  1. A 30 MW, 200 MHz Inductive Output Tube for RF Accelerators

    SciTech Connect

    R. Lawrence Ives; Michael Read

    2008-06-19

    This program investigated development of a multiple beam inductive output tube (IOT) to produce 30 MW pulses at 200 MHz. The program was successful in demonstrating feasibility of developing the source to achieve the desired power in microsecond pulses with 70% efficiency. The predicted gain of the device is 24 dB. Consequently, a 200 kW driver would be required for the RF input. Estimated cost of this driver is approximately $1.25 M. Given the estimated development cost of the IOT of approximately $750K and the requirements for a test set that would significantly increase the cost, it was determined that development could not be achieved within the funding constraints of a Phase II program.

  2. RF Power Upgrade for CEBAF at Jefferson Laboratory

    SciTech Connect

    Andrew Kimber,Richard Nelson

    2011-03-01

    Jefferson Laboratory (JLab) is currently upgrading the 6GeV Continuous Electron Beam Accelerator Facility (CEBAF) to 12GeV. As part of the upgrade, RF systems will be added, bringing the total from 340 to 420. Existing RF systems can provide up to 6.5 kW of CW RF at 1497 MHZ. The 80 new systems will provide increased RF power of up to 13 kW CW each. Built around a newly designed and higher efficiency 13 kW klystron developed for JLab by L-3 Communications, each new RF chain is a completely revamped system using hardware different than our present installations. This paper will discuss the main components of the new systems including the 13 kW klystron, waveguide isolator, and HV power supply using switch-mode technology. Methodology for selection of the various components and results of initial testing will also be addressed. Notice: Authored by Jefferson Science Associates, LLC under U.S. DOE Contract No. DE-AC05-06OR23177. The U.S. Government retains a non-exclusive, paid-up, irrevocable, world-wide license to publish or reproduce this manuscript for U.S. Government purposes.

  3. Robotics Work Starts Station Power Upgrade Before Spacewalks | Space ...

    NASA Website

    August 2016; July 2016; June 2016; May 2016; April 2016; March 2016; February 2016; January 2016; December 2015; November 2015; October 2015; ...

  4. Project: "Project!"

    ERIC Educational Resources Information Center

    Grayson, Katherine

    2007-01-01

    In November 2006, the editors of "Campus Technology" launched their first-ever High-Resolution Projection Study, to find out if the latest in projector technology could really make a significant difference in teaching, learning, and educational innovation on US campuses. The author and her colleagues asked campus educators,…

  5. Intelligent Vehicle Charging Benefits Assessment Using EV Project Data

    SciTech Connect

    Letendre, Steven; Gowri, Krishnan; Kintner-Meyer, Michael CW; Pratt, Richard M.

    2013-12-01

    PEVs can represent a significant power resource for the grid. An IVCI with bi-direction V2G capabilities would allow PEVs to provide grid support services and thus generate a source of revenue for PEV owners. The fleet of EV Project vehicles represents a power resource between 30 MW and 90 MW, depending on the power rating of the grid connection (5-15 kW). Aggregation of vehicle capacity would allow PEVs to participate in wholesale reserve capacity markets. One of the key insights from EV Project data is the fact that vehicles are connected to an EVSE much longer than is necessary to deliver a full charge. During these hours when the vehicles are not charging, they can be participating in wholesale power markets providing the high-value services of regulation and spinning reserves. The annual gross revenue potential for providing these services using the fleet of EV Project vehicles is several hundred thousands of dollars to several million dollars annually depending on the power rating of the grid interface, the number of hours providing grid services, and the market being served. On a per vehicle basis, providing grid services can generate several thousands of dollars over the life of the vehicle.

  6. Korea Research Reactor -1 & 2 Decommissioning Project in Korea

    SciTech Connect

    Park, S. K.; Chung, U. S.; Jung, K. J.; Park, J. H.

    2003-02-24

    Korea Research Reactor 1 (KRR-1), the first research reactor in Korea, has been operated since 1962, and the second one, Korea Research Reactor 2 (KRR-2) since 1972. The operation of both of them was phased out in 1995 due to their lifetime and operation of the new and more powerful research reactor, HANARO (High-flux Advanced Neutron Application Reactor; 30MW). Both are TRIGA Pool type reactors in which the cores are small self-contained units sitting in tanks filled with cooling water. The KRR-1 is a TRIGA Mark II, which could operate at a level of up to 250 kW. The second one, the KRR-2 is a TRIGA Mark III, which could operate at a level of up 2,000 kW. The decontamination and decommissioning (D & D) project of these two research reactors, the first D & D project in Korea, was started in January 1997 and will be completed to stage 3 by 2008. The aim of this decommissioning program is to decommission the KRR-1 & 2 reactors and to decontaminate the residual building structure s and the site to release them as unrestricted areas. KAERI (Korea Atomic Energy Research Institute) submitted the decommissioning plan and the environmental impact assessment reports to the Ministry of Science and Technology (MOST) for the license in December 1998, and was approved in November 2000.

  7. Project PRISM: Project Manual.

    ERIC Educational Resources Information Center

    Cunnion, Maryellen; And Others

    The first of three volumes of Project PRISM, a program designed to help classroom teachers (grades 6 through 8) provide for the needs of their gifted and talented students without removing those students from the mainstream of education, outlines the project's background and achievements. Sections review the following project aspects (sample…

  8. Project Notes

    ERIC Educational Resources Information Center

    School Science Review, 1978

    1978-01-01

    Presents sixteen project notes developed by pupils of Chipping Norton School and Bristol Grammar School, in the United Kingdom. These Projects include eight biology A-level projects and eight Chemistry A-level projects. (HM)

  9. Projects Work!

    ERIC Educational Resources Information Center

    Textor, Martin R.

    2005-01-01

    The great educational value of projects is emphasized by contrasting negative aspects of the life of today's children with the goals of project work. This is illustrated by a project "Shopping." It is shown what children are learning in such projects and what the advantages of project work are. Relevant topic areas, criteria for selecting a…

  10. Project Wild (Project Tame).

    ERIC Educational Resources Information Center

    Siegenthaler, David

    For 37 states in the United States, Project Wild has become an officially sanctioned, distributed and funded "environemtnal and conservation education program." For those who are striving to implement focused, sequential, learning programs, as well as those who wish to promote harmony through a non-anthropocentric world view, Project…

  11. Proposed power upgrade of the Hot Fuel Examination Facility's neutron radiography reactor. [NRAD reactor

    SciTech Connect

    Pruett, D.P.; Richards, W.J.; Heidel, C.C.

    1984-01-01

    The Hot Fuel Examination Facility, HFEF, is one of several facilities located at the Argonne Site. HFEF comprises a large hot cell where both non-destructive and destructive examination of highly-irradiated reactor fuels are conducted in support of the LMFBR program. One of the non-destructive examination techniques utilized at HFEF is neutron radiography. Neutron radiography is provided by the NRAD reactor facility, which is located beneath the HFEF hot cell. The NRAD reactor is a TRIGA reactor and is operated at a steady state power level of 250 kW solely for neutron radiography and the development of radiography techniques. When the NRAD facility was designed and constructed, an operating power level of 250 kW was considered to be adequate for obtaining radiographs of the type of specimens envisaged at that time. A typical radiograph required approximately a twenty-minute exposure time. Specimens were typically single fuel rods placed in an aluminum tray. Since that time, however, several things have occurred that have tended to increase radiography exposure times to as much as 90 minutes each. In order to decrease exposure times, the reactor power level is to be increased from 250 kw to 1 MW. This increase in power will necessitate several engineering and design changes. These changes are described.

  12. A new slip stacking RF system for a twofold power upgrade of Fermilab's Accelerator Complex

    SciTech Connect

    Madrak, Robyn

    2014-05-15

    Fermilab's Accelerator Complex has been recently upgraded, in order to increase the 120 GeV proton beam power on target from about 400 kW to over 700 kW for NOvA and other future intensity frontier experiments. One of the key ingredients of the upgrade is the offloading of some Main Injector synchrotron operations - beam injection and RF manipulation called ''slip stacking'' - to the 8GeV Recycler Ring, which had until recently been used only for low-intensity antiproton storage and cooling. This required construction of two new 53 MHz RF systems for the slip-stacking manipulations. The cavities operate simultaneously at Vpeak ≲150 kV, but at slightly different frequencies (Δf=1260 Hz). Their installation was completed in September 2013. This article describes the novel solutions used in the design of the new cavities, their tuning system, and the associated high power RF system. First results showing effective operation of the RF system, beam capture and successful slip-stacking in the Recycler Ring are presented.

  13. Achieving safety/risk goals for less ATR backup power upgrades

    SciTech Connect

    Atkinson, S.A.

    1995-10-01

    The Advanced Test Reactor probabilistic risk assessment for internal fire and flood events defined a relatively high risk for a total loss of electric power possibly leading to core damage. Backup power sources were disabled due to fire and flooding in the diesel generator area with propagation of the flooding to a common switchgear room. The ATR risk assessment was employed to define options for relocation of backup power system components to achieve needed risk reduction while minimizing costs. The risk evaluations were performed using sensitivity studies and importance measures. The risk-based evaluations of relocation options for backup power systems saved over $3 million from what might have been otherwise considered {open_quotes}necessary{close_quotes} for safety/risk improvement. The ATR experience shows that the advantages of a good risk assessment are to define risk significance, risk specifics, and risk solutions which enable risk goals to be achieved at the lowest cost.

  14. Map projections

    USGS Publications Warehouse

    ,

    1993-01-01

    A map projection is used to portray all or part of the round Earth on a flat surface. This cannot be done without some distortion. Every projection has its own set of advantages and disadvantages. There is no "best" projection. The mapmaker must select the one best suited to the needs, reducing distortion of the most important features. Mapmakers and mathematicians have devised almost limitless ways to project the image of the globe onto paper. Scientists at the U. S. Geological Survey have designed projections for their specific needs—such as the Space Oblique Mercator, which allows mapping from satellites with little or no distortion. This document gives the key properties, characteristics, and preferred uses of many historically important projections and of those frequently used by mapmakers today.

  15. Coal air turbine {open_quotes}CAT{close_quotes} program, Invention 604. Third quarter project report, April 1995--June 1995

    SciTech Connect

    Foster-Pegg, R.W.

    1995-07-31

    The primary objective of this {open_quotes}CAT{close_quotes} project is to complete a conceptual design of this unique new combination of existing technology with cost estimates to show that the {open_quotes}CAT{close_quotes} system offers the economic incentive with low technical risk for a plant to be built which will demonstrate its viability. The technologies involved in the components of a {open_quotes}CAT{close_quotes} plant are proven, and the integration of the components into a complete plant is the only new development activity involved. Industry and the Federal General Services Administration (GSA), require the demonstration of a {open_quotes}commercial plant{close_quotes} before the viability of a new concept is accepted. To satisfy this requirement and construction of a plant of commercially viable size in excess of 15 MW if cogeneration and above 30 MW if all power, is proposed. This plant will produce economical power and heat for the owner. The plant will operate a full commercial life and continue as an operating demonstration of the viability of the technology, gathering long term life and maintenance data, all adding to the credibility of the concept.

  16. Project SEED.

    ERIC Educational Resources Information Center

    Chemical and Engineering News, 1986

    1986-01-01

    Reports on Project SEED (Summer Educational Experience for the Disadvantaged) a project in which high school students from low-income families work in summer jobs in a variety of academic, industrial, and government research labs. The program introduces the students to career possibilities in chemistry and to the advantages of higher education.…

  17. Project EASIER.

    ERIC Educational Resources Information Center

    Alvord, David J.; Tack, Leland R.; Dallam, Jerald W.

    1998-01-01

    Describes the development of Project EASIER, a collaborative electronic-data interchange for networking Iowa local school districts, education agencies, community colleges, universities, and the Department of Education. The primary goal of this project is to develop and implement a system for collection of student information for state and federal…

  18. Project Success.

    ERIC Educational Resources Information Center

    Meredith, Larry D.

    Project Success consists of after-school, weekend, and summer educational programs geared toward minority and disadvantaged students to increase their numbers seeking postsecondary education from the Meadville, Pennsylvania area. The project is funded primarily through the Edinboro University of Pennsylvania, whose administration is committed to…

  19. Project CHILD.

    ERIC Educational Resources Information Center

    Robison, Helen F.; And Others

    This document described Project CHILD, a program of educational change and curriculum development for disadvantaged prekindergarten and kindergarten children. The historical part of this report indicates that the project began in 1966 with a small-scale study of teacher behavior and children's responses in a few classrooms in a Harlem school…

  20. Project FAST.

    ERIC Educational Resources Information Center

    Essexville-Hampton Public Schools, MI.

    Described are components of Project FAST (Functional Analysis Systems Training) a nationally validated project to provide more effective educational and support services to learning disordered children and their regular elementary classroom teachers. The program is seen to be based on a series of modules of delivery systems ranging from mainstream…

  1. Project LEAF

    EPA Pesticide Factsheets

    Project LEAF has a goal of educating farmworkers about how to reduce pesticide exposure to their families from pesticide residues they may be inadvertently taking home on their clothing, etc. Find outreach materials.

  2. Geodynamics Project

    ERIC Educational Resources Information Center

    Drake, Charles L.

    1977-01-01

    Describes activities of Geodynamics Project of the Federal Council on Science and Technology, such as the application of multichannel seismic-reflection techniques to study the nature of the deep crust and upper mantle. (MLH)

  3. Project Reptile!

    ERIC Educational Resources Information Center

    Diffily, Deborah

    2001-01-01

    Integrating curriculum is important in helping children make connections within and among areas. Presents a class project for kindergarten children which came out of the students' interests and desire to build a reptile exhibit. (ASK)

  4. Swedish Projects

    DTIC Science & Technology

    2005-12-01

    development, evaluate training regimes and design of new systems with complex man- machine interface problems. The project uses advanced statistical...physiological measures to provide input to adaptive man- machine interfaces . The goal of the projects is to further develop measurement methods with...dinteraction Homme -Système Intuitive)., The original document contains color images. 14. ABSTRACT 15. SUBJECT TERMS 16. SECURITY CLASSIFICATION OF: 17

  5. Maximum Capital Project Management.

    ERIC Educational Resources Information Center

    Adams, Matt

    2002-01-01

    Describes the stages of capital project planning and development: (1) individual capital project submission; (2) capital project proposal assessment; (3) executive committee; and (4) capital project execution. (EV)

  6. Project Artemis

    NASA Technical Reports Server (NTRS)

    Birchenough, Shawn; Kato, Denise; Kennedy, Fred; Akin, David

    1990-01-01

    The goals of Project Artemis are designed to meet the challege of President Bush to return to the Moon, this time to stay. The first goal of the project is to establish a permanent manned base on the Moon for the purposes of scientific research and technological development. The knowledge gained from the establishment and operations of the lunar base will then be used to achieve the second goal of Project Artemis, the establishment of a manned base on the Martian surface. Throughout both phases of the program, crew safety will be the number one priority. There are four main issues that have governed the entire program: crew safety and mission success, commonality, growth potential, and costing and scheduling. These issues are discussed in more detail.

  7. Apollo Project

    NASA Technical Reports Server (NTRS)

    1965-01-01

    Langley personnel at Cape Canaveral during preliminary checkout of Project FIRE velocity package before launch. Project FIRE (Flight Investigation Reentry Environment) studied the effects of reentry heating on spacecraft materials. It involved both wind tunnel and flight tests, although the majority were tests with Atlas rockets and recoverable reentry packages. These flight tests took place at Cape Canaveral in Florida. Wind tunnel tests were made in several Langley tunnels including the Unitary Plan Wind Tunnel, the 8-foot High-Temperature Tunnel and the 9- x 6-Foot Thermal Structures Tunnel.

  8. Cloudnet Project

    DOE Data Explorer

    Hogan, Robin

    2008-01-15

    Cloudnet is a research project supported by the European Commission. This project aims to use data obtained quasi-continuously for the development and implementation of cloud remote sensing synergy algorithms. The use of active instruments (lidar and radar) results in detailed vertical profiles of important cloud parameters which cannot be derived from current satellite sensing techniques. A network of three already existing cloud remote sensing stations (CRS-stations) will be operated for a two year period, activities will be co-ordinated, data formats harmonised and analysis of the data performed to evaluate the representation of clouds in four major european weather forecast models.

  9. LLAMA Project

    NASA Astrophysics Data System (ADS)

    Arnal, E. M.; Abraham, Z.; Giménez de Castro, G.; de Gouveia dal Pino, E. M.; Larrarte, J. J.; Lepine, J.; Morras, R.; Viramonte, J.

    2014-10-01

    The project LLAMA, acronym of Long Latin American Millimetre Array is very briefly described in this paper. This project is a joint scientific and technological undertaking of Argentina and Brazil on the basis of an equal investment share, whose mail goal is both to install and to operate an observing facility capable of exploring the Universe at millimetre and sub/millimetre wavelengths. This facility will be erected in the argentinean province of Salta, in a site located at 4830m above sea level.

  10. Spent Nuclear Fuel project, project management plan

    SciTech Connect

    Fuquay, B.J.

    1995-10-25

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  11. Project Documerica

    ERIC Educational Resources Information Center

    Journal of College Science Teaching, 1972

    1972-01-01

    The Environmental Protection Agency has started a project to actually picture the environmental movement in the United States. This is an attempt to make the public aware of the air pollution in their area or state and to acquaint them with the effects of air cleaning efforts. (PS)

  12. Project Schoolflight

    ERIC Educational Resources Information Center

    Owen, Ben

    1975-01-01

    Describes "Project School Flight" which is an idea originated by the Experimental Aircraft Association to provide the opportunity for young people to construct a light aircraft in the schools as part of a normal class. Address included of Experimental Aircraft Association for interested persons. (BR)

  13. Project CLASS.

    ERIC Educational Resources Information Center

    McBain, Susan L.; And Others

    Project CLASS (Competency-Based Live-Ability Skills) uses a series of 60 modules to teach life survival skills to adults with low-level reading ability--especially Adult Basic Education/English as a Second Language students. Two versions of the modules have been developed: one for use with teacher-directed instruction and another for independent…

  14. Project Notes.

    ERIC Educational Resources Information Center

    School Science Review, 1979

    1979-01-01

    Listed are 32 biology A-level projects, categorized by organisms studied as follows: algae (1), bryophytes (1), angiosperms (14), fungi (1), flatworms (1), annelids (2), molluscs (1), crustaceans (2), insects (4), fish (2), mammals (1), humans (1); and one synecological study. (CS)

  15. Limnological Projects.

    ERIC Educational Resources Information Center

    Hambler, David J.; Dixon, Jean M.

    1982-01-01

    Describes collection of quantitative samples of microorganisms and accumulation of physical data from a pond over a year. Provides examples of how final-year degree students have used materials and data for ecological projects (involving mainly algae), including their results/conclusions. Also describes apparatus and reagents used in the student…

  16. Hydrosphere Project.

    DTIC Science & Technology

    This final report summarizes the seven foot Hydrosphere Project. During the course of this program, three Interim Reports were submitted. Interim...to the final assembly of the seven foot Hydrosphere . This final report includes a brief outline of each of the above noted Interim Reports, as well as

  17. Project CAST.

    ERIC Educational Resources Information Center

    Charles County Board of Education, La Plata, MD. Office of Special Education.

    The document outlines procedures for implementing Project CAST (Community and School Together), a community-based career education program for secondary special education students in Charles County, Maryland. Initial sections discuss the role of a learning coordinator, (including relevant travel reimbursement and mileage forms) and an overview of…

  18. Project Choice.

    ERIC Educational Resources Information Center

    Ewing Marion Kauffman Foundation, Kansas City, MO.

    Project Choice was begun with the goal of increasing the number of inner-city students who graduate on time. Ewing M. Kauffman and his business and foundation associates designed and elected to test a model that used the promise of postsecondary education or training as the incentive to stay in school. This report details the evolution of Project…

  19. Thanksgiving Project

    ERIC Educational Resources Information Center

    Hilden, Pauline

    1976-01-01

    A teacher describes a Thanksgiving project in which 40 educable mentally retarded students (6-13 years old) made and served their own dinner of stew, butter, bread, ice cream, and pie, and in the process learned about social studies, cooking, and proper meal behavior. (CL)

  20. Project Boomerang

    ERIC Educational Resources Information Center

    King, Allen L.

    1975-01-01

    Describes an experimental project on boomerangs designed for an undergraduate course in classical mechanics. The students designed and made their own boomerangs, devised their own procedures, and carried out suitable measurements. Presents some of their data and a simple analysis for the two-bladed boomerang. (Author/MLH)

  1. Project ENRICH.

    ERIC Educational Resources Information Center

    Gwaley, Elizabeth; And Others

    Project ENRICH was conceived in Beaver County, Pennsylvania, to: (1) identify preschool children with learning disabilities, and (2) to develop a program geared to the remediation of the learning disabilities within a school year, while allowing the child to be enrolled in a regular class situation for the following school year. Through…

  2. Project Succeed.

    ERIC Educational Resources Information Center

    Patterson, John

    Project Succeed is a program for helping failure- and dropout-oriented pupils to improve their school achievement. Attendance and assignment completion are the key behaviors for enhancing achievement. Behavior modification and communications procedures are used to bring about the desired changes. Treatment procedures include current assessment…

  3. Project Reconstruct.

    ERIC Educational Resources Information Center

    Helisek, Harriet; Pratt, Donald

    1994-01-01

    Presents a project in which students monitor their use of trash, input and analyze information via a database and computerized graphs, and "reconstruct" extinct or endangered animals from recyclable materials. The activity was done with second-grade students over a period of three to four weeks. (PR)

  4. Project Narrative

    SciTech Connect

    Driscoll, Mary C.

    2012-07-12

    The Project Narrative describes how the funds from the DOE grant were used to purchase equipment for the biology, chemistry, physics and mathematics departments. The Narrative also describes how the equipment is being used. There is also a list of the positive outcomes as a result of having the equipment that was purchased with the DOE grant.

  5. Project Notes

    ERIC Educational Resources Information Center

    School Science Review, 1977

    1977-01-01

    Listed and described are student A-level biology projects in the following areas: Angiosperm studies (e.g., factors affecting growth of various plants), 7; Bacterial studies, 1; Insect studies, 2; Fish studies, 1; Mammal studies, 1; Human studies, 1; Synecology studies, 2; Environmental studies, 2; and Enzyme studies, 1. (CS)

  6. Cognitive Education Project. Summary Project.

    ERIC Educational Resources Information Center

    Mulcahy, Robert; And Others

    The Cognitive Education Project conducted a 3-year longitudinal evaluation of two cognitive education programs that were aimed at teaching thinking skills. The critical difference between the two experimental programs was that one, Feuerstein's Instrumental Enrichment (IE) method, was taught out of curricular content, while the other, the…

  7. Project Prometheus

    NASA Technical Reports Server (NTRS)

    Johnson, Steve

    2003-01-01

    Project Prometheus will enable a new paradigm in the scientific exploration of the Solar System. The proposed JIMO mission will start a new generation of missions characterized by more maneuverability, flexibility, power and lifetime. Project Prometheus organization is established at NASA Headquarters: 1.Organization established to carry out development of JIMO, nuclear power (radioisotope), and nuclear propulsion research. 2.Completed broad technology and national capacity assessments to inform decision making on planning and technology development. 3.Awarded five NRA s for nuclear propulsion research. 4.Radioisotope power systems in development, and Plutonium-238 being purchased from Russia. 5.Formulated science driven near-term and long-term plan for the safe utilization of nuclear propulsion based missions. 6.Completed preliminary studies (Pre-Phase A) of JIMO and other missions. 7.Initiated JIMO Phase A studies by Contractors and NASA.

  8. Project summaries

    NASA Technical Reports Server (NTRS)

    1990-01-01

    Lunar base projects, including a reconfigurable lunar cargo launcher, a thermal and micrometeorite protection system, a versatile lifting machine with robotic capabilities, a cargo transport system, the design of a road construction system for a lunar base, and the design of a device for removing lunar dust from material surfaces, are discussed. The emphasis on the Gulf of Mexico project was on the development of a computer simulation model for predicting vessel station keeping requirements. An existing code, used in predicting station keeping requirements for oil drilling platforms operating in North Shore (Alaska) waters was used as a basis for the computer simulation. Modifications were made to the existing code. The input into the model consists of satellite altimeter readings and water velocity readings from buoys stationed in the Gulf of Mexico. The satellite data consists of altimeter readings (wave height) taken during the spring of 1989. The simulation model predicts water velocity and direction, and wind velocity.

  9. Hydropower Projects

    SciTech Connect

    2015-04-02

    The Water Power Program helps industry harness this renewable, emissions-free resource to generate environmentally sustainable and cost-effective electricity. Through support for public, private, and nonprofit efforts, the Water Power Program promotes the development, demonstration, and deployment of advanced hydropower devices and pumped storage hydropower applications. These technologies help capture energy stored by diversionary structures, increase the efficiency of hydroelectric generation, and use excess grid energy to replenish storage reserves for use during periods of peak electricity demand. In addition, the Water Power Program works to assess the potential extractable energy from domestic water resources to assist industry and government in planning for our nation’s energy future. From FY 2008 to FY 2014, DOE’s Water Power Program announced awards totaling approximately $62.5 million to 33 projects focused on hydropower. Table 1 provides a brief description of these projects.

  10. SIMBIOS Project

    NASA Technical Reports Server (NTRS)

    Fargion, Giulietta S.; McClain, Charles R.; Busalacchi, Antonio J. (Technical Monitor)

    2001-01-01

    The purpose of this technical report is to provide current documentation of the Sensor Intercomparison and Merger for Biological and Interdisciplinary Oceanic Studies (SIMBIOS) Project activities, NASA Research Announcement (NRAI) research status, satellite data processing, data product validation, and field calibration. This documentation is necessary to ensure that critical information is related to the scientific community and NASA management. This critical information includes the technical difficulties and challenges of validating and combining ocean color data from an array of independent satellite systems to form consistent and accurate global bio-optical time series products. This technical report is not meant as a substitute for scientific literature. Instead, it will provide a ready and responsive vehicle for the multitude of technical reports issued by an operational project.

  11. Project MEDSAT

    NASA Astrophysics Data System (ADS)

    During the winter term of 1991, two design courses at the University of Michigan worked on a joint project, MEDSAT. The two design teams consisted of the Atmospheric, Oceanic, and Spacite System Design and Aerospace Engineering 483 (Aero 483) Aerospace System Design. In collaboration, they worked to produce MEDSAT, a satellite and scientific payload whose purpose was to monitor environmental conditions over Chiapas, Mexico. Information gained from the sensing, combined with regional data, would be used to determine the potential for malaria occurrence in that area. The responsibilities of AOSS 605 consisted of determining the remote sensing techniques, the data processing, and the method to translate the information into a usable output. Aero 483 developed the satellite configuration and the subsystems required for the satellite to accomplish its task. The MEDSAT project is an outgrowth of work already being accomplished by NASA's Biospheric and Disease Monitoring Program and Ames Research Center. NASA's work has been to develop remote sensing techniques to determine the abundance of disease carriers and now this project will place the techniques aboard a satellite. MEDSAT will be unique in its use of both a Synthetic Aperture Radar and visual/IR sensor to obtain comprehensive monitoring of the site. In order to create a highly feasible system, low cost was a high priority. To obtain this goal, a light satellite configuration launched by the Pegasus launch vehicle was used.

  12. Project MEDSAT

    NASA Technical Reports Server (NTRS)

    1991-01-01

    During the winter term of 1991, two design courses at the University of Michigan worked on a joint project, MEDSAT. The two design teams consisted of the Atmospheric, Oceanic, and Spacite System Design and Aerospace Engineering 483 (Aero 483) Aerospace System Design. In collaboration, they worked to produce MEDSAT, a satellite and scientific payload whose purpose was to monitor environmental conditions over Chiapas, Mexico. Information gained from the sensing, combined with regional data, would be used to determine the potential for malaria occurrence in that area. The responsibilities of AOSS 605 consisted of determining the remote sensing techniques, the data processing, and the method to translate the information into a usable output. Aero 483 developed the satellite configuration and the subsystems required for the satellite to accomplish its task. The MEDSAT project is an outgrowth of work already being accomplished by NASA's Biospheric and Disease Monitoring Program and Ames Research Center. NASA's work has been to develop remote sensing techniques to determine the abundance of disease carriers and now this project will place the techniques aboard a satellite. MEDSAT will be unique in its use of both a Synthetic Aperture Radar and visual/IR sensor to obtain comprehensive monitoring of the site. In order to create a highly feasible system, low cost was a high priority. To obtain this goal, a light satellite configuration launched by the Pegasus launch vehicle was used.

  13. HVCM Topology Enhancements to Support a Power Upgrade Required by a Second Target Station (STS) at SNS

    SciTech Connect

    Solley, Dennis J; Anderson, David E; Patel, Gunjan P; Peplov, Vladimir V; Saethre, Robert B; Wezensky, Mark W

    2012-01-01

    This paper discusses the topology used in the HVCMs at SNS to process power for both the cold and warm linac sections of the klystron gallery in support of extended operations at the megawatt level. In anticipation of a second target station and higher anticipated power levels, an enhancement to the present topology is being investigated. SPICE circuit simulations and preliminary experimental data will be presented.

  14. Project Exodus

    NASA Technical Reports Server (NTRS)

    1990-01-01

    Project Exodus is an in-depth study to identify and address the basic problems of a manned mission to Mars. The most important problems concern propulsion, life support, structure, trajectory, and finance. Exodus will employ a passenger ship, cargo ship, and landing craft for the journey to Mars. These three major components of the mission design are discussed separately. Within each component the design characteristics of structures, trajectory, and propulsion are addressed. The design characteristics of life support are mentioned only in those sections requiring it.

  15. SIMBIOS Project

    NASA Technical Reports Server (NTRS)

    Fargion, Giulietta S.; McClain, Charles R.

    2002-01-01

    The purpose of this technical report is to provide current documentation of the Sensor Intercomparison and Merger for Biological and Interdisciplinary Oceanic Studies (SIMBIOS) Project activities, NASA Research Announcement (NRA) research status, satellite data processing, data product validation, and field calibration. This documentation is necessary to ensure that critical information is related to the scientific community and NASA management. This critical information includes the technical difficulties and challenges of validating and combining ocean color data from an array of independent satellite systems to form consistent and accurate global bio-optical time series products. This technical report is not meant as a substitute for scientific literature. Instead, it will provide a ready and responsive vehicle for the multitude of technical reports issued by an operational project. The SIMBIOS Science Team Principal Investigators' (PIs) original contributions to this report are in chapters four and above. The purpose of these contributions is to describe the current research status of the SIMBIOS-NRA-96 funded research. The contributions are published as submitted, with the exception of minor edits to correct obvious grammatical or clerical errors.

  16. Project Exodus

    NASA Technical Reports Server (NTRS)

    Bryant, Rodney (Compiler); Dillon, Jennifer (Compiler); Grewe, George (Compiler); Mcmorrow, Jim (Compiler); Melton, Craig (Compiler); Rainey, Gerald (Compiler); Rinko, John (Compiler); Singh, David (Compiler); Yen, Tzu-Liang (Compiler)

    1990-01-01

    A design for a manned Mars mission, PROJECT EXODUS is presented. PROJECT EXODUS incorporates the design of a hypersonic waverider, cargo ship and NIMF (nuclear rocket using indigenous Martian fuel) shuttle lander to safely carry out a three to five month mission on the surface of Mars. The cargo ship transports return fuel, return engine, surface life support, NIMF shuttle, and the Mars base to low Mars orbit (LMO). The cargo ship is powered by a nuclear electric propulsion (NEP) system which allows the cargo ship to execute a spiral trajectory to Mars. The waverider transports ten astronauts to Mars and back. It is launched from the Space Station with propulsion provided by a chemical engine and a delta velocity of 9 km/sec. The waverider performs an aero-gravity assist maneuver through the atmosphere of Venus to obtain a deflection angle and increase in delta velocity. Once the waverider and cargo ship have docked the astronauts will detach the landing cargo capsules and nuclear electric power plant and remotely pilot them to the surface. They will then descend to the surface aboard the NIMF shuttle. A dome base will be quickly constructed on the surface and the astronauts will conduct an exploratory mission for three to five months. They will return to Earth and dock with the Space Station using the waverider.

  17. Project Explorer

    NASA Technical Reports Server (NTRS)

    Dannenberg, K. K.; Henderson, A.; Lee, J.; Smith, G.; Stluka, E.

    1984-01-01

    PROJECT EXPLORER is a program that will fly student-developed experiments onboard the Space Shuttle in NASA's Get-Away Special (GAS) containers. The program is co-sponsored by the Alabama Space and Rocket Center, the Alabama-Mississippi Section of the American Institute of Aeronautics and Astronautics, Alabama A&M University and requires extensive support by the University of Alabama in Huntsville. A unique feature of this project will demonstrate transmissions to ground stations on amateur radio frequencies in English language. Experiments Nos. 1, 2, and 3 use the microgravity of space flight to study the solidification of lead-antimony and aluminum-copper alloys, the growth of potassium-tetracyanoplatinate hydrate crystals in an aqueous solution, and the germination of radish seeds. Flight results will be compared with Earth-based data. Experiment No. 4 features radio transmission and will also provide timing for the start of all other experiments. A microprocessor will obtain real-time data from all experiments as well as temperature and pressure measurements taken inside the canister. These data will be transmitted on previously announced amateur radio frequencies after they have been converted into the English language by a digitalker for general reception.

  18. PORTNUS Project

    SciTech Connect

    Loyal, Rebecca E.

    2015-07-14

    The objective of the Portunus Project is to create large, automated offshore ports that will the pace and scale of international trade. Additionally, these ports would increase the number of U.S. domestic trade vessels needed, as the imported goods would need to be transported from these offshore platforms to land-based ports such as Boston, Los Angeles, and Newark. Currently, domestic trade in the United States can only be conducted by vessels that abide by the Merchant Marine Act of 1920 – also referred to as the Jones Act. The Jones Act stipulates that vessels involved in domestic trade must be U.S. owned, U.S. built, and manned by a crew made up of U.S. citizens. The Portunus Project would increase the number of Jones Act vessels needed, which raises an interesting economic concern. Are Jones Act ships more expensive to operate than foreign vessels? Would it be more economically efficient to modify the Jones Act and allow vessels manned by foreign crews to engage in U.S. domestic trade? While opposition to altering the Jones Act is strong, it is important to consider the possibility that ship-owners who employ foreign crews will lobby for the chance to enter a growing domestic trade market. Their success would mean potential job loss for thousands of Americans currently employed in maritime trade.

  19. SISCAL project

    NASA Astrophysics Data System (ADS)

    Santer, Richard P.; Fell, Frank

    2003-05-01

    The first "ocean colour" sensor, Coastal Zone Color Scanner (CZCS), was launched in 1978. Oceanographers learnt a lot from CZCS but it remained a purely scientific sensor. In recent years, a new generation of satellite-borne earth observation (EO) instruments has been brought into space. These instruments combine high spectral and spatial resolution with revisiting rates of the order of one per day. More instruments with further increased spatial, spectral and temporal resolution will be available within the next years. In the meantime, evaluation procedures taking advantage of the capabilities of the new instruments were derived, allowing the retrieval of ecologically important parameters with higher accuracy than before. Space agencies are now able to collect and to process satellite data in real time and to disseminate them via the Internet. It is therefore meanwhile possible to envisage using EO operationally. In principle, a significant demand for EO data products on terrestrial or marine ecosystems exists both with public authorities (environmental protection, emergency management, natural resources management, national parks, regional planning, etc) and private companies (tourist industry, insurance companies, water suppliers, etc). However, for a number of reasons, many data products that can be derived from the new instruments and methods have not yet left the scientific community towards public or private end users. It is the intention of the proposed SISCAL (Satellite-based Information System on Coastal Areas and Lakes) project to contribute to the closure of the existing gap between space agencies and research institutions on one side and end users on the other side. To do so, we intend to create a data processor that automatically derives and subsequently delivers over the Internet, in Near-Real-Time (NRT), a number of data products tailored to individual end user needs. The data products will be generated using a Geographical Information System (GIS

  20. Past Project Expo Sites

    EPA Pesticide Factsheets

    This page provides information for Project Expo sites that were featured at the LMOP Conferences in 2013 and 2014. Project Expo sites were featured as being interested in identifying project partners for the development of an LFG energy project.

  1. Project Grandmaster

    SciTech Connect

    2013-09-16

    The purpose of the Project Grandmaster Application is to allow individuals to opt-in and give the application access to data sources about their activities on social media sites. The application will cross-reference these data sources to build up a picture of each individual activities they discuss, either at present or in the past, and place this picture in reference to groups of all participants. The goal is to allow an individual to place themselves in the collective and to understand how their behavior patterns fit with the group and potentially find changes to make, such as activities they weren’t already aware of or different groups of interest they might want to follow.

  2. VIPER project

    NASA Technical Reports Server (NTRS)

    Kershaw, John

    1990-01-01

    The VIPER project has so far produced a formal specification of a 32 bit RISC microprocessor, an implementation of that chip in radiation-hard SOS technology, a partial proof of correctness of the implementation which is still being extended, and a large body of supporting software. The time has now come to consider what has been achieved and what directions should be pursued in the future. The most obvious lesson from the VIPER project was the time and effort needed to use formal methods properly. Most of the problems arose in the interfaces between different formalisms, e.g., between the (informal) English description and the HOL spec, between the block-level spec in HOL and the equivalent in ELLA needed by the low-level CAD tools. These interfaces need to be made rigorous or (better) eliminated. VIPER 1A (the latest chip) is designed to operate in pairs, to give protection against breakdowns in service as well as design faults. We have come to regard redundancy and formal design methods as complementary, the one to guard against normal component failures and the other to provide insurance against the risk of the common-cause failures which bedevil reliability predictions. Any future VIPER chips will certainly need improved performance to keep up with increasingly demanding applications. We have a prototype design (not yet specified formally) which includes 32 and 64 bit multiply, instruction pre-fetch, more efficient interface timing, and a new instruction to allow a quick response to peripheral requests. Work is under way to specify this device in MIRANDA, and then to refine the spec into a block-level design by top-down transformations. When the refinement is complete, a relatively simple proof checker should be able to demonstrate its correctness. This paper is presented in viewgraph form.

  3. Ace Project as a Project Management Tool

    ERIC Educational Resources Information Center

    Cline, Melinda; Guynes, Carl S.; Simard, Karine

    2010-01-01

    The primary challenge of project management is to achieve the project goals and objectives while adhering to project constraints--usually scope, quality, time and budget. The secondary challenge is to optimize the allocation and integration of resources necessary to meet pre-defined objectives. Project management software provides an active…

  4. Project Success in Agile Development Software Projects

    ERIC Educational Resources Information Center

    Farlik, John T.

    2016-01-01

    Project success has multiple definitions in the scholarly literature. Research has shown that some scholars and practitioners define project success as the completion of a project within schedule and within budget. Others consider a successful project as one in which the customer is satisfied with the product. This quantitative study was conducted…

  5. Project Information Packages Kit.

    ERIC Educational Resources Information Center

    RMC Research Corp., Mountain View, CA.

    Presented are an overview booklet, a project selection guide, and six Project Information Packages (PIPs) for six exemplary projects serving underachieving students in grades k through 9. The overview booklet outlines the PIP projects and includes a chart of major project features. A project selection guide reviews the PIP history, PIP contents,…

  6. Project LASER

    NASA Technical Reports Server (NTRS)

    1990-01-01

    NASA formally launched Project LASER (Learning About Science, Engineering and Research) in March 1990, a program designed to help teachers improve science and mathematics education and to provide 'hands on' experiences. It featured the first LASER Mobile Teacher Resource Center (MTRC), is designed to reach educators all over the nation. NASA hopes to operate several MTRCs with funds provided by private industry. The mobile unit is a 22-ton tractor-trailer stocked with NASA educational publications and outfitted with six work stations. Each work station, which can accommodate two teachers at a time, has a computer providing access to NASA Spacelink. Each also has video recorders and photocopy/photographic equipment for the teacher's use. MTRC is only one of the five major elements within LASER. The others are: a Space Technology Course, to promote integration of space science studies with traditional courses; the Volunteer Databank, in which NASA employees are encouraged to volunteer as tutors, instructors, etc; Mobile Discovery Laboratories that will carry simple laboratory equipment and computers to provide hands-on activities for students and demonstrations of classroom activities for teachers; and the Public Library Science Program which will present library based science and math programs.

  7. RESOLVE Project

    NASA Technical Reports Server (NTRS)

    Parker, Ray; Coan, Mary; Cryderman, Kate; Captain, Janine

    2013-01-01

    The RESOLVE project is a lunar prospecting mission whose primary goal is to characterize water and other volatiles in lunar regolith. The Lunar Advanced Volatiles Analysis (LAVA) subsystem is comprised of a fluid subsystem that transports flow to the gas chromatograph - mass spectrometer (GC-MS) instruments that characterize volatiles and the Water Droplet Demonstration (WDD) that will capture and display water condensation in the gas stream. The LAVA Engineering Test Unit (ETU) is undergoing risk reduction testing this summer and fall within a vacuum chamber to understand and characterize component and integrated system performance. Testing of line heaters, printed circuit heaters, pressure transducers, temperature sensors, regulators, and valves in atmospheric and vacuum environments was done. Test procedures were developed to guide experimental tests and test reports to analyze and draw conclusions from the data. In addition, knowledge and experience was gained with preparing a vacuum chamber with fluid and electrical connections. Further testing will include integrated testing of the fluid subsystem with the gas supply system, near-infrared spectrometer, WDD, Sample Delivery System, and GC-MS in the vacuum chamber. This testing will provide hands-on exposure to a flight forward spaceflight subsystem, the processes associated with testing equipment in a vacuum chamber, and experience working in a laboratory setting. Examples of specific analysis conducted include: pneumatic analysis to calculate the WDD's efficiency at extracting water vapor from the gas stream to form condensation; thermal analysis of the conduction and radiation along a line connecting two thermal masses; and proportional-integral-derivative (PID) heater control analysis. Since LAVA is a scientific subsystem, the near-infrared spectrometer and GC-MS instruments will be tested during the ETU testing phase.

  8. RESOLVE Project

    NASA Technical Reports Server (NTRS)

    Parker, Ray O.

    2012-01-01

    The RESOLVE project is a lunar prospecting mission whose primary goal is to characterize water and other volatiles in lunar regolith. The Lunar Advanced Volatiles Analysis (LAVA) subsystem is comprised of a fluid subsystem that transports flow to the gas chromatograph- mass spectrometer (GC-MS) instruments that characterize volatiles and the Water Droplet Demonstration (WDD) that will capture and display water condensation in the gas stream. The LAVA Engineering Test Unit (ETU) is undergoing risk reduction testing this summer and fall within a vacuum chamber to understand and characterize C!Jmponent and integrated system performance. Ray will be assisting with component testing of line heaters, printed circuit heaters, pressure transducers, temperature sensors, regulators, and valves in atmospheric and vacuum environments. He will be developing procedures to guide these tests and test reports to analyze and draw conclusions from the data. In addition, he will gain experience with preparing a vacuum chamber with fluid and electrical connections. Further testing will include integrated testing of the fluid subsystem with the gas supply system, near-infrared spectrometer, WDD, Sample Delivery System, and GC-MS in the vacuum chamber. This testing will provide hands-on exposure to a flight forward spaceflight subsystem, the processes associated with testing equipment in a vacuum chamber, and experience working in a laboratory setting. Examples of specific analysis Ray will conduct include: pneumatic analysis to calculate the WOO's efficiency at extracting water vapor from the gas stream to form condensation; thermal analysis of the conduction and radiation along a line connecting two thermal masses; and proportional-integral-derivative (PID) heater control analysis. In this Research and Technology environment, Ray will be asked to problem solve real-time as issues arise. Since LAVA is a scientific subsystem, Ray will be utilizing his chemical engineering background to

  9. Project summary

    NASA Technical Reports Server (NTRS)

    1991-01-01

    California Polytechnic State University's design project for the 1990-91 school year was the design of a close air support aircraft. There were eight design groups that participated and were given requests for proposals. These proposals contained mission specifications, particular performance and payload requirements, as well as the main design drivers. The mission specifications called for a single pilot weighing 225 lb with equipment. The design mission profile consisted of the following: (1) warm-up, taxi, take off, and accelerate to cruise speed; (2) dash at sea level at 500 knots to a point 250 nmi from take off; (3) combat phase, requiring two combat passes at 450 knots that each consist of a 360 deg turn and an energy increase of 4000 ft. - at each pass, half of air-to-surface ordnance is released; (4) dash at sea level at 500 knots 250 nmi back to base; and (5) land with 20 min of reserve fuel. The request for proposal also specified the following performance requirements with 50 percent internal fuel and standard stores: (1) the aircraft must be able to accelerate from Mach 0.3 to 0.5 at sea level in less than 20 sec; (2) required turn rates are 4.5 sustained g at 450 knots at sea level; (3) the aircraft must have a reattack time of 25 sec or less (reattack time was defined as the time between the first and second weapon drops); (4) the aircraft is allowed a maximum take off and landing ground roll of 2000 ft. The payload requirements were 20 Mk 82 general-purpose free-fall bombs and racks; 1 GAU-8A 30-mm cannon with 1350 rounds; and 2 AIM-9L Sidewinder missiles and racks. The main design drivers expressed in the request for proposal were that the aircraft should be survivable and maintainable. It must be able to operate in remote areas with little or no maintenance. Simplicity was considered the most important factor in achieving the former goal. In addition, the aircraft must be low cost both in acquisition and operation. The summaries of the aircraft

  10. Managing Projects for Change: Contextualised Project Management

    ERIC Educational Resources Information Center

    Tynan, Belinda; Adlington, Rachael; Stewart, Cherry; Vale, Deborah; Sims, Rod; Shanahan, Peter

    2010-01-01

    This paper will detail three projects which focussed on enhancing online learning at a large Australian distance education University within a School of Business, School of Health and School of Education. Each project had special funding and took quite distinctive project management approaches, which reflect the desire to embed innovation and…

  11. Project Panama: An International Service Project

    ERIC Educational Resources Information Center

    Aydlett, Lydia; Randolph, Mickey; Wells, Gayle

    2010-01-01

    Participation in service learning projects is a growing phenomenon at universities and colleges. Research indicates service projects are beneficial for college students and adults. There is little data investigating developmental differences in how younger versus older participants perceive the service learning process. In this project, older…

  12. Elementary School Projects.

    ERIC Educational Resources Information Center

    Learning By Design, 2001

    2001-01-01

    Highlights elementary school construction projects that have won the Learning By Design Awards for 2001. Projects covered involve new school construction; and renovation, additions, and restoration. (GR)

  13. Project Lodestar Special Report.

    ERIC Educational Resources Information Center

    Brown, Peggy, Ed.

    1981-01-01

    The Association of American Colleges' (AAC) Project Lodestar is addressed in an article and descriptions of the pilot phase of the project at 13 institutions. In "Project Lodestar: Realistically Assessing the Future," Peggy Brown provides an overview of the project, which is designed to help colleges and universities in assessment of…

  14. Project Follow Through.

    ERIC Educational Resources Information Center

    Illinois State Office of the Superintendent of Public Instruction, Springfield. Dept. for Exceptional Children.

    The four Follow Through projects in Illinois are described and evaluated. These projects involve approximately 1,450 children in K-3 in Mounds, East Saint Louis, Waukegan, and Chicago. The Chicago project is subdivided into three individual projects and is trying three experimental programs. Emphasis is given to the nature of the environmental…

  15. Determinants of project success

    NASA Technical Reports Server (NTRS)

    Murphy, D. C.; Baker, B. N.; Fisher, D.

    1974-01-01

    The interactions of numerous project characteristics, with particular reference to project performance, were studied. Determinants of success are identified along with the accompanying implications for client organization, parent organization, project organization, and future research. Variables are selected which are found to have the greatest impact on project outcome, and the methodology and analytic techniques to be employed in identification of those variables are discussed.

  16. NCMS ESS 2000 Project

    NASA Technical Reports Server (NTRS)

    Gibbel, Mark; Bellamy, Marvin; DeSantis, Charlie; Hess, John; Pattok, Tracy; Quintero, Andrew; Silver, R.

    1996-01-01

    ESS 2000 has the vision of enhancing the knowledge necessary to implement cost-effective, leading-edge ESS technologies and procedures in order to increase U.S. electronics industry competitiveness. This paper defines EES and discusses the factors driving the project, the objectives of the project, its participants, the three phases of the project, the technologies involved, and project deliverables.

  17. eProject Builder

    SciTech Connect

    2014-06-01

    eProject Builder enables Energy Services Companies (ESCOs) and their contracting agencies to: 1. upload and track project-level Information 2. generate basic project reports required by local, state, and/or federal agencies 3. benchmark new Energy Savings Performance Contract (ESPC) projects against historical data

  18. Korea's School Grounds Projects

    ERIC Educational Resources Information Center

    Park, Joohun

    2003-01-01

    This article describes two projects which Korea has undertaken to improve its school grounds: (1) the Green School Project; and (2) the School Forest Pilot Project. The Korean Ministry of Education and Human Resources Development (MOE&HRI) recently launched the Green School Project centred on existing urban schools with poor outdoor…

  19. Earth System Science Project

    ERIC Educational Resources Information Center

    Rutherford, Sandra; Coffman, Margaret

    2004-01-01

    For several decades, science teachers have used bottles for classroom projects designed to teach students about biology. Bottle projects do not have to just focus on biology, however. These projects can also be used to engage students in Earth science topics. This article describes the Earth System Science Project, which was adapted and developed…

  20. Guidelines for Project Management

    NASA Technical Reports Server (NTRS)

    Ben-Arieh, David

    2001-01-01

    Project management is an important part of the professional activities at Kennedy Space Center (KSC). Project management is the means by which many of the operations at KSC take shape. Moreover, projects at KSC are implemented in a variety of ways in different organizations. The official guidelines for project management are provided by NASA headquarters and are quite general. The project reported herein deals with developing practical and detailed project management guidelines in support of the project managers. This report summarizes the current project management effort in the Process Management Division and presents a new modeling approach of project management developed by the author. The report also presents the Project Management Guidelines developed during the summer.

  1. Breuner Marsh Restoration Project

    EPA Pesticide Factsheets

    Information about the San Francisco Bay Water Quality Project (SFBWQP) Breuner Marsh Restoration Project, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.

  2. CHP Project Development

    EPA Pesticide Factsheets

    Access information and tools to support the CHP project development process, including identifying if your facility is a good fit for CHP, the steps involved with CHP project development, and policies and incentives supportive of CHP.

  3. Project Matching Initiative

    EPA Pesticide Factsheets

    The Green Power Partnership's Project Matching initiative works to connect green power users with new, not-yet-built renewable energy projects that may align with their energy, environmental, and financial objectives.

  4. The Alzheimer's Project

    MedlinePlus

    ... Navigation Bar Home Current Issue Past Issues The Alzheimer's Project Past Issues / Spring 2009 Table of Contents ... of this page please turn Javascript on. The Alzheimer's Project A 4-Part Documentary Series Starting May ...

  5. Venezuela's Bolivarian Schools Project.

    ERIC Educational Resources Information Center

    Diaz, Maria Magnolia Santamaria

    2002-01-01

    Discusses efforts by the Venezuelan government to improve the nation's school infrastructure through the Bolivarian Schools Project administered by the Ministry of Education, Culture and Sport. The project set educational principles which are guiding current school building efforts. (EV)

  6. Project ArchimedeZ

    DTIC Science & Technology

    2015-05-18

    Project ArchimedeZ Think Tank Group # 1 SOS 15D 18 May 2015 Maj Chanel Burnell Capt Thomas Bryant Capt Andrew Chema Capt Richard... Project ArchimedeZ 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT...challenge, Think Tank Group 1 developed Project ArchimedeZ, an incentive-focused, learner-centric construct that utilizes existing distant learning resources

  7. GHPsRUS Project

    SciTech Connect

    Battocletti, Liz

    2013-07-09

    The GHPsRUS Project's full name is "Measuring the Costs and Benefits of Nationwide Geothermal Heat Pump Deployment." The dataset contains employment and installation price data collected by four economic surveys: (1)GHPsRUS Project Manufacturer & OEM Survey, (2) GHPsRUS Project Geothermal Loop Survey, (3) GHPsRUS Project Mechanical Equipment Installation Survey, and (4) GHPsRUS Geothermal Heat Pump Industry Survey

  8. Kansas Advanced Semiconductor Project

    SciTech Connect

    Baringer, P.; Bean, A.; Bolton, T.; Horton-Smith, G.; Maravin, Y.; Ratra, B.; Stanton, N.; von Toerne, E.; Wilson, G.

    2007-09-21

    KASP (Kansas Advanced Semiconductor Project) completed the new Layer 0 upgrade for D0, assumed key electronics projects for the US CMS project, finished important new physics measurements with the D0 experiment at Fermilab, made substantial contributions to detector studies for the proposed e+e- international linear collider (ILC), and advanced key initiatives in non-accelerator-based neutrino physics.

  9. THE ATLANTA SUPERSITE PROJECT

    EPA Science Inventory

    The Atlanta Supersites project is the first of two Supersites projects to be established during Phase I of EPA's Supersites Program; Phase 11 is being established through a Request for Assistance. The other initial project is in Fresno, California. The Supersites Program is par...

  10. Projection: A Bibliography.

    ERIC Educational Resources Information Center

    Pedrini, D. T.; Pedrini, Bonnie C.

    Sigmund Freud and his associates did much clinical work with the dynamic of projection, especially with regard to paranoid symptoms and syndromes. Much experimental work has also been done with projection. Sears evaluated the results of some of those studies. Murstein and Pryer sub-classified projection and reviewed typical studies. The…

  11. The Eggen Card Project

    NASA Astrophysics Data System (ADS)

    Silvis, G.

    2014-06-01

    (Abstract only) Olin Eggen, noted astronomer (1919-1998), left to us all his raw observation records recorded on 3x5 cards. This project is to make all this data available as an online resource. History and progress of the project will be presented. Project details available at: https://sites.google.com/site/eggencards/home.

  12. System Alternatives Project

    ERIC Educational Resources Information Center

    Petrait, James A.

    1977-01-01

    The Systems Alternatives Project is an attempt to develop open classroom alternatives within a modular scheduling system. Biology students are given both action and test objectives that emphasize individualization. Structure of the project is detailed and an attempt to analyze the project evaluation data statistically is included. (MA)

  13. The Sidewalk Project

    ERIC Educational Resources Information Center

    Church, William

    2005-01-01

    In this article, the author features "the sidewalk project" in Littleton High School. The sidewalk project is a collaboration of more than 40 high school physics students, 10 local mentors, and a few regional and national organizations who worked together to invent a way to heat a sidewalk with an alternative energy source. The project, which…

  14. Humane Education Projects Handbook.

    ERIC Educational Resources Information Center

    Junior League of Ogden, UT.

    This handbook was developed to promote interest in humane education and to encourage the adoption of humane education projects. Although specifically designed to assist Junior Leagues in developing such projects, the content should prove valuable to animal welfare organizations, zoos, aquariums, nature centers, and other project-oriented groups…

  15. Projects in History

    ERIC Educational Resources Information Center

    Harben, Cedric Y.

    1974-01-01

    Discusses two types of historical projects conducted by O-level pupils at Clifton College: studies of famous chemists and projects on the development of industrial chemicals. Indicates that a project in the history of chemistry is characterized by its practical and philosophical approach to chemistry study. (CC)

  16. The Llama Project.

    ERIC Educational Resources Information Center

    Ganzel, Candy; Stuglik, Jan

    2003-01-01

    At a suburban Indiana elementary school, the Project Approach serves as the basis of the curriculum in all Kindergarten classrooms. The four classes of 5- and 6-year-old children at this school chose to study llamas. This article discusses how the project evolved, describes the three phases of the project, and provides teachers' reflections on the…

  17. Little River Project.

    ERIC Educational Resources Information Center

    Naisbitt, Ian

    1995-01-01

    Describes the adoption of an old riverside landfill by an elementary school as a Habitat 2000 community project. Contains a "how-to" checklist for such a project, information on building school-community community partnerships, and promotional ideas for stewardship projects. (LZ)

  18. Underestimation of Project Costs

    NASA Technical Reports Server (NTRS)

    Jones, Harry W.

    2015-01-01

    Large projects almost always exceed their budgets. Estimating cost is difficult and estimated costs are usually too low. Three different reasons are suggested: bad luck, overoptimism, and deliberate underestimation. Project management can usually point to project difficulty and complexity, technical uncertainty, stakeholder conflicts, scope changes, unforeseen events, and other not really unpredictable bad luck. Project planning is usually over-optimistic, so the likelihood and impact of bad luck is systematically underestimated. Project plans reflect optimism and hope for success in a supposedly unique new effort rather than rational expectations based on historical data. Past project problems are claimed to be irrelevant because "This time it's different." Some bad luck is inevitable and reasonable optimism is understandable, but deliberate deception must be condemned. In a competitive environment, project planners and advocates often deliberately underestimate costs to help gain project approval and funding. Project benefits, cost savings, and probability of success are exaggerated and key risks ignored. Project advocates have incentives to distort information and conceal difficulties from project approvers. One naively suggested cure is more openness, honesty, and group adherence to shared overall goals. A more realistic alternative is threatening overrun projects with cancellation. Neither approach seems to solve the problem. A better method to avoid the delusions of over-optimism and the deceptions of biased advocacy is to base the project cost estimate on the actual costs of a large group of similar projects. Over optimism and deception can continue beyond the planning phase and into project execution. Hard milestones based on verified tests and demonstrations can provide a reality check.

  19. Managing Projects with KPRO

    NASA Technical Reports Server (NTRS)

    Braden, Barry M.

    2004-01-01

    How does a Project Management Office provide: Consistent, familiar, easily used scheduling tools to Project Managers and project team members? Provide a complete list of organization resources available for use on the project? Facilitate resource tracking and visibility? Provide the myriad reports that the organization requires? Facilitate consistent budget planning and cost performance information? Provide all of this to the entire organization? Provide for the unique requirement of the organization? and get people to use it? Answer: Implementation of the Kennedy space Center Projects and Resources Online (KPRO), a modified COTS solution.

  20. Comparing project investments

    SciTech Connect

    Wirasinghe, E.

    1988-06-01

    HPI managers are often faced with the nightmare of deciding on which projects to invest their limited capital. There usually are more potential projects than money available for investment. A typical strategy is in two parts: select a method to rank the projects; consider corporate policy to make a choice. This discussion highlights various ways to rank projects. After a discussion of some ranking methods, three cases are presented where it appears the wrong project was selected - either because of incorrect advice or because data were intentionally manipulated.

  1. Adaptive Composite Map Projections.

    PubMed

    Jenny, B

    2012-12-01

    All major web mapping services use the web Mercator projection. This is a poor choice for maps of the entire globe or areas of the size of continents or larger countries because the Mercator projection shows medium and higher latitudes with extreme areal distortion and provides an erroneous impression of distances and relative areas. The web Mercator projection is also not able to show the entire globe, as polar latitudes cannot be mapped. When selecting an alternative projection for information visualization, rivaling factors have to be taken into account, such as map scale, the geographic area shown, the map's height-to-width ratio, and the type of cartographic visualization. It is impossible for a single map projection to meet the requirements for all these factors. The proposed composite map projection combines several projections that are recommended in cartographic literature and seamlessly morphs map space as the user changes map scale or the geographic region displayed. The composite projection adapts the map's geometry to scale, to the map's height-to-width ratio, and to the central latitude of the displayed area by replacing projections and adjusting their parameters. The composite projection shows the entire globe including poles; it portrays continents or larger countries with less distortion (optionally without areal distortion); and it can morph to the web Mercator projection for maps showing small regions.

  2. Quality Assurance Project Plan for Citizen Science Projects

    EPA Pesticide Factsheets

    The Quality Assurance Project Plan is necessary for every project that collects or uses environmental data. It documents the project planning process and serves as a blueprint for how your project will run.

  3. Environmental Science: 49 Science Fair Projects. Science Fair Projects Series.

    ERIC Educational Resources Information Center

    Bonnet, Robert L.; Keen, G. Daniel

    This book contains 49 science fair projects designed for 6th to 9th grade students. Projects are organized by the topics of soil, ecology (projects in habitat and life cycles), pests and controls (projects in weeds and insects), recycling (projects in resources and conservation), waste products (projects in decomposition), microscopic organisms,…

  4. Project Surveillance and Maintenance Plan. [UMTRA Project

    SciTech Connect

    Not Available

    1985-09-01

    The Project Surveillance and Maintenance Plan (PSMP) describes the procedures that will be used by the US Department of Energy (DOE), or other agency as designated by the President to verify that inactive uranium tailings disposal facilities remain in compliance with licensing requirements and US Environmental Protection Agency (EPA) standards for remedial actions. The PSMP will be used as a guide for the development of individual Site Surveillance and Maintenance Plans (part of a license application) for each of the UMTRA Project sites. The PSMP is not intended to provide minimum requirements but rather to provide guidance in the selection of surveillance measures. For example, the plan acknowledges that ground-water monitoring may or may not be required and provides the (guidance) to make this decision. The Site Surveillance and Maintenance Plans (SSMPs) will form the basis for the licensing of the long-term surveillance and maintenance of each UMTRA Project site by the NRC. Therefore, the PSMP is a key milestone in the licensing process of all UMTRA Project sites. The Project Licensing Plan (DOE, 1984a) describes the licensing process. 11 refs., 22 figs., 8 tabs.

  5. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    SciTech Connect

    Fix, N. J.

    2008-11-30

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  6. Project GlobWave

    NASA Astrophysics Data System (ADS)

    Busswell, Geoff; Ash, Ellis; Piolle, Jean-Francois; Poulter, David J. S.; Snaith, Helen; Collard, Fabrice; Sheera, Harjit; Pinnock, Simon

    2010-12-01

    The ESA GlobWave project is a three year initiative, funded by ESA and CNES, to service the needs of satellite wave product users across the globe. Led by Logica UK, with support from CLS, IFREMER, SatOC and NOCS, the project will provide free access to satellite wave data and products in a common format, both historical and in near real time, from various European and American SAR and altimeter missions. Building on the successes of similar projects for Sea Surface Temperature and ocean colour, the project aims to stimulate increased use and analysis of satellite wave products. In addition to common-format satellite data the project will provide comparisons with in situ measurements, interactive data analysis tools and a pilot spatial wave forecast verification scheme for operational forecast production centres. The project will begin operations in January 2010, with direction from regular structured user consultation.

  7. Battleground Energy Recovery Project

    SciTech Connect

    Bullock, Daniel

    2011-12-31

    In October 2009, the project partners began a 36-month effort to develop an innovative, commercial-scale demonstration project incorporating state-of-the-art waste heat recovery technology at Clean Harbors, Inc., a large hazardous waste incinerator site located in Deer Park, Texas. With financial support provided by the U.S. Department of Energy, the Battleground Energy Recovery Project was launched to advance waste heat recovery solutions into the hazardous waste incineration market, an area that has seen little adoption of heat recovery in the United States. The goal of the project was to accelerate the use of energy-efficient, waste heat recovery technology as an alternative means to produce steam for industrial processes. The project had three main engineering and business objectives: Prove Feasibility of Waste Heat Recovery Technology at a Hazardous Waste Incinerator Complex; Provide Low-cost Steam to a Major Polypropylene Plant Using Waste Heat; and Create a Showcase Waste Heat Recovery Demonstration Project.

  8. Computer Assets Recovery Project

    NASA Technical Reports Server (NTRS)

    CortesPena, Aida Yoguely

    2010-01-01

    This document reports on the project that was performed during the internship of the author. The project involved locating and recovering machines in various locations that Boeing has no need for, and therefore requires that they be transferred to another user or transferred to a non-profit organization. Other projects that the author performed was an inventory of toner and printers, loading new computers and connecting them to the network.

  9. Operational waste volume projection

    SciTech Connect

    Koreski, G.M.; Strode, J.N.

    1995-06-01

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the tri-party agreement. Assumptions are current as of June 1995.

  10. Frequency Comb Cooling Project

    DTIC Science & Technology

    2014-03-18

    frequency combs ). Recently the power and spectral coverage of frequency combs have grown considerably with projected 1. REPORT DATE (DD-MM-YYYY) 4. TITLE...Aug-2011 18-May-2012 Approved for Public Release; Distribution Unlimited Final report on frequency comb cooling project The views, opinions and/or... frequency combs ). Recently the power and spectral coverage of frequency combs have grown considerably with projected average powers above 10 kW. We

  11. KSC History Project

    NASA Technical Reports Server (NTRS)

    Snaples, Lee

    2001-01-01

    The project is a joint endeavor between Dr. Henry Dethloff and myself and is producing a number of products related to KSC history. This report is a summary of those projects. First, there is an overview monograph covering KSC history. Second, there is a chapter outline for an eventual book-length history. Third, there is monograph on safety at KSC. Finally, there is a web page and database dedicated to the KSC oral history project.

  12. Project Risk Management

    NASA Technical Reports Server (NTRS)

    Jr., R. F. Miles

    1995-01-01

    Project risk management is primarily concerned with performance, reliability, cost, and schedule. Environmental risk management is primarily concerned with human health and ecological hazards and likelihoods. This paper discusses project risk management and compares it to environmental risk management, both with respect to goals and implementation. The approach of the Jet Propulsion Laboratory to risk management is presented as an example of a project risk management approach that is an extension to NASA NHB 7120.5: Management of Major System Programs and Projects.

  13. KSC History Project

    NASA Technical Reports Server (NTRS)

    Dethloff, Henry C.

    2001-01-01

    The KSC History Project focuses on archival research and oral history interviews on the history of Kennedy Space Center (KSC). Related projects include the preparation of a precis and chapter outline for a proposed book-length narrative history, a bibliography of key primary and secondary resources, a brief monograph overview of the history of KSC, and a monograph on the history of safety at the Center. Finally, there is work on the development of a web page and a personal history data base associated with the oral history project. The KSC History Project has been a joint endeavor between Henry C. Dethloff and Dr. Noble Lee Snaples, Jr.

  14. Other School Projects.

    ERIC Educational Resources Information Center

    Learning By Design, 2001

    2001-01-01

    Highlights selected construction projects for learning centers, early childhood and development schools, and special purpose educational facilities that have won the Learning By Design Awards for 2001.(GR)

  15. FLEXI Project Management Survey

    NASA Astrophysics Data System (ADS)

    Rohunen, Anna; Krzanik, Lech; Kuvaja, Pasi; Similä, Jouni; Rodriguez, Pilar; Hyysalo, Jarkko; Linna, Tommi

    FLEXI Project Management Survey (FLEXI PMS) has been established to gain detailed knowledge on how the software industry - in particular successful companies - manages agile software development. FLEXI PMS investigates the actual agile values, principles, practices and contexts. The survey is supported by a careful literature review and analysis of existing studies. Special attention is attached to large, multi-site, multi-company and distributed projects - the target area of FLEXI project. The survey is intended to provide solid data for further knowledge acquisition and project/company positioning with regard to feasible agile management practices.

  16. Project Worm Bin.

    ERIC Educational Resources Information Center

    McGuire, Daniel C.

    1987-01-01

    Describes a project centering around earthworm activity in a compost bin. Includes suggestions for exercises involving biological and conservation concepts, gardening skills, and dramatical presentations. (ML)

  17. Manpower and project planning

    NASA Technical Reports Server (NTRS)

    Johnson, David W.

    1991-01-01

    The purpose was to study how manpower and projects are planned at the Facilities Engineering Division (FENGD) within the Systems Engineering and Operations Directorate of the LaRC and to make recommendations for improving the effectiveness and productivity ot the tools that are used. The existing manpower and project planning processes (including the management plan for the FENGD, existing manpower planning reports, project reporting to LaRC and NASA Headquarters, employee time reporting, financial reporting, and coordination/tracking reports for procurement) were discussed with several people, and project planning software was evaluated.

  18. The Wedding Project: Introducing the Project Approach

    ERIC Educational Resources Information Center

    Sorrels, Barbara; Norris, Deborah; Sheeran, Linda

    2004-01-01

    Constructivist education, based on the theories of Piaget and Vygotsky, advocates an approach to curriculum and teaching that is student centered, inquiry based, integrated and intellectually engaging. One teaching strategy that provides such an experience is the Project Approach, reflective of the pedagogy of John Dewey and introduced as a model…

  19. Basalt Waste Isolation Project Reclamation Support Project:

    SciTech Connect

    Brandt, C.A.; Rickard, W.H. Jr.; Cadoret, N.A.

    1992-06-01

    The Basalt Waste Isolation Project (BWIP) Reclamation Support Project began in the spring of 1988 by categorizing sites distributed during operations of the BWIP into those requiring revegetation and those to be abandoned or transferred to other programs. The Pacific Northwest Laboratory's role in this project was to develop plans for reestablishing native vegetation on the first category of sites, to monitor the implementation of these plans, to evaluate the effectiveness of these efforts, and to identify remediation methods where necessary. The Reclamation Support Project focused on three major areas: geologic hydrologic boreholes, the Exploratory Shaft Facility (ESF), and the Near-Surface Test Facility (NSTF). A number of BWIP reclamation sites seeded between 1989 and 1990 were found to be far below reclamation objectives. These sites were remediated in 1991 using various seedbed treatments designed to rectify problems with water-holding capacity, herbicide activity, surficial crust formation, and nutrient imbalances. Remediation was conducted during November and early December 1991. Sites were examined on a monthly basis thereafter to evaluate plant growth responses to these treatments. At all remediation sites early plant growth responses to these treatments. At all remediation sites, early plant growth far exceeded any previously obtained using other methods and seedbed treatments. Seeded plants did best where amendments consisted of soil-plus-compost or fertilizer-only. Vegetation growth on Gable Mountain was less than that found on other areas nearby, but this difference is attributed primarily to the site's altitude and north-facing orientation.

  20. River Protection Project (RPP) Project Management Plan

    SciTech Connect

    NAVARRO, J.E.

    2001-03-07

    The Office of River Protection (ORP) Project Management Plan (PMP) for the River Protection Project (RPP) describes the process for developing and operating a Waste Treatment Complex (WTC) to clean up Hanford Site tank waste. The Plan describes the scope of the project, the institutional setting within which the project must be completed, and the management processes and structure planned for implementation. The Plan is written from the perspective of the ORP as the taxpayers' representative. The Hanford Site, in southeastern Washington State, has one of the largest concentrations of radioactive waste in the world, as a result of producing plutonium for national defense for more than 40 years. Approximately 53 million gallons of waste stored in 177 aging underground tanks represent major environmental, social, and political challenges for the U.S. Department of Energy (DOE). These challenges require numerous interfaces with state and federal environmental officials, Tribal Nations, stakeholders, Congress, and the US Department of Energy-Headquarters (DOE-HQ). The cleanup of the Site's tank waste is a national issue with the potential for environmental and economic impacts to the region and the nation.

  1. Project New Pride: Replication.

    ERIC Educational Resources Information Center

    National Inst. for Juvenile Justice and Delinquency Prevention (Dept. of Justice/LEAA), Washington, DC.

    The Office of Juvenile Justice and Delinquency Prevention, Law Enforcement Assistance Administration, is establishing a new discretionary grant program entitled Replication of Project New Pride: A Serious Offender Youth Treatment Program. Project New Pride was chosen for replication because of its demonstrated effectiveness in Denver, Colorado,…

  2. Winnipeg Centre Project.

    ERIC Educational Resources Information Center

    Manitoba Dept. of Education, Winnipeg.

    The Winnipeg Centre Project is a field-based, work-study program that attempts to create more appropriate education for the inner-city child. Sponsored by the Planning and Research Branch of the Department of Colleges and Universities Affairs and administered by Brandon University in consultation with the Winnipeg School Division, the project is…

  3. BI Project Success

    ERIC Educational Resources Information Center

    Tracey, Graham; Riha, James

    2009-01-01

    Managing business intelligence (BI) projects in higher education is a formidable responsibility that challenges even the most experienced technical project managers. Data source dependencies, uncertain data quality, changing information requirements, and urgency for actionable information are but a few examples among the multitude of challenges.…

  4. The HALI Project

    ERIC Educational Resources Information Center

    Thompson, Brad

    2011-01-01

    This article features The HALI Project and shares experiences that led to the first part of the project--Empowered Parents. This program taught parents how to first come to grips with the reality of their situation, then dream new, appropriate dreams for their children. From there it addressed understanding the ongoing emotional journey and how it…

  5. Interactive Genetics Tutorial Project.

    ERIC Educational Resources Information Center

    Wisconsin Univ., Madison. Dept. of Curriculum and Instruction.

    The Interactive Genetics Tutorial (IGT) project and the Intelligent Tutoring System for the IGT project named MENDEL supplement genetics instruction in biology courses by providing students with experience in designing, conducting, and evaluating genetics experiments. The MENDEL software is designed to: (1) simulate genetics experiments that…

  6. Proficiency Sample Project.

    ERIC Educational Resources Information Center

    Apodaca, Mary

    The instrument for Colorado's Foreign Language Proficiency Sample Project and directions for its administration are provided in this document. The project is a voluntary, teacher-designed and -administered effort to standardize high school student language proficiency assessment techniques. The materials are used in teacher workshops. The…

  7. The Mars Millennium Project.

    ERIC Educational Resources Information Center

    National Aeronautics and Space Administration, Washington, DC.

    The countdown to a new century provides a unique opportunity to engage America's youth in charting a course for the future. The Mars Millennium Project challenges students across the nation to design a community yet to be imagined for the planet Mars. This interdisciplinary learning project aims to encourage K-12 students in classrooms and youth…

  8. Spray combustion stability project

    NASA Technical Reports Server (NTRS)

    Jeng, San-Mou; Litchford, Ron J.

    1992-01-01

    This report summarizes research activity on the Spray Combustion Stability Project, characterizes accomplishments and current status, and discusses projected future work. The purpose is to provide a concise conceptual overview of the research effort to date so the reader can quickly assimilate the gist of the research results and place them within the context of their potential impact on liquid rocket engine design technology.

  9. Milford Visual Communications Project.

    ERIC Educational Resources Information Center

    Milford Exempted Village Schools, OH.

    This study discusses a visual communications project designed to develop activities to promote visual literacy at the elementary and secondary school levels. The project has four phases: (1) perception of basic forms in the environment, what these forms represent, and how they inter-relate; (2) discovery and communication of more complex…

  10. The TULIP Project.

    ERIC Educational Resources Information Center

    Gusack, Nancy, Ed.; And Others

    1995-01-01

    Contains 11 articles that describe different university access systems designed and built to provide access to journals via The University Licensing Program (TULIP), a science journal access project, involving Elsevier Science Publishing and major universities. The project produced insights to help with future electronic information delivery…

  11. The Nordwrite Project.

    ERIC Educational Resources Information Center

    Evensen, Lars, Sigfred

    A planned 3-year joint project of the Nordic research council for the humanities that focuses on writing development in school-age children is described. Four Nordic countries are involved in the project: Finland, Sweden, Norway, and Denmark. In the study, discourse-level performance analyses of student writing in English as a Second Language are…

  12. Educational Project with MIND.

    ERIC Educational Resources Information Center

    Ruddock, Helen; Worrall, Paul

    A project in creative writing and literacy was developed and implemented for people experiencing mental health difficulties. The project was a jointly organized activity between Dearne Valley College and Doncaster MIND in England. (MIND is a network of mental health associations in England and Wales.) The college counselor acted as the supervisor…

  13. Understanding Population Projections.

    ERIC Educational Resources Information Center

    Haub, Carl

    1987-01-01

    Population projections are "what if" computational exercises. Given selected assumptions about future trends in fertility, mortality, and migration, population trends can be projected. Government and business planners need this information, and they also require enough time to put facilities in place to meet future needs. Everyone benefits from a…

  14. Winter Art Education Project

    ERIC Educational Resources Information Center

    Jokela, Timo

    2007-01-01

    The purpose of this article is to describe how the Department of Art Education at the University of Lapland in Finland has developed winter art as a method of environmental and community-based art education. I will focus on the Snow Show Winter Art Education Project, a training project funded by the European Union and the State Provincial Office…

  15. A Holiday Project.

    ERIC Educational Resources Information Center

    Kofod, Maudrey Taranto

    1996-01-01

    Describes a classroom project involving the construction of a holiday mobile. Necessary supplies include a lightweight hanger, construction paper, string, scissors, protractors, compasses, and rulers. Concepts involved in the construction of the project include illustrating a chord, radius, diameter, shapes, metric measuring, circumference, area,…

  16. Distortion in Perspective Projection

    ERIC Educational Resources Information Center

    Kelso, Robert P., Sr.

    2008-01-01

    The paper presents a unique approach in associating perspective projection with the image beheld by the eye and demonstrates that all graphical and photographic perspective projections must contain distortion when compared to the image beheld by the eye. (Contains 8 figures.)

  17. The Plate Tectonics Project

    ERIC Educational Resources Information Center

    Hein, Annamae J.

    2011-01-01

    The Plate Tectonics Project is a multiday, inquiry-based unit that facilitates students as self-motivated learners. Reliable Web sites are offered to assist with lessons, and a summative rubric is used to facilitate the holistic nature of the project. After each topic (parts of the Earth, continental drift, etc.) is covered, the students will…

  18. The Home Microbiome Project

    ScienceCinema

    Gilbert, Jack

    2016-07-12

    The Home Microbiome Project is an initiative aimed at uncovering the dynamic co-associations between people's bacteria and the bacteria found in their homes.The hope is that the data and project will show that routine monitoring of the microbial diversity of your body and of the environment in which you live is possible.

  19. SDM Virtualness Project

    NASA Technical Reports Server (NTRS)

    Lim, Christopher Yit-Seong; Klein, Janice

    2004-01-01

    In the summer of 2001, NASA and Ford Motor Company co-sponsored a research project aimed at improving the education process and application of lessons learned through distant education. The System Design & Management Program (SDM) was used as a laboratory for improving distance learning capabilities. The research project was a follow up to previous research on globally dispersed teams.

  20. The Physics Plus Project.

    ERIC Educational Resources Information Center

    McKim, F. R.

    1983-01-01

    The Physics Plus Project is producing a series of pamphlets designed to supplement existing curricula with physics application topics (such as physics of sports, motor cars, weather, medical physics, energy). Discusses rationale for the projects, pamphlet production, distribution to schools, and use of pamphlet material on examinations. (JM)

  1. Project Planning and Reporting

    NASA Technical Reports Server (NTRS)

    1982-01-01

    Project Planning Analysis and Reporting System (PPARS) is automated aid in monitoring and scheduling of activities within project. PPARS system consists of PPARS Batch Program, five preprocessor programs, and two post-processor programs. PPARS Batch program is full CPM (Critical Path Method) scheduling program with resource capabilities. Can process networks with up to 10,000 activities.

  2. Project Information Packages: Overview.

    ERIC Educational Resources Information Center

    RMC Research Corp., Mountain View, CA.

    This brochure describes a new series of Project Information Packages, a U.S. Office of Education response to the need for a systematic approach to disseminating exemplary projects. The packages describe procedures for developing the necessary administrative support and management framework, as well as instructional methods and techniques. The six…

  3. The Comic Book Project

    ERIC Educational Resources Information Center

    Bitz, Michael

    2008-01-01

    The Comic Book Project (CBP) celebrates its eighth anniversary this year. The project, which just originated with one school in New York City, had grown to encompass thousands of students nationwide. The goal of the CBP is not to create comics the "Marvel way" or to develop the next Stan Lee. Rather, the goal is to give students the opportunity to…

  4. Conservation Science Fair Projects.

    ERIC Educational Resources Information Center

    Soil Conservation Society of America, Ankeny, IA.

    Included are ideas, suggestions, and examples for selecting and designing conservation science projects. Over 70 possible conservation subject areas are presented with suggested projects. References are cited with each of these subject areas, and a separate list of annotated references is included. The references pertain to general subject…

  5. Beacon College Project Directory.

    ERIC Educational Resources Information Center

    Barnett, Lynn, Ed.

    The American Association of Community Colleges' Beacon College Project (BCP) uses funds from the Kellogg Foundation to award two-year grants to "Beacon" community colleges to form consortia with at least five associate colleges, designed to improve a specific aspect of institutional life. A total of 26 projects, many involving community…

  6. Project BEST Final Report.

    ERIC Educational Resources Information Center

    Pankratz, David; Friedenberg, Joan

    Project BEST (Building Energy Systems Technology), a bilingual vocational training program, operated at Oakton Community College between March 1986 and September 1987. The purpose of the project was to provide 60 limited English proficient (LEP) Hispanic and Polish adults with sufficient vocational skills, English language skills, and appropriate…

  7. Projecting Personnel Needs.

    ERIC Educational Resources Information Center

    Kelly, Philip T.

    Increased reliance on personnel services is placing school districts' business operations in a no-win situation. This report evaluates methods of student population projection in relation to teacher costs. Educational costs reflect personnel costs in light of a decrease in the number of pupils being served. Increased enrollment projections create…

  8. The ANTARES Project

    NASA Astrophysics Data System (ADS)

    Amram, Ph.; Anvar, S.; Aslanides, E.; Aubert, J. J.; Azoulay, R.; Basa, S.; Benhammou, Y.; Bernard, F.; Berthier, R.; Bertin, V.; Billault, M.; Biller, S.; Blanc, F.; Blanc, P. E.; Bland, R. W.; Blondeau, F.; de Botton, N.; Bottu, N.; Boulesteix, J.; Brooks, B.; Brunner, J.; Calzas, A.; Carloganu, C.; Carr, J.; Carton, P. H.; Cartwright, S.; Cases, R.; Cassol, F.; Charles, F.; Charles, J.; Desages, F.; Destelle, J. J.; Dispau, G.; Duval, P. Y.; Engelen, J.; Feinstein, F.; Flores, E. C.; Fopma, J.; Fuda, J. L.; Goret, P.; Gosset, L.; Gournay, J. F.; Hernandez, J. J.; Hubaut, F.; Hubbard, R.; Huss, D.; Jaquet, M.; Jelley, N.; Kajfasz, E.; Kouchner, A.; Kudryavtsev, V.; Lachartre, D.; Lafoux, H.; Lamare, P.; Languillat, J. C.; Laugier, J. P.; Le Provost, H.; Loiseau, D.; Loucatos, S.; Magnier, P.; Marc, K.; Marcelin, M.; Martin, L.; Mazeau, B.; Mazure, A.; McMillan, J.; Meessen, C.; Millot, C.; Mols, P.; Montanet, F.; Moorhead, M.; Moscoso, L.; Navas, S.; Nooren, Van; Olivetto, C.; Palanque-Delabrouille, N.; Pallares, A.; Payre, P.; Perrin, P.; Poinsignon, J.; Potheau, R.; Qian, Z.; Raymond, M.; Roberts, J.; Sacquin, Y.; Schuller, J. P.; Schuster, W.; Spooner, N.; Stolarczyk, T.; Tabary, A.; Talby, M.; Tao, C.; Thompson, L.; Triay, R.; Valdy, M.; Velasco, J.; Vigeolas, E.; Vignaud, D.; Vilanova, D.; Wark, D.; Zuniga, J.

    1999-03-01

    The ANTARES project is an international collaboration with the aim of building a deep-sea large area neutrino telescope within the next decade. The achievements and status of the project as at the time of the conference are briefly discussed, and short term steps as well as longer term plans are described.

  9. The Home Microbiome Project

    SciTech Connect

    Gilbert, Jack

    2014-08-25

    The Home Microbiome Project is an initiative aimed at uncovering the dynamic co-associations between people's bacteria and the bacteria found in their homes.The hope is that the data and project will show that routine monitoring of the microbial diversity of your body and of the environment in which you live is possible.

  10. Plant Biology Science Projects.

    ERIC Educational Resources Information Center

    Hershey, David R.

    This book contains science projects about seed plants that deal with plant physiology, plant ecology, and plant agriculture. Each of the projects includes a step-by-step experiment followed by suggestions for further investigations. Chapters include: (1) "Bean Seed Imbibition"; (2) "Germination Percentages of Different Types of Seeds"; (3)…

  11. The Okapi Projects.

    ERIC Educational Resources Information Center

    Keen, Michael

    1997-01-01

    Examines general issues in conducting information retrieval research. Topics include the Okapi information retrieval system and its probabilistic model; the Cranfield projects, concerning recall and precision; the SMART project with its vector-space model; evaluation methodology, including laboratory evaluation of interactive systems; and…

  12. Small Projects First

    ERIC Educational Resources Information Center

    Shang-Kuei, Chen

    1975-01-01

    For thousands of years China has been troubled by droughts and floods. In the past 25 years, the country has worked to alleviate these problems. Numerous water conservation projects requiring the communal efforts of the people have been carried out. Record grain crops have resulted from these projects. (MA)

  13. The Moon Project

    ERIC Educational Resources Information Center

    Trundle, Kathy Cabe; Willmore, Sandra; Smith, Walter S.

    2006-01-01

    What Australia, Alaska, Qatar, Indiana, and Ohio have in common is the authentic writing More Observations Of Nature (MOON) project. In this unique project, teachers from these disparate geographic locations teamed up to instruct children in grades four through eight via the internet on a nearly universally challenging subject for teachers in the…

  14. The Billboard Project

    ERIC Educational Resources Information Center

    Weaver, Victoria

    2005-01-01

    Since 1997, the author coordinated a large-scale billboard project. Coordinated to coincide with the National Art Education Association's celebration of Youth Art Month, strong commitments from faculty, students, administrators, public-relations liaisons, local press, radio, TV, and community businesses have made this project a success. The first…

  15. Mathematics Projects Handbook.

    ERIC Educational Resources Information Center

    Hess, Adrien L.

    This handbook is designed as a guide for teachers and students in choosing and developing mathematics projects, from simple demonstrations of mathematical problems or principles that the teacher has assigned as classroom learning experiences to complex, sophisticated exhibits, intended for entrance in fairs and competitions. The use of projects to…

  16. Fundred Dollar Bill Project

    ERIC Educational Resources Information Center

    Rubin, Mary

    2009-01-01

    This article describes the Fundred Dollar Bill Project which is an innovative artwork made of millions of drawings. This creative collective action is intended to support Operation Paydirt, an extraordinary art/science project uniting three million children with educators, scientists, healthcare professionals, designers, urban planners, engineers,…

  17. Schoolyard Habitat Project Guide.

    ERIC Educational Resources Information Center

    Mason, Rich

    This project aims to provide basic steps for students to restore and create wildlife habitats on school grounds. Four chapters are included in this guide, and each chapter is divided into teacher and student sections. Chapter 1 provides necessary information for starting a habitat project. Chapters 2, 3, and 4 discuss the details for the Forest…

  18. The CLASS Project.

    ERIC Educational Resources Information Center

    National Wildlife Federation, Washington, DC.

    The CLASS project is a series of investigations and projects designed by the National Wildlife Federation as supplementary materials for existing junior high school environmental curricula. This notebook contains nine different sections: an introduction, six content areas, a series of case studies, and a resource bibliography. The six content…

  19. Solar technical assistance provided to Forest City military communities in Hawaii for incorporation of 20-30 MW of solar energy generation to power family housing for US Navy personnel.

    SciTech Connect

    Dominick, Jeff; Merrigan, Tim; Boudra, Will; Miller, Ryan; Cisneros, Gabriela; Rosenthal, Andrew L.; Kuszmaul, Scott S.; Gupta, Vipin P.

    2010-06-01

    In May 2007, Forest City Military Communities won a US Department of Energy Solar America Showcase Award. As part of this award, executives and staff from Forest City Military Communities worked side-by-side with a DOE technical assistance team to overcome technical obstacles encountered by this large-scale real estate developer and manager. This paper describes the solar technical assistance that was provided and the key solar experiences acquired by Forest City Military Communities over an 18 month period.

  20. Bioenergy/Biotechnology projects

    SciTech Connect

    Napper, Stan; Palmer, James; Wilson, Chester; Guilbeau, Eric; Allouche, Erez

    2012-06-30

    This report describes the progress of five different projects. The first is an enzyme immobilization study of cellulase to reduce costs of the cellulosic ethanol process. High reusability and use of substrates applicable to large scale production were focus areas for this study. The second project was the development of nanostructured catalysts for conversion of syngas to diesel. Cobalt nanowire catalyst was used in Fischer-Tropsch synthesis. The third project describes work on developing a microfluidic calorimeter to measure reaction rates of enzymes. The fourth project uses inorganic polymer binders that have the advantage of a lower carbon footprint than Portland cement while also providing excellent performance in elevated temperature, high corrosion resistance, high compressive and tensile strengths, and rapid strength gains. The fifth project investigates the potential of turbines in drop structures (such as sewer lines in tall buildings) to recover energy.

  1. North American LNG Project Sourcebook

    SciTech Connect

    2007-06-15

    The report provides a status of the development of LNG Import Terminal projects in North America, and includes 1-2 page profiles of 63 LNG projects in North America which are either in operation, under construction, or under development. For each project, the sourcebook provides information on the following elements: project description, project ownership, project status, projected operation date, storage capacity, sendout capacity, and pipeline interconnection.

  2. Energy Efficiency Project Development

    SciTech Connect

    IUEP

    2004-03-01

    The International Utility Efficiency Partnerships, Inc. (IUEP) has been a leader among the industry groups that have supported voluntary initiatives to promote international energy efficiency projects and address global climate change. The IUEP maintains its leadership by both supporting international greenhouse gas (GHG) reduction projects under the auspices of the U.S. Department of Energy (DOE) and by partnering with U.S. and international organizations to develop and implement strategies and specific energy efficiency projects. The goals of the IUEP program are to (1) provide a way for U.S. industry to maintain a leadership role in international energy efficiency infrastructure projects; (2) identify international energy project development opportunities to continue its leadership in supporting voluntary market-based mechanisms to reduce GHG emissions; and (3) demonstrate private sector commitment to voluntary approaches to global climate issues. The IUEP is dedicated to identifying, promoting, managing, and assisting in the registration of international energy efficiency projects that result in demonstrated voluntary reductions of GHG emissions. This Final Technical Report summarizes the IUEP's work in identifying, promoting, managing, and assisting in development of these projects and IUEP's effort in creating international cooperative partnerships to support project development activities that develop and deploy technologies that (1) increase efficiency in the production, delivery and use of energy; (2) increase the use of cleaner, low-carbon fuels in processing products; and (3) capture/sequester carbon gases from energy systems. Through international cooperative efforts, the IUEP intends to strengthen partnerships for energy technology innovation and demonstration projects capable of providing cleaner energy in a cost-effective manner. As detailed in this report, the IUEP met program objectives and goals during the reporting period January 1, 2001 through

  3. Project Management for International Development.

    ERIC Educational Resources Information Center

    Axelrod, Valija M.; Magisos, Joel H.

    A project developed a content model for international project management training. It also compiled a bibliography of project management references, identified specific project management training needs based upon a survey of international sponsors and contractor personnel, and documented the training needs of international project managers. Data…

  4. Project EXCEL with Hispanic Children.

    ERIC Educational Resources Information Center

    Pappas, Georgia; Orum, Lori

    1993-01-01

    Describes Project EXCEL (Excellence in Community Educational Leadership), educational project addressing educational needs of Hispanic community. Identifies six models of Project EXCEL (Academia del Pueblo, Project Success, Project Second Chance, Parents as Partners, Teacher Support Network, and Family Reading) and then discusses the first of…

  5. One project`s waste is another project`s resource

    SciTech Connect

    Short, J.

    1997-02-01

    The author describes the efforts being made toward pollution prevention within the DOE complex, as a way to reduce overall project costs, in addition to decreasing the amount of waste to be handled. Pollution prevention is a concept which is trying to be ingrained into project planning. Part of the program involves the concept that ultimately the responsibility for waste comes back to the generator. Parts of the program involve efforts to reuse materials and equipment on new projects, to recycle wastes to generate offsetting revenue, and to increase awareness, accountability and incentives so as to stimulate action on this plan. Summaries of examples are presented in tables.

  6. NACA documents database project

    NASA Technical Reports Server (NTRS)

    Smith, Ruth S.

    1991-01-01

    The plan to get all the National Advisory Committee on Aeronautics (NACA) collection online, with quality records, led to the NACA Documents Data base Project. The project has a two fold purpose: (1) to develop the definitive bibliography of NACA produced and/or held documents; and (2) to make that bibliography and the associated documents available to the aerospace community. This study supports the first objective by providing an analysis of the NACA collection and its bibliographic records, and supports the second objective by defining the NACA archive and recommending methodologies for meeting the project objectives.

  7. The Methanol Economy Project

    SciTech Connect

    Olah, George; Prakash, G. K.

    2014-02-01

    The Methanol Economy Project is based on the concept of replacing fossil fuels with methanol generated either from renewable resources or abundant natural (shale) gas. The full methanol cycle was investigated in this project, from production of methanol through bromination of methane, bireforming of methane to syngas, CO2 capture using supported amines, co-electrolysis of CO2 and water to formate and syngas, decomposition of formate to CO2 and H2, and use of formic acid in a direct formic acid fuel cell. Each of these projects achieved milestones and provided new insights into their respective fields.

  8. Prometheus Project final report

    NASA Technical Reports Server (NTRS)

    Taylor, Randall

    2005-01-01

    This Final Report serves as an executive summary of the Prometheus Project's activities and deliverables from November 2002 through September 2005. It focuses on the challenges from a technical and management perspective, what was different and innovative about this project, and identifies the major options, decisions, and accomplishments of the Project team as a whole. However, the details of the activities performed by DOE NR and its contractors will be documented separately in accordance with closeout requirements of the DOE NR and consistent with agreements between NASA and NR.

  9. West Valley Demonstration Project

    SciTech Connect

    Not Available

    1991-01-01

    Under the West Valley Demonstration Project Act, Public Law 96-368, liquid high-level radioactive waste stored at the Western New York Nuclear Service Center in West Valley, New York, is to be solidified (vitrified) in borosilicate glass and transported to a federal repository for geologic disposal. This waste material resulted from spent nuclear fuel reprocessing operations conducted between 1966 and 1972. Project costs are shared by the US Department of Energy (90 percent) and the New York State Energy Research and Development Authority (10 percent). The site on which the Project is located is owned by New York State. This report is an overview of West Valley's plans and accomplishments.

  10. NAVAJO ELECTRIFICATION DEMONSTRATION PROJECT

    SciTech Connect

    Terry W. Battiest

    2008-06-11

    The Navajo Electrification Demonstration Project (NEDP) is a multi-year project which addresses the electricity needs of the unserved and underserved Navajo Nation, the largest American Indian tribe in the United States. The program serves to cumulatively provide off-grid electricty for families living away from the electricty infrastructure, line extensions for unserved families living nearby (less than 1/2 mile away from) the electricity, and, under the current project called NEDP-4, the construction of a substation to increase the capacity and improve the quality of service into the central core region of the Navajo Nation.

  11. Project LEAF Documents

    EPA Pesticide Factsheets

    Project LEAF has a goal of educating farmworkers about how to reduce pesticide exposure to their families from pesticide residues they may be inadvertently taking home on their clothing, etc. Find outreach materials.

  12. DOE Robotics Project

    SciTech Connect

    Not Available

    1991-01-01

    This document provide the bimonthly progress reports on the Department of Energy (DOE) Robotics Project by the University of Michigan. Reports are provided for the time periods of December 90/January 91 through June 91/July 91. (FI)

  13. Quartermaster Reach Restoration Project

    EPA Pesticide Factsheets

    Information about the SFBWQP Quartermaster Reach Restoration Project, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.

  14. Status of CSNS Project

    NASA Astrophysics Data System (ADS)

    Zhang, J.; Fu, S. N.; Chen, H. S.; Chen, Y. W.; Chen, Y. B.; Dong, H. Y.; Fang, S. X.; Huang, K. X.; Jin, D. P.; Kang, W.; Li, J.; Liu, H. C.; Ma, L.; Ouyang, H. F.; Qu, H. M.; Qi, X.; Sun, H.; Tang, J. Y.; Wang, Q. B.; Wang, S.; Xu, T. G.

    The China Spallation Neutron Source (CSNS) accelerator is designed to accelerate proton beam pulses to 1.6 GeV at 25 Hz repetition rate, striking a solid metal target to produce spallation neutrons. The accelerator provides a beam power of 100 kW on the target in the first phase and then 500 kW in the second phase by increasing the average beam intensity 5 times while raising the linac output energy. The project construction has been formally launched in 2011 and it is planned to complete the project in March 2018. It is one of the high intensity proton accelerator projects in the world and it imposes a great challenge to Chinese accelerator community. This presentation will cover the status and challenges of the CSNS project.

  15. Evaluation of microfinance projects.

    PubMed

    Johnson, S

    1999-08-01

    This paper criticizes the quick system proposed by Henk Moll for evaluating microfinance projects in the article ¿How to Pre-Evaluate Credit Projects in Ten Minutes¿. The author contended that there is a need to emphasize the objectives of the project. The procedure used by Moll, he contended, is applicable only to projects that have only two key objectives, such as credit operations, and the provision of services. Arguments are presented on the three specific questions proposed by Moll, ranging from the availability of externally audited financial reports, the performance of interest rate on loans vis-a-vis the inflation rate, and the provision of loans according to the individual requirements of the borrowers. Lastly, the author emphasizes that the overall approach is not useful and suggests that careful considerations should be observed in the use or abuse of a simple scoring system or checklist such as the one proposed by Moll.

  16. The Poisons Project.

    ERIC Educational Resources Information Center

    Crawford, Barbara A.

    1998-01-01

    Details a project in which students explore and study the poisons in their environment by asking and finding answers to their own research questions. Includes some suggestions for involving students successfully in inquiry-based learning. (DDR)

  17. Municipal Complex Solar Project

    SciTech Connect

    Sher, Jono; Toth, Andrew

    2015-02-12

    This project is a great benefit to the City of Perth Amboy by saving energy and savings costs. The project serves as a great example to city residents about the importance of renewable energy, energy conservation and other environmental topics. An electronic display in the City Hall shows how much energy was generated on that day, how much energy is saved, and environmental benefits. The project serves to educate people of environmental concerns and may spark the interest of individuals in other environmental topics. Hopefully, other residents will be encouraged to use solar energy. The project is also saving money for the City and its taxpayers. Anywhere we can save money means that residents can pay less in taxes and/or the City can provide improved services.

  18. The Classroom Space Project.

    ERIC Educational Resources Information Center

    Verbickas, Sarah

    2002-01-01

    Introduces the Classroom Space project aimed at revitalizing science education at Key Stages 3 and 4 by using exciting examples from Space Science and Astronomy to illustrate key science concepts. (Author/YDS)

  19. Vitamin D Pooling Project

    Cancer.gov

    The Vitamin D Pooling Project of Rarer Cancers brought together investigators from 10 cohorts to conduct a large prospective epidemiologic study of the association between vitamin D status and seven rarer cancers.

  20. Robotic Lander Development Project

    NASA Video Gallery

    The Robotic Lander Development Project at the Marshall Center is testing a prototype lander that will aid in the design and development of a new generation of small, smart, versatile robotic lander...

  1. Partridge Creek Diversion Project

    EPA Pesticide Factsheets

    Goal: prevent mercury contamination by keeping the creek from flowing through a mine pit. The project improved brook trout habitat, green infrastructure, the local economy, and decreased human health risks. Includes before-and-after photos.

  2. Space Traveler Project.

    ERIC Educational Resources Information Center

    Instructor, 1981

    1981-01-01

    Describes the winners of the Space Traveler Project, a contest jointly sponsored by Rockwell International, NASA, and this magazine to identify worthwhile elementary science programs relating to the Space Shuttle. (SJL)

  3. Mathematics Case Methods Project.

    ERIC Educational Resources Information Center

    Barnett, Carne S.

    1998-01-01

    Presents an overview and analysis of the Mathematics Case Methods Project, which uses cases in order to examine and reflect upon teaching. Focuses on a special kind of teacher knowledge, coined pedagogical-content knowledge. (ASK)

  4. Navajo Electrification Demonstraiton Project

    SciTech Connect

    Larry Ahasteen, Project Manager

    2006-07-17

    This is a final technical report required by DOE for the Navajo Electrification Demonstration Program, This report covers the electric line extension project for Navajo families that currently without electric power.

  5. Air Traffic Network Project

    NASA Technical Reports Server (NTRS)

    1997-01-01

    The high level requirement of the Air Traffic Network (ATN) project is to provide a mechanism for evaluating the impact of router scheduling modifications on a networks efficiency, without implementing the modifications in the live network.

  6. Project Delivery Methods.

    ERIC Educational Resources Information Center

    Dolan, Thomas G.

    2003-01-01

    Describes project delivery methods that are replacing the traditional Design/Bid/Build linear approach to the management, design, and construction of new facilities. These variations can enhance construction management and teamwork. (SLD)

  7. Fort Yukon Greenhouse Project

    EPA Pesticide Factsheets

    The Tanana Chiefs Conference is an EPA Climate Showcase Community. EPA’s Climate Showcase Communities Program helps local governments and tribal nations pilot innovative, cost-effective and replicable community-based greenhouse gas reduction projects.

  8. Principles of project management

    NASA Technical Reports Server (NTRS)

    1982-01-01

    The basic principles of project management as practiced by NASA management personnel are presented. These principles are given as ground rules and guidelines to be used in the performance of research, development, construction or operational assignments.

  9. Lake Charles CCS Project

    SciTech Connect

    Leib, Thomas; Cole, Dan

    2015-06-30

    In late September 2014 development of the Lake Charles Clean Energy (LCCE) Plant was abandoned resulting in termination of Lake Charles Carbon Capture and Sequestration (CCS) Project which was a subset the LCCE Plant. As a result, the project was only funded through Phase 2A (Design) and did not enter Phase 2B (Construction) or Phase 2C (Operations). This report was prepared relying on information prepared and provided by engineering companies which were engaged by Leucadia Energy, LLC to prepare or review Front End Engineering and Design (FEED) for the Lake Charles Clean Energy Project, which includes the Carbon Capture and Sequestration (CCS) Project in Lake Charles, Louisiana. The Lake Charles Carbon Capture and Sequestration (CCS) Project was to be a large-scale industrial CCS project intended to demonstrate advanced technologies that capture and sequester carbon dioxide (CO2) emissions from industrial sources into underground formations. The Scope of work was divided into two discrete sections; 1) Capture and Compression prepared by the Recipient Leucadia Energy, LLC, and 2) Transport and Sequestration prepared by sub-Recipient Denbury Onshore, LLC. Capture and Compression-The Lake Charles CCS Project Final Technical Report describes the systems and equipment that would be necessary to capture CO2 generated in a large industrial gasification process and sequester the CO2 into underground formations. The purpose of each system is defined along with a description of its equipment and operation. Criteria for selection of major equipment are provided and ancillary utilities necessary for safe and reliable operation in compliance with environmental regulations are described. Construction considerations are described including a general arrangement of the CCS process units within the overall gasification project. A cost estimate is provided, delineated by system area with cost breakdown showing equipment, piping and materials

  10. Visible Human Project

    MedlinePlus

    ... Toxicology Health Services Research & Public Health Health Information Technology NLM for You Grants & Funding Meaningful Use Tools Training & Outreach Network of Medical Libraries Regional Activities Careers @ NLM Mobile Gallery Site Navigation Home The Visible Human Project ® ...

  11. Student Originated Projects

    ERIC Educational Resources Information Center

    Young, L. J.; Purcupile, J. C.

    1972-01-01

    Describes an interdisciplinary research project on production of food or fodder yeast from sewage. Indicates the presence of satisfactory educational and experimental results in operation of a pilot plant. (CC)

  12. Project financial evaluation

    SciTech Connect

    None, None

    2009-01-18

    The project financial section of the Renewable Energy Technology Characterizations describes structures and models to support the technical and economic status of emerging renewable energy options for electricity supply.

  13. Desktop Computing Integration Project

    NASA Technical Reports Server (NTRS)

    Tureman, Robert L., Jr.

    1992-01-01

    The Desktop Computing Integration Project for the Human Resources Management Division (HRMD) of LaRC was designed to help division personnel use personal computing resources to perform job tasks. The three goals of the project were to involve HRMD personnel in desktop computing, link mainframe data to desktop capabilities, and to estimate training needs for the division. The project resulted in increased usage of personal computers by Awards specialists, an increased awareness of LaRC resources to help perform tasks, and personal computer output that was used in presentation of information to center personnel. In addition, the necessary skills for HRMD personal computer users were identified. The Awards Office was chosen for the project because of the consistency of their data requests and the desire of employees in that area to use the personal computer.

  14. The Mississippi CCS Project

    SciTech Connect

    Doug Cathro

    2010-09-30

    The Mississippi CCS Project is a proposed large-scale industrial carbon capture and sequestration (CCS) project which would have demonstrated advanced technologies to capture and sequester carbon dioxide (CO{sub 2}) emissions from industrial sources into underground formations. Specifically, the Mississippi CCS Project was to accelerate commercialization of large-scale CO{sub 2} storage from industrial sources by leveraging synergy between a proposed petcoke to Substitute Natural Gas (SNG) plant that is selected for a Federal Loan Guarantee and would be the largest integrated anthropogenic CO{sub 2} capture, transport, and monitored sequestration program in the U.S. Gulf Coast Region. The Mississippi CCS Project was to promote the expansion of enhanced oil recovery (EOR) in the Mississippi, Alabama and Louisiana region which would supply greater energy security through increased domestic energy production. The capture, compression, pipeline, injection, and monitoring infrastructure would have continued to sequester CO{sub 2} for many years after the completion of the term of the DOE agreement. The objectives of this project were expected to be fulfilled through two distinct phases. The overall objective of Phase 1 was to develop a fully definitive project basis for a competitive Renewal Application process to proceed into Phase 2 - Design, Construction and Operations. Phase 1 included the studies that establish the engineering design basis for the capture, compression and transportation of CO{sub 2} from the MG SNG Project, and the criteria and specifications for a monitoring, verification and accounting (MVA) plan at the Soso oil field in Mississippi. The overall objective of Phase 2, was to execute design, construction and operations of three capital projects: the CO{sub 2} capture and compression equipment, the Mississippi CO{sub 2} Pipeline to Denbury's Free State Pipeline, and an MVA system at the Soso oil field.

  15. Badgers gasohol project

    SciTech Connect

    Not Available

    1981-07-29

    It is reported that Badger Energy is to participate in a gasohol project that will utilize the Tate and Lyle fermentation process at the proposed plant at Thibodaux, La., to produce 20 million gal/year of ethanol. The facility will be able to process alternative feedstocks such as grain, sorghum and sugar cane. The Dept. of Energy is funding the first phase of the project, which includes a feasibility study, by a grant of $1.9 million.

  16. Spray combustion stability project

    NASA Technical Reports Server (NTRS)

    Jeng, San-Mou; Litchford, Ron J.

    1990-01-01

    This report summarizes research activity on the Spray Combustion Stability Project, characterizes accomplishments and current status, and discusses projected future work. The purpose is to provide a concise conceptual overview of the research effort so the reader can quickly assimilate the gist of the research results and place them within the context of their potential impact on liquid rocket engine design technology. Therefore, this report does not elaborate on many of the detailed technical aspects of the research program.

  17. A Monster Transfer Project

    ERIC Educational Resources Information Center

    Brennan, Alan

    2003-01-01

    In this article, the author discusses a transfer project that involves the use of "monsters" to provide year 6 with a series of post-SATs activities which could then be built on in year 7. The project evolves from a science-based activity into a cross-curricular one. "Monsters" was used as a fun revision tool for year 6 pupils covering the area of…

  18. Student Research Projects

    NASA Technical Reports Server (NTRS)

    Yeske, Lanny A.

    1998-01-01

    Numerous FY1998 student research projects were sponsored by the Mississippi State University Center for Air Sea Technology. This technical note describes these projects which include research on: (1) Graphical User Interfaces, (2) Master Environmental Library, (3) Database Management Systems, (4) Naval Interactive Data Analysis System, (5) Relocatable Modeling Environment, (6) Tidal Models, (7) Book Inventories, (8) System Analysis, (9) World Wide Web Development, (10) Virtual Data Warehouse, (11) Enterprise Information Explorer, (12) Equipment Inventories, (13) COADS, and (14) JavaScript Technology.

  19. Black Pine Circle Project

    ScienceCinema

    Mytko, Christine

    2016-07-12

    A group of seventh graders from Black Pine Circle school in Berkeley had the opportunity to experience the Advanced Light Source (ALS) as "users" via a collaborative field trip and proposal project. The project culminated with a field trip to the ALS for all seventh graders, which included a visit to the ALS data visualization room, a diffraction demonstration, a beamline tour, and informative sessions about x-rays and tomography presented by ALS scientists.

  20. The Supernova Key Project

    NASA Astrophysics Data System (ADS)

    Howell, Dale Andrew

    2017-01-01

    Las Cumbres Observatory is a global network of robotic telescopes specializing in time domain astronomy. It currently has nine 1m telescopes, two 2m telescopes, and seven 0.4m telescopes. The Supernova Key Project is a 3 year program to obtain light curves and spectra of 500 supernovae with Las Cumbres Observatory. Here we show recent results, detail plans for the next Supernova Key Project, and explain how the US community can get involved.

  1. COBRA Main Engine Project

    NASA Technical Reports Server (NTRS)

    Snoddy, Jim; Sides, Steve; Lyles, Garry M. (Technical Monitor)

    2002-01-01

    The COBRA (CO-Optimized Booster for Reusable Applications) project include the following: 1. COBRA main engine project team. 2. COBRA and RLX cycles selected. 3. COBRA proto-type engine approach enables mission success. 4. COBRA provides quick, low cost demo of cycle and technologies. 5. COBRA cycle I risk reduction supports. 6. Achieving engine safety. 6. RLX cycle I risk reduction supports. 7. Flight qualification. 9. Life extension engine testing.

  2. Black Pine Circle Project

    SciTech Connect

    Mytko, Christine

    2014-03-31

    A group of seventh graders from Black Pine Circle school in Berkeley had the opportunity to experience the Advanced Light Source (ALS) as "users" via a collaborative field trip and proposal project. The project culminated with a field trip to the ALS for all seventh graders, which included a visit to the ALS data visualization room, a diffraction demonstration, a beamline tour, and informative sessions about x-rays and tomography presented by ALS scientists.

  3. Solar education project workshop

    SciTech Connect

    Smith, J.B.

    1980-10-31

    A summary of proceedings of the Solar Education Project Workshop is presented. The workshop had as its focus the dissemination of curriculum materials developed by the Solar Energy Project of the New York State Department of Education under the sponsorship of the US Department of Energy. It includes, in addition to presentations by speakers and workshop leaders, specific comments from participants regarding materials available and energy-related activities underway in their respective states and suggested strategies from them for ongoing dissemination efforts.

  4. Current projects in Fuzzy Control

    NASA Technical Reports Server (NTRS)

    Sugeno, Michio

    1990-01-01

    Viewgraphs on current projects in fuzzy control are presented. Three projects on helicopter flight control are discussed. The projects are (1) radio control by oral instructions; (2) automatic autorotation entry in engine failure; and (3) unmanned helicopter for sea rescue.

  5. Project S'COOL

    NASA Technical Reports Server (NTRS)

    Green, Carolyn J.; Chambers, Lin H.

    1998-01-01

    The Students Clouds Observations On-Line or S'COOL project was piloted in 1997. It was created with the idea of using students to serve as one component of the validation for the Clouds and the Earth's Radiant Energy System (CERES) instrument which was launched with the Tropical Rainfall Measuring Mission (TRMM) in November, 1997. As part of NASA's Earth Science Enterprise CERES is interested in the role clouds play in regulating our climate. Over thirty schools became involved in the initial thrust of the project. The CERES instrument detects the location of clouds and identifies their physical properties. S'COOL students coordinate their ground truth observations with the exact overpass of the satellite at their location. Their findings regarding cloud type, height, fraction and opacity as well as surface conditions are then reported to the NASA Langley Distributed Active Archive Center (DAAC). The data is then accessible to both the CERES team for validation and to schools for educational application via the Internet. By March of 1998 ninety-three schools, in nine countries had enrolled in the S'COOL project. Joining the United States participants were from schools in Australia, Canada, France, Germany, Norway, Spain, Sweden, and Switzerland. The project is gradually becoming the global project envisioned by the project s creators. As students obtain the requested data useful for the scientists, it was hoped that students with guidance from their instructors would have opportunity and motivation to learn more about clouds and atmospheric science as well.

  6. Using a Project Portfolio: Empowerment Evaluation for Model Demonstration Projects.

    ERIC Educational Resources Information Center

    Baggett, David

    For model postsecondary demonstration projects serving individuals with disabilities, a portfolio of project activities may serve as a method for program evaluation, program replication, and program planning. Using a portfolio for collecting, describing, and documenting a project's successes, efforts, and failures enables project staff to take…

  7. California Hydrogen Infrastructure Project

    SciTech Connect

    Heydorn, Edward C

    2013-03-12

    Air Products and Chemicals, Inc. has completed a comprehensive, multiyear project to demonstrate a hydrogen infrastructure in California. The specific primary objective of the project was to demonstrate a model of a real-world retail hydrogen infrastructure and acquire sufficient data within the project to assess the feasibility of achieving the nation's hydrogen infrastructure goals. The project helped to advance hydrogen station technology, including the vehicle-to-station fueling interface, through consumer experiences and feedback. By encompassing a variety of fuel cell vehicles, customer profiles and fueling experiences, this project was able to obtain a complete portrait of real market needs. The project also opened its stations to other qualified vehicle providers at the appropriate time to promote widespread use and gain even broader public understanding of a hydrogen infrastructure. The project engaged major energy companies to provide a fueling experience similar to traditional gasoline station sites to foster public acceptance of hydrogen. Work over the course of the project was focused in multiple areas. With respect to the equipment needed, technical design specifications (including both safety and operational considerations) were written, reviewed, and finalized. After finalizing individual equipment designs, complete station designs were started including process flow diagrams and systems safety reviews. Material quotes were obtained, and in some cases, depending on the project status and the lead time, equipment was placed on order and fabrication began. Consideration was given for expected vehicle usage and station capacity, standard features needed, and the ability to upgrade the station at a later date. In parallel with work on the equipment, discussions were started with various vehicle manufacturers to identify vehicle demand (short- and long-term needs). Discussions included identifying potential areas most suited for hydrogen fueling stations

  8. Instrument validation project

    SciTech Connect

    Reynolds, B.A.; Daymo, E.A.; Geeting, J.G.H.; Zhang, J.

    1996-06-01

    Westinghouse Hanford Company Project W-211 is responsible for providing the system capabilities to remove radioactive waste from ten double-shell tanks used to store radioactive wastes on the Hanford Site in Richland, Washington. The project is also responsible for measuring tank waste slurry properties prior to injection into pipeline systems, including the Replacement of Cross-Site Transfer System. This report summarizes studies of the appropriateness of the instrumentation specified for use in Project W-211. The instruments were evaluated in a test loop with simulated slurries that covered the range of properties specified in the functional design criteria. The results of the study indicate that the compact nature of the baseline Project W-211 loop does not result in reduced instrumental accuracy resulting from poor flow profile development. Of the baseline instrumentation, the Micromotion densimeter, the Moore Industries thermocouple, the Fischer and Porter magnetic flow meter, and the Red Valve Pressure transducer meet the desired instrumental accuracy. An alternate magnetic flow meter (Yokagawa) gave nearly identical results as the baseline fischer and Porter. The Micromotion flow meter did not meet the desired instrument accuracy but could potentially be calibrated so that it would meet the criteria. The Nametre on-line viscometer did not meet the desired instrumental accuracy and is not recommended as a quantitative instrument although it does provide qualitative information. The recommended minimum set of instrumentation necessary to ensure the slurry meets the Project W-058 acceptance criteria is the Micromotion mass flow meter and delta pressure cells.

  9. The Rural Outreach Project

    NASA Technical Reports Server (NTRS)

    Coleman, Clarence D.

    2000-01-01

    The Rural Outreach Project was designed to increase the diversity of NASA's workforce by: 1) Conducting educational research designed to investigate the most effective strategies for expanding innovative, NASA-sponsored pre-college programs into rural areas; 2) Field-testing identified rural intervention strategies; 3) Implementing expanded NASA educational programs to include 300 rural students who are disabled, female and/or minority; and 4) Disseminating project strategies. The Project was a partnership that included NASA Langley Research Center's Office of Education, Norfolk State University, Cooperative Hampton Roads Organizations for Minorities in Engineering (CHROME) and Paul D. Camp Community College. There were four goals and activities identified for this project; 1) Ascertain effective strategies for expanding successful NASA-sponsored urban-based, pre-college programs into rural settings; 2) Field test identified rural intervention strategies; 3) Publish or disseminate two reports, concerning project research and activities at a national conference; 4) Provide educational outreach to 300, previously underserved, rural students who are disabled, female and /or minority.

  10. The PANDA project

    NASA Astrophysics Data System (ADS)

    Katinka Petersen, Anna; Brasseur, Guy; Granier, Claire; Bouarar, Idir; Wang, Xuemei

    2014-05-01

    The PANDA project Even though air quality in many urbanized and industrialized areas of the world has improved as a result of mitigation actions, it has declined in other regions. This is specifically the case in many emerging countries where emissions have been increasing as a result of rapidly expanding motor vehicle fleets, growing industrial and power generation activities, and domestic and biomass burning. The situation is particularly acute in China and the Western Pacific Region with rapid industrialization and urbanization, where, in spite of efforts to reduce surface emissions of reactive gases, 360,000 people die prematurely from air pollution each year, according to the World Health Organization. The EU-funded PANDA project will offer scientific knowledge that will help China and other nations to use space and in-situ observations together with a modelling system to address improve air quality and human heath at the regional and global scales. Through the proposed cooperation between Europe and China, the following objectives will be reached before the completion of the Project: 1. Improvement of methods for monitoring air quality from combined space and in-situ observations 2. Elaboration of indicators for air quality, in support of European and Chinese policies 3. Development of toolboxes for air quality and emissions monitoring 4. Dissemination of information and educational activities, specifically in China. We would like to introduce the EU-funded project PANDA, and present the first results obtained through the project.

  11. Japan's Sunshine Project

    NASA Astrophysics Data System (ADS)

    1992-07-01

    The 1991 results of the Sunshine Project carried out by the Japanese government's MITI is summarized. The outline of the project is given in terms of basic research and development of new energy technology, Sunshine Project promotion/support researches, and international cooperation. As for the basic R and D, research and development of ocean energy, wind energy, and bio-energy are conducted, and the analytical evaluation is made. Concerning the project promotion/support researches, the issue of introduction of new energy such as energy and environment, energy use best mix, etc. was studied. As to the international cooperation, exchanges with international organizations like IEA, participation in international joint projects, and exchange and collection of information are conducted. Details are mainly given to the studies of the ocean thermal energy conversion system, the large wind turbine power generation system, production of hydrocarbon system from CO2 fixation plant, energy conversion by microbial photosynthesis, production of new fuel oil by biotechnology, growth control compounds for biomass, etc.

  12. 2020 Vision Project Summary

    SciTech Connect

    Gordon, K.W.; Scott, K.P.

    2000-11-01

    Since the 2020 Vision project began in 1996, students from participating schools have completed and submitted a variety of scenarios describing potential world and regional conditions in the year 2020 and their possible effect on US national security. This report summarizes the students' views and describes trends observed over the course of the 2020 Vision project's five years. It also highlights the main organizational features of the project. An analysis of thematic trends among the scenarios showed interesting shifts in students' thinking, particularly in their views of computer technology, US relations with China, and globalization. In 1996, most students perceived computer technology as highly beneficial to society, but as the year 2000 approached, this technology was viewed with fear and suspicion, even personified as a malicious, uncontrollable being. Yet, after New Year's passed with little disruption, students generally again perceived computer technology as beneficial. Also in 1996, students tended to see US relations with China as potentially positive, with economic interaction proving favorable to both countries. By 2000, this view had transformed into a perception of China emerging as the US' main rival and ''enemy'' in the global geopolitical realm. Regarding globalization, students in the first two years of the project tended to perceive world events as dependent on US action. However, by the end of the project, they saw the US as having little control over world events and therefore, we Americans would need to cooperate and compromise with other nations in order to maintain our own well-being.

  13. The Astronomy Genealogy Project

    NASA Astrophysics Data System (ADS)

    Tenn, Joseph S.

    2014-01-01

    The Astronomy Genealogy Project, to be known as AstroGen, will list as many as possible of the world's astronomers with their academic parents (aka thesis advisors) and enable the reader to trace both academic ancestors and descendants. It will be very similar to the highly successful Mathematics Genealogy Project (MGP), available at http://genealogy.math.ndsu.nodak.edu. The MGP, which has been in operation since 1996, now contains the names of about 170,000 "mathematicians." These include many physicists and astronomers, as well as practitioners of related sciences. Mitchel Keller, the director of the MGP, has generously shared the software used in that project, and the American Astronomical Society (AAS) will host AstroGen, a project of the Historical Astronomy Division, on its website. We expect to start seeking entries soon, depending on the availability of computational assistance from the AAS IT department. We are seeking volunteers to help run the project. If you are interested, please contact me at joe.tenn@sonoma.edu.

  14. The human genome project.

    PubMed Central

    Olson, M V

    1993-01-01

    The Human Genome Project in the United States is now well underway. Its programmatic direction was largely set by a National Research Council report issued in 1988. The broad framework supplied by this report has survived almost unchanged despite an upheaval in the technology of genome analysis. This upheaval has primarily affected physical and genetic mapping, the two dominant activities in the present phase of the project. Advances in mapping techniques have allowed good progress toward the specific goals of the project and are also providing strong corollary benefits throughout biomedical research. Actual DNA sequencing of the genomes of the human and model organisms is still at an early stage. There has been little progress in the intrinsic efficiency of DNA-sequence determination. However, refinements in experimental protocols, instrumentation, and project management have made it practical to acquire sequence data on an enlarged scale. It is also increasingly apparent that DNA-sequence data provide a potent means of relating knowledge gained from the study of model organisms to human biology. There is as yet little indication that the infusion of technology from outside biology into the Human Genome Project has been effectively stimulated. Opportunities in this area remain large, posing substantial technical and policy challenges. PMID:8506271

  15. Project Plan Remote Target Fabrication Refurbishment Project

    SciTech Connect

    Bell, Gary L; Taylor, Robin D

    2009-08-01

    authorization for the work was received in July 2009 under the Remote Target Fabrication Refurbishment Task of the Enhanced Utilization of Isotope Facilities project (Project Identification Code 2005230) funded by the American Recovery and Reinvestment Act of 2009. The goal of this project is to recover the capability to produce 4-5 curium targets for the irradiation period starting with HFIR cycle 427, currently scheduled to begin 2/17/10. Assuming success, the equipment would then be used to fabricate 6-7 additional targets to hold for the next irradiation campaign specified by the program. Specific objectives are the return to functionality of the Cubicle 3 Pellet Fabrication Line; Cubicle 2 Target Assembly equipment; and Cubicle 1 Target Inspection and Final Assembly system.

  16. Sun light European Project

    NASA Astrophysics Data System (ADS)

    Soubielle, Marie-Laure

    2015-04-01

    2015 has been declared the year of light. Sunlight plays a major role in the world. From the sunbeams that heat our planet and feed our plants to the optical analysis of the sun or the modern use of sun particles in technologies, sunlight is everywhere and it is vital. This project aims to understand better the light of the Sun in a variety of fields. The experiments are carried out by students aged 15 to 20 in order to share their discoveries with Italian students from primary and secondary schools. The experiments will also be presented to a group of Danish students visiting our school in January. All experiments are carried out in English and involve teams of teachers. This project is 3 folds: part 1: Biological project = what are the mechanisms of photosynthesis? part 2: Optical project= what are the components of sunlight and how to use it? part 3: Technical project= how to use the energy of sunlight for modern devices? Photosynthesis project Biology and English Context:Photosynthesis is a process used by plants and other organisms to convert light energy, normally from the Sun, into chemical energy that can later fuel the organisms' activities. This chemical energy is stored in molecules which are synthesized from carbon dioxide and water. In most cases, oxygen is released as a waste product. Most plants perform photosynthesis. Photosynthesis maintains atmospheric oxygen levels and supplies all of the organic compounds and most of the energy necessary for life on Earth. Outcome: Our project consists in understanding the various steps of photosynthesis. Students will shoot a DVD of the experiments presenting the equipments required, the steps of the experiments and the results they have obtained for a better understanding of photosynthesis Digital pen project Electricity, Optics and English Context: Sunlight is a complex source of light based on white light that can be decomposed to explain light radiations or colours. This light is a precious source to create

  17. NAESA Augmentation Pilot Project

    NASA Technical Reports Server (NTRS)

    Hoover, John J.

    1998-01-01

    This project was one project within the Native American Earth and Space Academy (NAESA). NAESA is a national initiative comprised of several organizations that support programs which focus on 1) enhancing the technological, scientific and pedagogical skills of K-14 teachers who instruct Native Americans, 2) enhancing the understanding and applications of science, technology, and engineering of college-bound Native Americans and teaching them general college "survival skills" (e.g., test taking, time management, study habits), 3) enhancing the scientific and pedagogical skills of the faculty of tribally-controllcd colleges and community colleges with large Native American enrollments, and 4) strengthening the critical relationships between students, their parents, tribal elders, and their communities. This Augmentation Pilot Project focused on the areas of community-school alliances and intemet technology use in teaching and learning and daily living addressing five major objectives.

  18. The Eclipse Project

    NASA Technical Reports Server (NTRS)

    Tucker, Tom; Launius, Roger (Technical Monitor)

    2000-01-01

    The Eclipse Project by Tom Tucker provides a readable narrative and a number of documents that record an important flight research effort at NASA's Dryden Flight Research Center. Carried out by Kelly Space and Technology, Inc., in partnership with the Air Force and Dryden at Edwards Air Force Base in the Mojave Desert of California, this project tested and gathered data about a potential newer and less expensive way to launch satellites into space. Whether the new technology comes into actual use will depend on funding, market forces, and other factors at least partly beyond the control of the participants in the project. This is a familiar situation in the history of flight research.

  19. Enhanced project management tool

    NASA Technical Reports Server (NTRS)

    Maluf, David A. (Inventor); Hsu, Chen-Jung (Inventor); Patel, Hemil N. (Inventor); Moh Hashim, Jairon C. (Inventor); Tran, Khai Peter B. (Inventor)

    2012-01-01

    A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as one or more of a monthly report, a task plan report, a schedule report, a budget report and a risk management report, are generated and made available for display or further analysis or collection into a customized report template. An extensible database allows searching for information based upon context and upon content. Seven different types of project risks are addressed, including non-availability of required skill mix of workers. The system can be configured to exchange data and results with corresponding portions of similar project analyses, and to provide user-specific access to specified information.

  20. Project ACHIEVE final report

    SciTech Connect

    1997-06-13

    Project ACHIEVE was a math/science academic enhancement program aimed at first year high school Hispanic American students. Four high schools -- two in El Paso, Texas and two in Bakersfield, California -- participated in this Department of Energy-funded program during the spring and summer of 1996. Over 50 students, many of whom felt they were facing a nightmare future, were given the opportunity to work closely with personal computers and software, sophisticated calculators, and computer-based laboratories -- an experience which their regular academic curriculum did not provide. Math and science projects, exercises, and experiments were completed that emphasized independent and creative applications of scientific and mathematical theories to real world problems. The most important outcome was the exposure Project ACHIEVE provided to students concerning the college and technical-field career possibilities available to them.

  1. Breckinridge Project, initial effort

    SciTech Connect

    None, None

    1982-09-01

    Report III, Volume 1 contains those specifications numbered A through J, as follows: General Specifications (A); Specifications for Pressure Vessels (C); Specifications for Tanks (D); Specifications for Exchangers (E); Specifications for Fired Heaters (F); Specifications for Pumps and Drivers (G); and Specifications for Instrumentation (J). The standard specifications of Bechtel Petroleum Incorporated have been amended as necessary to reflect the specific requirements of the Breckinridge Project, and the more stringent specifications of Ashland Synthetic Fuels, Inc. These standard specifications are available to the Initial Effort (Phase Zero) work performed by all contractors and subcontractors. Report III, Volume 1 also contains the unique specifications prepared for Plants 8, 15, and 27. These specifications will be substantially reviewed during Phase I of the project, and modified as necessary for use during the engineering, procurement, and construction of this project.

  2. Brazilian Eratosthenes Project

    NASA Astrophysics Data System (ADS)

    Langhi, R.; Vilaça, J.

    2014-10-01

    The objective of Brazilian Eratosthenes Project is the development and application of teaching training actions according the ``docent autonomy" concept to basic Astronomy Education. Argentina coordinates the project in South America, but Brazil works in this project since 2010 with the theme ``Projeto Eratóstenes Brasil" in the homepage: http://sites.google.com/site/projetoerato. Two schools measure a sticks shadow and communicate their results. After, they calculate an average radius of Earth. The stick (gnomon) should stay in vertical position in the leveled ground. Since 2010, the project received hundreds of Brazilian schools with different experiments that were constructed with autonomy, because our site doesn't show some itinerary pre-ready to elaborate the experiments. To collect data for our research, we will use interviews via Skype with the teachers. These data are useful to researches about Science Education area and the Teaching Formation. Teaching professional practice could change and we see modifications in the teachers work, what depends of their realities and context. This project intents to respect the docent autonomy. This autonomy to responsible modifications during continued formation is called ``activist formative model" according Langhi & Nardi (Educação em Astronomia: repensando a formação de professores. São Paulo: Escrituras Editora, 2012). This project discusses about researches in Astronomy Education - still extreme rare in Brazil, when we compare with other areas in Science Education. We believe that actions like this could motivate the students to learn more Astronomy. Furthermore, this national action can be a rich source of data to investigations about teaching formation and scientific divulgation.

  3. Student's Microsatellite Project

    NASA Astrophysics Data System (ADS)

    Zelentsov, Victor; Kopik, Anatoliy; Karpenko, Stanislav; Mayorova, Victoria

    2002-01-01

    Nowadays BMSTU Youth space center carries on development of the microsatellite project. The project is based on principles of students direct involvement on all stages of development and maintenance of the satellite. The group of students was organized within the university with purpose of coordination of work at the program. Project current condition The work on creation of an experimental model of the micro satellite is performed. The aim is to define the structure and parameters of on-board devices (mass-overall dimensions characteristics, energy consumption and so on). developed. According to the simplified model an active stabilization system (three orthogonal electro-magnetic coils) and orientation characterization system (sunlight detector and magnitometer) are included in OCS structure. most suitable battery storage, power-supply controlling system. Student micro-satellite program goals 1.Scientific Information gaining in the field of Earth study- using perspective research methods. Studying of new devices behavior in space conditions. 2. Educative a. Students derive real experience of projecting, building of a spacecraft from the point of view of an experimenter, a constructor and a researcher. b. Organization of student's cooperation with key men of aerospace industry and other branches. c. Brainpower and material base preparation for micro-satellite systems' development. d. Attraction of youth interest to the topic, by: - Students' and pupils' groups attraction and involvement in experiments conduction and results processing. - Seminars and lections devoted to Earth study from the space organization - Specific scientific data distribution over World Wide Web. 3. International With purpose of program expansion, the developers' group looks to start of an international project. Within the project new experiments conduction and scientific information exchange are expected. 4. Status Bauman Moscow State Technical University's status improvement in the field

  4. Managemant of NASA's major projects

    NASA Technical Reports Server (NTRS)

    James, L. B.

    1973-01-01

    Approaches used to manage major projects are studied and the existing documents on NASA management are reviewed. The work consists of: (1) the project manager's role, (2) request for proposal, (3) project plan, (4) management information system, (5) project organizational thinking, (6) management disciplines, (7) important decisions, and (8) low cost approach.

  5. Perspective Projection Invariants,

    DTIC Science & Technology

    1986-02-01

    ORGANIZATION NAME ANC ADDRESS 10. PROGRAM ELEMENT. PROJECT. TASK Artificial Inteligence Laboratory AREA & WORK UNIT NUMBERSO 545 Technology Square dCambridge...AD-AI67 793 PERSPECTIVE PROJECTION INVARIANTS(U) MASSACHUSETTS INST 1/1~ OF TECH CAMBRIDGE ARTIFICIAL INTELLIGENCE LAB VERRI ET AL, FEB 86 AI-M-832...0R020I4 661 SEC R TVC PAGE fjSr .W IlIII UI A 8 gT@OFTNS21 07 1 MASSACHUSETTS INSTITUTE OF TECHNOLOGY ARTIFICIAL INTELLIGENCE LABORATORY and CENTER

  6. Apollo - FIRE Project

    NASA Technical Reports Server (NTRS)

    1963-01-01

    Schematic drawing of Project FIRE Velocity Package. This was the design of a package used for flight tests with the Atlas rockets. Project FIRE (Flight Investigation Reentry Environment) studied the effects of reentry heating on spacecraft materials. It involved both wind tunnel and flight tests, although the majority were tests with Atlas rockets and recoverable reentry packages. These flight tests took place at Cape Canaveral in Florida. Wind tunnel tests were made in several Langley tunnels including the Unitary Plan Wind Tunnel, the 8-foot High-Temperature Tunnel and the 9x6-Foot Thermal Structures Tunnel.

  7. Apollo - Project FIRE

    NASA Technical Reports Server (NTRS)

    1962-01-01

    Test of Project FIRE model in Unitary Plan Wind Tunnel. Project FIRE (Flight Investigation Reentry Environment) studied the effects of reentry heating on spacecraft materials. It involved both wind tunnel and flight tests, although the majority were tests with Atlas rockets and recoverable reentry packages. These flight tests took place at Cape Canaveral in Florida. Wind tunnel tests were made in several Langley tunnels including the Unitary Plan Wind Tunnel, the 8-foot High-Temperature Tunnel and the 9x6-Foot Thermal Structures Tunnel.

  8. Apollo - Project FIRE

    NASA Technical Reports Server (NTRS)

    1962-01-01

    Researcher checks model of Project Fire Reentry package to be tested in Unitary Plan Wind Tunnel. Project FIRE (Flight Investigation Reentry Environment) studied the effects of reentry heating on spacecraft materials. It involved both wind tunnel and flight tests, although the majority were tests with Atlas rockets and recoverable reentry packages. These flight tests took place at Cape Canaveral in Florida. Wind tunnel tests were made in several Langley tunnels including the Unitary Plan Wind Tunnel, the 8-foot High-Temperature Tunnel and the 9x6-Foot Thermal Structures Tunnel.

  9. Apollo - Project Fire

    NASA Technical Reports Server (NTRS)

    1964-01-01

    60-foot sphere used during flight tests for Project FIRE. (Shot #2): Project FIRE (Flight Investigation Reentry Environment) studied the effects of reentry heating on spacecraft materials. It involved both wind tunnel and flight tests, although the majority were tests with Atlas rockets and recoverable reentry packages. These flight tests took place at Cape Canaveral in Florida. Wind tunnel tests were made in several Langley tunnels including the Unitary Plan Wind Tunnel, the 8-foot High-Temperature Tunnel and the 9- x 6-Foot Thermal Structures Tunnel.

  10. Project LITE Spectroscopy

    NASA Astrophysics Data System (ADS)

    Weeks, E.; Brecher, K.; Carr, P.; Garik, P.

    2003-12-01

    Spectroscopy is one of the most important tools used by astronomers to disentangle information about the universe. However, it is one of the most challenging subjects in undergraduate astronomy courses. Among the most difficult concepts for students to master are Kirchhoff's laws, blackbody radiation, the Stefan-Boltzmann law, Wien's law, the nature and causes of emission and absorption lines, and the relation of spectra to the underlying astronomical and physical processes producing them. Students often seem baffled by the connection between a spectrum seen visually as a color band and the same spectrum plotted graphically as intensity versus wavelength or frequency. Project LITE (Light Inquiry Through Experiments) is a software, curriculum, and materials development project at Boston University. As part of the project, we are currently developing a suite of spectroscopic tools for astronomy education. We are also assessing their effectiveness in improving conceptual understanding of spectroscopic phenomena by astronomy students at the undergraduate level. The spectroscopy component of Project LITE includes take-home laboratory materials and experiments, which are integrated with web-based software. We have also developed a novel quantitative handheld binocular spectrometer (patent pending). Here we present an overview of the Project LITE homelab kits and curriculum, the Spectrum Explorer, and the Project LITE spectrometer. The homelab experiments and the Spectrum Explorer have been tested with students in a non-science majors introductory astronomy course as well as in a School of Education course for prospective elementary school science teachers. We present preliminary results of pre- and post-instruction surveys of student understanding of various spectral properties of light both from students who used the homelab activities and the Spectrum Explorer and those who did not. The Spectrum Explorer (along with many other applets about both the physical and

  11. Solar radiation measurement project

    NASA Technical Reports Server (NTRS)

    Ioup, J. W.

    1981-01-01

    The Xavier solar radiation measurement project and station are described. Measurements of the total solar radiation on a horizontal surface from an Eppley pyranometer were collected into computer data files. Total radiation in watt hours was converted from ten minute intervals to hourly intervals. Graphs of this total radiation data are included. A computer program in Fortran was written to calculate the total extraterrestrial radiation on a horizontal surface for each day of the month. Educational and social benefits of the project are cited.

  12. Biofuels: Project summaries

    SciTech Connect

    Not Available

    1994-07-01

    The US DOE, through the Biofuels Systems Division (BSD) is addressing the issues surrounding US vulnerability to petroleum supply. The BSD goal is to develop technologies that are competitive with fossil fuels, in both cost and environmental performance, by the end of the decade. This document contains summaries of ongoing research sponsored by the DOE BSD. A summary sheet is presented for each project funded or in existence during FY 1993. Each summary sheet contains and account of project funding, objectives, accomplishments and current status, and significant publications.

  13. Solar Dish Project

    SciTech Connect

    Robert F. Boehm

    2004-06-06

    (Original wording, now somewhat outdated.) The Nevada Solar Dish Project is designed to deploy at least 1 MW of dish-based, field validation power generation systems in a mini-power plant near Las Vegas, Nevada, as a transitional precursor to the full commercialization of the technology. This will occur over a period of about three years, from 2001 through 2004. The statement of work defines activities that the University of Nevada Las Vegas (UNLV) will provide by establishing a test site for two dish/Stirling systems on the UNLV campus and providing operation, test and training, and education in support of the project.

  14. Project Summary Report

    NASA Technical Reports Server (NTRS)

    Upchurch, Christopher

    2011-01-01

    The project, being the development of resource management applications, consisted entirely of my own effort. From deliverable requirements provided by my mentor, and some functional requirement additions generated through design reviews, It was my responsibility to implement the requested features as well as possible, given the resources available. For the most part development work consisted of database programming and functional testing using real resource data. Additional projects I worked on included some firing room console training, configuring the new NE-A microcontroller development lab network, mentoring high school CubeSat students, and managing the NE interns' component of the mentor appreciation ceremony.

  15. Human Genome Project

    SciTech Connect

    Block, S.; Cornwall, J.; Dally, W.; Dyson, F.; Fortson, N.; Joyce, G.; Kimble, H. J.; Lewis, N.; Max, C.; Prince, T.; Schwitters, R.; Weinberger, P.; Woodin, W. H.

    1998-01-04

    The study reviews Department of Energy supported aspects of the United States Human Genome Project, the joint National Institutes of Health/Department of Energy program to characterize all human genetic material, to discover the set of human genes, and to render them accessible for further biological study. The study concentrates on issues of technology, quality assurance/control, and informatics relevant to current effort on the genome project and needs beyond it. Recommendations are presented on areas of the genome program that are of particular interest to and supported by the Department of Energy.

  16. CONNECTICUT BIOFUELS TECHNOLOGY PROJECT

    SciTech Connect

    BARTONE, ERIK

    2010-09-28

    DBS Energy Inc. (“DBS”) intends on using the Connecticut Biofuels Technology Project for the purpose of developing a small-scale electric generating systems that are located on a distributed basis and utilize biodiesel as its principle fuel source. This project will include research and analysis on the quality and applied use of biodiesel for use in electricity production, 2) develop dispatch center for testing and analysis of the reliability of dispatching remote generators operating on a blend of biodiesel and traditional fossil fuels, and 3) analysis and engineering research on fuel storage options for biodiesel of fuels for electric generation.

  17. A Correlational Study Assessing the Relationships among Information Technology Project Complexity, Project Complication, and Project Success

    ERIC Educational Resources Information Center

    Williamson, David J.

    2011-01-01

    The specific problem addressed in this study was the low success rate of information technology (IT) projects in the U.S. Due to the abstract nature and inherent complexity of software development, IT projects are among the most complex projects encountered. Most existing schools of project management theory are based on the rational systems…

  18. A Semester Ecology Project

    ERIC Educational Resources Information Center

    Baskett, Russell C.

    1969-01-01

    Describes a semester-long study of microorganisms in an aquarium as performed by a beginning microbiology class. Gives results and conclusions drawn by students utilizing many ecological principles to interpret the results. Similar projects could be used from beginning high school through advanced college biology. (EB)

  19. The Legacy Project

    ERIC Educational Resources Information Center

    Moye, Johnny J.

    2012-01-01

    This article is the first in a series of articles entitled "The Legacy Project." It focuses on the lives and actions of leaders who have forged technology engineering education profession into what it is today. Members of the profession owe a debt of gratitude to these leaders. One simple way to demonstrate that gratitude is to recognize them and…

  20. Elder Abuse Awareness Project.

    ERIC Educational Resources Information Center

    Doyle, Kathleen; Morrow, Marilyn J.

    1985-01-01

    The Elder Abuse Awareness Project was undertaken: (1) to determine the incidence of abuse and neglect in seven Illinois counties; and (2) to develop, produce, and distribute educational materials on elder abuse for the service provider and for senior citizens. Results are presented and discussed. (MT)

  1. Elder Abuse Awareness Project.

    ERIC Educational Resources Information Center

    Morrow, Marilyn J.; Doyle, Kathleen

    The Elder Abuse Awareness Project was developed to determine the incidence of abuse and neglect of elderly people in several rural counties in central Illinois. A primary purpose of the study was to survey service providers as to their actual encounters with elder abuse and neglect. Each provider was asked about warning signs or cues that were…

  2. The EPA Liver Project

    EPA Science Inventory

    The v-Liver is part of a broader EPA effort on Virtual Tissues (VT) aimed at reducing the magnitude and spectrum of animal testing by integrative in silico and in vitro models, which recapitulate the properties of intact organs. The other VT projects include the Virtual Embryo (...

  3. IPAD project overview

    NASA Technical Reports Server (NTRS)

    Fulton, R. E.

    1980-01-01

    To respond to national needs for improved productivity in engineering design and manufacturing, a NASA supported joint industry/government project is underway denoted Integrated Programs for Aerospace-Vehicle Design (IPAD). The objective is to improve engineering productivity through better use of computer technology. It focuses on development of technology and associated software for integrated company-wide management of engineering information. The project has been underway since 1976 under the guidance of an Industry Technical Advisory Board (ITAB) composed of representatives of major engineering and computer companies and in close collaboration with the Air Force Integrated Computer-Aided Manufacturing (ICAM) program. Results to date on the IPAD project include an in-depth documentation of a representative design process for a large engineering project, the definition and design of computer-aided design software needed to support that process, and the release of prototype software to integrate selected design functions. Ongoing work concentrates on development of prototype software to manage engineering information, and initial software is nearing release.

  4. Project Self: Beyond Resilience.

    ERIC Educational Resources Information Center

    Hampson, June E.; Rahman, Muhammad A.; Brown, Bobbi, Jr.; Taylor, Maryellen E.; Donaldson, Carl J., Jr.

    1998-01-01

    Describes the implementation and results of Project Self, an African-American cultural identity program, in three classes of fourth graders in the Jersey City public schools. The curriculum covers cultural inheritance, interrelations among social structures (education, politics, law, religion, economics) of a culture, and problem solving for self,…

  5. WSTF electrical arc projects

    NASA Astrophysics Data System (ADS)

    Linley, Larry

    1994-09-01

    The objectives of these projects include the following: validate method used to screen wire insulation with arc tracking characteristics; determine damage resistance to arc as a function of source voltage and insulation thickness; investigate propagation characteristics of Kapton at low voltages; and investigate pyrolytic properties of polyimide insulated (Kapton) wire for low voltage (less than 35 VDC) applications. Supporting diagrams and tables are presented.

  6. The ARL Microform Project.

    ERIC Educational Resources Information Center

    Association of Research Libraries, Washington, DC.

    In 1980, a study was conducted for the Association of Research Libraries (ARL) by Information Systems Consultants (ISCI) which led to the establishment of the ARL Microform Project. Based on a three-part survey, to which a total of 848 academic, government, public, and special libraries responded, the ISCI study covered: (1) general microform…

  7. The History Computerization Project.

    ERIC Educational Resources Information Center

    Clark, David L.

    1992-01-01

    Description of the History Computerization Project, which is being developed for the exchange of information between researchers, librarians, archivists, museum curators, preservation groups, and historical societies, focuses on workshops that teach the use of computer database management for historical cataloging and research. (LRW)

  8. Science in Schools Project

    NASA Astrophysics Data System (ADS)

    Waugh, Mike

    As part of a program to increase learning and engagement in science classes 124 Victorian schools are trialing a best practice teaching model. The Science in Schools Research Project is a DEET funded project under the Science in Schools Strategy, developed in response to recent research and policy decisions at national and state levels through which literacy, numeracy and science have been identified as key priorities for learning. This major science research project aims to identify, develop and trial best practice in Science teaching and learning. The Department will then be able to provide clear advice to Victoria's schools that can be adopted and sustained to: * enhance teaching and learning of Science * enhance student learning outcomes in Science at all year levels * increase student access to, and participation in Science learning from Prep through to Year 10, and hence in the VCE as well. The nature of the SiS program will be detailed with specific reference to the innovative programs in solar model cars, robotics and environmental science developed at Forest Hill College in response to this project.

  9. The History Research Project

    ERIC Educational Resources Information Center

    Estes, Matt; Brady, Ann

    2005-01-01

    Matt Estes, a social studies teacher, mentions the main instructional goals for his students like understanding the importance of proper citation and attribution presenting the Machiavelli project that deals with the skills he wants his students to develop and the course material that must be covered. In addition, Ann Brady, a library media…

  10. The Napoleon Project.

    ERIC Educational Resources Information Center

    Bassett, Jonathan

    1995-01-01

    Describes a high school history class project designed to simultaneously teach students about Napoleon and introduce them to the practice of historical inquiry. Students viewed four data sets reflecting various aspects of Napoleon's life (e.g. military victories, domestic policy). Worksheets and writing assignments reiterated the importance of…

  11. Icosahedrons: A Multifaceted Project.

    ERIC Educational Resources Information Center

    Strazdin, Ray

    2000-01-01

    Discusses a project focusing on icosahedrons that combines geometry, structure, graphic design, animation, motion, and mechanical and freehand drawing with ancient Greek catapult mechanics. Includes directions on how to both construct a template and develop the pattern for the icosahedrons. (CMK)

  12. Project ANNA Student Survey.

    ERIC Educational Resources Information Center

    Boyd, Marjorie, Comp.; Hena, Jim, Comp.

    In reviewing the Alaskan Native Needs Assessment (Project ANNA), it was determined that one of the most important educational decision-makers was the student. This concern reflected the belief that in Alaskan Native communities, students and their desires are a potent factor in deciding which option (boarding school, boarding home program, state…

  13. AgrAbility Project

    MedlinePlus

    ... It’s About Hope AgrAbility on Twitter AgrAbility on Facebook AgrAbility on You Tube AgrAbility… It’s About Hope ... summary report available... AgrAbility Harvest Get a copy Facebook Posts National AgrAbility Project 12 hours ago Good ...

  14. The Wish Tree Project

    ERIC Educational Resources Information Center

    Brooks, Sarah DeWitt

    2010-01-01

    This article describes the author's experience in implementing a Wish Tree project in her school in an effort to bring the school community together with a positive art-making experience during a potentially stressful time. The concept of a wish tree is simple: plant a tree; provide tags and pencils for writing wishes; and encourage everyone to…

  15. Project OUTREACH Evaluation.

    ERIC Educational Resources Information Center

    Hollis, Patricia A.; Newton, Josephine K.

    Described is a 4-week summer workshop, Project OUTREACH, designed to train Head Start personnel in the knowledge and skills necessary to identify handicapped or potentially handicapped children and to develop specific teaching strategies for the preschool handicapped child. It is explained that a unique aspect of the workshop was the coordination…

  16. The Visual Identity Project

    ERIC Educational Resources Information Center

    Tennant-Gadd, Laurie; Sansone, Kristina Lamour

    2008-01-01

    Identity is the focus of the middle-school visual arts program at Cambridge Friends School (CFS) in Cambridge, Massachusetts. Sixth graders enter the middle school and design a personal logo as their first major project in the art studio. The logo becomes a way for students to introduce themselves to their teachers and to represent who they are…

  17. ACCESS Project: Final Report

    SciTech Connect

    Weller, Heiko

    2015-04-01

    The ACCESS project addressed the development, testing, and demonstration of the proposed advanced technologies and the associated emission and fuel economy improvement at an engine dynamometer and on a full-scale vehicle. Improve fuel economy by 25% with minimum performance penalties Achieve SULEV level emissions with gasoline Demonstrate multi-mode combustion engine management system

  18. The Quiet Skies Project

    ERIC Educational Resources Information Center

    Rapp, Steve

    2008-01-01

    To help promote student awareness of the connection between radio astronomy and radio frequency interference (RFI), an inquiry-based science curriculum was developed to allow high school students to determine RFI levels in their communities. The Quiet Skies Project--the result of a collaboration between the National Aeronautics and Space…

  19. Cooperative Market Research Project.

    ERIC Educational Resources Information Center

    Carels, Peter; McCullough, Lynette

    A pilot project was developed in which the Advertising and Market Research Center of the Vienna School of Economics and Business in Austria and the German Department as well as the Marketing Department of Miami University in Ohio are working together to collect market research data and formulate a market entry strategy for Roemerquelle, an…

  20. An Infants School Project.

    ERIC Educational Resources Information Center

    Greenhalgh, Lynn

    1995-01-01

    Describes a wildlife garden developed on school grounds which converted a large, derelict quadrangle into an outdoor classroom used by staff across the curriculum. The area was divided into various habitats including ponds, mini-woodlands, herb garden, hedgerows, wildflower meadow, and bird borders. Preparatory work and projects generated are…

  1. Florida Teletraining Project.

    DTIC Science & Technology

    1994-01-01

    project staff at the origination site, ( e ) technical and production teams, and (f) military personnel including subject matter experts (SMEs), on...167 E . Tables from Objective BI .................................. 172 F. Tables from Objective B3...related to the instruction, (d) results of the data related to the community colleges, ( e ) results of the cost analysis, and (f) summary and

  2. Campus Energy Management Projects.

    ERIC Educational Resources Information Center

    Welzenbach, Lanora, Ed.

    This publication is a compilation of data concerning energy conservation measures at more than 60 colleges and universities in the United States and Canada. The data are presented for the information of all who are interested in the variety of ways in which institutions of higher education are managing energy. Project descriptions are divided into…

  3. Occupant Protection Project

    NASA Technical Reports Server (NTRS)

    Bopp, Genie; Somers, Jeff; Granderson, Brad; Gernhardt, Mike; Currie, Nancy; Lawrence, Chuck

    2010-01-01

    Topics include occupant protection overview with a focus on crew protection during dynamic phases of flight; occupant protection collaboration; modeling occupant protection; occupant protection considerations; project approach encompassing analysis tools, injury criteria, and testing program development; injury criteria update methodology, unique effects of pressure suits and other factors; and a summary.

  4. Project: Occupational Orientation

    ERIC Educational Resources Information Center

    Witczak, Lois A.; Ehlers, Dorothy

    1970-01-01

    Describes project undertaken during school year in an attempt to help students better identify with the world of work while still in high school. Students explored entry job opportunities and requirements in the metropolitan Washington area. The object was to show them job possibilities they never dreamed of. (Author)

  5. Life Skills Project

    ERIC Educational Resources Information Center

    Schwartz, Sunny

    2005-01-01

    In this article, the author describes the San Francisco Sheriff's Department (SFSD) Life Skills for Prisoners Program. The program was designed to enhance and expand the Resolve to Stop the Violence Project, which had operated successfully for three years in the San Francisco County Jail as a restorative justice program. The mission of SFSD is to…

  6. Summary of Project STRIVE.

    ERIC Educational Resources Information Center

    1972

    The Adult Learning Program Service (ALPS) is proposed by the Corporation for Public Broadcasting. It is an effort to involve public television in providing needed educational services to adults who have never completed high school but who have at least a sixth-grade reading level capability. STRIVE is the first in a series of projects. Its…

  7. Teacher-Training Projects

    ERIC Educational Resources Information Center

    Greer, Leslie

    1977-01-01

    The Sociedade Brasileira de Cultura Inglesa of Sao Paolo, Brazil, is an English teaching center which also runs an introductory course to train teachers of English. This article describes some of the projects completed by prospective teachers; they include language games, pictures, cartoons, role-playing and writing creative dialogue. (CHK)

  8. Praise Acres Project

    ERIC Educational Resources Information Center

    Hayes, Carolyn

    2004-01-01

    In this article, the author presents the "Praise Acres Project," which was initiated from a letter written by a local resident. The resident wrote about an idea to develop a wetlands and outdoor lab facility on his property for students. Thus, a plan was conceived that would not only benefit the owner, but also enhance high school science…

  9. Solar photovoltaic residential project

    NASA Astrophysics Data System (ADS)

    1981-10-01

    Progress with technology transfer and the performance of photovoltaic power supplies in Northeastern and Southwestern residences are reported. Also, systems operation in Florida and Hawaii are discussed briefly. Technology development in the field of power conditioning and flywheel storage is described. Work on some non-residential field tests is also described. Project management data are summarized.

  10. The Ethiopian Orphanage Project

    ERIC Educational Resources Information Center

    LaVecchia, Antoinette

    2010-01-01

    The Ethiopian Orphanage Project was the brainchild of a prominent pediatrician who, through her foundation and private practice, has been saving the physical and emotional lives of children for years, both in the United States and abroad, with a focus on HIV+ orphans in developing countries. Three years ago, after introducing ARVs (antiretroviral…

  11. Apollo Project- star projector

    NASA Technical Reports Server (NTRS)

    1964-01-01

    The specially designed star projector used in the Projection Planetarium. From A.W. Vogeley, 'Piloted Space-Flight Simulation at Langley Research Center,' Paper presented at the American Society of Mechanical Engineers, 1966 Winter Meeting, New York, NY, November 27 - December 1, 1966. 'Another approach to the scene-generation problem is the point-light-source projection technique. This technique has been used in the Langley Projection Planetarium,... to study Apollo launch-abort problems. This method was very effective in providing the required horizon-to-horizon view of Florida as seen from about 100,000 feet.' 'This projector operates on a concept developed by Spitz. It consists of a point-light source reflecting off a centrally located highly reflective sphere which directs the light outward through the many holes representing the stars. The size of the holes is varied to vary star magnitude. The star images are brought into focus on the inside of the planetarium by lenses glued to the surface of the projector and the diameter of the projection sphere govern the focal length required for these lenses. Although this type of projector does not have the precision required for the study of navigation problems it is very adequate for pilot control problems such as rendezvous where the star field is primarily used as an attitude reference.'

  12. Eagle Writing Project.

    ERIC Educational Resources Information Center

    Davis, Thomas

    1995-01-01

    Describes a Wyoming junior high school teacher's expansion of a library research assignment to an Eagle Writing Project stressing practical skills applications, including critical thinking, listening, note taking, reviewing, respecting different opinions, communicating with government officials, writing as a practical tool, and respecting the…

  13. Cognitive Education Project.

    ERIC Educational Resources Information Center

    Mulcahy, Robert; And Others

    The Cognitive Education Project centered at the University of Alberta undertook a 3-year longitudinal evaluation of two cognitive education programs aimed at teaching thinking skills. The critical difference between the two experimental programs was that one, Feuerstein's Instrumental Enrichment (IE) method was taught out of curricular content,…

  14. Language Arts Project.

    ERIC Educational Resources Information Center

    New Mexico Western States Small Schools Project, Santa Fe.

    The 1963 language arts project in Wagon Mound, New Mexico, was designed to make administrators and teachers aware of and concerned about the problems of teaching English to Spanish-speaking children in grades 1-12. General and specific objectives and instructional techniques stressed improvement of oral and written communication. An analysis of…

  15. Directory of Projects, 1997.

    ERIC Educational Resources Information Center

    National Inst. on Early Childhood Development and Education (ED/OERI), Washington, DC.

    The National Institute on Early Childhood Development and Education (ECI) was established by the U.S. Department of Education to carry out a comprehensive program of research, development, and dissemination to improve young children's learning and development. This directory contains information on the programs and projects funded by ECI in fiscal…

  16. Final Year Project Report

    SciTech Connect

    Hubsch, Tristan

    2013-06-20

    In the last years of this eighteen-year grant project, the research efforts have focused mostly on the study of off-shell representations of supersymmetry, both on the worldline and on the world- sheet, i.e., both in supersymmetric quantum mechanics and in supersymmetric field theory in 1+1-dimensional spacetime.

  17. Projectable Basic Electronics Kit.

    ERIC Educational Resources Information Center

    H'ng, John; And Others

    1982-01-01

    Outlines advantages derived from constructing and using a Projectable Basic Electronics Kit and provides: (1) list of components; (2) diagrams of 10 finished components (resistor; capacitor; diode; switch; bulb; transistor; meter; variable capacitor; coil; connecting terminal); and (3) diode and transistor activities. (JN)

  18. California Project Talent.

    ERIC Educational Resources Information Center

    Plowman, Paul D., Comp.; Rice, Joseph P., Comp.

    A compilation of presentations on programs for the gifted includes the following: increasing opportunities for education, notes on Project Talent, talent development and national goals, talent identification in California, problems and recommendations in the area of the talented, innovations in talent development, issues and problems in modern…

  19. Spanish Literacy Investigation Project.

    ERIC Educational Resources Information Center

    Cook, Jacqueline; Quinones, Anisia

    The Spanish Literacy Investigation Project was implemented to identify adult Spanish literacy programs throughout the country, to explore the availability of relevant Spanish literacy teaching methods, to determine relevant elements between Spanish literacy and English as a Second Language (ESL), and to describe a model for incorporating a Spanish…

  20. The RMIT Wuhan Project.

    ERIC Educational Resources Information Center

    Silver, Alan

    In March 1995, Australia's Royal Melbourne Institute of Technology began offering Australian and Chinese students an Associate Diploma of Business in International Trade at the Wuhan Yejin University of Science and Technology, in China. The course is offered at the University's China Iron and Steel Industry Training Centre, a joint project between…

  1. Meteorology: Project Earth Science.

    ERIC Educational Resources Information Center

    Smith, P. Sean; Ford, Brent A.

    This document on meteorology is one of a four-volume series of Project Earth Science that includes exemplary hands-on science and reading materials for use in the classroom. This book is divided into three sections: activities, readings, and appendix. The activities are constructed around three basic concept divisions. First, students investigate…

  2. The Starlite Project

    DTIC Science & Technology

    1990-09-01

    project is to create an operating system generator that could automatically select implementations from a module library based on specified...software backplane. Also, we felt that some composition mechanism is be necessary to achieve the goal of creating an operating system generator . The

  3. Projecting California's Fiscal Future.

    ERIC Educational Resources Information Center

    Carroll, Stephen; And Others

    This paper presents findings of a study that analyzed the trends that will shape the California budget over the next decade. The study assumed that current demographic and economic trends, tax policies, and mandated spending programs will continue through the next decade, and projects their implications for state general-fund revenues and spending…

  4. No Easy Project

    ERIC Educational Resources Information Center

    Keller, Bess

    2007-01-01

    Feeling stifled at his old school, Timothy S. Cagwin, a 39-year-old English teacher, was particularly attracted to a new schools' plans to focus on "project-based learning," a pedagogical approach high on the list of high-school-reform ideas championed by the Bill & Melinda Gates Foundation and other like-minded philanthropies, academics, and…

  5. Science Education Improvement Project.

    ERIC Educational Resources Information Center

    National Science Foundation, New Delhi (India).

    The report covers the activities of the Indian Science Improvement Project during the calendar year 1970. The major emphasis is on curriculum development activities. Topics covered include elementary and secondary school science programs, traveling science workshop, college science improvement program, special college/university program, technical…

  6. Partner Project. Final Report.

    ERIC Educational Resources Information Center

    Arizona Univ., Tucson. Dept. of Special Education.

    The study investigated the effectiveness of the Partner Project, a participation strategy on the participation of learning disabled high school students and their parents during the annual individualized education program (IEP) conference. Eleven students and their parents received the IEP participation strategy training which focused on…

  7. The Herpetology Project

    ERIC Educational Resources Information Center

    Vacchina, Peter; Aguirre, Mary

    2008-01-01

    In this article, the authors describe their ongoing experience with the Herpetology Project. Through this field study, students catch and track amphibians and reptiles in the Assabet River area, record and analyze data, share their findings with the community, and ultimately, work toward protecting turtles' habitats. The authors chose to focus on…

  8. Project "Hypertension Alert."

    ERIC Educational Resources Information Center

    Sailors, Emma Lou

    1983-01-01

    "Hypertension Alert," a 1979-80 blood pressure screening-awareness project of the Yonkers, New York Public Schools, is described. Data is analyzed in tables for ethnic composition, and range of blood pressure readings for the high school, junior high school, and elementary school students tested. (Author/JMK)

  9. Substance Use Prevention Project.

    ERIC Educational Resources Information Center

    Simmons, Judy

    This report outlines the Hillsborough County, Florida, Head Start Program's project to field test with young children and their families curricula that were designed to prevent alcohol and other drug problems. A national search conducted by means of computers, individual contacts, and other methods yielded information on 22 substance abuse…

  10. Project-Based Science

    ERIC Educational Resources Information Center

    Krajcik, Joe

    2015-01-01

    Project-based science is an exciting way to teach science that aligns with the "Next Generation Science Standards" ("NGSS"). By focusing on core ideas along with practices and crosscutting concepts, classrooms become learning environments where teachers and students engage in science by designing and carrying out…

  11. Project Choice: Lessons Learned.

    ERIC Educational Resources Information Center

    Ewing Marion Kauffman Foundation, Kansas City, MO.

    Project Choice began with a simple goal: to increase the number of inner-city students who graduate from high school on time and become productive members of society. To that end, Ewing M. Kauffman, his Foundation, and associates designed and implemented a program that promised postsecondary education or training to some students in the Kansas…

  12. Meteor Beliefs Project: Introduction

    NASA Astrophysics Data System (ADS)

    McBeath, A.; Gheorghe, A. D.

    2003-05-01

    A new project to investigate beliefs in meteors and meteoric phenomena in past and present times using chiefly folklore, mythology, prose and poetic literature, is described. Some initial examples are given, along with a bibliography of relevant items already in print in IMO publications.

  13. West Hackberry Tertiary Project

    SciTech Connect

    Gillham, Travis; Yannimaras, Demetrios

    1999-11-03

    The West Hackberry Tertiary Project is a field test of the concept that air injection can generate tertiary oil recovery through the Double Displacement Process. The Double Displacement Process is the gas displacement of a water invaded oil column for the purpose of recovering tertiary oil through gravity drainage. The novel aspect of this project is the use of air as the injection fluid. In Gulf Coast oil reservoirs with pronounced bed dip, reservoir performance has shown that gravity drainage recoveries average 80% to 90% of the original oil in place while water drive recoveries average 50% to 60% of the original oil in place. The target for tertiary oil recovery with the Double Displacement Process is the incremental oil between the 50% to 60% water drive recoveries and the 80% to 90% gravity drainage recoveries. The use of air injection in this process combines the benefits of air's low cost and universal accessibility with the potential for improved oil recovery resulting from spontaneous in situ combustion. If successful, this project will demonstrate that utilizing air injection in the Double Displacement Process will result in an economically viable tertiary process in many Gulf Coast oil reservoirs where other tertiary processes are presently uneconomic. The West Hackberry Tertiary Project receives matching funds from the United States Department of Energy (DOE) as part of the DOE's Class 1 Program for the development of advance recovery technologies in fluvial dominated deltaic reservoirs. In addition, the Petroleum Engineering Department at Louisiana State University (LSU) provides independent study and technology transfer.

  14. The MERMAID project

    NASA Technical Reports Server (NTRS)

    Cowderoy, A. J. C.; Jenkins, John O.; Poulymenakou, A

    1992-01-01

    The tendency for software development projects to be completed over schedule and over budget was documented extensively. Additionally many projects are completed within budgetary and schedule target only as a result of the customer agreeing to accept reduced functionality. In his classic book, The Mythical Man Month, Fred Brooks exposes the fallacy that effort and schedule are freely interchangeable. All current cost models are produced on the assumption that there is very limited scope for schedule compression unless there is a corresponding reduction in delivered functionality. The Metrication and Resources Modeling Aid (MERMAID) project, partially financed by the Commission of the European Communities (CEC) as Project 2046 began in Oct. 1988 and its goal were as follows: (1) improvement of understanding of the relationships between software development productivity and product and process metrics; (2) to facilitate the widespread technology transfer from the Consortium to the European Software Industry; and (3) to facilitate the widespread uptake of cost estimation techniques by the provision of prototype cost estimation tools. MERMAID developed a family of methods for cost estimation, many of which have had tools implemented in prototypes. These prototypes are best considered as toolkits or workbenches.

  15. The Castle Project

    SciTech Connect

    Tom Anderson; David Culler; James Demmel; Jerry Feldman; Susan Graham; Paul Hilfinger; Katherine Yelick

    2000-02-16

    The goal of the Castle project was to provide a parallel programming environment that enables the construction of high performance applications that run portably across many platforms. The authors approach was to design and implement a multilayered architecture, with higher levels building on lower ones to ensure portability, but with care taken not to introduce abstractions that sacrifice performance.

  16. The Human Toxome Project

    EPA Science Inventory

    The Human Toxome project, funded as an NIH Transformative Research grant 2011--‐ 2016, is focused on developing the concepts and the means for deducing, validating, and sharing molecular Pathways of Toxicity (PoT). Using the test case of estrogenic endocrine disruption, the respo...

  17. Manufacturing Education Curriculum Project.

    ERIC Educational Resources Information Center

    Umstattd, William D.

    The Manufacturing Education Curriculum Project's feasibility study concerned with industrial arts curriculum development in manufacturing for the senior high school level is described. The need for an industrial arts curriculum which meets and reflects present and future trends is discussed in the introduction, followed by a review of the…

  18. An Interdisciplinary Microprocessor Project.

    ERIC Educational Resources Information Center

    Wilcox, Alan D.; And Others

    1985-01-01

    Describes an unusual project in which third-year computer science students designed and built a four-bit multiplier circuit and then combines it with software to complete a full 16-bit multiplication. The multiplier was built using TTL components, interfaced with a Z-80 microprocessor system, and programed in assembly language. (JN)

  19. Digging into Archaeology Projects.

    ERIC Educational Resources Information Center

    Grambo, Greg

    1996-01-01

    Suggestions are offered for a classroom project of planning and conducting an archaeological dig on or near school property. Principles of archaeological practice such as making drawings of the site and using a grid frame to record locations are explained. Also suggested is a simulation activity in which students pick imbedded "findings" out of…

  20. The Iron Project

    NASA Technical Reports Server (NTRS)

    Pradhan, Anil K.

    2000-01-01

    Recent advances in theoretical atomic physics have enabled large-scale calculation of atomic parameters for a variety of atomic processes with high degree of precision. The development and application of these methods is the aim of the Iron Project. At present the primary focus is on collisional processes for all ions of iron, Fe I - FeXXVI, and other iron-peak elements; new work on radiative processes has also been initiated. Varied applications of the Iron Project work to X-ray astronomy are discussed, and more general applications to other spectral ranges are pointed out. The IP work forms the basis for more specialized projects such as the RmaX Project, and the work on photoionization/recombination, and aims to provide a comprehensive and self-consistent set of accurate collisional and radiative cross sections, and transition probabilities, within the framework of relativistic close coupling formulation using the Breit-Pauli R-Matrix method. An illustrative example is presented of how the IP data may be utilized in the formation of X-ray spectra of the K alpha complex at 6.7 keV from He-like Fe XXV.

  1. Project PRISM: Parent Information.

    ERIC Educational Resources Information Center

    Cunnion, Maryellen; And Others

    The second of three documents on Project PRISM, a program designed to help middle school classroom teachers provide for the needs of gifted and talented students without removing them from the mainstream, notes guidelines for parents. The following topics are addressed (sample subtopics in parentheses): characteristics of the gifted (common myths…

  2. A Helical Stairway Project

    ERIC Educational Resources Information Center

    Farmer, Tom

    2008-01-01

    We answer a geometric question that was raised by the carpenter in charge of erecting helical stairs in a 10-story hospital. The explanation involves the equations of lines, planes, and helices in three-dimensional space. A brief version of the question is this: If A and B are points on a cylinder and the line segment AB is projected radially onto…

  3. Project Catch-Up.

    ERIC Educational Resources Information Center

    Newport-Mesa Unified School District, Newport Beach, CA.

    Now in the 17th year of operation, this project is a laboratory program designed to provide remedial instruction to improve the achievement in reading and/or mathematics skills of children who test in the lowest quartile in these areas. Classroom and laboratory teachers work closely together to identify potential program participants and formulate…

  4. The Radio Jove Project

    NASA Technical Reports Server (NTRS)

    Thieman, J. R.

    2010-01-01

    The Radio love Project is a hands-on education and outreach project in which students, or any other interested individuals or groups build a radio telescope from a kit, operate the radio telescope, transmit the resulting signals through the internet if desired, analyze the results, and share the results with others through archives or general discussions among the observers. Radio love is intended to provide an introduction to radio astronomy for the observer. The equipment allows the user to observe radio signals from Jupiter, the Sun, the galaxy, and Earth-based radiation both natural and man-made. The project was started through a NASA Director's Discretionary Fund grant more than ten years ago. it has continued to be carried out through the dedicated efforts of a group of mainly volunteers. Dearly 1500 kits have been distributed throughout the world. Participation can also be done without building a kit. Pre-built kits are available. Users can also monitor remote radio telescopes through the internet using free downloadable software available through the radiosky.com website. There have been many stories of prize-winning projects, inspirational results, collaborative efforts, etc. We continue to build the community of observers and are always open to new thoughts about how to inspire the observers to still greater involvement in the science and technology associated with Radio Jove.

  5. The Habitat Project

    ERIC Educational Resources Information Center

    Hein, Annamae J.

    2011-01-01

    The Habitat Project is a multiday, differentiated, interdisciplinary environmental science lesson that incorporates skill-building and motivational strategies to internalize ecosystem vocabulary. Middle school students research an animal, display its physical characteristics on a poster, build a three-dimensional habitat and present their work…

  6. The Shakespeare Project.

    ERIC Educational Resources Information Center

    Friedlander, Larry

    1986-01-01

    This paper describes the Shakespeare Project, an interactive videodisk computer program developed at Stanford University which permits students to study, design, and enjoy theater. The prototype consists of three basic programs, which are described in detail: (1) a videodisk-based "tutorial" called "Page to Stage," that teaches…

  7. WSTF electrical arc projects

    NASA Technical Reports Server (NTRS)

    Linley, Larry

    1994-01-01

    The objectives of these projects include the following: validate method used to screen wire insulation with arc tracking characteristics; determine damage resistance to arc as a function of source voltage and insulation thickness; investigate propagation characteristics of Kapton at low voltages; and investigate pyrolytic properties of polyimide insulated (Kapton) wire for low voltage (less than 35 VDC) applications. Supporting diagrams and tables are presented.

  8. Climate Change Schools Project...

    ERIC Educational Resources Information Center

    McKinzey, Krista

    2010-01-01

    This article features the award-winning Climate Change Schools Project which aims to: (1) help schools to embed climate change throughout the national curriculum; and (2) showcase schools as "beacons" for climate change teaching, learning, and positive action in their local communities. Operating since 2007, the Climate Change Schools…

  9. The Lighthouse Project.

    ERIC Educational Resources Information Center

    LeRose, Barbara; And Others

    1979-01-01

    The project is based on a general systems approach. Developmental stage theory is employed as a starting point, and the developmental "minitasks" which act as stair risers from one developmental level to another are carried through with the use of Bloom's cognitive taxonomy. (Author/DLS)

  10. Baltimore applications project

    NASA Technical Reports Server (NTRS)

    Golden, T. S.; Yaffee, P.

    1979-01-01

    An update is presented for the following projects: (1) asphalt pavement recycling; (2) data collection platform/water quality monitoring; (3) digital emergency traffic routing; (4) fire department communications and dispatch system; (5) health department management information system; (6) hazardous materials; (7) coal gasification; and (8) emergency vehicle proximity sensing.

  11. ISOE Pilot Project Update

    SciTech Connect

    D. A. Hagemeyer D. E. Lewis

    2012-05-05

    This slide show introduces the Pilot Project to increase the value of Information System on Occupational Exposure (ISOE) data by increasing participation and amount of data reported from the U.S., reduce the hurdles and effort in participating, streamline the process of reporting and reduce time delay, and eliminate data entry and redundant effort.

  12. The Barriers Project.

    ERIC Educational Resources Information Center

    Confederation Coll. of Applied Arts and Technology, Thunder Bay (Ontario).

    In 1987, the Barriers Project was initiated by Confederation College of Applied Arts and Technology to engage 31 selected community colleges in Canada in an organized self-appraisal of institutional barriers to the enrollment of part-time credit students. From the outset, colleges were encouraged to limit their investigation to barriers over which…

  13. Weekend Science Project

    ERIC Educational Resources Information Center

    Santos, Karey

    2012-01-01

    Weekend plans...every family has them. Whether it's fishing, swimming, or simply picnicking by the river, water plays a significant role in many recreational endeavors. Encouraging students and their families to use their "scientific eyes" to explore these wonderful wet places is what Weekend Science Project is all about. Weekend Science Project…

  14. Princeton VLSI project

    NASA Astrophysics Data System (ADS)

    Lipton, R. J.

    1983-12-01

    There are three major aspects to our project. The first concerns the development of a procedural approach to the layout of VLSI circuits. The second is the continuing investigation of the census language. Finally, the third is in the area of VLSI circuits.

  15. Princeton VLSI project

    NASA Astrophysics Data System (ADS)

    Lipton, R. J.

    1983-12-01

    There are three major aspects to our project. The first concerns the development of ALI2 which is a procedural language approach to the layout of VLSI circuits. The second is the continuing investigation of the census language. Finally, the third is in the area of testing of VLSI circuits.

  16. Project: Taking Off

    ERIC Educational Resources Information Center

    Duncan, Karen

    1975-01-01

    The project's objectives include helping obese students understand their problem in ways that are relevant, interesting, creative, yet academic, and wiping out the pathetic prophecies and painful experiences concerned with obesity in children and teenagers. Concise objectives of the program's educational component and definition of areas of…

  17. The European Project TILA

    ERIC Educational Resources Information Center

    Jauregi, Kristi; Melchor-Couto, Sabela; Beltrán, Elina Vilar

    2013-01-01

    Telecollaboration for Intercultural Language Acquisition (TILA), is an EU-funded project within the Lifelong Learning Programme that will run between January 2013 and June 2015. TILA's overall objectives are: (1) to innovate, enrich and make foreign language teaching programmes more attractive and effective by encouraging the implementation of…

  18. Evaluation of Project Trend.

    ERIC Educational Resources Information Center

    Unco, Inc., Washington, DC.

    This report is a descriptive evaluation of the five pilot sites of Project TREND (Targeting Resources on the Educational Needs of the Disadvantaged). The five Local Education Agency (LEA) pilot sites are the educational systems of: (1) Akron, Ohio; (2) El Paso, Texas; (3) Newark, New Jersey; (4) Portland, Oregon; and, (5) San Jose (Unified),…

  19. The Pumpkin Project

    ERIC Educational Resources Information Center

    Hardman, Bonnie

    2005-01-01

    Ms. Hardman's group of special education students were supposed to be "difficult." But their engagement in a novel interdisciplinary project had a transformative effect -- on them, on their teachers, and even on individuals far beyond their school. This article describes children and their experiences in a special education class and how they…

  20. These Projects are WINNERS!

    ERIC Educational Resources Information Center

    Levi, Tricia

    1995-01-01

    Describes the winners of the Prentice Hall/National Middle School Association Teaching Team Awards (established to recognize exceptional interdisciplinary projects by middle school teaching teams). Students designed a new school, simulated a journey over the Oregon trail, conducted oral histories, and turned a local river into a learning…

  1. The Great Mathematician Project

    ERIC Educational Resources Information Center

    Goldberg, Sabrina R.

    2013-01-01

    The Great Mathematician Project (GMP) introduces both mathematically sophisticated and struggling students to the history of mathematics. The rationale for the GMP is twofold: first, mathematics is a uniquely people-centered discipline that is used to make sense of the world; and second, students often express curiosity about the history of…

  2. Russian Language Analysis Project

    ERIC Educational Resources Information Center

    Serianni, Barbara; Rethwisch, Carolyn

    2011-01-01

    This paper is the result of a language analysis research project focused on the Russian Language. The study included a diverse literature review that included published materials as well as online sources in addition to an interview with a native Russian speaker residing in the United States. Areas of study include the origin and history of the…

  3. Project Ranger Curriculum Guide.

    ERIC Educational Resources Information Center

    Fox, Carla; And Others

    The objective of Project Ranger is to improve school behavior and academic performance of selected, primarily "disruptive," students who are failing in the traditional school program. The Ranger curriculum uses the outdoor environment as the medium for improving student self-concept and relations with peers and adults and for providing…

  4. Positive Disciplinary Project.

    ERIC Educational Resources Information Center

    Rudolph, David D.

    Maryland's Perryville High School Positive Disciplinary Project involves both actively disruptive students referred by the administration and students who have demonstrated the potential to be disruptive who are referred by teachers, guidance counselors, or parents. In either instance, the student becomes a part of the program for the entire…

  5. Transnational Spanish Language Project.

    ERIC Educational Resources Information Center

    Gavillan, Eva; And Others

    The Transnational Spanish Language Project curriculum is a set of instructional materials designed to enhance intercultural business communication between North American and Spanish American cultures. The curriculum covers three areas: office procedures; banking; and import/export business. Lessons, all in Spanish, are intended for…

  6. Project ACORDE. Final Report.

    ERIC Educational Resources Information Center

    Kelley, Marjorie L.

    A report is presented on the evaluation and redevelopment of an 11-module course of instruction in restorative dentistry conducted under Project Acorde. The major learning goals for students were: acquisition of the necessary skills and knowledge of appropriate tools and materials; and self-appraisal of one's own work in performing the various…

  7. Project Final Report

    NASA Technical Reports Server (NTRS)

    Ciolkosz, Daniel; Albright, Louis

    1999-01-01

    The initial focus of this GSRP project was to model and develop systems for optimized use of the Microwave lamp for use in bioregenerative life support systems (BLSS). The microwave lamp, which has been developed for use in BLSS as part of a NASA small business innovation research (SBIR) grant, exhibits a number of characteristics that make it an excellent candidate for use in BLSS. However, we decided to shift the focus of the project, after discussions with scientists at KSC, to a broader question. Specifically, we decided to investigate the possibility of developing a decision tool for characterizing overall fighting system effectiveness in a plant growth system. It seemed pointless to optimize a microwave lamp for BLSS when there was no good way to decide what exactly an optimized system would look like. The problem is a complex one, involving multiple, conflicting objectives with irreconcilable units, significant constraints, and a wide range of relative importance among the objectives. The project would involve not only characterizing this complex decision process, but also would require some investigations into the physical properties of the lighting systems being considered. Thus, we turned to the field of Decision Modeling as a means of meeting this objective. After a thorough investigation of the literature, a technique was chosen and carefully developed. Implementation and analysis of the system are still in progress, and should be completed during the summer of 1999. Ancillary studies, which were conducted in the course of the project, have also been conducted, and are summarized below.

  8. SERT C project study

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The SERT C (Space Electric Rocket Test - C) project study defines a spacecraft mission that would demonstrate the technology readiness of ion thruster systems for primary propulsion and station keeping applications. As a low cost precursor, SERT C develops the components and systems required for subsequent Solar Electric Propulsion (SEP) applications. The SERT C mission requirements and preliminary spacecraft and subsystem design are described.

  9. Project Kid-Save.

    ERIC Educational Resources Information Center

    Benson, Stephen A.; And Others

    1996-01-01

    Describes Project Kid-Save, a program designed by Arizona's Monument Valley High School to provide a safety net for failing students and to support adoption of the North Central Association's outcomes accreditation approach. Reviews the program's five components and evaluates the relative success of each. (11 citations) (MAB)

  10. The Ashby Project Week

    ERIC Educational Resources Information Center

    Tomlinson, M. J.; Daniels, D. J.

    1974-01-01

    Discusses the offering of a residential project course for students in 1972 and a similar course for teachers in 1973 at the Grammar School, Ashby-de-la-Zouch, Leicestershire. Included are descriptions of participants reactions and course objectives and topics. (CC)

  11. Careers Booklet. Project SEARCH.

    ERIC Educational Resources Information Center

    Heart of the Earth Survival School, Minneapolis, MN.

    Developed by the staff of Project SEARCH, this booklet is designed to assist American Indian adults of the Minneapolis-St. Paul area in an exploration of careers. As noted by the introduction, it may also be of interest to Indian high school students, college students, and others who are looking for ideas about the kinds of careers available. The…

  12. COVERT PROJECT, YEAR 1.

    ERIC Educational Resources Information Center

    KLEIN, GENEVIEVE; AND OTHERS

    A TUCSON EDUCATIONAL PROJECT, CALLED COVERT (CHILDREN OFFERED VITAL EDUCATIONAL RETRAINING AND THERAPY), HAS BEEN PROPOSED TO IMPROVE THE EDUCATIONAL OPPORTUNITY OF EMOTIONALLY DISTURBED CHILDREN. SURVEYS INDICATE THAT FROM 5 TO 14 PERCENT OF TUCSON'S SCHOOL CHILDREN HAVE EMOTIONAL-BEHAVIORAL PROBLEMS WHICH INTERFERE WITH THEIR LEARNING…

  13. The China Project.

    ERIC Educational Resources Information Center

    Gross, Steve; Juefei, Wang

    1991-01-01

    Nearly half of all Vermont school districts have participated in the China Project since its inception in 1986. During the program's first two years, participants examined Chinese history, politics, economy, geography, philosophy, arts, ancient inventions, foreign policy, social life, women's social status, the Chinese language, and the Beijing…

  14. BC Medication Management Project

    PubMed Central

    Henrich, Natalie; Tsao, Nicole; Gastonguay, Louise; Lynd, Larry

    2015-01-01

    Background: The BC Medication Management Project (BCMMP) was developed by the BC Ministry of Health and the BC Pharmacy Association. This pilot project ran from September 2010 to January 2012. Pharmacists reviewed patients’ medication histories, discussed best use of medications, provided education and monitored for adverse effects, developed a plan to deal with medication issues and created a best possible medication history. Methods: To evaluate the experience of participating in the BCMMP, challenges and strengths of the project and the alignment of these experiences with the overarching goals, focus groups and interviews were conducted with 6 stakeholder groups. Themes were compared within and across stakeholder type and descriptively analyzed. Results: A total of 88 people participated in the focus groups/interviews. Pharmacists stated that providing BCMMP services was professionally satisfying and concurred with patients that the service did benefit them. However, participating in the BCMMP was not seen as financially sustainable by pharmacy owners, and there were concerns about patient selection. Physicians expressed concerns about increased workload associated with the BCMMP, for which they were not compensated. The computer system and burden of documentation were identified as the greatest problems. Conclusions: The BCMMP pilot project was enthusiastically received by pharmacists and patients who felt that it benefited patients and moved the pharmacy profession in a positive direction. It was widely felt that the BCMMP could be successful and sustainable if the identified challenges are addressed. PMID:25983759

  15. Stock Market Project.

    ERIC Educational Resources Information Center

    Distel, Brenda D.

    This project is designed to teach students the process of buying stocks and to tracking their investments over the course of a semester. The goals of the course are to teach students about the relationships between conditions in the economy and the stock market; to predict the effect of an economic event on a specific stock or industry; to relate…

  16. The Crime Lab Project.

    ERIC Educational Resources Information Center

    Hein, Annamae J.

    2003-01-01

    Describes the Crime Lab Project, which takes an economical, hands-on, interdisciplinary approach to studying the career of forensics in the middle or high school classroom. Includes step-by-step student requirements for the investigative procedure, a sample evidence request form, and an assessment rubric. (KHR)

  17. The Puente Project.

    ERIC Educational Resources Information Center

    Meznek, James; And Others

    The Puente Project is a statewide program that helps Mexican American/Latino community college students in California achieve their academic goals. Puente's goals are to reduce the number of Mexican American/Latino community college students who drop out of school and increase the number who transfer to four-year institutions. To meet these goals,…

  18. Concurrent Software Engineering Project

    ERIC Educational Resources Information Center

    Stankovic, Nenad; Tillo, Tammam

    2009-01-01

    Concurrent engineering or overlapping activities is a business strategy for schedule compression on large development projects. Design parameters and tasks from every aspect of a product's development process and their interdependencies are overlapped and worked on in parallel. Concurrent engineering suffers from negative effects such as excessive…

  19. MAIZE ALLELIC DIVERSITY PROJECT

    Technology Transfer Automated Retrieval System (TEKTRAN)

    Of the estimated 250-300 races of maize, only 24 races are represented in materials utilized by the Germplasm Enhancement of Maize (GEM) project, a collaborative effort between USDA-ARS and public and private sector research scientists. This is largely a result of poor performance of many races in ...

  20. Integrative Cardiac Health Project

    DTIC Science & Technology

    2011-09-01

    reported reduction in CIMT progression, 27 but not regression. Weight loss after bariatric surgery was associated with three- fold less CIMT...bypass surgery . A third goal: c) to determine the correlation of the ICHP score with coronary calcium progression as measured in the PACC rescan project

  1. Literacy Projects in Libraries.

    ERIC Educational Resources Information Center

    Gaughan, Karen K.

    1986-01-01

    Literacy Volunteers of America is described as a grassroots effort that has grown to national proportions. An overview of its development and case studies of library literacy projects in various states are provided, and recommendations are made for continued and future library participation in the literacy effort. (EM)

  2. The Button Project

    ERIC Educational Resources Information Center

    Armstrong, Charley

    2005-01-01

    In this article, the author describes The Button Project. It started as a dream, a need to educate future generations about the Holocaust, to teach tolerance, and to remember the past. Under the auspices of the Jewish Federation of Peoria, a small band of people joined together with the goal of teaching people about the Holocaust so that it will…

  3. Interstate Electrification Improvement Project

    SciTech Connect

    Puckette, Margaret; Kim, Jeff

    2015-07-01

    The Interstate Electrification Improvement Project, publicly known as the Shorepower Truck Electrification Project (STEP), started in May 2011 and ended in March 2015. The project grant was awarded by the Department of Energy’s Vehicles Technology Office in the amount of $22.2 million. It had three overarching missions: 1. Reduce the idling of Class 8 tractors when parked at truck stops, to reduce diesel fuel consumption and thus U.S. dependence on foreign petroleum; 2. Stimulate job creation and economic activity as part of the American Reinvestment and Recovery Act of 2009; 3. Reduce greenhouse gas emissions (GHG) from diesel combustion and the carbon footprint of the truck transportation industry. The project design was straightforward. First, build fifty Truck Stop Electrification (TSE) facilities in truck stop parking lots across the country so trucks could plug-in to 110V, 220V, or 480VAC, and shut down the engine instead of idling. These facilities were strategically located at fifty truck stops along major U.S. Interstates with heavy truck traffic. Approximately 1,350 connection points were installed, including 150 high-voltage electric standby Transport Refrigeration Unit (eTRU) plugs--eTRUs are capable of plugging in to shore power1 to cool the refrigerated trailer for loads such as produce, meats and ice cream. Second, the project provided financial incentives on idle reduction equipment to 5,000 trucks in the form of rebates, to install equipment compatible with shore power. This equipment enables drivers to shut down the main engine when parked, to heat or cool their cab, charge batteries, or use other household appliances without idling—a common practice that uses approximately 1 gallon of diesel per hour. The rebate recipients were intended to be the first fleets to plug into Shorepower to save diesel fuel and ensure there is significant population of shore power capable trucks. This two part project was designed to complement each other by

  4. Preserving the Manhattan Project

    NASA Astrophysics Data System (ADS)

    Kelly, Cynthia

    2014-03-01

    When future generations look back on the 20th century, few events will rival the harnessing of nuclear energy as a turning point in world history, science and society. Yet, the Department of Energy has not always embraced its Manhattan Project origins. The presentation will focus on the progress made over the last 20 years to preserve the properties and first-hand accounts that for decades have been threatened with demolition and indifference. Since the mid-1950s, most remaining Manhattan Project properties at the Los Alamos National Laboratory had been abandoned. Among them was a cluster of wooden buildings called the ``V Site.'' This is where scientists assembled the ``Gadget,'' the world's first atomic device tested on July 16, 1945. Regardless of its significance, the ``V Site'' buildings like all the rest were slated for demolition. The Advisory Council on Historic Preservation (ACHP) toured the properties in November 1998. Most could not believe that the world's first atomic bomb was designed in such humble structures. The properties were declared to be ``monumental in their lack of monumentality.'' A Save America's Treasures grant for 700,000 was awarded to restore the properties. To raise the required matching funds, I left the Federal government and soon founded the Atomic Heritage Foundation. The presentation will trace the progress made over the last decade to generate interest and support nationwide to preserve the Manhattan Project heritage. Saving both the physical properties and first-hand accounts of the men and women have been a priority. Perhaps our most significant achievement may be legislation now under consideration by Congress to create a Manhattan Project National Historical Park. Seventy years later, the Manhattan Project is finally getting the recognition it deserves.

  5. ARJIS satellite demonstration project

    NASA Astrophysics Data System (ADS)

    Severance, Steve; Williams, Carl

    2005-06-01

    In 2003, the California Space Authority (CSA) was provided funding by the U. S. Congress through the Defense Appropriations Act to develop a project that would demonstrate the U.S. space enterprise capability that would contribute to the effectiveness of those engaged in Homeland Security. The project was given broad latitude in selecting the area of Homeland Security to be addressed and the nature of the space technology to be applied. CSA became aware of a nascent law enforcement data-sharing project in the San Diego region known as the Automated Regional Justice Information System (ARJIS). First developed by the police departments in San Diego, ARJIS is an innovative system that shares criminal justice information among 50 federal, state, and local agencies. ARJIS was completing a pilot project that enabled officers to receive information on handheld computers, which was transmitted wirelessly through cellular networks. The accessed information came from several databases that collectively contained the entire region's crime and arrest reports, traffic citations, and incidents, as well as state and county wants and warrants. The fundamental limitations that plague all cellular-based devices caught CSA's attention and resulted in a cooperative effort to harden the communications link between the patrol officer and critical data. The principal goal of the SATCOM development task was to create a proof-of-concept application that would use SATCOM links to augment the current ARJIS handheld wireless (cellular) capability. The successful technical demonstration and the positive support for satellite communications from the law enforcement community showed that this project filled a need-both for improved information sharing and for highly reliable communications systems.

  6. Breckinridge Project, initial effort

    SciTech Connect

    1982-01-01

    This report presents an overview of the Breckinridge Project and summarizes the results achieved during the development phase of the project performed under a Cooperative Agreement with the United States Department of Energy. The Breckinridge Project provides for the design, construction and operation of a 50,000 barrel per day coal liquefaction facility in Breckinridge County, Kentucky. The development of the basic technology used in the Breckinridge Project dates back to the late 1950's and the invention by Hydrocarbon Research, Inc., (HRI) of the ebullated-bed reactor and the H-OIL process. The H-COAL process is based on the H-OIL technology. This coal liquefaction process produces clean low-sulfur petroleum substitutes suitable for most types of hydrocarbon-based fuel and chemical uses regardless of the sulfur content of the coal. A large H-COAL Pilot Plant in operation at Catlettsburg, Kentucky, is converting 220 tons of coal per day into 600 barrels of distillate products by catalytic hydrogenation. The estimated capital cost of the commercial facility is $3.17 billion, and the associated out-of-pocket operating cost is $18 per barrel, both in January 1981 dollars. Financial analysis shows the project to be an attractive investment under certain leveraged conditions which are possible through the assistance of the Synthetic Fuels Corporation. Ashland Synthetic Fuels, Inc. is currently working with the Synthetic Fuels Corporation and potential partners to develop financing for the commercial venture. Critical permits are being obtained and an Environmental Impact Statement is being prepared pursuant to initiating site preparation in early 1983. Commercial operations are expected to start up in early 1988.

  7. Energy Storage Project

    NASA Technical Reports Server (NTRS)

    Mercer, Carolyn R.; Jankovsky, Amy L.; Reid, Concha M.; Miller, Thomas B.; Hoberecht, Mark A.

    2011-01-01

    NASA's Exploration Technology Development Program funded the Energy Storage Project to develop battery and fuel cell technology to meet the expected energy storage needs of the Constellation Program for human exploration. Technology needs were determined by architecture studies and risk assessments conducted by the Constellation Program, focused on a mission for a long-duration lunar outpost. Critical energy storage needs were identified as batteries for EVA suits, surface mobility systems, and a lander ascent stage; fuel cells for the lander and mobility systems; and a regenerative fuel cell for surface power. To address these needs, the Energy Storage Project developed advanced lithium-ion battery technology, targeting cell-level safety and very high specific energy and energy density. Key accomplishments include the development of silicon composite anodes, lithiated-mixed-metal-oxide cathodes, low-flammability electrolytes, and cell-incorporated safety devices that promise to substantially improve battery performance while providing a high level of safety. The project also developed "non-flow-through" proton-exchange-membrane fuel cell stacks. The primary advantage of this technology set is the reduction of ancillary parts in the balance-of-plant--fewer pumps, separators and related components should result in fewer failure modes and hence a higher probability of achieving very reliable operation, and reduced parasitic power losses enable smaller reactant tanks and therefore systems with lower mass and volume. Key accomplishments include the fabrication and testing of several robust, small-scale nonflow-through fuel cell stacks that have demonstrated proof-of-concept. This report summarizes the project s goals, objectives, technical accomplishments, and risk assessments. A bibliography spanning the life of the project is also included.

  8. Ceramic Technology Project

    SciTech Connect

    Not Available

    1992-03-01

    The Ceramic Technology Project was developed by the USDOE Office of Transportation Systems (OTS) in Conservation and Renewable Energy. This project, part of the OTS's Materials Development Program, was developed to meet the ceramic technology requirements of the OTS's automotive technology programs. Significant accomplishments in fabricating ceramic components for the USDOE and NASA advanced heat engine programs have provided evidence that the operation of ceramic parts in high-temperature engine environments is feasible. These programs have also demonstrated that additional research is needed in materials and processing development, design methodology, and data base and life prediction before industry will have a sufficient technology base from which to produce reliable cost-effective ceramic engine components commercially. A five-year project plan was developed with extensive input from private industry. In July 1990 the original plan was updated through the estimated completion of development in 1993. The objective is to develop the industrial technology base required for reliable ceramics for application in advanced automotive heat engines. The project approach includes determining the mechanisms controlling reliability, improving processes for fabricating existing ceramics, developing new materials with increased reliability, and testing these materials in simulated engine environments to confirm reliability. Although this is a generic materials project, the focus is on the structural ceramics for advanced gas turbine and diesel engines, ceramic bearings and attachments, and ceramic coatings for thermal barrier and wear applications in these engines. To facilitate the rapid transfer of this technology to US industry, the major portion of the work is being done in the ceramic industry, with technological support from government laboratories, other industrial laboratories, and universities.

  9. Breakthrough Propulsion Physics Project: Project Management Methods

    NASA Technical Reports Server (NTRS)

    Millis, Marc G.

    2004-01-01

    To leap past the limitations of existing propulsion, the NASA Breakthrough Propulsion Physics (BPP) Project seeks further advancements in physics from which new propulsion methods can eventually be derived. Three visionary breakthroughs are sought: (1) propulsion that requires no propellant, (2) propulsion that circumvents existing speed limits, and (3) breakthrough methods of energy production to power such devices. Because these propulsion goals are presumably far from fruition, a special emphasis is to identify credible research that will make measurable progress toward these goals in the near-term. The management techniques to address this challenge are presented, with a special emphasis on the process used to review, prioritize, and select research tasks. This selection process includes these key features: (a) research tasks are constrained to only address the immediate unknowns, curious effects or critical issues, (b) reliability of assertions is more important than the implications of the assertions, which includes the practice where the reviewers judge credibility rather than feasibility, and (c) total scores are obtained by multiplying the criteria scores rather than by adding. Lessons learned and revisions planned are discussed.

  10. Program and Project Management Framework

    NASA Technical Reports Server (NTRS)

    Butler, Cassandra D.

    2002-01-01

    The primary objective of this project was to develop a framework and system architecture for integrating program and project management tools that may be applied consistently throughout Kennedy Space Center (KSC) to optimize planning, cost estimating, risk management, and project control. Project management methodology used in building interactive systems to accommodate the needs of the project managers is applied as a key component in assessing the usefulness and applicability of the framework and tools developed. Research for the project included investigation and analysis of industrial practices, KSC standards, policies, and techniques, Systems Management Office (SMO) personnel, and other documented experiences of project management experts. In addition, this project documents best practices derived from the literature as well as new or developing project management models, practices, and techniques.

  11. Artificial Gravity Research Project

    NASA Technical Reports Server (NTRS)

    Kamman, Michelle R.; Paloski, William H.

    2005-01-01

    Protecting the health, safety, and performance of exploration-class mission crews against the physiological deconditioning resulting from long-term weightlessness during transit and long-term hypogravity during surface operations will require effective, multi-system countermeasures. Artificial gravity (AG), which would replace terrestrial gravity with inertial forces generated by rotating the transit vehicle or by a human centrifuge device within the transit vehicle or surface habitat, has long been considered a potential solution. However, despite its attractiveness as an efficient, multi-system countermeasure and its potential for improving the environment and simplifying operational activities (e.g., WCS, galley, etc.), much still needs to be learned regarding the human response to rotating environments before AG can be successfully implemented. This paper will describe our approach for developing and implementing a rigorous AG Research Project to address the key biomedical research questions that must be answered before developing effective AG countermeasure implementation strategies for exploration-class missions. The AG Research Project will be performed at JSC, ARC, extramural academic and government research venues, and international partner facilities maintained by DLR and IMBP. The Project includes three major ground-based human research subprojects that will lead to flight testing of intermittent short-radius AG in ISS crewmembers after 201 0, continuous long-radius AG in CEV crews transiting to and from the Moon, and intermittent short-radius AG plus exercise in lunar habitats. These human ground-based subprojects include: 1) a directed, managed international short-radius project to investigate the multi-system effectiveness of intermittent AG in human subjects deconditioned by bed rest, 2) a directed, managed long-radius project to investigate the capacity of humans to live and work for extended periods in rotating environments, and 3) a focused

  12. Parallel Eclipse Project Checkout

    NASA Technical Reports Server (NTRS)

    Crockett, Thomas M.; Joswig, Joseph C.; Shams, Khawaja S.; Powell, Mark W.; Bachmann, Andrew G.

    2011-01-01

    Parallel Eclipse Project Checkout (PEPC) is a program written to leverage parallelism and to automate the checkout process of plug-ins created in Eclipse RCP (Rich Client Platform). Eclipse plug-ins can be aggregated in a feature project. This innovation digests a feature description (xml file) and automatically checks out all of the plug-ins listed in the feature. This resolves the issue of manually checking out each plug-in required to work on the project. To minimize the amount of time necessary to checkout the plug-ins, this program makes the plug-in checkouts parallel. After parsing the feature, a request to checkout for each plug-in in the feature has been inserted. These requests are handled by a thread pool with a configurable number of threads. By checking out the plug-ins in parallel, the checkout process is streamlined before getting started on the project. For instance, projects that took 30 minutes to checkout now take less than 5 minutes. The effect is especially clear on a Mac, which has a network monitor displaying the bandwidth use. When running the client from a developer s home, the checkout process now saturates the bandwidth in order to get all the plug-ins checked out as fast as possible. For comparison, a checkout process that ranged from 8-200 Kbps from a developer s home is now able to saturate a pipe of 1.3 Mbps, resulting in significantly faster checkouts. Eclipse IDE (integrated development environment) tries to build a project as soon as it is downloaded. As part of another optimization, this innovation programmatically tells Eclipse to stop building while checkouts are happening, which dramatically reduces lock contention and enables plug-ins to continue downloading until all of them finish. Furthermore, the software re-enables automatic building, and forces Eclipse to do a clean build once it finishes checking out all of the plug-ins. This software is fully generic and does not contain any NASA-specific code. It can be applied to any

  13. Project analysis and integration area

    NASA Technical Reports Server (NTRS)

    1986-01-01

    The objective of the Project Analysis and Integration Area (PA&I) is to support the planning, analysis, integration, and decision making activities of the Flat-plate Solar Array FSA) Project. Accordingly, PA&I supports the Project by developing and documenting Project plans based, in part, on the technical and economic assessments performed by PA&I of the various technical options. Goals for module technical performance and costs, derived from National Photovoltaics Program goals, are established by PA&I for each of the major technical activities in the Project. Assessments of progress toward achievement of goals are made to guide decision making within the Project.

  14. Evaluation methods for hospital projects.

    PubMed

    Buelow, Janet R; Zuckweiler, Kathryn M; Rosacker, Kirsten M

    2010-01-01

    The authors report the findings of a survey of hospital managers on the utilization of various project selection and evaluation methodologies. The focus of the analysis was the empirical relationship between a portfolio of project evaluation(1) methods actually utilized for a given project and several measures of perceived project success. The analysis revealed that cost-benefit analysis and top management support were the two project evaluation methods used most often by the hospital managers. The authors' empirical assessment provides evidence that top management support is associated with overall project success.

  15. The Project-Oriented Matrix and Instructional Development Project Management.

    ERIC Educational Resources Information Center

    Clymer, E. William

    1984-01-01

    Describes organizational factors that influence most instructional development projects, relates them to the features of the project-oriented matrix, and lists and explains specific matrix management strategies that instructional developers can use to solve common management problems. (MBR)

  16. Exe-Guard Project

    SciTech Connect

    Smith, Rhett; Marshall, Tim; Chavez, Adrian; Bratus, Sergey

    2016-01-30

    The exe-Guard Project is an alliance between Dominion Virginia Power (DVP), Sandia National Laboratories (SNL), Dartmouth University, and Schweitzer Engineering Laboratories (SEL). SEL is primary recipient on this project. The exe-Guard project was selected for award under DE-FOA-0000359 with CFDA number 81.122 to address Topic Area of Interest 4: Hardened platforms and Systems. The exe-Guard project developed an antivirus solution for control system embedded devices to prevent the execution of unauthorized code and maintain settings and configuration integrity. This project created a white list antivirus solution for control systems capable of running on embedded Linux® operating systems. White list antivirus methods allow only credible programs to run through the use of digital signatures and hash functions. Once a system’s secure state is baselined, white list antivirus software denies deviations from that state because of the installation of malicious code as this changes hash results. Black list antivirus software has been effective in traditional IT environments but has negative implications for control systems. Black list antivirus uses pattern matching and behavioral analysis to identify system threats while relying on regular updates to the signature file and recurrent system scanning. Black list antivirus is vulnerable to zero day exploits which have not yet been incorporated into a signature file update. System scans hamper the performance of high availability applications, as revealed in NIST special publication 1058 which summarizes the impact of blacklist antivirus on control systems: Manual or “on-demand” scanning has a major effect on control processes in that they take CPU time needed by the control process (Sometimes close to 100% of CPU time). Minimizing the antivirus software throttle setting will reduce but not eliminate this effect. Signature updates can also take up to 100% of CPU time, but for a much shorter period than a typical

  17. Project Management Plan for the Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Shipler, D.B.

    1992-03-01

    This Project Management Plan (PMP) describes the approach that will be used to manage the Hanford Environmental Dose Reconstruction (HEDR) Project. The plan describes the management structure and the technical and administrative control systems that will be used to plan and control the HEDR Project performance. The plan also describes the relationship among key project participants: Battelle, the Centers for Disease Control (CDC), and the Technical Steering Panel (TSP).

  18. Final Project Report

    SciTech Connect

    Small, R. Justin; Bryan, Frank; Tribbia, Joseph; Park, Sungsu; Dennis, John; Saravanan, R.; Schneider, Niklas; Kwon, Young-Oh

    2015-06-01

    Most climate models are currently run with grid spacings of around 100km, which, with today’s computing power, allows for long (up to 1000 year) simulations, or ensembles of simulations to explore climate change and variability. However this grid spacing does not resolve important components of the weather/climate system such as atmospheric fronts and mesoscale systems, and ocean boundary currents and eddies. The overall aim of this project has been to look at the effect of these small-scale features on the weather/climate system using a suite of high and low resolution climate models, idealized models and observations. This project was only possible due to the highly scalable aspect of the CAM Spectral Element dynamical core, and the significant resources allocated at Yellowstone and NERSC for which we are grateful.

  19. Optical projection angiography

    NASA Astrophysics Data System (ADS)

    Liao, Riwei; Wang, Mingyi; Zhang, Fuli; Han, Dingan; Wang, Ruikang K.; Yang, Guojian; Zeng, Yaguang

    2016-11-01

    We propose the optical projection angiography (OPA) based on lateral dynamic scattering light for visualizing a three-dimensional (3D) blood-flow network. In OPA, a pulsed laser source illuminates a live biological sample for eliminating digital camera integration effects. The 2D flow image can be obtained by separating the dynamic and static scattering light signal of each camera pixel in the frequency domain. Flow images at a different angle are combined to reconstruct the 3D volume of the sample to realize OPA. Moreover, as our experiment retains the bright-field optical projection tomography (OPT) setup, the OPA image for the circulatory system and the OPT image for the skeletal structure can simultaneously be reconstructed. The experimental results can potentially be applied in physiological development studies.

  20. Land Cover Trends Project

    USGS Publications Warehouse

    Acevedo, William

    2006-01-01

    The Land Cover Trends Project is designed to document the types, rates, causes, and consequences of land cover change from 1973 to 2000 within each of the 84 U.S. Environmental Protection Agency (EPA) Level III ecoregions that span the conterminous United States. The project's objectives are to: * Develop a comprehensive methodology using probability sampling and change analysis techniques and Landsat Multispectral Scanner (MSS), Thematic Mapper (TM), and Enhanced Thematic Mapper (ETM) data for estimating regional land cover change. * Characterize the spatial and temporal characteristics of conterminous U.S. land cover change for five periods from 1973 to 2000 (nominally 1973, 1980, 1986, 1992, and 2000). * Document the regional driving forces and consequences of change. * Prepare a national synthesis of land cover change.

  1. Nucla CFB Demonstration Project

    SciTech Connect

    Not Available

    1990-12-01

    This report documents Colorado-Ute Electric Association's Nucla Circulating Atmospheric Fluidized-Bed Combustion (AFBC) demonstration project. It describes the plant equipment and system design for the first US utility-size circulating AFBC boiler and its support systems. Included are equipment and system descriptions, design/background information and appendices with an equipment list and selected information plus process flow and instrumentation drawings. The purpose of this report is to share the information gathered during the Nucla circulating AFBC demonstration project and present it so that the general public can evaluate the technical feasibility and cost effectiveness of replacing pulverized or stoker-fired boiler units with circulating fluidized-bed boiler units. (VC)

  2. The FIRE Project

    NASA Technical Reports Server (NTRS)

    Mcdougal, D.

    1986-01-01

    The International Satellite Cloud Climatology Project's (ISCCP) First ISCCP Regional Experiment (FIRE) project is a program to validate the cloud parameters derived by the ISCCP. The 4- to 5-year program will concentrate on clouds in the continental United States, particularly cirrus and marine stratocumulus clouds. As part of the validation process, FIRE will acquire satellite, aircraft, balloon, and surface data. These data (except for the satellite data) will be amalgamated into one common data set. Plans are to generate a standardized format structure for use in the PCDS. Data collection will begin in April 1986, but will not be available to the general scientific community until 1987 or 1988. Additional pertinent data sets already reside in the PCDS. Other qualifications of the PCDS for use in this validation program were enumerated.

  3. Project DEEP STEAM

    NASA Astrophysics Data System (ADS)

    Aeschliman, D. P.; Clay, R. G.; Donaldson, A. B.; Eisenhawer, S. W.; Fox, R. L.; Johnson, D. R.; Mulac, A. J.

    1982-01-01

    The objective of Project DEEP STEAM is to develop the technology to economically produce heavy oils from deep reservoirs. The tasks included in this project are the development of thermally efficient delivery systems and downhole steam generation systems. During the period January 1-March 31, 1981, effort has continued on a low pressure combustion downhole generator (Rocketdyne), and on two high pressure designs (Foster-Miller Associates, Sandia National Laboratories). The Sandia design was prepared for deployment in the Wilmington Field at Long Beach, California. Progress continued on the Min-Stress II packer concept at L'Garde, Inc., and on the extruded metal packer at Foster-Miller. Initial bare string field data are reported on the insulated tubular test at Lloydminster, Saskatchewan, Canada.

  4. Project ASTRO-Tucson

    NASA Astrophysics Data System (ADS)

    Walker, C. E.; Jacoby, S. H.

    2001-12-01

    Imagine melding together the best ingredients available to inspire and excite children about astronomy. Project ASTRO-Tucson has succeeded in perfecting one such recipe: equal parts of art, writing, inquiry, and astronomy blended with inspiring speakers and set against the magnificent backdrop of Kitt Peak National Observatory. Led by the National Optical Astronomy Observatory (NOAO) Educational Outreach Department and funded by NSF, Project ASTRO-Tucson has presented six annual workshops and reached over 13,000 students by forming ongoing partnerships between astronomers and educators. We present results from the 2001 workshop, including efforts to make the integrated workshop palatable to astronomers and teachers, and describe plans to make some components of the successful face to face workshop web-accessible, and therefore available to a larger audience.

  5. [Healthy Cities projects].

    PubMed

    Takano, Takehito

    2002-05-01

    This is a review article on "Healthy Cities". The Healthy Cities programme has been developed by the World Health Organization (WHO) to tackle urban health and environmental issues in a broad way. It is a kind of comprehensive policy package to carry out individual projects and activities effectively and efficiently. Its key aspects include healthy public policy, vision sharing, high political commitment, establishment of structural organization, strategic health planning, intersectoral collaboration, community participation, setting approach, development of supportive environment for health, formation of city health profile, national and international networking, participatory research, periodic monitoring and evaluation, and mechanisms for sustainability of projects. The present paper covered the Healthy Cities concept and approaches, rapid urbanization in the world, developments of WHO Healthy Cities, Healthy Cities developments in the Western Pacific Region, the health promotion viewpoint, and roles of research.

  6. Moisture Metrics Project

    SciTech Connect

    Schuchmann, Mark

    2011-08-31

    the goal of this project was to determine the optimum moisture levels for biomass processing for pellets commercially, by correlating data taken from numerous points in the process, and across several different feedstock materials produced and harvested using a variety of different management practices. This was to be done by correlating energy consumption and material through put rates with the moisture content of incoming biomass ( corn & wheat stubble, native grasses, weeds, & grass straws), and the quality of the final pellet product.This project disseminated the data through a public website, and answering questions form universities across Missouri that are engaged in biomass conversion technologies. Student interns from a local university were employed to help collect data, which enabled them to learn firsthand about biomass processing.

  7. Swamp Works- Multiple Projects

    NASA Technical Reports Server (NTRS)

    Carelli, Jonathan M.; Schuler, Jason M.; Chandler, Meredith L.

    2013-01-01

    My Surface Systems internship over the summer 2013 session covered a broad range of projects that utilized multiple fields of engineering and technology. This internship included a project to create a command center for a 120 ton regolith bin, for the design and assembly of a blast shield to add further protection for the Surface Systems engineers, for the design and assembly of a portable four monitor hyper wall strip that could extend as large as needed, research and programming a nano drill that could be utilized on a next generation robot or rover, and social media tasks including the making of videos, posting to social networking websites and creation of a new outreach program to help spread the word about the Swamp Works laboratory.

  8. KSC History Project

    NASA Technical Reports Server (NTRS)

    Moore, Patrick K.

    2003-01-01

    The 2003 NASA/ASEE KSC History Project focused on a series of six history initiatives designed to acquire, preserve, and interpret the history of Kennedy Space Center. These six projects included the completion of Voices From the Cape, historical work co-authored with NASA historian Roger Launius, the completion of a series of oral histories with key KSC personnel, expansion of monograph on Public Affairs into two comprehensive pieces on KSC press operations and KSC visitor operations, the expansion of KSC Historical Concept Maps (Cmap) for history knowledge preservation, the expansion of the KSC oral history program through the administration of an oral history workshop for KSC-based practitioners, and the continued collaborative relationships between Kennedy Space Center, the University of West Florida, the University of Central Florida and other institutions including the University of Louisiana at Lafayette.

  9. ISIS and META projects

    NASA Technical Reports Server (NTRS)

    Birman, Kenneth; Cooper, Robert; Marzullo, Keith

    1990-01-01

    The ISIS project has developed a new methodology, virtual synchony, for writing robust distributed software. High performance multicast, large scale applications, and wide area networks are the focus of interest. Several interesting applications that exploit the strengths of ISIS, including an NFS-compatible replicated file system, are being developed. The META project is distributed control in a soft real-time environment incorporating feedback. This domain encompasses examples as diverse as monitoring inventory and consumption on a factory floor, and performing load-balancing on a distributed computing system. One of the first uses of META is for distributed application management: the tasks of configuring a distributed program, dynamically adapting to failures, and monitoring its performance. Recent progress and current plans are reported.

  10. GOATS Image Projection Component

    NASA Technical Reports Server (NTRS)

    Haber, Benjamin M.; Green, Joseph J.

    2011-01-01

    When doing mission analysis and design of an imaging system in orbit around the Earth, answering the fundamental question of imaging performance requires an understanding of the image products that will be produced by the imaging system. GOATS software represents a series of MATLAB functions to provide for geometric image projections. Unique features of the software include function modularity, a standard MATLAB interface, easy-to-understand first-principles-based analysis, and the ability to perform geometric image projections of framing type imaging systems. The software modules are created for maximum analysis utility, and can all be used independently for many varied analysis tasks, or used in conjunction with other orbit analysis tools.

  11. Fermilab Library projects

    SciTech Connect

    Garrett, P.; Ritchie, D.

    1990-05-03

    Preprint database management as done at various centers -- the subject of this workshop -- is hard to separate from the overall activities of the particular center. We therefore present the wider context at the Fermilab Library into which preprint database management fits. The day-to-day activities of the Library aside, the dominant activity at present is that of the ongoing Fermilab Library Automation. A less dominant but relatively time-consuming activity is that of doing more online searches in commercial databases on behalf of laboratory staff and visitors. A related activity is that of exploring the benefits of end-user searching of similar sources as opposed to library staff searching of the same. The Library Automation Project, which began about two years ago, is about to go fully online.'' The rationale behind this project is described in the documents developed during the December 1988--February 1989 planning phase.

  12. KSC History Project

    NASA Technical Reports Server (NTRS)

    Moore, Patrick K.

    2002-01-01

    The 2002 NASA/ASEE KSC History Project focused on a series of seven history initiatives designed to acquire, preserve, and interpret the history of Kennedy Space Center. These seven projects included the co-authoring of Voices From the Cape, historical work with NASA historian Roger Launius, the completion of a series of oral histories with key KSC personnel, a monograph on Public Affairs, the development of a Historical Concept Map (CMap) for history knowledge preservation, advice on KSC history database and web interface capabilities, the development of a KSC oral history program and guidelines of training and collection, and the development of collaborative relationships between Kennedy Space Center, the University of West Florida, and the University of Central Florida.

  13. DSN human factors project

    NASA Technical Reports Server (NTRS)

    Chafin, R. L.; Martin, T. H.

    1980-01-01

    The project plan was to hold focus groups to identify the factors influencing the ease of use characteristics of software and to bond the problem. A questionnaire survey was conducted to evaluate those factors which were more appropriately measured with that method. The performance oriented factors were analyzed and relationships hypothesized. The hypotheses were put to test in the experimental phase of the project. In summary, the initial analysis indicates that there is an initial performance effect favoring computer controlled dialogue but the advantage fades fast as operators become experienced. The user documentation style is seen to have a significant effect on performance. The menu and prompt command formats are preferred by inexperienced operators. The short form mnemonic is least favored. There is no clear best command format but the short form mnemonic is clearly the worst.

  14. SAMURAI Project at RIBF

    NASA Astrophysics Data System (ADS)

    Shimizu, Y.; Kobayashi, T.; Kubo, T.; Chiga, N.; Isobe, T.; Kawabata, T.; Kondo, Y.; Kusaka, K.; Matsuda, Y.; Motobayashi, T.; Murakami, T.; Nakamura, T.; Ohnishi, J.; Ohnishi, T.; Okuno, H.; Otsu, H.; Sakurai, H.; Sato, H.; Satou, Y.; Sekiguchi, K.; Togano, Y.; Yoneda, K.

    2011-09-01

    SAMURAI project aims to open a new research field in nuclear physics by the use of a large acceptance spectrometer for kinematically complete measurements of multiple particles emitted in RI-beam induced reactions. The SAMURAI spectrometer consists of a large gap superconducting dipole magnet, heavy ion detectors, neutron detectors, and proton detectors. What is special about the SAMURAI system is that projectile-rapidity protons or neutrons are detected with large angular and momentum acceptance in coincidence with heavy projectile fragments. With an effective combination of these equipments, the SAMURAI system allows us to perform various experiments: electromagnetic dissociation, various direct reactions, polarized deuteron induced reactions, and EOS studies. SAMURAI project is currently underway at RIBF. The construction of the superconducting dipole magnet will start in autumn 2010 and finish in spring 2011. The detectors are also being constructed in parallel. The first commissioning run will be performed in early 2012.

  15. The Viking project. [summary

    NASA Technical Reports Server (NTRS)

    Soffen, G. A.

    1977-01-01

    The Viking project launched two unmanned spacecraft to Mars in 1975 for scientific exploration with special emphasis on the search for life. Each spacecraft consisted of an orbiter and a lander. The landing sites were finally selected after the spacecraft were in orbit. Thirteen investigations were performed: three mapping experiments from the orbiter, one atmospheric investigation during the lander entry phase, eight experiments on the surface of the planet, and one using the spacecraft radio and radar systems. The experiments on the surface dealt principally with biology, chemistry, geology, and meteorology. Seventy-eight scientists have participated in the 13 teams performing these experiments. This paper is a summary of the project and an introduction to the articles that follow.

  16. Rapid Building Assessment Project

    DTIC Science & Technology

    2014-05-01

    Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. 1. REPORT...complication to the site managers , while simultaneously yielding performance analysis results similar to ASHRAE Level II onsite audits (the comparison...38 Figure 16: Energy Site manager time for FirstFuel RBA Time vs ASHRAE Level II Audit Time (in hours) for one building

  17. Content Addressable Memory Project

    DTIC Science & Technology

    1990-11-01

    The Content Addressable M1-emory Project consists of the development of several experimental software systems on an AMT Distributed Array Processor...searching (database) compiler algorithms memory management other systems software) Linear C is an unlovely hybrid language which imports the CAM...memory from AMT’s operating system for the DAP; how- ever, other than this limitation, the memory management routines work exactly as their C counterparts

  18. Hydraulic Actuator Project

    DTIC Science & Technology

    2003-11-01

    Hydraulic Actuator Project Stakeholder meeting held 7- 8 October in Los Angeles; 58 attendees representing aircraft and actuator OEMs, seal...PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Naval Research Laboratory,4555 Overlook Ave., SW ,Washington,DC,20375 8 . PERFORMING ORGANIZATION REPORT...unclassified c. THIS PAGE unclassified Standard Form 298 (Rev. 8 -98) Prescribed by ANSI Std Z39-18 Actuator JTP: Coupon Testing Substrate

  19. Project BioShield

    DTIC Science & Technology

    2005-06-10

    to Congress. Expedited Peer Review . The Project BioShield Act of 2004 authorizes the HHS Secretary to use an expedited award process, rather than the...normal peer review process, for grants, contracts, and cooperative agreements related to biomedical countermeasure R&D activity, if the Secretary... peer review process will reduce the quality of the research.6 Peer review is designed to maximize the chances that only proposals with the greatest

  20. Project BioShield

    DTIC Science & Technology

    2006-09-27

    Expedited Peer Review . The Project BioShield Act of 2004 authorizes the HHS Secretary to use an expedited award process, rather than the normal peer ...such awards, or to many, will depend on what needs the Secretary deems pressing. Some scientists have expressed concerns that an expedited peer review process...will reduce the quality of the research.6 Peer review is designed to maximize the chances that only proposals with the greatest scientific

  1. Project Ares 3

    NASA Technical Reports Server (NTRS)

    Raymer, Dan; Russell, Phyllis; Fox, Tim; Meyers, Doug; Lovric, Steven; Grabow, Robert; Epp, Manfred; Wynn, Warren, Jr.; Mako, Zoltan; Linzner, Gunther

    1992-01-01

    The mission of Project Ares is to design and fabricate an Earth prototype, autonomous flying rover capable of flying on the Martian surface. The project was awarded to California State University, Northridge (CSUN) in 1989 where an in-depth paper study was completed. The second year's group, Project Ares 2, designed and fabricated a full-scale flight demonstration aircraft. Project Ares 3, the third and final group, is responsible for propulsion system design and installation, controls and instrumentation, and high altitude testing. The propulsion system consists of a motor and its power supply, geartrain, and propeller. The motor is a four-brush DC motor powered by a 50-V NiCd battery supply. A pulley and belt arrangement is used for the geartrain and includes light weight, low temperature materials. The propeller is constructed from composite materials which ensures high strength and light weight, and is specifically developed to provide thrust at extremely high altitudes. The aircraft is controlled with a ground-based radio control system and an autopilot which will activate in the event that the control signal is lost. A transponder is used to maintain radar contact for ground tracking purposes. The aircraft possesses a small, onboard computer for collecting and storing flight data. To safeguard the possibility of computer failure, all flight data is transmitted to a ground station via a telemetry system. An initial, unpowered, low-level test flight was completed in August of 1991. Testing of systems integration in the second low-level test flight resulted in loss of elevator control which caused considerable damage on landing. Complete failure analysis and repairs are scheduled for September of 1992.

  2. Baltimore applications project

    NASA Technical Reports Server (NTRS)

    Golden, T. S.; Yaffee, P.

    1978-01-01

    The Baltimore Applications Project (BAP) was originally designed as an experimental effort to assist the government of the City of Baltimore in applying technology to the solution of municipal problems. Recent modifications in the structuring and operation of the program are discussed. A tabular update on the individual tasks undertaken and their treatment is provided. Details of energy and nonenergy related tasks are presented in appendices.

  3. Microcode Verification Project.

    DTIC Science & Technology

    1980-05-01

    MICROCOPY RESOLUTION TEST CHART MADCTR.S042 /2>t w NI TeduIem R"pm’ 00 0 MICRQCODE VERIFICATION PROJECT Unhvrsity of Southern California Stephen D...in the production, testing , and maintenance of Air Force software. This effort was undertaken in response to that goal. The objective of the effort was...rather than hard wiring, is a recent development in computer technology. Hardware diagnostics do not fulfill testing requirements for these computers

  4. Apollo - Project FIRE

    NASA Technical Reports Server (NTRS)

    1962-01-01

    Project FIRE (Flight Investigation Reentry Environment) studied the effects of reentry heating on spacecraft materials. It involved both wind tunnel and flight tests, although the majority were tests with Atlas rockets and recoverable reentry packages. These flight tests took place at Cape Canaveral in Florida. Wind tunnel tests were made in several Langley tunnels including the Unitary Plan Wind Tunnel, the 8-foot High-Temperature Tunnel and the 9x6-Foot Thermal Structures Tunnel.

  5. Swamp Works- Multiple Projects

    NASA Technical Reports Server (NTRS)

    Carelli, Jonathan M.

    2013-01-01

    My Surface Systems internship over the summer 2013 session covered a broad range of projects that ranged multiple aspects and fields of engineering and technology. This internship included a project to create a command center for a 120 ton regolith bin, a design and build for a blast shield to add further protection for the Surface Systems engineers, a design for a portable four monitor hyper wall that can extend as large as needed, research and programming a nano drill for a next generation robot, and social media tasks including the making of videos, posting to social networking websites and implementation of a new weekly outreach program to help spread the word about the Swamp Works laboratory. The objectives for the command center were to create a central computer controlled area for the still in production lunar regolith bin. It needed to be easy to use and the operating systems had to be Linux. The objectives for the hyper wall were to build a mobile transport of monitors that could potentially attach to one another. It needed to be light but sturdy, and have the ability to last. The objectives for the blast shield included a robust design that could withstand a small equipment malfunction, while also being convenient for use. The objectives for the nano-drill included the research and implementation of programming for vertical and horizontal movement. The hyper wall and blasts shield project were designed by me in the Pro/Engineer/Creo2 software. Each project required a meeting with the Swamp Works engineers and was declared successful.

  6. The Starlite Project

    DTIC Science & Technology

    1989-10-01

    system generator . our research. The first problem is the overhead This section discusses the two components of of procedure calls through multiple...with different options, we The long-term goal of the StarLite project is to designed and implemented a UNIX-compatible create an operating system ... generator that could * operating system according to the layering prin- automatically select implementations from a ciples defined by ISO[5]. The StarLite

  7. Project management tool

    NASA Technical Reports Server (NTRS)

    Maluf, David A. (Inventor); Gawdiak, Yuri O. (Inventor); Bell, David G. (Inventor); Gurram, Mohana M. (Inventor)

    2009-01-01

    A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as a monthly report, a task plan report, a budget report and a risk management report, are generated and made available for display or further analysis. An extensible database allows searching for information based upon context and upon content.

  8. The plagiarism project.

    PubMed

    Glassman, Nancy R; Sorensen, Karen; Habousha, Racheline G; Minuti, Aurelia; Schwartz, Rachel

    2011-01-01

    Plagiarism has been a problem plaguing academia for centuries. The Internet has made it easier than ever to copy material from one electronic document and paste it into another. Many cases are unintentional, as writers are unaware of the rules regarding plagiarism. This paper provides an overview of plagiarism and describes a project in which librarians partnered with the assistant dean of a graduate science program to educate students about the perils of plagiarism and encourage ethical writing practices.

  9. Project Proposals Evaluation

    NASA Astrophysics Data System (ADS)

    Encheva, Sylvia; Tumin, Sharil

    2009-08-01

    Collaboration among various firms has been traditionally used trough single project joint ventures for bonding purposes. Eventhough the performed work is usually beneficial to some extend to all participants, the type of collaboration option to be adapted is strongly influenced by overall purposes and goals that can be achieved. In order to facilitate a choice of collaboration option best suited to a firm's need a computer based model is proposed.

  10. HAD Oral History Project

    NASA Astrophysics Data System (ADS)

    Holbrook, Jarita

    2014-01-01

    The Historical Astronomy Division is the recipient of an American Institute of Physics Neils Bohr Library Grant for Oral History. HAD has assembled a team of volunteers to conduct oral history interviews since May 2013. Each oral history interview varies in length between two and six hours. This presentation is an introduction to the HAD Oral History Project and the activities of the team during the first six months of the grant.

  11. Rapid Building Assessment Project

    DTIC Science & Technology

    2014-05-01

    15  Figure 10. Energy Site manager time for FirstFuel RBA Time versus ASHRAE Level II audit time (in hours) for one building... ASHRAE American Society of Heating Refrigeration and Air Conditioning Engineers CVRMSE Root-mean-square deviation DoD Department of Defense DOE...Heating Refrigeration and Air Conditioning Engineers ( ASHRAE ) Level II on-site audits across 16 of the DoD buildings. The results of this project and

  12. Network Visualization Project (NVP)

    DTIC Science & Technology

    2016-07-01

    as an integral part of modern information systems, the importance of the organization and clarity of said networks grows as well. The goal of this...project differs from those of similar existing tools in its attempt to optimize both content and clarity, as the product is meant to maintain aesthetic...distribution is unlimited. iii Contents List of Figures iv 1. Introduction and Background 1 2. Application Design 1 2.1 Dshell: Back-End Data Handling

  13. Renewable energy project development

    SciTech Connect

    Ohi, J.

    1996-12-31

    The author presents this paper with three main thrusts. The first is to discuss the implementation of renewable energy options in China, the second is to identify the key project development steps necessary to implement such programs, and finally is to develop recommendations in the form of key issues which must be addressed in developing such a program, and key technical assistance needs which must be addressed to make such a program practical.

  14. Bloch vector projection noise

    NASA Technical Reports Server (NTRS)

    Wang, Li-Jun; Bacon, A. M.; Zhao, H.-Z.; Thomas, J. E.

    1994-01-01

    In the optical measurement of the Bloch vector components describing a system of N two-level atoms, the quantum fluctuations in these components are coupled into the measuring optical field. This paper develops the quantum theory of optical measurement of Bloch vector projection noise. The preparation and probing of coherence in an effective two-level system consisting of the two ground states in an atomic three-level lambda-scheme are analyzed.

  15. Stumping for the Project

    NASA Technical Reports Server (NTRS)

    Ginty, Carol

    2003-01-01

    Advocating research is a little trickier than selling other projects at NASA. You can point to a satellite. You can point to a rocket you can see the Shuttle and the International Space Station . But it's different on the research side . How do you display Computational Fluid Dynamics? How do you get someone to understand the value of composite materials or Nano-tubes that they can't even see without a microscope?

  16. The Maury Project

    DTIC Science & Technology

    2016-06-07

    background of pre-college teachers on the physical foundations of oceanography. The training of teachers is through a peer- training process of... training the trainers at a two-week workshop held at the US Naval Academy and subsequently via single-topic modules presented in sessions presented...throughout the United States. OBJECTIVES This project was designed to meet the following objectives: (a) Master teachers will be trained to be peer

  17. The Human Genome Diversity Project

    SciTech Connect

    Cavalli-Sforza, L.

    1994-12-31

    The Human Genome Diversity Project (HGD Project) is an international anthropology project that seeks to study the genetic richness of the entire human species. This kind of genetic information can add a unique thread to the tapestry knowledge of humanity. Culture, environment, history, and other factors are often more important, but humanity`s genetic heritage, when analyzed with recent technology, brings another type of evidence for understanding species` past and present. The Project will deepen the understanding of this genetic richness and show both humanity`s diversity and its deep and underlying unity. The HGD Project is still largely in its planning stages, seeking the best ways to reach its goals. The continuing discussions of the Project, throughout the world, should improve the plans for the Project and their implementation. The Project is as global as humanity itself; its implementation will require the kinds of partnerships among different nations and cultures that make the involvement of UNESCO and other international organizations particularly appropriate. The author will briefly discuss the Project`s history, describe the Project, set out the core principles of the Project, and demonstrate how the Project will help combat the scourge of racism.

  18. 40 CFR 258.41 - Project XL Bioreactor Landfill Projects.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Project XL Bioreactor Landfill Projects. 258.41 Section 258.41 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Design Criteria § 258.41 Project XL...

  19. Project Future Workplace Literacy Project. Final Performance Report.

    ERIC Educational Resources Information Center

    Jefferson County Public Schools, Louisville, KY.

    Project Future was a 3-year project begun in 1994 as a partnership between the Jefferson County Public Schools and Futura Plastics and Engineering, Inc., Louisville, Kentucky. The project targeted the workplace basic skills of plastic injection molding production workers. The skills classes improved the general education of the workers with…

  20. NEH Curriculum Integration Project: Selected Project Materials, 1981-1982.

    ERIC Educational Resources Information Center

    Arizona Univ., Tucson. Women's Studies Program.

    Materials from a project to integrate the new research on women into the University of Arizona curriculum are divided into four sections. Section I, recruitment, contains a letter describing the project to prospective faculty participants and a list of questions used to interview faculty for participation in the project. Section II contains an…

  1. NREL Smart Grid Projects

    SciTech Connect

    Hambrick, J.

    2012-01-01

    Although implementing Smart Grid projects at the distribution level provides many advantages and opportunities for advanced operation and control, a number of significant challenges must be overcome to maintain the high level of safety and reliability that the modern grid must provide. For example, while distributed generation (DG) promises to provide opportunities to increase reliability and efficiency and may provide grid support services such as volt/var control, the presence of DG can impact distribution operation and protection schemes. Additionally, the intermittent nature of many DG energy sources such as photovoltaics (PV) can present a number of challenges to voltage regulation, etc. This presentation provides an overview a number of Smart Grid projects being performed by the National Renewable Energy Laboratory (NREL) along with utility, industry, and academic partners. These projects include modeling and analysis of high penetration PV scenarios (with and without energy storage), development and testing of interconnection and microgrid equipment, as well as the development and implementation of advanced instrumentation and data acquisition used to analyze the impacts of intermittent renewable resources. Additionally, standards development associated with DG interconnection and analysis as well as Smart Grid interoperability will be discussed.

  2. Nationwide Eclipse Ballooning Project

    NASA Astrophysics Data System (ADS)

    Colman Des Jardins, Angela; Berk Knighton, W.; Larimer, Randal; Mayer-Gawlik, Shane; Fowler, Jennifer; Harmon, Christina; Koehler, Christopher; Guzik, Gregory; Flaten, James; Nolby, Caitlin; Granger, Douglas; Stewart, Michael

    2016-05-01

    The purpose of the Nationwide Eclipse Ballooning Project is to make the most of the 2017 rare eclipse event in four main areas: public engagement, workforce development, partnership development, and science. The Project is focused on two efforts, both student-led: online live video of the eclipse from the edge of space and the study of the atmospheric response to the eclipse. These efforts, however, involving more than 60 teams across the US, are challenging in many ways. Therefore, the Project is leveraging the NASA Space Grant and NOAA atmospheric science communities to make it a success. The first and primary topic of this poster is the NASA Space Grant supported online live video effort. College and high school students on 48 teams from 31 states will conduct high altitude balloon flights from 15-20 locations across the 8/21/2017 total eclipse path, sending live video and images from near space to a national website. Video and images of a total solar eclipse from near space are fascinating and rare. It’s never been done live and certainly not in a network of coverage across a continent. In addition to the live video to the web, these teams are engaged in several other science experiments as secondary payloads. We also briefly highlight the eclipse atmospheric science effort, where about a dozen teams will launch over one hundred radiosondes from across the 2017 path, recording an unprecedented atmospheric data sample. Collected data will include temperature, density, wind, humidity, and ozone measurements.

  3. VSOP-2 project

    NASA Astrophysics Data System (ADS)

    Tsuboi, M.

    2008-07-01

    VSOP-2 project is a next generation Space-VLBI project approved in Institute of Space and Astronautical Science (ISAS) of Japan Aerospace Exploration Agency (JAXA). The nominal launch of the VSOP-2 spacecraft, ASTRO-G, is planed in FY2012 by a HIIA rocket as the 7th astronomy satellite in ISAS/JAXA. ASTRO-G satellite will employ a 9.23-m off-axis deployable reflector antenna (LDR) with a surface accuracy of 0.4 mm rms and cryogenically cooled receivers at 22, and 43 GHz and passively cooled receivers at 8 GHz in dual-polarization. A major axis of the orbit is 35,000 km, which will yield an angular resolution of 38 micro-arcseconds achievable at 43 GHz. Then VSOP-2 can observe innermost regions of AGN jets and astronomical masers at 10 times higher angular resolution compared to the previous Space-VLBI, VSOP(-1). These are ideal laboratories to experience physical phenomena in extreme conditions, which cannot be made in any laboratories on the earth. A phase-referencing capability of ASTRO-G satellite makes dramatic improvement of sensitivity and astrometric measurements possible. Basic design for the mechanical and thermal parts of ASTRO-G itself is on going. The radio telescope including the LDR is in EM phase. We would present the overview of VSOP-2 project.

  4. AIP's Career Pathways Project

    NASA Astrophysics Data System (ADS)

    Avila, Jose

    2014-03-01

    The American Institute of Physics (AIP) Career Pathways Project, funded by the National Science Foundation, aims to increase the number of undergraduates going into STEM careers. The main purposes of this project are to show students the professional opportunities for a STEM career, understand what departments can do to better prepare physics bachelor's degree recipients to enter the workforce, understand what students can do to better prepare themselves, and develop resources based on these findings. I was chosen by the Society of Physics Students (SPS) to be the 2013 summer intern of the AIP's Career Pathways Project. In this talk I will discuss several resources I worked on with the Statistical Research Center of the American Institute of Physics and SPS. These resources include how to write a resume and cover letter, how to perform an informational interview, common job titles for physics bachelors, how to find career information in physics and STEM, how to search and use job postings, and how to network.

  5. Biorefinery projects in China

    SciTech Connect

    Yinging, R.M.; Lambert, R.O.; Barrier, J.W.; Broder, J.D.

    1996-12-31

    YSC Holdings (YSC) is working on a three joint venture project in the Peoples Republic of China to convert cellulosic feedstock such as corn stover to fuels, chemicals and electricity. The Tennessee Valley Authority (TVA) is providing technology and technical assistance for these project to YSC under a contractual agreement. TVA has developed a biorefinery process which uses dilute sulfuric acid hydrolysis technology to convert cellulosic feedstocks to sugars which can then be used to produce chemicals. Lignin, the solid residue of the process can be used as a combustion fuel for production of steam and electricity. The process will accept a variety of feedstocks which include agricultural residues, such as corn stover, sugar cane baggas, wheat straw, wood waste, short rotation woody crops, grass crops, and the cellulosic portion of municipal solid waste (MSW). The primary products of the biorefinery process are ethanol, furfural, and clean burning lignin as a solid boiler fuel. Electricity can also be produced if the price paid for electricity provides a better return on an investment than direct sale of lignin as a boiler fuel. By-products are carbon dioxide, gypsum, and biogas (60% methane). The three plants will each process 1,800 metric ton/day of corn stover. The first plant, in Weifang, China has central government approval. The second and third plants, in Benxi and Jinzhou, China are awaiting local approval. The projected economics for these commercial facilities will be presented.

  6. OCGen Module Mooring Project

    SciTech Connect

    McEntee, Jarlath

    2015-02-06

    Ocean Renewable Power Company's OCGen Module Mooring Project provided an extensive research, design, development, testing and data collection effort and analysis conducted with respect to a positively buoyant, submerged MHK device secured to the seabed using a tensioned mooring system. Different analytic tools were evaluated for their utility in the design of submerged systems and their moorings. Deployment and testing of a prototype OCGen® system provided significant data related to mooring line loads and system attitude and station keeping. Mooring line loads were measured in situ and reported against flow speeds. The Project made a significant step in the development of designs, methodologies and practices related to floating and mooring of marine hydrokinetic (MHK) devices. Importantly for Ocean Renewable Power Company, the Project provided a sound basis for advancing a technically and commercially viable OCGen® Power System. The OCGen® Power System is unique in the MHK industry and, in itself, offers distinct advantages of MHK devices that are secured to the seabed using fixed structural frames. Foremost among these advantages are capital and operating cost reductions and increased power extraction by allowing the device to be placed at the most energetic level of the water column.

  7. Tidd PFBC demonstration project

    SciTech Connect

    Marrocco, M.

    1997-12-31

    The Tidd project was one of the first joint government-industry ventures to be approved by the US Department of Energy (DOE) in its Clean Coal Technology Program. In March 1987, DOE signed an agreement with the Ohio Power Company, a subsidiary of American Electric Power, to refurbish the then-idle Tidd plant on the banks of the Ohio River with advanced pressurized fluidized bed technology. Testing ended after 49 months of operation, 100 individual tests, and the generation of more than 500,000 megawatt-hours of electricity. The demonstration plant has met its objectives. The project showed that more than 95 percent of sulfur dioxide pollutants could be removed inside the advanced boiler using the advanced combustion technology, giving future power plants an attractive alternative to expensive, add-on scrubber technology. In addition to its sulfur removal effectiveness, the plant`s sustained periods of steady-state operation boosted its availability significantly above design projections, heightening confidence that pressurized fluidized bed technology will be a reliable, baseload technology for future power plants. The technology also controlled the release of nitrogen oxides to levels well below the allowable limits set by federal air quality standards. It also produced a dry waste product that is much easier to handle than wastes from conventional power plants and will likely have commercial value when produced by future power plants.

  8. Commuting projections on graphs

    SciTech Connect

    Vassilevski, Panayot S.; Zikatanov, Ludmil T.

    2013-02-19

    For a given (connected) graph, we consider vector spaces of (discrete) functions defined on its vertices and its edges. These two spaces are related by a discrete gradient operator, Grad and its adjoint, ₋Div, referred to as (negative) discrete divergence. We also consider a coarse graph obtained by aggregation of vertices of the original one. Then a coarse vertex space is identified with the subspace of piecewise constant functions over the aggregates. We consider the ℓ2-projection QH onto the space of these piecewise constants. In the present paper, our main result is the construction of a projection π H from the original edge-space onto a properly constructed coarse edge-space associated with the edges of the coarse graph. The projections π H and QH commute with the discrete divergence operator, i.e., we have div π H = QH div. The respective pair of coarse edge-space and coarse vertexspace offer the potential to construct two-level, and by recursion, multilevel methods for the mixed formulation of the graph Laplacian which utilizes the discrete divergence operator. The performance of one two-level method with overlapping Schwarz smoothing and correction based on the constructed coarse spaces for solving such mixed graph Laplacian systems is illustrated on a number of graph examples.

  9. Final Project Report

    SciTech Connect

    Bogucz, E A

    2010-12-13

    This project pursued innovations to improve energy efficiency and indoor environmental quality (IEQ) in commercial and residential buildings. For commercial buildings, the project developed a testbed for “intelligent nested environmental systems technologies (iNEST),” which monitor and control energy flows and IEQ across a cascade of spaces from individuals’ desktops to office suites to floors to whole buildings. An iNEST testbed was constructed at Syracuse University and was used to assess the use of devices such as personal badges and CO2 sensors to study how reduced energy use and improved IEQ could be achieved. For residential buildings, resources were targeted in support of DoE’s Builders Challenge Program and to recruit Syracuse, NY builders. Three homes in Syracuse’s Near Westside neighborhood were also registered under the program by Syracuse University team, with an additional home registered by one of the builders. Findings from the work at the iNEST testbed facility, and results from other related projects were disseminated through Syracuse Center of Excellence in Environmental and Energy Systems (SyracuseCoE) 2008 Annual Symposium, the 9th International Healthy Buildings 2009 Conference & Exhibition, and through SyracuseCoE’s website and eNewsletters to inform the broader community of researchers, designers and builders. These public communication activities helped enhance the understanding of high performance buildings and facilitate further market acceptance.

  10. AAS Oral History Project

    NASA Astrophysics Data System (ADS)

    Buxner, Sanlyn; Holbrook, Jarita; AAS Oral History Team

    2016-06-01

    Now in its fourth year, the AAS Oral History Project has interviewed over 80 astronomers from all over the world. Led by the AAS Historical Astronomy Division (HAD) and partially funded by the American Institute of Physics Niels Bohr Library and ongoing support from the AAS, volunteers have collected oral histories from astronomers at professional meetings starting in 2015, including AAS, DPS, and the IAU general assembly. Each interview lasts one and a half to two hours and focuses on interviewees’ personal and professional lives. Questions include those about one’s family, childhood, strong influences on one’s scientific career, career path, successes and challenges, perspectives on how astronomy is changing as a field, and advice to the next generation. Each interview is audio recorded and transcribed, the content of which is checked with each interviewee. Once complete, interview transcripts are posted online as part of a larger oral history library at https://www.aip.org/history-programs/niels-bohr-library/oral-histories. Future analysis will reveal a rich story of astronomers and will help the community address issues of diversity, controversies, and the changing landscape of science. We are still recruiting individuals to be interviewed from all stages of career from undergraduate students to retired and emeritus astronomers. Contact Jarita Holbrook to schedule an interview or to find out more information about the project (astroholbrook@gmail.com). Also, contact Jarita Holbrook if you would like to become an interviewer for the project.

  11. Milliwatt Generator Project

    NASA Astrophysics Data System (ADS)

    Latimer, T. W.; Rinehart, G. H.

    1992-05-01

    This report covers progress on the Milliwatt Generator Project from April 1986 through March 1988. Activities included fuel processing and characterization, production of heat sources, fabrication of pressure-burst test units, compatibility studies, impact testing, and examination of surveillance units. The major task of the Los Alamos Milliwatt Generator Project is to fabricate MC2893A heat sources (4.0 W) for MC2730A radioisotope thermoelectric generators (RTG's) and MC3599 heat sources (4.5 W) for MC3500 RTG's. The MWG Project interfaces with the following contractors: Sandia National Laboratories, Albuquerque (designer); E.I. du Pont de Nemours and Co. (Inc.), Savannah River Plant (fuel); Monsanto Research Corporation, Mound Facility (metal hardware); and General Electric Company, Neutron Devices Department (RTG's). In addition to MWG fabrication activities, Los Alamos is involved in (1) fabrication of pressure-burst test units, (2) compatibility testing and evaluation, (3) examination of surveillance units, and (4) impact testing and subsequent examination of compatibility and surveillance units.

  12. Surfactant EOR project evaluated

    SciTech Connect

    Holm, L.W.

    1984-07-16

    The Union Oil Co.'s Uniflood process has successfully mobilized and produced tertiary oil from a micellar-polymer pilot project on the Hegberg lease in the El Dorado field, Kansas. This half-completed EOR flood has recovered over 11% of the waterflood residual oil and is currently producing at an oil cut of 10%. Oil recovery has been limited by (1) the presence of gypsum in portions of the reservoir which adversly affects injected chemicals, (2) poor quality reservoir rock in one quadrant of the pilot, and (3) a substantial fluid drift (30 ft/year) which causes a portion of the injected chemicals to flow out of the pilot pattern. The El Dorado demonstration project is a joint experiment covered by a cost-sharing contract between the U.S. Department of Energy and Cities Service Company. It was proposed as a micellar-polymer process in a highly saline (10 wt % salts) reservoir that had been waterflooded to residual oil. Despite the extended project life, and indications that total recovery efficiency will be less than originally predicted, oil response in the Hegberg pattern is encouraging for application of the micellar-polymer process in high brine reservoirs.

  13. Cohort Profile: Project Viva

    PubMed Central

    Oken, Emily; Baccarelli, Andrea A; Gold, Diane R; Kleinman, Ken P; Litonjua, Augusto A; De Meo, Dawn; Rich-Edwards, Janet W; Rifas-Shiman, Sheryl L; Sagiv, Sharon; Taveras, Elsie M; Weiss, Scott T; Belfort, Mandy B; Burris, Heather H; Camargo, Carlos A; Huh, Susanna Y; Mantzoros, Christos; Parker, Margaret G; Gillman, Matthew W

    2015-01-01

    We established Project Viva to examine prenatal diet and other factors in relation to maternal and child health. We recruited pregnant women at their initial prenatal visit in eastern Massachusetts between 1999 and 2002. Exclusion criteria included multiple gestation, inability to answer questions in English, gestational age ≥22 weeks at recruitment and plans to move away before delivery. We completed in-person visits with mothers during pregnancy in the late first (median 9.9 weeks of gestation) and second (median 27.9 weeks) trimesters. We saw mothers and children in the hospital during the delivery admission and during infancy (median age 6.3 months), early childhood (median 3.2 years) and mid-childhood (median 7.7 years). We collected information from mothers via interviews and questionnaires, performed anthropometric and neurodevelopmental assessments and collected biosamples. We have collected additional information from medical records and from mailed questionnaires sent annually to mothers between in-person visits and to children beginning at age 9 years. From 2341 eligible women, there were 2128 live births; 1279 mother-child pairs provided data at the mid-childhood visit. Primary study outcomes include pregnancy outcomes, maternal mental and cardiometabolic health and child neurodevelopment, asthma/atopy and obesity/cardiometabolic health. Investigators interested in learning more about how to obtain Project Viva data can contact Project_Viva@hphc.org. PMID:24639442

  14. ISIS and META projects

    NASA Technical Reports Server (NTRS)

    Birman, Kenneth; Cooper, Robert; Marzullo, Keith

    1990-01-01

    ISIS and META are two distributed systems projects at Cornell University. The ISIS project, has developed a new methodology, virtual synchrony, for writing robust distributed software. This approach is directly supported by the ISIS Toolkit, a programming system that is distributed to over 300 academic and industrial sites. Several interesting applications that exploit the strengths of ISIS, including an NFS-compatible replicated file system, are being developed. The META project, is about distributed control in a soft real time environment incorporating feedback. This domain encompasses examples as diverse as monitoring inventory and consumption on a factory floor and performing load-balancing on a distributed computing system. One of the first uses of META is for distributed application management: the tasks of configuring a distributed program, dynamically adapting to failures, and monitoring its performance. Recent progress and current plans are presented. This approach to distributed computing, a philosophy that is believed to significantly distinguish the work from that of others in the field, is explained.

  15. The Open AUC Project.

    PubMed

    Cölfen, Helmut; Laue, Thomas M; Wohlleben, Wendel; Schilling, Kristian; Karabudak, Engin; Langhorst, Bradley W; Brookes, Emre; Dubbs, Bruce; Zollars, Dan; Rocco, Mattia; Demeler, Borries

    2010-02-01

    Progress in analytical ultracentrifugation (AUC) has been hindered by obstructions to hardware innovation and by software incompatibility. In this paper, we announce and outline the Open AUC Project. The goals of the Open AUC Project are to stimulate AUC innovation by improving instrumentation, detectors, acquisition and analysis software, and collaborative tools. These improvements are needed for the next generation of AUC-based research. The Open AUC Project combines on-going work from several different groups. A new base instrument is described, one that is designed from the ground up to be an analytical ultracentrifuge. This machine offers an open architecture, hardware standards, and application programming interfaces for detector developers. All software will use the GNU Public License to assure that intellectual property is available in open source format. The Open AUC strategy facilitates collaborations, encourages sharing, and eliminates the chronic impediments that have plagued AUC innovation for the last 20 years. This ultracentrifuge will be equipped with multiple and interchangeable optical tracks so that state-of-the-art electronics and improved detectors will be available for a variety of optical systems. The instrument will be complemented by a new rotor, enhanced data acquisition and analysis software, as well as collaboration software. Described here are the instrument, the modular software components, and a standardized database that will encourage and ease integration of data analysis and interpretation software.

  16. Status of NICA project

    SciTech Connect

    Meshkov, I. N.

    2012-05-15

    The project of Nuclotron-based Ion Collider fAcility NICA/MPD (+MultiPurpose Detector) under development at JINR (Dubna) is presented. The general goals of the project are providing of colliding beams for experimental studies of both hot and dense strongly interacting baryonicmatter and search for the mixed phase and critical endpoint and spin physics in collisions of polarized protons (deuterons). The first program requires providing of heavy-ion collisions in the energy range of {radical}s{sub NN} = 4 - 11 GeV at average luminosity of L = 1 Multiplication-Sign 10{sup 27} cm{sup -2} s{sup -1} for {sup 197}Au{sup 79+}. The polarized beams mode is proposed to be used in energy range of {radical}s = 12 - 27 GeV (protons) at luminosity of L {>=} 1 Multiplication-Sign 10{sup 30} cm{sup -2} s{sup -1}. The report contains description of the facility scheme and characteristics in heavy-ion operation mode, status and plans of the project development.

  17. The Manhattan Project

    NASA Astrophysics Data System (ADS)

    Reed, B. Cameron

    2014-10-01

    The Manhattan Project was the United States Army’s program to develop and deploy nuclear weapons during World War II. In these devices, which are known popularly as ‘atomic bombs’, energy is released not by a chemical explosion but by the much more violent process of fission of nuclei of heavy elements via a neutron-mediated chain-reaction. Three years after taking on this project in mid-1942, the Army’s Manhattan Engineer District produced three nuclear bombs of two different designs. Two of these devices were fueled with the 239 isotope of the synthetic element plutonium, while the third employed the rare 235 isotope of uranium. One of the plutonium devices, code-named Trinity, was detonated in a test in southern New Mexico on 16 July 1945; this was the world’s first nuclear explosion. Three weeks later, on 6 August, the uranium bomb, Little Boy, was dropped on the Japanese city of Hiroshima. On 9 August the second plutonium device, Fat Man, was dropped on Nagasaki. Together, the two bombings killed over 100 000 people and were at least partially responsible for the Japanese government’s 14 August decision to surrender. This article surveys, at an undergraduate level, the science and history of the Manhattan Project.

  18. Milliwatt Generator Project

    SciTech Connect

    Latimer, T.W.; Rinehart, G.H.

    1992-05-01

    This report covers progress on the Milliwatt Generator Project from April 1986 through March 1988. Activities included fuel processing and characterization, production of heat sources, fabrication of pressure-burst test units, compatibility studies, impact testing, and examination of surveillance units. The major task of the Los Alamos Milliwatt Generator Project is to fabricate MC2893A heat sources (4.0 W) for MC2730A radioisotope thermoelectric generators (RTGS) and MC3599 heat sources (4.5 W) for MC3500 RTGs. The MWG Project interfaces with the following contractors: Sandia National Laboratories, Albuquerque (designer); E.I. du Pont de Nemours and Co. (Inc.), Savannah River Plant (fuel); Monsanto Research Corporation, Mound Facility (metal hardware); and General Electric Company, Neutron Devices Department (RTGs). In addition to MWG fabrication activities, Los Alamos is involved in (1) fabrication of pressure-burst test units, (2) compatibility testing and evaluation, (3) examination of surveillance units, and (4) impact testing and subsequent examination of compatibility and surveillance units.

  19. Final project report

    SciTech Connect

    Nitin S. Baliga and Leroy Hood

    2008-11-12

    The proposed overarching goal for this project was the following: Data integration, simulation and visualization will facilitate metabolic and regulatory network prediction, exploration, and formulation of hypotheses. We stated three specific aims to achieve the overarching goal of this project: (1) Integration of multiple levels of information such as mRNA and protein levels, predicted protein-protein interactions/associations and gene function will enable construction of models describing environmental response and dynamic behavior. (2) Flexible tools for network inference will accelerate our understanding of biological systems. (3) Flexible exploration and queries of model hypotheses will provide focus and reveal novel dependencies. The underlying philosophy of these proposed aims is that an iterative cycle of experiments, experimental design, and verification will lead to a comprehensive and predictive model that will shed light on systems level mechanisms involved in responses elicited by living systems upon sensing a change in their environment. In the previous years report we demonstrated considerable progress in development of data standards, regulatory network inference and data visualization and exploration. We are pleased to report that several manuscripts describing these procedures have been published in top international peer reviewed journals including Genome Biology, PNAS, and Cell. The abstracts of these manuscripts are given and they summarize our accomplishments in this project.

  20. The NALTA Project

    NASA Astrophysics Data System (ADS)

    Pinfold, James

    2002-05-01

    The aim of the NALTA project is to create a North America wide Network of of sparse large area cosmic ray time coincidence array with an unprecedented collection area. This innovative project is driven by a collaboration of high-schools, colleges and universities and combines in a uniqueway fundamental research with a strong educational and training component. NALTA is a project that involves high-tech elements such as: computerized DAQ; a computer network to acquire, analyze and disseminate information; specialized WWW application for knowledge processing; sophisticated detectors and readout electronics; and, last but not least the use of the Global Positioning Satellite (GPS) system for precise timing over large area. It is envisaged that the NALTA array will eventually involve over a hundred high-schools and colleges across North America. Most of these schools will have cosmic ray detector systems deployed on their grounds. The NALTA network will be used to search at a new frontier: for correlated very large area cosmic ray air-shower phenomena using the Global Positioning Satellite system. Operating in a "singles" mode the CANLACT array can also measure the soft cosmic ray flux primarily from the Sun, to provide a cosmic ray " solar cosmic ray weather report".

  1. Guiding Students in Project Work.

    ERIC Educational Resources Information Center

    Housley, James M.

    1995-01-01

    Outlines and illustrates the Dartmouth approach to developing a science project. This problem-solving approach, promoted by the Thayer School of Engineering at Dartmouth College, helps teachers in guiding students in all phases of project work. (JRH)

  2. MISR Regional SAMUM Map Projection

    Atmospheric Science Data Center

    2013-06-26

    ... Longitude of projection center -10° 00' 00.00" Latitude of projection center 32° 19' 33.08" False easting ... metadata (but see comments below about spherical vs. WGS-84 latitude). General Cartographic Transformation Package (GCTP) Library ...

  3. MISR Regional VBBE Map Projection

    Atmospheric Science Data Center

    2013-03-26

    ... of projection center 106° 00' 00.00" Latitude of projection center 4° 58' 00.10" False ... metadata (but see comments below about spherical vs. WGS-84 latitude). General Cartographic Transformation Package (GCTP) Library ...

  4. Class Projects on the Internet.

    ERIC Educational Resources Information Center

    Nicholson, Danny

    1996-01-01

    Discusses the use of the Internet in the classroom. Presents a project on renewable energy sources in which students produce web pages. Provides the web page address of the project completed by students. (ASK)

  5. Project-Based Teaching: Helping Students Make Project Connections

    NASA Astrophysics Data System (ADS)

    Johnson, Heather Jo Pusich

    Project-based curriculum materials are designed to support students in engaging with scientific content and practices in meaningful ways, with the goal of improving students' science learning. However, students need to understand the connections between what they are doing on a day-to-day basis with respect to the goals of the overall project for students to get the motivational and cognitive benefits of a project-based approach. In this dissertation, I looked at the challenges that four ninth grade science teachers faced as they helped students to make these connections using a project-based environmental science curriculum. The analysis revealed that in general when the curriculum materials made connections explicit, teachers were better able to articulate the relationship between the lesson and the project during enactment. However, whether the connections were explicit or implicit in the materials, enactments of the same lesson across teachers revealed that teachers leveraged different aspects of the project context in different ways depending on their knowledge, beliefs, and goals about project-based teaching. The quantitative analysis of student data indicated that when teacher enactments supported project goals explicitly, students made stronger connections between a lesson and the project goal. Therefore, a teacher's ability to make clear connections during classroom instruction is essential. Furthermore, when students made connections between each lesson and the larger project goals their attitudes toward the lesson were more positive and they performed better on the final assessment. These findings suggest that connections between individual lessons and the goals of the project are critical to the effectiveness of project-based learning. This study highlights that while some teachers were able to forge these connections successfully as a result of leveraging cognitive resources, teachers' beliefs, knowledge and goals about project-based teaching are

  6. Smart Grid Demonstration Project

    SciTech Connect

    Miller, Craig; Carroll, Paul; Bell, Abigail

    2015-03-11

    The National Rural Electric Cooperative Association (NRECA) organized the NRECA-U.S. Department of Energy (DOE) Smart Grid Demonstration Project (DE-OE0000222) to install and study a broad range of advanced smart grid technologies in a demonstration that spanned 23 electric cooperatives in 12 states. More than 205,444 pieces of electronic equipment and more than 100,000 minor items (bracket, labels, mounting hardware, fiber optic cable, etc.) were installed to upgrade and enhance the efficiency, reliability, and resiliency of the power networks at the participating co-ops. The objective of this project was to build a path for other electric utilities, and particularly electrical cooperatives, to adopt emerging smart grid technology when it can improve utility operations, thus advancing the co-ops’ familiarity and comfort with such technology. Specifically, the project executed multiple subprojects employing a range of emerging smart grid technologies to test their cost-effectiveness and, where the technology demonstrated value, provided case studies that will enable other electric utilities—particularly electric cooperatives— to use these technologies. NRECA structured the project according to the following three areas: Demonstration of smart grid technology; Advancement of standards to enable the interoperability of components; and Improvement of grid cyber security. We termed these three areas Technology Deployment Study, Interoperability, and Cyber Security. Although the deployment of technology and studying the demonstration projects at coops accounted for the largest portion of the project budget by far, we see our accomplishments in each of the areas as critical to advancing the smart grid. All project deliverables have been published. Technology Deployment Study: The deliverable was a set of 11 single-topic technical reports in areas related to the listed technologies. Each of these reports has already been submitted to DOE, distributed to co-ops, and

  7. Null lifts and projective dynamics

    SciTech Connect

    Cariglia, Marco

    2015-11-15

    We describe natural Hamiltonian systems using projective geometry. The null lift procedure endows the tangent bundle with a projective structure where the null Hamiltonian is identified with a projective conic and induces a Weyl geometry. Projective transformations generate a set of known and new dualities between Hamiltonian systems, as for example the phenomenon of coupling-constant metamorphosis. We conclude outlining how this construction can be extended to the quantum case for Eisenhart–Duval lifts.

  8. Global Project Management: Graduate Course

    DTIC Science & Technology

    2006-01-01

    business and if the project will have successful performance. In the final project presentation, the student should address what countries they may...the idiosyncrasies of different countries in an effort to plan a successful global project execution. Alternate schedule. This class may be used for...required? * Will religious factors influence the project? 24-Mar-06 ENCE ft 24 13 GP Characteristics * Multiple Time Zones * Exchange rates * Long

  9. Managing a project's legacy: implications for organizations and project management

    NASA Technical Reports Server (NTRS)

    Cooper, Lynne P.; Hecht, Michael H.; Majchrzak, Ann

    2003-01-01

    Organizations that rely on projects to implement their products must find effective mechanisms for propagating lessons learned on one project throughout the organization. A broad view of what constitutes a project's 'legacy' is presented that includes not just the design products and leftover parts, but new processes, relationships, technology, skills, planning data, and performance metrics. Based on research evaluating knowledge reuse in innovative contexts, this paper presents an approach to project legacy management that focuses on collecting and using legacy knowledge to promote organizational learning and effective reuse, while addressing factors of post-project responsibility, information obsolescence, and the importance of ancillary contextual information. .

  10. Project Management in Higher Education

    ERIC Educational Resources Information Center

    Alpert, Shannon Atkinson

    2011-01-01

    This study identified factors that influenced the use of project management in higher education research projects. Using a qualitative grounded theory approach that included in-depth interviews with assistant professors, the researcher examined how these individuals were using project management processes and tools and factors that enabled,…

  11. IPRO--InterProfessional Project.

    ERIC Educational Resources Information Center

    Chang, Morris; Luh, Ding Bang

    The ability to work with different professions in a project-oriented setting is critical to today's engineering education. InterProfession (IPRO) projects, a three-credit course at the Illinois Institute of Technology, are integrated into the curriculum. Through these industry-sponsored projects, students will deal with real world engineering…

  12. HARVARD PROJECT PHYSICS PROGRESS REPORT.

    ERIC Educational Resources Information Center

    Harvard Univ., Cambridge, MA.

    THIS REPORT OF HARVARD PROJECT PHYSICS PRESENTS DRAFTS OF THREE SPEECHES DELIVERED TO THE AMERICAN ASSOCIATION OF PHYSICS TEACHERS (AAPT) MEETING, FEBRUARY, 1967. THE ADDRESS BY GERALD HOLTON DEALS WITH THE AIMS AND PROGRESS OF THE PROJECT. DISCUSSED ARE (1) PROJECT PARTICIPANTS, (2) AIMS AND CONTENT, (3) THE NEW EMPHASIS, (4) SURVEY OF COURSE…

  13. The Fleming Applied Projects Program

    ERIC Educational Resources Information Center

    Spasov, Peter

    2004-01-01

    Applied Projects is a program where every technology student engages in an intensive team project full time during the final academic semester. A wide range of enterprises provide the real-world problems that form the basis of student projects. This article describes the program and how Fleming College uses this program for applied research. To…

  14. Project-Based Module Development.

    ERIC Educational Resources Information Center

    Meel, R. M. van

    A project management design for modularizing higher education at open universities was developed and tested. Literature in the fields of project management and development of modular curriculum materials was reviewed and used as a basis for developing a project-based approach to the process of developing modules for self-instruction. According to…

  15. 6 Project-Management Tips

    ERIC Educational Resources Information Center

    Demski, Jennifer

    2012-01-01

    When it comes to project management, the IT department is typically its own worst enemy. When project requests are pushed through the budgeting process by different departments, it's up to IT to make them all work. The staff is required to be "heroic" to get the project load done. People get to work over weekends and postpone their vacations. The…

  16. Advanced Energy Projects, FY 1993

    NASA Astrophysics Data System (ADS)

    1993-09-01

    AEP has been supporting research on novel materials for energy technology, renewable and biodegradable materials, new uses for scientific discoveries, alternate pathways to energy efficiency, alternative energy sources, innovative approaches to waste treatment and reduction, etc. The summaries are grouped according to projects active in FY 1993, Phase 1 SBIR projects, and Phase 2 SBIR projects. Investigator and institutional indexes are included.

  17. Classification of Software Projects' Complexity

    NASA Astrophysics Data System (ADS)

    Fitsilis, P.; Kameas, A.; Anthopoulos, L.

    Software project complexity is a subject that has not received detailed attention. The purpose of this chapter is to present a systematic way for studying and modeling software project complexity. The proposed model is based on the widely known and accepted Project Management Body of Knowledge and it uses a typology for modeling complexity based on complexity of faith, fact, and interaction.

  18. Project WORKSMART. A Final Report.

    ERIC Educational Resources Information Center

    NashvilleREAD, Nashville, TN.

    Project WORKSMART was a Nashville, Tennessee-based workplace literacy project to provide an exemplary multidimensional workplace literacy program while simultaneously demonstrating products and practices that promote lifelong learning that can be customized and replicated in diverse work environments. The project was a partnership between…

  19. Teacher-Initiated Telecommunications Projects.

    ERIC Educational Resources Information Center

    Dyrli, Odvard Egil

    1995-01-01

    A collection of teacher-initiated telecommunication projects for use in elementary and secondary schools. Projects utilize electronic mail and the Internet to help students communicate with peers in class and all over the world, with scientists in the South Pole, researchers in Australia, and WWII veterans. Project descriptions include electronic…

  20. Astro tourism: Astro Izery project

    NASA Astrophysics Data System (ADS)

    Mrozek, Tomasz; Kołomański, Sylwester; Żakowicz, Grzegorz; Kornafel, Stanisław; Czarnecki, Tomasz L.; Suchan, Pavel; Kamiński, Zbigniew

    2015-03-01

    The Astro Izery project is carried by several institutions from Poland and Czech Republic. Its aim is to educate and inform tourists, who visit the Izery Mountains, about astronomy and light pollution. The project consists of two activities: permanent (sundials, planetary path etc.) and periodic (meetings, workshops). After five years the project is in good health and will gain more elements in next years.

  1. West Hackberry Tertiary Project

    SciTech Connect

    Kenneth Haley; Travis Gillham; Demetrios Yannimaras

    1999-03-31

    The West Hackberry Tertiary Project is a field test of the concept that air injection can be combined with the Double Displacement Process to produce a tertiary recovery process that is both low cost and economic at current oil prices. The Double Displacement Process is the gas displacement of a water invaded oil column for the purpose of recovering tertiary oil by gravity drainage. In reservoirs with pronounced bed dip such as those found in West Hackberry and other Gulf Coast salt dome fields, reservoir performance has shown that gravity drainage recoveries average 80% to 90% of the original oil in place while waterdrive recoveries average 50% to 60% of the original oil in place. The target for tertiary oil recovery in the Double Displacement Process is the incremental oil between the 50% to 60% waterdrive recoveries and the 80% to 90% gravity drainage recoveries. In previous field tests, the Double Displacement Process has proven successful in generating tertiary oil recovery. The use of air injection in this process combines the benefits of air's low cost and universal accessibility with the potential for accelerated oil recovery from the combustion process. If successful, this project will demonstrate that utilizing air injection in the Double Displacement Process will result in an economically viable tertiary process in reservoirs (such as Gulf Coast salt dome reservoirs) where any other tertiary process is presently uneconomic. Air injection on the West Hank began in November of 1994. Although West Flank air injection has increased reservoir pressure by 500 pounds per square inch (psi), production response has not yet occurred. The gas cap on the West Flank has not expanded sufficiently to push the oil rim down to the nearest down structure well. Cumulative injection to date is 1.6 BCF, only approximately 50% of the projected volume required to establish oil production response. Additional air injection is required to further expand the gas cap and thereby

  2. Circum-Atlantic Project

    SciTech Connect

    Teleki, P.; Edgar, T. )

    1990-06-01

    Inspired by the success and value of the maps prepared by the Circum-Pacific Council for Energy and Mineral Resources, the International Union of Geological Sciences (IUGS) initiated the Circum-Atlantic Project (CAP) in 1987. The project is co-sponsored by the Commission for the Geological Map of the World (CGMW). Objectives of CAP are to help organize, coordinate, and stimulate the compilation and interpretation of geological, geophysical, and resources data for the Atlantic Ocean basin and adjacent continental areas and to publish these data in an integrated map series. Four regional working groups, one each for the eastern North Atlantic, western North Atlantic, eastern South Atlantic, and western South Atlantic areas have been organized, and within each of these groups specialty teams are being established to compile and interpret various types of geologic data. Based on a digital compilation of these data, a series of geologic thematic maps are planned to be prepared and displayed on a single sheet, at a scale of 1:17,000,000, for the entire Atlantic basin, and on four quadrant sheets, at a scale of 1:10,000,000. The quadrants correspond to the North-, Tethyan-, Central-, and South-Atlantic areas. The thematic series will consist of bathymetric, geologic, tectonic, magnetic, gravity, and mineral and energy resource maps. In addition, several palinspastic maps are planned to be constructed to display the geologic development of the Atlantic basin at eight geologic time periods. Transects will accompany all maps. The CAP plans support pilot projects that fit the scope and objectives of this undertaking.

  3. The EEE Project

    NASA Astrophysics Data System (ADS)

    Abbrescia, M.; An, S.; Antolini, R.; Badala, A.; Baldini Ferroli, R.; Bencivenni, G.; Blanco, F.; Bressan, E.; Chiavassa, A.; Chiri, C.; Cifarelli, L.; Cindolo, F.; Coccia, E.; de Pasquale, S.; di Giovanni, A.; d'Incecco, M.; Fabbri, F.L.; Frolov, V.; Garbini, M.; Gustavino, C.; Hatzifotiadou, D.; Imponente, G.; Kim, J.; La Rocca, P.; Librizzi, F.; Maggiora, A.; Menghetti, H.; Miozzi, S.; Moro, R.; Panareo, M.; Pappalardo, G.S.; Piragino, G.; Riggi, F.; Romano, F.; Sartorelli, G.; Sbarra, C.; Selvi, M.; Serci, S.; WIlliams, C.; Zichichi, A.; Zuyenski, R.

    The EEE (/Extreme Energy Event/) Project is an experiment for the study of very high-energy extensive air showers, actually starting in Italy. It is based on the detection of the shower muon component by means of a network of tracking detectors, installed in Italian High Schools. The Project, supported by the Ministero dell’Università e della Ricerca (MIUR), Istituto Nazionale di Fisica Nucleare (INFN), European Organization for Nuclear Research (CERN) and Museo Storico della Fisica e Centro Studi e Ricerche “E. Fermi” has been conceived by its leader Professor Antonino Zichichi. In its first phase the detector telescopes will be installed in 21 High Schools in 7 piloting cities all over Italy. The network will soon be heavily upgraded by increasing the number of High Schools and cities. The single tracking telescope is composed by 3 large (~ 2 m2 ) Multi-gap Resistive Plate Chambers (MRPC), realized with float glass electrodes. The use of particle detectors based on such MRPCs will allow to determine with a very high accuracy the direction of the axis of cosmic ray showers initiated by primaries of ultra-high energy, together with a high temporal resolution. The first MRPC telescope, installed in the Liceo Scientifico “B.Touschek” in Grottaferrata near the LNF-INFN site (nearby Rome), is successfully running. By the end of year 2007, the installation of the other telescopes will open the way for the first search of high-energy cosmic rays distant coincidences. In the future, serving many High Schools scattered all over the Italian territory, the EEE Project will also allow to investigate coincidences between multiple primaries producing distant showers. Here we present the experimental apparatus and its tasks.

  4. Final project report

    SciTech Connect

    Podzorov, Vitaly

    2012-10-28

    The scope of this project is to investigate fundamental aspects of self-assembled monolayers (SAMs) grown at the surface of organic semiconductors and other electronic materials, recently discovered in our group (Fig. 1) [1]. Understanding the growth mechanism and structure of these SAMs, as well as investigating the effect of SAM-induced high surface conductivity, are the main thrusts of the project. An additional thrust of the project is to find new ways of surface doping or surface gating of novel semiconductors, in which electronic traps at the interface would be passivated. Molecular self assembly is an exciting research area of modern materials science, playing an important role in a variety of emerging applications, such as organic and molecular electronics, bioengineering, sensors and actuators. The current effort in this field has been focused on two experimental platforms: SAMs on metals (e.g., Au) and SAMs on inorganic oxides (e.g., SiO2). We have recently discovered the third platform, molecular self-assembly at the surface of carbon-based electronic materials (organic semiconductors, graphene and CNTs), which opens new opportunities for fundamental research and applications (Fig. 1) [1, 2, 3]. One of the most intriguing aspects of the new discovery is that formation of an FTS self-assembled monolayer on these materials induces a high-density mobile charges, with n up to 1014 cm-2, resulting in a large surface conductivity, σ ≈ 10-5 S·square-1 [1]. The effect is due to an interfacial electron transfer from the semiconductor to the SAM, resulting in a 0.54 V potential drop across the 1.3 nm-thick SAM, as recently revealed by Kelvin probe microscopy in rubrene [4].

  5. Planning Complex Projects Automatically

    NASA Technical Reports Server (NTRS)

    Henke, Andrea L.; Stottler, Richard H.; Maher, Timothy P.

    1995-01-01

    Automated Manifest Planner (AMP) computer program applies combination of artificial-intelligence techniques to assist both expert and novice planners, reducing planning time by orders of magnitude. Gives planners flexibility to modify plans and constraints easily, without need for programming expertise. Developed specifically for planning space shuttle missions 5 to 10 years ahead, with modifications, applicable in general to planning other complex projects requiring scheduling of activities depending on other activities and/or timely allocation of resources. Adaptable to variety of complex scheduling problems in manufacturing, transportation, business, architecture, and construction.

  6. STEAM GENERATOR GROUP PROJECT

    SciTech Connect

    Clark, R. A.; Lewis, M

    1985-09-01

    This report is a summary of progress in the Surry Steam Generator Group Project for 1984. Information is presented on the analysis of two baseline eddy current inspections of the generator. Round robin series of tests using standard in-service inspection techniques are described along with some preliminary results. Observations are reported of degradation found on tubing specimens removed from the generator, and on support plates characterized in-situ. Residual stresses measured on a tubing specimen are reported. Two steam generator repair demonstrations are described; one for antivibration bar replacement, and one on tube repair methods. Chemical analyses are shown for sludge samples removed from above the tube sheet.

  7. Dynamic Underground Stripping Project

    SciTech Connect

    Aines, R.; Newmark, R.; McConachie, W.; Udell, K.; Rice, D.; Ramirez, A.; Siegel, W.; Buettner, M.; Daily, W.; Krauter, P.; Folsom, E.; Boegel, A.J.; Bishop, D.; Udell, K.

    1992-01-01

    LLNL is collaborating with the UC Berkeley College of Engineering to develop and demonstrate a system of thermal remediation and underground imaging techniques for use in rapid cleanup of localized underground spills. Called ``Dynamic Stripping`` to reflect the rapid and controllable nature of the process, it will combine steam injection, direct electrical heating, and tomographic geophysical imaging in a cleanup of the LLNL gasoline spill. In the first 8 months of the project, a Clean Site engineering test was conducted to prove the field application of the techniques before moving the contaminated site in FY 92.

  8. Tomcat-Projects_RF

    SciTech Connect

    Warrant, Marilyn M.; Garcia, Rudy J.; Zhang, Pengchu; Arms, Robert M.; Herzer, John A.; Conrad, Gregory N.; Brabson, John M.

    2004-09-15

    Tomcat-Projects_RF is a software package for analyzing sensor data obtained from a database and displaying the results with Java Servlet Pages (JSP). SQL Views into the dataset are tailored for personnel having different roles in monitoring the items in a storage facility. For example, an inspector, a host treaty compliance officer, a system engineer and software developers were the users identified that would need to access data at different levels of detail, The analysis provides a high level status of the storage facility and allows the user to go deeper into the data details if the user desires.

  9. The Lesbian Art Project.

    PubMed

    Klein, Jennie

    2010-01-01

    Critics and artists influenced by the tenets of queer theory have dismissed much of the artwork made in the 1970s from a lesbian feminist perspective. The result has been very little being known or written about this pioneering work. This article is concerned with exploring an often overlooked aspect of lesbian art history: the activities and events associated with the Lesbian Art Project (LAP) founded by Terry Wolverton and Arlene Raven at the Woman's Building in Los Angeles. I argue that what is most significant about the LAP is the way in which the participants articulated lesbian identity and lesbian community through performance, art making, and writing.

  10. Project Earth Lover

    SciTech Connect

    Slobotski, Stephanie,

    2011-09-01

    Under this project, the Ponca Tribe of Nebraska (PTN) will conduct An Energy Options Analysis (EOA) to empower Tribal Leadership with critical information to allow them to effectively screen energy options that will further develop the Tribe's long-term strategic plan and energy vision. The PTN will also provide community workshops to enhance Tribal Members' capabilities, skills and awareness of energy efficiency and conservation technology and practices. A 90- minute workshop will be conducted at each of the 5 sites and one-hundred tribal members will receive an erergy efficiency kit.

  11. NDLGS project update

    SciTech Connect

    Lienert, Thomas J; Sutton, Jacob O; Piltch, Martin S; Lujan, Dennis J

    2011-01-14

    Recent results for laser and ESD processing for the NDLGS project will be reviewed. Conclusions are: (1) Short mix passes have profound effect on window T; (2) Multiple drill and re-weld at single location has been shown to be feasible and successful; (3) Kapton beam profiling method has been successfully developed. Comparison of 100 mm and 120 mm lenses gives reasonable and consistent results; (4) Manifold pumpdown data has been presented; (5) ESO results can be accurately predicted once a repeatable efficiency has been established; and (6) The electrode-workpiece geometry may play an important on ESO efficiency. Experiments are planned to investigate these effects.

  12. Hawaii geothermal project

    NASA Technical Reports Server (NTRS)

    Kamins, R. M.

    1974-01-01

    Hawaii's Geothermal Project is investigating the occurrence of geothermal resources in the archipelago, initially on the Island of Hawaii. The state's interest in geothermal development is keen, since it is almost totally dependent on imported oil for energy. Geothermal development in Hawaii may require greater participation by the public sector than has been true in California. The initial exploration has been financed by the national, state, and county governments. Maximization of net benefits may call for multiple use of geothermal resources; the extraction of by-products and the application of treated effluents to agricultural and aquacultural uses.

  13. The RHIC project

    SciTech Connect

    Harrison, M.A.

    1996-07-01

    The design and construction status of the Relativistic Heavy Ion collider (RHIC) is discussed. Those novel features of a heavy ion collider that are distinct from hadron colliders in general are noted. These features are derived from the experimental requirements of operation with a variety of ion species over a wide energy range including collisions between ions of unequal energies. The project is in the fourth year of a seven year construction cycle. A review of the superconducting magnet program is given together with progress to date on the machine construction.

  14. Bonanza project, 1971

    NASA Technical Reports Server (NTRS)

    Lee, K.

    1972-01-01

    Research on the application of remote sensing techniques to the mineral industry stresses photointerpretation by human interpreter experienced in the extraction of geological information from aerial color and multiband photographs and from thermal scanner imagery. Also considered are optical and digital image enhancement, multiband color additive projection, video image processing, and computer reduction and analysis of infrared spectrometry. Evaluation of those parameters which have the most contrast between adjacent rock formations and which can be remotely sensed establish the following most useful geological characteristics: Topographic landform, color, albedo, and surface temperature.

  15. Autostereoscopic projection viewer

    DOEpatents

    Toeppen, John S.

    2006-12-19

    An autostereoscopic viewer is employed to produce aberration corrected images to simulate a virtual presence by employing pairs of projector optical components coupled with an image corrector plate and a field lens. Images are designed with magnifications and optical qualities and positioned at predetermined eyezones having controlled directional properties. The viewer's eyes are positioned in these eyezones. The size of these zones is related to the aperture of the projection lenses, the magnification produced by the Fresnel(s), and the optical properties and position of the image corrector plate.

  16. Educational Projects at ESO

    NASA Astrophysics Data System (ADS)

    Boffin, H. M. J.

    2005-11-01

    ESO's public outreach activities comprise communication and media activities, educational projects and targeted events, addressing well-defined audiences. In 2004, one major activity stands out both in terms of visibility and in covering all of the above areas: the Venus Transit 2004 Public Science Discovery Programme. This very successful programme comprised the development of an extensive set of teaching materials for schools, a web-based information and reporting system, observational activities on the day of the transit as well as a video contest and a final event in Paris in November.

  17. Flight projects overview

    NASA Technical Reports Server (NTRS)

    Levine, Jack

    1988-01-01

    Information is given in viewgraph form on the activities of the Flight Projects Division of NASA's Office of Aeronautics and Space Technology. Information is given on space research and technology strategy, current space flight experiments, the Long Duration Exposure Facility, the Orbiter Experiment Program, the Lidar In-Space Technology Experiment, the Ion Auxiliary Propulsion System, the Arcjet Flight Experiment, the Telerobotic Intelligent Interface Flight Experiment, the Cryogenic Fluid Management Flight Experiment, the Industry/University In-Space Flight Experiments, and the Aeroassist Flight Experiment.

  18. Probe Project Status and Accomplishments

    SciTech Connect

    Burris, RD

    2001-05-07

    The Probe project has completed its first full year of operation. In this document we will describe the status of the project as of December 31, 2000. We will describe the equipment configuration, then give brief descriptions of the various projects undertaken to date. We will mention first those projects performed for outside entities and then those performed for the benefit of one of the Probe sites. We will then describe projects that are under consideration, including some for which initial actions have been taken and others which are somewhat longer-term.

  19. Adapting Project Management Practices to Research-Based Projects

    NASA Technical Reports Server (NTRS)

    Bahr, P.; Baker, T.; Corbin, B.; Keith, L.; Loerch, L.; Mullenax, C.; Myers, R.; Rhodes, B.; Skytland, N.

    2007-01-01

    From dealing with the inherent uncertainties in outcomes of scientific research to the lack of applicability of current NASA Procedural Requirements guidance documentation, research-based projects present challenges that require unique application of classical project management techniques. If additionally challenged by the creation of a new program transitioning from basic to applied research in a technical environment often unfamiliar with the cost and schedule constraints addressed by project management practices, such projects can find themselves struggling throughout their life cycles. Finally, supplying deliverables to a prime vehicle customer, also in the formative stage, adds further complexity to the development and management of research-based projects. The Biomedical Research and Countermeasures Projects Branch at NASA Johnson Space Center encompasses several diverse applied research-based or research-enabling projects within the newly-formed Human Research Program. This presentation will provide a brief overview of the organizational structure and environment in which these projects operate and how the projects coordinate to address and manage technical requirements. We will identify several of the challenges (cost, technical, schedule, and personnel) encountered by projects across the Branch, present case reports of actions taken and techniques implemented to deal with these challenges, and then close the session with an open forum discussion of remaining challenges and potential mitigations.

  20. Waste Management Project Contingency Analysis

    SciTech Connect

    Edward L. Parsons, Jr.

    1999-08-31

    The purpose of this report is to provide the office of Waste Management (WM) with recommended contingency calculation procedures for typical WM projects. Typical projects were defined as conventional construction-type activities that use innovative elements when necessary to meet the project objectives. Projects involve treatment, storage, and disposal of low level, mixed low level, hazardous, transuranic, and high level waste. Cost contingencies are an essential part of Total Cost Management. A contingency is an amount added to a cost estimate to compensate for unexpected expenses resulting from incomplete design, unforeseen and unpredictable conditions, or uncertainties in the project scope (DOE 1994, AACE 1998). Contingency allowances are expressed as percentages of estimated cost and improve cost estimates by accounting for uncertainties. The contingency allowance is large at the beginning of a project because there are more uncertainties, but as a project develops, the allowance shrinks to adjust for costs already incurred. Ideally, the total estimated cost remains the same throughout a project. Project contingency reflects the degree of uncertainty caused by lack of project definition, and process contingency reflects the degree of uncertainty caused by use of new technology. Different cost estimation methods were reviewed and compared with respect to terminology, accuracy, and Cost Guide standards. The Association for the Advancement of Cost Engineering (AACE) methods for cost estimation were selected to represent best industry practice. AACE methodology for contingency analysis can be readily applied to WM Projects, accounts for uncertainties associated with different stages of a project, and considers both project and process contingencies and the stage of technical readiness. As recommended, AACE contingency allowances taper off linearly as a project nears completion.

  1. On superconformal projective hypermultiplets

    NASA Astrophysics Data System (ADS)

    Kuzenko, Sergei M.

    2007-12-01

    Building on the five-dimensional constructions in hep-th/0601177, we provide a unified description of four-dimensional Script N = 2 superconformal off-shell multiplets in projective superspace, including a realization in terms of Script N = 1 superfields. In particular, superconformal polar multiplets are consistently defined for the first time. We present new 4D Script N = 2 superconformal sigma-models described by polar multiplets. Such sigma-models realize general superconformal couplings in projective superspace, but involve an infinite tale of auxiliary Script N = 1 superfields. The auxiliaries should be eliminated by solving infinitely many algebraic nonlinear equations, and this is a nontrivial technical problem. We argue that the latter can be avoided by making use of supersymmetry considerations. All information about the resulting superconformal model (and hence the associated hyperkähler cone) is encoded in the so-called canonical coordinate system for a Kähler metric, which was introduced by Bochner and Calabi in the late 1940s.

  2. Projection optics box

    DOEpatents

    Hale, Layton C.; Malsbury, Terry; Hudyma, Russell M.; Parker, John M.

    2000-01-01

    A projection optics box or assembly for use in an optical assembly, such as in an extreme ultraviolet lithography (EUVL) system using 10-14 nm soft x-ray photons. The projection optics box utilizes a plurality of highly reflective optics or mirrors, each mounted on a precision actuator, and which reflects an optical image, such as from a mask, in the EUVL system onto a point of use, such as a target or silicon wafer, the mask, for example, receiving an optical signal from a source assembly, such as a developed from laser system, via a series of highly reflective mirrors of the EUVL system. The plurality of highly reflective optics or mirrors are mounted in a housing assembly comprised of a series of bulkheads having wall members secured together to form a unit construction of maximum rigidity. Due to the precision actuators, the mirrors must be positioned precisely and remotely in tip, tilt, and piston (three degrees of freedom), while also providing exact constraint.

  3. Cyclic generalized projection MRI.

    PubMed

    Sarty, Gordon E

    2015-04-01

    Progress in the development of portable MRI hinges on the ability to use lightweight magnets that have non-uniform magnetic fields. An image encoding method and mathematical procedure for recovering the image from the NMR signal from non-uniform magnets with closed isomagnetic contours is given. Individual frequencies in an NMR signal from an object in a non-uniform magnetic field give rise to integrals of the object along contours of constant magnetic field: generalized projections. With closed isomagnetic field contours a simple, cyclic, direct reconstruction of the image from the generalized projections is possible when the magnet and RF transmit coil are held fixed relative to the imaged object while the RF receive coil moves. Numerical simulations, using the Shepp and Logan mathematical phantom, were completed to show that the mathematical method works and to illustrate numerical limitations. The method is numerically verified and exact reconstruction demonstrated for discrete mathematical image phantoms. Correct knowledge of the RF receive field is necessary or severe image distortions will result. The cyclic mathematical reconstruction method presented here will be useful for portable MRI schemes that use non-uniform magnets with closed isomagnetic contours along with mechanically or electronically moving the RF receive coils.

  4. The AGROBOT project.

    PubMed

    Buemi, F; Massa, M; Sandini, G; Costi, G

    1996-01-01

    The aim of this paper is to illustrate the AGROBOT project. This project was initiated to develop a complete robotic system for the production cycle of tomato plants in a greenhouse environment. The robot architecture is based on a vehicle carrying the picking arm (a six degrees of freedom anthropomorphic arm with a gripper/hand), the head with the two micro cameras (for the color stereoscopic vision system) and the VME rack for the complete control of the system. The head was purposely developed to permit complete visibility of the overall area. The vision system drives the head to point the path during navigation or to explore the plants looking for the work objects. The robot will be able to navigate between rows of plants, stop near each plant and identify the relevant objects (fruits or flowers) so as to be able to pick ripe tomatoes or spray anticryptogamic substances on flowers. Due to its flexible architecture, the system can be suited to operate on other kinds of cultivation or could be modified to perform other kinds of operations such as transplanting or packaging. Also the field of action could be different from greenhouses: changing from a wheeled locomotion system to a tracked system, the robot will be able to operate on particularly irregular surfaces. These features make this robotic system particularly adapted to replace human from tiring and harmful tasks or operating within adverse environment.

  5. THE BIOCATALYTIC DESULFURIZATION PROJECT

    SciTech Connect

    Steven E. Bonde; David Nunn

    2003-01-01

    During the first quarter of the Biological Desulfurization project several activities were pursued. A project kickoff meeting was held at the Diversa facility in San Diego, CA. Activities that were in process before the meeting and begun afterwards by Diversa Corporation and Petro Star Inc. include: Technology transfer in the form of information generated by Enchira to Diversa, the purchase and installation of equipment by Diversa, development of synthetic methods and preparation of organo-sulfur substrates for use in determining enzyme activities, production of extract via Petro Star's CED process, detailed analysis of Petro Star Inc. diesel and CED extract, and several activities in molecular biology. Diversa Corporation, in the area of molecular biology, engaged in several activities in support of the task list of the contract. These included: construction of a genomic library; development and utilization of a sequence-based gene discovery effort; a parallel discovery approach based on functional expression of enzymes with the ability to oxidize organosulfur compounds. Biodesulfurization genes have already been identified and are being sequenced and subcloned for expression in heterologous biological hosts. Diversa has evaluated and adapted assays developed by Enchira used to assess the activities of DBT and DBTO{sub 2} monooxygenases. Finally, Diversa personnel have developed two novel selection/screen strategies for the improvement of biocatalyst strains by directed evolution.

  6. ORISON, a stratospheric project

    NASA Astrophysics Data System (ADS)

    Ortiz Moreno, Jose Luis; Mueller, Thomas; Duffard, Rene; Juan Lopez-Moreno, Jose; Wolf, Jürgen; Schindler, Karsten; Graf, Friederike

    2016-07-01

    Astronomical research based on satellites is extremely expensive, complex, requires years of development, and the overall difficulties are immense. The ORISON project addresses the feasibility study and the design of a global solution based on platforms on-board stratospheric balloons, which allows overcoming the limitations of the Earth's atmosphere, but at a much lower cost and with fewer complications than on satellite platforms. The overall idea is the use of small low-cost stratospheric balloons, either individually or as a fleet, equipped with light-weight medium-sized telescopes and other instruments to perform specific tasks on short-duration missions. They could carry different payloads for specific "experiments" too, and should be configurable to some degree to accommodate variable instrumentation. These balloon-based telescopes should be designed to be launched from many sites on Earth, not necessarily from remote sites such as Antarctica or near the North Pole, and at low cost. This project has received funding from the European Union's Horizon 2020 research and innovation programme under grant agreement No 690013.

  7. The ARCHES Project

    NASA Astrophysics Data System (ADS)

    Motch, C.; Arches Consortium

    2015-09-01

    The Astronomical Resource Cross-matching for High Energy Studies (ARCHES) project is a FP7-Space funded programme started in 2013 and involving the Observatoire Astronomique de Strasbourg including the CDS (France), the Leibniz- Institut für Astrophysik Potsdam (Germany), the University of Leicester (UK), the Universidad de Cantabria (IFCA, Spain) and the Instituto Nacional de Tecnica Aeroespacial (Spain). ARCHES will provide the international astronomical community with well-characterised multi-wavelength data in the form of spectral energy distributions (SEDs) for large samples of objects extracted from the 3XMM X-ray catalogue of serendipitous sources. The project develops new tools implementing fully probabilistic simultaneous cross-correlation of several catalogues and a multi-wavelength finder for clusters of galaxies. SEDs are based on an enhanced version of the 3XMM catalogue and on a careful selection of the most relevant multi-wavelength archival catalogues. In order to ensure the largest audience, SEDs will be distributed to the international community through CDS services and through the Virtual Observatory. These enhanced resources are tested in the framework of several science cases. More information may be found at http://www.arches-fp7.eu/

  8. The ARCHES project

    NASA Astrophysics Data System (ADS)

    Motch, C.; Arches Consortium

    2014-07-01

    ARCHES (Astronomical Resource Cross-matching for High Energy Studies) is a FP7-Space funded project started in 2013 and involving the Observatoire Astronomique de Strasbourg including the CDS (France), the Leibniz-Institut fuer Astrophysik Potsdam (Germany), the University of Leicester (UK), the Universidad de Cantabria (IFCA, Spain) and the Instituto Nacional de Técnica Aeroespacial (Madrid, Spain). ARCHES aims at providing the international astronomical community with well-characterised multi-wavelength data in the form of spectral energy distributions (SEDs) for large sets of objects extracted from the 3XMM catalogue. The project develops new tools implementing fully probabilistic simultaneous cross-correlation of several catalogues. SEDs are based on an enhanced version of the 3XMM catalogue and on a careful selection of the most relevant multi-wavelength archival catalogues. In order to ensure the largest audience, SEDs will be distributed to the international community through CDS services and through the Virtual Observatory. These enhanced resources are currently tested in the framework of several science cases. An integrated cluster finder is developed at Potsdam, AGN science is studied at Leicester and IFCA while populations of Galactic X-ray sources are investigated at Strasbourg and Madrid.

  9. Challenges of Physiome Projects

    NASA Astrophysics Data System (ADS)

    Nomura, Taishin

    The integration of knowledge from many disciplines and vast amount of biological data in the post-genome era together with mathematical and information sciences is moving the world towards a new generation of life science where physiological and pathological information from the living human body can be quantitatively described in silico across multiple scales of time and size and through diverse hierarchies of organization. The Physiome Project represents such emerging sciences. The challenge is to understand and quantitatively integrate not only structure and function of biological entities such as ion channel proteins and enzymes on a single spatio-temporal scale, but also functional relationships between entities across multiple scales. This integrative approach is in stark contrast to the linear approach of reductionist life science, and it will allow us to understand the mechanisms underlying biological functions that will emerge through the dynamics of each element and large aggregations of the elements. This article discusses several points of the challenge that are expected to be resolved through the Physiome Project.

  10. The AGROBOT project

    NASA Astrophysics Data System (ADS)

    Buemi, F.; Massa, M.; Sandini, G.; Costi, G.

    The aim of this paper is to illustrate the AGROBOT project. This project was initiated to develop a complete robotic system for the production cycle of tomato plants in a greenhouse environment. The robot architecture is based on a vehicle carrying the picking arm (a six degrees of freedom anthropomorphic arm with a gripper/hand), the head with the two micro cameras (for the color stereoscopic vision system) and the VME rack for the complete control of the system. The head was purposely developed to permit complete visibility of the overall area. The vision system drives the head to point the path during navigation or to explore the plants looking for the work objects. The robot will be able to navigate between rows of plants, stop near each plant and identify the relevant objects (fruits or flowers) so as to be able to pick ripe tomatoes or spray anticryptogamic substances on flowers. Due to its flexible architecture, the system can be suited to operate on other kinds of cultivation or could be modified to perform other kinds of operations such as transplanting or packaging. Also the field of action could be different from greenhouses: changing from a wheeled locomotion system to a tracked system, the robot will be able to operate on particularly irregular surfaces. These features make this robotic system particularly adapted to replace human from tiring and harmful tasks or operating within adverse environment.

  11. The CASH Project

    NASA Astrophysics Data System (ADS)

    Seyler, F.; Bonnet, M.-P.; Calmant, S.; Cauhopé, M.; Cazenave, A.; Cochonneau, G.; Divol, J.; Do-Minh, K.; Frappart, F.; Gennero, M.-C.; Guyenne-Blin, K.; Huynh, F.; Leon, J. G.; Mangeas, M.; Mercier, F.; Rocquelain, GH.; Tocqueville, L.; Zanifé, O.-Z.

    2006-07-01

    CASH « Contribution of spatial altimetry to hydrology » aims at the definition of a global, standard, fast and long term access to a set of hydrological data concerning the greatest river basins in the world. The key questions to be answered are: what are the conditions for monitoring river water stages from altimetric radar data and how is it possible to combine altimetric data with other spatial sources or/and in-situ data in order to deliver useful parameters for hydrology community, both scientific and end users. The CASH project is ending mid-May of 2006 and there is yet a lot of tasks to be performed for altimetric heigths of continental water bodies becoming part of the scientific and end-users hydrologists day-to- day practice. The project has nethertheless delineated the way this use could be improved in a near future, and opened very interesting perspectives for ungauged or poorly gauged great basins in the world.

  12. Lemnos interoperable security project.

    SciTech Connect

    Halbgewachs, Ronald D.

    2010-03-01

    With the Lemnos framework, interoperability of control security equipment is straightforward. To obtain interoperability between proprietary security appliance units, one or both vendors must now write cumbersome 'translation code.' If one party changes something, the translation code 'breaks.' The Lemnos project is developing and testing a framework that uses widely available security functions and protocols like IPsec - to form a secure communications channel - and Syslog, to exchange security log messages. Using this model, security appliances from two or more different vendors can clearly and securely exchange information, helping to better protect the total system. Simplify regulatory compliance in a complicated security environment by leveraging the Lemnos framework. As an electric utility, are you struggling to implement the NERC CIP standards and other regulations? Are you weighing the misery of multiple management interfaces against committing to a ubiquitous single-vendor solution? When vendors build their security appliances to interoperate using the Lemnos framework, it becomes practical to match best-of-breed offerings from an assortment of vendors to your specific control systems needs. The Lemnos project is developing and testing a framework that uses widely available open-source security functions and protocols like IPsec and Syslog to create a secure communications channel between appliances in order to exchange security data.

  13. The Yohkoh Galileo Project

    NASA Astrophysics Data System (ADS)

    Davey, A. R.; Acton, L. W.

    2002-05-01

    The Japan/US/UK Yohkoh mission was launched on 29 August 1991 and ceased acquiring solar observations on 14 December 2001. Over the decade the mission returned a record of energetic solar coronal and activity phenomena of high quality and enduring value. In order to assure the usability of Yohkoh data for generations of future scientists we plan to create a durable and readily accessible archive of Yohkoh data products and descriptive and explanatory documentation. We call the effort to preserve and document the Yohkoh data archive the YOHKOH GALILEO PROJECT in honor of Galileo Galilei, whose 17th-century sunspot observations are still scientifically useful today. The ten years of observations by Yohkoh provide a unique, high-quality, record of the evolution high-energy solar phenomena over an entire sunspot cycle. These data will be mined for decades, if not centuries, for studies of solar activity, its control of space weather and the sun-earth connection, and properties of magnetically active astrophysical objects. The Galileo Project is being undertaken by the same team of U.S., Japanese, and U.K. scientists who cooperatively conducted the observational phase of the mission and the GSFC Solar Data Analysis Center where the primary public archive of Yohkoh data are located.

  14. EVOLUTIONARY COMPUTING PROJECT

    SciTech Connect

    C. BARRETT; C. REIDYS

    2000-09-01

    This report summarizes LDRD-funded mathematical research related to computer simulation, inspired in part by combinatorial analysis of sequence to structure relationships of bio-molecules. Computer simulations calculate the interactions among many individual, local entities, thereby generating global dynamics. The objective of this project was to establish a mathematical basis for a comprehensive theory of computer simulations. This mathematical theory is intended to rigorously underwrite very large complex simulations, including simulation of bio- and socio-technical systems. We believe excellent progress has been made. Abstraction of three main ingredients of simulation forms the mathematical setting, called Sequential Dynamical Systems (SDS): (1) functions realized as data-local procedures represent entity state transformations, (2) a graph that expresses locality of the functions and which represents the dependencies among entities, and (3) an ordering, or schedule according to which the entities are evaluated, e.g., up-dated. The research spans algebraic foundations, formal dynamical systems, computer simulation, and theoretical computer science. The theoretical approach is also deeply related to theoretical issues in parallel compilation. Numerous publications were produced, follow-on projects have been identified and are being developed programmatically, and a new area in computational algebra, SDS, was produced.

  15. SMC Message Browser Projects

    NASA Technical Reports Server (NTRS)

    Wichmann, Benjamin C.

    2013-01-01

    I work directly with the System Monitoring and Control (SMC) software engineers who develop, test and release custom and commercial software in support of the Kennedy Space Center Spaceport Command and Control System. (SCCS). SMC uses Commercial Off-The-Shelf (COTS) Enterprise Management Systems (EMS) software which provides a centralized subsystem for configuring, monitoring, and controlling SCCS hardware and software used in the Control Rooms. There are multiple projects being worked on using the COTS EMS software. I am currently working with the HP Operations Manager for UNIX (OMU) software which allows Master Console Operators (MCO) to access, view and interpret messages regarding the status of the SCCS hardware and software. The OMU message browser gets cluttered with messages which can make it difficult for the MCO to manage. My main project involves determining ways to reduce the number of messages being displayed in the OMU message browser. I plan to accomplish this task in two different ways: (1) by correlating multiple messages into one single message being displayed and (2) to create policies that will determine the significance of each message and whether or not it needs to be displayed to the MCO. The core idea is to lessen the number of messages being sent to the OMU message browser so the MCO can more effectively use it.

  16. The Yangtze-Project

    NASA Astrophysics Data System (ADS)

    Subklew, Günter; Ulrich, Julia; Fürst, Leander; Höltkemeier, Agnes

    2010-05-01

    As an important element in Chinese politics for the development of the Western parts of the country, a large hydraulic engineering project - the Three Gorges Dam - has been set up in order to dam the Yangtze River for a length of over 600 km with an average width of about 1,100 m. It is expected that this results in ecological, technical and social problems of a magnitude hardly dealt with before. With this gigantic project, the national executive is pursuing the aims of - preventing flooding - safeguarding the water supply - encouraging navigation and - generating electric energy. In future, fluctuations of the water level of up to 30 metres will be deliberately applied in the dammed-up section of the river while retaining the flow character of the seasonal variation. The pollution of the Yangtze with a wide range of problem substances is frequently underestimated since in many cases attention is only paid to the low measured concentrations. However, the large volumes of water lead to appreciable loads and thus the danger of an accumulation of pollutants even reaching the human food chain. It should also not be forgotten that the Yangtze represents the major, and in some cases indeed the only, source of drinking and domestic water for the population. A consideration of the water level in the impoundment that will in future arise from management of the reservoir reveals the dramatic change in contrast to the natural inundation regime. In the past, the flood events on the banks of the Yangtze and its tributaries occurred in the summer months. The plants in the riparian zone (water fluctuation zone = WFZ) were previously inundated during the warmer time of year (28 ° July/August) and the terrestrial phase of the WFZ was characterized by cool temperatures (3-5 °C January) that permitted little plant activity. In future, the highest water levels will occur in winter above the dam on the Yangtze and also on the tributaries flowing into it. The plants in the WFZ will

  17. Device Oriented Project Controller

    SciTech Connect

    Dalesio, Leo; Kraimer, Martin

    2013-11-20

    This proposal is directed at the issue of developing control systems for very large HEP projects. A de-facto standard in accelerator control is the Experimental Physics and Industrial Control System (EPICS), which has been applied successfully to many physics projects. EPICS is a channel based system that requires that each channel of each device be configured and controlled. In Phase I, the feasibility of a device oriented extension to the distributed channel database was demonstrated by prototyping a device aware version of an EPICS I/O controller that functions with the current version of the channel access communication protocol. Extensions have been made to the grammar to define the database. Only a multi-stage position controller with limit switches was developed in the demonstration, but the grammar should support a full range of functional record types. In phase II, a full set of record types will be developed to support all existing record types, a set of process control functions for closed loop control, and support for experimental beam line control. A tool to configure these records will be developed. A communication protocol will be developed or extensions will be made to Channel Access to support introspection of components of a device. Performance bench marks will be made on both communication protocol and the database. After these records and performance tests are under way, a second of the grammar will be undertaken.

  18. The Human Variome Project.

    PubMed

    Burn, John; Watson, Michael

    2016-06-01

    The practical realization of genomics has meant a growing realization that variant interpretation is a major barrier to practical use of DNA sequence data. The late Professor Dick Cotton devoted his life to innovation in molecular genetics and was a prime mover in the international response to the need to understand the "variome." His leadership resulted in the launch first of the Human Genetic Variation Society and then, in 2006, an international agreement to launch the Human Variome Project (HVP), aimed at data integration enabled by standards and infrastructure of the databases of variants being identified in families with a range of inherited disorders. The project attracted a network of affiliates across 81 countries and earned formal recognition by UNESCO, which now hosts its biennial meetings. It has also signed a Memorandum of Understanding with the World Health Organization. Future progress will depend on longer term secure funding and integration with the efforts of the genomics community where the rapid advances in sequencing technology have enabled variant capture on a previously unimaginable scale. Efforts are underway to integrate the efforts of HVP with those of the Global Alliance for Genomics and Health to provide a lasting legacy of Dick Cotton's vision.

  19. DOE Energy Challenge Project

    SciTech Connect

    Frank Murray; Michael Schaepe

    2009-04-24

    Project Objectives: 1. Promote energy efficiency concepts in undergraduate and graduate education. 2. Stimulate and interest in pulp and paper industrial processes, which promote and encourage activities in the area of manufacturing design efficiency. 3. Attract both industrial and media attention. Background and executive Summary: In 1997, the Institute of Paper Science and Technology in conjunction with the U.S. Department of Energy developed a university design competition with an orientation to the Forest Products Industry. This university design competition is in direct alignment with DOE’s interests in instilling in undergraduate education the concepts of developing energy efficient processes, minimizing waste, and providing environmental benefits and in maintaining and enhancing the economic competitiveness of the U.S. forest products industry in a global environment. The primary focus of the competition is projects, which are aligned with the existing DOE Agenda 2020 program for the industry and the lines of research being established with the colleges comprising the Pulp and Paper Education and Research Alliance (PPERA). The six design competitions were held annually for the period 1999 through 2004.

  20. Building Excellence in Project Execution: Integrated Project Management

    DTIC Science & Technology

    2015-04-30

    ååì~ä=^Åèìáëáíáçå= oÉëÉ~êÅÜ=póãéçëáìã= tÉÇåÉëÇ~ó=pÉëëáçåë= sçäìãÉ=f= = Building Excellence in Project Execution: Integrated Project Management Jamie...00-00-2015 to 00-00-2015 4. TITLE AND SUBTITLE Building Excellence in Project Execution: Integrated Project Management 5a. CONTRACT NUMBER...challenge by adopting and refining the CMMI Model and building the tenets of integrated project management (IPM) into project planning and execution

  1. ART/Ada design project, phase 1: Project plan

    NASA Technical Reports Server (NTRS)

    Allen, Bradley P.

    1988-01-01

    The plan and schedule for Phase 1 of the Ada based ESBT Design Research Project is described. The main platform for the project is a DEC Ada compiler on VAX mini-computers and VAXstations running the Virtual Memory System (VMS) operating system. The Ada effort and lines of code are given in tabular form. A chart is given of the entire project life cycle.

  2. Developing Government Renewable Energy Projects

    SciTech Connect

    Kurt S. Myers; Thomas L. Baldwin; Jason W. Bush; Jake P. Gentle

    2012-07-01

    The US Army Corps of Engineers has retained Idaho National Laboratory (INL) to conduct a study of past INL experiences and complete a report that identifies the processes that are needed for the development of renewable energy projects on government properties. The INL has always maintained expertise in power systems and applied engineering and INL’s renewable energy experiences date back to the 1980’s when our engineers began performing US Air Force wind energy feasibility studies and development projects. Over the last 20+ years of working with Department of Defense and other government agencies to study, design, and build government renewable projects, INL has experienced the do’s and don’ts for being successful with a project. These compiled guidelines for government renewable energy projects could include wind, hydro, geothermal, solar, biomass, or a variety of hybrid systems; however, for the purpose of narrowing the focus of this report, wind projects are the main topic discussed throughout this report. It is our thought that a lot of what is discussed could be applied, possibly with some modifications, to other areas of renewable energy. It is also important to note that individual projects (regardless the type) vary to some degree depending on location, size, and need but in general these concepts and directions can be carried over to the majority of government renewable energy projects. This report focuses on the initial development that needs to occur for any project to be a successful government renewable energy project.

  3. The Pacific RANET Project

    NASA Astrophysics Data System (ADS)

    Postawko, S.; Ah Poe, A.; Morrissey, M.

    2004-12-01

    There are few places in the world more vulnerable to the effects of climate variability and change than the island nations of the tropical Pacific Ocean. The region also faces great challenges in communicating the issues related to climate to the general population. Lack of communications infrastructure, multiple languages, and knowledgeable personnel to deliver information, are all challenges for these countries. However, a recently developed international consortium is taking the first steps to addressing these challenges. The RANET (RAdio and interNET communications) project was originally developed for the countries of Africa, with initial funding from NOAA, to make weather, climate, and other environmental information more accessible to remote and resource-poor communities. The program is now expanding into Asia and the Pacific. RANET works to build telecommunication bridges between scientific-based products and remote communities that could benefit from such information.?The RANET project in the Pacific is a consortium of partners from the Pacific Island nations, the U.S., New Zealand, Australia, and others. Coordination of the project is loosely overseen by a Steering Committee, made up of representatives from the various interested partners. For regions where the appropriate technology exists (which includes the capital cities of nearly all of the island states of the Pacific), information is downloaded via a digital satellite receiver. This can then be broadcast within a country by many means, including Community FM Radio stations. The information distributed includes technical information needed by meteorological and related services to improve their own products and services, as well as a second level of information designed to serve communities, including weather forecasts, bulletins, warnings, etc. The primary challenge at this time is developing content that is both relevant and understandable to these remote communities. While some information will

  4. The STEAM Project

    NASA Astrophysics Data System (ADS)

    von Schéele, F.; Steam Team

    The proposed satellite project "Stratosphere-Troposphere Exchange And climate Monitor" (STEAM) is dedicated to the investigation of chemical, dynamical, and radiative processes in the upper troposphere and lower stratosphere (UT/LS) altitude range and their links with the Earth climate and stratosphere evolution. The main objectives are to provide vertically and horizontally resolved information on the global distributions of UT/LS key species such as H2O, O3, and CO, and global fields of O3, H2O and halogen compounds responsible for the O3 destruction like ClO in the stratosphere. The UT/LS region plays an important role in the Earth's climate system. Despite its importance there is still a lack of accurate, height-resolved data from the UT/LS. Confronting 3-D climate and chemical-transport models with STEAM observations will improve our knowledge of this atmospheric region. Furthermore, it will be important to continue monitoring the evolution of the stratosphere regarding the expected decline of halogen compounds and recovery of the ozone layer. STEAM consists of a microwave limb-sounding instrument, operating in the 320-360 GHz range to sound the UT/LS and in the 485-505 GHz range to sound the stratosphere, and an optical instrument. By sounding the Earth atmosphere's limb from 5 to 28 km employing a new technique with 8 simultaneous measurements, STEAM will produce a global dataset of UT/LS key species with high vertical (1.5-2.5 km) and horizontal (30-50 km) resolution. The sub-mm band will cover 15 to 40 km. An optical instrument, co-aligned with the mm-wave band, will support micro-wave measurements with cloud indications and in addition provide stratospheric ozone, and aerosol and cloud property measurements. STEAM, planned for a launch in 2008, will be a collaboration between laboratories, industry and agencies in several countries. The Odin heritage of the project (e.g. microwave and optical instruments) provides technical maturity and will help to keep

  5. The safe home project.

    PubMed

    Arphorn, Sara; Jiraniratisai, Sopaphan; Rungtakul, Rungsri; Phutta, Nikom

    2011-12-01

    The Thai Health Promotion Foundation supported the Improvement of Quality of Life of Informal Workers project in Ban Luang District, Amphur Photaram, Ratchaburi Province. There were many informal workers in Ban Luang District. Sweet-crispy fish producers in Ban Luang were the largest group among the sweet-crispy fish producers in Thailand. This project was aimed at improving living and working conditions of informal workers, with a focus on the sweet-crispy fish group. Good practices of improved living and working conditions were used to help informal workers build safe, healthy and productive work environments. These informal workers often worked in substandard conditions and were exposed to various hazards in the working area. These hazards included risk of exposure to hot work environment, ergonomics-related injuries, chemical hazards, electrical hazards etc. Ergonomics problems were commonly in the sweet-crispy fish group. Unnatural postures such as prolonged sitting were performed dominantly. One hundred and fifty informal workers participated in this project. Occupational health volunteers were selected to encourage occupational health and safety in four groups of informal workers in 2009. The occupational health volunteers trained in 2008 were farmers, beauty salon workers and doll makers. The occupational health and safety knowledge is extended to a new informal worker group: sweet-crispy fish producer, in 2009. The occupational health and safety training for sweet-crispy fish group is conducted by occupational health volunteers. The occupational health volunteers increased their skills and knowledge assist in to make safe home and safe community through participatory oriented training. The improvement of living and working condition is conducted by using a modified WISH, Work Improvement for Safe Home, checklist. The plans of improvement were recorded. The informal workers showed improvement mostly on material handling and storage. The safe uses and safe

  6. Equatorial MU Radar project

    NASA Astrophysics Data System (ADS)

    Yamamoto, Mamoru; Hashiguchi, H.; Tsuda, Toshitaka; Yamamoto, Masayuki

    Research Institute for Sustainable Humanosphere, Kyoto University (RISH) has been studying the atmosphere by using radars. The first big facility was the MU (Middle and Upper atmosphere) radar installed in Shiga, Japan in 1984. This is one of the most powerful and multi-functional radar, and is successful of revealing importance of atmospheric waves for the dynamical vertical coupling processes. The next big radar was the Equatorial Atmosphere Radar (EAR) installed at Kototabang, West Sumatra, Indonesia in 2001. The EAR was operated under close collaboration with LAPAN (Indonesia National Institute for Aeronautics and Space), and conducted the long-term continuous observations of the equatorial atmosphere/ionosphere for more than 10 years. The MU radar and the EAR are both utilized for inter-university and international collaborative research program for long time. National Institute for Polar Research (NIPR) joined EISCAT Scientific Association together with Nagoya University, and developed the PANSY radar at Syowa base in Antarctica as a joint project with University of Tokyo. These are the efforts of radar study of the atmosphere/ionosphere in the polar region. Now we can find that Japan holds a global network of big atmospheric/ionospheric radars. The EAR has the limitation of lower sensitivity compared with the other big radars shown above. RISH now proposes a plan of Equatorial MU Radar (EMU) that is to establish the MU-radar class radar next to the EAR. The EMU will have an active phased array antenna with the 163m diameter and 1055 cross-element Yagis. Total output power of the EMU will be more than 500kW. The EMU can detect turbulent echoes from the mesosphere (60-80km). In the ionosphere incoherent-scatter observations of plasma density, drift, and temperature would be possible. Multi-channel receivers will realize radar-imaging observations. The EMU is one of the key facilities in the project "Study of coupling processes in the solar-terrestrial system

  7. DBMS as a Tool for Project Management

    NASA Technical Reports Server (NTRS)

    Linder, H.

    1984-01-01

    Scientific objectives of crustal dynamics are listed as well as the contents of the centralized data information system for the crustal dynamics project. The system provides for project observation schedules, gives project configuration control information and project site information.

  8. Project Management Plan for the Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Shipler, D.B.; McMakin, A.H.; Finch, S.M.

    1992-09-01

    This Project Management Plan (PMP) describes the approach being used to manage the Hanford Environmental Dose Reconstruction (HEDR) Project. The plan describes the management structure and the technical and administrative control systems used to plan and control HEDR Project performance. The plan also describes the relationship among key project participants: Battelle, the Centers for Disease control (CDC), and the Technical Steering Panel (TSP). Battelle`s contract with CDC only extends through May 1994 when the key technical work will be completed. There-fore, this plan is focused only on the period during which Battelle is a participant.

  9. Project Management Plan for the Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Shipler, D.B.; McMakin, A.H.; Finch, S.M.

    1992-09-01

    This Project Management Plan (PMP) describes the approach being used to manage the Hanford Environmental Dose Reconstruction (HEDR) Project. The plan describes the management structure and the technical and administrative control systems used to plan and control HEDR Project performance. The plan also describes the relationship among key project participants: Battelle, the Centers for Disease control (CDC), and the Technical Steering Panel (TSP). Battelle's contract with CDC only extends through May 1994 when the key technical work will be completed. There-fore, this plan is focused only on the period during which Battelle is a participant.

  10. NYU Ultracomputer project. Final project summary, 1979-1993

    SciTech Connect

    Gottlieb, A.

    1994-10-01

    This report discusses the following on the Ultracomputer project: simulation studies; network analysis; prototype hardware; VSLI design; coordination algorithms; systems software; application software; and compiler development.

  11. Content addressable memory project

    NASA Technical Reports Server (NTRS)

    Hall, Josh; Levy, Saul; Smith, D.; Wei, S.; Miyake, K.; Murdocca, M.

    1991-01-01

    The progress on the Rutgers CAM (Content Addressable Memory) Project is described. The overall design of the system is completed at the architectural level and described. The machine is composed of two kinds of cells: (1) the CAM cells which include both memory and processor, and support local processing within each cell; and (2) the tree cells, which have smaller instruction set, and provide global processing over the CAM cells. A parameterized design of the basic CAM cell is completed. Progress was made on the final specification of the CPS. The machine architecture was driven by the design of algorithms whose requirements are reflected in the resulted instruction set(s). A few of these algorithms are described.

  12. Winnebago Tribe Solar Project

    SciTech Connect

    Nieman, Autumn

    2016-02-26

    The strategy of the Solar Project was to reduce fuel use within two years by a roof mounted photovoltaic system. The police/fire building is completely powered by electricity. The renewable energy system we have selected has a power capacity of 23kW and the ability to export 44.3 MWh. We anticipate 32.55% kWh energy savings, an excess of the required 30% reduction, in the building’s total fuel use based on the most current 12 months of data (2012). The solar electric system is a grid-tie, ballast mounted on a flat roof over the police/fire station. The solar electric system includes 280 Watt modules for a nominal total of 22.80 kW. Approximately 84 modules are ballast mounted to the flat roof facing south.

  13. Aerocapture Technology Project Overview

    NASA Technical Reports Server (NTRS)

    James, Bonnie; Munk, Michelle; Moon, Steve

    2003-01-01

    Aerocapture technology development is one of the highest priority investments for the NASA In-Space Propulsion Program (ISP). The ISP is managed by the NASA Headquarters Office of Space Science, and implemented by the Marshall Space Flight Center in Huntsville, Alabama. The objective of the ISP Aerocapture Technology Project (ATP) is to develop technologies that can enable and/or benefit NASA science missions by significantly reducing cost, mass, and trip times. To accomplish this objective, the ATP identifies and prioritizes the most promising technologies using systems analysis, technology advancement and peer review, coupled with NASA Headquarters Office of Space Science target requirements. Efforts are focused on developing mid-Technology Readiness Level (TRL) technologies to systems-level spaceflight validation.

  14. CUBES Project Support

    NASA Technical Reports Server (NTRS)

    Jenkins, Kenneth T., Jr.

    2012-01-01

    CUBES stands for Creating Understanding and Broadening Education through Satellites. The goal of the project is to allow high school students to build a small satellite, or CubeSat. Merritt Island High School (MIHS) was selected to partner with NASA, and California Polytechnic State University (Cal-Poly}, to build a CubeSat. The objective of the mission is to collect flight data to better characterize maximum predicted environments inside the CubeSat launcher, Poly-Picosatellite Orbital Deplorer (P-POD), while attached to the launch vehicle. The MIHS CubeSat team will apply to the NASA CubeSat Launch Initiative, which provides opportunities for small satellite development teams to secure launch slots on upcoming expendable launch vehicle missions. The MIHS team is working to achieve a test launch, or proof of concept flight aboard a suborbital launch vehicle in early 2013.

  15. PRISM project optical instrument

    NASA Technical Reports Server (NTRS)

    Taylor, Charles R.

    1994-01-01

    The scientific goal of the Passively-cooled Reconnaissance of the InterStellar Medium (PRISM) project is to map the emission of molecular hydrogen at 17.035 micrometers and 28.221 micrometers. Since the atmosphere is opaque at these infrared wavelengths, an orbiting telescope is being studied. The availability of infrared focal plane arrays enables infrared imaging spectroscopy at the molecular hydrogen wavelengths. The array proposed for PRISM is 128 pixels square, with a pixel size of 75 micrometers. In order to map the sky in a period of six months, and to resolve the nearer molecular clouds, each pixel must cover 0.5 arcminutes. This sets the focal length at 51.6 cm. In order for the pixel size to be half the diameter of the central diffraction peak at 28 micrometers would require a telescope aperture of 24 cm; an aperture of 60 cm has been selected for the PRISM study for greater light gathering power.

  16. The goldstone energy project

    NASA Technical Reports Server (NTRS)

    Bartos, K. P.

    1978-01-01

    The Golstone Energy Project was established in 1974 to investigate ways in which the Goldstone Deep Space Complex in California could be made partly or completely energy-sufficient, especially through the use of solar- and wind-derived energy resources. Ways in which energy could be conserved at the Complex were also studied. Findings included data on both wind and solar energy. Obstacles to demonstrating energy self-sufficiency are: (1) operation and maintenance costs of solar energy systems are estimated to be much higher than conventional energy systems, (2) initial capital costs of present-day technology solar collectors are high and are compounded by low collector efficiency, and (3) no significant market force exists to create the necessary industry to reduce costs through mass production and broad open-market competition.

  17. The Biocatalytic Desulfurization Project

    SciTech Connect

    David Nunn; James Boltz; Philip M. DiGrazia; Larry Nace

    2006-03-03

    The material in this report summarizes the Diversa technical effort in development of a biocatalyst for the biodesulfurization of Petro Star diesel as well as an economic report of standalone and combined desulfurization options, prepared by Pelorus and Anvil, to support and inform the development of a commercially viable process. We will discuss goals of the projected as originally stated and their modification as guided by parallel efforts to evaluate commercialization economics and process parameters. We describe efforts to identify novel genes and hosts for the generation of an optimal biocatalyst, analysis of diesel fuels (untreated, chemically oxidized and hydrotreated) for organosulfur compound composition and directed evolution of enzymes central to the biodesulfurization pathway to optimize properties important for their use in a biocatalyst. Finally we will summarize the challenges and issues that are central to successful development of a viable biodesulfurization process.

  18. The HAND Nanosatellite Project

    NASA Astrophysics Data System (ADS)

    Hempsell, M.; Moses, R.

    The HAND (Human Activated Nanosatellite Demonstration) satellite was developed with the objective of producing a satellite within the time and budgetary constraints associated with Master level undergraduate research projects. HAND was designed as a passively stabilised nanosatellite with a mass of about 6.5 kilograms and over 1.2 m tall when deployed. It was intended to be carried into orbit in a mid-deck locker in the Space Shuttle. It would then be deployed by an astronaut during an EVA simply by pushing it away. It was hoped the spacecraft would prove the engineering and operational aspects of the nanosatellite platform, which could then be the basis of a series of low cost education satellites from universities and even secondary schools.

  19. DOE SAPPHIRE PROJECT

    SciTech Connect

    Dr. Gary R. Pickrell

    2000-03-01

    Since this is the first report for this project an extensive background section follows on the theory of operation of the single crystal sapphire sensor technology which will be developed and field tested at the Wabash River Coal Gasification Facility. Requirements for the temperature sensors for implementation in the coal gasifiers has been established in conjunction with the industrial partner, Dynegy. Coal slag immersion tests indicate good corrosion resistance of the single crystal sapphire. However, a more sophisticated corrosion apparatus has been constructed in order to test the optical attenuation of a single crystal sapphire fiber immersed in the coal slag at high temperature. These results will be reported in the next period. The data to date for sapphire sensor development is promising. More extensive data on the sapphire fiber sensor development will be reported for the next period.

  20. EU Cadzie project

    NASA Astrophysics Data System (ADS)

    Naaim, M.

    2009-04-01

    The CADZIE project received nearly € 700,000 funding under the energy, environment and sustainable development section of the Fifth Framework Programme (FP5). Several scientists from France, Italy, Norway, Austria, Iceland and Switzerland were involved in this initiative, under the co-ordination of the Cemagref institute in Grenoble, France. The initiative was created in response to the extreme avalanche winter of 1999, during which 83 people were killed across Europe. Avalanche protection relies on two key processes: structural measures such as building defence structures to stop and / or contain the avalanche flow and non structural measures such as zoning the exposed areas. The consortium investigated these two areas in order to improve overall protection methods. This EU-funded collaboration has led to the development of more accurate methods for mapping and protection design.