Science.gov

Sample records for 100-b-18 184-b powerhouse

  1. Remaining Sites Verification Package for the 100-B-18, 184-B Powerhouse Debris Pile, Waste Site Reclassification Form 2007-020

    SciTech Connect

    L. M. Dittmer

    2007-11-30

    The 100-B-18 Powerhouse Debris Pile contained miscellaneous demolition waste from the decommissioning activities of the 184-B Powerhouse. The debris covered an area roughly 15 m by 30 m and included materials such as concrete blocks, mixed aggregate/concrete slabs, stone rubble, asphalt rubble, traces of tar/coal, broken fluorescent lights, brick chimney remnants, and rubber hoses. In accordance with this evaluation, the verification sampling results support a reclassification of this site to Interim Closed Out. The results of verification sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River.

  2. TMEM184b Promotes Axon Degeneration and Neuromuscular Junction Maintenance.

    PubMed

    Bhattacharya, Martha R C; Geisler, Stefanie; Pittman, Sara K; Doan, Ryan A; Weihl, Conrad C; Milbrandt, Jeffrey; DiAntonio, Aaron

    2016-04-27

    Complex nervous systems achieve proper connectivity during development and must maintain these connections throughout life. The processes of axon and synaptic maintenance and axon degeneration after injury are jointly controlled by a number of proteins within neurons, including ubiquitin ligases and mitogen activated protein kinases. However, our understanding of these molecular cascades is incomplete. Here we describe the phenotype resulting from mutation of TMEM184b, a protein identified in a screen for axon degeneration mediators. TMEM184b is highly expressed in the mouse nervous system and is found in recycling endosomes in neuronal cell bodies and axons. Disruption of TMEM184b expression results in prolonged maintenance of peripheral axons following nerve injury, demonstrating a role for TMEM184b in axon degeneration. In contrast to this protective phenotype in axons, uninjured mutant mice have anatomical and functional impairments in the peripheral nervous system. Loss of TMEM184b causes swellings at neuromuscular junctions that become more numerous with age, demonstrating that TMEM184b is critical for the maintenance of synaptic architecture. These swellings contain abnormal multivesicular structures similar to those seen in patients with neurodegenerative disorders. Mutant animals also show abnormal sensory terminal morphology. TMEM184b mutant animals are deficient on the inverted screen test, illustrating a role for TMEM184b in sensory-motor function. Overall, we have identified an important function for TMEM184b in peripheral nerve terminal structure, function, and the axon degeneration pathway. Our work has identified both neuroprotective and neurodegenerative roles for a previously undescribed protein, TMEM184b. TMEM184b mutation causes delayed axon degeneration following peripheral nerve injury, indicating that it participates in the degeneration process. Simultaneously, TMEM184b mutation causes progressive structural abnormalities at neuromuscular

  3. 4. POWERHOUSE, GROUND LEVEL, GENERATOR AND EXCITER LOCATED IN POWERHOUSE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. POWERHOUSE, GROUND LEVEL, GENERATOR AND EXCITER LOCATED IN POWERHOUSE AT GROUND LEVEL LOOKING NORTHEAST - Dayville Mills Hydroelectric Facility, Powerhouse, North side of Route 101, .5 mile west of Route 395, Killingly Center, Windham County, CT

  4. 16. EXTERIOR NORTH END OF TULE RIVER POWERHOUSE SHOWING POWERHOUSE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. EXTERIOR NORTH END OF TULE RIVER POWERHOUSE SHOWING POWERHOUSE AT PHOTO CENTER, SUBSTATION AT PHOTO RIGHT FOREGROUND, OFFICE BEHIND SUBSTATION AT RIGHT OF POWERHOUSE, AND MACHINE SHOP AT LEFT OF POWERHOUSE. THIS PHOTOGRAPH DUPLICATES HISTORIC VIEW SHOWN IN PHOTO CA-216-17. VIEW TO SOUTHEAST. - Tule River Hydroelectric Project, Water Conveyance System, Middle Fork Tule River, Springville, Tulare County, CA

  5. Remaining Sites Verification Package for the 126-B-3, 184-B Coal Pit Dumping Area, Waste Site Reclassification Form 2005-028

    SciTech Connect

    L. M. Dittmer

    2006-08-07

    The 126-B-3 waste site is the former coal storage pit for the 184-B Powerhouse. During demolition operations in the 1970s, the site was used for disposal of demolition debris from 100-B/C Area facilities. The site has been remediated by removing debris and contaminated soils. The results of verification sampling demonstrated that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also showed that residual contaminant concentrations are protective of groundwater and the Columbia River.

  6. 38. 8 sisters and powerhouse, pulverizer building for powerhouse, coal ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    38. 8 sisters and powerhouse, pulverizer building for powerhouse, coal conveyor, blast stoves, "A" furnace, stoves, "B" furnace, stoves, "C" furnace, bottle cars. Looking south - Rouge Steel Company, 3001 Miller Road, Dearborn, MI

  7. 2. OVERVIEW OF POWERHOUSE 8 COMPLEX. POWERHOUSE IS VISIBLE AT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. OVERVIEW OF POWERHOUSE 8 COMPLEX. POWERHOUSE IS VISIBLE AT UPPER PHOTO CENTER. BUILDING 105 IS PROMINENT TRANSVERSE GABLE ROOF AT LOWER PHOTO CENTER. BIG CREEK CURVES AROUND BUILDINGS AT LOWER PHOTO. VIEW TO WEST. - Big Creek Hydroelectric System, Powerhouse 8, Operator Cottage, Big Creek, Big Creek, Fresno County, CA

  8. 1. OVERVIEW OF POOLE POWERHOUSE COMPLEX SETTING. POOLE POWERHOUSE AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. OVERVIEW OF POOLE POWERHOUSE COMPLEX SETTING. POOLE POWERHOUSE AND TRIPLEX COTTAGE ARE VISIBLE AT PHOTO CENTER IN SMALL CLEARING AMONG TREES IN LEE VINING CREEK VALLEY. VIEW TO SOUTH EAST. - Lee Vining Creek Hydroelectric System, Triplex Cottage, Lee Vining Creek, Lee Vining, Mono County, CA

  9. 24. The 184B Power House under construction, viewed to the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    24. The 184-B Power House under construction, viewed to the northeast in March 1944. The sewer line exiting to the Columbia river was used mainly for effluents from back-washing the filter basins. A separate Process Sewer Line (out of the picture to the right) for cooling water leaving the pile went to the 107-B Retention Basin, and ultimately to the river. P-1881 - B Reactor, Richland, Benton County, WA

  10. 56. CROSS SECTION OF POWERHOUSE, PROJECT 1933, EXHIBIT F, SANTA ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    56. CROSS SECTION OF POWERHOUSE, PROJECT 1933, EXHIBIT F, SANTA ANA POWERHOUSE NO. 1. SCE drawing no. 5206856 (no date; FERC no. 1933-46). - Santa Ana River Hydroelectric System, SAR-1 Powerhouse, Redlands, San Bernardino County, CA

  11. 54. PLAN OF POWERHOUSE, PROJECT 1933, EXHIBIT F, SANTA ANA ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    54. PLAN OF POWERHOUSE, PROJECT 1933, EXHIBIT F, SANTA ANA POWERHOUSE NO. 1. SCE drawing no. 5206855 (no date; FERC no. 1933-45). - Santa Ana River Hydroelectric System, SAR-1 Powerhouse, Redlands, San Bernardino County, CA

  12. 2. EXTERIOR OF WEST SIDE OF POWERHOUSE BUILDING SHOWING BOTH ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. EXTERIOR OF WEST SIDE OF POWERHOUSE BUILDING SHOWING BOTH PENSTOCKS ENTERING SECOND FLOOR OF POWERHOUSE VIEW TO SOUTH. - Rush Creek Hydroelectric System, Powerhouse Exciters, Rush Creek, June Lake, Mono County, CA

  13. ALTERNATE VIEW OF PENSTOCK SHED, NORTH ELEVATION OF POWERHOUSE, TRANSFORMERS, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ALTERNATE VIEW OF PENSTOCK SHED, NORTH ELEVATION OF POWERHOUSE, TRANSFORMERS, AND HYDRAULIC PUMPHOUSE, INCLUDING HYDRAULIC OIL TANK - Folsom Powerhouse, Adjacent to American River, Folsom, Sacramento County, CA

  14. 19. ALTERNATE VIEW OF PENSTOCK SHED, NORTH ELEVATION OF POWERHOUSE, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. ALTERNATE VIEW OF PENSTOCK SHED, NORTH ELEVATION OF POWERHOUSE, TRANSFORMERS, AND HYDRAULIC PUMPHOUSE, INCLUDING HYDRAULIC OIL TANK - Folsom Powerhouse, Adjacent to American River, Folsom, Sacramento County, CA

  15. A History of the POWERHOUSE Evaluation.

    ERIC Educational Resources Information Center

    Educational Film Center, Springfield, VA.

    This report describes the evaluation activities associated with the development and production of POWERHOUSE, a motivational television series designed to help 8- to 12-year-old children take active, personal responsibility for their own health and well being. The evaluation of POWERHOUSE was divided into two major sections: the Writers' Notebook…

  16. Pythian Powerhouse and Laundry: Historic Building Survey

    DTIC Science & Technology

    2008-08-01

    ER D C/ CE R L SR -0 8 -1 4 Pythian Powerhouse and Laundry Historic Building Survey Sunny Stone, Adam Smith , and Sara Lask August...ERDC/CERL SR-08-14 August 2008 Pythian Powerhouse and Laundry Historic Building Survey Sunny Stone, Adam Smith , and Sara Lask Construction...Laboratory (CERL). The CERL Project Manager was Adam Smith . Dr. Christopher White is Chief, CN-C, and Dr. John Bandy is Chief, CN. The Deputy

  17. 2. ROSS POWERHOUSE: TRANSFORMER DECK, TAILRACE, AND BOATHOUSE AS SEEN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. ROSS POWERHOUSE: TRANSFORMER DECK, TAILRACE, AND BOATHOUSE AS SEEN FROM EAST END OF TRANSFORMER DECK, 1989. - Skagit Power Development, Ross Powerhouse, On Skagit River, 10.7 miles upstream from Newhalem, Newhalem, Whatcom County, WA

  18. 4. ANODIZED ALUMINUM WATER FOUNTAIN, DIABLO POWERHOUSE, CUSTOMMADE FOR THE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. ANODIZED ALUMINUM WATER FOUNTAIN, DIABLO POWERHOUSE, CUSTOM-MADE FOR THE VISITORS LOBBY, 1989. - Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 miles upstream from Newhalem, Newhalem, Whatcom County, WA

  19. 1. WEST FRONT OF HYDROELECTRIC POWERHOUSE WITH INTAKE STRUCTURE, CANAL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. WEST FRONT OF HYDROELECTRIC POWERHOUSE WITH INTAKE STRUCTURE, CANAL SPILLWAY AT LEFT CENTER, VIEW EAST - Dayville Mills Hydroelectric Facility, Powerhouse, North side of Route 101, .5 mile west of Route 395, Killingly Center, Windham County, CT

  20. 3. VIEW EAST, DETAIL WEST FRONT OF HYDROELECTRIC POWERHOUSE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. VIEW EAST, DETAIL WEST FRONT OF HYDROELECTRIC POWERHOUSE - Dayville Mills Hydroelectric Facility, Powerhouse, North side of Route 101, .5 mile west of Route 395, Killingly Center, Windham County, CT

  1. 6. POWERHOUSE, GENERATOR AND GOVERNOR LOCATED AT GROUND LEVEL LOOKING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. POWERHOUSE, GENERATOR AND GOVERNOR LOCATED AT GROUND LEVEL LOOKING NORTHWEST - Dayville Mills Hydroelectric Facility, Powerhouse, North side of Route 101, .5 mile west of Route 395, Killingly Center, Windham County, CT

  2. 19. LOWER OIL ROOM DIABLO POWERHOUSE: SHARPLES OIL CENTRIFUGE AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. LOWER OIL ROOM DIABLO POWERHOUSE: SHARPLES OIL CENTRIFUGE AND OIL TANK, 1989. - Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 miles upstream from Newhalem, Newhalem, Whatcom County, WA

  3. 13. WEST ELEVATION, POWERHOUSE, WITH FIGURES AND AUTOMOBILES Historic photograph ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. WEST ELEVATION, POWERHOUSE, WITH FIGURES AND AUTOMOBILES Historic photograph no. 1646, no date, held at Media Arts and Services Department, Pacific Gas & Electric Co., San Francisco, CA. - Centerville Hydroelectric System, Powerhouse, Butte Creek, Centerville, Butte County, CA

  4. 86. View of powerhouse and tailrace; this photograph was taken ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    86. View of powerhouse and tailrace; this photograph was taken while powerhouse was operating; looking northeast. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power & Light Company, White River Hydroelectric Project, 600 North River Avenue, Dieringer, Pierce County, WA

  5. 20. LOWER OIL ROOM DIABLO POWERHOUSE: LEROI AIR COMPRESSOR FOR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. LOWER OIL ROOM DIABLO POWERHOUSE: LEROI AIR COMPRESSOR FOR STATION SERVICE AND OIL AND AIR TANKS, 1989. - Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 miles upstream from Newhalem, Newhalem, Whatcom County, WA

  6. View of Irving Powerhouse. Looking across Fossil Creek (westsouthwest) ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of Irving Powerhouse. Looking across Fossil Creek (west-southwest) - Childs-Irving Hydroelectric Project, Irving System, Irving Powerhouse, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ

  7. 9. POWERHOUSE, LOWER LEVEL, LOOKING NORTHWEST, PRESSURE CASE WHICH CONTAINS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. POWERHOUSE, LOWER LEVEL, LOOKING NORTHWEST, PRESSURE CASE WHICH CONTAINS THE WATER TURBINE - Dayville Mills Hydroelectric Facility, Powerhouse, North side of Route 101, .5 mile west of Route 395, Killingly Center, Windham County, CT

  8. 5. ROSS POWERHOUSE: SAME CAMERA STATION AS ABOVE PHOTO BUT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. ROSS POWERHOUSE: SAME CAMERA STATION AS ABOVE PHOTO BUT LOOKING EAST. NOTE INFORMATION DISPLAY FOR TOURISTS AT FLOOR LEVEL, 1987. - Skagit Power Development, Ross Powerhouse, On Skagit River, 10.7 miles upstream from Newhalem, Newhalem, Whatcom County, WA

  9. Dam located to east of powerhouse, view from south. This ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Dam located to east of powerhouse, view from south. This dam holds back the waters of the Chattahoochee River to form the mill pond north of Riverdale Cotton Mill - Riverdale Cotton Mill, Powerhouse & Dam, Valley, Chambers County, AL

  10. 4. INTERIOR OF POWERHOUSE GENERATOR ROOM SHOWING GENERATOR UNITS AT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. INTERIOR OF POWERHOUSE GENERATOR ROOM SHOWING GENERATOR UNITS AT FOREGROUND RIGHT, GOVERNORS AND CONTROL VALVES AT LEFT, AND EXCITERS AT BACK LEFT. VIEW TO NORTH. - Rush Creek Hydroelectric System, Powerhouse Exciters, Rush Creek, June Lake, Mono County, CA

  11. 6. VIEW FROM THE ROOF OF GORGE POWERHOUSE LOOKING EAST ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. VIEW FROM THE ROOF OF GORGE POWERHOUSE LOOKING EAST TO THE FORMER GRAVITY OIL STORAGE BUILDING, 1989. - Skagit Power Development, Gorge Powerhouse, On Skagit River, 0.4 mile upstream from Newhalem, Newhalem, Whatcom County, WA

  12. 5. EAST ELEVATION, WITH PENSTOCK ENTERING POWERHOUSE. VIEW TO WESTSOUTHWEST. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. EAST ELEVATION, WITH PENSTOCK ENTERING POWERHOUSE. VIEW TO WEST-SOUTHWEST. - Santa Ana River Hydroelectric System, SAR-3 Powerhouse, San Bernardino National Forest, Redlands, San Bernardino County, CA

  13. 9. GENERATOR, AND CRANE IN NORTHWEST CORNER OF POWERHOUSE. VIEW ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. GENERATOR, AND CRANE IN NORTHWEST CORNER OF POWERHOUSE. VIEW TO SOUTHWEST. - Santa Ana River Hydroelectric System, SAR-3 Powerhouse, San Bernardino National Forest, Redlands, San Bernardino County, CA

  14. 6. POWERHOUSE INTERIOR SHOWING EXCITER No. 1. HANDCONTROLLED GATE VALVE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. POWERHOUSE INTERIOR SHOWING EXCITER No. 1. HAND-CONTROLLED GATE VALVE SHOWN ON NOZZLE TO PELTON-DOBLE IMPULSE WHEEL. VIEW TO NORTHEAST. - Rush Creek Hydroelectric System, Powerhouse Exciters, Rush Creek, June Lake, Mono County, CA

  15. 12. POWERHOUSE INTERIOR SHOWING EXCITER No. 2 SMALL PELTONDOBLE IMPULSE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. POWERHOUSE INTERIOR SHOWING EXCITER No. 2 SMALL PELTON-DOBLE IMPULSE WHEEL, HAND-CONTROLLED GATE VALVE, AND NOZZLE. VIEW TO SOUTHWEST. - Rush Creek Hydroelectric System, Powerhouse Exciters, Rush Creek, June Lake, Mono County, CA

  16. View of powerhouse and dam from third floor of original ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of powerhouse and dam from third floor of original section of Langdale Cotton Mill, looking northeast - Langdale Cotton Mill, Powerhouse & Dam, 5910 Nineteenth Avenue, Valley, Chambers County, AL

  17. 33. DETAIL INTERIOR VIEW OF LEVEL +55 IN POWERHOUSE #1, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    33. DETAIL INTERIOR VIEW OF LEVEL +55 IN POWERHOUSE #1, SHOWING TURBINE/GENERATOR CONTROL PANEL FOR TURBINE/GENERATOR UNIT NO 1. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  18. 20. ROSS POWERHOUSE: BUTTERFLY VALVE AS SEEN FROM INSIDE THE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. ROSS POWERHOUSE: BUTTERFLY VALVE AS SEEN FROM INSIDE THE SCROLL CASE, 1987. - Skagit Power Development, Ross Powerhouse, On Skagit River, 10.7 miles upstream from Newhalem, Newhalem, Whatcom County, WA

  19. 18. ROSS POWERHOUSE: BUTTERFLY VALVE FROM BELOW AND SCROLL CASE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. ROSS POWERHOUSE: BUTTERFLY VALVE FROM BELOW AND SCROLL CASE DRAIN. TAG INDICATES THE SCROLL CASE DRAIN WAS OPEN, 1989. - Skagit Power Development, Ross Powerhouse, On Skagit River, 10.7 miles upstream from Newhalem, Newhalem, Whatcom County, WA

  20. 8. DETAIL: GENERATOR FLOOR DIABLO POWERHOUSE SHOWING BUTTERFLY VALVE CONTROL, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. DETAIL: GENERATOR FLOOR DIABLO POWERHOUSE SHOWING BUTTERFLY VALVE CONTROL, MOSAIC TILE FLOOR, AS SEEN FROM VISITORS GALLERY, 1989. - Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 miles upstream from Newhalem, Newhalem, Whatcom County, WA

  1. 9. BUTTERFLY VALVE CONTROL DIABLO POWERHOUSE. BUTTERFLY VALVES WERE MANUFACTURED ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. BUTTERFLY VALVE CONTROL DIABLO POWERHOUSE. BUTTERFLY VALVES WERE MANUFACTURED BY THE PELTON WATER WHEEL COMPANY IN 1931, 1989. - Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 miles upstream from Newhalem, Newhalem, Whatcom County, WA

  2. 13. POWERHOUSE INTERIOR, DETAIL OF EXCITER No. 2 GENERAL ELECTRIC ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. POWERHOUSE INTERIOR, DETAIL OF EXCITER No. 2 GENERAL ELECTRIC INDUCTION MOTOR NAMEPLATE. VIEW TO EAST. - Rush Creek Hydroelectric System, Powerhouse Exciters, Rush Creek, June Lake, Mono County, CA

  3. 14. POWERHOUSE INTERIOR, EXCITER No. 2 SHOWING GENERAL ELECTRIC INDUCTION ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. POWERHOUSE INTERIOR, EXCITER No. 2 SHOWING GENERAL ELECTRIC INDUCTION MOTOR IN SERIES BETWEEN PELTON-DOBLE IMPULSE WHEEL AND GENERAL ELECTRIC GENERATOR. VIEW TO EAST. - Rush Creek Hydroelectric System, Powerhouse Exciters, Rush Creek, June Lake, Mono County, CA

  4. 16. AIR CIRCUIT BREAKER GORGE POWERHOUSE. THIS WAS A REPLACEMENT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. AIR CIRCUIT BREAKER GORGE POWERHOUSE. THIS WAS A REPLACEMENT ACB AND WAS STILL PACKED WITH WOODEN BLOCKS FOR SHIPPING, 1989. - Skagit Power Development, Gorge Powerhouse, On Skagit River, 0.4 mile upstream from Newhalem, Newhalem, Whatcom County, WA

  5. 15. POWERHOUSE INTERIOR SHOWING EXCITER No. 2 WITH EXCITER No. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. POWERHOUSE INTERIOR SHOWING EXCITER No. 2 WITH EXCITER No. 1 BEHIND. OVERHEAD CRANE DANGLES AT TOP OF PHOTO. VIEW TO NORTHEAST. - Rush Creek Hydroelectric System, Powerhouse Exciters, Rush Creek, June Lake, Mono County, CA

  6. 11. POWERHOUSE INTERIOR, DETAIL OF EXCITER No. 2 GENERAL ELECTRIC ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. POWERHOUSE INTERIOR, DETAIL OF EXCITER No. 2 GENERAL ELECTRIC GENERATOR SHOWING COPPER COMMUTATOR AND CARBON BRUSHES. VIEW TO NORTHEAST. - Rush Creek Hydroelectric System, Powerhouse Exciters, Rush Creek, June Lake, Mono County, CA

  7. 5. POWERHOUSE INTERIOR SHOWING EXCITER No. 1. SMALL PELTONDOBLE IMPULSE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. POWERHOUSE INTERIOR SHOWING EXCITER No. 1. SMALL PELTON-DOBLE IMPULSE WHEEL IN FOREGROUND. VIEW TO NORTHWEST. - Rush Creek Hydroelectric System, Powerhouse Exciters, Rush Creek, June Lake, Mono County, CA

  8. 10. POWERHOUSE INTERIOR, DETAIL OF EXCITER No. 2 GENERAL ELECTRIC ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. POWERHOUSE INTERIOR, DETAIL OF EXCITER No. 2 GENERAL ELECTRIC GENERATOR SHOWING CABLING FROM ARMATURE TO COMMUTATOR. VIEW TO NORTHEAST. - Rush Creek Hydroelectric System, Powerhouse Exciters, Rush Creek, June Lake, Mono County, CA

  9. 32. DIABLO POWERHOUSE: DETAIL CONTROL ROOM: DIFFERENTIAL OVERCURRENTS AND TRIPPING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    32. DIABLO POWERHOUSE: DETAIL CONTROL ROOM: DIFFERENTIAL OVERCURRENTS AND TRIPPING RELAYS FOR HOUSE UNITS, 1989. - Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 miles upstream from Newhalem, Newhalem, Whatcom County, WA

  10. 12. ROSS POWERHOUSE: DETAIL OF GAUGES AND PUMPS IN UNIT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. ROSS POWERHOUSE: DETAIL OF GAUGES AND PUMPS IN UNIT 41 TURBINE PIT, 1989. - Skagit Power Development, Ross Powerhouse, On Skagit River, 10.7 miles upstream from Newhalem, Newhalem, Whatcom County, WA

  11. 35. EAST FRONT OF POWERHOUSE AND CAR BARN: East front ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    35. EAST FRONT OF POWERHOUSE AND CAR BARN: East front of powerhouse and car barn. 'Annex' is right end of building. - San Francisco Cable Railway, Washington & Mason Streets, San Francisco, San Francisco County, CA

  12. 13. INTERIOR OF KERN RIVER No. 1 POWERHOUSE BUILDING SHOWING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. INTERIOR OF KERN RIVER No. 1 POWERHOUSE BUILDING SHOWING EXCITER No. 1 GENERATOR COMMUTATOR, CABLING, AND ARMATURE BETWEEN WATERWHEEL AND FLYWHEEL. VIEW TO SOUTH. - Kern County No. 1 Hydroelectric System, Powerhouse Exciters, Kern River Canyon, Bakersfield, Kern County, CA

  13. 1921 POWERHOUSE, INTERIOR, UNIT #3 GENERATOR AND FLYWHEEL, VERTICAL VIEW; ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1921 POWERHOUSE, INTERIOR, UNIT #3 GENERATOR AND FLYWHEEL, VERTICAL VIEW; FACING WEST-NORTHWEST - Shoshone Falls Hydroelectric Project, 1921 Powerhouse, North Bank of Snake River, Tipperary Corner, Jerome County, ID

  14. View of north wall (electrical panel), interior of Childs Powerhouse. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of north wall (electrical panel), interior of Childs Powerhouse. Looking east - Childs-Irving Hydroelectric Project, Childs System, Childs Powerhouse, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ

  15. View of Childs Powerhouse electrical panel and operator station. In ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of Childs Powerhouse electrical panel and operator station. In forground generator #2 and its exciter are visible. Looking north - Childs-Irving Hydroelectric Project, Childs System, Childs Powerhouse, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ

  16. View of west end of Childs Powerhouse, including transformer station ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of west end of Childs Powerhouse, including transformer station and associated sheds. Looking downstream (east) - Childs-Irving Hydroelectric Project, Childs System, Childs Powerhouse, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ

  17. 8. INTERIOR GORGE POWERHOUSE LOOKING SOUTH AT UNITS 23, 22, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. INTERIOR GORGE POWERHOUSE LOOKING SOUTH AT UNITS 23, 22, AND 21 FROM THE TOP OF UNIT 24. THE SHAW BRIDGE CRANE IS AT THE TOP REAR OF THE POWERHOUSE. THE UPPER SET OF WINDOWS TO THE LEFT ARE FOR THE VISITORS' GALLERY; THE LOWER SET ARE THE POWERHOUSE CONTROL ROOM, 1989. - Skagit Power Development, Gorge Powerhouse, On Skagit River, 0.4 mile upstream from Newhalem, Newhalem, Whatcom County, WA

  18. 7. POWERHOUSE, FOREGROUND ON CEILING EXCITER FLATBELT PULLEYS, BACK RIGHT, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. POWERHOUSE, FOREGROUND ON CEILING EXCITER FLATBELT PULLEYS, BACK RIGHT, WOODEN PERSONAL FACILITY LOCATED IN POWERHOUSE LOWER LEVEL LOOKING SOUTH - Dayville Mills Hydroelectric Facility, Powerhouse, North side of Route 101, .5 mile west of Route 395, Killingly Center, Windham County, CT

  19. 5. POWERHOUSE, GROUND LEVEL, LOOKING SOUTHEAST GENERATOR, GOVERNOR, EXCITER AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. POWERHOUSE, GROUND LEVEL, LOOKING SOUTHEAST GENERATOR, GOVERNOR, EXCITER AND KILOWATT-HOUR RECORDER LOCATED IN POWERHOUSE AT GROUND LEVEL LOOKING SOUTHEAST - Dayville Mills Hydroelectric Facility, Powerhouse, North side of Route 101, .5 mile west of Route 395, Killingly Center, Windham County, CT

  20. 4. NORTH EXTERIOR SIDE OF KERN RIVER No. 1 POWERHOUSE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. NORTH EXTERIOR SIDE OF KERN RIVER No. 1 POWERHOUSE BUILDING SHOWING TAILRACES FOR (LEFT TO RIGHT IN PHOTO) GENERATOR UNITS Nos. 4 AND 3, EXCITER No. 1, AND GENERATOR UNITS Nos. 2 AND 1. POWERHOUSE BUILDING NORTH EXIT DOOR IS IN CENTER OF WALL. VIEW TO SOUTHWEST. - Kern County No. 1 Hydroelectric System, Powerhouse Exciters, Kern River Canyon, Bakersfield, Kern County, CA

  1. 39. DIABLO POWERHOUSE: GRAVITY LUBRICATING OIL TANKS. THESE TANKS ARE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    39. DIABLO POWERHOUSE: GRAVITY LUBRICATING OIL TANKS. THESE TANKS ARE LOCATED AT ROOF LEVEL AT THE NORTHEAST REAR CORNER OF DIABLO POWERHOUSE, 1989. - Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 miles upstream from Newhalem, Newhalem, Whatcom County, WA

  2. 21. DIABLO POWERHOUSE: LOOKING AT THE TRUNION FOR THE BUTTERFLY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    21. DIABLO POWERHOUSE: LOOKING AT THE TRUNION FOR THE BUTTERFLY VALVE AND DRAIN FOR SCROLL CASE FOR UNIT 32. THESE ARE LOCATED ON THE SAME LEVEL IN THE POWERHOUSE AS THE LOWER OIL ROOM, 1989. - Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 miles upstream from Newhalem, Newhalem, Whatcom County, WA

  3. 1. EXTERIOR OVERVIEW OF SOUTH END OF RUSH CREEK POWERHOUSE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. EXTERIOR OVERVIEW OF SOUTH END OF RUSH CREEK POWERHOUSE RESIDENTIAL COMPLEX SHOWING THE RUSH CREEK POWERHOUSE AT PHOTO RIGHT (TAILRACE IN FOREGROUND), BUILDING 106 NEXT TO THE POWERHOUSE AT PHOTO LEFT CENTER, AND BUILDING 103 AT UPPER PHOTO LEFT ABOVE AND BEHIND BUILDING 106. VIEW TO SOUTH. - Rush Creek Hydroelectric System, Worker Cottage, Rush Creek, June Lake, Mono County, CA

  4. 2. OVERVIEW OF TRIPLEX COTTAGE IN POOLE POWERHOUSE SETTING. TRIPLEX ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. OVERVIEW OF TRIPLEX COTTAGE IN POOLE POWERHOUSE SETTING. TRIPLEX COTTAGE IS VISIBLE AT PHOTO CENTER LEFT. POOLE POWERHOUSE IS ADJACENT TRIPLEX COTTAGE AT PHOTO CENTER RIGHT. SWITCHRACKS ARE VISIBLE ADJACENT TO POWERHOUSE BUILDING. VIEW TO SOUTH. - Lee Vining Creek Hydroelectric System, Triplex Cottage, Lee Vining Creek, Lee Vining, Mono County, CA

  5. State Waste Discharge Permit application: 200-W Powerhouse Ash Pit

    SciTech Connect

    Atencio, B.P.

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations; the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. This document constitutes the State Waste Discharge Permit application for the 200-W Powerhouse Ash Pit. The 200-W Powerhouse Ash Waste Water discharges to the 200-W Powerhouse Ash Pit via dedicated pipelines. The 200-W Powerhouse Ash Waste Water is the only discharge to the 200-W Powerhouse Ash Pit. The 200-W Powerhouse is a steam generation facility consisting of a coal-handling and preparation section and boilers.

  6. 15. OVERVIEW OF TULE RIVER POWERHOUSE FROM FLUME SECTION JUST ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. OVERVIEW OF TULE RIVER POWERHOUSE FROM FLUME SECTION JUST SOUTHEAST OF FOREBAY SHOWING BYPASSED SEGMENT OF OLD HIGHWAY 190 IN FRONT OF POWERHOUSE A PHOTO RIGHT CENTER. TAILRACE FROM POWERHOUSE DISCHARGES PROJECT WATER BACK INTO TULE RIVER MIDDLE FORK JUST OUT OF VIEW AT EXTREME LEFT OF PHOTO. VIEW TO SOUTHWEST. - Tule River Hydroelectric Project, Water Conveyance System, Middle Fork Tule River, Springville, Tulare County, CA

  7. 1. EXTERIOR OVERVIEW OF SOUTH END OF RUSH CREEK POWERHOUSE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. EXTERIOR OVERVIEW OF SOUTH END OF RUSH CREEK POWERHOUSE RESIDENTIAL COMPLEX SHOWING THE RUSH CREEK POWERHOUSE AT PHOTO RIGHT, BUILDING 106 NEXT TO THE POWERHOUSE AT PHOTO CENTER, BUILDING 103 AT UPPER PHOTO LEFT, AND BUILDING 104 ABOVE BUILDING 106 PARTIALLY OBSCURED BEHIND TREE AT UPPER PHOTO CENTER. VIEW TO SOUTH. - Rush Creek Hydroelectric System, Worker Cottage, Rush Creek, June Lake, Mono County, CA

  8. 83. OVERVIEW OF PARTIALLY COMPLETED POWERHOUSE WITH TWO UNITS IN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    83. OVERVIEW OF PARTIALLY COMPLETED POWERHOUSE WITH TWO UNITS IN OPERATION, LOOKING UPSTREAM, Print No. 274, June 1904 - Electron Hydroelectric Project, Along Puyallup River, Electron, Pierce County, WA

  9. 9. North Plant, View of Canopied Loading Dock with Powerhouse ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. North Plant, View of Canopied Loading Dock with Powerhouse to Left, Looking Northwest - Atwater Kent Manufacturing Company, North Plant, 5000 Wissahickon Avenue, Philadelphia, Philadelphia County, PA

  10. View of transformer platform from Powerhouse roof showing oil tank ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of transformer platform from Powerhouse roof showing oil tank at original step-up transformer (center of foreground) and steel switchback (background), view to north-northeast - Morony Hydroelectric Facility, Dam and Powerhouse, Morony Dam Road, Great Falls, Cascade County, MT

  11. 10. UNITS 35 AND 36 ('HOUSE UNITS') DIABLO POWERHOUSE AS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. UNITS 35 AND 36 ('HOUSE UNITS') DIABLO POWERHOUSE AS VIEWED FROM GENERATOR FLOOR LOOKING SOUTH. THE BRIDGE CRANE TO THE TOP LEFT WAS THE HIGHEST RATED CAPACITY BRIDGE CRANE IN THE WORLD WHEN IT WAS ORDERED IN 1930, 1989. - Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 miles upstream from Newhalem, Newhalem, Whatcom County, WA

  12. 2. CONTEXTUAL VIEW OF THE POST FALLS POWERHOUSE, WITH THE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. CONTEXTUAL VIEW OF THE POST FALLS POWERHOUSE, WITH THE MODERN SUBSTATION AND OLD SWITCHING BUILDING IN THE LEFT FOREGROUND AND THE POWER PLANT IN THE RIGHT FOREGROUND, LOOKING SOUTH. - Washington Water Power Company Post Falls Power Plant, Middle Channel Powerhouse & Dam, West of intersection of Spokane & Fourth Streets, Post Falls, Kootenai County, ID

  13. 1. CONTEXTUAL VIEW OF THE POST FALLS POWERHOUSE LOOKING DOWNSTREAM. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. CONTEXTUAL VIEW OF THE POST FALLS POWERHOUSE LOOKING DOWNSTREAM. POWER PLANT AND INTAKE GATES ARE IN THE LEFT FOREGROUND, AND THE ATTACHED 'OLD SWITCHING BUILDING' (NOW ABANDONED) IS IN THE RIGHT BACKGROUND, LOOKING NORTHWEST. - Washington Water Power Company Post Falls Power Plant, Middle Channel Powerhouse & Dam, West of intersection of Spokane & Fourth Streets, Post Falls, Kootenai County, ID

  14. 2. VIEW SOUTH, NORTH SIDE OF HYDROELECTRIC POWERHOUSE AT LEFT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. VIEW SOUTH, NORTH SIDE OF HYDROELECTRIC POWERHOUSE AT LEFT WITH BRIDGE OVER CANAL SPILLWAY IN FOREGROUND AND MILL COMPLEX IN BACKGROUND - Dayville Mills Hydroelectric Facility, Powerhouse, North side of Route 101, .5 mile west of Route 395, Killingly Center, Windham County, CT

  15. 28. SOUTHEAST CORNER OF POWERHOUSE DURING RECONSTRUCTION: Photocopy of July ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    28. SOUTHEAST CORNER OF POWERHOUSE DURING RECONSTRUCTION: Photocopy of July 1907 photograph taken during reconstruction of the powerhouse and car barn. View of the southeast corner of the building. The steam indicates that some of the building's cable lines are in operation. - San Francisco Cable Railway, Washington & Mason Streets, San Francisco, San Francisco County, CA

  16. 85. General view of powerhouse from tailrace; this photograph was ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    85. General view of powerhouse from tailrace; this photograph was taken while operations at the powerhouse were temporarily halted; looking east. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power & Light Company, White River Hydroelectric Project, 600 North River Avenue, Dieringer, Pierce County, WA

  17. 18. SHEAR PIN, UNIT 24 GORGE POWERHOUSE. THE WICKET GATES ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. SHEAR PIN, UNIT 24 GORGE POWERHOUSE. THE WICKET GATES ON THE TURBINE ARE EACH EQUIPPED WITH A SHEAR PIN AND OIL PRESSURE GAUGE. IF A GATE JAMS, THE PIN SMEARS AND THE CHANGE IN OIL PRESSURE TRIGGERS AN ALARM, 1989. - Skagit Power Development, Gorge Powerhouse, On Skagit River, 0.4 mile upstream from Newhalem, Newhalem, Whatcom County, WA

  18. 27. DIABLO POWERHOUSE UPPER OIL ROOM: OBSOLETE WESTINGHOUSE DIELECTRIC OIL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    27. DIABLO POWERHOUSE UPPER OIL ROOM: OBSOLETE WESTINGHOUSE DIELECTRIC OIL TESTING SET. OIL IS USED AS AN INSULATOR IN TRANSFORMERS AND ITS CONDUCTIVITY USED TO BE TESTED USING EQUIPMENT SUCH AS THIS, 1989. - Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 miles upstream from Newhalem, Newhalem, Whatcom County, WA

  19. 1. EXTERIOR OVERVIEW OF NORTH END OF RUSH CREEK POWERHOUSE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. EXTERIOR OVERVIEW OF NORTH END OF RUSH CREEK POWERHOUSE RESIDENTIAL COMPLEX SHOWING BUILDING 108 AT PHOTO RIGHT AND BUILDING 105 AT PHOTO CENTER BEHIND TREE. RUSH CREEK POWERHOUSE IS PARTIALLY VISIBLE AT EXTREME PHOTO LEFT). VIEW TO WEST. - Rush Creek Hydroelectric System, Clubhouse Cottage, Rush Creek, June Lake, Mono County, CA

  20. 4. VIEW NORTHEAST FROM ELEVATOR TOWER BRIDGE OF NEW POWERHOUSE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. VIEW NORTHEAST FROM ELEVATOR TOWER BRIDGE OF NEW POWERHOUSE ROOF WITH FRAMEWORK FOR WIRES (RIGHT), AND PENSTOCKS FROM TOP OF GORGE (LEFT) - Trenton Falls Hydroelectric Station, Powerhouse & Substation, On west bank of West Canada Creek, along Trenton Falls Road, 1.25 miles north of New York Route 28, Trenton Falls, Oneida County, NY

  1. 8. POWERHOUSE INTERIOR SHOWING EXCITER No. 1 IN FOREGROUND, EXCITER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. POWERHOUSE INTERIOR SHOWING EXCITER No. 1 IN FOREGROUND, EXCITER No. 2., AND GENERATOR UNITS BEHIND EXCITER No. 2 IN BACKGROUND. EXCITER No. 1 GENERATOR HAS A COVER OVER TOP HALF OF COMMUTATOR ELEMENT. VIEW TO NORTHWEST. - Rush Creek Hydroelectric System, Powerhouse Exciters, Rush Creek, June Lake, Mono County, CA

  2. 33. EAST FRONT AND SOUTH SIDE OF POWERHOUSE 1965: ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    33. EAST FRONT AND SOUTH SIDE OF POWERHOUSE - 1965: Photocopy of July 1965 photograph showing south side and east front of powerhouse and car barn. Note addition of the decorative canopy at the corner of the building. At this date the structure displayed a coat of light green paint. - San Francisco Cable Railway, Washington & Mason Streets, San Francisco, San Francisco County, CA

  3. 18. LOWER OIL ROOM DIABLO POWERHOUSE: GRAVITY OIL PUMPS POWERED ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. LOWER OIL ROOM DIABLO POWERHOUSE: GRAVITY OIL PUMPS POWERED BY LINCOLN AC MOTORS ON THE RIGHT AND TURBINE AIR DRY APPARATUS ON THE LEFT, 1989. - Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 miles upstream from Newhalem, Newhalem, Whatcom County, WA

  4. 89. View of west and south facades of powerhouse, and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    89. View of west and south facades of powerhouse, and abandoned lightning arrester houses on hillside above powerhouse; looking north. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power & Light Company, White River Hydroelectric Project, 600 North River Avenue, Dieringer, Pierce County, WA

  5. 90. View of east facade of powerhouse, and abandoned lightning ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    90. View of east facade of powerhouse, and abandoned lightning arrester houses on hillside above powerhouse; looking west. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power & Light Company, White River Hydroelectric Project, 600 North River Avenue, Dieringer, Pierce County, WA

  6. 7. OVERVIEW OF BRIDGE AND ITS RELATIONSHIP TO POWERHOUSE (AT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. OVERVIEW OF BRIDGE AND ITS RELATIONSHIP TO POWERHOUSE (AT LEFT) AND ASSOCIATED MAINTENANCE OUTBUILDINGS (CENTER) AND POWERHOUSE MAINTENANCE WORKERS' HOUSES (UPPER CENTER), LOOKING SOUTH. 65mm lens - Tule River Hydroelectric Complex, Tule River Bridge, Spanning North Fork of Middle Fork of Tule River, Springville, Tulare County, CA

  7. 7. GENERAL VIEW LOOKING NORTH, SHOWING UPSTREAM SIDE OF POWERHOUSE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. GENERAL VIEW LOOKING NORTH, SHOWING UPSTREAM SIDE OF POWERHOUSE #1; ADMINISTRATIVE OFFICES ARE VISIBLE AT CENTER/LEFT WITH ELEVATOR TOWER IN LEFT BACKGROUND; GANTRY CRANE IS VISIBLE IN FAR RIGHT BACKGROUND. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  8. 17. ROSS POWERHOUSE: BUTTERFLY VALVE CONTROLS FOR UNIT 43. THE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. ROSS POWERHOUSE: BUTTERFLY VALVE CONTROLS FOR UNIT 43. THE BUTTERFLY VALVE LOCK INDICATES THE BUTTERFLY VALVE IS CLOSED AS UNIT 43 WAS SHUT DOWN FOR REPAIRS, 1989. - Skagit Power Development, Ross Powerhouse, On Skagit River, 10.7 miles upstream from Newhalem, Newhalem, Whatcom County, WA

  9. 51. GENERAL INTERIOR VIEW OF LEVEL 10 IN POWERHOUSE #1; ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    51. GENERAL INTERIOR VIEW OF LEVEL -10 IN POWERHOUSE #1; COOLING WATER PUMPS ARE ON RIGHT AND THE FIRE PROTECTION PUMP IS IN THE CENTER/LEFT BACKGROUND. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  10. 7. INTERIOR OF KERN RIVER No. 1 POWERHOUSE BUILDING SHOWING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. INTERIOR OF KERN RIVER No. 1 POWERHOUSE BUILDING SHOWING EXCITER No 1. EXCITER No. 1 IMPULSE WHEEL NOZZLE SHUTOFF VALVE AND LOMBARD GOVERNOR IN FOREGROUND. NORTH EXIT DOOR VISIBLE IN BACKGROUND. VIEW TO NORTH. - Kern County No. 1 Hydroelectric System, Powerhouse Exciters, Kern River Canyon, Bakersfield, Kern County, CA

  11. 11. INTERIOR OF KERN RIVER No. 1 POWERHOUSE BUILDING SHOWING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. INTERIOR OF KERN RIVER No. 1 POWERHOUSE BUILDING SHOWING EXCITER No. 1. LOMBARD GOVERNOR NOZZLE-DEFLECTOR CONNECTION IS VISIBLE IN FRONT OF ALLIS-CHALMERS WATERWHEEL COVER. VIEW TO NORTHEAST. - Kern County No. 1 Hydroelectric System, Powerhouse Exciters, Kern River Canyon, Bakersfield, Kern County, CA

  12. 26. DETAIL TO NORTH OF BUS STRUCTURE. NEW POWERHOUSE SECOND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    26. DETAIL TO NORTH OF BUS STRUCTURE. NEW POWERHOUSE SECOND FLOOR, WITH OIL CIRCUIT BREAKER UNITS (LEFT) AND TANK LIFTER (CENTER) - Trenton Falls Hydroelectric Station, Powerhouse & Substation, On west bank of West Canada Creek, along Trenton Falls Road, 1.25 miles north of New York Route 28, Trenton Falls, Oneida County, NY

  13. 1. EXTERIOR OVERVIEW OF NORTH END OF RUSH CREEK POWERHOUSE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. EXTERIOR OVERVIEW OF NORTH END OF RUSH CREEK POWERHOUSE RESIDENTIAL COMPLEX SHOWING BUILDING 108 AT PHOTO RIGHT AND BUILDING 105 AT PHOTO CENTER BEHIND SWITCHRACKS AND TREE. POWERHOUSE IS AT EXTREME PHOTO LEFT. VIEW TO WEST. - Rush Creek Hydroelectric System, Worker Cottage, Rush Creek, June Lake, Mono County, CA

  14. 3. NORTH SIDE OF POWERHOUSE, WITH PENSTOCK BLOCK AT RIGHT, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. NORTH SIDE OF POWERHOUSE, WITH PENSTOCK BLOCK AT RIGHT, SPILLWAY GATE HOISTS (MI-98-B) IN FOREGROUND, AND TAILRACE AT UPPER LEFT. VIEW TO EAST. - Cooke Hydroelectric Plant, Powerhouse, Cook Dam Road at Au Sable River, Oscoda, Iosco County, MI

  15. 22. TURBINE PIT AREA GORGE POWERHOUSE SHOWING RELIEF VALVE FOR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    22. TURBINE PIT AREA GORGE POWERHOUSE SHOWING RELIEF VALVE FOR UNIT 23 IN FOREGROUND AND GOVERNOR OIL TANKS AND PUMPS IN THE LEFT REAR, 1989. - Skagit Power Development, Gorge Powerhouse, On Skagit River, 0.4 mile upstream from Newhalem, Newhalem, Whatcom County, WA

  16. 23. VIEW TO NORTH OF UNITS 57, NEW POWERHOUSE GENERATOR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    23. VIEW TO NORTH OF UNITS 5-7, NEW POWERHOUSE GENERATOR FLOOR; HYBRID LOMBARD-WOODWARD GOVERNOR FOR UNIT 5 AT LOWER LEFT; GOVERNOR OIL PUMP AT LEFT CENTER - Trenton Falls Hydroelectric Station, Powerhouse & Substation, On west bank of West Canada Creek, along Trenton Falls Road, 1.25 miles north of New York Route 28, Trenton Falls, Oneida County, NY

  17. 9. INTERIOR OF KERN RIVER No. 1 POWERHOUSE BUILDING SHOWING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. INTERIOR OF KERN RIVER No. 1 POWERHOUSE BUILDING SHOWING EXCITER No 2. Ca. 1930 GENERAL ELECTRIC ALTERNATING CURRENT MOTOR REPLACEMENT FOR ALLIS-CHALMERS IMPULSE WHEEL IS VISIBLE ON RIGHT ALONG WITH COUPLING TO EXCITER SHAFT. VIEW TO NORTHWEST. - Kern County No. 1 Hydroelectric System, Powerhouse Exciters, Kern River Canyon, Bakersfield, Kern County, CA

  18. 8. POWERHOUSE, LOWER LEVEL, LEFT, GOVERNOR DRIVE MOTOR WITH BELT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. POWERHOUSE, LOWER LEVEL, LEFT, GOVERNOR DRIVE MOTOR WITH BELT ON RIGHT, HYDRAULIC PUMP WITH RESERVOIR TANK, STEAM HEAT PIPES ON BACK WALL LOOKING NORTHEAST - Dayville Mills Hydroelectric Facility, Powerhouse, North side of Route 101, .5 mile west of Route 395, Killingly Center, Windham County, CT

  19. 37. WEST REAR OF POWERHOUSE AND CAR BARN: West rear ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. WEST REAR OF POWERHOUSE AND CAR BARN: West rear of powerhouse and car barn, showing the turntable and tracks used to move cars in and out of the building's repair and storage area. - San Francisco Cable Railway, Washington & Mason Streets, San Francisco, San Francisco County, CA

  20. View looking out of the Irving Powerhouse showing the exiting ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View looking out of the Irving Powerhouse showing the exiting water flowing south into the inlet of the Childs System. Looking south - Childs-Irving Hydroelectric Project, Irving System, Irving Powerhouse, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ

  1. 33. DIABLO POWERHOUSE: VOLTAGE REGULATOR FOR SPARE EXCITER. ORIGINAL EQUIPMENT, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    33. DIABLO POWERHOUSE: VOLTAGE REGULATOR FOR SPARE EXCITER. ORIGINAL EQUIPMENT, BALANCE BEAM TYPE REGULATOR WHICH IS POSSIBLY ONE OF THE LAST OF ITS TYPE IN WORKING SERVICE IN THE COUNTRY, 1989. - Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 miles upstream from Newhalem, Newhalem, Whatcom County, WA

  2. State Waste Discharge Permit application: 200-E Powerhouse Ash Pit

    SciTech Connect

    Atencio, B.P.

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations, the US Department and Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. This document constitutes the State Waste Discharge Permit application for the 200-E Powerhouse Ash Pit. The 200-E Powerhouse Ash Waste Water discharges to the 200-E Powerhouse Ash Pit via dedicated pipelines. The 200-E Ash Waste Water is the only discharge to the 200-E Powerhouse Ash Pit. The 200-E Powerhouse is a steam generation facility consisting of a coal-handling and preparation section and boilers.

  3. Coal fired powerhouse wastewater pressure filtration

    SciTech Connect

    Martin, H.L.; Diener, G.A.

    1994-05-01

    The Savannah River Site`s permit for construction of an industrial wastewater treatment facility to remove solids from the boiler blow-down and wet ash scrubber effluent of the A-Area coal fired powerhouse was rejected. Conventional clarification technology would not remove arsenic from the combined effluent sufficient to achieve human health criteria in the small receiving surface stream. Treatability studies demonstrated that an existing facility, which will no longer be needed for metal finishing wastewater, can very efficiently process the powerhouse wastewater to less than 35 {mu}g/L arsenic. Use of cationic and anionic polymers to flocculate both the wastewater and filter aid solids formed a ``bridged cake`` with exceptionally low resistance to flow. This will double the capacity of the Oberlin pressure filters with the Tyvek T-980 sub micron filter media. The affects of high sheer agitation and high temperature in the raw wastewater on the filtration process were also studied and adequate controls were demonstrated.

  4. VIEW LOOKING NORTHEAST SHOWING A CORNER DETAIL OF THE POWERHOUSE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW LOOKING NORTHEAST SHOWING A CORNER DETAIL OF THE POWERHOUSE AND THE SOUTHERN SECTION OF THE DAM. - Wilson Dam & Hydroelectric Plant, Spanning Tennessee River at Wilson Dam Road (Route 133), Muscle Shoals, Colbert County, AL

  5. Interior of Right Powerhouse, looking northeast, showing shaft from Francis ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Interior of Right Powerhouse, looking northeast, showing shaft from Francis turbine (below) extending to the generator (above). This is unit G-10. - Columbia Basin Project, Grand Coulee Dam Powerplant Complex, Grand Coulee, Grant County, WA

  6. Interior of Third Powerhouse, looking south, showing the work on ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Interior of Third Powerhouse, looking south, showing the work on the new stator which is being fabricated by Siemens. - Columbia Basin Project, Grand Coulee Dam Powerplant Complex, Grand Coulee, Grant County, WA

  7. View of Left Powerhouse, looking east. The multistory building to ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of Left Powerhouse, looking east. The multi-story building to the right contains the main control room for the powerplant complex. - Columbia Basin Project, Grand Coulee Dam Powerplant Complex, Grand Coulee, Grant County, WA

  8. Interior of Left Powerhouse showing generator Nos. 14. This view ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Interior of Left Powerhouse showing generator Nos. 1-4. This view is from the catwalk at the level of the overhead crane, looking west. - Columbia Basin Project, Grand Coulee Dam Powerplant Complex, Grand Coulee, Grant County, WA

  9. Interior of visitor's room at Left Powerhouse, containing terrazzo floor ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Interior of visitor's room at Left Powerhouse, containing terrazzo floor depicting a turbine-generator unit. - Columbia Basin Project, Grand Coulee Dam Powerplant Complex, Grand Coulee, Grant County, WA

  10. 2. FOREMAN'S HOUSE, SURGE TANK AND TOP OF POWERHOUSE. VIEW ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. FOREMAN'S HOUSE, SURGE TANK AND TOP OF POWERHOUSE. VIEW TO EAST-NORTHEAST. - Rainbow Hydroelectric Facility, On north bank of Missouri River 2 miles Northeast of Great Falls, & end of Rainbow Dam Road, Great Falls, Cascade County, MT

  11. 5. HOUSE No. 16 AND SURGE TANK. ROOF OF POWERHOUSE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. HOUSE No. 16 AND SURGE TANK. ROOF OF POWERHOUSE IN BACKGROUND. VIEW TO NORTHEAST. - Rainbow Hydroelectric Facility, On north bank of Missouri River 2 miles Northeast of Great Falls, & end of Rainbow Dam Road, Great Falls, Cascade County, MT

  12. VIEW WEST, SOUTH PENN POWERHOUSE, (FROM LEFT) BLEEDER SHED, ENGINE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW WEST, SOUTH PENN POWERHOUSE, (FROM LEFT) BLEEDER SHED, ENGINE HOUSE, BELT SHED, ECCENTRIC HOUSE. - South Penn Oil Company, G. M. Mead Lot 492 Lease, Morrison Run Field, Clarendon, Warren County, PA

  13. Interior of Right Powerhouse, generator room, looking east. The unit ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Interior of Right Powerhouse, generator room, looking east. The unit in the foreground is turbine-generator No. 11. - Columbia Basin Project, Grand Coulee Dam Powerplant Complex, Grand Coulee, Grant County, WA

  14. 87. Detail of powerhouse and tailrace; looking northeast. Photo by ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    87. Detail of powerhouse and tailrace; looking northeast. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power & Light Company, White River Hydroelectric Project, 600 North River Avenue, Dieringer, Pierce County, WA

  15. AERIAL PHOTO OF ELWHA RIVER, SPILLWAYS AT GLINES DAM, POWERHOUSE, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    AERIAL PHOTO OF ELWHA RIVER, SPILLWAYS AT GLINES DAM, POWERHOUSE, SURGE TANK AND TRANSFORMER YARD WITH HISTORIC SHED (WAREHOUSE). PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Glines Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA

  16. GENERAL AERIAL VIEW TO SOUTH OF ELWHA DAM AND POWERHOUSE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    GENERAL AERIAL VIEW TO SOUTH OF ELWHA DAM AND POWERHOUSE WITH NORTH END OF RESERVOIR. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Elwha Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA

  17. AERIAL PHOTO, LOOKING SOUTH, SHOWING POWERHOUSE, SURGE TANK, TRANSFORMER YARD, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    AERIAL PHOTO, LOOKING SOUTH, SHOWING POWERHOUSE, SURGE TANK, TRANSFORMER YARD, GLINES DAM, AND LAKE MILLS RESERVOIR. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Glines Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA

  18. GENERAL AERIAL VIEW, LOOKING SOUTH, AT GLINES DAM AND POWERHOUSE, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    GENERAL AERIAL VIEW, LOOKING SOUTH, AT GLINES DAM AND POWERHOUSE, LAKE MILLS RESERVOIR, AND THE ELWHA RIVER. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Glines Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA

  19. GLINES POWERHOUSE, TAILRACE, AND SURGE TANK WITH TRANSFORMER YARD IN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    GLINES POWERHOUSE, TAILRACE, AND SURGE TANK WITH TRANSFORMER YARD IN FOREGROUND; DAM AND RESERVOIR TO SOUTH. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Glines Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA

  20. VIEW TO WEST OF GLINES POWERHOUSE AND TAILRACE ON ELWHA ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW TO WEST OF GLINES POWERHOUSE AND TAILRACE ON ELWHA RIVER, WITH SURGE TANK IN FOREGROUND. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Glines Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA

  1. POWERHOUSE MAIN FLOOR INCLUDING WORKBENCH AND ARC WELDER IN RIGHT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    POWERHOUSE MAIN FLOOR INCLUDING WORKBENCH AND ARC WELDER IN RIGHT FOREGROUND. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Glines Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA

  2. VIEW INSIDE ELWHA POWERHOUSE LOOKING WEST TO EAST TOWARD GENERATORS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW INSIDE ELWHA POWERHOUSE LOOKING WEST TO EAST TOWARD GENERATORS #3 AND #4, WITH OIL PUMPS FOR GOVERNORS TO THE RIGHT. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Elwha Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA

  3. VIEW TO NORTH OF ELWHA RIVER, POWERHOUSE, SURGE TANK, AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW TO NORTH OF ELWHA RIVER, POWERHOUSE, SURGE TANK, AND PENSTOCK. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Elwha Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA

  4. HISTORIC SHED (NOW WAREHOUSE) AT TRANSFORMER YARD ABOVE GLINES POWERHOUSE. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    HISTORIC SHED (NOW WAREHOUSE) AT TRANSFORMER YARD ABOVE GLINES POWERHOUSE. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Glines Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA

  5. INTERIOR VIEW OF GLINES CANYON POWERHOUSE FROM TOP OF ENTRANCE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    INTERIOR VIEW OF GLINES CANYON POWERHOUSE FROM TOP OF ENTRANCE STAIRS. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Glines Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA

  6. 35. Inside Powerhouse No. 1. Opening for turbinegenerator shaft (southern ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    35. Inside Powerhouse No. 1. Opening for turbine-generator shaft (southern generator) in cast concrete substructure, top view - Sewall's Falls Hydroelectric Facility, East end of Second Street spanning Merrimack River, Concord, Merrimack County, NH

  7. 1. OVERVIEW OF SYSTEM, SHOWING POWERHOUSE, SWITCH HOUSE, PENSTOCK CONSTRUCTION ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. OVERVIEW OF SYSTEM, SHOWING POWERHOUSE, SWITCH HOUSE, PENSTOCK CONSTRUCTION SCAR, AND HOUSING AREA, LOOKING EAST, SOMETIME AFTER 1910 Historic photograph no. SC8715, no date - Centerville Hydroelectric System, Butte Creek, Centerville, Butte County, CA

  8. 156. Detail of lightning arrester on hillside above powerhouse; looking ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    156. Detail of lightning arrester on hillside above powerhouse; looking west. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power & Light Company, White River Hydroelectric Project, 600 North River Avenue, Dieringer, Pierce County, WA

  9. 154. Detail of lightning arrester on hillside above powerhouse; looking ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    154. Detail of lightning arrester on hillside above powerhouse; looking north. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power & Light Company, White River Hydroelectric Project, 600 North River Avenue, Dieringer, Pierce County, WA

  10. 155. Detail of lightning arrester on hillside above powerhouse; looking ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    155. Detail of lightning arrester on hillside above powerhouse; looking north. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power & Light Company, White River Hydroelectric Project, 600 North River Avenue, Dieringer, Pierce County, WA

  11. 8. Credit SHS. View of east elevation of powerhouse and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. Credit SHS. View of east elevation of powerhouse and water discharging from tailrace Note the absence of upper level windows on facade. Photo e. October 1901. - Battle Creek Hydroelectric System, Battle Creek & Tributaries, Red Bluff, Tehama County, CA

  12. Powerhouse east, north and west elevations and operating machinery, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Powerhouse - east, north and west elevations and operating machinery, battery storage building, and typical span of steel service bridge - Grand Valley Diversion Dam, Half a mile north of intersection of I-70 & Colorado State Route 65, Cameo, Mesa County, CO

  13. 72. Credit FM. Overview of powerhouse from gallery. Notice cooling ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    72. Credit FM. Overview of powerhouse from gallery. Notice cooling duct on generator (now removed) and spare gate valve in far corner. - Battle Creek Hydroelectric System, Battle Creek & Tributaries, Red Bluff, Tehama County, CA

  14. 7. INTERIOR VIEW POWERHOUSE, BUILDING, NO. 21, SHOWING DETAILS OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. INTERIOR VIEW POWERHOUSE, BUILDING, NO. 21, SHOWING DETAILS OF WOOD PATTERNS FOR MOLDS IN TEMPORARY STORAGE. - John A. Roebling's Sons Company, Kinkora Works, Support Systems, Roebling, Burlington County, NJ

  15. 9. INTERIOR VIEW POWERHOUSE, BUILDING, NO. 21, SHOWING DETAILS OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. INTERIOR VIEW POWERHOUSE, BUILDING, NO. 21, SHOWING DETAILS OF WOOD PATTERNS FOR MOLDS IN TEMPORARY STORAGE. - John A. Roebling's Sons Company, Kinkora Works, Support Systems, Roebling, Burlington County, NJ

  16. 8. INTERIOR VIEW POWERHOUSE, BUILDING, NO. 21, SHOWING DETAILS OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. INTERIOR VIEW POWERHOUSE, BUILDING, NO. 21, SHOWING DETAILS OF WOOD PATTERNS FOR MOLDS IN TEMPORARY STORAGE. - John A. Roebling's Sons Company, Kinkora Works, Support Systems, Roebling, Burlington County, NJ

  17. OVERVIEW OF POWERHOUSES FROM SOUTH SIDE OF RIVER; FACING NORTH ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    OVERVIEW OF POWERHOUSES FROM SOUTH SIDE OF RIVER; FACING NORTH - Shoshone Falls Hydroelectric Project, Reservoir and Dam Complex, North Bank of Snake River, extreme Eastern end of the Shoshone Falls Hydroelectric Project, Tipperary Corner, Jerome County, ID

  18. OVERVIEW OF PROJECT, INTAKE AT CENTER, POWERHOUSE AT LOWER LEFT, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    OVERVIEW OF PROJECT, INTAKE AT CENTER, POWERHOUSE AT LOWER LEFT, DAMS AT RIGHT; FACING NORTH-NORTHWEST - Shoshone Falls Hydroelectric Project, Canyon Road, North Bank of Snake River below Shoshone Falls, Tipperary Corner, Jerome County, ID

  19. 6. PLANT 2 POWERHOUSE AND TRANSFORMER BUILDING. NOTE ABSENCE OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. PLANT 2 POWERHOUSE AND TRANSFORMER BUILDING. NOTE ABSENCE OF DIAMOND-SHAPED WINDOWS VISIBLE ON TRANSFORMER BUILDING IN PRE-1970 PHOTOGRAPHS. VIEW TO WEST. - Bishop Creek Hydroelectric System, Plant 2, Bishop Creek, Bishop, Inyo County, CA

  20. 10. VIEW SOUTHWEST OF EAST SIDE OF OLD POWERHOUSE BASEMENT, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. VIEW SOUTHWEST OF EAST SIDE OF OLD POWERHOUSE BASEMENT, WITH TRIFLEX PISTON PURE FOR TURBINE BEARING LUBRICATION SYSTEM (LEFT), AND PIPE FOR LUBRICATING OIL PLUS CONSULTS FOR ELECTRICAL LEADS FROM GENERATORS (RIGHT) - Trenton Falls Hydroelectric Station, Powerhouse & Substation, On west bank of West Canada Creek, along Trenton Falls Road, 1.25 miles north of New York Route 28, Trenton Falls, Oneida County, NY

  1. Interior of Right Powerhouse, looking northeast, showing shaft from Francis ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Interior of Right Powerhouse, looking northeast, showing shaft from Francis turbine (below) extending to the generator (above). This is unit G-11, a Francis turbine that is identical to the others in the Right Powerhouse: manufactured in 1950 by the Newport News Shipbuilding and Drydock Company, Newport News, Virginia; 165,000 horsepower, 330 ft. head, 120 rpm. - Columbia Basin Project, Grand Coulee Dam Powerplant Complex, Grand Coulee, Grant County, WA

  2. 64. ELECTRIC MOTOR HAYES STREET POWERHOUSE 1905: Photocopy ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    64. ELECTRIC MOTOR - HAYES STREET POWERHOUSE - 1905: Photocopy of April 1905 photograph showing an early electric motor installation used to drive the winding machinery at the Hayes Street powerhouse of the United Railroads of San Francsico. A portion of the steam engine originally used to power the machinery is visible behind the winding sheave in the left background of the photograph. - San Francisco Cable Railway, Washington & Mason Streets, San Francisco, San Francisco County, CA

  3. 15. Interior of Right Powerhouse, looking east, showing turbinegenerator unit ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Interior of Right Powerhouse, looking east, showing turbine-generator unit No. 11, which is undergoing repair. This is generator is identical to the other eight units located in the Right Powerhouse: Westinghouse AC generator, 108,000 kva, 13,800 volts, 4,200 amps, 3 phase, 60 cycle, 1220 exciter amps, 250 exciter volts. - Columbia Basin Project, Grand Coulee Dam Powerplant Complex, Grand Coulee, Grant County, WA

  4. 39. DETAIL INTERIOR VIEW OF LEVEL +43.5 IN POWERHOUSE #1, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    39. DETAIL INTERIOR VIEW OF LEVEL +43.5 IN POWERHOUSE #1, SHOWING 2,400 VOLT BREAKER CABINETS. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  5. 22. DIABLO POWERHOUSE: COOLING WATER PUMPS (WESTINGHOUSE C.S. INDUCTION MOTORS), ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    22. DIABLO POWERHOUSE: COOLING WATER PUMPS (WESTINGHOUSE C.S. INDUCTION MOTORS), 1989. - Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 miles upstream from Newhalem, Newhalem, Whatcom County, WA

  6. 1. EAST SIDE/NORTH END EXTERIOR OF RUSH CREEK POWERHOUSE SHOWING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. EAST SIDE/NORTH END EXTERIOR OF RUSH CREEK POWERHOUSE SHOWING ROLLING METAL DOOR ON NORTH END, SWITCHRACKS NORTH OF POWERHOUSE AND WORKER COTTAGES IN COMPLEX. VIEW TO SOUTHWEST. - Rush Creek Hydroelectric System, Powerhouse Exciters, Rush Creek, June Lake, Mono County, CA

  7. Defining Powerhouse Fruits and Vegetables: A Nutrient Density Approach

    PubMed Central

    2014-01-01

    National nutrition guidelines emphasize consumption of powerhouse fruits and vegetables (PFV), foods most strongly associated with reduced chronic disease risk; yet efforts to define PFV are lacking. This study developed and validated a classification scheme defining PFV as foods providing, on average, 10% or more daily value per 100 kcal of 17 qualifying nutrients. Of 47 foods studied, 41 satisfied the powerhouse criterion and were more nutrient-dense than were non-PFV, providing preliminary evidence of the validity of the classification scheme. The proposed classification scheme is offered as a tool for nutrition education and dietary guidance. PMID:24901795

  8. 27. VIEW TO SOUTHWEST AT START OF POWERHOUSE RECONSTRUCTION: Photocopy ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    27. VIEW TO SOUTHWEST AT START OF POWERHOUSE RECONSTRUCTION: Photocopy of December 1906 photograph showing the start of reconstruction work on the powerhouse and car barn. View towards the southwest corner of the building. Note the winding sheaves under a partially completed protective shed on the left of the photograph. Also visible are the tension sheaves, and behind them the batteries of elephant boilers arrayed along the west wall of the building. - San Francisco Cable Railway, Washington & Mason Streets, San Francisco, San Francisco County, CA

  9. Response Amplification of Idealized Powerhouse Substructures to Earthquake Ground Motions

    DTIC Science & Technology

    2006-06-01

    the Cascadia subduction zone and closer shallow crustal faults, respectively. Chapter 2 Development of Earthquake Time-Histories 19 Figure 2-2...Madrid zone and closer shallow crustal faults 22 Chapter 2 Development of Earthquake Time-Histories CEUS Powerhouse Sites Equal Hazard Spectra

  10. 18. FLOOR PLAN AND SECTION DRAWING OF POWERHOUSE FOUNDATION AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. FLOOR PLAN AND SECTION DRAWING OF POWERHOUSE FOUNDATION AND DRAFT TUBE Power House Plan and Sections, drawing E-965. Prepared by the Washington Water Power Company, December 27, 1922, revised January 5, 1926. - Enloe Dam, Power House, On Similkameen River, Oroville, Okanogan County, WA

  11. 6. Interior of Left Powerhouse showing the Whiting (Company's) "Tiger" ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. Interior of Left Powerhouse showing the Whiting (Company's) "Tiger" crane with a capacity of 350 tons, looking west. Note the terrazzo floor below depicting a Francis turbine. - Columbia Basin Project, Grand Coulee Dam Powerplant Complex, Grand Coulee, Grant County, WA

  12. VIEW INSIDE ELWHA POWERHOUSE LOOKING EAST TO WEST TOWARD #4 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW INSIDE ELWHA POWERHOUSE LOOKING EAST TO WEST TOWARD #4 AND #3: 3333 KVA, 6600 V GENERATORS, WITH 300 RPM, 5000 HP TURBINES. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Elwha Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA

  13. 14. INTERIOR OF 1903 POWERHOUSE SHOWING TURBINEGENERATOR UNIT NO. 18, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. INTERIOR OF 1903 POWERHOUSE SHOWING TURBINE-GENERATOR UNIT NO. 18, MANUFACTURED BY GENERAL ELECTRIC IN 1949 AND RATED AT 150 MEGAWATTS. IT WAS RETIRED FROM SERVICE SEVERAL YEARS AGO. - Commonwealth Electric Company, Fisk Street Electrical Generating Station, 1111 West Cermak Avenue, Chicago, Cook County, IL

  14. 19. DETAIL OF INTERIOR OF POWERHOUSE SHOWING (LEFT TO RIGHT): ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. DETAIL OF INTERIOR OF POWERHOUSE SHOWING (LEFT TO RIGHT): SUBMERSIBLE TURBINE-GENERATOR (REMOVED FROM PENSTOCK AND PLACED HERE TEMPORARILY); GENERATOR; AND GOVERNOR - Middle Creek Hydroelectric Dam, On Middle Creek, West of U.S. Route 15, 3 miles South of Selinsgrove, Selinsgrove, Snyder County, PA

  15. Historic view of interior of powerhouse looking east; showing operator's ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Historic view of interior of powerhouse looking east; showing operator's platform containing control panel (center), and telephone booth (left) this booth was needed to reduce plant noise while using telephone. (photographer unknown, ca. 1920.) - Nooksack Falls Hydroelectric Plant, Route 542, Glacier, Whatcom County, WA

  16. Interior of powerhouse looking northwest; view of the housing for ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Interior of powerhouse looking northwest; view of the housing for the pelton wheels with operator's platform containing six backshot needle valves and type "Q" Lombard Governor (center); overhead is the 20-ton traveling crane (manufactured by northern engineering works of Detroit Michigan). - Nooksack Falls Hydroelectric Plant, Route 542, Glacier, Whatcom County, WA

  17. 29. Coke oven byproduct building "XX" with ammonia stills; powerhouse ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    29. Coke oven by-product building "XX" with ammonia stills; powerhouse with 8 sisters (stacks) in background; conveyor #20 (with break) on right, pulevrized coal storage bunker on left. Looking north/northwest - Rouge Steel Company, 3001 Miller Road, Dearborn, MI

  18. A LINE POLE 1 IN FOREGROUND AND MYSTIC LAKE POWERHOUSE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    A LINE POLE 1 IN FOREGROUND AND MYSTIC LAKE POWERHOUSE IN BACKGROUND. A LINE POLE 1 IS A MODERN REPLACEMENT STRUCTURE WITH BROWN PORCELAIN SUSPENSION-TYPE INSULATORS. VIEW TO EAST. - Mystic Lake Hydroelectric Facility, Electric Transmission A Line, Along West Rosebud Creek, Fishtail, Stillwater County, MT

  19. 63. VIEW OF TYPICAL TURBINE IN TURBINE WELL IN POWERHOUSE, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    63. VIEW OF TYPICAL TURBINE IN TURBINE WELL IN POWERHOUSE, LOOKING DOWN THE SHAFT FROM JUST ABOVE NORMAL WATER LEVEL. LADDER IS ON DOWNSTREAM WALL. PHOTOGRAPHER STOOD ON DECK SHOWN IN LOWER LEFT CORNER - Swan Falls Dam, Snake River, Kuna, Ada County, ID

  20. Interior of powerhouse looking northeast; view of the housing for ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Interior of powerhouse looking northeast; view of the housing for one of the two pelton wheels (both of which were manufactured by the Pelton Water Wheel Company of San Francisco, California, 1910) with type "Q" Lombard Governor and backshot needle valves on operator's platform. - Nooksack Falls Hydroelectric Plant, Route 542, Glacier, Whatcom County, WA

  1. Bonneville First Powerhouse ERDC Turbine Operating Range Investigation

    DTIC Science & Technology

    2017-05-01

    physical turbine model. Fish passage at on-cam turbine operations is investigated throughout the complete operating range of the B1 MGR to help determine...4 2 Physical Model...routes through the Bonneville First Powerhouse (B1), minimum gap runner (MGR), and draft tube using a 1:25 physical turbine model. Fish passage at

  2. 11. Credit JTL. North elevation of powerhouse showing sliding wood ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. Credit JTL. North elevation of powerhouse showing sliding wood doors used for easy installation and removal of equipment. Note painted surface indicating location of transformer annex (now removed). - Battle Creek Hydroelectric System, Battle Creek & Tributaries, Red Bluff, Tehama County, CA

  3. OBLIQUE VIEW OF POWERHOUSE OFFICE AND CORRUGATED METALCLAD VEHICLE GARAGE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    OBLIQUE VIEW OF POWERHOUSE OFFICE AND CORRUGATED METAL-CLAD VEHICLE GARAGE AND FUEL PUMP. MAINTENANCE BUILDING IS AT RIGHT CENTER. 90mm lens - Tule River Hydroelectric Complex, CA Highway 190 at North Fork of Middle Fork of Tule River, Springville, Tulare County, CA

  4. Interior of powerhouse looking southwest; view of north side of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Interior of powerhouse looking southwest; view of north side of operator's platform showing main oil pressure tank (left), and hydraulic gate valves (added CA. 1930) at the base of the platform. - Nooksack Falls Hydroelectric Plant, Route 542, Glacier, Whatcom County, WA

  5. VIEW OF LOCATION OF CHILDS POWER PLANT (SHOWING POWERHOUSE AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW OF LOCATION OF CHILDS POWER PLANT (SHOWING POWERHOUSE AND TRANSFORMER FRAMEWORK AT LEFT, BELOW POWER LINES AND THE MAINTENANCE AND RESIDENTIAL COMPOUND UPSTREAM TO RIGHT) ALONG VERDE RIVER FROM FS ROAD #502. LOOKING UPSTREAM (WEST-SOUTHWEST) - Childs-Irving Hydroelectric Project, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ

  6. The Grizzly Powerhouse: A modern high-head hydrogenerating facility

    SciTech Connect

    Siebensohn, F.B.

    1995-12-31

    With the emphasis on the modernization of existing plants, there are not all that many new hydropower stations being built nowadays. A noteworthy exception from this trend is the Grizzly Powerhouse, located in the High Sierra near Quincy in northern California. This new $75 million facility is an addition to the existing 65 MW Bucks Creek hydroelectric project on the North Fork Feather River watershed in Plumas County, that is owned and operated by Pacific Gas and Electric Company. The Grizzly project is a cooperative development between Pacific Gas and Electric and the City of Santa Clara. The City paid for the powerhouse and will receive its electricity for at least 30 years. Pacific Gas and Electric has an option to buy the Grizzly project thereafter. The energy generated serves about 15,000 homes in Santa Clara and meets approximately seven percent of the City`s current peak power needs. AMERICAN HYDRO CORPORATION of York, Pennsylvania was the Prime Contractor for the supply of the power generation equipment, and as such was responsible for the performance of the system components. These included the turbine with the inlet/shut-off valve, the pressure relief valve, the governor and the generator with its excitation system.

  7. G.E. SLATE SWITCHBOARD WITH RELAYS IN GLINES POWERHOUSE. ALSO NOTE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    G.E. SLATE SWITCHBOARD WITH RELAYS IN GLINES POWERHOUSE. ALSO NOTE 1926 PHONE BOOTH (STILL IN OPERATION). PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Glines Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA

  8. 67. Credit PG&E. Shot along length of powerhouse; exciters in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    67. Credit PG&E. Shot along length of powerhouse; exciters in the left foreground, 2000 kVA generator on right. Photo taken 10 November 1927. - Battle Creek Hydroelectric System, Battle Creek & Tributaries, Red Bluff, Tehama County, CA

  9. 8. Pennsylvania Railroad: 30th Street Station Powerhouse. Philadelphia, Philadelphia Co., ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. Pennsylvania Railroad: 30th Street Station Powerhouse. Philadelphia, Philadelphia Co., PA. Sec. 1101, MP 88.11. - Northeast Railroad Corridor, Amtrak route between Delaware-Pennsylvania & Pennsylvania-New Jersey state lines, Philadelphia, Philadelphia County, PA

  10. 36. SAR1, OVERVIEW OF POWERHOUSE AND HOUSING AREA FROM ACROSS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    36. SAR-1, OVERVIEW OF POWERHOUSE AND HOUSING AREA FROM ACROSS CANYON. EEC print no. G-C-01-00088, no date. Photograph by Benjamin F. Pearson. - Santa Ana River Hydroelectric System, Redlands, San Bernardino County, CA

  11. 42. SAR2, OVERVIEW OF POWERHOUSE AND HOUSING AREA, LOOKING NORTH, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    42. SAR-2, OVERVIEW OF POWERHOUSE AND HOUSING AREA, LOOKING NORTH, SHOWING HORSE-DRAWN BUGGY. SCE negative no. 3, no date. Photograph by G. Haven Bishop. - Santa Ana River Hydroelectric System, Redlands, San Bernardino County, CA

  12. 44. SAR3, GENERAL VIEW OF POWERHOUSE AND HOUSING AREA FROM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    44. SAR-3, GENERAL VIEW OF POWERHOUSE AND HOUSING AREA FROM THE NEW TRAIL ACROSS THE CANYON. SCE negative no. 4321, March 15, 1918. Photograph by G. Haven Bishop. - Santa Ana River Hydroelectric System, Redlands, San Bernardino County, CA

  13. Hydraulic design of Three Gorges right bank powerhouse turbine for improvement of hydraulic stability

    NASA Astrophysics Data System (ADS)

    Shi, Q.

    2010-08-01

    This paper presents the hydraulic design of Three Gorges Right Bank Powerhouse turbine for improvement of hydraulic stability. The technical challenges faced in the hydraulic design of the turbine are given. The method of hydraulic design for improving the hydraulic stability and particularly for eliminating the upper part load pressure pulsations is clarified. The final hydraulic design results of Three Gorges Right Bank Powerhouse turbine based on modern hydraulic design techniques are presented.

  14. 26. EAST FRONT AND SOUTH SIDE OF F&CH RWY POWERHOUSE: ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    26. EAST FRONT AND SOUTH SIDE OF F&CH RWY POWERHOUSE: Photocopy of a recently discovered c. 1904 photograph showing south side and east front of powerhouse and car barn. View is looking north along Mason Street. Cars exited the building and passed onto the mainline through the large doorway just to the right of the smokestack. Note the cable car descending Washington Street past the building. - San Francisco Cable Railway, Washington & Mason Streets, San Francisco, San Francisco County, CA

  15. TBM tunnel friction values for the Grizzly Powerhouse Project

    SciTech Connect

    Stutsman, R.D.; Rothfuss, B.D.

    1995-12-31

    Tunnel boring machine (TBM) driven water conveyance tunnels are becoming increasingly more common. Despite advances in tunnel engineering and construction technology, hydraulic performance data for TBM driven tunnels remains relatively unavailable. At the Grizzly Powerhouse Project, the TBM driven water conveyance tunnel was designed using friction coefficients developed from a previous PG&E project. A range of coefficients were selected to bound the possible hydraulic performance variations of the water conveyance system. These friction coefficients, along with the water conveyance systems characteristics, and expected turbine characteristics, were used in a hydraulic transient analysis to determine the expected system pressure fluctuations, and surge chamber performance. During startup test data, these performance characteristics were measured to allow comparison to the original design assumptions. During construction of the tunnel, plaster casts were made of the actual excavated tunnel unlined and fiber reinforced shotcrete lined surfaces. These castings were used to measure absolute roughness of the surfaces so that a friction coefficient could be developed using the Moody diagram and compare them against the design values. This paper compares the assumed frictional coefficient with computed coefficients from headlosses measured during startup testing, and plaster cast measurement calculations. In addition, a comparison of coefficients will be presented for an other TBM driven water conveyance tunnel constructed in the 1980`s.

  16. Description of five novel HLA-B alleles, B*07:184, B*41:27, B*42:19, B*50:32 and B*57:63, identified in Brazilian individuals.

    PubMed

    Fabreti-Oliveira, R A; Santos, M A; Oliveira, C K F; Vale, E M G; Vilela, B; Nascimento, E

    2014-06-01

    Five novel HLA-B alleles were identified by HLA-SBT typing in seven unrelated Brazilian individuals. The new alleles discovered include HLA-B*07:184, B*41:27, B*42:19, B*50:32 and B*57:63 and were officially named by the World Health Organization (WHO) Nomenclature Committee. All new HLA-B alleles had nonsynonymous nucleotide substitution polymorphisms when compared to their most closely related HLA-B allele. © 2014 John Wiley & Sons Ltd.

  17. Bonneville Powerhouse 2 3D CFD for the Behavioral Guidance System

    SciTech Connect

    Rakowski, Cynthia L.; Richmond, Marshall C.; Serkowski, John A.

    2010-02-01

    In 2008 and 2009, a 700 ft long, 10-ft deep floating forebay guidance wall called a behavioral guidance structure (BGS) was deployed in the Bonneville Powerhouse 2 forebay. The US Army Corps of Engineers, Portland District (CENWP) contracted with the Pacific Northwest National Laboratory (PNNL) to develop computational tools to assess the impact of the BGS on forebay hydraulics (this study). The tools developed here to provide a characterization of forebay hydraulics to be integrated with acoustic telemetry studies designed to measure the impact on juvenile salmon guidance and survival through Bonneville Powerhouse 2. In previous work, PNNL performed computational fluid dynamics (CFD) studies for the Bonneville forebay for CENWP. In this study, the existing model was modified to include the BGS. The model included a bay-by-bay spillway, a truncated Powerhouse 1 forebay, Powerhouse 2 turbine intakes and corner collector, and the forebay bathymetry extending approximately 1.5km upstream from the tip of Cascade Island. Model validation outcomes were similar to that of past studies. Additional checks were included on the impact of the differencing scheme to flow solution. It was found that using upwind differencing was adequate and it was possible to use a truncated computational mesh of this model that included a BGS upstream of Powerhouse 2 and increased spatial resolution in the vicinity of the BGS. This model has been validated, run, and provided to CENWP to use for additional analysis of the Powerhouse 2 forebay hydraulics. The PNNL particle tracking software (PT6) was used to assess the impacts of mass and relative buoyancy on particle fate. The particle tracker was run for the Half Load case for the clean forebay and for the forebay with the BGS in place and the Corner Collector on. All tracker cases showed that the BGS moved the particles across the forebay increasing the number of particles exiting the model through the Corner Collector and (for streamlines

  18. Cleanup Verification Package for the 126-F-1, 184-F Powerhouse Ash Pit

    SciTech Connect

    S. W. Clark and H. M. Sulloway

    2007-09-26

    This cleanup verification package documents completion of remedial action for the 126-F-1, 184-F Powerhouse Ash Pit. This waste site received coal ash from the 100-F Area coal-fired steam plant. Leakage of process effluent from the 116-F-14 , 107-F Retention Basins flowed south into the ash pit, contaminating the northern portion.

  19. Cleanup Verification Package for the 126-F-1, 184-F Powerhouse Ash Pit

    SciTech Connect

    S. W. Clark and H. M Sulloway

    2007-10-31

    This cleanup verification package documents completion of remedial action for the 126-F-1, 184-F Powerhouse Ash Pit. This waste site received coal ash from the 100-F Area coal-fired steam plant. Leakage of process effluent from the 116-F-14 , 107-F Retention Basins flowed south into the ash pit, contaminating the northern portion.

  20. NORTH EMBANKMENT IN FOREGROUND, WITH (LR) SUBSTATION (MI98D), POWERHOUSE (MI98C), ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    NORTH EMBANKMENT IN FOREGROUND, WITH (L-R) SUBSTATION (MI-98-D), POWERHOUSE (MI-98-C), AND COOKE DAM POND IN BACKGROUND. VIEW TO SOUTH - Cooke Hydroelectric Plant, North Embankment, Cook Dam Road at Au Sable River, Oscoda, Iosco County, MI

  1. 41. SAR2, GENERAL VIEW OF POWERHOUSE AND HOUSING AREA FROM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    41. SAR-2, GENERAL VIEW OF POWERHOUSE AND HOUSING AREA FROM THE NEW TRAIL ACROSS THE CANYON. SCE negative no. 4320, no date (but probably March 15, 1918: see HAER no. CA-130-44, no. 4321). Photograph by G. Haven Bishop. - Santa Ana River Hydroelectric System, Redlands, San Bernardino County, CA

  2. Bonneville Powerhouse 2 Fish Guidance Efficiency Studies: CFD Model of the Forebay

    SciTech Connect

    Rakowski, Cynthia L.; Serkowski, John A.; Richmond, Marshall C.

    2012-07-01

    In ongoing work, U.S. Army Corps of Engineers, Portland District (CENWP) is seeking to better understand and improve the conditions within the Bonneville Powerhouse 2 (B2) turbine intakes to improve survival of downstream migrant salmonid smolt. In this study, the existing B2 forebay computational fluid dynamics (CFD) model was modified to include a more detailed representation of all B2 turbine intakes. The modified model was validated to existing field-measured forebay ADCP velocities. The initial CFD model scenarios tested a single project operation and the impact of adding the Behavior Guidance System (BGS) or Corner Collector. These structures had impacts on forebay flows. Most notable was that the addition of the BGS and Corner Collector reduced the lateral extent of the recirculation areas on the Washington shore and Cascade Island and reduced the flow velocity parallel to the powerhouse in front of Units 11 and 12. For these same cases, at the turbine intakes across the powerhouse, there was very little difference in the flow volume into the gatewell for the clean forebay, and the forebay with the BGS in place and/or the Corner Collector operating. The largest differences were at Units 11 to 13. The CFD model cases testing the impact of the gatewell slot fillers showed no impact to the forebay flows, but large differences within the gatewells. With the slot fillers, the flow above the standard traveling screen and into the gatewell increased (about 100 cfs at each turbine intake) and the gap flow decreased across the powerhouse for all cases. The increased flow up the gatewell was further enhanced with only half the units operating. The flow into the gatewell slot was increased about 35 cfs for each bay of each intake across the powerhouse; this change was uniform across the powerhouse. The flows in the gatewell of Unit 12, the most impacted unit for the scenarios, was evaluated. In front of the vertical barrier screen, the CFD model with slot fillers

  3. Similar view to WA1832; Historic view just west of powerhouse ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Similar view to WA-18-32; Historic view just west of powerhouse during reconstruction of penstocks and replacement of original Francis Turbine with pelton wheels, in 1912; Derrick used to lift construction materials in center, the stairway to the right leads to the transformer house, the gable-roof building to the right is a workshop (built CA 1904), whitewashed building to the left is the company hotel (built CA. 1904, and the gable-roof building in the distance is a barn (built CA. 1904). (photographer unknown, ca 1912.) - Nooksack Falls Hydroelectric Plant, Route 542, Glacier, Whatcom County, WA

  4. Monitoring and Evaluation of the Prototype Surface Collector at Bonneville First Powerhouse in 2000: Synthesis of Results

    SciTech Connect

    Johnson, Gary E.; Carlson, Thomas J.

    2001-06-01

    This report describes research done to evaluate the Prototype Surface Collector at Bonneville Dam, Powerhouse I, on the Columbia River. The surface collector is being evaluated as a means for bringing downstream migrating salmon and steelhead through the powerhouse while avoiding the turbines. The report describes evaluations conducted by PNNL, National Marine Fisheries Service, and various contractors using radio telemetry, hydroacoustics, and computational fluid dynamics models. The evaluation will provide information to the U.S. Army Corps of Engineers for their 2001 decision on whether to use surface flow bypass or extended-length submersible bar screens for long-term smolt passage at Bonneville Dam.

  5. Portable Powerhouses.

    ERIC Educational Resources Information Center

    Myslewski, Rik; Garcia, Nathan

    1998-01-01

    Reviews and compares the following nine laptop computers, focusing on their capabilities for multimedia presentations: Apple Macintosh PowerBook G3, Chem USA ChemBook 9780, Compaq Armada 7792DMT, Dell Inspiron 3000 mZ66xT, Hewlett-Packard OmniBook 3000CTX, IBM ThinkPad 770, Micro Express NP8233MMX, NEC Versa 6260, and Panasonic CF-63. Evaluation…

  6. Portable Powerhouses.

    ERIC Educational Resources Information Center

    Myslewski, Rik; Garcia, Nathan

    1998-01-01

    Reviews and compares the following nine laptop computers, focusing on their capabilities for multimedia presentations: Apple Macintosh PowerBook G3, Chem USA ChemBook 9780, Compaq Armada 7792DMT, Dell Inspiron 3000 mZ66xT, Hewlett-Packard OmniBook 3000CTX, IBM ThinkPad 770, Micro Express NP8233MMX, NEC Versa 6260, and Panasonic CF-63. Evaluation…

  7. Electrical Activity of Powerhouse Muscles During the Teaser Exercise of Pilates Using Different Types of Apparatus.

    PubMed

    Werba, Débora da Rocha; Cantergi, Débora; Tolfo Franzoni, Leandro; Fagundes, Alex de Oliveira; Fagundes Loss, Jefferson; Nogueira Haas, Aline

    2017-04-01

    We compared the electrical activity of certain powerhouse muscles-External Oblique, Multifidus, Adductor Longus, and Gluteus Medius-during the teaser exercise of the Pilates Method, performed on various types of apparatus-the Mat, Reformer, and Wall Unit. Fifteen female practitioners of the Classic Pilates Method (32.6 ± 7.7 years old; 21.9 ± 1.9 body mass index) performed the teaser in each situation while electromyographic (EMG) and kinematic data were collected. Root mean square values of the flexion phase were compared. All muscles showed higher EMG activity in Reformer compared with Wall Unit, and Multifidus, Adductor Longus, and Gluteus Medius showed higher EMG activity in Mat compared with Wall Unit. No difference was found between Reformer and Mat.

  8. Failure Mechanisms and Evolution Assessment of the Excavation Damaged Zones in a Large-Scale and Deeply Buried Underground Powerhouse

    NASA Astrophysics Data System (ADS)

    Li, Hai-bo; Liu, Ming-chang; Xing, Wan-bo; Shao, Shuai; Zhou, Jia-wen

    2017-07-01

    The Jinping I underground powerhouse is deeply buried and is one of the largest underground powerhouses in China. As a result of high levels of in situ stress, complex geological conditions and the effects of excavation in adjacent caverns, the surrounding rock mass has been severely deformed and broken, and excavation damaged zones (EDZs) have become major obstacles to the design of cavern excavation and support. Field investigations and monitoring data indicated that there are two main modes of failure: high tangential stress induced failure and progressive failure, which have occurred on the mountain side and the river valley side of the Jinping I underground powerhouse. These two main modes of failure were due to strong secondary principal stress forces in the sub-parallel directions and sub-vertical directions, acting on the axes of the main powerhouse on the mountain side and on the river valley side, respectively. Deformations and EDZs on the river valley side were generally larger than those found along the mountain side, and the distribution of deformations was consistent with the distribution of EDZs. The evolution of the EDZ on the river valley side has clearly been time dependent, especially along the downstream arch abutment, and the EDZ was considerably enlarged with further excavation. Additionally, the deformation of the surrounding rock mass was first initiated from the edge of the excavation area and gradually extended to deeper areas away from the opening. However, the EDZ on the mountain side was enlarged only during the first two phases of excavation. The extension of pre-existing cracks and the creation of new fractures has mainly occurred in the oldest EDZ section, and the HDZ has been visibly enlarged, whereas the EDZ has shown little change in other excavation phases.

  9. Random Blocks in the Rock Mass Around the Underground Powerhouse on the Right Bank of Wudongde Hydropower Station

    NASA Astrophysics Data System (ADS)

    Lu, X.; Wang, X.; Yu, Q.

    2014-12-01

    The geometry and stability of random blocks are fundamental to support design of underground powerhouse of Wudongde hydropower station. This paper systematically analyses the characteristics of random blocks in the underground powerhouse on the right bank of Wudongde hydropower station. Based on the theory of the general block method and data of fractures obtained from the field survey, the discrete fracture network model is established by an inverse method for identifying and analyzing random blocks. The calculation is realized for 10 times at random by GeneralBlock to reduce the influence of randomness. The results show that most of random blocks formed by discontinuities and excavations can be found in the vault of the powerhouse; for the 10 realizations, the average number of the random blocks is 414; the average volume of the blocks is 2.9m3 and the maximum volume of the blocks is 152.0 m3; the average depth of the blocks is 1.2m and the maximum depth is 8.8m. Most of the blocks are stable. Most of the unstable blocks present a failure of falling. Most removable blocks have 3 or 4 discontinuities and the maximum value is 12; fractures with west dip-direction and medium dip are the most dangerous for forming unstable blocks. Therefore, it is suggested that the anchor bolts should pierce through the fractures of west dip-direction and medium dip.

  10. Bonneville Second Powerhouse Tailrace and High Flow Outfall: ADCP and drogue release field study

    SciTech Connect

    Cook, Christopher B.; Richmond, Marshall C.; Guensch, Gregory R.

    2001-03-20

    The Bonneville Project is one of four US Army Corps of Engineers operated dams along the Lower Columbia River. Each year thousands of smelt pass through this Project on their way to the Pacific Ocean. High flow outfalls, if specifically designed for fish passage, are thought to have as good or better smelt survival rates as spillways. To better understand the hydrodynamic flow field around an operating outfall, the Corps of Engineers commissioned measurement of water velocities in the tailrace of the Second Powerhouse. These data also are necessary for proper calibration and verification of three-dimensional numerical models currently under development at PNNL. Hydrodynamic characterization of the tailrace with and without the outfall operating was accomplished through use of a surface drogue and acoustic Doppler current profiler (ADCP). Both the ADCP and drogue were linked to a GPS (global positioning system); locating the data in both space and time. Measurements focused on the area nearest to the high flow outfall, however several ADCP transects and drogue releases were performed away from the outfall to document ambient flow field conditions when the outfall was not operating.

  11. Water Velocity Measurements on a Vertical Barrier Screen at the Bonneville Dam Second Powerhouse

    SciTech Connect

    Hughes, James S.; Deng, Zhiqun; Weiland, Mark A.; Martinez, Jayson J.; Yuan, Yong

    2011-11-22

    Fish screens at hydroelectric dams help to protect rearing and migrating fish by preventing them from passing through the turbines and directing them towards the bypass channels by providing a sweeping flow parallel to the screen. However, fish screens may actually be harmful to fish if they become impinged on the surface of the screen or become disoriented due to poor flow conditions near the screen. Recent modifications to the vertical barrier screens (VBS) at the Bonneville Dam second powerhouse (B2) intended to increase the guidance of juvenile salmonids into the juvenile bypass system (JBS) have resulted in high mortality and descaling rates of hatchery subyearling Chinook salmon during the 2008 juvenile salmonid passage season. To investigate the potential cause of the high mortality and descaling rates, an in situ water velocity measurement study was conducted using acoustic Doppler velocimeters (ADV) in the gatewell slot at Units 12A and 14A of B2. From the measurements collected the average approach velocity, sweep velocity, and the root mean square (RMS) value of the velocity fluctuations were calculated. The approach velocities measured across the face of the VBS varied but were mostly less than 0.3 m/s. The sweep velocities also showed large variances across the face of the VBS with most measurements being less than 1.5 m/s. This study revealed that the approach velocities exceeded criteria recommended by NOAA Fisheries and Washington State Department of Fish and Wildlife intended to improve fish passage conditions.

  12. Performance of a prototype surface collector for juvenile salmonids at Bonneville dam's first powerhouse on the Columbia River, Oregon

    USGS Publications Warehouse

    Evans, S.D.; Adams, N.S.; Rondorf, D.W.; Plumb, J.M.; Ebberts, B.D.

    2008-01-01

    During April-July 2000, we radio-tagged and released juvenile Chinook salmon (Oncorhynchus tshawytscha) and steelhead (Oncorhynchus mykiss) to evaluate a prototype surface flow bypass at Bonneville Dam on the Columbia River. The mock bypass, called a prototype surface collector (PSC), had six vertical slot entrances that were each 6 m wide and 12 m deep. The PSC was retrofitted to the upstream face of Bonneville Dam's First Powerhouse. Our objectives were to: (1) assess species-specific differences in movement patterns and behaviour of fish within 6 m of the face of the PSC, (2) estimate the efficiency and effectiveness of the PSC and (3) evaluate factors affecting the performance of the PSC. We found that 60-72% of the fish, depending on species, detected within 6 m of the PSC entered it. Of the fish that passed the First Powerhouse at turbines 1-6, 79-83% entered the PSC. Diel period was a significant contributor to PSC performance for all species, and day of year was a significant contributor to PSC performance for subyearling Chinook salmon. The PSC was twice as effective (%fish/%flow) as the spillway, passing 2.5:1 steelhead and subyearling Chinook salmon and 2.4:1 yearling Chinook salmon per unit of water. If fully implemented, the PSC would increase the percentage of fish that pass the First Powerhouse through non-turbine routes from 65-77% (without the PSC) to 76-85% (with the PSC), depending on species. Published in 2008 by John Wiley & Sons, Ltd.

  13. Passage probabilities of juvenile Chinook salmon through the powerhouse and regulating outlet at Cougar Dam, Oregon, 2011

    USGS Publications Warehouse

    Beeman, John W.; Hansen, Amy C.; Evans, Scott D.; Haner, Philip V.; Hansel, Hal C.; Smith, Collin D.

    2012-01-01

    Cougar Dam near Springfield, Oregon, is one of several federally owned and operated flood-control projects within the Willamette Valley of western Oregon that were determined by the National Oceanic and Atmospheric Administration’s National Marine Fisheries Service in 2008 to impact the long-term viability of several salmonid stocks. In response to this ruling, the U.S. Army Corps of Engineers is looking for means to reduce impacts to salmonids, including improving downstream passage of juvenile salmonids at Cougar Dam. This study of juvenile Chinook salmon (Oncorhynchus tshawytscha) passage at Cougar Dam was conducted to inform decisions about potential improvements for downstream fish passage. The primary objective of the study was to estimate route-specific passage probabilities of yearling Chinook salmon at Cougar Dam. The study was conducted using fish from a nearby hatchery surgically implanted with radio transmitters and passive integrated transponder (PIT) tags and released near the entrance of a temperature control tower through which all water going through the dam must pass. Water passing through the temperature control tower may be routed through a penstock to a powerhouse with two Francis turbines, or to a spillway-like structure called the regulating outlet. Secondary objectives of the study were to estimate the probability that fish enter a bypass at a non-federal facility downstream, and to estimate dam-passage and in-river fish survival. Dam operating conditions during the study included an average forebay elevation of 1,580 feet (National Geodetic Vertical Datum of 1929) and an average of 48.2 percent of the total dam discharge of 1,106 cubic feet per second passing through a regulating outlet opening of 1.25 feet. Dam passage probability was greatest at night (0.8741 standard error [SE] 0.0265) and primarily through the regulating outlet (0.8896 SE 0.0617 day; 0.9417 SE 0.0175 night). The joint probability of entering the bypass at Leaburg Dam

  14. Emergency assessment of post-fire debris-flow hazards for the 2013 Powerhouse fire, southern California

    USGS Publications Warehouse

    Staley, Dennis M.; Smoczyk, Gregory M.; Reeves, Ryan R.

    2013-01-01

    Wildfire dramatically alters the hydrologic response of a watershed such that even modest rainstorms can produce dangerous flash floods and debris flows. Existing empirical models were used to predict the probability and magnitude of debris-flow occurrence in response to a 10-year recurrence interval rainstorm for the 2013 Powerhouse fire near Lancaster, California. Overall, the models predict a relatively low probability for debris-flow occurrence in response to the design storm. However, volumetric predictions suggest that debris flows that occur may entrain a significant volume of material, with 44 of the 73 basins identified as having potential debris-flow volumes between 10,000 and 100,000 cubic meters. These results suggest that even though the likelihood of debris flow is relatively low, the consequences of post-fire debris-flow initiation within the burn area may be significant for downstream populations, infrastructure, and wildlife and water resources. Given these findings, we recommend that residents, emergency managers, and public works departments pay close attention to weather forecasts and National-Weather-Service-issued Debris Flow and Flash Flood Outlooks, Watches, and Warnings and that residents adhere to any evacuation orders.

  15. Evaluation of Fish Losses through Screen Gaps at Modified and Unmodified Intakes of Bonneville Dam Second Powerhouse in 2003

    SciTech Connect

    Ploskey, Gene R.; Weiland, Mark A.; Schilt, Carl R.

    2004-06-14

    This report was prepared by the Pacific Northwest National Lab., Richland, Washington, BAE Systems, Inc., a subcontractor to the U.S. Army Engineer Research and Development Center (ERDC), Vicksburg, Mississippi. This study examined the effect of gatewell modifications on the proportion of fish lost through the gap between the top of submerged traveling screens (STSs) and the ceilings of intakes in one un-modified and two modified turbine units at Bonneville Dam Second Powerhouse (B2). Combined modifications reduced the proportion of flow through the gap from 44% to 16% and increased the proportion moving up the gatewell from 56% to 84%. We used a Dual-Frequency Identification Sonar (DIDSON) acoustic camera to record proportions of juvenile salmonids moving up into the gatewell and through the gap. The acoustic camera was used to record images of fish passing up into the gatewell and through the gap for 8-h on three successive nights in every intake of units 13, 15, and 17 (i.e., 9 intakes x 3 nights = 27 nights each season). Only 28.6% of the objects detected in spring and 12.9% in summer were determined to be fish. Other objects included sticks and debris. Although the true magnitude of STS gap-loss is unknown, both acoustic camera and netting estimates indicate that gatewell modifications reduce relative gap loss by about 67%.

  16. Characterization of Gatewell Orifice Lighting at the Bonneville Dam Second Powerhouse and Compendium of Research on Light Guidance with Juvenile Salmonids

    SciTech Connect

    Mueller, Robert P.; Simmons, Mary Ann

    2007-12-29

    The goal of the study described in this report is to provide U.S. Army Corps of Engineers (USACE) biologists and engineers with general design guidelines for using artificial lighting to enhance the passage of juvenile salmonids into the collection channel at the Bonneville Dam second powerhouse (B2). During fall 2007, Pacific Northwest National Laboratory (PNNL) researchers measured light levels in the field at one powerhouse orifice through which fish must pass to reach the collection channel. Two light types were evaluated—light-emitting diode (LED) lights and halogen spot lights. Additional measurements with mercury lamps were made at the PNNL Aquatic Research Laboratory to determine baseline intensity of the current lighting. A separate chapter synthesizes the relevant literature related to light and fish guidance for both field and laboratory studies. PNNL will also review the Corps plans for existing lighting protocol at all of the Portland District projects and help develop a uniform lighting scheme which could be implemented. The specific objectives for this study are to 1. Create a synthesis report of existing lighting data for juvenile salmonid attraction and deterrence and how the data are used at fish bypass facilities. 2. Evaluate current B2 orifice lighting conditions with both LED and halogen sources. 3. Make recommendations as to what lighting intensity, source, and configuration would improve passage at the B2 orifices. 4. Review USACE plans for retrofit of existing systems (to be assessed at a later date).

  17. Evaluation of Steelhead Kelt Passage into the Bonneville Dam Second Powerhouse Corner Collector Prior to the Juvenile Migration Seasons, 2007 and 2008

    SciTech Connect

    Weiland, Mark A.; Kim, Jina; Nagy, William T.; Johnson, Gary E.

    2009-09-01

    This report documents the results of a steelhead kelt passage study conducted by the PNNL for the U.S. Army Corps of Engineers at Bonneville Dam in early spring 2007 and 2008. At the Second Powerhouse, a surface flow outlet called the corner collector (B2CC) may be an effective non-turbine passage route for steelhead kelt moving downstream in early spring before the main juvenile emigration season. The goal of this project was to inform management decisions regarding B2CC operations by estimating the number of kelt using the B2CC for downstream passage at Bonneville Dam prior to the juvenile spring migration season. We performed a hydroacoustic study from March 2 to April 10, 2007 and from March 13 to April 15, 2008.

  18. Evaluation of a prototype surface flow bypass for juvenile salmon and steelhead at the powerhouse of Lower Granite Dam, Snake River, Washington, 1996-2000

    USGS Publications Warehouse

    Johnson, G.E.; Anglea, S.M.; Adams, N.S.; Wik, T.O.

    2005-01-01

    A surface flow bypass takes advantage of the natural surface orientation of most juvenile salmon Oncorhynchus spp. and steelhead O. mykiss by providing a route in the upper water column that downstream migrant fishes can use to pass a hydroelectric dam safely. A prototype structure, called the surface bypass and collector (SBC), was retrofitted on the powerhouse of Lower Granite Dam and was evaluated annually with biotelemetry and hydroacoustic techniques during the 5-year life span of the structure (1996-2000) to determine the entrance configuration that maximized passage efficiency and minimized forebay residence time. The best tested entrance configuration had maximum inflow (99 m 3/s) concentrated in a single surface entrance (5 m wide, 8.5 m deep). We identified five important considerations for future surface flow bypass development in the lower Snake River and elsewhere: (1) an extensive flow net should be formed in the forebay by use of relatively high surface flow bypass discharge (>7% of total project discharge); (2) a gradual increase in water velocity with increasing proximity to the surface flow bypass (ideally, acceleration 3 m/s) to entrain the subject juvenile fishes; (4) the shape and orientation of the surface entrance(s) should be adapted to fit site-specific features; and (5) construction of a forebay wall to increase fish availability to the surface flow bypass should be considered. The efficiency of the SBC was not high enough (maximum of 62% relative to passage at turbine units 4-5) for the SBC to operate as a stand-alone bypass. Anywhere that surface-oriented anadromous fish must negotiate hydroelectric dams, surface flow bypass systems can provide cost-effective use of typically limited water supplies to increase the nonturbine passage, and presumably survival, of downstream migrants. ??Copyright by the American Fisheries Society 2005.

  19. Outfall Site and Type Selection for a New Surface Flow Outlet to Pass Juvenile Fish at Bonneville Dam’s Second Powerhouse, Columbia River

    SciTech Connect

    Johnson, Gary E.; Ebberts, Blaine; Giorgi, Albert E.; Kuhn, Karen; Lee, Randy; Plump, John H.; Stensby, David A.; Sweeney, Charles E.

    2008-08-01

    A site near the downstream tip of Cascades Island and a mid-level cantilever outfall type were selected for the high flow outfall of the new surface flow juvenile fish bypass at Bonneville Dam’s Second Powerhouse. The new bypass will be a modification of the existing ice and trash sluice chute, which discharges into the tailrace with jet impact on the bottom near a shoreline that predators inhabit. Thus, a new site and type are necessary for this high flow (> 28.3 m3/s) outfall. Technical guidelines on high flow outfall location and design were established and applied during the outfall development process. Critical design parameters included discharge at 150 m3/s, entry velocities approaching 15.2 m/s, and tailwater elevation range of 6.1 m. For outfall siting, the selection process began with identification of nine initial alternatives. Screening, evaluation, and selection stages narrowed the list to two sites – “Range D” 121.9 m straight downstream from the existing outfall and “Range F” 760 m downstream near the tip of Cascades Island. For outfall type, the selection process was initiated with conceptualization of 13 alternatives. During successive screening, evaluation, consolidation, and selection stages, professional judgment and quantitative comparisons were used to select two finalists – “Adjustable Cantilever” and “Mid-Level Cantilever.” The four combinations of outfall site/type were evaluated in 1:30 and 1:100 scale physical hydraulic models. The process resulted in selection of a mid-level cantilever with plunge pool at the tip of Cascades Island. The system is scheduled for completion in March 2004.

  20. InSight Mission Education and Communication: Powerhouse partners leverage global networks to put authentic planetary science into the hands and minds of students of all ages

    NASA Astrophysics Data System (ADS)

    Banerdt, W. B.; Jones, J. H.

    2015-12-01

    InSight Mission Education and Communication: Powerhouse Partners Leverage Global Networks To Put Authentic Planetary Science into the Hands and Minds of Students. NASA's InSight (Interior Exploration using Seismic Investigations, Geodesy and Heat Transport) is a NASA Discovery Program mission that will place a single geophysical lander on Mars to study its deep interior. InSight will launch in March 2016 aboard an Atlas V 401 rocket from Space Launch Complex 3E at Vandenberg Air Force Base in California, and land on Mars in September 2016, beginning science return in October 2016.By using sophisticated geophysical instruments, InSight will delve deep beneath the surface of Mars, detecting the fingerprints of the processes of terrestrial planet formation, as well as measuring the planet's "vital signs": Its "pulse" (seismology), "temperature" (heat flow probe), and "reflexes" (precision tracking). InSight's E/PO Partners all of which already work with NSF, Department of Education and NASA will put authentic Mars data and analysis tools in the hands of educators, students and the public. IRIS - Incorporated Research Institutions for Seismology provides lessons, seismograph software, animations, videos, and will use InSight data to focus on how students can compare seismic data from Mars and Earth. SCEC - Southern California Earthquake Center's "Vital Signs of the Planet" professional development program for science teachers is creating, and test teaching standards-aligned STEM materials to help additional teachers work with comparative planetary concepts. They are also installinglow cost strong motion research accelerometers in all participating schools. ASP - Astronomical Society of the Pacific will deliver Planet Core Outreach toolkits with an InSight focus to 380 amateur astronomy clubs engaged in Informal Education. Space Math - delivered twenty standards based mathematics lessons using InSight and Mars physical and science data which enable students to acquire

  1. Outfall Site and Type Selection for a New Surface Flow Outlet to Pass Juvenile Salmonids at Bonneville Dam’s Second Powerhouse, Columbia River

    SciTech Connect

    Johnson, Gary E.; Ebberts, Blaine D.; Giorgi, Albert E.; Kuhn, Karen; Lee, Randall T.; Plump, John H.; Stensby, David A.; Sweeney, Charles E.

    2008-01-01

    A site near the downstream tip of Cascades Island with a mid-level chute outfall type was selected for the high flow (> 28.3 m3/s) outfall of the new surface flow outlet for juvenile salmonids at Bonneville Dam’s Second Powerhouse (B2). The new passage route and outfall are a result of modifications to the original ice and trash sluice chute to increase discharge capacity and improve passage conditions, including a new outfall type and site. Technical guidelines on high flow outfall location and design were established concurrently with the outfall development process. Critical design parameters for the new B2 outfall included discharge of 150 m3/s, jet entry velocities approaching 15.2 m/s, and a tailwater elevation range of 6.1 m. For outfall siting, the selection process began with identification of nine initial alternatives. Screening, evaluation, and selection stages narrowed the list to two outfall sites – “Range D” 122 m directly downstream from the existing sluice chute outfall and “Range F” 760 m downstream near the end of Cascades Island. For outfall type, the selection process was initiated with conceptualization of 13 alternatives. Following successive screening, evaluation, consolidation, and selection stages, two outfall types became finalists – “Adjustable Cantilever” and “Mid-Level Cantilever.” The four combinations of outfall site/type were evaluated in 1:30 and 1:100 scale physical hydraulic models and a Mid-Level Cantilever at the tip of Cascades Island in Range F was selected. During further engineering after our study, the cantilever was replaced with a monolith structure to reduce construction costs, resulting in a mid-level chute outfall that was installed in 2004. Post-construction evaluations indicated survival rates around 100% through the B2CC were the highest of all passage routes at Bonneville Dam. The B2CC surface flow outlet with its high flow outfall provided a major improvement to juvenile salmonid passage at

  2. Solar Energy: Potential Powerhouse for Jobs

    ERIC Educational Resources Information Center

    McCallion, Tom

    1976-01-01

    Components of solar energy systems are described, the development of the solar industry discussed, and implications are drawn for employment opportunities in industries (which may expand into new, solar-related areas) and in the professions, from law to sales, upon the advent of solar heating. (AJ)

  3. Invisalign and porecelain: the contemporary restorative powerhouse.

    PubMed

    Smallwood, Trent W

    2009-12-01

    For years, restorative practices and traditional orthodontics stood largely separate from one another save for the most extreme instances. Orthodontics has evolved over the years, and a new breed of orthodontic technology appeared in the late 1990s. A clear alternative to traditional orthodontics emerged, and Invisalign (Align Technology, Inc., Santa Clara, CA) was born. Historically, orthodontics and restorative work, within a practice, rarely coincided on the same patient, but the advances within both disciplines have afforded a new and innovative way of considering conservative dentistry. No longer does there have to be aggressive preparation to attain a desired result. With patient understanding, a negligible amount of patience, and the desire to achieve the very best dentistry has to offer, the potential is limitless.

  4. Ectopic Lymphoid Structures: Powerhouse of Autoimmunity

    PubMed Central

    Corsiero, Elisa; Nerviani, Alessandra; Bombardieri, Michele; Pitzalis, Costantino

    2016-01-01

    Ectopic lymphoid structures (ELS) often develop at sites of inflammation in target tissues of autoimmune diseases, such as rheumatoid arthritis, Sjögren’s syndrome, multiple sclerosis, myasthenia gravis, and systemic lupus erythematosus. ELS are characterized by the formation of organized T/B cells aggregates, which can acquire follicular dendritic cells network supporting an ectopic germinal center response. In this review, we shall summarize the mechanisms that regulate the formation of ELS in tertiary lymphoid organs, with particular emphasis on the role of lymphoid chemokines in both formation and maintenance of ELS, the role of emerging positive and negative regulators of ELS development and function, including T follicular helper cells and IL-27, respectively. Finally, we shall discuss the main functions of ELS in supporting the affinity maturation, clonal selection, and differentiation of autoreactive B cells contributing to the maintenance and perpetuation of humoral autoimmunity. PMID:27799933

  5. Manganese Superoxide Dismutase: Guardian of the Powerhouse

    PubMed Central

    Holley, Aaron K.; Bakthavatchalu, Vasudevan; Velez-Roman, Joyce M.; St. Clair, Daret K.

    2011-01-01

    The mitochondrion is vital for many metabolic pathways in the cell, contributing all or important constituent enzymes for diverse functions such as β-oxidation of fatty acids, the urea cycle, the citric acid cycle, and ATP synthesis. The mitochondrion is also a major site of reactive oxygen species (ROS) production in the cell. Aberrant production of mitochondrial ROS can have dramatic effects on cellular function, in part, due to oxidative modification of key metabolic proteins localized in the mitochondrion. The cell is equipped with myriad antioxidant enzyme systems to combat deleterious ROS production in mitochondria, with the mitochondrial antioxidant enzyme manganese superoxide dismutase (MnSOD) acting as the chief ROS scavenging enzyme in the cell. Factors that affect the expression and/or the activity of MnSOD, resulting in diminished antioxidant capacity of the cell, can have extraordinary consequences on the overall health of the cell by altering mitochondrial metabolic function, leading to the development and progression of numerous diseases. A better understanding of the mechanisms by which MnSOD protects cells from the harmful effects of overproduction of ROS, in particular, the effects of ROS on mitochondrial metabolic enzymes, may contribute to the development of novel treatments for various diseases in which ROS are an important component. PMID:22072939

  6. Trends & Indicators: NE Universities Still R&D Powerhouses

    ERIC Educational Resources Information Center

    Harney, John O.

    2011-01-01

    New England universities performed more than $4 billion worth of research and development (R&D) in 2009, but the region's share of total R&D performed by all U.S. universities remained at 7.3%, down from more than 10% in the 1980s. The region's university research labs have been world-famous for ideas that breed companies and whole…

  7. Gas Hydrates: From Laboratory Curiosity to Potential Global Powerhouse

    NASA Astrophysics Data System (ADS)

    Pellenbarg, Robert E.; Max, Michael D.

    2001-07-01

    Clathrates are a nonstoichiometric class of compounds that consist of a three-dimensional host molecule lattice and voids in the lattice that can be occupied by guest molecules, particularly common gases (e.g. methane, CH4). Where the host crystal structure is water the clathrate is termed a hydrate; these are the focus of increasing research. Methane (natural gas) hydrates are now recognized to occur in huge volumes in deep marine sediments and permafrost. These naturally occurring hydrates may constitute the next major energy resource of the planet and could provide the basis for the transition from our present petroleum economy to one based on methane.

  8. Shanghai Cooperation Organization: Paper Tiger or Regional Powerhouse

    DTIC Science & Technology

    2005-09-01

    The China Quarterly no. 133 (March 1993): 130-151 Chung , Chien-Peng. “The Defense of Xinjiang,” Harvard International Review 25, no. 2 (1 July...eds. Russia, the Caucasus, and Central Asia: The 21st Century Security Environment. Armonk, NY: M.E. Sharpe, 1999. Miller, Leland R. New Rules

  9. Artery Tertiary Lymphoid Organs: Powerhouses of Atherosclerosis Immunity

    PubMed Central

    Yin, Changjun; Mohanta, Sarajo Kumar; Srikakulapu, Prasad; Weber, Christian; Habenicht, Andreas J. R.

    2016-01-01

    Artery tertiary lymphoid organs (ATLOs) are atherosclerosis-associated lymphoid aggregates with varying degrees of complexity ranging from small T/B-cell clusters to well-structured lymph node-like though unencapsulated lymphoid tissues. ATLOs arise in the connective tissue that surrounds diseased arteries, i.e., the adventitia. ATLOs have been identified in aged atherosclerosis-prone hyperlipidemic apolipoprotein E-deficient (ApoE−/−) mice: they are organized into distinct immune cell compartments, including separate T-cell areas, activated B-cell follicles, and plasma cell niches. Analyses of ATLO immune cell subsets indicate antigen-specific T- and B-cell immune reactions within the atherosclerotic arterial wall adventitia. Moreover, ATLOs harbor innate immune cells, including a large component of inflammatory macrophages, B-1 cells, and an aberrant set of antigen-presenting cells. There is marked neoangiogenesis, irregular lymphangiogenesis, neoformation of high endothelial venules, and de novo synthesis of lymph node-like conduits. Molecular mechanisms of ATLO formation remain to be identified though media vascular smooth muscle cells may adopt features of lymphoid tissue organizer-like cells by expressing lymphorganogenic chemokines, i.e., CXCL13 and CCL21. Although these data are consistent with the view that ATLOs participate in primary T- and B-cell responses against elusive atherosclerosis-specific autoantigens, their specific protective or disease-promoting roles remain to be identified. In this review, we discuss what is currently known about ATLOs and their potential impact on atherosclerosis and make attempts to define challenges ahead. PMID:27777573

  10. Trends & Indicators: NE Universities Still R&D Powerhouses

    ERIC Educational Resources Information Center

    Harney, John O.

    2011-01-01

    New England universities performed more than $4 billion worth of research and development (R&D) in 2009, but the region's share of total R&D performed by all U.S. universities remained at 7.3%, down from more than 10% in the 1980s. The region's university research labs have been world-famous for ideas that breed companies and whole…

  11. 76 FR 7834 - Goshen Powerhouse, LLC; Notice of Declaration of Intention and Soliciting Comments, Protests, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-11

    ... filing may be viewed on the Web at http://www.ferc.gov using the ``eLibrary'' link. Enter the docket...)(iii) and the instructions on the Commission's Web site at http://www.ferc.gov/docs-filing/efiling.asp... spillway; (3) an existing 2-mile-long, 4-to-6-foot-deep, 50-to-200-foot-wide headrace canal; (4)...

  12. American Recovery and Reinvestment Act: North Fork Skokomish Powerhouse at Cushman No. 2 Dam

    SciTech Connect

    Fischer, Steve; McCarty, Patrick

    2013-09-30

    The objective of this project was to add generating capacity on an in-stream flow release at Tacoma Power's Cushman hydroelectric project, Cushman No. 2 Dam, FERC Project P-460. The flow that is being used to generate additional electricity was being discharged from a valve at the base of the dam without recovery of the energy. A second objective to the project was to incorporate upstream fish passage by use of a fish collection structure attached to the draft tubes of the hydroelectric units. This will enable reintroduction of native anadromous fish above the dams which have blocked fish passage since the late 1920's. The project was funded in part by the American Recovery and Reinvestment Act through the Department of Energy, Office of Energy, Efficiency and Renewable Energy, Wind and Water Power Program.

  13. Mitochondrial Chemical Biology: New Probes Elucidate the Secrets of the Powerhouse of the Cell.

    PubMed

    Wisnovsky, Simon; Lei, Eric K; Jean, Sae Rin; Kelley, Shana O

    2016-08-18

    Mitochondria are energy-producing organelles with essential functions in cell biology, and mitochondrial dysfunction is linked to a wide range of human diseases. Efforts to better understand mitochondrial biology have been limited by the lack of tools for manipulating and detecting processes occurring within the organelle. Here, we highlight recent significant advances in mitochondrial chemical biology that have produced new tools and techniques for studying mitochondria. Specifically, we focus on the development of chemical tools to perturb mitochondrial biochemistry, probes allowing precise measurement of mitochondrial function, and new techniques for high-throughput characterization of the mitochondrial proteome. Taken together, these advances in chemical biology will enable exciting new directions in mitochondrial research.

  14. Under-Stated Powerhouses: Scottish Independent Schools, Their Characteristics and Their Capitals

    ERIC Educational Resources Information Center

    Forbes, Joan; Weiner, Gaby

    2008-01-01

    This paper presents a study from the Scottish Independent School Project (SISP). The first part of the paper provides an overview of the characteristics of Scottish independent schools (e.g. location, structure, fees) with the aim of distinguishing the different orientations of schools in the sector. The second and main part of the paper is a…

  15. Cultivating Political Powerhouses: TFA Corps Members Experiences That Shape Local Political Engagement

    ERIC Educational Resources Information Center

    Jacobsen, Rebecca; White, Rachel; Reckhow, Sarah

    2016-01-01

    In recent years, Teach for America (TFA) has invested in developing corps members as leaders. Although TFA asks corps members for a two-year commitment, TFA celebrates the achievements of alumni who have gone on to careers in politics, public policy, and advocacy. Thus, many community leaders see the arrival of TFA corps members as having a…

  16. Chandra Discovers X-Ray Ring Around Cosmic Powerhouse in Crab Nebula

    NASA Astrophysics Data System (ADS)

    1999-09-01

    After barely two months in space, NASA's Chandra X-ray Observatory has taken a stunning image of the Crab Nebula, the spectacular remains of a stellar explosion, and has revealed something never seen before: a brilliant ring around the nebula's heart. Combined with observations from the Hubble Space Telescope, the image provides important clues to the puzzle of how the cosmic "generator," a pulsing neutron star, energizes the nebula, which still glows brightly almost 1,000 years after the explosion. "The inner ring is unique," said Professor Jeff Hester of Arizona State University, Tempe, AZ. "It has never been seen before, and it should tell us a lot about how the energy from the pulsar gets into the nebula. It's like finding the transmission lines between the power plant and the light bulb." Professor Mal Ruderman of Columbia University, New York, NY, agreed. "The X-rays Chandra sees are the best tracer of where the energy is. With images such as these, we can directly diagnose what is going on." What is going on, according to Dr. Martin Weisskopf, Chandra Project Scientist from NASA's Marshall Space Flight Center, Huntsville, AL, is awesome. "The Crab pulsar is accelerating particles up to the speed of light and flinging them out into interstellar space at an incredible rate." The image shows tilted rings or waves of high-energy particles that appear to have been flung outward over the distance of a light year from the central star, and high-energy jets of particles blasting away from the neutron star in a direction perpendicular to the spiral. Hubble Space Telescope images have shown moving knots and wisps around the neutron star, and previous X-ray images have shown the outer parts of the jet and hinted at the ring structure. With Chandra's exceptional resolution, the jet can be traced all the way in to the neutron star, and the ring pattern clearly appears. The image was made with Chandra's Advanced CCD Imaging Spectrometer and High Energy Transmission Grating. The Crab Nebula, easily the most intensively studied object beyond our solar system, is the remnant of a star that was observed to explode in 1054 A.D. Chinese astronomers in that year reported a "guest star" that appeared suddenly and remained visible for weeks, even during daytime. From gamma-ray telescopes to radio telescopes, the Crab has been observed using virtually every astronomical instrument that could see that part of the sky. Unraveling the mysteries of the Crab has proven to be the door to insight after insight into the workings of the universe. The Crab convincingly tied the origin of enigmatic "pulsars" to the stellar cataclysms known as supernovas. Observations of the expanding cloud of filaments in the Crab were instrumental in confirming the cosmic origin of the chemical elements from which planets (and people) are made. The nebula is located 6,000 light years from Earth in the constellation Taurus. The Crab pulsar, which was discovered by radio astronomers in 1968, is a neutron star rotating 30 times per second. Neutron stars are formed in the seconds before a supernova explosion when gravity crushes the central core of the star to densities 50 trillion times that of lead and a diameter of only 12 miles. Another consequence of the dramatic collapse is that neutron stars are rapidly rotating and highly magnetized. Like a gigantic cosmic generator, the rotating magnet generates 10 quadrillion volts of electricity, 30 million times that of a typical lightning bolt. "It is an incredibly efficient generator," Ruderman explained. "More than ninety-five percent efficient. There's nothing like it on Earth." Press: Fact Sheet To follow Chandra's progress, visit the Chandra News Web site at: http://chandra.harvard.edu AND http://chandra.nasa.gov NASA's Marshall Space Flight Center manages the Chandra program. TRW, Inc., Redondo Beach, CA, is the prime contractor for the spacecraft. The Smithsonian's Chandra X-ray Center controls science and flight operations from Cambridge, MA. High resolution digital versions of the X-ray image (300 dpi JPG, TIFF) and other information associated with this release are available on the Internet at: http://chandra.harvard.edu/photo/0052/index.html or via links in: http://chandra.harvard.edu An animation of a supernova explosion and the formation of a supernova remnant can be found at: http://chandra.harvard.edu/resources/animations/pulsar.html

  17. Splitting up the powerhouse: structural insights into the mechanism of mitochondrial fission.

    PubMed

    Richter, Viviane; Singh, Abeer P; Kvansakul, Marc; Ryan, Michael T; Osellame, Laura D

    2015-10-01

    Mitochondria are dynamic organelles whose shape is regulated by the opposing processes of fission and fusion, operating in conjunction with organelle distribution along the cytoskeleton. The importance of fission and fusion homeostasis has been highlighted by a number of disease states linked to mutations in proteins involved in regulating mitochondrial morphology, in addition to changes in mitochondrial dynamics in Alzheimer's, Huntington's and Parkinson's diseases. While a number of mitochondrial morphology proteins have been identified, how they co-ordinate to assemble the fission apparatus is not clear. In addition, while the master mediator of mitochondrial fission, dynamin-related protein 1, is conserved throughout evolution, the adaptor proteins involved in its mitochondrial recruitment are not. This review focuses on our current understanding of mitochondrial fission and the proteins that regulate this process in cell homeostasis, with a particular focus on the recent mechanistic insights based on protein structures.

  18. Blasting Damage Predictions by Numerical Modeling in Siahbishe Pumped Storage Powerhouse

    NASA Astrophysics Data System (ADS)

    Eslami, Majid; Goshtasbi, Kamran

    2017-04-01

    One of the popular methods of underground and surface excavations is the use of blasting. Throughout this method of excavation, the loading resulted from blasting can be affected by different geo-mechanical and structural parameters of rock mass. Several factors affect turbulence in underground structures some of which are explosion, vibration, and stress impulses caused by the neighbouring blasting products. In investigating the blasting mechanism one should address the processes which expand with time and cause seismic events. To protect the adjoining structures against any probable deconstruction or damage, it is very important to model the blasting process prior to any actual operation. Efforts have been taken in the present study to demonstrate the potentiality of numerical methods in predicting the specified parameters in order to prevent any probable destruction. For this purpose the blasting process was modeled, according to its natural implementation, in one of the tunnels of Siahbishe dam by the 3DEC and AUTODYN 3D codes. 3DEC was used for modeling the blasting environment as well as the blast holes and AUTODYN 3D for modeling the explosion process in the blast hole. In this process the output of AUTODYN 3D, which is a result of modeling the blast hole and is in the form of stress waves, is entered into 3DEC. For analyzing the amount of destruction made by the blasting operation, the key parameter of Peak Particle Velocity was used. In the end, the numerical modeling results have been compared with the data recorded by the seismographs planted through the tunnel. As the results indicated 3DEC and AUTODYN 3D proved appropriate for analyzing such an issue. Therefore, by means of these two softwares one can analyze explosion processes prior to their implementation and make close estimation of the damage resulting from these processes.

  19. Energy transfer in "parasitic" cancer metabolism: mitochondria are the powerhouse and Achilles' heel of tumor cells.

    PubMed

    Martinez-Outschoorn, Ubaldo E; Pestell, Richard G; Howell, Anthony; Tykocinski, Mark L; Nagajyothi, Fnu; Machado, Fabiana S; Tanowitz, Herbert B; Sotgia, Federica; Lisanti, Michael P

    2011-12-15

    It is now widely recognized that the tumor microenvironment promotes cancer cell growth and metastasis via changes in cytokine secretion and extracellular matrix remodeling. However, the role of tumor stromal cells in providing energy for epithelial cancer cell growth is a newly emerging paradigm. For example, we and others have recently proposed that tumor growth and metastasis is related to an energy imbalance. Host cells produce energy-rich nutrients via catabolism (through autophagy, mitophagy, and aerobic glycolysis), which are then transferred to cancer cells to fuel anabolic tumor growth. Stromal cell-derived L-lactate is taken up by cancer cells and is used for mitochondrial oxidative phosphorylation (OXPHOS) to produce ATP efficiently. However, "parasitic" energy transfer may be a more generalized mechanism in cancer biology than previously appreciated. Two recent papers in Science and Nature Medicine now show that lipolysis in host tissues also fuels tumor growth. These studies demonstrate that free fatty acids produced by host cell lipolysis are re-used via beta-oxidation (beta-OX) in cancer cell mitochondria. Thus, stromal catabolites (such as lactate, ketones, glutamine and free fatty acids) promote tumor growth by acting as high-energy onco-metabolites. As such, host catabolism, via autophagy, mitophagy and lipolysis, may explain the pathogenesis of cancer-associated cachexia and provides exciting new druggable targets for novel therapeutic interventions. Taken together, these findings also suggest that tumor cells promote their own growth and survival by behaving as a "parasitic organism." Hence, we propose the term "Parasitic Cancer Metabolism" to describe this type of metabolic coupling in tumors. Targeting tumor cell mitochondria (OXPHOS and beta-OX) would effectively uncouple tumor cells from their hosts, leading to their acute starvation. In this context, we discuss new evidence that high-energy onco-metabolites (produced by the stroma) can confer drug resistance. Importantly, this metabolic chemo-resistance is reversed by blocking OXPHOS in cancer cell mitochondria with drugs like Metformin, a mitochondrial "poison." In summary, parasitic cancer metabolism is achieved architecturally by dividing tumor tissue into at least two well-defined opposing "metabolic compartments:" catabolic and anabolic.

  20. Capturing the Biofuel Wellhead and Powerhouse: The Chloroplast and Mitochondrial Genomes of the Leguminous Feedstock Tree Pongamia pinnata

    PubMed Central

    Kazakoff, Stephen H.; Imelfort, Michael; Edwards, David; Koehorst, Jasper; Biswas, Bandana; Batley, Jacqueline; Scott, Paul T.; Gresshoff, Peter M.

    2012-01-01

    Pongamia pinnata (syn. Millettia pinnata) is a novel, fast-growing arboreal legume that bears prolific quantities of oil-rich seeds suitable for the production of biodiesel and aviation biofuel. Here, we have used Illumina® ‘Second Generation DNA Sequencing (2GS)’ and a new short-read de novo assembler, SaSSY, to assemble and annotate the Pongamia chloroplast (152,968 bp; cpDNA) and mitochondrial (425,718 bp; mtDNA) genomes. We also show that SaSSY can be used to accurately assemble 2GS data, by re-assembling the Lotus japonicus cpDNA and in the process assemble its mtDNA (380,861 bp). The Pongamia cpDNA contains 77 unique protein-coding genes and is almost 60% gene-dense. It contains a 50 kb inversion common to other legumes, as well as a novel 6.5 kb inversion that is responsible for the non-disruptive, re-orientation of five protein-coding genes. Additionally, two copies of an inverted repeat firmly place the species outside the subclade of the Fabaceae lacking the inverted repeat. The Pongamia and L. japonicus mtDNA contain just 33 and 31 unique protein-coding genes, respectively, and like other angiosperm mtDNA, have expanded intergenic and multiple repeat regions. Through comparative analysis with Vigna radiata we measured the average synonymous and non-synonymous divergence of all three legume mitochondrial (1.59% and 2.40%, respectively) and chloroplast (8.37% and 8.99%, respectively) protein-coding genes. Finally, we explored the relatedness of Pongamia within the Fabaceae and showed the utility of the organellar genome sequences by mapping transcriptomic data to identify up- and down-regulated stress-responsive gene candidates and confirm in silico predicted RNA editing sites. PMID:23272141

  1. Capturing the biofuel wellhead and powerhouse: the chloroplast and mitochondrial genomes of the leguminous feedstock tree Pongamia pinnata.

    PubMed

    Kazakoff, Stephen H; Imelfort, Michael; Edwards, David; Koehorst, Jasper; Biswas, Bandana; Batley, Jacqueline; Scott, Paul T; Gresshoff, Peter M

    2012-01-01

    Pongamia pinnata (syn. Millettia pinnata) is a novel, fast-growing arboreal legume that bears prolific quantities of oil-rich seeds suitable for the production of biodiesel and aviation biofuel. Here, we have used Illumina® 'Second Generation DNA Sequencing (2GS)' and a new short-read de novo assembler, SaSSY, to assemble and annotate the Pongamia chloroplast (152,968 bp; cpDNA) and mitochondrial (425,718 bp; mtDNA) genomes. We also show that SaSSY can be used to accurately assemble 2GS data, by re-assembling the Lotus japonicus cpDNA and in the process assemble its mtDNA (380,861 bp). The Pongamia cpDNA contains 77 unique protein-coding genes and is almost 60% gene-dense. It contains a 50 kb inversion common to other legumes, as well as a novel 6.5 kb inversion that is responsible for the non-disruptive, re-orientation of five protein-coding genes. Additionally, two copies of an inverted repeat firmly place the species outside the subclade of the Fabaceae lacking the inverted repeat. The Pongamia and L. japonicus mtDNA contain just 33 and 31 unique protein-coding genes, respectively, and like other angiosperm mtDNA, have expanded intergenic and multiple repeat regions. Through comparative analysis with Vigna radiata we measured the average synonymous and non-synonymous divergence of all three legume mitochondrial (1.59% and 2.40%, respectively) and chloroplast (8.37% and 8.99%, respectively) protein-coding genes. Finally, we explored the relatedness of Pongamia within the Fabaceae and showed the utility of the organellar genome sequences by mapping transcriptomic data to identify up- and down-regulated stress-responsive gene candidates and confirm in silico predicted RNA editing sites.

  2. Northeast and northwest elevations. View to south Flint Creek ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Northeast and northwest elevations. View to south - Flint Creek Hydroelectric Project, Powerhouse, Approximately 3 miles southeast of Porters Corner on Powerhouse Road, Philipsburg, Granite County, MT

  3. Detail of door on southeast elevation. View to northwest ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Detail of door on southeast elevation. View to northwest - Flint Creek Hydroelectric Project, Powerhouse, Approximately 3 miles southeast of Porters Corner on Powerhouse Road, Philipsburg, Granite County, MT

  4. Richard B. Russell Dam and Lake, Savannah River, Georgia and South Carolina Final Foundation Report, Concrete Dam, Embankments and Powerhouse. Volume 1. Text and Plates

    DTIC Science & Technology

    1989-10-03

    abuae of iron- and magnesiun.-rich minerals) rock, generally of fine to edita grain size. It is a metamorphosed diabase or basalt, and is referred to on...nata-diabsoe ad four repcesentative samples of mota-decite. The avierage value of the neta- diabase samples s 20,150 psi ad of the aeta-dacite samples...TABLE 6 SONIC VELOCITIES AND AVERAGE SCHMIDT REBOUND NUMBERS Hole no. Elev. Rock type Rebound no. Velocity C-127 315 Meta- diabase 51 19,600 C-129 292

  5. Evaluation of a Prototype Surface Flow Bypass for Juvenile Salmon and Steelhead at the Powerhouse of Lower Granite Dam, Snake River, Washington, 1996-2000

    SciTech Connect

    Johnson, Gary E.; Anglea, Steven M.; Adams, Noah S.; Wik, Timothy O.

    2005-02-28

    A surface flow bypass provides a route in the upper water column for naturally, surface-oriented juvenile salmonids to safely migrate through a hydroelectric dam. Surface flow bypasses were recommended in several regional salmon recovery plans as a means to increase passage survival of juvenile salmonids at Columbia and Snake River dams. A prototype surface flow bypass, called the SBC, was retrofit on Lower Granite Dam and evaluated from 1996 to 2000 using biotelemetry and hydroacoustic techniques. In terms of passage efficiency, the best SBC configurations were a surface skimmer (99 m3/s [3,500 cfs], three entrances 5 m wide, 5 m deep and one entrance 5 m wide, 15 m deep) and a single chute (99 m3/s, one entrance 5 m wide, 8.5 m deep). They each passed 62 ? 3% (95% confidence interval) of the total juvenile fish population that entered the section of the dam with the SBC entrances (Turbine Units 4-5). Smooth entrance shape and concentrated surface flow characteristics of these configurations are worth pursuing in designs for future surface flow bypasses. In addition, a guidance wall in the Lower Granite Dam forebay diverted the following percentages of juvenile salmonids away from Turbine Units 1-3 toward other passage routes, including the SBC: run-at-large 79 ? 18%; hatchery steelhead 86%; wild steelhead 65%; and yearling chinook salmon 66%. When used in combination with spill or turbine intake screens, a surface flow bypass with a guidance wall can produce a high level (> 90% of total project passage) of non-turbine passage and provide operational flexibility to fisheries managers and dam operators responsible for enhancing juvenile salmonid survival.

  6. Light-Emitting Tag Testing in Conjunction with Testing of the Minimum Gap Runner Turbine Design at Bonneville Dam Powerhouse 1

    SciTech Connect

    Carlson, Thomas J.; Weiland, Mark A.

    2001-01-30

    This report describes a pilot study conducted by Tom Carlson of PNNL and Mark Weiland of MEVATEC Corp to test the feasibility of using light-emitting tags to visually track objects passing through the turbine environment of a hydroelectric dam. Light sticks were released at the blade tip, mid-blade, and hub in the MGR turbine and a Kaplan turbine at Bonneville Dam and videotaped passing thru the dam to determine visibility and object trajectories.

  7. Evaluation of a Behavioral Guidance Structure at Bonneville Dam Second Powerhouse including Passage Survival of Juvenile Salmon and Steelhead using Acoustic Telemetry, 2008

    SciTech Connect

    Faber, Derrek M.; Ploskey, Gene R.; Weiland, Mark A.; Deng, Zhiqun; Hughes, James S.; McComas, Roy L.; Kim, Jina; Townsend, R. L.; Fu, Tao; Skalski, J. R.; Fischer, Eric S.

    2010-02-12

    Summarizes research conducted at Bonneville Dam in 2008 to evaluate a prototype Behavioral Guidance Structure, that was deployed by the US Army Corps of Engineers in an effort to increase survival of outmigrating smolts at Bonneville Dam.

  8. 17. Photocopy of photograph (original copy in Edison collection). Photographer ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. Photocopy of photograph (original copy in Edison collection). Photographer and date unknown, although probably taken before 1920. VIEW OF NORTH END OF TULE RIVER POWERHOUSE SHOWING POWERHOUSE AT PHOTO CENTER, TRANSFORMER BUILDING TO RIGHT OF POWERHOUSE, GARAGE TO LEFT OF POWERHOUSE, AND OPERATOR COTTAGE BEHIND POWERHOUSE AND TRANSFORMER HOUSE. VIEW TO SOUTHEAST. - Tule River Hydroelectric Project, Water Conveyance System, Middle Fork Tule River, Springville, Tulare County, CA

  9. 78 FR 60272 - Western Minnesota Municipal Power Authority; Notice of Preliminary Permit Application Accepted...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-01

    ... tailrace from the powerhouse to Lake Francis Case; (9) a new substation on top of the powerhouse containing... project substation to the existing Lake Platte substation (the point of interconnection); and (11...

  10. 10. DETAIL EXTERIOR VIEW OF SWITCHING EQUIPMENT AND METAL FRAME ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. DETAIL EXTERIOR VIEW OF SWITCHING EQUIPMENT AND METAL FRAME SUPPORT STRUCTURE ON ROOF OF POWERHOUSE #1. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  11. 62. photographer unknown undated ERECTING FORMS, PLACING REINFORCING STEEL, AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    62. photographer unknown undated ERECTING FORMS, PLACING REINFORCING STEEL, AND CONCRETING DRAFT PIER OF POWERHOUSE. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  12. 77 FR 26542 - Black Mountain Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-04

    ... transmission line running from the powerhouse to Sierra Pacific Power's Fort Churchill generating station... running from the powerhouse to the PDCI and then parallel to the PDCI to the Fort Churchill generating...

  13. 24. DETAIL INTERIOR VIEW OF GENERATOR BUS POTENTIAL FOR UNIT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    24. DETAIL INTERIOR VIEW OF GENERATOR BUS POTENTIAL FOR UNIT NO 1 IN BUS CELL GALLERY ON LEVEL +77 OF POWERHOUSE #1. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  14. 76 FR 51025 - Goat Lake Hydro, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-17

    ...- foot-long, above-ground penstock extending from the outlet of the intake tunnel to the powerhouse on... channel tailrace extending about 50 feet from the powerhouse to the Chilkoot River; (7) a 14-mile-long,...

  15. Overview of interior showing turbine (center) and transformer (left). View ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Overview of interior showing turbine (center) and transformer (left). View to north-northwest - Flint Creek Hydroelectric Project, Powerhouse, Approximately 3 miles southeast of Porters Corner on Powerhouse Road, Philipsburg, Granite County, MT

  16. Southwest and southeast elevations (left) and Employee Housing (right). View ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Southwest and southeast elevations (left) and Employee Housing (right). View to north - Flint Creek Hydroelectric Project, Powerhouse, Approximately 3 miles southeast of Porters Corner on Powerhouse Road, Philipsburg, Granite County, MT

  17. 27. GENERAL INTERIOR VIEW LOOKING DOWN THE LENGTH OF OIL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    27. GENERAL INTERIOR VIEW LOOKING DOWN THE LENGTH OF OIL CIRCUIT BREAKER GALLERY ON LEVEL +65 OF POWERHOUSE #1. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  18. 28. GENERAL DETAIL VIEW OF EQUIPMENT ON DOWNSTREAM SIDE OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    28. GENERAL DETAIL VIEW OF EQUIPMENT ON DOWNSTREAM SIDE OF OIL CIRCUIT BREAKER GALLERY ON LEVEL +65 OF POWERHOUSE #1. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  19. 43. GENERAL INTERIOR VIEW OF TURBINE/GENERATOR UNIT NO 1 ON ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    43. GENERAL INTERIOR VIEW OF TURBINE/GENERATOR UNIT NO 1 ON LEVEL +37 OF POWERHOUSE #1; COOLER PUMP IS VISIBLE IN CENTER/RIGHT. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  20. 46. DETAIL INTERIOR VIEW OF COOLER PUMP SERVING TURBINE/GENERATOR UNIT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    46. DETAIL INTERIOR VIEW OF COOLER PUMP SERVING TURBINE/GENERATOR UNIT NO 1 ON LEVEL +37 OF POWERHOUSE #1. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  1. View of governor, water wheel, generator #1 and exciter (west ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of governor, water wheel, generator #1 and exciter (west end of Childs Powerhouse). Looking southeast - Childs-Irving Hydroelectric Project, Childs System, Childs Powerhouse, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ

  2. View of east and south (rear) walls, water wheels and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of east and south (rear) walls, water wheels and generators, interior of Childs Powerhouse. Looking southeast - Childs-Irving Hydroelectric Project, Childs System, Childs Powerhouse, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ

  3. 12. DETAIL EXTERIOR VIEW OF FISH PASSAGE BETWEEN THE SOUTH ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. DETAIL EXTERIOR VIEW OF FISH PASSAGE BETWEEN THE SOUTH END OF POWERHOUSE #1 AND NAVIGATION LOCK #1. - Bonneville Project, Navigation Lock No. 1, Oregon shore of Columbia River near first Powerhouse, Bonneville, Multnomah County, OR

  4. 14. BREAKER 7 GENERATOR 20: A 7000 VOLT 1200 AMPERES ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. BREAKER 7 GENERATOR 20: A 7000 VOLT 1200 AMPERES BREAKER. IT WEIGHS 1630 POUNDS. (GENERATOR 20 IS LOCATED AT NEWHALEM POWERHOUSE BUT IS REMOTE CONTROLLED FROM GORGE POWERHOUSE.) 1989. - Skagit Power Development, Gorge Powerhouse, On Skagit River, 0.4 mile upstream from Newhalem, Newhalem, Whatcom County, WA

  5. 11. DETAIL EXTERIOR VIEW OF EQUIPMENT AND FISH LIFTS BETWEEN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. DETAIL EXTERIOR VIEW OF EQUIPMENT AND FISH LIFTS BETWEEN POWERHOUSE #1 AND NAVIGATION LOCK #1; VIEW IS TAKEN FROM ROOF OF POWERHOUSE #1. - Bonneville Project, Navigation Lock No. 1, Oregon shore of Columbia River near first Powerhouse, Bonneville, Multnomah County, OR

  6. Prevention of Human Mammary Carcinogenesis.

    DTIC Science & Technology

    1996-07-01

    efficacy of naturally-occurring compounds 13C, EPA, EGCG and GEN was evaluated by determining the down-regulation of the perturbed biomarkers. In the...cells with I3C, EGCG or GEN resulted in differential down-regulation of perturbed biomarkers. This study provides a clinically relevant experimental...naturally-occurring 12 tumor inhibitors 6. Effect of 13C on 184-B5/BP, 184-B5/HER and 13 MDA-MB-231 7. Effect of EGCG on 184-B5/HER 14 8. Effect of GEN on

  7. 7. William E. Barrett, Photographer, August 1975. LOG PONDS LOOKING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. William E. Barrett, Photographer, August 1975. LOG PONDS LOOKING WEST FROM POWERHOUSE ROOF. TRANSFORMER SHED IN FOREGROUND. - Meadow River Lumber Company, Highway 60, Rainelle, Greenbrier County, WV

  8. 18 CFR 381.302 - Petition for issuance of a declaratory order (except under Part I of the Federal Power Act.)

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... construction, operation, and maintenance of dams, water conduits, reservoirs, powerhouses, transmission lines, or other works for the development and improvement of navigation and for the development and...

  9. 9. FIRST FLOOR CAR BARN SPACE. VIEW TO NORTHWEST. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. FIRST FLOOR CAR BARN SPACE. VIEW TO NORTHWEST. - Commercial & Industrial Buildings, Key City Electric Street Railroad, Powerhouse & Storage Barn, Eighth & Washington Streets, Dubuque, Dubuque County, IA

  10. 10. COLUMN/BEAM CONNECTION DETAIL. VIEW TO NORTHWEST. Commercial & ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. COLUMN/BEAM CONNECTION DETAIL. VIEW TO NORTHWEST. - Commercial & Industrial Buildings, Key City Electric Street Railroad, Powerhouse & Storage Barn, Eighth & Washington Streets, Dubuque, Dubuque County, IA

  11. 19. Heat Pump, view to the southwest. This system provides ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. Heat Pump, view to the southwest. This system provides ventilation air heating and cooling throughout the powerhouse. - Washington Water Power Clark Fork River Noxon Rapids Hydroelectric Development, Powerhouse, South bank of Clark Fork River at Noxon Rapids, Noxon, Sanders County, MT

  12. 14. DETAIL EXTERIOR VIEW LOOKING WEST, SHOWING TRANSFORMER UNITS ON ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. DETAIL EXTERIOR VIEW LOOKING WEST, SHOWING TRANSFORMER UNITS ON THE UPSTREAM SIDE OF POWERHOUSE #1; THE THREE TRANSFORMERS SHOWN WORK IN CONCERT WITH ONE ANOTHER TO RAISE THE VOLTAGE OF THREE-PHASE ALTERNATING CURRENT PRODUCED BY THE GENERATORS. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  13. 1. Photocopy of photograph (original print located at Southern California ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Photocopy of photograph (original print located at Southern California Edison Company Corporate Offices, Rosemead, California). Photographer unknown, about 1920. EAST SIDE PLANT 6 POWERHOUSE AND TAILRACE. NOTE MISSION REVIVAL STYLE END-WALL PARAPET CAPS ON POWERHOUSE. VIEW TO WEST. - Bishop Creek Hydroelectric System, Plant 6, Bishop Creek, Bishop, Inyo County, CA

  14. 77 FR 11529 - Nushagak Electric and Telephone Cooperative, Inc.; Notice of Preliminary Permit Application...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-27

    ....75-MW Francis turbine/generator units; (5) a 40-foot-long, 20- foot-wide tailrace discharging flows from the powerhouse into Elva Creek; (6) a 49-mile-long, 34.5-kilovolt (kV) transmission line extending...-long, 20-foot-wide tailrace discharging flows from the powerhouse into Grant River; (8) a 46-mile-...

  15. 76 FR 12957 - City of Tacoma, Washington; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-09

    ...-kV distribution line owned by Tacoma Power. Water would enter the powerhouse from the second supply... turbine output to a 13.8-kV distribution line owned by Tacoma Power. Water would enter the powerhouse from... the Federal Power Act (FPA), proposing to study the feasibility of the Tacoma Water Supply...

  16. 21. GENERAL VIEW LOOKING WEST, SHOWING FISH LADDER ON BRADFORD ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    21. GENERAL VIEW LOOKING WEST, SHOWING FISH LADDER ON BRADFORD ISLAND THAT LEADS UP FROM POWERHOUSE #1 TOWARDS THE DAM/SPILLWAY; THE TOP OF POWERHOUSE #1 IS VISIBLE IN LEFT BACKGROUND. - Bonneville Project, Bonneville Dam, Columbia River, Bonneville, Multnomah County, OR

  17. 111. Photocopy of original construction drawing, dated 31 January 1935 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    111. Photocopy of original construction drawing, dated 31 January 1935 (Original print in the possession of U.S. Army Corps of Engineers, Portland District, Portland, OR.) (T-1-28) PROPOSED MODEL OF DIFFUSING CHAMBERS AND GRATINGS FOR POWERHOUSE FISHWAY AND FISH LADDERS. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  18. 77 FR 28865 - BMB Enterprises, Inc.; Notice of Application Accepted for Filing, Soliciting Motions To Intervene...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-16

    ... powerhouse containing two 325-kilowatt (kW) turbine generating units for a total installed capacity of 650 kW, the licensee proposes to construct a new powerhouse containing two 350-kW and two 330-kW turbine generating units for a total installed capacity of 1,360 kW. The hydraulic capacity of the project would...

  19. 106. Photocopy of original construction drawing, dated 7 December 1934 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    106. Photocopy of original construction drawing, dated 7 December 1934 (Original print in the possession of U.S. Army Corps of Engineers, Portland District, Portland, OR.) (P-5-311) POWERHOUSE, 60,000 H.P DRAFT TUBE DESIGN. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  20. 76 FR 48843 - Cottonwood Hydro, LLC; Notice of Petition for Declaratory Order and Soliciting Comments, Protests...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-09

    ...-diameter steel penstock; (2) a single-story reinforced concrete powerhouse, containing a 261-kW turbine... concrete weir, directing water into a 5,341-foot-long 24-28-inch-diameter steel penstock; (2) a two-story reinforced concrete and masonry powerhouse, containing an 850-kW turbine/generator; (3) a tailrace...

  1. 75 FR 71427 - Clean River Power 12, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-23

    ... consist of the following: (1) A 100-foot- long, 8-foot-high, reinforced concrete diversion weir on Ruth Creek; (2) a 45-foot-long, 15-foot-wide, 12-foot-high reinforced concrete intake structure adjacent to... powerhouse; (5) a 60-foot-long, 40-foot-wide reinforced concrete powerhouse containing one horizontal...

  2. 20. DETAIL INTERIOR VIEW OF STATION SERVICE CONTROLS IN CONTROL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. DETAIL INTERIOR VIEW OF STATION SERVICE CONTROLS IN CONTROL ROOM ON LEVEL +77 OF POWERHOUSE #1; THESE CONTROLS ARE TO THE LEFT OF THE ORIGINAL OPERATOR DESK. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  3. 17. DETAIL INTERIOR VIEW OF CONTROL ROOM ON LEVEL +77 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. DETAIL INTERIOR VIEW OF CONTROL ROOM ON LEVEL +77 OF POWERHOUSE #1; NOTEBOOKS IN FOREGROUND ARE ON TOP OF THE NEW SWITCH GEAR CONTROL CONSOLE; THE ORIGINAL OPERATOR DESK IS IN CENTER; THE ORIGINAL BENCH BOARD CONTROLS ARE IN BACKGROUND. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  4. 21. DETAIL INTERIOR VIEW OF ORIGINAL BENCH BOARD CONTROLS IN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    21. DETAIL INTERIOR VIEW OF ORIGINAL BENCH BOARD CONTROLS IN CONTROL ROOM ON LEVEL +77 OF POWERHOUSE #1; THESE PANELS ARE ON LEFT SIDE OF BENCH BOARD CONTROLS. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  5. 18. DETAIL INTERIOR VIEW OF CONTROL ROOM ON LEVEL +77 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. DETAIL INTERIOR VIEW OF CONTROL ROOM ON LEVEL +77 OF POWERHOUSE #1; ORIGINAL OPERATOR DESK IS IN CENTER FOREGROUND; NEW SWITCH GEAR CONTROL CONSOLE IS IN RIGHT BACKGROUND; GRAPHIC INSTRUMENT BOARD IS IN LEFT BACKGROUND. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  6. 20. DETAIL TO NORTH OF EXCITER 1 (LEFT), AND UNIT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. DETAIL TO NORTH OF EXCITER 1 (LEFT), AND UNIT 1 GATE VALVE CONTROL (LEFT CENTER), GOVERNOR (CENTER), AND GENERATOR (RIGHT CENTER), OLD POWERHOUSE GENERATOR FLOOR - Trenton Falls Hydroelectric Station, Powerhouse & Substation, On west bank of West Canada Creek, along Trenton Falls Road, 1.25 miles north of New York Route 28, Trenton Falls, Oneida County, NY

  7. 21. DETAIL TO SOUTHWEST OF HORIZONTAL EXCITER GENERATOR (LEFT) DRIVEN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    21. DETAIL TO SOUTHWEST OF HORIZONTAL EXCITER GENERATOR (LEFT) DRIVEN BY DOUBLE-RUNNER PELTON WHEEL (RIGHT), FORMER OLD POWERHOUSE GENERATOR FLOOR - Trenton Falls Hydroelectric Station, Powerhouse & Substation, On west bank of West Canada Creek, along Trenton Falls Road, 1.25 miles north of New York Route 28, Trenton Falls, Oneida County, NY

  8. 11. VIEW NORTH OF MACHINE SHOP IN BASEMENT OF OLD ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. VIEW NORTH OF MACHINE SHOP IN BASEMENT OF OLD POWERHOUSE, WITH PIPECUTTER (LEFT), DRILL PRESS LEFT (CENTER), AND GRINDER (RIGHT CENTER) BENEATH LINE SHAFTING) - Trenton Falls Hydroelectric Station, Powerhouse & Substation, On west bank of West Canada Creek, along Trenton Falls Road, 1.25 miles north of New York Route 28, Trenton Falls, Oneida County, NY

  9. 77 FR 10502 - Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-22

    ... Franklin D. Roosevelt Lake (Roosevelt Lake), near the town of Grand Coulee, Douglas and Grant Counties... units in the powerhouse; (3) an underground powerhouse containing four reversible turbine/generator... of the following new facilities: (1) A new 312-acre upper reservoir constructed approximately 3,000...

  10. 78 FR 7774 - Alaska Electric Light and Power Company; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-04

    ... diversion dam at an elevation of 620 feet above mean sea level; (2) an overflow spillway; (3) a 4,750-foot-long, 36-inch-diameter penstock; (4) a powerhouse containing a single, 3.3- megawatt generating unit... the powerhouse, consisting of a single 3.5-megavolt-ampere (MVA) transformer to adjust voltage to 23...

  11. 5. UPSTREAM VIEW OF THE TRASH RAKES, GATES AND GATELIFTING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. UPSTREAM VIEW OF THE TRASH RAKES, GATES AND GATE-LIFTING MECHANISMS FOR THE POST FALLS DAM AND POWERHOUSE, LOOKING NORTHWEST. - Washington Water Power Company Post Falls Power Plant, Middle Channel Powerhouse & Dam, West of intersection of Spokane & Fourth Streets, Post Falls, Kootenai County, ID

  12. 10. CLOSEUP VIEW OF THE TRASH RAKES, THEIR LIFTING MECHANISM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. CLOSE-UP VIEW OF THE TRASH RAKES, THEIR LIFTING MECHANISM (RIGHT FOREGROUND), AND CLUTCHES THAT OPEN AND CLOSE THE SIX INTAKE GATES ON THE POST FALLS POWERHOUSE, LOOKING WEST. - Washington Water Power Company Post Falls Power Plant, Middle Channel Powerhouse & Dam, West of intersection of Spokane & Fourth Streets, Post Falls, Kootenai County, ID

  13. 19. DETAIL TO SOUTHEAST OF EXCITER 1 GIRARD TURBINE, SHOWING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. DETAIL TO SOUTHEAST OF EXCITER 1 GIRARD TURBINE, SHOWING BEVEL-GEARED REGISTER GATE CONTROLS, OLD POWERHOUSE BASEMENT - Trenton Falls Hydroelectric Station, Powerhouse & Substation, On west bank of West Canada Creek, along Trenton Falls Road, 1.25 miles north of New York Route 28, Trenton Falls, Oneida County, NY

  14. 19. Photocopy of photograph showing framing of concrete walls of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. Photocopy of photograph showing framing of concrete walls of South Bank Substation, 18 July 1939 (from the BPA Photo Archives, Negative No. 365), LOOKING NORTHWEST WITH THE BONNEVILLE DAM POWERHOUSE IN BACKGROUND - Bonneville Power Administration South Bank Substation, I-84, South of Bonneville Dam Powerhouse, Bonneville, Multnomah County, OR

  15. 18. Photocopy of photograph showing foundation framing of South Bank ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. Photocopy of photograph showing foundation framing of South Bank Substation, 11 June 1939 (from the BPA Photo Archives, Negative No. 347), LOOKING NORTH WITH THE BONNEVILLE DAM POWERHOUSE IN BACKGROUND - Bonneville Power Administration South Bank Substation, I-84, South of Bonneville Dam Powerhouse, Bonneville, Multnomah County, OR

  16. 20. Photocopy of photograph showing the completed South Bank Substation, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. Photocopy of photograph showing the completed South Bank Substation, 4 November 1939 (from the BPA Photo Archives, Negative No. 6556), LOOKING NORTHWEST WITH THE BONNEVILLE DAM POWERHOUSE AND TRANSMISSION TOWERS IN BACKGROUND - Bonneville Power Administration South Bank Substation, I-84, South of Bonneville Dam Powerhouse, Bonneville, Multnomah County, OR

  17. 15. GENERAL EXTERIOR VIEW LOOKING SOUTH, SHOWING THE UPSTREAM FACADE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. GENERAL EXTERIOR VIEW LOOKING SOUTH, SHOWING THE UPSTREAM FACADE OF POWERHOUSE #1; TRANSFORMERS ARE VISIBLE ON THE RIGHT, THE GANTRY CRANE IS LEFT/CENTER, AND SWITCHING EQUIPMENT IS ON TOP OF BUILDING. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  18. 6. UPSTREAM VIEW OF THE SPILLWAY OF THE POST FALLS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. UPSTREAM VIEW OF THE SPILLWAY OF THE POST FALLS POWERHOUSE, WITH A PARTIAL VIEW OF THE MODERN TRANSFORMER IN THE FOREGROUND, AND THE OLD SWITCHING BUILDING IN THE LEFT BACKGROUND, LOOKING SOUTHEAST. - Washington Water Power Company Post Falls Power Plant, Middle Channel Powerhouse & Dam, West of intersection of Spokane & Fourth Streets, Post Falls, Kootenai County, ID

  19. 8. LEFT FACADE VIEW OF THE OLD SWITCHING BUILDING, WITH ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. LEFT FACADE VIEW OF THE OLD SWITCHING BUILDING, WITH THE POWERHOUSE AND DAM IN LEFT BACKGROUND, LOOKING NORTHWEST. - Washington Water Power Company Post Falls Power Plant, Middle Channel Powerhouse & Dam, West of intersection of Spokane & Fourth Streets, Post Falls, Kootenai County, ID

  20. 29. DETAIL INTERIOR VIEW OF EQUIPMENT IN SOUTH BANK FEEDER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    29. DETAIL INTERIOR VIEW OF EQUIPMENT IN SOUTH BANK FEEDER CABLE NO 1 ON UPSTREAM SIDE OF OIL CIRCUIT BREAKER GALLERY ON LEVEL +65 OF POWERHOUSE #1. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  1. 1. Sheeler redact: Lower east/west conveyor from wharf carried coke ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Sheeler redact: Lower east/west conveyor from wharf carried coke to highline for blast furnaces; upper south/north conveyor carried coal to GG; double window carried coal to powerhouse pulverizer building for powerhouse in background. Looking north/northeast - Rouge Steel Company, 3001 Miller Road, Dearborn, MI

  2. 76 FR 74782 - City of Escondido Vista Irrigation District; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-01

    ... application for surrender of license for the Escondido Hydroelectric Project, currently located on the San Luis Rey River. The Bear Valley Powerhouse Project is part of the existing Escondido Hydroelectric... the Bear Valley Powerhouse Project and granting the surrender of the Escondido ] Hydroelectric...

  3. 34. DETAIL INTERIOR VIEW OF MACHINE SHOP ON LEVEL +55 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    34. DETAIL INTERIOR VIEW OF MACHINE SHOP ON LEVEL +55 OF POWERHOUSE #1; CARLTON MACHINE TOOL CO DRILL IS IN LEFT FOREGROUND; SUDBURY MACHINE TOOL CO LATHES ARE IN BACKGROUND. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  4. View of water wheel, generator #3 and exciter (at east ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of water wheel, generator #3 and exciter (at east end of Childs Powerhouse) on a single shaft. In foreground the governor and shut-off valve are visible. Looking southwest - Childs-Irving Hydroelectric Project, Childs System, Childs Powerhouse, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ

  5. 15. DETAIL INTERIOR VIEW OF CONTROL HOUSE FOR NAVIGATION LOCK ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. DETAIL INTERIOR VIEW OF CONTROL HOUSE FOR NAVIGATION LOCK #1. Photograph Nos. OR-11-D-16 through OR-11-D-27 are photocopies of photographs. Original historic photographs are located at the Bonneville Powerhouse, Bonneville, Oregon. - Bonneville Project, Navigation Lock No. 1, Oregon shore of Columbia River near first Powerhouse, Bonneville, Multnomah County, OR

  6. 14. DETAIL EXTERIOR VIEW LOOKING NORTHWEST, SHOWING CONTROL HOUSE AT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. DETAIL EXTERIOR VIEW LOOKING NORTHWEST, SHOWING CONTROL HOUSE AT UPSTREAM END OF NAVIGATION LOCK #1; POWERHOUSE #1 IS PARTIALLY VISIBLE IN BACKGROUND. - Bonneville Project, Navigation Lock No. 1, Oregon shore of Columbia River near first Powerhouse, Bonneville, Multnomah County, OR

  7. 13. DETAIL EXTERIOR VIEW LOOKING NORTH, SHOWING TOP OF MITER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. DETAIL EXTERIOR VIEW LOOKING NORTH, SHOWING TOP OF MITER GATES AT DOWNSTREAM END OF NAVIGATION LOCK #1; POWERHOUSE #1 IS VISIBLE IN BACKGROUND. - Bonneville Project, Navigation Lock No. 1, Oregon shore of Columbia River near first Powerhouse, Bonneville, Multnomah County, OR

  8. 1. GENERAL EXTERIOR VIEW LOOKING SOUTHWEST, SHOWING DOWNSTREAM END OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. GENERAL EXTERIOR VIEW LOOKING SOUTHWEST, SHOWING DOWNSTREAM END OF NAVIGATION LOCK #1 WITH CHAMBER FILLED; THE CONTROL HOUSE IS ON RIGHT; VIEW IS TAKEN FROM ROOF OF POWERHOUSE #1. - Bonneville Project, Navigation Lock No. 1, Oregon shore of Columbia River near first Powerhouse, Bonneville, Multnomah County, OR

  9. 8. GENERAL EXTERIOR VIEW LOOKING NORTHWEST TOWARD UPSTREAM END OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. GENERAL EXTERIOR VIEW LOOKING NORTHWEST TOWARD UPSTREAM END OF NAVIGATION LOCK #1; SOUTH END OF POWERHOUSE #1 IS VISIBLE ON RIGHT; BRADFORD SLOUGH IS VISIBLE IN FOREGROUND. - Bonneville Project, Navigation Lock No. 1, Oregon shore of Columbia River near first Powerhouse, Bonneville, Multnomah County, OR

  10. 78 FR 26345 - York Haven Power Company, LLC; Notice of Application Accepted for Filing, Soliciting Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-06

    ... nature-like fishway to enhance fish passage facilities at the project. No other new developments or... headrace wall, main dam, east channel dam, powerhouse, and forebay bulkhead. The stone masonry headrace... feet, directs flow to the powerhouse. The main dam is attached to the north end of the headrace where...

  11. Concrete dam on the Bratsk hydroelectric station

    SciTech Connect

    Solov'eva, Z.I.

    1988-07-01

    The Bratsk concrete dam was designed and constructed with a sufficient degree of reliability. Settlement of the dam together with the powerhouse developed uniformly under the entire foundation. Two irreversible processes causing aging of the dam have been established by operating observations: leaching of the concrete and decompression of the contact zone of the foundation near the upstream face of the powerhouse sections. The decompression is due to the fact that the powerhouse sections are lighter than the spillway sections. At the present level this process can only be slowed by the combined use of grouting and drainage unloading.

  12. Hydroacoustic Assessment of Downstream Migrating Salmonids at Lower Monumental Dam in Spring, 1985 Final Report.

    SciTech Connect

    Johnson, Ward R.

    1985-12-01

    The primary objective of this study was to estimate the effectiveness of the spillway in passing migrants, with the spillway operating per the criteria identified in the COE's 1985 Juvenile Fish Passage Plan. Specific study objectives were to estimate: (1) the effectiveness of the spillway for Passing migrants; (2) die1 variability in passage rates of migrants through the powerhouse and the spillway; (3) the daily and cumulative run timing of migrant passage; (4) the proportions of migrants that passed through each turbine intake and spill bay (i.e., the horizontal distributions across the powerhouse and the spillway); and (5) the vertical distributions of migrants approaching the powerhouse and spillway.

  13. 12. Sewage Ejector Pumps, view to the southwest. These pumps ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. Sewage Ejector Pumps, view to the southwest. These pumps are connected to sewage treatment tanks. - Washington Water Power Clark Fork River Cabinet Gorge Hydroelectric Development, Powerhouse, North Bank of Clark Fork River at Cabinet Gorge, Cabinet, Bonner County, ID

  14. Overview of transformer platform showing three original stepup transformer (center), ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Overview of transformer platform showing three original step-up transformer (center), steel switchback (right), and modern step-down transformer (foreground), view to northwest - Morony Hydroelectric Facility, Dam and Powerhouse, Morony Dam Road, Great Falls, Cascade County, MT

  15. 13. DETAIL OF RAIL SHOWING SIMILARITY OF DESIGN BETWEEN THE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. DETAIL OF RAIL SHOWING SIMILARITY OF DESIGN BETWEEN THE GOTHIC OPENINGS IN THE RAIL AND THE WINDOWS OF THE POWERHOUSE, VIEW NORTH - Menominee River Bridge, Spanning Menominee River at County Truck Higway "K", Amberg, Marinette County, WI

  16. 23. A typical 107 Retention Basin, in this case in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    23. A typical 107 Retention Basin, in this case in the 100-F Area in February 1945. The Columbia River is in the background and the 184 Powerhouse is at the left. P-8458 - B Reactor, Richland, Benton County, WA

  17. 75 FR 20988 - City of Sandpoint; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-22

    ... running from the dam to the water treatment plant will act as the project's penstock; (4) a powerhouse next to the water treatment plant containing a Pelton turbine and a 65-kilowatt generator; and...

  18. 80. VIEW OF PLACING WHEELS IN SHAFT OF NO. 2 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    80. VIEW OF PLACING WHEELS IN SHAFT OF NO. 2 UNIT IN POSITION. OVERVIEW LOOKING EAST IN THE POWERHOUSE, Print No. 234, April 1904 - Electron Hydroelectric Project, Along Puyallup River, Electron, Pierce County, WA

  19. 76 FR 71961 - KC Hydro LLC of New Hampshire; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-21

    ... newly constructed powerhouse; (4) new electrical generating equipment with total hydraulic capacity of.../docs-filing/elibrary.asp . Enter the docket number (P-14246-000) in the docket number field to access...

  20. 76 FR 71962 - KC Hydo LLC of New Hampshire; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-21

    ... elevation of 474.5 feet mean sea level ] (MSL); (3) a newly constructed powerhouse; (4) new electrical... . Enter the docket number (P-14245-000) in the docket number field to access the document. For assistance...

  1. 64. Credit JTL. West and south elevations from across South ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    64. Credit JTL. West and south elevations from across South Battle Creek. Note penstock descending hill in background and new powerhouse construction in foreground. - Battle Creek Hydroelectric System, Battle Creek & Tributaries, Red Bluff, Tehama County, CA

  2. 57. Credit LRC. West elevation during construction. Note narrowgauge railroad ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    57. Credit LRC. West elevation during construction. Note narrow-gauge railroad entering main door of powerhouse. Photo c. 1910. - Battle Creek Hydroelectric System, Battle Creek & Tributaries, Red Bluff, Tehama County, CA

  3. 17. GENERAL EXTERIOR VIEW LOOKING NORTHEAST, SHOWING FISH LADDER ON ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. GENERAL EXTERIOR VIEW LOOKING NORTHEAST, SHOWING FISH LADDER ON BRADFORD ISLAND; VIEW IS TAKEN FROM ROOF OF POWERHOUSE #1; THE DAM/SPILLWAY IS IN RIGHT BACKGROUND. - Bonneville Project, Bonneville Dam, Columbia River, Bonneville, Multnomah County, OR

  4. 14. DETAILS OF GATE OPERATING MECHANISM, SHOWING RACK SECTION, CUT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. DETAILS OF GATE OPERATING MECHANISM, SHOWING RACK SECTION, CUT TEETH, CAST TEETH, GATE PINION (1907) - Nine Mile Hydroelectric Development, Powerhouse, State Highway 291 along Spokane River, Nine Mile Falls, Spokane County, WA

  5. CLOSEUP VIEW OF THE SWITCHYARD TERMINALS AND THE WEST ELEVATION ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CLOSE-UP VIEW OF THE SWITCHYARD TERMINALS AND THE WEST ELEVATION OF THE POWERHOUSE. - Wilson Dam & Hydroelectric Plant, Spanning Tennessee River at Wilson Dam Road (Route 133), Muscle Shoals, Colbert County, AL

  6. VIEW LOOKING SOUTHEAST AT ROUTE 133, SHOWING A CORNER DETAIL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW LOOKING SOUTHEAST AT ROUTE 133, SHOWING A CORNER DETAIL OF THE POWERHOUSE AND A SECTION OF THE SWITCHYARD. - Wilson Dam & Hydroelectric Plant, Spanning Tennessee River at Wilson Dam Road (Route 133), Muscle Shoals, Colbert County, AL

  7. VIEW LOOKING EAST SHOWING THE SWITCHYARD AND THE WEST ELEVATION ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW LOOKING EAST SHOWING THE SWITCHYARD AND THE WEST ELEVATION OF THE POWERHOUSE. - Wilson Dam & Hydroelectric Plant, Spanning Tennessee River at Wilson Dam Road (Route 133), Muscle Shoals, Colbert County, AL

  8. 16. GENERAL EXTERIOR VIEW LOOKING NORTHWEST, SHOWING TRANSMISSION TOWERS ON ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. GENERAL EXTERIOR VIEW LOOKING NORTHWEST, SHOWING TRANSMISSION TOWERS ON WEST END OF BRADFORD ISLAND; BRADFORD SLOUGH DOWNSTREAM FROM POWERHOUSE #1 IS IN FOREGROUND. - Bonneville Project, Bonneville Dam, Columbia River, Bonneville, Multnomah County, OR

  9. Interior hallway at 1250 Gallery, Block 11, which leads from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Interior hallway at 1250 Gallery, Block 11, which leads from Left Powerhouse to Pump-Generating Plant, looking southwest. - Columbia Basin Project, Grand Coulee Dam Powerplant Complex, Grand Coulee, Grant County, WA

  10. Interior hallway, at 1250 Gallery, showing entrance into PumpGenerating Plant ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Interior hallway, at 1250 Gallery, showing entrance into Pump-Generating Plant from Left Powerhouse, looking southwest. - Columbia Basin Project, Grand Coulee Dam Powerplant Complex, Grand Coulee, Grant County, WA

  11. VIEW OF TENNESSEE COAL & IRON (TCI) U.S. STEEL, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW OF TENNESSEE COAL & IRON (TCI) - U.S. STEEL, ENSLEY RAIL MILL SITE. POWERHOUSE IN LEFT BACKGROUND, MIXER IN RIGHT FOREGROUND. - Tennessee Coal & Iron Company, Ensley Works, West of residential & commercial districts, Birmingham, Jefferson County, AL

  12. 76 FR 28219 - Uniontown Hydro, LLC, Newburgh Hydro, LLC; Notice of Applications Tendered for Filing With the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-16

    ...-foot-wide powerhouse and inlet containing four Kaplan turbine-generators, with an installed capacity of... Kaplan turbine-generators, with an installed capacity of 13.0 MW each for a total plant capacity of 65.0...

  13. 17. DINING ROOM INTERIOR SHOWING GROUP OF THREE 1 LIGHT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. DINING ROOM INTERIOR SHOWING GROUP OF THREE 1 LIGHT OVER 1 LIGHT WINDOWS, AND DOORWAY INTO KITCHEN. VIEW TO EAST. - Big Creek Hydroelectric System, Powerhouse 8, Operator Cottage, Big Creek, Big Creek, Fresno County, CA

  14. 30. BEDROOM #3 INTERIOR SHOWING 1 LIGHT OVER 1 LIGHT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    30. BEDROOM #3 INTERIOR SHOWING 1 LIGHT OVER 1 LIGHT WINDOW ON EAST WALL AND PARTIALLY OPENED DOOR TO WINDOWED CLOSET. VIEW TO EAST. - Big Creek Hydroelectric System, Powerhouse 8, Operator Cottage, Big Creek, Big Creek, Fresno County, CA

  15. 37. SAR2, SHOWING OIL CIRCUIT BREAKERS (ABOVE) AND GENERATOR FIELD ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. SAR-2, SHOWING OIL CIRCUIT BREAKERS (ABOVE) AND GENERATOR FIELD COIL CONTROL RHEOSTATS (BELOW). SCE negative no. 10331, November 1, 1923. Photograph by G. Haven Bishop. - Santa Ana River Hydroelectric System, SAR-2 Powerhouse, Redlands, San Bernardino County, CA

  16. 22. ASSEMBLY OF 9700 H.P. ALLIS CHALMERS TURBINE, CENTERVILLE P.H. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    22. ASSEMBLY OF 9700 H.P. ALLIS CHALMERS TURBINE, CENTERVILLE P.H. Drawing no. 50153, traced from Allis Chalmers drawing #699, April 24, 1906. - Centerville Hydroelectric System, Powerhouse, Butte Creek, Centerville, Butte County, CA

  17. 11. INTERIOR VIEW OF WEST WALL SHOWING GENERATING UNITS, WITH ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. INTERIOR VIEW OF WEST WALL SHOWING GENERATING UNITS, WITH HOISTING CRANE AND CRANE TRACK AT TOP LEFT. VIEW TO SOUTH. - Cooke Hydroelectric Plant, Powerhouse, Cook Dam Road at Au Sable River, Oscoda, Iosco County, MI

  18. 22. Fire Protection Water Pump (low pressure), view to the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    22. Fire Protection Water Pump (low pressure), view to the southwest. - Washington Water Power Clark Fork River Cabinet Gorge Hydroelectric Development, Powerhouse, North Bank of Clark Fork River at Cabinet Gorge, Cabinet, Bonner County, ID

  19. TRANSMISSION TOWERS WITH LIGHTENING ARRESTORS ON HILL NORTH OF ELWHA ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    TRANSMISSION TOWERS WITH LIGHTENING ARRESTORS ON HILL NORTH OF ELWHA POWERHOUSE. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Elwha Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA

  20. VIEW OF PENSTOCK AND SURGE TANK LEADING INTO SOUTH SIDE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW OF PENSTOCK AND SURGE TANK LEADING INTO SOUTH SIDE OF ELWHA POWERHOUSE. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Elwha Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA

  1. GENERAL VIEW TO SOUTH OF WESTBANK SPILLWAY, PENSTOCK, SURGE TANK, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    GENERAL VIEW TO SOUTH OF WEST-BANK SPILLWAY, PENSTOCK, SURGE TANK, AND ELWHA POWERHOUSE. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Elwha Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA

  2. GENERAL AERIAL VIEW OF LAKE ALDWELL AND ELWHA DAM AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    GENERAL AERIAL VIEW OF LAKE ALDWELL AND ELWHA DAM AND POWERHOUSE, WITH STRAIT OF JUAN DE FUCA TO THE NORTH. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Elwha Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA

  3. FRONTAL VIEW OF SLATE SWITCHBOARD IN THE CONTROL ROOM OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FRONTAL VIEW OF SLATE SWITCHBOARD IN THE CONTROL ROOM OF ELWHA POWERHOUSE. PHOTO BY JET LOWE, HAER, 1995 - Elwha River Hydroelectric System, Elwha Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA

  4. VIEW TO EAST FROM HILLTOP: SURGE TANK AND TRANSFORMER YARD, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW TO EAST FROM HILLTOP: SURGE TANK AND TRANSFORMER YARD, WITH POWERHOUSE AND RIVER BELOW. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Glines Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA

  5. VIEW OF DCEXCITER AND GENERATORFIELD SLATE SWITCHBOARD IN CONTROL ROOM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW OF DC-EXCITER AND GENERATOR-FIELD SLATE SWITCHBOARD IN CONTROL ROOM OF ELWHA POWERHOUSE. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Elwha Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA

  6. VIEW OF SURGE TANK AND TRANSFORMER YARD FROM HILL ABOVE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW OF SURGE TANK AND TRANSFORMER YARD FROM HILL ABOVE POWERHOUSE. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Glines Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA

  7. 15. VIEW SOUTHEAST OF HYDROELECTRIC GENERATING FACILITY SHOWING TURBINE PIT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. VIEW SOUTHEAST OF HYDROELECTRIC GENERATING FACILITY SHOWING TURBINE PIT TO RIGHT AND POWERHOUSE TO LEFT - Middle Creek Hydroelectric Dam, On Middle Creek, West of U.S. Route 15, 3 miles South of Selinsgrove, Selinsgrove, Snyder County, PA

  8. GENERAL AERIAL VIEW OF NORTH END OF LAKE ALDWELL (RESERVOIR) ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    GENERAL AERIAL VIEW OF NORTH END OF LAKE ALDWELL (RESERVOIR) WITH ELWHA DAM AND POWERHOUSE. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Elwha Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA

  9. 6600 V GENERATOROIL CIRCUIT BREAKER WITH DISCONNECTS AND COPPER BUSS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6600 V GENERATOR-OIL CIRCUIT BREAKER WITH DISCONNECTS AND COPPER BUSS IN GLINES POWERHOUSE. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Glines Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA

  10. VIEW TO SOUTHWEST OF PENSTOCK AND SURGE TANK ABOVE GLINES ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW TO SOUTHWEST OF PENSTOCK AND SURGE TANK ABOVE GLINES POWERHOUSE. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Glines Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA

  11. ORIGINAL 1912 STATION POWER TRANSFORMERS IN HIGHTENSION ROOM, SW CORNER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ORIGINAL 1912 STATION POWER TRANSFORMERS IN HIGH-TENSION ROOM, SW CORNER OF THE POWERHOUSE. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Elwha Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA

  12. 19. Credit Pelton Water Wheel Company. Photocopy of drawing (perspective) ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. Credit Pelton Water Wheel Company. Photocopy of drawing (perspective) showing layout of powerhouse in 1901. (Pelton Water Wheel Company, Catalog, 11th ed., 1909, p. 75). - Battle Creek Hydroelectric System, Battle Creek & Tributaries, Red Bluff, Tehama County, CA

  13. Survival estimates of migrant juvenile salmonids through Bonneville Dam using radio telemetry, 2005

    USGS Publications Warehouse

    Counihan, Timothy D.; Hardiman, Jill M.; Walker, Chris; Puls, Amy; Holmberg , Glen

    2006-01-01

    During 2005, we evaluated the survival of radio-tagged yearling and subyearling Chinook salmon and steelhead trout through the Bonneville Dam spillway, powerhouses 1 and 2, the corner collector and juvenile bypass system (JBS) at powerhouse 2, and through all routes collectively using the route-specific survival model. Radio-tagged fish were released at The Dalles Dam and in the tailrace of Bonneville Dam and were interrogated at Bonneville Dam and three radio-telemetry arrays below Bonneville Dam. We also evaluated the survival of radio-tagged yearling and subyearling Chinook salmon and steelhead trout using paired releases through the ice and trash sluiceway at Bonneville Dam’s powerhouse 1. Site-specific releases were made directly into the ice and trash sluiceway and in the tailrace of Bonneville Dam below the outfall of powerhouse 2 juvenile bypass system.

  14. 76 FR 57731 - Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-16

    ... features: (1) A 48- inch diameter, 250-foot-long steel-reinforced plastic pipe penstock; (2) a 40-foot by 30-foot concrete powerhouse containing a 3-megawatt turbine/generator; (3) an approximately...

  15. 75 FR 40804 - FFP Missouri 2, LLC; Notice of Preliminary Permit Applications Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-14

    ...-foot-wide intake structure; (4) a proposed 900-foot-long, 12-foot diameter steel penstock; (5) a proposed reinforced concrete powerhouse containing a 3.5-megawatt turbine/ generator; (6) a proposed...

  16. 75 FR 71429 - Clean River Power 15, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-23

    ... flows from the powerhouse to the Wailua River; (6) a switchyard containing a three-phase step-up transformer; (7) an approximately 1.92-mile-long, 25-kilovolt transmission line extending from the...

  17. View of stanchions facing SW. The Grandluxe Express luxury train, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of stanchions facing SW. The Grandluxe Express luxury train, formerly the American Orient Express, sits in foreground. Powerhouse in background. - Grand Canyon Village Utilities, Grand Canyon National Park, Grand Canyon Village, Coconino County, AZ

  18. 76 FR 24014 - Renew Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-29

    ... head turbines rated at 500-kilowatts each; (2) a new powerhouse; (3) a crest-mounted walkway carrying hydraulic and electrical conduits; (4) one 600-foot-long and one 300-foot-long transmission line; and...

  19. ERECTING SHOP, EAST SIDE, LOOKING SOUTH. LEFT FOREGROUND BREAK IN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ERECTING SHOP, EAST SIDE, LOOKING SOUTH. LEFT FOREGROUND BREAK IN WALL IS FOR PASSAGE OF STEAM-POWERED BELTING FROM POWERHOUSE. - Southern Pacific, Sacramento Shops, Erecting Shop, 111 I Street, Sacramento, Sacramento County, CA

  20. 76 FR 79670 - Historic Harrisville, Inc.; Notice of Application Tendered for Filing With the Commission and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-22

    ... intake structure with a 24-foot-high, 5-foot-wide trashrack that would be modified to have 1-inch clear...-diameter steel penstock; (5) an existing powerhouse containing a rebuilt turbine and a new generator...

  1. 5. INTERIOR VIEW OF POWER HOUSE, LOOKING SOUTH, SHOWING 1500 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. INTERIOR VIEW OF POWER HOUSE, LOOKING SOUTH, SHOWING 1500 HP TURBINE AND GENERATOR IN FOREGROUND, FRANCIS TURBINE AND GENERATOR AT REAR - Centerville Hydroelectric System, Powerhouse, Butte Creek, Centerville, Butte County, CA

  2. 12. DETAIL VIEW OF GENERATOR BAY, GENERATOR ROOM, SHOWING TURBINEGENERATOR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. DETAIL VIEW OF GENERATOR BAY, GENERATOR ROOM, SHOWING TURBINE-GENERATOR DRIVE SHAFT IN FOREGROUND, ACCESS BULKHEAD TO TURBINE IN BACKGROUND - Nine Mile Hydroelectric Development, Powerhouse, State Highway 291 along Spokane River, Nine Mile Falls, Spokane County, WA

  3. 11. DETAIL VIEW OF GENERATOR NO. 1, GENERATOR ROOM, SHOWING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. DETAIL VIEW OF GENERATOR NO. 1, GENERATOR ROOM, SHOWING GRAVITY LUBRICATING OIL BOX ABOVE GENERATOR - Nine Mile Hydroelectric Development, Powerhouse, State Highway 291 along Spokane River, Nine Mile Falls, Spokane County, WA

  4. 77 FR 42714 - Eagle Creek Hydropower, LLC, Eagle Creek Land Resources, LLC, Eagle Creek Water Resources, LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-20

    ... and draw water through a new 48-inch-diameter underground penstock which would tap into the project's... parking area associated with the new powerhouse. l. Locations of the Application: A copy of...

  5. 138. Jet Lowe, Photographer, July 1978. GENERAL VIEW NORTH FROM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    138. Jet Lowe, Photographer, July 1978. GENERAL VIEW NORTH FROM CORPS OF ENGINEERS POWERHOUSE OVERLOOKING ST. MARY'S RAPIDS. - Michigan Lake Superior Power Company, Portage Street, Sault Ste. Marie, Chippewa County, MI

  6. 26. photographer unknown 29 December 1937 FLOATING MOORING BIT INSTALLED ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    26. photographer unknown 29 December 1937 FLOATING MOORING BIT INSTALLED IN LOCK SIDEWALL. - Bonneville Project, Navigation Lock No. 1, Oregon shore of Columbia River near first Powerhouse, Bonneville, Multnomah County, OR

  7. 77 FR 64331 - City of Burlington, IA; FFP Iowa 5, LLC; Notice of Competing Preliminary Permit Applications...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-19

    ... powerhouse located on the western half of the existing dam and containing four horizontal Kaplan bulb or pit-Kaplan turbine-generator units, each rated at ] 6.25 MW for a total installed capacity of 25 MW; (2)...

  8. 77 FR 25998 - Carbon Zero, LLC; Notice of Application Accepted for Filing With the Commission, Intent To Waive...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-02

    ... existing powerhouse with two new Kaplan turbine generating units, a 215 kilowatt (kW) unit and a 145 kW unit, with a total installed capacity of 360 kW; (7) a refurbished tailrace discharging water from...

  9. 10. INTERIOR VIEW TO WEST, SHOWING EXCITER, RHEOSTATS, DISCONNECT PANEL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. INTERIOR VIEW TO WEST, SHOWING EXCITER, RHEOSTATS, DISCONNECT PANEL WITH BUS ABOVE, AND OPERATOR'S DESK. - Santa Ana River Hydroelectric System, SAR-2 Powerhouse, Redlands, San Bernardino County, CA

  10. View of the current distribution "bus" atop switching cabinets within ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of the current distribution "bus" atop switching cabinets within the former transformer building. Looking northwest - Childs-Irving Hydroelectric Project, Childs System, Childs Powerhouse, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ

  11. 47. INTERIOR UNDER CONSTRUCTION, SHOWING EXCITERS AND BASES FOR GENERATOR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    47. INTERIOR UNDER CONSTRUCTION, SHOWING EXCITERS AND BASES FOR GENERATOR UNITS. EEC print no. N-C-01-00033, no date. Photograph by Benjamin F. Pearson. - Santa Ana River Hydroelectric System, SAR-1 Powerhouse, Redlands, San Bernardino County, CA

  12. 54. ALDER CREEK DIVERSION, PROJECT 1933, EXHIBIT F, SANTA ANA ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    54. ALDER CREEK DIVERSION, PROJECT 1933, EXHIBIT F, SANTA ANA POWERHOUSE NO. 2 SCE drawing no. 5206858, no date (FERC no. 1933-48). - Santa Ana River Hydroelectric System, Redlands, San Bernardino County, CA

  13. 39. INTERIOR, WITH WORKERS SEATED IN FRONT OF CONTROL PANEL. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    39. INTERIOR, WITH WORKERS SEATED IN FRONT OF CONTROL PANEL. EEC print no. G-C-01-00191, no date. Photograph by Benjamin F. Pearson. - Santa Ana River Hydroelectric System, SAR-1 Powerhouse, Redlands, San Bernardino County, CA

  14. 49. DOBLE BUCKETS ON PELTON WHEEL. EEC print no. GC0100148, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    49. DOBLE BUCKETS ON PELTON WHEEL. EEC print no. G-C-01-00148, no date. Photograph by Benjamin F. Pearson. - Santa Ana River Hydroelectric System, SAR-1 Powerhouse, Redlands, San Bernardino County, CA

  15. 53. OPERATOR WORKING GOVERNOR ON UNIT NO. 4. SCE negative ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    53. OPERATOR WORKING GOVERNOR ON UNIT NO. 4. SCE negative no. 2685, no date. Photograph by G. Haven Bishop. - Santa Ana River Hydroelectric System, SAR-1 Powerhouse, Redlands, San Bernardino County, CA

  16. 76 FR 60491 - Mona South Pumped Storage Project; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-29

    ... consist of the following: (1) An underground powerhouse containing the pump-turbines and motor- generators... Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including...

  17. 53. NEW BCB AND LIGHTNING ARRESTER ARRANGEMENT, SANTA ANA RIVER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    53. NEW BCB AND LIGHTNING ARRESTER ARRANGEMENT, SANTA ANA RIVER NO. 2, JAN. 24, 1977. SCE drawing no. 455670-0. - Santa Ana River Hydroelectric System, SAR-2 Powerhouse, Redlands, San Bernardino County, CA

  18. 18 CFR 5.5 - Notification of intent.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... project works licensed, if any, such as dam and reservoir, powerhouse, or transmission lines. (6) The... the existing or proposed project dam; (iii) Every irrigation district, drainage district, or similar...

  19. 8. Photocopy of Station Grounding drawing showing floor plans (from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. Photocopy of Station Grounding drawing showing floor plans (from the BPA Engineering Vault, Drawing 005319, 3 May 1939) - Bonneville Power Administration South Bank Substation, I-84, South of Bonneville Dam Powerhouse, Bonneville, Multnomah County, OR

  20. 32. SHAW BOX 5 TON CRANE, SANTA ANA RIVER NO. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    32. SHAW BOX 5 TON CRANE, SANTA ANA RIVER NO. 3, JAN. 24, 1977. SCE drawing no. 455678-0. - Santa Ana River Hydroelectric System, SAR-3 Powerhouse, San Bernardino National Forest, Redlands, San Bernardino County, CA

  1. 6. INTERIOR OVERVIEW WITH TURBINE WATERWHEEL GOVERNOR. PANORAMIC VIEW 1/2, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. INTERIOR OVERVIEW WITH TURBINE WATERWHEEL GOVERNOR. PANORAMIC VIEW 1/2, LOOKING SOUTHEAST. - Santa Ana River Hydroelectric System, SAR-3 Powerhouse, San Bernardino National Forest, Redlands, San Bernardino County, CA

  2. 4. NORTH ELEVATION, SHOWING ADMINISTRATIVE OFFICES AT LEFT REAR, AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. NORTH ELEVATION, SHOWING ADMINISTRATIVE OFFICES AT LEFT REAR, AND SWITCH RACK AT RIGHT REAR. VIEW TO SOUTH-SOUTHEAST. - Santa Ana River Hydroelectric System, SAR-3 Powerhouse, San Bernardino National Forest, Redlands, San Bernardino County, CA

  3. 2. WEST ELEVATION, SHOWING TAILRACE AND SLIDING DOOR UNDER SHED ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. WEST ELEVATION, SHOWING TAILRACE AND SLIDING DOOR UNDER SHED ROOF. ADMINISTRATIVE OFFICE IS IN BACKGROUND AT RIGHT. VIEW TO EAST-NORTHEAST. - Santa Ana River Hydroelectric System, SAR-3 Powerhouse, San Bernardino National Forest, Redlands, San Bernardino County, CA

  4. 146. Credit ER. Rubble masonry header box with dual intake ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    146. Credit ER. Rubble masonry header box with dual intake pipes at Coleman powerhouse forebay. (ER, v. 64 1911 p. 701). - Battle Creek Hydroelectric System, Battle Creek & Tributaries, Red Bluff, Tehama County, CA

  5. 121. Credit JE. Galpin Creek ditch, a feeder leading water ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    121. Credit JE. Galpin Creek ditch, a feeder leading water to the Keswick ditch, supplying Volta powerhouse. (JE, v. 12 1902 p. 235). - Battle Creek Hydroelectric System, Battle Creek & Tributaries, Red Bluff, Tehama County, CA

  6. 14. Credit JTL. View of north and west elevations of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. Credit JTL. View of north and west elevations of powerhouse and switch house. Note water-cooled transformers. - Battle Creek Hydroelectric System, Battle Creek & Tributaries, Red Bluff, Tehama County, CA

  7. 20. GENERATOR #1 NEEDLE VALVE CONTROL WHEEL, WATERWHEEL GOVERNOR, PENSTOCK ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. GENERATOR #1 NEEDLE VALVE CONTROL WHEEL, WATERWHEEL GOVERNOR, PENSTOCK PRESSURE GAUGE, AND GOVERNOR OIL SET. VIEW TO EAST. - Santa Ana River Hydroelectric System, SAR-2 Powerhouse, Redlands, San Bernardino County, CA

  8. 12. FIRST FLOOR CAR BARN SPACE, SHOWING COLUMNS AND ROOF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. FIRST FLOOR CAR BARN SPACE, SHOWING COLUMNS AND ROOF STRUCTURE. VIEW TO SOUTHEAST. - Commercial & Industrial Buildings, Key City Electric Street Railroad, Powerhouse & Storage Barn, Eighth & Washington Streets, Dubuque, Dubuque County, IA

  9. 11. EXCITER, REACTION TURBINE, AND PENSTOCK/TAILRACE CONNECTOR PIPES. VIEW TO ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. EXCITER, REACTION TURBINE, AND PENSTOCK/TAILRACE CONNECTOR PIPES. VIEW TO NORTHWEST. - Santa Ana River Hydroelectric System, SAR-3 Powerhouse, San Bernardino National Forest, Redlands, San Bernardino County, CA

  10. 19. R.W. Oliver, photographer 1 May 1934 VIEW LOOKING WEST, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. R.W. Oliver, photographer 1 May 1934 VIEW LOOKING WEST, SHOWING COFFERDAMS MARKING AREA FOR CONSTRUCTION OF POWERHOUSE AND NAVIGATION LOCK. - Bonneville Project, Columbia River, 1 mile Northeast of Exit 40, off Interstate 84, Bonneville, Multnomah County, OR

  11. 76 FR 69721 - Goat Lake Hydro, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-09

    ...-ground penstock extending from the outlet of the intake tunnel to the powerhouse on the west bank of the... average hydraulic head of 2,120 feet; (6) an excavated, riprap-lined channel tailrace extending about...

  12. 3. View of east elevation of original section of Langdale ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. View of east elevation of original section of Langdale Cotton Mill, looking southwest from walk to powerhouse across channel. - Langdale Cotton Mill, 5910 Nineteenth Avenue, Valley, Chambers County, AL

  13. 24. BEDROOM #1 INTERIOR SHOWING OPEN DOOR TO HALL WITH ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    24. BEDROOM #1 INTERIOR SHOWING OPEN DOOR TO HALL WITH HALL LINEN CLOSETS VISIBLE IN BACKGROUND, AND PARTIALLY OPEN DOOR TO CLOSET. VIEW TO EAST. - Big Creek Hydroelectric System, Powerhouse 8, Operator Cottage, Big Creek, Big Creek, Fresno County, CA

  14. 51. LOOKING NORTHEAST AT EIMCO WASTE WATER TREATMENT THICKENER No. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    51. LOOKING NORTHEAST AT EIMCO WASTE WATER TREATMENT THICKENER No. 2, ELECTRIC POWERHOUSE No. 2, AND OUTDOOR ELECTRICAL SUBSTATION IN BACKGROUND. (Jet Lowe) - U.S. Steel Duquesne Works, Blast Furnace Plant, Along Monongahela River, Duquesne, Allegheny County, PA

  15. Detail of exciter turbine showing shaft, scroll case, servomotor and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Detail of exciter turbine showing shaft, scroll case, servo-motor and operating ring (left foreground) and hand wheel for butterfly valve (right background) - Morony Hydroelectric Facility, Dam and Powerhouse, Morony Dam Road, Great Falls, Cascade County, MT

  16. 73. photographer unknown 9 January 1936 TOP OF DRAFT TUBE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    73. photographer unknown 9 January 1936 TOP OF DRAFT TUBE LINER AND SPEED RING PIERS. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  17. 78 FR 20911 - Archon Energy 1, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-08

    ... option would consist of the following: (1) A gated water intake canal; (2) a 330-foot-long diversion... powerhouse and turbine structure enclosing one Kaplan turbine and generator; and (5) appurtenant...

  18. 76 FR 30339 - Reliable Storage 1 LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-25

    ...- foot-diameter, and 50-foot-long; (7) a powerhouse/pumping station containing three pump/generating... to a local utility. Applicant Contact: Mr. Daniel R. Irvin, Free Flow Power Corporation, 239 Causeway...

  19. Detail of original stepup transformer showing hightension bushing on top ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Detail of original step-up transformer showing high-tension bushing on top of tank and oil tank to left, view to north-northwest - Morony Hydroelectric Facility, Dam and Powerhouse, Morony Dam Road, Great Falls, Cascade County, MT

  20. 33 CFR Appendix A to Part 221 - Part 16-Procedures Relating to Takeover and Relicensing of Licensed Projects

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... number; (d) type of principal project works licensed, e.g., dam and reservoir, powerhouse, transmission... for the removal or other disposition of power facilities of the project. A “non-power license”...

  1. 48. AUTOMATIC WATER CONTROL MOTOR DRIVE FOR NEEDLES CONSTRUCTION DETAILS, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    48. AUTOMATIC WATER CONTROL MOTOR DRIVE FOR NEEDLES CONSTRUCTION DETAILS, SANTA ANA RIVER NO. 2, JAN. 24, 1977. SCE drawing no. 455667-0. - Santa Ana River Hydroelectric System, SAR-2 Powerhouse, Redlands, San Bernardino County, CA

  2. View of rear of Childs Powerhosue. Rockwork on east end ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of rear of Childs Powerhosue. Rockwork on east end was recently replaced following a flood. Looking south-southwest - Childs-Irving Hydroelectric Project, Childs System, Childs Powerhouse, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ

  3. 35. SAR1 UNDER CONSTRUCTION, SHOWING TAILRACE AREA AND SCAFFOLDING. EEC ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    35. SAR-1 UNDER CONSTRUCTION, SHOWING TAILRACE AREA AND SCAFFOLDING. EEC print no. N-C-01-00028, no date. Photograph by Benjamin F. Pearson. - Santa Ana River Hydroelectric System, SAR-1 Powerhouse, Redlands, San Bernardino County, CA

  4. 52. SAR1, OPERATOR WORKING GOVERNOR. EEC print no. GC0100390, no ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    52. SAR-1, OPERATOR WORKING GOVERNOR. EEC print no. G-C-01-00390, no date. Photograph by Benjamin F. Pearson. - Santa Ana River Hydroelectric System, SAR-1 Powerhouse, Redlands, San Bernardino County, CA

  5. 36. SAR1 UNDER CONSTRUCTION, WITH WORKERS ATOP CRANE. EEC print ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    36. SAR-1 UNDER CONSTRUCTION, WITH WORKERS ATOP CRANE. EEC print no. N-C-01-00031, no date. Photograph by Benjamin F. Pearson. - Santa Ana River Hydroelectric System, SAR-1 Powerhouse, Redlands, San Bernardino County, CA

  6. 33. SAR1, LOOKING DOWN CANYON OVER TAILRACE CONSTRUCTION. EEC print ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    33. SAR-1, LOOKING DOWN CANYON OVER TAILRACE CONSTRUCTION. EEC print no. G-C-01-00269, no date. Photograph by Benjamin F. Pearson. - Santa Ana River Hydroelectric System, SAR-1 Powerhouse, Redlands, San Bernardino County, CA

  7. 59. Credit FM. Flood waters on South Battle Creek next ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    59. Credit FM. Flood waters on South Battle Creek next to powerhouse. Note height of water in relation to tailraces. - Battle Creek Hydroelectric System, Battle Creek & Tributaries, Red Bluff, Tehama County, CA

  8. 75 FR 65311 - Renew Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-22

    ... transmission line from the powerhouse to the Township of Boonton's Waste Treatment Plant's control room; and... strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original...

  9. 16. DINING ROOM INTERIOR SHOWING DOUBLE DOOR ARCHWAY INTO LIVING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. DINING ROOM INTERIOR SHOWING DOUBLE DOOR ARCHWAY INTO LIVING ROOM AND DOUBLE FRENCH DOORS INTO SOUTH END SCREENED PORCH. VIEW TO SOUTHWEST. - Big Creek Hydroelectric System, Powerhouse 8, Operator Cottage, Big Creek, Big Creek, Fresno County, CA

  10. 14. LIVING ROOM INTERIOR SHOWING WEST SIDE AND SOUTH END ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. LIVING ROOM INTERIOR SHOWING WEST SIDE AND SOUTH END DOUBLE FRENCH DOORS, AND FIBERBOARD WALLS. VIEW TO SOUTHWEST. - Big Creek Hydroelectric System, Powerhouse 8, Operator Cottage, Big Creek, Big Creek, Fresno County, CA

  11. 31. HALL INTERIOR SHOWING SINGLE FRENCH DOOR TO NORTH SIDE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    31. HALL INTERIOR SHOWING SINGLE FRENCH DOOR TO NORTH SIDE SCREENED PORCH, AND TRAP-DOOR ACCESS TO ATTIC. VIEW TO NORTHEAST. - Big Creek Hydroelectric System, Powerhouse 8, Operator Cottage, Big Creek, Big Creek, Fresno County, CA

  12. 29. BEDROOM #3 INTERIOR SHOWING DOUBLE FRENCH DOORS TO SCREENED ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    29. BEDROOM #3 INTERIOR SHOWING DOUBLE FRENCH DOORS TO SCREENED PORCH AND FIVE-PANELED DOOR TO HALL. VIEW TO WEST. - Big Creek Hydroelectric System, Powerhouse 8, Operator Cottage, Big Creek, Big Creek, Fresno County, CA

  13. 27. BEDROOM #2 INTERIOR SHOWING DOUBLE FRENCH DOORS TO SCREENED ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    27. BEDROOM #2 INTERIOR SHOWING DOUBLE FRENCH DOORS TO SCREENED PORCH AND UNUSUAL WINDOWED CLOSET THROUGH OPEN FIVE-PANELED DOOR. VIEW TO WEST. - Big Creek Hydroelectric System, Powerhouse 8, Operator Cottage, Big Creek, Big Creek, Fresno County, CA

  14. 12. INTERIOR OF NORTH END ENCLOSED SCREEN PORCH. DOUBLE FRENCH ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. INTERIOR OF NORTH END ENCLOSED SCREEN PORCH. DOUBLE FRENCH DOORS LEAD TO BEDROOM #3. VIEW TO EAST. - Big Creek Hydroelectric System, Powerhouse 8, Operator Cottage, Big Creek, Big Creek, Fresno County, CA

  15. 15. VIEW OF THE ORIGINAL 10TON OVERHEAD NILES TRAVELING CRANE. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. VIEW OF THE ORIGINAL 10-TON OVERHEAD NILES TRAVELING CRANE. - Washington Water Power Company Post Falls Power Plant, Middle Channel Powerhouse & Dam, West of intersection of Spokane & Fourth Streets, Post Falls, Kootenai County, ID

  16. 77 FR 62511 - Soule Hydro LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-15

    ..., float, and access road; (7) a 138-kilovolt buried transmission line extending 700 feet from the powerhouse across the Soule River, 10 miles submarine cable across the Portland Canal, then 2.5 miles...

  17. 77 FR 20622 - PPL Holtwood, LLC; Notice of Applications for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-05

    ... acres of land owned by the licensee to be used for the new powerhouse and other project purposes... available for inspection and reproduction at the Commission's Public Reference Room, located at 888...

  18. 60. NEEDLE AND NOZZLE TIP, SANTA ANA NO. 1, SOUTHERN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    60. NEEDLE AND NOZZLE TIP, SANTA ANA NO. 1, SOUTHERN CALIFORNIA EDISON CO., APR. 28, 1910, REVISED MAY 12, 1910. SCE drawing no. 4500. - Santa Ana River Hydroelectric System, SAR-1 Powerhouse, Redlands, San Bernardino County, CA

  19. 3. OBLIQUE VIEW OF THE PRESENT CONTROL ROOM (ORIGINALLY THE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. OBLIQUE VIEW OF THE PRESENT CONTROL ROOM (ORIGINALLY THE TRANSFORMER ROOM). - Washington Water Power Company Post Falls Power Plant, Middle Channel Powerhouse & Dam, West of intersection of Spokane & Fourth Streets, Post Falls, Kootenai County, ID

  20. 24. TELEPHONE BOOTH (LEFT), TRANSFORMERS (RIGHT), AND OIL CIRCUIT BREAKERS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    24. TELEPHONE BOOTH (LEFT), TRANSFORMERS (RIGHT), AND OIL CIRCUIT BREAKERS (TOP). SCE negative no. 10341, November 1, 1923. Photograph by G. Haven Bishop. - Santa Ana River Hydroelectric System, SAR-3 Powerhouse, San Bernardino National Forest, Redlands, San Bernardino County, CA

  1. 13. POWER CIRCUIT BREAKER, RECESSED IN CABINET BEHIND HINGED METAL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. POWER CIRCUIT BREAKER, RECESSED IN CABINET BEHIND HINGED METAL DOOR (SHOWN OPEN), WEST SIDE, MAIN FLOOR - Bonneville Power Administration South Bank Substation, I-84, South of Bonneville Dam Powerhouse, Bonneville, Multnomah County, OR

  2. 2. EXTERIOR SOUTH END OF BUILDING 104 SHOWING CONCRETE STEPS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. EXTERIOR SOUTH END OF BUILDING 104 SHOWING CONCRETE STEPS WITH METAL HANDRAIL TO HOUSE FROM POWERHOUSE AND OFFSET GABLE OVER FRONT ENTRY. VIEW TO NORTHWEST. - Rush Creek Hydroelectric System, Worker Cottage, Rush Creek, June Lake, Mono County, CA

  3. 5. DETAIL OF PENSTOCK OPENINGS AND HEADGATE DECK FROM UPSTREAM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. DETAIL OF PENSTOCK OPENINGS AND HEADGATE DECK FROM UPSTREAM (WEST) SIDE, WITH SOUTH EMBANKMENT (MI-98-E) COREWALL AT RIGHT. VIEW TO NORTH. - Cooke Hydroelectric Plant, Powerhouse, Cook Dam Road at Au Sable River, Oscoda, Iosco County, MI

  4. 4. SOUTH SIDE, WITH SUBSTATION (MI98D) AT RIGHT AND SOUTH ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. SOUTH SIDE, WITH SUBSTATION (MI-98-D) AT RIGHT AND SOUTH EMBANKMENT (MI-98-E) AT LEFT FOREGROUND. VIEW TO NORTHWEST. - Cooke Hydroelectric Plant, Powerhouse, Cook Dam Road at Au Sable River, Oscoda, Iosco County, MI

  5. 7. INTERIOR VIEW SHOWING GENERATING UNITS AT RIGHT, OFFICE AT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. INTERIOR VIEW SHOWING GENERATING UNITS AT RIGHT, OFFICE AT LEFT, AND SWITCHING STATION AT LEFT FOREGROUND. VIEW TO SOUTHEAST. - Cooke Hydroelectric Plant, Powerhouse, Cook Dam Road at Au Sable River, Oscoda, Iosco County, MI

  6. 1. EAST FRONT AND NORTH SIDES, WITH SUBSTATION (MI98D) AT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. EAST FRONT AND NORTH SIDES, WITH SUBSTATION (MI-98-D) AT LEFT AND SPILLWAY SEPARATING WALL (MI-98-B) IN FOREGROUND. VIEW TO SOUTH. - Cooke Hydroelectric Plant, Powerhouse, Cook Dam Road at Au Sable River, Oscoda, Iosco County, MI

  7. 14. DETAIL OF GENERATING UNIT NO. 3 SHOWING HORIZONTAL TURBINECONNECTED ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. DETAIL OF GENERATING UNIT NO. 3 SHOWING HORIZONTAL TURBINE-CONNECTED SHAFT EMERGING FROM WEST WALL AT UPPER RIGHT. VIEW TO SOUTH. - Cooke Hydroelectric Plant, Powerhouse, Cook Dam Road at Au Sable River, Oscoda, Iosco County, MI

  8. 2. VIEW OF GOVERNANCE EQUIPMENT AT UNIT 3 GENERATOR (RIGHT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. VIEW OF GOVERNANCE EQUIPMENT AT UNIT 3 GENERATOR (RIGHT BACKGROUND) SHOWING PRESSURE TANK (LEFT BACKGROUND), GOVERNOR STAND (CENTER), AND SUMP PUMP (RIGHT FOREGROUND). VIEW TO SOUTHEAST. - Black Eagle Hydroelectric Facility, Powerhouse, Great Falls, Cascade County, MT

  9. 28. Photocopied 1973 from The Rig & Reel Magazine, (March, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    28. Photocopied 1973 from The Rig & Reel Magazine, (March, 1923) p. 2. INTERIOR OF CENTRAL POWERHOUSE AT VOLCANO - NOW DISMANTLED. - West Oil Company Endless Wire Pumping Station, U.S. Route 50 (Volcano vicinity), Petroleum, Ritchie County, WV

  10. 7. SOUTHEAST PENSTOCK ENTERING RECEIVER ON NORTHEAST SIDE OF SAR1, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. SOUTHEAST PENSTOCK ENTERING RECEIVER ON NORTHEAST SIDE OF SAR-1, ALSO SHOWING TURBINE SHUT OFF VALVES AND ISOLATION VALVE. VIEW TO WEST. - Santa Ana River Hydroelectric System, SAR-1 Powerhouse, Redlands, San Bernardino County, CA

  11. 1. SAR1, SOUTHEAST AND SOUTHWEST ELEVATIONS, WITH SWITCH RACK AT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. SAR-1, SOUTHEAST AND SOUTHWEST ELEVATIONS, WITH SWITCH RACK AT LEFT, AND SANTA ANA WELL #1 AND STONE RETAINING WALLS AT RIGHT. VIEW TO NORTH. - Santa Ana River Hydroelectric System, SAR-1 Powerhouse, Redlands, San Bernardino County, CA

  12. 29. SAR2, VIEW TO NORTH WITH EXCITERS AT LEFT. SCE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    29. SAR-2, VIEW TO NORTH WITH EXCITERS AT LEFT. SCE negative no. 1043, photographed June 6, 1912. Photograph by G. Haven Bishop. - Santa Ana River Hydroelectric System, SAR-2 Powerhouse, Redlands, San Bernardino County, CA

  13. 31. SAR2, INTERIOR SHOWING SWITCHBOARD, OPERATOR'S DESK, AND TRANSFORMER BANK. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    31. SAR-2, INTERIOR SHOWING SWITCHBOARD, OPERATOR'S DESK, AND TRANSFORMER BANK. SCE negative no. 10327, November 1, 1923. Photograph by G. Haven Bishop. - Santa Ana River Hydroelectric System, SAR-2 Powerhouse, Redlands, San Bernardino County, CA

  14. 32. SAR1, VIEW FROM STABLE LOFT. SCE negative no. 10319, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    32. SAR-1, VIEW FROM STABLE LOFT. SCE negative no. 10319, November 1, 1923. Photograph by G. Haven Bishop. - Santa Ana River Hydroelectric System, SAR-1 Powerhouse, Redlands, San Bernardino County, CA

  15. 34. SAR2, WATERDRIVEN EXCITERS. SCE negative no. 10329, November 1, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    34. SAR-2, WATER-DRIVEN EXCITERS. SCE negative no. 10329, November 1, 1923. Photograph by G. Haven Bishop. - Santa Ana River Hydroelectric System, SAR-2 Powerhouse, Redlands, San Bernardino County, CA

  16. 26. SAR2, GENERAL VIEW FROM WEST SHOWING DAMAGE FROM 1938 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    26. SAR-2, GENERAL VIEW FROM WEST SHOWING DAMAGE FROM 1938 FLOOD. SCE negative no. 20949, March 30, 1938. Photograph by G. Haven Bishop. - Santa Ana River Hydroelectric System, SAR-2 Powerhouse, Redlands, San Bernardino County, CA

  17. 4. From west side of boat slip; ore piles, unloaders, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. From west side of boat slip; ore piles, unloaders, blast furnaces, tube conveyors, ore conveyors, stock house, powerhouse. Looking north/northeast - Rouge Steel Company, 3001 Miller Road, Dearborn, MI

  18. 1. GENERAL VIEW OF RAILROAD YARD LOOKING NORTH. Office and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. GENERAL VIEW OF RAILROAD YARD LOOKING NORTH. Office and Car and Wheel Shops to left, Engine House No. 1 to right. Ebensburg Processing Plant and Powerhouse (Colver Mine) in far left background. - Cambria & Indiana Railroad, Colver, Cambria County, PA

  19. Diabetes Superfoods

    MedlinePlus

    ... get rid of as much sodium as possible. Dark Green Leafy Vegetables Spinach, collards, kale – these powerhouse ... a favorite. The good news is that no matter how you like your tomatoes, pureed, raw, or ...

  20. 6. GENERAL VIEW OF TRASH RACKS AND HEADWORKS; METALSIDED BUILDING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. GENERAL VIEW OF TRASH RACKS AND HEADWORKS; METAL-SIDED BUILDING WITH GABLE ROOF IS THE ELEVATOR SHAFT TO THE CAVITY POWERHOUSE - Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

  1. 5. GENERAL VIEW OF HEADWORKS AND TRANSFORMER HOUSE; THE STRUCTURE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. GENERAL VIEW OF HEADWORKS AND TRANSFORMER HOUSE; THE STRUCTURE IN THE FOREGROUND IS THE HEADWORKS FOR THE SNOQUALMIE POWERHOUSE NO. 2 - Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

  2. 19. Photocopy of photograph (from Station 'L' office files, Portland, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. Photocopy of photograph (from Station 'L' office files, Portland, Oregon) Photographer unknown, 1930 LAYING THE BASEMENT FLOOR FOR THE POWERHOUSE EXTENSION, 1930 - Portland General Electric Company, Station "L", 1841 Southeast Water Street, Portland, Multnomah County, OR

  3. 18. Photocopy of photograph (from Station 'L' office files, Portland, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. Photocopy of photograph (from Station 'L' office files, Portland, Oregon) Photographer unknown, 1930 CONSTRUCTION OF THE POWERHOUSE EXTENSION, 1930 - Portland General Electric Company, Station "L", 1841 Southeast Water Street, Portland, Multnomah County, OR

  4. View of downstream face of Grand Coulee Dam (from just ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of downstream face of Grand Coulee Dam (from just below No. 3 Powerhouse), looking southwest. - Columbia Basin Project, Grand Coulee Dam & Franklin D. Roosevelt Lake, Across Columbia River, Southeast of Town of Grand Coulee, Grand Coulee, Grant County, WA

  5. 6. Main Control Switchboard (north end interior), view to the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. Main Control Switchboard (north end interior), view to the southwest. - Washington Water Power Clark Fork River Noxon Rapids Hydroelectric Development, Powerhouse, South bank of Clark Fork River at Noxon Rapids, Noxon, Sanders County, MT

  6. 14. Generator Fire Protection for Unit 5 (low pressure), view ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. Generator Fire Protection for Unit 5 (low pressure), view to the southeast. - Washington Water Power Clark Fork River Noxon Rapids Hydroelectric Development, Powerhouse, South bank of Clark Fork River at Noxon Rapids, Noxon, Sanders County, MT

  7. 19. Oil Storage Tanks, view to the northwest. Washington ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. Oil Storage Tanks, view to the northwest. - Washington Water Power Clark Fork River Cabinet Gorge Hydroelectric Development, Powerhouse, North Bank of Clark Fork River at Cabinet Gorge, Cabinet, Bonner County, ID

  8. 4. DETAIL VIEW OF LIFTING GEAR ON MULE AND RACK ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. DETAIL VIEW OF LIFTING GEAR ON MULE AND RACK ATTACHMENT BOOKS, LOOKING EAST - Nine Mile Hydroelectric Development, Powerhouse, State Highway 291 along Spokane River, Nine Mile Falls, Spokane County, WA

  9. Historic view of penstock repair following 1910's landslide just east ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Historic view of penstock repair following 1910's landslide just east of powerhouse; looking east. (photographer unknown, ca. 1910's) - Nooksack Falls Hydroelectric Plant, Route 542, Glacier, Whatcom County, WA

  10. 31. REAR OF CAR BARN DURING RECONSTRUCTION: Photocopy of July ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    31. REAR OF CAR BARN DURING RECONSTRUCTION: Photocopy of July 1908 photograph showing west rear of powerhouse and car barn. View from the north. - San Francisco Cable Railway, Washington & Mason Streets, San Francisco, San Francisco County, CA

  11. 77 FR 66607 - Placer County Water Agency; Notice of Application for Approval of Contract for the Sale of Power...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-06

    ... smaller reservoirs and diversion pools, and five powerhouses, and is located in the Sierra Nevada range in... the new power purchase agreement, or motions to intervene may be filed with the Commission no later...

  12. 8. Beginning of the Penstock pipe east of the Forebay. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. Beginning of the Penstock pipe east of the Forebay. View is looking approximately east. Poles once carried power lines west from the powerhouse. - Rock Creek Hydroelectric Project, Rock Creek, Baker County, OR

  13. View of Diversion Dam and Flume Intake of the Childs ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of Diversion Dam and Flume Intake of the Childs System at the Irving Powerhouse. Looking northwest - Childs-Irving Hydroelectric Project, Childs System, Flume Intake & Forebay, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ

  14. 78 FR 37210 - Parker Knoll Hydro, LLC; Notice of Environmental Site Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-20

    ... Hydroelectric Project. ] f. Location: At Parker Mountain, near the Town of Richfield, Piute County, Utah. The...-feet-diameter tailrace tunnel; (9) a powerhouse containing four variable speed, reversible pump-turbine...

  15. 2. GENERAL EXTERIOR VIEW LOOKING WEST, SHOWING CHANNEL DOWNSTREAM FROM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. GENERAL EXTERIOR VIEW LOOKING WEST, SHOWING CHANNEL DOWNSTREAM FROM NAVIGATION LOCK #1; MOVABLE BRIDGE IS VISIBLE IN LEFT FOREGROUND. - Bonneville Project, Navigation Lock No. 1, Oregon shore of Columbia River near first Powerhouse, Bonneville, Multnomah County, OR

  16. 9. DETAIL EXTERIOR VIEW LOOKING SOUTHEAST, SHOWING DOWNSTREAM MITER GATES ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. DETAIL EXTERIOR VIEW LOOKING SOUTHEAST, SHOWING DOWNSTREAM MITER GATES FOR NAVIGATION LOCK #1. - Bonneville Project, Navigation Lock No. 1, Oregon shore of Columbia River near first Powerhouse, Bonneville, Multnomah County, OR

  17. 34. ELEVATION OF RELAY AND CONTROL SWITCHBOARD, SANTA ANA RIVER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    34. ELEVATION OF RELAY AND CONTROL SWITCHBOARD, SANTA ANA RIVER P.H. #3, JUNE 23, 1943. SCE drawing no. 413187-1. - Santa Ana River Hydroelectric System, SAR-3 Powerhouse, San Bernardino National Forest, Redlands, San Bernardino County, CA

  18. 12. GENERATING UNIT NO. 2, WITH (LR) CONTINUOUS CURRENT EXCITER, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. GENERATING UNIT NO. 2, WITH (L-R) CONTINUOUS CURRENT EXCITER, ALTERNATING CURRENT GENERATOR, AND TURBINE GOVERNOR. VIEW TO SOUTH. - Cooke Hydroelectric Plant, Powerhouse, Cook Dam Road at Au Sable River, Oscoda, Iosco County, MI

  19. 49. INTERIOR OF GILLEY ROOM: Interior view towards southeast of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    49. INTERIOR OF GILLEY ROOM: Interior view towards southeast of the Gilley Room on the second floor of the powerhouse and ear barn. - San Francisco Cable Railway, Washington & Mason Streets, San Francisco, San Francisco County, CA

  20. 7. NORTH EXTERIOR SIDE SHOWING TRIANGULAR KNEE BRACE SUPPORTS AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. NORTH EXTERIOR SIDE SHOWING TRIANGULAR KNEE BRACE SUPPORTS AND ENCLOSED PORCH SCREENED WINDOWS. VIEW TO SOUTH. - Big Creek Hydroelectric System, Powerhouse 8, Operator Cottage, Big Creek, Big Creek, Fresno County, CA

  1. 77 FR 21765 - Nevada Hydro Company, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-11

    ... surface elevation of 2,830 feet above mean sea level (msl); (2) a powerhouse with two reversible pump-turbine units with a total installed capacity of 600 megawatts; (3) the existing Lake Elsinore to be...

  2. Seismic Stability Evaluation of Alben Barkley Lock and Dam Project. Volume 3. Field and Laboratory Investigations

    DTIC Science & Technology

    1989-03-01

    section, which is founded entirely on lime- stone bedrock, includes the spillway , the powerhouse, and the lock. The over- flow section is 804 ft long and...The reservoir is contained by an concrete gravity section flanked by earth embankment dams. The concrete sectioni includes a gated spillway , a lock...upstream and down- stream of he powerhouse, parallel to the direction of flow , to protect the embankment dam and its alluvial foundation as these materials

  3. 19. Photocopy of photograph (original copy in Edison collection). Photographer ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. Photocopy of photograph (original copy in Edison collection). Photographer and date unknown, although probably taken before 1920. SOUTH SIDE OF TULE RIVER POWERHOUSE COMPLEX SHOWING OPERATOR COTTAGE AT PHOTO RIGHT AND POWERHOUSE AND TRANSFORMER BUILDING IN BACKGROUND AT PHOTO LEFT. LINE OF BURIED PENSTOCK IS VISIBLE ON SIDE OF HILL AT PHOTO CENTER. VIEW TO NORTH. - Tule River Hydroelectric Project, Water Conveyance System, Middle Fork Tule River, Springville, Tulare County, CA

  4. 103. Photocopy of original construction drawing, dated 12 December 1933 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    103. Photocopy of original construction drawing, dated 12 December 1933 (Original print in the possession of U.S. Army Corps of Engineers, Portland District, Portland District, Portland, OR.) (T-1-2) UNITED STATES BUREAU OF FISHERIES PROPOSED MULTIPLE COLLECTING FISHWAYS AND HYDRAULIC FISH LIFT AT THE BONNEVILLE POWERHOUSE. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  5. 22. DETAIL TO NORTHWEST OF LUBRICATING OIL TANKS AND FILTERS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    22. DETAIL TO NORTHWEST OF LUBRICATING OIL TANKS AND FILTERS FOR UNITS 1-4 (CENTER), AND UNIT 3 GOVERNOR (RIGHT CENTER FOREGROUND) AND GATE VALVE (RIGHT CENTER BACKGROUND) CONTROLS, OLD POWERHOUSE GENERATOR FLOOR - Trenton Falls Hydroelectric Station, Powerhouse & Substation, On west bank of West Canada Creek, along Trenton Falls Road, 1.25 miles north of New York Route 28, Trenton Falls, Oneida County, NY

  6. 15. The 183Filter Plant with settling basins in January 1945. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. The 183-Filter Plant with settling basins in January 1945. The 182-B Reservoir and Pump House is on the left in the background, and the coal storage pond for the 184-B Power House is in the upper right. View is to the northwest. P-8012 - B Reactor, Richland, Benton County, WA

  7. 500 Contractors Receiving the Largest Dollar Volume of Prime Contract Awards for RDT&E (Research, Development, Test and Evaluation), Fiscal Year 1981.

    DTIC Science & Technology

    1981-01-01

    ARINC RESEARCH CORP 254 N CASE WESTERN RESERVE UNIVERSITY 203 N ARIZONA UNIVERSITY OF 425 B CHALCO ENGINEERING CORP 421 B ARMAMENT SYSTEMS INC 184 B...VIENNA VIRGINIA 785 424 ANALYTICAL ASSESSMENTS CORP S 977 - 447 HYDROACOUSTICS INC S 918 - MARINA DEL REY CALIFORNIA 977 ROCHESTER NEW YORK 918 425 CHALCO

  8. 40 CFR 421.56 - Pretreatment standards for new sources.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... pounds) of copper cast Arsenic .692 .309 Copper .638 .304 Nickel .274 .184 (b) Subpart E—Anode and.../kg (pounds per million pounds) of cathode copper production Arsenic .000 .000 Copper .000 .000 Nickel... Maximum for monthly average mg/kg (pounds per million pounds) of cathode copper production Arsenic .068...

  9. 40 CFR 421.56 - Pretreatment standards for new sources.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... pounds) of copper cast Arsenic .692 .309 Copper .638 .304 Nickel .274 .184 (b) Subpart E—Anode and.../kg (pounds per million pounds) of cathode copper production Arsenic .000 .000 Copper .000 .000 Nickel... Maximum for monthly average mg/kg (pounds per million pounds) of cathode copper production Arsenic .068...

  10. 40 CFR 421.56 - Pretreatment standards for new sources.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... pounds) of copper cast Arsenic .692 .309 Copper .638 .304 Nickel .274 .184 (b) Subpart E—Anode and.../kg (pounds per million pounds) of cathode copper production Arsenic .000 .000 Copper .000 .000 Nickel... Maximum for monthly average mg/kg (pounds per million pounds) of cathode copper production Arsenic .068...

  11. A Funny Thing Happened on the Way to Translation

    ERIC Educational Resources Information Center

    Howard, Jennifer

    2006-01-01

    Amy Richlin, a professor of classics at the University of California at Los Angeles, has just translated "Poenulus," a comedy likely written between 224 B.C. and 184 B.C. by the Roman playwright Plautus. To make the comedy comprehensible for modern audiences, Richlin came up with with a bolder and deliberately controversial approach: Seek out…

  12. A Funny Thing Happened on the Way to Translation

    ERIC Educational Resources Information Center

    Howard, Jennifer

    2006-01-01

    Amy Richlin, a professor of classics at the University of California at Los Angeles, has just translated "Poenulus," a comedy likely written between 224 B.C. and 184 B.C. by the Roman playwright Plautus. To make the comedy comprehensible for modern audiences, Richlin came up with with a bolder and deliberately controversial approach: Seek out…

  13. The Distribution and Flux of Fish in the Forebay of The Dalles Dam in 2003

    SciTech Connect

    Faber, Derrek M.; Hanks, Michael E.; Zimmerman, Shon A.; Skalski, John R.; Dillingham, Peter W.

    2005-04-29

    In spring and summer 2003, the Pacific Northwest National Laboratory led a team that conducted mobile and fixed hydroacoustic surveys in the forebay of The Dalles Dam for the U.S. Army Corps of Engineers - Portland District, for the Anadromous Fish Evaluation Program. The surveys provided information on the distribution and movement of smolt-sized fish relative to ambient factors such as flow, bathymetry, or diel cycle in the forebay at The Dalles Dam. This information is intended to provide baseline data for the development of a surface bypass alternative for juvenile salmon at The Dalles Dam. We sampled the forebay of The Dallas Dam one day and night each week for six weeks in the spring and another six weeks in the summer. In general, during the day in the spring, the greatest densities of smolt-sized fish were observed in the thalweg of the main channel from the Washington bank, to the east side of the powerhouse, along the powerhouse, and concentrated in the areas next to the sluiceway. Fish density was lower on the Washington side of the river and west of mid-powerhouse (north spillway side). The spring night distribution was similar, with a few notable differences. The density of fish was high on the east side of the powerhouse and along the face of the powerhouse, and more fish were detected on the north spillway side. The distribution of sub-yearling sized fish in summer followed the same general patterns as spring, except that summer fish had a greater presence on the east side of the powerhouse and on the north spillway side. The vertical distribution of fish was also determined. In spring 80% of fish were above 5.6 m of depth during the day and above 4.7 m in the night. The summer fish were similarly distributed in the day and night with 80% of the fish in the upper 4.5 m and 4.7 m of the water column respectively. In general the smolt-sized fish were distributed deeper in the water column in the center of the channel than near the edges. The net

  14. Survival estimates of migrant juvenile Salmonids through Bonneville Dam using radio telemetry, 2004

    USGS Publications Warehouse

    Counihan, Timothy D.; Hardiman, Jill; Walker, Chris; Puls, Amy; Holmberg , Glen

    2006-01-01

    During 2004, the USGS evaluated the survival of radio-tagged yearling and subyearling Chinook salmon and steelhead trout through the ice and trash sluiceway and the minimum gap runner (MGR) turbine unit at Bonneville Dam’s powerhouse 1. Survival was estimated using paired release-recapture models with paired releases made directly into these passage routes and in the tailrace of Bonneville Dam. For the evaluations of survival through the MGR two separate control release locations were used; one location was directly downstream of the front roll below the turbine unit and the other release location was further downstream of the powerhouse 2 juvenile bypass outfall. During spring and summer releases of radio-tagged fish into the MGR and the ice and trash sluiceway, powerhouse 1 was not continuously operated due to a policy that prioritized the passage of water through powerhouse 2. Because of this policy, powerhouse 1 was only operated sporadically for short time intervals before and after the releases of radiotagged fish associated with this study.

  15. Small-Scale Hydroelectric Power Demonstration Project: reactivation of the Elk Rapids Hydroelectric Facility. Final technical and construction cost report

    SciTech Connect

    Not Available

    1985-05-01

    The Elk Rapids powerhouse dam is located on the Elk River channel in the Village of Elk Rapids, Michigan. Together with a small spillway structure located approximately 500 ft south of the dam, it constitutes the outlet to Lake Michigan for Elk Lake, Skegemog Lake, Torch Lake, Lake Bellaire, Clam Lake, and several smaller lakes. Power has been generated at the Elk Rapids site since the late nineteenth century, but the history of the present facility goes back to 1916 with the construction of the existing powerhouse dam by the Elk Rapids Iron Works Company. The facility was designed to contain four vertical-shaft generating units; however, only a single 270 hp Leffel type K unit was installed in 1916. In 1929, two additional Leffel units, rated 525 hp, were installed, and in 1930 a third 525 hp Leffel unit was added completely utilizing the capacity of the powerhouse and bringing the combined turbine capacity to 1845 hp.

  16. 39. REBUILT ENGINES AND WINDING MACHINERY: Photocopy of December 1906 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    39. REBUILT ENGINES AND WINDING MACHINERY: Photocopy of December 1906 photograph of the steam engines and winding machinery at the Washington and Mason Street powerhouse. View towards west. United Railroads of San Francisco rebuilt the damaged engines and winders shown in CA-12-60 and CA-12-61. There are no cables strung over the winders in this photograph, indicating that the firm had yet to resume service. Note the rough shed erected over the engines to protect them from weather while work continued on the reconstruction of the powerhouse. - San Francisco Cable Railway, Washington & Mason Streets, San Francisco, San Francisco County, CA

  17. Financial Regulatory Reform: Analysis of the Consumer Financial Protection Agency (CFPA) as Proposed by the Obama Administration and H.R. 3126

    DTIC Science & Technology

    2009-07-17

    122. 16 12 U.S.C. §§ 3801 et seq. 17 12 U.S.C. §§ 2901 et seq. This act is not included as an “Enumerated Consumer Law ” in H.R. 3126. See the “H.R...s definition of “Enumerated Consumer Law ;” however, the bill does transfer enforcement authority over this act to the CFPA. H.R. 3126 § 184(b)(2...definition of “Enumerated Consumer Law ;” however, the bill does transfer enforcement authority over this act to the CFPA. H.R. 3126 § 184(b)(2). 22 15 U.S.C

  18. Prevention of Human Mammary Carcinogenesis

    DTIC Science & Technology

    1995-06-30

    selected naturally-occurring agents (-)-epigallocatechin gallate ( EGCG ), indole-3-carbinol (13C) and genistein (GEN) for growth inhibition of 184-B5...mechanisms of BP-induced and GEN-induced alterations in cell cycle are being investigated in the ongoing studies. In addition, effects of 13C and EGCG are...rodent mammary tumorigenesis. The maximally nontoxic doses of EGCG , 13C and GEN identified by initial dose-response experiments, were used. The data

  19. Relationship Between Scavenger Receptors and uPA:PAI-1 and uPA Receptors in Breast Cancer

    DTIC Science & Technology

    1998-10-01

    Cell Surface Expression of LRP Methods: Confluent cell layers of tumor-derived mammary epithelial cells and a human fibrosarcoma cell line ...could be co-immunoprecipitated together. The human fibrosarcoma cells , HT1080 , were used in this procedure to optimize our co- immunoprecipitation... fibrosarcoma cell line , HT1080 . 100" M MDA-MB-231 E0 184-B5 90 0 NRK 80 70 60t M 50- " 40- LO~ 30- 20- 10-

  20. 124. Photocopy of original construction drawing, dated 12 October 1935 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    124. Photocopy of original construction drawing, dated 12 October 1935 (Original print in the possession of U.S. Army Corps of Engineers, Portland District, Portland, OR.) (T-3-83, Sheet 1 of 6) COLLECTION CHANNEL DETAILS: WOOD GRATING AND BAFFLES IN DIFFUSION CHAMBERS. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  1. 77 FR 19279 - Long Canyon Pumped Storage Project; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-30

    ... would consist of the following: (1) An upper reservoir formed by a 160-foot-high by 6,750-foot-long...-diameter penstocks; (4) an underground powerhouse roughly 750-feet-long by 175-feet-high by 70-feet-wide...) pump-turbines with a capacity of roughly 800 megawatts (MW) (3 units x 267 MW unit). The annual...

  2. 50. PARTIAL FLOOR PLAN SHOWING INDOOR 750 VOLT SWITCHRACK AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    50. PARTIAL FLOOR PLAN SHOWING INDOOR 750 VOLT SWITCHRACK AND MISC. EQUIPMENT, SANTA ANA RIVER NO. 2, DEC. 11, 1951; REVISIONS, DEC. 14, 1951. SCE drawing no. 534985-1. - Santa Ana River Hydroelectric System, SAR-2 Powerhouse, Redlands, San Bernardino County, CA

  3. 76 FR 60490 - Mona North Pumped Storage Project; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-29

    ... line connecting the underground powerhouse to the existing Mona substation. The applicant is studying... located about 2,300 feet south of the existing Mona substation; (3) a 100-foot-high and 13,000-foot-long... of the existing Mona substation; and (3) a 60-foot-high and 13,000-foot-long, earthfill ring dike...

  4. View of 500,000 volt spreading yard that transfers power from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of 500,000 volt spreading yard that transfers power from underground cable, from Third Powerhouse, to overhead line; the towers are pipe-type transformer towers. Looking west. - Columbia Basin Project, Grand Coulee Dam Powerplant Complex, Grand Coulee, Grant County, WA

  5. VIEW OF HISTORIC SLATE SWITCHBOARD IN THE CONTROL ROOM OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW OF HISTORIC SLATE SWITCHBOARD IN THE CONTROL ROOM OF THE ELWHA POWERHOUSE, INCLUDING: METERS, PROTECTIVE RELAYS, AND SWITCHES. NOTE ADDITION OF PERSONAL COMPUTERS FOR POWER METERING AND OPERATIONS. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Elwha Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA

  6. 12. CONTROL PANELS, WEST SIDE (LEFT & RIGHT), MAIN FLOOR: ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. CONTROL PANELS, WEST SIDE (LEFT & RIGHT), MAIN FLOOR: CENTER OF CLUSTERS, TOP BOX: MEGAWATT METER CENTER OF CLUSTERS, LOWER THREE BOXES: AMPERE METERS LEFT SIDE OF CLUSTERS: VOLTAGE CHART RECORDER RIGHT SIDE OF CLUSTERS: RECLOSE RELAY CENTER UNDER CLUSTERS: TESTING SWITCHES BELOW TESTING SWITCHES: BREAKER SWITCHES - Bonneville Power Administration South Bank Substation, I-84, South of Bonneville Dam Powerhouse, Bonneville, Multnomah County, OR

  7. 3. RUSTIC BENCH AT THE LADDER CREEK GARDENS NEAR GORGE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. RUSTIC BENCH AT THE LADDER CREEK GARDENS NEAR GORGE POWERHOUSE AT NEWHALEM. J.D. ROSS HAD THE GROUNDS LANDSCAPED AND PLANTED WITH EXOTIC FLOWERS AND VEGETATION DURING THE 1930S AS AN ADDITIONAL TOURIST ATTRACTION, 1989. - Skagit Power Development, Skagit River & Newhalem Creek Hydroelectric Project, On Skagit River, Newhalem, Whatcom County, WA

  8. Hunt for Federal Funds Gives Classified Research a Lift

    ERIC Educational Resources Information Center

    Basken, Paul

    2012-01-01

    For some colleges and professors, classified research promises prestige and money. Powerhouses like the Massachusetts Institute of Technology and the Johns Hopkins University have for decades run large classified laboratories. But most other universities either do not allow such research or conduct it quietly, and in small doses. The…

  9. Inseparable Imperatives: Equity in Education and the Future of the American Economy

    ERIC Educational Resources Information Center

    DeBaun, Bill

    2012-01-01

    For most of the last sixty years, the United States has labored to provide a quality education to "all" children, regardless of their skin color or socioeconomic status. This struggle for equity in education has seldom been linked to America's position as the world's economic powerhouse and leading producer of college-educated individuals.…

  10. Increasing Learning and Reducing Costs through Technology: The University of Alabama Story

    ERIC Educational Resources Information Center

    Witkowsky, Kathy

    2008-01-01

    Long known as a college-football powerhouse, the University of Alabama (UA) is now considered a model for institutions seeking to maintain or boost their academic quality even as enrollments increase and budgets are squeezed. According to Carol Twigg, president of the National Center for Academic Transformation (NCAT), which has been a significant…

  11. 77 FR 20019 - Nuvista Light and Electric Cooperative, Inc.; Notice of Preliminary Permit Application Accepted...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-03

    ... bringing flows from the intake to a gate house; (4) a gate house and gate shaft to convey flows from the... of 13.4 MW; (7) a 100-foot-long, 75-foot-wide tailrace returning project flows to the Allen River; (8) a 118-mile long, 138-kilovolt transmission line leading from the powerhouse to a substation in...

  12. 78 FR 54884 - Antrim County; Notice of Intent To Prepare an Environmental Assessment and Notice of Scoping...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-06

    ... with sliding head gates at the powerhouse wall; (7) two Francis turbines, each with an installed... drop structures, each with 7-foot- long stop logs to control the lake level, with each drop structure... project operates in a run-of-river mode and the water surface elevation is maintained at 590.8 feet...

  13. 1. OVERALL VIEW OF SPILLWAY SHOWING BAFFLE WALL AND TAIL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. OVERALL VIEW OF SPILLWAY SHOWING BAFFLE WALL AND TAIL WATERS, WITH POWERHOUSE (MI-98-C) AND SUBSTATION (MI-98-D) AT LEFT. VIEW TO SOUTH. - Cooke Hydroelectric Plant, Spillway, Cook Dam Road at Au Sable River, Oscoda, Iosco County, MI

  14. Fish Passage: A New Tool to Investigate Fish Movement: JSATS

    SciTech Connect

    McMichael, Geoffrey A.; Harnish, Ryan A.; Weiland, Mark A.; Deng, Zhiqun; Eppard, Matthew B.

    2011-04-20

    A new system is being used to determine fish mortality issues related to hydroelectric facilities in the Pacific Northwest. Called the juvenile salmon acoustic telemetry system (JSATS), this tool allows researchers to better understand fish movement, behavior, and survival around dams and powerhouses.

  15. 75 FR 37421 - Santiam Water Control District; Notice of Application Ready for Environmental Analysis, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-29

    ... Stayton Hydropower Project would consist of the existing: (1) Power canal headgate structure and fish ladder, fish screen, and 28-inch-diameter, 600-foot-long juvenile fish bypassed return pipe located near... located just downstream of the powerhouse; (6) the 0.5-mile-long tailrace channel and tailrace...

  16. 75 FR 39680 - Santiam Water Control District; Notice of Application Ready for Environmental Analysis, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-12

    ... Hydropower Project would consist of the existing: (1) Power canal headgate structure and fish ladder, fish screen, and 28-inch-diameter, 600-foot-long juvenile fish bypassed return pipe located near the upstream... downstream of the powerhouse; (6) the 0.5-mile-long tailrace channel and tailrace fish barrier; (7) the...

  17. 26. GENERAL EXTERIOR VIEW LOOKING EAST, SHOWING FISH LADDER ON ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    26. GENERAL EXTERIOR VIEW LOOKING EAST, SHOWING FISH LADDER ON WASHINGTON SHORE ADJACENT TO UPSTREAM FACE OF THE DAM/SPILLWAY. Photograph Nos. OR-11-F-27 through OR-11-F-94 are photocopies of photographs. Original historic photographs are located at the Bonneville Powerhouse, Bonneville, Oregon. - Bonneville Project, Bonneville Dam, Columbia River, Bonneville, Multnomah County, OR

  18. 78 FR 37538 - Idaho Irrigation District; New Sweden Irrigation District; Notice of Preliminary Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-21

    ... Energy Regulatory Commission Idaho Irrigation District; New Sweden Irrigation District; Notice of... Competing Applications On April 19, 2013, the Idaho and New Sweden Irrigation Districts, filed a joint... maintaining irrigation flows; (4) a powerhouse containing a 1.2- megawatt (MW) Kaplan turbine; (5) a tailrace...

  19. View of gantry crane (manufactured by Ederer Corporation, Seattle, Wash., ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of gantry crane (manufactured by Ederer Corporation, Seattle, Wash., 1971) for Powerhouse No. 3, looking north. - Columbia Basin Project, Grand Coulee Dam & Franklin D. Roosevelt Lake, Across Columbia River, Southeast of Town of Grand Coulee, Grand Coulee, Grant County, WA

  20. At 1200 Gallery, Block 63, looking down tunnel that extends ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    At 1200 Gallery, Block 63, looking down tunnel that extends to the Right Powerhouse, showing 230 kva lines. - Columbia Basin Project, Grand Coulee Dam & Franklin D. Roosevelt Lake, Across Columbia River, Southeast of Town of Grand Coulee, Grand Coulee, Grant County, WA

  1. 76 FR 40903 - Grand River Dam Authority; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-12

    ...: Grand River Dam Authority. e. Name of Project: Salina Pumped Storage Project. f. Location: The project... relays for 161 kV line at Salina pumped storage powerhouse, and (d) installing underground 13.2 kV... hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of...

  2. Overview of MoronytoRainbow Line (background) in context with RyantoRainbow 100kV ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Overview of Morony-to-Rainbow Line (background) in context with Ryan-to-Rainbow 100kV Transmission Lines 1 and 2 (center and foreground) about three miles southwest of Morony Dam and Powerhouse. View to north - Morony Hydroelectric Facility, Morony-to-Rainbow 100 kV Transmission Line, West bank of the Missouri River, Great Falls, Cascade County, MT

  3. Overview of MoronytoRainbow Line (far left) in context with RyantoRainbow ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Overview of Morony-to-Rainbow Line (far left) in context with Ryan-to-Rainbow Lines 1 and 2 (center) about six miles southwest of Morony Dam and Powerhouse. View to east-northeast - Morony Hydroelectric Facility, Morony-to-Rainbow 100 kV Transmission Line, West bank of the Missouri River, Great Falls, Cascade County, MT

  4. Latino Workers Hitting a Blue-Collar Ceiling. New Journalism on Latino Children

    ERIC Educational Resources Information Center

    Fuller, Bruce; McElmurry, Sara

    2011-01-01

    Chicago has a dynamic history of embracing change, evolving from an agricultural and commercial hub to the steel powerhouse that would undergird America's industrial revolution. The "City of Big Shoulders" now bears a sizeable burden, one that again requires it to embrace change. The metro area must shift to an economy built on knowledge…

  5. Some Health Fads May Not Be All That Healthy

    MedlinePlus

    ... People would do better to use olive and vegetable oils in their cooking, since they contain healthy unsaturated ... Everybody is buying tubs and tubs of coconut oil, and the data behind it just ... vegetables and fruits are antioxidant-rich nutrient powerhouses," Freeman ...

  6. Integrative Literature Review: Human Capital Planning--A Review of Literature and Implications for Human Resource Development

    ERIC Educational Resources Information Center

    Zula, Kenneth J.; Chermack, Thomas J.

    2007-01-01

    The shift in the U.S. economy from a manufacturing powerhouse to a service-driven economy has placed a great emphasis on human capital planning within organizations in order to remain competitive in a new global economy. The link between critical business strategy and the successful implementation of strategy has been well documented in the…

  7. 76 FR 38383 - Ballville Hydroelectric Group, LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-30

    ...; (2) a new concrete powerhouse, 40 feet wide by 50 feet long by 30 feet deep; (3) the existing 50-foot-long by 20-foot-wide by 30-foot- deep intake structure; (4) two new 500-kilowatt Kaplan turbine...) and the instructions on the Commission's Web site ( http://www.ferc.gov/docs-filing/ferconline.asp...

  8. 63. VIEW TO SOUTHWEST IN MAIN SHEAVE VAULT: View towards ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    63. VIEW TO SOUTHWEST IN MAIN SHEAVE VAULT: View towards the southwest in the main sheave vault showing the double sheave used to deflect the California Street cable in and out of the powerhouse. - San Francisco Cable Railway, Washington & Mason Streets, San Francisco, San Francisco County, CA

  9. 21. UNDERSIDE OF EPPELSHEIMER BOTTOM GRIP: Photocopy of 1905 photograph ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    21. UNDERSIDE OF EPPELSHEIMER BOTTOM GRIP: Photocopy of 1905 photograph showing the underside of an Eppelsheimer bottom grip. The position of the cable between the jaws is clearly evident. Photograph taken at the Washington and Mason Street powerhouse. - San Francisco Cable Railway, Washington & Mason Streets, San Francisco, San Francisco County, CA

  10. 13. LONGITUDINAL VIEW OF THE SIX TURBINEGENERATOR UNITS (NO.'S 15 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. LONGITUDINAL VIEW OF THE SIX TURBINE-GENERATOR UNITS (NO.'S 1-5 ARE ORIGINAL). TURBINE-GENERATOR NO.1 IS IN THE FOREGROUND, LOOKING WEST. - Washington Water Power Company Post Falls Power Plant, Middle Channel Powerhouse & Dam, West of intersection of Spokane & Fourth Streets, Post Falls, Kootenai County, ID

  11. 33. A.C. PANEL FOR MENTONE POWER HOUSE, P.L. & P. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    33. A.C. PANEL FOR MENTONE POWER HOUSE, P.L. & P. CO., LOS ANGELES. RETRACED FROM MASSON'S DRAWING NO. C-275. JAN. 20, 1909. SCE drawing no. 52880. - Santa Ana River Hydroelectric System, SAR-3 Powerhouse, San Bernardino National Forest, Redlands, San Bernardino County, CA

  12. 84. General view of standpipes from roof of circular forebay; ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    84. General view of standpipes from roof of circular forebay; the channel in the center is part of the tailrace from the powerhouse; looking west. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power & Light Company, White River Hydroelectric Project, 600 North River Avenue, Dieringer, Pierce County, WA

  13. 40. 1911 ELECTRIC MOTOR INSTALLATION: Photocopy of July 1911 photograph ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    40. 1911 ELECTRIC MOTOR INSTALLATION: Photocopy of July 1911 photograph showing the installed 600hp General Electric motor at the Washington and Mason Streets powerhouse. View towards the south wall of the first floor. Note the engineer's shack and switchboard behind the motor and its pinion gear. - San Francisco Cable Railway, Washington & Mason Streets, San Francisco, San Francisco County, CA

  14. NORTH AND WEST SIDES OF OIL HOUSE IN RIGHT FOREGROUND, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    NORTH AND WEST SIDES OF OIL HOUSE IN RIGHT FOREGROUND, WITH EMBANKMENT (MI-100-A) IN LEFT FOREGROUND, AND POWERHOUSE (MI-100-B) AND SUBSTATION (MI-100-C) AT CENTER AND LEFT BACKGROUND. VIEW TO SOUTHEAST - Hardy Hydroelectric Plant, Oil House, 6928 East Thirty-sixth Street, Newaygo, Newaygo County, MI

  15. 6. Fire Protection (high pressure), view to the east. Located ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. Fire Protection (high pressure), view to the east. Located on the pipe floor between Unit 3 and Unit 4, the high pressure CO2 tanks are connected to the generator barrel of all four units. - Washington Water Power Clark Fork River Cabinet Gorge Hydroelectric Development, Powerhouse, North Bank of Clark Fork River at Cabinet Gorge, Cabinet, Bonner County, ID

  16. 76 FR 5584 - Valley Affordable Housing Corporation; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-01

    ... the application, can be viewed or printed on the ``eLibrary'' link of Commission's Web site at http...-foot-deep crest gate adjacent to the powerhouse; (8) two new bulb Kaplan turbines with a combined....2001(a)(1)(iii) and the instructions on the Commission's Web site at...

  17. 76 FR 19334 - Pacific Gas and Electric Company; Notice of Application Accepted for Filing, Soliciting Motions...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-07

    .... Applicant: Pacific Gas and Electric Company. e. Name of Project: French Meadows Transmission Line Project. f. Location: The French Meadows Transmission Line Project is located in Placer County, California, within the... line extending 13.27 miles from PCWA's French Meadows powerhouse switchyard to PCWA's Middle...

  18. DETAIL OF PENSTOCK ENTERING SURGE TANK AND SOUTH SIDE OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    DETAIL OF PENSTOCK ENTERING SURGE TANK AND SOUTH SIDE OF POWERHOUSE. 69-KV TRANSMISSION TOWERS WITH LIGHTENING ARRESTORS ARE SEEN ON HILLSIDE TO THE NORTH. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Elwha Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA

  19. VIEW OF HIGHTENSION ROOM ON THE TOP FLOOR OF ELWHA ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW OF HIGH-TENSION ROOM ON THE TOP FLOOR OF ELWHA POWERHOUSE LOOKING NORTH AT OVER-HEAD 69 KV BUSSING WITH METERING TRANSFORMERS. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Elwha Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA

  20. GOVERNOR FOR #3 GENERATOR INSIDE ELWHA POWERHOUSEWOODWARD WATERWHEEL GOVERNOR TYPE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    GOVERNOR FOR #3 GENERATOR INSIDE ELWHA POWERHOUSE--WOODWARD WATERWHEEL GOVERNOR TYPE HR: 21,500 LBS OF THRUST, SIZE 11 BORE & STROKE. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Elwha Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA