Science.gov

Sample records for 2012-10-01 false nasa

  1. 48 CFR 1852.219-76 - NASA 8 percent goal.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA 8 percent goal. 1852... 1852.219-76 NASA 8 percent goal. As prescribed in 1819.7003 insert the following clause: NASA 8 Percent... and daily business operations are controlled by one or more women. (b) The NASA Administrator...

  2. 48 CFR 1816.506-70 - NASA contract clause.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA contract clause. 1816...-70 NASA contract clause. Insert the clause at 1852.216-80, Task Ordering Procedure, in solicitations... reporting (See NPR 9501.2, NASA Contractor Financial Management Reporting System), use the clause with...

  3. 48 CFR 1815.7001 - NASA Ombudsman Program.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA Ombudsman Program... ADMINISTRATION CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Ombudsman 1815.7001 NASA Ombudsman Program. NASA's implementation of an ombudsman program is in NPR 5101.33, Procurement...

  4. 48 CFR 1837.203 - Policy. (NASA supplements paragraph (c))

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Policy. (NASA supplements... Services 1837.203 Policy. (NASA supplements paragraph (c)) (c) Advisory and assistance services of... 3300.1, Appointment of Personnel To/From NASA, Chapter 4, Employment of Experts and Consultants)....

  5. 48 CFR 1835.016-71 - NASA Research Announcements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA Research... NASA Research Announcements. (a) Scope. An NRA is used to announce research interests in support of NASA's programs, and, after peer or scientific review using factors in the NRA, select proposals...

  6. 48 CFR 1850.104-70 - Lead NASA installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Lead NASA installation... Actions 1850.104-70 Lead NASA installation. (a) Contractors applying for indemnification shall determine which NASA installation has the highest dollar amount of contracts for which indemnification...

  7. 48 CFR 1852.233-70 - Protests to NASA.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Protests to NASA. 1852.233... 1852.233-70 Protests to NASA. As prescribed in 1833.106-70, insert the following provision: Protests to NASA (OCT 2002) Potential bidders or offerors may submit a protest under 48 CFR part 33 (FAR part...

  8. 48 CFR 1832.412-70 - NASA Contract clauses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA Contract clauses....412-70 NASA Contract clauses. When the clause at FAR 52.232-12 or its Alternates II or V are used, insert the clause at 1852.232-70, NASA Modification of FAR 52.232-12....

  9. 48 CFR 1816.402-270 - NASA technical performance incentives.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA technical performance incentives. 1816.402-270 Section 1816.402-270 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND....402-270 NASA technical performance incentives. (a) Pursuant to the guidelines in 1816.402, NASA...

  10. 48 CFR 1823.7001 - NASA solicitation provisions and contract clauses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA solicitation..., RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Safety and Health 1823.7001 NASA..., astronauts and pilots, the NASA workforce (including contractor employees working on NASA contracts), or...

  11. 48 CFR 1842.271 - NASA clause.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA clause. 1842.271 Section 1842.271 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION... NASA clause. Insert the clause at 1852.242-70, Technical Direction, when paragraph 3(m) of the...

  12. 48 CFR 1815.606 - Agency procedures. (NASA supplements paragraphs (a) and (b))

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Agency procedures. (NASA... Unsolicited Proposals 1815.606 Agency procedures. (NASA supplements paragraphs (a) and (b)) (a) NASA will not... Propulsion Laboratory (JPL) without the offeror's express consent....

  13. 48 CFR 1835.070 - NASA contract clauses and solicitation provision.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA contract clauses and....070 NASA contract clauses and solicitation provision. (a) The contracting officer shall insert the... ensure that the provision at 1852.235-72, Instructions for Responding to NASA Research Announcements,...

  14. 48 CFR 1815.602 - Policy. (NASA paragraphs (1) and (2))

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Policy. (NASA paragraphs... Proposals 1815.602 Policy. (NASA paragraphs (1) and (2)) (1) An unsolicited proposal may result in the award... is used, the NASA Grant and Cooperative Agreement Handbook (NPR 5800.1) applies. (2)...

  15. 48 CFR 1827.303-70 - NASA solicitation provisions and contract clauses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA solicitation... COPYRIGHTS Patent Rights Under Government Contracts 1827.303-70 NASA solicitation provisions and contract..., New Technology, in all NASA solicitations and contracts with other than a small business firm or...

  16. 48 CFR 1852.242-73 - NASA contractor financial management reporting.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA contractor financial... Provisions and Clauses 1852.242-73 NASA contractor financial management reporting. As prescribed in 1842.7202, insert the following clause: NASA Contractor Financial Management Reporting (NOV 2004) (a) The...

  17. 48 CFR 1845.107-70 - NASA solicitation provisions and contract clauses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA solicitation... NASA solicitation provisions and contract clauses. (a)(1) The contracting officer shall insert the... Government property is to be made available to a contractor working on a NASA installation, and...

  18. 48 CFR 1814.302 - Bid submission. (NASA supplements paragraph (b))

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Bid submission. (NASA supplements paragraph (b)) 1814.302 Section 1814.302 Federal Acquisition Regulations System NATIONAL... 1814.302 Bid submission. (NASA supplements paragraph (b)) (b) NASA contracting officers shall...

  19. 48 CFR 1852.232-70 - NASA modification of FAR 52.232-12.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA modification of FAR... Provisions and Clauses 1852.232-70 NASA modification of FAR 52.232-12. As prescribed at 1832.412-70, make the following modifications: NASA Modification of FAR 52.232-12, (MAR 1998) (a) Basic Clause. (1) In...

  20. 48 CFR 1837.110-70 - NASA solicitation provision and contract clauses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA solicitation... Contracts-General 1837.110-70 NASA solicitation provision and contract clauses. (a) The contracting officer... for on-site support services where emergency evacuations of the NASA installation may occur,...

  1. 48 CFR 1836.602-1 - Selection criteria. (NASA supplements paragraph (a))

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Selection criteria. (NASA... CONTRACTS Architect-Engineer Services 1836.602-1 Selection criteria. (NASA supplements paragraph (a)) (a)(2... the volume of work previously awarded to the firm by NASA, with the object of effecting an...

  2. 48 CFR 1841.501-70 - NASA contract clause.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA contract clause. 1841.501-70 Section 1841.501-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... 1841.501-70 NASA contract clause. The contracting officer shall insert the clause at...

  3. 48 CFR 1837.203-72 - NASA contract clauses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA contract clauses. 1837.203-72 Section 1837.203-72 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... NASA contract clauses. (a) The contracting officer shall insert the clause at 1852.237-72, Access...

  4. 48 CFR 1843.205-70 - NASA contract clauses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA contract clauses. 1843.205-70 Section 1843.205-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 1843.205-70 NASA contract clauses....

  5. 48 CFR 1815.209-70 - NASA solicitation provisions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA solicitation provisions. 1815.209-70 Section 1815.209-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND... Receipt of Proposals and Information 1815.209-70 NASA solicitation provisions. (a) The contracting...

  6. 48 CFR 1847.305-70 - NASA contract clauses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA contract clauses. 1847.305-70 Section 1847.305-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACT MANAGEMENT TRANSPORTATION Transportation in Supply Contracts 1847.305-70 NASA...

  7. 48 CFR 1832.111-70 - NASA contract clause.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA contract clause. 1832.111-70 Section 1832.111-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE....111-70 NASA contract clause. The contracting officer shall insert the clause at 1852.232-79,...

  8. 48 CFR 1813.302-570 - NASA solicitation provisions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA solicitation provisions. 1813.302-570 Section 1813.302-570 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND... Acquisition Methods 1813.302-570 NASA solicitation provisions. (a)(1) The contracting officer may use...

  9. 48 CFR 1832.502-470 - NASA contract clause.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA contract clause. 1832.502-470 Section 1832.502-470 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... NASA contract clause. The contracting officer may insert a clause substantially as stated at...

  10. 48 CFR 1813.003 - Policy. (NASA supplements paragraph (g))

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Policy. (NASA supplements paragraph (g)) 1813.003 Section 1813.003 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND... Policy. (NASA supplements paragraph (g)) (g) Acquisitions under these simplified acquisition...

  11. 48 CFR 1844.204-70 - NASA contract clause.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA contract clause. 1844.204-70 Section 1844.204-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... NASA contract clause. The contracting officer shall insert the clause at 1852.244-70,...

  12. 48 CFR 1801.103 - Authority. (NASA supplements paragraph (a))

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Authority. (NASA supplements paragraph (a)) 1801.103 Section 1801.103 Federal Acquisition Regulations System NATIONAL..., Issuance 1801.103 Authority. (NASA supplements paragraph (a)) (a) Under the following authorities,...

  13. 48 CFR 1811.404-70 - NASA contract clauses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA contract clauses. 1811.404-70 Section 1811.404-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... 1811.404-70 NASA contract clauses. The clause at 1852.211-70, Packaging, Handling, and...

  14. 48 CFR 1816.307-70 - NASA contract clauses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA contract clauses. 1816.307-70 Section 1816.307-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... NASA contract clauses. (a) The contracting officer shall insert the clause at 1852.216-73,...

  15. 48 CFR 1827.409-70 - NASA contract clause.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA contract clause. 1827.409-70 Section 1827.409-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE....409-70 NASA contract clause. The contracting officer shall use the clause at 1852.227-86,...

  16. 48 CFR 1846.370 - NASA contract clauses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA contract clauses. 1846.370 Section 1846.370 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 1846.370 NASA contract clauses. (a)...

  17. 48 CFR 1825.003-70 - NASA definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA definitions. 1825.003-70 Section 1825.003-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION 1825.003-70 NASA definitions. “Canadian end...

  18. 48 CFR 1814.201-670 - NASA solicitation provisions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA solicitation provisions. 1814.201-670 Section 1814.201-670 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND...-670 NASA solicitation provisions. (a) The contracting officer shall insert the provision at...

  19. 48 CFR 1827.302 - Policy. (NASA supplements paragraphs (a), (b), (c), (d), (e), (f), (g), and (i)).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Policy. (NASA supplements..., DATA, AND COPYRIGHTS Patent Rights Under Government Contracts 1827.302 Policy. (NASA supplements paragraphs (a), (b), (c), (d), (e), (f), (g), and (i)). (a) Introduction. (i) NASA policy with respect to...

  20. 48 CFR 1801.105-2 - Arrangement of regulations. (NASA supplements paragraph (b))

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Arrangement of regulations. (NASA supplements paragraph (b)) 1801.105-2 Section 1801.105-2 Federal Acquisition Regulations System..., Authority, Issuance 1801.105-2 Arrangement of regulations. (NASA supplements paragraph (b))...

  1. 48 CFR 1827.304-4 - Subcontracts. (NASA supplements paragraph (a))

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Subcontracts. (NASA supplements paragraph (a)) 1827.304-4 Section 1827.304-4 Federal Acquisition Regulations System NATIONAL... Rights Under Government Contracts 1827.304-4 Subcontracts. (NASA supplements paragraph (a)) (a)(i)...

  2. 48 CFR 1819.708 - Contract clauses. (NASA supplements paragraph (b))

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Contract clauses. (NASA supplements paragraph (b)) 1819.708 Section 1819.708 Federal Acquisition Regulations System NATIONAL... Subcontracting Program 1819.708 Contract clauses. (NASA supplements paragraph (b)) (b)(1) The contracting...

  3. 48 CFR 1832.202-1 - Policy. (NASA supplements paragraph (b))

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Policy. (NASA supplements paragraph (b)) 1832.202-1 Section 1832.202-1 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND... Financing 1832.202-1 Policy. (NASA supplements paragraph (b)) (b)(6) Advance payment limitations do...

  4. 48 CFR 1836.7004 - NASA solicitation provision and contract clause.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA solicitation provision and contract clause. 1836.7004 Section 1836.7004 Federal Acquisition Regulations System NATIONAL... CONTRACTS Partnering 1836.7004 NASA solicitation provision and contract clause. The contracting officer...

  5. 48 CFR 1823.271 - NASA Solicitation provision and contract clause.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA Solicitation provision and contract clause. 1823.271 Section 1823.271 Federal Acquisition Regulations System NATIONAL... Renewable Energy 1823.271 NASA Solicitation provision and contract clause. Insert the clause at...

  6. 48 CFR 1809.206-1 - General. (NASA supplements paragraph (b) and (c))

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false General. (NASA supplements paragraph (b) and (c)) 1809.206-1 Section 1809.206-1 Federal Acquisition Regulations System NATIONAL... Qualification requirements 1809.206-1 General. (NASA supplements paragraph (b) and (c)) (c) If an offeror...

  7. 48 CFR 1834.203-70 - NASA solicitation provision and contract clause.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA solicitation provision and contract clause. 1834.203-70 Section 1834.203-70 Federal Acquisition Regulations System... Earned Value Management System 1834.203-70 NASA solicitation provision and contract clause. Except...

  8. 48 CFR 1832.1005 - Contract clauses. (NASA supplements paragraph (a))

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Contract clauses. (NASA supplements paragraph (a)) 1832.1005 Section 1832.1005 Federal Acquisition Regulations System NATIONAL... Payments 1832.1005 Contract clauses. (NASA supplements paragraph (a)) (a) If the contract is for...

  9. 48 CFR 1819.708-70 - NASA solicitation provision and contract clause.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA solicitation provision and contract clause. 1819.708-70 Section 1819.708-70 Federal Acquisition Regulations System... Business Subcontracting Program 1819.708-70 NASA solicitation provision and contract clause. (a)...

  10. 48 CFR 1815.408-70 - NASA solicitation provisions and contract clauses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA solicitation provisions and contract clauses. 1815.408-70 Section 1815.408-70 Federal Acquisition Regulations System... NEGOTIATION Contract Pricing 1815.408-70 NASA solicitation provisions and contract clauses. (a)...

  11. 48 CFR 1832.705-270 - NASA clauses for limitation of cost or funds.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Funding 1832.705-270 NASA clauses for limitation of cost or funds. (a) The contracting officer shall... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA clauses for... insert a clause substantially as stated at 1852.232-81, Contract Funding, in Section B of...

  12. 48 CFR 1816.406-70 - NASA contract clauses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA contract clauses. 1816.406-70 Section 1816.406-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Incentive Contracts 1816.406-70...

  13. 48 CFR 1816.202-70 - NASA contract clause.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA contract clause. 1816.202-70 Section 1816.202-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Fixed-Price Contracts 1816.202-70...

  14. 48 CFR 1849.505-70 - NASA contract clause.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA contract clause. 1849.505-70 Section 1849.505-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS Contract Termination Clauses 1849.505-70...

  15. 48 CFR 1839.107-70 - NASA contract clause.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA contract clause. 1839.107-70 Section 1839.107-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 1839.107-70...

  16. 48 CFR 1828.101-70 - NASA solicitation provision.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA solicitation provision. 1828.101-70 Section 1828.101-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION GENERAL CONTRACTING REQUIREMENTS BONDS AND INSURANCE Bonds 1828.101-70...

  17. 48 CFR 1845.607-2 - Recovering precious metals. (NASA supplements paragraph (b)).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Recovering precious metals..., Redistribution, and Disposal of Contractor Inventory 1845.607-2 Recovering precious metals. (NASA supplements... bearing such metals; and items containing recoverable quantities of them shall be reported to the...

  18. 48 CFR 1852.219-77 - NASA Mentor-Protégé Program.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA Mentor-ProtégÃ... and Clauses 1852.219-77 NASA Mentor-Protégé Program. As prescribed in 1819.7215, insert the following clause: NASA Mentor-Protégé Program (Month/Year) (a) Prime contractors are encouraged to participate...

  19. 42 CFR 21.23 - False statements as disqualification.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false False statements as disqualification. 21.23 Section 21.23 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES PERSONNEL COMMISSIONED OFFICERS Appointment § 21.23 False statements as disqualification. Willfully false...

  20. 48 CFR 52.214-4 - False Statements in Bids.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 2 2012-10-01 2012-10-01 false False Statements in Bids. 52.214-4 Section 52.214-4 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION (CONTINUED) CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses...

  1. 45 CFR 3.4 - False reports and reports of injury or damage.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 1 2012-10-01 2012-10-01 false False reports and reports of injury or damage. 3.4 Section 3.4 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION CONDUCT OF PERSONS AND TRAFFIC ON THE NATIONAL INSTITUTES OF HEALTH FEDERAL ENCLAVE General § 3.4 False reports...

  2. 47 CFR 0.560 - Penalty for false representation of identity.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false Penalty for false representation of identity. 0.560 Section 0.560 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMISSION ORGANIZATION Privacy Act Regulations § 0.560 Penalty for false representation of identity. Any individual who...

  3. 47 CFR 11.45 - Prohibition of false or deceptive EAS transmissions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false Prohibition of false or deceptive EAS transmissions. 11.45 Section 11.45 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL EMERGENCY ALERT SYSTEM (EAS) Organization § 11.45 Prohibition of false or deceptive EAS transmissions. No person...

  4. 47 CFR 80.335 - Procedures for canceling false distress alerts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Procedures for canceling false distress alerts. 80.335 Section 80.335 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES STATIONS IN THE MARITIME SERVICES Safety Watch Requirements and Procedures...

  5. 48 CFR 1827.409 - Solicitation provisions and contract clauses. (NASA supplements paragraph (a), (b), (c), (d), (e...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Solicitation provisions... Section 1827.409 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Rights in Data and Copyrights...

  6. 48 CFR 1827.404 - Basic rights in data clause. (NASA supplements paragraphs (d), (e), (f), (g), (h), and (i))

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Basic rights in data... Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Rights in Data and Copyrights 1827.404 Basic rights in data clause....

  7. 48 CFR 1804.470-3 - IT security requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Policies are available at the NASA IT Security Policy Web site at: http://www.nasa.gov/offices/ocio... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false IT security requirements... security requirements. (a) These IT security requirements cover all NASA awards in which IT plays a role...

  8. False assumptions.

    PubMed

    Swaminathan, M

    1997-01-01

    Indian women do not have to be told the benefits of breast feeding or "rescued from the clutches of wicked multinational companies" by international agencies. There is no proof that breast feeding has declined in India; in fact, a 1987 survey revealed that 98% of Indian women breast feed. Efforts to promote breast feeding among the middle classes rely on such initiatives as the "baby friendly" hospital where breast feeding is promoted immediately after birth. This ignores the 76% of Indian women who give birth at home. Blaming this unproved decline in breast feeding on multinational companies distracts attention from more far-reaching and intractable effects of social change. While the Infant Milk Substitutes Act is helpful, it also deflects attention from more pressing issues. Another false assumption is that Indian women are abandoning breast feeding to comply with the demands of employment, but research indicates that most women give up employment for breast feeding, despite the economic cost to their families. Women also seek work in the informal sector to secure the flexibility to meet their child care responsibilities. Instead of being concerned about "teaching" women what they already know about the benefits of breast feeding, efforts should be made to remove the constraints women face as a result of their multiple roles and to empower them with the support of families, governmental policies and legislation, employers, health professionals, and the media.

  9. 48 CFR 1819.7214 - Measurement of program success.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Measurement of program success. 1819.7214 Section 1819.7214 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Mentor-Protégé Program 1819.7214...

  10. 48 CFR 1852.227-19 - Commercial computer software-Restricted rights.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Commercial computer... Provisions and Clauses 1852.227-19 Commercial computer software—Restricted rights. (a) As prescribed in 1827... regarding any computer software delivered under this contract/purchase order, the NASA Contracting...

  11. 48 CFR 1819.7206 - Agreement contents.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Agreement contents. 1819.7206 Section 1819.7206 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Mentor-Protégé Program 1819.7206 Agreement contents. Each mentor-protégé agreement...

  12. 48 CFR 1825.901 - Policy.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Policy. 1825.901 Section 1825.901 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Customs and Duties 1825.901 Policy. NASA has statutory authority...

  13. 48 CFR 1832.1009 - Title.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Title. 1832.1009 Section 1832.1009 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Performance-Based Payments 1832.1009 Title. In accordance with 42 U.S.C. 2465d, NASA shall not...

  14. 48 CFR 1852.204-76 - Security requirements for unclassified information technology resources.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... the IT Security Web site at https://itsecurity.nasa.gov/policies/index.html. (d) The contractor shall... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Security requirements for... CONTRACT CLAUSES Texts of Provisions and Clauses 1852.204-76 Security requirements for...

  15. 48 CFR 1842.7002 - Travel outside of the United States.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Travel outside of the... NASA Contract Clauses 1842.7002 Travel outside of the United States. The contracting officer shall insert the clause at 1852.242-71, Travel Outside of the United States, in...

  16. 48 CFR 1817.204 - Contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Contracts. 1817.204... CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Options 1817.204 Contracts. (e)(i) The 5-year limitation (basic plus option periods) applies to all NASA contracts regardless of type and...

  17. 48 CFR 1823.570 - Drug- and alcohol-free workforce.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Drug- and alcohol-free..., OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Drug-Free Workplace 1823.570 Drug- and alcohol-free workforce. This section sets sets forth NASA requirements for mandatory drug and alcohol testing of...

  18. 48 CFR 1819.7209 - Credit agreements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Credit agreements. 1819... ADMINISTRATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Mentor-Protégé Program 1819.7209 Credit agreements. (a) The credit permits the mentor to include the cost it expends on a mentor-protégé agreement...

  19. 48 CFR 1842.7003 - Emergency medical services and evacuation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Emergency medical services... NASA Contract Clauses 1842.7003 Emergency medical services and evacuation. The contracting officer must insert the clause at 1852.242-78, Emergency Medical Services and Evacuation, in all solicitations...

  20. 48 CFR 37.106 - Funding and term of service contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Funding and term of... REGULATION SPECIAL CATEGORIES OF CONTRACTING SERVICE CONTRACTING Service Contracts-General 37.106 Funding and...). (b) The head of an executive agency, except NASA, may enter into a contract, exercise an option,...

  1. False Color Bands

    NASA Technical Reports Server (NTRS)

    2005-01-01

    [figure removed for brevity, see original site]

    The theme for the weeks of 1/17 and 1/24 is the north polar region of Mars as seen in false color THEMIS images. Ice/frost will typically appear as bright blue in color; dust mantled ice will appear in tones of red/orange.

    In a gray scale image, the suble variations seen in this false color image are almost impossible to identify. Note the orange band in the center of the frame, and the bluer bands to either side of it.

    Image information: VIS instrument. Latitude 87, Longitude 65.5 East (294.5 West). 19 meter/pixel resolution.

    Note: this THEMIS visual image has not been radiometrically nor geometrically calibrated for this preliminary release. An empirical correction has been performed to remove instrumental effects. A linear shift has been applied in the cross-track and down-track direction to approximate spacecraft and planetary motion. Fully calibrated and geometrically projected images will be released through the Planetary Data System in accordance with Project policies at a later time.

    NASA's Jet Propulsion Laboratory manages the 2001 Mars Odyssey mission for NASA's Office of Space Science, Washington, D.C. The Thermal Emission Imaging System (THEMIS) was developed by Arizona State University, Tempe, in collaboration with Raytheon Santa Barbara Remote Sensing. The THEMIS investigation is led by Dr. Philip Christensen at Arizona State University. Lockheed Martin Astronautics, Denver, is the prime contractor for the Odyssey project, and developed and built the orbiter. Mission operations are conducted jointly from Lockheed Martin and from JPL, a division of the California Institute of Technology in Pasadena.

  2. False Color Aurora

    NASA Technical Reports Server (NTRS)

    1997-01-01

    Data from NASA's Galileo spacecraft were used to produce this false-color composite of Jupiter's northern aurora on the night side of the planet. The height of the aurora, the thickness of the auroral arc, and the small-scale structure are revealed for the first time. Images in Galileo's red, green, and clear filters are displayed in red, green, and blue respectively. The smallest resolved features are tens of kilometers in size, which is a ten-fold improvement over Hubble Space Telescope images and a hundred-fold improvement over ground-based images.

    The glow is caused by electrically charged particles impinging on the atmosphere from above. The particles travel along Jupiter's magnetic field lines, which are nearly vertical at this latitude. The auroral arc marks the boundary between the 'closed' field lines that are attached to the planet at both ends and the 'open' field lines that extend out into interplanetary space. At the boundary the particles have been accelerated over the greatest distances, and the glow is especially intense.

    The latitude-longitude lines refer to altitudes where the pressure is 1 bar. The image shows that the auroral emissions originate about 500 kilometers (about 310 miles) above this surface. The colored background is light scattered from Jupiter's bright crescent, which is out of view to the right. North is at the top. The images are centered at 57 degrees north and 184 degrees west and were taken on April 2, 1997 at a range of 1.7 million kilometers (1.05 million miles) by Galileo's Solid State Imaging (SSI) system.

    The Jet Propulsion Laboratory, Pasadena, CA manages the mission for NASA's Office of Space Science, Washington, DC.

    This image and other images and data received from Galileo are posted on the World Wide Web, on the Galileo mission home page at: http:// galileo.jpl.nasa.gov. Background information and educational context for the images can be found at: http:/ /www.jpl.nasa.gov/galileo/sepo.

  3. The Kepler False Positive Table

    NASA Astrophysics Data System (ADS)

    Bryson, Steve; Kepler False Positive Working Group

    2015-01-01

    The Kepler Space Telescope has detected thousands of candidate exoplanets by observing transit signals in a sample of more than 190,000 stars. Many of these transit signals are false positives, defined as a transit-like signal that is not due to a planet orbiting the target star (or a bound companion if the target is a multiple-star system). Astrophysical causes of false positives include background eclipsing binaries, planetary transits not associated with the target star, and non-planetary eclipses of the target star by stellar companions. The fraction of Kepler planet candidates that are false positives ranges from about 10% at high Galactic latitudes to 40% at low Galactic latitudes. Creating a high-reliability planet candidate catalog for statistical studies such as occurrence rate calculations requires removing clearly identified false positives.The Kepler Object of Interest (KOI) catalog at the NExScI NASA Exoplanet Archive flags false positives, and will soon provide a high-level classification of false positives, but lacks detailed description of why a KOI was determined to be a false positive. The Kepler False Positive Working Group (FPWG) examines each false positive in detail to certify that it is correctly identified as a false positive, and determines the primary reason(s) a KOI is classified as a false positive. The work of the FPWG will be published as the Kepler False Positive Table, hosted at the NExScI NASA Exoplanet Archive.The Kepler False Positive Table provides detailed information on the evidence for background binaries, transits caused by stellar companions, and false alarms. In addition to providing insight into the Kepler false positive population, the false positive table gives information about the background binary population and other areas of astrophysical interest. Because a planet around a star not associated with the target star is considered a false positive, the false positive table likely contains further planet candidates

  4. North Polar False Color

    NASA Technical Reports Server (NTRS)

    2005-01-01

    [figure removed for brevity, see original site]

    The theme for the weeks of 1/17 and 1/24 is the north polar region of Mars as seen in false color THEMIS images. Ice/frost will typically appear as bright blue in color; dust mantled ice will appear in tones of red/orange.

    This full resolution image contains dunes, and small areas of 'blue' which may represent fresh (ie. not dust covered) frost or ice.

    Image information: VIS instrument. Latitude 85, Longitude 235.8 East (124.2 West). 19 meter/pixel resolution.

    Note: this THEMIS visual image has not been radiometrically nor geometrically calibrated for this preliminary release. An empirical correction has been performed to remove instrumental effects. A linear shift has been applied in the cross-track and down-track direction to approximate spacecraft and planetary motion. Fully calibrated and geometrically projected images will be released through the Planetary Data System in accordance with Project policies at a later time.

    NASA's Jet Propulsion Laboratory manages the 2001 Mars Odyssey mission for NASA's Office of Space Science, Washington, D.C. The Thermal Emission Imaging System (THEMIS) was developed by Arizona State University, Tempe, in collaboration with Raytheon Santa Barbara Remote Sensing. The THEMIS investigation is led by Dr. Philip Christensen at Arizona State University. Lockheed Martin Astronautics, Denver, is the prime contractor for the Odyssey project, and developed and built the orbiter. Mission operations are conducted jointly from Lockheed Martin and from JPL, a division of the California Institute of Technology in Pasadena.

  5. Moon - False Color Mosaic

    NASA Technical Reports Server (NTRS)

    1992-01-01

    This false-color mosaic was constructed from a series of 53 images taken through three spectral filters by Galileo's imaging system as the spacecraft flew over the northern regions of the Moon on December 7, 1992. The part of the Moon visible from Earth is on the left side in this view. The color mosaic shows compositional variations in parts of the Moon's northern hemisphere. Bright pinkish areas are highlands materials, such as those surrounding the oval lava-filled Crisium impact basin toward the bottom of the picture. Blue to orange shades indicate volcanic lava flows. To the left of Crisium, the dark blue Mare Tranquillitatis is richer in titanium than the green and orange maria above it. Thin mineral-rich soils associated with relatively recent impacts are represented by light blue colors; the youngest craters have prominent blue rays extending from them. The Galileo project, whose primary mission is the exploration of the Jupiter system in 1995-97, is managed for NASA's Office of Space Science and Applications by the Jet Propulsion Laboratory.

  6. 14 CFR 1212.700 - NASA employees.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false NASA employees. 1212.700 Section 1212.700 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION PRIVACY ACT-NASA REGULATIONS NASA Authority and Responsibilities § 1212.700 NASA employees. (a) Each NASA employee is responsible for...

  7. 14 CFR 1212.700 - NASA employees.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false NASA employees. 1212.700 Section 1212.700 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION PRIVACY ACT-NASA REGULATIONS NASA Authority and Responsibilities § 1212.700 NASA employees. (a) Each NASA employee is responsible for...

  8. 14 CFR 1212.700 - NASA employees.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false NASA employees. 1212.700 Section 1212.700 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION PRIVACY ACT-NASA REGULATIONS NASA Authority and Responsibilities § 1212.700 NASA employees. (a) Each NASA employee is responsible for...

  9. NASA Quest.

    ERIC Educational Resources Information Center

    Ashby, Susanne

    2000-01-01

    Introduces NASA Quest as part of NASA's Learning Technologies Project, which connects students to the people of NASA through the various pages at the website where students can glimpse the various types of work performed at different NASA facilities and talk to NASA workers about the type of work they do. (ASK)

  10. Cape Verde in False Color

    NASA Technical Reports Server (NTRS)

    2007-01-01

    A promontory nicknamed 'Cape Verde' can be seen jutting out from the walls of Victoria Crater in this false-color picture taken by the panoramic camera on NASA's Mars Exploration Rover Opportunity. The rover took this picture on martian day, or sol, 1329 (Oct. 20, 2007), more than a month after it began descending down the crater walls -- and just 9 sols shy of its second Martian birthday on sol 1338 (Oct. 29, 2007). Opportunity landed on the Red Planet on Jan. 25, 2004. That's nearly four years ago on Earth, but only two on Mars because Mars takes longer to travel around the sun than Earth. One Martian year equals 687 Earth days.

    This view was taken using three panoramic-camera filters, admitting light with wavelengths centered at 750 nanometers (near infrared), 530 nanometers (green) and 430 nanometers (violet).

  11. Dusty Crater In False Color

    NASA Technical Reports Server (NTRS)

    2005-01-01

    [figure removed for brevity, see original site]

    The theme for the weeks of 1/17 and 1/24 is the north polar region of Mars as seen in false color THEMIS images. Ice/frost will typically appear as bright blue in color; dust mantled ice will appear in tones of red/orange.

    This false color image of a crater rim illustrates just how complete the dust cover can be. The small white/blue regions on the rim are of areas where the dust cover has been removed - due to heating on sun facing slopes or by gravitational effects.

    Image information: VIS instrument. Latitude 70.1, Longitude 352.8 East (7.2 West). 40 meter/pixel resolution.

    Note: this THEMIS visual image has not been radiometrically nor geometrically calibrated for this preliminary release. An empirical correction has been performed to remove instrumental effects. A linear shift has been applied in the cross-track and down-track direction to approximate spacecraft and planetary motion. Fully calibrated and geometrically projected images will be released through the Planetary Data System in accordance with Project policies at a later time.

    NASA's Jet Propulsion Laboratory manages the 2001 Mars Odyssey mission for NASA's Office of Space Science, Washington, D.C. The Thermal Emission Imaging System (THEMIS) was developed by Arizona State University, Tempe, in collaboration with Raytheon Santa Barbara Remote Sensing. The THEMIS investigation is led by Dr. Philip Christensen at Arizona State University. Lockheed Martin Astronautics, Denver, is the prime contractor for the Odyssey project, and developed and built the orbiter. Mission operations are conducted jointly from Lockheed Martin and from JPL, a division of the California Institute of Technology in Pasadena.

  12. 14 CFR 1221.109 - Use of the NASA Seal.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Use of the NASA Seal. 1221.109 Section 1221.109 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia, NASA Logotype, NASA...

  13. 14 CFR 1221.113 - Use of the NASA Flags.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Use of the NASA Flags. 1221.113 Section 1221.113 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia, NASA Logotype, NASA...

  14. 14 CFR 1221.109 - Use of the NASA Seal.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Use of the NASA Seal. 1221.109 Section 1221.109 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia, NASA Logotype, NASA...

  15. 14 CFR 1221.113 - Use of the NASA Flags.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Use of the NASA Flags. 1221.113 Section 1221.113 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia, NASA Logotype, NASA...

  16. 14 CFR 1221.110 - Use of the NASA Insignia.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false Use of the NASA Insignia. 1221.110 Section 1221.110 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia, NASA Logotype, NASA...

  17. 14 CFR 1221.111 - Use of the NASA Logotype.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Use of the NASA Logotype. 1221.111 Section 1221.111 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia, NASA Logotype, NASA...

  18. 14 CFR 1221.113 - Use of the NASA Flags.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false Use of the NASA Flags. 1221.113 Section 1221.113 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia, NASA Logotype, NASA...

  19. 14 CFR 1221.110 - Use of the NASA Insignia.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Use of the NASA Insignia. 1221.110 Section 1221.110 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia, NASA Logotype, NASA...

  20. 14 CFR 1221.110 - Use of the NASA Insignia.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Use of the NASA Insignia. 1221.110 Section 1221.110 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia, NASA Logotype, NASA...

  1. 14 CFR 1221.109 - Use of the NASA Seal.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false Use of the NASA Seal. 1221.109 Section 1221.109 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia, NASA Logotype, NASA...

  2. 14 CFR 1221.111 - Use of the NASA Logotype.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Use of the NASA Logotype. 1221.111 Section 1221.111 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia, NASA Logotype, NASA...

  3. 14 CFR 1221.111 - Use of the NASA Logotype.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false Use of the NASA Logotype. 1221.111 Section 1221.111 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia, NASA Logotype, NASA...

  4. Ice Surfaces In False Color

    NASA Technical Reports Server (NTRS)

    2005-01-01

    [figure removed for brevity, see original site]

    The theme for the weeks of 1/17 and 1/24 is the north polar region of Mars as seen in false color THEMIS images. Ice/frost will typically appear as bright blue in color; dust mantled ice will appear in tones of red/orange.

    This full resolution image shows a marked difference in the 'blueness' of the ice surfaces. The lower (presumably older) surface is oranger and the top (presumably younger) surface is blue. This may represent the fresher ice of the upper surface which has not yet covered with as much dust as the lower surface.

    Image information: VIS instrument. Latitude 80.8, Longitude 302.1 East (57.9 West). 19 meter/pixel resolution.

    Note: this THEMIS visual image has not been radiometrically nor geometrically calibrated for this preliminary release. An empirical correction has been performed to remove instrumental effects. A linear shift has been applied in the cross-track and down-track direction to approximate spacecraft and planetary motion. Fully calibrated and geometrically projected images will be released through the Planetary Data System in accordance with Project policies at a later time.

    NASA's Jet Propulsion Laboratory manages the 2001 Mars Odyssey mission for NASA's Office of Space Science, Washington, D.C. The Thermal Emission Imaging System (THEMIS) was developed by Arizona State University, Tempe, in collaboration with Raytheon Santa Barbara Remote Sensing. The THEMIS investigation is led by Dr. Philip Christensen at Arizona State University. Lockheed Martin Astronautics, Denver, is the prime contractor for the Odyssey project, and developed and built the orbiter. Mission operations are conducted jointly from Lockheed Martin and from JPL, a division of the California Institute of Technology in Pasadena.

  5. Polar Layers in False Color

    NASA Technical Reports Server (NTRS)

    2005-01-01

    [figure removed for brevity, see original site]

    The theme for the weeks of 1/17 and 1/24 is the north polar region of Mars as seen in false color THEMIS images. Ice/frost will typically appear as bright blue in color; dust mantled ice will appear in tones of red/orange.

    This image again illustrates the oranger/bluer nature of the polar layers.

    Image information: VIS instrument. Latitude 80.6, Longitude 70.2 East (289.8 West). 40 meter/pixel resolution.

    Note: this THEMIS visual image has not been radiometrically nor geometrically calibrated for this preliminary release. An empirical correction has been performed to remove instrumental effects. A linear shift has been applied in the cross-track and down-track direction to approximate spacecraft and planetary motion. Fully calibrated and geometrically projected images will be released through the Planetary Data System in accordance with Project policies at a later time.

    NASA's Jet Propulsion Laboratory manages the 2001 Mars Odyssey mission for NASA's Office of Space Science, Washington, D.C. The Thermal Emission Imaging System (THEMIS) was developed by Arizona State University, Tempe, in collaboration with Raytheon Santa Barbara Remote Sensing. The THEMIS investigation is led by Dr. Philip Christensen at Arizona State University. Lockheed Martin Astronautics, Denver, is the prime contractor for the Odyssey project, and developed and built the orbiter. Mission operations are conducted jointly from Lockheed Martin and from JPL, a division of the California Institute of Technology in Pasadena.

  6. Sand Sea in False Color

    NASA Technical Reports Server (NTRS)

    2005-01-01

    [figure removed for brevity, see original site]

    The theme for the weeks of 1/17 and 1/24 is the north polar region of Mars as seen in false color THEMIS images. Ice/frost will typically appear as bright blue in color; dust mantled ice will appear in tones of red/orange.

    This image is of part of the northern sand sea. The small dunes in the image are bluer than the ice/dust filled central crater.

    Image information: VIS instrument. Latitude 73.7, Longitude 323 East (37 West). 40 meter/pixel resolution.

    Note: this THEMIS visual image has not been radiometrically nor geometrically calibrated for this preliminary release. An empirical correction has been performed to remove instrumental effects. A linear shift has been applied in the cross-track and down-track direction to approximate spacecraft and planetary motion. Fully calibrated and geometrically projected images will be released through the Planetary Data System in accordance with Project policies at a later time.

    NASA's Jet Propulsion Laboratory manages the 2001 Mars Odyssey mission for NASA's Office of Space Science, Washington, D.C. The Thermal Emission Imaging System (THEMIS) was developed by Arizona State University, Tempe, in collaboration with Raytheon Santa Barbara Remote Sensing. The THEMIS investigation is led by Dr. Philip Christensen at Arizona State University. Lockheed Martin Astronautics, Denver, is the prime contractor for the Odyssey project, and developed and built the orbiter. Mission operations are conducted jointly from Lockheed Martin and from JPL, a division of the California Institute of Technology in Pasadena.

  7. Mimas Showing False Colors #2

    NASA Technical Reports Server (NTRS)

    2005-01-01

    This false color image of Saturn's moon Mimas reveals variation in either the composition or texture across its surface.

    During its approach to Mimas on Aug. 2, 2005, the Cassini spacecraft narrow-angle camera obtained multi-spectral views of the moon from a range of 228,000 kilometers (142,500 miles).

    This image is a color composite of narrow-angle ultraviolet, green, infrared and clear filter images, which have been specially processed to accentuate subtle changes in the spectral properties of Mimas' surface materials. To create this view, three color images (ultraviolet, green and infrared) were combined with a single black and white picture that isolates and maps regional color differences to create the final product.

    Shades of blue and violet in the image at the right are used to identify surface materials that are bluer in color and have a weaker infrared brightness than average Mimas materials, which are represented by green.

    Herschel crater, a 140-kilometer-wide (88-mile) impact feature with a prominent central peak, is visible in the upper right of the image. The unusual bluer materials are seen to broadly surround Herschel crater. However, the bluer material is not uniformly distributed in and around the crater. Instead, it appears to be concentrated on the outside of the crater and more to the west than to the north or south. The origin of the color differences is not yet understood. It may represent ejecta material that was excavated from inside Mimas when the Herschel impact occurred. The bluer color of these materials may be caused by subtle differences in the surface composition or the sizes of grains making up the icy soil.

    This image was obtained when the Cassini spacecraft was above 25 degrees south, 134 degrees west latitude and longitude. The Sun-Mimas-spacecraft angle was 45 degrees and north is at the top.

    The Cassini-Huygens mission is a cooperative project of NASA, the European Space Agency and the Italian

  8. False color viewing device

    DOEpatents

    Kronberg, J.W.

    1992-10-20

    A viewing device for observing objects in near-infrared false-color comprising a pair of goggles with one or more filters in the apertures, and pads that engage the face for blocking stray light from the sides so that all light reaching the user's eyes come through the filters. The filters attenuate most visible light and pass near-infrared (having wavelengths longer than approximately 700 nm) and a small amount of blue-green and blue-violet (having wavelengths in the 500 to 520 nm and shorter than 435 nm, respectively). The goggles are useful for looking at vegetation to identify different species and for determining the health of the vegetation, and to detect some forms of camouflage. 7 figs.

  9. False color viewing device

    DOEpatents

    Kronberg, James W.

    1992-01-01

    A viewing device for observing objects in near-infrared false-color comprising a pair of goggles with one or more filters in the apertures, and pads that engage the face for blocking stray light from the sides so that all light reaching the user's eyes come through the filters. The filters attenuate most visible light and pass near-infrared (having wavelengths longer than approximately 700 nm) and a small amount of blue-green and blue-violet (having wavelengths in the 500 to 520 nm and shorter than 435 nm, respectively). The goggles are useful for looking at vegetation to identify different species and for determining the health of the vegetation, and to detect some forms of camouflage.

  10. False color viewing device

    DOEpatents

    Kronberg, J.W.

    1991-05-08

    This invention consists of a viewing device for observing objects in near-infrared false-color comprising a pair of goggles with one or more filters in the apertures, and pads that engage the face for blocking stray light from the sides so that all light reaching, the user`s eyes come through the filters. The filters attenuate most visible light and pass near-infrared (having wavelengths longer than approximately 700 nm) and a small amount of blue-green and blue-violet (having wavelengths in the 500 to 520 nm and shorter than 435 nm, respectively). The goggles are useful for looking at vegetation to identify different species and for determining the health of the vegetation, and to detect some forms of camouflage.

  11. Southern Spring in False Color

    NASA Technical Reports Server (NTRS)

    2004-01-01

    [figure removed for brevity, see original site]

    The Odyssey spacecraft has completed a full Mars year of observations of the red planet. For the next several weeks the Image of the Day will look back over this first mars year. It will focus on four themes: 1) the poles - with the seasonal changes seen in the retreat and expansion of the caps; 2) craters - with a variety of morphologies relating to impact materials and later alteration, both infilling and exhumation; 3) channels - the clues to liquid surface flow; and 4) volcanic flow features. While some images have helped answer questions about the history of Mars, many have raised new questions that are still being investigated as Odyssey continues collecting data as it orbits Mars.

    This image was collected June 25, 2003 during the southern spring season. This false color image shows both the layered ice cap and darker 'spots' that are seen only when the sun first lights the polar surface.

    Image information: VIS instrument. Latitude -82.3, Longitude 306 East (54 West). 19 meter/pixel resolution.

    Note: this THEMIS visual image has not been radiometrically nor geometrically calibrated for this preliminary release. An empirical correction has been performed to remove instrumental effects. A linear shift has been applied in the cross-track and down-track direction to approximate spacecraft and planetary motion. Fully calibrated and geometrically projected images will be released through the Planetary Data System in accordance with Project policies at a later time.

    NASA's Jet Propulsion Laboratory manages the 2001 Mars Odyssey mission for NASA's Office of Space Science, Washington, D.C. The Thermal Emission Imaging System (THEMIS) was developed by Arizona State University, Tempe, in collaboration with Raytheon Santa Barbara Remote Sensing. The THEMIS investigation is led by Dr. Philip Christensen at Arizona State University. Lockheed Martin Astronautics, Denver, is the prime contractor for the

  12. White Rock in False Color

    NASA Technical Reports Server (NTRS)

    2005-01-01

    [figure removed for brevity, see original site]

    The THEMIS VIS camera is capable of capturing color images of the Martian surface using five different color filters. In this mode of operation, the spatial resolution and coverage of the image must be reduced to accommodate the additional data volume produced from using multiple filters. To make a color image, three of the five filter images (each in grayscale) are selected. Each is contrast enhanced and then converted to a red, green, or blue intensity image. These three images are then combined to produce a full color, single image. Because the THEMIS color filters don't span the full range of colors seen by the human eye, a color THEMIS image does not represent true color. Also, because each single-filter image is contrast enhanced before inclusion in the three-color image, the apparent color variation of the scene is exaggerated. Nevertheless, the color variation that does appear is representative of some change in color, however subtle, in the actual scene. Note that the long edges of THEMIS color images typically contain color artifacts that do not represent surface variation.

    This false color image shows the wind eroded deposit in Pollack Crater called 'White Rock'. This image was collected during the Southern Fall Season.

    Image information: VIS instrument. Latitude -8, Longitude 25.2 East (334.8 West). 0 meter/pixel resolution.

    Note: this THEMIS visual image has not been radiometrically nor geometrically calibrated for this preliminary release. An empirical correction has been performed to remove instrumental effects. A linear shift has been applied in the cross-track and down-track direction to approximate spacecraft and planetary motion. Fully calibrated and geometrically projected images will be released through the Planetary Data System in accordance with Project policies at a later time.

    NASA's Jet Propulsion Laboratory manages the 2001 Mars Odyssey mission for NASA's Office of

  13. Iani Chaos in False Color

    NASA Technical Reports Server (NTRS)

    2005-01-01

    [figure removed for brevity, see original site]

    The THEMIS VIS camera is capable of capturing color images of the Martian surface using five different color filters. In this mode of operation, the spatial resolution and coverage of the image must be reduced to accommodate the additional data volume produced from using multiple filters. To make a color image, three of the five filter images (each in grayscale) are selected. Each is contrast enhanced and then converted to a red, green, or blue intensity image. These three images are then combined to produce a full color, single image. Because the THEMIS color filters don't span the full range of colors seen by the human eye, a color THEMIS image does not represent true color. Also, because each single-filter image is contrast enhanced before inclusion in the three-color image, the apparent color variation of the scene is exaggerated. Nevertheless, the color variation that does appear is representative of some change in color, however subtle, in the actual scene. Note that the long edges of THEMIS color images typically contain color artifacts that do not represent surface variation.

    This false color image of a portion of the Iani Chaos region was collected during the Southern Fall season.

    Image information: VIS instrument. Latitude -2.6 Longitude 342.4 East (17.6 West). 36 meter/pixel resolution.

    Note: this THEMIS visual image has not been radiometrically nor geometrically calibrated for this preliminary release. An empirical correction has been performed to remove instrumental effects. A linear shift has been applied in the cross-track and down-track direction to approximate spacecraft and planetary motion. Fully calibrated and geometrically projected images will be released through the Planetary Data System in accordance with Project policies at a later time.

    NASA's Jet Propulsion Laboratory manages the 2001 Mars Odyssey mission for NASA's Office of Space Science, Washington, D.C. The

  14. NASA Network

    NASA Technical Reports Server (NTRS)

    Carter, David; Wetzel, Scott

    2000-01-01

    The NASA Network includes nine NASA operated and partner operated stations covering North America, the west coast of South America, the Pacific, and Western Australia . A new station is presently being setup in South Africa and discussions are underway to add another station in Argentina. NASA SLR operations are supported by Honeywell Technical Solutions, Inc (HTSI), formally AlliedSignal Technical Services, The University of Texas, the University of Hawaii and Universidad Nacional de San Agustin.

  15. NASA Solve

    NASA Video Gallery

    NASA Solve lists opportunities available to the general public to contribute to solving tough problems related to NASA’s mission through challenges, prize competitions, and crowdsourcing activities...

  16. Innovation @ NASA

    NASA Technical Reports Server (NTRS)

    Roman, Juan A.

    2014-01-01

    This presentation provides an overview of the activities National Aeronautics and Space Administration (NASA) is doing to encourage innovation across the agency. All information provided is available publicly.

  17. Mimas Showing False Colors #1

    NASA Technical Reports Server (NTRS)

    2005-01-01

    False color images of Saturn's moon, Mimas, reveal variation in either the composition or texture across its surface.

    During its approach to Mimas on Aug. 2, 2005, the Cassini spacecraft narrow-angle camera obtained multi-spectral views of the moon from a range of 228,000 kilometers (142,500 miles).

    The image at the left is a narrow angle clear-filter image, which was separately processed to enhance the contrast in brightness and sharpness of visible features. The image at the right is a color composite of narrow-angle ultraviolet, green, infrared and clear filter images, which have been specially processed to accentuate subtle changes in the spectral properties of Mimas' surface materials. To create this view, three color images (ultraviolet, green and infrared) were combined into a single black and white picture that isolates and maps regional color differences. This 'color map' was then superimposed over the clear-filter image at the left.

    The combination of color map and brightness image shows how the color differences across the Mimas surface materials are tied to geological features. Shades of blue and violet in the image at the right are used to identify surface materials that are bluer in color and have a weaker infrared brightness than average Mimas materials, which are represented by green.

    Herschel crater, a 140-kilometer-wide (88-mile) impact feature with a prominent central peak, is visible in the upper right of each image. The unusual bluer materials are seen to broadly surround Herschel crater. However, the bluer material is not uniformly distributed in and around the crater. Instead, it appears to be concentrated on the outside of the crater and more to the west than to the north or south. The origin of the color differences is not yet understood. It may represent ejecta material that was excavated from inside Mimas when the Herschel impact occurred. The bluer color of these materials may be caused by subtle differences in

  18. 14 CFR 1245.302 - Inventions by NASA employees.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Inventions by NASA employees. 1245.302... INTELLECTUAL PROPERTY RIGHTS NASA Foreign Patent Program § 1245.302 Inventions by NASA employees. (a) The foreign rights of NASA and of the NASA employee making an invention are determinable in accordance...

  19. 14 CFR 1221.106 - Establishment of the NASA Flag.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false Establishment of the NASA Flag. 1221.106 Section 1221.106 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia, NASA Logotype,...

  20. 14 CFR 1221.104 - Establishment of the NASA Logotype.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Establishment of the NASA Logotype. 1221.104 Section 1221.104 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia, NASA...

  1. 14 CFR § 1245.302 - Inventions by NASA employees.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false Inventions by NASA employees. § 1245.302... INTELLECTUAL PROPERTY RIGHTS NASA Foreign Patent Program § 1245.302 Inventions by NASA employees. (a) The foreign rights of NASA and of the NASA employee making an invention are determinable in accordance...

  2. 14 CFR 1221.106 - Establishment of the NASA Flag.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Establishment of the NASA Flag. 1221.106 Section 1221.106 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia, NASA Logotype,...

  3. 14 CFR 1215.112 - User/NASA contractual arrangement.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false User/NASA contractual arrangement. 1215.112... User/NASA contractual arrangement. (a) The NASA Administrator reserves the right to waive any portion of the reimbursement due to NASA under the provisions of the reimbursement policy. (b) When NASA...

  4. 14 CFR 1221.106 - Establishment of the NASA Flag.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Establishment of the NASA Flag. 1221.106 Section 1221.106 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia, NASA Logotype,...

  5. 14 CFR 1245.302 - Inventions by NASA employees.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Inventions by NASA employees. 1245.302... INTELLECTUAL PROPERTY RIGHTS NASA Foreign Patent Program § 1245.302 Inventions by NASA employees. (a) The foreign rights of NASA and of the NASA employee making an invention are determinable in accordance...

  6. 14 CFR § 1212.700 - NASA employees.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false NASA employees. § 1212.700 Section § 1212.700 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION PRIVACY ACT-NASA REGULATIONS NASA Authority and Responsibilities § 1212.700 NASA employees. (a) Each NASA employee is...

  7. 14 CFR 1203.101 - Other applicable NASA regulations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false Other applicable NASA regulations. 1203.101... PROGRAM Scope § 1203.101 Other applicable NASA regulations. (a) Subpart H of this part, “Delegation of..., “NASA Information Security Program Committee.” (c) NASA Handbook 1620.3, “NASA Physical...

  8. 14 CFR 1203.101 - Other applicable NASA regulations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Other applicable NASA regulations. 1203.101... PROGRAM Scope § 1203.101 Other applicable NASA regulations. (a) Subpart H of this part, “Delegation of..., “NASA Information Security Program Committee.” (c) NASA Handbook 1620.3, “NASA Physical...

  9. 14 CFR 1221.104 - Establishment of the NASA Logotype.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Establishment of the NASA Logotype. 1221.104 Section 1221.104 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia, NASA...

  10. 14 CFR 1221.103 - Establishment of the NASA Insignia.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false Establishment of the NASA Insignia. 1221.103 Section 1221.103 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia, NASA...

  11. 14 CFR 1221.102 - Establishment of the NASA Seal.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Establishment of the NASA Seal. 1221.102 Section 1221.102 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia, NASA Logotype,...

  12. 14 CFR 1203.101 - Other applicable NASA regulations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Other applicable NASA regulations. 1203.101... PROGRAM Scope § 1203.101 Other applicable NASA regulations. (a) Subpart H of this part, “Delegation of..., “NASA Information Security Program Committee.” (c) NASA Handbook 1620.3, “NASA Physical...

  13. 14 CFR 1245.302 - Inventions by NASA employees.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false Inventions by NASA employees. 1245.302... INTELLECTUAL PROPERTY RIGHTS NASA Foreign Patent Program § 1245.302 Inventions by NASA employees. (a) The foreign rights of NASA and of the NASA employee making an invention are determinable in accordance...

  14. 14 CFR 1221.103 - Establishment of the NASA Insignia.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Establishment of the NASA Insignia. 1221.103 Section 1221.103 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia, NASA...

  15. 14 CFR 1221.102 - Establishment of the NASA Seal.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false Establishment of the NASA Seal. 1221.102 Section 1221.102 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia, NASA Logotype,...

  16. 14 CFR 1212.703 - NASA Chief Information Officer.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false NASA Chief Information Officer. 1212.703 Section 1212.703 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION PRIVACY ACT-NASA REGULATIONS NASA Authority and Responsibilities § 1212.703 NASA Chief Information Officer. (a) The NASA...

  17. 14 CFR 1215.112 - User/NASA contractual arrangement.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false User/NASA contractual arrangement. 1215.112... User/NASA contractual arrangement. (a) The NASA Administrator reserves the right to waive any portion of the reimbursement due to NASA under the provisions of the reimbursement policy. (b) When NASA...

  18. 14 CFR § 1212.703 - NASA Chief Information Officer.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false NASA Chief Information Officer. § 1212.703 Section § 1212.703 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION PRIVACY ACT-NASA REGULATIONS NASA Authority and Responsibilities § 1212.703 NASA Chief Information Officer. (a) The NASA...

  19. 14 CFR 1221.102 - Establishment of the NASA Seal.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Establishment of the NASA Seal. 1221.102 Section 1221.102 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia, NASA Logotype,...

  20. 14 CFR 1221.104 - Establishment of the NASA Logotype.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false Establishment of the NASA Logotype. 1221.104 Section 1221.104 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia, NASA...

  1. NASA Vision

    NASA Technical Reports Server (NTRS)

    Prior, Edwin J.

    2003-01-01

    The political, economic, and enivronmental conditions of the twenty-first century demand new goals for NASA. These goals include the imaging of habitable extrasolar planets, expanded commercialization of low earth orbit, clean and rapid air transportation, environment protection, and distance learning. The presentation recommends strategies for pursuing these goals, and summarizes activities at NASA Langley Research Center (LaRC).

  2. 14 CFR § 1221.105 - Establishment of NASA Program Identifiers.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false Establishment of NASA Program Identifiers... THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia, NASA Logotype, NASA Program Identifiers, NASA Flags, and the Agency's Unified Visual...

  3. 14 CFR 1221.108 - Establishment of the NASA Unified Visual Communications System.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false Establishment of the NASA Unified Visual... ADMINISTRATION THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia, NASA Logotype, NASA Program Identifiers, NASA Flags, and the Agency's Unified...

  4. 14 CFR § 1221.112 - Use of the NASA Program Identifiers.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false Use of the NASA Program Identifiers. Â... NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia, NASA Logotype, NASA Program Identifiers, NASA Flags, and the Agency's Unified Visual Communications...

  5. 14 CFR 1221.108 - Establishment of the NASA Unified Visual Communications System.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Establishment of the NASA Unified Visual... ADMINISTRATION THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia, NASA Logotype, NASA Program Identifiers, NASA Flags, and the Agency's Unified...

  6. 14 CFR § 1221.108 - Establishment of the NASA Unified Visual Communications System.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false Establishment of the NASA Unified Visual... ADMINISTRATION THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia, NASA Logotype, NASA Program Identifiers, NASA Flags, and the Agency's Unified...

  7. 14 CFR 1206.503 - NASA Headquarters.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false NASA Headquarters. 1206.503 Section 1206... TO MEMBERS OF THE PUBLIC Responsibilities § 1206.503 NASA Headquarters. (a) Except as otherwise... throughout NASA to facilitate the preparation of such reports; (2) After consultation with the Office...

  8. 14 CFR 1206.503 - NASA Headquarters.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false NASA Headquarters. 1206.503 Section 1206... TO MEMBERS OF THE PUBLIC Responsibilities § 1206.503 NASA Headquarters. (a) Except as otherwise... throughout NASA to facilitate the preparation of such reports; (2) After consultation with the Office...

  9. 14 CFR 1206.503 - NASA Headquarters.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false NASA Headquarters. 1206.503 Section 1206... TO MEMBERS OF THE PUBLIC Responsibilities § 1206.503 NASA Headquarters. (a) Except as otherwise... throughout NASA to facilitate the preparation of such reports; (2) After consultation with the Office...

  10. NASA Vision

    NASA Technical Reports Server (NTRS)

    Fenton, Mary (Editor); Wood, Jennifer (Editor)

    2003-01-01

    This newsletter contains several articles, primarily on International Space Station (ISS) crewmembers and their activities, as well as the activities of NASA administrators. Other subjects covered in the articles include the investigation of the Space Shuttle Columbia accident, activities at NASA centers, Mars exploration, a collision avoidance test on a unmanned aerial vehicle (UAV). The ISS articles cover landing in a Soyuz capsule, photography from the ISS, and the Expedition Seven crew.

  11. Positive consequences of false memories.

    PubMed

    Howe, Mark L; Garner, Sarah R; Patel, Megan

    2013-01-01

    Previous research is replete with examples of the negative consequences of false memories. In the current research, we provide a different perspective on false memories and their development and demonstrate that false memories can have positive consequences. Specifically, we examined the role false memories play in subsequent problem-solving tasks. Children and adults studied and recalled neutral or survival-relevant lists of associated words. They then solved age-normed compound remote associates, some of whose solutions had been primed by false memories created when studying the previous lists. The results showed that regardless of age: (a) survival-related words were not only better recollected but were also more susceptible than neutral words to false memory illusions; and (b) survival-related false memories were better than neutral false memories as primes for problem-solving. These findings are discussed in the context of recent speculation concerning the positive consequences of false memories, and the adaptive nature of reconstructive memory.

  12. False Position, Double False Position and Cramer's Rule

    ERIC Educational Resources Information Center

    Boman, Eugene

    2009-01-01

    We state and prove the methods of False Position (Regula Falsa) and Double False Position (Regula Duorum Falsorum). The history of both is traced from ancient Egypt and China through the work of Fibonacci, ending with a connection between Double False Position and Cramer's Rule.

  13. Spirit Beholds Bumpy Boulder (False Color)

    NASA Technical Reports Server (NTRS)

    2006-01-01

    As NASA's Mars Exploration Rover Spirit began collecting images for a 360-degree panorama of new terrain, the rover captured this view of a dark boulder with an interesting surface texture. The boulder sits about 40 centimeters (16 inches) tall on Martian sand about 5 meters (16 feet) away from Spirit. It is one of many dark, volcanic rock fragments -- many pocked with rounded holes called vesicles -- littering the slope of 'Low Ridge.' The rock surface facing the rover is similar in appearance to the surface texture on the outside of lava flows on Earth.

    Spirit took this false-color image with the panoramic camera on the rover's 810th sol, or Martian day, of exploring Mars (April 13, 2006). This image is a false-color rendering using camera's 753-nanometer, 535-nanometer, and 432-nanometer filters.

  14. NASA Bioreactor

    NASA Technical Reports Server (NTRS)

    1996-01-01

    Close-up view of the interior of a NASA Bioreactor shows the plastic plumbing and valves (cylinders at center) to control fluid flow. A fresh nutrient bag is installed at top; a flattened waste bag behind it will fill as the nutrients are consumed during the course of operation. The drive chain and gears for the rotating wall vessel are visible at bottom center center. The NASA Bioreactor provides a low turbulence culture environment which promotes the formation of large, three-dimensional cell clusters. The Bioreactor is rotated to provide gentle mixing of fresh and spent nutrient without inducing shear forces that would damage the cells. Due to their high level of cellular organization and specialization, samples constructed in the bioreactor more closely resemble the original tumor or tissue found in the body. The work is sponsored by NASA's Office of Biological and Physical Research. The bioreactor is managed by the Biotechnology Cell Science Program at NASA's Johnson Space Center (JSC). NASA-sponsored bioreactor research has been instrumental in helping scientists to better understand normal and cancerous tissue development. In cooperation with the medical community, the bioreactor design is being used to prepare better models of human colon, prostate, breast and ovarian tumors. Cartilage, bone marrow, heart muscle, skeletal muscle, pancreatic islet cells, liver and kidney are just a few of the normal tissues being cultured in rotating bioreactors by investigators.

  15. NASA Bioreactor

    NASA Technical Reports Server (NTRS)

    1996-01-01

    Close-up view of the interior of a NASA Bioreactor shows the plastic plumbing and valves (cylinders at right center) to control fluid flow. The rotating wall vessel is at top center. The NASA Bioreactor provides a low turbulence culture environment which promotes the formation of large, three-dimensional cell clusters. The Bioreactor is rotated to provide gentle mixing of fresh and spent nutrient without inducing shear forces that would damage the cells. Due to their high level of cellular organization and specialization, samples constructed in the bioreactor more closely resemble the original tumor or tissue found in the body. The work is sponsored by NASA's Office of Biological and Physical Research. The bioreactor is managed by the Biotechnology Cell Science Program at NASA's Johnson Space Center (JSC). NASA-sponsored bioreactor research has been instrumental in helping scientists to better understand normal and cancerous tissue development. In cooperation with the medical community, the bioreactor design is being used to prepare better models of human colon, prostate, breast and ovarian tumors. Cartilage, bone marrow, heart muscle, skeletal muscle, pancreatic islet cells, liver and kidney are just a few of the normal tissues being cultured in rotating bioreactors by investigators.

  16. NASA Bioreactor

    NASA Technical Reports Server (NTRS)

    1996-01-01

    Electronics control module for the NASA Bioreactor. The NASA Bioreactor provides a low turbulence culture environment which promotes the formation of large, three-dimensional cell clusters. The Bioreactor is rotated to provide gentle mixing of fresh and spent nutrient without inducing shear forces that would damage the cells. Due to their high level of cellular organization and specialization, samples constructed in the bioreactor more closely resemble the original tumor or tissue found in the body. The work is sponsored by NASA's Office of Biological and Physical Research. The bioreactor is managed by the Biotechnology Cell Science Program at NASA's Johnson Space Center (JSC). NASA-sponsored bioreactor research has been instrumental in helping scientists to better understand normal and cancerous tissue development. In cooperation with the medical community, the bioreactor design is being used to prepare better models of human colon, prostate, breast and ovarian tumors. Cartilage, bone marrow, heart muscle, skeletal muscle, pancreatic islet cells, liver and kidney are just a few of the normal tissues being cultured in rotating bioreactors by investigators.

  17. NASA Bioreactor

    NASA Technical Reports Server (NTRS)

    1996-01-01

    Interior of a Biotechnology Refrigerator that preserves samples for use in (or after culturing in) the NASA Bioreactor. The unit is shown extracted from a middeck locker shell. The NASA Bioreactor provides a low turbulence culture environment which promotes the formation of large, three-dimensional cell clusters. The Bioreactor is rotated to provide gentle mixing of fresh and spent nutrient without inducing shear forces that would damage the cells. Due to their high level of cellular organization and specialization, samples constructed in the bioreactor more closely resemble the original tumor or tissue found in the body. The work is sponsored by NASA's Office of Biological and Physical Research. The bioreactor is managed by the Biotechnology Cell Science Program at NASA's Johnson Space Center (JSC). NASA-sponsored bioreactor research has been instrumental in helping scientists to better understand normal and cancerous tissue development. In cooperation with the medical community, the bioreactor design is being used to prepare better models of human colon, prostate, breast and ovarian tumors. Cartilage, bone marrow, heart muscle, skeletal muscle, pancreatic islet cells, liver and kidney are just a few of the normal tissues being cultured in rotating bioreactors by investigators.

  18. NASA Bioreactor

    NASA Technical Reports Server (NTRS)

    1996-01-01

    Biotechnology Refrigerator that preserves samples for use in (or after culturing in) the NASA Bioreactor. The unit is shown extracted from a middeck locker shell. The NASA Bioreactor provides a low turbulence culture environment which promotes the formation of large, three-dimensional cell clusters. The Bioreactor is rotated to provide gentle mixing of fresh and spent nutrient without inducing shear forces that would damage the cells. Due to their high level of cellular organization and specialization, samples constructed in the bioreactor more closely resemble the original tumor or tissue found in the body. The work is sponsored by NASA's Office of Biological and Physical Research. The bioreactor is managed by the Biotechnology Cell Science Program at NASA's Johnson Space Center (JSC). NASA-sponsored bioreactor research has been instrumental in helping scientists to better understand normal and cancerous tissue development. In cooperation with the medical community, the bioreactor design is being used to prepare better models of human colon, prostate, breast and ovarian tumors. Cartilage, bone marrow, heart muscle, skeletal muscle, pancreatic islet cells, liver and kidney are just a few of the normal tissues being cultured in rotating bioreactors by investigators.

  19. NASA Bioreactor

    NASA Technical Reports Server (NTRS)

    1996-01-01

    Interior view of the gas supply for the NASA Bioreactor. The NASA Bioreactor provides a low turbulence culture environment which promotes the formation of large, three-dimensional cell clusters. The Bioreactor is rotated to provide gentle mixing of fresh and spent nutrient without inducing shear forces that would damage the cells. Due to their high level of cellular organization and specialization, samples constructed in the bioreactor more closely resemble the original tumor or tissue found in the body. The work is sponsored by NASA's Office of Biological and Physical Research. The bioreactor is managed by the Biotechnology Cell Science Program at NASA's Johnson Space Center (JSC). NASA-sponsored bioreactor research has been instrumental in helping scientists to better understand normal and cancerous tissue development. In cooperation with the medical community, the bioreactor design is being used to prepare better models of human colon, prostate, breast and ovarian tumors. Cartilage, bone marrow, heart muscle, skeletal muscle, pancreatic islet cells, liver and kidney are just a few of the normal tissues being cultured in rotating bioreactors by investigators.

  20. NASA Bioreactor

    NASA Technical Reports Server (NTRS)

    1996-01-01

    Biotechnology Refrigerator that preserves samples for use in (or after culturing in) the NASA Bioreactor. The unit is shown extracted from a middeck locker shell and with thermal blankets partially removed. The NASA Bioreactor provides a low turbulence culture environment which promotes the formation of large, three-dimensional cell clusters. The Bioreactor is rotated to provide gentle mixing of fresh and spent nutrient without inducing shear forces that would damage the cells. Due to their high level of cellular organization and specialization, samples constructed in the bioreactor more closely resemble the original tumor or tissue found in the body. The work is sponsored by NASA's Office of Biological and Physical Research. The bioreactor is managed by the Biotechnology Cell Science Program at NASA's Johnson Space Center (JSC). NASA-sponsored bioreactor research has been instrumental in helping scientists to better understand normal and cancerous tissue development. In cooperation with the medical community, the bioreactor design is being used to prepare better models of human colon, prostate, breast and ovarian tumors. Cartilage, bone marrow, heart muscle, skeletal muscle, pancreatic islet cells, liver and kidney are just a few of the normal tissues being cultured in rotating bioreactors by investigators.

  1. NASA Bioreactor

    NASA Technical Reports Server (NTRS)

    1996-01-01

    Laptop computer sits atop the Experiment Control Computer for a NASA Bioreactor. The flight crew can change operating conditions in the Bioreactor by using the graphical interface on the laptop. The NASA Bioreactor provides a low turbulence culture environment which promotes the formation of large, three-dimensional cell clusters. The Bioreactor is rotated to provide gentle mixing of fresh and spent nutrient without inducing shear forces that would damage the cells. Due to their high level of cellular organization and specialization, samples constructed in the bioreactor more closely resemble the original tumor or tissue found in the body. The work is sponsored by NASA's Office of Biological and Physical Research. The bioreactor is managed by the Biotechnology Cell Science Program at NASA's Johnson Space Center (JSC). NASA-sponsored bioreactor research has been instrumental in helping scientists to better understand normal and cancerous tissue development. In cooperation with the medical community, the bioreactor design is being used to prepare better models of human colon, prostate, breast and ovarian tumors. Cartilage, bone marrow, heart muscle, skeletal muscle, pancreatic islet cells, liver and kidney are just a few of the normal tissues being cultured in rotating bioreactors by investigators.

  2. NASA Bioreactor

    NASA Technical Reports Server (NTRS)

    1996-01-01

    Exterior view of the NASA Bioreactor Engineering Development Unit flown on Mir. The rotating wall vessel is behind the window on the face of the large module. Control electronics are in the module at left; gas supply and cooling fans are in the module at back. The NASA Bioreactor provides a low turbulence culture environment which promotes the formation of large, three-dimensional cell clusters. The Bioreactor is rotated to provide gentle mixing of fresh and spent nutrient without inducing shear forces that would damage the cells. Due to their high level of cellular organization and specialization, samples constructed in the bioreactor more closely resemble the original tumor or tissue found in the body. The work is sponsored by NASA's Office of Biological and Physical Research. The bioreactor is managed by the Biotechnology Cell Science Program at NASA's Johnson Space Center (JSC). NASA-sponsored bioreactor research has been instrumental in helping scientists to better understand normal and cancerous tissue development. In cooperation with the medical community, the bioreactor design is being used to prepare better models of human colon, prostate, breast and ovarian tumors. Cartilage, bone marrow, heart muscle, skeletal muscle, pancreatic islet cells, liver and kidney are just a few of the normal tissues being cultured in rotating bioreactors by investigators.

  3. False memories for aggressive acts.

    PubMed

    Laney, Cara; Takarangi, Melanie K T

    2013-06-01

    Can people develop false memories for committing aggressive acts? How does this process compare to developing false memories for victimhood? In the current research we used a simple false feedback procedure to implant false memories for committing aggressive acts (causing a black eye or spreading malicious gossip) or for victimhood (receiving a black eye). We then compared these false memories to other subjects' true memories for equivalent events. False aggressive memories were all too easy to implant, particularly in the minds of individuals with a proclivity towards aggression. Once implanted, the false memories were indistinguishable from true memories for the same events, on several dimensions, including emotional content. Implications for aggression-related memory more generally as well as false confessions are discussed.

  4. NASA Bioreactor

    NASA Technical Reports Server (NTRS)

    1998-01-01

    Astronaut John Blaha replaces an exhausted media bag and filled waste bag with fresh bags to continue a bioreactor experiment aboard space station Mir in 1996. NASA-sponsored bioreactor research has been instrumental in helping scientists to better understand normal and cancerous tissue development. In cooperation with the medical community, the bioreactor design is being used to prepare better models of human colon, prostate, breast and ovarian tumors. Cartilage, bone marrow, heart muscle, skeletal muscle, pancreatic islet cells, liver and kidney are just a few of the normal tissues being cultured in rotating bioreactors by investigators. This image is from a video downlink. The work is sponsored by NASA's Office of Biological and Physical Research. The bioreactor is managed by the Biotechnology Cell Science Program at NASA's Johnson Space Center (JSC).

  5. NASA Bioreactor

    NASA Technical Reports Server (NTRS)

    1998-01-01

    The heart of the bioreactor is the rotating wall vessel, shown without its support equipment. Volume is about 125 mL. The work is sponsored by NASA's Office of Biological and Physical Research. The bioreactor is managed by the Biotechnology Cell Science Program at NASA's Johnson Space Center (JSC). NASA-sponsored bioreactor research has been instrumental in helping scientists to better understand normal and cancerous tissue development. In cooperation with the medical community, the bioreactor design is being used to prepare better models of human colon, prostate, breast and ovarian tumors. Cartilage, bone marrow, heart muscle, skeletal muscle, pancreatic islet cells, liver and kidney are just a few of the normal tissues being cultured in rotating bioreactors by investigators.

  6. Sleep deprivation and false memories.

    PubMed

    Frenda, Steven J; Patihis, Lawrence; Loftus, Elizabeth F; Lewis, Holly C; Fenn, Kimberly M

    2014-09-01

    Many studies have investigated factors that affect susceptibility to false memories. However, few have investigated the role of sleep deprivation in the formation of false memories, despite overwhelming evidence that sleep deprivation impairs cognitive function. We examined the relationship between self-reported sleep duration and false memories and the effect of 24 hr of total sleep deprivation on susceptibility to false memories. We found that under certain conditions, sleep deprivation can increase the risk of developing false memories. Specifically, sleep deprivation increased false memories in a misinformation task when participants were sleep deprived during event encoding, but did not have a significant effect when the deprivation occurred after event encoding. These experiments are the first to investigate the effect of sleep deprivation on susceptibility to false memories, which can have dire consequences.

  7. 14 CFR § 1221.109 - Use of the NASA Seal.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false Use of the NASA Seal. § 1221.109 Section § 1221.109 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia, NASA Logotype, NASA...

  8. 14 CFR 1221.105 - Establishment of NASA Program Identifiers.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Establishment of NASA Program Identifiers. 1221.105 Section 1221.105 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia,...

  9. 14 CFR 1221.105 - Establishment of NASA Program Identifiers.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false Establishment of NASA Program Identifiers. 1221.105 Section 1221.105 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia,...

  10. 14 CFR § 1203.101 - Other applicable NASA regulations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false Other applicable NASA regulations. § 1203... INFORMATION SECURITY PROGRAM Scope § 1203.101 Other applicable NASA regulations. (a) Subpart H of this part... this part, “NASA Information Security Program Committee.” (c) NASA Procedural Requirements (NPR)...

  11. 14 CFR 1206.401 - Location of NASA Information Centers.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false Location of NASA Information Centers. 1206... § 1206.401 Location of NASA Information Centers. (a) NASA will maintain the following Information Centers... which copies of Agency forms may be obtained: (1) NASA Headquarters (HQ) Information Center,...

  12. 14 CFR 1245.301 - Inventions under NASA contracts.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Inventions under NASA contracts. 1245.301... INTELLECTUAL PROPERTY RIGHTS NASA Foreign Patent Program § 1245.301 Inventions under NASA contracts. (a) Pursuant to § 1245.113, NASA has facilitated the filing of foreign patent applications by contractors...

  13. 48 CFR 1852.219-76 - NASA 8 percent goal.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false NASA 8 percent goal. 1852... 1852.219-76 NASA 8 percent goal. As prescribed in 1819.7003 insert the following clause: NASA 8 Percent... and daily business operations are controlled by one or more women. (b) The NASA Administrator...

  14. 48 CFR 1852.219-76 - NASA 8 percent goal.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false NASA 8 percent goal. 1852... 1852.219-76 NASA 8 percent goal. As prescribed in 1819.7003 insert the following clause: NASA 8 Percent... and daily business operations are controlled by one or more women. (b) The NASA Administrator...

  15. 14 CFR 1245.301 - Inventions under NASA contracts.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Inventions under NASA contracts. 1245.301... INTELLECTUAL PROPERTY RIGHTS NASA Foreign Patent Program § 1245.301 Inventions under NASA contracts. (a) Pursuant to § 1245.113, NASA has facilitated the filing of foreign patent applications by contractors...

  16. 14 CFR 1221.105 - Establishment of NASA Program Identifiers.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Establishment of NASA Program Identifiers. 1221.105 Section 1221.105 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia,...

  17. 14 CFR § 1245.301 - Inventions under NASA contracts.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false Inventions under NASA contracts. § 1245... AND OTHER INTELLECTUAL PROPERTY RIGHTS NASA Foreign Patent Program § 1245.301 Inventions under NASA contracts. (a) Pursuant to § 1245.113, NASA has facilitated the filing of foreign patent applications...

  18. 14 CFR 1206.401 - Location of NASA Information Centers.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Location of NASA Information Centers. 1206... § 1206.401 Location of NASA Information Centers. (a) NASA will maintain the following Information Centers... which copies of Agency forms may be obtained: (1) NASA Headquarters (HQ) Information Center,...

  19. 14 CFR 1245.301 - Inventions under NASA contracts.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false Inventions under NASA contracts. 1245.301... INTELLECTUAL PROPERTY RIGHTS NASA Foreign Patent Program § 1245.301 Inventions under NASA contracts. (a) Pursuant to § 1245.113, NASA has facilitated the filing of foreign patent applications by contractors...

  20. 14 CFR 1206.401 - Location of NASA Information Centers.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Location of NASA Information Centers. 1206... § 1206.401 Location of NASA Information Centers. (a) NASA will maintain the following Information Centers... which copies of Agency forms may be obtained: (1) NASA Headquarters (HQ) Information Center,...

  1. 48 CFR 1852.219-76 - NASA 8 percent goal.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false NASA 8 percent goal. 1852... 1852.219-76 NASA 8 percent goal. As prescribed in 1819.7003 insert the following clause: NASA 8 Percent... and daily business operations are controlled by one or more women. (b) The NASA Administrator...

  2. NASA Astrophysics Technology Needs

    NASA Technical Reports Server (NTRS)

    Stahl, H. Philip

    2012-01-01

    July 2010, NASA Office of Chief Technologist (OCT) initiated an activity to create and maintain a NASA integrated roadmap for 15 key technology areas which recommend an overall technology investment strategy and prioritize NASA?s technology programs to meet NASA?s strategic goals. Science Instruments, Observatories and Sensor Systems(SIOSS) roadmap addresses technology needs to achieve NASA?s highest priority objectives -- not only for the Science Mission Directorate (SMD), but for all of NASA.

  3. The NASA Exoplanet Archive

    NASA Astrophysics Data System (ADS)

    Ramirez, Solange; Akeson, R. L.; Ciardi, D.; Kane, S. R.; Plavchan, P.; von Braun, K.; NASA Exoplanet Archive Team

    2013-01-01

    The NASA Exoplanet Archive is an online service that compiles and correlates astronomical information on extra solar planets and their host stars. The data in the archive include exoplanet parameters (such as orbits, masses, and radii), associated data (such as published radial velocity curves, photometric light curves, images, and spectra), and stellar parameters (such as magnitudes, positions, and temperatures). All the archived data are linked to the original literature reference.The archive provides tools to work with these data, including interactive tables (with plotting capabilities), interactive light curve viewer, periodogram service, transit and ephemeris calculator, and application program interface.The NASA Exoplanet Archive is the U.S. portal to the public CoRoT mission data for both the Exoplanet and Asteroseismology data sets. The NASA Exoplanet Archive also serves data related to Kepler Objects of Interest (Planet Candidates and the Kepler False Positives, KOI) in an integrated and interactive table containing stellar and transit parameters. In support of the Kepler Extended Mission, the NASA Exoplanet Archive will host transit modeling parameters, centroid results, several statistical values, and summary and detailed reports for all transit-like events identified by the Kepler Pipeline. To access this information visit us at: http://exoplanetarchive.ipac.caltech.edu

  4. Reduced False Memory after Sleep

    ERIC Educational Resources Information Center

    Fenn, Kimberly M.; Gallo, David A.; Margoliash, Daniel; Roediger, Henry L., III; Nusbaum, Howard C.

    2009-01-01

    Several studies have shown that sleep contributes to the successful maintenance of previously encoded information. This research has focused exclusively on memory for studied events, as opposed to false memories. Here we report three experiments showing that sleep reduces false memories in the Deese-Roediger-McDermott (DRM) memory illusion. False…

  5. Study modality and false recall.

    PubMed

    Smith, Rebekah E; Engle, Randall W

    2011-01-01

    False memories occur when individuals mistakenly report an event as having taken place when that event did not in fact occur. The DRM (Deese, 1959; Roediger & McDermott, 1995) paradigm provides an effective technique for creating and investigating false memories. In this paradigm participants study a list of words (e.g., SOUR, CANDY,…) that are highly associated to a non-presented critical item (e.g., SWEET). The study phase is followed by a test of memory for the study list words. Researchers typically find very high levels of false recall of the critical non-presented item. However, the likelihood of falsely remembering the non-presented critical items can be reduced by presenting studied associates visually rather than auditorally (e.g., Smith & Hunt, 1998). This is referred to as the modality effect in false memory. The current study investigated the role of resource availability in the expression of this modality effect in false recall. In Experiment 1 false recall was reduced in the visual study presentation condition relative to the auditory condition for participants with higher working memory capacity, but not for participants with lower working memory capacity. In Experiment 2 the effect of study modality on false recall was eliminated by the addition of a divided attention task at encoding. Both studies support the proposal that resource availability plays a role in the expression of the modality effect in the DRM paradigm (Smith, Lozito, & Bayen, 2005).

  6. Natural and False Color Views of Europa

    NASA Technical Reports Server (NTRS)

    1996-01-01

    This image shows two views of the trailing hemisphere of Jupiter's ice-covered satellite, Europa. The left image shows the approximate natural color appearance of Europa. The image on the right is a false-color composite version combining violet, green and infrared images to enhance color differences in the predominantly water-ice crust of Europa. Dark brown areas represent rocky material derived from the interior, implanted by impact, or from a combination of interior and exterior sources. Bright plains in the polar areas (top and bottom) are shown in tones of blue to distinguish possibly coarse-grained ice (dark blue) from fine-grained ice (light blue). Long, dark lines are fractures in the crust, some of which are more than 3,000 kilometers (1,850 miles) long. The bright feature containing a central dark spot in the lower third of the image is a young impact crater some 50 kilometers (31 miles) in diameter. This crater has been provisionally named 'Pwyll' for the Celtic god of the underworld.

    Europa is about 3,160 kilometers (1,950 miles) in diameter, or about the size of Earth's moon. This image was taken on September 7, 1996, at a range of 677,000 kilometers (417,900 miles) by the solid state imaging television camera onboard the Galileo spacecraft during its second orbit around Jupiter. The image was processed by Deutsche Forschungsanstalt fuer Luftund Raumfahrt e.V., Berlin, Germany.

    The Jet Propulsion Laboratory, Pasadena, CA, manages the mission for NASA's Office of Space Science, Washington, DC.

    This image and other images and data received from Galileo are posted on the Galileo mission home page on the World Wide Web at http://galileo.jpl.nasa.gov. Background information and educational context for the images can be found at http://www.jpl.nasa.gov/galileo/sepo

  7. Two Holes in 'Wooly Patch' (False Color)

    NASA Technical Reports Server (NTRS)

    2004-01-01

    The rock abrasion tool on NASA's Mars Exploration Rover Spirit ground two holes in a relatively soft rock called 'Wooly Patch' near the base of the 'Columbia Hills' inside Gusev Crater on Mars. This false-color image from the panoramic camera was taken on sol 200 (July 25, 2004) and generated using the camera's 750-, 530-, and 430-nanometer filters. It highlights the material ground up by the rock abrasion tool, grayish-blue in appearance in this image. The color of the material excavated suggests the interior of the rock contains iron minerals that are less oxidized than the dust or possibly weathered coating on the exterior of the rock. Scientists speculate that this relatively soft rock (compared to others analyzed by Spirit) may have been modified by water. Small cracks in the surface outside the drill holes may be the result of interactions with water-rich fluids.

  8. Opportunity View of 'Gilbert' Layer (False Color)

    NASA Technical Reports Server (NTRS)

    2008-01-01

    This view from NASA's Mars Exploration Rover Opportunity shows bedock within a stratigraphic layer informally named 'Gilbert,' which is the rover's next target after completing an examination of three stratigtaphic layers forming a bright band around the inside of Victoria Crater. The rover will descend deeper into the crater to reach the Gilbert layer.

    Opportunity used its panoramic camera (Pancam) to capture this image with low-sun angle at a local solar time of 3:30 p.m. during the rover's 1,429th Martian day, of sol (Jan. 31, 2008).

    This view combines separate images taken through the Pancam filters centered on wavelengths of 753 nanometers, 535 nanometers and 432 nanometers. It is presented in a false-color stretch to bring out subtle color differences in the scene.

  9. Opportunity View of 'Lyell' Layer (False Color)

    NASA Technical Reports Server (NTRS)

    2008-01-01

    This view from NASA's Mars Exploration Rover Opportunity shows bedrock within a stratigraphic layer informally named 'Lyell,' which is the lowermost of three layers the rover has examined at a bright band around the inside of Victoria Crater.

    Opportunity used its panoramic camera (Pancam) to capture this image with low-sun angle at a local solar time of 3:21 p.m. during the rover's 1,433rd Martian day, of sol (Feb. 4, 2008).

    This view combines separate images taken through the Pancam filters centered on wavelengths of 753 nanometers, 535 nanometers and 432 nanometers. It is presented in a false-color stretch to bring out subtle color differences in the scene.

  10. View from Spirit's Overwintering Position (False Color)

    NASA Technical Reports Server (NTRS)

    2008-01-01

    NASA's Mars Exploration Rover Spirit has this view northward from the position at the north edge of the 'Home Plate' plateau where the rover will spend its third Martian winter.

    Husband Hill is on the horizon. The dark area in the middle distance is 'El Dorado' sand dune field.

    Spirit used its panoramic camera (Pancam) to capture this image during the rover's 1,448th Martian day, of sol (Jan. 29, 2008).

    This view combines separate images taken through the Pancam filters centered on wavelengths of 753 nanometers, 535 nanometers and 432 nanometers. It is presented in a false-color stretch to bring out subtle color differences in the scene.

  11. Spirit Scans Winter Haven (False Color)

    NASA Technical Reports Server (NTRS)

    2006-01-01

    At least three different kinds of rocks await scientific analysis at the place where NASA's Mars Exploration Rover Spirit will likely spend several months of Martian winter. They are visible in this picture, which the panoramic camera on Spirit acquired during the rover's 809th sol, or Martian day, of exploring Mars (April 12, 2006). Paper-thin layers of light-toned, jagged-edged rocks protrude horizontally from beneath small sand drifts; a light gray rock with smooth, rounded edges sits atop the sand drifts; and several dark gray to black, angular rocks with vesicles (small holes) typical of hardened lava lie scattered across the sand.

    This view is a false-color rendering that combines images taken through the panoramic camera's 753-nanometer, 535-nanometer, and 432-nanometer filters.

  12. Tunneling decay of false kinks

    NASA Astrophysics Data System (ADS)

    Dupuis, Éric; Gobeil, Yan; MacKenzie, Richard; Marleau, Luc; Paranjape, M. B.; Ung, Yvan

    2015-07-01

    We consider the decay of "false kinks," that is, kinks formed in a scalar field theory with a pair of degenerate symmetry-breaking false vacua in 1 +1 dimensions. The true vacuum is symmetric. A second scalar field and a peculiar potential are added in order for the kink to be classically stable. We find an expression for the decay rate of a false kink. As with any tunneling event, the rate is proportional to exp (-SE) where SE is the Euclidean action of the bounce describing the tunneling event. This factor varies wildly depending on the parameters of the model. Of interest is the fact that for certain parameters SE can get arbitrarily small, implying that the kink is only barely stable. Thus, while the false vacuum itself may be very long-lived, the presence of kinks can give rise to rapid vacuum decay.

  13. False allegation of child abduction.

    PubMed

    Canning, Kathleen E; Hilts, Mark A; Muirhead, Yvonne E

    2011-05-01

    Cases in which a child has been falsely reported as missing or abducted can be extremely challenging to the law enforcement agencies responsible for their investigation. In the absence of a witnessed abduction or an obvious crime scene, it is difficult to determine whether a child has actually been abducted or has become a victim of a homicide and a false allegation. The purpose of this study was to examine falsely alleged kidnapping cases and identify successful investigative strategies. Sixty-one adjudicated false allegation cases involving 66 victims were analyzed. The mean age of the victim was 5 years. Victims came from generally unstable, high-risk family situations and were killed primarily by biological parents. Victims were killed because they were unwanted or viewed as an obstacle to a desired goal, or they were victims of abuse or maltreatment that ended in fatality.

  14. NASA Bioreactor

    NASA Technical Reports Server (NTRS)

    1998-01-01

    Bioreactor Demonstration System (BDS) comprises an electronics module, a gas supply module, and the incubator module housing the rotating wall vessel and its support systems. Nutrient media are pumped through an oxygenator and the culture vessel. The shell rotates at 0.5 rpm while the irner filter typically rotates at 11.5 rpm to produce a gentle flow that ensures removal of waste products as fresh media are infused. Periodically, some spent media are pumped into a waste bag and replaced by fresh media. When the waste bag is filled, an astronaut drains the waste bag and refills the supply bag through ports on the face of the incubator. Pinch valves and a perfusion pump ensure that no media are exposed to moving parts. An Experiment Control Computer controls the Bioreactor, records conditions, and alerts the crew when problems occur. The crew operates the system through a laptop computer displaying graphics designed for easy crew training and operation. The work is sponsored by NASA's Office of Biological and Physical Research. The bioreactor is managed by the Biotechnology Cell Science Program at NASA's Johnson Space Center (JSC). NASA-sponsored bioreactor research has been instrumental in helping scientists to better understand normal and cancerous tissue development. In cooperation with the medical community, the bioreactor design is being used to prepare better models of human colon, prostate, breast and ovarian tumors. Cartilage, bone marrow, heart muscle, skeletal muscle, pancreatic islet cells, liver and kidney are just a few of the normal tissues being cultured in rotating bioreactors by investigators. See No. 0101824 for a version with labels, and No. 0103180 for an operational schematic.

  15. NASA Bioreactor

    NASA Technical Reports Server (NTRS)

    1998-01-01

    Biotechnology Specimen Temperature Controller (BSTC) will cultivate cells until their turn in the bioreactor; it can also be used in culturing experiments that do not require the bioreactor. The BSTC comprises four incubation/refrigeration chambers individually set at 4 to 50 degreesC (near-freezing to above body temperature). Each chamber holds three rugged tissue chamber modules (12 total), clear Teflon bags holding 30 ml of growth media, all positioned by a metal frame. Every 7 to 21 days (depending on growth rates), an astronaut uses a shrouded syringe and the bags' needleless injection ports to transfer a few cells to a fresh media bag, and to introduce a fixative so that the cells may be studied after flight. The design also lets the crew sample the media to measure glucose, gas, and pH levels, and to inspect cells with a microscope. The controller is monitored by the flight crew through a 23-cm (9-inch) color computer display on the face of the BSTC. This view shows the BTSC with the front panel open. The work is sponsored by NASA's Office of Biological and Physical Research. The bioreactor is managed by the Biotechnology Cell Science Program at NASA's Johnson Space Center (JSC). NASA-sponsored bioreactor research has been instrumental in helping scientists to better understand normal and cancerous tissue development. In cooperation with the medical community, the bioreactor design is being used to prepare better models of human colon, prostate, breast and ovarian tumors. Cartilage, bone marrow, heart muscle, skeletal muscle, pancreatic islet cells, liver and kidney are just a few of the normal tissues being cultured in rotating bioreactors by investigators.

  16. NASA Bioreactor

    NASA Technical Reports Server (NTRS)

    1998-01-01

    Bioreactor Demonstration System (BDS) comprises an electronics module, a gas supply module, and the incubator module housing the rotating wall vessel and its support systems. Nutrient media are pumped through an oxygenator and the culture vessel. The shell rotates at 0.5 rpm while the irner filter typically rotates at 11.5 rpm to produce a gentle flow that ensures removal of waste products as fresh media are infused. Periodically, some spent media are pumped into a waste bag and replaced by fresh media. When the waste bag is filled, an astronaut drains the waste bag and refills the supply bag through ports on the face of the incubator. Pinch valves and a perfusion pump ensure that no media are exposed to moving parts. An Experiment Control Computer controls the Bioreactor, records conditions, and alerts the crew when problems occur. The crew operates the system through a laptop computer displaying graphics designed for easy crew training and operation. The work is sponsored by NASA's Office of Biological and Physical Research. The bioreactor is managed by the Biotechnology Cell Science Program at NASA's Johnson Space Center (JSC). NASA-sponsored bioreactor research has been instrumental in helping scientists to better understand normal and cancerous tissue development. In cooperation with the medical community, the bioreactor design is being used to prepare better models of human colon, prostate, breast and ovarian tumors. Cartilage, bone marrow, heart muscle, skeletal muscle, pancreatic islet cells, liver and kidney are just a few of the normal tissues being cultured in rotating bioreactors by investigators. See No. 0101823 for a version without labels, and No. 0103180 for an operational schematic.

  17. NASA Bioreactor

    NASA Technical Reports Server (NTRS)

    1998-01-01

    Biotechnology Specimen Temperature Controller (BSTC) will cultivate cells until their turn in the bioreactor; it can also be used in culturing experiments that do not require the bioreactor. The BSTC comprises four incubation/refrigeration chambers individually set at 4 to 50 deg. C (near-freezing to above body temperature). Each chamber holds three rugged tissue chamber modules (12 total), clear Teflon bags holding 30 ml of growth media, all positioned by a metal frame. Every 7 to 21 days (depending on growth rates), an astronaut uses a shrouded syringe and the bags' needleless injection ports to transfer a few cells to a fresh media bag, and to introduce a fixative so that the cells may be studied after flight. The design also lets the crew sample the media to measure glucose, gas, and pH levels, and to inspect cells with a microscope. The controller is monitored by the flight crew through a 23-cm (9-inch) color computer display on the face of the BSTC. This view shows the BTSC with the front panel open. The work is sponsored by NASA's Office of Biological and Physical Research. The bioreactor is managed by the Biotechnology Cell Science Program at NASA's Johnson Space Center (JSC). NASA-sponsored bioreactor research has been instrumental in helping scientists to better understand normal and cancerous tissue development. In cooperation with the medical community, the bioreactor design is being used to prepare better models of human colon, prostate, breast and ovarian tumors. Cartilage, bone marrow, heart muscle, skeletal muscle, pancreatic islet cells, liver and kidney are just a few of the normal tissues being cultured in rotating bioreactors by investigators.

  18. NASA Bioreactor

    NASA Technical Reports Server (NTRS)

    1998-01-01

    Bioreactor Demonstration System (BDS) comprises an electronics module, a gas supply module, and the incubator module housing the rotating wall vessel and its support systems. Nutrient media are pumped through an oxygenator and the culture vessel. The shell rotates at 0.5 rpm while the irner filter typically rotates at 11.5 rpm to produce a gentle flow that ensures removal of waste products as fresh media are infused. Periodically, some spent media are pumped into a waste bag and replaced by fresh media. When the waste bag is filled, an astronaut drains the waste bag and refills the supply bag through ports on the face of the incubator. Pinch valves and a perfusion pump ensure that no media are exposed to moving parts. An Experiment Control Computer controls the Bioreactor, records conditions, and alerts the crew when problems occur. The crew operates the system through a laptop computer displaying graphics designed for easy crew training and operation. The work is sponsored by NASA's Office of Biological and Physical Research. The bioreactor is managed by the Biotechnology Cell Science Program at NASA's Johnson Space Center (JSC). NASA-sponsored bioreactor research has been instrumental in helping scientists to better understand normal and cancerous tissue development. In cooperation with the medical community, the bioreactor design is being used to prepare better models of human colon, prostate, breast and ovarian tumors. Cartilage, bone marrow, heart muscle, skeletal muscle, pancreatic islet cells, liver and kidney are just a few of the normal tissues being cultured in rotating bioreactors by investigators. See No. 0101816 for a version without labels, and No. 0103180 for an operational schematic.

  19. NASA Bioreactor

    NASA Technical Reports Server (NTRS)

    1998-01-01

    Bioreactor Demonstration System (BDS) comprises an electronics module, a gas supply module, and the incubator module housing the rotating wall vessel and its support systems. Nutrient media are pumped through an oxygenator and the culture vessel. The shell rotates at 0.5 rpm while the irner filter typically rotates at 11.5 rpm to produce a gentle flow that ensures removal of waste products as fresh media are infused. Periodically, some spent media are pumped into a waste bag and replaced by fresh media. When the waste bag is filled, an astronaut drains the waste bag and refills the supply bag through ports on the face of the incubator. Pinch valves and a perfusion pump ensure that no media are exposed to moving parts. An Experiment Control Computer controls the Bioreactor, records conditions, and alerts the crew when problems occur. The crew operates the system through a laptop computer displaying graphics designed for easy crew training and operation. The work is sponsored by NASA's Office of Biological and Physical Research. The bioreactor is managed by the Biotechnology Cell Science Program at NASA's Johnson Space Center (JSC). NASA-sponsored bioreactor research has been instrumental in helping scientists to better understand normal and cancerous tissue development. In cooperation with the medical community, the bioreactor design is being used to prepare better models of human colon, prostate, breast and ovarian tumors. Cartilage, bone marrow, heart muscle, skeletal muscle, pancreatic islet cells, liver and kidney are just a few of the normal tissues being cultured in rotating bioreactors by investigators. See No. 0101825 for a version with major elements labeled, and No. 0103180 for an operational schematic. 0101816

  20. Bubbling the false vacuum away

    SciTech Connect

    Gleiser, M.; Rogers, B.; Thorarinson, J.

    2008-01-15

    We investigate the role of nonperturbative, bubblelike inhomogeneities on the decay rate of false-vacuum states in two- and three-dimensional scalar field theories. The inhomogeneities are induced by setting up large-amplitude oscillations of the field about the false vacuum, as, for example, after a rapid quench or in certain models of cosmological inflation. We show that, for a wide range of parameters, the presence of large-amplitude bubblelike inhomogeneities greatly accelerates the decay rate, changing it from the well-known exponential suppression of homogeneous nucleation to a power-law suppression. It is argued that this fast, power-law vacuum decay--known as resonant nucleation--is promoted by the presence of long-lived oscillons among the nonperturbative fluctuations about the false vacuum. A phase diagram is obtained distinguishing three possible mechanisms for vacuum decay: homogeneous nucleation, resonant nucleation, and crossover. Possible applications are briefly discussed.

  1. Tunneling decay of false vortices

    NASA Astrophysics Data System (ADS)

    Lee, Bum-Hoon; Lee, Wonwoo; MacKenzie, Richard; Paranjape, M. B.; Yajnik, U. A.; Yeom, Dong-han

    2013-10-01

    We consider the decay of vortices trapped in the false vacuum of a theory of scalar electrodynamics in 2+1 dimensions. The potential is inspired by models with intermediate symmetry breaking to a metastable vacuum that completely breaks a U(1) symmetry, while in the true vacuum, the symmetry is unbroken. The false vacuum is unstable through the formation of true vacuum bubbles; however, the rate of decay can be extremely long. On the other hand, the false vacuum can contain metastable vortex solutions. These vortices contain the true vacuum inside in addition to a unit of magnetic flux and the appropriate topologically nontrivial false vacuum outside. We numerically establish the existence of vortex solutions which are classically stable; however, they can decay via tunneling. In general terms, they tunnel to a configuration which is a large, thin-walled vortex configuration that is now classically unstable to the expansion of its radius. We compute an estimate for the tunneling amplitude in the semiclassical approximation. We believe our analysis would be relevant to superconducting thin films or superfluids.

  2. Sleep Loss Produces False Memories

    PubMed Central

    Diekelmann, Susanne; Landolt, Hans-Peter; Lahl, Olaf; Born, Jan; Wagner, Ullrich

    2008-01-01

    People sometimes claim with high confidence to remember events that in fact never happened, typically due to strong semantic associations with actually encoded events. Sleep is known to provide optimal neurobiological conditions for consolidation of memories for long-term storage, whereas sleep deprivation acutely impairs retrieval of stored memories. Here, focusing on the role of sleep-related memory processes, we tested whether false memories can be created (a) as enduring memory representations due to a consolidation-associated reorganization of new memory representations during post-learning sleep and/or (b) as an acute retrieval-related phenomenon induced by sleep deprivation at memory testing. According to the Deese, Roediger, McDermott (DRM) false memory paradigm, subjects learned lists of semantically associated words (e.g., “night”, “dark”, “coal”,…), lacking the strongest common associate or theme word (here: “black”). Subjects either slept or stayed awake immediately after learning, and they were either sleep deprived or not at recognition testing 9, 33, or 44 hours after learning. Sleep deprivation at retrieval, but not sleep following learning, critically enhanced false memories of theme words. This effect was abolished by caffeine administration prior to retrieval, indicating that adenosinergic mechanisms can contribute to the generation of false memories associated with sleep loss. PMID:18946511

  3. The Danger of False Dichotomies.

    ERIC Educational Resources Information Center

    LaBoskey, Vicky Kubler

    1998-01-01

    Responds to an article that examined 10 dichotomies in teacher education (SP 527 128), suggesting that too much time and energy are spent debating false dichotomies and addressing two specific dichotomies (preservice versus inservice and campus versus school site). Recommends that professional educators pool their energy and collaborate (rather…

  4. Evolutionary Psychology and False Confession

    ERIC Educational Resources Information Center

    Bering, Jesse M.; Shackelford, Todd K.

    2005-01-01

    This paper presents comments on Kassin's review, (see record 2005-03019-002) of the psychology of false confessions. The authors note that Kassin's review makes a compelling argument for the need for legal reform in police interrogation practices. Because his work strikes at the heart of the American criminal justice system--its fairness--the…

  5. Sleep deprivation and false confessions

    PubMed Central

    Frenda, Steven J.; Berkowitz, Shari R.; Loftus, Elizabeth F.; Fenn, Kimberly M.

    2016-01-01

    False confession is a major contributor to the problem of wrongful convictions in the United States. Here, we provide direct evidence linking sleep deprivation and false confessions. In a procedure adapted from Kassin and Kiechel [(1996) Psychol Sci 7(3):125–128], participants completed computer tasks across multiple sessions and repeatedly received warnings that pressing the “Escape” key on their keyboard would cause the loss of study data. In their final session, participants either slept all night in laboratory bedrooms or remained awake all night. In the morning, all participants were asked to sign a statement, which summarized their activities in the laboratory and falsely alleged that they pressed the Escape key during an earlier session. After a single request, the odds of signing were 4.5 times higher for the sleep-deprived participants than for the rested participants. These findings have important implications and highlight the need for further research on factors affecting true and false confessions. PMID:26858426

  6. Sleep loss produces false memories.

    PubMed

    Diekelmann, Susanne; Landolt, Hans-Peter; Lahl, Olaf; Born, Jan; Wagner, Ullrich

    2008-01-01

    People sometimes claim with high confidence to remember events that in fact never happened, typically due to strong semantic associations with actually encoded events. Sleep is known to provide optimal neurobiological conditions for consolidation of memories for long-term storage, whereas sleep deprivation acutely impairs retrieval of stored memories. Here, focusing on the role of sleep-related memory processes, we tested whether false memories can be created (a) as enduring memory representations due to a consolidation-associated reorganization of new memory representations during post-learning sleep and/or (b) as an acute retrieval-related phenomenon induced by sleep deprivation at memory testing. According to the Deese, Roediger, McDermott (DRM) false memory paradigm, subjects learned lists of semantically associated words (e.g., "night", "dark", "coal",...), lacking the strongest common associate or theme word (here: "black"). Subjects either slept or stayed awake immediately after learning, and they were either sleep deprived or not at recognition testing 9, 33, or 44 hours after learning. Sleep deprivation at retrieval, but not sleep following learning, critically enhanced false memories of theme words. This effect was abolished by caffeine administration prior to retrieval, indicating that adenosinergic mechanisms can contribute to the generation of false memories associated with sleep loss.

  7. 48 CFR 1842.271 - NASA clause.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false NASA clause. 1842.271 Section 1842.271 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION... NASA clause. Insert the clause at 1852.242-70, Technical Direction, when paragraph 3(m) of the...

  8. 48 CFR 1842.271 - NASA clause.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false NASA clause. 1842.271 Section 1842.271 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION... NASA clause. Insert the clause at 1852.242-70, Technical Direction, when paragraph 3(m) of the...

  9. 48 CFR 1842.271 - NASA clause.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false NASA clause. 1842.271 Section 1842.271 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION... NASA clause. Insert the clause at 1852.242-70, Technical Direction, when paragraph 3(m) of the...

  10. MSPI False Indication Probability Simulations

    SciTech Connect

    Dana Kelly; Kurt Vedros; Robert Youngblood

    2011-03-01

    This paper examines false indication probabilities in the context of the Mitigating System Performance Index (MSPI), in order to investigate the pros and cons of different approaches to resolving two coupled issues: (1) sensitivity to the prior distribution used in calculating the Bayesian-corrected unreliability contribution to the MSPI, and (2) whether (in a particular plant configuration) to model the fuel oil transfer pump (FOTP) as a separate component, or integrally to its emergency diesel generator (EDG). False indication probabilities were calculated for the following situations: (1) all component reliability parameters at their baseline values, so that the true indication is green, meaning that an indication of white or above would be false positive; (2) one or more components degraded to the extent that the true indication would be (mid) white, and “false” would be green (negative) or yellow (negative) or red (negative). In key respects, this was the approach taken in NUREG-1753. The prior distributions examined were the constrained noninformative (CNI) prior used currently by the MSPI, a mixture of conjugate priors, the Jeffreys noninformative prior, a nonconjugate log(istic)-normal prior, and the minimally informative prior investigated in (Kelly et al., 2010). The mid-white performance state was set at ?CDF = ?10 ? 10-6/yr. For each simulated time history, a check is made of whether the calculated ?CDF is above or below 10-6/yr. If the parameters were at their baseline values, and ?CDF > 10-6/yr, this is counted as a false positive. Conversely, if one or all of the parameters are set to values corresponding to ?CDF > 10-6/yr but that time history’s ?CDF < 10-6/yr, this is counted as a false negative indication. The false indication (positive or negative) probability is then estimated as the number of false positive or negative counts divided by the number of time histories (100,000). Results are presented for a set of base case parameter values

  11. Uranus in True and False Color

    NASA Technical Reports Server (NTRS)

    1986-01-01

    These two pictures of Uranus -- one in true color (left) and the other in false color -- were compiled from images returned Jan. 17, 1986, by the narrow-angle camera of Voyager 2. The spacecraft was 9.1 million kilometers (5.7 million miles) from the planet, several days from closest approach. The picture at left has been processed to show Uranus as human eyes would see it from the vantage point of the spacecraft. The picture is a composite of images taken through blue, green and orange filters. The darker shadings at the upper right of the disk correspond to the day-night boundary on the planet. Beyond this boundary lies the hidden northern hemisphere of Uranus, which currently remains in total darkness as the planet rotates. The blue-green color results from the absorption of red light by methane gas in Uranus' deep, cold and remarkably clear atmosphere. The picture at right uses false color and extreme contrast enhancement to bring out subtle details in the polar region of Uranus. Images obtained through ultraviolet, violet and orange filters were respectively converted to the same blue, green and red colors used to produce the picture at left. The very slight contrasts visible in true color are greatly exaggerated here. In this false-color picture, Uranus reveals a dark polar hood surrounded by a series of progressively lighter concentric bands. One possible explanation is that a brownish haze or smog, concentrated over the pole, is arranged into bands by zonal motions of the upper atmosphere. The bright orange and yellow strip at the lower edge of the planet's limb is an artifact of the image enhancement. In fact, the limb is dark and uniform in color around the planet. The Voyager project is manages for NASA by the Jet Propulsion Laboratory.

  12. Blue Polar Dunes In False Color

    NASA Technical Reports Server (NTRS)

    2005-01-01

    [figure removed for brevity, see original site]

    The theme for the weeks of 1/17 and 1/24 is the north polar region of Mars as seen in false color THEMIS images. Ice/frost will typically appear as bright blue in color; dust mantled ice will appear in tones of red/orange.

    The small dunes in this image are 'bluer' than the rest of the layered ice/dust units to the left.

    Image information: VIS instrument. Latitude 84.5, Longitude 206.6 East (153.4 West). 19 meter/pixel resolution.

    Note: this THEMIS visual image has not been radiometrically nor geometrically calibrated for this preliminary release. An empirical correction has been performed to remove instrumental effects. A linear shift has been applied in the cross-track and down-track direction to approximate spacecraft and planetary motion. Fully calibrated and geometrically projected images will be released through the Planetary Data System in accordance with Project policies at a later time.

    NASA's Jet Propulsion Laboratory manages the 2001 Mars Odyssey mission for NASA's Office of Space Science, Washington, D.C. The Thermal Emission Imaging System (THEMIS) was developed by Arizona State University, Tempe, in collaboration with Raytheon Santa Barbara Remote Sensing. The THEMIS investigation is led by Dr. Philip Christensen at Arizona State University. Lockheed Martin Astronautics, Denver, is the prime contractor for the Odyssey project, and developed and built the orbiter. Mission operations are conducted jointly from Lockheed Martin and from JPL, a division of the California Institute of Technology in Pasadena.

  13. Dunes and Clouds in False Color

    NASA Technical Reports Server (NTRS)

    2005-01-01

    [figure removed for brevity, see original site]

    The theme for the weeks of 1/17 and 1/24 is the north polar region of Mars as seen in false color THEMIS images. Ice/frost will typically appear as bright blue in color; dust mantled ice will appear in tones of red/orange.

    The small greenish features in this image are sand dunes. The white feature on the right side is likely an ice cloud.

    Image information: VIS instrument. Latitude 84.6, Longitude 203.1 East (156.9 West). 19 meter/pixel resolution.

    Note: this THEMIS visual image has not been radiometrically nor geometrically calibrated for this preliminary release. An empirical correction has been performed to remove instrumental effects. A linear shift has been applied in the cross-track and down-track direction to approximate spacecraft and planetary motion. Fully calibrated and geometrically projected images will be released through the Planetary Data System in accordance with Project policies at a later time.

    NASA's Jet Propulsion Laboratory manages the 2001 Mars Odyssey mission for NASA's Office of Space Science, Washington, D.C. The Thermal Emission Imaging System (THEMIS) was developed by Arizona State University, Tempe, in collaboration with Raytheon Santa Barbara Remote Sensing. The THEMIS investigation is led by Dr. Philip Christensen at Arizona State University. Lockheed Martin Astronautics, Denver, is the prime contractor for the Odyssey project, and developed and built the orbiter. Mission operations are conducted jointly from Lockheed Martin and from JPL, a division of the California Institute of Technology in Pasadena.

  14. A Frosty Rim In False Color

    NASA Technical Reports Server (NTRS)

    2005-01-01

    [figure removed for brevity, see original site]

    The theme for the weeks of 1/17 and 1/24 is the north polar region of Mars as seen in false color THEMIS images. Ice/frost will typically appear as bright blue in color; dust mantled ice will appear in tones of red/orange.

    Our final image combines the features of the past two days, with a dust covered frosty crater rim and the bluer sand dunes of the north polar region.

    Image information: VIS instrument. Latitude 70.1, Longitude 351.8 East (8.2 West). 40 meter/pixel resolution.

    Note: this THEMIS visual image has not been radiometrically nor geometrically calibrated for this preliminary release. An empirical correction has been performed to remove instrumental effects. A linear shift has been applied in the cross-track and down-track direction to approximate spacecraft and planetary motion. Fully calibrated and geometrically projected images will be released through the Planetary Data System in accordance with Project policies at a later time.

    NASA's Jet Propulsion Laboratory manages the 2001 Mars Odyssey mission for NASA's Office of Space Science, Washington, D.C. The Thermal Emission Imaging System (THEMIS) was developed by Arizona State University, Tempe, in collaboration with Raytheon Santa Barbara Remote Sensing. The THEMIS investigation is led by Dr. Philip Christensen at Arizona State University. Lockheed Martin Astronautics, Denver, is the prime contractor for the Odyssey project, and developed and built the orbiter. Mission operations are conducted jointly from Lockheed Martin and from JPL, a division of the California Institute of Technology in Pasadena.

  15. Outcome Knowledge and False Belief

    PubMed Central

    Ghrear, Siba E.; Birch, Susan A. J.; Bernstein, Daniel M.

    2016-01-01

    Virtually every social interaction involves reasoning about the perspectives of others, or ‘theory of mind (ToM).’ Previous research suggests that it is difficult to ignore our current knowledge when reasoning about a more naïve perspective (i.e., the curse of knowledge). In this Mini Review, we discuss the implications of the curse of knowledge for certain aspects of ToM. Particularly, we examine how the curse of knowledge influences key measurements of false belief reasoning. In closing, we touch on the need to develop new measurement tools to discern the mechanisms involved in the curse of knowledge and false belief reasoning, and how they develop across the lifespan. PMID:26903922

  16. 14 CFR 1221.108 - Establishment of the NASA Unified Visual Communications System.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Establishment of the NASA Unified Visual... Insignia, NASA Logotype, NASA Program Identifiers, NASA Flags, and the Agency's Unified Visual Communications System § 1221.108 Establishment of the NASA Unified Visual Communications System. (a) The...

  17. 14 CFR 1221.112 - Use of the NASA Program Identifiers.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Use of the NASA Program Identifiers. 1221.112 Section 1221.112 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia, NASA...

  18. 14 CFR § 1221.113 - Use of the NASA Flags.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false Use of the NASA Flags. § 1221.113 Section § 1221.113 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia, NASA Logotype,...

  19. 14 CFR § 1221.111 - Use of the NASA Logotype.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false Use of the NASA Logotype. § 1221.111 Section § 1221.111 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia, NASA Logotype,...

  20. 14 CFR 1221.112 - Use of the NASA Program Identifiers.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false Use of the NASA Program Identifiers. 1221.112 Section 1221.112 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia, NASA...

  1. 14 CFR § 1221.106 - Establishment of the NASA Flag.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false Establishment of the NASA Flag. § 1221.106 Section § 1221.106 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia, NASA Logotype,...

  2. 14 CFR 1221.112 - Use of the NASA Program Identifiers.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Use of the NASA Program Identifiers. 1221.112 Section 1221.112 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia, NASA...

  3. 14 CFR § 1221.102 - Establishment of the NASA Seal.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false Establishment of the NASA Seal. § 1221.102 Section § 1221.102 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia, NASA Logotype,...

  4. 14 CFR § 1221.110 - Use of the NASA Insignia.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false Use of the NASA Insignia. § 1221.110 Section § 1221.110 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia, NASA Logotype,...

  5. Does sleep promote false memories?

    PubMed

    Darsaud, Annabelle; Dehon, Hedwige; Lahl, Olaf; Sterpenich, Virginie; Boly, Mélanie; Dang-Vu, Thanh; Desseilles, Martin; Gais, Stephen; Matarazzo, Luca; Peters, Frédéric; Schabus, Manuel; Schmidt, Christina; Tinguely, Gilberte; Vandewalle, Gilles; Luxen, André; Maquet, Pierre; Collette, Fabienne

    2011-01-01

    Memory is constructive in nature so that it may sometimes lead to the retrieval of distorted or illusory information. Sleep facilitates accurate declarative memory consolidation but might also promote such memory distortions. We examined the influence of sleep and lack of sleep on the cerebral correlates of accurate and false recollections using fMRI. After encoding lists of semantically related word associates, half of the participants were allowed to sleep, whereas the others were totally sleep deprived on the first postencoding night. During a subsequent retest fMRI session taking place 3 days later, participants made recognition memory judgments about the previously studied associates, critical theme words (which had not been previously presented during encoding), and new words unrelated to the studied items. Sleep, relative to sleep deprivation, enhanced accurate and false recollections. No significant difference was observed in brain responses to false or illusory recollection between sleep and sleep deprivation conditions. However, after sleep but not after sleep deprivation (exclusive masking), accurate and illusory recollections were both associated with responses in the hippocampus and retrosplenial cortex. The data suggest that sleep does not selectively enhance illusory memories but rather tends to promote systems-level consolidation in hippocampo-neocortical circuits of memories subsequently associated with both accurate and illusory recollections. We further observed that during encoding, hippocampal responses were selectively larger for items subsequently accurately retrieved than for material leading to illusory memories. The data indicate that the early organization of memory during encoding is a major factor influencing subsequent production of accurate or false memories.

  6. False Color Mosaic Great Red Spot

    NASA Technical Reports Server (NTRS)

    1996-01-01

    False color representation of Jupiter's Great Red Spot (GRS) taken through three different near-infrared filters of the Galileo imaging system and processed to reveal cloud top height. Images taken through Galileo's near-infrared filters record sunlight beyond the visible range that penetrates to different depths in Jupiter's atmosphere before being reflected by clouds. The Great Red Spot appears pink and the surrounding region blue because of the particular color coding used in this representation. Light reflected by Jupiter at a wavelength (886 nm) where methane strongly absorbs is shown in red. Due to this absorption, only high clouds can reflect sunlight in this wavelength. Reflected light at a wavelength (732 nm) where methane absorbs less strongly is shown in green. Lower clouds can reflect sunlight in this wavelength. Reflected light at a wavelength (757 nm) where there are essentially no absorbers in the Jovian atmosphere is shown in blue: This light is reflected from the deepest clouds. Thus, the color of a cloud in this image indicates its height. Blue or black areas are deep clouds; pink areas are high, thin hazes; white areas are high, thick clouds. This image shows the Great Red Spot to be relatively high, as are some smaller clouds to the northeast and northwest that are surprisingly like towering thunderstorms found on Earth. The deepest clouds are in the collar surrounding the Great Red Spot, and also just to the northwest of the high (bright) cloud in the northwest corner of the image. Preliminary modeling shows these cloud heights vary over 30 km in altitude. This mosaic, of eighteen images (6 in each filter) taken over a 6 minute interval during the second GRS observing sequence on June 26, 1996, has been map-projected to a uniform grid of latitude and longitude. North is at the top.

    Launched in October 1989, Galileo entered orbit around Jupiter on December 7, 1995. The spacecraft's mission is to conduct detailed studies of the giant planet

  7. False-color Dalmatian Terrain

    NASA Technical Reports Server (NTRS)

    2004-01-01

    [figure removed for brevity, see original site]

    Released 10 May 2004 This daytime visible color image was collected on May 18, 2003 during the Southern Spring season in Noachis Terra.

    The THEMIS VIS camera is capable of capturing color images of the martian surface using its five different color filters. In this mode of operation, the spatial resolution and coverage of the image must be reduced to accommodate the additional data volume produced from the use of multiple filters. To make a color image, three of the five filter images (each in grayscale) are selected. Each is contrast enhanced and then converted to a red, green, or blue intensity image. These three images are then combined to produce a full color, single image. Because the THEMIS color filters don't span the full range of colors seen by the human eye, a color THEMIS image does not represent true color. Also, because each single-filter image is contrast enhanced before inclusion in the three-color image, the apparent color variation of the scene is exaggerated. Nevertheless, the color variation that does appear is representative of some change in color, however subtle, in the actual scene. Note that the long edges of THEMIS color images typically contain color artifacts that do not represent surface variation.

    Image information: VIS instrument. Latitude -74, Longitude 351.9 East (8.1 West). 38 meter/pixel resolution.

    Note: this THEMIS visual image has not been radiometrically nor geometrically calibrated for this preliminary release. An empirical correction has been performed to remove instrumental effects. A linear shift has been applied in the cross-track and down-track direction to approximate spacecraft and planetary motion. Fully calibrated and geometrically projected images will be released through the Planetary Data System in accordance with Project policies at a later time.

    NASA's Jet Propulsion Laboratory manages the 2001 Mars Odyssey mission for NASA's Office of Space

  8. NASA Mission: The Universe

    NASA Technical Reports Server (NTRS)

    1990-01-01

    This booklet is mainly a recruitment tool for the various NASA Centers. This well illustrated booklet briefly describes NASA's mission and career opportunities on the NASA team. NASA field installations and their missions are briefly noted. NASA's four chief program offices are briefly described. They are: (1) Aeronautics, Exploration, and Space Technology; (2) Space Flight; (3) Space Operations; and (4) Space Science and Applications.

  9. The NASA Astrophysics Program

    NASA Technical Reports Server (NTRS)

    Zebulum, Ricardo S.

    2011-01-01

    NASA's scientists are enjoying unprecedented access to astronomy data from space, both from missions launched and operated only by NASA, as well as missions led by other space agencies to which NASA contributed instruments or technology. This paper describes the NASA astrophysics program for the next decade, including NASA's response to the ASTRO2010 Decadal Survey.

  10. False advertising in the greenhouse?

    NASA Astrophysics Data System (ADS)

    Banse, K.

    1991-12-01

    Most scientists are convinced of the importance of their own research subjects. Broecker [1991] has deplored the temptation, if not the tendency, to go overboard and exaggerate this importance once funding enters the mind. In particular, he alleges inflated or even false claims by biological (and other) oceanographers regarding the relevance of their research to the "greenhouse effect," caused by the anthropogenic enhancement of the atmospheric CO2 content. He writes [Broecker, 1991, p. 191]: "In my estimation, on any list of subjects requiring intense study with regard to the prediction of the consequences of CO2 buildup in the atmosphere, I would place marine biological cycles near the bottom."

  11. Working at NASA

    NASA Technical Reports Server (NTRS)

    Harding, Adam

    2010-01-01

    This slide presentation reviews the author's educational and work background prior to working at NASA. It then presents an overview of NASA Dryden, a brief review of the author's projects while working at NASA, and some closing thoughts.

  12. NASA - Beyond Boundaries

    NASA Technical Reports Server (NTRS)

    McMillan, Courtenay

    2016-01-01

    NASA is able to achieve human spaceflight goals in partnership with international and commercial teams by establishing common goals and building connections. Presentation includes photographs from NASA missions - on orbit, in Mission Control, and at other NASA facilities.

  13. Selling to NASA

    NASA Technical Reports Server (NTRS)

    1990-01-01

    This handbook is designed to promote a better understanding of NASA's interests and the process of doing business with NASA. The document is divided into the following sections: (1) this is NASA; (2) the procurement process; (3) marketing your capabilities; (4) special assistance programs; (5) NASA field installations; (6) sources of additional help; (7) listing of NASA small/minority business personnel; and (8) NASA organization chart.

  14. 48 CFR 1832.412-70 - NASA Contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false NASA Contract clauses....412-70 NASA Contract clauses. When the clause at FAR 52.232-12 or its Alternates II or V are used, insert the clause at 1852.232-70, NASA Modification of FAR 52.232-12....

  15. 14 CFR § 1206.503 - NASA Headquarters.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false NASA Headquarters. § 1206.503 Section Â... RECORDS TO MEMBERS OF THE PUBLIC Responsibilities § 1206.503 NASA Headquarters. (a) Except as otherwise... throughout NASA to facilitate the preparation of such reports; (2) After consultation with the Office...

  16. 48 CFR 1816.506-70 - NASA contract clause.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false NASA contract clause. 1816...-70 NASA contract clause. Insert the clause at 1852.216-80, Task Ordering Procedure, in solicitations... reporting (See NPR 9501.2, NASA Contractor Financial Management Reporting System), use the clause with...

  17. 48 CFR 1850.104-70 - Lead NASA installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Lead NASA installation... Actions 1850.104-70 Lead NASA installation. (a) Contractors applying for indemnification shall determine which NASA installation has the highest dollar amount of contracts for which indemnification...

  18. 48 CFR 1816.506-70 - NASA contract clause.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false NASA contract clause. 1816...-70 NASA contract clause. Insert the clause at 1852.216-80, Task Ordering Procedure, in solicitations... reporting (See NPR 9501.2, NASA Contractor Financial Management Reporting System), use the clause with...

  19. 48 CFR 1816.506-70 - NASA contract clause.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false NASA contract clause. 1816...-70 NASA contract clause. Insert the clause at 1852.216-80, Task Ordering Procedure, in solicitations... reporting (See NPR 9501.2, NASA Contractor Financial Management Reporting System), use the clause with...

  20. 14 CFR § 1201.400 - NASA procurement program.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false NASA procurement program. § 1201.400... ORGANIZATION AND GENERAL INFORMATION General Information § 1201.400 NASA procurement program. (a) The Office of... contact for NASA procurements. Although the procurements may be made by the field installations,...

  1. 48 CFR 1835.016-71 - NASA Research Announcements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false NASA Research... NASA Research Announcements. (a) Scope. An NRA is used to announce research interests in support of NASA's programs, and, after peer or scientific review using factors in the NRA, select proposals...

  2. 14 CFR 1216.103 - Responsibilities of NASA officials.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false Responsibilities of NASA officials. 1216... QUALITY Policy on Environmental Quality and Control § 1216.103 Responsibilities of NASA officials. (a) The... NASA policies and positions on matters pertaining to environmental protection and enhancement;...

  3. 48 CFR 1832.412-70 - NASA Contract clauses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false NASA Contract clauses....412-70 NASA Contract clauses. When the clause at FAR 52.232-12 or its Alternates II or V are used, insert the clause at 1852.232-70, NASA Modification of FAR 52.232-12....

  4. 14 CFR 1245.109 - Assignment of title to NASA.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false Assignment of title to NASA. 1245.109... INTELLECTUAL PROPERTY RIGHTS Patent Waiver Regulations § 1245.109 Assignment of title to NASA. (a) The instrument of waiver set forth in § 1245.115(c) shall be voided by NASA with respect to the domestic title...

  5. 48 CFR 1815.7001 - NASA Ombudsman Program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false NASA Ombudsman Program... ADMINISTRATION CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Ombudsman 1815.7001 NASA Ombudsman Program. NASA's implementation of an ombudsman program is in NPR 5101.33, Procurement...

  6. 14 CFR 1201.400 - NASA procurement program.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false NASA procurement program. 1201.400 Section... AND GENERAL INFORMATION General Information § 1201.400 NASA procurement program. (a) The Office of... contact for NASA procurements. Although the procurements may be made by the field installations,...

  7. 14 CFR 1201.400 - NASA procurement program.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false NASA procurement program. 1201.400 Section... AND GENERAL INFORMATION General Information § 1201.400 NASA procurement program. (a) The Office of... contact for NASA procurements. Although the procurements may be made by the field installations,...

  8. 14 CFR 1201.400 - NASA procurement program.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false NASA procurement program. 1201.400 Section... AND GENERAL INFORMATION General Information § 1201.400 NASA procurement program. (a) The Office of... contact for NASA procurements. Although the procurements may be made by the field installations,...

  9. 14 CFR 1216.303 - Responsibilities of NASA officials.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Responsibilities of NASA officials. 1216... Responsibilities of NASA officials. (a) The Associate Administrator for Management or designee, who is responsible... considered in all NASA planning and decisionmaking, shall: (1) Monitor these processes to ensure that...

  10. 14 CFR § 1216.103 - Responsibilities of NASA officials.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false Responsibilities of NASA officials. § 1216... ENVIRONMENTAL QUALITY Policy on Environmental Quality and Control § 1216.103 Responsibilities of NASA officials... revision of NASA policies and positions on matters pertaining to environmental protection and...

  11. 14 CFR 1245.109 - Assignment of title to NASA.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Assignment of title to NASA. 1245.109... INTELLECTUAL PROPERTY RIGHTS Patent Waiver Regulations § 1245.109 Assignment of title to NASA. (a) The instrument of waiver set forth in § 1245.115(c) shall be voided by NASA with respect to the domestic title...

  12. 14 CFR 1216.303 - Responsibilities of NASA officials.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Responsibilities of NASA officials. 1216... Responsibilities of NASA officials. (a) The Associate Administrator for Management or designee, who is responsible... considered in all NASA planning and decisionmaking, shall: (1) Monitor these processes to ensure that...

  13. 48 CFR 1837.203 - Policy. (NASA supplements paragraph (c))

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Policy. (NASA supplements... Services 1837.203 Policy. (NASA supplements paragraph (c)) (c) Advisory and assistance services of... 3300.1, Appointment of Personnel To/From NASA, Chapter 4, Employment of Experts and Consultants)....

  14. 48 CFR 1816.402-270 - NASA technical performance incentives.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false NASA technical performance incentives. 1816.402-270 Section 1816.402-270 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND....402-270 NASA technical performance incentives. (a) Pursuant to the guidelines in 1816.402, NASA...

  15. 48 CFR 1835.016-71 - NASA Research Announcements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false NASA Research... NASA Research Announcements. (a) Scope. An NRA is used to announce research interests in support of NASA's programs, and, after peer or scientific review using factors in the NRA, select proposals...

  16. 48 CFR 1815.7001 - NASA Ombudsman Program.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false NASA Ombudsman Program... ADMINISTRATION CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Ombudsman 1815.7001 NASA Ombudsman Program. NASA's implementation of an ombudsman program is in NPR 5101.33, Procurement...

  17. 48 CFR 1850.104-70 - Lead NASA installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Lead NASA installation... Actions 1850.104-70 Lead NASA installation. (a) Contractors applying for indemnification shall determine which NASA installation has the highest dollar amount of contracts for which indemnification...

  18. 14 CFR 1216.103 - Responsibilities of NASA officials.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Responsibilities of NASA officials. 1216... QUALITY Policy on Environmental Quality and Control § 1216.103 Responsibilities of NASA officials. (a) The... NASA policies and positions on matters pertaining to environmental protection and enhancement;...

  19. 48 CFR 1832.412-70 - NASA Contract clauses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false NASA Contract clauses....412-70 NASA Contract clauses. When the clause at FAR 52.232-12 or its Alternates II or V are used, insert the clause at 1852.232-70, NASA Modification of FAR 52.232-12....

  20. 48 CFR 1852.233-70 - Protests to NASA.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Protests to NASA. 1852.233... 1852.233-70 Protests to NASA. As prescribed in 1833.106-70, insert the following provision: Protests to NASA (OCT 2002) Potential bidders or offerors may submit a protest under 48 CFR part 33 (FAR part...

  1. 48 CFR 1837.203 - Policy. (NASA supplements paragraph (c))

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Policy. (NASA supplements... Services 1837.203 Policy. (NASA supplements paragraph (c)) (c) Advisory and assistance services of... 3300.1, Appointment of Personnel To/From NASA, Chapter 4, Employment of Experts and Consultants)....

  2. 48 CFR 1835.016-71 - NASA Research Announcements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false NASA Research... NASA Research Announcements. (a) Scope. An NRA is used to announce research interests in support of NASA's programs, and, after peer or scientific review using factors in the NRA, select proposals...

  3. 14 CFR 1245.109 - Assignment of title to NASA.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Assignment of title to NASA. 1245.109... INTELLECTUAL PROPERTY RIGHTS Patent Waiver Regulations § 1245.109 Assignment of title to NASA. (a) The instrument of waiver set forth in § 1245.115(c) shall be voided by NASA with respect to the domestic title...

  4. 48 CFR 1816.402-270 - NASA technical performance incentives.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false NASA technical performance incentives. 1816.402-270 Section 1816.402-270 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND....402-270 NASA technical performance incentives. (a) Pursuant to the guidelines in 1816.402, NASA...

  5. 48 CFR 1852.233-70 - Protests to NASA.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Protests to NASA. 1852.233... 1852.233-70 Protests to NASA. As prescribed in 1833.106-70, insert the following provision: Protests to NASA (OCT 2002) Potential bidders or offerors may submit a protest under 48 CFR part 33 (FAR part...

  6. 48 CFR 1837.203 - Policy. (NASA supplements paragraph (c))

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Policy. (NASA supplements... Services 1837.203 Policy. (NASA supplements paragraph (c)) (c) Advisory and assistance services of... 3300.1, Appointment of Personnel To/From NASA, Chapter 4, Employment of Experts and Consultants)....

  7. 48 CFR 1852.233-70 - Protests to NASA.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Protests to NASA. 1852.233... 1852.233-70 Protests to NASA. As prescribed in 1833.106-70, insert the following provision: Protests to NASA (OCT 2002) Potential bidders or offerors may submit a protest under 48 CFR part 33 (FAR part...

  8. 48 CFR 1816.402-270 - NASA technical performance incentives.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false NASA technical performance incentives. 1816.402-270 Section 1816.402-270 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND....402-270 NASA technical performance incentives. (a) Pursuant to the guidelines in 1816.402, NASA...

  9. 48 CFR 1815.7001 - NASA Ombudsman Program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false NASA Ombudsman Program... ADMINISTRATION CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Ombudsman 1815.7001 NASA Ombudsman Program. NASA's implementation of an ombudsman program is in NPR 5101.33, Procurement...

  10. 'Endurance Crater's' Dazzling Dunes (false-color)

    NASA Technical Reports Server (NTRS)

    2004-01-01

    As NASA's Mars Exploration Rover Opportunity creeps farther into 'Endurance Crater,' the dune field on the crater floor appears even more dramatic. This false-color image taken by the rover's panoramic camera shows that the dune crests have accumulated more dust than the flanks of the dunes and the flat surfaces between them. Also evident is a 'blue' tint on the flat surfaces as compared to the dune flanks. This results from the presence of the hematite-containing spherules ('blueberries') that accumulate on the flat surfaces.

    Sinuous tendrils of sand less than 1 meter (3.3 feet) high extend from the main dune field toward the rover. Scientists hope to send the rover down to one of these tendrils in an effort to learn more about the characteristics of the dunes. Dunes are a common feature across the surface of Mars, and knowledge gleaned from investigating the Endurance dunes close-up may apply to similar dunes elsewhere.

    Before the rover heads down to the dunes, rover drivers must first establish whether the slippery slope that leads to them is firm enough to ensure a successful drive back out of the crater. Otherwise, such hazards might make the dune field a true sand trap.

  11. Deep Hole in 'Clovis' (False Color)

    NASA Technical Reports Server (NTRS)

    2004-01-01

    At a rock called 'Clovis,' the rock abrasion tool on NASA's Mars Exploration Rover Spirit cut a 9-millimeter (0.35-inch) hole during the rover's 216th martian day, or sol (Aug. 11, 2004). The hole is the deepest drilled in a rock on Mars so far. This false color view was made from images taken by Spirit's panoramic camera on sol 226 (Aug. 21, 2004) at around 12:50 p.m. local true solar time -- early afternoon in Gusev Crater on Mars. To the right is a 'brush flower' of circles produced by scrubbing the surface of the rock with the abrasion tool's wire brush. Scientists used rover's Moessbauer spectrometer and alpha particle X-ray spectrometer to look for iron-bearing minerals and determine the elemental chemical composition of the rock. This composite combines images taken with the camera's 750-, 530-, and 430-nanometer filters. The grayish-blue hue in this image suggests that the interior of the rock contains iron minerals that are less oxidized than minerals on the surface. The diameter of the hole cut into the rock is 4.5 centimeters (1.8 inches).

  12. Possible and False Biomarkers from Space

    NASA Technical Reports Server (NTRS)

    Bernstein, Max P.

    2004-01-01

    The Search for life in the Solar System is one of NASA's main goals for the coming decade. We may never observe alien life directly; we or our robotic craft may always be removed from it by many years, or meters of crust. If we do find evidence of Life elsewhere in the Solar System it will probably be in form of chemical biomarkers, quintessentially biological molecules that indicate the presence of micro-organisms. What molecules would be truly indicative of alien life? Chlorophyll fragments, which are often used by geochemists are probably far too specific. Simpler molecules, such as fatty acids, amino acids and nucleo-bases might seem to be biomarkers, but they can form non-biotically in space. Alkyl substituted aromatics in ALH 84001 have been invoked as biomarkers, but they are not strong evidence in and of themselves. Understanding the range of nonbiological organic molecules which could act as false biomarkers in space is a prerequisite for any reasonable search for true biomarkers on other worlds. When simple organics arrive at the surface of a body like Europa, either from below or from space, how long do they survive and what do they make? How can we distinguish these from real biomarkers? In this talk I will present some ideas about what might be useful qualities to consider in a potential biomarker, and will ask for advice from the attendant geochemists.

  13. NASA metrication activities

    NASA Technical Reports Server (NTRS)

    Vlannes, P. N.

    1978-01-01

    NASA's organization and policy for metrification, history from 1964, NASA participation in Federal agency activities, interaction with nongovernmental metrication organizations, and the proposed metrication assessment study are reviewed.

  14. Abort Trigger False Positive and False Negative Analysis Methodology for Threshold-Based Abort Detection

    NASA Technical Reports Server (NTRS)

    Melcher, Kevin J.; Cruz, Jose A.; Johnson Stephen B.; Lo, Yunnhon

    2015-01-01

    This paper describes a quantitative methodology for bounding the false positive (FP) and false negative (FN) probabilities associated with a human-rated launch vehicle abort trigger (AT) that includes sensor data qualification (SDQ). In this context, an AT is a hardware and software mechanism designed to detect the existence of a specific abort condition. Also, SDQ is an algorithmic approach used to identify sensor data suspected of being corrupt so that suspect data does not adversely affect an AT's detection capability. The FP and FN methodologies presented here were developed to support estimation of the probabilities of loss of crew and loss of mission for the Space Launch System (SLS) which is being developed by the National Aeronautics and Space Administration (NASA). The paper provides a brief overview of system health management as being an extension of control theory; and describes how ATs and the calculation of FP and FN probabilities relate to this theory. The discussion leads to a detailed presentation of the FP and FN methodology and an example showing how the FP and FN calculations are performed. This detailed presentation includes a methodology for calculating the change in FP and FN probabilities that result from including SDQ in the AT architecture. To avoid proprietary and sensitive data issues, the example incorporates a mixture of open literature and fictitious reliability data. Results presented in the paper demonstrate the effectiveness of the approach in providing quantitative estimates that bound the probability of a FP or FN abort determination.

  15. Excluding False Positive Detections in Kepler Data

    NASA Astrophysics Data System (ADS)

    Caldwell, John J.; Ouvarova, T.; Borucki, W. J.

    2006-09-01

    The NASA Kepler Mission, scheduled for launch in 2008, will search for Earth-size planets orbiting Sun-like stars in or near habitable zones. A high precision photometer will search for planetary transits of parent stars. For a system similar to the Earth-Sun, the decrease in light during a central transit will be one part in 10,000 of the total stellar brightness out of transit. This poster discusses the effort to address a significant concern: the possibility of false positive detections of extra-solar Earth analogs. The concern arises because about 50 per cent of star systems are double or multiple. Further, because the photometer design is constrained by the requirement for high sensitivity to changes of low light levels, the optical resolution is not high compared to other space or terrestrial telescopes. If a relatively nearby Kepler target star happens to contain, within the Kepler PSF, an eclipsing binary system that is reduced in brightness by a factor of 10,000, say because it is 100 times farther away, the photometric profile of an eclipse could mimic a planetary transit. We have therefore developed a program to use archival data from the Hubble Space Telescope to quantify the number density of faint stars in the Kepler field that are in the brightness range that could cause confusion. Since the beginning of the project, the location of the Kepler field itself has been changed to optimize observing efficiency. The work originally included HST/WFPC2 data, and has now been expanded to ACS data as well. We present here a summary of completed and continuing work on faint background systems in the new Kepler field.

  16. Spirit View of 'Wishstone' (False Color)

    NASA Technical Reports Server (NTRS)

    2005-01-01

    [figure removed for brevity, see original site] Figure 1

    Scientists working with NASA's Mars Exploration Rover Spirit decided to examine this rock, dubbed 'Wishstone,' based on data from the miniature thermal emission spectrometer. That instrument's data indicated that the mineralogy of the rocks in this area is different from that of rocks encountered either on the plains of Gusev Crater or in bedrock outcrops examined so far in the 'Columbia Hills' inside the crater. Spirit used its rock abrasion tool first to scour a patch of the rock's surface with a wire brush, then to grind away the surface to reveal interior material. Placement of the rover's alpha particle X-ray spectrometer on the exposed circle of interior material revealed that the rock is rich in phosphorus. Spirit used its panoramic camera during the rover's 342nd martian day, or sol, (Dec. 18, 2004) to take the three individual images that were combined to produce this false-color view emphasizing the freshly ground dust around the hole cut by the rock abrasion tool.

    Unusually Rich in Phosophorus The graph in figure 1 compares the elemental makeup of a rock dubbed 'Wishstone' with the average composition of rocks that Spirit examined on the western spur of the 'Columbia Hills.' Wishstone lies farther into the hills than that spur. It is richer in phosphorus than any other Mars rock ever examined. Scientists plan to examine other rocks near Wishstone to help explain the significance of the high phosphorus concentration. The vertical scale is the ratio of the concentration of an element in the hills rocks to the concentration of the same element in a typical volcanic rock from the plains that Spirit crossed to reach the hills.

  17. NASA Systems Engineering Handbook

    NASA Technical Reports Server (NTRS)

    Shishko, Robert; Aster, Robert; Chamberlain, Robert G.; Mcduffee, Patrick; Pieniazek, Les; Rowell, Tom; Bain, Beth; Cox, Renee I.; Mooz, Harold; Polaski, Lou

    1995-01-01

    This handbook brings the fundamental concepts and techniques of systems engineering to NASA personnel in a way that recognizes the nature of NASA systems and environment. It is intended to accompany formal NASA training courses on systems engineering and project management when appropriate, and is designed to be a top-level overview. The concepts were drawn from NASA field center handbooks, NMI's/NHB's, the work of the NASA-wide Systems Engineering Working Group and the Systems Engineering Process Improvement Task team, several non-NASA textbooks and guides, and material from independent systems engineering courses taught to NASA personnel. Five core chapters cover systems engineering fundamentals, the NASA Project Cycle, management issues in systems engineering, systems analysis and modeling, and specialty engineering integration. It is not intended as a directive. Superseded by: NASA/SP-2007-6105 Rev 1 (20080008301).

  18. NASA's unique networking environment

    NASA Technical Reports Server (NTRS)

    Johnson, Marjory J.

    1988-01-01

    Networking is an infrastructure technology; it is a tool for NASA to support its space and aeronautics missions. Some of NASA's networking problems are shared by the commercial and/or military communities, and can be solved by working with these communities. However, some of NASA's networking problems are unique and will not be addressed by these other communities. Individual characteristics of NASA's space-mission networking enviroment are examined, the combination of all these characteristics that distinguish NASA's networking systems from either commercial or military systems is explained, and some research areas that are important for NASA to pursue are outlined.

  19. 49 CFR 520.2 - Policy.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 6 2012-10-01 2012-10-01 false Policy. 520.2 Section 520.2 Transportation Other Regulations Relating to Transportation (Continued) NATIONAL HIGHWAY TRAFFIC SAFETY ADMINISTRATION, DEPARTMENT... affect the quality of the human environment....

  20. 48 CFR 7.300 - [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false 7.300 Section 7.300 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING ACQUISITION PLANNING Contractor Versus Government Performance 7.300...

  1. 48 CFR 232.502 - Preaward matters.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Preaward matters. 232.502 Section 232.502 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT....502 Preaward matters....

  2. 48 CFR 232.503 - Postaward matters.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Postaward matters. 232.503 Section 232.503 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT....503 Postaward matters....

  3. 48 CFR 225.7703 - Acquisition of products or services other than small arms.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Acquisition of products or services other than small arms. 225.7703 Section 225.7703 Federal Acquisition Regulations System DEFENSE... than small arms....

  4. 49 CFR 220.2 - [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false 220.2 Section 220.2 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS General § 220.2...

  5. 47 CFR 10.310 - Federal alert gateway. [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false Federal alert gateway. 10.310 Section 10.310 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL MOBILE ALERT SYSTEM System Architecture § 10.310 Federal alert gateway....

  6. 47 CFR 10.300 - Alert aggregator. [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false Alert aggregator. 10.300 Section 10.300 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL MOBILE ALERT SYSTEM System Architecture § 10.300 Alert aggregator....

  7. 48 CFR 628.309 - Contract clauses for workers' compensation insurance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Contract clauses for workers' compensation insurance. 628.309 Section 628.309 Federal Acquisition Regulations System DEPARTMENT... workers' compensation insurance....

  8. 48 CFR 53.301-1423 - Inventory Verification Survey.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 2 2012-10-01 2012-10-01 false Inventory Verification Survey. 53.301-1423 Section 53.301-1423 Federal Acquisition Regulations System FEDERAL ACQUISITION... Survey. ER05AP04.000...

  9. 49 CFR 178.347 - Specification DOT 407; cargo tank motor vehicle.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Specification DOT 407; cargo tank motor vehicle...) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SPECIFICATIONS FOR PACKAGINGS Specifications for Containers for Motor Vehicle Transportation §...

  10. 49 CFR 178.348 - Specification DOT 412; cargo tank motor vehicle.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Specification DOT 412; cargo tank motor vehicle...) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SPECIFICATIONS FOR PACKAGINGS Specifications for Containers for Motor Vehicle Transportation §...

  11. 49 CFR 178.346 - Specification DOT 406; cargo tank motor vehicle.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Specification DOT 406; cargo tank motor vehicle...) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SPECIFICATIONS FOR PACKAGINGS Specifications for Containers for Motor Vehicle Transportation §...

  12. 48 CFR 970.0370 - Management Controls and Improvements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal Conflicts of Interest 970.0370 Management Controls and Improvements. ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Management Controls...

  13. 48 CFR 1327.201 - Patent and copyright infringement liability.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Patent and copyright... GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Patents and Copyrights 1327.201 Patent and copyright infringement liability....

  14. 48 CFR 27.201 - Patent and copyright infringement liability.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Patent and copyright... REGULATION GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Patents and Copyrights 27.201 Patent and copyright infringement liability....

  15. 48 CFR 1427.201 - Patent and copyright infringement liability.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Patent and copyright... INTERIOR GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Patents and Copyrights 1427.201 Patent and copyright infringement liability....

  16. 47 CFR 22.703 - Separate rural subscriber station authorization not required.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... or base station from which they receive service. ... 47 Telecommunication 2 2012-10-01 2012-10-01 false Separate rural subscriber station authorization... subscriber station authorization not required. A separate authorization is not required for rural...

  17. 48 CFR 1850.104 - Residual powers.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Residual powers. 1850.104 Section 1850.104 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION... 1850.104 Residual powers....

  18. 48 CFR 970.5001 - Residual powers.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Residual powers. 970.5001 Section 970.5001 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY....5001 Residual powers....

  19. 48 CFR 250.104 - Residual powers.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Residual powers. 250.104 Section 250.104 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT... Contractual Actions 250.104 Residual powers....

  20. 48 CFR 206.302-3 - Industrial mobilization; or engineering, development, or research capability.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Industrial mobilization; or engineering, development, or research capability. 206.302-3 Section 206.302-3 Federal Acquisition... engineering, development, or research capability....

  1. 48 CFR 1815.609 - Limited use of data.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Limited use of data. 1815.609 Section 1815.609 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... Limited use of data....

  2. 48 CFR 27.204 - Patented technology under trade agreements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Patented technology under trade agreements. 27.204 Section 27.204 Federal Acquisition Regulations System FEDERAL ACQUISITION... Patented technology under trade agreements....

  3. 43 CFR 2912.1 - Nature of interest.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Nature of interest. 2912.1 Section 2912.1 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT... Nature of interest....

  4. 49 CFR 236.764 - Locking, lever operated.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Locking, lever operated. 236.764 Section 236.764... Locking, lever operated. The mechanical locking of an interlocking machine which is actuated by means of the lever....

  5. 42 CFR 5a.2 - Applicability.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false Applicability. 5a.2 Section 5a.2 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL PROVISIONS RURAL PHYSICIAN... Public Health Service Act....

  6. 48 CFR 25.702 - Prohibition on contracting with entities that conduct restricted business operations in Sudan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Prohibition on contracting with entities that conduct restricted business operations in Sudan. 25.702 Section 25.702 Federal... operations in Sudan....

  7. 46 CFR Appendix D to Subpart C of... - Ocean Transportation Intermediary (OTI) Group Bond Form [FMC-69

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 9 2012-10-01 2012-10-01 false Ocean Transportation Intermediary (OTI) Group Bond Form... OCEAN SHIPPING IN FOREIGN COMMERCE LICENSING, FINANCIAL RESPONSIBILITY REQUIREMENTS, AND GENERAL DUTIES FOR OCEAN TRANSPORTATION INTERMEDIARIES Financial Responsibility Requirements; Claims Against...

  8. 47 CFR 76.227 - [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 4 2012-10-01 2012-10-01 false 76.227 Section 76.227 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Cablecasting § 76.227...

  9. 42 CFR 422.672 - Appointment of representatives.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 3 2012-10-01 2012-10-01 false Appointment of representatives. 422.672 Section 422.672 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES... prohibited by law....

  10. 47 CFR 27.59 - [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 2 2012-10-01 2012-10-01 false 27.59 Section 27.59 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES MISCELLANEOUS WIRELESS COMMUNICATIONS SERVICES Technical Standards § 27.59...

  11. 48 CFR 25.703 - Prohibition on contracting with entities that engage in certain activities relating to Iran.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Prohibition on contracting with entities that engage in certain activities relating to Iran. 25.703 Section 25.703 Federal... to Iran....

  12. 48 CFR 803.570 - Commercial advertising.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Commercial advertising. 803.570 Section 803.570 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS GENERAL... Commercial advertising....

  13. 48 CFR 225.7009 - Restriction on ball and roller bearings.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Restriction on ball and roller bearings. 225.7009 Section 225.7009 Federal Acquisition Regulations System DEFENSE ACQUISITION... roller bearings....

  14. 48 CFR 4.501 - [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false 4.501 Section 4.501 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL ADMINISTRATIVE MATTERS Electronic Commerce in Contracting 4.501...

  15. 48 CFR 504.570 - [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false 504.570 Section 504.570 Federal Acquisition Regulations System GENERAL SERVICES ADMINISTRATION GENERAL ADMINISTRATIVE MATTERS Electronic Commerce in Contracting 504.570...

  16. 48 CFR 504.500 - [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false 504.500 Section 504.500 Federal Acquisition Regulations System GENERAL SERVICES ADMINISTRATION GENERAL ADMINISTRATIVE MATTERS Electronic Commerce in Contracting 504.500...

  17. 48 CFR 970.3770 - Facilities management.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Facilities management. 970... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Facilities Management Contracting 970.3770 Facilities management....

  18. 48 CFR 970.2201-2 - Overtime management.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Overtime management. 970... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Application of Labor Policies 970.2201-2 Overtime management....

  19. 47 CFR 5.81 - Discontinuance of station operation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false Discontinuance of station operation. 5.81 Section 5.81 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL EXPERIMENTAL RADIO SERVICE (OTHER... Commission's Office of Engineering and Technology for cancellation....

  20. 49 CFR 37.169 - [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 1 2012-10-01 2012-10-01 false 37.169 Section 37.169 Transportation Office of the Secretary of Transportation TRANSPORTATION SERVICES FOR INDIVIDUALS WITH DISABILITIES (ADA) Provision of Service § 37.169...

  1. 49 CFR 37.39 - [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 1 2012-10-01 2012-10-01 false 37.39 Section 37.39 Transportation Office of the Secretary of Transportation TRANSPORTATION SERVICES FOR INDIVIDUALS WITH DISABILITIES (ADA) Applicability § 37.39...

  2. 48 CFR 219.502 - Setting aside acquisitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Setting aside acquisitions..., DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Set-Asides for Small Business 219.502 Setting aside acquisitions....

  3. 48 CFR 225.7004 - Restriction on acquisition of foreign buses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Restriction on acquisition of foreign buses. 225.7004 Section 225.7004 Federal Acquisition Regulations System DEFENSE... on acquisition of foreign buses....

  4. 48 CFR 3032.006 - Reduction or suspension of contract payments upon finding of fraud.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 7 2012-10-01 2012-10-01 false Reduction or suspension of contract payments upon finding of fraud. 3032.006 Section 3032.006 Federal Acquisition Regulations System... finding of fraud....

  5. 46 CFR 308.305 - [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 8 2012-10-01 2012-10-01 false 308.305 Section 308.305 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE Second Seamen's War Risk Insurance § 308.305...

  6. 46 CFR 308.301 - [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 8 2012-10-01 2012-10-01 false 308.301 Section 308.301 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE Second Seamen's War Risk Insurance § 308.301...

  7. 48 CFR 1524.104 - Solicitation provisions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Solicitation provisions....104 Solicitation provisions. The Contracting Officer shall insert the provision at 1552.224-70, Social... solicitations....

  8. 48 CFR 245.201 - Solicitation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Solicitation. 245.201... OF DEFENSE CONTRACT MANAGEMENT GOVERNMENT PROPERTY Solicitation and Evaluation Procedures 245.201 Solicitation....

  9. 48 CFR 239.7201 - Solicitation requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Solicitation requirements... Standards 239.7201 Solicitation requirements. Contracting officers shall ensure that all applicable Federal Information Processing Standards are incorporated into solicitations....

  10. 48 CFR 2116.105 - Solicitation provision.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Solicitation provision... TYPES TYPES OF CONTRACTS Selecting Contract Types 2116.105 Solicitation provision. FAR 16.105 has no... solicitations....

  11. 48 CFR 606.570 - Solicitation provision.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Solicitation provision... ACQUISITION PLANNING COMPETITION REQUIREMENTS Competition Advocates 606.570 Solicitation provision. The... solicitations exceeding the simplified acquisition threshold....

  12. 48 CFR 514.201-6 - Solicitation provisions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Solicitation provisions... CONTRACTING METHODS AND CONTRACT TYPES SEALED BIDDING Solicitation of Bids 514.201-6 Solicitation provisions... solicitation....

  13. 48 CFR 970.0470 - Department of Energy Directives.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Department of Energy Directives. 970.0470 Section 970.0470 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY... Energy Directives....

  14. 49 CFR 178.33b - Specification 2S; inner nonrefillable plastic receptacles.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Specification 2S; inner nonrefillable plastic receptacles. 178.33b Section 178.33b Transportation Other Regulations Relating to Transportation (Continued... nonrefillable plastic receptacles....

  15. 50 CFR 600.735 - Penalties.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 50 Wildlife and Fisheries 12 2012-10-01 2012-10-01 false Penalties. 600.735 Section 600.735 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION... applicable law....

  16. 43 CFR 2650.3 - Lawful entries, lawful settlements, and mining claims.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Lawful entries, lawful settlements, and mining claims. 2650.3 Section 2650.3 Public Lands: Interior Regulations Relating to Public Lands... mining claims....

  17. 48 CFR 3017.204 - Contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 7 2012-10-01 2012-10-01 false Contracts. 3017.204... ACQUISITION REGULATION (HSAR) CONTRACT METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Options 3017.204 Contracts....

  18. 49 CFR 195.452 - Pipeline integrity management in high consequence areas.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Pipeline integrity management in high consequence...) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE Operation and Maintenance Pipeline...

  19. 47 CFR 24.710 - [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 2 2012-10-01 2012-10-01 false 24.710 Section 24.710 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES PERSONAL COMMUNICATIONS SERVICES Competitive Bidding Procedures for Broadband PCS §...

  20. 47 CFR 22.961-22.967 - [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 2 2012-10-01 2012-10-01 false 22.961-22.967 Section 22.961-22.967 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES PUBLIC MOBILE SERVICES Cellular Radiotelephone Service §§...

  1. 47 CFR 24.832 - [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 2 2012-10-01 2012-10-01 false 24.832 Section 24.832 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES PERSONAL COMMUNICATIONS SERVICES Interim Application, Licensing, and Processing Rules for Broadband PCS §...

  2. 47 CFR 24.101 - [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 2 2012-10-01 2012-10-01 false 24.101 Section 24.101 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES PERSONAL COMMUNICATIONS SERVICES Narrowband PCS §...

  3. 47 CFR 24.130 - [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 2 2012-10-01 2012-10-01 false 24.130 Section 24.130 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES PERSONAL COMMUNICATIONS SERVICES Narrowband PCS §...

  4. 47 CFR 24.320 - [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 2 2012-10-01 2012-10-01 false 24.320 Section 24.320 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES PERSONAL COMMUNICATIONS SERVICES Competitive Bidding Procedures for Narrowband PCS §...

  5. 49 CFR 580.6 - [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false 580.6 Section 580.6 Transportation Other Regulations Relating to Transportation (Continued) NATIONAL HIGHWAY TRAFFIC SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) ODOMETER DISCLOSURE REQUIREMENTS §...

  6. 47 CFR 24.713 - [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 2 2012-10-01 2012-10-01 false 24.713 Section 24.713 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES PERSONAL COMMUNICATIONS SERVICES Competitive Bidding Procedures for Broadband PCS §...

  7. 47 CFR 22.215 - [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 2 2012-10-01 2012-10-01 false 22.215 Section 22.215 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES PUBLIC MOBILE SERVICES Licensing Requirements and Procedures Competitive Bidding Procedures §...

  8. 47 CFR 32.15 - [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 2 2012-10-01 2012-10-01 false 32.15 Section 32.15 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES UNIFORM SYSTEM OF ACCOUNTS FOR TELECOMMUNICATIONS COMPANIES General Instructions §...

  9. 48 CFR 1511.011-79 - Information resources management.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Information resources... AGENCY ACQUISITION PLANNING DESCRIBING AGENCY NEEDS 1511.011-79 Information resources management. The... Resource Management, in all solicitations and contracts....

  10. 43 CFR 1784.4 - Public participation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Public participation. 1784.4 Section 1784.4 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT... Public participation....

  11. 48 CFR 5416.203 - Fixed-price contracts with economic price adjustment.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 7 2012-10-01 2012-10-01 false Fixed-price contracts with economic price adjustment. 5416.203 Section 5416.203 Federal Acquisition Regulations System DEFENSE... contracts with economic price adjustment....

  12. 48 CFR 225.7005 - Restriction on certain chemical weapons antidote.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Restriction on certain chemical weapons antidote. 225.7005 Section 225.7005 Federal Acquisition Regulations System DEFENSE... on certain chemical weapons antidote....

  13. 48 CFR 225.7017 - Utilization of domestic photovoltaic devices.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Utilization of domestic photovoltaic devices. 225.7017 Section 225.7017 Federal Acquisition Regulations System DEFENSE ACQUISITION... photovoltaic devices....

  14. 46 CFR 8.320 - Classification society authorization to issue international certificates.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 1 2012-10-01 2012-10-01 false Classification society authorization to issue... Classification society authorization to issue international certificates. (a) The Commandant may authorize a recognized classification society to issue certain international convention certificates. Authorization...

  15. 47 CFR 73.6023 - Distributed transmission systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 4 2012-10-01 2012-10-01 false Distributed transmission systems. 73.6023... RADIO BROADCAST SERVICES Class A Television Broadcast Stations § 73.6023 Distributed transmission... distributed transmission system....

  16. 46 CFR 154.516 - Piping: Hull protection.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 5 2012-10-01 2012-10-01 false Piping: Hull protection. 154.516 Section 154.516 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CERTAIN BULK DANGEROUS CARGOES SAFETY... manifolds; and (c) Pump seals....

  17. 48 CFR 215.404 - Proposal analysis.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Proposal analysis. 215.404 Section 215.404 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT... Proposal analysis....

  18. 47 CFR 74.643 - Interference to geostationary-satellites.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 4 2012-10-01 2012-10-01 false Interference to geostationary-satellites. 74... Television Broadcast Auxiliary Stations § 74.643 Interference to geostationary-satellites. Applicants and... geostationary-satellites....

  19. 47 CFR 80.333 - Stations in the maritime mobile-satellite service.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Stations in the maritime mobile-satellite..., Alarm, Urgency and Safety Procedures § 80.333 Stations in the maritime mobile-satellite service. The...-satellite service....

  20. 47 CFR 25.219 - [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 2 2012-10-01 2012-10-01 false 25.219 Section 25.219 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Technical Standards § 25.219...

  1. 47 CFR 2.1055 - Measurements required: Frequency stability.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false Measurements required: Frequency stability. 2.1055 Section 2.1055 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL FREQUENCY ALLOCATIONS AND RADIO TREATY MATTERS; GENERAL RULES AND REGULATIONS Equipment Authorization...

  2. 49 CFR 236.731 - Controller, circuit.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Controller, circuit. A device for opening and closing electric circuits. ... 49 Transportation 4 2012-10-01 2012-10-01 false Controller, circuit. 236.731 Section 236.731 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD...

  3. 49 CFR 236.720 - Circuit, common return.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Circuit, common return. A term applied where one wire is used for the return of more than one electric circuit. ... 49 Transportation 4 2012-10-01 2012-10-01 false Circuit, common return. 236.720 Section...

  4. 45 CFR 1627.7 - Tax sheltered annuities, retirement accounts and pensions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 4 2012-10-01 2012-10-01 false Tax sheltered annuities, retirement accounts and... SERVICES CORPORATION SUBGRANTS AND MEMBERSHIP FEES OR DUES § 1627.7 Tax sheltered annuities, retirement..., retirement account, or pension fund....

  5. 49 CFR 236.206 - Battery or power supply with respect to relay; location.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Battery or power supply with respect to relay... to relay; location. The battery or power supply for each signal control relay circuit, where an open... from the relay....

  6. 47 CFR 25.402 - [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 2 2012-10-01 2012-10-01 false 25.402 Section 25.402 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Competitive Bidding Procedures for DARS § 25.402...

  7. 48 CFR 1616.7002 - Clause-contracts based on cost analysis (experience rated).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Clause-contracts based on... FEHBP contracts based on cost analysis (experience rated). ... OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION...

  8. 48 CFR 219.401 - General.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false General. 219.401 Section 219.401 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF... point for interface with the SBA....

  9. 48 CFR 225.7003 - Restrictions on acquisition of specialty metals.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Restrictions on acquisition of specialty metals. 225.7003 Section 225.7003 Federal Acquisition Regulations System DEFENSE... Restrictions on acquisition of specialty metals....

  10. 49 CFR 178.33 - Specification 2P; inner nonrefillable metal receptacles.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Specification 2P; inner nonrefillable metal receptacles. 178.33 Section 178.33 Transportation Other Regulations Relating to Transportation (Continued... nonrefillable metal receptacles....

  11. 49 CFR 178.33a - Specification 2Q; inner nonrefillable metal receptacles.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Specification 2Q; inner nonrefillable metal receptacles. 178.33a Section 178.33a Transportation Other Regulations Relating to Transportation (Continued... nonrefillable metal receptacles....

  12. 49 CFR 229.303 - Applicability.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Applicability. 229.303 Section 229.303 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD LOCOMOTIVE SAFETY STANDARDS Locomotive Electronics §...

  13. 49 CFR 229.305 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Definitions. 229.305 Section 229.305 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD LOCOMOTIVE SAFETY STANDARDS Locomotive Electronics §...

  14. 50 CFR 38.5 - Emergency authority.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... NATIONAL WILDLIFE REFUGE SYSTEM MIDWAY ATOLL NATIONAL WILDLIFE REFUGE Executive Authority; Authorized... Midway Atoll National Wildlife Refuge. ... 50 Wildlife and Fisheries 9 2012-10-01 2012-10-01 false Emergency authority. 38.5 Section...

  15. 14 CFR 1206.402 - Documents available for inspection at NASA Information Centers.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Documents available for inspection at NASA... Agency Records § 1206.402 Documents available for inspection at NASA Information Centers. (a) Each NASA...) A master list and index of NASA Issuances, and a copy of all such issuances; (4) A list and index...

  16. 14 CFR 1274.920 - Responsibilities of the NASA technical officer.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Responsibilities of the NASA technical... Responsibilities of the NASA technical officer. Responsibilities of the NASA Technical Officer July 2002 (a) The NASA Agreement Officer and Technical Officer for this cooperative agreement are identified on...

  17. 14 CFR § 1221.104 - Establishment of the NASA Logotype.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false Establishment of the NASA Logotype. § 1221.104 Section § 1221.104 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia,...

  18. 14 CFR 1206.402 - Documents available for inspection at NASA Information Centers.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false Documents available for inspection at NASA... Agency Records § 1206.402 Documents available for inspection at NASA Information Centers. (a) Each NASA...) A master list and index of NASA Issuances, and a copy of all such issuances; (4) A list and index...

  19. 14 CFR 1221.204 - Proceedings of the NASA Incentive Awards Board.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Proceedings of the NASA Incentive Awards... NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR The Congressional Space Medal of Honor § 1221.204 Proceedings of the NASA Incentive Awards Board. The NASA Incentive Awards...

  20. 14 CFR 1206.402 - Documents available for inspection at NASA Information Centers.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Documents available for inspection at NASA... Agency Records § 1206.402 Documents available for inspection at NASA Information Centers. (a) Each NASA...) A master list and index of NASA Issuances, and a copy of all such issuances; (4) A list and index...

  1. 14 CFR 1274.920 - Responsibilities of the NASA technical officer.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false Responsibilities of the NASA technical... Responsibilities of the NASA technical officer. Responsibilities of the NASA Technical Officer July 2002 (a) The NASA Agreement Officer and Technical Officer for this cooperative agreement are identified on...

  2. 14 CFR § 1206.402 - Documents available for inspection at NASA Information Centers.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false Documents available for inspection at NASA... Agency Records § 1206.402 Documents available for inspection at NASA Information Centers. (a) Each NASA...) A master list and index of NASA Issuances, and a copy of all such issuances; (4) A list and index...

  3. 48 CFR 1823.7001 - NASA solicitation provisions and contract clauses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false NASA solicitation..., RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Safety and Health 1823.7001 NASA..., astronauts and pilots, the NASA workforce (including contractor employees working on NASA contracts), or...

  4. 48 CFR 1823.7001 - NASA solicitation provisions and contract clauses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false NASA solicitation..., RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Safety and Health 1823.7001 NASA..., astronauts and pilots, the NASA workforce (including contractor employees working on NASA contracts), or...

  5. 14 CFR 1267.400 - What are my responsibilities as a(n) NASA awarding official?

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false What are my responsibilities as a(n) NASA... NASA Awarding Officials § 1267.400 What are my responsibilities as a(n) NASA awarding official? As a(n) NASA awarding official, you must obtain each recipient's agreement, as a condition of the award,...

  6. 14 CFR § 1221.204 - Proceedings of the NASA Incentive Awards Board.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false Proceedings of the NASA Incentive Awards... ADMINISTRATION THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR The Congressional Space Medal of Honor § 1221.204 Proceedings of the NASA Incentive Awards Board. The NASA...

  7. 14 CFR 1221.204 - Proceedings of the NASA Incentive Awards Board.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Proceedings of the NASA Incentive Awards... NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR The Congressional Space Medal of Honor § 1221.204 Proceedings of the NASA Incentive Awards Board. The NASA Incentive Awards...

  8. 14 CFR § 1221.103 - Establishment of the NASA Insignia.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false Establishment of the NASA Insignia. § 1221.103 Section § 1221.103 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia,...

  9. 14 CFR 1267.400 - What are my responsibilities as a(n) NASA awarding official?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false What are my responsibilities as a(n) NASA... NASA Awarding Officials § 1267.400 What are my responsibilities as a(n) NASA awarding official? As a(n) NASA awarding official, you must obtain each recipient's agreement, as a condition of the award,...

  10. 14 CFR 1221.204 - Proceedings of the NASA Incentive Awards Board.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false Proceedings of the NASA Incentive Awards... NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR The Congressional Space Medal of Honor § 1221.204 Proceedings of the NASA Incentive Awards Board. The NASA Incentive Awards...

  11. 14 CFR 1274.920 - Responsibilities of the NASA technical officer.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Responsibilities of the NASA technical... Responsibilities of the NASA technical officer. Responsibilities of the NASA Technical Officer July 2002 (a) The NASA Agreement Officer and Technical Officer for this cooperative agreement are identified on...

  12. 14 CFR 1267.400 - What are my responsibilities as a(n) NASA awarding official?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false What are my responsibilities as a(n) NASA... NASA Awarding Officials § 1267.400 What are my responsibilities as a(n) NASA awarding official? As a(n) NASA awarding official, you must obtain each recipient's agreement, as a condition of the award,...

  13. 48 CFR 1823.7001 - NASA solicitation provisions and contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false NASA solicitation..., RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Safety and Health 1823.7001 NASA..., astronauts and pilots, the NASA workforce (including contractor employees working on NASA contracts), or...

  14. 14 CFR § 1274.920 - Responsibilities of the NASA technical officer.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false Responsibilities of the NASA technical... Responsibilities of the NASA technical officer. Responsibilities of the NASA Technical Officer July 2002 (a) The NASA Agreement Officer and Technical Officer for this cooperative agreement are identified on...

  15. 14 CFR § 1206.401 - Location of NASA Information Centers.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false Location of NASA Information Centers. Â... § 1206.401 Location of NASA Information Centers. (a) NASA will maintain the following Information Centers... which copies of Agency forms may be obtained: (1) NASA Headquarters (HQ) Information Center,...

  16. Building 1100--NASA

    NASA Technical Reports Server (NTRS)

    1996-01-01

    Building 1100 is the NASA administrative building. Services located in this building include two banks, a post office, barber shop, cafeteria, snack bar, travel agency, dry cleaners, the NASA Exchange retail store and medical facilities for employees.

  17. #NASATweetup @NASA_Langley

    NASA Video Gallery

    NASA Langley Research Center's first tweet-up involved a diverse group of more than 40 that included an astronaut's daughter, a physics student from Wisconsin, one of NASA's newest space camp crew ...

  18. The NASA Organization

    NASA Technical Reports Server (NTRS)

    1994-01-01

    This Handbook, effective 13 September 1994, documents the NASA organization, defines terms, and sets forth the policy and requirements for establishing, modifying, and documenting the NASA organizational structure and for assigning organizational responsibilities.

  19. NASA Geodynamics Program

    NASA Technical Reports Server (NTRS)

    1984-01-01

    Activities and achievements for the period of May 1983 to May 1984 for the NASA geodynamics program are summarized. Abstracts of papers presented at the Conference are inlcuded. Current publications associated with the NASA Geodynamics Program are listed.

  20. NASA Now: Rocket Engineering

    NASA Video Gallery

    What’s the difference between fission and fusion? What are the applications & benefits of nuclear power & propulsion at NASA? How can NASA gain nuclear energy’s benefits for space exploration? ...

  1. NASA systems engineering handbook

    NASA Astrophysics Data System (ADS)

    Shishko, Robert; Aster, Robert; Chamberlain, Robert G.; McDuffee, Patrick; Pieniazek, Les; Rowell, Tom; Bain, Beth; Cox, Renee I.; Mooz, Harold; Polaski, Lou

    1995-06-01

    This handbook brings the fundamental concepts and techniques of systems engineering to NASA personnel in a way that recognizes the nature of NASA systems and environment. It is intended to accompany formal NASA training courses on systems engineering and project management when appropriate, and is designed to be a top-level overview. The concepts were drawn from NASA field center handbooks, NMI's/NHB's, the work of the NASA-wide Systems Engineering Working Group and the Systems Engineering Process Improvement Task team, several non-NASA textbooks and guides, and material from independent systems engineering courses taught to NASA personnel. Five core chapters cover systems engineering fundamentals, the NASA Project Cycle, management issues in systems engineering, systems analysis and modeling, and specialty engineering integration. It is not intended as a directive.

  2. NASA Now: Balloon Research

    NASA Video Gallery

    In this NASA Now program, Debbie Fairbrother discusses two types of high-altitude balloons that NASA is using to test scientific instruments and spacecraft. She also talks about the Ideal Gas Law a...

  3. Chemical Engineering at NASA

    NASA Technical Reports Server (NTRS)

    Collins, Jacob

    2008-01-01

    This viewgraph presentation is a review of the career paths for chemicals engineer at NASA (specifically NASA Johnson Space Center.) The author uses his personal experience and history as an example of the possible career options.

  4. NASA strategic plan

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The NASA Strategic Plan is a living document. It provides far-reaching goals and objectives to create stability for NASA's efforts. The Plan presents NASA's top-level strategy: it articulates what NASA does and for whom; it differentiates between ends and means; it states where NASA is going and what NASA intends to do to get there. This Plan is not a budget document, nor does it present priorities for current or future programs. Rather, it establishes a framework for shaping NASA's activities and developing a balanced set of priorities across the Agency. Such priorities will then be reflected in the NASA budget. The document includes vision, mission, and goals; external environment; conceptual framework; strategic enterprises (Mission to Planet Earth, aeronautics, human exploration and development of space, scientific research, space technology, and synergy); strategic functions (transportation to space, space communications, human resources, and physical resources); values and operating principles; implementing strategy; and senior management team concurrence.

  5. 19 CFR 111.32 - False information.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 19 Customs Duties 1 2010-04-01 2010-04-01 false False information. 111.32 Section 111.32 Customs... CUSTOMS BROKERS Duties and Responsibilities of Customs Brokers § 111.32 False information. A broker must... procure the giving of, any false or misleading information or testimony in any matter pending before...

  6. History at NASA

    NASA Technical Reports Server (NTRS)

    1986-01-01

    The efforts of the National Aeronautics and Space Administration to capture and record the events of the past are described, particularly the research accomplishments of NASA's agency-wide history program. A concise guide to the historical research resources available at NASA Headquarters in Washington, D.C., at NASA facilities around the country, and through the federal records systems is given.

  7. The NASA Clinic System

    NASA Technical Reports Server (NTRS)

    Scarpa, Philip J.; Williams, Richard

    2009-01-01

    NASA maintains on site occupational health clinics at all Centers and major facilities NASA maintains an on-site clinic that offers comprehensive health care to astronauts at the Johnson Space Center NASA deploys limited health care capability to space and extreme environments Focus is always on preventive health care

  8. NASA's educational programs

    NASA Technical Reports Server (NTRS)

    Brown, Robert W.

    1990-01-01

    The educational programs of NASA's Educational Affairs Division are examined. The problem of declining numbers of science and engineering students is reviewed. The various NASA educational programs are described, including programs at the elementary and secondary school levels, teacher education programs, and undergraduate, graduate, and university faculty programs. The coordination of aerospace education activities and future plans for increasing NASA educational programs are considered.

  9. Doing business with NASA

    NASA Technical Reports Server (NTRS)

    1991-01-01

    A brochure that was designed to encourage contractors to do business with NASA is presented. The brochure is divided into six sections: (1) This is NASA; (2) The procurement process; (3) Marketing your capabilities; (4) Special assistance programs; (5) NASA field installations; and (6) Sources of additional help.

  10. 'Lyell' Panorama inside Victoria Crater (False Color)

    NASA Technical Reports Server (NTRS)

    2008-01-01

    During four months prior to the fourth anniversary of its landing on Mars, NASA's Mars Exploration Rover Opportunity examined rocks inside an alcove called 'Duck Bay' in the western portion of Victoria Crater. The main body of the crater appears in the upper right of this stereo panorama, with the far side of the crater lying about 800 meters (half a mile) away. Bracketing that part of the view are two promontories on the crater's rim at either side of Duck Bay. They are 'Cape Verde,' about 6 meters (20 feet) tall, on the left, and 'Cabo Frio,' about 15 meters (50 feet) tall, on the right. The rest of the image, other than sky and portions of the rover, is ground within Duck Bay.

    Opportunity's targets of study during the last quarter of 2007 were rock layers within a band exposed around the interior of the crater, about 6 meters (20 feet) from the rim. Bright rocks within the band are visible in the foreground of the panorama. The rover science team assigned informal names to three subdivisions of the band: 'Steno,' 'Smith,' and 'Lyell.'

    This view combines many images taken by Opportunity's panoramic camera (Pancam) from the 1,332nd through 1,379th Martian days, or sols, of the mission (Oct. 23 to Dec. 11, 2007). Images taken through Pancam filters centered on wavelengths of 753 nanometers, 535 nanometers and 432 nanometers were mixed to produce this view, which is presented in a false-color stretch to bring out subtle color differences in the scene. Some visible patterns in dark and light tones are the result of combining frames that were affected by dust on the front sapphire window of the rover's camera.

  11. Spirit's West Valley Panorama (False Color)

    NASA Technical Reports Server (NTRS)

    2008-01-01

    NASA'S Mars Exploration Rover Spirit captured this westward view from atop a low plateau where Sprit spent the closing months of 2007.

    After several months near the base of the plateau called 'Home Plate' in the inner basin of the Columbia Hills range inside Gusev Crater, Spirit climbed onto the eastern edge of the plateau during the rover's 1,306th Martian day, or sol, (Sept. 5, 2007). It examined rocks and soils at several locations on the southern half of Home Plate during September and October. It was perched near the western edge of Home Plate when it used its panoramic camera (Pancam) to take the images used in this view on sols 1,366 through 1,369 (Nov. 6 through Nov. 9, 2007). With its daily solar-energy supply shrinking as Martian summer turned to fall, Spirit then drove to the northern edge of Home Plate for a favorable winter haven. The rover reached that northward-tilting site in December, in time for the fourth Earth-year anniversary of its landing on Mars. Spirit reached Mars on Jan. 4, 2004, Universal Time (Jan. 3, 2004, Pacific Standard Time). It landed at a site at about the center of the horizon in this image.

    This panorama covers a scene spanning left to right from southwest to northeast. The western edge of Home Plate is in the foreground, generally lighter in tone than the more distant parts of the scene. A rock-dotted hill in the middle distance across the left third of the image is 'Tsiolkovski Ridge,' about 30 meters or 100 feet from the edge of Home Plate and about that same distance across. A bump on the horizon above the left edge of Tsiolkovski Ridge is 'Grissom Hill,' about 8 kilometers or 5 miles away. At right, the highest point of the horizon is 'Husband Hill,' to the north and about 800 meters or half a mile away.

    This view combines separate images taken through Pancam filters centered on wavelengths of 753 nanometers, 535 nanometers and 432 nanometers. It is presented in a false-color stretch to bring out subtle

  12. Panorama from 'Cape Verde' (False Color)

    NASA Technical Reports Server (NTRS)

    2007-01-01

    NASA's Mars Exploration Rover Opportunity captured this vista of 'Victoria Crater' from the viewpoint of 'Cape Verde,' one of the promontories that are part of the scalloped rim of the crater. Opportunity drove onto Cape Verde shortly after arriving at the rim of Victoria in September 2006. The view combines hundreds of exposures taken by the rover's panoramic camera (Pancam). The camera began taking the component images during Opportunity's 970th Martian day, or sol, on Mars (Oct. 16, 2006). Work on the panorama continued through the solar conjunction period, when Mars was nearly behind the sun from Earth's perspective and communications were minimized. Acquisition of images for this panorama was completed on Opportunity's 991st sol (Nov. 7, 2006).

    The top of Cape Verde is in the immediate foreground at the center of the image. To the left and right are two of the more gradually sloped bays that alternate with the cliff-faced capes or promontories around the rim of the crater. 'Duck Bay,' where Opportunity first reached the rim, is to the right. Beyond Duck Bay counterclockwise around the rim, the next promontory is 'Cabo Frio,' about 150 meters (500 feet) from the rover. On the left side of the panorama is 'Cape St. Mary,' the next promontory clockwise from Cape Verde and about 40 meters (130 feet) from the rover. The vantage point atop Cape Verde offered a good view of the rock layers in the cliff face of Cape St. Mary, which is about 15 meters or 50 feet tall. By about two weeks after the Pancam finished collecting the images for this panorama, Opportunity had driven to Cape St. Mary and was photographing Cape Verde's rock layers.

    The far side of the crater lies about 800 meters (half a mile) away, toward the southeast.

    This view combines images taken through three of the Pancam's filters, admitting light with wavelengths centered at 750 nanometers (near infrared), 530 nanometers (green) and 430 nanometers (violet). It is presented in false

  13. NASA Pocket Statistics

    NASA Technical Reports Server (NTRS)

    1995-01-01

    NASA Pocket Statistics is published for the use of NASA managers and their staff. Included herein is Administrative and Organizational information, summaries of Space Flight Activity including the NASA Major Launch Record, and NASA Procurement, Financial, and Manpower data. The NASA Major Launch Record includes all launches of Scout class and larger vehicles. Vehicle and spacecraft development flights are also included in the Major Launch Record. Shuttle missions are counted as one launch and one payload, where free flying payloads are not involved. Satellites deployed from the cargo bay of the Shuttle and placed in a separate orbit or trajectory are counted as an additional payload.

  14. NASA Thesaurus Data File

    NASA Technical Reports Server (NTRS)

    2012-01-01

    The NASA Thesaurus contains the authorized NASA subject terms used to index and retrieve materials in the NASA Aeronautics and Space Database (NA&SD) and NASA Technical Reports Server (NTRS). The scope of this controlled vocabulary includes not only aerospace engineering, but all supporting areas of engineering and physics, the natural space sciences (astronomy, astrophysics, planetary science), Earth sciences, and the biological sciences. The NASA Thesaurus Data File contains all valid terms and hierarchical relationships, USE references, and related terms in machine-readable form. The Data File is available in the following formats: RDF/SKOS, RDF/OWL, ZThes-1.0, and CSV/TXT.

  15. NASA Now: Microbes @ NASA: Early Earth Ecosystems

    NASA Video Gallery

    What may look like green slime growing on a pond is what scientists call a microbial mat! Why does NASA care about slime? Microbial mats are living examples of the most ancient biological communiti...

  16. NASA's Education Program

    NASA Technical Reports Server (NTRS)

    1993-01-01

    NASA's current education programs, which will be examined under its Strategic Plan for Education are presented. It is NASA's first goal to maintain this base - revising, expanding, or eliminating programs as necessary. Through NASA's second goal, new education reform initiatives will be added which specifically address NASA mission requirements, national educational reform, and Federal Coordinating Council for Science, Engineering, and Technology (FCCSET) priorities. The chapters in this publication are divided by educational levels, with additional sections on programs to improve the technological competence of students and on an array of NASA published materials to supplement programs. The resource section lists NASA's national and regional Teacher Resource Centers and introduces the reader to NASA's Central Operation of Resources for Educators (CORE), which distributes materials in audiovisual format.

  17. Technology's Role in NASA's Future

    NASA Video Gallery

    NASA Chief Technologist Bobby Braun talks to NASA managers about the vital role technology research and development will play in NASA's future. Braun discusses how NASA will use new technologies to...

  18. After Attempted Sample Delivery on Sol 60, False Color

    NASA Technical Reports Server (NTRS)

    2008-01-01

    This view from the Surface Stereo Imager on NASA's Phoenix Mars Lander on the mission's 60th Martian day, or sol, (July 26, 2008) was taken after the lander's scoop sprinkled a soil sample over Thermal and Evolved-Gas Analyzer (TEGA).

    The upper part of the picture shows the robotic arm scoop parked open-face down above the TEGA after delivery. The TEGA doors farthest to the right were open to receive the sample into one of TEGA's eight ovens. Not enough material reached the oven to allow an analysis to begin. Some of the soil sample can be seen at the bottom of the adjacent pair of doors.

    This view is presented in false color, which makes the reddish color of the soil-sample material easy to see.

    The Phoenix Mission is led by the University of Arizona, Tucson, on behalf of NASA. Project management of the mission is by NASA's Jet Propulsion Laboratory, Pasadena, Calif. Spacecraft development is by Lockheed Martin Space Systems, Denver.

  19. An Association Account of False Belief Understanding

    ERIC Educational Resources Information Center

    De Bruin, L. C.; Newen, A.

    2012-01-01

    The elicited-response false belief task has traditionally been considered as reliably indicating that children acquire an understanding of false belief around 4 years of age. However, recent investigations using spontaneous-response tasks suggest that false belief understanding emerges much earlier. This leads to a developmental paradox: if young…

  20. 20 CFR 356.3 - False claims.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 1 2011-04-01 2011-04-01 false False claims. 356.3 Section 356.3 Employees' Benefits RAILROAD RETIREMENT BOARD ADMINISTRATIVE REMEDIES FOR FRAUDULENT CLAIMS OR STATEMENTS CIVIL MONETARY PENALTY INFLATION ADJUSTMENT § 356.3 False claims. In the case of penalties assessed under 31...

  1. 20 CFR 356.3 - False claims.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 1 2010-04-01 2010-04-01 false False claims. 356.3 Section 356.3 Employees' Benefits RAILROAD RETIREMENT BOARD ADMINISTRATIVE REMEDIES FOR FRAUDULENT CLAIMS OR STATEMENTS CIVIL MONETARY PENALTY INFLATION ADJUSTMENT § 356.3 False claims. In the case of penalties assessed under 31...

  2. 30 CFR 281.5 - False statements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false False statements. 281.5 Section 281.5 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR OFFSHORE LEASING OF MINERALS OTHER THAN OIL, GAS, AND SULPHUR IN THE OUTER CONTINENTAL SHELF General § 281.5 False statements. Under...

  3. Internal NASA Study: NASAs Protoflight Research Initiative

    NASA Technical Reports Server (NTRS)

    Coan, Mary R.; Hirshorn, Steven R.; Moreland, Robert

    2015-01-01

    The NASA Protoflight Research Initiative is an internal NASA study conducted within the Office of the Chief Engineer to better understand the use of Protoflight within NASA. Extensive literature reviews and interviews with key NASA members with experience in both robotic and human spaceflight missions has resulted in three main conclusions and two observations. The first conclusion is that NASA's Protoflight method is not considered to be "prescriptive." The current policies and guidance allows each Program/Project to tailor the Protoflight approach to better meet their needs, goals and objectives. Second, Risk Management plays a key role in implementation of the Protoflight approach. Any deviations from full qualification will be based on the level of acceptable risk with guidance found in NPR 8705.4. Finally, over the past decade (2004 - 2014) only 6% of NASA's Protoflight missions and 6% of NASA's Full qualification missions experienced a publicly disclosed mission failure. In other words, the data indicates that the Protoflight approach, in and of it itself, does not increase the mission risk of in-flight failure. The first observation is that it would be beneficial to document the decision making process on the implementation and use of Protoflight. The second observation is that If a Project/Program chooses to use the Protoflight approach with relevant heritage, it is extremely important that the Program/Project Manager ensures that the current project's requirements falls within the heritage design, component, instrument and/or subsystem's requirements for both the planned and operational use, and that the documentation of the relevant heritage is comprehensive, sufficient and the decision well documented. To further benefit/inform this study, a recommendation to perform a deep dive into 30 missions with accessible data on their testing/verification methodology and decision process to research the differences between Protoflight and Full Qualification

  4. E4 True and false color hot spot mosaic

    NASA Technical Reports Server (NTRS)

    1997-01-01

    True and false color views of Jupiter from NASA's Galileo spacecraft show an equatorial 'hotspot' on Jupiter. These images cover an area 34,000 kilometers by 11,000 kilometers (about 21,100 by 6,800 miles). The top mosaic combines the violet and near infrared continuum filter images to create an image similar to how Jupiter would appear to human eyes. Differences in coloration are due to the composition and abundances of trace chemicals in Jupiter's atmosphere. The bottom mosaic uses Galileo's three near-infrared wavelengths displayed in red, green, and blue) to show variations in cloud height and thickness. Bluish clouds are high and thin, reddish clouds are low, and white clouds are high and thick. The dark blue hotspot in the center is a hole in the deep cloud with an overlying thin haze. The light blue region to the left is covered by a very high haze layer. The multicolored region to the right has overlapping cloud layers of different heights. Galileo is the first spacecraft to distinguish cloud layers on Jupiter.

    North is at the top. The mosaic covers latitudes 1 to 10 degrees and is centered at longitude 336 degrees west. The smallest resolved features are tens of kilometers in size. These images were taken on December 17, 1996, at a range of 1.5 million kilometers (about 930,000 miles) by the Solid State Imaging camera system aboard Galileo. The Jet Propulsion Laboratory, Pasadena, CA manages the mission for NASA's Office of Space Science, Washington, DC.

    This image and other images and data received from Galileo are posted on the World Wide Web, on the Galileo mission home page at: http://galileo.jpl.nasa.gov. Background information and educational context for the images can be found at: http:/ /www.jpl.nasa.gov/galileo/sepo.

  5. False Color Terrain Model of Phoenix Workspace

    NASA Technical Reports Server (NTRS)

    2008-01-01

    This is a terrain model of Phoenix's Robotic Arm workspace. It has been color coded by depth with a lander model for context. The model has been derived using images from the depth perception feature from Phoenix's Surface Stereo Imager (SSI). Red indicates low-lying areas that appear to be troughs. Blue indicates higher areas that appear to be polygons.

    The Phoenix Mission is led by the University of Arizona, Tucson, on behalf of NASA. Project management of the mission is by NASA's Jet Propulsion Laboratory, Pasadena, Calif. Spacecraft development is by Lockheed Martin Space Systems, Denver.

  6. NASA Video Catalog

    NASA Technical Reports Server (NTRS)

    2006-01-01

    This issue of the NASA Video Catalog cites video productions listed in the NASA STI database. The videos listed have been developed by the NASA centers, covering Shuttle mission press conferences; fly-bys of planets; aircraft design, testing and performance; environmental pollution; lunar and planetary exploration; and many other categories related to manned and unmanned space exploration. Each entry in the publication consists of a standard bibliographic citation accompanied by an abstract. The Table of Contents shows how the entries are arranged by divisions and categories according to the NASA Scope and Subject Category Guide. For users with specific information, a Title Index is available. A Subject Term Index, based on the NASA Thesaurus, is also included. Guidelines for usage of NASA audio/visual material, ordering information, and order forms are also available.

  7. False discoveries and models for gene discovery.

    PubMed

    van den Oord, Edwin J C G; Sullivan, Patrick F

    2003-10-01

    In the search for genes underlying complex traits, there is a tendency to impose increasingly stringent criteria to avoid false discoveries. These stringent criteria make it hard to find true effects, and we argue that it might be better to optimize our procedures for eliminating and controlling false discoveries. Focusing on achieving an acceptable ratio of true- and false-positives, we show that false discoveries could be eliminated much more efficiently using a stepwise approach. To avoid a relatively high false discovery rate, corrections for 'multiple testing' might also be needed in candidate gene studies. If the appropriate methods are used, detecting the proportion of true effects appears to be a more important determinant of the genotyping burden than the desired false discovery rate. This raises the question of whether current models for gene discovery are shaped excessively by a fear of false discoveries.

  8. Gusev Rocks Solidified from Lava (False Color)

    NASA Technical Reports Server (NTRS)

    2006-01-01

    In recent weeks, as NASA's Mars Exploration Rover Spirit has driven through the basin south of 'Husband Hill,' it has been traversing mainly sand and dune deposits. This week, though, Spirit has been maneuvering along the edge of an arc-shaped feature called 'Lorre Ridge' and has encountered some spectacular examples of basaltic rocks with striking textures. This panoramic camera (Pancam) image shows a group of boulders informally named 'FuYi.' These basaltic rocks were formed by volcanic processes and may be a primary constituent of Lorre Ridge and other interesting landforms in the basin.

    Spirit first encountered basalts at its landing site two years ago, on a vast plain covered with solidified lava that appeared to have flowed across Gusev Crater. Later, basaltic rocks became rare as Spirit climbed Husband Hill. The basaltic rocks that Spirit is now seeing are interesting because they exhibit many small holes or vesicles, similar to some kinds of volcanic rocks on Earth. Vesicular rocks form when gas bubbles are trapped in lava flows and the rock solidifies around the bubbles. When the gas escapes, it leaves holes in the rock. The quantity of gas bubbles in rocks on Husband Hill varies considerably; some rocks have none and some, such as several here at FuYi, are downright frothy.

    The change in textures and the location of the basalts may be signs that Spirit is driving along the edge of a lava flow. This lava may be the same as the basalt blanketing the plains of Spirit's landing site, or it may be different. The large size and frothy nature of the boulders around Lorre Ridge might indicate that eruptions once took place at the edge of the lava flow, where the lava interacted with the rocks of the basin floor. Scientists hope to learn more as Spirit continues to investigate these rocks.

    As Earth approaches the Chinese New Year (The Year of the Dog), the Athena science team decided to use nicknames representing Chinese culture and geography

  9. NASA commercial programs

    NASA Technical Reports Server (NTRS)

    1988-01-01

    An expanded role for the U.S. private sector in America's space future has emerged as a key national objective, and NASA's Office of Commercial Programs is providing a focus for action. The Office supports new high technology commercial space ventures, the commercial application of existing aeronautics and space technology, and expanded commercial access to available NASA capabilities and services. The progress NASA has made in carrying out its new assignment is highlighted.

  10. NASA Hazard Analysis Process

    NASA Technical Reports Server (NTRS)

    Deckert, George

    2010-01-01

    This viewgraph presentation reviews The NASA Hazard Analysis process. The contents include: 1) Significant Incidents and Close Calls in Human Spaceflight; 2) Subsystem Safety Engineering Through the Project Life Cycle; 3) The Risk Informed Design Process; 4) Types of NASA Hazard Analysis; 5) Preliminary Hazard Analysis (PHA); 6) Hazard Analysis Process; 7) Identify Hazardous Conditions; 8) Consider All Interfaces; 9) Work a Preliminary Hazard List; 10) NASA Generic Hazards List; and 11) Final Thoughts

  11. Selling to NASA

    NASA Technical Reports Server (NTRS)

    1986-01-01

    Prospective contractors are acquainted with the organizational structure of NASA, and the major technical program offices and selected staff offices at the Headquarters level are briefly described. The basic procedures for Federal procurement are covered. A primer is presented on how to market to NASA. While the information is specific to NASA, many of the principles are applicable to other agencies as well. Some of the major programs are introduced which are available to small and disadvantaged businesses. The major research programs and fields of interest at individual NASA centers are summarized.

  12. NASA agenda for tomorrow

    NASA Technical Reports Server (NTRS)

    1988-01-01

    Key elements of national policy, NASA goals and objectives, and other materials that comprise the framework for NASA planning are included. The contents are expressed as they existed through much of 1988; thus they describe the strategic context employed by NASA in planning both the FY 1989 program just underway and the proposed FY 1990 program. NASA planning will continue to evolve in response to national policy requirements, a changing environment, and new opportunities. Agenda for Tomorrow provides a status report as of the time of its publication.

  13. NASA seeks comment

    NASA Astrophysics Data System (ADS)

    NASA is seeking public comment on a new science policy guide that will become the agency's major instrument for communication about its conduct of science. Called "Science in Air and Space: NASA's Science Policy Guide," the document will publish the framework for pursuing the agency's science goals."One of the most far-reaching discussions in the guide is how partnership—diverse representations of individuals, groups, and institutions—and contributions by the international scientific community are important to enhance the quality and vitality of NASA's science programs," said NASA's Chief Scientist, France Cordova.

  14. NASA Pocket Statistics

    NASA Technical Reports Server (NTRS)

    1994-01-01

    Pocket Statistics is published for the use of NASA managers and their staff. Included herein is Administrative and Organizational information, summaries of Space Flight Activity including the NASA Major Launch Record, and NASA Procurement, Financial, and Manpower data. The NASA Major Launch Record includes all launches of Scout class and larger vehicles. Vehicle and spacecraft development flights are also included in the Major Launch Record. Shuttle missions are counted as one launch and one payload, where free flying payloads are not involved. Satellites deployed from the cargo bay of the Shuttle and placed in a separate orbit or trajectory are counted as an additional payload.

  15. NASA Exploration Design Challenge

    NASA Video Gallery

    From the International Space Station, astronaut Sunita Williams welcomes participants to the NASA Exploration Design Challenge and explains the uncertainties about the effects of space radiation on...

  16. NASA International Environmental Partnerships

    NASA Technical Reports Server (NTRS)

    Lewis, Pattie; Valek, Susan

    2010-01-01

    For nearly five decades, the National Aeronautics and Space Administration (NASA) has been preeminent in space exploration. NASA has landed Americans on the moon, robotic rovers on Mars, and led cooperative scientific endeavors among nations aboard the International Space Station. But as Earth's population increases, the environment is subject to increasing challenges and requires more efficient use of resources. International partnerships give NASA the opportunity to share its scientific and engineering expertise. They also enable NASA to stay aware of continually changing international environmental regulations and global markets for materials that NASA uses to accomplish its mission. Through international partnerships, NASA and this nation have taken the opportunity to look globally for solutions to challenges we face here on Earth. Working with other nations provides NASA with collaborative opportunities with the global science/engineering community to explore ways in which to protect our natural resources, conserve energy, reduce the use of hazardous materials in space and earthly applications, and reduce greenhouse gases that potentially affect all of Earth's inhabitants. NASA is working with an ever-expanding list of international partners including the European Union, the European Space Agency and, especially, the nation of Portugal. Our common goal is to foster a sustainable future in which partners continue to explore the universe while protecting our home planet's resources for future generations. This brochure highlights past, current, and future initiatives in several important areas of international collaboration that can bring environmental, economic, and other benefits to NASA and the wider international space community.

  17. NASA's Flight Opportunities Program

    NASA Video Gallery

    NASA's Flight Opportunities Program is facilitating low-cost access to suborbital space, where researchers can test technologies using commercially developed vehicles. Suborbital flights can quickl...

  18. NASA HUNCH Hardware

    NASA Technical Reports Server (NTRS)

    Hall, Nancy R.; Wagner, James; Phelps, Amanda

    2014-01-01

    What is NASA HUNCH? High School Students United with NASA to Create Hardware-HUNCH is an instructional partnership between NASA and educational institutions. This partnership benefits both NASA and students. NASA receives cost-effective hardware and soft goods, while students receive real-world hands-on experiences. The 2014-2015 was the 12th year of the HUNCH Program. NASA Glenn Research Center joined the program that already included the NASA Johnson Space Flight Center, Marshall Space Flight Center, Langley Research Center and Goddard Space Flight Center. The program included 76 schools in 24 states and NASA Glenn worked with the following five schools in the HUNCH Build to Print Hardware Program: Medina Career Center, Medina, OH; Cattaraugus Allegheny-BOCES, Olean, NY; Orleans Niagara-BOCES, Medina, NY; Apollo Career Center, Lima, OH; Romeo Engineering and Tech Center, Washington, MI. The schools built various parts of an International Space Station (ISS) middeck stowage locker and learned about manufacturing process and how best to build these components to NASA specifications. For the 2015-2016 school year the schools will be part of a larger group of schools building flight hardware consisting of 20 ISS middeck stowage lockers for the ISS Program. The HUNCH Program consists of: Build to Print Hardware; Build to Print Soft Goods; Design and Prototyping; Culinary Challenge; Implementation: Web Page and Video Production.

  19. 14 CFR 1216.103 - Responsibilities of NASA officials.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Responsibilities of NASA officials. 1216... QUALITY Policy on Environmental Quality and Control § 1216.103 Responsibilities of NASA officials. (a) The... governmental and nongovernmental, advice and information useful in protecting and enhancing the quality of...

  20. 48 CFR 1832.502-470 - NASA contract clause.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false NASA contract clause. 1832.502-470 Section 1832.502-470 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... NASA contract clause. The contracting officer may insert a clause substantially as stated at...

  1. 48 CFR 1841.501-70 - NASA contract clause.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false NASA contract clause. 1841.501-70 Section 1841.501-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... 1841.501-70 NASA contract clause. The contracting officer shall insert the clause at...

  2. 48 CFR 1832.111-70 - NASA contract clause.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false NASA contract clause. 1832.111-70 Section 1832.111-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE....111-70 NASA contract clause. The contracting officer shall insert the clause at 1852.232-79,...

  3. 48 CFR 1832.111-70 - NASA contract clause.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false NASA contract clause. 1832.111-70 Section 1832.111-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE....111-70 NASA contract clause. The contracting officer shall insert the clause at 1852.232-79,...

  4. 48 CFR 1847.305-70 - NASA contract clauses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false NASA contract clauses. 1847.305-70 Section 1847.305-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACT MANAGEMENT TRANSPORTATION Transportation in Supply Contracts 1847.305-70 NASA...

  5. 48 CFR 1847.305-70 - NASA contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false NASA contract clauses. 1847.305-70 Section 1847.305-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACT MANAGEMENT TRANSPORTATION Transportation in Supply Contracts 1847.305-70 NASA...

  6. 48 CFR 1816.307-70 - NASA contract clauses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false NASA contract clauses. 1816.307-70 Section 1816.307-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... NASA contract clauses. (a) The contracting officer shall insert the clause at 1852.216-73,...

  7. 48 CFR 1827.409-70 - NASA contract clause.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false NASA contract clause. 1827.409-70 Section 1827.409-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE....409-70 NASA contract clause. The contracting officer shall use the clause at 1852.227-86,...

  8. 48 CFR 1827.409-70 - NASA contract clause.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false NASA contract clause. 1827.409-70 Section 1827.409-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE....409-70 NASA contract clause. The contracting officer shall use the clause at 1852.227-86,...

  9. 48 CFR 1811.404-70 - NASA contract clauses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false NASA contract clauses. 1811.404-70 Section 1811.404-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... 1811.404-70 NASA contract clauses. The clause at 1852.211-70, Packaging, Handling, and...

  10. 48 CFR 1813.302-570 - NASA solicitation provisions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false NASA solicitation provisions. 1813.302-570 Section 1813.302-570 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND... Acquisition Methods 1813.302-570 NASA solicitation provisions. (a)(1) The contracting officer may use...

  11. 48 CFR 1815.209-70 - NASA solicitation provisions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false NASA solicitation provisions. 1815.209-70 Section 1815.209-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND... Receipt of Proposals and Information 1815.209-70 NASA solicitation provisions. (a) The contracting...

  12. 48 CFR 1801.103 - Authority. (NASA supplements paragraph (a))

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Authority. (NASA supplements paragraph (a)) 1801.103 Section 1801.103 Federal Acquisition Regulations System NATIONAL..., Issuance 1801.103 Authority. (NASA supplements paragraph (a)) (a) Under the following authorities,...

  13. 48 CFR 1814.201-670 - NASA solicitation provisions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false NASA solicitation provisions. 1814.201-670 Section 1814.201-670 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND...-670 NASA solicitation provisions. (a) The contracting officer shall insert the provision at...

  14. 48 CFR 1841.501-70 - NASA contract clause.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false NASA contract clause. 1841.501-70 Section 1841.501-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... 1841.501-70 NASA contract clause. The contracting officer shall insert the clause at...

  15. 48 CFR 1811.404-70 - NASA contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false NASA contract clauses. 1811.404-70 Section 1811.404-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... 1811.404-70 NASA contract clauses. The clause at 1852.211-70, Packaging, Handling, and...

  16. 48 CFR 1825.003-70 - NASA definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false NASA definitions. 1825.003-70 Section 1825.003-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION 1825.003-70 NASA definitions. “Canadian end...

  17. 48 CFR 1844.204-70 - NASA contract clause.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false NASA contract clause. 1844.204-70 Section 1844.204-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... NASA contract clause. The contracting officer shall insert the clause at 1852.244-70,...

  18. 48 CFR 1815.209-70 - NASA solicitation provisions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false NASA solicitation provisions. 1815.209-70 Section 1815.209-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND... Receipt of Proposals and Information 1815.209-70 NASA solicitation provisions. (a) The contracting...

  19. 48 CFR 1813.003 - Policy. (NASA supplements paragraph (g))

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Policy. (NASA supplements paragraph (g)) 1813.003 Section 1813.003 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND... Policy. (NASA supplements paragraph (g)) (g) Acquisitions under these simplified acquisition...

  20. 48 CFR 1837.203-72 - NASA contract clauses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false NASA contract clauses. 1837.203-72 Section 1837.203-72 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... NASA contract clauses. (a) The contracting officer shall insert the clause at 1852.237-72, Access...

  1. 48 CFR 1832.502-470 - NASA contract clause.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false NASA contract clause. 1832.502-470 Section 1832.502-470 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... NASA contract clause. The contracting officer may insert a clause substantially as stated at...

  2. 48 CFR 1816.307-70 - NASA contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false NASA contract clauses. 1816.307-70 Section 1816.307-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... NASA contract clauses. (a) The contracting officer shall insert the clause at 1852.216-73,...

  3. 48 CFR 1801.103 - Authority. (NASA supplements paragraph (a))

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Authority. (NASA supplements paragraph (a)) 1801.103 Section 1801.103 Federal Acquisition Regulations System NATIONAL..., Issuance 1801.103 Authority. (NASA supplements paragraph (a)) (a) Under the following authorities,...

  4. 48 CFR 1832.502-470 - NASA contract clause.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false NASA contract clause. 1832.502-470 Section 1832.502-470 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... NASA contract clause. The contracting officer may insert a clause substantially as stated at...

  5. 48 CFR 1846.370 - NASA contract clauses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false NASA contract clauses. 1846.370 Section 1846.370 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 1846.370 NASA contract clauses. (a)...

  6. 48 CFR 1813.302-570 - NASA solicitation provisions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false NASA solicitation provisions. 1813.302-570 Section 1813.302-570 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND... Acquisition Methods 1813.302-570 NASA solicitation provisions. (a)(1) The contracting officer may use...

  7. 48 CFR 1814.201-670 - NASA solicitation provisions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false NASA solicitation provisions. 1814.201-670 Section 1814.201-670 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND...-670 NASA solicitation provisions. (a) The contracting officer shall insert the provision at...

  8. 48 CFR 1813.003 - Policy. (NASA supplements paragraph (g))

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Policy. (NASA supplements paragraph (g)) 1813.003 Section 1813.003 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND... Policy. (NASA supplements paragraph (g)) (g) Acquisitions under these simplified acquisition...

  9. 48 CFR 1813.003 - Policy. (NASA supplements paragraph (g))

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Policy. (NASA supplements paragraph (g)) 1813.003 Section 1813.003 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND... Policy. (NASA supplements paragraph (g)) (g) Acquisitions under these simplified acquisition...

  10. 14 CFR 1215.112 - User/NASA contractual arrangement.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false User/NASA contractual arrangement. 1215.112 Section 1215.112 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION TRACKING AND DATA... User/NASA contractual arrangement. No service shall be provided without an approved agreement....

  11. 48 CFR 1846.370 - NASA contract clauses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false NASA contract clauses. 1846.370 Section 1846.370 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 1846.370 NASA contract clauses. (a)...

  12. 48 CFR 1814.201-670 - NASA solicitation provisions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false NASA solicitation provisions. 1814.201-670 Section 1814.201-670 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND...-670 NASA solicitation provisions. (a) The contracting officer shall insert the provision at...

  13. 48 CFR 1847.305-70 - NASA contract clauses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false NASA contract clauses. 1847.305-70 Section 1847.305-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACT MANAGEMENT TRANSPORTATION Transportation in Supply Contracts 1847.305-70 NASA...

  14. 48 CFR 1815.209-70 - NASA solicitation provisions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false NASA solicitation provisions. 1815.209-70 Section 1815.209-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND... Receipt of Proposals and Information 1815.209-70 NASA solicitation provisions. (a) The contracting...

  15. 48 CFR 1846.370 - NASA contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false NASA contract clauses. 1846.370 Section 1846.370 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 1846.370 NASA contract clauses. (a)...

  16. 48 CFR 1844.204-70 - NASA contract clause.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false NASA contract clause. 1844.204-70 Section 1844.204-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... NASA contract clause. The contracting officer shall insert the clause at 1852.244-70,...

  17. 48 CFR 1837.203-72 - NASA contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false NASA contract clauses. 1837.203-72 Section 1837.203-72 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... NASA contract clauses. (a) The contracting officer shall insert the clause at 1852.237-72, Access...

  18. 48 CFR 1811.404-70 - NASA contract clauses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false NASA contract clauses. 1811.404-70 Section 1811.404-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... 1811.404-70 NASA contract clauses. The clause at 1852.211-70, Packaging, Handling, and...

  19. 48 CFR 1816.307-70 - NASA contract clauses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false NASA contract clauses. 1816.307-70 Section 1816.307-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... NASA contract clauses. (a) The contracting officer shall insert the clause at 1852.216-73,...

  20. 48 CFR 1843.205-70 - NASA contract clauses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false NASA contract clauses. 1843.205-70 Section 1843.205-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 1843.205-70 NASA contract clauses....

  1. 48 CFR 1844.204-70 - NASA contract clause.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false NASA contract clause. 1844.204-70 Section 1844.204-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... NASA contract clause. The contracting officer shall insert the clause at 1852.244-70,...

  2. 48 CFR 1825.003-70 - NASA definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false NASA definitions. 1825.003-70 Section 1825.003-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION 1825.003-70 NASA definitions. “Canadian end...

  3. 48 CFR 1825.003-70 - NASA definitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false NASA definitions. 1825.003-70 Section 1825.003-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION 1825.003-70 NASA definitions. “Canadian end...

  4. 48 CFR 1813.302-570 - NASA solicitation provisions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false NASA solicitation provisions. 1813.302-570 Section 1813.302-570 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND... Acquisition Methods 1813.302-570 NASA solicitation provisions. (a)(1) The contracting officer may use...

  5. 48 CFR 1841.501-70 - NASA contract clause.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false NASA contract clause. 1841.501-70 Section 1841.501-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... 1841.501-70 NASA contract clause. The contracting officer shall insert the clause at...

  6. 48 CFR 1837.203-72 - NASA contract clauses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false NASA contract clauses. 1837.203-72 Section 1837.203-72 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... NASA contract clauses. (a) The contracting officer shall insert the clause at 1852.237-72, Access...

  7. 48 CFR 1843.205-70 - NASA contract clauses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false NASA contract clauses. 1843.205-70 Section 1843.205-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 1843.205-70 NASA contract clauses....

  8. 48 CFR 1801.103 - Authority. (NASA supplements paragraph (a))

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Authority. (NASA supplements paragraph (a)) 1801.103 Section 1801.103 Federal Acquisition Regulations System NATIONAL..., Issuance 1801.103 Authority. (NASA supplements paragraph (a)) (a) Under the following authorities,...

  9. 48 CFR 1832.111-70 - NASA contract clause.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false NASA contract clause. 1832.111-70 Section 1832.111-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE....111-70 NASA contract clause. The contracting officer shall insert the clause at 1852.232-79,...

  10. 19 CFR 11.13 - False designations of origin and false descriptions; false marking of articles of gold or silver.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... descriptions; false marking of articles of gold or silver. 11.13 Section 11.13 Customs Duties U.S. CUSTOMS AND... gold or silver. (a) Articles which bear, or the containers which bear, false designations of origin, or.... 1405q, and shall be detained. (b) Articles made in whole or in part of gold or silver or alloys...

  11. 19 CFR 11.13 - False designations of origin and false descriptions; false marking of articles of gold or silver.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... descriptions; false marking of articles of gold or silver. 11.13 Section 11.13 Customs Duties U.S. CUSTOMS AND... gold or silver. (a) Articles which bear, or the containers which bear, false designations of origin, or.... 1405q, and shall be detained. (b) Articles made in whole or in part of gold or silver or alloys...

  12. 19 CFR 11.13 - False designations of origin and false descriptions; false marking of articles of gold or silver.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... descriptions; false marking of articles of gold or silver. 11.13 Section 11.13 Customs Duties U.S. CUSTOMS AND... gold or silver. (a) Articles which bear, or the containers which bear, false designations of origin, or.... 1405q, and shall be detained. (b) Articles made in whole or in part of gold or silver or alloys...

  13. 19 CFR 11.13 - False designations of origin and false descriptions; false marking of articles of gold or silver.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... descriptions; false marking of articles of gold or silver. 11.13 Section 11.13 Customs Duties U.S. CUSTOMS AND... gold or silver. (a) Articles which bear, or the containers which bear, false designations of origin, or.... 1405q, and shall be detained. (b) Articles made in whole or in part of gold or silver or alloys...

  14. 19 CFR 11.13 - False designations of origin and false descriptions; false marking of articles of gold or silver.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... descriptions; false marking of articles of gold or silver. 11.13 Section 11.13 Customs Duties U.S. CUSTOMS AND... gold or silver. (a) Articles which bear, or the containers which bear, false designations of origin, or.... 1405q, and shall be detained. (b) Articles made in whole or in part of gold or silver or alloys...

  15. Constructing rich false memories of committing crime.

    PubMed

    Shaw, Julia; Porter, Stephen

    2015-03-01

    Memory researchers long have speculated that certain tactics may lead people to recall crimes that never occurred, and thus could potentially lead to false confessions. This is the first study to provide evidence suggesting that full episodic false memories of committing crime can be generated in a controlled experimental setting. With suggestive memory-retrieval techniques, participants were induced to generate criminal and noncriminal emotional false memories, and we compared these false memories with true memories of emotional events. After three interviews, 70% of participants were classified as having false memories of committing a crime (theft, assault, or assault with a weapon) that led to police contact in early adolescence and volunteered a detailed false account. These reported false memories of crime were similar to false memories of noncriminal events and to true memory accounts, having the same kinds of complex descriptive and multisensory components. It appears that in the context of a highly suggestive interview, people can quite readily generate rich false memories of committing crime.

  16. NASA and General Aviation. NASA SP-485.

    ERIC Educational Resources Information Center

    Ethell, Jeffrey L.

    A detailed examination of the nature and function of general aviation and a discussion of how the National Aeronautics and Space Administration (NASA) helps keep it on the cutting edge of technology are offered in this publication. The intricacies of aerodynamics, energy, and safety as well as the achievements in aeronautical experimentation are…

  17. NASA educational publications

    NASA Technical Reports Server (NTRS)

    1987-01-01

    This is a catalog of educational and technical publications, sponsored by NASA, that are available to the general public from the Government Printing Office (GPO). The following types of publications are announced: periodicals, educational publications, NASA Facts, posters and wallsheets, other publications of interest to educators, scientific and technical publications, and educational materials from Regional Service Centers.

  18. NASA Now: Propulsion

    NASA Video Gallery

    In this episode of NASA Now, you’ll visit NASA’s Spacecraft Propulsion Research Facility, called B-2, at NASA Plum Brook Station. You’ll meet Dr. Louis Povinelli and Brian Jones who explain w...

  19. This is NASA

    NASA Technical Reports Server (NTRS)

    1971-01-01

    The organization, operations, functions, and objectives of NASA are outlined. Data include manned space flights, satellite weather observations, orbiting radio relays, and new views of the earth and beyond the earth as observed by satellites. Details of NASA's work in international programs, educational training programs, and adopting space technology to earth uses are also given.

  20. NASA Dryden Status

    NASA Technical Reports Server (NTRS)

    Jacobson, Steve R.

    2009-01-01

    This slide presentation reviews several projects that NASA Dryden personnel are involved with: Integrated Resilient Aircraft Controls Project (IRAC), NASA G-III Research Aircraft, X-48B Blended Wing Body aircraft, Stratospheric Observatory for Infrared Astronomy (SOFIA), and the Orion CEV Launch Abort Systems Tests.