technical ADproach 1 -2 1.3 Areas to be

  20. Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fix, N. J.

    The scope of the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) is to provide technical and integration support to Fluor Hanford, Inc., including operable unit investigations at 300-FF-5 and other groundwater operable units, strategic integration, technical integration and assessments, remediation decision support, and science and technology. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project).

  1. 75 FR 16499 - Notice of Availability of a Technical Agency Draft Recovery Plan for Pyne's Ground-Plum...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-01

    ...] Notice of Availability of a Technical Agency Draft Recovery Plan for Pyne's Ground-Plum (Astragalus... availability of the technical agency draft recovery plan for Pyne's ground-plum (Astragalus bibullatus), a...: Background We listed Pyne's ground-plum as an endangered species under the Act (16 U.S.C. 1531 et seq.), on...

  2. 34 CFR 300.119 - Technical assistance and training activities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false Technical assistance and training activities. 300.119... Technical assistance and training activities. Each SEA must carry out activities to ensure that teachers and....114; and (b) Are provided with technical assistance and training necessary to assist them in this...

  3. Three-dimensional path planning software-assisted transjugular intrahepatic portosystemic shunt: a technical modification.

    PubMed

    Tsauo, Jiaywei; Luo, Xuefeng; Ye, Linchao; Li, Xiao

    2015-06-01

    This study was designed to report our results with a modified technique of three-dimensional (3D) path planning software assisted transjugular intrahepatic portosystemic shunt (TIPS). 3D path planning software was recently developed to facilitate TIPS creation by using two carbon dioxide portograms acquired at least 20° apart to generate a 3D path for overlay needle guidance. However, one shortcoming is that puncturing along the overlay would be technically impossible if the angle of the liver access set and the angle of the 3D path are not the same. To solve this problem, a prototype 3D path planning software was fitted with a utility to calculate the angle of the 3D path. Using this, we modified the angle of the liver access set accordingly during the procedure in ten patients. Failure for technical reasons occurred in three patients (unsuccessful wedged hepatic venography in two cases, software technical failure in one case). The procedure was successful in the remaining seven patients, and only one needle pass was required to obtain portal vein access in each case. The course of puncture was comparable to the 3D path in all patients. No procedure-related complication occurred following the procedures. Adjusting the angle of the liver access set to match the angle of the 3D path determined by the software appears to be a favorable modification to the technique of 3D path planning software assisted TIPS.

  4. Integrating Science with Technical and Vocational Areas.

    ERIC Educational Resources Information Center

    Snyder, Larry; Shreckengast, Craig

    This guide presents learning activities and lesson plans that integrate science with technical and vocational areas. Activities and plans are organized under broad headings such as Environmental Science and Acid Rain Research; Criminal Justice, Chemistry, and Narcotics; Children's Education and Services; Cosmetology; and Health Professions.…

  5. Three-Dimensional Path Planning Software-Assisted Transjugular Intrahepatic Portosystemic Shunt: A Technical Modification

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tsauo, Jiaywei, E-mail: 80732059@qq.com; Luo, Xuefeng, E-mail: luobo-913@126.com; Ye, Linchao, E-mail: linchao.ye@siemens.com

    2015-06-15

    PurposeThis study was designed to report our results with a modified technique of three-dimensional (3D) path planning software assisted transjugular intrahepatic portosystemic shunt (TIPS).Methods3D path planning software was recently developed to facilitate TIPS creation by using two carbon dioxide portograms acquired at least 20° apart to generate a 3D path for overlay needle guidance. However, one shortcoming is that puncturing along the overlay would be technically impossible if the angle of the liver access set and the angle of the 3D path are not the same. To solve this problem, a prototype 3D path planning software was fitted with a utility to calculate themore » angle of the 3D path. Using this, we modified the angle of the liver access set accordingly during the procedure in ten patients.ResultsFailure for technical reasons occurred in three patients (unsuccessful wedged hepatic venography in two cases, software technical failure in one case). The procedure was successful in the remaining seven patients, and only one needle pass was required to obtain portal vein access in each case. The course of puncture was comparable to the 3D path in all patients. No procedure-related complication occurred following the procedures.ConclusionsAdjusting the angle of the liver access set to match the angle of the 3D path determined by the software appears to be a favorable modification to the technique of 3D path planning software assisted TIPS.« less

  6. Planning as an Iterative Process

    NASA Technical Reports Server (NTRS)

    Smith, David E.

    2012-01-01

    Activity planning for missions such as the Mars Exploration Rover mission presents many technical challenges, including oversubscription, consideration of time, concurrency, resources, preferences, and uncertainty. These challenges have all been addressed by the research community to varying degrees, but significant technical hurdles still remain. In addition, the integration of these capabilities into a single planning engine remains largely unaddressed. However, I argue that there is a deeper set of issues that needs to be considered namely the integration of planning into an iterative process that begins before the goals, objectives, and preferences are fully defined. This introduces a number of technical challenges for planning, including the ability to more naturally specify and utilize constraints on the planning process, the ability to generate multiple qualitatively different plans, and the ability to provide deep explanation of plans.

  7. [Acoustic conditions in open plan office - Application of technical measures in a typical room].

    PubMed

    Mikulski, Witold

    2018-03-09

    Noise in open plan offices should not exceed acceptable levels for the hearing protection. Its major negative effects on employees are nuisance and impediment in execution of work. Specific technical solutions should be introduced to provide proper acoustic conditions for work performance. Acoustic evaluation of a typical open plan office was presented in the article published in "Medycyna Pracy" 5/2016. None of the rooms meets all the criteria, therefore, in this article one of the rooms was chosen to apply different technical solutions to check the possibility of reaching proper acoustic conditions. Acoustic effectiveness of those solutions was verified by means of digital simulation. The model was checked by comparing the results of measurements and calculations before using simulation. The analyzis revealed that open plan offices supplemented with signals for masking speech signals can meet all the required criteria. It is relatively easy to reach proper reverberation time (i.e., sound absorption). It is more difficult to reach proper values of evaluation parameters determined from A-weighted sound pressure level (SPLA) of speech. The most difficult is to provide proper values of evaluation parameters determined from speech transmission index (STI). Finally, it is necessary (besides acoustic treatment) to use devices for speech masking. The study proved that it is technically possible to reach proper acoustic condition. Main causes of employees complaints in open plan office are inadequate acoustic work conditions. Therefore, it is necessary to apply specific technical solutions - not only sound absorbing suspended ceiling and high acoustic barriers, but also devices for speech masking. Med Pr 2018;69(2):153-165. This work is available in Open Access model and licensed under a CC BY-NC 3.0 PL license.

  8. Succession Planning for Management Staff at a Canadian Post Secondary Technical Institute.

    ERIC Educational Resources Information Center

    da Costa, Jose; Cembrowski, Barbara

    2001-01-01

    Analyzed interviews to explore how nine administrators, at three different career stages, perceived career-development and succession planning at a Canadian postsecondary technical institute. Managers attribute career success to possession of varied personal attributes, diverse work experiences, serendipity, and a fulfilling work environment. Job…

  9. Multicentre analysis of treatment planning information: technical requirements, possible applications and a proposal.

    PubMed

    Ebert, M A; Blight, J; Price, S; Haworth, A; Hamilton, C; Cornes, D; Joseph, D J

    2004-09-01

    Digital data from 3-D treatment planning computers is generally used for patient planning and then never considered again. However, such data contains enormous quantities of information regarding patient geometries, tissue outlining, treatment approaches and dose distributions. Were such data accessible from planning systems from multiple manufacturers, there would be substantial opportunities for undertaking quality assurance of radiotherapy clinical trials, prospective assessment of trial outcomes and basic treatment planning research and development. The technicalities of data exchange between planning systems are outlined, and previous attempts at producing systems capable of viewing and/or manipulating imaging and radiotherapy digital data reviewed. Development of a software system for enhancing the quality of Australasian clinical trials is proposed.

  10. Minnesota Area Vocational-Technical Institutes. A Plan to Address Declining Enrollments and Resources. Submitted to the Minnesota State Legislature

    ERIC Educational Resources Information Center

    Minnesota State Board for Vocational Education, St. Paul.

    In March 1982, the Minnesota Division of Vocational-Technical Education received requests from State legislators to develop an action plan to address the problems of declining enrollments and resources. In response to this request, a plan was developed whereby area vocational-technical institutes (AVTIs) in the State would (1) promote a process…

  11. Guidelines for the planning and preparation of illustrated technical talks

    NASA Technical Reports Server (NTRS)

    Hubbard, H. H.

    1975-01-01

    Guidelines are presented for the preparation of illustrated talks which are audience oriented and which are aimed at the efficient transfer of technical information. Early decisions concerning the required number of slides are helpful in initial planning for a good quality talk. Detailed considerations are: the establishment of limited objectives, selection of appropriate slide material, development of a text which is well coordinated with the slides, and accurate timing.

  12. Succession Planning for Management Staff at a Western Canadian Postsecondary Technical Institute.

    ERIC Educational Resources Information Center

    Cembrowski, Barbara Joan; da Costa, Jose L.

    This study used naturalistic inquiry to gain an understanding of how managerial personnel perceived career development and succession planning at a postsecondary technical institute in Canada. A total of nine individuals in three different career development stages completed semistructured interviews. It was found that managers perceived the…

  13. The Birth of a New Vocational-Technical Center. National Vocational-Technical Facility Planning Conference (Las Vegas, Nevada, May, 1967).

    ERIC Educational Resources Information Center

    Farnsworth, Clayton

    The principal of the Southern Nevada Vocational-Technical Center at Las Vegas, Nevada, briefly outlines its development and function. The facility cost approximately 3 million dollars and was built on 390 acres of land purchased from the Federal government. The PERT method was used in planning. Instructional facilities, including those for auto…

  14. A&M. Technical service laboratory in administration building (TAN602). Floor plan, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    A&M. Technical service laboratory in administration building (TAN-602). Floor plan, reception desk, door and finish schedules. Ralph M. Parsons 1480-12-ANP/GE-3-602-A-1. INEEL index code no. 033-0602-00-693-107488 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  15. Career Opportunities in Texas: A Master Plan for Vocational and Technical Education (1989 Update).

    ERIC Educational Resources Information Center

    Texas State Board of Education, Austin.

    In January 1987, a Master Plan for the delivery of vocational and technical education in Texas was adopted by the State Board of Education (SBOE). The master plan details goals and strategies to assist in the development of a skilled and educated work force in Texas as the state enters the 21st century. As part of their mandated annual review…

  16. Enhancing Effective Stakeholder Participation in Local Groundwater Sustainability Planning through Technical Assistance in California

    NASA Astrophysics Data System (ADS)

    Weintraub, C.; Christian-Smith, J.; Dobbin, K.; Cullen, K.

    2017-12-01

    This presentation will share content from UCS's new publication, Getting Involved in Groundwater; A Guide to Effective Engagement in California's Groundwater Sustainability Plans, as well as lessons learned from collaborating with community organizations to provide technical assistance to Groundwater Sustainability Agency (GSA) board members and stakeholders in the San Joaquin Valley on Groundwater Sustainability Plan (GSP) development. California's Sustainable Groundwater Management Act (SGMA) mandates extensive stakeholder engagement, presenting an opportunity for unincorporated, low-income communities that have historically been affected by but not included in water decisions. However, implementation requires a concerted, thoughtful effort. Through technical assistance and strategic outreach, the Union of Concerned Scientists (UCS) is working to ensure stakeholder engagement in GSP development is robust, diverse, and supported by the best science available. UCS created the GSP stakeholder engagement guide to equip GSA members, scientists and interested community members to meaningfully engage in the GSP development process. The guide serves as a technical primer on SGMA's GSP process and as a resource for understanding groundwater management in California. The guide is just one component of a larger effort to overcome barriers to effective engagement in sustainable groundwater management, especially those presented by technical information. In April, UCS co-hosted a technical assistance workshop for GSA and advisory committee members in Visalia, CA with the Community Water Center (CWC), a local environmental justice non-profit. The workshop was well received and UCS and the CWC were invited to host a second workshop in June. To deepen this engagement and provide one-on-one technical assistance, UCS developed a program to match relevant water experts in the UCS Science Network with GSA members or involved community members in need of specific technical support

  17. Long-Range Plan for Gateway Technical Institute. 1982-1987: Serving Kenosha, Racine, and Walworth Counties.

    ERIC Educational Resources Information Center

    Stoehr, Keith W.; Covelli, Nicholas J.

    This report presents Gateway Technical Institute's long-range plan for 1982-1987. After prefatory material discussing financial and non-financial factors that may impinge on the plan, Chapter I outlines the socioeconomic situation in the three-county area of Wisconsin served by the college and introduces some of the critical issues that the…

  18. Technical-Oriented Enterprise Resource Planning (ERP) Body of Knowledge for Information Systems Programs: Content and Implementation

    ERIC Educational Resources Information Center

    Boyle, Todd A.

    2007-01-01

    In this article, the author proposes a body of knowledge that the educators can use to incorporate the technical aspects of enterprise resource planning (ERP) into an information systems (IS) program, encapsulated as the ERP technical knowledge framework. To illustrate the application of this framework, the author discusses a course sequence that…

  19. Quality-assurance plan for water-resources activities of the U.S. Geological Survey in Idaho

    USGS Publications Warehouse

    Packard, F.A.

    1996-01-01

    To ensure continued confidence in its products, the Water Resources Division of the U.S. Geological Survey implemented a policy that all its scientific work be performed in accordance with a centrally managed quality-assurance program. This report establishes and documents a formal policy for current (1995) quality assurance within the Idaho District of the U.S. Geological Survey. Quality assurance is formalized by describing district organization and operational responsibilities, documenting the district quality-assurance policies, and describing district functions. The districts conducts its work through offices in Boise, Idaho Falls, Twin Falls, Sandpoint, and at the Idaho National Engineering Laboratory. Data-collection programs and interpretive studies are conducted by two operating units, and operational and technical assistance is provided by three support units: (1) Administrative Services advisors provide guidance on various personnel issues and budget functions, (2) computer and reports advisors provide guidance in their fields, and (3) discipline specialists provide technical advice and assistance to the district and to chiefs of various projects. The district's quality-assurance plan is based on an overall policy that provides a framework for defining the precision and accuracy of collected data. The plan is supported by a series of quality-assurance policy statements that describe responsibilities for specific operations in the district's program. The operations are program planning; project planning; project implementation; review and remediation; data collection; equipment calibration and maintenance; data processing and storage; data analysis, synthesis, and interpretation; report preparation and processing; and training. Activities of the district are systematically conducted under a hierarchy of supervision an management that is designed to ensure conformance with Water Resources Division goals quality assurance. The district quality

  20. Integrated corridor management initiative : demonstration phase evaluation – Dallas technical capability analysis test plan.

    DOT National Transportation Integrated Search

    2012-08-01

    This report presents the test plan for conducting the Technical Capability Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor Management (ICM) Initiative Demonstration. The ICM ...

  1. 7 CFR 1485.15 - Activity plan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 10 2011-01-01 2011-01-01 false Activity plan. 1485.15 Section 1485.15 Agriculture... MARKETS FOR AGRICULTURAL COMMODITIES Market Access Program § 1485.15 Activity plan. (a) General. A participant shall develop a specific activity plan(s) based on its strategic plan and the allocation approval...

  2. International Assistance for Low-Emission Development Planning: Coordinated Low Emissions Assistance Network (CLEAN) Inventory of Activities and Tools--Preliminary Trends

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cox, S.; Benioff, R.

    2011-05-01

    The Coordinated Low Emissions Assistance Network (CLEAN) is a voluntary network of international practitioners supporting low-emission planning in developing countries. The network seeks to improve quality of support through sharing project information, tools, best practices and lessons, and by fostering harmonized assistance. CLEAN has developed an inventory to track and analyze international technical support and tools for low-carbon planning activities in developing countries. This paper presents a preliminary analysis of the inventory to help identify trends in assistance activities and tools available to support developing countries with low-emission planning.

  3. Integrated Application of Active Controls (IAAC) Technology to an Advanced Subsonic Transport: Project Plan

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The state of the art of active controls technology (ACT) and a recommended ACT development program plan are reviewed. The performance benefits and cost of ownership of an integrated application of ACT to civil transport aircraft is to be assessed along with the risk and laboratory and/or flight experiments designed to reduce the technical risks to a commercially acceptable level.

  4. Technical Work Plan for: Thermodynamic Database for Chemical Modeling

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    C.F. Jovecolon

    The objective of the work scope covered by this Technical Work Plan (TWP) is to correct and improve the Yucca Mountain Project (YMP) thermodynamic databases, to update their documentation, and to ensure reasonable consistency among them. In addition, the work scope will continue to generate database revisions, which are organized and named so as to be transparent to internal and external users and reviewers. Regarding consistency among databases, it is noted that aqueous speciation and mineral solubility data for a given system may differ according to how solubility was determined, and the method used for subsequent retrieval of thermodynamic parametermore » values from measured data. Of particular concern are the details of the determination of ''infinite dilution'' constants, which involve the use of specific methods for activity coefficient corrections. That is, equilibrium constants developed for a given system for one set of conditions may not be consistent with constants developed for other conditions, depending on the species considered in the chemical reactions and the methods used in the reported studies. Hence, there will be some differences (for example in log K values) between the Pitzer and ''B-dot'' database parameters for the same reactions or species.« less

  5. Visual Knowledge in Tactical Planning: Preliminary Knowledge Acquisition Phase 1 Technical Report

    DTIC Science & Technology

    1990-04-05

    MANAGEMENT INFORMATION , COMMUNICATIONS, AND COMPUTER SCIENCES Visual Knowledge in Tactical Planning: Preliminary Knowledge Acquisition Phase I Technical...perceived provides information in multiple modalities and, in fact, we may rely on a non-verbal mode for much of our understanding of the situation...some tasks, almost all the pertinent information is provided via diagrams, maps, znd other illustrations. Visual Knowledge Visual experience forms a

  6. Virtual Preoperative Planning and Intraoperative Navigation in Facial Prosthetic Reconstruction: A Technical Note.

    PubMed

    Verma, Suzanne; Gonzalez, Marianela; Schow, Sterling R; Triplett, R Gilbert

    This technical protocol outlines the use of computer-assisted image-guided technology for the preoperative planning and intraoperative procedures involved in implant-retained facial prosthetic treatment. A contributing factor for a successful prosthetic restoration is accurate preoperative planning to identify prosthetically driven implant locations that maximize bone contact and enhance cosmetic outcomes. Navigational systems virtually transfer precise digital planning into the operative field for placing implants to support prosthetic restorations. In this protocol, there is no need to construct a physical, and sometimes inaccurate, surgical guide. The report addresses treatment workflow, radiologic data specifications, and special considerations in data acquisition, virtual preoperative planning, and intraoperative navigation for the prosthetic reconstruction of unilateral, bilateral, and midface defects. Utilization of this protocol for the planning and surgical placement of craniofacial bone-anchored implants allows positioning of implants to be prosthetically driven, accurate, precise, and efficient, and leads to a more predictable treatment outcome.

  7. 76 FR 28022 - Increasing Market and Planning Efficiency Through Improved Software; Notice of Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-13

    ... Market and Planning Efficiency Through Improved Software; Notice of Technical Conference: Increasing Real-Time and Day- Ahead Market Efficiency Through Improved Software Take notice that Commission staff will... for increasing real-time and day-ahead market efficiency through improved software. This conference...

  8. Strategic Mobility 21 Technical Plan

    DTIC Science & Technology

    2006-09-06

    or grant. b. Technical documents with this statement may be made available or sold to the public and foreign nationals, companies, and governments ...including adversary governments , and may be exported. c. This statement may not be used on technical documents that formerly were classified...Transportation Technologies (CCDOTT), a government -industry academic collaborative enterprise. 2 Dual-use technology serves as a basis for both

  9. Technical Review of Retrieval and Closure Plans for the INEEL INTEC Tank Farm Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bamberger, Judith A; Burks, Barry L; Quigley, Keith D

    2001-09-28

    The purpose of this report is to document the conclusions of a technical review of retrieval and closure plans for the Idaho National Energy and Environmental Laboratory (INEEL) Idaho Nuclear Technology and Engineering Center (INTEC) Tank Farm Facility. In addition to reviewing retrieval and closure plans for these tanks, the review process served as an information exchange mechanism so that staff in the INEEL High Level Waste (HLW) Program could become more familiar with retrieval and closure approaches that have been completed or are planned for underground storage tanks at the Oak Ridge National Laboratory (ORNL) and Hanford sites. Thismore » review focused not only on evaluation of the technical feasibility and appropriateness of the approach selected by INEEL but also on technology gaps that could be addressed through utilization of technologies or performance data available at other DOE sites and in the private sector. The reviewers, Judith Bamberger of Pacific Northwest National Laboratory (PNNL) and Dr. Barry Burks of The Providence Group Applied Technology, have extensive experience in the development and application of tank waste retrieval technologies for nuclear waste remediation.« less

  10. 77 FR 19280 - Increasing Market and Planning Efficiency Through Improved Software; Notice of Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-30

    ... Market and Planning Efficiency Through Improved Software; Notice of Technical Conference: Increasing Real-Time and Day- Ahead Market Efficiency Through Improved Software Take notice that Commission staff will...-time and day-ahead market efficiency through improved software. A detailed agenda with the list of and...

  11. Field Implementation Plan for the In-Situ Bioremediation Treatability Study at the Technical Area-V Groundwater Area of Concern

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Li, Jun

    This Field Implementation Plan (FIP) was prepared by Sandia National Laboratories, New Mexico (SNL/NM) and provides instruction on conducting a series of in-situ bioremediation (ISB) tests as described in the Revised Treatability Study Work Plan for In-Situ Bioremediation at the Technical Area-V Groundwater Area of Concern, referred to as the Revised Work Plan in this FIP. The Treatability Study is designed to gravity inject an electron-donor substrate and bioaugmentation bacteria into groundwater via three injection wells to perform bioremediation of the constituents of concern (COCs), nitrate and trichloroethene (TCE), in the regions with the highest concentrations at the Technical Area-Vmore » Groundwater (TAVG) Area of Concern (AOC). The Treatability Study will evaluate the effectiveness of bioremediation solution delivery and COC treatment over time. This FIP is designed for SNL/NM work planning and management. It is not intended to be submitted for regulator’s approval. The technical details presented in this FIP are subject to change based on field conditions, availability of equipment and materials, feasibility, and inputs from Sandia personnel and Aboveground Injection System contractor.« less

  12. Technical activities of the configuration aeroelasticity branch

    NASA Technical Reports Server (NTRS)

    Cole, Stanley R. (Editor)

    1991-01-01

    A number of recent technical activities of the Configuration Aeroelasticity Branch of the NASA Langley Research Center are discussed in detail. The information on the research branch is compiled in twelve separate papers. The first of these topics is a summary of the purpose of the branch, including a full description of the branch and its associated projects and program efforts. The next ten papers cover specific projects and are as follows: Experimental transonic flutter characteristics of supersonic cruise configurations; Aeroelastic effects of spoiler surfaces mounted on a low aspect ratio rectangular wing; Planform curvature effects on flutter of 56 degree swept wing determined in Transonic Dynamics Tunnel (TDT); An introduction to rotorcraft testing in TDT; Rotorcraft vibration reduction research at the TDT; A preliminary study to determine the effects of tip geometry on the flutter of aft swept wings; Aeroelastic models program; NACA 0012 pressure model and test plan; Investigation of the use of extension twist coupling in composite rotor blades; and Improved finite element methods for rotorcraft structures. The final paper describes the primary facility operation by the branch, the Langley TDT.

  13. The Technical Assistance Program: A Program Plan.

    DTIC Science & Technology

    1985-09-01

    interests, talents, and hobbies of current employees who wish to become involved in the technical assistance program . 4. Capitalize on the corporate...Center San Diego, CA 92152 Telephone (619) 225-6281 B-33 TAP ( EMPLOYEE ) QUESTIONNAIRE - The Technical Assistance Program (TAP) links technically skilled...Brochure, "Retired Technologist" C-11 C. Sample Letter to NOSC Employees C-13 Brochure D. The Technical Assistance Program C-15 C-1

  14. 7 CFR 1485.15 - Activity plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... participant shall develop a specific activity plan(s) based on its strategic plan and the allocation approval... any changes in strategy from the strategic plan; (iii) A budget for each proposed activity, identifying the source of funds; (iv) Specific goals and benchmarks to be used to measure the effectiveness of...

  15. Analysis and Prospects of European Co-Operation in the Field of Regional Planning. Activity Report of the Committee of Senior Officials 1976-1978.

    ERIC Educational Resources Information Center

    Council of Europe, Strasbourg (France).

    To guide future work, to provide an overall view of the program of technical cooperation in regional planning, and to form a basis for a Conference Ministerial Resolution, the report outlines the activities of the Committee of Senior Officials (CSO) of the Council of Europe's Conference of Ministers Responsible for Regional Planning during…

  16. OSH technical reference manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-11-01

    In an evaluation of the Department of Energy (DOE) Occupational Safety and Health programs for government-owned contractor-operated (GOCO) activities, the Department of Labor`s Occupational Safety and Health Administration (OSHA) recommended a technical information exchange program. The intent was to share written safety and health programs, plans, training manuals, and materials within the entire DOE community. The OSH Technical Reference (OTR) helps support the secretary`s response to the OSHA finding by providing a one-stop resource and referral for technical information that relates to safe operations and practice. It also serves as a technical information exchange tool to reference DOE-wide materials pertinentmore » to specific safety topics and, with some modification, as a training aid. The OTR bridges the gap between general safety documents and very specific requirements documents. It is tailored to the DOE community and incorporates DOE field experience.« less

  17. Life sciences payloads analyses and technical program planning studies. [project planning of space missions of space shuttles in aerospace medicine and space biology

    NASA Technical Reports Server (NTRS)

    1976-01-01

    Contractural requirements, project planning, equipment specifications, and technical data for space shuttle biological experiment payloads are presented. Topics discussed are: (1) urine collection and processing on the space shuttle, (2) space processing of biochemical and biomedical materials, (3) mission simulations, and (4) biomedical equipment.

  18. Administrative Information Systems Plan for FY89

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1988-11-01

    The Administrative Information Systems (AIS) Plan was developed to prioritize, track, and control the cost of AIS activities. This annually published plan, in conjunction with quarterly status reports, measures projected AIS activities and progress. The AIS Plan and quarterly reporting are administered jointly by the Director of Computing and an Organization 30 director. Priority development projects are clearly defined and closely managed efforts that consume significant resources. Directorate supplementals describe other AIS activity within each directorate, which may include: production support; technical support; development activity; and other AIS effort.

  19. Which characteristics of planning matter? Individual and dyadic physical activity plans and their effects on plan enactment.

    PubMed

    Keller, Jan; Fleig, Lena; Hohl, Diana Hilda; Wiedemann, Amelie U; Burkert, Silke; Luszczynska, Aleksandra; Knoll, Nina

    2017-09-01

    Past research supports individual planning as an effective intervention strategy to increase physical activity in individuals. A similar strategy, dyadic planning, adds a planning partner who supports an individual's planning processes. Whether the two planning formats differ in terms of participants' entered plan content and whether and how different content characteristics are linked to plan enactment remains unknown. By investigating the content of generated plans, this study aimed at distinguishing plan characteristics of the two planning formats and examining their role as predictors of later plan enactment. Secondary analyses of a three-arm RCT with German couples (data collection between 2013 and 2015). Couples were assigned to an individual (IPC, n = 114) or dyadic planning condition (DPC, n = 111) and formulated up to 5 physical activity plans for a target person. Couples assigned to a control condition were not included as they did not generate plans. The following characteristics were distinguished and coded for each plan: number of planned opportunities, presence of a planned routine, planned cue- or activity-related specificity, activity-related intensity, and chronological plan rank. One week before (T0) and two weeks following (T2) the intervention (T1), increase vs. no increase of the planned activity was coded as a dichotomous plan enactment variable. Multilevel logistic regressions were fit. Plan enactment was higher in dyadic than in individual planners. Findings indicated that routines (e.g., after work) were positively related to plan enactment, whereas a high specificity of when-cues (e.g., Friday at 6.30 p.m.) showed a negative relationship. None of the examined plan characteristics could explain differences in enactment between IPC and DPC. Linking health behaviours to other behavioural routines seems beneficial for subsequent plan enactment. Dyadic planning was linked with higher enactment rates than individual planning. However, as

  20. Recreational technical diving part 1: an introduction to technical diving methods and activities.

    PubMed

    Mitchell, Simon J; Doolette, David J

    2013-06-01

    Technical divers use gases other than air and advanced equipment configurations to conduct dives that are deeper and/or longer than typical recreational air dives. The use of oxygen-nitrogen (nitrox) mixes with oxygen fractions higher than air results in longer no-decompression limits for shallow diving, and faster decompression from deeper dives. For depths beyond the air-diving range, technical divers mix helium, a light non-narcotic gas, with nitrogen and oxygen to produce 'trimix'. These blends are tailored to the depth of intended use with a fraction of oxygen calculated to produce an inspired oxygen partial pressure unlikely to cause cerebral oxygen toxicity and a nitrogen fraction calculated to produce a tolerable degree of nitrogen narcosis. A typical deep technical dive will involve the use of trimix at the target depth with changes to gases containing more oxygen and less inert gas during the decompression. Open-circuit scuba may be used to carry and utilise such gases, but this is very wasteful of expensive helium. There is increasing use of closed-circuit 'rebreather' devices. These recycle expired gas and potentially limit gas consumption to a small amount of inert gas to maintain the volume of the breathing circuit during descent and the amount of oxygen metabolised by the diver. This paper reviews the basic approach to planning and execution of dives using these methods to better inform physicians of the physical demands and risks.

  1. EPA Technical Support Centers (TSC): FY14 Lessons ...

    EPA Pesticide Factsheets

    EPA’s Technical Support Centers (TSC) included in ORD’s Safe and Healthy Communities (SHC) Research Action Plan fill the need for supplying subject-matter experts to continually assess state-of-the-art research and practices and channel this information to users in both direct applications (i.e., site-specific technical support) and general applications (i.e., technical transfer activities such as technical guidance documents, conferences, or workshops) . The TSCs are charged with providing solutions by: 1) linking EPA research to Agency decision-makers; 2) applying best practices to real world field applications; and 3) channeling feedback from field application to research communities. The TSP goal is to provide Regional Remedial Project Managers (RPMs), Corrective Action Staff, and On-Scene Coordinators (OSCs) with a diverse set of readily-accessible resources for technical assistance. This research summary provides six case studies – two from each of the three TSCs (Ground Water Technical Support Center, Engineering Technical Support Center, and Site Characterization Technical Support Center) – to exemplify and summarize the variety of TSC approaches that contribute to fulfilling the TSP mission. EPA’s Technical Support Centers (TSC) included in ORD’s Safe and Healthy Communities (SHC) Research Action Plan fill the need for supplying subject-matter experts to continually assess state-of-the-art research and practices and channel this informati

  2. Software for Planning Scientific Activities on Mars

    NASA Technical Reports Server (NTRS)

    Ai-Chang, Mitchell; Bresina, John; Jonsson, Ari; Hsu, Jennifer; Kanefsky, Bob; Morris, Paul; Rajan, Kanna; Yglesias, Jeffrey; Charest, Len; Maldague, Pierre

    2003-01-01

    Mixed-Initiative Activity Plan Generator (MAPGEN) is a ground-based computer program for planning and scheduling the scientific activities of instrumented exploratory robotic vehicles, within the limitations of available resources onboard the vehicle. MAPGEN is a combination of two prior software systems: (1) an activity-planning program, APGEN, developed at NASA s Jet Propulsion Laboratory and (2) the Europa planner/scheduler from NASA Ames Research Center. MAPGEN performs all of the following functions: Automatic generation of plans and schedules for scientific and engineering activities; Testing of hypotheses (or what-if analyses of various scenarios); Editing of plans; Computation and analysis of resources; and Enforcement and maintenance of constraints, including resolution of temporal and resource conflicts among planned activities. MAPGEN can be used in either of two modes: one in which the planner/scheduler is turned off and only the basic APGEN functionality is utilized, or one in which both component programs are used to obtain the full planning, scheduling, and constraint-maintenance functionality.

  3. An Assessment of Future Educational and Occupational Plans for Brevard Community College Technical Program Students.

    ERIC Educational Resources Information Center

    Whitehead, Everett

    This practicum studies the future educational and/or occupational plans of 223 technical program students enrolled in Brevard Community College (BCC) during the Fall 1973 term in order to suggest adjustments in college procedures to facilitate student transition to continued college or to their chosen professions. The characteristics of technical…

  4. Develop a Comprehensive Technical Training and Data Collection Program for Structural Welders and Fitters: Technical Proposal

    DTIC Science & Technology

    2006-05-30

    implementation Final Report 4 TECHNICAL PLAN AND RESULTS Task 1: Initiate the Project Management System Two senior NGSS production management...1 Technical Plan and Results...Third the system is hosted on a handheld unit which provides the foremen with an efficient daily planning tool. The Pilot System which entails

  5. 2013 Technical Roundtable

    EPA Pesticide Factsheets

    On December 9, 2013, EPA reconvened the study’s Technical Roundtable. Subject-matter experts discussed the outcomes of the 2013 Technical Workshops, stakeholder engagement, and plans for draft assessment report.

  6. TSCA Work Plan Chemical Technical Supplement – Physicochemical Properties and Environmental Fate of the Brominated Phthalates Cluster (BPC) Chemicals

    EPA Pesticide Factsheets

    TSCA Work Plan Chemical Technical Supplement – Physicochemical Properties and Environmental Fate of the Brominated Phthalates Cluster (BPC) Chemicals -- Brominated Phthalates Cluster Flame Retardants.

  7. Virtual surgical planning and 3D printing in repeat calvarial vault reconstruction for craniosynostosis: technical note.

    PubMed

    LoPresti, Melissa; Daniels, Bradley; Buchanan, Edward P; Monson, Laura; Lam, Sandi

    2017-04-01

    Repeat surgery for restenosis after initial nonsyndromic craniosynostosis intervention is sometimes needed. Calvarial vault reconstruction through a healed surgical bed adds a level of intraoperative complexity and may benefit from preoperative and intraoperative definitions of biometric and aesthetic norms. Computer-assisted design and manufacturing using 3D imaging allows the precise formulation of operative plans in anticipation of surgical intervention. 3D printing turns virtual plans into anatomical replicas, templates, or customized implants by using a variety of materials. The authors present a technical note illustrating the use of this technology: a repeat calvarial vault reconstruction that was planned and executed using computer-assisted design and 3D printed intraoperative guides.

  8. Strategic Planning in a Government Organization: The Experience of the Technical Information Division at NRaD.

    ERIC Educational Resources Information Center

    Cathcart, Margaret E.

    1997-01-01

    Describes development of strategic objectives at the Research, Development, Test, and Evaluation Division of the Naval Command, Control and Ocean Surveillance Center (NRaD). Discusses its plan to achieve these objectives. States that the organization's responsibilities span the continuum of information using technical communication skills. Uses…

  9. Special report: workshop on 4D-treatment planning in actively scanned particle therapy--recommendations, technical challenges, and future research directions.

    PubMed

    Knopf, Antje; Bert, Christoph; Heath, Emily; Nill, Simeon; Kraus, Kim; Richter, Daniel; Hug, Eugen; Pedroni, Eros; Safai, Sairos; Albertini, Francesca; Zenklusen, Silvan; Boye, Dirk; Söhn, Matthias; Soukup, Martin; Sobotta, Benjamin; Lomax, Antony

    2010-09-01

    This article reports on a 4D-treatment planning workshop (4DTPW), held on 7-8 December 2009 at the Paul Scherrer Institut (PSI) in Villigen, Switzerland. The participants were all members of institutions actively involved in particle therapy delivery and research. The purpose of the 4DTPW was to discuss current approaches, challenges, and future research directions in 4D-treatment planning in the context of actively scanned particle radiotherapy. Key aspects were addressed in plenary sessions, in which leaders of the field summarized the state-of-the-art. Each plenary session was followed by an extensive discussion. As a result, this article presents a summary of recommendations for the treatment of mobile targets (intrafractional changes) with actively scanned particles and a list of requirements to elaborate and apply these guidelines clinically.

  10. 48 CFR 31.205-43 - Trade, business, technical, and professional activity costs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Trade, business, technical... Contracts With Commercial Organizations 31.205-43 Trade, business, technical, and professional activity costs. The following types of costs are allowable: (a) Memberships in trade, business, technical, and...

  11. Tool use in neurodegenerative diseases: Planning or technical reasoning?

    PubMed

    Baumard, Josselin; Lesourd, Mathieu; Remigereau, Chrystelle; Jarry, Christophe; Etcharry-Bouyx, Frédérique; Chauviré, Valérie; Osiurak, François; Le Gall, Didier

    2017-04-29

    Recent works showed that tool use can be impaired in stroke patients because of either planning or technical reasoning deficits, but these two hypotheses have not yet been compared in the field of neurodegenerative diseases. The aim of this study was to address the relationships between real tool use, mechanical problem-solving, and planning skills in patients with Alzheimer's disease (AD, n = 32), semantic dementia (SD, n = 16), and corticobasal syndrome (CBS, n = 9). Patients were asked to select and use ten common tools, to solve three mechanical problems, and to complete the Tower of London test. Motor function and episodic memory were controlled using the Purdue Pegboard Test and the BEC96 questionnaire, respectively. A data-transformation method was applied to avoid ceiling effects, and single-case analysis was performed based on raw scores and completion time. All groups demonstrated either impaired or slowed tool use. Planning deficits were found only in the AD group. Mechanical problem-solving deficits were observed only in the AD and CBS groups. Performance in the Tower of London test was the best predictor of tool use skills in the AD group, suggesting these patients had general rather than mechanical problem-solving deficits. Episodic memory seemed to play little role in performance. Motor dysfunction tended to be associated with tool use skills in CBS patients, while tool use disorders are interpreted as a consequence of the semantic loss in SD in line with previous works. These findings may encourage caregivers to set up disease-centred interventions. © 2017 The British Psychological Society.

  12. DoDEA Seniors' Postsecondary Plans and Scholarships, 2010

    ERIC Educational Resources Information Center

    Embler, Sandra

    2010-01-01

    During their senior year students in the Department of Defense Education Activity (DoDEA) schools develop a postsecondary plan. This plan outlines what students intend to do after graduating from high school; whether they are planning to attend a 4-year college/university, junior/community college, or vocational/technical school; seek employment…

  13. An Integrated Extravehicular Activity Research Plan

    NASA Technical Reports Server (NTRS)

    Abercromby, Andrew F. J.; Ross, Amy J.; Cupples, J. Scott

    2016-01-01

    Multiple organizations within NASA and outside of NASA fund and participate in research related to extravehicular activity (EVA). In October 2015, representatives of the EVA Office, the Crew and Thermal Systems Division (CTSD), and the Human Research Program (HRP) at NASA Johnson Space Center agreed on a formal framework to improve multi-year coordination and collaboration in EVA research. At the core of the framework is an Integrated EVA Research Plan and a process by which it will be annually reviewed and updated. The over-arching objective of the collaborative framework is to conduct multi-disciplinary cost-effective research that will enable humans to perform EVAs safely, effectively, comfortably, and efficiently, as needed to enable and enhance human space exploration missions. Research activities must be defined, prioritized, planned and executed to comprehensively address the right questions, avoid duplication, leverage other complementary activities where possible, and ultimately provide actionable evidence-based results in time to inform subsequent tests, developments and/or research activities. Representation of all appropriate stakeholders in the definition, prioritization, planning and execution of research activities is essential to accomplishing the over-arching objective. A formal review of the Integrated EVA Research Plan will be conducted annually. External peer review of all HRP EVA research activities including compilation and review of published literature in the EVA Evidence Book is already performed annually. Coordination with stakeholders outside of the EVA Office, CTSD, and HRP is already in effect on a study-by-study basis; closer coordination on multi-year planning with other EVA stakeholders including academia is being actively pursued. Details of the current Integrated EVA Research Plan are presented including description of ongoing and planned research activities in the areas of: Benchmarking; Anthropometry and Suit Fit; Sensors; Human

  14. Improvements in State and Local Planning for Mass Dispensing of Medical Countermeasures: The Technical Assistance Review Program, United States, 2007-2014.

    PubMed

    Renard, Paul G; Vagi, Sara J; Reinold, Chris M; Silverman, Brenda L; Avchen, Rachel N

    2017-09-01

    To evaluate and describe outcomes of state and local medical countermeasure preparedness planning, which is critical to ensure rapid distribution and dispensing of a broad spectrum of life-saving medical assets during a public health emergency. We used 2007 to 2014 state and local data collected from the Centers for Disease Control and Prevention's Technical Assistance Review. We calculated descriptive statistics from 50 states and 72 local Cities Readiness Initiative jurisdictions that participated in the Technical Assistance Review annually. From 2007 to 2014, the average overall Technical Assistance Review score increased by 13% for states and 41% for Cities Readiness Initiative jurisdictions. In 2014, nearly half of states achieved the maximum possible overall score (100), and 94% of local Cities Readiness Initiative jurisdictions achieved a score of 90 or more. Despite challenges, effective and timely medical countermeasure distribution and dispensing is possible with appropriate planning, staff, and resources. However, vigilance in training, exercising, and improving plans from lessons learned in a sustained, coordinated way is critical to ensure continued public health preparedness success.

  15. FY 1987 current fiscal year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less

  16. Quality-assurance and data management plan for groundwater activities by the U.S. Geological Survey in Kansas, 2014

    USGS Publications Warehouse

    Putnam, James E.; Hansen, Cristi V.

    2014-01-01

    As the Nation’s principle earth-science information agency, the U.S. Geological Survey (USGS) is depended on to collect data of the highest quality. This document is a quality-assurance plan for groundwater activities (GWQAP) of the Kansas Water Science Center. The purpose of this GWQAP is to establish a minimum set of guidelines and practices to be used by the Kansas Water Science Center to ensure quality in groundwater activities. Included within these practices are the assignment of responsibilities for implementing quality-assurance activities in the Kansas Water Science Center and establishment of review procedures needed to ensure the technical quality and reliability of the groundwater products. In addition, this GWQAP is intended to complement quality-assurance plans for surface-water and water-quality activities and similar plans for the Kansas Water Science Center and general project activities throughout the USGS. This document provides the framework for collecting, analyzing, and reporting groundwater data that are quality assured and quality controlled. This GWQAP presents policies directing the collection, processing, analysis, storage, review, and publication of groundwater data. In addition, policies related to organizational responsibilities, training, project planning, and safety are presented. These policies and practices pertain to all groundwater activities conducted by the Kansas Water Science Center, including data-collection programs, interpretive and research projects. This report also includes the data management plan that describes the progression of data management from data collection to archiving and publication.

  17. Local adaptation of the National Physical Activity Plan: creation of the Active Living Plan for a Healthier San Antonio.

    PubMed

    Esparza, Laura A; Velasquez, Katherine S; Zaharoff, Annette M

    2014-03-01

    Physical inactivity and related health consequences are serious public health threats. Effective strategies to facilitate and support active-living opportunities must be implemented at national, state, and local levels. San Antonio, Texas, health department officials launched the Active Living Council of San Antonio (ALCSA) to engage the community in developing a 3- to 5-year plan to promote active living. A steering committee set preliminary ALCSA aims and established a multisector membership structure modeled after the US National Physical Activity Plan (NPAP). ALCSA adopted governance standards, increased knowledge of physical activity and health, and engaged in an 18-month collaborative master plan writing process. ALCSA selected overarching strategies and evidence-based strategies for each societal sector and adapted strategies to the local context, including tactics, measures of success, and timelines. Community and expert engagement led to a localized plan reflecting national recommendations, the Active Living Plan for a Healthier San Antonio. Multisector collaborations among governmental agencies and community organizations, which were successfully developed in this case to produce the first-ever local adaptation of the NPAP, require clearly defined expectations. Lessons learned in ALCSA's organizational and plan development can serve as a model for future community-driven efforts to increase active living.

  18. From Physical Activity Guidelines to a National Activity Plan

    ERIC Educational Resources Information Center

    Bornstein, Daniel B.; Pate, Russell R.

    2014-01-01

    The U.S. National Physical Activity Plan (NPAP) is a comprehensive strategic plan aimed at increasing physical activity levels in all segments of the American population. The purpose of this paper is to summarize the development of the NPAP, provide an update on the status of the NPAP, and comment on the future of the NPAP. The NPAP was released…

  19. What contributes to action plan enactment? Examining characteristics of physical activity plans.

    PubMed

    Fleig, Lena; Gardner, Benjamin; Keller, Jan; Lippke, Sonia; Pomp, Sarah; Wiedemann, Amelie U

    2017-11-01

    Individuals with chronic conditions can benefit from formulating action plans to engage in regular physical activity. However, the content and the successful translation of plans into action, so-called plan enactment, are rarely adequately evaluated. The aim of this study was to describe the content of user-specified plans and to examine whether participants were more likely to enact their plans if these plans were highly specific, viable, and instrumental. The study presents secondary analyses from a larger behavioural intervention in cardiac and orthopaedic rehabilitation. The content of 619 action plans from 229 participants was evaluated by two independent raters (i.e., qualitative analyses and ratings of specificity) and by participants themselves (i.e., instrumentality and viability). Plan enactment was also measured via self-reports. Multilevel analyses examined the relationship between these plan characteristics and subsequent plan enactment, and between plan enactment and aggregated physical activity. Participants preferred to plan leisure-time physical activities anchored around time-based cues. Specificity of occasion cues (i.e., when to act) and highly instrumental plans were positively associated with plan enactment. Interestingly, individuals who planned less specific behavioural responses (i.e., what to do) were more likely to enact their plans. Plan enactment was positively associated with aggregated behaviour. Interventions should not only emphasize the importance of planning, but also the benefits of formulating specific contextual cues. Planning of the behavioural response seems to require less precision. Allowing for some flexibility in executing the anticipated target behaviour seems to aid successful plan enactment. Statement of Contribution What is already known on this subject? Action planning interventions are efficacious in promoting health behaviour. Characteristics of plan content (i.e., specificity) matter for unconditional behaviour

  20. Integrated Extravehicular Activity Human Research Plan: 2017

    NASA Technical Reports Server (NTRS)

    Abercromby, Andrew

    2017-01-01

    Multiple organizations within NASA as well as industry and academia fund and participate in research related to extravehicular activity (EVA). In October 2015, representatives of the EVA Office, the Crew and Thermal Systems Division (CTSD), and the Human Research Program (HRP) at NASA Johnson Space Center agreed on a formal framework to improve multi-year coordination and collaboration in EVA research. At the core of the framework is an Integrated EVA Human Research Plan and a process by which it will be annually reviewed and updated. The over-arching objective of the collaborative framework is to conduct multi-disciplinary cost-effective research that will enable humans to perform EVAs safely, effectively, comfortably, and efficiently, as needed to enable and enhance human space exploration missions. Research activities must be defined, prioritized, planned and executed to comprehensively address the right questions, avoid duplication, leverage other complementary activities where possible, and ultimately provide actionable evidence-based results in time to inform subsequent tests, developments and/or research activities. Representation of all appropriate stakeholders in the definition, prioritization, planning and execution of research activities is essential to accomplishing the over-arching objective. A formal review of the Integrated EVA Human Research Plan will be conducted annually. Coordination with stakeholders outside of the EVA Office, CTSD, and HRP is already in effect on a study-by-study basis; closer coordination on multi-year planning with other EVA stakeholders including academia is being actively pursued. Details of the preliminary Integrated EVA Human Research Plan are presented including description of ongoing and planned research activities in the areas of: physiological and performance capabilities; suit design parameters; EVA human health and performance modeling; EVA tasks and concepts of operations; EVA informatics; human-suit sensors; suit

  1. 25 CFR 1000.68 - May non-BIA bureaus provide technical assistance to a Tribe/Consortium in drafting its planning...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Financial Assistance for Planning and Negotiation Grants for Non-BIA Programs Eligibility and Application Process § 1000.68 May non-BIA bureaus provide technical assistance to a Tribe/Consortium in drafting its...

  2. 25 CFR 1000.68 - May non-BIA bureaus provide technical assistance to a Tribe/Consortium in drafting its planning...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Financial Assistance for Planning and Negotiation Grants for Non-BIA Programs Eligibility and Application Process § 1000.68 May non-BIA bureaus provide technical assistance to a Tribe/Consortium in drafting its...

  3. 25 CFR 1000.68 - May non-BIA bureaus provide technical assistance to a Tribe/Consortium in drafting its planning...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Financial Assistance for Planning and Negotiation Grants for Non-BIA Programs Eligibility and Application Process § 1000.68 May non-BIA bureaus provide technical assistance to a Tribe/Consortium in drafting its...

  4. 25 CFR 1000.68 - May non-BIA bureaus provide technical assistance to a Tribe/Consortium in drafting its planning...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Financial Assistance for Planning and Negotiation Grants for Non-BIA Programs Eligibility and Application Process § 1000.68 May non-BIA bureaus provide technical assistance to a Tribe/Consortium in drafting its...

  5. 76 FR 18649 - Technical Revisions to Actuarial Information on Form 5500 Annual Return/Report for Pension Plans...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-05

    ... DEPARTMENT OF LABOR Employee Benefits Security Administration 29 CFR Part 2520 Technical Revisions... Alternatives Under Pension Relief Act of 2010 AGENCY: Employee Benefits Security Administration, Labor. ACTION... 5500 Annual Return/Report of Employee Benefit Plan have been adopted in IRS Notice 2010-83 (2010-51 I.R...

  6. 24 CFR 572.205 - Planning grants-eligible activities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Planning grants-eligible activities... Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF... (HOPE 3) Grants § 572.205 Planning grants—eligible activities. Any planning grants made by HUD under the...

  7. Improvements in State and Local Planning for Mass Dispensing of Medical Countermeasures: The Technical Assistance Review Program, United States, 2007–2014

    PubMed Central

    Vagi, Sara J.; Reinold, Chris M.; Silverman, Brenda L.; Avchen, Rachel N.

    2017-01-01

    Objectives. To evaluate and describe outcomes of state and local medical countermeasure preparedness planning, which is critical to ensure rapid distribution and dispensing of a broad spectrum of life-saving medical assets during a public health emergency. Methods. We used 2007 to 2014 state and local data collected from the Centers for Disease Control and Prevention’s Technical Assistance Review. We calculated descriptive statistics from 50 states and 72 local Cities Readiness Initiative jurisdictions that participated in the Technical Assistance Review annually. Results. From 2007 to 2014, the average overall Technical Assistance Review score increased by 13% for states and 41% for Cities Readiness Initiative jurisdictions. In 2014, nearly half of states achieved the maximum possible overall score (100), and 94% of local Cities Readiness Initiative jurisdictions achieved a score of 90 or more. Conclusions. Despite challenges, effective and timely medical countermeasure distribution and dispensing is possible with appropriate planning, staff, and resources. However, vigilance in training, exercising, and improving plans from lessons learned in a sustained, coordinated way is critical to ensure continued public health preparedness success. PMID:28892441

  8. 78 FR 42821 - Agency Information Collection (Technical Industry Standards) Activities Under OMB Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-17

    ... (Technical Industry Standards) Activities Under OMB Review AGENCY: Office of Acquisition and Logistics... Affairs Acquisition Regulation (VAAR) Provision 852.211-72 (formerly 852.211-75), Technical Industry.... Abstract: VAAR provision 852.211-72, Technical Industry Standards, requires items offered for sale to VA...

  9. Reform of China's Technical and Vocational Education in the Transition from a Planned Economy System to a Socialist Market Economy System--A Case Study. Case Studies on Technical and Vocational Education in Asia and the Pacific.

    ERIC Educational Resources Information Center

    Yu, Zuguang; Zeng, Zida

    Since the early 1990s, China's government has followed a socialist market economy system. Accordingly, the technical and vocational education (TVE) should be restructured to meet its needs. Reform of the TVE system has four aspects. First, reform of the planning system includes a move from a central plan of enrollment to planning according to…

  10. Does service integration improve technical quality of care in low-resource settings? An evaluation of a model integrating HIV care into family planning services in Kenya

    PubMed Central

    Mutemwa, Richard; Mayhew, Susannah H; Warren, Charlotte E; Abuya, Timothy; Ndwiga, Charity; Kivunaga, Jackline

    2017-01-01

    Abstract The aim of this study was to investigate association between HIV and family planning integration and technical quality of care. The study focused on technical quality of client–provider consultation sessions. The cross-sectional study observed 366 client–provider consultation sessions and interviewed 37 health care providers in 12 public health facilities in Kenya. Multilevel random intercept and linear regression models were fitted to the matched data to investigate relationships between service integration and technical quality of care as well as associations between facility-level structural and provider factors and technical quality of care. A sensitivity analysis was performed to test for hidden bias. After adjusting for facility-level structural factors, HIV/family planning integration was found to have significant positive effect on technical quality of the consultation session, with average treatment effect 0.44 (95% CI: 0.63–0.82). Three of the 12 structural factors were significantly positively associated with technical quality of consultation session including: availability of family planning commodities (9.64; 95% CI: 5.07–14.21), adequate infrastructure (5.29; 95% CI: 2.89–7.69) and reagents (1.48; 95% CI: 1.02–1.93). Three of the nine provider factors were significantly positively associated with technical quality of consultation session: appropriate provider clinical knowledge (3.14; 95% CI: 1.92–4.36), job satisfaction (2.02; 95% CI: 1.21–2.83) and supervision (1.01; 95% CI: 0.35–1.68), while workload (−0.88; 95% CI: −1.75 to − 0.01) was negatively associated. Technical quality of the client–provider consultation session was also determined by duration of the consultation and type of clinic visit and appeared to depend on whether the clinic visit occurred early or later in the week. Integration of HIV care into family planning services can improve the technical quality of client–provider consultation sessions

  11. Does service integration improve technical quality of care in low-resource settings? An evaluation of a model integrating HIV care into family planning services in Kenya.

    PubMed

    Mutemwa, Richard; Mayhew, Susannah H; Warren, Charlotte E; Abuya, Timothy; Ndwiga, Charity; Kivunaga, Jackline

    2017-11-01

    The aim of this study was to investigate association between HIV and family planning integration and technical quality of care. The study focused on technical quality of client-provider consultation sessions. The cross-sectional study observed 366 client-provider consultation sessions and interviewed 37 health care providers in 12 public health facilities in Kenya. Multilevel random intercept and linear regression models were fitted to the matched data to investigate relationships between service integration and technical quality of care as well as associations between facility-level structural and provider factors and technical quality of care. A sensitivity analysis was performed to test for hidden bias. After adjusting for facility-level structural factors, HIV/family planning integration was found to have significant positive effect on technical quality of the consultation session, with average treatment effect 0.44 (95% CI: 0.63-0.82). Three of the 12 structural factors were significantly positively associated with technical quality of consultation session including: availability of family planning commodities (9.64; 95% CI: 5.07-14.21), adequate infrastructure (5.29; 95% CI: 2.89-7.69) and reagents (1.48; 95% CI: 1.02-1.93). Three of the nine provider factors were significantly positively associated with technical quality of consultation session: appropriate provider clinical knowledge (3.14; 95% CI: 1.92-4.36), job satisfaction (2.02; 95% CI: 1.21-2.83) and supervision (1.01; 95% CI: 0.35-1.68), while workload (-0.88; 95% CI: -1.75 to - 0.01) was negatively associated. Technical quality of the client-provider consultation session was also determined by duration of the consultation and type of clinic visit and appeared to depend on whether the clinic visit occurred early or later in the week. Integration of HIV care into family planning services can improve the technical quality of client-provider consultation sessions as measured by both health facility

  12. 7 CFR 3430.1007 - Planning activities.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... ADMINISTRATIVE PROVISIONS Sun Grant Program § 3430.1007 Planning activities. (a) Required plan. The Centers and... program. Proposals submitted to the Sun Grant Program must be sufficiently detailed and of high enough...

  13. 7 CFR 3430.1007 - Planning activities.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... ADMINISTRATIVE PROVISIONS Sun Grant Program § 3430.1007 Planning activities. (a) Required plan. The Centers and... program. Proposals submitted to the Sun Grant Program must be sufficiently detailed and of high enough...

  14. 7 CFR 3430.1007 - Planning activities.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... ADMINISTRATIVE PROVISIONS Sun Grant Program § 3430.1007 Planning activities. (a) Required plan. The Centers and... program. Proposals submitted to the Sun Grant Program must be sufficiently detailed and of high enough...

  15. 7 CFR 3430.1007 - Planning activities.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... ADMINISTRATIVE PROVISIONS Sun Grant Program § 3430.1007 Planning activities. (a) Required plan. The Centers and... program. Proposals submitted to the Sun Grant Program must be sufficiently detailed and of high enough...

  16. 75 FR 13209 - Proposed Information Collection (Technical Industry Standards) Activity: Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-18

    ... (Technical Industry Standards) Activity: Comment Request AGENCY: Office of Acquisition and Logistics... Industry Standards. OMB Control Number: 2900-0586. Type of Review: Extension of a currently approved collection. Abstract: VAAR provision 852.211-75, Technical Industry Standards, requires items offered for...

  17. Systematic Exploitation of Marginal Flexibility in Staff Planning.

    ERIC Educational Resources Information Center

    Lawaetz, Peter

    1984-01-01

    The Technical University of Denmark has tried to free resources in a stagnant or declining budget for development of new subject areas by planned contraction of ordinary activities, with only moderate success due to low mobility and strong specialization of the scientific staff. A more realistic planning system has been introduced, using…

  18. Responding to the World Health Organization Global Disability Action Plan in Egypt: A Technical Consultancy to develop a National Disability, Health and Rehabilitation Plan.

    PubMed

    Gutenbrunner, Christoph; Nugraha, Boya

    2018-04-18

    A technical consultation to develop a National Disability, Health and Rehabilitation Plan (NDHRP) for Egypt was carried out in 2015. Its overall goal was to improve health, functioning, well-being, quality of life, and participation of persons with disability in Egypt by supporting the Ministry of Health and Population and other stakeholders to improve access to health services and strengthen health-related rehabilitation services for all persons in need. The methodological steps of the technical consultation were as follows: collecting and reviewing accessible documents and data; site visits to state institutions, health and rehabilitation services; discussions with relevant stakeholders in rehabilitation, including persons with disability; drafting recommendations based on the principles of the World Report on Disability and the World Health Organization Global Disability Action Plan and the information collected; discussion with stakeholders in a workshop; and preparation of a final report. The development of a NDHRP was successful and led to recommendations with a good level of consensus among stakeholders in Egypt. The authors hope that the NDHRP will lead to improved rehabilitation service provision, and health and quality of life of persons with disability and chronic health conditions living in Egypt.

  19. Activity Scratchpad Prototype: Simplifying the Rover Activity Planning Cycle

    NASA Technical Reports Server (NTRS)

    Abramyan, Lucy

    2005-01-01

    The Mars Exploration Rover mission depends on the Science Activity Planner as its primary interface to the Spirit and Opportunity Rovers. Scientists alternate between a series of mouse clicks and keyboard inputs to create a set of instructions for the rovers. To accelerate planning by minimizing mouse usage, a rover planning editor should receive the majority of inputted commands from the keyboard. Thorough investigation of the Eclipse platform's Java editor has provided the understanding of the base model for the Activity Scratchpad. Desirable Eclipse features can be mapped to specific rover planning commands, such as auto-completion for activity titles and content assist for target names. A custom editor imitating the Java editor's features was created with an XML parser for experimenting purposes. The prototype editor minimized effort for redundant tasks and significantly improved the visual representation of XML syntax by highlighting keywords, coloring rules, folding projections, and providing hover assist, templates and an outline view of the code.

  20. A Plan of Organization, Administration, and Elements of Finance for Vocational-Technical Adult Education, Birmingham City School System.

    ERIC Educational Resources Information Center

    Shelton, John Alton

    Designed to help formulate a plan of organization and administration for vocational and technical education and adult education in the Birmingham, Alabama, city schools, this study entailed an extensive literature review on vocational education and administrative matters; a historical review of several Birmingham schools (Paul Hayne School,…

  1. 48 CFR 2131.205-43 - Trade, business, technical and professional activity costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Trade, business, technical... Organizations 2131.205-43 Trade, business, technical and professional activity costs. (a) FEGLI Program contractors shall seek the advance written approval of the contracting officer for allowability of all or part...

  2. Acquisition of background and technical information and class trip planning

    NASA Technical Reports Server (NTRS)

    Mackinnon, R. M.; Wake, W. H.

    1981-01-01

    Instructors who are very familiar with a study area, as well as those who are not, find the field trip information acquisition and planning process speeded and made more effective by organizing it in stages. The stage follow a deductive progression: from the associated context region, to the study area, to the specific sample window sites, and from generalized background information on the study region to specific technical data on the environmental and human use systems to be interpreted at each site. On the class trip and in the follow up laboratory, the learning/interpretive process are at first deductive in applying previously learned information and skills to analysis of the study site, then inductive in reading and interpreting the landscape, imagery, and maps of the site, correlating them with information of other samples sites and building valid generalizations about the larger study area, its context region, and other (similar and/or contrasting) regions.

  3. Environmental Measurements Laboratory fiscal year 1998: Accomplishments and technical activities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Erickson, M.D.

    1999-01-01

    The Environmental Measurements Laboratory (EML) is government-owned, government-operated, and programmatically under the DOE Office of Environmental Management. The Laboratory is administered by the Chicago Operations Office. EML provides program management, technical assistance and data quality assurance for measurements of radiation and radioactivity relating to environmental restoration, global nuclear nonproliferation, and other priority issues for the Department of Energy, as well as for other government, national, and international organizations. This report presents the technical activities and accomplishments of EML for Fiscal Year 1998.

  4. Technical Excellence: A Requirement for Good Engineering

    NASA Technical Reports Server (NTRS)

    Gill, Paul S.; Vaughan, William W.

    2008-01-01

    Technical excellence is a requirement for good engineering. Technical excellence has many different ways of expressing itself within engineering. NASA has initiatives that address the enhancement of the Agency's technical excellence and thrust to maintain the associated high level of performance by the Agency on current programs/projects and as it moves into the Constellation Program and the return to the Moon with plans to visit Mars. This paper addresses some of the key initiatives associated with NASA's technical excellence thrust. Examples are provided to illustrate some results being achieved and plans to enhance these initiatives.

  5. 34 CFR 300.119 - Technical assistance and training activities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... EDUCATION OF CHILDREN WITH DISABILITIES State Eligibility Least Restrictive Environment (lre) § 300.119... 34 Education 2 2011-07-01 2010-07-01 true Technical assistance and training activities. 300.119 Section 300.119 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF...

  6. Translating Technical Support Into Country Action: The Role of the Interagency Task Team on the Prevention and Treatment of HIV Infection in Pregnant Women, Mothers, and Children in the Global Plan Era.

    PubMed

    Luo, Chewe; Hirnschall, Gottfried; Rodrigues, Jessica; Romano, Sostena; Essajee, Shaffiq; Rogers, Braeden; McCarthy, Elizabeth; Mwango, Albert; Sangrujee, Nalinee; Adler, Michelle R; Houston, James C; Langa, Judite O; Urso, Marilena; Bolu, Omotayo; Tene, Gilbert; Elat Nfetam, Jean B; Kembou, Etienne; Phelps, Benjamin R

    2017-05-01

    While the Interagency Task Team on the Prevention and Treatment of HIV Infection in Pregnant Women, Mothers, and Children (IATT) partnership existed before the Global Plan Towards the Elimination of New HIV Infections Among Children by 2015 and Keeping Their Mothers Alive (Global Plan), its reconfiguration was critical to coordinating provision of technical assistance that positively influenced country decision-making and program performance. This article describes how the Global Plan anchored the work of the IATT and, in turn, how the IATT's technical assistance helped to accelerate achievement of the Global Plan targets and milestones. The technical assistance that will be discussed addressed a broad range of priority actions and milestones described in the Global Plan: (1) planning for and implementing Option B+; (2) strengthening monitoring and evaluation systems; (3) translating evidence into action and advocacy; and (4) promoting community engagement. This article also reviews the ongoing challenges and opportunities of providing technical assistance in a rapidly evolving environment that calls for ever more flexible and contextualized responses. The effectiveness of technical assistance facilitated by the IATT was defined by its timeliness, evidence base, and unique global perspective that built on the competencies of its partners and promoted synergies across program areas. Reaching the final goal of eliminating vertical transmission of HIV infection and achieving an AIDS-free generation in countries with the highest HIV burden requires that the IATT partnership and technical assistance remain responsive to country-specific needs while aligning with the current programmatic reality and new global goals such as the Sustainable Development Goals and 90-90-90 targets.

  7. Vision for the Year 2002: A Working Document. Salem County Board for Vocational Education Strategic Plan for the Salem County Vocational Technical Schools.

    ERIC Educational Resources Information Center

    Salem County Board for Vocational Education, Woodstown, NJ.

    A strategic plan for vocational-technical education (VTE) in Salem County, New Jersey, in the year 2002 was developed by the county board of VTE and county advisory board with input from students, parents, employers, elected officials, and the community in general. Six strategic planning subcommittees were formed to review the district's VTE…

  8. 75 FR 28857 - Agency Information Collection (Technical Industry Standards) Activities Under OMB Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-24

    ... (Technical Industry Standards) Activities Under OMB Review AGENCY: Office of Acquisition and Logistics... Industry Standards. OMB Control Number: 2900-0586. Type of Review: Extension of a currently approved collection. Abstract: VAAR provision 852.211-75, Technical Industry Standards, requires that items offered...

  9. Creating a bridge between data collection and program planning: a technical assistance model to maximize the use of HIV/AIDS surveillance and service utilization data for planning purposes.

    PubMed

    Logan, Jennifer A; Beatty, Maile; Woliver, Renee; Rubinstein, Eric P; Averbach, Abigail R

    2005-12-01

    Over time, improvements in HIV/AIDS surveillance and service utilization data have increased their usefulness for planning programs, targeting resources, and otherwise informing HIV/AIDS policy. However, community planning groups, service providers, and health department staff often have difficulty in interpreting and applying the wide array of data now available. We describe the development of the Bridging Model, a technical assistance model for overcoming barriers to the use of data for program planning. Through the use of an iterative feedback loop in the model, HIV/AIDS data products constantly are evolving to better inform the decision-making tasks of their multiple users. Implementation of this model has led to improved data quality and data products and to a greater willingness and ability among stakeholders to use the data for planning purposes.

  10. Quality-assurance plan and field methods for quality-of-water activities, U.S. Geological Survey, Idaho National Engineering Laboratory, Idaho

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mann, L.J.

    1996-10-01

    Water-quality activities at the Idaho National Engineering Laboratory (INEL) Project Office are part of the US Geological Survey`s (USGS) Water Resources Division (WRD) mission of appraising the quantity and quality of the Nation`s water resources. The purpose of the Quality Assurance Plan (QAP) for water-quality activities performed by the INEL Project Office is to maintain and improve the quality of technical products, and to provide a formal standardization, documentation, and review of the activities that lead to these products. The principles of this plan are as follows: (1) water-quality programs will be planned in a competent manner and activities willmore » be monitored for compliance with stated objectives and approaches; (2) field, laboratory, and office activities will be performed in a conscientious and professional manner in accordance with specified WRD practices and procedures by qualified and experienced employees who are well trained and supervised, if or when, WRD practices and procedures are inadequate, data will be collected in a manner that its quality will be documented; (3) all water-quality activities will be reviewed for completeness, reliability, credibility, and conformance to specified standards and guidelines; (4) a record of actions will be kept to document the activity and the assigned responsibility; (5) remedial action will be taken to correct activities that are deficient.« less

  11. Gender Planning and Vocational Education, and Technical Training in Palestine: An Initial Framework. Gender and Society Working Paper #4.

    ERIC Educational Resources Information Center

    Nahleh, Lamis Abu

    Gender planning and vocational education and technical training (VETT) in Palestine were examined through the following: review of available literature and policy-oriented reports, discussions with educators in the field, and roundtable discussion in which representatives of the Palestinian Ministry of Education and Ministry of Labor and experts…

  12. 10 CFR 905.40 - Technical assistance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Technical assistance. 905.40 Section 905.40 Energy DEPARTMENT OF ENERGY ENERGY PLANNING AND MANAGEMENT PROGRAM Energy Services § 905.40 Technical assistance. Western shall establish a program that provides technical assistance to customers to conduct integrated...

  13. The Effect of Person Centered Planning Activities on the IEP/Transition Planning Process.

    ERIC Educational Resources Information Center

    Miner, Craig A.; Bates, Paul E.

    1997-01-01

    A study of 22 students with mental retardation and their families evaluated the impact of person-centered planning activities on several variables related to a student's individual education program/transition planning meeting. Person-centered planning had a significant effect on parent participation in meetings, but not on discussion of…

  14. Predictors of employer satisfaction: technical and non-technical skills.

    PubMed

    Danielson, Jared A; Wu, Tsui-Feng; Fales-Williams, Amanda J; Kirk, Ryan A; Preast, Vanessa A

    2012-01-01

    Employers of 2007-2009 graduates from Iowa State University College of Veterinary Medicine were asked to respond to a survey regarding their overall satisfaction with their new employees as well as their new employees' preparation in several technical and non-technical skill areas. Seventy-five responses contained complete data and were used in the analysis. Four technical skill areas (data collection, data interpretation, planning, and taking action) and five non-technical skill areas (interpersonal skills, ability to deal with legal issues, business skills, making referrals, and problem solving) were identified. All of the skill area subscales listed above had appropriate reliability (Cronbach's alpha>0.70) and were positively and significantly correlated with overall employer satisfaction. Results of two simultaneous regression analyses indicated that of the four technical skill areas, taking action is the most salient predictor of employer satisfaction. Of the five non-technical skill areas, interpersonal skills, business skills, making referrals, and problem solving were the most important skills in predicting employer satisfaction. Hierarchical regression analysis revealed that all technical skills explained 25% of the variation in employer satisfaction; non-technical skills explained an additional 42% of the variation in employer satisfaction.

  15. Tank waste remediation system configuration management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vann, J.M.

    The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Projectmore » personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents.« less

  16. Planning and Implementing Technical Services Workstations.

    ERIC Educational Resources Information Center

    Kaplan, Michael, Ed.

    The job of the library cataloger has grown increasingly complex. Catalogers must draw from a vast pool of dynamic information as they handle traditional and new forms of media. Technical Services Workstations (TSWs) provide catalogers the network data, application programs, and standard hardware required to catalog all types of media quickly and…

  17. Lawrence Berkeley Laboratory Institutional Plan, FY 1993--1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-10-01

    The FY 1993--1998 Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. The Strategic Plan section identifies long-range conditions that can influence the Laboratory, potential research trends, and several management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describesmore » the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation's scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff composition and development programs. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The Resource Projections are estimates of required budgetary authority for the Laboratory's ongoing research programs. The plan is an institutional management report for integration with the Department of Energy's strategic planning activities that is developed through an annual planning process. The plan identifies technical and administrative directions in the context of the National Energy Strategy and the Department of Energy's program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Development from information contributed by the Laboratory's scientific and support divisions.« less

  18. Lawrence Berkeley Laboratory Institutional Plan, FY 1993--1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chew, Joseph T.; Stroh, Suzanne C.; Maio, Linda R.

    1992-10-01

    The FY 1993--1998 Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. The Strategic Plan section identifies long-range conditions that can influence the Laboratory, potential research trends, and several management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describesmore » the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation`s scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff composition and development programs. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The plan is an institutional management report for integration with the Department of Energy`s strategic planning activities that is developed through an annual planning process. The plan identifies technical and administrative directions in the context of the National Energy Strategy and the Department of Energy`s program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Development from information contributed by the Laboratory`s scientific and support divisions.« less

  19. 32 CFR 644.8 - Planning and scheduling real estate activities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 4 2012-07-01 2011-07-01 true Planning and scheduling real estate activities... (CONTINUED) REAL PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.8 Planning and scheduling real estate activities. (a) Normal scheduling. (1) The objective of a planned program is to provide for...

  20. 32 CFR 644.8 - Planning and scheduling real estate activities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 4 2013-07-01 2013-07-01 false Planning and scheduling real estate activities... (CONTINUED) REAL PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.8 Planning and scheduling real estate activities. (a) Normal scheduling. (1) The objective of a planned program is to provide for...

  1. 32 CFR 644.8 - Planning and scheduling real estate activities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 4 2014-07-01 2013-07-01 true Planning and scheduling real estate activities... (CONTINUED) REAL PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.8 Planning and scheduling real estate activities. (a) Normal scheduling. (1) The objective of a planned program is to provide for...

  2. Predicting Changes in Physical Activity among Adolescents: The Role of Self-Efficacy, Intention, Action Planning and Coping Planning

    ERIC Educational Resources Information Center

    Araujo-Soares, Vera; McIntyre, Teresa; Sniehotta, Falko F.

    2009-01-01

    This paper aims to test the direct predictors of the theory of planned behaviour (TPB), action planning and coping planning as predictors of changes in physical activity (PA) in 157 adolescents (mean age: 12). TPB measures, the Action Planning and Coping Planning Scales (APCPS) and the International Physical Activity Questionnaires were measured…

  3. Technical and Occupational Shops.

    ERIC Educational Resources Information Center

    Ontario Dept. of Education, Toronto. School Planning and Building Research Section.

    This booklet presents suggested plans and specifications for and discusses facilities common to technical and occupational shops. Drawings, room plans, and text illustrate specifications for drafting rooms, a welding shop, an automechanics shop, an auto body shop, and a high school greenhouse. Also included are facility designs for agricultural…

  4. Vocational-Technical Education: A Plan for Monroe County, Florida.

    ERIC Educational Resources Information Center

    Mills, Hugh L., Sr., Ed.; Pilcher, Palmer, C., Ed.

    Suggested vocational-technical education programs for the Monroe County Florida school system are presented along with recommendations to implement the principle of coordinated career education in the public schools. Expansion of vocational-technical programs is emphasized to expose all students from kindergarten through Grade 12 to career…

  5. Lesson Plans: Road Maps for the Active Learning Classroom.

    PubMed

    Moore-Cox, Annie

    2017-11-01

    Lesson planning is a documentation process used extensively in education from kindergarten through 12th grade, but rarely in higher education, including undergraduate, prelicensure nursing education. Lesson plans help teachers plan what will happen during a class period from moment to moment. Trends in nursing education, such as the incorporation of active learning strategies in the classroom, make lesson plans a timely addition to the nurse educator's toolkit. This article describes the components of a lesson plan and offers an author-developed template for use in nursing education. Using the template helps nurse educators map out activities for all class participants, such as students, student pairs and teams, and faculty. The lesson plan enables faculty to plot out the many dynamic components of an active learning class period. It also serves as a road map for subsequent faculty, which is an important feature as the profession faces a wave of retirements in the coming decade. [J Nurs Educ. 2017;56(11):697-700.]. Copyright 2017, SLACK Incorporated.

  6. INDEPENDENT REVIEW OF THE X-701B GROUNDWATER REMEDY, PORTSMOUTH, OHIO: TECHNICAL EVALUATION AND RECOMMENDATIONS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Looney, B.; Eddy-Dilek, C.; Costanza, J.

    2008-12-15

    The Department of Energy Portsmouth Paducah Project Office requested assistance from Department of Energy Office of Environmental Management (EM-22) to provide independent technical experts to evaluate past and ongoing remedial activities at the Portsmouth facility that were completed to address TCE contamination associated with the X-701B groundwater plume and to make recommendations for future efforts. The Independent Technical Review team was provided with a detailed and specific charter. The charter requested that the technical team first review the past and current activities completed for the X-701B groundwater remedy for trichloroethene (TCE) in accordance with a Decision Document that was issuedmore » by Ohio EPA on December 8, 2003 and a Work Plan that was approved by Ohio EPA on September 22, 2006. The remedy for X-701B divides the activities into four phases: Phase I - Initial Source Area Treatment, Phase II - Expanded Source Area Treatment, Phase III - Evaluation and Reporting, and Phase IV - Downgradient Remediation and Confirmation of Source Area Treatment. Phase I of the remedy was completed during FY2006, and DOE has now completed six oxidant injection events within Phase II. The Independent Technical Review team was asked to evaluate Phase II activities, including soil and groundwater results, and to determine whether or not the criteria that were defined in the Work Plan for the Phase II end point had been met. The following criteria are defined in the Work Plan as an acceptable Phase II end point: (1) Groundwater samples from the identified source area monitoring wells have concentrations below the Preliminary Remediation Goal (PRG) for TCE in groundwater, or (2) The remedy is no longer effective in removing TCE mass from the source area. In addition, the charter specifies that if the Review Team determines that the Phase II endpoint has not been reached, then the team should address the following issues: (1) If additional injection events are

  7. MAPGEN: Mixed-Initiative Activity Planning for the Mars Exploration Rover Mission

    NASA Technical Reports Server (NTRS)

    Ai-Chang, Mitchell; Bresina, John; Hsu, Jennifer; Jonsson, Ari; Kanefsky, Bob; McCurdy, Michael; Morris, Paul; Rajan, Kanna; Vera, Alonso; Yglesias, Jeffrey

    2004-01-01

    This document describes the Mixed initiative Activity Plan Generation system MAPGEN. This system is one of the critical tools in the Mars Exploration Rover mission surface operations, where it is used to build activity plans for each of the rovers, each Martian day. The MAPGEN system combines an existing tool for activity plan editing and resource modeling, with an advanced constraint-based reasoning and planning framework. The constraint-based planning component provides active constraint and rule enforcement, automated planning capabilities, and a variety of tools and functions that are useful for building activity plans in an interactive fashion. In this demonstration, we will show the capabilities of the system and demonstrate how the system has been used in actual Mars rover operations. In contrast to the demonstration given at ICAPS 03, significant improvement have been made to the system. These include various additional capabilities that are based on automated reasoning and planning techniques, as well as a new Constraint Editor support tool. The Constraint Editor (CE) as part of the process for generating these command loads, the MAPGEN tool provides engineers and scientists an intelligent activity planning tool that allows them to more effectively generate complex plans that maximize the science return each day. The key to the effectiveness of the MAPGEN tool is an underlying constraint-based planning and reasoning engine.

  8. Can persuasive messages encourage individuals to create action plans for physical activity?

    PubMed

    Sweet, Shane N; Brawley, Lawrence R; Hatchell, Alexandra; Gainforth, Heather L; Latimer-Cheung, Amy E

    2014-08-01

    Given the positive influence of action planning on physical activity, persuasive messages could be designed to promote action planning. The purpose of this paper was to test action planning messages in two studies. Participants were allocated to one of two message groups, reading either a physical activity only or physical activity plus action planning message (Study 1) and either a gain-framed or loss-framed action planning message (Study 2). The percent of individuals who created an action plan and the quality of the plans were evaluated. In Study 1, individuals in the physical activity plus action planning group created as many action plans as the physical activity only group, but their plans were higher quality. In Study 2, Week 2 differences between the gain- and loss-framed message groups were found for action planning. To our knowledge, these studies were the first to investigate message-induced action planning as a behavior. More research is needed to optimize these messages.

  9. 23 CFR 450.208 - Coordination of planning process activities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... planning carried out under this subpart with statewide trade and economic development planning activities... CFR part 500. (e) States may apply asset management principles and techniques in establishing planning...

  10. Technical Evaluation Motor No. 7 (TEM-07)

    NASA Technical Reports Server (NTRS)

    Hugh, Phil

    1991-01-01

    Technical Evaluation Motor Number 7 (TEM-7) was a full scale, full-duration static test firing of a high performance motor (HPM) configuration solid rocket motor (SRM) with nozzle vectoring. The static test fire occurred on 11 December 1990 at the Thiokol Corporation Static Test Bay T-97. Documented here are the procedures, performance, and results available through 22 January 1991. Critical post test hardware activities and assessment of the test data are not complete. A completed test report will be submitted 60 days after the test date. Included here is a presentation and discussion of the TEM-7 performance, anomalies, and test result concurrence with the objectives outlined in CTP-0107 Revision A, Space Shuttle Technical Evaluation Motor number 7 (TEM-07) Static Fire Test Plan.

  11. Defense Technical Information Center (DTIC) - Its role in the USAF Scientific and Technical Information Program

    NASA Technical Reports Server (NTRS)

    Kuhn, Allan D.

    1991-01-01

    The Defense Technical Information Center (DTIC), the central repository for DOD scientific and technical information concerning studies and research and engineering efforts, is discussed. The present makeup of DTIC is described and its functions in producing technical reports and technical report bibliographies are examined. DTIC's outreach services are reviewed, as are its DTIC information and technology transfer programs. DTIC's plans for the year 2000 and its relation to the mission of the U.S. Air Force, including the Air Force's STINFO program, are addressed.

  12. Association of Physical and Technical Activities With Partial Match Status in a Soccer Professional Team.

    PubMed

    Moalla, Wassim; Fessi, Mohamed Saieffedin; Makni, Emna; Dellal, Alexandre; Filetti, Cristoforo; Di Salvo, Valter; Chamari, Karim

    2018-06-01

    Moalla, W, Fessi, MS, Makni, E, Dellal, A, Filetti, C, Di Salvo, V, and Chamari, K. Association of physical and technical activities with partial match status in a soccer professional team. J Strength Cond Res 32(6): 1708-1714, 2018-The purpose of this study was to examine the association between physical and technical activities and partial match status (winning, drawing, or losing) in a professional soccer team over 2 seasons. Physical and technical activities of 52 official matches were collected and analyzed at each 15-minute interval, for each half (45 minutes), and full match (90 minutes) using a multiple-camera computerized tracking system. The results indicated that according to full match outcome: winning status was characterized by players covering more total distance (p ≤ 0.05) and low-intensity running (<14.4 km·h) (p ≤ 0.05), whereas, losing status induced more sprinting (≥25.2 km·h) (p < 0.01) and high-intensity running (≥19.8 km·h) (p ≤ 0.05). However, according to partial match status (i.e., 15 minutes and half time), players covered more distance for all running intensities while winning (p < 0.01). Technical match performance scores were not influenced by match status. In conclusion, the present study showed that the physical activities including high-intensity running and total distance covered were related to the match status, whereas technical activities were not. The overall outcome shows that higher physical activity was associated with winning partial match periods. This approach highlights the importance of physical fitness in soccer and may help coaches to better modulate players' roles and team tactical organization throughout the match.

  13. [Personal Futures Planning: Building a Foundation for Individualized Transition Services.

    ERIC Educational Resources Information Center

    Carr, Theresa, Ed.

    1993-01-01

    These two newsletter special issues focus on personal futures planning (PFP) for people with deaf blindness, with emphasis on technical assistance activities involved in implementing a PFP program. PFP guides a team through three phases of activities: (1) developing a "circle of support" for an individual with deaf blindness; (2)…

  14. The road plan model: Information model for planning road building activities

    NASA Technical Reports Server (NTRS)

    Azinhal, Rafaela K.; Moura-Pires, Fernando

    1994-01-01

    The general building contractor is presented with an information model as an approach for deriving a high-level work plan of construction activities applied to road building. Road construction activities are represented in a Road Plan Model (RPM), which is modeled in the ISO standard STEP/EXPRESS and adopts various concepts from the GARM notation. The integration with the preceding road design stage and the succeeding phase of resource scheduling is discussed within the framework of a Road Construction Model. Construction knowledge is applied to the road design and the terrain model of the surrounding road infrastructure for the instantiation of the RPM. Issues regarding the implementation of a road planner application supporting the RPM are discussed.

  15. Payload crew activity planning integration. Task 2: Inflight operations and training for payloads

    NASA Technical Reports Server (NTRS)

    Hitz, F. R.

    1976-01-01

    The primary objectives of the Payload Crew Activity Planning Integration task were to: (1) Determine feasible, cost-effective payload crew activity planning integration methods. (2) Develop an implementation plan and guidelines for payload crew activity plan (CAP) integration between the JSC Orbiter planners and the Payload Centers. Subtask objectives and study activities were defined as: (1) Determine Crew Activity Planning Interfaces. (2) Determine Crew Activity Plan Type and Content. (3) Evaluate Automated Scheduling Tools. (4) Develop a draft Implementation Plan for Crew Activity Planning Integration. The basic guidelines were to develop a plan applicable to the Shuttle operations timeframe, utilize existing center resources and expertise as much as possible, and minimize unnecessary data exchange not directly productive in the development of the end-product timelines.

  16. All health is local: state and local planning for physical activity promotion.

    PubMed

    Kohl, Harold W; Satinsky, Sara B; Whitfield, Geoffrey P; Evenson, Kelly R

    2013-01-01

    Physical activity is a leading cause of death in the world. Although state and local public health planning is a useful strategy to address noncommunicable disease health concerns such as heart disease, diabetes, cancer, and obesity, physical activity frequently is subsumed in such disease-centric planning efforts. This strategy could dilute broader efforts to promote physical activity, create administrative silos that may be trying to accomplish similar goals, and weaken efforts to more collectively address a variety of noncommunicable diseases. Currently, few stand-alone state plans directed specifically at physical activity exist. The reasons and barriers for this situation are not understood. In 2011, we surveyed public health care practitioners to describe state and local efforts for physical activity planning. Cross-sectional study. Survey of physical activity practitioners in the United States. A total of 227 former or current members of the US National Society of Physical Activity Practitioners in Public Health who completed a survey. Overall, 48.0% of respondents indicated that they were aware of public health plans for physical activity promotion in their state, whereas 36.6% indicated that they did not know. Respondents at the state level more frequently reported awareness of a plan (62.1%) than those with local-level (52.4%) or other job responsibilities (36.0%). A greater proportion of respondents reported that stand-alone physical activity plans existed in their state than actually did exist in the respective states. Integration with the National Physical Activity Plan was least often identified as a moderately or extremely relevant aspect of a state-level physical activity plan, although it was chosen at a high percentage (75.7%). Respondents identified financial support (88.0%) and political will and support (54.6%) most frequently as very or somewhat difficult barriers to moving forward with state-level physical activity plans. These data suggest

  17. Specification of Training Simulator Fidelity: A Research Plan. Technical Report 558.

    ERIC Educational Resources Information Center

    Baum, David R.; And Others

    This report presents a research plan to guide the determination of the empirical relationship between level of maintenance training simulator fidelity and training effectiveness. Chapter I describes data collection and analysis activities undertaken to provide guidance for fidelity decision making by the training simulator development community.…

  18. 77 FR 40634 - Solicitation for a Cooperative Agreement: Pretrial Technical Assistance for Evidence-Based...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-10

    ...: Pretrial Technical Assistance for Evidence-Based Decision Making in Local Criminal Justice Systems AGENCY... NIC initiative, Evidence-Based Decision Making (EBDM) in Local Criminal Justice Systems. Work under... individual system planning activities. These change strategies are critical to meeting their system's harm...

  19. Planning activity for internally generated reward goals in monkey amygdala neurons

    PubMed Central

    Schultz, Wolfram

    2015-01-01

    The best rewards are often distant and can only be achieved by planning and decision-making over several steps. We designed a multi-step choice task in which monkeys followed internal plans to save rewards towards self-defined goals. During this self-controlled behavior, amygdala neurons showed future-oriented activity that reflected the animal’s plan to obtain specific rewards several trials ahead. This prospective activity encoded crucial components of the animal’s plan, including value and length of the planned choice sequence. It began on initial trials when a plan would be formed, reappeared step-by-step until reward receipt, and readily updated with a new sequence. It predicted performance, including errors, and typically disappeared during instructed behavior. Such prospective activity could underlie the formation and pursuit of internal plans characteristic for goal-directed behavior. The existence of neuronal planning activity in the amygdala suggests an important role for this structure in guiding behavior towards internally generated, distant goals. PMID:25622146

  20. The Consolidated Human Activity Database — Master Version (CHAD-Master) Technical Memorandum

    EPA Pesticide Factsheets

    This technical memorandum contains information about the Consolidated Human Activity Database -- Master version, including CHAD contents, inventory of variables: Questionnaire files and Event files, CHAD codes, and references.

  1. Convergence Properties of a Class of Probabilistic Adaptive Schemes Called Sequential Reproductive Plans. Psychology and Education Series, Technical Report No. 210.

    ERIC Educational Resources Information Center

    Martin, Nancy

    Presented is a technical report concerning the use of a mathematical model describing certain aspects of the duplication and selection processes in natural genetic adaptation. This reproductive plan/model occurs in artificial genetics (the use of ideas from genetics to develop general problem solving techniques for computers). The reproductive…

  2. Transforming South-South technical support to fight noncommunicable diseases.

    PubMed

    Shakow, Aaron D A; Bukhman, Gene; Adebona, Olumuyiwa; Greene, Jeremy; de Dieu Ngirabega, Jean; Binagwaho, Agnès

    2012-03-01

    At the UN High-Level Meeting on non-communicable diseases (NCD) in September 2011, each member state was challenged to create a multisectoral national policy and plan for the prevention and control of non-communicable disease by 2013. Few low-income countries, however, currently have such plans. Their governments are likely to turn for assistance in drafting and implementation to multilateral agencies and Contract Technical Support Organizations recommended by development partners. Yet because many NCD seen in the lowest-income countries differ significantly from those prevalent elsewhere, existing providers of external technical support may lack the necessary experience to support strategic planning for NCD interventions in these settings. This article reviews currently available mechanisms of technical support for health sector planning. It places them in the broader historical context of post- World War II international development assistance and the more recent campaigns for horizontal "South-South" cooperation and aid effectiveness. It proposes bilateral technical assistance by low income-countries themselves as the natural evolution of development assistance in health. Such programs, it argues, may be able to improve the quality of technical support to low-income countries for strategic planning in the NCD area while directing resources to the regions where they are most needed. Copyright © 2012 World Heart Federation (Geneva). Published by Elsevier B.V. All rights reserved.

  3. ActiveWV: a systematic approach to developing a physical activity plan for West Virginia.

    PubMed

    Elliott, Eloise; Jones, Emily; Bulger, Sean

    2014-03-01

    Modeled after the National Physical Activity Plan (NPAP), ActiveWV 2015: The West Virginia Physical Activity Plan was developed to provide strategic direction for physical activity promotion within the state. The purpose of this manuscript is to describe the systematic approach taken in developing ActiveWV. Plan development began with establishing capacity and leadership among key stakeholders representing all societal sectors. A multiphase, statewide decision-making process allowed for input across sectors and geographic regions. The process results identified five priority areas that served as the conceptual framework for ActiveWV. Sector teams, comprised of key organization stakeholders across the eight sectors, finalized the sector-specific strategies and tactics using the NPAP evidence-based recommendations, results from a formalized strategic process, and the teams' expertise and experience. ActiveWV was officially released on January 19, 2012 at the State Capitol in Charleston, West Virginia. Community events throughout the state surrounded the release and celebrated West Virginia Physical Activity Day. Ongoing implementation and dissemination efforts are underway at state and local levels. As the NPAP calls for states and communities to develop plans that meet the needs of their particular context, other states may find the lessons learned from West Virginia helpful in the development process.

  4. 24 CFR 598.400 - HUD grants for planning activities.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 3 2012-04-01 2012-04-01 false HUD grants for planning activities. 598.400 Section 598.400 Housing and Urban Development Regulations Relating to Housing and Urban... DESIGNATIONS Post-Designation Requirements § 598.400 HUD grants for planning activities. (a) HUD will award...

  5. 24 CFR 598.400 - HUD grants for planning activities.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 3 2014-04-01 2013-04-01 true HUD grants for planning activities. 598.400 Section 598.400 Housing and Urban Development Regulations Relating to Housing and Urban... DESIGNATIONS Post-Designation Requirements § 598.400 HUD grants for planning activities. (a) HUD will award...

  6. 24 CFR 598.400 - HUD grants for planning activities.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 3 2013-04-01 2013-04-01 false HUD grants for planning activities. 598.400 Section 598.400 Housing and Urban Development Regulations Relating to Housing and Urban... DESIGNATIONS Post-Designation Requirements § 598.400 HUD grants for planning activities. (a) HUD will award...

  7. Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    GRYGIEL, M.L.

    1998-10-08

    Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baselinemore » and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system.« less

  8. Multi-day activity scheduling reactions to planned activities and future events in a dynamic model of activity-travel behavior

    NASA Astrophysics Data System (ADS)

    Nijland, Linda; Arentze, Theo; Timmermans, Harry

    2014-01-01

    Modeling multi-day planning has received scarce attention in activity-based transport demand modeling so far. However, new dynamic activity-based approaches are being developed at the current moment. The frequency and inflexibility of planned activities and events in activity schedules of individuals indicate the importance of incorporating those pre-planned activities in the new generation of dynamic travel demand models. Elaborating and combining previous work on event-driven activity generation, the aim of this paper is to develop and illustrate an extension of a need-based model of activity generation that takes into account possible influences of pre-planned activities and events. This paper describes the theory and shows the results of simulations of the extension. The simulation was conducted for six different activities, and the parameter values used were consistent with an earlier estimation study. The results show that the model works well and that the influences of the parameters are consistent, logical, and have clear interpretations. These findings offer further evidence of face and construct validity to the suggested modeling approach.

  9. Fox Valley Technical Institute Economic Development Plan.

    ERIC Educational Resources Information Center

    Fox Valley Technical Inst., Appleton, WI.

    Designed as an operating blueprint for Fox Valley Technical Institute's (FVTI's) economic development efforts, this guide incorporates the necessary operation procedures, descriptions, and resources for those involved in FVTI's effort to assist existing businesses to expand and to attract new businesses to the area. Introductory material describes…

  10. Configuration Management Plan for K Basins

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weir, W.R.; Laney, T.

    This plan describes a configuration management program for K Basins that establishes the systems, processes, and responsibilities necessary for implementation. The K Basins configuration management plan provides the methodology to establish, upgrade, reconstitute, and maintain the technical consistency among the requirements, physical configuration, and documentation. The technical consistency afforded by this plan ensures accurate technical information necessary to achieve the mission objectives that provide for the safe, economic, and environmentally sound management of K Basins and the stored material. The configuration management program architecture presented in this plan is based on the functional model established in the DOE Standard, DOE-STD-1073-93,more » {open_quotes}Guide for Operational Configuration Management Program{close_quotes}.« less

  11. 24 CFR 598.400 - HUD grants for planning activities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... process describes the procedures for award of these planning grants, post-award reporting requirements... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false HUD grants for planning activities... Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF...

  12. Egypt boosts family planning.

    PubMed

    1977-10-27

    A $4 million Agency for International Development (AID) agreement was signed in Cairo September 30 which will help the Egyptian government increase family planning services. The project is in response to a request for up to $17 million of AID funds for family planning programs during the next 3 years. The funds will pay for: contract advisors to provide short-term in-country training of physicians, architectural and engineering services to renovate a hospital for family planning and obstetrics/gynecology training, and a field training site for family planning service providers. Some Egyptians will receive training in specialized areas in the U.S. and other countries. More than $1.5 million of the $4 million will finance local costs of goods and services required. In addition, it is anticipated that U.S.-owned local currencies will be obligated for direct support of U.S. technical personnel. Over the 3-year life of the project the $17 million from AID plus $664,000 of U.S.-owned local currency will cover 44% of the total costs of selected Egyptian family planning activities. The Egyptian government will contribute at least $18.4 million and the U.N. Fund for Population Activities and the International Bank for Reconstruction and Development will contribute $4.3 million.

  13. [The plan for prevention of obesity of ASL RMB, Italy].

    PubMed

    Cairella, G; Ciaralli, F; Mangia, M L; Olivieri, L; Auriemma, P; Casagni, L; Castronuovo, E; ASL RMB Italy

    2009-01-01

    Lazio District, by pointing out the guidelines of the "Obesity and Overweight for Lazio District Plan" (DGR no1166, 23/12/05), enacts the "National Prevention Plan 2005-2007". The Public Health Service for Food and Nutrition has been the main player of the Plan; the District and Department of Health of the District had a technical and organizational support role. Within the development of the Plan for prevention of obesity of ASL RMB, a technical multidisciplinary group was constituted and three more programs were developed, all of them were dedicated to promotion and support of breast-feeding, prevention of obesity and overweight in childhood and adulthood. The educational activity concerning promotion and support of breast-feed ing actively involved operators from consultory rooms and hospital staff from ASL. The reports about nutritional surveillance allowed a careful analysis of the service conditions and priorities. Special criticality facets have been pointed out such as the high prevalence of overweight (31%) and obesity (7%), the habit of skipping breakfast, a low fruit and vegetables consumption, a generally sedentary lifestyle and, during the intervention, the parents' low involvement. In geriatric age cases, a high malnutrition risk both for overnutrition and undernutrition was found in the elderly groups that were checked; the diets' nutritional density as well as the physical activity aspect recover an important role in the intervention planning. Moreover the discussions with catering companies were an important aspect in order to make several target groups aware. The globally considered experience highlighted positive elements of mobilization, consensus, reorientation of activities and resources, giving proof of the significance of integration concerning specifical aims of different company services. Nevertheless, the carrying on of such activities needs resource investments in the specifical area and enlargement of activities especially for the

  14. Supporting Active Living Through Community Plans: The Association of Planning Documents With Design Standards and Features.

    PubMed

    Peterson, Erin L; Carlson, Susan A; Schmid, Thomas L; Brown, David R; Galuska, Deborah A

    2018-01-01

    The purpose of this study was to examine the association between the presence of supportive community planning documents in US municipalities with design standards and requirements supportive of active living. Cross-sectional study using data from the 2014 National Survey of Community-Based Policy and Environmental Supports for Healthy Eating and Active Living. Nationally representative sample of US municipalities. Respondents are 2005 local officials. Assessed: (1) The presence of design standards and feature requirements and (2) the association between planning documents and design standards and feature requirements supportive of active living in policies for development. Using logistic regression, significant trends were identified in the presence of design standards and feature requirements by plan and number of supportive objectives present. Prevalence of design standards ranged from 19% (developer dedicated right-of-way for bicycle infrastructure development) to 50% (traffic-calming features in areas with high pedestrian and bicycle volume). Features required in policies for development ranged from 14% (short/medium pedestrian-scale block sizes) to 44% (minimum sidewalk widths of 5 feet) of municipalities. As the number of objectives in municipal plans increased, there was a significant and positive trend ( P < .05) in the prevalence of each design standard and requirement. Municipal planning documents containing objectives supportive of physical activity are associated with design standards and feature requirements supportive of activity-friendly communities.

  15. Ten rules for asset protection planning.

    PubMed

    Adkisson, Jay D; Keller, Lawrence B

    2013-12-01

    Asset protection planning is a highly technical area of legal planning. Because of the fraudulent transfer laws, asset protection planning must be done in advance of any claim, be technically sound, not rely upon secrecy, and avoid any number of critical mistakes including keeping personal and business assets separate. Physicians who engage in asset protection planning must avoid critical mistakes, and not count on bankruptcy to provide relief from creditors. General rules and cautions for those who are considering the creation of an asset protection plan for their personal assets.

  16. NASA Technical Standards Program

    NASA Technical Reports Server (NTRS)

    Gill, Paul S.; Vaughan, William W.; Parker, Nelson C. (Technical Monitor)

    2002-01-01

    The NASA Technical Standards Program was officially established in 1997 as result of a directive issued by the Administrator. It is responsible for Agency wide technical standards development, adoption (endorsement), and conversion of Center-unique standards for Agency wide use. One major element of the Program is the review of NSA technical standards products and replacement with non-Government Voluntary Consensus Standards in accordance with directions issued by the Office of Management and Budget. As part of the Program's function, it developed a NASA Integrated Technical Standards Initiative that consists of and Agency wide full-text system, standards update notification system, and lessons learned-standards integration system. The Program maintains a 'one stop-shop' Website for technical standards ad related information on aerospace materials, etc. This paper provides information on the development, current status, and plans for the NAS Technical Standards Program along with metrics on the utility of the products provided to both users within the nasa.gov Domain and the Public Domain.

  17. NASA Technical Standards Program

    NASA Technical Reports Server (NTRS)

    Gill, Paul S.; Vaughan, WIlliam W.

    2003-01-01

    The NASA Technical Standards Program was officially established in 1997 as result of a directive issued by the Administrator. It is responsible for Agency wide technical standards development, adoption (endorsement), and conversion of Center-unique standards for Agency wide use. One major element of the Program is the review of NSA technical standards products and replacement with non-Government Voluntary Consensus Standards in accordance with directions issued by the Office of Management and Budget. As part of the Program s function, it developed a NASA Integrated Technical Standards Initiative that consists of and Agency wide full-text system, standards update notification system, and lessons learned - standards integration system. The Program maintains a "one stop-shop" Website for technical standards ad related information on aerospace materials, etc. This paper provides information on the development, current status, and plans for the NAS Technical Standards Program along with metrics on the utility of the products provided to both users within the nasa.gov Domain and the Public Domain.

  18. Conservation planning and accomplishments for protection of Cerulean Warbler (Setophaga cerulea) nonbreeding habitat

    Treesearch

    Benjamin Skolnik; David Wiedenfeld; Randy Dettmers; Constantino Aucca; Lina Daza; Heidy Valle; Francisco Sornoza; Javier Robayo; David Diaz; Jane Fitzgerald; Daniel Lebbin; Paul B. Hamel

    2012-01-01

    Vital to the work of the Cerulean Warbler Technical Group has been the collaboration among members to evaluate population status and coordinate planning for future activities, principally in conservation implementation. Two plans have been produced, one a general strategy for the conservation and management of the species over its entire range, and a more restricted...

  19. An audit questionnaire that examines specifically the management of technical activities clauses in ISO 15189.

    PubMed

    Hartley, T F

    2010-01-01

    The aim of this study was to design an audit questionnaire that focuses on the management of the technical activities in a Diagnostic Pathology Laboratory. The ISO 15189 Standard is written in such a way that it continually moves back and forth from topics where the auditor needs to question bench level staff, to topics where the auditor needs to question Technical Management Staff. This makes for a disjointed audit process - both Bench Staff and Technical Managers are repeatedly interrupted. The solution was to do a clause by clause analysis of the Standard and assign the major responsibility for the compliance to each clause to either Technical Managers or Bench Staff. The Clauses were then grouped under four topic headings regardless of whether they were a Section 4 or Section 5 Clause. Two questionnaires have emerged - the one described in this work and one directed primarily towards the activities of bench staff. There are 95 questions and it takes approximately two hours to complete.

  20. Technical aspects of the integration of three-dimensional treatment planning dose parameters (GEC-ESTRO Working Group) into pre-implant planning for LDR gynecological interstitial brachytherapy.

    PubMed

    Chi, A; Gao, M; Nguyen, N P; Albuquerque, K

    2009-06-01

    This study investigates the technical feasibility of pre-implant image-based treatment planning for LDR GYN interstitial brachytherapy(IB) based on the GEC-ESTRO guidelines. Initially, a virtual plan is generated based on the prescription dose and GEC-ESTRO defined OAR dose constraints with a pre-implant CT. After the actual implant, a regular diagnostic CT was obtained and fused with our pre-implant scan/initial treatment plan in our planning software. The Flexi-needle position changes, and treatment plan modifications were made if needed. Dose values were normalized to equivalent doses in 2 Gy fractions (LQED 2 Gy) derived from the linear-quadratic model with alpha/beta of 3 for late responding tissues and alpha/beta of 10 for early responding tissues. D(90) to the CTV, which was gross tumor (GTV) at the time of brachytherapy with a margin to count for microscopic disease, was 84.7 +/- 4.9% of the prescribed dose. The OAR doses were evaluated by D(2cc) (EBRT+IB). Mean D(2cc) values (LQED(2Gy)) for the rectum, bladder, sigmoid, and small bowel were the following: 63.7 +/- 8.4 Gy, 61.2 +/- 6.9 Gy, 48.0 +/- 3.5 Gy, and 49.9 +/- 4.2 Gy. This study confirms the feasibility of applying the GEC-ESTRO recommended dose parameters in pre-implant CT-based treatment planning in GYN IB. In the process, this pre-implant technique also demonstrates a good approximation of the target volume dose coverage, and doses to the OARs.

  1. Advanced Risk Reduction Tool (ARRT) Special Case Study Report: Science and Engineering Technical Assessments (SETA) Program

    NASA Technical Reports Server (NTRS)

    Kirsch, Paul J.; Hayes, Jane; Zelinski, Lillian

    2000-01-01

    This special case study report presents the Science and Engineering Technical Assessments (SETA) team's findings for exploring the correlation between the underlying models of Advanced Risk Reduction Tool (ARRT) relative to how it identifies, estimates, and integrates Independent Verification & Validation (IV&V) activities. The special case study was conducted under the provisions of SETA Contract Task Order (CTO) 15 and the approved technical approach documented in the CTO-15 Modification #1 Task Project Plan.

  2. FY 1986 current fiscal year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office/RI during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, taskmore » monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. System models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less

  3. Impact of Automation on Technical Services.

    ERIC Educational Resources Information Center

    Rooks, Dana C.; Thompson, Linda L.

    1988-01-01

    Discusses the impact of automation on library technical services, and the need for library managers to be aware of the issues involved and to plan for future developments. The discussion focuses on the areas of job related concerns of technical staff, organizational structures, recruitment and training, and ergonomic considerations. (CLB)

  4. MHD program plan, FY 1991

    NASA Astrophysics Data System (ADS)

    1990-10-01

    The current magnetohydrodynamic MHD program being implemented is a result of a consensus established in public meetings held by the Department of Energy in 1984. The public meetings were followed by the formulation of a June 1984 Coal-Fired MHD Preliminary Transition and Program Plan. This plan focused on demonstrating the proof-of-concept (POC) of coal-fired MHD electric power plants by the early 1990s. MHD test data indicate that while there are no fundamental technical barriers impeding the development of MHD power plants, technical risk remains. To reduce the technical risk three key subsystems (topping cycle, bottoming cycle, and seed regeneration) are being assembled and tested separately. The program does not require fabrication of a complete superconducting magnet, but rather the development and testing of superconductor cables. The topping cycle system test objectives can be achieved using a conventional iron core magnet system already in place at a DOE facility. Systems engineering-derived requirements and analytical modeling to support scale-up and component design guide the program. In response to environmental, economic, engineering, and utility acceptance requirements, design choices and operating modes are tested and refined to provide technical specifications for meeting commercial criteria. These engineering activities are supported by comprehensive and continuing systems analyses to establish realistic technical requirements and cost data. Essential elements of the current program are to: develop technical and environmental data for the integrated MHD topping cycle and bottoming cycle systems through POC testing (1000 and 4000 hours, respectively); design, construct, and operate a POC seed regeneration system capable of processing spent seed materials from the MHD bottoming cycle; prepare conceptual designs for a site specific MHD retrofit plant; and continue supporting research necessary for system testing.

  5. Active Rack Isolation System Program and Technical Status

    NASA Technical Reports Server (NTRS)

    Bushnell, Glenn; Fialho, Ian; Allen, James; Quraishi, Naveed

    2000-01-01

    The Boeing Active Rack Isolation System (ARIS) is one of the means used to isolate acceleration-sensitive scientific experiments from structurally transmitted disturbances aboard the International Space Station. The presentation provides an overview of ARIS and technical issues associated with the development of the active control system. An overview of ARIS analytical models is presented along with recent isolation performance predictions made using these models. Issues associated with commanding and capturing ARIS data are discussed and possible future options based on the ARIS ISS Characterization Experiment (ICE) Payload On-orbit Processor (POP) are outlined. An overview of the ARIS-ICE experiment scheduled to fly on ISS Flight 6A is presented. The presentation concludes with a discussion of recent- developmental work that includes passive rack damping, umbilical redesigns and advanced multivariable control design methods.

  6. Educational affairs plan: A five-year strategy

    NASA Technical Reports Server (NTRS)

    1987-01-01

    A five-year plan is presented to guide the use of NASA resources in administering a focused and consistent set of aeronautics and space science education programs. Major initiatives outlined in this plan fall into two categories: programmatic priorities and institutional priorities. Programmatic priorities for this plan include elementary education, teacher education, underrepresented minority participation, educational technology and the Aerospace Education Services Project (AESP). Institutional priorities highlighted in this plan include university programs, educational publications and their distribution, educational partnerships with public and private organizations, educational research and evaluation, and activities of the educational affairs administration. The plan's aim is to directly and indirectly help to ensure an adequate pool of talented scientists, engineers and technical personnel to keep NASA at the forefront of advancements for the 21st century.

  7. 76 FR 7870 - Agency Information Collection Activities: Cybersecurity and Communications Technical Assistance...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-11

    ... DEPARTMENT OF HOMELAND SECURITY [Docket No. DHS-2010-0006] Agency Information Collection Activities: Cybersecurity and Communications Technical Assistance Request and Evaluation AGENCY: National... Programs Directorate (NPPD), Office of Cybersecurity and Communications (CS&C), Office of Emergency...

  8. 30 CFR 777.13 - Reporting of technical data.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... descriptions of the methodology used to collect and analyze the data. (b) Technical analyses shall be planned... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Reporting of technical data. 777.13 Section 777... PROGRAMS GENERAL CONTENT REQUIREMENTS FOR PERMIT APPLICATIONS § 777.13 Reporting of technical data. (a) All...

  9. Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eggeman, Tim; O'Neill, Brian

    2016-08-17

    ZeaChem Inc. and US DOE successfully demonstrated the ZeaChem process for producing sugars and ethanol from high-impact biomass feedstocks. The project was executed over a 5-year period under a $31.25 million cooperative agreement (80:20 Federal:ZeaChem cost share). The project was managed by dividing it into three budget periods. Activities during Budget Period 1 were limited to planning, permitting, and other pre-construction planning. Budget Period 2 activities included engineering, procurement, construction, commissioning, start-up and initial operations through the Independent Engineer Test Runs. The scope of construction was limited to the Chem Frac and Hydrogenolysis units, as the Core Facility was alreadymore » in place. Construction was complete in December 2012, and the first cellulosic ethanol was produced in February 2013. Additional operational test runs were conducted during Budget Period 3 (completed June 2015) using hybrid poplar, corn stover, and wheat straw feedstocks, resulting in the production of cellulosic ethanol and various other biorefinery intermediates. The research adds to the understanding of the Chem Frac and Hydrogenolysis technologies in that the technical performance of each unit was measured, and the resulting data and operational experience can be used as the basis for engineering designs, thus mitigating risks for deployment in future commercial facilities. The Chem Frac unit was initially designed to be operated as two-stage dilute acid hydrolysis, with first stage conditions selected to remove the hemicellulose fraction of the feedstock, and the second stage conditions selected to remove the cellulose fraction. While the Chem Frac unit met or exceeded the design capacity of 10 ton(dry)/day, the technical effectiveness of the Chem Frac unit was below expectations in its initial two-stage dilute acid configuration. The sugars yields were low, the sugars were dilute, and the sugars had poor fermentability caused by excessive

  10. Planning Mediates Between Self-Efficacy and Physical Activity Among Motivated Young Adults.

    PubMed

    Zhou, Guangyu; Wang, Dongmei; Knoll, Nina; Schwarzer, Ralf

    2016-01-01

    Often, motivation to be physically active is a necessary precondition of action but still does not suffice to initiate the target behavior. Instead, motivation needs to be translated into action by a self-regulatory process. Self-efficacy and planning are considered to be useful constructs that help to facilitate such translations. The aim is to examine the roles of motivation, planning, and self-efficacy as well as the mechanisms that operate in the change of physical activity levels. In a longitudinal observation study with 249 young adults, self-efficacy, planning, motivation, and physical activity were assessed at 2 points in time, 3 months apart. Planning served as a mediator between self-efficacy and physical activity, controlling for baseline activity. In addition to this indirect effect, a moderator effect was found between self-efficacy and stages of change on planning. The mediation operated only in motivated, but not in unmotivated students. A mediation from self-efficacy via planning to physical activity seems to be likely only when people are motivated to become more active.

  11. Professional, Technical and Kindred Workers: Where They Come From, Where They Go In The Commonwealth of Pennsylvania. Information For Student Career Planning.

    ERIC Educational Resources Information Center

    Driscoll, Jeanne Baker; Herr, Edwin L.

    Intended for use in occupational and education planning by students and counselors, this document contains information about the 106 occupations which are included in the professional, technical, and kindred workers cluster of the U.S. census. The occupations are grouped by field of interest. For each occupation, the information provided includes…

  12. Mission activities planning for a Hermes mission by means of AI-technology

    NASA Technical Reports Server (NTRS)

    Pape, U.; Hajen, G.; Schielow, N.; Mitschdoerfer, P.; Allard, F.

    1993-01-01

    Mission Activities Planning is a complex task to be performed by mission control centers. AI technology can offer attractive solutions to the planning problem. This paper presents the use of a new AI-based Mission Planning System for crew activity planning. Based on a HERMES servicing mission to the COLUMBUS Man Tended Free Flyer (MTFF) with complex time and resource constraints, approximately 2000 activities with 50 different resources have been generated, processed, and planned with parametric variation of operationally sensitive parameters. The architecture, as well as the performance of the mission planning system, is discussed. An outlook to future planning scenarios, the requirements, and how a system like MARS can fulfill those requirements is given.

  13. [In search of results of technical cooperation].

    PubMed

    Jourdan Hidalgo, L; Manuel Sotelo, J

    1999-06-01

    For the Pan American Health Organization (PAHO), technical cooperation (TC) is the process by which the PAHO Member States work with the Organization, as equal partners, to identify and reach their own health goals and to promote self-sufficiency in health development, through programs that respond to those countries' needs and national priorities. Since 1978, PAHO has used the American Regional Planning, Programming, Monitoring, and Evaluation System (AMPES) to establish management procedures and to facilitate decision-making in health TC. As part of AMPES, PAHO uses a "logical approach to project management" to structure the work program of the Organization and to identify the expected results from TC activities and TC resource investments. This project management approach, which replaces the "functional approaches" system used to date, also helps establish a causative relationship between the programmed activities and the results that PAHO expects, and between the activities and the hoped-for outcomes in the countries. As part of an ongoing process of rethinking international health TC, several years ago PAHO began a four-phase study on the usefulness and validity of functional approaches and on the need to propose new ones or to modify existing ones. The results of the initial phase showed it was difficult to classify the activities because the functional-approaches categories were not mutually exclusive and the TC activities were complex. Further, the expected results did not specify the product for which the PAHO Secretariat was accountable within a certain time frame nor the Secretariat's level of responsibility. Thus, a new and more flexible classification of expected results was proposed, with the following categories: cooperation networks and alliances; surveillance and information systems; standards and guidelines; research and evaluation studies; plans, projects, and policies; methods, models, and technologies; training programs; promotional campaigns

  14. Technical aspects of virtual liver resection planning.

    PubMed

    Glombitza, G; Lamadé, W; Demiris, A M; Göpfert, M R; Mayer, A; Bahner, M L; Meinzer, H P; Richter, G; Lehnert, T; Herfarth, C

    1998-01-01

    Operability of a liver tumor is depending on its three dimensional relation to the intrahepatic vascular trees which define autonomously functioning liver (sub-)segments. Precise operation planning is complicated by anatomic variability, distortion of the vascular trees by the tumor or preceding liver resections. Because of the missing possibility to track the deformation of the liver during the operation an integration of the resection planning system into an intra-operative navigation system is not feasible. So the main task of an operation planning system in this domain is a quantifiable patient selection by exact prediction of post-operative liver function and a quantifiable resection proposal. The system quantifies the organ structures and resection volumes by means of absolute and relative values. It defines resection planes depending on security margins and the vascular trees and presents the data in visualized form as a 3D movie. The new 3D operation planning system offers quantifiable liver resection proposals based on individualized liver anatomy. The results are visualized in digital movies as well as in quantitative reports.

  15. RTO Technical Publications: A Quarterly Listing

    NASA Technical Reports Server (NTRS)

    2005-01-01

    A quarterly listing of RTO technical publications is presented. The topics include: Handbook on the Analysis of Smaller-Scale Contingency Operations in Long Term Defence Planning; 2) Radar Polarimetry and Interferometry; 3) Combat Casualty Care in Ground-Based Tactical Situations: Trauma Technology and Emergency Medical Procedures; and 4) RTO Technical Publications: A Quarterly Listing

  16. Management of technical date in Nihon Doro kodan

    NASA Astrophysics Data System (ADS)

    Hanada, Jun'ichi

    Nihon Doro Kodan Laboratory has collected and contributed technical data (microfiches, aerial photographs, books and literature) on plans, designs, constructions and maintenance of the national expressways and the ordinary toll roads since 1968. This work is systematized on computer to retrieve and contribute data faster. Now Laboratory operates Technical Data Management System which manages all of technical data and Technical Document Management System which manages technical documents. These systems stand on users' on-line retrieval and data accumuration by microfiches and optical disks.

  17. An independent assessment of the technical feasibility of the Mars One mission plan - Updated analysis

    NASA Astrophysics Data System (ADS)

    Do, Sydney; Owens, Andrew; Ho, Koki; Schreiner, Samuel; de Weck, Olivier

    2016-03-01

    In recent years, the Mars One program has gained significant publicity for its plans to colonize the red planet. Beginning in 2025, the program plans to land four people on Mars every 26 months via a series of one-way missions, using exclusively existing technology. This one-way approach has frequently been cited as a key enabler of accelerating the first crewed landing on Mars. While the Mars One program has received considerable attention, little has been published in the technical literature regarding the formulation of its mission architecture. In light of this, we perform an independent analysis of the technical feasibility of the Mars One mission plan, focusing on the architecture of the life support and in-situ resource utilization (ISRU) systems, and their impact on sparing and space logistics. To perform this analysis, we adopt an iterative analysis approach in which we model and simulate the mission architecture, assess its feasibility, implement any applicable modifications while attempting to remain within the constraints set forth by Mars One, and then resimulate and reanalyze the revised version of the mission architecture. Where required information regarding the Mars One mission architecture is not available, we assume numerical values derived from standard spaceflight design handbooks and documents. Through four iterations of this process, our analysis finds that the Mars One mission plan, as publicly described, is not feasible. This conclusion is obtained from analyses based on mission assumptions derived from and constrained by statements made by Mars One, and is the result of the following findings: (1) several technologies including ISRU, life support, and entry, descent, and landing (EDL) are not currently "existing, validated and available" as claimed by Mars One; (2) the crop growth area described by Mars One is insufficient to feed their crew; (3) increasing the crop growth area to provide sufficient food for the crew leads to atmospheric

  18. The Planning Illusion: Does Active Planning of a Learning Route Support Learning as Well as Learners Think It Does?

    ERIC Educational Resources Information Center

    Bonestroo, Wilco J.; de Jong, Ton

    2012-01-01

    Is actively planning one's learning route through a learning domain beneficial for learning? Moreover, can learners accurately judge the extent to which planning has been beneficial for them? This study examined the effects of active planning on learning. Participants received a tool in which they created a learning route themselves before…

  19. Technical Basis for Electromagnetic Compatibility Regulatory Guidance Update

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ewing, Paul D.; Korsah, Kofi; Harrison, Thomas J.

    2016-03-01

    The objective of this report is to serve as the technical basis document for the next, planned revision of this RG that highlights and provides the rationale for the recommended changes. The structure of this document follows and summarizes the several assessment activities undertaken during the course of this project to evaluate new and updated electromagnetic compatibility (EMC) standards, testing methods and limits, and relevant technology developments being incorporated into plant activities that may have EMI/RFI implications, as well as other specific issues, including impacts of electrostatic discharge (ESD) on safety equipment and impacts on increased usage of wireless devicesmore » in nuclear power plants.« less

  20. Technical Assessment of the National Full Scale Aerodynamic Complex Fan Blades Repair

    NASA Technical Reports Server (NTRS)

    Young, Clarence P., Jr.; Dixon, Peter G.; St.Clair, Terry L.; Johns, William E.

    1998-01-01

    This report describes the principal activities of a technical review team formed to address National Full Scale Aerodynamic Complex (NFAC) blade repair problems. In particular, the problem of lack of good adhesive bonding of the composite overwrap to the Hyduliginum wood blade material was studied extensively. Description of action plans and technical elements of the plans are provided. Results of experiments designed to optimize the bonding process and bonding strengths obtained on a full scale blade using a two-step cure process with adhesive primers are presented. Consensus recommendations developed by the review team in conjunction with the NASA Ames Fan Blade Repair Project Team are provided along with lessons learned on this program. Implementation of recommendations resulted in achieving good adhesive bonds between the composite materials and wooden blades, thereby providing assurance that the repaired fan blades will meet or exceed operational life requirements.

  1. Hanford Site Composite Analysis Technical Approach Description: Groundwater Pathway Dose Calculation.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Morgans, D. L.; Lindberg, S. L.

    The purpose of this technical approach document (TAD) is to document the assumptions, equations, and methods used to perform the groundwater pathway radiological dose calculations for the revised Hanford Site Composite Analysis (CA). DOE M 435.1-1, states, “The composite analysis results shall be used for planning, radiation protection activities, and future use commitments to minimize the likelihood that current low-level waste disposal activities will result in the need for future corrective or remedial actions to adequately protect the public and the environment.”

  2. 7 CFR 610.32 - Technical assistance furnished.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE CONSERVATION OPERATIONS TECHNICAL ASSISTANCE Conservation of Private Grazing Land... managers to plan and implement resource conservation on grazing land. The objective of planning on grazing...

  3. 7 CFR 610.32 - Technical assistance furnished.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE CONSERVATION OPERATIONS TECHNICAL ASSISTANCE Conservation of Private Grazing Land... managers to plan and implement resource conservation on grazing land. The objective of planning on grazing...

  4. 7 CFR 610.32 - Technical assistance furnished.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE CONSERVATION OPERATIONS TECHNICAL ASSISTANCE Conservation of Private Grazing Land... managers to plan and implement resource conservation on grazing land. The objective of planning on grazing...

  5. 7 CFR 610.32 - Technical assistance furnished.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE CONSERVATION OPERATIONS TECHNICAL ASSISTANCE Conservation of Private Grazing Land... managers to plan and implement resource conservation on grazing land. The objective of planning on grazing...

  6. 7 CFR 610.32 - Technical assistance furnished.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE CONSERVATION OPERATIONS TECHNICAL ASSISTANCE Conservation of Private Grazing Land... managers to plan and implement resource conservation on grazing land. The objective of planning on grazing...

  7. Louisiana Airport System Plan.

    DOT National Transportation Integrated Search

    1992-10-01

    This report is a non-technical summary of the update to the Louisiana Airport System Plan. The system plan identifies the location, service level, and role of the 81 airports included in the plan and the costs to develop individual airports and the a...

  8. Low Impact Development Master Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Loftin, Samuel R.

    This project creates a Low Impact Development (LID) Master Plan to guide and prioritize future development of LID projects at Los Alamos National Laboratory (LANL or the Laboratory). The LID Master Plan applies to developed areas across the Laboratory and focuses on identifying opportunities for storm water quality and hydrological improvements in the heavily urbanized areas of Technical Areas 03, 35 and 53. The LID Master Plan is organized to allow the addition of LID projects for other technical areas as time and funds allow in the future.

  9. Resource Planning Model | Energy Analysis | NREL

    Science.gov Websites

    balancing authority. An image of a overlapping circles labelled Resource, Technical, Economic, and Market competing electricity technologies. An image of a overlapping circles labelled Resource, Technical, Economic ; Federal Resource Planning. Volume 1: Sectoral, Technical, and Economic Trends, NREL Technical Report (2016

  10. NASA SCIENTIFIC AND TECHNICAL INFORMATION (STI) PROGRAM PLAN

    EPA Science Inventory

    NASA's scientific and technical information (STI) is an essential product of research, facilitates technology transfer, and enhances the competitive edge of U.S. companies and educational institutions. NASA's STI is an integral part of NASA's information transfer and is critical...

  11. Presentation Of Comparative Data for Transportation Planning Studies

    DOT National Transportation Integrated Search

    1997-01-01

    Clear, yet detailed, presentations of transportation planning data to lay groups as well as to technical groups is becoming more and more of a necessity in the planning process. Presentation of technical information in understandable terms has become...

  12. The Method of Multiple Spatial Planning Basic Map

    NASA Astrophysics Data System (ADS)

    Zhang, C.; Fang, C.

    2018-04-01

    The "Provincial Space Plan Pilot Program" issued in December 2016 pointed out that the existing space management and control information management platforms of various departments were integrated, and a spatial planning information management platform was established to integrate basic data, target indicators, space coordinates, and technical specifications. The planning and preparation will provide supportive decision support, digital monitoring and evaluation of the implementation of the plan, implementation of various types of investment projects and space management and control departments involved in military construction projects in parallel to approve and approve, and improve the efficiency of administrative approval. The space planning system should be set up to delimit the control limits for the development of production, life and ecological space, and the control of use is implemented. On the one hand, it is necessary to clarify the functional orientation between various kinds of planning space. On the other hand, it is necessary to achieve "multi-compliance" of various space planning. Multiple spatial planning intergration need unified and standard basic map(geographic database and technical specificaton) to division of urban, agricultural, ecological three types of space and provide technical support for the refinement of the space control zoning for the relevant planning. The article analysis the main space datum, the land use classification standards, base map planning, planning basic platform main technical problems. Based on the geographic conditions, the results of the census preparation of spatial planning map, and Heilongjiang, Hainan many rules combined with a pilot application.

  13. Louisiana ITS business plan : technical summary.

    DOT National Transportation Integrated Search

    2000-03-01

    The objectives are defined under: 1. Development of the plan, which identifies the preferred program of projects and policy initiatives and outlines the purpose, requirements, responsibilities, estimated cost, and implementation schedule for each pla...

  14. Planning and scheduling lessons learned study, executive summary

    NASA Technical Reports Server (NTRS)

    Robinson, Toni

    1990-01-01

    The study was performed to document the lessons on planning and scheduling activities for a number of missions and institutional facilities in such a way that they can be applied to future missions; to provide recommendations to both projects and Code 500 that will improve the end-to-end planning and scheduling process; and to identify what, if any, mission characteristics might be related to certain lessons learned. The results are a series of recommendations of both a managerial and technical nature related to the underlying lessons learned.

  15. Robot Plans and Human Plans: Implications for Models of Communication. Technical Report No. 314.

    ERIC Educational Resources Information Center

    Bruce, Bertram

    People in interaction with others organize their perceptions of a social situation in terms of plans even when the others' plans are poorly formulated. They use their models of others' plans in formulating their own. Much of what occurs in discourse centers on a continual communication about and reformulation of one's own plans and one's own…

  16. Synergistic Effects of Planning and Self-Efficacy on Physical Activity

    ERIC Educational Resources Information Center

    Koring, Milena; Richert, Jana; Lippke, Sonia; Parschau, Linda; Reuter, Tabea; Schwarzer, Ralf

    2012-01-01

    Many individuals are motivated to improve their physical activity levels but often fail to act on their good intention. This study examines the roles of planning and self-efficacy in the prediction of physical activity. A total of 290 participants (77% women, mean age = 41.9 years) were surveyed three times. Intentions, planning, and physical…

  17. Ride-sharing activities in the Richmond regional planning district.

    DOT National Transportation Integrated Search

    1977-01-01

    This report gives the results of a survey made of industries in the Richmond Regional Planning District to determine the current and expected ride-sharing activities there and the type of information deemed most useful in planning ride-sharing progra...

  18. Man in the North Technical Paper. Education in the Canadian North, Report Two: Apprentice Teachers.

    ERIC Educational Resources Information Center

    Brown, Doug; And Others

    The objective of this applied research project was to evaluate a formula by which young native Canadians would become teachers through in-service training coupled with academic upgrading. The experiment design paired apprentice and cooperating teachers, provided technical help, planned a schedule of activities for the apprentice, and assessed the…

  19. Planning emergency medical communications

    DOT National Transportation Integrated Search

    1996-06-01

    This technical bulletin summarizes a two volume publication entitled "Planning Emergency Medical Communications." Volume One, the State Level Planning Guide, contains general background information about a two tiered approach to EMS communications pl...

  20. Navigation: National Plans; NAVSTAR-GPS; Laser Gyros

    DTIC Science & Technology

    1982-08-31

    REFERENC-~CP STER . TECHNICAL REPORT ! "NO. 12686,-’-. - NAVIGATION: NATIONAL PLANS ; NAVSTAR-GPS; LASER GYROS CONTRACT NO. DAAK30-80-C-0073 31 AUGUST...Technical ReportAW Ng. riiNational Plans ; Navstar-GPS; S... : NavstarGPS; a3 Sept 1980 - 31 Aug 1982 ....Lasr Gyros. 6. PERFORMING ORG. REPORT NUMBER PRA...identify by block number) Navigation Navigation Satellites Laser Gyros Position-Location . NAVSTAR-GPS Fiberoptic Gyros Planning Global Positioning System

  1. An Extensible, User- Modifiable Framework for Planning Activities

    NASA Technical Reports Server (NTRS)

    Joshing, Joseph C.; Abramyan, Lucy; Mickelson, Megan C.; Wallick, Michael N.; Kurien, James A.; Crockett, Thomasa M.; Powell, Mark W.; Pyrzak, Guy; Aghevli, Arash

    2013-01-01

    This software provides a development framework that allows planning activities for the Mars Science Laboratory rover to be altered at any time, based on changes of the Activity Dictionary. The Activity Dictionary contains the definition of all activities that can be carried out by a particular asset (robotic or human). These definitions (and combinations of these definitions) are used by mission planners to give a daily plan of what a mission should do. During the development and course of the mission, the Activity Dictionary and actions that are going to be carried out will often be changed. Previously, such changes would require a change to the software and redeployment. Now, the Activity Dictionary authors are able to customize activity definitions, parameters, and resource usage without requiring redeployment. This software provides developers and end users the ability to modify the behavior of automatically generated activities using a script. This allows changes to the software behavior without incurring the burden of redeployment. This software is currently being used for the Mars Science Laboratory, and is in the process of being integrated into the LADEE (Lunar Atmosphere and Dust Environment Explorer) mission, as well as the International Space Station.

  2. Technical Report on Manpower Planning. Technical Group Report No. 7.

    ERIC Educational Resources Information Center

    Montana Commission on Post-Secondary Education, Helena.

    The report is one of a series containing data and recommendations relevant to the task of developing future plans for Montana's post-secondary education. A brief introduction outlines the methods used in gathering information on manpower needs, and is followed by a review and summarization of the data collected, including a description, analysis,…

  3. Conceptualizing 2000: Proactive Planning.

    ERIC Educational Resources Information Center

    Angel, Dan, Ed.; DeVault, Mike, Ed.

    As community, technical, and junior colleges approach the 21st century, faculty shortages, an increasingly diverse student body, dwindling financial resources, and accountability mandates will require careful, action-oriented college planning. This two-part book presents 10 articles on the dynamics of planning and specific planning models, and…

  4. 48 CFR 2131.205-43 - Trade, business, technical and professional activity costs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Trade, business, technical and professional activity costs. 2131.205-43 Section 2131.205-43 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT, FEDERAL EMPLOYEES GROUP LIFE INSURANCE FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT...

  5. 48 CFR 1631.205-76 - Trade, business, technical, and professional activity costs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Trade, business, technical, and professional activity costs. 1631.205-76 Section 1631.205-76 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST...

  6. 48 CFR 2131.205-43 - Trade, business, technical and professional activity costs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Trade, business, technical and professional activity costs. 2131.205-43 Section 2131.205-43 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT, FEDERAL EMPLOYEES GROUP LIFE INSURANCE FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT...

  7. 48 CFR 2131.205-43 - Trade, business, technical and professional activity costs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Trade, business, technical and professional activity costs. 2131.205-43 Section 2131.205-43 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT, FEDERAL EMPLOYEES GROUP LIFE INSURANCE FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT...

  8. 48 CFR 31.205-43 - Trade, business, technical, and professional activity costs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Trade, business, technical, and professional activity costs. 31.205-43 Section 31.205-43 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial Organizations...

  9. 48 CFR 31.205-43 - Trade, business, technical, and professional activity costs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Trade, business, technical, and professional activity costs. 31.205-43 Section 31.205-43 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial Organizations...

  10. 48 CFR 1631.205-76 - Trade, business, technical, and professional activity costs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Trade, business, technical, and professional activity costs. 1631.205-76 Section 1631.205-76 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST...

  11. 48 CFR 31.205-43 - Trade, business, technical, and professional activity costs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Trade, business, technical, and professional activity costs. 31.205-43 Section 31.205-43 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial Organizations...

  12. 48 CFR 1631.205-76 - Trade, business, technical, and professional activity costs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Trade, business, technical, and professional activity costs. 1631.205-76 Section 1631.205-76 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST...

  13. 48 CFR 31.205-43 - Trade, business, technical, and professional activity costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Trade, business, technical, and professional activity costs. 31.205-43 Section 31.205-43 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial Organizations...

  14. 34 CFR 350.19 - What must a grantee do in carrying out a technical assistance activity?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false What must a grantee do in carrying out a technical... DISABILITY AND REHABILITATION RESEARCH PROJECTS AND CENTERS PROGRAM What Projects Does the Secretary Assist? § 350.19 What must a grantee do in carrying out a technical assistance activity? In carrying out a...

  15. 7 CFR 1780.54 - Technical services.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., Constructing and Inspections § 1780.54 Technical services. Owners are responsible for providing the engineering, architect and environmental services necessary for planning, designing, bidding, contracting, inspecting...

  16. Technical-Information Products for a National Volcano Early Warning System

    USGS Publications Warehouse

    Guffanti, Marianne; Brantley, Steven R.; Cervelli, Peter F.; Nye, Christopher J.; Serafino, George N.; Siebert, Lee; Venezky, Dina Y.; Wald, Lisa

    2007-01-01

    Introduction Technical outreach - distinct from general-interest and K-12 educational outreach - for volcanic hazards is aimed at providing usable scientific information about potential or ongoing volcanic activity to public officials, businesses, and individuals in support of their response, preparedness, and mitigation efforts. Within the context of a National Volcano Early Warning System (NVEWS) (Ewert et al., 2005), technical outreach is a critical process, transferring the benefits of enhanced monitoring and hazards research to key constituents who have to initiate actions or make policy decisions to lessen the hazardous impact of volcanic activity. This report discusses recommendations of the Technical-Information Products Working Group convened in 2006 as part of the NVEWS planning process. The basic charge to the Working Group was to identify a web-based, volcanological 'product line' for NVEWS to meet the specific hazard-information needs of technical users. Members of the Working Group were: *Marianne Guffanti (Chair), USGS, Reston VA *Steve Brantley, USGS, Hawaiian Volcano Observatory HI *Peter Cervelli, USGS, Alaska Volcano Observatory, Anchorage AK *Chris Nye, Division of Geological and Geophysical Surveys and Alaska Volcano Observatory, Fairbanks AK *George Serafino, National Oceanic and Atmospheric Administration, Camp Springs MD *Lee Siebert, Smithsonian Institution, Washington DC *Dina Venezky, USGS, Volcano Hazards Team, Menlo Park CA *Lisa Wald, USGS, Earthquake Hazards Program, Golden CO

  17. Structuring of manual of orientations and technical information for laundries of industries of animal products origin.

    PubMed

    da Silva, Vania Eugênia; Mafra, Simone Caldas Tavares; Mafra, Cláudio Lísias; de Souza, Amaury Paulo

    2012-01-01

    This study looked for to lift information regarding laundries inserted in industries of animal products origin, to understand the activities developed in the section and to structure a Manual of Planning and Technical Information for laundries to industries of animal products origin, with the intention of subsidizing the planning, structuring and control of this work place, because norms or regulations that supervise don't exist or aid their managers and workers as for the operation of this work place.

  18. Technical and Non-Technical Measures for air pollution emission reduction: The integrated assessment of the regional Air Quality Management Plans through the Italian national model

    NASA Astrophysics Data System (ADS)

    D'Elia, I.; Bencardino, M.; Ciancarella, L.; Contaldi, M.; Vialetto, G.

    2009-12-01

    The Italian Air Quality legislation underwent sweeping changes with the implementation of the 1996 European Air Quality Framework Directive when the Italian administrative Regions were entrusted with air quality management tasks. The most recent Regional Air Quality Management Plans (AQMPs) highlighted the importance of Non-Technical Measures (NTMs), in addition to Technical Measures (TMs), in meeting environmental targets. The aim of the present work is to compile a list of all the TMs and NTMs taken into account in the Italian Regional AQMPs and to give in the target year, 2010, an estimation of SO 2, NO x and PM 10 emission reductions, of PM 10 concentration and of the health impact of PM 2.5 concentrations in terms of Life Expectancy Reduction. In order to do that, RAINS-Italy, as part of the National Integrated Modeling system for International Negotiation on atmospheric pollution (MINNI), has been applied. The management of TMs and NTMs inside RAINS have often obliged both the introduction of exogenous driving force scenarios and the control strategy modification. This has inspired a revision of the many NTM definitions and a clear choice of the definition adopted. It was finally highlighted that only few TMs and NTMs implemented in the AQMPs represent effective measures in reaching the environmental targets.

  19. Organizing and Establishing a Media and Research Services Center in a Secondary Vocational-Technical School: Procedures, Activities, Conclusions.

    ERIC Educational Resources Information Center

    Minter, Anne

    Intended both as a report on an Elementary and Secondary Education Act of 1965 (ESEA) Title IV project and as a guide for others wishing to initiate centralized media services in vocational-technical schools, this document describes the planning, funding, establishment, and the 1980 to 1983 operations of the Natchez Vocational Media and Research…

  20. Resource Constrained Planning of Multiple Projects with Separable Activities

    NASA Astrophysics Data System (ADS)

    Fujii, Susumu; Morita, Hiroshi; Kanawa, Takuya

    In this study we consider a resource constrained planning problem of multiple projects with separable activities. This problem provides a plan to process the activities considering a resource availability with time window. We propose a solution algorithm based on the branch and bound method to obtain the optimal solution minimizing the completion time of all projects. We develop three methods for improvement of computational efficiency, that is, to obtain initial solution with minimum slack time rule, to estimate lower bound considering both time and resource constraints and to introduce an equivalence relation for bounding operation. The effectiveness of the proposed methods is demonstrated by numerical examples. Especially as the number of planning projects increases, the average computational time and the number of searched nodes are reduced.

  1. Health Related Occupations. Revised Summary Report: Technical Employment in Northeast Florida.

    ERIC Educational Resources Information Center

    Baker, William E.; And Others

    The document is one of five summary reports, all part of a Pre-Technical Curriculum Planning Project for secondary students who aspire to technical employment or post secondary technical education. This report represents the results of an assessment of the northeast Florida area's technical occupations in health related occupations. A three-phase…

  2. Configuration Management Plan for the Tank Farm Contractor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    WEIR, W.R.

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in themore » management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.« less

  3. The 1975 report on active and planned spacecraft and experiments. [index

    NASA Technical Reports Server (NTRS)

    Horowitz, R. (Editor); Davis, L. R. (Editor)

    1975-01-01

    Information is presented on current and planned spacecraft activity for various disciplines: astronomy, earth sciences, meteorology, planetary sciences, aeronomy, solar physics, and life sciences. For active orbiting spacecraft, the epoch date, orbit type, orbit period, apoasis, periapsis, and inclination are given along with the spacecraft weight, launch date, launch site, launch vehicle, and sponsoring agency. For each planned orbiting spacecraft, the orbit parameters, planned launch date, launch site, launch vehicle, spacecraft weight, and sponsoring agency are given.

  4. Loads and aeroelasticity division research and technology accomplishments for FY 1982 and plans for FY 1983

    NASA Technical Reports Server (NTRS)

    Gardner, J. E.

    1983-01-01

    Accomplishments of the past year and plans for the coming year are highlighted as they relate to five year plans and the objectives of the following technical areas: aerothermal loads; multidisciplinary analysis and optimization; unsteady aerodynamics; and configuration aeroelasticity. Areas of interest include thermal protection system concepts, active control, nonlinear aeroelastic analysis, aircraft aeroelasticity, and rotorcraft aeroelasticity and vibrations.

  5. UMTRA Project water sampling and analysis plan, Durango, Colorado. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-09-01

    Planned, routine ground water sampling activities at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Durango, Colorado, are described in this water sampling and analysis plan. The plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the routine monitoring stations at the site. The ground water data are used to characterize the site ground water compliance strategies and to monitor contaminants of potential concern identified in the baseline risk assessment (DOE, 1995a). Regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from themore » US EPA regulations in 40 CFR Part 192 (1994) and EPA standards of 1995 (60 FR 2854). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site.« less

  6. Junior Achievement Lesson Plans and Activity Ideas, 1997-98.

    ERIC Educational Resources Information Center

    Junior Achievemnt, Inc., Colorado Springs, CO.

    This packet contains economics lesson plans and activities for the high school student. Detailed lesson plans and worksheets address the following concepts: (1) stock market; (2) economics of water; (3) diaper economics; (4) quality; (5) scarcity; (6) steps to success; (7) effective marketing; (8) careers and success; (9) interviewing tips and…

  7. MAPGEN Planner: Mixed-Initiative Activity Planning for the Mars Exploration Rover Mission

    NASA Technical Reports Server (NTRS)

    Ai-Chang, Mitch; Bresina, John; Charest, Leonard; Hsu, Jennifer; Jonsson, Ari K.; Kanefsky, Bob; Maldague, Pierre; Morris, Paul; Rajan, Kanna; Yglesias, Jeffrey

    2003-01-01

    This document describes the Mixed-initiative Activity Plan Generation system MAPGEN. The system is be- ing developed as one of the tools to be used during surface operations of NASA's Mars Exploration Rover mission (MER). However, the core technology is general and can be adapted to different missions and applications. The motivation for the system is to better support users that need to rapidly build activity plans that have to satisfy complex rules and fit within resource limits. The system therefore combines an existing tool for activity plan editing and resource modeling, with an advanced constraint-based reasoning and planning framework. The demonstration will show the key capabilities of the automated reasoning and planning component of the system, with emphasis on how these capabilities will be used during surface operations of the MER mission.

  8. Does Satisfaction Reflect the Technical Quality of Mental Health Care?

    PubMed Central

    Edlund, Mark J; Young, Alexander S; Kung, Fuan Yue; Sherbourne, Cathy D; Wells, Kenneth B

    2003-01-01

    Objective To analyze the relationship between satisfaction and technical quality of care for common mental disorders. Data Source A nationally representative telephone survey of 9,585 individuals conducted in 1997–1998. Study Design Using multinomial logistic regression techniques we investigated the association between a five-level measure of satisfaction with the mental health care available for personal or emotional problems and two quality indicators. The first measure, appropriate technical quality, was defined as use of either appropriate counseling or psychotropic medications during the prior year for a probable depressive or anxiety disorder. The second, active treatment, indicated whether the respondent had received treatment for a psychiatric disorder in the past year. Covariates included measures of physical and mental health and sociodemographic indicators. Principal Findings Appropriate technical quality of care was significantly associated with higher levels of satisfaction. The strength of the association was moderate. Conclusions Satisfaction is associated with technical quality of care. However, profiling quality of care with satisfaction will likely require large samples and case-mix adjustment, which may be more difficult for plans or provider groups to implement than measuring technical indicators. More importantly, satisfaction is not the same as technical quality, and our results suggest that at this time they cannot be made to approach each other closely enough to eliminate either. PMID:12785565

  9. Introducing active learning pedagogy into a technical and vocational education and training academy in Kurdistan, Iraq

    NASA Astrophysics Data System (ADS)

    Dickson, Martina; Ladefoged, Svend Erik

    2017-10-01

    This article focuses on a teaching methodology project which investigated issues of teaching quality at a technical and vocational education and training (TVET) academy in Kurdistan, Northern Iraq. The academy was established in 2012 to provide unemployed youth with TVET, particularly workplace-relevant training. A needs analysis showed that the academy's teachers were mainly skilled in technical content areas rather than in pedagogy. Perhaps as a result, predominantly teacher-centred approaches to teaching were observed. However, teaching and learning in TVET, by its very definition, must consider active learning and practical training as core to its vocational purpose. Moreover, technical and pedagogical skills are intrinsically linked, since a teacher cannot effectively pass on technical skills without the necessary pedagogical skills to do so. It is on this premise that the authors of this article based their project, which was designed for the purpose of upgrading the teachers' pedagogical skills to incorporate more active learning strategies and practical work. Comparison of observation logs and feedback sessions at the conclusion of their project provided evidence that whilst some of the teachers' pedagogical skills had shifted towards using more dynamic teaching strategies, interviews strongly indicated that there was also some reluctance to incorporate active learning. In their conclusion, the authors suggest that the insights gained from this project could be further empirically examined in a larger, multi-institutional study.

  10. Health Activities for Primary School Students.

    ERIC Educational Resources Information Center

    Peace Corps, Washington, DC. Information Collection and Exchange Div.

    This manual targets new and second-year Peace Corps volunteers, presenting health lessons and activities for primary school students in Thailand. Each section of the manual outlines basic technical information about the topic, contains several detailed lesson plans, and lists quick activities that can be carried out at schools. Songs and recipes…

  11. International Space Station ECLSS Technical Task Agreement Summary Report

    NASA Technical Reports Server (NTRS)

    Ray, C. D. (Compiler); Salyer, B. H. (Compiler)

    1999-01-01

    This Technical Memorandum provides a summary of current work accomplished under Technical Task Agreement (TTA) by the Marshall Space Flight Center (MSFC) regarding the International Space Station (ISS) Environmental Control and Life Support System (ECLSS). Current activities include ECLSS component design and development, computer model development, subsystem/integrated system testing, life testing, and general test support provided to the ISS program. Under ECLSS design, MSFC was responsible for the six major ECLSS functions, specifications and standard, component design and development, and was the architectural control agent for the ISS ECLSS. MSFC was responsible for ECLSS analytical model development. In-house subsystem and system level analysis and testing were conducted in support of the design process, including testing air revitalization, water reclamation and management hardware, and certain nonregenerative systems. The activities described herein were approved in task agreements between MSFC and NASA Headquarters Space Station Program Management Office and their prime contractor for the ISS, Boeing. These MSFC activities are in line to the designing, development, testing, and flight of ECLSS equipment planned by Boeing. MSFC's unique capabilities for performing integrated systems testing and analyses, and its ability to perform some tasks cheaper and faster to support ISS program needs, are the basis for the TTA activities.

  12. Plan before You Play: An Activity for Teaching the Managerial Process

    ERIC Educational Resources Information Center

    Althouse, Norm R.; Hedges, Peggy L.

    2015-01-01

    This article describes a 60-minute classroom activity using LEGO® bricks that demonstrates and reinforces the importance of the managerial process. The activity, Plan Before You Play (PBP), is targeted to introductory business classes, and differs from others in that it requires little investment or up-front planning, is easily scalable, and, with…

  13. Planning for land use and conservation: Assessing GIS-based conservation software for land use planning

    Treesearch

    Rob Baldwin; Ryan Scherzinger; Don Lipscomb; Miranda Mockrin; Susan Stein

    2014-01-01

    Recent advances in planning and ecological software make it possible to conduct highly technical analyses to prioritize conservation investments and inform local land use planning. We review these tools, termed conservation planning tools, and assess the knowledge of a key set of potential users: the land use planning community. We grouped several conservation software...

  14. Engineering and Industrial Fields. Revised Summary Report: Technical Employment in Northeast Florida.

    ERIC Educational Resources Information Center

    Baker, William E.; And Others

    The document is one of five summary reports, all part of a Pre-Technical Curriculum Planning Project for secondary students who aspire to technical employment or post secondary technical education. This report represents the results of an assessment of the northeast Florida area's technical occupations in engineering and industrial fields. A…

  15. Agriculture and Related Businesses. Revised Summary Report: Technical Employment in Northeast Florida.

    ERIC Educational Resources Information Center

    Baker, William E.; And Others

    The document is one of five summary reports, all part of a Pre-Technical Curriculum Planning Project for secondary students who aspire to technical employment or post secondary technical education. This report represents the results of an assessment of the northeast Florida area's technical occupations in agriculture and related businesses. A…

  16. Practice It: Create a Weekly Activity Plan

    Cancer.gov

    At the beginning of the week, create an activity plan to help you reach your goals. Start by identifying your goals for the week. Based on your goals, write down when you are going to exercise and what you are going to do.

  17. ISO Technical Specification for the Ionosphere -IRI Recent Activities

    NASA Astrophysics Data System (ADS)

    Bilitza, Dieter; Reinisch, Bodo; Tamara, Gulyaeva

    ISO Technical Specification TS 16457 recommends the International Reference Ionosphere (IRI) for the specification of ionospheric densities and temperatures. We review the latest develop-ments towards improving the IRI model and the newest version of the model IRI-2010. IRI-2010 includes several important improvements and additions. This presentation introduces these changes and discusses their benefits. The changes affect primarily the density profiles in the bottomside ionosphere and the density and height of the F2 peak, the point of highest density in the ionosphere. An important new addition to the model is the inclusion of auroral boundaries and their movement with magnetic activity. We will also discuss the status of other ongoing IRI activities and some of the recent applications of the IRI model. The homepage for the IRI project is at http://IRI.gsfc.nasa.gov/.

  18. 25 CFR 1000.65 - What kinds of activities do planning and negotiation grants support?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 2 2012-04-01 2012-04-01 false What kinds of activities do planning and negotiation... INDIAN SELF-DETERMINATION AND EDUCATION ACT Other Financial Assistance for Planning and Negotiation... planning and negotiation grants support? The planning and negotiation grants support activities such as...

  19. 25 CFR 1000.65 - What kinds of activities do planning and negotiation grants support?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false What kinds of activities do planning and negotiation... INDIAN SELF-DETERMINATION AND EDUCATION ACT Other Financial Assistance for Planning and Negotiation... planning and negotiation grants support? The planning and negotiation grants support activities such as...

  20. 25 CFR 1000.65 - What kinds of activities do planning and negotiation grants support?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 2 2014-04-01 2014-04-01 false What kinds of activities do planning and negotiation... INDIAN SELF-DETERMINATION AND EDUCATION ACT Other Financial Assistance for Planning and Negotiation... planning and negotiation grants support? The planning and negotiation grants support activities such as...

  1. 25 CFR 1000.65 - What kinds of activities do planning and negotiation grants support?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 2 2011-04-01 2011-04-01 false What kinds of activities do planning and negotiation... INDIAN SELF-DETERMINATION AND EDUCATION ACT Other Financial Assistance for Planning and Negotiation... planning and negotiation grants support? The planning and negotiation grants support activities such as...

  2. 25 CFR 1000.65 - What kinds of activities do planning and negotiation grants support?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 2 2013-04-01 2013-04-01 false What kinds of activities do planning and negotiation... INDIAN SELF-DETERMINATION AND EDUCATION ACT Other Financial Assistance for Planning and Negotiation... planning and negotiation grants support? The planning and negotiation grants support activities such as...

  3. Writing Clinic for Business and Technical Writers.

    ERIC Educational Resources Information Center

    Mercer County Community Coll., Trenton, NJ.

    This document offers brief lesson plans for four courses: (1) an 8-hour refresher course for employees who write memos, short reports, and letters; (2) an 8-hour refresher course on creating a short document; (3) a 16-hour course on technical manual writing; and (4) an 8-hour course on technical manual writing. The courses were part of a workplace…

  4. Stages of Concern Profiles for Active Learning Strategies of Agricultural Technical School Teachers in Egypt

    ERIC Educational Resources Information Center

    Myers, Brian E.; Barrick, R. Kirby; Samy, Mohamed M.

    2012-01-01

    Purpose: The purpose of the study was to assess Egyptian Agricultural Technical School (ATS) teachers' implementation of active learning strategies in their classrooms. Methods: The Stages of Concern Questionnaire was administered to 230 participants in active learning workshops. After eliminating headmasters, supervisors and people no longer…

  5. Staff Considerations in Technical Services: The Chameleon Approach.

    ERIC Educational Resources Information Center

    Foster, Constance L.

    1988-01-01

    Discusses the need to cope effectively with technological transitions in library technical services and to plan for successful staff development. The areas discussed include changing job skills, financial planning, ergonomics, innovative partnerships, training, and an emphasis on human resources development. (21 references) (Author/CLB)

  6. Report on active and planned spacecraft and experiments

    NASA Technical Reports Server (NTRS)

    Schofield, N. J., Jr.; Littlefield, R. G.; Elsen, M. F.

    1985-01-01

    This report provides the professional community with information on current and planned spacecraft activity (including both free-flying spacecraft and Shuttle-attached payloads) for a broad range of scientific disciplines. By providing a brief description of each spacecraft and experiment as well as its current status, it is hoped that this document will be useful to many people interested in the scientific, applied, and operational uses of the data collected. Furthermore, for those investigators who are planning or coordinating future observational programs employing a number of different techniques such as rockets, balloons, aircraft, ships, and buoys, this document can provide some insight into the contributions that may be provided by orbiting instruments. The document includes information concerning active and planned spacecraft and experiments. The information covers a wide range of scientific disciplines: astronomy, earth sciences, meteorology, planetary sciences, aeronomy, particles and fields, solar physics, life sciences, and material sciences. These spacecraft projects represent the efforts and funding of individual countries, as well as cooperative arrangements among different countries.

  7. Savannah River Site Approved Site Treatment Plan, 2001 Annual Update (Volumes I and II)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lawrence, B.

    2001-04-30

    The Compliance Plan Volume (Volume I) identifies project activity scheduled milestones for achieving compliance with Land Disposal Restrictions. Information regarding the technical evaluation of treatment options for SRS mixed wastes is contained in the Background Volume (Volume II) and is provided for information.

  8. Tank waste remediation system configuration management implementation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vann, J.M.

    1998-03-31

    The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from themore » life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program.« less

  9. 13 CFR 313.5 - Technical assistance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... technical assistance to: (1) Diversify and strengthen the economy in the Impacted Community; (2) Identify...; and (3) Develop or update a Strategic Plan in accordance with § 313.6 to address economic adjustment...

  10. Institutional Long Range Planning.

    ERIC Educational Resources Information Center

    Caldwell Community Coll. and Technical Inst., Lenoir, NC.

    Long-range institutional planning has been in effect at Caldwell Community College and Technical Institute since 1973. The first step in the process was the identification of planning areas: administration, organization, educational programs, learning resources, student services, faculty, facilities, maintenance/operation, and finances. The major…

  11. Flight data file: STS-4 crew activity plan

    NASA Technical Reports Server (NTRS)

    Pippert, E. B., Jr.

    1982-01-01

    The STS-4 Crew Activity Plan contains the on-orbit timeline, which is a flight data file article. Various time scales such as Mission Elapsed Time (MET), Greenwich Mean Time (GMT), and time until deorbit ignition as well as crew activities, day/night, orbit position, ground tracking, communication coverage, attitude, and maneuvers are presented in chart form.

  12. Technical Assistance for Arts Facilities: A Sourcebook. A Report.

    ERIC Educational Resources Information Center

    Educational Facilities Labs., Inc., New York, NY.

    This booklet is a directory of sources of technical assistance on problems relating to physical facilities for arts organizations. Wherever possible, agencies and organizations are described in their own words. Technical assistance in the area of physical facilities encompasses planning, financing, acquiring, renovating, designing, and maintaining…

  13. Yakima/Klickitat Fisheries Project; Washington Department of Fish and Wildlife Policy/Technical Involvement and Planning, 2001-2002 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Easterbrooks, John A.; Pearsons, Todd N.

    2003-03-01

    Department of Fish and Wildlife (WDFW). The functions of the parties are described in an MOU between the YN and the WDFW. A Scientific and Technical Advisory Committee (STAC) consisting of one representative from each management entity reports to the Policy Group and provides technical input on policy and other issues. Additional committee's, such as the Monitoring Implementation and Planning Team (MIPT), serve as the discretion of STAC. The Policy Group and STAC meet periodically (usually monthly) to conduct the business of the YKFP. Although the YKFP is an all stocks initiative (BPA 1996), most effort to date has been directed at spring chinook salmon and coho salmon. This report is a compilation of the year's activities between August 1, 2001 and July 31, 2002. All findings should be considered preliminary until data collection is completed or the information is published in a peer-reviewed journal.« less

  14. Housing, health and master planning: rules of engagement.

    PubMed

    Harris, P; Haigh, F; Thornell, M; Molloy, L; Sainsbury, P

    2014-04-01

    Knowledge about health focussed policy collaboration to date has been either tactical or technical. This article focusses on both technical and tactical issues to describe the experience of cross-sectoral collaboration between health and housing stakeholders across the life of a housing master plan, including but not limited to a health impact assessment (HIA). A single explanatory case study of collaboration on a master plan to regenerate a deprived housing estate in Western Sydney was developed to explain why and how the collaboration worked or did not work. Data collection included stakeholder interviews, document review, and reflections by the health team. Following a realist approach, data was analysed against established public policy theory dimensions. Tactically we did not know what we were doing. Despite our technical knowledge and skills with health focussed processes, particularly HIA, we failed to appreciate complexities inherent in master planning. This limited our ability to provide information at the right points. Eventually however the HIA did provide substantive connections between the master plan and health. We use our analysis to develop technical and tactical rules of engagement for future cross-sectoral collaboration. This case study from the field provides insight for future health focussed policy collaboration. We demonstrate the technical and tactical requirements for future intersectoral policy and planning collaborations, including HIAs, with the housing sector on master planning. The experience also suggested how HIAs can be conducted flexibly alongside policy development rather than at a specific point after a policy is drafted. Copyright © 2014 The Royal Society for Public Health. All rights reserved.

  15. Interpretation and Manipulation in Human Plans. Technical Report No. 317.

    ERIC Educational Resources Information Center

    Newman, Denis; Bruce, Bertram

    Analysis of students' interpretations of a complex episode of social interaction was used to illustrate three features of human plans that distinguish them from robot plans and that form a basis for a theory of the development of social action. The features illustrated are that (1) human plans are social, (2) human plans operate on…

  16. Manifestations of Metacognitive Activity during the Collaborative Planning of Chemistry Practical Investigations

    ERIC Educational Resources Information Center

    Mathabathe, Kgadi Clarrie; Potgieter, Marietjie

    2017-01-01

    This paper elaborates a process followed to characterise manifestations of cognitive regulation during the collaborative planning of chemistry practical investigations. Metacognitive activity was defined as the demonstration of planning, monitoring, control and evaluation of cognitive activities by students while carrying out the chemistry task.…

  17. Minimal-effort planning of active alignment processes for beam-shaping optics

    NASA Astrophysics Data System (ADS)

    Haag, Sebastian; Schranner, Matthias; Müller, Tobias; Zontar, Daniel; Schlette, Christian; Losch, Daniel; Brecher, Christian; Roßmann, Jürgen

    2015-03-01

    In science and industry, the alignment of beam-shaping optics is usually a manual procedure. Many industrial applications utilizing beam-shaping optical systems require more scalable production solutions and therefore effort has been invested in research regarding the automation of optics assembly. In previous works, the authors and other researchers have proven the feasibility of automated alignment of beam-shaping optics such as collimation lenses or homogenization optics. Nevertheless, the planning efforts as well as additional knowledge from the fields of automation and control required for such alignment processes are immense. This paper presents a novel approach of planning active alignment processes of beam-shaping optics with the focus of minimizing the planning efforts for active alignment. The approach utilizes optical simulation and the genetic programming paradigm from computer science for automatically extracting features from a simulated data basis with a high correlation coefficient regarding the individual degrees of freedom of alignment. The strategy is capable of finding active alignment strategies that can be executed by an automated assembly system. The paper presents a tool making the algorithm available to end-users and it discusses the results of planning the active alignment of the well-known assembly of a fast-axis collimator. The paper concludes with an outlook on the transferability to other use cases such as application specific intensity distributions which will benefit from reduced planning efforts.

  18. Training and technical assistance for compliance with beverage and physical activity components of New York City's regulations for early child care centers.

    PubMed

    Kakietek, Jakub; Dunn, Lillian; O'Dell, Sarah Abood; Jernigan, Jan; Kettel Khan, Laura

    2014-10-16

    In 2006, the New York City Department of Health and Mental Hygiene (DOHMH) passed regulations for child care centers that established standards for beverages provided to children and set a minimum amount of time for daily physical activity. DOHMH offered several types of training and technical assistance to support compliance with the regulations. This article analyzes the association between training and technical assistance provided and compliance with the regulations in a sample of 174 group child care centers. Compliance was measured by using a site inventory of beverages stored on premises and a survey of centers' teachers regarding the amount of physical activity provided. Training and technical assistance measures were based on the DOHMH records of training and technical assistance provided to the centers in the sample and on a survey of center directors. Ordinal logistic regression was used to assess the association between training and technical assistance measures and compliance with the regulations. Measures of training related to physical activity the center received: the number of staff members who participated in Sport, Play and Active Recreation for Kids (SPARK) and other training programs in which a center participated were associated with better compliance with the physical activity regulations. Neither training nor technical assistance were associated with compliance with the regulations related to beverages. Increased compliance with regulations pertaining to physical activity was not related to compliance with beverage regulations. Future trainings should be targeted to the specific regulation requirements to increase compliance.

  19. 76 FR 45589 - Notice of Submission of Proposed Information Collection to OMB; Application for Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-29

    ...: Application for Technical Assistance for Community Planning and Development (CPD) Programs. OMB Approval... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5480-N-71] Notice of Submission of Proposed Information Collection to OMB; Application for Technical Assistance for Community Planning and...

  20. Evaluation of scheduling techniques for payload activity planning

    NASA Technical Reports Server (NTRS)

    Bullington, Stanley F.

    1991-01-01

    Two tasks related to payload activity planning and scheduling were performed. The first task involved making a comparison of space mission activity scheduling problems with production scheduling problems. The second task consisted of a statistical analysis of the output of runs of the Experiment Scheduling Program (ESP). Details of the work which was performed on these two tasks are presented.

  1. A combined planning and self-efficacy intervention to promote physical activity: a multiple mediation analysis.

    PubMed

    Koring, Milena; Richert, Jana; Parschau, Linda; Ernsting, Anna; Lippke, Sonia; Schwarzer, Ralf

    2012-01-01

    Many individuals are motivated to improve their physical activity levels, but often fail to act upon their intention. Interventions fostering volitional strategies, such as action planning, coping planning, and self-efficacy beliefs, can help to translate intentions into behavior. This study examines the effectiveness and the mechanisms of a combined planning and self-efficacy intervention to promote physical activity among motivated individuals. Participants (N = 883) were randomly assigned to the intervention or to a waiting-list control condition. Multivariate analysis of variance revealed that the intervention resulted in significantly more physical activity, higher levels of action planning, coping planning, and volitional self-efficacy beliefs (p < 0.01). In addition, multiple mediation analysis showed that action planning, coping planning, and volitional self-efficacy mediate between the intervention and physical activity. The study shows that the intervention successfully fostered physical activity and unfolds the underlying self-regulatory mechanisms of the intervention's effectiveness.

  2. 32 CFR 644.8 - Planning and scheduling real estate activities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) REAL PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.8 Planning and scheduling... Memoranda; determination of final project boundaries; and preliminary real estate work to the point where... estate activities of the Corps are extremely sensitive, since they disrupt the lives of individuals and...

  3. A Retrospective on Educational Planning in Comparative Education.

    ERIC Educational Resources Information Center

    Farrell, Joseph P.

    1997-01-01

    Defines and broadly traces the history of educational planning in both developing and industrialized capitalist nations. Discusses general approaches to educational planning (technical versus political planning, top-down versus bottom-up planning, and various theoretical bases); the contingency view of planning; case examples of planned,…

  4. School Travel Planning: Mobilizing School and Community Resources to Encourage Active School Transportation

    ERIC Educational Resources Information Center

    Buliung, Ron; Faulkner, Guy; Beesley, Theresa; Kennedy, Jacky

    2011-01-01

    Background: Active school transport (AST), school travel using an active mode like walking, may be important to children's overall physical activity. A "school travel plan" (STP) documents a school's transport characteristics and provides an action plan to address school and neighborhood barriers to AST. Methods: We conducted a pilot STP…

  5. Non-technical skills assessment in surgery.

    PubMed

    Sharma, Bharat; Mishra, Amit; Aggarwal, Rajesh; Grantcharov, Teodor P

    2011-09-01

    Adverse events in surgery have highlighted the importance of non-technical skills, such as communication, decision-making, teamwork, situational awareness and leadership, to effective organizational performance. These skills carry particular importance to surgical oncology, as members of a multidisciplinary team must work cohesively to formulate effective patient care plans. Several non-technical skills evaluation tools have been developed for use in surgery, without adequate comparison and consensus on which should be standard for training. Eleven articles describing the use of three non-technical evaluation tools related to surgery: NOTSS (Non Technical Skills for Surgeons), NOTECHS (Non Technical Skills) and OTAS (Observational Teamwork Assessment for Surgery) were analyzed with respect to scale formulation, validity, reliability and feasibility. Furthermore, their use in training thus far and the future of non-technical rating scales in surgical curricula was discussed. Future work should focus on incorporating these assessment tools into training and into a real operating room setting to provide formative evaluations for surgical residents. Copyright © 2010 Elsevier Ltd. All rights reserved.

  6. Connected commercial vehicles-integrated truck project : vehicle build and build test plan, final technical report.

    DOT National Transportation Integrated Search

    2000-12-01

    This paper brings together the findings of activities that addressed the impacts of nontechnical barriers and constraints that might impede the progress of Intelligent Transportation Systems (ITS) programs. It discusses how the planning and deploymen...

  7. Power Extension Package (PEP) system definition extension, orbital service module systems analysis study. Volume 10: PEP project plan

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Contents: project plan summary; project and mission objectives; related studies and technology support activities; technical summary; management; procurement approach; project definition items and schedule; resources; management review; controlled items; and safety, reliability, and quality assurance.

  8. Measuring polio immunity to plan immunization activities.

    PubMed

    Voorman, Arend; Lyons, Hil M

    2016-11-21

    The Global Polio Eradication Initiative is closer than ever to achieving a polio-free world. Immunization activities must still be carried out in non-endemic countries to maintain population immunity at levels which will stop poliovirus from spreading if it is re-introduced from still-infected areas. In areas where there is no active transmission of poliovirus, programs must rely on surrogate indicators of population immunity to determine the appropriate immunization activities, typically caregiver-reported vaccination history obtained from non-polio acute flaccid paralysis patients identified through polio surveillance. We used regression models to examine the relationship between polio vaccination campaigns and caregiver-reported polio vaccination history. We find that in many countries, vaccination campaigns have a surprisingly weak impact on these commonly used indicators. We conclude that alternative criteria and data, such as routine immunization indicators from vaccination records or household surveys, should be considered for planning polio vaccination campaigns, and that validation of such surrogate indicators is necessary if they are to be used as the basis for program planning and risk assessment. We recommend that the GPEI and similar organizations consider or continue devoting additional resources to rigorously study population immunity and campaign effectiveness in at-risk countries. Copyright © 2016 The Authors. Published by Elsevier Ltd.. All rights reserved.

  9. The Myth of Employee Planning for Retirement

    ERIC Educational Resources Information Center

    Morrison, Malcolm H.

    1975-01-01

    A survey of male hourly-wage earners indicates employees face serious problems in planning for income security in retirement. Retirement preparation programs that supply information and technical planning expertise are needed to assist employees in realistic retirement planning. (EA)

  10. Data-driven planning of distributed energy resources amidst socio-technical complexities

    NASA Astrophysics Data System (ADS)

    Jain, Rishee K.; Qin, Junjie; Rajagopal, Ram

    2017-08-01

    New distributed energy resources (DER) are rapidly replacing centralized power generation due to their environmental, economic and resiliency benefits. Previous analyses of DER systems have been limited in their ability to account for socio-technical complexities, such as intermittent supply, heterogeneous demand and balance-of-system cost dynamics. Here we develop ReMatch, an interdisciplinary modelling framework, spanning engineering, consumer behaviour and data science, and apply it to 10,000 consumers in California, USA. Our results show that deploying DER would yield nearly a 50% reduction in the levelized cost of electricity (LCOE) over the status quo even after accounting for socio-technical complexities. We abstract a detailed matching of consumers to DER infrastructure from our results and discuss how this matching can facilitate the development of smart and targeted renewable energy policies, programmes and incentives. Our findings point to the large-scale economic and technical feasibility of DER and underscore the pertinent role DER can play in achieving sustainable energy goals.

  11. Test, Control and Monitor System (TCMS) operations plan

    NASA Technical Reports Server (NTRS)

    Macfarlane, C. K.; Conroy, M. P.

    1993-01-01

    The purpose is to provide a clear understanding of the Test, Control and Monitor System (TCMS) operating environment and to describe the method of operations for TCMS. TCMS is a complex and sophisticated checkout system focused on support of the Space Station Freedom Program (SSFP) and related activities. An understanding of the TCMS operating environment is provided and operational responsibilities are defined. NASA and the Payload Ground Operations Contractor (PGOC) will use it as a guide to manage the operation of the TCMS computer systems and associated networks and workstations. All TCMS operational functions are examined. Other plans and detailed operating procedures relating to an individual operational function are referenced within this plan. This plan augments existing Technical Support Management Directives (TSMD's), Standard Practices, and other management documentation which will be followed where applicable.

  12. Software verification plan for GCS. [guidance and control software

    NASA Technical Reports Server (NTRS)

    Dent, Leslie A.; Shagnea, Anita M.; Hayhurst, Kelly J.

    1990-01-01

    This verification plan is written as part of an experiment designed to study the fundamental characteristics of the software failure process. The experiment will be conducted using several implementations of software that were produced according to industry-standard guidelines, namely the Radio Technical Commission for Aeronautics RTCA/DO-178A guidelines, Software Consideration in Airborne Systems and Equipment Certification, for the development of flight software. This plan fulfills the DO-178A requirements for providing instructions on the testing of each implementation of software. The plan details the verification activities to be performed at each phase in the development process, contains a step by step description of the testing procedures, and discusses all of the tools used throughout the verification process.

  13. Panel to review EOSDIS plans

    NASA Technical Reports Server (NTRS)

    1994-01-01

    Formed in Jan. 1992, the Panel to Review EOSDIS Plans was charged with advising NASA on its plans for developing the Earth Observing System (EOS) Data and Information System (EOSDIS). Specifically, the panel was asked to do the following: assess the validity of the engineering and technical underpinnings of the EOSDIS; assess its potential value to scientific users; suggest how technical risk can be minimized; and assess whether current plans are sufficiently resilient to be adaptable to changing technology and requirements such as budget environments, data volumes, new users, and new databases. The panel completed an interim report (Addendum A) and transmitted it to NASA and other interested parties in the government on 9 Apr. 1992. Because of a delay in NASA's plans to select the contractor for EOSDIS, the panel was not able to complete its review of the program according to the original government request. With the issuance of a letter report (Addendum B) on 28 Sep. 1992, the panel became inactive until such time as NASA could release the details of the contractor's proposed architecture, schedule, and costs for developing EOSDIS. In early 1993, NASA awarded the contract for the EOSDIS Core System (ECS). On 20 Apr. 1993, NASA asked the panel to reconvene to do the following: ( 1) complete its review of NASA's approach to the EOSDIS architecture and implementation; (2) appraise NASA's responses to the panel's previous recommendations; and (3) review the planning for EOSDIS in the context of NASA's role in the Global Change Data and Information System (GCDIS) implementation plan. To respond to the NASA charge, the panel met three times in 1993 including sessions with NASA officials and the EOSDIS contractor. In addition, several of the panel members visited individual Distributed Active Archive Centers (DAAC's) to obtain additional views of EOSDIS. The panel has now obtained substantial information on the EOSDIS budget, contractor work program, and current

  14. Virtual reality system for planning minimally invasive neurosurgery. Technical note.

    PubMed

    Stadie, Axel Thomas; Kockro, Ralf Alfons; Reisch, Robert; Tropine, Andrei; Boor, Stephan; Stoeter, Peter; Perneczky, Axel

    2008-02-01

    The authors report on their experience with a 3D virtual reality system for planning minimally invasive neurosurgical procedures. Between October 2002 and April 2006, the authors used the Dextroscope (Volume Interactions, Ltd.) to plan neurosurgical procedures in 106 patients, including 100 with intracranial and 6 with spinal lesions. The planning was performed 1 to 3 days preoperatively, and in 12 cases, 3D prints of the planning procedure were taken into the operating room. A questionnaire was completed by the neurosurgeon after the planning procedure. After a short period of acclimatization, the system proved easy to operate and is currently used routinely for preoperative planning of difficult cases at the authors' institution. It was felt that working with a virtual reality multimodal model of the patient significantly improved surgical planning. The pathoanatomy in individual patients could easily be understood in great detail, enabling the authors to determine the surgical trajectory precisely and in the most minimally invasive way. The authors found the preoperative 3D model to be in high concordance with intraoperative conditions; the resulting intraoperative "déjà-vu" feeling enhanced surgical confidence. In all procedures planned with the Dextroscope, the chosen surgical strategy proved to be the correct choice. Three-dimensional virtual reality models of a patient allow quick and easy understanding of complex intracranial lesions.

  15. Guidelines for Establishing and Evaluating High School Technical Electromechanics Programs.

    ERIC Educational Resources Information Center

    Florida State Dept. of Education, Tallahassee. Div. of Vocational, Technical and Adult Education.

    Educators and industrial representatives developed these guidelines for school officials, instructors in technical education, and program and facility planners to use in planning a high school program in technical electromechanics. Designed to train students for entry into industry in applied electromechanics, the program includes electricity,…

  16. Evaluating SPP/APR Improvement Activities

    ERIC Educational Resources Information Center

    National Early Childhood Technical Assistance Center (NECTAC), 2009

    2009-01-01

    This document is intended to assist State Education Agency (SEA) and Lead Agency (LA) staff and technical assistance providers in designing a meaningful evaluation for the State Performance Plan (SPP)/Annual Performance Report (APR) improvement activities. It provides: (1) information about the relevance of evaluation in the context of improvement…

  17. Technical Report on Tele-Communications.

    ERIC Educational Resources Information Center

    San Mateo County PACE Center, Redwood City, CA.

    To provide background material for those interested in tele-communication in education and for those planning to implement such programs in their schools, a research study was conducted to gather information from a variety of sources including educational and technical experts, conference participation, visits to schools conducting projects, and…

  18. Quality-Assurance Plan for Water-Quality Activities in the USGS Ohio Water Science Center

    USGS Publications Warehouse

    Francy, Donna S.; Shaffer, Kimberly H.

    2008-01-01

    In accordance with guidelines set forth by the Office of Water Quality in the Water Resources Discipline of the U.S. Geological Survey, a quality-assurance plan has been written for use by the Ohio Water Science Center in conducting water-quality activities. This quality-assurance plan documents the standards, policies, and procedures used by the Ohio Water Science Center for activities related to the collection, processing, storage, analysis, and publication of water-quality data. The policies and procedures documented in this quality-assurance plan for water-quality activities are meant to complement the Ohio Water Science Center quality-assurance plans for water-quality monitors, the microbiology laboratory, and surface-water and ground-water activities.

  19. Quality Assurance Project Plan - Modeling the Impact of Hydraulic Fracturing on Water Resources Based on Water Acquisition Scenarios

    EPA Pesticide Factsheets

    This planning document describes the quality assurance/quality control activities and technical requirements that will be used during the research study. The goal of this project is to evaluate the potential impacts of large volume water withdrawals.

  20. Self-Efficacy and Planning as Predictors of Physical Activity in the Context of Workplace Health Promotion.

    PubMed

    Keller, Jan; Gellert, Paul; Knoll, Nina; Schneider, Michael; Ernsting, Anna

    2016-11-01

    Fostering self-efficacy and planning in individuals can support the uptake and maintenance of regular physical activity. This study examined self-efficacy and planning as mechanisms of an online-delivered workplace health promotion intervention to enhance employees' physical activity. A special focus lay on reciprocal interrelations among self-efficacy and planning over time, as previous work predominantly accounted for only one predictive direction at a time. Data from N = 1,063 employees of a pharmaceutical company who reported an intention to increase their physical activity levels were assessed at three measurement points up to 12 weeks following the intervention. Cross-lagged panel analyses were performed to examine effects of self-efficacy and planning on physical activity as well as reciprocal interrelations between self-efficacy and planning. Findings indicated an increase in self-efficacy, planning, and physical activity following the intervention. Planning was consistently linked to subsequent physical activity, whereas self-efficacy was not associated. Also, reciprocal interrelations among self-efficacy and planning were found across both measurement lags. Planning was confirmed as a predictor of physical activity, whereas self-efficacy was not. However, cross-lagged interrelations indicated reciprocal reactivation among self-efficacy and planning over time, suggesting beneficial effects of including strategies that foster both volitional constructs in interventions. © 2016 The International Association of Applied Psychology.

  1. National Action Plan on Superconductivity Research and Development

    NASA Astrophysics Data System (ADS)

    1989-12-01

    The Superconductivity Action Plan pursuant to the Superconductivity and Competitiveness Act of 1988 is presented. The plan draws upon contributions from leaders in the technical community of the Federal Government responsible for research and development in superconductivity programs, as well as from the report of the Committee to Advise the President on Superconductivity. Input from leaders in the private sector was obtained during the formulation and review of the plan. Some contents: Coordination of the plan; Technical areas (high temperature superconductivity materials in general, high temperature superconductivity films for sensors and electronics, magnets, large area high temperature superconductivity films, bulk conductors); and Policy areas.

  2. Science and Engineering Technical Assessments (SETA) Program

    NASA Technical Reports Server (NTRS)

    Huy, Frank

    2000-01-01

    This document provides a project plan for the D.N. American response to Modification #1 to Contract Task Order #13 - Program Maintenance and Logistics for the Science and Engineering Technical Assessments (SETA) contract.

  3. Academic Unit Planning and Management. Technical Report No. 75.

    ERIC Educational Resources Information Center

    Miyataki, Glenn K.; Byers, Maureen L.

    Intended to provide a systematic aid for planning and managing academic units (schools, colleges, departments, or divisions) within an institution, the Academic Unit Planning and Management (AUPM) manual consists of a multifaceted set of techniques and procedures that can be used by academic unit administrators. Data regarding academic unit…

  4. Self-efficacy, planning, and preparatory behaviours as joint predictors of physical activity: A conditional process analysis.

    PubMed

    Barz, Milena; Lange, Daniela; Parschau, Linda; Lonsdale, Chris; Knoll, Nina; Schwarzer, Ralf

    2016-01-01

    Planning can bridge the gap between intentions and action, but what bridges the gap between planning and action? This study helps to answer the question by disentangling the interrelationships between self-efficacy, planning and preparatory behaviours in predicting physical activity. Preparatory behaviours are tested as a working mechanism of planning. Moreover, it is tested whether the utility of preparatory behaviours depends on an individual's level of self-efficacy. A survey assessed planning, self-efficacy and preparatory behaviours for physical activity. Adults (N = 166) provided data at two measurement points. In a longitudinal model, preparatory behaviours were specified as a mediator between planning and physical activity. Self-efficacy was specified as a possible moderator at two points in the model. Preparatory behaviours mediated the relationship between planning and physical activity. An interaction between self-efficacy and preparatory behaviours on physical activity was found, indicating that individuals with low self-efficacy beliefs were more active if they engaged more frequently in preparatory behaviours. Planning seems to stimulate preparatory behaviours, which in turn make future physical activity more likely. Furthermore, as performing preparatory behaviours represent a step forward towards the enactment of behavioural goals, preparatory behaviours may be particular beneficial for individuals afflicted by self-doubts regarding physical activity.

  5. Succession Planning in a Two-Year Technical College System

    ERIC Educational Resources Information Center

    Neefe, Diane Osterhaus

    2009-01-01

    The study explores the organizational characteristics of strategic planning, succession planning and career management and the processes impact on the hiring location of academic leaders from within the college, external to the college but within the system, and external to the system. The study was conducted in the 16 college Wisconsin…

  6. 44 CFR 352.24 - Provision of technical assistance and Federal facilities and resources.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Provision of technical... PLANTS: EMERGENCY PREPAREDNESS PLANNING Federal Participation § 352.24 Provision of technical assistance... technical assistance to the licensee. Such assistance may be provided during the pendency of an appeal under...

  7. IMPLICATIONS OF WOMEN'S WORK PATTERNS FOR PROGRAM DEVELOPMENT IN VOCATIONAL AND TECHNICAL EDUCATION.

    ERIC Educational Resources Information Center

    LEE, SYLVIA L.; AND OTHERS

    THE IMPLICATIONS OF WOMEN'S LABOR FORCE PARTICIPATION FOR EDUCATORS AND LEADERS PLANNING PROGRAMS IN VOCATIONAL AND TECHNICAL EDUCATION WERE DERIVED AT A 2-DAY CONFERENCE BY 30 PEOPLE REPRESENTING THE VARIOUS SERVICES IN VOCATIONAL-TECHNICAL EDUCATION AND RELATED AREAS. IMPLICATIONS AND RECOMMENDATIONS FOR VOCATIONAL AND TECHNICAL EDUCATION…

  8. Colonialism and Secondary Technical Education in Hong Kong: 1945-1997

    ERIC Educational Resources Information Center

    Lau, Wai Wah; Kan, Flora

    2011-01-01

    This study examines the influence of the colonial experience (1945-1997) on the planning of secondary technical education in Hong Kong. Specifically, the origins of secondary technical institutions and their positioning in secondary education are examined. Primary source materials are used as the basis of investigation and analysis, supplemented…

  9. Lawrence Berkeley Laboratory, Institutional Plan FY 1994--1999

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-09-01

    The Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. For FY 1994-1999 the Institutional Plan reflects significant revisions based on the Laboratory`s strategic planning process. The Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory, and the resources required for their implementation. The Scientific and Technical Programs section summarizesmore » current programs and potential changes in research program activity. The Environment, Safety, and Health section describes the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation`s scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff diversity and development program. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The new section on Information Resources reflects the importance of computing and communication resources to the Laboratory. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy`s strategic planning activities, developed through an annual planning process.« less

  10. IDC Integrated Master Plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clifford, David J.; Harris, James M.

    2014-12-01

    This is the IDC Re-Engineering Phase 2 project Integrated Master Plan (IMP). The IMP presents the major accomplishments planned over time to re-engineer the IDC system. The IMP and the associate Integrated Master Schedule (IMS) are used for planning, scheduling, executing, and tracking the project technical work efforts. REVISIONS Version Date Author/Team Revision Description Authorized by V1.0 12/2014 IDC Re- engineering Project Team Initial delivery M. Harris

  11. Active Canada 20/20: A physical activity plan for Canada.

    PubMed

    Spence, John C; Faulkner, Guy; Costas Bradstreet, Christa; Duggan, Mary; Tremblay, Mark S

    2016-03-16

    Physical inactivity is a pressing public health concern. In this commentary we argue that Canada's approach to increasing physical activity (PA) has been fragmented and has lacked coordination, funding and a strategic approach. We then describe a potential solution in Active Canada 20/20 (AC 20/20), which provides both a national plan and a commitment to action from non-government and public sectors with a view to engaging corporate Canada and the general public. It outlines a road map for initiating, coordinating and implementing proactive initiatives to address this prominent health risk factor. The identified actions are based on the best available evidence and have been endorsed by the majority of representatives in the relevant sectors. The next crucial steps are to engage all those involved in public health promotion, service provision and advocacy at the municipal, provincial and national levels in order to incorporate AC 20/20 principles into practice and planning and thus increase the PA level of every person in Canada. Further, governments, as well as the private, not-for-profit and philanthropic sectors, should demonstrate leadership and continue their efforts toward providing the substantial and sustained resources needed to recalibrate Canadians' habitual PA patterns; this will ultimately improve the overall health of our citizens.

  12. Planning satellite communication services and spectrum-orbit utilization

    NASA Technical Reports Server (NTRS)

    Sawitz, P. H.

    1982-01-01

    The relationship between approaches to planning satellite communication services and spectrum-orbit utilization is considered, with emphasis on the fixed-satellite and the broadcasting-satellite services. It is noted that there are several possible approaches to planning space services, differing principally in the rigidity with which technical parameters are prescribed, in the time for which a plan remains in force, and in the procedures adopted for implementation and modifications. With some planning approaches, spectrum-orbit utilization is fixed at the time the plan is made. Others provide for greater flexibility by making it possible to postpone some decisions on technical parameters. In addition, the two political questions of what is equitable access and how it can be guaranteed in practice play an important role.

  13. Energy materials coordinating committee (EMACC) Fiscal Year 1982. Annual technical report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    1983-03-01

    The DOE Energy Materials Coordinating Committee (EMaCC) serves primarily to enhance coordination among the Department's materials programs and to further the effective use of materials expertise within the Department. These functions are accomplished through the exchange of budgetary and planning information among program managers and through technical meetings/ workshops on selected topics involving both DOE and major contractors. In addition, the EMaCC aids in obtaining materials - related inputs for both intra- and interagency compilations. Membership in the EMaCC is open to any Department organizational unit; participants are appointed by Division or Office Directors. The current membership is listed inmore » Table 1. The EMACC reports to the Director of the Office of Energy Research in his capacity as overseer of the technical programs of the Department. This annual technical report is mandated by the EMACC terms of reference. In this report are described 1) EMACC activities for FY 1982; 2) a summary of materials funding in the Department from FY 1978 to the present; and 3) on-going materials programs in the Department.« less

  14. Summary of energy planning technical support to the Government of Liberia

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Samuels, G.

    1985-06-01

    Subsequent to a general assessment of energy options for Liberia, the principal activities of this program were: (1) an assessment of the economics of wood energy in Liberia; (2) a study of the potential for energy conservation in government buildings; (3) assistance in completing the 1982 Liberian energy balance; and (4) assistance in preparing the National Energy Plan. This report discusses the first three of these activities. A draft of the National Energy Plan was submitted in January 1985 to member agencies of the Liberian National Energy Committee for their review and comments. Liberia used the equivalent of 13.2 millionmore » barrels of crude oil in 1982- 67% from fuel wood, 4% from hydro, and 29% from imported petroleum. The wood was used almost entirely (approx. 99%) by the residential sector. Iron ore mining operations accounted for about 60% of domestic consumption of petroleum products. The transportation sector accounted for another 25%. The energy consumed by the agriculture and forestry sector was less than 2% of domestic consumption and was used primarily for operations of the large rubber plantations and timber concessions. Very little energy was used for food production. Significant energy savings in government buildings would require a major remodeling effort, including replacement of the louvered windows; extensive repairs to close large gaps around windows, air conditioners, and doors; and extensive caulking. The payback period from energy savings would be long. The assessment of the economics of wood energy indicates that wood can probably be delivered to a small rural power plant at costs that make this feedstock highly competitive for some and perhaps most of Liberia's rural electric stations.« less

  15. Formative evaluation of AARP's Active for Life campaign to improve walking and bicycling environments in two cities.

    PubMed

    Emery, James; Crump, Carolyn; Hawkins, Margaret

    2007-10-01

    AARP conducted a 2.5-year social-marketing campaign to improve physical activity levels among older adults in Richmond, Virginia and Madison, Wisconsin. This article presents formative evaluation findings from the campaign's policy/environmental change component. Evaluation data were abstracted from technical-assistance documentation and telephone interviews. Results include 11 policy and 14 environmental changes attained or in-process by campaign closure. Differences between the cities' results are explained through differences in program implementation (e.g., types of changes planned, formalization of partnerships). Project teams took less time deciding to pursue policy change than environmental change; however, planning the policy activities took longer than planning environmental-change activities. Recommendations for future policy/environmental change interventions focus on the selection of strategies; planning for administrative resources; formalizing partnerships to ensure sustainability of impact; ensuring training and technical assistance; and documenting progress. Similar intervention results may be attainable with a multi-year timeframe, adequate part-time coordination, and committed volunteers.

  16. Balancing the health workforce: breaking down overall technical change into factor technical change for labour-an empirical application to the Dutch hospital industry.

    PubMed

    Blank, Jos L T; van Hulst, Bart L

    2017-02-17

    Well-trained, well-distributed and productive health workers are crucial for access to high-quality, cost-effective healthcare. Because neither a shortage nor a surplus of health workers is wanted, policymakers use workforce planning models to get information on future labour markets and adjust policies accordingly. A neglected topic of workforce planning models is productivity growth, which has an effect on future demand for labour. However, calculating productivity growth for specific types of input is not as straightforward as it seems. This study shows how to calculate factor technical change (FTC) for specific types of input. The paper first theoretically derives FTCs from technical change in a consistent manner. FTC differs from a ratio of output and input, in that it deals with the multi-input, multi-output character of the production process in the health sector. Furthermore, it takes into account substitution effects between different inputs. An application of the calculation of FTCs is given for the Dutch hospital industry for the period 2003-2011. A translog cost function is estimated and used to calculate technical change and FTC for individual inputs, especially specific labour inputs. The results show that technical change increased by 2.8% per year in Dutch hospitals during 2003-2011. FTC differs amongst the various inputs. The FTC of nursing personnel increased by 3.2% per year, implying that fewer nurses were needed to let demand meet supply on the labour market. Sensitivity analyses show consistent results for the FTC of nurses. Productivity growth, especially of individual outputs, is a neglected topic in workforce planning models. FTC is a productivity measure that is consistent with technical change and accounts for substitution effects. An application to the Dutch hospital industry shows that the FTC of nursing personnel outpaced technical change during 2003-2011. The optimal input mix changed, resulting in fewer nurses being needed to let

  17. Promoting family planning through women's development.

    PubMed

    Gulhati, K

    1986-12-01

    Private initiatives in developing countries have been successful in increasing women's desire for family planning by enabling them to earn more income. These approaches have incorporated a woman-to-woman strategy in which women train others not only in how to earn an income from producing and marketing products, but also in the skills needed to establish and manage their own organizations. Private voluntary organizations play an especially crucial role in training project managers. The Center for Development and Population Activities, for example, has held 19 Women in Management workshops and channels funds and technical assistance for projects in health, family planning, nutrition, and income generation. Women who move from managerial to policymaking positions are most able to help other women raise their political, social, and economic status.

  18. 40 CFR 52.2586 - Small business stationary source technical and environmental compliance assistance program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... PLANS (CONTINUED) Wisconsin § 52.2586 Small business stationary source technical and environmental compliance assistance program. The Wisconsin small business stationary source technical and environmental...

  19. 40 CFR 52.2586 - Small business stationary source technical and environmental compliance assistance program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PLANS (CONTINUED) Wisconsin § 52.2586 Small business stationary source technical and environmental compliance assistance program. The Wisconsin small business stationary source technical and environmental...

  20. 40 CFR 52.2586 - Small business stationary source technical and environmental compliance assistance program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... PLANS (CONTINUED) Wisconsin § 52.2586 Small business stationary source technical and environmental compliance assistance program. The Wisconsin small business stationary source technical and environmental...

  1. 40 CFR 52.2586 - Small business stationary source technical and environmental compliance assistance program.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... PLANS (CONTINUED) Wisconsin § 52.2586 Small business stationary source technical and environmental compliance assistance program. The Wisconsin small business stationary source technical and environmental...

  2. 40 CFR 52.2586 - Small business stationary source technical and environmental compliance assistance program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PLANS (CONTINUED) Wisconsin § 52.2586 Small business stationary source technical and environmental compliance assistance program. The Wisconsin small business stationary source technical and environmental...

  3. Advances in Distributed Operations and Mission Activity Planning for Mars Surface Exploration

    NASA Technical Reports Server (NTRS)

    Fox, Jason M.; Norris, Jeffrey S.; Powell, Mark W.; Rabe, Kenneth J.; Shams, Khawaja

    2006-01-01

    A centralized mission activity planning system for any long-term mission, such as the Mars Exploration Rover Mission (MER), is completely infeasible due to budget and geographic constraints. A distributed operations system is key to addressing these constraints; therefore, future system and software engineers must focus on the problem of how to provide a secure, reliable, and distributed mission activity planning system. We will explain how Maestro, the next generation mission activity planning system, with its heavy emphasis on portability and distributed operations has been able to meet these design challenges. MER has been an excellent proving ground for Maestro's new approach to distributed operations. The backend that has been developed for Maestro could benefit many future missions by reducing the cost of centralized operations system architecture.

  4. An overview and guide: planning instructional radio.

    PubMed

    Imhoof, M

    1984-03-01

    Successful instructional radio projects require both comprehensive and complex planning. The instructional radio planning team needs to have knowledge and capabilities in several technical, social, and educational areas. Among other skills, the team must understand radio, curriculum design, the subject matter being taught, research and evaluation, and the environment in which the project operates. Once a basic approach to educational planning has been selected and broad educational goals set, radio may be selected as a cost effective means of achieving some of the goals. Assuming radio is a wise choice, there are still several factors which must be analyzed by a team member who is a radio specialist. The most obvious consideration is the inventory and evaluation of the facilities: studios; broadcast, recording, and transmission equipment; classroom radios; and so on. Capabilities of broadcast personnel are another consideration. Initial radio lessons need to teach the learners how to listen to the radio if they have no previous experience with institutional radio broadcasts. A captive, inschool audience ready to listen to radio instructions requires a different use of the medium than a noncaptive audience. With the noncaptive audience, the educational broadcaster must compete with entertaining choices from other media and popular activities and pastimes of the community. The most complex knowledge and analysis required in planning instructional radio concerns the relationship of the content to the medium. Environmental factors are important in planning educational programs. The physical environment may present several constraints on the learning experience and the use of radio. The most obvious is the effect of climate and terrain on the quality of radio reception. The physical environment is easily studied through experience in the target area, but this knowledge plays a significant role in designing effective learning materials for specific learners. Social

  5. Rural planning organizations--their role in transportation planning and project development in Texas : technical report.

    DOT National Transportation Integrated Search

    2010-10-01

    While a formal planning and programming process is established for urbanized areas through Metropolitan : Planning Organizations, no similar requirement has been established for rural areas. Currently, under the : Safe, Accountable, Flexible, Efficie...

  6. Sector activities and lessons learned around initial implementation of the United States national physical activity plan.

    PubMed

    Evenson, Kelly R; Satinsky, Sara B

    2014-08-01

    National plans are increasingly common but infrequently evaluated. The 2010 United States National Physical Activity Plan (NPAP) provided strategies to increase population levels of physical activity. This paper describes (i) the initial accomplishments of the NPAP sector teams, and (ii) results from a process evaluation to determine how the sectors operated, their cross-sector collaboration, challenges encountered, and positive experiences. During 2011, a quarterly reporting system was developed to capture sector-level activities. A year-end interview derived more detailed information. Interviews with 12 sector leads were recorded, transcribed verbatim, and analyzed for common themes. The 6 sectors worked on goals from the implementation plan that focused broadly on education, promotion, intervention, policy, collaboration, and evaluation. Through year-end interviews, themes were generated around operations, goal setting, and cross-sector collaboration. Challenges to the NPAP work included lack of funding and time, the need for marketing and promotion, and organizational support. Positive experiences included collaboration, efficiency of work, enhanced community dynamic, and accomplishments toward NPAP goals. These initial results on the NPAP sector teams can be used as a baseline assessment for future monitoring. The lessons learned may be useful to other practitioners developing evaluations around state- or national-level plans.

  7. Sector Activities and Lessons Learned Around Initial Implementation of the United States National Physical Activity Plan

    PubMed Central

    Evenson, Kelly R.; Satinsky, Sara B.

    2016-01-01

    Background National plans are increasingly common but infrequently evaluated. The 2010 United States National Physical Activity Plan (NPAP) provided strategies to increase population levels of physical activity. This paper describes (i) the initial accomplishments of the NPAP sector teams, and (ii) results from a process evaluation to determine how the sectors operated, their cross-sector collaboration, challenges encountered, and positive experiences. Methods During 2011, a quarterly reporting system was developed to capture sector-level activities. A year-end interview derived more detailed information. Interviews with 12 sector leads were recorded, transcribed verbatim, and analyzed for common themes. Results The 6 sectors worked on goals from the implementation plan that focused broadly on education, promotion, intervention, policy, collaboration, and evaluation. Through year-end interviews, themes were generated around operations, goal setting, and cross-sector collaboration. Challenges to the NPAP work included lack of funding and time, the need for marketing and promotion, and organizational support. Positive experiences included collaboration, efficiency of work, enhanced community dynamic, and accomplishments toward NPAP goals. Conclusions These initial results on the NPAP sector teams can be used as a baseline assessment for future monitoring. The lessons learned may be useful to other practitioners developing evaluations around state- or national-level plans. PMID:24176800

  8. 40 CFR 52.2732 - Small business technical and environmental compliance assistance program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) Puerto Rico § 52.2732 Small business technical and environmental compliance assistance program. On November 16, 1992, the Puerto Rico Environmental Quality Board submitted a plan for the... Assistance Program for incorporation in the Puerto Rico state implementation plan. This plan meets the...

  9. 40 CFR 52.2732 - Small business technical and environmental compliance assistance program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) Puerto Rico § 52.2732 Small business technical and environmental compliance assistance program. On November 16, 1992, the Puerto Rico Environmental Quality Board submitted a plan for the... Assistance Program for incorporation in the Puerto Rico state implementation plan. This plan meets the...

  10. 40 CFR 52.2732 - Small business technical and environmental compliance assistance program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) Puerto Rico § 52.2732 Small business technical and environmental compliance assistance program. On November 16, 1992, the Puerto Rico Environmental Quality Board submitted a plan for the... Assistance Program for incorporation in the Puerto Rico state implementation plan. This plan meets the...

  11. Planning building energy conservation research in the US

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Abel, F.; LaMontagne, J.

    1988-01-01

    In the US, the federal government plays a key role in the development of energy conserving technologies and practices for buildings. The Office of Buildings and Community Systems (BCS) of the US Department of Energy provides federal leadership for both private and public sector activities in building energy conservation. The federal role in recent years has been largely limited to the development of technical options; behavioral and institutional factors are considered only to the extent necessary to inform the research planning process. Planning in the US requires dealing with uncertainties regarding the federal approach to energy conservation; this can change,more » often dramatically, with changes in administrations or changing economic and energy conditions. Thus federal research plans must be designed to be useful in a wide variety of circumstances. 7 refs.« less

  12. NASA Space Sciences Strategic Planning

    NASA Technical Reports Server (NTRS)

    Crane, Philippe

    2004-01-01

    The purpose of strategic planning roadmap is to:Fulfill the strategic planning requirements; Provide a guide to the science community in presenting research requests to NASA; Inform and inspire; Focus investments in technology and research for future missions; and Provide the scientific and technical justification for augmentation requests.

  13. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan. [Contains glossary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This plan covers robotics Research, Development, Demonstration, Testing, activities in the Program for the next five years. These activities range from bench-scale R D to fullscale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and an initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management operations at DOE sites to be safer, faster and cheaper. Fivemore » priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. This 5-Year Program Plan discusses the overall approach to be adopted by the RTDP to aggressively develop robotics technology and contains discussions of the Program Management Plan, Site Visit and Needs Summary, Approach to Needs-Directed Technical Development, Application-Specific Technical Development, and Cross-Cutting and Advanced Technology. Integrating application-specific ER WM needs, the current state of robotics technology, and the potential benefits (in terms of faster, safer, and cheaper) of new technology, the Plan develops application-specific road maps for robotics RDDT E for the period FY 1991 through FY 1995. In addition, the Plan identifies areas where longer-term research in robotics will have a high payoff in the 5- to 20-year time frame. 12 figs.« less

  14. Coosa River Storage Annex, Talladega, Alabama Environmental Investigation, Final Management and Resources Utilization Plan

    DTIC Science & Technology

    1991-02-01

    to adequately assess the health and environmental risks associated with the closure and transfer of the Annex forI other use; and 3) identification of...1990); Draft Final Technical Plan, Draft Final Sampling Design Plan and Draft Final Health and Safety Plan, USATHAMA, June 1990. 2.1.2 Draft Final...Final Technical Plan, Sampling Design Plan and Health and Safety Plan) supplied by USATHAMA. The estimate may be revised, with USATHAMA approval, as

  15. A Feasibility and Engineering Study of Extending Cable TV Programming to Surrounding Communities. Planning Grant Report.

    ERIC Educational Resources Information Center

    Lakeshore Technical Inst., Cleveland, WI.

    This report chronicles planning grant activities undertaken by the Lakeshore Technical Institute (LTI) and documents findings of a study to determine the feasibility and costs of extending public and educational programs from the LTI campus in Cleveland, Wisconsin, to surrounding communities. The geographic service area, regional…

  16. Community Vision and Interagency Alignment: A Community Planning Process to Promote Active Transportation

    PubMed Central

    Chaudhury, Nupur; Kennedy, Patrick; Noyes, Philip; Maybank, Aletha

    2016-01-01

    In 2010, the Brooklyn Active Transportation Community Planning Initiative launched in 2 New York City neighborhoods. Over a 2-year planning period, residents participated in surveys, school and community forums, neighborhood street assessments, and activation events—activities that highlighted the need for safer streets locally. Consensus among residents and key multisectoral stakeholders, including city agencies and community-based organizations, was garnered in support of a planned expansion of bicycling infrastructure. The process of building on community assets and applying a collective impact approach yielded changes in the built environment, attracted new partners and resources, and helped to restore a sense of power among residents. PMID:26959270

  17. Community Vision and Interagency Alignment: A Community Planning Process to Promote Active Transportation.

    PubMed

    DeGregory, Sarah Timmins; Chaudhury, Nupur; Kennedy, Patrick; Noyes, Philip; Maybank, Aletha

    2016-04-01

    In 2010, the Brooklyn Active Transportation Community Planning Initiative launched in 2 New York City neighborhoods. Over a 2-year planning period, residents participated in surveys, school and community forums, neighborhood street assessments, and activation events-activities that highlighted the need for safer streets locally. Consensus among residents and key multisectoral stakeholders, including city agencies and community-based organizations, was garnered in support of a planned expansion of bicycling infrastructure. The process of building on community assets and applying a collective impact approach yielded changes in the built environment, attracted new partners and resources, and helped to restore a sense of power among residents.

  18. Spectrum orbit utilization program technical manual SOUP5 Version 3.8

    NASA Technical Reports Server (NTRS)

    Davidson, J.; Ottey, H. R.; Sawitz, P.; Zusman, F. S.

    1984-01-01

    The underlying engineering and mathematical models as well as the computational methods used by the SOUP5 analysis programs, which are part of the R2BCSAT-83 Broadcast Satellite Computational System, are described. Included are the algorithms used to calculate the technical parameters and references to the relevant technical literature. The system provides the following capabilities: requirements file maintenance, data base maintenance, elliptical satellite beam fitting to service areas, plan synthesis from specified requirements, plan analysis, and report generation/query. Each of these functions are briefly described.

  19. 40 CFR 52.1690 - Small business technical and environmental compliance assistance program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) New York § 52.1690 Small business technical and environmental compliance assistance program. On January 11, 1993, the New York State Department of Environmental Conservation submitted a plan for the... Assistance Program for incorporation in the New York state implementation plan. This plan meets the...

  20. WFIRST: STScI Science Operations Center (SSOC) Activities and Plans

    NASA Astrophysics Data System (ADS)

    Gilbert, Karoline M.; STScI WFIRST Team

    2018-01-01

    The science operations for the WFIRST Mission will be distributed between Goddard Space Flight Center, the Space Telescope Science Institute (STScI), and the Infrared Processing and Analysis Center (IPAC). The STScI Science Operations Center (SSOC) will schedule and archive all WFIRST observations, will calibrate and produce pipeline-reduced data products for the Wide Field Instrument, and will support the astronomical community in planning WFI observations and analyzing WFI data. During the formulation phase, WFIRST team members at STScI have developed operations concepts for scheduling, data management, and the archive; have performed technical studies investigating the impact of WFIRST design choices on data quality and analysis; and have built simulation tools to aid the community in exploring WFIRST’s capabilities. We will highlight examples of each of these efforts.

  1. Using Strategic Planning To Improve Rural Schools.

    ERIC Educational Resources Information Center

    D'Amico, Joseph J.

    This paper describes the elements of strategic planning and applies them to educational reform and improvement. The paper also describes how a planning model, Strategic Planning for Educational Reform and Improvement (SPERI), was used by Rural Assistance Councils (RACs) in Pennsylvania and Delaware, with technical assistance from Research for…

  2. Monitoring and Evaluation Plan for the Nez Perce Tribal Hatchery, 1996 Technical Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Steward, Cleveland R.

    1996-08-01

    The Nez Perce Tribe has proposed to build and operate the Nez Perce Tribal Hatchery (NPTH) in the Clearwater River subbasin of Idaho for the purpose of restoring self-sustaining populations of spring, summer, and fall chinook salmon to their native habitats. The project comprises a combination of incubation and rearing facilities, satellite rearing facilities, juvenile and adult collection sites, and associated production and harvest management activities. As currently conceived, the NPTH program will produce approximately 768,000 spring chinook parr, 800,000 summer chinook fry, and 2,000,000 fall chinook fry on an annual basis. Hatchery fish would be spawned, reared, and releasedmore » under conditions that promote wild-type characteristics, minimize genetic changes in both hatchery and wild chinook populations, and minimize undesirable ecological interactions. The primary objective is to enable hatchery-produced fish to return to reproduce naturally in the streams in which they are released. These and other characteristics of the project are described in further detail in the Nez Perce Tribal Hatchery Master Plan (Larson and Mobrand 1992), the 1995 Supplement to the Master Plan (Johnson et al. 1995), and the Nez Perce Tribal Hatchery Program Environmental Impact Statement (Bonneville Power Administration et al. 1996). The report in hand is referred to in project literature as the NPTH Monitoring and Evaluation (M&E) Plan. This report describes monitoring and evaluation activities that will help NPTH managers determine. whether they were successful in restoring chinook salmon populations and avoiding adverse ecological impacts. Program success will be gauged primarily by changes in the abundance and distribution of supplemented chinook populations. The evaluation of project-related impacts will focus on the biological effects of constructing and operating NPTH hatchery facilities, introducing hatchery fish into the natural environment, and removing or displacing

  3. Science-based strategic planning for hazardous fuel treatment.

    Treesearch

    D.L. Peterson; M.C. Johnson

    2007-01-01

    A scientific foundation coupled with technical support is needed to develop long-term strategic plans for fuel and vegetation treatments on public lands. These plans are developed at several spatial scales and are typically a component of fire management plans and other types of resource management plans. Such plans need to be compatible with national, regional, and...

  4. 24 CFR 570.402 - Technical assistance awards.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... CFR part 571); and the Special Purpose Grants for Insular Areas, Community Development Work Study and... attended by more than one unit of government. (d) Eligible activities. Activities eligible for technical.... Activities for which costs are ineligible under this section include: (1) In the case of technical assistance...

  5. 24 CFR 570.402 - Technical assistance awards.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... CFR part 571); and the Special Purpose Grants for Insular Areas, Community Development Work Study and... attended by more than one unit of government. (d) Eligible activities. Activities eligible for technical.... Activities for which costs are ineligible under this section include: (1) In the case of technical assistance...

  6. Report on Active and Planned Spacecraft and Experiments

    NASA Technical Reports Server (NTRS)

    Vostreys, R. W. (Editor); Maitson, H. H. (Editor)

    1981-01-01

    Active and planned spacecraft activity and experiments between June 1, 1980 and May 31, 1981 known to the National Space Science Data Center are described. The information covers a wide range of disciplines: astronomy, Earth sciences, meteorology, planetary sciences, aeronomy, particles and fields, solar physics, life sciences, and material sciences. Each spacecraft and experiment is described and its current status presented. Descriptions of navigational and communications satellites and of spacecraft that contain only continuous radio beacons used for ionospheric studies are specifically excluded.

  7. Match-to-match variation in physical activity and technical skill measures in professional Australian Football.

    PubMed

    Kempton, Thomas; Sullivan, Courtney; Bilsborough, Johann C; Cordy, Justin; Coutts, Aaron J

    2015-01-01

    To determine the match-to-match variability in physical activity and technical performance measures in Australian Football, and examine the influence of playing position, time of season, and different seasons on these measures of variability. Longitudinal observational study. Global positioning system, accelerometer and technical performance measures (total kicks, handballs, possessions and Champion Data rank) were collected from 33 players competing in the Australian Football League over 31 matches during 2011-2012 (N=511 observations). The global positioning system data were categorised into total distance, mean speed (mmin(-1)), high-speed running (>14.4 kmh(-1)), very high-speed running (>19.9 kmh(-1)), and sprint (>23.0 kmh(-1)) distance while player load was collected from the accelerometer. The data were log transformed to provide coefficient of variation and the between subject standard deviation (expressed as percentages). Match-to-match variability was increased for higher speed activities (high-speed running, very high-speed running, sprint distance, coefficient of variation %: 13.3-28.6%) compared to global measures (speed, total distance, player load, coefficient of variation %: 5.3-9.2%). The between-match variability was relativity stable for all measures between and within AFL seasons, with only few differences between positions. Higher speed activities (high-speed running, very high-speed running, sprint distance), but excluding mean speed, total distance and player load, were all higher in the final third phase of the season compared to the start of the season. While global measures of physical performance are relatively stable, higher-speed activities and technical measures exhibit a large degree of between-match variability in Australian Football. However, these measures remain relatively stable between positions, and within and between Australian Football League seasons. Copyright © 2013 Sports Medicine Australia. Published by Elsevier Ltd

  8. 7 CFR 634.23 - Water quality plan.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 6 2012-01-01 2012-01-01 false Water quality plan. 634.23 Section 634.23 Agriculture... AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Participant RCWP Contracts § 634.23 Water quality plan. (a) The participant's water quality plan, developed with technical assistance by the NRCS or its...

  9. Forest Resource Management Plans: A Sustainability Approach

    ERIC Educational Resources Information Center

    Pile, Lauren S.; Watts, Christine M.; Straka, Thomas J.

    2012-01-01

    Forest Resource Management Plans is the capstone course in many forestry and natural resource management curricula. The management plans are developed by senior forestry students. Early management plans courses were commonly technical exercises, often performed on contrived forest "tracts" on university-owned or other public lands, with a goal of…

  10. 7 CFR 634.23 - Water quality plan.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 6 2014-01-01 2014-01-01 false Water quality plan. 634.23 Section 634.23 Agriculture... AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Participant RCWP Contracts § 634.23 Water quality plan. (a) The participant's water quality plan, developed with technical assistance by the NRCS or its...

  11. 7 CFR 634.23 - Water quality plan.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 6 2013-01-01 2013-01-01 false Water quality plan. 634.23 Section 634.23 Agriculture... AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Participant RCWP Contracts § 634.23 Water quality plan. (a) The participant's water quality plan, developed with technical assistance by the NRCS or its...

  12. Technical Note: Improving the VMERGE treatment planning algorithm for rotational radiotherapy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gaddy, Melissa R., E-mail: mrgaddy@ncsu.edu; Papp,

    2016-07-15

    Purpose: The authors revisit the VMERGE treatment planning algorithm by Craft et al. [“Multicriteria VMAT optimization,” Med. Phys. 39, 686–696 (2012)] for arc therapy planning and propose two changes to the method that are aimed at improving the achieved trade-off between treatment time and plan quality at little additional planning time cost, while retaining other desirable properties of the original algorithm. Methods: The original VMERGE algorithm first computes an “ideal,” high quality but also highly time consuming treatment plan that irradiates the patient from all possible angles in a fine angular grid with a highly modulated beam and then makesmore » this plan deliverable within practical treatment time by an iterative fluence map merging and sequencing algorithm. We propose two changes to this method. First, we regularize the ideal plan obtained in the first step by adding an explicit constraint on treatment time. Second, we propose a different merging criterion that comprises of identifying and merging adjacent maps whose merging results in the least degradation of radiation dose. Results: The effect of both suggested modifications is evaluated individually and jointly on clinical prostate and paraspinal cases. Details of the two cases are reported. Conclusions: In the authors’ computational study they found that both proposed modifications, especially the regularization, yield noticeably improved treatment plans for the same treatment times than what can be obtained using the original VMERGE method. The resulting plans match the quality of 20-beam step-and-shoot IMRT plans with a delivery time of approximately 2 min.« less

  13. TWRS Configuration management program plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vann, J.M.

    The TWRS Configuration Management Program Plan (CMPP) integrates technical and administrative controls to establish and maintain consistency among requirements, product configuration, and product information for TWRS products during all life cycle phases. This CMPP will be used by TWRS management and configuration management personnel to establish and manage the technical and integrated baselines and controls and status changes to those baselines.

  14. The Changing Nature of Technical Assistance.

    ERIC Educational Resources Information Center

    Noggle, Nelson L.

    The changing nature of technical assistance activities and evaluation for compensatory education programs was discussed. The emphasis is on the Education Consolidation and Improvement Act (ECIA) Chapter 1 Technical Assistance Centers (TAC) and their clients. Improvement of school practices demands that the technical assistance process be developed…

  15. Wind Shear radar program future plans

    NASA Technical Reports Server (NTRS)

    Robertson, Roy E.

    1991-01-01

    The status of the Windshear Radar Program at the Collins Air Transport Division of Rockwell International is given in viewgraph form. Topics covered include goals, modifications to the WXR-700 system, flight test plans, technical approaches, design considerations, system considerations, certification, and future plans.

  16. [Plan to improve malaria control towards its elimination in Mesoamerica].

    PubMed

    Rodríguez, Mario Henry; Betanzos-Reyes, Angel Francisco

    2011-01-01

    To develop a plan to strengthen the control of malaria towards its elimination. In 2009, under the coordination of the National Public HealthInstitute ofMexico, atransdisciplinary equipment of technical and operative experts was conformed to carry out a situational analysis of malaria and control programs and for the selection of effective practices of intervention that would be incorporated to the plan, within the framework of an exercise in Theory of Change. Criteria for thestratificationof thelocalities, based ontheirtransmission characteristics were established. The structural and operative limitations of the control programs were identified. A plan of interventions was elaborated to improve the coverage of epidemiological surveillance, anti-malaria interventions and opportune diagnosis and treatment of cases. The plan delineates progressive phases of implementation: reorganization, intensification of interventions and evaluation of elimination feasibility. The adoption of a regional strategic plan will provide guidance and administrative elements to conform a system that coordinates the activities of the national control programs and facilitate the elimination of malaria in the region.

  17. 12 CFR 1805.303 - Technical assistance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... proposes to become a CDFI. Such technical assistance may include training for management and other... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Technical assistance. 1805.303 Section 1805.303... COMMUNITY DEVELOPMENT FINANCIAL INSTITUTIONS PROGRAM Use of Funds/Eligible Activities § 1805.303 Technical...

  18. Trends in liability affecting technical writers

    NASA Technical Reports Server (NTRS)

    Driskill, L. P.

    1981-01-01

    Liability of technical writers for defective products is explored. Documents generated during a product's life cycle (including design memos, design tests, clinical trials, trial use reports, letters, and proposals) become relevant because they are likely to become the only available means of showing that the product was not defectively designed. These documents become the evidence that the product underwent balanced and well considered planning, development, testing, quality control, and field testing. The predicted increased involvement of technical writers in the prevention and defense of product liability claims is cited in view of a greater number of cases turning on "failure to warn".

  19. The Crowded Sea: Incorporating Multiple Marine Activities in Conservation Plans Can Significantly Alter Spatial Priorities

    PubMed Central

    Mazor, Tessa; Possingham, Hugh P.; Edelist, Dori; Brokovich, Eran; Kark, Salit

    2014-01-01

    Successful implementation of marine conservation plans is largely inhibited by inadequate consideration of the broader social and economic context within which conservation operates. Marine waters and their biodiversity are shared by a host of stakeholders, such as commercial fishers, recreational users and offshore developers. Hence, to improve implementation success of conservation plans, we must incorporate other marine activities while explicitly examining trade-offs that may be required. In this study, we test how the inclusion of multiple marine activities can shape conservation plans. We used the entire Mediterranean territorial waters of Israel as a case study to compare four planning scenarios with increasing levels of complexity, where additional zones, threats and activities were added (e.g., commercial fisheries, hydrocarbon exploration interests, aquaculture, and shipping lanes). We applied the marine zoning decision support tool Marxan to each planning scenario and tested a) the ability of each scenario to reach biodiversity targets, b) the change in opportunity cost and c) the alteration of spatial conservation priorities. We found that by including increasing numbers of marine activities and zones in the planning process, greater compromises are required to reach conservation objectives. Complex plans with more activities incurred greater opportunity cost and did not reach biodiversity targets as easily as simplified plans with less marine activities. We discovered that including hydrocarbon data in the planning process significantly alters spatial priorities. For the territorial waters of Israel we found that in order to protect at least 10% of the range of 166 marine biodiversity features there would be a loss of ∼15% of annual commercial fishery revenue and ∼5% of prospective hydrocarbon revenue. This case study follows an illustrated framework for adopting a transparent systematic process to balance biodiversity goals and economic

  20. The technical analysis of the stock exchange and physics: Japanese candlesticks for solar activity

    NASA Astrophysics Data System (ADS)

    Dineva, C.; Atanasov, V.

    2013-09-01

    In this article, we use the Japanese candlesticks, a method popular in the technical analysis of the Stock/Forex markets and apply it to a variable in physics-the solar activity. This method is invented and used exclusively for economic analysis and its application to a physical problem produced unexpected results. We found that the Japanese candlesticks are convenient tool in the analysis of the variables in the physics of the Sun. Based on our observations, we differentiated a new cycle in the solar activity.

  1. Technical Training for Managers.

    ERIC Educational Resources Information Center

    Haverland, Edgar M.

    The question has arisen as to what kind of information a manager without extensive technical training needs to learn to supervise effectively. For example, the Nike Hercules fire control platoon leader, usually an officer in his first active duty assignment, seldom has had extensive technical training. Yet he is responsibile for the…

  2. Mixed-Initiative Constraint-Based Activity Planning for Mars Exploration Rovers

    NASA Technical Reports Server (NTRS)

    Bresina, John; Jonsson, Ari K.; Morris, Paul H.; Rajan, Kanna

    2004-01-01

    In January, 2004, two NASA rovers, named Spirit and Opportunity, successfully landed on Mars, starting an unprecedented exploration of the Martian surface. Power and thermal concerns constrained the duration of this mission, leading to an aggressive plan for commanding both rovers every day. As part of the process for generating these command loads, the MAPGEN tool provides engineers and scientists an intelligent activity planning tool that allows them to more effectively generate complex plans that maximize the science return each day. The key to'the effectiveness of the MAPGEN tool is an underlying artificial intelligence plan and constraint reasoning engine. In this paper we outline the design and functionality of the MAEPGEN tool and focus on some of the key capabilities it offers to the MER mission engineers.

  3. 7 CFR 1468.9 - Conservation farm plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    .... Prior to contract approval, a conservation farm plan must be written and approved. In deciding whether... applicable NRCS field office technical guide or as approved by the State Conservationist. (e) Participants... participant's request, the NRCS may provide technical assistance to a participant. (1) Participants may, at...

  4. 34 CFR 300.702 - Technical assistance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false Technical assistance. 300.702 Section 300.702 Education..., and Use of Funds § 300.702 Technical assistance. (a) In general. The Secretary may reserve not more... to support technical assistance activities authorized under section 616(i) of the Act. (b) Maximum...

  5. Report on active and planned spacecraft and experiments

    NASA Technical Reports Server (NTRS)

    Vette, J. I. (Editor); Vostreys, R. W. (Editor)

    1977-01-01

    Information concerning active and planned spacecraft and experiments is reported. The information includes a wide range of disciplines: astronomy, earth sciences, meteorology, planetary sciences, aeronomy, particles and fields, solar physics, life sciences, and material sciences. These spacecraft projects represent the efforts and funding of individual countries as well as cooperative arrangements among different countries.

  6. Report on active and planned spacecraft and experiments

    NASA Technical Reports Server (NTRS)

    Littlefield, R. G. (Editor)

    1983-01-01

    Information concerning active and planned spacecraft and experiments is included. The information covers a wide range of scientific disciplines: astronomy, earth sciences, meteorology, planetary sciences, aeronomy, particles and fields, solar physics, life sciences, and material sciences. These spacecraft projects represent the efforts and fundng of individual countries as well as cooperative arrangements among different countries.

  7. Louisiana Airport System Plan aviation activity forecasts 1990-2010.

    DOT National Transportation Integrated Search

    1991-07-01

    This report documents the methodology used to develop the aviation activity forecasts prepared as a part of the update to the Louisiana Airport System Plan and provides Louisiana aviation forecasts for the years 1990 to 2010. In general, the forecast...

  8. North Dakota Metropolitan Planning Organization's peer exchange on introducing performance management into the MPO planning process : A TPCB Exchange

    DOT National Transportation Integrated Search

    1997-02-01

    This technical memorandum was developed as part of the study, Systems Planning for Automated Commercial Vehicle Licensing and Permitting Systems. The objective of this study was to define the requirements and develop a plan for a national progr...

  9. Environmental restoration and waste management five year plan, fiscal years 1994--1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    In March 1989, Secretary of Energy James D. Watkins outlined his vision for a changed Department of Energy (DOE) culture. This culture is one of envirorunental responsibility, increased knowledge and involvement in environmental management, a new openness to public input, and overall accountability to the Nation for its actions. Secretary Watkins also requested all the near-term activities necessary to bring DOEactivities into compliance with all applicable environmental requirements to be detailed in one plan. The Five-Year Plan was to be based on a bottom up'' approach to planning by using Activity Data Sheets to collect financial and technical information atmore » the installation level. Over the past three years, the Five-Year Plan has evolved into the primary planning tool for the DOE Environmental Restoration and Waste Management Program, looking beyond the current three-year Federal budget horizon. The FY 1994--1998 Five-Year Plan demonstrates DOE's commitment to a culture based on the principles of openness, responsiveness, and accountability; reports on the progress made in carrying out DOE's environmental mission; identifies what must be accomplished during a five-year planning period; and describes strategies for achieving critical program objectives. This plan represents another step towards the implementation of the culture change Secretary Watkins envisioned. The Five-Year Plan is not exclusively focused on near-term activities. Italso expresses the DOE commitment to a 30-year goal for the cleanup of the 1989 inventory of inactive sites. The FY 1994--1998 Five-Year Plan reiterates the DOE commitment to meeting this and other important environmental goals.« less

  10. 33 CFR 385.30 - Master Implementation Sequencing Plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Incorporating New Information Into the Plan § 385.30 Master Implementation Sequencing Plan. (a) Not later than... projects of the Plan, including pilot projects and operational elements, based on the best scientific, technical, funding, contracting, and other information available. The Corps of Engineers and the South...

  11. Radon control activities for lung cancer prevention in national comprehensive cancer control program plans, 2005-2011.

    PubMed

    Neri, Antonio; Stewart, Sherri L; Angell, William

    2013-08-08

    Radon is the second leading cause of lung cancer among smokers and the leading cause among nonsmokers. The US Environmental Protection Agency recommends that every home be tested for radon. Comprehensive Cancer Control (CCC) programs develop cancer coalitions that coordinate funding and resources to focus on cancer activities that are recorded in cancer plans. Radon tests, remediation, and radon mitigation techniques are relatively inexpensive, but it is unclear whether coalitions recognize radon as an important carcinogen. We reviewed 65 cancer plans created from 2005 through 2011 for the terms "radon," "radiation," or "lung." Plan activities were categorized as radon awareness, home testing, remediation, supporting radon policy activities, or policy evaluation. We also reviewed each CCC program's most recent progress report. Cancer plan content was reviewed to assess alignment with existing radon-specific policies in each state. Twenty-seven of the plans reviewed (42%) had radon-specific terminology. Improving awareness of radon was included in all 27 plans; also included were home testing (n=21), remediation (n=11), support radon policy activities (n=13), and policy evaluation (n=1). Three plans noted current engagement in radon activities. Thirty states had radon-specific laws; most (n=21) were related to radon professional licensure. Eleven states had cancer plan activities that aligned with existing state radon laws. Although several states have radon-specific policies, approximately half of cancer coalitions may not be aware of radon as a public health issue. CCC-developed cancer coalitions and plans should prioritize tobacco control to address lung cancer but should consider addressing radon through partnership with existing radon control programs.

  12. A planning language for activity scheduling

    NASA Technical Reports Server (NTRS)

    Zoch, David R.; Lavallee, David; Weinstein, Stuart; Tong, G. Michael

    1991-01-01

    Mission planning and scheduling of spacecraft operations are becoming more complex at NASA. Described here are a mission planning process; a robust, flexible planning language for spacecraft and payload operations; and a software scheduling system that generates schedules based on planning language inputs. The mission planning process often involves many people and organizations. Consequently, a planning language is needed to facilitate communication, to provide a standard interface, and to represent flexible requirements. The software scheduling system interprets the planning language and uses the resource, time duration, constraint, and alternative plan flexibilities to resolve scheduling conflicts.

  13. Manifestations of metacognitive activity during the collaborative planning of chemistry practical investigations

    NASA Astrophysics Data System (ADS)

    Mathabathe, Kgadi Clarrie; Potgieter, Marietjie

    2017-07-01

    This paper elaborates a process followed to characterise manifestations of cognitive regulation during the collaborative planning of chemistry practical investigations. Metacognitive activity was defined as the demonstration of planning, monitoring, control and evaluation of cognitive activities by students while carrying out the chemistry task. Inherent in collaborative learning is the social aspect of metacognition, which in this study was evidenced in social cognitive regulation (notably of intra- and interpersonal metacognitive regulations) as groups of students went about planning their practical investigations. Discussions of two of the learning groups (n = 4; n = 3) as they planned the extended practical investigation were recorded, transcribed and analysed for indicators of any inherent metacognitive activity. The process of characterising the manifestations of metacognition resulted in the development of a coding system which specifies not only the regulatory strategies at play but the type of regulation (self or other), the area of regulation (cognition, task performance or behaviour) as well as the depth of regulatory contributions (high or low). The fine-grained coding system allowed for a finer theoretical elucidation of the social nature of metacognition. The implications of this study for metacognition and chemistry education research are highlighted.

  14. Ernest Orlando Lawrence Berkeley National Laboratory Institutional Plan FY 2000-2004

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chartock, Mike; Hansen, Todd

    1999-08-01

    The FY 2000-2004 Institutional Plan provides an overview of the Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab, the Laboratory) mission, strategic plan, initiatives, and the resources required to fulfill its role in support of national needs in fundamental science and technology, energy resources, and environmental quality. To advance the Department of Energy's ongoing efforts to define the Integrated Laboratory System, the Berkeley Lab Institutional Plan reflects the strategic elements of our planning efforts. The Institutional Plan is a management report that supports the Department of Energy's mission and programs and is an element of the Department of Energy's strategicmore » management planning activities, developed through an annual planning process. The Plan supports the Government Performance and Results Act of 1993 and complements the performance-based contract between the Department of Energy and the Regents of the University of California. It identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy's program planning initiatives. Preparation of the plan is coordinated by the Office of Planning and Communications from information contributed by Berkeley Lab's scientific and support divisions.« less

  15. Active transportation monitoring plan : initial evaluation of bicycling and walking baseline & planned traffic counts through 2015.

    DOT National Transportation Integrated Search

    2011-09-06

    Active Transportation in the form of bicycle and pedestrian traffic, is monitored for the Austin-Round Rock-San Marcos, TX region by the Capital Area Metropolitan Planning Organization using a variety of methods: automatic, manual and surveyed. This ...

  16. Technical Evaluation Motor No. 10 (TEM-10)

    NASA Technical Reports Server (NTRS)

    1993-01-01

    Technical Evaluation Motor No. 10 (TEM-10) was static fired on 27 Apr. 1993 at the Thiokol Corporation full-scale motor static test bay, T-24. This final test report documents the procedures, performance, and results of the static test firing of TEM-10. All observations, discussions, conclusions, and recommendations contained are final. Included is a presentation and discussion of TEM-10 performance, anomalies, and test results in concurrence with the objectives outlined in CTP-0110, Revision D, Space Shuttle Technical Evaluation Motor No. 10 (TEM-10) Static Fire Test Plan.

  17. Work Planning and Control - Activity-Based Work Authorization

    Science.gov Websites

    Good Activity Description Training & Resources WPC Feedback or Help Request DOE and UC Seals DOE UC Home Training FAQ Contact Home Welcome! The purpose of this site is to keep everyone at LBNL connected in the(Training section). Work Planning and Control (WPC) is a program focused on implementing

  18. Strategic Mobility 21: ICODES Extension Technical Plan

    DTIC Science & Technology

    2006-09-30

    re-planning tasks in a dynamically changing decision- making environment (Figure 2). The internal ontology is divided into logical domains that can...another web browser window opens. This window is divided into two sections. One section displays a graphical representation of the conveyance and its...referenced objects with attributes that can be reasoned about by the TRANSWAY agents. Context is provided by an internal ontology that is divided into

  19. Instructional Television Facilities: A Planning Guide.

    ERIC Educational Resources Information Center

    Witherspoon, John P.; Kessler, William J.

    When planning an instructional television (ITV) system, it is suggested that educational objectives should outweigh technological considerations and that expert advice be secured before the planning process is far advanced. In line with the latter suggestion, the book offers a background of technical knowledge aimed at educational administrators…

  20. 47 CFR 101.1505 - Segmentation plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Segmentation plan. 101.1505 Section 101.1505 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Service and Technical Rules for the 70/80/90 GHz Bands § 101.1505 Segmentation plan. (a) An entity...

  1. Ernest Orlando Lawrence Berkeley National Laboratory institutional plan, FY 1996--2001

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-11-01

    The FY 1996--2001 Institutional Plan provides an overview of the Ernest Orlando Lawrence Berkeley National Laboratory mission, strategic plan, core business areas, critical success factors, and the resource requirements to fulfill its mission in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Laboratory Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Core Business Areas section identifies those initiatives that are potential new research programs representing major long-term opportunities for the Laboratory, and the resources required for their implementation. It alsomore » summarizes current programs and potential changes in research program activity, science and technology partnerships, and university and science education. The Critical Success Factors section reviews human resources; work force diversity; environment, safety, and health programs; management practices; site and facility needs; and communications and trust. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy`s strategic planning activities, developed through an annual planning process. The plan identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy`s program planning initiatives. Preparation of the plan is coordinated by the Office of Planning and Communications from information contributed by the Laboratory`s scientific and support divisions.« less

  2. 34 CFR 380.6 - What activities may the Secretary fund under technical assistance supported employment projects?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION SPECIAL PROJECTS AND DEMONSTRATIONS FOR PROVIDING SUPPORTED EMPLOYMENT SERVICES TO INDIVIDUALS... 34 Education 2 2010-07-01 2010-07-01 false What activities may the Secretary fund under technical...

  3. RADON REDUCTION TECHNIQUES FOR EXISTING DETACHED HOUSES - TECHNICAL GUIDANCE (THIRD EDITION) FOR ACTIVE SOIL DEPRESSURIZATION SYSTEMS

    EPA Science Inventory

    This technical guidance document is designed to aid in the selection, design, installation and operation of indoor radon reduction techniques using soil depressurization in existing houses. Its emphasis is on active soil depressurization; i.e., on systems that use a fan to depre...

  4. 76 FR 20364 - Notice of Proposed Information Collection: Comment Request; Technical Assistance for Community...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-12

    ... Information Collection: Comment Request; Technical Assistance for Community Planning and Development Programs AGENCY: Office of the Assistant Secretary for Community Planning And Development, HUD. ACTION: Notice... Community Planning and Development, Department of Housing Urban and Development, 451 7th Street, SW., Room...

  5. NASA Technical Standards Program and Implications for Lessons Learned and Technical Standard Integration

    NASA Technical Reports Server (NTRS)

    Gill, Paul S.; Garcia, Danny; Vaughan, William W.; Parker, Nelson C. (Technical Monitor)

    2002-01-01

    The National Aeronautics and Space Agency consists of fourteen Facilities throughout the United States. They are organized to support the Agency's principal Enterprises: (1) Space Science, (2) Earth Science, (3) Aerospace Technology, (4) Human Exploration and Development of Space, and (5) Biological and Physical Research. Technical Standards are important to the activities of each Enterprise and have been an integral part in the development and operation of NASA Programs and Projects since the Agency was established in 1959. However, for years each Center was responsible for its own standards development and selection of non-NASA technical standards that met the needs of Programs and Projects for which they were responsible. There were few Agencywide applicable Technical Standards, mainly those in area of safety. Department of Defense Standards and Specifications were the foundation and main source for Technical Standards used by the Agency. This process existed until about 1997 when NASA embarked on a Program to convert NASA's Center-developed Technical Standards into Agencywide endorsed NASA Preferred Technical Standards. In addition, action was taken regarding the formal adoption of non-NASA Technical Standards (DOD, SAE, ASTM, ASME, IEEE, etc.) as NASA Preferred Technical Standards.

  6. 40 CFR 52.1119 - Identification of plan-conditional approval.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Implementation Plan Revision for a Small Business Technical and Environmental Compliance Assistance Program dated... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Identification of plan-conditional... PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Massachusetts § 52.1119...

  7. 75 FR 30387 - Improving Market and Planning Efficiency Through Improved Software; Notice of Agenda and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-01

    ... Market and Planning Efficiency Through Improved Software; Notice of Agenda and Procedures for Staff... planning models and software. The technical conference will be held from 8 a.m. to 5:30 p.m. (EDT) on June.... Agenda for AD10-12 Staff Technical Conference on Planning Models and Software Federal Energy Regulatory...

  8. Groundwater Protection Program Management Plan For The U.S. Department Of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Elvado Environmental, LLC

    2009-09-01

    This document presents the Groundwater Protection Program (GWPP) management plan for the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12). The Y-12 GWPP functions as the primary point-of-contact for groundwater-related issues at Y-12, provides stewardship of the extensive network of groundwater monitoring wells at Y-12, and serves as a resource for technical expertise, support, and historical data for groundwater-related activities at Y-12. These organizational functions each serve the primary programmatic purpose of the GWPP, which is to ensure that groundwater monitoring activities within areas under Y-12 administrative control provide representative data in compliance with themore » multiple purposes of applicable state and federal regulations, DOE orders, and the corporate policies of Babcock & Wilcox Technical Services Y-12 LLC (hereafter referenced as B&W Y-12), the Y-12 management and operations (M&O) contractor for DOE. B&W Y-12 is a new corporate name, assumed in January 2007, for the company formerly known as BWXT Y-12, L.L.C., hereafter referenced as BWXT. This GWPP management plan addresses the requirements of DOE Order 450.1A Environmental Protection Program (hereafter referenced as DOE O 450.1A), which emphasize a site-wide approach for groundwater protection at each DOE facility through implementation of groundwater surveillance monitoring. Additionally, this plan addresses the relevant and applicable GWPP elements and goals described in the DOE O 450.1A technical guidance documents issued in June 2004 (DOE 2004) and May 2005 (DOE 2005). This GWPP management plan is a 'living' document that is reviewed annually, revised and reissued every three years, and is formatted to provide for updating individual sections independent of the rest of the document. Section 2 includes a short description of the groundwater system at Y-12, the history of groundwater monitoring at Y-12 and the corresponding evolution of

  9. [Evaluation of the lifestyle of students of physiotherapy and technical & computer science basing on their diet and physical activity].

    PubMed

    Medrela-Kuder, Ewa

    2011-01-01

    The aim of the study was the evaluation of a dietary habits profile and physical activity of Physiotherapy and Technical & Computer Science students. The research involved a group of 174 non-full-time students of higher education institutions in Krakow aged between 22 and 27. 81 students of the surveyed studied Physiotherapy at the University of Physical Education, whereas 93 followed a course in Technical & Computer Science at the Pedagogical University. In this project a diagnostic survey method was used. The study revealed that the lifestyle of university youth left much to be desired. Dietary errors were exemplified by irregular meals intake, low consumption of fish, milk and dairy, snacking between meals on high calorie products with a poor nutrient content. With regard to physical activity, Physiotherapy students were characterised by more positive attitudes than those from Technical & Computer Science. Such physical activity forms as swimming, team sports, cycling and strolling were declared by the surveyed the most frequently. Health-oriented education should be introduced in such a way as to improve the knowledge pertaining to a health-promoting lifestyle as a means of prevention of numerous diseases.

  10. Report on active and planned spacecraft and experiments

    NASA Technical Reports Server (NTRS)

    Vette, J. I. (Editor); Vostreys, R. W. (Editor); Horowitz, R. (Editor)

    1978-01-01

    Information is presented, concerning active and planned spacecraft and experiments known to the National Space Science Data Center. The information included a wide range of disciplines: astronomy, earth sciences, meteorology, planetary sciences, aeronomy, particles and fields, solar physics, life sciences, and material sciences. These spacecraft projects represented the efforts and funding of individual countries as well as cooperative arrangements among different countries.

  11. Report on active and planned spacecraft and experiments

    NASA Technical Reports Server (NTRS)

    Horowitz, R. (Editor); Nostreys, R. W. (Editor)

    1980-01-01

    Information on current and planned spacecraft activity for a broad range of scientific disciplines is presented. The information covers a wide range of disciplines: astronomy, Earth sciences, meteorology, planetary sciences, aeronomy, particles and fields, solar physics, life sciences, and material sciences. These spacecraft projects represent the efforts and funding of individual countries as well as cooperative arrangements among different countries.

  12. Technical Assistance Program: Off to a Running Start (Newsletter)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This newsletter describes key activities of the DOE Office of Indian Energy Policy and Programs for Winter 2012. Between December 2, 2011, and January 15, 2012, 46 American Indian and Alaska Native Tribes submitted applications to receive technical assistance through the program, which provides Tribes with on-the-ground technical support from DOE and National Renewable Energy Laboratory (NREL) staff to help move tribal energy efficiency and renewable energy projects forward. The applications are being considered through the Strategic Technical Assistance Response Team (START) selection process, which incorporates expert reviews and outreach to Tribes who present a need for assistance with theirmore » community-based energy efficiency and renewable energy projects. The final successful applicants will be selected based on the clarity of their requests for technical assistance and the ability of START to successfully work with each unique project or community. At least three selected Tribes in Alaska will receive technical assistance between March and May 2012, and up to five selected Tribes in the contiguous United States will receive technical assistance between March and August 2012. During the months of START Program activity, DOE and NREL experts will work in the two locations. In Alaska, START experts will work directly with community-based project teams to analyze local energy issues and provide assistance with energy projects and cost savings initiatives. This effort will be bolstered by DOE-IE's partnership with the Denali Commission, which will provide further assistance and expertise. In the lower 48 states, NREL experts will work with the selected renewable energy START projects to evaluate financial and technical feasibility and provide early development technical assistance to better position the projects for financing and construction. This on-the-ground technical assistance is part of a broader DOE-IE effort to make reliable, accurate technical

  13. School travel planning: mobilizing school and community resources to encourage active school transportation.

    PubMed

    Buliung, Ron; Faulkner, Guy; Beesley, Theresa; Kennedy, Jacky

    2011-11-01

    Active school transport (AST), school travel using an active mode like walking, may be important to children's overall physical activity. A "school travel plan" (STP) documents a school's transport characteristics and provides an action plan to address school and neighborhood barriers to AST. We conducted a pilot STP intervention at 12 schools in 4 Canadian provinces. Facilitators and school personnel created and implemented AST action plans. Parent's self-reports (N = 1489) were the basis for evaluating the intervention. A content analysis identified type, frequency, and perceived success of initiatives. School travel plans emphasized education and promotion, and AST activities and events. Capital improvement projects were more common at schools in older suburban neighborhoods, whereas enforcement was more common at schools in newer suburban neighborhoods. Rates of active transportation increased from 43.8% to 45.9%. At follow-up, 13.3% of households reported less driving. Parents/caregivers cited weather, convenience, and trip chaining as primary reasons for continued driving. The STP process may facilitate changes to patterns of school travel. An STP can expand a school's capacity to address transportation issues through mobilization of diverse community resources. Future STP initiatives may benefit from addressing convenience, safety through enforcement, and by examining how schools can be supported in implementing infrastructure improvements. © 2011, American School Health Association.

  14. Building capacity in local government for integrated planning to increase physical activity: evaluation of the VicHealth MetroACTIVE program.

    PubMed

    Thomas, M M; Hodge, W; Smith, B J

    2009-12-01

    Integrated planning is a holistic approach to addressing the needs of local communities built on partnerships between those responsible for development, environmental quality and service provision. This study investigated the extent and key influences on the use of integrated planning to promote physical activity among six metropolitan councils in Melbourne Australia, which took part in the MetroACTIVE Project funded by the Victorian Health Promotion Foundation from 2005 to 2007. The evaluation entailed interviews conducted at the mid-term (N = 67) and completion (N = 50) of the project, and the review of relevant documents. Respondents included elected councillors, chief executive officers, officers from different council divisions and the project staff employed in each council. Three councils showed evidence of integrated planning for physical activity, whereas the remainder focused on the delivery of community participation programs. Leadership from senior management and an organizational culture that supported collaboration across council departments were prerequisites for integrated planning. Employment of a dedicated project officer with skills for engaging management and building partnerships within the organization was important. Barriers to integrated planning were a complex organization structure, high demands on the council due to a growing residential population and a poor climate among staff. Overall, integrated planning was found to be a viable approach for developing a coordinated approach to this issue involving the range of council services and functions. Ongoing strategies are needed to facilitate senior management commitment and organizational capacity for integrated planning, with leadership provided by departments responsible for infrastructure or corporate planning.

  15. 40 CFR 52.1519 - Identification of plan-conditional approval.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Implementation Plan Revision for a Small Business Technical and Environmental compliance Assistance Program dated... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Identification of plan-conditional... PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) New Hampshire § 52.1519...

  16. Telecommunications Network Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1989-05-01

    The Office of Civilian Radioactive Waste Management (OCRWM) must, among other things, be equipped to readily produce, file, store, access, retrieve, and transfer a wide variety of technical and institutional data and information. The data and information regularly produced by members of the OCRWM Program supports, and will continue to support, a wide range of program activities. Some of the more important of these information communication-related activities include: supporting the preparation, submittal, and review of a license application to the Nuclear Regulatory Commission (NRC) to authorize the construction of a geologic repository; responding to requests for information from parties affectedmore » by and/or interested in the program; and providing evidence of compliance with all relevant Federal, State, local, and Indian Tribe regulations, statutes, and/or treaties. The OCRWM Telecommunications Network Plan (TNP) is intended to identify, as well as to present the current strategy for satisfying, the telecommunications requirements of the civilian radioactive waste management program. The TNP will set forth the plan for integrating OCRWM`s information resources among major program sites. Specifically, this plan will introduce a telecommunications network designed to establish communication linkages across the program`s Washington, DC; Chicago, Illinois; and Las Vegas, Nevada, sites. The linkages across these and associated sites will comprise Phase I of the proposed OCRWM telecommunications network. The second phase will focus on the modification and expansion of the Phase I network to fully accommodate access to the OCRWM Licensing Support System (LSS). The primary components of the proposed OCRWM telecommunications network include local area networks; extended local area networks; and remote extended (wide) area networks. 10 refs., 6 figs.« less

  17. Technical Guidance for Hazardous Analysis, Emergency Planning for Extremely Hazardous Substances

    EPA Pesticide Factsheets

    This current guide supplements NRT-1 by providing technical assistance to LEPCs to assess the lethal hazards related to potential airborne releases of extremely hazardous substances (EHSs) as designated under Section 302 of Title Ill of SARA.

  18. Technical writing versus technical writing

    NASA Technical Reports Server (NTRS)

    Dillingham, J. W.

    1981-01-01

    Two terms, two job categories, 'technical writer' and 'technical author' are discussed in terms of industrial and business requirements and standards. A distinction between 'technical writing' and technical 'writing' is made. The term 'technical editor' is also considered. Problems inherent in the design of programs to prepare and train students for these jobs are discussed. A closer alliance between industry and academia is suggested as a means of preparing students with competent technical communication skills (especially writing and editing skills) and good technical skills.

  19. Quality-assurance plan for water-quality activities in the U.S. Geological Survey Washington Water Science Center

    USGS Publications Warehouse

    Conn, Kathleen E.; Huffman, Raegan L.; Barton, Cynthia

    2017-05-08

    In accordance with guidelines set forth by the Office of Water Quality in the Water Mission Area of the U.S. Geological Survey, a quality-assurance plan has been created for use by the Washington Water Science Center (WAWSC) in conducting water-quality activities. This qualityassurance plan documents the standards, policies, and procedures used by the WAWSC for activities related to the collection, processing, storage, analysis, and publication of water-quality data. The policies and procedures documented in this quality-assurance plan for water-quality activities complement the quality-assurance plans for surface-water and groundwater activities at the WAWSC.

  20. 7 CFR 653.3 - Adaptation of technical standards.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 6 2012-01-01 2012-01-01 false Adaptation of technical standards. 653.3 Section 653.3..., DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES TECHNICAL STANDARDS § 653.3 Adaptation of technical standards. Technical standards and criteria developed on a national basis may require special adaptation to meet local...

  1. 7 CFR 653.3 - Adaptation of technical standards.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 6 2014-01-01 2014-01-01 false Adaptation of technical standards. 653.3 Section 653.3..., DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES TECHNICAL STANDARDS § 653.3 Adaptation of technical standards. Technical standards and criteria developed on a national basis may require special adaptation to meet local...

  2. 7 CFR 653.3 - Adaptation of technical standards.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 6 2011-01-01 2011-01-01 false Adaptation of technical standards. 653.3 Section 653.3..., DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES TECHNICAL STANDARDS § 653.3 Adaptation of technical standards. Technical standards and criteria developed on a national basis may require special adaptation to meet local...

  3. 7 CFR 653.3 - Adaptation of technical standards.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 6 2013-01-01 2013-01-01 false Adaptation of technical standards. 653.3 Section 653.3..., DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES TECHNICAL STANDARDS § 653.3 Adaptation of technical standards. Technical standards and criteria developed on a national basis may require special adaptation to meet local...

  4. Changes in DSTO Support to Projects Arising From the 6th July 2006 DCIC Decision: Updated Guidance for Project S&T Plans

    DTIC Science & Technology

    2007-02-01

    responsible to the Government for certifying these technical risks [4] and [5] The current funding model for Project S&T Plans is: • Pre-First...the new costing spreadsheets at Annexes C-E. 3.1 A complete set of S&T Activities The 6th July 2006 DCIC decisions to change the funding model increase...changes to the funding model mean that the set of S&T Activities in the Project S&T Plans will need to be categorised in new ways to fit in with the

  5. 7 CFR 652.4 - Technical service standards.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... technologies and practices. (c) A technical service provider must assume responsibility in writing for the... 7 Agriculture 6 2010-01-01 2010-01-01 false Technical service standards. 652.4 Section 652.4..., DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES TECHNICAL SERVICE PROVIDER ASSISTANCE General Provisions § 652.4...

  6. 40 CFR 52.1110 - Small business stationary source technical and environmental compliance assistance program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... technical and environmental compliance assistance program. 52.1110 Section 52.1110 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Maryland § 52.1110 Small business stationary source technical and environmental...

  7. SEDAC information gateway plan V(1)

    NASA Technical Reports Server (NTRS)

    Chen, Robert S. (Compiler)

    1995-01-01

    This annual update of the Information Gateway Plan incorporates changes recommended by the Socioeconomic Data and Applications Center (SEDAC) User Working Group (UWG) and reflects comments and suggestions from users, collaborators, and the Contracting Officer Technical Representative (COTR). The Information Gateway Plan is a concise and specific plan that outlines SEDAC activities and services in support of the earth and social sciences and other user communities. The SEDAC Information Gateway effort is a primary means by which the Earth Observing System Data and Information System (EOSDIS) can link meaningfully with a broad range of social science data sources and users in ways that lead to tangible benefits to the American people. The SEDAC Information Gateway provides interdisciplinary access to socioeconomic and physical science data and information resources held by SEDAC and numerous other institutions and networks around the world. The Plan describes the areas of research of earth scientists and socioeconomic scientists where interchange of data and information is most needed. It sets guidelines for the continued development of SEDAC's directory of social science datasets and establishes priorities for efforts to make data held by SEDAC or accessible through SEDAC available to the user community. The Plan also describes the means by which the SEDAC user community can access information products specified by the SEDAC Data and Applications Development Plan (DADP). Among other major activities, SEDAC will continue to enhance and operate a directory capability, interoperable with the Global Change Master Directory, that provides the socioeconomic community with information about earth science products and the earth science research community with information about socioeconomic data. The Information Gateway also serves as a unique and powerful access pathway for a wide range of users and potential users of socioeconomic and earth science data, including

  8. 77 FR 58858 - Agency Information Collection Activity: Subpart B, Plans and Information; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-24

    ... recipient above and beyond those which accrue to the public at large. Deepwater Operations Plans are subject... to make an informed decision on whether to approve the proposed deepwater operations plans, or...-2012-0014; OMB Control Number 1014-NEW] Agency Information Collection Activity: Subpart B, Plans and...

  9. Office of River Protection Advanced Low-Activity Waste Glass Research and Development Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peeler, David K.; Kim, Dong-Sang; Vienna, John D.

    2015-11-01

    The U.S. Department of Energy Office of River Protection (ORP) has initiated and leads an integrated Advanced Waste Glass (AWG) program to increase the loading of Hanford tank wastes in glass while meeting melter lifetime expectancies and process, regulatory, and product performance requirements. The integrated ORP program is focused on providing a technical, science-based foundation for making key decisions regarding the successful operation of the Hanford Tank Waste Treatment and Immobilization Plant (WTP) facilities in the context of an optimized River Protection Project (RPP) flowsheet. The fundamental data stemming from this program will support development of advanced glass formulations, keymore » product performance and process control models, and tactical processing strategies to ensure safe and successful operations for both the low-activity waste (LAW) and high-level waste vitrification facilities. These activities will be conducted with the objective of improving the overall RPP mission by enhancing flexibility and reducing cost and schedule. The purpose of this advanced LAW glass research and development plan is to identify the near-term, mid-term, and longer-term research and development activities required to develop and validate advanced LAW glasses, property-composition models and their uncertainties, and an advanced glass algorithm to support WTP facility operations, including both Direct Feed LAW and full pretreatment flowsheets. Data are needed to develop, validate, and implement 1) new glass property-composition models and 2) a new glass formulation algorithm. Hence, this plan integrates specific studies associated with increasing the Na2O and SO3/halide concentrations in glass, because these components will ultimately dictate waste loadings for LAW vitrification. Of equal importance is the development of an efficient and economic strategy for 99Tc management. Specific and detailed studies are being implemented to understand the fate of Tc

  10. The multidisciplinary treatment plan: a format for enhancing activity therapy department involvement.

    PubMed

    Lang, E; Mattson, M

    1985-01-01

    A structured, goal-oriented format for enhancing the involvement of activity therapy disciplines in the multidisciplinary treatment planning process has been developed in a large private psychiatric teaching hospital. The format, an adaptation of the problem-oriented record, encompasses formal procedures for identifying and recording relevant problems, goals, methods, and objectives for activity therapy treatment. The benefits of this approach include the development of specific, measurable, attainable functional goals; increased accountability in treatment planning and delivery; less time spent in documentation; and education of other staff about the role and function of activities therapy. Patients have a better understanding of their goals and the steps needed to achieve them and show increased participation in the therapy process.

  11. Word Processing for Technical Writers and Teachers.

    ERIC Educational Resources Information Center

    Mullins, Carolyn J.; West, Thomas W.

    This discussion of the computing network and word processing facilities available to professionals on the Indiana University campuses identifies the word and text processing needs of technical writers and faculty, describes the current computing network, and outlines both long- and short-range objectives, policies, and plans for meeting these…

  12. 38 CFR 61.55 - Technical assistance reports.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) VA HOMELESS PROVIDERS GRANT AND PER DIEM PROGRAM § 61.55 Technical assistance reports. Each recipient of a technical assistance grant must submit to VA, quarterly, a report describing the activities... 38 Pensions, Bonuses, and Veterans' Relief 2 2011-07-01 2011-07-01 false Technical assistance...

  13. 38 CFR 61.55 - Technical assistance reports.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) VA HOMELESS PROVIDERS GRANT AND PER DIEM PROGRAM § 61.55 Technical assistance reports. Each recipient of a technical assistance grant must submit to VA, quarterly, a report describing the activities... 38 Pensions, Bonuses, and Veterans' Relief 2 2012-07-01 2012-07-01 false Technical assistance...

  14. 38 CFR 61.55 - Technical assistance reports.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) VA HOMELESS PROVIDERS GRANT AND PER DIEM PROGRAM § 61.55 Technical assistance reports. Each recipient of a technical assistance grant must submit to VA, quarterly, a report describing the activities... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Technical assistance...

  15. Report on active and planned spacecraft and experiments

    NASA Technical Reports Server (NTRS)

    Brecht, J. J. (Editor)

    1974-01-01

    Information dealing with active and planned spacecraft and experiments known to the National Space Science Data Center (NSSDC) is presented. Included is information concerning a wide range of disciplines: astronomy, earth sciences, meteorology, planetary sciences, aeronomy, particles and fields, solar physics, life sciences, and material sciences. These spacecraft represent the efforts and funding of individual countries, as well as cooperative arrangements among different countries.

  16. NEP systems engineering efforts in FY-92: Plans and status

    NASA Technical Reports Server (NTRS)

    Doherty, Michael P.; Gilland, James H.

    1992-01-01

    A system engineering effort has been initiated by NASA in FY-92 to define, address, and resolve issues associated with the use of Nuclear Electric Propulsion (NEP) for megawatt (MW) space propulsion applications associated with the Space Exploration Initiative (SEI). It is intended that key technical issues will be addressed by activities conducted in the early years of a project in NEP, with the objective of resolving such issues. Also, in response to more recent programmatic direction, a concept definition activity for 100 kilowatt NEP is being initiated. This paper will present key issues associated with megawatt NEP, and the plans and status for their resolution, and present the scope and rationale for the 100 kilowatt concept definition activity.

  17. Interactions between Patients, Providers, and Health Systems and Technical Quality of Care

    PubMed Central

    Yelin, Edward; Yazdany, Jinoos; Tonner, Chris; Trupin, Laura; Criswell, Lindsey A.; Katz, Patricia; Schmajuk, Gabriela

    2014-01-01

    Objectives Prior studies have established disparities by race/ethnicity and socioeconomic status (SES) in the kind, quantity, and technical quality of SLE care and outcomes. In this study we evaluate whether disparities exist in assessments of interactions with health care providers and health plans and whether such interactions affect the technical quality of SLE care. Methods Data derive from the Lupus Outcomes Study (LOS). Principal data collection is an annual structured phone interview including items from the Consumer Assessment of Health Plans and Interpersonal Processes of Care Scale measuring dimensions of health care interactions. We use general estimating equations to assess whether disparities exist by race/ethnicity and SES in being in the lowest quartile of ratings of such interactions and whether ratings in the lowest quartile of interactions are associated with technical quality of care after adjustment for sociodemographic and disease characteristics. Results In the 2012 LOS interview, there were 793 respondents, of whom 640 had ≥1 visits to their principal SLE provider. Non-white race/ethnicity and education were not associated with low ratings on any dimension of provider or system interaction; poverty was associated only with low ratings of health plan interactions. After adjustment for demographics, SLE status, and health care variables, ratings in the lowest quartile on all dimensions were associated with significantly lower technical quality of care. Conclusions Ratings in the lowest quartile on all dimensions of interactions with providers and the health care system were associated with lower technical quality of care, potentially resulting in poorer SLE outcomes. PMID:25132660

  18. Interactions between patients, providers, and health systems and technical quality of care.

    PubMed

    Yelin, Edward; Yazdany, Jinoos; Tonner, Chris; Trupin, Laura; Criswell, Lindsey A; Katz, Patricia; Schmajuk, Gabriela

    2015-03-01

    Prior studies have established disparities by race/ethnicity and socioeconomic status (SES) in the kind, quantity, and technical quality of systemic lupus erythematosus (SLE) care and outcomes. In this study we evaluate whether disparities exist in assessments of interactions with health care providers and health plans and whether such interactions affect the technical quality of SLE care. Data derive from the Lupus Outcomes Study (LOS). Principal data collection is an annual structured phone interview including items from the Consumer Assessment of Health Plans and Interpersonal Processes of Care Scale measuring dimensions of health care interactions. We use general estimating equations to assess whether disparities exist by race/ethnicity and SES in being in the lowest quartile of ratings of such interactions and whether ratings in the lowest quartile of interactions are associated with technical quality of care after adjustment for sociodemographic and disease characteristics. In the 2012 LOS interview, there were 793 respondents, of whom 640 had ≥1 visit to their principal SLE provider. Nonwhite race/ethnicity and education were not associated with low ratings on any dimension of provider or system interaction; poverty was associated only with low ratings of health plan interactions. After adjustment for demographics, SLE status, and health care variables, ratings in the lowest quartile on all dimensions were associated with significantly lower technical quality of care. Ratings in the lowest quartile on all dimensions of interactions with providers and the health care system were associated with lower technical quality of care, potentially resulting in poorer SLE outcomes. Copyright © 2015 by the American College of Rheumatology.

  19. PUREX/UO{sub 3} deactivation project management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Washenfelder, D.J.

    1993-12-01

    From 1955 through 1990, the Plutonium-Uranium Extraction Plant (PUREX) provided the United States Department of Energy Hanford Site with nuclear fuel reprocessing capability. It operated in sequence with the Uranium Trioxide (UO{sub 3}) Plant, which converted the PUREX liquid uranium nitrate product to solid UO{sub 3} powder. Final UO{sub 3} Plant operation ended in 1993. In December 1992, planning was initiated for the deactivation of PUREX and UO{sub 3} Plant. The objective of deactivation planning was to identify the activities needed to establish a passively safe, environmentally secure configuration at both plants, and ensure that the configuration could be retainedmore » during the post-deactivation period. The PUREX/UO{sub 3} Deactivation Project management plan represents completion of the planning efforts. It presents the deactivation approach to be used for the two plants, and the supporting technical, cost, and schedule baselines. Deactivation activities concentrate on removal, reduction, and stabilization of the radioactive and chemical materials remaining at the plants, and the shutdown of the utilities and effluents. When deactivation is completed, the two plants will be left unoccupied and locked, pending eventual decontamination and decommissioning. Deactivation is expected to cost $233.8 million, require 5 years to complete, and yield $36 million in annual surveillance and maintenance cost savings.« less

  20. Goal Reconstruction: How Teton Blends Situated Action and Planned Action

    DTIC Science & Technology

    1989-11-03

    DTIC FILE COPy 00 P 1n GOAL RECONSTRUCTION: HOW TETON BLENDS N SITUATED ACTION AND PLANNED ACTION Technical Report AIP 125 Kurt VanLehn William Ball...distribiikn unlimited. so 08 21 2 GOAL RECONSTRUCTION: HOW TETON BLENDS SITUATED ACTION AND PLANNED ACTION Technical Report AlP 125 Kurt VanLehn William Ball...Architectures for Intelligence. This is the final report on the research supported by the Computer Science Division, Office of Naval Research, under

  1. Cerulean Warbler Technical Group: Coordinating international research and conservation

    USGS Publications Warehouse

    Dawson, D.K.; Wigley, T.B.; Keyser, P.D.

    2012-01-01

    Effective conservation for species of concern requires interchange and collaboration among conservationists and stakeholders. The Cerulean Warbler Technical Group (CWTG) is a consortium of biologists and managers from government agencies, non-governmental organizations, academia, and industry, who are dedicated to finding pro-active, science-based solutions for conservation of the Cerulean Warbler (Setophaga cerulea). Formed in the United States in 2001, CWTG’s scope soon broadened to address the species’ ecology and conservation on both the breeding and non-breeding ranges, in partnership with biologists from South and Central America. In 2004, CWTG launched the Cerulean Warbler Conservation Initiative, a set of activities aimed at addressing information and conservation needs for the species. These include (1) studies in the core breeding range to assess Cerulean Warbler response to forest management practices and to identify mined lands that could be reforested to benefit the species, (2) ecological and demographic studies on the winter range, and (3) surveys of Cerulean Warbler distribution on the breeding and winter ranges and during migration. A rangewide conservation action plan has been completed, along with a more detailed conservation plan for the non-breeding range. CWTG and partners now move forward with on-the-ground conservation, while still addressing unmet information needs.

  2. Quality-Assurance Plan for Water-Quality Activities of the U.S. Geological Survey Montana Water Science Center

    USGS Publications Warehouse

    Lambing, John H.

    2006-01-01

    In accordance with guidelines set forth by the Office of Water Quality in the Water Resources Discipline of the U.S. Geological Survey (USGS), a quality-assurance plan has been created for use by the USGS Montana Water Science Center in conducting water-quality activities. This quality-assurance plan documents the standards, policies, and procedures used by the USGS Montana Water Science Center for activities related to the collection, processing, storage, analysis, and publication of water-quality data. The policies and procedures presented in this quality-assurance plan for water-quality activities complement the quality-assurance plans for surface-water and ground-water activities and suspended-sediment analysis.

  3. 10 CFR 603.885 - Updated program plans and budgets.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... program plans and budgets. In addition to reports on progress to date, a TIA may include a provision requiring the recipient to annually prepare an updated technical plan for future conduct of the research...

  4. Strategic Mobility 21 Project Management Plan

    DTIC Science & Technology

    2006-09-29

    California Association of Governments (SCAG), and other stakeholders to transform the former military installation into a modern in-land distribution node... governments , including adversary governments , and may be exported. c. This statement may not be used on technical documents that formerly were...required updates of both the ICD and the Technical Plan. SM21 has established a consortium of public and private, governmental and non

  5. A Technical Evaluation of the First Stage of the Mediterranean Regional Project.

    ERIC Educational Resources Information Center

    Hollister, Robinson

    Objectives of this technical evaluation concerning the transfer of experience in the development of human resources were to develop educational plans based upon comprehensive estimates of manpower requirements and to evaluate the methods used in estimating manpower requirements for educational planning. The methodology involved estimates of the…

  6. 40 CFR 52.744 - Small business stationary source technical and environmental compliance assistance program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Small business stationary source technical and environmental compliance assistance program. 52.744 Section 52.744 Protection of Environment... PLANS Illinois> § 52.744 Small business stationary source technical and environmental compliance...

  7. 40 CFR 52.798 - Small business stationary source technical and environmental compliance assistance program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Small business stationary source technical and environmental compliance assistance program. 52.798 Section 52.798 Protection of Environment... PLANS Indiana § 52.798 Small business stationary source technical and environmental compliance...

  8. Curriculum Development System for Navy Technical Training.

    ERIC Educational Resources Information Center

    Butler, Lucius

    Documentation for the U.S. Navy's curriculum development system is brought together in this paper, beginning with a description of the Naval Technical Training System. This description includes the Navy Training Plan (NTP) process, which is the current mechanism for introducing new courses; the organization and administration of the system; the…

  9. Postsecondary Technical Education and the Energy Crisis.

    ERIC Educational Resources Information Center

    Riendeau, Albert J.

    The energy problem affects virtually every wage earner in America and cries out for increased involvement by vocational and technical educators. A recent study by the National Planning Association points up the need to project future manpower demands in energy and energy-related industries so that the country's educational and training…

  10. Connected vehicle impacts on transportation planning : technical memorandum #5 : case studies.

    DOT National Transportation Integrated Search

    2015-12-01

    The principal objective of this project, Connected Vehicle Impacts on Transportation Planning, is to comprehensively assess how connected vehicles should be considered across the range of transportation planning processes and products developed...

  11. NASA STI Program Coordinating Council Eleventh Meeting: NASA STI Modernization Plan

    NASA Technical Reports Server (NTRS)

    1993-01-01

    The theme of this NASA Scientific and Technical Information Program Coordinating Council Meeting was the modernization of the STI Program. Topics covered included the activities of the Engineering Review Board in the creation of the Infrastructure Upgrade Plan, the progress of the RECON Replacement Project, the use and status of Electronic SCAN (Selected Current Aerospace Notices), the Machine Translation Project, multimedia, electronic document interchange, the NASA Access Mechanism, computer network upgrades, and standards in the architectural effort.

  12. Differentiated Instruction for K-8 Math and Science: Activities and Lesson Plans

    ERIC Educational Resources Information Center

    Hamm, Mary; Adams, Dennis

    2008-01-01

    This book offers practical recommendations to reach every student in a K-8 classroom. Research-based and written in a teacher-friendly style, it will help teachers with classroom organization and lesson planning in math and science. Included are math and science games, activities, ideas, and lesson plans based on the math and science standards.…

  13. Sources of population and family planning assistance.

    PubMed

    1983-01-01

    This document assesses the current status of population and family planning assistance throughout the world and provides brief sketches of the available sources including national governments, intergovernmental agencies such as the UNFPA and other UN entities, and nongovernmental funding, technical assistance, or funding and technical assistance organizations. The descriptions of aid-granting organizations describe their purposes, sources of funding, and activities, and give addresses where further information may be sought. At present about $100 million of the US $1 billion spent for family planning in developing countries each year comes from individuals paying for their own supplies and services, over $400 million is spent by national governments on their own programs, and about $450 million comes from developed country governments and private agencies. Over half of external assistance appears to be channeled through international agencies, and only a few countries provide a substantial proportion of aid bilaterally. In the past decade several governments, particularly in Asia, significantly increased the share of program costs they assumed themselves, and the most populous developing countries, China, India, and Indonesia, now contribute most of the funding for their own programs. Although at least 130 countries have provided population aid at some time, most is given by 12 industrialized countries. The US Agency for International Development (USAID) is the largest single donor, but the US share of population assistance has declined to 50% of all assistance in 1981 from 60% in the early 1970s. Governments of Communist bloc countries have made only small contributions to international population assistance. Most governmental asistance is in cash grant form, but loans, grants in kind, and technical assistance are also provided. Private organizations give assistance primarily to other private organizations in developing countries, and have been major innovators in

  14. Minnesota Deaf-Blind Technical Assistance Project. Final Report.

    ERIC Educational Resources Information Center

    Kloos, Eric

    This final report describes activities and accomplishments of the 3-year federally supported Minnesota Deaf-Blind Technical Assistance Project. The project provided training and technical assistance, information sharing, and support services to families of children with deaf-blindness. Activities and accomplishments included: collaboration with…

  15. Brownfields Green Avenue Sites: Technical Memorandum - Conceptual Design for Sustainable Redevelopment

    EPA Pesticide Factsheets

    This technical memorandum briefly describes the site and proposed conceptual site plan, indicates conceptual design considerations, specifies recommended green and sustainable features, and offers other recommendations

  16. Radon Control Activities for Lung Cancer Prevention in National Comprehensive Cancer Control Program Plans, 2005–2011

    PubMed Central

    Stewart, Sherri L.; Angell, William

    2013-01-01

    Introduction Radon is the second leading cause of lung cancer among smokers and the leading cause among nonsmokers. The US Environmental Protection Agency recommends that every home be tested for radon. Comprehensive Cancer Control (CCC) programs develop cancer coalitions that coordinate funding and resources to focus on cancer activities that are recorded in cancer plans. Radon tests, remediation, and radon mitigation techniques are relatively inexpensive, but it is unclear whether coalitions recognize radon as an important carcinogen. Methods We reviewed 65 cancer plans created from 2005 through 2011 for the terms “radon,” “radiation,” or “lung.” Plan activities were categorized as radon awareness, home testing, remediation, supporting radon policy activities, or policy evaluation. We also reviewed each CCC program’s most recent progress report. Cancer plan content was reviewed to assess alignment with existing radon-specific policies in each state. Results Twenty-seven of the plans reviewed (42%) had radon-specific terminology. Improving awareness of radon was included in all 27 plans; also included were home testing (n = 21), remediation (n = 11), support radon policy activities (n = 13), and policy evaluation (n = 1). Three plans noted current engagement in radon activities. Thirty states had radon-specific laws; most (n = 21) were related to radon professional licensure. Eleven states had cancer plan activities that aligned with existing state radon laws. Conclusion Although several states have radon-specific policies, approximately half of cancer coalitions may not be aware of radon as a public health issue. CCC-developed cancer coalitions and plans should prioritize tobacco control to address lung cancer but should consider addressing radon through partnership with existing radon control programs. PMID:23928457

  17. Digital Architecture Planning Model

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Oxstrand, Johanna Helene; Al Rashdan, Ahmad Yahya Mohammad; Bly, Aaron Douglas

    As part of the U.S. Department of Energy’s Light Water Reactor Sustainability Program, the Digital Architecture (DA) Project focuses on providing a model that nuclear utilities can refer to when planning deployment of advanced technologies. The digital architecture planning model (DAPM) is the methodology for mapping power plant operational and support activities into a DA that unifies all data sources needed by the utilities to operate their plants. The DA is defined as a collection of information technology capabilities needed to support and integrate a wide spectrum of real-time digital capabilities for performance improvements of nuclear power plants. DA canmore » be thought of as integration of the separate instrumentation and control and information systems already in place in nuclear power plants, which are brought together for the purpose of creating new levels of automation in plant work activities. A major objective in DAPM development was to survey all key areas that needed to be reviewed in order for a utility to make knowledgeable decisions regarding needs and plans to implement a DA at the plant. The development was done in two steps. First, researchers surveyed the nuclear industry in order to learn their near-term plans for adopting new advanced capabilities and implementing a network (i.e., wireless and wire) infrastructure throughout the plant, including the power block. Secondly, a literature review covering regulatory documents, industry standards, and technical research reports and articles was conducted. The objective of the review was to identify key areas to be covered by the DAPM, which included the following: 1. The need for a DA and its benefits to the plant 2. Resources required to implement the DA 3. Challenges that need to be addressed and resolved to implement the DA 4. Roles and responsibilities of the DA implementation plan. The DAPM was developed based on results from the survey and the literature review. Model development

  18. Underground Test Area Activity Preemptive Review Guidance Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Farnham, Irene; Rehfeldt, Kenneth

    Preemptive reviews (PERs) of Underground Test Area (UGTA) Activity corrective action unit (CAU) studies are an important and long-maintained quality improvement process. The CAU-specific PER committees provide internal technical review of ongoing work throughout the CAU lifecycle. The reviews, identified in the UGTA Quality Assurance Plan (QAP) (Sections 1.3.5.1 and 3.2), assure work is comprehensive, accurate, in keeping with the state of the art, and consistent with CAU goals. PER committees review various products, including data, documents, software/codes, analyses, and models. PER committees may also review technical briefings including Federal Facility Agreement and Consent Order (FFACO)-required presentations to the Nevadamore » Division of Environmental Protection (NDEP) and presentations supporting key technical decisions (e.g., investigation plans and approaches). PER committees provide technical recommendations to support regulatory decisions that are the responsibility of the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) and NDEP.« less

  19. Improving of technical characteristics of launch vehicles with liquid rocket engines using active onboard de-orbiting systems

    NASA Astrophysics Data System (ADS)

    Trushlyakov, V.; Shatrov, Ya.

    2017-09-01

    In this paper, the analysis of technical requirements (TR) for the development of modern space launch vehicles (LV) with main liquid rocket engines (LRE) is fulfilled in relation to the anthropogenic impact decreasing. Factual technical characteristics on the example of a promising type of rocket ;Soyuz-2.1.v.; are analyzed. Meeting the TR in relation to anthropogenic impact decrease based on the conventional design approach and the content of the onboard system does not prove to be efficient and leads to depreciation of the initial technical characteristics obtained at the first design stage if these requirements are not included. In this concern, it is shown that the implementation of additional active onboard de-orbiting system (AODS) of worked-off stages (WS) into the onboard LV stages systems allows to meet the TR related to the LV environmental characteristics, including fire-explosion safety. In some cases, the orbital payload mass increases.

  20. Plan now to make your retirement active, productive.

    PubMed

    Schlepp, S

    1989-12-01

    In his book Planning to the Years Ahead, Lester I. Tenney, PhD, professor emeritus at Arizona State University, Tempe, links Abraham Maslow's hierarchy of needs to retirement planning. According to Maslow, economic and security needs can be achieved through a family environment (eg, food clothing, shelter), and social acceptance, self-worth, and self-satisfaction can be achieved from social interaction, work, or leisure activities. After the basic needs of food, clothing, and shelter have been achieved, people are able to move to the next level of achieving safety and security. The level of dependency that people have on satisfying these needs through work will determine how well they are at adapting to retirement. The more people depend on work alone, the harder will be the adjustment; people who are less dependent on work will find retirement easier to accept.

  1. Quality Assurance Project Plan for Closure of the Central Facilities Area Sewage Treatment Plant Lagoon 3 and Land Application Area

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lewis, Michael G.

    This quality assurance project plan describes the technical requirements and quality assurance activities of the environmental data collection/analyses operations to close Central Facilities Area Sewage treatment Plant Lagoon 3 and the land application area. It describes the organization and persons involved, the data quality objectives, the analytical procedures, and the specific quality control measures to be employed. All quality assurance project plan activities are implemented to determine whether the results of the sampling and monitoring performed are of the right type, quantity, and quality to satisfy the requirements for closing Lagoon 3 and the land application area.

  2. Career Planning for Trainees and Fellows

    Cancer.gov

    Cancer research fellows and trainees at NCI can gain technical experience and professional skills while planning for academic, government, or industry careers. Learn more about career development at NCI.

  3. Camp Minden Draft QASP and Work Plan for Public Feedback

    EPA Pesticide Factsheets

    ESI has developed these operational plans, technical approaches, and related required resources based upon extensive review and planning for material removal, transportation, staging, and Contained Burn Chamber (CBC) destruction of materials.

  4. Patient Selection and Activity Planning Guide for Selective Internal Radiotherapy With Yttrium-90 Resin Microspheres

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lau, Wan-Yee, E-mail: josephlau@surgery.cuhk.edu.hk; Kennedy, Andrew S.; Department of Biomedical Engineering, North Carolina State University, Raleigh, NC

    Purpose: Selective internal radiotherapy (SIRT) with yttrium-90 ({sup 90}Y) resin microspheres can improve the clinical outcomes for selected patients with inoperable liver cancer. This technique involves intra-arterial delivery of {beta}-emitting microspheres into hepatocellular carcinomas or liver metastases while sparing uninvolved structures. Its unique mode of action, including both {sup 90}Y brachytherapy and embolization of neoplastic microvasculature, necessitates activity planning methods specific to SIRT. Methods and Materials: A panel of clinicians experienced in {sup 90}Y resin microsphere SIRT was convened to integrate clinical experience with the published data to propose an activity planning pathway for radioembolization. Results: Accurate planning is essentialmore » to minimize potentially fatal sequelae such as radiation-induced liver disease while delivering tumoricidal {sup 90}Y activity. Planning methods have included empiric dosing according to degree of tumor involvement, empiric dosing adjusted for the body surface area, and partition model calculations using Medical Internal Radiation Dose principles. It has been recommended that at least two of these methods be compared when calculating the microsphere activity for each patient. Conclusions: Many factors inform {sup 90}Y resin microsphere SIRT activity planning, including the therapeutic intent, tissue and vasculature imaging, tumor and uninvolved liver characteristics, previous therapies, and localization of the microsphere infusion. The influence of each of these factors has been discussed.« less

  5. The importance of work or productive activity in life care planning and case management.

    PubMed

    Reid, Christine; Riddick-Grisham, Susan

    2015-01-01

    The importance of work or productive activity for the well-being, community integration, and quality of life of people living with disabilities is addressed, with implications for life care planning and case management. The role of work or productive activity in our society, and consequences of deprivation if rehabilitation services do not address vocational effects of disabilities, is explored. A continuum of productivity options is introduced; types of vocational rehabilitation assessment processes and interventions are described. The role of vocational rehabilitation services in life care planning and case management is discussed, focusing on quality of life for people living with disabilities. Rehabilitation and health care professionals should understand the importance of work or other productive activity, and support the development of appropriate plans to address those needs among people who have disabilities.

  6. Quality-assurance and data-management plan for water-quality activities in the Kansas Water Science Center, 2014

    USGS Publications Warehouse

    Rasmussen, Teresa J.; Bennett, Trudy J.; Foster, Guy M.; Graham, Jennifer L.; Putnam, James E.

    2014-01-01

    As the Nation’s largest water, earth, and biological science and civilian mapping information agency, the U.S. Geological Survey is relied on to collect high-quality data, and produce factual and impartial interpretive reports. This quality-assurance and data-management plan provides guidance for water-quality activities conducted by the Kansas Water Science Center. Policies and procedures are documented for activities related to planning, collecting, storing, documenting, tracking, verifying, approving, archiving, and disseminating water-quality data. The policies and procedures described in this plan complement quality-assurance plans for continuous water-quality monitoring, surface-water, and groundwater activities in Kansas.

  7. Technical Note: Millimeter precision in ultrasound based patient positioning: Experimental quantification of inherent technical limitations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ballhausen, Hendrik, E-mail: hendrik.ballhausen@med.uni-muenchen.de; Hieber, Sheila; Li, Minglun

    2014-08-15

    Purpose: To identify the relevant technical sources of error of a system based on three-dimensional ultrasound (3D US) for patient positioning in external beam radiotherapy. To quantify these sources of error in a controlled laboratory setting. To estimate the resulting end-to-end geometric precision of the intramodality protocol. Methods: Two identical free-hand 3D US systems at both the planning-CT and the treatment room were calibrated to the laboratory frame of reference. Every step of the calibration chain was repeated multiple times to estimate its contribution to overall systematic and random error. Optimal margins were computed given the identified and quantified systematicmore » and random errors. Results: In descending order of magnitude, the identified and quantified sources of error were: alignment of calibration phantom to laser marks 0.78 mm, alignment of lasers in treatment vs planning room 0.51 mm, calibration and tracking of 3D US probe 0.49 mm, alignment of stereoscopic infrared camera to calibration phantom 0.03 mm. Under ideal laboratory conditions, these errors are expected to limit ultrasound-based positioning to an accuracy of 1.05 mm radially. Conclusions: The investigated 3D ultrasound system achieves an intramodal accuracy of about 1 mm radially in a controlled laboratory setting. The identified systematic and random errors require an optimal clinical tumor volume to planning target volume margin of about 3 mm. These inherent technical limitations do not prevent clinical use, including hypofractionation or stereotactic body radiation therapy.« less

  8. 32 CFR 203.10 - Eligible activities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... with technical reports that summarize data and support cleanup decisions. Technical assistance may be provided to review plans and interpret technical reports for community members of RABs and TRCs. These...) MISCELLANEOUS TECHNICAL ASSISTANCE FOR PUBLIC PARTICIPATION (TAPP) IN DEFENSE ENVIRONMENTAL RESTORATION...

  9. 32 CFR 203.10 - Eligible activities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... with technical reports that summarize data and support cleanup decisions. Technical assistance may be provided to review plans and interpret technical reports for community members of RABs and TRCs. These...) MISCELLANEOUS TECHNICAL ASSISTANCE FOR PUBLIC PARTICIPATION (TAPP) IN DEFENSE ENVIRONMENTAL RESTORATION...

  10. 32 CFR 203.10 - Eligible activities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... with technical reports that summarize data and support cleanup decisions. Technical assistance may be provided to review plans and interpret technical reports for community members of RABs and TRCs. These...) MISCELLANEOUS TECHNICAL ASSISTANCE FOR PUBLIC PARTICIPATION (TAPP) IN DEFENSE ENVIRONMENTAL RESTORATION...

  11. The Austrian radon activities on the way to the national radon action plan.

    PubMed

    Gruber, V; Ringer, W; Wurm, G; Haider, W

    2014-07-01

    Based on the new Euratom Basic Safety Standards (BSS), all EU member states will be obliged to design a strategy to address long-term risks from radon exposure, which is laid down in the 'national radon action plan'. In Austria, the National Radon Centre is responsible for the development of the action plan. This paper presents the current and planned radon protection activities on the way to establish the radon action plan--like the national radon database, the definition of radon risk areas by improving the existing radon map, as well as strategies and activities to increase the radon awareness of the public and decision-makers and to involve the building sector. The impact of and the need for actions caused by the BSS requirements on the Austrian radon legislation, strategy and programme are discussed. © The Author 2014. Published by Oxford University Press. All rights reserved. For Permissions, please email: journals.permissions@oup.com.

  12. The National Shipbuilding Research Program. Proceedings of the IREAPS Technical Symposium. Paper No. 24: MAPLIS: An On-Line Materials Resource Planning System Tailored to the Shipbuilding and Offshore Industry

    DTIC Science & Technology

    1982-09-01

    Offshore Industry U.S. DEPARTMENT OF THE NAVY CARDEROCK DIVISION, NAVAL SURFACE WARFARE CENTER Report Documentation Page Form ApprovedOMB No . 0704...INNOVATION MARINE INDUSTRY STANDARDS WELDING INDUSTRIAL ENGINEERING EDUCATION AND TRAINING THE NATIONAL SHIPBUILDING RESEARCH PROGRAM September 1982 NSRP 0009...Proceedings of the IREAPS Technical Symposium Paper No . 24: MAPLIS: An On-Line Materials Resource Planning System Tailored to the Shipbuilding and

  13. Autobiographical Planning and the Brain: Activation and Its Modulation by Qualitative Features.

    PubMed

    Spreng, R Nathan; Gerlach, Kathy D; Turner, Gary R; Schacter, Daniel L

    2015-11-01

    To engage in purposeful behavior, it is important to make plans, which organize subsequent actions. Most studies of planning involve "look-ahead" puzzle tasks that are unrelated to personal goals. We developed a task to assess autobiographical planning, which involves the formulation of personal plans in response to real-world goals, and examined autobiographical planning in 63 adults during fMRI scanning. Autobiographical planning was found to engage the default network, including medial-temporal lobe and midline structures, and executive control regions in lateral pFC and parietal cortex and caudate. To examine how specific qualitative features of autobiographical plans modulate neural activity, we performed parametric modulation analyses. Ratings of plan detail, novelty, temporal distance, ease of plan formulation, difficulty in goal completion, and confidence in goal accomplishment were used as covariates in six hierarchical linear regression models. This modeling procedure removed shared variance among the ratings, allowing us to determine the independent relationship between ratings of interest and trial-wise BOLD signal. We found that specific autobiographical planning, describing a detailed, achievable, and actionable planning process for attaining a clearly envisioned future, recruited both default and frontoparietal brain regions. In contrast, abstract autobiographical planning, plans that were constructed from more generalized semantic or affective representations of a less tangible and distant future, involved interactions among default, sensory perceptual, and limbic brain structures. Specific qualities of autobiographical plans are important predictors of default and frontoparietal control network engagement during plan formation and reflect the contribution of mnemonic and executive control processes to autobiographical planning.

  14. Technical Evaluation Motor No. 7 (TEM-7)

    NASA Technical Reports Server (NTRS)

    Hughes, Phil

    1991-01-01

    The Technical Evaluation Motor No. 7 (TEM-7) test was a full-scale, full duration static test firing of a high performance motor-configuration solid rocket motor with nozzle vectoring. The final test report documents the procedures, performance, and results of the static test firing of TEM-7. All observations, discussions, conclusions, and recommendations included in the report are complete and final except for the TEM-7 fixed housing unbond investigation. A presentation and discussion of TEM-7 performance, anomalies, and test result concurrence with the objectives outlined in CTP-0107, Rev A, Space Shuttle Technical Evaluation Motor No. 7 (TEM-7) Static Fire Test Plan are included.

  15. 41 CFR 105-50.001-5 - Specialized or technical services.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., technical tests and evaluations, technical information, training activities, surveys, reports, documents... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Specialized or technical... TECHNICAL SERVICES TO STATE AND LOCAL UNITS OF GOVERNMENT § 105-50.001-5 Specialized or technical services...

  16. Important Non-Technical Skills in Video-Assisted Thoracoscopic Surgery Lobectomy: Team Perspectives.

    PubMed

    Gjeraa, Kirsten; Mundt, Anna S; Spanager, Lene; Hansen, Henrik J; Konge, Lars; Petersen, René H; Østergaard, Doris

    2017-07-01

    Safety in the operating room is dependent on the team's non-technical skills. The importance of non-technical skills appears to be different for minimally invasive surgery as compared with open surgery. The aim of this study was to identify which non-technical skills are perceived by team members to be most important for patient safety, in the setting of video-assisted thoracoscopic surgery (VATS) lobectomy. This was an explorative, semistructured interview-based study with 21 participants from all four thoracic surgery centers in Denmark that perform VATS lobectomy. Data analysis was deductive, and directed content analysis was used to code the text into the Oxford Non-Technical Skills system for evaluating operating teams' non-technical skills. The most important non-technical skills described by the VATS teams were planning and preparation, situation awareness, problem solving, leadership, risk assessment, and teamwork. These non-technical skills enabled the team to achieve shared mental models, which in turn facilitated their efforts to anticipate next steps. This was viewed as important by the participants as they saw VATS lobectomy as a high-risk procedure with complementary and overlapping scopes of practice between surgical and anesthesia subteams. This study identified six non-technical skills that serve as the foundation for shared mental models of the patient, the current situation, and team resources. These findings contribute three important additions to the shared mental model construct: planning and preparation, risk assessment, and leadership. Shared mental models are crucial for patient safety because they enable VATS teams to anticipate problems through adaptive patterns of both implicit and explicit coordination. Copyright © 2017 The Society of Thoracic Surgeons. Published by Elsevier Inc. All rights reserved.

  17. Developing non-technical ward-round skills.

    PubMed

    Harvey, Rachel; Mellanby, Edward; Dearden, Effie; Medjoub, Karima; Edgar, Simon

    2015-10-01

    Conducting clinical 'rounds' is one of the most onerous and important duties that every junior doctor is expected to perform. There is evidence that newly qualified doctors are not adequately prepared by their undergraduate experiences for this task. The aim of this study was to analyse the challenges pertaining to non-technical skills that students would face during ward rounds, and to create a model that facilitates the transition from medical student to doctor. A total of 217 final-year medical students completed a simulated ward round. Free-text responses were analysed using template analysis applying an a priori template developed from the literature by the research team. This drew on the generic categories of non-technical skills suggested by Flin et al. Ninety-seven per cent of students agreed or strongly agreed that the simulated ward round improved their insight into the challenges of ward rounds and their perceived ability to work efficiently as an active member of the ward round. The responding students (206) submitted written feedback describing the learning that they planned to use: 800 learning points were recorded, and all could be categorised into one of seven non-technical skills. Conducting clinical 'rounds' is one of the most onerous and important duties that every junior doctor is expected to perform We believe that improved task efficiency and insight into the challenges of the ward round gained by medical students will lead to an enhancement in performance during clinical rounds, and will have a positive impact on patient safety. We would suggest that undergraduate medical schools consider this model in the preparation for the clinical practice element of the curriculum. © 2015 John Wiley & Sons Ltd.

  18. Commissioning and comprehensive quality assurance of commercial 3D treatment planning system using IAEA Technical Report Series-430.

    PubMed

    Jamema, S V; Upreti, R R; Sharma, S; Deshpande, D D

    2008-09-01

    The purpose of this work is to report the results of commissioning and to establish a quality assurance (QA) program for commercial 3D treatment planning system (TPS) based on IAEA Technical Report Series 430. Eclipse v 7.3.10, (Varian Medical Systems, Palo Alto, CA, U.S.A.) TPS was commissioned for a Clinac 6EX (Varian Medical Systems, Palo Alto, CA, USA) linear accelerator. CT images of a phantom with various known in-homogeneities were acquired. The images were transferred to TPS and tested for various parameters related to patient data acquisition, anatomical modeling, plan evaluation and dose calculation. Dosimetric parameters including open, asymmetric and wedged shaped fields, oblique incidence, buildup region behavior and SSD dependence were evaluated. Representative clinical cases were tested for MU calculation and point doses. The maximum variation between the measured and the known CT numbers was 20 +/- 11.7 HU (1 SD). The results of all non-dosimetric tests were found within tolerance, however expansion at the sharp corners was found distorted. The accuracy of the DVH calculations depends on the grid size. TPS calculations of all the dosimetric parameters were in good agreement with the measured values, however for asymmetric open and wedged fields, few points were found out of tolerance. Smaller grid size calculation showed better agreement of dose calculation in the build-up region. Independent tests for MU calculation showed a variation within +/-2% (relative to planning system), meanwhile variation of 3.0% was observed when the central axis was blocked. The test results were in agreement with the tolerance specified by IAEA TRS 430. A subset of the commissioning tests has been identified as a baseline data for an ongoing QA program.

  19. Embedding Agile Practices within a Plan-Driven Hierarchical Project Life Cycle

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Millard, W. David; Johnson, Daniel M.; Henderson, John M.

    2014-07-28

    Organizations use structured, plan-driven approaches to provide continuity, direction, and control to large, multi-year programs. Projects within these programs vary greatly in size, complexity, level of maturity, technical risk, and clarity of the development objectives. Organizations that perform exploratory research, evolutionary development, and other R&D activities can obtain the benefits of Agile practices without losing the benefits of their program’s overarching plan-driven structure. This paper describes application of Agile development methods on a large plan-driven sensor integration program. While the client employed plan-driven, requirements flow-down methodologies, tight project schedules and complex interfaces called for frequent end-to-end demonstrations to provide feedbackmore » during system development. The development process maintained the many benefits of plan-driven project execution with the rapid prototyping, integration, demonstration, and client feedback possible through Agile development methods. This paper also describes some of the tools and implementing mechanisms used to transition between and take advantage of each methodology, and presents lessons learned from the project management, system engineering, and developer’s perspectives.« less

  20. 13 CFR 146.205 - Professional and technical services.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Professional and technical... RESTRICTIONS ON LOBBYING Activities by Own Employees § 146.205 Professional and technical services. (a) The... technical services rendered directly in the preparation, submission, or negotiation of any bid, proposal, or...

  1. Innovative Approaches to Teaching Technical Communication

    ERIC Educational Resources Information Center

    Bridgeford, Tracy, Ed.; Kitalong, Karla Saari, Ed.; Selfe, Dickie, Ed.

    2004-01-01

    "Innovative Approaches to Teaching Technical Communication" offers a variety of activities, projects, and approaches to energize pedagogy in technical communication and to provide a constructive critique of current practice. A practical collection, the approaches recommended here are readily adaptable to a range of technological and institutional…

  2. The 1999 UNCOPUOS "Technical report on space debris" and the new work plan on space debris (2002 - 2005): perspectives and legal consequences

    NASA Astrophysics Data System (ADS)

    Benkö, Marietta; Schrogl, Kai-Uwe

    2001-10-01

    In February 1999, the Scientific and Technical Subcommittee (STSC) of the UN Committee on the Peaceful Uses of Outer Space (UNCOPUOS) adopted a "Technical Report on Space Debris". This was the result of intensive negotiations during a multi-year workplan on space debris, which had been the centerpiece of the technical work of the STSC during these years. The Report is the first document on space debris, presenting the status of space debris research and the problems resulting from space debris. It has the status of an analysis accepted by all governments. Following its adoption, the Report was presented to UNISPACE III and provided the basis for discussions in this Inter-governmental Conference as well as in the Technical Forum, which - at the same time - dealt with the technical as well as the legal aspects of the exploration and use of outer space. The adoption of the Conference Report finalized the workplan in the STSC, but the subject of space debris still remains on the agenda, where until now every year a special aspect is discussed in detail. The Report does not suggest the establishment of an agenda item "space debris" in the UNCOPUOS Legal Subcommittee (LSC). It is very reluctant in even mentioning legal aspects of the space debris issue. The strict and full concentration on technical aspects was a precondition made by a number of Member States for their constructive participation in the elaboration to establish an agenda item on space debris there, were completely detached from that process. Those, who had expected that the adoption of the Report would inevitably lead to formal negotiations in the LSC were deceived so far. Nevertheless, the Report provides a number of starting points for drafting regulation concerning the prevention of space debris as well as debris mitigation measures which also built on work already done by the Inter-Agency Space Debris Coordination Committee (IADC) and its member agencies. This paper describes the status of the

  3. 77 FR 35114 - Agency Information Collection (NCA PreNeed Burial Planning) Activity Under OMB Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-12

    ...Need Burial Planning) Activity Under OMB Review AGENCY: National Cemetery Administration, Department of... PreNeed Burial Planning, VA Form 40-10007. OMB Control Number: 2900--New. Type of Review: New... members, and their eligible family members with planning for burial in a VA national cemetery. This...

  4. Third International Mathematics and Science Study 1999 Video Study Technical Report: Volume 2--Science. Technical Report. NCES 2011-049

    ERIC Educational Resources Information Center

    Garnier, Helen E.; Lemmens, Meike; Druker, Stephen L.; Roth, Kathleen J.

    2011-01-01

    This second volume of the Third International Mathematics and Science Study (TIMSS) 1999 Video Study Technical Report focuses on every aspect of the planning, implementation, processing, analysis, and reporting of the science components of the TIMSS 1999 Video Study. The report is intended to serve as a record of the actions and documentation of…

  5. 34 CFR 200.27 - Development of a schoolwide program plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Development of a schoolwide program plan. (a)(1) A school operating a schoolwide program must develop a comprehensive plan to improve teaching and learning throughout the school. (2) The school must develop the comprehensive plan in consultation with the LEA and its school support team or other technical assistance...

  6. 34 CFR 200.27 - Development of a schoolwide program plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Development of a schoolwide program plan. (a)(1) A school operating a schoolwide program must develop a comprehensive plan to improve teaching and learning throughout the school. (2) The school must develop the comprehensive plan in consultation with the LEA and its school support team or other technical assistance...

  7. 34 CFR 200.27 - Development of a schoolwide program plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Development of a schoolwide program plan. (a)(1) A school operating a schoolwide program must develop a comprehensive plan to improve teaching and learning throughout the school. (2) The school must develop the comprehensive plan in consultation with the LEA and its school support team or other technical assistance...

  8. 34 CFR 200.27 - Development of a schoolwide program plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Development of a schoolwide program plan. (a)(1) A school operating a schoolwide program must develop a comprehensive plan to improve teaching and learning throughout the school. (2) The school must develop the comprehensive plan in consultation with the LEA and its school support team or other technical assistance...

  9. 39 CFR 3002.12 - Office of Rates, Analysis, and Planning.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 39 Postal Service 1 2011-07-01 2011-07-01 false Office of Rates, Analysis, and Planning. 3002.12... Rates, Analysis, and Planning. (a) The Office of Rates, Analysis, and Planning is responsible for technical (as opposed to legal) analysis and the formulation of policy recommendations for the Commission...

  10. 39 CFR 3002.12 - Office of Rates, Analysis, and Planning.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 39 Postal Service 1 2012-07-01 2012-07-01 false Office of Rates, Analysis, and Planning. 3002.12... Rates, Analysis, and Planning. (a) The Office of Rates, Analysis, and Planning is responsible for technical (as opposed to legal) analysis and the formulation of policy recommendations for the Commission...

  11. The importance of work or productive activity in life care planning and case management

    PubMed Central

    Reid, Christine; Riddick-Grisham, Susan

    2015-01-01

    Abstract INTRODUCTION: The importance of work or productive activity for the well-being, community integration, and quality of life of people living with disabilities is addressed, with implications for life care planning and case management. BACKGROUND: The role of work or productive activity in our society, and consequences of deprivation if rehabilitation services do not address vocational effects of disabilities, is explored. A continuum of productivity options is introduced; types of vocational rehabilitation assessment processes and interventions are described. PURPOSE: The role of vocational rehabilitation services in life care planning and case management is discussed, focusing on quality of life for people living with disabilities. CONCLUSION: Rehabilitation and health care professionals should understand the importance of work or other productive activity, and support the development of appropriate plans to address those needs among people who have disabilities. PMID:26409330

  12. Elaboration of technology organizational models of constructing high-rise buildings in plans of construction organization

    NASA Astrophysics Data System (ADS)

    Osipenkova, Irina; Simankina, Tatyana; Syrygina, Taisiia; Lukinov, Vitaliy

    2018-03-01

    This article represents features of the elaboration of technology organizational models of high-rise building construction in technology organizational documentation on the example of the plan of construction organization. Some examples of enhancing the effectiveness of high-rise building construction based on developments of several options of the organizational and technological plan are examined. Qualitative technology organizational documentation allows to increase the competitiveness of construction companies and provides prime cost of construction and assembly works reductions. Emphasis is placed on the necessity to comply with the principle of comprehensiveness of engineering, scientific and research works, development activities and scientific and technical support.

  13. Health Plan Performance Measurement within Medicare Subvention.

    DTIC Science & Technology

    1998-06-01

    the causes of poor performance (Siren & Laffel, 1996). Although outcomes measures such as nosocomial infection rates, admission rates for select...defined. Traditional outcomes measures include infection rates, morbidity, and mortality. The problem with these traditional measures is... Maternal /Child Care Indicators Nursing Staffing Indicators Outcome Indicators Technical Outcomes Plan Performance Stability of Health Plan

  14. Chemistry, manufacturing and control (CMC) and clinical trial technical support for influenza vaccine manufacturers.

    PubMed

    Wahid, Rahnuma; Holt, Renee; Hjorth, Richard; Berlanda Scorza, Francesco

    2016-10-26

    With the support of the Biomedical Advanced Research and Development Authority (BARDA) of the US Department of Health and Human Services, PATH has contributed to the World Health Organization's (WHO's) Global Action Plan for Influenza Vaccines (GAP) by providing technical and clinical assistance to several developing country vaccine manufacturers (DCVMs). GAP builds regionally based independent and sustainable influenza vaccine production capacity to mitigate the overall global shortage of influenza vaccines. The program also ensures adequate influenza vaccine manufacturing capacity in the event of an influenza pandemic. Since 2009, PATH has worked closely with two DCVMs in Vietnam: the Institute of Vaccines and Medical Biologicals (IVAC) and VABIOTECH. Beginning in 2013, PATH also began working with Torlak Institute in Serbia; Instituto Butantan in Brazil; Serum Institute of India Private Ltd. in India; and Changchun BCHT Biotechnology Co. (BCHT) in China. The DCVMs supported under the GAP program all had existing influenza vaccine manufacturing capability and required technical support from PATH to improve vaccine yield, process efficiency, and product formulation. PATH has provided customized technical support for the manufacturing process to each DCVM based on their respective requirements. Additionally, PATH, working with BARDA and WHO, supported several DCVMs in the clinical development of influenza vaccine candidates progressing toward national licensure or WHO prequalification. As a result of the activities outlined in this review, several companies were able to make excellent progress in developing state-of-the-art manufacturing processes and completing early phase clinical trials. Licensure trials are currently ongoing or planned for several DCVMs. Copyright © 2016 Elsevier Ltd. All rights reserved.

  15. 76 FR 72715 - Agency Information Collection Activities: Cargo Manifest/Declaration, Stow Plan, Container Status...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-25

    ... Activities: Cargo Manifest/ Declaration, Stow Plan, Container Status Messages and Importer Security Filing... concerning the following information collection. Title: Cargo Manifest/Declaration, Stow Plan, Container... and other Federal agencies to comment on an information collection requirement concerning the Cargo...

  16. 77 FR 6135 - Agency Information Collection Activities: Cargo Manifest/Declaration, Stow Plan, Container Status...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-07

    ... Activities: Cargo Manifest/ Declaration, Stow Plan, Container Status Messages and Importer Security Filing... the Paperwork Reduction Act: Cargo Manifest/Declaration, Stow Plan, Container Status Messages and..., mechanical, or other technological techniques or other forms of information. Title: Cargo Manifest...

  17. Choice-Making in Vocational Activities Planning: Recommendations from Job Coaches

    ERIC Educational Resources Information Center

    Cobigo, Virginie; Lachapelle, Yves; Morin, Diane

    2010-01-01

    Choice in the job seeking process may lead to increased satisfaction with the chosen job, and improve attention, performance, and motivation. Consequently, providing opportunities to express choices and interests while planning vocational activities is a key factor in achieving employment outcomes. Despite their commitment to promoting…

  18. 77 FR 34354 - Notice Inviting Informal Public Comment on Training and Technical Assistance and Disability...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-11

    ... and Technical Assistance and Disability Inclusion Programming AGENCY: Corporation for National and... implementation of a unified training and technical assistance (TTA) strategy and disability inclusion programming... to CNCS as we plan and prepare for this work. We will accept comments in writing, as described below...

  19. 34 CFR 300.601 - State performance plans and data collection.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 2 2011-07-01 2010-07-01 true State performance plans and data collection. 300.601... Monitoring, Technical Assistance, and Enforcement § 300.601 State performance plans and data collection. (a) General. Not later than December 3, 2005, each State must have in place a performance plan that evaluates...

  20. Environmental restoration and waste management five year plan, fiscal years 1994--1998. Executive summary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    In March 1989, Secretary of Energy James D. Watkins outlined his vision for a changed Department of Energy (DOE) culture. This culture is one of envirorunental responsibility, increased knowledge and involvement in environmental management, a new openness to public input, and overall accountability to the Nation for its actions. Secretary Watkins also requested all the near-term activities necessary to bring DOEactivities into compliance with all applicable environmental requirements to be detailed in one plan. The Five-Year Plan was to be based on a ``bottom up`` approach to planning by using Activity Data Sheets to collect financial and technical information atmore » the installation level. Over the past three years, the Five-Year Plan has evolved into the primary planning tool for the DOE Environmental Restoration and Waste Management Program, looking beyond the current three-year Federal budget horizon. The FY 1994--1998 Five-Year Plan demonstrates DOE`s commitment to a culture based on the principles of openness, responsiveness, and accountability; reports on the progress made in carrying out DOE`s environmental mission; identifies what must be accomplished during a five-year planning period; and describes strategies for achieving critical program objectives. This plan represents another step towards the implementation of the culture change Secretary Watkins envisioned. The Five-Year Plan is not exclusively focused on near-term activities. Italso expresses the DOE commitment to a 30-year goal for the cleanup of the 1989 inventory of inactive sites. The FY 1994--1998 Five-Year Plan reiterates the DOE commitment to meeting this and other important environmental goals.« less