Science.gov

Sample records for 2011-10-01 true reclamation

  1. 43 CFR 422.3 - Reclamation law enforcement policy.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Regulations, 43 CFR 2; and 383 DM 15, Freedom of Information Act Handbook (see www.doi.gov); (g) To ensure... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Reclamation law enforcement policy. 422.3..., DEPARTMENT OF THE INTERIOR LAW ENFORCEMENT AUTHORITY AT BUREAU OF RECLAMATION PROJECTS § 422.3...

  2. 43 CFR 422.10 - Requirements for authorizing officers to exercise Reclamation law enforcement authority.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Requirements for authorizing officers to exercise Reclamation law enforcement authority. 422.10 Section 422.10 Public Lands: Interior Regulations... exercise Reclamation law enforcement authority. (a) The CLEO must ensure that each officer receiving...

  3. 43 CFR 3601.40 - Mining and reclamation plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Mining and reclamation plans. 3601.40... Materials Disposal; General Provisions Mining and Reclamation Plans § 3601.40 Mining and reclamation plans. BLM may require you to submit mining and reclamation plans before we begin any environmental review...

  4. 43 CFR 426.17 - Small reclamation projects.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Small reclamation projects. 426.17 Section... OF THE INTERIOR ACREAGE LIMITATION RULES AND REGULATIONS § 426.17 Small reclamation projects. (a) Effect of the RRA on loan contracts made under the Small Reclamation Projects Act. (1) If a...

  5. 43 CFR 404.17 - How will Reclamation evaluate my statement of interest?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false How will Reclamation evaluate my statement of interest? 404.17 Section 404.17 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.17 How will Reclamation evaluate my statement...

  6. 43 CFR 404.22 - How will Reclamation evaluate my full proposal?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false How will Reclamation evaluate my full proposal? 404.22 Section 404.22 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.22 How will Reclamation evaluate my full proposal?...

  7. 43 CFR 404.3 - What is the Reclamation Rural Water Supply Program?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false What is the Reclamation Rural Water Supply... RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.3 What is the Reclamation Rural Water Supply Program? This program addresses domestic, municipal, and industrial...

  8. 43 CFR 3931.20 - Reclamation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Reclamation. 3931.20 Section 3931.20 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT..., subsidence holes, surface excavations, or workings which are a hazard to people or animals. These...

  9. 43 CFR 404.32 - Can Reclamation reduce the non-Federal cost-share required for an appraisal investigation?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Can Reclamation reduce the non-Federal cost-share required for an appraisal investigation? 404.32 Section 404.32 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Cost-Sharing § 404.32...

  10. 43 CFR 404.27 - How will Reclamation evaluate my request to review an appraisal investigation or feasibility...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false How will Reclamation evaluate my request to review an appraisal investigation or feasibility study completed without the support of Reclamation? 404.27 Section 404.27 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR...

  11. 43 CFR 404.25 - How can I request Reclamation to review an appraisal investigation or feasibility study that was...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false How can I request Reclamation to review an appraisal investigation or feasibility study that was not completed under this program? 404.25 Section 404.25 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL...

  12. 43 CFR 404.30 - How much Federal funding can Reclamation provide for the completion of an appraisal investigation?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false How much Federal funding can Reclamation provide for the completion of an appraisal investigation? 404.30 Section 404.30 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Cost-Sharing §...

  13. 43 CFR 404.37 - How will Reclamation determine the appropriate non-Federal share of construction costs?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false How will Reclamation determine the appropriate non-Federal share of construction costs? 404.37 Section 404.37 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Cost-Sharing § 404.37 How...

  14. 43 CFR 404.14 - How will Reclamation provide notice of opportunities for assistance under the program?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false How will Reclamation provide notice of opportunities for assistance under the program? 404.14 Section 404.14 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.14 How...

  15. 43 CFR 404.23 - How will Reclamation determine whether you or your contractor is qualified to conduct an...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false How will Reclamation determine whether you or your contractor is qualified to conduct an appraisal investigation or a feasibility study? 404.23 Section 404.23 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL...

  16. 43 CFR 404.33 - How much Federal funding can Reclamation provide for the completion of a feasibility study?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false How much Federal funding can Reclamation provide for the completion of a feasibility study? 404.33 Section 404.33 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Cost-Sharing § 404.33...

  17. 43 CFR 404.12 - Can Reclamation provide assistance with the construction of a rural water supply project under...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Can Reclamation provide assistance with the construction of a rural water supply project under this program? 404.12 Section 404.12 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview...

  18. 43 CFR 422.10 - Requirements for authorizing officers to exercise Reclamation law enforcement authority.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Requirements for authorizing officers to exercise Reclamation law enforcement authority. 422.10 Section 422.10 Public Lands: Interior Regulations... exercise Reclamation law enforcement authority. (a) The CLEO must ensure that each officer receiving...

  19. 43 CFR 404.21 - What is Reclamation's role in preparing the full proposal?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false What is Reclamation's role in preparing the full proposal? 404.21 Section 404.21 Public Lands: Interior Regulations Relating to Public Lands....21 What is Reclamation's role in preparing the full proposal? (a) If you are requesting...

  20. 43 CFR 404.39 - What factors will Reclamation consider in evaluating my capability to pay 25 percent or more of...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false What factors will Reclamation consider in evaluating my capability to pay 25 percent or more of the construction costs? 404.39 Section 404.39 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY...

  1. 43 CFR 3601.43 - What is the process for BLM to approve my mining and reclamation plans?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... § 3601.43 What is the process for BLM to approve my mining and reclamation plans? (a) After reviewing... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false What is the process for BLM to approve my mining and reclamation plans? 3601.43 Section 3601.43 Public Lands: Interior Regulations Relating...

  2. 43 CFR 404.26 - Must an appraisal investigation be completed before I can request Reclamation to review a...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Must an appraisal investigation be completed before I can request Reclamation to review a feasibility study that was not completed under this program? 404.26 Section 404.26 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE...

  3. 43 CFR 404.24 - How will Reclamation determine whether it is cost-effective for me or my contractor to conduct...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false How will Reclamation determine whether it is cost-effective for me or my contractor to conduct the appraisal investigation or feasibility study? 404.24 Section 404.24 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR...

  4. 43 CFR 429.26 - When may Reclamation reduce or waive costs or fees?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false When may Reclamation reduce or waive costs or fees? 429.26 Section 429.26 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF... reduce or waive costs or fees? (a) As determined appropriate and approved and documented by...

  5. 43 CFR 404.34 - Can Reclamation reduce the amount of non-Federal cost-share required for a feasibility study?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Can Reclamation reduce the amount of non-Federal cost-share required for a feasibility study? 404.34 Section 404.34 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Cost-Sharing § 404.34...

  6. 43 CFR 404.36 - Will Reclamation reimburse me for the cost of an appraisal investigation or a feasibility study...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Will Reclamation reimburse me for the cost of an appraisal investigation or a feasibility study that was not completed under § 404.11(a) or (b)? 404.36 Section 404.36 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR...

  7. 43 CFR 404.52 - Who will the feasibility report be provided to?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Who will the feasibility report be provided... RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Feasibility Studies § 404.52 Who will the feasibility report be provided to? Upon its completion, Reclamation will: (a) Provide...

  8. Water Reclamation and Reuse.

    ERIC Educational Resources Information Center

    Smith, Daniel W.

    1978-01-01

    Presents a literature review of water reclamation and reuse. This review covers: (1) water resources planning; (2) agriculture and irrigation; (3) ground recharge; (4) industrial reuse; (5) health considerations; and (6) technology developments. A list of 217 references is also presented. (HM)

  9. WILLOW CREEK RECLAMATION PROJECT

    EPA Science Inventory

    Working in cooperation with the EPA, Colorado Division of Minerals and Geology, and others, the Willow Creek Reclamation Committee (WCRC) will investigate the sources and character of water entering the mine workings on the Amethyst vein near the town of Creede, Colorado. Activi...

  10. RECLAMATION OF PYRITIC WASTE

    EPA Science Inventory

    The reclamation of land used for the disposal of pyritic mine waste utilizing sewage sludge as a soil conditioner has been studied in laboratory greenhouse studies and a full-scale demonstration project. Analysis of samples revealed that some of the mining waste had a pH as low a...

  11. Trees for reclamation

    SciTech Connect

    Not Available

    1980-01-01

    Land reclamation programs sponsored by several state forestry organizations are summarized in these presentations. The use of trees as a preferred specie for revegetation of surface mined lands is addressed. Modern methods of forestry can be used to make land economically and aesthetically acceptable. Tree planting techniques are presented and the role of Mycorrhizae is discussed. There are 30 papers included in this proceedings. States represented include: Alabama, Arkansas, Georgia, Illinois, Kansas, Kentucky, Maryland, Virginia, Iowa, Ohio, Pennsylvania, and West Virginia.

  12. 31 CFR 240.9 - Reclamation procedures; reclamation protests.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... protests. 240.9 Section 240.9 Money and Finance: Treasury Regulations Relating to Money and Finance...; reclamation protests. (a) Reclamation procedures. (1) Treasury will send a “REQUEST FOR REFUND (CHECK..., by filing a protest in accordance with § 240.9(b), request Treasury to review its decision that...

  13. Water Reclamation and Reuse.

    PubMed

    Huang, Chunkai; Zeng, Ping; Yang, Sen; Shao, Yanxi; Liu, Yang

    2016-10-01

    A review of the literature published in 2015 on topics relating to water reclamation and reuse is presented. The review is divided into the following sections: (1) General: extent of reuse, research needs, guidelines and monitoring, health effects; (2) Treatment technologies: integrated process design, membrane treatment, membrane bioreactors, electrocoagulation, ion exchange and adsorption, disinfection, wetlands, managed aquifer recharge; (3) Planning and management: public acceptance and education, economics/pricing, water quality planning and management and project/case studies. Much of the water treatment research focuses on membrane treatment, integrated designs, and other innovative technologies. PMID:27620090

  14. 43 CFR 402.6 - Price.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Price. 402.6 Section 402.6 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR SALE OF LANDS IN FEDERAL RECLAMATION PROJECTS Public Lands § 402.6 Price. The price of land sold under...

  15. 43 CFR 402.5 - Procedures within the Department.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Procedures within the Department. 402.5 Section 402.5 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR SALE OF LANDS IN FEDERAL RECLAMATION PROJECTS Public Lands § 402.5...

  16. 43 CFR 402.2 - What lands may be sold; method of sale; limit of acreage.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true What lands may be sold; method of sale; limit of acreage. 402.2 Section 402.2 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR SALE OF LANDS IN FEDERAL RECLAMATION PROJECTS Public...

  17. 43 CFR 402.3 - Power to sell.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Power to sell. 402.3 Section 402.3 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR SALE OF LANDS IN FEDERAL RECLAMATION PROJECTS Public Lands § 402.3 Power to sell. The Commissioner...

  18. 43 CFR 402.8 - Terms of sale.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Terms of sale. 402.8 Section 402.8 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR SALE OF LANDS IN FEDERAL RECLAMATION PROJECTS Public Lands § 402.8 Terms of sale. (a) Under the Acts...

  19. 43 CFR 402.11 - Termination or cancellation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Termination or cancellation. 402.11 Section 402.11 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR SALE OF LANDS IN FEDERAL RECLAMATION PROJECTS Public Lands § 402.11 Termination...

  20. 43 CFR 402.1 - Purpose of this subpart.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Purpose of this subpart. 402.1 Section 402.1 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR SALE OF LANDS IN FEDERAL RECLAMATION PROJECTS Public Lands § 402.1 Purpose of...

  1. 43 CFR 402.4 - Citizenship requirement.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Citizenship requirement. 402.4 Section 402.4 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR SALE OF LANDS IN FEDERAL RECLAMATION PROJECTS Public Lands § 402.4...

  2. 43 CFR 402.7 - Notice of sale.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Notice of sale. 402.7 Section 402.7 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR SALE OF LANDS IN FEDERAL RECLAMATION PROJECTS Public Lands § 402.7 Notice of sale. The sale of lands...

  3. 43 CFR 431.9 - Future regulations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Future regulations. 431.9 Section 431.9 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE... CANYON PROJECT, ARIZONA/NEVADA § 431.9 Future regulations. (a) Reclamation may from time to...

  4. 43 CFR 404.31 - What forms of non-Federal cost-share payment are acceptable?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Principles of the Office of Management and Budget, codified at 2 CFR 220, 225, and 230, and in the Federal... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true What forms of non-Federal cost-share... BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM...

  5. 43 CFR 418.27 - Distribution system operation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Distribution system operation. 418.27 Section 418.27 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Operations and Management § 418.27...

  6. 43 CFR 426.25 - Reclamation audits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Reclamation audits. 426.25 Section 426.25 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR ACREAGE LIMITATION RULES AND REGULATIONS § 426.25 Reclamation audits. Reclamation will...

  7. WASTE ACID DETOXIFICATION AND RECLAMATION

    EPA Science Inventory

    This Environmental Security Technology Certification Program (ESTCP) project demonstrated the Waste Acid Detoxification and Reclamation (WADR) systems ability to recover waste electropolish acid solutions generated during the manufacturing of gun-tubes, and reuse the clean acid. ...

  8. Land reclamation research

    SciTech Connect

    1980-09-01

    The United States Department of Energy has assigned its Office of Environment the task of developing methods that will prevent or reduce damages caused by surface mining. Before that task can be accomplished, more must be learned about the functioning of organisms and their surroundings-the ecosystems threatened by disruptions from surface mining. While new federal and state laws require the full reclamation of mine sites, there is no assurance now that reclaimed areas can be self-sustaining, especially in the arid and semiarid West. To these ends, the Ecological Research Division within the Office of Health and Environmental Research of the Department's Office of Environment has begun a number of related programs aimed at understanding more clearly soils, plants, animals, and other components of the ecosystem so that ways may be found to improve environmental quality or to prevent damage from mining. Another aim is to produce efficient and cost-effective techniques for returning to productive use land that has been scarred by mining. Two national laboratories and six universities carry out these research programs. The work extends from broadly based studies, such as the effects of mining on the hydrologic balance, to very specific studies, such as evaluation of the reproductive cycle of a native grass.

  9. BUILDING MATERIALS RECLAMATION PROGRAM

    SciTech Connect

    David C. Weggel; Shen-En Chen; Helene Hilger; Fabien Besnard; Tara Cavalline; Brett Tempest; Adam Alvey; Madeleine Grimmer; Rebecca Turner

    2010-08-31

    This report describes work conducted on the Building Materials Reclamation Program for the period of September 2008 to August 2010. The goals of the project included selecting materials from the local construction and demolition (C&D) waste stream and developing economically viable reprocessing, reuse or recycling schemes to divert them from landfill storage. Educational resources as well as conceptual designs and engineering feasibility demonstrations were provided for various aspects of the work. The project was divided into two distinct phases: Research and Engineering Feasibility and Dissemination. In the Research Phase, a literature review was initiated and data collection commenced, an advisory panel was organized, and research was conducted to evaluate high volume C&D materials for nontraditional use; five materials were selected for more detailed investigations. In the Engineering Feasibility and Dissemination Phase, a conceptual study for a regional (Mecklenburg and surrounding counties) collection and sorting facility was performed, an engineering feasibility project to demonstrate the viability of recycling or reuse schemes was created, the literature review was extended and completed, and pedagogical materials were developed. Over the two-year duration of the project, all of the tasks and subtasks outlined in the original project proposal have been completed. The Final Progress Report, which briefly describes actual project accomplishments versus the tasks/subtasks of the original project proposal, is included in Appendix A of this report. This report describes the scientific/technical aspects (hypotheses, research/testing, and findings) of six subprojects that investigated five common C&D materials. Table 1 summarizes the six subprojects, including the C&D material studied and the graduate student and the faculty advisor on each subproject.

  10. Mining and Reclamation Technology Symposium

    SciTech Connect

    None Available

    1999-06-24

    The Mining and Reclamation Technology Symposium was commissioned by the Mountaintop Removal Mining/Valley Fill Environmental Impact Statement (EIS) Interagency Steering Committee as an educational forum for the members of the regulatory community who will participate in the development of the EIS. The Steering Committee sought a balanced audience to ensure the input to the regulatory community reflected the range of perspectives on this complicated and emotional issue. The focus of this symposium is on mining and reclamation technology alternatives, which is one of eleven topics scheduled for review to support development of the EIS. Others include hydrologic, environmental, ecological, and socio-economic issues.

  11. 31 CFR 240.9 - Reclamation procedures; reclamation protests.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... the Check Claims Web site at http://www.fms.treas.gov/checkclaims or to such other address as Treasury may publish in the Goldbook: The Check Reclamation Guide, which can be found at http://www.fms.treas... debit the financial institution's Master Account, FMS will assess interest, penalties,...

  12. 7 CFR 632.21 - Reclamation plan.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 6 2014-01-01 2014-01-01 false Reclamation plan. 632.21 Section 632.21 Agriculture... AGRICULTURE LONG TERM CONTRACTING RURAL ABANDONED MINE PROGRAM Participation § 632.21 Reclamation plan. (a) Responsibility. Land users are responsible for developing a reclamation plan that will serve as a basis for...

  13. 30 CFR 870.12 - Reclamation fee.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR ABANDONED MINE LAND RECLAMATION ABANDONED MINE RECLAMATION FUND-FEE COLLECTION AND COAL PRODUCTION REPORTING § 870.12..., or use, including the products of in situ mining. (b) The fee shall be determined by the weight...

  14. 30 CFR 870.12 - Reclamation fee.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR ABANDONED MINE LAND RECLAMATION ABANDONED MINE RECLAMATION FUND-FEE COLLECTION AND COAL PRODUCTION REPORTING § 870.12..., or use, including the products of in situ mining. (b) The fee shall be determined by the weight...

  15. RECLAMATION OF ALUMINUM FINISHING SLUDGES

    EPA Science Inventory

    The research study of the reclamation of aluminum-anodizing sludges was conducted in two sequential phases focused on enhanced dewatering of aluminum-anodizing sludges to produce commercial-strength solutions of aluminum sulfate, i.e., liquid alum. The use of high-pressure (14 to...

  16. The True Scholar.

    ERIC Educational Resources Information Center

    Bellah, Robert N.

    2000-01-01

    This essay argues for ethical inquiry as the essence of true scholarship. Individual sections address: pure reason versus ethics, the current "age of money" in the university, rational choice theory, and the fatal flaw in rational choice theory that all human actions cannot be explained by it. (DB)

  17. The ISS Reclamation Data Bank.

    PubMed

    Musmeci, Loredana; Bellino, Mirella; Binetti, Roberto; Ceccarelli, Federica; Costamagna, Francesca Marina; D'Angiolini, Antonella; Fabri, Alessandra; Falleni, Fabrizio; Ferri, Maurizio; Piccardi, Augusta; Roazzi, Paolo; Trucchi, Daniela; Marcello, Ida

    2008-01-01

    Since the issue of the first regulations concerning the remediation of contaminated sites, the Istituto Superiore di Sanità, on the basis of specific requests, has drawn up various technical opinions regarding the proposed reference values (quality standards) for soils and underground waters, to be achieved when remediating contaminated sites, for substances for which no standard limit values did not exist at that time. These reference values, widely used throughout the country and accepted and adopted as "remediation aim" values by various territorial bodies responsible for the approval and monitoring of remediation projects, have been collected in a specific reclamation oriented data bank known as the "Banca Dati Bonifiche (BDB)" (Reclamation Data Bank). The BDB contains the related standardized "rationale" for each reference value, in order to serve as a useful reference for the national bodies concerned with the remediation of contaminated sites. PMID:18469379

  18. TrueImage

    NASA Astrophysics Data System (ADS)

    Kübel, C.; Thust, A.

    The basic principles of focal-series reconstruction in high-resolution TEM are introduced. The paraboloid (PAM) and the maximum-likelihood (MAL) algorithms, which are implemented in TrueImage, are explained. Two application examples are shown to illustrate the benefits of focal-series reconstruction for atomic resolution imaging. Furthermore, a short introduction into linear imaging theory is given as background information.

  19. 7 CFR 632.21 - Reclamation plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... planned land use and treatment is compatible with surrounding land uses and that proposed assistance is... land use compatibility review may be performed by the local reclamation committee. (2) If reclamation... Federal land management agency to insure that the planned land use is compatible with that of...

  20. 30 CFR 816.100 - Contemporaneous reclamation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Contemporaneous reclamation. 816.100 Section 816.100 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PERMANENT PROGRAM PERFORMANCE STANDARDS PERMANENT PROGRAM PERFORMANCE STANDARDS-SURFACE...

  1. 36 CFR 9.11 - Reclamation requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 1 2012-07-01 2012-07-01 false Reclamation requirements. 9.11 Section 9.11 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT Mining and Mining Claims § 9.11 Reclamation requirements. (a) As contemporaneously...

  2. 36 CFR 9.11 - Reclamation requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 1 2014-07-01 2014-07-01 false Reclamation requirements. 9.11 Section 9.11 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT Mining and Mining Claims § 9.11 Reclamation requirements. (a) As contemporaneously...

  3. 36 CFR 9.11 - Reclamation requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Reclamation requirements. 9.11 Section 9.11 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT Mining and Mining Claims § 9.11 Reclamation requirements. (a) As contemporaneously...

  4. 36 CFR 9.11 - Reclamation requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 1 2013-07-01 2013-07-01 false Reclamation requirements. 9.11 Section 9.11 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT Mining and Mining Claims § 9.11 Reclamation requirements. (a) As contemporaneously...

  5. 36 CFR 9.11 - Reclamation requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 1 2011-07-01 2011-07-01 false Reclamation requirements. 9.11 Section 9.11 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT Mining and Mining Claims § 9.11 Reclamation requirements. (a) As contemporaneously...

  6. A True Metasurface Antenna

    PubMed Central

    Badawe, Mohamed El; Almoneef, Thamer S.; Ramahi, Omar M.

    2016-01-01

    We present a true metasurface antenna based on electrically-small resonators. The resonators are placed on a flat surface and connected to one feed point using corporate feed. Unlike conventional array antennas where the distance between adjacent antennas is half wavelength to reduce mutual coupling between adjacent antennas, here the distance between the radiating elements is electrically very small to affect good impedance matching of each resonator to its feed. A metasurface antenna measuring 1.2λ × 1.2λ and designed to operate at 3 GHz achieved a gain of 12 dBi. A prototype was fabricated and tested showing good agreement between numerical simulations and experimental results. Through numerical simulation, we show that the metasurface antenna has the ability to provide beam steering by phasing all the resonators appropriately. PMID:26759177

  7. True Colors Shining Through

    NASA Technical Reports Server (NTRS)

    2004-01-01

    This image mosaic illustrates how scientists use the color calibration targets (upper left) located on both Mars Exploration Rovers to fine-tune the rovers' sense of color. In the center, spectra, or light signatures, acquired in the laboratory of the colored chips on the targets are shown as lines. Actual data from Mars Exploration Rover Spirit's panoramic camera is mapped on top of these lines as dots. The plot demonstrates that the observed colors of Mars match the colors of the chips, and thus approximate the red planet's true colors. This finding is further corroborated by the picture taken on Mars of the calibration target, which shows the colored chips as they would appear on Earth.

  8. A True Metasurface Antenna.

    PubMed

    El Badawe, Mohamed; Almoneef, Thamer S; Ramahi, Omar M

    2016-01-01

    We present a true metasurface antenna based on electrically-small resonators. The resonators are placed on a flat surface and connected to one feed point using corporate feed. Unlike conventional array antennas where the distance between adjacent antennas is half wavelength to reduce mutual coupling between adjacent antennas, here the distance between the radiating elements is electrically very small to affect good impedance matching of each resonator to its feed. A metasurface antenna measuring 1.2λ × 1.2λ and designed to operate at 3 GHz achieved a gain of 12 dBi. A prototype was fabricated and tested showing good agreement between numerical simulations and experimental results. Through numerical simulation, we show that the metasurface antenna has the ability to provide beam steering by phasing all the resonators appropriately. PMID:26759177

  9. A True Metasurface Antenna

    NASA Astrophysics Data System (ADS)

    Badawe, Mohamed El; Almoneef, Thamer S.; Ramahi, Omar M.

    2016-01-01

    We present a true metasurface antenna based on electrically-small resonators. The resonators are placed on a flat surface and connected to one feed point using corporate feed. Unlike conventional array antennas where the distance between adjacent antennas is half wavelength to reduce mutual coupling between adjacent antennas, here the distance between the radiating elements is electrically very small to affect good impedance matching of each resonator to its feed. A metasurface antenna measuring 1.2λ × 1.2λ and designed to operate at 3 GHz achieved a gain of 12 dBi. A prototype was fabricated and tested showing good agreement between numerical simulations and experimental results. Through numerical simulation, we show that the metasurface antenna has the ability to provide beam steering by phasing all the resonators appropriately.

  10. 43 CFR 423.30 - Weapons, firearms, explosives, and fireworks.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Weapons, firearms, explosives, and... WATERBODIES Rules of Conduct § 423.30 Weapons, firearms, explosives, and fireworks. (a) You may possess... exceptions: (1) You must not have a weapon in your possession when at or in a Reclamation facility. (2)...

  11. 43 CFR 23.8 - Approval of mining plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Approval of mining plan. 23.8 Section 23.8 Public Lands: Interior Office of the Secretary of the Interior SURFACE EXPLORATION, MINING AND RECLAMATION OF LANDS § 23.8 Approval of mining plan. (a) Before surface mining operations may commence...

  12. 43 CFR 402.9 - Contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Contracts. 402.9 Section 402.9 Public Lands... LANDS IN FEDERAL RECLAMATION PROJECTS Public Lands § 402.9 Contracts. A contract in form approved by the... by the Commissioner. A copy of the contract shall be furnished to the appropriate land office of...

  13. 43 CFR 404.58 - Do rural water projects authorized before the enactment of the Rural Water Supply Act of 2006...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Do rural water projects authorized before the enactment of the Rural Water Supply Act of 2006 have to comply with the requirements in this rule? 404.58 Section 404.58 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR...

  14. 43 CFR 418.22 - Future adjustments to Lahontan Reservoir storage targets.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Future adjustments to Lahontan Reservoir... RECLAMATION PROJECT, NEVADA Operations and Management § 418.22 Future adjustments to Lahontan Reservoir storage targets. (a) The Lahontan Reservoir storage targets must be adjusted to accommodate changes...

  15. 43 CFR 428.9 - Farm operators who are former owners of excess land.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Farm operators who are former owners of... RECLAMATION, DEPARTMENT OF THE INTERIOR INFORMATION REQUIREMENTS FOR CERTAIN FARM OPERATIONS IN EXCESS OF 960 ACRES AND THE ELIGIBILITY OF CERTAIN FORMERLY EXCESS LAND § 428.9 Farm operators who are former...

  16. 43 CFR 426.8 - Nonresident aliens and foreign entities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Nonresident aliens and foreign entities..., DEPARTMENT OF THE INTERIOR ACREAGE LIMITATION RULES AND REGULATIONS § 426.8 Nonresident aliens and foreign... reclamation law or these regulations, a nonresident alien or foreign entity that directly holds land in...

  17. 43 CFR 413.4 - Assessment of other project act lands and rights of way.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Assessment of other project act lands and rights of way. 413.4 Section 413.4 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR ASSESSMENT BY IRRIGATION DISTRICTS OF LANDS OWNED BY THE UNITED...

  18. 43 CFR 413.5 - Reports on status of settlement lands.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Reports on status of settlement lands. 413.5 Section 413.5 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR ASSESSMENT BY IRRIGATION DISTRICTS OF LANDS OWNED BY THE UNITED STATES,...

  19. 43 CFR 418.7 - Who may receive irrigation deliveries.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Who may receive irrigation deliveries. 418.7 Section 418.7 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION... Conditions of Water Delivery § 418.7 Who may receive irrigation deliveries. Project irrigation...

  20. 43 CFR 417.6 - General regulations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true General regulations. 417.6 Section 417.6 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR PROCEDURAL METHODS FOR IMPLEMENTING COLORADO RIVER WATER CONSERVATION MEASURES WITH LOWER...

  1. 43 CFR 418.12 - Project efficiency.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Project efficiency. 418.12 Section 418.12... INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Conditions of Water Delivery § 418.12 Project efficiency. (a) The principal feature of this part is to obtain a...

  2. 43 CFR 420.3 - Adjacent lands.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Adjacent lands. 420.3 Section 420.3 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR...-managing agencies on adjacent lands (both public and private)....

  3. 43 CFR 418.31 - Conservation measures.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Conservation measures. 418.31 Section 418... THE INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Water Management and Conservation § 418.31 Conservation measures. (a) Specific conservation actions will be...

  4. 43 CFR 431.6 - Power generation estimates.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Power generation estimates. 431.6 Section... THE INTERIOR GENERAL REGULATIONS FOR POWER GENERATION, OPERATION, MAINTENANCE, AND REPLACEMENT AT THE BOULDER CANYON PROJECT, ARIZONA/NEVADA § 431.6 Power generation estimates. Reclamation shall...

  5. 43 CFR 404.10 - Are there certain types of infrastructure and facilities that may not be included in a rural...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Are there certain types of infrastructure... RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.10 Are there certain types of infrastructure and... not include: (a) Any infrastructure or facilities that would deliver water for commercial...

  6. 43 CFR 402.10 - Patent.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Patent. 402.10 Section 402.10 Public Lands... LANDS IN FEDERAL RECLAMATION PROJECTS Public Lands § 402.10 Patent. When a purchaser has complied fully... and patent and shall state the statutory authority for such liens. The receipt shall be submitted...

  7. 43 CFR 423.35 - Animals.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Animals. 423.35 Section 423.35 Public Lands... CONDUCT ON BUREAU OF RECLAMATION FACILITIES, LANDS, AND WATERBODIES Rules of Conduct § 423.35 Animals. (a) You must not bring pets or other animals into public buildings, public transportation vehicles,...

  8. 43 CFR 423.43 - Alcoholic beverages.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Alcoholic beverages. 423.43 Section 423.43 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE....43 Alcoholic beverages. You must not possess or consume alcoholic beverages in violation of...

  9. 43 CFR 426.23 - Recovery of operation and maintenance (O&M) costs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Recovery of operation and maintenance (O&M... RECLAMATION, DEPARTMENT OF THE INTERIOR ACREAGE LIMITATION RULES AND REGULATIONS § 426.23 Recovery of... received irrigation water to the total amount of land in the district that received irrigation water;...

  10. 43 CFR 418.23 - Diversion of Rock Dam Ditch water.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Diversion of Rock Dam Ditch water. 418.23..., DEPARTMENT OF THE INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Operations and Management § 418.23 Diversion of Rock Dam Ditch water. Project water may be diverted...

  11. 43 CFR 423.21 - Responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Responsibilities. 423.21 Section 423.21 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE....21 Responsibilities. (a) You are responsible for finding, being aware of, and obeying all...

  12. Reclamation planning for oil and gas fields

    SciTech Connect

    Lahti, T.

    1990-12-31

    Oil and gas activity began in Rocky Mountain Region during the early 1900`s. Many of the early fields are still producing today. During the initial development of these older fields, little emphasis was placed upon environmental protection activities and reclamation of disturbed areas. Today, many of the {open_quotes}older fields{close_quotes} continue to change without a plan for environmental protection and reclamation. Reclamation of producing fields should begin immediately after a well site is equipped for production. Disturbed areas, no longer needed for operations, should be recontoured and revegetated to stabilize the site and reduce erosion. The Wyoming Bureau of Land Management (BLM) has developed a planning process for use by petroleum industry representatives, in conjunction with the BLM, whenever they are proposing expansion of new fields or planning the reclamation of existing disturbances. The procedures contained in this planning process can help resolve conflicts while guiding operators as they develop reasonable measures to mitigate the impacts of oil and gas development and production. The oil and gas operators, working with the BLM, or other land management entities, should establish a planned priority schedule for completing necessary maintenance and reclamation-related field work. This plan will help the operator budget his resources and work with the land manager to meet present and future responsibilities for environmental protection, reclamation, and final abandonment. Development and implementation of a field reclamation plan encourages the operator to condition a field for reclamation prior to final abandonment. The primary objective of this paper is to describe a procedure for the development of oil and gas field reclamation plans. This procedure establishes guidelines for reclamation planning of existing oil and gas fields on the Bureau of Land Management administered public lands in Wyoming.

  13. Diabetes: What's True and False?

    MedlinePlus

    ... Sledding, Skiing, Snowboarding, Skating Crushes What's a Booger? Diabetes: What's True and False? KidsHealth > For Kids > Diabetes: ... True or False: Eating Too Much Sugar Causes Diabetes False: When kids get type 1 diabetes , it's ...

  14. Town of Edinburg landfill reclamation demonstration project

    SciTech Connect

    Not Available

    1992-05-15

    Landfill reclamation is the process of excavating a solid waste landfill to recover materials, reduce environmental impacts, restore the land resource, and, in some cases, extend landfill life. Using conventional surface mining techniques and specialized separation equipment, a landfill may be separated into recyclable material, combustible material, a soil/compost fraction and residual waste. A landfill reclamation demonstration project was hosted at the Town of Edinburg municipal landfill in northwest Saratoga County. The report examines various separation techniques employed at the site and appropriate uses for reclaimed materials. Specifications regarding engineered work plans, health and safety monitoring, and contingency preparedness are discussed. Major potential applications and benefits of using landfill reclamation technology at existing landfills are identified and discussed. The research and development aspect of the report also examines optimal screening technologies, site selection protocol and the results of a test burn of reclaimed waste at a waste-to-energy facility. Landfill reclamation costs are developed, and economic comparisons are made between reclamation costs and conventional landfill closure costs, with key criteria identified. The results indicate that, although dependent on site-specific conditions and economic factors, landfill reclamation can be a technically and economically feasible alternative or companion to conventional landfill closure under a range of favorable conditions. Feasibility can be determined only after an investigation of the variety of landfill conditions and reclamation options.

  15. Membrane bioreactors for water reclamation.

    PubMed

    Tao, G; Kekre, K; Wei, Z; Lee, T C; Viswanath, B; Seah, H

    2005-01-01

    Singapore has been using dual membrane technology (MF/UF RO) to produce high-grade water (NEWater) from secondary treated sewage. Membrane bioreactor (MBR) has very high potential and will lead to the further improvement of the productivity and quality of high-grade water. This study was focused on the technical feasibility of MBR system for water reclamation in Singapore, making a comparison between various membrane systems available and to get operational experience in terms of membrane cleaning and other issues. Three MBR plants were built at Bedok Water Reclamation Plant with a design flow of 300 m3/day each. They were commissioned in March 2003. Three different types of submerged membranes were tested. They are Membrane A, plate sheet membrane with pore size of 0.4 microm; Membrane B, hollow fibre membrane with pore size of 0.4 microm; and Membrane C, hollow fibre membrane with pore size of 0.035 microm. The permeate quality of all the three MBR Systems were found equivalent to or better than that of the conventional tertiary treatment by ultrafiltration. MBR permeate TOC was about 2 mg/l lower than UF permeate TOC. GC-MS, GC-ECD and HPLC scan results show that trace organic contaminants in MBR permeate and UF permeate were in the same range. MBR power consumption can be less than 1 kwh/m3. Gel layer or dynamic membrane generated on the submerged membrane surface played an important role for the lower MBR permeate TOC than the supernatant TOC in the membrane tank. Intensive chemical cleaning can temporarily remove this layer. During normal operation conditions, the formation of dynamic membrane may need one day to obtain the steady low TOC levels in MBR permeate. PMID:16004005

  16. Development assessment of wash water reclamation

    NASA Technical Reports Server (NTRS)

    Putnam, D. F.

    1976-01-01

    An analytical study assessment of state-of-the-art wash water reclamation technology is presented. It covers all non-phase-change unit operations, unit processes and subsystems currently under development by NASA. Each approach to wash water reclamation is described in detail. Performance data are given together with the projected weights and sizes of key components and subsystems. It is concluded that a simple multifiltration subsystem composed of surface-type cartridge filters, carbon adsorption and ion exchange resins is the most attractive approach for spacecraft wash water reclamation in earth orbital missions of up to 10 years in duration.

  17. 43 CFR 3601.40 - Mining and reclamation plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Mining and reclamation plans. 3601.40... Materials Disposal; General Provisions Mining and Reclamation Plans § 3601.40 Mining and reclamation plans. BLM may require you to submit mining and reclamation plans before we begin any environmental review...

  18. 43 CFR 3601.40 - Mining and reclamation plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Mining and reclamation plans. 3601.40... Materials Disposal; General Provisions Mining and Reclamation Plans § 3601.40 Mining and reclamation plans. BLM may require you to submit mining and reclamation plans before we begin any environmental review...

  19. 43 CFR 3601.40 - Mining and reclamation plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Mining and reclamation plans. 3601.40... Materials Disposal; General Provisions Mining and Reclamation Plans § 3601.40 Mining and reclamation plans. BLM may require you to submit mining and reclamation plans before we begin any environmental review...

  20. 43 CFR 422.3 - Reclamation law enforcement policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Reclamation law enforcement policy. 422.3..., DEPARTMENT OF THE INTERIOR LAW ENFORCEMENT AUTHORITY AT BUREAU OF RECLAMATION PROJECTS § 422.3 Reclamation law enforcement policy. The law enforcement policy of Reclamation is: (a) To maintain an...

  1. A true case story

    PubMed Central

    Walker, Hanne Bjørg

    2012-01-01

    Autism is not generally recognized as a condition which can be bio-medically influenced. As of today, there are no biomarkers for autism that are recognized by traditional medicine. Treating autism medically is a difficult and hopeless task according to official guidelines (even though it is seldom written in official documents). Parents of many children who have or had an ASD diagnosis have witnessed significant improvements in their children after dietary interventions as well as after interventions with vitamins, minerals and biogene substances which can be bought over the counter. The parents of individual children are their best observers. With a high degree of certainty, they are able to see which substances improve or weaken their children. Their observations are usually accurate, but their rationale for why is often wrong. Observations from parents can often be of greater importance for the child than advice from so called experts. This is a true story about a girl whose parents lost contact with her when she was only 6 months old. In her first 14 days she lost her ability to roll over, to babble and make sounds. She did not look at her parents any more – just stared up at the roof. At 9 months she did not respond to words such as, ‘look at mommy’. Through the parents own experiences with her older siblings and 4 months of frantic searching for a diet that would agree with the child, she made a remarkable journey from 10 months of age to 18 months. There is one thing worth mentioning – she refused to eat solid food throughout this time. The story does not end there. Today she is 12 years old and has had to be regulated with diet and biogene substances every day since she was 4 years old. During the last 5 months she has shown more stability and can even go a day or two without biogene substances as long as she keeps to her dietary plan. If you had just met her and spent a day with her, you would never know. PMID:23990822

  2. Geotechnical considerations in surface mine reclamation

    SciTech Connect

    Kuhn, A.K.

    1999-07-01

    Most attention in surface mine reclamation is given to agronomic soils and revegetation, but reclamation success depends on the geotechnical characteristics of the underlying earth. If the soil and rock that underline the surface are not stable, surface treatments lack the dependable foundation needed for them to succeed. Reclamation practioners need to understand those geotechnical considerations--material properties, structure, and processes--that affect stability. properties of rock and soil are altered by mining, and those altered materials together with water and processing waste form often-complex mixtures of materials that must be stabilized in reclamation. Surface mining alters existing landforms and creates new ones such as pit walls, spoil and waste rock piles, tailings impoundments, and earthfills. those structures need to be constructed or stabilized so that they can endure and support successful reclamation. processes that affect material properties and landforms include mechanical breakage, accelerated weathering, erosion, and mass movements. Mechanical breakage and the resulting accelerated weathering combine to change material properties, usually expressed as degraded strength, that can lead to instability of landforms. Erosion, especially that related to extreme storm events, and mass movements in the form of slop failures are the most problematic processes that must be taken into account in reclaiming mined lands. These geotechnical considerations are essential in successful reclamation, and practioners who overlook them may find their work literally sliding down a slippery slope.

  3. Wetland reclamation by accelerating succession

    SciTech Connect

    Rushton, B.T.

    1988-01-01

    This research analyzed mechanisms and processes for accelerating natural succession in order to restore soils and forests on clay setting areas left from phosphate mining in central Florida. Field measurements of succession on unreclaimed clay ponds showed wet sites dominated by dense stands of small shrubby willows even after 60 years with succession arrested because of a shortage of seeds for later stage trees. For drier sites an orderly procession of pioneer wetland trees colonized when wetland seed sources were within 20 meters. The first woody species were willows, myrtles, and baccharis followed in 5 to 10 years by red maple and elm. Oaks colonized slightly drier elevations. Hackberry, cherry, and sweetgum were also found. Experiments in which 3000 seedlings of 11 species were planted in six clay settling areas demonstrated succession can be accelerated. After the first growing season, results suggest that mixed swamp vegetation typical of floodplains may be the most suitable forested wetland community for settling pond reclamation. Percent survival was best for Carolina ash, American elm, and red maple. Some alluvial floodplain species were intermediate in success with 74% survival for baldcypress, 61% for sweetgum, and 61% for laurel oak. Trees from bayheads had the least survival with 52% for swampbay and 41% for loblolly bay. Poorest survival for all species planted (39%) was swamp tupelo. Floodplain species which required fairly dry conditions had poor survival, i.e., southern magnolia (53%) and cabbage palm (43%). Planted tree seedlings were more cost effective than placing seeds on the ground and covering them with litter. A simulation model with hydrologic regimes and outside seeding was used to summarize the operation of the successional system. Simulation that suggested trends for a longer time period than those observed in the field trials are yet to be confirmed.

  4. Reclamation report, Basalt Waste Isolation Project, boreholes 1990

    SciTech Connect

    Brandt, C.A.; Rickard, W.H. Jr.; Cadoret, N.A.

    1991-01-01

    The restoration of areas disturbed activities of the Basalt Waste Isolation Project (BWIP) has been undertaken by the US Department of Energy (DOE) in fulfillment of obligations and commitments made under the National Environmental Policy Act and the Nuclear Waste Policy Act. This restoration program comprises three separate projects: borehole reclamation, Near Surface Test Facility reclamation, and Exploratory Shaft Facility reclamation. Detailed descriptions of these reclamation projects may be found in a number of previous reports. This report describes the second phase of the reclamation program for the BWIP boreholes and analyzes its success relative to the reclamation objective. 6 refs., 14 figs., 13 tabs.

  5. 75 FR 67993 - Hydropower Resource Assessment at Existing Reclamation Facilities-Draft Report

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-04

    ... Bureau of Reclamation Hydropower Resource Assessment at Existing Reclamation Facilities--Draft Report... Bureau of Reclamation has made available for public review and comment the ``Hydropower Resource... and technical potential for hydropower development at existing Bureau of Reclamation...

  6. Landfill reclamation attracts attention and questions

    SciTech Connect

    Aquino, J.T.

    1994-12-01

    Landfill mining or reclamation has fit neatly into the recycling/reuse mindset. In heralding the first California landfill reclamation project at the Caspar Landfill municipal solid waste (MSW) site in May 1994, a California state official described it as ''win-win. Nobody loses''. Speaking at a session at the annual meeting of the Solid Waste Management Association of North America (SWANA), held August 2--6, 1994, Joanne R. Guerriero, senior project engineer, Malcolm Pirnie, Inc. (White Plains, NY), said landfill reclamation--the excavation of a landfill using conventional mining technology to recover and reuse resources--can: extend the life of existing landfill sites and reduce the need for siting new landfills; decrease the area requiring closure; remediate an environmental concern by removing a contaminant source; reclaim marketable recyclables; and capture energy through waste combustion.

  7. Diabetes: What's True and False?

    MedlinePlus

    ... How Can I Help a Friend Who Cuts? Diabetes: What's True and False? KidsHealth > For Teens > Diabetes: ... which are false. Eating too much sugar causes diabetes. False: Type 1 diabetes happens when the cells ...

  8. A True Training Needs Analysis.

    ERIC Educational Resources Information Center

    Nowack, Kenneth M.

    1991-01-01

    Employees often want training in areas that are irrelevant to their jobs or inconsistent with organizational objectives. A well-designed questionnaire can weed out training wants to uncover an employee's true training needs. (Author)

  9. Innovative approaches to mined land reclamation

    SciTech Connect

    Carlson, C.L.; Swisher, J.H.

    1987-01-01

    This is the proceedings of a conference held on mined land reclamation. The thrust of the meeting was coal-related, although applications provided in this conference are relevant to other noncoal mining programs. The main topics were on methods to forecast acid-forming materials to preclude acid mine drainage; methods to correct acid main drainage after formation; soil conservation and reconstruction; uses of waste materials in land reclamation; and methods of insuring vegetation survival on mined lands. Many papers are presented with regards to the regulatory aspects of these areas.

  10. 43 CFR 426.17 - Small reclamation projects.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Small reclamation projects. 426.17 Section... OF THE INTERIOR ACREAGE LIMITATION RULES AND REGULATIONS § 426.17 Small reclamation projects. (a) Effect of the RRA on loan contracts made under the Small Reclamation Projects Act. (1) If a...

  11. 30 CFR 780.23 - Reclamation plan: Land use information.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Reclamation plan: Land use information. 780.23 Section 780.23 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS SURFACE MINING...

  12. 30 CFR 784.15 - Reclamation plan: Land use information.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Reclamation plan: Land use information. 784.15 Section 784.15 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS UNDERGROUND MINING...

  13. Our Reclamation Future: The Missing Bet on Trees.

    ERIC Educational Resources Information Center

    Ashby, W. Clark; And Others

    This document discusses reclamation alternatives for land that has been surface-mined. Special attention is given to the use of tree planting as a desirable reclamation method. Contents include Illinoian reclamation history, knowledge of forestry techniques and successes on surface-mined lands, recreational and educational use of the reclaimed…

  14. 30 CFR 870.15 - Reclamation fee payment.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR ABANDONED MINE LAND RECLAMATION ABANDONED MINE RECLAMATION FUND-FEE COLLECTION AND COAL PRODUCTION REPORTING...) The name and address of any person or entity who purchases 10 percent or more of the production from...

  15. 30 CFR 780.18 - Reclamation plan: General requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Reclamation plan: General requirements. 780.18 Section 780.18 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS SURFACE MINING...

  16. 30 CFR 784.13 - Reclamation plan: General requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Reclamation plan: General requirements. 784.13 Section 784.13 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS UNDERGROUND MINING...

  17. Mine land reclamation and eco-reconstruction in Shanxi province I: mine land reclamation model.

    PubMed

    Bing-yuan, Hao; Li-xun, Kang

    2014-01-01

    Coal resource is the main primary energy in our country, while Shanxi Province is the most important province in resource. Therefore Shanxi is an energy base for our country and has a great significance in energy strategy. However because of the heavy development of the coal resource, the ecological environment is worsening and the farmland is reducing continuously in Shanxi Province. How to resolve the contradiction between coal resource exploitation and environmental protection has become the imperative. Thus the concept of "green mining industry" is arousing more and more attention. In this assay, we will talk about the basic mode of land reclamation in mine area, the engineering study of mine land reclamation, the comprehensive model study of mine land reclamation, and the design and model of ecological agricultural reclamation in mining subsidence. PMID:25050398

  18. Mine Land Reclamation and Eco-Reconstruction in Shanxi Province I: Mine Land Reclamation Model

    PubMed Central

    Bing-yuan, Hao; Li-xun, Kang

    2014-01-01

    Coal resource is the main primary energy in our country, while Shanxi Province is the most important province in resource. Therefore Shanxi is an energy base for our country and has a great significance in energy strategy. However because of the heavy development of the coal resource, the ecological environment is worsening and the farmland is reducing continuously in Shanxi Province. How to resolve the contradiction between coal resource exploitation and environmental protection has become the imperative. Thus the concept of “green mining industry” is arousing more and more attention. In this assay, we will talk about the basic mode of land reclamation in mine area, the engineering study of mine land reclamation, the comprehensive model study of mine land reclamation, and the design and model of ecological agricultural reclamation in mining subsidence. PMID:25050398

  19. Land Reclamation Program annual report, 1979

    SciTech Connect

    1980-09-01

    The Argonne Land Reclamation Program, sponsored by the United States Department of Energy's Assistant Secretary for Environment, is a joint effort of two Argonne divisions: Energy and Environmental Systems and Environmental Impact Studies. The program is carried out by a multidisciplinary team of scientists and engineers and has three primary objectives: (1) to develop energy-efficient and cost-effective mining and reclamation techniques; (2) to assist industry in evaluating the viability of environmental regulations and demonstrating techniques to meet these regulations; and (3) to supply data and evaluation techniques to decisionmakers concerned with trade-offs between energy development and environmental quality. Six integrated field research sites have been established to address problems associated with surface mining operations. This program relies heavily on input from industry and has developed working arrangements with coal companies at each of the current mining sites. A major area of interest is the development of a ten-year environmental mining and reclamation research plan for the Assistant Secretary for Environment. The Land Reclamation Program assigns the highest priority to the transfer to users of information generated by its research.

  20. 43 CFR 3931.20 - Reclamation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Reclamation. 3931.20 Section 3931.20 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT..., subsidence holes, surface excavations, or workings which are a hazard to people or animals. These...

  1. 43 CFR 3931.20 - Reclamation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Reclamation. 3931.20 Section 3931.20 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT..., subsidence holes, surface excavations, or workings which are a hazard to people or animals. These...

  2. 43 CFR 3931.20 - Reclamation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Reclamation. 3931.20 Section 3931.20 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT..., subsidence holes, surface excavations, or workings which are a hazard to people or animals. These...

  3. Land reclamation: Advances in research technology

    SciTech Connect

    Younos, T.; Diplas, P.; Mostaghimi, S.

    1992-01-01

    Land reclamation encompasses remediation of industrial wasteland, improvement of infertile land for agricultural production, preservation of wetlands, and restoration of disturbed areas. Land reclamation is an integral part of sustainable development which aims to reconcile economic productivity with environmental preservation. During the 1980s, significant progress was achieved in the application of advanced technologies to sustainable development projects. The goal of this international symposium was to serve as a forum to review current research and state-of-the-art technology dealing with various aspects of land reclamation, and provide an opportunity for professional interaction and exchange of information in a multi-disciplinary setting. The scope of the symposium was as broad as the topic itself. The keynote address by Professor John Cairns focused on a systems approach in land restoration projects and challenges facing scientists in global biotic impoverishment. Other topics discussed in ten mechanical sessions included development and applications of computer models, geographic information systems, remote sensing technology, salinity problems, surface and ground water monitoring, reclamation of mine areas, soil amendment methods and impacts, wetland restoration techniques, and land use planning for resource protection.

  4. RECLAMATION EFFORTS AT THE LOCKWOOD LANDFILL STATION

    Technology Transfer Automated Retrieval System (TEKTRAN)

    The reclamation of disturbed arid rangelands is a monumental task under the best of conditions. The Lockwood Landfill located 17 km east of Reno, Nevada is a Regional Landfill of some 8800 ha in area. This landfill services all of northern Nevada as well as much of northern California. Returning la...

  5. Basalt Waste Isolation Project Reclamation Support Project:

    SciTech Connect

    Brandt, C.A.; Rickard, W.H. Jr.; Cadoret, N.A.

    1992-06-01

    The Basalt Waste Isolation Project (BWIP) Reclamation Support Project began in the spring of 1988 by categorizing sites distributed during operations of the BWIP into those requiring revegetation and those to be abandoned or transferred to other programs. The Pacific Northwest Laboratory's role in this project was to develop plans for reestablishing native vegetation on the first category of sites, to monitor the implementation of these plans, to evaluate the effectiveness of these efforts, and to identify remediation methods where necessary. The Reclamation Support Project focused on three major areas: geologic hydrologic boreholes, the Exploratory Shaft Facility (ESF), and the Near-Surface Test Facility (NSTF). A number of BWIP reclamation sites seeded between 1989 and 1990 were found to be far below reclamation objectives. These sites were remediated in 1991 using various seedbed treatments designed to rectify problems with water-holding capacity, herbicide activity, surficial crust formation, and nutrient imbalances. Remediation was conducted during November and early December 1991. Sites were examined on a monthly basis thereafter to evaluate plant growth responses to these treatments. At all remediation sites early plant growth responses to these treatments. At all remediation sites, early plant growth far exceeded any previously obtained using other methods and seedbed treatments. Seeded plants did best where amendments consisted of soil-plus-compost or fertilizer-only. Vegetation growth on Gable Mountain was less than that found on other areas nearby, but this difference is attributed primarily to the site's altitude and north-facing orientation.

  6. 36 CFR 9.39 - Reclamation requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 1 2013-07-01 2013-07-01 false Reclamation requirements. 9.39 Section 9.39 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR...) Plugging and capping all nonproductive wells and filling dump holes, ditches, reserve pits and...

  7. 36 CFR 9.39 - Reclamation requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 1 2011-07-01 2011-07-01 false Reclamation requirements. 9.39 Section 9.39 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR...) Plugging and capping all nonproductive wells and filling dump holes, ditches, reserve pits and...

  8. 36 CFR 9.39 - Reclamation requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 1 2014-07-01 2014-07-01 false Reclamation requirements. 9.39 Section 9.39 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR...) Plugging and capping all nonproductive wells and filling dump holes, ditches, reserve pits and...

  9. 36 CFR 292.69 - Concurrent reclamation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Concurrent reclamation. 292.69 Section 292.69 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE NATIONAL RECREATION AREAS Smith River National Recreation Area Other Provisions § 292.69...

  10. 36 CFR 292.69 - Concurrent reclamation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Concurrent reclamation. 292.69 Section 292.69 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE NATIONAL RECREATION AREAS Smith River National Recreation Area Other Provisions § 292.69...

  11. 36 CFR 292.69 - Concurrent reclamation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false Concurrent reclamation. 292.69 Section 292.69 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE NATIONAL RECREATION AREAS Smith River National Recreation Area Other Provisions § 292.69...

  12. 36 CFR 292.69 - Concurrent reclamation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Concurrent reclamation. 292.69 Section 292.69 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE NATIONAL RECREATION AREAS Smith River National Recreation Area Other Provisions § 292.69...

  13. 36 CFR 292.69 - Concurrent reclamation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Concurrent reclamation. 292.69 Section 292.69 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE NATIONAL RECREATION AREAS Smith River National Recreation Area Other Provisions § 292.69...

  14. True aneurysm of brachial artery.

    PubMed

    Hudorović, Narcis; Lovričević, Ivo; Franjić, Dario Bjorn; Brkić, Petar; Tomas, Davor

    2010-10-01

    True upper extremity peripheral artery aneurysms are a rarely encountered arterial disorder. Following computer-tomography angiographic (CT-a) imaging examination, true saccular aneurysm, originating from the left brachial artery was diagnosed in the 77-year-old female without history of trauma. The aneurysm was resected by surgical intervention, and primary repair of the brachial artery was performed by interposition of a part of great saphenous vein harvested from the left groin and creation of two end-to-end anastomoses between interposition graft and previously resected part of brachial artery. No complication was observed during the follow-up. Surgical intervention for upper extremity aneurysms should be initiated without delay. Factors combined with minimal morbidity associated with repair suggest that surgical repair should be performed routinely for true upper extremity arterial aneurysms. PMID:20865459

  15. Noncontact true temperature measurement, 2

    NASA Technical Reports Server (NTRS)

    Lee, Mark C.; Allen, James L.

    1988-01-01

    A laser pyrometer was developed for acquiring the true temperature of a levitated sample. The reflectivity is measured by first expanding the laser beam to cover the entire cross-sectional surface of the diffuse target. The reflectivity calibration of this system is determined from the surface emissivity of a target with a blackbody cavity. The emissivity of the real target can then be calculated. The overall system constant is obtained by passively measuring the radiance of the blackbody cavity (emissivity = 1.0) at a known, arbitrary temperature. Since the photosensor used is highly linear over the entire operating temperature range, the true temperature of the target can then be computed. The latest results available from this on-going research indicate that true temperatures thus obtained are in very good quantitative agreement with thermocouple measured temperatures.

  16. Final Reclamation Report: Basalt Waste Isolation Project exploratory shaft site

    SciTech Connect

    Brandt, C.A.; Rickard, W.H. Jr.

    1990-06-01

    The restoration of areas disturbed by activities of the Basalt Waste Isolation Project (BWIP) constitutes a unique operation at the US Department of Energy's (DOE) Hanford Site, both from the standpoint of restoration objectives and the time frame for accomplishing these objectives. The BWIP reclamation program comprises three separate projects: borehole reclamation, Near Surface Test Facility (NSTF) reclamation, and Exploratory Shaft Facility (ESF) reclamation. The main focus of this report is on determining the success of the revegetation effort 1 year after work was completed. This report also provides a brief overview of the ESF reclamation program. 21 refs., 7 figs., 14 tabs.

  17. Multiple True-False Questions

    ERIC Educational Resources Information Center

    Hill, G. C.; Woods, G. T.

    1974-01-01

    Two types of objective questions are compared: the multiple choice item, in which one and only one of several stated alternatives is correct for a given initial statement, and the multiple true-false item, where the stem is followed by several completions of which one or more can be correct. (DT)

  18. Computer simulation of water reclamation processors

    NASA Technical Reports Server (NTRS)

    Fisher, John W.; Hightower, T. M.; Flynn, Michael T.

    1991-01-01

    The development of detailed simulation models of water reclamation processors based on the ASPEN PLUS simulation program is discussed. Individual models have been developed for vapor compression distillation, vapor phase catalytic ammonia removal, and supercritical water oxidation. These models are used for predicting the process behavior. Particular attention is given to methodology which is used to complete this work, and the insights which are gained by this type of model development.

  19. Geomorphology and reclamation of disturbed lands

    SciTech Connect

    Toy, T.J.; Hadley, R.F.

    1987-01-01

    The science of geomorphology concerns the character of the earth's land surface, the forms and processes responsible for its development and evolution. An understanding of geomorphic processes is essential to the comprehension of the consequences of human disturbance on environmental systems and the formulation of effective reclamation programs. Hence, it is the purpose of this book to demonstrate the linkages among geomorphic principles, environmental impacts.

  20. Optimal message log reclamation for independent checkpointing

    NASA Technical Reports Server (NTRS)

    Wang, Yi-Min; Fuchs, W. Kent

    1993-01-01

    Independent (uncoordinated) check pointing for parallel and distributed systems allows maximum process autonomy but suffers from possible domino effects and the associated storage space overhead for maintaining multiple checkpoints and message logs. In most research on check pointing and recovery, it was assumed that only the checkpoints and message logs older than the global recovery line can be discarded. It is shown how recovery line transformation and decomposition can be applied to the problem of efficiently identifying all discardable message logs, thereby achieving optimal garbage collection. Communication trace-driven simulation for several parallel programs is used to show the benefits of the proposed algorithm for message log reclamation.

  1. Biodeterioration of materials in water reclamation systems

    NASA Technical Reports Server (NTRS)

    Ford, Tim; Maki, James S.; Mitchell, Ralph

    1992-01-01

    The chemicals produced by the microbial processes involved in the 'biofilms' which form on the surfaces of manned spacecraft water reclamation systems encompass both metals and organic poisons; both are potential hazards to astronaut health and the growth of the plants envisioned for closed-cycle life support systems. Image analysis is here shown to be a very useful technique for the study of biofilm formation on candidate water-processor materials for Space Station Freedom. The biodeterioration of materials exposed to biofilms can be swiftly evaluated by means of electrochemical impedance spectroscopy.

  2. The human factor in mining reclamation

    USGS Publications Warehouse

    Arbogast, Belinda F.; Knepper, Daniel H.; Langer, William H.

    2000-01-01

    Rapid urbanization of the landscape results in less space available for wildlife habitat, agriculture, and recreation. Mineral resources (especially nonmetallic construction materials) become unrecoverable due to inaccessibility caused by development. This report both describes mine sites with serious problems and draws attention to thoughtful reclamation projects for better future management. It presents information from selected sites in terms of their history, landform, design approach, and visual discernment. Examples from Colorado are included to introduce the broader issue of regions soundly developing mining sites, permitting the best utilization of natural resources, and respecting the landscape.

  3. Mendel had no "true" monohybrids.

    PubMed

    Corcos, A; Monaghan, F

    1984-01-01

    Mendel's experiments in hybridizing peas started in 1856 and ended in 1863. When one attempts to fit the described experiments--in the sequence indicated in the paper--into those limits some serious implications emerge with regard to parental types needed and the scheduling of the experiments. If Mendel had to develop the parental types of his monohybrid and dihybrid crosses and then do the experiments he described, 8 years would not have been a sufficient amount of time. We believe that his original true-breeding varieties differed in more than one trait on the basis of a logical analysis of breeding relationships. It follows first that his "monohybrid" experiments were performed with varieties in several traits but that in each offering he concentrated his attention on only one, second that he had the parental lines for his dihybrid and trihybrid experiments on hand before he started those experiments. PMID:6392411

  4. Cercignani's Conjecture is Sometimes True and Always Almost True

    NASA Astrophysics Data System (ADS)

    Villani, Cédric

    We establish several new functional inequalities comparing Boltzmann's entropy production functional with the relative H functional. First we prove a longstanding conjecture by Cercignani under the nonphysical assumption that the Boltzmann collision kernel is superquadratic at infinity. The proof rests on the method introduced in [39] combined with a novel use of the Blachman-Stam inequality. If the superquadraticity assumption is not satisfied, then it is known that Cercignani's conjecture is not true; however we establish a slightly weakened version of it for all physically relevant collision kernels, thus extending previous results from [39]. Finally, we consider the entropy-entropy production version of Kac's spectral gap problem and obtain estimates about the dependence of the constants with respect to the dimension. The first two results are sharp in some sense, and the third one is likely to be, too; they contain all previously known entropy estimates as particular cases. This gives a first coherent picture of the study of entropy production, according to a program started by Carlen and Carvalho [12] ten years ago. These entropy inequalities are one step in our study of the trend to equilibrium for the Boltzmann equation, in both its spatially homogeneous and spatially inhomogeneous versions.

  5. 30 CFR 925.20 - Approval of the Missouri abandoned mine land reclamation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Reclamation Program, 205 Jefferson Street, Jefferson City, MO 65102. (b) Office of Surface Mining Reclamation and Enforcement, Mid-Continent Regional Coordinating Center, Alton Federal Building, 501 Belle...

  6. 30 CFR 784.15 - Reclamation plan: Land use information.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Reclamation plan: Land use information. 784.15... PLAN § 784.15 Reclamation plan: Land use information. (a) The plan shall contain a statement of the.... If the premining use of the land was changed within 5 years before the anticipated date of...

  7. 30 CFR 780.23 - Reclamation plan: Land use information.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Reclamation plan: Land use information. 780.23... PLAN § 780.23 Reclamation plan: Land use information. (a) The plan shall contain a statement of the.... If the premining use of the land was changed within 5 years before the anticipated date of...

  8. 30 CFR 780.23 - Reclamation plan: Land use information.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Reclamation plan: Land use information. 780.23... PLAN § 780.23 Reclamation plan: Land use information. (a) The plan shall contain a statement of the.... If the premining use of the land was changed within 5 years before the anticipated date of...

  9. 30 CFR 780.23 - Reclamation plan: Land use information.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Reclamation plan: Land use information. 780.23... PLAN § 780.23 Reclamation plan: Land use information. (a) The plan shall contain a statement of the.... If the premining use of the land was changed within 5 years before the anticipated date of...

  10. 30 CFR 780.23 - Reclamation plan: Land use information.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Reclamation plan: Land use information. 780.23... PLAN § 780.23 Reclamation plan: Land use information. (a) The plan shall contain a statement of the.... If the premining use of the land was changed within 5 years before the anticipated date of...

  11. 30 CFR 784.15 - Reclamation plan: Land use information.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Reclamation plan: Land use information. 784.15... PLAN § 784.15 Reclamation plan: Land use information. (a) The plan shall contain a statement of the.... If the premining use of the land was changed within 5 years before the anticipated date of...

  12. 30 CFR 784.15 - Reclamation plan: Land use information.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Reclamation plan: Land use information. 784.15... PLAN § 784.15 Reclamation plan: Land use information. (a) The plan shall contain a statement of the.... If the premining use of the land was changed within 5 years before the anticipated date of...

  13. 30 CFR 784.15 - Reclamation plan: Land use information.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Reclamation plan: Land use information. 784.15... PLAN § 784.15 Reclamation plan: Land use information. (a) The plan shall contain a statement of the.... If the premining use of the land was changed within 5 years before the anticipated date of...

  14. 43 CFR 422.3 - Reclamation law enforcement policy.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Regulations, 43 CFR 2; and 383 DM 15, Freedom of Information Act Handbook (see www.doi.gov); (g) To ensure... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Reclamation law enforcement policy. 422.3..., DEPARTMENT OF THE INTERIOR LAW ENFORCEMENT AUTHORITY AT BUREAU OF RECLAMATION PROJECTS § 422.3...

  15. 43 CFR 422.3 - Reclamation law enforcement policy.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Regulations, 43 CFR 2; and 383 DM 15, Freedom of Information Act Handbook (see www.doi.gov); (g) To ensure... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Reclamation law enforcement policy. 422.3..., DEPARTMENT OF THE INTERIOR LAW ENFORCEMENT AUTHORITY AT BUREAU OF RECLAMATION PROJECTS § 422.3...

  16. Renewable Energy Assessment for the Bureau of Reclamation

    SciTech Connect

    Haase, S.; Burman, K.; Dahle, D.; Heimiller, D.; Van Geet, O.

    2012-05-01

    Report summarizes the results of an assessment and analysis of renewable energy opportunities conducted for the U.S. Department of Interior, Bureau of Reclamation (Reclamation) by the National Renewable Energy Laboratory (NREL). Report contains results from utility scale analysis and site visits, as well as facility scale screening and site visits.

  17. Method of controlling a reclamation furnace

    SciTech Connect

    Mainord, K. R.

    1985-12-10

    This invention relates to an improved method of controlling temperatures within a cleaning or reclamation furnace which is normally used to reclaim metal parts contaminated with combustible materials by pyrolyzing the combustible materials. A reclamation furnace usually includes a primary heat-input burner employed to heat the contaminated parts in the primary heating chamber, an afterburner chamber contained within the heating chamber having a secondary burner to burn volatile gases which are given off by the combustible materials as the parts are heated, and two separately-controlled automatic valve and spray nozzle assemblies connected to the primary heating chamber. Each nozzle assembly is connected to a pressurized water source to deliver a water-spray injection into the heating chamber. First and second temperature sensors are located in the discharge stack leading from the afterburner chamber and in the furnace heating chamber respectively to actuate either one or both of the separately-controlled automatic valve and spray nozzle assemblies responsive to the temperature of the burned stack gases and the furnace interior temperature.

  18. Enhanced Oxidation Catalysts for Water Reclamation

    NASA Technical Reports Server (NTRS)

    Jolly, Clifford D.

    1999-01-01

    This effort seeks to develop and test high-performance, long operating life, physically stable catalysts for use in spacecraft water reclamation systems. The primary goals are to a) reduce the quantity of expendable water filters used to purify water aboard spacecraft, b) to extend the life of the oxidation catalysts used for eliminating organic contaminants in the water reclamation systems, and c) reduce the weight/volume of the catalytic oxidation systems (e.g. VRA) used. This effort is targeted toward later space station utilization and will consist of developing flight-qualifiable catalysts and long-term ground tests of the catalyst prior to their utilization in flight. Fixed -bed catalytic reactors containing 5% platinum on granular activated carbon have been subjected to long-term dynamic column tests to measure catalyst stability vs throughput. The data generated so far indicate that an order of magnitude improvement can be obtained with the treated catalysts vs the control catalyst, at only a minor loss (approx 10%) in the initial catalytic activity.

  19. Optimal control solutions to sodic soil reclamation

    NASA Astrophysics Data System (ADS)

    Mau, Yair; Porporato, Amilcare

    2016-05-01

    We study the reclamation process of a sodic soil by irrigation with water amended with calcium cations. In order to explore the entire range of time-dependent strategies, this task is framed as an optimal control problem, where the amendment rate is the control and the total rehabilitation time is the quantity to be minimized. We use a minimalist model of vertically averaged soil salinity and sodicity, in which the main feedback controlling the dynamics is the nonlinear coupling of soil water and exchange complex, given by the Gapon equation. We show that the optimal solution is a bang-bang control strategy, where the amendment rate is discontinuously switched along the process from a maximum value to zero. The solution enables a reduction in remediation time of about 50%, compared with the continuous use of good-quality irrigation water. Because of its general structure, the bang-bang solution is also shown to work for the reclamation of other soil conditions, such as saline-sodic soils. The novelty in our modeling approach is the capability of searching the entire "strategy space" for optimal time-dependent protocols. The optimal solutions found for the minimalist model can be then fine-tuned by experiments and numerical simulations, applicable to realistic conditions that include spatial variability and heterogeneities.

  20. 43 CFR 23.10 - Reports: Inspection.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Reports: Inspection. 23.10 Section 23.10 Public Lands: Interior Office of the Secretary of the Interior SURFACE EXPLORATION, MINING AND RECLAMATION OF LANDS § 23.10 Reports: Inspection. (a)(1) The holder of a permit or lease under the mineral leasing acts shall file the reports required...

  1. 43 CFR 23.2 - Scope.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Scope. 23.2 Section 23.2 Public Lands: Interior Office of the Secretary of the Interior SURFACE EXPLORATION, MINING AND RECLAMATION OF LANDS § 23.2 Scope. (a) Except as provided in paragraph (b) of this section, the regulations in this part provide for the protection and conservation...

  2. Reclamation, managing water in the West: An exploration of Bureau of Reclamation approaches for managing conflict over diverging science

    USGS Publications Warehouse

    Burkardt, Nina; Ruell, Emily; Clark, Douglas

    2008-01-01

    We report the results of (1) an electronic survey of Reclamation senior managers and (2) a panel discussion amongst Reclamation senior managers as to the current institutional capabilities for managing diverging scientific findings in water dispute resolution processes. We conclude with a discussion of the strengths and weaknesses of the different tools and techniques managers reported in the survey and in the panel discussion.

  3. Mine drainage and surface mine reclamation. Volume II. Mine reclamation, abandoned mine lands and policy issues

    SciTech Connect

    Not Available

    1988-01-01

    Mine waste and mine reclamation are topics of major interest to the mining industry, the government and the general public. This publication and its companion volume are the proceedings of a conference held in Pittsburgh, April 19-21, 1988. There were nine sessions (50 papers) that dealt with the geochemistry, hydrology and problems of mine waste and mine water, especially acid mine drainage. These comprise Volume 1. The nine sessions (43 papers) that dealt with reclamation and restoration of disturbed lands, as well as related policy issues, are included in volume 2. Volume 2 also contains the ten papers that pertained to control of subsidence and mine fires at abandoned mines. Poster session presentations are, in general, represented by abstracts; these have been placed in the back of both volumes.

  4. Mars in True Color (almost)

    NASA Technical Reports Server (NTRS)

    2003-01-01

    [figure removed for brevity, see original site]

    Released 14 November 2003

    This spectacular view of the sunlit cliffs and basaltic sand dunes in southern Melas Chasma shows Mars in a way rarely seen: in full, realistic color. The colorization is the result of a collaboration between THEMIS team members at Cornell University and space artist Don Davis, who is an expert on true-color renderings of planetary and astronomical objects. Davis began with calibrated and co-registered THEMIS VIS multi-band radiance files produced by the Cornell group. Using as a guide true-color imaging from the Hubble Space Telescope and his own personal experience at Mt. Wilson and other observatories, he performed a manual color balance to match more closely the colors of previous visual Mars observations. He also did some manual smoothing and other image processing to minimize the effects of residual scattered light in the images. The result is a view of Mars that invites comparisons to Earth; a scene that one might observe out the window on a flight over the southwest United States, but not quite. The basaltic dunes are commonplace on Mars but a rare feature on Earth. The rounded knobs and elongated mesas on the canyon floor show an erosional style as exotic as Utah's Bryce Canyon but wholly familiar on Mars. Although the inhospitable Martian atmosphere cannot be seen, the magnificent Martian landscape on display in this image beckons space-suited human explorers and the sightseers who will follow.

    Initial image processing and calibration by THEMIS team members J. Bell, T. McConnochie, and D. Savransky at Cornell University; additional processing and final color balance by space artist Don Davis.

    Image information: VIS instrument. Latitude -12.7, Longitude 288.6 East (71.4 West). 19 meter/pixel resolution.

    Note: this THEMIS visual image has not been radiometrically nor geometrically calibrated for this preliminary release. An empirical correction has been performed

  5. 43 CFR 404.52 - Who will the feasibility report be provided to?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Who will the feasibility report be... RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Feasibility Studies § 404.52 Who will the feasibility report be provided to? Upon its completion, Reclamation will: (a) Provide...

  6. 43 CFR 402.3 - Power to sell.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Power to sell. 402.3 Section 402.3 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR SALE OF LANDS IN FEDERAL RECLAMATION PROJECTS Public Lands § 402.3 Power to sell. The Commissioner of Reclamation may, in accordance with...

  7. Reclamation of surface-mine spoil

    SciTech Connect

    Cross, E.A.

    1981-09-01

    Research being performed on land reclamation at the Corona and Kellerman mines in Alabama is reported. Information is presented under the following headings: effects of topsoiling and mulching treatment on plant growth and soil erosion; preliminary findings on the germination and growth of Southern red oak seedlings on calcareous shale surface mine spoil; some effects of vegetation type and fertilization on growth, survival, and tip moth damage in loblolly pine planted on alkaline shale surface mine spoil; some effects of competition and fertilizer on the growth and survival of selected Christmas tree stock and Virginia pine on alkaline shale spoil; growth and survival of Eastern red cedar on alkaline shale spoil; and, greenhouse studies. The appendixes are entitled: study of the effects of acidification of calcareous shale on the growth of weeping love grass; the effects of competition and spoil mixtures on the growth of perennial ryegrass and weeping lovegrass; and, the effects of delayed fertilization on the growth of weeping lovegrass. (JGB)

  8. Control method for a reclamation furnace

    SciTech Connect

    Kelly, S.B.

    1981-06-02

    A method is presented for preventing fires and explosions and thus controlling excess temperature within a burn-off or reclamation furnace including a water injection nozzle within the furnace, an automatic valve assembly connected to a source of water under pressure to turn the water on and off, an input burner to heat contaminate materials, an afterburner to burn volatile gases given off by the contaminate materials as they are heated, a temperature sensor located in the discharge from the afterburner to actuate the automatic valve assembly open and closed responsive to the temperature of the discharge. The temperature of the discharge depends on the rate of emission of volatile gases from the contaminate material so that if a high emission rate causes a predetermined temperature to be exceeded the valve assembly opens and the water injection nozzle sprays water on the contaminate materials to cool them and decrease the emission rate until the valve assembly closes.

  9. AP reclamation and reuse in RSRM propellant

    NASA Technical Reports Server (NTRS)

    Miks, Kathryn F.; Harris, Stacey A.

    1995-01-01

    A solid propellant ingredient reclamation pilot plant has been evaluated at the Strategic Operations of Thiokol Corporation, located in Brigham City, Utah. The plant produces AP wet cake (95 percent AP, 5 percent water) for recycling at AP vendors. AP has been obtained from two standard propellant binder systems (PBAN and HTPB). Analytical work conducted at Thiokol indicates that the vendor-recrystallized AP meets Space Shuttle propellant specification requirements. Thiokol has processed 1-, 5-, and 600-gallon propellant mixes with the recrystallized AP. Processing, cast, cure, ballistic, mechanical, and safety properties have been evaluated. Phillips Laboratory static-test-fired 70-pound and 800-pound BATES motors. The data indicate that propellant processed with reclaimed AP has nominal properties.

  10. Selective removal of organics for water reclamation

    NASA Technical Reports Server (NTRS)

    Murphy, Oliver J.; Hitchens, G. Duncan; Kaba, Lamine; Verostko, Charles E.

    1990-01-01

    Electrooxidation is a means of removing organic solutes directly from waste waters without the use of chemical expendables. The feasibility of the concept for oxidation of organic impurities common to urine, shower waters and space habitat humidity condensates was demonstrated. Electrooxidation of urine and waste water ersatz was experimentally demonstrated. The electrooxidation principle, reaction kinetics, efficiency, power, size, experimental test results and water reclamation applications are described. Process operating potentials and the use of anodic oxidation potentials that are sufficiently low to avoid oxygen formation and chloride oxidation are also described. The design of a novel electrochemical system that incorporates a proton exchange membrane (PEM) electrolyte is presented based on parametric test data and current fuel cell technology.

  11. Habitat diversity change associated with reclamation in Illinois

    SciTech Connect

    Hayes, L.A.; Nawrot, J.R.; Klimstra, W.D.

    1984-12-01

    Surface-mined lands in 4 Illinois regions (Northwest, Southeast, Southcentral, and Southwest) were studied to compare land-use changes before mining and after reclamation in relation to Illinois reclamation laws. Reclamation requirements were designated as pre-law (pre-1962); post-law 1962-1970, 1971-1976, and 1977 and more recent. Two locations per law category were chosen in each region, resulting in 32 site studies. Land-use types were identified and their area calculated from aerial photographs and/or pre- and post-mining land-use maps. Pre-law reclamation was predominantly forest, while post-law reclamation during 1962-1976 was largely pasture. Reclamation for 1977 and more recent exhibited pasture and cropland as major reclamation types. As expected, more land-use types were encountered on pre-mine lands than on post-mine; the latter usually possessed fewer but larger parcels. Diversity decreased in the transition from pre- to post-mine within post-law categories. Pre-law and 1977 and more recent were most diverse; 1962-1970 and 1971-1976 were the least diverse due to the dominance of pasture. Cropland, pasture, and impoundments were the main post-mine habitats. Cropland and pasture were usually in large tracts and lacked diversity. Impoundments were beneficial in providing a water source and increasing diversity.

  12. Town of Edinburg landfill reclamation demonstration project. Final report

    SciTech Connect

    Not Available

    1992-05-15

    Landfill reclamation is the process of excavating a solid waste landfill to recover materials, reduce environmental impacts, restore the land resource, and, in some cases, extend landfill life. Using conventional surface mining techniques and specialized separation equipment, a landfill may be separated into recyclable material, combustible material, a soil/compost fraction and residual waste. A landfill reclamation demonstration project was hosted at the Town of Edinburg municipal landfill in northwest Saratoga County. The report examines various separation techniques employed at the site and appropriate uses for reclaimed materials. Specifications regarding engineered work plans, health and safety monitoring, and contingency preparedness are discussed. Major potential applications and benefits of using landfill reclamation technology at existing landfills are identified and discussed. The research and development aspect of the report also examines optimal screening technologies, site selection protocol and the results of a test burn of reclaimed waste at a waste-to-energy facility. Landfill reclamation costs are developed, and economic comparisons are made between reclamation costs and conventional landfill closure costs, with key criteria identified. The results indicate that, although dependent on site-specific conditions and economic factors, landfill reclamation can be a technically and economically feasible alternative or companion to conventional landfill closure under a range of favorable conditions. Feasibility can be determined only after an investigation of the variety of landfill conditions and reclamation options.

  13. True amplitude prestack depth migration

    NASA Astrophysics Data System (ADS)

    Deng, Feng

    Reliable analysis of amplitude variation with offset (or with angle) requires accurate amplitudes from prestack migration. In routine seismic data processing, amplitude balancing and automatic gain control are often used to reduce amplitude lateral variations. However, these methods are empirical and lack a solid physical basis; thus, there are uncertainties that might produce erroneous conclusions, and hence cause economic loss. During wavefield propagation, geometrical spreading, intrinsic attenuation, transmission losses and the energy conversion significantly distort the wavefield amplitude. Most current true-amplitude migrations usually compensate only for geometrical spreading. A new prestack depth migration based on the framework of reverse-time migration in the time-space domain was developed in this dissertation with the aim of compensating all of the propagation effects in one integrated algorithm. Geometrical spreading is automatically included because of the use of full two-way wave extrapolation. Viscoelastic wave equations are solved to handle the intrinsic attenuation with a priori quality factor. Transmission losses for both up- and down-going waves are compensated using a two-pass, recursive procedure based on extracting the angle-dependent reflection/transmission coefficients from prestack migration. The losses caused by the conversion of energy from one elastic model to another are accounted for through elastic wave extrapolation; the influence of the S wave velocity contrast on the P wave reflection coefficient is implicitly included by using the Zoeppritz equations to describe the reflection and transmission at an elastic interface. Only smooth background models are assumed to be known. The contrasts/ratios of the model parameters can be estimated by fitting the compensated angle-dependent reflection coefficients obtained from data for multiple sources. This is one useful by-product of the algorithm. Numerical tests on both 2D and 3D scalar

  14. 43 CFR 404.3 - What is the Reclamation Rural Water Supply Program?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false What is the Reclamation Rural Water Supply Program? 404.3 Section 404.3 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.3 What is the Reclamation Rural Water Supply...

  15. 43 CFR 404.21 - What is Reclamation's role in preparing the full proposal?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false What is Reclamation's role in preparing the full proposal? 404.21 Section 404.21 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.21 What is Reclamation's role in preparing...

  16. 43 CFR 404.22 - How will Reclamation evaluate my full proposal?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false How will Reclamation evaluate my full proposal? 404.22 Section 404.22 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.22 How will Reclamation evaluate my full proposal?...

  17. 30 CFR 943.20 - Approval of Texas abandoned mine land reclamation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... reclamation plan. 943.20 Section 943.20 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT... § 943.20 Approval of Texas abandoned mine land reclamation plan. The Secretary approved the Texas abandoned mine land reclamation plan, as submitted on April 24, 1980, and amended on May 30, 1980, June...

  18. 30 CFR 924.20 - Approval of Mississippi abandoned mine land reclamation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... reclamation plans. 924.20 Section 924.20 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE MISSISSIPPI § 924.20 Approval of Mississippi abandoned mine land reclamation plans. The Mississippi abandoned mine land reclamation plan as submitted on April 5, 2006, and June 11, 2007, and...

  19. 30 CFR 943.20 - Approval of Texas abandoned mine land reclamation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... reclamation plan. 943.20 Section 943.20 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT... § 943.20 Approval of Texas abandoned mine land reclamation plan. The Secretary approved the Texas abandoned mine land reclamation plan, as submitted on April 24, 1980, and amended on May 30, 1980, June...

  20. 30 CFR 924.20 - Approval of Mississippi abandoned mine land reclamation plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... reclamation plans. 924.20 Section 924.20 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE MISSISSIPPI § 924.20 Approval of Mississippi abandoned mine land reclamation plans. The Mississippi abandoned mine land reclamation plan as submitted on April 5, 2006, and June 11, 2007, and...

  1. 43 CFR 404.3 - What is the Reclamation Rural Water Supply Program?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false What is the Reclamation Rural Water Supply Program? 404.3 Section 404.3 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.3 What is the Reclamation Rural Water Supply...

  2. 43 CFR 404.21 - What is Reclamation's role in preparing the full proposal?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false What is Reclamation's role in preparing the full proposal? 404.21 Section 404.21 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.21 What is Reclamation's role in preparing...

  3. 30 CFR 946.20 - Abandoned mine land reclamation plan approval.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Abandoned mine land reclamation plan approval. 946.20 Section 946.20 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT... § 946.20 Abandoned mine land reclamation plan approval. Virginia Abandoned Mine Land Reclamation Plan...

  4. 30 CFR 870.15 - Reclamation fee payment.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... must submit to us a completed Coal Sales and Reclamation Fee Report (OSM-1 Form). You can file the OSM... transferred the mineral rights, you must include on the OSM-1 Form information on the last owner(s) in...

  5. 30 CFR 870.15 - Reclamation fee payment.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... must submit to us a completed Coal Sales and Reclamation Fee Report (OSM-1 Form). You can file the OSM... transferred the mineral rights, you must include on the OSM-1 Form information on the last owner(s) in...

  6. 30 CFR 870.15 - Reclamation fee payment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... must submit to us a completed Coal Sales and Reclamation Fee Report (OSM-1 Form). You can file the OSM... transferred the mineral rights, you must include on the OSM-1 Form information on the last owner(s) in...

  7. Recent developments in the reclamation of surface mined lands

    USGS Publications Warehouse

    Sharma, K.D.; Gough, L.P.; Kumar, S.; Sharma, B.K.; Saxena, S.K.

    1997-01-01

    A broad review of mine land reclamation problems and challenges in arid lands is presented with special emphasis on work recently completed in India. The economics of mining in the Indian Desert is second only to agriculture in importance. Lands disturbed by mining, however, have only recently been the focus of reclamation attempts. Studies were made and results compiled of problems associated with germplasm selection, soil, plant and overburden characterization and manipulation, plant establishment methods utilized, soil amendment needs, use and conservation of available water and the evaluation of ecosystem sustainability. Emphasis is made of the need for multi-disciplinary approaches to mine land reclamation research and for the long-term monitoring of reclamation success.

  8. PERFORMANCE DEMONSTRATIONS OF ALTERNATIVE SCREEN RECLAMATION PRODUCTS FOR SCREEN PRINTING

    EPA Science Inventory

    This project evaluated environmentally-preferable products for the screen reclamation process In screen printing during month-long demonstrations at 23 printing facilities nationwide. hrough the Environmental Protection Agency (EPA) Design for the Environment Printing Project, pr...

  9. Enhanced cover methods for surface coal refuse reclamation

    SciTech Connect

    Gentile, L.F.; Cargill, K.W.; McGarvie, S.D.

    1997-12-31

    Controlling acid rock drainage (ARD) can be a major component of surface mining reclamation. An enhanced reclamation cover system is being constructed to control infiltration of rain water and generation of ARD from coal-refuse disposal areas at a closed mine in southern Illinois. Development of the mine reclamation plan required consideration of ARD generation in coal refuse disposal areas located adjacent to an alluvial aquifer used for public water supply. An integrated site characterization was performed at the mine to provide information to develop and support the enhanced reclamation plan. The enhanced cover system is similar to covers required for municipal solid waste landfills by the Resource Conversation and Recovery Act (RCRA), Subtitle D regulations. The system comprises a graded and compacted gob layer, overlain by a compacted clay liner, and a protective soil cover. The results of infiltration modeling and analyses showed that the standard reclamation cover is effective in reducing infiltration by about 18 percent compared to an unreclaimed coal-refuse surface. The modeling results showed that the inhanced cover system should reduce infiltration by about 84 percent. The geochemical modeling results showed that the reduction in infiltration would help minimize ARD generation and contribute to an earlier reclamation of the mine site.

  10. Reclamation of tannery polluted soil through phytoremediation.

    PubMed

    Sakthivel, V; Vivekanandan, M

    2009-04-01

    The huge volume of sludge emanating from the tannery effluent treatment plants poses a serious environmental problem. Phytoremediation is an emerging technology in which the plants are employed to reclamate the contaminated soil strewn with heavy metals (metalloids) and toxic compounds. This work focuses the impact of application of tannery sludge on biochemical properties of 6 months old tree saplings of Azadirachta indica A. Juss. (Neem), Melia azedarach Linn. (Wild Neem) and Leucaena leucocephala (Lam) de Wit (Subabool) raised over the tannery sludge in an attempt to use these plants for phytoremediation. The plants raised over the garden soil served as the control. The porosity and water holding capacity of the tannery sludge were higher. The plant growth supporting elements such as Ca, total N2, NO3 and Mg were higher in the sludge. The plants raised over the sludge were found to be dark green with increased morphometric parameters. Electrophoretic profile revealed amplification of a few polypeptides (100, 105, 49 and 55 KDa). The levels of biomolecules and the CO2 absorption increased in 6 months old plants. There was a significant uptake and transport of chromium in all the three tree species suggesting that these plants could be employed in phytoremediation of soils contaminated with heavy metals. PMID:23572927

  11. Rapid cycling with true potato seed

    Technology Transfer Automated Retrieval System (TEKTRAN)

    Rapid generation cycling via true seed production can increase the efficiency of potato breeding programs and genetics studies. This study was carried out to determine the fruit ripening and seed treatment conditions needed for generating true potato seed (TPS) with a high germination rate in a shor...

  12. Reclamation Strategies and Geomorphic Outcomes in Coal Surface Mines of Eastern Ohio

    NASA Astrophysics Data System (ADS)

    Pollock, M.; Jaeger, K. L.

    2014-12-01

    Coal surface mining is a significant landscape disturbance in the United States. Since 1977, the reclamation of mined lands has been regulated by the Surface Mine Control and Reclamation Act (SMCRA). Prior to the act, many coalfields were left un-reclaimed or partially reclaimed, with highly irregular topology and drainage networks. Under the act, the reverse is often true; adherence to SMCRA often leads to the homogenization of surfaces and channel networks. While both pre and post-SMCRA landscapes are highly altered, they exhibit strongly dissimilar characteristics. We examine pre-SMCRA, post-SMCRA and unmined watersheds at 3 spatial scales in order to compare the geomorphic differences between reclamation strategies. In particular, we attempt to separate anthropogenic factors from pre-existing, natural factors via comparisons to unmined watersheds. Our study design incorporates a 3 scale top-down analysis of 21 independent watersheds (7 of each treatment type). Each watershed has an area of approximately 1km2. All watersheds share similar geography, climate and geology. At the landscape scale, characteristics are derived from 0.762m (2.5ft) resolution Digital Elevation Models (DEMs). At the channel network scale, DEMs, as well as remote sensing data (including the National Wetlands Inventory database) are used. Finally, the reach scale incorporates longitudinal and cross-section surveys (using a total station) as well as a particle size distribution. At each scale, attributes are parameterized for statistical comparison. Post-SMCRA sites are characterized by a general reduction of watershed surface slopes (11.9% median) compared to pre-SMCRA (19.3%) and unmined (19.8%) sites. Both pre and post-SMCRA channel networks are characterized by significant surface impoundments (in the form of remnant headwall trenches on pre-SMCRA sites and engineered retention basins on post-SMCRA sites). Pre-SMCRA outlet reaches have significantly steeper bed slopes (2.79% mean) than

  13. Mineland reclamation and soil organic carbon sequestration in Ohio

    SciTech Connect

    Akala, V.A.; Lal, R.

    1999-07-01

    The mining industry has been continuously involved in initiatives to reduce the emission of green house gases in to atmosphere. Control measures have been introduced in all steps starting from the mining of coal to energy production. Reclamation of mined land was and is one of the eco-friendly measures adopted by the industry. Apart from the inherent benefits of reclamation to improve on and offsite environmental quality, its potential to produce biomass and enhance soil organic carbon (SOC) has not been addressed. Reclamative effects of establishing forest and pasture with (graded) and without topsoil (ungraded) application on soil quality and soil carbon sequestration was studied on mine land in Ohio. The SOC pool for 0--30 cm depth for the undisturbed control sites was 56.6 MgC/ha for forest and 66.3 MgC/ha for pasture. In comparison, the SOC pool in the forest and pasture of graded mineland for 0--30 cm depth after 25 years of reclamation was 58.9 MgC/ha and 62.7 MgC/ha respectively. In ungraded mineland, the SOC pool in the 0--30 cm depth after 30 years of reclamation was 51.5 MgC/ha in forest and 58.9 MgC/ha in the pasture.

  14. The myth of the true self.

    PubMed

    Anscombe, R

    1989-05-01

    The true self is a central construct of psychotherapy, but its status as fact or fiction is uncertain. Much of the plausibility of the true self comes from the concept's ambiguity, since it encompasses several different kinds of mental entity. It may be construed as a person's belief about himself or herself, as the experience of the working of the mind, or as a characterological essence. The true self is composed of qualities borrowed from these quite disparate kinds of self, none of which, considered singly, readily fits the description. However, if the true self is viewed as a fantasy, grounded on fact, of whom the patient might become, it is an instrument that gives coherence and direction to psychotherapy. PMID:2734420

  15. 43 CFR 404.43 - What process will Reclamation follow to determine if an appraisal investigation is ready for review?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Appraisal Investigations § 404.43 What process will Reclamation follow to determine if...

  16. True heterotopic bone in the paralyzed patient

    SciTech Connect

    Blane, C.E.; Perkash, I.

    1981-10-01

    In past years the clinical and radiologic presentation of true heterotopic bone in the paralyzed patient has been confused with osteomyelitis, neoplasm, trauma, and thrombophlebitis. We reviewed 376 paralyzed patients' roentgenographic files and found 78 patients with soft tissue ossification unassociated with infection, neoplasm, or underlying fractures, which we called true heterotopic bone. From this population the usual spectrum of radiologic findings is described, so that the radiologist may separate roentgenographically a group of patients from other types of ectopic ossification.

  17. Reclamation chain of waste concrete: A case study of Shanghai.

    PubMed

    Xiao, Jianzhuang; Ma, Zhiming; Ding, Tao

    2016-02-01

    A mass of construction and demolition (C&D) waste are generated in Shanghai every year, and it has become a serious environment problem. Reclaiming the waste concrete to produce recycled aggregate (RA) and recycled aggregate concrete (RAC) is an effective method to reduce the C&D waste. This paper develops a reclamation chain of waste concrete based on the researches and practices in Shanghai. C&D waste management, waste concrete disposition, RA production and RAC preparation are discussed respectively. In addition, technical suggestions are also given according to the findings in practical engineering, which aims to optimize the reclamation chain. The results show that the properties of RA and RAC can well meet the requirement of design and practical application through a series of technical measures. The reclamation chain of waste concrete is necessary and appropriate for Shanghai, which provides more opportunities for the wider application of RA and RAC, and it shows a favorable environmental benefit. PMID:26452425

  18. Acidic minespoil reclamation with alkaline biosolids

    SciTech Connect

    Drill, C.; Lindsay, B.J.; Logan, T.L.

    1998-12-31

    The effectiveness of an alkaline stabilized biosolids product, N-Viro Soil (NVS), was studied at a wild animal preserve in Cumberland, OH. The preserve occupies land that was strip mined for high-sulfur coal. While most of the land has been conventionally reclaimed, several highly acidic hot spots remain. Two of these hot spots were studied through concurrent field, greenhouse, and laboratory projects. In April 1995, NVS was applied at rates ranging from 0--960 mt/ha (wet wt.) to plots at the two sites. The plots were seeded using a standard reclamation mix and soil samples were analyzed for chemical characteristics before and after application and also in 1996 and 1997. Soil pH increased from 3.5 to about 11 in the amended plots and soil EC values increased from 21.0 mmho/cm to a maximum of 6.0 mmho/cm in the amended plots immediately after application. Soil Cu and Zn concentrations also increased in the NVS amended plots, but this did not affect plant germination or growth. By the summer of 1996, soil pH values had decreased to 7.3--8.7 and EC values decreased to 0.34--1.36 mmho/cm to the amended plots. Soil samples were collected in September 1995 for physical analyses. N-Viro Soil improved the moisture retention and water conductivity properties of the spoil. The plots were monitored for growth during the summer of 1995 and plant biomass and soil samples were taken in 1996 and 1997 for trace element and nutrient analysis. NVS did not significantly increase trace element concentrations in the biomass. The addition of NVS to acid mine spoil improves the chemical and physical properties of the spoil material thus aiding vegetative establishment and growth. NVS improves the chemical nature of the spoil by increasing pH and providing micro and macronutrients and improves the physical properties of the spoil with the addition of organic matter.

  19. 30 CFR 756.17 - Approval of the Hopi Tribe's abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... liability, and contractor responsibility; Section II, H and ranking and selection of noncoal reclamation... reclamation; Part VII—Hopi Department of Natural Resources (DNR) policy on public participation; Part VIII...

  20. 30 CFR 756.17 - Approval of the Hopi Tribe's abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... liability, and contractor responsibility; Section II, H and ranking and selection of noncoal reclamation... reclamation; Part VII—Hopi Department of Natural Resources (DNR) policy on public participation; Part VIII...

  1. Land reclamation on the Nevada Test Site: A field tour

    SciTech Connect

    Winkel, V.K.; Ostler, W.K.

    1993-12-31

    An all-day tour to observe and land reclamation on the Nevada Test Site was conducted in conjunction with the 8th Wildland Shrub and Arid Land Restoration Symposium. Tour participants were introduced to the US Department of Energy reclamation programs for Yucca Mountain Site Characterization Project and Treatability Studies for Soil Media (TSSM) Project. The tour consisted of several stops that covered a variety of topics and studies including revegetation by seeding, topsoil stockpile stabilization, erosion control, shrub transplanting, shrub herbivory, irrigation, mulching, water harvesting, and weather monitoring.

  2. 30 CFR 917.21 - Approval of Kentucky abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... reclamation plan amendments. 917.21 Section 917.21 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH..., 618 Teton Trail, Frankfort, Kentucky 40601; or (2) Office of Surface Mining Reclamation...

  3. 75 FR 81643 - Hydropower Resource Assessment at Existing Reclamation Facilities-Draft Report

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-28

    ..., 2010 (75 FR 67993). The public review period was originally to end on December 6, 2010. DATES: Submit... Bureau of Reclamation Hydropower Resource Assessment at Existing Reclamation Facilities--Draft Report AGENCIES: Bureau of Reclamation, Interior. ACTION: Reopening of comment period for review of the...

  4. 43 CFR 404.45 - What will be included in the appraisal report prepared by Reclamation?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false What will be included in the appraisal report prepared by Reclamation? 404.45 Section 404.45 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Appraisal Investigations § 404.45 What will...

  5. 30 CFR 931.25 - Approval of New Mexico abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Approval of New Mexico abandoned mine land reclamation plan amendments. 931.25 Section 931.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE NEW MEXICO § 931.25 Approval of New Mexico abandoned mine land reclamation plan amendments....

  6. 30 CFR 931.25 - Approval of New Mexico abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Approval of New Mexico abandoned mine land reclamation plan amendments. 931.25 Section 931.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE NEW MEXICO § 931.25 Approval of New Mexico abandoned mine land reclamation plan amendments....

  7. 30 CFR 931.25 - Approval of New Mexico abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Approval of New Mexico abandoned mine land reclamation plan amendments. 931.25 Section 931.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE NEW MEXICO § 931.25 Approval of New Mexico abandoned mine land reclamation plan amendments....

  8. 43 CFR 404.17 - How will Reclamation evaluate my statement of interest?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false How will Reclamation evaluate my statement of interest? 404.17 Section 404.17 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview §...

  9. 43 CFR 404.22 - How will Reclamation evaluate my full proposal?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false How will Reclamation evaluate my full proposal? 404.22 Section 404.22 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.22 How...

  10. 30 CFR 916.20 - Approval of Kansas abandoned mine land reclamation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... reclamation plan. 916.20 Section 916.20 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT... § 916.20 Approval of Kansas abandoned mine land reclamation plan. The Secretary conditionally approved..., 1982. He fully approved the Kansas plan, as amended by Kansas House Bill No. 2994 on April 14,...

  11. 30 CFR 916.20 - Approval of Kansas abandoned mine land reclamation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... reclamation plan. 916.20 Section 916.20 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT... § 916.20 Approval of Kansas abandoned mine land reclamation plan. The Secretary conditionally approved..., 1982. He fully approved the Kansas plan, as amended by Kansas House Bill No. 2994 on April 14,...

  12. Photocopy of construction drawing, U.S. Reclamation Service, June 1909 (original ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of construction drawing, U.S. Reclamation Service, June 1909 (original print located at U.S. Bureau of Reclamation Upper Columbia Area Office, Yakima, Washington). "YAKIMA BASIN WASHINGTON, SHOWING RECLAMATION PROJECTS" - Kachess Dam, Kachess River, 1.5 miles north of Interstate 90, Easton, Kittitas County, WA

  13. 30 CFR 931.25 - Approval of New Mexico abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Approval of New Mexico abandoned mine land reclamation plan amendments. 931.25 Section 931.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE NEW MEXICO § 931.25 Approval of New Mexico abandoned mine land reclamation plan amendments....

  14. 30 CFR 943.25 - Approval of Texas abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Approval of Texas abandoned mine land reclamation plan amendments. 943.25 Section 943.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE TEXAS § 943.25 Approval of Texas abandoned mine land reclamation plan amendments. The following...

  15. 30 CFR 943.25 - Approval of Texas abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Approval of Texas abandoned mine land reclamation plan amendments. 943.25 Section 943.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE TEXAS § 943.25 Approval of Texas abandoned mine land reclamation plan amendments. The following...

  16. 30 CFR 943.25 - Approval of Texas abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Approval of Texas abandoned mine land reclamation plan amendments. 943.25 Section 943.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE TEXAS § 943.25 Approval of Texas abandoned mine land reclamation plan amendments. The following...

  17. 30 CFR 943.25 - Approval of Texas abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Approval of Texas abandoned mine land reclamation plan amendments. 943.25 Section 943.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE TEXAS § 943.25 Approval of Texas abandoned mine land reclamation plan amendments. The following...

  18. 30 CFR 943.25 - Approval of Texas abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Approval of Texas abandoned mine land reclamation plan amendments. 943.25 Section 943.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE TEXAS § 943.25 Approval of Texas abandoned mine land reclamation plan amendments. The following...

  19. 43 CFR 404.45 - What will be included in the appraisal report prepared by Reclamation?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false What will be included in the appraisal report prepared by Reclamation? 404.45 Section 404.45 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY...

  20. 43 CFR 429.15 - Is Reclamation required to issue a use authorization?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Is Reclamation required to issue a use authorization? 429.15 Section 429.15 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR USE OF BUREAU OF RECLAMATION LAND, FACILITIES, AND WATERBODIES Requesting Authorization to Use...

  1. 43 CFR 422.9 - Reclamation law enforcement contracts and cooperative agreements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... authority listed in § 422.10; (5) Must expressly state that the officer has completed the Federal Bureau of... OF RECLAMATION, DEPARTMENT OF THE INTERIOR LAW ENFORCEMENT AUTHORITY AT BUREAU OF RECLAMATION... Federal laws. (b) Each contract and cooperative agreement authorizing the exercise of Reclamation...

  2. 43 CFR 422.9 - Reclamation law enforcement contracts and cooperative agreements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... authority listed in § 422.10; (5) Must expressly state that the officer has completed the Federal Bureau of... OF RECLAMATION, DEPARTMENT OF THE INTERIOR LAW ENFORCEMENT AUTHORITY AT BUREAU OF RECLAMATION... Federal laws. (b) Each contract and cooperative agreement authorizing the exercise of Reclamation...

  3. 43 CFR 422.9 - Reclamation law enforcement contracts and cooperative agreements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... authority listed in § 422.10; (5) Must expressly state that the officer has completed the Federal Bureau of... OF RECLAMATION, DEPARTMENT OF THE INTERIOR LAW ENFORCEMENT AUTHORITY AT BUREAU OF RECLAMATION... Federal laws. (b) Each contract and cooperative agreement authorizing the exercise of Reclamation...

  4. 43 CFR 422.9 - Reclamation law enforcement contracts and cooperative agreements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... authority listed in § 422.10; (5) Must expressly state that the officer has completed the Federal Bureau of... OF RECLAMATION, DEPARTMENT OF THE INTERIOR LAW ENFORCEMENT AUTHORITY AT BUREAU OF RECLAMATION... Federal laws. (b) Each contract and cooperative agreement authorizing the exercise of Reclamation...

  5. Reclamation problems and procedures for the oil industry and the canadian prairies

    SciTech Connect

    De Jong, E.

    1980-01-01

    Procedures used in western Canada to enhance biodegradation of waste oil are analyzed. In the prairie region, brine spills are more damaging to soil than oil spills are/ reclamation efforts aimed at neutralizing brine spills have been ineffective. Manure application is more immediately beneficial than gypsum application/ however, more research is needed to develop reclamation techniques that would provide acceptable soil reclamation.

  6. 30 CFR 756.17 - Approval of the Hopi Tribe's abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Approval of the Hopi Tribe's abandoned mine land reclamation plan amendments. 756.17 Section 756.17 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR INDIAN LANDS PROGRAM INDIAN TRIBE ABANDONED MINE LAND RECLAMATION PROGRAMS § 756.17 Approval...

  7. 30 CFR 942.25 - Approval of Tennessee abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Approval of Tennessee abandoned mine land reclamation plan amendments. 942.25 Section 942.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE TENNESSEE § 942.25 Approval of Tennessee abandoned mine land reclamation plan amendments....

  8. 30 CFR 931.25 - Approval of New Mexico abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Approval of New Mexico abandoned mine land reclamation plan amendments. 931.25 Section 931.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE NEW MEXICO § 931.25 Approval of New Mexico abandoned mine land reclamation plan amendments....

  9. 43 CFR 10005.17 - Plan development process.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Plan development process. 10005.17 Section 10005.17 Public Lands: Interior Regulations Relating to Public Lands (Continued) UTAH RECLAMATION...'S MITIGATION AND CONSERVATION PLAN § 10005.17 Plan development process. Following adoption of...

  10. 43 CFR 404.28 - Is it possible to expedite the completion of an appraisal investigation or feasibility study?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Is it possible to expedite the completion of an appraisal investigation or feasibility study? 404.28 Section 404.28 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.28 Is...

  11. 43 CFR 404.20 - What information must I include in my full proposal to conduct an appraisal or a feasibility study?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false What information must I include in my full proposal to conduct an appraisal or a feasibility study? 404.20 Section 404.20 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview §...

  12. 43 CFR 404.5 - Who is responsible for implementing this rule?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Who is responsible for implementing this rule? 404.5 Section 404.5 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.5 Who is responsible for implementing this rule? Authority...

  13. 43 CFR 404.11 - What type of assistance is available under the program?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false What type of assistance is available under the program? 404.11 Section 404.11 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.11 What type of assistance is available under...

  14. 43 CFR 402.11 - Termination or cancellation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Termination or cancellation. 402.11 Section 402.11 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR SALE OF LANDS IN FEDERAL RECLAMATION PROJECTS Public Lands § 402.11 Termination or cancellation. Immediately upon the...

  15. 43 CFR 404.35 - Is there a different non-Federal cost-share requirement for feasibility studies that involve a...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Is there a different non-Federal cost-share requirement for feasibility studies that involve a community greater than 50,000 inhabitants? 404.35 Section 404.35 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION...

  16. 43 CFR 402.4 - Citizenship requirement.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Citizenship requirement. 402.4 Section 402.4 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR SALE OF LANDS IN FEDERAL RECLAMATION PROJECTS Public Lands § 402.4 Citizenship requirement. Before patent may be issued to a...

  17. 43 CFR 404.18 - How can I request assistance to conduct a feasibility study?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false How can I request assistance to conduct a feasibility study? 404.18 Section 404.18 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.18 How can I request assistance to conduct...

  18. 43 CFR 404.7 - What types of projects are eligible for consideration under the program?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false What types of projects are eligible for consideration under the program? 404.7 Section 404.7 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.7 What types of projects...

  19. 43 CFR 404.15 - How can I request assistance under the program?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false How can I request assistance under the program? 404.15 Section 404.15 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.15 How can I request assistance under the program?...

  20. 43 CFR 402.5 - Procedures within the Department.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Procedures within the Department. 402.5 Section 402.5 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR SALE OF LANDS IN FEDERAL RECLAMATION PROJECTS Public Lands § 402.5 Procedures within the Department. (a) Before offering...

  1. 43 CFR 404.6 - Who is eligible to participate in the program?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Who is eligible to participate in the program? 404.6 Section 404.6 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.6 Who is eligible to participate in the program?...

  2. 43 CFR 420.3 - Adjacent lands.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Adjacent lands. 420.3 Section 420.3 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR OFF-ROAD VEHICLE USE § 420.3 Adjacent lands. When administratively feasible, the regulation of off-road vehicle use on Reclamation lands will...

  3. 43 CFR 402.1 - Purpose of this subpart.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Purpose of this subpart. 402.1 Section 402.1 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR SALE OF LANDS IN FEDERAL RECLAMATION PROJECTS Public Lands § 402.1 Purpose of this subpart. The regulations in this subpart apply to...

  4. 43 CFR 431.9 - Future regulations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Future regulations. 431.9 Section 431.9 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE... CANYON PROJECT, ARIZONA/NEVADA § 431.9 Future regulations. (a) Reclamation may from time to...

  5. 43 CFR 423.40 - Vehicles.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... addition to the regulations in this part, the regulations governing off-road-vehicle use in 43 CFR part 420... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Vehicles. 423.40 Section 423.40 Public... Vehicles. (a) When operating a vehicle on Reclamation lands and Reclamation projects, you must comply...

  6. 43 CFR 404.51 - Are proposed projects under the Rural Water Supply Program reviewed by the Administration?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Are proposed projects under the Rural... Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Feasibility Studies § 404.51 Are proposed projects under the Rural Water Supply...

  7. Extramedullary plasmacytoma of the true vocal fold.

    PubMed

    De Zoysa, Nilantha; Sandler, Belinda; Amonoo-Kuofi, Kwame; Swamy, Rajiv; Kothari, Prasad; Mochloulis, George

    2012-08-01

    We report a rare case of extramedullary plasmacytoma (EMP) of the true vocal fold. Our patient, a 62-year-old woman, presented with dysphonia. On workup, fiberoptic laryngoscopy detected a lesion arising from the anterior half of her left true vocal fold. No evidence of other pathology was noted. The patient underwent radical radiotherapy, and the lesion resolved. Follow-up revealed no sign of recurrence. A type of myeloma, EMP is rare, especially in the larynx. To the best of our knowledge, our patient represents the sixth case of glottic EMP to be reported in the literature. PMID:22930090

  8. Remote sensing for mined area reclamation: Application inventory

    NASA Technical Reports Server (NTRS)

    1971-01-01

    Applications of aerial remote sensing to coal mined area reclamation are documented, and information concerning available data banks for coal producing areas in the east and midwest is given. A summary of mined area information requirements to which remote sensing methods might contribute is included.

  9. Microcomputer applications for concurrent aggregate mine operation and reclamation planning

    SciTech Connect

    Culp, B.K.

    1990-02-01

    As ever increasing need exists for the planning of aggregate mine operations and reclamation. The purpose of this thesis is to investigate microcomputer applications to assist in the development of a concurrent aggregate mine operation and reclamation plan. The thesis is divided into sections that encompassed three aspects. The first, Section 1 -- concurrent Aggregate Mine Operation and Reclamation Planning, examines the possibility of organizing the operation and reclamation of aggregate mining into a single plan or set of plans. The second section of the thesis, Section 2 -- Microcomputer Applications, describes the use of microcomputers within the mining industry and the landscape architecture profession. This section contains a review of the current types of programs and how they are used. The programs that were used for the case study and their applications and characteristics are also explored. The third and final section of the thesis, Section 3 -- Alden Quarry Case Study, applies the concepts of the first two sections to a practical situation. 35 refs., 49 figs., 7 tabs.

  10. Effectiveness analysis of energy reclamation from partially depleted batteries

    NASA Astrophysics Data System (ADS)

    Dougal, Roger A.; Gao, Lijun; Jiang, Zhenhua

    This paper presents the study of energy reclamation from partially depleted primary batteries using secondary battery cells as temporary energy repositories. A DC/DC power converter is interposed between the two types of batteries to control the discharging of the primary battery as well as the charging of the secondary battery. The energy reclamation process is simulated and verified in the virtual test bed (VTB) computational environment using pre-validated battery models. Energy transferring and power losses among components are quantificationally studied. For an example system including a lithium sulfur dioxide primary battery with an initial state-of-charge of 0.3 at 296 K, an aggregated total of 216 kJ of energy is reclaimed and 82.87% of the energy (179 kJ) is stored in a 10-cell lithium-ion battery pack. A simple application scenario is used to show the potentially significant benefit of performing this energy reclamation technology. The study results demonstrate that 8.3% of weight and 10% of cost are saved. The main factors affecting the system performance are varied and the effects are analyzed. The results show that battery energy reclamation can be improved by: (1) appropriately increasing the battery operating temperature, (2) using relatively low discharging current, and (3) improving the power converter efficiency at the user-specified discharging current level.

  11. Biological Aspects of Metal Waste Reclamation With Sewage Sludge

    Technology Transfer Automated Retrieval System (TEKTRAN)

    Smelter waste deposits pose an environmental threat worldwide. Sewage sludges are potentialy useful in reclamation of such sites. Biological aspects of revegetation of Zn and Pb smelter wastelands are discussed in a paper. The goal of the studies was to asses to what extent sludge treatment would...

  12. RECLAMATION OF PIPELINE RIGHT-OF-WAYS ON RANGELANDS

    Technology Transfer Automated Retrieval System (TEKTRAN)

    In the mid 1990s a large diameter natural gas pipeline was constructed across western Nevada. Reclamation of such right-of-ways is challenging because of both the severity and the linear nature of the disturbance. During construction, pipelines are highly visible at a landscape level to the general...

  13. 30 CFR 874.13 - Reclamation objectives and priorities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Section 874.13 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE..., safety, and property from extreme danger of adverse effects of coal mining practices, including the... effects of coal mining practices; and (ii) Are adjacent to a site that has been or will be addressed...

  14. 30 CFR 874.13 - Reclamation objectives and priorities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Section 874.13 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE..., safety, and property from extreme danger of adverse effects of coal mining practices, including the... effects of coal mining practices; and (ii) Are adjacent to a site that has been or will be addressed...

  15. 30 CFR 874.13 - Reclamation objectives and priorities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Section 874.13 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE..., safety, and property from extreme danger of adverse effects of coal mining practices, including the... effects of coal mining practices; and (ii) Are adjacent to a site that has been or will be addressed...

  16. 30 CFR 874.13 - Reclamation objectives and priorities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Section 874.13 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE..., safety, and property from extreme danger of adverse effects of coal mining practices, including the... effects of coal mining practices; and (ii) Are adjacent to a site that has been or will be addressed...

  17. 30 CFR 874.13 - Reclamation objectives and priorities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Section 874.13 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE..., safety, and property from extreme danger of adverse effects of coal mining practices, including the... effects of coal mining practices; and (ii) Are adjacent to a site that has been or will be addressed...

  18. PRIORITY POLLUTANTS IN THE CEDAR CREEK WASTEWATER RECLAMATION - RECHARGE FACILITIES

    EPA Science Inventory

    The Cedar Creek Wastewater Reclamation Plant (CCWRP) located in Nassau County, NY is a 0.24 cu m/s (5.5 mgd) advanced wastewater treatment (AWT) plant designed to produce a high quality effluent suitable for groundwater recharge. The CCWRP was constructed as a demonstration proje...

  19. Recycling: Establishing a Citizen-Sponsored Reclamation Center.

    ERIC Educational Resources Information Center

    Keep America Beautiful, Inc., New York, NY.

    This booklet applies the Clean Community System (CCS) of Keep America Beautiful, Inc. to the development of citizen-sponsored recycling projects. Six initial steps in establishing a reclamation center are given and include information gathering, market analysis, legal requirements, and site location. Suggestions are included for recruiting staff…

  20. Mining and Reclamation Cooperative Education Program. Progress Report.

    ERIC Educational Resources Information Center

    Barnett, Carl D.

    The exemplary project was the cooperative effort of two schools in the western Kentucky coal fields to field test a program in mining and reclamation technology. Covering the first year of the project, the report describes the problem and scope of the study, the objectives pursued, the methodology, and the results obtained. The goal of the project…

  1. Impact of Land Reclamation on the Coastal Areas in Istanbul

    NASA Astrophysics Data System (ADS)

    Burak, Selmin; Kucukakca, Emrah

    2015-04-01

    Istanbul lies on both sides of the Bosphorus, the Golden Horn and the Marmara Sea which is an inland sea. The city is a large metropolis having more than 15 million of population that has been subjected to heavy and unplanned urbanization due to natural growth and immigration from the Eastern regions of Turkey, in particular. This resulted in loss of green areas and gave rise to land reclamation on the coastal areas of the Marmara Sea in order to provide ring roads along the seaside and substitute the lost green areas by newly generated recreational areas. Therefore heavy land reclamation on the coastal areas of the Marmara Sea has been the major environmental concern related to the damage caused to the coastal ecosystems during the last decade. The reclaimed land on the Northern shoreline of the Marmara Sea has reached 80% as of 2014. As widely known, coastal areas are the main housbandary and spawning areas for coastal ecosystems and pelagic species. Due to inappropriate reclamation processes, significant decrease in coastal ecosystems and species has been reported in several studies, Istanbul is no exception. Coastal zones are complex systems exhibiting specific environmental and socio-economic particularities. In recent years, many organizations, governments and policy-makers have pointed out the urgent need to develop global, regional, national and local strategies to ensure the protection and sustainable use of coastal zones. A long-term sustainable development of coastal areas cannot be achieved without the preservation of natural resources on which the development relies. The dilemma is to ensure the sustainable development of natural resources which is not the case as reported in several studies. Continuous exposure of the Istanbul coastal areas to uncontrolled, unplanned and inappropriate reclamation methods from past to present and recently experienced enhanced reclamation has been a major concern that is expressed by the scientific society. However

  2. Automated balance for determining true mass

    SciTech Connect

    Meyer, J.E.

    1982-08-08

    An automated weighing system utilizing a precision electronic balance and a small desktop computer is described. An example of a computer program demonstrating some of the capabilities attainable with this system is included. The program demonstrates a substitution weighing technique with true mass determination for the object being weighed.

  3. Radiometer gives true absorption and emission coefficients

    NASA Technical Reports Server (NTRS)

    Fymat, A. L.

    1977-01-01

    Novel radiometer, unaffected by scattering and polarization, measures true absorption and emmission coefficients for arbitrary mixture of gases and polluting particles. It has potential astronomical, meteorological, and environmental applications, such as determination of radiative heat budget, aerosol relative concentration, and morphology of cloud, haze, and fog formations. Data and temperature can be coupled directly to small computer for online calculation of radiation coefficients.

  4. How to Make Their Dreams Come True

    ERIC Educational Resources Information Center

    Easley, Dauna

    2005-01-01

    The beginning of January--a fresh start. This presents a brand new opportunity to help students plan a bright future. This article provides a step-by-step guide to ensure a student's dreams come true. Each new year gives students another chance to get it right. The author provides the following 12 steps to ensure students' success in achieving…

  5. Numerical Validation of Analytical Biaxial True Stress—True Strain Curves from the Bulge Test

    NASA Astrophysics Data System (ADS)

    Vucetic, M.; Bouguecha, A.; Peshekhodov, I.; Götze, T.; Huinink, T.; Friebe, H.; Möller, T.; Behrens, B.-A.

    2011-08-01

    The present investigation deals with the validation of the experimentally obtained biaxial true stress—true strain curves of the HCT 780 C sheet material from the bulge test with the help of the FEA. Furthermore the investigation handles the consideration of the bending influence via the blank curvature evaluation with an optical measurement system Gom ARAMIS.

  6. An economic framework for analyzing reclamation after energy extraction in the Powder River Basin of Wyoming

    NASA Astrophysics Data System (ADS)

    Perry, Abby A.

    Wyoming's economy is highly dependent on natural gas and coal production, but energy extraction degrades rangelands. Federal and state laws and policies govern reclamation of disturbed lands. However, establishing sagebrush plant communities is difficult and defining successful reclamation can be challenging. We analyze reclamation costs in the Powder River Basin of northeastern Wyoming using coal company annual reclamation reports. We also construct a probabilistic mathematical programming model that characterizes a coal company's reclamation decision-,making process and proposes a way to incorporate uncertainty into reclamation modeling. We also use results from a plant sciences field experiment to incorporate costs into optimal seed mix and herbicide choice. This thesis also draws attention to the disconnect between the data biologists collect and the data that economists need to model reclamation decision-making.

  7. 30 CFR 756.20 - Approval of amendments to the Crow Tribe's abandoned mine land reclamation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... abandoned mine land reclamation plan. 756.20 Section 756.20 Mineral Resources OFFICE OF SURFACE MINING... RECLAMATION PROGRAMS § 756.20 Approval of amendments to the Crow Tribe's abandoned mine land reclamation plan..., 2007, certification of completion of coal reclamation effective April 1, 2008: Original...

  8. 30 CFR 756.20 - Approval of amendments to the Crow Tribe's abandoned mine land reclamation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... abandoned mine land reclamation plan. 756.20 Section 756.20 Mineral Resources OFFICE OF SURFACE MINING... RECLAMATION PROGRAMS § 756.20 Approval of amendments to the Crow Tribe's abandoned mine land reclamation plan..., 2007, certification of completion of coal reclamation effective April 1, 2008: Original...

  9. 43 CFR 429.33 - What are the consequences for using Reclamation land, facilities, and waterbodies without...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Reclamation land, facilities, and waterbodies without authorization? 429.33 Section 429.33 Public Lands... BUREAU OF RECLAMATION LAND, FACILITIES, AND WATERBODIES Prohibited and Unauthorized Uses of Reclamation Land, Facilities, and Waterbodies § 429.33 What are the consequences for using Reclamation...

  10. True random numbers from amplified quantum vacuum.

    PubMed

    Jofre, M; Curty, M; Steinlechner, F; Anzolin, G; Torres, J P; Mitchell, M W; Pruneri, V

    2011-10-10

    Random numbers are essential for applications ranging from secure communications to numerical simulation and quantitative finance. Algorithms can rapidly produce pseudo-random outcomes, series of numbers that mimic most properties of true random numbers while quantum random number generators (QRNGs) exploit intrinsic quantum randomness to produce true random numbers. Single-photon QRNGs are conceptually simple but produce few random bits per detection. In contrast, vacuum fluctuations are a vast resource for QRNGs: they are broad-band and thus can encode many random bits per second. Direct recording of vacuum fluctuations is possible, but requires shot-noise-limited detectors, at the cost of bandwidth. We demonstrate efficient conversion of vacuum fluctuations to true random bits using optical amplification of vacuum and interferometry. Using commercially-available optical components we demonstrate a QRNG at a bit rate of 1.11 Gbps. The proposed scheme has the potential to be extended to 10 Gbps and even up to 100 Gbps by taking advantage of high speed modulation sources and detectors for optical fiber telecommunication devices. PMID:21997077

  11. Interim reclamation report: Basalt Waste Isolation Project exploration shaft site

    SciTech Connect

    Brandt, C.A.; Rickard, W.H. Jr.; Hefty, M.G.

    1990-02-01

    In 1968, a program was started to assess the feasibility of storing Hanford Site defense waste in deep caverns constructed in basalt. This program was expanded in 1976 to include investigations of the Hanford Site as a potential location for a mined commercial nuclear waste repository. Extensive studies of the geotechnical aspects of the site were undertaken, including preparations for drilling a large diameter Exploratory Shaft. This report describes the development of the reclamation program for the Exploratory Shaft Facility, its implementation, and preliminary estimates of its success. The goal of the reclamation program is to return sites disturbed by the repository program as nearly as practicable to their original conditions using native plant species. 43 refs., 19 figs., 9 tabs.

  12. Mycorrhizal fungi + trees -- practical beneficial tools for mineland reclamation

    SciTech Connect

    Cordell, C.E.; Marx, D.H.; Jenkins, B.

    1996-12-31

    Successful consistent revegetation of drastically disturbed sites (i.e., acid coal spoils and mineral waste dumps) throughout the US and several foreign countries has been achieved by using the biological {open_quotes}tools{close_quotes} -- Mycor Tree {trademark} seedlings and native shrub and grass species. These unique plants are custom-grown in bareroot and container nurseries with selected mycorrhizal fungi. On disturbed sites, specific mycorrhizal fungi such as Pisolithus tinctorius (PT) or VAM provide significant benefits to the plant symbionts through increased water and nutrient absorption, decreased toxic materials absorption, and overall plant stress reduction. During the past 15 years, the Ohio Division of Reclamation--Abandoned Minelands Project (AML) has utilized the combination of the PT fungus and reforestation to significantly improve the effectiveness and reduce the cost of AML projects. Since 1981, over 3.5 million PT-inoculated pine and oak seedlings have been planted on approximately 2,500 acres of unreclaimed AML sites. Tree survival has averaged over 85 percent in the PT-inoculated tree plantings with few failures as compared with less than 50% survival and over 75% failures in previous plantings with the same noninoculated tree species. From 1981 to 1995, the 2,348 acres reclaimed in Ohio have cost approximately $832,000.00. Traditional reclamation would have cost approximately $14 million and represents a 94% cost reduction. The total PT reforestation cost in 1995 was $354.00 per acre and the added cost of the PT-inoculated seedlings is approximately 13% ($45.00/acre) or $.03 per seedling. This is a minute expense when compared to conventional AML reclamation costs ($6,000/acre). Interest in the application of this natural environmentally-friendly technology to mineland reclamation programs throughout the US and abroad is expanding.

  13. Reclamation studies on oil shale lands in northwestern Colorado

    SciTech Connect

    Cook, C.W.; Redente, E.F.

    1980-02-01

    The overall objective of this project is to study the effects of various reclamation practices on above- and belowground ecosystem development associated with disturbed oil shale lands in northwestern Colorado. Plant growth media that are being used in field test plots include retorted shale, soil over retorted shale, subsoil materials, and surface disturbed topsoils. Some of the more significant results are: (1) a soil cover of at least 61 cm in conjunction with a capiallary barrier provided the best combination of treatments for the establishment of vegetation and a functional microbial community, (2) aboveground production values for native and introduced species mixtures are comparable after three growing seasons, (3) cover values for native species mixtures are generally greater than for introduced species, (4) native seed mixtures, in general, allow greater invasion to occur, (5) sewage sludge at relatively low rates appears to provide the most beneficial overall effect on plant growth, (6) cultural practices, such as irrigated and mulching have significant effects on both above- and belowground ecosystem development, (7) topsoil storage after 1.5 years does not appear to significantly affect general microbial activities but does reduce the mycorrhizal infection potential of the soil at shallow depths, (8) populations of mycorrhizal fungi are decreased on severely disturbed soils if a cover of vegetation is not established, (9) significant biological differences among ecotypes of important shrub species have been identified, (10) a vegetation model is outlined which upon completion will enable the reclamation specialist to predict the plant species combinations best adapted to specific reclamation sites, and (11) synthetic strains of two important grass species are close to development which will provide superior plant materials for reclamation in the West.

  14. Equivalency testing of ultraviolet disinfection for wastewater reclamation

    SciTech Connect

    Oppenheimer, J.A.; Jacangelo, J.G.; Laine, J.M.

    1996-11-01

    UV light disinfection was shown to continuously provide microbial inactivation equivalent to chlorine while reducing the formation of known carcinogenic disinfection by-products and the formation of chronic whole effluent toxicity. This was the first study to demonstrate UV`s performance relative to chlorination over an extended timeframe at a full-scale facility treating to meet the most stringent California reclamation standards.

  15. Analytical description of true stress-true strain curves for neutron-irradiated stainless austenitic steels

    SciTech Connect

    Gussev, Maxim N; Byun, Thak Sang; Busby, Jeremy T

    2012-01-01

    This paper summarizes the results of an investigation for the deformation hardening behaviors of neutron-irradiated stainless steels in terms of true stress( ) true strain( ) curves. It is commonly accepted that the - curves are more informative for describing plastic flow, but there are few papers devoted to using the true curves for describing constitutive behaviors of materials. This study uses the true curves obtained from stainless steel samples irradiated to doses in the range of 0 55 dpa by various means: finite element calculation, optic extensomentry, and recalculation of engineering curves. It is shown that for the strain range 0 0.6 the true curves can be well described by the Swift equation: =k ( - 0)0.5. The influence of irradiation on the parameters of the Swift equation is investigated in detail. It is found that in most cases the k-parameter of this equation is not changed significantly by irradiation. Since large data scattering was observed for the 0-parameter, a modified Swift equation =k*( - 0 2/k2)0.5 was proposed and evaluated. This equation is based on the concept of zero stress, which is, in general, close to yield stress. The relationships among k, 0, and damage dose are discussed in detail, so as to more accurately describe the true curves for irradiated stainless steels.

  16. Treatment of RO brine-towards sustainable water reclamation practice.

    PubMed

    Ng, H Y; Lee, L Y; Ong, S L; Tao, G; Viawanath, B; Kekre, K; Lay, W; Seah, H

    2008-01-01

    Treatment and disposal of RO brine is an important part in sustaining the water reclamation practice. RO brine generated from water reclamation contains high concentration of organic and inorganic compounds. Cost-effective technologies for treatment of RO brine are still relatively unexplored. Thus, this study aim to determine a feasible treatment process for removal of both organic and inorganic compounds in RO brine generated from NEWater production. The proposed treatment consists of biological activated carbon (BAC) column followed by capacitive deionization (CDI) process for organic and inorganic removals, respectively. Preliminary bench-scale study demonstrated about 20% TOC removal efficiency was achieved using BAC at 40 mins empty bed contact time (EBCT) while the CDI process was able to remove more than 90% conductivity reducing it from 2.19 mS/cm to only about 164 microS/cm. More than 90% cations and anions in the BAC effluent were removed using CDI process. In addition, TOC and TN removals of 78% and 91%, respectively were also attained through this process. About 90% water recovery was achieved. This process shows the potential of increased water recovery in the reclamation process while volume for disposal can be further minimized. Further studies on the sustainable operation and process optimization are ongoing. PMID:18776632

  17. Oil reclamation from waste plastics including polyvinyl chloride

    SciTech Connect

    Tadauchi, M.

    1995-12-31

    The purpose of this report is to present the results of plant scaleup investigations for oil reclamation from waste plastics. The reclamation process examined was thermal decomposition of polypropylene (PP) and polyvinyl chloride (PVC) under alkali addition and subsequent pressurization. Thermal analyses of the two plastics was performed, indicating that hydrogen chloride evolution occurs at around 300 C and decomposition of PP and oil formation occurs occures arount 450 C. A pilot plant was built and tested with PP and PVC pellets. In accordance with thermal analyses, the temperature of the pyrolysis chamber was raised in two steps. Pilot plant results were compared with bench-scale pilot plant and laboratory experiments. The oil reclamation ratio became smaller with an increase in the volume of the pyrolysis chamber due to temperature distributions and deposition of polymer-alkali residue. Molecular weight distributions of the recovered oil were similar for all three vessels. It was also found that the chlorine concentration in the organic chlorinated compounds in the reclaimed oil stayed below 1/30 that of the oil reclaimed from PVC decomposition without alkali in a laboratory flask-scale vessel.

  18. Wastewater reclamation and recharge: A water management strategy for Albuquerque

    SciTech Connect

    Gorder, P.J.; Brunswick, R.J.; Bockemeier, S.W.

    1995-12-31

    Approximately 61,000 acre-feet of the pumped water is annually discharged to the Rio Grande as treated wastewater. Albuquerque`s Southside Water Reclamation Plant (SWRP) is the primary wastewater treatment facility for most of the Albuquerque area. Its current design capacity is 76 million gallons per day (mgd), which is expected to be adequate until about 2004. A master plan currently is being prepared (discussed here in Wastewater Master Planning and the Zero Discharge Concept section) to provide guidelines for future expansions of the plant and wastewater infrastructure. Construction documents presently are being prepared to add ammonia and nitrogen removal capability to the plant, as required by its new discharge permit. The paper discusses water management strategies, indirect potable reuse for Albuquerque, water quality considerations for indirect potable reuse, treatment for potable reuse, geohydrological aspects of a recharge program, layout and estimated costs for a conceptual reclamation and recharge system, and work to be accomplished under phase 2 of the reclamation and recharge program.

  19. Staunton 1 reclamation demonstration project. Aquatic ecosystems. Final report

    SciTech Connect

    Vinikour, W. S.

    1981-02-01

    To provide long-term indications of the potential water quality improvements following reclamation efforts at the Staunton 1 Reclamation Demonstration Project, macroinvertebrates were collected from three on-site ponds and from the receiving stream (Cahokia Creek) for site drainage. Implications for potential benthic community differences resulting from site runoff were disclosed, but macroinvertebrate diversity throughout Cahokia Creek was limited due to an unstable, sandy substrate. The three ponds sampled were the New Pond, which was created as part of the reclamation activities; the Shed Pond, which and the Old Pond, which, because it was an existing, nonimpacted pond free of site runoff, served as a control. Comparisons of macroinvertebrates from the ponds indicated the potential for the New Pond to develop into a productive ecosystem. Macroinvertebrates in the New Pond were generally species more tolerant of acid mine drainage conditions. However, due to the present limited faunal densities and the undesirable physical and chemical characteristics of the New Pond, the pond should not be stocked with fish at this time.

  20. Environmental Responses to a Land Reclamation Project in South Korea

    NASA Astrophysics Data System (ADS)

    Son, SeungHyun; Wang, Menghua

    2009-11-01

    In 1991, South Korea embarked on an ambitious project to reclaim nearly 401 square kilometers of land and tidal flats from the Yellow Sea by building a system of two dikes extending 33 kilometers across the mouths of the Dongjin and Mangyeong rivers, offshore of the Saemangeum district (see Figures 1a and 1b). Called the Saemangeum Reclamation Project, the endeavor will allot about 283 square kilometers of the reclaimed land for crop production (mostly rice) through irrigation of the rivers’ estuaries, which will be extended by about 23 kilometers when the bay fills up. The rest of the reclaimed land will be a water reservoir for agricultural use [Lie et al., 2008]. The construction of the Saemangeum Reclamation Project's northern dike was completed in June 2003; the southern dike was finished in April 2006. Two gaps in the southern dike allow water exchange, and two gates control the water level inside the dikes. The reclamation project, the biggest such endeavor in South Korea, is expected to be completed around 2030.

  1. Interim reclamation report, Basalt Waste Isolation project: Boreholes, 1989

    SciTech Connect

    Brandt, C.A.; Rickard, W.H. Jr.; Hefty, M.G.

    1990-03-01

    In 1968, a program was started to assess the feasibility of storing Hanford Site defense waste in deep caverns constructed in basalt. This program was expanded in 1976 to include investigations of the Hanford Site as a potential location for a mined commercial nuclear waste repository. An extensive site characterization program was begun to determine the feasibility of using the basalts beneath the Hanford Site for the repository. Site research focused primarily on determining the direction and speed of groundwater movement, the uniformity of basalt layers, and tectonic stability. Some 98 boreholes were sited, drilled, deepened, or modified by BWIP between 1977 and 1988 to test the geologic properties of the Site. On December 22, 1987, President Reagan signed into law the Nuclear Waste Policy Amendments Act of 1987, which effectively stopped all repository-related activities except reclamation of disturbed lands at the Hanford Site. This report describes the development of the reclamation program for the BWIP boreholes, its implementation, and preliminary estimates of its success. The goal of the reclamation program is to return sites disturbed by the repository program as nearly as practicable to their original conditions using native plant species. 48 refs., 28 figs., 14 tabs.

  2. Approval of State and Indian Reclamation Program grants under Title IV of the Surface Mining Control and Reclamation Act of 1977: final environmental import statement

    SciTech Connect

    Not Available

    1983-01-01

    Approval of annual grant applications to states and Indian tribes is proposed in accordance with Title IV of the Surface Mining Control and Reclamation Act of 1977 (SMCRA). The grants are financed through assessments for abandoned coal mine reclamation. Fund collections are to continue through 1992. Granting of all available funds would provide the maximum possible amount of money and promote the highest level of reclamation of mined areas. Health and safety hazards associated with unreclaimed mines would be lessened, and habitat for fish, wildlife, and vegetation would be enhanced significantly. Mining reclamation projects would require evacuation of residents in affected areas. Reclamation activities would create dust and sediments, degrading air quality and surface flows. Endangered bat species dwelling in mine openings would be displaced or destroyed due to mine closures.

  3. Mine drainage and surface-mine reclamation. Volume 2. Mine reclamation, abandoned mine lands, and policy issues. Information Circular/1988

    SciTech Connect

    Not Available

    1988-01-01

    Mine waste and mine reclamation are topics of major interest to the mining industry, the government and the general public. The publication and its companion volume are the proceedings of a conference held in Pittsburgh, April 19-21, 1988. There were nine sessions (50 papers) that dealt with the geochemistry, hydrology and problems of mine waste and mine water, especially acid mine drainage. The nine sessions (43 papers) that dealt with reclamation and restoration of disturbed lands, as well as related policy issues, are included in volume 2. Volume 2 also contains the ten papers that pertained to control of subsidence and mine fires at abandoned mines. Poster session presentations are, in general, represented by abstracts.

  4. [True color accuracy in digital forensic photography].

    PubMed

    Ramsthaler, Frank; Birngruber, Christoph G; Kröll, Ann-Katrin; Kettner, Mattias; Verhoff, Marcel A

    2016-01-01

    Forensic photographs not only need to be unaltered and authentic and capture context-relevant images, along with certain minimum requirements for image sharpness and information density, but color accuracy also plays an important role, for instance, in the assessment of injuries or taphonomic stages, or in the identification and evaluation of traces from photos. The perception of color not only varies subjectively from person to person, but as a discrete property of an image, color in digital photos is also to a considerable extent influenced by technical factors such as lighting, acquisition settings, camera, and output medium (print, monitor). For these reasons, consistent color accuracy has so far been limited in digital photography. Because images usually contain a wealth of color information, especially for complex or composite colors or shades of color, and the wavelength-dependent sensitivity to factors such as light and shadow may vary between cameras, the usefulness of issuing general recommendations for camera capture settings is limited. Our results indicate that true image colors can best and most realistically be captured with the SpyderCheckr technical calibration tool for digital cameras tested in this study. Apart from aspects such as the simplicity and quickness of the calibration procedure, a further advantage of the tool is that the results are independent of the camera used and can also be used for the color management of output devices such as monitors and printers. The SpyderCheckr color-code patches allow true colors to be captured more realistically than with a manual white balance tool or an automatic flash. We therefore recommend that the use of a color management tool should be considered for the acquisition of all images that demand high true color accuracy (in particular in the setting of injury documentation). PMID:27386623

  5. True anteroposterior view pedicle screw insertion technique

    PubMed Central

    Bai, Jia-yue; Zhang, Wei; An, Ji-long; Sun, Ya-peng; Ding, Wen-yuan; Shen, Yong

    2016-01-01

    Background The wide use of minimally invasive transforaminal lumbar interbody fusion (MIS-TLIF) surgery in the treatment of degenerative disc disease of lumbar spine in spinal surgery highlights the gradual decrease in the use of traditional pedicle screw insertion technology. This study aims to analyze the accuracy of the true anteroposterior view pedicle screw insertion technique in MIS-TLIF surgery, compare it with conventional pedicle screw insertion technology, and discuss its clinical application value. Methods Fifty-two patients undergoing true anteroposterior view (group A) and 87 patients undergoing conventional pedicle screw insertion (group B) were diagnosed with lumbar disc herniation or lumbar spinal stenosis. Time for screw placement, intraoperative irradiation exposure, accuracy rate of pedicle screw insertion, and incidence of neurovascular injury were compared between the two groups. Results The time for screw placement and intraoperative irradiation exposure was significantly less in group A. Penetration rates of the paries lateralis of vertebral pedicle, medial wall of vertebral pedicle, and anterior vertebral wall were 1.44%, 0%, and 2.40%, respectively, all of which were significantly lower than that in group B. No additional serious complications caused by the placement of screw were observed during the follow-up period in patients in group A, but two patients with medial penetration underwent revision for unbearable radicular pain. Conclusion The application of true anteroposterior view pedicle screw insertion technique in MIS-TLIF surgery shortens time for screw placement and reduces the intraoperative irradiation exposure along with a higher accuracy rate of screw placement, which makes it a safe, accurate, and efficient technique. PMID:27418828

  6. True reason for Zipf's law in language

    NASA Astrophysics Data System (ADS)

    Dahui, Wang; Menghui, Li; Zengru, Di

    2005-12-01

    Analysis of word frequency have historically used data that included English, French, or other language, data typically described by Zipf's law. Using data on traditional and modern Chinese literatures, we show here that Chinese character frequency stroked Zipf's law based on literature before Qin dynasty; however, it departed from Zipf's law based on literature after Qin dynasty. Combined with data about English dictionaries and Chinese dictionaries, we show that the true reason for Zipf's Law in language is that growth and preferential selection mechanism of word or character in given language.

  7. Online Tools at the U.S. Bureau of Reclamation

    NASA Astrophysics Data System (ADS)

    Hunter, S. M.

    2004-12-01

    Reclamation is the major Federal water resources management agency operating in the 17 western States, where it has over 350 reservoirs, numerous irrigation systems, and related infrastructure. Escalating human needs for finite water supplies make it essential that Reclamation manage its many water systems with the greatest practical efficiency. Efficient system operation depends heavily on accurate short-term and seasonal streamflow forecasts. Spring streamflows, derived largely from snowmelt and rains on snow, are especially critical to Reclamation's water management. The inability to quantitatively predict such streamflows beyond climatological values has been a major problem, and one of the major causes of this inability is inaccurate or spatially sparse quantitative precipitation estimate (QPE) data. To address these shortcomings, Reclamation's River Systems and Meteorology group has developed several online tools for QPE data access and visualization. The major tool is the Agricultural WAter Resources Decision Support (AWARDS) system. The purpose of the AWARDS system is to improve the efficiency of water management and irrigation scheduling by providing guidance on when and where to deliver water, and how much to apply. The AWARDS system has been designed for use by reservoir system operators, water district staff, and on-farm irrigators. AWARDS is operational in several regions of the West. At the heart of AWARDS is near-real-time QPE from the national WSR-88D radar network, providing hourly and daily accumulations at a nominal 2 km spatial resolution. The QPE is produced by either the National Weather Service Multi-sensor Precipitation Estimator (MPE) or Reclamation's Precipitation Accumulation Algorithm (PAA). The latter algorithm can estimate snow water equivalent (SWE) or snow depth from snowfall. Reclamation scientists have pursued close collaboration with other agencies in the formulation of AWARDS and precipitation-related information systems. A

  8. A comprehensive study on urban true orthorectification

    USGS Publications Warehouse

    Zhou, G.; Chen, W.; Kelmelis, J.A.; Zhang, Dongxiao

    2005-01-01

    To provide some advanced technical bases (algorithms and procedures) and experience needed for national large-scale digital orthophoto generation and revision of the Standards for National Large-Scale City Digital Orthophoto in the National Digital Orthophoto Program (NDOP), this paper presents a comprehensive study on theories, algorithms, and methods of large-scale urban orthoimage generation. The procedures of orthorectification for digital terrain model (DTM)-based and digital building model (DBM)-based orthoimage generation and their mergence for true orthoimage generation are discussed in detail. A method of compensating for building occlusions using photogrammetric geometry is developed. The data structure needed to model urban buildings for accurately generating urban orthoimages is presented. Shadow detection and removal, the optimization of seamline for automatic mosaic, and the radiometric balance of neighbor images are discussed. Street visibility analysis, including the relationship between flight height, building height, street width, and relative location of the street to the imaging center, is analyzed for complete true orthoimage generation. The experimental results demonstrated that our method can effectively and correctly orthorectify the displacements caused by terrain and buildings in urban large-scale aerial images. ?? 2005 IEEE.

  9. Economic feasibility analysis of water-harvesting techniques for mined-land reclamation

    SciTech Connect

    Nieves, L.A.; Marti, M.H.

    1981-07-01

    A water harvesting, agricultural production system, field tested as a means of reclaiming strip-mined land is described. Though the technical feasibility of the system is becoming increasingly apparent, economic feasibility and legal issues may determine its potential application. The purpose of this study is to explore the economic feasibility of the system and to provide information for use in assessing whether further investigation of water harvesting reclamation techniques is warranted. The economic feasibility of the PNL reclamation system hinges on whether its net benefits exceed those of conventional reclamation. This preliminary feasibility study assesses the net private benefits of each system using data for the Peabody Coal Company's Kayenta mine on the Black Mesa in Arizona. To compare the alternative reclamation systems, the present value of direct net benefits (income minus production and reclamation costs) is calculated for grazing (conventional reclamation) or for cropping (PNL reclamation). Three of the PNL system slope treatments have lower estimated total costs than conventional reclamation. The difference is $3895/acre for compacted slope, $3025/acre for salt-compacted slope and $2310/acre for crop-on-slope. These differences constitute a substantial cost advantage for the system on the basis of the present value of land reclamation and maintenance costs. The system also has advantages based on the estimated value of agricultural production capacity. Even the lowest yield levels considered for alfalfa, corn, and pinto beans had higher net present values than grazing.

  10. 30 CFR 904.25 - Approval of Arkansas abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...; Management accounting; and Abandoned mine land problem description. September 22, 1999 January 14, 2000... management and disposition of land and water; Reclamation on private land; Rights of entry;...

  11. 30 CFR 904.25 - Approval of Arkansas abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...; Management accounting; and Abandoned mine land problem description. September 22, 1999 January 14, 2000... management and disposition of land and water; Reclamation on private land; Rights of entry;...

  12. 30 CFR 904.25 - Approval of Arkansas abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...; Management accounting; and Abandoned mine land problem description. September 22, 1999 January 14, 2000... management and disposition of land and water; Reclamation on private land; Rights of entry;...

  13. 30 CFR 904.25 - Approval of Arkansas abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...; Management accounting; and Abandoned mine land problem description. September 22, 1999 January 14, 2000... management and disposition of land and water; Reclamation on private land; Rights of entry;...

  14. 30 CFR 904.25 - Approval of Arkansas abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...; Management accounting; and Abandoned mine land problem description. September 22, 1999 January 14, 2000... management and disposition of land and water; Reclamation on private land; Rights of entry;...

  15. In Search of the True Universe

    NASA Astrophysics Data System (ADS)

    Harwit, Martin

    2013-11-01

    1. The nineteenth century's last five years; Part I. The Import of Theoretical Tools: 2. An overview; 3. Conclusions based on principles; 4. Conclusions based on a premise; 5. Conclusions based on calculations; 6. Asking the right questions, accepting limited answers; Part II. A National Plan Shaping the Universe We Perceive: 7. A new order and the new universe it produced; 8. Where did the chemical elements arise?; 9. Landscapes; 10. The evolution of astrophysical theory after 1960; 11. Turmoils of leadership; 12. Cascades and shocks that shape astrophysics; 13. Astrophysical discourse and persuasion; Part III. The Cost of Discerning the True Universe: 14. Organization and functioning of the astronomical community; 15. Language and astrophysical stability; 16. An economically viable astronomical program; Epilogue.

  16. In Search of the True Universe

    NASA Astrophysics Data System (ADS)

    Harwit, Martin

    2014-01-01

    1. The nineteenth century's last five years; Part I. The Import of Theoretical Tools: 2. An overview; 3. Conclusions based on principles; 4. Conclusions based on a premise; 5. Conclusions based on calculations; 6. Asking the right questions, accepting limited answers; Part II. A National Plan Shaping the Universe We Perceive: 7. A new order and the new universe it produced; 8. Where did the chemical elements arise?; 9. Landscapes; 10. The evolution of astrophysical theory after 1960; 11. Turmoils of leadership; 12. Cascades and shocks that shape astrophysics; 13. Astrophysical discourse and persuasion; Part III. The Cost of Discerning the True Universe: 14. Organization and functioning of the astronomical community; 15. Language and astrophysical stability; 16. An economically viable astronomical program; Epilogue.

  17. Kepler's winding Path to true Heliocentrism

    NASA Astrophysics Data System (ADS)

    Bialas, Volker

    The paper concerns the evolution of concepts by Johannes Kepler from Aristotelian conception of the Universe to Heliocentrism. Already as young Magister in Tubingen Kepler has taken an active part in Physical disputations of the candidates and has defended the doctrines of Copernik (1). In the Mysterium Cosmographicum he refers the planetary distances no longer to the center of the earth's orbit, but to the center of the true sun. But just by working out his Astronomia Nova Kepler succeeds in creating a strictly heliocentric astronomy as his handwriting Manuscripts give detailed information (2). Notes: 1) fragmentum orations de motu terrae. In Keppler Gesammelte werke Vol. 20.1, Munich 1988, p. 147-149 2) Commentaria in Theoriam Martis. Edition in: Kepler Gessamelete Werke Vol. 20.2 (in preparation)

  18. Geometric characterization of true quantum decoherence

    NASA Astrophysics Data System (ADS)

    Kayser, Julius; Luoma, Kimmo; Strunz, Walter T.

    2015-11-01

    Surprisingly often decoherence is due to classical fluctuations of ambient fields and may thus be described in terms of random unitary (RU) dynamics. However, there are decoherence channels where such a representation cannot exist. Based on a simple and intuitive geometric measure for the distance of an extremal channel to the convex set of RU channels we are able to characterize the set of true quantum phase-damping channels. Remarkably, using the Caley-Menger determinant, our measure may be assessed directly from the matrix representation of the channel. We find that the channel of maximum quantumness is closely related to a symmetric, informationally complete positive operator-valued measure on the environment. Our findings are in line with numerical results based on the entanglement of assistance.

  19. Easier patch testing with TRUE Test.

    PubMed

    Fischer, T; Maibach, H I

    1989-03-01

    TRUE Test, a standardized, ready-to-apply patch test system, is made from polyester covered with a film of allergens incorporated in a hydrophilic polymer. The patches are mounted on nonwoven cellulose tape with acrylic adhesive, covered with siliconized plastic, and packed in an air-tight and light-impermeable envelope. When the test strip is taped on the skin, perspiration hydrates the film and transforms it to a gel, which causes the allergen to be released. The first panel of 12 allergens and allergen mixes is standardized and tested for stability in vitro and in vivo. The accuracy of the test panel has been certified in international multicenter studies by comparing it with present patch test techniques. A second panel of 11 more allergens was completed in 1988. The two test panels include the full standard panel of the North American Contact Dermatitis Group. PMID:2918115

  20. True ternary fission of superheavy nuclei

    SciTech Connect

    Zagrebaev, V. I.; Karpov, A. V.; Greiner, Walter

    2010-04-15

    True ternary fission with formation of a heavy third fragment is quite possible for superheavy nuclei because of the strong shell effects leading to a three-body clusterization with the two doubly magic tinlike cores. The simplest way to discover this phenomenon in the decay of excited superheavy nuclei is a detection of two tinlike clusters with appropriate kinematics in low-energy collisions of medium-mass nuclei with actinide targets. The three-body quasi-fission process could be even more pronounced for giant nuclear systems formed in collisions of heavy actinide nuclei. In this case a three-body clusterization might be proved experimentally by the detection of two coincident leadlike fragments in low-energy U + U collisions.

  1. Uranus in True and False Color

    NASA Technical Reports Server (NTRS)

    1986-01-01

    These two pictures of Uranus -- one in true color (left) and the other in false color -- were compiled from images returned Jan. 17, 1986, by the narrow-angle camera of Voyager 2. The spacecraft was 9.1 million kilometers (5.7 million miles) from the planet, several days from closest approach. The picture at left has been processed to show Uranus as human eyes would see it from the vantage point of the spacecraft. The picture is a composite of images taken through blue, green and orange filters. The darker shadings at the upper right of the disk correspond to the day-night boundary on the planet. Beyond this boundary lies the hidden northern hemisphere of Uranus, which currently remains in total darkness as the planet rotates. The blue-green color results from the absorption of red light by methane gas in Uranus' deep, cold and remarkably clear atmosphere. The picture at right uses false color and extreme contrast enhancement to bring out subtle details in the polar region of Uranus. Images obtained through ultraviolet, violet and orange filters were respectively converted to the same blue, green and red colors used to produce the picture at left. The very slight contrasts visible in true color are greatly exaggerated here. In this false-color picture, Uranus reveals a dark polar hood surrounded by a series of progressively lighter concentric bands. One possible explanation is that a brownish haze or smog, concentrated over the pole, is arranged into bands by zonal motions of the upper atmosphere. The bright orange and yellow strip at the lower edge of the planet's limb is an artifact of the image enhancement. In fact, the limb is dark and uniform in color around the planet. The Voyager project is manages for NASA by the Jet Propulsion Laboratory.

  2. Indian Creek-AML: Coal slurry reclamation (Kansas case history)

    SciTech Connect

    Witthar, S.R.

    1998-12-31

    Black and Veatch, assisted by Jack Nawrot, developed conceptual and final designs and provided construction assistance to create grasslands and wetlands in order to reclaim an abandoned coal mine for the state of Kansas. The mine included spoils, a coal refuse dump, and slurry pond in the Indian Creek drainage basin in east central Kansas. The Indian Creek flowed from an off-site abandoned mine and through the coal slurry pond where its waters became more polluted. The intent of the reclamation project was to improve water quality and create a wildlife refuge. The coal refuse was covered and seeded with a diversity of vegetation including several grasses and legume. The slurry pond was developed into a series of large wetland cells to improve water quality. Prior to reclamation, the water leaving the site had a typical pH of 3.3, ranging from 2.4 to 5.6, an iron content which typically over 22 mg/L and ranging over 100 mg/L, and contained large amounts of coal slurry. The acid sediment in the slurry killed fish and caused visible damage to a new large concrete box culvert several miles downstream of the site. Post-reclamation water quality leaving the Indian Creek site showed immediate improvement even before vegetation was reestablished. The existing wetland treatment systems have been successfully treating water for over seven years with the pH of the water leaving the wetlands above 7 and soluble iron content less than 1 mg/L. Fish in the constructed wetlands support waterfowl which now nest onsite.

  3. Reclamation of prime farmland following mineral sands mining in Virginia

    SciTech Connect

    Daniels, W.L.; Schroeder, P.D.; Nagle, S.M.; Zelazny, L.W.; Alley, M.M.

    1999-07-01

    Significant deposits of mineral sands were discovered in Virginia's Upper Coastal Plain in 1989. The Old Hickory deposit is the largest ore body in the state (>2,000 ha) and supports a productive rowcrop agriculture on prime farmlands. field experiments were installed on pilot-scale (25 m x 60 m) mining pits in the late summer of 1995 and replicated on an adjacent undisturbed area. Half of each mining pit was topsoiled (25 cm) while the remaining half was left as either (1) mixed tails/slimes or (2) re-graded subsoil over tails/slimes to simulate various pit closure scenarios. Both non-topsoiled areas received 112 Mg/ha of yard waste compost as a soil building amendment. The entire area was ripped/disked to ameliorate compaction and incorporate lime and fertilizer additions. The experiment was cropped through a wheat/soybeans/corn/cotton rotation over the 1995 to 1998 growing seasons. Taken as a whole, these combined results clearly indicate that mining and reclamation of these prime farmlands will lead to a substantial decrease in rowcrop productivity, at least over the initial years following pit closure and reclamation. For the rotation studied, post-mining productivity was estimated by this experiment to be reduced by 23%, 3%, 27%, and 20% for each crop (wheat/soybeans/corn/cotton) in sequence. For a given crop in a given year, response to topsoiling versus compost addition to the surface varied, and neither treatment appeared superior. Corn and cotton yields on the mined land treatments were reduced despite the application of irrigation. Cotton quality was also adversely affected by the mining reclamation treatments. Results of these controlled experiments are somewhat encouraging. However, the implementation of protocols will be complicated in practice if tailings and slimes cannot be re-blended to generate a reasonably uniform final reclaimed surface.

  4. Water resources. Bureau of Reclamation's Bonneville Unit: future repayment arrangements

    SciTech Connect

    Not Available

    1986-03-01

    GAO is convinced that: the Bureau of Reclamation's use of the Water Supply Act of 1958 to defer a portion of municipal and industrial (M and I) costs of the Bonneville Unit was illegal, the Bureau's use of ad valorem (percentage of value) tax revenues from property owners to increase the Bonneville Unit's M and I customers repayment obligation under the 1965 contract was improper, and the Department of Energy Organization Act 1977 requires congressional approval of the modified cost allocation of the Bonneville Unit initiated by the Bureau in 1984.

  5. Photocatalytic post-treatment in waste water reclamation systems

    NASA Technical Reports Server (NTRS)

    Cooper, Gerald; Ratcliff, Matthew A.; Verostko, Charles E.

    1989-01-01

    A photocatalytic water purification process is described which effectively oxidizes organic impurities common to reclaimed waste waters and humidity condensates to carbon dioxide at ambient temperatures. With this process, total organic carbon concentrations below 500 ppb are readily achieved. The temperature dependence of the process is well described by the Arrhenius equation and an activation energy barrier of 3.5 Kcal/mole. The posttreatment approach for waste water reclamation described here shows potential for integration with closed-loop life support systems.

  6. Corrosion consequences of microfouling in water reclamation systems

    NASA Technical Reports Server (NTRS)

    Ford, Tim; Mitchell, Ralph

    1991-01-01

    This paper examines the potential fouling and corrosion problems associated with microbial film formation throughout the water reclamation system (WRS) designed for the Space Station Freedom. It is shown that the use of advanced metal sputtering techiques combined with image analysis and FTIR spectroscopy will present realistic solutions for investigating the formation and function of biofilm on different alloys, the subsequent corrosion, and the efficiency of different treatments. These techniques, used in combination with electrochemical measurements of corrosion, will provide a powerful approach to examinations of materials considered for use in the WRS.

  7. Automated strip mine and reclamation mapping from ERTS. [Ohio coal

    NASA Technical Reports Server (NTRS)

    Pettyjohn, W. A.; Rogers, R. H.; Reed, L. E.

    1974-01-01

    In response to the urgent need for a faster and more economical means of generating strip mine and reclamation maps, a study was conducted to evaluate the suitability of using ERTS computer compatible tape for automatic mapping. The procedure uses computer target spectral recognition techniques as a basis for classification. The area encompassed by this investigation includes five counties in eastern Ohio that comprise nearly 7,500 square kilometers (3,000 square miles). The counties have been disrupted by coal mining since the early 1800's, and strip mining has been practiced in all of them. The environmental effects of strip mining are also discussed.

  8. Water reclamation technology development for future long range missions

    NASA Technical Reports Server (NTRS)

    Flynn, Michael T.; Amo, Karl; Hightower, T. M.; Fisher, John

    1992-01-01

    This paper covers the development of computer simulation models of the Vapor Compression Distillation (VCD) process, the Super Critical Water Oxidation (SCWO) process, and two versions of a Vapor Phase Catalytic Ammonia Reduction (VPCAR) process. These process level models have combined into two Integrated Water Reclamation Systems (IWRS). Results from these integrated models, in conjunction with other data sources, have been used to develop a preliminary comparison of the two systems. Also discussed in this paper is the development of a Vapor Phase Catalytic Ammonia Reduction teststand and the development of a new urine analog for use with the teststand and computer models.

  9. Quantification of intensive hybrid coastal reclamation for revealing its impacts on macrozoobenthos

    NASA Astrophysics Data System (ADS)

    Yan, Jiaguo; Cui, Baoshan; Zheng, Jingjing; Xie, Tian; Wang, Qing; Li, Shanze

    2015-01-01

    Managing and identifying the sources of anthropogenic stress in coastal wetlands requires an in-depth understanding of relationships between species diversity and human activities. Empirical and experimental studies provide clear evidence that coastal reclamation can have profound impacts on marine organisms, but the focus of such studies is generally on comparative or laboratory research. We developed a compound intensity index (reclamation intensity index, RI) on hybrid coastal reclamation, to quantify the impacts of reclamation on coastal ecosystems. We also made use of mean annual absolute changes to a number of biotic variables (biodiversity, species richness, biomass of total macrozoobenthos, and species richness and biomass of Polychaeta, Mollusca, Crustacea, and Echinodermata) to determine Hedges’d index, which is a measure of the potential effects of coastal reclamation. Our results showed that there was significant difference of coastal reclamation intensity between Yellow Sea, East China Sea and South China Sea, the biological changes in effect sizes of the three regions differed greatly over time. Our modelling analyses showed that hybrid coastal reclamation generally had significant negative impacts on species diversity and biomass of macrozoobenthos. These relationships varied among different taxonomic groups and included both linear and nonlinear relationships. The results indicated that a high-intensity of coastal reclamation contributed to a pronounced decline in species diversity and biomass, while lower-intensity reclamation, or reclamation within certain thresholds, resulted in a small increase in species diversity and biomass. These results have important implications for biodiversity conservation and the ecological restoration of coastal wetlands in face of the intensive reclamation activities.

  10. 30 CFR 874.17 - AML agency procedures for reclamation projects receiving less than 50 percent government funding.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., vegetation, toxic materials, and hydrologic balance; (2) Ensure that the reclamation project is conducted in accordance with the provisions of 30 CFR subchapter R; (3) Develop specific-site reclamation...

  11. 30 CFR 874.17 - AML agency procedures for reclamation projects receiving less than 50 percent government funding.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., vegetation, toxic materials, and hydrologic balance; (2) Ensure that the reclamation project is conducted in accordance with the provisions of 30 CFR subchapter R; (3) Develop specific-site reclamation...

  12. Renewable Energy Assessment of Bureau of Reclamation Land and Facilities Using Geographic Information Systems

    SciTech Connect

    Heimiller, D.; Haase, S.; Melius, J.

    2013-05-01

    This report summarizes results of geographic information system screening for solar and wind potential at select Bureau of Reclamation lands in the western United States. The study included both utility-scale and facility-scale potential. This study supplements information in the report titled Renewable Energy Assessment for the Bureau of Reclamation: Final Report.

  13. 43 CFR 420.25 - Reclamation lands administered by other agencies.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... for management of Reclamation lands for recreation purposes. Specifically: (1) Reclamation lands managed by the National Park Service, the Bureau of Sport Fisheries and Wildlife, the Bureau of Land Management, the Forest Service, and other Federal agencies will be administered in accordance...

  14. 77 FR 5049 - Office of Surface Mining Reclamation and Enforcement; Notice of Proposed Information Collection...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-01

    ... Office of Surface Mining Reclamation and Enforcement; Notice of Proposed Information Collection for 1029-0103 AGENCY: Office of Surface Mining Reclamation and Enforcement, Interior. ACTION: Notice and request... Mining (OSM) is announcing its intention to renew its authority for the collection of information...

  15. 30 CFR 780.27 - Reclamation plan: Surface mining near underground mining.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., the application shall describe the measures to be used to comply with 30 CFR 816.79. ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Reclamation plan: Surface mining near underground mining. 780.27 Section 780.27 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION...

  16. 30 CFR 912.800 - General requirements for bonding of surface coal mining and reclamation operations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... coal mining and reclamation operations. 912.800 Section 912.800 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE IDAHO § 912.800 General requirements for bonding of surface coal mining...

  17. 30 CFR 912.800 - General requirements for bonding of surface coal mining and reclamation operations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... coal mining and reclamation operations. 912.800 Section 912.800 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE IDAHO § 912.800 General requirements for bonding of surface coal mining...

  18. 30 CFR 912.800 - General requirements for bonding of surface coal mining and reclamation operations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... coal mining and reclamation operations. 912.800 Section 912.800 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE IDAHO § 912.800 General requirements for bonding of surface coal mining...

  19. 30 CFR 912.800 - General requirements for bonding of surface coal mining and reclamation operations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false General requirements for bonding of surface coal mining and reclamation operations. 912.800 Section 912.800 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE IDAHO §...

  20. 30 CFR 912.800 - General requirements for bonding of surface coal mining and reclamation operations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... coal mining and reclamation operations. 912.800 Section 912.800 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE IDAHO § 912.800 General requirements for bonding of surface coal mining...

  1. Reclamation planning for abandoned mining subsidence lands in eastern China --- A case study

    SciTech Connect

    Zhenqi Hu; Hehe Gu

    1995-09-01

    China has a long history of coal mining and more than 96% of coal output is taken from underground mines each year. With the excavation of coal from underground, severe subsidence often results, which produces many subsidence lands. Since the Chinese government enacted a reclamation stipulation in 1989, many abandoned mining subsidence lands were produced before 1989. Therefore, reclamation of abandoned subsidence lands has become the focus of research activities in our country. This paper explores the principle and methods of reclamation planning for abandoned mining subsidence lands and presents a case study in eastern China. A 373 ha of abandoned mining subsidence land in Anhui province was selected as an experiment site. Since China is a developing country and land shortage is severe in this area, the high economic benefits from the reclaimed land was the final reclamation goal. Based on the topography of subsidence lands --- some parts of the abandoned lands were wetland or lake-like troughs, restoring farmlands and fishponds were chosen as post-reclamation land uses. The elevation of reclaimed lands was the key for restoring farmland successfully because of the high underground water level in this area, and the optimum fishpond size and side-slope design were the keys to reach high reclamation income. The HDP (Hydraulic Dredge Pump) reclamation technique was used for restoring farmland and creating fishpond. A farming and aquaculture plan for high economic benefits was also designed. This project will make farmers, who own the lands, richer through reclamation.

  2. 43 CFR 429.14 - What criteria will Reclamation consider when reviewing applications?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... when reviewing applications? 429.14 Section 429.14 Public Lands: Interior Regulations Relating to... § 429.14 What criteria will Reclamation consider when reviewing applications? Reclamation will consider the following criteria when reviewing applications: (a) Compatibility with authorized project...

  3. 43 CFR 422.10 - Requirements for authorizing officers to exercise Reclamation law enforcement authority.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Requirements for authorizing officers to exercise Reclamation law enforcement authority. 422.10 Section 422.10 Public Lands: Interior Regulations... exercise Reclamation law enforcement authority. (a) The CLEO must ensure that each officer receiving...

  4. 43 CFR 422.10 - Requirements for authorizing officers to exercise Reclamation law enforcement authority.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Requirements for authorizing officers to exercise Reclamation law enforcement authority. 422.10 Section 422.10 Public Lands: Interior Regulations... exercise Reclamation law enforcement authority. (a) The CLEO must ensure that each officer receiving...

  5. 43 CFR 422.10 - Requirements for authorizing officers to exercise Reclamation law enforcement authority.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Requirements for authorizing officers to exercise Reclamation law enforcement authority. 422.10 Section 422.10 Public Lands: Interior Regulations... exercise Reclamation law enforcement authority. (a) The CLEO must ensure that each officer receiving...

  6. 30 CFR 884.13 - Content of proposed State reclamation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... reclamation program, the Rural Abandoned Mine Program administered by the Soil Conservation Service, the...) Policies and procedures regarding land acquisition, management and disposal under 30 CFR part 879; (5) Policies and procedures regarding reclamation on private land under 30 CFR part 882; (6) Policies...

  7. 30 CFR 875.16 - Exclusion of certain noncoal reclamation sites.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    .... 875.16 Section 875.16 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT... the reclamation of sites and areas designated for remedial action under the Uranium Mill Tailings... Uranium Mill Tailings Radiation Control Act of 1978 (42 U.S.C. 7901 et seq.) or that have been listed...

  8. 30 CFR 933.800 - General requirements for bonding of surface coal mining and reclamation operations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false General requirements for bonding of surface coal mining and reclamation operations. 933.800 Section 933.800 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE NORTH CAROLINA...

  9. 30 CFR 942.800 - Bond and insurance requirements for surface coal mining and reclamation operations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Bond and insurance requirements for surface coal mining and reclamation operations. 942.800 Section 942.800 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE...

  10. 30 CFR 942.800 - Bond and insurance requirements for surface coal mining and reclamation operations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Bond and insurance requirements for surface coal mining and reclamation operations. 942.800 Section 942.800 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE...

  11. 30 CFR 921.800 - General requirements for bonding of surface coal mining and reclamation operations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... coal mining and reclamation operations. 921.800 Section 921.800 Mineral Resources OFFICE OF SURFACE... OPERATIONS WITHIN EACH STATE MASSACHUSETTS § 921.800 General requirements for bonding of surface coal mining... Mining and Reclamation Operations Under Regulatory Programs, shall apply to all surface coal mining...

  12. 30 CFR 933.800 - General requirements for bonding of surface coal mining and reclamation operations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... coal mining and reclamation operations. 933.800 Section 933.800 Mineral Resources OFFICE OF SURFACE... OPERATIONS WITHIN EACH STATE NORTH CAROLINA § 933.800 General requirements for bonding of surface coal mining... Mining and Reclamation Operations Under Regulatory Programs, shall apply to all surface coal mining...

  13. 30 CFR 937.800 - General requirements for bonding of surface coal mining and reclamation operations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... coal mining and reclamation operations. 937.800 Section 937.800 Mineral Resources OFFICE OF SURFACE... OPERATIONS WITHIN EACH STATE OREGON § 937.800 General requirements for bonding of surface coal mining and reclamation operations. Part 800 of this chapter, General Requirements for Bonding of Surface Coal Mining...

  14. 30 CFR 941.800 - General requirements for bonding of surface coal mining and reclamation operations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... coal mining and reclamation operations. 941.800 Section 941.800 Mineral Resources OFFICE OF SURFACE... OPERATIONS WITHIN EACH STATE SOUTH DAKOTA § 941.800 General requirements for bonding of surface coal mining... Mining and Reclamation Operations Under Regulatory Programs, shall apply to all surface coal mining...

  15. 30 CFR 910.800 - General requirements for bonding of surface coal mining and reclamation operations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... coal mining and reclamation operations. 910.800 Section 910.800 Mineral Resources OFFICE OF SURFACE... OPERATIONS WITHIN EACH STATE GEORGIA § 910.800 General requirements for bonding of surface coal mining and reclamation operations. Part 800 of this chapter, General Requirements for Bonding of Surface Coal Mining...

  16. 30 CFR 922.800 - General requirements for bonding of surface coal mining and reclamation operations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... coal mining and reclamation operations. 922.800 Section 922.800 Mineral Resources OFFICE OF SURFACE... OPERATIONS WITHIN EACH STATE MICHIGAN § 922.800 General requirements for bonding of surface coal mining and reclamation operations. Part 800 of this chapter, General Requirements for Bonding of Surface Coal Mining...

  17. 30 CFR 939.800 - General requirements for bonding of surface coal mining and reclamation operations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... coal mining and reclamation operations. 939.800 Section 939.800 Mineral Resources OFFICE OF SURFACE... OPERATIONS WITHIN EACH STATE RHODE ISLAND § 939.800 General requirements for bonding of surface coal mining... Mining and Reclamation Operations Under Regulatory Programs, shall apply to all surface coal mining...

  18. 30 CFR 785.12 - Special bituminous surface coal mining and reclamation operations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Special bituminous surface coal mining and... ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL....12 Special bituminous surface coal mining and reclamation operations. (a) This section applies to...

  19. 30 CFR 939.800 - General requirements for bonding of surface coal mining and reclamation operations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... coal mining and reclamation operations. 939.800 Section 939.800 Mineral Resources OFFICE OF SURFACE... OPERATIONS WITHIN EACH STATE RHODE ISLAND § 939.800 General requirements for bonding of surface coal mining... Mining and Reclamation Operations Under Regulatory Programs, shall apply to all surface coal mining...

  20. 30 CFR 941.800 - General requirements for bonding of surface coal mining and reclamation operations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... coal mining and reclamation operations. 941.800 Section 941.800 Mineral Resources OFFICE OF SURFACE... OPERATIONS WITHIN EACH STATE SOUTH DAKOTA § 941.800 General requirements for bonding of surface coal mining... Mining and Reclamation Operations Under Regulatory Programs, shall apply to all surface coal mining...

  1. 30 CFR 921.800 - General requirements for bonding of surface coal mining and reclamation operations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... coal mining and reclamation operations. 921.800 Section 921.800 Mineral Resources OFFICE OF SURFACE... OPERATIONS WITHIN EACH STATE MASSACHUSETTS § 921.800 General requirements for bonding of surface coal mining... Mining and Reclamation Operations Under Regulatory Programs, shall apply to all surface coal mining...

  2. 30 CFR 922.800 - General requirements for bonding of surface coal mining and reclamation operations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... coal mining and reclamation operations. 922.800 Section 922.800 Mineral Resources OFFICE OF SURFACE... OPERATIONS WITHIN EACH STATE MICHIGAN § 922.800 General requirements for bonding of surface coal mining and reclamation operations. Part 800 of this chapter, General Requirements for Bonding of Surface Coal Mining...

  3. 30 CFR 937.800 - General requirements for bonding of surface coal mining and reclamation operations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... coal mining and reclamation operations. 937.800 Section 937.800 Mineral Resources OFFICE OF SURFACE... OPERATIONS WITHIN EACH STATE OREGON § 937.800 General requirements for bonding of surface coal mining and reclamation operations. Part 800 of this chapter, General Requirements for Bonding of Surface Coal Mining...

  4. 30 CFR 942.800 - Bond and insurance requirements for surface coal mining and reclamation operations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... coal mining and reclamation operations. 942.800 Section 942.800 Mineral Resources OFFICE OF SURFACE... OPERATIONS WITHIN EACH STATE TENNESSEE § 942.800 Bond and insurance requirements for surface coal mining and... chapter, Bond and Insurance Requirements for Surface Coal Mining and Reclamation Operations...

  5. 30 CFR 933.800 - General requirements for bonding of surface coal mining and reclamation operations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... coal mining and reclamation operations. 933.800 Section 933.800 Mineral Resources OFFICE OF SURFACE... OPERATIONS WITHIN EACH STATE NORTH CAROLINA § 933.800 General requirements for bonding of surface coal mining... Mining and Reclamation Operations Under Regulatory Programs, shall apply to all surface coal mining...

  6. 30 CFR 921.800 - General requirements for bonding of surface coal mining and reclamation operations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... coal mining and reclamation operations. 921.800 Section 921.800 Mineral Resources OFFICE OF SURFACE... OPERATIONS WITHIN EACH STATE MASSACHUSETTS § 921.800 General requirements for bonding of surface coal mining... Mining and Reclamation Operations Under Regulatory Programs, shall apply to all surface coal mining...

  7. 30 CFR 910.800 - General requirements for bonding of surface coal mining and reclamation operations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... coal mining and reclamation operations. 910.800 Section 910.800 Mineral Resources OFFICE OF SURFACE... OPERATIONS WITHIN EACH STATE GEORGIA § 910.800 General requirements for bonding of surface coal mining and reclamation operations. Part 800 of this chapter, General Requirements for Bonding of Surface Coal Mining...

  8. 30 CFR 942.800 - Bond and insurance requirements for surface coal mining and reclamation operations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... coal mining and reclamation operations. 942.800 Section 942.800 Mineral Resources OFFICE OF SURFACE... OPERATIONS WITHIN EACH STATE TENNESSEE § 942.800 Bond and insurance requirements for surface coal mining and... chapter, Bond and Insurance Requirements for Surface Coal Mining and Reclamation Operations...

  9. 30 CFR 939.800 - General requirements for bonding of surface coal mining and reclamation operations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... coal mining and reclamation operations. 939.800 Section 939.800 Mineral Resources OFFICE OF SURFACE... OPERATIONS WITHIN EACH STATE RHODE ISLAND § 939.800 General requirements for bonding of surface coal mining... Mining and Reclamation Operations Under Regulatory Programs, shall apply to all surface coal mining...

  10. 30 CFR 922.800 - General requirements for bonding of surface coal mining and reclamation operations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... coal mining and reclamation operations. 922.800 Section 922.800 Mineral Resources OFFICE OF SURFACE... OPERATIONS WITHIN EACH STATE MICHIGAN § 922.800 General requirements for bonding of surface coal mining and reclamation operations. Part 800 of this chapter, General Requirements for Bonding of Surface Coal Mining...

  11. 30 CFR 933.800 - General requirements for bonding of surface coal mining and reclamation operations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... coal mining and reclamation operations. 933.800 Section 933.800 Mineral Resources OFFICE OF SURFACE... OPERATIONS WITHIN EACH STATE NORTH CAROLINA § 933.800 General requirements for bonding of surface coal mining... Mining and Reclamation Operations Under Regulatory Programs, shall apply to all surface coal mining...

  12. 30 CFR 937.800 - General requirements for bonding of surface coal mining and reclamation operations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... coal mining and reclamation operations. 937.800 Section 937.800 Mineral Resources OFFICE OF SURFACE... OPERATIONS WITHIN EACH STATE OREGON § 937.800 General requirements for bonding of surface coal mining and reclamation operations. Part 800 of this chapter, General Requirements for Bonding of Surface Coal Mining...

  13. 30 CFR 910.800 - General requirements for bonding of surface coal mining and reclamation operations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... coal mining and reclamation operations. 910.800 Section 910.800 Mineral Resources OFFICE OF SURFACE... OPERATIONS WITHIN EACH STATE GEORGIA § 910.800 General requirements for bonding of surface coal mining and reclamation operations. Part 800 of this chapter, General Requirements for Bonding of Surface Coal Mining...

  14. 30 CFR 935.25 - Approval of Ohio abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Plan to provide for the reclamation of areas causing acid mine drainage AMD and to revise the project... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Approval of Ohio abandoned mine land... STATE OHIO § 935.25 Approval of Ohio abandoned mine land reclamation plan amendments. The following is...

  15. 30 CFR 935.25 - Approval of Ohio abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Plan to provide for the reclamation of areas causing acid mine drainage AMD and to revise the project... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Approval of Ohio abandoned mine land... STATE OHIO § 935.25 Approval of Ohio abandoned mine land reclamation plan amendments. The following is...

  16. 30 CFR 935.25 - Approval of Ohio abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Plan to provide for the reclamation of areas causing acid mine drainage AMD and to revise the project... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Approval of Ohio abandoned mine land... STATE OHIO § 935.25 Approval of Ohio abandoned mine land reclamation plan amendments. The following is...

  17. 30 CFR 935.25 - Approval of Ohio abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Plan to provide for the reclamation of areas causing acid mine drainage AMD and to revise the project... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Approval of Ohio abandoned mine land... STATE OHIO § 935.25 Approval of Ohio abandoned mine land reclamation plan amendments. The following is...

  18. Reclamation and the Red Man: Relationships on the Truckee-Carson Project, Nevada

    ERIC Educational Resources Information Center

    Townley, John M.

    1978-01-01

    Four years after selection of the Western Nevada area for development as a federally-administered reclamation project, and but a single full season of farming, the Indian situation had assumed problem proportions to the Reclamation Service and the Truckee-Carson Project. (NQ)

  19. Considerations in the development of incidental reclamation concepts for an extensively mined watershed

    SciTech Connect

    Bender, J.; McCann, M.

    1982-12-01

    This paper deals with environmental effects caused by extensive coal mining in the North Fork watershed of the Pound River of Virginia, and plans for reclamation of these abandoned sites. The study plan is outlined for determining the current environmental problems in this steep slope area. Ideas for alternative mining practices for incidental coal removal during this reclamation process is also discussed.

  20. 30 CFR 938.20 - Approval of Pennsylvania abandoned mine land reclamation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Approval of Pennsylvania abandoned mine land... PENNSYLVANIA § 938.20 Approval of Pennsylvania abandoned mine land reclamation plan. The Pennsylvania Abandoned Mine Land Reclamation Plan as submitted on November 3, 1980, is approved. Copies of the approved...

  1. 30 CFR 941.800 - General requirements for bonding of surface coal mining and reclamation operations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false General requirements for bonding of surface coal mining and reclamation operations. 941.800 Section 941.800 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE SOUTH DAKOTA §...

  2. 51. Photographic copy of construction drawing, U.S. Reclamation Service, August ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    51. Photographic copy of construction drawing, U.S. Reclamation Service, August 1906 (original drawing located at U.S. Bureau of Reclamation Upper Columbia Area Office, Yakima, Washington). "Crib dam at Lake Keechelus." - Keechelus Dam, Yakima River, 10 miles northwest of Easton, Easton, Kittitas County, WA

  3. Student Responses to the Women's Reclamation Work in the Philosophy of Education

    ERIC Educational Resources Information Center

    Wojcik, Teresa Genevieve; Titone, Connie

    2013-01-01

    Reclamation work denotes the process of uncovering the lost contributions of women to the philosophy of education, analyzing their works, making them accessible to a larger audience, and (re)introducing them to the historical record and canon. Since the 1970s, scholars have been engaged in the reclamation work, thus making available to students,…

  4. Aluminum reclamation from dross. (Latest citations from the Aluminum Industry Abstracts database). Published Search

    SciTech Connect

    1996-06-01

    The bibliography contains citations concerning aluminum reclamation from dross. Topics include dross treatment technology, the environmental benefits of aluminum recovery from dross, and the economics of aluminum reclamation in dross processing systems. (Contains 50-250 citations and includes a subject term index and title list.) (Copyright NERAC, Inc. 1995)

  5. Placebo: the lie that comes true?

    PubMed

    Justman, Stewart

    2013-04-01

    Over the decades of experimentation on the placebo effect, it has become clear that it is driven largely by expectation, and that strong expectations of efficacy are more likely to give rise to the experience of benefit. No wonder the placebo effect has come to resemble a self-fulfilling prophecy. However, this resemblance is considerably exaggerated. The placebo effect does not work as strongly as it is advertised to do in some efforts to elicit it. Half-truths about the placebo effect are now in circulation, reinforced by a number of other equivocations that it seems to attract. As the deceptive use of placebos has fallen into discredit, the use of half-truths and exaggerations-neither of which is technically a deception-becomes an ever more inviting possibility. However, there are risks and costs associated with the half-truth that the doctor possesses the power to make his or her words come true by the alchemy of the placebo effect. PMID:23250230

  6. True Aneurysm of the Proximal Brachial Artery

    PubMed Central

    Ramakrishna, Pinjala; Mahapatra, Sandeep; Rajesh, Ratna

    2013-01-01

    A 35-year-old farmer presented with complaints of pain in the right upper limb for 1 month and bluish discoloration of the right-hand finger tips with tingling and numbness. He sustained injury to the right upper limb while lifting a heavy object 1 mo previously. There was an ovoid swelling of 4 × 2 cm on the medial aspect of the right arm, 12 cm above the medial epicondyle at the level of the armpit with visible pulsations. There was distal neurovascular deficit. Duplex scan of the right upper limb arterial system revealed a pseudoaneurysm of the proximal right brachial artery, with dampened monophasic flow in the ulnar artery and no flow in the radial artery. Spiral computed tomography angiogram showed the presence of an echogenic periarterial lesion in the proximal brachial artery suggestive of pseudoaneurysm or an extrinsic compression by hematoma. Distal brachial artery was found to have filled with thrombus, with non-opacification of the radial and the distal ulnar artery. The patient was posted for excision of the aneurysmal arterial segment. A 5-cm-long reversed segment of vein graft was interposed in between the cut ends of the brachial artery. Histopathology: Specimen shows a part of the vessel wall composed of intimal, medial, and adventitial layers with intraluminal thrombus showing evidence of recanalization suggestive of true aneurysm of the brachial artery. PMID:26798692

  7. True Color of Jupiter's Great Red Spot

    NASA Technical Reports Server (NTRS)

    1996-01-01

    Roughly true color image of the Great Red Spot of Jupiter as taken by the Galileo imaging system on June 26, 1996. Because the Galileo imaging system's wavelength sensitivities go beyond those of the human eye, this is only an approximation of what a human observer would have seen in place of the Galileo spacecraft. To simulate red as our eyes see it, the near-infrared filter (756 nm) image was used. To simulate blue as our eyes see it, the violet filter (410 nm) image was used. Finally, to simulate green as our eyes see it, a combination of 2/3 violet and 1/3 near-infrared was used. The result is an image that is similar in color to that seen when looking through a telescope at Jupiter with your eye, but allowing detail about 100 times finer to be visible! The Jet Propulsion Laboratory, Pasadena, CA manages the mission for NASA's Office of Space Science, Washington, DC. This image and other images and data received from Galileo are posted on the World Wide Web, on the Galileo mission home page at URL http://galileo.jpl.nasa.gov. Background information and educational context for the images can be found at URL http://www.jpl.nasa.gov/galileo/sepo

  8. Mechanisms for oscillatory true polar wander.

    PubMed

    Creveling, J R; Mitrovica, J X; Chan, N-H; Latychev, K; Matsuyama, I

    2012-11-01

    Palaeomagnetic studies of Palaeoproterozoic to Cretaceous rocks propose a suite of large and relatively rapid (tens of degrees over 10 to 100 million years) excursions of the rotation pole relative to the surface geography, or true polar wander (TPW). These excursions may be linked in an oscillatory, approximately coaxial succession about the centre of the contemporaneous supercontinent. Within the framework of a standard rotational theory, in which a delayed viscous adjustment of the rotational bulge acts to stabilize the rotation axis, geodynamic models for oscillatory TPW generally appeal to consecutive, opposite loading phases of comparable magnitude. Here we extend a nonlinear rotational stability theory to incorporate the stabilizing effect of TPW-induced elastic stresses in the lithosphere. We demonstrate that convectively driven inertia perturbations acting on a nearly prolate, non-hydrostatic Earth with an effective elastic lithospheric thickness of about 10 kilometres yield oscillatory TPW paths consistent with palaeomagnetic inferences. This estimate of elastic thickness can be reduced, even to zero, if the rotation axis is stabilized by long-term excess ellipticity in the plane of the TPW. We speculate that these sources of stabilization, acting on TPW driven by a time-varying mantle flow field, provide a mechanism for linking the distinct, oscillatory TPW events of the past few billion years. PMID:23135471

  9. Shoreline Delineation and Land Reclamation Change Detection Using Landsat Image

    NASA Astrophysics Data System (ADS)

    Rosli, M. I.; Ahmad, M. A.; Kaamin, M.; Izhar, M. F. N.

    2016-07-01

    This study is conducted on the usage of remote sensing images from several different years in order to analyze the changes of shoreline and land cover of the area. Remote sensing images used in this study are the data captured by the Landsat satellite. The images are projecting the land surface in 30 by 30 meter resolution and it is processed by the ENVI software. ENVI is able to change each digital number of the pixels on the images into specific value according to the applied model for classification in which could be used as an approach in calculating the area different classes based from the images itself. Therefore, using this method, the changes on the coastal area are possible to be determined. Analysis of the shoreline and land reclamation around the coastal area is integrated with the land use changes to determine its impact. The study shows that Batu Pahat area might have undergone land reclamation whereas in Pasir Gudang is experiencing substantial amount of erosion. Besides, the changes of land use in both areas were considered to be rapid and due to the results obtained from this study, the issues may be brought about for the local authority awareness action.

  10. Wastewater reclamation and reuse in China: Opportunities and challenges.

    PubMed

    Lyu, Sidan; Chen, Weiping; Zhang, Weiling; Fan, Yupeng; Jiao, Wentao

    2016-01-01

    The growing water stress both in terms of water scarcity and quality deterioration promotes the development of reclaimed water as a new water resource use. This paper reviewed wastewater reuse practices in China, and the opportunities and challenges of expanding reclaimed water use were analyzed. Rapid urbanization with the increasing of water demand and wastewater discharge provides an opportunity for wastewater reuse. The vast amount of wastewater discharge and low reclaimed water production mean that wastewater reuse still has a great potential in China. Many environmental and economic benefits and successful reclamation technologies also provide opportunities for wastewater reuse. In addition, the overall strategy in China is also encouraging for wastewater reuse. In the beginning stage of wastewater reclamation and reuse, there are many significant challenges to expand wastewater reuse in China including slow pace in adopting urban wastewater reuse programs, the establishment of integrated water resources management framework and guidelines for wastewater reuse programs, incoherent water quality requirements, the limited commercial development of reclaimed water and the strengthening of public awareness and cooperation among stakeholders. PMID:26899648

  11. Use of Frankia and Actinorhizal Plants for Degraded Lands Reclamation

    PubMed Central

    Diagne, Nathalie; Ngom, Mariama; Nambiar-Veetil, Mathish; Franche, Claudine; Narayanan, Krishna Kumar; Laplaze, Laurent

    2013-01-01

    Degraded lands are defined by soils that have lost primary productivity due to abiotic or biotic stresses. Among the abiotic stresses, drought, salinity, and heavy metals are the main threats in tropical areas. These stresses affect plant growth and reduce their productivity. Nitrogen-fixing plants such as actinorhizal species that are able to grow in poor and disturbed soils are widely planted for the reclamation of such degraded lands. It has been reported that association of soil microbes especially the nitrogen-fixing bacteria Frankia with these actinorhizal plants can mitigate the adverse effects of abiotic and biotic stresses. Inoculation of actinorhizal plants with Frankia significantly improves plant growth, biomass, shoot and root N content, and survival rate after transplanting in fields. However, the success of establishment of actinorhizal plantation in degraded sites depends upon the choice of effective strains of Frankia. Studies related to the beneficial role of Frankia on the establishment of actinorhizal plants in degraded soils are scarce. In this review, we describe some examples of the use of Frankia inoculation to improve actinorhizal plant performances in harsh conditions for reclamation of degraded lands. PMID:24350296

  12. Tertiary treatment using microfiltration and UV disinfection for water reclamation

    SciTech Connect

    Jolis, D.; Hirano, R.; Pitt, P.

    1999-03-01

    Microfiltration and UV disinfection are two alternative technologies for water reclamation. The results of a pilot study combining these two processes are presented. In addition to producing filtrate turbidites averaging 0.06 nephelometric turbidity units, microfiltration was an effective barrier to pathogens, demonstrating average log reductions of 4.5 for total coliforms and 2.9 for MS2 bacteriophage. Ultraviolet disinfection following microfiltration reliably met the California Wastewater Reclamation Criteria (Title 22) total coliform standard of 2.2 colony-forming units/100 mL at a UV dose of 450 J/m{sup 2}. The MS2 bacteriophage standard, which requires a 5-log reduction, was achieved by microfiltration and a UV dose of 880 J/m{sup 2}. A model of the kinetics of inactivation of MS2 bacteriophage was used in further analysis of disinfection data. The model indicated that considerable backmixing occurred in the pilot UV disinfection unit, and observed UV doses could be reduced with improved hydraulics.

  13. Bacterial Functional Redundancy along a Soil Reclamation Gradient

    PubMed Central

    Yin, Bei; Crowley, David; Sparovek, Gerd; De Melo, Wanderley Jose; Borneman, James

    2000-01-01

    A strategy to measure bacterial functional redundancy was developed and tested with soils collected along a soil reclamation gradient by determining the richness and diversity of bacterial groups capable of in situ growth on selected carbon substrates. Soil cores were collected from four sites along a transect from the Jamari tin mine site in the Jamari National Forest, Rondonia, RO, Brazil: denuded mine spoil, soil from below the canopy of invading pioneer trees, revegetated soil under new growth on the forest edge, and the forest floor of an adjacent preserved forest. Bacterial population responses were analyzed by amending these soil samples with individual carbon substrates in the presence of bromodeoxyuridine (BrdU). BrdU-labeled DNA was then subjected to a 16S-23S rRNA intergenic analysis to depict the actively growing bacteria from each site. The number and diversity of bacterial groups responding to four carbon substrates (l-serine, l-threonine, sodium citrate, and α-lactose hydrate) increased along the reclamation-vegetation gradient such that the preserved forest soil samples contained the highest functional redundancy for each substrate. These data suggest that bacterial functional redundancy increases in relation to the regrowth of plant communities and may therefore represent an important aspect of the restoration of soil biological functionality to reclaimed mine spoils. They also suggest that bacterial functional redundancy may be a useful indicator of soil quality and ecosystem functioning. PMID:11010883

  14. Lead poisoning among battery reclamation workers in Alabama.

    PubMed

    Gittleman, J L; Engelgau, M M; Shaw, J; Wille, K K; Seligman, P J

    1994-05-01

    Lead exposures were evaluated at a battery reclamation facility in Alabama. A questionnaire obtained work and health information. Medical tests included blood lead, zinc protoporphyrin, hematocrit, creatinine, blood urea nitrogen, and uric acid. An investigation of workers' family members and neighborhood residents was conducted. Fourteen of 15 workers had blood lead levels greater than 50 micrograms/dL. Zinc protoporphyrin was > 79 micrograms/dL in 14 workers. Four workers had hematocrit < 40%; six had elevated serum creatinine (> 1.3 mg/dL). Workers' blood lead levels increased significantly over 2 years (beta = 1.004 micrograms/dL per month). Ten workers had elevated air lead levels. Twelve of 16 employee children had blood lead levels > 10 micrograms/dL; 3 were greater than 40 micrograms/dL. Workers' children had significantly higher blood lead levels than did neighborhood comparison children. Reclamation of lead batteries unaccompanied by smelting poses a health hazard to workers and their children. PMID:8027877

  15. Reclamation system design of nanostructured coatings of touch-panel.

    PubMed

    Pa, P S

    2010-02-01

    A newly design reclamation system using an ultrasonic micro electroetching (UMECE) as a machining process for Indium-tin-oxide(ITO) nanostructured coatings dissolved from a surface of polyethyleneterephthalate (PET) of touch-panel is presented. The design features of the reclamation mechanism and a designed wedge-form tool are of major interest. The low yield of ITO nanostructured coatings is an important factor in optoelectronic semiconductor production. In the current experiment, a small diameter of the anode accompanying with a small distance between the two anodes, reduced the amount of time for effective ultrasonic micro electroetching of ITO since the effect of removal is facilitated by supplying sufficient electrochemical power. The performance of ultrasonics was found to be more effective than pulsed current, requiring no increase in electric power. Additionally, electric power, when combined with a fast feed rate, provides highly effective dissolution. Higher frequency or the greater power of ultrasonics corresponds to a higher dissolution rate for ITO nanostructured coatings. A small anode of the wedge-form tool or a small size of the cathode takes less time for the same amount of ITO removal. Importantly, ultrasonic micro electroetching with the designed wedge-form tool requires only a short period of time to dissolve the ITO's nanostructured coatings easily and cleanly. PMID:20352803

  16. Use of Frankia and actinorhizal plants for degraded lands reclamation.

    PubMed

    Diagne, Nathalie; Arumugam, Karthikeyan; Ngom, Mariama; Nambiar-Veetil, Mathish; Franche, Claudine; Narayanan, Krishna Kumar; Laplaze, Laurent

    2013-01-01

    Degraded lands are defined by soils that have lost primary productivity due to abiotic or biotic stresses. Among the abiotic stresses, drought, salinity, and heavy metals are the main threats in tropical areas. These stresses affect plant growth and reduce their productivity. Nitrogen-fixing plants such as actinorhizal species that are able to grow in poor and disturbed soils are widely planted for the reclamation of such degraded lands. It has been reported that association of soil microbes especially the nitrogen-fixing bacteria Frankia with these actinorhizal plants can mitigate the adverse effects of abiotic and biotic stresses. Inoculation of actinorhizal plants with Frankia significantly improves plant growth, biomass, shoot and root N content, and survival rate after transplanting in fields. However, the success of establishment of actinorhizal plantation in degraded sites depends upon the choice of effective strains of Frankia. Studies related to the beneficial role of Frankia on the establishment of actinorhizal plants in degraded soils are scarce. In this review, we describe some examples of the use of Frankia inoculation to improve actinorhizal plant performances in harsh conditions for reclamation of degraded lands. PMID:24350296

  17. History of reclamation: the times - they are a changin'

    SciTech Connect

    Cardwell, S.P.; Sanz, L.O.

    1985-12-09

    Surface mining in Kentucky and the US has risen from rather sporadic beginnings in the late 1800's to a full fledged, heavily regulated industry in the 1980's. The industry has undergone a more traumatic regulatory metamorphosis in the past twenty-five years than any other single industry in the US. Reclamation requirements have gone from supplying a simple mine registration with the appropriate agency immediately prior to beginning operations to spending as much as 18-24 months collecting data for what amounts to a mini-environmental impact statement which must be submitted as part of a lengthy application several months prior to actual start-up of the operation itself. Increasingly stringent laws have been the result of two main forces: (1) Increasing citizen concern to save the environment and (2) Increasingly efficient technology which can both mine more coal (and as a result disturb more ground). This paper will follow the evolution of the coal mining and reclamation industry, from its beginning in the late nineteenth century when surface mining was conducted with a pick-and-shovel and a mule-drawn scraper to the present day, when a 100 cu.yd. stripping shovel is almost commonplace. Particular attention will be given to the relationship between the evolving technology and the increasingly stringent laws. 33 references.

  18. Abandoned mined land reclamation on the Wayne National Forest - an interdisciplinary approach

    SciTech Connect

    Moss, R.G.

    1982-12-01

    The Wayne National Forest contains several thousand acres of abandoned surface-mined lands, many of which are in need of reclamation. The Forest Service has developed a systematic interdisciplinary approach to planning and implementing reclamation projects. An environmental assessment report is prepared before the project is designed which provides decision makers the information needed to select a preferred reclamation alternative. A case study known as the Yost II Abandoned Mined Land Reclamation Project is presented. The abandoned mine, basically a double contour configuration, presented designers with a difficult mosaic of barren, toxic areas, well-revegetated areas, and acid ponds. The reclamation technique employed utilized burial of toxic soil, pond underdrains, crushed limestone filter strips, and topsoiling.

  19. The true value of the TRUE Test for allergic contact dermatitis.

    PubMed

    Fischer, T; Kreilgård, B; Maibach, H I

    2001-07-01

    The development of the thin layer rapid use epicutaneous (TRUE) Test is a history of cooperation between scientists from academia and industry covering several disciplines: medicine, pharmaceutical chemistry, pharmacology, and statistics. The TRUE Test is today a patch test system with documented stability and allergen content. Allergens are incorporated in a dried-in-gel vehicle, which is coated onto a polyester backing to form a patch. Applied to the skin, the allergens are released when the gel becomes moisturized by transepidermal water. This may seem to be a simple technique, but its development required laborious research and solutions to stability and dosage problems. The test has been clinically standardized with serial dilution tests on sensitized patients and validated in comparative multicenter tests. The test is a significant step towards higher reliability of patch testing. Fifteen years of experience and critical investigations are discussed in this article, as are possible improvements such as expansion of the test with new allergens. PMID:11892053

  20. Achieving true sustainability of zoo populations.

    PubMed

    Lacy, Robert C

    2013-01-01

    For the last 30 years, cooperative management of irreplaceable animal populations in zoos and aquariums has focused primarily on the goal of minimizing genetic decay within defined time frames, and large advances have been made in technologies to optimize genetic management of closed populations. However, recent analyses have shown that most zoo programs are not projected to meet their stated goals. This has been described as a lack of achieving "sustainability" of the populations, yet by definition a goal of managed decay is not a plan for sustainability. True sustainability requires management of the resource in manner that does not deplete its value for the future. Achieving such sustainability for many managed populations may require changing from managing isolated populations to managing populations that are part of a broader metapopulation, with carefully considered exchange between populations across a spectrum of ex situ to in situ. Managing zoo populations as components of comprehensive conservation strategies for the species will require research on determinants of various kinds of genetic, physiological, behavioral, and morphological variation and their roles in population viability, development of an array of management techniques and tools, training of population managers in metapopulation management and integrated conservation planning, and projections of impacts of management strategies on the viability of the captive populations and all populations that are interactively managed or affected. Such a shift in goals and methods would result in zoo population management being an ongoing part of species conservation rather than short-term or isolated from species conservation. Zoo Biol. 32:19-26, 2013. © 2012 Wiley Periodicals, Inc. PMID:22753040

  1. True reference nanosensor realized with silicon nanowires.

    PubMed

    Tarasov, A; Wipf, M; Bedner, K; Kurz, J; Fu, W; Guzenko, V A; Knopfmacher, O; Stoop, R L; Calame, M; Schönenberger, C

    2012-06-26

    Conventional gate oxide layers (e.g., SiO(2), Al(2)O(3), or HfO(2)) in silicon field-effect transistors (FETs) provide highly active surfaces, which can be exploited for electronic pH sensing. Recently, great progress has been achieved in pH sensing using compact integrateable nanowire FETs. However, it has turned out to be much harder to realize a true reference electrode, which--while sensing the electrostatic potential--does not respond to the proton concentration. In this work, we demonstrate a highly effective reference sensor, a so-called reference FET, whose proton sensitivity is suppressed by as much as 2 orders of magnitude. To do so, the Al(2)O(3) surface of a nanowire FET was passivated with a self-assembled monolayer of silanes with a long alkyl chain. We have found that a full passivation can be achieved only after an extended period of self-assembling lasting several days at 80 °C. We use this slow process to measure the number of active proton binding sites as a function of time by a quantitative comparison of the measured nonlinear pH-sensitivities to a theoretical model (site-binding model). Furthermore, we have found that a partially passivated surface can sense small changes in the number of active binding sites reaching a detection limit of δN(s) ≈ 170 μm(-2) Hz(-1/2) at 10 Hz and pH 3. PMID:22631046

  2. 43 CFR 404.26 - Must an appraisal investigation be completed before I can request Reclamation to review a...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... completed before I can request Reclamation to review a feasibility study that was not completed under this... appraisal investigation be completed before I can request Reclamation to review a feasibility study that was... prepare an appraisal report recommending that a feasibility study be conducted before Reclamation...

  3. 43 CFR 404.50 - What information will be included in the feasibility report prepared by Reclamation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false What information will be included in the feasibility report prepared by Reclamation. 404.50 Section 404.50 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Feasibility Studies § 404.50...

  4. 43 CFR 404.33 - How much Federal funding can Reclamation provide for the completion of a feasibility study?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false How much Federal funding can Reclamation provide for the completion of a feasibility study? 404.33 Section 404.33 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Cost-Sharing § 404.33...

  5. 43 CFR 404.26 - Must an appraisal investigation be completed before I can request Reclamation to review a...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... completed before I can request Reclamation to review a feasibility study that was not completed under this... appraisal investigation be completed before I can request Reclamation to review a feasibility study that was... prepare an appraisal report recommending that a feasibility study be conducted before Reclamation...

  6. 43 CFR 404.14 - How will Reclamation provide notice of opportunities for assistance under the program?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false How will Reclamation provide notice of opportunities for assistance under the program? 404.14 Section 404.14 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.14 How...

  7. 43 CFR 404.27 - How will Reclamation evaluate my request to review an appraisal investigation or feasibility...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false How will Reclamation evaluate my request to review an appraisal investigation or feasibility study completed without the support of Reclamation? 404.27 Section 404.27 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR...

  8. 43 CFR 404.25 - How can I request Reclamation to review an appraisal investigation or feasibility study that was...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false How can I request Reclamation to review an appraisal investigation or feasibility study that was not completed under this program? 404.25 Section 404.25 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL...

  9. 43 CFR 404.43 - What process will Reclamation follow to determine if an appraisal investigation is ready for review?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false What process will Reclamation follow to determine if an appraisal investigation is ready for review? 404.43 Section 404.43 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM...

  10. 43 CFR 404.23 - How will Reclamation determine whether you or your contractor is qualified to conduct an...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false How will Reclamation determine whether you or your contractor is qualified to conduct an appraisal investigation or a feasibility study? 404.23 Section 404.23 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL...

  11. 43 CFR 404.48 - What process will Reclamation follow to determine if a feasibility study is ready for review?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false What process will Reclamation follow to determine if a feasibility study is ready for review? 404.48 Section 404.48 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Feasibility Studies...

  12. 43 CFR 404.26 - Must an appraisal investigation be completed before I can request Reclamation to review a...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... completed before I can request Reclamation to review a feasibility study that was not completed under this... appraisal investigation be completed before I can request Reclamation to review a feasibility study that was... prepare an appraisal report recommending that a feasibility study be conducted before Reclamation...

  13. 43 CFR 404.49 - What criteria will Reclamation use to determine whether to recommend that a proposed rural water...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... determine whether to recommend that a proposed rural water supply project be authorized for construction... RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Feasibility Studies § 404.49 What criteria will Reclamation use to determine whether to recommend that a proposed rural water...

  14. 43 CFR 404.14 - How will Reclamation provide notice of opportunities for assistance under the program?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false How will Reclamation provide notice of opportunities for assistance under the program? 404.14 Section 404.14 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER...

  15. 43 CFR 404.44 - What criteria will Reclamation apply to determine whether it is appropriate to recommend that a...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false What criteria will Reclamation apply to determine whether it is appropriate to recommend that a feasibility study be conducted? 404.44 Section 404.44 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER...

  16. 43 CFR 404.12 - Can Reclamation provide assistance with the construction of a rural water supply project under...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Can Reclamation provide assistance with the construction of a rural water supply project under this program? 404.12 Section 404.12 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview...

  17. 43 CFR 404.37 - How will Reclamation determine the appropriate non-Federal share of construction costs?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false How will Reclamation determine the appropriate non-Federal share of construction costs? 404.37 Section 404.37 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER...

  18. 75 FR 15458 - Request for Small Reclamation Projects Act Loan To Construct Narrows Dam in Sanpete County, UT

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-29

    ... 25, 2003 (68 FR 66123-66124). The SDEIS describes and analyzes the potential effects of three action... Bureau of Reclamation Request for Small Reclamation Projects Act Loan To Construct Narrows Dam in Sanpete... law. These Reclamation actions would facilitate the construction by SWCD of the proposed Narrows...

  19. 43 CFR 404.30 - How much Federal funding can Reclamation provide for the completion of an appraisal investigation?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... provide for the completion of an appraisal investigation? 404.30 Section 404.30 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER... of an appraisal investigation? In general, Reclamation will be responsible for 100 percent of...

  20. 43 CFR 404.30 - How much Federal funding can Reclamation provide for the completion of an appraisal investigation?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... provide for the completion of an appraisal investigation? 404.30 Section 404.30 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER... of an appraisal investigation? In general, Reclamation will be responsible for 100 percent of...

  1. 43 CFR 404.30 - How much Federal funding can Reclamation provide for the completion of an appraisal investigation?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... provide for the completion of an appraisal investigation? 404.30 Section 404.30 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER... of an appraisal investigation? In general, Reclamation will be responsible for 100 percent of...

  2. 43 CFR 404.32 - Can Reclamation reduce the non-Federal cost-share required for an appraisal investigation?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER... appraisal investigation? Yes. Reclamation may reduce the non-Federal cost-share for appraisal investigations... overwhelming Federal interest in conducting the appraisal investigation, and you demonstrate financial...

  3. 43 CFR 404.32 - Can Reclamation reduce the non-Federal cost-share required for an appraisal investigation?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY... investigation? Yes. Reclamation may reduce the non-Federal cost-share for appraisal investigations below 50... Federal interest in conducting the appraisal investigation, and you demonstrate financial...

  4. 43 CFR 404.32 - Can Reclamation reduce the non-Federal cost-share required for an appraisal investigation?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER... appraisal investigation? Yes. Reclamation may reduce the non-Federal cost-share for appraisal investigations... overwhelming Federal interest in conducting the appraisal investigation, and you demonstrate financial...

  5. 43 CFR 404.32 - Can Reclamation reduce the non-Federal cost-share required for an appraisal investigation?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER... appraisal investigation? Yes. Reclamation may reduce the non-Federal cost-share for appraisal investigations... overwhelming Federal interest in conducting the appraisal investigation, and you demonstrate financial...

  6. 43 CFR 404.30 - How much Federal funding can Reclamation provide for the completion of an appraisal investigation?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... provide for the completion of an appraisal investigation? 404.30 Section 404.30 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER... of an appraisal investigation? In general, Reclamation will be responsible for 100 percent of...

  7. 30 CFR 785.19 - Surface coal mining and reclamation operations on areas or adjacent to areas including alluvial...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Surface coal mining and reclamation operations... the 100th meridian. 785.19 Section 785.19 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND...

  8. 30 CFR 942.20 - Approval of Tennessee reclamation plan for lands and waters affected by past coal mining.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Approval of Tennessee reclamation plan for... OPERATIONS WITHIN EACH STATE TENNESSEE § 942.20 Approval of Tennessee reclamation plan for lands and waters affected by past coal mining. The Tennessee Reclamation Plan, as submitted on March 24, 1982, is...

  9. 30 CFR 942.20 - Approval of Tennessee reclamation plan for lands and waters affected by past coal mining.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Approval of Tennessee reclamation plan for... OPERATIONS WITHIN EACH STATE TENNESSEE § 942.20 Approval of Tennessee reclamation plan for lands and waters affected by past coal mining. The Tennessee Reclamation Plan, as submitted on March 24, 1982, is...

  10. 30 CFR 942.20 - Approval of Tennessee reclamation plan for lands and waters affected by past coal mining.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Approval of Tennessee reclamation plan for... OPERATIONS WITHIN EACH STATE TENNESSEE § 942.20 Approval of Tennessee reclamation plan for lands and waters affected by past coal mining. The Tennessee Reclamation Plan, as submitted on March 24, 1982, is...

  11. Remote Sensing Applications to the Pennsylvania Abandoned Mine Reclamation Program

    NASA Technical Reports Server (NTRS)

    Clemens, E.; Warnick, L.

    1982-01-01

    Pennsylvania Abandoned Mine Land Inventory demonstrated the effective use of remote sensing techniques within the context of the Surface Mining Control and Reclamation Act of 1977. The inventory combined data from field work, a literature search, and photointerpretation to fulfill both State and Federal requirements. A primary project objective was to accurately identify and map all surface features and disturbances from abandoned surface and underground mining. Black-and-white aerial photographs were used to record pits, contour benches, highwalls, spoil material, graded and recontoured areas, impounded water, and serious erosion and slide prone areas. In addition, vegetation cover estimates and surrounding land uses were noted. The inventory data base provides Pennsylvania with a valuable resource management tool that should be systematically updated. The utilization of remotely sensed data from SPOT or LANDSAT-D satellites may prove valuable in the anticipated updating and monitoring of the Pennsylvania AML inventory over the next several years.

  12. Overview of Reclamation's geothermal program in Imperial Valley, California

    NASA Technical Reports Server (NTRS)

    Fulcher, M. K.

    1974-01-01

    The Bureau of Reclamation is presently involved in a unique Geothermal Resource Development Program in Imperial Valley, California. The main purpose of the investigations is to determine the feasibility of providing a source of fresh water through desalting geothermal fluids stored in the aquifers underlying the valley. Significant progress in this research and development stage to date includes extensive geophysical investigations and the drilling of five geothermal wells on the Mesa anomaly. Four of the wells are for production and monitoring the anomaly, and one will be used for reinjection of waste brines from the desalting units. Two desalting units, a multistage flash unit and a vertical tube evaporator unit, have been erected at the East Mesa test site. The units have been operated on shakedown and continuous runs and have produced substantial quantities of high-quality water.

  13. Qualification of the Reclamation Welding Parameters for 316 CRES Stems

    SciTech Connect

    Howard, S.R.; McKinney, G.J.

    1997-09-01

    A demonstration was performed to prove the acceptability of using existing reclamation weld parameters for joining a new fill stem made of 316 Corrosion Resistant Stainless Steel (CRES) to a 304L stainless steel vessel. Previously qualified weld parameters are for welding the old 0.275`` diameter stem of 304L stainless steel to a 304L vessel. The weld quality acceptance criteria included leak rate, proof test, burst strength and evaluation by metallography. All tests and examinations indicated that welds made within the demonstrated parameters met all requirements. The results from this work demonstrate that the welding of 316 CRES 0.275`` diameter stems can be successfully performed using the same weld parameters as those for 304L stems.

  14. Wash water reclamation technology for advanced manned spacecraft

    NASA Technical Reports Server (NTRS)

    Putnam, D. F.

    1977-01-01

    The results of an analytical study and assessment of state-of-the-art wash water reclamation technology for advanced manned spacecraft is presented. All non-phase-change unit operations, unit processes, and subsystems currently under development by NASA are considered. Included among these are: filtration, ultrafiltration, carbon adsorption, ion exchange, chemical pretreatment, reverse osmosis, hyperfiltration, and certain urea removal techniques. Performance data are given together with the projected weights and sizes of key components and subsystems. In the final assessment, a simple multifiltration approach consisting of surface-type cartridge filters, carbon adsorption and ion exchange resins receives the highest rating for six-man orbital missions of up to 10 years in duration.

  15. The use of geographical information system (GIS) technology in surface mine reclamation monitoring

    SciTech Connect

    Dixon, C.

    1999-07-01

    The use of a Geographic Information System (GIS) and related technologies (e.g., Digital cartographic tools, satellite image processing systems) can benefit the planning and monitoring of open-pit mine reclamation activities. PCI Geomatics, in conjunction with Luscar Limited's Line Creek Mine, has developed a GIS-based system designed to store information relevant to planning and assessing reclamation progress. Data that existed in various formats throughout the company, and which had been collected since the mine-planning phase, was integrated into the GIS. The system is used to summarize current reclamation activities and is linked to corporate costing procedures. Monitoring of reclamation activities and quantifying change in the mine area is easily done using the spatial analysis capabilities of the GIS. Assessments of the change in reclamation areas are enhanced by using satellite image data to produce inexpensive and timely information on the land base, and allow the comparison of the health of the vegetation to reclamation areas from year to year. The implemented system substantially reduces the time needed to generate statistics and produce maps for government or internal reports. Also, there are benefits in terms of both cost and effectiveness of reclamation planning.

  16. 43 CFR 10005.16 - Plan content.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Plan content. 10005.16 Section 10005.16 Public Lands: Interior Regulations Relating to Public Lands (Continued) UTAH RECLAMATION MITIGATION AND... CONSERVATION PLAN § 10005.16 Plan content. (a) Minimum requirements. At a minimum, the plan will include: (1)...

  17. 43 CFR 423.30 - Weapons, firearms, explosives, and fireworks.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Weapons, firearms, explosives, and... WATERBODIES Rules of Conduct § 423.30 Weapons, firearms, explosives, and fireworks. (a) You may possess... exceptions: (1) You must not have a weapon in your possession when at or in a Reclamation facility. (2)...

  18. 43 CFR 23.8 - Approval of mining plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Approval of mining plan. 23.8 Section 23.8 Public Lands: Interior Office of the Secretary of the Interior SURFACE EXPLORATION, MINING AND RECLAMATION OF LANDS § 23.8 Approval of mining plan. (a) Before surface mining operations may commence...

  19. 43 CFR 3101.1-2 - Surface use rights.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Surface use rights. 3101.1-2 Section 3101... § 3101.1-2 Surface use rights. A lessee shall have the right to use so much of the leased lands as is... operations, and specification of interim and final reclamation measures. At a minimum, measures shall...

  20. 43 CFR 402.9 - Contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Contracts. 402.9 Section 402.9 Public... SALE OF LANDS IN FEDERAL RECLAMATION PROJECTS Public Lands § 402.9 Contracts. A contract in form... the United States by the Commissioner. A copy of the contract shall be furnished to the...

  1. 43 CFR 420.1 - Objectives.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Objectives. 420.1 Section 420.1 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR OFF-ROAD VEHICLE USE § 420.1 Objectives. The provisions of this part establish regulations for...

  2. 43 CFR 10000.4 - Objective.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Objective. 10000.4 Section 10000.4 Public Lands: Interior Regulations Relating to Public Lands (Continued) UTAH RECLAMATION MITIGATION AND CONSERVATION COMMISSION ORGANIZATION AND FUNCTIONS § 10000.4 Objective. Section 301 of the Act established...

  3. 43 CFR 10005.8 - Mitigation obligations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Mitigation obligations. 10005.8 Section 10005.8 Public Lands: Interior Regulations Relating to Public Lands (Continued) UTAH RECLAMATION MITIGATION AND CONSERVATION COMMISSION POLICIES AND PROCEDURES FOR DEVELOPING AND IMPLEMENTING THE COMMISSION'S MITIGATION AND CONSERVATION PLAN §...

  4. 43 CFR 418.22 - Future adjustments to Lahontan Reservoir storage targets.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Future adjustments to Lahontan Reservoir... RECLAMATION PROJECT, NEVADA Operations and Management § 418.22 Future adjustments to Lahontan Reservoir storage targets. (a) The Lahontan Reservoir storage targets must be adjusted to accommodate changes...

  5. 43 CFR 10010.20 - Adoption.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Adoption. 10010.20 Section 10010.20 Public Lands: Interior Regulations Relating to Public Lands (Continued) UTAH RECLAMATION MITIGATION AND... Environmental Assessments § 10010.20 Adoption. (a) An EA prepared for a proposal before the Commission...

  6. 43 CFR 428.9 - Farm operators who are former owners of excess land.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Farm operators who are former owners of... RECLAMATION, DEPARTMENT OF THE INTERIOR INFORMATION REQUIREMENTS FOR CERTAIN FARM OPERATIONS IN EXCESS OF 960 ACRES AND THE ELIGIBILITY OF CERTAIN FORMERLY EXCESS LAND § 428.9 Farm operators who are former...

  7. 43 CFR 426.8 - Nonresident aliens and foreign entities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Nonresident aliens and foreign entities..., DEPARTMENT OF THE INTERIOR ACREAGE LIMITATION RULES AND REGULATIONS § 426.8 Nonresident aliens and foreign... reclamation law or these regulations, a nonresident alien or foreign entity that directly holds land in...

  8. 43 CFR 3816.1 - Mineral locations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Mineral locations. 3816.1 Section 3816.1..., DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) LANDS AND MINERALS SUBJECT TO LOCATION Mineral Locations in Reclamation Withdrawals § 3816.1 Mineral locations. The Act of April 23, 1932 (47 Stat. 136;...

  9. 43 CFR 10000.7 - Place of business; service of process.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Place of business; service of process... RECLAMATION MITIGATION AND CONSERVATION COMMISSION ORGANIZATION AND FUNCTIONS § 10000.7 Place of business; service of process. (a) The principle place of business and offices of the agency are located at 111...

  10. 43 CFR 413.4 - Assessment of other project act lands and rights of way.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Assessment of other project act lands and rights of way. 413.4 Section 413.4 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR ASSESSMENT BY IRRIGATION DISTRICTS OF LANDS OWNED BY THE UNITED...

  11. 43 CFR 413.5 - Reports on status of settlement lands.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Reports on status of settlement lands. 413.5 Section 413.5 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR ASSESSMENT BY IRRIGATION DISTRICTS OF LANDS OWNED BY THE UNITED STATES,...

  12. 43 CFR 418.7 - Who may receive irrigation deliveries.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Who may receive irrigation deliveries. 418.7 Section 418.7 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION... Conditions of Water Delivery § 418.7 Who may receive irrigation deliveries. Project irrigation...

  13. 43 CFR 423.27 - Advertising and public solicitation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Advertising and public solicitation. 423.27 Section 423.27 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION... of Conduct § 423.27 Advertising and public solicitation. You must not engage in advertising...

  14. 43 CFR 10010.14 - Time limits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Time limits. 10010.14 Section 10010.14 Public Lands: Interior Regulations Relating to Public Lands (Continued) UTAH RECLAMATION MITIGATION AND... Initiating the NEPA Process § 10010.14 Time limits. When time limits are established to prepare...

  15. 43 CFR 418.12 - Project efficiency.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Project efficiency. 418.12 Section 418.12... INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Conditions of Water Delivery § 418.12 Project efficiency. (a) The principal feature of this part is to obtain a...

  16. 43 CFR 426.14 - Involuntary acquisition of land.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Involuntary acquisition of land. 426.14 Section 426.14 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR ACREAGE LIMITATION RULES AND REGULATIONS § 426.14 Involuntary acquisition of land. (a) Definitions for purposes of this...

  17. 43 CFR 420.23 - Public notice and information.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Public notice and information. 420.23 Section 420.23 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR OFF-ROAD VEHICLE USE Designated Areas and Permitted Events § 420.23 Public notice and information. Areas and trails may be...

  18. 43 CFR 426.12 - Excess land.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Excess land. 426.12 Section 426.12 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR ACREAGE LIMITATION RULES AND REGULATIONS § 426.12 Excess land. (a) The process of designating excess and nonexcess land. If a landowner owns...

  19. 43 CFR 426.4 - Attribution of land.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Attribution of land. 426.4 Section 426.4 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR ACREAGE LIMITATION RULES AND REGULATIONS § 426.4 Attribution of land. (a) Prohibition on increasing acreage limitation entitlements....

  20. 43 CFR 424.1 - Regulations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Regulations. 424.1 Section 424.1 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR REGULATIONS PERTAINING TO STANDARDS FOR THE PREVENTION, CONTROL, AND ABATEMENT OF ENVIRONMENTAL POLLUTION...

  1. 43 CFR 10010.28 - Summary.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Summary. 10010.28 Section 10010.28 Public Lands: Interior Regulations Relating to Public Lands (Continued) UTAH RECLAMATION MITIGATION AND... Environmental Impact Statements § 10010.28 Summary. The emphasis in the summary should be on...

  2. 43 CFR 429.13 - How long will the application review process take?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false How long will the application review process take? 429.13 Section 429.13 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF... application review process take? (a) Reclamation will acknowledge in writing your completed and...

  3. 43 CFR 417.6 - General regulations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false General regulations. 417.6 Section 417.6 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR PROCEDURAL METHODS FOR IMPLEMENTING COLORADO RIVER WATER CONSERVATION MEASURES WITH LOWER...

  4. 43 CFR 417.4 - Changed conditions, emergency, or hardship modifications.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Changed conditions, emergency, or hardship modifications. 417.4 Section 417.4 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR PROCEDURAL METHODS FOR IMPLEMENTING COLORADO RIVER WATER...

  5. 43 CFR 418.31 - Conservation measures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Conservation measures. 418.31 Section 418... THE INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Water Management and Conservation § 418.31 Conservation measures. (a) Specific conservation actions will be...

  6. 43 CFR 431.6 - Power generation estimates.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Power generation estimates. 431.6 Section... THE INTERIOR GENERAL REGULATIONS FOR POWER GENERATION, OPERATION, MAINTENANCE, AND REPLACEMENT AT THE BOULDER CANYON PROJECT, ARIZONA/NEVADA § 431.6 Power generation estimates. Reclamation shall...

  7. 43 CFR 10005.9 - Relationship of the plan to congressional appropriations and Commission expenditures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Relationship of the plan to congressional appropriations and Commission expenditures. 10005.9 Section 10005.9 Public Lands: Interior Regulations Relating to Public Lands (Continued) UTAH RECLAMATION MITIGATION AND CONSERVATION COMMISSION POLICIES AND PROCEDURES FOR DEVELOPING...

  8. 43 CFR 402.10 - Patent.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Patent. 402.10 Section 402.10 Public Lands... LANDS IN FEDERAL RECLAMATION PROJECTS Public Lands § 402.10 Patent. When a purchaser has complied fully... and patent and shall state the statutory authority for such liens. The receipt shall be submitted...

  9. 43 CFR 10005.12 - Policy regarding the scope of measures to be included in the plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Policy regarding the scope of measures to be included in the plan. 10005.12 Section 10005.12 Public Lands: Interior Regulations Relating to Public Lands (Continued) UTAH RECLAMATION MITIGATION AND CONSERVATION COMMISSION POLICIES AND PROCEDURES FOR DEVELOPING AND IMPLEMENTING...

  10. 43 CFR 10010.6 - Public involvement.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Public involvement. 10010.6 Section 10010.6 Public Lands: Interior Regulations Relating to Public Lands (Continued) UTAH RECLAMATION... POLICY ACT Protection and Enhancement of Environmental Quality § 10010.6 Public involvement....

  11. 43 CFR 426.10 - Public entities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Public entities. 426.10 Section 426.10 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR ACREAGE LIMITATION RULES AND REGULATIONS § 426.10 Public entities. (a) Application of the...

  12. 43 CFR 10010.42 - Public involvement.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Public involvement. 10010.42 Section 10010.42 Public Lands: Interior Regulations Relating to Public Lands (Continued) UTAH RECLAMATION... POLICY ACT Environmental Impact Statements § 10010.42 Public involvement. The Commission will adhere...

  13. 43 CFR 426.22 - Public participation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Public participation. 426.22 Section 426.22 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR ACREAGE LIMITATION RULES AND REGULATIONS § 426.22 Public participation. (a)...

  14. 43 CFR 423.43 - Alcoholic beverages.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Alcoholic beverages. 423.43 Section 423.43 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE....43 Alcoholic beverages. You must not possess or consume alcoholic beverages in violation of...

  15. 43 CFR 420.11 - Requirements-vehicles.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Requirements-vehicles. 420.11 Section 420... THE INTERIOR OFF-ROAD VEHICLE USE Operating Criteria § 420.11 Requirements—vehicles. Each off-road vehicle that is operated on Reclamation lands shall meet the following requirements: (a) It shall...

  16. 43 CFR 2524.6 - Desert-land entryman may proceed independently of Government irrigation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Desert-land entryman may proceed... (2000) DESERT-LAND ENTRIES Desert-Land Entries Within a Reclamation Project § 2524.6 Desert-land... that a desert-land entryman who owns a water right and reclaims the land embraced in his entry...

  17. 43 CFR 2524.5 - Assignment of desert-land entries in whole or in part.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Assignment of desert-land entries in whole... (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR LAND RESOURCE MANAGEMENT (2000) DESERT-LAND ENTRIES Desert-Land Entries Within a Reclamation Project § 2524.5 Assignment of desert-land entries...

  18. 43 CFR 3816.2 - Application to open lands to location.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Application to open lands to location... LOCATION Mineral Locations in Reclamation Withdrawals § 3816.2 Application to open lands to location. Application to open lands to location under the Act may be filed by a person, association or...

  19. 43 CFR 10010.53 - Emergencies.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Emergencies. 10010.53 Section 10010.53 Public Lands: Interior Regulations Relating to Public Lands (Continued) UTAH RECLAMATION MITIGATION AND... Relationship to Decision-Making § 10010.53 Emergencies. In the event of an unanticipated emergency...

  20. 43 CFR 423.39 - Standards for vessels.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Standards for vessels. 423.39 Section 423... Conduct § 423.39 Standards for vessels. (a) All vessels on Reclamation waters must: (1) Be constructed and... operators of vessels not in compliance with this § 423.39 may be required to remove the vessel...

  1. 43 CFR 404.10 - Are there certain types of infrastructure and facilities that may not be included in a rural...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Are there certain types of infrastructure... RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.10 Are there certain types of infrastructure and... not include: (a) Any infrastructure or facilities that would deliver water for commercial...

  2. 43 CFR 423.21 - Responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Responsibilities. 423.21 Section 423.21 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE....21 Responsibilities. (a) You are responsible for finding, being aware of, and obeying all...

  3. Approaches to Post-Mining Land Reclamation in Polish Open-Cast Lignite Mining

    NASA Astrophysics Data System (ADS)

    Kasztelewicz, Zbigniew

    2014-06-01

    The paper presents the situation regarding the reclamation of post-mining land in the case of particular lignite mines in Poland until 2012 against the background of the whole opencast mining. It discusses the process of land purchase for mining operations and its sales after reclamation. It presents the achievements of mines in the reclamation and regeneration of post-mining land as a result of which-after development processes carried out according to European standards-it now serves the inhabitants as a recreational area that increases the attractiveness of the regions.

  4. Chaos in social learning with multiple true states

    NASA Astrophysics Data System (ADS)

    Fang, Aili; Wang, Lin; Zhao, Jiuhua; Wang, Xiaofan

    2013-11-01

    Most existing social learning models assume that there is only one underlying true state. In this work, we consider a social learning model with multiple true states, in which agents in different groups receive different signal sequences generated by their corresponding underlying true states. Each agent updates his belief by combining his rational self-adjustment based on the external signals he received and the influence of his neighbors according to their communication. We observe chaotic oscillation in the belief evolution, which implies that neither true state could be learnt correctly by calculating the largest Lyapunov exponents and Hurst exponents.

  5. Material Properties Test to Determine Ultimate Strain and True Stress-True Strain Curves for High Yield Steels

    SciTech Connect

    K.R. Arpin; T.F. Trimble

    2003-04-01

    This testing was undertaken to develop material true stress-true strain curves for elastic-plastic material behavior for use in performing transient analysis. Based on the conclusions of this test, the true stress-true strain curves derived herein are valid for use in elastic-plastic finite element analysis for structures fabricated from these materials. In addition, for the materials tested herein, the ultimate strain values are greater than those values cited as the limits for the elastic-plastic strain acceptance criteria for transient analysis.

  6. 30 CFR 946.20 - Abandoned mine land reclamation plan approval.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... Drawer 900, Big Stone Gap, Virginia 24219. (b) Office of Surface Mining Reclamation and Enforcement, Big Stone Gap Field Office, P.O. Drawer 1216, Powell Valley Square Shopping Center, room 220, Route 23,...

  7. 30 CFR 946.20 - Abandoned mine land reclamation plan approval.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    .... Drawer 900, Big Stone Gap, Virginia 24219. (b) Office of Surface Mining Reclamation and Enforcement, Big Stone Gap Field Office, P.O. Drawer 1216, Powell Valley Square Shopping Center, room 220, Route 23,...

  8. 30 CFR 946.20 - Abandoned mine land reclamation plan approval.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    .... Drawer 900, Big Stone Gap, Virginia 24219. (b) Office of Surface Mining Reclamation and Enforcement, Big Stone Gap Field Office, P.O. Drawer 1216, Powell Valley Square Shopping Center, room 220, Route 23,...

  9. 30 CFR 946.20 - Abandoned mine land reclamation plan approval.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    .... Drawer 900, Big Stone Gap, Virginia 24219. (b) Office of Surface Mining Reclamation and Enforcement, Big Stone Gap Field Office, P.O. Drawer 1216, Powell Valley Square Shopping Center, room 220, Route 23,...

  10. Study on the cumulative impact of reclamation activities on ecosystem health in coastal waters.

    PubMed

    Shen, Chengcheng; Shi, Honghua; Zheng, Wei; Li, Fen; Peng, Shitao; Ding, Dewen

    2016-02-15

    The purpose of this study is to develop feasible tools to investigate the cumulative impact of reclamations on coastal ecosystem health, so that the strategies of ecosystem-based management can be applied in the coastal zone. An indicator system and model were proposed to assess the cumulative impact synthetically. Two coastal water bodies, namely Laizhou Bay (LZB) and Tianjin coastal waters (TCW), in the Bohai Sea of China were studied and compared, each in a different phase of reclamations. Case studies showed that the indicator scores of coastal ecosystem health in LZB and TCW were 0.75 and 0.68 out of 1.0, respectively. It can be concluded that coastal reclamations have a historically cumulative effect on benthic environment, whose degree is larger than that on aquatic environment. The ecosystem-based management of coastal reclamations should emphasize the spatially and industrially intensive layout. PMID:26763325

  11. DELUGE AND WATER RECLAMATION BASIN BELOW TEST STAND 1A. Looking ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    DELUGE AND WATER RECLAMATION BASIN BELOW TEST STAND 1-A. Looking north northwest - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Flame Deflector Water System, Test Area 1-120, north end of Jupiter Boulevard, Boron, Kern County, CA

  12. 30 CFR 875.16 - Exclusion of certain noncoal reclamation sites.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the reclamation of sites and areas designated for remedial action under the Uranium Mill Tailings... Uranium Mill Tailings Radiation Control Act of 1978 (42 U.S.C. 7901 et seq.) or that have been listed...

  13. 30 CFR 875.16 - Exclusion of certain noncoal reclamation sites.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... the reclamation of sites and areas designated for remedial action under the Uranium Mill Tailings... Uranium Mill Tailings Radiation Control Act of 1978 (42 U.S.C. 7901 et seq.) or that have been listed...

  14. 30 CFR 875.16 - Exclusion of certain noncoal reclamation sites.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... the reclamation of sites and areas designated for remedial action under the Uranium Mill Tailings... Uranium Mill Tailings Radiation Control Act of 1978 (42 U.S.C. 7901 et seq.) or that have been listed...

  15. 30 CFR 875.16 - Exclusion of certain noncoal reclamation sites.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... the reclamation of sites and areas designated for remedial action under the Uranium Mill Tailings... Uranium Mill Tailings Radiation Control Act of 1978 (42 U.S.C. 7901 et seq.) or that have been listed...

  16. Evaluation for coastal reclamation feasibility using a comprehensive hydrodynamic framework: A case study in Haizhou Bay.

    PubMed

    Feng, Lan; He, Jia; Ai, Junyong; Sun, Xiang; Bian, Fangyuan; Zhu, Xiaodong

    2015-11-15

    Coastal reclamation (CR) is a prevailing approach to solve the contradiction between the land shortage and the growing demand of living space for human beings. In general, environmental impact assessment (EIA) focuses on evaluating the feasibility of individual coastal reclamation project (CRP). However, few studies have investigated the cumulative effect of multiple CRPs on surrounding environment. In this study, an integrated framework based on coastal hydrodynamics was established, and then applied to the feasibility evaluation of multiple CRPs for future coastal management in Haizhou Bay, China. The results indicated that three out of five reclamation projects were feasible and the remaining two were forbidden in the study area, whereas EIA approves of all the CRPs. It provides a scientific reference for effective management of coastal reclamation and future environmental impact researches when new CRPs are proposed. PMID:26364204

  17. "U.S. Reclamation Service Grand River Dam details of piers 'D' ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    "U.S. Reclamation Service Grand River Dam details of piers 'D' & 'F,' Oct. 25, 1914." - Grand Valley Diversion Dam, Half a mile north of intersection of I-70 & Colorado State Route 65, Cameo, Mesa County, CO

  18. EMERGING TECHNOLOGY REPORT: RECLAMATION OF LEAD FROM SUPERFUND WASTE MATERIAL USING SECONDARY LEAD SMELTERS

    EPA Science Inventory

    There are over 3000 sites across the United States contaminated with lead. echniques to remediate these sites include standard stabilization/disposal technologies, reclamation of lead using secondary lead smelters, soil washing, and biological removal technologies. hrough a Coope...

  19. 30 CFR 902.20 - Approval of Alaska abandoned mine land reclamation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., Suite 800, Anchorage, AK 99503-5925, Telephone: (907)762-2149. (b) Office of Surface Mining Reclamation and Enforcement, Western Regional Coordinating Center, Technical Library, 1999 Broadway, Suite...

  20. True and False Memories, Parietal Cortex, and Confidence Judgments

    ERIC Educational Resources Information Center

    Urgolites, Zhisen J.; Smith, Christine N.; Squire, Larry R.

    2015-01-01

    Recent studies have asked whether activity in the medial temporal lobe (MTL) and the neocortex can distinguish true memory from false memory. A frequent complication has been that the confidence associated with correct memory judgments (true memory) is typically higher than the confidence associated with incorrect memory judgments (false memory).…

  1. Discovering a "True" Map of the World--Learning Activities.

    ERIC Educational Resources Information Center

    Hantula, James

    "True" maps of the world, as seen from the perspective of the time in which they were produced, remain an ethnocentric visual language in modern times. Students can gain insight into such "true" maps by studying maps produced in the great traditions of the West and East. Teachers can determine a map's appropriateness by identifying its title,…

  2. Adults' Memories of Childhood: True and False Reports

    ERIC Educational Resources Information Center

    Qin, Jianjian; Ogle, Christin M.; Goodman, Gail S.

    2008-01-01

    In 3 experiments, the authors examined factors that, according to the source-monitoring framework, might influence false memory formation and true/false memory discernment. In Experiment 1, combined effects of warning and visualization on false childhood memory formation were examined, as were individual differences in true and false childhood…

  3. 30 CFR 946.25 - Approval of Virginia abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... CFR 884.13(a), (b), (c)(1), (c)(2), (c)(3), (c)(4), (c)(5), (c)(6), (c)(7), (d)(1), (d)(2), (d)(3), (d... Revisions to the Virginia State Reclamation Plan corresponding to 30 CFR 884.13(c)(2)—Ranking and Selection... Revisions to the Virginia State Reclamation Plan corresponding to 30 CFR 884.13(c)(2)—Ranking and...

  4. 30 CFR 946.25 - Approval of Virginia abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... CFR 884.13(a), (b), (c)(1), (c)(2), (c)(3), (c)(4), (c)(5), (c)(6), (c)(7), (d)(1), (d)(2), (d)(3), (d... Revisions to the Virginia State Reclamation Plan corresponding to 30 CFR 884.13(c)(2)—Ranking and Selection... Revisions to the Virginia State Reclamation Plan corresponding to 30 CFR 884.13(c)(2)—Ranking and...

  5. 30 CFR 946.25 - Approval of Virginia abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... CFR 884.13(a), (b), (c)(1), (c)(2), (c)(3), (c)(4), (c)(5), (c)(6), (c)(7), (d)(1), (d)(2), (d)(3), (d... Revisions to the Virginia State Reclamation Plan corresponding to 30 CFR 884.13(c)(2)—Ranking and Selection... Revisions to the Virginia State Reclamation Plan corresponding to 30 CFR 884.13(c)(2)—Ranking and...

  6. 30 CFR 946.25 - Approval of Virginia abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... CFR 884.13(a), (b), (c)(1), (c)(2), (c)(3), (c)(4), (c)(5), (c)(6), (c)(7), (d)(1), (d)(2), (d)(3), (d... Revisions to the Virginia State Reclamation Plan corresponding to 30 CFR 884.13(c)(2)—Ranking and Selection... Revisions to the Virginia State Reclamation Plan corresponding to 30 CFR 884.13(c)(2)—Ranking and...

  7. Ames' mutagenic activity in recycled water from an Israeli water reclamation project

    SciTech Connect

    Neeman, I.; Kroll, R.; Mahler, A.; Rubin, R.J.

    1980-01-01

    Effluent samples taken from a water reclamation project in Israel were analyzed for mutagenicity and toxicity using the Ames assay test. Test results indicate the presence of low levels of mutagens in recycled water taken from the reclamation plant; samples taken from different sites in the plant yielded different levels of mutagenicity. Improved wastewater treatment technology is needed to make water reuse safe. (2 graphs, 15 references, 1 table)

  8. Disputes over science and dispute resolution approaches - A survey of Bureau of Reclamation employees

    USGS Publications Warehouse

    Burkardt, Nina; Ruell, Emily W.

    2012-01-01

    Water resources in parts of the Western United States are over-allocated, which intensifies the pressure to support water management decisions with strong scientific evidence. Because scientific studies sometimes provide uncertain or competing results or recommendations, science can become a source of disputes during decision-making processes. The Bureau of Reclamation (Reclamation) is an important water manager in the Western United States, and Reclamation decision processes are often contested by a variety of affected constituencies. We conducted a Web-based survey of Reclamation employees to determine (1) which types of disputes over science are occurring and how common they are, (2) which approaches have been used by Reclamation to try to resolve these different types of disputes, (3) how useful Reclamation employees find these approaches at resolving these types of disputes, (4) the final outcomes of these disputes and the decision-making processes that were hindered by the disputes over science, and (5) the potential usefulness of several different types of dispute resolution resources that Reclamation could provide for employees that become involved in disputes over science. The calculated minimum response rate for the survey was 59 percent. Twenty-five percent of respondents indicated that they had been involved in a dispute over science while working at Reclamation. Native species and species listed under the Endangered Species Act of 1973 were the most common issue types reported in these disputes over science. Survey respondents indicated that they used a variety of approaches to resolve disputes over science and rated most approaches as either neutral or somewhat helpful in these endeavors. Future research is needed to determine whether there are additional variables underlying these disputes that were not measured in this survey that may identify when dispute resolution methods are most effective, or whether resolving aspects of these disputes, such as

  9. 30 CFR 946.25 - Approval of Virginia abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Revisions to the Virginia State Reclamation Plan corresponding to 30 CFR 884.13(c)(2)—Ranking and Selection... Revisions to the Virginia State Reclamation Plan corresponding to 30 CFR 884.13(c)(2)—Ranking and Selection... CFR 884.13(a), (b), (c)(1), (c)(2), (c)(3), (c)(4), (c)(5), (c)(6), (c)(7), (d)(1), (d)(2), (d)(3),...

  10. Short-term influence of coal mine reclamation using coal combustion residues on groundwater quality.

    PubMed

    Cheng, Chin-Min; Amaya, Maria; Butalia, Tarunjit; Baker, Robert; Walker, Harold W; Massey-Norton, John; Wolfe, William

    2016-11-15

    Two full-scale coal mine reclamation projects using coal combustion residues (CCRs) were recently carried out at highwall pit complexes near the Conesville and Cardinal coal-fired power plants owned by American Electric Power. The environment impacts of the reclamation projects were examined by regularly monitoring the leaching characteristics of the backfilling CCRs and the water quality of the uppermost aquifers underlying the sites. With over five years of field monitoring, it shows that the water quality at both demonstration sites had changed since the reclamation began. By analyzing the change of the hydrogeochemical properties, it was concluded that the water quality impact observed at the Conesville Five Points site was unlikely due to the seepage of FGD material leachates. Reclamation activities, such as logging, grading, and dewatering changed the hydrogeological conditions and resulted in the observed water quality changes. The same hydrogeological effect on water quality was also found at the Cardinal Star Ridge site during the early stage of the reclamation (approximately the first 22months). Subsequent measurements showed the water quality to be strongly influenced by the water in the reclaimed highwall pit. Despite the changes to the water quality, the impacts are insignificant and temporary. None of the constitutes showed concentration levels higher than the regulatory leaching limits set by the Ohio Department of Natural Resources' Division of Mineral Resources Management for utilizing CCRs in mined land reclamation. Compared to the local aquifers, the concentrations of eleven selected constituents remained at comparable levels throughout the study period. There are four constituents (i.e., As, Be, Sb, and Tl) that exceeded their respective MCLs after the reclamation began. These detections were found shortly (i.e., within 2years) after the reclamation began and decreased to the levels either lower than the respective detection limits or similar to

  11. Assessment of post forest fire reclamation in Algarve, Portugal

    NASA Astrophysics Data System (ADS)

    Andrade, Rita; Panagopoulos, Thomas; Guerrero, Carlos; Martins, Fernando; Zdruli, Pandi; Ladisa, Gaetano

    2014-05-01

    Fire is a common phenomenon in Mediterranean landscapes and it plays a crucial role in its transformations, making the determination of its impact on the ecosystem essential for land management. During summer of 2012, a wildfire took place in Algarve, Portugal, on an area mainly covered by sclerophyllous vegetation (39.44%, 10080ha), broad-leaved forest (20.80%, 5300ha), agriculture land with significant areas of natural vegetation (17.40%, 4400ha) and transitional woodlands-shrubs (16.17%, 4100ha). The objective of the study was to determine fire severity in order to plan post-fire treatments and to aid vegetation recovery and land reclamation. Satellite imagery was used to estimate burn severity by detecting physical and ecological changes in the landscape caused by fire. Differenced Normalized Burn Ratio (DNBR) was used to measure burn severity with pre and post fire data of four Landsat images acquired in October 2011, February and August 2012 and April 2013. The initial and extended differenced normalized burn ratio (DiNBR and DeNBR) were calculated. The calculated burned area of 24291 ha was 552ha lower than the map data determined with field reports. The 19.5% of that area was burned with high severity, 45% with moderate severity and 28.3% with low severity. Comparing fire severity and regrowth with land use, it is shown in DiNBR that the most severely burned areas were predominantly sclerophyllous vegetation (37.6%) and broad-leaved forests (31.1%). From the DeNRB it was found that the reestablishment of vegetation was slower in mixed forests and higher in sclerophyllous vegetation and in land with significant areas of natural vegetation. Faster recovery was calculated for the land uses of sclerophyllous vegetation (46.7%) and significant regrowth in areas of natural vegetation and lands occupied by agriculture (25.4%). Next steps of the study are field validation and crossing with erosion risk maps before to take land reclamation decisions.

  12. Decontamination and functional reclamation of dredged brackish sediments.

    PubMed

    Doni, S; Macci, C; Peruzzi, E; Iannelli, R; Ceccanti, B; Masciandaro, G

    2013-07-01

    The continuous stream of sediments, dredged from harbors and waterways for keeping shipping traffic efficiency, is a considerable ongoing problem recognized worldwide. This problem gets worse as most of the sediments dredged from commercial ports and waterways turn out to be polluted by a wide range of organic and inorganic contaminants. In this study, phytoremediation was explored as a sustainable reclamation technology for turning slightly-polluted brackish dredged sediments into a matrix feasible for productive use. To test this possibility, a phytoremediation experimentation was carried out in containers of about 0.7 m(3) each, filled with brackish dredged sediments contaminated by heavy metals and hydrocarbons. The sediments were pre-conditioned by adding an agronomic soil (30 % v/v) to improve their clayey granulometric composition, and by topping the mixture with high quality compost (4 kg m(-2)) to favour the initial adaptation of the selected vegetal species. The following plant treatments were tested: (1) Paspalum vaginatum, (2) Phragmites australis, (3) Spartium junceum + P. vaginatum, (4) Nerium oleander + P. vaginatum, (5) Tamarix gallica + P. vaginatum, and (6) unplanted control. Eighteen months after the beginning of the experimentation, all the plant species were found in healthy condition and well developed. Throughout the whole experiment, the monitored biological parameters (total microbial population and dehydrogenase activity) were generally observed as constantly increasing in all the planted sediments more than in the control, pointing out an improvement of the chemico-physical conditions of both microorganisms and plants. The concentration decrease of organic and inorganic contaminants (>35 and 20 %, respectively) in the treatments with plants, particularly in the T. gallica + P. vaginatum, confirmed the importance of the root-microorganism interaction in activating the decontamination processes. Finally, the healthy state of

  13. Neural processing associated with true and false memory retrieval.

    PubMed

    Okado, Yoko; Stark, Craig

    2003-12-01

    We investigated the neural bases for false memory with fMRI by examining neural activity during retrieval processes that yielded true or false memories. We used a reality monitoring paradigm in which participants saw or imagined pictures of concrete objects. (A subsequent misinformation task was also used to increase false memory rates.) At test, fMRI data were collected as the participants determined whether they had seen or had only imagined the object at study. True memories were of seen pictures accurately endorsed as seen, and for false memories were of imagined pictures falsely endorsed as seen. Three distinct patterns of activity were observed: Left frontal and parietal activity was not different for true and for false memories, whereas activity was greater for true than for false memories in occipital visual regions and posterior portions of the parahippocampal gyrus, and activity was greater for false than for true memories in right anterior cingulate gyrus. Possible interpretations are discussed. PMID:15040552

  14. Landscape ecological security response to land use change in the tidal flat reclamation zone, China.

    PubMed

    Zhang, Runsen; Pu, Lijie; Li, Jianguo; Zhang, Jing; Xu, Yan

    2016-01-01

    As coastal development becomes a national strategy in Eastern China, land use and landscape patterns have been affected by reclamation projects. In this study, taking Rudong County, China as a typical area, we analyzed land use change and its landscape ecological security responses in the tidal flat reclamation zone. The results show that land use change in the tidal flat reclamation zone is characterized by the replacement of natural tidal flat with agricultural and construction land, which has also led to a big change in landscape patterns. We built a landscape ecological security evaluation system, which consists of landscape interference degree and landscape fragile degree, and then calculated the landscape ecological security change in the tidal flat reclamation zone from 1990 to 2008 to depict the life cycle in tidal flat reclamation. Landscape ecological security exhibited a W-shaped periodicity, including the juvenile stage, growth stage, and maturation stage. Life-cycle analysis demonstrates that 37 years is required for the land use system to transform from a natural ecosystem to an artificial ecosystem in the tidal flat reclamation zone. PMID:26627206

  15. Problems getting from the laboratory to the field: Reclamation of an AML site

    SciTech Connect

    Dick, W.A.; Stehouwer, R.C.; Bigham, J.M.; Beeghly, J.H.

    1994-12-31

    Acid and toxic abandoned mineland sites provide an opportunity whereby flue gas desulfurization (FGD) by-product can be beneficially used as a reclamation amendment material. Studies are needed to compare the effectiveness of FGD by-product, as compared with resoil, for reclamation purposes. Initial studies provided information about the chemical and physical properties of the FGD by-product and how to transport and blend the FGD by-product with yard waste compost. Greenhouse studies indicated that rates of 125 dry tons/acre of FGD and 50 dry tons/acre of yard waste compost would provide optimum results for reclamation of acid and toxic spoil contained at the Fleming abandoned mineland (AML) site. Their results showed that heavy metal loading rates were much lower using the FGD/compost mixture than using resoil material. Dioxin in the mixture was also less than the 5 ppt level considered as normal background. The technical problems of using FGD by-product for reclamation of an AML site were solved. However, considerable efforts to educate the public about the merits of reclaiming the Fleming AML site using this FGD/compost mixture were required before initiating field reclamation activities. Education efforts must continue if FGD by-products are to achieve general acceptance as a reclamation alternative to resoil in cases where resoil is of scarce supply.

  16. Characterization of true stress-true strain curves obtained by hot deformation of different types of steels

    SciTech Connect

    Martin, G.E.S.; Ruzzante, J.E. . Grupo Deformacion en Caliente CNEA, Buenos Aires . Dept. Materials)

    1993-10-01

    The results of hot torsion tests in order to characterize the true stress-true strain curves at a high temperature for six different types of steel (carbon, free-cutting and alloyed), were presented in a previous work, and from those results, an expression was proposed to calculate the peak strain [bar [epsilon

  17. Effect of soil reclamation process on soil C fractions.

    PubMed

    Asensio, V; Vega, F A; Covelo, E F

    2014-01-01

    Mine soils are notable for their low organic matter content. Soils in the depleted copper mine in Touro (Galicia, Spain) were vegetated with trees (eucalyptuses and pines) and amended with wastes (sewage sludge and paper mill residues) to increase their carbon concentration. Two different zones at the mine (settling pond and mine tailing) and their respective treated areas (vegetated and/or amended) were sampled and analysed with the aim of evaluating in depth the effect of the reclamation treatments on both the concentration and quality of soil organic matter under field conditions. The results showed that the two treatments (tree vegetation and waste amendment) significantly increased the organic C in the mine soils from 1.4-6.6 to 10-112 g kg(-1). However, only the soil amended with wastes in the settling pond reached the usual values of undisturbed soils (92-126 g TOC kg(-1) soil). Amending with wastes was also the only treatment that increased the soil humified organic C concentration to proper values and therefore also the microbial biomass C. We recommend the use of organic wastes for amending soils poor in organic matter as well as the regular application of this treatment, as the nitrogen supply can be more limiting for plant growth than the organic C. PMID:24182398

  18. Phosphorus reclamation through hydrothermal carbonization of animal manures.

    PubMed

    Heilmann, Steven M; Molde, Joseph S; Timler, Jacobe G; Wood, Brandon M; Mikula, Anthony L; Vozhdayev, Georgiy V; Colosky, Edward C; Spokas, Kurt A; Valentas, Kenneth J

    2014-09-01

    Projected shortages of global phosphate have prompted investigation of methods that could be employed to capture and recycle phosphate, rather than continue to allow the resource to be essentially irreversibly lost through dilution in surface waters. Hydrothermal carbonization of animal manures from large farms was investigated as a scenario for the reclamation of phosphate for agricultural use and mitigation of the negative environmental impact of phosphate pollution. Hydrothermal reaction conditions were identified for poultry, swine, and cattle manures that resulted in hydrochar yields of 50-60% for all three manures, and >90% of the total phosphorus present in these systems was contained in the hydrochars as precipitated phosphate salts. Phosphate recovery was achieved in yields of 80-90% by subsequent acid treatment of the hydrochars, addition of base to acid extracts to achieve a pH of 9, and filtration of principally calcium phosphate. Phosphate recovery was achieved in yields of 81-87% based on starting manures by subsequent acid treatment of the hydrochars, addition of base to acid extracts to achieve a pH of 9, and filtration of principally calcium phosphate. Swine and cattle manures produced hydrochars with combustion energy contents comparable to those of high-end sub-bituminous coals. PMID:25111737

  19. Development of a thermal reclamation system for spent blasting abrasive

    SciTech Connect

    Bryan, B.B.; Mensinger, M.C.; Rehmat, A.G.

    1991-01-01

    Abrasive blasting is the most economical method for paint removal from large surface areas such as the hulls and tanks of oceangoing vessels. Tens of thousands of tons of spent abrasive are generated annually by blasting operations in private and US Navy shipyards. Some of this material is classified as hazardous waste, and nearly all of it is currently being either stockpiled or disposed in landfills. The rapid decline in available landfill space and corresponding rise in landfill tipping fees pose a severe problem for shipyard operators throughout the US. This paper discusses the results of a research and development program initiated by the Institute of Gas Technology and supported by the US Navy to develop and test a fluidized-bed thermal reclamation system for spent abrasive waste minimization. Bench- and pilot-scale reclaimer tests and reclaimed abrasive performance tests are described along with the current status of a program to build and test a 5-ton/hour prototype reclaimer at a US Navy shipyard.

  20. KLM's Boric Acid Reclamation System (BARS): An update

    SciTech Connect

    Schuelke, D.; Kniazewycz, B.G.; Markind, J.; Brossart, M.A.; Choi, R.C.

    1987-02-01

    KLM Technologies has implemented its Department of Energy Phase II Small Business Innovative Research (SBIR) demonstration program for a radioactive waste Boric Acid Reclamation System (BARS). Preliminary performance indicates enhanced treatment by the BARS technique over state of the art process methods for selective removal of silica and other impurities from borated water matrices. At optimal system recovery of 96 to 97%, BARS removes nominal levels of boric acid while achieving significant rejection for soluble silica and selective radioisotopes. This is indicative of superior performance compared to existing data governing standard boric acid process treatment in the presence of silica and other contaminants. Conventional technologies have also proven to be relatively expensive, utilizing costly chemically treated disposable resins for primary waste removal. The overall BARS program indicates substantial savings regarding off-site disposal costs based on reduced waste generation. Optimization of the BARS technology could have potential impact on conventional process technologies that are essentially non-selective in removal capacities. 2 figs.