Science.gov

Sample records for 2011-10-01 false wiring

  1. 49 CFR 236.108 - Insulation resistance tests, wires in trunking and cables.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Insulation resistance tests, wires in trunking and... Insulation resistance tests, wires in trunking and cables. (a) Insulation resistance of wires and cables, except wires connected directly to track rails, shall be tested when wires, cables, and insulation...

  2. 47 CFR 76.806 - Pre-termination access to cable home wiring.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false Pre-termination access to cable home wiring. 76... access to cable home wiring. (a) Prior to termination of service, a customer may: install or provide for the installation of their own cable home wiring; or connect additional home wiring, splitters or...

  3. 47 CFR 32.2410 - Cable and wire facilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 2 2011-10-01 2011-10-01 false Cable and wire facilities. 32.2410 Section 32... Cable and wire facilities. This account shall be used by Class B companies to record the original cost of cable and wire facilities of the type and character required of Class A companies in Accounts...

  4. 49 CFR 236.723 - Circuit, double wire; line.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Circuit, double wire; line. 236.723 Section 236.723 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD... § 236.723 Circuit, double wire; line. An electric circuit not employing a common return wire; a...

  5. 49 CFR 234.267 - Insulation resistance tests, wires in trunking and cables.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Insulation resistance tests, wires in trunking and... STATE ACTION PLANS Maintenance, Inspection, and Testing Inspections and Tests § 234.267 Insulation resistance tests, wires in trunking and cables. (a) Insulation resistance tests shall be made when wires...

  6. 49 CFR 234.271 - Insulated rail joints, bond wires, and track connections.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Insulated rail joints, bond wires, and track... STATE ACTION PLANS Maintenance, Inspection, and Testing Inspections and Tests § 234.271 Insulated rail joints, bond wires, and track connections. Insulated rail joints, bond wires, and track connections...

  7. 46 CFR 169.679 - Wiring for power and lighting circuits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Wiring for power and lighting circuits. 169.679 Section... More on Vessels of Less Than 100 Gross Tons § 169.679 Wiring for power and lighting circuits. Wiring for each power and lighting circuit must meet subpart 111.60 of this chapter....

  8. 46 CFR 169.672 - Wiring for power and lighting circuits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Wiring for power and lighting circuits. 169.672 Section... Volts on Vessels of Less Than 100 Gross Tons § 169.672 Wiring for power and lighting circuits. (a) Wiring for power and lighting circuits must have copper conductors, of 14 AWG or larger, and— (1)...

  9. 47 CFR 32.6410 - Cable and wire facilities expenses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 2 2011-10-01 2011-10-01 false Cable and wire facilities expenses. 32.6410 Section 32.6410 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES... Cable and wire facilities expenses. Class B telephone companies shall use this account for expenses...

  10. 46 CFR 169.680 - Installation of wiring for power and lighting circuits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Installation of wiring for power and lighting circuits... and lighting circuits. (a) Wiring must be run as high as practicable above the bilges. (b) Each cable... box for use in a damp or wet location must be of watertight construction. (n) Each lighting...

  11. 46 CFR 169.673 - Installation of wiring for power and lighting circuits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Installation of wiring for power and lighting circuits. 169.673 Section 169.673 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL... power and lighting circuits. (a) Wiring must be run as high as practicable above the bilges. (b)...

  12. 47 CFR 80.334 - False distress alerts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false False distress alerts. 80.334 Section 80.334... § 80.334 False distress alerts. A distress alert is false if it was transmitted without any indication... distress alert is prohibited and may be subject to the provisions of part 1, subpart A of this chapter...

  13. 47 CFR 80.1114 - False distress alerts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false False distress alerts. 80.1114 Section 80.1114... Safety Communications § 80.1114 False distress alerts. The provisions of §§ 80.334 and 80.335 apply to false distress alerts....

  14. 42 CFR 21.23 - False statements as disqualification.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false False statements as disqualification. 21.23 Section... COMMISSIONED OFFICERS Appointment § 21.23 False statements as disqualification. Willfully false statements shall be cause for rejection of the application or, as provided in subpart N of this part, for dismissal....

  15. 42 CFR 1001.901 - False or improper claims.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 5 2011-10-01 2011-10-01 false False or improper claims. 1001.901 Section 1001.901 Public Health OFFICE OF INSPECTOR GENERAL-HEALTH CARE, DEPARTMENT OF HEALTH AND HUMAN SERVICES OIG AUTHORITIES PROGRAM INTEGRITY-MEDICARE AND STATE HEALTH CARE PROGRAMS Permissive Exclusions § 1001.901...

  16. 45 CFR 3.4 - False reports and reports of injury or damage.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 1 2011-10-01 2011-10-01 false False reports and reports of injury or damage. 3.4 Section 3.4 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION CONDUCT OF PERSONS AND TRAFFIC ON THE NATIONAL INSTITUTES OF HEALTH FEDERAL ENCLAVE General § 3.4 False reports...

  17. 47 CFR 80.335 - Procedures for canceling false distress alerts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Procedures for canceling false distress alerts..., Alarm, Urgency and Safety Procedures § 80.335 Procedures for canceling false distress alerts. If a distress alert is inadvertently transmitted, the following steps shall be taken to cancel the...

  18. 47 CFR 11.45 - Prohibition of false or deceptive EAS transmissions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false Prohibition of false or deceptive EAS transmissions. 11.45 Section 11.45 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL EMERGENCY ALERT SYSTEM (EAS) Organization § 11.45 Prohibition of false or deceptive EAS transmissions. No person...

  19. 43 CFR 20.510 - Fraud or false statements in a Government matter.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Fraud or false statements in a Government matter. 20.510 Section 20.510 Public Lands: Interior Office of the Secretary of the Interior EMPLOYEE RESPONSIBILITIES AND CONDUCT Other Employee Conduct Provisions § 20.510 Fraud or false statements in a...

  20. 45 CFR 1182.18 - Penalties for obtaining an Institute record under false pretenses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 3 2011-10-01 2011-10-01 false Penalties for obtaining an Institute record under false pretenses. 1182.18 Section 1182.18 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL FOUNDATION ON THE ARTS AND THE HUMANITIES INSTITUTE OF MUSEUM AND LIBRARY...

  1. 30 CFR 77.1802 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 77.1802 Section 77.1802... Wires and Trolley Feeder Wires § 77.1802 Insulation of trolley wires, trolley feeder wires and...

  2. 30 CFR 75.1003 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 75.1003 Section 75.1003... Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires...

  3. 30 CFR 75.1003 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 75.1003 Section 75.1003... Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires...

  4. 30 CFR 77.1802 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 77.1802 Section 77.1802... Wires and Trolley Feeder Wires § 77.1802 Insulation of trolley wires, trolley feeder wires and...

  5. 30 CFR 77.1802 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 77.1802 Section 77.1802... Wires and Trolley Feeder Wires § 77.1802 Insulation of trolley wires, trolley feeder wires and...

  6. 30 CFR 75.1003 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 75.1003 Section 75.1003... Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires...

  7. 30 CFR 75.1003 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 75.1003 Section 75.1003... Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires...

  8. 30 CFR 77.1802 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 77.1802 Section 77.1802... Wires and Trolley Feeder Wires § 77.1802 Insulation of trolley wires, trolley feeder wires and...

  9. 30 CFR 77.1802 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 77.1802 Section 77.1802... Wires and Trolley Feeder Wires § 77.1802 Insulation of trolley wires, trolley feeder wires and...

  10. 30 CFR 75.1003 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 75.1003 Section 75.1003... Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires...

  11. 43 CFR 20.510 - Fraud or false statements in a Government matter.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Fraud or false statements in a Government matter. 20.510 Section 20.510 Public Lands: Interior Office of the Secretary of the Interior EMPLOYEE RESPONSIBILITIES AND CONDUCT Other Employee Conduct Provisions § 20.510 Fraud or false statements in a...

  12. 49 CFR 236.720 - Circuit, common return.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Circuit, common return. A term applied where one wire is used for the return of more than one electric circuit. ... 49 Transportation 4 2011-10-01 2011-10-01 false Circuit, common return. 236.720 Section...

  13. 49 CFR 192.471 - External corrosion control: Test leads.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false External corrosion control: Test leads. 192.471... Control § 192.471 External corrosion control: Test leads. (a) Each test lead wire must be connected to the pipeline so as to remain mechanically secure and electrically conductive. (b) Each test lead wire must...

  14. 30 CFR 75.701-4 - Grounding wires; capacity of wires.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Grounding wires; capacity of wires. 75.701-4... SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Grounding § 75.701-4 Grounding wires; capacity of wires. Where grounding wires are used to ground metallic sheaths, armors, conduits,...

  15. 30 CFR 75.701-4 - Grounding wires; capacity of wires.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Grounding wires; capacity of wires. 75.701-4... SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Grounding § 75.701-4 Grounding wires; capacity of wires. Where grounding wires are used to ground metallic sheaths, armors, conduits,...

  16. Basic Wiring.

    ERIC Educational Resources Information Center

    Kaltwasser, Stan; And Others

    This module is the first in a series of three wiring publications; it serves as the foundation for students enrolled in a wiring program. It is a prerequisite to either "Residential Wiring" or "Commercial and Industrial Wiring." The module contains 16 instructional units that cover the following topics: occupational introduction; general safety;…

  17. False assumptions.

    PubMed

    Swaminathan, M

    1997-01-01

    Indian women do not have to be told the benefits of breast feeding or "rescued from the clutches of wicked multinational companies" by international agencies. There is no proof that breast feeding has declined in India; in fact, a 1987 survey revealed that 98% of Indian women breast feed. Efforts to promote breast feeding among the middle classes rely on such initiatives as the "baby friendly" hospital where breast feeding is promoted immediately after birth. This ignores the 76% of Indian women who give birth at home. Blaming this unproved decline in breast feeding on multinational companies distracts attention from more far-reaching and intractable effects of social change. While the Infant Milk Substitutes Act is helpful, it also deflects attention from more pressing issues. Another false assumption is that Indian women are abandoning breast feeding to comply with the demands of employment, but research indicates that most women give up employment for breast feeding, despite the economic cost to their families. Women also seek work in the informal sector to secure the flexibility to meet their child care responsibilities. Instead of being concerned about "teaching" women what they already know about the benefits of breast feeding, efforts should be made to remove the constraints women face as a result of their multiple roles and to empower them with the support of families, governmental policies and legislation, employers, health professionals, and the media. PMID:12321627

  18. 30 CFR 75.906 - Trailing cables for mobile equipment, ground wires, and ground check wires.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Trailing cables for mobile equipment, ground wires, and ground check wires. 75.906 Section 75.906 Mineral Resources MINE SAFETY AND HEALTH..., ground wires, and ground check wires. Trailing cables for mobile equipment shall contain one or...

  19. 30 CFR 75.906 - Trailing cables for mobile equipment, ground wires, and ground check wires.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Trailing cables for mobile equipment, ground wires, and ground check wires. 75.906 Section 75.906 Mineral Resources MINE SAFETY AND HEALTH..., ground wires, and ground check wires. Trailing cables for mobile equipment shall contain one or...

  20. 30 CFR 75.906 - Trailing cables for mobile equipment, ground wires, and ground check wires.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Trailing cables for mobile equipment, ground wires, and ground check wires. 75.906 Section 75.906 Mineral Resources MINE SAFETY AND HEALTH..., ground wires, and ground check wires. Trailing cables for mobile equipment shall contain one or...

  1. 30 CFR 75.906 - Trailing cables for mobile equipment, ground wires, and ground check wires.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Trailing cables for mobile equipment, ground wires, and ground check wires. 75.906 Section 75.906 Mineral Resources MINE SAFETY AND HEALTH..., ground wires, and ground check wires. Trailing cables for mobile equipment shall contain one or...

  2. 30 CFR 75.906 - Trailing cables for mobile equipment, ground wires, and ground check wires.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Trailing cables for mobile equipment, ground wires, and ground check wires. 75.906 Section 75.906 Mineral Resources MINE SAFETY AND HEALTH..., ground wires, and ground check wires. Trailing cables for mobile equipment shall contain one or...

  3. 47 CFR 76.804 - Disposition of home run wiring.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 4 2014-10-01 2014-10-01 false Disposition of home run wiring. 76.804 Section... MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Cable Inside Wiring § 76.804 Disposition of home run wiring. (a) Building-by-building disposition of home run wiring. (1) Where an MVPD owns the home run wiring in an...

  4. 47 CFR 76.804 - Disposition of home run wiring.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Disposition of home run wiring. 76.804 Section... MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Cable Inside Wiring § 76.804 Disposition of home run wiring. (a) Building-by-building disposition of home run wiring. (1) Where an MVPD owns the home run wiring in an...

  5. 47 CFR 76.804 - Disposition of home run wiring.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 4 2013-10-01 2013-10-01 false Disposition of home run wiring. 76.804 Section... MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Cable Inside Wiring § 76.804 Disposition of home run wiring. (a) Building-by-building disposition of home run wiring. (1) Where an MVPD owns the home run wiring in an...

  6. 47 CFR 76.805 - Access to molding.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false Access to molding. 76.805 Section 76.805 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Cable Inside Wiring § 76.805 Access to molding. (a) An MVPD shall be...

  7. 46 CFR 194.20-19 - Piping and electrical requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Piping and electrical requirements. 194.20-19 Section... Storerooms § 194.20-19 Piping and electrical requirements. (a) Piping, electrical equipment, and wiring shall... storeroom itself. (b) The electrical installation shall be in accordance with the applicable requirements...

  8. 46 CFR 111.60-21 - Cable insulation tests.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... IEEE 45-2002 (incorporated by reference; see 46 CFR 110.10-1). ... 46 Shipping 4 2011-10-01 2011-10-01 false Cable insulation tests. 111.60-21 Section 111.60-21...-GENERAL REQUIREMENTS Wiring Materials and Methods § 111.60-21 Cable insulation tests. All cable...

  9. 46 CFR 111.60-19 - Cable splices.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... with section 25.11 of IEEE 45-2002 (incorporated by reference; see 46 CFR 110.10-1). ... 46 Shipping 4 2011-10-01 2011-10-01 false Cable splices. 111.60-19 Section 111.60-19 Shipping... REQUIREMENTS Wiring Materials and Methods § 111.60-19 Cable splices. (a) A cable must not be spliced in...

  10. 46 CFR 111.60-4 - Minimum cable conductor size.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Minimum cable conductor size. 111.60-4 Section 111.60-4...-GENERAL REQUIREMENTS Wiring Materials and Methods § 111.60-4 Minimum cable conductor size. Each cable conductor must be #18 AWG (0.82 mm2) or larger except— (a) Each power and lighting cable conductor must...

  11. 47 CFR 32.2426 - Intrabuilding network cable.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 2 2011-10-01 2011-10-01 false Intrabuilding network cable. 32.2426 Section 32... Intrabuilding network cable. (a) This account shall include the original cost of cables and wires located on the company's side of the demarcation point or standard network interface inside subscribers' buildings...

  12. 46 CFR 111.60-13 - Flexible electric cord and cables.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... standards incorporated by reference; see 46 CFR 110.10-1). (b) Application. No flexible cord may be used... 46 Shipping 4 2011-10-01 2011-10-01 false Flexible electric cord and cables. 111.60-13 Section 111... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Wiring Materials and Methods § 111.60-13 Flexible electric cord...

  13. 49 CFR 393.22 - Combination of lighting devices and reflectors.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 5 2011-10-01 2011-10-01 false Combination of lighting devices and reflectors... Wiring § 393.22 Combination of lighting devices and reflectors. (a) Permitted combinations. Except as provided in paragraph (b) of this section, two or more lighting devices and reflectors (whether or...

  14. 46 CFR 160.073-15 - Tests.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 6 2011-10-01 2011-10-01 false Tests. 160.073-15 Section 160.073-15 Shipping COAST...-15 Tests. (a) The manufacturer shall perform a tensile test on the first three links made from a particular spool of wire. The test must be done by slowly loading the link until it breaks. The link...

  15. 49 CFR 393.30 - Battery installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 5 2011-10-01 2011-10-01 false Battery installation. 393.30 Section 393.30... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.30 Battery installation. Every storage battery on every vehicle, unless located in the engine compartment, shall be covered by...

  16. Residential Wiring.

    ERIC Educational Resources Information Center

    Taylor, Mark

    The second in a series of three curriculum packages on wiring, these materials for a five-unit course were developed to prepare postsecondary students for entry-level employment in the residential wiring trade. The five units are: (1) blueprint reading and load calculations; (2) rough-in; (3) service; (4) trim out and troubleshooting; and (5) load…

  17. Wire chamber

    DOEpatents

    Atac, Muzaffer

    1989-01-01

    A wire chamber or proportional counter device, such as Geiger-Mueller tube or drift chamber, improved with a gas mixture providing a stable drift velocity while eliminating wire aging caused by prior art gas mixtures. The new gas mixture is comprised of equal parts argon and ethane gas and having approximately 0.25% isopropyl alcohol vapor.

  18. 49 CFR 236.838 - Wire, shunt.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Wire, shunt. 236.838 Section 236.838 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION... Wire, shunt. A wire forming part of a shunt circuit....

  19. 30 CFR 57.12047 - Guy wires.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Guy wires. 57.12047 Section 57.12047 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL AND NONMETAL MINES Electricity Surface and Underground § 57.12047 Guy wires. Guy wires of...

  20. 49 CFR 393.28 - Wiring systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 5 2010-10-01 2010-10-01 false Wiring systems. 393.28 Section 393.28 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL MOTOR CARRIER SAFETY... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.28 Wiring...

  1. Wire Wise.

    ERIC Educational Resources Information Center

    Swanquist, Barry

    1998-01-01

    Discusses how today's technology is encouraging schools to invest in furnishings that are adaptable to computer use and telecommunications access. Explores issues concerning modularity, wiring management, ergonomics, durability, price, and aesthetics. (GR)

  2. 49 CFR 236.57 - Shunt and fouling wires.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Shunt and fouling wires. 236.57 Section 236.57...: All Systems Track Circuits § 236.57 Shunt and fouling wires. (a) Except as provided in paragraph (b) of this section, shunt wires and fouling wires hereafter installed or replaced shall consist of...

  3. 21 CFR 870.1330 - Catheter guide wire.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Catheter guide wire. 870.1330 Section 870.1330...) MEDICAL DEVICES CARDIOVASCULAR DEVICES Cardiovascular Diagnostic Devices § 870.1330 Catheter guide wire. (a) Identification. A catheter guide wire is a coiled wire that is designed to fit inside...

  4. 30 CFR 57.12053 - Circuits powered from trolley wires.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Circuits powered from trolley wires. 57.12053... Electricity Surface and Underground § 57.12053 Circuits powered from trolley wires. Ground wires for lighting circuits powered from trolley wires shall be connected securely to the ground return circuit. Surface Only...

  5. 47 CFR 32.2321 - Customer premises wiring.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Customer premises wiring. 32.2321 Section 32... Customer premises wiring. (a) This account shall include all amounts transferred from the former Account 232, Station Connections, inside wiring subclass. (b) Embedded Customer Premises Wiring is...

  6. 30 CFR 77.701-3 - Grounding wires; capacity.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Grounding wires; capacity. 77.701-3 Section 77... MINES Grounding § 77.701-3 Grounding wires; capacity. Where grounding wires are used to ground metallic sheaths, armors, conduits, frames, casings, and other metallic enclosures, such grounding wires will...

  7. 30 CFR 77.701-3 - Grounding wires; capacity.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Grounding wires; capacity. 77.701-3 Section 77... MINES Grounding § 77.701-3 Grounding wires; capacity. Where grounding wires are used to ground metallic sheaths, armors, conduits, frames, casings, and other metallic enclosures, such grounding wires will...

  8. No Wires.

    ERIC Educational Resources Information Center

    DeLoughry, Thomas J.

    1995-01-01

    The University of California at Santa Cruz has completed a successful test of a wireless computer network that would enable students and professors to get on line from anywhere on campus. The network, linked by radio waves, could save millions of dollars in campus wiring costs and would better meet student and faculty information needs. (MSE)

  9. 49 CFR 236.108 - Insulation resistance tests, wires in trunking and cables.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Insulation resistance tests, wires in trunking and... Insulation resistance tests, wires in trunking and cables. (a) Insulation resistance of wires and cables, except wires connected directly to track rails, shall be tested when wires, cables, and insulation...

  10. 49 CFR 236.108 - Insulation resistance tests, wires in trunking and cables.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Insulation resistance tests, wires in trunking and... Insulation resistance tests, wires in trunking and cables. (a) Insulation resistance of wires and cables, except wires connected directly to track rails, shall be tested when wires, cables, and insulation...

  11. 49 CFR 236.108 - Insulation resistance tests, wires in trunking and cables.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Insulation resistance tests, wires in trunking and... Insulation resistance tests, wires in trunking and cables. (a) Insulation resistance of wires and cables, except wires connected directly to track rails, shall be tested when wires, cables, and insulation...

  12. 49 CFR 236.108 - Insulation resistance tests, wires in trunking and cables.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Insulation resistance tests, wires in trunking and... Insulation resistance tests, wires in trunking and cables. (a) Insulation resistance of wires and cables, except wires connected directly to track rails, shall be tested when wires, cables, and insulation...

  13. Precision wire feeder for small diameter wire

    DOEpatents

    Brandon, E.D.; Hooper, F.M.; Reichenbach, M.L.

    1992-08-11

    A device for feeding small diameter wire having a diameter less than 0.04 mm (16 mil) to a welding station includes a driving wheel for controllably applying a non-deforming driving force to the wire to move the free end of the wire towards the welding station; and a tension device such as a torque motor for constantly applying a reverse force to the wire in opposition to the driving force to keep the wire taut. 1 figure.

  14. Precision wire feeder for small diameter wire

    DOEpatents

    Brandon, Eldon D.; Hooper, Frederick M.; Reichenbach, Marvin L.

    1992-01-01

    A device for feeding small diameter wire having a diameter less than 0.04 mm (16 mil) to a welding station includes a driving wheel for controllably applying a non-deforming driving force to the wire to move the free end of the wire towards the welding station; and a tension device such as a torque motor for constantly applying a reverse force to the wire in opposition to the driving force to keep the wire taut.

  15. 30 CFR 56.12047 - Guy wires.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Guy wires. 56.12047 Section 56.12047 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Electricity § 56.12047 Guy wires....

  16. 30 CFR 56.12047 - Guy wires.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Guy wires. 56.12047 Section 56.12047 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Electricity § 56.12047 Guy wires....

  17. 46 CFR 28.865 - Wiring methods and materials.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 1 2014-10-01 2014-10-01 false Wiring methods and materials. 28.865 Section 28.865 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY UNINSPECTED VESSELS REQUIREMENTS FOR COMMERCIAL FISHING INDUSTRY VESSELS Aleutian Trade Act Vessels § 28.865 Wiring methods and materials. (a) All cable and wire must have insulated, stranded...

  18. 24 CFR 3280.808 - Wiring methods and materials.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 5 2011-04-01 2011-04-01 false Wiring methods and materials. 3280... § 3280.808 Wiring methods and materials. (a) Except as specifically permitted by this part, the wiring methods and materials specified in the National Electrical Code, NFPA No. 70-2005, must be used...

  19. 30 CFR 57.12086 - Location of trolley wire.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Location of trolley wire. 57.12086 Section 57.12086 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL... Underground Only § 57.12086 Location of trolley wire. Trolley and trolley feeder wire shall be...

  20. 30 CFR 57.12086 - Location of trolley wire.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Location of trolley wire. 57.12086 Section 57.12086 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL... Underground Only § 57.12086 Location of trolley wire. Trolley and trolley feeder wire shall be...

  1. 30 CFR 57.12086 - Location of trolley wire.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Location of trolley wire. 57.12086 Section 57.12086 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL... Underground Only § 57.12086 Location of trolley wire. Trolley and trolley feeder wire shall be...

  2. 47 CFR 32.2410 - Cable and wire facilities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 2 2013-10-01 2013-10-01 false Cable and wire facilities. 32.2410 Section 32... Cable and wire facilities. This account shall be used by Class B companies to record the original cost of cable and wire facilities of the type and character required of Class A companies in Accounts...

  3. 47 CFR 32.2410 - Cable and wire facilities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 2 2012-10-01 2012-10-01 false Cable and wire facilities. 32.2410 Section 32... Cable and wire facilities. This account shall be used by Class B companies to record the original cost of cable and wire facilities of the type and character required of Class A companies in Accounts...

  4. 47 CFR 32.2410 - Cable and wire facilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Cable and wire facilities. 32.2410 Section 32... Cable and wire facilities. This account shall be used by Class B companies to record the original cost of cable and wire facilities of the type and character required of Class A companies in Accounts...

  5. 30 CFR 75.516 - Power wires; support.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Power wires; support. 75.516 Section 75.516... MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Electrical Equipment-General § 75.516 Power wires; support. All power wires (except trailing cables on mobile equipment, specially designed cables conducting...

  6. 30 CFR 57.12012 - Bare signal wires.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Bare signal wires. 57.12012 Section 57.12012 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... and Underground § 57.12012 Bare signal wires. The potential on bare signal wires accessible to...

  7. 30 CFR 57.12012 - Bare signal wires.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Bare signal wires. 57.12012 Section 57.12012 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... and Underground § 57.12012 Bare signal wires. The potential on bare signal wires accessible to...

  8. 30 CFR 57.12012 - Bare signal wires.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Bare signal wires. 57.12012 Section 57.12012 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... and Underground § 57.12012 Bare signal wires. The potential on bare signal wires accessible to...

  9. 49 CFR 236.723 - Circuit, double wire; line.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Circuit, double wire; line. 236.723 Section 236.723 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD... § 236.723 Circuit, double wire; line. An electric circuit not employing a common return wire; a...

  10. 49 CFR 236.723 - Circuit, double wire; line.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Circuit, double wire; line. 236.723 Section 236.723 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD... § 236.723 Circuit, double wire; line. An electric circuit not employing a common return wire; a...

  11. 49 CFR 236.723 - Circuit, double wire; line.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Circuit, double wire; line. 236.723 Section 236.723 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD... § 236.723 Circuit, double wire; line. An electric circuit not employing a common return wire; a...

  12. 49 CFR 236.723 - Circuit, double wire; line.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Circuit, double wire; line. 236.723 Section 236.723 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD... § 236.723 Circuit, double wire; line. An electric circuit not employing a common return wire; a...

  13. 46 CFR 129.340 - Cable and wiring.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Cable and wiring. 129.340 Section 129.340 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.340 Cable and wiring. (a) If individual wires, rather than cables, are used in systems operating at...

  14. Windows: Life after Wire.

    ERIC Educational Resources Information Center

    Razwick, Jerry

    2003-01-01

    Although wired glass is extremely common in school buildings, the International Building Code adopted new standards that eliminate the use of traditional wired glass in K-12 schools, daycare centers, and athletic facilities. Wired glass breaks easily, and the wires can cause significant injuries by forming dangerous snags when the glass breaks.…

  15. Stretched Wire Mechanics

    SciTech Connect

    Bowden, Gordon; /SLAC

    2005-09-06

    Stretched wires are beginning to play an important role in the alignment of accelerators and synchrotron light sources. Stretched wires are proposed for the alignment of the 130 meter long LCLS undulator. Wire position technology has reached sub-micron resolution yet analyses of perturbations to wire straightness are hard to find. This paper considers possible deviations of stretched wire from the simple 2-dimensional catenary form.

  16. 46 CFR 111.60-6 - Fiber optic cable.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 60332-3-22 (all three standards incorporated by reference; see 46 CFR 110.10-1); or (b) Be installed in... 46 Shipping 4 2011-10-01 2011-10-01 false Fiber optic cable. 111.60-6 Section 111.60-6 Shipping... REQUIREMENTS Wiring Materials and Methods § 111.60-6 Fiber optic cable. Each fiber optic cable must— (a)...

  17. Concealed wire tracing apparatus

    DOEpatents

    Kronberg, James W.

    1994-01-01

    An apparatus and method that combines a signal generator and a passive signal receiver to detect and record the path of partially or completely concealed electrical wiring without disturbing the concealing surface. The signal generator applies a series of electrical pulses to the selected wiring of interest. The applied pulses create a magnetic field about the wiring that can be detected by a coil contained within the signal receiver. An audible output connected to the receiver and driven by the coil reflects the receivers position with respect to the wiring. The receivers audible signal is strongest when the receiver is directly above the wiring and the long axis of the receivers coil is parallel to the wiring. A marking means is mounted on the receiver to mark the location of the wiring as the receiver is directed over the wiring's concealing surface. Numerous marks made on various locations of the concealing surface will trace the path of the wiring of interest.

  18. 47 CFR 76.806 - Pre-termination access to cable home wiring.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Pre-termination access to cable home wiring. 76... access to cable home wiring. (a) Prior to termination of service, a customer may: install or provide for the installation of their own cable home wiring; or connect additional home wiring, splitters or...

  19. Wire Test Grip Fixture

    NASA Technical Reports Server (NTRS)

    Burke, Christopher S.

    2011-01-01

    Wire-testing issues, such as the gripping strains imposed on the wire, play a critical role in obtaining clean data. In a standard test frame fitted with flat wedge grips, the gripping action alone creates stresses on the wire specimen that cause the wire to fail at the grip location. A new test frame, which is outfitted with a vacuum chamber, negated the use of any conventional commercially available wire test fixtures, as only 7 in. (17.8 cm) existed between the grip faces. An innovative grip fixture was designed to test thin gauge wire for a variety of applications in an existing Instron test frame outfitted with a vacuum chamber.

  20. Wire Detection Algorithms for Navigation

    NASA Technical Reports Server (NTRS)

    Kasturi, Rangachar; Camps, Octavia I.

    2002-01-01

    In this research we addressed the problem of obstacle detection for low altitude rotorcraft flight. In particular, the problem of detecting thin wires in the presence of image clutter and noise was studied. Wires present a serious hazard to rotorcrafts. Since they are very thin, their detection early enough so that the pilot has enough time to take evasive action is difficult, as their images can be less than one or two pixels wide. Two approaches were explored for this purpose. The first approach involved a technique for sub-pixel edge detection and subsequent post processing, in order to reduce the false alarms. After reviewing the line detection literature, an algorithm for sub-pixel edge detection proposed by Steger was identified as having good potential to solve the considered task. The algorithm was tested using a set of images synthetically generated by combining real outdoor images with computer generated wire images. The performance of the algorithm was evaluated both, at the pixel and the wire levels. It was observed that the algorithm performs well, provided that the wires are not too thin (or distant) and that some post processing is performed to remove false alarms due to clutter. The second approach involved the use of an example-based learning scheme namely, Support Vector Machines. The purpose of this approach was to explore the feasibility of an example-based learning based approach for the task of detecting wires from their images. Support Vector Machines (SVMs) have emerged as a promising pattern classification tool and have been used in various applications. It was found that this approach is not suitable for very thin wires and of course, not suitable at all for sub-pixel thick wires. High dimensionality of the data as such does not present a major problem for SVMs. However it is desirable to have a large number of training examples especially for high dimensional data. The main difficulty in using SVMs (or any other example-based learning

  1. Cable Bundle Wire Derating

    NASA Technical Reports Server (NTRS)

    Lundquist, Ray A.; Leidecker, Henning

    1998-01-01

    The allowable operating currents of electrical wiring when used in the space vacuum environment is predominantly determined by the maximum operating temperature of the wire insulation. For Kapton insulated wire this value is 200 C. Guidelines provided in the Goddard Space Flight Center (GSFC) Preferred Parts List (PPL) limit the operating current of wire within vacuum to ensure the maximum insulation temperature is not exceeded. For 20 AWG wire, these operating parameters are: 3.7 amps per wire, bundle of 15 or more wires, 70 C environment, and vacuum of 10(exp -5) torr or less. To determine the behavior and temperature of electrical wire at different operating conditions, a thermal vacuum test was performed on a representative electrical harness of the Hubble Space Telescope (HST) power distribution system. This paper describes the test and the results.

  2. Cable Bundle Wire Derating

    NASA Technical Reports Server (NTRS)

    Lundquist, Ray A.; Leidecker, Henning

    1998-01-01

    The allowable operating currents of electrical wiring when used in the space vacuum environment is predominantly determined by the maximum operating temperature of the wire insulation. For Kapton insulated wire this value is 200 C. Guidelines provided in the Goddard Space Flight Center (GSFC) Preferred Parts List (PPL) limit the operating current of wire within vacuum to ensure the maximum insulation temperature is not exceeded. For 20 AWG wire, these operating parameters are: (1) 3.7 amps per wire; (2) bundle of 15 or more wires; (3) 70 C environment: and (4) vacuum of 10(exp -5) torr or less. To determine the behavior and temperature of electrical wire at different operating conditions, a thermal vacuum test was performed on a representative electrical harness of the Hubble Space Telescope (HST) power distribution system. This paper describes the test and the results.

  3. Cable Bundle Wire Derating

    NASA Technical Reports Server (NTRS)

    Lundquist, Ray A.; Leidecker, Henning

    1999-01-01

    The allowable operating currents of electrical wiring when used in the space vacuum environment is predominantly determined by the maximum operating temperature of the wire insulation. For Kapton insulated wire this value is 200 degree C. Guidelines provided in the Goddard Space Flight Center (GSFC) Preferred Parts List (PPL) limit the operating current of wire within vacuum to ensure the maximum insulation temperature is not exceeded. For 20 AWG wire, these operating parameters are: (1) 3.7 amps per wire (2) bundle of 15 or more wires (3) 70 C environment (4) vacuum of 10(exp -5) torr or less To determine the behavior and temperature of electrical wire at different operating conditions, a thermal vacuum test was performed on a representative electrical harness of the Hubble Space Telescope (HST) power distribution system. This paper describes the test and the results.

  4. Schizotypy and false memory.

    PubMed

    Dagnall, Neil; Parker, Andrew

    2009-03-01

    Using the Deese-Roediger-McDermott (DRM) paradigm the present study examined the relationship between schizotypy and recognition memory. Participants scoring in the upper and lower quartile ranges for schizotypy (Schizotypal Personality Questionnaire brief version; SPQ-B) and on each of the SPQ-B subscales (cognitive-perceptual, interpersonal and disorganized) were compared on true and false memory performance. Participants scoring in the lower quartile range on the cognitive-perceptual subscale recognised a higher proportion of both true and false memories than those scoring in the higher quartile range. Participants scoring in the upper quartile on the interpersonal factor recognised fewer true items than those in the lower quartile range. No differences were found for overall schizotypy or on the disorganized subscale. PMID:18817907

  5. Laser Wire Stripper

    NASA Technical Reports Server (NTRS)

    1983-01-01

    NASA-developed space shuttle technology is used in a laser wire stripper designed by Raytheon Company. Laser beams cut through insulation on a wire without damaging conductive metal, because laser radiation that melts plastic insulation is reflected by the metal. The laser process is fast, clean, precise and repeatable. It eliminates quality control problems and the expense of rejected wiring.

  6. Moon - False Color Mosaic

    NASA Technical Reports Server (NTRS)

    1992-01-01

    This false-color photograph is a composite of 15 images of the Moon taken through three color filters by Galileo's solid-state imaging system during the spacecraft's passage through the Earth-Moon system on December 8, 1992. When this view was obtained, the spacecraft was 425,000 kilometers (262,000 miles) from the Moon and 69,000 kilometers (43,000 miles) from Earth. The false-color processing used to create this lunar image is helpful for interpreting the surface soil composition. Areas appearing red generally correspond to the lunar highlands, while blue to orange shades indicate the ancient volcanic lava flow of a mare, or lunar sea. Bluer mare areas contain more titanium than do the orange regions. Mare Tranquillitatis, seen as a deep blue patch on the right, is richer in titanium than Mare Serenitatis, a slightly smaller circular area immediately adjacent to the upper left of Mare Tranquillitatis. Blue and orange areas covering much of the left side of the Moon in this view represent many separate lava flows in Oceanus Procellarum. The small purple areas found near the center are pyroclastic deposits formed by explosive volcanic eruptions. The fresh crater Tycho, with a diameter of 85 kilometers (53 miles), is prominent at the bottom of the photograph, where part of the Moon's disk is missing.

  7. In-Situ Wire Damage Detection System

    NASA Technical Reports Server (NTRS)

    Williams, Martha; Roberson, Luke; Tate, Lanetra; Smith, Trent; Gibson, Tracy; Medelius, Pedro; Jolley, Scott

    2012-01-01

    An In-Situ Wire Damage Detection System (ISWDDS) has been developed that is capable of detecting damage to a wire insulation, or a wire conductor, or to both. The system will allow for realtime, continuous monitoring of wiring health/integrity and reduce the number of false negatives and false positives while being smaller, lighter in weight, and more robust than current systems. The technology allows for improved safety and significant reduction in maintenance hours for aircraft, space vehicles, satellites, and other critical high-performance wiring systems for industries such as energy production and mining. The integrated ISWDDS is comprised of two main components: (1) a wire with an innermost core conductor, an inner insulation film, a conductive layer or inherently conductive polymer (ICP) covering the inner insulation film, an outermost insulation jacket; and (2) smart connectors and electronics capable of producing and detecting electronic signals, and a central processing unit (CPU) for data collection and analysis. The wire is constructed by applying the inner insulation films to the conductor, followed by the outer insulation jacket. The conductive layer or ICP is on the outer surface of the inner insulation film. One or more wires are connected to the CPU using the smart connectors, and up to 64 wires can be monitored in real-time. The ISWDDS uses time domain reflectometry for damage detection. A fast-risetime pulse is injected into either the core conductor or conductive layer and referenced against the other conductor, producing transmission line behavior. If either conductor is damaged, then the signal is reflected. By knowing the speed of propagation of the pulse, and the time it takes to reflect, one can calculate the distance to and location of the damage.

  8. False color viewing device

    DOEpatents

    Kronberg, James W.

    1992-01-01

    A viewing device for observing objects in near-infrared false-color comprising a pair of goggles with one or more filters in the apertures, and pads that engage the face for blocking stray light from the sides so that all light reaching the user's eyes come through the filters. The filters attenuate most visible light and pass near-infrared (having wavelengths longer than approximately 700 nm) and a small amount of blue-green and blue-violet (having wavelengths in the 500 to 520 nm and shorter than 435 nm, respectively). The goggles are useful for looking at vegetation to identify different species and for determining the health of the vegetation, and to detect some forms of camouflage.

  9. Callisto False Color

    NASA Technical Reports Server (NTRS)

    1979-01-01

    This false color picture of Callisto was taken by Voyager 2 on July 7, 1979 at a range of 1,094,666 kilometers (677,000 miles) and is centered on 11 degrees N and 171 degrees W. This rendition uses an ultraviolet image for the blue component. Because the surface displays regional contrast in UV, variations in surface materials are apparent. Notice in particular the dark blue haloes which surround bright craters in the eastern hemisphere. The surface of Callisto is the most heavily cratered of the Galilean satellites and resembles ancient heavily cratered terrains on the moon, Mercury and Mars. The bright areas are ejecta thrown out by relatively young impact craters. A large ringed structure, probably an impact basin, is shown in the upper left part of the picture. The color version of this picture was constructed by compositing black and white images taken through the ultraviolet, clear and orange filters.

  10. False color viewing device

    DOEpatents

    Kronberg, J.W.

    1992-10-20

    A viewing device for observing objects in near-infrared false-color comprising a pair of goggles with one or more filters in the apertures, and pads that engage the face for blocking stray light from the sides so that all light reaching the user's eyes come through the filters. The filters attenuate most visible light and pass near-infrared (having wavelengths longer than approximately 700 nm) and a small amount of blue-green and blue-violet (having wavelengths in the 500 to 520 nm and shorter than 435 nm, respectively). The goggles are useful for looking at vegetation to identify different species and for determining the health of the vegetation, and to detect some forms of camouflage. 7 figs.

  11. False color viewing device

    DOEpatents

    Kronberg, J.W.

    1991-05-08

    This invention consists of a viewing device for observing objects in near-infrared false-color comprising a pair of goggles with one or more filters in the apertures, and pads that engage the face for blocking stray light from the sides so that all light reaching, the user`s eyes come through the filters. The filters attenuate most visible light and pass near-infrared (having wavelengths longer than approximately 700 nm) and a small amount of blue-green and blue-violet (having wavelengths in the 500 to 520 nm and shorter than 435 nm, respectively). The goggles are useful for looking at vegetation to identify different species and for determining the health of the vegetation, and to detect some forms of camouflage.

  12. Neptune in False Color

    NASA Technical Reports Server (NTRS)

    1989-01-01

    In this false color image of Neptune, objects that are deep in the atmosphere are blue, while those at higher altitudes are white. The image was taken by Voyager 2's wide-angle camera through an orange filter and two different methane filters. Light at methane wavelengths is mostly absorbed in the deeper atmosphere. The bright, white feature is a high altitude cloud just south of the Great Dark Spot. The hard, sharp inner boundary within the bright cloud is an artifact of computer processing on Earth. Other, smaller clouds associated with the Great Dark Spot are white or pink, and are also at high altitudes. Neptune's limb looks reddish because Voyager 2 is viewing it tangentially, and the sunlight is scattered back to space before it can be absorbed by the methane. A long, narrow band of high altitude clouds near the top of the image is located at 25 degrees north latitude, and faint hazes mark the equator and polar regions. The Voyager Mission is conducted by JPL for NASA's Office of Space Science and Applications.

  13. False Color Aurora

    NASA Technical Reports Server (NTRS)

    1997-01-01

    Data from NASA's Galileo spacecraft were used to produce this false-color composite of Jupiter's northern aurora on the night side of the planet. The height of the aurora, the thickness of the auroral arc, and the small-scale structure are revealed for the first time. Images in Galileo's red, green, and clear filters are displayed in red, green, and blue respectively. The smallest resolved features are tens of kilometers in size, which is a ten-fold improvement over Hubble Space Telescope images and a hundred-fold improvement over ground-based images.

    The glow is caused by electrically charged particles impinging on the atmosphere from above. The particles travel along Jupiter's magnetic field lines, which are nearly vertical at this latitude. The auroral arc marks the boundary between the 'closed' field lines that are attached to the planet at both ends and the 'open' field lines that extend out into interplanetary space. At the boundary the particles have been accelerated over the greatest distances, and the glow is especially intense.

    The latitude-longitude lines refer to altitudes where the pressure is 1 bar. The image shows that the auroral emissions originate about 500 kilometers (about 310 miles) above this surface. The colored background is light scattered from Jupiter's bright crescent, which is out of view to the right. North is at the top. The images are centered at 57 degrees north and 184 degrees west and were taken on April 2, 1997 at a range of 1.7 million kilometers (1.05 million miles) by Galileo's Solid State Imaging (SSI) system.

    The Jet Propulsion Laboratory, Pasadena, CA manages the mission for NASA's Office of Space Science, Washington, DC.

    This image and other images and data received from Galileo are posted on the World Wide Web, on the Galileo mission home page at: http:// galileo.jpl.nasa.gov. Background information and educational context for the images can be found at: http:/ /www.jpl.nasa.gov/galileo/sepo.

  14. Thin wire pointing method

    NASA Technical Reports Server (NTRS)

    Green, G.; Mattauch, R. J. (Inventor)

    1983-01-01

    A method is described for forming sharp tips on thin wires, in particular phosphor bronze wires of diameters such as one-thousandth inch used to contact micron size Schottky barrier diodes, which enables close control of tip shape and which avoids the use of highly toxic solutions. The method includes dipping an end of a phosphor bronze wire into a dilute solution of sulfamic acid and applying a current through the wire to electrochemically etch it. The humidity in the room is controlled to a level of less than 50%, and the voltage applied between the wire and another electrode in the solutions is a half wave rectified voltage. The current through the wire is monitored, and the process is stopped when the current falls to a predetermined low level.

  15. Sintered wire annode

    DOEpatents

    Falce, Louis R.; Ives, R. Lawrence

    2007-12-25

    A plurality of high atomic number wires are sintered together to form a porous rod that is parted into porous disks which will be used as x-ray targets. A thermally conductive material is introduced into the pores of the rod, and when a stream of electrons impinges on the sintered wire target and generates x-rays, the heat generated by the impinging x-rays is removed by the thermally conductive material interspersed in the pores of the wires.

  16. Zinc wired rebar

    SciTech Connect

    Zhang, X.G.; Hwang, J.

    1997-02-01

    A novel method for corrosion protection of rebar in concrete is reported wherein it is galvanically protected by attaching a zinc wire along its length. The self-corrosion and galvanic-corrosion loss of the zinc wire is dependent on the water/cement ratio, the size of the cathode, and the concrete cover thickness. The wire acts as a sacrificial anode when the rebar embedded in concrete is exposed to corrosive environments.

  17. Concealed wire tracing apparatus

    DOEpatents

    Kronberg, J.W.

    1994-05-31

    An apparatus and method that combines a signal generator and a passive signal receiver to detect and record the path of partially or completely concealed electrical wiring without disturbing the concealing surface is disclosed. The signal generator applies a series of electrical pulses to the selected wiring of interest. The applied pulses create a magnetic field about the wiring that can be detected by a coil contained within the signal receiver. An audible output connected to the receiver and driven by the coil reflects the receivers position with respect to the wiring. The receivers audible signal is strongest when the receiver is directly above the wiring and the long axis of the receivers coil is parallel to the wiring. A marking means is mounted on the receiver to mark the location of the wiring as the receiver is directed over the wiring's concealing surface. Numerous marks made on various locations of the concealing surface will trace the path of the wiring of interest. 4 figs.

  18. Weld Wire Investigation Summary

    SciTech Connect

    Cunningham, M.A.

    1999-03-22

    After GTA welding reservoir A production/process prove-in assemblies, X-ray examination detected a lack of sidewall fusion. After examining several possible causes, it was determined that the weld wire filler metal was responsible, particularly the wire cleaning process. The final conclusion was that the filler wire must be abrasively cleaned in a particular manner to perform as required. The abrasive process was incorporated into the wire material specification, ensuring consistency for all reservoir GTA welding at AlliedSignal Federal Manufacturing and Technologies (FM and T).

  19. Wire-inhomogeneity detector

    DOEpatents

    Gibson, G.H.; Smits, R.G.; Eberhard, P.H.

    1982-08-31

    A device for uncovering imperfections in electrical conducting wire, particularly superconducting wire, by detecting variations in eddy currents. Eddy currents effect the magnetic field in a gap of an inductor, contained in a modified commercial ferrite core, through which the wire being tested is passed. A small increase or decrease in the amount of conductive material, such as copper, in a fixed cross section of wire will unbalance a bridge used to measure the impedance of the inductor, tripping a detector and sounding an alarm.

  20. 1998 wire development workshop proceedings

    SciTech Connect

    1998-04-01

    This report consists of vugraphs of the presentations at the conference. The conference was divided into the following sessions: (1) First Generation Wire Development: Status and Issues; (2) First Generation Wire in Pre-Commercial Prototypes; (3) Second Generation Wire Development: Private Sector Progress and Issues; (4) Second Generation Wire Development: Federal Laboratories; and (5) Fundamental Research Issues for HTS Wire Development.

  1. VIEW SOUTHEASTBUILDING 4 NO. 1 WIRE MILL (1871) WIRE DRAWING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW SOUTHEAST-BUILDING 4 NO. 1 WIRE MILL (1871) WIRE DRAWING MACHINE - John A. Roebling's Sons Company & American Steel & Wire Company, South Broad, Clark, Elmer, Mott & Hudson Streets, Trenton, Mercer County, NJ

  2. Wire Array Photovoltaics

    NASA Astrophysics Data System (ADS)

    Turner-Evans, Dan

    Over the past five years, the cost of solar panels has dropped drastically and, in concert, the number of installed modules has risen exponentially. However, solar electricity is still more than twice as expensive as electricity from a natural gas plant. Fortunately, wire array solar cells have emerged as a promising technology for further lowering the cost of solar. Si wire array solar cells are formed with a unique, low cost growth method and use 100 times less material than conventional Si cells. The wires can be embedded in a transparent, flexible polymer to create a free-standing array that can be rolled up for easy installation in a variety of form factors. Furthermore, by incorporating multijunctions into the wire morphology, higher efficiencies can be achieved while taking advantage of the unique defect relaxation pathways afforded by the 3D wire geometry. The work in this thesis shepherded Si wires from undoped arrays to flexible, functional large area devices and laid the groundwork for multijunction wire array cells. Fabrication techniques were developed to turn intrinsic Si wires into full p-n junctions and the wires were passivated with a-Si:H and a-SiNx:H. Single wire devices yielded open circuit voltages of 600 mV and efficiencies of 9%. The arrays were then embedded in a polymer and contacted with a transparent, flexible, Ni nanoparticle and Ag nanowire top contact. The contact connected >99% of the wires in parallel and yielded flexible, substrate free solar cells featuring hundreds of thousands of wires. Building on the success of the Si wire arrays, GaP was epitaxially grown on the material to create heterostructures for photoelectrochemistry. These cells were limited by low absorption in the GaP due to its indirect bandgap, and poor current collection due to a diffusion length of only 80 nm. However, GaAsP on SiGe offers a superior combination of materials, and wire architectures based on these semiconductors were investigated for multijunction

  3. 47 CFR 32.6410 - Cable and wire facilities expenses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 2 2012-10-01 2012-10-01 false Cable and wire facilities expenses. 32.6410 Section 32.6410 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES... Cable and wire facilities expenses. Class B telephone companies shall use this account for expenses...

  4. 47 CFR 32.6410 - Cable and wire facilities expenses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Cable and wire facilities expenses. 32.6410 Section 32.6410 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES... Cable and wire facilities expenses. Class B telephone companies shall use this account for expenses...

  5. 47 CFR 32.6410 - Cable and wire facilities expenses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 2 2013-10-01 2013-10-01 false Cable and wire facilities expenses. 32.6410 Section 32.6410 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES... Cable and wire facilities expenses. Class B telephone companies shall use this account for expenses...

  6. 29 CFR 1910.304 - Wiring design and protection.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 5 2014-07-01 2014-07-01 false Wiring design and protection. 1910.304 Section 1910.304 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Design Safety Standards for Electrical Systems § 1910.304 Wiring design and...

  7. 29 CFR 1926.404 - Wiring design and protection.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 8 2014-07-01 2014-07-01 false Wiring design and protection. 1926.404 Section 1926.404 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Electrical Installation Safety Requirements § 1926.404 Wiring design...

  8. 29 CFR 1910.304 - Wiring design and protection.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 5 2011-07-01 2011-07-01 false Wiring design and protection. 1910.304 Section 1910.304 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Design Safety Standards for Electrical Systems § 1910.304 Wiring design and...

  9. 29 CFR 1910.304 - Wiring design and protection.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 5 2010-07-01 2010-07-01 false Wiring design and protection. 1910.304 Section 1910.304 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Design Safety Standards for Electrical Systems § 1910.304 Wiring design and...

  10. 7 CFR 1755.506 - Aerial wire services

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Aerial wire services 1755.506 Section 1755.506 Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE TELECOMMUNICATIONS POLICIES ON SPECIFICATIONS, ACCEPTABLE MATERIALS, AND STANDARD CONTRACT FORMS § 1755.506 Aerial wire services...

  11. 29 CFR 1926.404 - Wiring design and protection.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 8 2010-07-01 2010-07-01 false Wiring design and protection. 1926.404 Section 1926.404... Requirements § 1926.404 Wiring design and protection. (a) Use and identification of grounded and grounding...) Power conductors below communication conductors—30 inches (762 mm) . (B) Power conductors alone or...

  12. 21 CFR 872.4880 - Intraosseous fixation screw or wire.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Intraosseous fixation screw or wire. 872.4880 Section 872.4880 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES.... (a) Identification. An intraosseous fixation screw or wire is a metal device intended to be...

  13. 24 CFR 3280.814 - Painting of wiring.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 5 2011-04-01 2011-04-01 false Painting of wiring. 3280.814... Painting of wiring. During painting or staining of the manufactured home, it shall be permitted to paint... cable. Some arrangement, however, shall be made so that no paint shall be applied to the...

  14. 24 CFR 3280.814 - Painting of wiring.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 5 2014-04-01 2014-04-01 false Painting of wiring. 3280.814... Painting of wiring. During painting or staining of the manufactured home, it shall be permitted to paint... cable. Some arrangement, however, shall be made so that no paint shall be applied to the...

  15. 24 CFR 3280.814 - Painting of wiring.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 5 2013-04-01 2013-04-01 false Painting of wiring. 3280.814... Painting of wiring. During painting or staining of the manufactured home, it shall be permitted to paint... cable. Some arrangement, however, shall be made so that no paint shall be applied to the...

  16. 24 CFR 3280.814 - Painting of wiring.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Painting of wiring. 3280.814... Painting of wiring. During painting or staining of the manufactured home, it shall be permitted to paint... cable. Some arrangement, however, shall be made so that no paint shall be applied to the...

  17. 24 CFR 3280.814 - Painting of wiring.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 5 2012-04-01 2012-04-01 false Painting of wiring. 3280.814... Painting of wiring. During painting or staining of the manufactured home, it shall be permitted to paint... cable. Some arrangement, however, shall be made so that no paint shall be applied to the...

  18. 29 CFR 1919.33 - Proof tests-wire rope.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 7 2011-07-01 2011-07-01 false Proof tests-wire rope. 1919.33 Section 1919.33 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) GEAR CERTIFICATION Certification of Vessels: Tests and Proof Loads; Heat Treatment; Competent Persons § 1919.33 Proof tests—wire...

  19. Commercial and Industrial Wiring.

    ERIC Educational Resources Information Center

    Kaltwasser, Stan; Flowers, Gary

    This module is the third in a series of three wiring publications, includes additional technical knowledge and applications required for job entry in the commercial and industrial wiring trade. The module contains 15 instructional units that cover the following topics: blueprint reading and load calculations; tools and equipment; service;…

  20. 2016 MOST WIRED.

    PubMed

    Barr, Paul; Butcher, Lola; Hoppszallern, Suzanna

    2016-07-01

    This year's IT survey shows that hospitals are aggressively fighting cyber crime and looking for ways to use data to help in the transition to value-based care. Find out who made the 2016 lists of Most Wired, Most Advanced, Most Improved and Most Wired-Small and Rural. PMID:27526506

  1. The exploding wire phenomenon

    NASA Astrophysics Data System (ADS)

    Aspden, H.

    1985-02-01

    Graneau's recent interpretation of the exploding wire phenomenon as an electrodynamic effect verifying Ampère's classical formulation is questioned. Instead, it is shown that the rupturing force arising from the imbalance of the self-induced electromotive force and the ohmic potential during an explosive current surge will account for the wire breaking into several segments, as is observed.

  2. 49 CFR 234.239 - Tagging of wires and interference of wires or tags with signal apparatus.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Tagging of wires and interference of wires or tags with signal apparatus. 234.239 Section 234.239 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION GRADE CROSSING SAFETY, INCLUDING SIGNAL SYSTEMS, STATE ACTION...

  3. Water Desalination with Wires.

    PubMed

    Porada, S; Sales, B B; Hamelers, H V M; Biesheuvel, P M

    2012-06-21

    We show the significant potential of water desalination using a novel capacitive wire-based technology in which anode/cathode wire pairs are constructed from coating a thin porous carbon electrode layer on top of electrically conducting rods (or wires). By alternately dipping an array of electrode pairs in freshwater with and in brine without an applied cell voltage, we create an ion adsorption/desorption cycle. We show experimentally how in six subsequent cycles we can reduce the salinity of 20 mM feed (brackish) water by a factor of 3, while application of a cation exchange membrane on the cathode wires makes the desalination factor increase to 4. Theoretical modeling rationalizes the experimental findings, and predicts that system performance can be significantly enhanced by material modifications. To treat large volumes of water, multiple stacks of wire pairs can be used simultaneously in a "merry-go-round" operational mode. PMID:26285717

  4. Diabetes: What's True and False?

    MedlinePlus

    ... How Can I Help a Friend Who Cuts? Diabetes: What's True and False? KidsHealth > For Teens > Diabetes: ... which are false. Eating too much sugar causes diabetes. False: Type 1 diabetes happens when the cells ...

  5. Diabetes: What's True and False?

    MedlinePlus

    ... Sledding, Skiing, Snowboarding, Skating Crushes What's a Booger? Diabetes: What's True and False? KidsHealth > For Kids > Diabetes: ... True or False: Eating Too Much Sugar Causes Diabetes False: When kids get type 1 diabetes , it's ...

  6. International space station wire program

    NASA Technical Reports Server (NTRS)

    May, Todd

    1995-01-01

    Hardware provider wire systems and current wire insulation issues for the International Space Station (ISS) program are discussed in this viewgraph presentation. Wire insulation issues include silicone wire contamination, Tefzel cold temperature flexibility, and Russian polyimide wire insulation. ISS is a complex program with hardware developed and managed by many countries and hundreds of contractors. Most of the obvious wire insulation issues are known by contractors and have been precluded by proper selection.

  7. Next Generation Wiring

    NASA Technical Reports Server (NTRS)

    Medelius, Petro; Jolley, Scott; Fitzpatrick, Lilliana; Vinje, Rubiela; Williams, Martha; Clayton, LaNetra; Roberson, Luke; Smith, Trent; Santiago-Maldonado, Edgardo

    2007-01-01

    Wiring is a major operational component on aerospace hardware that accounts for substantial weight and volumetric space. Over time wire insulation can age and fail, often leading to catastrophic events such as system failure or fire. The next generation of wiring must be reliable and sustainable over long periods of time. These features will be achieved by the development of a wire insulation capable of autonomous self-healing that mitigates failure before it reaches a catastrophic level. In order to develop a self-healing insulation material, three steps must occur. First, methods of bonding similar materials must be developed that are capable of being initiated autonomously. This process will lead to the development of a manual repair system for polyimide wire insulation. Second, ways to initiate these bonding methods that lead to materials that are similar to the primary insulation must be developed. Finally, steps one and two must be integrated to produce a material that has no residues from the process that degrades the insulating properties of the final repaired insulation. The self-healing technology, teamed with the ability to identify and locate damage, will greatly improve reliability and safety of electrical wiring of critical systems. This paper will address these topics, discuss the results of preliminary testing, and remaining development issues related to self-healing wire insulation.

  8. 30 CFR 75.517 - Power wires and cables; insulation and protection.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Power wires and cables; insulation and protection. 75.517 Section 75.517 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF...-General § 75.517 Power wires and cables; insulation and protection. Power wires and cables, except...

  9. 30 CFR 56.12008 - Insulation and fittings for power wires and cables.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Insulation and fittings for power wires and cables. 56.12008 Section 56.12008 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF... MINES Electricity § 56.12008 Insulation and fittings for power wires and cables. Power wires and...

  10. 30 CFR 75.517 - Power wires and cables; insulation and protection.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Power wires and cables; insulation and protection. 75.517 Section 75.517 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF...-General § 75.517 Power wires and cables; insulation and protection. Power wires and cables, except...

  11. 30 CFR 75.517-1 - Power wires and cables; insulation and protection.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Power wires and cables; insulation and...-General § 75.517-1 Power wires and cables; insulation and protection. Power wires and cables installed on or after March 30, 1970, shall have insulation with a dielectric strength at least equal to...

  12. 30 CFR 75.517-1 - Power wires and cables; insulation and protection.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Power wires and cables; insulation and...-General § 75.517-1 Power wires and cables; insulation and protection. Power wires and cables installed on or after March 30, 1970, shall have insulation with a dielectric strength at least equal to...

  13. 30 CFR 75.517 - Power wires and cables; insulation and protection.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Power wires and cables; insulation and protection. 75.517 Section 75.517 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF...-General § 75.517 Power wires and cables; insulation and protection. Power wires and cables, except...

  14. 49 CFR 234.267 - Insulation resistance tests, wires in trunking and cables.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Insulation resistance tests, wires in trunking and... STATE ACTION PLANS Maintenance, Inspection, and Testing Inspections and Tests § 234.267 Insulation resistance tests, wires in trunking and cables. (a) Insulation resistance tests shall be made when wires...

  15. 30 CFR 56.12008 - Insulation and fittings for power wires and cables.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Insulation and fittings for power wires and cables. 56.12008 Section 56.12008 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF... MINES Electricity § 56.12008 Insulation and fittings for power wires and cables. Power wires and...

  16. 30 CFR 75.517 - Power wires and cables; insulation and protection.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Power wires and cables; insulation and protection. 75.517 Section 75.517 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF...-General § 75.517 Power wires and cables; insulation and protection. Power wires and cables, except...

  17. 30 CFR 56.12008 - Insulation and fittings for power wires and cables.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Insulation and fittings for power wires and cables. 56.12008 Section 56.12008 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF... MINES Electricity § 56.12008 Insulation and fittings for power wires and cables. Power wires and...

  18. 30 CFR 75.517-1 - Power wires and cables; insulation and protection.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Power wires and cables; insulation and...-General § 75.517-1 Power wires and cables; insulation and protection. Power wires and cables installed on or after March 30, 1970, shall have insulation with a dielectric strength at least equal to...

  19. 30 CFR 75.517-1 - Power wires and cables; insulation and protection.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Power wires and cables; insulation and...-General § 75.517-1 Power wires and cables; insulation and protection. Power wires and cables installed on or after March 30, 1970, shall have insulation with a dielectric strength at least equal to...

  20. 30 CFR 75.517 - Power wires and cables; insulation and protection.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Power wires and cables; insulation and protection. 75.517 Section 75.517 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF...-General § 75.517 Power wires and cables; insulation and protection. Power wires and cables, except...

  1. 30 CFR 56.12008 - Insulation and fittings for power wires and cables.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Insulation and fittings for power wires and cables. 56.12008 Section 56.12008 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF... MINES Electricity § 56.12008 Insulation and fittings for power wires and cables. Power wires and...

  2. 30 CFR 75.517-1 - Power wires and cables; insulation and protection.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Power wires and cables; insulation and...-General § 75.517-1 Power wires and cables; insulation and protection. Power wires and cables installed on or after March 30, 1970, shall have insulation with a dielectric strength at least equal to...

  3. 30 CFR 56.12008 - Insulation and fittings for power wires and cables.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Insulation and fittings for power wires and cables. 56.12008 Section 56.12008 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF... MINES Electricity § 56.12008 Insulation and fittings for power wires and cables. Power wires and...

  4. 30 CFR 77.508-1 - Lightning arresters; wires entering buildings.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Lightning arresters; wires entering buildings... OF UNDERGROUND COAL MINES Electrical Equipment-General § 77.508-1 Lightning arresters; wires entering buildings. Lightning arresters protecting exposed telephone wires entering buildings shall be provided...

  5. 30 CFR 77.508-1 - Lightning arresters; wires entering buildings.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Lightning arresters; wires entering buildings... OF UNDERGROUND COAL MINES Electrical Equipment-General § 77.508-1 Lightning arresters; wires entering buildings. Lightning arresters protecting exposed telephone wires entering buildings shall be provided...

  6. 30 CFR 77.508-1 - Lightning arresters; wires entering buildings.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Lightning arresters; wires entering buildings... OF UNDERGROUND COAL MINES Electrical Equipment-General § 77.508-1 Lightning arresters; wires entering buildings. Lightning arresters protecting exposed telephone wires entering buildings shall be provided...

  7. 30 CFR 77.508-1 - Lightning arresters; wires entering buildings.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Lightning arresters; wires entering buildings... OF UNDERGROUND COAL MINES Electrical Equipment-General § 77.508-1 Lightning arresters; wires entering buildings. Lightning arresters protecting exposed telephone wires entering buildings shall be provided...

  8. 30 CFR 77.508-1 - Lightning arresters; wires entering buildings.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Lightning arresters; wires entering buildings... OF UNDERGROUND COAL MINES Electrical Equipment-General § 77.508-1 Lightning arresters; wires entering buildings. Lightning arresters protecting exposed telephone wires entering buildings shall be provided...

  9. 30 CFR 57.12066 - Guarding trolley wires and bare powerlines.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Guarding trolley wires and bare powerlines. 57... MINES Electricity Surface Only § 57.12066 Guarding trolley wires and bare powerlines. Where metallic tools or equipment can come in contact with trolley wires or bare powerlines, the lines shall be...

  10. 30 CFR 56.12066 - Guarding trolley wires and bare powerlines.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Guarding trolley wires and bare powerlines. 56... Electricity § 56.12066 Guarding trolley wires and bare powerlines. Where metallic tools or equipment can come in contact with trolley wires or bare powerlines, the lines shall be guarded or deenergized....

  11. 30 CFR 56.12066 - Guarding trolley wires and bare powerlines.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Guarding trolley wires and bare powerlines. 56... Electricity § 56.12066 Guarding trolley wires and bare powerlines. Where metallic tools or equipment can come in contact with trolley wires or bare powerlines, the lines shall be guarded or deenergized....

  12. 30 CFR 77.515 - Bare signal or control wires; voltage.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Bare signal or control wires; voltage. 77.515... COAL MINES Electrical Equipment-General § 77.515 Bare signal or control wires; voltage. The voltage on bare signal or control wires accessible to personal contact shall not exceed 40 volts....

  13. 30 CFR 77.515 - Bare signal or control wires; voltage.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Bare signal or control wires; voltage. 77.515... COAL MINES Electrical Equipment-General § 77.515 Bare signal or control wires; voltage. The voltage on bare signal or control wires accessible to personal contact shall not exceed 40 volts....

  14. 30 CFR 56.12066 - Guarding trolley wires and bare powerlines.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Guarding trolley wires and bare powerlines. 56... Electricity § 56.12066 Guarding trolley wires and bare powerlines. Where metallic tools or equipment can come in contact with trolley wires or bare powerlines, the lines shall be guarded or deenergized....

  15. 30 CFR 77.515 - Bare signal or control wires; voltage.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Bare signal or control wires; voltage. 77.515... COAL MINES Electrical Equipment-General § 77.515 Bare signal or control wires; voltage. The voltage on bare signal or control wires accessible to personal contact shall not exceed 40 volts....

  16. 30 CFR 56.12066 - Guarding trolley wires and bare powerlines.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Guarding trolley wires and bare powerlines. 56... Electricity § 56.12066 Guarding trolley wires and bare powerlines. Where metallic tools or equipment can come in contact with trolley wires or bare powerlines, the lines shall be guarded or deenergized....

  17. 30 CFR 56.12066 - Guarding trolley wires and bare powerlines.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Guarding trolley wires and bare powerlines. 56... Electricity § 56.12066 Guarding trolley wires and bare powerlines. Where metallic tools or equipment can come in contact with trolley wires or bare powerlines, the lines shall be guarded or deenergized....

  18. 30 CFR 57.12066 - Guarding trolley wires and bare powerlines.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Guarding trolley wires and bare powerlines. 57... MINES Electricity Surface Only § 57.12066 Guarding trolley wires and bare powerlines. Where metallic tools or equipment can come in contact with trolley wires or bare powerlines, the lines shall be...

  19. 30 CFR 77.515 - Bare signal or control wires; voltage.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Bare signal or control wires; voltage. 77.515... COAL MINES Electrical Equipment-General § 77.515 Bare signal or control wires; voltage. The voltage on bare signal or control wires accessible to personal contact shall not exceed 40 volts....

  20. 30 CFR 57.12066 - Guarding trolley wires and bare powerlines.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Guarding trolley wires and bare powerlines. 57... MINES Electricity Surface Only § 57.12066 Guarding trolley wires and bare powerlines. Where metallic tools or equipment can come in contact with trolley wires or bare powerlines, the lines shall be...

  1. 30 CFR 77.515 - Bare signal or control wires; voltage.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Bare signal or control wires; voltage. 77.515... COAL MINES Electrical Equipment-General § 77.515 Bare signal or control wires; voltage. The voltage on bare signal or control wires accessible to personal contact shall not exceed 40 volts....

  2. 30 CFR 57.12066 - Guarding trolley wires and bare powerlines.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Guarding trolley wires and bare powerlines. 57... MINES Electricity Surface Only § 57.12066 Guarding trolley wires and bare powerlines. Where metallic tools or equipment can come in contact with trolley wires or bare powerlines, the lines shall be...

  3. 30 CFR 57.12066 - Guarding trolley wires and bare powerlines.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Guarding trolley wires and bare powerlines. 57... MINES Electricity Surface Only § 57.12066 Guarding trolley wires and bare powerlines. Where metallic tools or equipment can come in contact with trolley wires or bare powerlines, the lines shall be...

  4. 49 CFR 234.271 - Insulated rail joints, bond wires, and track connections.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Insulated rail joints, bond wires, and track... STATE ACTION PLANS Maintenance, Inspection, and Testing Inspections and Tests § 234.271 Insulated rail joints, bond wires, and track connections. Insulated rail joints, bond wires, and track connections...

  5. 46 CFR 169.672 - Wiring for power and lighting circuits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Wiring for power and lighting circuits. 169.672 Section... Volts on Vessels of Less Than 100 Gross Tons § 169.672 Wiring for power and lighting circuits. (a) Wiring for power and lighting circuits must have copper conductors, of 14 AWG or larger, and— (1)...

  6. 46 CFR 169.679 - Wiring for power and lighting circuits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Wiring for power and lighting circuits. 169.679 Section... More on Vessels of Less Than 100 Gross Tons § 169.679 Wiring for power and lighting circuits. Wiring for each power and lighting circuit must meet subpart 111.60 of this chapter....

  7. 46 CFR 169.679 - Wiring for power and lighting circuits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Wiring for power and lighting circuits. 169.679 Section... More on Vessels of Less Than 100 Gross Tons § 169.679 Wiring for power and lighting circuits. Wiring for each power and lighting circuit must meet subpart 111.60 of this chapter....

  8. 46 CFR 169.672 - Wiring for power and lighting circuits.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Wiring for power and lighting circuits. 169.672 Section... Volts on Vessels of Less Than 100 Gross Tons § 169.672 Wiring for power and lighting circuits. (a) Wiring for power and lighting circuits must have copper conductors, of 14 AWG or larger, and— (1)...

  9. 46 CFR 169.672 - Wiring for power and lighting circuits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Wiring for power and lighting circuits. 169.672 Section... Volts on Vessels of Less Than 100 Gross Tons § 169.672 Wiring for power and lighting circuits. (a) Wiring for power and lighting circuits must have copper conductors, of 14 AWG or larger, and— (1)...

  10. 46 CFR 169.679 - Wiring for power and lighting circuits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Wiring for power and lighting circuits. 169.679 Section... More on Vessels of Less Than 100 Gross Tons § 169.679 Wiring for power and lighting circuits. Wiring for each power and lighting circuit must meet subpart 111.60 of this chapter....

  11. 46 CFR 169.679 - Wiring for power and lighting circuits.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Wiring for power and lighting circuits. 169.679 Section... More on Vessels of Less Than 100 Gross Tons § 169.679 Wiring for power and lighting circuits. Wiring for each power and lighting circuit must meet subpart 111.60 of this chapter....

  12. 46 CFR 169.672 - Wiring for power and lighting circuits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Wiring for power and lighting circuits. 169.672 Section... Volts on Vessels of Less Than 100 Gross Tons § 169.672 Wiring for power and lighting circuits. (a) Wiring for power and lighting circuits must have copper conductors, of 14 AWG or larger, and— (1)...

  13. Orbiter Kapton wire operational requirements and experience

    NASA Technical Reports Server (NTRS)

    Peterson, R. V.

    1994-01-01

    The agenda of this presentation includes the Orbiter wire selection requirements, the Orbiter wire usage, fabrication and test requirements, typical wiring installations, Kapton wire experience, NASA Kapton wire testing, summary, and backup data.

  14. False Position, Double False Position and Cramer's Rule

    ERIC Educational Resources Information Center

    Boman, Eugene

    2009-01-01

    We state and prove the methods of False Position (Regula Falsa) and Double False Position (Regula Duorum Falsorum). The history of both is traced from ancient Egypt and China through the work of Fibonacci, ending with a connection between Double False Position and Cramer's Rule.

  15. Dual wire weld feed proportioner

    NASA Technical Reports Server (NTRS)

    Nugent, R. E.

    1968-01-01

    Dual feed mechanism enables proportioning of two different weld feed wires during automated TIG welding to produce a weld alloy deposit of the desired composition. The wires are fed into the weld simultaneously. The relative feed rates of the wires and the wire diameters determine the weld deposit composition.

  16. False memories for aggressive acts.

    PubMed

    Laney, Cara; Takarangi, Melanie K T

    2013-06-01

    Can people develop false memories for committing aggressive acts? How does this process compare to developing false memories for victimhood? In the current research we used a simple false feedback procedure to implant false memories for committing aggressive acts (causing a black eye or spreading malicious gossip) or for victimhood (receiving a black eye). We then compared these false memories to other subjects' true memories for equivalent events. False aggressive memories were all too easy to implant, particularly in the minds of individuals with a proclivity towards aggression. Once implanted, the false memories were indistinguishable from true memories for the same events, on several dimensions, including emotional content. Implications for aggression-related memory more generally as well as false confessions are discussed. PMID:23639921

  17. Splicing Wires Permanently With Explosives

    NASA Technical Reports Server (NTRS)

    Bement, Laurence J.; Kushnick, Anne C.

    1990-01-01

    Explosive joining process developed to splice wires by enclosing and metallurgically bonding wires within copper sheets. Joints exhibit many desirable characteristics, 100-percent conductivity and strength, no heat-induced annealing, no susceptibility to corrosion in contacts between dissimilar metals, and stability at high temperature. Used to join wires to terminals, as well as to splice wires. Applicable to telecommunications industry, in which millions of small wires spliced annually.

  18. Wire brush fastening device

    SciTech Connect

    Meigs, R.A.

    1993-08-31

    A fastening device is provided which is a variation on the conventional nut and bolt. The bolt has a longitudinal axis and threading helically affixed thereon along the longitudinal axis. A nut having a bore extending therethrough is provided. The bore of the nut has a greater diameter than the diameter of the bolt so the bolt can extend through the bore. An array of wire bristles are affixed within the bore so as to form a brush. The wire bristles extend inwardly from the bore and are constructed and arranged of the correct size, length and stiffness to guide the bolt within the bore and to restrain the bolt within the bore as required. A variety of applications of the wire brush nut are disclosed, including a bolt capture device and a test rig apparatus.

  19. Wire brush fastening device

    DOEpatents

    Meigs, Richard A.

    1995-01-01

    A fastening device is provided which is a variation on the conventional nut and bolt. The bolt has a longitudinal axis and threading helically affixed thereon along the longitudinal axis. A nut having a bore extending therethrough is provided. The bore of the nut has a greater diameter than the diameter of the bolt so the bolt can extend through the bore. An array of wire bristles are affixed within the bore so as to form a brush. The wire bristles extend inwardly from the bore and are constructed and arranged of the correct size, length and stiffness to guide the bolt within the bore and to restrain the bolt within the bore as required. A variety of applications of the wire brush nut are disclosed, including a bolt capture device and a test rig apparatus.

  20. Wire brush fastening device

    DOEpatents

    Meigs, R.A.

    1995-09-19

    A fastening device is provided which is a variation on the conventional nut and bolt. The bolt has a longitudinal axis and threading helically affixed thereon along the longitudinal axis. A nut having a bore extending therethrough is provided. The bore of the nut has a greater diameter than the diameter of the bolt so the bolt can extend through the bore. An array of wire bristles are affixed within the bore so as to form a brush. The wire bristles extend inwardly from the bore and are constructed and arranged of the correct size, length and stiffness to guide the bolt within the bore and to restrain the bolt within the bore as required. A variety of applications of the wire brush nut are disclosed, including a bolt capture device and a test rig apparatus. 13 figs.

  1. Dielectric coated wire antennas

    NASA Technical Reports Server (NTRS)

    Richmond, J. H.; Newman, E. H.

    1976-01-01

    An electrically thin dielectric insulating shell on an antenna composed of electrically thin circular cylindrical wires is examined. A moment method solution is obtained, and the insulating shell is modeled by equivalent volume polarization currents. These polarization currents are related in a simple manner to the surface charge density on the wire antenna. In this way the insulating shell causes no new unknowns to be introduced, and the size of the impedance matrix is the same as for the uninsulated wires. The insulation is accounted for entirely through a modification of the symmetric impedance matrix. This modification influences the current distribution, impedance, efficiency, field patterns, and scattering properties. The theory is compared with measurement for dielectric coated antennas in air.

  2. 2. TYPICAL OVERHEAD WIRE CONSTRUCTION CURVE GUY WIRE ARRANGEMENT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. TYPICAL OVERHEAD WIRE CONSTRUCTION - CURVE GUY WIRE ARRANGEMENT (ABANDONED WEST LEG OF WYE AT SIXTH AVENUE AND PINE STREET) - Yakima Valley Transportation Company Interurban Railroad, Trackage, Yakima, Yakima County, WA

  3. Reduced False Memory after Sleep

    ERIC Educational Resources Information Center

    Fenn, Kimberly M.; Gallo, David A.; Margoliash, Daniel; Roediger, Henry L., III; Nusbaum, Howard C.

    2009-01-01

    Several studies have shown that sleep contributes to the successful maintenance of previously encoded information. This research has focused exclusively on memory for studied events, as opposed to false memories. Here we report three experiments showing that sleep reduces false memories in the Deese-Roediger-McDermott (DRM) memory illusion. False…

  4. Flying wires at Fermilab

    SciTech Connect

    Gannon, J.; Crawford, C.; Finley, D.; Flora, R.; Groves, T.; MacPherson, M.

    1989-03-01

    Transverse beam profile measurement systems called ''Flying Wires'' have been installed and made operational in the Fermilab Main Ring and Tevatron accelerators. These devices are used routinely to measure the emittance of both protons and antiprotons throughout the fill process, and for emittance growth measurements during stores. In the Tevatron, the individual transverse profiles of six proton and six antiproton bunches are obtained simultaneously, with a single pass of the wire through the beam. Essential features of the hardware, software, and system operation are explained in the rest of the paper. 3 refs., 4 figs.

  5. Wiring for space applications program

    NASA Technical Reports Server (NTRS)

    Hammoud, Ahmad

    1994-01-01

    The insulation testing and analysis consists of: identifying and prioritizing NASA wiring requirements; selecting candidate wiring constructions; developing test matrix and formulating test program; managing, coordinating, and conducting tests; and analyzing and documenting data, establishing guidelines and recommendations.

  6. Executive Functioning and Preschoolers' Understanding of False Beliefs, False Photographs, and False Signs

    ERIC Educational Resources Information Center

    Sabbagh, Mark A.; Moses, Louis J.; Shiverick, Sean

    2006-01-01

    Two studies were conducted to investigate the specificity of the relationship between preschoolers' emerging executive functioning skills and false belief understanding. Study 1 (N=44) showed that 3- to 5-year-olds' performance on an executive functioning task that required selective suppression of actions predicted performance on false belief…

  7. NewsWire, 2002.

    ERIC Educational Resources Information Center

    Byrom, Elizabeth, Ed.; Bingham, Margaret, Ed.; Bowman, Gloria, Ed.; Shoemaker, Dan, Ed.

    2002-01-01

    This document presents the 3 2002 issues of the newsletter "NewsWire," (volume 5). Issue Number One focuses on collaborative Web projects. This issue begins with descriptions of four individual projects: "iEARN"; "Operation RubyThroat"; "Follow the Polar Huskies!"; and "Log in Your Animal Roadkill!" Features that follow include: "Bringing the…

  8. Basic Wiring. Second Edition.

    ERIC Educational Resources Information Center

    Kaltwasser, Stan; And Others

    This guide is designed to assist teachers conducting a foundation course to prepare students for additional courses of training for entry-level employment in either the residential or commercial and industrial wiring trades. Included in the guide are 17 instructional units and the following sections of information for teachers: guidelines in using…

  9. Improved wire chamber

    DOEpatents

    Atac, M.

    1987-05-12

    An improved gas mixture for use with proportional counter devices, such as Geiger-Mueller tubes and drift chambers. The improved gas mixture provides a stable drift velocity while eliminating wire aging caused by prior art gas mixtures. The new gas mixture is comprised of equal parts argon and ethane gas and having approximately 0.25% isopropyl alcohol vapor. 2 figs.

  10. Caroviologens: Towards molecular wires

    NASA Astrophysics Data System (ADS)

    Blanchard-Desce, M.; Arrhenius, T. S.; Dvolaïtzky, M.; Kugimiya, S.-I.; Lazrak, T.; Lehn, J.-M.

    1992-07-01

    Bispyridinium conjugated polyenes of different lengths and charges have been synthesized. Since they combine the features of carotenoids and of viologens, they have been termed caroviologens. Such molecules, possessing an extended conjugated chain fitted with polar electroactive endgroups, and having a length sufficient to span a lipid membrane could function as transmembrane electron channels, i.e., as molecular wires.

  11. A World without Wires

    ERIC Educational Resources Information Center

    Panettieri, Joseph C.

    2006-01-01

    The wireless bandwagon is rolling across Mississippi, picking up a fresh load of converts and turning calamity into opportunity. Traditional wired school networks, many of which unraveled during Hurricane Katrina, are giving way to advanced wireless mesh networks that frequently include voice-over-IP (VoIP) capabilities. Vendor funding is helping…

  12. Residential Wiring. Second Edition.

    ERIC Educational Resources Information Center

    Taylor, Mark; And Others

    This guide is designed to assist teachers conducting a course to prepare students for entry-level employment in the residential wiring trade. Included in the guide are six instructional units and the following sections of information for teachers: guidelines in using the unit components; academic and workplace skills classifications and…

  13. Easily-wired toggle switch

    NASA Technical Reports Server (NTRS)

    Dean, W. T.; Stringer, E. J.

    1979-01-01

    Crimp-type connectors reduce assembly and disassembly time. With design, no switch preparation is necessary and socket contracts are crimped to wires inserted in module attached to back of toggle switch engaging pins inside module to make electrical connections. Wires are easily removed with standard detachment tool. Design can accommodate wires of any gage and as many terminals can be placed on switch as wire gage and switch dimensions will allow.

  14. Wire EDM for Refractory Materials

    NASA Technical Reports Server (NTRS)

    Zellars, G. R.; Harris, F. E.; Lowell, C. E.; Pollman, W. M.; Rys, V. J.; Wills, R. J.

    1982-01-01

    In an attempt to reduce fabrication time and costs, Wire Electrical Discharge Machine (Wire EDM) method was investigated as tool for fabricating matched blade roots and disk slots. Eight high-strength nickel-base superalloys were used. Computer-controlled Wire EDM technique provided high quality surfaces with excellent dimensional tolerances. Wire EDM method offers potential for substantial reductions in fabrication costs for "hard to machine" alloys and electrically conductive materials in specific high-precision applications.

  15. Tunneling decay of false kinks

    NASA Astrophysics Data System (ADS)

    Dupuis, Éric; Gobeil, Yan; MacKenzie, Richard; Marleau, Luc; Paranjape, M. B.; Ung, Yvan

    2015-07-01

    We consider the decay of "false kinks," that is, kinks formed in a scalar field theory with a pair of degenerate symmetry-breaking false vacua in 1 +1 dimensions. The true vacuum is symmetric. A second scalar field and a peculiar potential are added in order for the kink to be classically stable. We find an expression for the decay rate of a false kink. As with any tunneling event, the rate is proportional to exp (-SE) where SE is the Euclidean action of the bounce describing the tunneling event. This factor varies wildly depending on the parameters of the model. Of interest is the fact that for certain parameters SE can get arbitrarily small, implying that the kink is only barely stable. Thus, while the false vacuum itself may be very long-lived, the presence of kinks can give rise to rapid vacuum decay.

  16. False allegation of child abduction.

    PubMed

    Canning, Kathleen E; Hilts, Mark A; Muirhead, Yvonne E

    2011-05-01

    Cases in which a child has been falsely reported as missing or abducted can be extremely challenging to the law enforcement agencies responsible for their investigation. In the absence of a witnessed abduction or an obvious crime scene, it is difficult to determine whether a child has actually been abducted or has become a victim of a homicide and a false allegation. The purpose of this study was to examine falsely alleged kidnapping cases and identify successful investigative strategies. Sixty-one adjudicated false allegation cases involving 66 victims were analyzed. The mean age of the victim was 5 years. Victims came from generally unstable, high-risk family situations and were killed primarily by biological parents. Victims were killed because they were unwanted or viewed as an obstacle to a desired goal, or they were victims of abuse or maltreatment that ended in fatality. PMID:21361941

  17. Sleep deprivation and false confessions.

    PubMed

    Frenda, Steven J; Berkowitz, Shari R; Loftus, Elizabeth F; Fenn, Kimberly M

    2016-02-23

    False confession is a major contributor to the problem of wrongful convictions in the United States. Here, we provide direct evidence linking sleep deprivation and false confessions. In a procedure adapted from Kassin and Kiechel [(1996) Psychol Sci 7(3):125-128], participants completed computer tasks across multiple sessions and repeatedly received warnings that pressing the "Escape" key on their keyboard would cause the loss of study data. In their final session, participants either slept all night in laboratory bedrooms or remained awake all night. In the morning, all participants were asked to sign a statement, which summarized their activities in the laboratory and falsely alleged that they pressed the Escape key during an earlier session. After a single request, the odds of signing were 4.5 times higher for the sleep-deprived participants than for the rested participants. These findings have important implications and highlight the need for further research on factors affecting true and false confessions. PMID:26858426

  18. VESPA: False positive probabilities calculator

    NASA Astrophysics Data System (ADS)

    Morton, Timothy D.

    2015-03-01

    Validation of Exoplanet Signals using a Probabilistic Algorithm (VESPA) calculates false positive probabilities and statistically validates transiting exoplanets. Written in Python, it uses isochrones [ascl:1503.010] and the package simpledist.

  19. Nonlinear dynamics of false bottoms

    NASA Astrophysics Data System (ADS)

    Nizovtseva, Irina; Alexandrov, Dmitri; Ryashko, Lev

    2014-05-01

    Nansen from his observations in the Beaufort Sea published in 1897 noted that heat transfer from the fresh water to the arctic salt water is the only source of ice accretion during the polar summer. This transfer mechanism, unusual at first sight, is responsible for the initiation and evolution of a false bottom ice, changing ice properties to a great extent and affecting various processes while interacting with the ocean and the atmosphere. A false bottom represents a thin layer of ice which forms in summer underneath the floe where fresh water lies between the salt water and the ice. Details of how this process occurs in nature are now emerging from different laboratory and field experiments. The false bottoms appearing at the interface between the fresh and salt water as a result of double-diffusive convection normally lie below surface and under-ice melt ponds. Such false bottoms represent the only significant source of ice growth in the Arctic during the spring-summer period. Their evolution influences the mass balance of the Arctic sea-ice cover recognized as an indicator of climate change. However, the quantity, aerial extent and other properties of false bottoms are difficult to measure because coring under the surface melt ponds leads to direct mixing of surface and under-ice water. This explains why their aerial extent and overall volume is still not known despite the fact that the upper limit of the ice coverage by the false bottom is approximately half of the ice surface. The growth of false bottoms also leads to other important consequences for different physical, chemical and biological processes associated with their dynamics. This study addressed to a broad community of readers is concerned with non-linear behavior of false bottoms including their stochastic dynamics due to possible fluctuations of the main process parameters in the ocean and the atmosphere.

  20. 1997 wire development workshop: Proceedings

    SciTech Connect

    1997-04-01

    This conference is divided into the following sections: (1) First Generation Wires I; (2) First Generation Wires II; (3) Coated conductors I; and (4) Coated conductors II. Applications of the superconducting wires include fault current limiters, superconducting motors, transformers, and power transmission lines.

  1. Production of hot-wires

    NASA Astrophysics Data System (ADS)

    Dickinson, S. C.

    1983-04-01

    Several methods for producing hot-wire probes are described. Discussion includes the manufacture of probe bodies, soldering plated wires to the prongs etching Walaston type wires, and finishing the probe. This report is written as an instruction manual for researchers who desire to produce or repair their own sensors.

  2. Silver-sheathed multifilament wires

    NASA Astrophysics Data System (ADS)

    Wu, C. T.; Goretta, K. C.; Shi, D.; Lanagan, M. T.; Poeppel, R. B.

    1991-01-01

    The process for manufacturing Ag-sheathed multifilament superconducting wires was investigated. Bi2Sr(1.7)CaCu2O(x), Pb-doped Bi2Sr2Ca2Cu3O(x), or YBa2Cu3O(x) powders were packed into Ag tubes and swaged into long wires. Pieces were cut from each wire, packed into a second Ag tube and swaged or rolled into multifilament wires. Each wire was then sintered to produce a superconductor. Processing considerations included the sheath workability, effects of compacting and residual stresses, and heat treatment schedules. The superconducting properties of the Bi-based wires were superior to those of the YBa2Cu3O(x) wires at 4.2 K, but not at 77 K.

  3. Sleep Loss Produces False Memories

    PubMed Central

    Diekelmann, Susanne; Landolt, Hans-Peter; Lahl, Olaf; Born, Jan; Wagner, Ullrich

    2008-01-01

    People sometimes claim with high confidence to remember events that in fact never happened, typically due to strong semantic associations with actually encoded events. Sleep is known to provide optimal neurobiological conditions for consolidation of memories for long-term storage, whereas sleep deprivation acutely impairs retrieval of stored memories. Here, focusing on the role of sleep-related memory processes, we tested whether false memories can be created (a) as enduring memory representations due to a consolidation-associated reorganization of new memory representations during post-learning sleep and/or (b) as an acute retrieval-related phenomenon induced by sleep deprivation at memory testing. According to the Deese, Roediger, McDermott (DRM) false memory paradigm, subjects learned lists of semantically associated words (e.g., “night”, “dark”, “coal”,…), lacking the strongest common associate or theme word (here: “black”). Subjects either slept or stayed awake immediately after learning, and they were either sleep deprived or not at recognition testing 9, 33, or 44 hours after learning. Sleep deprivation at retrieval, but not sleep following learning, critically enhanced false memories of theme words. This effect was abolished by caffeine administration prior to retrieval, indicating that adenosinergic mechanisms can contribute to the generation of false memories associated with sleep loss. PMID:18946511

  4. Sleep deprivation and false confessions

    PubMed Central

    Frenda, Steven J.; Berkowitz, Shari R.; Loftus, Elizabeth F.; Fenn, Kimberly M.

    2016-01-01

    False confession is a major contributor to the problem of wrongful convictions in the United States. Here, we provide direct evidence linking sleep deprivation and false confessions. In a procedure adapted from Kassin and Kiechel [(1996) Psychol Sci 7(3):125–128], participants completed computer tasks across multiple sessions and repeatedly received warnings that pressing the “Escape” key on their keyboard would cause the loss of study data. In their final session, participants either slept all night in laboratory bedrooms or remained awake all night. In the morning, all participants were asked to sign a statement, which summarized their activities in the laboratory and falsely alleged that they pressed the Escape key during an earlier session. After a single request, the odds of signing were 4.5 times higher for the sleep-deprived participants than for the rested participants. These findings have important implications and highlight the need for further research on factors affecting true and false confessions. PMID:26858426

  5. Tunneling decay of false vortices

    NASA Astrophysics Data System (ADS)

    Lee, Bum-Hoon; Lee, Wonwoo; MacKenzie, Richard; Paranjape, M. B.; Yajnik, U. A.; Yeom, Dong-han

    2013-10-01

    We consider the decay of vortices trapped in the false vacuum of a theory of scalar electrodynamics in 2+1 dimensions. The potential is inspired by models with intermediate symmetry breaking to a metastable vacuum that completely breaks a U(1) symmetry, while in the true vacuum, the symmetry is unbroken. The false vacuum is unstable through the formation of true vacuum bubbles; however, the rate of decay can be extremely long. On the other hand, the false vacuum can contain metastable vortex solutions. These vortices contain the true vacuum inside in addition to a unit of magnetic flux and the appropriate topologically nontrivial false vacuum outside. We numerically establish the existence of vortex solutions which are classically stable; however, they can decay via tunneling. In general terms, they tunnel to a configuration which is a large, thin-walled vortex configuration that is now classically unstable to the expansion of its radius. We compute an estimate for the tunneling amplitude in the semiclassical approximation. We believe our analysis would be relevant to superconducting thin films or superfluids.

  6. Evolutionary Psychology and False Confession

    ERIC Educational Resources Information Center

    Bering, Jesse M.; Shackelford, Todd K.

    2005-01-01

    This paper presents comments on Kassin's review, (see record 2005-03019-002) of the psychology of false confessions. The authors note that Kassin's review makes a compelling argument for the need for legal reform in police interrogation practices. Because his work strikes at the heart of the American criminal justice system--its fairness--the…

  7. Multiple True-False Questions

    ERIC Educational Resources Information Center

    Hill, G. C.; Woods, G. T.

    1974-01-01

    Two types of objective questions are compared: the multiple choice item, in which one and only one of several stated alternatives is correct for a given initial statement, and the multiple true-false item, where the stem is followed by several completions of which one or more can be correct. (DT)

  8. MSPI False Indication Probability Simulations

    SciTech Connect

    Dana Kelly; Kurt Vedros; Robert Youngblood

    2011-03-01

    This paper examines false indication probabilities in the context of the Mitigating System Performance Index (MSPI), in order to investigate the pros and cons of different approaches to resolving two coupled issues: (1) sensitivity to the prior distribution used in calculating the Bayesian-corrected unreliability contribution to the MSPI, and (2) whether (in a particular plant configuration) to model the fuel oil transfer pump (FOTP) as a separate component, or integrally to its emergency diesel generator (EDG). False indication probabilities were calculated for the following situations: (1) all component reliability parameters at their baseline values, so that the true indication is green, meaning that an indication of white or above would be false positive; (2) one or more components degraded to the extent that the true indication would be (mid) white, and “false” would be green (negative) or yellow (negative) or red (negative). In key respects, this was the approach taken in NUREG-1753. The prior distributions examined were the constrained noninformative (CNI) prior used currently by the MSPI, a mixture of conjugate priors, the Jeffreys noninformative prior, a nonconjugate log(istic)-normal prior, and the minimally informative prior investigated in (Kelly et al., 2010). The mid-white performance state was set at ?CDF = ?10 ? 10-6/yr. For each simulated time history, a check is made of whether the calculated ?CDF is above or below 10-6/yr. If the parameters were at their baseline values, and ?CDF > 10-6/yr, this is counted as a false positive. Conversely, if one or all of the parameters are set to values corresponding to ?CDF > 10-6/yr but that time history’s ?CDF < 10-6/yr, this is counted as a false negative indication. The false indication (positive or negative) probability is then estimated as the number of false positive or negative counts divided by the number of time histories (100,000). Results are presented for a set of base case parameter values

  9. From wires to cosmology

    NASA Astrophysics Data System (ADS)

    Amin, Mustafa A.; Baumann, Daniel

    2016-02-01

    We provide a statistical framework for characterizing stochastic particle production in the early universe via a precise correspondence to current conduction in wires with impurities. Our approach is particularly useful when the microphysics is uncertain and the dynamics are complex, but only coarse-grained information is of interest. We study scenarios with multiple interacting fields and derive the evolution of the particle occupation numbers from a Fokker-Planck equation. At late times, the typical occupation numbers grow exponentially which is the analog of Anderson localization for disordered wires. Some statistical features of the occupation numbers show hints of universality in the limit of a large number of interactions and/or a large number of fields. For test cases, excellent agreement is found between our analytic results and numerical simulations.

  10. Dental Arch Wire

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Straightening teeth is an arduous process requiring months, often years, of applying corrective pressure by means of arch wires-better known as brace-which may have to be changed several times in the course of treatment. A new method has been developed by Dr. George Andreasen, orthodontist and dental scientist at the University of Iowa. The key is a new type of arch wire material, called Nitinol, with exceptional elasticity which helps reduce the required number of brace changes. An alloy of nickel and titanium, Nitinol was originally developed for aerospace applications by the Naval Ordnance Laboratory, now the Naval Surface Weapons Laboratory, White Oaks, Maryland. NASA subsequently conducted additional research on the properties of Nitinol and on procedures for processing the metal.

  11. Wire insulation defect detector

    NASA Technical Reports Server (NTRS)

    Greulich, Owen R. (Inventor)

    2004-01-01

    Wiring defects are located by detecting a reflected signal that is developed when an arc occurs through the defect to a nearby ground. The time between the generation of the signal and the return of the reflected signal provides an indication of the distance of the arc (and therefore the defect) from the signal source. To ensure arcing, a signal is repeated at gradually increasing voltages while the wire being tested and a nearby ground are immersed in a conductive medium. In order to ensure that the arcing occurs at an identifiable time, the signal whose reflection is to be detected is always made to reach the highest potential yet seen by the system.

  12. Wiring for aerospace applications

    NASA Technical Reports Server (NTRS)

    Christian, J. L., Jr.; Dickman, J. E.; Bercaw, R. W.; Myers, I. T.; Hammoud, A. N.; Stavnes, M.; Evans, J.

    1992-01-01

    In this paper, the authors summarize the current state of knowledge of arc propagation in aerospace power wiring and efforts by the National Aeronautics and Space Administration (NASA) towards the understanding of the arc tracking phenomena in space environments. Recommendations will be made for additional testing. A database of the performance of commonly used insulating materials will be developed to support the design of advanced high power missions, such as Space Station Freedom and Lunar/Mars Exploration.

  13. Plated wire memory subsystem

    NASA Technical Reports Server (NTRS)

    Reynolds, L.; Tweed, H.

    1972-01-01

    The work performed entailed the design, development, construction and testing of a 4000 word by 18 bit random access, NDRO plated wire memory for use in conjunction with a spacecraft imput/output unit and central processing unit. The primary design parameters, in order of importance, were high reliability, low power, volume and weight. A single memory unit, referred to as a qualification model, was delivered.

  14. Outcome Knowledge and False Belief

    PubMed Central

    Ghrear, Siba E.; Birch, Susan A. J.; Bernstein, Daniel M.

    2016-01-01

    Virtually every social interaction involves reasoning about the perspectives of others, or ‘theory of mind (ToM).’ Previous research suggests that it is difficult to ignore our current knowledge when reasoning about a more naïve perspective (i.e., the curse of knowledge). In this Mini Review, we discuss the implications of the curse of knowledge for certain aspects of ToM. Particularly, we examine how the curse of knowledge influences key measurements of false belief reasoning. In closing, we touch on the need to develop new measurement tools to discern the mechanisms involved in the curse of knowledge and false belief reasoning, and how they develop across the lifespan. PMID:26903922

  15. Partial 'Seminole' Panorama (False Color)

    NASA Technical Reports Server (NTRS)

    2005-01-01

    This view from Spirit's panoramic camera is assembled from frames acquired on Martian days, or sols, 672 and 673 (Nov. 23 and 24, 2005) from the rover's position near an outcrop called 'Seminole.' The view is a southward-looking portion of a larger panorama still being completed. This is a false-color version to emphasize geological differences. It is a composite of images shot through three different filters, admitting light of wavelengths 750 nanometers, 530 nanometers and 430 nanometers.

  16. Dual wire welding torch and method

    DOEpatents

    Diez, Fernando Martinez; Stump, Kevin S.; Ludewig, Howard W.; Kilty, Alan L.; Robinson, Matthew M.; Egland, Keith M.

    2009-04-28

    A welding torch includes a nozzle with a first welding wire guide configured to orient a first welding wire in a first welding wire orientation, and a second welding wire guide configured to orient a second welding wire in a second welding wire orientation that is non-coplanar and divergent with respect to the first welding wire orientation. A method of welding includes moving a welding torch with respect to a workpiece joint to be welded. During moving the welding torch, a first welding wire is fed through a first welding wire guide defining a first welding wire orientation and a second welding wire is fed through a second welding wire guide defining a second welding wire orientation that is divergent and non-coplanar with respect to the first welding wire orientation.

  17. Wire detecting apparatus and method

    SciTech Connect

    Kronberg, J.W.

    1991-12-31

    This invention is comprised of an apparatus and method that combines a signal generator and a passive signal receiver to detect and record the path of partially or completely concealed electrical wiring without disturbing the concealing surface. The signal generator applies a series of electrical pulses to the selected wiring of interest. The applied pulses create a magnetic field about the wiring that can be detected by a coil contained within the signal receiver. An audible output connected to the receiver and driven by the coil reflects the receiver`s position with respect to the wiring. The receiver`s audible signal is strongest when the receiver is directly above the wiring and the long axis of the receiver`s coil is parallel to the wiring. A marking means is mounted on the receiver to mark the location of the wiring as the receiver is directed over the wiring`s concealing surface. Numerous marks made on various locations of the concealing surface will trace the path of the wiring of interest.

  18. Manually Operated Welding Wire Feeder

    NASA Technical Reports Server (NTRS)

    Rybicki, Daniel J. (Inventor)

    2001-01-01

    A manual welding wire feeder apparatus comprising a bendable elongate metal frame with a feed roller mounted at the center thereof for rotation about an axis transverse to the longitudinal axis of the frame. The frame ends are turned up as tabs and each provided with openings in alignment with each other and the mid-width center of the roller surface. The tab openings are sized to accommodate welding wire and each extends to a side edge of the tab, both opening on the same side of the frame, whereby welding wire can be side-loaded onto the frame. On the side of the frame, opposite the roller a lock ring handle is attached tangentially and is rotatable about the attachment point and an axis perpendicular to the frame. The device is grasped in the hand normally used to hold the wire. A finger is placed through the loop ring and the frame positioned across the palm and lower fingers. The thumb is positioned atop the wire so it can be moved from the back of the frame across the roller, and towards the front. In doing so, the wire is advanced at a steady rate in axial alignment with the tab openings and roller. To accommodate different wire diameters the frame is bendable about its center in the plane of the frame axis and wire so as to keep the wire in sufficient tension against the roller and to keep the wire fixed when the frame is tilted and thumb pressure released.

  19. Metering Wheel-Wire Track Wire Boom Deployment Mechanism

    NASA Technical Reports Server (NTRS)

    Granoff, Mark S.

    2014-01-01

    The NASA MMS Spin Plane Double Probe (SDP) Deployer utilizes a helical path, rotating Metering Wheel and a spring loaded Wire "Holding" Track to pay out a "fixed end" 57 meter x 1.5 mm diameter Wire Boom stored between concentric storage cylinders. Unlike rotating spool type storage devices, the storage cylinders remain stationary, and the boom wire is uncoiled along the length of the cylinder via the rotation of the Metering Wheel. This uncoiling action avoids the need for slip-ring contacts since the ends of the wire can remain stationary. Conventional fixed electrical connectors (Micro-D type) are used to terminate to operational electronics.

  20. False advertising in the greenhouse?

    NASA Astrophysics Data System (ADS)

    Banse, K.

    1991-12-01

    Most scientists are convinced of the importance of their own research subjects. Broecker [1991] has deplored the temptation, if not the tendency, to go overboard and exaggerate this importance once funding enters the mind. In particular, he alleges inflated or even false claims by biological (and other) oceanographers regarding the relevance of their research to the "greenhouse effect," caused by the anthropogenic enhancement of the atmospheric CO2 content. He writes [Broecker, 1991, p. 191]: "In my estimation, on any list of subjects requiring intense study with regard to the prediction of the consequences of CO2 buildup in the atmosphere, I would place marine biological cycles near the bottom."

  1. Review of wire chamber aging

    SciTech Connect

    Va'Vra, J.

    1986-02-01

    This paper makes an overview of the wire chamber aging problems as a function of various chamber design parameters. It emphasizes the chemistry point of view and many examples are drawn from the plasma chemistry field as a guidance for a possible effort in the wire chamber field. The paper emphasizes the necessity of variable tuning, the importance of purity of the wire chamber environment, as well as it provides a practical list of presently known recommendations. In addition, several models of the wire chamber aging are qualitatively discussed. The paper is based on a summary talk given at the Wire Chamber Aging Workshop held at LBL, Berkeley on January 16-17, 1986. Presented also at Wire Chamber Conference, Vienna, February 25-28, 1986. 74 refs., 18 figs., 11 tabs.

  2. 'Payson' Panorama in False Color

    NASA Technical Reports Server (NTRS)

    2006-01-01

    The panoramic camera aboard NASA's Mars Exploration Rover Opportunity acquired this panorama of the 'Payson' outcrop on the western edge of 'Erebus' Crater during Opportunity's sol 744 (Feb. 26, 2006). From this vicinity at the northern end of the outcrop, layered rocks are observed in the crater wall, which is about 1 meter (3.3 feet) thick. The view also shows rocks disrupted by the crater-forming impact event and subjected to erosion over time.

    To the left of the outcrop, a flat, thin layer of spherule-rich soils overlies more outcrop materials. The rover is currently traveling down this 'road' and observing the approximately 25-meter (82-foot) length of the outcrop prior to departing Erebus crater.

    The panorama camera took 28 separate exposures of this scene, using four different filters. The resulting panorama covers about 90 degrees of terrain around the rover. This false-color rendering was made using the camera's 753-nanometer, 535-nanometer and 423-nanometer filters. Using false color enhances the subtle color differences between layers of rocks and soils in the scene so that scientists can better analyze them. Image-to-image seams have been eliminated from the sky portion of the mosaic to better simulate the vista a person standing on Mars would see.

  3. Building false memories without suggestions.

    PubMed

    Foster, Jeffrey L; Garry, Maryanne

    2012-01-01

    People can come to remember doing things they have never done. The question we asked in this study is whether people can systematically come to remember performing actions they never really did, in the absence of any suggestion from the experimenter. People built LEGO vehicles, performing some steps but not others. For half the people, all the pieces needed to assemble each vehicle were laid out in order in front of them while they did the building; for the other half, the pieces were hidden from view. The next day, everyone returned for a surprise recognition test. People falsely and confidently remembered having carried out steps they did not; those who saw all the pieces while they built each vehicle were more likely to correctly remember performing steps they did perform but equally likely to falsely remember performing steps they did not. We explain our results using the source monitoring framework: People used the relationships between actions to internally generate the missing, related actions, later mistaking that information for genuine experience. PMID:22774684

  4. Neural wiring optimization.

    PubMed

    Cherniak, Christopher

    2012-01-01

    Combinatorial network optimization theory concerns minimization of connection costs among interconnected components in systems such as electronic circuits. As an organization principle, similar wiring minimization can be observed at various levels of nervous systems, invertebrate and vertebrate, including primate, from placement of the entire brain in the body down to the subcellular level of neuron arbor geometry. In some cases, the minimization appears either perfect, or as good as can be detected with current methods. One question such best-of-all-possible-brains results raise is, what is the map of such optimization, does it have a distinct neural domain? PMID:22230636

  5. Plated wire memory subsystem

    NASA Technical Reports Server (NTRS)

    Carpenter, K. H.

    1974-01-01

    The design, construction, and test history of a 4096 word by 18 bit random access NDRO Plated Wire Memory for use in conjunction with a spacecraft input/output and central processing unit is reported. A technical and functional description is given along with diagrams illustrating layout and systems operation. Test data is shown on the procedures and results of system level and memory stack testing, and hybrid circuit screening. A comparison of the most significant physical and performance characteristics of the memory unit versus the specified requirements is also included.

  6. Texture development in Galfenol wire

    NASA Astrophysics Data System (ADS)

    Boesenberg, A. J.; Restorff, J. B.; Wun-Fogle, M.; Sailsbury, H.; Summers, E.

    2013-05-01

    Galfenol (Fe-Ga alloy) wire fabrication provides a low cost alternative to directional solidification methods. This work evaluates the compositional dependence of the wire drawing suitability of Fe-Ga and characterizes the microstructural and magnetic properties of these wires. Wire has been produced with Ga contents between 10 at. % and 17 at. % to allow determination of the ductile to brittle transition (DTBT) in wire manufacture. Published results on chill cast bend specimens indicated that a DTBT occurs at roughly 15 at. % Ga. This DTBT was observed under tensile loading with a corresponding change in fracture behavior from transverse fracture to intergranular fracture. For improved magnetostrictive performance, higher Ga contents are desired, closer to the 17 at. % Ga evaluated in this work. Electron backscattered diffraction B-H loop and resonance measurements as a function of magnetic field (to determine modulus and coupling factor) are presented for as-drawn, furnace, and direct current (DC) annealed wire. Galfenol wire produced via traditional drawing methods is found to have a strong <110> (α) texture parallel to the drawing direction. As-drawn wire was observed to have a lower magnetic permeability and larger hysteresis than DC annealed wire. This is attributed to the presence of a large volume of crystalline defects; such as vacancies and dislocations.

  7. 49 CFR 236.74 - Protection of insulated wire; splice in underground wire.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... underground wire. 236.74 Section 236.74 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RULES, STANDARDS, AND INSTRUCTIONS GOVERNING... wire; splice in underground wire. Insulated wire shall be protected from mechanical injury....

  8. 49 CFR 236.74 - Protection of insulated wire; splice in underground wire.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... underground wire. 236.74 Section 236.74 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RULES, STANDARDS, AND INSTRUCTIONS GOVERNING... wire; splice in underground wire. Insulated wire shall be protected from mechanical injury....

  9. 49 CFR 234.241 - Protection of insulated wire; splice in underground wire.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... underground wire. 234.241 Section 234.241 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION GRADE CROSSING SIGNAL SYSTEM SAFETY... of insulated wire; splice in underground wire. Insulated wire shall be protected from...

  10. 49 CFR 236.74 - Protection of insulated wire; splice in underground wire.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... underground wire. 236.74 Section 236.74 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RULES, STANDARDS, AND INSTRUCTIONS GOVERNING... wire; splice in underground wire. Insulated wire shall be protected from mechanical injury....

  11. 49 CFR 236.74 - Protection of insulated wire; splice in underground wire.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... underground wire. 236.74 Section 236.74 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RULES, STANDARDS, AND INSTRUCTIONS GOVERNING... wire; splice in underground wire. Insulated wire shall be protected from mechanical injury....

  12. 49 CFR 234.241 - Protection of insulated wire; splice in underground wire.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... underground wire. 234.241 Section 234.241 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION GRADE CROSSING SIGNAL SYSTEM SAFETY... of insulated wire; splice in underground wire. Insulated wire shall be protected from...

  13. 49 CFR 236.74 - Protection of insulated wire; splice in underground wire.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... underground wire. 236.74 Section 236.74 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RULES, STANDARDS, AND INSTRUCTIONS GOVERNING... wire; splice in underground wire. Insulated wire shall be protected from mechanical injury....

  14. Cape Verde in False Color

    NASA Technical Reports Server (NTRS)

    2007-01-01

    A promontory nicknamed 'Cape Verde' can be seen jutting out from the walls of Victoria Crater in this false-color picture taken by the panoramic camera on NASA's Mars Exploration Rover Opportunity. The rover took this picture on martian day, or sol, 1329 (Oct. 20, 2007), more than a month after it began descending down the crater walls -- and just 9 sols shy of its second Martian birthday on sol 1338 (Oct. 29, 2007). Opportunity landed on the Red Planet on Jan. 25, 2004. That's nearly four years ago on Earth, but only two on Mars because Mars takes longer to travel around the sun than Earth. One Martian year equals 687 Earth days.

    This view was taken using three panoramic-camera filters, admitting light with wavelengths centered at 750 nanometers (near infrared), 530 nanometers (green) and 430 nanometers (violet).

  15. Two-Wire to Four-Wire Audio Converter

    NASA Technical Reports Server (NTRS)

    Talley, G. L., Jr; Seale, B. L.

    1983-01-01

    Simple circuit provides interface between normally incompatible voicecommunication lines. Circuit maintains 40 dB of isolation between input and output halves of four-wire line permitting two-wire line to be connected. Balancing potentiometer, Rg, adjusts gain of IC2 to null feed through from input to output. Adjustment is done on workbench just after assembly.

  16. Soft magnetic wires

    NASA Astrophysics Data System (ADS)

    Vázquez, M.

    2001-06-01

    An overview of the present state of the art on the preparation techniques, outstanding magnetic properties and applications of soft magnetic micro and nanowires is presented. Rapid solidification techniques (in-rotating-water quenching and drawing methods) to fabricate amorphous microwires with diameter in the range from 100 down to 1 μm are first described. Electrodeposition is also employed to prepare composite microtubes (magnetic coatings) and to fill porous membranes (diameter of the order of 0.1 μm). Magnetic behaviours of interest are related to the different hysteresis loops of samples: square-shaped loops typical of bistable behaviour, and nearly non-hysteretic loop with well-defined transverse anisotropy field. The role played by magnetic dipolar interactions in the magnetic behaviour of arrays of micro and nanowires is described. A particular analysis is done on the giant magnetoimpedance (GMI) effect in the radio and microwave frequency ranges exhibited by ultrasoft microwires. Finally, a few examples of applications are introduced for magnetostrictive and non-magnetostrictive wires, they are: “magnetoelastic pens”, micromotors; DC current-sensors based on GMI, and sharpened amorphous wire tips in spin polarised scanning tunneling microscopy.

  17. Improved superconducting magnet wire

    DOEpatents

    Schuller, I.K.; Ketterson, J.B.

    1983-08-16

    This invention is directed to a superconducting tape or wire composed of alternating layers of copper and a niobium-containing superconductor such as niobium of NbTi, Nb/sub 3/Sn or Nb/sub 3/Ge. In general, each layer of the niobium-containing superconductor has a thickness in the range of about 0.05 to 1.5 times its coherence length (which for Nb/sub 3/Si is 41 A) with each copper layer having a thickness in the range of about 170 to 600 A. With the use of very thin layers of the niobium composition having a thickness within the desired range, the critical field (H/sub c/) may be increased by factors of 2 to 4. Also, the thin layers of the superconductor permit the resulting tape or wire to exhibit suitable ductility for winding on a magnet core. These compositions are also characterized by relatively high values of critical temperature and therefore will exhibit a combination of useful properties as superconductors.

  18. 30 CFR 75.521 - Lightning arresters; ungrounded and exposed power conductors and telephone wires.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Lightning arresters; ungrounded and exposed... Electrical Equipment-General § 75.521 Lightning arresters; ungrounded and exposed power conductors and telephone wires. Each ungrounded, exposed power conductor and each ungrounded, exposed telephone wire...

  19. 30 CFR 75.521 - Lightning arresters; ungrounded and exposed power conductors and telephone wires.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Lightning arresters; ungrounded and exposed... Electrical Equipment-General § 75.521 Lightning arresters; ungrounded and exposed power conductors and telephone wires. Each ungrounded, exposed power conductor and each ungrounded, exposed telephone wire...

  20. 30 CFR 75.521 - Lightning arresters; ungrounded and exposed power conductors and telephone wires.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Lightning arresters; ungrounded and exposed... Electrical Equipment-General § 75.521 Lightning arresters; ungrounded and exposed power conductors and telephone wires. Each ungrounded, exposed power conductor and each ungrounded, exposed telephone wire...

  1. 30 CFR 75.521 - Lightning arresters; ungrounded and exposed power conductors and telephone wires.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Lightning arresters; ungrounded and exposed... Electrical Equipment-General § 75.521 Lightning arresters; ungrounded and exposed power conductors and telephone wires. Each ungrounded, exposed power conductor and each ungrounded, exposed telephone wire...

  2. 30 CFR 75.521 - Lightning arresters; ungrounded and exposed power conductors and telephone wires.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Lightning arresters; ungrounded and exposed... Electrical Equipment-General § 75.521 Lightning arresters; ungrounded and exposed power conductors and telephone wires. Each ungrounded, exposed power conductor and each ungrounded, exposed telephone wire...

  3. 30 CFR 75.517-2 - Plans for insulation of existing bare power wires and cables.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Plans for insulation of existing bare power... Equipment-General § 75.517-2 Plans for insulation of existing bare power wires and cables. (a) On or before December 31, 1970, plans for the insulation of existing bare power wires and cables installed prior...

  4. 30 CFR 57.12008 - Insulation and fittings for power wires and cables.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Insulation and fittings for power wires and cables. 57.12008 Section 57.12008 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF... NONMETAL MINES Electricity Surface and Underground § 57.12008 Insulation and fittings for power wires...

  5. 30 CFR 57.12008 - Insulation and fittings for power wires and cables.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Insulation and fittings for power wires and cables. 57.12008 Section 57.12008 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF... NONMETAL MINES Electricity Surface and Underground § 57.12008 Insulation and fittings for power wires...

  6. 30 CFR 75.517-2 - Plans for insulation of existing bare power wires and cables.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Plans for insulation of existing bare power... Equipment-General § 75.517-2 Plans for insulation of existing bare power wires and cables. (a) On or before December 31, 1970, plans for the insulation of existing bare power wires and cables installed prior...

  7. 30 CFR 57.12008 - Insulation and fittings for power wires and cables.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Insulation and fittings for power wires and cables. 57.12008 Section 57.12008 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF... NONMETAL MINES Electricity Surface and Underground § 57.12008 Insulation and fittings for power wires...

  8. 30 CFR 57.12008 - Insulation and fittings for power wires and cables.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Insulation and fittings for power wires and cables. 57.12008 Section 57.12008 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF... NONMETAL MINES Electricity Surface and Underground § 57.12008 Insulation and fittings for power wires...

  9. 49 CFR 234.267 - Insulation resistance tests, wires in trunking and cables.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Insulation resistance tests, wires in trunking and... Inspections and Tests § 234.267 Insulation resistance tests, wires in trunking and cables. (a) Insulation... thereafter. (b) Insulation resistance tests shall be made between all conductors and ground,...

  10. 49 CFR 234.267 - Insulation resistance tests, wires in trunking and cables.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Insulation resistance tests, wires in trunking and... Inspections and Tests § 234.267 Insulation resistance tests, wires in trunking and cables. (a) Insulation... thereafter. (b) Insulation resistance tests shall be made between all conductors and ground,...

  11. 49 CFR 234.267 - Insulation resistance tests, wires in trunking and cables.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Insulation resistance tests, wires in trunking and... Inspections and Tests § 234.267 Insulation resistance tests, wires in trunking and cables. (a) Insulation... thereafter. (b) Insulation resistance tests shall be made between all conductors and ground,...

  12. 30 CFR 57.12008 - Insulation and fittings for power wires and cables.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Insulation and fittings for power wires and cables. 57.12008 Section 57.12008 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF... NONMETAL MINES Electricity Surface and Underground § 57.12008 Insulation and fittings for power wires...

  13. 30 CFR 75.517-2 - Plans for insulation of existing bare power wires and cables.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Plans for insulation of existing bare power... Equipment-General § 75.517-2 Plans for insulation of existing bare power wires and cables. (a) On or before December 31, 1970, plans for the insulation of existing bare power wires and cables installed prior...

  14. 30 CFR 75.517-2 - Plans for insulation of existing bare power wires and cables.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Plans for insulation of existing bare power... Equipment-General § 75.517-2 Plans for insulation of existing bare power wires and cables. (a) On or before December 31, 1970, plans for the insulation of existing bare power wires and cables installed prior...

  15. 30 CFR 75.517-2 - Plans for insulation of existing bare power wires and cables.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Plans for insulation of existing bare power... Equipment-General § 75.517-2 Plans for insulation of existing bare power wires and cables. (a) On or before December 31, 1970, plans for the insulation of existing bare power wires and cables installed prior...

  16. 7 CFR 1755.700 - RUS specification for aerial service wires.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false RUS specification for aerial service wires. 1755.700 Section 1755.700 Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES..., AND STANDARD CONTRACT FORMS § 1755.700 RUS specification for aerial service wires. §§ 1755.701...

  17. 47 CFR 69.725 - Attribution of revenues to particular wire centers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 3 2010-10-01 2010-10-01 false Attribution of revenues to particular wire... CARRIER SERVICES (CONTINUED) ACCESS CHARGES Pricing Flexibility § 69.725 Attribution of revenues to... competitors have collocated in wire centers accounting for a certain percentage of revenues from the...

  18. 14 CFR 121.1111 - Electrical wiring interconnection systems (EWIS) maintenance program.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Electrical wiring interconnection systems (EWIS) maintenance program. 121.1111 Section 121.1111 Aeronautics and Space FEDERAL AVIATION... Airworthiness and Safety Improvements § 121.1111 Electrical wiring interconnection systems (EWIS)...

  19. 14 CFR 121.1111 - Electrical wiring interconnection systems (EWIS) maintenance program.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Electrical wiring interconnection systems (EWIS) maintenance program. 121.1111 Section 121.1111 Aeronautics and Space FEDERAL AVIATION... Airworthiness and Safety Improvements § 121.1111 Electrical wiring interconnection systems (EWIS)...

  20. 14 CFR 121.1111 - Electrical wiring interconnection systems (EWIS) maintenance program.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Electrical wiring interconnection systems (EWIS) maintenance program. 121.1111 Section 121.1111 Aeronautics and Space FEDERAL AVIATION... Airworthiness and Safety Improvements § 121.1111 Electrical wiring interconnection systems (EWIS)...

  1. 30 CFR 75.902-2 - Approved ground check systems not employing pilot check wires.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Approved ground check systems not employing... Low- and Medium-Voltage Alternating Current Circuits § 75.902-2 Approved ground check systems not employing pilot check wires. Ground check systems not employing pilot check wires will be approved only...

  2. 49 CFR 234.271 - Insulated rail joints, bond wires, and track connections.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Insulated rail joints, bond wires, and track connections. 234.271 Section 234.271 Transportation Other Regulations Relating to Transportation (Continued... Inspections and Tests § 234.271 Insulated rail joints, bond wires, and track connections. Insulated...

  3. 49 CFR 234.271 - Insulated rail joints, bond wires, and track connections.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Insulated rail joints, bond wires, and track connections. 234.271 Section 234.271 Transportation Other Regulations Relating to Transportation (Continued... Inspections and Tests § 234.271 Insulated rail joints, bond wires, and track connections. Insulated...

  4. 46 CFR 169.673 - Installation of wiring for power and lighting circuits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Installation of wiring for power and lighting circuits. 169.673 Section 169.673 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL... power and lighting circuits. (a) Wiring must be run as high as practicable above the bilges. (b)...

  5. 46 CFR 169.673 - Installation of wiring for power and lighting circuits.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Installation of wiring for power and lighting circuits. 169.673 Section 169.673 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL... power and lighting circuits. (a) Wiring must be run as high as practicable above the bilges. (b)...

  6. 46 CFR 169.680 - Installation of wiring for power and lighting circuits.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Installation of wiring for power and lighting circuits... and lighting circuits. (a) Wiring must be run as high as practicable above the bilges. (b) Each cable... box for use in a damp or wet location must be of watertight construction. (n) Each lighting...

  7. 46 CFR 169.673 - Installation of wiring for power and lighting circuits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Installation of wiring for power and lighting circuits. 169.673 Section 169.673 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL... power and lighting circuits. (a) Wiring must be run as high as practicable above the bilges. (b)...

  8. 46 CFR 169.680 - Installation of wiring for power and lighting circuits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Installation of wiring for power and lighting circuits... and lighting circuits. (a) Wiring must be run as high as practicable above the bilges. (b) Each cable... box for use in a damp or wet location must be of watertight construction. (n) Each lighting...

  9. 46 CFR 169.673 - Installation of wiring for power and lighting circuits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Installation of wiring for power and lighting circuits. 169.673 Section 169.673 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL... power and lighting circuits. (a) Wiring must be run as high as practicable above the bilges. (b)...

  10. 46 CFR 169.680 - Installation of wiring for power and lighting circuits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Installation of wiring for power and lighting circuits... and lighting circuits. (a) Wiring must be run as high as practicable above the bilges. (b) Each cable... box for use in a damp or wet location must be of watertight construction. (n) Each lighting...

  11. 46 CFR 169.680 - Installation of wiring for power and lighting circuits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Installation of wiring for power and lighting circuits... and lighting circuits. (a) Wiring must be run as high as practicable above the bilges. (b) Each cable... box for use in a damp or wet location must be of watertight construction. (n) Each lighting...

  12. The Current in a Wire

    ERIC Educational Resources Information Center

    Thompson, Keith

    2009-01-01

    This little problem arose because I was frustrated with the standard electromagnetism texts, which show the magnetic field due to a current-bearing wire outside the wire [proportional to] 1/r and inside [proportional to] r. However, they never point out that the moving electrons must be influenced by the magnetic field created by the other moving…

  13. Aircraft wiring program status report

    NASA Technical Reports Server (NTRS)

    Beach, Rex

    1995-01-01

    In this Naval Air Warfare Center (NAWC) Aircraft Division status report, the general and wire and cable component activities, the systems engineering activities, the aircraft wiring lead maintenance activities, the NAVAIR/NASA interface activities, and the Base Realignment and Closure (BRAC) Commission recommendations are presented.

  14. First Wire-Free Pacemaker Approved

    MedlinePlus

    ... Wire-Free Pacemaker Approved Treats irregular heartbeat without wired leads To use the sharing features on this ... said in a news release. In traditional pacemakers, wired leads may malfunction and require the device to ...

  15. Welding wire pressure sensor assembly

    NASA Technical Reports Server (NTRS)

    Morris, Timothy B. (Inventor); Milly, Peter F., Sr. (Inventor); White, J. Kevin (Inventor)

    1994-01-01

    The present invention relates to a device which is used to monitor the position of a filler wire relative to a base material being welded as the filler wire is added to a welding pool. The device is applicable to automated welding systems wherein nonconsumable electrode arc welding processes are utilized in conjunction with a filler wire which is added to a weld pool created by the electrode arc. The invention senses pressure deviations from a predetermined pressure between the filler wire and the base material, and provides electrical signals responsive to the deviations for actuating control mechanisms in an automatic welding apparatus so as to minimize the pressure deviation and to prevent disengagement of the contact between the filler wire and the base material.

  16. Welding wire pressure sensor assembly

    NASA Astrophysics Data System (ADS)

    Morris, Timothy B.; Milly, Peter F.; White, J. Kevin

    1993-05-01

    The present invention relates to a device which is used to monitor the position of a filler wire relative to a base material being welded as the filler wire is added to a welding pool. The device is applicable to automated welding systems wherein nonconsumable electrode arc welding processes are utilized in conjunction with a filler wire which is added to a weld pool created by the electrode arc. The invention senses pressure deviations from a predetermined pressure between the filler wire and the base material, and provides electrical signals responsive to the deviations for actuating control mechanisms in an automatic welding apparatus so as to minimize the pressure deviation and to prevent disengagement of the contact between the filler wire and the base material.

  17. Welding wire pressure sensor assembly

    NASA Astrophysics Data System (ADS)

    Morris, Timothy B.; Milly, Peter F., Sr.; White, J. Kevin

    1994-04-01

    The present invention relates to a device which is used to monitor the position of a filler wire relative to a base material being welded as the filler wire is added to a welding pool. The device is applicable to automated welding systems wherein nonconsumable electrode arc welding processes are utilized in conjunction with a filler wire which is added to a weld pool created by the electrode arc. The invention senses pressure deviations from a predetermined pressure between the filler wire and the base material, and provides electrical signals responsive to the deviations for actuating control mechanisms in an automatic welding apparatus so as to minimize the pressure deviation and to prevent disengagement of the contact between the filler wire and the base material.

  18. Apollo experience report: Electrical wiring subsystem

    NASA Technical Reports Server (NTRS)

    White, L. D.

    1975-01-01

    The general requirements of the electrical wiring subsystems and the problem areas and solutions that occurred during the major part of the Apollo Program are detailed in this report. The concepts and definitions of specific requirements for electrical wiring; wire-connecting devices; and wire-harness fabrication, checkout, and installation techniques are discussed. The design and development of electrical wiring and wire-connecting devices are described. Mission performance is discussed, and conclusions and recommendations for future programs are presented.

  19. Electrode carrying wire for GTAW welding

    NASA Technical Reports Server (NTRS)

    Morgan, Gene E. (Inventor); Dyer, Gerald E. (Inventor)

    1990-01-01

    A welding torch for gas tungsten arc welding apparatus has a hollow tungsten electrode including a ceramic liner and forms the filler metal wire guide. The wire is fed through the tungsten electrode thereby reducing the size of the torch to eliminate clearance problems which exist with external wire guides. Since the wire is preheated from the tungsten more wire may be fed into the weld puddle, and the wire will not oxidize because it is always within the shielding gas.

  20. Internal wire guide for GTAW welding

    NASA Technical Reports Server (NTRS)

    Morgan, Gene E. (Inventor); Dyer, Gerald E. (Inventor)

    1989-01-01

    A welding torch for gas tungsten arc welding apparatus has a filler metal wire guide positioned within the torch, and within the shielding gas nozzle. The wire guide is adjacent to the tungsten electrode and has a ceramic liner through which the wire is fed. This reduces the size of the torch and eliminates the outside clearance problems that exit with external wire guides. Additionally, since the wire is always within the shielding gas, oxidizing of the wire is eliminated.

  1. Sintered wire cathode

    DOEpatents

    Falce, Louis R.; Ives, R. Lawrence

    2009-06-09

    A porous cathode structure is fabricated from a plurality of wires which are placed in proximity to each other in elevated temperature and pressure for a sintering time. The sintering process produces the porous cathode structure which may be divided into a plurality of individual porous cathodes, one of which may be placed into a dispenser cathode support which includes a cavity for containing a work function reduction material such as BaO, CaO, and Al.sub.2O.sub.3. The work function reduction material migrates through the pores of the porous cathode from a work replenishment surface adjacent to the cavity of the dispenser cathode support to an emitting cathode surface, thereby providing a dispenser cathode which has a uniform work function and therefore a uniform electron emission.

  2. White Rock in False Color

    NASA Technical Reports Server (NTRS)

    2005-01-01

    [figure removed for brevity, see original site]

    The THEMIS VIS camera is capable of capturing color images of the Martian surface using five different color filters. In this mode of operation, the spatial resolution and coverage of the image must be reduced to accommodate the additional data volume produced from using multiple filters. To make a color image, three of the five filter images (each in grayscale) are selected. Each is contrast enhanced and then converted to a red, green, or blue intensity image. These three images are then combined to produce a full color, single image. Because the THEMIS color filters don't span the full range of colors seen by the human eye, a color THEMIS image does not represent true color. Also, because each single-filter image is contrast enhanced before inclusion in the three-color image, the apparent color variation of the scene is exaggerated. Nevertheless, the color variation that does appear is representative of some change in color, however subtle, in the actual scene. Note that the long edges of THEMIS color images typically contain color artifacts that do not represent surface variation.

    This false color image shows the wind eroded deposit in Pollack Crater called 'White Rock'. This image was collected during the Southern Fall Season.

    Image information: VIS instrument. Latitude -8, Longitude 25.2 East (334.8 West). 0 meter/pixel resolution.

    Note: this THEMIS visual image has not been radiometrically nor geometrically calibrated for this preliminary release. An empirical correction has been performed to remove instrumental effects. A linear shift has been applied in the cross-track and down-track direction to approximate spacecraft and planetary motion. Fully calibrated and geometrically projected images will be released through the Planetary Data System in accordance with Project policies at a later time.

    NASA's Jet Propulsion Laboratory manages the 2001 Mars Odyssey mission for NASA's Office of

  3. Southern Spring in False Color

    NASA Technical Reports Server (NTRS)

    2004-01-01

    [figure removed for brevity, see original site]

    The Odyssey spacecraft has completed a full Mars year of observations of the red planet. For the next several weeks the Image of the Day will look back over this first mars year. It will focus on four themes: 1) the poles - with the seasonal changes seen in the retreat and expansion of the caps; 2) craters - with a variety of morphologies relating to impact materials and later alteration, both infilling and exhumation; 3) channels - the clues to liquid surface flow; and 4) volcanic flow features. While some images have helped answer questions about the history of Mars, many have raised new questions that are still being investigated as Odyssey continues collecting data as it orbits Mars.

    This image was collected June 25, 2003 during the southern spring season. This false color image shows both the layered ice cap and darker 'spots' that are seen only when the sun first lights the polar surface.

    Image information: VIS instrument. Latitude -82.3, Longitude 306 East (54 West). 19 meter/pixel resolution.

    Note: this THEMIS visual image has not been radiometrically nor geometrically calibrated for this preliminary release. An empirical correction has been performed to remove instrumental effects. A linear shift has been applied in the cross-track and down-track direction to approximate spacecraft and planetary motion. Fully calibrated and geometrically projected images will be released through the Planetary Data System in accordance with Project policies at a later time.

    NASA's Jet Propulsion Laboratory manages the 2001 Mars Odyssey mission for NASA's Office of Space Science, Washington, D.C. The Thermal Emission Imaging System (THEMIS) was developed by Arizona State University, Tempe, in collaboration with Raytheon Santa Barbara Remote Sensing. The THEMIS investigation is led by Dr. Philip Christensen at Arizona State University. Lockheed Martin Astronautics, Denver, is the prime contractor for the

  4. Iani Chaos in False Color

    NASA Technical Reports Server (NTRS)

    2005-01-01

    [figure removed for brevity, see original site]

    The THEMIS VIS camera is capable of capturing color images of the Martian surface using five different color filters. In this mode of operation, the spatial resolution and coverage of the image must be reduced to accommodate the additional data volume produced from using multiple filters. To make a color image, three of the five filter images (each in grayscale) are selected. Each is contrast enhanced and then converted to a red, green, or blue intensity image. These three images are then combined to produce a full color, single image. Because the THEMIS color filters don't span the full range of colors seen by the human eye, a color THEMIS image does not represent true color. Also, because each single-filter image is contrast enhanced before inclusion in the three-color image, the apparent color variation of the scene is exaggerated. Nevertheless, the color variation that does appear is representative of some change in color, however subtle, in the actual scene. Note that the long edges of THEMIS color images typically contain color artifacts that do not represent surface variation.

    This false color image of a portion of the Iani Chaos region was collected during the Southern Fall season.

    Image information: VIS instrument. Latitude -2.6 Longitude 342.4 East (17.6 West). 36 meter/pixel resolution.

    Note: this THEMIS visual image has not been radiometrically nor geometrically calibrated for this preliminary release. An empirical correction has been performed to remove instrumental effects. A linear shift has been applied in the cross-track and down-track direction to approximate spacecraft and planetary motion. Fully calibrated and geometrically projected images will be released through the Planetary Data System in accordance with Project policies at a later time.

    NASA's Jet Propulsion Laboratory manages the 2001 Mars Odyssey mission for NASA's Office of Space Science, Washington, D.C. The

  5. Mimas Showing False Colors #2

    NASA Technical Reports Server (NTRS)

    2005-01-01

    This false color image of Saturn's moon Mimas reveals variation in either the composition or texture across its surface.

    During its approach to Mimas on Aug. 2, 2005, the Cassini spacecraft narrow-angle camera obtained multi-spectral views of the moon from a range of 228,000 kilometers (142,500 miles).

    This image is a color composite of narrow-angle ultraviolet, green, infrared and clear filter images, which have been specially processed to accentuate subtle changes in the spectral properties of Mimas' surface materials. To create this view, three color images (ultraviolet, green and infrared) were combined with a single black and white picture that isolates and maps regional color differences to create the final product.

    Shades of blue and violet in the image at the right are used to identify surface materials that are bluer in color and have a weaker infrared brightness than average Mimas materials, which are represented by green.

    Herschel crater, a 140-kilometer-wide (88-mile) impact feature with a prominent central peak, is visible in the upper right of the image. The unusual bluer materials are seen to broadly surround Herschel crater. However, the bluer material is not uniformly distributed in and around the crater. Instead, it appears to be concentrated on the outside of the crater and more to the west than to the north or south. The origin of the color differences is not yet understood. It may represent ejecta material that was excavated from inside Mimas when the Herschel impact occurred. The bluer color of these materials may be caused by subtle differences in the surface composition or the sizes of grains making up the icy soil.

    This image was obtained when the Cassini spacecraft was above 25 degrees south, 134 degrees west latitude and longitude. The Sun-Mimas-spacecraft angle was 45 degrees and north is at the top.

    The Cassini-Huygens mission is a cooperative project of NASA, the European Space Agency and the Italian

  6. 46 CFR 28.865 - Wiring methods and materials.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 33 CFR 183.425 and 183.430; and (2) For circuits of 50 volts or greater: (i) Meet section 310-13 and... 46 Shipping 1 2010-10-01 2010-10-01 false Wiring methods and materials. 28.865 Section 28.865... the circuit. (b) Each conductor must be No. 22 AWG or larger. Conductors in power and...

  7. 46 CFR 28.865 - Wiring methods and materials.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 33 CFR 183.425 and 183.430; and (2) For circuits of 50 volts or greater: (i) Meet section 310-13 and... 46 Shipping 1 2013-10-01 2013-10-01 false Wiring methods and materials. 28.865 Section 28.865... the circuit. (b) Each conductor must be No. 22 AWG or larger. Conductors in power and...

  8. 30 CFR 56.12053 - Circuits powered from trolley wires.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Circuits powered from trolley wires. 56.12053 Section 56.12053 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES...

  9. 30 CFR 56.12012 - Bare signal wires.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Bare signal wires. 56.12012 Section 56.12012 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Electricity §...

  10. 30 CFR 56.12012 - Bare signal wires.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Bare signal wires. 56.12012 Section 56.12012 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Electricity §...

  11. 30 CFR 56.12050 - Installation of trolley wires.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Installation of trolley wires. 56.12050 Section 56.12050 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES...

  12. 30 CFR 56.12053 - Circuits powered from trolley wires.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Circuits powered from trolley wires. 56.12053 Section 56.12053 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES...

  13. 30 CFR 56.12050 - Installation of trolley wires.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Installation of trolley wires. 56.12050 Section 56.12050 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES...

  14. 30 CFR 56.12050 - Installation of trolley wires.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Installation of trolley wires. 56.12050 Section 56.12050 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES...

  15. 30 CFR 56.12053 - Circuits powered from trolley wires.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Circuits powered from trolley wires. 56.12053 Section 56.12053 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES...

  16. 30 CFR 57.12012 - Bare signal wires.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Bare signal wires. 57.12012 Section 57.12012 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL AND NONMETAL MINES Electricity...

  17. 30 CFR 56.12050 - Installation of trolley wires.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Installation of trolley wires. 56.12050 Section 56.12050 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES...

  18. 30 CFR 56.12012 - Bare signal wires.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Bare signal wires. 56.12012 Section 56.12012 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Electricity §...

  19. 30 CFR 56.12050 - Installation of trolley wires.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Installation of trolley wires. 56.12050 Section 56.12050 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES...

  20. 30 CFR 56.12012 - Bare signal wires.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Bare signal wires. 56.12012 Section 56.12012 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Electricity §...

  1. 30 CFR 56.12012 - Bare signal wires.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Bare signal wires. 56.12012 Section 56.12012 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Electricity §...

  2. 30 CFR 56.12053 - Circuits powered from trolley wires.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Circuits powered from trolley wires. 56.12053 Section 56.12053 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES...

  3. 30 CFR 56.12053 - Circuits powered from trolley wires.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Circuits powered from trolley wires. 56.12053 Section 56.12053 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES...

  4. 30 CFR 57.12012 - Bare signal wires.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Bare signal wires. 57.12012 Section 57.12012 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL AND NONMETAL MINES Electricity...

  5. 46 CFR 120.340 - Cable and wiring requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Cable and wiring requirements. 120.340 Section 120.340 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE THAN 150 PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS ELECTRICAL INSTALLATION Power Sources and Distribution Systems...

  6. 30 CFR 57.14160 - Mantrip trolley wire hazards underground.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Mantrip trolley wire hazards underground. 57.14160 Section 57.14160 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL AND...

  7. 29 CFR 1919.33 - Proof tests-wire rope.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 7 2013-07-01 2013-07-01 false Proof tests-wire rope. 1919.33 Section 1919.33 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) GEAR CERTIFICATION Certification of Vessels: Tests and Proof Loads; Heat Treatment;...

  8. 29 CFR 1919.33 - Proof tests-wire rope.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 7 2012-07-01 2012-07-01 false Proof tests-wire rope. 1919.33 Section 1919.33 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) GEAR CERTIFICATION Certification of Vessels: Tests and Proof Loads; Heat Treatment;...

  9. 29 CFR 1919.33 - Proof tests-wire rope.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 7 2014-07-01 2014-07-01 false Proof tests-wire rope. 1919.33 Section 1919.33 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) GEAR CERTIFICATION Certification of Vessels: Tests and Proof Loads; Heat Treatment;...

  10. Mimas Showing False Colors #1

    NASA Technical Reports Server (NTRS)

    2005-01-01

    False color images of Saturn's moon, Mimas, reveal variation in either the composition or texture across its surface.

    During its approach to Mimas on Aug. 2, 2005, the Cassini spacecraft narrow-angle camera obtained multi-spectral views of the moon from a range of 228,000 kilometers (142,500 miles).

    The image at the left is a narrow angle clear-filter image, which was separately processed to enhance the contrast in brightness and sharpness of visible features. The image at the right is a color composite of narrow-angle ultraviolet, green, infrared and clear filter images, which have been specially processed to accentuate subtle changes in the spectral properties of Mimas' surface materials. To create this view, three color images (ultraviolet, green and infrared) were combined into a single black and white picture that isolates and maps regional color differences. This 'color map' was then superimposed over the clear-filter image at the left.

    The combination of color map and brightness image shows how the color differences across the Mimas surface materials are tied to geological features. Shades of blue and violet in the image at the right are used to identify surface materials that are bluer in color and have a weaker infrared brightness than average Mimas materials, which are represented by green.

    Herschel crater, a 140-kilometer-wide (88-mile) impact feature with a prominent central peak, is visible in the upper right of each image. The unusual bluer materials are seen to broadly surround Herschel crater. However, the bluer material is not uniformly distributed in and around the crater. Instead, it appears to be concentrated on the outside of the crater and more to the west than to the north or south. The origin of the color differences is not yet understood. It may represent ejecta material that was excavated from inside Mimas when the Herschel impact occurred. The bluer color of these materials may be caused by subtle differences in

  11. Plasma chemistry in wire chambers

    SciTech Connect

    Wise, J.

    1990-05-01

    The phenomenology of wire chamber aging is discussed and fundamentals of proportional counters are presented. Free-radical polymerization and plasma polymerization are discussed. The chemistry of wire aging is reviewed. Similarities between wire chamber plasma (>1 atm dc-discharge) and low-pressure rf-discharge plasmas, which have been more widely studied, are suggested. Construction and use of a system to allow study of the plasma reactions occurring in wire chambers is reported. A proportional tube irradiated by an {sup 55}Fe source is used as a model wire chamber. Condensable species in the proportional tube effluent are concentrated in a cryotrap and analyzed by gas chromatography/mass spectrometry. Several different wire chamber gases (methane, argon/methane, ethane, argon/ethane, propane, argon/isobutane) are tested and their reaction products qualitatively identified. For all gases tested except those containing methane, use of hygroscopic filters to remove trace water and oxygen contaminants from the gas resulted in an increase in the average molecular weight of the products, consistent with results from low-pressure rf-discharge plasmas. It is suggested that because water and oxygen inhibit polymer growth in the gas phase that they may also reduce polymer deposition in proportional tubes and therefore retard wire aging processes. Mechanistic implications of the plasma reactions of hydrocarbons with oxygen are suggested. Unresolved issues in this work and proposals for further study are discussed.

  12. Effect of opening helix on flying wire emittance measurements

    SciTech Connect

    Pruss, Stan; /Fermilab

    1996-04-01

    It has been noted for some time that after the protons are injected, when the helix is opened the proton normalized vertical emittance (as measured by the flying wires) increases by about two {pi} mm-mr. The horizontal emittance decreases by about the same amount. This has been recognized as a false result, but there has been uncertainty as to whether it was due to the flying wires not measuring the beam sigma correctly when the beam center moved at the wires or whether the effective beta at the wires changed when the helix was opened and the orbit changed all around the machine. This study attempts to answer that question. The study took place Sunday, Feb. 25, 1996, from 18:30 to 22:30. The study consisted of injecting P1, P2 and P3 as normal, coalesced bunches and P4 and P5 as uncoalesced bunch trains of nominally 11 bunches. The purpose in using more than a single bunch was to increase statistical sampling and to investigate whether there was any significant difference between coalesced and uncoalesced bunches. Because the injection kicker had a long flat-top for 36 bunch studies, P6 could not be injected and when P5 was injected, P1 emittance increased by about two {pi} mm-mr. The flying wires were flown several times, the helix was turned on, the wires flown several times, the helix turned off, and the wires flown several times. The helix cycling was performed by knobbing the power supplies to avoid any possible emittance dilution from a non-adiabatic change. note that during the helix off state during helix cycling, one of the power supplies for the horizontal separators was inadvertently not turned down to zero, leaving the horizontal part of the helix at {approx} 16% of normal. After three cycles of helix on-off, a local horizontal three bump was made to duplicate the horizontal orbit change at the E11 wires and the wires were flown several times. The local bump was removed and the wires flown several times. Finally, the protons were put onto the pbar helix

  13. 77 FR 71259 - Taking of Marine Mammals Incidental to Commercial Fishing Operations; False Killer Whale Take...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-29

    ... wire diameter regulation. We understand, based on public comment (see comment/response 33), that there... regulations have been promulgated. 3. Main Hawaiian Islands Longline Fishing Prohibited Area An existing... necessary for false killer whales. See comments/responses 3-5 and 38-41 ] below for more detail on...

  14. Requirements for printed wiring boards

    NASA Technical Reports Server (NTRS)

    1984-01-01

    In order to maintain the high standards of the NASA printed wiring programs, this publication: prescribes NASA's requirements for assuring reliable rigid printed wiring boards; describes and incorporates basic considerations necessary to assure reliable rigid printed wiring boards; establishes the supplier's responsibility to train and certify personnel; provides for supplier documentation of the fabrication and inspection procedures to be used for NASA work, including supplier innovations and changes in technology; and provides visual workmanship standards to aid those responsible for determining quality conformance to the established requirements.

  15. Demonstrating Forces between Parallel Wires.

    ERIC Educational Resources Information Center

    Baker, Blane

    2000-01-01

    Describes a physics demonstration that dramatically illustrates the mutual repulsion (attraction) between parallel conductors using insulated copper wire, wooden dowels, a high direct current power supply, electrical tape, and an overhead projector. (WRM)

  16. Method of manufacturing superconductor wire

    SciTech Connect

    Motowidlo, Leszek

    2014-09-16

    A method for forming Nb.sub.3Sn superconducting wire is provided. The method employs a powder-in-tube process using a high-tin intermetallic compound, such as MnSn.sub.2, for producing the Nb.sub.3Sn. The use of a high-tin intermetallic compound enables the process to perform hot extrusion without melting the high-tin intermetallic compound. Alternatively, the method may entail drawing the wire without hot extrusion.

  17. Smart Wire Grid: Resisting Expectations

    SciTech Connect

    Ramsay, Stewart; Lowe, DeJim

    2014-03-03

    Smart Wire Grid's DSR technology (Discrete Series Reactor) can be quickly deployed on electrical transmission lines to create intelligent mesh networks capable of quickly rerouting electricity to get power where and when it's needed the most. With their recent ARPA-E funding, Smart Wire Grid has been able to move from prototype and field testing to building out a US manufacturing operation in just under a year.

  18. Smart Wire Grid: Resisting Expectations

    ScienceCinema

    Ramsay, Stewart; Lowe, DeJim

    2014-04-09

    Smart Wire Grid's DSR technology (Discrete Series Reactor) can be quickly deployed on electrical transmission lines to create intelligent mesh networks capable of quickly rerouting electricity to get power where and when it's needed the most. With their recent ARPA-E funding, Smart Wire Grid has been able to move from prototype and field testing to building out a US manufacturing operation in just under a year.

  19. HTS Wire Development Workshop: Proceedings

    SciTech Connect

    Not Available

    1994-07-01

    The 1994 High-Temperature Superconducting Wire Development Workshop was held on February 16--17 at the St. Petersburg Hilton and Towers in St. Petersburg, Florida. The meeting was hosted by Florida Power Corporation and sponsored by the US Department of Energy`s Superconductivity Program for Electric Power Systems. The meeting focused on recent high-temperature superconducting wire development activities in the Department of Energy`s Superconductivity Systems program. The meeting opened with a general discussion on the needs and benefits of superconductivity from a utility perspective, the US global competitiveness position, and an outlook on the overall prospects of wire development. The meeting then focused on four important technology areas: Wire characterization: issues and needs; technology for overcoming barriers: weak links and flux pinning; manufacturing issues for long wire lengths; and physical properties of HTS coils. Following in-depth presentations, working groups were formed in each technology area to discuss the most important current research and development issues. The working groups identified research areas that have the potential for greatly enhancing the wire development effort. These areas are discussed in the summary reports from each of the working groups. This document is a compilation of the workshop proceedings including all general session presentations and summary reports from the working groups.

  20. 1 mil gold bond wire study.

    SciTech Connect

    Huff, Johnathon; McLean, Michael B.; Jenkins, Mark W.; Rutherford, Brian Milne

    2013-05-01

    In microcircuit fabrication, the diameter and length of a bond wire have been shown to both affect the current versus fusing time ratio of a bond wire as well as the gap length of the fused wire. This study investigated the impact of current level on the time-to-open and gap length of 1 mil by 60 mil gold bond wires. During the experiments, constant current was provided for a control set of bond wires for 250ms, 410ms and until the wire fused; non-destructively pull-tested wires for 250ms; and notched wires. The key findings were that as the current increases, the gap length increases and 73% of the bond wires will fuse at 1.8A, and 100% of the wires fuse at 1.9A within 60ms. Due to the limited scope of experiments and limited data analyzed, further investigation is encouraged to confirm these observations.

  1. Fabrication of Pd-Cr wire

    NASA Technical Reports Server (NTRS)

    Diamond, Sidney; Leach, Dennen M.

    1989-01-01

    Fabrication of Pd-13 percent Cr alloy wires is described. Melting, casting, swaging and annealing processes are discussed. Drawing to reach two diameters (0.003 inch and 0.00176 inch) of wire is described. Representative micrographs of the Pd-Cr alloy at selected stages during wire fabrication are included. The resistance of the wire was somewhat lower, by about 15 to 20 percent, than comparable wire of other alloys used for strain gages.

  2. Experimental Results for Space-Wire-D

    NASA Astrophysics Data System (ADS)

    Parkes, Steve; Gibson, David; Ferrer, Albert

    2015-09-01

    SpaceWire-D is a deterministic extension to SpaceWire that uses time-division multiplexing to schedule traffic within time-slots. It allows a single SpaceWire network to be used for both time-critical avionics control applications and asynchronous payload data-handling simultaneously using existing SpaceWire technology. In this paper we describe the services of SpaceWire-D and present experimental results for each service.

  3. Connecting to Thermocouples with Fewer Lead Wires

    NASA Technical Reports Server (NTRS)

    Goldsby, Jon C.

    2003-01-01

    A simple technique has been devised to reduce the number of lead wires needed to connect an array of thermocouples to the instruments (e.g., voltmeters) used to read their output voltages. Because thermocouple wires are usually made of expensive metal alloys, reducing the number of lead wires can effect a considerable reduction in the cost of such an array. Reducing the number of wires also reduces the number of terminals and the amount of space needed to accommodate the wires.

  4. Phase sensitive guidance sensor for wire-following vehicles

    NASA Technical Reports Server (NTRS)

    Hansen, G. R. (Inventor)

    1984-01-01

    A guidance sensor for a wire-following vehicle which is phase sensitive, includes an array of coils positioned to sense the vertical component of a magnetic field produced by the ac current through the guidance wire. The outputs of the coils are fed to associated flip flops. Flip flops associated with coils, through which flux passes in one direction, e.g., up, are driven to one state, e.g., true, and flip flops associated with coils through which flux passes in the opposite direction, e.g., down, are driven to a false state. The control signal to guide the vehicle over the wire is a function of the number of flip flops in the true state. Circuitry is included to prevent flip flops from assuming a wrong state due to noise.

  5. 19 CFR 111.32 - False information.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 19 Customs Duties 1 2010-04-01 2010-04-01 false False information. 111.32 Section 111.32 Customs... CUSTOMS BROKERS Duties and Responsibilities of Customs Brokers § 111.32 False information. A broker must... procure the giving of, any false or misleading information or testimony in any matter pending before...

  6. Wire chambers revisited.

    PubMed

    Ott, R J

    1993-04-01

    Detectors used for radioisotope imaging have, historically, been based on scintillating crystal/photomultiplier combinations in various forms. From the rectilinear scanner through to modern gamma cameras and positron cameras, the basic technology has remained much the same. Efforts to overcome the limitations of this form of technology have foundered on the inability to reproduce the required sensitivity, spatial resolution and sensitive area at acceptable cost. Multiwire proportional chambers (MWPCs) have long been used as position-sensitive charged particle detectors in nuclear and high-energy physics. MWPCs are large-area gas-filled ionisation chambers in which large arrays of fine wires are used to measure the position of ionisation produced in the gas by the passage of charged particles. The important properties of MWPCs are high-spatial-resolution, large-area, high-count-rate performance at low cost. For research applications, detectors several metres square have been built and small-area detectors have a charged particle resolution of 0.4 mm at a count rate of several million per second. Modification is required to MWPCs for nuclear medicine imaging. As gamma rays or X-rays cannot be detected directly, they must be converted into photo- or Compton scatter electrons. Photon-electron conversion requires the use of high atomic number materials in the body of the chamber. Pressurised xenon is the most useful form of "gas only" photon-electron convertor and has been used successfully in a gamma camera for the detection of gamma rays at energies below 100 keV. This camera has been developed specifically for high-count-rate first-pass cardiac imaging. This high-pressure xenon gas MWPC is the key to a highly competitive system which can outperform scintillator-based systems. The count rate performance is close to a million counts per second and the intrinsic spatial resolution is better than the best scintillator-based camera. The MWPC camera produces quantitative

  7. Plasma arc torch with coaxial wire feed

    DOEpatents

    Hooper, Frederick M

    2002-01-01

    A plasma arc welding apparatus having a coaxial wire feed. The apparatus includes a plasma arc welding torch, a wire guide disposed coaxially inside of the plasma arc welding torch, and a hollow non-consumable electrode. The coaxial wire guide feeds non-electrified filler wire through the tip of the hollow non-consumable electrode during plasma arc welding. Non-electrified filler wires as small as 0.010 inches can be used. This invention allows precision control of the positioning and feeding of the filler wire during plasma arc welding. Since the non-electrified filler wire is fed coaxially through the center of the plasma arc torch's electrode and nozzle, the wire is automatically aimed at the optimum point in the weld zone. Therefore, there is no need for additional equipment to position and feed the filler wire from the side before or during welding.

  8. Californium Recovery from Palladium Wire

    SciTech Connect

    Burns, Jon D.

    2014-08-01

    The recovery of 252Cf from palladium-252Cf cermet wires was investigated to determine the feasibility of implementing it into the cermet wire production operation at Oak Ridge National Laboratory’s Radiochemical Engineering Development Center. The dissolution of Pd wire in 8 M HNO3 and trace amounts of HCl was studied at both ambient and elevated temperatures. These studies showed that it took days to dissolve the wire at ambient temperature and only 2 hours at 60°C. Adjusting the ratio of the volume of solvent to the mass of the wire segment showed little change in the kinetics of dissolution, which ranged from 0.176 mL/mg down to 0.019 mL/mg. A successful chromatographic separation of 153Gd, a surrogate for 252Cf, from Pd was demonstrated using AG 50x8 cation exchange resin with a bed volume of 0.5 mL and an internal diameter of 0.8 cm.

  9. Antenna coupled photonic wire lasers.

    PubMed

    Kao, Tsung-Yu; Cai, Xiaowei; Lee, Alan W M; Reno, John L; Hu, Qing

    2015-06-29

    Slope efficiency (SE) is an important performance metric for lasers. In conventional semiconductor lasers, SE can be optimized by careful designs of the facet (or the modulation for DFB lasers) dimension and surface. However, photonic wire lasers intrinsically suffer low SE due to their deep sub-wavelength emitting facets. Inspired by microwave engineering techniques, we show a novel method to extract power from wire lasers using monolithically integrated antennas. These integrated antennas significantly increase the effective radiation area, and consequently enhance the power extraction efficiency. When applied to wire lasers at THz frequency, we achieved the highest single-side slope efficiency (~450 mW/A) in pulsed mode for DFB lasers at 4 THz and a ~4x increase in output power at 3 THz compared with a similar structure without antennas. This work demonstrates the versatility of incorporating microwave engineering techniques into laser designs, enabling significant performance enhancements. PMID:26191717

  10. 30 CFR 75.902-4 - Attachment of ground conductors and ground check wires to equipment frames; use of separate...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Attachment of ground conductors and ground check wires to equipment frames; use of separate connections. 75.902-4 Section 75.902-4 Mineral... § 75.902-4 Attachment of ground conductors and ground check wires to equipment frames; use of...

  11. 30 CFR 77.902-3 - Attachment of ground conductors and ground check wires to equipment frames; use of separate...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Attachment of ground conductors and ground check wires to equipment frames; use of separate connections. 77.902-3 Section 77.902-3 Mineral...-Voltage Alternating Current Circuits § 77.902-3 Attachment of ground conductors and ground check wires...

  12. 30 CFR 75.902-4 - Attachment of ground conductors and ground check wires to equipment frames; use of separate...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Attachment of ground conductors and ground check wires to equipment frames; use of separate connections. 75.902-4 Section 75.902-4 Mineral... § 75.902-4 Attachment of ground conductors and ground check wires to equipment frames; use of...

  13. 30 CFR 75.902-4 - Attachment of ground conductors and ground check wires to equipment frames; use of separate...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Attachment of ground conductors and ground check wires to equipment frames; use of separate connections. 75.902-4 Section 75.902-4 Mineral... § 75.902-4 Attachment of ground conductors and ground check wires to equipment frames; use of...

  14. 30 CFR 77.902-3 - Attachment of ground conductors and ground check wires to equipment frames; use of separate...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Attachment of ground conductors and ground check wires to equipment frames; use of separate connections. 77.902-3 Section 77.902-3 Mineral...-Voltage Alternating Current Circuits § 77.902-3 Attachment of ground conductors and ground check wires...

  15. 30 CFR 77.902-3 - Attachment of ground conductors and ground check wires to equipment frames; use of separate...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Attachment of ground conductors and ground check wires to equipment frames; use of separate connections. 77.902-3 Section 77.902-3 Mineral...-Voltage Alternating Current Circuits § 77.902-3 Attachment of ground conductors and ground check wires...

  16. 30 CFR 75.902-4 - Attachment of ground conductors and ground check wires to equipment frames; use of separate...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Attachment of ground conductors and ground check wires to equipment frames; use of separate connections. 75.902-4 Section 75.902-4 Mineral... § 75.902-4 Attachment of ground conductors and ground check wires to equipment frames; use of...

  17. 30 CFR 75.902-4 - Attachment of ground conductors and ground check wires to equipment frames; use of separate...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Attachment of ground conductors and ground check wires to equipment frames; use of separate connections. 75.902-4 Section 75.902-4 Mineral... § 75.902-4 Attachment of ground conductors and ground check wires to equipment frames; use of...

  18. 30 CFR 77.902-3 - Attachment of ground conductors and ground check wires to equipment frames; use of separate...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Attachment of ground conductors and ground check wires to equipment frames; use of separate connections. 77.902-3 Section 77.902-3 Mineral...-Voltage Alternating Current Circuits § 77.902-3 Attachment of ground conductors and ground check wires...

  19. Designing potentials by sculpturing wires

    SciTech Connect

    Della Pietra, Leonardo; Aigner, Simon; Groth, Soenke; Hagen, Christoph von; Schmiedmayer, Joerg; Bar-Joseph, Israel; Lezec, Henri J.

    2007-06-15

    Magnetic trapping potentials for atoms on atom chips are determined by the current flow in the chip wires. By modifying the shape of the conductor we can realize specialized current flow patterns and therefore microdesign the trapping potentials. We have demonstrated this by nano-machining an atom chip using the focused ion beam technique. We built a trap, a barrier, and using a Bose-Einstein Condensate as a probe we showed that by polishing the conductor edge the potential roughness on the selected wire can be reduced. Furthermore, we give different other designs and discuss the creation of a one-dimensional magnetic lattice on an atom chip.

  20. 20 CFR 356.3 - False claims.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 1 2010-04-01 2010-04-01 false False claims. 356.3 Section 356.3 Employees' Benefits RAILROAD RETIREMENT BOARD ADMINISTRATIVE REMEDIES FOR FRAUDULENT CLAIMS OR STATEMENTS CIVIL MONETARY PENALTY INFLATION ADJUSTMENT § 356.3 False claims. In the case of penalties assessed under 31...

  1. 20 CFR 356.3 - False claims.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 1 2011-04-01 2011-04-01 false False claims. 356.3 Section 356.3 Employees' Benefits RAILROAD RETIREMENT BOARD ADMINISTRATIVE REMEDIES FOR FRAUDULENT CLAIMS OR STATEMENTS CIVIL MONETARY PENALTY INFLATION ADJUSTMENT § 356.3 False claims. In the case of penalties assessed under 31...

  2. 20 CFR 356.3 - False claims.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 1 2012-04-01 2012-04-01 false False claims. 356.3 Section 356.3 Employees' Benefits RAILROAD RETIREMENT BOARD ADMINISTRATIVE REMEDIES FOR FRAUDULENT CLAIMS OR STATEMENTS CIVIL MONETARY PENALTY INFLATION ADJUSTMENT § 356.3 False claims. In the case of penalties assessed under 31...

  3. An Association Account of False Belief Understanding

    ERIC Educational Resources Information Center

    De Bruin, L. C.; Newen, A.

    2012-01-01

    The elicited-response false belief task has traditionally been considered as reliably indicating that children acquire an understanding of false belief around 4 years of age. However, recent investigations using spontaneous-response tasks suggest that false belief understanding emerges much earlier. This leads to a developmental paradox: if young…

  4. 30 CFR 281.5 - False statements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false False statements. 281.5 Section 281.5 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR OFFSHORE LEASING OF MINERALS OTHER THAN OIL, GAS, AND SULPHUR IN THE OUTER CONTINENTAL SHELF General § 281.5 False statements. Under...

  5. Anode wire aging tests with selected gases

    SciTech Connect

    Kadyk, J.; Wise, J.; Hess, D.; Williams, M. )

    1990-04-01

    As a continuation of earlier wire aging investigations, additional candidates for wire chamber gas and wire have been tested. These include the gases: argon/ethane, HRS gas, dimethyl ether, carbon dioxide/ethane, and carbon tetrafluoride/isobutane. Wires used were: gold- plated tungsten, Stablohm, Nicotin, and Stainless Steel. Measurements were made of the effects upon wire aging of impurities from plumbing materials or contamination from various types of oil. Attempts were made to induce wire aging by adding measured amounts of oxygen and halogen (methyl chloride) with negative results. In this paper, the possible role of electronegativity in the wire aging process is discussed, and measurements of electronegativity are made with several single carbon Freons, using both an electron capture detector and a wire chamber operating with dimethyl ether.

  6. Electrical wire insulation and electromagnetic coil

    DOEpatents

    Bich, George J.; Gupta, Tapan K.

    1984-01-01

    An electromagnetic coil for high temperature and high radiation application in which glass is used to insulate the electrical wire. A process for applying the insulation to the wire is disclosed which results in improved insulation properties.

  7. Quality control of microelectronic wire bonds

    NASA Technical Reports Server (NTRS)

    Thiel, R. A.; Schmidt, G. D.

    1975-01-01

    Report evaluates ultrasonic bonding of small-diameter aluminum wire joined to ceramic substrates metalized with thin-film and thick-film gold. Quick testing technique for nondestructive location of poor wire bonds is also presented.

  8. Put Your Cable Wiring to the Test.

    ERIC Educational Resources Information Center

    Day, C. William

    2001-01-01

    Discusses why schools and universities should use testing procedures in any wire bid specification for cable wiring and also know how experienced the installers are in testing and installing structured cabling systems. Key cabling terms are included. (GR)

  9. New insulation constructions for aerospace wiring applications

    NASA Technical Reports Server (NTRS)

    Slenski, George

    1994-01-01

    Outlined in this presentation is the background to insulation constructions for aerospace wiring applications, the Air Force wiring policy, the purpose and contract requirements of new insulation constructions, the test plan, and the test results.

  10. A manually set magnetic wire counter

    NASA Technical Reports Server (NTRS)

    1972-01-01

    Magnetic storage wire counter design principles are given. Magnetic storage wire was coupled with two phase propagational driver in manual set counter shift register. Time delay between magnetic counter domain insertion and corresponding output pulse provides counting functions.

  11. Technique for stripping Teflon insulated wire

    NASA Technical Reports Server (NTRS)

    Babb, B. D.

    1967-01-01

    Cryogenic stripping of Teflon insulated wire leaves no residue and produces no physical damage. After the wire is immersed in liquid nitrogen, bent slightly, and returned to room temperature, the Teflon is removed by fingernails or flat-nosed pliers.

  12. Wire Capture Programs for Macintosh and IBM.

    ERIC Educational Resources Information Center

    Wiley, Gale

    1989-01-01

    Discusses wire capture programs (computer programs which gather and process wire services such as the Associated Press or United Press) for computer labs in journalism departments. Describes details of such programs for Macintosh, IBM, and IBM clones. (SR)

  13. Electrical Wire Insulation and Electromagnetic Coil

    SciTech Connect

    Bich, G. J.; Gupta, T. K.

    1984-01-31

    An electromagnetic coil for high temperature and high radiation application in which glass is used to insulate the electrical wire. A process for applying the insulation to the wire is disclosed which results in improved insulation properties.

  14. 47 CFR 54.522 - [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 3 2011-10-01 2011-10-01 false 54.522 Section 54.522 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES (CONTINUED) UNIVERSAL SERVICE Universal Service Support for Schools and Libraries §...

  15. 47 CFR 54.517 - [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 3 2011-10-01 2011-10-01 false 54.517 Section 54.517 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES (CONTINUED) UNIVERSAL SERVICE Universal Service Support for Schools and Libraries §...

  16. 47 CFR 54.506 - [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 3 2011-10-01 2011-10-01 false 54.506 Section 54.506 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES (CONTINUED) UNIVERSAL SERVICE Universal Service Support for Schools and Libraries §...

  17. 48 CFR 1315.407 - Special cost or pricing areas.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Special cost or pricing... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 1315.407 Special cost or pricing areas....

  18. 48 CFR 1815.403 - Obtaining cost or pricing data.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Obtaining cost or pricing... ADMINISTRATION CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 1815.403 Obtaining cost or pricing data....

  19. 48 CFR 15.407 - Special cost or pricing areas.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Special cost or pricing... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.407 Special cost or pricing areas....

  20. 48 CFR 1815.407 - Special cost or pricing areas.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Special cost or pricing... ADMINISTRATION CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 1815.407 Special cost or pricing areas....

  1. 48 CFR 1219.1005 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Applicability. 1219.1005 Section 1219.1005 Federal Acquisition Regulations System DEPARTMENT OF TRANSPORTATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Small Business Competitiveness Demonstration Program...

  2. 42 CFR 37.50 - Interpreting and classifying chest roentgenograms.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false Interpreting and classifying chest roentgenograms... MEDICAL CARE AND EXAMINATIONS SPECIFICATIONS FOR MEDICAL EXAMINATIONS OF UNDERGROUND COAL MINERS Chest Roentgenographic Examinations Specifications for Interpretation, Classification, and Submission of...

  3. 48 CFR 53.301-1423 - Inventory Verification Survey.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 2 2011-10-01 2011-10-01 false Inventory Verification Survey. 53.301-1423 Section 53.301-1423 Federal Acquisition Regulations System FEDERAL ACQUISITION... Survey. ER05AP04.000...

  4. 48 CFR 970.0404 - Safeguarding classified information.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Safeguarding classified information. 970.0404 Section 970.0404 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY... classified information....

  5. 48 CFR 914.409-2 - Award of classified contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... classified contracts. DOE regulations regarding the safeguarding of restricted data and procedures for its destruction are contained at 10 CFR part 1016. ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Award of...

  6. 50 CFR 665.99 - Area restrictions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 50 Wildlife and Fisheries 11 2011-10-01 2011-10-01 false Area restrictions. 665.99 Section 665.99 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION... Ocean Survey Chart Number 83484....

  7. 48 CFR 27.204 - Patented technology under trade agreements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Patented technology under trade agreements. 27.204 Section 27.204 Federal Acquisition Regulations System FEDERAL ACQUISITION... Patented technology under trade agreements....

  8. 48 CFR 225.7005 - Restriction on certain chemical weapons antidote.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Restriction on certain chemical weapons antidote. 225.7005 Section 225.7005 Federal Acquisition Regulations System DEFENSE... on certain chemical weapons antidote....

  9. 48 CFR 25.702 - Prohibition on contracting with entities that conduct restricted business operations in Sudan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Prohibition on contracting with entities that conduct restricted business operations in Sudan. 25.702 Section 25.702 Federal... operations in Sudan....

  10. 48 CFR 3017.204 - Contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 7 2011-10-01 2011-10-01 false Contracts. 3017.204... ACQUISITION REGULATION (HSAR) CONTRACT METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Options. 3017.204 Contracts....

  11. 48 CFR 1.602 - Contracting officers.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Contracting officers. 1... FEDERAL ACQUISITION REGULATIONS SYSTEM Career Development, Contracting Authority, and Responsibilities 1.602 Contracting officers....

  12. 48 CFR 19.808 - Contract negotiation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Contract negotiation. 19... PROGRAMS SMALL BUSINESS PROGRAMS Contracting With the Small Business Administration (the 8(a) Program) 19.808 Contract negotiation....

  13. 48 CFR 215.404 - Proposal analysis.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Proposal analysis. 215.404 Section 215.404 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT... Proposal analysis....

  14. 49 CFR 236.764 - Locking, lever operated.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Locking, lever operated. 236.764 Section 236.764... Locking, lever operated. The mechanical locking of an interlocking machine which is actuated by means of the lever....

  15. 47 CFR 27.1221 - Interference protection.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 2 2011-10-01 2011-10-01 false Interference protection. 27.1221 Section 27.1221 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES MISCELLANEOUS WIRELESS COMMUNICATIONS SERVICES Broadband Radio Service and Educational Broadband...

  16. 47 CFR 27.1239 - Reimbursement obligation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 2 2011-10-01 2011-10-01 false Reimbursement obligation. 27.1239 Section 27.1239 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES MISCELLANEOUS WIRELESS COMMUNICATIONS SERVICES Broadband Radio Service and Educational Broadband...

  17. 48 CFR 811.103 - Market acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Market acceptance. 811.103 Section 811.103 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS COMPETITION AND... acceptance....

  18. 48 CFR 619.804-3 - SBA acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false SBA acceptance. 619.804-3 Section 619.804-3 Federal Acquisition Regulations System DEPARTMENT OF STATE SOCIOECONOMIC PROGRAMS SMALL... acceptance....

  19. 48 CFR 619.804 - Evaluation, offering, and acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Evaluation, offering, and acceptance. 619.804 Section 619.804 Federal Acquisition Regulations System DEPARTMENT OF STATE SOCIOECONOMIC....804 Evaluation, offering, and acceptance....

  20. 48 CFR 225.7102 - Forgings.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Forgings. 225.7102 Section 225.7102 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF... Forgings....

  1. 49 CFR 178.33a - Specification 2Q; inner nonrefillable metal receptacles.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Specification 2Q; inner nonrefillable metal receptacles. 178.33a Section 178.33a Transportation Other Regulations Relating to Transportation (Continued... nonrefillable metal receptacles....

  2. 49 CFR 178.33 - Specification 2P; inner nonrefillable metal receptacles.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Specification 2P; inner nonrefillable metal receptacles. 178.33 Section 178.33 Transportation Other Regulations Relating to Transportation (Continued... nonrefillable metal receptacles....

  3. 48 CFR 249.110 - Settlement negotiation memorandum.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Settlement negotiation... Settlement negotiation memorandum. Follow the procedures at PGI 249.110 for preparation of a settlement negotiation memorandum....

  4. 48 CFR 619.808 - Contract negotiation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Contract negotiation. 619.808 Section 619.808 Federal Acquisition Regulations System DEPARTMENT OF STATE SOCIOECONOMIC PROGRAMS... Contract negotiation....

  5. 48 CFR 836.606 - Negotiations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Negotiations. 836.606 Section 836.606 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS SPECIAL CATEGORIES... Negotiations....

  6. 48 CFR 212.7102 - Pilot program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... OF DEFENSE ACQUISITION PLANNING ACQUISITION OF COMMERCIAL ITEMS Pilot Program for Acquisition of Military-Purpose Nondevelopmental Items 212.7102 Pilot program. ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Pilot program....

  7. 48 CFR 239.7408 - Special construction.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Special construction. 239.7408 Section 239.7408 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM... Telecommunications Services 239.7408 Special construction....

  8. 48 CFR 211.204 - Solicitation provisions and contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Acquisition Streamlining and Standardization Information System database, use provisions, as appropriate... Descriptions Not Listed in the Acquisition Streamlining and Standardization Information System (ASSIST), and... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Solicitation...

  9. 48 CFR 209.104 - Standards.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Standards. 209.104 Section 209.104 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF... Standards....

  10. 48 CFR 4.501 - [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false 4.501 Section 4.501 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL ADMINISTRATIVE MATTERS Electronic Commerce in Contracting 4.501...

  11. 49 CFR 236.731 - Controller, circuit.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Controller, circuit. A device for opening and closing electric circuits. ... 49 Transportation 4 2011-10-01 2011-10-01 false Controller, circuit. 236.731 Section 236.731 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD...

  12. 48 CFR 204.7103 - Contract line items.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Contract line items. 204..., DEPARTMENT OF DEFENSE GENERAL ADMINISTRATIVE MATTERS Uniform Contract Line Item Numbering System 204.7103 Contract line items....

  13. 48 CFR 204.7104 - Contract subline items.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Contract subline items... SYSTEM, DEPARTMENT OF DEFENSE GENERAL ADMINISTRATIVE MATTERS Uniform Contract Line Item Numbering System 204.7104 Contract subline items....

  14. 48 CFR 922.804 - Affirmative action programs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Affirmative action programs. 922.804 Section 922.804 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SOCIOECONOMIC... Affirmative action programs....

  15. 48 CFR 1522.804 - Affirmative action programs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Affirmative action programs. 1522.804 Section 1522.804 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY....804 Affirmative action programs....

  16. 48 CFR 1422.804 - Affirmative action programs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Affirmative action programs. 1422.804 Section 1422.804 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR....804 Affirmative action programs....

  17. 49 CFR 229.17 - Accident reports.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... CFR part 225. ... 49 Transportation 4 2011-10-01 2011-10-01 false Accident reports. 229.17 Section 229.17..., DEPARTMENT OF TRANSPORTATION RAILROAD LOCOMOTIVE SAFETY STANDARDS General § 229.17 Accident reports. (a)...

  18. 47 CFR 15.321 - [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false 15.321 Section 15.321 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL RADIO FREQUENCY DEVICES Unlicensed Personal Communications Service Devices § 15.321...

  19. 48 CFR 803.405 - Misrepresentations or violations of the Covenant Against Contingent Fees.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... referrals of suspected fraudulent or criminal matters to the Department of Justice under FAR 3.405(b)(4... the Department of Justice. ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Misrepresentations...

  20. 48 CFR 25.703 - Prohibition on contracting with entities that engage in certain activities relating to Iran.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Prohibition on contracting with entities that engage in certain activities relating to Iran. 25.703 Section 25.703 Federal... to Iran....

  1. 48 CFR 1511.011-79 - Information resources management.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Information resources... AGENCY ACQUISITION PLANNING DESCRIBING AGENCY NEEDS 1511.011-79 Information resources management. The... Resource Management, in all solicitations and contracts....

  2. 48 CFR 232.503 - Postaward matters.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Postaward matters. 232.503 Section 232.503 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT....503 Postaward matters....

  3. 48 CFR 232.502 - Preaward matters.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Preaward matters. 232.502 Section 232.502 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT....502 Preaward matters....

  4. 48 CFR 1803.104 - Procurement integrity.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Procurement integrity. 1803.104 Section 1803.104 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... Procurement integrity....

  5. 48 CFR 203.104 - Procurement integrity.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Procurement integrity. 203.104 Section 203.104 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM....104 Procurement integrity....

  6. 49 CFR 178.348 - Specification DOT 412; cargo tank motor vehicle.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Specification DOT 412; cargo tank motor vehicle...) SPECIFICATIONS FOR PACKAGINGS Specifications for Containers for Motor Vehicle Transportation § 178.348 Specification DOT 412; cargo tank motor vehicle....

  7. 49 CFR 178.346 - Specification DOT 406; cargo tank motor vehicle.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Specification DOT 406; cargo tank motor vehicle...) SPECIFICATIONS FOR PACKAGINGS Specifications for Containers for Motor Vehicle Transportation § 178.346 Specification DOT 406; cargo tank motor vehicle....

  8. 48 CFR 970.2201-2 - Overtime management.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Overtime management. 970... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Application of Labor Policies 970.2201-2 Overtime management....

  9. 48 CFR 970.3770 - Facilities management.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Facilities management. 970... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Facilities Management Contracting 970.3770 Facilities management....

  10. 42 CFR 485.58 - Condition of participation: Comprehensive rehabilitation program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 5 2011-10-01 2011-10-01 false Condition of participation: Comprehensive... OF HEALTH AND HUMAN SERVICES (CONTINUED) STANDARDS AND CERTIFICATION CONDITIONS OF PARTICIPATION: SPECIALIZED PROVIDERS Conditions of Participation: Comprehensive Outpatient Rehabilitation Facilities §...

  11. 48 CFR 871.208 - Rehabilitation facilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Rehabilitation facilities... DEPARTMENT SUPPLEMENTARY REGULATIONS LOAN GUARANTY AND VOCATIONAL REHABILITATION AND EMPLOYMENT PROGRAMS Vocational Rehabilitation and Employment Service 871.208 Rehabilitation facilities. Charges by...

  12. 48 CFR 236.206 - Liquidated damages.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Liquidated damages. 236... Aspects of Contracting for Construction 236.206 Liquidated damages. See 211.503 for instructions on use of liquidated damages....

  13. 49 CFR 236.337 - Locking faces of mechanical locking; fit.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Locking faces of mechanical locking; fit. 236.337... Rules and Instructions § 236.337 Locking faces of mechanical locking; fit. Locking faces shall fit... face....

  14. 48 CFR 2001.101 - Purpose.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Acquisition Regulation (FAR) (48 CFR Chapter 1). ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Purpose. 2001.101 Section 2001.101 Federal Acquisition Regulations System NUCLEAR REGULATORY COMMISSION GENERAL...

  15. 48 CFR 970.35 - Research and development contracting.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Research and development contracting. 970.35 Section 970.35 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY... development contracting....

  16. 43 CFR 2912.1 - Nature of interest.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Nature of interest. 2912.1 Section 2912.1 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT... Nature of interest....

  17. 48 CFR 2414.404 - Rejection of bids.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Rejection of bids. 2414.404 Section 2414.404 Federal Acquisition Regulations System DEPARTMENT OF HOUSING AND URBAN... 2414.404 Rejection of bids....

  18. 48 CFR 803.570 - Commercial advertising.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Commercial advertising. 803.570 Section 803.570 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS GENERAL... Commercial advertising....

  19. 47 CFR 10.2 - Purpose.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false Purpose. 10.2 Section 10.2 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL MOBILE ALERT SYSTEM General Information § 10.2... Mobile Alert System....

  20. 47 CFR 10.540 - Attestation requirement. [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false Attestation requirement. 10.540 Section 10.540 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL MOBILE ALERT SYSTEM Equipment Requirements § 10.540 Attestation requirement....

  1. 47 CFR 10.460 - Retransmission frequency. [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false Retransmission frequency. 10.460 Section 10.460 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL MOBILE ALERT SYSTEM Alert Message Requirements § 10.460 Retransmission frequency....

  2. 47 CFR 11.12 - Two-tone Attention Signal encoder and decoder.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false Two-tone Attention Signal encoder and decoder. 11.12 Section 11.12 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL EMERGENCY ALERT... provide an audio alert....

  3. 47 CFR 1.1417 - Allocation of Unusable Space Costs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false Allocation of Unusable Space Costs. 1.1417 Section 1.1417 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL PRACTICE AND PROCEDURE Pole... Management and Budget....

  4. 46 CFR 176.818 - Sanitary inspection.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Sanitary inspection. 176.818 Section 176.818 Shipping...) INSPECTION AND CERTIFICATION Material Inspections § 176.818 Sanitary inspection. At each inspection for... sanitary condition....

  5. 47 CFR 74.643 - Interference to geostationary-satellites.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false Interference to geostationary-satellites. 74... Television Broadcast Auxiliary Stations § 74.643 Interference to geostationary-satellites. Applicants and... geostationary-satellites....

  6. 47 CFR 80.333 - Stations in the maritime mobile-satellite service.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Stations in the maritime mobile-satellite..., Alarm, Urgency and Safety Procedures § 80.333 Stations in the maritime mobile-satellite service. The...-satellite service....

  7. 47 CFR 25.219 - [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 2 2011-10-01 2011-10-01 false 25.219 Section 25.219 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Technical Standards § 25.219...

  8. 48 CFR 470.200 - [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false 470.200 Section 470.200 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE FOOD ASSISTANCE PROGRAMS COMMODITY ACQUISITIONS 470.200...

  9. 48 CFR 3009.570 - Limitations on contractors acting as lead system integrators.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 7 2011-10-01 2011-10-01 false Limitations on contractors acting as lead system integrators. 3009.570 Section 3009.570 Federal Acquisition Regulations System... contractors acting as lead system integrators....

  10. 47 CFR 73.3574 - Processing of international broadcast station applications.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false Processing of international broadcast station... of international broadcast station applications. (a) Applications for International station... such amended application. (c) Applications for International stations will be processed as nearly...

  11. 47 CFR 76.227 - [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false 76.227 Section 76.227 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Cablecasting § 76.227...

  12. 48 CFR 952.204 - Clauses related to administrative matters.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Clauses related to administrative matters. 952.204 Section 952.204 Federal Acquisition Regulations System DEPARTMENT OF ENERGY... Clauses related to administrative matters....

  13. 42 CFR 5a.2 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false Applicability. 5a.2 Section 5a.2 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL PROVISIONS RURAL PHYSICIAN... Public Health Service Act....

  14. 48 CFR 209.104-4 - Subcontractor responsibility.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 209.104-4 Subcontractor responsibility. Generally, the Canadian Commercial Corporation... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false...

  15. 49 CFR 178.33b - Specification 2S; inner nonrefillable plastic receptacles.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Specification 2S; inner nonrefillable plastic receptacles. 178.33b Section 178.33b Transportation Other Regulations Relating to Transportation (Continued... nonrefillable plastic receptacles....

  16. 47 CFR 52.36 - Standard data fields for simple port order processing.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) Zip code; (4) Company code; (5) New network service provider; (6) Desired due date; (7) Purchase order... Office of Management and Budget. ... 47 Telecommunication 3 2011-10-01 2011-10-01 false Standard data fields for simple port...

  17. 43 CFR 3103.4 - Production incentives.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Production incentives. 3103.4 Section 3103.4 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT... Production incentives....

  18. 48 CFR 970.3002 - CAS program requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false CAS program requirements. 970.3002 Section 970.3002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY....3002 CAS program requirements....

  19. 43 CFR 3103.1 - Payments.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Payments. 3103.1 Section 3103.1 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT... Payments....

  20. 48 CFR 3028.106 - Administration.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 7 2011-10-01 2011-10-01 false Administration. 3028.106 Section 3028.106 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY... 3028.106 Administration....

  1. 48 CFR 1825.003 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Definitions. 1825.003 Section 1825.003 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION 1825.003 Definitions....

  2. 48 CFR 242.705 - Final indirect cost rates.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Final indirect cost rates..., DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Indirect Cost Rates 242.705 Final indirect cost rates....

  3. 47 CFR 213.1 - Background and purpose.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Background and purpose. 213.1 Section 213.1 Telecommunication OFFICE OF SCIENCE AND TECHNOLOGY POLICY AND NATIONAL SECURITY COUNCIL GOVERNMENT AND PUBLIC... effect....

  4. 43 CFR 9268.5 - Wilderness management. [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Wilderness management. 9268.5 Section 9268.5 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT... Wilderness management....

  5. 48 CFR Appendixes G-H to Chapter 7 - [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false G Appendixes G-H to Chapter 7 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT Appendixes G-H to Chapter 7...

  6. 48 CFR 225.7703 - Acquisition of products or services other than small arms.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Acquisition of products or services other than small arms. 225.7703 Section 225.7703 Federal Acquisition Regulations System DEFENSE... than small arms....

  7. 47 CFR 10.300 - Alert aggregator. [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false Alert aggregator. 10.300 Section 10.300 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL MOBILE ALERT SYSTEM System Architecture § 10.300 Alert aggregator....

  8. 47 CFR 10.310 - Federal alert gateway. [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false Federal alert gateway. 10.310 Section 10.310 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL MOBILE ALERT SYSTEM System Architecture § 10.310 Federal alert gateway....

  9. 48 CFR 243.204-70 - Definitization of change orders.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 243.204-70 Definitization of change orders. ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Definitization of...

  10. 47 CFR 68.162 - Requirements for Telecommunication Certification Bodies.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... technical regulation interpretations. The competence of the telecommunication certification body shall be... 47 Telecommunication 3 2011-10-01 2011-10-01 false Requirements for Telecommunication Certification Bodies. 68.162 Section 68.162 Telecommunication FEDERAL COMMUNICATIONS COMMISSION...

  11. 47 CFR 32.15 - [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 2 2011-10-01 2011-10-01 false 32.15 Section 32.15 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES UNIFORM SYSTEM OF ACCOUNTS FOR TELECOMMUNICATIONS COMPANIES General Instructions § 32.15...

  12. 48 CFR 3032.006 - Reduction or suspension of contract payments upon finding of fraud.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 7 2011-10-01 2011-10-01 false Reduction or suspension of contract payments upon finding of fraud. 3032.006 Section 3032.006 Federal Acquisition Regulations System... finding of fraud....

  13. 48 CFR Appendix G to Chapter 2 - [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false G Appendix G to Chapter 2 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE Appendix G to Chapter 2...

  14. 48 CFR 1327.305 - Administration of patent rights clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Administration of patent... GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Patent Rights Under Government Contracts 1327.305 Administration of patent rights clauses....

  15. 48 CFR 1227.305 - Administration of patent rights clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Administration of patent... TRANSPORTATION GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Patent Rights Under Government Contracts 1227.305 Administration of patent rights clauses....

  16. 48 CFR 27.201 - Patent and copyright infringement liability.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Patent and copyright... REGULATION GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Patents and Copyrights 27.201 Patent and copyright infringement liability....

  17. 48 CFR 27.305 - Administration of patent rights clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Administration of patent... REGULATION GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Patent Rights under Government Contracts 27.305 Administration of patent rights clauses....

  18. 48 CFR 2427.305 - Administration of patent rights clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Administration of patent... AND URBAN DEVELOPMENT SOCIOECONOMIC PROGRAMS PATENTS, DATA, AND COPYRIGHTS Patent Rights Under Government Contracts 2427.305 Administration of patent rights clauses....

  19. 48 CFR 1427.201 - Patent and copyright infringement liability.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Patent and copyright... INTERIOR GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Patents and Copyrights 1427.201 Patent and copyright infringement liability....

  20. 48 CFR 970.0470 - Department of Energy Directives.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Department of Energy Directives. 970.0470 Section 970.0470 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY... Energy Directives....

  1. 47 CFR 73.6023 - Distributed transmission systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false Distributed transmission systems. 73.6023... RADIO BROADCAST SERVICES Class A Television Broadcast Stations § 73.6023 Distributed transmission... distributed transmission system....

  2. 46 CFR 184.704 - Marine sanitation devices.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 33 CFR part 159. ... 46 Shipping 7 2011-10-01 2011-10-01 false Marine sanitation devices. 184.704 Section 184.704... TONS) VESSEL CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Miscellaneous § 184.704 Marine...

  3. 48 CFR 1331.205 - Selected costs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Selected costs. 1331.205... REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial Organizations 1331.205 Selected costs....

  4. 48 CFR 31.205 - Selected costs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Selected costs. 31.205... REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial Organizations 31.205 Selected costs....

  5. 48 CFR 931.205 - Selected costs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Selected costs. 931.205... REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial Organizations 931.205 Selected costs....

  6. 48 CFR 1231.205 - Selected costs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Selected costs. 1231.205... REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial Organizations 1231.205 Selected costs....

  7. 46 CFR 196.05-5 - Charts and nautical publications.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 33 CFR 164.33. ... 46 Shipping 7 2011-10-01 2011-10-01 false Charts and nautical publications. 196.05-5 Section 196.05-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH...

  8. 46 CFR 385.2 - Scope.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 8 2011-10-01 2011-10-01 false Scope. 385.2 Section 385.2 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION MISCELLANEOUS RESEARCH AND DEVELOPMENT GRANT AND COOPERATIVE..., exclusions, issuance, arrangement, publication, and exceptions....

  9. 43 CFR 1784.4 - Public participation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Public participation. 1784.4 Section 1784.4 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT... Public participation....

  10. 46 CFR 54.05-25 - [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 2 2011-10-01 2011-10-01 false 54.05-25 Section 54.05-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PRESSURE VESSELS Toughness Tests § 54.05-25...

  11. 48 CFR 209.406 - Debarment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Debarment. 209.406 Section... DEFENSE ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 209.406 Debarment....

  12. 48 CFR 3409.406 - Debarment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 7 2011-10-01 2011-10-01 false Debarment. 3409.406... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 3409.406 Debarment....

  13. 48 CFR 570.117 - Sustainable requirements for lease acquisition.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Sustainable requirements... Sustainable requirements for lease acquisition. Contracting officers must include sustainable design...'s sustainable requirements identified in this part....

  14. 45 CFR 98.82 - Coordination.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... childhood development programs. ... 45 Public Welfare 1 2011-10-01 2011-10-01 false Coordination. 98.82 Section 98.82 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION CHILD CARE AND DEVELOPMENT FUND Indian...

  15. 48 CFR 970.0370 - Management Controls and Improvements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal Conflicts of Interest 970.0370 Management Controls and Improvements. ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Management Controls...

  16. 48 CFR 1545.309 - Providing Government production and research property under special restrictions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Regulations System ENVIRONMENTAL PROTECTION AGENCY CONTRACT MANAGEMENT GOVERNMENT PROPERTY Providing Government Property to Contractors 1545.309 Providing Government production and research property under... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Providing...

  17. 48 CFR 5416.203 - Fixed-price contracts with economic price adjustment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 7 2011-10-01 2011-10-01 false Fixed-price contracts with economic price adjustment. 5416.203 Section 5416.203 Federal Acquisition Regulations System DEFENSE... contracts with economic price adjustment....

  18. 49 CFR 220.21 - Railroad operating rules; radio communications; recordkeeping.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... meaning given these terms in 49 CFR Part 1201. ... 49 Transportation 4 2011-10-01 2011-10-01 false Railroad operating rules; radio communications...) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Radio and...

  19. 48 CFR 250.104 - Residual powers.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Residual powers. 250.104 Section 250.104 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT... Contractual Actions 250.104 Residual powers....

  20. 48 CFR 970.5001 - Residual powers.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Residual powers. 970.5001 Section 970.5001 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY....5001 Residual powers....