Science.gov

Sample records for 100-b-18 184-b powerhouse

  1. Remaining Sites Verification Package for the 100-B-18, 184-B Powerhouse Debris Pile, Waste Site Reclassification Form 2007-020

    SciTech Connect

    L. M. Dittmer

    2007-11-30

    The 100-B-18 Powerhouse Debris Pile contained miscellaneous demolition waste from the decommissioning activities of the 184-B Powerhouse. The debris covered an area roughly 15 m by 30 m and included materials such as concrete blocks, mixed aggregate/concrete slabs, stone rubble, asphalt rubble, traces of tar/coal, broken fluorescent lights, brick chimney remnants, and rubber hoses. In accordance with this evaluation, the verification sampling results support a reclassification of this site to Interim Closed Out. The results of verification sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River.

  2. TMEM184b Promotes Axon Degeneration and Neuromuscular Junction Maintenance

    PubMed Central

    Geisler, Stefanie; Pittman, Sara K.; Doan, Ryan A.; Weihl, Conrad C.; Milbrandt, Jeffrey; DiAntonio, Aaron

    2016-01-01

    Complex nervous systems achieve proper connectivity during development and must maintain these connections throughout life. The processes of axon and synaptic maintenance and axon degeneration after injury are jointly controlled by a number of proteins within neurons, including ubiquitin ligases and mitogen activated protein kinases. However, our understanding of these molecular cascades is incomplete. Here we describe the phenotype resulting from mutation of TMEM184b, a protein identified in a screen for axon degeneration mediators. TMEM184b is highly expressed in the mouse nervous system and is found in recycling endosomes in neuronal cell bodies and axons. Disruption of TMEM184b expression results in prolonged maintenance of peripheral axons following nerve injury, demonstrating a role for TMEM184b in axon degeneration. In contrast to this protective phenotype in axons, uninjured mutant mice have anatomical and functional impairments in the peripheral nervous system. Loss of TMEM184b causes swellings at neuromuscular junctions that become more numerous with age, demonstrating that TMEM184b is critical for the maintenance of synaptic architecture. These swellings contain abnormal multivesicular structures similar to those seen in patients with neurodegenerative disorders. Mutant animals also show abnormal sensory terminal morphology. TMEM184b mutant animals are deficient on the inverted screen test, illustrating a role for TMEM184b in sensory-motor function. Overall, we have identified an important function for TMEM184b in peripheral nerve terminal structure, function, and the axon degeneration pathway. SIGNIFICANCE STATEMENT Our work has identified both neuroprotective and neurodegenerative roles for a previously undescribed protein, TMEM184b. TMEM184b mutation causes delayed axon degeneration following peripheral nerve injury, indicating that it participates in the degeneration process. Simultaneously, TMEM184b mutation causes progressive structural

  3. 4. POWERHOUSE, GROUND LEVEL, GENERATOR AND EXCITER LOCATED IN POWERHOUSE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. POWERHOUSE, GROUND LEVEL, GENERATOR AND EXCITER LOCATED IN POWERHOUSE AT GROUND LEVEL LOOKING NORTHEAST - Dayville Mills Hydroelectric Facility, Powerhouse, North side of Route 101, .5 mile west of Route 395, Killingly Center, Windham County, CT

  4. Remaining Sites Verification Package for the 126-B-3, 184-B Coal Pit Dumping Area, Waste Site Reclassification Form 2005-028

    SciTech Connect

    L. M. Dittmer

    2006-08-07

    The 126-B-3 waste site is the former coal storage pit for the 184-B Powerhouse. During demolition operations in the 1970s, the site was used for disposal of demolition debris from 100-B/C Area facilities. The site has been remediated by removing debris and contaminated soils. The results of verification sampling demonstrated that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also showed that residual contaminant concentrations are protective of groundwater and the Columbia River.

  5. 38. 8 sisters and powerhouse, pulverizer building for powerhouse, coal ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    38. 8 sisters and powerhouse, pulverizer building for powerhouse, coal conveyor, blast stoves, "A" furnace, stoves, "B" furnace, stoves, "C" furnace, bottle cars. Looking south - Rouge Steel Company, 3001 Miller Road, Dearborn, MI

  6. 284-E Powerhouse trench engineering study

    SciTech Connect

    Crane, A.F.

    1997-01-20

    This document provides the basis for future use of the 284-E Powerhouse Trench as a transport conduit for effluents discharged from the 284-E Powerhouse in accordance with the requirements of the State Waste Discharge Permit, ST 4502.

  7. 24. The 184B Power House under construction, viewed to the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    24. The 184-B Power House under construction, viewed to the northeast in March 1944. The sewer line exiting to the Columbia river was used mainly for effluents from back-washing the filter basins. A separate Process Sewer Line (out of the picture to the right) for cooling water leaving the pile went to the 107-B Retention Basin, and ultimately to the river. P-1881 - B Reactor, Richland, Benton County, WA

  8. 1921 POWERHOUSE, EAST AND NORTH ELEVATIONS, VERTICAL VIEW; FACING WESTSOUTHWEST ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1921 POWERHOUSE, EAST AND NORTH ELEVATIONS, VERTICAL VIEW; FACING WEST-SOUTHWEST - Shoshone Falls Hydroelectric Project, 1921 Powerhouse, North Bank of Snake River, Tipperary Corner, Jerome County, ID

  9. 8. FIRST FLOOR POWERHOUSE SPACE. VIEW TO NORTH. Commercial ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. FIRST FLOOR POWERHOUSE SPACE. VIEW TO NORTH. - Commercial & Industrial Buildings, Key City Electric Street Railroad, Powerhouse & Storage Barn, Eighth & Washington Streets, Dubuque, Dubuque County, IA

  10. 9. POWERHOUSE, LOWER LEVEL, LOOKING NORTHWEST, PRESSURE CASE WHICH CONTAINS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. POWERHOUSE, LOWER LEVEL, LOOKING NORTHWEST, PRESSURE CASE WHICH CONTAINS THE WATER TURBINE - Dayville Mills Hydroelectric Facility, Powerhouse, North side of Route 101, .5 mile west of Route 395, Killingly Center, Windham County, CT

  11. 13. WEST ELEVATION, POWERHOUSE, WITH FIGURES AND AUTOMOBILES Historic photograph ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. WEST ELEVATION, POWERHOUSE, WITH FIGURES AND AUTOMOBILES Historic photograph no. 1646, no date, held at Media Arts and Services Department, Pacific Gas & Electric Co., San Francisco, CA. - Centerville Hydroelectric System, Powerhouse, Butte Creek, Centerville, Butte County, CA

  12. 5. ROSS POWERHOUSE: SAME CAMERA STATION AS ABOVE PHOTO BUT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. ROSS POWERHOUSE: SAME CAMERA STATION AS ABOVE PHOTO BUT LOOKING EAST. NOTE INFORMATION DISPLAY FOR TOURISTS AT FLOOR LEVEL, 1987. - Skagit Power Development, Ross Powerhouse, On Skagit River, 10.7 miles upstream from Newhalem, Newhalem, Whatcom County, WA

  13. 3. VIEW EAST, DETAIL WEST FRONT OF HYDROELECTRIC POWERHOUSE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. VIEW EAST, DETAIL WEST FRONT OF HYDROELECTRIC POWERHOUSE - Dayville Mills Hydroelectric Facility, Powerhouse, North side of Route 101, .5 mile west of Route 395, Killingly Center, Windham County, CT

  14. 1. WEST FRONT OF HYDROELECTRIC POWERHOUSE WITH INTAKE STRUCTURE, CANAL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. WEST FRONT OF HYDROELECTRIC POWERHOUSE WITH INTAKE STRUCTURE, CANAL SPILLWAY AT LEFT CENTER, VIEW EAST - Dayville Mills Hydroelectric Facility, Powerhouse, North side of Route 101, .5 mile west of Route 395, Killingly Center, Windham County, CT

  15. 6. POWERHOUSE, GENERATOR AND GOVERNOR LOCATED AT GROUND LEVEL LOOKING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. POWERHOUSE, GENERATOR AND GOVERNOR LOCATED AT GROUND LEVEL LOOKING NORTHWEST - Dayville Mills Hydroelectric Facility, Powerhouse, North side of Route 101, .5 mile west of Route 395, Killingly Center, Windham County, CT

  16. 6. VIEW FROM THE ROOF OF GORGE POWERHOUSE LOOKING EAST ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. VIEW FROM THE ROOF OF GORGE POWERHOUSE LOOKING EAST TO THE FORMER GRAVITY OIL STORAGE BUILDING, 1989. - Skagit Power Development, Gorge Powerhouse, On Skagit River, 0.4 mile upstream from Newhalem, Newhalem, Whatcom County, WA

  17. 35. EAST FRONT OF POWERHOUSE AND CAR BARN: East front ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    35. EAST FRONT OF POWERHOUSE AND CAR BARN: East front of powerhouse and car barn. 'Annex' is right end of building. - San Francisco Cable Railway, Washington & Mason Streets, San Francisco, San Francisco County, CA

  18. View of Irving Powerhouse. Looking across Fossil Creek (westsouthwest) ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of Irving Powerhouse. Looking across Fossil Creek (west-southwest) - Childs-Irving Hydroelectric Project, Irving System, Irving Powerhouse, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ

  19. Dam located to east of powerhouse, view from south. This ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Dam located to east of powerhouse, view from south. This dam holds back the waters of the Chattahoochee River to form the mill pond north of Riverdale Cotton Mill - Riverdale Cotton Mill, Powerhouse & Dam, Valley, Chambers County, AL

  20. View of powerhouse and dam from third floor of original ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of powerhouse and dam from third floor of original section of Langdale Cotton Mill, looking northeast - Langdale Cotton Mill, Powerhouse & Dam, 5910 Nineteenth Avenue, Valley, Chambers County, AL

  1. 33. DETAIL INTERIOR VIEW OF LEVEL +55 IN POWERHOUSE #1, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    33. DETAIL INTERIOR VIEW OF LEVEL +55 IN POWERHOUSE #1, SHOWING TURBINE/GENERATOR CONTROL PANEL FOR TURBINE/GENERATOR UNIT NO 1. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  2. TAILRACE, WITH POWERHOUSES (SOUTH ELEVATIONS), VERTICAL VIEW; FACING NORTHEAST ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    TAILRACE, WITH POWERHOUSES (SOUTH ELEVATIONS), VERTICAL VIEW; FACING NORTHEAST - Shoshone Falls Hydroelectric Project, Tailrace, North Bank of Snake River, South side of powerhouse complex, Tipperary Corner, Jerome County, ID

  3. SKIDWAY AND WEST ELEVATION OF 1921 POWERHOUSE, GROUND FLOOR ENTRY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    SKIDWAY AND WEST ELEVATION OF 1921 POWERHOUSE, GROUND FLOOR ENTRY AT LOWER RIGHT, VERTICAL VIEW; FACING NORTHEAST - Shoshone Falls Hydroelectric Project, Skidway, North Bank of Snake River, immediately North/Northeast of the 1921 Powerhouse, Tipperary Corner, Jerome County, ID

  4. 18. ROSS POWERHOUSE: BUTTERFLY VALVE FROM BELOW AND SCROLL CASE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. ROSS POWERHOUSE: BUTTERFLY VALVE FROM BELOW AND SCROLL CASE DRAIN. TAG INDICATES THE SCROLL CASE DRAIN WAS OPEN, 1989. - Skagit Power Development, Ross Powerhouse, On Skagit River, 10.7 miles upstream from Newhalem, Newhalem, Whatcom County, WA

  5. 8. DETAIL: GENERATOR FLOOR DIABLO POWERHOUSE SHOWING BUTTERFLY VALVE CONTROL, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. DETAIL: GENERATOR FLOOR DIABLO POWERHOUSE SHOWING BUTTERFLY VALVE CONTROL, MOSAIC TILE FLOOR, AS SEEN FROM VISITORS GALLERY, 1989. - Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 miles upstream from Newhalem, Newhalem, Whatcom County, WA

  6. 9. BUTTERFLY VALVE CONTROL DIABLO POWERHOUSE. BUTTERFLY VALVES WERE MANUFACTURED ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. BUTTERFLY VALVE CONTROL DIABLO POWERHOUSE. BUTTERFLY VALVES WERE MANUFACTURED BY THE PELTON WATER WHEEL COMPANY IN 1931, 1989. - Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 miles upstream from Newhalem, Newhalem, Whatcom County, WA

  7. 20. ROSS POWERHOUSE: BUTTERFLY VALVE AS SEEN FROM INSIDE THE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. ROSS POWERHOUSE: BUTTERFLY VALVE AS SEEN FROM INSIDE THE SCROLL CASE, 1987. - Skagit Power Development, Ross Powerhouse, On Skagit River, 10.7 miles upstream from Newhalem, Newhalem, Whatcom County, WA

  8. 4. ANODIZED ALUMINUM WATER FOUNTAIN, DIABLO POWERHOUSE, CUSTOMMADE FOR THE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. ANODIZED ALUMINUM WATER FOUNTAIN, DIABLO POWERHOUSE, CUSTOM-MADE FOR THE VISITORS LOBBY, 1989. - Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 miles upstream from Newhalem, Newhalem, Whatcom County, WA

  9. 12. POWERHOUSE INTERIOR SHOWING EXCITER No. 2 SMALL PELTONDOBLE IMPULSE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. POWERHOUSE INTERIOR SHOWING EXCITER No. 2 SMALL PELTON-DOBLE IMPULSE WHEEL, HAND-CONTROLLED GATE VALVE, AND NOZZLE. VIEW TO SOUTHWEST. - Rush Creek Hydroelectric System, Powerhouse Exciters, Rush Creek, June Lake, Mono County, CA

  10. 6. POWERHOUSE INTERIOR SHOWING EXCITER No. 1. HANDCONTROLLED GATE VALVE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. POWERHOUSE INTERIOR SHOWING EXCITER No. 1. HAND-CONTROLLED GATE VALVE SHOWN ON NOZZLE TO PELTON-DOBLE IMPULSE WHEEL. VIEW TO NORTHEAST. - Rush Creek Hydroelectric System, Powerhouse Exciters, Rush Creek, June Lake, Mono County, CA

  11. 19. LOWER OIL ROOM DIABLO POWERHOUSE: SHARPLES OIL CENTRIFUGE AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. LOWER OIL ROOM DIABLO POWERHOUSE: SHARPLES OIL CENTRIFUGE AND OIL TANK, 1989. - Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 miles upstream from Newhalem, Newhalem, Whatcom County, WA

  12. 10. POWERHOUSE INTERIOR, DETAIL OF EXCITER No. 2 GENERAL ELECTRIC ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. POWERHOUSE INTERIOR, DETAIL OF EXCITER No. 2 GENERAL ELECTRIC GENERATOR SHOWING CABLING FROM ARMATURE TO COMMUTATOR. VIEW TO NORTHEAST. - Rush Creek Hydroelectric System, Powerhouse Exciters, Rush Creek, June Lake, Mono County, CA

  13. 11. POWERHOUSE INTERIOR, DETAIL OF EXCITER No. 2 GENERAL ELECTRIC ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. POWERHOUSE INTERIOR, DETAIL OF EXCITER No. 2 GENERAL ELECTRIC GENERATOR SHOWING COPPER COMMUTATOR AND CARBON BRUSHES. VIEW TO NORTHEAST. - Rush Creek Hydroelectric System, Powerhouse Exciters, Rush Creek, June Lake, Mono County, CA

  14. 13. POWERHOUSE INTERIOR, DETAIL OF EXCITER No. 2 GENERAL ELECTRIC ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. POWERHOUSE INTERIOR, DETAIL OF EXCITER No. 2 GENERAL ELECTRIC INDUCTION MOTOR NAMEPLATE. VIEW TO EAST. - Rush Creek Hydroelectric System, Powerhouse Exciters, Rush Creek, June Lake, Mono County, CA

  15. 14. POWERHOUSE INTERIOR, EXCITER No. 2 SHOWING GENERAL ELECTRIC INDUCTION ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. POWERHOUSE INTERIOR, EXCITER No. 2 SHOWING GENERAL ELECTRIC INDUCTION MOTOR IN SERIES BETWEEN PELTON-DOBLE IMPULSE WHEEL AND GENERAL ELECTRIC GENERATOR. VIEW TO EAST. - Rush Creek Hydroelectric System, Powerhouse Exciters, Rush Creek, June Lake, Mono County, CA

  16. 4. INTERIOR OF POWERHOUSE GENERATOR ROOM SHOWING GENERATOR UNITS AT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. INTERIOR OF POWERHOUSE GENERATOR ROOM SHOWING GENERATOR UNITS AT FOREGROUND RIGHT, GOVERNORS AND CONTROL VALVES AT LEFT, AND EXCITERS AT BACK LEFT. VIEW TO NORTH. - Rush Creek Hydroelectric System, Powerhouse Exciters, Rush Creek, June Lake, Mono County, CA

  17. 1. CONTEXT VIEW OF POWERHOUSE GENERATING FLOOR SHOWING ARRANGEMENT OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. CONTEXT VIEW OF POWERHOUSE GENERATING FLOOR SHOWING ARRANGEMENT OF GOVERNANCE EQUIPMENT IN FRONT OF GENERATORS AT UNIT 2 (FOREGROUND) AND UNIT 3 (BACKGROUND). VIEW TO SOUTH-SOUTHWEST. - Black Eagle Hydroelectric Facility, Powerhouse, Great Falls, Cascade County, MT

  18. View of north wall (electrical panel), interior of Childs Powerhouse. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of north wall (electrical panel), interior of Childs Powerhouse. Looking east - Childs-Irving Hydroelectric Project, Childs System, Childs Powerhouse, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ

  19. View of Childs Powerhouse electrical panel and operator station. In ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of Childs Powerhouse electrical panel and operator station. In forground generator #2 and its exciter are visible. Looking north - Childs-Irving Hydroelectric Project, Childs System, Childs Powerhouse, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ

  20. View of west end of Childs Powerhouse, including transformer station ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of west end of Childs Powerhouse, including transformer station and associated sheds. Looking downstream (east) - Childs-Irving Hydroelectric Project, Childs System, Childs Powerhouse, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ

  1. 7. POWERHOUSE, FOREGROUND ON CEILING EXCITER FLATBELT PULLEYS, BACK RIGHT, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. POWERHOUSE, FOREGROUND ON CEILING EXCITER FLATBELT PULLEYS, BACK RIGHT, WOODEN PERSONAL FACILITY LOCATED IN POWERHOUSE LOWER LEVEL LOOKING SOUTH - Dayville Mills Hydroelectric Facility, Powerhouse, North side of Route 101, .5 mile west of Route 395, Killingly Center, Windham County, CT

  2. 5. POWERHOUSE, GROUND LEVEL, LOOKING SOUTHEAST GENERATOR, GOVERNOR, EXCITER AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. POWERHOUSE, GROUND LEVEL, LOOKING SOUTHEAST GENERATOR, GOVERNOR, EXCITER AND KILOWATT-HOUR RECORDER LOCATED IN POWERHOUSE AT GROUND LEVEL LOOKING SOUTHEAST - Dayville Mills Hydroelectric Facility, Powerhouse, North side of Route 101, .5 mile west of Route 395, Killingly Center, Windham County, CT

  3. 39. DIABLO POWERHOUSE: GRAVITY LUBRICATING OIL TANKS. THESE TANKS ARE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    39. DIABLO POWERHOUSE: GRAVITY LUBRICATING OIL TANKS. THESE TANKS ARE LOCATED AT ROOF LEVEL AT THE NORTHEAST REAR CORNER OF DIABLO POWERHOUSE, 1989. - Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 miles upstream from Newhalem, Newhalem, Whatcom County, WA

  4. 21. DIABLO POWERHOUSE: LOOKING AT THE TRUNION FOR THE BUTTERFLY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    21. DIABLO POWERHOUSE: LOOKING AT THE TRUNION FOR THE BUTTERFLY VALVE AND DRAIN FOR SCROLL CASE FOR UNIT 32. THESE ARE LOCATED ON THE SAME LEVEL IN THE POWERHOUSE AS THE LOWER OIL ROOM, 1989. - Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 miles upstream from Newhalem, Newhalem, Whatcom County, WA

  5. 4. NORTH EXTERIOR SIDE OF KERN RIVER No. 1 POWERHOUSE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. NORTH EXTERIOR SIDE OF KERN RIVER No. 1 POWERHOUSE BUILDING SHOWING TAILRACES FOR (LEFT TO RIGHT IN PHOTO) GENERATOR UNITS Nos. 4 AND 3, EXCITER No. 1, AND GENERATOR UNITS Nos. 2 AND 1. POWERHOUSE BUILDING NORTH EXIT DOOR IS IN CENTER OF WALL. VIEW TO SOUTHWEST. - Kern County No. 1 Hydroelectric System, Powerhouse Exciters, Kern River Canyon, Bakersfield, Kern County, CA

  6. State Waste Discharge Permit application: 200-W Powerhouse Ash Pit

    SciTech Connect

    Atencio, B.P.

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations; the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. This document constitutes the State Waste Discharge Permit application for the 200-W Powerhouse Ash Pit. The 200-W Powerhouse Ash Waste Water discharges to the 200-W Powerhouse Ash Pit via dedicated pipelines. The 200-W Powerhouse Ash Waste Water is the only discharge to the 200-W Powerhouse Ash Pit. The 200-W Powerhouse is a steam generation facility consisting of a coal-handling and preparation section and boilers.

  7. 15. OVERVIEW OF TULE RIVER POWERHOUSE FROM FLUME SECTION JUST ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. OVERVIEW OF TULE RIVER POWERHOUSE FROM FLUME SECTION JUST SOUTHEAST OF FOREBAY SHOWING BYPASSED SEGMENT OF OLD HIGHWAY 190 IN FRONT OF POWERHOUSE A PHOTO RIGHT CENTER. TAILRACE FROM POWERHOUSE DISCHARGES PROJECT WATER BACK INTO TULE RIVER MIDDLE FORK JUST OUT OF VIEW AT EXTREME LEFT OF PHOTO. VIEW TO SOUTHWEST. - Tule River Hydroelectric Project, Water Conveyance System, Middle Fork Tule River, Springville, Tulare County, CA

  8. 83. OVERVIEW OF PARTIALLY COMPLETED POWERHOUSE WITH TWO UNITS IN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    83. OVERVIEW OF PARTIALLY COMPLETED POWERHOUSE WITH TWO UNITS IN OPERATION, LOOKING UPSTREAM, Print No. 274, June 1904 - Electron Hydroelectric Project, Along Puyallup River, Electron, Pierce County, WA

  9. 9. North Plant, View of Canopied Loading Dock with Powerhouse ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. North Plant, View of Canopied Loading Dock with Powerhouse to Left, Looking Northwest - Atwater Kent Manufacturing Company, North Plant, 5000 Wissahickon Avenue, Philadelphia, Philadelphia County, PA

  10. 33. DIABLO POWERHOUSE: VOLTAGE REGULATOR FOR SPARE EXCITER. ORIGINAL EQUIPMENT, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    33. DIABLO POWERHOUSE: VOLTAGE REGULATOR FOR SPARE EXCITER. ORIGINAL EQUIPMENT, BALANCE BEAM TYPE REGULATOR WHICH IS POSSIBLY ONE OF THE LAST OF ITS TYPE IN WORKING SERVICE IN THE COUNTRY, 1989. - Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 miles upstream from Newhalem, Newhalem, Whatcom County, WA

  11. 18. SHEAR PIN, UNIT 24 GORGE POWERHOUSE. THE WICKET GATES ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. SHEAR PIN, UNIT 24 GORGE POWERHOUSE. THE WICKET GATES ON THE TURBINE ARE EACH EQUIPPED WITH A SHEAR PIN AND OIL PRESSURE GAUGE. IF A GATE JAMS, THE PIN SMEARS AND THE CHANGE IN OIL PRESSURE TRIGGERS AN ALARM, 1989. - Skagit Power Development, Gorge Powerhouse, On Skagit River, 0.4 mile upstream from Newhalem, Newhalem, Whatcom County, WA

  12. 8. POWERHOUSE, LOWER LEVEL, LEFT, GOVERNOR DRIVE MOTOR WITH BELT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. POWERHOUSE, LOWER LEVEL, LEFT, GOVERNOR DRIVE MOTOR WITH BELT ON RIGHT, HYDRAULIC PUMP WITH RESERVOIR TANK, STEAM HEAT PIPES ON BACK WALL LOOKING NORTHEAST - Dayville Mills Hydroelectric Facility, Powerhouse, North side of Route 101, .5 mile west of Route 395, Killingly Center, Windham County, CT

  13. 2. VIEW SOUTH, NORTH SIDE OF HYDROELECTRIC POWERHOUSE AT LEFT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. VIEW SOUTH, NORTH SIDE OF HYDROELECTRIC POWERHOUSE AT LEFT WITH BRIDGE OVER CANAL SPILLWAY IN FOREGROUND AND MILL COMPLEX IN BACKGROUND - Dayville Mills Hydroelectric Facility, Powerhouse, North side of Route 101, .5 mile west of Route 395, Killingly Center, Windham County, CT

  14. 92. View of east facade of powerhouse, showing rear door ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    92. View of east facade of powerhouse, showing rear door of the building; the steel tanks adjacent to the powerhouse are surge tanks, each penstock has two surge tanks; looking west. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power & Light Company, White River Hydroelectric Project, 600 North River Avenue, Dieringer, Pierce County, WA

  15. 18. LOWER OIL ROOM DIABLO POWERHOUSE: GRAVITY OIL PUMPS POWERED ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. LOWER OIL ROOM DIABLO POWERHOUSE: GRAVITY OIL PUMPS POWERED BY LINCOLN AC MOTORS ON THE RIGHT AND TURBINE AIR DRY APPARATUS ON THE LEFT, 1989. - Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 miles upstream from Newhalem, Newhalem, Whatcom County, WA

  16. 37. WEST REAR OF POWERHOUSE AND CAR BARN: West rear ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. WEST REAR OF POWERHOUSE AND CAR BARN: West rear of powerhouse and car barn, showing the turntable and tracks used to move cars in and out of the building's repair and storage area. - San Francisco Cable Railway, Washington & Mason Streets, San Francisco, San Francisco County, CA

  17. 9. INTERIOR OF KERN RIVER No. 1 POWERHOUSE BUILDING SHOWING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. INTERIOR OF KERN RIVER No. 1 POWERHOUSE BUILDING SHOWING EXCITER No 2. Ca. 1930 GENERAL ELECTRIC ALTERNATING CURRENT MOTOR REPLACEMENT FOR ALLIS-CHALMERS IMPULSE WHEEL IS VISIBLE ON RIGHT ALONG WITH COUPLING TO EXCITER SHAFT. VIEW TO NORTHWEST. - Kern County No. 1 Hydroelectric System, Powerhouse Exciters, Kern River Canyon, Bakersfield, Kern County, CA

  18. 27. DIABLO POWERHOUSE UPPER OIL ROOM: OBSOLETE WESTINGHOUSE DIELECTRIC OIL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    27. DIABLO POWERHOUSE UPPER OIL ROOM: OBSOLETE WESTINGHOUSE DIELECTRIC OIL TESTING SET. OIL IS USED AS AN INSULATOR IN TRANSFORMERS AND ITS CONDUCTIVITY USED TO BE TESTED USING EQUIPMENT SUCH AS THIS, 1989. - Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 miles upstream from Newhalem, Newhalem, Whatcom County, WA

  19. 23. VIEW TO NORTH OF UNITS 57, NEW POWERHOUSE GENERATOR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    23. VIEW TO NORTH OF UNITS 5-7, NEW POWERHOUSE GENERATOR FLOOR; HYBRID LOMBARD-WOODWARD GOVERNOR FOR UNIT 5 AT LOWER LEFT; GOVERNOR OIL PUMP AT LEFT CENTER - Trenton Falls Hydroelectric Station, Powerhouse & Substation, On west bank of West Canada Creek, along Trenton Falls Road, 1.25 miles north of New York Route 28, Trenton Falls, Oneida County, NY

  20. 17. ROSS POWERHOUSE: BUTTERFLY VALVE CONTROLS FOR UNIT 43. THE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. ROSS POWERHOUSE: BUTTERFLY VALVE CONTROLS FOR UNIT 43. THE BUTTERFLY VALVE LOCK INDICATES THE BUTTERFLY VALVE IS CLOSED AS UNIT 43 WAS SHUT DOWN FOR REPAIRS, 1989. - Skagit Power Development, Ross Powerhouse, On Skagit River, 10.7 miles upstream from Newhalem, Newhalem, Whatcom County, WA

  1. 4. VIEW NORTHEAST FROM ELEVATOR TOWER BRIDGE OF NEW POWERHOUSE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. VIEW NORTHEAST FROM ELEVATOR TOWER BRIDGE OF NEW POWERHOUSE ROOF WITH FRAMEWORK FOR WIRES (RIGHT), AND PENSTOCKS FROM TOP OF GORGE (LEFT) - Trenton Falls Hydroelectric Station, Powerhouse & Substation, On west bank of West Canada Creek, along Trenton Falls Road, 1.25 miles north of New York Route 28, Trenton Falls, Oneida County, NY

  2. 33. EAST FRONT AND SOUTH SIDE OF POWERHOUSE 1965: ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    33. EAST FRONT AND SOUTH SIDE OF POWERHOUSE - 1965: Photocopy of July 1965 photograph showing south side and east front of powerhouse and car barn. Note addition of the decorative canopy at the corner of the building. At this date the structure displayed a coat of light green paint. - San Francisco Cable Railway, Washington & Mason Streets, San Francisco, San Francisco County, CA

  3. 8. POWERHOUSE INTERIOR SHOWING EXCITER No. 1 IN FOREGROUND, EXCITER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. POWERHOUSE INTERIOR SHOWING EXCITER No. 1 IN FOREGROUND, EXCITER No. 2., AND GENERATOR UNITS BEHIND EXCITER No. 2 IN BACKGROUND. EXCITER No. 1 GENERATOR HAS A COVER OVER TOP HALF OF COMMUTATOR ELEMENT. VIEW TO NORTHWEST. - Rush Creek Hydroelectric System, Powerhouse Exciters, Rush Creek, June Lake, Mono County, CA

  4. 1. CONTEXT VIEW OF POWERHOUSE GENERATING FLOOR SHOWING ARRANGEMENT OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. CONTEXT VIEW OF POWERHOUSE GENERATING FLOOR SHOWING ARRANGEMENT OF GOVERNANCE EQUIPMENT IN FRONT OF GENERATORS WITH UNIT 1 IN FOREGROUND AND UNITS 2-6 IN BACKGROUND. VIEW TO THE SOUTH-SOUTHWEST. - Ryan Hydroelectric Facility, Powerhouse, On Missouri River, northeast of Great Falls, Great Falls, Cascade County, MT

  5. 2. CONTEXTUAL VIEW OF THE POST FALLS POWERHOUSE, WITH THE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. CONTEXTUAL VIEW OF THE POST FALLS POWERHOUSE, WITH THE MODERN SUBSTATION AND OLD SWITCHING BUILDING IN THE LEFT FOREGROUND AND THE POWER PLANT IN THE RIGHT FOREGROUND, LOOKING SOUTH. - Washington Water Power Company Post Falls Power Plant, Middle Channel Powerhouse & Dam, West of intersection of Spokane & Fourth Streets, Post Falls, Kootenai County, ID

  6. 1. CONTEXTUAL VIEW OF THE POST FALLS POWERHOUSE LOOKING DOWNSTREAM. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. CONTEXTUAL VIEW OF THE POST FALLS POWERHOUSE LOOKING DOWNSTREAM. POWER PLANT AND INTAKE GATES ARE IN THE LEFT FOREGROUND, AND THE ATTACHED 'OLD SWITCHING BUILDING' (NOW ABANDONED) IS IN THE RIGHT BACKGROUND, LOOKING NORTHWEST. - Washington Water Power Company Post Falls Power Plant, Middle Channel Powerhouse & Dam, West of intersection of Spokane & Fourth Streets, Post Falls, Kootenai County, ID

  7. 90. View of east facade of powerhouse, and abandoned lightning ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    90. View of east facade of powerhouse, and abandoned lightning arrester houses on hillside above powerhouse; looking west. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power & Light Company, White River Hydroelectric Project, 600 North River Avenue, Dieringer, Pierce County, WA

  8. 89. View of west and south facades of powerhouse, and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    89. View of west and south facades of powerhouse, and abandoned lightning arrester houses on hillside above powerhouse; looking north. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power & Light Company, White River Hydroelectric Project, 600 North River Avenue, Dieringer, Pierce County, WA

  9. 24. MITSUBISHI BIPLANE VALVE GORGE POWERHOUSE SEEN FROM THE SOUTH. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    24. MITSUBISHI BIPLANE VALVE GORGE POWERHOUSE SEEN FROM THE SOUTH. THE MITSUBISHI BIPLANE VALVES WERE INSTALLED IN 1980 AND REPLACED LARNER-JOHNSON NEEDLE VALVES ON UNITS 21, 22, AND 23, 1989. - Skagit Power Development, Gorge Powerhouse, On Skagit River, 0.4 mile upstream from Newhalem, Newhalem, Whatcom County, WA

  10. View looking out of the Irving Powerhouse showing the exiting ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View looking out of the Irving Powerhouse showing the exiting water flowing south into the inlet of the Childs System. Looking south - Childs-Irving Hydroelectric Project, Irving System, Irving Powerhouse, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ

  11. State Waste Discharge Permit application: 200-E Powerhouse Ash Pit

    SciTech Connect

    Atencio, B.P.

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations, the US Department and Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. This document constitutes the State Waste Discharge Permit application for the 200-E Powerhouse Ash Pit. The 200-E Powerhouse Ash Waste Water discharges to the 200-E Powerhouse Ash Pit via dedicated pipelines. The 200-E Ash Waste Water is the only discharge to the 200-E Powerhouse Ash Pit. The 200-E Powerhouse is a steam generation facility consisting of a coal-handling and preparation section and boilers.

  12. Coal fired powerhouse wastewater pressure filtration

    SciTech Connect

    Martin, H.L.; Diener, G.A.

    1994-05-01

    The Savannah River Site`s permit for construction of an industrial wastewater treatment facility to remove solids from the boiler blow-down and wet ash scrubber effluent of the A-Area coal fired powerhouse was rejected. Conventional clarification technology would not remove arsenic from the combined effluent sufficient to achieve human health criteria in the small receiving surface stream. Treatability studies demonstrated that an existing facility, which will no longer be needed for metal finishing wastewater, can very efficiently process the powerhouse wastewater to less than 35 {mu}g/L arsenic. Use of cationic and anionic polymers to flocculate both the wastewater and filter aid solids formed a ``bridged cake`` with exceptionally low resistance to flow. This will double the capacity of the Oberlin pressure filters with the Tyvek T-980 sub micron filter media. The affects of high sheer agitation and high temperature in the raw wastewater on the filtration process were also studied and adequate controls were demonstrated.

  13. OVERVIEW OF POWERHOUSES FROM SOUTH SIDE OF RIVER; FACING NORTH ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    OVERVIEW OF POWERHOUSES FROM SOUTH SIDE OF RIVER; FACING NORTH - Shoshone Falls Hydroelectric Project, Reservoir and Dam Complex, North Bank of Snake River, extreme Eastern end of the Shoshone Falls Hydroelectric Project, Tipperary Corner, Jerome County, ID

  14. Powerhouse east, north and west elevations and operating machinery, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Powerhouse - east, north and west elevations and operating machinery, battery storage building, and typical span of steel service bridge - Grand Valley Diversion Dam, Half a mile north of intersection of I-70 & Colorado State Route 65, Cameo, Mesa County, CO

  15. 8. Credit SHS. View of east elevation of powerhouse and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. Credit SHS. View of east elevation of powerhouse and water discharging from tailrace Note the absence of upper level windows on facade. Photo e. October 1901. - Battle Creek Hydroelectric System, Battle Creek & Tributaries, Red Bluff, Tehama County, CA

  16. Interior of Left Powerhouse showing the Whiting (Company's) "Tiger" crane ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Interior of Left Powerhouse showing the Whiting (Company's) "Tiger" crane with a capacity of 350 tons, looking west. Note the terrazzo floor below depicting a Francis turbine. - Columbia Basin Project, Grand Coulee Dam Powerplant Complex, Grand Coulee, Grant County, WA

  17. 6. PLANT 2 POWERHOUSE AND TRANSFORMER BUILDING. NOTE ABSENCE OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. PLANT 2 POWERHOUSE AND TRANSFORMER BUILDING. NOTE ABSENCE OF DIAMOND-SHAPED WINDOWS VISIBLE ON TRANSFORMER BUILDING IN PRE-1970 PHOTOGRAPHS. VIEW TO WEST. - Bishop Creek Hydroelectric System, Plant 2, Bishop Creek, Bishop, Inyo County, CA

  18. VIEW LOOKING NORTHEAST SHOWING A CORNER DETAIL OF THE POWERHOUSE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW LOOKING NORTHEAST SHOWING A CORNER DETAIL OF THE POWERHOUSE AND THE SOUTHERN SECTION OF THE DAM. - Wilson Dam & Hydroelectric Plant, Spanning Tennessee River at Wilson Dam Road (Route 133), Muscle Shoals, Colbert County, AL

  19. 2. FOREMAN'S HOUSE, SURGE TANK AND TOP OF POWERHOUSE. VIEW ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. FOREMAN'S HOUSE, SURGE TANK AND TOP OF POWERHOUSE. VIEW TO EAST-NORTHEAST. - Rainbow Hydroelectric Facility, On north bank of Missouri River 2 miles Northeast of Great Falls, & end of Rainbow Dam Road, Great Falls, Cascade County, MT

  20. 5. HOUSE No. 16 AND SURGE TANK. ROOF OF POWERHOUSE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. HOUSE No. 16 AND SURGE TANK. ROOF OF POWERHOUSE IN BACKGROUND. VIEW TO NORTHEAST. - Rainbow Hydroelectric Facility, On north bank of Missouri River 2 miles Northeast of Great Falls, & end of Rainbow Dam Road, Great Falls, Cascade County, MT

  1. 72. Credit FM. Overview of powerhouse from gallery. Notice cooling ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    72. Credit FM. Overview of powerhouse from gallery. Notice cooling duct on generator (now removed) and spare gate valve in far corner. - Battle Creek Hydroelectric System, Battle Creek & Tributaries, Red Bluff, Tehama County, CA

  2. POWERHOUSES, SOUTH ELEVATIONS SHOWING OIL HOUSE, FILER SUBSTATION, AND DRAFT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    POWERHOUSES, SOUTH ELEVATIONS SHOWING OIL HOUSE, FILER SUBSTATION, AND DRAFT TUBE OUTLET (TAILRACE), VERTICAL VIEW; FACING WEST - Shoshone Falls Hydroelectric Project, Canyon Road, North Bank of Snake River below Shoshone Falls, Tipperary Corner, Jerome County, ID

  3. POWERHOUSE MAIN FLOOR INCLUDING WORKBENCH AND ARC WELDER IN RIGHT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    POWERHOUSE MAIN FLOOR INCLUDING WORKBENCH AND ARC WELDER IN RIGHT FOREGROUND. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Glines Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA

  4. 151. Interior of north addition to powerhouse, currently used as ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    151. Interior of north addition to powerhouse, currently used as a machine shop, looking east. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power & Light Company, White River Hydroelectric Project, 600 North River Avenue, Dieringer, Pierce County, WA

  5. 40. William E. Barrett, Photographer, August 1975. ROOF OF POWERHOUSE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    40. William E. Barrett, Photographer, August 1975. ROOF OF POWERHOUSE SHOWING HOPPERS FOR SAWDUST USED TO FIRE STEAM BOILERS. DUCTS AT LEFT LEAD FROM PLANNING MILL AND OTHER MANUFACTURING OPERATIONS. - Meadow River Lumber Company, Highway 60, Rainelle, Greenbrier County, WV

  6. Interior of Right Powerhouse, generator room, looking east. The unit ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Interior of Right Powerhouse, generator room, looking east. The unit in the foreground is turbine-generator No. 11. - Columbia Basin Project, Grand Coulee Dam Powerplant Complex, Grand Coulee, Grant County, WA

  7. 154. Detail of lightning arrester on hillside above powerhouse; looking ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    154. Detail of lightning arrester on hillside above powerhouse; looking north. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power & Light Company, White River Hydroelectric Project, 600 North River Avenue, Dieringer, Pierce County, WA

  8. 156. Detail of lightning arrester on hillside above powerhouse; looking ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    156. Detail of lightning arrester on hillside above powerhouse; looking west. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power & Light Company, White River Hydroelectric Project, 600 North River Avenue, Dieringer, Pierce County, WA

  9. 155. Detail of lightning arrester on hillside above powerhouse; looking ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    155. Detail of lightning arrester on hillside above powerhouse; looking north. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power & Light Company, White River Hydroelectric Project, 600 North River Avenue, Dieringer, Pierce County, WA

  10. Interior of powerhouse looking southeast; view of operator's platform showing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Interior of powerhouse looking southeast; view of operator's platform showing type "Q" Lombard Governor, backshot needles, 20-ton traveling crane, and main oil pressure tank (lower left). - Nooksack Falls Hydroelectric Plant, Route 542, Glacier, Whatcom County, WA

  11. 64. ELECTRIC MOTOR HAYES STREET POWERHOUSE 1905: Photocopy ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    64. ELECTRIC MOTOR - HAYES STREET POWERHOUSE - 1905: Photocopy of April 1905 photograph showing an early electric motor installation used to drive the winding machinery at the Hayes Street powerhouse of the United Railroads of San Francsico. A portion of the steam engine originally used to power the machinery is visible behind the winding sheave in the left background of the photograph. - San Francisco Cable Railway, Washington & Mason Streets, San Francisco, San Francisco County, CA

  12. Interior of Right Powerhouse, looking northeast, showing shaft from Francis ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Interior of Right Powerhouse, looking northeast, showing shaft from Francis turbine (below) extending to the generator (above). This is unit G-11, a Francis turbine that is identical to the others in the Right Powerhouse: manufactured in 1950 by the Newport News Shipbuilding and Drydock Company, Newport News, Virginia; 165,000 horsepower, 330 ft. head, 120 rpm. - Columbia Basin Project, Grand Coulee Dam Powerplant Complex, Grand Coulee, Grant County, WA

  13. Interior of Right Powerhouse, looking east, showing turbinegenerator unit No. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Interior of Right Powerhouse, looking east, showing turbine-generator unit No. 11, which is undergoing repair. This is generator is identical to the other eight units located in the Right Powerhouse: Westinghouse AC generator, 108,000 kva, 13,800 volts, 4,200 amps, 3 phase, 60 cycle, 1220 exciter amps, 250 exciter volts. - Columbia Basin Project, Grand Coulee Dam Powerplant Complex, Grand Coulee, Grant County, WA

  14. 27. VIEW TO SOUTHWEST AT START OF POWERHOUSE RECONSTRUCTION: Photocopy ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    27. VIEW TO SOUTHWEST AT START OF POWERHOUSE RECONSTRUCTION: Photocopy of December 1906 photograph showing the start of reconstruction work on the powerhouse and car barn. View towards the southwest corner of the building. Note the winding sheaves under a partially completed protective shed on the left of the photograph. Also visible are the tension sheaves, and behind them the batteries of elephant boilers arrayed along the west wall of the building. - San Francisco Cable Railway, Washington & Mason Streets, San Francisco, San Francisco County, CA

  15. Defining powerhouse fruits and vegetables: a nutrient density approach.

    PubMed

    Di Noia, Jennifer

    2014-06-05

    National nutrition guidelines emphasize consumption of powerhouse fruits and vegetables (PFV), foods most strongly associated with reduced chronic disease risk; yet efforts to define PFV are lacking. This study developed and validated a classification scheme defining PFV as foods providing, on average, 10% or more daily value per 100 kcal of 17 qualifying nutrients. Of 47 foods studied, 41 satisfied the powerhouse criterion and were more nutrient-dense than were non-PFV, providing preliminary evidence of the validity of the classification scheme. The proposed classification scheme is offered as a tool for nutrition education and dietary guidance.

  16. A LINE POLE 1 IN FOREGROUND AND MYSTIC LAKE POWERHOUSE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    A LINE POLE 1 IN FOREGROUND AND MYSTIC LAKE POWERHOUSE IN BACKGROUND. A LINE POLE 1 IS A MODERN REPLACEMENT STRUCTURE WITH BROWN PORCELAIN SUSPENSION-TYPE INSULATORS. VIEW TO EAST. - Mystic Lake Hydroelectric Facility, Electric Transmission A Line, Along West Rosebud Creek, Fishtail, Stillwater County, MT

  17. Historic view of interior of powerhouse looking east; showing operator's ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Historic view of interior of powerhouse looking east; showing operator's platform containing control panel (center), and telephone booth (left) this booth was needed to reduce plant noise while using telephone. (photographer unknown, ca. 1920.) - Nooksack Falls Hydroelectric Plant, Route 542, Glacier, Whatcom County, WA

  18. 11. Credit JTL. North elevation of powerhouse showing sliding wood ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. Credit JTL. North elevation of powerhouse showing sliding wood doors used for easy installation and removal of equipment. Note painted surface indicating location of transformer annex (now removed). - Battle Creek Hydroelectric System, Battle Creek & Tributaries, Red Bluff, Tehama County, CA

  19. View of Sandbox and Spill Gate above Irving Powerhouse. The ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of Sandbox and Spill Gate above Irving Powerhouse. The Sandbox and Spill Gate are covered by the shed. Looking southeast - Childs-Irving Hydroelectric Project, Irving System, Sandbox & Spill Gate, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ

  20. View of Dry Falls Dam Powerhouse (right) and headgates to ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of Dry Falls Dam Powerhouse (right) and headgates to Main Canal (left) leading to Bacon Siphon and on to Billy Clapp Lake, looking northeast - Columbia Basin Project, Banks Lake Dry Falls Dam & Main Canal Headworks, South end of Banks Lake, Northwest of Coulee City, Grand Coulee, Grant County, WA

  1. 29. Coke oven byproduct building "XX" with ammonia stills; powerhouse ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    29. Coke oven by-product building "XX" with ammonia stills; powerhouse with 8 sisters (stacks) in background; conveyor #20 (with break) on right, pulevrized coal storage bunker on left. Looking north/northwest - Rouge Steel Company, 3001 Miller Road, Dearborn, MI

  2. Interior of powerhouse looking southwest; view of north side of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Interior of powerhouse looking southwest; view of north side of operator's platform showing main oil pressure tank (left), and hydraulic gate valves (added CA. 1930) at the base of the platform. - Nooksack Falls Hydroelectric Plant, Route 542, Glacier, Whatcom County, WA

  3. 63. VIEW OF TYPICAL TURBINE IN TURBINE WELL IN POWERHOUSE, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    63. VIEW OF TYPICAL TURBINE IN TURBINE WELL IN POWERHOUSE, LOOKING DOWN THE SHAFT FROM JUST ABOVE NORMAL WATER LEVEL. LADDER IS ON DOWNSTREAM WALL. PHOTOGRAPHER STOOD ON DECK SHOWN IN LOWER LEFT CORNER - Swan Falls Dam, Snake River, Kuna, Ada County, ID

  4. 17. POWERHOUSE FOREMAN'S BUNGALOW. DETAIL OF BUILTIN BUFFET IN DINING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. POWERHOUSE FOREMAN'S BUNGALOW. DETAIL OF BUILT-IN BUFFET IN DINING ROOM AND END OF COLONNADE. VIEW TO SOUTH-SOUTHWEST. - Thompson Falls Hydroelectric Project, Power Foreman's Bungalow, On island between Forebay Channel & ClarkFord River, Thompson Falls, Sanders County, MT

  5. 14. INTERIOR OF 1903 POWERHOUSE SHOWING TURBINEGENERATOR UNIT NO. 18, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. INTERIOR OF 1903 POWERHOUSE SHOWING TURBINE-GENERATOR UNIT NO. 18, MANUFACTURED BY GENERAL ELECTRIC IN 1949 AND RATED AT 150 MEGAWATTS. IT WAS RETIRED FROM SERVICE SEVERAL YEARS AGO. - Commonwealth Electric Company, Fisk Street Electrical Generating Station, 1111 West Cermak Avenue, Chicago, Cook County, IL

  6. 19. DETAIL OF INTERIOR OF POWERHOUSE SHOWING (LEFT TO RIGHT): ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. DETAIL OF INTERIOR OF POWERHOUSE SHOWING (LEFT TO RIGHT): SUBMERSIBLE TURBINE-GENERATOR (REMOVED FROM PENSTOCK AND PLACED HERE TEMPORARILY); GENERATOR; AND GOVERNOR - Middle Creek Hydroelectric Dam, On Middle Creek, West of U.S. Route 15, 3 miles South of Selinsgrove, Selinsgrove, Snyder County, PA

  7. Interior of powerhouse looking northwest; view of the housing for ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Interior of powerhouse looking northwest; view of the housing for the pelton wheels with operator's platform containing six backshot needle valves and type "Q" Lombard Governor (center); overhead is the 20-ton traveling crane (manufactured by northern engineering works of Detroit Michigan). - Nooksack Falls Hydroelectric Plant, Route 542, Glacier, Whatcom County, WA

  8. Historic view of interior of powerhouse looking east; showing operator's ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Historic view of interior of powerhouse looking east; showing operator's platform containing needle valves and type "Q" Lombard Governor (center), traveling crane (manufactured by the Northern Crane Co. of Detroit, Michigan), and plant operator, Walter Mann, (left) and his stepfather, Mr. Lockwood. (photographer unknow, ca.1920.) - Nooksack Falls Hydroelectric Plant, Route 542, Glacier, Whatcom County, WA

  9. Interior of powerhouse looking northeast; view of the housing for ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Interior of powerhouse looking northeast; view of the housing for one of the two pelton wheels (both of which were manufactured by the Pelton Water Wheel Company of San Francisco, California, 1910) with type "Q" Lombard Governor and backshot needle valves on operator's platform. - Nooksack Falls Hydroelectric Plant, Route 542, Glacier, Whatcom County, WA

  10. VIEW OF LOCATION OF CHILDS POWER PLANT (SHOWING POWERHOUSE AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW OF LOCATION OF CHILDS POWER PLANT (SHOWING POWERHOUSE AND TRANSFORMER FRAMEWORK AT LEFT, BELOW POWER LINES AND THE MAINTENANCE AND RESIDENTIAL COMPOUND UPSTREAM TO RIGHT) ALONG VERDE RIVER FROM FS ROAD #502. LOOKING UPSTREAM (WEST-SOUTHWEST) - Childs-Irving Hydroelectric Project, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ

  11. 76 FR 7834 - Goshen Powerhouse, LLC; Notice of Declaration of Intention and Soliciting Comments, Protests, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-11

    ... Energy Regulatory Commission Goshen Powerhouse, LLC; Notice of Declaration of Intention and Soliciting... Intention. b. Docket No: DI11-2-000. c. Date Filed: January 20, 2011. d. Applicant: Goshen Powerhouse, LLC... from the generators to a load base. When a Declaration of Intention is filed with the Federal...

  12. The Grizzly Powerhouse: A modern high-head hydrogenerating facility

    SciTech Connect

    Siebensohn, F.B.

    1995-12-31

    With the emphasis on the modernization of existing plants, there are not all that many new hydropower stations being built nowadays. A noteworthy exception from this trend is the Grizzly Powerhouse, located in the High Sierra near Quincy in northern California. This new $75 million facility is an addition to the existing 65 MW Bucks Creek hydroelectric project on the North Fork Feather River watershed in Plumas County, that is owned and operated by Pacific Gas and Electric Company. The Grizzly project is a cooperative development between Pacific Gas and Electric and the City of Santa Clara. The City paid for the powerhouse and will receive its electricity for at least 30 years. Pacific Gas and Electric has an option to buy the Grizzly project thereafter. The energy generated serves about 15,000 homes in Santa Clara and meets approximately seven percent of the City`s current peak power needs. AMERICAN HYDRO CORPORATION of York, Pennsylvania was the Prime Contractor for the supply of the power generation equipment, and as such was responsible for the performance of the system components. These included the turbine with the inlet/shut-off valve, the pressure relief valve, the governor and the generator with its excitation system.

  13. 8. Pennsylvania Railroad: 30th Street Station Powerhouse. Philadelphia, Philadelphia Co., ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. Pennsylvania Railroad: 30th Street Station Powerhouse. Philadelphia, Philadelphia Co., PA. Sec. 1101, MP 88.11. - Northeast Railroad Corridor, Amtrak route between Delaware-Pennsylvania & Pennsylvania-New Jersey state lines, Philadelphia, Philadelphia County, PA

  14. 67. Credit PG&E. Shot along length of powerhouse; exciters in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    67. Credit PG&E. Shot along length of powerhouse; exciters in the left foreground, 2000 kVA generator on right. Photo taken 10 November 1927. - Battle Creek Hydroelectric System, Battle Creek & Tributaries, Red Bluff, Tehama County, CA

  15. G.E. SLATE SWITCHBOARD WITH RELAYS IN GLINES POWERHOUSE. ALSO NOTE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    G.E. SLATE SWITCHBOARD WITH RELAYS IN GLINES POWERHOUSE. ALSO NOTE 1926 PHONE BOOTH (STILL IN OPERATION). PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Glines Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA

  16. 172. Credit PG&E. Kilarc powerhouse on right; transformers and high ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    172. Credit PG&E. Kilarc powerhouse on right; transformers and high voltage switches are in building on the left. Photo taken 10 November 1927. - Battle Creek Hydroelectric System, Battle Creek & Tributaries, Red Bluff, Tehama County, CA

  17. 26. EAST FRONT AND SOUTH SIDE OF F&CH RWY POWERHOUSE: ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    26. EAST FRONT AND SOUTH SIDE OF F&CH RWY POWERHOUSE: Photocopy of a recently discovered c. 1904 photograph showing south side and east front of powerhouse and car barn. View is looking north along Mason Street. Cars exited the building and passed onto the mainline through the large doorway just to the right of the smokestack. Note the cable car descending Washington Street past the building. - San Francisco Cable Railway, Washington & Mason Streets, San Francisco, San Francisco County, CA

  18. TBM tunnel friction values for the Grizzly Powerhouse Project

    SciTech Connect

    Stutsman, R.D.; Rothfuss, B.D.

    1995-12-31

    Tunnel boring machine (TBM) driven water conveyance tunnels are becoming increasingly more common. Despite advances in tunnel engineering and construction technology, hydraulic performance data for TBM driven tunnels remains relatively unavailable. At the Grizzly Powerhouse Project, the TBM driven water conveyance tunnel was designed using friction coefficients developed from a previous PG&E project. A range of coefficients were selected to bound the possible hydraulic performance variations of the water conveyance system. These friction coefficients, along with the water conveyance systems characteristics, and expected turbine characteristics, were used in a hydraulic transient analysis to determine the expected system pressure fluctuations, and surge chamber performance. During startup test data, these performance characteristics were measured to allow comparison to the original design assumptions. During construction of the tunnel, plaster casts were made of the actual excavated tunnel unlined and fiber reinforced shotcrete lined surfaces. These castings were used to measure absolute roughness of the surfaces so that a friction coefficient could be developed using the Moody diagram and compare them against the design values. This paper compares the assumed frictional coefficient with computed coefficients from headlosses measured during startup testing, and plaster cast measurement calculations. In addition, a comparison of coefficients will be presented for an other TBM driven water conveyance tunnel constructed in the 1980`s.

  19. Bonneville Powerhouse 2 3D CFD for the Behavioral Guidance System

    SciTech Connect

    Rakowski, Cynthia L.; Richmond, Marshall C.; Serkowski, John A.

    2010-02-01

    In 2008 and 2009, a 700 ft long, 10-ft deep floating forebay guidance wall called a behavioral guidance structure (BGS) was deployed in the Bonneville Powerhouse 2 forebay. The US Army Corps of Engineers, Portland District (CENWP) contracted with the Pacific Northwest National Laboratory (PNNL) to develop computational tools to assess the impact of the BGS on forebay hydraulics (this study). The tools developed here to provide a characterization of forebay hydraulics to be integrated with acoustic telemetry studies designed to measure the impact on juvenile salmon guidance and survival through Bonneville Powerhouse 2. In previous work, PNNL performed computational fluid dynamics (CFD) studies for the Bonneville forebay for CENWP. In this study, the existing model was modified to include the BGS. The model included a bay-by-bay spillway, a truncated Powerhouse 1 forebay, Powerhouse 2 turbine intakes and corner collector, and the forebay bathymetry extending approximately 1.5km upstream from the tip of Cascade Island. Model validation outcomes were similar to that of past studies. Additional checks were included on the impact of the differencing scheme to flow solution. It was found that using upwind differencing was adequate and it was possible to use a truncated computational mesh of this model that included a BGS upstream of Powerhouse 2 and increased spatial resolution in the vicinity of the BGS. This model has been validated, run, and provided to CENWP to use for additional analysis of the Powerhouse 2 forebay hydraulics. The PNNL particle tracking software (PT6) was used to assess the impacts of mass and relative buoyancy on particle fate. The particle tracker was run for the Half Load case for the clean forebay and for the forebay with the BGS in place and the Corner Collector on. All tracker cases showed that the BGS moved the particles across the forebay increasing the number of particles exiting the model through the Corner Collector and (for streamlines

  20. NORTH EMBANKMENT IN FOREGROUND, WITH (LR) SUBSTATION (MI98D), POWERHOUSE (MI98C), ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    NORTH EMBANKMENT IN FOREGROUND, WITH (L-R) SUBSTATION (MI-98-D), POWERHOUSE (MI-98-C), AND COOKE DAM POND IN BACKGROUND. VIEW TO SOUTH - Cooke Hydroelectric Plant, North Embankment, Cook Dam Road at Au Sable River, Oscoda, Iosco County, MI

  1. Cleanup Verification Package for the 126-F-1, 184-F Powerhouse Ash Pit

    SciTech Connect

    S. W. Clark and H. M Sulloway

    2007-10-31

    This cleanup verification package documents completion of remedial action for the 126-F-1, 184-F Powerhouse Ash Pit. This waste site received coal ash from the 100-F Area coal-fired steam plant. Leakage of process effluent from the 116-F-14 , 107-F Retention Basins flowed south into the ash pit, contaminating the northern portion.

  2. Cleanup Verification Package for the 126-F-1, 184-F Powerhouse Ash Pit

    SciTech Connect

    S. W. Clark and H. M. Sulloway

    2007-09-26

    This cleanup verification package documents completion of remedial action for the 126-F-1, 184-F Powerhouse Ash Pit. This waste site received coal ash from the 100-F Area coal-fired steam plant. Leakage of process effluent from the 116-F-14 , 107-F Retention Basins flowed south into the ash pit, contaminating the northern portion.

  3. Bonneville Powerhouse 2 Fish Guidance Efficiency Studies: CFD Model of the Forebay

    SciTech Connect

    Rakowski, Cynthia L.; Serkowski, John A.; Richmond, Marshall C.

    2012-07-01

    In ongoing work, U.S. Army Corps of Engineers, Portland District (CENWP) is seeking to better understand and improve the conditions within the Bonneville Powerhouse 2 (B2) turbine intakes to improve survival of downstream migrant salmonid smolt. In this study, the existing B2 forebay computational fluid dynamics (CFD) model was modified to include a more detailed representation of all B2 turbine intakes. The modified model was validated to existing field-measured forebay ADCP velocities. The initial CFD model scenarios tested a single project operation and the impact of adding the Behavior Guidance System (BGS) or Corner Collector. These structures had impacts on forebay flows. Most notable was that the addition of the BGS and Corner Collector reduced the lateral extent of the recirculation areas on the Washington shore and Cascade Island and reduced the flow velocity parallel to the powerhouse in front of Units 11 and 12. For these same cases, at the turbine intakes across the powerhouse, there was very little difference in the flow volume into the gatewell for the clean forebay, and the forebay with the BGS in place and/or the Corner Collector operating. The largest differences were at Units 11 to 13. The CFD model cases testing the impact of the gatewell slot fillers showed no impact to the forebay flows, but large differences within the gatewells. With the slot fillers, the flow above the standard traveling screen and into the gatewell increased (about 100 cfs at each turbine intake) and the gap flow decreased across the powerhouse for all cases. The increased flow up the gatewell was further enhanced with only half the units operating. The flow into the gatewell slot was increased about 35 cfs for each bay of each intake across the powerhouse; this change was uniform across the powerhouse. The flows in the gatewell of Unit 12, the most impacted unit for the scenarios, was evaluated. In front of the vertical barrier screen, the CFD model with slot fillers

  4. Similar view to WA1832; Historic view just west of powerhouse ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Similar view to WA-18-32; Historic view just west of powerhouse during reconstruction of penstocks and replacement of original Francis Turbine with pelton wheels, in 1912; Derrick used to lift construction materials in center, the stairway to the right leads to the transformer house, the gable-roof building to the right is a workshop (built CA 1904), whitewashed building to the left is the company hotel (built CA. 1904, and the gable-roof building in the distance is a barn (built CA. 1904). (photographer unknown, ca 1912.) - Nooksack Falls Hydroelectric Plant, Route 542, Glacier, Whatcom County, WA

  5. Monitoring and Evaluation of the Prototype Surface Collector at Bonneville First Powerhouse in 2000: Synthesis of Results

    SciTech Connect

    Carlson, Thomas J

    2001-06-01

    This report describes research done to evaluate the Prototype Surface Collector at Bonneville Dam, Powerhouse I, on the Columbia River. The surface collector is being evaluated as a means for bringing downstream migrating salmon and steelhead through the powerhouse while avoiding the turbines. The report describes evaluations conducted by PNNL, National Marine Fisheries Service, and various contractors using radio telemetry, hydroacoustics, and computational fluid dynamics models. The evaluation will provide information to the U.S. Army Corps of Engineers for their 2001 decision on whether to use surface flow bypass or extended-length submersible bar screens for long-term smolt passage at Bonneville Dam.

  6. Portable Powerhouses.

    ERIC Educational Resources Information Center

    Myslewski, Rik; Garcia, Nathan

    1998-01-01

    Reviews and compares the following nine laptop computers, focusing on their capabilities for multimedia presentations: Apple Macintosh PowerBook G3, Chem USA ChemBook 9780, Compaq Armada 7792DMT, Dell Inspiron 3000 mZ66xT, Hewlett-Packard OmniBook 3000CTX, IBM ThinkPad 770, Micro Express NP8233MMX, NEC Versa 6260, and Panasonic CF-63. Evaluation…

  7. Model study of St. Stephen powerhouse fish passage facilities, Cooper River rediversion project, South Carolina. Final report

    SciTech Connect

    Hite, J.E.; Murphy, T.E.

    1998-09-01

    This report documents a model study of the St. Stephen Power Plant, located in Berkely County, South Carolina. A previous model study revealed that the fish lift at the powerhouse could be improved by providing auxiliary attraction flows to the fish entrances. An auxiliary attraction flow (AAF) system was proposed that uses a siphon to obtain the auxiliary attraction water from the reservoir. The model investigations reported herein address the flow conditions at the discharge end of the siphon; the hydraulic aspects of the siphon are not addressed. Three different models were used to evaluate flow conditions at the discharge end of the AAF system. A 1:25-scale model of the St. Stephen powerhouse was used to improve the fish entrance conditions and to evaluate the outlet conditions for the initial AAF system. As the investigations progressed, the design of the siphon discharge system was modified to include downstream fish migration and debris passage.

  8. Bonneville Second Powerhouse Tailrace and High Flow Outfall: ADCP and drogue release field study

    SciTech Connect

    Cook, Christopher B.; Richmond, Marshall C.; Guensch, Gregory R.

    2001-03-20

    The Bonneville Project is one of four US Army Corps of Engineers operated dams along the Lower Columbia River. Each year thousands of smelt pass through this Project on their way to the Pacific Ocean. High flow outfalls, if specifically designed for fish passage, are thought to have as good or better smelt survival rates as spillways. To better understand the hydrodynamic flow field around an operating outfall, the Corps of Engineers commissioned measurement of water velocities in the tailrace of the Second Powerhouse. These data also are necessary for proper calibration and verification of three-dimensional numerical models currently under development at PNNL. Hydrodynamic characterization of the tailrace with and without the outfall operating was accomplished through use of a surface drogue and acoustic Doppler current profiler (ADCP). Both the ADCP and drogue were linked to a GPS (global positioning system); locating the data in both space and time. Measurements focused on the area nearest to the high flow outfall, however several ADCP transects and drogue releases were performed away from the outfall to document ambient flow field conditions when the outfall was not operating.

  9. Water Velocity Measurements on a Vertical Barrier Screen at the Bonneville Dam Second Powerhouse

    SciTech Connect

    Hughes, James S.; Deng, Zhiqun; Weiland, Mark A.; Martinez, Jayson J.; Yuan, Yong

    2011-11-22

    Fish screens at hydroelectric dams help to protect rearing and migrating fish by preventing them from passing through the turbines and directing them towards the bypass channels by providing a sweeping flow parallel to the screen. However, fish screens may actually be harmful to fish if they become impinged on the surface of the screen or become disoriented due to poor flow conditions near the screen. Recent modifications to the vertical barrier screens (VBS) at the Bonneville Dam second powerhouse (B2) intended to increase the guidance of juvenile salmonids into the juvenile bypass system (JBS) have resulted in high mortality and descaling rates of hatchery subyearling Chinook salmon during the 2008 juvenile salmonid passage season. To investigate the potential cause of the high mortality and descaling rates, an in situ water velocity measurement study was conducted using acoustic Doppler velocimeters (ADV) in the gatewell slot at Units 12A and 14A of B2. From the measurements collected the average approach velocity, sweep velocity, and the root mean square (RMS) value of the velocity fluctuations were calculated. The approach velocities measured across the face of the VBS varied but were mostly less than 0.3 m/s. The sweep velocities also showed large variances across the face of the VBS with most measurements being less than 1.5 m/s. This study revealed that the approach velocities exceeded criteria recommended by NOAA Fisheries and Washington State Department of Fish and Wildlife intended to improve fish passage conditions.

  10. Performance of a prototype surface collector for juvenile salmonids at Bonneville dam's first powerhouse on the Columbia River, Oregon

    USGS Publications Warehouse

    Evans, S.D.; Adams, N.S.; Rondorf, D.W.; Plumb, J.M.; Ebberts, B.D.

    2008-01-01

    During April-July 2000, we radio-tagged and released juvenile Chinook salmon (Oncorhynchus tshawytscha) and steelhead (Oncorhynchus mykiss) to evaluate a prototype surface flow bypass at Bonneville Dam on the Columbia River. The mock bypass, called a prototype surface collector (PSC), had six vertical slot entrances that were each 6 m wide and 12 m deep. The PSC was retrofitted to the upstream face of Bonneville Dam's First Powerhouse. Our objectives were to: (1) assess species-specific differences in movement patterns and behaviour of fish within 6 m of the face of the PSC, (2) estimate the efficiency and effectiveness of the PSC and (3) evaluate factors affecting the performance of the PSC. We found that 60-72% of the fish, depending on species, detected within 6 m of the PSC entered it. Of the fish that passed the First Powerhouse at turbines 1-6, 79-83% entered the PSC. Diel period was a significant contributor to PSC performance for all species, and day of year was a significant contributor to PSC performance for subyearling Chinook salmon. The PSC was twice as effective (%fish/%flow) as the spillway, passing 2.5:1 steelhead and subyearling Chinook salmon and 2.4:1 yearling Chinook salmon per unit of water. If fully implemented, the PSC would increase the percentage of fish that pass the First Powerhouse through non-turbine routes from 65-77% (without the PSC) to 76-85% (with the PSC), depending on species. Published in 2008 by John Wiley & Sons, Ltd.

  11. Passage probabilities of juvenile Chinook salmon through the powerhouse and regulating outlet at Cougar Dam, Oregon, 2011

    USGS Publications Warehouse

    Beeman, John W.; Hansen, Amy C.; Evans, Scott D.; Haner, Philip V.; Hansel, Hal C.; Smith, Collin D.

    2012-01-01

    Cougar Dam near Springfield, Oregon, is one of several federally owned and operated flood-control projects within the Willamette Valley of western Oregon that were determined by the National Oceanic and Atmospheric Administration’s National Marine Fisheries Service in 2008 to impact the long-term viability of several salmonid stocks. In response to this ruling, the U.S. Army Corps of Engineers is looking for means to reduce impacts to salmonids, including improving downstream passage of juvenile salmonids at Cougar Dam. This study of juvenile Chinook salmon (Oncorhynchus tshawytscha) passage at Cougar Dam was conducted to inform decisions about potential improvements for downstream fish passage. The primary objective of the study was to estimate route-specific passage probabilities of yearling Chinook salmon at Cougar Dam. The study was conducted using fish from a nearby hatchery surgically implanted with radio transmitters and passive integrated transponder (PIT) tags and released near the entrance of a temperature control tower through which all water going through the dam must pass. Water passing through the temperature control tower may be routed through a penstock to a powerhouse with two Francis turbines, or to a spillway-like structure called the regulating outlet. Secondary objectives of the study were to estimate the probability that fish enter a bypass at a non-federal facility downstream, and to estimate dam-passage and in-river fish survival. Dam operating conditions during the study included an average forebay elevation of 1,580 feet (National Geodetic Vertical Datum of 1929) and an average of 48.2 percent of the total dam discharge of 1,106 cubic feet per second passing through a regulating outlet opening of 1.25 feet. Dam passage probability was greatest at night (0.8741 standard error [SE] 0.0265) and primarily through the regulating outlet (0.8896 SE 0.0617 day; 0.9417 SE 0.0175 night). The joint probability of entering the bypass at Leaburg Dam

  12. Emergency assessment of post-fire debris-flow hazards for the 2013 Powerhouse fire, southern California

    USGS Publications Warehouse

    Staley, Dennis M.; Smoczyk, Gregory M.; Reeves, Ryan R.

    2013-01-01

    Wildfire dramatically alters the hydrologic response of a watershed such that even modest rainstorms can produce dangerous flash floods and debris flows. Existing empirical models were used to predict the probability and magnitude of debris-flow occurrence in response to a 10-year recurrence interval rainstorm for the 2013 Powerhouse fire near Lancaster, California. Overall, the models predict a relatively low probability for debris-flow occurrence in response to the design storm. However, volumetric predictions suggest that debris flows that occur may entrain a significant volume of material, with 44 of the 73 basins identified as having potential debris-flow volumes between 10,000 and 100,000 cubic meters. These results suggest that even though the likelihood of debris flow is relatively low, the consequences of post-fire debris-flow initiation within the burn area may be significant for downstream populations, infrastructure, and wildlife and water resources. Given these findings, we recommend that residents, emergency managers, and public works departments pay close attention to weather forecasts and National-Weather-Service-issued Debris Flow and Flash Flood Outlooks, Watches, and Warnings and that residents adhere to any evacuation orders.

  13. Evaluation of Fish Losses through Screen Gaps at Modified and Unmodified Intakes of Bonneville Dam Second Powerhouse in 2003

    SciTech Connect

    Ploskey, Gene R.; Weiland, Mark A.; Schilt, Carl R.

    2004-06-14

    This report was prepared by the Pacific Northwest National Lab., Richland, Washington, BAE Systems, Inc., a subcontractor to the U.S. Army Engineer Research and Development Center (ERDC), Vicksburg, Mississippi. This study examined the effect of gatewell modifications on the proportion of fish lost through the gap between the top of submerged traveling screens (STSs) and the ceilings of intakes in one un-modified and two modified turbine units at Bonneville Dam Second Powerhouse (B2). Combined modifications reduced the proportion of flow through the gap from 44% to 16% and increased the proportion moving up the gatewell from 56% to 84%. We used a Dual-Frequency Identification Sonar (DIDSON) acoustic camera to record proportions of juvenile salmonids moving up into the gatewell and through the gap. The acoustic camera was used to record images of fish passing up into the gatewell and through the gap for 8-h on three successive nights in every intake of units 13, 15, and 17 (i.e., 9 intakes x 3 nights = 27 nights each season). Only 28.6% of the objects detected in spring and 12.9% in summer were determined to be fish. Other objects included sticks and debris. Although the true magnitude of STS gap-loss is unknown, both acoustic camera and netting estimates indicate that gatewell modifications reduce relative gap loss by about 67%.

  14. Characterization of Gatewell Orifice Lighting at the Bonneville Dam Second Powerhouse and Compendium of Research on Light Guidance with Juvenile Salmonids

    SciTech Connect

    Mueller, Robert P.; Simmons, Mary Ann

    2007-12-29

    The goal of the study described in this report is to provide U.S. Army Corps of Engineers (USACE) biologists and engineers with general design guidelines for using artificial lighting to enhance the passage of juvenile salmonids into the collection channel at the Bonneville Dam second powerhouse (B2). During fall 2007, Pacific Northwest National Laboratory (PNNL) researchers measured light levels in the field at one powerhouse orifice through which fish must pass to reach the collection channel. Two light types were evaluated—light-emitting diode (LED) lights and halogen spot lights. Additional measurements with mercury lamps were made at the PNNL Aquatic Research Laboratory to determine baseline intensity of the current lighting. A separate chapter synthesizes the relevant literature related to light and fish guidance for both field and laboratory studies. PNNL will also review the Corps plans for existing lighting protocol at all of the Portland District projects and help develop a uniform lighting scheme which could be implemented. The specific objectives for this study are to 1. Create a synthesis report of existing lighting data for juvenile salmonid attraction and deterrence and how the data are used at fish bypass facilities. 2. Evaluate current B2 orifice lighting conditions with both LED and halogen sources. 3. Make recommendations as to what lighting intensity, source, and configuration would improve passage at the B2 orifices. 4. Review USACE plans for retrofit of existing systems (to be assessed at a later date).

  15. Protecting the mitochondrial powerhouse.

    PubMed

    Scheibye-Knudsen, Morten; Fang, Evandro F; Croteau, Deborah L; Wilson, David M; Bohr, Vilhelm A

    2015-03-01

    Mitochondria are the oxygen-consuming power plants of cells. They provide a critical milieu for the synthesis of many essential molecules and allow for highly efficient energy production through oxidative phosphorylation. The use of oxygen is, however, a double-edged sword that on the one hand supplies ATP for cellular survival, and on the other leads to the formation of damaging reactive oxygen species (ROS). Different quality control pathways maintain mitochondria function including mitochondrial DNA (mtDNA) replication and repair, fusion-fission dynamics, free radical scavenging, and mitophagy. Further, failure of these pathways may lead to human disease. We review these pathways and propose a strategy towards a treatment for these often untreatable disorders.

  16. Evaluation of Steelhead Kelt Passage into the Bonneville Dam Second Powerhouse Corner Collector Prior to the Juvenile Migration Seasons, 2007 and 2008

    SciTech Connect

    Weiland, Mark A.; Kim, Jina; Nagy, William T.; Johnson, Gary E.

    2009-09-01

    This report documents the results of a steelhead kelt passage study conducted by the PNNL for the U.S. Army Corps of Engineers at Bonneville Dam in early spring 2007 and 2008. At the Second Powerhouse, a surface flow outlet called the corner collector (B2CC) may be an effective non-turbine passage route for steelhead kelt moving downstream in early spring before the main juvenile emigration season. The goal of this project was to inform management decisions regarding B2CC operations by estimating the number of kelt using the B2CC for downstream passage at Bonneville Dam prior to the juvenile spring migration season. We performed a hydroacoustic study from March 2 to April 10, 2007 and from March 13 to April 15, 2008.

  17. Evaluation of a prototype surface flow bypass for juvenile salmon and steelhead at the powerhouse of Lower Granite Dam, Snake River, Washington, 1996-2000

    USGS Publications Warehouse

    Johnson, G.E.; Anglea, S.M.; Adams, N.S.; Wik, T.O.

    2005-01-01

    A surface flow bypass takes advantage of the natural surface orientation of most juvenile salmon Oncorhynchus spp. and steelhead O. mykiss by providing a route in the upper water column that downstream migrant fishes can use to pass a hydroelectric dam safely. A prototype structure, called the surface bypass and collector (SBC), was retrofitted on the powerhouse of Lower Granite Dam and was evaluated annually with biotelemetry and hydroacoustic techniques during the 5-year life span of the structure (1996-2000) to determine the entrance configuration that maximized passage efficiency and minimized forebay residence time. The best tested entrance configuration had maximum inflow (99 m 3/s) concentrated in a single surface entrance (5 m wide, 8.5 m deep). We identified five important considerations for future surface flow bypass development in the lower Snake River and elsewhere: (1) an extensive flow net should be formed in the forebay by use of relatively high surface flow bypass discharge (>7% of total project discharge); (2) a gradual increase in water velocity with increasing proximity to the surface flow bypass (ideally, acceleration 3 m/s) to entrain the subject juvenile fishes; (4) the shape and orientation of the surface entrance(s) should be adapted to fit site-specific features; and (5) construction of a forebay wall to increase fish availability to the surface flow bypass should be considered. The efficiency of the SBC was not high enough (maximum of 62% relative to passage at turbine units 4-5) for the SBC to operate as a stand-alone bypass. Anywhere that surface-oriented anadromous fish must negotiate hydroelectric dams, surface flow bypass systems can provide cost-effective use of typically limited water supplies to increase the nonturbine passage, and presumably survival, of downstream migrants. ??Copyright by the American Fisheries Society 2005.

  18. Outfall Site and Type Selection for a New Surface Flow Outlet to Pass Juvenile Fish at Bonneville Dam’s Second Powerhouse, Columbia River

    SciTech Connect

    Johnson, Gary E.; Ebberts, Blaine; Giorgi, Albert E.; Kuhn, Karen; Lee, Randy; Plump, John H.; Stensby, David A.; Sweeney, Charles E.

    2008-08-01

    A site near the downstream tip of Cascades Island and a mid-level cantilever outfall type were selected for the high flow outfall of the new surface flow juvenile fish bypass at Bonneville Dam’s Second Powerhouse. The new bypass will be a modification of the existing ice and trash sluice chute, which discharges into the tailrace with jet impact on the bottom near a shoreline that predators inhabit. Thus, a new site and type are necessary for this high flow (> 28.3 m3/s) outfall. Technical guidelines on high flow outfall location and design were established and applied during the outfall development process. Critical design parameters included discharge at 150 m3/s, entry velocities approaching 15.2 m/s, and tailwater elevation range of 6.1 m. For outfall siting, the selection process began with identification of nine initial alternatives. Screening, evaluation, and selection stages narrowed the list to two sites – “Range D” 121.9 m straight downstream from the existing outfall and “Range F” 760 m downstream near the tip of Cascades Island. For outfall type, the selection process was initiated with conceptualization of 13 alternatives. During successive screening, evaluation, consolidation, and selection stages, professional judgment and quantitative comparisons were used to select two finalists – “Adjustable Cantilever” and “Mid-Level Cantilever.” The four combinations of outfall site/type were evaluated in 1:30 and 1:100 scale physical hydraulic models. The process resulted in selection of a mid-level cantilever with plunge pool at the tip of Cascades Island. The system is scheduled for completion in March 2004.

  19. InSight Mission Education and Communication: Powerhouse partners leverage global networks to put authentic planetary science into the hands and minds of students of all ages

    NASA Astrophysics Data System (ADS)

    Banerdt, W. B.; Jones, J. H.

    2015-12-01

    InSight Mission Education and Communication: Powerhouse Partners Leverage Global Networks To Put Authentic Planetary Science into the Hands and Minds of Students. NASA's InSight (Interior Exploration using Seismic Investigations, Geodesy and Heat Transport) is a NASA Discovery Program mission that will place a single geophysical lander on Mars to study its deep interior. InSight will launch in March 2016 aboard an Atlas V 401 rocket from Space Launch Complex 3E at Vandenberg Air Force Base in California, and land on Mars in September 2016, beginning science return in October 2016.By using sophisticated geophysical instruments, InSight will delve deep beneath the surface of Mars, detecting the fingerprints of the processes of terrestrial planet formation, as well as measuring the planet's "vital signs": Its "pulse" (seismology), "temperature" (heat flow probe), and "reflexes" (precision tracking). InSight's E/PO Partners all of which already work with NSF, Department of Education and NASA will put authentic Mars data and analysis tools in the hands of educators, students and the public. IRIS - Incorporated Research Institutions for Seismology provides lessons, seismograph software, animations, videos, and will use InSight data to focus on how students can compare seismic data from Mars and Earth. SCEC - Southern California Earthquake Center's "Vital Signs of the Planet" professional development program for science teachers is creating, and test teaching standards-aligned STEM materials to help additional teachers work with comparative planetary concepts. They are also installinglow cost strong motion research accelerometers in all participating schools. ASP - Astronomical Society of the Pacific will deliver Planet Core Outreach toolkits with an InSight focus to 380 amateur astronomy clubs engaged in Informal Education. Space Math - delivered twenty standards based mathematics lessons using InSight and Mars physical and science data which enable students to acquire

  20. Outfall Site and Type Selection for a New Surface Flow Outlet to Pass Juvenile Salmonids at Bonneville Dam’s Second Powerhouse, Columbia River

    SciTech Connect

    Johnson, Gary E.; Ebberts, Blaine D.; Giorgi, Albert E.; Kuhn, Karen; Lee, Randall T.; Plump, John H.; Stensby, David A.; Sweeney, Charles E.

    2008-01-01

    A site near the downstream tip of Cascades Island with a mid-level chute outfall type was selected for the high flow (> 28.3 m3/s) outfall of the new surface flow outlet for juvenile salmonids at Bonneville Dam’s Second Powerhouse (B2). The new passage route and outfall are a result of modifications to the original ice and trash sluice chute to increase discharge capacity and improve passage conditions, including a new outfall type and site. Technical guidelines on high flow outfall location and design were established concurrently with the outfall development process. Critical design parameters for the new B2 outfall included discharge of 150 m3/s, jet entry velocities approaching 15.2 m/s, and a tailwater elevation range of 6.1 m. For outfall siting, the selection process began with identification of nine initial alternatives. Screening, evaluation, and selection stages narrowed the list to two outfall sites – “Range D” 122 m directly downstream from the existing sluice chute outfall and “Range F” 760 m downstream near the end of Cascades Island. For outfall type, the selection process was initiated with conceptualization of 13 alternatives. Following successive screening, evaluation, consolidation, and selection stages, two outfall types became finalists – “Adjustable Cantilever” and “Mid-Level Cantilever.” The four combinations of outfall site/type were evaluated in 1:30 and 1:100 scale physical hydraulic models and a Mid-Level Cantilever at the tip of Cascades Island in Range F was selected. During further engineering after our study, the cantilever was replaced with a monolith structure to reduce construction costs, resulting in a mid-level chute outfall that was installed in 2004. Post-construction evaluations indicated survival rates around 100% through the B2CC were the highest of all passage routes at Bonneville Dam. The B2CC surface flow outlet with its high flow outfall provided a major improvement to juvenile salmonid passage at

  1. Issues affecting the industrial powerhouse and powerhouse operation

    SciTech Connect

    Dessette, R.D.

    1995-09-01

    The growth of industrial boilre regulatory issues is discussed. These issues include environmental issues, e.g., monitoring, air toxics, NO{sub x} and SO{sub 2} emissions, ozone transport, waste management, Title V permits, new source reviews etc., energy issues, e.g., competitive sourcing, global climate change, energy efficiency and renewables, and government affairs issues, e.g., cost effectiveness risk assessment, and amendment of the 1990 Clean Air Acts.

  2. Manganese Superoxide Dismutase: Guardian of the Powerhouse

    PubMed Central

    Holley, Aaron K.; Bakthavatchalu, Vasudevan; Velez-Roman, Joyce M.; St. Clair, Daret K.

    2011-01-01

    The mitochondrion is vital for many metabolic pathways in the cell, contributing all or important constituent enzymes for diverse functions such as β-oxidation of fatty acids, the urea cycle, the citric acid cycle, and ATP synthesis. The mitochondrion is also a major site of reactive oxygen species (ROS) production in the cell. Aberrant production of mitochondrial ROS can have dramatic effects on cellular function, in part, due to oxidative modification of key metabolic proteins localized in the mitochondrion. The cell is equipped with myriad antioxidant enzyme systems to combat deleterious ROS production in mitochondria, with the mitochondrial antioxidant enzyme manganese superoxide dismutase (MnSOD) acting as the chief ROS scavenging enzyme in the cell. Factors that affect the expression and/or the activity of MnSOD, resulting in diminished antioxidant capacity of the cell, can have extraordinary consequences on the overall health of the cell by altering mitochondrial metabolic function, leading to the development and progression of numerous diseases. A better understanding of the mechanisms by which MnSOD protects cells from the harmful effects of overproduction of ROS, in particular, the effects of ROS on mitochondrial metabolic enzymes, may contribute to the development of novel treatments for various diseases in which ROS are an important component. PMID:22072939

  3. Quasars - powerhouses at the edge of time

    NASA Astrophysics Data System (ADS)

    Gavin, M.

    2000-06-01

    1999 was the 70th anniversary of Edwin Hubble's seminal publication1 showing a cosmological redshift in galaxies. More recent discoveries of quasars have extended the universe's boundaries back in time nearer to the Big Bang. Some amateur spectrograms of quasars are presented showing a cosmological redshift.

  4. Ectopic Lymphoid Structures: Powerhouse of Autoimmunity

    PubMed Central

    Corsiero, Elisa; Nerviani, Alessandra; Bombardieri, Michele; Pitzalis, Costantino

    2016-01-01

    Ectopic lymphoid structures (ELS) often develop at sites of inflammation in target tissues of autoimmune diseases, such as rheumatoid arthritis, Sjögren’s syndrome, multiple sclerosis, myasthenia gravis, and systemic lupus erythematosus. ELS are characterized by the formation of organized T/B cells aggregates, which can acquire follicular dendritic cells network supporting an ectopic germinal center response. In this review, we shall summarize the mechanisms that regulate the formation of ELS in tertiary lymphoid organs, with particular emphasis on the role of lymphoid chemokines in both formation and maintenance of ELS, the role of emerging positive and negative regulators of ELS development and function, including T follicular helper cells and IL-27, respectively. Finally, we shall discuss the main functions of ELS in supporting the affinity maturation, clonal selection, and differentiation of autoreactive B cells contributing to the maintenance and perpetuation of humoral autoimmunity. PMID:27799933

  5. Invisalign and porecelain: the contemporary restorative powerhouse.

    PubMed

    Smallwood, Trent W

    2009-12-01

    For years, restorative practices and traditional orthodontics stood largely separate from one another save for the most extreme instances. Orthodontics has evolved over the years, and a new breed of orthodontic technology appeared in the late 1990s. A clear alternative to traditional orthodontics emerged, and Invisalign (Align Technology, Inc., Santa Clara, CA) was born. Historically, orthodontics and restorative work, within a practice, rarely coincided on the same patient, but the advances within both disciplines have afforded a new and innovative way of considering conservative dentistry. No longer does there have to be aggressive preparation to attain a desired result. With patient understanding, a negligible amount of patience, and the desire to achieve the very best dentistry has to offer, the potential is limitless.

  6. From developing region to energy powerhouse

    SciTech Connect

    Gray, F.

    1997-12-31

    Western prospectors are poised to go east, lured by the lucrative ore of electricity infrastructure. But increasingly, Asia is sending the message: Not For Sale. China, for example, has placed limits on the profits Western companies can squeeze out of their investments. As a result, they have adopted a strategy of {open_quotes}build, operate, and transfer,{close_quotes} says Frank Gray, editor of Power in Asia, a Financial Times energy publication based in London, England. {open_quotes}A key provision of the arrangement is that the company investing in the project owns that project for only a predetermined time, usually 15 to 20 years. After the term expires, project ownership reverts to the host nation,{close_quotes} Gray says. But the developing countries of Asia need an infusion of foreign capital, and Western utilities need to expand into that market to compensate for a relatively flat growth rate at home. {open_quotes}Central planning, in fact, is part of the legacy of colonial rule. Now, however, it will be national politicians, not foreign diplomats, who will call the shots,{close_quotes} Gray says.

  7. Artery Tertiary Lymphoid Organs: Powerhouses of Atherosclerosis Immunity

    PubMed Central

    Yin, Changjun; Mohanta, Sarajo Kumar; Srikakulapu, Prasad; Weber, Christian; Habenicht, Andreas J. R.

    2016-01-01

    Artery tertiary lymphoid organs (ATLOs) are atherosclerosis-associated lymphoid aggregates with varying degrees of complexity ranging from small T/B-cell clusters to well-structured lymph node-like though unencapsulated lymphoid tissues. ATLOs arise in the connective tissue that surrounds diseased arteries, i.e., the adventitia. ATLOs have been identified in aged atherosclerosis-prone hyperlipidemic apolipoprotein E-deficient (ApoE−/−) mice: they are organized into distinct immune cell compartments, including separate T-cell areas, activated B-cell follicles, and plasma cell niches. Analyses of ATLO immune cell subsets indicate antigen-specific T- and B-cell immune reactions within the atherosclerotic arterial wall adventitia. Moreover, ATLOs harbor innate immune cells, including a large component of inflammatory macrophages, B-1 cells, and an aberrant set of antigen-presenting cells. There is marked neoangiogenesis, irregular lymphangiogenesis, neoformation of high endothelial venules, and de novo synthesis of lymph node-like conduits. Molecular mechanisms of ATLO formation remain to be identified though media vascular smooth muscle cells may adopt features of lymphoid tissue organizer-like cells by expressing lymphorganogenic chemokines, i.e., CXCL13 and CCL21. Although these data are consistent with the view that ATLOs participate in primary T- and B-cell responses against elusive atherosclerosis-specific autoantigens, their specific protective or disease-promoting roles remain to be identified. In this review, we discuss what is currently known about ATLOs and their potential impact on atherosclerosis and make attempts to define challenges ahead. PMID:27777573

  8. Trends & Indicators: NE Universities Still R&D Powerhouses

    ERIC Educational Resources Information Center

    Harney, John O.

    2011-01-01

    New England universities performed more than $4 billion worth of research and development (R&D) in 2009, but the region's share of total R&D performed by all U.S. universities remained at 7.3%, down from more than 10% in the 1980s. The region's university research labs have been world-famous for ideas that breed companies and whole industries in…

  9. Mitochondrial Chemical Biology: New Probes Elucidate the Secrets of the Powerhouse of the Cell.

    PubMed

    Wisnovsky, Simon; Lei, Eric K; Jean, Sae Rin; Kelley, Shana O

    2016-08-18

    Mitochondria are energy-producing organelles with essential functions in cell biology, and mitochondrial dysfunction is linked to a wide range of human diseases. Efforts to better understand mitochondrial biology have been limited by the lack of tools for manipulating and detecting processes occurring within the organelle. Here, we highlight recent significant advances in mitochondrial chemical biology that have produced new tools and techniques for studying mitochondria. Specifically, we focus on the development of chemical tools to perturb mitochondrial biochemistry, probes allowing precise measurement of mitochondrial function, and new techniques for high-throughput characterization of the mitochondrial proteome. Taken together, these advances in chemical biology will enable exciting new directions in mitochondrial research.

  10. Chandra Discovers X-Ray Ring Around Cosmic Powerhouse in Crab Nebula

    NASA Astrophysics Data System (ADS)

    1999-09-01

    After barely two months in space, NASA's Chandra X-ray Observatory has taken a stunning image of the Crab Nebula, the spectacular remains of a stellar explosion, and has revealed something never seen before: a brilliant ring around the nebula's heart. Combined with observations from the Hubble Space Telescope, the image provides important clues to the puzzle of how the cosmic "generator," a pulsing neutron star, energizes the nebula, which still glows brightly almost 1,000 years after the explosion. "The inner ring is unique," said Professor Jeff Hester of Arizona State University, Tempe, AZ. "It has never been seen before, and it should tell us a lot about how the energy from the pulsar gets into the nebula. It's like finding the transmission lines between the power plant and the light bulb." Professor Mal Ruderman of Columbia University, New York, NY, agreed. "The X-rays Chandra sees are the best tracer of where the energy is. With images such as these, we can directly diagnose what is going on." What is going on, according to Dr. Martin Weisskopf, Chandra Project Scientist from NASA's Marshall Space Flight Center, Huntsville, AL, is awesome. "The Crab pulsar is accelerating particles up to the speed of light and flinging them out into interstellar space at an incredible rate." The image shows tilted rings or waves of high-energy particles that appear to have been flung outward over the distance of a light year from the central star, and high-energy jets of particles blasting away from the neutron star in a direction perpendicular to the spiral. Hubble Space Telescope images have shown moving knots and wisps around the neutron star, and previous X-ray images have shown the outer parts of the jet and hinted at the ring structure. With Chandra's exceptional resolution, the jet can be traced all the way in to the neutron star, and the ring pattern clearly appears. The image was made with Chandra's Advanced CCD Imaging Spectrometer and High Energy Transmission Grating. The Crab Nebula, easily the most intensively studied object beyond our solar system, is the remnant of a star that was observed to explode in 1054 A.D. Chinese astronomers in that year reported a "guest star" that appeared suddenly and remained visible for weeks, even during daytime. From gamma-ray telescopes to radio telescopes, the Crab has been observed using virtually every astronomical instrument that could see that part of the sky. Unraveling the mysteries of the Crab has proven to be the door to insight after insight into the workings of the universe. The Crab convincingly tied the origin of enigmatic "pulsars" to the stellar cataclysms known as supernovas. Observations of the expanding cloud of filaments in the Crab were instrumental in confirming the cosmic origin of the chemical elements from which planets (and people) are made. The nebula is located 6,000 light years from Earth in the constellation Taurus. The Crab pulsar, which was discovered by radio astronomers in 1968, is a neutron star rotating 30 times per second. Neutron stars are formed in the seconds before a supernova explosion when gravity crushes the central core of the star to densities 50 trillion times that of lead and a diameter of only 12 miles. Another consequence of the dramatic collapse is that neutron stars are rapidly rotating and highly magnetized. Like a gigantic cosmic generator, the rotating magnet generates 10 quadrillion volts of electricity, 30 million times that of a typical lightning bolt. "It is an incredibly efficient generator," Ruderman explained. "More than ninety-five percent efficient. There's nothing like it on Earth." Press: Fact Sheet To follow Chandra's progress, visit the Chandra News Web site at: http://chandra.harvard.edu AND http://chandra.nasa.gov NASA's Marshall Space Flight Center manages the Chandra program. TRW, Inc., Redondo Beach, CA, is the prime contractor for the spacecraft. The Smithsonian's Chandra X-ray Center controls science and flight operations from Cambridge, MA. High resolution digital versions of the X-ray image (300 dpi JPG, TIFF) and other information associated with this release are available on the Internet at: http://chandra.harvard.edu/photo/0052/index.html or via links in: http://chandra.harvard.edu An animation of a supernova explosion and the formation of a supernova remnant can be found at: http://chandra.harvard.edu/resources/animations/pulsar.html

  11. Cultivating Political Powerhouses: TFA Corps Members Experiences That Shape Local Political Engagement

    ERIC Educational Resources Information Center

    Jacobsen, Rebecca; White, Rachel; Reckhow, Sarah

    2016-01-01

    In recent years, Teach for America (TFA) has invested in developing corps members as leaders. Although TFA asks corps members for a two-year commitment, TFA celebrates the achievements of alumni who have gone on to careers in politics, public policy, and advocacy. Thus, many community leaders see the arrival of TFA corps members as having a…

  12. Power2: The power of yeast genetics applied to the powerhouse of the cell

    PubMed Central

    Rutter, Jared; Hughes, Adam L.

    2014-01-01

    The budding yeast Saccharomyces cerevisiae has served as a remarkable model organism for numerous seminal discoveries in biology. This paradigm extends to the mitochondria, a central hub for cellular metabolism, where studies in yeast have helped reinvigorate the field and launch an exciting new era in mitochondrial biology. Here, we discuss few recent examples in which yeast research has laid a foundation for our understanding of evolutionarily conserved mitochondrial processes and functions; from the key factors and pathways involved in the assembly of the OXPHOS complexes, to metabolite transport, lipid metabolism, and interorganelle communication. We also highlight new areas of yeast mitochondrial biology that will likely aid in our understanding of mitochondrial etiology of disease in the years to come. PMID:25591985

  13. Under-Stated Powerhouses: Scottish Independent Schools, Their Characteristics and Their Capitals

    ERIC Educational Resources Information Center

    Forbes, Joan; Weiner, Gaby

    2008-01-01

    This paper presents a study from the Scottish Independent School Project (SISP). The first part of the paper provides an overview of the characteristics of Scottish independent schools (e.g. location, structure, fees) with the aim of distinguishing the different orientations of schools in the sector. The second and main part of the paper is a…

  14. American Recovery and Reinvestment Act: North Fork Skokomish Powerhouse at Cushman No. 2 Dam

    SciTech Connect

    Fischer, Steve; McCarty, Patrick

    2013-09-30

    The objective of this project was to add generating capacity on an in-stream flow release at Tacoma Power's Cushman hydroelectric project, Cushman No. 2 Dam, FERC Project P-460. The flow that is being used to generate additional electricity was being discharged from a valve at the base of the dam without recovery of the energy. A second objective to the project was to incorporate upstream fish passage by use of a fish collection structure attached to the draft tubes of the hydroelectric units. This will enable reintroduction of native anadromous fish above the dams which have blocked fish passage since the late 1920's. The project was funded in part by the American Recovery and Reinvestment Act through the Department of Energy, Office of Energy, Efficiency and Renewable Energy, Wind and Water Power Program.

  15. Energy transfer in "parasitic" cancer metabolism: mitochondria are the powerhouse and Achilles' heel of tumor cells.

    PubMed

    Martinez-Outschoorn, Ubaldo E; Pestell, Richard G; Howell, Anthony; Tykocinski, Mark L; Nagajyothi, Fnu; Machado, Fabiana S; Tanowitz, Herbert B; Sotgia, Federica; Lisanti, Michael P

    2011-12-15

    It is now widely recognized that the tumor microenvironment promotes cancer cell growth and metastasis via changes in cytokine secretion and extracellular matrix remodeling. However, the role of tumor stromal cells in providing energy for epithelial cancer cell growth is a newly emerging paradigm. For example, we and others have recently proposed that tumor growth and metastasis is related to an energy imbalance. Host cells produce energy-rich nutrients via catabolism (through autophagy, mitophagy, and aerobic glycolysis), which are then transferred to cancer cells to fuel anabolic tumor growth. Stromal cell-derived L-lactate is taken up by cancer cells and is used for mitochondrial oxidative phosphorylation (OXPHOS) to produce ATP efficiently. However, "parasitic" energy transfer may be a more generalized mechanism in cancer biology than previously appreciated. Two recent papers in Science and Nature Medicine now show that lipolysis in host tissues also fuels tumor growth. These studies demonstrate that free fatty acids produced by host cell lipolysis are re-used via beta-oxidation (beta-OX) in cancer cell mitochondria. Thus, stromal catabolites (such as lactate, ketones, glutamine and free fatty acids) promote tumor growth by acting as high-energy onco-metabolites. As such, host catabolism, via autophagy, mitophagy and lipolysis, may explain the pathogenesis of cancer-associated cachexia and provides exciting new druggable targets for novel therapeutic interventions. Taken together, these findings also suggest that tumor cells promote their own growth and survival by behaving as a "parasitic organism." Hence, we propose the term "Parasitic Cancer Metabolism" to describe this type of metabolic coupling in tumors. Targeting tumor cell mitochondria (OXPHOS and beta-OX) would effectively uncouple tumor cells from their hosts, leading to their acute starvation. In this context, we discuss new evidence that high-energy onco-metabolites (produced by the stroma) can confer drug resistance. Importantly, this metabolic chemo-resistance is reversed by blocking OXPHOS in cancer cell mitochondria with drugs like Metformin, a mitochondrial "poison." In summary, parasitic cancer metabolism is achieved architecturally by dividing tumor tissue into at least two well-defined opposing "metabolic compartments:" catabolic and anabolic.

  16. Mitochondrial Chemical Biology: New Probes Elucidate the Secrets of the Powerhouse of the Cell.

    PubMed

    Wisnovsky, Simon; Lei, Eric K; Jean, Sae Rin; Kelley, Shana O

    2016-08-18

    Mitochondria are energy-producing organelles with essential functions in cell biology, and mitochondrial dysfunction is linked to a wide range of human diseases. Efforts to better understand mitochondrial biology have been limited by the lack of tools for manipulating and detecting processes occurring within the organelle. Here, we highlight recent significant advances in mitochondrial chemical biology that have produced new tools and techniques for studying mitochondria. Specifically, we focus on the development of chemical tools to perturb mitochondrial biochemistry, probes allowing precise measurement of mitochondrial function, and new techniques for high-throughput characterization of the mitochondrial proteome. Taken together, these advances in chemical biology will enable exciting new directions in mitochondrial research. PMID:27478157

  17. Long non-coding RNAs: An emerging powerhouse in the battle between life and death of tumor cells.

    PubMed

    Xiong, Xing-Dong; Ren, Xingcong; Cai, Meng-Yun; Yang, Jay W; Liu, Xinguang; Yang, Jin-Ming

    2016-05-01

    Long non-coding RNAs (lncRNAs) represent a class of non-protein coding transcripts longer than 200 nucleotides that have aptitude for regulating gene expression at the transcriptional, post-transcriptional or epigenetic levels. In recent years, lncRNAs, which are believed to be the largest transcript class in the transcriptomes, have emerged as important players in a variety of biological processes. Notably, the identification and characterization of numerous lncRNAs in the past decade has revealed a role for these molecules in the regulation of cancer cell survival and death. It is likely that this class of non-coding RNA constitutes a critical contributor to the assorted known or/and unknown mechanisms of intrinsic or acquired drug resistance. Moreover, the expression of lncRNAs is altered in various patho-physiological conditions, including cancer. Therefore, lncRNAs represent potentially important targets in predicting or altering the sensitivity or resistance of cancer cells to various therapies. Here, we provide an overview on the molecular functions of lncRNAs, and discuss their impact and importance in cancer development, progression, and therapeutic outcome. We also provide a perspective on how lncRNAs may alter the efficacy of cancer therapy and the promise of lncRNAs as novel therapeutic targets for overcoming chemoresistance. A better understanding of the functional roles of lncRNA in cancer can ultimately translate to the development of novel, lncRNA-based intervention strategies for the treatment or prevention of drug-resistant cancer.

  18. Capturing the biofuel wellhead and powerhouse: the chloroplast and mitochondrial genomes of the leguminous feedstock tree Pongamia pinnata.

    PubMed

    Kazakoff, Stephen H; Imelfort, Michael; Edwards, David; Koehorst, Jasper; Biswas, Bandana; Batley, Jacqueline; Scott, Paul T; Gresshoff, Peter M

    2012-01-01

    Pongamia pinnata (syn. Millettia pinnata) is a novel, fast-growing arboreal legume that bears prolific quantities of oil-rich seeds suitable for the production of biodiesel and aviation biofuel. Here, we have used Illumina® 'Second Generation DNA Sequencing (2GS)' and a new short-read de novo assembler, SaSSY, to assemble and annotate the Pongamia chloroplast (152,968 bp; cpDNA) and mitochondrial (425,718 bp; mtDNA) genomes. We also show that SaSSY can be used to accurately assemble 2GS data, by re-assembling the Lotus japonicus cpDNA and in the process assemble its mtDNA (380,861 bp). The Pongamia cpDNA contains 77 unique protein-coding genes and is almost 60% gene-dense. It contains a 50 kb inversion common to other legumes, as well as a novel 6.5 kb inversion that is responsible for the non-disruptive, re-orientation of five protein-coding genes. Additionally, two copies of an inverted repeat firmly place the species outside the subclade of the Fabaceae lacking the inverted repeat. The Pongamia and L. japonicus mtDNA contain just 33 and 31 unique protein-coding genes, respectively, and like other angiosperm mtDNA, have expanded intergenic and multiple repeat regions. Through comparative analysis with Vigna radiata we measured the average synonymous and non-synonymous divergence of all three legume mitochondrial (1.59% and 2.40%, respectively) and chloroplast (8.37% and 8.99%, respectively) protein-coding genes. Finally, we explored the relatedness of Pongamia within the Fabaceae and showed the utility of the organellar genome sequences by mapping transcriptomic data to identify up- and down-regulated stress-responsive gene candidates and confirm in silico predicted RNA editing sites. PMID:23272141

  19. Capturing the Biofuel Wellhead and Powerhouse: The Chloroplast and Mitochondrial Genomes of the Leguminous Feedstock Tree Pongamia pinnata

    PubMed Central

    Kazakoff, Stephen H.; Imelfort, Michael; Edwards, David; Koehorst, Jasper; Biswas, Bandana; Batley, Jacqueline; Scott, Paul T.; Gresshoff, Peter M.

    2012-01-01

    Pongamia pinnata (syn. Millettia pinnata) is a novel, fast-growing arboreal legume that bears prolific quantities of oil-rich seeds suitable for the production of biodiesel and aviation biofuel. Here, we have used Illumina® ‘Second Generation DNA Sequencing (2GS)’ and a new short-read de novo assembler, SaSSY, to assemble and annotate the Pongamia chloroplast (152,968 bp; cpDNA) and mitochondrial (425,718 bp; mtDNA) genomes. We also show that SaSSY can be used to accurately assemble 2GS data, by re-assembling the Lotus japonicus cpDNA and in the process assemble its mtDNA (380,861 bp). The Pongamia cpDNA contains 77 unique protein-coding genes and is almost 60% gene-dense. It contains a 50 kb inversion common to other legumes, as well as a novel 6.5 kb inversion that is responsible for the non-disruptive, re-orientation of five protein-coding genes. Additionally, two copies of an inverted repeat firmly place the species outside the subclade of the Fabaceae lacking the inverted repeat. The Pongamia and L. japonicus mtDNA contain just 33 and 31 unique protein-coding genes, respectively, and like other angiosperm mtDNA, have expanded intergenic and multiple repeat regions. Through comparative analysis with Vigna radiata we measured the average synonymous and non-synonymous divergence of all three legume mitochondrial (1.59% and 2.40%, respectively) and chloroplast (8.37% and 8.99%, respectively) protein-coding genes. Finally, we explored the relatedness of Pongamia within the Fabaceae and showed the utility of the organellar genome sequences by mapping transcriptomic data to identify up- and down-regulated stress-responsive gene candidates and confirm in silico predicted RNA editing sites. PMID:23272141

  20. 35. DETAIL INTERIOR VIEW OF TILE DECORATION ON WALL OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    35. DETAIL INTERIOR VIEW OF TILE DECORATION ON WALL OF POWERHOUSE #1 ON LEVEL +55; THE WINDOWS LOOK OUT ON DISCHARGE CHANNEL DOWNSTREAM FROM POWERHOUSE. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  1. Northeast and northwest elevations. View to south Flint Creek ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Northeast and northwest elevations. View to south - Flint Creek Hydroelectric Project, Powerhouse, Approximately 3 miles southeast of Porters Corner on Powerhouse Road, Philipsburg, Granite County, MT

  2. Detail of door on southeast elevation. View to northwest ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Detail of door on southeast elevation. View to northwest - Flint Creek Hydroelectric Project, Powerhouse, Approximately 3 miles southeast of Porters Corner on Powerhouse Road, Philipsburg, Granite County, MT

  3. Evaluation of a Prototype Surface Flow Bypass for Juvenile Salmon and Steelhead at the Powerhouse of Lower Granite Dam, Snake River, Washington, 1996-2000

    SciTech Connect

    Johnson, Gary E.; Anglea, Steven M.; Adams, Noah S.; Wik, Timothy O.

    2005-02-28

    A surface flow bypass provides a route in the upper water column for naturally, surface-oriented juvenile salmonids to safely migrate through a hydroelectric dam. Surface flow bypasses were recommended in several regional salmon recovery plans as a means to increase passage survival of juvenile salmonids at Columbia and Snake River dams. A prototype surface flow bypass, called the SBC, was retrofit on Lower Granite Dam and evaluated from 1996 to 2000 using biotelemetry and hydroacoustic techniques. In terms of passage efficiency, the best SBC configurations were a surface skimmer (99 m3/s [3,500 cfs], three entrances 5 m wide, 5 m deep and one entrance 5 m wide, 15 m deep) and a single chute (99 m3/s, one entrance 5 m wide, 8.5 m deep). They each passed 62 ? 3% (95% confidence interval) of the total juvenile fish population that entered the section of the dam with the SBC entrances (Turbine Units 4-5). Smooth entrance shape and concentrated surface flow characteristics of these configurations are worth pursuing in designs for future surface flow bypasses. In addition, a guidance wall in the Lower Granite Dam forebay diverted the following percentages of juvenile salmonids away from Turbine Units 1-3 toward other passage routes, including the SBC: run-at-large 79 ? 18%; hatchery steelhead 86%; wild steelhead 65%; and yearling chinook salmon 66%. When used in combination with spill or turbine intake screens, a surface flow bypass with a guidance wall can produce a high level (> 90% of total project passage) of non-turbine passage and provide operational flexibility to fisheries managers and dam operators responsible for enhancing juvenile salmonid survival.

  4. Evaluation of a Behavioral Guidance Structure at Bonneville Dam Second Powerhouse including Passage Survival of Juvenile Salmon and Steelhead using Acoustic Telemetry, 2008

    SciTech Connect

    Faber, Derrek M.; Ploskey, Gene R.; Weiland, Mark A.; Deng, Zhiqun; Hughes, James S.; McComas, Roy L.; Kim, Jina; Townsend, R. L.; Fu, Tao; Skalski, J. R.; Fischer, Eric S.

    2010-02-12

    Summarizes research conducted at Bonneville Dam in 2008 to evaluate a prototype Behavioral Guidance Structure, that was deployed by the US Army Corps of Engineers in an effort to increase survival of outmigrating smolts at Bonneville Dam.

  5. 12. DETAIL EXTERIOR VIEW OF FISH PASSAGE BETWEEN THE SOUTH ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. DETAIL EXTERIOR VIEW OF FISH PASSAGE BETWEEN THE SOUTH END OF POWERHOUSE #1 AND NAVIGATION LOCK #1. - Bonneville Project, Navigation Lock No. 1, Oregon shore of Columbia River near first Powerhouse, Bonneville, Multnomah County, OR

  6. 76 FR 56189 - Symbiotics, LLC; Notice of Application Accepted for Filing, Soliciting Motions to Intervene and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-12

    ... powerhouse located on the northwest side of the existing concrete stilling basin with one generating unit... powerhouse draft tube to prevent non-native fish species from surviving Kaplan turbine passage into...

  7. Overview of interior showing turbine (center) and transformer (left). View ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Overview of interior showing turbine (center) and transformer (left). View to north-northwest - Flint Creek Hydroelectric Project, Powerhouse, Approximately 3 miles southeast of Porters Corner on Powerhouse Road, Philipsburg, Granite County, MT

  8. Southwest and southeast elevations (left) and Employee Housing (right). View ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Southwest and southeast elevations (left) and Employee Housing (right). View to north - Flint Creek Hydroelectric Project, Powerhouse, Approximately 3 miles southeast of Porters Corner on Powerhouse Road, Philipsburg, Granite County, MT

  9. View of east and south (rear) walls, water wheels and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of east and south (rear) walls, water wheels and generators, interior of Childs Powerhouse. Looking southeast - Childs-Irving Hydroelectric Project, Childs System, Childs Powerhouse, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ

  10. View of governor, water wheel, generator #1 and exciter (west ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of governor, water wheel, generator #1 and exciter (west end of Childs Powerhouse). Looking southeast - Childs-Irving Hydroelectric Project, Childs System, Childs Powerhouse, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ

  11. 26. DETAIL INTERIOR VIEW OF OIL AND WATER PIPE GALLERY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    26. DETAIL INTERIOR VIEW OF OIL AND WATER PIPE GALLERY ON LEVEL +77 OF POWERHOUSE #1. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  12. 23. GENERAL INTERIOR VIEW LOOKING DOWN THE LENGTH OF THE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    23. GENERAL INTERIOR VIEW LOOKING DOWN THE LENGTH OF THE OIL AND WATER PIPE GALLERY ON LEVEL +77 OF POWERHOUSE #1. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  13. 25. DETAIL INTERIOR VIEW OF THE OIL AND WATER PIPE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    25. DETAIL INTERIOR VIEW OF THE OIL AND WATER PIPE GALLERY ON LEVEL +77 OF POWERHOUSE #1. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  14. 11. DETAIL EXTERIOR VIEW OF EQUIPMENT AND FISH LIFTS BETWEEN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. DETAIL EXTERIOR VIEW OF EQUIPMENT AND FISH LIFTS BETWEEN POWERHOUSE #1 AND NAVIGATION LOCK #1; VIEW IS TAKEN FROM ROOF OF POWERHOUSE #1. - Bonneville Project, Navigation Lock No. 1, Oregon shore of Columbia River near first Powerhouse, Bonneville, Multnomah County, OR

  15. 7. William E. Barrett, Photographer, August 1975. LOG PONDS LOOKING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. William E. Barrett, Photographer, August 1975. LOG PONDS LOOKING WEST FROM POWERHOUSE ROOF. TRANSFORMER SHED IN FOREGROUND. - Meadow River Lumber Company, Highway 60, Rainelle, Greenbrier County, WV

  16. 9. FIRST FLOOR CAR BARN SPACE. VIEW TO NORTHWEST. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. FIRST FLOOR CAR BARN SPACE. VIEW TO NORTHWEST. - Commercial & Industrial Buildings, Key City Electric Street Railroad, Powerhouse & Storage Barn, Eighth & Washington Streets, Dubuque, Dubuque County, IA

  17. 11. Historic American Buildings Survey George Eisenman, Photographer Summer 1967 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. Historic American Buildings Survey George Eisenman, Photographer Summer 1967 STAIRS FROM K STREET ENTRANCE - Capital Traction Company Powerhouse, 3142 K Street Northwest, Washington, District of Columbia, DC

  18. 34. DETAIL INTERIOR VIEW OF MACHINE SHOP ON LEVEL +55 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    34. DETAIL INTERIOR VIEW OF MACHINE SHOP ON LEVEL +55 OF POWERHOUSE #1; CARLTON MACHINE TOOL CO DRILL IS IN LEFT FOREGROUND; SUDBURY MACHINE TOOL CO LATHES ARE IN BACKGROUND. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  19. 19. Heat Pump, view to the southwest. This system provides ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. Heat Pump, view to the southwest. This system provides ventilation air heating and cooling throughout the powerhouse. - Washington Water Power Clark Fork River Noxon Rapids Hydroelectric Development, Powerhouse, South bank of Clark Fork River at Noxon Rapids, Noxon, Sanders County, MT

  20. 3. VIEW ALONG FLUME TOWARD DOWNSTREAM SIDE OF BRIDGE AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. VIEW ALONG FLUME TOWARD DOWNSTREAM SIDE OF BRIDGE AND POWERHOUSE. FLUME IS FED FROM AFTERBAY OF POWERHOUSE. LOOKING NEAST-NORTHEAST. 90mm lens - Tule River Hydroelectric Complex, Tule River Bridge, Spanning North Fork of Middle Fork of Tule River, Springville, Tulare County, CA

  1. 78 FR 12050 - S. Martinez Livestock, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-21

    ... penstock; and (2) a powerhouse with a 5-MW Francis turbine-generator unit. The estimated annual generation... would include a pumped storage facility and a traditional turbine-generator facility. The pumped storage... Columbia River downstream of Priest Rapids Dam; (3) a powerhouse with five 400 megawatt (MW)...

  2. 75 FR 20589 - City of Oberlin, OH; Free Flow Power Missouri 1, LLC; Notice of Competing Preliminary Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-20

    ..., 71-foot-tall water intake structure; (2) a new 155-foot-wide, 189-foot-long powerhouse containing... project would consist of: (1) A new 225- foot-wide, 50-foot-long water intake structure equipped with trashracks, sluice gates, and intake gates; (2) a new 160-foot-wide, 140-foot-long powerhouse...

  3. 11. VIEW NORTH OF MACHINE SHOP IN BASEMENT OF OLD ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. VIEW NORTH OF MACHINE SHOP IN BASEMENT OF OLD POWERHOUSE, WITH PIPECUTTER (LEFT), DRILL PRESS LEFT (CENTER), AND GRINDER (RIGHT CENTER) BENEATH LINE SHAFTING) - Trenton Falls Hydroelectric Station, Powerhouse & Substation, On west bank of West Canada Creek, along Trenton Falls Road, 1.25 miles north of New York Route 28, Trenton Falls, Oneida County, NY

  4. 76 FR 18541 - Wediko Children's Services; Notice of Declaration of Intention and Soliciting Comments, Protests...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-04

    ... alignment to the powerhouse; (4) a proposed powerhouse, containing a 16-18-kW turbine, switchgear, and... Wediko Children's Services Hydroelectric Project will be located on Black Pond Brook, near the town of... number (DI11-4-000) on any comments, protests, and/or motions filed. k. Description of Project: The...

  5. 14. DETAIL EXTERIOR VIEW LOOKING NORTHWEST, SHOWING CONTROL HOUSE AT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. DETAIL EXTERIOR VIEW LOOKING NORTHWEST, SHOWING CONTROL HOUSE AT UPSTREAM END OF NAVIGATION LOCK #1; POWERHOUSE #1 IS PARTIALLY VISIBLE IN BACKGROUND. - Bonneville Project, Navigation Lock No. 1, Oregon shore of Columbia River near first Powerhouse, Bonneville, Multnomah County, OR

  6. 13. DETAIL EXTERIOR VIEW LOOKING NORTH, SHOWING TOP OF MITER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. DETAIL EXTERIOR VIEW LOOKING NORTH, SHOWING TOP OF MITER GATES AT DOWNSTREAM END OF NAVIGATION LOCK #1; POWERHOUSE #1 IS VISIBLE IN BACKGROUND. - Bonneville Project, Navigation Lock No. 1, Oregon shore of Columbia River near first Powerhouse, Bonneville, Multnomah County, OR

  7. 8. GENERAL EXTERIOR VIEW LOOKING NORTHWEST TOWARD UPSTREAM END OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. GENERAL EXTERIOR VIEW LOOKING NORTHWEST TOWARD UPSTREAM END OF NAVIGATION LOCK #1; SOUTH END OF POWERHOUSE #1 IS VISIBLE ON RIGHT; BRADFORD SLOUGH IS VISIBLE IN FOREGROUND. - Bonneville Project, Navigation Lock No. 1, Oregon shore of Columbia River near first Powerhouse, Bonneville, Multnomah County, OR

  8. 15. DETAIL INTERIOR VIEW OF CONTROL HOUSE FOR NAVIGATION LOCK ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. DETAIL INTERIOR VIEW OF CONTROL HOUSE FOR NAVIGATION LOCK #1. Photograph Nos. OR-11-D-16 through OR-11-D-27 are photocopies of photographs. Original historic photographs are located at the Bonneville Powerhouse, Bonneville, Oregon. - Bonneville Project, Navigation Lock No. 1, Oregon shore of Columbia River near first Powerhouse, Bonneville, Multnomah County, OR

  9. 1. GENERAL EXTERIOR VIEW LOOKING SOUTHWEST, SHOWING DOWNSTREAM END OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. GENERAL EXTERIOR VIEW LOOKING SOUTHWEST, SHOWING DOWNSTREAM END OF NAVIGATION LOCK #1 WITH CHAMBER FILLED; THE CONTROL HOUSE IS ON RIGHT; VIEW IS TAKEN FROM ROOF OF POWERHOUSE #1. - Bonneville Project, Navigation Lock No. 1, Oregon shore of Columbia River near first Powerhouse, Bonneville, Multnomah County, OR

  10. 78 FR 66910 - Notice of Competing Preliminary Permit Applications Accepted for Filing and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-07

    ... concrete powerhouse containing two turbine-generators each rated at 25 megawatts (MW) for a total installed... Operations, American Municipal Power, Inc., 1111 Schrock Road, Suite 100, Columbus, OH 43229, phone 614-540... structure; (2) a 160-foot-wide, 140-foot-long concrete powerhouse containing three turbine-generators...

  11. 1. Sheeler redact: Lower east/west conveyor from wharf carried coke ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Sheeler redact: Lower east/west conveyor from wharf carried coke to highline for blast furnaces; upper south/north conveyor carried coal to GG; double window carried coal to powerhouse pulverizer building for powerhouse in background. Looking north/northeast - Rouge Steel Company, 3001 Miller Road, Dearborn, MI

  12. 106. Photocopy of original construction drawing, dated 7 December 1934 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    106. Photocopy of original construction drawing, dated 7 December 1934 (Original print in the possession of U.S. Army Corps of Engineers, Portland District, Portland, OR.) (P-5-311) POWERHOUSE, 60,000 H.P DRAFT TUBE DESIGN. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  13. 18. Photocopy of photograph showing foundation framing of South Bank ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. Photocopy of photograph showing foundation framing of South Bank Substation, 11 June 1939 (from the BPA Photo Archives, Negative No. 347), LOOKING NORTH WITH THE BONNEVILLE DAM POWERHOUSE IN BACKGROUND - Bonneville Power Administration South Bank Substation, I-84, South of Bonneville Dam Powerhouse, Bonneville, Multnomah County, OR

  14. 20. Photocopy of photograph showing the completed South Bank Substation, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. Photocopy of photograph showing the completed South Bank Substation, 4 November 1939 (from the BPA Photo Archives, Negative No. 6556), LOOKING NORTHWEST WITH THE BONNEVILLE DAM POWERHOUSE AND TRANSMISSION TOWERS IN BACKGROUND - Bonneville Power Administration South Bank Substation, I-84, South of Bonneville Dam Powerhouse, Bonneville, Multnomah County, OR

  15. 19. Photocopy of photograph showing framing of concrete walls of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. Photocopy of photograph showing framing of concrete walls of South Bank Substation, 18 July 1939 (from the BPA Photo Archives, Negative No. 365), LOOKING NORTHWEST WITH THE BONNEVILLE DAM POWERHOUSE IN BACKGROUND - Bonneville Power Administration South Bank Substation, I-84, South of Bonneville Dam Powerhouse, Bonneville, Multnomah County, OR

  16. 75 FR 21286 - Bowersock Mills and Power Company; Notice of Application Accepted for Filing, Soliciting Motions...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-23

    ... operated in a run-of-river mode, where water levels in the reservoir would be maintained near the top of... Kansas River Hydropower Project. f. Location: The project would be located on the Kansas River in Douglas... existing powerhouse on the South bank of the Kansas River, and a proposed powerhouse on the North bank...

  17. 14. DETAIL EXTERIOR VIEW LOOKING WEST, SHOWING TRANSFORMER UNITS ON ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. DETAIL EXTERIOR VIEW LOOKING WEST, SHOWING TRANSFORMER UNITS ON THE UPSTREAM SIDE OF POWERHOUSE #1; THE THREE TRANSFORMERS SHOWN WORK IN CONCERT WITH ONE ANOTHER TO RAISE THE VOLTAGE OF THREE-PHASE ALTERNATING CURRENT PRODUCED BY THE GENERATORS. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  18. 6. UPSTREAM VIEW OF THE SPILLWAY OF THE POST FALLS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. UPSTREAM VIEW OF THE SPILLWAY OF THE POST FALLS POWERHOUSE, WITH A PARTIAL VIEW OF THE MODERN TRANSFORMER IN THE FOREGROUND, AND THE OLD SWITCHING BUILDING IN THE LEFT BACKGROUND, LOOKING SOUTHEAST. - Washington Water Power Company Post Falls Power Plant, Middle Channel Powerhouse & Dam, West of intersection of Spokane & Fourth Streets, Post Falls, Kootenai County, ID

  19. 8. LEFT FACADE VIEW OF THE OLD SWITCHING BUILDING, WITH ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. LEFT FACADE VIEW OF THE OLD SWITCHING BUILDING, WITH THE POWERHOUSE AND DAM IN LEFT BACKGROUND, LOOKING NORTHWEST. - Washington Water Power Company Post Falls Power Plant, Middle Channel Powerhouse & Dam, West of intersection of Spokane & Fourth Streets, Post Falls, Kootenai County, ID

  20. 76 FR 13174 - Pacific Gas and Electric Company; Notice of Application Tendered for Filing With the Commission...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-10

    ...: Pacific Gas and Electric Company. e. Name of Project: French Meadows Transmission Line Project. f. Location: The French Meadows Transmission Line Project is located in Placer County, California, within the....27 miles from PCWA's French Meadows powerhouse switchyard to PCWA's Middle Fork powerhouse...

  1. 5. UPSTREAM VIEW OF THE TRASH RAKES, GATES AND GATELIFTING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. UPSTREAM VIEW OF THE TRASH RAKES, GATES AND GATE-LIFTING MECHANISMS FOR THE POST FALLS DAM AND POWERHOUSE, LOOKING NORTHWEST. - Washington Water Power Company Post Falls Power Plant, Middle Channel Powerhouse & Dam, West of intersection of Spokane & Fourth Streets, Post Falls, Kootenai County, ID

  2. 10. CLOSEUP VIEW OF THE TRASH RAKES, THEIR LIFTING MECHANISM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. CLOSE-UP VIEW OF THE TRASH RAKES, THEIR LIFTING MECHANISM (RIGHT FOREGROUND), AND CLUTCHES THAT OPEN AND CLOSE THE SIX INTAKE GATES ON THE POST FALLS POWERHOUSE, LOOKING WEST. - Washington Water Power Company Post Falls Power Plant, Middle Channel Powerhouse & Dam, West of intersection of Spokane & Fourth Streets, Post Falls, Kootenai County, ID

  3. 19. DETAIL TO SOUTHEAST OF EXCITER 1 GIRARD TURBINE, SHOWING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. DETAIL TO SOUTHEAST OF EXCITER 1 GIRARD TURBINE, SHOWING BEVEL-GEARED REGISTER GATE CONTROLS, OLD POWERHOUSE BASEMENT - Trenton Falls Hydroelectric Station, Powerhouse & Substation, On west bank of West Canada Creek, along Trenton Falls Road, 1.25 miles north of New York Route 28, Trenton Falls, Oneida County, NY

  4. View of water wheel, generator #3 and exciter (at east ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of water wheel, generator #3 and exciter (at east end of Childs Powerhouse) on a single shaft. In foreground the governor and shut-off valve are visible. Looking southwest - Childs-Irving Hydroelectric Project, Childs System, Childs Powerhouse, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ

  5. Hydroacoustic Assessment of Downstream Migrating Salmonids at Lower Monumental Dam in Spring, 1985 Final Report.

    SciTech Connect

    Johnson, Ward R.

    1985-12-01

    The primary objective of this study was to estimate the effectiveness of the spillway in passing migrants, with the spillway operating per the criteria identified in the COE's 1985 Juvenile Fish Passage Plan. Specific study objectives were to estimate: (1) the effectiveness of the spillway for Passing migrants; (2) die1 variability in passage rates of migrants through the powerhouse and the spillway; (3) the daily and cumulative run timing of migrant passage; (4) the proportions of migrants that passed through each turbine intake and spill bay (i.e., the horizontal distributions across the powerhouse and the spillway); and (5) the vertical distributions of migrants approaching the powerhouse and spillway.

  6. 9 CFR 317.2 - Labels: definition; required features.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... has been removed. Spices include the spices listed in 21 CFR 182.10, and 184. (B) The term “natural... contains the flavoring constituents derived from a spice, fruit or fruit juice, vegetable or vegetable juice, edible yeast, herb, bark, bud, root, leaf or any other edible portion of a plant, meat,...

  7. 9 CFR 317.2 - Labels: definition; required features.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... has been removed. Spices include the spices listed in 21 CFR 182.10, and 184. (B) The term “natural... contains the flavoring constituents derived from a spice, fruit or fruit juice, vegetable or vegetable juice, edible yeast, herb, bark, bud, root, leaf or any other edible portion of a plant, meat,...

  8. 9 CFR 317.2 - Labels: definition; required features.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... has been removed. Spices include the spices listed in 21 CFR 182.10, and 184. (B) The term “natural... contains the flavoring constituents derived from a spice, fruit or fruit juice, vegetable or vegetable juice, edible yeast, herb, bark, bud, root, leaf or any other edible portion of a plant, meat,...

  9. 9 CFR 317.2 - Labels: definition; required features.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... has been removed. Spices include the spices listed in 21 CFR 182.10, and 184. (B) The term “natural... contains the flavoring constituents derived from a spice, fruit or fruit juice, vegetable or vegetable juice, edible yeast, herb, bark, bud, root, leaf or any other edible portion of a plant, meat,...

  10. A Funny Thing Happened on the Way to Translation

    ERIC Educational Resources Information Center

    Howard, Jennifer

    2006-01-01

    Amy Richlin, a professor of classics at the University of California at Los Angeles, has just translated "Poenulus," a comedy likely written between 224 B.C. and 184 B.C. by the Roman playwright Plautus. To make the comedy comprehensible for modern audiences, Richlin came up with with a bolder and deliberately controversial approach: Seek out…

  11. 40 CFR 421.53 - Effluent limitations guidelines representing the degree of effluent reduction attainable by the...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    .... Except as provided in 40 CFR 125.30 through 125.32, any existing point source subject to this subpart... .304 Nickel .274 .184 (b) Subpart E—Anode and Cathode Rinse. BAT Effluent Limitations Pollutant or... cathode copper production Arsenic .000 .000 Copper .000 .000 Nickel .000 .000 (c) Subpart...

  12. 40 CFR 421.53 - Effluent limitations guidelines representing the degree of effluent reduction attainable by the...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    .... Except as provided in 40 CFR 125.30 through 125.32, any existing point source subject to this subpart... .304 Nickel .274 .184 (b) Subpart E—Anode and Cathode Rinse. BAT Effluent Limitations Pollutant or... cathode copper production Arsenic .000 .000 Copper .000 .000 Nickel .000 .000 (c) Subpart...

  13. 40 CFR 421.53 - Effluent limitations guidelines representing the degree of effluent reduction attainable by the...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    .... Except as provided in 40 CFR 125.30 through 125.32, any existing point source subject to this subpart... .304 Nickel .274 .184 (b) Subpart E—Anode and Cathode Rinse. BAT Effluent Limitations Pollutant or... cathode copper production Arsenic .000 .000 Copper .000 .000 Nickel .000 .000 (c) Subpart...

  14. 40 CFR 421.56 - Pretreatment standards for new sources.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Refining Subcategory § 421.56 Pretreatment standards for new sources. Except as provided in 40 CFR 403.7... works must comply with 40 CFR part 403 and achieve the following pretreatment standards for new sources... pounds) of copper cast Arsenic .692 .309 Copper .638 .304 Nickel .274 .184 (b) Subpart E—Anode...

  15. 40 CFR 421.56 - Pretreatment standards for new sources.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Refining Subcategory § 421.56 Pretreatment standards for new sources. Except as provided in 40 CFR 403.7... works must comply with 40 CFR part 403 and achieve the following pretreatment standards for new sources... pounds) of copper cast Arsenic .692 .309 Copper .638 .304 Nickel .274 .184 (b) Subpart E—Anode...

  16. 40 CFR 421.56 - Pretreatment standards for new sources.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Refining Subcategory § 421.56 Pretreatment standards for new sources. Except as provided in 40 CFR 403.7... works must comply with 40 CFR part 403 and achieve the following pretreatment standards for new sources... pounds) of copper cast Arsenic .692 .309 Copper .638 .304 Nickel .274 .184 (b) Subpart E—Anode...

  17. 40 CFR 421.56 - Pretreatment standards for new sources.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Refining Subcategory § 421.56 Pretreatment standards for new sources. Except as provided in 40 CFR 403.7... works must comply with 40 CFR part 403 and achieve the following pretreatment standards for new sources... pounds) of copper cast Arsenic .692 .309 Copper .638 .304 Nickel .274 .184 (b) Subpart E—Anode...

  18. 40 CFR 421.53 - Effluent limitations guidelines representing the degree of effluent reduction attainable by the...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... Except as provided in 40 CFR 125.30 through 125.32, any existing point source subject to this subpart... .304 Nickel .274 .184 (b) Subpart E—Anode and Cathode Rinse. BAT Effluent Limitations Pollutant or... cathode copper production Arsenic .000 .000 Copper .000 .000 Nickel .000 .000 (c) Subpart...

  19. 40 CFR 421.56 - Pretreatment standards for new sources.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Refining Subcategory § 421.56 Pretreatment standards for new sources. Except as provided in 40 CFR 403.7... works must comply with 40 CFR part 403 and achieve the following pretreatment standards for new sources... pounds) of copper cast Arsenic .692 .309 Copper .638 .304 Nickel .274 .184 (b) Subpart E—Anode...

  20. 40 CFR 421.53 - Effluent limitations guidelines representing the degree of effluent reduction attainable by the...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    .... Except as provided in 40 CFR 125.30 through 125.32, any existing point source subject to this subpart... .304 Nickel .274 .184 (b) Subpart E—Anode and Cathode Rinse. BAT Effluent Limitations Pollutant or... cathode copper production Arsenic .000 .000 Copper .000 .000 Nickel .000 .000 (c) Subpart...

  1. 28. Photocopied 1973 from The Rig & Reel Magazine, (March, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    28. Photocopied 1973 from The Rig & Reel Magazine, (March, 1923) p. 2. INTERIOR OF CENTRAL POWERHOUSE AT VOLCANO - NOW DISMANTLED. - West Oil Company Endless Wire Pumping Station, U.S. Route 50 (Volcano vicinity), Petroleum, Ritchie County, WV

  2. 22. Fire Protection Water Pump (low pressure), view to the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    22. Fire Protection Water Pump (low pressure), view to the southwest. - Washington Water Power Clark Fork River Cabinet Gorge Hydroelectric Development, Powerhouse, North Bank of Clark Fork River at Cabinet Gorge, Cabinet, Bonner County, ID

  3. 14. Generator Fire Protection for Unit 5 (low pressure), view ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. Generator Fire Protection for Unit 5 (low pressure), view to the southeast. - Washington Water Power Clark Fork River Noxon Rapids Hydroelectric Development, Powerhouse, South bank of Clark Fork River at Noxon Rapids, Noxon, Sanders County, MT

  4. 80. VIEW OF PLACING WHEELS IN SHAFT OF NO. 2 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    80. VIEW OF PLACING WHEELS IN SHAFT OF NO. 2 UNIT IN POSITION. OVERVIEW LOOKING EAST IN THE POWERHOUSE, Print No. 234, April 1904 - Electron Hydroelectric Project, Along Puyallup River, Electron, Pierce County, WA

  5. 16. GENERAL EXTERIOR VIEW LOOKING NORTHWEST, SHOWING TRANSMISSION TOWERS ON ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. GENERAL EXTERIOR VIEW LOOKING NORTHWEST, SHOWING TRANSMISSION TOWERS ON WEST END OF BRADFORD ISLAND; BRADFORD SLOUGH DOWNSTREAM FROM POWERHOUSE #1 IS IN FOREGROUND. - Bonneville Project, Bonneville Dam, Columbia River, Bonneville, Multnomah County, OR

  6. 4. DETAIL VIEW OF LIFTING GEAR ON MULE AND RACK ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. DETAIL VIEW OF LIFTING GEAR ON MULE AND RACK ATTACHMENT BOOKS, LOOKING EAST - Nine Mile Hydroelectric Development, Powerhouse, State Highway 291 along Spokane River, Nine Mile Falls, Spokane County, WA

  7. 75 FR 20988 - City of Sandpoint; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-22

    ... running from the dam to the water treatment plant will act as the project's penstock; (4) a powerhouse next to the water treatment plant containing a Pelton turbine and a 65-kilowatt generator; and...

  8. 75 FR 65311 - Renew Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-22

    ...-mile-long, aqueduct from Boonton Reservoir Dam to the Jersey City Water Treatment Plant; (2) two 48... transmission line from the powerhouse to the Township of Boonton's Waste Treatment Plant's control room;...

  9. 27. Generator Voltage Regulator Cabinet Interior for Unit 1, view ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    27. Generator Voltage Regulator Cabinet Interior for Unit 1, view to the northwest. - Washington Water Power Clark Fork River Noxon Rapids Hydroelectric Development, Powerhouse, South bank of Clark Fork River at Noxon Rapids, Noxon, Sanders County, MT

  10. 6. Main Control Switchboard (north end interior), view to the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. Main Control Switchboard (north end interior), view to the southwest. - Washington Water Power Clark Fork River Noxon Rapids Hydroelectric Development, Powerhouse, South bank of Clark Fork River at Noxon Rapids, Noxon, Sanders County, MT

  11. 29. SAR2, VIEW TO NORTH WITH EXCITERS AT LEFT. SCE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    29. SAR-2, VIEW TO NORTH WITH EXCITERS AT LEFT. SCE negative no. 1043, photographed June 6, 1912. Photograph by G. Haven Bishop. - Santa Ana River Hydroelectric System, SAR-2 Powerhouse, Redlands, San Bernardino County, CA

  12. 4. NORTH ELEVATION, SHOWING ADMINISTRATIVE OFFICES AT LEFT REAR, AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. NORTH ELEVATION, SHOWING ADMINISTRATIVE OFFICES AT LEFT REAR, AND SWITCH RACK AT RIGHT REAR. VIEW TO SOUTH-SOUTHEAST. - Santa Ana River Hydroelectric System, SAR-3 Powerhouse, San Bernardino National Forest, Redlands, San Bernardino County, CA

  13. 2. WEST ELEVATION, SHOWING TAILRACE AND SLIDING DOOR UNDER SHED ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. WEST ELEVATION, SHOWING TAILRACE AND SLIDING DOOR UNDER SHED ROOF. ADMINISTRATIVE OFFICE IS IN BACKGROUND AT RIGHT. VIEW TO EAST-NORTHEAST. - Santa Ana River Hydroelectric System, SAR-3 Powerhouse, San Bernardino National Forest, Redlands, San Bernardino County, CA

  14. 76 FR 30936 - West Maui Pumped Storage Water Supply, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-27

    ... supply project effluent water to an existing irrigation system; (5) a powerhouse with two 15-megawatt... prior registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp . You...

  15. Historic view of penstock repair following 1910's landslide just east ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Historic view of penstock repair following 1910's landslide just east of powerhouse; looking east. (photographer unknown, ca. 1910's) - Nooksack Falls Hydroelectric Plant, Route 542, Glacier, Whatcom County, WA

  16. 24. BEDROOM #1 INTERIOR SHOWING OPEN DOOR TO HALL WITH ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    24. BEDROOM #1 INTERIOR SHOWING OPEN DOOR TO HALL WITH HALL LINEN CLOSETS VISIBLE IN BACKGROUND, AND PARTIALLY OPEN DOOR TO CLOSET. VIEW TO EAST. - Big Creek Hydroelectric System, Powerhouse 8, Operator Cottage, Big Creek, Big Creek, Fresno County, CA

  17. 12. GENERATING UNIT NO. 2, WITH (LR) CONTINUOUS CURRENT EXCITER, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. GENERATING UNIT NO. 2, WITH (L-R) CONTINUOUS CURRENT EXCITER, ALTERNATING CURRENT GENERATOR, AND TURBINE GOVERNOR. VIEW TO SOUTH. - Cooke Hydroelectric Plant, Powerhouse, Cook Dam Road at Au Sable River, Oscoda, Iosco County, MI

  18. 14. Credit JTL. View of north and west elevations of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. Credit JTL. View of north and west elevations of powerhouse and switch house. Note water-cooled transformers. - Battle Creek Hydroelectric System, Battle Creek & Tributaries, Red Bluff, Tehama County, CA

  19. 57. Credit LRC. West elevation during construction. Note narrowgauge railroad ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    57. Credit LRC. West elevation during construction. Note narrow-gauge railroad entering main door of powerhouse. Photo c. 1910. - Battle Creek Hydroelectric System, Battle Creek & Tributaries, Red Bluff, Tehama County, CA

  20. 64. Credit JTL. West and south elevations from across South ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    64. Credit JTL. West and south elevations from across South Battle Creek. Note penstock descending hill in background and new powerhouse construction in foreground. - Battle Creek Hydroelectric System, Battle Creek & Tributaries, Red Bluff, Tehama County, CA

  1. 77 FR 25998 - Carbon Zero, LLC; Notice of Application Accepted for Filing With the Commission, Intent To Waive...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-02

    ...-diameter minimum flow valve in the powerhouse discharging water into an existing 35-foot-wide, 50-foot...- wide minimum flow weir equipped with stop logs; (4) an existing 2,400- foot-long, 6.4-acre...

  2. Cost and design study of modular small hydro plants. Volume 2. Appendixes. Final report

    SciTech Connect

    Pereira, L.

    1984-06-01

    The following appendices are included: major mechanical equipment and auxiliary electrical equipment for pumps as turbines (PAT), siphon penstock, prefabricated powerhouse, reliability of PAT installations, representative site investigation data, and case studies of four sites. (MHR)

  3. 11. DETAIL VIEW OF GENERATOR NO. 1, GENERATOR ROOM, SHOWING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. DETAIL VIEW OF GENERATOR NO. 1, GENERATOR ROOM, SHOWING GRAVITY LUBRICATING OIL BOX ABOVE GENERATOR - Nine Mile Hydroelectric Development, Powerhouse, State Highway 291 along Spokane River, Nine Mile Falls, Spokane County, WA

  4. 73. photographer unknown 9 January 1936 TOP OF DRAFT TUBE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    73. photographer unknown 9 January 1936 TOP OF DRAFT TUBE LINER AND SPEED RING PIERS. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  5. 10. INTERIOR VIEW TO WEST, SHOWING EXCITER, RHEOSTATS, DISCONNECT PANEL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. INTERIOR VIEW TO WEST, SHOWING EXCITER, RHEOSTATS, DISCONNECT PANEL WITH BUS ABOVE, AND OPERATOR'S DESK. - Santa Ana River Hydroelectric System, SAR-2 Powerhouse, Redlands, San Bernardino County, CA

  6. 159. Credit PG&E. Using mules and horses to transport generator ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    159. Credit PG&E. Using mules and horses to transport generator base plate from Anderson, CA, to Northern California's Kilarc powerhouse, c. 1903. - Battle Creek Hydroelectric System, Battle Creek & Tributaries, Red Bluff, Tehama County, CA

  7. 6. Photocopy of print (from Niagara Power, Volume II, p. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. Photocopy of print (from Niagara Power, Volume II, p. 19) Delineator and date unknown DIAGRAM OF INLET-CANAL, POWER-HOUSES AND TUNNEL - Edward D. Adams Station Power Plant, Niagara River & Buffalo Avenue, Niagara Falls, Niagara County, NY

  8. 51. LOOKING NORTHEAST AT EIMCO WASTE WATER TREATMENT THICKENER No. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    51. LOOKING NORTHEAST AT EIMCO WASTE WATER TREATMENT THICKENER No. 2, ELECTRIC POWERHOUSE No. 2, AND OUTDOOR ELECTRICAL SUBSTATION IN BACKGROUND. (Jet Lowe) - U.S. Steel Duquesne Works, Blast Furnace Plant, Along Monongahela River, Duquesne, Allegheny County, PA

  9. 76 FR 76155 - Nevada Hydro Company, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-06

    ... powerhouse with two reversible pump-turbine units with a total installed capacity of 600 megawatts; (3) the... the proposed project and to an existing San Diego Gas & Electric Company transmission line located...

  10. VIEW LOOKING SOUTHEAST AT ROUTE 133, SHOWING A CORNER DETAIL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW LOOKING SOUTHEAST AT ROUTE 133, SHOWING A CORNER DETAIL OF THE POWERHOUSE AND A SECTION OF THE SWITCHYARD. - Wilson Dam & Hydroelectric Plant, Spanning Tennessee River at Wilson Dam Road (Route 133), Muscle Shoals, Colbert County, AL

  11. CLOSEUP VIEW OF THE SWITCHYARD TERMINALS AND THE WEST ELEVATION ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CLOSE-UP VIEW OF THE SWITCHYARD TERMINALS AND THE WEST ELEVATION OF THE POWERHOUSE. - Wilson Dam & Hydroelectric Plant, Spanning Tennessee River at Wilson Dam Road (Route 133), Muscle Shoals, Colbert County, AL

  12. VIEW LOOKING EAST SHOWING THE SWITCHYARD AND THE WEST ELEVATION ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW LOOKING EAST SHOWING THE SWITCHYARD AND THE WEST ELEVATION OF THE POWERHOUSE. - Wilson Dam & Hydroelectric Plant, Spanning Tennessee River at Wilson Dam Road (Route 133), Muscle Shoals, Colbert County, AL

  13. 31. REAR OF CAR BARN DURING RECONSTRUCTION: Photocopy of July ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    31. REAR OF CAR BARN DURING RECONSTRUCTION: Photocopy of July 1908 photograph showing west rear of powerhouse and car barn. View from the north. - San Francisco Cable Railway, Washington & Mason Streets, San Francisco, San Francisco County, CA

  14. 9. DETAIL EXTERIOR VIEW LOOKING SOUTHEAST, SHOWING DOWNSTREAM MITER GATES ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. DETAIL EXTERIOR VIEW LOOKING SOUTHEAST, SHOWING DOWNSTREAM MITER GATES FOR NAVIGATION LOCK #1. - Bonneville Project, Navigation Lock No. 1, Oregon shore of Columbia River near first Powerhouse, Bonneville, Multnomah County, OR

  15. 2. GENERAL EXTERIOR VIEW LOOKING WEST, SHOWING CHANNEL DOWNSTREAM FROM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. GENERAL EXTERIOR VIEW LOOKING WEST, SHOWING CHANNEL DOWNSTREAM FROM NAVIGATION LOCK #1; MOVABLE BRIDGE IS VISIBLE IN LEFT FOREGROUND. - Bonneville Project, Navigation Lock No. 1, Oregon shore of Columbia River near first Powerhouse, Bonneville, Multnomah County, OR

  16. 14. LIVING ROOM INTERIOR SHOWING WEST SIDE AND SOUTH END ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. LIVING ROOM INTERIOR SHOWING WEST SIDE AND SOUTH END DOUBLE FRENCH DOORS, AND FIBERBOARD WALLS. VIEW TO SOUTHWEST. - Big Creek Hydroelectric System, Powerhouse 8, Operator Cottage, Big Creek, Big Creek, Fresno County, CA

  17. 12. INTERIOR OF NORTH END ENCLOSED SCREEN PORCH. DOUBLE FRENCH ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. INTERIOR OF NORTH END ENCLOSED SCREEN PORCH. DOUBLE FRENCH DOORS LEAD TO BEDROOM #3. VIEW TO EAST. - Big Creek Hydroelectric System, Powerhouse 8, Operator Cottage, Big Creek, Big Creek, Fresno County, CA

  18. 16. DINING ROOM INTERIOR SHOWING DOUBLE DOOR ARCHWAY INTO LIVING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. DINING ROOM INTERIOR SHOWING DOUBLE DOOR ARCHWAY INTO LIVING ROOM AND DOUBLE FRENCH DOORS INTO SOUTH END SCREENED PORCH. VIEW TO SOUTHWEST. - Big Creek Hydroelectric System, Powerhouse 8, Operator Cottage, Big Creek, Big Creek, Fresno County, CA

  19. 27. BEDROOM #2 INTERIOR SHOWING DOUBLE FRENCH DOORS TO SCREENED ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    27. BEDROOM #2 INTERIOR SHOWING DOUBLE FRENCH DOORS TO SCREENED PORCH AND UNUSUAL WINDOWED CLOSET THROUGH OPEN FIVE-PANELED DOOR. VIEW TO WEST. - Big Creek Hydroelectric System, Powerhouse 8, Operator Cottage, Big Creek, Big Creek, Fresno County, CA

  20. 29. BEDROOM #3 INTERIOR SHOWING DOUBLE FRENCH DOORS TO SCREENED ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    29. BEDROOM #3 INTERIOR SHOWING DOUBLE FRENCH DOORS TO SCREENED PORCH AND FIVE-PANELED DOOR TO HALL. VIEW TO WEST. - Big Creek Hydroelectric System, Powerhouse 8, Operator Cottage, Big Creek, Big Creek, Fresno County, CA

  1. 31. HALL INTERIOR SHOWING SINGLE FRENCH DOOR TO NORTH SIDE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    31. HALL INTERIOR SHOWING SINGLE FRENCH DOOR TO NORTH SIDE SCREENED PORCH, AND TRAP-DOOR ACCESS TO ATTIC. VIEW TO NORTHEAST. - Big Creek Hydroelectric System, Powerhouse 8, Operator Cottage, Big Creek, Big Creek, Fresno County, CA

  2. 75 FR 27548 - Quality GearBox, LLC; Notice of Competing Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-17

    ...-long gravity dam; (2) an existing 19-acre impoundment with a storage capacity of 133 acre feet; (3) an existing filtration plant to be converted into a powerhouse with three new turbine- generator units for...

  3. 77 FR 37037 - Crown Hydro LLC; Notice of Initiation of Proceeding To Terminate License By Implied Surrender and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-20

    ... intake tunnel; a powerhouse located at the basement of the Crown Roller Mill Building and containing two hydropower units with a total capacity of 3.4 MW; an existing tailrace tunnel and a reconstructed...

  4. 77 FR 5786 - PacifiCorp; Notice of Application Accepted for Filing and Soliciting Comments, Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-06

    ... Project: Granite Hydroelectric Project. f. Location: The proposed Granite Project would be located on a.... Description of Project: The Granite Project would consist of: (1) A proposed powerhouse containing...

  5. 7. VIEW DOWNSTREAM FROM THE NEWHALEM INTAKE WITH NO WATER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. VIEW DOWNSTREAM FROM THE NEWHALEM INTAKE WITH NO WATER BEING DIVERTED TO THE POWER TUNNEL, 1989. - Skagit Power Development, Newhalem Powerhouse & Dam, On Skagit River, 0.3 mile downstream from Newhalem, Newhalem, Whatcom County, WA

  6. 19. Credit Pelton Water Wheel Company. Photocopy of drawing (perspective) ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. Credit Pelton Water Wheel Company. Photocopy of drawing (perspective) showing layout of powerhouse in 1901. (Pelton Water Wheel Company, Catalog, 11th ed., 1909, p. 75). - Battle Creek Hydroelectric System, Battle Creek & Tributaries, Red Bluff, Tehama County, CA

  7. 11. EXCITER, REACTION TURBINE, AND PENSTOCK/TAILRACE CONNECTOR PIPES. VIEW TO ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. EXCITER, REACTION TURBINE, AND PENSTOCK/TAILRACE CONNECTOR PIPES. VIEW TO NORTHWEST. - Santa Ana River Hydroelectric System, SAR-3 Powerhouse, San Bernardino National Forest, Redlands, San Bernardino County, CA

  8. 33 CFR Appendix A to Part 221 - Part 16-Procedures Relating to Takeover and Relicensing of Licensed Projects

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... number; (d) type of principal project works licensed, e.g., dam and reservoir, powerhouse, transmission... for the removal or other disposition of power facilities of the project. A “non-power license”...

  9. 33 CFR Appendix A to Part 221 - Part 16-Procedures Relating to Takeover and Relicensing of Licensed Projects

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... number; (d) type of principal project works licensed, e.g., dam and reservoir, powerhouse, transmission... for the removal or other disposition of power facilities of the project. A “non-power license”...

  10. 33 CFR Appendix A to Part 221 - Part 16-Procedures Relating to Takeover and Relicensing of Licensed Projects

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... number; (d) type of principal project works licensed, e.g., dam and reservoir, powerhouse, transmission... for the removal or other disposition of power facilities of the project. A “non-power license”...

  11. 33 CFR Appendix A to Part 221 - Part 16-Procedures Relating to Takeover and Relicensing of Licensed Projects

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... number; (d) type of principal project works licensed, e.g., dam and reservoir, powerhouse, transmission... for the removal or other disposition of power facilities of the project. A “non-power license”...

  12. 33 CFR Appendix A to Part 221 - Part 16-Procedures Relating to Takeover and Relicensing of Licensed Projects

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... number; (d) type of principal project works licensed, e.g., dam and reservoir, powerhouse, transmission... for the removal or other disposition of power facilities of the project. A “non-power license”...

  13. 49. INTERIOR OF GILLEY ROOM: Interior view towards southeast of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    49. INTERIOR OF GILLEY ROOM: Interior view towards southeast of the Gilley Room on the second floor of the powerhouse and ear barn. - San Francisco Cable Railway, Washington & Mason Streets, San Francisco, San Francisco County, CA

  14. 3. View of east elevation of original section of Langdale ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. View of east elevation of original section of Langdale Cotton Mill, looking southwest from walk to powerhouse across channel. - Langdale Cotton Mill, 5910 Nineteenth Avenue, Valley, Chambers County, AL

  15. 12. FIRST FLOOR CAR BARN SPACE, SHOWING COLUMNS AND ROOF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. FIRST FLOOR CAR BARN SPACE, SHOWING COLUMNS AND ROOF STRUCTURE. VIEW TO SOUTHEAST. - Commercial & Industrial Buildings, Key City Electric Street Railroad, Powerhouse & Storage Barn, Eighth & Washington Streets, Dubuque, Dubuque County, IA

  16. 22. ASSEMBLY OF 9700 H.P. ALLIS CHALMERS TURBINE, CENTERVILLE P.H. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    22. ASSEMBLY OF 9700 H.P. ALLIS CHALMERS TURBINE, CENTERVILLE P.H. Drawing no. 50153, traced from Allis Chalmers drawing #699, April 24, 1906. - Centerville Hydroelectric System, Powerhouse, Butte Creek, Centerville, Butte County, CA

  17. 8. Photocopy of Station Grounding drawing showing floor plans (from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. Photocopy of Station Grounding drawing showing floor plans (from the BPA Engineering Vault, Drawing 005319, 3 May 1939) - Bonneville Power Administration South Bank Substation, I-84, South of Bonneville Dam Powerhouse, Bonneville, Multnomah County, OR

  18. Detail of backup exciter showing direct current generator Mystic ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Detail of backup exciter showing direct current generator - Mystic Lake Hydroelectric Facility, Powerhouse, Along West Rosebud Creek, 1 3/4 miles northeast of Mystic Lake Dam, Fishtail, Stillwater County, MT

  19. Overview of curtain walls at Control Room. Backup exciter in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Overview of curtain walls at Control Room. Backup exciter in foreground. View to west-southwest - Mystic Lake Hydroelectric Facility, Powerhouse, Along West Rosebud Creek, 1 3/4 miles northeast of Mystic Lake Dam, Fishtail, Stillwater County, MT

  20. 76 FR 28219 - Uniontown Hydro, LLC, Newburgh Hydro, LLC; Notice of Applications Tendered for Filing With the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-16

    ...-foot-wide powerhouse and inlet containing four Kaplan turbine-generators, with an installed capacity of... Kaplan turbine-generators, with an installed capacity of 13.0 MW each for a total plant capacity of...

  1. 46. William E. Barrett, Photographer, August 1975. INTERIOR OF EAST ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    46. William E. Barrett, Photographer, August 1975. INTERIOR OF EAST ADDITION TO POWERHOUSE SHOWING GENERATING UNITS (STEAM TURBINE) ADDED. - Meadow River Lumber Company, Highway 60, Rainelle, Greenbrier County, WV

  2. Two-stroke engines; Cleaner and meaner

    SciTech Connect

    Siuru, B.

    1990-06-01

    This article discusses how advanced technologies such as direct fuel injection and stratified charge combustion have turned the two-stroke engine into a clean, gasoline conserving powerhouse. The testing of prototype automotive designs is discussed.

  3. 20. photographer unknown undated EXCAVATION AND ROCK TRIMMING FOR LOCK ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. photographer unknown undated EXCAVATION AND ROCK TRIMMING FOR LOCK AND GATE SILL COMPLETED. - Bonneville Project, Navigation Lock No. 1, Oregon shore of Columbia River near first Powerhouse, Bonneville, Multnomah County, OR

  4. 22. photographer unknown 8 May 1935 EXCAVATION FOR MAIN CULVERT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    22. photographer unknown 8 May 1935 EXCAVATION FOR MAIN CULVERT AND LATERALS IN LOCK FLOOR. - Bonneville Project, Navigation Lock No. 1, Oregon shore of Columbia River near first Powerhouse, Bonneville, Multnomah County, OR

  5. Diabetes Superfoods

    MedlinePlus

    ... get rid of as much sodium as possible. Dark Green Leafy Vegetables Spinach, collards, kale – these powerhouse ... a favorite. The good news is that no matter how you like your tomatoes, pureed, raw, or ...

  6. 16. EXCITERS, AND SYNCHROSCOPE GAUGE ON WALL. ACTIVE ELECTRIC EXCITER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. EXCITERS, AND SYNCHROSCOPE GAUGE ON WALL. ACTIVE ELECTRIC EXCITER AT REAR; UNUSED WATER-DRIVEN EXCITER IN FOREGROUND. VIEW TO SOUTH-SOUTHWEST. - Santa Ana River Hydroelectric System, SAR-2 Powerhouse, Redlands, San Bernardino County, CA

  7. 15. INTERIOR OVERVIEW TO SOUTHEAST. ACTIVE CONTROL PANEL AND GENERATORS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. INTERIOR OVERVIEW TO SOUTHEAST. ACTIVE CONTROL PANEL AND GENERATORS AT LEFT, HISTORIC CONTROL PANEL AT RIGHT. - Santa Ana River Hydroelectric System, SAR-1 Powerhouse, Redlands, San Bernardino County, CA

  8. 31. CRANE RUNWAY FOR 5TON PUSH TYPE CRANE, SANTA ANA ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    31. CRANE RUNWAY FOR 5-TON PUSH TYPE CRANE, SANTA ANA RIVER NO. 3, SEPT. 4, 1945. SCE drawing no. 523856-2. - Santa Ana River Hydroelectric System, SAR-3 Powerhouse, San Bernardino National Forest, Redlands, San Bernardino County, CA

  9. Detail of exciter turbine showing shaft, scroll case, servomotor and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Detail of exciter turbine showing shaft, scroll case, servo-motor and operating ring (left foreground) and hand wheel for butterfly valve (right background) - Morony Hydroelectric Facility, Dam and Powerhouse, Morony Dam Road, Great Falls, Cascade County, MT

  10. 37. SAR2, SHOWING OIL CIRCUIT BREAKERS (ABOVE) AND GENERATOR FIELD ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. SAR-2, SHOWING OIL CIRCUIT BREAKERS (ABOVE) AND GENERATOR FIELD COIL CONTROL RHEOSTATS (BELOW). SCE negative no. 10331, November 1, 1923. Photograph by G. Haven Bishop. - Santa Ana River Hydroelectric System, SAR-2 Powerhouse, Redlands, San Bernardino County, CA

  11. 24. TELEPHONE BOOTH (LEFT), TRANSFORMERS (RIGHT), AND OIL CIRCUIT BREAKERS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    24. TELEPHONE BOOTH (LEFT), TRANSFORMERS (RIGHT), AND OIL CIRCUIT BREAKERS (TOP). SCE negative no. 10341, November 1, 1923. Photograph by G. Haven Bishop. - Santa Ana River Hydroelectric System, SAR-3 Powerhouse, San Bernardino National Forest, Redlands, San Bernardino County, CA

  12. 12. Sewage Ejector Pumps, view to the southwest. These pumps ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. Sewage Ejector Pumps, view to the southwest. These pumps are connected to sewage treatment tanks. - Washington Water Power Clark Fork River Cabinet Gorge Hydroelectric Development, Powerhouse, North Bank of Clark Fork River at Cabinet Gorge, Cabinet, Bonner County, ID

  13. 3. View from left central portion of building looking east ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. View from left central portion of building looking east showing Nordberg Steam Engine and Westinghouse DC generator. - International Smelting & Refining Company, Tooele Smelter, Powerhouse, State Route 178, Tooele, Tooele County, UT

  14. 4. View showing cylinder end of two, cylinder, compound Corliss ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. View showing cylinder end of two, cylinder, compound Corliss steam engine with tandem air compressor. - International Smelting & Refining Company, Tooele Smelter, Powerhouse, State Route 178, Tooele, Tooele County, UT

  15. 30. BEDROOM #3 INTERIOR SHOWING 1 LIGHT OVER 1 LIGHT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    30. BEDROOM #3 INTERIOR SHOWING 1 LIGHT OVER 1 LIGHT WINDOW ON EAST WALL AND PARTIALLY OPENED DOOR TO WINDOWED CLOSET. VIEW TO EAST. - Big Creek Hydroelectric System, Powerhouse 8, Operator Cottage, Big Creek, Big Creek, Fresno County, CA

  16. 17. DINING ROOM INTERIOR SHOWING GROUP OF THREE 1 LIGHT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. DINING ROOM INTERIOR SHOWING GROUP OF THREE 1 LIGHT OVER 1 LIGHT WINDOWS, AND DOORWAY INTO KITCHEN. VIEW TO EAST. - Big Creek Hydroelectric System, Powerhouse 8, Operator Cottage, Big Creek, Big Creek, Fresno County, CA

  17. 42. FOUNDATIONS TAIL RACE, ETC., POWER HOUSE SANTA ANA ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    42. FOUNDATIONS - TAIL RACE, ETC., POWER HOUSE SANTA ANA RIVER NO. 2, EDISON ELECTRIC CO., NOV. 3, 1904. SCE drawing no. 5393. - Santa Ana River Hydroelectric System, SAR-2 Powerhouse, Redlands, San Bernardino County, CA

  18. 77 FR 28873 - Nuvista Light and Electric Cooperative, Inc.; Notice of Preliminary Permit Application Accepted...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-16

    ... substation in the town of Bethel; (9) project access facilities, including a float plane dock and a heliport; (10) project roads leading from the float plane dock to the dam and powerhouse; and (11)...

  19. 6. DETAIL INTAKE NEWHALEM WITH NO WATER FLOWING OVER THE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. DETAIL INTAKE NEWHALEM WITH NO WATER FLOWING OVER THE DAM, 1989. - Skagit Power Development, Newhalem Powerhouse & Dam, On Skagit River, 0.3 mile downstream from Newhalem, Newhalem, Whatcom County, WA

  20. 76 FR 74783 - American River Power II, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-01

    ... operate run-of-river utilizing surplus water from the Olmsted Lock & Dam, as directed by the Corps... consist of the following: (1) A intake channel; (2) a powerhouse containing three generating unit with...

  1. 59. Credit FM. Flood waters on South Battle Creek next ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    59. Credit FM. Flood waters on South Battle Creek next to powerhouse. Note height of water in relation to tailraces. - Battle Creek Hydroelectric System, Battle Creek & Tributaries, Red Bluff, Tehama County, CA

  2. 1. Historic American Buildings Survey Harold Allen, Photographer 31 May ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Historic American Buildings Survey Harold Allen, Photographer 31 May 1964 WEST (NORMAL AVE.) AND SOUTHEAST (CANALPORT AVE.) ELEVATIONS - Schoenhofen Brewing Company, Powerhouse, 1770 Canalport Avenue, Chicago, Cook County, IL

  3. 78 FR 52521 - Public Utility District No. 1 of Snohomish County; Notice of Application Tendered For Filing With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-23

    ... FERCOnlineSupport@ferc.gov , (866) 208-3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic... powerhouse containing a single 6-megawatt two-jet horizontal- shaft Pelton turbine generator; (6) a...

  4. 78 FR 52520 - Public Utility District No. 1 of Snohomish County; Notice of Application Tendered for Filing with...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-23

    ... FERCOnlineSupport@ferc.gov , (866) 208-3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic... powerhouse containing a single 6-megawatt two-jet horizontal- shaft Pelton turbine/generator; (6) a...

  5. 15. VIEW OF THE ORIGINAL 10TON OVERHEAD NILES TRAVELING CRANE. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. VIEW OF THE ORIGINAL 10-TON OVERHEAD NILES TRAVELING CRANE. - Washington Water Power Company Post Falls Power Plant, Middle Channel Powerhouse & Dam, West of intersection of Spokane & Fourth Streets, Post Falls, Kootenai County, ID

  6. 3. OBLIQUE VIEW OF THE PRESENT CONTROL ROOM (ORIGINALLY THE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. OBLIQUE VIEW OF THE PRESENT CONTROL ROOM (ORIGINALLY THE TRANSFORMER ROOM). - Washington Water Power Company Post Falls Power Plant, Middle Channel Powerhouse & Dam, West of intersection of Spokane & Fourth Streets, Post Falls, Kootenai County, ID

  7. 34. ELEVATION OF RELAY AND CONTROL SWITCHBOARD, SANTA ANA RIVER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    34. ELEVATION OF RELAY AND CONTROL SWITCHBOARD, SANTA ANA RIVER P.H. #3, JUNE 23, 1943. SCE drawing no. 413187-1. - Santa Ana River Hydroelectric System, SAR-3 Powerhouse, San Bernardino National Forest, Redlands, San Bernardino County, CA

  8. ERECTING SHOP, EAST SIDE, LOOKING SOUTH. LEFT FOREGROUND BREAK IN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ERECTING SHOP, EAST SIDE, LOOKING SOUTH. LEFT FOREGROUND BREAK IN WALL IS FOR PASSAGE OF STEAM-POWERED BELTING FROM POWERHOUSE. - Southern Pacific, Sacramento Shops, Erecting Shop, 111 I Street, Sacramento, Sacramento County, CA

  9. View of stanchions facing SW. The Grandluxe Express luxury train, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of stanchions facing SW. The Grandluxe Express luxury train, formerly the American Orient Express, sits in foreground. Powerhouse in background. - Grand Canyon Village Utilities, Grand Canyon National Park, Grand Canyon Village, Coconino County, AZ

  10. 36. GABLE END VIEW OF 1907 AND 1913 SECTIONS OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    36. GABLE END VIEW OF 1907 AND 1913 SECTIONS OF POWERHOUSE, SHOWING INTAKE GATE OPENING EQUIPMENT, LOOKING WEST TOWARD LEFT BANK FROM FENCE BY PASTURE ON RIGHT BANK - Swan Falls Dam, Snake River, Kuna, Ada County, ID

  11. 36. SAR1 UNDER CONSTRUCTION, WITH WORKERS ATOP CRANE. EEC print ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    36. SAR-1 UNDER CONSTRUCTION, WITH WORKERS ATOP CRANE. EEC print no. N-C-01-00031, no date. Photograph by Benjamin F. Pearson. - Santa Ana River Hydroelectric System, SAR-1 Powerhouse, Redlands, San Bernardino County, CA

  12. 20. SOUTH ELEVATION, SHOWING ORIGINAL HIGH VOLTAGE GETAWAYS. SCE negative ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. SOUTH ELEVATION, SHOWING ORIGINAL HIGH VOLTAGE GETAWAYS. SCE negative no. 10340, November 1, 1923. Photograph by G. Haven Bishop. - Santa Ana River Hydroelectric System, SAR-3 Powerhouse, San Bernardino National Forest, Redlands, San Bernardino County, CA

  13. 57. ELECTRICAL EQUIPMENT PLOT PLAN, SANTA ANA NO. 1 HYDRO ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    57. ELECTRICAL EQUIPMENT PLOT PLAN, SANTA ANA NO. 1 HYDRO PLANT, OCTOBER 10, 1958. SCE drawing no. 428615-0. - Santa Ana River Hydroelectric System, SAR-1 Powerhouse, Redlands, San Bernardino County, CA

  14. 75 FR 52938 - Energy Exchange, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-30

    ... Water System within the city of Astoria, Clatsop County, Oregon. The sole purpose of a preliminary... in each powerhouse; and (5) a new three-phase transmission line (voltage to be determined) to...

  15. 6. GENERAL VIEW OF TRASH RACKS AND HEADWORKS; METALSIDED BUILDING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. GENERAL VIEW OF TRASH RACKS AND HEADWORKS; METAL-SIDED BUILDING WITH GABLE ROOF IS THE ELEVATOR SHAFT TO THE CAVITY POWERHOUSE - Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

  16. 26. photographer unknown 29 December 1937 FLOATING MOORING BIT INSTALLED ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    26. photographer unknown 29 December 1937 FLOATING MOORING BIT INSTALLED IN LOCK SIDEWALL. - Bonneville Project, Navigation Lock No. 1, Oregon shore of Columbia River near first Powerhouse, Bonneville, Multnomah County, OR

  17. 76 FR 71963 - KC Hydro LLC of New Hampshire; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-21

    ... 340-foot- long, 34-foot-high, concrete gravity Weare Reservoir Dam equipped with a 157-foot-long ogee....49 feet National Geodetic Vertical Datum; (4) a new powerhouse containing two submersible or...

  18. 5. INTERIOR VIEW OF POWER HOUSE, LOOKING SOUTH, SHOWING 1500 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. INTERIOR VIEW OF POWER HOUSE, LOOKING SOUTH, SHOWING 1500 HP TURBINE AND GENERATOR IN FOREGROUND, FRANCIS TURBINE AND GENERATOR AT REAR - Centerville Hydroelectric System, Powerhouse, Butte Creek, Centerville, Butte County, CA

  19. 12. DETAIL VIEW OF GENERATOR BAY, GENERATOR ROOM, SHOWING TURBINEGENERATOR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. DETAIL VIEW OF GENERATOR BAY, GENERATOR ROOM, SHOWING TURBINE-GENERATOR DRIVE SHAFT IN FOREGROUND, ACCESS BULKHEAD TO TURBINE IN BACKGROUND - Nine Mile Hydroelectric Development, Powerhouse, State Highway 291 along Spokane River, Nine Mile Falls, Spokane County, WA

  20. 2. VIEW OF GOVERNANCE EQUIPMENT AT UNIT 3 GENERATOR (RIGHT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. VIEW OF GOVERNANCE EQUIPMENT AT UNIT 3 GENERATOR (RIGHT BACKGROUND) SHOWING PRESSURE TANK (LEFT BACKGROUND), GOVERNOR STAND (CENTER), AND SUMP PUMP (RIGHT FOREGROUND). VIEW TO SOUTHEAST. - Black Eagle Hydroelectric Facility, Powerhouse, Great Falls, Cascade County, MT

  1. 53. NEW BCB AND LIGHTNING ARRESTER ARRANGEMENT, SANTA ANA RIVER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    53. NEW BCB AND LIGHTNING ARRESTER ARRANGEMENT, SANTA ANA RIVER NO. 2, JAN. 24, 1977. SCE drawing no. 455670-0. - Santa Ana River Hydroelectric System, SAR-2 Powerhouse, Redlands, San Bernardino County, CA

  2. 33. photographer unknown 15 October 1936 PANORAMA OF BONNEVILLE PROJECT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    33. photographer unknown 15 October 1936 PANORAMA OF BONNEVILLE PROJECT WITH LOCK AND ORIGINAL POWERHOUSE NEARLY COMPLETE AND SPILLWAY UNDER CONSTRUCTION. - Bonneville Project, Columbia River, 1 mile Northeast of Exit 40, off Interstate 84, Bonneville, Multnomah County, OR

  3. 23. A typical 107 Retention Basin, in this case in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    23. A typical 107 Retention Basin, in this case in the 100-F Area in February 1945. The Columbia River is in the background and the 184 Powerhouse is at the left. P-8458 - B Reactor, Richland, Benton County, WA

  4. 14. DETAILS OF GATE OPERATING MECHANISM, SHOWING RACK SECTION, CUT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. DETAILS OF GATE OPERATING MECHANISM, SHOWING RACK SECTION, CUT TEETH, CAST TEETH, GATE PINION (1907) - Nine Mile Hydroelectric Development, Powerhouse, State Highway 291 along Spokane River, Nine Mile Falls, Spokane County, WA

  5. 81. photographer unknown 11 June 1937 WORKMEN ON TURBINE BLADES ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    81. photographer unknown 11 June 1937 WORKMEN ON TURBINE BLADES BEFORE LOWERING INTO DRAFT TUBE LINER. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  6. 7. NORTH EXTERIOR SIDE SHOWING TRIANGULAR KNEE BRACE SUPPORTS AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. NORTH EXTERIOR SIDE SHOWING TRIANGULAR KNEE BRACE SUPPORTS AND ENCLOSED PORCH SCREENED WINDOWS. VIEW TO SOUTH. - Big Creek Hydroelectric System, Powerhouse 8, Operator Cottage, Big Creek, Big Creek, Fresno County, CA

  7. 20. GENERATOR #1 NEEDLE VALVE CONTROL WHEEL, WATERWHEEL GOVERNOR, PENSTOCK ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. GENERATOR #1 NEEDLE VALVE CONTROL WHEEL, WATERWHEEL GOVERNOR, PENSTOCK PRESSURE GAUGE, AND GOVERNOR OIL SET. VIEW TO EAST. - Santa Ana River Hydroelectric System, SAR-2 Powerhouse, Redlands, San Bernardino County, CA

  8. 60. NEEDLE AND NOZZLE TIP, SANTA ANA NO. 1, SOUTHERN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    60. NEEDLE AND NOZZLE TIP, SANTA ANA NO. 1, SOUTHERN CALIFORNIA EDISON CO., APR. 28, 1910, REVISED MAY 12, 1910. SCE drawing no. 4500. - Santa Ana River Hydroelectric System, SAR-1 Powerhouse, Redlands, San Bernardino County, CA

  9. 48. AUTOMATIC WATER CONTROL MOTOR DRIVE FOR NEEDLES CONSTRUCTION DETAILS, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    48. AUTOMATIC WATER CONTROL MOTOR DRIVE FOR NEEDLES CONSTRUCTION DETAILS, SANTA ANA RIVER NO. 2, JAN. 24, 1977. SCE drawing no. 455667-0. - Santa Ana River Hydroelectric System, SAR-2 Powerhouse, Redlands, San Bernardino County, CA

  10. 78 FR 54884 - Antrim County; Notice of Intent To Prepare an Environmental Assessment and Notice of Scoping...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-06

    ... with sliding head gates at the powerhouse wall; (7) two Francis turbines, each with an installed... project operates in a run-of-river mode and the water surface elevation is maintained at 590.8 feet...

  11. View of rear of Childs Powerhosue. Rockwork on east end ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of rear of Childs Powerhosue. Rockwork on east end was recently replaced following a flood. Looking south-southwest - Childs-Irving Hydroelectric Project, Childs System, Childs Powerhouse, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ

  12. View of the current distribution "bus" atop switching cabinets within ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of the current distribution "bus" atop switching cabinets within the former transformer building. Looking northwest - Childs-Irving Hydroelectric Project, Childs System, Childs Powerhouse, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ

  13. View of Diversion Dam and Flume Intake of the Childs ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of Diversion Dam and Flume Intake of the Childs System at the Irving Powerhouse. Looking northwest - Childs-Irving Hydroelectric Project, Childs System, Flume Intake & Forebay, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ

  14. 19. Oil Storage Tanks, view to the northwest. Washington ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. Oil Storage Tanks, view to the northwest. - Washington Water Power Clark Fork River Cabinet Gorge Hydroelectric Development, Powerhouse, North Bank of Clark Fork River at Cabinet Gorge, Cabinet, Bonner County, ID

  15. 8. GENERAL VIEW LOOKING NORTHEAST AT LANDSCAPING; THE AUDITORIUM IS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. GENERAL VIEW LOOKING NORTHEAST AT LANDSCAPING; THE AUDITORIUM IS BEHIND THE TREE ON FAR LEFT; POWERHOUSE #1 IS OUT OF VIEW IN THE RIGHT BACKGROUND. Photograph Nos. OR-11-9 through OR-11-37 are photocopies of photographs. Original aerial and historic photographs are located at the Bonneville Powerhouse, Bonneville, Oregon. - Bonneville Project, Columbia River, 1 mile Northeast of Exit 40, off Interstate 84, Bonneville, Multnomah County, OR

  16. Lock and Dam Number 8 hydropower study; Mississippi River near Lacrosse, Wisconsin. supplement. Technical report Technical report

    SciTech Connect

    Not Available

    1985-01-01

    The purpose of this study is to determine the feasibility of constructing hydropower facilities at Lock and Dam no. 8, located on the Mississippi River, near La Crosse, Wisconsin. Several alternative powerhouse schemes were investigated. The 8.75 megawatt, 10-unit plant indicated in the 1981 reconnaissance is now considered economically infeasible. Two alternate developments using tubular generating units were selected for this new study. Because of relatively low overhead, the powerhouse costs are proportionally high and project feasibility falls below unity.

  17. 103. Photocopy of original construction drawing, dated 12 December 1933 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    103. Photocopy of original construction drawing, dated 12 December 1933 (Original print in the possession of U.S. Army Corps of Engineers, Portland District, Portland District, Portland, OR.) (T-1-2) UNITED STATES BUREAU OF FISHERIES PROPOSED MULTIPLE COLLECTING FISHWAYS AND HYDRAULIC FISH LIFT AT THE BONNEVILLE POWERHOUSE. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  18. Swan Falls: Bringing new lift to an old site

    SciTech Connect

    Groff, E.O. )

    1994-02-01

    Idaho Power Company is adding a new hydroelectric project to its system in the spring of 1994. The utility anticipates that the new development will extend the life of an existing hydro site for another century. This article describes the development of the new hydroelectric project at the existing Swan Falls plant south of Boise. The design of the new powerhouse and the decommissioning of the old powerhouse are described.

  19. The Distribution and Flux of Fish in the Forebay of The Dalles Dam in 2003

    SciTech Connect

    Faber, Derrek M.; Hanks, Michael E.; Zimmerman, Shon A.; Skalski, John R.; Dillingham, Peter W.

    2005-04-29

    In spring and summer 2003, the Pacific Northwest National Laboratory led a team that conducted mobile and fixed hydroacoustic surveys in the forebay of The Dalles Dam for the U.S. Army Corps of Engineers - Portland District, for the Anadromous Fish Evaluation Program. The surveys provided information on the distribution and movement of smolt-sized fish relative to ambient factors such as flow, bathymetry, or diel cycle in the forebay at The Dalles Dam. This information is intended to provide baseline data for the development of a surface bypass alternative for juvenile salmon at The Dalles Dam. We sampled the forebay of The Dallas Dam one day and night each week for six weeks in the spring and another six weeks in the summer. In general, during the day in the spring, the greatest densities of smolt-sized fish were observed in the thalweg of the main channel from the Washington bank, to the east side of the powerhouse, along the powerhouse, and concentrated in the areas next to the sluiceway. Fish density was lower on the Washington side of the river and west of mid-powerhouse (north spillway side). The spring night distribution was similar, with a few notable differences. The density of fish was high on the east side of the powerhouse and along the face of the powerhouse, and more fish were detected on the north spillway side. The distribution of sub-yearling sized fish in summer followed the same general patterns as spring, except that summer fish had a greater presence on the east side of the powerhouse and on the north spillway side. The vertical distribution of fish was also determined. In spring 80% of fish were above 5.6 m of depth during the day and above 4.7 m in the night. The summer fish were similarly distributed in the day and night with 80% of the fish in the upper 4.5 m and 4.7 m of the water column respectively. In general the smolt-sized fish were distributed deeper in the water column in the center of the channel than near the edges. The net

  20. 9 CFR 317.2 - Labels: definition; required features.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... has been removed. Spices include the spices listed in 21 CFR 182.10, and 184. (B) The term “natural... plants listed in 21 CFR 182.10, 182.20, 182.40, 182.50 and 184, and the substances listed in 21 CFR 172... whole or in part and shall be in conformity with regulations (21 CFR part 125) established pursuant...

  1. Small-Scale Hydroelectric Power Demonstration Project: reactivation of the Elk Rapids Hydroelectric Facility. Final technical and construction cost report

    SciTech Connect

    Not Available

    1985-05-01

    The Elk Rapids powerhouse dam is located on the Elk River channel in the Village of Elk Rapids, Michigan. Together with a small spillway structure located approximately 500 ft south of the dam, it constitutes the outlet to Lake Michigan for Elk Lake, Skegemog Lake, Torch Lake, Lake Bellaire, Clam Lake, and several smaller lakes. Power has been generated at the Elk Rapids site since the late nineteenth century, but the history of the present facility goes back to 1916 with the construction of the existing powerhouse dam by the Elk Rapids Iron Works Company. The facility was designed to contain four vertical-shaft generating units; however, only a single 270 hp Leffel type K unit was installed in 1916. In 1929, two additional Leffel units, rated 525 hp, were installed, and in 1930 a third 525 hp Leffel unit was added completely utilizing the capacity of the powerhouse and bringing the combined turbine capacity to 1845 hp.

  2. 39. REBUILT ENGINES AND WINDING MACHINERY: Photocopy of December 1906 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    39. REBUILT ENGINES AND WINDING MACHINERY: Photocopy of December 1906 photograph of the steam engines and winding machinery at the Washington and Mason Street powerhouse. View towards west. United Railroads of San Francisco rebuilt the damaged engines and winders shown in CA-12-60 and CA-12-61. There are no cables strung over the winders in this photograph, indicating that the firm had yet to resume service. Note the rough shed erected over the engines to protect them from weather while work continued on the reconstruction of the powerhouse. - San Francisco Cable Railway, Washington & Mason Streets, San Francisco, San Francisco County, CA

  3. 26. BUILDING PLANS FOR MENTONE POWER HOUSE, PACIFIC LIGHT AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    26. BUILDING PLANS FOR MENTONE POWER HOUSE, PACIFIC LIGHT AND POWER CO., OCT. 7, 1903. R.S. MASSON, CONSULTING ELECTRICAL ENGINEER, SAN FRANCISCO AND LOS ANGELES. SCE drawing no. 52306. - Santa Ana River Hydroelectric System, SAR-3 Powerhouse, San Bernardino National Forest, Redlands, San Bernardino County, CA

  4. 19. PLAN AND SECTION DRAWINGS OF ELECTRICAL SWITCH GEAR, BUSES ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. PLAN AND SECTION DRAWINGS OF ELECTRICAL SWITCH GEAR, BUSES AND OTHER EQUIPMENT, AS INSTALLED IN POWERHOUSE Switchboard and Low Tension Bus Structure, drawing E1703. Drawn by L. M. Brown for the Washington Water Power Company, March 15, 1924. - Enloe Dam, Power House, On Similkameen River, Oroville, Okanogan County, WA

  5. 29. ELECTRICAL EQUIPMENT. PLAN FOR POWER HOUSE, SANTA ANA RIVER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    29. ELECTRICAL EQUIPMENT. PLAN FOR POWER HOUSE, SANTA ANA RIVER P. H. NO. 3, JUNE 23, 1943; REVISIONS, MAR. 14, 1945 AND MAY 17, 1954. SCE drawing no. 523219-2. - Santa Ana River Hydroelectric System, SAR-3 Powerhouse, San Bernardino National Forest, Redlands, San Bernardino County, CA

  6. 6. Fire Protection (high pressure), view to the east. Located ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. Fire Protection (high pressure), view to the east. Located on the pipe floor between Unit 3 and Unit 4, the high pressure CO2 tanks are connected to the generator barrel of all four units. - Washington Water Power Clark Fork River Cabinet Gorge Hydroelectric Development, Powerhouse, North Bank of Clark Fork River at Cabinet Gorge, Cabinet, Bonner County, ID

  7. 44. VIEW SHOWING SUMP PUMP ROOM IN 1907 SECTION OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    44. VIEW SHOWING SUMP PUMP ROOM IN 1907 SECTION OF POWERHOUSE, LOOKING STRAIGHT DOWN INTO VALVES AND PIPES. CAMERA ORIENTATION IS FROM RIGHT BANK, FACING TOWARDS LEFT BANK, AND PERPENDICULAR TO RIVER FLOW. - Swan Falls Dam, Snake River, Kuna, Ada County, ID

  8. View of steel flume (Irving intake system) that is covered ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of steel flume (Irving intake system) that is covered with old flume stock, flattened to protect from debris, animals and daylight, and is supported by wood trestles, as it continues downhill toward the Irving Powerhouse. Truck in photo provides scale. Looking north - Childs-Irving Hydroelectric Project, Irving System, Intake System, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ

  9. 124. Photocopy of original construction drawing, dated 12 October 1935 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    124. Photocopy of original construction drawing, dated 12 October 1935 (Original print in the possession of U.S. Army Corps of Engineers, Portland District, Portland, OR.) (T-3-83, Sheet 1 of 6) COLLECTION CHANNEL DETAILS: WOOD GRATING AND BAFFLES IN DIFFUSION CHAMBERS. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  10. 77 FR 59394 - Wills Creek Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-27

    ... located at the west abutment; and (4) a 230-foot-long, 25-foot-wide, 25-foot-high concrete arch tunnel...' concrete arch tunnel; (2) a 30-foot- long, 106-inch-diameter steel penstock; (3) a 30-foot-wide, 25-foot- long, 20-foot-high powerhouse located near the west wing wall of the Corps' existing outlet channel...

  11. Detail Hframe structure about five and onefourth miles southwest of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Detail H-frame structure about five and one-fourth miles southwest of Morony Dam and Powerhouse showing one modern non-ceramic insulator and two historic porcelain suspension insulators - Morony Hydroelectric Facility, Morony-to-Rainbow 100 kV Transmission Line, West bank of the Missouri River, Great Falls, Cascade County, MT

  12. 38. ELEPHANT BOILERS 1905: Photocopy of April 1905 photograph ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    38. ELEPHANT BOILERS - 1905: Photocopy of April 1905 photograph showing elephant boilers along the west wall of the Washington and Mason Street powerhouse and car barn. View looking west on first floor of building. - San Francisco Cable Railway, Washington & Mason Streets, San Francisco, San Francisco County, CA

  13. Connective tissue diseases: Mitochondria drive NETosis and inflammation in SLE.

    PubMed

    Boilard, Eric; Fortin, Paul R

    2016-04-01

    Mitochondria are the powerhouses of the cell, providing energy through oxidative respiration. Possibly owing to their similarities with bacteria, however, mitochondria extruded from cells promote inflammation. New research demonstrates that in systemic lupus erythematosus, mitochondrial respiration is critical in neutrophil extracellular trap formation, and that mitochondria released by neutrophils induce inflammatory cytokine production. PMID:26935279

  14. 75 FR 57758 - Antrim Treatment Trust; Notice of Declaration of Intention and Soliciting Comments, Protests, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-22

    ... to a water treatment plant through a 12-inch PVC pipe; (2) an 1,100-foot-long, 18-inch-diameter HDPA pipe penstock from the treatment plant; (3) a powerhouse, located on the penstock, containing a Turgo... Energy Regulatory Commission Antrim Treatment Trust; Notice of Declaration of Intention and...

  15. 75 FR 37788 - Antrim Treatment Trust; Notice of Declaration of Intention and Soliciting Comments, Protests, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-30

    ... treatment plant through a 12-inch PVC pipe; (2) an 1,100-foot-long, 18-inch-diameter HDPA pipe penstock from the treatment plant; (3) a powerhouse, located on the penstock, containing a Turgo turbine with a... approximately 1,100-feet to the treatment plant, where it will be connected to the interstate grid; and...

  16. 77 FR 73650 - Peabody Trout Creek Reservoir LLC;

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-11

    ... treatment plant, pump station, and powerhouse containing a 125-kilowatt turbine-generator; (6) a 200-foot... high water elevation of 6,669 feet above mean sea level forming a 392-acre reservoir and impounding 11,720 acre-feet of water; (2) a primary spillway consisting of a 54-inch-diameter ductile...

  17. 77 FR 8246 - Alabama Power Company; Notice of Application Accepted for Filing, Soliciting Motions To Intervene...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-14

    ... 35291, telephone (205) 257-8180; James F. Crew, Manager, Hydro Services, Alabama Power Company, 600... elevation of 491 feet mean sea level (msl); (3) headworks containing four steel penstocks and 12 intake... concrete, steel-frame powerhouse; (5) four vertical Francis turbines that power four generating units...

  18. Inseparable Imperatives: Equity in Education and the Future of the American Economy

    ERIC Educational Resources Information Center

    DeBaun, Bill

    2012-01-01

    For most of the last sixty years, the United States has labored to provide a quality education to "all" children, regardless of their skin color or socioeconomic status. This struggle for equity in education has seldom been linked to America's position as the world's economic powerhouse and leading producer of college-educated individuals.…

  19. 21. Greasing System for Unit 1, view to the northeast. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    21. Greasing System for Unit 1, view to the northeast. This unit provides lubricating grease for all of the pins and bushings in the turbine pit through the grease lines visible in photograph MT-105-A-12 above. - Washington Water Power Clark Fork River Noxon Rapids Hydroelectric Development, Powerhouse, South bank of Clark Fork River at Noxon Rapids, Noxon, Sanders County, MT

  20. 13. Governor Housing of Unit 5, view to the west. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. Governor Housing of Unit 5, view to the west. Note the analog displays that are soon to be replaced with digital displays. - Washington Water Power Clark Fork River Noxon Rapids Hydroelectric Development, Powerhouse, South bank of Clark Fork River at Noxon Rapids, Noxon, Sanders County, MT

  1. 8. Generator Barrel and Shaft of Unit 1, view to ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. Generator Barrel and Shaft of Unit 1, view to the northwest, with turbine shaft and thrust bearing visible in upper center of photograph. - Washington Water Power Clark Fork River Noxon Rapids Hydroelectric Development, Powerhouse, South bank of Clark Fork River at Noxon Rapids, Noxon, Sanders County, MT

  2. 1. Operating Floor Front (east) Corridor, view to the north. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Operating Floor Front (east) Corridor, view to the north. The wall of turbine Unit 1 is visible in left foreground of photograph. - Washington Water Power Clark Fork River Noxon Rapids Hydroelectric Development, Powerhouse, South bank of Clark Fork River at Noxon Rapids, Noxon, Sanders County, MT

  3. 1. Slacking Tower north side, view to the southsouthwest. The ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Slacking Tower north side, view to the south-southwest. The tower was used for dredging the river downstream of the powerhouse. - Washington Water Power Clark Fork River Noxon Rapids Hydroelectric Development, Slacking Tower, South bank of Clark Fork River at Noxon Rapids, Noxon, Sanders County, MT

  4. 7. Unit 3 Service Water System Valves, view to the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Unit 3 Service Water System Valves, view to the east. These pipes and valves supply water from the draft chest for cooling the generator barrels. - Washington Water Power Clark Fork River Cabinet Gorge Hydroelectric Development, Powerhouse, North Bank of Clark Fork River at Cabinet Gorge, Cabinet, Bonner County, ID

  5. 78 FR 57377 - KC Pittsfield LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-18

    ... consumptive water demands. This proposed development would have an average annual generation of 0.03 gigawatt... of one megawatt or installing a new, smaller turbine. The Alta Powerhouse receives water from the Alta forebay via the Towle canal, which diverts water from Canyon Creek. Water discharged from the...

  6. 77 FR 52019 - Kaweah River Power Authority; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-28

    .... The proposed Unit 2 would include: (1) A 6- MW Francis turbine; (2) a 470-foot-long, 6-foot-diameter...-foot-tall concrete powerhouse. The proposed Unit 3 would include: (1) A 2-MW Francis turbine; and (2) a... Unit 4 would include a 1-MW Francis turbine and would be connected by an extension to the proposed...

  7. 75 FR 66080 - KC Hydro LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-27

    ..., connected to a 96-inch-diameter, 45-foot-long steel penstock; (4) a powerhouse containing a 750-kW Francis turbine/generator; (5) a tailrace leading from a rock chamber located under the turbine to the River;...

  8. What Doth It Profit? The Study of Mountain Religion.

    ERIC Educational Resources Information Center

    Salstrom, Paul; And Others

    1990-01-01

    Five papers examine mountain religion, focusing on Jeff Todd Titon's book, "Powerhouse of God: Speech, Chant, and Song in an Appalachian Baptist Church." Discussants include Paul Salstrom; Deborah Vansau McCauley; Howard Dorgan; Altina Waller; and Charles T. Davis. Titon responds, explaining his views and study of religion. (TES)

  9. 14. LOW OBLIQUE VIEW OF WEST ELEVATION, FROM OPPOSITE BANK ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. LOW OBLIQUE VIEW OF WEST ELEVATION, FROM OPPOSITE BANK OF BUTTE CREEK Historic photograph no. 136, no date, held at Media Arts and Services Department, Pacific Gas & Electric Co., San Francisco, CA. - Centerville Hydroelectric System, Powerhouse, Butte Creek, Centerville, Butte County, CA

  10. 19. OVERVIEW OF INTERIOR, LOOKING SOUTH. UNIT #2 IS AT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. OVERVIEW OF INTERIOR, LOOKING SOUTH. UNIT #2 IS AT RIGHT FOREGROUND Historic photograph no. H-145, no date, held at Media Arts and Services Department, Pacific Gas & Electric Co., San Francisco, CA. - Centerville Hydroelectric System, Powerhouse, Butte Creek, Centerville, Butte County, CA

  11. 76 FR 73614 - Lock Hydro Friends Fund XII; BOST2 LLC; Riverbank Hydro No. 21 LLC; FFP Project 96 LLC; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-29

    ...-long, 34.5 kilo-volt (kV) transmission line to an existing power line. The proposed project would have... would consist of: (1) A 250-foot- long, 100-foot-wide headrace channel; (2) a ] powerhouse containing two generating units with a total capacity of 18.0 MW; (3) a 275-foot-long, 100-foot-wide tailrace;...

  12. 77 FR 29626 - Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-18

    ... to: Federal Power Act 16 U.S.C. 791(a)-825(r). h. Applicant Contact: Mr. Douglas A. Spalding, BOST3...-foot-long headrace channel to convey water from the upstream Pool No. 3 of the Red River to a 301-foot-long by 90- foot-wide concrete powerhouse located southwest of the end of the existing spillway, on...

  13. 77 FR 10502 - Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-22

    ... Franklin D. Roosevelt Lake (Roosevelt Lake), near the town of Grand Coulee, Douglas and Grant Counties... racks; (2) a 1.5-mile-long penstock consisting of a vertical shaft, power tunnel segments, and a...; (4) a 2-mile-long, 500-kilovolt (kV) transmission line extending from the project powerhouse to...

  14. 77 FR 29622 - Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-18

    ... to: Federal Power Act 16 U.S.C. 791(a)-825(r). h. Applicant Contact: Mr. Douglas A. Spalding, BOST5... 416-foot-long headrace channel to convey water from the upstream Pool No. 5 of the Red River to a 301-foot-long by 90-foot-wide concrete powerhouse located northeast of the end of the existing...

  15. 77 FR 29623 - Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-18

    ... Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r). h. Applicant Contact: Mr. Douglas A. Spalding... consist of: (1) An excavated 385-foot-long headrace channel to convey water from the upstream Pool No. 4 of the Red River to a 301-foot-long by 90-foot-wide concrete powerhouse located southwest of the...

  16. 4. VIEW UPSTREAM ALONG NORTH FORK OF MIDDLE FORK OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. VIEW UPSTREAM ALONG NORTH FORK OF MIDDLE FORK OF TULE RIVER, LOOKING TOWARD DOWNSTREAM SIDE OF BRIDGE AND POWERHOUSE; FLUME AT LEFT. LOOKING EAST. 90mm lens - Tule River Hydroelectric Complex, Tule River Bridge, Spanning North Fork of Middle Fork of Tule River, Springville, Tulare County, CA

  17. 10. INTERIOR OF SOUTH SIDE ENCLOSED SCREEN PORCH SHOWING 1/2 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. INTERIOR OF SOUTH SIDE ENCLOSED SCREEN PORCH SHOWING 1/2 SCREEN DOOR TO EXTERIOR AND DOUBLE FRENCH DOORS TO DINING ROOM. HOLE AT BOTTOM LEFT OF 1/2 SCREEN DOOR WAS A CAT DOOR. VIEW TO EAST. - Big Creek Hydroelectric System, Powerhouse 8, Operator Cottage, Big Creek, Big Creek, Fresno County, CA

  18. CHCHD2 connects mitochondrial metabolism to apoptosis.

    PubMed

    Liu, Yong; Zhang, Yanping

    2015-01-01

    As the powerhouse of cells and gatekeeper for apoptosis, mitochondria control life and death. CHCHD2, a mitochondrial protein previously known to regulate metabolism, has recently been identified as an apoptosis inhibitor. New data suggest a model in which CHCHD2 performs a prosurvival function by acting as both a reactive oxygen species scavenger and BCL-XL activator. PMID:27308501

  19. 15. ELECTRICAL REACTOR SHELVES, CONSTRUCTED OF CONCRETE IN THE BASEMENT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. ELECTRICAL REACTOR SHELVES, CONSTRUCTED OF CONCRETE IN THE BASEMENT ALONG EAST WALL, WITH REACTOR PADS BEHIND FRAMED AND SCREENED CAGE, AND PORCELAIN-LINED CABLE DUCTS VISIBLE IN WALL NEAR FLOOR AT REAR - Bonneville Power Administration South Bank Substation, I-84, South of Bonneville Dam Powerhouse, Bonneville, Multnomah County, OR

  20. Dollar$ and Sense

    ERIC Educational Resources Information Center

    Stuart, Reginald

    2012-01-01

    When fans of intercollegiate basketball see the month of March approach, they know it's time for the near-marathon round of March Madness when the best of the nation's college basketball teams square off in a battle to the finish for the NCAA Division I championship. It's the month when basketball powerhouses seek to reaffirm their status and…

  1. 1. Credit TCL. South elevation. Note water discharging from all ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Credit TCL. South elevation. Note water discharging from all five tailraces. The portion of the powerhouse erected in 1900-01 is on the right. The 1906 and 1908 additions are on the left. - Battle Creek Hydroelectric System, Battle Creek & Tributaries, Red Bluff, Tehama County, CA

  2. 52. NORTHEASTERN EXTERIOR VIEW OF DOOROLIVER WAST WATER TREATMENT THICKENER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    52. NORTHEASTERN EXTERIOR VIEW OF DOOR-OLIVER WAST WATER TREATMENT THICKENER No. 1. ELECTRIC POWERHOUSE No. 2 AND BLOW ENGINE HOUSE No. 3 IS IN THE BACKGROUND. (Jet Lowe) - U.S. Steel Duquesne Works, Blast Furnace Plant, Along Monongahela River, Duquesne, Allegheny County, PA

  3. Increasing Learning and Reducing Costs through Technology: The University of Alabama Story

    ERIC Educational Resources Information Center

    Witkowsky, Kathy

    2008-01-01

    Long known as a college-football powerhouse, the University of Alabama (UA) is now considered a model for institutions seeking to maintain or boost their academic quality even as enrollments increase and budgets are squeezed. According to Carol Twigg, president of the National Center for Academic Transformation (NCAT), which has been a significant…

  4. 7 CFR 1726.125 - Generating plant facilities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... installations. Engineering services, turbine/generator, civil works and powerhouse construction, electrical... engineering services are not covered by this part, they are listed in this paragraph (d) to emphasize that RUS approval is required for all major generating station engineering service contracts in accordance...

  5. 7. Air Blast Circuit Breaker Compressors, view to the southeast. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Air Blast Circuit Breaker Compressors, view to the southeast. The air blast circuit breakers are visible in the left background of the photograph. - Washington Water Power Clark Fork River Noxon Rapids Hydroelectric Development, Powerhouse, South bank of Clark Fork River at Noxon Rapids, Noxon, Sanders County, MT

  6. Toward a European Model of Higher Education: Processes, Problems, and Promises

    ERIC Educational Resources Information Center

    Kirkwood-Tucker, Toni Fuss

    2004-01-01

    An education revolution is sweeping across the European Community. Like a chilling wind from the east, Europeans have been rudely awakened to the reality that reforming its system of higher education is of great urgency if its goal of becoming a competitive regional powerhouse is to be realized. As public opinion and a growing awareness of the…

  7. 1. GORGE HIGH DAM. THIS THIN ARCH DAM WITH A ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. GORGE HIGH DAM. THIS THIN ARCH DAM WITH A GRAVITY SECTION IS THE THIRD DAM BUILT BY SEATTLE CITY LIGHT TO PROVIDE WATER FOR GORGE POWERHOUSE AND WAS COMPLETED IN 1961, 1989. - Skagit Power Development, Gorge High Dam, On Skagit River, 2.9 miles upstream from Newhalem, Newhalem, Whatcom County, WA

  8. 121. Photocopy of original construction drawing, dated 26 August 1935 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    121. Photocopy of original construction drawing, dated 26 August 1935 (Original print in the possession of U.S. Army Corps of Engineers, Portland District, Portland, OR.) (P-10-19) WINDOWS AND LOUVRES, LAYOUT AND DETAILS. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  9. VIEW OF HIGHTENSION ROOM ON THE TOP FLOOR OF ELWHA ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW OF HIGH-TENSION ROOM ON THE TOP FLOOR OF ELWHA POWERHOUSE LOOKING NORTH AT OVER-HEAD 69 KV BUSSING WITH METERING TRANSFORMERS. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Elwha Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA

  10. Korea targets leadership role in physics

    NASA Astrophysics Data System (ADS)

    Durrani, Matin

    2013-11-01

    The Republic of Korea has transformed itself over the last 50 years from a nation based primarily on agriculture to a hi-tech industrial powerhouse. But now the country is seeing the importance of investing in fundamental science too, as Matin Durrani reports.

  11. 77 FR 27769 - Greybull Valley Irrigation District; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-11

    ... feet of net head; (3) a tailrace channel discharging from the powerhouse to Sunshine Creek; (4) a 3... http://www.ferc.gov/docs-filing/efiling.asp . Commenters can submit brief comments up to 6,000....asp . You must include your name and contact information at the end of your comments. For...

  12. 77 FR 28872 - Willwood Irrigation District; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-16

    ...- diameter penstock; (3) a powerhouse containing one turbine rated for 780 kilowatts at 43.08 feet of net... http://www.ferc.gov/docs-filing/efiling.asp . Commenters can submit brief comments up to 6,000....asp . You must include your name and contact information at the end of your comments. For...

  13. 76 FR 9340 - Mill Town Power Project; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-17

    ... 480-volt, 800-foot-long transmission line connecting the powerhouse with a net metering station; and... http://www.ferc.gov/docs-filing/efiling.asp . Commenters can submit brief comments up to 6,000....asp . You must include your name and contact information at the end of your comments. For...

  14. 77 FR 17475 - Southern Energy, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-26

    ... aboveground; (5) a powerhouse containing one generating unit rated for one megawatt at 780 feet of net head.../efiling.asp . Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp . You must include your...

  15. 77 FR 2286 - Northern Illinois Hydropower, LLC; Notice of Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-17

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Northern Illinois Hydropower, LLC; Notice of Meeting a. Date and Time of... Hydropower, LLC to discuss potentially moving the powerhouse location for the Brandon Road Project No....

  16. Context view of RyantoRainbow 100kv Transmission Line showing copper wire ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Context view of Ryan-to-Rainbow 100kv Transmission Line showing copper wire conductors leaving roof of Ryan Powerhouse. View to east - Ryan Hydroelectric Facility, Ryan-to-Rainbow 100 kV Transmission Line, West bank of Missouri River, northeast of Great Falls, Great Falls, Cascade County, MT

  17. Making Cities Skilled. Civic Bulletin No. 40

    ERIC Educational Resources Information Center

    Glaeser, Edward L.

    2006-01-01

    Throughout history, cities that have been centers of great learning have usually also taken their place as economic powerhouses. Here in America, economists have long noticed that educated cities--that is, cities with a greater percentage of knowledgeable and skilled residents--have fared better economically than their unskilled counterparts, but…

  18. 76 FR 12102 - Pacific Gas and Electric Company; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-04

    ... Gas and Electric Company; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions to Intervene, and Competing Applications On January 31, 2011, Pacific Gas and Electric.... The proposed project would consist of the following: (1) A new single-unit powerhouse with a...

  19. Overview of MoronytoRainbow Line (background) in context with RyantoRainbow 100kV ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Overview of Morony-to-Rainbow Line (background) in context with Ryan-to-Rainbow 100kV Transmission Lines 1 and 2 (center and foreground) about three miles southwest of Morony Dam and Powerhouse. View to north - Morony Hydroelectric Facility, Morony-to-Rainbow 100 kV Transmission Line, West bank of the Missouri River, Great Falls, Cascade County, MT

  20. Overview of MoronytoRainbow Line (far left) in context with RyantoRainbow ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Overview of Morony-to-Rainbow Line (far left) in context with Ryan-to-Rainbow Lines 1 and 2 (center) about six miles southwest of Morony Dam and Powerhouse. View to east-northeast - Morony Hydroelectric Facility, Morony-to-Rainbow 100 kV Transmission Line, West bank of the Missouri River, Great Falls, Cascade County, MT

  1. A Branch Meeting in Avon

    ERIC Educational Resources Information Center

    Vaughan, Kathryn; Coles, Alf

    2011-01-01

    The Association of Teachers of Mathematics (ATM) exists for, and is run by, its members. Branch meetings are so much more than the "grass roots" of the association--it can be a powerhouse of inspiration and creativity. In this article, the authors provide commentaries on a recent branch meeting.

  2. 44. SECOND FLOOR 'ANNEX' INTERIOR VIEW TO SOUTHWEST: Interior ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    44. SECOND FLOOR 'ANNEX' - INTERIOR VIEW TO SOUTHWEST: Interior view towards southwest on second floor of the powerhouse 'annex.' Note the steel column and beam construction and the old shunt car formerly used to move cable cars around the yard. - San Francisco Cable Railway, Washington & Mason Streets, San Francisco, San Francisco County, CA

  3. 45. INTERIOR VIEW TO SOUTHWEST ON SECOND FLOOR: Interior view ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    45. INTERIOR VIEW TO SOUTHWEST ON SECOND FLOOR: Interior view towards southwest on second floor of main portion of the powerhouse and car barn. This space is used for repair and storage of cable cars. Note wooden trussed roof. - San Francisco Cable Railway, Washington & Mason Streets, San Francisco, San Francisco County, CA

  4. 46. INTERIOR VIEW TO SOUTH ON SECOND FLOOR: Interior view ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    46. INTERIOR VIEW TO SOUTH ON SECOND FLOOR: Interior view looking south along the east wall on the second floor of the powerhouse and car barn. Note the cable car truck in the foreground. - San Francisco Cable Railway, Washington & Mason Streets, San Francisco, San Francisco County, CA

  5. 10. DETAIL EXTERIOR VIEW LOOKING NORTHWEST, SHOWING REAR SIDE OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. DETAIL EXTERIOR VIEW LOOKING NORTHWEST, SHOWING REAR SIDE OF REINFORCED CONCRETE GUIDEWALL BUILT ON THE SOUTH SIDE OF THE CHANNEL DOWNSTREAM FROM NAVIGATION LOCK #1. MASONRY RIPRAP ON NORTH SIDE OF CHANNEL IS VISIBLE IN THE CENTER/RIGHT BACKGROUND. - Bonneville Project, Navigation Lock No. 1, Oregon shore of Columbia River near first Powerhouse, Bonneville, Multnomah County, OR

  6. 5. GENERAL EXTERIOR VIEW LOOKING EAST, SHOWING EMPTY NAVIGATION LOCK ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. GENERAL EXTERIOR VIEW LOOKING EAST, SHOWING EMPTY NAVIGATION LOCK #1 WITH DOWNSTREAM MITER GATES OPEN; PHOTO TAKEN FROM MIDDLE OF SWING BRIDGE DOWNSTREAM FROM LOCK. - Bonneville Project, Navigation Lock No. 1, Oregon shore of Columbia River near first Powerhouse, Bonneville, Multnomah County, OR

  7. 6. GENERAL EXTERIOR VIEW LOOKING SOUTHEAST, SHOWING NAVIGATION LOCK #1 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. GENERAL EXTERIOR VIEW LOOKING SOUTHEAST, SHOWING NAVIGATION LOCK #1 FILLED WITH WATER; PHOTO IS TAKEN FROM TOP OF MITER GATES AT DOWNSTREAM END OF LOCK. - Bonneville Project, Navigation Lock No. 1, Oregon shore of Columbia River near first Powerhouse, Bonneville, Multnomah County, OR

  8. 7. GENERAL EXTERIOR VIEW LOOKING EAST, SHOWING NAVIGATION LOCK #1 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. GENERAL EXTERIOR VIEW LOOKING EAST, SHOWING NAVIGATION LOCK #1 FILLED WITH WATER AND CONTAINING A SHIPMENT OF FLOATING LOGS; THE LOCK WILL SOON BE EMPTIED SO THE LOGS CAN CONTINUE THEIR JOURNEY DOWNSTREAM - Bonneville Project, Navigation Lock No. 1, Oregon shore of Columbia River near first Powerhouse, Bonneville, Multnomah County, OR

  9. 3. GENERAL EXTERIOR VIEW LOOKING NORTHWEST, SHOWING BARGE AFTER EXITING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. GENERAL EXTERIOR VIEW LOOKING NORTHWEST, SHOWING BARGE AFTER EXITING FROM DOWNSTREAM END OF NAVIGATION LOCK #1; SWING BRIDGE IS IN PROCESS OF CLOSING. - Bonneville Project, Navigation Lock No. 1, Oregon shore of Columbia River near first Powerhouse, Bonneville, Multnomah County, OR

  10. An Exploratory Investigation of the Impact of National Culture on Motivation and Learning Styles of B-School Students from India

    ERIC Educational Resources Information Center

    Gopalan, Suresh; Cherikh, Moula; Khojasteh, Mak

    2011-01-01

    India has emerged as one of the fastest growing economies in the world. Business magazines and newspapers routinely refer to India as an emerging global powerhouse along with Brazil, China, and Russia (commonly referred to as the BRIC economies). The Indian GDP has experienced a real growth of 8.9 percent from 2003-2007 and is projected to grow by…

  11. 11. INTERIOR OF WEST SIDE ENCLOSED SCREEN PORCH IN OPPOSITE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. INTERIOR OF WEST SIDE ENCLOSED SCREEN PORCH IN OPPOSITE VIEW FROM CA-167-A-8. DOUBLE FRENCH DOORS LEAD TO BEDROOM #2. VIEW TO NORTHEAST. - Big Creek Hydroelectric System, Powerhouse 8, Operator Cottage, Big Creek, Big Creek, Fresno County, CA

  12. 7. VIEW LOOKING ESE FROM THE ROSTRUM AT MERCED RIVER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. VIEW LOOKING ESE FROM THE ROSTRUM AT MERCED RIVER CANYON WITH BRIDALVEIL FALL IN DISTANCE. ELECTRIC STATION, FORMER POWERHOUSE, IN LOWER LEFT. BIG OAK FLAT ROAD CROSSES IMAGE AT CENTER WITH TUNNEL #2 AT LEFT AND TUNNEL #1 AT CENTER. - Big Oak Flat Road Tunnel No. 2, Through mountain spur on New Big Oak Flat Road, Yosemite Village, Mariposa County, CA

  13. STEM Clubs and Science Fair Competitions: Effects on Post-Secondary Matriculation

    ERIC Educational Resources Information Center

    Sahin, Alpaslan

    2013-01-01

    As the global economic competition gets tougher, American policymakers and researchers are interested in finding ways to increase the number of students pursuing STEM (Science, Technology, Engineering, and Mathematics)-related majors in order for the United States to continue its role as an economic powerhouse. A survey study was employed to…

  14. VIEW OF HISTORIC SLATE SWITCHBOARD IN THE CONTROL ROOM OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW OF HISTORIC SLATE SWITCHBOARD IN THE CONTROL ROOM OF THE ELWHA POWERHOUSE, INCLUDING: METERS, PROTECTIVE RELAYS, AND SWITCHES. NOTE ADDITION OF PERSONAL COMPUTERS FOR POWER METERING AND OPERATIONS. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Elwha Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA

  15. 27. DUCT LINES AND HOLES TO BE LEFT IN TRANSFORMER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    27. DUCT LINES AND HOLES TO BE LEFT IN TRANSFORMER ROOM AND GALLERY, MENTONE, MAR. 13, 1904. R.S. MASSON, CONSULTING ELECTRICAL ENGINEER, SAN FRANCISCO AND LOS ANGELES. SCE drawing no. 52319. - Santa Ana River Hydroelectric System, SAR-3 Powerhouse, San Bernardino National Forest, Redlands, San Bernardino County, CA

  16. 6. DAM AFTERBAY, WITH OWYEE RIVER IN FOREGROUND, SHOWING OUTLET ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. DAM AFTERBAY, WITH OWYEE RIVER IN FOREGROUND, SHOWING OUTLET TUNNEL PORTAL (LEFT) AND POWERHOUSE AND ENTRANCE PORTAL TO DAM INTERIOR (RIGHT). NOTE RELEASE OF WATER FROM NEEDLE VALVE NUMBER 2 IN VALVEHOUSE ON DAM. VIEW TO SOUTHEAST. - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  17. 26. Photographic copy of historic construction drawing (December, 1922, original ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    26. Photographic copy of historic construction drawing (December, 1922, original print in possession of St. Paul District, U.S. Army Corps of Engineers) dam and powerhouse foundation. Plan and upstream elevation (north side) - Mississippi River 9-Foot Channel, Lock & Dam No. 1, In Mississippi River at Mississippi Boulevard, below Ford Parkway Bridge, Saint Paul, Ramsey County, MN

  18. 10. DD and GG breaker building and associated conveyors. DD ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. DD and GG breaker building and associated conveyors. DD is coke transfer hous ein foreground; GG is breaker building in center. Coal bunker is tall building to left; 2-story coke conveyor on left brought coal to powerhouse pulverizer. Looking south/southeast - Rouge Steel Company, 3001 Miller Road, Dearborn, MI

  19. 77 FR 64970 - Historic Harrisville, Inc.; Notice of Application Accepted for Filing With the Commission, Intent...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-24

    ... Town of Harrisville, Cheshire County, New Hampshire. The project would not occupy lands of the United... new generator with an installed capacity of 90 kilowatts; (6) an existing discharge portal in the bottom of the powerhouse; (7) a new 50-foot-long, 208-volt transmission line located in the...

  20. 18. Credit Pelton Water Wheel Company. View from the older ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. Credit Pelton Water Wheel Company. View from the older portion of the powerhouse with the 750 kW 1901 generating units in the left foreground. An exciter unit and the switchboard are in the right foreground. (Pelton Water Wheel Company, Pelton Impulse & Reaction Turbine Installations, 1920, p. 33). - Battle Creek Hydroelectric System, Battle Creek & Tributaries, Red Bluff, Tehama County, CA

  1. 75 FR 73068 - Notice of Competing Preliminary Permit Applications Accepted for Filing and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-29

    ... dam, requiring removal of part of the left dam abutment; (2) a proposed powerhouse containing four... feasibility of hydropower at the U.S. Army Corps of Engineers (Corps) Monongahela River Lock & Dam No. 4.... Descriptions of the proposed Monongahela River Lock & Dam No. 4 Projects: Lock Hydro Friends Fund...

  2. 8. Historic American Buildings Survey Photocopy of an old view, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. Historic American Buildings Survey Photocopy of an old view, ca. 1920 From collection of Anna B. Scherer, Lees Summit, Mo. SOUTHEAST AND NORTHEAST FACADES WITH GARAGE/POWERHOUSE PRIOR TO GREENHOUSE MANGER'S HOUSE - Longview Farm, Greenhouses, Lees Summit, Jackson County, MO

  3. 1. Perspective view of east and south elevations of Riverdale ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Perspective view of east and south elevations of Riverdale Cotton Mill. The spinning room is located on the third floor, carding room on second floor and machine/maintenance shop on first floor. South elevation of Georgia Power powerhouse adjacent to Riverdale Mill appears on right. - Riverdale Cotton Mill, Corner of Middle & Lower Streets, Valley, Chambers County, AL

  4. 78 FR 62357 - Georgia Power Company; Notice of Application Accepted for Filing, Soliciting Motions To Intervene...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-21

    ..., 2012. d. Applicant: Georgia Power Company. e. Name of Project: Bartletts Ferry Hydroelectric Project. f... number P-485-065. The Commission's Rules of Practice require all intervenors filing documents with the..., two powerhouses, and a 5,850-acre reservoir (Bartletts Ferry Reservoir or Lake Harding) at a...

  5. 15. Potential Transformer for Unit 2 and Operating Floor Front ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Potential Transformer for Unit 2 and Operating Floor Front Corridor, view to the east-southeast. - Washington Water Power Clark Fork River Cabinet Gorge Hydroelectric Development, Powerhouse, North Bank of Clark Fork River at Cabinet Gorge, Cabinet, Bonner County, ID

  6. 33. A.C. PANEL FOR MENTONE POWER HOUSE, P.L. & P. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    33. A.C. PANEL FOR MENTONE POWER HOUSE, P.L. & P. CO., LOS ANGELES. RETRACED FROM MASSON'S DRAWING NO. C-275. JAN. 20, 1909. SCE drawing no. 52880. - Santa Ana River Hydroelectric System, SAR-3 Powerhouse, San Bernardino National Forest, Redlands, San Bernardino County, CA

  7. 10. BOILER #16 (BUILDING L8) TO LEFT, L.P. AND H.P. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. BOILER #16 (BUILDING L8) TO LEFT, L.P. AND H.P. BOILER ROOMS (BUILDINGS L4 AND L2) TO RIGHT, AND STEPHENS SUBSTATION (BUILDING L6) IN BACKGROUND, FROM THE ROOF OF THE POWERHOUSE EXTENSION (BUILDING L5) - Portland General Electric Company, Station "L", 1841 Southeast Water Street, Portland, Multnomah County, OR

  8. The Indian Vocational Education and Training (VET) System: Status, Challenges, and Options

    ERIC Educational Resources Information Center

    Kotamraju, Pradeep

    2014-01-01

    India is at the cusp of becoming an economic powerhouse. For that to happen, however, the country needs to alter its workforce education system by reengineering the Indian Vocational Education and Training (VET) System. India's VET strategy includes creating basic work-centered common curriculum for the unskilled; developing a more flexible…

  9. 30. PLAN AND SECTIONS SHOWING INSTALLATION OF HYDRAULIC TURBINE UNIT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    30. PLAN AND SECTIONS SHOWING INSTALLATION OF HYDRAULIC TURBINE UNIT FROM KAWEAH NO. 2 REPLACING EXISTING UNIT, SANTA ANA RIVER NO. 3, JUNE 21, 1945. SCE drawing no. 523126-1. - Santa Ana River Hydroelectric System, SAR-3 Powerhouse, San Bernardino National Forest, Redlands, San Bernardino County, CA

  10. 4. VIEW OF TURBINE PIT AT UNIT 3 SHOWING SERVOMOTOR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. VIEW OF TURBINE PIT AT UNIT 3 SHOWING SERVO-MOTOR HEADS (BACKGROUND AT CENTER) WITH PISTON RODS BOLTED TO TURBINE GATE OPERATION RING (CENTER AT LEFT AND CENTER AT RIGHT). VIEW TO THE NORTH-NORTHWEST. - Black Eagle Hydroelectric Facility, Powerhouse, Great Falls, Cascade County, MT

  11. 10. Turbine Pit of Unit 5, view to the north. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. Turbine Pit of Unit 5, view to the north. Note the difference in configuration within this turbine pit as compared to one of the original pits illustrated in photograph number MT-105-A-11. - Washington Water Power Clark Fork River Noxon Rapids Hydroelectric Development, Powerhouse, South bank of Clark Fork River at Noxon Rapids, Noxon, Sanders County, MT

  12. 5. NHP, Water Turbine Section, southernmost steel standpipe base with ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. NHP, Water Turbine Section, southern-most steel standpipe base with concrete curbing, constructed in 1908-1909, and turbine shaft entry portals in west wall of Powerhouse Section. View is to the Northeast. - Nunn Hydroelectric Plant, On Madison River, Ennis, Madison County, MT

  13. 13. LONGITUDINAL VIEW OF THE SIX TURBINEGENERATOR UNITS (NO.'S 15 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. LONGITUDINAL VIEW OF THE SIX TURBINE-GENERATOR UNITS (NO.'S 1-5 ARE ORIGINAL). TURBINE-GENERATOR NO.1 IS IN THE FOREGROUND, LOOKING WEST. - Washington Water Power Company Post Falls Power Plant, Middle Channel Powerhouse & Dam, West of intersection of Spokane & Fourth Streets, Post Falls, Kootenai County, ID

  14. 14. TURBINEGENERATOR UNIT NO.4: VIEW SHOWS PENSTOCK ENTERING THE TURBINE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. TURBINE-GENERATOR UNIT NO.4: VIEW SHOWS PENSTOCK ENTERING THE TURBINE (BACKGROUND), ORIGINAL LOMBARD GOVERNOR (RIGHT BACKGROUND), AND ORIGINAL EXCITER (FOREGROUND). - Washington Water Power Company Post Falls Power Plant, Middle Channel Powerhouse & Dam, West of intersection of Spokane & Fourth Streets, Post Falls, Kootenai County, ID

  15. 6. NHP, Water Turbine Section, northernmost steel standpipe base with ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. NHP, Water Turbine Section, northern-most steel standpipe base with concrete curbing, constructed in 1908-1909, and turbine shaft entry portal in west wall of Powerhouse Section. View is to the Northeast. - Nunn Hydroelectric Plant, On Madison River, Ennis, Madison County, MT

  16. 76 FR 73619 - Francis Walter Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-29

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Francis Walter Hydro, LLC; Notice of Preliminary Permit Application Accepted... outlet; (2) a concrete powerhouse 50 feet long by 75 feet wide; (3) two 4.5-megawatt (MW) ]...

  17. 75 FR 11153 - Main Mill Street Investments, LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-10

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Main Mill Street Investments, LLC; Notice of Preliminary Permit Application... impoundment; (3) an existing 77-foot-long by 26-foot-wide powerhouse; (4) two new turbine generator units...

  18. 7. Photocopy of Elevations drawing (from the BPA Engineering Vault, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Photocopy of Elevations drawing (from the BPA Engineering Vault, Drawing C13-J2-342-D1, Sheet 3, 13 March 1939) - Bonneville Power Administration South Bank Substation, I-84, South of Bonneville Dam Powerhouse, Bonneville, Multnomah County, OR

  19. 10. Photocopy of Miscellaneous Details drawing showing door, window, louvre, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. Photocopy of Miscellaneous Details drawing showing door, window, louvre, stairway, roof and other detailing (from the BPA Engineering Vault, Drawing C13-J2-342-D1, Sheet 4, 13 March 1939) - Bonneville Power Administration South Bank Substation, I-84, South of Bonneville Dam Powerhouse, Bonneville, Multnomah County, OR

  20. 9. Photocopy of Reinforced Concrete Details drawing (from the BPA ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. Photocopy of Reinforced Concrete Details drawing (from the BPA Engineering Vault, Drawing C13-J2-342-D1, Sheet 6, 13 March 1939) - Bonneville Power Administration South Bank Substation, I-84, South of Bonneville Dam Powerhouse, Bonneville, Multnomah County, OR

  1. 17. Photocopy of photograph showing excavation of South Bank Substation ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. Photocopy of photograph showing excavation of South Bank Substation site, 15 May 1939 (from the BPA Photo Archives, Portland, Oregon, Negative No. 345), LOOKING WEST - Bonneville Power Administration South Bank Substation, I-84, South of Bonneville Dam Powerhouse, Bonneville, Multnomah County, OR

  2. Close up of backup exciter showing induction motor at left ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Close up of backup exciter showing induction motor at left and direct current generator at right. View to west - Mystic Lake Hydroelectric Facility, Powerhouse, Along West Rosebud Creek, 1 3/4 miles northeast of Mystic Lake Dam, Fishtail, Stillwater County, MT

  3. Overview of generating floor showing backup exciter in right foreground, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Overview of generating floor showing backup exciter in right foreground, turbine-generator units 1 and 2 at left, modern replacement governor right of center, and penstock valve stand in right background. View to south - Mystic Lake Hydroelectric Facility, Powerhouse, Along West Rosebud Creek, 1 3/4 miles northeast of Mystic Lake Dam, Fishtail, Stillwater County, MT

  4. Lessons from Portugal

    ERIC Educational Resources Information Center

    Harry, Vickie; Mechling, Ken

    2010-01-01

    Portugal has long been touted as a popular destination for savvy travelers, but now educators are touting it as something else--a professional development (PD) powerhouse for inquiry-based science! This article describes Portugal's ongoing efforts to reform its country's elementary science education program through a project known as the…

  5. Latino Workers Hitting a Blue-Collar Ceiling. New Journalism on Latino Children

    ERIC Educational Resources Information Center

    Fuller, Bruce; McElmurry, Sara

    2011-01-01

    Chicago has a dynamic history of embracing change, evolving from an agricultural and commercial hub to the steel powerhouse that would undergird America's industrial revolution. The "City of Big Shoulders" now bears a sizeable burden, one that again requires it to embrace change. The metro area must shift to an economy built on knowledge…

  6. 78 FR 26339 - Exelon Generation Company, LLC; Notice of Application Accepted for Filing, Soliciting Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-06

    ... prior registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp . You must...,000 cfs. Water flowing through the turbines is discharged via the draft tubes into the Susquehanna River adjacent to the powerhouse. The units are equipped with trash racks between the draft tube...

  7. 76 FR 20652 - Symbiotics, LLC; Notice of Application Tendered for Filing With the Commission and Establishing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-13

    ... regulating tube valves and combine into a 10-foot-diameter by 68-foot-long penstock that would deliver flow... powerhouse draft tube to prevent non-native fish species from surviving Kaplan turbine passage into the... inspection and reproduction at the address in item (h) above. m. You may also register online at...

  8. 149. Interior of Room B3, Air Compressor Room, showing a ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    149. Interior of Room B-3, Air Compressor Room, showing a ca. 1960s Worthington air compressor used to provide compressed air for powerhouse; air compressor powered by an electric motor; stairway (far left) leads to the generator room. Looking south. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power & Light Company, White River Hydroelectric Project, 600 North River Avenue, Dieringer, Pierce County, WA

  9. 78 FR 38308 - Gresham Municipal Utilities; Notice of Application Tendered for Filing With the Commission and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-26

    ...: Subsequent License. b. Project No.: 2464-015. c. Date filed: June 10, 2013. d. Applicant: Gresham Municipal.... Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r). h. Applicant Contact: Gresham Municipal... powerhouse with one 500-kW turbine-generator unit and one 120-kW turbine-generator united having a...

  10. Fish Passage: A New Tool to Investigate Fish Movement: JSATS

    SciTech Connect

    McMichael, Geoffrey A.; Harnish, Ryan A.; Weiland, Mark A.; Deng, Zhiqun; Eppard, Matthew B.

    2011-04-20

    A new system is being used to determine fish mortality issues related to hydroelectric facilities in the Pacific Northwest. Called the juvenile salmon acoustic telemetry system (JSATS), this tool allows researchers to better understand fish movement, behavior, and survival around dams and powerhouses.

  11. Genetic mapping of paternal sorting of mitochondria in cucumber

    Technology Transfer Automated Retrieval System (TEKTRAN)

    Mitochondria are organelles that have their own DNA; serve as the powerhouses of eukaryotic cells; play important roles in stress responses, programmed cell death, and ageing; and in the vast majority of eukaryotes, are maternally transmitted. Strict maternal transmission of mitochondria makes it di...

  12. Aerospace Training. Washington's Community and Technical Colleges

    ERIC Educational Resources Information Center

    Washington State Board for Community and Technical Colleges, 2014

    2014-01-01

    Aerospace is an economic powerhouse that generates jobs and fuels our economy. Washington's community and technical colleges produce the world-class employees needed to keep it that way. With about 1,250 aerospace-related firms employing more than 94,000 workers, Washington has the largest concentration of aerospace expertise in the nation. To…

  13. 78 FR 52172 - Don W. Gilbert Hydro Power, LLC; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-22

    ... temporarily increase soil erosion during vegetation clearing and excavation for the drop inlet structure... Gilbert Hydro but with site-specific measures, would minimize project effects on soil erosion. Operating..., powerhouse, and transmission line could cause a minor amount of soil erosion. Gilbert Hydro's proposal...

  14. GOVERNOR FOR #3 GENERATOR INSIDE ELWHA POWERHOUSEWOODWARD WATERWHEEL GOVERNOR TYPE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    GOVERNOR FOR #3 GENERATOR INSIDE ELWHA POWERHOUSE--WOODWARD WATERWHEEL GOVERNOR TYPE HR: 21,500 LBS OF THRUST, SIZE 11 BORE & STROKE. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Elwha Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA

  15. 16. Bus Room (also known as Switch Gear Room), view ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. Bus Room (also known as Switch Gear Room), view to the southeast. An air circuit breaker compressor (visible in photograph number 2) was once attached to the main bus relay visible in the background of the photograph. - Washington Water Power Clark Fork River Cabinet Gorge Hydroelectric Development, Powerhouse, North Bank of Clark Fork River at Cabinet Gorge, Cabinet, Bonner County, ID

  16. 76 FR 29744 - Reliable Storage 2, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-23

    ... feet below the ground surface; (2) a reinforced concrete intake/outlet structure capable of discharging... vertical intake shaft; (4) an 8-foot-diameter underground penstock; (5) a powerhouse approximately 1,300... below the ground surface; (2) a reinforced concrete intake/outlet structure capable of discharging...

  17. 52. VIEW NORTHEAST ACROSS WINDING MACHINERY: Overall view towards northwest ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    52. VIEW NORTHEAST ACROSS WINDING MACHINERY: Overall view towards northwest of the winding machinery on the first floor of the Washington and Mason Streets powerhouse and car barn. Photograph taken from museum mezzanine looking along the tension runs. - San Francisco Cable Railway, Washington & Mason Streets, San Francisco, San Francisco County, CA

  18. 118. Photocopy of original construction drawing, dated 21 May 1935 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    118. Photocopy of original construction drawing, dated 21 May 1935 (Original print in the possession of U.S. Army Corps of Engineers, Portland District, Portland, OR.) (P-10-59) UPPER PIPE GALLERY - OIL STORAGE AND SEWAGE DISPOSAL, EL +23.5. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  19. 108. Photocopy of original construction drawing, dated 15 December 1934 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    108. Photocopy of original construction drawing, dated 15 December 1934 (Original print in the possession of U.S. Army Corps of Engineers, Portland District, Portland, OR.) (P-5-310, Sheet 2 of 2) SCROLL CASE DESIGN. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  20. 105. Photocopy of original construction drawing, dated 23 November 1934 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    105. Photocopy of original construction drawing, dated 23 November 1934 (Original print in the possession of U.S. Army Corps of Engineers, Portland District, Portland, OR.) (P-5-310, Sheet 1 of 2) SCROLL CASE DESIGN. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  1. 1000 Years of the Olympic Games: Treasures of Ancient Greece--Digital Reconstruction at the Home of the Gods.

    ERIC Educational Resources Information Center

    Kenderdine, Sarah

    This paper results from a recently completed project that augmented an exhibition at the Powerhouse Museum, Sydney, entitled "1000 Years of the Olympic Games: Treasures of Ancient Greece" (July 18-November 18, 2000). This Exhibition offered an opportunity to supplement the traditional visitor experience with the introduction of "virtual reality"…

  2. 77 FR 10503 - Fall River Community Hydro Project; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-22

    ... file a license application during the permit term. A preliminary permit does not authorize the permit... penstock connecting the conduit to the powerhouse; (3) two pump-turbines totaling 900 kilowatts (kW) (1 x 300 kW unit and 1 x 600 kW unit) of generating capacity; and (4) an existing 3-phase power line...

  3. 77 FR 38795 - Dolores Water Conservancy District; Notice of Competing Preliminary Permit Application Accepted...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ... file a license application during the permit term. A preliminary permit does not authorize the permit... underground powerhouse containing two reversible pump-turbines totaling 500 megawatts (MW) (2 units x 250 MW... the Commission strongly encourages electronic filing, documents may also be paper-filed. To...

  4. 50. INTERIOR VIEW TO SOUTH AT FIRST FLOOR MACHINE SHOP: ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    50. INTERIOR VIEW TO SOUTH AT FIRST FLOOR MACHINE SHOP: Interior view towards south of the machine shop located on the first floor of the powerhouse and car barn. Compare this view with CA-12-74, taken seventeen years earlier. - San Francisco Cable Railway, Washington & Mason Streets, San Francisco, San Francisco County, CA

  5. 78 FR 73853 - Oliver Hydro LLC; Notice of Application Ready for Environmental Analysis and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-09

    ... facilities: (1) A forebay; (2) an intake structure; (3) a powerhouse containing two generating units with a... utilizing surplus water from the William Bacon Oliver Lock and Dam, as directed by the Corps. m. A copy of... notice: (1) A copy of the water quality certification; (2) a copy of the request for...

  6. Hunt for Federal Funds Gives Classified Research a Lift

    ERIC Educational Resources Information Center

    Basken, Paul

    2012-01-01

    For some colleges and professors, classified research promises prestige and money. Powerhouses like the Massachusetts Institute of Technology and the Johns Hopkins University have for decades run large classified laboratories. But most other universities either do not allow such research or conduct it quietly, and in small doses. The…

  7. 76 FR 28459 - Notice of Lodging of Consent Decree Under the Comprehensive Environmental Response, Compensation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-17

    ... New Jersey. The Decree resolves the United States' claims against the Defendants under Section 104 of... the Defendant Alsol Corporation's failure to provide entry and site access to EPA at the Michelin Powerhouse Superfund Site, located in Milltown, Middlesex County, New Jersey. The Department of Justice...

  8. 26. GENERAL EXTERIOR VIEW LOOKING EAST, SHOWING FISH LADDER ON ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    26. GENERAL EXTERIOR VIEW LOOKING EAST, SHOWING FISH LADDER ON WASHINGTON SHORE ADJACENT TO UPSTREAM FACE OF THE DAM/SPILLWAY. Photograph Nos. OR-11-F-27 through OR-11-F-94 are photocopies of photographs. Original historic photographs are located at the Bonneville Powerhouse, Bonneville, Oregon. - Bonneville Project, Bonneville Dam, Columbia River, Bonneville, Multnomah County, OR

  9. Integrative Literature Review: Human Capital Planning--A Review of Literature and Implications for Human Resource Development

    ERIC Educational Resources Information Center

    Zula, Kenneth J.; Chermack, Thomas J.

    2007-01-01

    The shift in the U.S. economy from a manufacturing powerhouse to a service-driven economy has placed a great emphasis on human capital planning within organizations in order to remain competitive in a new global economy. The link between critical business strategy and the successful implementation of strategy has been well documented in the…

  10. 75 FR 63450 - Wilkesboro Hydroelectric Company; Notice of Application Ready for Environmental Analysis and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-15

    ...Support@ferc.gov , or toll-free at 1-866-208-3676, or for TTY, (202) 502-8659. Although the Commission...-jet-type fixed cone valve; (5) an 80-foot-long by 30-foot-wide powerhouse containing one 2.0-MW...

  11. 78 FR 26359 - Community of Elfin Cove, DBA Elfin Cove Utility Commission; Notice of Preliminary Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-06

    ...-foot-long, 8-foot- wide, 3-foot-deep cobble-lined tailrace discharging flows into Jim's Lake; (5) an... powerhouse containing a 125-kW Pelton or impulse turbine; (4) a 150-foot-long, 8- foot-wide, 3-foot-deep....2001(a)(1)(iii) and the instructions on the Commission's Web site...

  12. 76 FR 38383 - Ballville Hydroelectric Group, LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-30

    ...; (2) a new concrete powerhouse, 40 feet wide by 50 feet long by 30 feet deep; (3) the existing 50-foot-long by 20-foot-wide by 30-foot- deep intake structure; (4) two new 500-kilowatt Kaplan turbine...) and the instructions on the Commission's Web site (...

  13. 7. VIEW OF THE MODERN SUBSTATION (FOREGROUND), WITH THE OLD ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. VIEW OF THE MODERN SUBSTATION (FOREGROUND), WITH THE OLD SWITCHING BUILDING IN THE BACKGROUND, LOOKING SOUTHWEST. - Washington Water Power Company Post Falls Power Plant, Middle Channel Powerhouse & Dam, West of intersection of Spokane & Fourth Streets, Post Falls, Kootenai County, ID

  14. 77 FR 23477 - City of New York; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-19

    ... capacity of 441,000 acre-feet and normal water surface elevation of 1,280 feet mean sea level; (3) a... elevation of 1,440 feet mean sea level; (3) a proposed powerhouse containing one new generating unit...

  15. Robert L. Gross, Well-Grounded in High-Flying Singapore

    ERIC Educational Resources Information Center

    Goldman, Jay P.

    2005-01-01

    Could a North Dakota farm boy with a smallish frame, bookish appearance, understated speaking voice and aw-shucks humility possibly be a good fit to lead a powerhouse, cosmopolitan private school for American students living abroad, whose governing board consists mainly of high-flying corporate executives and well-heeled attorneys? The answer…

  16. 76 FR 67182 - Riverbank Hydro No. 3 LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... structure; (3) a powerhouse containing two generating units with a total capacity of 18.0 megawatts (MW); (4) a tailrace structure; and (5) 8.1-mile-long, 25 kilo-volt (KV) transmission line. The project would..., Riverbank Power Corporation, Royal Bank Plaza, South Tower, P.O. Box 166, 200 Bay Street, Suite...

  17. 9. VIEW OF THE TRASH RAKES, TRASH RAKE GATELIFTING MECHANISM, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. VIEW OF THE TRASH RAKES, TRASH RAKE GATE-LIFTING MECHANISM, AND SHED ROOF (REMOVED AUTUMN OF 1996), WITH TRASH LOG LIFTING MECHANISM IN FOREGROUND, LOOKING WEST. - Washington Water Power Company Post Falls Power Plant, Middle Channel Powerhouse & Dam, West of intersection of Spokane & Fourth Streets, Post Falls, Kootenai County, ID

  18. 11. VIEW SHOWING THE SUPERSTRUCTURE OF THE SHED ROOF (REMOVED ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. VIEW SHOWING THE SUPERSTRUCTURE OF THE SHED ROOF (REMOVED AUTUMN OF 1996) PROTECTING THE PRESENT INTAKE GATES- AND RAKE-LIFTING MECHANISMS AND THE TRASH RACKS (LOWER FOREGROUND), LOOKING NORTH. - Washington Water Power Company Post Falls Power Plant, Middle Channel Powerhouse & Dam, West of intersection of Spokane & Fourth Streets, Post Falls, Kootenai County, ID

  19. 75 FR 16092 - Lockhart Power Company; Notice of Application Accepted for Filing, Soliciting Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-31

    ... spacing with a trash rake; (4) a new 24-foot-wide by 40-foot-long concrete powerhouse that would contain a....375-inch clear bar spacing and a trash rake; (5) a 100-foot-long by 10-foot-diameter penstock; (6)...

  20. 12. CLOSEUP OF THE CURRENT TRASH RAKELIFTING MECHANISM (CALLED 'JAWS' ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. CLOSE-UP OF THE CURRENT TRASH RAKE-LIFTING MECHANISM (CALLED 'JAWS' BY THE PRESENT OPERATORS), LOOKING WEST. THIS EQUIPMENT WAS REMOVED IN AUTUMN OF 1996. - Washington Water Power Company Post Falls Power Plant, Middle Channel Powerhouse & Dam, West of intersection of Spokane & Fourth Streets, Post Falls, Kootenai County, ID

  1. NORTH AND WEST SIDES OF OIL HOUSE IN RIGHT FOREGROUND, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    NORTH AND WEST SIDES OF OIL HOUSE IN RIGHT FOREGROUND, WITH EMBANKMENT (MI-100-A) IN LEFT FOREGROUND, AND POWERHOUSE (MI-100-B) AND SUBSTATION (MI-100-C) AT CENTER AND LEFT BACKGROUND. VIEW TO SOUTHEAST - Hardy Hydroelectric Plant, Oil House, 6928 East Thirty-sixth Street, Newaygo, Newaygo County, MI

  2. 75 FR 42730 - Goodwin Power, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-22

    ... located at the existing Goodwin dam \\1\\ and would harness water that currently flows over the spillway of...- foot-long, 20-foot-wide tailrace canal that would take water from the powerhouse to the river bed; (5... Irrigation District and San Joaquin Irrigation District. \\2\\ Tulloch dam is a component of the...

  3. 12. VIEW OF THE NORTH END, STATION 'L', FROM THE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. VIEW OF THE NORTH END, STATION 'L', FROM THE ROOF OF POWERHOUSE EXTENSION (BUILDING L5), WELDING SHOP (BUILDING F) IN FOREGROUND, PEPCO BUILDING (BUILDING A) IN BACKGROUND - Portland General Electric Company, Station "L", 1841 Southeast Water Street, Portland, Multnomah County, OR

  4. 40. 1911 ELECTRIC MOTOR INSTALLATION: Photocopy of July 1911 photograph ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    40. 1911 ELECTRIC MOTOR INSTALLATION: Photocopy of July 1911 photograph showing the installed 600hp General Electric motor at the Washington and Mason Streets powerhouse. View towards the south wall of the first floor. Note the engineer's shack and switchboard behind the motor and its pinion gear. - San Francisco Cable Railway, Washington & Mason Streets, San Francisco, San Francisco County, CA

  5. 76 FR 69721 - Goat Lake Hydro, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-09

    ... Power Act (FPA), proposing to study the feasibility of the Connelly Lake Hydropower Project (Connelly... Chilkoot River; (5) a 40-foot-long, 60-foot-wide powerhouse to contain two turbine/ generating units with a total installed capacity of 12 megawatts, with a hydraulic capacity of 90 cubic feet per second, and...

  6. 75 FR 47808 - Verde Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-09

    ... the Federal Power Act, proposing to study the feasibility of the Verde Hydroelectric Project, located... with an 823-ft length at crest and hydraulic head of 251-ft; (2) two existing 72-inch diameter steel... powerhouse containing three new pump/turbine generating units having an installed capacity of 10- to...

  7. 18 CFR 16.3 - Public notice of projects under expiring licenses.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... report and annually in the Federal Register, a table showing the projects whose licenses will expire... dates; and (b) Contain the following information: license expiration date; licensee's name; project number; type of principal project works licensed, e.g., dam and reservoir, powerhouse, transmission...

  8. 18 CFR 16.3 - Public notice of projects under expiring licenses.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... report and annually in the Federal Register, a table showing the projects whose licenses will expire... dates; and (b) Contain the following information: license expiration date; licensee's name; project number; type of principal project works licensed, e.g., dam and reservoir, powerhouse, transmission...

  9. 18 CFR 16.3 - Public notice of projects under expiring licenses.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... report and annually in the Federal Register, a table showing the projects whose licenses will expire... dates; and (b) Contain the following information: license expiration date; licensee's name; project number; type of principal project works licensed, e.g., dam and reservoir, powerhouse, transmission...

  10. 18 CFR 16.3 - Public notice of projects under expiring licenses.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... report and annually in the Federal Register, a table showing the projects whose licenses will expire... dates; and (b) Contain the following information: license expiration date; licensee's name; project number; type of principal project works licensed, e.g., dam and reservoir, powerhouse, transmission...

  11. 75 FR 70730 - EBD Hydro; Notice of Application Accepted for Filing and Soliciting Comments, Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-18

    ... public inspection: a. Type of Application: Conduit Exemption. b. Project No.: 13817-000. c. Date filed...- long, 96-inch diameter reinforced Krah/HDPE pipe; (3) a proposed powerhouse containing three proposed...-mail FERCOnlineSupport@ferc.gov . For TTY, call (202) 502-8659. A copy is also available for review...

  12. 9. Generator Barrel and Rotor of Unit 1, view to ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. Generator Barrel and Rotor of Unit 1, view to the southeast, showing part of the rotor and generator coils along top of photograph and southeast entry stairwell and doors in lower center of photograph. - Washington Water Power Clark Fork River Noxon Rapids Hydroelectric Development, Powerhouse, South bank of Clark Fork River at Noxon Rapids, Noxon, Sanders County, MT

  13. 9. VIEW OF FRANCIS TURBINE, GENERATOR DRIVE SHAFT. NOTE ORIGINAL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. VIEW OF FRANCIS TURBINE, GENERATOR DRIVE SHAFT. NOTE ORIGINAL EXCITER AND GENERATOR RHEOSTATS ATOP CONTROL PANEL AT REAR. CONTROL PANEL IS ORIGINAL EXCEPT FOR HORIZONTAL TOP PANEL WITH CLOCK AT LEFT AND SYNCHROSCOPE AT RIGHT, LOOKING EAST - Centerville Hydroelectric System, Powerhouse, Butte Creek, Centerville, Butte County, CA

  14. 4. VIEW OF GOVERNANCE EQUIPMENT FOR EXCITER UNIT 2 SHOWING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. VIEW OF GOVERNANCE EQUIPMENT FOR EXCITER UNIT 2 SHOWING GOVERNOR STAND (RIGHT FOREGROUND) AND PRESSURE TANK (RIGHT CENTER) IN FRONT OF EXCITER GENERATOR (BACKGROUND). VIEW TO SOUTHEAST. - Ryan Hydroelectric Facility, Powerhouse, On Missouri River, northeast of Great Falls, Great Falls, Cascade County, MT

  15. 2. VIEW OF GOVERNANCE EQUIPMENT AT UNIT 4 GENERATOR (BACKGROUND) ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. VIEW OF GOVERNANCE EQUIPMENT AT UNIT 4 GENERATOR (BACKGROUND) SHOWING GOVERNOR STAND (RIGHT FOREGROUND) AND PRESSURE TANK (LEFT FOREGROUND). VIEW TO SOUTH-SOUTHWEST. - Ryan Hydroelectric Facility, Powerhouse, On Missouri River, northeast of Great Falls, Great Falls, Cascade County, MT

  16. 3. RUSTIC BENCH AT THE LADDER CREEK GARDENS NEAR GORGE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. RUSTIC BENCH AT THE LADDER CREEK GARDENS NEAR GORGE POWERHOUSE AT NEWHALEM. J.D. ROSS HAD THE GROUNDS LANDSCAPED AND PLANTED WITH EXOTIC FLOWERS AND VEGETATION DURING THE 1930S AS AN ADDITIONAL TOURIST ATTRACTION, 1989. - Skagit Power Development, Skagit River & Newhalem Creek Hydroelectric Project, On Skagit River, Newhalem, Whatcom County, WA

  17. 153. View of lightning arrester houses on the hillside above ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    153. View of lightning arrester houses on the hillside above powerhouse (similar view as WA-64-152). Looking southeast. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power & Light Company, White River Hydroelectric Project, 600 North River Avenue, Dieringer, Pierce County, WA

  18. 152. View of lightning arrester houses on the hillside above ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    152. View of lightning arrester houses on the hillside above powerhouse. To the right is surge tank for penstock no. 1. Looking southeast. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power & Light Company, White River Hydroelectric Project, 600 North River Avenue, Dieringer, Pierce County, WA

  19. 22. Photographic copy of original construction drawing, ca. 1916 (drawing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    22. Photographic copy of original construction drawing, ca. 1916 (drawing located at the Thompson Falls Hydroelectric Project, Thompson Falls, Montana). Architect unknown. POWERHOUSE FOREMAN'S BUNGALOW; FIRST FLOOR PLAN. - Thompson Falls Hydroelectric Project, Power Foreman's Bungalow, On island between Forebay Channel & ClarkFord River, Thompson Falls, Sanders County, MT

  20. 12. CONTROL PANELS, WEST SIDE (LEFT & RIGHT), MAIN FLOOR: ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. CONTROL PANELS, WEST SIDE (LEFT & RIGHT), MAIN FLOOR: CENTER OF CLUSTERS, TOP BOX: MEGAWATT METER CENTER OF CLUSTERS, LOWER THREE BOXES: AMPERE METERS LEFT SIDE OF CLUSTERS: VOLTAGE CHART RECORDER RIGHT SIDE OF CLUSTERS: RECLOSE RELAY CENTER UNDER CLUSTERS: TESTING SWITCHES BELOW TESTING SWITCHES: BREAKER SWITCHES - Bonneville Power Administration South Bank Substation, I-84, South of Bonneville Dam Powerhouse, Bonneville, Multnomah County, OR