Science.gov

Sample records for 10-year implementation plan

  1. 78 FR 47259 - Approval and Promulgation of Implementation Plans; Washington: Thurston County Second 10-Year PM10

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-05

    ... Washington State Department of Ecology (Ecology) regulatory changes that strengthen the control measures... Standard (NAAQS) on August 7, 1987 (52 FR 29383). Ecology and ORCAA worked with the communities of Lacey... requirements imposed by the 1990 CAA Amendments, Ecology submitted a supplement to the attainment plan...

  2. Operations, Maintenance, and Replacement 10-Year Plan, 1990 -1999.

    SciTech Connect

    United States. Bonneville Power Administration.

    1990-08-01

    In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the late summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-Year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

  3. Operations, Maintenance, and Replacement 10-Year Plan, 1990--1999

    SciTech Connect

    Not Available

    1990-08-01

    In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the later summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

  4. Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-05-01

    Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM&R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA`s power system. This document -- the 1992 OM&R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction`s critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA`s ability to accomplish its OM&R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

  5. Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-05-01

    Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA's power system. This document -- the 1992 OM R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction's critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA's ability to accomplish its OM R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

  6. 1992 Resource Program, 10 Year Plan : Draft II.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-05-01

    The Resource Program is the Bonneville Power Administration's primary process for deciding how to meet future electricity resource needs, how much new resources to develop, which types of resources to acquire or option and how to go about acquiring them, and how much BPA will have to spend for these resources. Recognizing that BPA must make a long-term commitment to acquiring conservation effectively, the 1992 Resource Program outlines a 10-year plan. Draft 2 of the 1992 Resource Program provides a framework for discussing the funding levels proposed in the Programs in Perspective (PIP) process. Previous final resource programs have been released prior to the PIP process. This version of the Resource Program recognizes that the PIP discussions are an integral part of the resource decision-making process and, therefore, it will be finalized after PIP.

  7. 1992 Resource Program, 10 Year Plan : Draft II.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-05-01

    The Resource Program is the Bonneville Power Administration`s primary process for deciding how to meet future electricity resource needs, how much new resources to develop, which types of resources to acquire or option and how to go about acquiring them, and how much BPA will have to spend for these resources. Recognizing that BPA must make a long-term commitment to acquiring conservation effectively, the 1992 Resource Program outlines a 10-year plan. Draft 2 of the 1992 Resource Program provides a framework for discussing the funding levels proposed in the Programs in Perspective (PIP) process. Previous final resource programs have been released prior to the PIP process. This version of the Resource Program recognizes that the PIP discussions are an integral part of the resource decision-making process and, therefore, it will be finalized after PIP.

  8. 24 CFR 203.203 - Issuance and nature of insured 10-year protection plans.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Issuance and nature of insured 10-year protection plans. 203.203 Section 203.203 Housing and Urban Development Regulations Relating to... Underwriting Procedures Insured Ten-Year Protection Plans (plan) § 203.203 Issuance and nature of insured...

  9. 24 CFR 203.203 - Issuance and nature of insured 10-year protection plans.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 2 2011-04-01 2011-04-01 false Issuance and nature of insured 10-year protection plans. 203.203 Section 203.203 Housing and Urban Development Regulations Relating to... Underwriting Procedures Insured Ten-Year Protection Plans (plan) § 203.203 Issuance and nature of insured...

  10. 24 CFR 203.203 - Issuance and nature of insured 10-year protection plans.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 2 2013-04-01 2013-04-01 false Issuance and nature of insured 10-year protection plans. 203.203 Section 203.203 Housing and Urban Development Regulations Relating to... Underwriting Procedures Insured Ten-Year Protection Plans (plan) § 203.203 Issuance and nature of insured...

  11. 24 CFR 203.203 - Issuance and nature of insured 10-year protection plans.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 2 2012-04-01 2012-04-01 false Issuance and nature of insured 10-year protection plans. 203.203 Section 203.203 Housing and Urban Development Regulations Relating to... Underwriting Procedures Insured Ten-Year Protection Plans (plan) § 203.203 Issuance and nature of insured...

  12. 24 CFR 203.203 - Issuance and nature of insured 10-year protection plans.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 2 2014-04-01 2014-04-01 false Issuance and nature of insured 10-year protection plans. 203.203 Section 203.203 Housing and Urban Development Regulations Relating to... Underwriting Procedures Insured Ten-Year Protection Plans (plan) § 203.203 Issuance and nature of insured...

  13. Anticipatory Action Planning Increases from 3 to 10 Years of Age in Typically Developing Children

    ERIC Educational Resources Information Center

    Jongbloed-Pereboom, Marjolein; Nijhuis-van der Sanden, Maria W. G.; Saraber-Schiphorst, Nicole; Craje, Celine; Steenbergen, Bert

    2013-01-01

    The primary aim of this study was to assess the development of action planning in a group of typically developing children aged 3 to 10 years (N = 351). The second aim was to assess reliability of the action planning task and to relate the results of the action planning task to results of validated upper limb motor performance tests. Participants…

  14. 7 CFR Exhibit L to Subpart A of... - Insured 10-Year Home Warranty Plan Requirements

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 12 2014-01-01 2013-01-01 true Insured 10-Year Home Warranty Plan Requirements L Exhibit L to Subpart A of Part 1924 Agriculture Regulations of the Department of Agriculture (Continued... Construction and Other Development Pt. 1924, Subpt. A, Exh. L Exhibit L to Subpart A of Part 1924—Insured...

  15. 7 CFR Exhibit L to Subpart A of... - Insured 10-Year Home Warranty Plan Requirements

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 12 2013-01-01 2013-01-01 false Insured 10-Year Home Warranty Plan Requirements L Exhibit L to Subpart A of Part 1924 Agriculture Regulations of the Department of Agriculture (Continued... Construction and Other Development Pt. 1924, Subpt. A, Exh. L Exhibit L to Subpart A of Part 1924—Insured...

  16. 7 CFR Exhibit L to Subpart A of... - Insured 10-Year Home Warranty Plan Requirements

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 12 2011-01-01 2011-01-01 false Insured 10-Year Home Warranty Plan Requirements L Exhibit L to Subpart A of Part 1924 Agriculture Regulations of the Department of Agriculture (Continued... Construction and Other Development Pt. 1924, Subpt. A, Exh. L Exhibit L to Subpart A of Part 1924—Insured...

  17. 7 CFR Exhibit L to Subpart A of... - Insured 10-Year Home Warranty Plan Requirements

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 12 2012-01-01 2012-01-01 false Insured 10-Year Home Warranty Plan Requirements L Exhibit L to Subpart A of Part 1924 Agriculture Regulations of the Department of Agriculture (Continued... Construction and Other Development Pt. 1924, Subpt. A, Exh. L Exhibit L to Subpart A of Part 1924—Insured...

  18. Effects of Multiple Planning Constraints on the Development of Grasp Posture Planning in 6- to 10-Year-Old Children

    ERIC Educational Resources Information Center

    Stöckel, Tino; Hughes, Charmayne M. L.

    2015-01-01

    This experiment examined how multiple planning constraints affect grasp posture planning in 6- to 10-year-old children (n = 16 in each group) by manipulating the intended object end-orientation (left end-down, right end-down) and initial precision demands (standard, initial precision) of a bar transport task. Results indicated that grasp posture…

  19. The Effects of Lack of Joint Goal Planning on Divorce over 10 Years

    PubMed Central

    Gere, Judith; Almeida, David M.; Martire, Lynn M.

    2016-01-01

    Given the negative consequences of divorce on health and well-being, it is important to try to identify its predictors. In the current study we used data from the National Survey of Midlife Development (N = 2801) to examine the longitudinal effects of lack of joint goal planning with a romantic relationship partner on divorce over a 10-year period. Multilevel regression analyses showed that lack of joint planning with the relationship partner was associated with a 19% increase in the odds of divorce, even when controlling for various demographic (i.e., age, gender, relationship length, number of children in the household), individual (i.e., neuroticism, positive affect, negative affect, physical symptoms, planning), and relationship (i.e., marital empathy, partner strain, partner disagreement, marital satisfaction, commitment). These results demonstrate the importance of considering one’s partner when making decisions and plans for the future, given that it has clear implications for relationship dissolution. PMID:27668863

  20. The Effects of Lack of Joint Goal Planning on Divorce over 10 Years.

    PubMed

    Gere, Judith; Almeida, David M; Martire, Lynn M

    Given the negative consequences of divorce on health and well-being, it is important to try to identify its predictors. In the current study we used data from the National Survey of Midlife Development (N = 2801) to examine the longitudinal effects of lack of joint goal planning with a romantic relationship partner on divorce over a 10-year period. Multilevel regression analyses showed that lack of joint planning with the relationship partner was associated with a 19% increase in the odds of divorce, even when controlling for various demographic (i.e., age, gender, relationship length, number of children in the household), individual (i.e., neuroticism, positive affect, negative affect, physical symptoms, planning), and relationship (i.e., marital empathy, partner strain, partner disagreement, marital satisfaction, commitment). These results demonstrate the importance of considering one's partner when making decisions and plans for the future, given that it has clear implications for relationship dissolution.

  1. Energy-water analysis of the 10-year WECC transmission planning study cases.

    SciTech Connect

    Tidwell, Vincent Carroll; Passell, Howard David; Castillo, Cesar; Moreland, Barbara

    2011-11-01

    calculating water withdrawal and consumption for current and planned electric power generation; projected water demand from competing use sectors; and, surface and groundwater availability. WECC's long range planning is organized according to two target planning horizons, a 10-year and a 20-year. This study supports WECC in the 10-year planning endeavor. In this case the water implications associated with four of WECC's alternative future study cases (described below) are calculated and reported. In future phases of planning we will work with WECC to craft study cases that aim to reduce the thermoelectric footprint of the interconnection and/or limit production in the most water stressed regions of the West.

  2. A 10-year plan to study the aquifer system of Indian Wells Valley, California

    USGS Publications Warehouse

    Lipinski, Paul; Knochenmus, Darwin D.

    1981-01-01

    Water needs of the population of Indian Wells Valley, Calif., must be met through further development of ground-water resources. Studies show that annual ground-water pumpage there has increased since 1945 and has exceeded mean annual recharge since 1966. Continued and increased stress on the aquifer system of the valley is expected because population in the valley is predicted to double by 1998 and triple by 2020, based on 1977 population figures. The U.S. Geological Survey proposes a 10-year program to develop a data base to aid in evaluation of future water-management alternatives. A study plan has been developed that describes present and potential problems and objectives of the program, and outlines work items to be undertaken in the study area. (USGS)

  3. Bonneville Power Administration, Office of Engineering 10-Year Plan, 1992-2001 : Draft.

    SciTech Connect

    United States. Bonneville Power Administration. Office of Engineering.

    1992-05-01

    For over 50 years, the Bonneville Power Administration (BPA) has evolved to supply electric power to more than 170 customer utilities and direct service industries across 14,800 miles of high voltage transmission lines. BPA`s Office of Engineering provides the planning, development, and engineering for the required expansion, upgrade, and replacement of the transmission system. The purpose of this 10-Year Plan is to present strategies to maintain a reliable energy delivery system within changing public, business, technological, and environmental climates. The issues and trends discussed in this document and our strategies for addressing them provide the background for the Office of Engineering programs and projects. With a budget in the hundreds of millions annually and increasing public concern, we welcome the opportunity to communicate with our customers. In addition to the factors, trends and issues described in this document are two appendices containing project costs and program and staffing levels. These figures are preliminary with estimates current as of May 13, 1992.

  4. Bonneville Power Administration, Office of Engineering 10-Year Plan, 1992-2001 : Draft.

    SciTech Connect

    United States. Bonneville Power Administration. Office of Engineering.

    1992-05-01

    For over 50 years, the Bonneville Power Administration (BPA) has evolved to supply electric power to more than 170 customer utilities and direct service industries across 14,800 miles of high voltage transmission lines. BPA's Office of Engineering provides the planning, development, and engineering for the required expansion, upgrade, and replacement of the transmission system. The purpose of this 10-Year Plan is to present strategies to maintain a reliable energy delivery system within changing public, business, technological, and environmental climates. The issues and trends discussed in this document and our strategies for addressing them provide the background for the Office of Engineering programs and projects. With a budget in the hundreds of millions annually and increasing public concern, we welcome the opportunity to communicate with our customers. In addition to the factors, trends and issues described in this document are two appendices containing project costs and program and staffing levels. These figures are preliminary with estimates current as of May 13, 1992.

  5. Operations, Maintenance, and Replacement 10-Year Plan 1990-1999 : Environmental Strategy. Final Report.

    SciTech Connect

    United States. Bonneville Power Administration.

    1990-09-01

    In operating and maintaining its regional power transmission system, Bonneville Power Administration (BPA) must address environmental concerns. Pollution sources and pathways for pollution migration, including potential contamination from hazardous or toxic materials, are present. BPA must develop and follow precautionary measures, respond to emergencies, minimize wastes, redress past problems, alert and train employees to problems and safety needs, constantly evaluate this effort and update the program for improvements and changes in regulations and technology. Part of BPA's mission is to conduct its operation, maintenance, and replacement programs in an environmentally sound manner. BPA recognizes its responsibility to be good stewards of the environment. BPA will meet its environmental obligations as set forth in environmental laws and regulations. BPA intends to make consistent and measurable progress toward meeting these responsibilities. The target for the 10-Year Plan is to achieve environmental compliance and meet the following goals: (1) protect human health and the environment; (2) avoid or limit liability (3) set up an effective internal management structure to maintain compliance; and (4) achieve cost-effective compliance. 6 figs.

  6. Effects of multiple planning constraints on the development of grasp posture planning in 6- to 10-year-old children.

    PubMed

    Stöckel, Tino; Hughes, Charmayne M L

    2015-09-01

    This experiment examined how multiple planning constraints affect grasp posture planning in 6- to 10-year-old children (n = 16 in each group) by manipulating the intended object end-orientation (left end-down, right end-down) and initial precision demands (standard, initial precision) of a bar transport task. Results indicated that grasp posture planning was strongly influenced by multiple planning constraints. During the standard condition the sensitivity toward comfortable final hand postures (end-state comfort) was similar for all age groups in right end-down trials, and corresponded to values reported in adult populations. In contrast, there was an age-related increase in end-state comfort compliance during left end-down trials. During the initial precision condition end-state comfort was similar across all groups for left end-down trials. However, end-state comfort compliance was significantly lower for the 6-year-old children than in all other age groups for right end-down trials. In sum, the ability of children to plan their goal-related movements is influenced by the presence of task-related constraints that increase the overall cognitive demands of the task. The demands associated with selecting the appropriate grasp posture during the most cognitive demanding condition required more cognitive resources than 6- to 10-year-old children possess. Removing the conflict between the goal-directed and habitual systems reduces some of these costs, with data indicating that the ability to integrate multiple planning constraints first emerges at 7 years of age, and improves over the developmental spectrum.

  7. Haiti's progress in achieving its 10-year plan to eliminate cholera: hidden sickness cannot be cured.

    PubMed

    Koski-Karell, Victoria; Farmer, Paul E; Isaac, Benito; Campa, Elizabeth M; Viaud, Loune; Namphy, Paul C; Ternier, Ralph; Ivers, Louise C

    2016-01-01

    Since the beginning of the cholera epidemic in Haiti 5 years ago, the prevalence of this deadly water-borne disease has fallen far below the initial rates registered during its explosive outset. However, cholera continues to cause extensive suffering and needless deaths across the country, particularly among the poor. The urgent need to eliminate transmission of cholera persists: compared to the same period in 2014, the first 4 months of 2015 saw three times the number of cholera cases. Drawing upon epidemiology, clinical work (and clinical knowledge), policy, ecology, and political economy, and informed by ethnographic data collected in a rural area of Haiti called Bocozel, this paper evaluates the progress of the nation's 10-year Plan for the Elimination of Cholera. Bocozel is a rice-producing region where most people live in extreme poverty. The irrigation network is decrepit, the land is prone to environmental shocks, fertilizer is not affordable, and the government's capacity to assist farmers is undermined by resource constraints. When peasants do have rice to sell, the price of domestically grown rice is twice that of US-imported rice. Canal water is not only used to irrigate thousands of acres of rice paddies and sustain livestock, but also to bathe, wash, and play, while water from wells, hand pumps, and the river is used for drinking, cooking, and bathing. Only one out of the three government-sponsored water treatment stations in the research area is still functional and utilized by those who can afford it. Latrines are scarce and often shared by up to 30 people; open defecation remains common. Structural vulnerabilities cut across all sectors - not just water, sanitation, health care, and education, but agriculture, environment, (global and local) commerce, transportation, and governance as well. These are among the hidden sicknesses that impede Haiti and its partners' capacity to eliminate cholera.

  8. If We Could Plan the Next 10 Years in Science Education...

    ERIC Educational Resources Information Center

    Mansell, Warwick

    2013-01-01

    Two major sessions at the 2013 ASE Summer Celebration Conference in Hatfield offered teachers (and other educators) the chance to debate and define the key issues facing science education over the next 10 years. Participants were asked to suggest the important issues. Then those with similar proposals were put into groups to develop the idea ready…

  9. [The national plan for orphan rare diseases: nearly 10 years on].

    PubMed

    Guillevin, L

    2013-02-01

    The management of orphan rare diseases has been the goal of two successive government plans since 2004. They allowed the management of these diseases to be handled initially through reference centers, then by specialized centers that were specifically created. The resulting benefits to patients, standardization of management protocols, dissemination of information through ORPHANET, and the development of both fundamental and clinical research have clearly justified the setting up of these plans. Other associated plans are expected to follow in the years to come.

  10. A 10-year Plan for Quality Living for People with Disabilities and Their Carers

    ERIC Educational Resources Information Center

    Craig, Jocelyn E.; Cartwright, Collen

    2015-01-01

    Background: The concerns of older carers of an adult with disabilities have been well documented. The sudden incapacity or death of the carer can result in a crisis response rather than a planned transition to a chosen sustainable alternative care arrangement for the person with disability. Building on previous "Futures Planning"…

  11. Environmental protection Implementation Plan

    SciTech Connect

    R. C. Holland

    1999-12-01

    This ``Environmental Protection Implementation Plan'' is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California's commitment to conduct its operations in an environmentally safe and responsible manner. The ``Environmental Protection Implementation Plan'' helps management and staff comply with applicable environmental responsibilities.

  12. Strategic implementation plan

    NASA Technical Reports Server (NTRS)

    1989-01-01

    The Life Science Division of the NASA Office of Space Science and Applications (OSSA) describes its plans for assuring the health, safety, and productivity of astronauts in space, and its plans for acquiring further fundamental scientific knowledge concerning space life sciences. This strategic implementation plan details OSSA's goals, objectives, and planned initiatives. The following areas of interest are identified: operational medicine; biomedical research; space biology; exobiology; biospheric research; controlled ecological life support; flight programs and advance technology development; the life sciences educational program; and earth benefits from space life sciences.

  13. Environmental Implementation Plan

    SciTech Connect

    Not Available

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.

  14. Environmental Implementation Plan

    SciTech Connect

    Not Available

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

  15. Improving diversity through strategic planning: a 10-year (2002-2012) experience at theMedical University of South Carolina.

    PubMed

    Deas, Deborah; Pisano, Etta D; Mainous, Arch G; Johnson, Natalie G; Singleton, Myra Haney; Gordon, Leonie; Taylor, Wanda; Hazen-Martin, Debra; Burnham, Willette S; Reves, J G

    2012-11-01

    The Medical University of South Carolina launched a systematic plan to infuse diversity among its students, resident physicians, and faculty in 2002. The dean and stakeholders of the College of Medicine (COM) embraced the concept that a more population-representative physician workforce could contribute to the goals of providing quality medical education and addressing health care disparities in South Carolina. Diversity became a central component of the COM's strategic plan, and all departments developed diversity plans consistent with the overarching plan of the COM. Liaisons from the COM diversity committee facilitated the development of the department's diversity plans. By 2011, the efforts resulted in a doubling of the number of underrepresented-in-medicine (URM, defined as African American, Latino, Native American) students (21% of student body); matriculation of 10 African American males as first-year medical students annually for four consecutive years; more than a threefold increase in URM residents/fellows; expansion of pipeline programs; expansion of mentoring programs; almost twice as many URM faculty; integration of cultural competency throughout the medical school curriculum; advancement of women and URM individuals into leadership positions; and enhanced learning for individuals from all backgrounds. This article reports the implementation of an institutional plan to create a more racially representative workforce across the academic continuum. The authors emphasize the role of the stakeholders in promoting diversity, the value of annual assessment to evaluate outcomes, and the positive benefits for individuals of all backgrounds.

  16. Environmental Implementation Plan

    SciTech Connect

    Not Available

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

  17. Haiti’s progress in achieving its 10-year plan to eliminate cholera: hidden sickness cannot be cured

    PubMed Central

    Koski-Karell, Victoria; Farmer, Paul E; Isaac, Benito; Campa, Elizabeth M; Viaud, Loune; Namphy, Paul C; Ternier, Ralph; Ivers, Louise C

    2016-01-01

    Since the beginning of the cholera epidemic in Haiti 5 years ago, the prevalence of this deadly water-borne disease has fallen far below the initial rates registered during its explosive outset. However, cholera continues to cause extensive suffering and needless deaths across the country, particularly among the poor. The urgent need to eliminate transmission of cholera persists: compared to the same period in 2014, the first 4 months of 2015 saw three times the number of cholera cases. Drawing upon epidemiology, clinical work (and clinical knowledge), policy, ecology, and political economy, and informed by ethnographic data collected in a rural area of Haiti called Bocozel, this paper evaluates the progress of the nation’s 10-year Plan for the Elimination of Cholera. Bocozel is a rice-producing region where most people live in extreme poverty. The irrigation network is decrepit, the land is prone to environmental shocks, fertilizer is not affordable, and the government’s capacity to assist farmers is undermined by resource constraints. When peasants do have rice to sell, the price of domestically grown rice is twice that of US-imported rice. Canal water is not only used to irrigate thousands of acres of rice paddies and sustain livestock, but also to bathe, wash, and play, while water from wells, hand pumps, and the river is used for drinking, cooking, and bathing. Only one out of the three government-sponsored water treatment stations in the research area is still functional and utilized by those who can afford it. Latrines are scarce and often shared by up to 30 people; open defecation remains common. Structural vulnerabilities cut across all sectors – not just water, sanitation, health care, and education, but agriculture, environment, (global and local) commerce, transportation, and governance as well. These are among the hidden sicknesses that impede Haiti and its partners’ capacity to eliminate cholera. PMID:27307774

  18. TRUPACT-1 implementation plan

    SciTech Connect

    Hurley, J.D.; Tappen, J.J. . Joint Integration Office); Christensen, D.S. )

    1985-09-01

    TRUPACT-1, the TRansUranic PACkage Transporter is a packaging designed to transport defense contact handled transuranic (CH-TRU) waste from generating and interim TRU waste storage facilities to the Waste Isolation Pilot Plant (WIPP). Prior to fabrication and procurement of a full fleet, an initial design (TRUPACT-1) will be introduced to the defense TRU waste complex through use in an operational prototype fleet which will consist of Units 1, 2, and 3. In an effort to provide a relatively smooth introduction of the TRUPACT-1, the TRUPACT Technical Team (TTT) has developed the following implementation plan. The plan provides detailed information on user handling opportunities, schedules, equipment, responsibilities, reporting and data collection activities to be performed. The intent of this document is to provide users of the TRUPACT-1 with a guidance document, complete with references, that will allow the smooth introduction of this new transportation system by providing the information necessary for collecting operational, performance and cost data. These data will be used in modeling and full fleet design and procurement activities. In addition, these data will help fine tune procedures in the inspection and maintenance document and the operational document. Additional objectives of this plan are to aid in the establishment of site operational, inspection and maintenance procedures as well as training of site operators and briefing state and local officials.

  19. SU-E-T-130: Are Proton Gantries Needed? An Analysis of 4332 Patient Proton Gantry Treatment Plans From the Past 10 Years

    SciTech Connect

    Yan, S; Lu, H; Flanz, J; Depauw, N; Adams, J; Gorissen, BL; Wang, Y; Daartz, J; Bortfeld, T

    2015-06-15

    Purpose: To ascertain the necessity of a proton gantry, as compared to the feasibility of using a horizontal fixed proton beam-line for treatment with advanced technology. Methods: To calculate the percentage of patients that can be treated with a horizontal fixed beam-line instead of a gantry, we analyze the distributions of beam orientations of our proton gantry patients treated over the past 10 years. We identify three horizontal fixed beam geometries (FIXED, BEND and MOVE) with the patient in lying and/or sitting positions. The FIXED geometry includes only table/chair rotations and translations. In BEND, the beam can be bent up/down for up to 20 degrees. MOVE allows for patient head/body angle adjustment. Based on the analysis, we select eight patients whose plan involves beams which are still challenging to achieve with a horizontal fixed beam. These beams are removed in the pencil beam scanning (PBS) plan optimized for the fixed beam-line (PBS-fix). We generate non-coplanar PBS-gantry plans for comparison, and perform a robustness analysis. Results: The percentage of patients with head-and-neck/brain tumors that can be treated with horizontal fixed beam is 44% in FIXED, 70% in 20-degrees BEND, and 100% in 90-degrees MOVE. For torso regions, 99% of the patients can be treated in 20-degree BEND. The target coverage is more homogeneous with PBS-fix plans compared to the clinical scattering treatment plans. The PBS-fix plans reduce the mean dose to organs-at-risk by a factor of 1.1–28.5. PBS-gantry plans are as good as PBS-fix plans, sometimes marginally better. Conclusion: The majority of the beam orientations can be realized with a horizontal fixed beam-line. Challenging non-coplanar beams can be eliminated with PBS delivery. Clinical implementation of the proposed fixed beam-line requires use of robotic patient positioning, further developments in immobilization, and image guidance. However, our results suggest that fixed beam-lines can be as effective as

  20. Air Quality Implementation Plans

    EPA Pesticide Factsheets

    States must develop plans to attain and maintain air quality standards. These plans, known as SIPs, are submitted to EPA for approval. This web site contains information about this process and the current status of the submittals.

  1. Environmental implementation plan

    SciTech Connect

    Peterson, G.L.

    1994-10-04

    In this document, the Savannah River site environmental programs and plans from DOE contractors and Westinghouse Savannah River Company divisions/departments are presented along with the environmental coordinator for each program. The objectives are to enhase communication of existing or planned programs to do the following: identify activities required for meeting environmental needs; identify needing resources and a schedule to accomplish those activities; promote share-savings and consistency in those activities.

  2. 24 CFR 598.605 - Implementation plan.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 3 2014-04-01 2013-04-01 true Implementation plan. 598.605 Section... Grants § 598.605 Implementation plan. (a) Implementation plan content. An EZ must submit an implementation plan for HUD approval that addresses each project or activity proposed to be undertaken by the...

  3. 24 CFR 598.605 - Implementation plan.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 3 2013-04-01 2013-04-01 false Implementation plan. 598.605... Empowerment Zone Grants § 598.605 Implementation plan. (a) Implementation plan content. An EZ must submit an implementation plan for HUD approval that addresses each project or activity proposed to be undertaken by the...

  4. 340 Facility maintenance implementation plan

    SciTech Connect

    1995-03-01

    This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the 340 Facility. This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4B, Maintenance Management Program (DOE 1994), Chapter II. The objective of this plan is to provide baseline information for establishing and identifying Westinghouse Hanford Company (WHC) conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at the 340 Facility. Primary responsibility for the performance and oversight of maintenance activities at the 340 Facility resides with Westinghouse Hanford Company (WHC). Maintenance at the 340 Facility is performed by ICF-Kaiser Hanford (ICF-KH) South Programmatic Services crafts persons. This 340 Facility MIP provides interface requirements and responsibilities as they apply specifically to the 340 Facility. This document provides an implementation schedule which has been developed for items considered to be deficient or in need of improvement. The discussion sections, as applied to implementation at the 340 Facility, have been developed from a review of programs and practices utilizing the graded approach. Biennial review and additional reviews are conducted as significant programmatic and mission changes are made. This document is revised as necessary to maintain compliance with DOE requirements.

  5. Land Use Control Implementation Plan

    NASA Technical Reports Server (NTRS)

    Starr, Andrew Scott

    2015-01-01

    This Land Use Control Implementation Plan (LUCIP) has been prepared to inform current and potential future users of Building M7-505 of institutional controls that have been implemented at the site. Although there are no current unacceptable risks to human health or the environment associated with Building M7-505, institutional land use controls (LUCs) are necessary to prohibit the use of groundwater from the site. LUCs are also necessary to prevent access to soil under electrical equipment in the northwest portion of the site. Controls necessary to prevent human exposure will include periodic inspection, condition certification, and agency notification.

  6. 78 FR 28747 - Approval and Promulgation of Implementation Plans; North Carolina; State Implementation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; North Carolina; State Implementation Plan Miscellaneous Revisions AGENCY: Environmental Protection Agency (EPA). ACTION: Direct Final... Carolina State Implementation Plan (SIP) submitted on February 3, 2010, through the North...

  7. 10 CFR 820.65 - Implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Implementation plan. 820.65 Section 820.65 Energy... plan. With respect to a DOE Nuclear Safety Requirement for which there is no regulatory provision for an implementation plan or schedule, an exemption may be granted to establish an implementation...

  8. 10 CFR 820.65 - Implementation plan.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Implementation plan. 820.65 Section 820.65 Energy... plan. With respect to a DOE Nuclear Safety Requirement for which there is no regulatory provision for an implementation plan or schedule, an exemption may be granted to establish an implementation...

  9. Planning Targets for Phase II Watershed Implementation Plans

    EPA Pesticide Factsheets

    On August 1, 2011, EPA provided planning targets for nitrogen, phosphorus and sediment for the Phase II Watershed Implementation Plans (WIPs) of the Chesapeake Bay TMDL. This page provides the letters containing those planning targets.

  10. Individualized Career Plan (ICP): Implementation Manual.

    ERIC Educational Resources Information Center

    Batsche, Catherine; And Others

    This implementation manual was designed to assist local education agency personnel implement the individualized career plan (ICP) concept in high schools. Questions commonly asked about the ICP are answered. Guidelines are then provided for implementing the four stages of the process: planning, developing, implementing, and evaluating/refining.…

  11. Schedule optimization study implementation plan

    SciTech Connect

    Not Available

    1993-11-01

    This Implementation Plan is intended to provide a basis for improvements in the conduct of the Environmental Restoration (ER) Program at Hanford. The Plan is based on the findings of the Schedule Optimization Study (SOS) team which was convened for two weeks in September 1992 at the request of the U.S. Department of Energy (DOE) Richland Operations Office (RL). The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit (OU) Remedial Investigation/Feasibility Study (RI/FS) Work Plan. The SOS team was comprised of independent professionals from other federal agencies and the private sector experienced in environmental restoration within the federal system. The objective of the team was to examine reasons for the lengthy RI/FS process and recommend ways to expedite it. The SOS team issued their Final Report in December 1992. The report found the most serious impediments to cleanup relate to a series of management and policy issues which are within the control of the three parties managing and monitoring Hanford -- the DOE, U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology). The SOS Report identified the following eight cross-cutting issues as the root of major impediments to the Hanford Site cleanup. Each of these eight issues is quoted from the SOS Report followed by a brief, general description of the proposed approach being developed.

  12. Facility Planning for Technology Implementation.

    ERIC Educational Resources Information Center

    Ross, Tweed W.; Stewart, G. Kent

    1993-01-01

    When planning new school buildings or modifications to existing structures, checking facility planning in relation to technology planning is critical. Areas requiring serious attention include space, electricity, lighting, security, furnishings, shielding, and acoustics. (MLF)

  13. 77 FR 65151 - Approval and Promulgation of Implementation Plans and Designation of Areas for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-25

    ...EPA is proposing to approve: the State of New Hampshire's request to redesignate the Boston-Manchester-Portsmouth (SE), New Hampshire moderate 8-hour ozone nonattainment area to attainment for the 1997 8-hour ozone National Ambient Air Quality Standard (NAAQS); a State Implementation Plan (SIP) revision containing a 10-year maintenance plan for this area; a 2008 comprehensive emissions......

  14. Ten Years of the Safe Kids Campaign. Hearing on Examining the Success of the Safe Kids Campaign after Its 10 Years of Implementation of the Committee on Labor and Human Resources, United States Senate, One Hundred Fifth Congress, Second Session.

    ERIC Educational Resources Information Center

    Congress of the U.S., Washington, DC. Senate Committee on Labor and Human Resources.

    These hearings transcripts present testimony before a U.S. Senate Committee on the implementation and success of the Safe Kids campaign after 10 years. Statements at the hearing were provided by: Dr. C. Everett Koop, chairman of the National Safe Kids Campaign; Heather Paul, executive director of the National Safe Kids Campaign in Washington, DC;…

  15. 24 CFR 598.605 - Implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... URBAN DEVELOPMENT COMMUNITY FACILITIES URBAN EMPOWERMENT ZONES: ROUND TWO AND THREE DESIGNATIONS Empowerment Zone Grants § 598.605 Implementation plan. (a) Implementation plan content. An EZ must submit an... requirements that the state and local governments, as Empowerment Zone designees, have agreed to meet...

  16. 40 CFR 51.851 - State implementation plan (SIP) or Tribal implementation plan (TIP) revision.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 2 2012-07-01 2012-07-01 false State implementation plan (SIP) or... § 51.851 State implementation plan (SIP) or Tribal implementation plan (TIP) revision. (a) A State or... requirements, to demonstrate conformity with the applicable SIP or TIP as required by section 176(c) of the...

  17. 40 CFR 51.851 - State implementation plan (SIP) or Tribal implementation plan (TIP) revision.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 2 2013-07-01 2013-07-01 false State implementation plan (SIP) or... § 51.851 State implementation plan (SIP) or Tribal implementation plan (TIP) revision. (a) A State or... requirements, to demonstrate conformity with the applicable SIP or TIP as required by section 176(c) of the...

  18. 40 CFR 51.851 - State implementation plan (SIP) or Tribal implementation plan (TIP) revision.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 2 2014-07-01 2014-07-01 false State implementation plan (SIP) or... § 51.851 State implementation plan (SIP) or Tribal implementation plan (TIP) revision. (a) A State or... requirements, to demonstrate conformity with the applicable SIP or TIP as required by section 176(c) of the...

  19. 40 CFR 51.851 - State implementation plan (SIP) or Tribal implementation plan (TIP) revision.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 2 2011-07-01 2011-07-01 false State implementation plan (SIP) or... § 51.851 State implementation plan (SIP) or Tribal implementation plan (TIP) revision. (a) A State or... requirements, to demonstrate conformity with the applicable SIP or TIP as required by section 176(c) of the...

  20. Operational Management Plans: Status, Content, and Implementation

    DTIC Science & Technology

    1989-10-01

    A NATURAL RESOURCES RESEARCH PROGRAM US Amy CrpsMISCELLANEOUS PAPER R-89-2 ofEgier OPERATIONAL MANAGEMENT PLANS: STATUS, CONTENT , AND IMPLEMENTATION...NO NO. CCESSIONNO/ 32503 11. TITLE (incude Security Cla m karion) Operational Management Plans: Status, Content , and Implementation 12. PERSONAL...reverse if necessaty and identify by block number) - This report presents the current status, content , and implecrntation of Operational Management Plans

  1. 78 FR 61188 - Approval and Promulgation of Implementation Plans; Washington: Thurston County Second 10-Year PM10

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-03

    ... (c) Table 1--Washington Department of Ecology Regulations by: 0 i. Revising entries 173-433-030... Department of Ecology Regulations State State citation Title/subject effective EPA approval Explanations date... citation Title/subject effective EPA approval Explanations date date Washington Department of...

  2. 78 FR 46521 - Approval and Promulgation of Air Quality Implementation Plans; State of Colorado; Second 10-Year...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-01

    ... for the Colorado Springs area for the carbon monoxide (CO) National Ambient Air Quality Standard..., unless the context indicates otherwise. (ii) The words EPA, we, us or our mean or refer to the United.... II. Background Under the CAA Amendments of 1990, the Colorado Springs area was designated...

  3. Savannah River Site environmental implementation plan

    SciTech Connect

    Not Available

    1989-08-01

    Formal sitewide environmental planning at the Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  4. Savannah River Site Environmental Implementation Plan

    SciTech Connect

    Not Available

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  5. Technical evaluation report on the Third 10-year Interval Inservice Inspection Program Plan: Florida Power and Light Company, Turkey Point Nuclear Power Plant, Units 3 and 4 (Docket Numbers 50-250 and 50-251)

    SciTech Connect

    Brown, B.W.; Feige, E.J.; Galbraith, S.G.; Porter, A.M.

    1995-02-01

    This report presents the results of the evaluation of the Turkey Point Nuclear Power Plant, Units 3 and 4, Third 10-Year Interval Inservice Inspection Program Plan, Revision 0, submitted September 9, 1993, including the requests for relief from the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section XI, requirements that the licensee has determined to be impractical. The Turkey Point Nuclear Power Plant, Units 3 and 4, Third 10-Year Interval Inservice Inspection Program Plan is evaluated in Section 2 of this report. The inservice inspection (ISI) program plan is evaluated for (a) compliance with the appropriate edition/addenda of Section XI, (b) acceptability of the examination sample, (c) correctness of the application of system or component examination exclusion criteria, and (d) compliance with ISI-related commitments identified during previous Nuclear Regulatory Commission (NRC) reviews. The requests for relief are evaluated in Section 3 of this report.

  6. Chesapeake Bay Watershed Implementation Plans (WIPs)

    EPA Pesticide Factsheets

    This page provides an overview of Watershed Implementation Plans (WIP) and how they play an important role in restoring the Chesapeake Bay. The page also provides links to each jurisdiction's Phase I, II, and III WIP.

  7. A Structured Process for Implementing Strategic Planning.

    ERIC Educational Resources Information Center

    Goodin, Penny G.; Myers, William S.; Nichols, W. Randolph

    1998-01-01

    The Chesapeake (Virginia) Public Schools developed a strategic school-improvement plan with 178 recommendations representing certain goals: school safety, standards, effectiveness, efficiency, staff training, technology integration, community involvement, and facilities. The implementation process consisted of assigning responsibilities,…

  8. State Implementation Plan (SIP) Checklist Guide

    EPA Pesticide Factsheets

    Guidance documents and examples to assist air quality agencies of non-attainment areas in developing plans to implement national ambient air quality standards (NAAQS), including the ground-level ozone standard.

  9. Tactical Fuel and Energy Implementation Plan

    DTIC Science & Technology

    2010-09-24

    Technologies Corporation, in a briefing titled “ Software Modeling and Validation of a Microgrid ,” delivered to the Alternative Energy NOW Conference, Orlando...and Energy Implementation Plan 2 This plan is focused on the tactical environment, defined as maneuver brigade combat team (BCT) and below. The...Soldiers must clearly understand what is expected of them, and must know how to implement the new behaviors, once they have been defined

  10. SEPARATIONS AND WASTE FORMS CAMPAIGN IMPLEMENTATION PLAN

    SciTech Connect

    Vienna, John D.; Todd, Terry A.; Peterson, Mary E.

    2012-11-26

    This Separations and Waste Forms Campaign Implementation Plan provides summary level detail describing how the Campaign will achieve the objectives set-forth by the Fuel Cycle Reasearch and Development (FCRD) Program. This implementation plan will be maintained as a living document and will be updated as needed in response to changes or progress in separations and waste forms research and the FCRD Program priorities.

  11. State Plans for Implementing Programs of Study

    ERIC Educational Resources Information Center

    Lewis, Morgan V.; Overman, Laura

    2008-01-01

    This article examines how the states plan to implement the Programs of Study (POS) that were mandated by the 2006 reauthorization of the federal legislation for career and technical education. A coding system was developed for summarizing the methods described in the plans of all 50 states, the District of Columbia, Guam, and the Virgin Islands.…

  12. Coral Reef Protection Implementation Plan

    DTIC Science & Technology

    2007-11-02

    8217 Reprint (Orig + 2 copies) Z Technical Report (Orig + 2 copies) E] Manuscript (1 copy) " Final Progress Report (Orig + 2 copies) L’ Related Materials ...is and will continue take in the future to protect and conserve these unique to be, our policy to ensure safe and environmentally ecosystems. As...CZM plans. or fill material into waters of the United States. The Section 404(b)( I )guidelines. which are codified, set forth The delicate "pink

  13. Planning and Implementing Career Education Programs: Perspectives.

    ERIC Educational Resources Information Center

    Crim, Alonzo A.; And Others

    The collection of six papers offers perspectives on planning and implementing career education programs. The first paper, the Introduction (David Goodwin), deals with program implementation. The second paper, Priorities in Career Education (Alonzo A. Crim), describes the historical origins of career education in the Atlanta school system with a…

  14. Planning and Implementing a Global Studies Curriculum.

    ERIC Educational Resources Information Center

    Helmkamp, Caroline J.

    This report on the experimental Northeast Global Studies Middle Magnet School in Kansas City, Missouri, discusses the planning and implementation of a global studies curriculum to be implemented by the school. The 1990-1991 school year was the school's first as a magnet school under a consent decree issued by a federal judge. The decree was…

  15. 40 CFR 49.10046 - Contents of implementation plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...-Region X Implementation Plan for the Cow Creek Band of Umpqua Indians of Oregon § 49.10046 Contents of implementation plan. The implementation plan for the Reservation of the Cow Creek Band of Umpqua Indians...

  16. 40 CFR 49.10046 - Contents of implementation plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...-Region X Implementation Plan for the Cow Creek Band of Umpqua Indians of Oregon § 49.10046 Contents of implementation plan. The implementation plan for the Reservation of the Cow Creek Band of Umpqua Indians...

  17. 40 CFR 49.10046 - Contents of implementation plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...-Region X Implementation Plan for the Cow Creek Band of Umpqua Indians of Oregon § 49.10046 Contents of implementation plan. The implementation plan for the Reservation of the Cow Creek Band of Umpqua Indians...

  18. 40 CFR 49.11076 - Contents of implementation plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...-Region X Implementation Plan for the Confederated Tribes of the Warm Springs Reservation of Oregon § 49.11076 Contents of implementation plan. The implementation plan for the Warm Springs Reservation...

  19. 40 CFR 49.11076 - Contents of implementation plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...-Region X Implementation Plan for the Confederated Tribes of the Warm Springs Reservation of Oregon § 49.11076 Contents of implementation plan. The implementation plan for the Warm Springs Reservation...

  20. 40 CFR 49.11076 - Contents of implementation plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...-Region X Implementation Plan for the Confederated Tribes of the Warm Springs Reservation of Oregon § 49.11076 Contents of implementation plan. The implementation plan for the Warm Springs Reservation...

  1. 40 CFR 49.10166 - Contents of implementation plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...-Region X Implementation Plan for the Jamestown S'klallam Tribe of Washington § 49.10166 Contents of implementation plan. The implementation plan for the Reservation of the Jamestown S'Klallam Tribe consists of...

  2. 40 CFR 49.10166 - Contents of implementation plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...-Region X Implementation Plan for the Jamestown S'klallam Tribe of Washington § 49.10166 Contents of implementation plan. The implementation plan for the Reservation of the Jamestown S'Klallam Tribe consists of...

  3. 40 CFR 49.10166 - Contents of implementation plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...-Region X Implementation Plan for the Jamestown S'klallam Tribe of Washington § 49.10166 Contents of implementation plan. The implementation plan for the Reservation of the Jamestown S'Klallam Tribe consists of...

  4. Implementation of post treatment critical evaluation improved the quality of orthodontic care in postgraduate orthodontic clinic: A 10 years comparative study

    PubMed Central

    Verma, Rashmi; Utreja, Ashok Kumar; Singh, Satinder Pal; Jena, Ashok Kumar

    2015-01-01

    Objective: The aim of the study was to evaluate the effect of post- treatment critical evaluation on the quality of orthodontic care in a postgraduate orthodontic clinic. Materials and Methods: Orthodontic treatment outcome of 109 consecutively treated cases was evaluated in Phase-I evaluation. Following Phase-I evaluation, PTCE of each case was made mandatory. After 6-years of implementation of compulsory PTCE for each case, orthodontic treatment outcome of all consecutively treated cases (n = 126) was evaluated (Phase-II). The treatment outcome was evaluated by American Board of Orthodontics Model Grading System (ABO MGS) and Subjective evaluation (Visual Analogue Scale, VAS). Results: Based on the ABO scores, the cases were divided into three grades, that is, Grade-I, Grade-II, and Grade-III. The mean total ABO score was improved significantly in Phase-II evaluation (P < 0.01). The total number of cases in ABO Grade-II were increased significantly (P < 0.01) whereas cases in ABO Grade-I remained comparable. The VAS score was improved from 5.66 ± 0.77 at Phase-I to 6.02 ± 0.99 at Phase-II evaluation (P < 0.01). Conclusion: The implementation of PTCE significantly improved the quality of orthodontic care in a postgraduate orthodontic clinic. Clinical Significance: Grading one's own treatment improves the quality of future treatment. PMID:26392728

  5. Waste generator services implementation plan

    SciTech Connect

    Mousseau, J.; Magleby, M.; Litus, M.

    1998-04-01

    Recurring waste management noncompliance problems have spurred a fundamental site-wide process revision to characterize and disposition wastes at the Idaho National Engineering and Environmental Laboratory. The reengineered method, termed Waste Generator Services, will streamline the waste acceptance process and provide waste generators comprehensive waste management services through a single, accountable organization to manage and disposition wastes in a timely, cost-effective, and compliant manner. This report outlines the strategy for implementing Waste Generator Services across the INEEL. It documents the culmination of efforts worked by the LMITCO Environmental Management Compliance Reengineering project team since October 1997. These efforts have included defining problems associated with the INEEL waste management process; identifying commercial best management practices; completing a review of DOE Complex-wide waste management training requirements; and involving others through an Integrated Process Team approach to provide recommendations on process flow, funding/charging mechanisms, and WGS organization. The report defines the work that will be performed by Waste Generator Services, the organization and resources, the waste acceptance process flow, the funding approach, methods for measuring performance, and the implementation schedule and approach. Field deployment will occur first at the Idaho Chemical Processing Plant in June 1998. Beginning in Fiscal Year 1999, Waste Generator Services will be deployed at the other major INEEL facilities in a phased approach, with implementation completed by March 1999.

  6. Oracle accrual plans from requirements to implementation

    SciTech Connect

    Rivera, Christine K

    2009-01-01

    Implementing any new business software can be an intimidating prospect and this paper is intended to offer some insight in to how to approach this challenge with some fundamental rules for success. Los Alamos National Laboratory (LANL) had undergone an original ERP implementation of HRMS, Oracle Advanced Benefits, Worker Self Service, Manager Self Service, Project Accounting, Financials and PO, and recently completed a project to implement Oracle Payroll, Time and Labor and Accrual Plans. This paper will describe some of the important lessons that can be applied to any implementation as a whole, and then specifically how this knowledge was applied to the design and deployment of Oracle Accrual Plans for LANL. Finally, detail on the functionality available in Oracle Accrual Plans will be described, as well as the detailed setups.that were utilized at LANL.

  7. 76 FR 77178 - Approval and Promulgation of Implementation Plans; New York State Ozone Implementation Plan Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-12

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; New York State Ozone... Implementation Plan (SIP) for ozone concerning the control of volatile organic compounds. The proposed SIP... reductions that will help attain and maintain the national ambient air quality standards for ozone....

  8. NERSC Strategic Implementation Plan 2002-2006

    SciTech Connect

    Kramer, William; Bethel, Wes; Craw, James; Draney, Brent; Fortney, William; Gorda, Brend; Harris, William; Meyer, Nancy; Ng, Esmond; Verdier, Francesca; Walter, Howard; Welcome, Tammy

    2002-09-01

    This strategic proposal presents NERSC's vision for its activities and new directions over the next five years. NERSC's continuing commitment to providing high-end systems and comprehensive scientific support for its users will be enhanced, and these activities will be augmented by two new strategic thrusts: support for Scientific Challenge Teams and deployment of a Unified Science Environment. The proposal is in two volumes, the Strategic Plan and the Implementation Plan.

  9. 40 CFR 209.10 - Approval of plan, implementation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Approval of plan, implementation. (a) If the Administrator finds that the remedial plan is designed to... 40 Protection of Environment 25 2011-07-01 2011-07-01 false Approval of plan, implementation. 209... implementation of the approved plan upon receipt of notice from the Administrator that the remedial plan has...

  10. Enterprise Resource Planning Implementation in Higher Education

    ERIC Educational Resources Information Center

    Graham, James F.

    2009-01-01

    Enterprise resource planning (ERP) implementation projects are unique to each institution and yet are expensive, time consuming, and result in change across the institution. Five Midwest public and private 4-year higher education institutions were studied to determine the impact of five specific key factors on the overall success of the ERP…

  11. How to Plan and Implement a Workshop.

    ERIC Educational Resources Information Center

    Howell, Jacquie

    These guidelines were developed to assist school administrators who have the responsibility of organizing a one- to three-day professional development program. The first section outlines the tasks involved in planning and implementing a workshop. The remaining sections cover the following: (1) developing and utilizing the workshop theme; (2)…

  12. Marketing Internships: A Planning and Implementation Guide.

    ERIC Educational Resources Information Center

    Faught, Suzanne G.

    This planning and implementation guide is designed to assist marketing educators and others supportive of marketing education. It begins with definitions of vocabulary of related terminology and descriptions of the four models of internships presented in the guide: full-year, rotation-type format; 1-semester, rotation-type format; full-year format…

  13. NASA Education Implementation Plan 2015-2017

    ERIC Educational Resources Information Center

    National Aeronautics and Space Administration, 2015

    2015-01-01

    The NASA Education Implementation Plan (NEIP) provides an understanding of the role of NASA in advancing the nation's STEM education and workforce pipeline. The document outlines the roles and responsibilities that NASA Education has in approaching and achieving the agency's and administration's strategic goals in STEM Education. The specific…

  14. 24 CFR 598.605 - Implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... economic development standards of this subpart. (b) Proposed funded project or activity. The project or activity proposed in the implementation plan is subject to the following requirements: (1) The Federal... of 1970 (URA) (42 U.S.C. 4601 et seq.); (4) The environmental review and approval requirements of...

  15. Hanford Environmental Management Program implementation plan

    SciTech Connect

    Not Available

    1988-08-01

    The Hanford Environmental Management Program (HEMP) was established to facilitate compliance with the applicable environmental statues, regulations, and standards on the Hanford Site. The HEMP provides a structured approach to achieve environmental management objectives. The Hanford Environmental Management Program Plan (HEMP Plan) was prepared as a strategic level planning document to describe the program management, technical implementation, verification, and communications activities that guide the HEMP. Four basic program objectives are identified in the HEMP Plan as follows: establish ongoing monitoring to ensure that Hanford Site operations comply with environmental requirements; attain regulatory compliance through the modification of activities; mitigate any environmental consequences; and minimize the environmental impacts of future operations at the Hanford Site. 2 refs., 24 figs., 27 tabs.

  16. 78 FR 69625 - Approval and Promulgation of Implementation Plans; New York State Ozone Implementation Plan Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-20

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION... Implementation Plan Revision AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: The Environmental Protection Agency (EPA) is proposing to approve a revision to the New York State...

  17. Interim Land Use Control Implementation Plan

    NASA Technical Reports Server (NTRS)

    Applegate, Joseph L.

    2014-01-01

    This Interim Land Use Control Implementation Plan (LUCIP) has been prepared to inform current and potential future users of the Kennedy Space Center (KSC) Contractors Road Heavy Equipment (CRHE) Area (SWMU 055; "the Site") of institutional controls that have been implemented at the Site1. Although there are no current unacceptable risks to human health or the environment associated with the CRHE Area, an interim institutional land use control (LUC) is necessary to prevent human health exposure to volatile organic compound (VOC)-affected groundwater at the Site. Controls will include periodic inspection, condition certification, and agency notification.

  18. 47 CFR 51.213 - Toll dialing parity implementation plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 3 2013-10-01 2013-10-01 false Toll dialing parity implementation plans. 51... parity implementation plans. (a) A LEC must file a plan for providing intraLATA toll dialing parity... dialing parity within a state until the implementation plan has been approved by the appropriate...

  19. 47 CFR 51.213 - Toll dialing parity implementation plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 3 2014-10-01 2014-10-01 false Toll dialing parity implementation plans. 51... parity implementation plans. (a) A LEC must file a plan for providing intraLATA toll dialing parity... dialing parity within a state until the implementation plan has been approved by the appropriate...

  20. 47 CFR 51.213 - Toll dialing parity implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 3 2010-10-01 2010-10-01 false Toll dialing parity implementation plans. 51... parity implementation plans. (a) A LEC must file a plan for providing intraLATA toll dialing parity... dialing parity within a state until the implementation plan has been approved by the appropriate...

  1. 47 CFR 51.213 - Toll dialing parity implementation plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 3 2012-10-01 2012-10-01 false Toll dialing parity implementation plans. 51... parity implementation plans. (a) A LEC must file a plan for providing intraLATA toll dialing parity... dialing parity within a state until the implementation plan has been approved by the appropriate...

  2. 47 CFR 51.213 - Toll dialing parity implementation plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 3 2011-10-01 2011-10-01 false Toll dialing parity implementation plans. 51... parity implementation plans. (a) A LEC must file a plan for providing intraLATA toll dialing parity... dialing parity within a state until the implementation plan has been approved by the appropriate...

  3. Tactical Fuel and Energy Implementation Plan

    DTIC Science & Technology

    2010-09-24

    Software Modeling and Validation of a Microgrid ,” delivered to the Alternative Energy NOW Conference, Orlando, FL, 9 February 2010. 34Ibid. 35...This plan is focused on the tactical environment, defined as maneuver brigade combat team (BCT) and below. The study team developed the objectives...what is expected of them, and must know how to implement the new behaviors, once they have been defined . Education is essential in establishing

  4. Gen IV Materials Handbook Implementation Plan

    SciTech Connect

    Rittenhouse, P.; Ren, W.

    2005-03-29

    A Gen IV Materials Handbook is being developed to provide an authoritative single source of highly qualified structural materials information and materials properties data for use in design and analyses of all Generation IV Reactor Systems. The Handbook will be responsive to the needs expressed by all of the principal government, national laboratory, and private company stakeholders of Gen IV Reactor Systems. The Gen IV Materials Handbook Implementation Plan provided here addresses the purpose, rationale, attributes, and benefits of the Handbook and will detail its content, format, quality assurance, applicability, and access. Structural materials, both metallic and ceramic, for all Gen IV reactor types currently supported by the Department of Energy (DOE) will be included in the Gen IV Materials Handbook. However, initial emphasis will be on materials for the Very High Temperature Reactor (VHTR). Descriptive information (e.g., chemical composition and applicable technical specifications and codes) will be provided for each material along with an extensive presentation of mechanical and physical property data including consideration of temperature, irradiation, environment, etc. effects on properties. Access to the Gen IV Materials Handbook will be internet-based with appropriate levels of control. Information and data in the Handbook will be configured to allow search by material classes, specific materials, specific information or property class, specific property, data parameters, and individual data points identified with materials parameters, test conditions, and data source. Details on all of these as well as proposed applicability and consideration of data quality classes are provided in the Implementation Plan. Website development for the Handbook is divided into six phases including (1) detailed product analysis and specification, (2) simulation and design, (3) implementation and testing, (4) product release, (5) project/product evaluation, and (6) product

  5. 40 CFR 49.9866 - Contents of implementation plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Implementation Plan for the Burns Paiute Tribe of the Burns Paiute Indian Colony of Oregon § 49.9866 Contents of implementation plan. The implementation plan for the Reservation of the Burns Paiute Indian Colony consists of...) Section 49.131General rule for open burning. (h) Section 49.135Rule for emissions detrimental to...

  6. 40 CFR 49.9866 - Contents of implementation plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Implementation Plan for the Burns Paiute Tribe of the Burns Paiute Indian Colony of Oregon § 49.9866 Contents of implementation plan. The implementation plan for the Reservation of the Burns Paiute Indian Colony consists of...) Section 49.131General rule for open burning. (h) Section 49.135Rule for emissions detrimental to...

  7. 49 CFR 1560.109 - Aircraft Operator Implementation Plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 9 2012-10-01 2012-10-01 false Aircraft Operator Implementation Plan. 1560.109... Collection and Transmission of Secure Flight Passenger Data for Watch List Matching § 1560.109 Aircraft Operator Implementation Plan. (a) Content of the Aircraft Operator Implementation Plan (AOIP). Each...

  8. 49 CFR 1560.109 - Aircraft Operator Implementation Plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Aircraft Operator Implementation Plan. 1560.109... Collection and Transmission of Secure Flight Passenger Data for Watch List Matching § 1560.109 Aircraft Operator Implementation Plan. (a) Content of the Aircraft Operator Implementation Plan (AOIP). Each...

  9. 49 CFR 1560.109 - Aircraft Operator Implementation Plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 9 2014-10-01 2014-10-01 false Aircraft Operator Implementation Plan. 1560.109... Collection and Transmission of Secure Flight Passenger Data for Watch List Matching § 1560.109 Aircraft Operator Implementation Plan. (a) Content of the Aircraft Operator Implementation Plan (AOIP). Each...

  10. 49 CFR 1560.109 - Aircraft Operator Implementation Plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 9 2013-10-01 2013-10-01 false Aircraft Operator Implementation Plan. 1560.109... Collection and Transmission of Secure Flight Passenger Data for Watch List Matching § 1560.109 Aircraft Operator Implementation Plan. (a) Content of the Aircraft Operator Implementation Plan (AOIP). Each...

  11. 49 CFR 1560.109 - Aircraft Operator Implementation Plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 9 2011-10-01 2011-10-01 false Aircraft Operator Implementation Plan. 1560.109... Collection and Transmission of Secure Flight Passenger Data for Watch List Matching § 1560.109 Aircraft Operator Implementation Plan. (a) Content of the Aircraft Operator Implementation Plan (AOIP). Each...

  12. F-16 Implementation and Management. Plan Report.

    DTIC Science & Technology

    1981-03-01

    JXPK1R - .EELOPMENT RER6-.Jio. 18 ,v MARCH, -1" Prepared in fulfillment of CDRL nos. B028, B029, B030, B033, B050, B057, B059 II LECTEI by S JUNO 8...implementation and management plan report (F-16 Development Report No. 18 ). San Diego, Calif.: Courseware, Inc., October 1978, March 1981. Sudweeks...Instruction .............. 17 v . E . CONTENTS (Cont.) Page 3.4 Student Training and Measurement ......... 18 3.4.1 Academic events .............. 18 3.4.2

  13. Implementing Manufacturing Resources Planning for Marine Corps

    DTIC Science & Technology

    1989-06-01

    business planning , production planning, master production planning, capacity requirements planning, and the execution support systems for capacity and...during the following discussion. [Refs. 7 and 131 General business planning sets the overall objectives for the manufacturing concern. The overall...materials plan then generates a set of purchasing and manufacturing requirements that are necessary 57 BUSINESS PLANNING OBJECTIVES MARKETING PLANNING

  14. Environmental Restoration Quality Program Implementation Plan

    SciTech Connect

    Not Available

    1992-08-01

    The Environmental Restoration (ER) Program requirements for implementation of DOE Order 5700.6C are identified in the Environmental Restoration Quality Program Plan, (QPP). Management systems necessary to implement the ER QPP consist of the necessary standards and procedures required to be developed to adequately control ER processes. To the extent possible, Martin Marietta Energy Systems, Inc., standards and procedures will be utilized at the ER Program level, and requirements will not be repeated. The quality management systems identified for enhancement or development are identified in the section on Procedure Development Strategy and directly relate to unique ER Program activities. Procedures and standards that currently exist in the ER Program will be validated for compliance with ER QPP requirements.

  15. Implementation Issues for Departure Planning Systems

    NASA Technical Reports Server (NTRS)

    Hansman, R. John; Feron, Eric; Clarke, John-Paul; Odoni, Amedeo

    1999-01-01

    The objective of the proposed effort is to investigate issues associated with the design and implementation of decision aiding tools to assist in improving the departure process at congested airports. This effort follows a preliminary investigation of potential Departure Planning approaches and strategies, which identified potential benefits in departure efficiency, and also in reducing the environmental impact of aircraft in the departure queue. The preliminary study bas based, in large part, on observations and analysis of departure processes at Boston, Logan airport. The objective of this follow-on effort is to address key implementation issues and to expand the observational base to include airports with different constraints and traffic demand. Specifically, the objectives of this research are to: (1) Expand the observational base to include airports with different underlying operational dynamics. (2) Develop prototype decision aiding algorithms/approaches and assess potential benefits. and (3) Investigate Human Machine Integration (HMI) issues associated with decision aids in tower environments.

  16. WHC natural phenomena hazards mitigation implementation plan

    SciTech Connect

    Conrads, T.J.

    1996-09-11

    Natural phenomena hazards (NPH) are unexpected acts of nature which pose a threat or danger to workers, the public or to the environment. Earthquakes, extreme winds (hurricane and tornado),snow, flooding, volcanic ashfall, and lightning strike are examples of NPH at Hanford. It is the policy of U.S. Department of Energy (DOE) to design, construct and operate DOE facilitiesso that workers, the public and the environment are protected from NPH and other hazards. During 1993 DOE, Richland Operations Office (RL) transmitted DOE Order 5480.28, ``Natural Phenomena Hazards Mitigation,`` to Westinghouse Hanford COmpany (WHC) for compliance. The Order includes rigorous new NPH criteria for the design of new DOE facilities as well as for the evaluation and upgrade of existing DOE facilities. In 1995 DOE issued Order 420.1, ``Facility Safety`` which contains the same NPH requirements and invokes the same applicable standards as Order 5480.28. It will supersede Order 5480.28 when an in-force date for Order 420.1 is established through contract revision. Activities will be planned and accomplished in four phases: Mobilization; Prioritization; Evaluation; and Upgrade. The basis for the graded approach is the designation of facilities/structures into one of five performance categories based upon safety function, mission and cost. This Implementation Plan develops the program for the Prioritization Phase, as well as an overall strategy for the implemention of DOE Order 5480.2B.

  17. Science operations planning and implementation for Rosetta

    NASA Astrophysics Data System (ADS)

    Koschny, Detlef; Sweeney, Mark; Montagon, Elsa; Hoofs, Raymond; van der Plas, Peter

    2002-07-01

    The Rosetta mission is a cornerstone mission of the Horizon 2000 programme of the European Space Agency. It will be launched to comet 46P/Wirtanen in January 2003. This mission is the first of a series of planetary missions, including Mars Express, Smart-I (to the Moon), and BepiColombo (to Mercury). All these missions have similar requirements for their scientific operations. The Experiments H/W and S/W are developed by Principal Investigators, working at scientific institutes. They are also responsible for the operation of their experiments and for the generation of related operational documentation. The Science Operations Centre (SOC) has the task to consolidate the inputs of the different experimenters and the Lander and ensure that the resulting science operations timeline is free of conflicts. It forwards this timeline to the Mission Operations Centre (MOC) which combines the science operations with the operations of the other spacecraft subsystems and the orbit and attitude of the spacecraft. The MOC is also responsible for uplinking the operational command sequences to the spacecraft and for returning the received telemetry to the user. In a collaboration between the team of the Rosetta Project Scientist at the Research and Science Support Department of ESA/ESTEC and the European Space Operations Centre (ESA/ESOC), a concept for the SOC/MOC and their interfaces was developed for the Rosetta mission. This concept is generic enough to allow its implementation also for the other planetary missions. The design phase is now complete, and implementation is on-going. This paper briefly presents the architecture of the complex ground segment, concentrating on the elements required for planning of scientific operations, and then details the software tools EPS (Experiment Planning System) and PTB (Project Test Bed) which are used in the planning process.

  18. 75 FR 29897 - Approval and Promulgation of Implementation Plans; New York State Implementation Plan Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-28

    .... What is the history and time frame for State Implementation Plan (SIP) submissions? II. What was... is EPA's conclusion? V. Statutory and Executive Order Reviews I. What is the history and time frame... Container Spillage Control.'' The intended effect of this action is to approve control strategies,...

  19. 77 FR 13974 - Approval and Promulgation of Implementation Plans; New York State Ozone Implementation Plan Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-08

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; New York State Ozone... (SIP) for ozone concerning the control of volatile organic compounds. The proposed SIP revision... will help attain and maintain the national ambient air quality standards for ozone. DATES:...

  20. Administrator's Guide to Technology: Planning, Funding & Implementation.

    ERIC Educational Resources Information Center

    Aspen Education Development Group, Gaithersburg, MD.

    This document provides guidelines for administrators related to instructional technology and planning. Chapter 1 discusses planning, including developing a technology plan, facility assessment, e-rate planning, formation of a technology committee, budget planning, and hardware/software replacement plan and costs. Chapter 2 addresses…

  1. Swift: 10 Years of Discovery

    NASA Astrophysics Data System (ADS)

    The conference Swift: 10 years of discovery was held in Roma at La Sapienza University on Dec. 2-5 2014 to celebrate 10 years of Swift successes. Thanks to a large attendance and a lively program, it provided the opportunity to review recent advances of our knowledge of the high-energy transient Universe both from the observational and theoretical sides. When Swift was launched on November 20, 2004, its prime objective was to chase Gamma-Ray Bursts and deepen our knowledge of these cosmic explosions. And so it did, unveiling the secrets of long and short GRBs. However, its multi-wavelength instrumentation and fast scheduling capabilities made it the most versatile mission ever flown. Besides GRBs, Swift has observed, and contributed to our understanding of, an impressive variety of targets including AGNs, supernovae, pulsars, microquasars, novae, variable stars, comets, and much more. Swift is continuously discovering rare and surprising events distributed over a wide range of redshifts, out to the most distant transient objects in the Universe. Such a trove of discoveries has been addressed during the conference with sessions dedicated to each class of events. Indeed, the conference in Rome was a spectacular celebration of the Swift 10th anniversary. It included sessions on all types of transient and steady sources. Top scientists from around the world gave invited and contributed talks. There was a large poster session, sumptuous lunches, news interviews and a glorious banquet with officials attending from INAF and ASI. All the presentations, as well as several conference pictures, can be found in the conference website (http://www.brera.inaf.it/Swift10/Welcome.html). These proceedings have been collected owing to the efforts of Paolo D’Avanzo who has followed each paper from submission to final acceptance. Our warmest thanks to Paolo for all his work. The Conference has been made possible by the support from La Sapienza University as well as from the ARAP

  2. Solid Waste Assurance Program Implementation Plan

    SciTech Connect

    Irons, L.G.

    1995-06-19

    On June 6, 1995, a waiver to Hanford Site Solid Waste Acceptance Criteria, was approved by the US Department of Energy Richland Operations Office (RL) to replace the low-level, mixed, and transuranic (TRU) generator assessment programs with the Solid Waste Assurance Program (SWAP). This is associated with a waiver that was approved on March 16, 1995 to replace the Storage/Disposal Approval Record (SDAR) requirements with the Waste Specification System (WSS). This implementation plan and the SWAP applies to Solid Waste Disposal (SWD) functions, facilities, and personnel who perform waste acceptance, verification, receipt, and management functions of dangerous, radioactive, and mixed waste from on- and off-site generators who ship to or within the Hanford Site for treatment, storage, and/or disposal (TSD) at SWD TSD facilities.

  3. 49 CFR 130.33 - Response plan implementation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION OIL TRANSPORTATION OIL SPILL PREVENTION AND RESPONSE PLANS § 130.33 Response plan implementation. If, during transportation of oil subject to this part, a... management authority of, the United States—the person transporting the oil shall implement the plan...

  4. 49 CFR 130.33 - Response plan implementation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION OIL TRANSPORTATION OIL SPILL PREVENTION AND RESPONSE PLANS § 130.33 Response plan implementation. If, during transportation of oil subject to this part, a... management authority of, the United States—the person transporting the oil shall implement the plan...

  5. 49 CFR 130.33 - Response plan implementation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION OIL TRANSPORTATION OIL SPILL PREVENTION AND RESPONSE PLANS § 130.33 Response plan implementation. If, during transportation of oil subject to this part, a... management authority of, the United States—the person transporting the oil shall implement the plan...

  6. 49 CFR 130.33 - Response plan implementation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION OIL TRANSPORTATION OIL SPILL PREVENTION AND RESPONSE PLANS § 130.33 Response plan implementation. If, during transportation of oil subject to this part, a... management authority of, the United States—the person transporting the oil shall implement the plan...

  7. 49 CFR 130.33 - Response plan implementation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION OIL TRANSPORTATION OIL SPILL PREVENTION AND RESPONSE PLANS § 130.33 Response plan implementation. If, during transportation of oil subject to this part, a... management authority of, the United States—the person transporting the oil shall implement the plan...

  8. 12 CFR 1291.3 - AHP Implementation Plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AHP Implementation Plan without first consulting its Advisory Council. The Bank's board of directors...) Advisory Council review. Prior to the amendment of a Bank's AHP Implementation Plan, the Bank shall provide... recommendations to the Bank's board of directors for its consideration. (c) Notification of Plan amendments to...

  9. 40 CFR 49.9926 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes-Region X Implementation Plan for the Coeur D'alene Tribe of the Coeur D'alene Reservation, Idaho § 49.9926 Contents...

  10. Getting Started: Planning and Implementing Computer Instruction in Schools.

    ERIC Educational Resources Information Center

    Mojkowski, Charles

    Intended for use by local school district staff, this manual provides step-by-step guidelines for planning and implementing the incorporation of computer-based instruction in the curriculum. Procedures involved in five phases of planning and implementation are outlined, covering: (1) preliminary planning, where schools should establish planning…

  11. 76 FR 33651 - Approval and Promulgation of Implementation Plans; ID

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-09

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; ID AGENCY: Environmental... Implementation Plan (SIP) that were submitted to EPA by the State of Idaho on April 16, 2007. This SIP submittal... through 668. Sec. 52.670 Identification of plan. * * * * * (c) * * * EPA-Approved Idaho Regulations...

  12. 75 FR 3680 - Revisions to the California State Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-22

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan AGENCY: Environmental... Implementation Plan (SIP). These revisions concern oxides of nitrogen (NO X ) from residential water heaters. We... 1990 (CAA or the Act). We are taking comments on this proposal and plan to follow with a final...

  13. 77 FR 24160 - Revisions to the Hawaii State Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-23

    ... AGENCY 40 CFR Part 52 Revisions to the Hawaii State Implementation Plan AGENCY: Environmental Protection... Implementation Plan (SIP). These revisions would update and replace the minor new source review rules that EPA... not plan to open a second comment period, so anyone interested in commenting should do so at this...

  14. 77 FR 25111 - Revisions to the Hawaii State Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-27

    ... AGENCY 40 CFR Part 52 Revisions to the Hawaii State Implementation Plan AGENCY: Environmental Protection... Implementation Plan (SIP). These revisions concern volatile organic compound (VOC), oxides of nitrogen (NO X... not plan to open a second comment period, so anyone interested in commenting should do so at this...

  15. 77 FR 51619 - Source Specific Federal Implementation Plan for Implementing Best Available Retrofit Technology...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-24

    ... Implementation Plan for Implementing Best Available Retrofit Technology for Four Corners Power Plant: Navajo... for Implementing Best Available Retrofit Technology for Four Corners Power Plant: Navajo Nation AGENCY... promulgating a source-specific Federal Implementation Plan (FIP) requiring the Four Corners Power Plant...

  16. Implementation of Discharge Plans for Chronically Ill Elders Discharged Home.

    ERIC Educational Resources Information Center

    Proctor, Enola K.; And Others

    1996-01-01

    Addresses the extent to which discharge plans for elderly patients with congestive heart failure were implemented as planned, tested the consequences of implementation problems, and identified factors associated with implementation problems. Implications for hospital discharge planners and home health care are discussed. (KW)

  17. Implementation planning for industrial energy conservation: approach and methodology

    SciTech Connect

    Alston, T.G.; Falk, G.; Grogan, P.J.; Katz, D.; Tatar, J.

    1981-01-01

    Details of an industry-specific Conservation Technology Implementation Branch implementation plan is described in detail. CTIB has conducted implementation planning in the steel, pulp/paper, and agriculture/food processing industries, but in FY 1981, CTIB plans to conduct planning for the chemicals, petroleum refining, aluminum, glass, cement, and textile industries. Guidelines are presented for each contractor for each industry toward a common methodology in terms of approach, areas of analysis, assumptions, and reporting. The major parts of the CTIB plan are: an implementation study consisting of technology selection, market demand analysis, and policy analysis, and a plan consisting of a detailed description and schedule of future CTIB actions, followed by a recommended system for monitoring market results when the plan is implemented. (MCW)

  18. Easing the Transition: How to Implement an Automated Succession Plan.

    ERIC Educational Resources Information Center

    Andrews, Jean P.

    1989-01-01

    An automated succession plan can create smooth transitions when employees transfer or leave the company. It can also boost productivity and employee morale. (Includes a basic nine-step implementation plan that makes the process easy and relatively painless.) (JOW)

  19. 40 CFR 93.124 - Using the motor vehicle emissions budget in the applicable implementation plan (or implementation...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... budget in the applicable implementation plan (or implementation plan submission). 93.124 Section 93.124... implementation plan (or implementation plan submission) with respect to its motor vehicle emissions budget(s... MPO may not interpret the budget to be higher than the implementation plan's estimate of...

  20. 40 CFR 93.124 - Using the motor vehicle emissions budget in the applicable implementation plan (or implementation...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... budget in the applicable implementation plan (or implementation plan submission). 93.124 Section 93.124... implementation plan (or implementation plan submission) with respect to its motor vehicle emissions budget(s... MPO may not interpret the budget to be higher than the implementation plan's estimate of...

  1. 40 CFR 49.9956 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... detrimental to public health or welfare. (k) Section 49.137Rule for air pollution episodes. (l) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (m) Section 49... ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan...

  2. 40 CFR 49.9896 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  3. 40 CFR 49.9986 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... for emissions detrimental to public health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of... ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan...

  4. 40 CFR 49.9926 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Coeur D'alene Tribe of the Coeur D'alene Reservation, Idaho § 49.9926 Contents of...

  5. 40 CFR 49.9866 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan...

  6. 40 CFR 93.151 - State implementation plan (SIP) revision.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 21 2012-07-01 2012-07-01 false State implementation plan (SIP... implementation plan (SIP) revision. The provisions and requirements of this subpart to demonstrate conformity... nonattainment and maintenance areas where EPA has not approved the General Conformity SIP revision allowed...

  7. 40 CFR 93.151 - State implementation plan (SIP) revision.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 21 2013-07-01 2013-07-01 false State implementation plan (SIP... implementation plan (SIP) revision. The provisions and requirements of this subpart to demonstrate conformity... nonattainment and maintenance areas where EPA has not approved the General Conformity SIP revision allowed...

  8. 40 CFR 93.151 - State implementation plan (SIP) revision.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false State implementation plan (SIP... implementation plan (SIP) revision. The Federal conformity rules under this subpart, in addition to any existing... requirements until such time as the required conformity SIP revision is approved by EPA. A State's...

  9. 40 CFR 93.151 - State implementation plan (SIP) revision.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 20 2011-07-01 2011-07-01 false State implementation plan (SIP... implementation plan (SIP) revision. The provisions and requirements of this subpart to demonstrate conformity... nonattainment and maintenance areas where EPA has not approved the General Conformity SIP revision allowed...

  10. 40 CFR 93.151 - State implementation plan (SIP) revision.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 20 2014-07-01 2013-07-01 true State implementation plan (SIP... implementation plan (SIP) revision. The provisions and requirements of this subpart to demonstrate conformity... nonattainment and maintenance areas where EPA has not approved the General Conformity SIP revision allowed...

  11. 40 CFR 49.10526 - Contents of implementation plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Contents of implementation plan. The implementation plan for the lands in trust that are within the... detrimental to public health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section...

  12. 76 FR 31973 - Draft WaterSMART Strategic Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-02

    ... Draft WaterSMART Strategic Implementation Plan AGENCY: Office of the Assistant Secretary for Water and Science, Interior. ACTION: Notice of availability. SUMMARY: The Department of the Interior's draft Water... Strategic Implementation Plan) identifies activities that will be undertaken to secure and stretch...

  13. Westinghouse Hanford Company Pollution Prevention Program Implementation Plan

    SciTech Connect

    Floyd, B.C.

    1994-10-01

    This plan documents Westinghouse Hanford Company`s (WHC) Pollution Prevention (P2) (formerly Waste Minimization) program. The program includes WHC; BCS Richland, Inc. (BCSR); and ICF Kaiser Hanford Company (ICF KH). The plan specifies P2 program activities and schedules for implementing the Hanford Site Waste Minimization and Pollution Prevention Awareness (WMin/P2) Program Plan requirements (DOE 1994a). It is intended to satisfy the U.S. Department of Energy (DOE) and other legal requirements that are discussed in both the Hanford Site WMin/P2 plan and paragraph C of this plan. As such, the Pollution Prevention Awareness Program required by DOE Order 5400.1 (DOE 1988) is included in the WHC P2 program. WHC, BCSR, and ICF KH are committed to implementing an effective P2 program as identified in the Hanford Site WMin/P2 Plan. This plan provides specific information on how the WHC P2 program will develop and implement the goals, activities, and budget needed to accomplish this. The emphasis has been to provide detailed planning of the WHC P2 program activities over the next 3 years. The plan will guide the development and implementation of the program. The plan also provides background information on past program activities. Because the plan contains greater detail than in the past, activity scope and implementation schedules may change as new priorities are identified and new approaches are developed and realized. Some activities will be accelerated, others may be delayed; however, all of the general program elements identified in this plan and contractor requirements identified in the Site WMin/P2 plan will be developed and implemented during the next 3 years. This plan applies to all WHC, BCSR, and ICF KH organizations and subcontractors. It will be distributed to those with defined responsibilities in this plan; and the policy, goals, objectives, and strategy of the program will be communicated to all WHC, BCSR, and ICF KH employees.

  14. Savannah River Site environmental implementation plan. Volume 1, Executive summary

    SciTech Connect

    Not Available

    1989-08-01

    Formal sitewide environmental planning at the Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  15. Savannah River Site Environmental Implementation Plan. Volume 2, Protection programs

    SciTech Connect

    Not Available

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  16. 78 FR 18936 - Revision to the California State Implementation Plan, South Coast Air Quality Management Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-28

    ... From the Federal Register Online via the Government Publishing Office ] ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Revision to the California State Implementation Plan, South Coast Air Quality Management Plan AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA...

  17. Implementing a strategic recruitment and retention plan.

    PubMed

    Smeltzer, C H; Tseng, S; Harty, L M

    1991-06-01

    Nurse administrators were faced with how to staff for a rapid expansion in number of beds in the face of a 15% nurse vacancy rate. The authors discuss how they addressed this issue through their multifaceted strategic plan.

  18. 50 CFR 600.1008 - Implementation plan and implementation regulations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... relevant aspects of implementing the program, including: (1) The reduction fishery; (2) The reduction... program, including: (1) The reduction fishery; (2) The reduction methodology; (3) The maximum reduction... will: (1) Specify, for invitations to bid, bids, and reduction contracts under § 600.1009: (i)...

  19. 76 FR 17584 - Approval and Promulgation of Implementation Plans; Oklahoma; Regional Haze State Implementation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-30

    ... Implementation Plan; Federal Implementation Plan for Interstate Transport of Pollution Affecting Visibility and...: Announcement of public hearing. SUMMARY: On March 22, 2011, EPA published a proposal in the Federal Register to... EPA announced an open house and public hearing for the proposal to be held April 13, 2011, in...

  20. Sulfur Dioxide State Implementation Plan (SIP) Checklist Guide

    EPA Pesticide Factsheets

    Tools, guidance, and examples to assist air quality agencies of non-attainment areas in developing plans to implement national ambient air quality standards (NAAQS), including the sulfur dioxide (SO2) air emissions standard.

  1. 40 CFR 49.9986 - Contents of implementation plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Implementation Plan for the Confederated Tribes of the Coos, Lower Umpqua and Siuslaw Indians of Oregon § 49.9986... the Coos, Lower Umpqua and Siuslaw Indians consists of the following rules, regulations, and...

  2. 40 CFR 49.9986 - Contents of implementation plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Implementation Plan for the Confederated Tribes of the Coos, Lower Umpqua and Siuslaw Indians of Oregon § 49.9986... the Coos, Lower Umpqua and Siuslaw Indians consists of the following rules, regulations, and...

  3. 40 CFR 49.9986 - Contents of implementation plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Implementation Plan for the Confederated Tribes of the Coos, Lower Umpqua and Siuslaw Indians of Oregon § 49.9986... the Coos, Lower Umpqua and Siuslaw Indians consists of the following rules, regulations, and...

  4. Implementing the Aquidneck Island West Side Master Plan

    EPA Pesticide Factsheets

    This report describes a technical assistance project with Aquidneck Island to develop approaches for mixed-use zoning standards, design guidelines, and review processes to implement the West Side Master Plan.

  5. State Waste Discharge Permit ST-4502 Implementation Plan

    SciTech Connect

    BROWN, M.J.; LECLAIR, M.D.

    2000-09-27

    Plan has been developed to demonstrate compliance with regulatory requirements set forth in Permit ST-3502 and as a line management tool for use in maintaining configuration control of permit as well as documentation used to implement permit requirements.

  6. Are Urban Stream Restoration Plans Worth Implementing?

    NASA Astrophysics Data System (ADS)

    Sarvilinna, Auri; Lehtoranta, Virpi; Hjerppe, Turo

    2017-01-01

    To manage and conserve ecosystems in a more sustainable way, it is important to identify the importance of the ecosystem services they provide and understand the connection between natural and socio-economic systems. Historically, streams have been an underrated part of the urban environment. Many of them have been straightened and often channelized under pressure of urbanization. However, little knowledge exists concerning the economic value of stream restoration or the value of the improved ecosystem services. We used the contingent valuation method to assess the social acceptability of a policy-level water management plan in the city of Helsinki, Finland, and the values placed on improvements in a set of ecosystem services, accounting for preference uncertainty. According to our study, the action plan would provide high returns on restoration investments, since the benefit-cost ratio was 15-37. Moreover, seventy-two percent of the respondents willing to pay for stream restoration chose "I want to conserve streams as a part of urban nature for future generations" as the most motivating reason. Our study indicates that the water management plan for urban streams in Helsinki has strong public support. If better marketed to the population within the watershed, the future projects could be partly funded by the local residents, making the projects easier to accomplish. The results of this study can be used in planning, management and decision making related to small urban watercourses.

  7. Tank farms justification for continued operations 007 Implementation Plan

    SciTech Connect

    Propson, J.G., Westinghouse Hanford

    1996-08-23

    This Implementation Plan (IP) provides detailed descriptions, cost estimates, and schedules of activities required to implement the controls specified in Flammable Gas/Slurry Growth Unreviewed Safety Question: Justification for Continued Operation for the Tank Farms at Hanford Site (WHC-SD-WM-JCO-007, Rev.0). This IP complies with the Interim Operational Safety Requirements (IOSR) Administrative Control 5.27 and WHC-IP-0842 Volume 4 Section 5.6 for such a plan.

  8. Environmental Protection Implementation Plan, November 9, 1991--November 9, 1992

    SciTech Connect

    Latham, A.R.; Evans, R.B.

    1991-11-01

    DOE Order 5400.1, General Environmental Protection Program,'' established environmental protection program requirements, authorities, and responsibilities to assure that the Department of Energy (DOE) operations are in compliance with applicable federal, state, and local environmental protection laws and regulations, executive orders, and internal department policies. Chapter 3 of DOE Order 5400.1 required that each field organization prepare a plan for implementing the requirements of this order by no later than November 9, 1989, and update the plan annually. Therefore, the Department of Energy/Field Office, Nevada (DOE/NV) has prepared this second annual update of its Environmental Protection Implementation Plan (EPIP). The Order and corresponding guidances also require estimated budgetary resources necessary for implementation of the Order be identified in the Environmental Protection Implementation Plan. To satisfy this requirement, the estimated costs to effectuate necessary changes in existing programs or processes and to institute new programs or processes for compliance with the Order are provided in the following sections of this plan. The DOE/NV Assistant Manager for Operations (AMO), in consultation with other organizations responsible for line management of plan implementation, is responsible for annual plan revisions. 7 figs.

  9. Handbook for Decentralized Education Planning. Implementing National EFA Plans

    ERIC Educational Resources Information Center

    Online Submission, 2005

    2005-01-01

    The Dakar 2000 goal of Education For All (EFA) is at the center of UNESCO's education activities worldwide. The wide-ranging efforts to achieve EFA in many countries involve education reform, development strategies and plans. Decentralization, a major component in modernizing the public sector, is also applicable to the education sector. The…

  10. 40 CFR 49.9956 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... detrimental to public health or welfare. (k) Section 49.137Rule for air pollution episodes. (l) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (m) Section 49... ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes-Region...

  11. 40 CFR 49.10706 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... detrimental to public health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  12. 40 CFR 49.11016 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    .... (k) Section 49.135Rule for emissions detrimental to public health or welfare. (l) Section 49.137Rule for air pollution episodes. (m) Section 49.138Rule for the registration of air pollution sources and... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  13. 40 CFR 49.10406 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (n) Section 49.137Rule for air pollution episodes. (o) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (p) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  14. 40 CFR 49.10556 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  15. 40 CFR 49.10376 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  16. 40 CFR 49.10646 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  17. 40 CFR 49.10986 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  18. 40 CFR 49.10436 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  19. 40 CFR 49.10736 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  20. 40 CFR 49.10586 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  1. 40 CFR 49.10856 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  2. 40 CFR 49.10136 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  3. 40 CFR 49.9986 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting... ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes-Region X...) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section 49.126Rule for...

  4. 40 CFR 49.10496 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... detrimental to public health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  5. 40 CFR 49.10226 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  6. 40 CFR 49.10166 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  7. 40 CFR 49.10196 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  8. 40 CFR 49.9896 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes-Region X... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  9. 40 CFR 49.10016 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  10. 40 CFR 49.11106 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  11. 40 CFR 49.10956 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  12. 40 CFR 49.10926 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  13. 40 CFR 49.10316 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  14. 40 CFR 49.9866 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes-Region...

  15. 40 CFR 49.10346 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  16. 40 CFR 49.10886 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  17. 40 CFR 49.10826 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  18. 40 CFR 49.10256 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  19. 40 CFR 49.10526 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... detrimental to public health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  20. 40 CFR 49.11076 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  1. 40 CFR 49.10046 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  2. 40 CFR 49.10766 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  3. 40 CFR 49.10286 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... detrimental to public health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  4. 40 CFR 49.10106 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ....135Rule for emissions detrimental to public health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  5. 40 CFR 49.10676 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... detrimental to public health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  6. 40 CFR 49.11046 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  7. 40 CFR 49.10466 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  8. 40 CFR 51.851 - State Implementation Plan (SIP) revision.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 2 2010-07-01 2010-07-01 false State Implementation Plan (SIP... Plan (SIP) revision. Link to an amendment published at 75 FR 17272, April 5, 2010. (a) Each State must... to meet the Act requirements until such time as the required conformity SIP revision is approved...

  9. Management Planning Requirements for Implementing Office Automation.

    ERIC Educational Resources Information Center

    McDole, Thomas L.

    To be successful in implementing office automation, office managers must consider more than the obvious question of which system to purchase. They must consider whether automation of their particular office and operations will yield benefits of a significant magnitude to warrant the expense of money, time, and energy needed to install and operate…

  10. 40 CFR 49.10406 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....137Rule for air pollution episodes. (o) Section 49.138Rule for the registration of air pollution sources... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation....133Rule for agricultural burning permits. (l) Section 49.134Rule for forestry and silvicultural...

  11. 40 CFR 49.10646 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  12. 40 CFR 49.10886 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  13. 40 CFR 49.10956 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  14. 40 CFR 49.11106 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  15. 40 CFR 49.10046 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  16. 40 CFR 49.10496 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  17. 40 CFR 49.10856 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  18. 40 CFR 49.10556 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  19. 40 CFR 49.10586 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  20. 40 CFR 49.11076 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  1. 40 CFR 49.10316 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  2. 40 CFR 49.10286 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  3. 40 CFR 49.10736 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  4. 40 CFR 49.10376 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  5. 40 CFR 49.11046 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  6. 40 CFR 49.10196 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  7. 40 CFR 49.10766 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  8. 40 CFR 49.10986 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  9. 40 CFR 49.10826 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  10. 40 CFR 49.10466 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  11. 40 CFR 49.10256 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  12. 40 CFR 49.10016 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation...) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section 49.126Rule for...

  13. 40 CFR 49.10166 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  14. 40 CFR 49.10926 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  15. 40 CFR 49.10436 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  16. 40 CFR 49.10136 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  17. 40 CFR 49.10226 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  18. 40 CFR 49.10346 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  19. 40 CFR 51.1002 - Submittal of State implementation plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    .... 51.1002 Section 51.1002 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Implementation of PM2.5 National Ambient Air Quality Standards § 51.1002 Submittal of State implementation plan. (a) For any area designated by EPA as nonattainment for the PM2.5 NAAQS, the State must submit...

  20. 40 CFR 51.372 - State Implementation Plan submissions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PROGRAMS REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Inspection... Standard in place prior to implementation of the 8-hour ozone standard and including all necessary legal... later than November 15, 1993. For non-attainment areas designated and classified under the 8-hour...

  1. 40 CFR 51.372 - State Implementation Plan submissions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PROGRAMS REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Inspection... Standard in place prior to implementation of the 8-hour ozone standard and including all necessary legal... later than November 15, 1993. For non-attainment areas designated and classified under the 8-hour...

  2. 76 FR 508 - Approval and Promulgation of Implementation Plans; Idaho

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-05

    ...EPA is proposing to approve revisions to the Idaho State Implementation Plan (SIP) that were submitted to EPA by the State of Idaho on April 16, 2007. This SIP submittal includes new and revised rules which provide the Idaho Department of Environmental Quality (IDEQ) the regulatory authority to address regional haze and to implement Best Available Retrofit Technology (BART) requirements. The......

  3. Implementation in Head Start Planned Variation: 1971-72.

    ERIC Educational Resources Information Center

    Lukas, Carol VanDeusen; Wohlleb, Cindy

    This report on model implementation during the third year (1971-72) of the Head Start Planned Variation experiment concentrates on the development of measures of implementation. Measures are examined individually in terms of design and use, strengths and weaknesses, and findings obtained, and agreement among raters on the extent of implementation…

  4. Strategic Planning Implementation in Indonesia’s Transmigration Plan.

    DTIC Science & Technology

    1984-06-01

    suggest that a critical aspect cf top management’s work today involves matching organizational competencies with the opportunities and risks created by...sectors simultaneously, and the government was unable to create a favourable condition as a support means, the plan failed to 46 raise up the eccnomic...conditicn of the Indonesian people. This created a national conflict that caused the successio, cf the President in 1965. Under Socharto’s Leadership

  5. 40 CFR 49.11080 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Implementation Plans for Tribes-Region X Implementation Plan for the Confederated Tribes of the Warm Springs... following regulations are incorporated and made part of the implementation plan for the Warm...

  6. 40 CFR 49.11080 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Implementation Plans for Tribes-Region X Implementation Plan for the Confederated Tribes of the Warm Springs... following regulations are incorporated and made part of the implementation plan for the Warm...

  7. 40 CFR 49.11080 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Implementation Plans for Tribes-Region X Implementation Plan for the Confederated Tribes of the Warm Springs... following regulations are incorporated and made part of the implementation plan for the Warm...

  8. 77 FR 35870 - Approval of Air Quality Implementation Plans; Wisconsin; Partial Disapproval of “Infrastructure...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-15

    ... AGENCY 40 CFR Part 52 Approval of Air Quality Implementation Plans; Wisconsin; Partial Disapproval of ``Infrastructure'' State Implementation Plan AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule...'' State Implementation Plan (SIP). Specifically, we are finalizing the disapproval of portions of...

  9. 40 CFR 49.10170 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Implementation Plans for Tribes-Region X Implementation Plan for the Jamestown S'klallam Tribe of Washington § 49... incorporated and made part of the implementation plan for the Reservation of the Jamestown S'Klallam Tribe:...

  10. 40 CFR 49.10170 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Implementation Plans for Tribes-Region X Implementation Plan for the Jamestown S'klallam Tribe of Washington § 49... incorporated and made part of the implementation plan for the Reservation of the Jamestown S'Klallam Tribe:...

  11. 40 CFR 49.10170 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Implementation Plans for Tribes-Region X Implementation Plan for the Jamestown S'klallam Tribe of Washington § 49... incorporated and made part of the implementation plan for the Reservation of the Jamestown S'Klallam Tribe:...

  12. Achieving succession planning and implementation: one healthcare network's story.

    PubMed

    Capuano, Terry Ann; MacKenzie, Richard

    2013-01-01

    Frequent transitions in leadership can cause inefficiency, inconsistency, and lack of alignment with priorities and strategy. Retaining management talent and collaboratively planning their succession can help ensure organizational survival. Succession planning, in healthcare and other industries, addresses some of these concerns; however, there is a dearth of descriptive articles emphasizing "how to." This article demonstrates one healthcare network's comprehensive system for succession planning and implementation. Leaders looking to plan their human resource processes for organizational sustainability would be able to emulate and adapt practices for their networks.

  13. Implementing Strategic Environmental Assessment of spatial planning tools

    SciTech Connect

    De Montis, Andrea

    2013-07-15

    After more than a decade from the publication of the European Directive 2001/42/CE (Directive) on Strategic Environmental Assessment (SEA), the design and construction of the interested spatial planning instruments has gone through a variety of changes and integrations in European and in world states. This inhomogeneous panorama can be explained with a pattern of institutional structures that have so far affected the implementation of the Directive. The aim of this paper is to investigate the level of implementation of the Directive in Italy by developing a comparative analysis of the quality of integration of SEA within the design of the spatial coordination plan of a set of Italian provinces. Italian practice is analyzed in the framework of a comparative study of worldwide SEA implementation within spatial and land use planning. The results reveal strengths and weaknesses in SEA implementation at the provincial level and, in particular, the emergence of critical areas of research concerning institutional context, public participation, monitoring, and observatory of the spatial transformations. -- Highlights: • This is a comparative analysis of SEA in strategic spatial planning in Italy. • The adhesion of Provinces to the study is remarkable. • SEA implementation and integration into spatial planning is still moderate. • Participation via consultations should be more widespread. • Monitoring and institution of observatories are still in an infancy stage.

  14. CELBAN™: A 10-Year Retrospective Catherine Lewis & Blanche Kingdon

    ERIC Educational Resources Information Center

    Lewis, Catherine; Kingdom, Blanche

    2016-01-01

    This article provides a 10-year review by the test developers of the Canadian English Language Benchmark Assessment for Nurses (CELBAN™). From 2004 to 2014, the development, implementation, national administration, and operations of CELBAN and CELBAN-related products and services were the responsibility of the test developers and team at the…

  15. Implementation plan for Bolivian Mineral Exploration Fund

    USGS Publications Warehouse

    Kirkemo, Harold

    1978-01-01

    Bolivia ranks second among world producers of tin and antimony, and first in bismuth production. Mineral exports in 1975 were valued at $314.2 million, nearly 60 percent of the value of all exports, and petroleum product exports totalled nearly $157 million, or 30 percent of the total. Tin accounted for 58 percent of the total value of metallic mineral exports. The central government derived about 19 percent of its total tax revenues in 1975 from the mining sector. The mining sector consists of the large, medium, and small mining subsectors, a classification established by the government. Individual operations are referred to as large, medium, or small depending upon the subsector into which they are classified. All large mining enterprises are owned and operated by a government corporation, COMIBOL; the medium and small operations are privately owned. COMIBOL's exports in 1975 were valued at $171.8 million or 70 percent of the total mineral exports; the medium mines accounted for $55.5 million or 23 percent, and the small mines for $17.5 million or 7 percent of the total. The combination of high operating costs, low productivity, inadequate ore reserves, and insufficient risk capital for exploration and development has led to the realization that there is an urgent need to improve the situation for mining in Bolivia. Proposals are being studied to revise the tax code, a program is underway to evaluate selected mineral deposits for possible exploration and development, and programs are under consideration to encourage minerals exploration. A minerals exploration plan is proposed which would offer technical and financial aid to various segments in the minerals field. A program, estimated to cost between $2 million and $2.5 million annually, and to be operated by a new agency in the Ministry of Mining and Metallurgy, is outlined.

  16. Update of the Used Fuel Dispositon Campaign Implementation Plan

    SciTech Connect

    McMahon, Kevin A.; Bragg-Sitton, Shannon; Mackinnon, Robert James; Saltzstein, Sylvia J.; Sorenson, Ken B.; Swift, Peter N.; Birkholzer, Jens T.

    2014-10-01

    This Update to the Used Fuel Disposition Campaign Implementation Plan provides summary level detail describing how the Used Fuel Disposition Campaign (UFDC) supports achievement of the overarching mission and objectives of the Department of Energy Office of Nuclear Energy Fuel Cycle Technologies Program, building on work completed in this area since 2009. This implementation plan begins with the assumption of target dates that are set out in the January 2013 DOE Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste (http://energy.gov/downloads/strategy-management-and-disposal-used-nuclearfuel- and-high-level-radioactive-waste). These target dates and goals are summarized in section III. This implementation plan will be maintained as a living document and will be updated as needed in response to available funding and progress in the Used Fuel Disposition Campaign and the Fuel Cycle Technologies Program.

  17. Update of the used fuel disposition Campaign Implementation Plan

    SciTech Connect

    Birkholzer, Jens; MacKinnon, Robert; McMahon, Kevin; Saltzstein, Sylvia; Sorenson, Ken; Swift, Peter

    2014-09-01

    This Campaign Implementation Plan provides summary level detail describing how the Used Fuel Disposition Campaign (UFDC) supports achievement of the overarching mission and objectives of the Department of Energy Office of Nuclear Energy Fuel Cycle Technologies Program The implementation plan begins with the assumption of target dates that are set out in the January 2013 DOE Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste (http://energy.gov/downloads/strategy-management-and-disposal-used-nuclear-fuel-and-high-level-radioactive-waste). These target dates and goals are summarized in section III. This implementation plan will be maintained as a living document and will be updated as needed in response to progress in the Used Fuel Disposition Campaign and the Fuel Cycle Technologies Program.

  18. High performance computing and communications: FY 1996 implementation plan

    SciTech Connect

    1995-05-16

    The High Performance Computing and Communications (HPCC) Program was formally authorized by passage of the High Performance Computing Act of 1991, signed on December 9, 1991. Twelve federal agencies, in collaboration with scientists and managers from US industry, universities, and research laboratories, have developed the Program to meet the challenges of advancing computing and associated communications technologies and practices. This plan provides a detailed description of the agencies` HPCC implementation plans for FY 1995 and FY 1996. This Implementation Plan contains three additional sections. Section 3 provides an overview of the HPCC Program definition and organization. Section 4 contains a breakdown of the five major components of the HPCC Program, with an emphasis on the overall directions and milestones planned for each one. Section 5 provides a detailed look at HPCC Program activities within each agency.

  19. Planning, implementing, and using a virtual reference service.

    PubMed

    MacDonald, Marlyse H

    2003-01-01

    Virtual reference (VR) can be a successful vehicle for libraries if there is a demonstrated need by the user base for such a service and if the library staff believes in, accepts, and plans thoroughly for the concept. This article focuses on the experiences of the Duke University Medical Center Library (DUMCL) in planning, implementing, and using a virtual reference service utilizing LSSI's Virtual Reference Desk (VRD) Software.

  20. Development and implementation of an interdisciplinary plan of care.

    PubMed

    Lewis, Cynthia; Hoffmann, Mary Lou; Gard, Angela; Coons, Jacqueline; Bichinich, Pat; Euclid, Jeff

    2005-01-01

    In January 2002 Aurora Health Care Metro Region chartered an interdisciplinary team to develop a process and structure for patient-centered interdisciplinary care planning. This unique endeavor created a process that includes the patient, family, and all clinical disciplines involved in planning and providing care to patients from system point of entry throughout the entire acute care episode. The interdisciplinary plan of care (IPOC) demonstrates the integration of prioritized problems, outcomes, and measurement toward goal attainment. This article focuses on the journey of this team to the successful implementation of an IPOC.

  1. 77 FR 63228 - Approval and Promulgation of Air Quality Implementation Plans; Connecticut, Maine, Massachusetts...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-16

    ... Implementation Plans; Connecticut, Maine, Massachusetts, New Hampshire; Infrastructure SIPs for the 1997 and 2006... State Implementation Plan (SIP) meets the requirements of section 110(a) of the Clean Air Act (CAA) for... plans called state implementation plans (SIPs) that provide for the implementation, maintenance...

  2. 40 CFR 51.390 - Implementation plan revision.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Section 51.390 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... U.S.C. or the Federal Transit Laws § 51.390 Implementation plan revision. (a) Purpose and... the requirements of Clean Air Act section 176(c) until such time as EPA approves the...

  3. 40 CFR 51.390 - Implementation plan revision.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Section 51.390 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... U.S.C. or the Federal Transit Laws § 51.390 Implementation plan revision. (a) Purpose and... the requirements of Clean Air Act section 176(c) until such time as EPA approves the...

  4. The Common Core: Are State Implementation Plans Enough?

    ERIC Educational Resources Information Center

    Best, Jane; Cohen, Courtney

    2013-01-01

    This policy brief outlines the Common Core implementation plans for 15 states, including the professional development and resources/tools--such as instructional materials, toolkits, frameworks, crosswalks, and curriculum guides--that each state is providing. The authors suggest that supplemental resources like McREL's Common Core…

  5. Planning for Transition: An Implementation Guide for Administrators and Teachers.

    ERIC Educational Resources Information Center

    Kelker, Katharin; And Others

    This implementation guide, based on the MESH model (Montana Model for Education of the Severely Handicapped), is intended to assist administrators and teachers in planning for the transition of special education students from one placement to another, with emphasis on preparation for community living and independent functioning. The 11 modules…

  6. 40 CFR 49.11016 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Section 49.135Rule for emissions detrimental to public health or welfare. (l) Section 49.137Rule for air pollution episodes. (m) Section 49.138Rule for the registration of air pollution sources and the reporting... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X...

  7. 40 CFR 49.10706 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V operating permits... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X...

  8. The Empowerment Dynamic: Planning and Implementing a Support Group Network.

    ERIC Educational Resources Information Center

    Stephens, Robin; Haley, Pat

    This handbook describes how to plan and implement a support group for disabled youth in transition from school to work. It was developed from the experiences of a 3-year model program entitled Employability Support Network of Disabled Youth (ESN) which used support groups to accomplish its primary goal of creating "employability readiness" for…

  9. 28 CFR 90.23 - State implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 90.23 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) VIOLENCE AGAINST WOMEN The STOP (Services ⢠Training ⢠Officers ⢠Prosecutors) Violence Against Women Formula Grant Program § 90.23 State... purposes of the Violence Against Women Act. (b) The implementation plan should describe how the State,...

  10. 28 CFR 90.23 - State implementation plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 90.23 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) VIOLENCE AGAINST WOMEN The STOP (Services ⢠Training ⢠Officers ⢠Prosecutors) Violence Against Women Formula Grant Program § 90.23 State... purposes of the Violence Against Women Act. (b) The implementation plan should describe how the State,...

  11. 28 CFR 90.23 - State implementation plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 90.23 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) VIOLENCE AGAINST WOMEN The STOP (Services ⢠Training ⢠Officers ⢠Prosecutors) Violence Against Women Formula Grant Program § 90.23 State... purposes of the Violence Against Women Act. (b) The implementation plan should describe how the State,...

  12. 28 CFR 90.23 - State implementation plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 90.23 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) VIOLENCE AGAINST WOMEN The STOP (Services ⢠Training ⢠Officers ⢠Prosecutors) Violence Against Women Formula Grant Program § 90.23 State... purposes of the Violence Against Women Act. (b) The implementation plan should describe how the State,...

  13. TTIP: Texas Teacher Internship Program 1994 Curriculum Implementation Plans.

    ERIC Educational Resources Information Center

    Walenta, Brian T., Ed.

    The Texas Teacher Internship Program (TTIP) is a competitive program for science, technology and mathematics teachers who serve as summer interns at industry and university sites in order to experience real world applications of the subjects they teach. This document contains curriculum implementation plans developed by the teachers to illustrate…

  14. 40 CFR 49.10106 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... detrimental to public health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X...

  15. 40 CFR 49.10676 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X...

  16. 40 CFR 49.10526 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X...

  17. Current Strategic Business Plan for the Implementation of Digital Systems.

    ERIC Educational Resources Information Center

    Library of Congress, Washington, DC. National Library Service for the Blind and Physically Handicapped.

    This document presents a current strategic business plan for the implementation of digital systems and services for the free national library program operated by the National Library Service for the Blind and Physically Handicapped, Library of Congress, its network of cooperating regional and local libraries, and the United States Postal Service.…

  18. Guide of Ideas for Planning and Implementing Intergenerational Projects

    ERIC Educational Resources Information Center

    Pinto, Teresa Almeida; Marreel, Iris; Hatton-Yeo, Alan

    2009-01-01

    "Guide of Ideas for Planning and Implementing Intergenerational Projects," is for all professionals that are or wish to be enrolled in the development of intergenerational activities. This "Guide" is the main product of the Project MATES--Mainstreaming Intergenerational Solidarity, co-financed by the Lifelong Learning…

  19. 75 FR 45080 - Revisions to the California State Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-02

    ... Implementation Plan (SIP). These revisions concern oxides of nitrogen (NO X ) emissions from boilers, steam... Boilers, Steam Generators 12/17/09 05/17/10 and Process Heaters-- 0.75 to less than 2.0 MMbtu/hr. On June... from boilers, steam generators, process heaters and water heaters with a total rated heat input...

  20. 45 CFR 162.412 - Implementation specifications: Health plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 1 2012-10-01 2012-10-01 false Implementation specifications: Health plans. 162.412 Section 162.412 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES ADMINISTRATIVE DATA STANDARDS AND RELATED REQUIREMENTS ADMINISTRATIVE REQUIREMENTS Standard Unique Health Identifier for...

  1. 45 CFR 162.412 - Implementation specifications: Health plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 1 2014-10-01 2014-10-01 false Implementation specifications: Health plans. 162.412 Section 162.412 Public Welfare Department of Health and Human Services ADMINISTRATIVE DATA STANDARDS AND RELATED REQUIREMENTS ADMINISTRATIVE REQUIREMENTS Standard Unique Health Identifier for...

  2. 45 CFR 162.512 - Implementation specifications: Health plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 1 2013-10-01 2013-10-01 false Implementation specifications: Health plans. 162.512 Section 162.512 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES ADMINISTRATIVE DATA STANDARDS AND RELATED REQUIREMENTS ADMINISTRATIVE REQUIREMENTS Standard Unique Health Identifier for...

  3. 45 CFR 162.412 - Implementation specifications: Health plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 1 2013-10-01 2013-10-01 false Implementation specifications: Health plans. 162.412 Section 162.412 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES ADMINISTRATIVE DATA STANDARDS AND RELATED REQUIREMENTS ADMINISTRATIVE REQUIREMENTS Standard Unique Health Identifier for...

  4. 45 CFR 162.412 - Implementation specifications: Health plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 1 2011-10-01 2011-10-01 false Implementation specifications: Health plans. 162.412 Section 162.412 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES ADMINISTRATIVE DATA STANDARDS AND RELATED REQUIREMENTS ADMINISTRATIVE REQUIREMENTS Standard Unique Health Identifier for...

  5. 45 CFR 162.512 - Implementation specifications: Health plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 1 2014-10-01 2014-10-01 false Implementation specifications: Health plans. 162.512 Section 162.512 Public Welfare Department of Health and Human Services ADMINISTRATIVE DATA STANDARDS AND RELATED REQUIREMENTS ADMINISTRATIVE REQUIREMENTS Standard Unique Health Identifier for...

  6. 45 CFR 162.512 - Implementation specifications: Health plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 1 2012-10-01 2012-10-01 false Implementation specifications: Health plans. 162.512 Section 162.512 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES ADMINISTRATIVE DATA STANDARDS AND RELATED REQUIREMENTS ADMINISTRATIVE REQUIREMENTS Standard Unique Health Identifier for...

  7. 45 CFR 162.412 - Implementation specifications: Health plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Implementation specifications: Health plans. 162.412 Section 162.412 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES ADMINISTRATIVE DATA STANDARDS AND RELATED REQUIREMENTS ADMINISTRATIVE REQUIREMENTS Standard Unique Health Identifier for...

  8. Planning for Implementation of Section 504 at Colleges and Universities.

    ERIC Educational Resources Information Center

    Mistler, Sharon

    Included in the discussion of how colleges and universities can plan for the implementation of Section 504 of the 1973 Rehabilitation Act (which gives handicapped people equal access to higher education) are an explanation of Subpart E of the Act, a definition of the handicapped community, and a list of services that should be provided for them on…

  9. TTIP: Texas Teacher Internship Program: 1995 Curriculum Implementation Plans.

    ERIC Educational Resources Information Center

    Walenta, Brian T., Ed.

    In 1989 the Texas Alliance for Science, Technology and Mathematics Education began placing teachers of all levels at industry sites as part of its Texas Teacher Internship Program. In 1995, 15 teachers interned at 11 sites. Each teacher was required to develop a curriculum implementation plan which was to illustrate how they would translate the…

  10. 28 CFR 90.23 - State implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 90.23 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) VIOLENCE AGAINST WOMEN The STOP (Services ⢠Training ⢠Officers ⢠Prosecutors) Violence Against Women Formula Grant Program § 90.23 State... purposes of the Violence Against Women Act. (b) The implementation plan should describe how the State,...

  11. 49 CFR 37.143 - Paratransit plan implementation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Paratransit plan implementation. 37.143 Section 37.143 Transportation Office of the Secretary of Transportation TRANSPORTATION SERVICES FOR INDIVIDUALS WITH DISABILITIES (ADA) Paratransit as a Complement to Fixed Route Service § 37.143 Paratransit...

  12. 2016-2020 Strategic Plan and Implementing Framework

    SciTech Connect

    2015-11-01

    The 2016-2020 Strategic Plan and Implementing Framework from the Office of Energy Efficiency and Renewable Energy (EERE) is the blueprint for launching the nation’s leadership in the global clean energy economy. This document will guide the organization to build on decades of progress in powering our nation from clean, affordable and secure energy.

  13. Institute for Superintendents, Planning and Implementing Programs in Vocational Education.

    ERIC Educational Resources Information Center

    Georgia Univ., Athens. Coll. of Education.

    A 3-day institute was held to assist 30 school superintendents in acquiring information and an understanding essential for planning, implementing, and administering more adequate vocational education programs in their schools. Major presentations were: (1) "The Role and Responsibility of the Superintendent for Vocational Education" by J.W. Letson,…

  14. High performance computing and communications: FY 1995 implementation plan

    SciTech Connect

    1994-04-01

    The High Performance Computing and Communications (HPCC) Program was formally established following passage of the High Performance Computing Act of 1991 signed on December 9, 1991. Ten federal agencies in collaboration with scientists and managers from US industry, universities, and laboratories have developed the HPCC Program to meet the challenges of advancing computing and associated communications technologies and practices. This plan provides a detailed description of the agencies` HPCC implementation plans for FY 1994 and FY 1995. This Implementation Plan contains three additional sections. Section 3 provides an overview of the HPCC Program definition and organization. Section 4 contains a breakdown of the five major components of the HPCC Program, with an emphasis on the overall directions and milestones planned for each one. Section 5 provides a detailed look at HPCC Program activities within each agency. Although the Department of Education is an official HPCC agency, its current funding and reporting of crosscut activities goes through the Committee on Education and Health Resources, not the HPCC Program. For this reason the Implementation Plan covers nine HPCC agencies.

  15. The GLOBE Program 10 Years On: Challenges and Opportunities

    NASA Astrophysics Data System (ADS)

    Blurton, C.

    2004-12-01

    ). This session will examine what was accomplished during GLOBE's first 10 years as a Federal program, what challenges the Program faces, and what plans are afoot for GLOBE's next ten years under UCAR's leadership.

  16. [10 years of liver transplantation in Peru].

    PubMed

    Chaman Ortiz, José Carlos; Padilla Machaca, P Martín; Rondon Leyva, Carlos; Carrasco Mascaró, Felix

    2010-01-01

    The article reviews the experience in 10 years of hepatic transplants performed by The Transplant Department of the National Hospital Guillermo Almenara Irigoyen (HNGAI), describing the history, surgical outcomes in adults and children, retransplantation, combined liver-kidney transplants, complications in 72 transplants performed at the time of submission of the article.

  17. YOUNG WOMEN IN VIRGINIA, A 10-YEAR FOLLOW-UP STUDY OF GIRLS ENROLLED IN 1954-55 IN THE TENTH GRADE IN VIRGINIA HIGH SCHOOLS. A RESEARCH CONTRIBUTION TO EDUCATIONAL PLANNING, VOL. 49, NO. 1.

    ERIC Educational Resources Information Center

    JORDAN, BETH C.; LOVING, ROSA H.

    THE PURPOSES OF THIS STUDY WERE TO DETERMINE THE NEEDS FOR STRENGTHENING THE HOMEMAKING PROGRAM AND FOR PLANNING PROGRAMS TO PREPARE YOUNG WOMEN FOR OCCUPATIONS USING HOME ECONOMICS SKILLS AND KNOWLEDGE. HOME ECONOMICS TEACHERS COMPLETED DATA SHEETS FOR 2,679 OF THE 20,000 10TH GRADE GIRLS IN VIRGINIA SCHOOLS IN 1954-55. QUESTIONNAIRES WERE SENT…

  18. The Best Laid Plans: An Examination of School Plan Quality and Implementation in a School Improvement Initiative

    ERIC Educational Resources Information Center

    Strunk, Katharine O.; Marsh, Julie A.; Bush-Mecenas, Susan C.; Duque, Matthew R.

    2016-01-01

    Purpose: A common strategy used in school improvement efforts is a mandated process of formal planning, yet little is known about the quality of plans or the relationship between plan quality and implementation. This mixed-methods article investigates plan quality, factors associated with plan quality, and the relationship between plan quality and…

  19. Developing of 10-year EEZ seafloor mapping and research program

    USGS Publications Warehouse

    Lockwood, M.; Hill, G.W.

    1988-01-01

    The intent of expanding the exploration already begun on the outer continental shelf to the frontier of the EEZ (Exclusive Economic Zone) is to determine the "characteristics' and resource potential of this region. To coordinate this exploration, a Joint Office for Mapping and Research (JOMAR) has been established by the US Geological Survey (in the Department of the Interior) and the National Oceanic and Atmospheric Administration (in the Department of Commerce). JOMAR's main purpose is to help direct and coordinate ongoing and planned seafloor related activities in the EEZ and prepare a 10-year plan for mapping and research. -from Authors

  20. Oil program implementation plan FY 1996--2000

    SciTech Connect

    1995-04-01

    This document reaffirms the US Department of Energy (DOE) Office of Fossil Energy commitment to implement the National Oil Research Program in a way to maximize assurance of energy security, economic growth, environmental protection, jobs, improved economic competitiveness, and improved US balance of trade. There are two sections and an appendix in this document. Section 1 is background information that guided its formulation and a summary of the Oil Program Implementation Plan. This summary includes mission statements, major program drivers, oil issues and trends, budget issues, customers/stakeholders, technology transfer, measures of program effectiveness, and benefits. Section 2 contains more detailed program descriptions for the eight technical areas and the NIPER infrastructure. The eight technical areas are reservoir characterization; extraction research; exploration, drilling, and risk-based decision management; analysis and planning; technology transfer; field demonstration projects; oil downstream operations; and environmental research. Each description contains an overview of the program, descriptions on main areas, a discussion of stakeholders, impacts, planned budget projections, projected schedules with Gantt charts, and measures of effectiveness. The appendix is a summary of comments from industry on an earlier draft of the plan. Although changes were made in response to the comments, many of the suggestions will be used as guidance for the FY 1997--2001 plan.

  1. AMS at ANTARES - The first 10 years

    NASA Astrophysics Data System (ADS)

    Lawson, E. M.; Elliott, G.; Fallon, J.; Fink, D.; Hotchkis, M. A. C.; Hua, Q.; Jacobsen, G. E.; Lee, P.; Smith, A. M.; Tuniz, C.; Zoppi, U.

    2000-10-01

    The status and capabilities of the ANTARES AMS facility after 10 years are reviewed. The common AMS radioisotopes, 10Be, 14C, 26Al, 36Cl and 129I, are routinely analysed. A capability for the detection of 236U and other actinide isotopes has been developed. The measurement program includes support to Quaternary science projects at Australian universities and to ANSTO projects in global climate change and nuclear safeguards.

  2. Neurology--the next 10 years.

    PubMed

    Baron, Ralf; Ferriero, Donna M; Frisoni, Giovanni B; Bettegowda, Chetan; Gokaslan, Ziya L; Kessler, John A; Vezzani, Annamaria; Waxman, Stephen G; Jarius, Sven; Wildemann, Brigitte; Weller, Michael

    2015-11-01

    Since the launch of our journal as Nature Clinical Practice Neurology in 2005, we have seen remarkable progress in many areas of neurology research, but what does the future hold? Will advances in basic research be translated into effective disease-modifying therapies, and will personalized medicine finally become a reality? For this special Viewpoint article, we invited a panel of Advisory Board members and other journal contributors to outline their research priorities and predictions in neurology for the next 10 years.

  3. Top Down Implementation Plan for system performance test software

    NASA Technical Reports Server (NTRS)

    Jacobson, G. N.; Spinak, A.

    1982-01-01

    The top down implementation plan used for the development of system performance test software during the Mark IV-A era is described. The plan is based upon the identification of the hierarchical relationship of the individual elements of the software design, the development of a sequence of functionally oriented demonstrable steps, the allocation of subroutines to the specific step where they are first required, and objective status reporting. The results are: determination of milestones, improved managerial visibility, better project control, and a successful software development.

  4. Standard Review Plan Maintenance Program implementing procedures document

    SciTech Connect

    1996-11-01

    The implementing Procedures Document (IPD) was developed by the Inspection Program Projects Branch, Office of Nuclear Reactor Regulation, with assistance from Pacific Northwest National Laboratory, for the Standard Review Plan Maintenance Program (SRP-MP). The SRP-MP was established to maintain the Standard Review Plan (SRP) on an on-going basis. The IPD provides guidance, including an overall approach and procedures, for SRP-MP tasks. The objective of the IPD is to ensure that modifications to SRP need to reflect current NRC requirements and guidance are identified and that a consistent methodology is used to develop and revise SRP sections.

  5. 76 FR 52387 - Approval and Promulgation of Implementation Plans; New Mexico; Federal Implementation Plan for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-22

    ... plant. The federal plan will require the San Juan Generating Station to cut emissions to improve scenic... improve consistency, cost estimates should be based on the OAQPS Control Cost Manual, [now renamed ``EPA... improve visibility. The NPS goes on to provide several examples of $/ deciview calculations. Two...

  6. 75 FR 56923 - Approval and Promulgation of Implementation Plans; Oklahoma; State Implementation Plan Revisions...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-17

    ... otherwise modify redundant or incorrect language within the OAC. The variety of revisions includes..., particulate matter, and sulfur dioxide. The plan developed by a State is referred to as the State... 1997 8-hour ozone NAAQS (70 FR 71612), the State submitted a SIP revision on June 24, 2010, to...

  7. Standard Review Plan Update and Development Program. Implementing Procedures Document

    SciTech Connect

    Not Available

    1992-05-01

    This implementing procedures document (IPD) was prepared for use in implementing tasks under the standard review plan update and development program (SRP-UDP). The IPD provides comprehensive guidance and detailed procedures for SRP-UDP tasks. The IPD is mandatory for contractors performing work for the SRP-UDP. It is guidance for the staff. At the completion of the SRP-UDP, the IPD will be revised (to remove the UDP aspects) and will replace NRR Office Letter No. 800 as long-term maintenance procedures.

  8. Toward an Evaluation Framework for Doctoral Education in Social Work: A 10-Year Retrospective of One PhD Program's Assessment Experiences

    ERIC Educational Resources Information Center

    Bentley, Kia J.

    2013-01-01

    This article presents a framework for evaluation in social work doctoral education and details 10 years of successes and challenges in one PhD program's use of the framework, including planning and implementing specific assessment activities around student learning outcomes and larger program goals. The article argues that a range of…

  9. Implementing a survivorship care plan for patients with breast cancer.

    PubMed

    Miller, Rita

    2008-06-01

    The growing number of cancer survivors challenges healthcare organizations to develop programs that support survivors' transition from active treatments to survivorship care. Many individuals and families continue to face complicated care issues resulting from cancer diagnosis and side effects long after completion of their treatments. This article describes a model of a survivorship care plan, Cancer Treatment Summary and Follow-Up Care Plan, piloted in an outpatient clinical setting in a community hospital for patients with breast cancer. The plan can be expanded to include other cancer types. The intent of the survivorship care plan is to strengthen the care connections and coordination of services for survivors of breast cancer to ensure that continuing care needs are met during the survivorship phase of the cancer trajectory. The survivorship care plan is a unique opportunity for oncology nurses to be catalysts for the interdisciplinary interactions that are required to develop survivorship care plans and to implement a change in oncology nursing practice. The intervention shifts the paradigm of cancer survivorship care from an acute care medical model to a wellness model for cancer survivors in the clinical setting.

  10. 77 FR 70689 - Approval and Promulgation of Implementation Plans; Tennessee; Regional Haze State Implementation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-27

    ... Implementation Plan; Best Available Retrofit Technology Requirements for Eastman Chemical Company AGENCY... Available Retrofit Technology (BART) requirements for the Eastman Chemical Company (Eastman) that were.... The May 14, 2012, SIP revision (as clarified in a May 25, 2012, SIP revision) changed the...

  11. Prepositioned Stocks: DOD’s Strategic Policy and Implementation Plan

    DTIC Science & Technology

    2014-06-24

    GAO-14-659R Prepositioned Stocks 441 G St. N.W. Washington, DC 20548 June 24, 2014 Congressional Committees Prepositioned Stocks ...00-00-2014 to 00-00-2014 4. TITLE AND SUBTITLE Prepositioned Stocks : DOD’s Strategic Policy and Implementation Plan 5a. CONTRACT NUMBER 5b...unclassified c. THIS PAGE unclassified Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18 Page 2 GAO-14-659R Prepositioned Stocks obtained

  12. 25 Point Implementation Plan to Reform Federal information Technology Management

    DTIC Science & Technology

    2010-12-09

    25 POINT IMPLEMENTATION PLAN TO REFORM FEDERAL INFORMATION TECHNOLOGY MANAGEMENT Vivek Kundra U.S. Chief Information Officer DECEMBER 9, 2 010... information Technology Management 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f...RefoRm fedeRal infoRmaTion TeChnology managemenT ii★ ★ C2 . Align the Budget Process with the Technology Cycle

  13. Implementation of Planned Change: A Review of Major Issues.

    DTIC Science & Technology

    1983-02-01

    olo .ltme.ewa #EROOF br U0ee rnbee) Change Implementation Planned change Managerial strategies Technological change Resistance Innovation I. AU..ACT r...organizational structure (e.g., technology ) or process (e.g., control systems). Change involving inter- and/or intrapersonal characteristics (e.g., change...19741 Abrams, Sheposh, Cohen, & Young, 1977). This work was prompted by documented misuse and nonuse of technological systems, in some cases years

  14. Use Dose Bricks Concept to Implement Nasopharyngeal Carcinoma Treatment Planning

    PubMed Central

    Wu, Jia-Ming; Yu, Tsan-Jung; Yeh, Shyh-An; Chao, Pei-Ju; Huang, Chih-Jou

    2014-01-01

    Purpose. A “dose bricks” concept has been used to implement nasopharyngeal carcinoma treatment plan; this method specializes particularly in the case with bell shape nasopharyngeal carcinoma case. Materials and Methods. Five noncoplanar fields were used to accomplish the dose bricks technique treatment plan. These five fields include (a) right superior anterior oblique (RSAO), (b) left superior anterior oblique (LSAO), (c) right anterior oblique (RAO), (d) left anterior oblique (LAO), and (e) superior inferior vertex (SIV). Nondivergence collimator central axis planes were used to create different abutting field edge while normal organs were blocked by multileaf collimators in this technique. Results. The resulting 92% isodose curves encompassed the CTV, while maximum dose was about 115%. Approximately 50% volume of parotid glands obtained 10–15% of total dose and 50% volume of brain obtained less than 20% of total dose. Spinal cord receives only 5% from the scatter dose. Conclusions. Compared with IMRT, the expenditure of planning time and costing, “dose bricks” may after all be accepted as an optional implementation in nasopharyngeal carcinoma conformal treatment plan; furthermore, this method also fits the need of other nonhead and neck lesions if organ sparing and noncoplanar technique can be executed. PMID:24967395

  15. 77 FR 12651 - Approval of Air Quality Implementation Plans; California; San Joaquin Valley; Attainment Plan for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-01

    ...EPA is approving state implementation plan (SIP) revisions submitted by California to provide for attainment of the 1997 8-hour ozone national ambient air quality standards in the San Joaquin Valley (SJV). These SIP revisions are the 2007 Ozone Plan (revised 2008 and 2011) and SJV-related portions of the 2007 State Strategy (revised 2009 and 2011). EPA is approving the base year emissions......

  16. 10-year survival of total ankle arthroplasties

    PubMed Central

    2011-01-01

    Background and purpose There is an ongoing need to review large series of total ankle replacements (TARs) for monitoring of changes in practice and their outcome. 4 national registries, including the Swedish Ankle Register, have previously reported their 5-year results. We now present an extended series with a longer follow-up, and with a 10-year survival analysis. Patients and methods Records of uncemented 3-component TARs were retrospectively reviewed, determining risk factors such as age, sex, and diagnosis. Prosthetic survival rates were calculated with exchange or removal of components as endpoint—excluding incidental exchange of the polyethylene meniscus. Results Of the 780 prostheses implanted since 1993, 168 (22%) had been revised by June 15, 2010. The overall survival rate fell from 0.81 (95% CI: 0.79–0.83) at 5 years to 0.69 (95% CI: 0.67–0.71) at 10 years. The survival rate was higher, although not statistically significantly so, during the latter part of the period investigated. Excluding the STAR prosthesis, the survival rate for all the remaining designs was 0.78 at 10 years. Women below the age of 60 with osteoarthritis were at a higher risk of revision, but age did not influence the outcome in men or women with rheumatoid arthritis. Revisions due to technical mistakes at the index surgery and instability were undertaken earlier than revisions for other reasons. Interpretation The results have slowly improved during the 18-year period investigated. However, we do not believe that the survival rates of ankle replacements in the near future will approach those of hip and knee replacements—even though improved instrumentation and design of the prostheses, together with better patient selection, will presumably give better results. PMID:22066551

  17. Mitochondrial ROS Metabolism: 10 Years Later

    PubMed Central

    Kushnareva, Y. E.; Murphy, A. N.

    2015-01-01

    The role of mitochondria in oxidative stress is well recognized, but many questions are still to be answered. This article is intended to update our comprehensive review in 2005 by highlighting the progress in understanding of mitochondrial reactive oxygen species (ROS) metabolism over the past 10 years. We review the recently identified or re-appraised sources of ROS generation in mitochondria, such as p66shc protein, succinate dehydrogenase, and recently discovered properties of the mitochondrial antioxidant system. We also reflect upon some controversies, disputes, and misconceptions that confound the field. PMID:26071769

  18. 10 years after implementation of TRIPS obligations in India.

    PubMed

    Pawar, Mahesh D

    2015-01-01

    The Patent (Amendment) Act of 2005 enforced after TRIPS raises many issues which hinder growth of Indian pharma companies. To tackle this, Indian pharma companies doubled their R&D expenditure and became significant players in global generic drug market. Indian pharmaceutical companies, which predominantly focused on import-oriented market, shifted to research-based approach by signing various agreements with MNCs that led to M&A and technology transfer. At the same time growth in R&D activities increased ANDA and DMF filing in the USA and Europe. Companies also kept their social responsibility by selling medicines at affordable price to patients. This paper highlights the changing business scenario of Indian pharmaceutical companies to counteract various issues evolved from new patent regime after TRIPS.

  19. Children's hospitals and PACS: six profiles of planning and implementation.

    PubMed

    Keen, C

    1999-01-01

    Six pediatric hospitals were interviewed at length about the status of PACS in their facilities. Children's Hospital Medical Center in Cincinnati, Ohio entered electronic imaging communications in 1993. Several nearby clinics were connected through teleradiology and by 1998, the radiology department had developed a business plan for the implementation of PACS. Two hospitals in Atlanta, Egleston Hospital and Scottish Rite Children's. Medical Center, merged in 1998 to become one entity with two medical campuses. They now treat 60 percent of Atlanta's pediatric patients. Merging incompatible systems has been the administrator's most immediate problem. One director of imaging services is responsible for the recently merged Mary Bridge Children's Hospital and Tacoma General Hospital, plus a network of clinics and medical facilities scatted throughout Tacoma and the South Puget Sound area in Washington state. A state-of-the-art mini-PACS and teleradiology system were implemented at Primary Children's Medical Center, Salt Lake City, in 1991. Over the years, it has added modalities into an electronic system that now results in significantly improved use of physicians' time and patient relations. St. Louis Children's Hospital, with both a director of radiology and a PACS administrator, has implemented teleradiology and an ultrasound mini-PACS, and has plans for an enterprise-wide PACS. Children's Hospital in Birmingham, Ala., a major trauma center, provides specialized pediatric care to nearly all 67 counties in Alabama. With a 20-year history of online computerization, it is now reengineering its emergency department and will implement CR there first.

  20. Westinghouse Hanford Company quality assurance program and implementation plan

    SciTech Connect

    Moss, S.S., Westinghouse Hanford

    1996-07-01

    This is the first revision of the Quality AssurancePlan/Implementation Plan (QAP/IP) for nuclear facilities managedand operated by the Westinghouse Hanford Company (WHC).Development of the initial IP required review of the WHC qualityassurance program to the requirements of the 10 CFR 830.120, andcompletion of initial baseline assessments against the QAP toverify implementation of the program. Each WHC-managed nuclearfacility provided a stand-alone section to the QAP/IP, describingits mission and life-cycle status. WHC support organizationsalso performed assessments for their lead areas, and providedinputs to a separate stand-alone section with the initialbaseline assessment results. In this first revision, the initialbaseline matrixes for those facilities found to be in compliancewith the QAP have been removed. Tank Waste Remediation System(TWRS) and K Basins have modified their baseline matrixes to showcompletion of action items to date. With the followingexceptions, the WHC-managed nuclear facilities and their supportorganizations were found to have implemented QA programs thatsatisfy the requirements of 10 CFR 830.120. TWRS identifiedImplementation Plan Action Items having to do with: generationand revision of as-built drawings; updating TWRS organizationaland program documents; tracking the condition/age ofmaterials/equipment; and reconstitution of design bases forexisting, active facilities. No incremental funding needs wereidentified for FY95. For FY97, TWRS identified incrementalfunding in the amount of $65,000 for as-built drawings, and$100,000 for tracking the age/condition of materials/equipment.The K Basin Fuel Storage Facility identified Implementation PlanAction Items having to do with: training; updating procedures;establishing configuration management; reconstituting designbases; and providing darwings; and developing integrated,resource-loaded schedules. Incremental funding needs in theamount of $1.7 million were identified, over a time

  1. Optogenetics: 10 years of microbial opsins in neuroscience

    PubMed Central

    Deisseroth, Karl

    2016-01-01

    Over the past 10 years, the development and convergence of microbial opsin engineering, modular genetic methods for cell-type targeting and optical strategies for guiding light through tissue have enabled versatile optical control of defined cells in living systems, defining modern optogenetics. Despite widespread recognition of the importance of spatiotemporally precise causal control over cellular signaling, for nearly the first half (2005–2009) of this 10-year period, as optogenetics was being created, there were difficulties in implementation, few publications and limited biological findings. In contrast, the ensuing years have witnessed a substantial acceleration in the application domain, with the publication of thousands of discoveries and insights into the function of nervous systems and beyond. This Historical Commentary reflects on the scientific landscape of this decade-long transition. PMID:26308982

  2. 77 FR 46008 - Approval and Promulgation of State Implementation Plans: Idaho; Boise-Northern Ada County Air...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-02

    ... Air Quality Maintenance Area; Second 10-Year Carbon Monoxide Maintenance Plan AGENCY: Environmental... Environmental Quality (IDEQ) submitted the Northern Ada County Air Quality Maintenance Area Second 10-year Carbon Monoxide Maintenance Plan on February 10, 2011. In accordance with the requirements of the...

  3. Self-assessment program implementation plan. Revision A

    SciTech Connect

    Quets, A.L.

    1991-10-23

    This implementation plan identifies and describes the tasks that must be completed in order to successfully implement a Self-Assessment (SA) Program. The purpose of the Self-Assessment Program is to comply with applicable Department of Energy (DOE) directives and orders, Federal, State, and local regulations, operate the Pinellas Plant according to best management practices, and achieve excellence in all operating areas. The Self-Assessment Program will be applied to the Pinellas Plant facility which includes buildings, grounds, equipment, operations, and activities under the control of line management. Furthermore, all applicable disciplines under environmental protection, safety, health and management will be covered by the program. The Self-Assessment Program has been designed to accomplish the following tasks: define the scope of the Self-Assessment Program; assign organizational roles and responsibilities; address EH and S functional elements and management issues; develop a Self-Assessment program charter and policy; identify all applicable EH and S codes, regulations and standards; develop self-assessment procedures and instructions; generate a Self-Assessment Manual; develop a master schedule for facility appraisals and audits; design checklists and report formats for recording appraisal data; implement an assessment tracking and reporting system; implement a root cause analysis and corrective action system; implement a trend analysis and lessons learned system; and establish a formal training program.

  4. 77 FR 65151 - Finding of Substantial Inadequacy of Implementation Plan; Call for California State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-25

    ... to find that the California State Implementation Plan (SIP) for the Los Angeles-South Coast Air Basin... the Clean Air Act, EPA proposed to find that the California State Implementation Plan (SIP) for...

  5. 40 CFR 49.10050 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Implementation Plans for Tribes-Region X Implementation Plan for the Cow Creek Band of Umpqua Indians of Oregon... Band of Umpqua Indians: (a) Section 49.123General provisions. (b) Section 49.124Rule for...

  6. 40 CFR 49.10050 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Implementation Plans for Tribes-Region X Implementation Plan for the Cow Creek Band of Umpqua Indians of Oregon... Band of Umpqua Indians: (a) Section 49.123General provisions. (b) Section 49.124Rule for...

  7. 40 CFR 49.10050 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Implementation Plans for Tribes-Region X Implementation Plan for the Cow Creek Band of Umpqua Indians of Oregon... Band of Umpqua Indians: (a) Section 49.123General provisions. (b) Section 49.124Rule for...

  8. 78 FR 24700 - Approval and Promulgation of Implementation Plans; North Dakota; Regional Haze State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-26

    ... State Implementation Plan; Federal Implementation Plan for Interstate Transport of Pollution Affecting Visibility and Regional Haze; Reconsideration; Announcement of Public Hearings AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of public hearings; extension of comment period. SUMMARY: On March...

  9. 76 FR 60777 - Approval and Promulgation of Implementation Plans; North Dakota; Regional Haze State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-30

    ... State Implementation Plan; Federal Implementation Plan for Interstate Transport of Pollution Affecting Visibility and Regional Haze; Correction of Public Hearing AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule; Correction of Public Hearing. SUMMARY: EPA is changing the public...

  10. 75 FR 45082 - Revisions to the California State Implementation Plan, Santa Barbara County Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-02

    ... Air Pollution Control District (SBCAPCD) portion of the California State Implementation Plan (SIP... Environmental protection, Air pollution control, Intergovernmental relations, Nitrogen dioxide, Ozone, Reporting... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Santa Barbara County...

  11. 78 FR 11809 - Approval and Promulgation of Implementation Plans; State of Missouri; Restriction of Emission of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-20

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; State of Missouri; Restriction of Emission of Particulate Matter From Industrial Processes AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA proposes to approve the State Implementation Plan...

  12. 77 FR 48061 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Regional Haze State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-13

    ...; Regional Haze State Implementation Plan; Correction AGENCY: Environmental Protection Agency (EPA). ] ACTION... paragraph heading regarding EPA's limited approval of Pennsylvania's Regional Haze State Implementation Plan... final rulemaking action announcing our limited approval of Pennsylvania's Regional Haze SIP. In...

  13. 75 FR 18782 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Alternate Monitoring...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-13

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Indiana; Alternate Monitoring Requirements for Indianapolis Power and Light--Harding Street Station AGENCY: Environmental... State Implementation Plan alternative monitoring requirements for Indianapolis Power and Light...

  14. 77 FR 51930 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Attainment Plan for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-28

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania... annual fine particulate matter (PM 2.5 ) national ambient air quality standard (NAAQS) for the... submittal are available at the Pennsylvania Department of Environmental Protection, Bureau of Air...

  15. Aqua's First 10 Years: An Overview

    NASA Technical Reports Server (NTRS)

    Parkinson, Claire L.

    2012-01-01

    NASA's Aqua spacecraft was launched at 2:55 a.m. on May 4, 2002, from Vandenberg Air Force Base in California, into a near-polar, sun-synchronous orbit at an altitude of 705 km. Aqua carries six Earth-observing instruments to collect data on water in all its forms (liquid, vapor, and solid) and on a wide variety of additional Earth system variables (Parkinson 2003). The design lifetime for Aqua's prime mission was 6 years, and Aqua is now well into its extended mission, approaching 10 years of successful operations. The Aqua data have been used for hundreds of scientific studies and continue to be used for scientific discovery and numerous practical applications.

  16. Guideline adaptation and implementation planning: a prospective observational study

    PubMed Central

    2013-01-01

    Background Adaptation of high-quality practice guidelines for local use has been advanced as an efficient means to improve acceptability and applicability of evidence-informed care. In a pan-Canadian study, we examined how cancer care groups adapted pre-existing guidelines to their unique context and began implementation planning. Methods Using a mixed-methods, case-study design, five cases were purposefully sampled from self-identified groups and followed as they used a structured method and resources for guideline adaptation. Cases received the ADAPTE Collaboration toolkit, facilitation, methodological and logistical support, resources and assistance as required. Documentary and primary data collection methods captured individual case experience, including monthly summaries of meeting and field notes, email/telephone correspondence, and project records. Site visits, process audits, interviews, and a final evaluation forum with all cases contributed to a comprehensive account of participant experience. Results Study cases took 12 to >24 months to complete guideline adaptation. Although participants appreciated the structure, most found the ADAPTE method complex and lacking practical aspects. They needed assistance establishing individual guideline mandate and infrastructure, articulating health questions, executing search strategies, appraising evidence, and achieving consensus. Facilitation was described as a multi-faceted process, a team effort, and an essential ingredient for guideline adaptation. While front-line care providers implicitly identified implementation issues during adaptation, they identified a need to add an explicit implementation planning component. Conclusions Guideline adaptation is a positive initial step toward evidence-informed care, but adaptation (vs. ‘de novo’ development) did not meet expectations for reducing time or resource commitments. Undertaking adaptation is as much about the process (engagement and capacity building) as it

  17. A Plan for the Development and Implementation of Planning, Programming, Budgeting and Evaluation System, and Management Information System.

    ERIC Educational Resources Information Center

    Wesolowski, Zdzislaw P.

    The implementation of a Planning, Budgeting and Evaluation System (PPBES) and a Management Information System (MIS) at Polk Community College will consider the needs, the objectives, and the priorities of the college. The tasks in the development and implementation of a PPBS system are: development of an implementation plan (specific tasks…

  18. 40 CFR 49.9930 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.9930 Section 49.9930 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Coeur D'alene Tribe of the Coeur D'alene Reservation, Idaho §...

  19. 40 CFR 49.10590 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10590 Section 49.10590 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Quinault Tribe of the Quinault Reservation, Washington §...

  20. 78 FR 64430 - Partial Approval and Disapproval of Air Quality State Implementation Plans; Nevada...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-29

    ... AGENCY 40 CFR part 52 Partial Approval and Disapproval of Air Quality State Implementation Plans; Nevada... entitled ``Partial Approval and Disapproval of Air Quality Implementation Plans; Nevada; Infrastructure.... SUMMARY: EPA is proposing to partially approve and partially disapprove State Implementation Plan...

  1. 78 FR 40654 - Approval, Disapproval and Promulgation of Implementation Plans; State of Wyoming; Regional Haze...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-08

    ...; Regional Haze State Implementation Plan; Federal Implementation Plan for Regional Haze; Notice of Public... State Implementation Plan (SIP) addressing regional haze under. We are making this change in response to... partially approving and partially disapproving Wyoming's 40 CFR 51.309(g) regional haze SIP. 78 FR 34738....

  2. 77 FR 43205 - Notice of Data Availability for Approval, Disapproval and Promulgation of Implementation Plans...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-24

    ... Implementation Plans; State of Wyoming; Regional Haze State Implementation Plan; Federal Implementation Plan for Regional Haze AGENCY: Environmental Protection Agency. ACTION: Notice of data availability (NODA). SUMMARY..., 2011, that addresses regional haze. (Docket ID No. EPA-R08- OAR-2012-0026). This information...

  3. MMI's Metadata and Vocabulary Solutions: 10 Years and Growing

    NASA Astrophysics Data System (ADS)

    Graybeal, J.; Gayanilo, F.; Rueda-Velasquez, C. A.

    2014-12-01

    The Marine Metadata Interoperability project (http://marinemetadata.org) held its public opening at AGU's 2004 Fall Meeting. For 10 years since that debut, the MMI guidance and vocabulary sites have served over 100,000 visitors, with 525 community members and continuous Steering Committee leadership. Originally funded by the National Science Foundation, over the years multiple organizations have supported the MMI mission: "Our goal is to support collaborative research in the marine science domain, by simplifying the incredibly complex world of metadata into specific, straightforward guidance. MMI encourages scientists and data managers at all levels to apply good metadata practices from the start of a project, by providing the best guidance and resources for data management, and developing advanced metadata tools and services needed by the community." Now hosted by the Harte Research Institute at Texas A&M University at Corpus Christi, MMI continues to provide guidance and services to the community, and is planning for marine science and technology needs for the next 10 years. In this presentation we will highlight our major accomplishments, describe our recent achievements and imminent goals, and propose a vision for improving marine data interoperability for the next 10 years, including Ontology Registry and Repository (http://mmisw.org/orr) advancements and applications (http://mmisw.org/cfsn).

  4. Strategies and Exemplars for Public Outreach Events: Planning, Implementation, Evaluation

    NASA Astrophysics Data System (ADS)

    Cobb, W. H.; Buxner, S.; Shipp, S. S.; Shebby, S.

    2015-12-01

    IntroductionEach year the National Aeronautics and Space Administration (NASA) sponsors a variety of public outreach events to share information with educators, students, and the general public. These events are designed to increase interest in and awareness of the mission and goals of NASA. Planning and implementation best practices gleaned from the NASA SMD Education's review of large-scale events, "Best Practices in Outreach Events" will be shared. Outcomes from an event, i C Ceres, celebrating the Dawn mission's arrival at dwarf planet Ceres that utilized these strategies will be shared. Best practices included can be pertinent for all event organizers and evaluators regardless of event size. BackgroundThe literature review focused on identifying evaluations of large-scale public outreach events—and, within these evaluations, identifying best practices. The following criteria for identifying journal articles and reports to potentially include: Public, science-related events open to adults and children. Events with more than 1,000 attendees. Events that occurred during the last 5 years. Evaluations that included information on data collected from visitors and/or volunteers. Evaluations that specified the type of data collected, methodology, and associated results. Planning and Implementation Best PracticesThe literature review revealed key considerations for planning and of large-scale events implementing events. A summary of related best practices is presented below. 1) Advertise the event 2) Use and advertise access to scientists 3) Recruit scientists using these findings 4) Ensure that the event is group and particularly child friendly 5) Target specific event outcomes Best Practices Informing Real-world Planning, Implementation and EvaluationDawn mission's collaborative design of a series of events, i C Ceres, including in-person, interactive events geared to families and live presentations will be shared. Outcomes and lessons learned will be imparted

  5. GEWEX America Prediction Project (GAPP) Science and Implementation Plan

    NASA Technical Reports Server (NTRS)

    2004-01-01

    The purpose of this Science and Implementation Plan is to describe GAPP science objectives and the activities required to meet these objectives, both specifically for the near-term and more generally for the longer-term. The GEWEX Americas Prediction Project (GAPP) is part of the Global Energy and Water Cycle Experiment (GEWEX) initiative that is aimed at observing, understanding and modeling the hydrological cycle and energy fluxes at various time and spatial scales. The mission of GAPP is to demonstrate skill in predicting changes in water resources over intraseasonal-to-interannual time scales, as an integral part of the climate system.

  6. In situ vitrification model development and implementation plan

    SciTech Connect

    MacKinnon, R.J.; Murray, P.E.; Johnson, R.W.; Hagrman, D.L.; Slater, C.E.; Marwil, E.S.

    1990-08-01

    This document describes the In Situ Vitrification (ISV) Analysis Package being developed at the INEL to provide analytical support for (ISV) safety analysis and treatment performance predictions. Mathematical models and features which comprise this analysis package are presented and the proposed approach to model development and implementation is outlined. The objective of this document is two fold: to define preliminary design information and modeling objectives so that ISV modeling personnel can effectively modify existing models and formulate new models which are consistent with the objectives of the ISV treatability study and to provide sufficient technical information for internal and external reviewers to detect any shortcomings in model development and implementation plans. 27 refs., 17 figs., 3 tabs.

  7. Environmental Restoration Quality Program Implementation Plan. Environmental Restoration Program

    SciTech Connect

    Not Available

    1992-08-01

    The Environmental Restoration (ER) Program requirements for implementation of DOE Order 5700.6C are identified in the Environmental Restoration Quality Program Plan, (QPP). Management systems necessary to implement the ER QPP consist of the necessary standards and procedures required to be developed to adequately control ER processes. To the extent possible, Martin Marietta Energy Systems, Inc., standards and procedures will be utilized at the ER Program level, and requirements will not be repeated. The quality management systems identified for enhancement or development are identified in the section on Procedure Development Strategy and directly relate to unique ER Program activities. Procedures and standards that currently exist in the ER Program will be validated for compliance with ER QPP requirements.

  8. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  9. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  10. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  11. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  12. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  13. 77 FR 44555 - Partial Approval and Disapproval of Air Quality Implementation Plans; Arizona; State Board...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-30

    ... AGENCY 40 CFR Part 52 Partial Approval and Disapproval of Air Quality Implementation Plans; Arizona... State ] Implementation Plan (SIP) revision submitted by the State of Arizona to address the requirements... develop a revised plan. We are taking comments on this proposal and plan to follow with a final...

  14. A strategic approach for Water Safety Plans implementation in Portugal.

    PubMed

    Vieira, Jose M P

    2011-03-01

    Effective risk assessment and risk management approaches in public drinking water systems can benefit from a systematic process for hazards identification and effective management control based on the Water Safety Plan (WSP) concept. Good results from WSP development and implementation in a small number of Portuguese water utilities have shown that a more ambitious nationwide strategic approach to disseminate this methodology is needed. However, the establishment of strategic frameworks for systematic and organic scaling-up of WSP implementation at a national level requires major constraints to be overcome: lack of legislation and policies and the need for appropriate monitoring tools. This study presents a framework to inform future policy making by understanding the key constraints and needs related to institutional, organizational and research issues for WSP development and implementation in Portugal. This methodological contribution for WSP implementation can be replicated at a global scale. National health authorities and the Regulator may promote changes in legislation and policies. Independent global monitoring and benchmarking are adequate tools for measuring the progress over time and for comparing the performance of water utilities. Water utilities self-assessment must include performance improvement, operational monitoring and verification. Research and education and resources dissemination ensure knowledge acquisition and transfer.

  15. DDC 10 Year Requirements and Planning Study. Survey Results Report

    DTIC Science & Technology

    1976-01-01

    Inmproved Marketing of DDC Products and Serviceir: 0 The extremely low level of awareness of most DDM servrces (i.e., only 4 out of 22 DDC services...3-4 3.1.7 Information Analysis Centers........-.... . 3-7 3.1.8 User Training and Marketing ............................ . 3-7 3.2...welcome such educational progra’is. 1-4 V • ._ • • • .• =•, .:7; • ’I,൙. ,• ,•a -.- ’ •, •-• ’’ "- = ’ "".. 0 The importance of marketing of DDC services

  16. DDC 10 Year Requirements and Planning Study. Literature Survey Report

    DTIC Science & Technology

    1975-10-17

    cooperation and Sta...ardiz.tion.. . .... 3-3 +. ! . ;Ir•S lr e ...... a.. or... l.t. on........................ :1: !- rentralizatiou of ftocesuing an.d...19l MME3S. 1. Anderta. T ’*-trae4 Inforistim Lot U1.6 Orgali aitwic ft’r Ecankomi Cooperation and flewe101 Nt, 1973. Z. ASIS. "An 1nvietimation of...Federal techeicol informtio services will be marned into a central Orail•iatioo. b1. Federal dogecie* will employ ceotracter staff to perferm vlrtuall. all of their ilfr’wmatiom prwoessiU activities. Ii

  17. DDC 10 Year Requirements and Planning Study. Interagency Survey Report

    DTIC Science & Technology

    1975-12-12

    19107 I C-ONT RO L-I1N-G 0f FIC EN ANAE AND ADDRESS 12. R’IPORT DATE Defense D(,cumentation Center 12 December 1975 Cameron Station, Building 5 13. NjMSER...its primary mission to serve the DoD RDT&E com- munity. A tertiary consideration is its role in advancing the state-of-the-art of information processing...has subjective and pragmacic value to its users, but this value has been difficult, if not impossible, to measure to date ; thus, Information agencies

  18. Idaho National Laboratory Site Long-Term Stewardship Implementation Plan

    SciTech Connect

    B. E. Olaveson

    2006-07-27

    The U.S. Department of Energy has established long-term stewardship programs to protect human health and the environment at sites where residual contamination remains after site cleanup. At the Idaho National Laboratory Site, Comprehensive Environmental Response, Compensation, and Liability Act (CERLA) long-term stewardship activities performed under the aegis of regulatory agreements, the Federal Facility Agreement and Consent Order for the Idaho National Laboratory, and state and federal requirements are administered primarily under the direction of the Idaho Cleanup Project. It represents a subset of all on-going environmental activity at the Idaho National Laboratory Site. This plan provides a listing of applicable CERCLA long-term stewardship requirements and their planned and completed implementation goals. It proffers the Long-Term Stewardship Environmental Data Warehouse for Sitewide management of environmental data. This plan will be updated as needed over time, based on input from the U.S. Department of Energy, its cognizant subcontractors, and other local and regional stakeholders.

  19. Maintenance implementation plan for the Fast Flux Test Facility

    SciTech Connect

    Boyd, J.A.

    1997-01-30

    This plan implements the U.S. Department of Energy (DOE) 4330.4B, Maintenance Management Program (1994), at the Fast Flux Test Facility (FFTF). The FFTF is a research and test reactor located near Richland, Washington, and is operated under contract for the DOE by the B&W Hanford Company (BWHC). The intent of this Maintenance Implementation Plan (MIP) is to describe the manner in which the activities of the maintenance function are executed and controlled at the FFTF and how this compares to the requirements of DOE 4330.4B. The MIP ii a living document that is updated through a Facility Maintenance Self- Assessment Program. During the continuing self-assessment program, any discrepancies found are resolved to meet DOE 4330.4B requirements and existing practices. The philosophy of maintenance management at the FFTF is also describe within this MIP. This MIP has been developed based on information obtained from various sources including the following: * A continuing self-assessment against the requirements of the Conduct of Maintenance Order * In-depth reviews conducted by the members of the task team that assembled this MIP * Inputs from routine audits and appraisals conducted at the facility The information from these sources is used to identify those areas in which improvements could be made in the manner in which the facility conducts maintenance activities. The action items identified in Rev. 1 of the MIP have been completed. The MIP is arranged in six sections. Section I is this Executive Summary. Section 2 describes the facility and its 0683 history. Section 3 describes the philosophy of the graded approach and how it is applied at FFTF. Section 3 also discusses the strategy and the basis for the prioritizing resources. Section 4 contains the detailed discussion of `the elements of DOE 4330.4B and their state of implementation. Section 5 is for waivers and requested deviations from the requirements of the order. Section 6 contains a copy of the Maintenance

  20. Planning and implementing a microcomputer local-area network.

    PubMed

    Malone, P M

    1993-06-01

    Factors to be considered in planning and implementing a microcomputer local-area network (LAN) in a pharmacy department are discussed. Reasons for implementing a LAN include the ability to share data, programs, and peripheral devices among multiple users. The network operating system may be full featured or a peer-to-peer system. Full-featured networks require a dedicated file server but are more powerful and versatile. The file server, if used, is the most important piece of equipment. Factors that affect the choice of a file server are the processor, the bus, memory and speed, the supplier, and the power supply. It is necessary to select network adapters and wiring and to decide whether any of the department's current computer equipment will be used in the network. Decisions must also be made about software. The equipment should be set up by the computer services department or a vendor. Two or more pharmacists must be appointed and trained as supervisors to manage the network, diagnose and correct problems, perform network backup, and guard against computer viruses. Security is a major concern because of the need for confidentiality, the licensure of software for only a limited number of users, and the risk of inadvertent alteration or erasure of data. Network users must be trained to use the system properly. Department managers should consider the need to access the LAN from computers outside the department and the possible incorporation of the LAN into a wide-area network. A microcomputer LAN can provide valuable information services, but careful planning is necessary to avoid pitfalls and to ensure that the network meets current and future needs.

  1. Participatory System Dynamics Modeling: Increasing Stakeholder Engagement and Precision to Improve Implementation Planning in Systems.

    PubMed

    Zimmerman, Lindsey; Lounsbury, David W; Rosen, Craig S; Kimerling, Rachel; Trafton, Jodie A; Lindley, Steven E

    2016-11-01

    Implementation planning typically incorporates stakeholder input. Quality improvement efforts provide data-based feedback regarding progress. Participatory system dynamics modeling (PSD) triangulates stakeholder expertise, data and simulation of implementation plans prior to attempting change. Frontline staff in one VA outpatient mental health system used PSD to examine policy and procedural "mechanisms" they believe underlie local capacity to implement evidence-based psychotherapies (EBPs) for PTSD and depression. We piloted the PSD process, simulating implementation plans to improve EBP reach. Findings indicate PSD is a feasible, useful strategy for building stakeholder consensus, and may save time and effort as compared to trial-and-error EBP implementation planning.

  2. 40 CFR 52.2479 - Contents of the federally approved, State submitted implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Plan for Air Quality, for compliance with requirements of the Federal Clean Air Act, have been approved..., implementation plan. Washington State Implementation Plan for Air Quality State and Local Requirements Table of....3Air Quality Monitoring, Data Reporting and Surveillance Provisions 1.4Maintenance of Pay...

  3. 40 CFR 52.2479 - Contents of the federally approved, State submitted implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Plan for Air Quality, for compliance with requirements of the Federal Clean Air Act, have been approved..., implementation plan. Washington State Implementation Plan for Air Quality State and Local Requirements Table of....3Air Quality Monitoring, Data Reporting and Surveillance Provisions 1.4Maintenance of Pay...

  4. 40 CFR 52.2479 - Contents of the federally approved, State submitted implementation plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Plan for Air Quality, for compliance with requirements of the Federal Clean Air Act, have been approved..., implementation plan. Washington State Implementation Plan for Air Quality State and Local Requirements Table of....3Air Quality Monitoring, Data Reporting and Surveillance Provisions 1.4Maintenance of Pay...

  5. 78 FR 63145 - Approval and Promulgation of State Implementation Plans; Hawaii; Infrastructure Requirements for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-23

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of State Implementation Plans; Hawaii; Infrastructure... Plan ] (SIP) revision submitted by the State of Hawaii on February 13, 2013, pursuant to the... Promulgation of State Implementation Plans; Hawaii; Infrastructure Requirements for the 1997 8-Hour Ozone...

  6. 78 FR 48373 - Approval and Promulgation of Air Quality Implementation Plans; Texas; Victoria County; 1997 8...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-08

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Texas; Victoria... Implementation Plan (SIP). The revision consists of a maintenance plan for Victoria County developed to...

  7. Y-12 Site environmental protection program implementation plan (EPPIP)

    SciTech Connect

    1996-11-01

    The Y-12 Plant Environmental Protection Program is conducted to: (1) protect public health and the environment from chemical and radiological releases occurring from current plant operations and past waste management and operational practices; (2) ensure compliance with federal, state, and local environmental regulations and DOE directives; (3) identify potential environmental problems; (4) evaluate existing environmental contamination and determine the need for remedial actions and mitigative measures; (5) monitor the progress of ongoing remedial actions and cleanup measures; and (6) inform the public of environmental issues relating to DOE operations. DOE Order 5400.1, General Environmental Protection Program, defines the general requirements for environmental protection programs at DOE facilities. This Environmental Protection Program Implementation Plan (EPPIP) defines the methods by which the Y-12 Plant staff will comply with the order by: (1) referencing environmental protection goals and objectives and identifying strategies and timetables for attaining them; (2) providing the overall framework for the design and implementation of the Y-12 Environmental Protection Program; and (3) assigning responsibilities for complying with the requirements of the order. The EPPIP is revised and updated annually.

  8. Herschel Data Processing Development: 10 Years After

    NASA Astrophysics Data System (ADS)

    Ott, S.

    2013-10-01

    The Herschel Space Observatory, the fourth cornerstone mission in the ESA science program, was launched on the 14th of May 2009. As a cryogenic mission Herschel's operational lifetime is consumable-limited by its supply of liquid helium, estimated to be depleted by March 2013. Afterwards the mission will start a 4.75 year long post-operations phase. Originally it was considered sufficient to provide astronomers with raw data and software tools to carry out a basic data reduction, and no “data products” were to be generated and delivered. Following the realisation that the expectations of the astronomical community on the deliverables of an observatory mission evolved it was agreed to implement a single ‘cradle to grave’ data analysis system supporting the needs of all users for the whole project cycle. We will summarise the lessons learned during those ten years of Herschel data processing development, address the main challenges of this major software development project, and reflect on what went well, what needed to be adapted, and our open points.

  9. Administrative Reinstatement Interlock Programs: Florida, a 10-Year Study

    PubMed Central

    Voas, Robert B.; Tippetts, A. Scott; Grosz, Milton

    2013-01-01

    Background Interlocks reduce driving-under-the-influence (DUI) recidivism by 64%, but offenders resist installing them, preferring to risk driving while their driver’s licenses are revoked. One method of motivating offenders to install an interlock is require it for reinstatement of their driver’s license. This report updates an earlier evaluation of the administrative reinstatement interlock program (ARIP) procedure implemented in Florida in 2002. Method Driver records and interlock program records covering 120,000 DUI offenders were followed over 10 years. The flow through the sanction system—conviction, reinstatement, interlock program, and postinterlock period—is described. Logistical regression was used to identify the characteristics of offenders who installed interlocks, and survival analysis was used to evaluate the recidivism of offenders in the various stages in the ARIP. Results At any given time, approximately one third of the convicted offenders were serving their license-revocation periods. Half of the offenders who completed their revocation periods remain unqualified for reinstatement because they do not fulfill other requirements. ARIP offenders who do qualify for reinstatement and install interlocks have lower recidivism rates while the devices are on their vehicles. Conclusions After 10 years, Florida’s ARIP is a mature system that succeeds in forcing all offenders in the program who qualify for reinstatement to install an interlock for at least 6 months. However, half of all offenders who complete their mandatory revocation period are either unable to, or choose not to, qualify for reinstatement. PMID:23442206

  10. 12 CFR 563b.500. - What management stock benefit plans may I implement?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false What management stock benefit plans may I... management stock benefit plans may I implement? (a) During the 12 months after your conversion, you may... employee stock benefit plan (collectively, ESOP), and a management recognition plan (MRP), provided...

  11. 77 FR 65133 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-25

    ... Identification of plan. * * * * * (c) * * * (379) * * * (i) * * * (E) Mojave Desert Air Quality Management... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA...

  12. 76 FR 31242 - Revisions to the California State Implementation Plan, Santa Barbara County Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-31

    ... Environmental protection, Air pollution control, Incorporation by reference, Intergovernmental relations... Identification of plan. * * * * * (c) * * * (359) * * * (i) * * * (E) Santa Barbara County Air Pollution Control... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Santa Barbara County...

  13. 75 FR 21197 - Approval and Promulgation of Air Quality Implementation Plans; New Mexico; Revisions to New...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-23

    ...; Revisions to New Mexico Transportation Conformity Regulations AGENCY: Environmental Protection Agency (EPA... Implementation Plan (SIP) concerning the State transportation conformity rules. The plan revisions are intended to ensure consistency with amendments to the Federal Transportation Conformity Rule. These...

  14. 77 FR 6529 - Approval and Promulgation of Implementation Plans; Alabama, Georgia, and Tennessee: Chattanooga...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-08

    ...: Chattanooga; Particulate Matter 2002 Base Year Emissions Inventory AGENCY: Environmental Protection Agency... ) 2002 base year emissions inventory portion of the State Implementation Plan (SIP) revision submitted...

  15. Energy Efficiency/Renewable Energy Programs in State Implementation Plans - Guidance Documents

    EPA Pesticide Factsheets

    final document that provides guidance to States and local areas on quantifying and including emission reductions from energy efficiency and renewable energy measures in State Implementation Plans (SIPS).

  16. 77 FR 52630 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Volatile Organic...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-30

    ... Organic Compounds; Architectural and Industrial Maintenance Coatings AGENCY: Environmental Protection... Implementation Plan (SIP) the addition of a new rule that sets emissions limits on the amount of volatile...

  17. Weatherization and Intergovernmental Program - State Energy Program Helps States Plan and Implement Energy Efficiency

    SciTech Connect

    2010-06-01

    State energy offices use SEP funds to develop state plans that identify opportunities for adopting renewable energy and energy efficiency technologies, and implementing programs to improve energy sustainability.

  18. 75 FR 30710 - Approval and Promulgation of Air Quality Implementation Plans; Wisconsin; Particulate Matter...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-02

    ... Implementation Plans; Wisconsin; Particulate Matter Standards; Withdrawal of Direct Final Rule AGENCY... matter standards by adding fine particulate standards and revoking the state's course particulate standards. The State of Wisconsin submitted this revision as a modification to the State Implementation...

  19. 75 FR 26685 - Approval and Promulgation of Implementation Plans and Designation of Areas for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-12

    ... suits for not implementing air pollution prevention plans in 1997, even though they were not on notice... provisions for the implementation of part D requirements (NSR permit programs); provisions for air...

  20. Mumps Cases Hit 10-Year High in U.S.

    MedlinePlus

    ... page: https://medlineplus.gov/news/fullstory_162676.html Mumps Cases Hit 10-Year High in U.S. Contagious ... 21, 2016 WEDNESDAY, Dec. 21, 2016 (HealthDay News) -- Mumps cases have hit a 10-year high in ...

  1. Implementation plan for WRAP Module 1 operational readiness review

    SciTech Connect

    Irons, L.G.

    1994-11-04

    The Waste Receiving and Processing Module 1 (WRAP 1) will be used to receive, sample, treat, and ship contact-handled (CH) transuranic (TRU), low-level waste (LLW), and low-level mixed waste (LLMW) to storage and disposal sites both on the Hanford site and off-site. The primary mission of WRAP 1 is to characterize and certify CH waste in 55-gallon and 85-gallon drums; and its secondary function is to certify CH waste standard waste boxes (SWB) and boxes of similar size for disposal. The WRAP 1 will provide the capability for examination (including x-ray, visual, and contents sampling), limited treatment, repackaging, and certification of CH suspect-TRU waste in 55-gallon drums retrieved from storage, as well as newly generated CH LLW and CH TRU waste drums. The WRAP 1 will also provide examination (X-ray and visual only) and certification of CH LLW and CH TRU waste in small boxes. The decision to perform an Operational Readiness Review (ORR) was made in accordance with WHC-CM-5-34, Solid Waste Disposal Operations Administration, Section 1.4, Operational Readiness Activities. The ORR will ensure plant and equipment readiness, management and personnel readiness, and management programs readiness for the initial startup of the facility. This implementation plan is provided for defining the conduct of the WHC ORR.

  2. Implementation of an interactive liver surgery planning system

    NASA Astrophysics Data System (ADS)

    Wang, Luyao; Liu, Jingjing; Yuan, Rong; Gu, Shuguo; Yu, Long; Li, Zhitao; Li, Yanzhao; Li, Zhen; Xie, Qingguo; Hu, Daoyu

    2011-03-01

    Liver tumor, one of the most wide-spread diseases, has a very high mortality in China. To improve success rates of liver surgeries and life qualities of such patients, we implement an interactive liver surgery planning system based on contrastenhanced liver CT images. The system consists of five modules: pre-processing, segmentation, modeling, quantitative analysis and surgery simulation. The Graph Cuts method is utilized to automatically segment the liver based on an anatomical prior knowledge that liver is the biggest organ and has almost homogeneous gray value. The system supports users to build patient-specific liver segment and sub-segment models using interactive portal vein branch labeling, and to perform anatomical resection simulation. It also provides several tools to simulate atypical resection, including resection plane, sphere and curved surface. To match actual surgery resections well and simulate the process flexibly, we extend our work to develop a virtual scalpel model and simulate the scalpel movement in the hepatic tissue using multi-plane continuous resection. In addition, the quantitative analysis module makes it possible to assess the risk of a liver surgery. The preliminary results show that the system has the potential to offer an accurate 3D delineation of the liver anatomy, as well as the tumors' location in relation to vessels, and to facilitate liver resection surgeries. Furthermore, we are testing the system in a full-scale clinical trial.

  3. Ames Research Center FY 2000 Implementation Plan: Leading Technology into the New Millennium

    NASA Technical Reports Server (NTRS)

    2000-01-01

    This document presents the implementation plan for Ames Research Center (ARC) within the overall framework of the NASA Strategic Plan. It describes how ARC intends to implement its Center of Excellence responsibilities, Agency assigned missions, Agency and Enterprise lead programs, and other roles in support of NASA's vision and mission. All Federal agencies are required by the 1993 Government Performance and Results Act to implement a long-term strategic planning process that includes measurable outcomes and strict accountability. At NASA, this planning process is shaped by the Space Act of 1958, annual appropriations, and other external mandates, as well as by customer requirements. The resulting Strategic Plan sets the overall architecture for what we do, identifies who our customers are, and directs where we are going and why. The Strategic Plan is the basis upon which decisions regarding program implementation and resource deployment are made. Whereas the strategic planning process examines the long-term direction of the organization and identifies a specific set of goals, the implementation planning process examines the detailed performance of the organization and allocates resources toward meeting these goals. It is the purpose of this implementation document to provide the connection between the NASA Strategic Plan and the specific programs and support functions that ARC employees perform. This connection flows from the NASA Strategic Plan, through the various Strategic Enterprise plans to the ARC Center of Excellence, primary missions, Lead Center programs, program support responsibilities, and ultimately, to the role of the individual ARC employee.

  4. Marketing: Realistic Tips for Planning and Implementation in Special Libraries.

    ERIC Educational Resources Information Center

    Kassel, Amelia

    2002-01-01

    Discusses the need for special libraries to have a marketing plan in order to increase support and plan for the future. Topics include finding the time; budgets and marketing; promoting library services; the use of outside consultants; making market planning a continuous process; and marketing efforts at product shows. (LRW)

  5. The VLA Sky Survey (VLASS): Technical Implementation Plans and Progress

    NASA Astrophysics Data System (ADS)

    Myers, Steven T.; Law, Casey J.; Baum, Stefi Alison; Chandler, Claire J.; Chatterjee, Shami; Lacy, Mark; Murphy, Eric J.; VLASS Survey Science Group

    2016-01-01

    The VLA Sky Survey (VLASS) was initiated to exploit the science and technical opportunities for a new large radio astronomical survey using the Karl G. Jansky Very Large Array. In March 2015, the proposal for the VLASS underwent a formal Community Review. What emerged from this review is a 5400 hour project to survey the 33885 square degrees of the sky above Declination -40 degrees from 2-4 GHz at 2MHz frequency resolution and 2.5" angular resolution. Over the survey duration of 7 years, each area of the sky will be covered in 3 epochs spaced 32 months apart, to a depth of 0.12mJy/beam rms noise per epoch (0.07mJy/beam combined) in total intensity (Stokes I) and including full polarization. Observations are planned to commence in mid-2016. The raw data will be available in the NRAO archive immediately with no proprietary period and science data products will be provided to the community in a timely manner.In this presentation we describe the survey design and the Technical Implementation Plan (TIP) for the VLASS. The VLASS Basic Data Products (BDP) that will be produced by the survey team include: raw and calibrated visibility data, quick-look continuum images, single-epoch images and spectral image cubes, single-epoch basic object catalogs, and cumulative "static sky" images and image cubes and basic object catalogs to the full survey depth. Calibration, image processing, and analysis for the VLASS will be carried out through automated pipelines being developed at NRAO. Integral to this workflow is maintaining Quality Assurance throughout the system from telescope to archive. The storage and archive services budgeted for the BDP is 1PB for the data and images combined. Significantly higher storage would be required to serve the highest spectral resolution spectral cubes over the full sky area, and thus devising an affordable strategy for providing these services is critical, for example through "Processing on Demand" based on user query of the archive. We will

  6. EPOS Thematic Core Service Anthropogenic Hazards: Implementation Plan

    NASA Astrophysics Data System (ADS)

    Orlecka-Sikora, Beata; Lasocki, Stanislaw; Grasso, Jean Robert; Schmittbuhl, Jean; Styles, Peter; Kwiatek, Grzegorz; Sterzel, Mariusz; Garcia, Alexander

    2015-04-01

    EPOS Thematic Core Service ANTHROPOGENIC HAZARDS (TCS AH) aims to integrate distributed research infrastructures (RI) to facilitate and stimulate research on anthropogenic hazards (AH) especially those associated with the exploration and exploitation of geo-resources. The innovative element is the uniqueness of the integrated RI which comprises two main deliverables: (1) Exceptional datasets, called "episodes", which comprehensively describe a geophysical process; induced or triggered by human technological activity, posing hazard for populations, infrastructure and the environment, (2) Problem-oriented, bespoke services uniquely designed for the discrimination and analysis of correlations between technology, geophysical response and resulting hazard. These objectives will be achieved through the Science-Industry Synergy (SIS) built by EPOS WG10, ensuring bi-directional information exchange, including unique and previously unavailable data furnished by industrial partners. The Episodes and services to be integrated have been selected using strict criteria during the EPOS PP. The data are related to a wide spectrum of inducing technologies, with seismic/aseismic deformation and production history as a minimum data set requirement and the quality of software services is confirmed and referenced in literature. Implementation of TCS AH is planned for four years and requires five major activities: (1) Strategic Activities and Governance: will define and establish the governance structure to ensure the long-term sustainability of these research infrastructures for data provision through EPOS. (2) Coordination and Interaction with the Community: will establish robust communication channels within the whole TCS AH community while supporting global EPOS communication strategy. (3) Interoperability with EPOS Integrated Core Service (ICS) and Testing Activities: will coordinate and ensure interoperability between the RIs and the ICS. Within this modality a functional e

  7. 76 FR 20906 - Approval and Promulgation of Air Quality Implementation Plans; Indiana

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-14

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Indiana AGENCY... State Implementation Plan (SIP) under the Clean Air Act. Indiana submitted revisions to the particulate...: (312) 408-2279. 4. Mail: Douglas Aburano, Chief, Control Strategies Section, Air Programs Branch...

  8. 78 FR 63878 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Revised Ambient Air...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-25

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Virginia; Revised Ambient Air Quality Standards for Fine Particulate Matter AGENCY: Environmental Protection Agency (EPA... Commonwealth of Virginia State Implementation Plan (SIP). The revisions add ambient air quality standards...

  9. 75 FR 65594 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-26

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality Standards AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY... consolidation of Ohio's Ambient Air Quality Standards (AAQS) into Ohio's State Implementation Plan (SIP)...

  10. 78 FR 30770 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; Air Quality Standards...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-23

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Illinois; Air... National Ambient Air Quality Standards (NAAQS) for ozone and particulate matter (PM). EPA is approving a... Implementation Plan at 35 Illinois Administrative Code part 243, which updates National Ambient Air...

  11. 78 FR 50369 - Approval and Promulgation of Air Quality Implementation Plans; Michigan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-19

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Michigan AGENCY... approve revisions to the State of Michigan's Clean Air Act State Implementation Plan (SIP) that Michigan... 2, Air Use Approval; and Part 19, New Source Review for Sources Impacting Nonattainment Areas,...

  12. 76 FR 20846 - Approval and Promulgation of Air Quality Implementation Plans; Indiana

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-14

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Indiana AGENCY... 2 emission limits in 326 IAC 7- 4.1-5 should result in improved air quality. There will no longer be... State Implementation Plan (SIP) under the Clean Air Act (CAA). These revisions address sulfur...

  13. 75 FR 65572 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-26

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality Standards AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule... of Ohio's Ambient Air Quality Standards (AAQS) into Ohio's State Implementation Plan (SIP) under...

  14. 78 FR 71508 - Availability of Federally-Enforceable State Implementation Plans for All States

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-29

    ... AGENCY 40 CFR Part 52 Availability of Federally-Enforceable State Implementation Plans for All States... forth all requirements of the applicable implementation plan for such State and shall publish notice in... with the Clean Air Act. SIP requirements applicable to all areas are provided in section 110. Part D...

  15. 75 FR 71548 - Availability of Federally-Enforceable State Implementation Plans for All States

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-24

    ... AGENCY 40 CFR Part 52 Availability of Federally-Enforceable State Implementation Plans for All States... setting forth all requirements of the applicable implementation plan for such State and shall publish... consistent with the Clean Air Act. SIP requirements applicable to all areas are provided in section 110....

  16. 77 FR 65490 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Fredericksburg 8-Hour...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-29

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Virginia... Virginia's State Implementation Plan (SIP) revision submitted by the Virginia Department of Environmental... model (MOVES2010a). The revised MVEBs continue to demonstrate maintenance of the 1997 8-hour...

  17. 77 FR 37328 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Central Indiana...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-21

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Indiana; Central... its Central Indiana 1997 8-hour ozone maintenance air quality State Implementation Plan (SIP) by...'s Motor Vehicle Emissions Simulator (MOVES) emissions model. The Central Indiana 1997 8-hour...

  18. 78 FR 63436 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Dayton-Springfield...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-24

    ...-2013-0378; FRL-9901-62-Region5] Approval and Promulgation of Air Quality Implementation Plans; Ohio... to revise the 1997 8-hour ozone maintenance air quality state implementation plan (SIP) for the... (MOVES) emissions model. The Dayton-Springfield area consists of Clark, Greene, Miami, and...

  19. 77 FR 75386 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Fredericksburg 8-Hour...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-20

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Virginia... Simulator emissions model (MOVES2010a). DATES: This correcting amendment is effective December 20, 2012 and... OF IMPLEMENTATION PLANS 0 1. The authority citation for 40 CFR part 52 continues to read as...

  20. 78 FR 11122 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Motor Vehicle...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-15

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Motor.... SUMMARY: EPA is proposing to approve a State Implementation Plan (SIP) revision submitted by the... Philadelphia Area) to reflect the use of the most recent version of the Motor Vehicle Emission Simulator...

  1. 75 FR 81471 - Approval and Promulgation of Air Quality Implementation Plans; Minnesota; Sulfur Dioxide SIP...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-28

    ... Dioxide SIP Revision for Marathon Petroleum St. Paul Park AGENCY: Environmental Protection Agency (EPA... dioxide State Implementation Plan revision for Marathon Petroleum in St. Paul Park. This submittal updates... (SO 2 ) State Implementation Plan (SIP) revision request for Marathon Petroleum Co, LLC, (Marathon)...

  2. 40 CFR 49.9870 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Implementation Plans for Tribes-Region X Implementation Plan for the Burns Paiute Tribe of the Burns Paiute... Burns Paiute Indian Colony: (a) Section 49.123General provisions. (b) Section 49.124Rule for limiting... rule for open burning. (h) Section 49.135Rule for emissions detrimental to public health or welfare....

  3. 40 CFR 49.9870 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Implementation Plans for Tribes-Region X Implementation Plan for the Burns Paiute Tribe of the Burns Paiute... Burns Paiute Indian Colony: (a) Section 49.123General provisions. (b) Section 49.124Rule for limiting... rule for open burning. (h) Section 49.135Rule for emissions detrimental to public health or welfare....

  4. 78 FR 73188 - Adequacy Status of Motor Vehicle Emissions Budget in Submitted State Implementation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-05

    ... AGENCY Adequacy Status of Motor Vehicle Emissions Budget in Submitted State Implementation Plan; Maricopa... vehicle emissions budget (MVEB) for particulate matter less than ten microns (PM-10) for the year 2012 in... Environmental Quality (ADEQ) as a revision to the Arizona State Implementation Plan (SIP). As a result of...

  5. 78 FR 48373 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Update of the Motor...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-08

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Update of the Motor Vehicle Emissions Budgets for the Lancaster 1997 8-Hour Ozone Maintenance Area AGENCY... the Commonwealth of Pennsylvania's (Pennsylvania) State Implementation Plan (SIP). One...

  6. 75 FR 64951 - Approval and Promulgation of Implementation Plans; Illinois; Voluntary Nitrogen Oxides Controls

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-21

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; Illinois; Voluntary Nitrogen... of a State Implementation Plan (SIP) revision for regulations governing Nitrogen Oxides (NO X... Nitrogen Oxides Control Rule IV. Why did EPA propose to disapprove this rule as a SIP revision? V....

  7. Implementation Intentions for Buying, Carrying, Discussing and Using Condoms: The Role of the Quality of Plans

    ERIC Educational Resources Information Center

    de Vet, Emely; Gebhardt, Winifred Anne; Sinnige, Judith; Van Puffelen, Anne; Van Lettow, Britt; de Wit, John B. F.

    2011-01-01

    Forming implementation intentions (i.e. action plans that specify when, where and how a person will act) could be effective in promoting condom use on a large scale. However, the technique implies that people are able to form high quality implementation plans that are likely to induce behaviour change. Young single females, aged 16-30 years old,…

  8. 78 FR 7703 - Revisions to the California State Implementation Plan, South Coast Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-04

    .... SUMMARY: EPA is proposing to approve a revision to the South Coast Air Quality Management District (SCAQMD... designed to implement the 2003 Air Quality Management Plan (AQMP) control measure, WST-01, and establish... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air...

  9. 76 FR 54384 - California State Implementation Plan, South Coast Air Quality Management District; Withdrawal of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-01

    ... AGENCY 40 CFR Part 52 California State Implementation Plan, South Coast Air Quality Management District... to the California State Implementation Plan (SIP). This revision concerned South Coast Air Quality Management District (SCAQMD) Rule 1143, Consumer Paint Thinner & Multi-Purpose Solvents and Rule 1144,...

  10. 76 FR 67396 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-01

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Placer County Air Pollution... proposing to approve revisions to the Placer County Air Pollution Control District (PCAPCD) and Sacramento Metro Air Quality Management District (SMAQMD) portions of the California State Implementation Plan...

  11. 78 FR 19128 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Particulate Matter Standards

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-29

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Ohio; Particulate... is taking direct final action to convert a conditional approval of specified provisions of the Ohio state implementation plan (SIP) to a full approval. Ohio submitted a request to approve...

  12. 78 FR 19164 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Particulate Matter Standards

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-29

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Ohio; Particulate... proposing to convert a conditional approval of specified provisions of the Ohio state implementation plan (SIP) to a full approval. Ohio submitted a request to approve a section of its particulate matter...

  13. 77 FR 70121 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; PBR and PTIO

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-23

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Ohio; PBR and PTIO..., 2012 direct final rule approving a revision to the Ohio State Implementation Plan (SIP). EPA will... Install (PTI) requirement and a general permit program as additions to Ohio's SIP. After publication...

  14. 78 FR 69337 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Ohio SO2

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-19

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Ohio; Ohio SO2 Air... June 24, 2011, Ohio Environmental Protection Agency submitted for Clean Air Act State Implementation Plan (SIP) approval, revisions to Ohio Administrative Code (OAC) rules: 3745-18-01, 3745-18- 03 to...

  15. 76 FR 32321 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Revision to the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-06

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Revision to the Inspection and Maintenance (I/M) Program--Quality Assurance Protocol for the Safety... Implementation Plan (SIP). The revision consists of a change by the Commonwealth of Pennsylvania to the...

  16. 78 FR 52893 - Approval and Promulgation of Implementation Plans; State of Iowa

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-27

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; State of Iowa AGENCY... the State Implementation Plan (SIP) for the state of Iowa. The purpose of these revisions is to update... Iowa statewide rules previously approved by EPA and will ensure consistency between the...

  17. 40 CFR 52.823 - PM10 State Implementation Plan Development in Group II Areas.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Iowa § 52.823 PM10 State Implementation Plan Development in Group II Areas. The Iowa Department of Natural Resources..., dated October 28, 1988, Mr. Larry J. Wilson, Director, Iowa Department of Natural Resources,...

  18. 40 CFR 52.823 - PM10 State Implementation Plan Development in Group II Areas.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Iowa § 52.823 PM10 State Implementation Plan Development in Group II Areas. The Iowa Department of Natural Resources..., dated October 28, 1988, Mr. Larry J. Wilson, Director, Iowa Department of Natural Resources,...

  19. 40 CFR 52.823 - PM10 State Implementation Plan Development in Group II Areas.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Iowa § 52.823 PM10 State Implementation Plan Development in Group II Areas. The Iowa Department of Natural Resources..., dated October 28, 1988, Mr. Larry J. Wilson, Director, Iowa Department of Natural Resources,...

  20. 75 FR 38757 - Approval and Promulgation of Implementation Plans; State of Iowa

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-06

    ...; FRL-9170-5] Approval and Promulgation of Implementation Plans; State of Iowa AGENCY: Environmental... revision to the Iowa State Implementation Plan (SIP). The purpose of this revision is to update the Polk... updates to the Iowa statewide rules previously approved by EPA and will ensure consistency between...

  1. 40 CFR 52.823 - PM10 State Implementation Plan Development in Group II Areas.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Iowa § 52.823 PM10 State Implementation Plan Development in Group II Areas. The Iowa Department of Natural Resources..., dated October 28, 1988, Mr. Larry J. Wilson, Director, Iowa Department of Natural Resources,...

  2. 77 FR 46361 - Partial Approval and Disapproval of Air Quality Implementation Plans; Nevada; Infrastructure...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-03

    ... AGENCY 40 CFR Part 52 Partial Approval and Disapproval of Air Quality Implementation Plans; Nevada... Implementation Plan (SIP) revisions submitted by the State of Nevada to address the requirements of section 110(a... deficiencies identified in this proposal, and we stand ready to work with the State to develop a revised...

  3. 75 FR 65594 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Particulate Matter Standards

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-26

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Ohio; Particulate... revise the Ohio State Implementation Plan under the Clean Air Act. The State has submitted revisions to... approving only a portion of Rule 7, while not acting on the portion providing a partial exemption...

  4. 75 FR 70140 - Approval and Promulgation of Implementation Plans; New York Prevention of Significant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-17

    ... action to grant a partial approval to revisions of the New York State Implementation Plan (SIP) submitted... AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; New York Prevention of... issuing a partial approval, with the caveat that EPA is taking no action at this time on the...

  5. 77 FR 43018 - Partial Approval and Partial Disapproval of Air Quality Implementation Plans for Florida...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-23

    ... AGENCY 40 CFR Part 52 Partial Approval and Partial Disapproval of Air Quality Implementation Plans for... partially disapprove revisions to the State Implementation Plans (SIPs) for Florida, Mississippi, and South... enforcement'' of such NAAQS. Section 110(a)(2) includes a list of specific elements that `` ach such...

  6. 77 FR 61724 - Partial Approval and Partial Disapproval of Air Quality Implementation Plans for Florida...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-11

    ... AGENCY 40 CFR Part 52 Partial Approval and Partial Disapproval of Air Quality Implementation Plans for... partially disapprove revisions to the State Implementation Plans (SIPs) for Florida, Mississippi, and South... address the 2006 PM 2.5 NAAQS or any requirements related to that NAAQS. Today's partial disapproval...

  7. 78 FR 45869 - Approval and Promulgation of State Implementation Plans; State of Montana; Interstate Transport...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-30

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of State Implementation Plans; State of Montana... portions of a State Implementation Plan (SIP) submission from the State of Montana that are intended to... pollution abatement. These partial disapprovals will not trigger an obligation for EPA to promulgate...

  8. 40 CFR Appendix A to Subpart Eeee... - States With Approved State Implementation Plan Revisions Concerning Allocations

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Implementation Plan Revisions Concerning Allocations A Appendix A to Subpart EEEE of Part 97 Protection of.... EEEE, App. A Appendix A to Subpart EEEE of Part 97—States With Approved State Implementation Plan... Ozone Season allowances by the permitting authority under § 97.343(a): Indiana Louisiana Michigan...

  9. 75 FR 42672 - Approval and Promulgation of Implementation Plans; New Jersey; 8-hour Ozone Control Measures

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-22

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; New Jersey; 8- hour Ozone... Implementation Plan (SIP) for ozone involving the control of volatile organic compounds (VOCs). The proposed SIP... ozone. DATES: Comments must be received on or before August 23, 2010. ADDRESSES: Submit your...

  10. 77 FR 10341 - Revisions to Federal Implementation Plans To Reduce Interstate Transport of Fine Particulate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-21

    ... Implementation Plans To Reduce Interstate Transport of Fine Particulate Matter and Ozone; Final Rule and Proposed... Implementation Plans To Reduce Interstate Transport of Fine Particulate Matter and Ozone AGENCY: Environmental... Particulate Matter and Ozone and Correction of SIP Approvals published August 8, 2011). In the...

  11. 75 FR 48628 - Approval and Promulgation of Implementation Plans; State of Missouri

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-11

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; State of Missouri AGENCY... Missouri State Implementation Plan (SIP) submitted by the state on June 17, 2009. The purpose of these revisions is to rescind the rule More Restrictive Emission Limitations for Particulate Matter in South...

  12. 77 FR 47530 - Approval and Promulgation of State Implementation Plans; Hawaii; Infrastructure Requirements for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-09

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of State Implementation Plans; Hawaii; Infrastructure Requirements for the 1997 8-Hour Ozone and the 1997 and 2006 Fine Particulate Matter National Ambient Air... approving in part and disapproving in part a State Implementation Plan (SIP) revision submitted by the...

  13. 77 FR 43023 - Approval and Promulgation of Air Quality Implementation Plans; Connecticut, Maine, Massachusetts...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-23

    ... Implementation Plans; Connecticut, Maine, Massachusetts, New Hampshire; Infrastructure SIPs for the 1997 and 2006... each state's State Implementation Plan (SIP) meets the requirements of section 110(a) of the Clean Air... standards (NAAQS). Section 110(a) of the CAA requires that each state adopt and submit a SIP for...

  14. 75 FR 48627 - Approval and Promulgation of Air Quality Implementation Plans; Delaware; Administrative and Non...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-11

    ...; Administrative and Non-Substantive Changes to Existing Delaware SIP Regulations AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA proposes to approve the State Implementation Plan (SIP... Implementation Plan (SIP). In the Final Rules section of this Federal Register, EPA is approving the State's...

  15. 78 FR 59250 - Approval and Promulgation of Implementation Plans; Texas; Revisions to New Source Review (NSR...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-26

    ... Review (NSR) State Implementation Plan (SIP); Emergency Orders AGENCY: Environmental Protection Agency... Implementation Plan (SIP) for the State of Texas that relate to Emergency Orders. This includes portions of SIP..., February 1, 2006, and July 17, 2006 SIP revision submittals. These submittals include the initial...

  16. 78 FR 11984 - Approval and Promulgation of Implementation Plans; State of Hawaii; Update to Materials...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-21

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; State of Hawaii; Update to...; notice of administrative change. SUMMARY: EPA is updating the materials submitted by the State of Hawaii that are incorporated by reference (IBR) into the Hawaii State Implementation Plan (SIP)....

  17. 77 FR 27671 - State of Hawaii; Regional Haze Federal Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-11

    ... AGENCY 40 CFR Part 52 State of Hawaii; Regional Haze Federal Implementation Plan AGENCY: Environmental... Haze Federal Implementation Plan'', which will be posted on EPA's Web site by May 16, 2012. DATES: The... Haleakala National Park on Maui. Regional haze is visibility impairment caused by the cumulative...

  18. 76 FR 42557 - Approval and Promulgation of Air Quality Implementation Plans; Delaware; Regional Haze State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-19

    ... Haze State Implementation Plan AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is approving the Delaware Regional Haze Plan, a revision to the Delaware State Implementation... haze program. EPA is also approving this revision since it meets the requirements of...

  19. 76 FR 43963 - Regional Haze State Implementation Plan; State of Nevada; Extension of Comment Period

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-22

    ... AGENCY 40 CFR Part 51 Regional Haze State Implementation Plan; State of Nevada; Extension of Comment... (SIP) to implement the regional haze program for the first planning period through July 31, 2018. The EPA is extending the deadline for written comments on the proposed approval of the Regional Haze...

  20. 76 FR 66663 - Approval and Promulgation of Implementation Plans; Illinois; Consumer Products and AIM Rules

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-27

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; Illinois; Consumer Products and... architectural and industrial maintenance (AIM) coatings and incorporate this new rule into the State Implementation Plan (SIP) for the State of Illinois. However, there are four specific paragraphs in this...

  1. 76 FR 69214 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Consumer and Commercial...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-08

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Virginia; Consumer...: EPA is proposing to approve a State Implementation Plan (SIP) revision submitted by the Commonwealth..., architectural and industrial (AIM) coatings, adhesives and sealants, and asphalt paving operations within...

  2. 78 FR 26301 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; Consumer Products and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-06

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Illinois; Consumer... is proposing to approve a revision to the Illinois State Implementation Plan (SIP). This approval... language to clarify VOC limit applicability for architectural and industrial maintenance coatings into...

  3. 77 FR 33659 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; Consumer Products and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-07

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Illinois; Consumer... approving the addition of a new rule to the Illinois State Implementation Plan (SIP) submitted by the... more stringent than, EPA's national consumer products and architectural and industrial maintenance...

  4. 75 FR 82363 - Approval and Promulgation of Implementation Plans; Ohio; Volatile Organic Compound Emission...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-30

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; Ohio; Volatile Organic Compound... printing volatile organic compound (VOC) rule for approval into the Ohio State Implementation Plan (SIP..., Volatile organic compounds. Dated: December 17, 2010. Bharat Mathur, Acting Regional Administrator,...

  5. 77 FR 22497 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; Small Container...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-16

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Illinois; Small... final rule. SUMMARY: EPA is approving a revision to the Illinois State Implementation plan (SIP... proposed approval at 76 FR 74014). During that rulemaking the American Coatings Association (ACA)...

  6. 78 FR 23495 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; Small Container...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-19

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Illinois; Small.... SUMMARY: EPA is approving a revision to the Illinois State Implementation plan (SIP) submitted by the... rulemaking, the American Coatings Association (ACA) commented to Illinois EPA that many VOC...

  7. 75 FR 18757 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Alternate Monitoring...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-13

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Indiana; Alternate Monitoring Requirements for Indianapolis Power and Light--Harding Street Station AGENCY: Environmental... approve as ] a revision to its State Implementation Plan (SIP) alternative monitoring requirements for...

  8. 78 FR 63929 - Approval and Promulgation of Air Quality Implementation Plans; Texas; Revisions to Rules and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-25

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Texas; Revisions to Rules and Regulations for Control of Air Pollution; Permitting of Grandfathered Facilities AGENCY... of the Texas State Implementation Plan submitted by the Texas Commission on Environmental...

  9. 77 FR 71700 - Approval and Promulgation of Air Quality Implementation Plans; Delaware; Control of Stationary...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-04

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Delaware; Control of... Resources and Environmental Control (DNREC) State Implementation Plan (SIP). The revision amends Regulation... Natural Resources and Environmental Control, 89 Kings Highway, P.O. Box 1401, Dover, Delaware 19903....

  10. Perceived Use and Acceptance of Cloud Enterprise Resource Planning (ERP) Implementation in the Manufacturing Industries

    ERIC Educational Resources Information Center

    Adeboje, Adewale

    2015-01-01

    The purpose of this study was to gain an insight into perceived use and acceptance for implementing an enterprise resource planning system and the decision whether to contract out the enterprise resource planning (ERP) service to a cloud provider. Cloud-based ERP systems can provide many advantages to the normal implementation of the same systems…

  11. 77 FR 44560 - Revisions to the Nevada State Implementation Plan, Washoe County Air Quality District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-30

    ... AGENCY 40 CFR Part 52 Revisions to the Nevada State Implementation Plan, Washoe County Air Quality... approve revisions to the Washoe County District Board of Health (WCDBOH) portion of the Nevada State Implementation Plan (SIP) that EPA expects to be submitted by the Nevada Division of Environmental...

  12. Development of an Implementation Plan Related to Biological Opinion on Operation of the Federal Columbia River Power System ; Step 1: Review and Critique of Implementation Plans.

    SciTech Connect

    Neitzel, Duane A.; Bunn, Amoret

    2000-12-01

    The Draft Biological Opinion on Operation of the Federal Columbia River Power System calls for the development of 1- and 5-year implementation plans. These plans will provide the roadmap for planning and subsequent implementation of actions intended to meet specific performance standards (i.e., biological objectives) in a timely manner. To develop implementation plans the key tasks and sequences of steps must be determined. Those responsible for specific tasks must be identified and they must understand what they need to do. There must be assurances that the resources (human, physical, and fiscal) to complete the tasks are available. Motivation and incentive systems should be set up. Systems to coordinate efforts and guide activity must be devised and installed. An information management system must be designed to manage and analyze data and ensure that appropriate data are collected. This will aid managers in assessing whether individual activities or actions are tracking with stated goals and objectives. Training programs to improve managerial and worker capability in making and implementing plans should be designed. Managerial leadership to guide the efforts of all individuals in achieving the goals of the anadromous and resident fish recovery must be developed. It is the entire process of managing fish recovery in relationship to the Biological Opinion that will guide, coordinate, motivate, and control work and determine the effectiveness and efficiency of plan implementation.

  13. Strategic Planning: Contextual Factors that Facilitated and/or Challenged the Implementation of Strategic Planning in Two Nonprofit Organizations

    ERIC Educational Resources Information Center

    Masilamony, Davadhasan

    2010-01-01

    As the nonprofit sector continues to grow in size and importance in American society, successful organizations proactively initiate strategic planning so they can be more responsive to changing circumstances, underlying trends, and shifting demands. At times, however, organizations develop elaborate plans that are never implemented. Unfortunately,…

  14. Numerous strategies but limited implementation guidance in US local adaptation plans

    NASA Astrophysics Data System (ADS)

    Woodruff, Sierra C.; Stults, Missy

    2016-08-01

    Adaptation planning offers a promising approach for identifying and devising solutions to address local climate change impacts. Yet there is little empirical understanding of the content and quality of these plans. We use content analysis to evaluate 44 local adaptation plans in the United States and multivariate regression to examine how plan quality varies across communities. We find that plans draw on multiple data sources to analyse future climate impacts and include a breadth of strategies. Most plans, however, fail to prioritize impacts and strategies or provide detailed implementation processes, raising concerns about whether adaptation plans will translate into on-the-ground reductions in vulnerability. Our analysis also finds that plans authored by the planning department and those that engaged elected officials in the planning process were of higher quality. The results provide important insights for practitioners, policymakers and scientists wanting to improve local climate adaptation planning and action.

  15. 76 FR 77739 - Approval and Promulgation of Air Quality Implementation Plans; Massachusetts and New Hampshire...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-14

    ... comments to: Anne Arnold, Manager, Air Quality Planning Unit, Office of Ecosystem Protection, U.S... INFORMATION CONTACT: Richard P. Burkhart, Air Quality Planning Unit, U.S. Environmental Protection Agency, EPA... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Massachusetts...

  16. 40 CFR 52.1583 - Requirements for state implementation plan revisions relating to new motor vehicles.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PLANS (CONTINUED) New Jersey § 52.1583 Requirements for state implementation plan revisions relating to new motor vehicles. New Jersey must comply with the requirements of § 51.120. ... plan revisions relating to new motor vehicles. 52.1583 Section 52.1583 Protection of...

  17. 40 CFR 52.1583 - Requirements for state implementation plan revisions relating to new motor vehicles.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... PLANS (CONTINUED) New Jersey § 52.1583 Requirements for state implementation plan revisions relating to new motor vehicles. New Jersey must comply with the requirements of § 51.120. ... plan revisions relating to new motor vehicles. 52.1583 Section 52.1583 Protection of...

  18. 40 CFR 52.1583 - Requirements for state implementation plan revisions relating to new motor vehicles.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PLANS (CONTINUED) New Jersey § 52.1583 Requirements for state implementation plan revisions relating to new motor vehicles. New Jersey must comply with the requirements of § 51.120. ... plan revisions relating to new motor vehicles. 52.1583 Section 52.1583 Protection of...

  19. 40 CFR 52.1583 - Requirements for state implementation plan revisions relating to new motor vehicles.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... PLANS (CONTINUED) New Jersey § 52.1583 Requirements for state implementation plan revisions relating to new motor vehicles. New Jersey must comply with the requirements of § 51.120. ... plan revisions relating to new motor vehicles. 52.1583 Section 52.1583 Protection of...

  20. 40 CFR 52.1583 - Requirements for state implementation plan revisions relating to new motor vehicles.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... PLANS (CONTINUED) New Jersey § 52.1583 Requirements for state implementation plan revisions relating to new motor vehicles. New Jersey must comply with the requirements of § 51.120. ... plan revisions relating to new motor vehicles. 52.1583 Section 52.1583 Protection of...

  1. 78 FR 48318 - Approval and Promulgation of Air Quality Implementation Plans; Texas; Victoria County, 1997 8...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-08

    ... attainment inventory; (b) A maintenance demonstration; (c) Ambient air quality monitoring; (d) A contingency... County, 1997 8-Hour Ozone Section 110 (a)(1) Maintenance Plan AGENCY: Environmental Protection Agency... Texas State Implementation Plan (SIP). The submitted revisions include a maintenance plan for...

  2. High performance computing and communications: FY 1997 implementation plan

    SciTech Connect

    1996-12-01

    The High Performance Computing and Communications (HPCC) Program was formally authorized by passage, with bipartisan support, of the High-Performance Computing Act of 1991, signed on December 9, 1991. The original Program, in which eight Federal agencies participated, has now grown to twelve agencies. This Plan provides a detailed description of the agencies` FY 1996 HPCC accomplishments and FY 1997 HPCC plans. Section 3 of this Plan provides an overview of the HPCC Program. Section 4 contains more detailed definitions of the Program Component Areas, with an emphasis on the overall directions and milestones planned for each PCA. Appendix A provides a detailed look at HPCC Program activities within each agency.

  3. Used fuel disposition campaign international activities implementation plan.

    SciTech Connect

    Nutt, W. M.

    2011-06-29

    countries with more mature programs. The U.S. fuel cycle is a once through fuel cycle involving the direct disposal of UNF, as spent nuclear fuel, in a geologic repository (previously identified at Yucca Mountain, Nevada), following at most a few decades of storage (wet and dry). The geology at Yucca Mountain, unsaturated tuff, is unique among all countries investigating the disposal of UNF and HLW. The decision by the U.S. Department of Energy to no longer pursue the disposal of UNF at Yucca Mountain and possibly utilize very long term storage (approaching 100 years or more) while evaluating future fuel cycle alternatives for managing UNF, presents a different UNF and HLW management R&D portfolio that has been pursued in the U.S. In addition, the research and development activities managed by OCRWM have been transferred to DOE-NE. This requires a reconsideration of how the UFDC will engage in cooperative and collaborative activities with other countries. This report presents the UFDC implementation plan for international activities. The DOE Office of Civilian Radioactive Waste Management (OCRWM) has cooperated and collaborated with other countries in many different 'arenas' including the Nuclear Energy Agency (NEA) within the Organization for Economic Co-operation and Development (OECD), the International Atomic Energy Agency (IAEA), and through bilateral agreements with other countries. These international activities benefited OCRWM through the acquisition and exchange of information, database development, and peer reviews by experts from other countries. DOE-NE cooperates and collaborates with other countries in similar 'arenas' with similar objectives and realizing similar benefits. However the DOE-NE focus has not typically been in the area of UNF and HLW management. This report will first summarize these recent cooperative and collaborative activities. The manner that the UFDC will cooperate and collaborate in the future is expected to change as R&D is conducted

  4. 75 FR 54031 - Approval and Promulgation of Implementation Plans; Designation of Areas for Air Quality Planning...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-03

    ...; Designation of Areas for Air Quality Planning Purposes; State of California; PM-10; Redesignation of the Coso Junction Planning Area to Attainment; Approval of PM-10 Maintenance Plan for the Coso Junction Planning... State of California's request to redesignate the Coso Junction planning area (CJPA) to attainment...

  5. Individualized Career Plans: A Study of Implementation Needs.

    ERIC Educational Resources Information Center

    Piland, William E.

    1986-01-01

    Describes an Individualized Career Plan (ICP) as a practical, written action plan of career development activities designed to direct a student's formal and informal learning experiences toward identifying and achieving a career goal. Discusses a study of the levels of awareness of the ICP among Illinois community college staff. (AYC)

  6. 40 CFR 51.1002 - Submittal of State implementation plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... a PM2.5 attainment plan precursor and evaluate sources of VOC emissions in the State for control... that VOC emissions from sources in the State significantly contribute to PM2.5 concentrations in the... evaluate sources of PM2.5 direct emissions and PM2.5 attainment plan precursors in accordance with §§...

  7. 40 CFR 51.1002 - Submittal of State implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... a PM2.5 attainment plan precursor and evaluate sources of VOC emissions in the State for control... that VOC emissions from sources in the State significantly contribute to PM2.5 concentrations in the... evaluate sources of PM2.5 direct emissions and PM2.5 attainment plan precursors in accordance with §§...

  8. 40 CFR 51.1002 - Submittal of State implementation plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... a PM2.5 attainment plan precursor and evaluate sources of VOC emissions in the State for control... that VOC emissions from sources in the State significantly contribute to PM2.5 concentrations in the... evaluate sources of PM2.5 direct emissions and PM2.5 attainment plan precursors in accordance with §§...

  9. 40 CFR 51.1002 - Submittal of State implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... a PM2.5 attainment plan precursor and evaluate sources of VOC emissions in the State for control... that VOC emissions from sources in the State significantly contribute to PM2.5 concentrations in the... evaluate sources of PM2.5 direct emissions and PM2.5 attainment plan precursors in accordance with §§...

  10. Beyond the Diversity Crisis Model: Decentralized Diversity Planning and Implementation

    ERIC Educational Resources Information Center

    Williams, Damon A.

    2008-01-01

    This article critiques the diversity crises model of diversity planning in higher education and presents a decentralized diversity planning model. The model is based on interviews with the nation's leading diversity officers, a review of the literature and the authors own experiences leading diversity change initiatives in higher education. The…

  11. Implementing LCFF: Communicating about District Plans. Policy and Practice Brief

    ERIC Educational Resources Information Center

    Knudson, Joel

    2016-01-01

    California educators continue in their struggle to communicate district plans to parents, teachers, and other members of the school community. Local Control Accountability Plans (LCAPs), have ballooned into jargon-laden stacks of tables, impenetrable to all but the most sophisticated reader. Envisioned as a tool to improve transparency, the LCAP…

  12. 2004 Strategic Master Plan for Higher Education. Update on Implementation

    ERIC Educational Resources Information Center

    Washington Higher Education Coordinating Board, 2005

    2005-01-01

    The 2004 Strategic Master Plan for Higher Education identified clear and measurable goals that focused on outcomes rather than inputs alone. To reinforce this outcomes-based approach, the plan proposed that the state develop a new funding method to reward public colleges and universities for student success. Specifically, it proposed that the…

  13. Implementation of a chemical hygiene plan at an R&D facility

    SciTech Connect

    Kovach, J.J.

    1994-08-01

    Implementation of a Chemical Hygiene Plan at an R&D facility is accomplished in an integrated approach with other programs. While the laboratory standard specifies the requirements of a Chemical Hygiene Plan, implementation requires innovation and creativity to effectively comply with the standard and to support R&D activities. While the Chemical Hygiene Plan is a unique entity, it must be integrated with other programs (e.g., Hazard Communication Program, Hazardous Waste Management Program, and Waste Minimization Program) so that complementary activities can minimize duplication of effort. The Morgantown Energy Technology Center (METC) has implemented a Chemical Hygiene Plan using an integrated approach. The overall plan is described, and decisions on key issues and the criteria used to determine the implementation approach are discussed.

  14. 78 FR 54200 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Maintenance Plan Update...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-03

    ... Plan Update for Lake County, Indiana for Sulfur Dioxide AGENCY: Environmental Protection Agency (EPA..., Indiana sulfur dioxide (SO 2 ) maintenance area. This plan update demonstrates that Lake County...

  15. Strategic Planning, Implementation, and Evaluation Processes in Hospital Systems: A Survey From Iran

    PubMed Central

    Sadeghifar, Jamil; Jafari, Mehdi; Tofighi, Shahram; Ravaghi, Hamid; Maleki, Mohammad Reza

    2015-01-01

    Aim & Background: Strategic planning has been presented as an important management practice. However, evidence of its deployment in healthcare systems in low-income and middle-income countries (LMICs) is limited. This study investigated the strategic management process in Iranian hospitals. Methods: The present study was accomplished in 24 teaching hospitals in Tehran, Iran from September 2012 to March 2013. The data collection instrument was a questionnaire including 130 items. This questionnaire measured the situation of formulation, implementation, and evaluation of strategic plan as well as the requirements, facilitators, and its benefits in the studied hospitals. Results: All the investigated hospitals had a strategic plan. The obtained percentages for the items “the rate of the compliance to requirements” and “the quantity of planning facilitators” (68.75%), attention to the stakeholder participation in the planning (55.74%), attention to the planning components (62.22%), the status of evaluating strategic plan (59.94%) and the benefits of strategic planning for hospitals (65.15%) were in the medium limit. However, the status of implementation of the strategic plan (53.71%) was found to be weak. Significant statistical correlations were observed between the incentive for developing strategic plan and status of evaluating phase (P=0.04), and between status of implementation phase and having a documented strategic plan (P=0.03). Conclusion: According to the results, it seems that absence of appropriate internal incentive for formulating and implementing strategies led more hospitals to start formulation strategic planning in accordance with the legal requirements of Ministry of Health. Consequently, even though all the investigated hospital had the documented strategic plan, the plan has not been implemented efficiently and valid evaluation of results is yet to be achieved. PMID:25716385

  16. 77 FR 51739 - Approval and Promulgation of Implementation Plans; Tennessee; Regional Haze State Implementation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-27

    .... 4. Mail: EPA-R04-OAR-2009-0786, Regulatory Development Section, Air Planning Branch, Air, Pesticides... Section, Air Planning Branch, Air, Pesticides and Toxics Management Division, U.S. Environmental... Development Section, Air Planning Branch, Air, Pesticides and Toxics Management Division, U.S....

  17. Communications and Information: Base-Level Planning and Implementation

    DTIC Science & Technology

    2007-11-02

    Installation Records ( CSIR ). 2.2.3. Promptly identifies what kind of communications and information systems the users need based on current base infrastructure...Blueprint, CSIRs , and communications and information strategic plans. 2.2.5. Participates in planning forums, briefings, conferences, and meetings (e.g...and the base Com- munications and Information Systems Blueprint. 3.5.2.2. Establishes and maintains CSIR files containing historical documents

  18. Evaluating an Integrated Support Model for Increasing Treatment Plan Implementation Following Consultation in Schools.

    PubMed

    Noell, George H; Volz, Jennifer R; Henderson, Marie Y; Williams, Kashunda L

    2017-02-20

    This study examined the percentage of steps implemented from treatment plans following consultation with teachers. Interventions were implemented for 39 elementary school students referred for consultation and treatment for challenging behavior or academic deficits. An integrated support model that included antecedent social influence and planning combined with follow-up performance feedback was compared to weekly structured follow-up interviews. Participating teacher-student dyads were randomly assigned to conditions. Integrated support produced superior treatment implementation and child outcomes compared to weekly follow-up meetings. In contrast, teachers' ratings of consultants' effectiveness, treatment acceptability, and treatment implementation were undifferentiated across conditions. Treatment plan implementation and child behavioral outcomes were statistically significantly correlated. Treatment acceptability and implementation were not correlated at a statistically significant level. The implications of these findings for consultation and treatment research and practice are discussed. (PsycINFO Database Record

  19. Implementation intentions for buying, carrying, discussing and using condoms: the role of the quality of plans.

    PubMed

    de Vet, Emely; Gebhardt, Winifred Anne; Sinnige, Judith; Van Puffelen, Anne; Van Lettow, Britt; de Wit, John B F

    2011-06-01

    Forming implementation intentions (i.e. action plans that specify when, where and how a person will act) could be effective in promoting condom use on a large scale. However, the technique implies that people are able to form high quality implementation plans that are likely to induce behaviour change. Young single females, aged 16-30 years old, were asked to form either an implementation intention for the target behaviour using condoms (n = 159) or preparatory implementation intentions for buying, carrying, discussing and using condoms (n = 146). Condom preparations were assessed at follow-up 2 months later. The implementation intentions that participants formed were rated on quality. In general, it appeared hard for young women to form high quality general implementation intentions for the target behaviour condom use. Implementation intentions for the preparatory behaviours were of better quality than general implementation intentions. Females who formed strong implementation intentions in the preparatory behaviours condition were more committed to these plans and perceived them as more useful. Plan commitment and perceived usefulness predicted condom preparations at follow-up. We conclude that it is important to ask individuals to form implementation intentions for the preparatory behaviours rather than for the target behaviour alone.

  20. Infrastructure State Implementation Plan (SIP) Requirements and Guidance

    EPA Pesticide Factsheets

    The Clean Air Act requires states to submit SIPs that implement, maintain, and enforce a new or revised national ambient air quality standard (NAAQS) within 3 years of EPA issuing the standard. The Infrastructure SIP is required for all states.

  1. Creating an IPE infusion plan: from foundation to implementation.

    PubMed

    Pinto Zipp, Genevieve; Maher, Catherine; LaFountaine, Michael; Rizzolo, Denise; Dayalu, Vikram; Goeckel, Carolyn; Torcivia, Elizabeth; Phillips, H James

    2014-01-01

    Today's health care system has embraced the model of collaborative interprofessional efforts among health care professionals to achieve desired patient health outcomes. The Academy can offer the foundational experiences needed to support and develop interprofessional patient-centered plans of care for health professional students. This paper explores one institution's approach to the creation of an infusion plan which the authors have termed a "structured immersion approach" (SIA) to interprofessional education (IPE). The SIA supports "Core Signature IPE" experiences within existing silo-based curriculums that allow for interprofessional education experiences and the appreciation of the importance of interprofessional practice in today's health care.

  2. 75 FR 14077 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; NOX

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-24

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Illinois; NO X... INFORMATION CONTACT: John Summerhays, Environmental Scientist, Criteria Pollutant Section, Air Programs...

  3. 78 FR 10589 - Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-14

    ... AGENCY 40 CFR Part 52 Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality Management District; Stationary Source Permits AGENCY: Environmental Protection Agency... by California as a revision to the Sacramento Metropolitan Air Quality Management District (SMAQMD...

  4. 78 FR 21540 - Revisions to the California State Implementation Plan, Butte County Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Butte County Air Quality Management District and Sacramento Metropolitan Air Quality Management District AGENCY: Environmental... revisions to the Butte County Air Quality Management District (BCAQMD) and Sacramento Metropolitan...

  5. 75 FR 40762 - Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-14

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality Management District and South Coast Air Quality Management District AGENCY: Environmental... Sacramento Metropolitan Air Quality Management District (SMAQMD) and South Coast Air Quality...

  6. 78 FR 21582 - Revisions to the California State Implementation Plan, Butte County Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Butte County Air Quality Management District and Sacramento Metropolitan Air Quality Management District AGENCY: Environmental... County Air Quality Management District (BCAQMD) and Sacramento Metropolitan Air Quality...

  7. 78 FR 53270 - Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-29

    ... AGENCY 40 CFR Part 52 Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality Management District; Stationary Source Permits AGENCY: Environmental Protection Agency... permitting rules submitted by California as a revision to the Sacramento Metropolitan Air Quality...

  8. 75 FR 5514 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-03

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Indiana; Correction... INFORMATION CONTACT: Christos Panos, Environmental Engineer, Criteria Pollutant Section, Air Programs...

  9. North Coast Unified Air Quality Management District, California; Final Limited Federal Implementation Plan

    EPA Pesticide Factsheets

    EPA is finalizing a limited Federal Implementation Plan (FIP) under the Clean Air Act (CAA or Act) to apply to the North Coast Unified Air Quality Management District (North Coast Unified AQMD or District) in California.

  10. 75 FR 23640 - Approval and Promulgation of Implementation Plans; New York Reasonably Available Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-04

    ... Control Technology and Reasonably Available Control Measures AGENCY: Environmental Protection Agency (EPA... control measure analysis and New York's efforts to meet the reasonably available control technology... inclusion in the State Implementation Plan and made additional commitments to meet the remaining...

  11. 78 FR 35319 - Solicitation for a Cooperative Agreement-Curriculum Development: Planning and Implementing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-12

    ...: Planning and Implementing Effective Mental Health Services in Jails AGENCY: National Institute of... Instructional Theory Into Practice (ITIP) model, to train participants in the purpose, functions, and... of mental illness. The awardee will produce a program description (overview), detailed...

  12. Guidance for 1-Hour Sulfur Dioxide (SO2) Nonattainment Area State Implementation Plans (SIP) Submissions

    EPA Pesticide Factsheets

    The document is intended to provide guidance and recommendations to state, local and tribal governments for the development of SIPs and tribal implementation plans (TIPs) under the 2010 1-hour primary NAAQS for Sulfur Dioxide (SO2).

  13. 77 FR 73005 - Revisions to the California State Implementation Plan, Imperial County, Placer County, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-07

    ... County, and Ventura County Air Pollution Control Districts AGENCY: Environmental Protection Agency (EPA... Pollution Control District (ICAPCD), Placer County Air Pollution Control District (PCAPCD) and Ventura County Air Pollution Control District (PCAPCD) portions of the California State Implementation Plan...

  14. 40 CFR 49.9960 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....137Rule for air pollution episodes. (l) Section 49.138Rule for the registration of air pollution sources... AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for...

  15. 78 FR 48323 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Update of the Motor...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-08

    ... electronic docket are listed in the www.regulations.gov index. Although listed in the index, some information...--APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS 0 1. The authority citation for part 52 continues to...

  16. 78 FR 45457 - Approval and Promulgation of State Implementation Plans; State of North Dakota; Interstate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-29

    ... site. Although listed in the index, some information is not publicly available, e.g., Confidential... follows: PART 52--APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS 0 1. The authority citation for...

  17. Implementation Plan for Chemical Industry R&D Roadmap for Nanomaterials by Design

    SciTech Connect

    none,

    2006-04-01

    The purpose of this effort is to develop an implementation plan to realize the vision and goals identified in the Chemical Industry R&D Roadmap for Nanomaterials By Design: From Fundamentals to Function.

  18. Preparation, review, and approval of implementation plans for nuclear safety requirements

    SciTech Connect

    Not Available

    1994-10-01

    This standard describes an acceptable method to prepare, review, and approve implementation plans for DOE Nuclear Safety requirements. DOE requirements are identified in DOE Rules, Orders, Notices, Immediate Action Directives, and Manuals.

  19. 76 FR 68698 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Revision to Nitrogen...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-07

    ...- 9487-7] Approval and Promulgation of Air Quality Implementation Plans; Virginia; Revision to Nitrogen... Commonwealth of Virginia that revises regulatory language that inadvertently ended its nitrogen oxides (NO...

  20. 78 FR 30208 - Approval and Promulgation of Air Quality Implementation Plans; Wisconsin; Prevention of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-22

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Wisconsin; Prevention of Significant Deterioration Greenhouse Gas Tailoring and Biomass Deferral Rule...