  1. 10-MWe solar-thermal central-receiver pilot plant, solar-facilities design integration: plant-support subsystem procurement documentation (RADL Item 7-44D)

    SciTech Connect

    Not Available

    1980-09-01

    Purchase specifications are given for the specific long lead items to be procured for the 10 MWe Solar Pilot Plant. The hardware is grouped into two categories: 480 Volt Load Center and 480 Volt Motor Control Centers; and Power, Control and Instrumentation Cable. The purchase orders for each procurement are included. Need dates for each item are identified. (LEW)

  2. Software/firmware design specification for 10-MWe solar-thermal central-receiver pilot plant

    SciTech Connect

    Ladewig, T.D.

    1981-03-01

    The software and firmware employed for the operation of the Barstow Solar Pilot Plant are completely described. The systems allow operator control of up to 2048 heliostats, and include the capability of operator-commanded control, graphic displays, status displays, alarm generation, system redundancy, and interfaces to the Operational Control System, the Data Acquisition System, and the Beam Characterization System. The requirements are decomposed into eleven software modules for execution in the Heliostat Array Controller computer, one firmware module for execution in the Heliostat Field Controller microprocessor, and one firmware module for execution in the Heliostat Controller microprocessor. The design of the modules to satisfy requirements, the interfaces between the computers, the software system structure, and the computers in which the software and firmware will execute are detailed. The testing sequence for validation of the software/firmware is described. (LEW)

  3. The 10 MWe Solar Thermal Central Receiver Pilot Plant: Solar facilities design integration. Pilot-plant station manual (RADL Item 2-1). Volume 1: System description

    NASA Astrophysics Data System (ADS)

    1982-09-01

    The complete Barstow Solar Pilot Plant is described. The plant requirements and general description are presented, the mechanical, electric power, and control and instrumentation systems as well as civil engineering and structural aspects and the station buildings are described. Included in the mechanical systems are the heliostats, receiver, thermal storage system, beam characterization system, steam, water, nitrogen, and compressed air systems, chemical feed system, fire protection system, drains, sumps and the waste disposal systems, and heating, ventilating, and air conditioning systems.

  4. Heliostat washing equipment requirements (RADL Item 7-17). 10-MWe solar-thermal central-receiver pilot plant: solar facilities design integration

    SciTech Connect

    Not Available

    1982-09-01

    The requirements for washing heliostats at the Barstow Solar Pilot Plant are established. The major objectives are to determine the requirements for an economically feasible technique that is both environmentally acceptable and effective in removing desert soil from the heliostat surfaces in order to achieve cost effective mirror reflectivity. Three candidate systems are outlined and their costs compared. (LEW)

  5. Receiver subsystem analysis report (RADL Item 4-1). 10-MWe Solar Thermal Central-Receiver Pilot Plant: solar-facilities design integration

    SciTech Connect

    Not Available

    1982-04-01

    The results are presented of those thermal hydraulic, structural, and stress analyses required to demonstrate that the Receiver design for the Barstow Solar Pilot Plant will satisfy the general design and performance requirements during the plant's design life. Recommendations resulting from those analyses and supporting test programs are presented regarding operation of the receiver. The analyses are limited to receiver subsystem major structural parts (primary tower, receiver unit core support structure), pressure parts (absorber panels, feedwater, condensate and steam piping/components, flash tank, and steam mainfold) and shielding. (LEW)

  6. Integrated (operational) piping and instrumentation diagrams (RADL item 2-38). 10-MWe solar-thermal central-receiver pilot plant, solar-facilities design integration

    SciTech Connect

    Not Available

    1981-06-01

    Included in this drawing set are: composite operational piping and instrumentation diagrams for the overall plant, for the receiver system, for the thermal storage system, and for the electrical power generation system; receiver preheat panel feedwater; receiver boiler panels, main steam manifold, GN/sub 2/ and drain systems; thermal storage system oil, steam and condensate systems and ullage and maintenance unit; steam system; turbine system; feedwater and condensate system; condenser and condensate drains; equipment cooling water system; circulating water system; sumps and drains; turbine control oil and lube oil system; sampling system; condensate polishing system; service water system; water treatment system; fire protection system; instrument air and service air system; and miscellaneous systems. (LEW)

  7. A comparative assessment of solar thermal electric power plants in the 1-10 MWe range

    NASA Technical Reports Server (NTRS)

    Rosenberg, L. S.; Revere, W. R.

    1981-01-01

    The candidate power system technologies were ranked in terms of the cost of electric energy each system produces. In all cases, it was assumed that development programs would result in mature power plant systems that could be commercially manufactured. The results of the study, a brief description of the systems examined, and the methodologies used are presented.

  8. Environmental effects of solar thermal power systems: ecological observations during construction of the Barstow 10 MWe pilot STPS

    SciTech Connect

    Turner, F.B.

    1981-10-01

    The environmental monitoring plan used consists of comparisons of a few meteorological variables and changes in the states of a limited array of indicator species or assemblages of species of plants and animals. Observations inlude aerial photography of the site, saltation meter measurements downwind from the site to measure fluxes of windblown sand, measurements of airborne particulates and atmospheric pollutants, and baseline temperature profiles made at two sites near the heliostat field to measure micro-meteorological patterns. Observations were made of annual plants both in off-field plots and in heliostat field, of shrubs, birds, rodents, reptiles, and sensitive species listed as rare or endangered. (LEW)

  9. Environmental effects of solar-thermal power systems: ecological observations during early testing of the Barstow 10-MWe pilot STPS

    SciTech Connect

    Turner, F.B.

    1982-11-01

    Environmental measurements were continued at Solar One during 1982, while final steps in construction and early testing were carried out. Measurements of sand depths downwind (east) of the heliostat field indicated that some of the sand blown off the field (most of it between September 1979 and March 1980) has been carried farther east, reducing sand depths somewhat in areas just east of the field. Observations of birds between March and June 1982 revealed that (1) the natural avifauna of the field has been altered, although the area is still used for feeding by some icterids (larks, blackbirds) and aerial insectivores (swallows, swifts); (2) of 15 bird casualties ascribable to the presence and/or operation of Solar One, 12 followed collisions with heliostats, three resulted from incineration in heliostat beams; (3) the central receiver tower does not appear to be a source of mortality. Numbers of rodents (particularly kangaroo rats) trapped in areas downwind of the site declined steadily between 1978 and 1982 in areas both clost to the field and as far east as 600 m from the fence. The most likely interpretation of these changes is a reduction in reproductivity and/or early survival caused by four consecutive years (1978, 1979, 1980, 1981) of suboptimal autumn rainfall. Micrometeorological measurements in areas downwind of Solar One showed small effects on air temperatures (<0.5/sup 0/C), wind speeds (<0.4 m/sec), and evaporation rates (<1.5 ml/hr).Effects were detected only in areas 100 to 190 m from the east perimeter fence. Because these differences are so small, relative to natural heterogeneities, the effects of Solar One on rates of evaporation, air temperatures and wind speed will not affect the downwind biological community. The relavance of these findings to construction of a larger solar thermal power plant (e.g., Solar 100) are considered.

  10. Flue gas desulfurization of high sulfur coals retrofit costs, lime consumption and removal efficiencies 10 Mwe DOE demonstrate plant

    SciTech Connect

    Goss, W.L.

    1993-12-31

    AirPol, with the assistance of the Tennessee Valley Authority (TVA), is demonstrating the Gas Suspension Absorption (GSA) technology in the Clean Coal Technology project entitled {open_quote}10 MW Demonstration of Gas Suspension Absorption.{close_quote} AirPol is performing this demonstration under a Cooperative Agreement awarded by the United States Department of Energy (DOE) in October 1990, in Round III of the Clean Coal Technology Program. This project will be the first North American demonstration of the GSA system in its application for flue gas desulfurization. This low-cost retrofit project seeks to demonstrate the GSA system which is expected to remove more than 90% of the sulfur dioxide (SO{sub 2}) from coal-fired flue gas, while achieving a high utilization of reagent lime. TVA has provided its National Center for Emissions Research (NCER) as the host site and will provide operation and testing services during the operations and testing phase. The TVA NCER is located at the TVA Shawnee Fossil Plant in West Paducah, Kentucky. This Clean Coal Technology project is designed to demonstrate the GSA system`s performance in a coal-fired boiler application, and its suitability for retrofit at existing boiler plants. Air foxics testing and operation and testing of a 1 Mwe fabric filter were added to the operation/testing phase of the project. The additional testing work will be conducted for the purpose of determining the GSA`s performance in removal of air toxics and the significance of replacing the electrostatic precipitator with a fabric filter. The experience gained by AirPol in designing, manufacturing, and constructing the GSA equipment through executing this project will be used for future commercialization of the GSA system. Results of the operation and testing phase will be used to further improve the GSA system design and operation.

  11. Thermoeconomic modeling and parametric study of hybrid SOFC-gas turbine-steam turbine power plants ranging from 1.5 to 10 MWe

    NASA Astrophysics Data System (ADS)

    Arsalis, Alexandros

    Detailed thermodynamic, kinetic, geometric, and cost models are developed, implemented, and validated for the synthesis/design and operational analysis of hybrid SOFC-gas turbine-steam turbine systems ranging in size from 1.5 to 10 MWe. The fuel cell model used in this research work is based on a tubular Siemens-Westinghouse-type SOFC, which is integrated with a gas turbine and a heat recovery steam generator (HRSG) integrated in turn with a steam turbine cycle. The current work considers the possible benefits of using the exhaust gases in a HRSG in order to produce steam which drives a steam turbine for additional power output. Four different steam turbine cycles are considered in this research work: a single-pressure, a dual-pressure, a triple pressure, and a triple pressure with reheat. The models have been developed to function both at design (full load) and off-design (partial load) conditions. In addition, different solid oxide fuel cell sizes are examined to assure a proper selection of SOFC size based on efficiency or cost. The thermoeconomic analysis includes cost functions developed specifically for the different system and component sizes (capacities) analyzed. A parametric study is used to determine the most viable system/component syntheses/designs based on maximizing total system efficiency or minimizing total system life cycle cost.

  12. Plant Maintenance/Training Manual, (RADL Item 2-37): Section 1. Rotating apparatus. 10-MWe solar-thermal central-receiver pilot plant. Solar-facilities design integration

    SciTech Connect

    Not Available

    1981-07-01

    The rotating apparatus include the turbine-generator, pumps, fans, air compressor, blowers and centrifuges. This equipment is listed, and in addition, the pumps and the blowers are described, with specifications and performance data given. (LEW)

  13. Pilot Plant Makes Oxygen Difluoride

    NASA Technical Reports Server (NTRS)

    Humphrey, Marshall F.; Lawton, Emil A.

    1989-01-01

    Pilot plant makes oxygen difluoride highly-energetic, space-storable oxidizer not made commercially. Designed to handle reactants, product, and byproduct, most of which highly reactive, corrosive, and toxic. Oxygen difluoride evolves continuously from reactor containing potassium hydroxide in water at 10 degree C. Collection tanks alternated; one filled while other drained to storage cylinder. Excess OF2 and F2 dissipated in combustion of charcoal in burn barrel. Toxic byproduct, potassium fluoride, reacted with calcium hydroxide to form nontoxic calcium fluoride and to regenerate potassium hydroxide. Equipment processes toxic, difficult-to-make substance efficiently and safely.

  14. The Pilot Conditioning Plant Gorleben

    SciTech Connect

    Willax, H.O.; Lahr, H.

    1995-12-31

    In the Federal Republic of Germany, the feasibility of direct disposal of spent fuel elements has been examined and their safety aspects evaluated in the years between 1979 and 1985. In an assessment of the results, the Federal Government concluded that the technology of direct disposal has to be developed. According to this decision in April 1986, there was the application for the erection and operation of the Pilot Conditioning Plant (PKA) for the conditioning of spent fuel elements and other radioactive waste. Since February 1990, the PKA has been under construction and the hot commissioning will be in 1997.

  15. MINI PILOT PLANT FOR DRINKING WATER RESEARCH

    EPA Science Inventory

    The Water Supply & Water Resources Division (WSWRD) has constructed 2 mini-pilot plant systems used to conduct drinking water research. These two systems each have 2 parallel trains for comparative research. The mini-pilot plants are small conventional drinking water treatment ...

  16. BIMOMASS GASIFICATION PILOT PLANT STUDY

    EPA Science Inventory

    The report gives results of a gasification pilot program using two biomass feedstocks: bagasse pellets and wood chips. he object of the program was to determine the properties of biomass product gas and its suitability as a fuel for gas-turbine-based power generation cycles. he f...

  17. Pilot Plants Enhance Brazosport Lab Courses.

    ERIC Educational Resources Information Center

    Krieger, James

    1986-01-01

    Describes an experiential lab program for a two-year college's chemical technology program. Discusses student experiences in six miniature pilot plants that represent the essential instrumentation and chemical processes found in the chemical industry. Recognizes the industries that helped implement the program. (TW)

  18. Intro to NREL's Thermochemical Pilot Plant

    SciTech Connect

    Magrini, Kim

    2013-09-27

    NREL's Thermochemical Pilot Plant converts biomass into higher hydrocarbon fuels and chemicals.NREL is researching biomass pyrolysis. The lab is examining how to upgrade bio-oils via stabilization. Along with this, NREL is developing the engineering system requirements for producing these fuels and chemicals at larger scales.

  19. Thermochemical Conversion Pilot Plant (Fact Sheet)

    SciTech Connect

    Not Available

    2013-06-01

    The state-of-the-art thermochemical conversion pilot plant includes several configurable, complementary unit operations for testing and developing various reactors, filters, catalysts, and other unit operations. NREL engineers and scientists as well as clients can test new processes and feedstocks in a timely, cost-effective, and safe manner to obtain extensive performance data on processes or equipment.

  20. Argonne National Laboratory's Recycling Pilot Plant

    ScienceCinema

    Spangenberger, Jeff; Jody, Sam

    2016-07-12

    Argonne has a Recycling Pilot Plant designed to save the non-metal portions of junked cars. Here, program managers demonstrate how plastic shredder residue can be recycled. (Currently these automotive leftovers are sent to landfills.) For more information, visit Argonne's Transportation Technology R&D Center Web site at http://www.transportation.anl.gov.

  1. Intro to NREL's Thermochemical Pilot Plant

    ScienceCinema

    Magrini, Kim

    2016-07-12

    NREL's Thermochemical Pilot Plant converts biomass into higher hydrocarbon fuels and chemicals.NREL is researching biomass pyrolysis. The lab is examining how to upgrade bio-oils via stabilization. Along with this, NREL is developing the engineering system requirements for producing these fuels and chemicals at larger scales.

  2. Argonne National Laboratory's Recycling Pilot Plant

    SciTech Connect

    Spangenberger, Jeff; Jody, Sam

    2009-01-01

    Argonne has a Recycling Pilot Plant designed to save the non-metal portions of junked cars. Here, program managers demonstrate how plastic shredder residue can be recycled. (Currently these automotive leftovers are sent to landfills.) For more information, visit Argonne's Transportation Technology R&D Center Web site at http://www.transportation.anl.gov.

  3. Environmental assessment of HYGAS Pilot Plant streams

    SciTech Connect

    Anastasia, L. J.; Evans, R. J.; Bossart, S. J.; Karst, R. H.; Biljetina, R.

    1980-01-01

    The US Department of Energy has commissioned an environmental assessment program to obtain experimental data from the HYGAS Pilot Plant. An important objective of this program is the development of predictive methods to extend the environmental data base to larger-scale demonstration and commercial HYGAS coal gasification plants. This report discusses the systems which have been specifically established for sampling, analysis, and data evaluation to define the fate of compounds of environmental interest generated during pilot plant operation. The pilot plant units of interest include the pretreater and gasifier reactors which are considered scalable to larger plants. Sampling methods used in the program include scheduled, routine grab samples, composited grab samples, on-line composited liquids and solid samples, and on-line gas analysis for selected sulfur species. This paper also discusses the development and use of a high-pressure, high-temperature, sampling system to collect organic and inorganic species from the HYGAS gasifier. Even though the reactor sampling system adopted is very man-power intensive, it greatly reduces the number of samples required and results in a higher overall sampling efficiency. In addition, the on-line sampling train provides immediate capture and stabilization of reactive and volatile species, eliminates process unit lag times, avoids quench tower inefficiencies for many species, and allows rapid monitoring of differences in pollutant production with changing process conditions.

  4. ENVIRONMENTAL ASSESSMENT FOR OTEC PILOT PLANTS

    SciTech Connect

    Wilde, P.

    1980-06-01

    Logical and orderly progression of the OTEC program from conceptual designs through component testing to the goal of commercially viable OTEC plants require that the socio-legal requirements be met and the proper operating permits be obtained and maintained. This function is accomplished in a series of activities including: (1) Development and annual revision of a published OTEC Environmental Development Plan (EDP); (2) Compliance with NEPA/EPA and other regulatory requirements; and (3) Studies and research in support of the above. The Environmental Development Plan (EDP) lists the concerns, outlines the program to consider the effects and validity of such concerns on the OTEC program, and gives the time-table to meet the schedule, integrated with that of the engineering and design programs. The schedules of compliance activities and, to a lesser degree, research also are governed by the development progress of the technology. However, because of the lead time necessary to insure proper review the appropriate regulatory agencies, the environmental assessment program for the OTEC pilot plants (initially starting with the 10/40 MWe unit) is founded on the strategy of progressive improvement of previously accepted documentation. Based on experience with OTEC-1, the procedure for pilot plants will be: (1) Produce generic Environmental Assessment (EA) at the appropriate level of technology in advance of hardware contract; (2) Produce generic Environmental Impact Statement (EIS) at approximately the same time as the hardware procurement; (3) Monitor production of site specific supplement to the generic EIS prepared by the hardware contractor; (4) Assist pilot plant operator in applying and obtaining permits by providing current research and modeling data; (5) Monitor environmental program as required by regulatory agency; and (6) Use new site data for refining models for future pilot plant. assessments.

  5. Advanced Gasifier Pilot Plant Concept Definition

    SciTech Connect

    Steve Fusselman; Alan Darby; Fred Widman

    2005-08-31

    This report presents results from definition of a preferred commercial-scale advanced gasifier configuration and concept definition for a gasification pilot plant incorporating those preferred technologies. The preferred commercial gasifier configuration was established based on Cost Of Electricity estimates for an IGCC. Based on the gasifier configuration trade study results, a compact plug flow gasifier, with a dry solids pump, rapid-mix injector, CMC liner insert and partial quench system was selected as the preferred configuration. Preliminary systems analysis results indicate that this configuration could provide cost of product savings for electricity and hydrogen ranging from 15%-20% relative to existing gasifier technologies. This cost of product improvement draws upon the efficiency of the dry feed, rapid mix injector technology, low capital cost compact gasifier, and >99% gasifier availability due to long life injector and gasifier liner, with short replacement time. A pilot plant concept incorporating the technologies associated with the preferred configuration was defined, along with cost and schedule estimates for design, installation, and test operations. It was estimated that a 16,300 kg/day (18 TPD) pilot plant gasifier incorporating the advanced gasification technology and demonstrating 1,000 hours of hot-fire operation could be accomplished over a period of 33 months with a budget of $25.6 M.

  6. Nuclear electric propulsion options for piloted Mars missions

    NASA Technical Reports Server (NTRS)

    George, Jeffrey A.

    1993-01-01

    Three nuclear electric propulsion (NEP) systems are discussed. The three systems are as follows: a system based on current SP-100 technology; a potassium Rankine-cycle based power conversion system, and an argon ion thruster system. The system will be researched for implementation in several possible vehicle configurations. The following are among the possible Mars vehicle configurations: a piloted 15 MWe multi-reactor vehicle; a piloted 10 MWe vehicle with ECCV; a piloted 10 MWe modular vehicle; piloted 10 and 15 MWe vehicles with ECCV and MEV; a piloted 5 MWe vehicle with ECCV; a 5 MWe cargo vehicle with 2 MEV's; and a 2.5 MWe vehicle with MEV.

  7. Nuclear electric propulsion options for piloted Mars missions

    NASA Astrophysics Data System (ADS)

    George, Jeffrey A.

    Three nuclear electric propulsion (NEP) systems are discussed. The three systems are as follows: a system based on current SP-100 technology; a potassium Rankine-cycle based power conversion system, and an argon ion thruster system. The system will be researched for implementation in several possible vehicle configurations. The following are among the possible Mars vehicle configurations: a piloted 15 MWe multi-reactor vehicle; a piloted 10 MWe vehicle with ECCV; a piloted 10 MWe modular vehicle; piloted 10 and 15 MWe vehicles with ECCV and MEV; a piloted 5 MWe vehicle with ECCV; a 5 MWe cargo vehicle with 2 MEV's; and a 2.5 MWe vehicle with MEV.

  8. DU-AGG pilot plant design study

    SciTech Connect

    Lessing, P.A.; Gillman, H.

    1996-07-01

    The Idaho National Engineering Laboratory (INEL) is developing new methods to produce high-density aggregate (artificial rock) primarily consisting of depleted uranium oxide. The objective is to develop a low-cost method whereby uranium oxide powder (UO[sub 2], U[sub 3]O[sub ]8, or UO[sub 3]) can be processed to produce high-density aggregate pieces (DU-AGG) having physical properties suitable for disposal in low-level radioactive disposal facilities or for use as a component of high-density concrete used as shielding for radioactive materials. A commercial company, G-M Systems, conducted a design study for a manufacturing pilot plant to process DU-AGG. The results of that study are included and summarized in this report. Also explained are design considerations, equipment capacities, the equipment list, system operation, layout of equipment in the plant, cost estimates, and the proposed plan and schedule.

  9. Waste Isolation Pilot Plant, Land Management Plan

    SciTech Connect

    Not Available

    1993-12-01

    To reflect the requirement of section 4 of the Wastes Isolation Pilot Plant Land Withdrawal Act (the Act) (Public Law 102-579), this land management plan has been written for the withdrawal area consistent with the Federal Land Policy and Management Act of 1976. The objective of this document, per the Act, is to describe the plan for the use of the withdrawn land until the end of the decommissioning phase. The plan identifies resource values within the withdrawal area and promotes the concept of multiple-use management. The plan also provides opportunity for participation in the land use planning process by the public and local, State, and Federal agencies. Chapter 1, Introduction, provides the reader with the purpose of this land management plan as well as an overview of the Waste Isolation Pilot Plant. Chapter 2, Affected Environment, is a brief description of the existing resources within the withdrawal area. Chapter 3, Management Objectives and Planned Actions, describes the land management objectives and actions taken to accomplish these objectives.

  10. TASK 3: PILOT PLANT GASIFIER TESTING

    SciTech Connect

    Fusselman, Steve

    2015-11-01

    Aerojet Rocketdyne (AR) has developed an innovative gasifier concept incorporating advanced technologies in ultra-dense phase dry feed system, rapid mix injector, and advanced component cooling to significantly improve gasifier performance, life, and cost compared to commercially available state-of-the-art systems. Design, fabrication and initial testing of the pilot plant compact gasifier was completed in 2011 by a development team led by AR. Findings from this initial test program, as well as subsequent gasifier design and pilot plant testing by AR, identified a number of technical aspects to address prior to advancing into a demonstration-scale gasifier design. Key among these were an evaluation of gasifier ability to handle thermal environments with highly reactive coals; ability to handle high ash content, high ash fusion temperature coals with reliable slag discharge; and to develop an understanding of residual properties pertaining to gasification kinetics as carbon conversion approaches 99%. The gasifier did demonstrate the ability to withstand the thermal environments of highly reactive Powder River Basin coal, while achieving high carbon conversion in < 0.15 seconds residence time. Continuous operation with the high ash fusion temperature Xinyuan coal was demonstrated in long duration testing, validating suitability of outlet design as well as downstream slag discharge systems. Surface area and porosity data were obtained for the Xinyuan and Xinjing coals for carbon conversion ranging from 85% to 97%, and showed a pronounced downward trend in surface area per unit mass carbon as conversion increased. Injector faceplate measurements showed no incremental loss of material over the course of these experiments, validating the commercially traceable design approach and supportive of long injector life goals. Hybrid testing of PRB and natural gas was successfully completed over a wide range of natural gas feed content, providing test data to anchor predictions

  11. Development of 1000kW-class MCFC pilot plant

    SciTech Connect

    Ooue, M.; Yasue, H.; Takasu, K.; Tsuchitori, T.

    1996-12-31

    This pilot plant is a part of the New Sunshine Program which has proceeded by the Agency of Industrial Science and Technology of the Ministry of International Trade and Industry. MCFC Research Association is entrusted with the development of the pilot plant, and constructing it at Kawagoe site. Following items will be verified by this pilot plant operation. (a) Development of 250kW class stack and confirmation of stack performance and decay rate. (b) System verification such as basic process, control system and operation characteristics, toward commercialization. (c) To get design data for demonstration plant.

  12. Waste Isolation Pilot Plant Safety Analysis Report

    SciTech Connect

    1995-11-01

    The following provides a summary of the specific issues addressed in this FY-95 Annual Update as they relate to the CH TRU safety bases: Executive Summary; Site Characteristics; Principal Design and Safety Criteria; Facility Design and Operation; Hazards and Accident Analysis; Derivation of Technical Safety Requirements; Radiological and Hazardous Material Protection; Institutional Programs; Quality Assurance; and Decontamination and Decommissioning. The System Design Descriptions`` (SDDS) for the WIPP were reviewed and incorporated into Chapter 3, Principal Design and Safety Criteria and Chapter 4, Facility Design and Operation. This provides the most currently available final engineering design information on waste emplacement operations throughout the disposal phase up to the point of permanent closure. Also, the criteria which define the TRU waste to be accepted for disposal at the WIPP facility were summarized in Chapter 3 based on the WAC for the Waste Isolation Pilot Plant.`` This Safety Analysis Report (SAR) documents the safety analyses that develop and evaluate the adequacy of the Waste Isolation Pilot Plant Contact-Handled Transuranic Wastes (WIPP CH TRU) safety bases necessary to ensure the safety of workers, the public and the environment from the hazards posed by WIPP waste handling and emplacement operations during the disposal phase and hazards associated with the decommissioning and decontamination phase. The analyses of the hazards associated with the long-term (10,000 year) disposal of TRU and TRU mixed waste, and demonstration of compliance with the requirements of 40 CFR 191, Subpart B and 40 CFR 268.6 will be addressed in detail in the WIPP Final Certification Application scheduled for submittal in October 1996 (40 CFR 191) and the No-Migration Variance Petition (40 CFR 268.6) scheduled for submittal in June 1996. Section 5.4, Long-Term Waste Isolation Assessment summarizes the current status of the assessment.

  13. Draft environmental assessment: Ocean Thermal Energy Conversion (OTEC) Pilot Plants

    SciTech Connect

    Sullivan, S.M.; Sands, M.D.; Donat, J.R.; Jepsen, P.; Smookler, M.; Villa, J.F.

    1981-02-01

    This Environmental Assessment (EA) has been prepared, in accordance with the National Environmental Policy Act of 1969, for the deployment and operation of a commercial 40-Megawatt (MW) Ocean Thermal Energy Conversion (OTEC) Pilot Plant (hereafter called the Pilot Plant). A description of the proposed action is presented, and a generic environment typical of the candidate Pilot Plant siting regions is described. An assessment of the potential environmental impacts associated with the proposed action is given, and the risk of credible accidents and mitigating measures to reduce these risks are considered. The Federal and State plans and policies the proposed action will encompass are described. Alternatives to the proposed action are presented. Appendix A presents the navigation and environmental information contained in the US Coast Pilot for each of the candidate sites; Appendix B provides a brief description of the methods and calculations used in the EA. It is concluded that environmental disturbances associated with Pilot Plant activities could potentially cause significant environmental impacts; however, the magnitude of these potential impacts cannot presently be assessed, due to insufficient engineering and environmental information. A site- and design-specific OTEC Pilot Plant Environmental Impact Statement (EIS) is required to resolve the potentially significant environmental effects associated with Pilot Plant deployment and operation. (WHK)

  14. Crow Municipal Rural & Industrial Pilot Water Treatment Plant NPDES Permit

    EPA Pesticide Factsheets

    Under NPDES permit MT-0031827, the Crow Indian Tribe is authorized to discharge from the Crow Municipal Rural & Industrial (MR&I) Pilot Water Treatment Plant in Bighorn County, Montana to the Bighorn River.

  15. Waste Isolation Pilot Plant Environmental Monitoring Plan

    SciTech Connect

    None, None

    2008-03-12

    U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, requires each DOE site to conduct environmental monitoring. Environmental monitoring at the Waste Isolation Pilot Plant (WIPP) is conducted in order to: (a) Verify and support compliance with applicable federal, state, and local environmental laws, regulations, permits, and orders; (b) Establish baselines and characterize trends in the physical, chemical, and biological condition of effluent and environmental media; (c) Identify potential environmental problems and evaluate the need for remedial actions or measures to mitigate the problems; (d) Detect, characterize, and report unplanned releases; (e) Evaluate the effectiveness of effluent treatment and control, and pollution abatement programs; and (f) Determine compliance with commitments made in environmental impact statements, environmental assessments, safety analysis reports, or other official DOE documents. This Environmental Monitoring Plan (EMP) explains the rationale and design criteria for the environmental monitoring program, extent and frequency of monitoring and measurements, procedures for laboratory analyses, quality assurance (QA) requirements, program implementation procedures, and direction for the preparation and disposition of reports. Changes to the environmental monitoring program may be necessary to allow the use of advanced technology and new data collection techniques. This EMP will document changes in the environmental monitoring program. Guidance for preparation of EMPs is contained in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance.

  16. Waste isolation pilot plant disposal room model

    SciTech Connect

    Butcher, B.M.

    1997-08-01

    This paper describes development of the conceptual and mathematical models for the part of the Waste Isolation Pilot Plant (WIPP) repository performance assessment that is concerned with what happens to the waste over long times after the repository is decommissioned. These models, collectively referred to as the {open_quotes}Disposal Room Model,{close_quotes} describe the repository closure process during which deformation of the surrounding salt consolidates the waste. First, the relationship of repository closure to demonstration of compliance with the Environmental Protection Agency (EPA) standard (40 CFR 191 Appendix C) and how sensitive performance results are to it are examined. Next, a detailed description is provided of the elements of the disposal region, and properties selected for the salt, waste, and other potential disposal features such as backfill. Included in the discussion is an explanation of how the various models were developed over time. Other aspects of closure analysis, such as the waste flow model and method of analysis, are also described. Finally, the closure predictions used in the final performance assessment analysis for the WIPP Compliance Certification Application are summarized.

  17. Waste Isolation Pilot Plant Salt Decontamination Testing

    SciTech Connect

    Demmer, Ricky Lynn; Reese, Stephen Joseph

    2015-03-01

    On February 14, 2014, americium and plutonium contamination was released in the Waste Isolation Pilot Plant (WIPP) salt caverns. Several practical, easily deployable methods of decontaminating WIPP salt, using a surrogate contaminant and americium (241Am), were developed and tested. The effectiveness of the methods is evaluated qualitatively, and to the extent practical, quantitatively. Of the methods tested (dry brushing, vacuum cleaning, water washing, mechanical grinding, strippable coatings, and fixative barriers), the most practical seems to be water washing. Effectiveness is very high, and water washing is easy and rapid to deploy. The amount of wastewater produced (~2 L/m2) would be substantial and may not be easy to manage, but the method is the clear winner from a usability perspective. Removable surface contamination levels (smear results) from water washed coupons found no residual removable contamination. Thus, whatever contamination is left is likely adhered to (or trapped within) the salt. The other option that shows promise is the use of a fixative barrier. Bartlett Nuclear, Inc.’s Polymeric Barrier System proved the most durable of the coatings tested. The coatings were not tested for contaminant entrapment, only for coating integrity and durability.

  18. Waste Isolation Pilot Plant Salt Decontamination Testing

    SciTech Connect

    Rick Demmer; Stephen Reese

    2014-09-01

    On February 14, 2014, americium and plutonium contamination was released in the Waste Isolation Pilot Plant (WIPP) salt caverns. At the request of WIPP’s operations contractor, Idaho National Laboratory (INL) personnel developed several methods of decontaminating WIPP salt, using surrogate contaminants and also americium (241Am). The effectiveness of the methods is evaluated qualitatively, and to the extent possible, quantitatively. One of the requirements of this effort was delivering initial results and recommendations within a few weeks. That requirement, in combination with the limited scope of the project, made in-depth analysis impractical in some instances. Of the methods tested (dry brushing, vacuum cleaning, water washing, strippable coatings, and mechanical grinding), the most practical seems to be water washing. Effectiveness is very high, and it is very easy and rapid to deploy. The amount of wastewater produced (2 L/m2) would be substantial and may not be easy to manage, but the method is the clear winner from a usability perspective. Removable surface contamination levels (smear results) from the strippable coating and water washing coupons found no residual removable contamination. Thus, whatever is left is likely adhered to (or trapped within) the salt. The other option that shows promise is the use of a fixative barrier. Bartlett Nuclear, Inc.’s Polymeric Barrier System (PBS) proved the most durable of the coatings tested. The coatings were not tested for contaminant entrapment, only for coating integrity and durability.

  19. Safeguards techniques in a pilot conditioning plant for spent fuel

    SciTech Connect

    Leitner, E.; Rudolf, K.; Weh, R. )

    1991-01-01

    The pilot conditioning plant at Gorleben, Germany, is designed as a multi-purpose plant. Its primary task is the conditioning of spent fuel assemblies into a form suitable for final disposal. As a pilot plant, it allows furthermore for the development and testing of various conditioning techniques. In terms of international safeguards, the pilot conditioning plant is basically considered an item facility. Entire fuel assemblies enter the plant in transport casks, whereas bins filled with fuel rods or canisters containing cut fuel rods leave the facility in final disposal packages (e.g. POLLUX). Each POLLUX final disposal package content is uniquely correlated to a definite number of fuel assemblies which have entered the conditioning process. For this type of facility, containment/surveillance (C/S) should take over the major role in nuclear material safeguards. This paper discusses the safeguards at the Gorleben plant.

  20. UV disinfection pilot plant study at the Savannah River Site

    SciTech Connect

    Huffines, R.L.; Beavers, B.A.

    1993-05-01

    An ultraviolet light disinfection system pilot plant was operated at the Savannah River Site Central Shops sanitary wastewater treatment package plant July 14, 1992 through August 13, 1992. The purpose was to determine the effectiveness of ultraviolet light disinfection on the effluent from the small package-type wastewater treatment plants currently used on-site. This pilot plant consisted of a rack of UV lights suspended in a stainless steel channel through which a sidestream of effluent from the treatment plant clarifier was pumped. Fecal coliform analyses were performed on the influent to and effluent from the pilot unit to verify the disinfection process. UV disinfection was highly effective in reducing fecal coliform colonies within NPDES permit limitations even under process upset conditions. The average fecal coliform reduction exceeded 99.7% using ultraviolet light disinfection under normal operating conditions at the package treatment plants.

  1. UV disinfection pilot plant study at the Savannah River Site

    SciTech Connect

    Huffines, R.L.; Beavers, B.A.

    1993-01-01

    An ultraviolet light disinfection system pilot plant was operated at the Savannah River Site Central Shops sanitary wastewater treatment package plant July 14, 1992 through August 13, 1992. The purpose was to determine the effectiveness of ultraviolet light disinfection on the effluent from the small package-type wastewater treatment plants currently used on-site. This pilot plant consisted of a rack of UV lights suspended in a stainless steel channel through which a sidestream of effluent from the treatment plant clarifier was pumped. Fecal coliform analyses were performed on the influent to and effluent from the pilot unit to verify the disinfection process. UV disinfection was highly effective in reducing fecal coliform colonies within NPDES permit limitations even under process upset conditions. The average fecal coliform reduction exceeded 99.7% using ultraviolet light disinfection under normal operating conditions at the package treatment plants.

  2. Waste Isolation Pilot Plant Environmental Monitoring Plan

    SciTech Connect

    Washington Regulatory and Environmental Services; Washington TRU Solutions LLC

    2004-02-19

    U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, requires each DOE site to conduct environmental monitoring. Environmental monitoring at the Waste Isolation Pilot Plant (WIPP) is conducted in order to: (a) Verify and support compliance with applicable federal, state, and local environmental laws, regulations, permits, and orders; (b) Establish baselines and characterize trends in the physical, chemical, and biological condition of effluent and environmental media; (c) Identify potential environmental problems and evaluate the need for remedial actions or measures to mitigate the problem; (d) Detect, characterize, and report unplanned releases; (e) Evaluate the effectiveness of effluent treatment and control, and pollution abatement programs; and (f) Determine compliance with commitments made in environmental impact statements, environmental assessments, safety analysis reports, or other official DOE documents. This Environmental Monitoring Plan (EMP) has been written to contain the rationale and design criteria for the monitoring program, extent and frequency of monitoring and measurements, procedures for laboratory analyses, quality assurance (QA) requirements, program implementation procedures, and direction for the preparation and disposition of reports. Changes to the environmental monitoring program may be necessary to allow the use of advanced technology and new data collection techniques. This EMP will document any proposed changes in the environmental monitoring program. Guidance for preparation of Environmental Monitoring Plans is contained in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance. The plan will be effective when it is approved by the appropriate Head of Field Organization or their designee. The plan discusses major environmental monitoring and hydrology activities at the WIPP and describes the programs established to ensure that WIPP operations do not

  3. INTERIOR PHOTO OF HOT PILOT PLANT SECOND FLOOR DEPICTING DETAIL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    INTERIOR PHOTO OF HOT PILOT PLANT SECOND FLOOR DEPICTING DETAIL OF SHIELDED CAVE (CPP-640) LOOKING SOUTHWEST. PHOTO TAKEN FROM NORTH. INL PHOTO NUMBER HD-54-40-2. Mike Crane, Photographer, 7/2006 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  4. ARCHITECTURAL ROOF PLAN AND WESTSOUTHEAST ELEVATIONS OF HOT PILOT PLANT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ARCHITECTURAL ROOF PLAN AND WEST-SOUTHEAST ELEVATIONS OF HOT PILOT PLANT (CPP-640). INL DRAWING NUMBER 200-0640-00-279-111680. ALTERNATE ID NUMBER 8952-CPP-640-A-3. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  5. ARCHITECTURAL SECTIONS A, B, C, D, OF HOT PILOT PLANT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ARCHITECTURAL SECTIONS A, B, C, D, OF HOT PILOT PLANT (CPP-640). INL DRAWING NUMBER 200-0640-00-279-111681. ALTERNATE ID NUMBER 8952-CPP-640-A-5. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  6. INTERIOR PHOTO OF HOT PILOT PLANT SECOND FLOOR WITH SOUTH ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    INTERIOR PHOTO OF HOT PILOT PLANT SECOND FLOOR WITH SOUTH SECTION OF SHIELDED CAVE IN FOREGROUND (CPP-640) LOOKING NORTHWEST. INL PHOTO NUMBER HD-54-40-1. Mike Crane, Photographer, 7/2006 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  7. Initial second-generation PFB carbonizer pilot plant test results

    SciTech Connect

    Robertson, A.; Van Hook, J. ); Froehlich, R. ); Bonk, D.L. )

    1992-01-01

    Second-generation pressurized fluidized bed combustion (PFBC) plants promise higher efficiency with lower costs of electricity and lower stack emissions. With a l6.55 MPa/538{degree}C/538{degree}C/63.5-mm Hg(2400-psig/1000{degree} F/1000{degree}F/2.5-in.Hg) conventional steam cycle and a 3-percent sulfur Pittsburgh No. 8 coal, a 45-percent efficiency and a cost of electricity {approximately} 20 percent lower than that of a pulverized-coal-fired plant with stack gas scrubbing are being projected. Foster Wheeler Development Corporation has constructed and is operating a second-generation PFB pilot plant at the Foster Wheeler research facility (the John Blizard Research Center) in Livingston, New Jersey. Initial results of the pilot plant carbonizer test program supporting the development of this new type of plant are presented.

  8. Performance of a second-generation PFB pilot plant combustor

    SciTech Connect

    Bonk, D.L.; Conn, R.; Van Hook, J.; Robertson, A.

    1995-04-01

    Second-generation on pressurized fluidized bed combustion (PFBC) plants promise higher efficiency with lower costs of electricity and lower stack emissions. With a conventional reheat cycle and a 3-percent sulfur Pittsburgh No. 8 coal, a 45-percent efficiency (HHV of coal basis) and a cost of electricity {approximately}20 percent lower than that of a pulverized-coal-fired plant with stack gas scrubbing are being projected. This advanced plant concept incorporates three major steps: carbonization, circulating fluidized bed combustion and topping combustion. Foster Wheeler Development Corporation has constructed and operated a second-generation PFB pilot plant at the Foster Wheeler research facility (the John Blizard Research Center) in Livingston, New Jersey. Results of the pilot plant combustor portion of the test program supporting the development of this new type of plant are presented. The fuels evaluated in this test program included several char-sorbent residues produced in a pressurized carbonizer pilot plant and their parent coals. The data confirmed the viability of the PFB combustor concept in terms of both combustion and emissions performance.

  9. 500-kW DCHX pilot-plant evaluation testing

    SciTech Connect

    Hlinak, A.; Lee, T.; Loback, J.; Nichols, K.; Olander, R.; Oshmyansky, S.; Roberts, G.; Werner, D.

    1981-10-01

    Field tests with the 500 kW Direct Contact Pilot Plant were conducted utilizing brine from well Mesa 6-2. The tests were intended to develop comprehensive performance data, design criteria, and economic factors for the direct contact power plant. The tests were conducted in two phases. The first test phase was to determine specific component performance of the DCHX, turbine, condensers and pumps, and to evaluate chemical mass balances of non-condensible gases in the IC/sub 4/ loop and IC/sub 4/ in the brine stream. The second test phase was to provide a longer term run at nearly fixed operating conditions in order to evaluate plant performance and identify operating cost data for the pilot plant. During these tests the total accumulated run time on major system components exceeded 1180 hours with 777 hours on the turbine prime mover. Direct contact heat exchanger performance exceeded the design prediction.

  10. Dissolution studies with pilot plant and actual INTEC calcines

    SciTech Connect

    Herbst, R.S.; Garn, T.G.

    1999-04-01

    The dissolution of Idaho Nuclear Technology and Engineering Center (INTEC) pilot plant calcines was examined to determine solubility of calcine matrix components in acidic media. Two representatives pilot plant calcine types were studied: Zirconia calcine and Zirconia/Sodium calcine. Dissolution of these calcines was evaluated using lower initial concentrations of nitric acid than used in previous tests to decrease the [H+] concentration in the final solutions. Lower [H+] concentrations contribute to more favorable TRUEX/SREX solvent extraction flowsheet performance. Dissolution and analytical results were also obtained for radioactive calcines produced using high sodium feeds blended with non-radioactive Al(NO{sub 3}){sub 3} solutions to dilute the sodium concentration and prevent bed agglomeration during the calcination process. Dissolution tests indicated {gt}95 wt.% of the initial calcine mass can be dissolved using the baseline dissolution procedure, with the exception that higher initial nitric acid concentrations are required. The higher initial acid concentration is required for stoichiometric dissolution of the oxides, primarily aluminum oxide. Statistically designed experiments using pilot plant calcine were performed to determine the effect of mixing rate on dissolution efficiency. Mixing rate was determined to provide minimal effects on wt.% dissolution. The acid/calcine ratio and temperature were the predominate variables affecting the wt.% dissolution, a result consistent with previous studies using other similar types of pilot plant calcines.

  11. Dissolution Studies With Pilot Plant and Actual INTEC Calcines

    SciTech Connect

    Herbst, Ronald Scott; Garn, Troy Gerry

    1999-04-01

    The dissolution of Idaho Nuclear Technology and Engineering Center (INTEC) pilot plant calcines was examined to determine solubility of calcine matrix components in acidic media. Two representatives pilot plant calcine types were studied: Zirconia calcine and Zirconia/ Sodium calcine. Dissolution of these calcines was evaluated using lower initial concentrations of nitric acid than used in previous tests to decrease the [H+] concentration in the final solutions. Lower [H+] concentrations contribute to more favorable TRUEX/SREX solvent extraction flowsheet performance. Dissolution and analytical results were also obtained for radioactive calcines produced using high sodium feeds blended with non-radioactive A1(NO3)3 solutions to dilute the sodium concentration and prevent bed agglomeration during the calcination process. Dissolution tests indicated >95 wt. % of the initial calcine mass can be dissolved using the baseline dissolution procedure, with the exception that higher initial nitric acid concentrations are required. The higher initial acid concentration is required for stoichiometric dissolution of the oxides, primarily aluminum oxide. Statistically designed experiments using pilot plant calcine were performed to determine the effect of mixing rate on dissolution efficiency. Mixing rate was determined to provide minimal effects on wt. % dissolution. The acid/calcine ratio and temperature were the predominate variables affecting the wt. % dissolution, a result consistent with previous studies using other similar types of pilot plant calcines.

  12. Hydrothermal Oxidation Hazardous Waste Pilot Plant Test Bed

    SciTech Connect

    Welland, H.; Reed, W.; Valentich, D.; Charlton, T.

    1995-03-01

    The Idaho National Engineering Laboratory (INEL) is fabricating a Hydrothermal Oxidation (HTO) Hazardous Waste Pilot Plant Test Bed to evaluate and test various HTO reactor concepts for initial processing of the U.S. Department of Energy (DOE) mixed wastes. If the HTO process is successful it will significantly reduce the volume of DOE mixed wastes by destroying the organic constituents.

  13. Analysis of Waste Isolation Pilot Plant Samples: Integrated Summary Report

    SciTech Connect

    Britt, Phillip F

    2015-03-01

    Analysis of Waste Isolation Pilot Plant Samples: Integrated Summary Report. Summaries of conclusions, analytical processes, and analytical results. Analysis of samples taken from the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico in support of the WIPP Technical Assessment Team (TAT) activities to determine to the extent feasible the mechanisms and chemical reactions that may have resulted in the breach of at least one waste drum and release of waste material in WIPP Panel 7 Room 7 on February 14, 2014. This report integrates and summarizes the results contained in three separate reports, described below, and draws conclusions based on those results. Chemical and Radiochemical Analyses of WIPP Samples R-15 C5 SWB and R16 C-4 Lip; PNNL-24003, Pacific Northwest National Laboratory, December 2014 Analysis of Waste Isolation Pilot Plant (WIPP) Underground and MgO Samples by the Savannah River National Laboratory (SRNL); SRNL-STI-2014-00617; Savannah River National Laboratory, December 2014 Report for WIPP UG Sample #3, R15C5 (9/3/14); LLNL-TR-667015; Lawrence Livermore National Laboratory, January 2015 This report is also contained in the Waste Isolation Pilot Plant Technical Assessment Team Report; SRNL-RP-2015-01198; Savannah River National Laboratory, March 17, 2015, as Appendix C: Analysis Integrated Summary Report.

  14. 7 CFR 1412.48 - Planting Transferability Pilot Project.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... a program of crop rotation on the farm to achieve agronomic and pest and disease management benefits... PROGRAM AND AVERAGE CROP REVENUE ELECTION PROGRAM FOR THE 2008 AND SUBSEQUENT CROP YEARS Direct and... § 1412.47, for each of the 2009 and subsequent crop years, the Planting Transferability Pilot...

  15. 7 CFR 1412.48 - Planting Transferability Pilot Project.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... a program of crop rotation on the farm to achieve agronomic and pest and disease management benefits... PROGRAM AND AVERAGE CROP REVENUE ELECTION PROGRAM FOR THE 2008 AND SUBSEQUENT CROP YEARS Direct and... § 1412.47, for each of the 2009 and subsequent crop years, the Planting Transferability Pilot...

  16. 7 CFR 1412.48 - Planting Transferability Pilot Project.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... a program of crop rotation on the farm to achieve agronomic and pest and disease management benefits... PROGRAM AND AVERAGE CROP REVENUE ELECTION PROGRAM FOR THE 2008 AND SUBSEQUENT CROP YEARS Direct and... § 1412.47, for each of the 2009 and subsequent crop years, the Planting Transferability Pilot...

  17. 7 CFR 1412.48 - Planting Transferability Pilot Project.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... a program of crop rotation on the farm to achieve agronomic and pest and disease management benefits... PROGRAM AND AVERAGE CROP REVENUE ELECTION PROGRAM FOR THE 2008 AND SUBSEQUENT CROP YEARS Direct and... § 1412.47, for each of the 2009 and subsequent crop years, the Planting Transferability Pilot...

  18. 7 CFR 1412.48 - Planting Transferability Pilot Project.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... a program of crop rotation on the farm to achieve agronomic and pest and disease management benefits... PROGRAM AND AVERAGE CROP REVENUE ELECTION PROGRAM FOR THE 2008 AND SUBSEQUENT CROP YEARS Direct and... § 1412.47, for each of the 2009 and subsequent crop years, the Planting Transferability Pilot...

  19. Calciner Pilot Plant waste minimization practices at the ICPP

    SciTech Connect

    Brewer, K.N.

    1991-07-30

    Westinghouse Idaho Nuclear operates the DOE`s Idaho Chemical Processing Plant to recover uranium from spent Navy fuel. The high level radioactive liquid waste generated recovery operations is solidified in a fluidized bed calciner. Two calciner pilot plants at the Idaho Chemicaling plant are used to: (1) produce calcine, (2) develop new chemical flowsheets, and (3) optimize full-scale operations for the calcination of highly radioactive liquid waste at the ICPP`s New Waste Calcining Facility (NWCF). As a consequence of the pilot plants operations, non-radioactive solid and liquid waste is ted by the calciner Pilot Plants during their operation. Solid and liquid waste volume data between 1980--1990 have been gathered and evaluated. This data shows that solid hazardous generation volumes have been reduced by 59% and liquid waste (hazardous and non-hazardous) generation volumes have been reduced by an average of 58% over this time period. The improvements are a results of: (1) segregating potentially hazardous contaminated waste as non-hazardous after verification by random sampling (59% reduction), (2) reducing liquid waste at the source and (3) recycling the liquid waste (58% reduction).

  20. High efficiency waste to energy facility -- Pilot plant design

    SciTech Connect

    Orita, Norihiko; Kawahara, Yuuzou; Takahashi, Kazuyoshi; Yamauchi, Toru; Hosoda, Takuo

    1998-07-01

    Waste To Energy facilities are commonly acceptable to the environment and give benefits in two main areas: one is a hygienic waste disposal and another is waste heat energy recovery to save fossil fuel consumption. Recovered energy is used for electricity supply, and it is required to increase the efficiency of refuse to electric energy conversion, and to spread the plant construction throughout the country of Japan, by the government. The national project started in 1992, and pilot plant design details were established in 1995. The objective of the project is to get 30% of energy conversion efficiency through the measure by raising the steam temperature and pressure to 500 C and 9.8 MPa respectively. The pilot plant is operating under the design conditions, which verify the success of applied technologies. This paper describes key technologies which were used to design the refuse burning boiler, which generates the highest steam temperature and pressure steam.

  1. The pilot plant for electron beam food processing

    NASA Astrophysics Data System (ADS)

    Migdal, W.; Walis, L.; Chmielewski, A. G.

    1993-07-01

    In the frames of the national programme on the application of irradiation for food preservation and hygienization an experimental plant for electron beam processing has been established in INCT. The pilot plant has been constructed inside an old fort what decreases significantly the cost of the investment. The pilot plant is equipped with a small research accelerator Pilot (10 MeV, 1 kW) and an industrial unit Elektronika (10 MeV, 10 kW). This allows both laboratory and full technological scale testing of the elaborated process to be conducted. The industrial unit is being equipped with e-/X conversion target, for high density products irradiation. On the basis of the research there were performed at different scientific institutions in Poland, health authorities have issued permissions for permanent treatment of spices, garlic, onions and temporary permissions for mushrooms, and potatoes. Dosimetric methods have been elaborated for the routine use at the plant. In the INCT laboratory methods for the control of e-/X treated food have been established.

  2. Optimal design of a pilot OTEC power plant in Taiwan

    SciTech Connect

    Tseng, C.H.; Kao, K.Y. ); Yang, J.C. )

    1991-12-01

    In this paper, an optimal design concept has been utilized to find the best designs for a complex and large-scale ocean thermal energy conversion (OTEC) plant. THe OTEC power plant under this study is divided into three major subsystems consisting of power subsystem, seawater pipe subsystem, and containment subsystem. The design optimization model for the entire OTEC plant is integrated from these sub-systems under the considerations of their own various design criteria and constraints. The mathematical formulations of this optimization model for the entire OTEC plant are described. The design variables, objective function, and constraints for a pilot plant under the constraints of the feasible technologies at this stage in Taiwan have been carefully examined and selected.

  3. New "wet type" electron beam flue gas treatment pilot plant

    NASA Astrophysics Data System (ADS)

    Tan, Erdal; Ünal, Suat; Doğan, Alişan; Letournel, Eric; Pellizzari, Fabien

    2016-02-01

    We describe a new pilot plant for flue gas cleaning by a high energy electron beam. The special feature of this pilot plant is a uniquely designed reactor called VGS® (VIVIRAD Gas Scrubber, patent pending), that allows oxidation/reduction treating flue gas in a single step. The VGS® process combines a scrubber and an advanced oxidation/reduction process with the objective of optimizing efficiency and treatment costs of flue gas purification by electron accelerators. Promising treatment efficiency was achieved for SOx and NOx removal in early tests (99.2% and 80.9% respectively). The effects of various operational parameters on treatment performance and by-product content were investigated during this study.

  4. MBR pilot plant for textile wastewater treatment and reuse.

    PubMed

    Lubello, C; Caffaz, S; Mangini, L; Santianni, D; Caretti, C

    2007-01-01

    An experimental study was carried out in order to evaluate the possibility of upgrading the conventional activated sludge WWTP of Seano (Prato, Italy) which treats municipal and textile wastewaters, by using membrane bioreactor (MBR) technology. The MBR pilot plant, set up within Seano WWTP, was fed with mixed municipal-industrial wastewaters during the first experimental period and with pure industrial wastewaters during the second. Performances and operation of the MBR were evaluated in terms of permeate characteristics and variability (COD, colour, surfactants, total N and P) and other operational parameters (sludge growth and observed yield). According to the experimental results the MBR permeate quality was always superior to the Seano WWTP one and it was suitable for industrial reuse in the textile district of the Prato area. Respirometric tests provided a modified IWA ASM1 model which fits very well the experimental data and can be used for the design and the monitoring of a full-scale MBR pilot plant.

  5. The development of the MELiSSA Pilot Plant Facility

    NASA Astrophysics Data System (ADS)

    Godia, Francesc; Dussap, Claude-Gilles; Dixon, Mike; Peiro, Enrique; Fossen, Arnaud; Lamaze, Brigitte; Brunet, Jean; Demey, Dries; Mas-Albaigès, Joan L.

    MELiSSA (Micro-Ecological Life Support System Alternative) is a closed artificial ecosystem intended as a tool for the development of a bio-regenerative life support system for longterm manned missions. The MELiSSA loop is formed by five interconnected compartments, organized in three different loops (solid, liquid and gas). This compartments are microbial bioreactors and higher plant chambers. The MELiSSA Pilot Plant facility has been designed to achieve the preliminary terrestrial demonstration of the MELiSSA concept at pilot scale, using animals as a model for the crew compartent. The experience gained in the operation of such a facility will be highly relevant for planning future life support systems in Space. In this communication, the latests developments in the MELiSSA Pilot Plant will be reported. Particularly, the completion of the design phase and instalation of all the different compartments will be discussed in detail. Each of the compartments had to be designed and constructed according to very specific characteristics, associated to the biological systems to be cultured, as part of the complete MELiSSA loop (anerobic, oxygenic, thermophilic, heterotrophic, autotrophic, axenic, photosynthetic, etc.). Additionally, the sizing of each reactor (ranging from 8 to 100 Liters, depending of each particular compartment) should compile with the global integration scenario proposed, and with the final goal of connection of all compartments to provide a demonstration of the MELiSSA concept, and generate data for the design and operation of future biological life support systems.

  6. Experimental results: Pilot plant calcine dissolution and liquid feed stability

    SciTech Connect

    Herbst, R.S.; Fryer, D.S.; Brewer, K.N.; Johnson, C.K.; Todd, T.A.

    1995-02-01

    The dissolution of simulated Idaho Chemical Processing Plant pilot plant calcines, containing none of the radioactive actinides, lanthanides or fission products, was examined to evaluate the solubility of calcine matrix materials in acidic media. This study was a necessary precursor to dissolution and optimization experiments with actual radionuclide-containing calcines. The importance of temperature, nitric acid concentration, ratio of acid volume to calcine mass, and time on the amount, as a weight percentage of calcine dissolved, was evaluated. These parameters were studied for several representative pilot plant calcine types: (1) Run No. 74 Zirconia calcine; (2) Run No. 17 Zirconia/Sodium calcine; (3) Run No. 64 Zirconia/Sodium calcine; (3) Run No. 1027 Alumina calcine; and (4) Run No. 20 Alumina/Zirconia/Sodium calcine. Statistically designed experiments with the different pilot plant calcines indicated the effect of the studied process variables on the amount of calcine dissolved decreases in the order: Acid/Calcine Ratio > Temperature > HNO{sub 3} Concentration > Dissolution Time. The following conditions are suitable to achieve greater than 90 wt. % dissolution of most Zr, Al, or Na blend calcines: (1) Maximum nitric acid concentration of 5M; (2) Minimum acid/calcine ratio of 10 mL acid/1 gram calcine; (3) Minimum dissolution temperature of 90{degrees}C; and (4) Minimum dissolution time of 30 minutes. The formation of calcium sulphate (CaSO{sub 4}) precipitates was observed in certain dissolved calcine solutions during the dissolution experiments. Consequently, a study was initiated to evaluate if and under what conditions the resulting dissolved calcine solutions would be unstable with regards to precipitate formation. The results indicate that precipitate formation in the calcine solutions prepared under the above proposed dissolution conditions are not anticipated.

  7. APS Alternative Fuel (Hydrogen) Pilot Plant - Monitoring System Report

    SciTech Connect

    James Francfort; Dimitri Hochard

    2005-07-01

    The U.S. Department of Energy’s (DOE’s) Advanced Vehicle Testing Activity (AVTA), along with Electric Transportation Applications and Arizona Pubic Service (APS), is monitoring the operations of the APS Alternative Fuel (Hydrogen) Pilot Plant to determine the costs to produce hydrogen fuels (including 100% hydrogen as well as hydrogen and compressed natural gas blends) for use by fleets and other operators of advanced-technology vehicles. The hydrogen fuel cost data will be used as benchmark data by technology modelers as well as research and development programs. The Pilot Plant can produce up to 18 kilograms (kg) of hydrogen per day by electrolysis. It can store up to 155 kg of hydrogen at various pressures up to 6,000 psi. The dispenser island can fuel vehicles with 100% hydrogen at 5,000 psi and with blends of hydrogen and compressed natural gas at 3,600 psi. The monitoring system was designed to track hydrogen delivery to each of the three storage areas and to monitor the use of electricity on all major equipment in the Pilot Plant, including the fuel dispenser island. In addition, water used for the electrolysis process is monitored to allow calculation of the total cost of plant operations and plant efficiencies. The monitoring system at the Pilot Plant will include about 100 sensors when complete (50 are installed to date), allowing for analysis of component, subsystems, and plant-level costs. The monitoring software is mostly off-the-shelve, with a custom interface. The majority of the sensors input to the Programmable Automation Controller as 4- to 20-mA analog signals. The plant can be monitored over of the Internet, but the control functions are restricted to the control room equipment. Using the APS general service plan E32 electric rate of 2.105 cents per kWh, during a recent eight-month period when 1,200 kg of hydrogen was produced and the plant capacity factor was 26%, the electricity cost to produce one kg of hydrogen was $3.43. However, the

  8. Waste Isolation Pilot Plant 2001 Site Environmental Report

    SciTech Connect

    Westinghouse TRU Solutions, Inc.

    2002-09-20

    The United States (U.S.) Department of Energy's (DOE) Carlsbad Field Office (CBFO) and Westinghouse TRU Solutions LLC (WTS) are dedicated to maintaining high quality management of Waste Isolation Pilot Plant (WIPP) environmental resources. DOE Order 5400.1, General Environmental Protection Program, and DOE Order 231.1, Environmental, Safety, and Health Reporting, require that the environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This Waste Isolation Pilot Plant 2001 Site Environmental Report summarizes environmental data from calendar year (CY) 2001 that characterize environmental management performance and demonstrate compliance with federal and state regulations. This report was prepared in accordance with DOE Order 5400.1, DOE Order 231.1, the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH- 0173T), and the Waste Isolation Pilot Plant Environmental Protection Implementation Plan (DOE/WIPP 96-2199). The above Orders and guidance documents require that DOE facilities submit an annual site environmental report to DOE Headquarters, Office of the Assistant Secretary for Environment, Safety, and Health; and the New Mexico Environment Department (NMED). The purpose of this report is to provide a comprehensive description of operational environmental monitoring activities, to provide an abstract of environmental activities conducted to characterize site environmental management performance to confirm compliance with environmental standards and requirements, and to highlight significant programs and efforts of environmental merit at WIPP during CY 2001. WIPP received its first shipment of waste on March 26, 1999. In 2001, no evidence was found of any adverse effects from WIPP on the surrounding environment.

  9. Waste Isolation Pilot Plant CY 2000 Site Environmental Report

    SciTech Connect

    Westinghouse TRU Solutions, LLC; Environmental Science and Research Foundation, Inc.

    2001-12-31

    The U.S. Department of Energy's (DOE) Carlsbad Field Office and Westinghouse TRU Solutions, LLC (WTS) are dedicated to maintaining high quality management of Waste Isolation Pilot Plant (WIPP) environmental resources. DOE Order 5400.1, General Environmental Protection Program, and DOE Order 231.1, Environmental, Safety, and Health Reporting, require that the environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This Waste Isolation Pilot Plant 2000 Site Environmental Report summarizes environmental data from calendar year (CY) 2000 that characterize environmental management performance and demonstrate compliance with federal and state regulations. This report was prepared in accordance with DOE Order 5400.1, DOE Order 231.1, the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T), and the Waste Isolation Pilot Plant Environmental Protect ion Implementation Plan (DOE/WIPP 96-2199). The above orders and guidance documents require that DOE facilities submit an Annual Site Environmental Report to DOE Headquarters, Office of the Assistant Secretary for Environment, Safety, and Health. The purpose of this report is to provide a comprehensive description of operational environmental monitoring activities, to provide an abstract of environmental activities conducted to characterize site environmental management performance to confirm compliance with environmental standards and requirements, and to highlight significant programs and efforts of environmental merit at WIPP during CY 2000. The format of this report follows guidance offered in a June 1, 2001 memo from DOE's Office of Policy and Guidance with the subject ''Guidance for the preparation of Department of Energy (DOE) Annual Site Environmental Reports (ASERs) for Calendar Year 2000.'' WIPP received its first shipment of waste on March 26, 1999. In 2000, no evidence was found of any adverse

  10. Waste Isolation Pilot Plant 1999 Site Environmental Report

    SciTech Connect

    Evans, Roy B.; Adams, Amy; Martin, Don; Morris, Randall C.; Reynolds, Timothy D.; Warren, Ronald W.

    2000-09-30

    The U.S. Department of Energy's (DOE)Carlsbad Area Office and the Westinghouse Waste Isolation Division (WID) are dedicated to maintaining high quality management of Waste Isolation Pilot Plant (WIPP) environmental resources. DOE Order 5400.1, General Environmental Protection Program, and DOE Order 231.1, Environmental, Safety, and Health Reporting, require that the environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This Waste Isolation Pilot Plant 1999 Site Environmental Report summarizes environmental data from calendar year 1999 that characterize environmental management performance and demonstrate compliance with federal and state regulations. This report was prepared in accordance with DOE Order 5400.1, DOE Order 231.1, the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH- 0173T), and the Waste Isolation Pilot Plant Environmental Protection Implementation Plan (DOE/WIPP 96-2199). The above orders and guidance documents require that DOE facilities submit an Annual Site Environmental Report to DOE Headquarters, Office of the Assistant Secretary for Environment, Safety, and Health. The purpose of this report is to provide a comprehensive description of operational environmental monitoring activities, to provide an abstract of environmental activities conducted to characterize site environmental management performance to confirm compliance with environmental standards and requirements, and to highlight significant programs and efforts of environmental merit at WIPP during calendar year 1999. WIPP received its first shipment of waste on March 26, 1999. In 1999, no evidence was found of any adverse effects from WIPP on the surrounding environment. Radionuclide concentrations in the environment surrounding WIPP were not statistically higher in 1999 than in 1998.

  11. High Temperature Calcination - MACT Upgrade Equipment Pilot Plant Test

    SciTech Connect

    Richard D. Boardman; B. H. O'Brien; N. R. Soelberg; S. O. Bates; R. A. Wood; C. St. Michel

    2004-02-01

    About one million gallons of acidic, hazardous, and radioactive sodium-bearing waste are stored in stainless steel tanks at the Idaho Nuclear Technology and Engineering Center (INTEC), which is a major operating facility of the Idaho National Engineering and Environmental Laboratory. Calcination at high-temperature conditions (600 C, with alumina nitrate and calcium nitrate chemical addition to the feed) is one of four options currently being considered by the Department of Energy for treatment of the remaining tank wastes. If calcination is selected for future processing of the sodium-bearing waste, it will be necessary to install new off-gas control equipment in the New Waste Calcining Facility (NWCF) to comply with the Maximum Achievable Control Technology (MACT) standards for hazardous waste combustors and incinerators. This will require, as a minimum, installing a carbon bed to reduce mercury emissions from their current level of up to 7,500 to <45 {micro}g/dscm, and a staged combustor to reduce unburned kerosene fuel in the off-gas discharge to <100 ppm CO and <10 ppm hydrocarbons. The staged combustor will also reduce NOx concentrations of about 35,000 ppm by 90-95%. A pilot-plant calcination test was completed in a newly constructed 15-cm diameter calciner vessel. The pilot-plant facility was equipped with a prototype MACT off-gas control system, including a highly efficient cyclone separator and off-gas quench/venturi scrubber for particulate removal, a staged combustor for unburned hydrocarbon and NOx destruction, and a packed activated carbon bed for mercury removal and residual chloride capture. Pilot-plant testing was performed during a 50-hour system operability test January 14-16, followed by a 100-hour high-temperature calcination pilot-plant calcination run January 19-23. Two flowsheet blends were tested: a 50-hour test with an aluminum-to-alkali metal molar ratio (AAR) of 2.25, and a 50-hour test with an AAR of 1.75. Results of the testing

  12. Waste Isolation Pilot Plant Biennial Environmental Compliance Report

    SciTech Connect

    Washington Regulatory and Environmental Services

    2004-10-25

    This Biennial Environmental Compliance Report (BECR) documents environmental regulatory compliance at the Waste Isolation Pilot Plant (WIPP), a facility designed and authorized for the safe disposal of transuranic (TRU) radioactive waste, for the reporting period of April 1, 2002, to March 31, 2004. As required by the WIPP Land Withdrawal Act (LWA) (Public Law [Pub. L.] 102-579, as amended by Pub. L. 104-201), the BECR documents U.S. Department of Energy (DOE) compliance with applicable environmental protection laws and regulations implemented by agencies of the federal government and the state of New Mexico.

  13. Waste Isolation Pilot Plant Annual Site Environmental Report for 2012

    SciTech Connect

    2013-09-01

    The purpose of the Waste Isolation Pilot Plant (WIPP) Annual Site Environmental Report for 2012 (ASER) is to provide information required by U.S. Department of Energy (DOE) Order 231.1B, Environment, Safety, and Health Reporting. Specifically, the ASER presents summary environmental data to: Characterize site environmental management performance; Summarize environmental occurrences and responses reported during the calendar year; Confirm compliance with environmental standards and requirements; Highlight significant environmental accomplishments, including progress toward the DOE Environmental Sustainability Goals made through implementation of the WIPP Environmental Management System (EMS).

  14. Potential environmental consequences of ocean thermal energy conversion (OTEC) plants. A workshop

    SciTech Connect

    Walsh, J.J.

    1981-05-01

    The concept of generating electrical power from the temperature difference between surface and deep ocean waters was advanced over a century ago. A pilot plant was constructed in the Caribbean during the 1920's but commercialization did not follow. The US Department of Energy (DOE) earlier planned to construct a single operational 10MWe Ocean Thermal Energy Conversion (OTEC) plant by 1986. However, Public Law P.L.-96-310, the Ocean Thermal Energy Conversion Research, Development and Demonstration Act, and P.L.-96-320, the Ocean Thermal Energy Conversion Act of 1980, now call for acceleration of the development of OTEC plants, with capacities of 100 MWe in 1986, 500 MWe in 1989, and 10,000 MWe by 1999 and provide for licensing and permitting and loan guarantees after the technology has been demonstrated.

  15. Water Treatment Pilot Plant Design Manual: Low Flow Conventional/Direct Filtration Water Treatment Plant for Drinking Water Treatment Studies

    EPA Science Inventory

    This manual highlights the project constraints and concerns, and includes detailed design calculations and system schematics. The plant is based on engineering design principles and practices, previous pilot plant design experiences, and professional experiences and may serve as ...

  16. Space Solar Power Concepts: Demonstrations to Pilot Plants

    NASA Technical Reports Server (NTRS)

    Carrington, Connie K.; Feingold, Harvey; Howell, Joe T. (Technical Monitor)

    2002-01-01

    The availability of abundant, affordable power where needed is a key to the future exploration and development of space as well as future sources of clean terrestrial power. One innovative approach to providing such power is the use of wireless power transmission (WPT). There are at least two possible WPT methods that appear feasible; microwave and laser. Microwave concepts have been generated, analyzed and demonstrated. Technologies required to provide an end-to-end system have been identified and roadmaps generated to guide technology development requirements. Recently, laser W T approaches have gained an increased interest. These approaches appear to be very promising and will possibly solve some of the major challenges that exist with the microwave option. Therefore, emphasis is currently being placed on the laser WPT activity. This paper will discuss the technology requirements, technology roadmaps and technology flight experiments demonstrations required to lead toward a pilot plant demonstration. Concepts will be discussed along with the modeling techniques that are used in developing them. Feasibility will be addressed along with the technology needs, issues and capabilities for particular concepts. Flight experiments and demonstrations will be identified that will pave the road from demonstrations to pilot plants and beyond.

  17. Arizona Public Service - Alternative Fuel (Hydrogen) Pilot Plant Design Report

    SciTech Connect

    James E. Francfort

    2003-12-01

    Hydrogen has promise to be the fuel of the future. Its use as a chemical reagent and as a rocket propellant has grown to over eight million metric tons per year in the United States. Although use of hydrogen is abundant, it has not been used extensively as a transportation fuel. To assess the viability of hydrogen as a transportation fuel and the viability of producing hydrogen using off-peak electric energy, Pinnacle West Capital Corporation (PNW) and its electric utility subsidiary, Arizona Public Service (APS) designed, constructed, and operates a hydrogen and compressed natural gas fueling station—the APS Alternative Fuel Pilot Plant. This report summarizes the design of the APS Alternative Fuel Pilot Plant and presents lessons learned from its design and construction. Electric Transportation Applications prepared this report under contract to the U.S. Department of Energy’s Advanced Vehicle Testing Activity. The Idaho National Engineering and Environmental Laboratory manages these activities for the Advanced Vehicle Testing Activity.

  18. Modeling temperature variations in a pilot plant thermophilic anaerobic digester.

    PubMed

    Valle-Guadarrama, Salvador; Espinosa-Solares, Teodoro; López-Cruz, Irineo L; Domaschko, Max

    2011-05-01

    A model that predicts temperature changes in a pilot plant thermophilic anaerobic digester was developed based on fundamental thermodynamic laws. The methodology utilized two simulation strategies. In the first, model equations were solved through a searching routine based on a minimal square optimization criterion, from which the overall heat transfer coefficient values, for both biodigester and heat exchanger, were determined. In the second, the simulation was performed with variable values of these overall coefficients. The prediction with both strategies allowed reproducing experimental data within 5% of the temperature span permitted in the equipment by the system control, which validated the model. The temperature variation was affected by the heterogeneity of the feeding and extraction processes, by the heterogeneity of the digestate recirculation through the heating system and by the lack of a perfect mixing inside the biodigester tank. The use of variable overall heat transfer coefficients improved the temperature change prediction and reduced the effect of a non-ideal performance of the pilot plant modeled.

  19. Waste Isolation Pilot Plant Site Environmental Report Calendar Year 2002

    SciTech Connect

    Washington Regulatory and Environmental Services

    2003-09-17

    The United States (U.S.) Department of Energy (DOE) Carlsbad Field Office (CBFO) and Washington TRU Solutions LLC (WTS) are dedicated to maintaining high quality management of Waste Isolation Pilot Plant (WIPP) environmental resources. DOE Order 5400.1, General Environmental Protection Program, and DOE Order 231.1, Environment, Safety, and Health Reporting, require that the environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This Waste Isolation Pilot Plant 2002 Site Environmental Report summarizes environmental data from calendar year 2002 that characterize environmental management performance and demonstrate compliance with federal and state regulations. This report was prepared in accordance with DOE Order 5400.1, DOE Order 231.1, and Guidance for the Preparation of DOE Annual Site Environmental Reports (ASERs) for Calendar Year 2002 (DOE Memorandum EH-41: Natoli:6-1336, April 4, 2003). These Orders and the guidance document require that DOE facilities submit an annual site environmental report to DOE Headquarters, Office of the Assistant Secretary for Environment, Safety, and Health; and the New Mexico Environment Department (NMED).

  20. SOUTH ELEVATION OF HOT PILOT PLANT (CPP640) LOOKING NORTH. INL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    SOUTH ELEVATION OF HOT PILOT PLANT (CPP-640) LOOKING NORTH. INL PHOTO NUMBER HD-22-3-1. Mike Crane, Photographer, 11/1998 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  1. [Pilot plant and experimental laboratory production. The role in biotechnology industry development].

    PubMed

    Volkov, H L

    2000-01-01

    A stage-phase approach can contribute to unnecessarily long product development time. A simultaneous approach that integrates all development resources through an effectively managed pilot plant can significantly shorten the product development cycle. An intensive development of the domestic biotechnology manufacturing is impossible without creation of the real pilot plant market in Ukraine.

  2. Sealing concepts for the Waste Isolation Pilot Plant (WIPP) site

    SciTech Connect

    Christensen, C.L.; Gulick, C.W.; Lambert, S.J.

    1982-09-01

    The Waste Isolation Pilot Plant (WIPP) facility is proposed for development in the southeast portion of the State of New Mexico. The proposed horizon is in bedded salt located approximately 2150 ft below the surface. The purpose of the WIPP is to provide an R&D facility to demonstrate the safe disposal of radioactive wastes resulting from defense activities of the United States. As such, it will include a disposal demonstration for transuranic (TRU) wastes and an experimental area to address issues associated with disposal of defense high level wastes (DHLW) in bedded salt. All DHLW used in the experiments are planned for retrieval at the termination of testing; the TRU waste can be permanently disposed of at the site after the pilot phase is complete. This report addresses only the Plugging and Sealing program, which will result in an adequate and acceptable technology for final sealing and decommissioning of the facility at the WIPP site. The actual plugging operations are intended to be conducted on a commercial industrial basis through contracts issued by the DOE. This report is one in a series that is based on a technical program of modeling, laboratory materials testing and field demonstration which will provide a defensible basis for the actual plugging operations to be conducted by the DOE for final closure of the facility.

  3. The disturbed rock zone at the Waste Isolation Pilot Plant.

    SciTech Connect

    Hansen, Francis D.

    2003-12-01

    The Disturbed Rock Zone constitutes an important geomechanical element of the Waste Isolation Pilot Plant. The science and engineering underpinning the disturbed rock zone provide the basis for evaluating ongoing operational issues and their impact on performance assessment. Contemporary treatment of the disturbed rock zone applied to the evaluation of the panel closure system and to a new mining horizon improves the level of detail and quantitative elements associated with a damaged zone surrounding the repository openings. Technical advancement has been realized by virtue of ongoing experimental investigations and international collaboration. The initial portion of this document discusses the disturbed rock zone relative to operational issues pertaining to re-certification of the repository. The remaining sections summarize and document theoretical and experimental advances that quantify characteristics of the disturbed rock zone as applied to nuclear waste repositories in salt.

  4. Preliminary seal design evaluation for the Waste Isolation Pilot Plant

    SciTech Connect

    Stormont, J C

    1988-03-01

    This report presents a preliminary evaluation of design concepts for the eventual sealing of the shafts, drifts, and boreholes at the Waste Isolation Pilot Plant Facility. The purpose of the seal systems is to limit the flow of water into, through, and out of the repository. The principal design strategy involves the consolidation of crushed or granular salt in response to the closure of the excavations in salt. Other candidate seal materials are bentonite, cementitious mixtures, and possibly asphalt. Results from in situ experiments and modeling studies, as well as laboratory materials testing and related industrial experience, are used to develop seal designs for shafts, waste storage panel entryways, non-waste containing drifts, and boreholes. Key elements of the ongoing experimental program are identified. 112 refs., 25 figs., 1 tab.

  5. Waste Isolation Pilot Plant Groundwater Protection Management Program Plan

    SciTech Connect

    Washington TRU Solutions

    2002-09-24

    U.S. Department of Energy (DOE) Order 5400.1, General Environmental Protection Program, requires each DOE site to prepare a Groundwater Protection Management Program Plan. This document fulfills the requirement for the Waste Isolation Pilot Plant (WIPP). This document was prepared by the Hydrology Section of the Westinghouse TRU Solutions LLC (WTS) Environmental Compliance Department, and it is the responsibility of this group to review the plan annually and update it every three years. This document is not, nor is it intended to be, an implementing document that sets forth specific details on carrying out field projects or operational policy. Rather, it is intended to give the reader insight to the groundwater protection philosophy at WIPP.

  6. The Waste Isolation Pilot Plant: An International Center of Excellence

    SciTech Connect

    Matthews, Mark

    2003-02-25

    The United States Department of Energy's Carlsbad Field Office (CBFO) is responsible for the successful management of transuranic radioactive waste (TRUW) in the United States. TRUW is a long-lived radioactive waste/material (LLRM). CBFO's responsibilities includes the operation of the Waste Isolation Pilot Plant (WIPP), which is a deep geologic repository for the safe disposal of U.S. defense-related TRUW and is located 42 kilometers (km) east of Carlsbad, New Mexico. WIPP is the only deep-geological disposal site for LLRM that is operating in the world today. CBFO also manages the National Transuranic Waste Program (NTP), which oversees TRU waste management from generation to disposal. As of February 2003, approximately 1500 shipments of waste have been safely transported to the WIPP, which has been operating since March 1999.

  7. Final environmental impact statement. Waste Isolation Pilot Plant

    SciTech Connect

    Not Available

    1980-10-01

    This volume contains the appendices for the Final Environmental Impact Statement for the Waste Isolation Pilot Plant (WIPP). Alternative geologic environs are considered. Salt, crystalline rock, argillaceous rock, and tuff are discussed. Studies on alternate geologic regions for the siting of WIPP are reviewed. President Carter's message to Congress on the management of radioactive wastes and the findings and recommendations of the interagency review group on nuclear waste management are included. Selection criteria for the WIPP site including geologic, hydrologic, tectonic, physicochemical compatability, and socio-economic factors are presented. A description of the waste types and the waste processing procedures are given. Methods used to calculate radiation doses from radionuclide releases during operation are presented. A complete description of the Los Medanos site, including archaeological and historic aspects is included. Environmental monitoring programs and long-term safety analysis program are described. (DMC)

  8. Bentonite as a waste isolation pilot plant shaft sealing material

    SciTech Connect

    Daemen, J.; Ran, Chongwei

    1996-12-01

    Current designs of the shaft sealing system for the Waste Isolation Pilot Plant (WIPP) propose using bentonite as a primary sealing component. The shaft sealing designs anticipate that compacted bentonite sealing components can perform through the 10,000-year regulatory period and beyond. To evaluate the acceptability of bentonite as a sealing material for the WIPP, this report identifies references that deal with the properties and characteristics of bentonite that may affect its behavior in the WIPP environment. This report reviews published studies that discuss using bentonite as sealing material for nuclear waste disposal, environmental restoration, toxic and chemical waste disposal, landfill liners, and applications in the petroleum industry. This report identifies the physical and chemical properties, stability and seal construction technologies of bentonite seals in shafts, especially in a saline brine environment. This report focuses on permeability, swelling pressure, strength, stiffness, longevity, and densification properties of bentonites.

  9. A Pilot Plant: The Fastest Path to Commercial Fusion Energy

    SciTech Connect

    Robert J. Goldston

    2010-03-03

    Considerable effort has been dedicated to determining the possible properties of a magneticconfinement fusion power plant, particularly in the U.S.1, Europe2 and Japan3. There has also been some effort to detail the development path to fusion energy, particularly in the U.S.4 Only limited attention has been given, in Japan5 and in China6, to the options for a specific device to form the bridge from the International Thermonuclear Experimental Reactor, ITER, to commercial fusion energy. Nor has much attention been paid, since 2003, to the synergies between magnetic and inertial fusion energy development. Here we consider, at a very high level, the possibility of a Qeng ≥ 1 Pilot Plant, with linear dimensions ~ 2/3 the linear dimensions of a commercial fusion power plant, as the needed bridge. As we examine the R&D needs for such a system we find significant synergies between the needs for the development of magnetic and inertial fusion energy.

  10. Waste Isolation Pilot Plant Biennial Environmental Compliance Report

    SciTech Connect

    Westinghouse TRU Solutions

    2000-12-01

    This Biennial Environmental Compliance Report (BECR) documents environmental regulatory compliance at the Waste Isolation Pilot Plant (WIPP), a facility designed for the safe disposal of transuranic (TRU) radioactive waste, for the reporting period of April 1, 1998, to March 31, 2000. As required by the WIPP Land Withdrawal Act (LWA)(Public Law [Pub. L.] 102-579, and amended by Pub. L. 104-201), the BECR documents U.S. Department of Energy (DOE) Carlsbad Area Office's (hereinafter the ''CAO'') compliance with applicable environmental protection laws and regulations implemented by agencies of the federal government and the state of New Mexico. An issue was identified in the 1998 BECR relating to a potential cross-connection between the fire-water systems and the site domestic water system. While the CAO and its managing and operating contractor (hereinafter the ''MOC'') believe the site was always in compliance with cross-connection control requirements, hardware and procedural upgrades w ere implemented in March 1999 to strengthen its compliance posture. Further discussion of this issue is presented in section 30.2.2 herein. During this reporting period WIPP received two letters and a compliance order alleging violation of certain requirements outlined in section 9(a)(1) of the LWA. With the exception of one item, pending a final decision by the New Mexico Environment Department (NMED), all alleged violations have been resolved without the assessment of fines or penalties. Non-mixed TRU waste shipments began on March 26, 1999. Shipments continued through November 26, 1999, the effective date of the Waste Isolation Pilot Plant Hazardous Waste Facility Permit (NM4890139088-TSDF). No shipments regulated under the Hazardous Waste Facility Permit were received at WIPP during this BECR reporting period.

  11. TF Inner Leg Space Allocation for Pilot Plant Design Studies

    SciTech Connect

    Peter H. Titus and Ali Zolfaghari

    2012-09-06

    A critical design feature of any tokamak is the space taken up by the inner leg of the toroidal field (TF) coil. The radial build needed for the TF inner leg, along with shield thickness , size of the central solenoid and plasma minor radius set the major radius of the machine. The cost of the tokamak core roughly scales with the cube of the major radius. Small reductions in the TF build can have a big impact on the overall cost of the reactor. The cross section of the TF inner leg must structurally support the centering force and that portion of the vertical separating force that is not supported by the outer structures. In this paper, the TF inner leg equatorial plane cross sections are considered. Out-of- Plane (OOP) forces must also be supported, but these are largest away from the equatorial plane, in the inner upper and lower corners and outboard sections of the TF coil. OOP forces are taken by structures that are not closely coupled with the radial build of the central column at the equatorial plane. The "Vertical Access AT Pilot Plant" currently under consideration at PPPL is used as a starting point for the structural, field and current requirements. Other TF structural concepts are considered. Most are drawn from existing designs such as ITER's circular conduits in radial plates bearing on a heavy nose section, and TPX's square conduits in a case, Each of these concepts can rely on full wedging, or partial wedging. Vaulted TF coils are considered as are those with some component of bucking against a central solenoid or bucking post. With the expectation that the pilot plant will be a steady state machine, a static stress criteria is used for all the concepts. The coils are assumed to be superconducting, with the superconductor not contributing to the structural strength. Limit analysis is employed to assess the degree of conservatism in the static criteria as it is applied to a linear elastic stress analysis. TF concepts, and in particular the PPPL AT

  12. Osmo-power - Theory and performance of an osmo-power pilot plant

    NASA Astrophysics Data System (ADS)

    Jellinek, H. H. G.; Masuda, H.

    A theoretical and experimental study of the production of useful energy by the natural process of osmosis is presented. Using the results of the study a conceptual design of an osmotic pilot plant is performed. The power produced by a 1.6 MW/sq km plant has a competitive cost with that produced by both fossil power plants and nuclear power plants.

  13. Integrated Pilot Plant for a Large Cold Crucible Induction Melter

    SciTech Connect

    Do Quang, R.; Jensen, A.; Prod'homme, A.; Fatoux, R.; Lacombe, J.

    2002-02-26

    COGEMA has been vitrifying high-level liquid waste produced during nuclear fuel reprocessing on an industrial scale for over 20 years, with two main objectives: containment of the long lived fission products and reduction of the final volume of waste. Research performed by the French Atomic Energy Commission (CEA) in the 1950s led to the selection of borosilicate glass as the most suitable containment matrix for waste from spent nuclear fuel and to the development of the induction melter technology. This was followed by the commissioning of the Marcoule Vitrification Facility (AVM) in 1978. The process was implemented at a larger scale in the late 1980s in the R7 and T7 facilities of the La Hague reprocessing plant. COGEMA facilities have produced more than 11,000 high level glass canisters, representing more than 4,500 metric tons of glass and 4.5 billion curies. To further improve the performance of the vitrification lines in the R7 and T7 facilities, the CEA and COGEMA have been developing the Cold Crucible Melter (CCM) technology since the 1980s. This technology benefits from the 20 years of COGEMA HLW vitrification experience and ensures a virtually unlimited equipment service life and extensive flexibility in dealing with different types of waste. The high specific power directly transferred by induction to the melt allows high operating temperatures without any impact on the process equipment. In addition, the mechanical stirring of the melter significantly reduces operating constraints. COGEMA is already providing the CCM technology to international customers for nuclear and non-nuclear applications and plans to implement it in the La Hague vitrification plant for the vitrification of highly concentrated and corrosive solutions produced by uranium/molybdenum fuel reprocessing. The paper presents the CCM project that led to the building and start-up of this evolutionary and flexible pilot plant. It also describes the plant's technical characteristics and

  14. Process performance of Ahlstrom Pyroflow PCFB pilot plant

    SciTech Connect

    Sellakumar, K.M.; Isaksson, J.; Tiensuu, J.

    1993-05-01

    Ahlstrom Pyropower has designed and built a 10 MW{sub th} (34 MMBtu) pressurized circulating fluidized bed (PCFB) pilot plant in Karhula, Finland. The unit is now operating. Data from this unit supports the design of a nominal 80 MW, Des Moines Energy Center 1 (DMEC-1) PCFB Repowering Project. The pilot plant PCFB combustor is of square cross-section. It is housed in a 3.6 m (11.8 ft) diameter pressure vessel. A high pressure high temperature gas cleaning unit downstream of the PCFB exhaust is installed in a separate 2.6 m (8.5 ft) diameter pressure vessel. The maximum plant operating pressure is 16 bar (232 psia). The fuel is fed in slurry form; sorbent is also fed along with the fuel. The net heat input per unit cross section of the combustor is the highest of any known combustion mode. The heat release can go up to 40 MW/m{sup 2} (12.6 MMBtu/ft{sup 2} hr). Many types of coals including high sulfur, bituminous Illinois No. 6 coal and Western sub bituminous, low sulfur Powder River Basin coal were tested. Combustion efficiencies in the range of 99.5 to 99.9% have been consistently observed. Emissions of various gases such as NO{sub x} SO{sub 2} and CO at different operating pressures and loads were monitored. The gas emissions have been lower than expected based on atmospheric circulating fluidized bed boiler experience. The sulfur retention is over 95 % with a Ca/S molar ratio of 1 to 2 for high sulfur Illinois No.6 coal. A GAVS molar ratio of 2.5 to 3.5 was observed to retain 95 % of sulfur with low sulfur Powder River Basin coal. All gaseous emissions during testing with Illinois No. 6 coal and Powder River Basin coal are well within the projected limits for the DMEC1 project. Emission data from tests with Illinois No. 6 coal and Powder River Basin coal are presented in the paper.

  15. Process performance of Ahlstrom Pyroflow PCFB pilot plant

    SciTech Connect

    Sellakumar, K.M. ); Isaksson, J.; Tiensuu, J. . Hans Ahlstroem Lab.)

    1993-05-01

    Ahlstrom Pyropower has designed and built a 10 MW[sub th] (34 MMBtu) pressurized circulating fluidized bed (PCFB) pilot plant in Karhula, Finland. The unit is now operating. Data from this unit supports the design of a nominal 80 MW, Des Moines Energy Center 1 (DMEC-1) PCFB Repowering Project. The pilot plant PCFB combustor is of square cross-section. It is housed in a 3.6 m (11.8 ft) diameter pressure vessel. A high pressure high temperature gas cleaning unit downstream of the PCFB exhaust is installed in a separate 2.6 m (8.5 ft) diameter pressure vessel. The maximum plant operating pressure is 16 bar (232 psia). The fuel is fed in slurry form; sorbent is also fed along with the fuel. The net heat input per unit cross section of the combustor is the highest of any known combustion mode. The heat release can go up to 40 MW/m[sup 2] (12.6 MMBtu/ft[sup 2] hr). Many types of coals including high sulfur, bituminous Illinois No. 6 coal and Western sub bituminous, low sulfur Powder River Basin coal were tested. Combustion efficiencies in the range of 99.5 to 99.9% have been consistently observed. Emissions of various gases such as NO[sub x] SO[sub 2] and CO at different operating pressures and loads were monitored. The gas emissions have been lower than expected based on atmospheric circulating fluidized bed boiler experience. The sulfur retention is over 95 % with a Ca/S molar ratio of 1 to 2 for high sulfur Illinois No.6 coal. A GAVS molar ratio of 2.5 to 3.5 was observed to retain 95 % of sulfur with low sulfur Powder River Basin coal. All gaseous emissions during testing with Illinois No. 6 coal and Powder River Basin coal are well within the projected limits for the DMEC1 project. Emission data from tests with Illinois No. 6 coal and Powder River Basin coal are presented in the paper.

  16. Meteorological data for SRI study of mesoscale weather effects by pilot plant

    SciTech Connect

    Not Available

    1980-05-07

    The data required to estimate the probability of occurrence of initial meteorological conditions leading to an effect on the weather by the pilot solar thermal electric plant are discussed. No completely appropriate data summaries are available. Vertical atmospheric profiles are the most appropriate source of raw data for a statistical analysis, but these are not available from the pilot plant location either. The available stability data for the pilot plant site are presented. A procedure is outlined to obtain the required estimates of occurrence frequency if desired. However, it is recommended that more substantial effects be demonstrated with a physically realistic model before great effort is expended on data analysis.

  17. Controller Design Based on Nonlinear Separation Control Method for OTEC Pilot Plant

    NASA Astrophysics Data System (ADS)

    Nakamura, Masatoshi; Sugi, Takenao; Ikegami, Yasuyuki; Uehara, Haruo

    An OTEC (Ocean Thermal Energy Conversion) pilot plant consists of two parts; an OTEC system of main part and a heat reservoir system of sub part. The nonlinear separation control method was applied to the controller design for the OTEC pilot plant. The nonlinear separation models were constructed for the OTEC system and the heat reservoir system. The controller for the OTEC system and the heat reservoir system was designed by using the both nonlinear separation models. A detail simulation study showed that the multi-layer controller for the OTEC pilot plant brought a satisfactory control performance by comparing a conventional PI control.

  18. Waste Isolation Pilot Plant Annual Site Enviromental Report for 2008

    SciTech Connect

    Washington Regulatory and Enviromnetal Services

    2009-09-21

    The purpose of the Waste Isolation Pilot Plant Annual Site Environmental Report for 2008 (ASER) is to provide information required by U.S. Department of Energy (DOE) Order 231.1A, Environment, Safety, and Health Reporting. Specifically, the ASER presents summary environmental data to characterize site environmental management performance; summarize environmental occurrences and responses reported during the calendar year; confirm compliance with environmental standards and requirements; highlight significant facility programs and efforts; and describe how compliance and environmental improvement is accomplished through the WIPP Environmental Management System (EMS). The DOE Carlsbad Field Office (CBFO) and the management and operating contractor (MOC), Washington TRU Solutions LLC (WTS), maintain and preserve the environmental resources at the Waste Isolation Pilot Plant (WIPP). DOE Order 231.1A; DOE Order 450.1A, Environmental Protection Program; and DOE Order 5400.5, Radiation Protection of the Public and the Environment, require that the affected environment at and near DOE facilities be monitored to ensure the safety and health of the public and workers, and preservation of the environment. This report was prepared in accordance with DOE Order 231.1A, which requires that DOE facilities submit an ASER to the DOE Headquarters Chief Health, Safety, and Security Officer. The WIPP Hazardous Waste Facility Permit (HWFP) Number NM4890139088-TSDF (treatment, storage, and disposal facility) further requires that the ASER be provided to the New Mexico Environment Department (NMED). The WIPP mission is to safely dispose of transuranic (TRU) radioactive waste generated by the production of nuclear weapons and other activities related to the national defense of the United States. In 2008, 5,265 cubic meters (m3) of TRU waste were disposed of at the WIPP facility, including 5,216 m3 of contact-handled (CH) TRU waste and 49 m3 of remote-handled (RH) TRU waste. From the first

  19. Waste Isolation Pilot Plant No-migration variance petition. Addendum: Volume 7, Revision 1

    SciTech Connect

    Not Available

    1990-03-01

    This report describes various aspects of the Waste Isolation Pilot Plant (WIPP) including design data, waste characterization, dissolution features, ground water hydrology, natural resources, monitoring, general geology, and the gas generation/test program.

  20. Regulatory basis for the Waste Isolation Pilot Plant performance assessment

    SciTech Connect

    HOWARD,BRYAN A.; CRAWFORD,M.B.; GALSON,D.A.; MARIETTA,MELVIN G.

    2000-05-22

    The Waste Isolation Pilot Plant (WIPP) is the first operational repository designed for the safe disposal of transuranic (TRU) radioactive waste from the defense programs of the US Department of Energy (DOE). The US Environmental Protection Agency (EPA) is responsible for certifications and regulation of the WIPP facility for the radioactive components of the waste. The EPA has promulgated general radioactive waste disposal standards at 40 CFR Part 191. and WIPP-specific criteria to implement and interpret the generic disposal standards at 40 CFR Part 194. In October 1996. the DOE submitted its Compliance Certification Application (CCA) to the EPA to demonstrate compliance with the disposal standards at Subparts B and C of 40 CFR Part 191. This paper summarizes the development of the overall legal framework for radioactive waste disposal at the WIPP, the parallel development of the WIPP performance assessment (PA), and how the EPA disposal standards and implementing criteria formed the basis for the CCA WIPP PA. The CCA resulted in a certification in May 1998 by the EPA of the WIPP'S compliance with the EPA's disposal standard, thus enabling the WIPP to begin radioactive waste disposal.

  1. Key Geomechanics Issues at the Waste Isolation Pilot Plant Geomechanics

    SciTech Connect

    HANSEN,FRANCIS D.

    1999-09-01

    Mechanical and hydrological properties of rock salt provide excellent bases for geological isolation of hazardous materials. Regulatory compliance determinations for the Waste Isolation Pilot Plant (WIPP) stand as testament to the widely held conclusion that salt provides excellent isolation properties. The WIPP saga began in the 1950s when the U.S. National Academy of Sciences (NAS) recommended a salt vault as a promising solution to the national problem of nuclear waste disposal. For over 20 years, the Scientific basis for the NAS recommendation has been fortified by Sandia National Laboratories through a series of large scale field tests and laboratory investigations of salt properties. These scientific investigations helped develop a comprehensive understanding of salt's 4 reformational behavior over an applicable range of stresses and temperatures. Sophisticated constitutive modeling, validated through underground testing, provides the computational ability to model long-term behavior of repository configurations. In concert with advancement of the mechanical models, fluid flow measurements showed not only that the evaporite lithology was essentially impermeable but that the WIPP setting was hydrologically inactive. Favorable mechanical properties ensure isolation of materials placed in a salt geological setting. Key areas of the geomechanics investigations leading to the certification of WIPP are in situ experiments, laboratory tests, and shaft seal design.

  2. Mechanical compaction of Waste Isolation Pilot Plant simulated waste

    SciTech Connect

    Butcher, B.M. ); Thompson, T.W.; VanBuskirk, R.G.; Patti, N.C. )

    1991-06-01

    The investigation described in this report acquired experimental information about how materials simulating transuranic (TRU) waste compact under axial compressive stress, and used these data to define a model for use in the Waste Isolation Pilot Plant (WIPP) disposal room analyses. The first step was to determine compaction curves for various simultant materials characteristic of TRU waste. Stress-volume compaction curves for various combinations of these materials were than derived to represent the combustible, metallic, and sludge waste categories. Prediction of compaction response in this manner is considered essential for the WIPP program because of the difficulties inherent in working with real (radioactive) waste. Next, full-sized 55-gallon drums of simulated combustible, metallic, and sludge waste were axially compacted. These results provided data that can be directly applied to room consolidation and data for comparison with the predictions obtained in Part 1 of the investigation. Compaction curves, which represent the combustible, metallic, and sludge waste categories, were determined, and a curve for the averaged waste inventory of the entire repository was derived. 9 refs., 31 figs., 12 tabs.

  3. Waste Isolation Pilot Plant Land Withdrawal Act of 1988

    SciTech Connect

    Not Available

    1988-01-01

    The Committee on Energy and Natural Resources reports on the Bill S. 1272 and recommends passage of the bill as amended by the Committee. S. 1272 as amended withdraws 10,240 acres of land in Eddy county, New Mexico for the exclusive use of the Department of Energy (DOE) for construction, operation, decommissioning and post-decommissioning control of the Waste Isolation Pilot Plant (WIPP). The lands, currently managed by the Department of the Interior, would be permanently withdrawn and transferred to the control of DOE. The bill sets forth specific instructions to the Secretary of Energy to preserve the ecology of these lands and mandates compliance with standards of the Environmental Protection Agency (EPA) for storage and disposal of transuranium radioactive waste as set forth in 40 C.F.R. Part 191. In addition to the section-by-section analysis of the bill, a cost estimate from the Congressional Budget Office and copies of communications received by the Committee from DOE and the Department of the Interior setting forth executive recommendations relating to the bill are included.

  4. The determination of residence times in a pilot plant

    NASA Astrophysics Data System (ADS)

    Ramírez, F. Pablo; Cortés, M. Eugenia

    2004-01-01

    It is well known that residence time distributions (RTD) are very important in many chemical processes such as separation, reforming, hydrocracking, fluid catalytic cracking, hydrodesulfuration, hydrogenation among others [3 Procédés de transformation, Editions Technip, Institute Francais du Petrole, Paris, France, 1998]. In addition, tracers can be used to measure the velocity, distribution and residence time of any stream through any part of an industrial [Guidebook on Radioisotope Tracers in Industry, IAEA, Vienna, 1990] or experimental system. Perhaps the best quality of radiotracers is that they do not interfere with normal unit operations or production scheduling. In this paper are presented the RTDs obtained in a pilot plant for a hydrogenation process [IMP, Technical Report, Determinación del tiempo de residencia promedio en el reactor de la planta piloto de hidroagotamiento de crudo, 2002]. The RTDs show a random phenomenon, which is not typical of this type of chemical processes. Several RTDs were determined in order to confirm this random behavior. The data were obtained using as a tracer a radioactive form of sodium iodide containing iodine-131 [The Condensed Chemical Dictionary, 10th Ed., Van Nostrand Reinhold, USA, 1981]. The process works with two phases in a countercurrent flow, inside a packed column. The liquid phase goes down by gravity. The gas phase goes up due to pressure difference [3 Procédés de transformation, Editions Technip, Institute Francais du Petrole, Paris, France, 1998]. The tracer was selected such that it would follow the liquid phase.

  5. Waste Isolation Pilot Plant Annual Site Environmental Report for 2010

    SciTech Connect

    2011-09-01

    The purpose of the Waste Isolation Pilot Plant (WIPP) Annual Site Environmental Report for 2010 (ASER) is to provide information required by U.S. Department of Energy (DOE) Order 231.1A, Environment, Safety, and Health Reporting. Specifically, the ASER presents summary environmental data to: (1) Characterize site environmental management performance. (2) Summarize environmental occurrences and responses reported during the calendar year. (3) Confirm compliance with environmental standards and requirements. (4) Highlight significant environmental accomplishments, including progress toward the DOE Environmental Sustainability Goals made through implementation of the WIPP Environmental Management System (EMS). The DOE Carlsbad Field Office (CBFO) and the management and operating contractor (MOC), Washington TRU Solutions LLC (WTS), maintain and preserve the environmental resources at the WIPP. DOE Order 231.1A; DOE Order 450.1A, Environmental Protection Program; and DOE Order 5400.5, Radiation Protection of the Public and the Environment, require that the affected environment at and near DOE facilities be monitored to ensure the safety and health of the public and workers, and preservation of the environment. This report was prepared in accordance with DOE Order 231.1A, which requires that DOE facilities submit an ASER to the DOE Headquarters Chief Health, Safety, and Security Officer. The WIPP Hazardous Waste Facility Permit Number NM4890139088-TSDF (Permit) further requires that the ASER be provided to the New Mexico Environment Department (NMED).

  6. A historical review of Waste Isolation Pilot Plant backfill development

    SciTech Connect

    KRUMHANSL,JAMES L.; MOLECKE,MARTIN A.; PAPENGUTH,HANS W.; BRUSH,LAURENCE H.

    2000-06-05

    Backfills have been part of Sandia National Laboratories' [Sandia's] Waste Isolation Pilot Plant [WIPP] designs for over twenty years. Historically, backfill research at Sandia has depended heavily on the changing mission of the WIPP facility. Early testing considered heat producing, high level, wastes. Bentonite/sand/salt mixtures were evaluated and studies focused on developing materials that would retard brine ingress, sorb radionuclides, and withstand elevated temperatures. The present-day backfill consists of pure MgO [magnesium oxide] in a pelletized form and is directed at treating the relatively low contamination level, non-heat producing, wastes actually being disposed of in the WIPP. Its introduction was motivated by the need to scavenging CO{sub 2} [carbon dioxide] from decaying organic components in the waste. However, other benefits, such as a substantial desiccating capacity, are also being evaluated. The MgO backfill also fulfills a statutory requirement for assurance measures beyond those needed to demonstrate compliance with the US Environmental Protection Agency [EPA] regulatory release limits. However, even without a backfill, the WIPP repository design still operates within EPA regulatory release limits.

  7. Waset Isolation Pilot Plant Annual Site Environmental Report for 2006

    SciTech Connect

    Washington Regulatory and Environmental Services; Washington TRU Solutions LLC

    2007-09-26

    The purpose of the Waste Isolation Pilot Plant Annual Site Environmental Report for 2006 (ASER) is to provide information required by U.S. Department of Energy (DOE) Order 231.1A, Environment, Safety, and Health Reporting. Specifically, the ASER presents summary environmental data that: (a) Characterize site environmental management performance; (b) Summarize environmental occurrences and responses reported during the calendar year; (c) Confirm compliance with environmental standards and requirements; and (d) Highlight significant facility programs and efforts. The DOE Carlsbad Field Office (CBFO) and Washington TRU Solutions LLC (WTS) maintain and preserve the environmental resources at the WIPP site. DOE Order 231.1A; DOE Order 450.1, Environmental Protection Program; and DOE Order 5400.5, Radiation Protection of the Public and Environment, require that the affected environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This report was prepared in accordance with DOE Order 231.1A. This order requires that DOE facilities submit an ASER to the DOE Headquarters Office of the Assistant Secretary for Environment, Safety, and Health. The WIPP Hazardous Waste Facility Permit (HWFP) (No. NM4890139088-TSDF [treatment, storage, and disposal facility]) further requires that the ASER be provided to the New Mexico Environment Department (NMED).

  8. Summary of scientific investigations for the Waste Isolation Pilot Plant

    SciTech Connect

    Weart, W.D.

    1996-02-01

    The scientific issues concerning disposal of radioactive wastes in salt formations have received 40 years of attention since the National Academy of Sciences (NAS) first addressed this issue in the mid-50s. For the last 21 years, Sandia National Laboratories (SNL) have directed site specific studies for the Waste Isolation Pilot Plant (WIPP). This paper will focus primarily on the WIPP scientific studies now in their concluding stages, the major scientific controversies regarding the site, and some of the surprises encountered during the course of these scientific investigations. The WIPP project`s present understanding of the scientific processes involved continues to support the site as a satisfactory, safe location for the disposal of defense-related transuranic waste and one which will be shown to be in compliance with Environmental Protection Agency (EPA) standards. Compliance will be evaluated by incorporating data from these experiments into Performance Assessment (PA) models developed to describe the physical and chemical processes that could occur at the WIPP during the next 10,000 years under a variety of scenarios. The resulting compliance document is scheduled to be presented to the EPA in October 1996 and all relevant information from scientific studies will be included in this application and the supporting analyses. Studies supporting this compliance application conclude the major period of scientific investigation for the WIPP. Further studies will be of a ``confirmatory`` and monitoring nature.

  9. Installation of the Pulse-Plate Column Pilot Plant

    SciTech Connect

    Nick R. Mann

    2009-07-01

    There are three primary types of solvent extraction equipment utilized in the nuclear industry for reprocessing of used nuclear fuel; pulse columns, mixer-settlers, and centrifugal contactors. Considerable research and development has been performed at the INL and throughout the DOE complex on the application of centrifugal contactors for used fuel reprocessing and these contactors offer many significant advantages. However, pulse columns have been used extensively in the past in throughout the world for aqueous separations processes and remain the preferred equipment by many commercial entities. Therefore, a pulse-plate column pilot plant has been assembled as part of the Advanced Fuel Cycle Initiative to support experimentation and demonstration of pulse column operation. This will allow the training of personnel in the operation of pulse columns. Also, this capability will provide the equipment to allow for research to be conducted in the operation of pulse columns with advanced solvents and processes developed as part of the fuel cycle research and development being performed in the AFCI program.

  10. Experimental program plan for the Waste Isolation Pilot Plant

    SciTech Connect

    Not Available

    1994-01-01

    The US Department of Energy has prepared this Experimental Program Plan for the Waste Isolation Pilot Plant (EPP) to provide a summary of the DOE experimental efforts needed for the performance assessment process for the WIPP, and of the linkages of this process to the appropriate regulations. The Plan encompasses a program of analyses of the performance of the planned repository based on scientific studies, including tests with transuranic waste at laboratory sites, directed at evaluating compliance with the principal regulations governing the WIPP. The Plan begins with background information on the WIPP project, the requirements of the LWA (Land Withdrawal Act), and its objective and scope. It then presents an overview of the regulatory requirements and the compliance approach. Next are comprehensive discussions of plans for compliance with disposal regulations, followed by the SWDA (Solid Waste Disposal Act) and descriptions of activity programs designed to provide information needed for determining compliance. Descriptions and justifications of all currently planned studies designed to support regulatory compliance activities are also included.

  11. Compliance status report for the Waste Isolation Pilot Plant

    SciTech Connect

    Not Available

    1994-03-31

    The US Department of Energy (DOE) is responsible for the disposition of transuranic (TRU) waste generated through national defense-related activities. Approximately 53,700 m{sup 2} of these wastes have been generated and are currently stored at government defense installations across the country. The Waste Isolation Pilot Plant (WIPP), located in southeastern New Mexico, has been sited and constructed to meet the criteria established by the scientific and regulatory community for the safe, long-term disposal of TRU and TRU-mixed wastes. This Compliance Status Report (CSR) provides an assessment of the progress of the WIPP Program toward compliance with long-term disposal regulations, set forth in Title 40 CFR 191 (EPA, 1993a), Subparts B and C, and Title 40 CFR {section}268.6 (EPA, 1993b), in order to focus on-going and future experimental and engineering activities. The CSR attempts to identify issues associated with the performance of the WIPP as a long-term repository and to focus on the resolution of these issues. This report will serve as a tool to focus project resources on the areas necessary to ensure complete, accurate, and timely submittal of the compliance application. This document is not intended to constitute a statement of compliance or a demonstration of compliance.

  12. Waste Isolation Pilot Plant (WIPP) Waste Information System (Public Access)

    DOE Data Explorer

    The Waste Isolation Pilot Plant (WIPP) is a DOE facility located in the desert outside Carlsbad, New Mexico. Its mission is to safely dispose of defense-related transuranic radioactive waste. Disposal ôroomsö are carved out of the Permian Salt Formation deep below the desertÆs surface. The WIPP Waste Information Service (WWIS) was established in accordance with an Agreement between the United States Department of Energy and the New Mexico Environment Department, dated February 11, 2005, Docket Number HWB 04-07 (CO). The service provides information the containers emplaced at WIPP and the waste products they hold. The public may query by shipment number, location of waste stream or location of the container after it is placed at WIPP, date placed, and Haz Codes or other information about the waste stream profiles. For example, choosing the waste stream identified as ID-SDA-SLUDGE reveals that it may contain more than 20 chemical waste products, including arsenic, spent halogenated solvents, potassium cyanide, and chloroform. The system then tells you each numbered container that has this kind of sludge. Container data is available within 14 days after the containerÆs emplacement in the WIPP Repository.

  13. Waste Isolation Pilot Plant Biennial Environmental Compliance Report

    SciTech Connect

    Washington Regulatory and Environmental Services

    2006-10-12

    This Biennial Environmental Compliance Report (BECR) documents compliance with environmental regulations at the Waste Isolation Pilot Plant (WIPP), a facility designed and authorized for the safe disposal of transuranic (TRU) radioactive waste. This BECR covers the reporting period from April 1, 2004, to March 31, 2006. As required by the WIPP Land Withdrawal Act (LWA) (Public Law [Pub. L.] 102-579, as amended by Pub. L. 104-201), the BECR documents United States (U.S.) Department of Energy (DOE) compliance with regulations and permits issued pursuant to the following: (1) Title 40 Code of Federal Regulations (CFR) Part 191, Subpart A, "Environmental Standards for Management and Storage"; (2) Clean Air Act (CAA) (42 United States Code [U.S.C.] §7401, et seq.); (3) Solid Waste Disposal Act (SWDA) (42 U.S.C. §§6901-6992, et seq.); (4) Safe Drinking Water Act (SDWA) (42 U.S.C. §§300f, et seq.); (5) Toxic Substances Control Act (TSCA) (15 U.S.C. §§2601, et seq.); (6) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) (42 U.S.C. §§9601, et seq.); and all other federal and state of New Mexico laws pertaining to public health and safety or the environment.

  14. Results of toxicological testing of Jefferson Paris pilot plant samples

    SciTech Connect

    Miller, R.G.; Kopfler, F.C.; Condie, L.W.; Pereira, M.A.; Meier, J.R.; Ringhand, H.P.; Robinson, M.; Casto, B.C.

    1986-11-01

    Five toxicological tests were performed using concentrated drinking water samples collected at a pilot-scale drinking water treatment plant that had streams treated with different disinfectants (no disinfectant, ozone, chlorine dioxide, monochloramine, or chlorine) before treatment with granular activated carbon (GAC). The toxicological tests used in this study were the Ames Salmonella assay, a subchronic in vivo toxicity assay in mice, the SENCAR mouse skin initiation-promotion assay, a rat liver foci assay, and the lung adenoma assay in strain A mice. These tests were conducted to determine the general toxicity and the mutagenic/carcinogenic potential association with the use of disinfection and/or GAC in the treatment of drinking water. Results indicated that the samples remained mutagenic for the duration of the tests. All the drinking water concentrates (4000 x) prepared by the XAD resin adsorption procedure failed to provide statistically significant indication of carcinogenic activity in the SENCAR mouse, rat liver foci, and the lung adenoma assays. However, concentrates of the chlorine, chlorine dioxide, and monochloramine treated waters gave consistent mutagenic responses in the Ames Salmonella assay. GAC was effective for 6 months in removing both the mutagenicity of chlorine-treated water and the potential of water to become mutagenic when treated with chlorine. A consistent pattern of these differences indicating overt toxicity was not detected.

  15. Performance characteristics of an MHD (Magnetohydrodynamic) pilot plant electrostatic precipitator

    NASA Astrophysics Data System (ADS)

    Lindner, J. S.; Jang, P. R.; Okhuysen, W. P.; Holt, J. K.

    In magnetohydrodynamic (MHD) power generation, a seed material, normally K2CO3, is added to enhance the conductivity of the coal-fired gas stream. The plasma is passed through a magnetic field and electricity is produced by the Hall effect. Future large scale MHD facilities are expected to be more efficient than conventional coal-fired power plants not only because of the dc electricity produced but also from increased heat recovery owing to the large (3000 K) combustion temperatures employed. There is; however, a finite cost for the seed material and the resulting K2SO4 particles (SO2 emissions are minimized by combination with seed potassium) must be collected, converted back to K2CO3 or KCO2H, and recycled back to the combustor. The performance characteristics of the MHD electrostatic precipitator (ESP) are therefore, of interest. We describe Mie scattering and electric field measurements on an MHD pilot scale ESP located at the Coal Fire Flow Facility (CFFF) at the University of Tennessee Space Institute. Results are reported for the determination of near-real-time collection efficiencies, the variation of the ESP performance with seed percentage, and initial studies on the extent of particle re-entrainment.

  16. Final Report: RPP-WTP Semi-Integrated Pilot Plant

    SciTech Connect

    Duignan, M. R.; Adamson, D. J.; Calloway, T. B.; Fowley, M. D.; Qureshi, Z. H.; Steimke, J. L.; Williams, M. R.; Zamecnik, J. R.

    2005-06-01

    In August 2004 the last of the SIPP task testing ended--a task that formally began with the issuance of the RPP-WTP Test Specification in June 2003. The planning for the task was a major effort in itself and culminated with the input of all stakeholders, DOE, Bechtel National, Inc., Washington Group International, in October 2003 at Hanford, WA (Appendix A). This report documents the activities carried out as a result of that planning. Campaign IV, the fourth and final step towards the Semi-Integrated Pilot Plant (SIPP) task, conducted by the Savannah River National Laboratory (SRNL) at the Savannah River Site, was to take the several recycle streams produced in Campaign III, the third step of the task, and combine them with other simulated recycle and chosen waste streams. (Campaign III was fed recycles from Campaign II, as Campaign II was fed by Campaign I.) The combined stream was processed in a fashion that mimicked the pretreatment operations of the DOE River Protection Project--Waste Treatment and Immobilization Plant (RPP-WTP) with the exception of the Ion Exchange Process. The SIPP task is considered semi-integrated because it only deals with the pretreatment operations of the RPP-WTP. That is, the pilot plant starts by receiving waste from the tank farm and ends when waste is processed to the point of being sent for vitrification. The resulting pretreated LAW and HLW simulants produced by the SIPP were shipped to VSL (Vitreous State Laboratory) and successfully vitrified in pilot WTP melters. Within the SIPP task these steps are referred to as Campaigns and there were four Campaigns in all. Campaign I, which is completely different than other campaigns, subjected a simulant of Hanford Tank 241-AY-102/C-106 (AY102) waste to cross-flow ultrafiltration only and in that process several important recycle streams were produced as a result of washing the simulant and cleaning the cross-flow filter. These streams were fed to subsequent campaigns and that work was

  17. Waste Isolation Pilot Plant simulated RH TRU waste experiments: Data and interpretation pilot

    SciTech Connect

    Molecke, M.A.; Argueello, G.J.; Beraun, R.

    1993-04-01

    The simulated, i.e., nonradioactive remote-handled transuranic waste (RH TRU) experiments being conducted underground in the Waste Isolation Pilot Plant (WIPP) were emplaced in mid-1986 and have been in heated test operation since 9/23/86. These experiments involve the in situ, waste package performance testing of eight full-size, reference RH TRU containers emplaced in horizontal, unlined test holes in the rock salt ribs (walls) of WIPP Room T. All of the test containers have internal electrical heaters; four of the test emplacements were filled with bentonite and silica sand backfill materials. We designed test conditions to be ``near-reference`` with respect to anticipated thermal outputs of RH TRU canisters and their geometrical spacing or layout in WIPP repository rooms, with RH TRU waste reference conditions current as of the start date of this test program. We also conducted some thermal overtest evaluations. This paper provides a: detailed test overview; comprehensive data update for the first 5 years of test operations; summary of experiment observations; initial data interpretations; and, several status; experimental objectives -- how these tests support WIPP TRU waste acceptance, performance assessment studies, underground operations, and the overall WIPP mission; and, in situ performance evaluations of RH TRU waste package materials plus design details and options. We provide instrument data and results for in situ waste container and borehole temperatures, pressures exerted on test containers through the backfill materials, and vertical and horizontal borehole-closure measurements and rates. The effects of heat on borehole closure, fracturing, and near-field materials (metals, backfills, rock salt, and intruding brine) interactions were closely monitored and are summarized, as are assorted test observations. Predictive 3-dimensional thermal and structural modeling studies of borehole and room closures and temperature fields were also performed.

  18. Final environmental impact statement. Waste Isolation Pilot Plant

    SciTech Connect

    Not Available

    1980-10-01

    In accordance with the National Environmental Policy Act (NEPA) of 1969, the US Department of Energy (DOE) has prepared this document as environmental input to future decisions regarding the Waste Isolation Pilot Plant (WIPP), which would include the disposal of transuranic waste, as currently authorized. The alternatives covered in this document are the following: (1) Continue storing transuranic (TRU) waste at the Idaho National Engineering Laboratory (INEL) as it is now or with improved confinement. (2) Proceed with WIPP at the Los Medanos site in southeastern New Mexico, as currently authorized. (3) Dispose of TRU waste in the first available repository for high-level waste. The Los Medanos site would be investigated for its potential suitability as a candidate site. This is administration policy and is the alternative preferred by the DOE. (4) Delay the WIPP to allow other candidate sites to be evaluated for TRU-waste disposal. This environmental impact statement is arranged in the following manner: Chapter 1 is an overall summary of the analysis contained in the document. Chapters 2 and 4 set forth the objectives of the national waste-management program and analyze the full spectrum of reasonable alternatives for meeting these objectives, including the WIPP. Chapter 5 presents the interim waste-acceptance criteria and waste-form alternatives for the WIPP. Chapters 6 through 13 provide a detailed description and environmental analysis of the WIPP repository and its site. Chapter 14 describes the permits and approvals necessary for the WIPP and the interactions that have taken place with Federal, State, and local authorities, and with the general public in connection with the repository. Chapter 15 analyzes the many comments received on the DEIS and tells what has been done in this FEIS in response. The appendices contain data and discussions in support of the material in the text.

  19. Waste Isolation Pilot Plant Groundwater Protection Management Program Plan

    SciTech Connect

    Washington Regulatory and Environmental Services

    2005-07-01

    The DOE established the Groundwater Monitoring Program (GMP) (WP 02-1) to monitor groundwater resources at WIPP. In the past, the GMP was conducted to establish background data of existing conditions of groundwater quality and quantity in the WIPP vicinity, and to develop and maintain a water quality database as required by regulation. Today the GMP is conducted consistent with 204.1.500 NMAC (New MexicoAdministrative Code), "Adoption of 40 CFR [Code of Federal Regulations] Part 264,"specifically 40 CFR §264.90 through §264.101. These sections of 20.4.1 NMAC provide guidance for detection monitoring of groundwater that is, or could be, affected by waste management activities at WIPP. Detection monitoring at WIPP is designed to detect contaminants in the groundwater long before the general population is exposed. Early detection will allow cleanup efforts to be accomplished before any exposure to the general population can occur. Title 40 CFR Part 264, Subpart F, stipulates minimum requirements of Resource Conservation and Recovery Act of 1976 (42 United States Code [U.S.C.] §6901 et seq.) (RCRA) groundwater monitoring programs including the number and location of monitoring wells; sampling and reporting schedules; analytical methods and accuracy requirements; monitoring parameters; and statistical treatment of monitoring data. This document outlines how WIPP intends to protect and preserve groundwater within the WIPP Land Withdrawal Area (WLWA). Groundwater protection is just one aspect of the WIPP environmental protection effort. An overview of the entire environmental protection effort can be found in DOE/WIPP 99-2194, Waste Isolation Pilot Plant Environmental Monitoring Plan. The WIPP GMP is designed to statistically determine if any changes are occurring in groundwater characteristics within and surrounding the WIPP facility. If a change is noted, the cause will then be determined and the appropriate corrective action(s) initiated.

  20. Waste Isolation Pilot Plant Biennial Environmental Compliance Report

    SciTech Connect

    Washinton TRU Solutions LLC

    2002-09-30

    This Biennial Environmental Compliance Report (BECR) documents environmental regulatory compliance at the Waste Isolation Pilot Plant (WIPP), a facility designed for the safe disposal of transuranic (TRU) radioactive waste, for the reporting period of April 1, 2000, to March 31, 2002. As required by the WIPP Land Withdrawal Act (LWA)(Public Law [Pub. L.] 102-579, as amended by Pub. L. 104-201), the BECR documents U.S. Department of Energy (DOE) Carlsbad Field Office's (CBFO) compliance with applicable environmental protection laws and regulations implemented by agencies of the federal government and the state of New Mexico. In the prior BECR, the CBFO and the management and operating contractor (MOC)committed to discuss resolution of a Letter of Violation that had been issued by the New Mexico Environment Department (NMED) in August 1999, which was during the previous BECR reporting period. This Letter of Violation alleged noncompliance with hazardous waste aisle spacing, labeling, a nd tank requirements. At the time of publication of the prior BECR, resolution of the Letter of Violation was pending. On July 7, 2000, the NMED issued a letter noting that the aisle spacing and labeling concerns had been adequately addressed and that they were rescinding the violation alleging that the Exhaust Shaft Catch Basin failed to comply with the requirements for a hazardous waste tank. During the current reporting period, WIPP received a Notice of Violation and a compliance order alleging the violation of the New Mexico Hazardous Waste Regulations and the WIPP Hazardous Waste Facility Permit (HWFP).

  1. Results of toxicological testing of Jefferson Parish pilot plant samples.

    PubMed Central

    Miller, R G; Kopfler, F C; Condie, L W; Pereira, M A; Meier, J R; Ringhand, H P; Robinson, M; Casto, B C

    1986-01-01

    Five toxicological tests were performed using concentrated drinking water samples collected at a pilot-scale drinking water treatment plant that had streams treated with different disinfectants (no disinfectant, ozone, chlorine dioxide, monochloramine, or chlorine) before treatment with granular activated carbon (GAC). The toxicological tests used in this study were the Ames Salmonella assay, a subchronic in vivo toxicity assay in mice, the SENCAR mouse skin initiation-promotion assay, a rat liver foci assay, and the lung adenoma assay in strain A mice. These tests were conducted to determine the general toxicity and the mutagenic/carcinogenic potential associated with the use of disinfection and/or GAC in the treatment of drinking water. The stability of the mutagenic activity of the samples tested was determined by repeated analysis using the Ames Salmonella assay. Results indicated that the samples remained mutagenic for the duration of the tests. All the drinking water concentrates (4000 X) prepared by the XAD resin adsorption procedure failed to provide statistically significant indication of carcinogenic activity in the SENCAR mouse, rat liver foci, and the lung adenoma assays. However, concentrates of the chlorine, chlorine dioxide, and monochloramine treated waters gave consistent mutagenic responses in the Ames Salmonella assay. GAC was effective for 6 months in removing both the mutagenicity of chlorine-treated water and the potential of water to become mutagenic when treated with chlorine. In the in vivo, subchronic 30-day toxicity test in mice, some statistically significant differences in organ weights and body weights of animals exposed to different concentrates of some of the samples were observed. However, a consistent pattern of these differences indicating overt toxicity was not detected. PMID:3816718

  2. PFLOTRAN Simulation of Waste Isolation Pilot Plant Single Waste Panel

    NASA Astrophysics Data System (ADS)

    Park, H.; Hammond, G. E.

    2015-12-01

    The Waste Isolation Pilot Plant (WIPP), located in southeastern New Mexico, has been developed by the U.S. Department of Energy (DOE) for the deep geologic disposal of transuranic (TRU) waste. WIPP performance assessment (PA) calculations estimate the probability and consequence of potential radionuclide releases from the repository to the accessible environment arising from events and processes that could occur over the 10,000 year regulatory period. The conceptual model estimates three possible cases and the combinations of these cases: 1) undisturbed condition of the repository, 2) human borehole intrusion condition that penetrates the repository, and 3) human borehole intrusion that penetrates pressurized brine underlying the repository. To date, WIPP PA calculations have employed multiple two-dimensional (2D) numerical models requiring simplification of the mesh and processes including homogenization of materials and regions while maintaining volume aspect ratio. Introducing three-dimensional (3D) numerical models within WIPP PA enables increasingly realistic representations of the WIPP subsurface domain and improved flexibility for incorporating relevant features. PFLOTRAN is a state-of-art massively parallel subsurface flow and reactive transport code that will be implemented to enhance PA with more physically realistic 3D flow and transport models; eliminating the need for multiple related, but decoupled 2D models. This paper demonstrates PFLOTRAN simulation of a single waste panel of the WIPP undisturbed condition in 3D. The simulation also employs newly implemented WIPP specific functionalities to PFLOTRAN: 1) gas generation from the wastes, 2) creep closure of bedded salt formation, 3) fractures of marker beds near the excavation, 4) Klinkenberg effect on gas permeability in low-permeable materials, and 5) Redlich-Kwong-Soave equation of state for gas density.

  3. Output-Feedback Model Predictive Control of a Pasteurization Pilot Plant based on an LPV model

    NASA Astrophysics Data System (ADS)

    Karimi Pour, Fatemeh; Ocampo-Martinez, Carlos; Puig, Vicenç

    2017-01-01

    This paper presents a model predictive control (MPC) of a pasteurization pilot plant based on an LPV model. Since not all the states are measured, an observer is also designed, which allows implementing an output-feedback MPC scheme. However, the model of the plant is not completely observable when augmented with the disturbance models. In order to solve this problem, the following strategies are used: (i) the whole system is decoupled into two subsystems, (ii) an inner state-feedback controller is implemented into the MPC control scheme. A real-time example based on the pasteurization pilot plant is simulated as a case study for testing the behavior of the approaches.

  4. NORTH ELEVATION OF HOT PILOT PLANT (CPP640) LOOKING SOUTH AFTER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    NORTH ELEVATION OF HOT PILOT PLANT (CPP-640) LOOKING SOUTH AFTER REMOTE ANALYTICAL FACILITY (CPP-627) WAS REMOVED. PHOTO NUMBER HD-54-33-2. Mike Crane, Photographer, 7/2006 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  5. CONSTRUCTION PROGRESS PHOTO OF HOT PILOT PLANT (CPP640) LOOKING EAST ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CONSTRUCTION PROGRESS PHOTO OF HOT PILOT PLANT (CPP-640) LOOKING EAST SHOWING EXCAVATION AND FORMING; CONSTRUCTION 6 PERCENT COMPLETE. INL PHOTO NUMBER NRTS-59-4935. J. Anderson, Photographer, 9/21/1959 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  6. CONSTRUCTION PROGRESS PHOTO OF HOT PILOT PLANT (CPP640) LOOKING NORTHWEST, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CONSTRUCTION PROGRESS PHOTO OF HOT PILOT PLANT (CPP-640) LOOKING NORTHWEST, SHOWING FORMING FOR NORTH WALLS OF CELLS 1, 4 AND 5; CONSTRUCTION 21 PERCENT COMPLETE. INL PHOTO NUMBER NRTS-60-1874. Holmes, Photographer, 4/21/1960 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  7. Vitrification of plutonium at Rocky Flats the argument for a pilot plant

    SciTech Connect

    Moore, L.

    1996-05-01

    Current plans for stabilizing and storing the plutonium at Rocky Flats Plant fail to put the material in a form suitable for disposition and resistant to proliferation. Vitrification should be considered as an alternate technology. The vitrification should begin with a small-scale pilot plant.

  8. MISCELLANEOUS ARCHITECTURAL DETAILS OF HOT PILOT PLANT (CPP640). INL DRAWING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    MISCELLANEOUS ARCHITECTURAL DETAILS OF HOT PILOT PLANT (CPP-640). INL DRAWING NUMBER 200-640-00-279-111684. ALTERNATE ID NUMBER 8952-CPP-640-A-7. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  9. ARCHITECTURAL FLOOR PLAN OF OPERATING AREA HOT PILOT PLANT (CPP640). ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ARCHITECTURAL FLOOR PLAN OF OPERATING AREA HOT PILOT PLANT (CPP-640). INL DRAWING NUMBER 200-0640-00-279-111678. ALTERNATE ID NUMBER 8952-CPP-640-A-1. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  10. ARCHITECTURAL WALL SECTIONS OF HOT PILOT PLANT (CPP640). INL DRAWING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ARCHITECTURAL WALL SECTIONS OF HOT PILOT PLANT (CPP-640). INL DRAWING NUMBER 200-0640-00-279-111682. ALTERNATE ID NUMBER 8952-CPP-640-A-5. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  11. ARCHITECTURAL DOOR DETAILS AND SCHEDULE OF HOT PILOT PLANT (CPP640). ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ARCHITECTURAL DOOR DETAILS AND SCHEDULE OF HOT PILOT PLANT (CPP-640). INL DRAWING NUMBER 200-640-00-279-111683. ALTERNATE ID NUMBER 8952-CPP-640-A-6. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  12. CONSTRUCTION PROGRESS PHOTO OF HOT PILOT PLANT (CPP640) OVERALL VIEW ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CONSTRUCTION PROGRESS PHOTO OF HOT PILOT PLANT (CPP-640) OVERALL VIEW LOOKING SOUTHEAST; CONSTRUCTION 34 PERCENT COMPLETE. INL PHOTO NUMBER NRTS-60-3034. Holmes, Photographer, 6/23/1960 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  13. CONSTRUCTION PROGRESS PHOTO OF HOT PILOT PLANT (CPP640) LOOKING NORTHEAST ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CONSTRUCTION PROGRESS PHOTO OF HOT PILOT PLANT (CPP-640) LOOKING NORTHEAST SHOWING OVERALL BLOCK EXTERIOR WALLS; CONSTRUCTION 65 PERCENT COMPLETE. INL PHOTO NUMBER NRTS-60-4976. Holmes, Photographer, 9/26/1960 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  14. CONSTRUCTION PROGRESS PHOTO OF HOT PILOT PLANT (CPP640) LOOKING NORTHEAST ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CONSTRUCTION PROGRESS PHOTO OF HOT PILOT PLANT (CPP-640) LOOKING NORTHEAST SHOWING DECK FORMING FOR SOUTH SECTION OF OPERATING CORRIDOR; CONSTRUCTION 44 PERCENT COMPLETE. INL PHOTO NUMBER NRTS-60-3624. Holmes, Photographer, 7/25/1960 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  15. AIR DISPERSION MODELING AT THE WASTE ISOLATION PILOT PLANT

    SciTech Connect

    Rucker, D.F.

    2000-08-01

    One concern at the Waste Isolation Pilot Plant (WIPP) is the amount of alpha-emitting radionuclides or hazardous chemicals that can become airborne at the facility and reach the Exclusive Use Area boundary as the result of a release from the Waste Handling Building (WHB) or from the underground during waste emplacement operations. The WIPP Safety Analysis Report (SAR), WIPP RCRA Permit, and WIPP Emergency Preparedness Hazards Assessments include air dispersion calculations to address this issue. Meteorological conditions at the WIPP facility will dictate direction, speed, and dilution of a contaminant plume of respirable material due to chronic releases or during an accident. Due to the paucity of meteorological information at the WIPP site prior to September 1996, the Department of Energy (DOE) reports had to rely largely on unqualified climatic data from the site and neighboring Carlsbad, which is situated approximately 40 km (26 miles) to the west of the site. This report examines the validity of the DOE air dispersion calculations using new meteorological data measured and collected at the WIPP site since September 1996. The air dispersion calculations in this report include both chronic and acute releases. Chronic release calculations were conducted with the EPA-approved code, CAP88PC and the calculations showed that in order for a violation of 40 CFR61 (NESHAPS) to occur, approximately 15 mCi/yr of 239Pu would have to be released from the exhaust stack or from the WHB. This is an extremely high value. Hence, it is unlikely that NESHAPS would be violated. A site-specific air dispersion coefficient was evaluated for comparison with that used in acute dose calculations. The calculations presented in Section 3.2 and 3.3 show that one could expect a slightly less dispersive plume (larger air dispersion coefficient) given greater confidence in the meteorological data, i.e. 95% worst case meteorological conditions. Calculations show that dispersion will decrease

  16. SCALEUP OF ALUMINUM PHOSPHATE CATALYST FOR PILOT PLANT LPDMEtm RUN

    SciTech Connect

    Andrew W. Wang

    2002-05-15

    The Liquid Phase Dimethyl Ether (LPDME{trademark}) process converts synthesis gas to dimethyl ether in a single slurry bubble column reactor. A mixed slurry of methanol synthesis catalyst and methanol dehydration catalyst in a neutral mineral oil simultaneously synthesizes methanol from syngas and converts some of it to dimethyl ether and water. The reaction scheme is: 2H{sub 2} + CO = CH{sub 3}OH 2CH{sub 3}OH = CH{sub 3}OCH{sub 3} + H{sub 2}O H{sub 2}O + CO = CO{sub 2} + H{sub 2}. Most of the water produced in this reaction is converted to hydrogen by reduction with carbon monoxide (water gas shift reaction). This synergy permits higher per pass conversion than methanol synthesis alone. The enhancement in conversion occurs because dehydration of the methanol circumvents the equilibrium constraint of the syngas-to-methanol step. The slurry bubble column reactor provides the necessary heat transfer capacity to handle the greater heat duty associated with high conversion. In order to improve the stability of the catalyst system, non-stoichiometric aluminum phosphate was proposed as the dehydration catalyst for the LPDME{trademark} process. This aluminum phosphate material is a proprietary catalyst. This catalyst system of a standard methanol catalyst and the aluminum phosphate provided stable process performance that met the program targets under our standard test process conditions in the laboratory. These targets are (1) an initial methanol equivalent productivity of 28 gmol/kg/hr, (2) a CO{sub 2}-free, carbon selectivity of 80% to dimethyl ether and (3) stability of both catalysts equivalent to that of the methanol catalyst in the absence of the aluminum phosphate. A pilot plant trial of the LPDME{trademark} process using the aluminum phosphate catalyst was originally planned for March 1998 at the DOE-owned, Air Products (APCI)-operated facility at LaPorte, Texas. Because the aluminum phosphate catalyst is not commercially available, we initiated a scaleup project

  17. SCALEUP OF ALUMINUM PHOSPHATE CATALYST FOR PILOT PLANT LPDMEtm RUN

    SciTech Connect

    Andrew W. Wang

    2002-01-01

    The Liquid Phase Dimethyl Ether (LPDME{trademark}) process converts synthesis gas to dimethyl ether in a single slurry bubble column reactor. A mixed slurry of methanol synthesis catalyst and methanol dehydration catalyst in a neutral mineral oil simultaneously synthesizes methanol from syngas and converts some of it to dimethyl ether and water. The reaction scheme is shown below: 2H{sub 2} + CO = CH{sub 3}OH; 2CH{sub 3}OH = CH{sub 3}OCH{sub 3} + H{sub 2}O; H{sub 2}O + CO = CO{sub 2} + H{sub 2}. Most of the water produced in this reaction is converted to hydrogen by reduction with carbon monoxide (water gas shift reaction). This synergy permits higher per pass conversion than methanol synthesis alone. The enhancement in conversion occurs because dehydration of the methanol circumvents the equilibrium constraint of the syngas-to-methanol step. The slurry bubble column reactor provides the necessary heat transfer capacity to handle the greater heat duty associated with high conversion. In order to improve the stability of the catalyst system, non-stoichiometric aluminum phosphate was proposed as the dehydration catalyst for the LPDME{trademark} process. This aluminum phosphate material is a proprietary catalyst. This catalyst system of a standard methanol catalyst and the aluminum phosphate provided stable process performance that met the program targets under our standard test process conditions in the laboratory. These targets are (1) an initial methanol equivalent productivity of 28 gmol/kg/hr, (2) a CO{sub 2}-free, carbon selectivity of 80% to dimethyl ether and (3) stability of both catalysts equivalent to that of the methanol catalyst in the absence of the aluminum phosphate. A pilot plant trial of the LPDME{trademark} process using the aluminum phosphate catalyst was originally planned for March 1998 at the DOE-owned, Air Products (APCI)-operated facility at LaPorte, Texas. Because the aluminum phosphate catalyst is not commercially available, we initiated a

  18. Arsenic pilot plant operation and results : Anthony, New Mexico.

    SciTech Connect

    Aragon, Malynda Jo; Everett, Randy L.; Siegel, Malcolm Dean; Aragon, Alicia R.; Kottenstette, Richard Joseph; Holub, William E., Jr.; Wright, Jerome L.; Dwyer, Brian P.

    2007-09-01

    Sandia National Laboratories (SNL) is conducting pilot scale evaluations of the performance and cost of innovative water treatment technologies aimed at meeting the recently revised arsenic maximum contaminant level (MCL) for drinking water. The standard of 10 {micro}g/L (10 ppb) is effective as of January 2006. The pilot tests have been conducted in New Mexico where over 90 sites that exceed the new MCL have been identified by the New Mexico Environment Department. The pilot test described in this report was conducted in Anthony, New Mexico between August 2005 and December 2006 at Desert Sands Mutual Domestic Water Consumers Association (MDWCA) (Desert Sands) Well No.3. The pilot demonstrations are a part of the Arsenic Water Technology Partnership program, a partnership between the American Water Works Association Research Foundation (AwwaRF), SNL and WERC (A Consortium for Environmental Education and Technology Development). The Sandia National Laboratories pilot demonstration at the Desert Sands site obtained arsenic removal performance data for fourteen different adsorptive media under intermittent flow conditions. Well water at Desert Sands has approximately 20 ppb arsenic in the unoxidized (arsenite-As(III)) redox state with moderately high total dissolved solids (TDS), mainly due to high sulfate, chloride, and varying concentrations of iron. The water is slightly alkaline with a pH near 8. The study provides estimates of the capacity (bed volumes until breakthrough at 10 ppb arsenic) of adsorptive media in the same chlorinated water. Adsorptive media were compared side-by-side in ambient pH water with intermittent flow operation. This pilot is broken down into four phases, which occurred sequentially, however the phases overlapped in most cases.

  19. Raft River binary-cycle geothermal pilot power plant final report

    SciTech Connect

    Bliem, C.J.; Walrath, L.F.

    1983-04-01

    The design and performance of a 5-MW(e) binary-cycle pilot power plant that used a moderate-temperature hydrothermal resource, with isobutane as a working fluid, are examined. Operating problems experienced and solutions found are discussed and recommendations are made for improvements to future power plant designs. The plant and individual systems are analyzed for design specification versus actual performance figures.

  20. Operation result of 40kW class MCFC pilot plant

    SciTech Connect

    Saitoh, H.; Hatori, S.; Hosaka, M.; Uematsu, H.

    1996-12-31

    Ishikawajima-Harima Heavy Industries Co., Ltd. developed unique Molten Carbonate Fuel Cell (MCFC) system based on our original concept. To demonstrate the possibility of this system, based on MCFC technology of consigned research from New Energy and Industrial Technology Development Organization (NEDO) in Japan, we designed 40kW class MCFC pilot plant which had all equipments required as a power plant and constructed in our TO-2 Technical Center. This paper presents the test results of the plant.

  1. Sustainable reduction of bioreactor contamination in an industrial fermentation pilot plant.

    PubMed

    Junker, Beth; Lester, Michael; Leporati, James; Schmitt, John; Kovatch, Michael; Borysewicz, Stan; Maciejak, Waldemar; Seeley, Anna; Hesse, Michelle; Connors, Neal; Brix, Thomas; Creveling, Eric; Salmon, Peter

    2006-10-01

    Facility experience primarily in drug-oriented fermentation equipment (producing small molecules such as secondary metabolites, bioconversions, and enzymes) and, to a lesser extent, in biologics-oriented fermentation equipment (producing large molecules such as recombinant proteins and microbial vaccines) in an industrial fermentation pilot plant over the past 15 years is described. Potential approaches for equipment design and maintenance, operational procedures, validation/verification testing, medium selection, culture purity/sterility analysis, and contamination investigation are presented, and those approaches implemented are identified. Failure data collected for pilot plant operation for nearly 15 years are presented and best practices for documentation and tracking are outlined. This analysis does not exhaustively discuss available design, operational and procedural options; rather it selectively presents what has been determined to be beneficial in an industrial pilot plant setting. Literature references have been incorporated to provide background and context where appropriate.

  2. Optimization of limestone sizing for CFB combustors: Results of pilot plant and bench-scale testing

    SciTech Connect

    Alliston, M.; Edvardsson, C.; Wu, S.; Probst, S.

    1994-12-31

    A grant to study the performance of limestones in a Circulating Fluidized Bed Combustor was obtained in 1991 from the Pennsylvania Energy Development Authority (PEDA) by Tampella Power Corporation (TPC). The overall objective of this PEDA project was to carry out a systematic pilot plant tests at TPC`s pilot plant in Williamsport, Pennsylvania, in systematic order to identify ways of improving sulfur capture and limestone utilization through better control of the size distribution and residence time of the limestone particles in the furnace. It was also an objective to determine if bench scale testing could be of value in predicting CFB sorbent behavior. The pilot plant and bench test results were incorporated into an empirical Correlation which accounts for the size distribution and residence time of solids in CFB boiler.

  3. Macroscopic mass and energy balance of a pilot plant anaerobic bioreactor operated under thermophilic conditions.

    PubMed

    Espinosa-Solares, Teodoro; Bombardiere, John; Chatfield, Mark; Domaschko, Max; Easter, Michael; Stafford, David A; Castillo-Angeles, Saul; Castellanos-Hernandez, Nehemias

    2006-01-01

    Intensive poultry production generates over 100,000 t of litter annually in West Virginia and 9 x 10(6) t nationwide. Current available technological alternatives based on thermophilic anaerobic digestion for residuals treatment are diverse. A modification of the typical continuous stirred tank reactor is a promising process being relatively stable and owing to its capability to manage considerable amounts of residuals at low operational cost. A 40-m3 pilot plant digester was used for performance evaluation considering energy input and methane production. Results suggest some changes to the pilot plant configuration are necessary to reduce power consumption although maximizing biodigester performance.

  4. Laboratory Testing of Waste Isolation Pilot Plant Surrogate Waste Materials

    NASA Astrophysics Data System (ADS)

    Broome, S.; Bronowski, D.; Pfeifle, T.; Herrick, C. G.

    2011-12-01

    The Waste Isolation Pilot Plant (WIPP) is a U.S. Department of Energy geological repository for the permanent disposal of defense-related transuranic (TRU) waste. The waste is emplaced in rooms excavated in the bedded Salado salt formation at a depth of 655 m below the ground surface. After emplacement of the waste, the repository will be sealed and decommissioned. WIPP Performance Assessment modeling of the underground material response requires a full and accurate understanding of coupled mechanical, hydrological, and geochemical processes and how they evolve with time. This study was part of a broader test program focused on room closure, specifically the compaction behavior of waste and the constitutive relations to model this behavior. The goal of this study was to develop an improved waste constitutive model. The model parameters are developed based on a well designed set of test data. The constitutive model will then be used to realistically model evolution of the underground and to better understand the impacts on repository performance. The present study results are focused on laboratory testing of surrogate waste materials. The surrogate wastes correspond to a conservative estimate of the degraded containers and TRU waste materials after the 10,000 year regulatory period. Testing consists of hydrostatic, uniaxial, and triaxial tests performed on surrogate waste recipes that were previously developed by Hansen et al. (1997). These recipes can be divided into materials that simulate 50% and 100% degraded waste by weight. The percent degradation indicates the anticipated amount of iron corrosion, as well as the decomposition of cellulosics, plastics, and rubbers. Axial, lateral, and volumetric strain and axial and lateral stress measurements were made. Two unique testing techniques were developed during the course of the experimental program. The first involves the use of dilatometry to measure sample volumetric strain under a hydrostatic condition. Bulk

  5. Pilot plant operation of the Uranium Chip Oxidation Facility at the Y-12 Plant

    SciTech Connect

    Childs, Y.C.

    1987-01-16

    Due to changing environmental regulations, the current practice of depleted uranium chip (machine turning) disposal via shallow land burial has become environmentally objectionable. The chips are pyrophoric and oxidize rapidly when exposed to air; therefore, long-term storage of the uranium chips presents a major fire hazard. The Oak Ridge Y-12 Plant Development Division was contacted to devise a disposal method that would eliminate chip burial and minimize storage space requirements. The proposed method of accomplishing this task was oxidizing the uranium chips to uranium oxide (U/sub 3/O/sub 8/) under controlled conditions. Pilot plant operation of the Uranium Chip Oxidation Facility (UCOF) was initiated on May 20, 1985, by the Y-12 Development Division. The purpose of this initial development testing was to evaluate the equipment, determine operating parameters, and provide on-the-job training for Waste Treatment Operations (WTO) personnel. Startup of the UCOF began with the check-out of the equipment using only the No. 1 oxidizer. Following the verification stage, the oxidizer was loaded with an initial charge of cold uranium oxide (U/sub 3/O/sub 8/) in preparation for test burning. Results of the test are given.

  6. Gridley Ethanol Demonstration Project Utilizing Biomass Gasification Technology: Pilot Plant Gasifier and Syngas Conversion Testing; August 2002 -- June 2004

    SciTech Connect

    Not Available

    2005-02-01

    This report is part of an overall evaluation of using a modified Pearson Pilot Plant for processing rice straw into syngas and ethanol and the application of the Pearson technology for building a Demonstration Plant at Gridley. This report also includes information on the feedstock preparation, feedstock handling, feedstock performance, catalyst performance, ethanol yields and potential problems identified from the pilot scale experiments.

  7. Prospects for pilot plants based on the tokamak, spherical tokamak and stellarator

    NASA Astrophysics Data System (ADS)

    Menard, J. E.; Bromberg, L.; Brown, T.; Burgess, T.; Dix, D.; El-Guebaly, L.; Gerrity, T.; Goldston, R. J.; Hawryluk, R. J.; Kastner, R.; Kessel, C.; Malang, S.; Minervini, J.; Neilson, G. H.; Neumeyer, C. L.; Prager, S.; Sawan, M.; Sheffield, J.; Sternlieb, A.; Waganer, L.; Whyte, D.; Zarnstorff, M.

    2011-10-01

    A potentially attractive next-step towards fusion commercialization is a pilot plant, i.e. a device ultimately capable of small net electricity production in as compact a facility as possible and in a configuration scalable to a full-size power plant. A key capability for a pilot-plant programme is the production of high neutron fluence enabling fusion nuclear science and technology (FNST) research. It is found that for physics and technology assumptions between those assumed for ITER and nth-of-a-kind fusion power plant, it is possible to provide FNST-relevant neutron wall loading in pilot devices. Thus, it may be possible to utilize a single facility to perform FNST research utilizing reactor-relevant plasma, blanket, coil and auxiliary systems and maintenance schemes while also targeting net electricity production. In this paper three configurations for a pilot plant are considered: the advanced tokamak, spherical tokamak and compact stellarator. A range of configuration issues is considered including: radial build and blanket design, magnet systems, maintenance schemes, tritium consumption and self-sufficiency, physics scenarios and a brief assessment of research needs for the configurations.

  8. Arsenic pilot plant operation and results:Weatherford, Oklahoma.

    SciTech Connect

    Aragon, Malynda Jo; Arora, H. (Narasimhan Consulting Services Inc., Phoenix, Arizona); Karori, Saqib (Narasimhan Consulting Services Inc., Phoenix, Arizona); Pathan, Sakib

    2007-05-01

    Narasimhan Consulting Services, Inc. (NCS), under a contract with the Sandia National Laboratories (SNL), designed and operated pilot scale evaluations of the adsorption and coagulation/filtration treatment technologies aimed at meeting the recently revised arsenic maximum contaminant level (MCL) for drinking water. The standard of 10 {micro}g/L (10 ppb) is effective as of January 2006. The pilot demonstration is a project of the Arsenic Water Technology Partnership program, a partnership between the American Water Works Association Research Foundation (AwwaRF), SNL and WERC (A Consortium for Environmental Education and Technology Development). The pilot evaluation was conducted at Well 30 of the City of Weatherford, OK, which supplies drinking water to a population of more than 10,400. Well water contained arsenic in the range of 16 to 29 ppb during the study. Four commercially available adsorption media were evaluated side by side for a period of three months. Both adsorption and coagulation/filtration effectively reduced arsenic from Well No.30. A preliminary economic analysis indicated that adsorption using an iron oxide media was more cost effective than the coagulation/ filtration technology.

  9. Central receiver solar thermal power system, Phase 1: CDRL Item 2, pilot plant preliminary design report. Volume VII. Pilot plant cost and commercial plant cost and performance

    SciTech Connect

    Hallet, Jr., R. W.; Gervais, R. L.

    1980-05-01

    Detailed cost and performance data for the proposed tower focus pilot plant and commercial plant are given. The baseline central receiver concept defined by the MDAC team consists of the following features: (A) an external receiver mounted on a tower, and located in a 360/sup 0/ array of sun-tracking heliostats which comprise the collector subsystem. (B) feedwater from the electrical power generation subsystem is pumped through a riser to the receiver, where the feedwater is converted to superheated steam in a single pass through the tubes of the receiver panels. (C) The steam from the receiver is routed through a downcomer to the ground and introduced to a turbine directly for expansion and generation of electricity, and/or to a thermal storage subsystem, where the steam is condensed in charging heat exchangers to heat a dual-medium oil and rock thermal storage unit (TSU). (D) Extended operation after daylight hours is facilitated by discharging the TSU to generate steam for feeding the admission port of the turbine. (E) Overall control of the system is provided by a master control unit, which handles the interactions between subsystems that take place during startup, shutdown, and transitions between operating modes. (WHK)

  10. The design of future central receiver power plants based on lessons learned from the Solar One Pilot Plant

    SciTech Connect

    Kolb, G.J.

    1991-01-01

    The 10-MW{sub e} Solar One Pilot Plant was the world's largest solar central receiver power plant. During its power production years it delivered over 37,000 MWhrs (net) to the utility grid. In this type of electric power generating plant, large sun-tracking mirrors called heliostats reflect and concentrate sunlight onto a receiver mounted on top a of a tower. The receiver transforms the solar energy into thermal energy that heats water, turning it into superheated steam that drives a turbine to generate electricity. The Solar One Pilot Plant successfully demonstrated the feasibility of generating electricity with a solar central receiver power plant. During the initial 2 years the plant was tested and 4 years the plant was operated as a power plant, a great deal of data was collected relating to the efficiency and reliability of the plant's various systems. This paper summarizes these statistics and compares them to goals developed by the US Department of Energy. Based on this comparison, improvements in the design and operation of future central receiver plants are recommended. Research at Sandia National Laboratories and the US utility industry suggests that the next generation of central receiver power plants will use a molten salt heat transfer fluid rather than water/steam. Sandia has recently completed the development of the hardware needed in a molten salt power plant. Use of this new technology is expected to solve many of the performance problems encountered at Solar One. Projections for the energy costs from these future central receiver plants are also presented. For reference, these projections are compared to the current energy costs from the SEGS parabolic trough plants now operating in Southern California.

  11. The design of future central receiver power plants based on lessons learned from the Solar One Pilot Plant

    NASA Astrophysics Data System (ADS)

    Kolb, G. J.

    The 10-MW(sub e) Solar One Pilot Plant was the world's largest solar central receiver power plant. During its power production years it delivered over 37,000 MWhrs (net) to the utility grid. In this type of electric power generating plant, large sun-tracking mirrors called heliostats reflect and concentrate sunlight onto a receiver mounted on top of a tower. The receiver transforms the solar energy into thermal energy that heats water, turning it into superheated steam that drives a turbine to generate electricity. The Solar One Pilot Plant successfully demonstrated the feasibility of generating electricity with a solar central receiver power plant. During the initial 2 years the plant was tested and 4 years the plant was operated as a power plant, a great deal of data was collected relating to the efficiency and reliability of the plant's various systems. This paper summarizes these statistics and compares them to goals developed by the U.S. Department of Energy. Based on this comparison, improvements in the design and operation of future central receiver plants are recommended. Research at Sandia National Laboratories and the U.S. utility industry suggests that the next generation of central receiver power plants will use a molten salt heat transfer fluid rather than water/steam. Sandia has recently completed the development of the hardware needed in a molten salt power plant. Use of this new technology is expected to solve many of the performance problems encountered at Solar One. Projections for the energy costs from these future central receiver plants are also presented. For reference, these projections are compared to the current energy costs from the SEGS parabolic trough plants now operating in Southern California.

  12. Use of a Modern Polymerization Pilot-Plant for Undergraduate Control Projects.

    ERIC Educational Resources Information Center

    Mendoza-Bustos, S. A.; And Others

    1991-01-01

    Described is a project where students gain experience in handling large volumes of hazardous materials, process start up and shut down, equipment failures, operational variations, scaling up, equipment cleaning, and run-time scheduling while working in a modern pilot plant. Included are the system design, experimental procedures, and results. (KR)

  13. A&M. TAN607. Process experimental pilot plant (PREPP) in north machine ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    A&M. TAN-607. Process experimental pilot plant (PREPP) in north machine shop of TAN-607. First floor plan shows kiln area, internal room dividers, air locks, and other features integrated within TAN-607. Ralph M. Parsons A-2. Date: February 1984. INEEL index no. 034-0607-00-693-147021 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  14. Waste Isolation Pilot Plant Transuranic Waste Baseline inventory report. Volume 2. Revision 1

    SciTech Connect

    1995-02-01

    This document is the Baseline Inventory Report for the transuranic (alpha-bearing) wastes stored at the Waste Isolation Pilot Plant (WIPP) in New Mexico. Waste stream profiles including origin, applicable EPA codes, typical isotopic composition, typical waste densities, and typical rates of waste generation for each facility are presented for wastes stored at the WIPP.

  15. Pasteurization of strawberry puree using a pilot plant pulsed electric fields (PEF) system

    Technology Transfer Automated Retrieval System (TEKTRAN)

    The processing of strawberry puree by pulsed electric fields (PEF) in a pilot plant system has never been evaluated. In addition, a method does not exist to validate the exact number and shape of the pulses applied during PEF processing. Both buffered peptone water (BPW) and fresh strawberry puree (...

  16. Hydraulic testing of Salado Formation evaporites at the Waste Isolation Pilot Plant site: Second interpretive report

    SciTech Connect

    Beauheim, R.L.; Roberts, R.M.; Dale, T.F.; Fort, M.D.; Stensrud, W.A.

    1993-12-01

    Pressure-pulse, constant-pressure flow, and pressure-buildup tests have been performed in bedded evaporites of the Salado Formation at the Waste Isolation Pilot Plant (WIPP) site to evaluate the hydraulic properties controlling brine flow through the Salado. Transmissivities have been interpreted from six sequences of tests conducted on five stratigraphic intervals within 15 m of the WIPP underground excavations.

  17. 78 FR 34380 - Biennial Determination of the Waste Isolation Pilot Plant's Compliance With Applicable Federal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-07

    ... Environmental Laws for the Period 2010 to 2012 AGENCY: Environmental Protection Agency (EPA). ACTION: Notice... From the Federal Register Online via the Government Publishing Office ] ENVIRONMENTAL PROTECTION... Pilot Plant (WIPP), the U.S. Environmental Protection Agency (EPA or ``we'') determined that,...

  18. 76 FR 31611 - Biennial Determination of the Waste Isolation Pilot Plant's Compliance with Applicable Federal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-01

    ... Environmental Laws for the Period 2008 to 2010 AGENCY: Environmental Protection Agency (EPA). ACTION: Notice... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION... Pilot Plant (WIPP), the U.S. Environmental Protection Agency (EPA or ``we'') determined that,...

  19. Chemistry research and development. Progress report, December 1978-May 1979. [Component, pilot plant, instrumentation

    SciTech Connect

    Miner, F. J.

    1980-06-30

    Progress and activities are reported on component development, pilot plant development, and instrumentation and statistical systems. Specific items studied include processing of pond sludge, transport of radioactive materials and wastes, corrosion, decontamination and cleaning, fluidized-bed incineration, Pu contamination of soils, chemical analysis, radiometric analysis, security. (DLC)

  20. Not-from-concentrate pilot plant ‘Wonderful’ cultivar pomegranate juice changes: Volatiles

    Technology Transfer Automated Retrieval System (TEKTRAN)

    Pilot plant ultrafiltration was used to mimic the dominant U.S. commercial pomegranate juice extraction method (hydraulic pressing whole fruit), to deliver a not-from-concentrate (NFC) juice that was high-temperature short-time pasteurized and stored at 4 and 25 °C. Recovered were 46 compounds, of ...

  1. FATE OF SEX HORMONES IN TWO PILOT-SCALE MUNICIPAL WASTEWATER TREATMENT PLANTS: CONVENTIONAL TREATMENT

    EPA Science Inventory

    The fate of seven sex hormones (estrone (E1), estradiol (E2), estriol (E3), ethinylestradiol (EE2), testosterone, androstenedione, and progesterone) was determined in two pilot-scale wastewater treatment plants operated under conventional loading conditions. The levels of hormon...

  2. Waste Isolation Pilot Plant Geotechnical Analysis Report for July 2005 - June 2006, Volume 2, Supporting Data

    SciTech Connect

    Washington TRU Solutions LLC

    2007-03-25

    This report is a compilation of geotechnical data presented as plots for each active instrument installed in the underground at the Waste Isolation Pilot Plant (WIPP) through June 30, 2006. A summary of the geotechnical analyses that were performed using the enclosed data is provided in Volume 1 of the Geotechnical Analysis Report (GAR).

  3. CONSTRUCTION PROGRESS PHOTO OF HOT PILOT PLANT (CP640) LOOKING NORTHWEST ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CONSTRUCTION PROGRESS PHOTO OF HOT PILOT PLANT (CP-640) LOOKING NORTHWEST SHOWING FORMING AND PLACEMENT OF REINFORCING STEEL FOR SOUTH WALLS OF CELLS 1, 3, 4 AND 5 AND WEST WALL FOR CELLS 1 AND 2; CONSTRUCTION 13 PERCENT COMPLETE. INL PHOTO NUMBER NRTS 59-6436. J. Anderson, Photographer, 12/18/1959 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  4. Risk Based Inspection Pilot Study of Ignalina Nuclear Power Plant,Unit 2

    SciTech Connect

    Brickstad, Bjorn; Letzter, Adam; Klimasauskas, Arturas; Alzbutas, Robertas; Nedzinskas, Linas; Kopustinskas, Vytis

    2002-07-01

    A project with the acronym IRBIS (Ignalina Risk Based Inspection pilot Study) has been performed with the objective to perform a quantitative risk analysis of a total of 1240 stainless steel welds in Ignalina Nuclear Power Plant, unit 2 (INPP-2). The damage mechanism is IGSCC and the failure probabilities are quantified by using probabilistic fracture mechanics. The conditional core damage probabilities are taken from the plant PSA. (authors)

  5. Pilot-plant technical assessment of wet flue gas desulfurization using limestone

    SciTech Connect

    Ortiz, F.J.G.; Vidal, F.; Ollero, P.; Salvador, L.; Cortes, V.; Gimenez, A.

    2006-02-15

    An experimental study was performed on a countercurrent pilot-scale packed scrubber for wet flue gas desulfurization (FGD). The flow rate of the treated flue gas was around 300 Nm{sup 3}/h, so the pilot-plant capacity is one of the largest with respect to other published studies on a pilot-plant wet FGD. The tests were carried out at an SO{sub 2} inlet concentration of 2000 ppm by changing the recycle slurry pH to around 4.8 and the L/G ratio to between 7.5 and 15. Three types of limestone were tested, obtaining desulfurization efficiencies from 59 to 99%. We show the importance of choosing an appropriate limestone in order to get a better performance from the FGD plant. Thus, it is important to know the reactivity (on a laboratory scale) and the sorbent utilization (on a pilot-plant scale) in order to identify if a limestone is reactive enough and to compare it with another type. In addition, by using the transfer-unit concept, a function has been obtained for the desulfurization efficiency, using the L/G ratio and the recycle slurry pH as independent variables. The Ca/S molar ratio is related to these and to the SO{sub 2} removal efficiency. This function, together with a simplified function of the operation variable cost, allows us to determine the pair (L/G ratio and pH) to achieve the desired SO{sub 2} removal with the minimum operation cost. Finally, the variable operation costs between packed towers and spray scrubbers have been compared, using as a basis the pilot packed tower and the industrial spray column at the Compostilla Power Station's FGD plant (in Leon, Spain).

  6. JPL - Small Power Systems Applications Project. [for solar thermal power plant development and commercialization

    NASA Technical Reports Server (NTRS)

    Ferber, R. R.; Marriott, A. T.; Truscello, V.

    1978-01-01

    The Small Power Systems Applications (SPSA) Project has been established to develop and commercialize small solar thermal power plants. The technologies of interest include all distributed and central receiver technologies which are potentially economically viable in power plant sizes of one to 10 MWe. The paper presents an overview of the SPSA Project and briefly discusses electric utility involvement in the Project.

  7. Virtual pilot plants: What is the goal and what technology development is needed?

    SciTech Connect

    Bryden, K.M.; O'Brien, T.J.

    2000-07-01

    Within the coal utilization industry, moving virtual reality from a visualization tool to a design tool has the potential to reduce design time and cost, improve plant design and operation, and reduce the risk associated with new technologies. The goal of developing this technology is to enable an engineering design team based in disparate geographical locations to interact simultaneously with the virtual pilot plant and to see immediately the effect on performance of their design changes. In order to promote this capability, the US Department of Energy has identified virtual demonstrations as one of the key supporting technologies needed for the development of Vision 21 plants. This will require that many computational intensive technologies be enhanced and closely integrated: computer aided design/engineering (CAD/CAE), computational fluid dynamics (CFD), finite element analysis, intelligent process control, systems analysis, information management, and advanced visualization. Virtual pilot plants will create a design environment that will be a low-cost alternative to a physical pilot plant, allowing changes in plant operation and design to be rapidly and inexpensively tested. Following construction, the virtual environment will be used as the front-end of a total information system containing all of the design, construction, operation, research scale, pilot scale, and economic information available on the system. The information will be intuitively accessible by going to the place of interest in the virtual plant and entering the dimension of interest. The goal of the virtual demonstration will be to provide easily accessible information at any level of detail to anyone who needs it from policy maker to operating engineer.

  8. Pilot plant test of the advanced flash stripper for CO2 capture.

    PubMed

    Lin, Yu-Jeng; Chen, Eric; Rochelle, Gary T

    2016-10-20

    Alternative stripping processes have been proposed to reduce energy use for CO2 capture, but only a few have been applied to pilot-scale experiments. This paper presents the first pilot plant test results of one of the most promising stripper configurations, the advanced flash stripper with cold and warm rich solvent bypass. The campaign using aqueous piperazine was carried out at UT Austin in 2015. The advanced flash stripper improves the heat duty by over 25% compared to previous campaigns using the two-stage flash, achieving 2.1 GJ per tonne CO2 of heat duty and 32 kJ mol(-1) CO2 of total equivalent work. The bypass control strategy proposed minimized the heat duty. The test successfully demonstrated the remarkable energy performance and the operability of this advanced system. An Aspen Plus® model was validated using the pilot plant data and used to explore optimum operating and design conditions. The irreversibility analysis showed that the pilot plant performance has attained 50% thermodynamic efficiency and further energy improvement should focus on the absorber and the cross exchanger by increasing absorption rate and solvent capacity.

  9. Recovery of glass from the inert fraction refused by MBT plants in a pilot plant.

    PubMed

    Dias, Nilmara; Garrinhas, Inés; Maximo, Angela; Belo, Nuno; Roque, Paulo; Carvalho, M Teresa

    2015-12-01

    Selective collection is a common practice in many countries. However, even in some of those countries there are recyclable materials, like packaging glass, erroneously deposited in the Mixed Municipal Solid Waste (MMSW). In the present paper, a solution is proposed to recover glass from the inert reject of Mechanical and Biological Treatment (MBT) plants treating MMSW aiming at its recycling. The inert reject of MBT (MBTr) plants is characterized by its small particle size and high heterogeneity. The study was made with three real samples of diverse characteristics superimposed mainly by the different upstream MBT. One of the samples (VN) had a high content in organics (approximately 50%) and a particle size smaller than 16 mm. The other two were coarser and exhibited similar particle size distribution but one (RE) was rich in glass (almost 70%) while the other (SD) contained about 40% in glass. A flowsheet was developed integrating drying, to eliminate moisture related with organic matter contamination; magnetic separation, to separate remaining small ferrous particles; vacuum suction, to eliminate light materials; screening, to eliminate the finer fraction that has a insignificant content in glass, and to classify the >6mm fraction in 6-16 mm and >16 mm fractions to be processed separately; separation by particle shape, in the RecGlass equipment specifically designed to eliminate stones; and optical sorting, to eliminate opaque materials. A pilot plant was built and the tests were conducted with the three samples separately. With all samples, it was possible to attain approximately 99% content in glass in the glass products, but the recovery of glass was related with the feed particle size. The finer the feed was, the lower the percentage of glass recovered in the glass product. The results show that each one of the separation processes was needed for product enrichment. The organic matter recovered in the glass product was high, ranging from 0.76% to 1

  10. Distillation of granulated scrap tires in a pilot plant.

    PubMed

    López, Félix A; Centeno, Teresa A; Alguacil, Francisco José; Lobato, Belén

    2011-06-15

    This paper reports the pyrolytic treatment of granulated scrap tires (GST) in a pilot distillation unit at moderate temperature (550°C) and atmospheric pressure, to produce oil, char and gas products. Tire-derived oil is a complex mixture of organic C(5)-C(24) compounds, including a very large proportion of aromatic compounds. This oil has a high gross calorific value (∼ 43 MJ kg(-1)) and N and S contents of 0.4% and 0.6%, respectively, falling within the specifications of certain heating fuels. The distillation gas is composed of hydrocarbons; methane and n-butane are the most abundant, investing the distillation gas with a very high gross calorific value (∼ 68 MJ Nm(-3)). This gas is transformed into electric power by a co-generation turbine. The distillation char is mostly made of carbon but with significant inorganic impurities (∼ 12 wt%). The quality of the solid residue of the process is comparable to that of some commercial chars. The quantity of residual solids, and the qualities of the gas, liquid and solid fractions, are similar to those obtained by conventional pyrolytic treatments of waste tires. However, the simplicity of the proposed technology and its low investment costs make it a very attractive alternative.

  11. EVALUATION OF FGD DRY INJECTION SORBENTS AND ADDITIVES - VOLUME 2 - PILOT PLANT EVALUATION OF HIGH REACTIVITY SORBENTS

    EPA Science Inventory

    The report describes a mini-pilot test program to investigate potential new sorbents and processes for dry SO2 removal. Initial tests showed that the 85 cu m/h pilot plant could be used successfully to evaluate both spray dryer and dry injection processes using traditional calciu...

  12. The advanced PFB process: Pilot plant results and design studies

    SciTech Connect

    Robertson, A.; Domeracki, W.; Horazak, D.; Rehmat, A.

    1993-11-01

    The plant being developed is a hybrid of two technologies; it incorporates the partial gasification of coal in a vessel called the carbonizer and the combustion of the resultant char residue in a circulating pressurized fluidized bed combustor (CPFBC). In this plant, coal is fed to a pressurized carbonizer that produces a low-Btu fuel gas and char. After passing through a cyclone and a ceramic barrier filter to remove gas-entrained particulates, the fuel gas is burned in a topping combustor to produce the energy required to drive a gas turbine. The gas turbine drives a generator and a compressor that feeds air to the carbonizer, a CPFBC, and a fluidized bed heat exchanger (FBHE). The carbonizer char is burned in the CPFBC with high excess air. The vitiated air from the CPFBC supports combustion of the fuel gas in the gas turbine topping combustor. Steam generated in a heat-recovery steam generator (HRSG) downstream of the gas turbine and in the FBHE associated with the CPFBC drives the steam turbine generator that furnishes the balance of electric power delivered by the plant. The low-Btu gas is produced in the carbonizer by pyrolysis/mild devolatilization of coal in a fluidized bed reactor. Because this unit operates at temperatures much lower than gasifiers currently under development, it also produces a char residue. Left untreated, the fuel gas will contain hydrogen sulfide and sulfur-containing tar/light oil vapors; therefore, lime-based sorbents are injected into the carbonizer to catalytically enhance tar cracking and to capture sulfur as calcium sulfide. Sulfur is captured in situ, and the raw fuel gas is fired hot. Thus the expensive, complex, fuel gas heat exchangers and the chemical or sulfur-capturing bed cleanup systems that are part of the coal gasification combined-cycle plants now being developed are eliminated.

  13. Socioeconomic study for the proposed waste isolation pilot plant

    SciTech Connect

    Not Available

    1980-10-01

    This document presents the historical and existing socioeconomic conditions in the vicinity of the proposed plant, projected changes in those conditions with and without the plant, and an outline of the various techniques used to make these projections. The analysis predicts impacts on the general economy in the area near the plant and on employment, personal income, population, social structure, the private economic sector, housing, land use, community services and facilities, and local government finances. Among the most important results are the following predictions: The economy of the area will derive $165 million directly and indirectly during the first 7.5 years of the project. After that, it will derive about $21 million directly and indirectly during each year of full operation. About 2100 jobs will be created directly and indirectly at the peak of the construction and about 950 jobs during the full operation. A net in-migration will occur: about 2250 people at the peak of the construction and about 1000 people during operation. A housing shortage may begin in Carlsbad in 1981 or 1982 and last for about 2 years.

  14. Separation of packaging plastics by froth flotation in a continuous pilot plant

    SciTech Connect

    Carvalho, Teresa; Durao, Fernando; Ferreira, Celia

    2010-11-15

    The objective of the research was to apply froth flotation to separate post-consumer PET (Polyethylene Terephthalate) from other packaging plastics with similar density, in a continuously operated pilot plant. A representative sample composed of 85% PET, 2.5% PVC (Polyvinyl Chloride) and 11.9% PS (Polystyrene) was subjected to a combination of alkaline treatment and surfactant adsorption followed by froth flotation. A mineral processing pilot plant, owned by a Portuguese mining company, was adapted for this purpose. The experimentation showed that it is possible to produce an almost pure concentrate of PET, containing 83% of the PET in feed, in a single bank of mechanical flotation cells. The concentrate grade attained was 97.2% PET, 1.1% PVC and 1.1% PS. By simulation it was shown that the Portuguese recycling industry specifications can be attained if one cleaning and one scavenger stages are added to the circuit.

  15. Portable pilot plant for evaluating marine biofouling growth and control in heat exchangers-condensers.

    PubMed

    Casanueva, J F; Sánchez, J; García-Morales, J L; Casanueva-Robles, T; López, J A; Portela, J R; Nebot, E; Sales, D

    2003-01-01

    Biofouling frequently involves a serious impediment to achieving optimum operating conditions in heat exchangers-condensers. The economic coat and energy losses associated with this phenomenon are significant and the environmental impact of biocides must satisfy stringent regulations. A portable pilot plant has been designed in order to carry out in-situ experimental study as biofilm is formed under thermal and hydrodynamically controlled conditions. The pilot plant has an automatic monitoring, control and data acquisition system, which automatically processes data from indirect measure of fouling in terms of increased fluid frictional and heat transfer resistances. A particular method is used and proposed for direct measuring and biofilm characterization. Once we know the actual film thickness, we can calculate the effective thermal conductivity of the layer by using the appropriate heat transfer equations.

  16. Waste Isolation Pilot Plant Site Environmental Report for calendar year 1989

    SciTech Connect

    Not Available

    1989-01-01

    This is the 1989 Site Environmental Report (SER) for the Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico. The WIPP is a government owned and contractor-operated facility. The WIPP project is operated by Westinghouse Electric Corporation for the US Department of Energy (DOE). The mission of the WIPP is to provide a research and development facility to demonstrate the safe disposal of transuranic (TRU) waste generated by the defense activities of the US Government. This report provides a comprehensive description of environmental activities at the WIPP during calendar year 1989. The WIPP facility will not receive waste until all concerns affecting opening the WIPP are addressed to the satisfaction of the Secretary of Energy. Therefore, this report describes the status of the preoperational activities of the Radiological Environmental Surveillance (RES) program, which are outlined in the Radiological Baseline Program for the Waste Isolation Pilot Plant (WTSD-TME-057). 72 refs., 13 figs., 20 tabs.

  17. Separation of packaging plastics by froth flotation in a continuous pilot plant.

    PubMed

    Carvalho, Teresa; Durão, Fernando; Ferreira, Célia

    2010-11-01

    The objective of the research was to apply froth flotation to separate post-consumer PET (Polyethylene Terephthalate) from other packaging plastics with similar density, in a continuously operated pilot plant. A representative sample composed of 85% PET, 2.5% PVC (Polyvinyl Chloride) and 11.9% PS (Polystyrene) was subjected to a combination of alkaline treatment and surfactant adsorption followed by froth flotation. A mineral processing pilot plant, owned by a Portuguese mining company, was adapted for this purpose. The experimentation showed that it is possible to produce an almost pure concentrate of PET, containing 83% of the PET in feed, in a single bank of mechanical flotation cells. The concentrate grade attained was 97.2% PET, 1.1% PVC and 1.1% PS. By simulation it was shown that the Portuguese recycling industry specifications can be attained if one cleaning and one scavenger stages are added to the circuit.

  18. Data used in preliminary performance assessment of the Waste Isolation Pilot Plant (1990)

    SciTech Connect

    Rechard, R.P ); Luzzolino, H. ); Sandha, J.S. )

    1990-12-01

    This report documents the data available as of August 1990 and used by the Performance Assessment Division of Sandia National Laboratories in its December 1990 preliminary performance assessment of the Waste Isolation Pilot Plant (WIPP). Parameter values are presented in table form for the geologic subsystem, engineered barriers, borehole flow properties, climate variability, and intrusion characteristics. Sources for the data and a brief discussion of each parameter are provided. 101 refs., 72 figs., 21 tabs.

  19. Manufacturing demonstration of microbially mediated zinc sulfide nanoparticles in pilot-plant scale reactors.

    PubMed

    Moon, Ji-Won; Phelps, Tommy J; Fitzgerald, Curtis L; Lind, Randall F; Elkins, James G; Jang, Gyoung Gug; Joshi, Pooran C; Kidder, Michelle; Armstrong, Beth L; Watkins, Thomas R; Ivanov, Ilia N; Graham, David E

    2016-09-01

    The thermophilic anaerobic metal-reducing bacterium Thermoanaerobacter sp. X513 efficiently produces zinc sulfide (ZnS) nanoparticles (NPs) in laboratory-scale (≤ 24-L) reactors. To determine whether this process can be up-scaled and adapted for pilot-plant production while maintaining NP yield and quality, a series of pilot-plant scale experiments were performed using 100-L and 900-L reactors. Pasteurization and N2-sparging replaced autoclaving and boiling for deoxygenating media in the transition from small-scale to pilot plant reactors. Consecutive 100-L batches using new or recycled media produced ZnS NPs with highly reproducible ~2-nm average crystallite size (ACS) and yields of ~0.5 g L(-1), similar to the small-scale batches. The 900-L pilot plant reactor produced ~320 g ZnS without process optimization or replacement of used medium; this quantity would be sufficient to form a ZnS thin film with ~120 nm thickness over 0.5 m width × 13 km length. At all scales, the bacteria produced significant amounts of acetic, lactic, and formic acids, which could be neutralized by the controlled addition of sodium hydroxide without the use of an organic pH buffer, eliminating 98 % of the buffer chemical costs. The final NP products were characterized using XRD, ICP-OES, TEM, FTIR, PL, DLS, HPLC, and C/N analyses, which confirmed that the growth medium without organic buffer enhanced the ZnS NP properties by reducing carbon and nitrogen surface coatings and supporting better dispersivity with similar ACS.

  20. Bio-isolation analysis of plants and humans in a piloted Mars sprint

    NASA Technical Reports Server (NTRS)

    Novara, M.; Cullingford, H. S.

    1988-01-01

    The bioisolation dynamics of humans and plants in a piloted Mars sprint is discussed. The bioisolation requirements for a crew of six and two food crops, lettuce, and winged beans in this type of space mission were studied and found to be within technological reach. It was found that the garbage problem of the shorter missions increases in magnitude in proportion with the mission duration and poses problems of launch mass, storage space availability, and microbial growth.

  1. Removal of actinides from nuclear reprocessing wastes: a pilot plant study using non-radioactive simulants

    SciTech Connect

    Maxey, H.R.; McIsaac, L.D.; Chamberlain, D.B.; McManus, G.J.

    1980-01-01

    Nuclear fuel reprocessing wastes generated at the ICPP contain small amounts of actinides, primarily Pu and Am. Removal of these actinides reduces the long term storage hazards of the waste. The development of a flowsheet to remove trivalent actinides is discussed in this paper. Pilot plant studies used actinide simulants. As a result of these studies, the Height of a Transfer Unit (HTU) was selected as the better measure of pulse column separation efficiency.

  2. Core analyses for selected samples from the Culebra Dolomite at the Waste Isolation Pilot Plant site

    SciTech Connect

    Kelley, V.A.; Saulnier, G.J. Jr. )

    1990-11-01

    Two groups of core samples from the Culebra Dolomite Member of the Rustler Formation at and near the Waste Isolation Pilot Plant were analyzed to provide estimates of hydrologic parameters for use in flow-and-transport modeling. Whole-core and core-plug samples were analyzed by helium porosimetry, resaturation and porosimetry, mercury-intrusion porosimetry, electrical-resistivity techniques, and gas-permeability methods. 33 refs., 25 figs., 10 tabs.

  3. Final report on the power production phase of the 10 MW/sub e/ Solar Thermal Central Receiver Pilot Plant

    SciTech Connect

    Radosevich, L.G.

    1988-03-01

    This report describes the evaluations of the power production testing of Solar One, the 10 MW/sub e/ Solar Thermal Central Receiver Pilot Plant near Barstow, California. The Pilot Plant, a cooperative project of the US Department of Energy and utility firms led by the Southern California Edison Company, began a three year period of power production operation in August 1984. During this period, plant performance indicators, such as capacity factor, system efficiency, and availability, were studied to assess the operational capability of the Pilot Plant to reliably supply electrical power. Also studied was the long-term performance of such key plant components as the heliostats and the receiver. During the three years of power production, the Pilot Plant showed an improvement in performance. Considerable increases in capacity factor, system efficiency, and availability were achieved. Heliostat operation was reliable, and only small amounts of mirror corrosion were observed. Receiver tube leaks did occur, however, and were the main cause of the plant's unscheduled outages. The Pilot Plant provided valuable lessons which will aid in the design of future solar central receiver plants. 53 refs., 46 figs., 4 tabs.

  4. Tung FDG Test Facility. Phase 2, Pilot plant demonstration. Final report

    SciTech Connect

    1995-06-01

    The Tung FGD Process is a regenerative process which extracts SO{sub 2} from a scrubbing liquor into an organic medium using mixer-settlers followed by steam-stripping the SO{sub 2} off from the organic medium. For the process to operate satisfactorily, (1) the organic must be stable, (2) phase separation must be relatively fast, (3) crud (i.e. solids in-between two phases) must not form and (4) SO{sub 2} must be able to be stripped off from the organic medium readily. The demonstration confirmed that the first three conditions can be met satisfactorily. Much lower stripping efficiency was attained in the pilot plant demonstration than what was previously attained in a bench-scale demonstration. Engineering analysis showed that the pilot plant stripping column was scaled up from the bench-scale column incorrectly. A new scale-up criterion for stripping a relatively viscous liquid medium is proposed based upon pilot plant data.

  5. Hydrometallurgical recovery of germanium from coal gasification fly ash: pilot plant scale evaluation

    SciTech Connect

    Arroyo, F.; Fernandez-Pereira, C.; Olivares, J.; Coca, P.

    2009-04-15

    In this article, a hydrometallurgical method for the selective recovery of germanium from fly ash (FA) has been tested at pilot plant scale. The pilot plant flowsheet comprised a first stage of water leaching of FA, and a subsequent selective recovery of the germanium from the leachate by solvent extraction method. The solvent extraction method was based on Ge complexation with catechol in an aqueous solution followed by the extraction of the Ge-catechol complex (Ge(C{sub 6}H{sub 4}O{sub 2}){sub 3}{sup 2-}) with an extracting organic reagent (trioctylamine) diluted in an organic solvent (kerosene), followed by the subsequent stripping of the organic extract. The process has been tested on a FA generated in an integrated gasification with combined cycle (IGCC) process. The paper describes the designed 5 kg/h pilot plant and the tests performed on it. Under the operational conditions tested, approximately 50% of germanium could be recovered from FA after a water extraction at room temperature. Regarding the solvent extraction method, the best operational conditions for obtaining a concentrated germanium-bearing solution practically free of impurities were as follows: extraction time equal to 20 min; aqueous phase/organic phase volumetric ratio equal to 5; stripping with 1 M NaOH, stripping time equal to 30 min, and stripping phase/organic phase volumetric ratio equal to 5. 95% of germanium were recovered from water leachates using those conditions.

  6. [Yield of starch extraction from plantain (Musa paradisiaca). Pilot plant study].

    PubMed

    Flores-Gorosquera, Emigdia; García-Suárez, Francisco J; Flores-Huicochea, Emmanuel; Núñez-Santiago, María C; González-Soto, Rosalia A; Bello-Pérez, Luis A

    2004-01-01

    In México, the banana (Musa paradisiaca) is cooked (boiling or deep frying) before being eaten, but the consumption is not very popular and a big quantity of the product is lost after harvesting. The unripe plantain has a high level of starch and due to this the use of banana can be diversified as raw material for starch isolation. The objective of this work was to study the starch yield at pilot plant scale. Experiments at laboratory scale were carried out using the pulp with citric acid to 0,3 % (antioxidant), in order to evaluate the different unitary operations of the process. The starch yield, based on starch presence in the pulp that can be isolated, were between 76 and 86 %, and the values at pilot plant scale were between 63 and 71 %, in different lots of banana fruit. Starch yield values were similar among the diverse lots, showing that the process is reproducible. The lower values of starch recovery at pilot plant scale are due to the loss during sieving operations; however, the amount of starch recovery is good.

  7. Baseline designs of moored and grazing 40-MW OTEC pilot plants. Volume B. Engineering drawings

    SciTech Connect

    Not Available

    1980-06-01

    This is one part of a two-volume report that presents baseline design data for two types of floating Ocean Thermal Energy Conversion (OTEC) pilot plants: (a) a moored plant that uses underwater cables to transmit electric power to a shore-based utility company, and (b) a cruising plantship that uses the OTEC electric power to produce an energy-intensive product onboard, where it is stored for later transshipment to market. This volume provides the engineering drawings of the hull, cold-water pipe, ship outfitting and machinery, OTEC power system, electrical system, and folded-tube heat exchangers.

  8. Baseline designs of moored and grazing 40-MW OTEC pilot plants. Volume B: Engineering drawings

    NASA Astrophysics Data System (ADS)

    1980-06-01

    Baseline design data are presented for two types of floating Ocean Thermal Energy Conversion (OTEC) pilot plants: (1) a moored plant that uses underwater cables to transmit electric power to a shore-based utility company, and (2) a cruising plantship that uses the OTEC electric power to produce an energy-intensive product onboard, where it is stored for later transshipment to market. Engineering drawings of the hull, cold-water pipe, ship outfitting and machinery, OTEC power system, electrical system, and folded-tube heat exchangers are provided.

  9. Impact of physics and technology innovations on compact tokamak fusion pilot plants

    NASA Astrophysics Data System (ADS)

    Menard, Jonathan

    2016-10-01

    For magnetic fusion to be economically attractive and have near-term impact on the world energy scene it is important to focus on key physics and technology innovations that could enable net electricity production at reduced size and cost. The tokamak is presently closest to achieving the fusion conditions necessary for net electricity at acceptable device size, although sustaining high-performance scenarios free of disruptions remains a significant challenge for the tokamak approach. Previous pilot plant studies have shown that electricity gain is proportional to the product of the fusion gain, blanket thermal conversion efficiency, and auxiliary heating wall-plug efficiency. In this work, the impact of several innovations is assessed with respect to maximizing fusion gain. At fixed bootstrap current fraction, fusion gain varies approximately as the square of the confinement multiplier, normalized beta, and major radius, and varies as the toroidal field and elongation both to the third power. For example, REBCO high-temperature superconductors (HTS) offer the potential to operate at much higher toroidal field than present fusion magnets, but HTS cables are also beginning to access winding pack current densities up to an order of magnitude higher than present technology, and smaller HTS TF magnet sizes make low-aspect-ratio HTS tokamaks potentially attractive by leveraging naturally higher normalized beta and elongation. Further, advances in kinetic stabilization and feedback control of resistive wall modes could also enable significant increases in normalized beta and fusion gain. Significant reductions in pilot plant size will also likely require increased plasma energy confinement, and control of turbulence and/or low edge recycling (for example using lithium walls) would have major impact on fusion gain. Reduced device size could also exacerbate divertor heat loads, and the impact of novel divertor solutions on pilot plant configurations is addressed. For

  10. Pilot plant testing of IGT`s two-stage fluidized-bed/cyclonic agglomerating combustor

    SciTech Connect

    Rehmat, A.; Mensinger, M.C.; Richardson, T.L.

    1993-12-31

    The Institute of Gas Technology (IGT) is conducting a multi-year experimental program to develop and test, through pilot-scale operation, IGT`s two-stage fluidized-bed/cyclonic agglomerating combustor (AGGCOM). The AGGCOM process is based on combining the fluidized-bed agglomeration and gasification technology with the cyclonic combustion technology, both of which have been developed at IGT over many years. AGGCOM is a unique and extremely flexible combustor that can operate over a wide range of conditions in the fluidized-bed first stage from low temperature (desorption) to high temperature (agglomeration), including gasification of high-energy-content wastes. The ACCCOM combustor can easily and efficiently destroy solid, liquid, and gaseous organic wastes, while isolating solid inorganic contaminants within an essentially non-leachable glassy matrix, suitable for disposal in ordinary landfills. Fines elutriated from the first stage are captured by a high-efficiency cyclone and returned to the fluidized bed for ultimate incorporation into the agglomerates. Intense mixing in the second-stage cyclonic combustor ensures high destruction and removal efficiencies (DRE) for organic compounds that may be present in the feed material. This paper presents an overview of the experimental development of the AGGCOM process and progress made to date in designing, constructing, and operating the 6-ton/day AGGCOM pilot plant. Results of the bench-scale tests conducted to determine the operating conditions necessary to agglomerate a soil were presented at the 1991 Incineration Conference. On-site construction of the AGGCOM pilot plant was initiated in August 1992 and completed at the end of March 1993, with shakedown testing following immediately thereafter. The initial tests in the AGGCOM pilot plant will focus on the integrated operation of both stages of the combustor and will be conducted with ``clean`` topsoil.

  11. Surface water and wastewater treatment using a new tannin-based coagulant. Pilot plant trials.

    PubMed

    Sánchez-Martín, J; Beltrán-Heredia, J; Solera-Hernández, C

    2010-10-01

    A new tannin-based coagulant-flocculant (Tanfloc) was tested for water treatment at a pilot plant level. Four types of water sample were treated: surface water (collected from a river), and municipal, textile industry (simulated by a 100 mg L(-1) aqueous solution of an acid dye), and laundry (simulated by a 50 mg L(-1) aqueous solution of an anionic surfactant) wastewaters. The pilot plant process consisted of coagulation, sedimentation, and filtration. The experiments were carried out with an average coagulant dosage of 92.2 mg L(-1) (except in the case of the surface water for which the dosage was 2 mg L(-1)). The efficacy of the water purification was notable in every case: total turbidity removal in the surface water and municipal wastewater, about 95% dye removal in the case of the textile industry wastewater, and about 80% surfactant removal in the laundry wastewater. Filtration improved the removal of suspended solids, both flocs and turbidity, and slightly improved the process as a whole. The efficiency of Tanfloc in these pilot studies was similar to or even better than that obtained in batch trials.

  12. Reduction of sediment micro-pollution by means of a pilot plant.

    PubMed

    Petavy, F; Ruban, V; Conil, P; Viau, J Y

    2008-01-01

    Solutions need to be found to manage polluted (organic matter, trace elements, hydrocarbons and PAHs) stormwater sediments while complying with stringent economic and environmental requirements. The cost of transport is a relatively large part of the treatment cost for such sediments, hence the development of a pilot unit that could provide their in situ treatment. Seven stormwater sediments were treated by means of the ATTRISED pilot plant, based on sieving and attrition. The objective is to apply a treatment procedure by which as much clean material as possible is recovered, while the pollutants are concentrated in a small volume ready for final destruction or isolation from the environment. Application of the attrition process serves to remove fine particles and contaminants from the surface of sediments and hydrocyclone separations allow to isolate fine contaminated particles (< 60 microm). The results show that particle size separations coupled to an attrition step allow decontamination efficiencies of 76% and 70% for street sweeping and pond sediments, respectively. Although the experiments were carried out on stormwater sediments, all kinds of sediments may be treated by the ATTRISED pilot plant if the mean particle size is greater than 60 microm.

  13. Pilot testing of a membrane system for postcombustion CO2 capture

    SciTech Connect

    Merkel, Tim; Kniep, Jay; Wei, Xiaotong; Carlisle, Trevor; White, Steve; Pande, Saurabh; Fulton, Don; Watson, Robert; Hoffman, Thomas; Freeman, Brice; Baker, Richard

    2015-09-30

    This final report summarizes work conducted for the U.S. Department of Energy, National Energy Technology Laboratory (DOE) to scale up an efficient post-combustion CO2 capture membrane process to the small pilot test stage (award number DE-FE0005795). The primary goal of this research program was to design, fabricate, and operate a membrane CO2 capture system to treat coal-derived flue gas containing 20 tonnes CO2/day (20 TPD). Membrane Technology and Research (MTR) conducted this project in collaboration with Babcock and Wilcox (B&W), the Electric Power Research Institute (EPRI), WorleyParsons (WP), the Illinois Sustainable Technology Center (ISTC), Enerkem (EK), and the National Carbon Capture Center (NCCC). In addition to the small pilot design, build and slipstream testing at NCCC, other project efforts included laboratory membrane and module development at MTR, validation field testing on a 1 TPD membrane system at NCCC, boiler modeling and testing at B&W, a techno-economic analysis (TEA) by EPRI/WP, a case study of the membrane technology applied to a ~20 MWe power plant by ISTC, and an industrial CO2 capture test at an Enerkem waste-to-biofuel facility. The 20 TPD small pilot membrane system built in this project successfully completed over 1,000 hours of operation treating flue gas at NCCC. The Polaris™ membranes used on this system demonstrated stable performance, and when combined with over 10,000 hours of operation at NCCC on a 1 TPD system, the risk associated with uncertainty in the durability of postcombustion capture membranes has been greatly reduced. Moreover, next-generation Polaris membranes with higher performance and lower cost were validation tested on the 1 TPD system. The 20 TPD system also demonstrated successful operation of a new low-pressure-drop sweep module that will reduce parasitic energy losses at full scale by as much as 10 MWe. In modeling and pilot boiler testing, B&W confirmed the

  14. Model predictive control of a wet limestone flue gas desulfurization pilot plant

    SciTech Connect

    Perales, A.L.V.; Ollero, P.; Ortiz, F.J.G.; Gomez-Barea, A.

    2009-06-15

    A model predictive control (MPC) strategy based on a dynamic matrix (DMC) is designed and applied to a wet limestone flue gas desulfurization (WLFGD) pilot plant to evaluate what enhancement in control performance can be achieved with respect to a conventional decentralized feedback control strategy. The results reveal that MPC can significantly improve both reference tracking and disturbance rejection. For disturbance rejection, the main control objective in WLFGD plants, selection of tuning parameters and sample time, is of paramount importance due to the fast effect of the main disturbance (inlet SO{sub 2} load to the absorber) on the most important controlled variable (outlet flue gas SO{sub 2} concentration). The proposed MPC strategy can be easily applied to full-scale WLFGD plants.

  15. Experimental investigation and modeling of a wet flue gas desulfurization pilot plant

    SciTech Connect

    Kiil, S.; Michelsen, M.L.; Dam-Johansen, K.

    1998-07-01

    A detailed model for a wet flue gas desulfurization (FGD) pilot plant, based on the packed tower concept, has been developed. All important rate-determining steps, absorption of SO{sub 2}, oxidation of HSO{sub 3}{sup {minus}}, dissolution of limestone, and crystallization of gypsum were included. Population balance equations, governing the description of particle size distributions of limestone in the plant, were derived. Model predictions were compared to experimental data such as gas-phase concentration profiles of SO{sub 2}, slurry pH profiles, solids content of the slurry, liquid-phase concentrations, and residual limestone in the gypsum. Simulations were found to match experimental data for the two limestone types investigated. A parameter study of the model was conducted with the purpose of validating assumptions and extracting information on wet FGD systems. The modeling tools developed may be applicable to other wet FGD plants.

  16. 300-FF-1 Operable Unit physical separation of soils pilot plant study

    SciTech Connect

    Freeman-Pollard, J.R.

    1994-01-15

    Alternative Remedial Technologies, Inc. (ART) was selected in a competitive selection process to conduct a pilot study for the physical separation of soils in the North Process Pond of the 300 Area at the Hanford Site. In January 1994, ART mobilized its 15 tons-per-hour pilot plant to the site. The plant was initially staged in a commercial area to allow for pretest inspections and minor modifications. The plant was specifically designed for use as a physical separations unit and consisted of a feed hopper, wet screens, hydrocyclones, as well as settling and dewatering equipment. The plant was supported in the field with prescreening equipment, mobile generators, air compressors, and water storage tanks. The plant was moved into the surface contamination area on March 24, 1994. The testing was conducted during the period March 23, 1994 through April 13, 1994. Two soil types were treated during the testing: a natural soil contaminated with low levels of uranium, cesium, cobalt, and heavy metals, and a natural soil contaminated with a uranium carbonate material that was visually recognizable by the presence of a green sludge material in the soil matrix. The ``green`` material contained significantly higher levels of the same contaminants. Both source materials were treated by the plant in a manner that fed the material, produced clean gravel and sand fractions, and concentrated the contaminants in a sludge cake. Process water was recycled during the operations. The testing was extremely successful in that for both source waste streams, it was demonstrated that volume reductions of greater than 90% could be achieved while also meeting the test performance criteria. The volume reduction for the natural soils averaged a 93.8%, while the ``green`` soils showed a 91.4% volume reduction.

  17. Production of Jet Fuels from Coal Derived Liquids. Volume 9. Results of Bench-Scale and Pilot Plant Testing

    DTIC Science & Technology

    1989-06-01

    Amoco Oil Company has conducted bench- and pilot plant-scale experiments to produce jet fuels from the tar oil from the Great Plains Coal ... Gasification Plant in Beulah, North Dakota. Experiments show that the hydroprocessing conditions recommended in Task I are not severe enough to saturate the

  18. The effects of regional insolation differences upon advanced solar thermal electric power plant performance and energy costs

    NASA Technical Reports Server (NTRS)

    Latta, A. F.; Bowyer, J. M.; Fujita, T.; Richter, P. H.

    1979-01-01

    The performance and cost of the 10 MWe advanced solar thermal electric power plants sited in various regions of the continental United States were determined. The regional insolation data base is discussed. A range for the forecast cost of conventional electricity by region and nationally over the next several cades are presented.

  19. Adsorption and removal at low atrazine concentration in an MBR pilot plant.

    PubMed

    Buttiglieri, G; Migliorisi, L; Malpei, F

    2011-01-01

    Atrazine is a persistent organic pollutant and it has been widely used in agriculture and forestry in the world for more than fifty years. Atrazine shows ecotoxicity effects in aquatic ecosystems even at very low level concentrations with endocrine disruptor activity. Few studies were carried out on atrazine removal performances in drinking and waste-water by biological treatments, especially in membrane bio-reactors (MBRs). MBR technology might be more efficient than the conventional one in the removal of micro-pollutants. The fate of atrazine in wastewater treatment plants and its influence on the biomass activity was evaluated in this study. The experimental work was divided in three different phases: inhibition studies on different types of biomass (by means of microcalorimetry); adsorption studies on different sludges (conventional activated sludge (CAS) - and MBR) calculating adsorption isotherms and, finally, atrazine removal in an MBR pilot plant (simulating a treatment of atrazine and nitrate contaminated groundwater). The absence of significant inhibition was observed; higher atrazine adsorption on MBR sludge was detected for lower atrazine concentration (<50 µg L(-1)); the removal efficiency in the MBR pilot plant was lower than 25% but higher than the theoretical one (based on adsorption isotherms).

  20. A pilot plant for removing chromium from residual water of tanneries.

    PubMed Central

    Landgrave, J

    1995-01-01

    The purpose of this study is to develop a technical process for removing trivalent chromium from tannery wastewater via precipitation. This process can be considered an alternative that avoids a remediation procedure against the metal presence in industrial wastes. This process was verified in a treatment pilot plant located in León, México handling 10 m3/day of three types of effluents. The effluent streams were separated to facilitate the elimination of pollutants from each one. The process was based on in situ treatment and recycle to reduce problems associated with transportation and confinement of contaminated sludges. Two types of treatment were carried out in the pilot plant: The physical/chemical and biological treatments. Thirty-five experiments were conducted and the studied variables were the pH, type of flocculant, and its dose. The statistical significance of chromium samples was 94.7% for its precipitation and 99.7% for recovery. The objectives established for this phase of the development were accomplished and the overall efficiencies were measured for each stage in the pilot plant. The results were: a) chromium precipitation 99.5% from wastewater stream, b) chromium recovery 99% for recycling, and c) physical/chemical treatment to eliminate grease and fat at least 85% and 65 to 70% for the biological treatment. The tanning of a hide lot (350 pieces) was accomplished using 60% treated and recycled water without affecting the product quality. The recovered chromium liquor was also used in this hide tanning. This technical procedure is also applicable for removing heavy metals in other industrial sectors as well as in reducing water consumption rates, if pertinent adjustments are implemented. PMID:7621802

  1. Manufacturing demonstration of microbially mediated zinc sulfide nanoparticles in pilot-plant scale reactors

    SciTech Connect

    Moon, Ji-Won; Phelps, Tommy J.; Fitzgerald Jr, Curtis L.; Lind, Randall F.; Elkins, James G.; Jang, Gyoung Gug; Joshi, Pooran C.; Kidder, Michelle; Armstrong, Beth L.; Watkins, Thomas R.; Ivanov, Ilia N.; Graham, David E.

    2016-04-27

    The thermophilic anaerobic metal-reducing bacterium Thermoanaerobacter sp. X513 efficiently produces zinc sulfide (ZnS) nanoparticles (NPs) in laboratory-scale ( ≤24-L) reactors. To determine whether this process can be up-scaled and adapted for pilot-plant production while maintaining NP yield and quality, a series of meso-scale experiments were performed using 100-l and 900-l reactors. Pasteurization and N2-sparging replaced autoclaving and boiling for deoxygenating media in the transition from small-scale to pilot-plant reactors. Consecutive 100-L batches using new or recycled media produced ZnS NPs with highly reproducible ~2 nm average crystallite size (ACS) and yields of ~0.5g L-1, similar to small-scale batches. The 900-L pilot plant reactor produced ~ 320 g ZnS without process optimization or replacement of used medium; this quantity would be sufficient to form a ZnS thin film with ~120 nm thickness over 0.5 m width 13 km length. At all scales, the bacteria produced significant amounts of acetic, lactic and formic acids, which could be neutralized by the controlled addition of sodium hydroxide without the use of an organic pH buffer, eliminating 98% of the buffer chemical costs. In conclusion, the final NP products were characterized using XRD, ICP-OES, FTIR, DLS, and C/N analyses, which confirmed the growth medium without organic buffer enhanced the ZnS NP properties by reducing carbon and nitrogen surface coatings and supporting better dispersivity with similar ACS.

  2. Manufacturing demonstration of microbially mediated zinc sulfide nanoparticles in pilot-plant scale reactors

    DOE PAGES

    Moon, Ji-Won; Phelps, Tommy J.; Fitzgerald Jr, Curtis L.; ...

    2016-04-27

    The thermophilic anaerobic metal-reducing bacterium Thermoanaerobacter sp. X513 efficiently produces zinc sulfide (ZnS) nanoparticles (NPs) in laboratory-scale ( ≤24-L) reactors. To determine whether this process can be up-scaled and adapted for pilot-plant production while maintaining NP yield and quality, a series of meso-scale experiments were performed using 100-l and 900-l reactors. Pasteurization and N2-sparging replaced autoclaving and boiling for deoxygenating media in the transition from small-scale to pilot-plant reactors. Consecutive 100-L batches using new or recycled media produced ZnS NPs with highly reproducible ~2 nm average crystallite size (ACS) and yields of ~0.5g L-1, similar to small-scale batches. The 900-Lmore » pilot plant reactor produced ~ 320 g ZnS without process optimization or replacement of used medium; this quantity would be sufficient to form a ZnS thin film with ~120 nm thickness over 0.5 m width 13 km length. At all scales, the bacteria produced significant amounts of acetic, lactic and formic acids, which could be neutralized by the controlled addition of sodium hydroxide without the use of an organic pH buffer, eliminating 98% of the buffer chemical costs. In conclusion, the final NP products were characterized using XRD, ICP-OES, FTIR, DLS, and C/N analyses, which confirmed the growth medium without organic buffer enhanced the ZnS NP properties by reducing carbon and nitrogen surface coatings and supporting better dispersivity with similar ACS.« less

  3. Photocatalytic degradation of oil industry hydrocarbons models at laboratory and at pilot-plant scale

    SciTech Connect

    Vargas, Ronald; Nunez, Oswaldo

    2010-02-15

    Photodegradation/mineralization (TiO{sub 2}/UV Light) of the hydrocarbons: p-nitrophenol (PNP), naphthalene (NP) and dibenzothiophene (DBT) at three different reactors: batch bench reactor (BBR), tubular bench reactor (TBR) and tubular pilot-plant (TPP) were kinetically monitored at pH = 3, 6 and 10, and the results compared using normalized UV light exposition times. The results fit the Langmuir-Hinshelwood (LH) model; therefore, LH adsorption equilibrium constants (K) and apparent rate constants (k) are reported as well as the apparent pseudo-first-order rate constants, k{sub obs}{sup '} = kK/(1 + Kc{sub r}). The batch bench reactor is the most selective reactor toward compound and pH changes in which the reactivity order is: NP > DBT > PNP, however, the catalyst adsorption (K) order is: DBT > NP > PNP at the three pH used but NP has the highest k values. The tubular pilot-plant (TPP) is the most efficient of the three reactors tested. Compound and pH photodegradation/mineralization selectivity is partially lost at the pilot plant where DBT and NP reaches ca. 90% mineralization at the pH used, meanwhile, PNP reaches only 40%. The real time, in which these mineralization occur are: 180 min for PNP and 60 min for NP and DBT. The mineralization results at the TPP indicate that for the three compounds, the rate limiting step is the same as the degradation one. So that, there is not any stable intermediate that may accumulate during the photocatalytic treatment. (author)

  4. Direct Air Capture of CO2 - an Overview of Carbon Engineering's Technology and Pilot Plant Development

    NASA Astrophysics Data System (ADS)

    Holmes, G.; Corless, A.

    2014-12-01

    At Carbon Engineering, we are developing and commercializing technology to scrub CO2 directly from atmospheric air at industrial scale. By providing atmospheric CO2 for use in fuel production, we can enable production of transportation fuels with ultra-low carbon intensities, which command price premiums in the growing set of constrained fuels markets such as California's LCFS. We are a Calgary based startup founded in 2009 with 10 employees, and we are considered a global leader in the direct air capture (DAC) field. We will review CE's DAC technology, based on a wet-scrubbing "air contactor" which absorbs CO2 into aqueous solution, and a chemical looping "regeneration" component, which liberates pure CO2 from this aqueous solution while re-making the original absorption chemical. CE's DAC tecnology exports purified atmospheric CO2, combined with the combustion CO2 from plant energy usage, as the end product. We will also discuss CE's 2014-2015 end-to-end Pilot Demonstration Unit. This is a $7M technology demonstration plant that CE is building with the help of key industrial partners and equipment vendors. Vendor design and engineering requirements have been used to specify the pilot air contactor, pellet reactor, calciner, and slaker modules, as well as auxiliary systems. These modules will be run for several months to obtain the engineering and performance data needed for subsequent commercial plant design, as well as to test the residual integration risks associated with CE's process. By the time of the AGU conference, the pilot is expected to be in late stages of fabrication or early stages of site installation.

  5. Reconsolidation of salt as applied to permanent seals for the Waste Isolation Pilot Plant

    SciTech Connect

    Hansen, F.D.; Callahan, G.D.; Van Sembeek, L.L.

    1993-07-01

    Reconsolidated salt is a fundamental component of the permanent seals for the Waste Isolation Pilot Plant. As regulations are currently understood and seal concepts envisioned, emplaced salt is the sole long-term seal component designed to prevent the shafts from becoming preferred pathways for rating gases or liquids. Studies under way in support of the sealing function of emplaced salt include laboratory testing of crushed salt small-scale in situ tests, constitutive modeling of crushed salt, calculations of the opening responses during operation and closure, and design practicalities including emplacement techniques. This paper briefly summarizes aspects of these efforts and key areas of future work.

  6. Waste acceptance criteria for the Waste Isolation Pilot Plant. Revision 4

    SciTech Connect

    Not Available

    1991-12-01

    This Revision 4 of the Waste Acceptance Criteria (WAC), WIPP-DOE-069, identifies and consolidates existing criteria and requirements which regulate the safe handling and preparation of Transuranic (TRU) waste packages for transportation to and emplacement in the Waste Isolation Pilot Plant (WIPP). This consolidation does not invalidate any existing certification of TRU waste to the WIPP Operations and Safety Criteria (Revision 3 of WIPP-DOE--069) and/or Transportation: Waste Package Requirements (TRUPACT-II Safety Analysis Report for Packaging [SARP]). Those documents being consolidated, including Revision 3 of the WAC, currently support the Test Phase.

  7. Position paper on gas generation in the Waste Isolation Pilot Plant

    SciTech Connect

    Brush, L.H.

    1994-11-15

    Gas generation by transuranic (TRU) waste is a significant issue because gas will, if produced in significant quantities, affect the performance of the Waste Isolation Pilot Plant (WIPP) with respect to Environmental Protection Agency (EPA) regulations for the long-term isolation of radioactive and chemically hazardous waste. If significant gas production occurs, it will also affect, and will be affected by, other processes and parameters in WIPP disposal rooms. The processes that will produce gas in WIPP disposal rooms are corrosion, microbial activity and radiolysis. This position paper describes these processes and the models, assumptions and data used to predict gas generation in WIPP disposal rooms.

  8. From science to compliance: Geomechanics studies of the Waste Isolation Pilot Plant

    SciTech Connect

    HANSEN,FRANCIS D.

    2000-06-05

    Mechanical and hydrological properties of salt provide excellent bases for geological isolation of hazardous materials. Regulatory certification of the Waste Isolation Pilot Plant (WIPP) testifies to the nearly ideal characteristics of bedded salt deposits in southeast New Mexico. The WIPP history includes decades of testing and scientific investigations, which have resulted in a comprehensive understanding of salt's mechanical deformational and hydrological properties over an applicable range of stresses and temperatures. Comprehensive evaluation of salt's favorable characteristics helped demonstrate regulatory compliance and ensure isolation of radioactive waste placed in a salt geological setting.

  9. Waste Isolation Pilot Plant Annual Site Environmental Report for 2014. Emended

    SciTech Connect

    none,

    2015-09-01

    The purpose of the Waste Isolation Pilot Plant (WIPP) Annual Site Environmental Report for 2014 (ASER) is to provide information required by U.S. Department of Energy (DOE) Order 231.1B, Environment, Safety, and Health Reporting. Specifically, the ASER presents summary environmental data to: Characterize site environmental management performance; Summarize environmental occurrences and responses reported during the calendar year (CY); Confirm compliance with environmental standards and requirements; Highlight significant environmental accomplishments, including progress toward the DOE environmental sustainability goals made through implementation of the WIPP Environmental Management System (EMS).

  10. Temperature Profile Measurements in a Newly Constructed 30-Stage 5 cm Centrifugal Contactor pilot Plant

    SciTech Connect

    Troy G. Garn; Dave H. Meikrantz; Mitchell R. Greenhalgh; Jack D. Law

    2008-09-01

    An annular centrifugal contactor pilot plant incorporating 30 stages of commercial 5 cm CINC V-02 units has been built and operated at INL during the past year. The pilot plant includes an automated process control and data acquisitioning system. The primary purpose of the pilot plant is to evaluate the performance of a large number of inter-connected centrifugal contactors and obtain temperature profile measurements within a 30-stage cascade. Additional solvent extraction flowsheet testing using stable surrogates is also being considered. Preliminary hydraulic testing was conducted with all 30 contactors interconnected for continuous counter-current flow. Hydraulic performance and system operational tests were conducted successfully but with higher single-stage rotor speeds found necessary to maintain steady interstage flow at flowrates of 1 L/min and higher. Initial temperature profile measurements were also completed in this configuration studying the performance during single aqueous and two-phase counter-current flow at ambient and elevated inlet solution temperatures. Temperature profile testing of two discreet sections of the cascade required additional feed and discharge connections. Lamp oil, a commercially available alkane mixture of C14 to C18 chains, and tap water adjusted to pH 2 were the solution feeds for all the testing described in this report. Numerous temperature profiles were completed using a newly constructed 30-stage centrifugal contactor pilot plant. The automated process control and data acquisition system worked very well throughout testing. Temperature data profiles for an array of total flowrates (FT) and contactor rpm values for both single-phase and two-phase systems have been collected with selected profiles and comparisons reported. Total flowrates (FT) ranged from 0.5-1.4 L/min with rotor speeds from 3500-4000 rpm. Solution inlet temperatures ranging from ambient up to 50° C were tested. Ambient temperature testing shows that a

  11. Complete study of the pyrolysis and gasification of scrap tires in a pilot plant reactor.

    PubMed

    Conesa, Juan A; Martín-Gullón, I; Font, R; Jauhiainen, J

    2004-06-01

    The pyrolysis and gasification of tires was studied in a pilot plant reactor provided with a system for condensation of semivolatile matter. The study comprises experiments at 450, 750, and 1000 degrees C both in nitrogen and 10% oxygen atmospheres. Analysis of all the products obtained (gases, liquids, char, and soot) are presented. In the gas phase only methane and benzene yields increase with temperature until 1000 degrees C. In the liquids the main components are styrene, limonene, and isoprene. The solid fraction (including soot) increases with temperature. Zinc content of the char decreases with increasing temperature.

  12. Perspective of the Science Advisor to the Waste Isolation Pilot Plant

    SciTech Connect

    WEART,WENDELL D.

    1999-09-03

    In 1975 Sandia National Laboratories (SNL) was asked by the predecessor to the Department of Energy to assume responsibility for the scientific programs necessary to assure the safe and satisfactory development of a geologic repository in the salt beds of southeast New Mexico. Sandia has continued in the role of Science Advisor to the Waste Isolation Pilot Plant (WIPP) to the present time. This paper will share the perspectives developed over the past 25 years as the project was brought to fruition with successful certification by the Environmental Protection Agency (EPA) on May 13, 1998 and commencement of operations on April 26, 1999.

  13. Improvement of the ethanol productivity in a high gravity brewing at pilot plant scale.

    PubMed

    Dragone, Giuliano; Silva, Daniel P; de Almeida e Silva, João Batista; de Almeida Lima, Urgel

    2003-07-01

    A 23 full factorial design was used to study the influence of different experimental variables, namely wort gravity, fermentation temperature and nutrient supplementation, on ethanol productivity from high gravity wort fermentation by Saccharomyces cerevisiae (lager strain), under pilot plant conditions. The highest ethanol productivity (0.69 g l(-1) h(-1)) was obtained at 20 degrees P [degrees P is the weight of extract (sugar) equivalent to the weight of sucrose in a 100 g solution at 20 degrees C], 15 degrees C, with the addition of 0.8% (w/v) yeast extract, 24 mg l(-1) ergosterol and 0.24% (v/v) Tween 80.

  14. A pilot study of mercury liberation and capture from coal-fired power plant fly ash.

    PubMed

    Li, Jin; Gao, Xiaobing; Goeckner, Bryna; Kollakowsky, Dave; Ramme, Bruce

    2005-03-01

    The coal-fired electric utility generation industry has been identified as the largest anthropogenic source of mercury (Hg) emissions in the United States. One of the promising techniques for Hg removal from flue gas is activated carbon injection (ACI). The aim of this project was to liberate Hg bound to fly ash and activated carbon after ACI and provide high-quality coal combustion products for use in construction materials. Both bench- and pilot-scale tests were conducted to liberate Hg using a thermal desorption process. The results indicated that up to 90% of the Hg could be liberated from the fly ash or fly-ash-and-activated-carbon mixture using a pilot-scale apparatus (air slide) at 538 degrees C with a very short retention time (less than 1 min). Scanning electron microscope (SEM) evaluation indicated no significant change in fly ash carbon particle morphology following the thermal treatment. Fly ash particles collected in the baghouse of the pilot-scale apparatus were smaller in size than those collected at the exit of the air slide. A similar trend was observed in carbon particles separated from the fly ash using froth flotation. The results of this study suggest a means for power plants to reduce the level of Hg in coal-combustion products and potentially recycle activated carbon while maintaining the resale value of fly ash. This technology is in the process of being patented.

  15. Operating boundaries of full-scale advanced water reuse treatment plants: many lessons learned from pilot plant experience.

    PubMed

    Bele, C; Kumar, Y; Walker, T; Poussade, Y; Zavlanos, V

    2010-01-01

    Three Advanced Water Treatment Plants (AWTP) have recently been built in South East Queensland as part of the Western Corridor Recycled Water Project (WCRWP) producing Purified Recycled Water from secondary treated waste water for the purpose of indirect potable reuse. At Luggage Point, a demonstration plant was primarily operated by the design team for design verification. The investigation program was then extended so that the operating team could investigate possible process optimisation, and operation flexibility. Extending the demonstration plant investigation program enabled monitoring of the long term performance of the microfiltration and reverse osmosis membranes, which did not appear to foul even after more than a year of operation. The investigation primarily identified several ways to optimise the process. It highlighted areas of risk for treated water quality, such as total nitrogen. Ample and rapid swings of salinity from 850 to 3,000 mg/l-TDS were predicted to affect the RO process day-to-day operation and monitoring. Most of the setpoints used for monitoring under HACCP were determined during the pilot plant trials.

  16. Select Generic Dry-Storage Pilot Plant Design for Safeguards and Security by Design (SSBD) per Used Fuel Campaign

    SciTech Connect

    Demuth, Scott Francis; Sprinkle, James K.

    2015-05-26

    As preparation to the year-end deliverable (Provide SSBD Best Practices for Generic Dry-Storage Pilot Scale Plant) for the Work Package (FT-15LA040501–Safeguards and Security by Design for Extended Dry Storage), the initial step was to select a generic dry-storage pilot plant design for SSBD. To be consistent with other DOE-NE Fuel Cycle Research and Development (FCR&D) activities, the Used Fuel Campaign was engaged for the selection of a design for this deliverable. For the work Package FT-15LA040501–“Safeguards and Security by Design for Extended Dry Storage”, SSBD will be initiated for the Generic Dry-Storage Pilot Scale Plant described by the layout of Reference 2. SSBD will consider aspects of the design that are impacted by domestic material control and accounting (MC&A), domestic security, and international safeguards.

  17. Biodiesel production from vegetable oil and waste animal fats in a pilot plant.

    PubMed

    Alptekin, Ertan; Canakci, Mustafa; Sanli, Huseyin

    2014-11-01

    In this study, corn oil as vegetable oil, chicken fat and fleshing oil as animal fats were used to produce methyl ester in a biodiesel pilot plant. The FFA level of the corn oil was below 1% while those of animal fats were too high to produce biodiesel via base catalyst. Therefore, it was needed to perform pretreatment reaction for the animal fats. For this aim, sulfuric acid was used as catalyst and methanol was used as alcohol in the pretreatment reactions. After reducing the FFA level of the animal fats to less than 1%, the transesterification reaction was completed with alkaline catalyst. Due to low FFA content of corn oil, it was directly subjected to transesterification. Potassium hydroxide was used as catalyst and methanol was used as alcohol for transesterification reactions. The fuel properties of methyl esters produced in the biodiesel pilot plant were characterized and compared to EN 14214 and ASTM D6751 biodiesel standards. According to the results, ester yield values of animal fat methyl esters were slightly lower than that of the corn oil methyl ester (COME). The production cost of COME was higher than those of animal fat methyl esters due to being high cost biodiesel feedstock. The fuel properties of produced methyl esters were close to each other. Especially, the sulfur content and cold flow properties of the COME were lower than those of animal fat methyl esters. The measured fuel properties of all produced methyl esters met ASTM D6751 (S500) biodiesel fuel standards.

  18. The MELISSA pilot plant facility as as integration test-bed for advanced life support systems

    NASA Technical Reports Server (NTRS)

    Godia, F.; Albiol, J.; Perez, J.; Creus, N.; Cabello, F.; Montras, A.; Masot, A.; Lasseur, Ch

    2004-01-01

    The different advances in the Micro Ecological Life Support System Alternative project (MELISSA), fostered and coordinated by the European Space Agency, as well as in other associated technologies, are integrated and demonstrated in the MELISSA Pilot Plant laboratory. During the first period of operation, the definition of the different compartments at an individual basis has been achieved, and the complete facility is being re-designed to face a new period of integration of all these compartments. The final objective is to demonstrate the potentiality of biological systems such as MELISSA as life support systems. The facility will also serve as a test bed to study the robustness and stability of the continuous operation of a complex biological system. This includes testing of the associated instrumentation and control for a safe operation, characterization of the chemical and microbial safety of the system, as well as tracking the genetic stability of the microbial strains used. The new period is envisaged as a contribution to the further development of more complete biological life support systems for long-term manned missions, that should be better defined from the knowledge to be gained from this integration phase. This contribution summarizes the current status of the Pilot Plant and the planned steps for the new period. c2004 COSPAR. Published by Elsevier Ltd. All rights reserved.

  19. Draft Title 40 CFR 191 compliance certification application for the Waste Isolation Pilot Plant. Volume 1

    SciTech Connect

    1995-03-31

    The Waste Isolation Pilot Plant (WIPP) is a research and development facility for the demonstration of the permanent isolation of transuranic radioactive wastes in a geologic formation. The facility was constructed in southeastern New Mexico in a manner intended to meet criteria established by the scientific and regulatory community for the safe, long-term disposal of transuranic wastes. The US Department of Energy (DOE) is preparing an application to demonstrate compliance with the requirements outlined in Title 40, Part 191 of the Code of Federal Regulations (CFR) for the permanent disposal of transuranic wastes. As mandated by the Waste Isolation Pilot Plant (WIPP) Land Withdrawal Act of 1992, the US Environmental Protection Agency (EPA) must evaluate this compliance application and provide a determination regarding compliance with the requirements within one year of receiving a complete application. Because the WIPP is a very complex program, the DOE has planned to submit the application as a draft in two parts. This strategy will allow for the DOE and the EPA to begin technical discussions on critical WIPP issues before the one-year compliance determination period begins. This report is the first of these two draft submittals.

  20. Effect of heating strategy on power consumption and performance of a pilot plant anaerobic digester.

    PubMed

    Espinosa-Solares, Teodoro; Valle-Guadarrama, Salvador; Bombardiere, John; Domaschko, Max; Easter, Michael

    2009-05-01

    The effect of heating strategy on power consumption and performance of a pilot plant anaerobic digester treating chicken litter, under thermophilic conditions, has been studied. Heating strategy was evaluated using three different spans (0.2 degrees C, 0.6 degrees C, and 1.0 degree C) for triggering the temperature control system from target temperature (56.7 degrees C). The hydraulic retention time in the pilot plant digester was in the range of 32 to 37 days, varying the total solids concentration fed from 5% to 6%. The results showed that under the experimental conditions, heating was the most energy-demanding process with 95.5% of the energy used. Increments up to 7.5% and 3.8%, respectively, on mechanical and heating power consumption, were observed as the span, for triggering the temperature control system from target temperature, was increased. Under the experimental conditions studied here, an increment of 30.6% on the global biodigester performance index was observed when a span of 1.0 degree C was compared to the one of 0.2 degrees C.

  1. The MELISSA pilot plant facility as an integration test-bed for advanced life support systems

    NASA Astrophysics Data System (ADS)

    Gòdia, F.; Albiol, J.; Pérez, J.; Creus, N.; Cabello, F.; Montràs, A.; Masot, A.; Lasseur, Ch.

    2004-01-01

    The different advances in the Micro Ecological Life Support System Alternative project (MELISSA), fostered and coordinated by the European Space Agency, as well as in other associated technologies, are integrated and demonstrated in the MELISSA Pilot Plant laboratory. During the first period of operation, the definition of the different compartments at an individual basis has been achieved, and the complete facility is being re-designed to face a new period of integration of all these compartments. The final objective is to demonstrate the potentiality of biological systems such as MELISSA as life support systems. The facility will also serve as a test bed to study the robustness and stability of the continuous operation of a complex biological system. This includes testing of the associated instrumentation and control for a safe operation, characterization of the chemical and microbial safety of the system, as well as tracking the genetic stability of the microbial strains used. The new period is envisaged as a contribution to the further development of more complete biological life support systems for long-term manned missions, that should be better defined from the knowledge to be gained from this integration phase. This contribution summarizes the current status of the Pilot Plant and the planned steps for the new period.

  2. The Melissa Pilot Plant Facility as an Integration Test-bed for Advanced Life Support Systems

    NASA Astrophysics Data System (ADS)

    Godia, F.; Albiol, J.; Perez, J.; Creus, N.; Cabello, F.; Montras, A.; Masot, A.; Lasseur, C.

    The MELISSA Pilot Plant laboratory provides the site where the different advances around the Micro Ecological Life Support System Alternative project coordinated and fostered by the European Space Agency, as well as other associated technologies, are integrated and demonstrated. During its first period of operation, the definition of the different compartments at an individual basis has been achieved, and the complete facility is being re- designed to face a new period of integration of all these compartments. The final objective is to demonstrate the potentiality of MELISSA as life support system, and to use this facility as a test bed to study the robustness and stability of the continuous operation of a complex biological systems. This includes the testing the associated instrumentation and control for a safe operation, characterization of the chemical and microbial safety of the loop, as well as tracking the genetic stability of the microbial strains used. This new period is envisaged as a contribution to the further development of more complete biological life support systems for long term manned missions, that should be better defined from the knowledge to be gained from this integration phase. The presentation will summarize the present status of the Pilot Plant and the planned steps for the new period.

  3. Reinvestigation into Closure Predictions of Room D at the Waste Isolation Pilot Plant

    SciTech Connect

    Reedlunn, Benjamin

    2016-10-01

    Room D was an in-situ, isothermal, underground experiment conducted at theWaste Isolation Pilot Plant between 1984 and 1991. The room was carefully instrumented to measure the horizontal and vertical closure immediately upon excavation and for several years thereafter. Early finite element simulations of salt creep around Room D under predicted the vertical closure by 4.5×, causing investigators to explore a series of changes to the way Room D was modeled. Discrepancies between simulations and measurements were resolved through a series of adjustments to model parameters, which were openly acknowledged in published reports. Interest in Room D has been rekindled recently by the U.S./German Joint Project III and Project WEIMOS, which seek to improve the predictions of rock salt constitutive models. Joint Project participants calibrate their models solely against laboratory tests, and benchmark the models against underground experiments, such as room D. This report describes updating legacy Room D simulations to today’s computational standards by rectifying several numerical issues. Subsequently, the constitutive model used in previous modeling is recalibrated two different ways against a suite of new laboratory creep experiments on salt extracted from the repository horizon of the Waste Isolation Pilot Plant. Simulations with the new, laboratory-based, calibrations under predict Room D vertical closure by 3.1×. A list of potential improvements is discussed.

  4. Pilot scale study on retrofitting conventional activated sludge plant for biological nutrient removal.

    PubMed

    Chiang, W W; Qasim, S R; Zhu, G; Crosby, E C

    1999-01-01

    Eutrophication of receiving waters due to the discharge of nitrogen and phosphorus through the wastewater effluent has received much interest in recent years. Numerous techniques have been proposed and aimed at retrofitting the existing conventional activated sludge process for nutrient removal. A pilot-scale research program was conducted to evaluate the effectiveness of a biological nutrient process for this purpose. The results indicated that creating an anoxic/anaerobic zone before aeration basin significantly enhances total phosphorus (TP) and total nitrogen (TN) removal. Without internal cycle, about 80 percent TP and TN removal were respectively achieved under their optimal conditions. However, adverse trends for phosphorus and nitrogen removal were observed when the ratio of return sludge to the influent was varied in the range between 0.5 and 3.0. The total phosphorus removal decreased as the concentration of BOD5 in the mixture of influent and return sludge decreased. Improved sludge settling properties and reduced foaming problems were also observed during the pilot plant operation. Based upon experimental results, the strategies to modify an existing conventional activated sludge plant into a biological nutrient removal (BNR) system are discussed.

  5. Impact of Corrections to the Spallings Volume Calculation on Waste Isolation Pilot Plant Performance Assessment [Poster

    SciTech Connect

    Kicker, Dwayne Curtis; Herrick, Courtney G; Zeitler, Todd

    2016-01-01

    The numerical code DRSPALL (from direct release spallings) is written to calculate the volume of Waste Isolation Pilot Plant solid waste subject to material failure and transport to the surface (i.e., spallings) as a result of a hypothetical future inadvertent drilling intrusion into the repository. An error in the implementation of the DRSPALL finite difference equations was discovered and documented in a software problem report in accordance with the quality assurance procedure for software requirements. This paper describes the corrections to DRSPALL and documents the impact of the new spallings data from the modified DRSPALL on previous performance assessment calculations. Updated performance assessments result in more simulations with spallings, which generally translates to an increase in spallings releases to the accessible environment. Total normalized radionuclide releases using the modified DRSPALL data were determined by forming the summation of releases across each potential release pathway, namely borehole cuttings and cavings releases, spallings releases, direct brine releases, and transport releases. Because spallings releases are not a major contributor to the total releases, the updated performance assessment calculations of overall mean complementary cumulative distribution functions for total releases are virtually unchanged. Therefore, the corrections to the spallings volume calculation did not impact Waste Isolation Pilot Plant performance assessment calculation results.

  6. Impact of Corrections to the Spallings Volume Calculation on Waste Isolation Pilot Plant Performance Assessment

    SciTech Connect

    Kicker, Dwayne Curtis; Herrick, Courtney G; Zeitler, Todd

    2015-11-01

    The numerical code DRSPALL (from direct release spallings) is written to calculate the volume of Waste Isolation Pilot Plant solid waste subject to material failure and transport to the surface (i.e., spallings) as a result of a hypothetical future inadvertent drilling intrusion into the repository. An error in the implementation of the DRSPALL finite difference equations was discovered and documented in a software problem report in accordance with the quality assurance procedure for software requirements. This paper describes the corrections to DRSPALL and documents the impact of the new spallings data from the modified DRSPALL on previous performance assessment calculations. Updated performance assessments result in more simulations with spallings, which generally translates to an increase in spallings releases to the accessible environment. Total normalized radionuclide releases using the modified DRSPALL data were determined by forming the summation of releases across each potential release pathway, namely borehole cuttings and cavings releases, spallings releases, direct brine releases, and transport releases. Because spallings releases are not a major contributor to the total releases, the updated performance assessment calculations of overall mean complementary cumulative distribution functions for total releases are virtually unchanged. Therefore, the corrections to the spallings volume calculation did not impact Waste Isolation Pilot Plant performance assessment calculation results.

  7. Reinvestigation into Closure Predictions of Room D at the Waste Isolation Pilot Plant

    SciTech Connect

    Reedlunn, Benjamin

    2016-09-27

    Room D was an in-situ, isothermal, underground experiment conducted at the Waste Isolation Pilot Plant between 1984 and 1991. The room was carefully instrumented to measure the horizontal and vertical closure immediately upon excavation and for several years thereafter. Early finite element simulations of salt creep around Room D under predicted the vertical closure by 4.5×, causing investigators to explore a series of changes to the way Room D was modeled. Discrepancies between simulations and measurements were resolved through a series of adjustments to model parameters, which were openly acknowledged in published reports. Interest in Room D has been rekindled recently by the U.S./German Joint Project III and Project WEIMOS, which seek to improve the predictions of rock salt constitutive models. Joint Project participants calibrate their models solely against laboratory tests, and benchmark the models against underground experiments, such as room D. This report describes updating legacy Room D simulations to today’s computational standards by rectifying several numerical issues. Subsequently, the constitutive model used in previous modeling is recalibrated two different ways against a suite of new laboratory creep experiments on salt extracted from the repository horizon of the Waste Isolation Pilot Plant. Simulations with the new, laboratory-based, calibrations under predict Room D vertical closure by 3.1×. A list of potential improvements is discussed.

  8. Nitrous oxide emissions from the oxidation tank of a pilot activated sludge plant.

    PubMed

    Lotito, Adriana Maria; Wunderlin, Pascal; Joss, Adriano; Kipf, Marco; Siegrist, Hansruedi

    2012-07-01

    This study discusses the results of the continuous monitoring of nitrous oxide emissions from the oxidation tank of a pilot conventional wastewater treatment plant. Nitrous oxide emissions from biological processes for nitrogen removal in wastewater treatment plants have drawn great attention over the last years, due to the high greenhouse effect. However, even if several studies have been carried out to quantify nitrous oxide emission rates from different types of treatment, quite wide ranges have been reported. Only grab samples or continuous measurements over limited periods were considered in previous studies, which can account for the wide variability of the obtained results. Through continuous monitoring over several months, our work tries to fill this gap of knowledge and get a deeper insight into nitrous oxide daily and weekly emission dynamics. Moreover, the influence of some operating conditions (sludge age, dissolved oxygen concentration in the oxidation tank, nitrogen load) was studied to determine good practices for wastewater treatment plant operation aiming at the reduction of nitrous oxide emissions. The dissolved oxygen set-point is shown to play a major role in nitrous oxide emissions. Low sludge ages and high nitrogen loads are responsible for higher emissions as well. An interesting pattern has been observed, with quite negligible emissions during most of the day and a peak with a bell-like shape in the morning in the hours of maximum nitrogen load in the plant, correlated to the ammonia and nitrite peaks in the tank.

  9. MELiSSA Pilot Plant: A facility for ground demonstration of a closed life support system

    NASA Astrophysics Data System (ADS)

    Godia, Francesc; Fossen, Arnaud; Peiro, Enrique; Gerbi, Olivier; Dussap, Gilles; Leys, Natalie; Arnau, Carolina; Milian, Ernest

    MELiSSA (Micro Ecological Life Support System Alternative) is an international collaborative effort focused on the development of a Life Support System for long-term Space missions. The goals of the MELiSSA loop are the recovery of food, water and oxygen from wastes, i.e. CO2 and organic wastes, using light as a source of energy. It is conceived as a series of compartments, each one performing a specific function within this cycle, inspired in the terrestrial ecological systems. Each one of the compartments is colonized with specific bacteria or higher plants depending on its dedicated function. Therefore, its design and operational conditions should guarantee that only a given specific biological activity takes place in each compartment. Moreover, this has to be done in a controlled manner, both at the subsystems level (i.e., compartments) and at the overall system level (i.e., complete loop). In order to achieve the complete operation of such a Closed Ecological System, in a first step each compartment has to be developed at individual level, and its operation demonstrated under its associated control law. In a second step, the complete loop needs to be integrated by the connection of the different compartments in the gas, loop and solid phases. An extensive demonstration of MELiSSA loop under terrestrial conditions is a mandatory step in the process of its adaptation to space. This is the main goal of the MPP. The demonstration scenario for the MPP is the respiration equivalent of a human being, and production of 20 percent of the diet of one person. To serve this goal, the different compartments of the MELiSSA loop have been designed and sized at the pilot scale level, and further characterized. Nowadays, the focus of the MELiSSA Pilot Plant is on the integration of its compartments. To this end, the integration challenge is concentrated in three compartments devoted to the following functions: nitrification (Compartment 3, an axenic co-culture of Nitrosomonas

  10. Pilot uranium lysimeter studies at the Oak Ridge Y-12 plant

    SciTech Connect

    Francis, C.W.; Hyder, L.K.; Howard, S.C.; Cline, J.E.; Clapp, R.B.

    1993-08-01

    A field lysimeter test facility has been constructed at the Oak Ridge Y-12 plant to evaluate land burial of wastes containing depleted uranium. The principal objective in the construction of such a facility is to provide a means for monitoring waste leachate characteristics over time, in particular uranium concentrations in leachate. The design of the field lysimeter test facility allows, via the portals along the side walls of the lysimeter, the collection of leachate as a function of depth in the lysimeter. The methodology to collect leachate from within the field lysimeter has not been clearly defined. Thus, before wastes were loaded into the field lysimeter facility, a pilot lysimeter study was initiated to test several design concepts for the collection of in situ leachate. The primary objective of this pilot study was to demonstrate the feasibility and quality assurance of proposed instrumentation used to monitor leachate generation and characteristics in the full-scale field lysimeter. Secondary objectives included gaining experience in the handling/packing of wastes, installation/operation of the leachate collection devices, and waste leachate characterization

  11. Performances and fouling control of a flat sheet membrane in a MBR pilot-plant.

    PubMed

    Grélot, A; Grelier, P; Tazi-Pain, A; Lesjean, B; Brüss, U; Grasmick, A

    2010-01-01

    This paper deals with the performance and the optimisation of the hydraulic operating conditions of the A3 Water Solutions flat sheet membrane technology in a MBR pilot-plant to achieve a satisfying fouling control and also a reduction in the required aeration. Two vertically stacked modules were tested at pilot-scale at Anjou Recherche under typical biological operating conditions (mixed liquor suspended solids concentration (MLSS) =10 g/l; sludge retention time (SRT) =28 days; food to microorganism ratio (F/M)=0.12 kg COD/kg MLSS/d). The use of a double-deck and of specific backwashes for this membrane technology enabled to achieve satisfying membrane performances for a net flux of 25 L h(-1) m(-2), 20 degrees C at a low specific aeration demand per membrane surface (SADm = 0.2 Nm(3) h(-1) m(-2)) which corresponds to a specific aeration demand per permeate volume unit (SADp) of 8 Nm(3) air/m(3) permeate, which is lower than reported for many commercial membrane systems. The mixed liquor characteristics (foaming, MLSS concentration) appeared to influence the fouling behaviour of the membranes but no correlation was found with the fouling rate. However, with the new operating conditions, the system is robust and can cope with fouling resulting from biological stress and daily peak flows for MLSS concentrations in the membrane tank up to 18 g/l.

  12. Optimising the operation of a MBR pilot plant by quantitative analysis of the membrane fouling mechanism.

    PubMed

    Jiang, T; Kennedy, M D; Guinzbourg, B F; Vanrolleghem, P A; Schippers, J C

    2005-01-01

    In order to optimize some operational conditions of MBR systems, a MBR pilot plant equipped with a submerged hollow fibre membrane module was employed in this study. The pilot MBR was fed with real municipal wastewater and the filtration flux, backwashing interval, aeration frequency and temperature were varied. A filtration flux below 25 I/m2h is generally recommended, at below this flux, the MBR operated at sub-critical flux conditions, the filter cake was minimized and membrane fouling was mainly attributed to the membrane pore blocking. Moreover, the membrane fouling, at below 25 I/m2h, was more reversible to backwashing; above this value, backwashing became less efficient to clean the membrane. Less frequent backwashing (e.g. 600 s filtration/45 s backwashing) decreased the amount of fouling irreversible to backwashing and its performance was superior to that of frequent backwashing (e.g. 200 s filtration/15 s backwashing). The MBR suffered more fouling at low temperature conditions (e.g. at 13-14 degrees C) than at high temperature conditions (e.g. at 17-18 degrees C). A conceptual model was built up and successfully interpreted this temperature effect.

  13. Nitrogen removal rates at a technical-scale pilot plant with the one-stage partial nitritation/Anammox process.

    PubMed

    Cema, G; Szatkowska, B; Plaza, E; Trela, J; Surmacz-Górska, J

    2006-01-01

    Traditional nitrification/denitrification is not suitable for nitrogen removal when wastewater contains high concentrations of ammonium nitrogen and low concentrations of biodegradable carbon. Recently, a deammonification process was developed and proposed as a new technology for treatment of such streams. This process relies on a stable interaction between aerobic bacteria Nitrosomonas, that accomplish partial nitritation and anaerobic bacteria Planctomycetales, which conduct the Anammox reaction. Simultaneous performance of these two processes can lead to a complete autotrophic nitrogen removal in one single reactor. The experiments where nitrogen was removed in one reactor were performed at a technical-scale moving-bed pilot plant, filled with Kaldnes rings and supplied with supernatant after dewatering of digested sludge. It was found that a nitrogen removal rate obtained at the pilot plant was 1.9 g m(-2) d(-1). Parallel to the pilot plant run, a series of batch tests were carried out under anoxic and aerobic conditions. Within the batch tests, where the pilot plant's conditions were simulated, removal rates reached up to 3 g N m(-2)d(-1). Moreover, the batch tests with inhibition of Nitrosomonas showed that only the Anammox bacteria (not anoxic removal by Nitrosomonas) are responsible for nitrogen removal.

  14. Demonstration of a 100-kWth high-temperature solar thermochemical reactor pilot plant for ZnO dissociation

    NASA Astrophysics Data System (ADS)

    Koepf, E.; Villasmil, W.; Meier, A.

    2016-05-01

    Solar thermochemical H2O and CO2 splitting is a viable pathway towards sustainable and large-scale production of synthetic fuels. A reactor pilot plant for the solar-driven thermal dissociation of ZnO into metallic Zn has been successfully developed at the Paul Scherrer Institute (PSI). Promising experimental results from the 100-kWth ZnO pilot plant were obtained in 2014 during two prolonged experimental campaigns in a high flux solar simulator at PSI and a 1-MW solar furnace in Odeillo, France. Between March and June the pilot plant was mounted in the solar simulator and in-situ flow-visualization experiments were conducted in order to prevent particle-laden fluid flows near the window from attenuating transparency by blocking incoming radiation. Window flow patterns were successfully characterized, and it was demonstrated that particle transport could be controlled and suppressed completely. These results enabled the successful operation of the reactor between August and October when on-sun experiments were conducted in the solar furnace in order to demonstrate the pilot plant technology and characterize its performance. The reactor was operated for over 97 hours at temperatures as high as 2064 K; over 28 kg of ZnO was dissociated at reaction rates as high as 28 g/min.

  15. Resource Conservation and Recovery Act, Part B permit application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 1, Revision 3

    SciTech Connect

    Not Available

    1993-03-01

    This volume includes the following chapters: Waste Isolation Pilot Plant RCRA A permit application; facility description; waste analysis plan; groundwater monitoring; procedures to prevent hazards; RCRA contingency plan; personnel training; corrective action for solid waste management units; and other Federal laws.

  16. DETERMINATION OF SEX HORMONES AND NONYLPHENOL ETHOXYLATES IN THE AQUEOUS MATRIXES OF TWO PILOT-SCALE MUNICIPAL WASTEWATER TREATMENT PLANTS

    EPA Science Inventory

    Two analytical methods were developed and refined for the detection and quantitation of two groups of endocrine-disrupting chemicals (EDCs) in the liquid matrixes of two pilot-scale municipal wastewater treatment plants. The targeted compounds are seven sex hormones (estradiol, ...

  17. Environmental geophysics of the Pilot Plant on the west branch of Canal Creek, Aberdeen Proving Ground, Maryland

    SciTech Connect

    McGinnis, L.D.; Miller, S.F.; Daudt, C.R.; Thompson, M.D.; Borden, H.; Benson, M.; Wrobel, J.

    1994-05-01

    Plans to demolish and remediate the Pilot Plant complex in the Edgewood Area of Aberdeen Proving Ground have served to initiate a series of nonintrusive, environmental-geophysical studies. The studies are assisting in the location and identification of pipes, tanks, trenches, and liquid waste in the subsurface. Multiple databases have been integrated to provide support for detection of underground utilities and to determine the stratigraphy and lithology of the subsurface. The studies were conducted within the double security fence and exterior to the double fence, down gradient toward the west branch of Canal Creek. To determine if contaminants found in the creek were associated with the Pilot Plant, both the east and west banks were included in the study area. Magnetic, conductivity, inductive emf, and ground-penetrating-radar anomalies outline buried pipes, trenches, and various pieces of hardware associated with building activities. Ground-penetrating-radar imagery also defines a paleovalley cut 30 ft into Potomac Group sediments of Cretaceous age. The paleovalley crosses the site between Building E5654 and the Pilot Plant fence. The valley is environmentally significant because it may control the pathways of contaminants. The Pilot Plant complex was used to manufacture CC2 Impregnite and incapacitating agents; it also served as a production facility for nerve agents.

  18. Model tests of a baseline 40 MW OTEC pilot plant. Volume A: Narrative report

    NASA Astrophysics Data System (ADS)

    George, J. F.; Stadler, J. T.; Donnelly, H. L.; Richards, D.; Biewer, F. N.; Hutchinson, B. L.

    1981-01-01

    A baseline design of an ocean thermal energy conversion (OTEC) pilot plant, configured as a floating platform for large scale, at-sea, practical demonstrations of OTEC system operation, has been completed. Model tests at 1/30 scale were conducted in a model basin. Waves were produced to simulate a variety of ocean conditions, including 100- year storm seas where hurricane waves equivalent to a maximum height of 65 ft were created. The platform survived all simulated conditions, although it was observed that a shaped bow, bilge keels, and additional hull length would improve seakeeping in the hurricane seas. Quantitative data were obtained on ship motions, cold water pipe loads and motions, mooring forces, and seawater system pressures.

  19. Model tests of a baseline 40 MW pilot plant. Volume B: Test data

    NASA Astrophysics Data System (ADS)

    George, J. F.; Stadter, J. T.; Donnelly, H. L.; Richards, D.; Brewer, F. N.; Hutchison, B. L.

    1981-01-01

    A baseline design of an OTEC pilot plant, configured as a floating platform for large scale, at sea, practical demonstrations of OTEC system operation, was completed. Model tests at 1/30 scale were conducted in a model basin. Waves were produced to simulate a variety of ocean conditions, including 100 year storm seas where hurricane waves equivalent to a maximum height of 65 ft were created. The platform survived all simulated conditions, although it was observed that a shaped bow, bilge keels, and additional hull length would improve seakeeping in the hurricane seas. Quantitative data were obtained on ship motions, cold water pipe loads and motions, mooring forces, and seawater system pressures. a compilation of the test data is presented.

  20. Hydraulic Testing of Salado Formation Evaporites at the Waste Isolation Pilot Plant Site: Final Report

    SciTech Connect

    Beauheim, Richard L.; Domski, Paul S.; Roberts, Randall M.

    1999-07-01

    This report presents interpretations of hydraulic tests conducted in bedded evaporates of the Salado Formation from May 1992 through May 1995 at the Waste Isolation Pilot Plant (WIPP) site in southeastern New Mexico. The WIPP is a US Department of Energy research and development facility designed to demonstrate safe disposal of transuranic wastes from the nation's defense programs. The WIPP disposal horizon is located in the lower portion of the Permian Salado Formation. The hydraulic tests discussed in this report were performed in the WIPP underground facility by INTERA inc. (now Duke Engineering and Services, Inc.), Austin, Texas, following the Field Operations Plan and Addendum prepared by Saulnier (1988, 1991 ) under the technical direction of Sandia National Laboratories, Albuquerque, New Mexico.

  1. Microbial Gas Generation Under Expected Waste Isolation Pilot Plant Repository Conditions: Final Report

    SciTech Connect

    Gillow, J.B.; Francis, A.

    2011-07-01

    Gas generation from the microbial degradation of the organic constituents of transuranic (TRU) waste under conditions expected in the Waste Isolation Pilot Plant (WIPP) was investigated. The biodegradation of mixed cellulosic materials and electron-beam irradiated plastic and rubber materials (polyethylene, polyvinylchloride, hypalon, leaded hypalon, and neoprene) was examined. We evaluated the effects of environmental variables such as initial atmosphere (air or nitrogen), water content (humid ({approx}70% relative humidity, RH) and brine inundated), and nutrient amendments (nitogen phosphate, yeast extract, and excess nitrate) on microbial gas generation. Total gas production was determined by pressure measurement and carbon dioxide (CO{sub 2}) and methane (CH{sub 4}) were analyzed by gas chromatography; cellulose degradation products in solution were analyzed by high-performance liquid chromatography. Microbial populations in the samples were determined by direct microscopy and molecular analysis. The results of this work are summarized.

  2. Identification and evaluation of appropriate backfills for the Waste Isolation Pilot Plant (WIPP)

    SciTech Connect

    Bynum, R.V.; Stockman, C.; Papenguth, H.

    1998-08-01

    A backfill system has been designed for the Waste Isolation Pilot Plant (WIPP) which will control the chemical environment of the post-closure repository to a domain where the actinide solubility is within its lowest region. The actinide solubility is highly dependent on the chemical species which constitute the fluid, the resulting pH of the fluid, and the oxidation state of the actinide which is stable under the specific conditions. The use of magnesium oxide (MgO) has the backfill material not only controls the pH of the expected fluids, but also effectively removes carbonate from the system, which has a significant impact on actinide solubility. The backfill selection process, emplacement system design, and confirmatory experimental results are presented.

  3. Limestone/adipic acid FGD and stack opacity reduction pilot plant tests at Big Rivers

    SciTech Connect

    Laslo, D.; Bakke, E.; Chisholm, E.

    1984-01-01

    Big Rivers Electric Corporation (BREC) contracted Peabody Process Systems, Inc. (PPSI) to install a flue gas cleaning (FGC) pilot plant at the BREC R.D. Green Station Unit No. 2 located at Sebree, KY. A six month test program was completed demonstrating technology for: alternatives to using lime as an alkali; methods for improving cake dewatering; identification of the causes of high stack opacity; and methods for the reduction of high stack opacity. This paper presents highlights extracted from the reports submitted by PPSI to BREC on this test program. BREC was primarily interested in reduction of operating costs, if possible, by using an alkali less expensive than lime, and by improving the poor dewatering characteristic inherent in a dolomitic lime system. BREC was also within compliance for particulate emissions and opacity in the duct after the dry electrostatic precipitator, but not in compliance with the stack opacity regulation, and therefore wanted to investigate methods for stack opacity reduction.

  4. Evaluation of decommissioning alternatives for the Pilot Plant Complex, Aberdeen Proving Ground

    SciTech Connect

    Rueda, J.; Zimmerman, R.E.

    1995-09-01

    This report presents an evaluation of four decommissioning alternatives for the Pilot Plant Complex (PPC), an inactive chemical weapons research, development, and production facility consisting of nine buildings located in the Edgewood Area of the Aberdeen Proving Ground in Maryland. Decommissioning the PPC involves six steps: (1) assessing existing conditions; (2) dismantling the aboveground portions of the buildings (including the floor slabs, paved roads, and sidewalks within the PPC); (3) reducing the size of the demolition debris and sealing the debris in containers for later testing and evaluation; (4) testing and evaluating the debris; (5) conducting site operation and maintenance activities; and (6) recycling or disposing of the debris with or without prior treatment, as appropriate.

  5. Final compliance criteria (40 CFR part 194) for the Waste Isolation Pilot Plant (WIPP)

    SciTech Connect

    Marcinowski, F.; Kruger, M.; Forinash, E.

    1996-06-01

    The Waste Isolation Pilot Plant (WIPP), which is under development by the Department of Energy (DOE), is a potential geologic disposal system for defense transuranic (TRU) radioactive waste. Pursuant to the 1992 WIPP Land Withdrawal Act, the U.S. Environmental Protection Agency (EPA) is required to perform several activities including, but not limited to, issuing criteria for determining whether the WIPP complies with the radioactive waste disposal standards in 40 CFR part 191. EPA finalized these compliance criteria (40 CFR part 194), intended to implement the 40 CFR part 191 disposal standards specifically at the WIPP, in February 1996. The paper presents the Agency`s approach to WIPP`s compliance demonstration. This program is unique because the EPA`s approach Laken at the WIPP may set precedent for future approaches Liken at other radioactive disposal facilities. This document addresses many of the nuclear waste issues that are of considerable concern to the public.

  6. Recovery of protactinium-231 and thorium-230 from cotter concentrate: pilot plant operatins and process development

    SciTech Connect

    Hertz, M.R.; Figgins, P.E.; Deal, W.R.

    1983-02-10

    The equipment and methods used to recover and purify 339 g of thorium-230 and 890 mg of protactinium-231 from 22 of the 1251 drums of Cotter Concentrate are described. The process developed was (1) dissolution at 100/sup 0/C in concentrated nitric acid and dilution to 2 to 3 molar acid, (2) filtration to remove undissolved solids (mostly silica filter aid), (3) extraction of uranium with di-sec-butyl-phenyl phophonate (DSBPP) in carbon tetrachloride, (4) extraction of both thorium and protactinium with tri-n-octylphosphine oxide (TOPO) in carbon tetrachloride followed by selective stripping of the thorium with dilute of sulfuric acid, (5) thorium purification using oxalic acid, (6) stripping protactinium from the TOPO with oxalic acid, and (7) protactinium purification through a sequence of steps. The development of the separation procedures, the design of the pilot plant, and the operating procedures are described in detail. Analytical procedures are given in an appendix. 8 figures, 4 tables.

  7. Modeling of Human Intrusion Scenarios at the Waste Isolation Pilot Plant

    SciTech Connect

    Gross, M.B.; Hansen, F.D.; Knowles, M.K.; Larson, K.W.; Thompson, T.W.

    1998-12-04

    The Waste Isolation Pilot Plant is a mined, geologic repository designed for permanent disposal of transuranic waste. The facility is owned by the United States Department of Energy, and licensed for operations by the Environmental Protection Agency. Compliance with license requirements dictates that the repository must comply with regulatory stipulations that performance assessment calculations include the effects of resource exploitation on probable releases. Scenarios for these releases incorporate inadvertent penetration of the repository by an exploratory drilling operation. This paper presents the scenarios and models used to predict releases from the repository to the biosphere during. an inadvertent intrusion into the waste disposal regions. A summary of model results and conclusions is also presented.

  8. Transporting transuranic waste to the Waste Isolation Pilot Plant: Risk and cost perspectives

    SciTech Connect

    Biwer, B. M.; Gilette, J. L.; Poch, L. A.; Suermann, J. F.

    1999-02-16

    The Waste Isolation Pilot Plant (WIPP) is an authorized US Department of Energy (DOE) research and development facility constructed near the city of Carlsbad in southeastern New Mexico. The facility is intended to demonstrate the safe disposal of transuranic (TRU) radioactive waste resulting from US defense activities. Under the WIPP Land Withdrawal Act of 1992 (LWA), federal lands surrounding the WIPP facility were withdrawn from all public use and the title of those lands was transferred to the Secretary of Energy. The DOE's TRU waste is stored, and in some cases is still being generated, at 10 large-quantity and 13 small-quantity sites across the US. After applicable certification requirements have been met, the TRU waste at these sites will be sent to the WIPP to initiate the disposal phase of the facility, which according to current planning is projected to last for approximately 35 years.

  9. A formal expert judgment procedure for performance assessments of the Waste Isolation Pilot Plant

    SciTech Connect

    Trauth, K.M.; Guzowski, R.V.; Hora, S.C.

    1994-09-01

    The Waste Isolation Pilot Plant (WIPP) is an experimental facility located in southeastern New Mexico. It has been designed to determine the feasibility of the geologic disposal of defense-generated transuranic waste in a deep bedded-salt formation. The WIPP was also designed for disposal and will operate in that capacity if approved. The WIPP Performance Assessment Department at Sandia National Laboratories has been conducting analyses to assess the long-term performance of the WIPP. These analyses sometimes require the use of expert judgment. This Department has convened several expert-judgment panels and from that experience has developed an internal quality-assurance procedure to guide the formal elicitation of expert judgment. This protocol is based on the principles found in the decision-analysis literature.

  10. Waste Isolation Pilot Plant Title I operator dose calculations. Final report, LATA report No. 90

    SciTech Connect

    Hughes, P.S.; Rigdon, L.D.

    1980-02-01

    The radiation exposure dose was estimated for the Waste Isolation Pilot Plant (WIPP) operating personnel who do the unloading and transporting of the transuranic contact-handled waste. Estimates of the radiation source terms for typical TRU contact-handled waste were based on known composition and properties of the waste. The operations sequence for waste movement and storage in the repository was based upon the WIPP Title I data package. Previous calculations had been based on Conceptual Design Report data. A time and motion sequence was developed for personnel performing the waste handling operations both above and below ground. Radiation exposure calculations were then performed in several fixed geometries and folded with the time and motion studies for individual workers in order to determine worker exposure on an annual basis.

  11. Waste Isolation Pilot Plant site environmental report for calendar year 1990

    SciTech Connect

    Not Available

    1990-01-01

    The US Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) Operational Environmental Monitoring Plan (OEMP) monitors a comprehensive set of parameters in order to detect any potential environmental impacts and establish baselines for future quantitative environmental impact evaluations. Surface water and groundwater, soil, and biotics are measured for background radiation. Nonradiological environmental monitoring activities include meteorological, air quality, soil properties, and the status of the local biological community. Ecological studies focus on the immediate area surrounding the site with emphasis on the salt storage pile, whereas baseline radiological surveillance covers a broader geographic area including nearby ranches, villages, and cities. Since the WIPP is still in a preoperational state, no waste has been received; therefore, certain elements required by Order DOE 5400.1 are not presented in this report. 15 figs. 19 tabs.

  12. Safety Evaluation Report of the Waste Isolation Pilot Plant Contact Handled (CH) Waste Documented Safety Analysis

    SciTech Connect

    Washington TRU Solutions LLC

    2005-09-01

    This Safety Evaluation Report (SER) documents the Department of Energy’s (DOE's) review of Revision 9 of the Waste Isolation Pilot Plant Contact Handled (CH) Waste Documented Safety Analysis, DOE/WIPP-95-2065 (WIPP CH DSA), and provides the DOE Approval Authority with the basis for approving the document. It concludes that the safety basis documented in the WIPP CH DSA is comprehensive, correct, and commensurate with hazards associated with CH waste disposal operations. The WIPP CH DSA and associated technical safety requirements (TSRs) were developed in accordance with 10 CFR 830, Nuclear Safety Management, and DOE-STD-3009-94, Preparation Guide for U. S. Department of Energy Nonreactor Nuclear Safety Analysis Reports.

  13. Development of quality assurance and performance testing for the Process Experimental Pilot Plant

    SciTech Connect

    Dole, L.R.; McDaniel, E.W.; Robinson, S.M.

    1984-08-01

    The Process Experimental Pilot Plant (PREPP) is planned for operation by EG and G Idaho, Inc., to demonstrate a full-scale, cement-based, disposal process for transuranic (TRU) wastes. Procedures need to be developed to determine the quality of the waste product during processing and the durability of the final waste form produced in this facility. This report summarizes basic guidelines for the selection of the waste form composition and process conditions that affect product performance. Physical property tests that may be applicable for quality assurance during processing are also described. Approaches to accelerated performance tests needed to predict the performance of the cement-based waste form are identified, and suggestions are made for the development of processing tests to ensure the quality of the final waste-host product. 29 references, 3 figures, 4 tables.

  14. Development of quality assurance and performance testing for the Process Experimental Pilot Plant

    SciTech Connect

    Dole, L.R.; McDaniel, E.W.; Robinson, S.M.

    1984-06-01

    The Process Experimental Pilot Plant (PREPP) is planned for operation by EG and G Idaho, Inc., to demonstrate a full-scale, cement-based, disposal process for transuranic (TRU) wastes. Procedures need to be developed to determine the quality of the waste product during processing and the durability of the final waste form produced in this facility. This report summarizes basic guidelines for the selection of the waste form composition and process conditions that affect product performance. Physical property tests that may be applicable for quality assurance during processing are also described. Approaches to accelerated performance tests needed to predict the performance of the cement-based waste form are identified, and suggestions are made for the development of processing tests to assure the quality of the final waste-host product. 29 references, 3 figures, 3 tables.

  15. Environmental management assessment of the Waste Isolation Pilot Plant (WIPP), Carlsbad, New Mexico

    SciTech Connect

    Not Available

    1993-07-01

    This document contains the results of the Environmental Management Assessment of the Waste Isolation Pilot Plant (WIPP). This Assessment was conducted by EH-24 from July 19 through July 30, 1993 to advise the Secretary of Energy of the adequacy of management systems established at WIPP to ensure the protection of the environment and compliance with Federal, state, and DOE environmental requirements. The mission of WIPP is to demonstrate the safe disposal of transuranic (TRU) waste. During this assessment, activities and records were reviewed and interviews were conducted with personnel from the management and operating contractors. This assessment revealed that WIPP`s environmental safety and health programs are satisfactory, and that all levels of the Waste Isolation Division (WID) management and staff consistently exhibit a high level of commitment to achieve environmental excellence.

  16. Scenario development for the Waste Isolation Pilot Plant: Building confidence in the assessment

    SciTech Connect

    Galson, D.A.; Swift, P.N.

    1994-03-01

    Scenario developments is part of the iterative performance assessment (PA) process for the Waste Isolation Pilot Plant (WIPP). Scenario development for the WIPP has been the subject of intense external review, and is certain to be the subject of continued scrutiny as the project proceeds toward regulatory compliance. The principal means of increasing confidence is this aspect of the PA will be through the use of a systematic and thorough procedure toward developing the scenarios and conceptual models on which the assessment is to be based. Early and ongoing interaction with project reviewers can assist with confidence building. Quality of argument and clarity of presentation in PA will be of key concern. Appropriate tools are required for documenting and tracking assumptions, through a single assessment phase, and between iterative assessment phases. Risks associated with future human actions are of particular concern to the WIPP project, and international consensus on the principles for incorporation of future human actions in assessments would be valuable.

  17. Historical Background on the Performance Assessment for the Waste Isolation Pilot Plant

    SciTech Connect

    RECHARD, ROBERT P

    1999-10-21

    In 1979, six years after selecting the Delaware Basin as a potential disposal area, Congress authorized the U.S. Department of Energy to build the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico, as a Research and development facility for the safe management storage, and disposal of waste contaminated with transuranic radioisotopes. In 1998, 19 years after authorization and after site selection, the U.S. Environmental Protection Agency (EPA) certified that the WIPP disposal system complied with its regulations. The EPA's decision was primarily based on the results from a performance. assessment conducted in 1996, which is summarized in this special issue of Reliability Engineering and System Safety. This performance assessment was the culmination of four preliminary performance assessments conducted between 1989 and 1992. This paper provides a historical setting and context for how the performance of the deep geologic repository at the WIPP was analyzed. Also included is background on political forces acting on the project.

  18. Waste Isolation Pilot Plant disposal phase supplemental environmental impact statement. Implementation plan

    SciTech Connect

    1996-05-01

    The Implementation Plan for the Waste Isolation Pilot Plant Disposal Phase Supplemental Environmental Impact Statement (SEIS-II) has two primary purposes: (1) To report on the results of the scoping process (2) To provide guidance for preparing SEIS-II SEIS-II will be the National Environmental Policy Act (NEPA) review for WIPP`s disposal phase. Chapter 1 of this plan provides background on WIPP and this NEPA review. Chapter 2 describes the purpose and need for action by the Department of Energy (hereafter DOE or the Department), as well as a description of the Proposed Action and alternatives being considered. Chapter 3 describes the work plan, including the schedule, responsibilities, and planned consultations with other agencies and organizations. Chapter 4 describes the scoping process, presents major issues identified during the scoping process, and briefly indicates how issues will be addressed in SEIS-II.

  19. Environmental thermoluminescent dosimetry measurements at the WIPP (Waste Isolation Pilot Plant) Site, 1976-1985

    SciTech Connect

    Thompson, D.J.

    1988-02-01

    In 1975, the US Energy Research and Development Administration began evaluating a site in southeastern New Mexico for the possible construction and operation of a Waste Isolation Pilot Plant. The purpose of the facility was to test and demonstrate the operations and technical principles of a permanent repository in bedded salt for ERDA-generated transuranic radioactive waste. An extensive preoperational environmental study program to document the region's meterorology, geology, hydrology, flora and fauna, existing air and water quality, and background radiation was undertaken by Sandia National Laboratories. The purpose of this document is to report the final results of environmental thermoluminescent dosimeter measurements performed from January 1976 through December 1985. The final results were obtained by reevaluating the quarterly raw data using a uniform analysis procedure. 6 refs., 4 figs., 2 tabs.

  20. Characterization of subjective uncertainty in the 1996 performance assessment for the Waste Isolation Pilot Plant

    SciTech Connect

    HELTON,JON CRAIG; MARTELL,MARY-ALENA; TIERNEY,MARTIN S.

    2000-05-18

    The 1996 performance assessment (PA) for the Waste Isolation Pilot Plant (WIPP) maintains a separation between stochastic (i.e., aleatory) and subjective (i.e., epistemic) uncertainty, with stochastic uncertainty arising from the possible disruptions that could occur at the WIPP over the 10,000 yr regulatory period specified by the US Environmental Protection Agency (40 CFR 191,40 CFR 194) and subjective uncertainty arising from an inability to uniquely characterize many of the inputs required in the 1996 WIPP PA. The characterization of subjective uncertainty is discussed, including assignment of distributions, uncertain variables selected for inclusion in analysis, correlation control, sample size, statistical confidence on mean complementary cumulative distribution functions, generation of Latin hypercube samples, sensitivity analysis techniques, and scenarios involving stochastic and subjective uncertainty.

  1. Letdown valve (anti eroded type for slurry use) on 150 t/d coal liquefaction pilot plant

    SciTech Connect

    Kamada, Mitsushi; Kobayashi, Masatoshi; Yoshida, Haruhiko; Yamagiwa, Hisashi

    1999-07-01

    The letdown valve developed by NEDO has been tested on the 150 t/d coal liquefaction pilot plant using the NEDOL process for more than 6,000 hours of on-coal operation. Several factors affecting the damage of the letdown valve that handled a fluid containing coal-derived oil, catalyst and residue including ash have been evaluated. The countermeasure for the damage has been studied to develop an advanced letdown valve to be used demonstration plant.

  2. Evapotranspiration from pilot-scale constructed wetlands planted with Phragmites australis in a Mediterranean environment.

    PubMed

    Milani, Mirco; Toscano, Attilio

    2013-01-01

    This article reports the results of evapotranspiration (ET) experiments carried out in Southern Italy (Sicily) in a pilot-scale constructed wetland (CW) made of a combination of vegetated (Phragmites australis) and unvegetated sub-surface flow beds. Domestic wastewater from a conventional wastewater treatment plant was used to fill the beds. Microclimate data was gathered from an automatic weather station close to the experimental plant. From June to November 2009 and from April to November 2010, ET values were measured as the amount of water needed to restore the initial volume in the beds after a certain period. Cumulative reference evapotranspiration (ET(0)) was similar to the cumulative ET measured in the beds without vegetation (ET(con)), while the Phragmites ET (ET (phr) ) was significantly higher underlining the effect of the vegetation. The plant coefficient of P. australis (K(p)) was very high (up to 8.5 in August 2009) compared to the typical K(c) for agricultural crops suggesting that the wetland environment was subjected to strong "clothesline" and "oasis" effects. According to the FAO 56 approach, K(p) shows different patterns and values in relation to growth stages correlating significantly to stem density, plant height and total leaves. The mean Water Use Efficiency (WUE) value of P. australis was quite low, about 2.27 g L(-1), probably due to the unlimited water availability and the lack of the plant's physiological adaptations to water conservation. The results provide useful and valid information for estimating ET rates in small-scale constructed wetlands since ET is a relevant issue in arid and semiarid regions. In these areas CW feasibility for wastewater treatment and reuse should also be carefully evaluated for macrophytes in relation to their WUE values.

  3. FMC limestone double-alkali flue gas desulfurization process: Pilot plant testing: Final report

    SciTech Connect

    Troupe, J.S.; Shepley, D.C.

    1987-07-01

    This report documents pilot plant testing of a 3 MW (9500 acfm equivalent flue gas flow) FMC limestone double alkali FGD process operating on a slipstream of a commercial 420 MW boiler burning 3.5% sulfur coal. The report discusses the rationale behind EPRI's decision to participate in the testing aspects of this project, the history of the development of limestone double alkali technology, and the chemistry involved in this technology's operation. The largest part of the report is devoted to the results obtained from tests conducted during 65 days of pilot plant operation. All of the major raw and reduced operating and analytical data taken during testing are reproduced in the appendices to the report, along with quality assurance information to support the validity of the data obtained. The report discusses the test results in detail and presents technical observations regarding their implications. The FMC limestone double alkali FGD process (1) can consistently remove 92 to 93% of SO/sub 2/ from high-sulfur coal flue gas, (2) can achieve high limestone utilization and low soda ash losses, (3) produces a manageable waste filter cake, (4) is highly tolerant of upsets in limestone feed, soda ash makeup, and regeneration residence time, and (5) presents no unusual safety or environmental problems. The process, like conventional limestone scrubbing, shows some adverse effects of increasing soluble magnesium concentration on solids quality and requires a finely ground limestone feed material to achieve high limestone utilization. However, neither limestone grind nor magnesium concentration appears to affect SO/sub 2/ removal efficiency. The report suggests specific lines of future developmental work and future demonstration testing to enhance the attractiveness of this process to the electric utility industry. A bibliography of limestone double alkali literature is included. 3 refs., 25 figs., 4 tabs.

  4. Geologic mapping of the air intake shaft at the Waste Isolation Pilot Plant

    SciTech Connect

    Holt, R.M.; Powers, D.W. )

    1990-12-01

    The air intake shaft (AS) was geologically mapped from the surface to the Waste Isolation Pilot Plant (WIPP) facility horizon. The entire shaft section including the Mescalero Caliche, Gatuna Formation, Santa Rosa Formation, Dewey Lake Redbeds, Rustler Formation, and Salado Formation was geologically described. The air intake shaft (AS) at the Waste Isolation Pilot Plant (WIPP) site was constructed to provide a pathway for fresh air into the underground repository and maintain the desired pressure balances for proper underground ventilation. It was up-reamed to minimize construction-related damage to the wall rock. The upper portion of the shaft was lined with slip-formed concrete, while the lower part of the shaft, from approximately 903 ft below top of concrete at the surface, was unlined. As part of WIPP site characterization activities, the AS was geologically mapped. The shaft construction method, up-reaming, created a nearly ideal surface for geologic description. Small-scale textures usually best seen on slabbed core were easily distinguished on the shaft wall, while larger scale textures not generally revealed in core were well displayed. During the mapping, newly recognized textures were interpreted in order to refine depositional and post-depositional models of the units mapped. The objectives of the geologic mapping were to: (1) provide confirmation and documentation of strata overlying the WIPP facility horizon; (2) provide detailed information of the geologic conditions in strata critical to repository sealing and operations; (3) provide technical basis for field adjustments and modification of key and aquifer seal design, based upon the observed geology; (4) provide geological data for the selection of instrument borehole locations; (5) and characterize the geology at geomechanical instrument locations to assist in data interpretation. 40 refs., 27 figs., 1 tab.

  5. Phase 1 of the First Small Power System Experiment (engineering Experiment No. 1). Volume 5: Supporting Analyses and Trade Studies. [development and testing of a solar thermal power plant

    NASA Technical Reports Server (NTRS)

    Holl, R. J.

    1979-01-01

    The development and design of a modular solar thermal power system for application in the 1 to 10 MWe range is described. The system is used in remote utility applications, small communities, rural areas, and for industrial uses. Thermal and stress analyses are performed on the collector subsystem, energy storage subsystem, energy transport subsystem, the power conversion subsystem, and the plant control subsystem.

  6. OTEC (Ocean Thermal Energy Conversion) stationkeeping subsystems (SKSS). Review of conceptual and preliminary designs of Pilot Plant SKSS. Appendix. Recommendations for OTEC commercial plant SKSS

    SciTech Connect

    Not Available

    1980-09-15

    The aim of the study is primarily an assessment of the adequacy, accuracy, and practicality of the proposed designs, in order to make comment on the feasibility of developing a viable station-keeping subsystems (SKSS) for the OTEC Pilot Plant. Included in this report is information on: design criteria and safety factors; environmental data and response analysis; materials and components; deployment concept; maintenance and replacement concepts; concept evaluation - risk/reliability/cost; and recommendations for OTEC commercial plant station-keeping subsystems.

  7. Conceptual design of a lunar oxygen pilot plant Lunar Base Systems Study (LBSS) task 4.2

    NASA Technical Reports Server (NTRS)

    1988-01-01

    The primary objective was to develop conceptual designs of two pilot plants to produce oxygen from lunar materials. A lunar pilot plant will be used to generate engineering data necessary to support an optimum design of a larger scale production plant. Lunar oxygen would be of primary value as spacecraft propellant oxidizer. In addition, lunar oxygen would be useful for servicing nonregenerative fuel cell power systems, providing requirements for life support, and to make up oxygen losses from leakage and airlock cycling. Thirteen different lunar oxygen production methods are described. Hydrogen reduction of ilmenite and extraction of solar-wind hydrogen from bulk lunar soil were selected for conceptual design studies. Trades and sensitivity analyses were performed with these models.

  8. Balance of plant for SOFC experiences with the planning, engineering, construction and testing of a 10 kW planar SOFC pilot plant

    SciTech Connect

    Klov, K.; Sundal, P.; Monsen, T.; Vik, A.

    1996-12-31

    The Statoil Solide Oxide Fuel Cell Research Program was started in January 1991. Some results from this Program were presented to the 1994 Fuel Cell Seminar in San Diego. The final technical milestone for the program was to design, engineer, construct and test a 10 kW pilot plant. From the very beginning, the importance of coordination and integration in the development of components, subsystems and systems, combined with basic research on cell and stack performance, were established as the guidelines for the program. In this way the progress towards the final goal was not a matter of making the best individual cell, the best stack or a superior balance of plant, but to build an efficient, reliable and operative pilot plant system, and thus make a further step towards a verification of commercial SOFC system technology.

  9. Catalytic seawater flue gas desulfurization process: an experimental pilot plant study

    SciTech Connect

    F. Vidal B.; P. Ollero; F.J. Gutierrez Ortiz; A. Villanueva

    2007-10-15

    In previous articles by the authors on seawater S(IV) oxidation kinetics, a significant catalytic effect was demonstrated by means of a commercially available activated carbon. The aims of this study carried out at pilot plant scale were to assess the use of high-efficiency structured packing and to validate the positive results obtained previously in laboratory studies. A comparison between a packed tower and a spray column was made by maintaining the same desulfurization efficiency. A 47% reduction in seawater flow can be obtained with a packed tower. This option seems to be more economical, with a reduction in operation costs of least of 33%. With the appropriate activated carbon, it is possible to reach a greater oxidation rate at a low pH level than by operating conventionally at a high pH level without a catalyst. A preliminary technical and financial comparison between the advanced seawater desulfurization process (equipped with a packed tower and a catalytic oxidation plant) and the conventional process (spray tower and noncatalytic oxidation) was carried out. 18 refs., 4 figs., 4 tabs.

  10. Disinfection of model indicator organisms in a drinking water pilot plant by using PEROXONE

    SciTech Connect

    Wolfe, R.L.; Stewart, M.H.; Liang, S.; McGuire, M.J. )

    1989-09-01

    PEROXONE is an advanced oxidation process generated by combining ozone and hydrogen peroxide. This process stimulates the production of hydroxyl radicals, which have been shown to be superior to ozone for the destruction of some organic contaminants. In this study, pilot-scale experiments were conducted to evaluate the microbicidal effectiveness of PEROXONE and ozone against three model indicator groups. Escherichia coli and MS2 coliphage were seeded into the influent to the preozonation contactors of a pilot plant simulating conventional water treatment and were exposed to four ozone dosages, four hydrogen peroxide/ozone weight ratios, and four contact times in two source waters--Colorado River water and state project water--of different quality. The removal of heterotrophic plate count bacteria was also monitored. Results of the study indicated that the microbicidal activity of PEROXONE was greatly affected by the applied ozone dose, H2O2/O3 ratio, contact time, source water quality, and type of microorganism tested. At contact times of 5 min or less, ozone alone was a more potent bactericide than PEROXONE at all H2O2/O3 ratios tested. However, this decrease in the bactericidal potency of PEROXONE was dramatic only as the H2O2/O3 ratio was increased from 0.5 to 0.8. The fact that the bactericidal activity of PEROXONE generally decreased with increasing H2O2/O3 ratios was thought to be related to the lower ozone residuals produced. The viricidal activity of PEROXONE and ozone was comparable at all of the H2O2/O3 ratios. Heterotrophic plate count bacteria were the most resistant group of organisms. Greater inactivation of E. coli and MS2 was observed in Colorado River water than in state project water and appeared to result from differences in the turbidity and alkalinity of the two waters. Regardless of source water, greater than 4.5 log10 of E.

  11. Application of Several Techniques for Prohibiting Fouling in Li-Recovery Pilot Plant

    NASA Astrophysics Data System (ADS)

    Yoon, H.; Kim, D.; Gong, M.; Kim, B.; Chung, K.

    2010-12-01

    The problem of marine organisms adhering to any surfaces exposed in seawater is as old as time. Marine fouling is a major problem in the materials used in seawater worldwide. Marine coatings contain elements such as copper and triorganotin compounds were often used as an effective compound for control the fouling problem, but application of such coatings containing triorganotin compounds was prohibited and the former are considered undesirable because of its toxicity and accumulative in non-target organisms. Monitoring and field studies regarding fouling problems during operation of Li-recovery pilot plant which is designed by the Korea Institute of Geoscience & Mineral Resources (KIGAM) were major concern of this study. Fouling could be the most troublesome tasks during the development of a large scale pilot production test for achieving a high performance adsorbent for seawater dissolved Li recovery. Chemical and microbiological characteristics of the fouling biofilms developed on various surfaces in contact with the seawater were made. The microbial compositions of the biofilm consortia formed on the reservoir polymer surfaces were also tested for. The quantities of the diverse microorganisms in the biofilm samples developed on the prohibiting polymer reservoir surface were larger when there was no concern about materials for special selection for fouling. The experimental results offered new specific information, concerning the problems in the application of new material as well as surface coating such as anti-fouling coatings. They showed the important role microbial activity in fouling and corrosion of the surfaces in contact with the any seawater. Acknowledgements: This research was supported by a grant from the Development of Technology for Extraction of Resources Dissolved in Sea Water Program funded by Ministry of Land Transport and Maritime Affairs in Korean Government (2010).

  12. Extraction of microalgae derived lipids with supercritical carbon dioxide in an industrial relevant pilot plant.

    PubMed

    Lorenzen, Jan; Igl, Nadine; Tippelt, Marlene; Stege, Andrea; Qoura, Farah; Sohling, Ulrich; Brück, Thomas

    2017-03-15

    Microalgae are capable of producing up to 70% w/w triglycerides with respect to their dry cell weight. Since microalgae utilize the greenhouse gas CO2, they can be cultivated on marginal lands and grow up to ten times faster than terrestrial plants, the generation of algae oils is a promising option for the development of sustainable bioprocesses, that are of interest for the chemical lubricant, cosmetic and food industry. For the first time we have carried out the optimization of supercritical carbon dioxide (SCCO2) mediated lipid extraction from biomass of the microalgae Scenedesmus obliquus and Scenedesmus obtusiusculus under industrrially relevant conditions. All experiments were carried out in an industrial pilot plant setting, according to current ATEX directives, with batch sizes up to 1.3 kg. Different combinations of pressure (7-80 MPa), temperature (20-200 °C) and CO2 to biomass ratio (20-200) have been tested on the dried biomass. The most efficient conditions were found to be 12 MPa pressure, a temperature of 20 °C and a CO2 to biomass ratio of 100, resulting in a high extraction efficiency of up to 92%. Since the optimized CO2 extraction still yields a crude triglyceride product that contains various algae derived contaminants, such as chlorophyll and carotenoids, a very effective and scalable purification procedure, based on cost efficient bentonite based adsorbers, was devised. In addition to the sequential extraction and purification procedure, we present a consolidated online-bleaching procedure for algae derived oils that is realized within the supercritical CO2 extraction plant.

  13. Performance analysis and pilot plant test results for the Komorany fluidized bed retrofit project

    SciTech Connect

    Snow, G.C.

    1995-12-01

    Detailed heat and mass balance calculations and emission performance projections are presented for an atmospheric fluidized bed boiler bottom retrofit at the 927 MWt (steam output) Komorany power station and district heating plant in the Czech Republic. Each of the ten existing boilers are traveling grate stoker units firing a local, low-rank brown coal. This fuel, considered to be representative of much of the coal deposits in Central Europe, is characterized by an average gross calorific value of 10.5 MJ/kg (4,530 Btu/lb), an average dry basis ash content of 47 %, and a maximum dry basis sulfur content of 1.8 % (3.4 % on a dry, ash free basis). The same fuel supply, together with limestone supplied from the region will be utilized in the retrofit fluidized bed boilers. The primary objectives of this retrofit program are, (1) reduce emissions to a level at or below the new Czech Clean Air Act, and (2) restore plant capacity to the original specification. As a result of the AFBC retrofit and plant upgrade, the particulate matter emissions will be reduced by over 98 percent, SO{sub 2} emissions will be reduced by 88 percent, and NO{sub x} emissions will be reduced by 38 percent compared to the present grate-fired configuration. The decrease in SO{sub 2} emissions resulting from the fluidized bed retrofit was initially predicted based on fuel sulfur content, including the distribution among organic, pyritic, and sulfate forms; the ash alkalinity; and the estimated limestone calcium utilization efficiency. The methodology and the results of this prediction were confirmed and extended by pilot scale combustion trials at a 1.0 MWt (fuel input), variable configuration test facility in France.

  14. Waste Isolation Pilot Plant. Ecosystem studies at the Los Medanos Site Eddy County, New Mexico. Volume I of III

    SciTech Connect

    Braswell, J.; Hart, J.S.

    1982-03-01

    This document summarizes the results of biological studies conducted at the Los Medanos site in southeastern New Mexico during 1981. Complete study reports prepared by the principal investigators are included as an appendix to this document. Biological studies have been underway at the Los Medanos site since 1975; this work constitutes a portion of the site characterization effort the US Department of energy (DOE) is pursuing in preparation for the development of the Waste Isolation Pilot Plant (WIPP). WIPP is to be a research and development facility to demonstrate the safe disposal of radioactive waste material produced through national defense activities. The appendix contains the following: Avifauna Baseline Studies at the Los Medanos Site, Southeastern New Mexico; Aquatic Ecosystems of the Lower Pecos Drainage in New Mexico; Floristic Studies at the Los Medanos Site; Los Medanos Project - Soil Studies; Arthropod and Decomposition Studies at the WIPP Site; Ecology of Amphibians, Reptiles, and Mammals at the Los Medanos Waste Isolation Pilot Plant (WIPP) Project Area of New Mexico; Vertebrate Ecology at the Los Medanos Waste Isolation Pilot Plant, New Mexico; and Statistical Evaluation of Plant Density Data Collected at the Los Medanos Site, New Mexico (1978-1980).

  15. Production characteristics of lettuce Lactuca sativa L. in the frame of the first crop tests in the Higher Plant Chamber integrated into the MELiSSA Pilot Plant

    NASA Astrophysics Data System (ADS)

    Tikhomirova, Natalia; Lawson, Jamie; Stasiak, Michael; Dixon, Mike; Paille, Christel; Peiro, Enrique; Fossen, Arnaud; Godia, Francesc

    Micro-Ecological Life Support System Alternative (MELiSSA) is an artificial closed ecosystem that is considered a tool for the development of a bioregenerative life support system for manned space missions. One of the five compartments of MELiSSA loop -Higher Plant Chamber was recently integrated into the MELiSSA Pilot Plant facility at Universitat Aut`noma deo Barcelona. The main contributions expected by integration of this photosynthetic compartment are oxygen, water, vegetable food production and CO2 consumption. Production characteristics of Lactuca sativa L., as a MELiSSA candidate crop, were investigated in this work in the first crop experiments in the MELiSSA Pilot Plant facility. The plants were grown in batch culture and totaled 100 plants with a growing area 5 m long and 1 m wide in a sealed controlled environment. Several replicates of the experiments were carried out with varying duration. It was shown that after 46 days of lettuce cultivation dry edible biomass averaged 27, 2 g per plant. However accumulation of oxygen in the chamber, which required purging of the chamber, and decrease in the food value of the plants was observed. Reducing the duration of the tests allowed uninterrupted test without opening the system and also allowed estimation of the crop's carbon balance. Results of productivity, tissue composition, nutrient uptake and canopy photosynthesis of lettuce regardless of test duration are discussed in the paper.

  16. Comparison of carbon balance in Mediterranean pilot constructed wetlands vegetated with different C4 plant species.

    PubMed

    Barbera, Antonio C; Borin, Maurizio; Cirelli, Giuseppe L; Toscano, Attilio; Maucieri, Carmelo

    2015-02-01

    This study investigates carbon dioxide (CO2) and methane (CH4) emissions and carbon (C) budgets in a horizontal subsurface flow pilot-plant constructed wetland (CW) with beds vegetated with Cyperus papyrus L., Chrysopogon zizanioides (L.) Roberty, and Mischantus × giganteus Greef et Deu in the Mediterranean basin (Sicily) during the 1st year of plant growing season. At the end of the vegetative season, M. giganteus showed the higher biomass accumulation (7.4 kg m(-2)) followed by C. zizanioides (5.3 kg m(-2)) and C. papyrus (1.8 kg m(-2)). Significantly higher emissions of CO2 were detected in the summer, while CH4 emissions were maximum during spring. Cumulative CO2 emissions by C. papyrus and C. zizanioides during the monitoring period showed similar trends with final values of about 775 and 1,074 g m(-2), respectively, whereas M. giganteus emitted 3,395 g m(-2). Cumulative CH4 bed emission showed different trends for the three C4 plant species in which total gas release during the study period was for C. papyrus 12.0 g m(-2) and ten times higher for M. giganteus, while C. zizanioides bed showed the greatest CH4 cumulative emission with 240.3 g m(-2). The wastewater organic carbon abatement determined different C flux in the atmosphere. Gas fluxes were influenced both by plant species and monitored months with an average C-emitted-to-C-removed ratio for C. zizanioides, C. papyrus, and M. giganteus of 0.3, 0.5, and 0.9, respectively. The growing season C balances were positive for all vegetated beds with the highest C sequestered in the bed with M. giganteus (4.26 kg m(-2)) followed by C. zizanioides (3.78 kg m(-2)) and C. papyrus (1.89 kg m(-2)). To our knowledge, this is the first paper that presents preliminary results on CO2 and CH4 emissions from CWs vegetated with C4 plant species in Mediterranean basin during vegetative growth.

  17. A Practical Approach for Studying Fouling Process in Li-Recovery Pilot Plant

    NASA Astrophysics Data System (ADS)

    Kong, M.; Yoon, H.; Eom, C.; Kim, B.; Chung, K.

    2011-12-01

    The efficiency of selective ion recovery such as lithium from seawater has been major interest of previous studies. However, the characterization of adsorption behavior as well as dissolution yield as discharging environmentally problematic chemical species must carefully studied in various conditions including different seawater conditions [1]. Marine biofouling communities are complex, highly dynamic ecosystems consisting of a diverse range of organisms. The development of such communities begins with bacterial attachment followed by the colonization of higher organisms such as invertebrate larvae and algal spores [2-3]. Monitoring and field studies regarding fouling problems during operation of Li-recovery pilot plant which is designed by the Korea Institute of Geoscience & Mineral Resources (KIGAM) were major concern of this study. We examined fouling process for the duration of exposure time in real marine environment. Substrated with no-antifouling treated material and antifouling treated material were exposed and tested for different behaviors toward fouling in ocean. SEM-EDS (Scanning Electron Microscope-Energy dispersive Spectroscopy) analysis was done for surface identification of specific elements for possible dissolution during seawater exposure. To identify organic compound was used GC-MS (Gas Chromatography Mass Spectrometer) analysis. Experiment results, organisms such as alga are fouled the most on 30 days and antitreated material is fouled less than non antitreated material. Operating Li-recovery pilot plant to sea, we need to consider in order to effectively and economically resolve the fouling problem. Acknowledgement : This research was supported by the national research project titled "The Development of Technology for Extraction of Resources Dissolved in Seawater" of the Korea Institute of Geoscience and Mineral Resources (KIGAM) funded by the Ministry of Land, Transport and Maritime Affairs. References [1] M. Y. Diego, K. Soren, and D. J. Kim

  18. A pilot study of workplace dermal exposures to cypermethrin at a chemical manufacturing plant.

    PubMed

    Buckley, Timothy J; Geer, Laura A; Connor, Thomas H; Robertson, Shirley; Sammons, Deborah; Smith, Jerome; Snawder, John; Boeniger, Mark

    2011-10-01

    Exposure during the manufacture of pesticides is of particular concern due to their toxicity and because little is known about worker exposure, since most studies have focused on end-use application within agriculture or buildings. Even though dermal exposure can be expected to dominate for pesticides, little is known about workplace dermal exposures or even appropriate methods for their assessment. The current study begins to address this gap by evaluating alternative methods for assessing dermal exposure at a chemical manufacturing plant. For this pilot study, eight workers were recruited from a U.S. plant that produced the pesticide cypermethrin. Exposure was evaluated using three approaches: (1) survey assessment (questionnaire), (2) biological monitoring, and (3) workplace environmental sampling including ancillary measurements of glove contamination (interior and exterior). In each case, cypermethrin was quantified by enzyme-linked immunosorbent assay (ELISA). Environmental measurements identified two potential pathways of cypermethrin exposure: glove and surface contamination. Workplace exposure was also indicated by urine levels (specific gravity adjusted) of the parent compound, which ranged from 35 to 253 μg/L (median of 121 μg/L) with no clear trend in levels from pre- to post-shift. An exploratory analysis intended to guide future studies revealed a positive predictive association (Spearman correlation, p ≤ 0.10) between post-shift urine concentrations and a subset of survey questions evaluating worker knowledge, attitudes, and perceptions (KAP) of workplace dermal hazards, i.e., personal protective equipment self-efficacy, and inverse associations with behavior belief and information belief scales. These findings are valuable in demonstrating a variety of dermal exposure methods (i.e., behavioral attributes, external contamination, and biomarker) showing feasibility and providing measurement ranges and preliminary associations to support future and

  19. Guest editorial: The 1996 performance assessment for the Waste Isolation Pilot Plant

    SciTech Connect

    HELTON,JON CRAIG; MARIETTA,MELVIN G.

    2000-05-19

    The appropriate disposal of radioactive waste is a problem of great importance, wide-spread interest, and some controversy. As part of the solution to this problem the Waste Isolation Pilot Plant (WIPP) is under development by the US Department of Energy (DOE) for the deep geologic disposal of transuranic (TRU) waste generated by defense programs in the United States. The DOE submitted a Compliance Certification Application (CCA){sup 17} for the WIPP to the US Environmental Protection Agency (EPA) in October 1996, and a positive certification decision for the WIPP was issued by the EPA in May 1998. The first disposal of TRU waste in the WIPP took place in March 1999. The 1996 CCA for the WIPP was supported by an extensive performance assessment (PA) carried out by Sandia National Laboratories (SNL), with this PA often designated the 1996 WIPP PA, the 1996 CCA PA, or simply the 1996 PA. In turn, the 1996 PA was supported by site characterization activities, experimental programs, model development programs, data development programs, uncertainty and sensitivity analyses, a dedicated computational environment, a rigorous quality assurance (QA) program and a sequence of earlier PAs. Further, this PA was carried out in a regulatory environment defined by the following EPA regulations: Environmental Radiation Protection Standards for the Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes (40 CFR Part 191) and Criteria for the Certification and Re-Certification of the Waste Isolation Pilot Plant's Compliance with the 40 CFR Part 191 Disposal Regulations (40 CFR Part 194) The WIPP is the first licensed facility in the United States for the deep geologic disposal of radioactive waste. As a result, there is extensive interest in both the WIPP and the analyses that led to its certification by the EPA for the disposal of TRU waste. The WIPP program has produced large amounts of documentation both as part of the CCA itself and in large

  20. Evaluation of the U.S. Environmental Protection Agency's Public Outreach Program during the Certification Process at the Waste Isolation Pilot Plant in New Mexico

    EPA Pesticide Factsheets

    The EPA Office of Radiation and Indoor Air (ORIA) contracted with Phoenix Environmental and EnviroIssues to evaluate the effectiveness of its public outreach program during its certification of the Waste Isolation Pilot Plant (WIPP) in Carlsbad, NM.

  1. Initial Assessment of Sulfur-Iodine Process Safety Issues and How They May Affect Pilot Plant Design and Operation

    SciTech Connect

    Robert S. Cherry

    2006-09-01

    The sulfur-iodine process to make hydrogen by the thermochemical splitting of water is under active development as part of a U.S. Department of Energy program. An integrated lab scale system is currently being designed and built. The next planned stage of development is a pilot plant with a thermal input of about 500 kW, equivalent to about 30,000 standard liters per hour of hydrogen production. The sulfur-iodine process contains a variety of hazards, including temperatures up to 850 ºC and hazardous chemical species including SO2, H2SO4, HI, I2, and of course H2. The siting and design of a pilot plant must consider these and other hazards. This report presents an initial analysis of the hazards that might affect pilot plant design and should be considered in the initial planning. The general hazards that have been identified include reactivity, flammability, toxicity, pressure, electrical hazards, and industrial hazards such as lifting and rotating equipment. Personnel exposure to these hazards could occur during normal operations, which includes not only running the process at the design conditions but also initial inventory loading, heatup, startup, shutdown, and system flushing before equipment maintenance. Because of the complexity and severity of the process, these ancillary operations are expected to be performed frequently. In addition, personnel could be exposed to the hazards during various abnormal situations which could include unplanned phase changes of liquids or solids, leaks of process fluids or cooling water into other process streams, unintentional introducion of foreign species into the process, and unexpected side reactions. Design of a pilot plant will also be affected by various codes and regulations such as the International Building Code, the International Fire Code, various National Fire Protection Association Codes, and the Emergency Planning and Community Right-to-Know Act.

  2. Resource Conservation and Recovery Act Part B permit application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 6, Revision 3

    SciTech Connect

    Not Available

    1993-03-01

    This volume contains Appendix D2, engineering design basis reports. Contents include: Design considerations for the waste hoist of the Waste Isolation Pilot Plant (WIPP); A site-specific study of wind and tornado probabilities at the WIPP Site in southeast New Mexico; Seismic evaluation report of underground facilities; and calculations for analysis of wind loads and tornado loads for WHB, seismic calculations, calculations for VOC-10 monitoring system, and for shaft at station A.

  3. Waste Isolation Pilot Plant site environmental report, for calendar year 1995

    SciTech Connect

    1996-09-01

    The U.S. Department of Energy (DOE) Order 5400.1 General Environmental Protection Program, requires DOE facilities, that conduct environmental protection programs, to annually prepare a Site Environmental Report (SER). The purpose of the SER is to provide an abstract of environmental assessments conducted in order to characterize site environmental management performance, to confirm compliance with environmental standards and requirements, and to highlight significant programs and efforts of environmental merit. The content of this SER is not restricted to a synopsis of the required data, in addition, information pertaining to new and continued monitoring and compliance activities during the 1995 calendar year are also included. Data contained in this report are derived from those monitoring programs directed by the Waste Isolation Pilot Plant (WIPP) Environmental Monitoring Plan (EMP). The EMP provides inclusive guidelines implemented to detect potential impacts to the environment and to establish baseline measurements for future environmental evaluations. Surface water, groundwater. air, soil, and biotic matrices are monitored for an array of radiological and nonradiological factors. The baseline radiological surveillance program encompasses a broader geographic area that includes nearby ranches, villages, and cities. Most elements of nonradiological assessments are conducted within the geographic vicinity of the WIPP site.

  4. Mini-pilot plant research and demonstration on liquid phase methanol and dimethyl ether synthesis

    SciTech Connect

    Vijayaraghavan, P.; Lee, S.; Kulik, C.J.

    1994-12-31

    A laboratory scale mini-pilot plant was designed, built, and operated to study the liquid phase methanol synthesis (LPMeOH{trademark}) process and the liquid phase dimethyl ether (LPDME) process in a mechanically agitated slurry reactor system, where syngas reacts in the presence of the catalyst-oil slurry which is being agitated by an impeller. A liquid phase process for the synthesis of methanol from syngas over a catalyst (Cu/ZnO/Al{sub 2}O{sub 3}), has been developed. Process feasibility, kinetics, mass transfer, and thermodynamics of the LPMeOH process were investigated. The liquid phase methanol synthesis is a chemical equilibrium limited process. The productivity of methanol can be increased by successfully alleviating this chemical equilibrium limitation. A dual catalytic liquid phase process was developed, which coproduces dimethyl ether with methanol from syngas, over a hybrid catalytic system comprising of the methanol synthesis catalyst and the methanol dehydration catalyst ({gamma}-alumina). The process feasibility analysis that proves the alleviation of the equilibrium limitation will be presented. Comparisons between the hydrogenation extent, reactor productivity and syngas conversions, which are all higher in the LPDME process than in the LPMeOH process, will be presented.

  5. Zero Discharge Performance of an Industrial Pilot-Scale Plant Treating Palm Oil Mill Effluent

    PubMed Central

    Mahmood, Qaisar; Qiu, Jiang-Ping; Li, Yin-Sheng; Chang, Yoon-Seong; Chi, Li-Na; Li, Xu-Dong

    2015-01-01

    Palm oil is one of the most important agroindustries in Malaysia. Huge quantities of palm oil mill effluent (POME) pose a great threat to aqueous environment due to its very high COD. To make full use of discharged wastes, the integrated “zero discharge” pilot-scale industrial plant comprising “pretreatment-anaerobic and aerobic process-membrane separation” was continuously operated for 1 year. After pretreatment in the oil separator tank, 55.6% of waste oil in raw POME could be recovered and sold and anaerobically digested through 2 AnaEG reactors followed by a dissolved air flotation (DAF); average COD reduced to about 3587 mg/L, and biogas production was 27.65 times POME injection which was used to generate electricity. The aerobic effluent was settled for 3 h or/and treated in MBR which could remove BOD3 (30°C) to less than 20 mg/L as required by Department of Environment of Malaysia. After filtration by UF and RO membrane, all organic compounds and most of the salts were removed; RO permeate could be reused as the boiler feed water. RO concentrate combined with anaerobic surplus sludge could be used as biofertilizer. PMID:25685798

  6. Incorporating long-term climate change in performance assessment for the Waste Isolation Pilot Plant

    SciTech Connect

    Swift, P.N.; Baker, B.L.; Economy, K.; Garner, J.W.; Helton, J.C.; Rudeen, D.K.

    1993-09-18

    The United States Department of Energy (DOE) is developing the Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico for the disposal of transuranic wastes generated by defense programs. Applicable regulations (40 CFR 191) require the DOE to evaluate disposal-system performance for 10,000 yr. Climatic changes may affect performance by altering groundwater flow. Paleoclimatic data from southeastern New Mexico and the surrounding area indicate that the wettest and coolest Quaternary climate at the site can be represented by that at the last glacial maximum, when mean annual precipitation was approximately twice that of the present. The hottest and driest climates have been similar to that of the present. The regularity of global glacial cycles during the late Pleistocene confirms that the climate of the last glacial maximum is suitable for use as a cooler and wetter bound for variability during the next 10,000 yr. Climate variability is incorporated into groundwater-flow modeling for WIPP PA by causing hydraulic head in a portion of the model-domain boundary to rise to the ground surface with hypothetical increases in precipitation during the next 10,000 yr. Variability in modeled disposal-system performance introduced by allowing head values to vary over this range is insignificant compared to variability resulting from other causes, including incomplete understanding of transport processes. Preliminary performance assessments suggest that climate variability will not affect regulatory compliance.

  7. Basic data report for drillholes at the H-11 complex (Waste Isolation Pilot Plant-WIPP)

    SciTech Connect

    Mercer, J.W. ); Snyder, R.P. )

    1990-05-01

    Drillholes H-11b1, H-11b2, and H-11b3 were drilled from August to December 1983 for site characterization and hydrologic studies of the Culebra Dolomite Member of the Upper Permian Rustler Formation at the Waste Isolation Pilot Plant (WIPP) site in southeastern New Mexico. In October 1984, the three wells were subjected to a series of pumping tests designed to develop the wells, provide information on hydraulic communication between the wells, provide hydraulic properties information, and to obtain water samples for quality of water measurements. Based on these tests, it was determined that this location would provide an excellent pad to conduct a convergent-flow non-sorbing tracer test in the Culebra dolomite. In 1988, a fourth hole (H-11b4) was drilled at this complex to provide a tracer-injection hole for the H-11 convergent-flow tracer test and to provide an additional point at which the hydraulic response of the Culebra H-11 multipad pumping test could be monitored. A suite of geophysical logs was run on the drillholes and was used to identify different lithologies and aided in interpretation of the hydraulic tests. 4 refs., 6 figs., 6 tabs.

  8. Use of zeolitised coal fly ash for landfill leachate treatment: a pilot plant study.

    PubMed

    Luna, Y; Otal, E; Vilches, L F; Vale, J; Querol, X; Fernández Pereira, C

    2007-01-01

    Treatment of municipal solid waste (MSW) landfill leachate generally results in low percentages of nutrient removal due to the high concentration and accumulation of refractory compounds. For this reason, individual physical, chemical and biological processes have been used for the treatment of raw landfill leachate and sometimes for the mixture of domestic wastewater and landfill leachate. In this work, the possibility of treating landfill leachate was tested in a bench-scale pilot plant by a two-step method combining adsorption and coagulation-flocculation. Zeolite synthesized from coal fly ash, a by-product of coal-fired power stations, was used in this study both as a decantation aid reagent and as an adsorbent of COD and NH4-N. The coagulation-flocculation step was performed by the use of aluminium sulphate and a polyelectrolyte (ACTIPOL A-401). The leachate was collected directly from a storage unit of the organic fraction of MSW, before it was composted. For this reason the raw leachate was diluted before treatment. The sludge was recirculated to enhance the removal efficiency of nutrients as well as to optimize flocculant saving and to decrease sludge production. The results showed that it is possible to remove 43%, 53% and 82% of COD, NH4-N, and suspended solids, respectively. Therefore, this method may be an alternative for ammonium removal, as well as a suitable pre- or post-treatment step, in combination with other processes in order to meet regulatory limits.

  9. The Geologic and Hydrogeologic Setting of the Waste Isolation Pilot Plant

    SciTech Connect

    Swift, P.N.; Corbet, T.F.

    1999-03-04

    The Waste Isolation Pilot Plant (WIPP) is a mined repository constructed by the US Department of Energy for the permanent disposal of transuranic wastes generated since 1970 by activities related to national defense. The WIPP is located 42 km east of Carlsbad, New Mexico, in bedded salt (primarily halite) of the Late Permian (approximately 255 million years old) Salado Formation 655 m below the land surface. Characterization of the site began in the mid-1970s. Construction of the underground disposal facilities began in the early 1980s, and the facility received final certification from the US Environmental Protection Agency in May 1998. Disposal operations are planned to begin following receipt of a final permit from the State of New Mexico and resolution of legal issues. Like other proposed geologic repositories for radioactive waste, the WIPP relies on a combination of engineered and natural barriers to isolate the waste from the biosphere. Engineered barriers at the WIPP, including the seals that will be emplaced in the access shafts when the facility is decommissioned, are discussed in the context of facility design elsewhere in this volume. Physical properties of the natural barriers that contribute to the isolation of radionuclides are discussed here in the context of the physiographic, geologic, and hydrogeologic setting of the site.

  10. Historical Background on Assessment the Performance of the Waste Isolation Pilot Plant

    SciTech Connect

    Rechard, R.P.

    1999-06-01

    In 1979, six years after selecting the Delaware Basin as a potential disposal area, Congress authorized the US Department of Energy to build the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico, as a research and development facility for the safe management, storage, and disposal of waste contaminated with transuranic radioisotopes. In 1998, 19 years after authorization and 25 years after site selection, the US Environmental Protection Agency (EPA) certified that the WIPP disposal system complied with its regulations. The EPA's decision was primarily based on the results from a performance assessment conducted in 1996. This performance assessment was the culmination of four preliminary performance assessments conducted between 1989 and 1992. This report provides a historical setting and context for how the performance of the deep geologic repository at the WIPP was analyzed. Also included is background on political forces acting on the project. For example, the federal requirement to provide environmental impact statements and negotiated agreements with the State of New Mexico influenced the type of scientific areas that were investigated and the engineering analysis prior to 1989 for the WIPP.

  11. Incorporating long-term climate change in performance assessment for the Waste Isolation Pilot Plant

    SciTech Connect

    Swift, P.N.; Baker, B.L.; Economy, K.; Garner, J.W.; Helton, J.C.; Rudeen, D.K.

    1994-03-01

    The United States Department of Energy (DOE) is developing the Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico for the disposal of transuranic wastes generated by defense programs. Applicable regulations (40 CFR 191) require the DOE to evaluate disposal-system performance for 10,000 yr. Climatic changes may affect performance by altering groundwater flow. Paleoclimatic data from southeastern New Mexico and the surrounding area indicate that the wettest and coolest Quaternary climate at the site can be represented by that at the last glacial maximum, when mean annual precipitation was approximately twice that of the present. The hottest and driest climates have been similar to that of the present. The regularity of global glacial cycles during the late Pleistocene confirms that the climate of the last glacial maximum is suitable for use as a cooler and wetter bound for variability during the next 10,000 yr. Climate variability is incorporated into groundwater-flow modeling for WIPP PA by causing hydraulic head in a portion of the model-domain boundary to rise to the ground surface with hypothetical increases in precipitation during the next 10,000 yr. Variability in modeled disposal-system performance introduced by allowing had values to vary over this range is insignificant compared to variability resulting from other causes, including incomplete understanding of transport processes. Preliminary performance assessments suggest that climate variability will not affect regulatory compliance.

  12. Examples of technical innovations in rock property measurements prompted by the Waste Isolation Pilot Plant

    SciTech Connect

    Christian-Frear, T.L.

    1997-06-01

    The Waste Isolation Pilot Plant (WIPP) is the U.S. Department of Energy`s (DOE) planned repository for transuranic waste generated by defense programs. The WIPP repository 660 meters underground in bedded salt. Bedded salt was chosen for the repository because of salt`s small moisture content, extremely low permeability, and its natural ability to flow or creep, effectively encapsulating the waste in the long-term. However, because of these unique characteristics, the ability to measure properties at in situ conditions are beyond the realm of most standard experimental equipment. Thus a suite of new experimental systems and techniques has been developed to measure properties in extremely {open_quotes}tight{close_quotes} (low permeability) rocks. Also, innovations in rock property measurements have been made for standard porous media through the research conducted to characterize the rocks above the repository. A number of the new systems and techniques developed through the WIPP are presented in this paper. Examples include permeameters, two-phase flow characterization equipment, techniques for evaluation of salt healing, and characterization of diffusive processes.

  13. Creep tests on clean and argillaceous salt from the Waste Isolation Pilot Plant

    SciTech Connect

    Mellegard, K.D.; Pfeifle, T.W.

    1993-05-01

    Fifteen triaxial compression creep tests were performed on clean and argillaceous salt from the Waste Isolation Pilot Plant (WIPP). The temperatures in the tests were either 25{degrees}C or 100{degrees}C while the stress difference ranged from 3.5 MPa to 21.0 MPa. In all tests, the confining pressure was 15 MPa. Test duration ranged from 23 to 613 days with an average duration of 300 days. The results of the creep tests supplemented earlier testing and were used to estimate two parameters in the Modified Munson-Dawson constitutive law for the creep behavior of salt. The two parameters determined from each test were the steady-state strain rate and the transient strain limit. These estimates were combined with parameter estimates determined from previous testing to study the dependence of both transient and steady-state creep deformation on stress difference. The exponents on stress difference determined in this study were found to be consistent with revised estimates of the exponents reported by other investigators.

  14. Characterization of airborne particles at a high-btu coal-gasification pilot plant.

    PubMed

    Davidson, C I; Santhanam, S; Stetter, J R; Flotard, R D; Gebert, E

    1982-12-01

    Airborne particles in fugitive emissions have been measured at a slagging fixed-bed coal-gasification pilot plant using lignite. Sampling was conducted during shutdown operations and opening of the gasifier following an aborted startup. Aerosol collected with a Sierra high-volume impactor was subjected to analysis by gas chromatography, mass spectrometry, and scanning electron microscopy; aerosol collected with an Andersen low-volume impactor was subjected to flameless atomic absorption analysis. The data show that the bulk of the trace organic material is associated with small particles: these data are similar to data on ambient air reported in the literature. Particle morphologies resemble those of fly ash from coal combustion, including smooth spheres, vesicular spheres, and crystalline material. Trace element size distributions are bimodal and resemble data for ambient air. Pb-containing particles are generally submicron, while particles containing Al, Fe, and other crustal species are mostly of supermicron size. Aluminum-based aerosol enrichment factors calculated from the lignite composition show that the composition of the aerosol resembles that of the coal, with the exception of modest enrichments of Mg, Na, As, and Pb in the submicron size range. Aerosol enrichment factors based on the earth's crustal composition are somewhat greater than those based on coal composition for several elements, suggesting potential errors in using crustal enrichment data to investigate chemical fractionation during aerosol formation.

  15. Air monitoring for volatile organic compounds at the Pilot Plant Complex, Aberdeen Proving Ground, Maryland

    SciTech Connect

    Schneider, J.F.; O`Neill, H.J.; Raphaelian, L.A.; Tomczyk, N.A.; Sytsma, L.F.; Cohut, V.J.; Cobo, H.A.; O`Reilly, D.P.; Zimmerman, R.E.

    1995-03-01

    The US Army`s Aberdeen Proving Ground has been a test site for a variety of munitions, including chemical warfare agents (CWA). The Pilot Plant Complex (PPC) at Aberdeen was the site of development, manufacture, storage, and disposal of CWA. Deterioration of the buildings and violations of environmental laws led to closure of the complex in 1986. Since that time, all equipment, piping, and conduit in the buildings have been removed. The buildings have been declared free of surface CWA contamination as a result of air sampling using the military system. However, no air sampling has been done to determine if other hazardous volatile organic compounds are present in the PPC, although a wide range of toxic and/or hazardous materials other than CWA was used in the PPC. The assumption has been that the air in the PPC is not hazardous. The purpose of this air-monitoring study was to screen the indoor air in the PPC to confirm the assumption that the air does not contain volatile organic contaminants at levels that would endanger persons in the buildings. A secondary purpose was to identify any potential sources of volatile organic contaminants that need to be monitored in subsequent sampling efforts.

  16. Preliminary performance assessment for the Waste Isolation Pilot Plant, December 1992. Volume 2, Technical basis

    SciTech Connect

    Not Available

    1992-12-01

    Before disposing of transuranic radioactive waste in the Waste Isolation Pilot Plant (WIPP), the United States Department of Energy (DOE) must evaluate compliance with applicable long-term regulations of the United States Environmental Protection Agency (EPA). Sandia National Laboratories is conducting iterative performance assessments (PAs) of the WIPP for the DOE to provide interim guidance while preparing for a final compliance evaluation. This volume, Volume 2, contains the technical basis for the 1992 PA. Specifically, it describes the conceptual basis for consequence modeling and the PA methodology, including the selection of scenarios for analysis, the determination of scenario probabilities, and the estimation of scenario consequences using a Monte Carlo technique and a linked system of computational models. Additional information about the 1992 PA is provided in other volumes. Volume I contains an overview of WIPP PA and results of a preliminary comparison with the long-term requirements of the EPA`s Environmental Protection Standards for Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes (40 CFR 191, Subpart B). Volume 3 contains the reference data base and values for input parameters used in consequence and probability modeling. Volume 4 contains uncertainty and sensitivity analyses related to the preliminary comparison with 40 CFR 191B. Volume 5 contains uncertainty and sensitivity analyses of gas and brine migration for undisturbed performance. Finally, guidance derived from the entire 1992 PA is presented in Volume 6.

  17. Test Results and Comparison of Triaxial Strength Testing of Waste Isolation Pilot Plant Clean Salt

    SciTech Connect

    Buchholz, Stuart A.

    2016-12-01

    This memorandum documents laboratory thermomechanical triaxial strength testing of Waste Isolation Pilot Plant (WIPP) clean salt. The limited study completed independent, adjunct laboratory tests in the United States to assist in validating similar testing results being provided by the German facilities. The testing protocol consisted of completing confined triaxial, constant strain rate strength tests of intact WIPP clean salt at temperatures of 25°C and 100°C and at multiple confining pressures. The stratigraphy at WIPP also includes salt that has been labeled “argillaceous.” The much larger test matrix conducted in Germany included both the so-called clean and argillaceous salts. When combined, the total database of laboratory results will be used to develop input parameters for models, assess adequacy of existing models, and predict material behavior. These laboratory studies are also consistent with the goals of the international salt repository research program. The goal of this study was to complete a subset of a test matrix on clean salt from the WIPP undertaken by German research groups. The work was performed at RESPEC in Rapid City, South Dakota. A rigorous Quality Assurance protocol was applied, such that corroboration provides the potential of qualifying all of the test data gathered by German research groups.

  18. Results from simulated remote-handled transuranic waste experiments at the Waste Isolation Pilot Plant (WIPP)

    SciTech Connect

    Molecke, M A

    1992-01-01

    Multi-year, simulated remote-handled transuranic waste (RH TRU, nonradioactive) experiments are being conducted underground in the Waste Isolation Pilot-Plant (WIPP) facility. These experiments involve the near-reference (thermal and geometrical) testing of eight full size RH TRU test containers emplaced into horizontal, unlined rock salt boreholes. Half of the test emplacements are partially filled with bentonite/silica-sand backfill material. All test containers were electrically heated at about 115 W/each for three years, then raised to about 300 W/each for the remaining time. Each test borehole was instrumented with a selection of remote-reading thermocouples, pressure gages, borehole vertical-closure gages, and vertical and horizontal borehole-diameter closure gages. Each test emplacements was also periodically opened for visual inspections of brine intrusions and any interactions with waste package materials, materials sampling, manual closure measurements, and observations of borehole changes. Effects of heat on borehole closure rates and near-field materials (metals, backfill, rock salt, and intruding brine) interactions were closely monitored as a function of time. This paper summarizes results for the first five years of in situ test operation with supporting instrumentation and laboratory data and interpretations. Some details of RH TRU waste package materials, designs, and assorted underground test observations are also discussed. Based on the results, the tested RH TRU waste packages, materials, and emplacement geometry in unlined salt boreholes appear to be quite adequate for initial WIPP repository-phase operations.

  19. Summary discussion of the 1996 performance assessment for the Waste Isolation Pilot Plant

    SciTech Connect

    HELTON,JON CRAIG; ANDERSON,D. RICHARD; BASABILVAZO,G.; JOW,HONG-NIAN; MARIETTA,MELVIN G.

    2000-05-19

    The Waste Isolation Pilot Plant (WIPP) is under development by the US Department of Energy (DOE) for the geologic disposal of transuranic waste. The construction of complementary cumulative distribution functions (CCDFs) for total radionuclide release from the WIPP to the accessible environment is described. The resultant CCDFs (1) combine releases due to cuttings and cavings, spallings, direct brine release, and long-term transport in flowing groundwater, (2) fall substantially to the left of the boundary line specified by the U.S. Environmental Protection Agency's (EPA's) standard 40 CFR 191 for the geologic disposal of radioactive waste, and (3) constitute an important component of the DOE's successful Compliance Certification Application to the EPA for the WIPP. Insights and perspectives gained in the performance assessment (PA) that led to these CCDFs are described, including the importance of (1) an iterative approach to PA, (2) uncertainty and sensitivity analysis, (3) a clear conceptual model for the analysis, (4) the separation of stochastic (i.e., aleatory) and subjective (i.e., epistemic) uncertainty, (5) quality assurance procedures, (6) early involvement of peer reviewers, regulators, and stake holders, (7) avoidance of conservative assumptions, and (8) adequate documentation.

  20. Potential for long-term isolation by the Waste Isolation Pilot Plant disposal system

    SciTech Connect

    Bertram-Howery, S.G. ); Swift, P.N. )

    1990-06-01

    The US Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP) must comply with EPA regulation 40 CFR Part 191, Subpart B, which sets environmental standards for radioactive waste disposal. The regulation, Environmental Radiation Protection Standards for Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes (hereafter referred to as the Standard), was vacated in 1987 by a Federal Court of Appeals and is underground revision. By agreement with the Sate of New Mexico, the WIPP project is evaluating compliance with the Standard as promulgated, in 1985 until a new regulation is available. This report summarizes the early-1990 status of Sandia National Laboratories' (SNL) understanding of the Project's ability to achieve compliance. The report reviews the qualitative and quantitative requirements for compliance, and identifies unknowns complicating performance assessment. It discusses in relatively nontechnical terms the approaches to resolving those unknowns, and concludes that SNL has reasonable confidence that compliance is achievable with the Standard as first promulgated. 46 refs., 7 figs.

  1. Zero discharge performance of an industrial pilot-scale plant treating palm oil mill effluent.

    PubMed

    Wang, Jin; Mahmood, Qaisar; Qiu, Jiang-Ping; Li, Yin-Sheng; Chang, Yoon-Seong; Chi, Li-Na; Li, Xu-Dong

    2015-01-01

    Palm oil is one of the most important agroindustries in Malaysia. Huge quantities of palm oil mill effluent (POME) pose a great threat to aqueous environment due to its very high COD. To make full use of discharged wastes, the integrated "zero discharge" pilot-scale industrial plant comprising "pretreatment-anaerobic and aerobic process-membrane separation" was continuously operated for 1 year. After pretreatment in the oil separator tank, 55.6% of waste oil in raw POME could be recovered and sold and anaerobically digested through 2 AnaEG reactors followed by a dissolved air flotation (DAF); average COD reduced to about 3587 mg/L, and biogas production was 27.65 times POME injection which was used to generate electricity. The aerobic effluent was settled for 3 h or/and treated in MBR which could remove BOD3 (30°C) to less than 20 mg/L as required by Department of Environment of Malaysia. After filtration by UF and RO membrane, all organic compounds and most of the salts were removed; RO permeate could be reused as the boiler feed water. RO concentrate combined with anaerobic surplus sludge could be used as biofertilizer.

  2. Biorefinery concept in a microalgae pilot plant. Culturing, dynamic filtration and steam explosion fractionation.

    PubMed

    Nurra, C; Torras, C; Clavero, E; Ríos, S; Rey, M; Lorente, E; Farriol, X; Salvadó, J

    2014-07-01

    A 53 m(3) microalgae pilot plant with semi-closed photobioreactors has been operated in batch mode at Tarragona, where proper climatic conditions exist. Operations carried-out were microalgae culturing, concentration, cell disruption and lipid extraction. Culturing was performed with and without CO2 fertilization. pH was used to control CO2 dosing. With CO2 fertilization best microalgae concentrations were obtained. Productivities up to 19.9 g/m(2)/day were reached. Although sedimentation and centrifugation was performed, studies focused on dynamic membrane filtration as improved technique compared with conventional one. Significant fouling reduction was obtained by using a vibrational membrane setup. Cell disruption including product pre-extraction was performed by using steam explosion at moderate conditions, as novel technique for this application. Lipid extraction was performed by using conventional techniques with and without exploded material. The amount of lipids obtained from exploded material was higher than with non-exploded material, which shows that steam explosion provides a clear enhancement.

  3. Actinide chemistry research supporting the Waste Isolation Pilot Plant (WIPP): FY94 results

    SciTech Connect

    Novak, C.F.

    1995-08-01

    This document contains six reports on actinide chemistry research supporting the Waste Isolation Pilot Plant (WIPP). These reports, completed in FY94, are relevant to the estimation of the potential dissolved actinide concentrations in WIPP brines under repository breach scenarios. Estimates of potential dissolved actinide concentrations are necessary for WIPP performance assessment calculations. The specific topics covered within this document are: the complexation of oxalate with Th(IV) and U(VI); the stability of Pu(VI) in one WIPP-specific brine environment both with and without carbonate present; the solubility of Nd(III) in a WIPP Salado brine surrogate as a function of hydrogen ion concentration; the steady-state dissolved plutonium concentrations in a synthetic WIPP Culebra brine surrogate; the development of a model for Nd(III) solubility and speciation in dilute to concentrated sodium carbonate and sodium bicarbonate solutions; and the development of a model for Np(V) solubility and speciation in dilute to concentrated sodium Perchlorate, sodium carbonate, and sodium chloride media.

  4. Temperature control in a 30 stage, 5-cm Centrifugal Contactor Pilot Plant

    SciTech Connect

    Jack D. Law; Troy G. Garn; David H. Meikrantz

    2009-09-01

    Temperature profile testing was performed using a 30 stage 5-cm centrifugal contactor pilot plant. These tests were performed to evaluate the ability to control process temperature by adjusting feed solution temperatures. This would eliminate the need for complex jacketed heat exchanger installation on the centrifugal contactors. Thermocouples were installed on the inlet and outlets of each stage, as well as directly in the mixing zone of several of the contactor stages. Lamp oil, a commercially available alkane mixture of C14 to C18 chains, and tap water adjusted to pH 2 with nitric acid were the solution feeds for the temperature profile testing. Temperature data profiles for an array of total throughputs and contactor rpm values for both single-phase and two-phase systems were collected with selected profiles. The total throughput ranged from 0.5-1.4 L/min with rotor speeds from 3500-4000 rpm. Inlet solution temperatures ranging from ambient up to 50 °C were tested. Results of the two-phase temperature profile testing are detailed

  5. Blending mining and nuclear industries at the Waste Isolation Pilot Plant

    SciTech Connect

    Walls, J.R.

    1990-01-01

    At the Waste Isolation Pilot Plant (WIPP) traditional procedures for underground mining activities have been significantly altered in order to assure underground safety and project adherence to numerous regulatory requirements. Innovative techniques have been developed for WIPP underground procedures, mining equipment, and operating environments. The mining emphasis at WIPP is upon the quality of the excavation, not (as in conventional mines) on the production of ore. The WIPP is a United States Department of Energy (DOE) project that is located 30 miles southeast of Carlsbad, New Mexico, where the nation's first underground engineered nuclear repository is being constructed. The WIPP site was selected because of its location amidst a 607 meter thick salt bed, which provides a remarkably stable rock formation for the permanent storage of nuclear waste. The underground facility is located 655 meters below the earth's surface, in the Salado formation, which comprises two-hundred million year old halites with minor amounts of clay and anhydrites. When completed, the WIPP underground facility will consist of two components: approximately 81 square kilometers of experimental areas, and approximately 405 square kilometers of repository. 3 figs.

  6. Performance Assessment in Support of the 1996 Compliance Certification Application for the Waste Isolation Pilot Plant

    SciTech Connect

    Anderson, D.R.; Basabilvazo, G.; Helton, J.C.; Jow, H.-N.; Marietta, M.G.

    1998-10-14

    The conceptual and computational structure of a performance assessment (PA) for the Waste Isolation Pilot Plant (WIPP) is described. Important parts of thk structure are @ maintenance of a separation between stochastic (i.e., aleatory) and subjective (i.e., epistemic) uncertain, with stochastic uncefinty arising from the many possible disruptions that could occur over the 10,000 Y regulatory period fiat applies to the WIPP and subjective uncertainty arising from `the imprecision with which many of the quantities rquired in tie `hdysis are known, (ii) use of Latin hypercttbe sampling to incorporate the effects of subjective uncefirtty, (iii) use of Monte Carlo (i.e., random) sampling to incorporate the effects of stochastic uncetinty, and OV) efficient use of tie necessarily limited number of mechanistic calculations that can be performed to SUPPOII the analysis. The WIPP is under development by the U.S. Department of Ener~ (DOE) for the geologic (i.e., deep underground) disposal of transuranic (TRU) waste, with the indicated PA supporting a ~Compliance Certification Application (CCA) by the DOE to the U.S. Environmental Protection Agency (EPA) in October 1996 for tie necessary certifications for the WIPP to begin operation. If certified, the WIPP will be the first operational faciliv in tie United States for the geologic disposal of ra&oactive waste.

  7. Characterization of alginate-like exopolysaccharides isolated from aerobic granular sludge in pilot-plant.

    PubMed

    Lin, Yuemei; de Kreuk, Merle; van Loosdrecht, M C M; Adin, Avner

    2010-06-01

    To understand functional gel-forming exopolysaccharides in aerobic granular sludge, alginate-like exopolysaccharides were specifically extracted from aerobic granular sludge cultivated in a pilot plant treating municipal sewage. The exopolysaccharides were identified by the FAO/WHO alginate identification tests, characterized by biochemical assays, gelation with Ca(2+), blocks fractionation, spectroscopic analysis as UV-visible, FT-IR and MALDI-TOF MS, and electrophoresis. The yield of extractable alginate-like exopolysaccharides was reached 160+/-4mg/g (VSS ratio). They resembled seaweed alginate in UV-visible and MALDI-TOF MS spectra, and distinguished from it in the reactions with acid ferric sulfate, phenol-sulfuric acid and Coomassie brilliant blue G250. Characterized by their high percentage of poly guluronic acid blocks (69.07+/-8.95%), the isolated exopolysaccharides were capable to form rigid, non-deformable gels in CaCl(2). They were one of the dominant exopolysaccharides in aerobic granular sludge. We suggest that polymers play a significant role in providing aerobic granular sludge a highly hydrophobic, compact, strong and elastic structure.

  8. Geochemistry of the Waste Isolation Pilot Plant (WIPP) Site, Southeastern New Mexico, USA

    SciTech Connect

    Lambert, S.J.

    1992-05-01

    An extensive geochemical data base, including analyses of major and minor solutes, mineralogical studies of core samples, and isotopic studies of waters, carbonates and sulfates, has been assembled for evaporites and related rocks in the northern Delaware Basin of southeastern New Mexico. These data were compiled for the geological and hydrological characterization of the Waste Isolation Pilot Plant (WIPP), which is excavated in the evaporites of the Salado Formation. These data were evaluated in order: 1. to determine the stability of the evaporite mineralogy over geological time; 2. to compare the aqueous geochemistry with host rock mineralogy; 3. to delineate the nature and timing of water-rock interactions, such as dissolution and recrystallization; and 4. to determine the geological and climatic conditions that have governed groundwater recharge. The resulting synthesis of data and current hypotheses concerning the origin, composition and history of waters in the evaporite rocks and related units of the Delaware Basin provides a tentative conceptual model for the behavior of the water-rock system since the deposition of the evaporites in the Permian. Essential components of this model include: 1. widespread Late Triassic/Early Jurassic evaporite recrystallization; 2. accumulation of deep-basin brines isolated from meteoric recharge; 3. evaporite dissolution by meteoric waters flowing in carbonates and sulfates interbedded in the uppermost Permian section and at the basin margin; 4. lateral rather than vertical infiltration of pre-Holocene meteoric waters in the uppermost Permian section; 5. climatic conditions presently less conducive to recharge than in the late Pleistocene.

  9. Conceptual structure of the 1996 performance assessment for the Waste Isolation Pilot Plant

    SciTech Connect

    HELTON,JON CRAIG; ANDERSON,D. RICHARD; BASABILVAZO,G.; JOW,HONG-NIAN; MARIETTA,MELVIN G.

    2000-05-18

    The conceptual structure of the 1996 performance assessment (PA) for the Waste Isolation Pilot Plant (WIPP) is described. This structure involves three basic entities (EN1, EN2, EN3): (1) EN1, a probabilistic characterization of the likelihood of different futures occurring at the WIPP site over the next 10,000 yr, (2) EN2, a procedure for estimating the radionuclide releases to the accessible environment associated with each of the possible futures that could occur at the WIPP site over the next 10,000 yr, and (3) EN3, a probabilistic characterization of the uncertainty in the parameters used in the definition of EN1 and EN2. In the formal development of the 1996 WIPP PA, EN1 is characterized by a probability space (S{sub st}, P{sub st}, p{sub st}) for stochastic (i.e., aleatory) uncertainly; EN2 is characterized by a function {line_integral} that corresponds to the models and associated computer programs used to estimate radionuclide releases; and EN3 is characterized by a probability space (S{sub su}, P{sub su}, p{sub su}) for subjective (i.e., epistemic) uncertainty. A high-level overview of the 1996 WIPP PA and references to additional sources of information are given in the context of (S{sub st}, P{sub st}, p{sub st}), {line_integral} and (S{sub su}, P{sub su}, p{sub su}).

  10. Influence of material and tube size on DUWLs contamination in a pilot plant.

    PubMed

    Sacchetti, Rossella; De Luca, Giovanna; Zanetti, Franca

    2007-01-01

    Numerous studies have shown that the water discharged from dental unit waterlines (DUWLs) contains high densities of bacteria, especially non-fermenting Gram negative bacteria. The aim of the present study was to investigate how the material (polyethylene-PE and polytetrafluorethylene-PTFE) and size (1.6 and 4.0 mm) of 4 waterlines in a pilot plant influence the level of contamination in the output water. The water contamination was assessed by analyzing the trend of the heterotrophic plate counts at 22 degrees C as a function of time and by testing for non-fermenting Gram negative bacteria. In all waterlines, the bacterial density increased exponentially during the first months and thereafter remained between 10(4) and 10(6) cfu/ml. However, the plate count at 22 degrees C was lower in the water from PTFE tubes and from larger size tubes. Comamonas acidovorans, Pseudomonas aeruginosa and Pseudomonas fluorescens were isolated. Pseudomonas aeruginosa, responsible for infections associated with dental practice, was never isolated in the output water from PTFE tubes. In order to control bacterial contamination the results suggest the use of waterlines made of PTFE on account of their ability to inhibit the colonization and growth of Pseudomonas aeruginosa.

  11. Atmospheric Dispersion Modeling of the February 2014 Waste Isolation Pilot Plant Release

    SciTech Connect

    Nasstrom, John; Piggott, Tom; Simpson, Matthew; Lobaugh, Megan; Tai, Lydia; Pobanz, Brenda; Yu, Kristen

    2015-07-22

    This report presents the results of a simulation of the atmospheric dispersion and deposition of radioactivity released from the Waste Isolation Pilot Plant (WIPP) site in New Mexico in February 2014. These simulations were made by the National Atmospheric Release Advisory Center (NARAC) at Lawrence Livermore National Laboratory (LLNL), and supersede NARAC simulation results published in a previous WIPP report (WIPP, 2014). The results presented in this report use additional, more detailed data from WIPP on the specific radionuclides released, radioactivity release amounts and release times. Compared to the previous NARAC simulations, the new simulation results in this report are based on more detailed modeling of the winds, turbulence, and particle dry deposition. In addition, the initial plume rise from the exhaust vent was considered in the new simulations, but not in the previous NARAC simulations. The new model results show some small differences compared to previous results, but do not change the conclusions in the WIPP (2014) report. Presented are the data and assumptions used in these model simulations, as well as the model-predicted dose and deposition on and near the WIPP site. A comparison of predicted and measured radionuclide-specific air concentrations is also presented.

  12. Computational implementation of a systems prioritization methodology for the Waste Isolation Pilot Plant: A preliminary example

    SciTech Connect

    Helton, J.C.; Anderson, D.R.; Baker, B.L.

    1996-04-01

    A systems prioritization methodology (SPM) is under development to provide guidance to the US DOE on experimental programs and design modifications to be supported in the development of a successful licensing application for the Waste Isolation Pilot Plant (WIPP) for the geologic disposal of transuranic (TRU) waste. The purpose of the SPM is to determine the probabilities that the implementation of different combinations of experimental programs and design modifications, referred to as activity sets, will lead to compliance. Appropriate tradeoffs between compliance probability, implementation cost and implementation time can then be made in the selection of the activity set to be supported in the development of a licensing application. Descriptions are given for the conceptual structure of the SPM and the manner in which this structure determines the computational implementation of an example SPM application. Due to the sophisticated structure of the SPM and the computational demands of many of its components, the overall computational structure must be organized carefully to provide the compliance probabilities for the large number of activity sets under consideration at an acceptable computational cost. Conceptually, the determination of each compliance probability is equivalent to a large numerical integration problem. 96 refs., 31 figs., 36 tabs.

  13. Waste Isolation Pilot Plant annual site environmental report for calendar year 1992

    SciTech Connect

    Not Available

    1993-12-31

    The US Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) Operational Environmental Monitoring Plan (OEMP) defined a comprehensive set of parameters which are monitored to detect potential environmental impacts and establish baselines for future environmental evaluations. Surface water and groundwater, air, soil, and biotics are monitored for radioactivity levels. Nonradiological environmental monitoring activities include air, water quality, soil properties, meteorological measurements and determination of the status of the local biological community. Ecological studies focus on the immediate area surrounding the WIPP site with emphasis on the salt storage pile. The baseline radiological surveillance covers a broader geographic area including nearby ranches, villages, and cities. Since the WIPP is still in its preoperational phase (i.e., no waste has been received) certain operational requirements of DOE Orders 5400.1, 5400.5, and the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T) are not relevant. Therefore, this report does not discuss items such as radionuclide emissions and effluents and subsequent doses to the public.

  14. Deep geologic disposal of mixed waste in bedded salt: The Waste Isolation Pilot Plant

    SciTech Connect

    Rempe, N.T.

    1993-12-01

    Mixed waste (i.e., waste that contains both chemically hazardous and radioactive components) poses a moral, political, and technical challenge to present and future generations. But an international consensus is emerging that harmful byproducts and residues can be permanently isolated from the biosphere in a safe and environmentally responsible manner by deep geologic disposal. To investigate and demonstrate such disposal for transuranic mixed waste, derived from defense-related activities, the US Department of Energy has prepared the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico. This research and development facility was excavated approximately at the center of a 600 m thick sequence of salt (halite) beds, 655 m below the surface. Proof of the long-term tectonic and hydrological stability of the region is supplied by the fact that these salt beds have remained essentially undisturbed since they were deposited during the Late Permian age, approximately 225 million years ago. Plutonium-239, the main radioactive component of transuranic mixed waste, has a half-life of 24,500 years. Even ten half-lives of this isotope - amounting to about a quarter million years, the time during which its activity will decline to background level represent only 0.11 percent of the history of the repository medium. Therefore, deep geologic disposal of transuranic mixed waste in Permian bedded salt appears eminently feasible.

  15. Surface complexation modeling of uranyl adsorption on corrensite from the Waste Isolation Pilot Plant Site

    SciTech Connect

    Park, Sang-Won; Leckie, J.O.; Siegel, M.D.

    1995-09-01

    Corrensite is the dominant clay mineral in the Culebra Dolomite at the Waste Isolation Pilot Plant. The surface characteristics of corrensite, a mixed chlorite/smectite clay mineral, have been studied. Zeta potential measurements and titration experiments suggest that the corrensite surface contains a mixture of permanent charge sites on the basal plane and SiOH and AlOH sites with a net pH-dependent charge at the edge of the clay platelets. Triple-layer model parameters were determined by the double extrapolation technique for use in chemical speciation calculations of adsorption reactions using the computer program HYDRAQL. Batch adsorption studies showed that corrensite is an effective adsorbent for uranyl. The pH-dependent adsorption behavior indicates that adsorption occurs at the edge sites. Adsorption studies were also conducted in the presence of competing cations and complexing ligands. The cations did not affect uranyl adsorption in the range studied. This observation lends support to the hypothesis that uranyl adsorption occurs at the edge sites. Uranyl adsorption was significantly hindered by carbonate. It is proposed that the formation of carbonate uranyl complexes inhibits uranyl adsorption and that only the carbonate-free species adsorb to the corrensite surface. The presence of the organic complexing agents EDTA and oxine also inhibits uranyl sorption.

  16. Criticality safety analysis for remote handled TRU waste at the Waste Isolation Pilot Plant

    SciTech Connect

    Not Available

    1988-07-01

    The Waste Isolation Pilot Plant (WIPP) is a facility designed to store transuranic (TRU) waste underground in a mined salt bed. All fissile nuclides except U/sup 235/ are considered TRU nuclides. This report presents the results of the nuclear criticality analysis for Remote-Handled (RH) TRU waste stored at the WIPP site. The RH waste material will be contained in steel canisters that are five feet or ten feet long. Each ten foot canister is capable of holding three 55 gallon drums of waste material. The five foot canisters are to be welded together to form one ten foot long canister. In general the fissile waste material is mainly surface contamination on clothing, wipes, wrappings, tools, etc., or mixed in a borosilicate glass matrix or concrete. Other fissile material may be contained in absorbent mixtures. As a result, the fissile material will typically be spread over a large fraction of the volume in most of the waste storage canisters. Typical isotopic content of the fissile/other radioactive material is shown in Table 1-1. This analysis will analyze the RH waste storage and handling configurations at the WIPP site to show that up to 600 grams of fissile material per ten foot canister can be received and stored at the site without criticality safety concerns. 6 refs., 14 figs., 1 tab.

  17. Decontamination of industrial cyanide-containing water in a solar CPC pilot plant

    SciTech Connect

    Duran, A.; Monteagudo, J.M.; San Martin, I.; Aguirre, M.

    2010-07-15

    The aim of this work was to improve the quality of wastewater effluent coming from an Integrated Gasification Combined-Cycle (IGCC) power station to meet with future environmental legislation. This study examined a homogeneous photocatalytic oxidation process using concentrated solar UV energy (UV/Fe(II)/H{sub 2}O{sub 2}) in a Solar Compound Parabolic Collector (CPC) pilot plant. The efficiency of the process was evaluated by analysis of the oxidation of cyanides and Total Organic Carbon (TOC). A factorial experimental design allowed the determination of the influences of operating variables (initial concentration of H{sub 2}O{sub 2}, oxalic acid and Fe(II) and pH) on the degradation kinetics. Temperature and UV-A solar power were also included in the Neural Network fittings. The pH was maintained at a value >9.5 during cyanide oxidation to avoid the formation of gaseous HCN and later lowered to enhance mineralization. Under the optimum conditions ([H{sub 2}O{sub 2}] = 2000 ppm, [Fe(II)] = 8 ppm, pH = 3.3 after cyanide oxidation, and [(COOH){sub 2}] = 60 ppm), it was possible to degrade 100% of the cyanides and up to 92% of Total Organic Carbon. (author)

  18. Struvite formation from the supernatants of an anaerobic digestion pilot plant.

    PubMed

    Pastor, L; Mangin, D; Ferrer, J; Seco, A

    2010-01-01

    This work studied the influence of the characteristics of the supernatants on the struvite precipitation process. Eighteen experiments with the supernatants generated in an anaerobic digestion pilot plant were performed in a stirred reactor. In order to obtain the pH control during the crystallization process, a Fuzzy Logic based controller was used. High phosphorus precipitation and recovery efficiencies were obtained. The composition of the supernatants was analyzed in order to study its influence on the solids formed from those solutions. The presence of calcium reduced the percentage of phosphorus precipitated as struvite leading to the formation of amorphous calcium phosphate (ACP), which tended to be lost with the effluent of the reactor. Calcite was also formed when supernatants with high magnesium:phosphorus (Mg/P) and calcium:phosphorus (Ca/P) molar ratios were employed. Some ammonium volatilization by conversion to NH(3) occurred in all the experiments. The use of air to increase the pH to an adequate value showed to be feasible. Aeration cleaned struvite crystals from suspended solids, which makes aeration interesting for struvite separation. However, aeration slightly increased the loss of phosphorus with the effluent of the reactor and promoted ammonium volatilization.

  19. Geochemistry of Salado Formation brines recovered from the Waste Isolation Pilot Plant (WIPP) repository

    SciTech Connect

    Abitz, R.; Myers, J.; Drez, P.; Deal, D.

    1990-01-01

    Intergranular brines recovered from the repository horizon of the Waste Isolation Pilot Plant (WIPP) have major- and trace-element compositions that reflect seawater evaporation and diagenetic processes. Brines obtained from repository drill holes are heterogenous with respect to composition, but their compositional fields are distinct from those obtained from fluid inclusions in WIPP halite. The heterogeneity of brine compositions within the drill-hole population indicates a lack of mixing and fluid homogenization within the salt at the repository level. Compositional differences between intergranular (drill hole) and intragranular (fluid inclusions) brines is attributed to isolation of the latter from diagenetic fluids that were produced from dehydration reactions involving gypsum and clay minerals. Modeling of brine-rock equilibria indicates that equilibration with evaporite minerals controls the concentrations of major elements in the brine. Drill-hole brines are in equilibrium with the observed repository minerals halite, anhydrite, magnesite, polyhalite and quartz. The equilibrium model supports the derivation of drill-hole brines from near-field fluid, rather than large-scale vertical migration of fluids from the overlying Rustler or underlying Castile Formations. 13 refs., 6 figs., 6 tabs.

  20. Consideration of nuclear criticality when disposing of transuranic waste at the Waste Isolation Pilot Plant

    SciTech Connect

    RECHARD,ROBERT P.; SANCHEZ,LAWRENCE C.; STOCKMAN,CHRISTINE T.; TRELLUE,HOLLY R.

    2000-04-01

    Based on general arguments presented in this report, nuclear criticality was eliminated from performance assessment calculations for the Waste Isolation Pilot Plant (WIPP), a repository for waste contaminated with transuranic (TRU) radioisotopes, located in southeastern New Mexico. At the WIPP, the probability of criticality within the repository is low because mechanisms to concentrate the fissile radioisotopes dispersed throughout the waste are absent. In addition, following an inadvertent human intrusion into the repository (an event that must be considered because of safety regulations), the probability of nuclear criticality away from the repository is low because (1) the amount of fissile mass transported over 10,000 yr is predicted to be small, (2) often there are insufficient spaces in the advective pore space (e.g., macroscopic fractures) to provide sufficient thickness for precipitation of fissile material, and (3) there is no credible mechanism to counteract the natural tendency of the material to disperse during transport and instead concentrate fissile material in a small enough volume for it to form a critical concentration. Furthermore, before a criticality would have the potential to affect human health after closure of the repository--assuming that a criticality could occur--it would have to either (1) degrade the ability of the disposal system to contain nuclear waste or (2) produce significantly more radioisotopes than originally present. Neither of these situations can occur at the WIPP; thus, the consequences of a criticality are also low.

  1. Scenario development for the Waste Isolation Pilot Plant compliance certification application

    SciTech Connect

    GALSON,D.A.; SWIFT,PETER N.; ANDERSON,D. RICHARD; BENNETT,D.G.

    1998-09-23

    Demonstrating compliance with the applicable regulations for the Waste Isolation Pilot Plant (WIPP) requires an assessment of the long-term performance of the disposal system. Scenario development is one starting point of this assessment, and generates inquiry about the present state and future evolution of the disposal system. Scenario development consists of four tasks: (1) identifying and classifying features, events and processes (FEPs), (2) screening FEPs according to well-defined criteria, (3) forming scenarios (combinations of FEPs) in the context of regulatory performance criteria and (4) specifying of scenarios for consequence analysis. The development and screening of a comprehensive FEP list provides assurance that the identification of significant processes and events is complete, that potential interactions between FEPs are not overlooked, and that responses to possible questions are available and well documented. Two basic scenarios have been identified for the WIPP: undisturbed performance (UP) and disturbed performance (DP). The UP scenario is used to evaluate compliance with the Environmental Protection Agency's (EPA's) Individual Dose (40 CFR Section 191-15) and Groundwater Protection (40 CFR Section 191-24) standards and accounts for all natural-, waste- and repository-induced FEPs that survive the screening process. The DP scenario is required for assessment calculations for the EPA's cumulative release standard (Containment Requirements, 40 CFR Section 191-13) and accounts for disruptive future human events, which have an uncertain probability of occurrence, in addition to the UP FEPs.

  2. Aerobic thermophilic treatment of sewage sludge at pilot plant scale. 2. Technical solutions and process design.

    PubMed

    Ponti, C; Sonnleitner, B; Fiechter, A

    1995-01-15

    The performance of the ATS process depends essentially on the oxygen transfer efficiency. Improvement of the mass transfer capacity of a bioreactor allowed to reduce the incubation time necessary to attain sludge stabilization. It is important to use equipment with a high aeration efficiency such as an injector aeration system. The ratio between the total oxygen consumption and the organic matter degradation (delta COD) ranged between 0.4 and 0.8 in the pilot plant, whereas 1.23 was found in completely mixed bioreactors (Bomio, 1990). No significant improvement of the bacterial degradation efficiency was attained with a specific power input exceeding 6-8 kW m-3. A mean residence time of less than 1 d allowed organic matter removals up to 40% with specific power consumption of 10 kWh kg-1 COD oxidized. The sludge hygienization is one of the objectives and benefits of the thermophilic treatment: not only temperature but also the total solids content were important factors affecting inactivation of pathogens. The inactivation rate was promoted by the increase of temperature, while the residual colony forming units decreased with reducing the total solids content of sewage sludge. It is concluded that continuous operation mode would not affect the quality of the hygienization but could display the high degradation potential of the aerobic system.

  3. Correlation of drillhole and shaft logs. Waste Isolation Pilot Plant (WIPP) project, southeastern New Mexico

    SciTech Connect

    Jarolimek, L.; Timmer, M.J.; Powers, D.W.

    1983-03-01

    This report on stratigraphic correlations from drillhole and shaft data along a generally north-south section across the potential extent of underground excavations of the Waste Isolation Pilot Plant (WIPP) facility was prepared as part of the Site Validation Field Program Plan. The results provide (1) input for the report entitled ''Results of Site Validation Experiments,'' (2) input for other WIPP-related investigations, including the Design Validation Program, and (3) a framework for further underground activities at WIPP. In general, this correlation study confirmed previous findings, including: relatively high consistency of thickness and lateral continuity of all beds within the Salado Formation, especially in the host rock interval; gentle, generally south and southeastward dips/slopes of the host rock interval strata; close correspondence between stratigraphic data obtained from the present underground excavations and data derived from the previous investigative drillholes and shafts; and depositional origin of the undulations on the top of Marker Bed (MB) 139 and relatively small variation in its thickness (1.2 to 4.1 feet).

  4. Waste Isolation Pilot Plant site environmental report for calendar year 1994

    SciTech Connect

    1995-06-01

    US Department of Energy (DOE) Order 5400.1 General Environmental Protection Program, requires each DOE facility that conducts significant environmental protection programs to prepare an Annual Site Environmental Report (ASER). The purpose of the ASER is to summarize environmental data in order to characterize site environmental management performance, to confirm compliance with environmental standards and requirements, and to highlight significant programs and efforts. This ASER not only documents the required data, it also documents new and continued monitoring and compliance activities during the 1994 calendar year. Data contained in this report are derived from those monitoring programs directed by the Waste Isolation Pilot Plant (WIPP) Environmental Monitoring Plan (EMP) (DOE/WIPP 94-024). The EMP defines a comprehensive set of parameters that must be monitored to detect potential impacts to the environment and to establish baseline measurements for future environmental evaluations. Surface water, groundwater, air, soil, and biotics are monitored for radiological and nonradiological activity levels. The baseline radiological surveillance program covers the broader geographic area that encompasses nearby ranches, villages, and cities. Nonradiological studies focus on the area immediately surrounding the WIPP site.

  5. Conceptual structure of performance assessments conducted for the Waste Isolation Pilot Plant

    SciTech Connect

    Helton, J.C.; Marietta, M.G.; Rechard, R.P.

    1993-04-01

    The Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico is being developed by the US Department of Energy as a disposal facility for transuranic waste. In support of this project, Sandia National Laboratories is conducting an ongoing performance assessment (PA) for the WIPP. The ordered triple representation for risk proposed by Kaplan and Garrick is used to provide a clear conceptual structure for this PA. This presentation describes how the preceding representation provides a basis in the WIPP PA for (1) the definition of scenarios and the calculation of scenario probabilities and consequences, (2) the separation of subjective and stochastic uncertainties, (3) the construction of the complementary cumulative distribution functions required in comparisons with the US Environmental Protection Agency`s standard for the geologic disposal of radioactive waste (i.e., 40 CFR Part 191, Subpart B), and (4) the performance of uncertainty and sensitivity studies. Results obtained in a preliminary PA for the WIPP completed in December of 1991 are used for illustration.

  6. Status of Waste Isolation Pilot Plant compliance with 40 CFR 191B, December 1992

    SciTech Connect

    Marietta, M.G.; Anderson, D.R.

    1993-10-01

    Before disposing of transuranic radioactive waste at the Waste Isolation Pilot Plant (WIPP), the US Department of Energy (DOE) must evaluate compliance with long-term regulations of the US Environmental Protection Agency (EPA). Sandia National Laboratories (SNL) is conducting iterative performance assessments (PAs) of the WIPP for the DOE to provide interim guidance while preparing for final compliance evaluations. This paper describes the 1992 preliminary comparison with Subpart B of the Environmental Standards for the Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes (40 CFR 191), which regulates long-term releases of radioactive waste. Results of the 1992 PA are preliminary, and cannot be used to determine compliance or noncompliance with EPA regulations because portions of the modeling system and data base are incomplete. Results are consistent, however, with those of previous iterations of PA, and the SNL WIPP PA Department has high confidence that compliance with 40 CFR 191B can be demonstrated. Comparison of predicted radiation doses from the disposal system also gives high confidence that the disposal system is safe for long-term isolation.

  7. Solar treatment of cork boiling and bleaching wastewaters in a pilot plant.

    PubMed

    Vilar, Vítor J P; Maldonado, Manuel I; Oller, I; Malato, Sixto; Boaventura, Rui A R

    2009-09-01

    This paper reports on cork boiling and bleaching wastewaters treatment by solar photocatalytic processes, TiO(2)/UV and Fe(2+)/H(2)O(2)/UV (TiO(2)-only for bleaching wastewater), in a pilot plant with compound parabolic collectors. The photo-Fenton reaction (k=0.12L/kJ(UV), r(0)=59.4 mg/kJ(UV)) is much more efficient that TiO(2) photocatalysis and TiO(2)+S(2)O(8)(2-) (k=0.0024 L/kJ(UV), r(0)=1.36 mg/kJ(UV)), leading to 94% mineralization of the bleaching wastewater after 31.5 kJ(UV)/L, consuming 77.1mM of H(2)O(2) (3.0 mmol/kJ(UV)) and using 20 mg/L of iron. For the cork boiling wastewater, after a slow initial reaction rate, the DOC degradation curve shows a first-order kinetics behaviour (k=0.015 L/kJ(UV), r(0)=20.8 mg/kJ(UV)) until 173 kJ(UV)/L ( approximately 300 mgC/L). According to the average oxidation state (AOS), toxicity profiles, respirometry and kinetic results obtained in two solar CPCs plants, the optimal energy dose estimated for phototreatment to reach a biodegradable effluent is 15 kJ(UV)/L and 114 kJ(UV)/L, consuming 33 mM and 151 mM of H(2)OT:/PGN/ELSEVIER/WR/web/00007490/(2), achieving almost 49% and 48% mineralization of the wastewaters, respectively for the cork bleaching and boiling wastewaters.

  8. PREPP (Process Experimental Pilot Plant) rotary kiln seals: Problem and resolution

    SciTech Connect

    Drexler, R.L. )

    1990-01-01

    The Process Experimental Pilot Plant (PREPP) is a facility designed to demonstrate processing of low level chemical and transuranic hazardous waste. The plant includes equipment for handling the incoming waste containers, shredding, incineration and cooling the waste, grouting the residue and scrubbing and filtration of the off gas. The process incinerator is a rotary kiln approximately 8-{1/2} ft diameter and 25 ft long with a rotary seal assembly at each end. Each seal assembly consists of a primary, secondary and tertiary seal, with a positive air pressure between primary and secondary seals to prevent out-leakage from the kiln. The kiln operates at 0.5 inch water negative pressure. From the very outset the kiln seals exhibited excessive drag which taxed the kiln drive capacity and excessive in-leakage which limited kiln temperature. An engineering evaluation concluded that the original seals supplied by the kiln vendor could not accommodate expansion and centerline shift of the kiln resulting from heatup of the kiln and its support system. A totally new concept kiln seal design has been generated to replace the (modified) original seals. This new seal system has been designed to provide a very tight long lasting seal which will accommodate the 1.5 inch axial shift and up to 1 inch radial movement of the kiln shell. Design lifetime of the seal is 10,000 operating hours between major maintenance services while maintaining an acceptable leak rate hot or cold, rotating or stopped. The design appears adaptable to any size kiln and is suitable for retrofit to existing kilns. A one-third scale prototype seal assembly is being built to verify the concept prior to construction of the 10 ft diameter seals for the PREPP rotary kiln. 4 figs.

  9. Integrated bicarbonate-form ion exchange treatment and regeneration for DOC removal: Model development and pilot plant study.

    PubMed

    Hu, Yue; Boyer, Treavor H

    2017-05-15

    The application of bicarbonate-form anion exchange resin and sodium bicarbonate salt for resin regeneration was investigated in this research is to reduce chloride ion release during treatment and the disposal burden of sodium chloride regeneration solution when using traditional chloride-form ion exchange (IX). The target contaminant in this research was dissolved organic carbon (DOC). The performance evaluation was conducted in a completely mixed flow reactor (CMFR) IX configuration. A process model that integrated treatment and regeneration was investigated based on the characteristics of configuration. The kinetic and equilibrium experiments were performed to obtain required parameters for the process model. The pilot plant tests were conducted to validate the model as well as provide practical understanding on operation. The DOC concentration predicted by the process model responded to the change of salt concentration in the solution, and showed a good agreement with pilot plant data with less than 10% difference in terms of percentage removal. Both model predictions and pilot plant tests showed over 60% DOC removal by bicarbonate-form resin for treatment and sodium bicarbonate for regeneration, which was comparable to chloride-form resin for treatment and sodium chloride for regeneration. Lastly, the DOC removal was improved by using higher salt concentration for regeneration.

  10. Monitoring and toxicity evaluation of phytoplankton on lithium manganese oxide adsorbents at lithium recovery pilot plant field.

    NASA Astrophysics Data System (ADS)

    Yoon, H. O.; Kim, J. A.; Kim, J. C.; Chung, K. S.; Ryu, J. H.

    2015-12-01

    For recovery of rare mineral resources such as lithium or boron from seawater, the lithium adsorbent material have been made by Korea Institute of Geoscience and Mineral Resources (KIGAM) and pilot plant was conducted in Okgye Harbor, Gangneung, Korea. The application of lithium adsorbent in pilot plant, it is important to consider the impact on the marine environment. Especially phytoplankton communities are important marine microorganism to represent marine primary product. At the same time, phytoplankton is possible to induce the decrease of lithium recovery rate due to cause of biofouling to surfaces of lithium adsorbents. Therefore long-term and periodic monitoring of phytoplankton is necessary to understand the environmental impact and biofouling problems near the lithium pilot plant. The abundance and biomass of phytoplankton have been evaluated through monthly interval sampling from February 2013 to May 2015. Abundance and species diversity of phytoplankton went up to summer from winter. When lithium adsorbents were immersing to seawater, eco-toxicities of released substances were determined using Microtox with bioluminescence bacteria Vibrio fischeri. The adsorbents were soaked in sterilized seawater and aeration for 1, 3, 5, 7, 10 and 14 days intervals under controlled temperature. Maximum EC50 concentration was 61.4% and this toxicity was showed in more than 10 days exposure.

  11. Draft forecast of the final report for the comparison to 40 CFR Part 191, Subpart B, for the Waste Isolation Pilot Plant

    SciTech Connect

    Bertram-Howery, S.G.; Marietta, M.G.; Anderson, D.R.; Gomez, L.S.; Rechard, R.P. ); Brinster, K.F.; Guzowski, R.V. )

    1989-12-01

    The United States Department of Energy is planning to dispose of transuranic wastes, which have been generated by defense programs, at the Waste Isolation Pilot Plant. The WIPP Project will assess compliance with the requirements of the United States Environmental Protection Agency. This report forecasts the planned 1992 document, Comparison to 40 CFR, Part 191, Subpart B, for the Waste Isolation Pilot Plant (WIPP). 130 refs., 36 figs., 11 tabs.

  12. Determination of dispersion parameters for oxidizing air and the oxidation rate of calcium sulfites in a pilot desulfurization plant

    SciTech Connect

    Burenkov, D.K.; Derevich, I.V.; Rzaev, A.I.

    1995-10-01

    In the effort to remove sulfur oxides from waste gases, the widest use is gained by desulfurization plants based on wet collection of sulfur dioxide in empty absorbers in which a limestone-gypsum suspension is sprayed, with gypsum being produced as a commodity product. Dispersion of oxidizing air in a model liquid and the oxidation rate of calcium sulfites in a suspension contained in the sump of a pilot desulfurization plant absorber are studied experimentally. Flow velocities, bubble trajectories, and oxidation rates were determined and are presented.

  13. Disinfection of model indicator organisms in a drinking water pilot plant by using PEROXONE.

    PubMed Central

    Wolfe, R L; Stewart, M H; Liang, S; McGuire, M J

    1989-01-01

    PEROXONE is an advanced oxidation process generated by combining ozone and hydrogen peroxide. This process stimulates the production of hydroxyl radicals, which have been shown to be superior to ozone for the destruction of some organic contaminants. In this study, pilot-scale experiments were conducted to evaluate the microbicidal effectiveness of PEROXONE and ozone against three model indicator groups. Escherichia coli and MS2 coliphage were seeded into the influent to the preozonation contactors of a pilot plant simulating conventional water treatment and were exposed to four ozone dosages (0.5, 1.0, 2.0, and 4.0 mg/liter), four hydrogen peroxide/ozone (H2O2/O3) weight ratios (0, 0.3, 0.5, and 0.8), and four contact times (4, 5, 12, and 16 min) in two source waters--Colorado River water and state project water--of different quality. The removal of heterotrophic plate count bacteria was also monitored. Results of the study indicated that the microbicidal activity of PEROXONE was greatly affected by the applied ozone dose, H2O2/O3 ratio, contact time, source water quality, and type of microorganism tested. At contact times of 5 min or less, ozone alone was a more potent bactericide than PEROXONE at all H2O2/O3 ratios tested. However, this decrease in the bactericidal potency of PEROXONE was dramatic only as the H2O2/O3 ratio was increased from 0.5 to 0.8. The fact that the bactericidal activity of PEROXONE generally decreased with increasing H2O2/O3 ratios was thought to be related to the lower ozone residuals produced. The viricidal activity of PEROXONE and ozone was comparable at all of the H2O2/O3 ratios. Heterotrophic plate count bacteria were the most resistant group of organisms. Greater inactivation of E. coli and MS2 was observed in Colorado River water than in state project water and appeared to result from differences in the turbidity and alkalinity of the two waters. Regardless of source water, greater than 4.5 log10 of E. coli and MS2 was inactivated

  14. Interpretations of Tracer Tests Performed in the Culebra Dolomite at the Waste Isolation Pilot Plant Site

    SciTech Connect

    MEIGS,LUCY C.; BEAUHEIM,RICHARD L.; JONES,TOYA L.

    2000-08-01

    This report provides (1) an overview of all tracer testing conducted in the Culebra Dolomite Member of the Rustler Formation at the Waste Isolation Pilot Plant (WPP) site, (2) a detailed description of the important information about the 1995-96 tracer tests and the current interpretations of the data, and (3) a summary of the knowledge gained to date through tracer testing in the Culebra. Tracer tests have been used to identify transport processes occurring within the Culebra and quantify relevant parameters for use in performance assessment of the WIPP. The data, especially those from the tests performed in 1995-96, provide valuable insight into transport processes within the Culebra. Interpretations of the tracer tests in combination with geologic information, hydraulic-test information, and laboratory studies have resulted in a greatly improved conceptual model of transport processes within the Culebra. At locations where the transmissivity of the Culebra is low (< 4 x 10{sup -6} m{sup 2}/s), we conceptualize the Culebra as a single-porosity medium in which advection occurs largely through the primary porosity of the dolomite matrix. At locations where the transmissivity of the Culebra is high (> 4 x 10{sup -6} m{sup 2}/s), we conceptualize the Culebra as a heterogeneous, layered, fractured medium in which advection occurs largely through fractures and solutes diffuse between fractures and matrix at multiple rates. The variations in diffusion rate can be attributed to both variations in fracture spacing (or the spacing of advective pathways) and matrix heterogeneity. Flow and transport appear to be concentrated in the lower Culebra. At all locations, diffusion is the dominant transport process in the portions of the matrix that tracer does not access by flow.

  15. An appraisal of the 1992 preliminary performance assessment for the Waste Isolation Pilot Plant

    SciTech Connect

    Lee, W.W.L.; Chaturvedi, L.; Silva, M.K.; Weiner, R.; Neill, R.H. |

    1994-09-01

    The purpose of the New Mexico Environmental Evaluation Group is to conduct an independent technical evaluation of the Waste Isolation Pilot Plant (WIPP) Project to ensure the protection of the public health and safety and the environment. The WIPP Project, located in southeastern New Mexico, is being constructed as a repository for the disposal of transuranic (TRU) radioactive wastes generated by the national defense programs. The Environmental Evaluation Group (EEG) has reviewed the WIPP 1992 Performance Assessment (Sandia WIPP Performance Assessment Department, 1992). Although this performance assessment was released after the October 1992 passage of the WIPP Land Withdrawal Act (PL 102-579), the work preceded the Act. For individual and ground-water protection, calculations have been done for 1000 years post closure, whereas the US Environmental Protection Agency`s Standards (40 CFR 191) issued in 1993 require calculations for 10,000 years. The 1992 Performance Assessment continues to assimilate improved understanding of the geology and hydrogeology of the site, and evolving conceptual models of natural barriers. Progress has been made towards assessing WIPP`s compliance with the US Environmental Protection Agency`s Standards (40 CFR 191). The 1992 Performance Assessment has addressed several items of major concern to EEG, outlined in the July 1992 review of the 1991 performance assessment (Neill et al., 1992). In particular, the authors are pleased that some key results in this performance assessment deal with sensitivity of the calculated complementary cumulative distribution functions (CCDF) to alterative conceptual models proposed by EEG -- that flow in the Culebra be treated as single-porosity fracture-flow; with no sorption retardation unless substantiated by experimental data.

  16. Annual water quality data report for the Waste Isolation Pilot Plant

    SciTech Connect

    Lyon, M.L. )

    1989-04-01

    This is the fourth Annual Water Quality Data Report for the Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico. The WIPP project is operated by the United States Department of Energy (DOE) for the purpose of providing a research and development facility to demonstrate the safe disposal of transuranic radioactive wastes generated by the defense activities of the United States Government. This report presents water quality data collected from January 1988 through December 1988 from 16 designated pre-operational (WIPP facility) monitoring wells, two additional wells, and 10 privately-owned wells in the vicinity of the WIPP. Additionally, water samples were collected from the Air Intake Shaft during shaft construction activities at the WIPP. This report lists pertinent information regarding the monitoring wells sampled, sampling zone, dates pumped, and types of samples collected during 1988. Comparative data from previous samplings of all wells can be found in Uhland and Randall (1986), Uhland et al. (1987), Randall et al. (1988), as well as in this report. The data reported by the Water Quality Sampling Program in this and previous reports indicate that serial sampling is a very useful tool in determining sample representativeness from wells in the WIPP vicinity. Serial sample field chemistry data are demonstrated to be highly accurate and precise as indicated by the excellent overall average percent spike recovery values and low RPD values reported for the sampling events. Serial sample field chemistry data and laboratory water quality parameter analyses gathered by the WQSP since January 1985 are the foundation for a pre-operational water quality baseline at the WIPP. 32 refs., 66 figs., 96 tabs.

  17. Solar photocatalytic disinfection with immobilised TiO(2) at pilot-plant scale.

    PubMed

    Sordo, Carlos; Van Grieken, Rafael; Marugán, Javier; Fernández-Ibáñez, Pilar

    2010-01-01

    The photocatalytic disinfection efficiency has been investigated for two immobilized TiO(2) catalytic systems (wall reactor and fixed-bed reactor) in a solar pilot plant. Their performances have been compared with the use of a slurry reactor and the solar disinfection without catalyst. The use of photocatalytic TiO(2) wall reactors does no show clear benefits over the solar disinfection process in the absence of catalyst. The reason is that the efficiency of the solar disinfection is so high that the presence of titania in the reactor wall reduces the global efficiency due to the competition for the absorption of photons. As expected, the maximum efficiency was shown by the slurry TiO(2) reactor, due to the optimum contact between bacteria and catalyst. However, it is noticeable that the use of the fixed-bed reactor leads to inactivation rate quite close to that of the slurry, requiring comparable accumulated solar energy of about 6 kJ L(-1) to achieve a 6-log decrease in the concentration of viable bacteria and allowing a total disinfection of the water (below the detection limit of 1 CFU mL(-1)). Not only the high titania surface area of this configuration is responsible for the bacteria inactivation but the important contribution of the mechanical stress has to be considered. The main advantage of the fixed-bed TiO(2) catalyst is the outstanding stability, without deactivation effects after ten reaction cycles, being readily applicable for continuous water treatment systems.

  18. Corrosion and degradation of test materials in the U-GAS coal-gasification pilot plant

    SciTech Connect

    Yurkewycz, R.; Firestone, R.F.

    1982-10-01

    Corrosion monitoring of materials was conducted in the operating environment of the IGT U-GAS coal gasification pilot plant between 1977 and 1982. Metal and refractory specimens were exposed in the fluid bed gasifier in the freeboard section. Metal coupons were also exposed in two test locations in the product gas scrubber and venturi collection tank. Exposure times (coal feed to gasifier) were 264 h, 392 h, and 981 h. The corrosion performance of most alloys in the first exposure compared to the second and third in the U-GAS gasifier freeborad section was quite different. The more aggressive conditions produced during the first-exposure period are attributed to processing of unwashed high-sulfur coals in the steam-air gasification mode. Of the group of alloys evaluated, alloy 6B showed acceptable corrosion performance in all three exposures. Although their performance was poor in the first period, alloys N155 and IN-671 showed marked improvement in corrosion resistance during the second and third exposure periods. The same was true of cobalt-base alloy 188 which was the best performing alloy in the second and third exposures. Pack-aluminized alloys IN-800 and Type 310 showed acceptable performance. Conditions at the coupon location in the product gas scrubber (off-gas) were extremely aggressive to a range of materials exposed except titanium 50A. In the product-gas scrubber sludge tank and venturi collection tank, only carbon steel A515 showed significant attack; in some cases Types 410 and 430 incurred only mild pitting attack. Exposure in the gasifier freeboard had no significant effect on refractory specimens.

  19. Photocatalytic treatment of IGCC power station effluents in a UV-pilot plant.

    PubMed

    Durán, A; Monteagudo, J M; San Martín, I; Sánchez-Romero, R

    2009-08-15

    The aim of this work is to improve the quality of water effluents coming from an Integrated Gasification Combined Cycle (IGCC) power station to meet with future environmental legislation. This study has been made using an homogeneous photocatalytic oxidation process (UV/Fe(II)/H(2)O(2)) in a pilot plant. The efficiency of the process was determined from the analysis of the following parameters: cyanides, formates and TOC content. In the first stage, a factorial experimental design allowed to determine the influence of operation variables (initial concentration of H(2)O(2) and Fe(II), pH and temperature) on the degradation kinetics. pH was always kept in a value >9.5 during cyanides destruction to avoid gaseous HCN formation and lowered later to enhance formates degradation. Experimental kinetic constants were fitted using neural networks (NNs). Under the optimum conditions ([H(2)O(2)]=1700 ppm, [Fe(II)]=2 ppm, pH 2 after cyanides destruction, and T=30 degrees C), it is possible to degrade 100% of cyanides in 15 min and 76% of formates in 120 min. The use of an homogeneous process with UV light can offer an economical and practical alternative to heterogeneous photocatalysis for the destruction of environmental pollutants present in thermoelectric power stations effluents, since it can treat very high flowrates using a lower H(2)O(2) concentration. Furthermore, it does not require additional operations to recover the solid catalyst and regenerate it due to deactivation as occurs in heterogeneous catalysis.

  20. The advantages of a salt/bentonite backfill for Waste Isolation Pilot Plant disposal rooms

    SciTech Connect

    Butcher, B.M.; Novak, C.F. ); Jercinovic, M. )

    1991-04-01

    A 70/30 wt% salt/bentonite mixture is shown to be preferable to pure crushed salt as backfill for disposal rooms in the Waste Isolation Pilot Plant (WIPP). This report discusses several selection criteria used to arrive at this conclusion: the need for low permeability and porosity after closure, chemical stability with the surroundings, adequate strength to avoid shear erosion from human intrusion, ease of emplacement, and sorption potential for brine and radionuclides. Both salt and salt/bentonite are expected to consolidate to a final state of impermeability (i.e., {le} 10{sup {minus}18}m{sup 2}) adequate for satisfying federal nuclear regulations. Any advantage of the salt/bentonite mixture is dependent upon bentonite's potential for sorbing brine and radionuclides. Estimates suggest that bentonite's sorption potential for water in brine is much less than for pure water. While no credit is presently taken for brine sorption in salt/bentonite backfill, the possibility that some amount of inflowing brine would be chemically bound is considered likely. Bentonite may also sorb much of the plutonium, americium, and neptunium within the disposal room inventory. Sorption would be effective only if a major portion of the backfill is in contact with radioactive brine. Brine flow from the waste out through highly localized channels in the backfill would negate sorption effectiveness. Although the sorption potentials of bentonite for both brine and radionuclides are not ideal, they are distinctly beneficial. Furthermore, no detrimental aspects of adding bentonite to the salt as a backfill have been identified. These two observations are the major reasons for selecting salt/bentonite as a backfill within the WIPP. 39 refs., 16 figs., 6 tabs.

  1. Oil refinery hazardous effluents minimization by membrane filtration: An on-site pilot plant study.

    PubMed

    Santos, Bruno; Crespo, João G; Santos, Maria António; Velizarov, Svetlozar

    2016-10-01

    Experiments for treating two different types of hazardous oil refinery effluents were performed in order to avoid/minimize their adverse impacts on the environment. First, refinery wastewater was subjected to ultrafiltration using a ceramic membrane, treatment, which did not provide an adequate reduction of the polar oil and grease content below the maximal contaminant level allowed. Therefore the option of reducing the polar oil and grease contamination at its main emission source point in the refinery - the spent caustic originating from the refinery kerosene caustic washing unit - using an alkaline-resistant nanofiltration polymeric membrane treatment was tested. It was found that at a constant operating pressure and temperature, 99.9% of the oil and grease and 97.7% of the COD content were rejected at this emission point. Moreover, no noticeable membrane fouling or permeate flux decrease were registered until a spent caustic volume concentration factor of 3. These results allow for a reuse of the purified permeate in the refinery operations, instead of a fresh caustic solution, which besides the improved safety and environmentally related benefits, can result in significant savings of 1.5 M€ per year at the current prices for the biggest Portuguese oil refinery. The capital investment needed for nanofiltration treatment of the spent caustic is estimated to be less than 10% of that associated with the conventional wet air oxidation treatment of the spent caustic that is greater than 9 M€. The payback period was estimated to be 1.1 years. The operating costs for the two treatment options are similar, but the reuse of the nanofiltration spent caustic concentrate for refinery pH control applications can further reduce the operating expenditures. Overall, the pilot plant results obtained and the process economics evaluation data indicate a safer, environmentally friendly and highly competitive solution offered by the proposed nanofiltration treatment, thus

  2. The Waste Isolation Pilot Plant: A Success Story with International Cooperation

    SciTech Connect

    Matthews, M.

    2002-02-26

    The U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) administers and operates the Waste Isolation Pilot Plant (WIPP) site, which hosts a deep geologic repository for safe disposal of U.S. defense-related TRU waste and is located 42 kilometers (km) east of Carlsbad, New Mexico. CBFO also manages the National Transuranic Waste Program (NTP), which oversees TRU waste management from generation to disposal. The WIPP began receiving waste in March 1999. In some areas of broad international interest, the CBFO has developed a leading expertise through its 25-year WIPP repository and TRU waste characterization activities. In addition to participating in relevant and beneficial experiments, the CBFO will provide the international community convenient access to this information by sponsoring and hosting symposia and workshops on relevant topics and by participation in international waste management organizations and topical meetings. In recognition of the successes at WIPP, the Inter national Atomic Energy Agency (IAEA) has designated WIPP as an International Center of Excellence and part of IAEA's Network of Centers of Excellence. The IAEA will foster cooperative training in and demonstration of waste disposal technologies in underground research facilities (URFs).such as WIPP. The CBFO, supported by its Science Advisor, has agreed to exchange scientific information with eight foreign radioactive waste management organizations, and three more national radioactive waste management and disposal organizations have expressed interest in similar agreements. These activities result in the cost-effective acquisition of scientific information in support of increased WIPP facility operational and post-closure assurance and reliability. It also demonstrates the CBFO's intent and resolve to honor international commitments and obligations.

  3. Pilot Plant Program for the AED Advanced Coal Cleaning System. Phase II. Interim final report

    SciTech Connect

    Not Available

    1980-08-01

    Advanced Energy Dynamics, Inc. (AED), has developed a proprietary coal cleaning process which employs a combination of ionization and electrostatic separation to remove both sulfur and ash from dry pulverized coal. The Ohio Department of Energy sponsored the first part of a program to evaluate, develop, and demonstrate the process in a continuous-flow pilot plant. Various coals used by Ohio electric utilities were characterized and classified, and sulfur reduction, ash reduction and Btu recovery were measured. Sulfur removal in various coals ranged from 33 to 68% (on a Btu basis). Ash removal ranged from 17 to 59% (on a Btu basis). Ash removal of particles greater than 53 microns ranged from 46 to 88%. Btu recovery ranged from 90 to 97%. These results, especially the large percentage removal of ash particles greater than 53 microns, suggest that the AED system can contribute materially to improved boiler performance and availability. The study indicated the following potential areas for commercial utilization of the AED process: installation between the pulverizer and boiler of conventional coal-fired power utilities; reclamation of fine coal refuse; dry coal cleaning to supplement, and, if necessary, to take the place of conventional coal cleaning; upgrading coal used in: (1) coal-oil mixtures, (2) gasification and liquefaction processes designed to handle pulverized coal; and (3) blast furnaces for making steel, as a fuel supplement to the coke. Partial cleaning of coking coal blends during preheating may also prove economically attractive. Numerous other industrial processes which use pulverized coal such as the production of activated carbon and direct reduction of iron ore may also benefit from the use of AED coal cleaning.

  4. Waste Isolation Pilot Plant Geotechnical Analysis Report for July 2004 - June 2005, Volume 1

    SciTech Connect

    Washington TRU Solutions LLC

    2006-04-03

    This Geotechnical Analysis Report (GAR) presents and interprets the geotechnical data from the underground excavations at the Waste Isolation Pilot Plant (WIPP). The data, which are obtained as part of a regular monitoring program, are used to characterize conditions, to compare actual performance to the design assumptions, and to evaluate and forecast the performance of the underground excavations. GARs have been available to the public since 1983. During the Site and Preliminary Design Validation (SPDV) Program, the architect/engineer for the project produced these reports quarterly to document the geomechanical performance during and immediately after early excavations of the underground facility. Since the completion of the construction phase of the project in 1987, the management and operating contractor for the facility has prepared these reports annually. This report describes the performance and condition of selected areas from July 1, 2004, to June 30, 2005. It is divided into nine chapters. Chapter 1 provides background information on WIPP, its mission, and the purpose and scope of the Geomechanical Monitoring Program. Chapter 2 describes the local and regional geology of the WIPP site. Chapters 3 and 4 describe the geomechanical instrumentation in the shafts and shaft stations, present the data collected by that instrumentation, and provide interpretation of these data. Chapters 5 and 6 present the results of geomechanical monitoring in the two main portions of the WIPP underground (the access drifts and the waste disposal area). Chapter 7 discusses the results of the Geoscience Program, which include fracture mapping and borehole observations. Chapter 8 summarizes the results of the geomechanical monitoring and compares the current excavation performance to the design requirements. Chapter 9 lists the references and bibliography.

  5. Waste Isolation PIlot Plant Geotechnical Analysis Report for July 2005 - June 2006, Volume 1

    SciTech Connect

    Washington TRU Solutions LLC

    2006-04-03

    This Geotechnical Analysis Report (GAR) presents and interprets geotechnical data from the underground excavations at the Waste Isolation Pilot Plant (WIPP). The data, which are obtained as part of a regular monitoring program, are used to characterize conditions, to compare actual performance to the design assumptions, and to evaluate and forecast the performance of the underground excavations. GARs have been available to the public since 1983. During the Site and Preliminary Design Validation (SPDV) Program, the architect/engineer for the project produced these reports quarterly to document the geomechanical performance during and immediately after early excavations of the underground facility. Since completion of the construction phase of the project in 1987, the management and operating contractor for the facility has prepared these reports annually. This report describes the performance and condition of selected areas from July 1, 2005, to June 30, 2006. It is divided into nine chapters. Chapter 1 provides background information on WIPP, its mission, and the purpose and scope of the geomechanical monitoring program. Chapter 2 describes the local and regional geology of the WIPP site. Chapters 3 and 4 describe the geomechanical instrumentation in the shafts and shaft stations, present the data collected by that instrumentation, and provide interpretation of these data. Chapters 5 and 6 present the results of geomechanical monitoring in the two main portions of the WIPP underground (the access drifts and the waste disposal area). Chapter 7 discusses the results of the Geoscience Program, which include fracture mapping and borehole observations. Chapter 8 summarizes the results of geomechanical monitoring and compares the current excavation performance to the design requirements. Chapter 9 lists references.

  6. Probability of failure of the waste hoist brake system at the Waste Isolation Pilot Plant (WIPP)

    SciTech Connect

    Greenfield, M.A.; Sargent, T.J. |

    1998-01-01

    In its most recent report on the annual probability of failure of the waste hoist brake system at the Waste Isolation Pilot Plant (WIPP), the annual failure rate is calculated to be 1.3E({minus}7)(1/yr), rounded off from 1.32E({minus}7). A calculation by the Environmental Evaluation Group (EEG) produces a result that is about 4% higher, namely 1.37E({minus}7)(1/yr). The difference is due to a minor error in the US Department of Energy (DOE) calculations in the Westinghouse 1996 report. WIPP`s hoist safety relies on a braking system consisting of a number of components including two crucial valves. The failure rate of the system needs to be recalculated periodically to accommodate new information on component failure, changes in maintenance and inspection schedules, occasional incidents such as a hoist traveling out-of-control, either up or down, and changes in the design of the brake system. This report examines DOE`s last two reports on the redesigned waste hoist system. In its calculations, the DOE has accepted one EEG recommendation and is using more current information about the component failures rates, the Nonelectronic Parts Reliability Data (NPRD). However, the DOE calculations fail to include the data uncertainties which are described in detail in the NPRD reports. The US Nuclear Regulatory Commission recommended that a system evaluation include mean estimates of component failure rates and take into account the potential uncertainties that exist so that an estimate can be made on the confidence level to be ascribed to the quantitative results. EEG has made this suggestion previously and the DOE has indicated why it does not accept the NRC recommendation. Hence, this EEG report illustrates the importance of including data uncertainty using a simple statistical example.

  7. Creating a baseline radiological standard for the waste isolation pilot plant underground.

    PubMed

    Chiou, Hung-Cheng; Hayes, Robert

    2004-09-01

    The Waste Isolation Pilot Plant (WIPP) is a deep underground geological repository for defense transuranic wastes. The creation of a full baseline radiological standard for the WIPP underground is essential in order to evaluate and account for the influence of the naturally occurring radioactive materials, and to prepare for any suspected contamination or the very unlikely event of a real accident scenario. In this report, we describe the establishment of the baseline information using the gamma background dose rate measurements and the salt rib smears of surface removable alpha and beta activities throughout the WIPP underground. The average background gamma dose rate in the WIPP underground is 8.27 x 10(-9) +/- 1.65 x 10(-9) Gy/h while the gamma dose rate on the WIPP surface is 3.46 x 10(-8) +/- 1.65 x 10(-9) Gy/h. The overall surface average alpha activity in the underground is 8.52 x 10(-5) +/- 1.22 x 10(-4) Bq/cm2 (at 1sigma level) with the minimum detectable activity (MDA) of 4.81 x 10(-4) Bq/cm2. The overall surface average beta activity is 8.25 x 10(-4) +/- 8.17 x 10(-4) Bq/cm2 (at 1sigma level) with the MDA of 3.19 x 10(-3) Bq/cm2. This baseline standard will be beneficial to the overall WIPP operational facility, ensuring the worker safety and adding to public confidence in the operation of the WIPP.

  8. Results from simulated contact-handled transuranic waste experiments at the Waste Isolation Pilot Plant

    SciTech Connect

    Molecke, M.A.; Sorensen, N.R.; Krumhansl, J.L.

    1993-12-31

    We conducted in situ experiments with nonradioactive, contact-handled transuranic (CH TRU) waste drums at the Waste Isolation Pilot Plant (WIPP) facility for about four years. We performed these tests in two rooms in rock salt, at WIPP, with drums surrounded by crushed salt or 70 wt % salt/30 wt % bentonite clay backfills, or partially submerged in a NaCl brine pool. Air and brine temperatures were maintained at {approximately}40C. These full-scale (210-L drum) experiments provided in situ data on: backfill material moisture-sorption and physical properties in the presence of brine; waste container corrosion adequacy; and, migration of chemical tracers (nonradioactive actinide and fission product simulants) in the near-field vicinity, all as a function of time. Individual drums, backfill, and brine samples were removed periodically for laboratory evaluations. Waste container testing in the presence of brine and brine-moistened backfill materials served as a severe overtest of long-term conditions that could be anticipated in an actual salt waste repository. We also obtained relevant operational-test emplacement and retrieval experience. All test results are intended to support both the acceptance of actual TRU wastes at the WIPP and performance assessment data needs. We provide an overview and technical data summary focusing on the WIPP CH TRU envirorunental overtests involving 174 waste drums in the presence of backfill materials and the brine pool, with posttest laboratory materials analyses of backfill sorbed-moisture content, CH TRU drum corrosion, tracer migration, and associated test observations.

  9. FRACTIONAL CRYSTALLIZATION OF HANFORD SINGLE SHELL TANK (SST) WASTES FROM CONCEPT TO PILOT PLANT

    SciTech Connect

    GENIESSE, D.J.; NELSON, E.A.; HAMILTON, D.W.; MAJORS, J.H.; NORDAHL, T.K.

    2006-12-08

    The Hanford site has 149 underground single-shell tanks (SST) storing mostly soluble, multi-salt mixed wastes resulting from Cold War era weapons material production. These wastes must be retrieved and the salts immobilized before the tanks can be closed to comply with an overall site-closure consent order entered into by the US Department of Energy, the Environmental Protection Agency, and the State of Washington. Water will be used to retrieve the wastes and the resulting solution will be pumped to a proposed pretreatment process where a high-curie (primarily {sup 137}Cs) waste fraction will be separated from the other waste constituents. The separated waste streams will then be vitrified to allow for safe storage as an immobilized high-level waste, or low-level waste, borosilicate glass. Fractional crystallization, a common unit operation for production of industrial chemicals and pharmaceuticals, was proposed as the method to separate the salt wastes; it works by evaporating excess water until the solubilities of various species in the solution are exceeded (the solubility of a particular species depends on its concentration, temperature of the solution, and the presence of other ionic species in the solution). By establishing the proper conditions, selected pure salts can be crystallized and separated from the radioactive liquid phase. The aforementioned parameters, along with evaporation rate, proper agitation, and residence time, determine nucleation and growth kinetics and the resulting habit and size distribution of the product crystals. These crystals properties are important considerations for designing the crystallizer and solid/liquid separation equipment. A structured program was developed to (a) demonstrate that fractional crystallization could be used to pre-treat Hanford tank wastes and (b) provide data to develop a pilot plant design.

  10. 1997 annual ground control operating plan for the Waste Isolation Pilot Plant

    SciTech Connect

    1997-02-01

    This plan presents background information and a working guide to assist Mine Operations and Engineering in developing strategies for addressing ground control issues at the Waste Isolation Pilot Plant (WIPP). With the anticipated receipt of waste in late 1997, this document provides additional detail to Panel 1 activities and options. The plan also serves as a foundation document for development and revision of the annual long-term ground control plan. Section 2.0 documents the current status of all underground excavations with respect to location, geology, geometry, age, ground support, operational use, projected life, and physical conditions. Section 3.0 presents the methods used to evaluate ground conditions, including visual observations of the roof, ribs, and floor, inspection of observation holes, and review of instrumentation data. Section 4.0 lists several ground support options and specific applications of each. Section 5.0 discusses remedial ground control measures that have been implemented to date. Section 6.0 presents projections and recommendations for ground control actions based on the information in Sections 2.0 through 5.0 of this plan and on a rating of the critical nature of each specific area. Section 7.0 presents a summary statement, and Section 8.0 includes references. Appendix A provides an overview and critique of ground control systems that have been, or may be, used at the site. Because of the dynamic nature of the underground openings and associated geotechnical activities, this plan will be revised as additional data are incorporated.

  11. WASTE ISOLATION PILOT PLANT (WIPP): THE NATIONS' SOLUTION TO NUCLEAR WASTE STORAGE AND DISPOSAL ISSUES

    SciTech Connect

    Lopez, Tammy Ann

    2014-07-17

    In the southeastern portion of my home state of New Mexico lies the Chihuahauan desert, where a transuranic (TRU), underground disposal site known as the Waste Isolation Pilot Plant (WIPP) occupies 16 square miles. Full operation status began in March 1999, the year I graduated from Los Alamos High School, in Los Alamos, NM, the birthplace of the atomic bomb and one of the nation’s main TRU waste generator sites. During the time of its development and until recently, I did not have a full grasp on the role Los Alamos was playing in regards to WIPP. WIPP is used to store and dispose of TRU waste that has been generated since the 1940s because of nuclear weapons research and testing operations that have occurred in Los Alamos, NM and at other sites throughout the United States (U.S.). TRU waste consists of items that are contaminated with artificial, man-made radioactive elements that have atomic numbers greater than uranium, or are trans-uranic, on the periodic table of elements and it has longevity characteristics that may be hazardous to human health and the environment. Therefore, WIPP has underground rooms that have been carved out of 2,000 square foot thick salt formations approximately 2,150 feet underground so that the TRU waste can be isolated and disposed of. WIPP has operated safely and successfully until this year, when two unrelated events occurred in February 2014. With these events, the safety precautions and measures that have been operating at WIPP for the last 15 years are being revised and improved to ensure that other such events do not occur again.

  12. Krypton-81 in groundwater of the Culebra Dolomite near the Waste Isolation Pilot Plant, New Mexico

    NASA Astrophysics Data System (ADS)

    Sturchio, Neil C.; Kuhlman, Kristopher L.; Yokochi, Reika; Probst, Peter C.; Jiang, Wei; Lu, Zheng-Tian; Mueller, Peter; Yang, Guo-Min

    2014-05-01

    The Waste Isolation Pilot Plant (WIPP) in New Mexico is the first geologic repository for disposal of transuranic nuclear waste from defense-related programs of the US Department of Energy. It is constructed within halite beds of the Permian-age Salado Formation. The Culebra Dolomite, confined within Rustler Formation evaporites overlying the Salado Formation, is a potential pathway for radionuclide transport from the repository to the accessible environment in the human-disturbed repository scenario. Although extensive subsurface characterization and numerical flow modeling of groundwater has been done in the vicinity of the WIPP, few studies have used natural isotopic tracers to validate the flow models and to better understand solute transport at this site. The advent of Atom-Trap Trace Analysis (ATTA) has enabled routine measurement of cosmogenic 81Kr (half-life 229,000 yr), a near-ideal tracer for long-term groundwater transport. We measured 81Kr in saline groundwater sampled from two Culebra Dolomite monitoring wells near the WIPP site, and compared 81Kr model ages with reverse particle-tracking results of well-calibrated flow models. The 81Kr model ages are ~ 130,000 and ~ 330,000 yr for high-transmissivity and low-transmissivity portions of the formation, respectively. Compared with flow model results which indicate a relatively young mean hydraulic age (~ 32,000 yr), the 81Kr model ages imply substantial physical attenuation of conservative solutes in the Culebra Dolomite and provide limits on the effective diffusivity of contaminants into the confining aquitards.

  13. Assessment of potential doses to workers during postulated accident conditions at the Waste Isolation Pilot Plant

    SciTech Connect

    Hoover, M.D.; Farrell, R.F.; Newton, G.J.

    1995-12-01

    The recent 1995 WIPP Safety Analysis Report (SAR) Update provided detailed analyses of potential radiation doses to members of the public at the site boundary during postulated accident scenarios at the U.S. Department of Energy`s Waste Isolation Pilot Plant (WIPP). The SAR Update addressed the complete spectrum of potential accidents associated with handling and emplacing transuranic waste at WIPP, including damage to waste drums from fires, punctures, drops, and other disruptions. The report focused on the adequacy of the multiple layers of safety practice ({open_quotes}defense-in-depth{close_quotes}) at WIPP, which are designed to (1) reduce the likelihood of accidents and (2) limit the consequences of those accidents. The safeguards which contribute to defense-in-depth at WIPP include a substantial array of inherent design features, engineered controls, and administrative procedures. The SAR Update confirmed that the defense-in-depth at WIPP is adequate to assure the protection of the public and environment. As a supplement to the 1995 SAR Update, we have conducted additional analyses to confirm that these controls will also provide adequate protection to workers at the WIPP. The approaches and results of the worker dose assessment are summarized here. In conformance with the guidance of DOE Standard 3009-94, we emphasize that use of these evaluation guidelines is not intended to imply that these numbers constitute acceptable limits for worker exposures under accident conditions. However, in conjunction with the extensive safety assessment in the 1995 SAR Update, these results indicate that the Carlsbad Area Office strategy for the assessment of hazards and accidents assures the protection of workers, members of the public, and the environment.

  14. No-migration variance petition for the Waste Isolation Pilot Plant

    SciTech Connect

    Carnes, R.G.; Hart, J.S. ); Knudtsen, K. )

    1990-01-01

    The Waste Isolation Pilot Plant (WIPP) is a US Department of Energy (DOE) project to provide a research and development facility to demonstrate the safe disposal of radioactive waste resulting from US defense activities and programs. The DOE is developing the WIPP facility as a deep geologic repository in bedded salt for transuranic (TRU) waste currently stored at or generated by DOE defense installations. Approximately 60 percent of the wastes proposed to be emplaced in the WIPP are radioactive mixed wastes. Because such mixed wastes contain a hazardous chemical component, the WIPP is subject to requirements of the Resource Conservation and Recovery Act (RCRA). In 1984 Congress amended the RCRA with passage of the Hazardous and Solid Waste Amendments (HSWA), which established a stringent regulatory program to prohibit the land disposal of hazardous waste unless (1) the waste is treated to meet treatment standards or other requirements established by the Environmental Protection Agency (EPA) under {section}3004(n), or (2) the EPA determines that compliance with the land disposal restrictions is not required in order to protect human health and the environment. The DOE WIPP Project Office has prepared and submitted to the EPA a no-migration variance petition for the WIPP facility. The purpose of the petition is to demonstrate, according to the requirements of RCRA {section}3004(d) and 40 CFR {section}268.6, that to a reasonable degree of certainty, there will be no migration of hazardous constituents from the WIPP facility for as long as the wastes remain hazardous. This paper provides an overview of the petition and describes the EPA review process, including key issues that have emerged during the review. 5 refs.

  15. Krypton-81 in groundwater of the Culebra Dolomite near the Waste Isolation Pilot Plant, New Mexico.

    PubMed

    Sturchio, Neil C; Kuhlman, Kristopher L; Yokochi, Reika; Probst, Peter C; Jiang, Wei; Lu, Zheng-Tian; Mueller, Peter; Yang, Guo-Min

    2014-05-01

    The Waste Isolation Pilot Plant (WIPP) in New Mexico is the first geologic repository for disposal of transuranic nuclear waste from defense-related programs of the US Department of Energy. It is constructed within halite beds of the Permian-age Salado Formation. The Culebra Dolomite, confined within Rustler Formation evaporites overlying the Salado Formation, is a potential pathway for radionuclide transport from the repository to the accessible environment in the human-disturbed repository scenario. Although extensive subsurface characterization and numerical flow modeling of groundwater has been done in the vicinity of the WIPP, few studies have used natural isotopic tracers to validate the flow models and to better understand solute transport at this site. The advent of Atom-Trap Trace Analysis (ATTA) has enabled routine measurement of cosmogenic (81)Kr (half-life 229,000 yr), a near-ideal tracer for long-term groundwater transport. We measured (81)Kr in saline groundwater sampled from two Culebra Dolomite monitoring wells near the WIPP site, and compared (81)Kr model ages with reverse particle-tracking results of well-calibrated flow models. The (81)Kr model ages are ~130,000 and ~330,000 yr for high-transmissivity and low-transmissivity portions of the formation, respectively. Compared with flow model results which indicate a relatively young mean hydraulic age (~32,000 yr), the (81)Kr model ages imply substantial physical attenuation of conservative solutes in the Culebra Dolomite and provide limits on the effective diffusivity of contaminants into the confining aquitards.

  16. Continuous Improvement and the Safety Case for the Waste Isolation Pilot Plant Geologic Repository - 13467

    SciTech Connect

    Van Luik, Abraham; Patterson, Russell; Nelson, Roger; Leigh, Christi

    2013-07-01

    The Waste Isolation Pilot Plant (WIPP) is a geologic repository 2150 feet (650 m) below the surface of the Chihuahuan desert near Carlsbad, New Mexico. WIPP permanently disposes of transuranic waste from national defense programs. Every five years, the U.S. Department of Energy (DOE) submits an application to the U.S. Environmental Protection Agency (EPA) to request regulatory-compliance re-certification of the facility for another five years. Every ten years, DOE submits an application to the New Mexico Environment Department (NMED) for the renewal of its hazardous waste disposal permit. The content of the applications made by DOE to the EPA for re-certification, and to the NMED for permit-renewal, reflect any optimization changes made to the facility, with regulatory concurrence if warranted by the nature of the change. DOE points to such changes as evidence for its having taken seriously its 'continuous improvement' operations and management philosophy. Another opportunity for continuous improvement is to look at any delta that may exist between the re-certification and re-permitting cases for system safety and the consensus advice on the nature and content of a safety case as being developed and published by the Nuclear Energy Agency's Integration Group for the Safety Case (IGSC) expert group. DOE at WIPP, with the aid of its Science Advisor and teammate, Sandia National Laboratories, is in the process of discerning what can be done, in a reasonably paced and cost-conscious manner, to continually improve the case for repository safety that is being made to the two primary regulators on a recurring basis. This paper will discuss some aspects of that delta and potential paths forward to addressing them. (authors)

  17. Geohydrology of the proposed Waste Isolation Pilot Plant site, Los Medanos area, southeastern New Mexico

    USGS Publications Warehouse

    Mercer, Jerry W.

    1983-01-01

    Geohydrologic data have been collected in the Los Medanos area at the U.S. Department of Energy 's proposed Waste Isolation Pilot Plant (WIPP) site in southeastern New Mexico since 1975 as part of an intensive study evaluating the feasibility of storing defense-associated nuclear wastes within the bedded salt of the Salado Formation of Permian age. Drilling and hydrologic testing have identified three principal water-producing zones above the salt, including the Rustler-Salado Formational contact and the Culebra and Magenta Dolomite Members of the Permian Rustler Formation. Below the bedded salt there is another water-bearing zone, the channel sandstones of the Bell Canyon formation of the Permian Delaware Mountain Group. Most data collected from 33 hydrologic test holes indicate that the water-bearing zones are characterized by low transmissivities and contain slightly saline to briny water. Data collected from drill-stem tests in the Bell Canyon Formation indicate the channel sandstones have hydraulic conductivities ranging from 0.02 to 0.36 feet per day grade vertically and laterally into siltstones and shales of very low permeability. The Rustler Formation contains the principal water-producing zones identified at the WIPP site. The Rustler-Salado formational contact has the least transmissivity, ranging from 0.00003 to 0.003 feet squared per day. The Culebra Dolomite is the most productive unit at the WIPP site with transmissivities ranging from 0.001 to 73 feet squared per day; the greater values result from fracturing in the dolomite created by dissolution of underlying halite. Minute vertical permeabilities prevent movement of water between hydrologic units. (USGS)

  18. NO{sub x} Abatement Pilot Plant 90-day test results report

    SciTech Connect

    McCray, J.A.; Boardman, R.D.

    1991-08-30

    High-level radioactive liquid wastes produced during nuclear fuel reprocessing at the Idaho Chemical Processing Plant are calcined in the New Waste Calcining Facility (NWCF) to provide both volume reduction and a more stable waste form. Because a large component of the HLW is nitric acid, high levels of oxides of nitrogen (NO{sub x}) are produced in the process and discharged to the environment via the calciner off-gas. The NO{sub x} abatement program is required by the new Fuel Processing Restoration (FPR) project permit to construct to reduce NO{sub x} emissions from the NWCF. Extensive research and development has indicated that the selective catalytic reduction (SCR) process is the most promising technology for treating the NWCF off-gas. Pilot plant tests were performed to determine the compatibility of the SCR process with actual NWCF off-gas. Test results indicate that the SCR process is a viable method for abating the NO{sub x} from the NWCF off-gas. Reduction efficiencies over 95% can be obtained, with minimal amounts of ammonia slip, provided favorable operating conditions exist. Two reactors operated with series flow will provide optimum reduction capabilities. Typical operation should be performed with a first reactor stage gas space velocity of 20,000 hr{sup {minus}1} and an inlet temperature of 320{degrees}C. The first stage exhaust NO{sub x} concentration will then dictate the parameter settings for the second stage. Operation should always strive for a peak reactor temperature of 520{degrees}C in both reactors, with minimal NH{sub 3} slip from the second reactor. Frequent fluctuations in the NWCF off-gas NO{sub x} concentration will require a full-scale reduction facility that is versatile and quick-responding. Sudden changes in NWCF off-gas NO{sub x} concentrations will require quick detection and immediate response to avoid reactor bed over-heating and/or excessive ammonia slip.

  19. Year-round phytofiltration lagoon assessment using Pistia stratiotes within a pilot-plant scale biorefinery.

    PubMed

    Olguín, Eugenia J; García-López, Daniel A; González-Portela, Ricardo E; Sánchez-Galván, Gloria

    2017-08-15

    Phytofiltration lagoons are phytoremediation technologies suitable for tropical and sub-tropical regions requiring cost-effective and echo-friendly technologies. A biorefinery of fourth generation has been implemented at pilot plant level in Xalapa, Mexico, and the phytofiltration lagoon, being the first module for provision of treated water and plant biomass for biofuel production plays a key role. The aim of this work was to evaluate the performance of such phytofiltration lagoon with a working volume of 13,000 L for the removal of nutrients from an urban river polluted with domestic wastewater and the biomass productivity of the macrophyte Pistia stratiotes, during five different experimental periods, comprising 42 days each one. The maximum absolute growth rates (AGR, gdwday(-1)) registered for P. stratiotes during the Aug-Oct '15 and the March-Apr '16 and Apr-May '16 period were in the range of 13.51±2.66 to 16.54±2.02gdwday(-1). The average biomass productivity was 5.808gdwm(-2)day(-1). Productivities were similar during the periods of Aug-Oct '15, Mar-Apr '16 and Apr-May '16 and significantly higher (p<0.05) than those registered in Oct-Nov '15 and Jan-Feb '16. Removal percentages of COD and nutrients varied according to the season. COD was in the range of 47.82±39.3% to 88.00±15.0%. Ammonium N was in the range of 76.78±21% to 98.79±0.9%. Nitrates were removed in the range of 16.92±64%. to 97.14±4.5%. Finally, phosphates were removed very effectively, from 73.72±18.5% to 92.89±4.3%. A hydraulic retention time of 7 days was enough for the effective treatment of the water from the polluted river. It was concluded that the phytofiltration lagoon with P. stratiotes is very feasible within the biorefinery for providing biomass year-round and for treating the polluted water very effectively.

  20. Fate of NDMA precursors through an MBR-NF pilot plant for urban wastewater reclamation and the effect of changing aeration conditions.

    PubMed

    Mamo, Julian; Insa, Sara; Monclús, Hèctor; Rodríguez-Roda, Ignasi; Comas, Joaquim; Barceló, Damià; Farré, Maria José

    2016-10-01

    The removal of N-nitrosodimethylamine (NDMA) formation potential through a membrane bioreactor (MBR) coupled to a nanofiltration (NF) pilot plant that treats urban wastewater is investigated. The results are compared to the fate of the individual NDMA precursors detected: azithromycin, citalopram, erythromycin, clarithromycin, ranitidine, venlafaxine and its metabolite o-desmethylvenlafaxine. Specifically, the effect of dissolved oxygen in the aerobic chamber of the MBR pilot plant on the removal of NDMA formation potential (FP) and individual precursors is studied. During normal aerobic operation, implying a fully nitrifying system, the MBR was able to reduce NDMA precursors above 94%, however this removal percentage was reduced to values as low as 72% when changing the conditions to minimize nitrification. Removal decreased also for azithromycin (68-59%), citalopram (31-17%), venlafaxine (35-15%) and erythromycin (61-16%) on average during nitrifying versus non-nitrifying conditions. The removal of clarithromycin, o-desmethylvenlafaxine and ranitidine could not be correlated with the nitrification inhibition, as it varied greatly during the experiment time. The MBR pilot plant is coupled to a nanofiltration (NF) system and the results on the rejection of both, NDMA FP and individual precursors, through this system was above 90%. Finally, results obtained for the MBR pilot plant are compared to the percentage of removal by a conventional full scale biological wastewater treatment plant (WWTP) fed with the same influent. During aerobic operation, the removal of NDMA FP by the MBR pilot plant was similar to the full scale WWTP.

  1. A Pilot Study Investigating the Effects of Advanced Nuclear Power Plant Control Room Technologies: Methods and Qualitative Results

    SciTech Connect

    BLanc, Katya Le; Powers, David; Joe, Jeffrey; Spielman, Zachary; Rice, Brandon; Fitzgerald, Kirk

    2015-08-01

    Control room modernization is an important part of life extension for the existing light water reactor fleet. None of the 99 currently operating commercial nuclear power plants in the U.S. has completed a full-scale control room modernization to date. Nuclear power plant main control rooms for the existing commercial reactor fleet remain significantly analog, with only limited digital modernizations. Upgrades in the U.S. do not achieve the full potential of newer technologies that might otherwise enhance plant and operator performance. The goal of the control room upgrade benefits research is to identify previously overlooked benefits of modernization, identify candidate technologies that may facilitate such benefits, and demonstrate these technologies through human factors research. This report describes a pilot study to test upgrades to the Human Systems Simulation Laboratory at INL.

  2. Design and operation of a mini-pilot plant for the removal of sulfur from coal using the perchloroethylene process

    SciTech Connect

    Thome, T.L.; Fullerton, K.L.; Lee, S.

    1994-12-31

    A mini-pilot plant has been designed and fabricated to study the removal of sulfur from coal using perchloroethylene in a continuous process. Perchloroethylene solvent is used in a recycle process stream to perform both physical and chemical cleaning of finely crushed coal. Organic sulfur is removed in an extraction stage using perchloroethylene at atmospheric pressure. Physical removal of pyrites and minerals takes place in a float/sink apparatus in which perchloroethylene is used as a heavy medium. The plant is used to study process efficiency, control, and to provide scale-up data. The process variables studied will include type of coal, solvent-to-coal ratio, and extraction time among others. Design of the plant using bench-scale data will be discussed. Unit operations will be discussed, including extraction, heavy medium separation, screen separation, and drying.

  3. MBM fuel feeding system design and evaluation for FBG pilot plant

    SciTech Connect

    Campbell, William A.; Fonstad, Terry; Pugsley, Todd; Gerspacher, Regan

    2012-06-15

    Highlights: Black-Right-Pointing-Pointer A 1-5 g/s fuel feeding system for pilot scale FBG was designed, built and tested. Black-Right-Pointing-Pointer Multiple conveying stages improve pressure balancing, flow control and stability. Black-Right-Pointing-Pointer Secondary conveyor stage reduced output irregularity from 47% to 15%. Black-Right-Pointing-Pointer Pneumatic air sparging effective in dealing with poor flow ability of MBM powder. Black-Right-Pointing-Pointer Pneumatic injection port plugs with char at gasification temperature of 850 Degree-Sign C. - Abstract: A biomass fuel feeding system has been designed, constructed and evaluated for a fluidized bed gasifier (FBG) pilot plant at the University of Saskatchewan (Saskatoon, SK, Canada). The system was designed for meat and bone meal (MBM) to be injected into the gasifier at a mass flow-rate range of 1-5 g/s. The designed system consists of two stages of screw conveyors, including a metering stage which controlled the flow-rate of fuel, a rotary airlock and an injection conveyor stage, which delivered that fuel at a consistent rate to the FBG. The rotary airlock which was placed between these conveyors, proved unable to maintain a pressure seal, thus the entire conveying system was sealed and pressurized. A pneumatic injection nozzle was also fabricated, tested and fitted to the end of the injection conveyor for direct injection and dispersal into the fluidized bed. The 150 mm metering screw conveyor was shown to effectively control the mass output rate of the system, across a fuel output range of 1-25 g/s, while the addition of the 50 mm injection screw conveyor reduced the irregularity (error) of the system output rate from 47% to 15%. Although material plugging was found to be an issue in the inlet hopper to the injection conveyor, the addition of air sparging ports and a system to pulse air into those ports was found to successfully eliminate this issue. The addition of the pneumatic injection nozzle

  4. Development of a moving bed pilot plant for thermochemical energy storage with CaO/Ca(OH)2

    NASA Astrophysics Data System (ADS)

    Schmidt, Matthias; Gollsch, Marie; Giger, Franz; Grün, Manfred; Linder, Marc

    2016-05-01

    Thermochemical energy storage, for instance with Ca(OH)2, offers high energy densities at low material costs and could therefore be a promising storage alternative for CSP-plants. Yet, due to the low thermal conductivity of the Ca(OH)2 material large storage capacities operated in an indirectly heated fixed bed also require large heat exchangers. In other words the fixed bed concept somehow opposes one of the main advantages of Ca(OH)2, its low material costs. One approach to overcome this issue is to detach the costly reactor with the heat exchanger (power) from the storage material (capacity). This can be accomplished by a moving bed concept where the material moves through the reactor. Therefore a novel moving bed pilot plant was developed within the consortium of the European project TCS Power. The pilot plant was set into operation and revealed important information about the material flow through the reactor and the operation strategy of a moving bed concept.

  5. Pharmaceuticals and pesticides in reclaimed water: Efficiency assessment of a microfiltration-reverse osmosis (MF-RO) pilot plant.

    PubMed

    Rodriguez-Mozaz, Sara; Ricart, Marta; Köck-Schulmeyer, Marianne; Guasch, Helena; Bonnineau, Chloe; Proia, Lorenzo; de Alda, Miren Lopez; Sabater, Sergi; Barceló, Damià

    2015-01-23

    Water reuse is becoming a common practice in several areas in the world, particularly in those impacted by water scarcity driven by climate change and/or by rising human demand. Since conventional wastewater treatment plants (WWTPs) are not able to efficiently remove many organic contaminants and pathogens, more advanced water treatment processes should be applied to WWTP effluents for water reclamation purposes. In this work, a pilot plant based on microfiltration (MF) followed by reverse osmosis (RO) filtration was applied to the effluents of an urban WWTP. Both the WWTP and the pilot plant were investigated with regards to the removal of a group of relevant contaminants widely spread in the environment: 28 pharmaceuticals and 20 pesticides. The combined treatment by the MF-RO system was able to quantitatively remove the target micropollutants present in the WWTP effluents to values either in the low ng/L range or below limits of quantification. Monitoring of water quality of reclaimed water and water reclamation sources is equally necessary to design the most adequate treatment procedures aimed to water reuse for different needs.

  6. The use of mathematical modeling and pilot plant testing to develop a new biological phosphorus and nitrogen removal process

    SciTech Connect

    Nolasco, D.A.; Daigger, G.T.; Stafford, D.R.; Kaupp, D.M.; Stephenson, J.P.

    1998-09-01

    A mechanistic mathematical model for carbon oxidation, nitrogen removal, and enhanced biological phosphorus removal was used to develop the Step Bio-P process, a new biological phosphorus and nitrogen removal process with a step-feed configuration. A 9,000-L pilot plant with diurnally varying influent process loading rates was operated to verify the model results and to optimize the Step Bio-P process for application at the lethbridge, Alberta, Canada, wastewater treatment plant. The pilot plant was operated for 10 months. An automatic on-line data acquisition system with multiple sampling and metering points for dissolved oxygen, mixed liquor suspended solids, ammonia-nitrogen, nitrate-nitrogen, ortho-phosphate, and flow rates was used. A sampling program to obtain off-line data was carried out to verify the information from the on-line system and monitor additional parameters. The on-line and off-line data were used to recalibrate the model, which was used as an experimental design and process optimization tool.

  7. Report of biological investigations at the Los Medanos Waste Isolation Pilot Plant (WIPP) area of New Mexico during FY 1978

    SciTech Connect

    Best, T.L.; Neuhauser, S.

    1980-03-01

    The US Department of Energy is considering the construction of a Waste Isolation Pilot Plant (WIPP) in Eddy County, NM. This location is approximately 40 km east of Carlsbad, NM. Biological studies during FY 1978 were concentrated within a 5-mi radius of drill hole ERDA 9. Additional study areas have been established at other sites in the vicinity, e.g., the Gnome site, the salt lakes and several stations along the Pecos River southward from Carlsbad, NM, to the dam at Red Bluff Reservoir in Texas. The precise locations of all study areas are presented and their biology discussed.

  8. Decommissioning samples from the Ft. Lewis, WA, solvent refined coal pilot plant: chemical analysis and biological testing

    SciTech Connect

    Weimer, W.C.; Wright, C.W.

    1985-10-01

    This report presents the results from chemical analyses and limited biological assays of three sets of samples from the Ft. Lewis, WA solvent refined coal (SRC) pilot plant. The samples were collected during the process of decommissioning this facility. Chemical composition was determined for chemical class fractions of the samples by using high-resolution gas chromatography (GC), high-resolution GC/mass spectrometry (MS) and high-resolution MS. Biological activity was measuring using both the histidine reversion microbial mutagenicity assay with Salmonella typhimurium, TA98 and an initiation/promotion mouse-skin tumorigenicity assay. 19 refs., 7 figs., 27 tabs.

  9. Preliminary performance assessment for the Waste Isolation Pilot Plant, December 1992. Volume 3, Model parameters: Sandia WIPP Project

    SciTech Connect

    Not Available

    1992-12-29

    This volume documents model parameters chosen as of July 1992 that were used by the Performance Assessment Department of Sandia National Laboratories in its 1992 preliminary performance assessment of the Waste Isolation Pilot Plant (WIPP). Ranges and distributions for about 300 modeling parameters in the current secondary data base are presented in tables for the geologic and engineered barriers, global materials (e.g., fluid properties), and agents that act upon the WIPP disposal system such as climate variability and human-intrusion boreholes. The 49 parameters sampled in the 1992 Preliminary Performance Assessment are given special emphasis with tables and graphics that provide insight and sources of data for each parameter.

  10. A summary of the sources of input parameter values for the Waste Isolation Pilot Plant final porosity surface calculations

    SciTech Connect

    Butcher, B.M.

    1997-08-01

    A summary of the input parameter values used in final predictions of closure and waste densification in the Waste Isolation Pilot Plant disposal room is presented, along with supporting references. These predictions are referred to as the final porosity surface data and will be used for WIPP performance calculations supporting the Compliance Certification Application to be submitted to the U.S. Environmental Protection Agency. The report includes tables and list all of the input parameter values, references citing their source, and in some cases references to more complete descriptions of considerations leading to the selection of values.

  11. Physical and chemical characteristics of fluorinel/sodium calcine generated during 30 cm Pilot-Plant Run 17

    SciTech Connect

    Brewer, K.N.; Kessinger, G.F.; Littleton, L.L.; Olson, A.L.

    1993-07-01

    The 30 centimeter (cm) pilot plant calciner Run 17, of March 9, 1987, was performed to study the calcination of fluroinel-sodium blended waste blended at the ratio 3.5:1 fluorinel to sodium, respectively. The product of the run was analyzed by a variety of analytical techniques that included X-ray powder diffraction (XRD), inductively coupled plasma spectroscopy (ICP), scanning electron microscopy (SEM), and X-ray photoelectron spectroscopy (XPS) to deduce physical and chemical characteristics. The analytical data, as well as data analyses and conclusions drawn from the data, are presented.

  12. Total organic carbon (VCSN and VWP) and HPLC analysis for cleaning validation in a pharmaceutical pilot plant.

    PubMed

    Queralt, M; García-Montoya, E; Pérez-Lozano, P; Suñé-Negre, J M; Miñarro, M; Ticó, J R

    2009-01-01

    This paper presents a useful method using total organic carbon analyzers employing both combustion and wet oxidation for validating equipment cleaning procedures and verifying cleaning in a pharmaceutical pilot plant. The results are compared with those obtained using high-performance liquid chromatography. The study summarizes the initial steps that should be taken into account and focuses particularly on the solutions to some of the most critical considerations (e.g., glass material, detection and quantification limits, recovery). Also described are the calculation of control limits and the good results obtained.

  13. Water-level data from wells in the vicinity of the Waste Isolation Pilot Plant, southeastern New Mexico

    USGS Publications Warehouse

    Richey, S.F.

    1987-01-01

    The U.S. Geological Survey monitored water levels in wells in the vicinity of the Waste Isolation Pilot Plant, a storage facility constructed in bedded salts in which defense-associated transuranic wastes will be deposited, in southeastern New Mexico during 1977 to 1985. A variety of methods was used to measure water levels. The particular method utilized at a given time depended on several factors, including the amount of condensation in the well, well-head configuration, depth to water, rate of water level change, and availability of equipment. The five methods utilized were: air line, Lynes pressure sentry system, M-scope, steel tape, and winch. (Lantz-PTT)

  14. Basic Data Report for Drillholes on the H-19 Hydropad (Waste Isolation Pilot Plant--WIPP)

    SciTech Connect

    Mercer, J.W.; Cole, D.L.; Holt, R.M.

    1998-10-09

    Seven holes were drilled and wells (H-19b0, H-19b2, H-19b3, H-19b4, H-19b5, H-19b6, and H-19b7) were constructed on the H-19 hydropad to conduct field activities in support of the Culebra Transport Program. These wells were drilled and completed on the Waste Isolation Pilot Plant (WIPP) site during February to September 1995. An eighth hole, H-19b1, was drilled but had to be abandoned before the target depth was reached because of adverse hole conditions. The geologic units penetrated at the H-19 location include surficial deposits of Holocene age, rocks from the Dockum Group of Upper Triassic age, the Dewey Lake Redbeds, and Rustler Formation of the Permian age. The Rustler Formation has been further divided into five informal members which include the Forty-niner Member, Magenta Member, Tamarisk Member, Culebra Dolomite Member, and an unnamed lower member. The Rustler Formation, particularly the Culebra Dolomite Member, is considered critical for hydrologic site characterization. The Culebra is the most transmissive saturated unit above the WIPP repository and, as such, is considered to be the most likely pathway for radionuclide transport to the accessible environment in the unlikely event the repository is breached. Seven cores from the Culebra were recovered during drilling activities at the H-19 hydropad and detailed descriptions of these cores were made. On the basis of geologic descriptions, four hydrostratigraphic units were identified in the Culebra cores and were correlated with the mapping units from the WFP air intake shaft. The entire length of H-19b1 was cored and was described in detail. During coring of H-19b1, moisture was encountered in the upper part of the Dewey Lake Redbeds. A 41-ft-thick section of this core was selected for detailed description to qualify the geologic conditions related to perched water in the upper Dewey Lake. In addition to cuttings and core, a suite of geophysical logs run on the drillholes was used to identify and

  15. Hydrogen generation by metal corrosion in simulated Waste Isolation Pilot Plant environments. Final report

    SciTech Connect

    Telander, M.R.; Westerman, R.E.

    1997-03-01

    The corrosion and gas-generation characteristics of four material types: low-carbon steel (the current waste packaging material for the Waste Isolation Pilot Plant), Cu-base and Ti-base (alternative packaging) materials, and Al-base (simulated waste) materials were determined in both the liquid and vapor phase of Brine A, a brine representative of an intergranular Salado Formation brine. Test environments consisted primarily of anoxic brine with overpressures of N{sub 2}, CO{sub 2}, H{sub 2}S, and H{sub 2}. Limited tests of low-carbon steel were also performed in simulated-backfill environments and in brine environments with pH values ranging from 3 to 11. Low-carbon steel reacted at a slow, measurable rate with anoxic brine, liberating H{sub 2} on an equimolar basis with Fe reacted. Presence of CO{sub 2} caused the initial reaction to proceed more rapidly, but CO{sub 2}-induced passivation stopped the reaction if the CO{sub 2} were present in sufficient quantities. Addition of H{sub 2}S to a CO{sub 2}-passivated system caused reversal of the passivation. Low-carbon steel immersed in brine with H{sub 2}S showed no reaction, apparently because of passivation of the steel by formation of FeS. Addition of CO{sub 2} to an H{sub 2}S-passivated system did not reverse the passivation. Cu- and Ti-base materials showed essentially no corrosion when exposed to brine and overpressures of N{sub 2}, CO{sub 2}, and H{sub 2}S except for the rapid and complete reaction between Cu-base materials and H{sub 2}S. The Al-base materials reacted at approximately the same rate as low-carbon steel when immersed in anoxic Brine A; considerably more rapidly in the presence of CO{sub 2} or H{sub 2}S; and much more rapidly when iron was present in the system as a brine contaminant. High-purity Al was much more susceptible to corrosion than the 6061 alloy. No significant reaction took place on any material in any environment in the vapor-phase exposures.

  16. Use of Performance Assessment in Support of Waste Isolation Pilot Plant (WIPP) Programmatic Activity Planning

    SciTech Connect

    BASABILVAZO,GEORGE; JOW,HONG-NIAN; LARSON,KURT W.; MARIETTA,MELVIN G.

    1999-09-22

    The Waste Isolation Pilot Plant (WIPP) is being developed by the U.S. Department of Energy (DOE) for the geologic (deep underground) disposal of transuranic (TRU) waste. A Compliance Certification Application (CCA) of the WIPP for such disposal was submitted to the U.S. Environmental Protection Agency (EPA) in October 1996, and was approved by EPA in May 1998. In June 1998, two separate, but related, lawsuits were filed, one against DOE and one against EPA. On March 22, 1999, the court ruled in favor of DOE, and on March 26, 1999, DOE formally began disposal operations at the WIPP for non-mixed (non-hazardous) TRU waste. Before the WIPP can begin receiving mixed (hazardous) TRU waste, a permit from the State of New Mexico for hazardous waste disposal needs to be issued. It is anticipated that the State of New Mexico will issue a hazardous waste permit by November 1999. It is further anticipated that the EPA lawsuit will be resolved by July 1999. Congress (Public Law 102-579, Section 8(f)) requires the WIPP project to be recertified by the EPA at least as frequently as once every five years from the first receipt of TRU waste at the WIPP site. As part of the DOE's WIPP project recertification strategy, Sandia National Laboratories (SNL) has used systems analysis and performance assessment to prioritize its scientific and engineering research activities. Two 1998 analyses, the near-field systems analysis and the annual sensitivity analysis, are discussed here. Independently, the two analyses arrived at similar conclusions regarding important scientific activities associated with the WIPP. The use of these techniques for the recent funding allocations at SNL's WIPP project had several beneficial effects. It increased the level of acceptance among project scientists that management had fairly and credibly compared alternatives when making prioritization decisions. It improved the ability of SNL and its project sponsor, the Carlsbad Area Office of the DOE, to

  17. Microbial gas generation under expected Waste Isolation Pilot Plant repository conditions

    SciTech Connect

    Francis, A.J.; Gillow, J.B.; Giles, M.R.

    1997-03-01

    Gas generation from the microbial degradation of the organic constituents of transuranic waste under conditions expected at the Waste Isolation Pilot Plant (WIPP) repository was investigated at Brookhaven National Laboratory. The biodegradation of mixed cellulosics (various types of paper) and electron-beam irradiated plastic and rubber materials (polyethylene, polyvinylchloride, neoprene, hypalon, and leaded hypalon) was examined. The rate of gas production from cellulose biodegradation in inundated samples incubated for 1,228 days at 30 C was biphasic, with an initial rapid rate up to approximately 600 days incubation, followed by a slower rate. The rate of total gas production in anaerobic samples containing mixed inoculum was as follows: 0.002 mL/g cellulose/day without nutrients; 0.004 mL/g cellulose/day with nutrients; and 0.01 mL/g cellulose/day in the presence of excess nitrate. Carbon dioxide production proceeded at a rate of 0.009 {micro}mol/g cellulose/day in anaerobic samples without nutrients, 0.05 {micro}mol/g cellulose/day in the presence of nutrients, and 0.2 {micro}mol/g cellulose/day with excess nitrate. Adding nutrients and excess nitrate stimulated denitrification, as evidenced by the accumulation of N{sub 2}O in the headspace (200 {micro}mol/g cellulose). The addition of the potential backfill bentonite increased the rate of CO{sub 2} production to 0.3 {micro}mol/g cellulose/day in anaerobic samples with excess nitrate. Analysis of the solution showed that lactic, acetic, propionic, butyric, and valeric acids were produced due to cellulose degradation. Samples incubated under anaerobic humid conditions for 415 days produced CO{sub 2} at a rate of 0.2 {micro}mol/g cellulose/day in the absence of nutrients, and 1 {micro}mol/g cellulose/day in the presence of bentonite and nutrients. There was no evidence of biodegradation of electron-beam irradiated plastic and rubber.

  18. Biogeochemical Investigations to Evaluate the Performance of the Waste Isolation Pilot Plant (WIPP) (Invited)

    NASA Astrophysics Data System (ADS)

    Gillow, J. B.

    2009-12-01

    The Waste Isolation Pilot Plant (WIPP) is a U.S. Department of Energy facility located in southeastern New Mexico, approximately 655 m (2150 ft.) below ground surface in a bedded salt, Permian evaporite formation. This mined geologic repository has been receiving transuranic (TRU) waste from defense-related and environmental-management activities since March 1999. TRU waste contains alpha-emitting transuranic nuclides with half-lives greater than twenty years at concentrations greater than 100 nCi/gram. These actinide-contaminated wastes were generated from nuclear-weapons production and related processing activities. They include various organics, adsorbed liquids, sludges, cellulosics, plastics, rubber, and a variety of metals and cemented materials. An extensive set of investigations were performed to establish the basis for TRU waste disposal at WIPP and to support initial certification from the U.S. Environmental Protection Agency. A significant element of the conceptual geochemical model for WIPP is the microbiologically-driven reactions leading to biodegradation of organic constituents in TRU wastes, as well as interactions with actinides present in the waste. This presentation will discuss the biogeochemical investigations that were performed to evaluate microbiological activity at WIPP, including studies of gas generation due to biodegradation of cellulose, plastic, and rubber materials and actinide-microbe interactions leading to changes in actinide chemical speciation. Highlights of this work are discussed here. Cellulose biodegradation in salt-brine systems results in the generation of carbon dioxide and hydrogen, and aqueous fermentation products (low molecular weight organic acids). Hypersaline brine can limit the range of microbial metabolic pathways, due to the energetic stresses of maintaining osmotic balance compatible with metabolic processes. Methanogenesis yields the lowest free energy per mole of carbon and as such is often not detected in

  19. DRSPALL :spallings model for the Waste Isolation Pilot Plant 2004 recertification.

    SciTech Connect

    Gilkey, Amy P.; Hansen, Clifford W.; Schatz, John F. (John F. Schatz Research & Consulting, Inc., Del Mar, CA); Rudeen, David Keith (GRAM Inc., Albuquerque, NM); Lord, David L.

    2006-02-01

    This report presents a model to estimate the spallings releases for the Waste Isolation Pilot Plant Performance Assessment (WIPP PA). A spallings release in the context of WIPP PA refers to a portion of the solid waste transported from the subsurface repository to the ground surface due to inadvertent oil or gas drilling into the WIPP repository at some time after site closure. Some solid waste will be removed by the action of the drillbit and drilling fluid; this waste is referred to as cuttings and cavings. If the repository is pressurized above hydrostatic at the time of intrusion, solid waste material local to the borehole may be subject to mechanical failure and entrainment in high-velocity gases as the repository pressure is released to the borehole. Solid material that fails and is transported into the wellbore and thus to the surface comprise the spallings releases. The spallings mechanism is analogous to a well blowout in the modern oil and gas drilling industry. The current spallings conceptual model and associated computer code, DRSPALL, were developed for the 2004 recertification because the prior spallings model used in the 1996 WIPP Compliance Certification Application (CCA) was judged by an independent peer review panel as inadequate (DOE 1996, 9.3.1). The current conceptual model for spallings addresses processes that take place several minutes before and after a borehole intrusion of a WIPP waste room. The model couples a pipe-flow wellbore model with a porous flow repository model, allowing high-pressure gas to flow from the repository to the wellbore through a growing cavity region at the well bottom. An elastic stress model is applied to the porous solid domain that allows for mechanical failure of repository solids if local tensile stress exceeds the tensile strength of the waste. Tensile-failed solids may be entrained into the wellbore flow stream by a fluidized bed model, in which case they are ultimately transported to the land surface

  20. MBM fuel feeding system design and evaluation for FBG pilot plant.

    PubMed

    Campbell, William A; Fonstad, Terry; Pugsley, Todd; Gerspacher, Regan

    2012-06-01

    A biomass fuel feeding system has been designed, constructed and evaluated for a fluidized bed gasifier (FBG) pilot plant at the University of Saskatchewan (Saskatoon, SK, Canada). The system was designed for meat and bone meal (MBM) to be injected into the gasifier at a mass flow-rate range of 1-5 g/s. The designed system consists of two stages of screw conveyors, including a metering stage which controlled the flow-rate of fuel, a rotary airlock and an injection conveyor stage, which delivered that fuel at a consistent rate to the FBG. The rotary airlock which was placed between these conveyors, proved unable to maintain a pressure seal, thus the entire conveying system was sealed and pressurized. A pneumatic injection nozzle was also fabricated, tested and fitted to the end of the injection conveyor for direct injection and dispersal into the fluidized bed. The 150 mm metering screw conveyor was shown to effectively control the mass output rate of the system, across a fuel output range of 1-25 g/s, while the addition of the 50mm injection screw conveyor reduced the irregularity (error) of the system output rate from 47% to 15%. Although material plugging was found to be an issue in the inlet hopper to the injection conveyor, the addition of air sparging ports and a system to pulse air into those ports was found to successfully eliminate this issue. The addition of the pneumatic injection nozzle reduced the output irregularity further to 13%, with an air supply of 50 slpm as the minimum air supply to drive this injector. After commissioning of this final system to the FBG reactor, the injection nozzle was found to plug with char however, and was subsequently removed from the system. Final operation of the reactor continues satisfactorily with the two screw conveyors operating at matching pressure with the fluidized bed, with the output rate of the system estimated based on system characteristic equations, and confirmed by static weight measurements made before

  1. Arsenic pilot plant operation and results - Socorro Springs, New Mexico - phase 1.

    SciTech Connect

    Aragon, Malynda Jo; Everett, Randy L.; Siegel, Malcolm Dean; Kottenstette, Richard Joseph; Holub, William E. Jr; Wright, Jeremy B.; Dwyer, Brian P.

    2007-05-01

    Sandia National Laboratories (SNL) is conducting pilot scale evaluations of the performance and cost of innovative water treatment technologies aimed at meeting the recently revised arsenic maximum contaminant level (MCL) for drinking water. The standard of 10 {micro}g/L (10 ppb) is effective as of January 2006. The first pilot tests have been conducted in New Mexico where over 90 sites that exceed the new MCL have been identified by the New Mexico Environment Department. The pilot test described in this report was conducted in Socorro New Mexico between January 2005 and July 2005. The pilot demonstration is a project of the Arsenic Water Technology Partnership program, a partnership between the American Water Works Association Research Foundation (AwwaRF), SNL and WERC (A Consortium for Environmental Education and Technology Development). The Sandia National Laboratories pilot demonstration at the Socorro Springs site obtained arsenic removal performance data for five different adsorptive media under constant ambient flow conditions. Well water at Socorro Springs has approximately 42 ppb arsenic in the oxidized (arsenate-As(V)) redox state with moderate amounts of silica, low concentrations of iron and manganese and a slightly alkaline pH (8). The study provides estimates of the capacity (bed volumes until breakthrough at 10 ppb arsenic) of adsorptive media in the same chlorinated water. Near the end of the test the feedwater pH was lowered to assess the affect on bed capacity and as a prelude to a controlled pH study (Socorro Springs Phase 2).

  2. Pilot program to identify valve failures which impact the safety and operation of light water nuclear power plants

    SciTech Connect

    Tsacoyeanes, J. C.; Raju, P. P.

    1980-04-01

    The pilot program described has been initiated under the Department of Energy Light Water Reactor Safety Research and Development Program and has the following specific objectives: to identify the principal types and causes of failures in valves, valve operators and their controls and associated hardware, which lead to, or could lead to plant trip; and to suggest possible remedies for the prevention of these failures and recommend future research and development programs which could lead to minimizing these valve failures or mitigating their effect on plant operation. The data surveyed cover incidents reported over the six-year period, beginning 1973 through the end of 1978. Three sources of information on valve failures have been consulted: failure data centers, participating organizations in the nuclear power industry, and technical documents.

  3. Valuation of potash occurrences within the nuclear waste isolation pilot plant site in southeastern New Mexico. Information circular/1980

    SciTech Connect

    Weisner, R.C.; Lemons, J.F. Jr.; Coppa, L.V.

    1980-01-01

    Current production costs and market conditions in the potash industry of the Carlsbad area were studied to determine the potential values of the potash mineral resource that would be lost or foregone if the Waste Isolation Pilot Plant (WIPP) facility is constructed on the proposed site in that area. The purpose of the WIPP project is to investigate the possibility of developing a nuclear waste disposal plant in the salt formations at the site. Analyses were made of all potash deposits determined to be in the site. Mining and processing under the most favorable recovery systems were considered. Value determinations were based upon estimated operating and capital costs of current mine-mill operations in the Carlsbad area.

  4. Properties of salt-saturated concrete and grout after six years in situ at the Waste Isolation Pilot Plant

    SciTech Connect

    Wakeley, L.D.; Harrington, P.T.; Weiss, C.A. Jr.

    1993-06-01

    Samples of concrete and grout were recovered from short boreholes in the repository floor at the Waste Isolation Pilot Plant more than six years after the concrete and grout were placed. Plugs from the Plug Test Matrix of the Plugging and Sealing Program of Sandia National Laboratories were overcored to include a shell of host rock. The cores were analyzed at the Waterways Experiment Station to assess their condition after six years of service, having potentially been exposed to those aspects of their service environment (salt, brine, fracturing, anhydrite, etc.) that could cause deterioration. Measured values of compressive strength and pulse velocity of both the grout and the concrete equaled or exceeded values from tests performed on laboratory-tested samples of the same mixtures at ages of one month to one year after casting. The phase assemblages had changed very little. Materials performed as intended and showed virtually no chemical or physical evidence of deterioration. The lowest values for strength and pulse velocity were measured for samples taken from the Disturbed Rock Zone, indicating the influence of cracking in this zone on the properties of enclosed seal materials. There was evidence of movement of brine in the system. Crystalline phases containing magnesium, potassium, sulfate, and other ions had been deposited on free surfaces in fractures and pilot holes. There was a reaction rim in the anhydrite immediately surrounding each recovered borehole plug, suggesting interaction between grout or concrete and host rock. However, the chemical changes apparent in this reaction rim were not reflected in the chemical composition of the adjacent concrete or grout. The grout and concrete studied here showed no signs of the deterioration found to have occurred in some parts of the concrete liner of the Waste Isolation Pilot Plant waste handling shaft.

  5. A review of WIPP (Waste Isolation Pilot Plant) repository clays and their relationship to clays of adjacent strata

    SciTech Connect

    Krumhansl, J.L.; Kimball, K.M.; Stein, C.L.

    1990-12-01

    The Salado Formation is a thick evaporite sequence located in the Permian Delaware Basin of southeastern New Mexico. This study focuses on the intense diagenetic alteration that has affected the small amounts of clay, feldspar, and quartz washed into the basin during salt deposition. These changes are of more than academic interest since this formation also houses the WIPP (Waste Isolation Pilot Plant). Site characterization concerns warrant compiling a detailed data base describing the clays in and around the facility horizon. An extensive sampling effort was undertaken to address these programmatic issues as well as to provide additional insight regarding diagenetic mechanisms in the Salado. Seventy-five samples were collected from argillaceous partings in halite at the stratigraphic level of the Waste Isolation Pilot Plant (WIPP). These were compared with twenty-eight samples from cores of the Vaca Triste member of the Salado, a thin clastic unit at the top of the McNutt potash zone, and with a clay-rich sample from the lower contact of the Culebra Dolomite (in the overlying Rustler Formation). These settings were compared to assess the influence of differences in brine chemistry (i.e., halite and potash facies, normal to hypersaline marine conditions) and sediment composition (clays, sandy silt, dolomitized limestone) on diagenetic processes. 44 refs., 11 figs., 5 tabs.

  6. High-field FT-ICR mass spectrometry and NMR spectroscopy to characterize DOM removal through a nanofiltration pilot plant.

    PubMed

    Cortés-Francisco, Nuria; Harir, Mourad; Lucio, Marianna; Ribera, Gemma; Martínez-Lladó, Xavier; Rovira, Miquel; Schmitt-Kopplin, Philipe; Hertkorn, Norbert; Caixach, Josep

    2014-12-15

    Ultrahigh resolution Fourier transform ion cyclotron mass spectrometry and nuclear magnetic resonance spectroscopy were combined to evaluate the molecular changes of dissolved organic matter (DOM) through an ultrafiltration-nanofiltration (UF-NF) pilot plant, using two dissimilar NF membranes tested in parallel. The sampling was performed on seven key locations within the pilot plant: pretreated water, UF effluent, UF effluent after addition of reagents, permeate NF 1, permeate NF 2, brine NF 1 and brine NF 2, during two sampling campaigns. The study showed that there is no significant change in the nature of DOM at molecular level, when the water was treated with UF and/or with the addition of sodium metabisulfite and antiscaling agents. However, enormous decrease of DOM concentration was observed when the water was treated on the NF membranes. The NF process preferentially removed compounds with higher oxygen and nitrogen content (more hydrophilic compounds), whereas molecules with longer pure aliphatic chains and less content of oxygen were the ones capable of passing through the membranes. Moreover, slight molecular selectivity between the two NF membranes was also observed.

  7. Acetic acid recovery from a hybrid biological-hydrothermal treatment process of sewage sludge - a pilot plant study.

    PubMed

    Andrews, J; Dare, P; Estcourt, G; Gapes, D; Lei, R; McDonald, B; Wijaya, N

    2015-01-01

    A two-stage process consisting of anaerobic fermentation followed by sub-critical wet oxidation was used to generate acetic acid from sewage sludge at pilot scale. Volatile fatty acids, dominated by propionic acid, were produced over 4-6 days in the 2,000 L fermentation reactor, which also achieved 31% solids reduction. Approximately 96% of the carbon was retained in solution over the fermentation stage. Using a 200 L wet oxidation reactor operating in batch mode, the second stage achieved 98% volatile suspended solids (VSS) destruction and 67% total chemical oxygen demand (tCOD) destruction. Acetic acid produced in this stage was recalcitrant to further degradation and was retained in solution. The gross yield from VSS was 16% for acetic acid and 21% for volatile fatty acids across the process, higher than reported yields for wet oxidation alone. The pilot plant results showed that 72% of the incoming phosphorus was retained in the solids, 94% of the nitrogen became concentrated in solution and 41% of the carbon was converted to a soluble state, in a more degradable form. Acetic acid produced from the process has the potential to be used to offset ethanol requirements in biological nutrient removal plants.

  8. Pilot plant testing of Illinois coal for blast furnace injection. Technical report, March 1--May 31, 1995

    SciTech Connect

    Crelling, J.C.

    1995-12-31

    A new use for Illinois coal is as fuel injected into a blast furnace to produce molten iron as first step in steel production. Because of cost and decreasing availability, metallurgical coke is being replaced by coal injected at the tuyere area of the furnace where the blast air enters. Purpose of this study is to evaluate combustion of Illinois coal in the blast furnace injection process in a pilot plant test facility. (Limited research to date suggests that coals of low fluidity and moderate to high S and Cl contents are suitable for blast furnace injection.) This proposal is intended to complete the study under way with Armco and Inland and to demonstrate quantitatively the suitability of Herrin No. 6 and Springfield No. 5 coals for injection. Main feature of current work is testing of Illinois coals at CANMET`s pilot plant coal combustion facility. During this quarter, two additional 300-pound samples of coal (IBCSP-110 Springfield No. 5 and an Appalachian coal) were delivered. Six Illinois Basin coals were analyzed with the CANMET model and compared with other bituminous coals from the Appalachians, France, Poland, South Africa, and Colombia. Based on computer modeling, lower rank bituminous coals, including coal from the Illinois Basin, compare well in injection with a variety of other bituminous coals.

  9. Comparison between ozonation and the OSA process: analysis of excess sludge reduction and biomass activity in two different pilot plants.

    PubMed

    Torregrossa, Michele; Di Bella, Gaetano; Di Trapani, Daniele

    2012-01-01

    The excess biomass produced during biological treatment of municipal wastewater represents a major issue worldwide, as its disposal implies environmental, economic and social impacts. Therefore, there has been a growing interest in developing technologies to reduce sludge production. The main proposed strategies can be categorized according to the place inside the wastewater treatment plant (WWTP) where the reduction takes place. In particular, sludge minimization can be achieved in the wastewater line as well as in the sludge line. This paper presents the results of two pilot scale systems, to evaluate their feasibility for sludge reduction and to understand their effect on biomass activity: (1) a pilot plant with an ozone contactor in the return activated sludge (RAS) stream for the exposition of sludge to a low ozone dosage; and (2) an oxic-settling-anaerobic (OSA) process with high retention time in the anaerobic sludge holding tank have been studied. The results showed that both technologies enabled significant excess sludge reduction but produced a slight decrease of biomass respiratory activity.

  10. Lipase-catalyzed biodiesel production from waste activated bleaching earth as raw material in a pilot plant.

    PubMed

    Park, Enoch Y; Sato, Masayasu; Kojima, Seiji

    2008-05-01

    The production of fatty acid methyl esters (FAMEs) from waste activated bleaching earth (ABE) discarded by the crude oil refining industry using lipase from Candida cylindracea was investigated in a 50-L pilot plant. Diesel oil or kerosene was used as an organic solvent for the transesterification of triglycerides embedded in the waste ABE. When 1% (w/w) lipase was added to waste ABE, the FAME content reached 97% (w/w) after reaction for 12 h at 25 degrees C with an agitation rate of 30 rpm. The FAME production rate was strongly dependent upon the amount of enzyme added. Mixtures of FAME and diesel oil at ratios of 45:55 (BDF-45) and 35:65 (BDF-35) were assessed and compared with the European specifications for biodiesel as automotive diesel fuel, as defined by pr EN 14214. The biodiesel quality of BDF-45 met the EN 14214 standard. BDF-45 was used as generator fuel, and the exhaust emissions were compared with those of diesel oil. The CO and SO2 contents were reduced, but nitrogen oxide emission increased by 10%. This is the first report of a pilot plant study of lipase-catalyzed FAME production using waste ABE as a raw material. This result demonstrates a promising reutilization method for the production of FAME from industrial waste resources containing vegetable oils for use as a biodiesel fuel.

  11. Biological removal of organic constituents in quench water from a slagging, fixed-bed coal-gasification pilot plant

    SciTech Connect

    Stamoudis, V C; Luthy, R G

    1980-02-01

    This study is part of an effort to assess the efficiency of activated-sludge treatment for removal of organic constituents from high-Btu coal-gasification pilot-plant quench waters. A sample of raw-gas quench water was obtained from the Grand Forks Energy and Technology Center's pilot plant, which employs the slagging, fixed-bed gasification process. The quench water generated in the processing of Indian Head lignite was pretreated to reduce ammonia and alkalinity, and then diluted and subjected to long-term biological treatment, followed by detailed characterization and analysis of organic constituents. The pretreated (influent) and treated (effluent) samples were extracted using a methylene chloride, pH-fractionation method to obtain acid, base, and neutral fractions, which were analyzed by capillary-column gas chromatography/mass spectrometry (GC/MS). Over 99% of the total extractable and chromatographable organic material in the influent acid fraction was composed of phenol and alkylated phenols. Biological treatment removed these compounds almost completely. Major components of the influent base fraction were alkylated pyridines, anilines, aminopyrroles, imidazoles and/or pyrazoles, diazines, and quinolines. Removal efficiency of these compounds ranged between 90 and 100%. The influent neutral fraction was composed mainly of cycloalkanes, cycloalkenes, naphthalene, indole, acetophenone, and benzonitrile. Alkylated benzenes were generally absent. Removal efficiencies of these compounds were generally very good, except for certain alkylated cycloalkanes and cycloalkenes. Results are compared with those of a similar study on HYGAS coal-gasification quench water.

  12. Pilot Plant Testing of Elemental Mercury Reemission from a Wet Scrubber (2)

    EPA Science Inventory

    This paper discusses the recent observations of elemental mercury (HgO) reemissions from a pilot-scale limestone wet scrubber. Simulated flue gas was generated by burning natural gas in a down-fired furnace and doped with 2000 ppm of sulfur dioxide (S02). Mercuric chloride (HgCl2...

  13. PILOT PLANT TESTING OF ELEMENTAL MERCURY RE-EMISSION FROM WET SCRUBBERS

    EPA Science Inventory

    A pilot-scale wet lime/limestone flue gas desulfurization scrubber system was designed to conduct mercury emission control research. The first tests focused on investigating the phenomenon of Hgo re-emission from wet scrubbers with a specific objective of developing a Hgo re-emis...

  14. Certifying the Waste Isolation Pilot Plant: Lessons Learned from the WIPP Experience

    SciTech Connect

    Anderson, D.R.; Chu, Margaret S.Y.; Froehlich, Gary K.; Howard, Bryan A.; Howarth, Susan M.; Larson, Kurt W.; Pickering, Susan Y.; Swift, Peter N.

    1999-07-13

    In May 1998, the US Environmental Protection Agency (EPA) certified the US Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP) as being in compliance with applicable long-term regulations governing the permanent disposal of spent nuclear fuel, high-level, and transuranic radioactive wastes. The WIPP is the first deep geologic repository in the US to have successfully demonstrated regulatory compliance with long-term radioactive waste disposal requirements. The first disposal of TRU waste at WIPP occurred on March 26, 1999. Many of the lessons learned during the WIPP Project's transition from site characterization and experimental research to the preparation of a successful application may be of general interest to other repository programs. During a four-year period (1992 to 1996), the WIPP team [including the DOE Carlsbad Area Office (CAO), the science advisor to CAO, Sandia National Laboratories (SNL), and the management and operating contractor of the WIPP site, Westinghouse Electric Corporation (WID)] met its aggressive schedule for submitting the application without compromising the integrity of the scientific basis for the long-term safety of the repository. Strong leadership of the CAO-SNL-WID team was essential. Within SNL, a mature and robust performance assessment (PA) allowed prioritization of remaining scientific activities with respect to their impact on regulatory compliance. Early and frequent dialog with EPA staff expedited the review process after the application was submitted. Questions that faced SNL are familiar to geoscientists working in site evaluation projects. What data should be gathered during site characterization? How can we know when data are sufficient? How can we know when our understanding of the disposal system is sufficient to support our conceptual models? What constitutes adequate ''validation'' of conceptual models for processes that act over geologic time? How should we use peer review and expert judgment? Other

  15. Contact-Handled Transuranic Waste Acceptance Criteria for the Waste Isolation Pilot Plant

    SciTech Connect

    Washington TRU Solutions LLC

    2005-12-29

    The purpose of this document is to summarize the waste acceptance criteria applicable to the transportation, storage, and disposal of contact-handled transuranic (CH-TRU) waste at the Waste Isolation Pilot Plant (WIPP). These criteria serve as the U.S. Department of Energy's (DOE) primary directive for ensuring that CH-TRU waste is managed and disposed of in a manner that protects human health and safety and the environment.The authorization basis of WIPP for the disposal of CH-TRU waste includes the U.S.Department of Energy National Security and Military Applications of Nuclear EnergyAuthorization Act of 1980 (reference 1) and the WIPP Land Withdrawal Act (LWA;reference 2). Included in this document are the requirements and associated criteriaimposed by these acts and the Resource Conservation and Recovery Act (RCRA,reference 3), as amended, on the CH-TRU waste destined for disposal at WIPP.|The DOE TRU waste sites must certify CH-TRU waste payload containers to thecontact-handled waste acceptance criteria (CH-WAC) identified in this document. Asshown in figure 1.0, the flow-down of applicable requirements to the CH-WAC istraceable to several higher-tier documents, including the WIPP operational safetyrequirements derived from the WIPP CH Documented Safety Analysis (CH-DSA;reference 4), the transportation requirements for CH-TRU wastes derived from theTransuranic Package Transporter-Model II (TRUPACT-II) and HalfPACT Certificates ofCompliance (references 5 and 5a), the WIPP LWA (reference 2), the WIPP HazardousWaste Facility Permit (reference 6), and the U.S. Environmental Protection Agency(EPA) Compliance Certification Decision and approval for PCB disposal (references 7,34, 35, 36, and 37). The solid arrows shown in figure 1.0 represent the flow-down of allapplicable payload container-based requirements. The two dotted arrows shown infigure 1.0 represent the flow-down of summary level requirements only; i.e., the sitesmust reference the regulatory source

  16. PROBABILISTIC SAFETY ASSESSMENT OF OPERATIONAL ACCIDENTS AT THE WASTE ISOLATION PILOT PLANT

    SciTech Connect

    Rucker, D.F.

    2000-09-01

    This report presents a probabilistic safety assessment of radioactive doses as consequences from accident scenarios to complement the deterministic assessment presented in the Waste Isolation Pilot Plant (WIPP) Safety Analysis Report (SAR). The International Council of Radiation Protection (ICRP) recommends both assessments be conducted to ensure that ''an adequate level of safety has been achieved and that no major contributors to risk are overlooked'' (ICRP 1993). To that end, the probabilistic assessment for the WIPP accident scenarios addresses the wide range of assumptions, e.g. the range of values representing the radioactive source of an accident, that could possibly have been overlooked by the SAR. Routine releases of radionuclides from the WIPP repository to the environment during the waste emplacement operations are expected to be essentially zero. In contrast, potential accidental releases from postulated accident scenarios during waste handling and emplacement could be substantial, which necessitates the need for radiological air monitoring and confinement barriers (DOE 1999). The WIPP Safety Analysis Report (SAR) calculated doses from accidental releases to the on-site (at 100 m from the source) and off-site (at the Exclusive Use Boundary and Site Boundary) public by a deterministic approach. This approach, as demonstrated in the SAR, uses single-point values of key parameters to assess the 50-year, whole-body committed effective dose equivalent (CEDE). The basic assumptions used in the SAR to formulate the CEDE are retained for this report's probabilistic assessment. However, for the probabilistic assessment, single-point parameter values were replaced with probability density functions (PDF) and were sampled over an expected range. Monte Carlo simulations were run, in which 10,000 iterations were performed by randomly selecting one value for each parameter and calculating the dose. Statistical information was then derived from the 10,000 iteration

  17. Integration of Thirty Years of Hydrogeological Investigations at the Waste Isolation Pilot Plant Site

    NASA Astrophysics Data System (ADS)

    Beauheim, R. L.; Domski, P. S.; Holt, R. M.; Powers, D. W.

    2008-12-01

    Hydrogeological research has been going on at the Waste Isolation Pilot Plant (WIPP), the U.S. Department of Energy's deep geologic repository for transuranic and mixed waste in southeastern New Mexico, for over thirty years. The main focus of the research has been on the Culebra Dolomite Member of the Rustler Formation, a 7-m-thick fractured unit that would be the primary groundwater transport pathway for radionuclides released from the WIPP repository by inadvertent human intrusion. Since 1977, 90 wells have been completed to the Culebra on 63 drilling pads. Hydraulic tests have been performed in all of the wells, ranging from single-well slug and pumping tests to long-term (19-121 days) pumping tests with observation wells up to 9.5 km away. These tests have shown that Culebra transmissivity (T) varies over 10 orders of magnitude. Single-well injection-withdrawal, two-well recirculating, and multiwell convergent-flow tracer tests have been performed at six locations. Fluid electrical conductivity logging has been performed to identify the most transmissive sections of the Culebra, and a colloidal borescope has been used to identify specific flowing fractures. In addition to studies focused on groundwater flow and transport, geological, sedimentological, hydrogeochemical, and geophysical investigations have also been performed. Variations in Culebra T have been related to dissolution of the underlying Salado Formation, the presence/absence of gypsum cements, the presence or absence of halite in Rustler members above and below the Culebra, and overburden thickness. Different types of porosity (fractures, vugs, interparticle, intercrystalline) have been found to be significant for both flow and transport. Culebra water chemistry shows significant spatial variation, with total dissolved solids ranging from 3,000 to 300,000 mg/L. Five distinct hydrochemical facies have been identified, ranging from high ionic strength syndepositional Na-Mg Cl brines to low ionic

  18. Integration of a Higher Plant Chamber into the European Space Agency's MELiSSA Pilot Plant: The Canadian Role in Advanced Life Support Test-Bed Development

    NASA Astrophysics Data System (ADS)

    Waters, Geoffrey; Lawson, Jamie; Gidzinski, Danuta; Stasiak, Michael; Dixon, Mike; Peiro, Enrique; Godia, Francesc; Paille, Christel; Fossen, Arnaud; Lamaze, Brigitte; Lasseur, Christophe

    The European Space Agency's Micro-Ecological Life Support System Alternative (MELiSSA) project has been conceived as a tool for developing the technology of future biological life support systems required for long-term human space exploration missions to the Moon or Mars. The main life support functions of MELiSSA are the recycling of waste (inedible plant biomass, human excrement), carbon dioxide and minerals and the production of food, fresh water and air revitalization. Based on the principle of an aquatic ecosystem, MELiSSA is comprised of four microbial compartments and a higher plant compartment integrated in a closed loop. Each compartment is studied, designed and demonstrated at laboratory scale before being scaled-up for subsequent integration into the MELISSA Pilot Plant (MPP) at the Universitat Aut`noma de Barcelona. Work related to higher plant cultivation systems, o which have been historically focussed at the University of Guelph's Controlled Environment Systems Research Facility (CESRF), has included design of the HPC for the MPP, the metabolic characterization of MELiSSA candidate crops and the validation of theoretical gas exchange and nutrient dynamic models, The presented paper will review some of the recent data and HPC design work of CESRF conducted as part of Canada's involvement in the MELiSSA program and its partnership in the development of the MPP terrestrial demonstration test-bed.

  19. Design and optimization of a 36 MT/day pilot plant for the removal of sulfur from coal using the perchloroethylene process

    SciTech Connect

    Thome, T.L.; Fullerton, K.L.; Lee, S.

    1994-12-31

    Perchloroethylene solvent can be used for both the physical and chemical cleaning of high sulfur, finely crushed coals. Previous studies using bench-scale extractions have shown that perchloroethylene solvent can remove from 20% to 60% of the organic sulfur in many coals. Associated research using glass tube settlers has demonstrated the potential for using perchloroethylene as a heavy medium for the removal of pyrites and mineral matter using a float/sink process. Additionally, a mini-plot plant has been designed and fabricated to study the cleaning of coal using perchloroethylene in a continuous process. Data from the studies are used to develop models for the unit operations in the coal cleaning process. The models are then used to support the design of a 36 MT/day pilot plant planned for future construction. Studies are done using ASPEN to assess the optimal configuration for the 36 MT/day pilot plant unit operations and to evaluate overall plant efficiency.

  20. Two treatment methods for stormwater sediments--pilot plant and landfarming--and reuse of the treated sediments in civil engineering.

    PubMed

    Petavy, F; Ruban, V; Conil, P; Viau, J Y; Auriol, J C

    2009-07-01

    The aim of this research was to present a pilot plant for the treatment of stormwater sediments and to compare the decontamination rate to that obtained by landfarming. The possibilities for reuse of the treated sediments in civil engineering are also studied. Four sediments from retention/infiltration ponds or from street sweeping were studied. In each case organic matter (OM), total hydrocarbons (TH) and polycyclic aromatic hydrocarbons (PAH) were measured. Geotechnical tests were carried out to evaluate the reuse possibilities of the treated sediments. Treatment by means of the pilot plant was efficient at reducing TH and PAH concentrations: THs were reduced by 53-97% and PAHs were decreased by 60-95%. By comparison, a reduction of 45-75% in TH concentration is obtained with landfarming, whereas there is no significant decrease in PAHs. Furthermore, geotechnical tests showed that the treated fractions from the pilot plant can be reused as road embankments and as a capping layer. These results are most encouraging and show that stormwater sediments can valuably be reused after treatment in a pilot plant. Landfarming is less efficient but this technique could be used as a pretreatment in the case of high TH pollution.

  1. An introduction to the mechanics of performance assessment using examples of calculations done for the Waste Isolation Pilot Plant between 1990 and 1992. Revision

    SciTech Connect

    Rechard, R.P.

    1996-06-01

    This document provides an overview of the processes used to access the performance of the Waste Isolation Pilot Plant (WIPP). The quantitative metrics used in the performance-assessment (PA) process are those put forward in the Environmental Protection Agency`s Environmental Standards for the Management and Disposal of Spent Nuclear Fuel, HIgh-LEvel and transuranic radioactive Wastes (40 CFR 191).

  2. Nonthermal processing of orange juice using a pilot-plant scale supercritical carbon dioxide system with a gas-liquid metal contactor

    Technology Transfer Automated Retrieval System (TEKTRAN)

    To evaluate the effect of pilot-plant scale, non-thermal supercritical carbon dioxide (SCCO2) processing on the safety and the quality of orange juice (OJ), SCCO2 processed juice was compared with untreated fresh juice and equivalently thermal processed juice in terms of lethality. SCCO2 processing ...

  3. DOE's Notification of Planned Change to the EPA 40 CFR Part 194 Certification of the Waste Isolation Pilot Plant: Remote-Handled Transuranic Waste Characterization Plan

    EPA Pesticide Factsheets

    The U.S. Department of Energy's Carlsbad Field Office (DOE/CBFO) provided the U.S. Environmental Protection Agency (EPA) this Notification of Planned Change to accept remote-handled (RH) transuranic (TRU) waste at the Waste Isolation Pilot Plant (WIPP).

  4. Milestones for disposal of radioactive waste at the Waste Isolation Pilot Plant (WIPP) in the United States

    SciTech Connect

    Rechard, R.P.

    1998-04-01

    Since its identification as a potential deep geologic repository in about 1973, the regulatory assessment process for the Waste Isolation Pilot Plant (WIPP) in New Mexico has developed over the past 25 years. National policy issues, negotiated agreements, and court settlements over the first half of the project had a strong influence on the amount and type of scientific data collected. Assessments and studies before the mid 1980s were undertaken primarily (1) to satisfy needs for environmental impact statements, (2) to develop general understanding of selected natural phenomena associated with nuclear waste disposal, or (3) to satisfy negotiated agreements with the State of New Mexico. In the last third of the project, federal compliance policy and actual regulations were sketched out, but continued to evolve until 1996. During this eight-year period, four preliminary performance assessments, one compliance performance assessment, and one verification performance assessment were performed.

  5. Draft Title 40 CFR 191 compliance certification application for the Waste Isolation Pilot Plant. Volume 7: Appendix GCR Volume 2

    SciTech Connect

    1995-03-31

    This report contains the second part of the geological characterization report for the Waste Isolation Pilot Plant. Both hydrology and geochemistry are evaluated. The following aspects of hydrology are discussed: surface hydrology; ground water hydrology; and hydrology drilling and testing. Hydrologic studies at the site and adjacent site areas have concentrated on defining the hydrogeology and associated salt dissolution phenomena. The geochemical aspects include a description of chemical properties of geologic media presently found in the surface and subsurface environments of southeastern New Mexico in general, and of the proposed WIPP withdrawal area in particular. The characterization does not consider any aspect of artificially-introduced material, temperature, pressure, or any other physico-chemical condition not native to the rocks of southeastern New Mexico.

  6. The effect of stratigraphic dip on brine inflow and gas migration at the Waste Isolation Pilot Plant

    SciTech Connect

    Webb, S.W.; Larson, K.W.

    1996-02-01

    The natural dip of the Salado Formation at the Waste Isolation Pilot Plant (WIPP), although regionally only about 111, has the potential to affect brine inflow and gas-migration distances due to buoyancy forces. Current models, including those in WIPP Performance Assessment calculations, assume a perfectly horizontal repository and stratigraphy. With the addition of buoyancy forces due to the dip, brine and gas flow patterns can be affected. Brine inflow may increase due to countercurrent flow, and gas may preferentially migrate up dip. This scoping study has used analytical and numerical modeling to evaluate the impact of the dip on brine inflow and gas-migration distances at the WIPP in one, two, and three dimensions. Sensitivities to interbed permeabilities, two-phase curves, gas-generation rates, and interbed fracturing were studied.

  7. A select bibliography with abstracts of reports related to Waste Isolation Pilot Plant geotechnical studies (1972--1990)

    SciTech Connect

    Powers, D.W.; Martin, M.L.

    1993-08-01

    This select bibliography contains 941 entries. Each bibliographic entry contains the citation of a report, conference paper, or journal article containing geotechnical information about the Waste Isolation Pilot Plant (WIPP). The entries cover the period from 1972, when investigation began for a WIPP Site in southeastern New Mexico, through December 1990. Each entry is followed by an abstract. If an abstract or suitable summary existed, it has been included; 316 abstracts were written for other documents. For some entries, an annotation has been provided to clarify the abstract, comment on the setting and significance of the document, or guide the reader to related reports. An index of key words/phrases is included for all entries.

  8. Milestones for disposal of radioactive waste at the Waste Isolation Pilot Plant (WIPP) in the United States

    SciTech Connect

    RECHARD,ROBERT P.

    2000-03-01

    The opening of the Waste Isolation Pilot Plant on March 26, 1999, was the culmination of a regulatory assessment process that had taken 25 years. National policy issues, negotiated agreements, and court settlements during the first 15 years of the project had a strong influence on the amount and type of scientific data collected up to this point. Assessment activities before the mid 1980s were undertaken primarily (1) to satisfy needs for environmental impact statements, (2) to satisfy negotiated agreements with the State of New Mexico, or (3) to develop general understanding of selected natural phenomena associated with nuclear waste disposal. In the last 10 years, federal compliance policy and actual regulations were sketched out, and continued to evolve until 1996. During this period, stochastic simulations were introduced as a tool for the assessment of the WIPP's performance, and four preliminary performance assessments, one compliance performance assessment, and one verification performance assessment were performed.

  9. Environmental assessment for the reuse of TNX as a multi-purpose pilot plant campus at the Savannah River Site

    SciTech Connect

    1998-07-01

    The Department of Energy (DOE) prepared this environmental assessment (EA) to analyze the potential environmental and safety impacts of DOE planning to allow asset reuse of the TNX Area at the Savannah River Site (SRS) located near Aiken, South Carolina. The proposed action would include providing for a location for the Centers of Excellence at or adjacent to SRS and entering into a cooperative agreement with a non-profit management and operations (management firm) contractor to operate and market the TNX facilities and equipment. The area (formerly TNX) would be called a Multi-Purpose Pilot Plant Campus (MPPC) and would be used: (1) as location for technology research, development, demonstration, and commercial operations; (2) to establish partnerships with industry to develop applied technologies for commercialization; and (3) serve as administrative headquarters for Centers of Excellence in the program areas of soil remediation, radioecology, groundwater contamination, and municipal solid waste minimization.

  10. Quantification of gypsum crystal nucleation, growth, and breakage rates in a wet flue gas desulfurization pilot plant

    SciTech Connect

    Hansen, B.B.; Kiil, S.; Johnsson, J.E.

    2009-10-15

    The aim of this work is to study the influence of nucleation, growth and breakage on the particle size distribution (PSD) of gypsum crystals produced by the wet flue gas desulfurization (FGD) process. The steady state PSD, obtained in a falling film wet FGD pilot plant during desulfurization of a 1000 ppm(V) SO{sub 2} gas stream, displayed a strong nonlinear behaviour (in a ln(n(l)) vs. I plot) at the lower end of the particle size range, compared to the well-known linear mixed suspension mixed product removal model. A transient population balance breakage model, fitted to experimental data, was able to model an increase in the fraction of small particles, but not to the extent observed experimentally. A three-parameter, size-dependent growth model, previously used for sodium sulphate decahydrate and potash alum, was able to describe the experimental data, indicating either size-dependent integration kinetics or growth rate dispersion.

  11. Construction of the thermal/structural interactions in situ tests at the Waste Isolation Pilot Plant (WIPP)

    SciTech Connect

    Munson, D.E.; Matalucci, R.V.; Hoag, D.L.; Blankenship D.A.

    1997-02-01

    The Department of Energy has constructed the Waste Isolation Pilot Plant (WIPP) to develop the technology for the disposal of radioactive waste from defense programs. Sandia National Laboratories has the responsibility for experimental activities at the WIPP and has emplaced several large-scale Thermal/Structural Interactions (TSI) in situ tests to validate techniques used to predict repository performance. The construction of the tests relied heavily on earlier excavations at the WIPP site to provide a basis for selecting excavation, surveying, and instrumentation methods, and achievable construction tolerances. The tests were constructed within close tolerances to provide consistent room dimensions and accurate placement of gages. This accuracy has contributed to the high quality of data generated which in turn has facilitated the comparison of test results to numerical predictions. The purpose of this report is to detail the construction activities of the TSI tests.

  12. Permeate flux optimisation of a pilot microfiltration plant for cost-effectiveness of water reclamation for reuse.

    PubMed

    Xie, R J; Gomez, M J; Xing, Y J

    2006-01-01

    A pilot plant was constructed with eight elements of an Asahi microfiltration (MF) membrane-a total filtration surface area of 56 m2. Performance of the plant was examined in preparation of a secondary sewage effluent without coagulant for reverse osmosis membrane treatment. Production at different permeate flux was tested for evaluation of the changes in transmembrane pressure (TMP) and specific permeate flux (SPF) with time. Clean-in-place (CIP) was conducted when TMP reached a value about 2 atm after each test. For permeate flux of 48, 55, 61 and 66 L m-2 h-1, the ceiling TMP was reached after filtration for approximately 420, 200, 225, and 195 h, respectively. The corresponding cumulative permeate volumes were 1130, 620, 765, 720 m3 before a CIP was necessary. The SPF decreased quickly with increases in permeate flux and the corresponding half-SPF times were 147, 89, 75 and 39 h for the respective flux studied. The membrane fouling tolerance was greater at a lower than at a higher flux. Analysis of the performance data suggests that run of the MF plant at higher permeate flux with more frequent and quick CIP might produce more water. The optimal filtration durations were found to be 12, 8, 7 and 3 days for permeate flux of 48, 55, 61 and 66 L m-2 h-1, respectively. Prolonged filtration after the optimal interval without CIP may not maximise the economical benefit.

  13. Application and evaluation of the washing effect in the collector well using pilot plant with washing device

    NASA Astrophysics Data System (ADS)

    Cho, K. H.; Kim, B. J.; Choi, N. C.; Lee, S. J.; Lee, B. H.

    2012-04-01

    Riverbed/bank filtration (RBF) is a natural process used as a first step in drinking water treatment. RBF systems consist of well fields that draw water from an aquifer that is hydraulically connected to surface waters. The benefits of RBF are multiple and include a reduction of turbidity, total coliform, microbial contaminants natural organic matter, and organic contaminants. Some of the disadvantages of RBF include the difficulty of preventing river water from infiltrating the aquifer in in-stances of severe river contamination, the geochemical reaction of the infiltrate with aquifer materials that may raise the aqueous concentrations of Fe2+, Mn2+, As, NH4+, CH4, Ca2+ and HCO3- , and clogging of the riverbed. For example, has demonstrated that riverbed clogging may decrease the specific capacity of RBF wells (flow reduction in the collector well etc.). The objective of this study is to optimization and evaluation the washing effect on various nozzle type and intervals, soil retention rate in the collector well using pilot plant with washing device for prevention flow reduction in the collector well. The Pilot plant experiments were conducted under various conditions; two kinds nozzle type (spray nozzle of circle type (single - Full Cone, multi - Hollow Cone) and spray nozzle of fan shape type (Veejet)), two different nozzle intervals (200 mm, 400mm) and a various soil retention rate in the collector well (10 ~ 40%). The results of experiment showed that in the nozzle type case, the washing effect of the veeject nozzle was more effective than other (Full Cone, Hollow Cone) nozzle through spray results (range, strength and height). In the nozzle interval conditions, washing effect is 200 mm better than 400 mm through spray distance and soil height. The washing efficiency in the collector well increased on soil retention rate decreased and the nozzle injection pressure increased using washing device

  14. Pilot plant testing of Illinois coal for blast furnace injection. Quarterly report, 1 December 1994--28 February 1995

    SciTech Connect

    Crelling, J.C.

    1995-12-31

    A potentially new use for Illinois coal is its use as a fuel injected into a blast furnace to produce molten iron as the first step in steel production. Because of its increasing cost and decreasing availability, metallurgical coke is now being replaced by coal injected at the tuyere area of the furnace where the blast air enters. The purpose of this study is to evaluate the combustion of Illinois coal in the blast furnace injection process in a new and unique pilot plant test facility. This investigation is significant to the use of Illinois coal in that the limited research to date suggests that coals of low fluidity and moderate to high sulfur and chlorine contents are suitable feedstocks for blast furnace injection. This study is unique in that it is the first North American effort to directly determine the nature of the combustion of coal injected into a blast furnace. This proposal is a follow-up to one funded for the 1993--94 period. It is intended to complete the study already underway with the Armco and Inland steel companies and to demonstrate quantitatively the suitability of both the Herrin No. 6 and Springfield No. 5 coals for blast furnace injection. The main feature of the current work is the testing of Illinois coals at CANMET`s (Canadian Centre for Mineral and Energy Technology) pilot plant coal combustion facility. This facility simulates blowpipe-tuyere conditions in an operating blast furnace, including blast temperature (900{degrees}C), flow pattern (hot velocity 200 m/s), geometry, gas composition, coal injection velocity (34 m/s) and residence time (20 ms). The facility is fully instrumented to measure air flow rate, air temperature, temperature in the reactor, wall temperature, preheater coil temperature and flue gas analysis. During this quarter there were two major accomplishments.

  15. Pilot plant testing of Illinois coal for blast furnace injection. Technical report, September 1--November 30, 1994

    SciTech Connect

    Crelling, J.C.

    1994-12-31

    The purpose of this study is to evaluate the combustion of Illinois coal in the blast furnace injection process in a new and unique pilot plant test facility. This investigation is significant to the use of Illinois coal in that the limited research to date suggests that coals of low fluidity and moderate to high sulfur and chlorine contents are suitable feedstocks for blast furnace injection. This study is unique in that it is the first North American effort to directly determine the nature of the combustion of coal injected into a blast furnace. It is intended to complete the study already underway with the Armco and Inland steel companies and to demonstrate quantitatively the suitability of both the Herrin No. 6 and Springfield No. 5 coals for blast furnace injection. The main feature of the current work is the testing of Illinois coals at CANMET`s (Canadian Centre for Mineral and Energy Technology) pilot plant coal combustion facility. This facility simulates blowpipe-tuyere conditions in an operating blast furnace, including blast temperature (900 C), flow pattern (hot velocity 200 m/s), geometry, gas composition, coal injection velocity (34 m/s) and residence time (20 ms). The facility is fully instrumented to measure air flow rate, air temperature, temperature in the reactor, wall temperature, preheater coil temperature and flue gas analysis. During this quarter a sample of the Herrin No. 6 coal (IBCSP 112) was delivered to the CANMET facility and testing is scheduled for the week of 11 December 1994. Also at this time, all of the IBCSP samples are being evaluated for blast furnace injection using the CANMET computer model.

  16. Pilot plant investigations on cleaning efficiencies to reduce hazelnut cross-contamination in industrial manufacture of cookies.

    PubMed

    Röder, Martin; Ibach, Anja; Baltruweit, Iris; Gruyters, Helwig; Janise, Annabella; Suwelack, Carola; Matissek, Reinhard; Vieths, Stefan; Holzhauser, Thomas

    2008-11-01

    Shared equipment in industrial food manufacture has repeatedly been described as a potential source of unlabeled food allergens, i.e., hidden allergens. However, the impact of shared equipment on allergen cross-contamination is basically unknown. Therefore, we sought to investigate systematically the extent of hazelnut cross-contamination in fine bakery wares as a model. A product change from cookies with 10% hazelnut to cookies without hazelnuts was simulated on pilot plant equipment. The extent of hazelnut cross-contamination (HNCC) was analyzed by enzyme-linked immunosorbent assay (ELISA) for each production device (kneaders, rotary molder, wire cutting machine, and steel band oven) and various cleaning procedures used between products. The experiments were performed repeatedly with finely ground hazelnuts and with roughly chopped hazelnut kernels. Cross-contamination from chopped kernels was distributed statistically but not homogeneously, and sampling and analysis with the ELISA was therefore not reproducible. Further analysis concentrated on homogenously distributed HNCC from ground hazelnut. Apart from product changes without intermediate cleaning, the highest HNCC was found after mechanical scraping: Up to 100 mg/kg hazelnut protein was found in the follow-up product after processing by one machine. After additional cleaning with hot water, the HNCC decreased regardless of the processing device to levels at or below 1 mg/kg hazelnut protein. In our pilot plant study, the application of an appropriate wet cleaning procedure in combination with quantitative monitoring of the cleaning efficiency reduced the hazelnut protein cross-contamination to a level at which severe hazelnut-related allergic reactions are unlikely to occur.

  17. Pilot plant UF/sub 6/ to UF/sub 4/ test operations report

    SciTech Connect

    Bicha, W.J.; Fallings, M.; Gilbert, D.D.; Koch, G.E.; Levine, P.J.; McLaughlin, D.F.; Nuhfer, K.R.; Reese, J.C.

    1987-02-01

    The FMPC site includes a plant designed for the reduction of uranium hexafluoride (UF/sub 6/) to uranium tetrafluoride (UF/sub 4/). Limited operation of the upgraded reduction facility began in August 1984 and continued through January 19, 1986. A reaction vessel ruptured on that date causing the plant operation to be shut down. The DOE conducted a Class B investigation with the findings of the investigation board issued in preliminary form in May 1986 and as a final recommendation in July 1986. A two-phase restart of the plant was planned and implemented. Phase I included implementing safety system modifications, changing reaction vessel temperature control strategy, and operating the reduction plant under an 8-week controlled test. The results of the test period are the subject of this report. 41 figs., 11 tabs.

  18. Pilot plant study of alternative filter media for rapid gravity filtration.

    PubMed

    Davies, P D; Wheatley, A D

    2012-01-01

    Sand has been the main filter media used in rapid gravity filtration since its introduction. The dominance of sand has been due to its low cost and availability. Extensive experience has led to sand filters with a dependable and predictable performance. Sand remains the preferred filter medium but usually with a larger sized anthracite capping to reduce the onset of head loss. Other approved filter media are now commercially available and this paper compares sand with recycled glass, Filtralite(®) and slate at pilot scale. The results have reaffirmed the basic importance of particle size on head loss and turbidity performance rather than surface activity or specific surface area. The results did suggest, however, that particle shape and packing exerted a stronger influence on performance than previously acknowledged. These could be used to improve the design and the contribution to sustainability made by rapid gravity filters.

  19. H-coal pilot plant. Phase II. Construction. Phase III. Operation. Annual report No. 3

    SciTech Connect

    Not Available

    1981-02-04

    At the request of DOE Oak Ridge, ASFI agreed to assume responsibility for completion of Plant construction in December, 1979, at which time Badger Plants' on-site work was ended. This construction effort consisted of electric heat tracing and insulation of piping and instrumentation. At the close of the reporting period the work was completed, or was projected to be completed, within the ASFI budgeted amounts and by dates that will not impact Plant operations. Engineering design solutions were completed for problems encountered with such equipment as the High Pressure Letdown Valves; Slurry Block Valves; Slurry Pumps; the Bowl Mill System; the Dowtherm System; and the Ebullating Pump. A Corrosion Monitoring Program was established. With the exception of Area 500, the Antisolvent Deashing Unit, all operating units were commissioned and operated during the reporting period. Coal was first introduced into the Plant on May 29, 1980, with coal operations continuing periodically through September 30, 1980. The longest continuous coal run was 119 hours. A total of 677 tons of Kentucky No. 11 Coal were processed during the reporting period. The problems encountered were mechanical, not process, in nature. Various Environmental and Health programs were implemented to assure worker safety and protection and to obtain data from Plant operations for scientific analysis. These comprehensive programs will contribute greatly in determining the acceptability of long term H-Coal Plant operations.

  20. Multi-Pollutant Emissions Control: Pilot Plant Study of Technologies for Reducing Hg, SO3, NOx and CO2 Emissions

    SciTech Connect

    Michael L. Fenger; Richard A. Winschel

    2005-08-31

    A slipstream pilot plant was built and operated to investigate technology to adsorb mercury (Hg) onto the existing particulate (i.e., fly ash) by cooling flue gas to 200-240 F with a Ljungstrom-type air heater or with water spray. The mercury on the fly ash was then captured in an electrostatic precipitator (ESP). An alkaline material, magnesium hydroxide (Mg(OH){sub 2}), is injected into flue gas upstream of the air heater to control sulfur trioxide (SO{sub 3}), which prevents acid condensation and corrosion of the air heater and ductwork. The slipstream was taken from a bituminous coal-fired power plant. During this contract, Plant Design and Construction (Task 1), Start Up and Maintenance (Task 2), Baseline Testing (Task 3), Sorbent Testing (Task 4), Parametric Testing (Task 5), Humidification Tests (Task 6), Long-Term Testing (Task 7), and a Corrosion Study (Task 8) were completed. The Mercury Stability Study (Task 9), ESP Report (Task 11), Air Heater Report (Task 12) and Final Report (Task 14) were completed. These aspects of the project, as well as progress on Public Outreach (Task 15), are discussed in detail in this final report. Over 90% mercury removal was demonstrated by cooling the flue gas to 200-210 F at the ESP inlet; baseline conditions with 290 F flue gas gave about 26% removal. Mercury removal is sensitive to flue gas temperature and carbon content of fly ash. At 200-210 F, both elemental and oxidized mercury were effectively captured at the ESP. Mg(OH){sub 2} injection proved effective for removal of SO{sub 3} and eliminated rapid fouling of the air heater. The pilot ESP performed satisfactorily at low temperature conditions. Mercury volatility and leaching tests did not show any stability problems. No significant corrosion was detected at the air heater or on corrosion coupons at the ESP. The results justify larger-scale testing/demonstration of the technology. These conclusions are presented and discussed in two presentations given in July and

  1. Population dynamics of iron-oxidizing communities in pilot plants for the treatment of acid mine waters.

    PubMed

    Heinzel, Elke; Janneck, Eberhard; Glombitza, Franz; Schlömann, Michael; Seifert, Jana

    2009-08-15

    The iron-oxidizing microbial community in two pilot plants for the treatment of acid mine water was monitored to investigate the influence of different process parameters such as pH, iron concentration, and retention time on the stability of the system to evaluate the applicability of this treatment technology on an industrial scale. The dynamics of the microbial populations were followed using T-RFLP (terminal restriction fragment length polymorphism) over a period of several months. For a more precise quantification, two TaqMan assays specific for the two prominent groups were developed and the relative abundance of these taxa in the iron-oxidizing community was verified by real-time PCR. The investigations revealed that the iron-oxidizing community was clearly dominated by two groups of Betaproteobacteria affiliated with the poorly known and not yet recognized species "Ferrovum myxofaciens" and with strains related to Gallionella ferruginea, respectively. These taxa dominated the microbial community during the whole investigation period and accelerated the oxidation of ferrous iron despite the changing characteristics of mine waters flowing into the plants. Thus, it is assumed that the treatment technology can also be applied to other mine sites and that these organisms play a crucial role in such treatment systems.

  2. Optimisation of biocide dose as a function of residual biocide in a heat exchanger pilot plant effluent.

    PubMed

    Eguía, Emilio; Trueba, Alfredo; Girón, Alfredo; Río-Calonge, Belén; Otero, Félix; Bielva, Carlos

    2007-01-01

    Biofouling is one of the most serious problems facing numerous industrial processes. In the case of a heat exchanger unit, biological deposits adhering to the inside surface of its tubes reduce heat transfer and, thus, the thermal performance of the cycle. Control of this phenomenon is proving fundamental for both land and marine equipment to operate in optimum working conditions. Hence, it is necessary to apply antifouling methods capable of keeping surfaces free of any kind of biofouling. This paper reports on the behaviour resulting from use of the flow inversion method vs that obtained by using various chemical treatments. The study compares the effectiveness of certain chemical treatments (Na hypochlorite, peracetic acid and a compound formed by Na bromide + Na hypochlorite) for removing a biofouling film that has already formed on the inside surfaces of tubes in a heat exchanger pilot plant. The paper also addresses the issue of optimising the concentration of biocide dose as a function of the residual biocide in order minimise the environmental impact caused by effluent from industrial plants. The results indicate that it is possible to eliminate a biofilm formed on the inside surfaces of tubes by the use of intermittent doses of chemical treatments at low concentrations and over long application times. Furthermore, once the stabilisation phase is reached 6 d after starting the treatment, it is possible to maintain the conditions achieved using only 20% of the initial dosage.

  3. Population dynamics of iron-oxidizing communities in pilot plants for the treatment of acid mine waters

    SciTech Connect

    Elke Heinzel; Eberhard Janneck; Franz Glombitza; Michael Schlmann; Jana Seifert

    2009-08-15

    The iron-oxidizing microbial community in two pilot plants for the treatment of acid mine water was monitored to investigate the influence of different process parameters such as pH, iron concentration, and retention time on the stability of the system to evaluate the applicability of this treatment technology on an industrial scale. The dynamics of the microbial populations were followed using T-RFLP (terminal restriction fragment length polymorphism) over a period of several months. For a more precise quantification, two TaqMan assays specific for the two prominent groups were developed and the relative abundance of these taxa in the iron-oxidizing community was verified by real-time PCR. The investigations revealed that the iron-oxidizing community was clearly dominated by two groups of Betaproteobacteria affiliated with the poorly known and not yet recognized species 'Ferrovum myxofaciens' and with strains related to Gallionella ferruginea, respectively. These taxa dominated the microbial community during the whole investigation period and accelerated the oxidation of ferrous iron despite the changing characteristics of mine waters flowing into the plants. Thus, it is assumed that the treatment technology can also be applied to other mine sites and that these organisms play a crucial role in such treatment systems. 32 refs., 4 figs. 1 tab.

  4. Application of remedy studies to the development of a soil washing pilot plant that uses mineral processing technology: a practical experience.

    PubMed

    Richardson, W S; Phillips, C R; Luttrell, J; Hicks, R; Cox, C

    1999-04-23

    Soil washing employing mineral processing technology to treat radionuclide-contaminated soils has been examined as a remedy alternative to the exclusive excavation, transportation, and disposal of the soil. Successful application depends on a thorough remedy study, employing a systematic tiered approach that is efficient, self-limiting, and cost effective. The study includes: (1) site and soil characterization to determine the basic mineral and physical properties of both the soil and contaminants and to identify their relative associations; (2) treatment studies to evaluate the performance of process units for contaminant separation; (3) conceptual process design to develop a treatment pilot plant; and (4) engineering design to construct, test, and optimize the actual full-scale plant. A pilot plant using soil washing technology for the treatment of radium-contaminated soil was developed, tested, and demonstrated. The plant used particle-size separation to produced a remediated product that represented approximately 50% of the contaminated soil. Subsequently, it was modified for more effective performance and application to soil with alternate characteristics; it awaits further testing. The economic analysis of soil washing using the pilot plant as a model indicates that a remedy plan based on mineral processing technology is very competitive with the traditional alternative employing excavation, transportation, and disposal exclusively, even when disposal costs are modest or when recovery of remediated soil during treatment is low. This paper reviews the tiered approach as it applies to mineral processing technology to treat radionuclide-contaminated soils and a pilot plant developed to test the soil washing process.

  5. PILOT-AND FULL-SCALE DEMONSTRATION OF ADVANCED MERCURY CONTROL TECHNOLOGIES FOR LIGNITE-FIRED POWER PLANTS

    SciTech Connect

    Steven A. Benson; Charlene R. Crocker; Kevin C. Galbreath; Jay R. Gunderson; Mike J. Holmes; Jason D. Laumb; Michelle R. Olderbak; John H. Pavlish; Li Yan; Ye Zhuang; Jill M. Zola

    2004-02-01

    North Dakota lignite-fired power plants have shown a limited ability to control mercury emissions in currently installed electrostatic precipitators (ESPs), dry scrubbers, and wet scrubbers (1). This low level of control can be attributed to the high proportions of Hg{sup 0} present in the flue gas. Speciation of Hg in flue gases analyzed as part of the U.S. Environmental Protection Agency (EPA) information collection request (ICR) for Hg data showed that Hg{sup 0} ranged from 56% to 96% and oxidized mercury ranged from 4% to 44%. The Hg emitted from power plants firing North Dakota lignites ranged from 45% to 91% of the total Hg, with the emitted Hg being greater than 85% elemental. The higher levels of oxidized mercury were only found in a fluidized-bed combustion system. Typically, the form of Hg in the pulverized and cyclone-fired units was dominated by Hg{sup 0} at greater than 85%, and the average amount of Hg{sup 0} emitted from North Dakota power plants was 6.7 lb/TBtu (1, 2). The overall objective of this Energy & Environmental Research Center (EERC) project is to develop and evaluate advanced and innovative concepts for controlling Hg emissions from North Dakota lignite-fired power plants by 50%-90% at costs of one-half to three-fourths of current estimated costs. The specific objectives are focused on determining the feasibility of the following technologies: Hg oxidation for increased Hg capture in wet and dry scrubbers, incorporation of additives and technologies that enhance Hg sorbent effectiveness in ESPs and baghouses, the use of amended silicates in lignite-derived flue gases for Hg capture, and the use of Hg adsorbents within a baghouse. The scientific approach to solving the problems associated with controlling Hg emissions from lignite-fired power plants involves conducting testing of the following processes and technologies that have shown promise on a bench, pilot, or field scale: (1) activated carbon injection (ACI) upstream of an ESP

  6. Field evaluation of a horizontal well recirculation system for groundwater treatment: Pilot test at the Clean Test Site Portsmouth Gaseous Diffusion Plant, Piketon, Ohio

    SciTech Connect

    Muck, M.T.; Kearl, P.M.; Siegrist, R.L.

    1998-08-01

    This report presents the results of field testing a horizontal well recirculation system at the Portsmouth Gaseous Diffusion Plant (PORTS). The recirculation system uses a pair of horizontal wells, one for groundwater extraction and treatment and the other for reinjection of treated groundwater, to set up a recirculation flow field. The induced flow field from the injection well to the extraction well establishes a sweeping action for the removal and treatment of groundwater contaminants. The overall purpose of this project is to study treatment of mixed groundwater contaminants that occur in a thin water-bearing zone not easily targeted by traditional vertical wells. The project involves several research elements, including treatment-process evaluation, hydrodynamic flow and transport modeling, pilot testing at an uncontaminated site, and pilot testing at a contaminated site. The results of the pilot test at an uncontaminated site, the Clean Test Site (CTS), are presented in this report.

  7. Resource Conservation and Recovery Act, Part B permit application [of the Waste Isolation Pilot Plant (WIPP)]. Volume 11, Chapter D, Appendix D4--Chapter D, Appendix D17: Revision 3

    SciTech Connect

    Not Available

    1993-03-01

    This volume contains appendices D4 through D17 which cover the following: Waste Isolation Pilot Plant site environmental report; ecological monitoring program at the Waste Isolation Pilot Plant; site characterization; regional and site geology and hydrology; general geology; dissolution features; ground water hydrology; typical carbon sorption bed efficiency; VOC monitoring plan for bin-room tests; chemical compatibility analysis of waste forms and container materials; probable maximum precipitation; WHIP supplementary roof support system room 1, panel 1; and corrosion risk assessment of the Waste Isolation Pilot Plant ``humid`` test bins.

  8. Consumption and biochemical impact of commercially available plant-derived nutritional supplements. An observational pilot-study on recreational athletes

    PubMed Central

    2012-01-01

    Background A growing consumption of natural (plant-derived) dietary supplements with ergogenic aims, with particular regard for ecdysteroids, phytoestrogens and vegetal sterols, has been registered over the last years among “recreational” athletes. The present study was carried out in order to evaluate the real knowledge of plant-derived nutritional supplements among physically active people as well as their real consumption. Additional aim was to evaluate the effects of these supplements on the health profile of the users. Methods Twenty-three trained subjects who habitually used natural dietary supplements, and 30 matched controls were analyzed for plasma biochemical markers and hormonal profile. Results The laboratory tests revealed the absence of any sign of organ toxicity/damage in both athletes and controls. On the contrary, hormone profiles revealed marked alterations in 15 (65%) out of the 23 of investigated athletes. Specifically, 10 males presented increased plasma levels of progesterone, 15 subjects presented abnormal estrogen levels, including 5 (2 F and 3 M) presenting a “dramatic” increased estrogen values and 2 two males with increased estrogen levels, increased testosterone levels and associated suppression of luteinizing hormone and follicle-stimulating hormone. Conclusions The results of the present study highlighted that the habitual consumption of plant-derived nutritional supplements is frequently associated with significant hormonal alterations both in male and female subjects. Although these biochemical alterations were not associated with signs or symptoms of organ toxicity/damage at the moment of the study, it cannot be excluded that, in the mid/long-term, these subjects would suffer of health problems secondary to chronic exposure to heavily altered hormonal levels. Further large scale studies are needed to confirm the results of this pilot study as well as to investigate the biological mechanisms at the base of the observed

  9. Photocatalytic treatment of an industrial effluent using artificial and solar UV radiation: an operational cost study on a pilot plant scale.

    PubMed

    Durán, A; Monteagudo, J M; San Martín, I

    2012-05-15

    The aim of this work was to study the operation costs of treating a real effluent from an integrated gasification combined cycle (IGCC) power station located in Spain. The study compares different homogeneous photocatalytic processes on a pilot plant scale using different types of radiation (artificial UV or solar UV with a compound parabolic collector). The efficiency of the processes was evaluated by an analysis of the total organic carbon (TOC) removed. The following processes were considered in the study: (i) a photo-Fenton process at an artificial UV pilot plant (with the initial addition of H(2)O(2)), (ii) a modified photo-Fenton process with continuous addition of H(2)O(2) and O(2) to the system and (iii) a ferrioxalate-assisted solar photo-Fenton process at a compound parabolic collector (CPC) pilot plant. The efficiency of these processes in degrading pollutants has been studied previously, and the results obtained in each of those studies have been published elsewhere. The operational costs due to the consumption of electrical energy, reagents and catalysts were calculated from the optimal conditions of each process. The results showed that the solar photo-Fenton system was economically feasible, being able to achieve up to 75% mineralization with a total cost of 6 €/m(3), which can be reduced to 3.6 €/m(3) by subtracting the electrical costs because the IGCC plant is self-sufficient in terms of energy.

  10. Model-based control of MF/UF filtration processes: pilot plant implementation and results.

    PubMed

    Busch, J; Marquardt, W

    2009-01-01

    Membrane micro- and ultrafiltration processes are widespread in water and wastewater treatment applications. Owing to the complex filtration mechanisms and the few available measurement information, they are typically operated using simple control approaches. However, two negative consequences are the sub-optimal performance and the relatively inflexible operation despite dynamic operating conditions. In previous publications, a model-based, adaptive run-to-run control approach for filtration processes has been introduced to improve process performance. It exploits the structure of cyclically operated filtration processes, where one cycle comprises a filtration and a backwashing phase. This contribution focuses on the experimental validation of the approach at a pilot-scale membrane bioreactor for municipal wastewater treatment. Necessary modifications to the approach and details on its implementation are discussed. The controller yields very good results with respect to prediction quality, optimization results, and stability. In addition to improved operational safety, savings of up to 50% are achieved with respect to energy consumption and membrane strain.

  11. Operating a pilot-scale nitrification/distillation plant for complete nutrient recovery from urine.

    PubMed

    Fumasoli, Alexandra; Etter, Bastian; Sterkele, Bettina; Morgenroth, Eberhard; Udert, Kai M

    2016-01-01

    Source-separated urine contains most of the excreted nutrients, which can be recovered by using nitrification to stabilize the urine before concentrating the nutrient solution with distillation. The aim of this study was to test this process combination at pilot scale. The nitrification process was efficient in a moving bed biofilm reactor with maximal rates of 930 mg N L(-1) d(-1). Rates decreased to 120 mg N L(-1) d(-1) after switching to more concentrated urine. At high nitrification rates (640 mg N L(-1) d(-1)) and low total ammonia concentrations (1,790 mg NH4-N L(-1) in influent) distillation caused the main primary energy demand of 71 W cap(-1) (nitrification: 13 W cap(-1)) assuming a nitrogen production of 8.8 g N cap(-1) d(-1). Possible process failures include the accumulation of the nitrification intermediate nitrite and the selection of acid-tolerant ammonia-oxidizing bacteria. Especially during reactor start-up, the process must therefore be carefully supervised. The concentrate produced by the nitrification/distillation process is low in heavy metals, but high in nutrients, suggesting a good suitability as an integral fertilizer.

  12. Nitrosamines in pilot-scale and full-scale wastewater treatment plants with ozonation.

    PubMed

    Gerrity, Daniel; Pisarenko, Aleksey N; Marti, Erica; Trenholm, Rebecca A; Gerringer, Fred; Reungoat, Julien; Dickenson, Eric

    2015-04-01

    Ozone-based treatment trains offer a sustainable option for potable reuse applications, but nitrosamine formation during ozonation poses a challenge for municipalities seeking to avoid reverse osmosis and high-dose ultraviolet (UV) irradiation. Six nitrosamines were monitored in full-scale and pilot-scale wastewater treatment trains. The primary focus was on eight treatment trains employing ozonation of secondary or tertiary wastewater effluents, but two treatment trains with chlorination or UV disinfection of tertiary wastewater effluent and another with full advanced treatment (i.e., reverse osmosis and advanced oxidation) were also included for comparison. N-nitrosodimethylamine (NDMA) and N-nitrosomorpholine (NMOR) were the most prevalent nitrosamines in untreated (up to 89 ng/L and 67 ng/L, respectively) and treated wastewater. N-nitrosomethylethylamine (NMEA) and N-nitrosodiethylamine (NDEA) were detected at one facility each, while N-nitrosodipropylamine (NDPrA) and N-nitrosodibutylamine (NDBA) were less than their method reporting limits (MRLs) in all samples. Ozone-induced NDMA formation ranging from <10 to 143 ng/L was observed at all but one site, but the reasons for the variation in formation remain unclear. Activated sludge, biological activated carbon (BAC), and UV photolysis were effective for NDMA mitigation. NMOR was also removed with activated sludge but did not form during ozonation.

  13. Hydrogen from renewable energy: A pilot plant for thermal production and mobility

    NASA Astrophysics Data System (ADS)

    Degiorgis, L.; Santarelli, M.; Calì, M.

    In the mainframe of a research contract, a feasibility pre-design study of a hydrogen-fuelled Laboratory-Village has been carried out: the goals are the design and the simulation of a demonstration plant based on hydrogen as primary fuel. The hydrogen is produced by electrolysis, from electric power produced by a mix of hydroelectric and solar photovoltaic plants. The plant will be located in a small remote village in Valle d'Aosta (Italy). This country has large water availability from glaciers and mountains, so electricity production from fluent water hydroelectric plants is abundant and cheap. Therefore, the production of hydrogen during the night (instead of selling the electricity to the grid at very low prices) could become a good economic choice, and hydrogen could be a competitive local fuel in term of costs, if compared to oil or gas. The H 2 will be produced and stored, and used to feed a hydrogen vehicle and for thermal purposes (heating requirement of three buildings), allowing a real field test (Village-Laboratory). Due to the high level of pressure requested for H 2 storage on-board in the vehicle, the choice has been the experimental test of a prototype laboratory-scale high-pressure PEM electrolyzer: a test laboratory has been designed, to investigate the energy savings related to this technology. In the paper, the description of the dynamic simulation of the plant (developed with TRNSYS) together with a detailed design and an economic analysis (proving the technical and economical feasibility of the installation) has been carried out. Moreover, the design of the high-pressure PEM electrolyzer is described.

  14. The role of EPS concentration in MBR foaming: analysis of a submerged pilot plant.

    PubMed

    Di Bella, Gaetano; Torregrossa, Michele; Viviani, Gaspare

    2011-01-01

    Foaming in Membrane BioReactor (MBR) is a frequently discussed topic. Some authors reported that the phenomenon is due to filamentous organisms, like at Conventional Activated Sludge (CAS) plants. However, in recent years, other authors reported that the Extra-cellular Polymer Substances (EPSs) concentration is an important factor for controlling foam as well. Nevertheless, even if a number of MBR plants are affected by foaming, presently there are no suitable methods to evaluate the phenomenon. To facilitate the study of this controversial phenomenon in an MBR system, certain foam tests proposed in the past for CASPs were investigated. The results of the tests were able to adequately measure quantity, stability and quality of the foam. In particular, the Scum Index increased proportionally with the EPS concentration and mixed liquor viscosity; Foam Power was mainly correlated with the protein concentration of in the EPS; Foam Rating was also correlated with the EPS concentration.

  15. Internal Technical Report, Safety Analysis Report 5 MW(e) Raft River Pilot Plant

    SciTech Connect

    Brown, E.S.; Homer, G.B.; Spencer, S.G.; Shaber, C.R.

    1980-05-30

    The Raft River Geothermal Site is located in Southern Idaho's Raft River Valley, southwest of Malta, Idaho, in Cassia County. EG and G idaho, Inc., is the DOE's prime contractor for development of the Raft River geothermal field. Contract work has been progressing for several years towards creating a fully integrated utilization of geothermal water. Developmental progress has resulted in the drilling of seven major DOE wells. Four are producing geothermal water from reservoir temperatures measured to approximately 149 C (approximately 300 F). Closed-in well head pressures range from 69 to 102 kPa (100 to 175 psi). Two wells are scheduled for geothermal cold 60 C (140 F) water reinjection. The prime development effort is for a power plant designed to generate electricity using the heat from the geothermal hot water. The plant is designated as the ''5 MW(e) Raft River Research and Development Plant'' project. General site management assigned to EG and G has resulted in planning and development of many parts of the 5 MW program. Support and development activities have included: (1) engineering design, procurement, and construction support; (2) fluid supply and injection facilities, their study, and control; (3) development and installation of transfer piping systems for geothermal water collection and disposal by injection; and (4) heat exchanger fouling tests.

  16. Workshop on instrumentation and analyses for a nuclear fuel reprocessing hot pilot plant

    SciTech Connect

    Babcock, S.M.; Feldman, M.J.; Wymer, R.G.; Hoffman, D.

    1980-05-01

    In order to assist in the study of instrumentation and analytical needs for reprocessing plants, a workshop addressing these needs was held at Oak Ridge National Laboratory from May 5 to 7, 1980. The purpose of the workshop was to incorporate the knowledge of chemistry and of advanced measurement techniques held by the nuclear and radiochemical community into ideas for improved and new plant designs for both process control and inventory and safeguards measurements. The workshop was athended by experts in nuclear and radiochemistry, in fuel recycle plant design, and in instrumentation and analysis. ORNL was a particularly appropriate place to hold the workshop since the Consolidated Fuel Reprocessing Program (CFRP) is centered there. Requirements for safeguarding the special nuclear materials involved in reprocessing, and for their timely measurement within the process, within the reprocessing facility, and at the facility boundaries are being studied. Because these requirements are becoming more numerous and stringent, attention is also being paid to the analytical requirements for these special nuclear materials and to methods for measuring the physical parameters of the systems containing them. In order to provide a focus for the consideration of the workshop participants, the Hot Experimental Facility (HEF) being designed conceptually by the CFRP was used as a basis for consideration and discussions.

  17. Synergistic use of high and low thrust propulsion systems for piloted missions to Mars

    NASA Technical Reports Server (NTRS)

    Gilland, James H.

    1992-01-01

    The use of high thrust, relatively low specific impulse systems, such as chemical or nuclear thermal propulsion, in conjunction with low thrust, high specific impulse nuclear electric propulsion (NEP) was considered for a representative piloted Mars mission. It was concluded that the single burn option in an all-propulsive mission scenario does not yield a significant advantage in reduced trip time for reasonable masses. The multiple burn option allows significant reductions in trip time relative to the NEP system, and may provide a performance advantage over nuclear thermal propulsion, depending upon the system assumptions. The combined systems serve to reduce high thrust systems' sensitivity to mission opportunity. It is considered that 5 kg/kWe systems can provide significant improvements in mass and trip time over the single systems at power levels of 5 to 10 MWe.

  18. Salmonella transfer during pilot plant scale washing and roller conveying of tomatoes.

    PubMed

    Wang, Haiqiang; Ryser, Elliot T

    2014-03-01

    Salmonella transfer during washing and roller conveying of inoculated tomatoes was quantified using a pilot scale tomato packing line equipped with plastic, foam, or brush rollers. Red round tomatoes (2.3 kg) were dip inoculated with Salmonella enterica serovar Typhimurium LT2 (avirulent) (4 log CFU/g), air dried for 2 h, and then washed in sanitizer-free water for 2 min. Inoculated tomatoes were then passed single file over a 1.5-m conveyor equipped with plastic, foam, or brush rollers followed by 25 previously washed uninoculated tomatoes. Tomato samples were collected after 2 min of both washing and roller conveying, with all 25 uninoculated tomatoes collected individually after conveying. Roller surface samples were collected before and after conveying the uninoculated tomatoes. Both tomato and surface samples were quantitatively examined for Salmonella by direct plating or membrane filtration using xylose lysine Tergitol 4 agar. Regardless of the roller type, Salmonella populations on inoculated tomatoes did not significantly (P < 0.05) decrease during contact with the roller conveyors. After conveying uninoculated tomatoes over contaminated foam rollers, 96% of the 25 tomatoes were cross-contaminated with Salmonella at >100 CFU per tomato. With plastic rollers, 24 and 76% of tomatoes were cross-contaminated with Salmonella at 10 to 100 and 1 to 10 CFU per tomato, respectively. In contrast, only 8% of 25 tomatoes were cross-contaminated with brush rollers with Salmonella populations of 1 to 10 CFU per tomato. Overall, cross-contamination was greatest with foam, followed by plastic and brush rollers (P < 0.05). Adding peroxyacetic acid or chlorine to the wash water significantly decreased cross-contamination during tomato conveying, with chlorine less effective in controlling Salmonella on foam compared with plastic and brush rollers.

  19. Performance of a MBR pilot plant treating high strength wastewater subject to salinity increase: analysis of biomass activity and fouling behaviour.

    PubMed

    Di Bella, Gaetano; Di Trapani, Daniele; Torregrossa, Michele; Viviani, Gaspare

    2013-11-01

    Membrane bioreactors produce high quality effluents that could be suitable for reuse. However, when treating high strength wastewater subject to a salinity increase, a modification of biomass characteristics may occur. This circumstance is of importance, since it can have a significant impact in terms of biokinetic as well as fouling behaviour. The aim of the study was to evaluate the performance of a pilot plant MBR, in terms of biomass activity and membrane fouling, fed with high strength synthetic wastewater, when subject to a salinity increase. With normal salinity, the pilot plant showed high removal efficiencies and high biomass respiratory activity. On the other hand, the salinity increase significantly affected the removal efficiency as well as the SMP production. Furthermore, the salinity increase showed a strong effect on biomass activity, reducing in particular the respiration rates of autotrophic populations.

  20. A pilot-plant study of a moving-bed biofilm reactor system using PVA gel as a biocarrier for removals of organic carbon and nitrogen.

    PubMed

    Rouse, J D; Burica, O; Strazar, M; Levstek, M

    2007-01-01

    A pilot-plant study was conducted to evaluate the performance of a moving-bed biofilm reactor process using PVA-gel beads as a biocarrier. Real primary-settled wastewater was fed to the pre-denitrification system and removals of nitrogenous and organic contaminants were evaluated over a 1-year period. The results demonstrated that at a total nitrogen (TN) loading of 18 mg/L.h, a TN removal efficiency in keeping with and even exceeding the theoretical maximum efficiency based on the level of internal recycle, was possible and a nitrification rate of 15 mg/L.h was sustained with a HRT of only 2.5 h at 15 degrees C. Furthermore, soluble COD and BOD5 in the effluent of the pilot plant were reduced to levels well below most regulatory discharge limits. In addition, the possibility of using this biocarrier in a system, including the elimination of waste organic sludge, was discussed.

  1. Simultaneous production of desalinated water and power using a hybrid-cycle OTEC plant

    SciTech Connect

    Panchal, C.B.; Bell, K.J.

    1987-05-01

    A systems study for simultaneous production of desalinated water and electric power using the hybrid-cycle OTEC system was carried out. The hybrid cycle is a combination of open and closed-cycle OTEC systems. A 10 MWe shore-based hybrid-cycle OTEC plant is discussed and corresponding operating parameters are presented. Design and plant operating criteria for adjusting the ratio of water production to power generation are described and their effects on the total system were evaluated. The systems study showed technical advantages of the hybrid-cycle power system as compared to other leading OTEC systems for simultaneous production of desalinated water and electric power generation.

  2. Radiological health review of the Final Environmental Impact Statement Waste Isolation Pilot Plant. Volumes 1 and 2. DOE/EIS-0026

    SciTech Connect

    Not Available

    1981-01-01

    Purpose of the Environmental Evaluation Group (EEG) is to conduct an independent technical evaluation of the potential radiation exposure to people from the proposed Federal radioactive Waste Isolation Pilot Plant (WIPP) near Carlsbad, in order to protect the public health and safety and ensure that there is minimal environmental degradation. Analyses are conducted of reports issued by the US DOE and its contractors, other Federal agencies and other organizations, as they relate to the potential health, safety and environmental impacts from WIPP.

  3. Hydrogeochemical studies of the Rustler Formation and related rocks in the Waste Isolation Pilot Plant Area, Southeastern New Mexico

    SciTech Connect

    Siegel, M.D.; Lambert, S.J.; Robinson, K.L.

    1991-08-01

    Chemical, mineralogical, isotopic, and hydrological studies of the Culebra dolomite member of the Rustler Formation and related rocks are used to delineate hydrochemical facies and form the basis for a conceptual model for post-Pleistocene groundwater flow and chemical evolution. Modern flow within the Culebra in the Waste Isolation Pilot Plant (WIPP) area appears to be largely north-to-south; however, these flow directions under confined conditions are not consistent with the salinity distribution in the region surrounding the WIPP Site. Isotopic, mineralogical, and hydrological data suggest that vertical recharge to the Culebra in the WIPP area and to the immediate east and south has not occurred for several thousand years. Eastward increasing {sup 234}U/{sup 238}U activity ratios suggest recharge from a near-surface Pleistocene infiltration zone flowing from the west-northwest and imply a change in flow direction in the last 30,000 to 12,000 years. 49 refs., 34 figs., 4 tabs.

  4. Laboratory scale and pilot plant study on treatment of toxic wastewater from the petrochemical industry by UASB reactors.

    PubMed

    Stergar, V; Zagorc-Koncan, J; Zgajnar-Gotvanj, A

    2003-01-01

    This research concentrates on the development of an integrated approach to evaluate the possibility of treating very concentrated (COD = 15-20 g/l) and toxic wastewater (nitro-organic effluent) from the petrochemical industry in UASB reactors. A newly developed method utilising a modified Micro-Oxymax respirometer was used to (1) evaluate the inhibitory effects of varying concentrations of nitro-organic effluent on anaerobic granular sludge and (2) to make the proposal of operational parameters for the start up of the continuous process. Subsequently, the continuous tests were undertaken using laboratory scale upflow anaerobic sludge bed reactors to test gradual adaptation of anaerobic biomass to nitro-organic effluent. Practical application of the experimental results of the laboratory-scale continuous tests was evaluated by running the UASB pilot plant. Acceptable COD removal efficiencies were obtained when nitro-organic effluent was diluted with a readily biodegradable substrate up to 80 vol % of nitro-organic effluent in the inlet. The COD removal was 90% and the methane production rate was 4.5 l/d. Wastewater was detoxified and no acute toxicity of the treated wastewater to the anaerobic biomass was detected. This research indicates that anaerobic digestion of the undiluted nitro-organic effluent was not feasible. However, it is possible to blend the nitro-organic effluent with another effluent stream and co-treat these effluents.

  5. Guidebook for performance assessment parameters used in the Waste Isolation Pilot Plant compliance certification application. Volume 2: Appendices

    SciTech Connect

    Howarth, S.M.; Martell, M.A.; Weiner, R.; Lattier, C.

    1998-06-01

    The Waste Isolation Pilot Plant (WIPP) Compliance Certification Application (CCA) Performance Assessment (PA) Parameter Database and its ties to supporting information evolved over the course of two years. When the CCA was submitted to the Environmental Protection Agency (EPA) in October 1996, information such as identification of parameter value or distribution source was documented using processes established by Sandia National Laboratories WIPP Quality Assurance Procedures. Reviewers later requested additional supporting documentation, links to supporting information, and/or clarification for many parameters. This guidebook is designed to document a pathway through the complex parameter process and help delineate flow paths to supporting information for all WIPP CCA parameters. In addition, this report is an aid for understanding how model parameters used in the WIPP CCA were developed and qualified. To trace the source information for a particular parameter, a dual-route system was established. The first route uses information from the Parameter Records package as it existed when the CCA calculations were run. The second route leads from the EPA Parameter Database to additional supporting information.

  6. Computational environment and software configuration management of the 1996 performance assessment for the Waste Isolation Pilot Plant

    SciTech Connect

    FROEHLICH,GARY K.; WILLIAMSON,CHARLES MICHAEL; OGDEN,HARVEY C.

    2000-05-23

    The US Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP), located in southeast New Mexico, is a deep geologic repository for the permanent disposal of transuranic waste generated by DOE defense-related activities. Sandia National Laboratories (SNL), in its role as scientific advisor to the DOE, is responsible for evaluating the long-term performance of the WIPP. This risk-based Performance Assessment (PA) is accomplished in part through the use of numerous scientific modeling codes, which rely for some of their inputs on data gathered during characterization of the site. The PA is subject to formal requirements set forth in federal regulations. In particular, the components of the calculation fall under the configuration management and software quality assurance aegis of the American Society of Mechanical Engineers (ASME) Nuclear Quality Assurance (NQA) requirements. This paper describes SNL's implementation of the NQA requirements regarding configuration management. The complexity of the PA calculation is described, and the rationale for developing a flexible, robust run-control process is discussed. The run-control implementation is described, and its integration with the configuration-management system is then explained, to show how a calculation requiring 37,000 CPU-hours, and involving 225,000 output files totaling 95 Gigabytes, was accomplished in 5 months by 2 individuals, with full traceability and reproducibility.

  7. Air-lift bioreactors for algal growth on flue gas: Mathematical modeling and pilot-plant studies

    SciTech Connect

    Vunjak-Novakovic, G.; Kim, Y.; Wu, X.X.; Berzin, I.; Merchuk, J.C.

    2005-08-03

    Air-lift reactors (ALRs) have great potential for industrial bioprocesses, because of the low level and homogeneous distribution of hydrodynamic shear. One growing field of application is the flue-gas treatment using algae for the absorption of CO{sub 2}, In this paper, we discuss the requirements for photosynthetic biomass growth in an ALR. The effects of the operating variables are analyzed using a mathematical model that accounts for the effects of ALR geometry, fluid flow, and illumination on the biomass growth. On the basis of the ALR principles and the specific requirements of photosynthetic processes, we developed a 'triangular' ALR configuration that is particularly suitable for algal growth. We describe the design and operation of this novel bioreactor and present the first series of experimental data obtained for two different algal species in a pilot-scale unit supplied with flue gases from a small power plant. The measured removal efficiency of CO{sub 2} was significant (82.3 12.5% on sunny days and 50.1 6.5% on cloudy days) and consistent with the increase in the algal biomass.

  8. Odor and volatile organic compound treatment by biotrickling filters: pilot-scale studies at hyperion treatment plant.

    PubMed

    Cox, H H J; Deshusses, M A; Converse, B M; Schroeder, E D; Iranpour, R

    2002-01-01

    A pilot-scale biotrickling filter was installed at the Hyperion Treatment Plant in Los Angeles, California, to study hydrogen sulfide (odor) and volatile organic compound (VOC) removal from headworks waste air. The performance of the reactor was continuously monitored during a 10-month period. At an average empty bed gas residence time of 24 seconds, 10 to 50 ppm of hydrogen sulfide was consistently removed at greater than 98% efficiency, corresponding to an average volumetric elimination capacity of 5.2 g/m3 x h. Concentration profiles over the height of the reactor indicated nearly complete removal in the first section of the reactor, suggesting that elimination capacities up to 30 g/m3 x h could be obtained. The odor reduction (as dilution to threshold) was 98%, which correlated with the efficiency of removal of hydrogen sulfide as the primary pollutant. Volatile organic compounds were present at concentrations up to 225 ppb. Moderate but significant removal of toluene and benzene was observed when the biotrickling filter was operated with pH control to neutralize sulfuric acid production from hydrogen sulfide oxidation. Xylenes and chlorinated VOCs were not removed regardless of experimental conditions in the reactor. The results led to the conclusion that VOC removal is the limiting process in biotrickling filters for the simultaneous removal of hydrogen sulfide and VOCs at publicly owned treatment works.

  9. Preliminary comparison with 40 CFR Part 191, Subpart B for the Waste Isolation Pilot Plant, December 1990

    SciTech Connect

    Bertram-Howery, S.G.; Marietta, M.G.; Rechard, R.P.; Anderson, D.R. ); Swift, P.N. ); Baker, B.L. ); Bean, J.E. Jr.; McCurley, R.D.; Rudeen, D.K. ); Beyeler, W.; Brinster, K.F.; Guzowski, R.V.; Sch

    1990-12-01

    The Waste Isolation Pilot Plant (WIPP) is planned as the first mined geologic repository for transuranic (TRU) wastes generated by defense programs of the United States Department of Energy (DOE). Before disposing of waste at the WIPP, the DOE must evaluate compliance with the United states Environmental Protection Agency's (EPA) Standard, Environmental Radiation Protection Standards for Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes (40 CFR Part 191, US EPA, 1985). Sandia National Laboratories (SNL) is evaluating long-term performance against criteria in Subpart B of the Standard. Performance assessment'' as used in this report includes analyses for the Containment Requirements ({section} 191.13(a)) and the Individual Protection Requirements ({section} 191.15). Because proving predictions about future human actions or natural events is not possible, the EPA expects compliance to be determined on the basis of specified quantitative analyses and informed, qualitative judgment. The goal of the WIPP performance-assessment team at SNL is to provide as detailed and thorough a basis as practical for the quantitative aspects of that decision. This report summarizes SNL's late-1990 understanding of the WIPP Project's ability to evaluate compliance with Subpart B. 245 refs., 88 figs., 23 tabs.

  10. Removal of viruses, parasitic protozoa and microbial indicators in conventional and membrane processes in a wastewater pilot plant.

    PubMed

    Ottoson, J; Hansen, A; Björlenius, B; Norder, H; Stenström, T A

    2006-04-01

    The aim of this study was to investigate variations in the occurrence and removal of enterovirus and norovirus genomes, Giardia cysts, Cryptosporidium oocysts and the most commonly used faecal indicators in a Swedish wastewater pilot plant. Paired samples were taken from the inlet and outlet of each treatment line: tertiary filtration, membrane bioreactor (MBR) and upflow anaerobic sludge blankets (UASB). (Oo)cysts and indicators were enumerated using standard methods and viruses using RT-PCR. Giardia cysts and enteroviruses were constantly detected, mean numbers 10(3.11) cysts and 10(4.0) PCR units L(-1), respectively. Oocysts were found in 5/19 samples, mean number 5 L(-1). Noroviruses were found in 6/7 influent samples, with an average titre of 10(3.28)L(-1), during winter, but only in 2/15 in the rest of the year (mean 200 L(-1)). MBR treatment removed indicators more efficiently than did the other two lines, with 5log removal of E. coli. Human virus genome removal did not differ between the MBR and tertiary treatment line. Microorganism removal in UASB was significantly lower for all the organisms studied. E. coli, enterococci and Cl. perfringens removal was correlated (p<0.05) with enterovirus genome removal, with R-values around 0.4. However, values for removal of indicators were more strongly correlated to each other. Removal of viruses based on enumeration using RT-PCR probably underestimates infectious virion removal.

  11. Anthocyanin and flavonoid production from Perilla frutescens: pilot plant scale processing including cross-flow microfiltration and reverse osmosis.

    PubMed

    Meng, Linghua; Lozano, Yves; Bombarda, Isabelle; Gaydou, Emile; Li, Bin

    2006-06-14

    Extraction and concentration at a pilot plant scale of anthocyanins and flavonoids from Perilla frutescens var. frutescens harvested in the Guangzhou area of China were investigated. The study of extraction efficiency using mineral acids and organic acids showed that 0.01 mol/L nitric acid was the most suitable to extract flavonoids from this slightly red leaf cultivar. The red extract contained 12 mg/L (as cyanidin equivalent) anthocyanins and other flavones. The multistep process included cross-flow microfiltration (CFM) with a ceramic type membrane, reverse osmosis (RO), and rotating evaporation (RE). The filtration fluxes were high and constant for CFM (150 L/h/m2 at 0.6 b) and for RO (22 L/h/m2 at 40 b). The red extract was concentrated 9.4 times by RO and then 5.4 times by RE. It contained 422 mg/L anthocyanins, representing 77% of the total extracted anthocyanin. The proportion of flavonoids was found unchanged during processing. The concentrated extract showed a pH of 2.7, and its free acidity was found to be 46% of the acidity added for extraction, because of the buffering capacity of the extract. At the concentration level reached, a crystallized deposit occurred and was identified as tartrate.

  12. Fate of zinc oxide and silver nanoparticles in a pilot wastewater treatment plant and in processed biosolids.

    PubMed

    Ma, Rui; Levard, Clément; Judy, Jonathan D; Unrine, Jason M; Durenkamp, Mark; Martin, Ben; Jefferson, Bruce; Lowry, Gregory V

    2014-01-01

    Chemical transformations of silver nanoparticles (Ag NPs) and zinc oxide nanoparticles (ZnO NPs) during wastewater treatment and sludge treatment must be characterized to accurately assess the risks that these nanomaterials pose from land application of biosolids. Here, X-ray absorption spectroscopy (XAS) and supporting characterization methods are used to determine the chemical speciation of Ag and Zn in sludge from a pilot wastewater treatment plant (WWTP) that had received PVP coated 50 nm Ag NPs and 30 nm ZnO NPs, dissolved metal ions, or no added metal. The effects of composting and lime and heat treatment on metal speciation in the resulting biosolids were also examined. All added Ag was converted to Ag2S, regardless of the form of Ag added (NP vs ionic). Zn was transformed to three Zn-containing species, ZnS, Zn3(PO4)2, and Zn associated Fe oxy/hydroxides, also regardless of the form of Zn added. Zn speciation was the same in the unamended control sludge. Ag2S persisted in all sludge treatments. Zn3(PO4)2 persisted in sludge and biosolids, but the ratio of ZnS and Zn associated with Fe oxy/hydroxide depended on the redox state and water content of the biosolids. Limited differences in Zn and Ag speciation among NP-dosed, ion-dosed, and control biosolids indicate that these nanoparticles are transformed to similar chemical forms as bulk metals already entering the WWTP.

  13. A pilot plant two-phase anaerobic digestion system for bioenergy recovery from swine wastes and garbage.

    PubMed

    Feng, Chuanping; Shimada, Sadoru; Zhang, Zhenya; Maekawa, Takaaki

    2008-01-01

    A pilot plant bioenergy recovery system from swine waste and garbage was constructed. A series of experiments was performed using swine feces (SF); a mixture of swine feces and urine (MSFU); a mixture of swine feces, urine and garbage (MSFUG); garbage and a mixture of urine and garbage (AUG). The system performed well for treating the source materials at a high organic loading rate (OLR) and short hydraulic retention time (HRT). In particular, the biogas production for the MSFUG was the highest, accounting for approximately 865-930 L kg(-1)-VS added at the OLR of 5.0-5.3 kg-VS m(-3) day(-1) and the HRT of 9 days. The removal of VS was 67-75%, and that of COD was 73-74%. Therefore, co-digestion is a promising method for the recovery of bioenergy from swine waste and garbage. Furthermore, the results obtained from this study provide fundamental information for scaling up a high-performance anaerobic system in the future.

  14. Wellbore enlargement investigation: Potential analogs to the Waste Isolation Pilot Plant during inadvertent intrusion of the repository

    SciTech Connect

    Boak, D.M.; Dotson, L.; Aguilar, R.

    1997-01-01

    This study involved the evaluation and documentation of cases in which petroleum wellbores were enlarged beyond the nominal hole diameter as a consequence of erosion during exploratory drilling, particularly as a function of gas flow into the wellbore during blowout conditions. A primary objective was to identify analogs to potential wellbore enlargement at the Waste Isolation Pilot Plant (WIPP) during inadvertent human intrusion. Secondary objectives were to identify drilling scenarios associated with enlargement, determine the physical extent of enlargement, and establish the physical properties of the formation in which the enlargement occurred. No analogs of sufficient quality to establish quantitative limits on wellbore enlargement at the WIPP disposal system were identified. However, some information was obtained regarding the frequency of petroleum well blowouts and the likelihood that such blowouts would bridge downhole, self-limiting the surface release of disposal-system material. Further work would be necessary, however, to determine the conditions under which bridging could occur and the extent to which the bridging might be applicable to WIPP. In addition, data on casing sizes of petroleum boreholes in the WIPP vicinity support the use of a 12-{1/4} inch borehole size in WIPP performance assessment calculations. Finally, although data are limited, there was no evidence of significant wellbore enlargement in any of three blowouts that occur-red in wellbores in the Delaware Basin (South Culebra Bluff Unit No. 1, Energy Research and Development Administration (ERDA) 6, and WIPP 12).

  15. Seismic Response of a Deep Underground Geologic Repository for Nuclear Waste at the Waste Isolation Pilot Plant in New Mexico

    SciTech Connect

    Sanchez, P.E.

    1998-11-02

    The Waste Isolation Pilot Plant (WIPP) is a deep underground nuclear waste repository certified by the U.S. Environmental Protection Agency ,(EPA) to store transuranic defense-related waste contaminated by small amounts of radioactive materials. Located at a depth of about 655 meters below the surface, the facility is sited in southeastern New Mexico, about 40 Department of Energy underground facilities, waste disposal. kilometers east of the city of Carlsbad, New Mexico. The U.S. (DOE) managed the design and construction of the surface and and remains responsible for operation and closure following The managing and operating contractor for the DOE at the WIPP, Westinghouse Electric Corporation, maintains two rechmiant seismic monitoring systems located at the surface and in the underground. This report discusses two earthquakes detected by the seismic monitoring system, one a duratior magnitude 5.0 (Md) event located approximately 60 km east-southeast of the facility, and another a body-wave magnitude 5.6 (rob) event that occurred approximately 260 kilometers to the south-southeast.

  16. Preliminary Systems Design Study assessment report. Volume 6, Waste Isolation Pilot Plant and transportation package acceptable concepts

    SciTech Connect

    Mayberry, J.L.; Feizollahi, F.; Del Signore, J.C.

    1992-01-01

    The System Design Study (SDS), part of the Waste Technology Development Department at the Idaho National Engineering Laboratory (INEL), examined techniques for the remediation of hazardous and transuranic waste stored at Radioactive Waste Management Complex`s Subsurface Disposal Area at the INEL. Using specific technologies, system concepts for treating the buried waste and the surrounding contaminated soil were evaluated. Evaluation included implementability, effectiveness, and cost. The SDS resulted in the development of technology requirements including demonstration, testing, and evaluation activities needed for implementing each concept. This volume contains introduction section containing a brief SDS background and lists the general assumptions and considerations used during the development of the system concepts. The introduction section is followed by sections describing two system concepts that produce a waste form in compliance with the Waste Isolation Pilot Plant (WIPP) Waste Acceptance Criteria (WAC) and transportation package (TRAMPAC) requirements. This system concept category is referred to as Waste Form 4, ``WIPP and TRAMPAC Acceptable.`` The following two system concepts are under this category: Sort, Treat, and Repackage System (4-BE-2); Volume Reduction and Packaging System (4-BE-4).

  17. DRSPALL: Impact of the Modification of the Numerical Spallings Model on Waste Isolation Pilot Plant Performance Assessment.

    SciTech Connect

    Kicker, Dwayne Curtis; Herrick, Courtney G.; Zeitler, Todd; Malama, Bwalya; Rudeen, David Keith; Gilkey, Amy P.

    2016-01-01

    The numerical code DRSPALL (from direct release spallings) is written to calculate the volume of Waste Isolation Pilot Plant (WIPP) solid waste subject to material failure and transport to the surface as a result of a hypothetical future inadvertent drilling intrusion. An error in the implementation of the DRSPALL finite difference equations was discovered as documented in Software Problem Report (SPR) 13-001. The modifications to DRSPALL to correct the finite difference equations are detailed, and verification and validation testing has been completed for the modified DRSPALL code. The complementary cumulative distribution function (CCDF) of spallings releases obtained using the modified DRSPALL is higher compared to that found in previous WIPP performance assessment (PA) calculations. Compared to previous PAs, there was an increase in the number of vectors that result in a nonzero spallings volume, which generally translates to an increase in spallings releases. The overall mean CCDFs for total releases using the modified DRSPALL are virtually unchanged, thus the modification to DRSPALL did not impact WIPP PA calculation results.

  18. Draft Title 40 CFR 191 compliance certification application for the Waste Isolation Pilot Plant. Volume 3: Appendix BIR Volume 1

    SciTech Connect

    1995-03-31

    The Waste Isolation Pilot Plant (WIPP) Transuranic Waste Baseline Inventory Report (WTWBIR) establishes a methodology for grouping wastes of similar physical and chemical properties, from across the US Department of Energy (DOE) transuranic (TRU) waste system, into a series of ``waste profiles`` that can be used as the basis for waste form discussions with regulatory agencies. The majority of this document reports TRU waste inventories of DOE defense sites. An appendix is included which provides estimates of commercial TRU waste from the West Valley Demonstration Project. The WIPP baseline inventory is estimated using waste streams identified by the DOE TRU waste generator/storage sites, supplemented by information from the Mixed Waste Inventory Report (MWIR) and the 1994 Integrated Data Base (IDB). The sites provided and/or authorized all information in the Waste Stream Profiles except the EPA (hazardous waste) codes for the mixed inventories. These codes were taken from the MWIR (if a WTWBIR mixed waste stream was not in MWIR, the sites were consulted). The IDB was used to generate the WIPP radionuclide inventory. Each waste stream is defined in a waste stream profile and has been assigned a waste matrix code (WMC) by the DOE TRU waste generator/storage site. Waste stream profiles with WMCs that have similar physical and chemical properties can be combined into a waste matrix code group (WMCG), which is then documented in a site-specific waste profile for each TRU waste generator/storage site that contains waste streams in that particular WMCG.

  19. [Establishment of optimal conditions at laboratory and pilot plant levels for the preparation of a protein isolated from Lupinus mutabilis].

    PubMed

    Rodríguez Pacheco, T; Aliaga, T; Schoeneberger, H; Gross, R

    1981-12-01

    Laboratory conditions were first investigated to determine are optimum processing parameters for the preparation of a protein isolate from the ground, defatted, commercial flakes of Lupinus mutabilis. The extraction variables were: pH (2-10); solvent to lupine ratio (5:1 to 40:1); temperature (28 degrees C - 60 degrees C) and time (10-50 min). The isoelectric point of the lupine protein was found to be pH 4.5 with a protein solubility higher than 80% above pH 8.0. Using 70-100 mesh, ground defatted flakes, and extracting at pH 8.7 for 60 min, a protein isolate was obtained on acidification to pH 4.5 which was 99.8 protein (dry basis), compared to 55.25% protein for the original material. This protein isolate represented 32% of the initial material and 57.6% of the initial nitrogen. When making pilot plant assays we found that the yield of protein isolate decreased to 20.4% of the original material and 36.4% of the initial nitrogen. The protein efficiency ratio for the protein isolate was 2.15 when supplemented with methionine, and had a digestibility of 89.33

  20. Interpretation of in-situ pressure and flow measurements of the Salado Formation at the Waste Isolation Pilot Plant

    SciTech Connect

    Howarth, S.M.; Peterson, E.W.; Lagus, P.L.; Lie, K.; Finley, S.J.; Nowak, E.J.

    1991-01-01

    This paper describes preliminary interpretation of in-situ pressure and flow measurements of the Salado Formation at the Waste Isolation Pilot Plant (WIPP). The WIPP facility is located 660 m underground in the Salado, a bedded salt deposit. Shut-in pressure tests were conducted prior to, and subsequent to, the mining of a circular drift in order to evaluate excavation effects on pore pressure, permeability, and host rock heterogeneity. Borehole deformation was measured during these tests and used to correct for changes in the test region volume due to salt creep effects. Preliminary pre-excavation results indicate that the flow properties of this layered host rock are heterogeneous. Resulting pore pressures range from 1 to 14 MPa and permeabilities range from below measurable to about 1 nanodarcy. Normalized borehole diameter change rates were between {minus}4 and 63 microstrains/day. Shut-in pressures and borehole diameters in all test boreholes were affected by the excavation of Room Q coincident with the advances of the boring machine. Preliminary results from post-excavation test results show decreased pore pressures compared to pre-excavation values.

  1. Mechanisms governing the direct removal of wastes from the Waste Isolation Pilot Plant repository caused by exploratory drilling

    SciTech Connect

    Berglund, J.W.

    1992-12-01

    Two processes are identified that can influence the quantity of wastes brought to the ground surface when a waste disposal room of the Waste Isolation Pilot Plant is inadvertently penetrated by an exploratory borehole. The first mechanism is due to the erosion of the borehole wall adjacent to the waste caused by the flowing drilling fluid (mud); a quantitative computational model based upon the flow characteristics of the drilling fluid (laminar or turbulent) and other drilling parameters is developed and example results shown. The second mechanism concerns the motion of the waste and borehole spall caused by the flow of waste-generated gas to the borehole. Some of the available literature concerning this process is discussed, and a number of elastic and elastic-plastic finite-difference and finite-element calculations are described that confirm the potential importance of this process in directly removing wastes from the repository to the ground surface. Based upon the amount of analysis performed to date, it is concluded that it is not unreasonable to expect that volumes of waste several times greater than that resulting from direct cutting of a gauge borehole could eventually reach the ground surface. No definitive quantitative model for waste removal as a result of the second mechanism is presented; it is concluded that decomposed waste constitutive data must be developed and additional experiments performed to assess further the full significance of this latter mechanism.

  2. Numerical Investigation of 3-D Transient Combusting Flow in a 1.2MWth Pilot Power Plant

    NASA Astrophysics Data System (ADS)

    Nikolopoulos, A.; Rampldls, I.; Nlkelopoules, N.; Grammells, P.; Kakaras, E.

    As industrial Circulating Fluidized bed Combustors (CFBCs) tend to be scaled up, numerous design and operating problems emerge. At the same time uncertainties which concern hydrodynamics, combustion and pollutants formation mechanisms, come in to sight. Along with experience, CFD analysis can play crucial role providing further insight on the complex multiphase combusting flow occurring in CFBCs. This work aims to present a methodology for CFBCs comprehensive modeling, taking into consideration the coupling of hydrodynamics — heat transfer — chemical phenomena that take place in the bed. A combination of acceptable accuracy with high computational efficiency was also an objective. For this purpose, a simple combustion mechanism was integrated in an isothermal model and applied on a 1.2 MWth pilot plant. In this comprehensive model gas, inert-material and fuel are taken into consideration, as three discrete, pure eulerian phases. Solids inventory in the riser as well as temperature of the bed were predicted with satisfactory accuracy. Moreover, major chemical components as O2 and CO2 concentrations were predicted along the bed with acceptable accuracy. Concluding, the developed CFD model is capable of efficiently modeling a CFBC. However in order to further increase total accuracy, the need for improved closure equations for the set ofPartial Differential Equations solved was made obvious. Finally, the computational cost for such modeling was found extremely high but not prohibitive for large scale CFBC simulations.

  3. Uncertainty and sensitivity analyses for gas and brine migration at the Waste Isolation Pilot Plant, May 1992

    SciTech Connect

    Helton, J.C.; Bean, J.E.; Butcher, B.M.; Garner, J.W.; Vaughn, P.; Schreiber, J.D.; Swift, P.N.

    1993-08-01

    Uncertainty and sensitivity analysis techniques based on Latin hypercube sampling, partial correlation analysis, stepwise regression analysis and examination of scatterplots are used in conjunction with the BRAGFLO model to examine two phase flow (i.e., gas and brine) at the Waste Isolation Pilot Plant (WIPP), which is being developed by the US Department of Energy as a disposal facility for transuranic waste. The analyses consider either a single waste panel or the entire repository in conjunction with the following cases: (1) fully consolidated shaft, (2) system of shaft seals with panel seals, and (3) single shaft seal without panel seals. The purpose of this analysis is to develop insights on factors that are potentially important in showing compliance with applicable regulations of the US Environmental Protection Agency (i.e., 40 CFR 191, Subpart B; 40 CFR 268). The primary topics investigated are (1) gas production due to corrosion of steel, (2) gas production due to microbial degradation of cellulosics, (3) gas migration into anhydrite marker beds in the Salado Formation, (4) gas migration through a system of shaft seals to overlying strata, and (5) gas migration through a single shaft seal to overlying strata. Important variables identified in the analyses include initial brine saturation of the waste, stoichiometric terms for corrosion of steel and microbial degradation of cellulosics, gas barrier pressure in the anhydrite marker beds, shaft seal permeability, and panel seal permeability.

  4. From laboratory to pilot plant: the solid-state process development of a highly potent cathepsin S/K inhibitor.

    PubMed

    Feth, Martin Philipp; Heyse, Winfried; Baumgartner, Bruno; Nagel, Norbert; Tappertzhofen, Christoph; Olpp, Thomas; Jurascheck, Jörg; Ulrich, Joachim; Helmdach, Lydia; Petzoldt, Christine

    2013-04-01

    The solid-state development for the low dose drug molecule SAR114137, a selective and reversible inhibitor of cysteine cathepsin S/K, is reported. Six polymorphic forms as well as various solvate phases were discovered by an extensive polymorphism screening. The solid phase characterizations revealed that phase 1, from which a single crystal structure could be obtained, is the thermodynamically most stable form and therefore it was chosen for pharmaceutical development. The successful scale-up from development laboratory into pilot plant for the crystallization and drying processes is presented. Testing of different drying techniques, like agitated drying in conical or filter dryers as well as spray drying, proved them to be very promising alternatives to the conventional tray drying process and might be used during the industrialization phase of the project. The use of online analytical tools (e.g., Raman spectroscopy) for a better process understanding and as tools for process optimization is shown. Furthermore, wet milling by ultrasound was performed on laboratory scale and discussed as potential option to reach the desired particle size distribution necessary for a good content uniformity of the API in an oral formulation.

  5. Partial degradation of five pesticides and an industrial pollutant by ozonation in a pilot-plant scale reactor.

    PubMed

    Maldonado, M I; Malato, S; Pérez-Estrada, L A; Gernjak, W; Oller, I; Doménech, Xavier; Peral, José

    2006-11-16

    Aqueous solutions of a mixture of several pesticides (alachlor, atrazine, chlorfenvinphos, diuron and isoproturon), considered PS (priority substances) by the European Commission, and an intermediate product of the pharmaceutical industry (alpha-methylphenylglycine, MPG) chosen as a model industrial pollutant, have been degraded at pilot-plant scale using ozonation. This study is part of a large research project [CADOX Project, A Coupled Advanced Oxidation-Biological Process for Recycling of Industrial Wastewater Containing Persistent Organic Contaminants, Contract No.: EVK1-CT-2002-00122, European Commission, http://www.psa.es/webeng/projects/cadox/index.html] founded by the European Union that inquires into the potential coupling between chemical and biological oxidations for the removal of toxic or non-biodegradable contaminants from water. The evolution of pollutant concentration, TOC mineralization, generation of inorganic species and consumption of O3 have been followed in order to visualize the chemical treatment effectiveness. Although complete mineralization is hard to accomplish, and large amounts of the oxidant are required to lower the organic content of the solutions, the possibility of ozonation cannot be ruled out if partial degradation is the final goal wanted. In this sense, Zahn-Wellens biodegradability tests of the ozonated MPG solutions have been performed, and the possibility of a further coupling with a secondary biological treatment for complete organic removal is envisaged.

  6. EM Methods Applied for the Characterization and Monitoring of the Hontomin (Spain) CO2 Storage Pilot Plant

    NASA Astrophysics Data System (ADS)

    Ledo, Juanjo; Queralt, Pilar; Marcuello, Alex; Ogaya, Xenia; Vilamajo, Eloi; Bosch, David; Escalas, Lena; Piña, Perla

    2013-04-01

    The work presented here correspond to an on-going project in the frame of the development of a pilot plant for CO2 storage in a deep saline aquifer funded by Fundación Ciudad de la Energía-CIUDEN (http://www.ciuden.es/) on behalf of the Spanish Government. The main objective of the research Project is to monitor the CO2 migration within the reservoir during and after the injection as well as testing and evaluating different EM monitoring methods. In this way, a good characterization of the zone is imperative to perceive and quantify, as soon as possible, any change owing to the CO2 injection. Among all geophysical techniques, electrical and electromagnetic methods are especially useful and meaningful to monitor the CO2 plume since these methods are sensitive to the electrical conductivity of the pore fluid. The presence of CO2 inside the pore will replace a fraction of saline fluid within the storage aquifer, reducing the effective volume available for ionic transport. As a consequence, the bulk electrical resistivity of the rock is expected to increase significantly. The proposed EM techniques are the following: 1- Magnetotelluric method, 2-Cross-hole electrical resistivity tomography, 3- Control source electromagnetics. Moreover laboratory experiments are being carried out to monitor the CO2 flux inside sample cores using ERT.

  7. Review and perspectives on spallings release models in the 1996 performance assessment for the Waste Isolation Pilot Plant

    SciTech Connect

    Knowles, M.K; Hansen, F.D.; Thompson, T.W.; Schatz, J.F.; Gross, M.

    2000-05-22

    The Waste Isolation Pilot Plant was licensed for disposal of transuranic wastes generated by the US Department of Energy. The facility consists of a repository mined in a bedded salt formation, approximately 650 m below the surface. Regulations promulgated by the US Environmental Protection Agency require that performance assessment calculations for the repository include the possibility that an exploratory drilling operation could penetrate the waste disposal areas at some time in the future. Release of contaminated solids could reach the surface during a drilling intrusion. One of the mechanisms for release, known as spallings, can occur if gas pressures in the repository exceed the hydrostatic pressure of a column of drilling mud. Calculation of solids releases for spallings depends critically on the conceptual models for the waste, for the spallings process, and assumptions regarding driller parameters and practices. The paper presents a review of the evolution of these models during regulatory review of the Compliance Certification Application for the repository. A summary and perspectives on the implementation of conservative assumptions in model development are also provided.

  8. Analysis of solutes in groundwaters from the Rustler Formation at and near the Waste Isolation Pilot Plant site

    SciTech Connect

    Robinson, K.L.

    1997-09-01

    Between 1976 and 1986, groundwater samples from more than 60 locations in the vicinity of the Waste Isolation Pilot Plant site were collected and analyzed for a variety of major, minor, and trace solutes. Most of the samples were from the Rustler Formation (the Culebra Dolomite, the Magenta Dolomite, or the zone at the contact between the Rustler and underlying Salado Formations) or the Dewey Lake Red Beds. The analytical data from the laboratories are presented here with accompanying discussions of sample collection methods, supporting field measurements, and laboratory analytical methods. A comparison of four data sets and a preliminary evaluation of the data for the major solutes (Cl{sup {minus}}, SO{sub 4}{sup {minus}2}, Na, K, Ca, and Mg) shows that the data for samples analyzed by UNC/Bendix for SNL seem to be the most reliable, but that at some locations, samples representative of the native, unperturbed groundwater have not been collected. At other locations, the water chemistry has apparently changed between sampling episodes.

  9. Sunlight photo-assisted TiO₂-based pilot plant scale remediation of (simulated) contaminated aquatic sites.

    PubMed

    Oyama, Toshiyuki; Takeuchi, Masashi; Yanagisawa, Ippei; Koike, Takayoshi; Serpone, Nick; Hidaka, Hisao

    2010-01-01

    A tubular-type solar photoreactor system powered by commercial solar panels and consisting of six 20-tube modules (Pyrex glass) to mimic a pilot plant scale configuration was designed and constructed to examine the remediation of simulated wastewaters contaminated with various classes of organic pollutants such as endocrine disruptors (e.g. bisphenol A), anionic surfactants (sodium butylnaphthalenesulfonate and sodium dodecyl- benzenesulfonate), herbicides (e.g. 2,4-dichlorophenoxyacetic acid) and a commercial dishwasher detergent. Photo-oxidative processes followed first-order kinetics expressed in terms of the total light energy (in kJ) that impinged on the photoreactor. The influence of TiO₂ loading and circulation flow rate of the wastewaters on the dynamics of the photo-oxidation to mineralization (loss of total organic carbon, TOC, or formation of sulfate ions) was investigated. The optimal operational parameters were: TiO₂ loading, 2 g L⁻¹; circulation flow rate, 7.5 L min⁻¹. On a sunny day, near- quantitative mineralization of the contaminants was achieved after only 4 h of irradiation that corresponded to an accumulated energy of ca 1380 kJ.

  10. Laboratory evaluation of colloidal actinide transport at the Waste Isolation Pilot Plant (WIPP): 1. crushed-dolomite column flow...

    SciTech Connect

    Yelton, W.G.; Behl, Y.K.; Kelly, J.W.; Dunn, M.; Gillow, J.B.; Francis, A.J.; Papenguth, H.W.

    1996-12-31

    Colloid-facilitated transport of Pu, Am, U, Th, and Np has been recognized as a potentially important phenomenon affecting the performance of the Waste Isolation Pilot Plant (WIPP) facility being developed for safe disposal of transuranic radioactive waste. In a human intrusion scenario, actinide-bearing colloidal particles may be released from the repository and be transported by brines (approximately 0.8 to 3 molal ionic strength) through the Culebra, a thin fractured microcrystalline (mean grain size 2 micrometers) dolomite aquifer overlying the repository. Transport experiments were conducted using sieved, uniformly packed crushed Culebra rock or nonporous dolomite cleavage rhombohedra. Experiments with mineral fragments and fixed and live WIPP-relevant bacteria cultures showed significant levels of retardation due to physical filtration effects. Humic substances were not attenuated by the Culebra dolomite. Comparison of elution curves of latex microspheres in columns prepared with microcrystalline rock and nonporous rock showed minimal effect of Culebra micropores on colloid transport. These data form part of the basis to parameterize numerical codes being used to evaluate the performance of the WIPP.

  11. The Waste Isolation Pilot Plant - An International Center of Excellence for ''Training in and Demonstration of Waste Disposal Technologies''

    SciTech Connect

    Matthews, Mark L.; Eriksson, Leif G.

    2003-02-25

    The Waste Isolation Pilot Plant (WIPP) site, which is managed and operated by the United States (U.S.) Department of Energy (USDOE) Carlsbad Field Office (CBFO) and located in the State of New Mexico, presently hosts an underground research laboratory (URL) and the world's first certified and operating deep geological repository for safe disposition of long-lived radioactive materials (LLRMs). Both the URL and the repository are situated approximately 650 meters (m) below the ground surface in a 250-million-year-old, 600-m-thick, undisturbed, bedded salt formation, and they have been in operation since 1982 and 1999, respectively. Founded on long-standing CBFO collaborations with international and national radioactive waste management organizations, since 2001, WIPP serves as the Center of Excellence in Rock Salt for the International Atomic Energy Agency's (IAEA's) International Network of Centers on ''Training in and Demonstration of Waste Disposal Technologies in Underground Research Facilities'' (the IAEA Network). The primary objective for the IAEA Network is to foster collaborative projects among IAEA Member States that: supplement national efforts and promote public confidence in waste disposal schemes; contribute to the resolution of key technical issues; and encourage the transfer and preservation of knowledge and technologies.

  12. Instrumentation of the thermal/structural interactions in situ tests at the Waste Isolation Pilot Plant (WIPP)

    SciTech Connect

    Munson, D.E.; Hoag, D.L.; Blankenship, D.A.; DeYonge, W.F.; Schiermeister, D.M.

    1997-04-01

    The Department of Energy has constructed the Waste Isolation Pilot Plant (WIPP) to develop the technology for the disposal of radioactive waste from defense programs. Sandia National Laboratories had the responsibility for the experimental activities at the WIPP and fielded several large-scale Thermal/Structural Interactions (TSI) in situ tests to validate techniques used to predict repository performance. The instrumentation of these tests involved the placement of over 4,200 gages including room closure gages, borehole extensometers, stress gages, borehole inclinometers, fixed reference gages, borehole strain gages, thermocouples, thermal flux meters, heater power gages, environmental gages, and ventilation gages. Most of the gages were remotely read instruments that were monitored by an automated data acquisition system, but manually read instruments were also used to provide early deformation information and to provide a redundancy of measurement for the remote gages. Instruments were selected that could operate in the harsh environment of the test rooms and that could accommodate the ranges of test room responses predicted by pretest calculations. Instruments were tested in the field prior to installation at the WIPP site and were modified to improve their performance. Other modifications were made to gages as the TSI tests progressed using knowledge gained from test maintenance. Quality assurance procedures were developed for all aspects of instrumentation including calibration, installation, and maintenance. The instrumentation performed exceptionally well and has produced a large quantity of quality information.

  13. Chemical, biomedical and ecological studies of SRC-I materials from the Fort Lewis Pilot Plant: a status report

    SciTech Connect

    Mahlum, D.D.

    1981-01-01

    This document discusses studies performed with solvent refined coal (SRC) materials obtained from the Fort Lewis Pilot Plant during operation in the SRC-I mode. The development of analytical methodology is presented as well as results obtained from the application of these methods to light oil (LO), wash solvent (WS) and process solvent (PS). Results of cellular and animal studies with LO, WS and PS are included, along with a description of methods for the generation and characterization of LO and PS aerosols, and for exposing rats, mice and guinea pigs to these aerosols. The effects of SRC-I product on seed germination and plant growth which have also been studied are discussed. The SRC-I product, feed coal and the mineral residue have been analyzed for organic and inorganic constituents. The higher-boiling-point material, PS, exhibited significant mutagenic activity in the Ames assay; LO and WS were inactive. Process solvent also caused transformation of cultured Syrian hamster embryo cells. Additional chemical fractionation studies suggest that primary aromatic amines are major determinants of the observed mutagenic activity. Skin-painting studies with SRC-II naphtha, heavy distillate, shale oil and petroleum crude indicate a good correlation between the results of the cellular assays and skin carcinogenesis in mice. Wash solvent was more toxic after oral administration to rats than was light oil or process solvent. The effects of LO, WS and PS on development were studied after administration to pregnant rats. The tissue distribution of a number of components of PS was studied after oral administration of PS to rats. The effect of SRC-I product on the germination and growth of barley was investigated by mixing or layering the product with soil and placing the mixture in a field lysimeter.

  14. A pilot-scale study on PVA gel beads based integrated fixed film activated sludge (IFAS) plant for municipal wastewater treatment.

    PubMed

    Kumar Singh, Nitin; Singh, Jasdeep; Bhatia, Aakansha; Kazmi, A A

    2016-01-01

    In the present study, a pilot-scale reactor incorporating polyvinyl alcohol gel beads as biomass carrier and operating in biological activated sludge mode (a combination of moving bed biofilm reactor (MBBR) and activated sludge) was investigated for the treatment of actual municipal wastewater. The results, during a monitoring period of 4 months, showed effective removal of chemical oxygen demand (COD), biological oxygen demand (BOD) and NH3-N at optimum conditions with 91%, ∼92% and ∼90% removal efficiencies, respectively. Sludge volume index (SVI) values of activated sludge varied in the range of 25-72 mL/g, indicating appreciable settling characteristics. Furthermore, soluble COD and BOD in the effluent of the pilot plant were reduced to levels well below discharge limits of the Punjab Pollution Control Board, India. A culture dependent method was used to enrich and isolate abundant heterotrophic bacteria in activated sludge. In addition to this, 16S rRNA genes analysis was performed to identify diverse dominant bacterial species in suspended and attached biomass. Results revealed that Escherichia coli, Pseudomonas sp. and Nitrosomonas communis played a significant role in biomass carrier, while Acinetobactor sp. were dominant in activated sludge of the pilot plant. Identification of ciliated protozoa populations rendered six species of ciliates in the plant, among which Vorticella was the most dominant.

  15. A comparative study of the industrial discharges effect on the anaerobic treatment of domestic wastewater in both experimental and pilot-plant scales.

    PubMed

    Saddoud, Ahlem; Abdelkafi, Slim; Aloui, Fathi; Sayadi, Sami

    2010-11-01

    The aim of this study was to compare the effect of industrial discharges on the anaerobic treatment of domestic wastewater in both laboratory and pilot-plant scales at mesophilic conditions. The laboratory experiment results have shown the low process efficiency of anaerobic treatment of DW by the use of an adapted or a non-adapted methanogenic inoculum. These experiments performed in batch digesters were further confirmed by scaling up to a pilot-plant anaerobic membrane bioreactor (MBR). The treatment inefficiency in both laboratory and pilot-plant experiments could be related to the presence of toxic compounds due to the wastewater contamination by industrial discharges. The toxic character of DW was proved by the phytotoxicity and microtoxicity tests. Indeed, the luminescence inhibition percentages started at an average of 21% in the morning and reached more than 84% in the late afternoon. Moreover, the toxicity results have shown a direct relation with methanization results. Indeed, when the average microtoxicity increased to 73%, the average germination index value and the methanization efficiency expressed as the average methane percentage in the produced biogas decreased to 0% and 14.5%, respectively.

  16. Biodegradation of VOCs from printing press air by an on-site pilot plant bioscrubber and laboratory scale continuous yeast cultures.

    PubMed

    Granström, Tom; Lindberg, Pia; Nummela, Jyri; Jokela, Jouni; Leisola, Matti

    2002-01-01

    The volatile organic compound composition (VOCs) of printing press air was found to contain mostly ethanol, but also ethyl acetate, 1-propanol, 2-propanol, 1-methoxy-2-propanol and 3-ethoxy-1-propanol. A pilot plant bioscrubber inoculated with a mixed microbial population was constructed on-site. The bioscrubber was able to treat the polluted gas efficiently. It, however, suffered from strong wall growth and blockages in the column. The efficiencies of the pilot plant and a bioreactor is compared. The yeasts Candida guilliermondii and Saccharomyces cerevisiae known to tolerate ethanol were selected instead of mixed population to avoid the wall growth a nd blockages inthe bioreactor. The removal of the VOCs both individually and as a complex mixture was tested in a microcultivation system and in continuous chemostat cultures with and without cell recycling. The Candida yeast could use all the compounds as a carbon source while growth of S. cerevisiae was markedly slower on the methoxylated and ethoxylated propanols. Best total removal of the VOCs was 99% and achieved by C. guilliermondii. The only compound that was not totally removable in the chemostat experiment with C. guilliermondii was 1-methoxy-2-propanol. In laboratory scale the total and volumetric removal of VOCs by C. guilliermondii was more efficient compared to the pilot plant encouraging to scale up and applying the yeast bioreactor to real field conditions.

  17. Historical Exposures to Chemicals at the Rocky Flats Nuclear Weapons Plant: A Pilot Retrospective Exposure Assessment

    SciTech Connect

    Robertson, Janeen Denise

    1999-02-01

    In a mortality study of white males who had worked at the Rocky Flats Nuclear Weapons Plant between 1952 and 1979, an increased number of deaths from benign and unspecified intracranial neoplasms was found. A case-control study nested within this cohort investigated the hypothesis that an association existed between brain tumor death and exposure to either internally deposited plutonium or external ionizing radiation. There was no statistically significant association found between estimated radiation exposure from internally deposited plutonium and the development of brain tumors. Exposure by job or work area showed no significant difference between the cohort and the control groups. An update of the study found elevated risk estimates for (1) all lymphopoietic neoplasms, and (2) all causes of death in employees with body burdens greater than or equal to two nanocuries of plutonium. There was an excess of brain tumors for the entire cohort. Similar cohort studies conducted on worker populations from other plutonium handling facilities have not yet shown any elevated risks for brain tumors. Historically, the Rocky Flats Nuclear Weapons Plant used large quantities of chemicals in their production operations. The use of solvents, particularly carbon tetrachloride, was unique to Rocky Flats. No investigation of the possible confounding effects of chemical exposures was done in the initial studies. The objectives of the present study are to (1) investigate the history of chemical use at the Rocky Flats facility; (2) locate and analyze chemical monitoring information in order to assess employee exposure to the chemicals that were used in the highest volume; and (3) determine the feasibility of establishing a chemical exposure assessment model that could be used in future epidemiology studies.

  18. Treatment of the Cerro Prieto I brines for use in reinjection. 2. Results of the pilot plant tests

    SciTech Connect

    Hurtado J, R.; Mercado G, S.; Rocha C, E.; Gamino O, H.; Garibaldi P, F.

    1981-01-01

    Silica removal experiments have been carried out both in the laboratory and in pilot scale tests. The results obtained to date are presented, with special emphasis on the pilot tests with or without the use of flocculants. Previous studies on brine treatment are described briefly.

  19. Paducah Gaseous Diffusion Plant proposed pilot pump-and-treat project. Final report

    SciTech Connect

    Bodenstein, G.W.; Bonczek, R.R.; Early, T.O.; Huff, D.D.; Jones, K.S.; Nickelson, M.D.; Rightmire, C.T.

    1994-01-01

    On March 23, 1992, R.C. Sleeman of the Department of Energy, Oak Ridge Operations Office requested that a Groundwater Corrective Actions Team be assembled to evaluate the technical merit of and the need to implement a proposed groundwater pump-and-treat demonstration project for the Northwest contaminant plume at the Paducah Gaseous Diffusion Plant. In addition to other suggestions, the Team recommended that further characterization data be obtained for the plume. In the Fall of 1993 additional, temporary well points were installed so that groundwater samples from the shallow groundwater system and the Regional Gravel Aquifer (RGA) could be obtained to provide a three-dimensional view of groundwater contamination in the region of the plume. The results indicate that pure-phase DNAPL (trichloroethylene [TCE]) probably are present in the source area of the plume and extend in depth to the base of the RGA. Because the DNAPL likely will represent a source of a dissolved phase plume for decades it is essential that source containment take place. The Team recommends that although effective hydraulic containment can be achieved, other alternatives should be considered. For example, recent advances in emplacing low permeability barrier walls to depths of 100 to 150 ft make it possible to consider encirclement of the source of the Northwest plume.

  20. Design and economic benefits from the operation of pulse-jet fabric filter pilot plants

    SciTech Connect

    Emerson, R.D. ); Bustard, C.J.; Holstein, D.B. )

    1992-01-01

    This paper reports that utility power plant flue gas particulate collection is generally accomplished by either electrostatic precipitation (ESP) or fabric filtration (FF). The majority of existing units use ESP's but an increase in the use of FF's occurred during the 1970's and 80's. This was partially due to advances in FF state-of-the-art technology and the tightening of regulatory requirements. Fabric filtration is usually accomplished by reverse gas (RGFF), shake and deflate (SDFF), or pulse jet (PJFF) methods. Regardless of the method, the efficiency and reliability of operation are of paramount importance, especially when six minute averaging (or similar) is required for opacity measurements. Many items enter into the efficiency and reliability of FF's with a primary one being the performance of the fabric itself. The fabric could possibly fail in a given situation and as a minimum would impact outlet emissions, cleaning frequency, and pressure drop. The fabric's performance is very much a function of the flue gas conditions and flyash characteristics.

  1. Report for Treating Hanford LAW and WTP SW Simulants: Pilot Plant Mineralizing Flowsheet

    SciTech Connect

    Arlin Olson

    2012-02-28

    The US Department of Energy is responsible for managing the disposal of radioactive liquid waste in underground storage tanks at the Hanford site in Washington State. The Hanford waste treatment and immobilization plant (WPT) will separate the waste into a small volume of high level waste (HLW), containing most of the radioactive constituents, and a larger volume of low activity waste (LAW), containing most of the non-radioactive chemical and hazardous constituents. The HLW and LAW will be converted into immobilized waste forms for disposal. Currently there is inadequate LAW vitrification capacity planned at the WTP to complete the mission within the required timeframe. Therefore additional LAW capacity is required. One candidate supplemental treatment technology is the fluidized bed steam reformer process (FBSR). This report describes the demonstration testing of the FBSR process using a mineralizing flowsheet for treating simulated Hanford LAW and secondary waste from the WTP (WTP SW). The FBSR testing project produced leach-resistant solid products and environmentally compliant gaseous effluents. The solid products incorporated normally soluble ions into an alkali alumino-silicate (NaS) mineral matrix. Gaseous emissions were found to be within regulatory limits. Cesium and rhenium were captured in the mineralized products with system removal efficiencies of 99.999% and 99.998 respectively. The durability and leach performance of the FBSR granular solid were superior to the low activity reference material (LMR) glass standards. Normalized product consistency test (PCT) release rates for constituents of concern were approximately 2 orders of magnitude less than that of sodium in the Hanford glass [standard].

  2. Resource Conservation and Recovery Act, Part B permit application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 3, Chapter C, Appendix C3 (conclusion)--Chapter C, Appendix C9: Revision 3

    SciTech Connect

    Roggenthen, D. K.; McFeeters, T. L.; Nieweg, R. G.; Blakeslee, J. J.

    1993-03-01

    This volume contains appendices for the following: results of extraction procedure (EP) toxicity data analyses; summary of headspace gas analysis in Rocky Flats Plant sampling program-FY 1988; waste drum gas generation sampling program at Rocky Flats Plant during FY 1988; TRU waste sampling program waste characterization; summary of headspace gas analyses in TRU waste sampling program; summary of volatile organic compounds analyses in TRU waste sampling program; totals analysis versus toxicity characteristic leaching procedure; Waste Isolation Pilot Plant waste characterization sampling and analysis methods; Waste Isolation Pilot Plant waste characterization analytical methods; data reduction, validation and reporting; examples of waste screening checklists; and Waste Isolation Pilot Plant generator/storage site waste screening and acceptance audit program.

  3. Pilot-optimal augmentation synthesis

    NASA Technical Reports Server (NTRS)

    Schmidt, D. K.

    1978-01-01

    An augmentation synthesis method usable in the absence of quantitative handling qualities specifications, and yet explicitly including design objectives based on pilot-rating concepts, is presented. The algorithm involves the unique approach of simultaneously solving for the stability augmentation system (SAS) gains, pilot equalization and pilot rating prediction via optimal control techniques. Simultaneous solution is required in this case since the pilot model (gains, etc.) depends upon the augmented plant dynamics, and the augmentation is obviously not a priori known. Another special feature is the use of the pilot's objective function (from which the pilot model evolves) to design the SAS.

  4. Geochemical evolution of groundwater in the Culebra dolomite near the Waste Isolation Pilot Plant, southeastern New Mexico, USA

    USGS Publications Warehouse

    Siegel, M.D.; Anderholm, S.

    1994-01-01

    The Culebra Dolomite Member of the Rustler Formation, a thin (10 m) fractured dolomite aquifer, lies approximately 450 m above the repository horizon of the Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico, USA. Salinities of water in the Culebra range roughly from 10,000 to 200,000 mg/L within the WIPP site. A proposed model for the post-Pleistocene hydrochemical evolution of the Culebra tentatively identifies the major sources and sinks for many of the groundwater solutes. Reaction-path simulations with the PHRQPITZ code suggest that the Culebra dolomite is a partial chemical equilibrium system whose composition is controlled by an irreversible process (dissolution of evaporites) and equilibrium with gypsum and calcite. Net geochemical reactions along postulated modern flow paths, calculated with the NETPATH code, include dissolution of halite, carbonate and evaporite salts, and ion exchange. R-mode principal component analysis revealed correlations among the concentrations of Si, Mg, pH, Li, and B that are consistent with several clay-water reactions. The results of the geochemical calculations and mineralogical data are consistent with the following hydrochemical model: 1. (1) solutes are added to the Culebra by dissolution of evaporite minerals 2. (2) the solubilities of gypsum and calcite increase as the salinity increases; these minerals dissolve as chemical equilibrium is maintained between them and the groundwater 3. (3) equilibrium is not maintained between the waters and dolomite; sufficient Mg is added to the waters by dissolution of accessory carnallite or polyhalite such that the degree of dolomite supersaturation increases with ionic strength 4. (4) clays within the fractures and rock matrix exert some control on the distribution of Li, B, Mg, and Si via sorption, ion exchange, and dissolution. ?? 1994.

  5. Mineralization of the textile dye acid yellow 42 by solar photoelectro-Fenton in a lab-pilot plant.

    PubMed

    Espinoza, Carolina; Romero, Julio; Villegas, Loreto; Cornejo-Ponce, Lorena; Salazar, Ricardo

    2016-12-05

    A complete mineralization of a textile dye widely used in the Chilean textile industry, acid yellow 42 (AY42), was studied. Degradation was carried out in an aqueous solution containing 100mgL(-1) of total organic carbon (TOC) of dye using the advanced solar photoelectro-Fenton (SPEF) process in a lab-scale pilot plant consisting of a filter press cell, which contains a boron doped diamond electrode and an air diffusion cathode (BDD/air-diffusion cell), coupled with a solar photoreactor for treat 8L of wastewater during 270min of electrolysis. The main results obtained during the degradation of the textile dye were that a complete transformation to CO2 depends directly on the applied current density, the concentration of Fe(2+) used as catalyst, and the solar radiation intensity. The elimination of AY42 and its organic intermediates was due to hydroxyl radicals formed at the anode surface from water oxidation and in the bulk from Fenton's reaction between electrogenerated H2O2 and added Fe(2+). The application of solar radiation in the process (SPEF) yield higher current efficiencies and lower energy consumptions than electro-Fenton (EF) and electro-oxidation with electrogenerated H2O2 (E OH2O2) by the additional production of hydroxyl radicals from the photolysis of Fe(III) hydrated species and the photodecomposition of Fe(III) complexes with organic intermediates. Moreover, some products and intermediates formed during mineralization of dye, such as inorganic ions, carboxylic acids and aromatic compounds were determined by photometric and chromatographic methods. An oxidation pathway is proposed for the complete conversion to CO2.

  6. Establishment of uncertainty ranges and probability distributions of actinide solubilities for performance assessment in the Waste Isolation Pilot Plant (WIPP).

    SciTech Connect

    Long, Jennifer; Nowak, Jim; Ismail, Ahmed E.; Brush, Laurence H.; Xiong, Yongliang

    2010-03-01

    The Fracture-Matrix Transport (FMT) code developed at Sandia National Laboratories solves chemical equilibrium problems using the Pitzer activity coefficient model with a database containing actinide species. The code is capable of predicting actinide solubilities at 25 C in various ionic-strength solutions from dilute groundwaters to high-ionic-strength brines. The code uses oxidation state analogies, i.e., Am(III) is used to predict solubilities of actinides in the +III oxidation state; Th(IV) is used to predict solubilities of actinides in the +IV state; Np(V) is utilized to predict solubilities of actinides in the +V state. This code has been qualified for predicting actinide solubilities for the Waste Isolation Pilot Plant (WIPP) Compliance Certification Application in 1996, and Compliance Re-Certification Applications in 2004 and 2009. We have established revised actinide-solubility uncertainty ranges and probability distributions for Performance Assessment (PA) by comparing actinide solubilities predicted by the FMT code with solubility data in various solutions from the open literature. The literature data used in this study include solubilities in simple solutions (NaCl, NaHCO{sub 3}, Na{sub 2}CO{sub 3}, NaClO{sub 4}, KCl, K{sub 2}CO{sub 3}, etc.), binary mixing solutions (NaCl+NaHCO{sub 3}, NaCl+Na{sub 2}CO{sub 3}, KCl+K{sub 2}CO{sub 3}, etc.), ternary mixing solutions (NaCl+Na{sub 2}CO{sub 3}+KCl, NaHCO{sub 3}+Na{sub 2}CO{sub 3}+NaClO{sub 4}, etc.), and multi-component synthetic brines relevant to the WIPP.

  7. Unresolved issues for the disposal of remote-handled transuranic waste in the Waste Isolation Pilot Plant

    SciTech Connect

    Silva, M.K.; Neill, R.H.

    1994-09-01

    The purpose of the Waste Isolation Pilot Plant (WIPP) is to dispose of 176,000 cubic meters of transuranic (TRU) waste generated by the defense activities of the US Government. The envisioned inventory contains approximately 6 million cubic feet of contact-handled transuranic (CH TRU) waste and 250,000 cubic feet of remote handled transuranic (RH TRU) waste. CH TRU emits less than 0.2 rem/hr at the container surface. Of the 250,000 cubic feet of RH TRU waste, 5% by volume can emit up to 1,000 rem/hr at the container surface. The remainder of RH TRU waste must emit less than 100 rem/hr. These are major unresolved problems with the intended disposal of RH TRU waste in the WIPP. (1) The WIPP design requires the canisters of RH TRU waste to be emplaced in the walls (ribs) of each repository room. Each room will then be filled with drums of CH TRU waste. However, the RH TRU waste will not be available for shipment and disposal until after several rooms have already been filled with drums of CH TRU waste. RH TRU disposal capacity will be loss for each room that is first filled with CH TRU waste. (2) Complete RH TRU waste characterization data will not be available for performance assessment because the facilities needed for waste handling, waste treatment, waste packaging, and waste characterization do not yet exist. (3) The DOE does not have a transportation cask for RH TRU waste certified by the US Nuclear Regulatory Commission (NRC). These issues are discussed along with possible solutions and consequences from these solutions. 46 refs.

  8. Stable, continuous large-scale production of human monoclonal HIV-1 antibody using a computer-controlled pilot plant.

    PubMed

    Unterluggauer, F; Doblhoff-Dier, O; Tauer, C; Jungbauer, A; Gaida, T; Reiter, M; Schmatz, C; Zach, N; Katinger, H

    1994-01-01

    A completely automated pilot plant used for fermentation has been employed with direct digital control (DDC) technology for monitoring and regulating growth of human cells. A human hybridoma cell line (3D6) producing anti-human immunodeficiency virus (HIV)-1 antibodies was used as a model for large-scale production (300-liter airlift fermentor) in continuous culture. Parameters controlled were pH, dissolved oxygen, temperature and the flow rate of four gases used in the process. A control strategy was implemented to achieve constant fluid velocity and mixing by maintaining the rate of gas flow at a constant level. Another advantage of this approach was that the total gas flow required for optimal fluid circulation was reduced from 1 volume gas/volume fermenter/hour (vvh) to 0.3 vvh. Use of a low flow rate eliminated the serious problems of foaming, which contributed significantly to cell destruction, shorter filter-life and other considerations. Dilution rate was optimized at laboratory scale for maximum productivity, which results in relatively low viability. At a dilution rate of 0.0076 h-1, a total cell density of 6-7 x 10(5) cells/ml with a viability of approximately 75% was maintained during long-term continuous cultivation. These growth conditions resulted in a product titer stabilized in the range of 35 micrograms IgG/ml. Batchwise purification was achieved with a recovery of more than 50% and a final purification of active monoclonal antibody representing about 99% product. Results from isoelectric focusing and Western blotting demonstrated batch-to-batch consistency of the purified human monoclonal antibody to HIV-1 during the continuous growth process.(ABSTRACT TRUNCATED AT 250 WORDS)

  9. Interpretation of brine-permeability tests of the Salado Formation at the Waste Isolation Pilot Plant site: First interim report

    SciTech Connect

    Beauheim, R.L. ); Saulnier, G.J. Jr.; Avis, J.D. )

    1991-08-01

    Pressure-pulse tests have been performed in bedded evaporites of the Salado Formation at the Waste Isolation Pilot Plant (WIPP) site to evaluate the hydraulic properties controlling brine flow through the Salado. Hydraulic conductivities ranging from about 10{sup {minus}14} to 10{sup {minus}11} m/s (permeabilities of about 10{sup {minus}21} to 10{sup {minus}18} m{sup 2}) have been interpreted from nine tests conducted on five stratigraphic intervals within eleven meters of the WIPP underground excavations. Tests of a pure halite layer showed no measurable permeability. Pore pressures in the stratigraphic intervals range from about 0.5 to 9.3 MPa. An anhydrite interbed (Marker Bed 139) appears to be one or more orders of magnitude more permeable than the surrounding halite. Hydraulic conductivities appear to increase, and pore pressures decrease, with increasing proximity to the excavations. These effects are particularly evident within two to three meters of the excavations. Two tests indicated the presence of apparent zero-flow boundaries about two to three meters from the boreholes. The other tests revealed no apparent boundaries within the radii of influence of the tests, which were calculated to range from about four to thirty-five meters from the test holes. The data are insufficient to determine if brine flow through evaporites results from Darcy-like flow driven by pressure gradients within naturally interconnected porosity or from shear deformation around excavations connecting previously isolated pores, thereby providing pathways for fluids at or near lithostatic pressure to be driven towards the low-pressure excavations. Future testing will be performed at greater distances from the excavations to evaluate hydraulic properties and processes beyond the range of excavation effects.

  10. Performance assessment requirements for the identification and tracking of transuranic waste intended for disposal at the Waste Isolation Pilot Plant

    SciTech Connect

    Snider, C.A.; Weston, W.W.

    1997-11-01

    To demonstrate compliance with environmental radiation protection standards for management and disposal of transuranic (TRU) radioactive wastes, a performance assessment (PA) of the Waste Isolation Pilot Plant (WIPP) was made of waste-waste and waste-repository interactions and impacts on disposal system performance. An estimate of waste components and accumulated quantities was derived from a roll-up of the generator/storage sites` TRU waste inventories. Waste components of significance, and some of negligible effect, were fixed input parameters in the model. The results identified several waste components that require identification and tracking of quantities to ensure that repository limits are not exceeded. The rationale used to establish waste component limits based on input estimates is discussed. The distinction between repository limits and waste container limits is explained. Controls used to ensure that no limits are exceeded are identified. For waste components with no explicit repository based limits, other applicable limits are contained in the WIPP Waste Acceptance Criteria (WAC). The 10 radionuclides targeted for identification and tracking on either a waste container or a waste stream basis include Am-241, Pu-238, Pu-239, Pu-240, Pu-242, U-233, U-234, U-238, Sr-90, and Cs-137. The accumulative activities of these radionuclides are to be inventoried at the time of emplacement in the WIPP. Changes in inventory curie content as a function of radionuclide decay and ingrowth over time will be calculated and tracked. Due to the large margin of compliance demonstrated by PA with the 10,000 year release limits specified, the quality assurance objective for radioassay of the 10 radionuclides need to be no more restrictive than those already identified for addressing the requirements imposed by transportation and WIPP disposal operations in Section 9 of the TRU Waste Characterization Quality Assurance Program Plan. 6 refs.

  11. Key regulatory drivers affecting shipments of mixed transuranic waste from Los Alamos National Laboratory to the Waste Isolation Pilot Plant

    SciTech Connect

    Schumann, P.B.; Bacigalupa, G.A.; Kosiewicz, S.T.; Sinkule, B.J.

    1997-02-01

    A number of key regulatory drivers affect the nature, scope, and timing of Los Alamos National Laboratory`s (LANL`s) plans for mixed transuranic (MTRU) waste shipments to the Waste Isolation Pilot Plant (WIPP), which are planned to commence as soon as possible following WIPP`s currently anticipated November, 1997 opening date. This paper provides an overview of some of the key drivers at LANL, particularly emphasizing those associated with the hazardous waste component of LANL`s MTRU waste (MTRU, like any mixed waste, contains both a radioactive and a hazardous waste component). The key drivers discussed here derive from the federal Resource Conservation and Recovery Act (RCRA) and its amendments, including the Federal Facility Compliance Act (FFCAU), and from the New Mexico Hazardous Waste Act (NMHWA). These statutory provisions are enforced through three major mechanisms: facility RCRA permits; the New Mexico Hazardous Waste Management Regulations, set forth in the New Mexico Administrative Code, Title 20, Chapter 4, Part 1: and compliance orders issued to enforce these requirements. General requirements in all three categories will apply to MTRU waste management and characterization activities at both WIPP and LANL. In addition, LANL is subject to facility-specific requirements in its RCRA hazardous waste facility permit, permit conditions as currently proposed in RCRA Part B permit applications presently being reviewed by the New Mexico Environment Department (NNED), and facility-specific compliance orders related to MTRU waste management. Likewise, permitting and compliance-related requirements specific to WIPP indirectly affect LANL`s characterization, packaging, record-keeping, and transportation requirements for MTRU waste. LANL must comply with this evolving set of regulatory requirements to begin shipments of MTRU waste to WIPP in a timely fashion.

  12. BI-GAS pilot plant. Quarterly technical progress report, 1 January 1981-31 March 1981

    SciTech Connect

    Not Available

    1981-01-01

    Test G-16 was conducted on January 20 to 24, 1981, with 58.2 hr of coal feed, 60.5 hr of char feed, and 69.7 hr of char burner firing. During the fuel gas reduction test, it was observed that the plant pressures and temperatures were slightly less steady than during operation with excess fuel gas. The gasifier pressure oscillated plus or minus five psi compared to a normal fluctuation of plus or minus two psi; while the Stage I temperature varied plus or minus 50/sup 0/F compared to plus or minus 20/sup 0/F. Fuel gas was returned to normal flow due to problems with gas washer control and instabilities in char feed. Slag removal from the gasifier was much better during Test G-16 (90%) due to use of the slag breaker, slag agitator, and installation of the grating over both lockhopper legs. Favorable results were obtained during the first test using flocculant addition to the coal fines stream feeding the centrifuge, to aid in solids removal. Installation of the vortex breaker and the drilling of the holes in the lower baffle, to prevent interference with the level control instrumentation, did not improve operation of the gas washer. Test G-16A was conducted on February 23 to March 1, 1981, with 122.0 hr of coal feed, 120.2 hr of char feed, and 133.2 hr of char burner firing. The gasifier was able to be operated stably at an oxygen to fuel gas ratio of two to one in Stage I for a 24-hr period. Testing of the Aurburn flow monitor indicated that this instrument was able to give immediate and consistent responses to changes in char feed valve setting. It will be necessary to make some revisions in the sensor, however, before the monitor can be used to determine flow rate. The modified Kamyr valve successfully controlled char feed through the B leg, with good control occurring between twenty to sixty percent valve position.

  13. The effects of regional insolation differences upon advanced solar thermal electric power plant performance and energy costs

    NASA Technical Reports Server (NTRS)

    Latta, A. F.; Bowyer, J. M.; Fujita, T.

    1979-01-01

    This paper presents the performance and cost of four 10-MWe advanced solar thermal electric power plants sited in various regions of the continental United States. Each region has different insolation characteristics which result in varying collector field areas, plant performance, capital costs, and energy costs. The paraboloidal dish, central receiver, cylindrical parabolic trough, and compound parabolic concentrator (CPC) comprise the advanced concepts studied. This paper contains a discussion of the regional insolation data base, a description of the solar systems' performances and costs, and a presentation of a range for the forecast cost of conventional electricity by region and nationally over the next several decades.

  14. SUMMARY CONCLUSIONS FOR THE PILOT IN-SITU CHROMIUM REDUCTION TEST AT RIVERBANK ARMY AMMUNITIONS PLANT

    SciTech Connect

    Ridley, M

    2007-04-25

    A treatability study was conducted at Riverbank Army Ammunition Plant's (RBAAP) Site 17, to evaluate the effectiveness of a permeable reactive barrier (PRB) for the treatment of hexavalent chromium (Cr{sup 6+}). The chromium contamination at Site 17 is hydrologically isolated and unsuitable for standard extraction and treatment (pump and treat). The majority of the chromium contamination at Site 17 is trapped within the fine grain sediments of a clay/slit zone (45 to 63). The PRB was established above and adjacent to the contaminated zone at Site 17 to reduce the hexavalent chromium as it leaches out of the contaminated clay/silt zone separating the A zone from the A zone. Site 17 and the monitoring network are described in the In-Situ Chromium Reduction Treatability Study Work Plan (CH2MHILL, January 2004). The PRB was created by reducing naturally occurring Fe{sup 3+} to Fe{sup 2+} with the injection of a buffered sodium dithionite solution into subsurface chromium source area. The Cr{sup 6+} leaching out of the contaminated clay/silt zone and migrating through the PRB is reduced by Fe{sup 2+} to Cr{sup 3+} and immobilized (Amonette, et al., 1994). The sodium dithionite will also reduce accessible Cr{sup 6+}, however the long-term reductant is the Fe{sup 2+}. Bench scale tests (Appendix A) were conducted to assess the quantity and availability of the naturally occurring iron at Site 17, the ability of the sodium dithionite to reduce the hexavalent chromium and Fe within the sediments, and the by-products produced during the treatment. Appendix A, provides a detailed description of the laboratory treatability tests, and provides background information on the technologies considered as possible treatment options for Site 17. Following the sodium dithionite treatment, groundwater/treatment solution was extracted to remove treatment by-products (sulfate, manganese, and iron). The following sections briefly discuss the current treatment status, future recommendations

  15. Comparison of EDCs removal in full and pilot scale membrane bioreactor plants: Effect of flux rate on EDCs removal in short SRT.

    PubMed

    Komesli, O T; Muz, M; Ak, M S; Bakırdere, S; Gökçay, C F

    2016-06-17

    Currently, it is estimated that over 1 billion people are short of adequate portable water and this is expected to increase to 2.5 billion in the year 2025. Membrane Bioreactors (MBR) are now accepted as important tools to extend the availability of water by facilitating the reuse of wastewaters. Sludge Retention Time (SRT) and liquid flux rate are the two most important parameters for controlling the MBR process. In this study, the removal of selected endocrine disrupter compounds (EDCs), diltiazem, progesterone, estrone (E1), carbamazepine (Cbz) and acetaminophen (Acet), by one full scale (VRM) and one pilot scale (clear-box) MBR plants was investigated. During the study, sludge age was set at 10 days and the sludge concentration was fixed at about 5.0 g/L. The transmembrane pressure (TMP) got higher with either increasing flux or sludge concentration in the membrane chamber. Therefore, changing the flux from 13 to 30 L/m(2)-h in both plants caused enhancement in TMP from -25 to -300 mbar in the clear-box and from -160 to over -350 in the full scale MBRs. It was understood that flux had very little effect on the removal of EDCs at very low concentrations. Moreover, diltiazem was completely removed in the full scale whereas no removal was achieved in the pilot scale. Estrone and progesterone were completely removed by biodegradation in both plants. Acetaminophen was completely removed in the full scale plant whereas over 95% removal was achieved in the pilot scale MBR.

  16. Arapahoe low-sulfur-coal fabric filter pilot plant: Volume 3, Characterization of sonic-assisted reverse-gas cleaning, May 1982--May 1984: Final report

    SciTech Connect

    Cushing, K.M.; Bustard, C.J.; Pontius, D.H.; Pyle, B.E.; Smith, W.B.

    1989-02-01

    During 1981 intense interest developed in the utility industry regarding the use of horns as a supplement to reverse-gas bag cleaning. To characterize and assess sonic-enhanced, reverse-gas cleaning, horns were installed at EPRI's 10-MW Fabric Filter Pilot Plant (FFPP) at its Arapahoe Test Facility located at Public Service Company of Colorado's Arapahoe Steam Plant in Denver, Colorado. In addition to the FFPP tests, laboratory studies of sonic cleaning were conducted to supplement the pilot plant data. To verify the applicability of the pilot plant and laboratory work to full-scale baghouses, field data from utility baghouses in which horns had been installed were collected. The purpose of the testing was to determine the range of horn frequencies and total output power most effective in removing residual dustcakes from bags in reverse-gas-cleaned baghouses and, hence, most effective in reducing baghouse pressure drop. No attempt was made to identify a specific horn or horns most appropriate for baghouse application. The report presents the results of this testing from May 1982 through May 1984. Results showed that horns can dislodge a significant fraction of residual dustcake, thereby reducing pressure drop by as much as 60% without any noticeable reduction in bag life. Although outlet particulate emissions are higher with sonic assistance, they are generally <0.01 lb/10/sup 6/ Btu---below the 1979 New Source Performance Standards of 0.03 lb/MBtu. The overall results of this sonic horn investigation indicate that reverse-gas cleaning with sonic assistance definitely promotes more effective bag filter cleaning and lower pressure drop, and it should be considered as a supplement for most reverse-gas cleaned baghouse applications. 10 refs., 37 figs., 7 tabs.

  17. Resource Conservation and Recovery Act, Part B permit application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 4, Revision 1.0

    SciTech Connect

    Not Available

    1991-12-31

    The US Department of Energy is currently constructing the Waste Isolation Pilot near Carlsbad, New Mexico. The full-scale pilot plant will demonstrate the feasibility of the safe disposal of defense-related nuclear waste in a bedded salt formation at a depth of 2160 feet below the surface. WIPP will provide for the permanent storage of 25,000 cu ft of remote-handled (RH) transuranic waste and 6,000,000 cu ft of contact-handled (CH) transuranic waste. This paper covers the major mechanical/structural design considerations for the waste hoist and its hoist tower structure. The design of the hoist system and safety features incorporates state-of-the-art technology developed in the hoist and mining industry to ensure safe operation for transporting nuclear waste underground. Also included are design specifications for VOC-10 monitoring system.

  18. Volatile, anthocyanidin, quality and sensory changes in rabbiteye blueberry from whole fruit through pilot plant juice processing.

    Technology Transfer Automated Retrieval System (TEKTRAN)

    BACKGROUND: High antioxidant content and keen marketing have increased blueberry demand and increased local production which in turn mandates new uses for abundant harvests. Pilot scale processes were employed to investigate the anthocyanidin profiles, qualitative volatile compositions, and sensori...

  19. Projected techno-economic improvements for advanced solar thermal power plants

    NASA Technical Reports Server (NTRS)

    Fujita, T.; Manvi, R.; Roschke, E. J.

    1979-01-01

    The projected characteristics of solar thermal power plants (with outputs up to 10 MWe) employing promising advanced technology subsystems/components are compared to current (or pre-1985) steam-Rankine systems. Improvements accruing to advanced technology development options are delineated. The improvements derived from advanced systems result primarily from achieving high efficiencies via solar collector systems which (1) capture a large portion of the available insolation and (2) concentrate this captured solar flux to attain high temperatures required for high heat engine/energy conversion performance. The most efficient solar collector systems employ two-axis tracking. Attractive systems include the central receiver/heliostat and the parabolic dish.

  20. The application of simulation modeling to the cost and performance ranking of solar thermal power plants

    NASA Technical Reports Server (NTRS)

    Rosenberg, L. S.; Revere, W. R.; Selcuk, M. K.

    1981-01-01

    Small solar thermal power systems (up to 10 MWe in size) were tested. The solar thermal power plant ranking study was performed to aid in experiment activity and support decisions for the selection of the most appropriate technological approach. The cost and performance were determined for insolation conditions by utilizing the Solar Energy Simulation computer code (SESII). This model optimizes the size of the collector field and energy storage subsystem for given engine generator and energy transport characteristics. The development of the simulation tool, its operation, and the results achieved from the analysis are discussed.