Sample records for technical project officer

  1. Technical Support Services for the Office of Naval Research Littoral Warfare Advanced Development Project

    DTIC Science & Technology

    2005-09-30

    Technical Support Services for the Office of Naval Research Littoral Warfare Advanced Development Project William R. Metzger Marine...Support Services for the Office of Naval Research Littoral Warfare Advanced Development Project 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT

  2. 48 CFR 2052.215-71 - Project officer authority.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... directive whatever. (d) All technical directions must be issued in writing by the project officer or must be... advise the contractor in writing that, in the contracting officer's opinion, the technical direction is... subject to the technical direction of the NRC project officer. The term technical direction is defined to...

  3. 48 CFR 301.607-78 - Contracting Officer designation of a Program/Project Manager as the Contracting Officer's...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... designation of a Program/Project Manager as the Contracting Officer's Technical Representative. 301.607-78... Contracting Officer designation of a Program/Project Manager as the Contracting Officer's Technical... acquisition. However, for those individuals serving as a Program or Project Manager under a FAC-P/PM...

  4. 48 CFR 2052.215-71 - Project officer authority.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... of the work description. (3) Review and, where required by the contract, approve technical reports... subject to the technical direction of the NRC project officer. The term technical direction is defined to include the following: (1) Technical direction to the contractor which shifts work emphasis between areas...

  5. 48 CFR 2052.215-71 - Project officer authority.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... of the work description. (3) Review and, where required by the contract, approve technical reports... subject to the technical direction of the NRC project officer. The term technical direction is defined to include the following: (1) Technical direction to the contractor which shifts work emphasis between areas...

  6. 48 CFR 2052.215-71 - Project officer authority.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... of the work description. (3) Review and, where required by the contract, approve technical reports... subject to the technical direction of the NRC project officer. The term technical direction is defined to include the following: (1) Technical direction to the contractor which shifts work emphasis between areas...

  7. 48 CFR 2052.215-71 - Project officer authority.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... of the work description. (3) Review and, where required by the contract, approve technical reports... subject to the technical direction of the NRC project officer. The term technical direction is defined to include the following: (1) Technical direction to the contractor which shifts work emphasis between areas...

  8. 14 CFR 1274.920 - Responsibilities of the NASA technical officer.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Responsibilities of the NASA technical... Responsibilities of the NASA technical officer. Responsibilities of the NASA Technical Officer July 2002 (a) The NASA Agreement Officer and Technical Officer for this cooperative agreement are identified on the...

  9. 14 CFR 1274.920 - Responsibilities of the NASA technical officer.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Responsibilities of the NASA technical... Responsibilities of the NASA technical officer. Responsibilities of the NASA Technical Officer July 2002 (a) The NASA Agreement Officer and Technical Officer for this cooperative agreement are identified on the...

  10. 14 CFR 1274.920 - Responsibilities of the NASA technical officer.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true Responsibilities of the NASA technical... Responsibilities of the NASA technical officer. Responsibilities of the NASA Technical Officer July 2002 (a) The NASA Agreement Officer and Technical Officer for this cooperative agreement are identified on the...

  11. 14 CFR 1274.920 - Responsibilities of the NASA technical officer.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false Responsibilities of the NASA technical... Responsibilities of the NASA technical officer. Responsibilities of the NASA Technical Officer July 2002 (a) The NASA Agreement Officer and Technical Officer for this cooperative agreement are identified on the...

  12. 48 CFR 719.271-5 - Cognizant technical officers.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... officers. 719.271-5 Section 719.271-5 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Policies 719.271-5 Cognizant technical officers... cognizant technical officers can affect the opportunity of small business to participate equitably...

  13. 14 CFR § 1274.920 - Responsibilities of the NASA technical officer.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false Responsibilities of the NASA technical... Responsibilities of the NASA technical officer. Responsibilities of the NASA Technical Officer July 2002 (a) The NASA Agreement Officer and Technical Officer for this cooperative agreement are identified on the...

  14. 48 CFR 719.271-5 - Cognizant technical officers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... DEVELOPMENT SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Policies 719.271-5 Cognizant technical officers. Since the procurement process starts with the establishment of a requirement, the actions of the cognizant technical officers can affect the opportunity of small business to participate equitably...

  15. Final Technical Report- Virginia Solar Pathways Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bond, Katharine; Cosby, Sarah

    This Report provides a technical review of the final results of a funding award to Virginia Electric and Power Company (Dominion Energy Virginia (DEV) or the Company) for a project under the U.S. Department of Energy’s Solar Energy Technologies Office. The three-year project was formally known as the Virginia Solar Pathways Project (VSPP or the Project). The purpose of the VSPP was to develop a collaborative utility-administered solar strategy (Solar Strategy) for DEV’s service territory in the Commonwealth that could serve as a replicable model for other states with similar policy environments.

  16. 48 CFR 1252.242-73 - Contracting officer's technical representative.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... technical representative. 1252.242-73 Section 1252.242-73 Federal Acquisition Regulations System DEPARTMENT... and Clauses 1252.242-73 Contracting officer's technical representative. As prescribed in (TAR) 48 CFR 1242.7000(d), insert the following clause: Contracting Officer's Technical Representative (OCT 1994) (a...

  17. 48 CFR 3052.242-72 - Contracting officer's technical representative.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... functions of a technical nature. The Contracting Officer will provide a written notice of such designation... technical representative. 3052.242-72 Section 3052.242-72 Federal Acquisition Regulations System DEPARTMENT... PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 3052.242-72 Contracting officer's technical...

  18. 76 FR 79675 - Pomperaug Hydro Project Andrew Peklo III; Notice of Site Visit and Technical Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12790-001] Pomperaug Hydro Project Andrew Peklo III; Notice of Site Visit and Technical Meeting On January 18, 2012, Office of Energy Projects staff will hold a site visit and technical meeting for the proposed Pomperaug Hydro Project (FERC...

  19. Contracting Officer's Technical Representatives

    NASA Technical Reports Server (NTRS)

    Brisbin, Steve

    1997-01-01

    The Breakout Session is a traditional conference instrument used by the NASA Occupational Health Program (OHP) as a method to convene people with common interests. Typically these sessions provide discussion of current topics of high priority and currency and allow multiple views and opinions to be shared and evaluated by all participants. Since the Contracting Officer's Technical Representatives (COTRs) occupy the technical focus of support contract management, this particular group, attended by 20 representatives, addressed issues and topics at the forefront of operational concerns.

  20. FIFRA Project Officers Manual

    EPA Pesticide Factsheets

    The FIFRA Project Officers Manual provides guidance to new as well as experienced project officers in the management of grants and cooperative agreements under the Federal Insecticide, Fungicide and Rodenticide Act.

  1. Support of US CLIVAR Project Office 2012

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cummings, Donna

    Director of JOSS, supervised the U.S. CLIVAR Project Office Director and helped direct the officer to enhance the goals and objectives of the U.S. CLIVAR Project and budget. Financial Manager of JOSS, worked to complete proposals and monitor compliance with award requirements and funding limitations and ensure the U.S. CLIVAR Project Office complied with UCAR policies and procedures. Project Coordinator administered the funding for the U.S. CLIVAR Project Office and was responsible for coordinating special projects that required additional support from JOSS technical staff. These projects included activities such as website updates, technology upgrades, production of printed reports, and developmentmore » of graphic elements like logos. Web Developer worked both on web development and graphic work and the work consisted of the following: Maintaining the site ? installing updates to Drupal CMS (Content Management System). Creating new templates for webpages and styling them with CSS and JavaScript/jQuery code. Fixing the styling on webpages that the content contributor/manager (Jenn Mays) created and has had trouble with. Creating new web forms for abstract uploading, subscriptions, and meeting registrations. Created 4 webpages for the ?ASP: Key Uncertainties in the Global Carbon-Cycle? meeting. Developed a document review form, instruction webpages, login redirect, dynamic table with form submissions for the US CLIVAR SSC Science Plan Document Review. This was open to the public from June 12, 2013 until July 10, 2013. During this time the user accounts had to be checked (daily) that were created by the public, to delete any spam ones. Graphics work: preparing images for general use on webpages, webpage banners, and for meeting name badges, creating a US CLIVAR letterhead, redesigning the US AMOC logo. System Administrator spent time working on the migration of the US CLIVAR site from the USGCRP office to UCAR here Boulder. This was done to increase the general

  2. Technical Support for Contaminated Sites

    EPA Science Inventory

    In 1987, the U.S. Environmental Protection Agency’s (EPA) Office of Research and Development (ORD), Office of Land and Emergency Management, and EPA Regional waste management offices established the Technical Support Project. The creation of the Technical Support Project enabled...

  3. The Office of Environmental Management technical reports: a bibliography

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-07-01

    The Office of Environmental Management`s (EM) technical reports bibliography is an annual publication that contains information on scientific and technical reports sponsored by the Office of Environmental Management added to the Energy Science and Technology Database from July 1, 1995 through Sept. 30, 1996. This information is divided into the following categories: Focus Areas and Crosscutting Programs. Support Programs, Technology Integration and International Technology Exchange are now included in the General category. EM`s Office of Science and Technology sponsors this bibliography.

  4. THE OFFICE OF AEROSPACE RESEARCH SCIENTIFIC AND TECHNICAL INFORMATION PROGRAM

    DTIC Science & Technology

    The document outlines the mission and organization of the Office of Aerospace Research (OAR), then describes how its principal product, scientific...effective technical information program, are documented by examples. The role of the Office of Scientific and Technical Information within OAR as performed

  5. Annual Technical Report to the Office of Naval Research.

    DTIC Science & Technology

    1981-11-01

    7 A A1 208 MICHIGAN TECHNOLOGICAL UNI V HOUGHTON DEP T OF MFTALLU--ETC IG 11/6 ANNUAL TECHNICAL REPORT TO THE OFFICE OF NAVAL RESEARCH(U) NOV 81 D...A KOSS N00014-76-C-0037 UNCLASSIFIED NLmhEIIIIIIEIIII ElllllEllEllEE ANNUAL TECHNICAL REPORT TO THE OFFICE OF NAVAL RESEARCH CONTRACT No, N00014-76-C... the Office of Naval Research through Contract No. N00014-76-C-0037, NR 031-756. 22 References 1. K. Okazaki, M. Kagawa, and H. Conrad, Acta. Met. 27

  6. Annual Report Fiscal Year 1980--Office of Technical Assistance and Training.

    ERIC Educational Resources Information Center

    Bureau of Indian Affairs, Brigham City, UT.

    The technical assistance and training services which the Office of Technical Assistance and Training (OTAT) offered for Alaskan Natives, Indian Tribes, and the Bureau of Indian Affairs personnel during 1980 are highlighted in this report. The Real Property Management and the Forestry training programs, developed in cooperation with the Office of…

  7. Final Technical Report, Wind Generator Project (Ann Arbor)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Geisler, Nathan

    A Final Technical Report (57 pages) describing educational exhibits and devices focused on wind energy, and related outreach activities and programs. Project partnership includes the City of Ann Arbor, MI and the Ann Arbor Hands-on Museum, along with additional sub-recipients, and U.S. Department of Energy/Office of Energy Efficiency and Renewable Energy (EERE). Report relays key milestones and sub-tasks as well as numerous graphics and images of five (5) transportable wind energy demonstration devices and five (5) wind energy exhibits designed and constructed between 2014 and 2016 for transport and use by the Ann Arbor Hands-on Museum.

  8. Technical Support for Contaminated Sites | Science Inventory ...

    EPA Pesticide Factsheets

    In 1987, the U.S. Environmental Protection Agency’s (EPA) Office of Research and Development (ORD), Office of Land and Emergency Management, and EPA Regional waste management offices established the Technical Support Project. The creation of the Technical Support Project enabled ORD to provide effective technical assistance by ensuring ORD scientists and engineers were accessible to the Agency’s Office and Regional decision makers, including Remedial Project Managers, On-Scene Coordinators, and corrective action staff. Five ORD Technical Support Centers (TSCs) were created to facilitate this technical assistance. Three of the five TSCs are supported by the Sustainable and Healthy Communities Research Program, and are summarized in the poster being presented:• Engineering Technical Support Center (ETSC) in Cincinnati, Ohio• Ground Water Technical Support Center (GWTSC) in Ada, Oklahoma• Site Characterization and Monitoring Technical Support Center (SCMTSC) in Atlanta, GeorgiaOver the past 29 years, the Technical Support Centers have provided numerous influential products to its internal Agency clients and to those at the State level (through the EPA Regions). These products include, but are not limited to the following: Annual TSC reports from the three Centers, a hard-rock mining conference every other year, PRO-UCL software development for site characterization statistics, groundwater modeling using state-of-the-art modeling software, numerical mo

  9. 78 FR 25292 - Announcement of Funding Awards; Office of Native American Programs Training and Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-30

    ... Awards; Office of Native American Programs Training and Technical Assistance; Fiscal Year 2012 AGENCY... (NOFA) for the Office of Native American Programs Training and Technical Assistance (ONAP T&TA). This... nonprofit organizations, as well as for-profit entities to provide Training & Technical Assistance to the...

  10. 75 FR 55786 - Office of Special Education Programs, Office of Special Education and Rehabilitative Services...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-14

    ... DEPARTMENT OF EDUCATION Office of Special Education Programs, Office of Special Education and Rehabilitative Services, Department of Education; Notice of Final Extension of Project Period and Waiver for the... Transition Technical Assistance Center (NSTTAC). Currently, the Office of Special Education Programs (OSEP...

  11. 34 CFR 380.6 - What activities may the Secretary fund under technical assistance supported employment projects?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION SPECIAL PROJECTS AND DEMONSTRATIONS FOR PROVIDING SUPPORTED EMPLOYMENT SERVICES TO INDIVIDUALS... 34 Education 2 2010-07-01 2010-07-01 false What activities may the Secretary fund under technical...

  12. Should Project Managers Buy Technical Data

    DTIC Science & Technology

    2017-04-06

    Should Project Managers Buy Technical Data? Jerry Harper April 6, 2017 PUBLISHED BY The Defense...intellectual property (IP) management and technical data rights (TDR) strategies. According to DoD Instruction 5000.02 (DoD, 2017), project managers (PMs...Defense Authorization Act NDI ................nondevelopmental item PM ................. project manager R&D ...............research and development

  13. EPA'S GROUND WATER TECHNICAL SUPPORT CENTER

    EPA Science Inventory

    The purpose and the services provided by EPA's Ground Water Technical Support Center (GWTSC) will be presented. In 1987 the Office of Solid Waste and Emergency Response, Regional Waste Management Offices, and ORD established the Technical Support Project (TSP)

    The purpos...

  14. Ohio Medical Office Management. Technical Competency Profile (TCP).

    ERIC Educational Resources Information Center

    Ray, Gayl M.; Wilson, Nick; Mangini, Rick

    This document provides a framework for a broad-based secondary and postsecondary curriculum to prepare students for employment in medical office management. The first part of the technical competency profile (TCP) contains the following items: an explanation of the purpose and scope of Ohio's TCPs; college tech prep program standards; an overview…

  15. Contact Us | OSTI, US Dept of Energy Office of Scientific and Technical

    Science.gov Websites

    Information Skip to main content Scientific and Technical Information Program The home of the U.S. Department of Energy's Scientific and Technical Information Program (STIP) Here you will find MAIL TO: U.S. Department of Energy Office of Scientific and Technical Information ATTN: STIP P.O. Box

  16. 48 CFR 301.604 - Training and certification of Contracting Officers' Technical Representatives.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Training and certification of Contracting Officers' Technical Representatives. 301.604 Section 301.604 Federal Acquisition..., Contracting Authority, and Responsibilities 301.604 Training and certification of Contracting Officers...

  17. ITS/CVO technical project management for non-technical managers : participant guide

    DOT National Transportation Integrated Search

    1998-09-01

    In 1996, the FHWA Office of Motor Carriers (OMC) identified the need to develop a Technical Training Program to support the deployment of Intelligent Transportation System (ITS) technologies for Commercial Vehicle Operations (CVO). The workforce -...

  18. Implementation of quality improvement techniques for management and technical processes in the ACRV project

    NASA Technical Reports Server (NTRS)

    Raiman, Laura B.

    1992-01-01

    Total Quality Management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The objective of the activities described in this paper was to implement effective improvement tools and techniques in order to build work processes which support good management and technical decisions and actions which are crucial to the success of the ACRV project. The objectives were met by applications in both the technical and management areas. The management applications involved initiating focused continuous improvement projects with widespread team membership. The technical applications involved applying proven statistical tools and techniques to the technical issues associated with the ACRV Project. Specific activities related to the objective included working with a support contractor team to improve support processes, examining processes involved in international activities, a series of tutorials presented to the New Initiatives Office and support contractors, a briefing to NIO managers, and work with the NIO Q+ Team. On the technical side, work included analyzing data from the large-scale W.A.T.E.R. test, landing mode trade analyses, and targeting probability calculations. The results of these efforts will help to develop a disciplined, ongoing process for producing fundamental decisions and actions that shape and guide the ACRV organization .

  19. Implementation of quality improvement techniques for management and technical processes in the ACRV project

    NASA Astrophysics Data System (ADS)

    Raiman, Laura B.

    1992-12-01

    Total Quality Management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The objective of the activities described in this paper was to implement effective improvement tools and techniques in order to build work processes which support good management and technical decisions and actions which are crucial to the success of the ACRV project. The objectives were met by applications in both the technical and management areas. The management applications involved initiating focused continuous improvement projects with widespread team membership. The technical applications involved applying proven statistical tools and techniques to the technical issues associated with the ACRV Project. Specific activities related to the objective included working with a support contractor team to improve support processes, examining processes involved in international activities, a series of tutorials presented to the New Initiatives Office and support contractors, a briefing to NIO managers, and work with the NIO Q+ Team. On the technical side, work included analyzing data from the large-scale W.A.T.E.R. test, landing mode trade analyses, and targeting probability calculations. The results of these efforts will help to develop a disciplined, ongoing process for producing fundamental decisions and actions that shape and guide the ACRV organization .

  20. An Analysis of Costs and Cenefits Associated with Initial Contracting Technical Education and Training for Unrestricted Marine Officers

    DTIC Science & Technology

    2017-03-01

    COSTS AND BENEFITS ASSOCIATED WITH INITIAL CONTRACTING TECHNICAL EDUCATION AND TRAINING FOR UNRESTRICTED MARINE OFFICERS by Lee A. White...WITH INITIAL CONTRACTING TECHNICAL EDUCATION AND TRAINING FOR UNRESTRICTED MARINE OFFICERS 5. FUNDING NUMBERS 6. AUTHOR(S) Lee A. White 7. PERFORMING...unlimited. AN ANALYSIS OF COSTS AND BENEFITS ASSOCIATED WITH INITIAL CONTRACTING TECHNICAL EDUCATION AND TRAINING FOR UNRESTRICTED MARINE OFFICERS

  1. 78 FR 65695 - 30-Day Notice of Proposed Information Collection: Technical Processing Requirements for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-01

    ... Information Collection: Technical Processing Requirements for Multifamily Project Mortgage Insurance AGENCY: Office of the Chief Information Officer, HUD. ACTION: Correction, notice. SUMMARY: On October 25, 2013 at... Collection Title of Information Collection: Technical Processing Requirements for Multifamily Project...

  2. Flight Projects Office Information Systems Testbed (FIST)

    NASA Technical Reports Server (NTRS)

    Liggett, Patricia

    1991-01-01

    Viewgraphs on the Flight Projects Office Information Systems Testbed (FIST) are presented. The goal is to perform technology evaluation and prototyping of information systems to support SFOC and JPL flight projects in order to reduce risk in the development of operational data systems for such projects.

  3. CCC CAMP WICKIUP – OFFICE BUILDING, CENTER; TECHNICAL SERVICE QUARTERS, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CCC CAMP WICKIUP – OFFICE BUILDING, CENTER; TECHNICAL SERVICE QUARTERS, RIGHT; EDUCATIONAL BUILDING, LEFT. Photocopy of historic photographs (original photograph on file at National Archives, Rocky Mountain Region, Denver, CO). Unknown USBR Photographer, December 9, 1938 - Wickiup Dam, Deschutes River, La Pine, Deschutes County, OR

  4. Community College Technical Mathematics Project. Final Report.

    ERIC Educational Resources Information Center

    Self, Samuel L.

    The purpose of the research project was to develop an applied or technical mathematics curriculum which would meet the needs of vocational-technical students at the community college level. The research project was divided into three distinct phases: Identifying the mathematical concepts requisite for job-entry competencies in each of the…

  5. Administrative Office Technology. FasTrak Specialization Integrated Technical and Academic Competency (ITAC). Revised.

    ERIC Educational Resources Information Center

    Ohio State Dept. of Education, Columbus. Div. of Career-Technical and Adult Education.

    This document presents the Ohio Integrated Technical and Academic Competency (ITAC) profile for administrative office technology, which is a comprehensive listing of 58 occupational skill competencies deemed essential for Ohio graduates of programs in office technology. The document begins with an introduction to the ITAC system, a list of…

  6. Organizational Considerations for Implementing Systems Engineering and Integration in the Ares Projects Office

    NASA Technical Reports Server (NTRS)

    Thomas, LeAnn; Doreswamy, Rajiv N.

    2008-01-01

    Systems Engineering and Integration (SE&I) is a critical discipline in developing new space systems. In 2005, NASA performed an internal study of 24 agency and Department of Defense (DoD) programs to evaluate methods of integrating SE&I practices and determine their effectiveness. The goal of the study was to determine the best SE&I implementation strategy for the Ares Projects Office. The study identified six SE&I organizational structures: 1. Lead systems integrator (LSI) with SE&I responsibility and government technical insight. 2a. Integration contractor with government SE&I responsibility (government insight). 2b. Integration contractor with government SE&I responsibility (government oversight). 3a. Prime contractor with SE&I responsibility (government insight). 3b. Prime contractor with SE&I responsibility (government oversight). 3c. Prime contractor with SE&I responsibility (government/industry partnership). 4a.Prime contractor with government SE&I responsibility (government insight). 4b. Prime contractor with government SE&I responsibility (government oversight). 4d.Prime contractors with total system performance responsibility (TSPR). 5. Prime contractor with government SE&I responsibility and integration products through a Federally Funded Research and Development Center (FFRDC). 6. Government/FFRDC in-house development with SE&I responsibility and function. The organizational structure used most often was number 4, using a prime contractor with government SE&I responsibility and government technical insight. However, data analyses did not establish a positive relationship between program development costs and specific SE&I organizational types, nor did it positively determine the relationship between successful programs or projects and their SE&I structure. The SE&I study reached the following conclusions: (1) Large, long-duration, technically complex programs or projects reach their technical goals, but rarely meet schedule or cost goals. NASA's recent

  7. Minnesota Deaf-Blind Technical Assistance Project. Final Report.

    ERIC Educational Resources Information Center

    Kloos, Eric

    This final report describes activities and accomplishments of the 3-year federally supported Minnesota Deaf-Blind Technical Assistance Project. The project provided training and technical assistance, information sharing, and support services to families of children with deaf-blindness. Activities and accomplishments included: collaboration with…

  8. Engineering Technical Support Center Annual Report Fiscal ...

    EPA Pesticide Factsheets

    The United States Environmental Protection Agency (EPA or Agency) Office of Research and Development (ORD) created the Engineering Technical Support Center (ETSC) in 1987, one of several technical support centers created as part of the Technical Support Project (TSP). ETSC provides engineering expertise to Agency program and regional offices and remediation teams working at contaminated sites across the country. The ETSC is operated within ORD’s Land Remediation and Pollution Control Division (LRPCD) of the National Risk Management Research Laboratory (NRMRL) in Cincinnati, Ohio. The ETSC’s mission is to provide site-specific scientific and engineering technical support to Remedial Project Managers, On-Scene Coordinators, and other remediation personnel at contaminated sites. This allows local, regional, or national authorities to work more quickly, efficiently, and cost effectively, while also increasing the technical experience of the remediation team. Since its inception, the ETSC has supported countless projects across all EPA Regions in almost all states and territories. This report highlights significant projects the ETSC supported in fiscal year 2015 (FY15). These projects addressed an array of environmental scenarios, such as remote mining contamination, expansive landfill waste, cumulative impacts from multiple contamination sources, and persistent threats from abandoned industrial sites. Constructing and testing new and innovative treatment technol

  9. Engineering Technical Support Center Annual Report Fiscal Year 2015

    EPA Science Inventory

    The United States Environmental Protection Agency (EPA or Agency) Office of Research and Development (ORD) created the Engineering Technical Support Center (ETSC) in 1987, one of several technical support centers created as part of the Technical Support Project (TSP). ETSC provid...

  10. 78 FR 64146 - 30-Day Notice of Proposed Information Collection: Technical Processing Requirements for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-25

    ... Information Collection: Technical Processing Requirements for Multifamily Project Mortgage Insurance AGENCY: Office of the Chief Information Officer, HUD. ACTION: Notice. SUMMARY: HUD has submitted the proposed... Information Collection Title of Information Collection: Technical Processing Requirements for Multifamily...

  11. Low Emissions Alternative Power (LEAP) Project Office Business Team of the Aeropropulsion Research Program Office (ARPO) Org. 0140

    NASA Technical Reports Server (NTRS)

    Buttler, Jennifer A.

    2004-01-01

    The program for which I am working at this summer is Propulsion and Power/Low Emissions Alternative Power (P&P/LEAP). It invests in a fundamental TRL 1-6 research and technology portfolio that will enable the future of: Alternative fuels and/or alternative propulsion systems, non-combustion (electric) propulsion systems. P&P/LEAP will identify and capitalize on the highest potential concepts generated both internal and external to the Agency. During my 2004 summer at NASA Glenn Research Center, I worked with my mentor Barbara Mader, in the Project Office with the Business Team completing various tasks for the project and personnel. The LEAP project is a highly matrixed organization. The Project Office is responsible for the goals advocacy and dollar (budget) of the LEAP project. The objectives of the LEAP Project are to discover new energy sources and develop unconventional engines and power systems directed towards greatly reduced emissions, enable new vehicle concepts for public mobility, new science missions and national security. The Propulsion and PowerLow Emissions Alternative Power directly supports the environmental, mobility, national security objectives of the Vehicle Systems Program and the Aeronautics Technology Theme. Technology deliverables include the demonstration through integrated ground tests, a constant volume combustor in an engine system, and UAV/small transport aircraft all electric power system. My mentor serves as a key member of the management team for the Aeropropulsion Research Program Office (ARPO). She has represented the office on numerous occasions, and is a member of a number of center-wide panels/teams, such as the Space management Committee and is chair to the Business Process Consolidation Team. She is responsible for the overall coordination of resources for the Propulsion and Power Project - from advocacy to implementation. The goal for my summer at NASA was to document processes and archive program documents from the past

  12. Using Project Management Systems at the Construction Field Office

    DTIC Science & Technology

    1989-03-01

    instrumentation 13550 transportation control instrumentation 13600 solor energy systems 13700 wind energy systems 13800 building automation systems ...Engineering Research Laboratory AD-A207 077 Using Project Management Systems at the Construction Field Office by E. William East Jeffrey G. Kirby Automated...automated systems available, engineers at the construction fieid office (or resident office) are faced with the over- whelming task of choosing which

  13. TECHNICAL INFORMATION POLICY AND GUIDE OF THE OFFICE OF RESEARCH AND DEVELOPMENT

    EPA Science Inventory

    One of the primary missions of the Office of Research and Development (ORD) is to generate technical information that is key to the protection of environmental quality. This information also influences national environmental policy. In this context, the way in which information i...

  14. [Acoustic conditions in open plan office - Application of technical measures in a typical room].

    PubMed

    Mikulski, Witold

    2018-03-09

    Noise in open plan offices should not exceed acceptable levels for the hearing protection. Its major negative effects on employees are nuisance and impediment in execution of work. Specific technical solutions should be introduced to provide proper acoustic conditions for work performance. Acoustic evaluation of a typical open plan office was presented in the article published in "Medycyna Pracy" 5/2016. None of the rooms meets all the criteria, therefore, in this article one of the rooms was chosen to apply different technical solutions to check the possibility of reaching proper acoustic conditions. Acoustic effectiveness of those solutions was verified by means of digital simulation. The model was checked by comparing the results of measurements and calculations before using simulation. The analyzis revealed that open plan offices supplemented with signals for masking speech signals can meet all the required criteria. It is relatively easy to reach proper reverberation time (i.e., sound absorption). It is more difficult to reach proper values of evaluation parameters determined from A-weighted sound pressure level (SPLA) of speech. The most difficult is to provide proper values of evaluation parameters determined from speech transmission index (STI). Finally, it is necessary (besides acoustic treatment) to use devices for speech masking. The study proved that it is technically possible to reach proper acoustic condition. Main causes of employees complaints in open plan office are inadequate acoustic work conditions. Therefore, it is necessary to apply specific technical solutions - not only sound absorbing suspended ceiling and high acoustic barriers, but also devices for speech masking. Med Pr 2018;69(2):153-165. This work is available in Open Access model and licensed under a CC BY-NC 3.0 PL license.

  15. Transition to Office-based Obstetric and Gynecologic Procedures: Safety, Technical, and Financial Considerations.

    PubMed

    Peacock, Lisa M; Thomassee, May E; Williams, Valerie L; Young, Amy E

    2015-06-01

    Office-based surgery is increasingly desired by patients and providers due to ease of access, overall efficiency, reimbursement, and satisfaction. The adoption of office-based surgery requires careful consideration of safety, efficacy, cost, and feasibility within a providers practice. This article reviews the currently available data regarding patient and provider satisfaction as well as practical considerations of staffing, equipment, and supplies. To aid the practitioner, issues of office-based anesthesia and safety with references to currently available national guidelines and protocols are provided. Included is a brief review of billing, coding, and reimbursement. Technical procedural aspects with information and recommendations are summarized.

  16. Project Manager Performance and the Decision to Backsource the Project Management Office

    ERIC Educational Resources Information Center

    Lively, William R.

    2014-01-01

    This paper reviews a management decision of an Information Technology Outsource (ITO) provider to backshore the management oversight of its Project Management Office (PMO) after only one year of offshore operations. Governance is a term used in project management to refer to management oversight. The review is a quantitative analysis of existing…

  17. 48 CFR 801.602-80 - Legal and technical review-Office of Construction and Facilities Management and National Cemetery...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...

  18. 48 CFR 801.602-80 - Legal and technical review-Office of Construction and Facilities Management and National Cemetery...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...

  19. 48 CFR 801.602-80 - Legal and technical review-Office of Construction and Facilities Management and National Cemetery...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...

  20. 48 CFR 801.602-80 - Legal and technical review-Office of Construction and Facilities Management and National Cemetery...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...

  1. 75 FR 6683 - Notice of Proposed Information Collection: Comment Request; Technical Processing Requirements for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-10

    ... Information Collection: Comment Request; Technical Processing Requirements for Multifamily Project Mortgage... information: Title of Proposal: Technical Processing Requirements for Multifamily Project Mortgage Insurance... information collection requirement described below will be submitted to the Office of Management and Budget...

  2. Department of Energy: Office of Scientific and Technical Information

    NASA Technical Reports Server (NTRS)

    Grissom, Catherine

    1994-01-01

    The international acquisitions functions and activities of the Office of Scientific and Technical Information (OSTI) are described. There are four mechanisms for obtaining foreign information related to energy and nuclear science: The Energy Technology Data Exchange consisting of 14 member countries and 2 associate members; the International Nuclear Information System consisting of 86 countries and 17 international organizations; the Nuclear Energy Agency's 19 member countries provide reports for departmental scientists' use; bilateral agreements with countries such as Germany, the Nordic Consortium, and Australia result in records of foreign research in progress.

  3. EPA OFFICE OF RESEARCH AND DEVELOPMENT GUIDELINES FOR TECHNICAL EVALUATION OF ECOLOGICAL INDICATORS

    EPA Science Inventory

    EPA's Office of Research and Development (ORD) has prepared fifteen technical guidelines to evaluate the suitability of an ecological indicator in a monitoring program. The guidelines were fashioned to provide a consistent framework for indicator review and to provide direction f...

  4. Project T.E.A.M. (Technical Education Advancement Modules). Final Report.

    ERIC Educational Resources Information Center

    Greenville Technical Coll., SC.

    Project TEAM (Technical Education Advancement Modules), a cooperative demonstration program for high technology training, created an introductory technical training program and a consumer education package emphasizing the benefits of technical training. The curriculum and training focus of the project began with an assessment of employee needs in…

  5. Office of Exploration: Exploration studies technical report. Volume 2: Studies approach and results

    NASA Technical Reports Server (NTRS)

    Roberts, Barney B.; Bland, Dan

    1988-01-01

    The NASA Office of Exploration has been tasked with defining and recommending alternatives for an early 1990's national decision on a focused program of human exploration of the solar system. The Mission Analysis and System Engineering (MASE) group, which is managed by the Exploration Studies Office at the Johnson Space Center, is responsible for coordinating the technical studies necessary for accomplishing such a task. This technical report describes the process that has been developed in a case study approach. The four case studies that were developed in FY88 include: (1) human expedition to Phobos; (2) human expeditions to Mars; (3) lunar observatory; and (4) lunar outpost to early Mars evolution. The final outcome of this effort is a set of programmatic and technical conclusions and recommendations for the following year's work. Volume 2 describes the case study process, the technical results of each of the case studies, and opportunities for additional study. Included in the discussion of each case study is a description of the mission key features and profile. Mission definition and manifesting are detailed, followed by a description of the mission architecture and infrastructure. Systems concepts for the required orbital nodes, transportation systems, and planetary surface systems are discussed. Prerequisite implementation plans resulting from the synthesized case studies are described and in-depth assessments are presented.

  6. The Office of Technology Development technical reports. A bibliography

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-09-01

    The US Department of Energy`s Office of Technology Development (OTD) within the Office of Environmental Management was established in 1989 to conduct an aggressive national program of applied research, development, demonstration, testing, and evaluation (RDDT&E) for innovative environmental cleanup solutions that are safer and more time- and cost-effective than those currently available. In many cases, the development of new technology presents the best hope for ensuring a substantive reduction in risk to the environment and improved worker/public safety within realistic financial constraints. Five major remediation and waste management problem areas have been identified to date within the DOE weapons complex;more » Contaminant Plume Containment and Remediation; Mixed Waste Characterization, Treatment, and Disposal; High-Level Waste Tank Remediation; Landfill Stabilization; and Facility Transitioning, Decommissioning, and Final Disposition. New technologies to address these problem areas are demonstrated to the point that they are proven to work and that they can be transferred to the private sector end-users. This bibliography contains information on scientific and technical reports sponsored by the Office of Environmental Management from its inception in 1989 through June 1994. Future issues contain reports from Technology Development activities and will be published biannually.« less

  7. Contact Us | OSTI, US Dept of Energy Office of Scientific and Technical

    Science.gov Websites

    Information skip to main content Sign In Create Account OSTI.GOV title logo U.S. Department of Energy Office of Scientific and Technical Information Search terms: Advanced search options Advanced Tools Public Access Policy Data Services & Dev Tools About FAQs News Sign In Create Account Contact

  8. Project Interface Requirements Process Including Shuttle Lessons Learned

    NASA Technical Reports Server (NTRS)

    Bauch, Garland T.

    2010-01-01

    Most failures occur at interfaces between organizations and hardware. Processing interface requirements at the start of a project life cycle will reduce the likelihood of costly interface changes/failures later. This can be done by adding Interface Control Documents (ICDs) to the Project top level drawing tree, providing technical direction to the Projects for interface requirements, and by funding the interface requirements function directly from the Project Manager's office. The interface requirements function within the Project Systems Engineering and Integration (SE&I) Office would work in-line with the project element design engineers early in the life cycle to enhance communications and negotiate technical issues between the elements. This function would work as the technical arm of the Project Manager to help ensure that the Project cost, schedule, and risk objectives can be met during the Life Cycle. Some ICD Lessons Learned during the Space Shuttle Program (SSP) Life Cycle will include the use of hardware interface photos in the ICD, progressive life cycle design certification by analysis, test, & operations experience, assigning interface design engineers to Element Interface (EI) and Project technical panels, and linking interface design drawings with project build drawings

  9. Independent technical review, handbook

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    Purpose Provide an independent engineering review of the major projects being funded by the Department of Energy, Office of Environmental Restoration and Waste Management. The independent engineering review will address questions of whether the engineering practice is sufficiently developed to a point where a major project can be executed without significant technical problems. The independent review will focus on questions related to: (1) Adequacy of development of the technical base of understanding; (2) Status of development and availability of technology among the various alternatives; (3) Status and availability of the industrial infrastructure to support project design, equipment fabrication, facility construction,more » and process and program/project operation; (4) Adequacy of the design effort to provide a sound foundation to support execution of project; (5) Ability of the organization to fully integrate the system, and direct, manage, and control the execution of a complex major project.« less

  10. Chemical research projects office: An overview and bibliography, 1975-1980

    NASA Technical Reports Server (NTRS)

    Kourtides, D. A.; Heimbuch, A. H.; Parker, J. A.

    1980-01-01

    The activities of the Chemical Research Projects Office at Ames Research Center, Moffett Field, California are reported. The office conducts basic and applied research in the fields of polymer chemistry, computational chemistry, polymer physics, and physical and organic chemistry. It works to identify the chemical research and technology required for solutions to problems of national urgency, synchronous with the aeronautic and space effort. It conducts interdisciplinary research on chemical problems, mainly in areas of macromolecular science and fire research. The office also acts as liaison with the engineering community and assures that relevant technology is made available to other NASA centers, agencies, and industry. Recent accomplishments are listed in this report. Activities of the three research groups, Polymer Research, Aircraft Operating and Safety, and Engineering Testing, are summarized. A complete bibliography which lists all Chemical Research Projects Office publications, contracts, grants, patents, and presentations from 1975 to 1980 is included.

  11. National Unmanned Aircraft Systems Project Office

    USGS Publications Warehouse

    Goplen, Susan E.; Sloan, Jeff L.

    2015-01-01

    The U.S. Geological Survey (USGS) National Unmanned Aircraft Systems (UAS) Project Office leads the implementation of UAS technology in the Department of the Interior (DOI). Our mission is to support the transition of UAS into DOI as a new cost-effective tool for collecting remote-sensing data to monitor environmental conditions, respond to natural hazards, recognize the consequences and benefits of land and climate change and conduct wildlife inventories. The USGS is teaming with all DOI agencies and academia as well as local, State, and Tribal governments with guidance from the Federal Aviation Administration and the DOI Office of Aviation Services (OAS) to lead the safe, efficient, costeffective and leading-edge adoption of UAS technology into the scientific research and operational activities of the DOI.

  12. Supersonics Project: Airport Noise Technical Challenge

    NASA Technical Reports Server (NTRS)

    Bridges, James E.

    2008-01-01

    This presentation gives an overview of the work being done under the Airport Noise Technical Challenge portion of the Supersonics Project in the Fundamental Aeronautics Program. The objective of the Challenge is to provide technology (e.g. low noise nozzle concepts) and engineering tools required for a viable supersonic aircraft. To accomplish this we have activities divided into Prediction, Diagnostics, and Engineering elements. Each of the tasks reviewed here have potential applications to work being done at other flight regimes and other aircraft and are of interest to the Acoustics Technical Working Group.

  13. Technical clarity in inter-agency negotiations: Lessons from four hydropower projects

    USGS Publications Warehouse

    Burkardt, Nina; Lamb, Berton Lee; Taylor, Jonathan G.; Waddle, Terry J.

    1995-01-01

    We investigated the effect of technical clarity on success in multi-party negotiations in the Federal Energy Regulatory Commission (FERC) licensing process. Technical clarity is the shared understanding of dimensions such as the geographic extent of the project, range of flows to be considered, important species and life stages, and variety of water uses considered. The results of four hydropower licensing consultations are reported. Key participants were interviewed to ascertain the level of technical clarity present during the consultations and the degree to which the consultations were successful. Technical clarity appears to be a prerequisite for successful outcomes. Factors that enhance technical clarity include simple project design, new rather than existing projects, precise definition of issues, a sense of urgency to reach agreement, a sense of fairness among participants, and consistency in participation. Negotiators should not neglect the critical pre-negotiation steps of defining technical issues and determining appropriate studies, deciding how to interpret studies, and agreeing on responses to study results.

  14. 75 FR 44968 - Office of the Secretary, Office of the Assistant Secretary for Planning and Evaluation; Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-30

    ... Trustees) establish a panel of technical experts to review the methods used in the HI and SMI annual... care, and alternate projection methodologies. The panel may also examine other methodological issues...

  15. The project management office: transforming healthcare in the context of a hospital redevelopment project.

    PubMed

    Richer, Marie-Claire; Marchionni, Caroline; Lavoie-Tremblay, Melanie; Aubry, Monique

    2013-01-01

    It has been shown that classifying projects into a typology allows improved allocation of resources and promotes project success. However, a typology of healthcare projects has yet to be developed. The projects encountered by the Transition Support Office at the McGill University Health Centre in Montreal, Quebec, where a major redevelopment project is under way, were classified into a typology unique to the healthcare context. Examples of the 3 project types, Process, People, and Practice, are provided to clarify the specific support strategies and context-adapted interventions that were instrumental to their success.

  16. The Effect of Technical Assistance on Involvement and Use: The Case of a Research, Evaluation, and Technical Assistance Project

    ERIC Educational Resources Information Center

    Roseland, Denise; Volkov, Boris B.; Callow-Heusser, Catherine

    2011-01-01

    In contrast to typical National Science Foundation program evaluations, the Utah State Math Science Partnership-Research, Evaluation and Technical Assistance Project (MSP-RETA) provided technical assistance (TA) in two forms: direct TA for up to 10 projects a year, and professional development sessions for a larger number of project staff. Not…

  17. Innovation in health service management: Adoption of project management offices to support major health care transformation.

    PubMed

    Lavoie-Tremblay, Mélanie; Aubry, Monique; Cyr, Guylaine; Richer, Marie-Claire; Fortin-Verreault, Jean-François; Fortin, Claude; Marchionni, Caroline

    2017-11-01

    To explore the characteristics that influence project management offices acceptance and adoption in healthcare sector. The creation of project management offices has been suggested as a promising avenue to promote successful organisational change and facilitate evidence-based practice. However, little is known about the characteristics that promote their initial adoption and acceptance in health care sector. This knowledge is important in the context where many organisations are considering implementing project management offices with nurse managers as leaders. A descriptive multiple case study design was used. The unit of analysis was the project management offices. The study was conducted in three university-affiliated teaching hospitals in 2013-14 (Canada). Individual interviews (n = 34) were conducted with senior managers. Results reveal that project management offices dedicated to project and change management constitute an innovation and an added value that addresses tangible needs in the field. Project management offices are an innovation highly compatible with health care managers and their approach has parallels to the process of clinical problem solving and reasoning well-known to adopters. This knowledge is important in a context where many nurses hold various roles in project management offices, such as Director, project manager, clinical expert and knowledge broker. © 2017 John Wiley & Sons Ltd.

  18. [Earth Science Technology Office's Computational Technologies Project

    NASA Technical Reports Server (NTRS)

    Fischer, James (Technical Monitor); Merkey, Phillip

    2005-01-01

    This grant supported the effort to characterize the problem domain of the Earth Science Technology Office's Computational Technologies Project, to engage the Beowulf Cluster Computing Community as well as the High Performance Computing Research Community so that we can predict the applicability of said technologies to the scientific community represented by the CT project and formulate long term strategies to provide the computational resources necessary to attain the anticipated scientific objectives of the CT project. Specifically, the goal of the evaluation effort is to use the information gathered over the course of the Round-3 investigations to quantify the trends in scientific expectations, the algorithmic requirements and capabilities of high-performance computers to satisfy this anticipated need.

  19. [Factors associated with investment in an office medicine project by general practice residents].

    PubMed

    Munck, Stéphane; Massin, Sophie; Hofliger, Philippe; Darmon, David

    2015-01-01

    To identify thefactors associated with investment in an office medicine project by French general practice (GP) residents. We conducted a national survey using a web-based self-administered questionnaire and analyzed the data collected by multiple logistic regressions. The dependent variable was "an office medicine project" The explanatory variables were both individual (socio-demographic and linked to training trajectories) and contextual (related to the available training programmes and the regional medical demography). The response rate was 48.5%. Out of the 1,695 residents of the study sample, 315 (18.6%) already had a project to setup an office practice during their third cycle ofmedical studies. The main factors associated with this project were (p < 0.05): to receive strong academic support, to live in a rural or semi-rural area, to work as a GP locum, to perform residency training in the same city as the medical training and to perform residency training in a region with a high percentage of GPs 55years and older. This study showed that a project to setup an office practice was influenced by both individual and contextualfactors. Special attention should be paid to the means and content of training to ensure better supportfor residents, which could make office general practice more attractive.

  20. The CHPRC Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fix, N. J.

    The scope of the CH2M Hill Plateau Remediation Company, LLC (CHPRC) Groundwater and Technical Integration Support (Master Project) is for Pacific Northwest National Laboratory staff to provide technical and integration support to CHPRC. This work includes conducting investigations at the 300-FF-5 Operable Unit and other groundwater operable units, and providing strategic integration, technical integration and assessments, remediation decision support, and science and technology. The projects under this Master Project will be defined and included within the Master Project throughout the fiscal year, and will be incorporated into the Master Project Plan. This Quality Assurance Management Plan provides the quality assurancemore » requirements and processes that will be followed by the CHPRC Groundwater and Technical Integration Support (Master Project) and all releases associated with the CHPRC Soil and Groundwater Remediation Project. The plan is designed to be used exclusively by project staff.« less

  1. Implementation of a Project Management Office (PMO)--experiences from year 1.

    PubMed

    Isola, Miriam; Polikaitis, Audrius; Laureto, Rose Ann

    2006-01-01

    Recognized as an early leader in clinical information systems, the University of Illinois Medical Center was challenged to meet the ever-increasing demand for information systems. Interviews with key stakeholders revealed unfavorable attitudes toward the Information Services department. Reasons given were that projects often are not aligned with business strategy, projects are delayed, IS itself is a barrier to progress, and a lack of proactive planning precipitates crises. Under the leadership of a new CIO, IS began developing a Project Management Office, or PMO, to better meet medical center business objectives and to more effectively manage technology projects. Successes during the first year included comprehensive IT strategic planning. Collaborative relationships were established with departmental leaders for planning, prioritizing, budgeting, and executing projects. A formal Web-based process for requesting IS projects was implemented, project management training was provided, and elements of standard project management methodology were implemented. While a framework for effective project management was created, significant effort is still required to firmly root these new processes within the organizational culture. Project management office goals for the second year include implementing a project portfolio management tool, refining the benefits methodology, and continuing the advancement of the project management methodology.

  2. Strengthening Local K-12 Accountability: The Role of County Offices of Education. Technical Appendices

    ERIC Educational Resources Information Center

    Warren, Paul

    2016-01-01

    This document presents the technical appendices that accompany the full report, "Strengthening Local K-12 Accountability: The Role of County Offices of Education." The appendices include: (1) Data Collection Methods; and (2) PPIC Survey of California County Superintendents of Education. [For the full report, see ED570941.

  3. Results of the Boulder Consultation: The Beginnings of a Technical Assistance Program for the Office of Environmental Education/USOE/HEW.

    ERIC Educational Resources Information Center

    Office of Education (DHEW), Washington, DC. Office of Environmental Education.

    In December 1977, the Office of Environmental Education (OEE) brought its fiscal year '77 grant recipients together in Boulder, Colorado, for a technical assistance consultation. The technical assistance responsibilities of OEE are mandated by the Environmental Education Act. Until this consultation, OEE had been giving its technical assistance on…

  4. U.S. EPA OFFICE OF RESEARCH AND DEVELOPMENT GUIDELINES FOR TECHNICAL EVALUATION OF ECOLOGICAL INDICATORS

    EPA Science Inventory

    EPA's Office of Research and Development (ORD) has prepared fifteen technical guidelines to evaluate the suitability of an ecological indicator in a monitoring program. The guidelines were fashioned to provide a consistent framework for indicator review and to provide direction f...

  5. 7 CFR 2500.047 - Project meetings.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 15 2013-01-01 2013-01-01 false Project meetings. 2500.047 Section 2500.047... Post-Award and Closeout § 2500.047 Project meetings. In addition to reviewing and monitoring the status of progress and final technical reports and financial reports, OAO Project Officers may use regular...

  6. 7 CFR 2500.047 - Project meetings.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 15 2012-01-01 2012-01-01 false Project meetings. 2500.047 Section 2500.047... Post-Award and Closeout § 2500.047 Project meetings. In addition to reviewing and monitoring the status of progress and final technical reports and financial reports, OAO Project Officers may use regular...

  7. 76 FR 38383 - Albany Engineering Corporation, Town of Stuyvesant, NY; Notice of Site Visit and Technical Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-30

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Project No. 2696-033] Albany Engineering Corporation, Town of Stuyvesant, NY; Notice of Site Visit and Technical Meeting On July 12, 2011, Office of Energy Projects staff will participate in a site visit and technical meeting for the Stuyvesant...

  8. 18 CFR 375.308 - Delegations to the Director of the Office of Energy Projects.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Director of the Office of Energy Projects. 375.308 Section 375.308 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REVISED GENERAL RULES THE COMMISSION Delegations § 375.308 Delegations to the Director of the Office of Energy Projects. The Commission authorizes...

  9. 18 CFR 375.308 - Delegations to the Director of the Office of Energy Projects.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Director of the Office of Energy Projects. 375.308 Section 375.308 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REVISED GENERAL RULES THE COMMISSION Delegations § 375.308 Delegations to the Director of the Office of Energy Projects. The Commission authorizes...

  10. 18 CFR 375.308 - Delegations to the Director of the Office of Energy Projects.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Director of the Office of Energy Projects. 375.308 Section 375.308 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REVISED GENERAL RULES THE COMMISSION Delegations § 375.308 Delegations to the Director of the Office of Energy Projects. The Commission authorizes...

  11. 18 CFR 375.308 - Delegations to the Director of the Office of Energy Projects.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Director of the Office of Energy Projects. 375.308 Section 375.308 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REVISED GENERAL RULES THE COMMISSION Delegations § 375.308 Delegations to the Director of the Office of Energy Projects. The Commission authorizes...

  12. SREM (Software Requirements Engineering Methodology) Evaluation. Volume 2. Specifications and Technical Data.

    DTIC Science & Technology

    1984-02-01

    and is approved for publication. APPROVED: ’"" " Project Engineer APPROVED:k 1 4 RAYMOND P. URTZ, JR. Acting Technical Director Command and Control ...Technical Director Command and Control Division FOR THE COMMANDER: JOHN A. RITZ Acting Chief, Plans Office If your address has changed or if you wish to be...179 55812203 Denver CO 80201 55812203 I. CONTROLLING OFFICE NAME AND ADDRESS 12. REPORT DATE Rome Air Development Center (COEE) February 1984 Griffiss

  13. Uganda's National Transmission Backbone Infrastructure Project: Technical Challenges and the Way Forward

    NASA Astrophysics Data System (ADS)

    Bulega, T.; Kyeyune, A.; Onek, P.; Sseguya, R.; Mbabazi, D.; Katwiremu, E.

    2011-10-01

    Several publications have identified technical challenges facing Uganda's National Transmission Backbone Infrastructure project. This research addresses the technical limitations of the National Transmission Backbone Infrastructure project, evaluates the goals of the project, and compares the results against the technical capability of the backbone. The findings of the study indicate a bandwidth deficit, which will be addressed by using dense wave division multiplexing repeaters, leasing bandwidth from private companies. Microwave links for redundancy, a Network Operation Center for operation and maintenance, and deployment of wireless interoperability for microwave access as a last-mile solution are also suggested.

  14. NREL Technical Reports Guide the Way to 50% Energy Savings in Hospitals, Office Buildings (Fact Sheet)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    2011-02-01

    Researchers at the National Renewable Energy Laboratory (NREL) have developed two technical reports that provide recommendations to help designers and operators of large office buildings and hospitals achieve at least a 50% energy savings using existing technology.

  15. Government Projects and Teaching the Technical Proposal.

    ERIC Educational Resources Information Center

    Butler, Douglas R.

    1987-01-01

    Describes a technical proposal writing assignment modeled after the conditions in industry. Provides a paradigm of government project proposals and then outlines the stages of the assignment that allow student to rework and revise, thereby discouraging students from writing formulaic and superficial proposals. (SRT)

  16. 4. DETAIL OF EAST SIDE, SHOWING TRACK SUPERVISOR'S OFFICE PROJECTION. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. DETAIL OF EAST SIDE, SHOWING TRACK SUPERVISOR'S OFFICE PROJECTION. VIEW TO WEST. - Commercial & Industrial Buildings, Illinois Central Railroad Passenger Depot, Iowa & Jones Streets, Dubuque, Dubuque County, IA

  17. 78 FR 17935 - Proposed Collection; Comment Request: NIH Office of Intramural Training & Education Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-25

    ... Enrichment Program 100.0 1.0 1.0 100.00 (CCSEP) Technical Training Program (PBT) 115.0 1.0 1.0 115.00... Request: NIH Office of Intramural Training & Education Application SUMMARY: In compliance with the... comment on proposed data collection projects, the Office of Intramural Training & Education/OIR/OD, the...

  18. Support to 2nd Generation RLV Propulsion Project Office

    NASA Technical Reports Server (NTRS)

    Lee, Thomas J.

    2002-01-01

    In this final report regarding support to the second generation RLV (Reusable Launch Vehicle) propulsion project office, a list of tasks accomplished is presented. During this period, Lee & Associates, LLC participated in numerous Systems Requirements Reviews (SRR) related to the Cobra development program.

  19. Renewable Energy Project Development Assistance (Fact Sheet)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This fact sheet provides information on the Tribes selected to receive assistance from the U.S. Department of Energy Office of Indian Energy 2013 Strategic Technical Assistance Response Team (START) Program, which provides technical expertise to support the development of next-generation energy projects on tribal lands.

  20. Eleven Tribes Jump START Clean Energy Projects, Summer 2012 (Newsletter)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This newsletter describes key activities of the DOE Office of Indian Energy Policy and Programs for Summer 2012. The U.S. Department of Energy Office of Indian Energy Policy and Programs (DOE-IE) has selected 11 Tribes - five in Alaska and six in the contiguous United States - to receive on-the-ground technical support for community-based energy efficiency and renewable energy projects as part of DOE-IE's Strategic Technical Assistance Response Team (START) Program. START finalists were selected based on the clarity of their requests for technical assistance and the ability of START to successfully work with their projects or community. Technical expertsmore » from DOE and its National Renewable Energy Laboratory (NREL) will work directly with community-based project teams to analyze local energy issues and assist the Tribes in moving their projects forward. In Alaska, the effort will be bolstered by DOE-IE's partnership with the Denali Commission, which will provide additional assistance and expertise, as well as funding to fuel the Alaska START initiative.« less

  1. Project Plan: The MEDARP Documentation Unit to the School Improvement and Local School Development Projects.

    ERIC Educational Resources Information Center

    New York City Board of Education, Brooklyn, NY. Office of Educational Evaluation.

    The Metropolitan Educational Development and Research Project (MEDARP) Documentation Unit, located in the Office of Educational Evaluation (OEE) at the New York City Board of Education, is funded by the Ford Foundation to document, evaluate and provide technical assistance to the School Improvement and Local School Development Projects; these are…

  2. Conditions of Employment of Technical/Vocational Teachers.

    ERIC Educational Resources Information Center

    Abrillo, Harry

    A study examined the job requirements and working conditions of vocational and technical education teachers (VTETs) in India, Indonesia, Malaysia, Singapore, and Thailand. Data were gathered (1) from published materials and interviews with officers and staff of concerned agencies and (2) from a project-developed questionnaire that was administered…

  3. Project DIVIDE Instrument Development. Technical Report # 0810

    ERIC Educational Resources Information Center

    Ketterlin-Geller, Leanne; Jung, Eunju; Geller, Josh; Yovanoff, Paul

    2008-01-01

    In this technical report, we describe the development of cognitive diagnostic test items that form the basis of the diagnostic system for Project DIVIDE (Dynamic Instruction Via Individually Designed Environments). The construct underlying the diagnostic test is division of fractions. We include a description of the process we used to identify the…

  4. ESDIS Standards Office (ESO): Requirements, Standards and Practices

    NASA Technical Reports Server (NTRS)

    Mitchell, Andrew E.; Mcinerney, Mark Allen; Enloe, Yonsok K.; Conover, Helen T.; Doyle, Allan

    2016-01-01

    The ESDIS Standards Office assists the ESDIS Project in formulating standards policy for NASA Earth Science Data Systems (ESDS), coordinates standards activities within ESDIS, and provides technical expertise and assistance with standards related tasks within the NASA Earth Science Data System Working Groups (ESDSWG). This poster summarizes information found on the earthdata.nasa.gov site that describes the ESO.

  5. Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fix, N. J.

    The scope of the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) is to provide technical and integration support to Fluor Hanford, Inc., including operable unit investigations at 300-FF-5 and other groundwater operable units, strategic integration, technical integration and assessments, remediation decision support, and science and technology. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project).

  6. Project T.E.A.M. (Technical Education Advancement Modules). Introduction to Industrial Physics.

    ERIC Educational Resources Information Center

    Whisenhunt, James E.

    This instructional guide, one of a series developed by the Technical Education Advancement Modules (TEAM) project, is a 20-hour introduction to industrial physics that explains and demonstrates to industrial maintenance mechanics the direct relationship of physics to machinery. Project TEAM is intended to upgrade basic technical competencies of…

  7. Illinois Clean Coal Institute 2005 annual report. Final technical report for the period September 1st, 2004, through August 31, 2005 on projects funded by the Illinois Department of Commerce and Economic Opportunity

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    2005-11-08

    This final technical report contains the abstracts and executive summaries of projects funded through the Illinois Clean Coal Institute solicitation entitled 'Request for proposals No. 04-1(ICCI/RFP04-1)'. Support of these projects is by the Office of Coal Development and Department of Commerce and Economic Opportunity. The projects fall into the following categories: advanced coal mining technologies; coal preparation and coal production business practice; management of coal combustion byproducts; commercialization and technology transfer. Final project extensions are also recorded.

  8. The pioneer projects: Economical exploration of the solar system

    NASA Technical Reports Server (NTRS)

    Spahr, J. R.; Hall, C. F.

    1975-01-01

    The interplanetary Pioneer missions are reviewed in terms of management implications and cost control. The responsibilities, organizational structure, and management practices of the Pioneer Projects are presented. The lines of authority and areas of responsibility of the principal organizational elements supporting the Pioneer missions are identified, and the methods employed for maintaining effective and timely interactions among these elements are indicated. The technical and administrative functions of the various organizational elements of the Pioneer Project Office at Ames Research Center are described in terms of their management responsibilities and interactions with other elements of the Project Office and with external organizations having Pioneer Project responsibilities. The management and control of activities prior to and during the hardware procurement phase are described to indicate the basis for obtaining visibility of the technical progress, utilization of resources, and cost performance of the contractors and other institutions supporting the Pioneer projects.

  9. 76 FR 50202 - National Technical Assistance and Dissemination Center for Children Who Are Deaf-Blind; Final...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-12

    ... DEPARTMENT OF EDUCATION [CFDA No. 84.326T] National Technical Assistance and Dissemination Center for Children Who Are Deaf-Blind; Final Extension of Project Period and Waiver AGENCY: Office of Special Education Programs, Office of Special Education and Rehabilitative Services, Department of...

  10. Selecting Exemplary Compensatory Education Projects for Dissemination Via Project Information Packages. Report No. UR-242.

    ERIC Educational Resources Information Center

    Foat, Classie M.

    This report is the third technical report submitted to the U. S. Office of Education in connection with a study the overall purpose of which was to choose up to eight successful education programs serving underachieving, poor children and to design "Project Information Packages" for each of them. These Project Information Packages were to serve as…

  11. Iowa Hill Pumped Storage Project Investigations - Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hanson, David

    2016-07-01

    This Final Technical Report is a summary of the activities and outcome of the Department of Energy (DOE) Assistance Agreement DE-EE0005414 with the Sacramento Municipal Utility District (SMUD). The Assistance Agreement was created in 2012 to support investigations into the Iowa Hill Pumped-storage Project (Project), a new development that would add an additional 400 MW of capacity to SMUD’s existing 688MW Upper American River Hydroelectric Project (UARP) in the Sierra Nevada mountains east of Sacramento, California.

  12. Joint Technical Architecture for Robotic Systems (JTARS)-Final Report

    NASA Technical Reports Server (NTRS)

    Bradley, Arthur T.; Holloway, Sidney E., III

    2006-01-01

    This document represents the final report for the Joint Technical Architecture for Robotic Systems (JTARS) project, funded by the Office of Exploration as part of the Intramural Call for Proposals of 2005. The project was prematurely terminated, without review, as part of an agency-wide realignment towards the development of a Crew Exploration Vehicle (CEV) and meeting the near-term goals of lunar exploration.

  13. Technical Assistance for Single Parent Homemaker Projects in Kentucky. Annual Report.

    ERIC Educational Resources Information Center

    Louisville Univ., KY. School of Education.

    During fiscal year 1990, the single parent/displaced homemaker project was monitored at the University of Louisville (Kentucky), and assistance was provided to the project directors. The method of inquiry and the results are discussed in this report. Communication with project directors was increased by visits from a technical assistant,…

  14. Technical Assistance Program: Off to a Running Start (Newsletter)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This newsletter describes key activities of the DOE Office of Indian Energy Policy and Programs for Winter 2012. Between December 2, 2011, and January 15, 2012, 46 American Indian and Alaska Native Tribes submitted applications to receive technical assistance through the program, which provides Tribes with on-the-ground technical support from DOE and National Renewable Energy Laboratory (NREL) staff to help move tribal energy efficiency and renewable energy projects forward. The applications are being considered through the Strategic Technical Assistance Response Team (START) selection process, which incorporates expert reviews and outreach to Tribes who present a need for assistance with theirmore » community-based energy efficiency and renewable energy projects. The final successful applicants will be selected based on the clarity of their requests for technical assistance and the ability of START to successfully work with each unique project or community. At least three selected Tribes in Alaska will receive technical assistance between March and May 2012, and up to five selected Tribes in the contiguous United States will receive technical assistance between March and August 2012. During the months of START Program activity, DOE and NREL experts will work in the two locations. In Alaska, START experts will work directly with community-based project teams to analyze local energy issues and provide assistance with energy projects and cost savings initiatives. This effort will be bolstered by DOE-IE's partnership with the Denali Commission, which will provide further assistance and expertise. In the lower 48 states, NREL experts will work with the selected renewable energy START projects to evaluate financial and technical feasibility and provide early development technical assistance to better position the projects for financing and construction. This on-the-ground technical assistance is part of a broader DOE-IE effort to make reliable, accurate technical

  15. 2013 Geothermal Technologies Office Peer Review Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Geothermal Technologies Office

    Geothermal Technologies Office conducted its annual program peer review in April of 2013. The review provided an independent, expert evaluation of the technical progress and merit of GTO-funded projects. Further, the review was a forum for feedback and recommendations on future GTO strategic planning. During the course of the peer review, DOE-funded projects were evaluated for 1) their contribution to the mission and goals of the GTO and 2) their progress against stated project objectives. Principal Investigators (PIs) came together in sessions organized by topic “tracks” to disseminate information, progress, and results to a panel of independent experts as wellmore » as attendees.« less

  16. 78 FR 70586 - Technical Support Document: Technical Update of the Social Cost of Carbon for Regulatory Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-26

    ... OFFICE OF MANAGEMENT AND BUDGET Technical Support Document: Technical Update of the Social Cost of... Budget, Executive Office of the President. ACTION: Notice of availability and request for comments. SUMMARY: The Office of Management and Budget (OMB) requests comments on the Technical Support Document...

  17. Office of Maternal and Child Health Active Projects FY 1989. An Annotated Listing.

    ERIC Educational Resources Information Center

    National Center for Education in Maternal and Child Health, Washington, DC.

    An annotated listing is presented of projects offering maternal and child health care services. These projects, referred to as special projects of regional and national significance (SPRANS), are supported by the Office of Maternal and Child Health of the Department of Health and Human Services. The first section provides information on services…

  18. 34 CFR 272.10 - What types of projects may be funded?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., counselors, parents, community members, and other elementary or secondary school personnel to deal... 272.10 Education Regulations of the Offices of the Department of Education OFFICE OF ELEMENTARY AND... Secretary may award funds to DACs for projects offering technical assistance (including training) to school...

  19. 34 CFR 272.10 - What types of projects may be funded?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., counselors, parents, community members, and other elementary or secondary school personnel to deal... 272.10 Education Regulations of the Offices of the Department of Education OFFICE OF ELEMENTARY AND... Secretary may award funds to DACs for projects offering technical assistance (including training) to school...

  20. 34 CFR 271.10 - What types of projects may be funded?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... members, and other elementary or secondary school personnel to deal effectively with special educational... 271.10 Education Regulations of the Offices of the Department of Education OFFICE OF ELEMENTARY AND... Secretary awards grants to SEAs for projects offering technical assistance (including training) to school...

  1. 34 CFR 271.10 - What types of projects may be funded?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... members, and other elementary or secondary school personnel to deal effectively with special educational... 271.10 Education Regulations of the Offices of the Department of Education OFFICE OF ELEMENTARY AND... Secretary awards grants to SEAs for projects offering technical assistance (including training) to school...

  2. Clean Cities Technical Assistance Project (Tiger Teams)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    This two-page fact sheet describes Clean Cities' technical assistance (Tiger Teams) capabilities and projects, both completed and ongoing. Tiger Teams are a critical element of the Clean Cities program, providing on-the-ground consultation to help inform program strategies. The knowledge Tiger Team experts gain from these experiences often helps inform other alternative fuels activities, such as needed research, codes and standards revisions, and new training resources.

  3. 34 CFR 380.1 - What is the program of special projects and demonstrations for providing supported employment...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false What is the program of special projects and... technical assistance projects? 380.1 Section 380.1 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION...

  4. Achieving Hydrogen Storage Goals through High-Strength Fiber Glass - Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Li, Hong; Johnson, Kenneth I.; Newhouse, Norman L.

    Led by PPG and partnered with Hexagon Lincoln and Pacific Northwest National Laboratory (PNNL), the team recently carried out a project “Achieving Hydrogen Storage Goals through High-Strength Fiber Glass”. The project was funded by DOE’s Fuel Cell Technologies office within the Office of Energy Efficiency and Renewable Energy, starting on September 1, 2014 as a two-year project to assess technical and commercial feasibilities of manufacturing low-cost, high-strength glass fibers to replace T700 carbon fibers with a goal of reducing the composite total cost by 50% of the existing, commercial 700 bar hydrogen storage tanks used in personal vehicles.

  5. The Computer Science Technical Report (CS-TR) Project: A Pioneering Digital Library Project Viewed from a Library Perspective.

    ERIC Educational Resources Information Center

    Anderson, Greg; And Others

    1996-01-01

    Describes the Computer Science Technical Report Project, one of the earliest investigations into the system engineering of digital libraries which pioneered multiinstitutional collaborative research into technical, social, and legal issues related to the development and implementation of a large, heterogeneous, distributed digital library. (LRW)

  6. Proceedings of the Office of Special Education Programs' Annual Technical Assistance and Dissemination Meeting (6th, Washington, DC, January 16-18, 1996).

    ERIC Educational Resources Information Center

    Special Education Programs (ED/OSERS), Washington, DC.

    This document presents the proceedings for the Office of Special Education Programs' 6th Annual Technical Assistance and Dissemination Meeting held on January 16-18, 1996, in Washington, DC. Conference discussions centered around changing expectations for local and state education agencies and technical assistance and dissemination (TA&D)…

  7. Johnson Space Center Health and Medical Technical Authority

    NASA Technical Reports Server (NTRS)

    Fogarty, Jennifer A.

    2010-01-01

    1.HMTA responsibilities: a) Assure program/project compliance with Agency health and medical requirements at identified key decision points. b) Certify that programs/projects comply with Agency health and medical requirements prior to spaceflight missions. c) Assure technical excellence. 2. Designation of applicable NASA Centers for HMTA implementation and Chief Medical Officer (CMO) appointment. 3. Center CMO responsible for HMTA implementation for programs and projects at the center. JSC HMTA captured in "JSC HMTA Implementation Plan". 4. Establishes specifics of dissenting opinion process consistent with NASA procedural requirements.

  8. 17 CFR 200.11 - Headquarters Office-Regional Office relationships.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 17 Commodity and Securities Exchanges 2 2010-04-01 2010-04-01 false Headquarters Office-Regional... General Organization § 200.11 Headquarters Office—Regional Office relationships. (a)(1) Division and... responsibility to the Commission for the overall development, policy and technical guidance, and policy direction...

  9. The Challenges of Integrating NASA's Human, Budget, and Data Capital within the Constellation Program's Exploration Launch Projects Office

    NASA Technical Reports Server (NTRS)

    Kidd, Luanne; Morris, Kenneth B.; Self, Tim

    2006-01-01

    The U.S. Vision for Space Exploration directs NASA to retire the Space Shuttle in 2010 and replace it with safe, reliable, and cost-effective space transportation systems for crew and cargo travel to the Moon, Mars, and beyond. Such emerging space transportation initiatives face massive organizational challenges, including building and nurturing an experienced, dedicated team with the right skills for the required tasks; allocating and tracking the fiscal capital invested in achieving technical progress against an integrated master schedule; and turning generated data into usehl knowledge that equips the team to design and develop superior products for customers and stakeholders. This paper discusses how NASA's Exploration Launch Projects Office, which is responsible for delivering these new launch vehicles, integrates these resources to create an engineering business environment that promotes mission success.

  10. Chemical Research Projects Office: Functions, accomplishments, and programs

    NASA Technical Reports Server (NTRS)

    Kourtides, D. A.; Parker, J. A.

    1972-01-01

    The purpose, technical accomplishments, and related activities of the Chemical Research Project Group are outlined. Data cover efforts made to: (1) identify chemical research and technology required for solutions to problems of national urgency, synchronous with aeronautics and space effort; (2) conduct basic and applied interdisciplinary research on chemical problems in the areas of macromolecular science and fire research, and (3) provide productive liason with the engineering community and effective transfer of technology to other agencies and industry.

  11. Merging Foreign and Domestic Information Policy Goals: The U.S. Government's Office of Technical Services (1946-1950).

    ERIC Educational Resources Information Center

    Stewart, Robert K.

    This paper examines the institutional history of the United States government's efforts from 1946 to 1950 to gather, rationalize, and communicate to private industry, in the creation of the Office of Technical Services (OTS), the wealth of information that had been generated by scientists during the Second World War. Noting that U.S. information…

  12. Design Study for Project on Standard Operating Procedures for Technical Library Services.

    ERIC Educational Resources Information Center

    Libbey, Miles A.; And Others

    The overall objective of the Technical Information Support Activities (TISA) Project is the production of a "Post Commander's Handbook." The handbook will be instrumental in achieving greater utilization of available technical information resources to assist army scientists and engineers engaged in the support of army combat and other…

  13. Evaluation of Title I ESEA Projects, 1977-1978: Technical Reports. Report Number 7877.

    ERIC Educational Resources Information Center

    Philadelphia School District, PA. Office of Research and Evaluation.

    Technical reports of projects funded under the Elementary and Secondary Education Act Title I and summer components of the projects in the Philadelphia, Pennsylvania school system are presented. Following a summary statement, each project is described separately and contains information on the project's rationale, expected outcomes, mode of…

  14. Training and Education of Financial Management Company Grade Officers

    DTIC Science & Technology

    2010-11-22

    NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) COL Patricia O’Keefe Department of Command, Leadership , and...GRADE OFFICERS by Colonel Randy Stevens United States Army Colonel Patricia O‟ Keefe Project Adviser This SRP...of the mission have the proper technical and leadership skill requisites. Coupled with this is the expectation that leaders must be able to deal

  15. Technical Support Project for Cleaning Up Contaminated Sites - Expertise Directory

    EPA Pesticide Factsheets

    This directory is searchable and provides a snapshot of the various types of expertise possessed by the current members of the three Technical Support Project forums. It is based on input provided by the members themselves.

  16. Baseline assessment of the Strategic Petroleum Reserve Project Management Office

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Oak Ridge Operations Office (ORO) was assigned overall responsibility for implementation of the Strategic Petroleum Reserve Project (SPR) by the Secretary of Energy on June 15, 1983. One of the actions immediately initiated by the Manager of ORO was the establishment of a Task Force under a charter which included directions to conduct a review of the Strategic Petroleum Reserve Project Management Office (SPRPMO) in New Orleans, Louisiana, and to compile a report which would establish a baseline of the PMO status at the time of this major management transition. The purpose of this report is to document thosemore » findings and recommendations for use by the Manager of ORO. The Task Force was also chartered to conduct a full and complete review of all allegations of mismanagement and misconduct since inception of the program in 1977. The review of each allegation of misconduct and mismanagement will be documented in a second report which will be issued at a later date. By necessity, this report covers a broad range of project activities; therefore, within the allotted schedule, it was impossible to conduct an in-depth review and analysis of all of these areas. It is believed, however, that the materials contained within this report are representative of many of the conditions which prevail at the SPRPMO and should serve as a useful basis for management decisions.« less

  17. 46 CFR 11.335 - Requirements to qualify for an STCW endorsement as an electro-technical officer on vessels...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... electro-technical officer on vessels powered by main propulsion machinery of 750 kW/1,000 HP or more... propulsion machinery of 750 kW/1,000 HP or more (operational level). (a) To qualify for an STCW endorsement... electronics. (iii) Integrated navigation equipment. (iv) Ship propulsion and auxiliary machinery. (v...

  18. Capital projects: Egypt case study. Technical report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lieberson, J.; Stallard, J.

    1994-03-01

    This report assesses the US Agency for International Development`s (A.I.D.`s) capital assistance program in Egypt in terms of both its commercial benefits for the United States and its developmental benefits for Egypt. In regard to the first aspect, the study found that few A.I.D.-funded projects or studies generated either participation by other donors or follow-on sales for U.S. companies. The report places much of the blame for this on U.S. firms` failure to take advantage of a clear opportunity to develop the Egyptian commercial market. Findings regarding the developmental benefits of the projects are mixed. (1) The projects helped supportmore » strong private sector growth in Egypt through the 1980`s. Nonetheless, their economic and financial rates of return were generally disappointing. (2) The projects were built to a high technical standard, but their sustainability is in doubt. (3) The pursuit of commercial advantage for U.S. firms did not distort the developmental goals of the projects. Overall, the report attributes the disappointing economic results of A.I.D.`s capital assistance program to a poor policy environment, which the reforms pursued in connection with the program did little to change.« less

  19. 48 CFR 1553.209-71 - EPA Form 1900-27, Project Officer's Evaluation of Contractor Performance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Officer's Evaluation of Contractor Performance. 1553.209-71 Section 1553.209-71 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY CLAUSES AND FORMS FORMS Prescription of Forms 1553.209-71 EPA Form 1900-27, Project Officer's Evaluation of Contractor Performance. As prescribed in 1509.170-4...

  20. Utah's Best Project: Behavioral and Educational Strategies for Teachers. Technical Assistance Manuals, Edited Versions.

    ERIC Educational Resources Information Center

    Reavis, H. Kenton, Ed.; And Others

    The 10 Technical Assistance Manuals compiled in this document were produced under cooperative agreements between the Utah State Office of Education and several school districts. Each module, an entity unto itself, is designed to assist classroom teachers with developing behavioral and educational strategies, concentrating on the objectives,…

  1. Building Bridges: Using the Office Consultation Project to Connect Students to Theory and Practice

    ERIC Educational Resources Information Center

    Wawrzynski, Korine Steinke; Jessup-Anger, Jody E.

    2014-01-01

    The Office Consultation Project is an innovative capstone project that partners graduate students in student affairs preparation programs with academic and student affairs practitioners. It provides an opportunity for students to apply research and scholarship to practical settings, while giving practitioners new insight into their units,…

  2. Region 9 Tribal Grant Program - Project Officer and Tribal Contact Information Map Service

    EPA Pesticide Factsheets

    This compilation of geospatial data is for the purpose of managing and communicating information about current EPA project officers, tribal contacts, and tribal grants, both internally and with external stakeholders.

  3. An Effective Health and Medical Technical Authority

    NASA Technical Reports Server (NTRS)

    Fogarty, Jennifer A.

    2009-01-01

    The NASA Governance model directed the formation of three Technical Authorities, Engineering; Safety and Mission Assurance; and Health and Medical, to ensure that risks are identified and adjudicated efficiently and transparently in concert with the spaceflight programs and projects. The Health and Medical Technical Authority (HMTA) has been implemented at the Johnson Space Center (JSC) and consists of the Chief Medical Office (CMO), the Deputy CMO, and HMTA Delegates. The JSC HMTA achieves the goals of risk identification and adjudication through the discharge of the appropriate technical expertise to human space flight programs and projects and the escalation of issues within program and technical authority boards. The JSC HMTA relies on subject matter experts (SMEs) in the Space Life Sciences Directorate at JSC as well as experts from other Centers to work crew health and performance issues at the technical level, develop requirements, oversee implementation and validation of requirements, and identify risks and non-compliances. Once a risk or potential noncompliance has been identified and reported to the programs or projects, the JSC HMTA begins to track it and closely monitor the program's or project's response. As a risk is developed or a non-compliance negotiated, positions from various levels of decision makers are sought at the program and project control boards. The HMTA may support a program or project position if it is satisfied with the decision making and vetting processes (ex. the subject matter expert voiced his/her concerns and all dissenting opinions were documented) and finds that the position both acknowledges the risk and cost of the mitigation and resolves the issue without changing NASA risk posture. The HMTA may disagree with a program or project position if the NASA risk posture has been elevated or obfuscated. If the HMTA does disagree with the program or project position, it will appeal to successively higher levels of authority so that

  4. Office of Child Care

    MedlinePlus

    ... Office on Trafficking in Persons (OTIP) Public Assistance Reporting Information System (PARIS) By Region Office of Regional ... CCDF Allocations Technical Assistance Policy & Program Resources CCDF Reporting OCC Guide to CCDF Resources Program Instructions Information ...

  5. OPERATION DOMINIC. FISH BOWL SERIES. Project Officer’s Report. Project 8A.3. Close-In Thermal and X-Ray Vulnerability Measurements--Shots Blue Gill and King Fish

    DTIC Science & Technology

    1985-09-01

    QDC hLt umi ^ POR.2037 (WT-2037)(EX) VOLUME 1 EXTRACTED VERSION OPERATION DOMINIC, FISH BOWL SERIES Project Officer’s Report—Project 8A.3...Close-In Thermal and X-ray Vulnerability Measurements—Shots Blue Gill and King Fish F. D. Adams, Project Officer Flight Dynamics Laboratory Wright...version of POR-2037 (WT-2037), Volume 1, OPERATION DOMINIC; Fish Bowl Series, Project 8A. 3. Approved for public release; distribution is unlimited

  6. Project T.E.A.M. (Technical Education Advancement Modules). Fundementals of Workplace Integration.

    ERIC Educational Resources Information Center

    Kraeling, Vicki

    This module is one of a series of instructional guides developed by Project TEAM (Technical Education Advancement Modules), a cooperative demonstration program for high technology training for unemployed, underemployed, and existing industrial employees whose basic technical skills are in need of upgrading. The module is a 27-hour overview course…

  7. 48 CFR 825.902-70 - Technical assistance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Technical assistance. 825... SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Customs and Duties 825.902-70 Technical assistance. Should the... officer should contact the nearest U.S. Customs and Boarder Protection office for technical assistance...

  8. National Evaluation of the State Deaf-Blind Projects. NCEE 2018-4006

    ERIC Educational Resources Information Center

    Daley, Tamara C.; Edwards, Jessica; Fiore, Thomas A.; Johnson, Laura

    2018-01-01

    This report describes the work done by the 48 State Deaf-Blind Projects awarded grants by the Department of Education's Office of Special Education Programs (OSEP) in late 2013. The report documents the technical assistance and dissemination activities carried out by the Projects and their collaborative activities, describes the needs for…

  9. Project Management Series Case Study: The Office of Registration and Records

    ERIC Educational Resources Information Center

    Burgher, Karl E.; Snyder, Michael

    2012-01-01

    This is the third in a series of eight articles on project management (PM) in the academy. In this article, the authors describe the step-by-step implementation of a structural change to Indiana State University's (ISU's) Office of Registration and Records (ORR). The process described may vary as it is implemented elsewhere, but the authors…

  10. Metric Education; A Position Paper for Vocational, Technical and Adult Education.

    ERIC Educational Resources Information Center

    Cooper, Gloria S.; And Others

    Part of an Office of Education three-year project on metric education, the position paper is intended to alert and prepare teachers, curriculum developers, and administrators in vocational, technical, and adult education to the change over to the metric system. The five chapters cover issues in metric education, what the metric system is all…

  11. Accelerating Project and Process Improvement using Advanced Software Simulation Technology: From the Office to the Enterprise

    DTIC Science & Technology

    2010-04-29

    Technology: From the Office Larry Smith Software Technology Support Center to the Enterprise 517 SMXS/MXDEA 6022 Fir Avenue Hill AFB, UT 84056 801...2010 to 00-00-2010 4. TITLE AND SUBTITLE Accelerating Project and Process Improvement using Advanced Software Simulation Technology: From the Office to

  12. 78 FR 52963 - 60-Day Notice of Proposed Information Collection: Technical Processing Requirements for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-27

    ... Information Collection: Technical Processing Requirements for Multifamily Project Mortgage Insurance AGENCY...: HUD is seeking approval from the Office of Management and Budget (OMB) for the information collection... interested parties on the proposed collection of information. The purpose of this notice is to allow for 60...

  13. Admiralty Inlet Pilot Tidal Project Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Collar, Craig

    This document represents the final report for the Admiralty Inlet Pilot Tidal Project, located in Puget Sound, Washington, United States. The Project purpose was to license, permit, and install a grid-connected deep-water tidal turbine array (two turbines) to be used as a platform to gather operational and environmental data on tidal energy generation. The data could then be used to better inform the viability of commercial tidal energy generation from technical, economic, social, and environmental standpoints. This data would serve as a critical step towards the responsible advancement of commercial scale tidal energy in the United States and around themore » world. In late 2014, Project activities were discontinued due to escalating costs, and the DOE award was terminated in early 2015. Permitting, licensing, and engineering design activities were completed under this award. Final design, deployment, operation, and monitoring were not completed. This report discusses the results and accomplishments achieved under the subject award.« less

  14. Technical Assistance in Evaluating Career Education Projects. Final Report. Volume I: Summary Volume.

    ERIC Educational Resources Information Center

    Stenner, A. Jackson; And Others

    This document contains the first of five volumes reporting the activities and results of a career education evaluation project conducted to accomplish the following two objectives: (1) to improve the quality of evaluations by career education projects funded by the United States Office of Career Education (OCE) through the provision of technical…

  15. Office of the Chief Financial Officer Annual Report 2009

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fernandez, Jeffrey

    2009-12-15

    Presented is the 2009 Chief Financial Officer's Annual Report. The data included in this report has been compiled from the Budget Office, the Controller, Procurement and Property Management and the Sponsored Projects Office.

  16. Sustainable Energy in Remote Indonesian Grids. Accelerating Project Development

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hirsch, Brian; Burman, Kari; Davidson, Carolyn

    2015-06-30

    Sustainable Energy for Remote Indonesian Grids (SERIG) is a U.S. Department of Energy (DOE) funded initiative to support Indonesia’s efforts to develop clean energy and increase access to electricity in remote locations throughout the country. With DOE support, the SERIG implementation team consists of the National Renewable Energy Laboratory (NREL) and Winrock International’s Jakarta, Indonesia office. Through technical assistance that includes techno-economic feasibility evaluation for selected projects, government-to-government coordination, infrastructure assessment, stakeholder outreach, and policy analysis, SERIG seeks to provide opportunities for individual project development and a collective framework for national replication office.

  17. Nigrothalamic projections in the monkey demonstrated by autoradiographic technics.

    PubMed

    Carpenter, M B; Nakano, K; Kim, R

    1976-02-15

    In spite of repeated demonstrations by degeneration technics, nigrothalamic fibers have been regarded with some skepticism. Attempts were made to trace nigral efferent projections in the monkey by autoradiographic technics. Tritiated amino acids (L-leucine, L-lysine and L-proline), injected into portions of the substantia nigra (SN), labeled cells in four regions, designated as, (1) rostrolateral, (2) caudolateral, (3) rostromedial and (4) central. Rostrolateral nigral neurons transported radioactive label preferentially and abundantly to thalamic nuclei; localized isotope was found in parts of three thalamic nuclei, the medial part of the ventral lateral nucleus (VLm), the magnocellular part of the ventral anterior nucleus (VAmc), and the paralaminar part of the dorsomedial nucleus (DMpl)9 Lateral neurons in the caudal half of the SN transmitted radioactive label to the same thalamic nuclei as rostrolateral nigral neuron. Isotope transported to portions of the striatum was modest and localized. Radioactive label taken up by large cells in the caudal third of the SN was transported to portions of the striatum, but not to thalamic nuclei. Labeled nigral neurons in the medial two-thirds of the rostral half of the SN, and in the middle third of the central part of the SN, transported the label mainly to parts of the caudate nucleus and putamen. In these animals modest radioactive label was seen in VLm and VAmc, but not in other thalamic nuclei. There was no evidence that nigral neurons project to the subthalamic nucleus. No radioactive transport from nigral neurons was detected in the superior colliculus, the midbrain tegmentum, or the red nucleus, and none was transported to more caudal brain stem nuclei. Nigrothalamic fibers arise particularly from cells in rostral and lateral parts of the substantia nigra. While some cells in other parts of the nigra project to thalamic nuclei, these appear scattered and less numerous. Large cells in caudal parts of the SN do not

  18. Report: EPA Managers Did Not Hold Supervisors and Project Officers Accountable for Grants Management

    EPA Pesticide Factsheets

    Report #2005-P-00027, September 27, 2005. Managers did not sufficiently hold supervisors and project officers accountable for grants management because there is no process to measure most grants management activity.

  19. DOE Contribution to the 2015 US CLIVAR Project Office Budget

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DeWeaver, Eric; Patterson, Michael

    The primary goal of the US Climate Variability and Predictability (CLIVAR) Project Office is to enable science community planning and implementation of research to understand and predict climate variability and change on intraseasonal-to-centennial timescales, through observations and modeling with emphasis on the role of the ocean and its interaction with other elements of the Earth system, and to serve the climate community and society through the coordination and facilitation of research on outstanding climate questions.

  20. Virtual Airspace Modeling and Simulation (VAMS) Project First Technical Interchange Meeting

    NASA Technical Reports Server (NTRS)

    Beard, Robert; Kille, Robert; Kirsten, Richard; Rigterink, Paul; Sielski, Henry; Gratteau, Melinda F. (Editor)

    2002-01-01

    A three-day NASA Virtual Airspace and Modeling Project (VAMS) Technical Interchange Meeting (TIM) was held at the NASA Ames Research Center in Mountain View, CA. on May 21 through May 23,2002. The purpose of this meeting was to share initial concept information sponsored by the VAMS Project. An overall goal of the VAMS Project is to develop validated, blended, robust and transition-able air transportation system concepts over the next five years that will achieve NASA's long-term Enterprise Aviation Capacity goals. This document describes the presentations at the TIM, their related questions and answers, and presents the TIM recommendations.

  1. Analysis of Florida Department Of Transportation Transit Corridor Program/Projects: Technical Memorandum Number Three - General Recommendations

    DOT National Transportation Integrated Search

    2001-03-01

    CUTR interviewed FDOT personnel at both the Central Office and Distict Offices and agency personnel to discuss the strengths and weaknesses of the overall Transit Corridor Program, including the results of specific projects, as well as the FDOT proce...

  2. An Evaluation of the Science Education Component of the Cross River State Science and Technical Education Project

    ERIC Educational Resources Information Center

    Ekuri, Emmanuel Etta

    2012-01-01

    The Cross River State Science and Technical Education Project was introduced in 1992 by edict number 9 of 20 December 1991, "Cross River State Science and Technical Education Board Edit, 20 December, 1991", with the aim of improving the quality of science teaching and learning in the state. As the success of the project depends…

  3. 78 FR 53477 - Notice of Relocation of the Bureau of Land Management's San Pedro Project Office in Sierra Vista, AZ

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-29

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLAZG02000.L143000000.EQ0000.TAS:14X1109.241A] Notice of Relocation of the Bureau of Land Management's San Pedro Project Office in Sierra Vista... relocation of the Bureau of Land Management's (BLM) San Pedro Project Office (SPPO), temporary closure of the...

  4. Copyrighted Software | OSTI, US Dept of Energy Office of Scientific and

    Science.gov Websites

    Technical Information Skip to main content Scientific and Technical Information Program The home of the U.S. Department of Energy's Scientific and Technical Information Program (STIP) Here you Energy U.S. Department of Energy Office of Science Office of Scientific and Technical information Website

  5. Weatherization Assistance Program Technical Assistance Center

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robert Adams

    2009-01-07

    The following is a synopsis of the major achievements attributed to the operation of the Weatherization Assistance Program Technical Assistance Center (WAPTAC) by the National Association for State Community Services Programs (NASCSP). During the past five years, the WAPTAC has developed into the premier source for information related to operating the Weatherization Assistance Program (WAP) at the state and local levels. The services provide through WAPTAC include both virtual technical support as well as hands-on training and instruction in classroom and in the field. The WAPTAC achieved several important milestones during its operation including the establishment of a national Weatherizationmore » Day now celebrated in most states, the implementation of a comprehensive Public Information Campaign (PIC) to raise the awareness of the Program among policy makers and the public, the training of more than 150 new state managers and staff as they assume their duties in state offices around the country, and the creation and support of a major virtual information source on the Internet being accessed by thousands of staff each month. The Weatherization Assistance Program Technical Assistance Center serves the Department of Energy's (DOE) Office of Weatherization and Intergovernmental Program as a valuable training and technical assistance resource for the network of 54 direct state grantees (50 states, District of Columbia and three Native American tribes) and the network of 900 local subgrantees (comprised of community action agencies, units of local government, and other non-profit organizations). The services provided through WAPTAC focus on standardizing and improving the daily management of the WAP. Staff continually identify policies changes and best practices to help the network improve its effectiveness and enhance the benefits of the Program for the customers who receive service and the federal and private investors. The operations of WAPTAC are separated into

  6. 77 FR 2968 - Pomperaug Hydro Project, Andrew Peklo III; Notice Establishing Deadline for Comments and Reply...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12790-001] Pomperaug Hydro Project, Andrew Peklo III; Notice Establishing Deadline for Comments and Reply Comments On December 15, 2011, the Commission issued notice that Office of Energy Projects staff will hold a site visit and technical meeting on January 18, 2012. The...

  7. Final Technical Report of Project DE-FG02-96ER14647

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lundeen, Stephen R.

    This is the final technical report of work completed under DOE support over the period Sept. 1, 1996 until May 31, 2015. The title of the project was "Ion/Excited Atom Collision Studies with a Rydberg Target and a CO2 Laser" from 9/1/96 to 10/31/06, and "Properties of Actinide Ions from Measurements of Rydberg Ion Fine Structure" from 11/1/06 until 5/31/15. The primary technical results were a detailed experimental study of resonant charge transfer between Rydberg atoms and highly-charged ions, and unique measurements of many properties of multiply-charged Thorium ions.

  8. US Department of Energy Grand Junction Projects Office Remedial Action Project, final report of the decontamination and decommissioning of Building 36 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. Building 36more » was found to be radiologically contaminated and was demolished in 1996. The soil beneath the building was remediated in accordance with identified standards and can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  9. Lincoln County nuclear waste project. Quarterly progress report, October 1, 1991--December 31, 1991

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-03-01

    This document included the following three progress reports to the Yucca Mountain Project Office on radioactive waste storage in Lincoln County, Nevada: financial status report; federal cash transactions report; and technical progress report.

  10. Lincoln County nuclear waste project. Quarterly progress report, January 1, 1992--March 31, 1992

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-03-01

    This document included the following three progress reports to the Yucca Mountain Project Office on radioactive waste storage in Lincoln County, Nevada: financial status report; federal cash transactions report; and technical progress report.

  11. Lincoln County nuclear waste project quarterly progress report, April 1, 1992--June 30, 1992

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-03-01

    This document included the following three progress reports to the Yucca Mountain Project Office on radioactive waste storage in Lincoln County, Nevada: financial status report; federal cash transactions report; and technical progress report.

  12. Fox Valley Technical College New Occupational Markets: Market Research Project Results.

    ERIC Educational Resources Information Center

    Mishler, Carol

    This is a report on the results of a market research project conducted by Fox Valley Technical College (FVTC) (Wisconsin) to identify new occupational markets in the college's service area. The college scanned national job lists, employment databases, and northeastern Wisconsin employer advertisements. The college also surveyed employers in the…

  13. TRU waste lead organization -- WIPP Project Office Interface Management semi-annual report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Guerrero, J.V.; Gorton, J.M.

    1985-05-01

    The Charter establishing the Interface Control Board and the administrative organization to manage the interface of the TRU Waste Lead Organization and the WIPP Project Office also requires preparation of a summary report describing significant interface activities.'' This report includes a discussion of Interface Working Group (IWG) recommendations and resolutions considered and implemented'' over the reporting period October 1984 to March 1985.

  14. 76 FR 56973 - Office of National Marine Sanctuaries Final Policy and Permit Guidance for Submarine Cable Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-15

    ... National Marine Sanctuaries Final Policy and Permit Guidance for Submarine Cable Projects AGENCY: Office of National Marine Sanctuaries (ONMS), National Oceanic and Atmospheric Administration (NOAA), Department of... Marine Sanctuaries (ONMS) has developed final policy and permitting guidance for submarine cable projects...

  15. The healthy workplace project: Reduced viral exposure in an office setting.

    PubMed

    Reynolds, Kelly A; Beamer, Paloma I; Plotkin, Kevin R; Sifuentes, Laura Y; Koenig, David W; Gerba, Charles P

    2016-05-03

    Viral illnesses such as gastroenteritis and the common cold create a substantial burden in the workplace due to reduced productivity, increased absenteeism, and increased health care costs. Behaviors in the workplace contribute to the spread of human viruses via direct contact between hands, contaminated surfaces, and the mouth, eyes, and/or nose. This study assessed whether implementation of the Healthy Workplace Project (HWP) (providing hand sanitizers, disinfecting wipes, facial tissues, and use instructions) would reduce viral loads in an office setting of approximately 80 employees after seeding fomites and the hands of volunteer participants with an MS-2 phage tracer. The HWP significantly reduced viable phage detected on participants' hands, communal fomites, and personal fomites (p ≤ .010) in office environments and presents a cost-effective method for reducing the health and economic burden associated with viral illnesses in the workplace.

  16. 78 FR 57264 - Final Waiver and Extension of the Project Period for the Technical Assistance Coordination Center

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-18

    ...: 84.326Z.] Final Waiver and Extension of the Project Period for the Technical Assistance Coordination... project period. SUMMARY: The Secretary waives the requirements in the Education Department General Administrative Regulations that generally prohibit project periods exceeding five years and extensions of project...

  17. Technical Feasibility Aspects of the Geothermal Resource Reporting Methodology (GRRM)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Badgett, Alex; Young, Katherine R; Dobson, Patrick F.

    This paper reviews the technical assessment of the Geothermal Research Reporting Methodology (GRRM, http://en.openei.org/wiki/GRRM) being developed for reporting geothermal resources and project progress. The goal of the methodology is to provide the U.S. Department of Energy's Geothermal Technologies Office (GTO) with a consistent and comprehensible means of evaluating the impacts of its funding programs. The GRRM is designed to provide uniform assessment criteria for geothermal resource grades and developmental phases of geothermal resource exploration and development. This resource grade system provides information on twelve attributes of geothermal resource locations (e.g., temperature, permeability, land access) to indicate potential for geothermal development.more » The GTO plans to use these Protocols to help quantitatively identify the greatest barriers to geothermal development, develop measureable program goals that will have the greatest impact to geothermal deployment, objectively evaluate proposals based (in part) on a project's ability to contribute to program goals, monitor project progress, and report on GTO portfolio performance. The GRRM assesses three areas of geothermal potential: geological, socio-economic, and technical. Previous work and publications have discussed the work done on the geological aspects of this methodology (Young et al. 2015c); this paper details the development of the technical assessment of the GRRM. Technical development attributes considered include: reservoir management, drilling, logistics, and power conversion.« less

  18. Grand Junction Projects Office Remedial Action Project Building 2 public dose evaluation. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Morris, R.

    1996-05-01

    Building 2 on the U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) site, which is operated by Rust Geotech, is part of the GJPO Remedial Action Program. This report describes measurements and modeling efforts to evaluate the radiation dose to members of the public who might someday occupy or tear down Building 2. The assessment of future doses to those occupying or demolishing Building 2 is based on assumptions about future uses of the building, measured data when available, and predictive modeling when necessary. Future use of the building is likely to be as an office facility. Themore » DOE sponsored program, RESRAD-BUILD, Version. 1.5 was chosen for the modeling tool. Releasing the building for unrestricted use instead of demolishing it now could save a substantial amount of money compared with the baseline cost estimate because the site telecommunications system, housed in Building 2, would not be disabled and replaced. The information developed in this analysis may be used as part of an as low as reasonably achievable (ALARA) cost/benefit determination regarding disposition of Building 2.« less

  19. 77 FR 37284 - Technical Amendments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-21

    ... DEPARTMENT OF LABOR Office of Workers' Compensation Programs 20 CFR Parts 701, 702, 703, 725, and 726 RIN 1240-AA05 Technical Amendments AGENCY: Office of Workers' Compensation Programs, Labor. ACTION: Final rule. SUMMARY: The Office of Workers' Compensation Programs is making [[Page 37285

  20. Technical Assistance and Training from the Document Design Project. Final Report.

    ERIC Educational Resources Information Center

    American Institutes for Research, Washington, DC.

    Contained in this report is a description of the technical assistance and training phase of the Document Design Project, a program funded by the National Institute of Education and intended to address and correct the readability problems posed by public documents. The first section of the report provides background material on the assistance and…

  1. The New Planned Giving Officer.

    ERIC Educational Resources Information Center

    Jordan, Ronald R.; Quynn, Katelyn L.

    1994-01-01

    A planned giving officer is seen as an asset to college/university development for technical expertise, credibility, and connections. Attorneys, certified public accountants, bank trust officers, financial planners, investment advisers, life insurance agents, and real estate brokers may be qualified but probably also need training. (MSE)

  2. Scientific and Technical Publishing at Goddard Space Flight Center in Fiscal Year 1994

    NASA Technical Reports Server (NTRS)

    1994-01-01

    This publication is a compilation of scientific and technical material that was researched, written, prepared, and disseminated by the Center's scientists and engineers during FY94. It is presented in numerical order of the GSFC author's sponsoring technical directorate; i.e., Code 300 is the Office of Flight Assurance, Code 400 is the Flight Projects Directorate, Code 500 is the Mission Operations and Data Systems Directorate, Code 600 is the Space Sciences Directorate, Code 700 is the Engineering Directorate, Code 800 is the Suborbital Projects and Operations Directorate, and Code 900 is the Earth Sciences Directorate. The publication database contains publication or presentation title, author(s), document type, sponsor, and organizational code. This is the second annual compilation for the Center.

  3. Avoidable Technical and Clinical Denial Write-Off Management in Hospitals, Physician Offices, and Clinics.

    PubMed

    Terra, Sandra Marlene; Byrne, Amanda

    2016-01-01

    This article reviews the various types of technical and clinical denials that are usually "written off" and proposes strategies to prevent this loss. For purposes of this writing, avoidable technical and clinical denial write-offs are defined as revenue lost from "first-pass" denials rejections. For example, a procedure that requires an authorization is performed without having had an authorization obtained. After appeals and attempts to recoup the revenue, often unsuccessful, the organization ultimately "writes off" the revenue as not collectable. The question to ask is: Are these claims really not collectable or can actionable steps be taken to conserve these dollars and improve the bottom line? Acute care hospitals, physician offices, and clinics. In today's environment, the need to manage costs is ubiquitous. Cost management is on the priority list of all savvy health care executives, even if margins are healthy, revenue is under pressure, and the magnitude of cost reduction needed is greater than what past efforts have achieved. As hospitals and physician clinics prioritize areas for improvement, reduction in lost revenue-especially avoidable lost revenue-should be at the top of the list. Attentively managing claim denial write-offs will significantly reduce lost revenue. There is significant interface between case management and the revenue cycle. Developing core competencies for reducing clinical and technical denials should be a critical imperative in overall cost management strategy. Case managers are well placed to prevent these unnecessary losses through accurate status determination and clinical documentation review. These clinical professionals can also provide insight into work flow and other processes inherent in the preauthorization process.

  4. 77 FR 30512 - Native American Career and Technical Education Program; Final Waivers and Extension of Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-23

    ... DEPARTMENT OF EDUCATION Native American Career and Technical Education Program; Final Waivers and... American Career and Technical Education Program Catalog of Federal Domestic Assistance (CFDA) Number: 84.101A. SUMMARY: For 60-month projects funded in fiscal year (FY) 2007 under the Native American Career...

  5. An Approach to Tailoring Major Technical Reviews Based on Project Characteristics and Stakeholder Interests

    NASA Technical Reports Server (NTRS)

    Richstein, Alan B.; Nolte, Jerome T.; Pfarr, Barbara B.

    2004-01-01

    There are numerous technical reviews that occur throughout the systems engineering process life cycle. Many are well known by project managers and stakeholders such as developers and end users, an example of much is the critical design review (CDR). This major milestone for a large, complex new project may last two or more days, include an extensive agenda of topics, and entail hundreds of hours of developer time to prepare presentation materials and associated documents. Additionally, the weeks of schedule spent on review preparation is at least partly at the expense of other work. This paper suggests an approach for tailoring technical reviews, based on the project characteristics and the project manager s identification of the key stakeholders and understanding of their most important issues and considerations. With this insight the project manager can communicate to, manage expectations oc and establish formal agreement with the stakeholders as to which reviews, and at what depth, are most appropriate to achieve project success. The authors, coming from diverse organizations and backgrounds, have drawn on their personal experiences and summarized the best practices of their own organizations to create a common framework to provide guidance on the adaptation of design reviews to other system engineers.

  6. US Department of Energy Grand Junction Projects Office Remedial Action Project. Final report of the decontamination and decommissioning of Building 52 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Krabacher, J.E.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also was the remedial action contractor. Building 52more » was found to be radiologically contaminated and was demolished in 1994. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  7. Understanding the Influence Career Paths Have on Community and Technical College Chief Business Officers' Satisfaction with Their Position: A Mixed Method Investigation

    ERIC Educational Resources Information Center

    File, Carter L.

    2013-01-01

    This study was undertaken to understand whether a community or technical college chief business officer's career line influenced the lived experience of job satisfaction. This mixed method study was conducted in a two-phase approach using the Explanatory Design: Participant Selection Model variant. An initial quantitative survey was conducted from…

  8. Evaluation of Title I ESEA Projects, 1976-77: Technical Reports. Report #77140.

    ERIC Educational Resources Information Center

    Philadelphia School District, PA. Office of Research and Evaluation.

    This volume compiles technical reports of Title I Elementary and Secondary Education Act project evaluations conducted during the 1976-77 academic year in the school district of Philadelphia, Pennsylvania. The reports include rationale, expected outcomes, mode of operation, previous evaluative findings, current implementation, and attainment of…

  9. Estimates of the Officer Force Structure Required to Man the Projected Naval Combatant Forces of the 1980s and 1990s.

    DTIC Science & Technology

    1980-10-01

    Element, 64709N Prototype Manpower/Personnel Systems (U), Project Z1302-PN Officer Career Models (U), funded by the Office of the Deputy Assistant... Models for Navy Officer Billets portion of the proposed NPS research effort to develop an integrated officer system planning model ; the purpose of this...attempting to model the Naval officer force structure as a system. This study considers the primary first order factors which drive the requirements

  10. West Hackberry Tertiary Project. Quarterly technical progress report, July 1--September 30, 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    The goal of the West Hackberry Tertiary Project is to demonstrate the technical and economic feasibility of combining air injection with the Double Displacement Process for tertiary oil recovery. The Double Displacement Process is the gas displacement of a water invaded oil column for the purpose of recovering oil through gravity drainage. The novel aspect of this project is the use of air as the injection fluid. The target reservoir for the project is the Camerina C-1,2,3 Sand located on the West Flank of West Hackberry Field in Cameron Parish, Louisiana. If successful, this project will demonstrate that the usemore » of air injection in the Double Displacement Process can economically recover oil in reservoirs where tertiary oil recovery is presented uneconomic. During this quarter, the West Hackberry Tertiary Project completed the first ten months of air injection operations. Plots of air injection rates and cumulative air injected are included in this report as attachments. The following events are reviewed in this quarter`s technical progress report: (1) successful workovers on the Gulf Land D Nos. 44, 45 and 51 and the Watkins No. 3; (2) the unsuccessful repair attempt on the Watkins No. 16; (3) gathering of additional bottom hole pressure data; (4) air compressor operations and repairs; and (5) technology transfer activities.« less

  11. Final Technical Report of the project "Controlling Quantum Information by Quantum Correlations"

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Girolami, Davide

    The report describes hypotheses, aims, methods and results of the project 20170675PRD2, “Controlling Quantum Information by Quantum Correlations”, which has been run from July 31, 2017 to January 7, 2018. The technical work has been performed by Director’s Fellow Davide Girolami of the T-4 Division, Physics of Condensed Matter and Complex Systems, under the supervision of Wojciech Zurek (T-4), Lukasz Cincio (T-4), and Marcus Daniels (CCS-7). The project ended as Davide Girolami has been converted to J. R. Oppenheimer Fellow to work on the project 20180702PRD1, “Optimal Control of Quantum Machines”, started on January 8, 2018.

  12. Statewide Curriculum Articulation Project for Vocational-Technical Education in Minnesota. Final Report.

    ERIC Educational Resources Information Center

    Burger, Laura J.; And Others

    The goal of this project was to develop, validate, and utilize a process for vertically articulating curriculum between secondary and post secondary levels of vocational technical education throughout the state of Minnesota. Procedures involved the identification of two areas of staff responsibility: research and development, and service to local…

  13. Army Officer Job Analysis: Identifying Performance Requirements to Inform Officer Selection and Assignment

    DTIC Science & Technology

    2011-08-01

    ABSTRACT (Maximum 200 words): This report includes lists of leadership and technical duties performed by all Army officers and the skills...proficiency, and we called these Major Duties (MDs). We compiled lists of major duties (MDs) performed by all officers in each of the five positions...26  TABLE 4.1. NUMBER OF SMES WHO REVIEWED DESCRIPTOR LISTS ACROSS ALL SITES

  14. The VEPSY UPDATED Project: clinical rationale and technical approach.

    PubMed

    Riva, G; Alcãniz, M; Anolli, L; Bacchetta, M; Baños, R; Buselli, C; Beltrame, F; Botella, C; Castelnuovo, G; Cesa, G; Conti, S; Galimberti, C; Gamberini, L; Gaggioli, A; Klinger, E; Legeron, P; Mantovani, F; Mantovani, G; Molinari, E; Optale, G; Ricciardiello, L; Perpiñá, C; Roy, S; Spagnolli, A; Troiani, R; Weddle, C

    2003-08-01

    More than 10 years ago, Tart (1990) described virtual reality (VR) as a technological model of consciousness offering intriguing possibilities for developing diagnostic, inductive, psychotherapeutic, and training techniques that can extend and supplement current ones. To exploit and understand this potential is the overall goal of the "Telemedicine and Portable Virtual Environment in Clinical Psychology"--VEPSY UPDATED--a European Community-funded research project (IST-2000-25323, www.cybertherapy.info). Particularly, its specific goal is the development of different PC-based virtual reality modules to be used in clinical assessment and treatment of social phobia, panic disorders, male sexual disorders, obesity, and eating disorders. The paper describes the clinical and technical rationale behind the clinical applications developed by the project. Moreover, the paper focuses its analysis on the possible role of VR in clinical psychology and how it can be used for therapeutic change.

  15. Exploration studies technical report, FY1988 status. Volume 1: Technical summary

    NASA Technical Reports Server (NTRS)

    1988-01-01

    The Office of Exploration (OEXP) at NASA Headquarters has been tasked with defining and recommending alternatives for an early 1990's nationaL decision on a focused program of human exploration of the solar system. The Mission Analysis and System Engineering (MASE) group, which is managed by the Exploration Studies Office at the Lyndon B. Johnson Space Center, is responsible for coordinating the technical studies necessary for accomplishing such a task. This technical report, produced by the MASE, describes the process that has been developed in a case study approach. The four case studies developed in FY88 include: (1) Human Expedition to Phobos; (2) Human Expedition to Mars; (3) Lunar Observatory; and (4) Lunar Outpost to Early Mars Evolution. The final outcome of this effort is a set of programmatic and technical conclusions and recommendations for the following year's work.

  16. 48 CFR 825.870 - Technical assistance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Technical assistance. 825... SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Other International Agreements and Coordination 825.870 Technical assistance. Contracting officers may obtain technical information or guidance on international agreements and...

  17. 78 FR 36578 - Agency Information Collection Activities; Proposed Collection; Comments Requested: Office for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-18

    ... Collection; Comments Requested: Office for Victims of Crime Training and Technical Assistance Center (OVC...; Businesses or other for-profit. Abstract: The Office for Victims of Crime Training and Technical Assistance... will deliver these forms to recipients of online training and technical assistance and, in some cases...

  18. 75 FR 54063 - Demand Response Compensation in Organized Wholesale Energy Markets; Technical Conference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-03

    ... FURTHER INFORMATION CONTACT: David Hunger (Technical Information), Office of Energy Policy and Innovation....hunger@ferc.gov . Caroline Daly (Technical Information), Office of Energy Policy and [[Page 54064... information about the technical conference or comment procedures, please contact: David Hunger (Technical...

  19. An evaluation of client satisfaction with training programs and technical assistance provided by Florida's Coordinated School Health Program Office.

    PubMed

    Weiler, R M; Pigg, R M

    2000-11-01

    Client or customer satisfaction surveys assess the perceived quality of programs, products, services, and employee performance. Such assessments prove beneficial for evaluation and planning purposes. This survey examined the satisfaction of clients using the programs, services, and technical assistance provided through the Coordinated School Health Program Office (CSHPO) in the Florida Department of Education. Using the 42-item Client Satisfaction Survey, data were collected in summer 1999 from 300 of 574 clients (52.3%) who attended training sessions or sought technical assistance from CSHPO during 1996-1999. More than two-thirds (67.2%) of clients rated the training program as "very good" or "excellent" at increasing their understanding about the concept of a coordinated school health program. Overall, 69.7% of clients rated the training programs they attended as "very good" or "excellent." Resource materials and staff effectiveness rated positively as well. Findings confirmed client satisfaction with CSHPO's training programs, technical assistance, and staff. Information obtained through the client satisfaction survey can be used by CSHPO to assist in future program planning and resource allocations.

  20. Community Colleges Broadening Horizons through Service Learning, 2003-2006. Project Brief. AACC-PB-04-2

    ERIC Educational Resources Information Center

    Robinson, Gail

    2004-01-01

    The "Horizons" project features model programs, national data collection and dissemination, and an information clearinghouse. In addition, "Horizons" provides professional development opportunities and technical assistance through regional workshops on service learning and civic responsibility, chief academic officer summits,…

  1. Annual Report 2008 -- Office of the Chief Financial Officer (OCFO)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fernandez, Jeffrey

    2008-12-22

    It is with great pleasure that I present to you the 2008 Chief Financial Officer's Annual Report. The data included in this report has been compiled from the Budget Office, the Controller, Procurement and Property Management and the Sponsored Projects Office. Also included are some financial comparisons with other DOE Laboratories and a glossary of commonly used acronyms.

  2. Strategic petroleum reserve supporting research. Quarterly technical report, January 1-March 31, 1986

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Woodward, P.W.

    1986-01-01

    The basic objective is to provide technical support to the Strategic Petroleum Reserve Office (SPRO), through the Bartlesville Project Office. This support includes routine analyses, experimental research, and technical consultation at the SPRO's request. Accomplishments for this past quarter include: stable D, /sup 34/S, and /sup 13/C isotope ratio analyses for 27 samples of SPR crude oil; gas chromatographic simulated distillation (Sim-dis) of 74 SPR crude samples; sim-dis of sludge samples to check for bimodal distributions; data for 8 comprehensive analyses have been entered into the Bonner and Moore ''Crude Assay II'' library; 25 samples which included both whole crudesmore » and distillate fractions were chromatographed using Siemens dual-oven GC and PIANO software; separation of 4 sludge samples into acid, base, and neutral fractions by ion exchange chromatography; and proton and sodium-23 NMR measurements of sludge samples. 1 fig., 5 tabs.« less

  3. Chemical research projects office fuel tank sealants review. [flight testing of fluorosilicone sealants

    NASA Technical Reports Server (NTRS)

    Rosser, R. W.; Parker, J. A.

    1974-01-01

    The status of high-temperature fuel tank sealants for military and potentially commercial supersonic aircraft is examined. The interrelationships of NASA's sealants program comprise synthesis and development of new fluoroether elastomers, sealant prediction studies, flight simulation and actual flight testing of best state-of-the-art fluorosilicone sealants. The technical accomplishments of these projects are reviewed.

  4. 77 FR 9214 - Notice of Proposed Waiver and Extension of Project Period for the Native Hawaiian Career and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-16

    ... DEPARTMENT OF EDUCATION Notice of Proposed Waiver and Extension of Project Period for the Native Hawaiian Career and Technical Education Program AGENCY: Office of Vocational and Adult Education, Department of Education. [[Page 9215

  5. Office of Inspector General audit report on credit card usage at the Ohio Field Office and the Fernald and Miamisburg Environmental Management Projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1999-03-01

    In 1994 the Department of Energy (Department) obtained the services of Rocky Mountain BankCard System, through the use of a General Services Administration contract, as a means for the Department and its contractors to make small purchases. The use of credit cards was expected to simplify small purchase procedures and improve cash management. The Ohio Field Office (Field Office) uses the credit card system and oversees usage by its area offices. Contractors under the Field Office also use the credit card system to make small purchases. The Office of Inspector General (OIG) has issued one audit report concerning the usemore » of credit cards. In April 1996, the OIG issued Report WR-B-96-06, Audit of Bonneville Power Administration`s Management of Information Resources. The audit concluded that improvements could be made in implementing credit card and property procedures in Bonneville`s management of computer-related equipment. Specifically, many credit card purchases were made by employees whose authority to buy was not properly documented, and the purchasing files often lacked invoices that would show what was purchased. Additionally, some cardholders split purchases to avoid credit card limits. The objective of this audit was to determine whether the Field Office, Fernald and Miamisburg Environmental Management Projects, Fluor Daniel, and B and W were using credit cards for the appropriate purposes and within the limitations established by Federal and Departmental regulations.« less

  6. 48 CFR 942.270-1 - Contracting Officer's Representatives.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... performing certain technical functions in administering a contract. These functions include, but are not limited to, technical monitoring, inspection, approval of shop drawings, testing, and approval of samples. The COR acts solely as a technical representative of the contracting officer and is not authorized to...

  7. [Psychiatric patients and relatives instruct German police officers - an anti-stigma project of "BASTA - the alliance for mentally ill people"].

    PubMed

    Wundsam, Kerstin; Pitschel-Walz, Gabi; Leucht, Stefan; Kissling, Werner

    2007-05-01

    Contact with police officers due to schizophrenia and resort to violence in such interactions is a common occurrence and represents a source for stigmatisation of mentally ill people. Aim of this project was to establish a program for police officers to reduce that stigma. The seminar was developed by a German anti-stigma organisation in cooperation with sociology teachers of the Bavarian police academy. Evaluations focussed on the police officers "social distance" and "negative stereotypes" towards mentally ill people. The personal contact between officers and the referees (patients, relatives, professionals) was the core of the seminar. Results of a debriefing after the pilot-project was overall positive. Evaluations in the renewal years showed significant improvement within the scale "social distance" (p < 0.0001) and amelioration in the stereotype-categories "violence" and "treatability". The need for special training of the police regarding mental illnesses was acknowledged by all participants. Personal contact of police officers with patients and relatives appeared to be important for the efficacy of this seminar and should become a main focus in similar anti-stigma interventions.

  8. Technical Assistance in Evaluating Career Education Projects. Final Report. Volume II: Final Career Education Evaluation Report.

    ERIC Educational Resources Information Center

    Stenner, A. Jackson; And Others

    This document contains the second of five volumes reporting the activities and results of a career education evaluation project conducted to accomplish the following two objectives: (1) to improve the quality of evaluations by career education projects funded by the United States Office of Career Education (OCE) through the provision of technical…

  9. Research and Grant Management: The Role of the Project Management Office (PMO) in a European Research Consortium Context

    ERIC Educational Resources Information Center

    Wedekind, Gerben Kristian; Philbin, Simon Patrick

    2018-01-01

    This paper illustrates how a university-based project management office (PMO) can provide focused support across the entire grant project lifecycle within a European research context. In recent years, EU (European Union) research and innovation grant programs have increasingly shifted to support multidisciplinary consortia composed of industry,…

  10. Final Report of Technical Assistance Provided to Guarantee Agencies with Recommendations for Further Improving Program Performance.

    ERIC Educational Resources Information Center

    Touche Ross and Co., Washington, DC.

    Technical assistance provided to loan guarantee agencies by Touche Ross and Co. under contract to the U.S. Office of Education (OE) is described. Objectives of the report are: to summarize the work performed and the results of each of the projects that were conducted; to describe certain prototype systems that were developed for the guarantee…

  11. Increasing student confidence in technical and professional skills through project based learning

    NASA Astrophysics Data System (ADS)

    Robinson, Alice L.

    This work focuses on developing undergraduate students' technical and professional skills through a project-based spiral curriculum in the Agricultural & Biological Engineering department at Purdue that can be implemented campus wide. Through this curriculum, Purdue engineers will be prepared for leadership roles in responding to the global technological, economic, and societal challenges of the 21st century by exposure to the relationships between engineering and its impacts on real world needs and challenges. Project-based learning uses projects as the focus of instruction and has shown increased understanding, motivation, and confidence through application of engineering principles to real-world problems. The strength of a spiral curriculum is that it continually revisits basic ideas and themes with increasing complexity and sophistication. The proposed spiral curriculum incorporates the target attributes of the Purdue Engineer of 2020 through project based courses during sophomore, junior, and senior year. These courses will build on concepts taught during first year engineering as well. The Engineer of 2020 (NAE and Purdue) target attributes include strong technical and professional skills to solve societal and technological burdens. A prototype course has been developed, taught, and evaluated during the previous two fall semesters in the sophomore level of the Biological and Food Process Engineering curriculum. The target students met 3 hours a week in a traditional lecture setting plus 2 hours a week in a project based lab setting. The control group met only 3 hours a week in a traditional lecture setting. Peer and self assessment results from student surveys show increased confidence in every area surveyed. Focus groups revealed student reactions to the course. Students enjoyed the course but felt it difficult to handle ambiguity with project work. Future work includes course revisions to the content, assessment, and pedagogy of the prototype class

  12. STP 4-06 Model-Based Technical Data in Procurement, 3D PDF Technology Data Demonstration Project. Phase 1 Summary

    DTIC Science & Technology

    2015-07-01

    O R G STP 4-06 MODEL-BASED TECHNICAL DATA IN PROCUREMENT 3D PDF TECHNOLOGY DATA DEMONSTRATION PROJECT PHASE 1 SUMMARY REPORT DL309T2...LMI’s ISO- certified quality management procedures. J U L Y 2 0 1 5 STP 4-06 MODEL-BASED TECHNICAL DATA IN PROCUREMENT 3D PDF TECHNICAL DATA...Based Technical Data ..................................................................................... 5 3D PDF Demonstration Team

  13. ORD Scientific and Engineering Technical Support for RPMs – Ground Water Technical Support Center

    EPA Science Inventory

    ORD Scientific and Engineering Technical Support for RPMs (and Others) is a hybrid informational and panel session that focuses on the technical support available from EPA’s Office of Research and Development (ORD) to RPMs and other EPA cleanup program staff. Examples of technica...

  14. 24 CFR 115.209 - Technical assistance.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Technical assistance. 115.209... Substantially Equivalent Agencies § 115.209 Technical assistance. (a) The Assistant Secretary, through the FHEO regional office, may provide technical assistance to the interim and certified agencies at any time. The...

  15. Technical Training for Managers.

    ERIC Educational Resources Information Center

    Haverland, Edgar M.

    The question has arisen as to what kind of information a manager without extensive technical training needs to learn to supervise effectively. For example, the Nike Hercules fire control platoon leader, usually an officer in his first active duty assignment, seldom has had extensive technical training. Yet he is responsibile for the…

  16. The NASA/JPL 64-meter-diameter antenna at Goldstone, California: Project report, technical staff, tracking and data acquisition organization

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The significant management and technical aspects of the JPL Project to develop and implement a 64-meter-diameter antenna at the Goldstone Deep Space Communications Complex in California, which was the first of the Advanced Antenna Systems of the National Aeronautics and Space Administration/Jet Propulsion Laboratory Deep Space Network are described. The original need foreseen for a large-diameter antenna to accomplish communication and tracking support of NASA's solar system exploration program is reviewed, and the translation of those needs into the technical specification of an appropriate ground station antenna is described. The antenna project is delineated by phases to show the key technical and managerial skills and the technical facility resources involved. There is a brief engineering description of the antenna and its closely related facilities. Some difficult and interesting engineering problems, then at the state-of-the-art level, which were met in the accomplishment of the Project, are described. The key performance characteristics of the antenna, in relation to the original specifications and the methods of their determination, are stated.

  17. 75 FR 29732 - Career and Technical Education Program-Promoting Rigorous Career and Technical Education Programs...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-27

    ... DEPARTMENT OF EDUCATION Career and Technical Education Program--Promoting Rigorous Career and Technical Education Programs of Study Catalog of Federal Domestic Assistance (CFDA) Number: 84.051C. AGENCY: Office of Vocational and Adult Education, Department of Education. ACTION: Notice of proposed priorities...

  18. Finance Program, Technical Assistance Brief 1

    DOT National Transportation Integrated Search

    1993-01-01

    This four page pamphlet highlights the work of the Federal Transit : Administration's Office of Technical Assistance and Safety. Articles in this : issue are: Transit's Finance Challenge, which discusses the three main aspects : of the Office's Finan...

  19. 48 CFR 301.605 - Contracting Officer designation of Contracting Officer Technical Representative.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... under HHS' FAC-COTR program before delegating authority to that individual to act as a COTR. Even if an individual is FAC-COTR-certified, a candidate becomes a COTR only when a Contracting Officer provides in... order file the individual's active FAC-COTR certificate. In the event that the HCA has granted an...

  20. 48 CFR 301.605 - Contracting Officer designation of Contracting Officer Technical Representative.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... under HHS' FAC-COTR program before delegating authority to that individual to act as a COTR. Even if an individual is FAC-COTR-certified, a candidate becomes a COTR only when a Contracting Officer provides in... order file the individual's active FAC-COTR certificate. In the event that the HCA has granted an...

  1. 48 CFR 301.605 - Contracting Officer designation of Contracting Officer Technical Representative.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... under HHS' FAC-COTR program before delegating authority to that individual to act as a COTR. Even if an individual is FAC-COTR-certified, a candidate becomes a COTR only when a Contracting Officer provides in... order file the individual's active FAC-COTR certificate. In the event that the HCA has granted an...

  2. 48 CFR 301.605 - Contracting Officer designation of Contracting Officer Technical Representative.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... under HHS' FAC-COTR program before delegating authority to that individual to act as a COTR. Even if an individual is FAC-COTR-certified, a candidate becomes a COTR only when a Contracting Officer provides in... order file the individual's active FAC-COTR certificate. In the event that the HCA has granted an...

  3. 48 CFR 301.605 - Contracting Officer designation of Contracting Officer Technical Representative.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... under HHS' FAC-COTR program before delegating authority to that individual to act as a COTR. Even if an individual is FAC-COTR-certified, a candidate becomes a COTR only when a Contracting Officer provides in... order file the individual's active FAC-COTR certificate. In the event that the HCA has granted an...

  4. Project T.E.A.M. (Technical Education Advancement Modules). Advanced Statistical Process Control.

    ERIC Educational Resources Information Center

    Dunlap, Dale

    This instructional guide, one of a series developed by the Technical Education Advancement Modules (TEAM) project, is a 20-hour advanced statistical process control (SPC) and quality improvement course designed to develop the following competencies: (1) understanding quality systems; (2) knowing the process; (3) solving quality problems; and (4)…

  5. A Technical Description of the Officer Procurement Model (TOPOPS). Final Report.

    ERIC Educational Resources Information Center

    Akman, Allan; And Others

    The Total Objective Plan for the Officer Procurement System (TOPOPS) is an aggregate-level, computer-based model of the Air Force Officer procurement system developed to operate on the UNIVAC 1108 system. It is designed to simulate officer accession and training and achieve optimal solutions in terms of either cost minimization or accession…

  6. Projections for Changes in Natural and Technical Snow Reliability of a Major Turkish Ski Resort by Using RegCM4.3.5

    NASA Astrophysics Data System (ADS)

    Ozturk, Tugba; Cenk Demiroglu, O.; Tufan Turp, M.; Türkeş, Murat; Kurnaz, M. Levent

    2014-05-01

    Climate change has been and increasingly will be a major threat to the ski tourism industry whose survival is highly dependent on existence of snow cover of sufficient depth and duration. The common knowledge requires that in order for a ski resort to be viable, it has to perform operations for at least 100 days in seven out of ten winters. For this matter, it is now even more usual for the ski resorts to adapt to this issue by technical snowmaking. In this study, projected future changes for the period of 2010-2040, 2040-2070, and 2070-2100 in air temperature, relative humidity, and snow depth climatology and variability with respect to the control period of 1970-2000 were assessed for the domain of a major ski resort in Turkey. Regional Climate Model (RegCM4.3.5) of ICTP (International Centre for Theoretical Physics) was used for projections of future and present climate conditions. HadGEM2 global climate model of the Met Office Hadley Centre, MPI-ESM-MR of the Max Planck Institute for Meteorology, GFDL-ESM2M of the National Oceanic and Atmospheric Administration Geophysical Fluid Dynamics Laboratory were downscaled to 10 km for the resort and its surrounding region. Both the projections and the downscaling were realized according to the RCP4.5 and the RCP8.5 emission scenarios of the IPCC. The outputs on snow depth were used for a count of the changes on snow cover duration sufficient for skiing actitivies, signaling natural snow-reliability, whereas the outputs on air temperature and relative humidity were utilized for determination of wet-bulb temperatures. The latter measure was used to interpret the changes in the snowmaking capacity, in other words; technical snow-reliability, of the resort. This work was supported by the BU Reasearch Fund under the project number 7362. One of the authors (MLK) was partially supported by Mercator-IPC Fellowship Program.

  7. SELECTING AND TRAINING THE TRAINING OFFICER.

    ERIC Educational Resources Information Center

    TAYLOR, NANCY

    TO ACHIEVE THE OBJECTIVES OF TRAINING IN INDUSTRY--TECHNICAL AND LIBERAL EDUCATION, SPECIFIC JOB SKILLS, AND THE DEVELOPMENT OF ATTITUDES--THE TRAINING OFFICER MUST KNOW THE COMPANY WITHIN WHICH HE IS WORKING, AS WELL AS MANAGEMENT THEORY AND TRAINING METHODS. THE SELECTION OF TRAINING OFFICERS IS BASED ON A JOB SPECIFICATION, AN OUTGROWTH OF A…

  8. A Compilation of Articles Reporting Research Sponsored by the Office of Naval Research

    DTIC Science & Technology

    1980-07-01

    i-A /VGR P Technical Reports Nos 378,379,380,381 and 382 A COMPILATION OF ARTICLES REPORTING RESEARCH SPONSORED BY THE OFFICE OF NAVAL RESEARCH...SPONSORED BY ( THE OFFICE OF NAVAL RESEARCH#’ "I ZIP Office o ---- Contract JINY(601-Z.7-OO502IProject N 1 __ terge C, Anderson Associate Chairman for...SPONSORED BY THE OFFICE OF NAVAL RESEARCH TECHNICAL REPORT NO. 378 The Depth Variability of Meridional Gradients of Temperature, Salinity and Sound

  9. 77 FR 30514 - Native Hawaiian Career and Technical Education Program; Final Waiver and Extension of Project Period

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-23

    ... DEPARTMENT OF EDUCATION Native Hawaiian Career and Technical Education Program; Final Waiver and.... ACTION: Notice. Overview Information Final Waiver and Extension of Project Period for the Native Hawaiian.... SUMMARY: For 36-month projects funded in fiscal year (FY) 2009 under the Native Hawaiian Career and...

  10. 15 CFR 1180.8 - Appointment of Agency Liaison Officers.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... SCIENTIFIC, TECHNICAL AND ENGINEERING INFORMATION TO THE NATIONAL TECHNICAL INFORMATION SERVICE § 1180.8... instruments); (3) Appoint additional liaison officers for major units or components of an agency if the...

  11. The Inventive Thinking Curriculum Project. An Outreach Program of the United States Patent and Trademark Office. Third Edition.

    ERIC Educational Resources Information Center

    Department of Commerce, Washington, DC.

    The Inventive Thinking Curriculum Project is one of the many projects included in the national outreach program of the U.S. Patent and Trademark Office. It is designed to be used in conjunction with a thinking skills program as a means of applying critical and creative thinking and problem-solving skills through the activity of creating an…

  12. 48 CFR 2052.211-71 - Technical progress report.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Technical progress report... Technical progress report. As prescribed at 2011.104-70(b), the contracting officer shall insert the... solicitation. Technical Progress Report (JAN 1993) The contractor shall provide a monthly Technical Progress...

  13. 48 CFR 2052.211-71 - Technical progress report.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Technical progress report... Technical progress report. As prescribed at 2011.104-70(b), the contracting officer shall insert the... solicitation. Technical Progress Report (JAN 1993) The contractor shall provide a monthly Technical Progress...

  14. 48 CFR 2052.211-71 - Technical progress report.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Technical progress report... Technical progress report. As prescribed at 2011.104-70(b), the contracting officer shall insert the... solicitation. Technical Progress Report (JAN 1993) The contractor shall provide a monthly Technical Progress...

  15. 48 CFR 2052.211-71 - Technical progress report.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Technical progress report... Technical progress report. As prescribed at 2011.104-70(b), the contracting officer shall insert the... solicitation. Technical Progress Report (JAN 1993) The contractor shall provide a monthly Technical Progress...

  16. Integrated Project Management: A Case Study in Integrating Cost, Schedule, Technical, and Risk Areas

    NASA Technical Reports Server (NTRS)

    Smith, Greg

    2004-01-01

    This viewgraph presentation describes a case study as a model for integrated project management. The ISS Program Office (ISSPO) developed replacement fluid filtration cartridges in house for the International Space Station (ISS). The presentation includes a step-by-step procedure and organizational charts for how the fluid filtration problem was approached.

  17. Landlord project multi-year program plan, fiscal year 1999, WBS 1.5

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dallas, M.D.

    The MYWP technical baseline describes the work to be accomplished by the Project and the technical standards which govern that work. The mission of Landlord Project is to provide more maintenance replacement of general infrastructure facilities and systems to facilitate the Hanford Site cleanup mission. Also, once an infrastructure facility or system is no longer needed the Landlord Project transitions the facility to final closure/removal through excess, salvage or demolition. Landlord Project activities will be performed in an environmentally sound, safe, economical, prudent, and reliable manner. The Landlord Project consists of the following facilities systems: steam, water, liquid sanitary waste,more » electrical distribution, telecommunication, sanitary landfill, emergency services, general purpose offices, general purpose shops, general purpose warehouses, environmental supports facilities, roads, railroad, and the site land. The objectives for general infrastructure support are reflected in two specific areas, (1) Core Infrastructure Maintenance, and (2) Infrastructure Risk Mitigation.« less

  18. Final report of the decontamination and decommissioning of Building 34 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7 acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the Grand Junction Projects Office Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, was also the remedialmore » action contractor. Building 34 was radiologically contaminated and the building was demolished in 1996. The soil area within the footprint of the building was analyzed and found to be not contaminated. The area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual closeout report for each contaminated GJPO building.« less

  19. Final report of the decontamination and decommissioning of Building 44 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-07-01

    The U.S. Department of Energy (DOE) Junction Projects Office (GJPO) occupies a 61.7 acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the Grand Junction Projects Office Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, is also the remedial actionmore » contractor. Building 44 was radiologically contaminated and the building was demolished in 1994. The soil area within the footprint of the building was not contaminated; it complies with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  20. 77 FR 16250 - Notice of Proposed Information Collection for Public Comment; Office of Native American Programs...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-20

    ... Information Collection for Public Comment; Office of Native American Programs (ONAP) Training and Technical... subject proposal. The data required by Office of Native American Programs Training and Technical... progress. The data identifies needs, outputs and outcomes of the training and technical assistance. DATES...

  1. The Challenges of Integrating NASA's Human, Budget, and Data Capital within the Constellation Program's Exploration Launch Projects Office

    NASA Technical Reports Server (NTRS)

    Kidd, Luanne; Morris, Kenneth B.; Self, Timothy A.

    2007-01-01

    The U.S. Vision for Space Exploration directs NASA to retire the Space Shuttle in 2010 and replace it with safe, reliable, and cost-effective space transportation systems for crew and cargo travel to the Moon, Mars, and beyond. Such emerging space transportation initiatives face massive organizational challenges, including building and nurturing an experienced, dedicated team with the right skills for the required tasks; allocating and tracking the fiscal capital invested in achieving technical progress against an integrated master schedule; and turning generated data into useful knowledge that equips the team to design and develop superior products for customers and stakeholders. It has been more than 30 years since the Space Shuttle was designed; therefore, the current aerospace workforce has limited experience with developing new designs for human-rated spaceflight hardware. To accomplish these activities, NASA is using a wide range of state-of-the-art information technology tools that connect its diverse, decentralized teams and provide timely, accurate information for decision makers. In addition, business professionals are assisting technical managers with planning, tracking, and forecasting resource use against an integrated master schedule that horizontally and vertically interlinks hardware elements and milestone events. Furthermore, NASA is employing a wide variety of strategies to ensure that it has the motivated and qualified staff it needs for the tasks ahead. This paper discusses how NASA's Exploration Launch Projects Office, which is responsible for delivering these new launch vehicles, integrates its resources to create an engineering business environment that promotes mission success, which is defined by replacing the Space Shuttle by 2014 and returning to the Moon by 2020.

  2. Implementing Earned Value Management in the CxP EVA Systems Project Office

    NASA Technical Reports Server (NTRS)

    Sorge, Les L.

    2009-01-01

    Earned Value Management (EVM), like project management, is as much art as it is science to develop an implementation plan for a project. This presentation will cover issues that were overcome and the implementation strategy to deploy Earned Value Management (EVM) within the Constellation Program (CxP), EVA Systems Project Office (ESPO), as well as discuss additional hurdles that currently prevent the organization from optimizing EVM. Each organization and each project within an organization needs to mold an EVM implementation plan around existing processes and tools, while at the same time revising those existing processes and tools as necessary to make them compatible with EVM. The ESPO EVM implementation covers work breakdown structure, organizational breakdown structure, control account, work/planning package development; integrated master schedule development using an integrated master plan; incorporating reporting requirements for existing funding process such as Planning, Programming, Budgeting, and Execution (PPBE) and JSC Internal Task Agreements (ITA); and interfacing with other software tools such as the Systems Applications and Products (SAP) accounting system and the CxP wInsight EVM analysis tool. However, there are always areas for improvement and EVM is no exception. As EVM continues to mature within the NASA CxP, these areas will continue to be worked to resolution to provide the Program Managers, Project Managers, and Control Account Managers the best EVM data possible to make informed decisions.

  3. 48 CFR 1852.242-70 - Technical direction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Direction (SEP 1993) (a) Performance of the work under this contract is subject to the written technical... the Contracting Officer in writing in accordance with NASA FAR Supplement 1842.270. “Technical... in writing by the COTR. (d) The Contractor shall proceed promptly with the performance of technical...

  4. 75 FR 2860 - Hydrogen and Fuel Cell Technical Advisory Committee (HTAC)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-19

    ... DEPARTMENT OF ENERGY Office of Energy Efficiency and Renewable Energy Hydrogen and Fuel Cell Technical Advisory Committee (HTAC) AGENCY: Department of Energy, Office of Energy Efficiency and Renewable Energy. ACTION: Notice of Open Meeting. SUMMARY: The Hydrogen and Fuel Cell Technical Advisory Committee...

  5. Technical Manual: easyCBM. Technical Report #1408

    ERIC Educational Resources Information Center

    Anderson, Daniel; Alonzo, Julie; Tindal, Gerald; Farley, Dan; Irvin, P. Shawn; Lai, Cheng-Fei; Saven, Jessica L.; Wray, Kraig A.

    2014-01-01

    Since the easyCBM© learning system was first published in 2006, over $8 million of federal funding (both from the Office of Special Education Programs and more recently from the Institute of Education Sciences) has been used to develop, study, and refine the assessments available on the system. This Technical Manual summarizes the ongoing research…

  6. Reengineering the Project Design Process

    NASA Technical Reports Server (NTRS)

    Casani, E.; Metzger, R.

    1994-01-01

    In response to NASA's goal of working faster, better and cheaper, JPL has developed extensive plans to minimize cost, maximize customer and employee satisfaction, and implement small- and moderate-size missions. These plans include improved management structures and processes, enhanced technical design processes, the incorporation of new technology, and the development of more economical space- and ground-system designs. The Laboratory's new Flight Projects Implementation Office has been chartered to oversee these innovations and the reengineering of JPL's project design process, including establishment of the Project Design Center and the Flight System Testbed. Reengineering at JPL implies a cultural change whereby the character of its design process will change from sequential to concurrent and from hierarchical to parallel. The Project Design Center will support missions offering high science return, design to cost, demonstrations of new technology, and rapid development. Its computer-supported environment will foster high-fidelity project life-cycle development and cost estimating.

  7. Officer Leader Development and Education Survey

    DTIC Science & Technology

    2008-05-07

    Center for Army Leadership Technical Report 2008-1 Officer Leader Development & Education Survey Ryan...Riley Josh Hatfield Heidi Keller-Glaze ICF International Jon J. Fallesen Angela I. Karrasch Center for Army Leadership May 7, 2008 Report...2008 2. REPORT TYPE 3. DATES COVERED 4. TITLE AND SUBTITLE Officer Leader Development and Education Survey 5a. CONTRACT NUMBER W91QF406F-0227

  8. Teaching Power Electronics with a Design-Oriented, Project-Based Learning Method at the Technical University of Denmark

    ERIC Educational Resources Information Center

    Zhang, Zhe; Hansen, Claus Thorp; Andersen, Michael A. E.

    2016-01-01

    Power electronics is a fast-developing technology within the electrical engineering field. This paper presents the results and experiences gained from applying design-oriented project-based learning to switch-mode power supply design in a power electronics course at the Technical University of Denmark (DTU). Project-based learning (PBL) is known…

  9. 48 CFR 642.271 - Government Technical Monitor (GTM).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Government Technical... MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Contract Administration Services 642.271 Government Technical Monitor (GTM). (a) Policy. The contracting officer may appoint a Government Technical Monitor (GTM...

  10. FRINGE EFFECTS OF VALUE ENGINEERING. A SURVEY PREPARED BY THE TECHNICAL SUBCOMMITTEE, AOA SPECIAL COMMITTEE ON VALUE ENGINEERING FOR THE OFFICE OF THE ASSISTANT SECRETARY OF DEFENSE (INSTALLATIONS AND LOGISTICS).

    DTIC Science & Technology

    Fringe effects of value engineering. A survey prepared by the technical subcommittee, AOA special committee on value engineering for the office of the assistant secretary of defense (installations and logistics).

  11. AVST Morphing Project Research Summaries in Fiscal Year 2001

    NASA Technical Reports Server (NTRS)

    McGowan, Anna-Maria R.

    2002-01-01

    The Morphing project at the National Aeronautics and Space Agency's Langley Research Center is part of the Aerospace Vehicle Systems Program Office that conducts fundamental research on advanced technologies for future flight vehicles. The objectives of the Morphing project are to develop and assess advanced technologies and integrated component concepts to enable efficient, multi-point adaptability in air and space vehicles. In the context of the project, the word "morphing" is defined as "efficient, multi-point adaptability" and may include micro or macro, structural or fluidic approaches. The current document on the Morphing project is a compilation of research summaries and other information on the project from fiscal year 2001. The focus of this document is to provide a brief overview of the project content, technical results and lessons learned from fiscal year 2001.

  12. 48 CFR 935.010 - Scientific and technical reports.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... information. The DOE Order 241.1B Scientific and Technical Information Management, or its successor version... conveyed in scientific and technical information (STI) shall include an instruction requiring the.... Department of Energy (DOE), Office of Scientific and Technical Information (OSTI), using the DOE Energy Link...

  13. 48 CFR 935.010 - Scientific and technical reports.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... information. The DOE Order 241.1B Scientific and Technical Information Management, or its successor version... conveyed in scientific and technical information (STI) shall include an instruction requiring the.... Department of Energy (DOE), Office of Scientific and Technical Information (OSTI), using the DOE Energy Link...

  14. 48 CFR 935.010 - Scientific and technical reports.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... information. The DOE Order 241.1B Scientific and Technical Information Management, or its successor version... conveyed in scientific and technical information (STI) shall include an instruction requiring the.... Department of Energy (DOE), Office of Scientific and Technical Information (OSTI), using the DOE Energy Link...

  15. 48 CFR 935.010 - Scientific and technical reports.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... information. The DOE Order 241.1B Scientific and Technical Information Management, or its successor version... conveyed in scientific and technical information (STI) shall include an instruction requiring the.... Department of Energy (DOE), Office of Scientific and Technical Information (OSTI), using the DOE Energy Link...

  16. 48 CFR 935.010 - Scientific and technical reports.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... information. The DOE Order 241.1B Scientific and Technical Information Management, or its successor version... conveyed in scientific and technical information (STI) shall include an instruction requiring the.... Department of Energy (DOE), Office of Scientific and Technical Information (OSTI), using the DOE Energy Link...

  17. Office Space: How Will Technology Affect the Education Office Environment?

    ERIC Educational Resources Information Center

    Day, C. William

    2009-01-01

    The office environment 10 years from now will be different from the one today. More office personnel will be organized around processes rather than functions. More work activities will be done by teams rather than individuals, and those teams will change over time, as will the nature of the work projects and the people who constitute the team. The…

  18. Using Model-Based Systems Engineering To Provide Artifacts for NASA Project Life-Cycle and Technical Reviews

    NASA Technical Reports Server (NTRS)

    Parrott, Edith L.; Weiland, Karen J.

    2017-01-01

    The ability of systems engineers to use model-based systems engineering (MBSE) to generate self-consistent, up-to-date systems engineering products for project life-cycle and technical reviews is an important aspect for the continued and accelerated acceptance of MBSE. Currently, many review products are generated using labor-intensive, error-prone approaches based on documents, spreadsheets, and chart sets; a promised benefit of MBSE is that users will experience reductions in inconsistencies and errors. This work examines features of SysML that can be used to generate systems engineering products. Model elements, relationships, tables, and diagrams are identified for a large number of the typical systems engineering artifacts. A SysML system model can contain and generate most systems engineering products to a significant extent and this paper provides a guide on how to use MBSE to generate products for project life-cycle and technical reviews. The use of MBSE can reduce the schedule impact usually experienced for review preparation, as in many cases the review products can be auto-generated directly from the system model. These approaches are useful to systems engineers, project managers, review board members, and other key project stakeholders.

  19. Ohio Legal Office Managment. Technical Competency Profile (TCP).

    ERIC Educational Resources Information Center

    Ray, Gayl M.; Wilson, Nick; Mangini, Rick

    This document, which lists core business and legal office management competencies identified by representatives from education and business and industry throughout Ohio, is intended to assist individuals and organizations in developing college tech prep programs that will prepare students from secondary through post-secondary associate degree…

  20. 48 CFR 2052.211-70 - Preparation of technical reports.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ....211-70 Preparation of technical reports. As prescribed at 2011.104-70(a), the contracting officer... Reports (JAN 1993) All technical reports required by Section C and all Technical Progress Reports required... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Preparation of technical...

  1. 48 CFR 2052.211-70 - Preparation of technical reports.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ....211-70 Preparation of technical reports. As prescribed at 2011.104-70(a), the contracting officer... Reports (JAN 1993) All technical reports required by Section C and all Technical Progress Reports required... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Preparation of technical...

  2. 48 CFR 2052.211-70 - Preparation of technical reports.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ....211-70 Preparation of technical reports. As prescribed at 2011.104-70(a), the contracting officer... Reports (JAN 1993) All technical reports required by Section C and all Technical Progress Reports required... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Preparation of technical...

  3. 48 CFR 2052.211-70 - Preparation of technical reports.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ....211-70 Preparation of technical reports. As prescribed at 2011.104-70(a), the contracting officer... Reports (JAN 1993) All technical reports required by Section C and all Technical Progress Reports required... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Preparation of technical...

  4. 48 CFR 2052.211-70 - Preparation of technical reports.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ....211-70 Preparation of technical reports. As prescribed at 2011.104-70(a), the contracting officer... Reports (JAN 1993) All technical reports required by Section C and all Technical Progress Reports required... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Preparation of technical...

  5. 76 FR 9607 - Notice of Proposed Information Collection for Technical Evaluation Surveys

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-18

    ... Information Collection for Technical Evaluation Surveys AGENCY: Office of Surface Mining Reclamation and... information collection request for its Technical Evaluation customer surveys has been forwarded to the Office of Management and Budget (OMB) for review and comment. The information collection request describes...

  6. Promoting Gender Parity in Basic Education: Lessons from a Technical Cooperation Project in Yemen

    ERIC Educational Resources Information Center

    Yuki, Takako; Mizuno, Keiko; Ogawa, Keiichi; Mihoko, Sakai

    2013-01-01

    Many girls are not sent to school in Yemen, despite basic education being free as well as compulsory for all children aged 6-15. Aiming to improve girls' enrollment by increasing parental and community involvement, the Japan International Cooperation Agency (JICA) offered a technical cooperation project in June 2005 called Broadening Regional…

  7. Department of Education Revives Civil Rights Office

    ERIC Educational Resources Information Center

    Finkel, Ed

    2010-01-01

    This article reports on the mission of the Office for Civil Rights in the U.S. Department of Education to ensure equal access to education through compliance reviews. The Office hopes to use these reviews to provide technical assistance to help districts improve their performance. In late March, the Los Angeles Unified School District became the…

  8. LBNL report of the vetting review of the GRETINA project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robinson, K.E.; Bercovitz, J.H.; Bieser, F.S.

    GRETINA is a gamma-ray detector array capable of reconstructing the energy and spatial positions of gamma-ray interactions within the germanium crystals. It will be used to study the structure and stability of nuclei under various conditions. The new capabilities provided by gamma-ray tracking will give large gains in sensitivity for a large number of experiments, particularly those aimed at nuclei far from beta stability. A proposal for GRETINA was submitted to DOE in June 2003. It presented the scientific case, the readiness of technical development, the design, the suggested management organizations, and a proposed cost and schedule. The GRETINA proposalmore » received its CD0 approval in August 2003. The CD-1 review will be held on December 3 and 4, 2003, and will be handled by the DOE-N. This report presents the charge to the GRETINA vetting review committee, and the findings, comments and recommendations of this committee. The purpose of this project vetting review was to assure that the GRETINA project is on track to provide DOE and the nuclear physics community with the agreed upon deliverables within the agreed upon budget and schedule. The vetting review committee was asked to cover both technical and management aspects of the GRETINA Project. Reviewers offer expert knowledge in relevant areas and provide recommendations and findings to the project's management team. Upon successful completion, the Laboratory's Integrated Project Management Office (IPMO) will recommend signoff of the project to the Laboratory Directorate. The GRETINA vetting review committee was asked to consider all relevant aspects of the project's management, project execution plan (PEP), technical approach and status, cost estimate, resources, schedule and risk and, in doing so, to advise as to whether the GRETINA Project was likely to successfully provide the agreed upon deliverables within the agreed upon budget and schedule. The review committee was asked to identify any project

  9. Course of Study Project. Final Report. Vocational-Technical Education Departmental Report, Vol. 17, No. 18.

    ERIC Educational Resources Information Center

    Pennsylvania State Univ., University Park. Div. of Occupational and Vocational Studies.

    Designed for use by area vocational-technical schools and other vocational programs, this project developed courses of study in eight occupational areas: commercial art, appliance repair, automotive mechanics, graphic arts, building trades maintenance, building construction trades, diesel mechanics, and welding. Course-of-study development…

  10. Project T.E.A.M. (Technical Education Advancement Modules). Introduction to Statistical Process Control.

    ERIC Educational Resources Information Center

    Billings, Paul H.

    This instructional guide, one of a series developed by the Technical Education Advancement Modules (TEAM) project, is a 6-hour introductory module on statistical process control (SPC), designed to develop competencies in the following skill areas: (1) identification of the three classes of SPC use; (2) understanding a process and how it works; (3)…

  11. 20. DETAIL OF OFFICE FURNITURE IN NORTHEAST CORNER OF SECRETARIES' ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. DETAIL OF OFFICE FURNITURE IN NORTHEAST CORNER OF SECRETARIES' OFFICE ALONG NORTH SIDE OF FIRST FLOOR. VIEW TO NORTHEAST. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  12. Involvement of Individuals in the Development of Technical Solutions and Rules of Management for Building Renovation Projects: A Case Study of Latvia

    NASA Astrophysics Data System (ADS)

    Pukite, I.; Grekis, A.; Geipele, I.; Zeltins, N.

    2017-08-01

    In March 2016, the Latvian government approved a new support program for increasing energy efficiency in residential apartment buildings. For the support of renovation of apartment buildings in the period from 2016 to 2023, 166 470 588 EUR will be available. Different persons, such as energy auditors, designers, architects, project managers and builders, will be involved in the process of planning, development and implementation of building renovation. At the development stage of the building renovation project, special attention should be devoted to the first stage - energy audit and technical project development. The problem arises due to the fact that each of these individuals, during the development of technical building documentation, does not work as a completely unified system. The implementation of construction project planning and organisational management system is one of the most important factors to guarantee that the quality of building renovation project is ensured in accordance with the laws and regulatory standards. The paper studies mutual cooperation, professionalism and the role of information feedback of personnel involved in the planning stage of building renovation, which is an essential prerequisite for the renovation process in order to achieve high quality of work and reduce the energy performance indicator. The present research includes the analysis of different technical solutions and their impact on energy efficiency. Mutual harmonisation of technical specifications is also investigated.

  13. Using Model-Based Systems Engineering to Provide Artifacts for NASA Project Life-cycle and Technical Reviews

    NASA Technical Reports Server (NTRS)

    Parrott, Edith L.; Weiland, Karen J.

    2017-01-01

    This paper is for the AIAA Space Conference. The ability of systems engineers to use model-based systems engineering (MBSE) to generate self-consistent, up-to-date systems engineering products for project life-cycle and technical reviews is an important aspect for the continued and accelerated acceptance of MBSE. Currently, many review products are generated using labor-intensive, error-prone approaches based on documents, spreadsheets, and chart sets; a promised benefit of MBSE is that users will experience reductions in inconsistencies and errors. This work examines features of SysML that can be used to generate systems engineering products. Model elements, relationships, tables, and diagrams are identified for a large number of the typical systems engineering artifacts. A SysML system model can contain and generate most systems engineering products to a significant extent and this paper provides a guide on how to use MBSE to generate products for project life-cycle and technical reviews. The use of MBSE can reduce the schedule impact usually experienced for review preparation, as in many cases the review products can be auto-generated directly from the system model. These approaches are useful to systems engineers, project managers, review board members, and other key project stakeholders.

  14. Office of Legacy Management Decision Tree for Solar Photovoltaic Projects - 13317

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Elmer, John; Butherus, Michael; Barr, Deborah L.

    2013-07-01

    To support consideration of renewable energy power development as a land reuse option, the DOE Office of Legacy Management (LM) and the National Renewable Energy Laboratory (NREL) established a partnership to conduct an assessment of wind and solar renewable energy resources on LM lands. From a solar capacity perspective, the larger sites in the western United States present opportunities for constructing solar photovoltaic (PV) projects. A detailed analysis and preliminary plan was developed for three large sites in New Mexico, assessing the costs, the conceptual layout of a PV system, and the electric utility interconnection process. As a result ofmore » the study, a 1,214-hectare (3,000-acre) site near Grants, New Mexico, was chosen for further study. The state incentives, utility connection process, and transmission line capacity were key factors in assessing the feasibility of the project. LM's Durango, Colorado, Disposal Site was also chosen for consideration because the uranium mill tailings disposal cell is on a hillside facing south, transmission lines cross the property, and the community was very supportive of the project. LM worked with the regulators to demonstrate that the disposal cell's long-term performance would not be impacted by the installation of a PV solar system. A number of LM-unique issues were resolved in making the site available for a private party to lease a portion of the site for a solar PV project. A lease was awarded in September 2012. Using a solar decision tree that was developed and launched by the EPA and NREL, LM has modified and expanded the decision tree structure to address the unique aspects and challenges faced by LM on its multiple sites. The LM solar decision tree covers factors such as land ownership, usable acreage, financial viability of the project, stakeholder involvement, and transmission line capacity. As additional sites are transferred to LM in the future, the decision tree will assist in determining whether

  15. Joint Integration Office Independent Review Committee annual report, 1985

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    Comprised of seven persons with extensive experience in the issues of nuclear waste, the Independent Review Committee (IRC) provides independent and objective review of Defense Transuranic Waste Program (DTWP) activities managed by the Joint Integration Office (JIO), formerly the Defense Transuranic Waste Lead Organization (TLO). The Committee is ensured a broad, interdisciplinary perspective since its membership includes representatives from the fields of nuclear engineering, nuclear waste transportation, industrial quality control, systems and environmental engineering and state and local government. The scope of IRC activities includes overall review of specific TLO plans, projects and activities, and technical review of particular researchmore » and development projects. The Committee makes specific suggestions and recommendations based upon expertise in the field of TRU Waste Management. The IRC operates as a consulting group, under an independent charter providing objective review of program activities. This report summarizes the 12 major topics reviewed by the committee during 1985.« less

  16. Aviation Trends Related to Atmospheric Environment Safety Technologies Project Technical Challenges

    NASA Technical Reports Server (NTRS)

    Reveley, Mary S.; Withrow, Colleen A.; Barr, Lawrence C.; Evans, Joni K.; Leone, Karen M.; Jones, Sharon M.

    2014-01-01

    Current and future aviation safety trends related to the National Aeronautics and Space Administration's Atmospheric Environment Safety Technologies Project's three technical challenges (engine icing characterization and simulation capability; airframe icing simulation and engineering tool capability; and atmospheric hazard sensing and mitigation technology capability) were assessed by examining the National Transportation Safety Board (NTSB) accident database (1989 to 2008), incidents from the Federal Aviation Administration (FAA) accident/incident database (1989 to 2006), and literature from various industry and government sources. The accident and incident data were examined for events involving fixed-wing airplanes operating under Federal Aviation Regulation (FAR) Parts 121, 135, and 91 for atmospheric conditions related to airframe icing, ice-crystal engine icing, turbulence, clear air turbulence, wake vortex, lightning, and low visibility (fog, low ceiling, clouds, precipitation, and low lighting). Five future aviation safety risk areas associated with the three AEST technical challenges were identified after an exhaustive survey of a variety of sources and include: approach and landing accident reduction, icing/ice detection, loss of control in flight, super density operations, and runway safety.

  17. The Development of a Project-Based Collaborative Technical Writing Model Founded on Learner Feedback in a Tertiary Aeronautical Engineering Program

    ERIC Educational Resources Information Center

    Tatzl, Dietmar; Hassler, Wolfgang; Messnarz, Bernd; Fluhr, Holger

    2012-01-01

    The present article describes and evaluates collaborative interdisciplinary group projects initiated by content lecturers and an English-as-a-Foreign-Language (EFL) instructor for the purpose of teaching technical writing skills in an aeronautical engineering degree program. The proposed technical writing model is assessed against the results of a…

  18. DOE-GTO Low Temperture Projects Evaluation and Lessons Learned

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Williams, Tom; Snyder, Neil; Gosnold, Will

    2017-05-01

    This paper discusses opportunities and challenges related to the technical and economic feasibility of developing power generation from geothermal resources at temperatures of 150 degrees C and lower. Insights from projects funded by the U.S. Department of Energy (DOE), Geothermal Technologies Office inform these discussions and provide the basis for some lessons learned to help guide decisions by DOE and the industry in further developing this resource. The technical basis for low-temperature geothermal energy is well established and the systems can be economic today in certain situations. However, these applications are far from a 'plug and play' product; successful developmentmore » today requires a good knowledge of geothermal system design and operation.« less

  19. Using Model-Based System Engineering to Provide Artifacts for NASA Project Life-Cycle and Technical Reviews Presentation

    NASA Technical Reports Server (NTRS)

    Parrott, Edith L.; Weiland, Karen J.

    2017-01-01

    This is the presentation for the AIAA Space conference in September 2017. It highlights key information from Using Model-Based Systems Engineering to Provide Artifacts for NASA Project Life-cycle and Technical Reviews paper.

  20. Constellation Program Mission Operations Project Office Status and Support Philosophy

    NASA Technical Reports Server (NTRS)

    Smith, Ernest; Webb, Dennis

    2007-01-01

    The Constellation Program Mission Operations Project Office (CxP MOP) at Johnson Space Center in Houston Texas is preparing to support the CxP mission operations objectives for the CEV/Orion flights, the Lunar Lander, and and Lunar surface operations. Initially the CEV will provide access to the International Space Station, then progress to the Lunar missions. Initial CEV mission operations support will be conceptually similar to the Apollo missions, and we have set a challenge to support the CEV mission with 50% of the mission operations support currently required for Shuttle missions. Therefore, we are assessing more efficient way to organize the support and new technologies which will enhance our operations support. This paper will address the status of our preparation for these CxP missions, our philosophical approach to CxP operations support, and some of the technologies we are assessing to streamline our mission operations infrastructure.

  1. Building Geographic Information System Capacity in Local Health Departments: Lessons From a North Carolina Project

    PubMed Central

    Miranda, Marie Lynn; Silva, Jennifer M.; Overstreet Galeano, M. Alicia; Brown, Jeffrey P.; Campbell, Douglas S.; Coley, Evelyn; Cowan, Christopher S.; Harvell, Dianne; Lassiter, Jenny; Parks, Jerry L.; Sandelé, Wanda

    2005-01-01

    State government, university, and local health department (LHD) partners collaborated to build the geographic information system (GIS) capacity of 5 LHDs in North Carolina. Project elements included procuring hardware and software, conducting individualized and group training, developing data layers, guiding the project development process, coordinating participation in technical conferences, providing ongoing project consultation, and evaluating project milestones. The project provided health department personnel with the skills and resources required to use sophisticated information management systems, particularly those that address spatial dimensions of public health practice. This capacity-building project helped LHDs incorporate GIS technology into daily operations, resulting in improved time and cost efficiency. Keys to success included (1) methods training rooted in problems specific to the LHD, (2) required project identification by LHD staff with associated timelines for development, (3) ongoing technical support as staff returned to home offices after training, (4) subgrants to LHDs to ease hardware and software resource constraints, (5) networks of relationships among LHDs and other professional GIS users, and (6) senior LHD leadership who supported the professional development activities being undertaken by staff. PMID:16257950

  2. Geothermal Technologies Office 2012 Peer Review Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    none,

    2013-04-01

    On May 7-10, 2012, the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, Geothermal Technologies Office conducted its annual program peer review in Westminster, CO. In accordance with the EERE Peer Review Guide, the review provides an independent, expert evaluation of the strategic goals and direction of the office and is a forum for feedback and recommendations on future office planning. The purpose of the review was to evaluate DOE-funded projects for their contribution to the mission and goals of the office and to assess progress made against stated objectives. Project scoring results, expert reviewer comments, andmore » key findings and recommendations are included in this report.« less

  3. NASA/DOD Aerospace Knowledge Diffusion Research Project. Paper 36: Technical uncertainty as a correlate of information use by US industry-affiliated aerospace engineers and scientists

    NASA Technical Reports Server (NTRS)

    Pinelli, Thomas E.; Glassman, Nanci A.; Affelder, Linda O.; Hecht, Laura M.; Kennedy, John M.; Barclay, Rebecca O.

    1994-01-01

    This paper reports the results of an exploratory study that investigated the influence of technical uncertainty on the use of information and information sources by U.S. industry-affiliated aerospace engineers and scientists in completing or solving a project, task, or problem. Data were collected through a self-administered questionnaire. Survey participants were U.S. aerospace engineers and scientists whose names appeared on the Society of Automotive Engineers (SAE) mailing list. The results support the findings of previous research and the following study assumptions. Information and information-source use differ for projects, problems, and tasks with high and low technical uncertainty. As technical uncertainty increases, information-source use changes from internal to external and from informal to formal sources. As technical uncertainty increases, so too does the use of federally funded aerospace research and development (R&D). The use of formal information sources to learn about federally funded aerospace R&D differs for projects, problems, and tasks with high and low technical uncertainty.

  4. 25 CFR 1200.42 - Who can provide technical assistance?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Who can provide technical assistance? 1200.42 Section 1200.42 Indians OFFICE OF THE SPECIAL TRUSTEE FOR AMERICAN INDIANS, DEPARTMENT OF THE INTERIOR AMERICAN INDIAN TRUST FUND MANAGEMENT REFORM ACT Technical Assistance § 1200.42 Who can provide technical...

  5. Prioritizing sewer rehabilitation projects using AHP-PROMETHEE II ranking method.

    PubMed

    Kessili, Abdelhak; Benmamar, Saadia

    2016-01-01

    The aim of this paper is to develop a methodology for the prioritization of sewer rehabilitation projects for Algiers (Algeria) sewer networks to support the National Sanitation Office in its challenge to make decisions on prioritization of sewer rehabilitation projects. The methodology applies multiple-criteria decision making. The study includes 47 projects (collectors) and 12 criteria to evaluate them. These criteria represent the different issues considered in the prioritization of the projects, which are structural, hydraulic, environmental, financial, social and technical. The analytic hierarchy process (AHP) is used to determine weights of the criteria and the Preference Ranking Organization Method for Enrichment Evaluations (PROMETHEE II) method is used to obtain the final ranking of the projects. The model was verified using the sewer data of Algiers. The results have shown that the method can be used for prioritizing sewer rehabilitation projects.

  6. Change of the layout of an office of a metallurgical company: simple projects, big solutions.

    PubMed

    Duarte, Luiz Carlos da Silva; Eckhardt, Moacir; da Motta, Giordano Paulo

    2012-01-01

    The posture, a good organization and the proper layout of the environment and workplaces have a positive influence on the income of an employee. To develop the work it is used a methodology that addressed the study phases of the theory involving the subject, description of the current situation, preparation of conceptions, choice of design, implementation and reporting of results. Through the project of "Change of the layout of an office of a metallurgical company" there was an intervention in these reported aspects providing improvements in the office, regarding ergonomic, layout, workplace and lighting issues, bringing welfare to the official, with the intent to improve its performance within the company and facilitating its actions, as the company's customer service. The results provided improvements in layout, in the workplace and especially in comfort for the human resources that perform their activities.

  7. About STIP | OSTI, US Dept of Energy Office of Scientific and Technical

    Science.gov Websites

    Information Skip to main content Scientific and Technical Information Program The home of the U.S. Department of Energy's Scientific and Technical Information Program (STIP) Here you will find through scientific and technical information (STI), a key outcome of DOE R&D and other activities

  8. Reducing RN Vacancy Rate: A Nursing Recruitment Office Process Improvement Project.

    PubMed

    Hisgen, Stephanie A; Page, Nancy E; Thornlow, Deirdre K; Merwin, Elizabeth I

    2018-06-01

    The aim of this study was to reduce the RN vacancy rate at an academic medical center by improving the hiring process in the Nursing Recruitment Office. Inability to fill RN positions can lead to higher vacancy rates and negatively impact staff and patient satisfaction, quality outcomes, and the organization's bottom line. The Model for Improvement was used to design and implement a process improvement project to improve the hiring process from time of interview through the position being filled. Number of days to interview and check references decreased significantly, but no change in overall time to hire and time to fill positions was noted. RN vacancy rate also decreased significantly. Nurse manager satisfaction with the hiring process increased significantly. Redesigning the recruitment process supported operational efficiencies of the organization related to RN recruitment.

  9. ARJIS satellite demonstration project

    NASA Astrophysics Data System (ADS)

    Severance, Steve; Williams, Carl

    2005-06-01

    In 2003, the California Space Authority (CSA) was provided funding by the U. S. Congress through the Defense Appropriations Act to develop a project that would demonstrate the U.S. space enterprise capability that would contribute to the effectiveness of those engaged in Homeland Security. The project was given broad latitude in selecting the area of Homeland Security to be addressed and the nature of the space technology to be applied. CSA became aware of a nascent law enforcement data-sharing project in the San Diego region known as the Automated Regional Justice Information System (ARJIS). First developed by the police departments in San Diego, ARJIS is an innovative system that shares criminal justice information among 50 federal, state, and local agencies. ARJIS was completing a pilot project that enabled officers to receive information on handheld computers, which was transmitted wirelessly through cellular networks. The accessed information came from several databases that collectively contained the entire region's crime and arrest reports, traffic citations, and incidents, as well as state and county wants and warrants. The fundamental limitations that plague all cellular-based devices caught CSA's attention and resulted in a cooperative effort to harden the communications link between the patrol officer and critical data. The principal goal of the SATCOM development task was to create a proof-of-concept application that would use SATCOM links to augment the current ARJIS handheld wireless (cellular) capability. The successful technical demonstration and the positive support for satellite communications from the law enforcement community showed that this project filled a need-both for improved information sharing and for highly reliable communications systems.

  10. Use Management Techniques in Office Practice

    ERIC Educational Resources Information Center

    Holehan, E. Lee

    1977-01-01

    Notes that authenticity can be added to student work projects in an office practice class by having the teacher assume the role of the office manager or supervisor and putting office management techniques into practice. Ways in which such techniques may be infused into classes are examined. (TA)

  11. Engineering Technical Support Center (ETSC)

    EPA Pesticide Factsheets

    ETSC is EPA’s technical support and resource centers responsible for providing specialized scientific and engineering support to decision-makers in the Agency’s ten regional offices, states, communities, and local businesses.

  12. 78 FR 40459 - Applications for New Awards; Technical Assistance and Dissemination To Improve Services and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-05

    ... DEPARTMENT OF EDUCATION Applications for New Awards; Technical Assistance and Dissemination To... AGENCY: Office of Special Education and Rehabilitative Services, Office of Elementary and Secondary Education, Department of Education. ACTION: Notice. Overview Information Technical Assistance and...

  13. 1982 Texas Competency Validation Project for Auto Mechanics, Diesel Mechanics, Office Occupations, Printshop Trades, and Welding. Final Report.

    ERIC Educational Resources Information Center

    Rogers, Sandra K.; Dahlberg, Maurine F.

    This report documents a statewide competency validation project to provide current information about job skills considered "important to know" by Texas industrial experts in the areas of auto mechanics, diesel mechanics, office occupations, print shop trades, and welding. Section 1 describes the steps used to conduct the study and…

  14. Office Occupations Curriculum Course Guide. Postsecondary. 1984 Revision. Bulletin 1665.

    ERIC Educational Resources Information Center

    Louisiana State Dept. of Education, Baton Rouge. Div. of Vocational Education.

    This curriculum course guide lists requirements for the various courses that could be offered in an office occupations program in the postsecondary vocational-technical schools of Louisiana. Descriptions are provided for these curricula: account clerk, administrative/office assistant, secretary/stenographer (including three specialized areas:…

  15. Analysis of Florida Department of Transportation transit corridor program/projects : technical memorandum number one - review and summary of transit corridor plans

    DOT National Transportation Integrated Search

    2001-05-01

    The purpose of this project was to undertake a consolidated comprehensive review of the Florida Department of Transportation Transit Corridor Program. Technical Memorandum Number One provides a summary of all transit corridor projects either under wa...

  16. Sharing success: State energy program special projects results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    2000-03-15

    The State Energy Program was created in 1996 by an act of Congress through the consolidation of the State Energy Conservation Program (SECP) and the Institutional Conservation Program (ICP). Formerly, SECP provided funding for a variety of energy efficiency and renewable energy projects, and ICP assisted schools and hospitals with technical analysis and installation of energy conservation measures. Through these programs, more than 8,000 specific State conservation projects have been implemented since 1983 and more than 69,000 buildings have been made more energy efficient since 1979. The Department of Energy's Office of Energy Efficiency and Renewable Energy recognized the valuemore » of delivering programs through the States and created Special Projects in 1996. This report is an overview of State Energy Program operations, strategic focus, activities and accomplishments.« less

  17. A NASA Applied Spaceflight Environments Office Concept

    NASA Technical Reports Server (NTRS)

    Spann, James F.; Edwards, David L.; Burns, Howard D.; Xapsos, Mike

    2011-01-01

    The National Aeronautics and Space Administration (NASA) is launching a bold and ambitious new space initiative. A significant part of this new initiative includes exploration of new worlds, the development of more innovative technologies, and expansion our presence in the solar system. A common theme to this initiative is the exploration of space beyond Low Earth Orbit (LEO). As currently organized, NASA does not have an Agency-level office that provides coordination of space environment research and development. This has contributed to the formation of a gap between spaceflight environments knowledge and the application of this knowledge for multi-program use and for use outside NASA. This paper outlines a concept to establish a NASA-level Applied Spaceflight Environments (ASE) office that will provide coordination and funding for sustained multi-program support in three technical areas that have demonstrated these needs through customer requests. These technical areas are natural environments characterization and modeling, materials and systems analysis and test, and operational space environments modeling. Additionally the ASE office will serve as an entry point of contact for external users who wish to take advantage of data and assets associated with space environments, including space weather. This paper will establish the need for the ASE, discuss a concept for organizational structure and outline the scope in the three technical areas.

  18. 28 CFR 0.18a - Office of Small and Disadvantaged Business Utilization.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... described in paragraph (a) of this section; (d) Provide resource information and technical training and... functions; (e) Assign a small business technical adviser to any Department offices to which the Small...

  19. The Independent Technical Analysis Process

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Duberstein, Corey A.; Ham, Kenneth D.; Dauble, Dennis D.

    2007-04-13

    The Bonneville Power Administration (BPA) contracted with the Pacific Northwest National Laboratory (PNNL) to provide technical analytical support for system-wide fish passage information (BPA Project No. 2006-010-00). The goal of this project was to produce rigorous technical analysis products using independent analysts and anonymous peer reviewers. In the past, regional parties have interacted with a single entity, the Fish Passage Center to access the data, analyses, and coordination related to fish passage. This project provided an independent technical source for non-routine fish passage analyses while allowing routine support functions to be performed by other well-qualified entities.

  20. NASA Technical Standards Program

    NASA Technical Reports Server (NTRS)

    Gill, Paul S.; Vaughan, William W.; Parker, Nelson C. (Technical Monitor)

    2002-01-01

    The NASA Technical Standards Program was officially established in 1997 as result of a directive issued by the Administrator. It is responsible for Agency wide technical standards development, adoption (endorsement), and conversion of Center-unique standards for Agency wide use. One major element of the Program is the review of NSA technical standards products and replacement with non-Government Voluntary Consensus Standards in accordance with directions issued by the Office of Management and Budget. As part of the Program's function, it developed a NASA Integrated Technical Standards Initiative that consists of and Agency wide full-text system, standards update notification system, and lessons learned-standards integration system. The Program maintains a 'one stop-shop' Website for technical standards ad related information on aerospace materials, etc. This paper provides information on the development, current status, and plans for the NAS Technical Standards Program along with metrics on the utility of the products provided to both users within the nasa.gov Domain and the Public Domain.

  1. NASA Technical Standards Program

    NASA Technical Reports Server (NTRS)

    Gill, Paul S.; Vaughan, WIlliam W.

    2003-01-01

    The NASA Technical Standards Program was officially established in 1997 as result of a directive issued by the Administrator. It is responsible for Agency wide technical standards development, adoption (endorsement), and conversion of Center-unique standards for Agency wide use. One major element of the Program is the review of NSA technical standards products and replacement with non-Government Voluntary Consensus Standards in accordance with directions issued by the Office of Management and Budget. As part of the Program s function, it developed a NASA Integrated Technical Standards Initiative that consists of and Agency wide full-text system, standards update notification system, and lessons learned - standards integration system. The Program maintains a "one stop-shop" Website for technical standards ad related information on aerospace materials, etc. This paper provides information on the development, current status, and plans for the NAS Technical Standards Program along with metrics on the utility of the products provided to both users within the nasa.gov Domain and the Public Domain.

  2. [Quality of life and well-being in a housing project in Berlin--experiences gained in cooperation between a community health promotion office and a university-based public health project].

    PubMed

    Gottwald, S; Voigt, T; Luber, E

    1999-05-01

    The realization of a community-based health promotion within the framework of a cooperation between a public health office and a university-based PH project is described and discussed. First of all, the project, the cooperating partners and the common aims are described. We will then deal with telephone survey as the method used, and present the results. In a third step the methods and results of the "future workshops" are discussed. Finally there is a critical reflection on the course of the project, the limiting factors of the actions and consideration of further developments. The project dealt with was a cooperation of a community public health agency (Plan- und Leitstelle) in the district of Berlin-Wilmersdorf and the research project A8 "Cooperative project development for communal health promotion" of the Berlin Centre for Public Health at the Technical University Berlin. Starting point was the agreement for those politically responsible of the district that the living quarter "Schlangenbader Strasse" was a focus of social problems. The quarter had been built in 1980 above a highway with 1800 apartments for 4000 people. Health promotion was defined as a concern of a wide range of sectors within the community. Mutual rights and responsibilities of the cooperating partners were laid down in a contract. The Plan- und Leitstelle tried to gain experience with the definition of health promotion the university partners stood for. This introduces a notion of health beyond bio-medical understanding and deals with the connection of quality of life, well-being and the environment in the residential area. Thus health- or sickness-related variables were not specifically asked for. One result is that actors within the given framework are reluctant to permit operationalisation of this concept. The telephone survey reached 324 household within 10 working days. 68p.c. of the interviewed were pleased with the comfort of the apartments, 37p.c. enjoyed the peace and quiet and 35

  3. 39 CFR 2.1 - Office of the Board of Governors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Office of the Board of Governors. 2.1 Section 2.1 Postal Service UNITED STATES POSTAL SERVICE THE BOARD OF GOVERNORS OF THE U.S. POSTAL SERVICE GENERAL AND TECHNICAL PROVISIONS (ARTICLE II) § 2.1 Office of the Board of Governors. There shall be located in Washington, DC an Office of the Board of...

  4. TARPS: A Prototype Expert System for Training and Administration of Reserves (TAR) Officer Placement

    DTIC Science & Technology

    1991-09-01

    OFFICER AQD=DC4 OR OFFICERAQD=DB6 OR OFFICER AQD=DA7 OR OFFICER--AQD-DA2 THEN BILLET AQD= ECK RULE 61 IF OFFICER DESIGNATOR=1317 AND OFFICER AQD=DB4 OR...Decision Support and Expert Systems, Macmillan Publishing Company, 1990. 71 INITIAL DISTRIBUTION LIST 1. Defense Technical Information Center 2 Cameron

  5. Bibliography of Technical Publications and Papers, October 1978 - September 1979

    DTIC Science & Technology

    1979-11-01

    overnutrition. Symposium on Psychosocial Factors in Nutritional Problems, llth International Congress of Nutrition, Rio de Janeiro , Brazil, September...VBIOGRAPHY OF-TZHNICAL BLICATIONS AND An T7 Octber118 -Seu~imb~ 199k6. PERFORMNING OR0. REPORT NUMBER 7. AUTMOR( e ) S. CONTRACT -OR G ANT HNDMER~a) 9...Officer Advanced Class 79-2, US Army Quartermaster School, Fort Lee, VA, 14 August 1979. 6 OFFICE OF TECHNICAL DIRECTOR Technical Papers 12. ROSS, E . W

  6. NASA/DOD Aerospace Knowledge Diffusion Research Project. Report 15: Technical uncertainty and project complexity as correlates of information use by US industry-affiliated aerospace engineers and scientists: Results of an exploratory investigation

    NASA Technical Reports Server (NTRS)

    Pinelli, Thomas E.; Glassman, Nanci A.; Affelder, Linda O.; Hecht, Laura M.; Kennedy, John M.; Barclay, Rebecca O.

    1993-01-01

    An exploratory study was conducted that investigated the influence of technical uncertainty and project complexity on information use by U.S. industry-affiliated aerospace engineers and scientists. The study utilized survey research in the form of a self-administered mail questionnaire. U.S. aerospace engineers and scientists on the Society of Automotive Engineers (SAE) mailing list served as the study population. The adjusted response rate was 67 percent. The survey instrument is appendix C to this report. Statistically significant relationships were found to exist between technical uncertainty, project complexity, and information use. Statistically significant relationships were found to exist between technical uncertainty, project complexity, and the use of federally funded aerospace R&D. The results of this investigation are relevant to researchers investigating information-seeking behavior of aerospace engineers. They are also relevant to R&D managers and policy planners concerned with transferring the results of federally funded aerospace R&D to the U.S. aerospace industry.

  7. Challenge Study: A Project-Based Learning on a Wireless Communication System at Technical High School

    ERIC Educational Resources Information Center

    Terasawa, Ikuo

    2016-01-01

    The challenge study is a project based learning curriculum at Technical High School aimed at the construction of a wireless communication system. The first period was engineering issues in the construction of an artificial satellite and the second period was a positional locating system based on the general purpose wire-less device--ZigBee device.…

  8. LANDFILL GAS ENERGY UTILIZATION EXPERIENCE: DISCUSSION OF TECHNICAL AND NON-TECHNICAL ISSUES, SOLUTIONS, AND TRENDS

    EPA Science Inventory

    The report discusses technical and non-technical considerations associated with the development and operation of landfill gas to energy projects. Much of the report is based on interviews and site visits with the major developers and operators of the more than 110 projects in the...

  9. Advanced Development Projects for Constellation From The Next Generation Launch Technology Program Elements

    NASA Technical Reports Server (NTRS)

    Huebner, Lawrence D.; Saiyed, Naseem H.; Swith, Marion Shayne

    2005-01-01

    When United States President George W. Bush announced the Vision for Space Exploration in January 2004, twelve propulsion and launch system projects were being pursued in the Next Generation Launch Technology (NGLT) Program. These projects underwent a review for near-term relevance to the Vision. Subsequently, five projects were chosen as advanced development projects by NASA s Exploration Systems Mission Directorate (ESMD). These five projects were Auxiliary Propulsion, Integrated Powerhead Demonstrator, Propulsion Technology and Integration, Vehicle Subsystems, and Constellation University Institutes. Recently, an NGLT effort in Vehicle Structures was identified as a gap technology that was executed via the Advanced Development Projects Office within ESMD. For all of these advanced development projects, there is an emphasis on producing specific, near-term technical deliverables related to space transportation that constitute a subset of the promised NGLT capabilities. The purpose of this paper is to provide a brief description of the relevancy review process and provide a status of the aforementioned projects. For each project, the background, objectives, significant technical accomplishments, and future plans will be discussed. In contrast to many of the current ESMD activities, these areas are providing hardware and testing to further develop relevant technologies in support of the Vision for Space Exploration.

  10. Engineering Technical Review Planning Briefing

    NASA Technical Reports Server (NTRS)

    Gardner, Terrie

    2012-01-01

    The general topics covered in the engineering technical planning briefing are 1) overviews of NASA, Marshall Space Flight Center (MSFC), and Engineering, 2) the NASA Systems Engineering(SE) Engine and its implementation , 3) the NASA Project Life Cycle, 4) MSFC Technical Management Branch Services in relation to the SE Engine and the Project Life Cycle , 5) Technical Reviews, 6) NASA Human Factor Design Guidance , and 7) the MSFC Human Factors Team. The engineering technical review portion of the presentation is the primary focus of the overall presentation and will address the definition of a design review, execution guidance, the essential stages of a technical review, and the overall review planning life cycle. Examples of a technical review plan content, review approaches, review schedules, and the review process will be provided and discussed. The human factors portion of the presentation will focus on the NASA guidance for human factors. Human factors definition, categories, design guidance, and human factor specialist roles will be addressed. In addition, the NASA Systems Engineering Engine description, definition, and application will be reviewed as background leading into the NASA Project Life Cycle Overview and technical review planning discussion.

  11. SUPERFUND TECHNICAL SUPPORT

    EPA Science Inventory

    Under this task, technical support is provided to Regional Remedial Project Managers (RPMs)/On-Scene Coordinators (OSCs) at Superfund, RCRA, and Brownfields sites contaminated with hazardous materials by the Technical Support Center (TSC) for Monitoring and Site Characterization....

  12. Junior Officer Retention: Another Perspective.

    DTIC Science & Technology

    1980-01-01

    actually be crucial to retention.25 As Weber has pointed out, playing politics is a critical dimension of any career success formula.26 In this study, we...Issues and Wife Styles Across Naval Officer Career Stages: Their Implications For Career Success ," Technical Report No. 2, Naval Postgraduate School, July

  13. Final report of the decontamination and decommissioning of the exterior land areas at the Grand Junction Projects Office facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1995-09-01

    The US Department of Energy (DOE) Grand Junction Projects Office (GJPO) facility occupies approximately 56.4 acres (22.8 hectares) along the Gunnison River near Grand Junction, Colorado. The site was contaminated with uranium ore and mill tailings during uranium-refining activities conducted by the Manhattan Engineer District and during pilot-milling experiments conducted for the US Atomic Energy Commission`s (AEC`s) domestic uranium procurement program. The GJPO facility was the collection and assay point for AEC uranium and vanadium oxide purchases until the early 1970s. The DOE Decontamination and Decommissioning Program sponsored the Grand Junction Projects Office Remedial Action Project (GJPORAP) to remediate themore » facility lands, site improvements, and the underlying aquifer. The site contractor, Rust Geotech, was the Remedial Action Contractor for GJPORAP. The exterior land areas of the facility assessed as contaminated have been remediated in accordance with identified standards and can be released for unrestricted use. Restoration of the aquifer will be accomplished through the natural flushing action of the aquifer during the next 50 to 80 years. The remediation of the DOE-GJPO facility buildings is ongoing and will be described in a separate report.« less

  14. Technical Review of the Domestic Nuclear Detection Office Transformational and Applied Research Directorate’s Research and Development Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lavietes, Anthony; Trebes, James; Borchers, Robert

    2013-01-01

    At the request of the Domestic Nuclear Detection Office (DNDO), a Review Committee comprised of representatives from the American Physical Society (APS) Panel on Public Affairs (POPA) and the Institute of Electrical and Electronics Engineers (IEEE) Nuclear and Plasma Sciences Society (NPSS) performed a technical review of the DNDO Transformational and Applied Research Directorate (TARD) research and development program. TARD’s principal objective is to address gaps in the Global Nuclear Detection Architecture (GNDA) through improvements in the performance, cost, and operational burden of detectors and systems. The charge to the Review Committee was to investigate the existing TARD research andmore » development plan and portfolio, recommend changes to the existing plan, and recommend possible new R&D areas and opportunities. The Review Committee has several recommendations.« less

  15. Technical data for concentrated solar power plants in operation, under construction and in project.

    PubMed

    Pelay, Ugo; Luo, Lingai; Fan, Yilin; Stitou, Driss; Rood, Mark

    2017-08-01

    This article presents technical data for concentrated solar power (CSP) plants in operation, under construction and in project all over the world in the form of tables. These tables provide information about plants (e.g., name of the CSP plant, country of construction, owner of the plant, aim of the plant) and their technical characteristics (e.g., CSP technology, solar power, area of the plant, presence and type of hybridization system, electricity cost, presence and type of TES, power cycle fluid, heat transfer fluid, operating temperature, operating pressure, type of turbine, type and duration of storage, etc.). Further interpretation of the data and discussions on the current state-of-the-art and future trends of CSP can be found in the associated research article (Pelay et al., 2017) [1].

  16. Annotated directory of US Government information system projects of potential interest to NASA/SSPO

    NASA Technical Reports Server (NTRS)

    Legrand, Sue

    1988-01-01

    The purpose of this research activity was to develop a list for NASA of major U.S. government information systems contacts who are able to cooperate with NASA on technical interchange. The list contains the names of appropriate managers involved in major information system projects, U.S. government office officials, and their hierarchy up to the highest officials whose major responsibilities include government information systems development.

  17. 39 CFR 3002.12 - Office of Rates, Analysis, and Planning.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 39 Postal Service 1 2011-07-01 2011-07-01 false Office of Rates, Analysis, and Planning. 3002.12... Rates, Analysis, and Planning. (a) The Office of Rates, Analysis, and Planning is responsible for technical (as opposed to legal) analysis and the formulation of policy recommendations for the Commission...

  18. 39 CFR 3002.12 - Office of Rates, Analysis, and Planning.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 39 Postal Service 1 2012-07-01 2012-07-01 false Office of Rates, Analysis, and Planning. 3002.12... Rates, Analysis, and Planning. (a) The Office of Rates, Analysis, and Planning is responsible for technical (as opposed to legal) analysis and the formulation of policy recommendations for the Commission...

  19. 49 CFR 20.300 - Professional and technical services.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Professional and technical services. 20.300 Section 20.300 Transportation Office of the Secretary of Transportation NEW RESTRICTIONS ON LOBBYING Activities by Other Than Own Employees § 20.300 Professional and technical services. (a) The prohibition on...

  20. 49 CFR 20.300 - Professional and technical services.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 1 2012-10-01 2012-10-01 false Professional and technical services. 20.300 Section 20.300 Transportation Office of the Secretary of Transportation NEW RESTRICTIONS ON LOBBYING Activities by Other Than Own Employees § 20.300 Professional and technical services. (a) The prohibition on...

  1. Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Glasser, Alan H.

    Final technical report on DE-SC0016106. This is the final technical report for a portion of the multi-institutional CEMM project. This report is centered around 3 publications and a seminar presentation, which have been submitted to E-Link.

  2. 78 FR 51210 - Agency Information Collection Activities; Proposed Collection; Comments Requested: Office for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-20

    ... Technical Assistance Center (OVC TTAC) Online Trainings Package ACTION: 30-day notice. The Department of...: The Office for Victims of Crime Training and Technical Assistance Center (OVC TTAC) Online Trainings... online training and technical assistance and, in some cases, to online instructors or participants...

  3. Brownfields Allen-Morrison Project: Technical Memorandum on Creating Inventory of Materials that can be Reused or Recycled through Deconstruction

    EPA Pesticide Factsheets

    This technical memorandum presents sustainability pilot activities, a summary of inventory results, and other observations and recommendations for sustainable redevelopment identified during the pilot activities at the brownfields projects.

  4. CONTEMPORARY SITUATIONS AND PROBLEMS OF ROAD/BRIDGE MAINTENANCE TECHNICAL COOPERATION PROJECTS

    NASA Astrophysics Data System (ADS)

    Nishimiya, Noriaki; Sanui, Kazumasa; Mizota, Yuzo

    It is widely acknowledged that roads are the most important transport infrastructure in developing countries. Unlike railroads requiring organizations and systems to operate, individuals can drive on roads. Almost all donors have assisted developing countr ies for new road constructions and rehabilitations. Report of insufficient maintenance in the developing countries, however, has been notable. As a result of the maintenance problems, deterioration of roads is pr ogressing with speed more than expected. It causes the traffic safety problems and an obstacle of economic development. JICA and other donors recognize that this situation can not be overlooked and reci pient countries are increasing their expectation of obtaining assistance on road/bridge maintenance. JICA has implemented over 10 technical cooper ation projects for road/b ridge maintenance in developing countries. JICA conducted a study to review those projects comprehensively. That study aims at obtaining problems, lessons learned and discussion material for policy making and method improvement for future similar pr ojects. This report introduces the outline of the study including additional analysis and recommendations by the authors.

  5. 6 CFR 9.15 - Professional and technical services.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 6 Domestic Security 1 2010-01-01 2010-01-01 false Professional and technical services. 9.15 Section 9.15 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY RESTRICTIONS UPON LOBBYING Activities by Own Employees § 9.15 Professional and technical services. (a) The prohibition on the...

  6. 6 CFR 9.23 - Professional and technical services.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 6 Domestic Security 1 2010-01-01 2010-01-01 false Professional and technical services. 9.23 Section 9.23 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY RESTRICTIONS UPON LOBBYING Activities by Other than Own Employees § 9.23 Professional and technical services. (a) The...

  7. 49 CFR 20.205 - Professional and technical services.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Professional and technical services. 20.205 Section 20.205 Transportation Office of the Secretary of Transportation NEW RESTRICTIONS ON LOBBYING Activities by Own Employees § 20.205 Professional and technical services. (a) The prohibition on the use of...

  8. 30 CFR 777.13 - Reporting of technical data.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Reporting of technical data. 777.13 Section 777.13 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR... PROGRAMS GENERAL CONTENT REQUIREMENTS FOR PERMIT APPLICATIONS § 777.13 Reporting of technical data. (a) All...

  9. 78 FR 60866 - Hydrogen and Fuel Cell Technical Advisory Committee (HTAC)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-02

    ... DEPARTMENT OF ENERGY Hydrogen and Fuel Cell Technical Advisory Committee (HTAC) AGENCY: Office of...: This notice announces an open meeting of the Hydrogen and Fuel Cell Technical Advisory Committee (HTAC... Committee: The Hydrogen and Fuel Cell Technical Advisory Committee (HTAC) was established under section 807...

  10. Reengineering the project design process

    NASA Astrophysics Data System (ADS)

    Kane Casani, E.; Metzger, Robert M.

    1995-01-01

    In response to the National Aeronautics and Space Administration's goal of working faster, better, and cheaper, the Jet Propulsion Laboratory (JPL) has developed extensive plans to minimize cost, maximize customer and employee satisfaction, and implement small- and moderate-size missions. These plans include improved management structures and processes, enhanced technical design processes, the incorporation of new technology, and the development of more economical space- and ground-system designs. The Laboratory's new Flight Projects Implementation Development Office has been chartered to oversee these innovations and the reengineering of JPL's project design process, including establishment of the Project Design Center (PDC) and the Flight System Testbed (FST). Reengineering at JPL implies a cultural change whereby the character of the Laboratory's design process will change from sequential to concurrent and from hierarchical to parallel. The Project Design Center will support missions offering high science return, design to cost, demonstrations of new technology, and rapid development. Its computer-supported environment will foster high-fidelity project life-cycle development and more accurate cost estimating. These improvements signal JPL's commitment to meeting the challenges of space exploration in the next century.

  11. 48 CFR 1052.201-70 - Contracting Officer's Technical Representative (COTR) Designation and Authority.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... in writing. The term “technical direction” includes, without limitation, direction to the contractor... the actions of the contractor's employees. (d) Technical direction may be oral or in writing. The COTR... Technical Representative (COTR) Designation and Authority. 1052.201-70 Section 1052.201-70 Federal...

  12. Project officer's perspective: quality assurance as a management tool.

    PubMed

    Heiby, J

    1993-06-01

    Advances in the management of health programs in less developed countries (LDC) have not kept pace with the progress of the technology used. The US Agency for International Development mandated the Quality Assurance Project (QAP) to provide quality improvement technical assistance to primary health care systems in LDCs while developing appropriate quality assurance (QA) strategies. The quality of health care in recent years in the US and Europe focused on the introduction of management techniques developed for industry into health systems. The experience of the QAP and its predecessor, the PRICOR Project, shows that quality improvement techniques facilitate measurement of quality of care. A recently developed WHO model for the management of the sick child provides scientifically based standards for actual care. Since 1988, outside investigators measuring how LDC clinicians perform have revealed serious deficiencies in quality compared with the program's own standards. This prompted developed of new QA management initiatives: 1) communicating standards clearly to the program staff; 2) actively monitoring actual performance corresponds to these standards; and 3) taking action to improve performance. QA means that managers are expected to monitor service delivery, undertake problem solving, and set specific targets for quality improvement. Quality improvement methods strengthen supervision as supervisors can objectively assess health worker performance. QA strengthens the management functions that support service delivery, e.g., training, records management, finance, logistics, and supervision. Attention to quality can contribute to improved health worker motivation and effective incentive programs by recognition for a job well done and opportunities for learning new skills. These standards can also address patient satisfaction. QA challenges managers to aim for the optimal level of care attainable.

  13. 32 CFR 203.17 - Technical assistance provider reporting requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 2 2010-07-01 2010-07-01 false Technical assistance provider reporting requirements. 203.17 Section 203.17 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY... technical assistance provider shall submit progress reports, financial status reports, materials prepared...

  14. 32 CFR 203.17 - Technical assistance provider reporting requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 2 2014-07-01 2014-07-01 false Technical assistance provider reporting requirements. 203.17 Section 203.17 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY... technical assistance provider shall submit progress reports, financial status reports, materials prepared...

  15. 32 CFR 203.17 - Technical assistance provider reporting requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 2 2013-07-01 2013-07-01 false Technical assistance provider reporting requirements. 203.17 Section 203.17 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY... technical assistance provider shall submit progress reports, financial status reports, materials prepared...

  16. 32 CFR 203.17 - Technical assistance provider reporting requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 2 2011-07-01 2011-07-01 false Technical assistance provider reporting requirements. 203.17 Section 203.17 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY... technical assistance provider shall submit progress reports, financial status reports, materials prepared...

  17. 32 CFR 203.17 - Technical assistance provider reporting requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 2 2012-07-01 2012-07-01 false Technical assistance provider reporting requirements. 203.17 Section 203.17 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY... technical assistance provider shall submit progress reports, financial status reports, materials prepared...

  18. CCD detector development projects by the Beamline Technical Support Group at the Advanced Photon Source

    NASA Astrophysics Data System (ADS)

    Lee, John H.; Fernandez, Patricia; Madden, Tim; Molitsky, Michael; Weizeorick, John

    2007-11-01

    This paper will describe two ongoing detector projects being developed by the Beamline Technical Support Group at the Advanced Photon Source (APS) at Argonne National Laboratory (ANL). The first project is the design and construction of two detectors: a single-CCD system and a two-by-two Mosaic CCD camera for Small-Angle X-ray Scattering (SAXS). Both of these systems utilize the Kodak KAF-4320E CCD coupled to fiber optic tapers, custom mechanical hardware, electronics, and software developed at ANL. The second project is a Fast-CCD (FCCD) detector being developed in a collaboration between ANL and Lawrence Berkeley National Laboratory (LBNL). This detector will use ANL-designed readout electronics and a custom LBNL-designed CCD, with 480×480 pixels and 96 outputs, giving very fast readout.

  19. Development of Officer Selection Battery Forms 3 and 4. Technical Report 603.

    ERIC Educational Resources Information Center

    Fischl, M. A.; And Others

    This report describes the development, standardization, and validation of two parallel forms of the Officer Selection Battery, a 2-hour, group administrable, paper and pencil test for assessing men and women applying for the Reserve Officers Training Corps (ROTC). Based on an extensive job analysis, 1,400 experimental items in 12 job areas were…

  20. NASA Technical Standards Program and Implications for Lessons Learned and Technical Standard Integration

    NASA Technical Reports Server (NTRS)

    Gill, Paul S.; Garcia, Danny; Vaughan, William W.; Parker, Nelson C. (Technical Monitor)

    2002-01-01

    The National Aeronautics and Space Agency consists of fourteen Facilities throughout the United States. They are organized to support the Agency's principal Enterprises: (1) Space Science, (2) Earth Science, (3) Aerospace Technology, (4) Human Exploration and Development of Space, and (5) Biological and Physical Research. Technical Standards are important to the activities of each Enterprise and have been an integral part in the development and operation of NASA Programs and Projects since the Agency was established in 1959. However, for years each Center was responsible for its own standards development and selection of non-NASA technical standards that met the needs of Programs and Projects for which they were responsible. There were few Agencywide applicable Technical Standards, mainly those in area of safety. Department of Defense Standards and Specifications were the foundation and main source for Technical Standards used by the Agency. This process existed until about 1997 when NASA embarked on a Program to convert NASA's Center-developed Technical Standards into Agencywide endorsed NASA Preferred Technical Standards. In addition, action was taken regarding the formal adoption of non-NASA Technical Standards (DOD, SAE, ASTM, ASME, IEEE, etc.) as NASA Preferred Technical Standards.

  1. My Work in the NASA Glenn History Office and Records Management Office

    NASA Technical Reports Server (NTRS)

    Mate, Robert C.

    2004-01-01

    This is my fourth summer working with my mentor, Kevin P. Coleman, who is the Center History Coordinator, Center Records Manager, and Center Forms Manager. I am working in the GRC History Office with some overlap in the Records Management Office. I have three major projects this summer. First, I am assisting in the documentation of historic facilities. Second, I am involved in a project to organize files and create an archives at Plum Brook Station. Third, I have helped the records management office with its inventory of stored records at Plum Brook. Also, I received an award this summer for research work I had done for NASA in the past. First, my primary project is to help assemble documentation for historic facilities at Glenn. This is somewhat of an extension of my project from last summer. Last summer, I worked to compile a complete list of all of NASA s historic sites and landmarks (as designated by the National Park Service, as well as several private organizations) throughout the country. Then, I briefly researched the significance of historic designation under federal law. Finally, I put my findings into a report which was submitted to NASA Headquarters. Upon review by the NASA History Office and several center-level history officials, it was decided that NASA should work to update its documentation of its historic sites and landmarks since some of the documentation was outdated or unavailable. Until recently, many project managers and facility managers working at historic facilities were not even aware that their surroundings had been designated as historic under federal law (most specifically, the National Historic Preservation Act of 1966 and its amendments). Therefore, they were unaware of the legal obligations for historic preservation. This summer, my project is to research some of Glenn s historic sites and landmarks in more detail. The goal is to put together a template for documenting historic NASA facilities. The hope is that this template of

  2. The project office of the Gaia Data Processing and Analysis Consortium

    NASA Astrophysics Data System (ADS)

    Mercier, E.; Els, S.; Gracia, G.; O'Mullane, W.; Lock, T.; Comoretto, G.

    2010-07-01

    Gaia is Europe's future astrometry satellite which is currently under development. The data collected by Gaia will be treated and analyzed by the "Data Processing and Analysis Consortium" (DPAC). DPAC consists of over 400 scientists in more than 22 countries, which are currently developing the required data reduction, analysis and handling algorithms and routines. DPAC is organized in Coordination Units (CU's) and Data Processing Centres (DPCs). Each of these entities is individually responsible for the development of software for the processing of the different data. In 2008, the DPAC Project Office (PO) has been set-up with the task to manage the day-to-day activities of the consortium including implementation, development and operations. This paper describes the tasks DPAC faces and the role of the DPAC PO in the Gaia framework and how it supports the DPAC entities in their effort to fulfill the Gaia promise.

  3. Engineering, technical, and management support services

    NASA Technical Reports Server (NTRS)

    1994-01-01

    This report summarizes by task the engineering, technical, and management support services provided by Vitro Corporation to NASA Headquarters Office of Safety, Reliability, Maintainability, and Quality Assurance (now called Office of Safety and Mission Assurance (OSMA)) (Code Q) under Contract Number NASW-4311 from the period February 10, 1994. Each task summary includes significant Vitro accomplishments, conclusions, and recommendations for future efforts in each of the divisions within OSMA.

  4. Programs and Projects of the Office of General Counsel (OGC)

    EPA Pesticide Factsheets

    The Office of General Counsel (OGC) attorneys work with EPA headquarters and regional offices to provide legal support for the issuance of permits, the approval of state environmental programs, and the initiation and litigation of enforcement actions.

  5. Tribal Colleges and Universities/American Indian Research and Education Initiatives Advanced Manufacturing Technical Assistance Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Atcitty, Stanley

    The overall goal of this project is to establish a network of TCUs with essential advanced manufacturing (AM) facilities, associated training and education programs, and private sector and federal agency partnerships to both prepare an American Indian AM workforce and create economic and employment opportunities within Tribal communities through design, manufacturing, and marketing of high quality products. Some examples of high quality products involve next generation grid components such as mechanical energy storage, cabling for distribution of energy, and electrochemical energy storage enclosures. Sandia National Laboratories (Sandia) is tasked to provide technical advising, planning, and academic program development support formore » the TCU/American Indian Higher Education Consortium (AIHEC) Advanced Manufacturing Project. The TCUs include Bay Mills Community College (BMCC), Cankdeska Cikana Community College (CCCC), Navajo Technical University (NTU), Southwestern Indian Polytechnic Institute (SIPI), and Salish Kooteani College. AIHEC and Sandia, with collaboration from SIPI, will be establishing an 8-week summer institute on the SIPI campus during the summer of 2017. Up to 20 students from TCUs are anticipated to take part in the summer program. The goal of the program is to bring AM science, technology, engineering, and mathematics (STEM) awareness and opportunities for the American Indian students. Prior to the summer institute, Sandia will be providing reviews on curriculum plans at the each of the TCUs to ensure the content is consistent with current AM design and engineering practice. In addition, Sandia will provide technical assistance to each of the TCUs in regards to their current AM activities.« less

  6. Human Resource Development: Technical Education's Challenge. Proceedings of the Annual National Clinic on Technical Education (12th, Spokane, Washington, March 26-28, 1975).

    ERIC Educational Resources Information Center

    Washington State Community Coll. District 17, Spokane.

    Speeches and discussions are transcribed in this report, which also includes a listing of the American Technical Education Association (ATEA) committee members, exhibitors, officers, and directory of speakers. Speeches covered "Human Resource Development" by Gene Rutledge; "The Impact of Technical Education on Economic…

  7. 43 CFR 18.300 - Professional and technical services.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Professional and technical services. 18.300 Section 18.300 Public Lands: Interior Office of the Secretary of the Interior NEW RESTRICTIONS ON LOBBYING Activities by Other Than Own Employees § 18.300 Professional and technical services. (a) The...

  8. The Air Force Officer Qualifying Test: Validity, Fairness, and Bias. Technical Report

    ERIC Educational Resources Information Center

    Hardison, Chaitra M.; Sims, Carra S.; Wong, Eunice C.

    2010-01-01

    The Air Force has long recognized the importance of selecting the most qualified officers possible. For more than 60 years, it has relied on the Air Force Officer Qualifying Test (AFOQT) as one measure of those qualifications. A variety of concerns have been raised about whether the AFOQT is biased, too expensive, or even valid for predicting…

  9. 78 FR 6086 - Hydrogen and Fuel Cell Technical Advisory Committee (HTAC)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-29

    ... DEPARTMENT OF ENERGY Hydrogen and Fuel Cell Technical Advisory Committee (HTAC) AGENCY: Office of...). SUMMARY: This notice announces an open meeting (Webinar) of the Hydrogen and Fuel Cell Technical Advisory... Cell Technical Advisory Committee (HTAC) was established under Section 807 of the Energy Policy Act of...

  10. GROUND WATER TECHNICAL SUPPORT CENTER

    EPA Science Inventory

    EPA's Office of Research and Development operates a Ground Water Technical Support Center (GWTSC). The Center provides support on issues regarding subsurface contamination, contaminant fluxes to other media (e.g., surface water or air), and ecosystem restoration. The GWTSC creat...

  11. 77 FR 32013 - Truck Size and Weight; Technical Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-31

    ...-2012-0037] RIN 2125-AF45 Truck Size and Weight; Technical Correction AGENCY: Federal Highway...: This rule makes a technical correction to the regulations that govern Longer Combination Vehicles (LCV... INFORMATION CONTACT: John Nicholas, Truck Size and Weight Program Manager, Office of Freight Management and...

  12. FY 1994 program summary: Office of Technology Development, Office of Research and Development, Office of Demonstration, Testing, and Evaluation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-10-01

    The US Department of Energy (DOE) Office of Environmental Management, formerly the Office of Environmental Restoration and Waste Management (EM), was established in November 1989 as the first step toward correcting contamination problems resulting from nearly 50 years of nuclear weapons production and fuel processing activities. EM consolidates several DOE organizations previously responsible for the handling, treatment, and disposition of radioactive and hazardous waste. Within EM, the Office of Technology Development (OTD/EM-50) is responsible for developing technologies to meet DOE`s goal for environmental restoration. OTD manages an aggressive national program of applied research, development, demonstration, testing, and evaluation (RDDT andmore » E) for environmental cleanup, waste management, and related technologies. The program is designed to resolve major technical issues, to rapidly advanced beyond current technologies for environmental restoration and waste management operations, and to expedite compliance with applicable environmental laws and regulations. This report summarizes Fiscal Year 1994 (FY94) programmatic information, accomplishments, and planned activities relevant to the individual activities within OTD`s RDDT and E.« less

  13. 34 CFR 300.119 - Technical assistance and training activities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... EDUCATION OF CHILDREN WITH DISABILITIES State Eligibility Least Restrictive Environment (lre) § 300.119... 34 Education 2 2011-07-01 2010-07-01 true Technical assistance and training activities. 300.119 Section 300.119 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF...

  14. Environmental Measurements Laboratory fiscal year 1998: Accomplishments and technical activities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Erickson, M.D.

    1999-01-01

    The Environmental Measurements Laboratory (EML) is government-owned, government-operated, and programmatically under the DOE Office of Environmental Management. The Laboratory is administered by the Chicago Operations Office. EML provides program management, technical assistance and data quality assurance for measurements of radiation and radioactivity relating to environmental restoration, global nuclear nonproliferation, and other priority issues for the Department of Energy, as well as for other government, national, and international organizations. This report presents the technical activities and accomplishments of EML for Fiscal Year 1998.

  15. 7 CFR 600.9 - Major land resource area soil survey offices.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 6 2014-01-01 2014-01-01 false Major land resource area soil survey offices. 600.9... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE GENERAL ORGANIZATION § 600.9 Major land resource area soil... soil survey production. Major land resource area soil survey offices (MO) provide the technical...

  16. 7 CFR 600.9 - Major land resource area soil survey offices.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Major land resource area soil survey offices. 600.9... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE GENERAL ORGANIZATION § 600.9 Major land resource area soil... soil survey production. Major land resource area soil survey offices (MO) provide the technical...

  17. 7 CFR 600.9 - Major land resource area soil survey offices.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 6 2011-01-01 2011-01-01 false Major land resource area soil survey offices. 600.9... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE GENERAL ORGANIZATION § 600.9 Major land resource area soil... soil survey production. Major land resource area soil survey offices (MO) provide the technical...

  18. 7 CFR 600.9 - Major land resource area soil survey offices.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 6 2012-01-01 2012-01-01 false Major land resource area soil survey offices. 600.9... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE GENERAL ORGANIZATION § 600.9 Major land resource area soil... soil survey production. Major land resource area soil survey offices (MO) provide the technical...

  19. 7 CFR 600.9 - Major land resource area soil survey offices.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 6 2013-01-01 2013-01-01 false Major land resource area soil survey offices. 600.9... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE GENERAL ORGANIZATION § 600.9 Major land resource area soil... soil survey production. Major land resource area soil survey offices (MO) provide the technical...

  20. 2017 Building Technologies Office Peer Review Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    The 2017 Building Technologies Office Peer Review Report summarizes the feedback submitted by reviewers for the 109 Building Technologies Office (BTO) projects presented at the 2017 BTO Peer Review. The report presents an overview of the goals and activities under each technology program area, a summary of project scores for each program, and a brief analysis of general evaluation trends within each program area or its constituent subprograms.

  1. New Jersey Technical Assistance Project (N.J. TAP): "Educational Resources and Support Services on Behalf of Children with Multiple Sensory Impairment." Final Report.

    ERIC Educational Resources Information Center

    New Jersey State Dept. of Education, Trenton.

    This final report describes activities and accomplishments of the New Jersey Technical Assistance Project, a project to improve educational resources and support services for students with multiple sensory impairment (deaf-blindness). Activities and accomplishments are presented in a tabular format for each project goal and objective. The project…

  2. Mapping Our Genes: The Genome Projects: How Big, How Fast

    DOE R&D Accomplishments Database

    1988-04-01

    For the past 2 years, scientific and technical journals in biology and medicine have extensively covered a debate about whether and how to determine the function and order of human genes on human chromosomes and when to determine the sequence of molecular building blocks that comprise DNA in those chromosomes. In 1987, these issues rose to become part of the public agenda. The debate involves science, technology, and politics. Congress is responsible for ?writing the rules? of what various federal agencies do and for funding their work. This report surveys the points made so far in the debate, focusing on those that most directly influence the policy options facing the US Congress. Congressional interest focused on how to assess the rationales for conducting human genome projects, how to fund human genome projects (at what level and through which mechanisms), how to coordinate the scientific and technical programs of the several federal agencies and private interests already supporting various genome projects, and how to strike a balance regarding the impact of genome projects on international scientific cooperation and international economic competition in biotechnology. The Office of Technology Assessment (OTA) prepared this report with the assistance of several hundred experts throughout the world.

  3. A Conceptual View of the Officer Procurement Model (TOPOPS). Technical Report No. 73-73.

    ERIC Educational Resources Information Center

    Akman, Allan; Nordhauser, Fred

    This report presents the conceptual design of a computer-based linear programing model of the Air Force officer procurement system called TOPOPS. The TOPOPS model is an aggregate model which simulates officer accession and training and is directed at optimizing officer procurement in terms of either minimizing cost or maximizing accession quality…

  4. Competency model for the project managers of technical projects

    NASA Astrophysics Data System (ADS)

    Duncan, William R.

    1992-05-01

    Traditional job description techniques were developed to support compensation decisions for hourly wage earners in a manufacturing environment. Their resultant focus on activities performed on the job works well in this environment where the ability to perform the activity adequately is objectively verifiable by testing and observation. Although many organizations have adapted these techniques for salaried employees and service environments, the focus on activities performed has never been satisfactory. For example, stating that a project manager `prepares regular project status reports' tells us little about what to look for in a potential project manager or how to determine if a practicing project manager is ready for additional responsibilities. The concept of a `competency model' has been developed within the last decade to address this shortcoming. Competency models focus on what skills are needed to perform the tasks defined by the job description. For example, a project manager must be able to communicate well both orally and in writing in order to `prepare regular project status reports.'

  5. The PRISM project

    NASA Astrophysics Data System (ADS)

    Guilyardi, E.

    2003-04-01

    The European Union's PRISM infrastructure project (PRogram for Integrated earth System Modelling) aims at designing a flexible environment to easily assemble and run Earth System Models (http://prism.enes.org). Europe's widely distributed modelling expertise is both a strength and a challenge. Recognizing this, the PRISM project aims at developing an efficient shared modelling software infrastructure for climate scientists, providing them with an opportunity for greater focus on scientific issues, including the necessary scientific diversity (models and approaches). The proposed PRISM system includes 1) the use - or definition - and promotion of scientific and technical standards to increase component modularity, 2) an end-to-end software environment (coupler, user interface, diagnostics) to launch, monitor and analyze complex Earth System Models built around the existing and future community models, 3) testing and quality standards to ensure HPC performance on a variety of platforms and 4) community wide inputs and requirements capture in all stages of system specifications and design through user/developers meetings, workshops and thematic schools. This science driven project, led by 22 institutes* and started December 1st 2001, benefits from a unique gathering of scientific and technical expertise. More than 30 models (both global and regional) have expressed interest to be part of the PRISM system and 6 types of components have been identified: atmosphere, atmosphere chemistry, land surface, ocean, sea ice and ocean biochemistry. Progress and overall architecture design will be presented. * MPI-Met (Coordinator), KNMI (co-coordinator), MPI-M&D, Met Office, University of Reading, IPSL, Meteo-France, CERFACS, DMI, SMHI, NERSC, ETH Zurich, INGV, MPI-BGC, PIK, ECMWF, UCL-ASTR, NEC, FECIT, SGI, SUN, CCRLE

  6. 1. Photographic copy of photograph, in possession of SCIP Office, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Photographic copy of photograph, in possession of SCIP Office, Coolidge, AZ. No date, circa 1940. Photographer unknown. HEADQUARTERS OFFICE, 205 W. ROOSEVELT, COOLIDGE, AZ. - San Carlos Irrigation Project, San Carlos Irrigation Project Headquarters, 205 West Roosevelt, Coolidge, Pinal County, AZ

  7. 36 CFR 218.3 - Reviewing officer.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Agriculture or Under Secretary, Natural Resources and Environment is the reviewing officer. (b) The reviewing... Section 218.3 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE PROJECT-LEVEL... officer is the U.S. Department of Agriculture (USDA) or Forest Service official having the delegated...

  8. Innovative methods of popularizing technical education

    NASA Astrophysics Data System (ADS)

    Shkitsa, L. Y.; Panchuk, V. G.; Kornuta, V. A.

    2017-05-01

    There have been analyzed reasons of the loss of technical education’s popularity. Also, the analysis of known educational and production methods, oriented at the innovative model of development of society, was performed. It is stated that the acquisition of 21st century’s skills as a result of competition of technical education are natural for the DIY ideology, which was realized in the institutions like Fab Lab. The new educational strategy, based on project-based learning, is proposed to be implemented as a special laboratory with equipment, which would be a center of innovative development for students at the Technical University. Moreover, the list of projects planned for implementation, that includes not only projects, specific to a particular university, but also projects, demanded by society as a whole, is specified. It is worth to implement trendy projects in the laboratory, such as toy-like, ecological projects; projects of the energy dependence decrease or the energy efficiency increase, modern digital or innovative projects etc. The student should gain knowledge, skills and, possibly, equipment that are available for immediate usage on the labor market or for the realization of his own projects or the community’s projects in everyday life after the realization of the particular project at the laboratory

  9. 19 CFR 213.4 - Disclosure of receipt of technical assistance.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ....4 Section 213.4 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION INVESTIGATIONS OF UNFAIR PRACTICES IN IMPORT TRADE TRADE REMEDY ASSISTANCE § 213.4 Disclosure of receipt of technical assistance. An... received technical assistance from the Trade Remedy Assistance Office in any resulting petition, complaint...

  10. 19 CFR 213.4 - Disclosure of receipt of technical assistance.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ....4 Section 213.4 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION INVESTIGATIONS OF UNFAIR PRACTICES IN IMPORT TRADE TRADE REMEDY ASSISTANCE § 213.4 Disclosure of receipt of technical assistance. An... received technical assistance from the Trade Remedy Assistance Office in any resulting petition, complaint...

  11. 19 CFR 213.4 - Disclosure of receipt of technical assistance.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ....4 Section 213.4 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION INVESTIGATIONS OF UNFAIR PRACTICES IN IMPORT TRADE TRADE REMEDY ASSISTANCE § 213.4 Disclosure of receipt of technical assistance. An... received technical assistance from the Trade Remedy Assistance Office in any resulting petition, complaint...

  12. 19 CFR 213.4 - Disclosure of receipt of technical assistance.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ....4 Section 213.4 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION INVESTIGATIONS OF UNFAIR PRACTICES IN IMPORT TRADE TRADE REMEDY ASSISTANCE § 213.4 Disclosure of receipt of technical assistance. An... received technical assistance from the Trade Remedy Assistance Office in any resulting petition, complaint...

  13. 78 FR 42821 - Agency Information Collection (Technical Industry Standards) Activities Under OMB Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-17

    ... (Technical Industry Standards) Activities Under OMB Review AGENCY: Office of Acquisition and Logistics... Affairs Acquisition Regulation (VAAR) Provision 852.211-72 (formerly 852.211-75), Technical Industry.... Abstract: VAAR provision 852.211-72, Technical Industry Standards, requires items offered for sale to VA...

  14. The Independent Technical Analysis Process Final Report 2006-2007.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Duberstein, Corey; Ham, Kenneth; Dauble, Dennis

    2007-03-01

    The Bonneville Power Administration (BPA) contracted with the Pacific Northwest National Laboratory (PNNL) to provide technical analytical support for system-wide fish passage information (BPA Project No. 2006-010-00). The goal of this project was to produce rigorous technical analysis products using independent analysts and anonymous peer reviewers. This project provided an independent technical source for non-routine fish passage analyses while allowing routine support functions to be performed by other well-qualified entities. The Independent Technical Analysis Process (ITAP) was created to provide non-routine analysis for fish and wildlife agencies and tribes in particular and the public in general on matters related tomore » juvenile and adult salmon and steelhead passage through the mainstem hydrosystem. The process was designed to maintain the independence of analysts and reviewers from parties requesting analyses, to avoid potential bias in technical products. The objectives identified for this project were to administer a rigorous, transparent process to deliver unbiased technical assistance necessary to coordinate recommendations for storage reservoir and river operations that avoid potential conflicts between anadromous and resident fish. Seven work elements, designated by numbered categories in the Pisces project tracking system, were created to define and accomplish project goals as follows: (1) 118 Coordination - Coordinate technical analysis and review process: (a) Retain expertise for analyst/reviewer roles. (b) Draft research directives. (c) Send directive to the analyst. (d) Coordinate two independent reviews of the draft report. (e) Ensure reviewer comments are addressed within the final report. (2) 162 Analyze/Interpret Data - Implement the independent aspects of the project. (3) 122 Provide Technical Review - Implement the review process for the analysts. (4) 132 Produce Annual Report - FY06 annual progress report with Pisces Disseminate (5

  15. 33 CFR 211.22 - Real estate Claims Officers.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Real estate Claims Officers. 211..., DEPARTMENT OF DEFENSE REAL ESTATE ACTIVITIES OF THE CORPS OF ENGINEERS IN CONNECTION WITH CIVIL WORKS PROJECTS Real Estate Claims § 211.22 Real estate Claims Officers. In each Division Office the Division...

  16. 33 CFR 211.22 - Real estate Claims Officers.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Real estate Claims Officers. 211..., DEPARTMENT OF DEFENSE REAL ESTATE ACTIVITIES OF THE CORPS OF ENGINEERS IN CONNECTION WITH CIVIL WORKS PROJECTS Real Estate Claims § 211.22 Real estate Claims Officers. In each Division Office the Division...

  17. 33 CFR 211.22 - Real estate Claims Officers.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Real estate Claims Officers. 211..., DEPARTMENT OF DEFENSE REAL ESTATE ACTIVITIES OF THE CORPS OF ENGINEERS IN CONNECTION WITH CIVIL WORKS PROJECTS Real Estate Claims § 211.22 Real estate Claims Officers. In each Division Office the Division...

  18. 33 CFR 211.22 - Real estate Claims Officers.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Real estate Claims Officers. 211..., DEPARTMENT OF DEFENSE REAL ESTATE ACTIVITIES OF THE CORPS OF ENGINEERS IN CONNECTION WITH CIVIL WORKS PROJECTS Real Estate Claims § 211.22 Real estate Claims Officers. In each Division Office the Division...

  19. Experiences on Licensed Offices of Surveying and Cadastre (losc) in Adana, Turkey

    NASA Astrophysics Data System (ADS)

    Yalcin, G.; Ates, H. B.

    2016-10-01

    Modern cadastre means to integrate the registration of the real estates with the data of the other related activities such as taxation, mortgage, valuation, land-use, land cover,..etc. In Turkey cadastral technical activities were carried out by General Directorate of Land Registry and Cadastre until 2005. But then cadastre sustainment services were transferred to private sector according to "Law on Cadastre" technical parts of initial cadastre and according to the Law on "Licensed Engineers of Surveying and Cadastre and Offices". In this article services of Licensed Offices of Surveying and Cadastre (LOSCs) are presented and the experiences in Adana are shared.

  20. Energy materials coordinating committee (EMaCC). Annual technical report, fiscal year 2004

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    none,

    2005-08-31

    The DOE Energy Materials Coordinating Committee (EMaCC) serves primarily to enhance coordination among the Department's materials programs and to further effective use of materials expertise within the Department. These functions are accomplished through the exchange of budgetary and planning information among program managers and through technical meetings/workshops on selected topics involving both DOE and major contractors. In addition, EMaCC assists in obtaining materials-related inputs for both intra- and interagency compilations. Topical subcommittees of the EMaCC are responsible for conducting seminars and otherwise facilitating information flow between DOE organizational units in materials areas of particular importance to the Department. The EMaCCmore » Terms of Reference were recently modified and developed into a Charter that was approved on June 5, 2003. As a result of this reorganization, the existing subcommittees were disbanded and new subcommittees are being formed. The FY 2004 budget summary for DOE Materials Activities is presented on page 8. The distribution of these funds between DOE laboratories, private industry, academia and other organizations is presented in tabular form on page 10. Following the budget summary is a set of detailed program descriptions for the FY 2004 DOE Materials activities. These descriptions are presented according to the organizational structure of the Department. A mission statement, a budget summary listing the project titles and FY 2004 funding, and detailed project summaries are presented for each Assistant Secretary office, the Office of Science, and the National Nuclear Security Administration. The project summaries also provide DOE, laboratory, academic and industrial contacts for each project, as appropriate.« less

  1. Energy materials coordinating committee (EMaCC). Annual technical report, fiscal year 2005

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    2006-09-29

    The DOE Energy Materials Coordinating Committee (EMaCC) serves primarily to enhance coordination among the Department's materials programs and to further effective use of materials expertise within the Department. These functions are accomplished through the exchange of budgetary and planning information among program managers and through technical meetings/workshops on selected topics involving both DOE and major contractors. In addition, EMaCC assists in obtaining materials-related inputs for both intra- and interagency compilations. Topical subcommittees of the EMaCC are responsible for conducting seminars and otherwise facilitating information flow between DOE organizational units in materials areas of particular importance to the Department. The EMaCCmore » Terms of Reference were recently modified and developed into a Charter that was approved on June 5, 2003. As a result of this reorganization, the existing subcommittees were disbanded and new subcommittees are being formed. The FY 2004 budget summary for DOE Materials Activities is presented on page 8. The distribution of these funds between DOE laboratories, private industry, academia and other organizations is presented in tabular form on page 10. Following the budget summary is a set of detailed program descriptions for the FY 2004 DOE Materials activities. These descriptions are presented according to the organizational structure of the Department. A mission statement, a budget summary listing the project titles and FY 2004 funding, and detailed project summaries are presented for each Assistant Secretary office, the Office of Science, and the National Nuclear Security Administration. The project summaries also provide DOE, laboratory, academic and industrial contacts for each project, as appropriate.« less

  2. DSN Aperture Enhancement Project Office

    NASA Technical Reports Server (NTRS)

    Marina, Miguel

    2012-01-01

    All contracts are underway for antennas, associated facilities modifications and new transmitters. High risk CPI 100kW klystron and JPL high power uplink microwave components have been designed, prototyped and successfully tested at GDSCC to support the 80kW transmitter implementation and testing at vendor facility. Open issues, which might affect project delivery date, have plans in place or are being created, to maintain DSS-35 Operational Date. There are no known open issues that affect performance. Overall good progress has been made in all areas (procurements, contracts, design and development) and the project is confident that DSS-35 & 36 antennas and the three 80kW Uplink systems will be delivered according to plan.

  3. Customized Resources | OSTI, US Dept of Energy Office of Scientific and

    Science.gov Websites

    Technical Information skip to main content Sign In Create Account OSTI.GOV title logo U.S . Department of Energy Office of Scientific and Technical Information Search terms: Advanced search options Tools Public Access Policy Data Services & Dev Tools About FAQs News Sign In Create Account This

  4. DOE Collections | OSTI, US Dept of Energy Office of Scientific and

    Science.gov Websites

    Technical Information skip to main content Sign In Create Account OSTI.GOV title logo U.S . Department of Energy Office of Scientific and Technical Information Search terms: Advanced search options Tools Public Access Policy Data Services & Dev Tools About FAQs News Sign In Create Account This

  5. 76 FR 7870 - Agency Information Collection Activities: Cybersecurity and Communications Technical Assistance...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-11

    ... DEPARTMENT OF HOMELAND SECURITY [Docket No. DHS-2010-0006] Agency Information Collection Activities: Cybersecurity and Communications Technical Assistance Request and Evaluation AGENCY: National... Programs Directorate (NPPD), Office of Cybersecurity and Communications (CS&C), Office of Emergency...

  6. Adapting Project Management Practices to Research-Based Projects

    NASA Technical Reports Server (NTRS)

    Bahr, P.; Baker, T.; Corbin, B.; Keith, L.; Loerch, L.; Mullenax, C.; Myers, R.; Rhodes, B.; Skytland, N.

    2007-01-01

    From dealing with the inherent uncertainties in outcomes of scientific research to the lack of applicability of current NASA Procedural Requirements guidance documentation, research-based projects present challenges that require unique application of classical project management techniques. If additionally challenged by the creation of a new program transitioning from basic to applied research in a technical environment often unfamiliar with the cost and schedule constraints addressed by project management practices, such projects can find themselves struggling throughout their life cycles. Finally, supplying deliverables to a prime vehicle customer, also in the formative stage, adds further complexity to the development and management of research-based projects. The Biomedical Research and Countermeasures Projects Branch at NASA Johnson Space Center encompasses several diverse applied research-based or research-enabling projects within the newly-formed Human Research Program. This presentation will provide a brief overview of the organizational structure and environment in which these projects operate and how the projects coordinate to address and manage technical requirements. We will identify several of the challenges (cost, technical, schedule, and personnel) encountered by projects across the Branch, present case reports of actions taken and techniques implemented to deal with these challenges, and then close the session with an open forum discussion of remaining challenges and potential mitigations.

  7. 77 FR 31868 - Notice of Submission of Proposed Information Collection to OMB; Office of Native American...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-30

    ... Proposed Information Collection to OMB; Office of Native American Programs (ONAP) Training and Technical.... 552) authorizes HUD to award training and technical assistance contracts on a competitive basis. HUD intends to competitively award training and technical assistance contracts to national and regional...

  8. Teaching weather and climate science in primary schools - a pilot project from the UK Met Office

    NASA Astrophysics Data System (ADS)

    Orrell, Richard; Liggins, Felicity; Challenger, Lesley; Lethem, Dom; Campbell, Katy

    2017-04-01

    Wow Schools is a pilot project from the Met Office with an aim to inspire and educate the next generation of scientists and, uniquely, use the data collected by schools to improve weather forecasts and warnings across the UK. Wow Schools was launched in late 2015 with a competition open to primary schools across the UK. 74 schools entered the draw, all hoping to be picked as one of the ten lucky schools taking part in the pilot scheme. Each winning school received a fully automatic weather station (AWS), enabling them to transmit real-time local weather observations to the Met Office's Weather Observation Website (WOW - wow.metoffice.gov.uk), an award winning web portal for uploading and sharing a range of environmental observations. They were also given a package of materials designed to get students out of the classroom to observe the weather, get hands-on with the science underpinning weather forecasting, and analyse the data they are collecting. The curriculum-relevant materials were designed with the age group 7 to 11 in mind, but could be extended to support other age groups. Each school was offered a visit by a Wow Schools Ambassador (a Met Office employee) to bring the students' learning to life, and access to a dedicated forecast for its location generated by our new supercomputer. These forecasts are improved by the school's onsite AWS reinforcing the link between observations and forecast production. The Wow Schools pilot ran throughout 2016. Here, we present the initial findings of the project, examining the potential benefits and challenges of working with schools across the UK to: enrich students' understanding of the science of weather forecasting; to source an ongoing supply of weather observations and discover how these might be used in the forecasting process; and explore what materials and business model(s) would be most useful and affordable if a wider roll-out of the initiative was undertaken.

  9. Concepts for a NASA Applied Spaceflight Environments Office

    NASA Technical Reports Server (NTRS)

    Edwards, David L.; Burns, Howard D.; Xapsos, Michael; Spann, Jim; Suggs, Robert

    2010-01-01

    The National Aeronautics and Space Administration (NASA) is launching a bold and ambitious new space initiative. A significant part of this new initiative includes exploration of new worlds, the development of more innovative technologies, and expansion our presence in the solar system. A common theme to this initiative is the exploration of space beyond Low Earth Orbit (LEO). As currently organized, NASA does not have an Agency-level office that provides coordination of space environment research and development. This has contributed to the formation of a gap between spaceflight environments knowledge and the application of this knowledge for multi-program use. This paper outlines a concept to establish a NASA-level Applied Spaceflight Environments (ASE) office that will provide coordination and funding for sustained multi-program support in three technical areas that have demonstrated these needs through customer requests. These technical areas are natural environments characterization and modeling, materials and systems analysis and test, and operational space environments modeling and prediction. This paper will establish the need for the ASE, discuss a concept for organizational structure and outline the scope in the three technical areas

  10. 78 FR 44104 - Notice of Intent To Issue a Funding Opportunity Announcement; Technical Assistance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-23

    ... Funding Opportunity Announcement; Technical Assistance AGENCY: Federal Energy Management Program, Office.... This notice also is to inform Federal agencies of the availability of technical assistance in advance.... FOR FURTHER INFORMATION CONTACT: For requests for technical assistance regarding CHP, please contact...

  11. 7 CFR 2.37 - Chief Information Officer.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... technology program or project. (3) Providing advice and other assistance to the Secretary and other senior... selection of agency Chief Information Officers and agency major information technology system project... recommendations to Agency Heads for the removal or replacement of information technology project managers, when...

  12. 5 CFR 470.311 - Final project approval.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 470.311 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL... Projects § 470.311 Final project approval. (a) The Office of Personnel Management will consider all timely...) The Office of Personnel Management shall provide a copy of the final version of the project plan to...

  13. Project LIFE--Language Improvement to Facilitate Education. (Technical Progress Report; Third Quarter; March 1, 1974-May 31, 1974).

    ERIC Educational Resources Information Center

    National Foundation for the Improvement of Education, Washington, DC.

    Reported is the third quarter, fiscal year 1974 (March 1, 1974-May 31, 1974) technical progress of Project LIFE (Language Improvement to Facilitate Education), toward developing an instructional system in which filmstrips in the areas of perceptual training, perceptual thinking, and language/reading are used to assist hearing impaired children in…

  14. Tribal Colleges and Universitie/American Indian Higher Education Consortium Advanced Manufacturing Technical Assistance Project.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Atcitty, Stanley

    The National Nuclear Security Agency (NNSA) created a Minority Serving Institution Partnership Plan (MSIPP) to 1) align investments in a university capacity and workforce development with the NNSA mission to develop the needed skills and talent for NNSA’s enduring technical workforce at the laboratories and production plants and 2) to enhance research and education at under-represented colleges and universities. Out of this effort, MSIPP launched a new program in early FY17 focused on Tribal Colleges and Universities (TCUs). The following report summarizes the project focus and status update during this reporting period.

  15. Tribal Colleges and Universitie/American Indian Higher Education Consortium Advanced Manufacturing Technical Assistance Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Atcitty, Stanley

    The National Nuclear Security Agency (NNSA) created a Minority Serving Institution Partnership Plan (MSIPP) to 1) align investments in a university capacity and workforce development with the NNSA mission to develop the needed skills and talent for NNSA’s enduring technical workforce at the laboratories and production plants and 2) to enhance research and education at under-represented colleges and universities. Out of this effort, MSIPP launched a new program in early FY17 focused on Tribal Colleges and Universities (TCUs). The following report summarizes the project focus and status update during this reporting period.

  16. NASA/DOD Aerospace Knowledge Diffusion Research Project. Paper 34: Users and uses of DOD technical reports: A report from the field

    NASA Technical Reports Server (NTRS)

    Pinelli, Thomas E.; Barclay, Rebecca O.; Kennedy, John M.

    1993-01-01

    The NASA/DoD Aerospace Knowledge Diffusion Research Project attempts to understand the information environment in which U.S. aerospace engineers and scientists work, the information-seeking behavior of U.S. aerospace engineers and scientists, and the factors that influence the use of scientific and technical information (STI) (Pinelli, Barclay, and Kennedy, 1991). Such an understanding could (1) lead to the development of practical theory, (2) contribute to the design and development of aerospace information systems, and (3) have practical implications for transferring the results of federally funded aerospace research and development (R&D) to the U.S. aerospace community. This paper presents data from two information-seeking behavior studies involving U.S. aerospace engineers and scientists that were undertaken as Phase 1 activities of the NASA/DoD Aerospace Knowledge Diffusion Research Project. Responses from three groups of respondents - DoD, other government, and industry - are presented for two sets of selected questions. One set focuses on DoD technical reports: their use and importance, reasons for non-use, the factors affecting their use, the sources used to find out about them and the sources used to physically obtain them, and the quality of DoD technical reports. The second set focuses on information sources used in problem solving: the use of U.S. government technical reports in problem solving and the information sources used to find out about U.S. government technical reports.

  17. 75 FR 59705 - Hydrogen and Fuel Cell Technical Advisory Committee (HTAC)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-28

    ... DEPARTMENT OF ENERGY Hydrogen and Fuel Cell Technical Advisory Committee (HTAC) AGENCY: Department of Energy, Office of Energy Efficiency and Renewable Energy. ACTION: Notice of open meeting. SUMMARY: The Hydrogen and Fuel Cell Technical Advisory Committee (HTAC) was established under section 807 of...

  18. 75 FR 26743 - Hydrogen and Fuel Cell Technical Advisory Committee (HTAC)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-12

    ... DEPARTMENT OF ENERGY Hydrogen and Fuel Cell Technical Advisory Committee (HTAC) AGENCY: Department of Energy, Office of Energy Efficiency and Renewable Energy. ACTION: Notice of Open Meeting. SUMMARY: The Hydrogen and Fuel Cell Technical Advisory Committee (HTAC) was established under section 807 of...

  19. Manning Army Equal Opportunity Officer Positions

    DTIC Science & Technology

    2013-03-01

    equality , and other social dynamics. This long overdue initiative identified organizational and cultural impediments that had essentially prevented...Manning Army Equal Opportunity Officer Positions by Colonel Angela M. Odom United States Army...TYPE STRATEGY RESEARCH PROJECT .33 3. DATES COVERED (From - To) 4. TITLE AND SUBTITLE Manning Army Equal Opportunity Officer Positions 5a

  20. Administrative Areas/Offices.

    ERIC Educational Resources Information Center

    American School & University, 2003

    2003-01-01

    Presents administrative areas/offices considered outstanding in a competition, which judged the most outstanding learning environments at educational institutions nationwide. Jurors spent two days reviewing projects, focusing on concepts and ideas that made them exceptional. For each citation, the article offers information on the firm, client,…

  1. Smart Gun Technology project. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weiss, D.R.

    The goal of the Smart Gun Technology project is to eliminate the capability of an unauthorized user form firing a law officer`s firearm by implementing user-recognizing-and-authorizing (or {open_quotes}smart{close_quotes}) surety technologies. This project was funded by the National Institute of Justice. This report lists the findings and results of the project`s three primary objectives. First, to find and document the requirements for a smart firearm technology that law enforcement officers will value. Second, to investigate, evaluate, and prioritize technologies that meet the requirements for a law enforcement officer`s smart firearm. Third, to demonstrate and document the most promising technology`s usefulness inmore » models of a smart firearm.« less

  2. Bangladesh Agro-Climatic Environmental Monitoring Project

    NASA Technical Reports Server (NTRS)

    Vermillion, C.; Maurer, H.; Williams, M.; Kamowski, J.; Moore, T.; Maksimovich, W.; Obler, H.; Gilbert, E.

    1988-01-01

    The Agro-Climatic Environmental Monitoring Project (ACEMP) is based on a Participating Agency Service Agreement (PASA) between the Agency for International Development (AID) and the National Oceanic and Atmospheric Administration (NOAA). In FY80, the Asia Bureau and Office of Federal Disaster Assistance (OFDA), worked closely to develop a funding mechanism which would meet Bangladesh's needs both for flood and cyclone warning capability and for application of remote sensing data to development problems. In FY90, OFDA provided for a High Resolution Picture Transmission (HRPT) receiving capability to improve their forecasting accuracy for cyclones, flooding and storm surges. That equipment is primarily intended as a disaster prediction and preparedness measure. The ACEM Project was designed to focus on the development applications of remote sensing technology. Through this Project, AID provided to the Bangladesh Government (BDG) the equipment, technical assistance, and training necessary to collect and employ remote sensing data made available by satellites as well as hydrological data obtained from data collection platforms placed in major rivers. The data collected will enable the BDG to improve the management of its natural resources.

  3. Reliability analysis in the Office of Safety, Environmental, and Mission Assurance (OSEMA)

    NASA Astrophysics Data System (ADS)

    Kauffmann, Paul J.

    1994-12-01

    The technical personnel in the SEMA office are working to provide the highest degree of value-added activities to their support of the NASA Langley Research Center mission. Management perceives that reliability analysis tools and an understanding of a comprehensive systems approach to reliability will be a foundation of this change process. Since the office is involved in a broad range of activities supporting space mission projects and operating activities (such as wind tunnels and facilities), it was not clear what reliability tools the office should be familiar with and how these tools could serve as a flexible knowledge base for organizational growth. Interviews and discussions with the office personnel (both technicians and engineers) revealed that job responsibilities ranged from incoming inspection to component or system analysis to safety and risk. It was apparent that a broad base in applied probability and reliability along with tools for practical application was required by the office. A series of ten class sessions with a duration of two hours each was organized and scheduled. Hand-out materials were developed and practical examples based on the type of work performed by the office personnel were included. Topics covered were: Reliability Systems - a broad system oriented approach to reliability; Probability Distributions - discrete and continuous distributions; Sampling and Confidence Intervals - random sampling and sampling plans; Data Analysis and Estimation - Model selection and parameter estimates; and Reliability Tools - block diagrams, fault trees, event trees, FMEA. In the future, this information will be used to review and assess existing equipment and processes from a reliability system perspective. An analysis of incoming materials sampling plans was also completed. This study looked at the issues associated with Mil Std 105 and changes for a zero defect acceptance sampling plan.

  4. Reliability analysis in the Office of Safety, Environmental, and Mission Assurance (OSEMA)

    NASA Technical Reports Server (NTRS)

    Kauffmann, Paul J.

    1994-01-01

    The technical personnel in the SEMA office are working to provide the highest degree of value-added activities to their support of the NASA Langley Research Center mission. Management perceives that reliability analysis tools and an understanding of a comprehensive systems approach to reliability will be a foundation of this change process. Since the office is involved in a broad range of activities supporting space mission projects and operating activities (such as wind tunnels and facilities), it was not clear what reliability tools the office should be familiar with and how these tools could serve as a flexible knowledge base for organizational growth. Interviews and discussions with the office personnel (both technicians and engineers) revealed that job responsibilities ranged from incoming inspection to component or system analysis to safety and risk. It was apparent that a broad base in applied probability and reliability along with tools for practical application was required by the office. A series of ten class sessions with a duration of two hours each was organized and scheduled. Hand-out materials were developed and practical examples based on the type of work performed by the office personnel were included. Topics covered were: Reliability Systems - a broad system oriented approach to reliability; Probability Distributions - discrete and continuous distributions; Sampling and Confidence Intervals - random sampling and sampling plans; Data Analysis and Estimation - Model selection and parameter estimates; and Reliability Tools - block diagrams, fault trees, event trees, FMEA. In the future, this information will be used to review and assess existing equipment and processes from a reliability system perspective. An analysis of incoming materials sampling plans was also completed. This study looked at the issues associated with Mil Std 105 and changes for a zero defect acceptance sampling plan.

  5. 76 FR 28759 - Hydrogen and Fuel Cell Technical Advisory Committee (HTAC)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-18

    ... Advisory Committee (HTAC) was established under section 807 of the Energy Policy Act of 2005 (EPACT... DEPARTMENT OF ENERGY Office of Energy Efficiency and Renewable Energy Hydrogen and Fuel Cell Technical Advisory Committee (HTAC) AGENCY: Office of Energy Efficiency and Renewable Energy, Department of...

  6. Expanding the Lester Hill Experience: A Report on Two 'Branch Office' Simulations

    ERIC Educational Resources Information Center

    Melvin, Opal B.

    1976-01-01

    Describes use of the Lester Hill Office Simulation, a program taught at the Tishomingo County Area Vocational-Technical Center in Mississippi. A fictitious company which provides students with the opportunity to gain realistic office experience in a classroom setting. Suggested ideas and optional activities can be used by teachers as a starting…

  7. Development and Standardization of the Air Force Officer Qualifying Test Form M.

    ERIC Educational Resources Information Center

    Miller, Robert E.

    Air Force Officer Qualifying Test (AFOQT) Form M was constructed as a replacement for AFOQT Form L in Fiscal Year 1974. The new form serves the same purposes as its predecessor and possesses basically the same characteristics. It yields Pilot, Navigator-Technical, Officer Quality, Verbal, and Quantitative composite scores. Three sets of conversion…

  8. [The Ineq-Cities research project on urban health inequalities: knowledge dissemination and transfer in Spain].

    PubMed

    Camprubí, Lluís; Díez, Èlia; Morrison, Joana; Borrell, Carme

    2014-01-01

    The Ineq-Cities project analyzed inequalities in mortality in small areas and described interventions to reduce inequalities in health in 16 European cities. This field note describes the dissemination of the project in Spain. In accordance with the recommendations of the project, the objective was to translate relevant results to key stakeholders - mainly technical staff, municipal officers and local social agents - and to provide an introduction to urban inequalities in health and strategies to address them. Twenty-four workshops were given, attended by more than 350 professionals from 92 municipalities. Knowledge dissemination consisted of the publication of a short book on inequalities in health and the approach to this problem in cities and three articles in nonspecialized media, a proposal for a municipal motion, and knowledge dissemination activities in social networks. Users rated these activities highly and stressed the need to systematize these products. This process may have contributed to the inclusion of health inequalities in the political agenda and to the training of officers to correct them. Copyright © 2013 SESPAS. Published by Elsevier Espana. All rights reserved.

  9. 25 CFR 89.32 - Notice from the principal officer.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... negotiate with attorneys or with technical specialists shall be sent by the principal tribal officer to the... specialists, as the case may be, the purpose for which such assistance is needed and the scope of the intended...

  10. 77 FR 2714 - Hydrogen and Fuel Cell Technical Advisory Committee (HTAC)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-19

    ... DEPARTMENT OF ENERGY Hydrogen and Fuel Cell Technical Advisory Committee (HTAC) AGENCY: Department of Energy, Office of Energy Efficiency and Renewable Energy. ACTION: Notice of open meeting, Webinar. SUMMARY: This notice announces an open meeting of the Hydrogen and Fuel Cell Technical Advisory Committee...

  11. 78 FR 18578 - Hydrogen and Fuel Cell Technical Advisory Committee (HTAC)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-27

    ... DEPARTMENT OF ENERGY Office of Energy Efficiency and Renewable Energy Hydrogen and Fuel Cell... and Fuel Cell Technical Advisory Committee (HTAC). The Federal Advisory Committee Act, Public Law 92... Cell Technical Advisory Committee (HTAC) was established under section 807 of the Energy Policy Act of...

  12. 7 CFR 658.6 - Technical assistance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Secretary for Natural Resources and Environment, Office of the Secretary, Department of Agriculture... 7 Agriculture 6 2013-01-01 2013-01-01 false Technical assistance. 658.6 Section 658.6 Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF...

  13. 7 CFR 658.6 - Technical assistance.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Secretary for Natural Resources and Environment, Office of the Secretary, Department of Agriculture... 7 Agriculture 6 2014-01-01 2014-01-01 false Technical assistance. 658.6 Section 658.6 Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF...

  14. 7 CFR 658.6 - Technical assistance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Secretary for Natural Resources and Environment, Office of the Secretary, Department of Agriculture... 7 Agriculture 6 2011-01-01 2011-01-01 false Technical assistance. 658.6 Section 658.6 Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF...

  15. 7 CFR 658.6 - Technical assistance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Secretary for Natural Resources and Environment, Office of the Secretary, Department of Agriculture... 7 Agriculture 6 2012-01-01 2012-01-01 false Technical assistance. 658.6 Section 658.6 Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF...

  16. 7 CFR 658.6 - Technical assistance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Secretary for Natural Resources and Environment, Office of the Secretary, Department of Agriculture... 7 Agriculture 6 2010-01-01 2010-01-01 false Technical assistance. 658.6 Section 658.6 Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF...

  17. 24 CFR 115.209 - Technical assistance.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Technical assistance. 115.209 Section 115.209 Housing and Urban Development Regulations Relating to Housing and Urban Development OFFICE OF ASSISTANT SECRETARY FOR EQUAL OPPORTUNITY, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT FAIR...

  18. 24 CFR 115.209 - Technical assistance.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Technical assistance. 115.209 Section 115.209 Housing and Urban Development Regulations Relating to Housing and Urban Development OFFICE OF ASSISTANT SECRETARY FOR EQUAL OPPORTUNITY, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT FAIR...

  19. 24 CFR 115.209 - Technical assistance.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Technical assistance. 115.209 Section 115.209 Housing and Urban Development Regulations Relating to Housing and Urban Development OFFICE OF ASSISTANT SECRETARY FOR EQUAL OPPORTUNITY, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT FAIR...

  20. 24 CFR 115.209 - Technical assistance.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Technical assistance. 115.209 Section 115.209 Housing and Urban Development Regulations Relating to Housing and Urban Development OFFICE OF ASSISTANT SECRETARY FOR EQUAL OPPORTUNITY, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT FAIR...

  1. Ahuachapan geothermal project: a technical and economic assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bloomster, C.H.; DiPippo; Kuwada, J.T.

    Theeconomic and technical factors involved in using geothermal energy at Ahuachapan are examined. The experience at Ahuachapan is evaluated in relation to conditions prevailing in El Salvador and to conditions in the U.S. technical characteristics considered are: geological characteristics, well programs and gathering system, well productivity and geofluid characteristics, and energy conversion systems. Economic factors considered for El Salvador are: construction costs; environmental control costs; operating experience and costs; financing; taxes, subsidies, or incentives; marketing; and electrical system characteristics. (MHR)

  2. NASA/DOD Aerospace Knowledge Diffusion Research Project. Paper 33: Technical communications practices and the use of information technologies as reported by Dutch and US aerospace engineers

    NASA Technical Reports Server (NTRS)

    Barclay, Rebecca O.; Pinelli, Thomas E.; Tan, Axel S. T.; Kennedy, John M.

    1993-01-01

    As part of Phase 4 of the NASA/DOD Aerospace Knowledge Diffusion Research Project, two studies were conducted that investigated the technical communications practices of Dutch and U.S. aerospace engineers and scientists. A self-administered questionnaire was distributed to aerospace engineers and scientists at the National Aerospace Laboratory (The Netherlands), and NASA ARC (U.S.), and NASA LaRC (U.S.). This paper presents responses of the Dutch and U.S. participants to selected questions concerning four of the seven project objectives: determining the importance of technical communications to aerospace engineering professionals, investigating the production of technical communications, examining the use and importance of computer and information technology, and exploring the use of electronic networks.

  3. Financial Management in the Strategic Systems Project Office.

    DTIC Science & Technology

    SSPO, the largest program office in the Navy and in existence for over 20 years, has perfected time tested financial management procedures which may...serve as a model for the student of program management. This report presents an overview of the SSPO financial management concepts and general

  4. 75 FR 13209 - Proposed Information Collection (Technical Industry Standards) Activity: Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-18

    ... (Technical Industry Standards) Activity: Comment Request AGENCY: Office of Acquisition and Logistics... Industry Standards. OMB Control Number: 2900-0586. Type of Review: Extension of a currently approved collection. Abstract: VAAR provision 852.211-75, Technical Industry Standards, requires items offered for...

  5. Promoting gender parity in basic education: Lessons from a technical cooperation project in Yemen

    NASA Astrophysics Data System (ADS)

    Yuki, Takako; Mizuno, Keiko; Ogawa, Keiichi; Mihoko, Sakai

    2013-06-01

    Many girls are not sent to school in Yemen, despite basic education being free as well as compulsory for all children aged 6-15. Aiming to improve girls' enrolment by increasing parental and community involvement, the Japan International Cooperation Agency (JICA) offered a technical cooperation project in June 2005 called Broadening Regional Initiative for Developing Girls' Education (BRIDGE). Phase 1 of this project ran for three and a half years, piloting a participatory school management model supported by school grants in six districts of the Taiz Governorate in the Southwest of Yemen. To find out how successful this approach has been in a traditional society, the authors of this paper analysed the gender parity index (GPI) of the project's pilot schools. Based on data collected at three points in time (in the initial and final years of the project, and two years after the project's end), their findings suggest that interventions in school management which strongly emphasise girls' education can be effective in improving gender parity rather quickly, regardless of the schools' initial conditions. However, the authors also observe that the pilot schools' post-project performance in terms of gender parity is mixed. While the local government allocated budgets for school grants to all pilot schools even after the project's end, training and monitoring activities were cut back. The authors further observe that the variation in performance appears to be significantly correlated with school leaders' initial perceptions of gender equality and with the number of female teachers employed. These findings point to the importance of providing schools with continuous long-term guidance and of monitoring those which implement school improvement programmes.

  6. Low-Temperature Projects of the Department of Energy's Geothermal Technologies Program: Evaluation and Lessons Learned

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Williams, Tom; Snyder, Neil; Gosnold, Will

    This paper discusses opportunities and challenges related to the technical and economic feasibility of developing power generation from geothermal resources at temperatures of 150 degrees C and lower. Insights from projects funded by the U.S. Department of Energy (DOE), Geothermal Technologies Office inform these discussions and provide the basis for some lessons learned to help guide decisions by DOE and the industry in further developing this resource. The technical basis for low-temperature geothermal energy is well established and the systems can be economic today in certain situations. However, these applications are far from a 'plug and play' product; successful developmentmore » today requires a good knowledge of geothermal system design and operation.« less

  7. The Geographic Information System techniques impact analyze of Office's Properties in Barcelona

    NASA Astrophysics Data System (ADS)

    Garcia, P. A.; Biere, R. A.; Moix, M. B.

    2007-05-01

    The changes in the characteristics and needs in the cities structures means new challenges in the space to the economics activities. The increasing predominance of the tertiary industry, of offices or I+D buildings, like an effect of the economic transformation implies new forms, new technical characteristics and similar alternatives locations accordant with a changing demand. The project that is presented here, is developed by the Centre of Land Policy and Valuations of the University Polytechnic of Catalonia for the company "Servicios de Geo-marketing Inmobiliario S.L.' (SGMI, Real State Geo- marketing Services S.L.) The process consists in the generation of a geographic information system to the analyses of the characteristics office's buildings of Barcelona in the sense to introduce the property office's buildings of Barcelona into a database for the geo-marketing. This application allows the access to the necessary information of technical and constructive characteristics of the office's buildings, summoned by the most emblematic or central locations to the best technical level in their constructions towards facilitating the maximum knowledge the citizen in order to assure the choice according to the needs for every profile of demand. The work has consisted basically in defining the technical criteria of evaluation of the building, to systematize those characteristics in some indicators (variable) capable of expressing the level of quality of every variable, to establish a system measurement of greater to smaller value explained to the quality. Systematizing the collection of information of a total of 683 buildings of Barcelona and of some municipalities of its periphery, through a visit to every building, to process the data obtained to a database and to standardize the value of quality for every indicator and set of indicators towards determining a final qualification, obtained from the different physical, constructive and qualitative characteristics of

  8. Website Policies and Important Links | OSTI, US Dept of Energy Office of

    Science.gov Websites

    Scientific and Technical Information skip to main content Sign In Create Account OSTI.GOV title logo U.S. Department of Energy Office of Scientific and Technical Information Search terms: Advanced to OSTI Websites Linking to Outside Websites Freedom of Information Information Quality No Fear Act

  9. Modeling of Core Competencies in the Registrar's Office

    ERIC Educational Resources Information Center

    Pikowsky, Reta

    2009-01-01

    The Office of the Registrar at the Georgia Institute of Technology, in cooperation with the Office of Human Resources, has been engaged since February 2008 in a pilot project to model core competencies for the leadership team and the staff. It is the hope of the office of Human resources that this pilot will result in a model that can be used…

  10. 34 CFR 403.187 - How may a State provide technical assistance?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false How may a State provide technical assistance? 403.187 Section 403.187 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION STATE VOCATIONAL AND APPLIED TECHNOLOGY EDUCATION...

  11. NASA/DoD Aerospace Knowledge Diffusion Research Project. Paper 29: The US government technical report and the transfer of federally funded aerospace R and D

    NASA Technical Reports Server (NTRS)

    Pinelli, Thomas E.; Barclay, Rebecca O.; Kennedy, John M.

    1993-01-01

    This article discusses the U.S. government technical report and the transfer of federally funded aerospace research and development in a conceptual framework of the federal government as a producer of scientific and technical information. The article summarizes current literature and research and discusses U.S. government technical report use and the importance of using data obtained from the NASA/DoD Aerospace Knowledge Diffusion Research Project. The authors make a case for changing existing U.S. technology policy and present a research agenda for the U.S. government technical report.

  12. Technical Assistance Project Map | State, Local, and Tribal Governments |

    Science.gov Websites

    ), NREL provides research to help stakeholders understand challenges and barriers to the development of offers various types of technical assistance to state and local governments. Clear All Filter by: State (0) All states Year (0) All years Type (0) All types Category (0) All categories Technical Assistance

  13. 44 CFR 65.4 - Right to submit new technical data.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Right to submit new technical... IDENTIFICATION AND MAPPING OF SPECIAL HAZARD AREAS § 65.4 Right to submit new technical data. (a) A community has..., other than those initiatedby FEMA, must be made in writing by the Chief Executive Officer of the...

  14. Office of Management Services 1989 Annual Report.

    ERIC Educational Resources Information Center

    Association of Research Libraries, Washington, DC. Office of Management Studies.

    Designed to serve both as an activity report on Office of Management Services (OMS) progress during 1989 and a catalog of OMS services and products, this annual report focuses on the management of human and technical resources in a scholarly environment. Programs and services are reported in four sections: (1) Applied Research and Development (the…

  15. Supplementing Tribal Culture Using Technical Writing Basics

    ERIC Educational Resources Information Center

    Tichenor, Stuart

    2008-01-01

    Using technical writing basics, a cohort of Lighthorse Police Officers from the Muscogee (Creek) Nation added to their tribe's cultural history by recording part of their family and clan history as well as documenting their law enforcement careers and education.

  16. 48 CFR 1631.205-76 - Trade, business, technical, and professional activity costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Trade, business, technical....205-76 Trade, business, technical, and professional activity costs. (a) FEHBP participating plans, carriers, and underwriters shall seek the advance written approval of the contracting officer for...

  17. Open Archives Initiative (OAI) Services | OSTI, US Dept of Energy Office of

    Science.gov Websites

    Scientific and Technical Information skip to main content Sign In Create Account OSTI.GOV title logo U.S. Department of Energy Office of Scientific and Technical Information Search terms: Advanced Sign In Create Account This page is being shared by OSTI.GOV. Open Archives Initiative (OAI) Services

  18. Seminar for Preparation of Professional Personnel for Vocational-Technical Education. Final Report.

    ERIC Educational Resources Information Center

    Dillon, Roy D.; Horner, James T.

    Seminar participants included college administrative officers, state vocational education directors, vocational-technical teacher educators, and Office of Education staff. The purpose of the June, 1968 seminar was to consider strategies for resolving critical vocational education personnel supply and demand problems. Presentations included in the…

  19. Application of Theory to a Technical Assistance Experiment: Development Communication Theory and the Basic Village Education Project in Guatemala.

    ERIC Educational Resources Information Center

    Kelly, James D.

    This paper attempts to assess the influence of development communication theory on the planning and implementation of technical assistance projects in the Third World that utilize mass communication as an agent of change. Like political development theory, communication theory has often been applied in an ethnocentric manner in less developed…

  20. Commercial Buildings Partnerships - Overview of Higher education projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Parrish, Kristen; Robinson, Alastair; Regnier, Cindy

    2013-02-01

    The Commercial Building Partnership (CBP), a public/private, cost-shared program sponsored by the U.S. Department of Energy (DOE), paired selected commercial building owners and operators with representatives of DOE, its national laboratories, and private-sector technical experts. These teams explored energy-saving measures across building systems – including some considered too costly or technologically challenging – and used advanced energy modeling to achieve peak whole-building performance. Modeling results were then included in new construction or retrofit designs to achieve significant energy reductions. CBP design goals aimed to achieve 50 percent energy savings compared to ANSI/ASHRAE/IES Standard 90.1-2004 for new construction, while retrofits aremore » designed to consume at least 30 percent less energy than either Standard 90.1-2004 or current consumption. After construction and commissioning of the project, laboratory staff continued to work with partners to collect and analyze data for verification of the actual energy reduction. CBP projects represent diverse building types in commercial real estate, including lodging, grocery, retail, higher education, office, and warehouse/storage facilities. Partners also commit to replicating low-energy technologies and strategies from their CBP projects throughout their building portfolios. As a result of CBP projects, five sector overviews (Lodging, Food Sales, General Merchandise, Higher Education, Offices) were created to capture successful strategies and recommended energy efficiency measures that could broadly be applied across these sectors. These overviews are supplemented with individual case studies providing specific details on the decision criteria, modeling results, and lessons learned on specific projects. Sector overviews and CBP case studies will also be updated to reflect verified data and replication strategies as they become available.« less

  1. 7 CFR 2.89 - Chief Information Officer.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... continue, modify, or terminate an information technology program or project. (3) Provide advice and other..., computer conferencing, televideo technologies, and other applications of office automation technology which... technology system project managers in accordance with OMB policies. (iv) Providing recommendations to Agency...

  2. 7 CFR 2.89 - Chief Information Officer.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... continue, modify, or terminate an information technology program or project. (3) Provide advice and other..., computer conferencing, televideo technologies, and other applications of office automation technology which... technology system project managers in accordance with OMB policies. (iv) Providing recommendations to Agency...

  3. Matching Community and Technical College Professional/Technical Education Capacity to Employer Demand. Final Report.

    ERIC Educational Resources Information Center

    Sommers, Paul; Heg, Deena

    A project was conducted to improve the state of Washington's community and technical college system by developing and using an improved occupational forecasting system to assess and respond to education and training needs. First, long-term occupational forecast data from Washington's Employment Security Department were matched with technical and…

  4. An Enrollment Audit of the Public Community and Technical Colleges.

    ERIC Educational Resources Information Center

    Texas State Auditor's Office, Austin.

    An August 1997 report from the Office of the State Auditor, this document contains the results of an enrollment audit of Texas' Public Community and Technical Colleges. It recommends that no adjustments be made to the Public Community and Technical Colleges' 1998-1999 biennial appropriations, due to the fact that the $7.7 million in errors…

  5. Outreach and Technical Assistance Network. Third Year Evaluation Report. February 1, 1992-January 31, 1993. An Adult Education 2000 Project.

    ERIC Educational Resources Information Center

    Hacienda La Puente Unified School District, City of Industry, CA. Outreach and Technical Assistance Network.

    The Outreach and Technical Assistance Network (OTAN) was developed to disseminate resources to California adult educators. During the project's third year, staff development and information services were provided to 321 funded agencies. In collaboration with the Educational Telecommunications Network, OTAN staff organized the Adult Learning…

  6. Low-Temperature Projects of the Department of Energy's Geothermal Technologies Program: Evaluation and Lessons Learned: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Williams, Tom; Snyder, Neil; Gosnold, Will

    This paper discusses opportunities and challenges related to the technical and economic feasibility of developing power generation from geothermal resources at temperatures of 150 degrees C and lower. Insights from projects funded by the U.S. Department of Energy (DOE), Geothermal Technologies Office inform these discussions and provide the basis for some lessons learned to help guide decisions by DOE and the industry in further developing this resource. The technical basis for low-temperature geothermal energy is well established and the systems can be economic today in certain situations. However, these applications are far from a 'plug and play' product; successful developmentmore » today requires a good knowledge of geothermal system design and operation.« less

  7. Technical needs and research opportunities provided by projected aeronautical and space systems

    NASA Technical Reports Server (NTRS)

    Noor, Ahmed K.

    1992-01-01

    The overall goal of the present task is to identify the enabling and supporting technologies for projected aeronautical and space systems. A detailed examination was made of the technical needs in the structures, dynamics and materials areas required for the realization of these systems. Also, the level of integration required with other disciplines was identified. The aeronautical systems considered cover the broad spectrum of rotorcraft; subsonic, supersonic and hypersonic aircraft; extremely high-altitude aircraft; and transatmospheric vehicles. The space systems considered include space transportation systems; spacecrafts for near-earth observation; spacecrafts for planetary and solar exploration; and large space systems. A monograph is being compiled which summarizes the results of this study. The different chapters of the monograph are being written by leading experts from governmental laboratories, industry and universities.

  8. 76 FR 32967 - Proposed Extensions and Waivers: National Early Childhood Technical Assistance Center

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-07

    ... DEPARTMENT OF EDUCATION [CFDA No. 84.326H] Proposed Extensions and Waivers: National Early Childhood Technical Assistance Center AGENCY: Office of Special Education Programs, Office of Special Education and Rehabilitative Services, Department of Education. ACTION: Notice of proposed extension of...

  9. 76 FR 71011 - Reliability Technical Conference Agenda

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-16

    ... Reliability Technical Conference. Docket No. AD12-1-000 North American Electric Docket No. RC11-6-000... Chief Executive Officer, North American Electric Reliability Corporation (NERC) Kevin Burke, Chairman... and Reliability, American Public Power Association (APPA); NERC Standards Committee Chairman Deborah...

  10. Obtaining Technical Support for Superfund, RCRA and Brownfields Site Issues Fact Sheet

    EPA Pesticide Factsheets

    EPA’s Technical Support Centers (TSCs) and other technical support services are available to Regional RemedialProject Managers, Corrective Action Staff, and On-Scene Coordinators needing specialized technical expertisefor specific tasks or projects.

  11. Selected Technical and Economic Comparisons of Synfuel Options

    DOT National Transportation Integrated Search

    1981-04-01

    This study is a comparative technical and economic assessment of selected synfuel technologies. It contains papers written for Office of Technology Assessment (OTA) to assist in preparation of the report "Increased Automobile Fuel Efficiency and Synt...

  12. Procedural Influence on Internal and External Assessment Scores of Undergraduate Vocational and Technical Education Research Projects in Nigerian Universities

    ERIC Educational Resources Information Center

    A. C., John; Manabete, S. S.

    2015-01-01

    This study sought to determine the procedural influence on internal and external assessment scores of undergraduate research projects in vocational and technical education programmes in the university under study. A survey research design was used for the conduct of this study. The population consisted of 130 lecturers and 1,847 students in the…

  13. SIMBIOS Project

    NASA Technical Reports Server (NTRS)

    Fargion, Giulietta S.; McClain, Charles R.; Busalacchi, Antonio J. (Technical Monitor)

    2001-01-01

    The purpose of this technical report is to provide current documentation of the Sensor Intercomparison and Merger for Biological and Interdisciplinary Oceanic Studies (SIMBIOS) Project activities, NASA Research Announcement (NRAI) research status, satellite data processing, data product validation, and field calibration. This documentation is necessary to ensure that critical information is related to the scientific community and NASA management. This critical information includes the technical difficulties and challenges of validating and combining ocean color data from an array of independent satellite systems to form consistent and accurate global bio-optical time series products. This technical report is not meant as a substitute for scientific literature. Instead, it will provide a ready and responsive vehicle for the multitude of technical reports issued by an operational project.

  14. DOE scientific and technical information management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Beasly, M.

    The objective of this paper was a discussion of the mission objectives and program activities of the DOE Office of Scientific and Technical Information. Topics of discussion were: (1) program direction and structure; (2) representation in gov`t and international organizations; (3) management of information; and (4) consultation and assistance.

  15. OCLC Office of Research Scholarly Service.

    ERIC Educational Resources Information Center

    Crook, Mark A.

    This report briefly describes the background, software, tools used, and future directions of the Scholarly Services project which began in 1987 in the OCLC Office of Research. Several selected projects are reviewed to illustrate how sample data are extracted from the OCLC Online Union Catalog to support scholars in their research endeavors. The…

  16. 5 CFR 470.311 - Final project approval.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration Projects § 470.311 Final project approval. (a) The Office of Personnel Management will consider all timely...) The Office of Personnel Management shall provide a copy of the final version of the project plan to...

  17. The integrated scheduling system: A case study in project management

    NASA Technical Reports Server (NTRS)

    Bishop, Peter C.; Learned, David B.; Yoes, Cissy A.

    1989-01-01

    A prototype project management system was developed for the Level III Project Office for the Space Station Freedom. The main goal was to establish a framework for the Space Station Project Office whereby Project and Office Managers can jointly establish and review scheduled milestones and activities. The objective was to assist office managers in communicating their objectives, milestones, schedules, and other project information more effectively and efficiently. Consideration of sophisticated project management systems was included, but each of the systems had limitations in meeting the stated objectives.

  18. 48 CFR 2131.205-43 - Trade, business, technical and professional activity costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Trade, business, technical... Organizations 2131.205-43 Trade, business, technical and professional activity costs. (a) FEGLI Program contractors shall seek the advance written approval of the contracting officer for allowability of all or part...

  19. Electrical engineering research support for FDOT Traffic Statistics Office

    DOT National Transportation Integrated Search

    2010-03-01

    The aim of this project was to provide electrical engineering support for the telemetered traffic monitoring sites (TTMSs) operated by the Statistics Office of the Florida Department of Transportation. This project was a continuation of project BD-54...

  20. 48 CFR 315.306 - Exchanges with offerors after receipt of proposals.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... establishment of the competitive range. The Project Officer or technical evaluation panel shall develop technical questions as part of the technical evaluation report. The questions shall disclose the ambiguities... practicable, all questions and answers shall be in writing. The Contracting Officer shall give each offeror in...

  1. Designation of Contracting Officers Representatives and Oversight Framework Could Be Improved for Contracts in Afghanistan

    DTIC Science & Technology

    2016-08-30

    certifying official in the certification of vouchers for payment. 21 U.S. Office of Government Ethics Form 450, “Confidential Financial Disclosure Report...contracting officer to perform specific technical or administrative functions for Government contracts. We performed this audit in response to a...February 2015 U.S. Forces−Afghanistan policy memorandum requesting the DoD Office of Inspector General to review COR performance in the Combined

  2. Technical assistance for law-enforcement communications: Grant summary

    NASA Technical Reports Server (NTRS)

    Reilly, N. B.

    1979-01-01

    A summary overview of project activities and results are presented. The goals and objectives are reviewed and a description of the approaches used to attain them is given. The feedback received from the seminars conducted as part of the project, and results from a questionnaire about the project are included. Significant findings of the project in such areas as radio channel loading, dispatch system design, training and technology transfer are discussed. Several specific problem areas are identified and evaluated. Specific recommendations for future technical assistance efforts are presented along with an inventory of technical-assistance reports generated throughout the project.

  3. Improving a health information system for real-time data entries: An action research project using socio-technical systems theory.

    PubMed

    Adaba, Godfried Bakiyem; Kebebew, Yohannes

    2018-03-01

    This paper presents the findings of an action research (AR) project to improve a health information system (HIS) at the Operating Theater Department (OTD) of a National Health Service (NHS) hospital in South East England, the UK. Informed by socio-technical systems (STS) theory, AR was used to design an intervention to enhance an existing patient administration system (PAS) to enable data entries in real time while contributing to the literature. The study analyzed qualitative data collected through interviews, participant observations, and document reviews. The study found that the design of the PAS was unsuitable to the work of the three units of the OTD. Based on the diagnoses and STS theory, the project developed and implemented a successful intervention to enhance the legacy system for data entries in real time. The study demonstrates the value of AR from a socio-technical perspective for improving existing systems in healthcare settings. The steps adopted in this study could be applied to improve similar systems. A follow-up study will be essential to assess the sustainability of the improved system.

  4. 25 CFR 1200.40 - How will the Department provide technical assistance for tribes?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... tribes? 1200.40 Section 1200.40 Indians OFFICE OF THE SPECIAL TRUSTEE FOR AMERICAN INDIANS, DEPARTMENT OF... the Department provide technical assistance for tribes? (a) We will provide direct or contract technical assistance, in accordance with appropriations availability to tribes for developing, implementing...

  5. 75 FR 28857 - Agency Information Collection (Technical Industry Standards) Activities Under OMB Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-24

    ... (Technical Industry Standards) Activities Under OMB Review AGENCY: Office of Acquisition and Logistics... Industry Standards. OMB Control Number: 2900-0586. Type of Review: Extension of a currently approved collection. Abstract: VAAR provision 852.211-75, Technical Industry Standards, requires that items offered...

  6. Technical area status report for waste destruction and stabilization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dalton, J.D.; Harris, T.L.; DeWitt, L.M.

    1993-08-01

    The Office of Environmental Restoration and Waste Management (EM) was established by the Department of Energy (DOE) to direct and coordinate waste management and site remediation programs/activities throughout the DOE complex. In order to successfully achieve the goal of properly managing waste and the cleanup of the DOE sites, the EM was divided into five organizations: the Office of Planning and Resource Management (EM-10); the Office of Environmental Quality Assurance and Resource Management (EM-20); the Office of Waste Operations (EM-30); the Office of Environmental Restoration (EM-40); and the Office of Technology and Development (EM-50). The mission of the Office ofmore » Technology Development (OTD) is to develop treatment technologies for DOE`s operational and environmental restoration wastes where current treatment technologies are inadequate or not available. The Mixed Waste Integrated Program (MWIP) was created by OTD to assist in the development of treatment technologies for the DOE mixed low-level wastes (MLLW). The MWIP has established five Technical Support Groups (TSGs) whose purpose is to identify, evaluate, and develop treatment technologies within five general technical areas representing waste treatment functions from initial waste handling through generation of final waste forms. These TSGs are: (1) Front-End Waste Handling, (2) Physical/Chemical Treatment, (3) Waste Destruction and Stabilization, (4) Second-Stage Destruction and Offgas Treatment, and (5) Final Waste Forms. This report describes the functions of the Waste Destruction and Stabilization (WDS) group. Specifically, the following items are discussed: DOE waste stream identification; summary of previous efforts; summary of WDS treatment technologies; currently funded WDS activities; and recommendations for future activities.« less

  7. 25 CFR 1200.44 - What action will the Department take on requests for technical assistance?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... technical assistance? 1200.44 Section 1200.44 Indians OFFICE OF THE SPECIAL TRUSTEE FOR AMERICAN INDIANS, DEPARTMENT OF THE INTERIOR AMERICAN INDIAN TRUST FUND MANAGEMENT REFORM ACT Technical Assistance § 1200.44 What action will the Department take on requests for technical assistance? We will respond in writing...

  8. The GEOFAR Project - Geothermal Finance and Awareness in Europeans Regions - Development of new schemes to overcome non-technical barriers, focusing particularly on financial barriers

    NASA Astrophysics Data System (ADS)

    Poux, Adeline; Wendel, Marco; Jaudin, Florence; Hiegl, Mathias

    2010-05-01

    Numerous advantages of geothermal energy like its widespread distribution, a base-load power and availability higher than 90%, a small footprint and low carbon emissions, and the growing concerns about climate changes strongly promote the development of geothermal projects. Geothermal energy as a local energy source implies needs on surface to be located close to the geothermal resource. Many European regions dispose of a good geothermal potential but it is mostly not sufficiently developed due to non-technical barriers occurring at the very early stages of the project. The GEOFAR Project carried out within the framework of EU's "Intelligent Energy Europe" (IEE) program, gathers a consortium of European partners from Germany, France, Greece, Spain and Portugal. Launched in September 2008, the aim of this research project is to analyze the mentioned non-technical barriers, focusing most particularly on economic and financial aspects. Based on this analysis GEOFAR aims at developing new financial and administrative schemes to overcome the main financial barriers for deep geothermal projects (for electricity and direct use, without heat pumps). The analysis of the current situation and the future development of geothermal energy in GEOFAR target countries (Germany, France, Greece, Spain, Portugal, Slovakia, Bulgaria and Hungary) was necessary to understand and expose the diverging status of the geothermal sector and the more and less complicated situation for geothermal projects in different Europeans Regions. A deeper analysis of 40 cases studies (operating, planned and failed projects) of deep geothermal projects also contributed to this detailed view. An exhaustive analysis and description of financial mechanisms already existing in different European countries and at European level to support investors completed the research on non-technical barriers. Based on this profound analysis, the GEOFAR project has made an overview of the difficulties met by project

  9. 42 CFR 56.703 - Project elements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SERVICES Grants for Technical Assistance § 56.703 Project elements. A project for the provision of technical assistance to migrant health centers and entities which intend to become migrant health centers... the grant award, such technical and other nonfinancial assistance (such as fiscal and program...

  10. NASA/DoD Aerospace Knowledge Diffusion Research Project. XXXIII - Technical communications practices and the use of information technologies as reported by Dutch and U.S. aerospace engineers

    NASA Technical Reports Server (NTRS)

    Barclay, Rebecca O.; Pinelli, Thomas E.; Tan, Axel S. T.; Kennedy, John M.

    1993-01-01

    As part of Phase 4 of the NASA/DOD Aerospace Knowledge Diffusion Research Project, two studies were conducted that investigated the technical communications practices of Dutch and U.S. aerospace engineers and scientists. A self-administered questionnaire was distributed to aerospace engineers and scientists at the National Aerospace Laboratory (The Netherlands), and NASA Ames Research Center (U.S.), and the NASA Langley Research Center (U.S.). This paper presents responses of the Dutch and U.S. participants to selected questions about four of the seven project objectives: determining the importance of technical communications to aerospace engineering professionals, investigating the production of technical communications, examining the use and importance of computer and information technology, and exploring the use of electronic networks.

  11. The Role of the Project Management Office on Information Technology Project Success

    ERIC Educational Resources Information Center

    Stewart, Jacob S.

    2010-01-01

    The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. Assessing critical success factors is another…

  12. Webinar May 17: Fuel Cell Electric Bus Progress Toward Meeting Technical

    Science.gov Websites

    Targets | News | NREL Webinar May 17: Fuel Cell Electric Bus Progress toward Meeting Technical Targets Webinar May 17: Fuel Cell Electric Bus Progress toward Meeting Technical Targets May 14, 2018 The U.S. Department of Energy's (DOE's) Fuel Cell Technologies Office will present a live webinar titled

  13. 77 FR 74658 - Texas Eastern Transmission, LP; Notice of Technical Conference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-17

    ...-captioned proceeding \\1\\ directed that a technical conference be held to address issues raised by Texas... adjustments. \\1\\ Texas Eastern Transmission, LP, 141 FERC ]61,172 (2012). Take notice that a technical conference will be held on Tuesday, January 15, 2013 at 9:30 a.m., in a room to be designated at the offices...

  14. 2015 DOE Vehicle Technologies Office Annual Merit Review

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    The 2015 U.S. Department of Energy (DOE) Fuel Cell Technologies Office (FCTO) and Vehicle Technologies Office (VTO) Annual Merit Review and Peer Evaluation Meeting (AMR) was held June 8-12, 2015, in Arlington, Virginia. The review encompassed all of the work done by the FCTO and the VTO: 258 individual activities were reviewed for VTO, by 170 reviewers. A total of 1,095 individual review responses were received for the VTO technical reviews. The objective of the meeting was to review the accomplishments and plans for VTO over the previous 12 months, and provide an opportunity for industry, government, and academia tomore » give inputs to DOE on the Office with a structured and formal methodology. The meeting also provided attendees with a forum for interaction and technology information transfer.« less

  15. 2013 Building Technologies Office Program Peer Review Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    none,

    2013-11-01

    The 2013 Building Technologies Office Program Peer Review Report summarizes the results of the 2013 Building Technologies Office (BTO) peer review, which was held in Washington, D.C., on April 2–4, 2013. The review was attended by over 300 participants and included presentations on 59 BTO-funded projects: 29 from BTO’s Emerging Technologies Program, 20 from the Commercial Buildings Integration Program, 6 from the Residential Buildings Integration Program, and 4 from the Building Energy Codes Program. This report summarizes the scores and comments provided by the independent reviewers for each project.

  16. Office of Indian Affairs Progress Report, June 1977, State of New Mexico.

    ERIC Educational Resources Information Center

    New Mexico State Commission on Indian Affairs, Santa Fe.

    Included in this report on the New Mexico Office of Indian Affairs are brief sections dealing with: the Agency's background; past projects and future goals; the Research and Statistics Center; projects under consideration; and the Agency's Tribal Liaison Officer, Tribal Relations Specialist; and Planner. Cited as major Agency accomplishments…

  17. MicroBooNE project team recognized by Department of Energy | News

    Science.gov Websites

    Financial Officer Finance Section Office of the Chief Operating Officer Facilities Engineering Services Accelerator Division Accelerator Physics Center Office of the Chief Safety Officer Environment, Safety, Health and Quality Section Office of the Chief Project Officer Office of Project Support Services Office of

  18. Office of Interdisciplinary Health Studies Education, East Carolina university.

    PubMed

    Greer, Annette G; Clay, Maria C

    2010-01-01

    The Office of Interdisciplinary Health Sciences Education resides organizationally within East Carolina University (ECU), Division of Health Sciences; ECU established this office in 1999. The mission of the office is fivefold: 1. promote the expansion of interdisciplinary training within and between Health Sciences and other health-related programs on campus; 2. promote innovative research opportunities across disciplines, in particular, projects regarding interdisciplinary health sciences education; 3. serve as a clearinghouse for information relative to existing and planned interdisciplinary activities and projects within the Division; 4. collaborate with units, and communities in establishing community partnerships for interdisciplinary rural health training; and 5. identify core curricular content across health-related disciplines, minimizing curricular redundancy while promoting interdisciplinary collaboration.

  19. 75 FR 9608 - National Protection and Programs Directorate; Technical Assistance Request and Evaluation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-03

    ... Directorate; Technical Assistance Request and Evaluation AGENCY: National Protection and Programs Directorate... assistance requests from each State and territory. OEC will use the Technical Assistance Evaluation Form to... electronically. Evaluation forms may be submitted electronically or in paper form. The Office of Management and...

  20. TurboTech Technical Evaluation Automated System

    NASA Technical Reports Server (NTRS)

    Tiffany, Dorothy J.

    2009-01-01

    TurboTech software is a Web-based process that simplifies and semiautomates technical evaluation of NASA proposals for Contracting Officer's Technical Representatives (COTRs). At the time of this reporting, there have been no set standards or systems for training new COTRs in technical evaluations. This new process provides boilerplate text in response to interview style questions. This text is collected into a Microsoft Word document that can then be further edited to conform to specific cases. By providing technical language and a structured format, TurboTech allows the COTRs to concentrate more on the actual evaluation, and less on deciding what language would be most appropriate. Since the actual word choice is one of the more time-consuming parts of a COTRs job, this process should allow for an increase in quantity of proposals evaluated. TurboTech is applicable to composing technical evaluations of contractor proposals, task and delivery orders, change order modifications, requests for proposals, new work modifications, task assignments, as well as any changes to existing contracts.

  1. Leveraging Independent Management and Chief Engineer Hierarchy: Vertically and Horizontally-Derived Technical Authority Value

    NASA Technical Reports Server (NTRS)

    Barley, Bryan; Newhouse, Marilyn

    2012-01-01

    In the development of complex spacecraft missions, project management authority is usually extended hierarchically from NASA's highest agency levels down to the implementing institution's project team level, through both the center and the program. In parallel with management authority, NASA utilizes a complementary, but independent, hierarchy of technical authority (TA) that extends from the agency level to the project, again, through both the center and the program. The chief engineers (CEs) who serve in this technical authority capacity oversee and report on the technical status and ensure sound engineering practices, controls, and management of the projects and programs. At the lowest level, implementing institutions assign project CEs to technically engage projects, lead development teams, and ensure sound technical principles, processes, and issue resolution. At the middle level, programs and centers independently use CEs to ensure the technical success of their projects and programs. At the agency level, NASA's mission directorate CEs maintain technical cognizance over every program and project in their directorate and advise directorate management on the technical, cost, schedule, and programmatic health of each. As part of this vertically-extended CE team, a program level CE manages a continually varying balance between penetration depth and breadth across his or her assigned missions. Teamwork issues and information integration become critical for management at all levels to ensure value-added use of both the synergy available between CEs at the various agency levels, and the independence of the technical authority at each organization.

  2. A Career Development Guide for Administrative Officers

    DTIC Science & Technology

    1984-03-01

    PROJECT, TASK AREA 6 WORK UNIT NUMBERS ACSC/EDCC MAXWELL AFB AL 36112 I I. CONTROLLING OFFICE NAME AND ADDRESS 12 . REPORT DATE ACSC/EDCC March 1984... 12 Administrative Positions.................................... 12 Squadron Administrative Officer........................ 12 Executive...Captain to Major - 6 to 11 Years....................... 49 .ajor to Lieutenant Colonel - 12 to 17 Years..........5 Lieutenant Colonel to 0-6 (or beyond

  3. 76 FR 21043 - Notice of Public Meeting: Technical Aspects of Mandatory Deposit of Published Electronic Works...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-14

    ... LIBRARY OF CONGRESS Copyright Office [Docket No. 2011-3] Notice of Public Meeting: Technical... Office, Library of Congress. ACTION: Notice of public meeting. SUMMARY: The U.S. Copyright Office of the Library of Congress will host a public meeting on May 24, 2011, with members of the publishing community...

  4. Flat-plate solar array project. Volume 8: Project analysis and integration

    NASA Technical Reports Server (NTRS)

    Mcguire, P.; Henry, P.

    1986-01-01

    Project Analysis and Integration (PA&I) performed planning and integration activities to support management of the various Flat-Plate Solar Array (FSA) Project R&D activities. Technical and economic goals were established by PA&I for each R&D task within the project to coordinate the thrust toward the National Photovoltaic Program goals. A sophisticated computer modeling capability was developed to assess technical progress toward meeting the economic goals. These models included a manufacturing facility simulation, a photovoltaic power station simulation and a decision aid model incorporating uncertainty. This family of analysis tools was used to track the progress of the technology and to explore the effects of alternative technical paths. Numerous studies conducted by PA&I signaled the achievement of milestones or were the foundation of major FSA project and national program decisions. The most important PA&I activities during the project history are summarized. The PA&I planning function is discussed and how it relates to project direction and important analytical models developed by PA&I for its analytical and assessment activities are reviewed.

  5. Technical Writing in Hydrogeology.

    ERIC Educational Resources Information Center

    Tinker, John R., Jr.

    1986-01-01

    A project for Writing Across the Curriculum at the University of Wisconsin-Eau Claire is described as a method to relate the process of writing to the process of learning hydrology. The project focuses on an actual groundwater contamination case and is designed to improve the technical writing skills of students. (JN)

  6. 34 CFR 366.10 - What agencies are eligible for assistance to provide training and technical assistance?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... training and technical assistance? 366.10 Section 366.10 Education Regulations of the Offices of the... EDUCATION CENTERS FOR INDEPENDENT LIVING Training and Technical Assistance § 366.10 What agencies are eligible for assistance to provide training and technical assistance? Entities that have experience in the...

  7. 34 CFR 366.11 - What financial assistance does the Secretary provide for training and technical assistance?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... for training and technical assistance? 366.11 Section 366.11 Education Regulations of the Offices of..., DEPARTMENT OF EDUCATION CENTERS FOR INDEPENDENT LIVING Training and Technical Assistance § 366.11 What financial assistance does the Secretary provide for training and technical assistance? (a) From funds, if...

  8. An Integrated Approach to Exploration Launch Office Requirements Development

    NASA Technical Reports Server (NTRS)

    Holladay, Jon B.; Langford, Gary

    2006-01-01

    The proposed paper will focus on the Project Management and Systems Engineering approach utilized to develop a set of both integrated and cohesive requirements for the Exploration Launch Office, within the Constellation Program. A summary of the programmatic drivers which influenced the approach along with details of the resulting implementation will be discussed as well as metrics evaluating the efficiency and accuracy of the various requirements development activities. Requirements development activities will focus on the procedures utilized to ensure that technical content was valid and mature in preparation for the Crew Launch Vehicle and Constellation System s Requirements Reviews. This discussion will begin at initial requirements development during the Exploration Systems Architecture Study and progress through formal development of the program structure. Specific emphasis will be given to development and validation of the requirements. This discussion will focus on approaches to garner the appropriate requirement owners (or customers), project infrastructure utilized to emphasize proper integration, and finally the procedure to technically mature, verify and validate the requirements. Examples of requirements being implemented on the Launch Vehicle (systems, interfaces, test & verification) will be utilized to demonstrate the various processes and also provide a top level understanding of the launch vehicle(s) performance goals. Details may also be provided on the approaches for verification, which range from typical aerospace hardware development (qualification/acceptance) through flight certification (flight test, etc.). The primary intent of this paper is to provide a demonstrated procedure for the development of a mature, effective, integrated set of requirements on a complex system, which also has the added intricacies of both heritage and new hardware development integration. Ancillary focus of the paper will include discussion of Test and

  9. Completion of Launch Director Console Project and Other Support Work

    NASA Technical Reports Server (NTRS)

    Steinrock, Joshua G.

    2018-01-01

    There were four projects that I was a part of working on during the spring semester of 2018. This included the completion of the Launch Director Console (LDC) project and the completion and submission of a Concept of Operations (ConOps) document for the Record and Playback System (RPS) at the Launch Control Center (LCC), as well as supporting the implementation of a unit in RPS known as the CDP (Communication Data Processor). Also included was my support and mentorship of a High School robotics team that is sponsored by Kennedy Space Center. The LDC project is an innovative workstation to be used by the launch director for the future Space Launch System program. I worked on the fabrication and assembly of the final console. The ConOps on RPS is a technical document for which I produced supporting information and notes. All of this was done in the support of the IT Project Management Office (IT-F). The CDP is a subsystem that will eventually be installed in and operated by RPS.

  10. Recruiting physicians for office-based research.

    PubMed

    Levinson, W; Dull, V T; Roter, D L; Chaumeton, N; Frankel, R M

    1998-06-01

    Research conducted in community outpatient offices can provide insight into the common experiences of patients and physicians. However, recruiting physicians to participate in office-based research is challenging and few descriptions of methods that have been used to successfully recruit random samples of physicians are available. This article describes recruitment strategies utilized in a project that achieved high rates of participation from community-based primary care physicians and surgeons. Recruitment methods included the use of advisory boards to identify potential barriers to participation, use of respected members of the medical community as recruiters, and obtaining endorsements from physician organizations and prominent members of the medical community. Overall, 81% of physicians contacted from a sample frame agreed to participate in the project. Participating physicians most frequently reported that they participated because the project could provide them with feedback about their interviewing style. The recruitment methods described here can be generalized to other types of investigations.

  11. Management of the Cs/Sr Capsule Project at the Hanford Site. Technology Readiness Assessment Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    The Federal Project Director (FPD) for the U.S. Department of Energy (DOE), Richland Operations Office (RL) Waste Management and D&D Division (WMD) requested a Technology Readiness Assessment (TRA) for the Management of the Cesium/Strontium Capsule Storage Project (MCSCP) at the Waste Encapsulation and Storage Facility (WESF) on the Hanford Site in Washington State. The MCSCP CD-1 TRA was performed by a team selected in collaboration between the Office of Environmental Management (EM) Chief Engineer (EM-3.3) and RL, WMD FPD. The TRA Team included subject matter and technical experts having experience in cask storage, process engineering, and system design who weremore » independent of the MCSCP, and the team was led by the Director of Operations and Processes from the EM Chief Engineer's Office (EM-3.32). Movement of the Cs/Sr capsules to dry storage, based on information from the conceptual design, involves (1) capsule packaging, (2) capsule transfer, and (3) capsule storage. The project has developed a conceptual process, described in 30059-R-02, "NAC Conceptual Design Report for the Management of the Cesium and Strontium Capsules Project", which identifies the five major activities in the process to complete the transfer from storage pool to pad-mounted cask storage. The process, shown schematically in Figure 1, is comprised of the following process steps: (1) loading capsules into the UCS; (2) UCS processing; (3) UCS insertion into the TSC Basket; (4) cask transport from WESF to CSA and (5) extended storage at the CSA.« less

  12. Renovating Interior Office Space: What a Manager Needs To Consider.

    ERIC Educational Resources Information Center

    Babey, Evelyn R.

    When planning an office renovation, a manager should design an office layout that is efficient and should consider the psychological aspects of office design, including sound level, color harmony, and lighting. The manager must also have a good understanding of all phases of the project plan and the timing involved. There are basically five phases…

  13. An Introduction to ESERO-UK, the UK Space Education Office

    ERIC Educational Resources Information Center

    Clements, Allan; Mather, Edward

    2012-01-01

    This article introduces the UK branch of the European Space Education Resource Office (ESERO-UK), also known as the UK Space Education Office. It is a teaching project designed to use space to enthuse primary and secondary students to study science, technology, engineering and mathematics (STEM) subjects. The office is funded by the European Space…

  14. Manpower Projection Model Project, Ventura County.

    ERIC Educational Resources Information Center

    Van Zant, John L.; Lawson, William H.

    The final report on Phase 1 of the Manpower Projection Model (MPM) Project provides a guide for implementation of the model system by area Vocational Education Practitioners within any Standard Metropolitan Statistical Area (SMSA). A cooperative effort between Ventura County Superintendent of Schools Office and the Community College District, the…

  15. 76 FR 31356 - Notice of Proposed Information Collection for Public Comment; Technical Assistance Experience...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-31

    ... Matrices AGENCY: Office of the Community Planning and Development. ACTION: Notice of proposed information..., Expertise, and Awards Received Matrices. Description of the need for the information proposed: The Technical Assistance Experience, Expertise, and Awards Received Matrices will allow the Office of Special Needs...

  16. Ice-On-Coil Diurnal Ice Storage Cooling System for a Barracks/Office/ Dining Hall Facility at Yuma Proving Ground, AZ

    DTIC Science & Technology

    1990-09-01

    Kedl is associated with the Oak Ridge National Laboratory ( ORNL ). The technical editor was Gloria J. Wienke, Information Management Office, USACERL. COL...of a DIS cooling system for Building 506, a barracks/ office/dining facility. Oak Ridge National Laboratory ( ORNL ) designed the system in cooperation... ORNL with assistance from YPG and analyzed by USACERL. R.J. Kedl and C.W. Sohn, As.vsment of Energy Storage Technologies for Army Facilities, Technical

  17. Technical Assistance and Changes in Nutrition and Physical Activity Practices in the National Early Care and Education Learning Collaboratives Project, 2015-2016.

    PubMed

    Chiappone, Alethea; Smith, Teresa M; Estabrooks, Paul A; Rasmussen, Cristy Geno; Blaser, Casey; Yaroch, Amy L

    2018-04-26

    The National Early Care and Education Learning Collaboratives Project (ECELC) aims to improve best practices in early care and education (ECE) programs in topic areas of the Nutrition and Physical Activity Self-Assessment in Child Care (NAP SACC). Technical assistance is a component of the ECELC, yet its effect on outcomes is unclear. Beyond dose and duration of technical assistance, limited research exists on characteristics of technical assistance that contribute to outcomes. The objective of this study was to identify and describe technical assistance characteristics and explore associations with NAP SACC outcomes. We collected data from 10 collaboratives comprising 84 ECE programs in 2 states in 2015-2016. The objective of technical assistance was to support programs in improving best practices. Technical assistance was provided to programs via on-site, telephone, or email and was tailored to program needs. We used a mixed-methods design to examine associations between technical assistance and NAP SACC outcomes. We used multiple regression analysis to assess quantitative data and qualitative comparative analysis to determine necessary and sufficient technical assistance conditions supporting NAP SACC outcomes. We also conducted a document review to describe technical assistance that referred conditions identified by the qualitative comparative analysis. Regression analyses detected an inverse relationship between changes in NAP SACC scores and hours of technical assistance. No clear pattern emerged in the qualitative comparative analysis, leaving no necessary and sufficient conditions. However, the qualitative comparative analysis identified feedback as a potentially important component of technical assistance, whereas resource sharing and frequent email were characteristics that seemed to reduce the likelihood of improved outcomes. Email and resource sharing were considered primarily general information rather than tailored technical assistance. Technical

  18. Project Based Learning experiences in the space engineering education at Technical University of Madrid

    NASA Astrophysics Data System (ADS)

    Rodríguez, Jacobo; Laverón-Simavilla, Ana; del Cura, Juan M.; Ezquerro, José M.; Lapuerta, Victoria; Cordero-Gracia, Marta

    2015-10-01

    This work describes the innovation activities performed in the field of space education since the academic year 2009/10 at the Technical University of Madrid (UPM), in collaboration with the Spanish User Support and Operations Center (E-USOC), the center assigned by the European Space Agency (ESA) in Spain to support the operations of scientific experiments on board the International Space Station. These activities have been integrated within the last year of the UPM Aerospace Engineering degree. A laboratory has been created, where students have to validate and integrate the subsystems of a microsatellite using demonstrator satellites. In parallel, the students participate in a Project Based Learning (PBL) training process in which they work in groups to develop the conceptual design of a space mission. One student in each group takes the role of project manager, another one is responsible for the mission design and the rest are each responsible for the design of one of the satellite subsystems. A ground station has also been set up with the help of students developing their final thesis, which will allow future students to perform training sessions and learn how to communicate with satellites, how to receive telemetry and how to process the data. Several surveys have been conducted along two academic years to evaluate the impact of these techniques in engineering learning. The surveys evaluate the acquisition of specific and generic competences, as well as the students' degree of satisfaction with respect to the use of these learning methodologies. The results of the surveys and the perception of the lecturers show that PBL encourages students' motivation and improves their results. They not only acquire better technical training, but also improve their transversal skills. It is also pointed out that this methodology requires more dedication from lecturers than traditional methods.

  19. Technical Communication Competence and Projected Teacher Success.

    ERIC Educational Resources Information Center

    Powers, William G.; Lowry, David N.

    Technical Communication Competence (TCC)is the competence involved in communicating mental images to others in such a manner as to result in their constructing comparable mental images, a process similar to the primary task demanded of teachers at all levels. In a study designed to discover the extent to which a positive relationship existed…

  20. The software analysis project for the Office of Human Resources

    NASA Technical Reports Server (NTRS)

    Tureman, Robert L., Jr.

    1994-01-01

    There were two major sections of the project for the Office of Human Resources (OHR). The first section was to conduct a planning study to analyze software use with the goal of recommending software purchases and determining whether the need exists for a file server. The second section was analysis and distribution planning for retirement planning computer program entitled VISION provided by NASA Headquarters. The software planning study was developed to help OHR analyze the current administrative desktop computing environment and make decisions regarding software acquisition and implementation. There were three major areas addressed by the study: current environment new software requirements, and strategies regarding the implementation of a server in the Office. To gather data on current environment, employees were surveyed and an inventory of computers were produced. The surveys were compiled and analyzed by the ASEE fellow with interpretation help by OHR staff. New software requirements represented a compilation and analysis of the surveyed requests of OHR personnel. Finally, the information on the use of a server represents research done by the ASEE fellow and analysis of survey data to determine software requirements for a server. This included selection of a methodology to estimate the number of copies of each software program required given current use and estimated growth. The report presents the results of the computing survey, a description of the current computing environment, recommenations for changes in the computing environment, current software needs, management advantages of using a server, and management considerations in the implementation of a server. In addition, detailed specifications were presented for the hardware and software recommendations to offer a complete picture to OHR management. The retirement planning computer program available to NASA employees will aid in long-range retirement planning. The intended audience is the NASA civil