Science.gov

Sample records for 94-1 implementation plan

  1. DNFSB recommendation 94-1 Hanford site integrated stabilization management plan - VOLUMES 1-3

    SciTech Connect

    Gerber, E.W.

    1996-09-23

    The US Department of Energy (DOE) has developed an Integrated Program Plan (IPP) to address concerns identified in Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. The IPP describes the actions that DOE plans to implement at its various sites to convert excess fissile materials to forms or conditions suitable for safe interim storage. The baseline IPP was issued as DOE's DNFSB Recommendation 94-1 Implementation Plan (IP), which was transmitted to the DNFSB on February 28, 1995. The IPP was subsequently supplemented with an Integrated Facilities Plan and a Research and Development Plan, which further develop complex-wide research and development and long-range facility requirements and plans. These additions to the baseline IPP were developed based on a systems engineering approach that integrated facilities and capabilities at the various DOE sites and focused on attaining safe interim storage with minimum safety risks and environmental impacts. Each affected DOE site has developed a Site Integrated Stabilization Management Plan (SISMP) to identify individual site plans to implement the DNFSB Recommendation 94-1 IPP. The SISMPs were developed based on the objectives, requirements, and commitments identified in the DNFSB Recommendation 94-1 IP. The SISMPs supported formulation of the initial versions of the Integrated Facilities Plan and the Research and Development Plan. The SISMPs are periodically updated to reflect improved integration between DOE sites as identified during the IPP systems engineering evaluations. This document constitutes the Hanford SISMP. This document includes the planned work scope, costs and schedules for activities at the Hanford site to implement the DNFSB Recommendation 94-1 IPP.

  2. DNFSB Recommendation 94-1 Hanford Site Integrated Stabilization Management Plan. Volume 1

    SciTech Connect

    Gerber, E.W.

    1995-10-01

    The US Department of Energy (DOE) has developed an Integrated Program Plan (IPP) to address concerns identified in Defense Nuclear Facilities Safety Board Recommendation 94-1. The IPP describes the actions that DOE plans to implement at its various sites to convert excess fissile materials to forms or conditions suitable for safe interim storage. The baseline IPP was issued as DOE`s Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1 Implementation Plan (IP), which was transmitted to the DNFSB on February 28, 1995. The IPP is being further developed to include complex-wide requirements for research and development and a long-range facility requirements section. The planned additions to the baseline IPP are being developed based on a systems engineering approach that integrates facilities and capabilities at the various DOE sites and focuses on attaining safe interim storage with minimum safety risks and environmental impacts. Each affected DOE site has developed a Site Integrated Stabilization Management Plan (SISMP) to identify individual site plans to implement the DNFSB Recommendation 94-1 and to provide a basis for formulating planned additions to the IPP. The SISMPs were developed based on the objectives, requirements, and commitments identified in the baseline DNFSB Recommendation 94-1 IPP. The SISMPs will be periodically updated to reflect improved integration between DOE sites as identified during the IPP systems engineering evaluations.

  3. DNFSB recommendation 94-1 Hanford site integrated stabilization management plan

    SciTech Connect

    McCormack, R.L.

    1997-05-07

    In May 1994, the Defense Nuclear Facilities Safety Board (DNFSB) issued DNFSB Recommendation 94-1 (Conway 1994), which identified concerns related to US Department of Energy (DOE) management of legacy fissile materials remaining from past defense production activities. The DNFSB expressed concern about the existing storage conditions for these materials and the slow pace at which the conditions were being remediated. The DNFSB also expressed its belief that additional delays in stabilizing these fissile materials would be accompanied by further deterioration of safety and unnecessary increased risks to workers and the public. In February 1995, DOE issued the DNFSB Recommendation 94-1 Implementation Plan (O`Leary 1995) to address the concerns identified in DNFSB Recommendation 94-1. The Implementation Plan (IP) identifies several DOE commitments to achieve safe interim storage for the legacy fissile materials, and constitutes DOE`s baseline DNFSB Recommendation 94-1 Integrated Program Plan (IPP). The IPP describes the actions DOE plans to implement within the DOE complex to convert its excess fissile materials to forms or conditions suitable for safe interim storage. The IPP was subsequently supplemented with an Integrated Facilities Plan and a Research and Development Plan, which further develop complex-wide research and development and long-range facility requirements and plans. The additions to the baseline IPP were developed based on a systems engineering approach that integrated facilities and capabilities at the various DOE sites and focused on attaining safe interim storage with minimum safety risks and environmental impacts. Each affected DOE site has developed a Site Integrated Stabilization Management Plan (SISMP) to identify individual site plans to implement the DNFSB Recommendation 94-1 IPP. The SISMPs were developed based on the objectives, requirements, and commitments identified in the DNFSB Recommendation 94-1 IP. The SISMPs also supported

  4. DNFSB Recommendation 94-1 Hanford site integrated stabilization management plan, volumes 1 and 2

    SciTech Connect

    Gerber, E.W.

    1996-03-15

    This document comprises the Hanford Site Integrated Stabilization Management Plan (SISMP). This document describes the DOE`s plans at the Hanford Site to address concerns identified in Defense Nuclear Facilites Safety Board (DNFSB) Recommendation 94-1. This document also identifies plans for other spent nuclear fuel (SNF) inventories at the Hanford Site which are not within the scope of DNFSB Recommendation 94-1 for reference purposes because of their interrelationship with plans for SNF within the scope of DNFSB Recommendation 94-1. The SISMP was also developed to assist DOE in initial formulation of the Research and Development Plan and the Integrated Facilities Plan.

  5. DNFSB Recommendation 94-1 Hanford Site Integrated Stabilization Management Plan. Volume 2

    SciTech Connect

    Gerber, E.W.

    1995-10-01

    The Hanford Site Integrated Stabilization Management Plan (SISMP) was developed in support of the US Department of Energy`s (DOE) Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1 Integrated Program Plan (IPP). Volume 1 of the SISMP identifies the technical scope and costs associated with Hanford Site plans to resolve concerns identified in DNFSB Recommendation 94-1. Volume 2 of the SISMP provides the Resource Loaded Integrated Schedules for Spent Nuclear Fuel Project and Plutonium Finishing Plant activities identified in Volume 1 of the SISMP. Appendix A provides the schedules and progress curves related to spent nuclear fuel management. Appendix B provides the schedules and progress curves related to plutonium-bearing material management. Appendix C provides programmatic logic diagrams that were referenced in Volume 1 of the SISMP.

  6. DNFSB Recommendation 94-1 Hanford Site Integrated Stabilization Management Plan. Volume 2

    SciTech Connect

    McCormack, R.L.

    1995-08-01

    The Hanford Site Integrated Stabilization Management Plan (SISMP) is being developed in support of the US Department of Energy`s (DOE) Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1 Integrated Program Plan (IPP). Volume 1 of the SISMP identifies the technical scope and costs associated with Hanford Site plans to resolve concerns identified in DNFSB Recommendation 94-1. Volume 2 of the SISMP provides the Resource Loaded Integrated Schedules for Spent Nuclear Fuel Project and Plutonium Finishing Plant activities identified in Volume 1 of the SISMP. Appendix A provides the schedules and progress curves related to spent nuclear fuel management. Appendix B provides the schedules and progress curves related to plutoniumbearing material management. Appendix C provides programmatic logic diagrams that were referenced in Volume 1 of the SISMP.

  7. DNFSB Recommendation 94-1 Hanford Site Integrated Stabilization Management Plan. Volume 1

    SciTech Connect

    McCormack, R.L.

    1995-08-01

    This document describes the plans of the Hanford Site for the safe interim storage of fissile materials. Currently, spent nuclear fuels reside in storage basins that have leaked in the past and are projected to leak in the future. Other problems in the basins include; sludge from decomposition, degraded cladding of fuel elements, and construction defects which make the basins seismically unsafe. This management plan describes the time and cost that it will take to implement a safe interim storage plan for the fissile materials.

  8. Implementing a Capital Plan.

    ERIC Educational Resources Information Center

    Daigneau, William A.

    2003-01-01

    Addresses four questions regarding implementation of a long-term capital plan to manage a college's facilities portfolio: When should the projects be implemented? How should the capital improvements be implemented? What will it actually cost in terms of project costs as well as operating costs? Who will implement the plan? (EV)

  9. Implementing College Strategic Plans.

    ERIC Educational Resources Information Center

    Further Education Development Agency, London (England).

    This document, which is intended for individuals responsible for planning and management at further education (FE) colleges, summarizes the factors that contributed to or obstructed implementation of strategic plans in 10 FE colleges in England and Wales in 1994-95. It presents key questions and illustrations that FE colleges can use for…

  10. Strategic implementation plan

    NASA Technical Reports Server (NTRS)

    1989-01-01

    The Life Science Division of the NASA Office of Space Science and Applications (OSSA) describes its plans for assuring the health, safety, and productivity of astronauts in space, and its plans for acquiring further fundamental scientific knowledge concerning space life sciences. This strategic implementation plan details OSSA's goals, objectives, and planned initiatives. The following areas of interest are identified: operational medicine; biomedical research; space biology; exobiology; biospheric research; controlled ecological life support; flight programs and advance technology development; the life sciences educational program; and earth benefits from space life sciences.

  11. Environmental Implementation Plan

    SciTech Connect

    Not Available

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

  12. Environmental Implementation Plan

    SciTech Connect

    Not Available

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.

  13. Environmental Implementation Plan

    SciTech Connect

    Not Available

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

  14. TRUPACT-1 implementation plan

    SciTech Connect

    Hurley, J.D.; Tappen, J.J. . Joint Integration Office); Christensen, D.S. )

    1985-09-01

    TRUPACT-1, the TRansUranic PACkage Transporter is a packaging designed to transport defense contact handled transuranic (CH-TRU) waste from generating and interim TRU waste storage facilities to the Waste Isolation Pilot Plant (WIPP). Prior to fabrication and procurement of a full fleet, an initial design (TRUPACT-1) will be introduced to the defense TRU waste complex through use in an operational prototype fleet which will consist of Units 1, 2, and 3. In an effort to provide a relatively smooth introduction of the TRUPACT-1, the TRUPACT Technical Team (TTT) has developed the following implementation plan. The plan provides detailed information on user handling opportunities, schedules, equipment, responsibilities, reporting and data collection activities to be performed. The intent of this document is to provide users of the TRUPACT-1 with a guidance document, complete with references, that will allow the smooth introduction of this new transportation system by providing the information necessary for collecting operational, performance and cost data. These data will be used in modeling and full fleet design and procurement activities. In addition, these data will help fine tune procedures in the inspection and maintenance document and the operational document. Additional objectives of this plan are to aid in the establishment of site operational, inspection and maintenance procedures as well as training of site operators and briefing state and local officials.

  15. 22 CFR 94.1 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 22 Foreign Relations 1 2012-04-01 2012-04-01 false Definitions. 94.1 Section 94.1 Foreign Relations DEPARTMENT OF STATE LEGAL AND RELATED SERVICES INTERNATIONAL CHILD ABDUCTION § 94.1 Definitions... International Child Abduction, Appendix B to Department of State notice, 51 FR 10498, March 26, 1986....

  16. 22 CFR 94.1 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 22 Foreign Relations 1 2014-04-01 2014-04-01 false Definitions. 94.1 Section 94.1 Foreign Relations DEPARTMENT OF STATE LEGAL AND RELATED SERVICES INTERNATIONAL CHILD ABDUCTION § 94.1 Definitions... International Child Abduction, Appendix B to Department of State notice, 51 FR 10498, March 26, 1986....

  17. 22 CFR 94.1 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 22 Foreign Relations 1 2013-04-01 2013-04-01 false Definitions. 94.1 Section 94.1 Foreign Relations DEPARTMENT OF STATE LEGAL AND RELATED SERVICES INTERNATIONAL CHILD ABDUCTION § 94.1 Definitions... International Child Abduction, Appendix B to Department of State notice, 51 FR 10498, March 26, 1986....

  18. 22 CFR 94.1 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Definitions. 94.1 Section 94.1 Foreign Relations DEPARTMENT OF STATE LEGAL AND RELATED SERVICES INTERNATIONAL CHILD ABDUCTION § 94.1 Definitions... International Child Abduction, Appendix B to Department of State notice, 51 FR 10498, March 26, 1986....

  19. 22 CFR 94.1 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 1 2011-04-01 2011-04-01 false Definitions. 94.1 Section 94.1 Foreign Relations DEPARTMENT OF STATE LEGAL AND RELATED SERVICES INTERNATIONAL CHILD ABDUCTION § 94.1 Definitions... International Child Abduction, Appendix B to Department of State notice, 51 FR 10498, March 26, 1986....

  20. Conduct of operations implementation plan

    SciTech Connect

    Anderson, C.K.; Hall, R.L.

    1991-02-20

    This implementation plan describes the process and provides information and schedules that are necessary to implement and comply with the Department of Energy (DOE) Order 5480.19, {open_quotes}Conduct of Operations{close_quotes} (CoOp). This plan applies to all Pinellas Plant operations and personnel. Generally, this Plan discusses how DOE Order 5480.19 will be implemented at the Pinellas Plant.

  1. Environmental implementation plan

    SciTech Connect

    Peterson, G.L.

    1994-10-04

    In this document, the Savannah River site environmental programs and plans from DOE contractors and Westinghouse Savannah River Company divisions/departments are presented along with the environmental coordinator for each program. The objectives are to enhase communication of existing or planned programs to do the following: identify activities required for meeting environmental needs; identify needing resources and a schedule to accomplish those activities; promote share-savings and consistency in those activities.

  2. 7 CFR 94.1 - General.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., Marketing Practices), DEPARTMENT OF AGRICULTURE (CONTINUED) COMMODITY LABORATORY TESTING PROGRAMS POULTRY AND EGG PRODUCTS Mandatory Analyses of Egg Products § 94.1 General. Microbiological, chemical, and physical analysis of liquid, frozen, and dried egg products is performed under authority of the...

  3. Land Use Control Implementation Plan

    NASA Technical Reports Server (NTRS)

    Starr, Andrew Scott

    2015-01-01

    This Land Use Control Implementation Plan (LUCIP) has been prepared to inform current and potential future users of Building M7-505 of institutional controls that have been implemented at the site. Although there are no current unacceptable risks to human health or the environment associated with Building M7-505, institutional land use controls (LUCs) are necessary to prohibit the use of groundwater from the site. LUCs are also necessary to prevent access to soil under electrical equipment in the northwest portion of the site. Controls necessary to prevent human exposure will include periodic inspection, condition certification, and agency notification.

  4. Planning for Program Implementation -- A Process Guide. Instructional Planning Series.

    ERIC Educational Resources Information Center

    Brokes, A. L.; Jenks, C. L.

    This guide presents tasks a planning group should consider when implementing a program. Although implementation may not occur in this sequence, the total array of implementation tasks includes selecting a planning group leader, defining the problem, selecting objectives, designing the program, developing an implementation plan, developing an…

  5. 10 CFR 820.65 - Implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Implementation plan. 820.65 Section 820.65 Energy... plan. With respect to a DOE Nuclear Safety Requirement for which there is no regulatory provision for an implementation plan or schedule, an exemption may be granted to establish an implementation...

  6. 10 CFR 820.65 - Implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Implementation plan. 820.65 Section 820.65 Energy DEPARTMENT OF ENERGY PROCEDURAL RULES FOR DOE NUCLEAR ACTIVITIES Exemption Relief § 820.65 Implementation plan. With respect to a DOE Nuclear Safety Requirement for which there is no regulatory provision for an implementation plan or schedule, an...

  7. 10 CFR 820.65 - Implementation plan.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Implementation plan. 820.65 Section 820.65 Energy... plan. With respect to a DOE Nuclear Safety Requirement for which there is no regulatory provision for an implementation plan or schedule, an exemption may be granted to establish an implementation...

  8. 10 CFR 820.65 - Implementation plan.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Implementation plan. 820.65 Section 820.65 Energy... plan. With respect to a DOE Nuclear Safety Requirement for which there is no regulatory provision for an implementation plan or schedule, an exemption may be granted to establish an implementation...

  9. Individualized Career Plan (ICP): Implementation Manual.

    ERIC Educational Resources Information Center

    Batsche, Catherine; And Others

    This implementation manual was designed to assist local education agency personnel implement the individualized career plan (ICP) concept in high schools. Questions commonly asked about the ICP are answered. Guidelines are then provided for implementing the four stages of the process: planning, developing, implementing, and evaluating/refining.…

  10. Developing and Implementing a Marketing Plan.

    ERIC Educational Resources Information Center

    McCalmon, Byron G.

    1987-01-01

    A program focusing on recruitment of new freshmen at the University of Colorado at Boulder illustrates some major planning considerations in the development, implementation, and evaluation of a marketing plan. (MSE)

  11. 28 CFR 0.94-1 - Bureau of Justice Assistance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 1 2010-07-01 2010-07-01 false Bureau of Justice Assistance. 0.94-1 Section 0.94-1 Judicial Administration DEPARTMENT OF JUSTICE ORGANIZATION OF THE DEPARTMENT OF JUSTICE 1-Office of Justice Programs and Related Agencies § 0.94-1 Bureau of Justice Assistance. (a) The Bureau...

  12. 28 CFR 0.94-1 - Bureau of Justice Assistance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 1 2014-07-01 2014-07-01 false Bureau of Justice Assistance. 0.94-1 Section 0.94-1 Judicial Administration DEPARTMENT OF JUSTICE ORGANIZATION OF THE DEPARTMENT OF JUSTICE 1-Office of Justice Programs and Related Agencies § 0.94-1 Bureau of Justice Assistance. (a) The Bureau...

  13. 28 CFR 0.94-1 - Bureau of Justice Assistance.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 1 2013-07-01 2013-07-01 false Bureau of Justice Assistance. 0.94-1 Section 0.94-1 Judicial Administration DEPARTMENT OF JUSTICE ORGANIZATION OF THE DEPARTMENT OF JUSTICE 1-Office of Justice Programs and Related Agencies § 0.94-1 Bureau of Justice Assistance. (a) The Bureau...

  14. 28 CFR 0.94-1 - Bureau of Justice Assistance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 28 Judicial Administration 1 2011-07-01 2011-07-01 false Bureau of Justice Assistance. 0.94-1 Section 0.94-1 Judicial Administration DEPARTMENT OF JUSTICE ORGANIZATION OF THE DEPARTMENT OF JUSTICE 1-Office of Justice Programs and Related Agencies § 0.94-1 Bureau of Justice Assistance. (a) The Bureau...

  15. 28 CFR 0.94-1 - Bureau of Justice Assistance.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 1 2012-07-01 2012-07-01 false Bureau of Justice Assistance. 0.94-1 Section 0.94-1 Judicial Administration DEPARTMENT OF JUSTICE ORGANIZATION OF THE DEPARTMENT OF JUSTICE 1-Office of Justice Programs and Related Agencies § 0.94-1 Bureau of Justice Assistance. (a) The Bureau...

  16. Savannah River Site Environmental Implementation Plan

    SciTech Connect

    Not Available

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  17. 50 CFR 600.1008 - Implementation plan and implementation regulations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... program, including: (1) The reduction fishery; (2) The reduction methodology; (3) The maximum reduction... subsidized program on the final development plan. The implementation plan will describe in detail all... methodology; (3) The maximum reduction cost; (4) The reduction-cost funding, if any, other than...

  18. 50 CFR 600.1008 - Implementation plan and implementation regulations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 50 Wildlife and Fisheries 12 2012-10-01 2012-10-01 false Implementation plan and implementation regulations. 600.1008 Section 600.1008 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE MAGNUSON-STEVENS ACT PROVISIONS Fishing Capacity Reduction Framework §...

  19. SEPARATIONS AND WASTE FORMS CAMPAIGN IMPLEMENTATION PLAN

    SciTech Connect

    Vienna, John D.; Todd, Terry A.; Peterson, Mary E.

    2012-11-26

    This Separations and Waste Forms Campaign Implementation Plan provides summary level detail describing how the Campaign will achieve the objectives set-forth by the Fuel Cycle Reasearch and Development (FCRD) Program. This implementation plan will be maintained as a living document and will be updated as needed in response to changes or progress in separations and waste forms research and the FCRD Program priorities.

  20. 40 CFR 49.9986 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for... implementation plan. The implementation plan for the Reservation of the Confederated Tribes of the Coos,...

  1. The IAU Strategic Plan and its Implementation

    NASA Astrophysics Data System (ADS)

    Miley, George

    2015-03-01

    I shall review the content of the IAU Strategic Plan (SP) to use astronomy as a tool for stimulating development globally during the decade 2010 - 2020. Considerable progress has been made in its implementation since the Plan was ratified at the last General Assembly.

  2. State Plans for Implementing Programs of Study

    ERIC Educational Resources Information Center

    Lewis, Morgan V.; Overman, Laura

    2008-01-01

    This article examines how the states plan to implement the Programs of Study (POS) that were mandated by the 2006 reauthorization of the federal legislation for career and technical education. A coding system was developed for summarizing the methods described in the plans of all 50 states, the District of Columbia, Guam, and the Virgin Islands.…

  3. Waste generator services implementation plan

    SciTech Connect

    Mousseau, J.; Magleby, M.; Litus, M.

    1998-04-01

    Recurring waste management noncompliance problems have spurred a fundamental site-wide process revision to characterize and disposition wastes at the Idaho National Engineering and Environmental Laboratory. The reengineered method, termed Waste Generator Services, will streamline the waste acceptance process and provide waste generators comprehensive waste management services through a single, accountable organization to manage and disposition wastes in a timely, cost-effective, and compliant manner. This report outlines the strategy for implementing Waste Generator Services across the INEEL. It documents the culmination of efforts worked by the LMITCO Environmental Management Compliance Reengineering project team since October 1997. These efforts have included defining problems associated with the INEEL waste management process; identifying commercial best management practices; completing a review of DOE Complex-wide waste management training requirements; and involving others through an Integrated Process Team approach to provide recommendations on process flow, funding/charging mechanisms, and WGS organization. The report defines the work that will be performed by Waste Generator Services, the organization and resources, the waste acceptance process flow, the funding approach, methods for measuring performance, and the implementation schedule and approach. Field deployment will occur first at the Idaho Chemical Processing Plant in June 1998. Beginning in Fiscal Year 1999, Waste Generator Services will be deployed at the other major INEEL facilities in a phased approach, with implementation completed by March 1999.

  4. School Improvement Plan Implementation and Instructional Change.

    ERIC Educational Resources Information Center

    Ryan, Susan P.; Flinspach, Susan Leigh

    The Chicago School Reform Act mandated that schools develop and implement their own school improvement plans (SIPs) to meet systemwide goals and expected outcomes. This paper examines the implementation of SIP initiatives in 14 Chicago public schools. Data were derived from interviews with principals and advisory committee chairpersons and from…

  5. Planning and Implementing Career Education Programs: Perspectives.

    ERIC Educational Resources Information Center

    Crim, Alonzo A.; And Others

    The collection of six papers offers perspectives on planning and implementing career education programs. The first paper, the Introduction (David Goodwin), deals with program implementation. The second paper, Priorities in Career Education (Alonzo A. Crim), describes the historical origins of career education in the Atlanta school system with a…

  6. 40 CFR 49.9866 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Implementation Plan for the Burns Paiute Tribe of the Burns Paiute Indian Colony of Oregon § 49.9866 Contents of implementation plan. The implementation plan for the Reservation of the Burns Paiute Indian Colony consists...

  7. 40 CFR 49.11076 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...-Region X Implementation Plan for the Confederated Tribes of the Warm Springs Reservation of Oregon § 49.11076 Contents of implementation plan. The implementation plan for the Warm Springs Reservation...

  8. 40 CFR 49.11076 - Contents of implementation plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...-Region X Implementation Plan for the Confederated Tribes of the Warm Springs Reservation of Oregon § 49.11076 Contents of implementation plan. The implementation plan for the Warm Springs Reservation...

  9. 40 CFR 49.11076 - Contents of implementation plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...-Region X Implementation Plan for the Confederated Tribes of the Warm Springs Reservation of Oregon § 49.11076 Contents of implementation plan. The implementation plan for the Warm Springs Reservation...

  10. Oracle accrual plans from requirements to implementation

    SciTech Connect

    Rivera, Christine K

    2009-01-01

    Implementing any new business software can be an intimidating prospect and this paper is intended to offer some insight in to how to approach this challenge with some fundamental rules for success. Los Alamos National Laboratory (LANL) had undergone an original ERP implementation of HRMS, Oracle Advanced Benefits, Worker Self Service, Manager Self Service, Project Accounting, Financials and PO, and recently completed a project to implement Oracle Payroll, Time and Labor and Accrual Plans. This paper will describe some of the important lessons that can be applied to any implementation as a whole, and then specifically how this knowledge was applied to the design and deployment of Oracle Accrual Plans for LANL. Finally, detail on the functionality available in Oracle Accrual Plans will be described, as well as the detailed setups.that were utilized at LANL.

  11. Defense Special Case Transuranic Waste Implementation Plan

    SciTech Connect

    Pierce, G.D. . Joint Integration Office); Carson, P.H. Corp., Boulder, CO )

    1987-06-01

    The purpose of the Special Case Implementation Plan (SCIP) is to establish a comprehensive plan for the efficient long-term management and disposal of defense special case (SC) transuranic (TRU) waste. To fulfill this purpose, a review of SC waste management strategies (at both the site-specific and TRU program levels), waste characteristics and inventories, processing and transportation options, and disposal requirements was made. This review provides a plan for implementing policy decisions and useful information for making those decisions. The SCIP is intended to provide a baseline plant to which alternate plans can be compared. General potential alternatives are provided for future consideration when data concerning facility availability and costs are better defined. Milestones for the SC Implementation Plan are included which summarize each SC waste site. The cost of implementing the SC program has an upper limit of $89 million for the worst case scenario. The actual cost of implementation could be dramatically lower than the worst case figure. 15 refs., 3 figs., 12 tabs.

  12. 40 CFR 49.10196 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... implementation plan. The implementation plan for the Kalispel Reservation consists of the following...

  13. 40 CFR 49.10986 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... implementation plan. The implementation plan for the Tulalip Reservation consists of the following...

  14. 40 CFR 49.10346 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... implementation plan. The implementation plan for the Makah Indian Reservation consists of the following...

  15. 40 CFR 49.10376 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... implementation plan. The implementation plan for the Muckleshoot Reservation consists of the following...

  16. 40 CFR 49.10526 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... implementation plan. The implementation plan for the lands in trust that are within the Puyallup...

  17. 40 CFR 49.10766 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... implementation plan. The implementation plan for the Skokomish Reservation consists of the following...

  18. 40 CFR 49.10706 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... of implementation plan. The implementation plan for the Fort Hall Indian Reservation consists of...

  19. 40 CFR 49.10106 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... implementation plan. The implementation plan for the Reservation of the Confederated Tribes of the Grand...

  20. 40 CFR 49.11076 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... implementation plan. The implementation plan for the Warm Springs Reservation consists of the following...

  1. 40 CFR 49.10586 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... implementation plan. The implementation plan for the Quinault Reservation consists of the following...

  2. 40 CFR 49.10436 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... implementation plan. The implementation plan for the Nisqually Reservation consists of the following...

  3. 40 CFR 49.10736 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... implementation plan. The implementation plan for the Siletz Reservation consists of the following...

  4. 40 CFR 49.10676 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... Contents of implementation plan. The implementation plan for the Shoalwater Bay Indian Reservation...

  5. 40 CFR 49.10926 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... implementation plan. The implementation plan for the Port Madison Reservation consists of the following...

  6. 40 CFR 49.11106 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... implementation plan. The implementation plan for the Yakama Reservation consists of the following...

  7. 40 CFR 49.10856 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... implementation plan. The implementation plan for the Squaxin Island Reservation consists of the following...

  8. 40 CFR 49.10136 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... implementation plan. The implementation plan for the Hoh Indian Reservation consists of the following...

  9. 40 CFR 49.10496 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... Contents of implementation plan. The implementation plan for the Port Gamble Reservation consists of...

  10. 40 CFR 49.10286 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... Contents of implementation plan. The implementation plan for the Lower Elwha Reservation consists of...

  11. 40 CFR 49.10956 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... implementation plan. The implementation plan for the Swinomish Reservation consists of the following...

  12. 40 CFR 49.10556 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... implementation plan. The implementation plan for the Quileute Reservation consists of the following...

  13. 77 FR 29270 - Approval and Promulgation of Implementation Plans; State of Montana; State Implementation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-17

    ... Montana; State Implementation Plan and Regional Haze Federal Implementation Plan'' (77 FR 23988). See... technologies that provide similar control levels at higher cost. See 70 FR 39165 (July 6, 2005). We think it is..., SNCR, and SCR.'' 6. On page 24018, in Table 52, the annual emissions reduction for fuel...

  14. NERSC Strategic Implementation Plan 2002-2006

    SciTech Connect

    Kramer, William; Bethel, Wes; Craw, James; Draney, Brent; Fortney, William; Gorda, Brend; Harris, William; Meyer, Nancy; Ng, Esmond; Verdier, Francesca; Walter, Howard; Welcome, Tammy

    2002-09-01

    This strategic proposal presents NERSC's vision for its activities and new directions over the next five years. NERSC's continuing commitment to providing high-end systems and comprehensive scientific support for its users will be enhanced, and these activities will be augmented by two new strategic thrusts: support for Scientific Challenge Teams and deployment of a Unified Science Environment. The proposal is in two volumes, the Strategic Plan and the Implementation Plan.

  15. 222-S Laboratory maintenance implementation plan

    SciTech Connect

    Heinemann, J.L.

    1997-08-13

    This Maintenance Improvement Plan has been developed for maintenance functions associated with the 222-S Laboratory. This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4B, Maintenance Management Program (DOE 1994), Chapter 11. The objective of this plan is to provide information for establishing and identifying WMH conformance programs and policies applicable to implementation of DOE Order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost effective and efficient maintenance program at 222-S Laboratory. Maintenance activities are mainly going to be performed by existing maintenance organizations within Waste Management Federal Services of Hanford (WMH). Most maintenance performed at 222-S Laboratory is performed by the 222-S Laboratory maintenance organization. This 222-S Laboratory Maintenance Implementation Plan provides the interface requirements and responsibilities as they apply specifically to 222-S Laboratory. This document provides an implementation schedule which has been developed for items considered to be deficient or in need of improvement. The discussion section as applied to 222-S Laboratory implementation has been developed from a review of programs and practices utilizing the graded approach. Biennial review and additional reviews are conducted as significant programmatic and mission changes are made. This document is revised as necessary to keep this document current and in compliance with DOE requirements.

  16. 40 CFR 49.10466 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Nooksack Indian Tribe of Washington § 49.10466 Contents of implementation plan....

  17. 40 CFR 49.10166 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Jamestown S'klallam Tribe of Washington § 49.10166 Contents of implementation plan....

  18. 40 CFR 49.10046 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Cow Creek Band of Umpqua Indians of Oregon § 49.10046 Contents of implementation plan....

  19. 40 CFR 49.10406 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Nez Perce Tribe of Idaho § 49.10406 Contents of implementation plan. The...

  20. 40 CFR 49.10646 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Sauk-Suiattle Indian Tribe of Washington § 49.10646 Contents of implementation plan....

  1. 40 CFR 49.10016 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Coquille Tribe of Oregon § 49.10016 Contents of implementation plan. The...

  2. 40 CFR 49.10256 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Kootenai Tribe of Idaho § 49.10256 Contents of implementation plan. The...

  3. 40 CFR 49.10226 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Klamath Indian Tribe of Oregon § 49.10226 Contents of implementation plan....

  4. 40 CFR 49.10886 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Stillaguamish Tribe of Washington § 49.10886 Contents of implementation plan....

  5. 40 CFR 49.11046 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Upper Skagit Indian Tribe of Washington § 49.11046 Contents of implementation plan....

  6. Marketing Internships: A Planning and Implementation Guide.

    ERIC Educational Resources Information Center

    Faught, Suzanne G.

    This planning and implementation guide is designed to assist marketing educators and others supportive of marketing education. It begins with definitions of vocabulary of related terminology and descriptions of the four models of internships presented in the guide: full-year, rotation-type format; 1-semester, rotation-type format; full-year format…

  7. How to Plan and Implement a Workshop.

    ERIC Educational Resources Information Center

    Howell, Jacquie

    These guidelines were developed to assist school administrators who have the responsibility of organizing a one- to three-day professional development program. The first section outlines the tasks involved in planning and implementing a workshop. The remaining sections cover the following: (1) developing and utilizing the workshop theme; (2)…

  8. NASA Education Implementation Plan 2015-2017

    ERIC Educational Resources Information Center

    National Aeronautics and Space Administration, 2015

    2015-01-01

    The NASA Education Implementation Plan (NEIP) provides an understanding of the role of NASA in advancing the nation's STEM education and workforce pipeline. The document outlines the roles and responsibilities that NASA Education has in approaching and achieving the agency's and administration's strategic goals in STEM Education. The specific…

  9. Enterprise Resource Planning Implementation in Higher Education

    ERIC Educational Resources Information Center

    Graham, James F.

    2009-01-01

    Enterprise resource planning (ERP) implementation projects are unique to each institution and yet are expensive, time consuming, and result in change across the institution. Five Midwest public and private 4-year higher education institutions were studied to determine the impact of five specific key factors on the overall success of the ERP…

  10. Hanford Environmental Management Program implementation plan

    SciTech Connect

    Not Available

    1988-08-01

    The Hanford Environmental Management Program (HEMP) was established to facilitate compliance with the applicable environmental statues, regulations, and standards on the Hanford Site. The HEMP provides a structured approach to achieve environmental management objectives. The Hanford Environmental Management Program Plan (HEMP Plan) was prepared as a strategic level planning document to describe the program management, technical implementation, verification, and communications activities that guide the HEMP. Four basic program objectives are identified in the HEMP Plan as follows: establish ongoing monitoring to ensure that Hanford Site operations comply with environmental requirements; attain regulatory compliance through the modification of activities; mitigate any environmental consequences; and minimize the environmental impacts of future operations at the Hanford Site. 2 refs., 24 figs., 27 tabs.

  11. Interim Land Use Control Implementation Plan

    NASA Technical Reports Server (NTRS)

    Applegate, Joseph L.

    2014-01-01

    This Interim Land Use Control Implementation Plan (LUCIP) has been prepared to inform current and potential future users of the Kennedy Space Center (KSC) Contractors Road Heavy Equipment (CRHE) Area (SWMU 055; "the Site") of institutional controls that have been implemented at the Site1. Although there are no current unacceptable risks to human health or the environment associated with the CRHE Area, an interim institutional land use control (LUC) is necessary to prevent human health exposure to volatile organic compound (VOC)-affected groundwater at the Site. Controls will include periodic inspection, condition certification, and agency notification.

  12. 40 CFR 49.10406 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Contents of implementation plan. 49.10406 Section 49.10406 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes-Region X Implementation Plan for the Nez Perce...

  13. 40 CFR 49.10406 - Contents of implementation plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Contents of implementation plan. 49.10406 Section 49.10406 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes-Region X Implementation Plan for the Nez Perce...

  14. 47 CFR 51.213 - Toll dialing parity implementation plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 3 2013-10-01 2013-10-01 false Toll dialing parity implementation plans. 51... parity implementation plans. (a) A LEC must file a plan for providing intraLATA toll dialing parity... dialing parity within a state until the implementation plan has been approved by the appropriate...

  15. 47 CFR 51.213 - Toll dialing parity implementation plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 3 2012-10-01 2012-10-01 false Toll dialing parity implementation plans. 51... parity implementation plans. (a) A LEC must file a plan for providing intraLATA toll dialing parity... dialing parity within a state until the implementation plan has been approved by the appropriate...

  16. 47 CFR 51.213 - Toll dialing parity implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 3 2010-10-01 2010-10-01 false Toll dialing parity implementation plans. 51... parity implementation plans. (a) A LEC must file a plan for providing intraLATA toll dialing parity... dialing parity within a state until the implementation plan has been approved by the appropriate...

  17. 47 CFR 51.213 - Toll dialing parity implementation plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 3 2014-10-01 2014-10-01 false Toll dialing parity implementation plans. 51... parity implementation plans. (a) A LEC must file a plan for providing intraLATA toll dialing parity... dialing parity within a state until the implementation plan has been approved by the appropriate...

  18. 47 CFR 51.213 - Toll dialing parity implementation plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 3 2011-10-01 2011-10-01 false Toll dialing parity implementation plans. 51... parity implementation plans. (a) A LEC must file a plan for providing intraLATA toll dialing parity... dialing parity within a state until the implementation plan has been approved by the appropriate...

  19. 33 CFR 385.30 - Master Implementation Sequencing Plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Master Implementation Sequencing... Incorporating New Information Into the Plan § 385.30 Master Implementation Sequencing Plan. (a) Not later than... Implementation Sequencing Plan that includes the sequencing and scheduling for implementation of all of...

  20. 33 CFR 385.30 - Master Implementation Sequencing Plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Master Implementation Sequencing... Incorporating New Information Into the Plan § 385.30 Master Implementation Sequencing Plan. (a) Not later than... Implementation Sequencing Plan that includes the sequencing and scheduling for implementation of all of...

  1. 242-A Campaign 94-1 post run document

    SciTech Connect

    Guthrie, M.D.

    1994-09-30

    The purpose of this post-run document is to summarize the results of 242-A Evaporator Campaign 94-1 as required. Campaign 94-1 represents the first Evaporator operation since 1989, following completion of the B-534 upgrades and Liquid Effluent Retention Facility (LERF) construction. The purpose of Campaign 94-1 was to concentrate dilute waste from TK-102-AW, TK-106-AW, and TK-103-AP. From an available 2.87 million gallon feedstock of dilute waste contained in 102-AW, 106-AW and 103-AP, an overall Waste Volume Reduction (WVR) of 2.39 million gallons (83% WVRF) was achieved. At the completion of the campaign, approximately 477,000 gallons of dilute double-shell slurry feed (DDSSF) was produced with a SpG. of 1.25--1.30. Total process condensate discharged to LERF was 3.09 million gallons, achieving a condensate/WVR ratio of 1.29. Throughput for Campaign 94-1 was 5.27 million gallons. Total steam condensate and cooling water discharge to B-pond was 4.7 and 216 million gallons respectively. The evaporator operated approximately 43 days of the 60 day campaign for a total operating efficiency of 73%. Campaign 94-1 was completed without any discharge limit, Operating Specification Document, or Operational Safety Requirement violations. Major problems encountered during the run included the following: (1) high CA1 deentrainment pad dP`s caused by foaming, (2) condensate pump P-C100 failure, and (3) ion exchange column dP`s and efficiency.

  2. Gen IV Materials Handbook Implementation Plan

    SciTech Connect

    Rittenhouse, P.; Ren, W.

    2005-03-29

    A Gen IV Materials Handbook is being developed to provide an authoritative single source of highly qualified structural materials information and materials properties data for use in design and analyses of all Generation IV Reactor Systems. The Handbook will be responsive to the needs expressed by all of the principal government, national laboratory, and private company stakeholders of Gen IV Reactor Systems. The Gen IV Materials Handbook Implementation Plan provided here addresses the purpose, rationale, attributes, and benefits of the Handbook and will detail its content, format, quality assurance, applicability, and access. Structural materials, both metallic and ceramic, for all Gen IV reactor types currently supported by the Department of Energy (DOE) will be included in the Gen IV Materials Handbook. However, initial emphasis will be on materials for the Very High Temperature Reactor (VHTR). Descriptive information (e.g., chemical composition and applicable technical specifications and codes) will be provided for each material along with an extensive presentation of mechanical and physical property data including consideration of temperature, irradiation, environment, etc. effects on properties. Access to the Gen IV Materials Handbook will be internet-based with appropriate levels of control. Information and data in the Handbook will be configured to allow search by material classes, specific materials, specific information or property class, specific property, data parameters, and individual data points identified with materials parameters, test conditions, and data source. Details on all of these as well as proposed applicability and consideration of data quality classes are provided in the Implementation Plan. Website development for the Handbook is divided into six phases including (1) detailed product analysis and specification, (2) simulation and design, (3) implementation and testing, (4) product release, (5) project/product evaluation, and (6) product

  3. Project implementation plan: ASTD remote deployment

    SciTech Connect

    CRASS, D.W.

    1999-08-18

    This Project Implementation Plan (PIP) shall be the controlling document for the Accelerated Site Technology Deployment (ASTD) supported project to procure and qualify a remote/robotic work platform for large hot cell deactivation in the 324 Building B-Cell. This plan will be integrated into the 324/327 Buildings Stabilization/Deactivation Project, Project Management Plan, (HNF-IP-1289, Rev. 1) and shall comply with the base requirements established in that document. This PIP establishes the baseline and defines the scope, schedule, budget, organizational responsibilities, reporting requirements, deliverables, and end points for the implementation of new technology into B-Cell. This shall include procurement, safety, quality assurance, training, documentation, record management, and facility modifications applicable to this project. Specifically this plan controls and executes the procurement and acceptance, qualification, and turnover of a remote/robotic work platform for 324 Building B-Cell. This includes the development of functional parameters, performance requirements, evaluation criteria, procurement specifications, acceptance and qualification test procedures, training requirements, and turnover responsibilities. The 324/237 Buildings Stabilization/Deactivation Project is currently in its second year of a nine-year project to complete deactivation and closure of the facility for long-term surveillance and maintenance. A major obstacles for the project is the inability to effectively perform deactivation tasks within high radioactively contaminated hot cells. The current strategies utilize inefficient and resource intensive technologies that significantly impact the cost and schedule for stabilization and deactivation. The ASTD Remote Deployment Project shall identify, procure, and turnover, to the B-Cell project, a remote/robot work platform to improve B-Cell cleanup productivity and enhance worker safety and health.

  4. Implementation Issues for Departure Planning Systems

    NASA Technical Reports Server (NTRS)

    Hansman, R. John; Feron, Eric; Clarke, John-Paul; Odoni, Amedeo

    1999-01-01

    The objective of the proposed effort is to investigate issues associated with the design and implementation of decision aiding tools to assist in improving the departure process at congested airports. This effort follows a preliminary investigation of potential Departure Planning approaches and strategies, which identified potential benefits in departure efficiency, and also in reducing the environmental impact of aircraft in the departure queue. The preliminary study bas based, in large part, on observations and analysis of departure processes at Boston, Logan airport. The objective of this follow-on effort is to address key implementation issues and to expand the observational base to include airports with different constraints and traffic demand. Specifically, the objectives of this research are to: (1) Expand the observational base to include airports with different underlying operational dynamics. (2) Develop prototype decision aiding algorithms/approaches and assess potential benefits. and (3) Investigate Human Machine Integration (HMI) issues associated with decision aids in tower environments.

  5. 12 CFR 1291.3 - AHP Implementation Plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 7 2010-01-01 2010-01-01 false AHP Implementation Plan. 1291.3 Section 1291.3...' AFFORDABLE HOUSING PROGRAM § 1291.3 AHP Implementation Plan. (a) Adoption; no delegation. Each Bank, after consultation with its Advisory Council, shall adopt a written AHP Implementation Plan, and shall not amend...

  6. 40 CFR 51.1002 - Submittal of State implementation plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Implementation of PM2.5 National Ambient Air Quality Standards § 51.1002 Submittal of State implementation plan... State implementation plan satisfying the requirements of section 172 of the Act and this subpart to EPA...) The State must submit a plan consistent with the requirements of section 110(a)(2) of the Act...

  7. 40 CFR 49.9896 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Confederated Tribes of the Chehalis Reservation, Washington § 49.9896 Contents of...

  8. 40 CFR 49.10826 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Spokane Tribe of the Spokane Reservation, Washington § 49.10826 Contents of...

  9. 40 CFR 49.10316 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Lummi Tribe of the Lummi Reservation, Washington § 49.10316 Contents of...

  10. 40 CFR 49.9956 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Confederated Tribes of the Colville Reservation, Washington § 49.9956 Contents of...

  11. 40 CFR 49.9926 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49... ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Coeur D'alene Tribe of the Coeur D'alene Reservation, Idaho § 49.9926 Contents of...

  12. 49 CFR 37.143 - Paratransit plan implementation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Paratransit plan implementation. 37.143 Section 37... WITH DISABILITIES (ADA) Paratransit as a Complement to Fixed Route Service § 37.143 Paratransit plan implementation. (a) Each entity shall begin implementation of its complementary paratransit plan, pending...

  13. 40 CFR 209.10 - Approval of plan, implementation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 25 2011-07-01 2011-07-01 false Approval of plan, implementation. 209... Approval of plan, implementation. (a) If the Administrator finds that the remedial plan is designed to... plan is not approved, the Administrator will provide the respondent with written notice of...

  14. WHC natural phenomena hazards mitigation implementation plan

    SciTech Connect

    Conrads, T.J.

    1996-09-11

    Natural phenomena hazards (NPH) are unexpected acts of nature which pose a threat or danger to workers, the public or to the environment. Earthquakes, extreme winds (hurricane and tornado),snow, flooding, volcanic ashfall, and lightning strike are examples of NPH at Hanford. It is the policy of U.S. Department of Energy (DOE) to design, construct and operate DOE facilitiesso that workers, the public and the environment are protected from NPH and other hazards. During 1993 DOE, Richland Operations Office (RL) transmitted DOE Order 5480.28, ``Natural Phenomena Hazards Mitigation,`` to Westinghouse Hanford COmpany (WHC) for compliance. The Order includes rigorous new NPH criteria for the design of new DOE facilities as well as for the evaluation and upgrade of existing DOE facilities. In 1995 DOE issued Order 420.1, ``Facility Safety`` which contains the same NPH requirements and invokes the same applicable standards as Order 5480.28. It will supersede Order 5480.28 when an in-force date for Order 420.1 is established through contract revision. Activities will be planned and accomplished in four phases: Mobilization; Prioritization; Evaluation; and Upgrade. The basis for the graded approach is the designation of facilities/structures into one of five performance categories based upon safety function, mission and cost. This Implementation Plan develops the program for the Prioritization Phase, as well as an overall strategy for the implemention of DOE Order 5480.2B.

  15. Science operations planning and implementation for Rosetta

    NASA Astrophysics Data System (ADS)

    Koschny, Detlef; Sweeney, Mark; Montagon, Elsa; Hoofs, Raymond; van der Plas, Peter

    2002-07-01

    The Rosetta mission is a cornerstone mission of the Horizon 2000 programme of the European Space Agency. It will be launched to comet 46P/Wirtanen in January 2003. This mission is the first of a series of planetary missions, including Mars Express, Smart-I (to the Moon), and BepiColombo (to Mercury). All these missions have similar requirements for their scientific operations. The Experiments H/W and S/W are developed by Principal Investigators, working at scientific institutes. They are also responsible for the operation of their experiments and for the generation of related operational documentation. The Science Operations Centre (SOC) has the task to consolidate the inputs of the different experimenters and the Lander and ensure that the resulting science operations timeline is free of conflicts. It forwards this timeline to the Mission Operations Centre (MOC) which combines the science operations with the operations of the other spacecraft subsystems and the orbit and attitude of the spacecraft. The MOC is also responsible for uplinking the operational command sequences to the spacecraft and for returning the received telemetry to the user. In a collaboration between the team of the Rosetta Project Scientist at the Research and Science Support Department of ESA/ESTEC and the European Space Operations Centre (ESA/ESOC), a concept for the SOC/MOC and their interfaces was developed for the Rosetta mission. This concept is generic enough to allow its implementation also for the other planetary missions. The design phase is now complete, and implementation is on-going. This paper briefly presents the architecture of the complex ground segment, concentrating on the elements required for planning of scientific operations, and then details the software tools EPS (Experiment Planning System) and PTB (Project Test Bed) which are used in the planning process.

  16. 40 CFR 51.851 - State implementation plan (SIP) or Tribal implementation plan (TIP) revision.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... CFR 49.6) may submit to the Environmental Protection Agency (EPA) a revision to its applicable... applicable implementation plan, consistent with this section and 40 CFR part 93, subpart B. (b) Until EPA... the provisions of 40 CFR part 93, subpart B in addition to any existing applicable State or...

  17. 75 FR 79327 - Finding of Substantial Inadequacy of Implementation Plan; Call for Utah State Implementation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-20

    ... 19, 2010 (75 FR 70888). In the November 19, 2010 document, EPA proposed a finding that the Utah State... AGENCY 40 CFR Part 52 Finding of Substantial Inadequacy of Implementation Plan; Call for Utah State... additional information on submitting comments, see the November 19, 2010 (75 FR 70888) proposed rule....

  18. 75 FR 52470 - Approval and Promulgation of Implementation Plans Georgia: State Implementation Plan Revision...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-26

    ...On February 9, 2010, EPA published a direct final rule approving revisions to the Georgia State Implementation Plan submitted by the Georgia Environmental Protection Division on September 26, 2006, with a clarifying revision submitted on November 6, 2006. This action corrects a typographical error in the regulatory text in Table (c) of the aforementioned Federal Register...

  19. Administrator's Guide to Technology: Planning, Funding & Implementation.

    ERIC Educational Resources Information Center

    Aspen Education Development Group, Gaithersburg, MD.

    This document provides guidelines for administrators related to instructional technology and planning. Chapter 1 discusses planning, including developing a technology plan, facility assessment, e-rate planning, formation of a technology committee, budget planning, and hardware/software replacement plan and costs. Chapter 2 addresses…

  20. 77 FR 24160 - Revisions to the Hawaii State Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-23

    ... AGENCY 40 CFR Part 52 Revisions to the Hawaii State Implementation Plan AGENCY: Environmental Protection... Implementation Plan (SIP). These revisions would update and replace the minor new source review rules that EPA... not plan to open a second comment period, so anyone interested in commenting should do so at this...

  1. 49 CFR 130.33 - Response plan implementation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION OIL TRANSPORTATION OIL SPILL PREVENTION AND RESPONSE PLANS § 130.33 Response plan implementation. If, during transportation of oil subject to this part, a... management authority of, the United States—the person transporting the oil shall implement the plan...

  2. 49 CFR 130.33 - Response plan implementation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION OIL TRANSPORTATION OIL SPILL PREVENTION AND RESPONSE PLANS § 130.33 Response plan implementation. If, during transportation of oil subject to this part, a... management authority of, the United States—the person transporting the oil shall implement the plan...

  3. 49 CFR 130.33 - Response plan implementation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION OIL TRANSPORTATION OIL SPILL PREVENTION AND RESPONSE PLANS § 130.33 Response plan implementation. If, during transportation of oil subject to this part, a... management authority of, the United States—the person transporting the oil shall implement the plan...

  4. 49 CFR 130.33 - Response plan implementation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION OIL TRANSPORTATION OIL SPILL PREVENTION AND RESPONSE PLANS § 130.33 Response plan implementation. If, during transportation of oil subject to this part, a... management authority of, the United States—the person transporting the oil shall implement the plan...

  5. 49 CFR 130.33 - Response plan implementation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION OIL TRANSPORTATION OIL SPILL PREVENTION AND RESPONSE PLANS § 130.33 Response plan implementation. If, during transportation of oil subject to this part, a... management authority of, the United States—the person transporting the oil shall implement the plan...

  6. Implementation of Discharge Plans for Chronically Ill Elders Discharged Home.

    ERIC Educational Resources Information Center

    Proctor, Enola K.; And Others

    1996-01-01

    Addresses the extent to which discharge plans for elderly patients with congestive heart failure were implemented as planned, tested the consequences of implementation problems, and identified factors associated with implementation problems. Implications for hospital discharge planners and home health care are discussed. (KW)

  7. 40 CFR 51.1002 - Submittal of State implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 2 2011-07-01 2011-07-01 false Submittal of State implementation plan. 51.1002 Section 51.1002 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Provisions for Implementation of PM2.5 National Ambient...

  8. Easing the Transition: How to Implement an Automated Succession Plan.

    ERIC Educational Resources Information Center

    Andrews, Jean P.

    1989-01-01

    An automated succession plan can create smooth transitions when employees transfer or leave the company. It can also boost productivity and employee morale. (Includes a basic nine-step implementation plan that makes the process easy and relatively painless.) (JOW)

  9. Project Management Plan (PMP) for Work Management Implementation

    SciTech Connect

    SHIPLER, C.E.

    2000-01-13

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  10. Implementing corporate wellness programs: a business approach to program planning.

    PubMed

    Helmer, D C; Dunn, L M; Eaton, K; Macedonio, C; Lubritz, L

    1995-11-01

    1. Support of key decision makers is critical to the successful implementation of a corporate wellness program. Therefore, the program implementation plan must be communicated in a format and language readily understood by business people. 2. A business approach to corporate wellness program planning provides a standardized way to communicate the implementation plan. 3. A business approach incorporates the program planning components in a format that ranges from general to specific. This approach allows for flexibility and responsiveness to changes in program planning. 4. Components of the business approach are the executive summary, purpose, background, ground rules, approach, requirements, scope of work, schedule, and financials.

  11. 75 FR 69373 - Source Specific Federal Implementation Plan for Implementing Best Available Retrofit Technology...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-12

    ... AGENCY 40 CFR Part 49 Source Specific Federal Implementation Plan for Implementing Best Available Retrofit Technology for Four Corners Power Plant: Navajo Nation AGENCY: Environmental Protection Agency...) ] signed a proposal to promulgate a source specific Federal Implementation Plan (FIP) requiring the...

  12. Implementation Plan for 1998-1999. Dalton State College Strategic Plan, 1997-2000.

    ERIC Educational Resources Information Center

    Dalton College, GA. Office of Institutional Research and Planning.

    This document presents the second-year implementation plans for 1998-1999 of Dalton State College's Strategic Plan for 1997-2000. It contains the following planning priorities and action plans for the roles of the: President; Office of Institutional Research and Planning; Office of Public Relations; Dean of Academic Affairs; Division of Business…

  13. 40 CFR 93.151 - State implementation plan (SIP) revision.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... SIP revision allowed under 40 CFR 51.851. When EPA approves a State's or Tribe's conformity provisions... 40 Protection of Environment 20 2010-07-01 2010-07-01 false State implementation plan (SIP... implementation plan (SIP) revision. The Federal conformity rules under this subpart, in addition to any...

  14. 40 CFR 93.151 - State implementation plan (SIP) revision.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 CFR 51.851. When EPA approves a State's or Tribe's conformity provisions (or a portion thereof) in... 40 Protection of Environment 20 2011-07-01 2011-07-01 false State implementation plan (SIP... implementation plan (SIP) revision. The provisions and requirements of this subpart to demonstrate...

  15. 40 CFR 51.390 - Implementation plan revision.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... U.S.C. or the Federal Transit Laws § 51.390 Implementation plan revision. (a) Purpose and... 40 Protection of Environment 2 2014-07-01 2014-07-01 false Implementation plan revision. 51.390 Section 51.390 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR...

  16. Planning, Developing and Implementing Title III, ESEA Projects.

    ERIC Educational Resources Information Center

    Miller, Donald R.

    This document analyzes the planning, developing, and implementing of fundable Title III, ESEA projects, by integrating the following five strategies: (1) A planning development and implementation strategy, (2) a risk-gain motivation strategy, (3) a problem-solving strategy, (4) a quality assurance and evaluation strategy, and (5) a management…

  17. 40 CFR 49.9866 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the Burns Paiute Tribe of the Burns Paiute Indian Colony of Oregon § 49.9866 Contents of implementation plan. The implementation plan for the Reservation of the Burns Paiute Indian Colony consists of...) Section 49.131General rule for open burning. (h) Section 49.135Rule for emissions detrimental to...

  18. Westinghouse Hanford Company Pollution Prevention Program Implementation Plan

    SciTech Connect

    Floyd, B.C.

    1994-10-01

    This plan documents Westinghouse Hanford Company`s (WHC) Pollution Prevention (P2) (formerly Waste Minimization) program. The program includes WHC; BCS Richland, Inc. (BCSR); and ICF Kaiser Hanford Company (ICF KH). The plan specifies P2 program activities and schedules for implementing the Hanford Site Waste Minimization and Pollution Prevention Awareness (WMin/P2) Program Plan requirements (DOE 1994a). It is intended to satisfy the U.S. Department of Energy (DOE) and other legal requirements that are discussed in both the Hanford Site WMin/P2 plan and paragraph C of this plan. As such, the Pollution Prevention Awareness Program required by DOE Order 5400.1 (DOE 1988) is included in the WHC P2 program. WHC, BCSR, and ICF KH are committed to implementing an effective P2 program as identified in the Hanford Site WMin/P2 Plan. This plan provides specific information on how the WHC P2 program will develop and implement the goals, activities, and budget needed to accomplish this. The emphasis has been to provide detailed planning of the WHC P2 program activities over the next 3 years. The plan will guide the development and implementation of the program. The plan also provides background information on past program activities. Because the plan contains greater detail than in the past, activity scope and implementation schedules may change as new priorities are identified and new approaches are developed and realized. Some activities will be accelerated, others may be delayed; however, all of the general program elements identified in this plan and contractor requirements identified in the Site WMin/P2 plan will be developed and implemented during the next 3 years. This plan applies to all WHC, BCSR, and ICF KH organizations and subcontractors. It will be distributed to those with defined responsibilities in this plan; and the policy, goals, objectives, and strategy of the program will be communicated to all WHC, BCSR, and ICF KH employees.

  19. Implementing successful strategic plans: a simple formula.

    PubMed

    Blondeau, Whitney; Blondeau, Benoit

    2015-01-01

    Strategic planning is a process. One way to think of strategic planning is to envision its development and design as a framework that will help your hospital navigate through internal and external changing environments over time. Although the process of strategic planning can feel daunting, following a simple formula involving five steps using the mnemonic B.E.G.I.N. (Begin, Evaluate, Goals & Objectives, Integration, and Next steps) will help the planning process feel more manageable, and lead you to greater success. PMID:26058285

  20. Savannah River Site Environmental Implementation Plan. Volume 2, Protection programs

    SciTech Connect

    Not Available

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  1. Implementing change in the facilities planning process

    SciTech Connect

    Williams, J.L.

    1995-08-01

    In the post-Cold War climate of reduced budgets at the national laboratories, the Sites Planning Department at Sandia National Laboratories was faced with the problem of securing funding for capital construction projects in a very competitive environment. The Department of Energy (DOE), felt that requests for new facilities were not always well coordinated with its mission needs. The Sites Planning Department needed to revolutionize the way they were doing business. To be successful in obtaining approval and funding for future facilities, they recognized the need to concentrate their efforts on project proposals that tap strategic programs at DOE. The authors developed a series of new processes to identify, evaluate, prioritize, and develop line item project proposals to request approval and obtain funding. A matrixed group of sites and facilities directors was formed to establish criteria and make preliminary recommendations to upper management. Matrixed working groups were also established at the staff level to develop and prepare projects for the prioritization process. Ultimately, similar processes will be applied to all project types, and a prioritized plan generated for each. These plans will become the blueprint for an overarching strategic site plan. What started as a means of increasing success in obtaining approval and funding of capital projects has launched a whole new approach to project development that permits incorporation of facilities planning into overall corporate strategic planning.

  2. Management implementation plan for a safety analysis and review system

    SciTech Connect

    Hulburt, D.A.; Berkey, B.D.

    1981-04-01

    The US Department of Energy has issued an Order, DOE 5481.1, which establishes uniform requirements for the preparation and review of Safety Analysis for DOE Operations. The Management Implementation Plan specified herein establishes the administrative procedures and technical requirements for implementing DOE 5481.1 to Operations under the cognizance of the Pittsburgh Energy Technology Center. This Implementation Plan is applicable to all present and future Operations under the cognizance of PETC. The Plan identifies those Operations for which DOE 5481.1 is applicable and those Operations for which no further analysis is required because the initial determination and review has concluded that DOE 5481.1 does not apply.

  3. Orbiting deep space relay station. Volume 3: Implementation plan

    NASA Technical Reports Server (NTRS)

    Hunter, J. A.

    1979-01-01

    An implementation plan for the Orbiting Deep Space Relay Station (ODSRS) is described. A comparison of ODSRS life cycle costs to other configuration options meeting future communication requirements is presented.

  4. AQUATIC STRESSORS: FRAMEWORK AND IMPLEMENTATION PLAN FOR EFFECTS RESEARCH

    EPA Science Inventory

    This document describes the framework and research implementation plans for ecological effects research on aquatic stressors within the National Health and Environmental Effects Laboratory. The context for the research identified within the framework is the common management goal...

  5. 76 FR 33651 - Approval and Promulgation of Implementation Plans; ID

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-09

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; ID AGENCY: Environmental... includes new and revised rules which provide the Idaho Department of Environmental Quality (IDEQ)...

  6. Handbook for Decentralized Education Planning. Implementing National EFA Plans

    ERIC Educational Resources Information Center

    Online Submission, 2005

    2005-01-01

    The Dakar 2000 goal of Education For All (EFA) is at the center of UNESCO's education activities worldwide. The wide-ranging efforts to achieve EFA in many countries involve education reform, development strategies and plans. Decentralization, a major component in modernizing the public sector, is also applicable to the education sector. The…

  7. 40 CFR 51.1002 - Submittal of State implementation plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    .... 51.1002 Section 51.1002 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Implementation of PM2.5 National Ambient Air Quality Standards § 51.1002 Submittal of State implementation plan. (a) For any area designated by EPA as nonattainment for the PM2.5 NAAQS, the State must submit...

  8. 76 FR 51264 - Approval and Promulgation of Implementation Plans; New York Reasonable Further Progress Plans...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-18

    ... 31, 2011 (76 FR 17801), EPA proposed approval of the New York State Implementation Plan (SIP.... Conclusion EPA has evaluated New York's submittal for consistency with the Clean Air Act and Agency... AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; New York Reasonable...

  9. 40 CFR 49.11080 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Implementation Plans for Tribes-Region X Implementation Plan for the Confederated Tribes of the Warm Springs... following regulations are incorporated and made part of the implementation plan for the Warm...

  10. 40 CFR 49.11080 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Implementation Plans for Tribes-Region X Implementation Plan for the Confederated Tribes of the Warm Springs... following regulations are incorporated and made part of the implementation plan for the Warm...

  11. 40 CFR 49.11080 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Implementation Plans for Tribes-Region X Implementation Plan for the Confederated Tribes of the Warm Springs... following regulations are incorporated and made part of the implementation plan for the Warm...

  12. 94-1 Research and Development Project Lead laboratory support. Status report, October 1--December 31, 1995

    SciTech Connect

    Dinehart, M.

    1996-05-01

    This is a quarterly progress report of the 94-1 Research and Development Lead Laboratory Support Technical Program Plan for the first quarter of FY 1996. The report provides details concerning descriptions, DOE-complex-wide material stabilization technology needs, scientific background and approach, progress, benefits to the DOE complex, and collaborations for selected subprojects. An executive summary and report on end-of-quarter spending is included.

  13. Perioperative Research Fellowship: Planning, Implementation, Experience

    PubMed Central

    Memtsoudis, Stavros G; Mazumdar, Madhu; Stundner, Ottokar; Hargett, Mary J.

    2014-01-01

    Perioperative outcomes research has gained widespread interest and is viewed as increasingly important among different specialties, including anesthesiology. Outcome research studies serve to help in the adjustment of risk, allocation of resources, and formulation of hypotheses to guide future research. Pursuing high quality research projects requires familiarity with a wide range of research methodologies, and concepts are ideally learned in a dedicated setting. Skills associated with the use of these methodologies as well as with scientific publishing in general, however, are increasingly challenging to acquire. This article is intended to describe the curriculum and implementation of the Perioperative Medicine and Regional Anesthesia Research Fellowship at the Hospital for Special Surgery. We also propose a methodology to evaluate the success of a research fellowship curriculum. PMID:24942850

  14. Achieving succession planning and implementation: one healthcare network's story.

    PubMed

    Capuano, Terry Ann; MacKenzie, Richard

    2013-01-01

    Frequent transitions in leadership can cause inefficiency, inconsistency, and lack of alignment with priorities and strategy. Retaining management talent and collaboratively planning their succession can help ensure organizational survival. Succession planning, in healthcare and other industries, addresses some of these concerns; however, there is a dearth of descriptive articles emphasizing "how to." This article demonstrates one healthcare network's comprehensive system for succession planning and implementation. Leaders looking to plan their human resource processes for organizational sustainability would be able to emulate and adapt practices for their networks.

  15. Achieving succession planning and implementation: one healthcare network's story.

    PubMed

    Capuano, Terry Ann; MacKenzie, Richard

    2013-01-01

    Frequent transitions in leadership can cause inefficiency, inconsistency, and lack of alignment with priorities and strategy. Retaining management talent and collaboratively planning their succession can help ensure organizational survival. Succession planning, in healthcare and other industries, addresses some of these concerns; however, there is a dearth of descriptive articles emphasizing "how to." This article demonstrates one healthcare network's comprehensive system for succession planning and implementation. Leaders looking to plan their human resource processes for organizational sustainability would be able to emulate and adapt practices for their networks. PMID:24409581

  16. Implementing Strategic Environmental Assessment of spatial planning tools

    SciTech Connect

    De Montis, Andrea

    2013-07-15

    After more than a decade from the publication of the European Directive 2001/42/CE (Directive) on Strategic Environmental Assessment (SEA), the design and construction of the interested spatial planning instruments has gone through a variety of changes and integrations in European and in world states. This inhomogeneous panorama can be explained with a pattern of institutional structures that have so far affected the implementation of the Directive. The aim of this paper is to investigate the level of implementation of the Directive in Italy by developing a comparative analysis of the quality of integration of SEA within the design of the spatial coordination plan of a set of Italian provinces. Italian practice is analyzed in the framework of a comparative study of worldwide SEA implementation within spatial and land use planning. The results reveal strengths and weaknesses in SEA implementation at the provincial level and, in particular, the emergence of critical areas of research concerning institutional context, public participation, monitoring, and observatory of the spatial transformations. -- Highlights: • This is a comparative analysis of SEA in strategic spatial planning in Italy. • The adhesion of Provinces to the study is remarkable. • SEA implementation and integration into spatial planning is still moderate. • Participation via consultations should be more widespread. • Monitoring and institution of observatories are still in an infancy stage.

  17. Implementation plan for Bolivian Mineral Exploration Fund

    USGS Publications Warehouse

    Kirkemo, Harold

    1978-01-01

    Bolivia ranks second among world producers of tin and antimony, and first in bismuth production. Mineral exports in 1975 were valued at $314.2 million, nearly 60 percent of the value of all exports, and petroleum product exports totalled nearly $157 million, or 30 percent of the total. Tin accounted for 58 percent of the total value of metallic mineral exports. The central government derived about 19 percent of its total tax revenues in 1975 from the mining sector. The mining sector consists of the large, medium, and small mining subsectors, a classification established by the government. Individual operations are referred to as large, medium, or small depending upon the subsector into which they are classified. All large mining enterprises are owned and operated by a government corporation, COMIBOL; the medium and small operations are privately owned. COMIBOL's exports in 1975 were valued at $171.8 million or 70 percent of the total mineral exports; the medium mines accounted for $55.5 million or 23 percent, and the small mines for $17.5 million or 7 percent of the total. The combination of high operating costs, low productivity, inadequate ore reserves, and insufficient risk capital for exploration and development has led to the realization that there is an urgent need to improve the situation for mining in Bolivia. Proposals are being studied to revise the tax code, a program is underway to evaluate selected mineral deposits for possible exploration and development, and programs are under consideration to encourage minerals exploration. A minerals exploration plan is proposed which would offer technical and financial aid to various segments in the minerals field. A program, estimated to cost between $2 million and $2.5 million annually, and to be operated by a new agency in the Ministry of Mining and Metallurgy, is outlined.

  18. 40 CFR 93.124 - Using the motor vehicle emissions budget in the applicable implementation plan (or implementation...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) DETERMINING... Implementation Plans of Transportation Plans, Programs, and Projects Developed, Funded or Approved Under Title...

  19. 40 CFR 93.124 - Using the motor vehicle emissions budget in the applicable implementation plan (or implementation...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) DETERMINING... Implementation Plans of Transportation Plans, Programs, and Projects Developed, Funded or Approved Under Title...

  20. Update of the used fuel disposition Campaign Implementation Plan

    SciTech Connect

    Birkholzer, Jens; MacKinnon, Robert; McMahon, Kevin; Saltzstein, Sylvia; Sorenson, Ken; Swift, Peter

    2014-09-01

    This Campaign Implementation Plan provides summary level detail describing how the Used Fuel Disposition Campaign (UFDC) supports achievement of the overarching mission and objectives of the Department of Energy Office of Nuclear Energy Fuel Cycle Technologies Program The implementation plan begins with the assumption of target dates that are set out in the January 2013 DOE Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste (http://energy.gov/downloads/strategy-management-and-disposal-used-nuclear-fuel-and-high-level-radioactive-waste). These target dates and goals are summarized in section III. This implementation plan will be maintained as a living document and will be updated as needed in response to progress in the Used Fuel Disposition Campaign and the Fuel Cycle Technologies Program.

  1. Tank waste remediation system configuration management implementation plan

    SciTech Connect

    Vann, J.M.

    1998-03-31

    The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from the life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program.

  2. High performance computing and communications: FY 1996 implementation plan

    SciTech Connect

    1995-05-16

    The High Performance Computing and Communications (HPCC) Program was formally authorized by passage of the High Performance Computing Act of 1991, signed on December 9, 1991. Twelve federal agencies, in collaboration with scientists and managers from US industry, universities, and research laboratories, have developed the Program to meet the challenges of advancing computing and associated communications technologies and practices. This plan provides a detailed description of the agencies` HPCC implementation plans for FY 1995 and FY 1996. This Implementation Plan contains three additional sections. Section 3 provides an overview of the HPCC Program definition and organization. Section 4 contains a breakdown of the five major components of the HPCC Program, with an emphasis on the overall directions and milestones planned for each one. Section 5 provides a detailed look at HPCC Program activities within each agency.

  3. Implementation plan for engineering research, development and demonstration

    SciTech Connect

    Not Available

    1994-10-01

    This document contains information on the planned implementation of the EMF RAPID Program`s engineering activities. It describes the approach and specific projects required to achieve the goals laid out in the EMF Engineering Research component of the Research Agenda and Communication Plan. In addition to efforts funded by the RAPID Program, ongoing quality assurance and dosimetry research currently funded by the DOE EMF Biological Mechanisms Research Program are considered essential to achieving the goals of the RAPID Program.

  4. RCRA implementation plan (RIP): Fiscal years 1996--1997

    SciTech Connect

    1995-05-01

    The report defines the national policy and strategic goals and priority activities for the RCRA solid and hazardous waste program. Includes both changes and clarifications to the fiscal year 1994 RCRA implementation plan and the fiscal year 1995 addendum. It provides additional guidance in waste minimization, corrective action, state grants, beginning of the year plans, Indian programs, environmental justice, information management, state authorization, permitting/closure, and subtitle D activities.

  5. A process for implementation of the strategic plan: from strategic planning toward strategic management.

    PubMed

    Chenoy, N C; Morrison, M J; Carlow, D R

    1991-01-01

    Although the principles and process for developing a strategic plan are well established, little information exists on how organizations can implement these plans. The authors developed a framework and methodology for The Ontario Cancer Institute/Princess Margaret Hospital that connects the implementation of the strategic plan with resource allocation and the budget; thus, the budget is a quantified expression of the strategic plan. To accomplish this, a specific cycle of events leading to the development of a corporate calendar was undertaken, which results in the establishment of the annual budget.

  6. Systems engineering implementation plan for the liquid effluents services program

    SciTech Connect

    Lowe, S.S.

    1995-01-01

    A graded approach is being taken by the Liquid Effluents Services Program in implementing systems engineering because of the advanced state of the program. The approach is cost-effective and takes credit for related work already completed, yet retains the benefits of systems engineering. This plan describes how the Liquid Effluents Services Program will implement systems engineering so there is a common understanding. Systems engineering work to be performed and the products of that work are identified. The relation to the current planning process and integration with the sitewide systems engineering effort is described.

  7. Development and implementation of an interdisciplinary plan of care.

    PubMed

    Lewis, Cynthia; Hoffmann, Mary Lou; Gard, Angela; Coons, Jacqueline; Bichinich, Pat; Euclid, Jeff

    2005-01-01

    In January 2002 Aurora Health Care Metro Region chartered an interdisciplinary team to develop a process and structure for patient-centered interdisciplinary care planning. This unique endeavor created a process that includes the patient, family, and all clinical disciplines involved in planning and providing care to patients from system point of entry throughout the entire acute care episode. The interdisciplinary plan of care (IPOC) demonstrates the integration of prioritized problems, outcomes, and measurement toward goal attainment. This article focuses on the journey of this team to the successful implementation of an IPOC.

  8. 33 CFR 385.30 - Master Implementation Sequencing Plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Master Implementation Sequencing Plan. 385.30 Section 385.30 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROGRAMMATIC REGULATIONS FOR THE COMPREHENSIVE EVERGLADES RESTORATION...

  9. 28 CFR 90.23 - State implementation plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 90.23 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) VIOLENCE AGAINST WOMEN The STOP (Services ⢠Training ⢠Officers ⢠Prosecutors) Violence Against Women Formula Grant Program § 90.23 State... purposes of the Violence Against Women Act. (b) The implementation plan should describe how the State,...

  10. 28 CFR 90.23 - State implementation plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 90.23 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) VIOLENCE AGAINST WOMEN The STOP (Services ⢠Training ⢠Officers ⢠Prosecutors) Violence Against Women Formula Grant Program § 90.23 State... purposes of the Violence Against Women Act. (b) The implementation plan should describe how the State,...

  11. 28 CFR 90.23 - State implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 90.23 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) VIOLENCE AGAINST WOMEN The STOP (Services ⢠Training ⢠Officers ⢠Prosecutors) Violence Against Women Formula Grant Program § 90.23 State... purposes of the Violence Against Women Act. (b) The implementation plan should describe how the State,...

  12. 49 CFR 236.1011 - PTC Implementation Plan content requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... refers to use, pursuant to subpart H of this part, of technology embedded in PTC systems that does not... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1011 PTC Implementation Plan content requirements. Link to...

  13. Global Education-An Implementation Plan & Resource Guide.

    ERIC Educational Resources Information Center

    Sny, Chris

    This guide contains a rationale, plan, and bibliography for the implementation of a K-12, district wide, global education program. Parts one and two of the guide provide a definition of and rationale for global education. Global education is defined as the lifelong growth in understanding, through study and participation, of the world community…

  14. Implementation plan for HANDI 2000 TWRS master equipment list

    SciTech Connect

    BENNION, S.I.

    1999-03-25

    This document presents the implementation plan for an additional deliverable of the HANDI 2000 Project. The PassPort Equipment Data module processes include those portions of the COTS PassPort system required to support tracking and management of the Master Equipment List for Lockheed Martin Hanford Company (LMHC) and custom software created to work with the COTS products.

  15. Current Strategic Business Plan for the Implementation of Digital Systems.

    ERIC Educational Resources Information Center

    Library of Congress, Washington, DC. National Library Service for the Blind and Physically Handicapped.

    This document presents a current strategic business plan for the implementation of digital systems and services for the free national library program operated by the National Library Service for the Blind and Physically Handicapped, Library of Congress, its network of cooperating regional and local libraries, and the United States Postal Service.…

  16. 2016-2020 Strategic Plan and Implementing Framework

    SciTech Connect

    2015-11-01

    The 2016-2020 Strategic Plan and Implementing Framework from the Office of Energy Efficiency and Renewable Energy (EERE) is the blueprint for launching the nation’s leadership in the global clean energy economy. This document will guide the organization to build on decades of progress in powering our nation from clean, affordable and secure energy.

  17. Implementing the Plan. Competency Based Teaching Materials in Horticulture.

    ERIC Educational Resources Information Center

    Legacy, Jim; And Others

    This competency-based curriculum unit on implementing the landscape plan is one of five developed for classroom use in teaching the landscape/nursery area of horticulture. The seven sections are each divided into teaching content (in a question-and-answer format) and student skills that outline steps and factors for consideration. Topics covered…

  18. 45 CFR 162.512 - Implementation specifications: Health plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 1 2012-10-01 2012-10-01 false Implementation specifications: Health plans. 162.512 Section 162.512 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES ADMINISTRATIVE DATA STANDARDS AND RELATED REQUIREMENTS ADMINISTRATIVE REQUIREMENTS Standard Unique Health Identifier for...

  19. 45 CFR 162.512 - Implementation specifications: Health plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 1 2014-10-01 2014-10-01 false Implementation specifications: Health plans. 162.512 Section 162.512 Public Welfare Department of Health and Human Services ADMINISTRATIVE DATA STANDARDS AND RELATED REQUIREMENTS ADMINISTRATIVE REQUIREMENTS Standard Unique Health Identifier for...

  20. 45 CFR 162.512 - Implementation specifications: Health plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 1 2013-10-01 2013-10-01 false Implementation specifications: Health plans. 162.512 Section 162.512 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES ADMINISTRATIVE DATA STANDARDS AND RELATED REQUIREMENTS ADMINISTRATIVE REQUIREMENTS Standard Unique Health Identifier for...

  1. 45 CFR 162.412 - Implementation specifications: Health plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Implementation specifications: Health plans. 162.412 Section 162.412 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES ADMINISTRATIVE DATA STANDARDS AND RELATED REQUIREMENTS ADMINISTRATIVE REQUIREMENTS Standard Unique Health Identifier for...

  2. 45 CFR 162.412 - Implementation specifications: Health plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 1 2014-10-01 2014-10-01 false Implementation specifications: Health plans. 162.412 Section 162.412 Public Welfare Department of Health and Human Services ADMINISTRATIVE DATA STANDARDS AND RELATED REQUIREMENTS ADMINISTRATIVE REQUIREMENTS Standard Unique Health Identifier for...

  3. 45 CFR 162.412 - Implementation specifications: Health plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 1 2011-10-01 2011-10-01 false Implementation specifications: Health plans. 162.412 Section 162.412 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES ADMINISTRATIVE DATA STANDARDS AND RELATED REQUIREMENTS ADMINISTRATIVE REQUIREMENTS Standard Unique Health Identifier for...

  4. 45 CFR 162.412 - Implementation specifications: Health plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 1 2012-10-01 2012-10-01 false Implementation specifications: Health plans. 162.412 Section 162.412 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES ADMINISTRATIVE DATA STANDARDS AND RELATED REQUIREMENTS ADMINISTRATIVE REQUIREMENTS Standard Unique Health Identifier for...

  5. 45 CFR 162.412 - Implementation specifications: Health plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 1 2013-10-01 2013-10-01 false Implementation specifications: Health plans. 162.412 Section 162.412 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES ADMINISTRATIVE DATA STANDARDS AND RELATED REQUIREMENTS ADMINISTRATIVE REQUIREMENTS Standard Unique Health Identifier for...

  6. Guide of Ideas for Planning and Implementing Intergenerational Projects

    ERIC Educational Resources Information Center

    Pinto, Teresa Almeida; Marreel, Iris; Hatton-Yeo, Alan

    2009-01-01

    "Guide of Ideas for Planning and Implementing Intergenerational Projects," is for all professionals that are or wish to be enrolled in the development of intergenerational activities. This "Guide" is the main product of the Project MATES--Mainstreaming Intergenerational Solidarity, co-financed by the Lifelong Learning Programme from the…

  7. 30 CFR 46.4 - Training plan implementation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Training plan implementation. 46.4 Section 46.4 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR EDUCATION AND TRAINING TRAINING AND RETRAINING OF MINERS ENGAGED IN SHELL DREDGING OR EMPLOYED AT SAND, GRAVEL, SURFACE...

  8. 30 CFR 46.4 - Training plan implementation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Training plan implementation. 46.4 Section 46.4 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR EDUCATION AND TRAINING TRAINING AND RETRAINING OF MINERS ENGAGED IN SHELL DREDGING OR EMPLOYED AT SAND, GRAVEL, SURFACE...

  9. 49 CFR 236.1011 - PTC Implementation Plan content requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... technology embedded in PTC systems that does not employ all of the functionalities required by this subpart... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1011 PTC Implementation Plan content requirements. (a) Contents....

  10. 49 CFR 236.1011 - PTC Implementation Plan content requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... technology embedded in PTC systems that does not employ all of the functionalities required by this subpart... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1011 PTC Implementation Plan content requirements. (a) Contents....

  11. TTIP: Texas Teacher Internship Program 1994 Curriculum Implementation Plans.

    ERIC Educational Resources Information Center

    Walenta, Brian T., Ed.

    The Texas Teacher Internship Program (TTIP) is a competitive program for science, technology and mathematics teachers who serve as summer interns at industry and university sites in order to experience real world applications of the subjects they teach. This document contains curriculum implementation plans developed by the teachers to illustrate…

  12. TTIP: Texas Teacher Internship Program: 1995 Curriculum Implementation Plans.

    ERIC Educational Resources Information Center

    Walenta, Brian T., Ed.

    In 1989 the Texas Alliance for Science, Technology and Mathematics Education began placing teachers of all levels at industry sites as part of its Texas Teacher Internship Program. In 1995, 15 teachers interned at 11 sites. Each teacher was required to develop a curriculum implementation plan which was to illustrate how they would translate the…

  13. 40 CFR 85.1804 - Approval of Plan: Implementation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 19 2012-07-01 2012-07-01 false Approval of Plan: Implementation. 85.1804 Section 85.1804 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM MOBILE SOURCES Recall Regulations § 85.1804 Approval of...

  14. 40 CFR 92.706 - Approval of plan: Implementation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Approval of plan: Implementation. 92.706 Section 92.706 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM LOCOMOTIVES AND LOCOMOTIVE ENGINES Recall Regulations §...

  15. 40 CFR 85.1804 - Approval of Plan: Implementation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 18 2010-07-01 2010-07-01 false Approval of Plan: Implementation. 85.1804 Section 85.1804 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM MOBILE SOURCES Recall Regulations § 85.1804 Approval of...

  16. 40 CFR 85.1804 - Approval of Plan: Implementation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 19 2013-07-01 2013-07-01 false Approval of Plan: Implementation. 85.1804 Section 85.1804 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM MOBILE SOURCES Recall Regulations § 85.1804 Approval of...

  17. 40 CFR 92.706 - Approval of plan: Implementation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 20 2011-07-01 2011-07-01 false Approval of plan: Implementation. 92.706 Section 92.706 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM LOCOMOTIVES AND LOCOMOTIVE ENGINES Recall Regulations §...

  18. 40 CFR 92.706 - Approval of plan: Implementation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 21 2012-07-01 2012-07-01 false Approval of plan: Implementation. 92.706 Section 92.706 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM LOCOMOTIVES AND LOCOMOTIVE ENGINES Recall Regulations §...

  19. 40 CFR 92.706 - Approval of plan: Implementation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 20 2014-07-01 2013-07-01 true Approval of plan: Implementation. 92.706 Section 92.706 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM LOCOMOTIVES AND LOCOMOTIVE ENGINES Recall Regulations §...

  20. 40 CFR 85.1804 - Approval of Plan: Implementation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 18 2011-07-01 2011-07-01 false Approval of Plan: Implementation. 85.1804 Section 85.1804 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM MOBILE SOURCES Recall Regulations § 85.1804 Approval of...

  1. 40 CFR 92.706 - Approval of plan: Implementation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 21 2013-07-01 2013-07-01 false Approval of plan: Implementation. 92.706 Section 92.706 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM LOCOMOTIVES AND LOCOMOTIVE ENGINES Recall Regulations §...

  2. The Common Core: Are State Implementation Plans Enough?

    ERIC Educational Resources Information Center

    Best, Jane; Cohen, Courtney

    2013-01-01

    This policy brief outlines the Common Core implementation plans for 15 states, including the professional development and resources/tools--such as instructional materials, toolkits, frameworks, crosswalks, and curriculum guides--that each state is providing. The authors suggest that supplemental resources like McREL's Common Core…

  3. Issues in Planning and Implementing National Literacy Programmes.

    ERIC Educational Resources Information Center

    Carron, G., Ed.; Bordia, A., Ed.

    The following papers were produced by participants and resource persons on specific issues of planning, management and implementation of literacy and post-literacy strategies: "People's Participation and Mobilization: Characteristics of the Literacy Campaigns in China" (Yanwei); "Strategies for Mobilization and Participation of Volunteers in…

  4. 40 CFR 49.11016 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Contents of implementation plan. 49.11016 Section 49.11016 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER... for agriculture burning permits. (j) Section 49.134Rule for forestry and silvicultural burning...

  5. 40 CFR 49.11016 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contents of implementation plan. 49.11016 Section 49.11016 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER... agriculture burning permits. (j) Section 49.134Rule for forestry and silvicultural burning permits....

  6. 40 CFR 49.11016 - Contents of implementation plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Contents of implementation plan. 49.11016 Section 49.11016 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER... for agriculture burning permits. (j) Section 49.134Rule for forestry and silvicultural burning...

  7. 75 FR 45080 - Revisions to the California State Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-02

    ... Implementation Plan (SIP). These revisions concern oxides of nitrogen (NO X ) emissions from boilers, steam... Boilers, Steam Generators 12/17/09 05/17/10 and Process Heaters-- 0.75 to less than 2.0 MMbtu/hr. On June... from boilers, steam generators, process heaters and water heaters with a total rated heat input...

  8. 49 CFR 1560.109 - Aircraft Operator Implementation Plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... operator's security program as described in 49 CFR part 1544, subpart B, or 49 CFR part 1546, subpart B, as...) and must be handled and protected in accordance with 49 CFR part 1520. ... 49 Transportation 9 2010-10-01 2010-10-01 false Aircraft Operator Implementation Plan....

  9. 49 CFR 1560.109 - Aircraft Operator Implementation Plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... operator's security program as described in 49 CFR part 1544, subpart B, or 49 CFR part 1546, subpart B, as...) and must be handled and protected in accordance with 49 CFR part 1520. ... 49 Transportation 9 2014-10-01 2014-10-01 false Aircraft Operator Implementation Plan....

  10. 49 CFR 1560.109 - Aircraft Operator Implementation Plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... operator's security program as described in 49 CFR part 1544, subpart B, or 49 CFR part 1546, subpart B, as...) and must be handled and protected in accordance with 49 CFR part 1520. ... 49 Transportation 9 2012-10-01 2012-10-01 false Aircraft Operator Implementation Plan....

  11. 49 CFR 1560.109 - Aircraft Operator Implementation Plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... operator's security program as described in 49 CFR part 1544, subpart B, or 49 CFR part 1546, subpart B, as...) and must be handled and protected in accordance with 49 CFR part 1520. ... 49 Transportation 9 2011-10-01 2011-10-01 false Aircraft Operator Implementation Plan....

  12. 49 CFR 1560.109 - Aircraft Operator Implementation Plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... operator's security program as described in 49 CFR part 1544, subpart B, or 49 CFR part 1546, subpart B, as...) and must be handled and protected in accordance with 49 CFR part 1520. ... 49 Transportation 9 2013-10-01 2013-10-01 false Aircraft Operator Implementation Plan....

  13. 40 CFR 85.1804 - Approval of Plan: Implementation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 19 2014-07-01 2014-07-01 false Approval of Plan: Implementation. 85.1804 Section 85.1804 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM MOBILE SOURCES Recall Regulations § 85.1804 Approval of...

  14. High performance computing and communications: FY 1995 implementation plan

    SciTech Connect

    1994-04-01

    The High Performance Computing and Communications (HPCC) Program was formally established following passage of the High Performance Computing Act of 1991 signed on December 9, 1991. Ten federal agencies in collaboration with scientists and managers from US industry, universities, and laboratories have developed the HPCC Program to meet the challenges of advancing computing and associated communications technologies and practices. This plan provides a detailed description of the agencies` HPCC implementation plans for FY 1994 and FY 1995. This Implementation Plan contains three additional sections. Section 3 provides an overview of the HPCC Program definition and organization. Section 4 contains a breakdown of the five major components of the HPCC Program, with an emphasis on the overall directions and milestones planned for each one. Section 5 provides a detailed look at HPCC Program activities within each agency. Although the Department of Education is an official HPCC agency, its current funding and reporting of crosscut activities goes through the Committee on Education and Health Resources, not the HPCC Program. For this reason the Implementation Plan covers nine HPCC agencies.

  15. Discharge Planning in Acute Care Hospitals in Israel: Services Planned and Levels of Implementation and Adequacy

    ERIC Educational Resources Information Center

    Auslander, Gail K.; Soskolne, Varda; Stanger, Varda; Ben-Shahar, Ilana; Kaplan, Giora

    2008-01-01

    This study aimed to examine the implementation, adequacy, and outcomes of discharge planning. The authors carried out a prospective study of 1,426 adult patients discharged from 11 acute care hospitals in Israel. Social workers provided detailed discharge plans on each patient. Telephone interviews were conducted two weeks post-discharge. Findings…

  16. EG and G Idaho Environmental Protection Implementation Plan (1990)

    SciTech Connect

    Wickham, L.E.

    1990-11-01

    This report describes the EG G Idaho strategy for implementation of the Department of Energy (DOE) Order 5400.1 (a DOE-Headquarters directive establishing environmental protection program requirements, authorities, and responsibilities). Preparation of this Environmental Protection Implementation Plan is a requirement of DOE Order 5400.1. Additionally, this report is intended to supplement the Department of Energy--Idaho Operations Office (DOE-ID) Environmental Protection Implementation Plan by detailing EG G Idaho Environmental Protection Program activities. This report describes the current status of the EG G Idaho program, and the strategies for enhancing, as necessary, the current program to meet the requirements of DOE Order 5400.1. Aspects of the Environmental Protection Program included in this report are the assignment of responsibilities to specific EG G organizations, a schedule for completion of enhancements, if necessary, and requirements for documentation and reporting. 4 figs., 1 tab.

  17. FY 95 engineering work plan for the design reconstitution implementation action plan

    SciTech Connect

    Bigbee, J.D.

    1994-11-09

    Design reconstitution work is to be performed as part of an overall effort to upgrade Configuration Management (CM) at TWRS. WHC policy is to implement a program that is compliant with DOE-STD-1073-93, Guide for Operational Configuration Management Program. DOE-STD-1073 requires an adjunct program for reconstituting design information. WHC-SD-WM-CM-009, Design Reconstitution Program Plan for Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System, is the TWRS plan for meeting DOE-STD-1073 design reconstitution requirements. The design reconstitution plan is complex requiring significant time and effort for implementation. In order to control costs, and integrate the work into other TWRS activities, a Design Reconstitution Implementation Action Plan (DR IAP) will be developed, and approved by those organizations having ownership or functional interest in this activity.

  18. The Best Laid Plans: An Examination of School Plan Quality and Implementation in a School Improvement Initiative

    ERIC Educational Resources Information Center

    Strunk, Katharine O.; Marsh, Julie A.; Bush-Mecenas, Susan C.; Duque, Matthew R.

    2016-01-01

    Purpose: A common strategy used in school improvement efforts is a mandated process of formal planning, yet little is known about the quality of plans or the relationship between plan quality and implementation. This mixed-methods article investigates plan quality, factors associated with plan quality, and the relationship between plan quality and…

  19. Planning and implementation of nonformal education projects in rural Thailand

    NASA Astrophysics Data System (ADS)

    Hugkuntod, Ubon; Tips, Walter E. J.

    1987-03-01

    This is a study of the factors that cause success and failure of implementation of rural nonformal education projects. The research indicates that late release of funds, the lack of a consistent plan, the lack of understanding of the roles and duties of staff, and conflicts between staff are the major problems in implementing nonformal education projects. Moreover, the successful achievement of nonformal education projects depends on co-ordination among organizations concerned, in matters of target groups, times of project implementation, and budgets. In addition, implementation should emphasize people's participation in project identification. The following changes are needed for more effective co-ordination: two-way communication in a horizontal line, the development of a workable administrative system and of similar attitudes and perceptions of staff in all organizations. In addition to these factors, staff experience is also important for successful co-ordination.

  20. Oil program implementation plan FY 1996--2000

    SciTech Connect

    1995-04-01

    This document reaffirms the US Department of Energy (DOE) Office of Fossil Energy commitment to implement the National Oil Research Program in a way to maximize assurance of energy security, economic growth, environmental protection, jobs, improved economic competitiveness, and improved US balance of trade. There are two sections and an appendix in this document. Section 1 is background information that guided its formulation and a summary of the Oil Program Implementation Plan. This summary includes mission statements, major program drivers, oil issues and trends, budget issues, customers/stakeholders, technology transfer, measures of program effectiveness, and benefits. Section 2 contains more detailed program descriptions for the eight technical areas and the NIPER infrastructure. The eight technical areas are reservoir characterization; extraction research; exploration, drilling, and risk-based decision management; analysis and planning; technology transfer; field demonstration projects; oil downstream operations; and environmental research. Each description contains an overview of the program, descriptions on main areas, a discussion of stakeholders, impacts, planned budget projections, projected schedules with Gantt charts, and measures of effectiveness. The appendix is a summary of comments from industry on an earlier draft of the plan. Although changes were made in response to the comments, many of the suggestions will be used as guidance for the FY 1997--2001 plan.

  1. 75 FR 21197 - Approval and Promulgation of Implementation Plans; Implementation Plan Revision; State of New Jersey

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-23

    ... (see 74 FR 2945, January 16, 2009), which will result in additional emission reductions of NO X and... any major non-CTG sources. Section IV.G of EPA's Phase 2 implementation rule (70 FR 71612, November 29... analysis and agreed with the State's conclusions. On May 15, 2009 (74 FR 22837) EPA conditionally...

  2. 75 FR 9373 - Approval and Promulgation of Implementation Plans; New York State Implementation Plan Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-02

    ... outdoors, and individuals with a pre-existing respiratory disease, such as asthma. On April 30, 2004 (69 FR... Poughkeepsie nonattainment area is composed of Dutchess, Orange and Putnam counties. On March 25, 2008 (73 FR... implementation rule, published on April 30, 2004 (69 FR 23951) and referred to as the Phase 1 Rule,...

  3. Liquid effluent Sampling and Analysis Plan (SAP) implementation summary report

    SciTech Connect

    Lueck, K.J.

    1995-04-26

    This report summarizes liquid effluent analytical data collected during the Sampling and Analysis Plan (SAP) Implementation Program, evaluates whether or not the sampling performed meets the requirements of the individual SAPs, compares the results to the WAC 173-200 Ground Water Quality Standards. Presented in the report are results from liquid effluent samples collected (1992-1994) from 18 of the 22 streams identified in the Consent Order (No. DE 91NM-177) requiring SAPs.

  4. 12 CFR 192.500. - What management stock benefit plans may I implement?

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 12 Banks and Banking 1 2013-01-01 2013-01-01 false What management stock benefit plans may I... management stock benefit plans may I implement? (a) During the 12 months after your conversion, you may implement a stock option plan (Option Plan), an employee stock ownership plan or other...

  5. Westinghouse Hanford Company quality assurance program and implementation plan

    SciTech Connect

    Moss, S.S., Westinghouse Hanford

    1996-07-01

    This is the first revision of the Quality AssurancePlan/Implementation Plan (QAP/IP) for nuclear facilities managedand operated by the Westinghouse Hanford Company (WHC).Development of the initial IP required review of the WHC qualityassurance program to the requirements of the 10 CFR 830.120, andcompletion of initial baseline assessments against the QAP toverify implementation of the program. Each WHC-managed nuclearfacility provided a stand-alone section to the QAP/IP, describingits mission and life-cycle status. WHC support organizationsalso performed assessments for their lead areas, and providedinputs to a separate stand-alone section with the initialbaseline assessment results. In this first revision, the initialbaseline matrixes for those facilities found to be in compliancewith the QAP have been removed. Tank Waste Remediation System(TWRS) and K Basins have modified their baseline matrixes to showcompletion of action items to date. With the followingexceptions, the WHC-managed nuclear facilities and their supportorganizations were found to have implemented QA programs thatsatisfy the requirements of 10 CFR 830.120. TWRS identifiedImplementation Plan Action Items having to do with: generationand revision of as-built drawings; updating TWRS organizationaland program documents; tracking the condition/age ofmaterials/equipment; and reconstitution of design bases forexisting, active facilities. No incremental funding needs wereidentified for FY95. For FY97, TWRS identified incrementalfunding in the amount of $65,000 for as-built drawings, and$100,000 for tracking the age/condition of materials/equipment.The K Basin Fuel Storage Facility identified Implementation PlanAction Items having to do with: training; updating procedures;establishing configuration management; reconstituting designbases; and providing darwings; and developing integrated,resource-loaded schedules. Incremental funding needs in theamount of $1.7 million were identified, over a time

  6. Self-assessment program implementation plan. Revision A

    SciTech Connect

    Quets, A.L.

    1991-10-23

    This implementation plan identifies and describes the tasks that must be completed in order to successfully implement a Self-Assessment (SA) Program. The purpose of the Self-Assessment Program is to comply with applicable Department of Energy (DOE) directives and orders, Federal, State, and local regulations, operate the Pinellas Plant according to best management practices, and achieve excellence in all operating areas. The Self-Assessment Program will be applied to the Pinellas Plant facility which includes buildings, grounds, equipment, operations, and activities under the control of line management. Furthermore, all applicable disciplines under environmental protection, safety, health and management will be covered by the program. The Self-Assessment Program has been designed to accomplish the following tasks: define the scope of the Self-Assessment Program; assign organizational roles and responsibilities; address EH and S functional elements and management issues; develop a Self-Assessment program charter and policy; identify all applicable EH and S codes, regulations and standards; develop self-assessment procedures and instructions; generate a Self-Assessment Manual; develop a master schedule for facility appraisals and audits; design checklists and report formats for recording appraisal data; implement an assessment tracking and reporting system; implement a root cause analysis and corrective action system; implement a trend analysis and lessons learned system; and establish a formal training program.

  7. Guideline adaptation and implementation planning: a prospective observational study

    PubMed Central

    2013-01-01

    Background Adaptation of high-quality practice guidelines for local use has been advanced as an efficient means to improve acceptability and applicability of evidence-informed care. In a pan-Canadian study, we examined how cancer care groups adapted pre-existing guidelines to their unique context and began implementation planning. Methods Using a mixed-methods, case-study design, five cases were purposefully sampled from self-identified groups and followed as they used a structured method and resources for guideline adaptation. Cases received the ADAPTE Collaboration toolkit, facilitation, methodological and logistical support, resources and assistance as required. Documentary and primary data collection methods captured individual case experience, including monthly summaries of meeting and field notes, email/telephone correspondence, and project records. Site visits, process audits, interviews, and a final evaluation forum with all cases contributed to a comprehensive account of participant experience. Results Study cases took 12 to >24 months to complete guideline adaptation. Although participants appreciated the structure, most found the ADAPTE method complex and lacking practical aspects. They needed assistance establishing individual guideline mandate and infrastructure, articulating health questions, executing search strategies, appraising evidence, and achieving consensus. Facilitation was described as a multi-faceted process, a team effort, and an essential ingredient for guideline adaptation. While front-line care providers implicitly identified implementation issues during adaptation, they identified a need to add an explicit implementation planning component. Conclusions Guideline adaptation is a positive initial step toward evidence-informed care, but adaptation (vs. ‘de novo’ development) did not meet expectations for reducing time or resource commitments. Undertaking adaptation is as much about the process (engagement and capacity building) as it

  8. 78 FR 59242 - Approval and Promulgation of Air Quality Implementation Plans; Utah; Maintenance Plan for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-26

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Utah; Maintenance...: Degreasing and Solvent Cleaning Operations;'' R307- 340, ``Ozone Nonattainment and Maintenance Areas: Surface... 110 of the Clean Air Act (Act or CAA). DATES: This action is effective on October 28, 2013....

  9. 78 FR 69998 - Approval and Promulgation of Air Quality Implementation Plans; Rescission of Federal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-22

    ... Federal Implementation Plan; Wyoming; Prevention of Significant Deterioration; Greenhouse Gas Tailoring... of greenhouse gases (GHGs). Specifically, we are approving revisions to Wyoming's Air Quality..., Section 7, Greenhouse Gases. EPA is also rescinding the GHG PSD Federal Implementation Plan (FIP)...

  10. 78 FR 11809 - Approval and Promulgation of Implementation Plans; State of Missouri; Restriction of Emission of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-20

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; State of Missouri; Restriction of Emission of Particulate Matter From Industrial Processes AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA proposes to approve the State Implementation Plan...

  11. NESD CAE facility minimal implementation plan (June 1982)

    SciTech Connect

    Ames, H. S.

    1983-08-04

    In conjunction with other divisions in the EE Department, the Nuclear Energy Systems Division is developing a Computer-Aided Engineering (CAE) capability. Some of our needs in areas such as drafting, PC design, and IC design can be satisfied with existing turnkey systems. Many of our other needs, including modeling, analysis, document management and communication, software development, project management, and project communication will require the gradual development of an expanded computing environment. The purpose of this document is to describe our initial plans to implement a CAE facility.

  12. Implementing OPA 90 preparedness and response strategies planning

    SciTech Connect

    Pond, B.

    1994-08-01

    A slide presentation is given on the National Preparedness Response Exercise Program (PREP). PREP is designed to interpret and provide a consistent approach to the pollution response exercise requirements outlined in various federal regulations implementing the provisions of OPA90. PREP is designed as a voluntary, non-regulatory program, but compliance will fully satisfy all OPA mandated federal requirements for pollution response exercises, as well as the requirements of many coastal states. It is believed that the PREP program will be a critical part in enhancing national preparedness, improving contingency plans, and reinforcing OPA`s process of preparedness.

  13. GEWEX America Prediction Project (GAPP) Science and Implementation Plan

    NASA Technical Reports Server (NTRS)

    2004-01-01

    The purpose of this Science and Implementation Plan is to describe GAPP science objectives and the activities required to meet these objectives, both specifically for the near-term and more generally for the longer-term. The GEWEX Americas Prediction Project (GAPP) is part of the Global Energy and Water Cycle Experiment (GEWEX) initiative that is aimed at observing, understanding and modeling the hydrological cycle and energy fluxes at various time and spatial scales. The mission of GAPP is to demonstrate skill in predicting changes in water resources over intraseasonal-to-interannual time scales, as an integral part of the climate system.

  14. Strategies and Exemplars for Public Outreach Events: Planning, Implementation, Evaluation

    NASA Astrophysics Data System (ADS)

    Cobb, W. H.; Buxner, S.; Shipp, S. S.; Shebby, S.

    2015-12-01

    IntroductionEach year the National Aeronautics and Space Administration (NASA) sponsors a variety of public outreach events to share information with educators, students, and the general public. These events are designed to increase interest in and awareness of the mission and goals of NASA. Planning and implementation best practices gleaned from the NASA SMD Education's review of large-scale events, "Best Practices in Outreach Events" will be shared. Outcomes from an event, i C Ceres, celebrating the Dawn mission's arrival at dwarf planet Ceres that utilized these strategies will be shared. Best practices included can be pertinent for all event organizers and evaluators regardless of event size. BackgroundThe literature review focused on identifying evaluations of large-scale public outreach events—and, within these evaluations, identifying best practices. The following criteria for identifying journal articles and reports to potentially include: Public, science-related events open to adults and children. Events with more than 1,000 attendees. Events that occurred during the last 5 years. Evaluations that included information on data collected from visitors and/or volunteers. Evaluations that specified the type of data collected, methodology, and associated results. Planning and Implementation Best PracticesThe literature review revealed key considerations for planning and of large-scale events implementing events. A summary of related best practices is presented below. 1) Advertise the event 2) Use and advertise access to scientists 3) Recruit scientists using these findings 4) Ensure that the event is group and particularly child friendly 5) Target specific event outcomes Best Practices Informing Real-world Planning, Implementation and EvaluationDawn mission's collaborative design of a series of events, i C Ceres, including in-person, interactive events geared to families and live presentations will be shared. Outcomes and lessons learned will be imparted

  15. Lawrence Berkeley Laboratory Self-Assessment Program: Implementation Plan

    SciTech Connect

    Not Available

    1992-06-01

    The Lawrence Berkeley Laboratory (LBL) Self-Assessment Program provides a formal process for assuring quality and regulatory compliance in all facets of Laboratory operations. The program, which integrates the ongoing self-assessment activities of the individual Divisions and Offices in a comprehensive, top-to-bottom process, provides assistance to the US Department of Energy (DOE), the University of California, and Laboratory management in their appraisals of Laboratory performance. This document describes the program goals, scope, responsibilities, elements, and implementation schedule. This document is also the implementation plan for the institutional level self-assessment program. Each Division is also required to develop a self-assessment program that contains the elements described in this document.

  16. A strategic approach for Water Safety Plans implementation in Portugal.

    PubMed

    Vieira, Jose M P

    2011-03-01

    Effective risk assessment and risk management approaches in public drinking water systems can benefit from a systematic process for hazards identification and effective management control based on the Water Safety Plan (WSP) concept. Good results from WSP development and implementation in a small number of Portuguese water utilities have shown that a more ambitious nationwide strategic approach to disseminate this methodology is needed. However, the establishment of strategic frameworks for systematic and organic scaling-up of WSP implementation at a national level requires major constraints to be overcome: lack of legislation and policies and the need for appropriate monitoring tools. This study presents a framework to inform future policy making by understanding the key constraints and needs related to institutional, organizational and research issues for WSP development and implementation in Portugal. This methodological contribution for WSP implementation can be replicated at a global scale. National health authorities and the Regulator may promote changes in legislation and policies. Independent global monitoring and benchmarking are adequate tools for measuring the progress over time and for comparing the performance of water utilities. Water utilities self-assessment must include performance improvement, operational monitoring and verification. Research and education and resources dissemination ensure knowledge acquisition and transfer.

  17. 76 FR 11963 - Updating Cross-References for the Oklahoma State Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-04

    ... Concerning Greenhouse Gas Emitting-Sources in State Implementation Plans'' (SIP Narrowing Rule) (75 FR 82536... Deterioration Provisions Concerning Greenhouse Gas Emitting-Sources in State Implementation Plans'' at 75 FR... Deterioration Provisions Concerning Greenhouse Gas Emitting-Sources in State Implementation Plans'' to...

  18. 40 CFR 49.9900 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.9900 Section 49.9900 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Confederated Tribes of the Chehalis Reservation, Washington §...

  19. 40 CFR 49.10530 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10530 Section 49.10530 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Puyallup Tribe of the Puyallup Reservation, Washington §...

  20. 40 CFR 49.10110 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10110 Section 49.10110 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Confederated Tribes of the Grand Ronde Community of Oregon §...

  1. 40 CFR 49.10830 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10830 Section 49.10830 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Spokane Tribe of the Spokane Reservation, Washington §...

  2. 40 CFR 49.10140 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10140 Section 49.10140 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Hoh Indian Tribe of the Hoh Indian Reservation, Washington §...

  3. 40 CFR 49.10710 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10710 Section 49.10710 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Shoshone-Bannock Tribes of the Fort Hall Indian Reservation of...

  4. 40 CFR 49.9960 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.9960 Section 49.9960 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Confederated Tribes of the Colville Reservation, Washington §...

  5. 40 CFR 49.9930 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.9930 Section 49.9930 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Coeur D'alene Tribe of the Coeur D'alene Reservation, Idaho §...

  6. 40 CFR 49.10320 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10320 Section 49.10320 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Lummi Tribe of the Lummi Reservation, Washington §...

  7. 40 CFR 49.10560 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10560 Section 49.10560 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Quileute Tribe of the Quileute Reservation, Washington §...

  8. 40 CFR 49.10260 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10260 Section 49.10260 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Kootenai Tribe of Idaho § 49.10260 Federally-promulgated...

  9. 40 CFR 49.10960 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10960 Section 49.10960 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Swinomish Indians of the Swinomish Reservation, Washington §...

  10. 40 CFR 49.10770 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10770 Section 49.10770 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Skokomish Indian Tribe of the Skokomish Reservation, Washington §...

  11. 40 CFR 49.10990 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10990 Section 49.10990 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Tulalip Tribes of the Tulalip Reservation, Washington §...

  12. 40 CFR 49.10410 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10410 Section 49.10410 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Nez Perce Tribe of Idaho § 49.10410...

  13. 40 CFR 49.10230 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10230 Section 49.10230 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Klamath Indian Tribe of Oregon § 49.10230...

  14. 40 CFR 49.10740 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10740 Section 49.10740 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Confederated Tribes of the Siletz Reservation, Oregon §...

  15. 40 CFR 49.10650 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10650 Section 49.10650 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Sauk-Suiattle Indian Tribe of Washington § 49.10650...

  16. 40 CFR 49.11050 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.11050 Section 49.11050 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Upper Skagit Indian Tribe of Washington § 49.11050...

  17. 40 CFR 49.10470 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10470 Section 49.10470 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Nooksack Indian Tribe of Washington § 49.10470...

  18. 40 CFR 49.10200 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10200 Section 49.10200 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Kalispel Indian Community of the Kalispel Reservation,...

  19. 40 CFR 49.10170 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10170 Section 49.10170 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Jamestown S'klallam Tribe of Washington § 49.10170...

  20. 40 CFR 49.10930 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10930 Section 49.10930 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Suquamish Indian Tribe of the Port Madison Reservation,...

  1. 40 CFR 49.10440 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10440 Section 49.10440 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Nisqually Indian Tribe of the Nisqually Reservation, Washington §...

  2. 40 CFR 49.10590 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10590 Section 49.10590 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Quinault Tribe of the Quinault Reservation, Washington §...

  3. 40 CFR 49.10680 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10680 Section 49.10680 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Shoalwater Bay Tribe of the Shoalwater Bay Indian...

  4. 40 CFR 49.10020 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10020 Section 49.10020 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Coquille Tribe of Oregon § 49.10020...

  5. 40 CFR 49.10380 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10380 Section 49.10380 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Muckleshoot Indian Tribe of the Muckleshoot Reservation,...

  6. 40 CFR 49.10500 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10500 Section 49.10500 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Port Gamble Indian Community of the Port Gamble...

  7. 40 CFR 49.10860 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10860 Section 49.10860 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Squaxin Island Tribe of the Squaxin Island Reservation,...

  8. 40 CFR 49.11110 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.11110 Section 49.11110 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Confederated Tribes and Bands of the Yakama Nation, Washington §...

  9. 40 CFR 49.10350 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10350 Section 49.10350 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Makah Indian Tribe of the Makah Indian Reservation, Washington §...

  10. 40 CFR 49.10890 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10890 Section 49.10890 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Stillaguamish Tribe of Washington § 49.10890...

  11. 40 CFR 49.11080 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.11080 Section 49.11080 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Confederated Tribes of the Warm Springs Reservation of Oregon §...

  12. 40 CFR 49.9990 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.9990 Section 49.9990 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Confederated Tribes of the Coos, Lower Umpqua and Siuslaw Indians...

  13. 40 CFR 49.10290 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10290 Section 49.10290 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Lower Elwha Tribal Community of the Lower Elwha...

  14. 40 CFR 49.10050 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal implementation plans. 49.10050 Section 49.10050 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Cow Creek Band of Umpqua Indians of Oregon § 49.10050...

  15. 40 CFR 52.2479 - Contents of the federally approved, State submitted implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., State submitted implementation plan. 52.2479 Section 52.2479 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Washington § 52.2479 Contents of the federally approved, State submitted implementation plan....

  16. 76 FR 40248 - Approval and Promulgation of Implementation Plans; Connecticut, Maine, New Hampshire and Rhode...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-08

    ... 80,186 (December 31, 2002), as amended by 72 FR 32,526 (June 13, 2007) (``NSR Reform''). In light of... Implementation Plan; Call for Utah State Implementation Plan Revision,'' 74 FR 21,639 (April 18, 2011). \\14\\ EPA... Concerning Greenhouse Gas Emitting-Sources in State Implementation Plans; Final Rule,'' 75 FR 82,536 (Dec....

  17. 76 FR 40258 - Approval and Promulgation of Implementation Plans; State of NE

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-08

    ... Substantial Inadequacy of Implementation Plan; Call for Utah State Implementation Plan Revision,'' 74 FR 21639... Provisions Concerning Greenhouse Gas Emitting-Sources in State Implementation Plans; Final Rule,'' 75 FR..., the U.S. House of Representatives, and the Comptroller General of the United States prior...

  18. 5 CFR 576.102 - Voluntary Separation Incentive Payment implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... implementation plan outlining the intended use of the incentive payments, or (2) The agency's human capital plan... organizational structure after the agency has completed the incentive payments. If the human capital plan...

  19. 5 CFR 576.102 - Voluntary Separation Incentive Payment implementation plans.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... implementation plan outlining the intended use of the incentive payments, or (2) The agency's human capital plan... organizational structure after the agency has completed the incentive payments. If the human capital plan...

  20. 5 CFR 576.102 - Voluntary Separation Incentive Payment implementation plans.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... implementation plan outlining the intended use of the incentive payments, or (2) The agency's human capital plan... organizational structure after the agency has completed the incentive payments. If the human capital plan...

  1. 5 CFR 576.102 - Voluntary Separation Incentive Payment implementation plans.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... implementation plan outlining the intended use of the incentive payments, or (2) The agency's human capital plan... organizational structure after the agency has completed the incentive payments. If the human capital plan...

  2. 5 CFR 576.102 - Voluntary Separation Incentive Payment implementation plans.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... implementation plan outlining the intended use of the incentive payments, or (2) The agency's human capital plan... organizational structure after the agency has completed the incentive payments. If the human capital plan...

  3. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  4. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  5. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  6. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  7. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  8. Partnerships for Policy Development: A Case Study From Uganda's Costed Implementation Plan for Family Planning.

    PubMed

    Lipsky, Alyson B; Gribble, James N; Cahaelen, Linda; Sharma, Suneeta

    2016-06-20

    In global health, partnerships between practitioners and policy makers facilitate stakeholders in jointly addressing those issues that require multiple perspectives for developing, implementing, and evaluating plans, strategies, and programs. For family planning, costed implementation plans (CIPs) are developed through a strategic government-led consultative process that results in a detailed plan for program activities and an estimate of the funding required to achieve an established set of goals. Since 2009, many countries have developed CIPs. Conventionally, the CIP approach has not been defined with partnerships as a focal point; nevertheless, cooperation between key stakeholders is vital to CIP development and execution. Uganda launched a CIP in November 2014, thus providing an opportunity to examine the process through a partnership lens. This article describes Uganda's CIP development process in detail, grounded in a framework for assessing partnerships, and provides the findings from 22 key informant interviews. Findings reveal strengths in Uganda's CIP development process, such as willingness to adapt and strong senior management support. However, the evaluation also highlighted challenges, including district health officers (DHOs), who are a key group of implementers, feeling excluded from the development process. There was also a lack of planning around long-term partnership practices that could help address anticipated execution challenges. The authors recommend that future CIP development efforts use a long-term partnership strategy that fosters accountability by encompassing both the short-term goal of developing the CIP and the longer-term goal of achieving the CIP objectives. Although this study focused on Uganda's CIP for family planning, its lessons have implications for any policy or strategy development efforts that require multiple stakeholders to ensure successful execution. PMID:27353621

  9. Partnerships for Policy Development: A Case Study From Uganda's Costed Implementation Plan for Family Planning.

    PubMed

    Lipsky, Alyson B; Gribble, James N; Cahaelen, Linda; Sharma, Suneeta

    2016-06-20

    In global health, partnerships between practitioners and policy makers facilitate stakeholders in jointly addressing those issues that require multiple perspectives for developing, implementing, and evaluating plans, strategies, and programs. For family planning, costed implementation plans (CIPs) are developed through a strategic government-led consultative process that results in a detailed plan for program activities and an estimate of the funding required to achieve an established set of goals. Since 2009, many countries have developed CIPs. Conventionally, the CIP approach has not been defined with partnerships as a focal point; nevertheless, cooperation between key stakeholders is vital to CIP development and execution. Uganda launched a CIP in November 2014, thus providing an opportunity to examine the process through a partnership lens. This article describes Uganda's CIP development process in detail, grounded in a framework for assessing partnerships, and provides the findings from 22 key informant interviews. Findings reveal strengths in Uganda's CIP development process, such as willingness to adapt and strong senior management support. However, the evaluation also highlighted challenges, including district health officers (DHOs), who are a key group of implementers, feeling excluded from the development process. There was also a lack of planning around long-term partnership practices that could help address anticipated execution challenges. The authors recommend that future CIP development efforts use a long-term partnership strategy that fosters accountability by encompassing both the short-term goal of developing the CIP and the longer-term goal of achieving the CIP objectives. Although this study focused on Uganda's CIP for family planning, its lessons have implications for any policy or strategy development efforts that require multiple stakeholders to ensure successful execution.

  10. Idaho National Laboratory Site Long-Term Stewardship Implementation Plan

    SciTech Connect

    B. E. Olaveson

    2006-07-27

    The U.S. Department of Energy has established long-term stewardship programs to protect human health and the environment at sites where residual contamination remains after site cleanup. At the Idaho National Laboratory Site, Comprehensive Environmental Response, Compensation, and Liability Act (CERLA) long-term stewardship activities performed under the aegis of regulatory agreements, the Federal Facility Agreement and Consent Order for the Idaho National Laboratory, and state and federal requirements are administered primarily under the direction of the Idaho Cleanup Project. It represents a subset of all on-going environmental activity at the Idaho National Laboratory Site. This plan provides a listing of applicable CERCLA long-term stewardship requirements and their planned and completed implementation goals. It proffers the Long-Term Stewardship Environmental Data Warehouse for Sitewide management of environmental data. This plan will be updated as needed over time, based on input from the U.S. Department of Energy, its cognizant subcontractors, and other local and regional stakeholders.

  11. Waste sampling and characterization facility (WSCF) maintenance implementation plan

    SciTech Connect

    Heinemann, J.L.

    1997-08-13

    This Maintenance Implementation Plan (MIP) is written to satisfy the requirements of the US Department of Energy (DOE) Order 4330.4B, Maintenance Management Program that specifies the general policy and objectives for the establishment of the DOE controlled maintenance programs. These programs provide for the management and performance of cost effective maintenance and repair of the DOE property, which includes facilities. This document outlines maintenance activities associated with the facilities operated by Waste Management Hanford, Inc. (WMH). The objective of this MIP is to provide baseline information for the control and execution of WMH Facility Maintenance activities relative to the requirements of Order 4330.4B, assessment of the WMH maintenance programs, and actions necessary to maintain compliance with the Order. Section 2.0 summarizes the history, mission and description of the WMH facilities. Section 3.0 describes maintenance scope and requirements, and outlines the overall strategy for implementing the maintenance program. Specific elements of DOE Order 4330.4B are addressed in Section 4.0, listing the objective of each element, a discussion of the WMH compliance methodology, and current implementation requirements with references to WMH and HNF policies and procedures. Section 5.0 addresses deviations from policy requirements, and Section 6.0 is a schedule for specific improvements in support of this MIP.

  12. Transportation control measure: State Implementation Plan guidance (revised final report)

    SciTech Connect

    Eisinger, D.S.; Deakin, E.A.; Mahoney, L.A.; Morris, R.E.; Ireson, R.G.

    1990-09-01

    The document has been developed for the United States Environmental Protection Agency to summarize current knowledge about transportation control measures (TCMs). The target audience includes transportation and air quality management staff at all government levels. The guidance development effort is motivated by the need to provide post-1987 guidance to attain National Ambient Air Quality Standards (NAAQS). The document provides descriptions and examples of the most frequently implemented TCMs; institutional guidance such as assessing feasibility, agency responsibilities, and funding; and techniques for monitoring and enforcing TCMs. In addition, the document describes the tools available for evaluating TCM impacts on hydrocarbons, nitrogen oxides, and carbon monoxide emissions. Appendices present approaches to estimate TCM effects on PM-10 emissions; important sources of additional information; implementation experiences in various cities; and rules of thumb to quantitatively evaluate TCM transportation system effects. The information presented demonstrates that there have been significant advances in TCM development over the past decade, and that TCMs are appropriate control options for state implementation plans.

  13. Maintenance implementation plan for the Fast Flux Test Facility

    SciTech Connect

    Boyd, J.A.

    1997-01-30

    This plan implements the U.S. Department of Energy (DOE) 4330.4B, Maintenance Management Program (1994), at the Fast Flux Test Facility (FFTF). The FFTF is a research and test reactor located near Richland, Washington, and is operated under contract for the DOE by the B&W Hanford Company (BWHC). The intent of this Maintenance Implementation Plan (MIP) is to describe the manner in which the activities of the maintenance function are executed and controlled at the FFTF and how this compares to the requirements of DOE 4330.4B. The MIP ii a living document that is updated through a Facility Maintenance Self- Assessment Program. During the continuing self-assessment program, any discrepancies found are resolved to meet DOE 4330.4B requirements and existing practices. The philosophy of maintenance management at the FFTF is also describe within this MIP. This MIP has been developed based on information obtained from various sources including the following: * A continuing self-assessment against the requirements of the Conduct of Maintenance Order * In-depth reviews conducted by the members of the task team that assembled this MIP * Inputs from routine audits and appraisals conducted at the facility The information from these sources is used to identify those areas in which improvements could be made in the manner in which the facility conducts maintenance activities. The action items identified in Rev. 1 of the MIP have been completed. The MIP is arranged in six sections. Section I is this Executive Summary. Section 2 describes the facility and its 0683 history. Section 3 describes the philosophy of the graded approach and how it is applied at FFTF. Section 3 also discusses the strategy and the basis for the prioritizing resources. Section 4 contains the detailed discussion of `the elements of DOE 4330.4B and their state of implementation. Section 5 is for waivers and requested deviations from the requirements of the order. Section 6 contains a copy of the Maintenance

  14. Urban Educational Planning and the Problems of Implementation

    ERIC Educational Resources Information Center

    Rieder, Corinne; Davidow, Harry

    1970-01-01

    The essay analyzes the demands and constraints on the planning process, discusses new efforts by the Educational Planning Section of the New York City Planning Department to fill the gaps in Planning, and suggests guidelines and criteria for its own future planning and for that of planning agencies in other large cities." (Author)

  15. Implementing the retrofitting plan for the European rail freight fleet

    NASA Astrophysics Data System (ADS)

    de Vos, P. H.; Bergendorff, M.; Brennan, M.; van der Zijpp, F.

    2006-06-01

    In 1998, the International Union of Railways (UIC) agreed on an Action Plan, proposing the retrofitting of the complete European rail freight fleet. Early 2003 the European Commission, Directorate General for Transport and Energy, commissioned the study reported here. The scope of the study was to supply an independent assessment of the conclusions of the UIC Action Plan and elaborate on implementation scenarios and funding options. The retrofitting of existing wagons, by an exchange of cast iron brake blocks with composition blocks, is the preferred option to achieve a substantial noise reduction. K-blocks have been homologated by UIC in 2003, but they require an expensive modification of the wagon. The opportunities for LL-blocks, an economically attractive alternative, are still being investigated to date. The retrofitting reflects some 600,000 wagons and, with an expected reduction of 10 dB(A), probably represents the largest single operation for traffic noise reduction ever. The process could best be combined with the maintenance cycle of freight wagons. In that case the process would require up to 10 years. Through a combination of funding options, the financial burden for wagons owners and freight operators could be softened.

  16. Project Hanford Management Contract (PHMC) pollution prevention program implementation plan

    SciTech Connect

    Place, B.G., Westinghouse Hanford

    1996-12-31

    This plan documents the Project Hanford Management Contract (PHMC) Pollution Prevention/Waste Minimization (P2/WMin) Program. The subject implementation plan has been updated to reflect the Fiscal Year (FY) 1997 contract structure in which Fluor Daniel Hanford, Inc. (FDH) is the management and integration contractor. The P2/WMin Program scope includes FDH as the principal PHMC contractor, and B&W Hanford Company (BWHC), Duke Engineering & Services Hanford, Inc. (DESH), Lockheed Martin Hanford Corporation, (LMHC), Numatec Hanford Corporation (NHC), Rust Federal Services of Hanford, Inc. (RFSH), and DynCorp Tri-Cities Services, Inc. (DYN) as PHMC contractors, as well as subcontracting enterprise companies, such as Fluor Daniel Northwest, Inc. (FDNW), Lockheed Martin Services, Inc. (LMSI), and Rust Federal Services Northwest (RFS), which provide engineering, operation, construction, maintenance, and computer services for the Hanford Site. The P2/WMin Program scope also includes all other subcontractor-affiliated enterprise companies, such as B&W Protec, Inc. (BWP), DE&S Northwest, Inc. (DESNW), and SGN Eurisys Services Corp. (SESC).

  17. Y-12 Site environmental protection program implementation plan (EPPIP)

    SciTech Connect

    1996-11-01

    The Y-12 Plant Environmental Protection Program is conducted to: (1) protect public health and the environment from chemical and radiological releases occurring from current plant operations and past waste management and operational practices; (2) ensure compliance with federal, state, and local environmental regulations and DOE directives; (3) identify potential environmental problems; (4) evaluate existing environmental contamination and determine the need for remedial actions and mitigative measures; (5) monitor the progress of ongoing remedial actions and cleanup measures; and (6) inform the public of environmental issues relating to DOE operations. DOE Order 5400.1, General Environmental Protection Program, defines the general requirements for environmental protection programs at DOE facilities. This Environmental Protection Program Implementation Plan (EPPIP) defines the methods by which the Y-12 Plant staff will comply with the order by: (1) referencing environmental protection goals and objectives and identifying strategies and timetables for attaining them; (2) providing the overall framework for the design and implementation of the Y-12 Environmental Protection Program; and (3) assigning responsibilities for complying with the requirements of the order. The EPPIP is revised and updated annually.

  18. 77 FR 64734 - Approval and Promulgation of Implementation Plans; North Dakota: Prevention of Significant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-23

    ... Concerning Greenhouse Gas Emitting-Sources in State Implementation Plans; Final Rule.'' 75 FR 82536 (December... Plan Revisions Required for Greenhouse Gases,'' 75 FR 81874 (December 29, 2010); ``Action To Ensure... Greenhouse Gas Emissions: Federal Implementation Plan,'' 75 FR 82246 (December 30, 2010). Because...

  19. 76 FR 43963 - Regional Haze State Implementation Plan; State of Nevada; Extension of Comment Period

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-22

    ... plan. DATES: The comment period for the proposed rule published June 22, 2011 (76 FR 36450), is... AGENCY 40 CFR Part 51 Regional Haze State Implementation Plan; State of Nevada; Extension of Comment... (SIP) to implement the regional haze program for the first planning period through July 31, 2018....

  20. 40 CFR 49.10410 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Federally-promulgated regulations and Federal implementation plans. 49.10410 Section 49.10410 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes-Region...

  1. 40 CFR 49.10410 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Federally-promulgated regulations and Federal implementation plans. 49.10410 Section 49.10410 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes-Region...

  2. 76 FR 41075 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; Indiana; Michigan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-13

    ...,'' 67 FR 80186 (December 31, 2002), as amended by 72 FR 32526 (June 13, 2007) (``NSR Reform''). In light... Plan; Call for Utah State Implementation Plan Revision,'' 74 FR 21639 (April 18, 2011). \\13\\ EPA has... Greenhouse Gas Emitting-Sources in State Implementation Plans; Final Rule,'' 75 FR 82,536 (December 30,...

  3. Bandwith Implementation Plan, 2004-05: Learning in an Online World

    ERIC Educational Resources Information Center

    Ministerial Council on Education, Employment, Training and Youth Affairs (NJ1), 2004

    2004-01-01

    The July 2003 meeting of the Ministerial Council for Education, Employment Training and Youth Affairs (MCEETYA) endorsed the "National Bandwidth Action Plan--Learning in an online world 2003-06" as the basis for the development of the "National Implementation Plan." The "National Implementation Plan 2004-05" provides the detail critical to…

  4. 76 FR 12945 - Instructions for Implementing Climate Change Adaptation Planning in Accordance With Executive...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-09

    ... expected to implement them as part of their compliance with E.O. 13514. Authority: E.O. 13514, 74 FR 52117... QUALITY Instructions for Implementing Climate Change Adaptation Planning in Accordance With Executive... Adaptation Planning Implementing Instructions. SUMMARY: The Chair of the Council on Environmental...

  5. 76 FR 31242 - Revisions to the California State Implementation Plan, Santa Barbara County Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-31

    ... Environmental protection, Air pollution control, Incorporation by reference, Intergovernmental relations... Identification of plan. * * * * * (c) * * * (359) * * * (i) * * * (E) Santa Barbara County Air Pollution Control... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Santa Barbara County...

  6. 78 FR 48638 - Approval and Promulgation of State Implementation Plans: Alaska; Fairbanks Carbon Monoxide...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-09

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Approval and Promulgation of State Implementation Plans: Alaska; Fairbanks Carbon Monoxide Limited Maintenance Plan AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed...

  7. 75 FR 21197 - Approval and Promulgation of Air Quality Implementation Plans; New Mexico; Revisions to New...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-23

    ...; Revisions to New Mexico Transportation Conformity Regulations AGENCY: Environmental Protection Agency (EPA... Implementation Plan (SIP) concerning the State transportation conformity rules. The plan revisions are intended to ensure consistency with amendments to the Federal Transportation Conformity Rule. These...

  8. 40 CFR 52.1079 - Requirements for state implementation plan revisions relating to new motor vehicles.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... PLANS (CONTINUED) Maryland § 52.1079 Requirements for state implementation plan revisions relating to new motor vehicles. Maryland must comply with the requirements of § 51.120. Effective Date Note: At...

  9. 78 FR 68997 - Approval and Promulgation of Implementation Plans; Florida; Approval of Revision to the State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-18

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION... the State Implementation Plan AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule... Section, Air Planning Branch, Air, Pesticides and Toxics Management Division, U.S....

  10. 76 FR 52917 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Adoption of Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-24

    ...; Adoption of Control Techniques Guidelines for Large Appliance and Metal Furniture Coatings AGENCY... same title, ``Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Adoption...

  11. 77 FR 6529 - Approval and Promulgation of Implementation Plans; Alabama, Georgia, and Tennessee: Chattanooga...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-08

    ...: Chattanooga; Particulate Matter 2002 Base Year Emissions Inventory AGENCY: Environmental Protection Agency... ) 2002 base year emissions inventory portion of the State Implementation Plan (SIP) revision submitted...

  12. Weatherization and Intergovernmental Program - State Energy Program Helps States Plan and Implement Energy Efficiency

    SciTech Connect

    2010-06-01

    State energy offices use SEP funds to develop state plans that identify opportunities for adopting renewable energy and energy efficiency technologies, and implementing programs to improve energy sustainability.

  13. 77 FR 52630 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Volatile Organic...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-30

    ... Organic Compounds; Architectural and Industrial Maintenance Coatings AGENCY: Environmental Protection... Implementation Plan (SIP) the addition of a new rule that sets emissions limits on the amount of volatile...

  14. Maintenance implementation plan for the Plutonium Finishing Plant. Revision 3

    SciTech Connect

    Meldrom, C.A.

    1996-03-01

    This document outlines the Maintenance Implementation Plan (MIP) for the Plutonium Finishing Plant (PFP) located at the Hanford site at Richland, Washington. This MIP describes the PFP maintenance program relative to DOE order 4330.4B. The MIP defines the key actions needed to meet the guidelines of the Order to produce a cost-effective and efficient maintenance program. A previous report identified the presence of significant quantities of Pu-bearing materials within PFP that pose risks to workers. PFP`s current mission is to develop, install and operate processes which will mitigate these risks. The PFP Maintenance strategy is to equip the facility with systems and equipment able to sustain scheduled PFP operations. The current operating run is scheduled to last seven years. Activities following the stabilization operation will involve an Environmental Impact Statement (EIS) to determine future plant activities. This strategy includes long-term maintenance of the facility for safe occupancy and material storage. The PFP maintenance staff used the graded approach to dictate the priorities of the improvement and upgrade actions identified in Chapter 2 of this document. The MIP documents PFP compliance to the DOE 4330.4B Order. Chapter 2 of the MIP follows the format of the Order in addressing the eighteen elements. As this revision is a total rewrite, no sidebars are included to highlight changes.

  15. Implementation of an interactive liver surgery planning system

    NASA Astrophysics Data System (ADS)

    Wang, Luyao; Liu, Jingjing; Yuan, Rong; Gu, Shuguo; Yu, Long; Li, Zhitao; Li, Yanzhao; Li, Zhen; Xie, Qingguo; Hu, Daoyu

    2011-03-01

    Liver tumor, one of the most wide-spread diseases, has a very high mortality in China. To improve success rates of liver surgeries and life qualities of such patients, we implement an interactive liver surgery planning system based on contrastenhanced liver CT images. The system consists of five modules: pre-processing, segmentation, modeling, quantitative analysis and surgery simulation. The Graph Cuts method is utilized to automatically segment the liver based on an anatomical prior knowledge that liver is the biggest organ and has almost homogeneous gray value. The system supports users to build patient-specific liver segment and sub-segment models using interactive portal vein branch labeling, and to perform anatomical resection simulation. It also provides several tools to simulate atypical resection, including resection plane, sphere and curved surface. To match actual surgery resections well and simulate the process flexibly, we extend our work to develop a virtual scalpel model and simulate the scalpel movement in the hepatic tissue using multi-plane continuous resection. In addition, the quantitative analysis module makes it possible to assess the risk of a liver surgery. The preliminary results show that the system has the potential to offer an accurate 3D delineation of the liver anatomy, as well as the tumors' location in relation to vessels, and to facilitate liver resection surgeries. Furthermore, we are testing the system in a full-scale clinical trial.

  16. 76 FR 47271 - Implementation of Scientific Integrity Principles: Draft Plan for Public Comment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-04

    ... From the Federal Register Online via the Government Publishing Office NATIONAL SCIENCE FOUNDATION Implementation of Scientific Integrity Principles: Draft Plan for Public Comment AGENCY: National Science Foundation. ACTION: National Science Foundation (NSF) Implementation of Scientific Integrity...

  17. The VLA Sky Survey (VLASS): Technical Implementation Plans and Progress

    NASA Astrophysics Data System (ADS)

    Myers, Steven T.; Law, Casey J.; Baum, Stefi Alison; Chandler, Claire J.; Chatterjee, Shami; Lacy, Mark; Murphy, Eric J.; VLASS Survey Science Group

    2016-01-01

    The VLA Sky Survey (VLASS) was initiated to exploit the science and technical opportunities for a new large radio astronomical survey using the Karl G. Jansky Very Large Array. In March 2015, the proposal for the VLASS underwent a formal Community Review. What emerged from this review is a 5400 hour project to survey the 33885 square degrees of the sky above Declination -40 degrees from 2-4 GHz at 2MHz frequency resolution and 2.5" angular resolution. Over the survey duration of 7 years, each area of the sky will be covered in 3 epochs spaced 32 months apart, to a depth of 0.12mJy/beam rms noise per epoch (0.07mJy/beam combined) in total intensity (Stokes I) and including full polarization. Observations are planned to commence in mid-2016. The raw data will be available in the NRAO archive immediately with no proprietary period and science data products will be provided to the community in a timely manner.In this presentation we describe the survey design and the Technical Implementation Plan (TIP) for the VLASS. The VLASS Basic Data Products (BDP) that will be produced by the survey team include: raw and calibrated visibility data, quick-look continuum images, single-epoch images and spectral image cubes, single-epoch basic object catalogs, and cumulative "static sky" images and image cubes and basic object catalogs to the full survey depth. Calibration, image processing, and analysis for the VLASS will be carried out through automated pipelines being developed at NRAO. Integral to this workflow is maintaining Quality Assurance throughout the system from telescope to archive. The storage and archive services budgeted for the BDP is 1PB for the data and images combined. Significantly higher storage would be required to serve the highest spectral resolution spectral cubes over the full sky area, and thus devising an affordable strategy for providing these services is critical, for example through "Processing on Demand" based on user query of the archive. We will

  18. Marketing: Realistic Tips for Planning and Implementation in Special Libraries.

    ERIC Educational Resources Information Center

    Kassel, Amelia

    2002-01-01

    Discusses the need for special libraries to have a marketing plan in order to increase support and plan for the future. Topics include finding the time; budgets and marketing; promoting library services; the use of outside consultants; making market planning a continuous process; and marketing efforts at product shows. (LRW)

  19. Ames Research Center FY 2000 Implementation Plan: Leading Technology into the New Millennium

    NASA Technical Reports Server (NTRS)

    2000-01-01

    This document presents the implementation plan for Ames Research Center (ARC) within the overall framework of the NASA Strategic Plan. It describes how ARC intends to implement its Center of Excellence responsibilities, Agency assigned missions, Agency and Enterprise lead programs, and other roles in support of NASA's vision and mission. All Federal agencies are required by the 1993 Government Performance and Results Act to implement a long-term strategic planning process that includes measurable outcomes and strict accountability. At NASA, this planning process is shaped by the Space Act of 1958, annual appropriations, and other external mandates, as well as by customer requirements. The resulting Strategic Plan sets the overall architecture for what we do, identifies who our customers are, and directs where we are going and why. The Strategic Plan is the basis upon which decisions regarding program implementation and resource deployment are made. Whereas the strategic planning process examines the long-term direction of the organization and identifies a specific set of goals, the implementation planning process examines the detailed performance of the organization and allocates resources toward meeting these goals. It is the purpose of this implementation document to provide the connection between the NASA Strategic Plan and the specific programs and support functions that ARC employees perform. This connection flows from the NASA Strategic Plan, through the various Strategic Enterprise plans to the ARC Center of Excellence, primary missions, Lead Center programs, program support responsibilities, and ultimately, to the role of the individual ARC employee.

  20. EPOS Thematic Core Service Anthropogenic Hazards: Implementation Plan

    NASA Astrophysics Data System (ADS)

    Orlecka-Sikora, Beata; Lasocki, Stanislaw; Grasso, Jean Robert; Schmittbuhl, Jean; Styles, Peter; Kwiatek, Grzegorz; Sterzel, Mariusz; Garcia, Alexander

    2015-04-01

    EPOS Thematic Core Service ANTHROPOGENIC HAZARDS (TCS AH) aims to integrate distributed research infrastructures (RI) to facilitate and stimulate research on anthropogenic hazards (AH) especially those associated with the exploration and exploitation of geo-resources. The innovative element is the uniqueness of the integrated RI which comprises two main deliverables: (1) Exceptional datasets, called "episodes", which comprehensively describe a geophysical process; induced or triggered by human technological activity, posing hazard for populations, infrastructure and the environment, (2) Problem-oriented, bespoke services uniquely designed for the discrimination and analysis of correlations between technology, geophysical response and resulting hazard. These objectives will be achieved through the Science-Industry Synergy (SIS) built by EPOS WG10, ensuring bi-directional information exchange, including unique and previously unavailable data furnished by industrial partners. The Episodes and services to be integrated have been selected using strict criteria during the EPOS PP. The data are related to a wide spectrum of inducing technologies, with seismic/aseismic deformation and production history as a minimum data set requirement and the quality of software services is confirmed and referenced in literature. Implementation of TCS AH is planned for four years and requires five major activities: (1) Strategic Activities and Governance: will define and establish the governance structure to ensure the long-term sustainability of these research infrastructures for data provision through EPOS. (2) Coordination and Interaction with the Community: will establish robust communication channels within the whole TCS AH community while supporting global EPOS communication strategy. (3) Interoperability with EPOS Integrated Core Service (ICS) and Testing Activities: will coordinate and ensure interoperability between the RIs and the ICS. Within this modality a functional e

  1. Technical Implementation Plan for the VLA Sky Survey (VLASS)

    NASA Astrophysics Data System (ADS)

    Myers, Steven T.; Law, Casey J.; Baum, Stefi Alison; Brandt, W. Niel; Chandler, Claire J.; Clarke, Tracy E.; Condon, James J.; Cordes, James M.; Deustua, Susana E.; Dickinson, Mark; Gugliucci, Nicole E.; Hallinan, Gregg; Lazio, Joseph; Hodge, Jacqueline; Lang, Cornelia C.; Mao, Sui Ann; Murphy, Eric J.; Osten, Rachel A.; Richards, Gordon T.; Strauss, Michael A.; White, Richard L.; Zauderer, Bevin

    2015-01-01

    The Karl G. Jansky Very Large Array is a recently completed rejuvenation of the VLA, providing observers with significantly increased continuum sensitivity and spectral survey speeds. Given the potential for new centimeter-wavelength sky surveys with this enhanced facility, the VLA Sky Survey (VLASS) was initiated to exploit the science and technical opportunities for a new large survey. In this presentation we describe the survey design and the Technical Implementation Plan (TIP) for the VLASS.The proposed VLASS showcases the strengths and unique capabilities of the Jansky VLA, namely high resolution imaging and exquisite point-source sensitivity, which are critical for source identification, and full polarimetry with good performance even in lines of sight with high Faraday depth. This has led to the choice of observing from 2-4 GHz at 2MHz frequency resolution and 0.7"-2.1" angular resolution. The VLASS will be observed in multiple epochs over the span of at least 5 years. The data will be available in the NRAO archive immediately with no proprietary period and science data products will be provided to the community in a timely manner.To achieve its science goals requires the VLASS to address a number of key challenges in data management, computation, image processing, and analysis, and quality assurance. The VLASS basic data products include: raw visibility data, calibrated data, quick-look continuum images, single-epoch images and spectral image cubes, single-epoch basic object catalogs, cumulative "static sky" images and image cubes and basic object catalogs (generated after each epoch beyond the first). The storage required for these multi-epoch images range from 300TB to >80PB depending upon the desired time and spectral resolution. Devising an affordable strategy for providing these services, for example through use of "process on-demand" rather than image storage, is therefore critical. We will discuss opportunities for community involvement in VLASS

  2. Development of an Implementation Plan Related to Biological Opinion on Operation of the Federal Columbia River Power System ; Step 1: Review and Critique of Implementation Plans.

    SciTech Connect

    Neitzel, Duane A.; Bunn, Amoret

    2000-12-01

    The Draft Biological Opinion on Operation of the Federal Columbia River Power System calls for the development of 1- and 5-year implementation plans. These plans will provide the roadmap for planning and subsequent implementation of actions intended to meet specific performance standards (i.e., biological objectives) in a timely manner. To develop implementation plans the key tasks and sequences of steps must be determined. Those responsible for specific tasks must be identified and they must understand what they need to do. There must be assurances that the resources (human, physical, and fiscal) to complete the tasks are available. Motivation and incentive systems should be set up. Systems to coordinate efforts and guide activity must be devised and installed. An information management system must be designed to manage and analyze data and ensure that appropriate data are collected. This will aid managers in assessing whether individual activities or actions are tracking with stated goals and objectives. Training programs to improve managerial and worker capability in making and implementing plans should be designed. Managerial leadership to guide the efforts of all individuals in achieving the goals of the anadromous and resident fish recovery must be developed. It is the entire process of managing fish recovery in relationship to the Biological Opinion that will guide, coordinate, motivate, and control work and determine the effectiveness and efficiency of plan implementation.

  3. 75 FR 48627 - Approval and Promulgation of Air Quality Implementation Plans; Delaware; Administrative and Non...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-11

    ...; Administrative and Non-Substantive Changes to Existing Delaware SIP Regulations AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA proposes to approve the State Implementation Plan (SIP... Implementation Plan (SIP). In the Final Rules section of this Federal Register, EPA is approving the State's...

  4. Implementation Intentions for Buying, Carrying, Discussing and Using Condoms: The Role of the Quality of Plans

    ERIC Educational Resources Information Center

    de Vet, Emely; Gebhardt, Winifred Anne; Sinnige, Judith; Van Puffelen, Anne; Van Lettow, Britt; de Wit, John B. F.

    2011-01-01

    Forming implementation intentions (i.e. action plans that specify when, where and how a person will act) could be effective in promoting condom use on a large scale. However, the technique implies that people are able to form high quality implementation plans that are likely to induce behaviour change. Young single females, aged 16-30 years old,…

  5. 77 FR 34830 - Revisions to Federal Implementation Plans To Reduce Interstate Transport of Fine Particulate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-12

    ... Regulations EGU Electric Generating Unit FIP Federal Implementation Plan FR Federal Register EPA U.S... NODA Notice of Data Availability NO X Nitrogen Oxides SIP State Implementation Plan OMB Office of... fossil fuel-fired boilers, turbines, and combined cycle units that serve generators that...

  6. 76 FR 67396 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-01

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Placer County Air Pollution... proposing to approve revisions to the Placer County Air Pollution Control District (PCAPCD) and Sacramento Metro Air Quality Management District (SMAQMD) portions of the California State Implementation Plan...

  7. 76 FR 67067 - Approval and Promulgation of Implementation Plans; Iowa: Prevention of Significant Deterioration...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... EPA in the ``PSD and Title V Greenhouse Gas Tailoring Final Rule'' (75 FR 31514), hereafter referred... Submit State Implementation Plan Revisions Required for Greenhouse Gases,'' 75 FR 81874 (December 29... Program to Sources of Greenhouse Gas Emissions: Federal Implementation Plan,'' 75 FR 82246 (December...

  8. 77 FR 16940 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; Volatile Organic...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-23

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Illinois; Volatile... Clean Air Act (the Act), revisions to the Illinois State Implementation Plan (SIP) submitted on July 29... www.regulations.gov or in hard copy at the Environmental Protection Agency, Region 5, Air...

  9. 75 FR 11503 - Approval and Promulgation of Air Quality Implementation Plans; Minnesota

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-11

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Minnesota AGENCY...-specific revision to the Minnesota State Implementation Plan (SIP) for particulate matter less than 10 microns (PM 10 ) for Aggregate Industries Yard A Facility in Saint Paul, Ramsey County, Minnesota. On...

  10. 75 FR 45568 - Approval and Promulgation of Air Quality Implementation Plans; Minnesota

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-03

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Minnesota AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve Minnesota's request to amend its State Implementation Plan (SIP) for sulfur dioxide (SO 2 ). The Minnesota...

  11. 78 FR 8076 - Approval and Promulgation of Implementation Plans; Texas; Revisions to New Source Review (NSR...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-05

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; Texas; Revisions to New Source Review (NSR) State Implementation Plan (SIP); Emergency Orders AGENCY: Environmental Protection Agency... necessary to achieve and maintain the NAAQS. See 77 FR 74140. The Emergency Orders Program does not meet...

  12. 78 FR 40654 - Approval, Disapproval and Promulgation of Implementation Plans; State of Wyoming; Regional Haze...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-08

    ... partially approving and partially disapproving Wyoming's 40 CFR 51.309(g) regional haze SIP. 78 FR 34738. In.... at both locations. The comment period for the proposed rule published June 10, 2013 at 78 FR 34738 is...; Regional Haze State Implementation Plan; Federal Implementation Plan for Regional Haze; Notice of...

  13. 76 FR 40662 - Federal Implementation Plans for Iowa, Kansas, Michigan, Missouri, Oklahoma, and Wisconsin To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-11

    ... to Acid Rain Program; Revisions to the NO X SIP Call promulgated May 12, 2005 (70 FR 25162). ] B... Generating Unit FIP Federal Implementation Plan FR Federal Register EPA U.S. Environmental Protection Agency... Implementation Plans to Reduce Interstate Transport of Fine Particulate Matter and Ozone (75 FR 53613;...

  14. 78 FR 40011 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Removal of Consumer and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-03

    ... AGENCY 40 CFR Part 52 ; FRL-9828-2 Approval and Promulgation of Air Quality Implementation Plans... Virginia State Implementation Plan (SIP). The revisions remove four articles located in chapter 9VAC5-40 (Existing Stationary Sources) from the Virginia SIP. These articles are being removed from the Virginia...

  15. 78 FR 59317 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Revision to Emission...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-26

    ... Implementation Plan (SIP). The revision pertains to revised emission limitations for the R. Paul Smith Power... section 110 of the Clean Air Act. DATES: The proposed rule published on June 18, 2010 (75 FR 34670), is... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Maryland;...

  16. 78 FR 36440 - Approval and Promulgation of Implementation Plans; Tennessee; 110(a)(1) and (2) Infrastructure...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-18

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; Tennessee; 110(a)(1) and (2... conditionally approve in part, portions of the State Implementation Plan (SIP) submission, submitted by the... demonstrate that the State meets the requirements of sections 110(a)(1) and (2) of the Clean Air Act (CAA...

  17. 40 CFR 93.120 - Consequences of control strategy implementation plan failures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 21 2012-07-01 2012-07-01 false Consequences of control strategy... Consequences of control strategy implementation plan failures. (a) Disapprovals. (1) If EPA disapproves any submitted control strategy implementation plan revision (with or without a protective finding),...

  18. 40 CFR 93.120 - Consequences of control strategy implementation plan failures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 20 2014-07-01 2013-07-01 true Consequences of control strategy... Consequences of control strategy implementation plan failures. (a) Disapprovals. (1) If EPA disapproves any submitted control strategy implementation plan revision (with or without a protective finding),...

  19. 40 CFR 93.120 - Consequences of control strategy implementation plan failures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 21 2013-07-01 2013-07-01 false Consequences of control strategy... Consequences of control strategy implementation plan failures. (a) Disapprovals. (1) If EPA disapproves any submitted control strategy implementation plan revision (with or without a protective finding),...

  20. 77 FR 37812 - Approval and Promulgation of Air Quality Implementation Plans; South Carolina; Emissions Statements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-25

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; South Carolina... is taking direct final action to approve a portion of a State Implementation Plan (SIP) revision submitted on April 29, 2010, by the State of South Carolina, through the Department of Health...

  1. 77 FR 37841 - Approval and Promulgation of Air Quality Implementation Plans; South Carolina; Emissions Statements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-25

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; South Carolina... proposing to approve a portion of a State Implementation Plan (SIP) revision submitted on April 29, 2010, by the State of South Carolina, through the Department of Health and Environmental Control (SC DHEC),...

  2. 77 FR 65821 - Approval and Promulgation of Implementation Plans; New Mexico; Albuquerque/Bernalillo County...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-31

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; New Mexico; Albuquerque... Implementation Plan for Air Quality for the City of Albuquerque/Bernalillo County area pursuant to the Clean Air... the VPMD Procedures Manual; reorganizes 20.11.100 NMAC; and makes numerous non- substantive changes...

  3. 75 FR 73026 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Clean Air Interstate Rule

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-29

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Indiana; Clean Air... June 29, 2009, to revise the Indiana State Implementation Plan (SIP) under the Clean Air Act (CAA). The... Clean Air Interstate Rule (CAIR), for which EPA granted limited approval as an abbreviated SIP...

  4. 77 FR 12524 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Lead Ambient Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-01

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Indiana; Lead... Management (IDEM) on November 24, 2010, to revise the Indiana State Implementation Plan (SIP) for lead...

  5. 42 CFR 495.338 - Health information technology implementation advance planning document requirements (HIT IAPD).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... the Medicaid Program § 495.338 Health information technology implementation advance planning document... 42 Public Health 5 2012-10-01 2012-10-01 false Health information technology implementation advance planning document requirements (HIT IAPD). 495.338 Section 495.338 Public Health CENTERS...

  6. 42 CFR 495.338 - Health information technology implementation advance planning document requirements (HIT IAPD).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... the Medicaid Program § 495.338 Health information technology implementation advance planning document... 42 Public Health 5 2014-10-01 2014-10-01 false Health information technology implementation advance planning document requirements (HIT IAPD). 495.338 Section 495.338 Public Health CENTERS...

  7. 42 CFR 495.338 - Health information technology implementation advance planning document requirements (HIT IAPD).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... the Medicaid Program § 495.338 Health information technology implementation advance planning document... 42 Public Health 5 2011-10-01 2011-10-01 false Health information technology implementation advance planning document requirements (HIT IAPD). 495.338 Section 495.338 Public Health CENTERS...

  8. 42 CFR 495.338 - Health information technology implementation advance planning document requirements (HIT IAPD).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... the Medicaid Program § 495.338 Health information technology implementation advance planning document... 42 Public Health 5 2013-10-01 2013-10-01 false Health information technology implementation advance planning document requirements (HIT IAPD). 495.338 Section 495.338 Public Health CENTERS...

  9. 78 FR 63436 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Dayton-Springfield...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-24

    ...-2013-0378; FRL-9901-62-Region5] Approval and Promulgation of Air Quality Implementation Plans; Ohio... to revise the 1997 8-hour ozone maintenance air quality state implementation plan (SIP) for the... County, Ohio. The Toledo area consists of Lucas and Wood Counties. The Ohio portion of the...

  10. 77 FR 30900 - Approval and Promulgation of Implementation Plans; New Mexico; Albuquerque/Bernalillo County...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-24

    ... Fees; and 0 b. Adding a new entry for Part 2 (20.11.2 NMAC) in numerical order by part number to read... AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; New Mexico; Albuquerque... revisions to the applicable State Implementation Plan (SIP) for New Mexico Albuquerque/Bernalillo...

  11. 40 CFR 763.123 - May a State implement its own asbestos worker protection plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 30 2010-07-01 2010-07-01 false May a State implement its own asbestos... its own asbestos worker protection plan? This section describes the process under which a State may be... implement its own asbestos worker protection plan, rather than complying with the requirements of...

  12. 76 FR 80760 - Federal Implementation Plans for Iowa, Michigan, Missouri, Oklahoma, and Wisconsin and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-27

    ... Electric Generating Unit FIP Federal Implementation Plan FR Federal Register EPA U.S. Environmental... of Data Availability NO X Nitrogen Oxides SIP State Implementation Plan OMB Office of Management and... Impact Analysis SNPR Supplemental Notice of Proposed Rulemaking SO 2 Sulfur Dioxide TSD Technical...

  13. Perceived Use and Acceptance of Cloud Enterprise Resource Planning (ERP) Implementation in the Manufacturing Industries

    ERIC Educational Resources Information Center

    Adeboje, Adewale

    2015-01-01

    The purpose of this study was to gain an insight into perceived use and acceptance for implementing an enterprise resource planning system and the decision whether to contract out the enterprise resource planning (ERP) service to a cloud provider. Cloud-based ERP systems can provide many advantages to the normal implementation of the same systems…

  14. 77 FR 22540 - Approval and Promulgation of State Implementation Plan Revisions; Infrastructure Requirements for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-16

    ... refer to Division of Air Quality. (iii) The words EPA, we, us or our mean or refer to the United States... Implementation Plans for the 8-hour Ozone NAAQS'' (73 FR 16205). In the rule, EPA made a finding for each state... AGENCY 40 CFR Part 52 Approval and Promulgation of State Implementation Plan Revisions;...

  15. 78 FR 73472 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; State Boards Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-06

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Maryland; State... proposes to approve the State Implementation Plan (SIP) revision submitted by the State of Maryland for the..., Philadelphia, Pennsylvania 19103. Copies of the State submittal are available at the Maryland Department of...

  16. 77 FR 25953 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Removal of the 1980...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-02

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Maryland; Removal of the 1980 Consent Order for the Maryland Slag Company AGENCY: Environmental Protection Agency (EPA... submitted by the Maryland Department of Environment to revise the Maryland State Implementation Plan...

  17. 78 FR 19128 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Particulate Matter Standards

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-29

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Ohio; Particulate... state implementation plan (SIP) to a full approval. Ohio submitted a request to approve revised particulate matter (PM) rules on February 23, 2012. The PM rule revisions being approved establish...

  18. 78 FR 19164 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Particulate Matter Standards

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-29

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Ohio; Particulate... proposing to convert a conditional approval of specified provisions of the Ohio state implementation plan...) rules on February 23, 2012. The PM rule revisions being approved establish work practices for...

  19. 40 CFR 49.9870 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...-Region X Implementation Plan for the Burns Paiute Tribe of the Burns Paiute Indian Colony of Oregon § 49... incorporated and made part of the implementation plan for the Reservation of the Burns Paiute Indian Colony: (a....130Rule for limiting sulfur in fuels. (g) Section 49.131General rule for open burning. (h) Section...

  20. 75 FR 48628 - Approval and Promulgation of Implementation Plans; State of Missouri

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-11

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; State of Missouri AGENCY... Missouri State Implementation Plan (SIP) submitted by the state on June 17, 2009. The purpose of these revisions is to rescind the rule More Restrictive Emission Limitations for Particulate Matter in South...

  1. 77 FR 47530 - Approval and Promulgation of State Implementation Plans; Hawaii; Infrastructure Requirements for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-09

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of State Implementation Plans; Hawaii; Infrastructure Requirements for the 1997 8-Hour Ozone and the 1997 and 2006 Fine Particulate Matter National Ambient Air... approving in part and disapproving in part a State Implementation Plan (SIP) revision submitted by the...

  2. MRP (materiel requirements planning) II: successful implementation the hard way.

    PubMed

    Grubbs, S C

    1994-05-01

    Many manufacturing companies embark on MRP II implementation projects as a method for improvement. In spite of an increasing body of knowledge regarding successful implementations, companies continue to attempt new approaches. This article reviews an actual implementation, featuring some of the mistakes made and the efforts required to still achieve "Class A" performance levels. PMID:10134151

  3. 9 CFR 94.1 - Regions where rinderpest or foot-and-mouth disease exists; importations prohibited.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... List of CFR Sections Affected, which appears in the Finding Aids section of the printed volume and at...-mouth disease exists; importations prohibited. 94.1 Section 94.1 Animals and Animal Products ANIMAL AND... (INCLUDING POULTRY) AND ANIMAL PRODUCTS RINDERPEST, FOOT-AND-MOUTH DISEASE, EXOTIC NEWCASTLE DISEASE,...

  4. 9 CFR 94.1 - Regions where rinderpest or foot-and-mouth disease exists; importations prohibited.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... List of CFR Sections Affected, which appears in the Finding Aids section of the printed volume and at...-mouth disease exists; importations prohibited. 94.1 Section 94.1 Animals and Animal Products ANIMAL AND... (INCLUDING POULTRY) AND ANIMAL PRODUCTS RINDERPEST, FOOT-AND-MOUTH DISEASE, NEWCASTLE DISEASE,...

  5. 40 CFR 51.1002 - Submittal of State implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... evaluate sources of PM2.5 direct emissions and PM2.5 attainment plan precursors in accordance with §§ 51... as a PM2.5 attainment plan precursor and evaluate sources of SO2 emissions in the State for control measures. (2) The State must address NOX as a PM2.5 attainment plan precursor and evaluate sources of...

  6. Used fuel disposition campaign international activities implementation plan.

    SciTech Connect

    Nutt, W. M.

    2011-06-29

    countries with more mature programs. The U.S. fuel cycle is a once through fuel cycle involving the direct disposal of UNF, as spent nuclear fuel, in a geologic repository (previously identified at Yucca Mountain, Nevada), following at most a few decades of storage (wet and dry). The geology at Yucca Mountain, unsaturated tuff, is unique among all countries investigating the disposal of UNF and HLW. The decision by the U.S. Department of Energy to no longer pursue the disposal of UNF at Yucca Mountain and possibly utilize very long term storage (approaching 100 years or more) while evaluating future fuel cycle alternatives for managing UNF, presents a different UNF and HLW management R&D portfolio that has been pursued in the U.S. In addition, the research and development activities managed by OCRWM have been transferred to DOE-NE. This requires a reconsideration of how the UFDC will engage in cooperative and collaborative activities with other countries. This report presents the UFDC implementation plan for international activities. The DOE Office of Civilian Radioactive Waste Management (OCRWM) has cooperated and collaborated with other countries in many different 'arenas' including the Nuclear Energy Agency (NEA) within the Organization for Economic Co-operation and Development (OECD), the International Atomic Energy Agency (IAEA), and through bilateral agreements with other countries. These international activities benefited OCRWM through the acquisition and exchange of information, database development, and peer reviews by experts from other countries. DOE-NE cooperates and collaborates with other countries in similar 'arenas' with similar objectives and realizing similar benefits. However the DOE-NE focus has not typically been in the area of UNF and HLW management. This report will first summarize these recent cooperative and collaborative activities. The manner that the UFDC will cooperate and collaborate in the future is expected to change as R&D is conducted

  7. Behavior Intervention Planning and Implementation of Positive Behavioral Support Plans: An Examination of States' Adherence to Standards for Practice

    ERIC Educational Resources Information Center

    Killu, Kim; Weber, Kimberly P.; Derby, K. Mark; Barretto, Anjali

    2006-01-01

    To address the behavioral needs of students with disabilities in school settings, the Individuals with Disabilities Education Improvement Act of 2004 (IDEIA) requires the development and implementation of a behavior intervention plan/positive behavioral support plan (BIP/PBSP) based on positive behavioral interventions and supports (PBIS). Despite…

  8. Connecting the Dots--From Planning to Implementation: Translating Commitments into Action in a Strategic Planning Process

    ERIC Educational Resources Information Center

    Mieso, Rob Roba

    2010-01-01

    This study examines the implementation of the Commitments to Action (CTAs) that were developed for the Outreach Institutional Initiative (OII) as part of the 2006 strategic planning process at De Anza College. Although the strategic planning process identified four Institutional Initiatives (IIs) [Outreach, Individualized Attention to Student…

  9. Strategic Planning: Contextual Factors that Facilitated and/or Challenged the Implementation of Strategic Planning in Two Nonprofit Organizations

    ERIC Educational Resources Information Center

    Masilamony, Davadhasan

    2010-01-01

    As the nonprofit sector continues to grow in size and importance in American society, successful organizations proactively initiate strategic planning so they can be more responsive to changing circumstances, underlying trends, and shifting demands. At times, however, organizations develop elaborate plans that are never implemented. Unfortunately,…

  10. High performance computing and communications: FY 1997 implementation plan

    SciTech Connect

    1996-12-01

    The High Performance Computing and Communications (HPCC) Program was formally authorized by passage, with bipartisan support, of the High-Performance Computing Act of 1991, signed on December 9, 1991. The original Program, in which eight Federal agencies participated, has now grown to twelve agencies. This Plan provides a detailed description of the agencies` FY 1996 HPCC accomplishments and FY 1997 HPCC plans. Section 3 of this Plan provides an overview of the HPCC Program. Section 4 contains more detailed definitions of the Program Component Areas, with an emphasis on the overall directions and milestones planned for each PCA. Appendix A provides a detailed look at HPCC Program activities within each agency.

  11. 78 FR 73188 - Adequacy Status of Motor Vehicle Emissions Budget in Submitted State Implementation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-05

    ... AGENCY Adequacy Status of Motor Vehicle Emissions Budget in Submitted State Implementation Plan; Maricopa... vehicle emissions budget (MVEB) for particulate matter less than ten microns (PM-10) for the year 2012 in... Plan'') is adequate for transportation conformity purposes. The Five Percent Plan for PM-10 in...

  12. 40 CFR 52.1674 - Requirements for state implementation plan revisions relating to new motor vehicles.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PLANS (CONTINUED) New York § 52.1674 Requirements for state implementation plan revisions relating to new motor vehicles. New York's adopted LEV program must be revised to the extent necessary for the... plan revisions relating to new motor vehicles. 52.1674 Section 52.1674 Protection of...

  13. Numerous strategies but limited implementation guidance in US local adaptation plans

    NASA Astrophysics Data System (ADS)

    Woodruff, Sierra C.; Stults, Missy

    2016-08-01

    Adaptation planning offers a promising approach for identifying and devising solutions to address local climate change impacts. Yet there is little empirical understanding of the content and quality of these plans. We use content analysis to evaluate 44 local adaptation plans in the United States and multivariate regression to examine how plan quality varies across communities. We find that plans draw on multiple data sources to analyse future climate impacts and include a breadth of strategies. Most plans, however, fail to prioritize impacts and strategies or provide detailed implementation processes, raising concerns about whether adaptation plans will translate into on-the-ground reductions in vulnerability. Our analysis also finds that plans authored by the planning department and those that engaged elected officials in the planning process were of higher quality. The results provide important insights for practitioners, policymakers and scientists wanting to improve local climate adaptation planning and action.

  14. 94-1 Research and Development Project lead laboratory support: Fiscal year 1997. Progress report

    SciTech Connect

    McKee, S.D.

    1996-12-01

    On May 26, 1994, the Defense Nuclear Facilities Safety Board (DNFSB) issued Recommendation 94-1, which expressed the board`s concern about nuclear materials left in the manufacturing pipeline after the US halted its nuclear weapons production activities. The DNFSB emphasized the need for remediation of these materials. As part of Recommendation 94-1, the DNFSB defined research objectives as follows: that a research program be established to fill any gaps in the information base needed for choosing among the alternate processes to be used in safe conversion of various types of fissile materials to optimal forms for safe interim storage and the longer-term disposition. To achieve this objective a research and technology development program with two elements is needed: a technology-specific program that is focused on treating and storing materials safety, with concomitant development of storage criteria and surveillance requirements, centered around 3- and 8-year targets; and a core technology program to augment the knowledge base about general chemical and physical processing and storage behavior and to assure safe interim material storage until disposition policies are formulated. The paper reports the progress on the following: materials identification and surveillance; stabilization process development; surveillance and monitoring; core technologies; and project management.

  15. Pandemic preparedness: implementation of infection prevention emergency plans.

    PubMed

    Rebmann, Terri

    2010-11-01

    The H1N1 influenza pandemic provided a real‐world test of hospital disaster plans. Challenges to hospitals included inconsistent use of isolation precautions; changing and conflicting guidelines; lack of available supplies, including N95 respirators and medications; and overwhelming amounts of information that required sifting. Further research is needed regarding pandemic planning. PMID:20929374

  16. Pandemic preparedness: implementation of infection prevention emergency plans.

    PubMed

    Rebmann, Terri

    2010-11-01

    The H1N1 influenza pandemic provided a real‐world test of hospital disaster plans. Challenges to hospitals included inconsistent use of isolation precautions; changing and conflicting guidelines; lack of available supplies, including N95 respirators and medications; and overwhelming amounts of information that required sifting. Further research is needed regarding pandemic planning.

  17. Beyond the Diversity Crisis Model: Decentralized Diversity Planning and Implementation

    ERIC Educational Resources Information Center

    Williams, Damon A.

    2008-01-01

    This article critiques the diversity crises model of diversity planning in higher education and presents a decentralized diversity planning model. The model is based on interviews with the nation's leading diversity officers, a review of the literature and the authors own experiences leading diversity change initiatives in higher education. The…

  18. A Three Step Plan for Implementing an Affirmative Action Program

    ERIC Educational Resources Information Center

    Hilaael, Timothy M.

    1976-01-01

    (1) Centralize organizational responsibility for affirmative action. (2) Conduct an organizational audit related to the Equal Employment Opportunity Act. (3) Implement affirmative action as an administrative responsibility. (Author)

  19. 75 FR 8008 - Revisions to the California State Implementation Plan, Imperial County Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-23

    ... for the Implementation of Title I of the Clean Air Act Amendments of 1990,'' 57 FR 13498 (April 16, 1992); 57 FR 18070 (April 28, 1992). 4. ``State Implementation Plans for Serious PM-10 Nonattainment... Preamble for the Implementation of Title I of the Clean Air Act Amendments of 1990,'' 59 FR 41998...

  20. 78 FR 54200 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Maintenance Plan Update...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-03

    ... Plan Update for Lake County, Indiana for Sulfur Dioxide AGENCY: Environmental Protection Agency (EPA..., Indiana sulfur dioxide (SO 2 ) maintenance area. This plan update demonstrates that Lake County...

  1. Strategic Planning, Implementation, and Evaluation Processes in Hospital Systems: A Survey From Iran

    PubMed Central

    Sadeghifar, Jamil; Jafari, Mehdi; Tofighi, Shahram; Ravaghi, Hamid; Maleki, Mohammad Reza

    2015-01-01

    Aim & Background: Strategic planning has been presented as an important management practice. However, evidence of its deployment in healthcare systems in low-income and middle-income countries (LMICs) is limited. This study investigated the strategic management process in Iranian hospitals. Methods: The present study was accomplished in 24 teaching hospitals in Tehran, Iran from September 2012 to March 2013. The data collection instrument was a questionnaire including 130 items. This questionnaire measured the situation of formulation, implementation, and evaluation of strategic plan as well as the requirements, facilitators, and its benefits in the studied hospitals. Results: All the investigated hospitals had a strategic plan. The obtained percentages for the items “the rate of the compliance to requirements” and “the quantity of planning facilitators” (68.75%), attention to the stakeholder participation in the planning (55.74%), attention to the planning components (62.22%), the status of evaluating strategic plan (59.94%) and the benefits of strategic planning for hospitals (65.15%) were in the medium limit. However, the status of implementation of the strategic plan (53.71%) was found to be weak. Significant statistical correlations were observed between the incentive for developing strategic plan and status of evaluating phase (P=0.04), and between status of implementation phase and having a documented strategic plan (P=0.03). Conclusion: According to the results, it seems that absence of appropriate internal incentive for formulating and implementing strategies led more hospitals to start formulation strategic planning in accordance with the legal requirements of Ministry of Health. Consequently, even though all the investigated hospital had the documented strategic plan, the plan has not been implemented efficiently and valid evaluation of results is yet to be achieved. PMID:25716385

  2. Tank waste remediation system privatization phase 1 infrastructure project, systems engineering implementation plan

    SciTech Connect

    Schaus, P.S.

    1998-08-19

    This Systems Engineering Implementation Plan (SEIP) describes the processes, products, and organizational responsibilities implemented by Project W-519 to further define how the project`s mission, defined initially by the Tank Waste Remediation System Phase 1 Privatization Infrastructure Project W-503 Mission Analysis Report (Hoertkorn 1997), will be accomplished using guidance provided by the Tank Waste Remediation System Systems Engineering Management Plan (SEMP) (Peck 1998). This document describes the implementation plans for moving from a stated mission to an executable cost, schedule, and technical baseline and to help ensure its successful completion of those baselines.

  3. Creating an IPE infusion plan: from foundation to implementation.

    PubMed

    Pinto Zipp, Genevieve; Maher, Catherine; LaFountaine, Michael; Rizzolo, Denise; Dayalu, Vikram; Goeckel, Carolyn; Torcivia, Elizabeth; Phillips, H James

    2014-01-01

    Today's health care system has embraced the model of collaborative interprofessional efforts among health care professionals to achieve desired patient health outcomes. The Academy can offer the foundational experiences needed to support and develop interprofessional patient-centered plans of care for health professional students. This paper explores one institution's approach to the creation of an infusion plan which the authors have termed a "structured immersion approach" (SIA) to interprofessional education (IPE). The SIA supports "Core Signature IPE" experiences within existing silo-based curriculums that allow for interprofessional education experiences and the appreciation of the importance of interprofessional practice in today's health care. PMID:24925042

  4. New Horizons Risk Communication Strategy, Planning, Implementation, and Lessons Learned

    NASA Technical Reports Server (NTRS)

    Dawson, Sandra A.

    2006-01-01

    This paper discusses the risk communication goals, strategy, planning process and product development for the New Horizons mission, including lessons from the Cassini mission that were applied in that effort, and presents lessons learned from the New Horizons effort that could be applicable to future missions.

  5. Succession planning for RNs: implementing a nurse management internship.

    PubMed

    Wendler, M Cecilia; Olson-Sitki, Kristi; Prater, Marsha

    2009-01-01

    The nursing shortage affects all levels, including the pivotal role of nurse managers, who may find themselves functioning in a complex, stressful work environment. In this increasingly difficult milieu, succession planning for nurse manager turnover is imperative. The authors describe an evidence-based, theoretically driven nurse management internship that allows staff nurses to explore the nurse manager role.

  6. Language Planning and Implementation in Turkish Primary Schools

    ERIC Educational Resources Information Center

    Kirkgoz, Yasemin

    2007-01-01

    This paper explores a major curriculum innovation in English language teaching in Turkish primary education from macro and micro perspectives. After an overview of the role of English in Turkey, macro-level planning underlying the introduction of English language teaching policy in state-owned primary education is presented. Then the diffusion of…

  7. The Gap between Planning and Implementation in Nigerian Education.

    ERIC Educational Resources Information Center

    Nwankwo, John I.

    1980-01-01

    Surveys educational development in Nigeria during the 1970s with emphasis on changes in educational objectives and administration since the colonial period, the role of education in Nigeria's drive for modernity, the rationale of educational planning, education and economic growth, educational goals, and constraints on innovation (poverty, lack of…

  8. Performance Guide for Planning, Implementing and Evaluating Vocational Special Needs.

    ERIC Educational Resources Information Center

    North Dakota State Board for Vocational Education, Bismarck.

    Intended to guide the development or expansion of programs and services for North Dakota vocational special needs students, this document offers local school administrators and instructional and support staff a unified system for planning and delivering services. The document explains a series of 15 tasks to be carried out to develop or upgrade…

  9. Planning for Success: Successful Implementation of Middle Level Reorganization.

    ERIC Educational Resources Information Center

    Williamson, Ronald; Johnston, J. Howard

    Drawing on the experience of public schools in Ann Arbor, Michigan, this document details a planning model and process of middle level reorganization. Following an examination of the impetus for change and how recent changes in the nation's economy, demographics, and family structure have shaped the context for educational change, collaborative…

  10. Superfund strategic plan and implementation strategy fiscal year 1994

    SciTech Connect

    Not Available

    1994-01-01

    This Plan presents the Superfund Program's strategic direction for Fiscal Year 1994. The Vision for the program is: Build public confidence in the Superfund and Oil Pollution Response Programs; The Mission for the program is: Superfund: dedicated to reducing risks to people and the environment by cleaning up the Nation's hazardous waste problems and making polluters pay.

  11. Performance assessment implementation plan for the geologic repository program

    SciTech Connect

    1990-01-01

    Performance assessment is a major constituent of the program being conducted in the Civilian Radioactive Waste Management (CRWM) Program of the US Department of Energy (DOE) to develop a geologic repository. Performance assessment is the set of activities needed for quantitative evaluations of repository-system performance to access compliance with regulations and to support the development of the geologic repository. To define the strategy for these evaluations, the DOE has developed this performance assessment strategy plan. This document discusses the need for such a strategy, the objectives and scope of the strategy plan, the relationship of the plan to other program plans. Additionally, it defines performance assessment and describes the roles of performance assessment in this program, discusses concepts and general strategies needed for performance assessment, outlines the content of the Safety Analysis Report, summarizes the requirements for the repository Environmental Impact Statement, discusses the requirements that apply to the site-suitability analyses and describes the site characterization. 10 figs., 7 tabs.

  12. NHEERL CONTAMINATED SEDIMENT RESEARCH MULTI-YEAR IMPLEMENTATION PLAN (2005)

    EPA Science Inventory

    ORD has developed a multi-year plan (MYP) called the Contaminated Sites MYP to address the research needs of EPA's Office of Superfund Remediation and Technology Innovation (OSRTI). One of the long-term goals of the Contaminated Sites MYP relates to contaminated sediments, and t...

  13. National Risk Management Research Laboratory Strategic plan and Implementation - Overview

    EPA Science Inventory

    This publication provides an overview of the strategic plan recently developed by the National Risk Management Research Laboratory (NRMRL). It includes a description of NRMRL's mission and goals and their alignment with Agency goals. Additionally, the overview contains a brief se...

  14. 9 CFR 94.1 - Regions where rinderpest or foot-and-mouth disease exists; importations prohibited.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Register citations affecting § 94.1, see the List of CFR Sections Affected, which appears in the Finding... Islands, Chile, Costa Rica, Czech Republic, Denmark, Dominican Republic, El Salvador, Estonia,...

  15. 9 CFR 94.1 - Regions where rinderpest or foot-and-mouth disease exists; importations prohibited.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Register citations affecting § 94.1, see the List of CFR Sections Affected, which appears in the Finding... Islands, Chile, Costa Rica, Czech Republic, Denmark, Dominican Republic, El Salvador, Estonia,...

  16. 75 FR 40762 - Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-14

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality Management District and South Coast Air Quality Management District AGENCY: Environmental... Sacramento Metropolitan Air Quality Management District (SMAQMD) and South Coast Air Quality...

  17. 76 FR 43175 - Approval and Promulgation of Implementation Plans; State of California; Interstate Transport of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-20

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; State of California; Interstate Transport of Pollution; Significant Contribution to Nonattainment and Interference With...

  18. 77 FR 73005 - Revisions to the California State Implementation Plan, Imperial County, Placer County, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-07

    ... County, and Ventura County Air Pollution Control Districts AGENCY: Environmental Protection Agency (EPA... Pollution Control District (ICAPCD), Placer County Air Pollution Control District (PCAPCD) and Ventura County Air Pollution Control District (PCAPCD) portions of the California State Implementation Plan...

  19. 75 FR 66699 - Lacey Act Implementation Plan; Definitions for Exempt and Regulated Articles

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-29

    ... published in the Federal Register (75 FR 46859-46861, Docket No. APHIS-2009-0018) a proposal to establish... Implementation Plan; Definitions for Exempt and Regulated Articles AGENCY: Animal and Plant Health...

  20. 78 FR 56729 - Final Environmental Impact Statement, Habitat Conservation Plan, and Implementing Agreement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-13

    ... Fish and Wildlife Service Final Environmental Impact Statement, Habitat Conservation Plan, and Implementing Agreement; Beech Ridge Wind Power Project, Greenbrier and Nicholas Counties, West Virginia AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of availability: final environmental...

  1. 77 FR 66548 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-06

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is approving revisions to the San Joaquin Valley Unified Air Pollution Control District... State Implementation Plan, San Joaquin Valley Unified Air Pollution Control District's Rule 4352,...

  2. 76 FR 41745 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-15

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule... Valley Unified Air Pollution Control District portion of the California State Implementation Plan (SIP... Valley Unified Air Pollution Control District (SJVUAPCD) Rule 4682, Polystyrene, Polyethylene,...

  3. 76 FR 34630 - Approval and Promulgation of Implementation Plans; New Hampshire: Prevention of Significant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-14

    ... Fuel Economy Standards; Final Rule.'' 75 FR 25324 (May 7, 2010). \\5\\ ``Prevention of Significant... AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; New Hampshire: Prevention of... Hampshire's Prevention of Significant Deterioration (PSD) program to establish appropriate...

  4. 78 FR 28173 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Sulfur Dioxide and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-14

    ... Dioxide and Nitrogen Dioxide Ambient Air Quality Standards AGENCY: Environmental Protection Agency (EPA... Indiana state implementation plan (SIP) for nitrogen dioxide (NO 2 ) and sulfur dioxide (SO 2 ) under...

  5. Preparation, review, and approval of implementation plans for nuclear safety requirements

    SciTech Connect

    Not Available

    1994-10-01

    This standard describes an acceptable method to prepare, review, and approve implementation plans for DOE Nuclear Safety requirements. DOE requirements are identified in DOE Rules, Orders, Notices, Immediate Action Directives, and Manuals.

  6. 78 FR 21581 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality... the Antelope Valley Air Quality Management District (AVAQMD), Monterey Bay Unified Air...

  7. Implementation Plan for Chemical Industry R&D Roadmap for Nanomaterials by Design

    SciTech Connect

    none,

    2006-04-01

    The purpose of this effort is to develop an implementation plan to realize the vision and goals identified in the Chemical Industry R&D Roadmap for Nanomaterials By Design: From Fundamentals to Function.

  8. 77 FR 68721 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Deferral for CO2

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-16

    ... rule published on September 7, 2012 (77 FR 55171) is reopened through December 17, 2012. All comments... revision to the Maryland State Implementation Plan (SIP) that would incorporate EPA's ``Biomass...

  9. 40 CFR 49.9870 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Indian Colony of Oregon § 49.9870 Federally-promulgated regulations and Federal implementation plans. The... Burns Paiute Indian Colony: (a) Section 49.123General provisions. (b) Section 49.124Rule for...

  10. 75 FR 11503 - Approval and Promulgation of Implementation Plans; Texas; Revisions to Chapter 116 Which Relate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-11

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Parts 52 Approval and Promulgation of Implementation Plans; Texas; Revisions to Chapter 116 Which Relate to the Permit Renewal Application and Permit Renewal Submittal AGENCY:...

  11. 75 FR 57412 - Approval and Promulgation of Implementation Plans Alabama: Volatile Organic Compounds

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-21

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans Alabama: Volatile Organic... ``volatile organic compounds'' (VOCs) found at Alabama Administrative Code section...

  12. 77 FR 60907 - Approval and Promulgation of Implementation Plans; Vermont: Prevention of Significant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-05

    ... Greenhouse Gas Emission Standards and Corporate Average Fuel Economy Standards; Final Rule.'' 75 FR 25324... Deterioration Provisions Concerning Greenhouse Gas Emitting-Sources in State Implementation Plans.'' 75 FR 82536... Significant Deterioration; Greenhouse Gas Permitting Authority and Tailoring Rule AGENCY:...

  13. 76 FR 5203 - Draft Environmental Impact Statement, Stehekin River Corridor Implementation Plan, North Cascades...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-28

    ... National Park Service Draft Environmental Impact Statement, Stehekin River Corridor Implementation Plan, North Cascades National Park Service Complex; Chelan, Skagit, and Whatcom Counties, WA AGENCY: National Park Service, Interior. ACTION: Notice of extension of public comment period. SUMMARY: The...

  14. 75 FR 18782 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Alternate Monitoring...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-13

    ... Monitoring Requirements for Indianapolis Power and Light--Harding Street Station AGENCY: Environmental... State Implementation Plan alternative monitoring requirements for Indianapolis Power and Light Company... alternative monitoring requirements that allow the use of a particulate matter continuous emissions...

  15. 78 FR 53386 - Approval and Promulgation of Implementation Plans; State of Missouri; St. Louis Area...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-29

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; State of Missouri; St. Louis Area Transportation Conformity Requirements AGENCY: Environmental Protection Agency (EPA)....

  16. 78 FR 19434 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Transportation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-01

    ...; Transportation Conformity Regulations AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule... incorporate Federal revisions to transportation conformity requirements. In the Final Rules section of this... Quality Implementation Plans; Virginia; Transportation Conformity Regulations,'' that is located in...

  17. RCRA implementation plan: Fiscal year 1995: Addendum containing changes, clarifications, or additions to FY 1994 rip

    SciTech Connect

    1994-07-01

    The report provides additional information to supplement the `RCRA implementation plan: fiscal year 1994`. It describes the objectives and priorities EPA has set for the RCRA program. It also discusses waste minimization, environmental justice, corrective action, and biennial reporting.

  18. 76 FR 26224 - Revisions to the California State Implementation Plan, Northern Sonoma County Air Pollution...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-06

    ... Pollution Control District (NSCAPCD) and Mendocino County Air Quality Management District (MCAQMD) AGENCY... the Northern Sonoma County Air Pollution Control District (NSCAPCD) and Mendocino County Air Quality Management District (MCAQMD) portions of the California State Implementation Plan (SIP). Both districts...

  19. 77 FR 12527 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-01

    ... Management District and San Joaquin Valley Unified Air Pollution Control District AGENCY: Environmental... Antelope Valley Air Quality Management District (AVAQMD) and San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portions of the California State Implementation Plan (SIP). These...

  20. 77 FR 63743 - Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-17

    ... Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA is taking direct final action to approve revisions to the Sacramento Metropolitan Air Quality Management District (SMAQMD) portion of the California State Implementation Plan (SIP). These...

  1. 75 FR 48895 - Approval and Promulgation of Air Quality Implementation Plans; MN

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-12

    ... From the Federal Register Online via the Government Publishing Office ] ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; MN AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve...

  2. 94-1 Research and development project lead laboratory support. Status report, January 1--March 31, 1997

    SciTech Connect

    Rink, N.A.

    1997-08-01

    This status report is published for Los Alamos National Laboratory 94-1 Research and Development Project Support. The Department of Energy Office of Environmental Management funds these projects in order to support the storage or disposal of legacy plutonium and plutonium-bearing materials that resulted from weapons production throughout the DOE complex. This report summarizes status and technical progress for Los Alamos 94-1 projects during the second quarter of fiscal year 1997.

  3. 49 CFR 236.1011 - PTC Implementation Plan content requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... rolling stock by December 31, 2015; (iii) All documents and information required by § 236.1006; and (iv... and the installation schedule to complete wayside equipment installation by December 31, 2015; (8... equipped during the period of primary implementation ending December 31, 2015. (4) As used in...

  4. 49 CFR 236.1011 - PTC Implementation Plan content requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... rolling stock by December 31, 2015; (iii) All documents and information required by § 236.1006; and (iv... and the installation schedule to complete wayside equipment installation by December 31, 2015; (8... equipped during the period of primary implementation ending December 31, 2015. (4) As used in...

  5. Carbon Offset Forestry: Forecasting Ecosystem Effects (COFFEE) Project Implementation Plan

    EPA Science Inventory

    COFFEE will evaluate the environmental impacts of implementing various COF practices by using the amount of total ecosystem C (TEC) sequestered in forests as the integrative response metric. These evaluations will be done for current-climate and future-climate scenarios and will...

  6. An Implementation Plan for NFS at NASA's NAS Facility

    NASA Technical Reports Server (NTRS)

    Lam, Terance L.; Kutler, Paul (Technical Monitor)

    1998-01-01

    This document discusses how NASA's NAS can benefit from the Sun Microsystems' Network File System (NFS). A case study is presented to demonstrate the effects of NFS on the NAS supercomputing environment. Potential problems are addressed and an implementation strategy is proposed.

  7. The Implementation of Planned Educational Change: A Theoretical Discussion.

    ERIC Educational Resources Information Center

    Coley, Thomas G.

    Empirical research pertaining to the relationship between external agencies' decisions and the implementation of these decisions suggests two conclusions. First, the implementors of change are likely to view externally initiated change with apprehension and resistance, and second, when external agencies initiate change, the result depends on…

  8. Planning, Implementation, and Evaluation of AIDS Education Programs for Dentists.

    ERIC Educational Resources Information Center

    Gerbert, Barbara; And Others

    1991-01-01

    An office-based continuing education program on acquired immune deficiency syndrome (AIDS) for dentists is described, including needs assessment, model development, local piloting, national implementation with 119 dentists, and evaluation phases. Program evaluation indicated an improvement in risk perception, knowledge, and practice resulted, but…

  9. Typical School Personnel Developing and Implementing Basic Behavior Support Plans

    ERIC Educational Resources Information Center

    Strickland-Cohen, M. Kathleen; Horner, Robert H.

    2015-01-01

    We evaluated the ability of typical school personnel with basic behavioral training to develop and implement function-based supports for students with mild to moderate problem behaviors. Descriptive results indicated that following four 1-hr training sessions, 13 participants were able to (a) identify interventions that were and were not…

  10. System Engineering Management and Implementation Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)

    SciTech Connect

    VAN BEEK, J.E.

    2000-05-05

    This systems Engineering Management and Implementation Plan (SEMIP) describes the Project W-211 implementation of the Tank Farm Contractor Systems Engineering Management Plan (TFC SEMP). The SEMIP defines the systems engineering products and processes used by the project to comply with the TFC SEMP, and provides the basis for tailoring systems engineering processes by applying a graded approach to identify appropriate systems engineering requirements for W-211.

  11. Plutonium Vulnerability Management Plan

    SciTech Connect

    1995-03-01

    This Plutonium Vulnerability Management Plan describes the Department of Energy`s response to the vulnerabilities identified in the Plutonium Working Group Report which are a result of the cessation of nuclear weapons production. The responses contained in this document are only part of an overall, coordinated approach designed to enable the Department to accelerate conversion of all nuclear materials, including plutonium, to forms suitable for safe, interim storage. The overall actions being taken are discussed in detail in the Department`s Implementation Plan in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. This is included as Attachment B.

  12. Evaluating the implementation of environmental review mitigation in local planning and development processes

    SciTech Connect

    Slotterback, Carissa Schively

    2008-11-15

    The implementation of mitigation strategies and outcomes of environmental review remains a challenge for planners and regulators. While the process and content of environmental review is clearly defined, there is often little attention to what happens after the review is completed. This paper presents the results of an evaluation of the implementation of the outcomes of environmental review, specifically mitigation measures designed to respond to environmental impacts identified in the environmental impact analysis. Drawing on previous evaluations of environmental review outcomes and plan implementation, the research provides a methodology for evaluating the implementation of mitigation efforts, points to the challenges associated with implementing the mitigation outcomes of local environmental review in planning and development processes, and identifies opportunities to integrate planning and environmental review processes.

  13. 40 CFR 52.36 - What are the requirements of the Federal Implementation Plans (FIPs) for the Clean Air Interstate...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Federal Implementation Plans (FIPs) for the Clean Air Interstate Rule (CAIR) relating to emissions of... What are the requirements of the Federal Implementation Plans (FIPs) for the Clean Air Interstate Rule... part 97 of this chapter constitute the Clean Air Interstate Rule Federal Implementation Plan...

  14. 40 CFR 52.36 - What are the requirements of the Federal Implementation Plans (FIPs) for the Clean Air Interstate...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Federal Implementation Plans (FIPs) for the Clean Air Interstate Rule (CAIR) relating to emissions of... What are the requirements of the Federal Implementation Plans (FIPs) for the Clean Air Interstate Rule... part 97 of this chapter constitute the Clean Air Interstate Rule Federal Implementation Plan...

  15. 77 FR 44485 - Approval and Promulgation of Implementation Plans; Florida; Sections 128 and 110(a)(1) and (2...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-30

    ... Program to Sources of Greenhouse Gas Emissions: Federal Implementation Plan--Final Rule, 75 FR 82246... AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; Florida; Sections 128 and 110(a... action to approve in part, and disapprove in part, the State Implementation Plan (SIP)...

  16. 40 CFR 52.36 - What are the requirements of the Federal Implementation Plans (FIPs) for the Clean Air Interstate...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal Implementation Plans (FIPs) for the Clean Air Interstate Rule (CAIR) relating to emissions of... What are the requirements of the Federal Implementation Plans (FIPs) for the Clean Air Interstate Rule... part 97 of this chapter constitute the Clean Air Interstate Rule Federal Implementation Plan...

  17. Space physics strategy: Implementation study. Volume 2: Program plan

    NASA Technical Reports Server (NTRS)

    1991-01-01

    In June, 1989, the Space Science and Applications Advisory Committee (SSAAC) authorized its Space Physics Subcommittee (SPS) to prepare a plan specifying the future missions, launch sequence, and encompassing themes of the Space Physics Division. The plan, now complete, is the product of a year-long study comprising two week-long workshops - in January and June 1990 - assisted by pre-workshop, inter-workshop, and post-workshop preparation and assessment activities. The workshops engaged about seventy participants, drawn equally from the Division's four science disciplines: cosmic and heliospheric physics, solar physics, magnetosphere physics, and ionosphere-thermosphere-mesospheric physics. An earlier report records the outcome of the first workshop; this is the report of the final workshop.

  18. Implement balanced scorecard to translate strategic plan into actionable objectives.

    PubMed

    2004-09-01

    Faced with challenges ranging from declining reimbursement to staff shortages, health care organizations--integrated delivery systems, physician group practices, disease management providers, and others--increasingly are turning to general business models to map out step-by-step action plans for performance measurement and process improvement. Creating a "balanced scorecard" is an obvious starting point for assessing and improving clinical and financial performance. PMID:15544069

  19. Long-Range Plan, Phase II: Implementation Plan, 1994-1999. Holyoke Community College.

    ERIC Educational Resources Information Center

    Holyoke Community Coll., MA.

    The Long-Range Planning Committee at Holyoke Community College (HCC) in Massachusetts has devised a 5-year plan to help the college focus on its most important priorities as it seeks to grow and accommodate change. This planning document identifies seven major institutional goals, objectives comprised by each goal, long-range strategies to achieve…

  20. Hungry Horse Dam Fisheries Mitigation Implementation Plan, 1990-2003 Progress (Annual) Report.

    SciTech Connect

    Montana Department of Fish, Wildlife and Parks; Confederated Salish and Kootenai Tribes

    1993-03-10

    In this document the authors present mitigation implementation activities to protect and enhance resident fish and aquatic habitat affected by the construction and operation of Hungry Horse Dam. This plan only addresses non-operational actions (mitigation measures that do not affect dam operation) described in the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' (Mitigation Plan) submitted to the Northwest Power Planning Council (Council) in March 1991 and in accordance with subsequent Council action on that Mitigation Plan. Operational mitigation was deferred for consideration under the Columbia Basin System Operation Review (SOR) process. This document represents an implementation plan considered and conditionally approved by the Council in March of 1993.

  1. Strategic Planning for Information Systems: The Evidence from a Successful Implementation in an Academic Setting.

    ERIC Educational Resources Information Center

    Carter, Richard B.; And Others

    1991-01-01

    Demonstrates how an information systems plan can be successfully developed and implemented within an academic setting. Six guidelines for information systems planning are provided; problems are identified and recommendations to address the problems are suggested; and information systems objectives are discussed, including business communications,…

  2. 40 CFR 93.120 - Consequences of control strategy implementation plan failures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... implementation plan failures. 93.120 Section 93.120 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Projects Developed, Funded or Approved Under Title 23 U.S.C. or the Federal Transit Laws § 93.120... new transportation plan, TIP, or project may be found to conform until another control...

  3. 40 CFR 93.120 - Consequences of control strategy implementation plan failures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... implementation plan failures. 93.120 Section 93.120 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Projects Developed, Funded or Approved Under Title 23 U.S.C. or the Federal Transit Laws § 93.120... new transportation plan, TIP, or project may be found to conform until another control...

  4. Characteristics of Teacher Participation in Curriculum Planning and Reported Acts of Implementation.

    ERIC Educational Resources Information Center

    Kardas, Barbara J.; Talmage, Harriet

    A study was designed to identify and examine the relationship between selected characteristics of teacher participation in curriculum planning activities and reported acts of implementation. Subjects were 100 elementary teachers (K-8) who had participated in curriculum planning activities in 27 schools in nine school districts in suburban Chicago.…

  5. 77 FR 41343 - Approval and Promulgation of Implementation Plans; North Dakota: Prevention of Significant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-13

    ... as those specified by EPA in the ``PSD and Title V Greenhouse Gas Tailoring Final Rule'' (75 FR 31514... Concerning Greenhouse Gas Emitting-Sources in State Implementation Plans; Final Rule.'' 75 FR 82536 (December... Plan Revisions Required for Greenhouse Gases,'' 75 FR 81874 (December 29, 2010); ``Action To...

  6. 40 CFR 52.2453 - Requirements for state implementation plan revisions relating to new motor vehicles.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... PLANS (CONTINUED) Virginia § 52.2453 Requirements for state implementation plan revisions relating to new motor vehicles. Virginia must comply with the requirements of § 51.120 with respect to the portion of Virginia that in 1990 was located in the Consolidated Metropolitan Statistical Area containing...

  7. Implementing Governance for a New Era: An Action Plan for Higher Education Trustees

    ERIC Educational Resources Information Center

    American Council of Trustees and Alumni, 2014

    2014-01-01

    "Implementing Governance for a New Era" is an action plan to assist college and university trustees in reforming higher education. Delivered to more than 16,000 college and university trustees in November 2014, the plan provides details on how trustees properly represent the public by ensuring students receive a quality education at a…

  8. What is the Cost of Planning and Implementing Early College High School?

    ERIC Educational Resources Information Center

    Webb, Michael

    2004-01-01

    In 2003, the Early College High School (ECHS) Finance Working Group undertook to determine the costs of planning and implementing early college high schools. This pilot study, reporting on that research, is based on actual budgets developed for current and planned early college high schools. Six budgets are included: three for schools on a public…

  9. 78 FR 34303 - Approval and Promulgation of Implementation Plans; North Carolina; Removal of Stage II Gasoline...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-07

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; North Carolina; Removal of Stage... redesignation requests and the maintenance plans for the Charlotte-Gastonia Area on July 5, 1995 (60 FR 34859), Greensboro- Winston-Salem-High Point Area on September 9, 1993 (58 FR 47391), and the Raleigh-Durham Area...

  10. Practical Team-Based Learning from Planning to Implementation

    PubMed Central

    Bell, Edward; Eng, Marty; Fuentes, David G.; Helms, Kristen L.; Maki, Erik D.; Vyas, Deepti

    2015-01-01

    Team-based learning (TBL) helps instructors develop an active teaching approach for the classroom through group work. The TBL infrastructure engages students in the learning process through the Readiness Assessment Process, problem-solving through team discussions, and peer feedback to ensure accountability. This manuscript describes the benefits and barriers of TBL, and the tools necessary for developing, implementing, and critically evaluating the technique within coursework in a user-friendly method. Specifically, the manuscript describes the processes underpinning effective TBL development, preparation, implementation, assessment, and evaluation, as well as practical techniques and advice from authors’ classroom experiences. The paper also highlights published articles in the area of TBL in education, with a focus on pharmacy education. PMID:26889061

  11. Practical Team-Based Learning from Planning to Implementation.

    PubMed

    Whitley, Heather P; Bell, Edward; Eng, Marty; Fuentes, David G; Helms, Kristen L; Maki, Erik D; Vyas, Deepti

    2015-12-25

    Team-based learning (TBL) helps instructors develop an active teaching approach for the classroom through group work. The TBL infrastructure engages students in the learning process through the Readiness Assessment Process, problem-solving through team discussions, and peer feedback to ensure accountability. This manuscript describes the benefits and barriers of TBL, and the tools necessary for developing, implementing, and critically evaluating the technique within coursework in a user-friendly method. Specifically, the manuscript describes the processes underpinning effective TBL development, preparation, implementation, assessment, and evaluation, as well as practical techniques and advice from authors' classroom experiences. The paper also highlights published articles in the area of TBL in education, with a focus on pharmacy education. PMID:26889061

  12. Faculty internships in environmental health: planning and implementation.

    PubMed

    Bermúdez, Eliezer

    2005-12-01

    Faculty internships, in which a faculty member works temporarily for a government organization or a private business, are a concept that is becoming popular at universities. This paper discusses how a faculty internship can be developed and implemented, and it reports on the advantages of the internship for academia, the sponsoring institution, and the professor. In addition, suggestions on structuring and implementing the internship are offered. The major objective of the paper is to encourage environmental health educators to seriously consider faculty internships as a means of bridging the gaps between academia and the business world. Faculty internships should be beneficial primarily for two groups of professors. First are those professors who, after earning doctorates, enter the teaching profession without any environmental health practicum experience. Second are those who once worked full time as environmental health practitioners but have been out of the field for a significant number of years with little or no contact with the "real world" of environmental health practice. The information presented is based on the experience of the author, who served as a faculty intern for the environmental health division of a county health department in rural west-central Indiana, Some of the benefits of faculty internships are improved teaching methods, practical experience, community contacts, and increased internship opportunities for students. The experience can enhance classroom theory for students, and the implementation of practice can be clarified for the educator.

  13. 77 FR 24845 - Approval and Promulgation of Implementation Plans; South Dakota; Regional Haze State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-26

    .... The initials SCR mean or refer to selective catalytic reduction. The initials SIP mean or refer to State Implementation Plan. The initials SNCR mean or refer to selective non-catalytic reduction. The... the first implementation period (through 2018). 76 FR 76646. A detailed explanation of the...

  14. 75 FR 45082 - Revisions to the California State Implementation Plan, Santa Barbara County Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-02

    ... Air Pollution Control District (SBCAPCD) portion of the California State Implementation Plan (SIP... Preamble for the Implementation of Title I of the Clean Air Act Amendments of 1990'', 57 FR 13498, April 16... Environmental protection, Air pollution control, Intergovernmental relations, Nitrogen dioxide, Ozone,...

  15. Readiness and Success: Statewide Implementation of EXPLORE and PLAN. Issues in College Readiness

    ERIC Educational Resources Information Center

    ACT, Inc., 2009

    2009-01-01

    States are increasingly implementing college readiness assessments as part of statewide efforts to increase student awareness of, preparation for, and access to higher education. This brief outlines the long-term impact and benefits of statewide implementation of EXPLORE[R] and PLAN[R], two elements of the longitudinal-assessment program within…

  16. 78 FR 49684 - Approval and Disapproval of Air Quality State Implementation Plans; Arizona; Regional Haze and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-15

    ... INFORMATION: In Federal Register document 2013-18022 published in the Federal Register on July 30, 2013 (78 FR...; Regional Haze and Interstate Transport Requirements AGENCY: Environmental Protection Agency (EPA). ACTION... of Arizona's State Implementation Plan (SIP) to implement the regional haze program for the...

  17. 76 FR 78829 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-20

    ... Approved FR citation 2005 New Source Review for 05/06/2005 10/20/2005 08/29/2006, 71 FR RECLAIM. 51120 C... Preamble for the Implementation of Title I of the Clean Air Act Amendments of 1990,'' 57 FR 13498 (April 16, 1992); 57 FR 18070 (April 28, 1992). 2. ``State Implementation Plans; Nitrogen Oxides Supplement to...

  18. PC-based Multiple Information System Interface (PC/MISI) detailed design and implementation plan

    NASA Technical Reports Server (NTRS)

    Dominick, Wayne D. (Editor); Hall, Philip P.

    1985-01-01

    The design plan for the personal computer multiple information system interface (PC/MISI) project is discussed. The document is intended to be used as a blueprint for the implementation of the system. Each component is described in the detail necessary to allow programmers to implement the system. A description of the system data flow and system file structures is given.

  19. Exploring the Influence of New Technology Planning and Implementation on the Perceptions of New Technology Effectiveness

    ERIC Educational Resources Information Center

    Bellamy, Al

    2007-01-01

    This study explored influences that perceptions of new technology implementation and planning processes, and dimensions of organizational climate have on perceptions of new technology deployment effectiveness. It also examined the extent to which dimensions of organizational climate moderates the relationships among new technology implementation,…

  20. 40 CFR 763.123 - May a State implement its own asbestos worker protection plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 31 2014-07-01 2014-07-01 false May a State implement its own asbestos... (CONTINUED) TOXIC SUBSTANCES CONTROL ACT ASBESTOS Asbestos Worker Protection § 763.123 May a State implement its own asbestos worker protection plan? This section describes the process under which a State may...

  1. 40 CFR 763.123 - May a State implement its own asbestos worker protection plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 31 2011-07-01 2011-07-01 false May a State implement its own asbestos... (CONTINUED) TOXIC SUBSTANCES CONTROL ACT ASBESTOS Asbestos Worker Protection § 763.123 May a State implement its own asbestos worker protection plan? This section describes the process under which a State may...

  2. 40 CFR 763.123 - May a State implement its own asbestos worker protection plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 32 2012-07-01 2012-07-01 false May a State implement its own asbestos... (CONTINUED) TOXIC SUBSTANCES CONTROL ACT ASBESTOS Asbestos Worker Protection § 763.123 May a State implement its own asbestos worker protection plan? This section describes the process under which a State may...

  3. 40 CFR 763.123 - May a State implement its own asbestos worker protection plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 32 2013-07-01 2013-07-01 false May a State implement its own asbestos... (CONTINUED) TOXIC SUBSTANCES CONTROL ACT ASBESTOS Asbestos Worker Protection § 763.123 May a State implement its own asbestos worker protection plan? This section describes the process under which a State may...

  4. 75 FR 27510 - Approval and Promulgation of Air Quality Implementation Plans; State of West Virginia; Section...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-17

    ... October 17, 2006 (71 FR 61144). Section 110(a) of the CAA requires States to submit State Implementation..., 2005 (70 FR 21147). Therefore, this action does not cover these specific elements. II. Summary of State... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; State of...

  5. Assessing Implementation of a Performance Pay Plan for Teachers: Strategies, Findings and Implications.

    ERIC Educational Resources Information Center

    Hall, Gene E.; Caffarella, Edward; Bartlett, Ellen

    This paper reports how one school district has successfully implemented a major innovation, the Performance Pay Plan (PPP) for Teachers, and how they have collaborated with change process researchers to assess implementation. The paper emphasizes: the community-wide process of involvement and trust building used by the district to launch and…

  6. Internal marketing within a health care organization: developing an implementation plan.

    PubMed

    Hallums, A

    1994-05-01

    This paper discusses how the concept of internal marketing can be applied within a health care organization. In order to achieve a market orientation an organization must identify the needs and wants of its customers and how these may change in the future. In order to achieve this, internal marketing is a necessary step to the implementation of the organizations marketing strategy. An outline plan for the introduction of an internal marketing programme within an acute hospital trust is proposed. The plan identifies those individuals and departments who should be involved in the planning and implementation of the programme. The benefits of internal marketing to the Trust are also considered.

  7. Framing the implementation process of video conferencing in discharge planning-According to staff experience.

    PubMed

    Hofflander, Malin; Nilsson, Lina; Eriksén, Sara; Borg, Christel

    2016-01-01

    Challenges of improving discharge planning have been an area of concern for many years, including problems related to the lack of time for professionals to participate. In a county in South East Sweden, video conferencing was implemented in discharge planning sessions to enable distance participation of the professionals. To examine the implementation process, interviews were conducted with the implementers, who were project leaders, discharge planning coordinators in the hospital, and in home-care. The interviews were analyzed qualitatively, using directed content analysis with a deductive approach to a theoretical framework that was composed from theories about implementation processes to be suitable for the healthcare sector, consisting of the factors: implementation objects; implementation actions; actors; users; inner context and outer context. The results of this study are consistent with the framework but with the addition of a new dimension-time, i.e. time to prepare; time to understand; time to run through and time to reflect. It is suggested that implementation frameworks are useful when IT is introduced in healthcare. Framing the implementation process supports the exposure of factors and highlights relationships and states of dependence between those factors which may affect implementation.

  8. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1993.

    SciTech Connect

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1992-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Annual Implementation World Plan (AIWP) presents BPA`s plans for implementing the Program during fiscal year (FY) 1993. The FY 1993 AIWP emphasizes continuation of 143 ongoing or projecting ongoing Program projects, tasks, or task orders, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. The FY 1993 AIWP also contains three new Program projects or tasks that are planned to start in FY 1993.

  9. Global Precipitation Measurement (GPM) Ground Validation (GV) Science Implementation Plan

    NASA Technical Reports Server (NTRS)

    Petersen, Walter A.; Hou, Arthur Y.

    2008-01-01

    For pre-launch algorithm development and post-launch product evaluation Global Precipitation Measurement (GPM) Ground Validation (GV) goes beyond direct comparisons of surface rain rates between ground and satellite measurements to provide the means for improving retrieval algorithms and model applications.Three approaches to GPM GV include direct statistical validation (at the surface), precipitation physics validation (in a vertical columns), and integrated science validation (4-dimensional). These three approaches support five themes: core satellite error characterization; constellation satellites validation; development of physical models of snow, cloud water, and mixed phase; development of cloud-resolving model (CRM) and land-surface models to bridge observations and algorithms; and, development of coupled CRM-land surface modeling for basin-scale water budget studies and natural hazard prediction. This presentation describes the implementation of these approaches.

  10. The Planning and Implementation of Test Facility Improvements

    NASA Technical Reports Server (NTRS)

    Oberlander, Larry

    2008-01-01

    As engineering programs develop, and product testing begins, ideas for process improvement soon become obvious. Engineers envision new holding and handling fixtures. Additional custom-made support equipment may be needed. Perhaps modifications to the building or modifications to facility hardware are the order of the day. This is where a flexible creative test organization is needed. We need not be content with the status quo. All of these desired test innovations can make the difficult easy and improve the work flow. At times, implementing these new ideas demands more time or specialized expertise than test team members have. Through the coordinated use of labor resources, the needed improvements can still be made and in a timely fashion that supports program schedules. This presentation provides practical advice and a method whereby test personnel can creatively develop facility improvements and manage them from start to finish. You can control just how much time you invest and what part of your concepts you will personally design. By wisely defining the requirements and presenting them to the appropriate help sources (vendors, contractors, coworkers, and support departments), you can get the help you need to bring the improvements you have conceived, into fruition. Aspects of this presentation include defining requirements for test facility improvements, choosing labor resources, writing a statement of work, determining cost and benefits, securing department approval, coordinating procurement, managing the project, and training the end users. The process of successfully implementing test facility improvements is thoroughly explained. It has been tried, proven and improved over nearly 25 years of use. Whether considering a $50 improvement or a $50 million dollar improvement, this discussion will provide helpful pointers. Examples of improvements made through this process and their illustration will be included.

  11. Web survey data collection and retrieval to plan teleradiology implementation

    NASA Astrophysics Data System (ADS)

    Alaoui, Adil; Collmann, Jeff R.; Johnson, Jeffrey A.; Lindisch, David; Nguyen, Dan; Mun, Seong K.

    2003-05-01

    This case study details the experience of system engineers of the Imaging Science and Information Systems Center, Georgetown University Medical Center (ISIS) and radiologists from the department of Radiology in the implementation of a new Teleradiology system. The Teleradiology system enables radiologists to view medical images from remote sites under those circumstances where a resident radiologist needs assistance in evaluating the images after hours and during weekends; it also enables clinicians access to patients" medical images from different workstations within the hospital. The Implementation of the Teleradiology project was preceded by an evaluation phase to perform testing, gather users feedback using a web site and collect information that helped eliminate system bugs, complete recommendations regarding minimum hardware configuration and bandwidth and enhance system"s functions, this phase included a survey-based system assessment of computer configurations, Internet connections, problem identification, and recommendations for improvement, and a testing period with 2 radiologists and ISIS engineers; The second phase was designed to launch the system and make it available to all attending radiologists in the department. To accomplish the first phase of the project a web site was designed and ASP pages were created to enable users to securely logon and enter feedback and recommendations into an SQL database. This efficient, accurate data flow alleviated networking, software and hardware problems. Corrective recommendations were immediately forwarded to the software vendor. The vendor responded with software updates that better met the needs of the radiologists. The ISIS Center completed recommendations for minimum hardware and bandwidth requirements. This experience illustrates that the approach used in collecting the data and facilitating the teamwork between the system engineers and radiologists was instrumental in the project"s success. Major problems

  12. 75 FR 20780 - Approval and Promulgation of Implementation Plans; Revisions to the Kentucky State Implementation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-21

    ... Plan (SIP) submitted by the Commonwealth of Kentucky, through the Kentucky Energy and Environment... the Clean Air Act (CAA). DATES: Effective Date: This rule will be effective May 21, 2010. ADDRESSES... found in the proposed rulemaking notice (74 FR 63697). EPA is finalizing the approval as proposed...

  13. Implementation Plan for the NASA Center of Excellence for Structures and Materials

    NASA Technical Reports Server (NTRS)

    Harris, Charles E. (Editor)

    1998-01-01

    This report presents the implementation plans of the Center of Excellence (COE) for Structures and Materials. The plan documented herein is the result of an Agencywide planning activity led by the Office of the Center of Excellence for Structures and Materials at Langley Research Center (LaRC). The COE Leadership Team, with a representative from each NASA Field Center, was established to assist LaRC in fulfilling the responsibilities of the COE. The Leadership Team developed the plan presented in this report.

  14. Implementing Strategic Planning Capabilities Within the Mars Relay Operations Service

    NASA Technical Reports Server (NTRS)

    Hy, Franklin; Gladden, Roy; Allard, Dan; Wallick, Michael

    2011-01-01

    Since the Mars Exploration Rovers (MER), Spirit and Opportunity, began their travels across the Martian surface in January of 2004, orbiting spacecraft such as the Mars 2001 Odyssey orbiter have relayed the majority of their collected scientific and operational data to and from Earth. From the beginning of those missions, it was evident that using orbiters to relay data to and from the surface of Mars was a vastly more efficient communications strategy in terms of power consumption and bandwidth compared to direct-to-Earth means. However, the coordination between the various spacecraft, which are largely managed independently and on differing commanding timelines, has always proven to be a challenge. Until recently, the ground operators of all these spacecraft have coordinated the movement of data through this network using a collection of ad hoc human interfaces and various, independent software tools. The Mars Relay Operations Service (MaROS) has been developed to manage the evolving needs of the Mars relay network, and specifically to standardize and integrate the relay planning and coordination data into a centralized infrastructure. This paper explores the journey of developing the MaROS system, from inception to delivery and acceptance by the Mars mission users.

  15. [Planning, implementation and evaluation of cancer screening programs].

    PubMed

    Giersiepen, Klaus; Hense, Hans-Werner; Klug, Stefanie J; Antes, Gerd; Zeeb, Hajo

    2007-01-01

    Members of the Cancer Epidemiology Work Group within the German Epidemiology Society and Dr Antes of the German Cochrane Center will present a review of the epidemiological aspects of cancer screening programs. Prior to the implementation of a cancer screening program, there should be clear evidence from randomized controlled trials showing a disease-specific mortality reduction by screening. For target entities with the potential to reduce incident invasive cancers- such as cervical and colorectal cancer - the search of evidence should also include cancer incidence reduction. Monitoring of the screening program is essential and should include: the test, the assessment of test-positives, therapy or other interventions, and a cause of death evaluation. It is important to show that the benefit of a mortality reduction is not outweighed by adverse screening effects. In the past, German cancer screening activities were lacking essential components of screening programs like a central unit inviting the target population, standardized documentation and reporting as well as independent audits. The new Mammography Screening Program for the first time offers a screening test in Germany that is embedded in a quality monitoring program evaluating at least intermediate outcome parameters.

  16. Urban family physician plan in Iran: challenges of implementation in Kerman

    PubMed Central

    Dehnavieh, Reza; Kalantari, Ali Reza; Jafari Sirizi, Mohammad

    2015-01-01

    Background: The Family Physician Plan has recently been implemented in three provinces of Iran on a pilot basis and is going to be implemented throughout Iran in the future. Through a qualitative design, this study aims to determine probable implementation challenges of Family Physician Plan in Kerman. Methods: This study was conducted in Kerman in 2013. Data were collected through interviews with 21 experts in the field. Sampling continued until data saturation level was achieved. All interviews were recorded and then analyzed, and main themes and subgroups were extracted from them based on a framework analysis model. Results: most prevalent establishment challenges of Family Physician Plan were classified into policy-making, financial supply, laws and resources. Conclusion: The urban Family Physician Plan can be carried out more effectively by implementing this plan step by step, highlighting the relationships between the related organizations, using new payment mechanisms e.g Per Capita, DRG, make national commitment and proper educational programs for providers, development the health electronic Record, justifying providers and community about advantages of this plan, clarifying regulatory status about providers' Duties and most importantly considering a specific funding source. PMID:26913266

  17. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1989.

    SciTech Connect

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1988-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501. the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operation of hydroelectric generation in the Columbia River Basin. This document presents BPA's plans for implementing the Program during Fiscal Year (FY) 1989. BPA's Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, BPA's Work Plan provides a means to judge progress and the success of Program implementation. This Work Plan has been organized and written to meet the specific needs of the Council's Action Plan, as described in Action Items 10.1-10.3 of the Program. The Work Plan includes schedules with key milestones for FY 1989 and beyond, and is organized to address the Action Items assigned to BPA in Section 1400 of the 1987 Program. All BPA-funded projects discussed in the FY 1989 Work Plan are listed in Tables 1 and 2 according to their current status. Table 1 (pp. 3-11) lists completed, ongoing, and deferred projects. Table 2 (pp. 12-13) lists all projects which BPA plans to fund as ''new'' projects in FY 1989. ''Ongoing'' status indicates that the project started in FY 1988 or before, and that it was still being implemented by BPA at the end of FY 1988. ''Deferred'' means that BPA implementation has been postponed to FY 1990 or later. ''Completed

  18. Using Implementation Planning to Increase Teachers' Adherence and Quality to Behavior Support Plans

    ERIC Educational Resources Information Center

    Sanetti, Lisa M. Hagermoser; Collier-Meek, Melissa A.; Long, Anna C. J.; Kim, Jisun; Kratochwill, Thomas R.

    2014-01-01

    Evidence-based practices within a response-to-intervention framework must be implemented with adequate treatment integrity to promote student outcomes. However, research findings indicate educators struggle to implement interventions and logistical considerations may limit the utility of performance feedback, an evidence-based treatment integrity…

  19. Implementation Plan: Jasper Management Prestart Review (Surrogate Material Experiments)

    SciTech Connect

    Cooper, W.E.

    2000-09-29

    Able Site is located 24 km northwest of Mercury on the Nevada Test Site. The Nevada Test Site is approximately 105 km northwest of Las Vegas, NV. Major facilities at Able Site include Buildings 5100,5180, and 5191. Significant external interfaces for the JASPER site include the electrical system, wastewater system, communications systems, and water supply system, which provides both potable and fire-protection water. Support services, which are provided on the Nevada Test Site, include medical, emergency response (NTS Fire Department), radiation protection, industrial hygiene, and waste management. Although JASPER will ultimately be used for actinide research, the start-up process requires system demonstration using surrogates in place of the actinide targets. LLNL Nevada Experiments and Operations (N) Program has established a Management Prestart Review (MPR) team to determine the readiness of the JASPER personnel and facilities to initiate surrogate-material experiments. A second MPR will be conducted before actinide experiments are executed. This document addresses implementation requirements for only the first MPR. This first review coincides with the completion of authorization-basis documents and physical subsystems, which have undergone appropriate formal engineering design reviews. This MPR will affirm the quality of those reviews, their findings/resolutions, and will look most closely at systems integration requirements and demonstrations that will have undergone technical acceptance reviews before this formal MPR action. Closure of MPR findings will finalize requirements for a DOE/NV Real Estate/Operations Permit (REOP) for surrogate-material experiments. Upon completion of that experiment series and the establishment of capabilities for incorporating special nuclear material (SNM) into future experiments, the team will convene again as part of the process of authorizing those activities. A summary of the review schedule is provided.

  20. Partnerships for Policy Development: A Case Study From Uganda’s Costed Implementation Plan for Family Planning

    PubMed Central

    Lipsky, Alyson B; Gribble, James N; Cahaelen, Linda; Sharma, Suneeta

    2016-01-01

    ABSTRACT In global health, partnerships between practitioners and policy makers facilitate stakeholders in jointly addressing those issues that require multiple perspectives for developing, implementing, and evaluating plans, strategies, and programs. For family planning, costed implementation plans (CIPs) are developed through a strategic government-led consultative process that results in a detailed plan for program activities and an estimate of the funding required to achieve an established set of goals. Since 2009, many countries have developed CIPs. Conventionally, the CIP approach has not been defined with partnerships as a focal point; nevertheless, cooperation between key stakeholders is vital to CIP development and execution. Uganda launched a CIP in November 2014, thus providing an opportunity to examine the process through a partnership lens. This article describes Uganda’s CIP development process in detail, grounded in a framework for assessing partnerships, and provides the findings from 22 key informant interviews. Findings reveal strengths in Uganda’s CIP development process, such as willingness to adapt and strong senior management support. However, the evaluation also highlighted challenges, including district health officers (DHOs), who are a key group of implementers, feeling excluded from the development process. There was also a lack of planning around long-term partnership practices that could help address anticipated execution challenges. The authors recommend that future CIP development efforts use a long-term partnership strategy that fosters accountability by encompassing both the short-term goal of developing the CIP and the longer-term goal of achieving the CIP objectives. Although this study focused on Uganda’s CIP for family planning, its lessons have implications for any policy or strategy development efforts that require multiple stakeholders to ensure successful execution. PMID:27353621

  1. 94-1 Research and development project lead laboratory support. Status report, July 1, 1996--September 30, 1996

    SciTech Connect

    Rink, N.

    1997-03-01

    This document reports status and technical progress for Los Alamos 94-1 Research and Development projects. Updated schedule charts are shown in the appendix. This is the fourth status report published for Los Alamos National Laboratory 94-1 Research and Development Project Support. The Department of Energy Office of Environmental Management (DOE/EM) funds these projects in order to support the storage or disposal of legacy plutonium and plutonium-bearing materials resulting from weapons production throughout the DOE complex. This document also serves as an end-for-year review of projects and positions the program for FY97.

  2. Actor coalitions and implementation in strategic delta planning: Opening the Haringvliet sluices in the Netherlands

    NASA Astrophysics Data System (ADS)

    Vermoolen, Myrthe; Hermans, Leon

    2016-04-01

    The sustained development of urbanizing deltas is influenced by natural and societal processes. These processes are characterized by their long time span, in which conflicting interests of different stakeholders have to be reconciled. Reaching consent between actors is a challenge itself, but maintaining this consent throughout different stages of strategic planning - from advocacy and agenda setting to implementation - over these long periods of time is even more difficult. The implementation stage still includes many different actors involved, some of which are different than the ones who agreed before, due to both the long run of the strategic delta planning, and to a shift of tasks and responsibilities. Thus, implementation of strategic plans often features delays, deviations of agreed plans and unintended outcomes. A key question therefore is how coalition dynamics in (pre-)planning stages influence and are influenced by the coalition dynamics during implementation. The different stages in strategic planning are often studied from either a plan formulation or an implementation perspective, but the connection between the two proves an important bottleneck for strategic planning in deltas. For instance, many building with nature solutions are still in their pilot-phase, and their upscaling can profit from lessons concerning past implementation efforts. The proposed contribution will use the case of the management of the Dutch Haringvliet sluices and the decision ('Kierbesluit') in 2000 to put these sluices ajar, to study the link between the different strategic delta planning stages and the role of the formation and change of actor coalitions herein. With the completion of the Haringvliet dam with outlet sluices in 1970, the Haringvliet estuary of the rivers Rhine and Meuse was closed off from the sea, creating a fresh water lake. This was done to make the Dutch Southwest delta safe from flooding, and had positive effects for agricultural water supply and

  3. The Vanderbilt University fast track to IAIMS: transition from planning to implementation.

    PubMed Central

    Stead, W W; Borden, R; Bourne, J; Giuse, D; Giuse, N; Harris, T R; Miller, R A; Olsen, A J

    1996-01-01

    Vanderbilt University Medical Center is implementing an Integrated Advanced Information Management System (IAIMS) using a fast-track approach. The elapsed time between start-up and completion of implementation will be 7.5 years. The Start-Up and Planning phases of the project are complete. The Implementation phase asks one question: How does an organization create an environment that redirects and coordinates a variety of individual activities so that they come together to provide an IAIMS? Four answers to this question are being tested. First, design resources to be "scalable"--i.e., capable of supporting enterprise-wide use. Second, provide information technology planning activities as ongoing core functions that direct local efforts. Third, design core infrastructure resources to be both reusable and expandable at the local level. Fourth, use milestones to measure progress toward selected endpoints to permit early refinement of plans and strategies. PMID:8880678

  4. An Assessment of the Implementation of National Development Plans in Kenya: The Case of Education Sector Programmes

    ERIC Educational Resources Information Center

    Gor, Seth Omondi; Osoro, Kennedy O.

    2013-01-01

    This study assessed the success or failure of plan implementation in Kenya by investigating the extent to which planned estimates for educational projects were actually attained. Using six sets of five-year national development plans, we calculated an implementation ratio for each program showing actual expenditure as a ratio of planned…

  5. Lessons learned from the Hubble Space Telescope planning and scheduling system implementation and operation

    NASA Technical Reports Server (NTRS)

    Ruitberg, Edward O.; Ondrus, Paul J.

    1990-01-01

    The major challenge of the NASA Hubble Space Telescope (HST) Ground System has been the implementation of the planning and scheduling system. This paper describes the operational flow of HST from science proposals to the actual execution of science observations on board the HST. The paper provides a collection of lessons learned over the 10 years that have covered the definition, development, test, and initial operation of HST's planning and scheduling system.

  6. An implementation plan for priorities in solar-system space physics

    NASA Technical Reports Server (NTRS)

    Krimigis, Stamatios M.; Athay, R. Grant; Baker, Daniel; Fisk, Lennard A.; Fredricks, Robert W.; Harvey, John W.; Jokipii, Jack R.; Kivelson, Margaret; Mendillo, Michael; Nagy, Andrew F.

    1985-01-01

    The scientific objectives and implementation plans and priorities of the Space Science Board in areas of solar physics, heliospheric physics, magnetospheric physics, upper atmosphere physics, solar-terrestrial coupling, and comparative planetary studies are discussed and recommended programs are summarized. Accomplishments of Skylab, Solar Maximum Mission, Nimbus-7, and 11 other programs are highlighted. Detailed mission plans in areas of solar and heliospheric physics, plasma physics, and upper atmospheric physics are also described.

  7. Systems engineering management and implementation plan for Project W-464, immobilized high-level waste storage

    SciTech Connect

    Wecks, M.D.

    1998-04-15

    The Systems Engineering Management and Implementation Plan (SEMIP) for TWRS Project W-46 describes the project implementation of the Tank Waste Remediation System Systems Engineering Management Plan. (TWRS SEMP), Rev. 1. The SEMIP outlines systems engineering (SE) products and processes to be used by the project for technical baseline development. A formal graded approach is used to determine the products necessary for requirements, design, and operational baseline completion. SE management processes are defined, and roles and responsibilities for management processes and major technical baseline elements are documented.

  8. Tank waste remediation system immobilized high-level waste storage project configuration management implementation plan

    SciTech Connect

    Burgard, K.G.

    1998-09-24

    This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.

  9. Risk assessment for enterprise resource planning (ERP) system implementations: a fault tree analysis approach

    NASA Astrophysics Data System (ADS)

    Zeng, Yajun; Skibniewski, Miroslaw J.

    2013-08-01

    Enterprise resource planning (ERP) system implementations are often characterised with large capital outlay, long implementation duration, and high risk of failure. In order to avoid ERP implementation failure and realise the benefits of the system, sound risk management is the key. This paper proposes a probabilistic risk assessment approach for ERP system implementation projects based on fault tree analysis, which models the relationship between ERP system components and specific risk factors. Unlike traditional risk management approaches that have been mostly focused on meeting project budget and schedule objectives, the proposed approach intends to address the risks that may cause ERP system usage failure. The approach can be used to identify the root causes of ERP system implementation usage failure and quantify the impact of critical component failures or critical risk events in the implementation process.

  10. 78 FR 77592 - Safety Zone; Lower Mississippi River Mile 94.1-Mile 95.1; New Orleans, LA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-24

    ... SECURITY Coast Guard 33 CFR Part 165 RIN 1625-AA00 Safety Zone; Lower Mississippi River Mile 94.1-Mile 95.1; New Orleans, LA AGENCY: Coast Guard, DHS. ACTION: Temporary final rule. SUMMARY: The Coast Guard is... Information The Coast Guard is issuing this final rule without prior notice and opportunity to...

  11. 94-1 Research and development project lead laboratory support. Status report, January 1--March 31, 1996

    SciTech Connect

    Dinehart, M.

    1996-09-01

    This document reports status and technical progress for Los Alamos National Laboratories 94-1 Research and Development projects. An introduction to the project structure and an executive summary are included. Projects described include Electrolytic Decontamination, Combustibles, Detox, Sand, Slag, and Crucible, Surveillance, and Core Technology.

  12. Stabilizing plutonium materials at Hanford: systems engineering for PFP transition project effort on DNFSB 94-1

    SciTech Connect

    Huber, T.E., Westinghouse Hanford

    1996-07-02

    This report discusses the basic objectives of the stabilization and packaging activities at the Plutonium Finishing Plant that satisfy the Defense Nuclear Facility Safety Board Recommendation 94-1 by transforming the plutonium materials at hanford into forms or conditions which are suitable for safe storage to appropriate storage criteria; or discard that meets appropriate waste acceptance criteria.

  13. Plans for Implementing the Columbia River Basin Fish and Wildlife Program in Fiscal Year 1986.

    SciTech Connect

    United States. Bonneville Power Administration

    1985-10-01

    The Fish and Wildlife Program is an effort to enhance, protect, and mitigate losses of those fish and wildlife which have been affected by the development, operation, and management of hydroelectric facilities in the Columbia River Basin. The implementation plan is organized to address the action items assigned to BPA in Section 1500 of the Council's Fish and Wildlife Program (1984). These action items generally relate to one or more specific measures in the Program. The following information is listed for each project: budget summary, projects, obligation plan, and work plan and milestones.

  14. Environmental Monitoring and Assessment Program: Surface waters implementation plan - Northeast Pilot Lake Survey, Summer 1991

    SciTech Connect

    Pollard, J.E.; Perez, K.M.

    1991-06-01

    The document outlines the proposed implementation plan for the Environmental Monitoring and Assessment Program's Surface Waters Northeast Lakes Pilot Survey, to be conducted from July through September, 1991. The plan outlines the objectives of the field pilot activities and the questions which the authors expect to answer as a result of these activities. In addition, the plan contains a description of the indicators, the measurement variables included in each indicator, the design rationale, and details including site selection criteria and a list of selected sites. Very brief descriptions of quality assurance, logistical considerations, and the information management approach are also presented.

  15. 77 FR 16447 - Approval and Promulgation of Implementation Plans; Designation of Areas for Air Quality Planning...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-21

    ... final rule (68 FR at 57821 and 57824) redesignating certain air quality planning area boundaries in... published on February 17, 2012 at 77 FR 9532, at 9540, effective February 29, 2012. The table heading... are located within the State of California. On April 30, 2004, at 69 FR 23858, we published a...

  16. 78 FR 57573 - Approval and Promulgation of Air Quality Implementation Plans; Delaware; Attainment Plan for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-19

    ... X emission control, New Castle County (effective June 2012). SIP approved May 5, 2012 (77 FR 28489... Plan for the Philadelphia-Wilmington, Pennsylvania-New Jersey-Delaware Nonattainment Area for the 1997... standard (NAAQS) for the Philadelphia-Wilmington, Pennsylvania-New Jersey-Delaware (PA-NJ- DE) PM...

  17. 76 FR 67640 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Attainment Plan for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-02

    ... representation of weather conditions at the surface and aloft. e. Domain of the Model, Horizontal/Vertical..., Associate Director, Office of Air Planning Program, Mailcode 3AP30, U.S. Environmental Protection Agency... is not publicly available, i.e., CBI or other information whose disclosure is restricted by...

  18. 76 FR 17801 - Approval and Promulgation of Implementation Plans; New York Reasonable Further Progress Plans...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-31

    ... individuals with a pre-existing respiratory disease, such as asthma. On April 30, 2004 (69 FR 23951), EPA... Poughkeepsie nonattainment area is composed of Dutchess, Orange and Putnam counties. On March 25, 2008 (73 FR... implementation rule, published on April 30, 2004 (69 FR 23951) and referred to as the Phase 1 Rule,...

  19. 77 FR 69399 - Approval and Promulgation of Air Quality Implementation Plans; Delaware; Attainment Plan for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-19

    ... the CAA, as described in the PM 2.5 Implementation Rule published on April 25, 2007 (72 FR 20586). EPA... 98th percentile of 24- hour concentrations. See 62 FR 38652 (July 18, 1997). EPA established these..., established a complete set of air quality monitors. On January 5, 2005 (70 FR 944), EPA promulgated...

  20. 77 FR 21663 - Air Quality Implementation Plans; Kentucky; Attainment Plan for the Kentucky Portion of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-11

    ... action (see 75 FR 4510). Section III of this rulemaking responds to the adverse comments received on EPA... published the PM 2.5 Implementation Rule for the 1997 PM 2.5 NAAQS (72 FR 20586). This rule describes the....5 NAAQS. See 76 FR 55542. That determination was based on the most recent three years of...