Sample records for aashto lrfd bridge

  1. Correlation of shear design between AASHTO LRFD bridge design specifications and AASHTO Guide Specifications for the LRFD Seismic Bridge Design.

    DOT National Transportation Integrated Search

    2017-01-05

    This report presents the analytical study of the shear capacity of reinforced concrete columns using both the AASHTO LRFD Bridge Design Specifications and the AASHTO Guide Specifications for the LRFD Seismic Bridge Design. The study investigates vari...

  2. Synthesis and evaluation of lightweight concrete research relevant to the AASHTO LRFD bridge design specifications : potential revisions for definition and mechanical properties.

    DOT National Transportation Integrated Search

    2012-11-01

    Much of the fundamental basis for the current lightweight concrete provisions in the AASHTO LRFD Bridge : Design Specifications is based on research of lightweight concrete (LWC) from the 1960s. The LWC that was : part of this research used tradition...

  3. Software for AASHTO LRFD combined shear and torsion computations using modified compression field theory and 3D truss analogy.

    DOT National Transportation Integrated Search

    2011-10-01

    The shear provisions of the AASHTO LRFD Bridge Design Specifications (2008), as well as the simplified : AASHTO procedure for prestressed and non-prestressed reinforced concrete members were investigated and compared : to their equivalent ACI 318-08 ...

  4. Synthesis and evaluation of lightweight concrete research relevant to the AASHTO LRFD bridge design specifications : identification of articles for further evaluation and potential revision.

    DOT National Transportation Integrated Search

    2012-11-01

    Much of the fundamental basis for the current lightweight concrete provisions in the AASHTO LRFD Bridge : Design Specifications is based on research of lightweight concrete (LWC) from the 1960s. The LWC that was : part of this research used tradition...

  5. Software for AASHTO LRFD combined shear and torsion computations using modified compression field theory and 3D truss analogy : technical summary.

    DOT National Transportation Integrated Search

    2011-10-01

    The shear provisions of the AASHTO LRFD Bridge Design Specifications (2008), as well as the simplified AASHTO procedure for prestressed and non-prestressed reinforced concrete members were investigated and compared to their equivalent ACI 318-08 prov...

  6. The impact of the AASHTO LRFD design code on bridge stiffness and strength : Part 1 : methods and design comparisons.

    DOT National Transportation Integrated Search

    2007-01-01

    The Commonwealth of Virginia is currently transitioning from the long-used AASHTO Allowable Stress Design (ASD) specification to AASHTO's Load and Resistance Factor Design (LRFD) specification. The new specification features revised live loads, more ...

  7. Designing timber highway bridge superstructures using AASHTO?LRFD specifications

    Treesearch

    James P. Wacker; James S. Groenier

    2007-01-01

    The allowable-stress design methodology that has been used for decades to design timber bridge superstructures is being replaced in the near future. Beginning in October 2007, bridge designers will be required by the Federal Highway Administration (FHWA) to utilize the Load and Resistance Factor Design (LRFD) design specifications published by the American Association...

  8. Influence of the new LRFD seismic guidelines on the design of bridges in Virginia.

    DOT National Transportation Integrated Search

    2004-01-01

    The Virginia Department of Transportation is currently using the AASHTO Standard Specifications for Highway Bridges, with some modifications, for its seismic highway bridge design. In April 2001, the Recommended LRFD Guidelines for the Seismic Design...

  9. Update of bridge design standards in Alabama for AASHTO LRFD seismic design requirements.

    DOT National Transportation Integrated Search

    2013-11-01

    The Alabama Department of Transportation (ALDOT) has been required to update their bridge design to the LRFD Bridge Design Specifications. This transition has resulted in changes to the seismic design standards of bridges in the state. Multiple bridg...

  10. Assessment of current AASHTO LRFD methods for static pile capacity analysis in Rhode Island soils.

    DOT National Transportation Integrated Search

    2013-07-01

    This report presents an assessment of current AASHTO LRFD methods for static pile capacity analysis in Rhode : Island soils. Current static capacity methods and associated resistance factors are based on pile load test data in sands : and clays. Some...

  11. Improved LRFD/LRFR specifications for permit and fatigue load truck.

    DOT National Transportation Integrated Search

    2011-01-01

    Bridge design and evaluation are moving toward the American Association of State Highway and Transportation : Officials (AASHTO) load and resistance factor design/load and resistance factor rating (LRFD/LRFR) : specifications using calibrated truck l...

  12. UDOT calibration of AASHTO's new prestress loss design equations.

    DOT National Transportation Integrated Search

    2009-07-01

    In the next edition of the AASHTO LRFD Bridge Design Specifications the procedure to calculate prestress losses will change dramatically. The new equations are empirically based on high performance concrete from four states (Nebraska, New Hampshire, ...

  13. UDOT's calibration of AASHTO's new prestress loss design equations.

    DOT National Transportation Integrated Search

    2009-07-01

    In the next edition of the AASHTO LRFD Bridge Design Specifications the procedure to calculate prestress losses will change dramatically. The new equations are empirically based on high performance concrete from four states (Nebraska, New Hampshire, ...

  14. Designing timber bridge superstructures : a comparison of U.S. and Canadian bridge codes.

    Treesearch

    James Scott Groenier; James P. Wacker

    2008-01-01

    Several changes relating to timber bridges have been incorporated into the AASHTO-LRFD Bridge Design Specifications recently. In addition, the Federal Highway Administration is strongly encouraging an LRFD-based design approach for all new bridges in the United States. The Bridge Design Code in Canada was one of the first to adopt the limit states design philosophy,...

  15. Comprehensive evaluation of fracture critical bridges.

    DOT National Transportation Integrated Search

    2014-02-01

    Two-girder steel bridges are classified as fracture critical bridges based on the definition given in the AASHTO LRFD Bridge Design Specifications. In a fracture critical bridge a failure of a tension member leads to collapse of the bridge. However, ...

  16. Performance and capacity assessment of reinforced concrete bridge piers considering the current load and resistance factor design provisions and plastic hinge length in Kansas.

    DOT National Transportation Integrated Search

    2014-05-01

    Kansas Department of Transportation (KDOT) has implemented the new AASHTO-LRFD provisions in the state specific : LRFD design procedure (KDOT LRFD). Most of the existing bridges constructed before the new provisions, have been designed : based on the...

  17. Evaluation of long-term prestress losses in post-tensioned box-girder bridges.

    DOT National Transportation Integrated Search

    2011-03-01

    Most of the recent highway bridges built in California have post-tensioned, cast-in-place, concrete box-girder superstructures rigidly connected to bridge columns. However, methods provided in the current (2007 and 2010) AASHTO LRFD Bridge Design Spe...

  18. Managing Florida's fracture critical bridges - phases 1 and 2 : final report.

    DOT National Transportation Integrated Search

    2016-05-01

    Based on the definition given in the AASHTO LRFD Bridge Design Specifications, twin steel box-girder bridges are : classified as bridges with fracture critical members (FCMs), in which a failure of a tension member is expected to : lead to a collapse...

  19. Multimedia package for LRFD concrete bridge design.

    DOT National Transportation Integrated Search

    2009-02-01

    This Project developed a Load and Resistance Factor Design (LRFD) multimedia package to provide a practical introduction and an in-depth understanding of the technological advances in the design of concrete bridges. This package can be used to train ...

  20. Analysis of large truck collisions with bridge piers : phase 1, report of guidelines for designing bridge piers and abutments for vehicle collisions.

    DOT National Transportation Integrated Search

    2010-05-01

    The American Association of State Highway and Transportation Officials (AASHTO) Load and : Resistance Factor Design (LRFD) Bridge Design Specifications require that abutments and piers located : within a distance of 30.0 ft of the edge of the road...

  1. Safety Identifying of Integral Abutment Bridges under Seismic and Thermal Loads

    PubMed Central

    Easazadeh Far, Narges; Barghian, Majid

    2014-01-01

    Integral abutment bridges (IABs) have many advantages over conventional bridges in terms of strength and maintenance cost. Due to the integrity of these structures uniform thermal and seismic loads are known important ones on the structure performance. Although all bridge design codes consider temperature and earthquake loads separately in their load combinations for conventional bridges, the thermal load is an “always on” load and, during the occurrence of an earthquake, these two important loads act on bridge simultaneously. Evaluating the safety level of IABs under combination of these loads becomes important. In this paper, the safety of IABs—designed by AASHTO LRFD bridge design code—under combination of thermal and seismic loads is studied. To fulfill this aim, first the target reliability indexes under seismic load have been calculated. Then, these analyses for the same bridge under combination of thermal and seismic loads have been repeated and the obtained reliability indexes are compared with target indexes. It is shown that, for an IAB designed by AASHTO LRFD, the indexes have been reduced under combined effects. So, the target level of safety during its design life is not provided and the code's load combination should be changed. PMID:25405232

  2. Statistical analysis of weigh-in-motion data for bridge design in Vermont.

    DOT National Transportation Integrated Search

    2014-10-01

    This study investigates the suitability of the HL-93 live load model recommended by AASHTO LRFD Specifications : for its use in the analysis and design of bridges in Vermont. The method of approach consists in performing a : statistical analysis of w...

  3. Geotechnical LFRD calculations of settlement and bearing capacity of GDOT shallow bridge foundations and retaining walls.

    DOT National Transportation Integrated Search

    2016-08-09

    The AASHTO codes for Load Resistance Factored Design (LRFD) regarding shallow bridge foundations : and walls have been implemented into a set of spreadsheet algorithms to facilitate the calculations of bearing : capacity and footing settlements on na...

  4. Performance and capacity assessment of reinforced concrete bridge piers considering the current load and resistance factor design provisions and plastic hinge length in Kansas : [technical summary].

    DOT National Transportation Integrated Search

    2014-05-01

    Kansas Department of Transportation (KDOT) has implemented the new AASHTO : LRFD provisions in the state specific LRFD design procedure (KDOT-LRFD). There : have been some significant updates in new version of AASHTO-LRFD (2010), compared : to previo...

  5. Appendix B : small beam tests.

    DOT National Transportation Integrated Search

    2013-03-01

    The AASHTO LRFD Bridge Design Specifications (2007) require that confinement : reinforcement be placed around prestressing strands in the bottom bulb of pretensioned concrete : beams. Although the AASHTO specifications contain prescriptive requiremen...

  6. Advanced bridge safety initiative, task 3 : slab bridge load rating using AASHTO methodology and finite element analysis - an analysis of 20 bridges.

    DOT National Transportation Integrated Search

    2011-12-01

    Current AASHTO provisions for the conventional load rating of flat slab bridges rely on the equivalent strip method : of analysis for determining live load effects, this is generally regarded as overly conservative by many professional : engineers. A...

  7. Seismic Design Considerations : Volume I, Technical Approaches and Results; Volume II, Appendices II-VIII

    DOT National Transportation Integrated Search

    2012-03-01

    NJDOT has adopted AASHTO Guide Specifications for LRFD Seismic Bridge Design approved by the Highway : Subcommittee on Bridges and Structures in 2007. The main objective of research presented in this report has : been to resolve following issue...

  8. Development of recommended resistance factors for drilled shafts in weak rocks based on o-cell tests.

    DOT National Transportation Integrated Search

    2010-03-01

    From October 1, 2007, the new bridges on federal-aid funded projects are mandated to be designed to meet : American Association of State Highway and Transportation Officials (AASHTO) Load and Resistance Factor Design : (LRFD) Bridge Design Specificat...

  9. Development of recommended resistance factors for drilled shafts in weak rocks based on o-cell tests : [technical summary].

    DOT National Transportation Integrated Search

    2010-03-01

    Since October 1st 2007, federal-funded projects including new bridges have been mandated to be designed to meet American Association of State Highway and Transportation Officials (AASHTO) Load and Resistance Factor Design (LRFD) Bridge Design Specifi...

  10. High Strength Reinforcing Steel Bars : Concrete Shear Friction Interface : final report : Part A.

    DOT National Transportation Integrated Search

    2017-03-01

    High-strength steel (HSS) reinforcement, specifically ASTM A706 Grade 80 (550), is now permitted by the AASHTO LRFD Bridge Design Specifications for use in reinforced concrete bridge components in non-seismic regions. Using Grade 80 (550) steel reinf...

  11. High strength reinforcing steel bars : concrete shear friction interface : final report : Part A.

    DOT National Transportation Integrated Search

    2017-03-01

    High-strength steel (HSS) reinforcement, specifically ASTM A706 Grade 80 (550), is now permitted by the AASHTO LRFD Bridge Design Specifications for use in reinforced concrete bridge components in non-seismic regions. Using Grade 80 (550) steel reinf...

  12. High strength reinforcing steel bars : low cycle fatigue behavior : final report - part B.

    DOT National Transportation Integrated Search

    2017-03-01

    High-strength steel (HSS) reinforcing steel, specifically ASTM A706 Grade 80 (550), is now permitted by the AASHTO LRFD Bridge Design Specifications for use in reinforced concrete bridge components in non-seismic regions. Using Grade 80 (550) reinfor...

  13. High strength reinforcing steel bars : low-cycle fatigue behavior : final report - part B.

    DOT National Transportation Integrated Search

    2017-03-01

    High-strength steel (HSS) reinforcing steel, specifically ASTM A706 Grade 80 (550), is now permitted by the AASHTO LRFD Bridge Design Specifications for use in reinforced concrete bridge components in non-seismic regions. Using Grade 80 (550) reinfor...

  14. Dynamic Load on Continuous Multi-Lane Bridge Deck from Moving Vehicles

    NASA Astrophysics Data System (ADS)

    ZHU, X. Q.; LAW, S. S.

    2002-04-01

    The dynamic loading on a multi-lane continuous bridge deck due to vehicles moving on top at a constant velocity is investigated. The bridge is modelled as a multi-span continuous orthotropic rectangular plate with line rigid intermediate supports. The vehicle is simulated as a two-axle three-dimensional vehicle model with seven degrees of freedom according to the H20-44 vehicle design loading (AASHTO LRFD Bridge Design Specifications 1998 American Association of State Highway and Transportation Officials [1]). The dynamic behavior of the bridge deck under single and several vehicles moving in different lanes is analyzed using the orthotropic plate theory and modal superposition technique. The dynamic loading is studied in terms of the dynamic impact factor of the bridge deck. The impact factor is found varying in an opposite trend as the dynamic responses for the different loading cases under study.

  15. Appendix G : end region design models.

    DOT National Transportation Integrated Search

    2013-03-01

    The 2007 AASHTO LRFD Bridge Design Specifications contain prescriptive : requirements for the quantity and placement of confinement reinforcement located in the bottom : flange of pretensioned concrete I-girders. This chapter proposes a rational mode...

  16. Recalibration of the GRLWEAP LRFD resistance factor for Oregon DOT.

    DOT National Transportation Integrated Search

    2011-02-01

    The Bridge Section of the Oregon Department of Transportation (ODOT) is responsible for the design of all bridge structures and routinely uses GRLWEAP for controlling pile driving stresses and establishing capacity from the bearing graph. The LRFD re...

  17. Rock mass classification system : transition from RMR to GSI.

    DOT National Transportation Integrated Search

    2013-11-01

    The AASHTO LRFD Bridge Design Specifications is expected to replace the rock mass rating : (RMR) system with the Geological Strength Index (GSI) system for classifying and estimating : engineering properties of rock masses. This transition is motivat...

  18. Development of LRFD procedures for bridge pile foundations in Iowa - volume III : recommended resistance factors with consideration of construction control and setup.

    DOT National Transportation Integrated Search

    2012-02-01

    The Federal Highway Administration (FHWA) mandated utilizing the Load and Resistance Factor Design (LRFD) approach for all new bridges initiated in the United States after October 1, 2007. As a result, there has been a progressive move among state De...

  19. Effects of increasing the allowable compressive stress at release on the shear strength of prestressed concrete girders.

    DOT National Transportation Integrated Search

    2008-09-01

    In recent years, several research projects have been conducted to study the feasibility of increasing the allowable : compressive stress in concrete at prestress transfer, currently defined as 0.60f'ci in the AASHTO LRFD Bridge : Design Specification...

  20. Design of mechanically stabilized earth wall connections and end of walls subjected to seismic loads.

    DOT National Transportation Integrated Search

    2014-01-01

    The 4th Edition of the AASHTO LRFD Bridge Design Specifications requires all states to design for a 1,000- : year return period earthquake, as opposed to earlier editions 500-year return period. In response to this : requirement, the Colorado Depa...

  1. Development of LRFD design procedures for bridge piles in Iowa : field testing of steel H-piles in clay, sand, and mixed soils and data analysis (volume II).

    DOT National Transportation Integrated Search

    2011-09-01

    In response to the mandate on Load and Resistance Factor Design (LRFD) implementations by the Federal Highway Administration : (FHWA) on all new bridge projects initiated after October 1, 2007, the Iowa Highway Research Board (IHRB) sponsored these r...

  2. Calibration of load and resistance factors in LRFD foundation design specifications

    DOT National Transportation Integrated Search

    2011-02-01

    This report summarizes the findings and recommendations on the impact of foundation settlements on the reliability of bridge superstructures. As a collaborative effort of an overall initiative for the development of LRFD foundation design specificati...

  3. Probabilistic model of bridge vehicle loads in port area based on in-situ load testing

    NASA Astrophysics Data System (ADS)

    Deng, Ming; Wang, Lei; Zhang, Jianren; Wang, Rei; Yan, Yanhong

    2017-11-01

    Vehicle load is an important factor affecting the safety and usability of bridges. An statistical analysis is carried out in this paper to investigate the vehicle load data of Tianjin Haibin highway in Tianjin port of China, which are collected by the Weigh-in- Motion (WIM) system. Following this, the effect of the vehicle load on test bridge is calculated, and then compared with the calculation result according to HL-93(AASHTO LRFD). Results show that the overall vehicle load follows a distribution with a weighted sum of four normal distributions. The maximum vehicle load during the design reference period follows a type I extremum distribution. The vehicle load effect also follows a weighted sum of four normal distributions, and the standard value of the vehicle load is recommended as 1.8 times that of the calculated value according to HL-93.

  4. High skew link slab bridge system with deck sliding over backwall or backwall sliding over abutments : appendices.

    DOT National Transportation Integrated Search

    2011-09-01

    AASHTO LRFD (2010) requires combined live and thermal load effects for the service : limit state design. The Design Procedure described in the appendix will follow the : rationale developed by Ulku et al. (2009). Link slab design moments are calculat...

  5. Development of LRFD resistance factors for mechanically stabilized earth (MSE) walls : [technical summary].

    DOT National Transportation Integrated Search

    2013-12-01

    Bridge approach embankments and many other : transportation-related applications make use of : reinforced earth retaining structures. Mechanically : Stabilized Earth (MSE) walls are designed under : the Load and Resistance Factor Design (LRFD) : meth...

  6. Project 2d: Calibration of Load and Resistance Factors in LRFD Foundation Design Specifications

    DOT National Transportation Integrated Search

    2011-02-01

    This report summarizes the findings and recommendations on the impact of foundation settlements on the reliability of bridge superstructures. As a : collaborative effort of an overall initiative for the development of LRFD foundation design specifica...

  7. Implementation of LRFD geotechnical design for deep foundations using Texas Cone Penetrometer (TCP) test.

    DOT National Transportation Integrated Search

    2015-09-01

    This study provides resistance factors (I) for design of deep foundations to implement Load and Resistance Factor Design (LRFD) for bridge foundations using Texas Cone Penetrometer (TCP) Test data. Initial efforts were made to determine resistance fa...

  8. Electronic automation of LRFD design programs.

    DOT National Transportation Integrated Search

    2010-03-01

    The study provided electronic programs to WisDOT for designing pre-stressed girders and piers using the Load : Resistance Factor Design (LRFD) methodology. The software provided is intended to ease the transition to : LRFD for WisDOT design engineers...

  9. Railing systems for use on timber deck bridges

    Treesearch

    Ronald K. Faller; Michael A. Ritter; Barry T. Rosson; Sheila R. Duwadi

    1999-01-01

    Bridge railing systems in the United States have historically been designed based on static load criteria given in the AASHTO Standard Specifications for Highway Bridges. In the past decade, full-scale vehicle crash testing has been recognized as a more appropriate and reliable method of evaluating bridge railing acceptability. In 1989. AASHTO published the Guide...

  10. Comparative analysis of design codes for timber bridges in Canada, the United States, and Europe

    Treesearch

    James Wacker; James (Scott) Groenier

    2010-01-01

    The United States recently completed its transition from the allowable stress design code to the load and resistance factor design (LRFD) reliability-based code for the design of most highway bridges. For an international perspective on the LRFD-based bridge codes, a comparative analysis is presented: a study addressed national codes of the United States, Canada, and...

  11. Effect of portland cement (current ASTM C150/AASHTO M85) with limestone and process addition (ASTM C465/AASHTO M327) on the performance of concrete for pavement and bridge decks.

    DOT National Transportation Integrated Search

    2014-02-01

    The Illinois Department of Transportation (IDOT) is making several changes to concrete mix designs, using revisions to : cement specification ASTM C150/AASHTO M85 and ASTM C465/AASHTO M327. These proposed revisions will enable the : use of more susta...

  12. Bridge inspector's manual for movable bridges.

    DOT National Transportation Integrated Search

    1977-01-01

    Importance of Inspection-Movable bridges are built to the rigid specifications : of such groups as the American Association of State Highway and : Transportation Officials (AASHTO), the American Road Builders Association : (ARBA) and Underwriters Lab...

  13. Calibration of the live load factor in LRFD design guidelines.

    DOT National Transportation Integrated Search

    2010-09-01

    The Load and Resistant Factor Design (LRFD) approach is based on the concept of structural reliability. The approach is : more rational than the former design approaches such as Load Factor Design or Allowable Stress Design. The LRFD : Specification ...

  14. Calibration of the live load factor in LRFD design guidelines : [revised].

    DOT National Transportation Integrated Search

    2011-07-01

    The Load and Resistant Factor Design (LRFD) approach is based on the concept of structural reliability. The approach is : more rational than the former design approaches such as Load Factor Design or Allowable Stress Design. The LRFD : Specification ...

  15. Structural characterization of UHPC waffle bridge deck and connections.

    DOT National Transportation Integrated Search

    2014-07-01

    The AASHTO strategic plan in 2005 for bridge engineering identified extending the service life of bridges and accelerating bridge : construction as two of the grand challenges in bridge engineering. These challenges have the objective of producing sa...

  16. Calibration of Resistance Factors Needed in the LRFD Design of Drilled Shafts

    DOT National Transportation Integrated Search

    2010-09-01

    The first report on Load and Resistance Factor Design (LRFD) calibration of driven piles in Louisiana (LTRC Final Report 449) was : completed in May 2009. As a continuing effort to implement the LRFD design methodology for deep foundations in Louisia...

  17. Calibration of resistance factors needed in the LRFD design of drilled shafts.

    DOT National Transportation Integrated Search

    2010-09-01

    The first report on Load and Resistance Factor Design (LRFD) calibration of driven piles in Louisiana (LTRC Final Report 449) was completed in May 2009. As a continuing effort to implement the LRFD design methodology for deep foundations in Louisiana...

  18. Calibration of resistance factors needed in the LRFD design of drilled shafts.

    DOT National Transportation Integrated Search

    2010-09-01

    The first report on Load and Resistance Factor Design (LRFD) calibration of driven piles in Louisiana (LTRC Final Report 449) was : completed in May 2009. As a continuing effort to implement the LRFD design methodology for deep foundations in Louisia...

  19. Bridge removal plan requirements.

    DOT National Transportation Integrated Search

    2011-04-15

    This report provides resources that detail specifications and guidelines related to bridge removal plans across the : United States. We have organized the information into three sections: : ! National Guidance : Includes language from AASHTO specific...

  20. Development of risk models for Florida's bridge management system.

    DOT National Transportation Integrated Search

    2013-06-01

    Florida Department of Transportation (FDOT) has been actively implementing the American Association of State Highway Transportation Officials (AASHTO) Pontis Bridge Management System (BMS), recently renamed AASHTOWare Bridge Management (BrM), to supp...

  1. Serviceability-related issues for bridge live load deflection and construction closure pours : [research summary].

    DOT National Transportation Integrated Search

    2015-06-01

    The Load and Resistance Factor Design (LRFD) method has evolved to become a : more reliable approach to bridge design in the past century. Nevertheless, safety is : always the number one concern in the design of bridge structures. Equally important, ...

  2. The effect of bridge deck design methodology on crack control.

    DOT National Transportation Integrated Search

    2010-01-30

    At present, the Idaho Transportation Department (ITD) Bridge Design Manual allows engineers to use the AASHTO empirical method to : design concrete bridge decks. However, the ITD Bridge Section would like to compare their design practices to those em...

  3. Overload truck wheel load distribution on bridge decks.

    DOT National Transportation Integrated Search

    2009-04-01

    There is a need to accurately analyze the load effects on bridge decks from permitted overload trucks on : Michigans roads. The AASHTO Standard Specifications for Highway Bridges, 17th edition, provides a : distribution width of live loads when re...

  4. Crashworthy railing for timber bridges

    Treesearch

    Michael A. Ritter; Ronald K. Faller; Sheila Rimal Duwadi

    1999-01-01

    Bridge railing systems in the United States have historically beers designed based on static load criteria given in the American Association of State Highway and Transportation 0fficials (AASHTO) Standard Specifications for Highway Bridges. In the past decade, full-scale vehicle crash testing has been recognized as a more appropriate and reliable method of evaluating...

  5. Improved load rating of reinforced concrete slab bridges.

    DOT National Transportation Integrated Search

    2007-09-01

    In New Mexico, many reinforced concrete slab (RCS) bridges provide service on interstates I-10, I-25, and I-40. An accurate strength evaluation of interstate bridges is essential to avoid unnecessary load restrictions. The AASHTO load rating factor f...

  6. Reduction of Bridge Deck Cracking through Alternative Material Usage

    DOT National Transportation Integrated Search

    2017-12-01

    ODOT routinely deploys a large number of continuous span structural slab bridges. Despite being designed to strictly satisfy all the relevant AASHTO and ODOT BDM requirements, many such bridge decks show transverse cracks, with widths greater than th...

  7. Modeling the response of fracture critical steel box-girder bridges.

    DOT National Transportation Integrated Search

    2010-02-01

    Bridges that are classified as fracture critical by AASHTO require more frequent inspections than other types of : bridges, resulting in greater costs for their maintenance. Several historical events have shown, however, that : severe damage can occu...

  8. Structural design parameters of current WSDOT mixtures.

    DOT National Transportation Integrated Search

    2013-06-01

    The AASHTO LRFD, as well as other design manuals, has specifications that estimate the structural performance of a concrete mixture with regard to compressive strength, tensile strength, and deformation-related properties such as the modulus of elast...

  9. Traffic and data preparation for AASHTO MEPDG analysis and designs.

    DOT National Transportation Integrated Search

    2011-10-01

    "The Mechanistic Empirical Pavement Design Guide (MEPDG) and the : subsequent AASHTO product DARWin-ME are signifi cant advancements in : pavement design. However, they are substantially more complex than the : 1993 AASHTO Guide, which is currently u...

  10. Using expert opinion to quantify accuracy and reliability of nondestructive evaluation on bridges.

    DOT National Transportation Integrated Search

    2015-08-01

    Bridge inspection is an important phase in bridge management. In 2009, a joint American Society of Civil : Engineers Structural Engineering Institute and AASHTO Ad-Hoc group was created to identify the issues : in bridge safety and to study current b...

  11. Calibration of region-specific gates equation for LRFD.

    DOT National Transportation Integrated Search

    2014-02-01

    The objectives of this research are to recalibrate the FHWA-modi ed Gates equation : and update the associated LRFD resistance factor for pile types and local soil conditions : encountered in Louisiana. This research is consistent with FHWA recomm...

  12. Optimizing Mississippi aggregates for concrete bridge decks.

    DOT National Transportation Integrated Search

    2012-12-01

    AASHTO M 43 Standard Specification for Sizes of Aggregate for Road and Bridge Construction : addresses particle size distribution of material included in various maximum nominal size aggregates. This : particle size distribution requires additi...

  13. A Brillouin smart FRP material and a strain data post processing software for structural health monitoring through laboratory testing and field application on a highway bridge

    NASA Astrophysics Data System (ADS)

    Bastianini, Filippo; Matta, Fabio; Galati, Nestore; Nanni, Antonio

    2005-05-01

    Strain and temperature sensing obtained through frequency shift evaluation of Brillouin scattered light is a technology that seems extremely promising for Structural Health Monitoring (SHM). Due to the intrinsic distributed sensing capability, Brillouin can measure the deformation of any individual segment of huge lengths of inexpensive single-mode fiber. In addition, Brillouin retains other typical advantages of Fiber Optic Sensors (FOS), such as harsh environment durability and interference rejection. Despite these advantages, the diffusion of Brillouin for SHM is constrained by different factors, such as the high equipment cost, the commercial unavailability of specific SHM oriented fiber products and even some prejudices on the required sensitivity performances. In the present work, a complete SHM pilot application was developed, installed and successfully operated during a diagnostic load test on the High Performance Steel (HPS) bridge A6358 located at the Lake of the Ozarks (Miller County, MO, USA). Four out of five girders were extensively instrumented with a "smart" Glass Fiber Reinforced Polymer (GFRP) tape having embedded fibers for strain sensing and thermal compensation. Data collected during a diagnostic load test were elaborated through a specific post-processing software, and the strain profiles retrieved were compared to traditional strain gauges and theoretical results based on the AASHTO LRFD Bridge Design Specifications for structural assessment purposes. The excellent results obtained confirm the effectiveness of Brillouin SHM systems for the monitoring of real applications.

  14. AASHTO transportation asset management guide : a focus on implementation executive summary.

    DOT National Transportation Integrated Search

    2013-06-01

    This AASHTO Transportation Asset Management Executive Summary serves as a companion to the AASHTO Transportation : Asset Management GuideA Focus on Implementation, which takes as a starting point the Transportation : Asset Management Guide publish...

  15. Advanced bridge safety initiative : recommended practices for live load testing of existing flat-slab concrete bridges - task 5.

    DOT National Transportation Integrated Search

    2012-12-01

    Current AASHTO provisions for load rating flat-slab concrete bridges use the equivalent strip : width method, which is regarded as overly conservative compared to more advanced analysis : methods and field live load testing. It has been shown that li...

  16. Determination of barge impact probabilities for bridge design.

    DOT National Transportation Integrated Search

    2016-04-01

    Waterway bridges in the United States are designed to resist vessel collision loads according to design provisions released by the American Association of State : Highway and Transportation Officials (AASHTO). These provisions provide detailed proced...

  17. Multi-barge flotilla impact forces on bridges.

    DOT National Transportation Integrated Search

    2008-06-01

    The current AASHTO equations for barge impact loads are based on scale models of barges, and may not accurately predict impact loads on bridge piers. The results of this study produce more realistic flotilla impact design loads, potentially leading t...

  18. AASHTO connected vehicle infrastructure deployment analysis.

    DOT National Transportation Integrated Search

    2011-06-17

    This report describes a deployment scenario for Connected Vehicle infrastructure by state and local transportation agencies, together with a series of strategies and actions to be performed by AASHTO to support application development and deployment.

  19. Refinement of Strut-and-Tie Model for Reinforced Concrete Deep Beams

    PubMed Central

    Panjehpour, Mohammad; Chai, Hwa Kian; Voo, Yen Lei

    2015-01-01

    Deep beams are commonly used in tall buildings, offshore structures, and foundations. According to many codes and standards, strut-and-tie model (STM) is recommended as a rational approach for deep beam analyses. This research focuses on the STM recommended by ACI 318-11 and AASHTO LRFD and uses experimental results to modify the strut effectiveness factor in STM for reinforced concrete (RC) deep beams. This study aims to refine STM through the strut effectiveness factor and increase result accuracy. Six RC deep beams with different shear span to effective-depth ratios (a/d) of 0.75, 1.00, 1.25, 1.50, 1.75, and 2.00 were experimentally tested under a four-point bending set-up. The ultimate shear strength of deep beams obtained from non-linear finite element modeling and STM recommended by ACI 318-11 as well as AASHTO LRFD (2012) were compared with the experimental results. An empirical equation was proposed to modify the principal tensile strain value in the bottle-shaped strut of deep beams. The equation of the strut effectiveness factor from AASHTTO LRFD was then modified through the aforementioned empirical equation. An investigation on the failure mode and crack propagation in RC deep beams subjected to load was also conducted. PMID:26110268

  20. Improved Simplified Methods for Effective Seismic Analysis and Design of Isolated and Damped Bridges in Western and Eastern North America

    NASA Astrophysics Data System (ADS)

    Koval, Viacheslav

    The seismic design provisions of the CSA-S6 Canadian Highway Bridge Design Code and the AASHTO LRFD Seismic Bridge Design Specifications have been developed primarily based on historical earthquake events that have occurred along the west coast of North America. For the design of seismic isolation systems, these codes include simplified analysis and design methods. The appropriateness and range of application of these methods are investigated through extensive parametric nonlinear time history analyses in this thesis. It was found that there is a need to adjust existing design guidelines to better capture the expected nonlinear response of isolated bridges. For isolated bridges located in eastern North America, new damping coefficients are proposed. The applicability limits of the code-based simplified methods have been redefined to ensure that the modified method will lead to conservative results and that a wider range of seismically isolated bridges can be covered by this method. The possibility of further improving current simplified code methods was also examined. By transforming the quantity of allocated energy into a displacement contribution, an idealized analytical solution is proposed as a new simplified design method. This method realistically reflects the effects of ground-motion and system design parameters, including the effects of a drifted oscillation center. The proposed method is therefore more appropriate than current existing simplified methods and can be applicable to isolation systems exhibiting a wider range of properties. A multi-level-hazard performance matrix has been adopted by different seismic provisions worldwide and will be incorporated into the new edition of the Canadian CSA-S6-14 Bridge Design code. However, the combined effect and optimal use of isolation and supplemental damping devices in bridges have not been fully exploited yet to achieve enhanced performance under different levels of seismic hazard. A novel Dual-Level Seismic

  1. Condition factor calibration for load and resistance factor rating of steel girder bridges : final report.

    DOT National Transportation Integrated Search

    2016-06-01

    Load and Resistance Factor Rating (LRFR) is a reliability-based rating procedure complementary to Load and Resistance Factor Design (LRFD). The intent of LRFR is to provide consistent reliability for all bridges regardless of in-situ condition. The p...

  2. Advanced bridge safety initiative, task 1 : development of improved analytical load rating procedures for flat-slab concrete bridges - a thesis and guidelines.

    DOT National Transportation Integrated Search

    2010-01-01

    Current AASHTO provisions for the conventional load rating of flat slab bridges rely on the equivalent strip method : of analysis for determining live load effects, this is generally regarded as overly conservative by many professional : engineers. A...

  3. Reliability-based criteria for load and resistance factor design code for wood bridges

    Treesearch

    Chris Eamon; Andrzej S. Nowak; Michael A. Ritter; Joe Murphy

    2000-01-01

    Recently AASHTO adopted a load and resistance factor design code for highway bridges. The new code provides a rational basis for the design of steel and concrete structures. However, the calibration was not done for wood bridges. Therefore, there is a need to fill this gap. The development of statistical models for wood bridge structures is discussed. Recent test...

  4. Re-Evaluation of the AASHTO-Flexible Pavement Design Equation with Neural Network Modeling

    PubMed Central

    Tiğdemir, Mesut

    2014-01-01

    Here we establish that equivalent single-axle loads values can be estimated using artificial neural networks without the complex design equality of American Association of State Highway and Transportation Officials (AASHTO). More importantly, we find that the neural network model gives the coefficients to be able to obtain the actual load values using the AASHTO design values. Thus, those design traffic values that might result in deterioration can be better calculated using the neural networks model than with the AASHTO design equation. The artificial neural network method is used for this purpose. The existing AASHTO flexible pavement design equation does not currently predict the pavement performance of the strategic highway research program (Long Term Pavement Performance studies) test sections very accurately, and typically over-estimates the number of equivalent single axle loads needed to cause a measured loss of the present serviceability index. Here we aimed to demonstrate that the proposed neural network model can more accurately represent the loads values data, compared against the performance of the AASHTO formula. It is concluded that the neural network may be an appropriate tool for the development of databased-nonparametric models of pavement performance. PMID:25397962

  5. Re-evaluation of the AASHTO-flexible pavement design equation with neural network modeling.

    PubMed

    Tiğdemir, Mesut

    2014-01-01

    Here we establish that equivalent single-axle loads values can be estimated using artificial neural networks without the complex design equality of American Association of State Highway and Transportation Officials (AASHTO). More importantly, we find that the neural network model gives the coefficients to be able to obtain the actual load values using the AASHTO design values. Thus, those design traffic values that might result in deterioration can be better calculated using the neural networks model than with the AASHTO design equation. The artificial neural network method is used for this purpose. The existing AASHTO flexible pavement design equation does not currently predict the pavement performance of the strategic highway research program (Long Term Pavement Performance studies) test sections very accurately, and typically over-estimates the number of equivalent single axle loads needed to cause a measured loss of the present serviceability index. Here we aimed to demonstrate that the proposed neural network model can more accurately represent the loads values data, compared against the performance of the AASHTO formula. It is concluded that the neural network may be an appropriate tool for the development of databased-nonparametric models of pavement performance.

  6. An Experimental Study of Elastomeric Bridge Bearings with Design Recommendations

    DOT National Transportation Integrated Search

    1995-10-01

    Recent AASHTO specifications have placed a number of restrictions on the use of elastomeric bridge bearings. Elastomeric bearings with tapers built in to accommodate span end elevation differences were disallowed by the most current specifications ev...

  7. A static analysis method for barge-impact design of bridges with consideration of dynamic amplification : final report, November 2009.

    DOT National Transportation Integrated Search

    2009-11-01

    Current practice with regard to designing bridge structures to resist impact loads associated with barge collisions relies upon the : use of the American Association of State Highway and Transportation Officials (AASHTO) bridge design specifications....

  8. Development of LRFD resistance factors for mechanically stabilized earth (MSE) walls.

    DOT National Transportation Integrated Search

    2013-12-01

    Over 100 centrifuge tests were conducted to assess Load and Resistance Factor : Design (LRFD) resistance factors for external stability of Mechanically Stabilized Earth (MSE) walls : founded on granular soils. In the case of sliding stability, the te...

  9. Development of a real-time bridge structural monitoring and warning system: a case study in Thailand

    NASA Astrophysics Data System (ADS)

    Khemapech, I.; Sansrimahachai, W.; Toachoodee, M.

    2017-04-01

    Regarded as one of the physical aspects under societal and civil development and evolution, engineering structure is required to support growth of the nation. It also impacts life quality and safety of the civilian. Despite of its own weight (dead load) and live load, structural members are also significantly affected by disaster and environment. Proper inspection and detection are thus crucial both during regular and unsafe events. An Enhanced Structural Health Monitoring System Using Stream Processing and Artificial Neural Network Techniques (SPANNeT) has been developed and is described in this paper. SPANNeT applies wireless sensor network, real-time data stream processing and artificial neural network based upon the measured bending strains. Major contributions include an effective, accurate and energy-aware data communication and damage detection of the engineering structure. Strain thresholds have been defined according to computer simulation results and the AASHTO (American Association of State Highway and Transportation Officials) LRFD (Load and Resistance Factor Design) Bridge Design specifications for launching several warning levels. SPANNeT has been tested and evaluated by means of computer-based simulation and on-site levels. According to the measurements, the observed maximum values are 25 to 30 microstrains during normal operation. The given protocol provided at least 90% of data communication reliability. SPANNeT is capable of real-time data report, monitoring and warning efficiently conforming to the predefined thresholds which can be adjusted regarding user's requirements and structural engineering characteristics.

  10. Validation and implementation of bridge design specifications for barge impact loading.

    DOT National Transportation Integrated Search

    2014-07-01

    Since 1991 in the United States, the design of highway bridges to resist collisions by errant waterway vessels has been carried out : in accordance with design provisions published by AASHTO. These provisions have remained largely unchanged for more ...

  11. Calibration of resistance factors needed in the LRFD design of driven piles.

    DOT National Transportation Integrated Search

    2009-05-01

    This research project presents the calibration of resistance factors for the Load and Resistance Factor Design (LRFD) method of driven : piles driven into Louisiana soils based on reliability theory. Fifty-three square Precast-Prestressed-Concrete (P...

  12. Calibration of Resistance Factors Needed in the LRFD Design of Driven Piles

    DOT National Transportation Integrated Search

    2009-05-01

    This research project presents the calibration of resistance factors for the Load and Resistance Factor Design (LRFD) method of driven : piles driven into Louisiana soils based on reliability theory. Fifty-three square Precast-Prestressed-Concrete (P...

  13. Improved guidance for users of the 1993 AASHTO flexible pavement design procedures : LTPP TechBrief

    DOT National Transportation Integrated Search

    1997-08-01

    A key design challenge faced by engineers using the 1993 AASHTO Guide for Design of Pavement Structures (AASHTO Guide) is the determination of appropriate design parameters for the subgrade and pavement materials. The Long-Term Pavement Performance (...

  14. AASHTO mechanistic-empirical pavement design guide parametric study.

    DOT National Transportation Integrated Search

    2012-03-01

    This study focuses on assessing the robustness of the AASHTO Mechanistic-Empirical Pavement Design Guide (MEPDG v 1.1) for rigid pavement : design projects in Wisconsin. The primary tasks conducted in this study included performing sensitivity analys...

  15. Enhancement of the FDOT's project level and network level bridge management analysis tools

    DOT National Transportation Integrated Search

    2011-02-01

    Over several years, the Florida Department of Transportation (FDOT) has been implementing the AASHTO Pontis Bridge Management System to support network-level and project-level decision making in the headquarters and district offices. Pontis is an int...

  16. Finite element simulation of truck impacts on highway bridge piers : final report.

    DOT National Transportation Integrated Search

    2016-04-01

    Recent studies show that the dynamic forces because of truck impacts may be significantly higher than the : 600kips force recommended by the AASHTO. Hence, there is a need to carry out detailed investigations : on vehicular-bridge collision for a rel...

  17. Comparison of AASHTO moisture sensitivity test (T-283) with Connecticut Department of Transportation modified test method

    DOT National Transportation Integrated Search

    1999-08-01

    Several different interpretations of the American Association of State Highway and Transportation Officials' (AASHTO's) Moisture Sensitivity Test exist. The official AASHTO interpretation of this test method does not account for water which has been ...

  18. Heat-curved girders : deflections and camber loss during and subsequent to bridge construction.

    DOT National Transportation Integrated Search

    1982-01-01

    The present AASHTO bridge design specifications require that additional camber be built into steel girders that are to be heat curved. The additional camber is provided to allow for subsequent losses due to the dissipation of residual stresses impose...

  19. Live load rating of short span highway bridges as controlled by the exterior girder.

    DOT National Transportation Integrated Search

    1977-01-01

    The 1973 AASHTO Standard Specifications for Highway Bridge introduced the requirement that "In no case shall an exterior stringer have less carrying capacity than an interior stringer." This statement resulted from the concern that many original exte...

  20. Simultaneous Detection and Classification of Acoustic Emissions in Integrated Diagnostics with Yield in Aluminum

    NASA Astrophysics Data System (ADS)

    Parmar, Devendra

    2006-04-01

    Acoustic emission (AE) experiments were conducted on a strained aluminum (10 cm x 9 cm x 0.25 cm) specimen. Studies were conducted with the goal to characterize AE associated with material yield developed due to high loading and to correlate the course of the yield with AE signals. The American Association of State Highway and Transport Officials (AASHTO) listed aluminum as one of the structural components of highway brides^1 with unit weight of 2800 kg.m-3. The specimen, mounted on the load frame, was held on each end by the wedge grips and was electromechanically tested in a tension mode at rates of extension of 0.0333 mm/s and 0.0666 mm/s. Load was applied to the test frame via moving cross heads. A load transducer (load cell) mounted in series with the specimen measured the applied load by converting it into an electrical signal. Results are analyzed using defect zone model in which location of the defect is determined from the measurement of the arrival time of the signal at two different sensors placed at strategically around the source of emission from the test object. The sensor that detects the signal first is identified to be in the defect zone. ^1AASHTO LRFD Bridge Design Specifications, 1994.

  1. Strategic sensor locations of FPR bridge decks

    NASA Astrophysics Data System (ADS)

    Wu, Hwai-Chung; Warnemuende, Kraig; Yan, An; Mu, Bin

    2003-07-01

    Advanced fiber-reinforced polymer composite (FRP) has been increasingly used in bridge deck to replace concrete or steel. A FRP bridge deck can be designed to meet AASHTO HS-25 load requirements. FRP decks have many advantages over the conventional reinforced concrete or steel decks owing to their lightweight, high strength and corrosion resistance. However, such new deck system requires extensive monitoring to ensure its designed performance before its widespread acceptance by the bridge community. For inspection and evaluation purpose, a proper monitoring system consisting of various kinds of sensors installed in the FRP deck is critical. This paper provides a framework for designing an efficient monitoring system. The strategic sensor locations are identified based on the stress analysis of the FRP deck.

  2. LRFD Resistance Factor Calibration for Axially Loaded Drilled Shafts in the Las Vegas Valley

    DOT National Transportation Integrated Search

    2016-07-19

    Resistance factors for LRFD of axially loaded drilled shafts in the Las Vegas Valley are calibrated using data from 41 field load tests. In addition to the traditional implementation of Monte Carlo (MC) simulations for calibration, a more robust tech...

  3. Implementation of the AASHTO mechanistic-empirical pavement design guide for Colorado.

    DOT National Transportation Integrated Search

    2000-01-01

    The objective of this project was to integrate the American Association of State Highway and Transportation Officials (AASHTO) Mechanistic-Empirical Pavement Design Guide, Interim Edition: A Manual of Practice and its accompanying software into the d...

  4. Wireless Smart Sensor Network System Using SmartBridge Sensor Nodes for Structural Health Monitoring of Existing Concrete Bridges

    NASA Astrophysics Data System (ADS)

    Gaviña, J. R.; Uy, F. A.; Carreon, J. D.

    2017-06-01

    There are over 8000 bridges in the Philippines today according to the Department of Public Works and Highways (DPWH). Currently, visual inspection is the most common practice in monitoring the structural integrity of bridges. However, visual inspections have proven to be insufficient in determining the actual health or condition of a bridge. Structural Health Monitoring (SHM) aims to give, in real-time, a diagnosis of the actual condition of the bridge. In this study, SmartBridge Sensor Nodes were installed on an existing concrete bridge with American Association of State Highway and Transportation Officials (AASHTO) Type IV Girders to gather vibration of the elements of the bridge. Also, standards on the effective installation of SmartBridge Sensor Nodes, such as location and orientation was determined. Acceleration readings from the sensor were then uploaded to a server, wherein they are monitored against certain thresholds, from which, the health of the bridge will be derived. Final output will be a portal or webpage wherein the information, health, and acceleration readings of the bridge will be available for viewing. With levels of access set for different types of users, the main users will have access to download data and reports. Data transmission and webpage access are available online, making the SHM system wireless.

  5. Analytical investigation of bidirectional ductile diaphragms in multi-span bridges

    NASA Astrophysics Data System (ADS)

    Wei, Xiaone; Bruneau, Michel

    2018-04-01

    In the AASHTO Guide Specifications for Seismic Bridge Design Provisions, ductile diaphragms are identified as Permissible Earthquake-Resisting Elements (EREs), designed to help resist seismic loads applied in the transverse direction of bridges. When adding longitudinal ductile diaphragms, a bidirectional ductile diaphragm system is created that can address seismic excitations acting along both the bridge's longitudinal and transverse axes. This paper investigates bidirectional ductile diaphragms with Buckling Restrained Braces (BRBs) in straight multi-span bridge with simply supported floating spans. The flexibility of the substructures in the transverse and longitudinal direction of the bridge is considered. Design procedures for the bidirectional ductile diaphragms are first proposed. An analytical model of the example bridge with bidirectional ductile diaphragms, designed based on the proposed methodology, is then built in SAP2000. Pushover and nonlinear time history analyses are performed on the bridge model, and corresponding results are presented. The effect of changing the longitudinal stiffness of the bidirectional ductile diaphragms in the end spans connecting to the abutment is also investigated, in order to better understand the impact on the bridge's dynamic performance.

  6. Modification of LRFD resistance factors based on site variability : final report, November 2009.

    DOT National Transportation Integrated Search

    2009-11-01

    Current practice by the Florida Department of Transportation (FDOT), Federal Highway Administration (FHWA), and American Association of State Highway Transportation Officials (AASHTO) for deep foundation design is to use a constant load and resistanc...

  7. Implementation of the new AASHTO pavement design procedure in Louisiana : final report.

    DOT National Transportation Integrated Search

    1990-06-01

    This study was undertaken to provide the LA DOTD with an implementation package to facilitate adoption of the new AASHTO Guide for Design of Pavement Structures. The study included evaluation of design parameters for rigid and flexible pavements, inc...

  8. Implementation of the 2002 AASHTO design guide for pavement structures in KDOT

    DOT National Transportation Integrated Search

    2008-11-01

    The AASHTO Guide for the Design of Pavement Structures is the primary document used by state highway agencies to design new and rehabilitated highway pavements. Currently the Kansas Department of Transportation (KDOT) uses the 1993 edition of the AAS...

  9. Development of variable LRFD \\0x03C6 factors for deep foundation design due to site variability.

    DOT National Transportation Integrated Search

    2012-04-01

    The current design guidelines of Load and Resistance Factor Design (LRFD) specifies constant values : for deep foundation design, based on analytical method selected and degree of redundancy of the pier. : However, investigation of multiple sites in ...

  10. Design of overlays for flexible pavements based on AASHTO road test data.

    DOT National Transportation Integrated Search

    1978-01-01

    The need for a suitable method of designing the thickness of overlays and predicting the performance of the overlaid pavement has recently been recognized. The AASHTO Road Tests included studies on 99 overlays, but they failed to produce conclusive r...

  11. Development of variable LRFD \\0x03C6 factors for deep foundation design due to site variability [summary].

    DOT National Transportation Integrated Search

    2012-01-01

    Both the Florida Department of Transportation : (FDOT) and the Federal Highway Administration : (FHWA) specify use of fixed resistance factors () : for Load and Resistance Factored Design (LRFD) of : deep foundations, depending on design approach :...

  12. Miscellaneous wood structures

    Treesearch

    Michael A. Ritter; Keith F. Faherty

    1999-01-01

    This section addresses the design of two types of glulam timber bridges : beam bridges with transverse decks and longitudinal glulam deck (slab) bridges. The material presented in the section is based on the 1992 edition of the AASHTO Standard Specifications for Highway Bridges (AASHTO specifications), including interim specifications through 1993. When specific design...

  13. Reliability-based evaluation of bridge components for consistent safety margins.

    DOT National Transportation Integrated Search

    2010-10-01

    The Load and Resistant Factor Design (LRFD) approach is based on the concept of structural reliability. The approach is more : rational than the former design approaches such as Load Factor Design or Allowable Stress Design. The LRFD Specification fo...

  14. Engineering properties of stabilized subgrade soils for implementation of the AASHTO 2002 pavement design guide.

    DOT National Transportation Integrated Search

    2009-06-01

    A comprehensive laboratory study was undertaken to determine engineering properties of cementitiously stabilized common subgrade soils in Oklahoma for the design of roadway pavements in accordance with the AASHTO 2002 Mechanistic-Empirical Pavement D...

  15. Development of a simplified flexible pavement design protocol for New York State Department of Transportation based on the AASHTO mechanistic-empirical pavement design guide : final report.

    DOT National Transportation Integrated Search

    2017-01-01

    The New York State Department of Transportation (NYSDOT) has used the AASHTO 1993 Design Guide for the design of new flexible pavement structures for more than two decades. The AASHTO 1993 Guide is based on the empirical design equations developed fr...

  16. Evaluation of seismic design spectrum based on UHS implementing fourth-generation seismic hazard maps of Canada

    NASA Astrophysics Data System (ADS)

    Ahmed, Ali; Hasan, Rafiq; Pekau, Oscar A.

    2016-12-01

    Two recent developments have come into the forefront with reference to updating the seismic design provisions for codes: (1) publication of new seismic hazard maps for Canada by the Geological Survey of Canada, and (2) emergence of the concept of new spectral format outdating the conventional standardized spectral format. The fourth -generation seismic hazard maps are based on enriched seismic data, enhanced knowledge of regional seismicity and improved seismic hazard modeling techniques. Therefore, the new maps are more accurate and need to incorporate into the Canadian Highway Bridge Design Code (CHBDC) for its next edition similar to its building counterpart National Building Code of Canada (NBCC). In fact, the code writers expressed similar intentions with comments in the commentary of CHBCD 2006. During the process of updating codes, NBCC, and AASHTO Guide Specifications for LRFD Seismic Bridge Design, American Association of State Highway and Transportation Officials, Washington (2009) lowered the probability level from 10 to 2% and 10 to 5%, respectively. This study has brought five sets of hazard maps corresponding to 2%, 5% and 10% probability of exceedance in 50 years developed by the GSC under investigation. To have a sound statistical inference, 389 Canadian cities are selected. This study shows the implications of the changes of new hazard maps on the design process (i.e., extent of magnification or reduction of the design forces).

  17. Laboratory study of concrete properties to support implementation of the new AASHTO mechanistic-empirical pavement design guide.

    DOT National Transportation Integrated Search

    2012-09-01

    Properties of concrete embodying materials typically used in Wisconsin paving projects were evaluated in support of future : implementation of the AASHTO Mechanistic-Empirical Pavement Design Guide (MEPDG). The primary concrete : properties studied w...

  18. Laboratory study of concrete properties to support implementation of the new AASHTO mechanistic empirical pavement design guide.

    DOT National Transportation Integrated Search

    2012-09-01

    Properties of concrete embodying materials typically used in Wisconsin paving projects were evaluated in support of future : implementation of the AASHTO Mechanistic-Empirical Pavement Design Guide (MEPDG). The primary concrete : properties studied w...

  19. Use of the 1993 AASHTO Guide, MEPDG and historical performance to update the WSDOT Pavement Design Catalog.

    DOT National Transportation Integrated Search

    2011-09-01

    "This report describes the preparation of a revised pavement thickness design catalog for the Washington State Department of Transportation (WSDOT) using the 1993 American Association of State Highway and Transportation Officials (AASHTO) Guide, the ...

  20. Rating precast prestressed concrete bridges for shear

    DOT National Transportation Integrated Search

    2008-12-01

    Shear capacity of real-world prestressed concrete girders designed in the 1960s and 1970s is a concern because : AASHTO Standard Specifications (AASHTO-STD) employed the quarter-point rule for shear design, which is less : conservative for shea...

  1. Modeling Heat and Moisture Transport in Steam-Cured Mortar: Application to Aashto Type Vi Beams.

    PubMed

    Hernández-Bautista, E; Sandoval-Torres, S; de J Cano-Barrita, P F; Bentz, D P

    2017-10-01

    During steam curing of concrete, temperature and moisture gradients are developed, which are difficult to measure experimentally and can adversely affect the durability of concrete. In this research, a model of cement hydration coupled to moisture and heat transport was used to simulate the process of steam curing of mortars with water-to-cement ( w/c ) ratios by mass of 0.30 and 0.45, considering natural convection boundary conditions in mortar and concrete specimens of AASHTO Type VI beams. The primary variables of the model were moisture content, temperature, and degree of hydration. Moisture content profiles of mortar specimens (40 mm in diameter and 50 mm in height) were measured by magnetic resonance imaging. The degree of hydration was obtained by mass-based measurements of loss on ignition to 1000 °C. The results indicate that the model correctly simulates the moisture distribution and degree of hydration in mortar specimens. Application of the model to the steam curing of an AASHTO Type VI beam indicates temperature differences (between the surface and the center) higher than 20 °C during the cooling stage, and internal temperatures higher than 70 °C that may compromise the durability of the concrete.

  2. An investigation of the seismic behavior of a deck-type reinforced concrete arch bridge

    NASA Astrophysics Data System (ADS)

    Farahani, Emadoddin Majdabadi; Maalek, Shahrokh

    2017-07-01

    This paper attempts to explore potential benefits of form in a deck-type reinforced concrete (RC) arch bridge in connection with its overall seismic behavior and performance. Through a detailed three-dimensional finite element modeling and analysis of an actual existing deck-type RC arch bridge, some useful quantitative information have been derived that may serve for a better understanding of the seismic behavior of such arch bridges. A series of the nonlinear dynamic analyses has been carried out under the action of seven different time histories of ground motion scaled to the AASHTO 2012 response spectrum. The concept of demand to capacity ratios has been employed to provide an initial estimation of the seismic performance of the bridge members. As a consequence of the structural form, a particular type of irregularity is introduced due to variable heights of columns transferring the deck loads to the main arch. Hence, a particular attention has been paid to the internal force/moment distributions within the short, medium, and long columns as well as along the main arch. A study of the effects of the vertical component of ground motion has demonstrated the need for the inclusion of these effects in the analysis of such bridges.

  3. 75 FR 27428 - Safety Standards for Steel Erection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-17

    ... in National Highway System construction projects to comply with a number of standards, policies, and...://www.fhwa.dot.gov/bridge/lrfd/index.htm .) For projects involving bridge construction (e.g., temporary... of these requirements will enhance the safety of employees operating on or near structural steel...

  4. Design and performance verification of UHPC piles for deep foundations.

    DOT National Transportation Integrated Search

    2008-11-01

    The strategic plan for bridge engineering issued by AASHTO in 2005 identified extending the service life and optimizing structural : systems of bridges in the United States as two grand challenges in bridge engineering, with the objective of producin...

  5. Feasibility of tubular fender units for pier protection against vessel collision.

    DOT National Transportation Integrated Search

    2008-08-01

    Vessel collisions with bridges are increasing at an alarming rate, as heavy vessels are making more frequent trips under more bridges. In the US, rigorous design of bridges for vessel collision was first incorporated by AASHTO Guide Specification and...

  6. Creep and shrinkage effects on integral abutment bridges

    NASA Astrophysics Data System (ADS)

    Munuswamy, Sivakumar

    Integral abutment bridges provide bridge engineers an economical design alternative to traditional bridges with expansion joints owing to the benefits, arising from elimination of expensive joints installation and reduced maintenance cost. The superstructure for integral abutment bridges is cast integrally with abutments. Time-dependent effects of creep, shrinkage of concrete, relaxation of prestressing steel, temperature gradient, restraints provided by abutment foundation and backfill and statical indeterminacy of the structure introduce time-dependent variations in the redundant forces. An analytical model and numerical procedure to predict instantaneous linear behavior and non-linear time dependent long-term behavior of continuous composite superstructure are developed in which the redundant forces in the integral abutment bridges are derived considering the time-dependent effects. The redistributions of moments due to time-dependent effects have been considered in the analysis. The analysis includes nonlinearity due to cracking of the concrete, as well as the time-dependent deformations. American Concrete Institute (ACI) and American Association of State Highway and Transportation Officials (AASHTO) models for creep and shrinkage are considered in modeling the time dependent material behavior. The variations in the material property of the cross-section corresponding to the constituent materials are incorporated and age-adjusted effective modulus method with relaxation procedure is followed to include the creep behavior of concrete. The partial restraint provided by the abutment-pile-soil system is modeled using discrete spring stiffness as translational and rotational degrees of freedom. Numerical simulation of the behavior is carried out on continuous composite integral abutment bridges and the deformations and stresses due to time-dependent effects due to typical sustained loads are computed. The results from the analytical model are compared with the

  7. Comparison of various methods to determine bulk specific gravity of cores : an investigation of high values using AASHTO T275 - paraffin-coated method.

    DOT National Transportation Integrated Search

    2012-07-01

    A report from a MoDOT asphalt paving project was that unexpected results were obtained when adhering to the standard for determination of bulk specific gravity of compacted asphalt mixture (Gmb) specimens, AASHTO T 166. The test method requires speci...

  8. A Methodology for Multihazards Load Combinations of Earthquake and Heavy Trucks for Bridges

    PubMed Central

    Wang, Xu; Sun, Baitao

    2014-01-01

    Issues of load combinations of earthquakes and heavy trucks are important contents in multihazards bridge design. Current load resistance factor design (LRFD) specifications usually treat extreme hazards alone and have no probabilistic basis in extreme load combinations. Earthquake load and heavy truck load are considered as random processes with respective characteristics, and the maximum combined load is not the simple superimposition of their maximum loads. Traditional Ferry Borges-Castaneda model that considers load lasting duration and occurrence probability well describes random process converting to random variables and load combinations, but this model has strict constraint in time interval selection to obtain precise results. Turkstra's rule considers one load reaching its maximum value in bridge's service life combined with another load with its instantaneous value (or mean value), which looks more rational, but the results are generally unconservative. Therefore, a modified model is presented here considering both advantages of Ferry Borges-Castaneda's model and Turkstra's rule. The modified model is based on conditional probability, which can convert random process to random variables relatively easily and consider the nonmaximum factor in load combinations. Earthquake load and heavy truck load combinations are employed to illustrate the model. Finally, the results of a numerical simulation are used to verify the feasibility and rationality of the model. PMID:24883347

  9. Development of preliminary load and resistance factor design of drilled shafts in Iowa.

    DOT National Transportation Integrated Search

    2014-10-01

    The Federal Highway Administration (FHWA) mandated utilizing the Load and Resistance Factor Design (LRFD) approach for all new : bridges initiated in the United States after October 1, 2007. To achieve part of this goal, a database for Drilled SHAft ...

  10. Bottom flange reinforcement in NU I-girders.

    DOT National Transportation Integrated Search

    2010-08-01

    "The 1996 edition of AASHTO Standard Specifications for Highway Bridges stated that nominal confinement reinforcement be placed to enclose prestressing steel in the bottom flange of bridge girders from girder ends to at least a distance eq changed th...

  11. Survey of welding processes.

    DOT National Transportation Integrated Search

    2003-07-01

    The current KYTC SPECIAL PROVISION NO. 4 WELDING STEEL BRIDGES prohibits the use of welding processes other than shielded metal arc welding (SMAW) and submerged arc welding (SAW). Nationally, bridge welding is codified under ANSI/AASHTO/AWS D1....

  12. 23 CFR 500.107 - BMS.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION TRANSPORTATION INFRASTRUCTURE MANAGEMENT MANAGEMENT AND MONITORING SYSTEMS Management Systems § 500.107 BMS. An effective BMS for bridges on and off Federal-aid highways that should be based on the “AASHTO Guidelines for Bridge Management Systems” 2 and that supplies...

  13. Calibration of Resistance Factors for Drilled Shafts for the New FHWA Design Method : Research Project Capsule

    DOT National Transportation Integrated Search

    2011-02-01

    The Federal Highway Administration (FHWA) and American Association of State : Highway and Transportation Offi cials (AASHTO) require that all federally funded : bridges including substructures be designed using the load and resistance : factor design...

  14. Value engineering and cost effectiveness of various fiber reinforced polymer (FRP) repair systems.

    DOT National Transportation Integrated Search

    2006-06-01

    Seventeen 40 year old C-Channel type prestressed concrete bridge girders and one impact damaged AASHTO : Type II prestressed concrete girder were tested under static and fatigue loading to determine the cost-effectiveness : and value engineering aspe...

  15. Considerations for administering underwater contracts.

    DOT National Transportation Integrated Search

    1984-01-01

    State highway and transportation agencies are required to inspect all bridges on the public road system using guidelines established by AASHTO. Procedures for inspecting the superstructures are well known and the expertise to perform them is availabl...

  16. Behavior and design of large structural concrete bridge pier overhangs.

    DOT National Transportation Integrated Search

    1997-02-01

    In designing large cantilever bent caps for use on recent projects under current AASHTO design specifications, : designers were faced with considerable uncertainties. Questions arose when designers attempted to satisfy : both serviceability and stren...

  17. Use of precast concrete deck panels : summary of research panel types I, II, and III.

    DOT National Transportation Integrated Search

    1999-08-01

    The objective of this research was to investigate the feasibility of using precast concrete deck panels in place of traditional formwork for AASHTO girder type bridges. The precast deck panels span between girders, support the weight of a topping sla...

  18. Improving FHWA's Ability to Assess Highway Infrastructure Health : National Meeting Report

    DOT National Transportation Integrated Search

    2011-12-08

    The FHWA in coordination with AASHTO conducted a study to define a consistent and reliable method to document infrastructure health with a focus on pavements and bridges on the Interstate System, and to develop a framework for tools that can provide ...

  19. Correlation between Wavelength Dispersive X-ray Fluorescence (WDXRF) analysis of hardened concrete for chlorides vs. Atomic Absorption (AA) analysis in accordance with AASHTO T- 260; sampling and testing for chloride ion in concrete and concrete raw mater

    DOT National Transportation Integrated Search

    2014-04-01

    A correlation between Wavelength Dispersive X-ray Fluorescence(WDXRF) analysis of Hardened : Concrete for Chlorides and Atomic Absorption (AA) analysis (current method AASHTO T-260, procedure B) has been : found and a new method of analysis has been ...

  20. 25 CFR 170.810 - To what standards must an IRR transportation facility be maintained?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.810 To what standards must an IRR... standards; (b) AASHTO road and bridge maintenance manuals, latest edition; or (c) Other applicable Federal, State, tribal, or local government maintenance standards as may be negotiated in an ISDEAA road...

  1. 23 CFR 625.4 - Standards, policies, and standard specifications.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ...) Pavement Design, refer to 23 CFR part 626. (b) Bridges and structures. (1) Standard Specifications for... TRAFFIC OPERATIONS DESIGN STANDARDS FOR HIGHWAYS § 625.4 Standards, policies, and standard specifications.... (a) Roadway and appurtenances. (1) A Policy on Geometric Design of Highways and Streets, AASHTO 2001...

  2. 23 CFR 625.4 - Standards, policies, and standard specifications.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ...) Pavement Design, refer to 23 CFR part 626. (b) Bridges and structures. (1) Standard Specifications for... TRAFFIC OPERATIONS DESIGN STANDARDS FOR HIGHWAYS § 625.4 Standards, policies, and standard specifications.... (a) Roadway and appurtenances. (1) A Policy on Geometric Design of Highways and Streets, AASHTO 2001...

  3. 23 CFR 625.4 - Standards, policies, and standard specifications.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ...) Pavement Design, refer to 23 CFR part 626. (b) Bridges and structures. (1) Standard Specifications for... TRAFFIC OPERATIONS DESIGN STANDARDS FOR HIGHWAYS § 625.4 Standards, policies, and standard specifications.... (a) Roadway and appurtenances. (1) A Policy on Geometric Design of Highways and Streets, AASHTO 2001...

  4. 23 CFR 625.4 - Standards, policies, and standard specifications.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...) Pavement Design, refer to 23 CFR part 626. (b) Bridges and structures. (1) Standard Specifications for... TRAFFIC OPERATIONS DESIGN STANDARDS FOR HIGHWAYS § 625.4 Standards, policies, and standard specifications.... (a) Roadway and appurtenances. (1) A Policy on Geometric Design of Highways and Streets, AASHTO 2001...

  5. 23 CFR 625.4 - Standards, policies, and standard specifications.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ...) Pavement Design, refer to 23 CFR part 626. (b) Bridges and structures. (1) Standard Specifications for... TRAFFIC OPERATIONS DESIGN STANDARDS FOR HIGHWAYS § 625.4 Standards, policies, and standard specifications.... (a) Roadway and appurtenances. (1) A Policy on Geometric Design of Highways and Streets, AASHTO 2001...

  6. Three Bridge Fryer's Ford Bridge, Nimrod Bridge, and Ward's ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Three Bridge - Fryer's Ford Bridge, Nimrod Bridge, and Ward's Crossing Bridge - Fryer's Ford Bridge, Spanning East Fork of Point Remove Creek at Fryer Bridge Road (CR 67), Solgohachia, Conway County, AR

  7. Section 3: Optimization of a 550/690-MPa high-performance bridge steel

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Magee, A.B.; Gross, J.H.; Stout, R.D.

    1997-04-01

    This project to develop a high-performance bridge steel was intended to avoid susceptibility of the steel to weld heat-affected-zone cracking and therefore minimize the requirement for preheat, and to increase its fracture toughness at service temperatures. Previous studies by the Lehigh University Center for Advanced Technology for Large Structural Systems have suggested that a Cu-Ni steels with the following composition was an excellent candidate for such a bridge steel: C/0.070; Mn/1.50; P/0.009; S/0.005; Si/0.25; Cu/1.00; Ni/0.75; Cr/0.50; Mo/0.50; V/0.06; Cb/0.010. To confirm that observation, 227-kg heats of the candidate steel were melted and processed to 25- and 50-mm-thick plate bymore » various thermomechanical practices, and the weldability and mechanical properties determined. To evaluate the feasibility of reduced alloy content, two 227-kg heats of a lower hardenability steel were melted with C reduced to 0.06, Mn to 1.25, and Mo to 0.25 and similarly processed and tested. The results indicate that the steels were not susceptible to hydrogen-induced weld-heat-affected-zone cracking when welded without preheat. Jominy end-quench tests of the higher-hardenability steel indicate that a minimum yield-strength of 690 MPa should be readily attainable in thicknesses through 50 mm and marginally at 100 mm. The toughness of the steel readily met AASHTO specifications for Zone 3 in all conditions and thicknesses, and may be sufficiently tough so that the critical crack size will minimize fatigue-crack-extension problems.« less

  8. Post-tensioning and splicing of precast/prestressed bridge beams to extend spans

    NASA Astrophysics Data System (ADS)

    Collett, Brandon S.; Saliba, Joseph E.

    2002-06-01

    This paper explores the status and techniques of post-tensioning and splicing precast concrete I-beams in bridge applications. It will look at the current practices that have been used in the United States and comment on the advantages of these techniques. Representative projects are presented to demonstrate the application and success of specific methods used. To demonstrate the benefits of using post-tensioning and splicing to extend spans, multiple analysis of simple span post-tensioned I-beams were performed varying such characteristics as beam spacing, beam sections, beam depth and concrete strength. Tables were then developed to compare the maximum span length of a prestressed I-beam versus a one segment or a spliced three segment post-tensioned I-beam. The lateral stability of the beam during fabrication, transportation and erection is also examined and discussed. These tables are intended to aid designers and owners in preliminary project studies to determine if post-tensioning can be beneficial to their situation. AASHTO Standard Specifications(2) will be used as basic guidelines and specifications. In many cases, post-tensioning was found to extend the maximum span length of a typical 72-inch precast I-beam more than 40 feet over conventional prestress.

  9. Development of a MASH TL-2 guardrail-to-bridge rail transition compatible with 31-inch guardrail.

    DOT National Transportation Integrated Search

    2011-12-01

    The TxDOT Design Division is in the process of developing new guardrail standards that comply with the AASHTO Manual for Assessing Safety Hardware (MASH). The new guardrail system will provide increased capacity and improved impact performance relati...

  10. Roy D. Bridges Bridge

    NASA Image and Video Library

    2003-08-06

    From left, incoming KSC Director James W. Kennedy looks on as departing KSC Director Roy D. Bridges Jr. shakes hands with the 45th Space Wing Commander Brig. Gen. J. Gregory Pavlovich. The occasion is the unveiling of the new sign on the NASA Causeway naming the bridge for Bridges who is leaving KSC to become the director of NASA's Langley Research Center, Hampton, Va. The bridge spans the Banana River on the NASA Causeway and connects Kennedy Space Center and Cape Canaveral Air Force Station.

  11. 47 CFR 80.1007 - Bridge-to-bridge radiotelephone installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Bridge-to-bridge radiotelephone installation. 80.1007 Section 80.1007 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND... Bridge-to-Bridge Act § 80.1007 Bridge-to-bridge radiotelephone installation. Use of the bridge-to-bridge...

  12. 47 CFR 80.1007 - Bridge-to-bridge radiotelephone installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Bridge-to-bridge radiotelephone installation. 80.1007 Section 80.1007 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND... Bridge-to-Bridge Act § 80.1007 Bridge-to-bridge radiotelephone installation. Use of the bridge-to-bridge...

  13. Strain limits for concrete filled steel tubes in AASHTO seismic provisions.

    DOT National Transportation Integrated Search

    2013-08-01

    Reinforced concrete filled steel tubes (RCFSTs) are commonly used as bridge pipe piles in high seismic regions. The pipe piles in high : seismic regions. The pipe-piles consist of reinforced concrete encased in a steel tube. The steel tube is used as...

  14. 47 CFR 80.331 - Bridge-to-bridge communication procedure.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Bridge-to-bridge communication procedure. 80..., Alarm, Urgency and Safety Procedures § 80.331 Bridge-to-bridge communication procedure. (a) Vessels subject to the Bridge-to-Bridge Act transmitting on the designated navigational frequency must conduct...

  15. 47 CFR 80.331 - Bridge-to-bridge communication procedure.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Bridge-to-bridge communication procedure. 80..., Alarm, Urgency and Safety Procedures § 80.331 Bridge-to-bridge communication procedure. (a) Vessels subject to the Bridge-to-Bridge Act transmitting on the designated navigational frequency must conduct...

  16. BridgePBEE | BridgePBEE

    Science.gov Websites

    jacking Item 22: Bridge removal (column) Item 23: Bridge removal (portion) Item 24: Approach slab removal for: Search Menu Log in Register PEER Center - 325 Davis Hall, University of California, Berkeley, CA

  17. Embedded data collector (EDC) phase II load and resistance factor design (LRFD) : [summary].

    DOT National Transportation Integrated Search

    2015-07-01

    Piles that support bridge structures are designed for the specific site characteristics and loads : that the piles are expected to bear. In Florida, driven piles are monitored during installation : (dynamically tested) to assess resistance, com...

  18. Myocardial Bridge

    MedlinePlus

    ... Center > Myocardial Bridge Menu Topics Topics FAQs Myocardial Bridge En español Your heart is made of muscle, ... surface of the heart. What is a myocardial bridge? A myocardial bridge is a band of heart ...

  19. An improved bridge safety index for narrow bridges.

    DOT National Transportation Integrated Search

    1983-08-01

    In this report, a new bridge safety index is developed based upon an extensive : statistical study of accident data on 78 bridges. A total of 655 accidents : were recorded at these bridges over the six-year period between 1974 and 1979. : Cluster ana...

  20. Association of Patient-Reported Readiness for Discharge and Hospital Consumer Assessment of Health Care Providers and Systems Patient Satisfaction Scores: A Retrospective Analysis.

    PubMed

    Schmocker, Ryan K; Holden, Sara E; Vang, Xia; Leverson, Glen E; Cherney Stafford, Linda M; Winslow, Emily R

    2015-12-01

    Patient-reported outcomes (PRO) have been increasingly emphasized, however, determining clinically valuable PRO has been problematic and investigation limited. This study examines the association of readiness for discharge, which has been described previously, with patient satisfaction and readmission. Data from adult patients admitted to our institution from 2009 to 2012 who completed both the Hospital Consumer Assessment of Healthcare Providers and Systems and the Press Ganey surveys post discharge were extracted from an existing database of patients (composed of 220 patients admitted for small bowel obstruction and 98 patients with hospital stays ≥ 21 days). Using the survey question, "Did you feel ready for discharge?" (RFD), 2 groups were constructed, those RFD and those with lesser degrees of readiness (ie, less ready for discharge [LRFD]) using topbox methodology. Outcomes, readmission rates, and satisfaction were compared between RFD and LRFD groups. Three hundred and eighteen patients met the inclusion criteria; 45% were female and 94% were Caucasian. Median age was 62.3 years (interquartile range 52.5 to 70.8 year). Median length of stay was 10 days (interquartile range 6.0 to 24.0 days) and 69.2% were admitted with small bowel obstruction. The 30-day readmission rate was 14.3% and 55% indicated they were RFD. Those RFD and LRFD had similar demographics, comorbidity scores, and rates of surgery. Those RFD had higher overall hospital satisfaction (87.3% RFD vs 62.4% LRFD; p < 0.001), higher physician communication scores (median 3.0 RFD vs 2.0 LRFD; p < 0.001), and higher nursing communication scores (median 3.0 RFD vs 2.0 LRFD, p < 0.001). Readmission rates were similar between the groups (11.4% RFD vs 18.2% LRFD; p = 0.09). Readiness for discharge appears to be a clinically useful patient-reported metric, as those RFD have higher satisfaction with the hospital and physicians. Prospective investigation into variables affecting patient satisfaction in

  1. 28. BRIDGE NO. 9 APRON AND BRIDGE HINGE JOINT AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    28. BRIDGE NO. 9 APRON AND BRIDGE HINGE JOINT AND BRIDGE SUSPENSION SYSTEM SHOWING EYEBAR AND CABLE CONNECTIONS. LOOKING WEST. - Greenville Yard, Transfer Bridge System, Port of New York/New Jersey, Upper New York Bay, Jersey City, Hudson County, NJ

  2. Bridge permeameter

    DOEpatents

    Graf, Darin C.; Warpinski, Norman R.

    1996-01-01

    A system for single-phase, steady-state permeability measurements of porous rock utilizes a fluid bridge arrangement analogous to a Wheatstone bridge. The arms of the bridge contain the sample and calibrated flow resistors.

  3. 29. BRIDGE NO. 13 APRON AND BRIDGE HINGE JOINT AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    29. BRIDGE NO. 13 APRON AND BRIDGE HINGE JOINT AND BRIDGE SUSPENSION SYSTEM (OLDER STYLE) SHOWING EYEBAR AND CABLE CONNECTIONS. LOOKING WEST. - Greenville Yard, Transfer Bridge System, Port of New York/New Jersey, Upper New York Bay, Jersey City, Hudson County, NJ

  4. 5. View of Clark Fork Vehicle Bridge facing east. Bridge ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. View of Clark Fork Vehicle Bridge facing east. Bridge from south shore of Clark Fork River-southernmost span. 1900-era Northern Pacific Railway Bridge in background. - Clark Fork Vehicle Bridge, Spanning Clark Fork River, serves Highway 200, Clark Fork, Bonner County, ID

  5. Bridge permeameter

    DOEpatents

    Graf, D.C.; Warpinski, N.R.

    1996-08-13

    A system is described for single-phase, steady-state permeability measurements of porous rock which utilizes a fluid bridge arrangement analogous to a Wheatstone bridge. The arms of the bridge contain the sample and calibrated flow resistors. 8 figs.

  6. Bridge permeameter

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Graf, D.C.; Warpinski, N.R.

    A system is described for single-phase, steady-state permeability measurements of porous rock which utilizes a fluid bridge arrangement analogous to a Wheatstone bridge. The arms of the bridge contain the sample and calibrated flow resistors. 8 figs.

  7. Long-term bridge performance high priority bridge performance issues.

    DOT National Transportation Integrated Search

    2014-10-01

    Bridge performance is a multifaceted issue involving performance of materials and protective systems, : performance of individual components of the bridge, and performance of the structural system as a whole. The : Long-Term Bridge Performance (LTBP)...

  8. OVERVIEW OF BRIDGES WITH WAIKELE CANAL BRIDGE IN CENTER, OR&L ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    OVERVIEW OF BRIDGES WITH WAIKELE CANAL BRIDGE IN CENTER, OR&L BRIDGE IN BACKGROUND. SHOWING THE EARTHEN INCLINE THAT RAISES FARRINGTON HIGHWAY OVER THE FORMER OR&L TRACKS. NOTE THE 1963 WESTBOUND BRIDGE IN THE FOREGROUND. VIEW FACING EAST. - Waikele Canal Bridge and Highway Overpass, Farrington Highway and Waikele Stream, Waipahu, Honolulu County, HI

  9. 47 CFR 80.163 - Operator requirements of the Bridge-to-Bridge Act.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Operator requirements of the Bridge-to-Bridge... Requirements § 80.163 Operator requirements of the Bridge-to-Bridge Act. Each ship subject to the Bridge-to-Bridge Act must have on board a radio operator who holds a restricted radiotelephone operator permit or...

  10. 47 CFR 80.163 - Operator requirements of the Bridge-to-Bridge Act.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Operator requirements of the Bridge-to-Bridge... Requirements § 80.163 Operator requirements of the Bridge-to-Bridge Act. Each ship subject to the Bridge-to-Bridge Act must have on board a radio operator who holds a restricted radiotelephone operator permit or...

  11. Kinetic bridges.

    DOT National Transportation Integrated Search

    1980-01-01

    This report on kinetic bridges is essentially a state-of-the-art study on two types of bridges whose location or physical characteristics are designed to be time dependent. The first type, called a "relocatable bridge", is essentially for use as a te...

  12. Bridge health monitoring metrics : updating the bridge deficiency algorithm.

    DOT National Transportation Integrated Search

    2009-10-01

    As part of its bridge management system, the Alabama Department of Transportation (ALDOT) must decide how best to spend its bridge replacement funds. In making these decisions, ALDOT managers currently use a deficiency algorithm to rank bridges that ...

  13. Guardrails for use on historic bridges: volume 2--bridge deck overhang design.

    DOT National Transportation Integrated Search

    2016-11-01

    Bridges that are designated historic present a special challenge to bridge engineers whenever rehabilitation work or improvements are : made to the bridges. Federal and state laws protect historically significant bridges, and railings on these bridge...

  14. 47 CFR 80.309 - Watch required by the Bridge-to-Bridge Act.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Watch required by the Bridge-to-Bridge Act. 80... Safety Watches § 80.309 Watch required by the Bridge-to-Bridge Act. In addition to the watch requirement contained in § 80.148, all vessels subject to the Bridge-to-Bridge Act must keep a watch on the designated...

  15. 47 CFR 80.309 - Watch required by the Bridge-to-Bridge Act.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Watch required by the Bridge-to-Bridge Act. 80... Safety Watches § 80.309 Watch required by the Bridge-to-Bridge Act. In addition to the watch requirement contained in § 80.148, all vessels subject to the Bridge-to-Bridge Act must keep a watch on the designated...

  16. 1. View of bridge from Interstate 195 (Washington Bridge) looking ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. View of bridge from Interstate 195 (Washington Bridge) looking southwest - India Point Railroad Bridge, Spanning Seekonk River between Providence & East Providence, Providence, Providence County, RI

  17. Field performance of timber bridges. 7, Connell Lake stress-laminated deck bridge

    Treesearch

    L. E. Hislop; M. A. Ritter

    The Connell Lake bridge was constructed in early 1991 on the Tongass National Forest, Alaska, as a demonstration bridge under the Timber Bridge Initiative. The bridge is a stress-laminated deck structure with an approximate 36-ft length and 18-ft width and is the first known stress-laminated timber bridge constructed in Alaska. Performance of the bridge was monitored...

  18. GOETHALS BRIDGE FROM NORTH SIDE OVER ARTHUR KILL. RAILROAD BRIDGE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    GOETHALS BRIDGE FROM NORTH SIDE OVER ARTHUR KILL. RAILROAD BRIDGE IN FOREGROUND - Goethals Bridge, Spanning Arthur Kill from New Jersey to Staten Island, Staten Island (subdivision), Richmond County, NY

  19. LOOKING WEST, BETWEEN READING DEPOT BRIDGE AND SKEW ARCH BRIDGE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    LOOKING WEST, BETWEEN READING DEPOT BRIDGE AND SKEW ARCH BRIDGE (HAER No. PA-116). - Philadelphia & Reading Railroad, Reading Depot Bridge, North Sixth Street at Woodward Street, Reading, Berks County, PA

  20. Plans: Poop Deck, Boat Deck, Housetop, Bridge Deck, Upper Bridge ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Plans: Poop Deck, Boat Deck, Housetop, Bridge Deck, Upper Bridge Deck, Navigating Bridge, Forecastle Deck, Upper Deck, Second Deck and Hold - Saugatuck, James River Reserve Fleet, Newport News, Newport News, VA

  1. 1. VIEW OF SWING BRIDGE FROM KEDZIE AVENUE BRIDGE, LOOKING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. VIEW OF SWING BRIDGE FROM KEDZIE AVENUE BRIDGE, LOOKING EAST. - Chicago, Madison & Northern Railroad, Sanitary & Ship Canal Bridge, Spanning Sanitary & Ship Canal, east of Kedzie Avenue, Chicago, Cook County, IL

  2. 3. View of Clark Fork Vehicle Bridge facing southwest. Bridge ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. View of Clark Fork Vehicle Bridge facing southwest. Bridge from north shore of Clark Fork River. - Clark Fork Vehicle Bridge, Spanning Clark Fork River, serves Highway 200, Clark Fork, Bonner County, ID

  3. OVERVIEW OF BRIDGES WITH OR&L BRIDGE IN CENTER, WAIKELE CANAL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    OVERVIEW OF BRIDGES WITH OR&L BRIDGE IN CENTER, WAIKELE CANAL BRIDGE IN BACKGROUND. SHOWING THE EARTHEN INCLINE THAT RAISES FARRINGTON HIGHWAY OVER THE FORMER OR&L TRACKS. VIEW FACING SOUTHWEST. - Waikele Canal Bridge and Highway Overpass, Farrington Highway and Waikele Stream, Waipahu, Honolulu County, HI

  4. 4. View of Clark Fork Vehicle Bridge facing northeast. Bridge ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. View of Clark Fork Vehicle Bridge facing northeast. Bridge from south shoreof Clark Fork River showing 4 spans. - Clark Fork Vehicle Bridge, Spanning Clark Fork River, serves Highway 200, Clark Fork, Bonner County, ID

  5. 2. View of Clark Fork Vehicle Bridge facing northeast. Bridge ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. View of Clark Fork Vehicle Bridge facing northeast. Bridge from south shore of Clark Fork River showing 4 1/2 spans. - Clark Fork Vehicle Bridge, Spanning Clark Fork River, serves Highway 200, Clark Fork, Bonner County, ID

  6. 7. View of Clark Fork Vehicle Bridge facing northwest. Bridge ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. View of Clark Fork Vehicle Bridge facing northwest. Bridge from south shore of Clark Fork River showing 4 1/2 spans. - Clark Fork Vehicle Bridge, Spanning Clark Fork River, serves Highway 200, Clark Fork, Bonner County, ID

  7. 4. View of bridge deck from northeast approach (bridge deck ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. View of bridge deck from northeast approach (bridge deck from southwest approach is virtually identical - Big Cottonwood River Bridge No. 246, Spanning Big Cottonwood River at Cottonwood Street (City Road No. 165), New Ulm, Brown County, MN

  8. NYSDOT Bridge Deck Task Force evaluation of bridge deck cracking on NYSDOT bridges

    DOT National Transportation Integrated Search

    2007-02-01

    This paper presents a summary of knowledge gained by the NYSDOT Bridge Deck Task Force (BDTF). Although the paper contains recommendations to reduce the prevalence and severity of bridge deck cracking, it does not include a silver bullet soluti...

  9. Field performance of timber bridges. 4, Graves Crossing stress-laminated deck bridge

    Treesearch

    J. P. Wacker; M. A. Ritter

    The Graves Crossing bridge was constructed October 1991 in Antrim County, Michigan, as part of the demonstration timber bridge program sponsored by the USDA Forest Service. The bridge is a two-span continuous, stress-laminated deck superstructure and it is 36-ft long and 26-ft wide. The bridge is one of the first stress-laminated deck bridges to be built of sawn lumber...

  10. Bridges in complex networks

    NASA Astrophysics Data System (ADS)

    Wu, Ang-Kun; Tian, Liang; Liu, Yang-Yu

    2018-01-01

    A bridge in a graph is an edge whose removal disconnects the graph and increases the number of connected components. We calculate the fraction of bridges in a wide range of real-world networks and their randomized counterparts. We find that real networks typically have more bridges than their completely randomized counterparts, but they have a fraction of bridges that is very similar to their degree-preserving randomizations. We define an edge centrality measure, called bridgeness, to quantify the importance of a bridge in damaging a network. We find that certain real networks have a very large average and variance of bridgeness compared to their degree-preserving randomizations and other real networks. Finally, we offer an analytical framework to calculate the bridge fraction and the average and variance of bridgeness for uncorrelated random networks with arbitrary degree distributions.

  11. Investigation of pile setup (freeze) in Alabama : development of a setup prediction method and implementation into LRFD driven pile design.

    DOT National Transportation Integrated Search

    2015-06-01

    The Alabama Department of Transportation (ALDOT) often uses deep foundations : consisting of driven piles, particularly in the southern half of the state, to support bridges or other : highway structures. In the fiscal year 2012, a total of 22 bridge...

  12. The hepatic bridge.

    PubMed

    Sugarbaker, Paul H

    2018-07-01

    The hepatic bridge forms a tunnel of liver parenchyma that may obscure peritoneal metastases associated with the round ligament. Visualization and then resection of nodules associated with this structure is necessary. The incidence of a hepatic bridge and the extent that it covered the round ligament was determined in consecutive patients. Extent of coverage of the round ligament by the hepatic bridge was determined: Class 1 indicates up to one-third of the round ligament obscured, Class 2 up to two-thirds and Class 3 more than two-thirds. In 102 patients in whom the round ligament of the liver could be completely visualized, 50 had a hepatic bridge. Class 1 was 22 (44%) of the bridges, Class 2 was 16 (32%) and Class 3 was 12 (24%). A hepatic bridge was more frequently present in 28 of 45 male patients (62%) vs. 22 of 57 female patients (38%). Approximately one-half of our patients having cytoreductive surgery for peritoneal metastases were observed to have a hepatic bridge. Up to 56% of these patients have Class 2 or 3 hepatic bridge and may require division of the hepatic bridge to completely visualize the contents of the tunnel created by this structure. Copyright © 2018 Elsevier Ltd, BASO ~ The Association for Cancer Surgery, and the European Society of Surgical Oncology. All rights reserved.

  13. Bridge resource program.

    DOT National Transportation Integrated Search

    2013-09-01

    The mission of Rutgers Universitys Center for Advanced Infrastructure and Transportation (CAIT) Bridge Resource Program (BRP) is to provide bridge engineering support to the New Jersey Department of Transportation (NJDOT)s Bridge Engineering an...

  14. NCDOT : bridge policy

    DOT National Transportation Integrated Search

    1994-11-01

    NCDOTs Bridge Policy establishes controlling design elements for new and reconstructed bridges on the state road system. It includes information to address sidewalks and bicycle facilities on bridges, including minimum handrail heights and sidewal...

  15. Bridged graphite oxide materials

    NASA Technical Reports Server (NTRS)

    Herrera-Alonso, Margarita (Inventor); McAllister, Michael J. (Inventor); Aksay, Ilhan A. (Inventor); Prud'homme, Robert K. (Inventor)

    2010-01-01

    Bridged graphite oxide material comprising graphite sheets bridged by at least one diamine bridging group. The bridged graphite oxide material may be incorporated in polymer composites or used in adsorption media.

  16. 50. INTERIOR OF BRIDGE SUSPENSION STRUCTURE ABOVE BRIDGE NOS. 10 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    50. INTERIOR OF BRIDGE SUSPENSION STRUCTURE ABOVE BRIDGE NOS. 10 AND 9 SHOWING CABLE COUNTERWEIGHT SYSTEM AND SCREW-TYPE VERTICAL ADJUSTMENT MACHINERY (LIFTING SCREWS). LOOKING NORTH. - Greenville Yard, Transfer Bridge System, Port of New York/New Jersey, Upper New York Bay, Jersey City, Hudson County, NJ

  17. 16. LOG AND PLANK BRIDGE ON ACCESS ROAD NEAR BRIDGE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. LOG AND PLANK BRIDGE ON ACCESS ROAD NEAR BRIDGE SITE; SAME STRUCTURE AS SHOWN IN PHOTO #12. ZION NP NEGATIVE NO. 967 ZIO. - Zion-Mount Carmel Highway, Virgin River Bridge, Spanning North Fork of Virgin River on Zion-Mount Carmel Highway, Springdale, Washington County, UT

  18. Laboratory and field testing of an accelerated bridge construction demonstration bridge : US Highway 6 bridge over Keg Creek.

    DOT National Transportation Integrated Search

    2013-04-01

    The US Highway 6 Bridge over Keg Creek outside of Council Bluffs, Iowa is a demonstration bridge site chosen to put into practice : newly-developed Accelerated Bridge Construction (ABC) concepts. One of these new concepts is the use of prefabricated ...

  19. Instrumentation to Aid in Steel Bridge Fabrication : Bridge Virtual Assembly System

    DOT National Transportation Integrated Search

    2018-05-01

    This pool funded project developed a BRIDGE VIRTUAL ASSEMBLY SYSTEM (BRIDGE VAS) that improves manufacturing processes and enhances quality control for steel bridge fabrication. The system replaces conventional match-drilling with virtual assembly me...

  20. Dynamic assessment of bridge deck performance considering realistic bridge-traffic interaction

    DOT National Transportation Integrated Search

    2017-09-01

    Concrete bridge decks are directly exposed to daily traffic loads and may experience some surface cracking caused by excessive stress or fatigue accumulation, which requires repair or replacement. Among typical bridges in North America, bridge decks ...

  1. BRIDGE BUILDER WILLIAM FLINN’S “CAMP & BRIDGE BUILDING OUTFIT”. INTERIOR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    BRIDGE BUILDER WILLIAM FLINN’S “CAMP & BRIDGE BUILDING OUTFIT”. INTERIOR VIEW SHOWING LABORERS AT MEAL TIME. - Clear Fork of Brazos River Suspension Bridge, Spanning Clear Fork of Brazos River at County Route 179, Albany, Shackelford County, TX

  2. Notable unbuilt bridges.

    DOT National Transportation Integrated Search

    1988-01-01

    Described and discussed in this exposition are a number of unusual or notable bridges proposed in this century that for various reasons were not built. Emphasis is placed on bridges in the United States, although some bridges in other countries are a...

  3. Field performance of timber bridges. 6, Hoffman Run stress-laminated deck bridge

    Treesearch

    M. A. Ritter; P. D. Hilbrich Lee; G. J. Porter

    The Hoffman Run bridge, located just outside Dahoga, Pennsylvania, was constructed in October 1990. The bridge is a simple-span, single-lane, stress-laminated deck superstructure that is approximately 26 ft long and 16 ft wide. It is the second stress-laminated timber bridge to be constructed of hardwood lumber in Pennsylvania. The performance of the bridge was...

  4. Bridge Programs in Illinois: Results of the 2010 Illinois Bridge Status Survey

    ERIC Educational Resources Information Center

    Taylor, J. L.; Harmon, T.

    2010-01-01

    This report provides a summary of major results of the Illinois Bridge Status Survey, administered online between April and June 2010. The purpose of the survey was to understand the extent to which bridge programs are being implemented in Illinois, as well as to build an online directory of bridge programs. Bridge programs are an emerging…

  5. Parryville Bridge (S.R. 2008, section 01B Bridge) looking north across ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Parryville Bridge (S.R. 2008, section 01B Bridge) looking north across traffic level, showing village of Parryville. - Parryville Bridge, State Route 2008 over Pohapoco Creek, Parryville, Carbon County, PA

  6. Bridge deterioration models to support Indiana's bridge management system.

    DOT National Transportation Integrated Search

    2016-02-01

    An effective bridge management system that is equipped with reliable deterioration models enables agency engineers to carry out : monitoring and long-term programming of bridge repair actions. At the project level, deterioration models help the agenc...

  7. Field Performance of Timber Bridges. 16: North Siwell Road Stress-Laminated Bridge

    DOT National Transportation Integrated Search

    1998-03-01

    This report is 16th in a series of reports that documents the : field performance of timber bridges. The North Siwell Road bridge was constructed during December 1994 in Hinds County, Mississippi. The bridge is a single span, stress laminated T-beam ...

  8. Performance Assessment of Bridges Using GPS: The Juarez Bridge in Culiacan, Mexico

    NASA Astrophysics Data System (ADS)

    Vazquez, G. E.; Gaxiola-Camacho, J. R.; Trejo, M.; Echagaray, J.; Guzman, G. M.

    2015-12-01

    Performance assessment of bridges has become very important during recent years. Bridges around the world are aging, leading to the incorporation of efficient, reliable, and economic evaluation procedures. These techniques must assess properly the performance of bridges under several loading conditions in a real manner, representing the physics of the problem. Among several approaches, Global Positioning System (GPS) can be intelligently used for the performance evaluation of bridges. We focused on GPS, since it naturally produces position estimates as compared to seismic instruments that record either velocity or acceleration, and thus require an integration. There are several reasons that make the Juarez Bridge a case of study for evaluation: it is approximately 45 years old, it is a reinforced concrete structure, it connects two significant zones of the city, and its spans is closely to 200 meters long. In addition, thousands of vehicles and pedestrians use the Juarez Bridge every day, which make feasible the GPS performance assessment. Hence, in order to produce optimal position estimates, GPS data were collected during two consecutive hours at three different periods of the day for a whole week (Monday through Sunday), to represent three critical limit states of the bridge (mid-span and end-spans). GPS data were processed using the GAMIT/GLOBK software, considering 1-second sampling rate, 15-degree cutoff angle, ionosphere-free double-differenced (DD) carrier phase method, and precise final orbits disseminated by IGS (International GNSS Service). The displacements obtained from the above discussed procedure are compared with allowable values documented in bridge construction manuals. Reliability theory was used to evaluate the probability of failure of the bridge for the three periods of the day. In addition, a conclusion was made about the most risky day of the week for the use of the Juarez Bridge. It is expected that the results from the proposed research

  9. Field performance of timber bridges. 9, Big Erick`s stress-laminated deck bridge

    Treesearch

    J. A. Kainz; J. P. Wacker; M. Nelson

    The Big Erickas bridge was constructed during September 1992 in Baraga County, Michigan. The bridge is 72 ft long, 16 ft wide, and consists of three simple spans: two stress-laminated deck approach spans and a stress-laminated box center span. The bridge is unique in that it is one of the first known stress-laminated timber bridge applications to use Eastern Hemlock...

  10. Field performance of timber bridges. 5, Little Salmon Creek stress-laminated deck bridge

    Treesearch

    M. A. Ritter; J. A. Kainz; G. J. Porter

    The Little Salmon Creek bridge was constructed in November 1988 on the Allegheny National Forest in Pennsylvania. The bridge is a simple span, single-lane, stress-laminated deck superstructure that is approximately 26-ft long and 16-ft wide. The bridge is unique in that it is the first known stress-laminated timber bridge to be constructed of hardwood lumber. The...

  11. Improving bridge load rating accuracy.

    DOT National Transportation Integrated Search

    2013-06-01

    Nearly one-quarter of Alabamas bridges are deemed structurally deficient or functionally obsolete. An : additional seven percent of Alabamas bridges were posted bridges in 2010. (Federal Highway Administration, : 2011) Accurate bridge load rati...

  12. Hydraulic modeling of flow impact on bridge structures: a case study on Citarum bridge

    NASA Astrophysics Data System (ADS)

    Siregar, R. I.

    2018-02-01

    Flood waves because of the rapid catchment response to high intense rainfall, breaches of flood defenses may induce huge impact forces on structures, causing structural damage or even failures. Overflowing stream that passes over the bridge, it means to discharge flood water level is smaller than the capacity of the river flow. In this study, the researches present the methodological approach of flood modeling on bridge structures. The amount of force that obtained because of the hydrostatic pressure received by the bridge at the time of the flood caused the bridge structure disrupted. This paper presents simulation of flow impact on bridge structures with some event flood conditions. Estimating the hydrostatic pressure developed new model components, to quantify the flow impact on structures. Flow parameters applied the model for analyzing, such as discharge, velocity, and water level or head that effect of bridge structures. The simulation will illustrate the capability of bridge structures with some event flood river and observe the behavior of the flow that occurred during the flood. Hydraulic flood modeling use HEC-RAS for simulation. This modeling will describe the impact on bridge structures. Based on the above modelling resulted, in 2008 has flood effect more than other years on the Citarum Bridge, because its flow overflow on the bridge.

  13. Evaluation of dynamic shear rheometer tests for emulsions : [tech summary].

    DOT National Transportation Integrated Search

    2014-12-01

    Currently, the Louisiana Department of Transportation and Development (DOTD) requires ductility tests at 25C according to : AASHTO T51 for emulsions, force ductility ratio at 4C, and elastic recovery at 10C according to AASHTO T300 and AASHTO :...

  14. North Dakota implementation of mechanistic-empirical pavement design guide (MEPDG).

    DOT National Transportation Integrated Search

    2014-12-01

    North Dakota currently designs roads based on the AASHTO Design Guide procedure, which is based on : the empirical findings of the AASHTO Road Test of the late 1950s. However, limitations of the current : empirical approach have prompted AASHTO to mo...

  15. Development of bridge girder movement criteria for accelerated bridge construction.

    DOT National Transportation Integrated Search

    2014-06-01

    End diaphragms connect multiple girders to form a bridge superstructure system for effective resistance to earthquake loads. Concrete : girder bridges that include end diaphragms consistently proved to perform well during previous earthquake events. ...

  16. Diode-quad bridge circuit means

    NASA Technical Reports Server (NTRS)

    Harrison, D. R.; Dimeff, J. (Inventor)

    1975-01-01

    Diode-quad bridge circuit means is described for use as a transducer circuit or as a discriminator circuit. It includes: (1) a diode bridge having first, second, third, and fourth bridge terminals consecutively coupled together by four diodes polarized in circulating relationship; (2) a first impedance connected between the second bridge terminal and a circuit ground; (3) a second impedance connected between the fourth bridge terminal and the circuit ground; (4) a signal source having a first source terminal capacitively coupled to the first and third bridge terminals, and a second source terminal connected to the circuit ground; and (5) an output terminal coupled to the first bridge terminal and at which an output signal may be taken.

  17. 4. VIEW OF SILVER BRIDGE (ST. MARY'S BRIDGE), CARRYING COUNTY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. VIEW OF SILVER BRIDGE (ST. MARY'S BRIDGE), CARRYING COUNTY ROAD OVER SOURIS RIVER NEAR SOUTH END OF REFUGE, LOOKING NORTHEAST - Upper Souris National Wildlife Refuge Dams, Souris River Basin, Foxholm, Surrey (England), ND

  18. Dog Bridge, view of the deck of the bridge and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Dog Bridge, view of the deck of the bridge and rails looking from Linden Lane - National Park Seminary, Bounded by Capitol Beltway (I-495), Linden Lane, Woodstove Avenue, & Smith Drive, Silver Spring, Montgomery County, MD

  19. 2. DETAIL OF KLINGLE ROAD BRIDGE AND PATHWAY BRIDGE CROSSINGS. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. DETAIL OF KLINGLE ROAD BRIDGE AND PATHWAY BRIDGE CROSSINGS. AERIAL VIEW OF BEACH DRIVE AT INTERSECTION OF KLINGLE ROAD AND PORTER STREET. VIEW NE. - Rock Creek Park Road System, Washington, District of Columbia, DC

  20. Load ratings for secondary bridges.

    DOT National Transportation Integrated Search

    1991-05-01

    A load rating states the load in tons which a vehicle can impose on a bridge. : Changes in guidelines, standards, and customary uses of bridges require : analyses of bridges to be updated and re-evaluated. : In this report, twenty-two secondary bridg...

  1. Akashi Kaikyo Bridge, Japan

    NASA Image and Video Library

    2013-03-25

    NASA Terra spacecraft shows the Akashi Kaikyo Bridge or Pearl Bridge, the longest central span of any suspension bridge in the world, at 1991 meters, connecting the city of Kobe, Japan with Iwaja on Awaji Island by crossing the busy Akashi Strait.

  2. Morphological aspects of myocardial bridges.

    PubMed

    Lujinović, Almira; Kulenović, Amela; Kapur, Eldan; Gojak, Refet

    2013-11-01

    Although some myocardial bridges can be asymptomatic, their presence often causes coronary disease either through direct compression of the "tunnel" segment or through stimulation and accelerated development of atherosclerosis in the segment proximally to the myocardial bridge. The studied material contained 30 human hearts received from the Department of Anatomy. The hearts were preserved 3 to 5 days in 10% formalin solution. Thereafter, the fatty tissue was removed and arterial blood vessels prepared by careful dissection with special reference to the presence of the myocardial bridges. Length and thickness of the bridges were measured by the precise electronic caliper. The angle between the myocardial bridge fibre axis and other axis of the crossed blood vessel was measured by a goniometer. The presence of the bridges was confirmed in 53.33% of the researched material, most frequently (43.33%) above the anterior interventricular branch. The mean length of the bridges was 14.64 ± 9.03 mm and the mean thickness was 1.23 ± 1.32 mm. Myocardial bridge fibres pass over the descending blood vessel at the angle of 10-90 degrees. The results obtained on a limited sample suggest that the muscular index of myocardial bridge is the highest for bridges located on RIA, but that the difference is not significant in relation to bridges located on other branches. The results obtained suggest that bridges located on other branches, not only those on RIA, could have a great contractive power and, consequently, a great compressive force, which would be exerted on the wall of a crossed blood vessel.

  3. Field performance of timber bridges. 17, Ciphers stress-laminated deck bridge

    Treesearch

    James P. Wacker; James A. Kainz; Michael A. Ritter

    In September 1989, the Ciphers bridge was constructed within the Beltrami Island State Forest in Roseau County, Minnesota. The bridge superstructure is a two-span continuous stress-laminated deck that is approximately 12.19 m long, 5.49 m wide, and 305 mm deep (40 ft long, 18 ft wide, and 12 in. deep). The bridge is one of the first to utilize red pine sawn lumber for...

  4. 6. VIEW OF GDOT BRIDGE NO. 02700268X00678N BRIDGE PLATE IDENTIFYING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. VIEW OF GDOT BRIDGE NO. 027-00268X-00678N BRIDGE PLATE IDENTIFYING COUNTY COMMISSIONERS AT THE TIME OF CONSTRUCTION. - GDOT Bridge No. 027-00268X-00678N, County Road 268-Empress Road span Piscola Creek, Quitman, Brooks County, GA

  5. SSI-bridge : soil bridge interaction during long-duration earthquake motions.

    DOT National Transportation Integrated Search

    2014-09-01

    The seismic response of a complete soil-bridge system during shallow, crustal and subduction zone earthquakes is the topic of this report. Specifically, the effects of earthquake duration on the seismic performance of soil-bridge systems are examined...

  6. 49 CFR 236.312 - Movable bridge, interlocking of signal appliances with bridge devices.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Movable bridge, interlocking of signal appliances with bridge devices. 236.312 Section 236.312 Transportation Other Regulations Relating to... SYSTEMS, DEVICES, AND APPLIANCES Interlocking Standards § 236.312 Movable bridge, interlocking of signal...

  7. 49 CFR 236.312 - Movable bridge, interlocking of signal appliances with bridge devices.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Movable bridge, interlocking of signal appliances with bridge devices. 236.312 Section 236.312 Transportation Other Regulations Relating to... SYSTEMS, DEVICES, AND APPLIANCES Interlocking Standards § 236.312 Movable bridge, interlocking of signal...

  8. 76 FR 55160 - Annual Materials Report on New Bridge Construction and Bridge Rehabilitation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-06

    ... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Annual Materials Report on New Bridge Construction and Bridge Rehabilitation AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice... for Users (SAFETEA-LU) (Pub. L. 109-59; 119 Stat. 1144) continued the highway bridge program to enable...

  9. 77 FR 53251 - Annual Materials Report on New Bridge Construction and Bridge Rehabilitation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-31

    ... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Annual Materials Report on New Bridge Construction and Bridge Rehabilitation AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice... for Users (SAFETEA-LU) (Pub. L. 109-59; 119 Stat. 1144) continued the highway bridge program to enable...

  10. 75 FR 62181 - Annual Materials Report on New Bridge Construction and Bridge Rehabilitation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-07

    ... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Annual Materials Report on New Bridge Construction and Bridge Rehabilitation AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice... for Users (SAFETEA-LU) (Pub. L. 109-59; 119 Stat. 1144) continued the highway bridge program to enable...

  11. Evaluation of bridge replacement alternatives for the county bridge system.

    DOT National Transportation Integrated Search

    1994-08-01

    Recent reports have indicated that 23.5 percent of the nation's highway bridges are : structurally deficient and 17.7 percent are functionally obsolete. A significant number of these bridges : are on the Iowa county road system. The objective of the ...

  12. Field performance of timber bridges. 16, North Siwell Road stress-laminated bridge

    Treesearch

    J. A. Kainz

    The North Siwell Road bridge was constructed during December 1994 in Hinds County, Mississippi. The bridge is a single-span, stress-laminated T-beam structure that measures 9.1 m (30 ft) long and 8.7 m (28.5 ft) wide. Performance of the bridge was monitored for 24 months, beginning at the time of installation. Monitoring involved gathering and evaluating data relative...

  13. Field performance of timber bridges. 10, Sanborn Brook stress-laminated deck bridge

    Treesearch

    P. D. Hilbrich Lee; J. P. Wacker; M. A. Ritter

    The Sanborn Brook bridge was constructed in August 1991, 10 miles northeast of Concord, New Hampshire, as part of the demonstration timber bridge program of the USDA Forest Service. The bridge is a simple-span, double-lane, stress-laminated deck superstructure constructed from Southern Pine lumber and is approximately 25 ft long and 28 ft wide with a skew of 14 degrees...

  14. Validation of correction factors for concrete coefficient of thermal expansion.

    DOT National Transportation Integrated Search

    2010-07-01

    To complete the objectives, AASHTO T 366-09 results will be compared to ASHTO TP 60-00 results. The results will then be used as input values for the MEPDG and the results evaluated. : Major changes between AASHTO TP 60-00 and AASHTO T 336-09 will be...

  15. Performance evaluation of bridges with structural bridge deck overlays (SBDO).

    DOT National Transportation Integrated Search

    2006-03-01

    Structural Bridge Deck Overlay (SBDO) involves applying 6 to 10 inches (150 to 200 mm) of normal weight, class AA, reinforced concrete directly to a bridges original slab. The overlay is designed to increase the deck elevation to an extent that st...

  16. Long continuous bridge deck evaluation : John Day River Bridge, Clatsop County, Bridge No. 1827B : final report.

    DOT National Transportation Integrated Search

    1995-06-01

    The John Day River Bridge, near Astoria, Oregon was built with a continuous deck length of 1,105 ft. (340 m). The rationale for designing the John Day River Bridge with an unusually long continuous deck is in part based on the site's very mild climat...

  17. Reconfigurable wireless monitoring systems for bridges: validation on the Yeondae Bridge

    NASA Astrophysics Data System (ADS)

    Kim, Junhee; Lynch, Jerome P.; Zonta, Daniele; Lee, Jong-Jae; Yun, Chung-Bang

    2009-03-01

    The installation of a structural monitoring system on a medium- to large-span bridge can be a challenging undertaking due to high system costs and time consuming installations. However, these historical challenges can be eliminated by using wireless sensors as the primary building block of a structural monitoring system. Wireless sensors are low-cost data acquisition nodes that utilize wireless communication to transfer data from the sensor to the data repository. Another advantageous characteristic of wireless sensors is their ability to be easily removed and reinstalled in another sensor location on the same structure; this installation modularity is highlighted in this study. Wireless sensor nodes designed for structural monitoring applications are installed on the 180 m long Yeondae Bridge (Korea) to measure the dynamic response of the bridge to controlled truck loading. To attain a high nodal density with a small number (20) of wireless sensors, the wireless sensor network is installed three times with each installation concentrating sensors in one portion of the bridge. Using forced and free vibration response data from the three installations, the modal properties of the bridge are accurately identified. Intentional nodal overlapping of the three different sensor installations allows mode shapes from each installation to be stitched together into global mode shapes. Specifically, modal properties of the Yeondae Bridge are derived off-line using frequency domain decomposition (FDD) modal analysis methods.

  18. 33 CFR 115.40 - Bridge repairs.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Bridge repairs. 115.40 Section 115.40 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.40 Bridge repairs. Repairs to a bridge which do...

  19. 33 CFR 115.40 - Bridge repairs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Bridge repairs. 115.40 Section 115.40 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.40 Bridge repairs. Repairs to a bridge which do...

  20. Building Better Bridges into STEM: A Synthesis of 25 Years of Literature on STEM Summer Bridge Programs

    PubMed Central

    Ashley, Michael; Cooper, Katelyn M.; Cala, Jacqueline M.; Brownell, Sara E.

    2017-01-01

    Summer bridge programs are designed to help transition students into the college learning environment. Increasingly, bridge programs are being developed in science, technology, engineering, and mathematics (STEM) disciplines because of the rigorous content and lower student persistence in college STEM compared with other disciplines. However, to our knowledge, a comprehensive review of STEM summer bridge programs does not exist. To provide a resource for bridge program developers, we conducted a systematic review of the literature on STEM summer bridge programs. We identified 46 published reports on 30 unique STEM bridge programs that have been published over the past 25 years. In this review, we report the goals of each bridge program and whether the program was successful in meeting these goals. We identify 14 distinct bridge program goals that can be organized into three categories: academic success goals, psychosocial goals, and department-level goals. Building on the findings of published bridge reports, we present a set of recommendations for STEM bridge programs in hopes of developing better bridges into college. PMID:29146667

  1. Wright-Fisher diffusion bridges.

    PubMed

    Griffiths, Robert C; Jenkins, Paul A; Spanò, Dario

    2017-10-06

    The trajectory of the frequency of an allele which begins at x at time 0 and is known to have frequency z at time T can be modelled by the bridge process of the Wright-Fisher diffusion. Bridges when x=z=0 are particularly interesting because they model the trajectory of the frequency of an allele which appears at a time, then is lost by random drift or mutation after a time T. The coalescent genealogy back in time of a population in a neutral Wright-Fisher diffusion process is well understood. In this paper we obtain a new interpretation of the coalescent genealogy of the population in a bridge from a time t∈(0,T). In a bridge with allele frequencies of 0 at times 0 and T the coalescence structure is that the population coalesces in two directions from t to 0 and t to T such that there is just one lineage of the allele under consideration at times 0 and T. The genealogy in Wright-Fisher diffusion bridges with selection is more complex than in the neutral model, but still with the property of the population branching and coalescing in two directions from time t∈(0,T). The density of the frequency of an allele at time t is expressed in a way that shows coalescence in the two directions. A new algorithm for exact simulation of a neutral Wright-Fisher bridge is derived. This follows from knowing the density of the frequency in a bridge and exact simulation from the Wright-Fisher diffusion. The genealogy of the neutral Wright-Fisher bridge is also modelled by branching Pólya urns, extending a representation in a Wright-Fisher diffusion. This is a new very interesting representation that relates Wright-Fisher bridges to classical urn models in a Bayesian setting. Copyright © 2017 Elsevier Inc. All rights reserved.

  2. Extracorporeal Life Support Bridge to Ventricular Assist Device: The Double Bridge Strategy.

    PubMed

    Marasco, Silvana F; Lo, Casey; Murphy, Deirdre; Summerhayes, Robyn; Quayle, Margaret; Zimmet, Adam; Bailey, Michael

    2016-01-01

    In patients requiring left ventricular assist device (LVAD) support, it can be difficult to ascertain suitability for long-term mechanical support with LVAD and eventual transplantation. LVAD implantation in a shocked patient is associated with increased morbidity and mortality. Interest is growing in the utilization of extracorporeal life support (ECLS) as a bridge-to-bridge support for these critically unwell patients. Here, we reviewed our experience with ECLS double bridging. We hypothesized that ECLS double bridging would stabilize end-organ dysfunction and reduce ventricular assist device (VAD) implant perioperative mortality. We conducted a retrospective review of prospectively collected data for 58 consecutive patients implanted with a continuous-flow LVAD between January 2010 and December 2013 at The Alfred Hospital, Melbourne, Victoria, Australia. Twenty-three patients required ECLS support pre-LVAD while 35 patients underwent LVAD implantation without an ECLS bridge. Preoperative morbidity in the ECLS bridge group was reflected by increased postoperative intensive care duration, blood loss, blood product use, and postoperative renal failure, but without negative impact upon survival when compared with the no ECLS group. ECLS stabilization improved end-organ function pre-VAD implant with significant improvements in hepatic and renal dysfunction. This series demonstrates that the use of ECLS bridge to VAD stabilizes end-organ dysfunction and reduces VAD implant perioperative mortality from that traditionally reported in these "crash and burn" patients. Copyright © 2015 International Center for Artificial Organs and Transplantation and Wiley Periodicals, Inc.

  3. Advanced bridge safety initiative : FRP flexural retrofit for concrete slab bridges - task 4 deliverables.

    DOT National Transportation Integrated Search

    2014-06-01

    Concrete slab bridges are being examined as part of the MaineDOT Advanced Bridge Safety Initiative. Under Tasks : 1 3 a finite element analysis program is developed, validated and applied to twenty bridges. : Task 4 investigates and develops a no...

  4. Semiconductor bridge (SCB) detonator

    DOEpatents

    Bickes, Jr., Robert W.; Grubelich, Mark C.

    1999-01-01

    The present invention is a low-energy detonator for high-density secondary-explosive materials initiated by a semiconductor bridge igniter that comprises a pair of electrically conductive lands connected by a semiconductor bridge. The semiconductor bridge is in operational or direct contact with the explosive material, whereby current flowing through the semiconductor bridge causes initiation of the explosive material. Header wires connected to the electrically-conductive lands and electrical feed-throughs of the header posts of explosive devices, are substantially coaxial to the direction of current flow through the SCB, i.e., substantially coaxial to the SCB length.

  5. Semiconductor bridge (SCB) detonator

    DOEpatents

    Bickes, R.W. Jr.; Grubelich, M.C.

    1999-01-19

    The present invention is a low-energy detonator for high-density secondary-explosive materials initiated by a semiconductor bridge (SCB) igniter that comprises a pair of electrically conductive lands connected by a semiconductor bridge. The semiconductor bridge is in operational or direct contact with the explosive material, whereby current flowing through the semiconductor bridge causes initiation of the explosive material. Header wires connected to the electrically-conductive lands and electrical feed-throughs of the header posts of explosive devices, are substantially coaxial to the direction of current flow through the SCB, i.e., substantially coaxial to the SCB length. 3 figs.

  6. Bridge maintenance to enhance corrosion resistance and performance of steel girder bridges

    NASA Astrophysics Data System (ADS)

    Moran Yanez, Luis M.

    The integrity and efficiency of any national highway system relies on the condition of the various components. Bridges are fundamental elements of a highway system, representing an important investment and a strategic link that facilitates the transport of persons and goods. The cost to rehabilitate or replace a highway bridge represents an important expenditure to the owner, who needs to evaluate the correct time to assume that cost. Among the several factors that affect the condition of steel highway bridges, corrosion is identified as the main problem. In the USA corrosion is the primary cause of structurally deficient steel bridges. The benefit of regular high-pressure superstructure washing and spot painting were evaluated as effective maintenance activities to reduce the corrosion process. The effectiveness of steel girder washing was assessed by developing models of corrosion deterioration of composite steel girders and analyzing steel coupons at the laboratory under atmospheric corrosion for two alternatives: when high-pressure washing was performed and when washing was not considered. The effectiveness of spot painting was assessed by analyzing the corrosion on steel coupons, with small damages, unprotected and protected by spot painting. A parametric analysis of corroded steel girder bridges was considered. The emphasis was focused on the parametric analyses of corroded steel girder bridges under two alternatives: (a) when steel bridge girder washing is performed according to a particular frequency, and (b) when no bridge washing is performed to the girders. The reduction of structural capacity was observed for both alternatives along the structure service life, estimated at 100 years. An economic analysis, using the Life-Cycle Cost Analysis method, demonstrated that it is more cost-effective to perform steel girder washing as a scheduled maintenance activity in contrast to the no washing alternative.

  7. Calibration of Resistance Factors Needed in the LRFD Design of Driven Piles : LTRC technical summary report 449.

    DOT National Transportation Integrated Search

    2009-05-01

    The allowable stress design (ASD) method had been used for many years in the design of bridges, which involves : applying a factor of safety (FS) to account for uncertainties in applied loads and soil resistance. The magnitude of : FS depends on the ...

  8. Bridge Workshop : Enhancing Bridge Performance, February 21-22, 2008, Reston, Virginia : workshop report

    Treesearch

    Sreenivas Alampalli; Sheila Rimal Duwadi; Reagan Sentelle Herman; Danielle D. Kleinhans; Khaled Mahmoud; James C. Ray; James P. Wacker; Nur Yazdani

    2008-01-01

    The participants to the workshop were given the charge to discuss (1) bridge design issues including best practices in design and detailing that could be used to improve durability, extend service life and prevent premature deterioration, (2) performance measures needed to better determine bridge condition, (3) technologies that could be used to monitor bridge life and...

  9. Field performance of timber bridges. 15, Pueblo County, Colorado, stress-laminated deck bridge

    Treesearch

    L. E. Hislop

    The Pueblo County 204B bridge was constructed in March 1990 in Pueblo, Colorado, as a demonstration bridge under the USDA Forest Service Timber Bridge Initiative. The stress-laminated deck superstructure is approximately 10 m long, 9 m wide, and 406 mm deep, with a skew of 10 degrees. Performance monitoring was conducted for 3 years, beginning at...

  10. Seismic testing of precast segmental bridges, Phase III : bridge system test.

    DOT National Transportation Integrated Search

    2005-06-01

    This report discusses the main findings of a test examining the seismic behavior of a precast, post-tensioned, segmental bridge : superstructure with a cast-in-place, hollow, rectangular column. The half-scale specimen modeled a prototype bridge from...

  11. Bridge deck deicing

    DOT National Transportation Integrated Search

    1998-01-01

    Concrete bridge decks are prone to ice accumulation. The use of road salts and chemicals for deicing is cost effective but causes damage to concrete and corrosion of reinforcing steel in concrete bridge decks. This problem is a major concern to trans...

  12. Removal of failed crown and bridge

    PubMed Central

    Rahul, G R.; Poduval, Soorya T.; Shetty, Karunakar

    2012-01-01

    Crown and bridge have life span of many years but they fail for a number of reasons. Over the years, many devices have been designed to remove crowns and bridges from abutment teeth. While the removal of temporary crowns and bridges is usually very straightforward, the removal of a definitive cast crown with unknown cement is more challenging. Removal is often by destructive means. There are a number of circumstances, however, in which conservative disassembly would aid the practitioner in completing restorative/endodontic procedures. There are different mechanisms available to remove a failed crown or bridge. But there is no information published about the classification of available systems for crown and bridge removal. So it is logical to classify these systems into different groups which can help a clinician in choosing a particular type of system depending upon the clinical situation. The aim of this article is to provide a classification for various crown and bridge removal systems; describe how a number of systems work; and when and why they might be used. A PubMed search of English literature was conducted up to January 2010 using the terms: Crown and bridge removal, Crown and bridge disassembly, Crown and bridge failure. Additionally, the bibliographies of 3 previous reviews, their cross references as well as articles published in various journals like International Endodontic Journal, Journal of Endodontics and were manually searched. Key words:Crown and bridge removal, Crown and bridge disassembly, Crown and bridge failure. PMID:24558549

  13. 49 CFR 237.109 - Bridge inspection records.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Bridge inspection records. 237.109 Section 237.109..., DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.109 Bridge inspection records... performed on those bridges under this part. (b) Each record of an inspection under the bridge management...

  14. 49 CFR 237.109 - Bridge inspection records.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Bridge inspection records. 237.109 Section 237.109..., DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.109 Bridge inspection records... performed on those bridges under this part. (b) Each record of an inspection under the bridge management...

  15. Load rating of complex bridges.

    DOT National Transportation Integrated Search

    2010-07-01

    The National Bridge Inspection Standards require highway departments to inspect, evaluate, and determine load ratings for : structures defined as bridges located on all public roads. Load rating of bridges is performed to determine the live load that...

  16. Field performance of timber bridges. 8, Lynches Woods Park stress-laminated deck bridge

    Treesearch

    J. P. Wacker; M. A. Ritter; D. Conger

    The Lynches Woods Park bridge was constructed during the summer of 1990 in Newberry, South Carolina. It is a single-span, single-lane, stress-laminated deck superstructure that measures approximately 30 ft long, 16 ft wide, and 14 in. deep. The bridge is unique in that is one of the first known stress-laminated deck bridges to be constructed of Southern Pine lumber...

  17. Salt-Bridge Energetics in Halophilic Proteins

    PubMed Central

    Nayek, Arnab; Sen Gupta, Parth Sarthi; Banerjee, Shyamashree; Mondal, Buddhadev; Bandyopadhyay, Amal K.

    2014-01-01

    Halophilic proteins have greater abundance of acidic over basic and very low bulky hydrophobic residues. Classical electrostatic stabilization was suggested as the key determinant for halophilic adaptation of protein. However, contribution of specific electrostatic interactions (i.e. salt-bridges) to overall stability of halophilic proteins is yet to be understood. To understand this, we use Adaptive-Poison-Boltzmann-Solver Methods along with our home-built automation to workout net as well as associated component energy terms such as desolvation energy, bridge energy and background energy for 275 salt-bridges from 20 extremely halophilic proteins. We then perform extensive statistical analysis on general and energetic attributes on these salt-bridges. On average, 8 salt-bridges per 150 residues protein were observed which is almost twice than earlier report. Overall contributions of salt-bridges are −3.0 kcal mol−1. Majority (78%) of salt-bridges in our dataset are stable and conserved in nature. Although, average contributions of component energy terms are equal, their individual details vary greatly from one another indicating their sensitivity to local micro-environment. Notably, 35% of salt-bridges in our database are buried and stable. Greater desolvation penalty of these buried salt-bridges are counteracted by stable network salt-bridges apart from favorable equal contributions of bridge and background terms. Recruitment of extensive network salt-bridges (46%) with a net contribution of −5.0 kcal mol−1 per salt-bridge, seems to be a halophilic design wherein favorable average contribution of background term (−10 kcal mol−1) exceeds than that of bridge term (−7 kcal mol−1). Interiors of proteins from halophiles are seen to possess relatively higher abundance of charge and polar side chains than that of mesophiles which seems to be satisfied by cooperative network salt-bridges. Overall, our theoretical analyses provide insight into halophilic

  18. Salt-bridge energetics in halophilic proteins.

    PubMed

    Nayek, Arnab; Sen Gupta, Parth Sarthi; Banerjee, Shyamashree; Mondal, Buddhadev; Bandyopadhyay, Amal K

    2014-01-01

    Halophilic proteins have greater abundance of acidic over basic and very low bulky hydrophobic residues. Classical electrostatic stabilization was suggested as the key determinant for halophilic adaptation of protein. However, contribution of specific electrostatic interactions (i.e. salt-bridges) to overall stability of halophilic proteins is yet to be understood. To understand this, we use Adaptive-Poison-Boltzmann-Solver Methods along with our home-built automation to workout net as well as associated component energy terms such as desolvation energy, bridge energy and background energy for 275 salt-bridges from 20 extremely halophilic proteins. We then perform extensive statistical analysis on general and energetic attributes on these salt-bridges. On average, 8 salt-bridges per 150 residues protein were observed which is almost twice than earlier report. Overall contributions of salt-bridges are -3.0 kcal mol-1. Majority (78%) of salt-bridges in our dataset are stable and conserved in nature. Although, average contributions of component energy terms are equal, their individual details vary greatly from one another indicating their sensitivity to local micro-environment. Notably, 35% of salt-bridges in our database are buried and stable. Greater desolvation penalty of these buried salt-bridges are counteracted by stable network salt-bridges apart from favorable equal contributions of bridge and background terms. Recruitment of extensive network salt-bridges (46%) with a net contribution of -5.0 kcal mol-1 per salt-bridge, seems to be a halophilic design wherein favorable average contribution of background term (-10 kcal mol-1) exceeds than that of bridge term (-7 kcal mol-1). Interiors of proteins from halophiles are seen to possess relatively higher abundance of charge and polar side chains than that of mesophiles which seems to be satisfied by cooperative network salt-bridges. Overall, our theoretical analyses provide insight into halophilic signature in its

  19. Field performance of timber bridges. 12, Christian Hollow stress-laminated box-beam bridge

    Treesearch

    J. P. Wacker; S. C. Catherman; R. G. Winnett

    In January 1992, the Christian Hollow bridge was constructed in Steuben County, New York. The bridge is a single-span, stress-laminated box-beam superstructure that is 9.1 m long, 9.8 m wide, and 502 mm deep (30 ft long, 32 ft wide, and 19-3/4 in. deep). The performance of the bridge was continuously monitored for 28 months, beginning shortly after installation....

  20. Field performance of timber bridges. 14, Dean, Hibbsville, and Decatur stress-laminated deck bridges

    Treesearch

    P. D. Hilbrich Lee; M. A. Ritter; S. Golston; K. Hinds

    1984-01-01

    The Dean, Hibbsville, and Decatur bridges were constructed in southern Iowa during 1994. Each bridge is a simple-span, stress-laminated deck superstructure, approximately 7.3 m (24 ft) long, constructed from eastern cottonwood lumber. The performance of each bridge was monitored for approximately 2 years, beginning shortly after installation. Monitoring involved...

  1. Precast concrete elements for accelerated bridge construction : laboratory testing, field testing, evaluation of a precast concrete bridge, Madison County bridge.

    DOT National Transportation Integrated Search

    2009-01-01

    The importance of rapid construction technologies has been recognized by the Federal Highway Administration (FHWA) and the Iowa : DOT Office of Bridges and Structures. Recognizing this a two-lane single-span precast box girder bridge was constructed ...

  2. Two test level 4 bridge railing and transition systems for transverse timber deck bridges

    Treesearch

    Ronald K. Faller; Michael A. Ritter; Barry T. Rosson; Michael D. Fowler; Sheila R. Duwadi

    2000-01-01

    The Midwest Roadside Safety Facility, in cooperation with the Forest Products Laboratory, which is part of the U.S. Department of Agricultureas Forest Service, and FHWA, designed two bridge railing and approach guardrail transition systems for use on bridges with transverse glue-laminated timber decks. The bridge raging and transition systems were developed and crash...

  3. Geotextile reinforced bridge approach embankment : Lake River Bridge : Malin Highway , Klamath County, Oregon : construction report.

    DOT National Transportation Integrated Search

    1993-03-01

    The transition from the roadway to the deck of a rigidly supported bridge is of concern to engineers and the travelling public. It is a common occurrence to feel a discontinuity between the roadway and bridge structure. Bridge engineers have tried to...

  4. 49 CFR 237.103 - Bridge inspection procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Bridge inspection procedures. 237.103 Section 237... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.103 Bridge inspection procedures. (a) Each bridge management program shall specify the procedure to be used for...

  5. Temperature differential of swingspan bridges : final report.

    DOT National Transportation Integrated Search

    1969-06-01

    This report describes a study performed to determine the temperature differential of the top and bottom member of one side of a swingspan bridge. Three bridges were used in the study. Bridge No. 1 was an equal-arm swingspan bridge, Bridge No. 2 was a...

  6. 49 CFR 237.103 - Bridge inspection procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Bridge inspection procedures. 237.103 Section 237... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.103 Bridge inspection procedures. (a) Each bridge management program shall specify the procedure to be used for...

  7. Building Better Bridges into STEM: A Synthesis of 25 Years of Literature on STEM Summer Bridge Programs.

    PubMed

    Ashley, Michael; Cooper, Katelyn M; Cala, Jacqueline M; Brownell, Sara E

    2017-01-01

    Summer bridge programs are designed to help transition students into the college learning environment. Increasingly, bridge programs are being developed in science, technology, engineering, and mathematics (STEM) disciplines because of the rigorous content and lower student persistence in college STEM compared with other disciplines. However, to our knowledge, a comprehensive review of STEM summer bridge programs does not exist. To provide a resource for bridge program developers, we conducted a systematic review of the literature on STEM summer bridge programs. We identified 46 published reports on 30 unique STEM bridge programs that have been published over the past 25 years. In this review, we report the goals of each bridge program and whether the program was successful in meeting these goals. We identify 14 distinct bridge program goals that can be organized into three categories: academic success goals, psychosocial goals, and department-level goals. Building on the findings of published bridge reports, we present a set of recommendations for STEM bridge programs in hopes of developing better bridges into college. © 2017 M. Ashley, K. M. Cooper, et al. CBE—Life Sciences Education © 2017 The American Society for Cell Biology. This article is distributed by The American Society for Cell Biology under license from the author(s). It is available to the public under an Attribution–Noncommercial–Share Alike 3.0 Unported Creative Commons License (http://creativecommons.org/licenses/by-nc-sa/3.0).

  8. 23 CFR 650.307 - Bridge inspection organization.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Bridge inspection organization. 650.307 Section 650.307... BRIDGES, STRUCTURES, AND HYDRAULICS National Bridge Inspection Standards § 650.307 Bridge inspection... bridges located on public roads that are fully or partially located within the State's boundaries, except...

  9. 23 CFR 650.809 - Movable span bridges.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Movable span bridges. 650.809 Section 650.809 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Navigational Clearances for Bridges § 650.809 Movable span bridges. A fixed bridge...

  10. 23 CFR 650.809 - Movable span bridges.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Movable span bridges. 650.809 Section 650.809 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Navigational Clearances for Bridges § 650.809 Movable span bridges. A fixed bridge...

  11. Coupling vibration research on Vehicle-bridge system

    NASA Astrophysics Data System (ADS)

    Zhou, Jiguo; Wang, Guihua

    2018-01-01

    The vehicle-bridge coupling system forms when vehicle running on a bridge. It will generate a relatively large influence on the driving comfort and driving safe when the vibration of the vehicle is bigger. A three-dimensional vehicle-bridge system with biaxial seven degrees of freedom has been establish in this paper based on finite numerical simulation. Adopting the finite element transient numerical simulation to realize the numerical simulation of vehicle-bridge system coupling vibration. Then, analyze the dynamic response of vehicle and bridge while different numbers of vehicles running on the bridge. Got the variation rule of vertical vibration of car body and bridge, and that of the contact force between the wheel and bridge deck. The research results have a reference value for the analysis about the vehicle running on a large-span cabled bridge.

  12. Salt bridges: geometrically specific, designable interactions.

    PubMed

    Donald, Jason E; Kulp, Daniel W; DeGrado, William F

    2011-03-01

    Salt bridges occur frequently in proteins, providing conformational specificity and contributing to molecular recognition and catalysis. We present a comprehensive analysis of these interactions in protein structures by surveying a large database of protein structures. Salt bridges between Asp or Glu and His, Arg, or Lys display extremely well-defined geometric preferences. Several previously observed preferences are confirmed, and others that were previously unrecognized are discovered. Salt bridges are explored for their preferences for different separations in sequence and in space, geometric preferences within proteins and at protein-protein interfaces, co-operativity in networked salt bridges, inclusion within metal-binding sites, preference for acidic electrons, apparent conformational side chain entropy reduction on formation, and degree of burial. Salt bridges occur far more frequently between residues at close than distant sequence separations, but, at close distances, there remain strong preferences for salt bridges at specific separations. Specific types of complex salt bridges, involving three or more members, are also discovered. As we observe a strong relationship between the propensity to form a salt bridge and the placement of salt-bridging residues in protein sequences, we discuss the role that salt bridges might play in kinetically influencing protein folding and thermodynamically stabilizing the native conformation. We also develop a quantitative method to select appropriate crystal structure resolution and B-factor cutoffs. Detailed knowledge of these geometric and sequence dependences should aid de novo design and prediction algorithms. Copyright © 2010 Wiley-Liss, Inc.

  13. Active-bridge oscillator

    DOEpatents

    Wessendorf, Kurt O.

    2001-01-01

    An active bridge oscillator is formed from a differential amplifier where positive feedback is a function of the impedance of one of the gain elements and a relatively low value common emitter resistance. This use of the nonlinear transistor parameter h stabilizes the output and eliminates the need for ALC circuits common to other bridge oscillators.

  14. Bridging a cultural gap

    NASA Astrophysics Data System (ADS)

    Leviatan, Talma

    2008-09-01

    There has been a broad wave of change in tertiary calculus courses in the past decade. However, the much-needed change in tertiary pre-calculus programmes—aimed at bridging the gap between high-school mathematics and tertiary mathematics—is happening at a far slower pace. Following a discussion on the nature of the gap and the objectives of a potential bridging programme, this paper aims at demonstrating that the gap can be bridged, by presenting an ongoing modular bridging programme especially designed for the diverse types of student populations in teachers training colleges. We also present here some innovative teaching and assessment methods that were judged essential for the success of these programmes—focusing mainly on the "Questionnaire Based Instruction Method". Finally we suggest directions of follow up and research.

  15. Movable bridge maintenance monitoring.

    DOT National Transportation Integrated Search

    2013-10-01

    Movable bridges have particular maintenance issues, which cost considerably more than those of fixed bridges, : mostly because of the complex interaction of the mechanical, electrical and structural components. In order to track : maintenance and ope...

  16. Characterization of stormwater runoff from bridges in North Carolina and the effects of bridge runoff on receiving streams

    USGS Publications Warehouse

    Wagner, Chad; Fitzgerald, Sharon; Lauffer, Matthew

    2015-01-01

    The presentation will provide an overview of a collaborative study between USGS, NC Department of Transportation and URS Corporation to characterize stormwater runoff from bridges in North Carolina and the effects of bridge runoff on receiving streams. This investigation measured bridge deck runoff from 15 bridges for 12-15 storms, stream water-quality data for baseflow and storm conditions at four of the bridge deck sites and streambed sediment chemistry upstream and downstream of 30 bridges across North Carolina. Background on why the study was conducted, objectives and scope and a general summary of the major results and conclusions will be presented.

  17. Bridge element deterioration rates.

    DOT National Transportation Integrated Search

    2008-10-01

    This report describes the development of bridge element deterioration rates using the NYSDOT : bridge inspection database using Markov chains and Weibull-based approaches. It is observed : that Weibull-based approach is more reliable for developing b...

  18. Bridge deck wearing surfaces.

    DOT National Transportation Integrated Search

    2010-11-01

    Several commercially available bridge deck overlay systems claim to be waterproof and reduce deterioration caused by chloride laden water from penetrating concrete bridge decks. An attempt was made to quantify the in-service waterproofing qualities o...

  19. Bridge-Vehicle Impact Assessment

    DOT National Transportation Integrated Search

    2011-08-01

    Bridges in New York State have been experiencing close to 200 bridge hits a year. These : accidents are attributed to numerous factors including: improperly stored equipment on trucks; : violation of vehicle posting signs; illegal commercial vehicles...

  20. Bridge vehicle impact assessment.

    DOT National Transportation Integrated Search

    2011-12-01

    Bridges in New York State have been experiencing close to 200 bridge hits a year. These : accidents are attributed to numerous factors including: improperly stored equipment on trucks; : violation of vehicle posting signs; illegal commercial vehicles...

  1. Akashi-Kaikyo Bridge, Japan

    NASA Image and Video Library

    2015-08-10

    The Akashi Kaikyo Bridge in Japan has the longest central span of any suspension bridge in the world at 1991 m. The total length of the bridge is 3911 m. It links the city of Kobe on the mainland of Honshu to Iwaya on Awaji Island, crossing the busy Akashi Strait. The image was acquired April 26, 2014, covers an area of 8.1 by 11.2 km, and is located at 34.6 degrees north, 135 degrees east. http://photojournal.jpl.nasa.gov/catalog/PIA19747

  2. BUILDING A BETTER GLUTEAL BRIDGE: ELECTROMYOGRAPHIC ANALYSIS OF HIP MUSCLE ACTIVITY DURING MODIFIED SINGLE-LEG BRIDGES.

    PubMed

    Lehecka, B J; Edwards, Michael; Haverkamp, Ryan; Martin, Lani; Porter, Kambry; Thach, Kailey; Sack, Richard J; Hakansson, Nils A

    2017-08-01

    Gluteal strength plays a role in injury prevention, normal gait patterns, eliminating pain, and enhancing athletic performance. Research shows high gluteal muscle activity during a single-leg bridge compared to other gluteal strengthening exercises; however, prior studies have primarily measured muscle activity with the active lower extremity starting in 90 ° of knee flexion with an extended contralateral knee. This standard position has caused reports of hamstring cramping, which may impede optimal gluteal strengthening. The purpose of this study was to determine which modified position for the single-leg bridge is best for preferentially activating the gluteus maximus and medius. Cross-Sectional. Twenty-eight healthy males and females aged 18-30 years were tested in five different, randomized single-leg bridge positions. Electromyography (EMG) electrodes were placed on subjects' gluteus maximus, gluteus medius, rectus femoris, and biceps femoris of their bridge leg (i.e., dominant or kicking leg), as well as the rectus femoris of their contralateral leg. Subjects performed a maximal voluntary isometric contraction (MVIC) for each tested muscle prior to performing five different bridge positions in randomized order. All bridge EMG data were normalized to the corresponding muscle MVIC data. A modified bridge position with the knee of the bridge leg flexed to 135 ° versus the traditional 90 ° of knee flexion demonstrated preferential activation of the gluteus maximus and gluteus medius compared to the traditional single-leg bridge. Hamstring activation significantly decreased (p < 0.05) when the dominant knee was flexed to 135 ° (23.49% MVIC) versus the traditional 90 ° (75.34% MVIC), while gluteal activation remained similarly high (51.01% and 57.81% MVIC in the traditional position, versus 47.35% and 57.23% MVIC in the modified position for the gluteus maximus and medius, respectively). Modifying the traditional single-leg bridge by flexing the

  3. 23 CFR 650.409 - Evaluation of bridge inventory.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Evaluation of bridge inventory. 650.409 Section 650.409... BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.409 Evaluation of bridge inventory. (a) Sufficiency rating of bridges. Upon receipt and evaluation of the bridge...

  4. 23 CFR 650.409 - Evaluation of bridge inventory.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Evaluation of bridge inventory. 650.409 Section 650.409... BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.409 Evaluation of bridge inventory. (a) Sufficiency rating of bridges. Upon receipt and evaluation of the bridge...

  5. Developing deterioration models for Nebraska bridges.

    DOT National Transportation Integrated Search

    2011-07-01

    Nebraska Bridge Management System (NBMS) was developed in 1999 to assist in optimizing budget allocation for : the maintenance, rehabilitation and replacement needs of highway bridges. This requires the prediction of bridge : deterioration to calcula...

  6. Movable bridge maintenance monitoring : [technical summary].

    DOT National Transportation Integrated Search

    2013-10-01

    Maintenance costs for movable bridges are considerably higher than for fixed bridges, mostly because of the complex interaction of mechanical, electrical, and structural components. Malfunction of any component can cause unexpected failure of bridge ...

  7. LTBP bridge performance primer.

    DOT National Transportation Integrated Search

    2013-12-01

    "The performance of bridges is critical to the overall performance of the highway transportation system in the United States. However, many critical aspects of bridge performance are not well understood. The reasons for this include the extreme diver...

  8. Newport Pell Bridge traffic and revenue study

    DOT National Transportation Integrated Search

    2010-01-12

    Jacobs Engineering conducted a traffic and toll revenue study for the Claiborne Pell Newport Bridge : (Newport Pell Bridge or Pell Bridge) upon the request of the Rhode Island Turnpike and Bridge : Authority (RITBA). This study is being c...

  9. 33 CFR 115.70 - Advance approval of bridges.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Advance approval of bridges. 115... BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.70 Advance approval of bridges. (a) The General Bridge Act of 1946 requires the approval of the location and plans of bridges prior...

  10. 33 CFR 115.70 - Advance approval of bridges.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Advance approval of bridges. 115... BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.70 Advance approval of bridges. (a) The General Bridge Act of 1946 requires the approval of the location and plans of bridges prior...

  11. Temporary bridge deck panels.

    DOT National Transportation Integrated Search

    2009-03-01

    The research described here has resulted in the development of a simplistic and innovative interlocking : glulam bridge deck panel for use in temporary bridge deck applications. The key feature of this panel : system is the interlocking tongue and gr...

  12. Bridge Scour Technology Transfer

    DOT National Transportation Integrated Search

    2018-01-24

    Scour and flooding are the leading causes of bridge failures in the United States and therefore should be monitored. New applications of tools and technologies are being developed, tested, and implemented to reduce bridge scour risk. The National Coo...

  13. Chesapeake City Bridge. Bridge Inspection Report Number 11B.

    DTIC Science & Technology

    1979-12-01

    recommendations for th 1979 inspection of the Chesapeake City Bridge (Route designation , U.S. Route 213) which crosses the Chesappake and Delaware Canal...Los Arg4 .PASN4 . Mrkee. g14neaoos. Nevr,,r DE . Now York Oemnfto, overland PWn KS. Fh ~M% S0.mo- Tamp, TW=. F wia AMot ho d Jl 4O T, - kv Col. James G...1979 inspection of the Chesapeake City Bridge (Route designation , U.S. Route 213) which crosses the Chesapeake and Delaware Canal was undertaken for the

  14. Development of a sustainable UHPC bridge deck for movable bridges : [research project capsule].

    DOT National Transportation Integrated Search

    2015-11-01

    Louisiana has approximately 160 movable bridges, mostly in the southern part of the state, which : places Louisiana among states with the highest inventory of movable bridges in the nation. These : transportation arteries are important for the econom...

  15. 49 CFR 236.766 - Locking, movable bridge.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Locking, movable bridge. 236.766 Section 236.766... Locking, movable bridge. The rail locks, bridge locks, bolt locks, circuit controllers, and electric locks used in providing interlocking protection at a movable bridge. ...

  16. 49 CFR 236.766 - Locking, movable bridge.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Locking, movable bridge. 236.766 Section 236.766... Locking, movable bridge. The rail locks, bridge locks, bolt locks, circuit controllers, and electric locks used in providing interlocking protection at a movable bridge. ...

  17. Dynamic assessment of bridge deck performance considering realistic bridge-traffic interaction : research brief

    DOT National Transportation Integrated Search

    2017-09-01

    This study is to develop simulation methodology to conduct the dynamic assessment of bridge deck performance subjected to traffic. Concrete bridge decks are exposed to daily traffic loads and may experience some surface cracking caused by excessive s...

  18. Development of a precast bridge deck overhang system for the rock creek bridge.

    DOT National Transportation Integrated Search

    2008-12-01

    Precast, prestressed panels are commonly used at interior beams for bridges in Texas. The use of these : panels provides ease of construction, sufficient capacity, and good economy for the construction of : bridges in Texas. Current practice for the ...

  19. Evaluation of a highway bridge constructed using high strength lightweight concrete bridge girders.

    DOT National Transportation Integrated Search

    2011-04-01

    The purpose of this research was to characterize the performance of High Strength Lightweight Concrete (HSLW) in precast, prestressed bridge girders and to evaluate their performance in a highway bridge. The mechanical properties and long-term time-d...

  20. Bridging: Locating Critical Connectors in a Network

    PubMed Central

    Valente, Thomas W.; Fujimoto, Kayo

    2010-01-01

    This paper proposes several measures for bridging in networks derived from Granovetter's (1973) insight that links which reduce distances in a network are important structural bridges. Bridging is calculated by systematically deleting links and calculating the resultant changes in network cohesion (measured as the inverse average path length). The average change for each node's links provides an individual level measure of bridging. We also present a normalized version which controls for network size and a network level bridging index. Bridging properties are demonstrated on hypothetical networks, empirical networks, and a set of 100 randomly generated networks to show how the bridging measure correlates with existing network measures such as degree, personal network density, constraint, closeness centrality, betweenness centrality, and vitality. Bridging and the accompanying methodology provide a family of new network measures useful for studying network structure, network dynamics, and network effects on substantive behavioral phenomenon. PMID:20582157

  1. Field performance of timber bridges. 13, Mohawk Canal stress-laminated bridge

    Treesearch

    P. D. Hilbrich Lee; X. Lauderdale

    The Mohawk Canal bridge was constructed in August 1994, just outside Roll, Arizona. It is a simple-span, double-lane, stress-laminated deck superstructure, approximately 6.4 m (21 ft) long and 10.4 m (34 ft) wide and constructed with Combination 16F-V3 Douglas Fir glued-laminated timber beam laminations. The performance of the bridge was monitored continuously for 2...

  2. Development of inspection robots for bridge cables.

    PubMed

    Yun, Hae-Bum; Kim, Se-Hoon; Wu, Liuliu; Lee, Jong-Jae

    2013-01-01

    This paper presents the bridge cable inspection robot developed in Korea. Two types of the cable inspection robots were developed for cable-suspension bridges and cable-stayed bridge. The design of the robot system and performance of the NDT techniques associated with the cable inspection robot are discussed. A review on recent advances in emerging robot-based inspection technologies for bridge cables and current bridge cable inspection methods is also presented.

  3. Spread prestressed concrete slab beam bridges.

    DOT National Transportation Integrated Search

    2015-04-01

    TxDOT uses prestressed slab beam bridges for short-span bridges ranging from approximately 3050 ft in : length. These bridges have precast, pretensioned slab beams placed immediately adjacent to one another : with a cast-in-place slab made composi...

  4. Lean Construction Applications for Bridge Inspection

    DOT National Transportation Integrated Search

    2017-10-01

    Lean philosophy was used to analyze the efficiency of bridge inspection. Emphasis was put on identifying activities that add value to the final output, an owner approved bridge inspection report. 26 bridge inspections were shadowed. Time spent on bri...

  5. 77 FR 16784 - General Bridge Regulation; Amendment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-22

    ...] RIN 1625-AB36 General Bridge Regulation; Amendment AGENCY: Coast Guard, DHS. ACTION: Proposed rule... bridge regulations. The rulemaking was initiated to clarify the statutory responsibilities of bridge owners to remove their bridges from navigable waterways when they are no longer being used for land...

  6. Hydrodynamic forces on inundated bridge decks

    DOT National Transportation Integrated Search

    2009-05-01

    The hydrodynamic forces experienced by an inundated bridge deck have great importance in the design of bridges. Specifically, the drag force, lift force, and the moment acting on the bridge deck under various levels of inundation and a range of flow ...

  7. Hydraulic forces on submerged bridge decks.

    DOT National Transportation Integrated Search

    2008-09-01

    Bridge decks can be subjected to large horizontal forces when overtopping occurs. These forces may result in the displacement of bridge decks from the bents. This paper reports on the results of a laboratory study of horizontal forces on bridge decks...

  8. Development of Inspection Robots for Bridge Cables

    PubMed Central

    Kim, Se-Hoon; Lee, Jong-Jae

    2013-01-01

    This paper presents the bridge cable inspection robot developed in Korea. Two types of the cable inspection robots were developed for cable-suspension bridges and cable-stayed bridge. The design of the robot system and performance of the NDT techniques associated with the cable inspection robot are discussed. A review on recent advances in emerging robot-based inspection technologies for bridge cables and current bridge cable inspection methods is also presented. PMID:24459453

  9. 49 CFR 237.55 - Railroad bridge supervisors.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Railroad bridge supervisors. 237.55 Section 237.55..., DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Qualifications and Designations of Responsible Persons § 237.55 Railroad bridge supervisors. A railroad bridge supervisor shall be a person, regardless of...

  10. 23 CFR 650.307 - Bridge inspection organization.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... bridges located on public roads that are fully or partially located within the State's boundaries, except... inspected, all highway bridges located on public roads that are fully or partially located within the... preparation and maintenance of a bridge inventory. (2) Bridge inspections, reports, load ratings and other...

  11. 49 CFR 237.55 - Railroad bridge supervisors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Railroad bridge supervisors. 237.55 Section 237.55..., DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Qualifications and Designations of Responsible Persons § 237.55 Railroad bridge supervisors. A railroad bridge supervisor shall be a person, regardless of...

  12. The South Carolina bridge-scour envelope curves

    USGS Publications Warehouse

    Benedict, Stephen T.; Feaster, Toby D.; Caldwell, Andral W.

    2016-09-30

    The U.S. Geological Survey, in cooperation with the South Carolina Department of Transportation, conducted a series of three field investigations to evaluate historical, riverine bridge scour in the Piedmont and Coastal Plain regions of South Carolina. These investigations included data collected at 231 riverine bridges, which lead to the development of bridge-scour envelope curves for clear-water and live-bed components of scour. The application and limitations of the South Carolina bridge-scour envelope curves were documented in four reports, each report addressing selected components of bridge scour. The current investigation (2016) synthesizes the findings of these previous reports into a guidance manual providing an integrated procedure for applying the envelope curves. Additionally, the investigation provides limited verification for selected bridge-scour envelope curves by comparing them to field data collected outside of South Carolina from previously published sources. Although the bridge-scour envelope curves have limitations, they are useful supplementary tools for assessing the potential for scour at riverine bridges in South Carolina.

  13. Stabilization of electrically conducting capillary bridges using feedback control of radial electrostatic stresses and the shapes of extended bridges

    NASA Astrophysics Data System (ADS)

    Marr-Lyon, Mark J.; Thiessen, David B.; Blonigen, Florian J.; Marston, Philip L.

    2000-05-01

    Electrically conducting, cylindrical liquid bridges in a density-matched, electrically insulating bath were stabilized beyond the Rayleigh-Plateau (RP) limit using electrostatic stresses applied by concentric ring electrodes. A circular liquid cylinder of length L and radius R in real or simulated zero gravity becomes unstable when the slenderness S=L/2R exceeds π. The initial instability involves the growth of the so-called (2, 0) mode of the bridge in which one side becomes thin and the other side rotund. A mode-sensing optical system detects the growth of the (2, 0) mode and an analog feedback system applies the appropriate voltages to a pair of concentric ring electrodes positioned near the ends of the bridge in order to counter the growth of the (2, 0) mode and prevent breakup of the bridge. The conducting bridge is formed between metal disks which are grounded. Three feedback algorithms were tested and each found capable of stabilizing a bridge well beyond the RP limit. All three algorithms stabilized bridges having S as great as 4.3 and the extended bridges broke immediately when feedback was terminated. One algorithm was suitable for stabilization approaching S=4.493… where the (3, 0) mode is predicted to become unstable for cylindrical bridges. For that algorithm the equilibrium shapes of bridges that were slightly under or over inflated corresponded to solutions of the Young-Laplace equation with negligible electrostatic stresses. The electrical conductivity of the bridge liquid need not be large. The conductivity was associated with salt added to the aqueous bridge liquid.

  14. 33 CFR 118.140 - Painting bridge piers.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Painting bridge piers. 118.140 Section 118.140 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LIGHTING AND OTHER SIGNALS § 118.140 Painting bridge piers. The District Commander may require...

  15. 49 CFR 237.53 - Railroad bridge inspectors.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Railroad bridge inspectors. 237.53 Section 237.53..., DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Qualifications and Designations of Responsible Persons § 237.53 Railroad bridge inspectors. A railroad bridge inspector shall be a person who is determined by...

  16. 33 CFR 118.140 - Painting bridge piers.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Painting bridge piers. 118.140 Section 118.140 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LIGHTING AND OTHER SIGNALS § 118.140 Painting bridge piers. The District Commander may require...

  17. 49 CFR 237.53 - Railroad bridge inspectors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Railroad bridge inspectors. 237.53 Section 237.53..., DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Qualifications and Designations of Responsible Persons § 237.53 Railroad bridge inspectors. A railroad bridge inspector shall be a person who is determined by...

  18. 33 CFR 115.50 - Application for bridge permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Application for bridge permits... BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.50 Application for bridge permits. (a) Application. An application for authorization to construct a bridge across navigable waters of...

  19. 49 CFR 237.101 - Scheduling of bridge inspections.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Scheduling of bridge inspections. 237.101 Section... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.101 Scheduling of bridge inspections. (a) Each bridge management program shall include a provision for scheduling an...

  20. 49 CFR 237.101 - Scheduling of bridge inspections.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Scheduling of bridge inspections. 237.101 Section... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.101 Scheduling of bridge inspections. (a) Each bridge management program shall include a provision for scheduling an...

  1. Bridge scour monitoring technologies : development of evaluation and selection protocols for application on river bridges in Minnesota.

    DOT National Transportation Integrated Search

    2010-03-01

    Bridge failure or loss of structural integrity can result from scour of riverbed sediment near bridge abutments or : piers during high-flow events in rivers. In the past 20 years, several methods of monitoring bridge scour have been : developed spann...

  2. Simplified bridge load rating methodology using the national bridge inventory file : user manual

    DOT National Transportation Integrated Search

    1988-08-01

    The purpose of this research was to develop a computerized system to determine the adequacy of a bridge or group of bridges to carry specified overload vehicles. The system utilizes two levels of analysis. The Level 1 analysis is the basic rating sys...

  3. Simplified bridge load rating methodology using the national bridge inventory file : program listing

    DOT National Transportation Integrated Search

    1987-08-01

    The purpose of this research was to develop a computerized system to determine the adequacy of a bridge or group of bridges to carry specified overload vehicles. The system utilizes two levels of analysis. The Level 1 analysis is the basic rating sys...

  4. Bridge deficiency metric refinement : longer-term planning for state and locally-owned bridges.

    DOT National Transportation Integrated Search

    2010-06-01

    The focus of this study was to devise a prioritization scheme for locally-owned bridges and to extend the planning time horizon for state-owned bridges. The inherent nature of the local and county structures prevents a direct application of the formu...

  5. 49 CFR 236.713 - Bridge, movable.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Bridge, movable. 236.713 Section 236.713 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION... Bridge, movable. That section of a structure bridging a navigable waterway so designed that it may be...

  6. 49 CFR 236.713 - Bridge, movable.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Bridge, movable. 236.713 Section 236.713 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION... Bridge, movable. That section of a structure bridging a navigable waterway so designed that it may be...

  7. 33 CFR 118.90 - Bridges crossing channel obliquely.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Bridges crossing channel obliquely. 118.90 Section 118.90 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LIGHTING AND OTHER SIGNALS § 118.90 Bridges crossing channel obliquely. Bridges...

  8. 49 CFR 237.107 - Conduct of bridge inspections.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Conduct of bridge inspections. 237.107 Section 237... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.107 Conduct of bridge inspections. Bridge inspections shall be conducted under the direct supervision of a designated...

  9. 33 CFR 118.90 - Bridges crossing channel obliquely.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Bridges crossing channel obliquely. 118.90 Section 118.90 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LIGHTING AND OTHER SIGNALS § 118.90 Bridges crossing channel obliquely. Bridges...

  10. 49 CFR 237.107 - Conduct of bridge inspections.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Conduct of bridge inspections. 237.107 Section 237... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.107 Conduct of bridge inspections. Bridge inspections shall be conducted under the direct supervision of a designated...

  11. 33 CFR 115.50 - Application for bridge permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Application for bridge permits... BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.50 Application for bridge permits. (a) Approval of plans. An application for authorization to construct a bridge across navigable waters...

  12. Bridge deck fogging system : evaluation of field implementation of a fogging system used during bridge deck construction.

    DOT National Transportation Integrated Search

    2008-01-01

    The objective of this research was to implement and evaluate a fogging system used to provide initial cure for a concrete bridge deck construction project. To accomplish this, Bridges 5500 and 5701 along NM26 were selected. Bridge 5500 was placed usi...

  13. 33 CFR 165.1187 - Security Zones; Golden Gate Bridge and the San Francisco-Oakland Bay Bridge, San Francisco Bay...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Bridge and the San Francisco-Oakland Bay Bridge, San Francisco Bay, California. 165.1187 Section 165.1187... Limited Access Areas Eleventh Coast Guard District § 165.1187 Security Zones; Golden Gate Bridge and the San Francisco-Oakland Bay Bridge, San Francisco Bay, California. (a) Location. All waters extending...

  14. 33 CFR 165.1187 - Security Zones; Golden Gate Bridge and the San Francisco-Oakland Bay Bridge, San Francisco Bay...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Bridge and the San Francisco-Oakland Bay Bridge, San Francisco Bay, California. 165.1187 Section 165.1187... Limited Access Areas Eleventh Coast Guard District § 165.1187 Security Zones; Golden Gate Bridge and the San Francisco-Oakland Bay Bridge, San Francisco Bay, California. (a) Location. All waters extending...

  15. Reliability Modeling of Double Beam Bridge Crane

    NASA Astrophysics Data System (ADS)

    Han, Zhu; Tong, Yifei; Luan, Jiahui; Xiangdong, Li

    2018-05-01

    This paper briefly described the structure of double beam bridge crane and the basic parameters of double beam bridge crane are defined. According to the structure and system division of double beam bridge crane, the reliability architecture of double beam bridge crane system is proposed, and the reliability mathematical model is constructed.

  16. LIGHT BRIDGE IN A DEVELOPING ACTIVE REGION. I. OBSERVATION OF LIGHT BRIDGE AND ITS DYNAMIC ACTIVITY PHENOMENA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Toriumi, Shin; Katsukawa, Yukio; Cheung, Mark C. M., E-mail: shin.toriumi@nao.ac.jp

    Light bridges, the bright structures that divide the umbra of sunspots and pores into smaller pieces, are known to produce a wide variety of activity events in solar active regions (ARs). It is also known that the light bridges appear in the assembling process of nascent sunspots. The ultimate goal of this series of papers is to reveal the nature of light bridges in developing ARs and the occurrence of activity events associated with the light bridge structures from both observational and numerical approaches. In this first paper, exploiting the observational data obtained by Hinode, the Interface Region Imaging Spectrograph, andmore » the Solar Dynamics Observatory, we investigate the detailed structure of the light bridge in NOAA AR 11974 and its dynamic activity phenomena. As a result, we find that the light bridge has a weak, horizontal magnetic field, which is transported from the interior by a large-scale convective upflow and is surrounded by strong, vertical fields of adjacent pores. In the chromosphere above the bridge, a transient brightening occurs repeatedly and intermittently, followed by a recurrent dark surge ejection into higher altitudes. Our analysis indicates that the brightening is the plasma heating due to magnetic reconnection at lower altitudes, while the dark surge is the cool, dense plasma ejected from the reconnection region. From the observational results, we conclude that the dynamic activity observed in a light bridge structure such as chromospheric brightenings and dark surge ejections are driven by magnetoconvective evolution within the light bridge and its interaction with the surrounding magnetic fields.« less

  17. 33 CFR 118.65 - Lights on fixed bridges.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Lights on fixed bridges. 118.65 Section 118.65 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LIGHTING AND OTHER SIGNALS § 118.65 Lights on fixed bridges. (a) Each fixed bridge span over a navigable...

  18. 33 CFR 118.70 - Lights on swing bridges.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Lights on swing bridges. 118.70 Section 118.70 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LIGHTING AND OTHER SIGNALS § 118.70 Lights on swing bridges. (a) Swing span lights on through bridges. Each...

  19. Bridges and Equipment

    DTIC Science & Technology

    2009-09-15

    in.) Tire pressure +7 kPa (+1 psig) Ambient or chamber temperature +2 °C (+3.6 °F) Relative humidity (RH) +1% reading Wind speed +1 kt Distance... eccentric ), and number of bridge crossings. (4) Vehicle stopping data including speed, position, and direction on the bridge. (5) Ambient...fashion for initial trials, and then loads should be applied eccentrically . The load configuration as it was applied to the raft will be documented

  20. A data management infrastructure for bridge monitoring

    NASA Astrophysics Data System (ADS)

    Jeong, Seongwoon; Byun, Jaewook; Kim, Daeyoung; Sohn, Hoon; Bae, In Hwan; Law, Kincho H.

    2015-04-01

    This paper discusses a data management infrastructure framework for bridge monitoring applications. As sensor technologies mature and become economically affordable, their deployment for bridge monitoring will continue to grow. Data management becomes a critical issue not only for storing the sensor data but also for integrating with the bridge model to support other functions, such as management, maintenance and inspection. The focus of this study is on the effective data management of bridge information and sensor data, which is crucial to structural health monitoring and life cycle management of bridge structures. We review the state-of-the-art of bridge information modeling and sensor data management, and propose a data management framework for bridge monitoring based on NoSQL database technologies that have been shown useful in handling high volume, time-series data and to flexibly deal with unstructured data schema. Specifically, Apache Cassandra and Mongo DB are deployed for the prototype implementation of the framework. This paper describes the database design for an XML-based Bridge Information Modeling (BrIM) schema, and the representation of sensor data using Sensor Model Language (SensorML). The proposed prototype data management framework is validated using data collected from the Yeongjong Bridge in Incheon, Korea.

  1. Standard practice for washing and cleaning concrete bridge decks and substructure bridge seats including bridge bearings and expansion joints to prevent structural deterioration.

    DOT National Transportation Integrated Search

    2013-12-01

    This study is a supplement to a previous study of bridge washing practices that focused on steel : superstructures. This study examined the perceived costs and benefits of routine washing of both : steel and concrete bridges, with emphasis on substru...

  2. Virtual Bridge Design Challenge

    ERIC Educational Resources Information Center

    Mitts, Charles R.

    2013-01-01

    This design/problem-solving activity challenges students to design a replacement bridge for one that has been designated as either structurally deficient or functionally obsolete. The Aycock MS Technology/STEM Magnet Program Virtual Bridge Design Challenge is an authentic introduction to the engineering design process. It is a socially relevant…

  3. Strengthening bridges using composite materials.

    DOT National Transportation Integrated Search

    1998-03-01

    The objective of this research project is to outline methodologies for using Fiber Reinforced Polymer (FRP) composites to strengthen and rehabilitate reinforced concrete bridge elements. : Infrastructure deterioration and bridge strengthening techniq...

  4. 49 CFR 237.111 - Review of bridge inspection reports.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Review of bridge inspection reports. 237.111... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.111 Review of bridge inspection reports. Bridge inspection reports shall be reviewed by railroad bridge supervisors and railroad...

  5. 49 CFR 237.111 - Review of bridge inspection reports.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Review of bridge inspection reports. 237.111... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.111 Review of bridge inspection reports. Bridge inspection reports shall be reviewed by railroad bridge supervisors and railroad...

  6. Preservation treatment for wood bridge application

    Treesearch

    Jake Bigelow; Stan Lebow; Carol A. Clausen; Lowell Greimann; Terry J. Wipf

    2009-01-01

    Timber can often be a cost-effective construction material for new bridges. The durability of the bridge greatly depends on proper attention to construction details and fabrication, as well as proper preservative treatment before, during, and after construction. Material repair and replacement costs for bridges are a considerable expense for highway agencies. To...

  7. Remediation: Higher Education's Bridge to Nowhere

    ERIC Educational Resources Information Center

    Complete College America, 2012

    2012-01-01

    The intentions were noble. It was hoped that remediation programs would be an academic bridge from poor high school preparation to college readiness. Sadly, remediation has become instead higher education's "Bridge to Nowhere." This broken remedial bridge is travelled by some 1.7 million beginning students each year, most of whom will…

  8. Characterization of stormwater runoff from bridges in North Carolina and the effects of bridge deck runoff on receiving streams

    USGS Publications Warehouse

    Wagner, Chad R.; Fitzgerald, Sharon A.; Sherrell, Roy D.; Harned, Douglas A.; Staub, Erik L.; Pointer, Brian H.; Wehmeyer, Loren L.

    2011-01-01

    In 2008, the North Carolina General Assembly passed House Bill 2436 that required the North Carolina Department of Transportation (NCDOT) to study the water-quality effects of bridges on receiving streams. In response, the NCDOT and the U.S. Geological Survey (USGS) collaborated on a study to provide information necessary to address the requirements of the Bill. To better understand the effects of stormwater runoff from bridges on receiving streams, the following tasks were performed: (1) characterize stormwater runoff quality and quantity from a representative selection of bridges in North Carolina; (2) measure stream water quality upstream from selected bridges to compare bridge deck stormwater concentrations and loads to stream constituent concentrations and loads; and (3) determine if the chemistry of bed sediments upstream and downstream from selected bridges differs substantially based on presence or absence of a best management practice for bridge runoff.

  9. Estimation of potential bridge scour at bridges on state routes in South Dakota, 2003-07

    USGS Publications Warehouse

    Thompson, Ryan F.; Fosness, Ryan L.

    2008-01-01

    Flowing water can erode (scour) soils and cause structural failure of a bridge by exposing or undermining bridge foundations (abutments and piers). A rapid scour-estimation technique, known as the level-1.5 method and developed by the U.S. Geological Survey, was used to evaluate potential scour at bridges in South Dakota in a study conducted in cooperation with the South Dakota Department of Transportation. This method was used during 2003-07 to estimate scour for the 100-year and 500-year floods at 734 selected bridges managed by the South Dakota Department of Transportation on State routes in South Dakota. Scour depths and other parameters estimated from the level-1.5 analyses are presented in tabular form. Estimates of potential contraction scour at the 734 bridges ranged from 0 to 33.9 feet for the 100-year flood and from 0 to 35.8 feet for the 500-year flood. Abutment scour ranged from 0 to 36.9 feet for the 100-year flood and from 0 to 45.9 feet for the 500-year flood. Pier scour ranged from 0 to 30.8 feet for the 100-year flood and from 0 to 30.7 feet for the 500-year flood. The scour depths estimated by using the level-1.5 method can be used by the South Dakota Department of Transportation and others to identify bridges that may be susceptible to scour. Scour at 19 selected bridges also was estimated by using the level-2 method. Estimates of contraction, abutment, and pier scour calculated by using the level-1.5 and level-2 methods are presented in tabular and graphical formats. Compared to level-2 scour estimates, the level-1.5 method generally overestimated scour as designed, or in a few cases slightly underestimated scour. Results of the level-2 analyses were used to develop regression equations for change in head and average velocity through the bridge opening. These regression equations derived from South Dakota data are compared to similar regression equations derived from Montana and Colorado data. Future level-1.5 scour investigations in South

  10. Investigation of Aerodynamic Interference between Twin Deck Bridges

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sitek, M. A.; Bojanowski, C.; Lottes, S. A.

    2016-05-01

    Construction of a twin bridge can be a cost effective and minimally disruptive way to increase capacity when an existing bridge is not near the end of its service life. With ever growing vehicular traffic, when demand approaches the capacity of many existing roads and bridges. Remodeling a structure with an insufficient number of lanes can be a good solution in case of smaller and less busy bridges. Closing down or reducing traffic on crossings of greater importance for the construction period, however, can result in major delays and revenue loss for commerce and transportation as well as increasing themore » traffic load on alternate route bridges. Multiple-deck bridges may be the answer to this issue. A parallel deck can be built next to the existing one, without reducing the flow. Additionally, a new bridge can be designed as a twin or multi-deck structure. Several such structures have been built throughout the United States, among them: - The New NY Bridge Project - the Tappan Zee Hudson River Crossing, - SR-182 Columbia River Bridge, - The Thaddeus Kosciusko Bridge (I-87), - The Allegheny River Bridge, Pennsylvania, which carries I76, - Fred Hartman Bridge, TX, see Figure 1.2. With a growing number of double deck bridges, additional, more detailed, studies on the interaction of such bridge pairs in windy conditions appears appropriate. Aerodynamic interference effects should be examined to assure the aerodynamic stability of both bridges. There are many studies on aerodynamic response of single deck bridges, but the literature on double-deck structures is not extensive. The experimental results from wind tunnels are still limited in number, as a parametric study is required, they can be very time consuming. Literature review shows that some investigation of the effects of gap-width and angle of wind incidence has been done. Most of the CFD computational studies that have been done were limited to 2D simulations. Therefore, it is desirable to investigate twin

  11. Penile skin bridges: causes and prevention.

    PubMed

    Kamal, Baher A

    2009-01-01

    The pathogenesis and methods of prevention of penile skin bridges are discussed, with a review of the literature. This was a retrospective study on 57 adult men who presented with penile skin bridges at King Fahd University Hospital, Khobar, Saudi Arabia, over a period of approximately 22 years. All patients gave a history of circumcision during the first month after birth. The bridges were surgically excised. The skin bridges were single (23 patients) or multiple (34 patients). Their edges were attached to the distal penile shaft proximally and the glans distally. Their width varied from 1 mm to 3 cm. They were all successfully excised under local or general anesthesia. Penile skin bridges are a rare complication of neonatal circumcision. They are caused by skin adhesions that occur during childhood. With aging, the adhesions separate partially at the corona to form bridges. Careful suturing and good dressing at the time of circumcision are simple procedures that can prevent adherence of the distal prepetual skin flap to the glans penis.

  12. Structural health monitoring of Lindquist bridge

    NASA Astrophysics Data System (ADS)

    Sargent, D. D.; Murison, E. R.; Bakht, B.; Mufti, A. A.

    2007-04-01

    Many forestry bridges in Canada are typically single-lane, single span structures with two steel plate girders and a deck comprising of precast reinforced concrete panels. The concept of arching in deck slabs was utilized in the steel-free precast panels used in the Lindquist Bridge in British Columbia, Canada. The panels were completely devoid of tensile reinforcement and transverse confinement to the panels was provided by external steel straps. After the bridge was constructed in 1998, electrical strain gauges were installed on the girders and straps. Static and dynamic load tests were performed. The cracks on the top and bottom of the deck were mapped in 1999 and 2003. In 2006, a load test and crack mapping were performed on the bridge. The strain readings in the straps were compared with the data obtained 8 years prior. After analysis of the strain gauge readings, conclusions were drawn on the performance of the bridge. The cracks were formed to accommodate arching action and it was concluded that the bridge is still performing as it was designed.

  13. Evaluation of the service performance of bridge components.

    DOT National Transportation Integrated Search

    2004-08-01

    This study was initiated to provide review of common bridges to determine the performance of their components. Seven bridge types were selected that constituted 85 % of the Kentucky Transportation Cabinet (KYTC) bridge inventory. 319 bridges were ins...

  14. Bridge inspection / washing program : bridge drainage program

    DOT National Transportation Integrated Search

    2002-02-01

    The Rhode Island Department of Transportation, Operations Division is responsible for operation and maintenance of roads and bridges, and construction of highway and multi-modal projects to improve the transportation system of our state. One of the m...

  15. The Importance of Bridging

    ERIC Educational Resources Information Center

    Zamboni, Camilla

    2014-01-01

    In this article, I will discuss the importance of the fundamental aspect of "bridging" in the wider context of language teaching. I will use "bridging" particularly in terms of cultural differences and underline the pivotal role of specific techniques, in a language class as well as in a pedagogy class or seminar, to help…

  16. Vehicle - Bridge interaction, comparison of two computing models

    NASA Astrophysics Data System (ADS)

    Melcer, Jozef; Kuchárová, Daniela

    2017-07-01

    The paper presents the calculation of the bridge response on the effect of moving vehicle moves along the bridge with various velocities. The multi-body plane computing model of vehicle is adopted. The bridge computing models are created in two variants. One computing model represents the bridge as the Bernoulli-Euler beam with continuously distributed mass and the second one represents the bridge as the lumped mass model with 1 degrees of freedom. The mid-span bridge dynamic deflections are calculated for both computing models. The results are mutually compared and quantitative evaluated.

  17. Phase and widening construction of steel bridges : [summary].

    DOT National Transportation Integrated Search

    2014-03-01

    Maintaining traffic flow for bridge widening and replacement projects often requires bridges to be constructed in phases so that traffic can travel on one : portion of the bridge while another portion is being : constructed. The bridge portions are t...

  18. Seismic response of precast segmental bridge superstructures.

    DOT National Transportation Integrated Search

    2006-12-01

    Precast segmental construction of bridges can accelerate construction and minimize the cost of bridges in highly congested urban environments and environmentally sensitive regions. Despite their proven benefits, the use of precast segmental bridges i...

  19. Uncontrolled concrete bridge parapet cracking.

    DOT National Transportation Integrated Search

    2013-06-01

    The Ohio Department of Transportation has recently identified the problem of wide-spread premature cracking of concrete bridge : parapets throughout its District 12 region (Northeast Ohio). Many of the bridge decks that contain these prematurely crac...

  20. Virginia Bridge Information Systems Laboratory.

    DOT National Transportation Integrated Search

    2014-06-01

    This report presents the results of applied data mining of legacy bridge databases, focusing on the Pontis and : National Bridge Inventory databases maintained by the Virginia Department of Transportation (VDOT). Data : analysis was performed using a...

  1. Integrated 3D bridge-condition visualization (BCV) to facilitate element-based bridge condition rating (EBCR).

    DOT National Transportation Integrated Search

    2015-11-01

    Routine inspection and maintenance records are essential for bridges to function well throughout their intended lifespan. : Although existing bridge management systems are efficient at data storage, it is difficult to conduct comprehensive data : ana...

  2. Key Royale bridge five year evaluation : [summary].

    DOT National Transportation Integrated Search

    2013-06-01

    The Florida Department of Transportation (FDOT) : maintains more than 6,500 bridges. Considering : the expense of repair and replacement of bridges, : extending their durability and service life is : important. Of special concern for bridges in : mar...

  3. Precast alternative for flat slab bridges : final report.

    DOT National Transportation Integrated Search

    2013-10-26

    The cast-in-place (CIP) concrete slab bridge and the hollow core flat slab bridge are two very common bridge types utilized by the : South Carolina Department of Transportation (SCDOT). The CIP bridge is durable but has a long construction time while...

  4. Controlled impact demonstration airframe bending bridges

    NASA Technical Reports Server (NTRS)

    Soltis, S. J.

    1986-01-01

    The calibration of the KRASH and DYCAST models for transport aircraft is discussed. The FAA uses computer analysis techniques to predict the response of controlled impact demonstration (CID) during impact. The moment bridges can provide a direct correlation between the predictive loads or moments that the models will predict and what was experienced during the actual impact. Another goal is to examine structural failure mechanisms and correlate with analytical predictions. The bending bridges did achieve their goals and objectives. The data traces do provide some insight with respect to airframe loads and structural response. They demonstrate quite clearly what's happening to the airframe. A direct quantification of metal airframe loads was measured by the moment bridges. The measured moments can be correlated with the KRASH and DYCAST computer models. The bending bridge data support airframe failure mechanisms analysis and provide residual airframe strength estimation. It did not appear as if any of the bending bridges on the airframe exceeded limit loads. (The observed airframe fracture was due to the fuselage encounter with the tomahawk which tore out the keel beam.) The airframe bridges can be used to estimate the impact conditions and those estimates are correlating with some of the other data measurements. Structural response, frequency and structural damping are readily measured by the moment bridges.

  5. FHWA LTBP Bridge Performance Primer

    DOT National Transportation Integrated Search

    2014-02-01

    This TechBrief defines bridge performance and discusses the importance of measuring performance and current practices for doing so. It identifies key issues to improving performance measures and the role the Long-Term Bridge Performance (LTBP) Progra...

  6. Colorado statewide historic bridge inventory.

    DOT National Transportation Integrated Search

    2011-05-01

    The purpose of the Colorado statewide historic bridge inventory was to document and evaluate the National : Register of Historic Places eligibility all on-system highway bridges and grade separation structures built in : Colorado between 1959 and 196...

  7. Bridge Frost Prediction by Heat and Mass Transfer Methods

    NASA Astrophysics Data System (ADS)

    Greenfield, Tina M.; Takle, Eugene S.

    2006-03-01

    Frost on roadways and bridges can present hazardous conditions to motorists, particularly when it occurs in patches or on bridges when adjacent roadways are clear of frost. To minimize materials costs, vehicle corrosion, and negative environmental impacts, frost-suppression chemicals should be applied only when, where, and in the appropriate amounts needed to maintain roadways in a safe condition for motorists. Accurate forecasts of frost onset times, frost intensity, and frost disappearance (e.g., melting or sublimation) are needed to help roadway maintenance personnel decide when, where, and how much frost-suppression chemical to use. A finite-difference algorithm (BridgeT) has been developed that simulates vertical heat transfer in a bridge based on evolving meteorological conditions at its top and bottom as supplied by a weather forecast model. BridgeT simulates bridge temperatures at numerous points within the bridge (including its upper and lower surface) at each time step of the weather forecast model and calculates volume per unit area (i.e., depth) of deposited, melted, or sublimed frost. This model produces forecasts of bridge surface temperature, frost depth, and bridge condition (i.e., dry, wet, icy/snowy). Bridge frost predictions and bridge surface temperature are compared with observed and measured values to assess BridgeT's skill in forecasting bridge frost and associated conditions.

  8. Design of piles for integral abutment bridges.

    DOT National Transportation Integrated Search

    1984-08-01

    More and more, integral abutment bridges are being used in place : of the more traditional bridge designs with expansion releases. In : this study, states which use integral abutment bridges were surveyed : to determine their current practice in the ...

  9. GRS bridge piers and abutments.

    DOT National Transportation Integrated Search

    2001-01-01

    This report presents the following three recent projects on load testing of geosynthetic-reinforced soil (GRS) bridge abutments and piers: a full-scale bridge pier load test conducted by the Turner-Fairbank Highway Research Center, Federal Highway Ad...

  10. Hydraulic and geomorphic monitoring of experimental bridge scour mitigation at selected bridges in Utah, 2003-05

    USGS Publications Warehouse

    Kenney, Terry A.; McKinney, Tim S.

    2006-01-01

    Unique bridge scour mitigation designs using concrete A-Jacks were developed by the Utah Department of Transportation and installed at the Colorado River Bridge at State Road 191 and the Green River Bridge at State Road 19. The U.S. Geological Survey monitored stream reaches at these sites by collecting streambed-topography and water-velocity data from 2003 through 2005. These data were acquired annually from a moving boat with an acoustic Doppler current profiler and a differential global positioning system. Raw unordered data were processed and readied for interpolation into organized datasets with DopplerMacros, a set of computer programs. Processed streambed topography data were geostatistically interpolated by using Ordinary Kriging, and inverse distance weighting interpolation was used in the development of the two-dimensional velocity datasets. These organized datasets of topography and velocity were developed for each survey of the two bridge sites. A comparison of the riverbed topography data for each survey was done. An increase in bed elevation related to the installation of the A-Jacks scour countermeasures is evident at the Colorado River Bridge at State Road 191. The three topographic datasets acquired after the installation at the Green River Bridge at State Road 19 show few changes.

  11. Hydraulic analysis of the Schoharie Creek bridge

    USGS Publications Warehouse

    Froehlich, David C.; Trent, Roy E.

    1989-01-01

    Ten people died on April 5, 1987 as a result of the collapse of two spans of a New York State Thruway bridge into the floodwaters of Schoharie Creek. The cause of the bridge failure was determined to be scour of bed material from under the foundations of piers supporting the bridge. To evaluate the hydraulic conditions that produced the scour, a two-dimensional finite element surface-water flow model was constructed. The model was used to obtain a detailed description of water-surface elevations and depth-averaged velocities within a reach that extends from about 4000 ft downstream of the bridge to about 6000 ft upstream of the bridge.

  12. Performance analysis of LAN bridges and routers

    NASA Technical Reports Server (NTRS)

    Hajare, Ankur R.

    1991-01-01

    Bridges and routers are used to interconnect Local Area Networks (LANs). The performance of these devices is important since they can become bottlenecks in large multi-segment networks. Performance metrics and test methodology for bridges and routers were not standardized. Performance data reported by vendors is not applicable to the actual scenarios encountered in an operational network. However, vendor-provided data can be used to calibrate models of bridges and routers that, along with other models, yield performance data for a network. Several tools are available for modeling bridges and routers - Network II.5 was used. The results of the analysis of some bridges and routers are presented.

  13. Estimating bridge stiffness using a forced-vibration technique for timber bridge health monitoring

    Treesearch

    James P. Wacker; Xiping Wang; Brian Brashaw; Robert J. Ross

    2006-01-01

    This paper describes an effort to refine a global dynamic testing technique for evaluating the overall stiffness of timber bridge superstructures. A forced vibration method was used to measure the frequency response of several simple-span, sawn timber beam (with plank deck) bridges located in St. Louis County, Minnesota. Static load deflections were also measured to...

  14. Field performance of timber bridges. 11, Spearfish Creek stress-laminated box-beam bridge

    Treesearch

    J. P. Wacker; M. A. Ritter; K. Stanfill-McMillan

    The Spearfish Creek bridge was constructed in 1992 in Spearfish, South Dakota. It is a single-span, stress-laminated, box-beam superstructure. Performance of the bridge is being monitored for 5 years, beginning at installation. This report summarizes results for the first 3-1/2 years of monitoring and includes information on the design, construction, and field...

  15. Procedures for scour assessments at bridges in Pennsylvania

    USGS Publications Warehouse

    Cinotto, Peter J.; White, Kirk E.

    2000-01-01

    Scour is the process and result of flowing water eroding the bed and banks of a stream. Scour at nearly 14,300 bridges(1) spanning water, and the stability of river and stream channels in Pennsylvania, are being assessed by the U.S. Geological Survey (USGS) in cooperation with the Pennsylvania Department of Transportation (PennDOT). Procedures for bridge-scour assessments have been established to address the needs of PennDOT in meeting a 1988 Federal Highway Administration mandate requiring states to establish a program to assess all public bridges over water for their vulnerability to scour. The procedures also have been established to help develop an understanding of the local and regional factors that affect scour and channel stability. This report describes procedures for the assessment of scour at all bridges that are 20 feet or greater in length that span water in Pennsylvania. There are two basic types of assessment: field-viewed bridge site assessments, for which USGS personnel visit the bridge site, and office-reviewed bridge site assessments, for which USGS personnel compile PennDOT data and do not visit the bridge site. Both types of assessments are primarily focused at assisting PennDOT in meeting the requirements of the Federal Highway Administration mandate; however, both assessments include procedures for the collection and processing of ancillary data for subsequent analysis. Date of bridge construction and the accessibility of the bridge substructure units for inspection determine which type of assessment a bridge receives. A Scour-Critical Bridge Indicator Code and a Scour Assessment Rating are computed from selected collected and compiled data. PennDOT personnel assign the final Scour-Critical Bridge Indicator Code and a Scour Assessment Rating on the basis of their review of all data. (1)Words presented in bold type are defined in the Glossary section of this report.

  16. Rating and analysis of continuous girder bridges.

    DOT National Transportation Integrated Search

    1980-01-01

    Federal regulations prompted as a result of bridge failures require the rating of bridge structures for which federal funds will be utilized for rehabilitation and replacement. The large number of bridges in Virginia subject to being rated makes such...

  17. Design aids of NU I-girders bridges.

    DOT National Transportation Integrated Search

    2010-05-01

    Precast prestressed concrete I-Girder bridges have become the most dominant bridge system in the United States. In the early design : stages, preliminary design becomes a vital first step in designing an economical bridge. Within the state of Nebrask...

  18. Faster bridge construction using precast substructures : brief.

    DOT National Transportation Integrated Search

    2011-07-01

    Bridge replacement often requires road closures and detours that frustrate road users. It remains a key goal of Wisconsin DOT to reduce construction-related road use interruptions. This will be a challenge with bridges: Bridge inspections in 2007 ide...

  19. Hillsboro Canal bridge monitoring : [summary].

    DOT National Transportation Integrated Search

    2011-01-01

    Floridas inventory of 148 moveable bridges is : the largest in the nation. Most employ open grid : steel decks, which have important advantages : over solid bridge decks: they can be assembled in : the factory, are lightweight and easy to install;...

  20. BUILDING "BRIDGES" WITH QUALITY ASSURANCE

    EPA Science Inventory

    The papr describes how, rather than building "bridges" across centuries, quality assurance (QA) personnel have the opportunity to build bridges across technical disciplines, between public and private organizations, and between different QA groups. As reviewers and auditors of a...

  1. Monitoring bridge scour using fiber optic sensors.

    DOT National Transportation Integrated Search

    2015-04-01

    The scouring process excavates and carries away materials from the bed and banks of streams, and from : around the piers and abutments of bridges. Scour undermines bridges and may cause bridge failures due to : structural instability. In the last 30 ...

  2. Covered Bridge Security Manual

    Treesearch

    Brett Phares; Terry Wipf; Ryan Sievers; Travis Hosteng

    2013-01-01

    The design, construction, and use of covered timber bridges is all but a lost art in these days of pre-stressed concrete, high-performance steel, and the significant growth both in the volume and size of vehicles. Furthermore, many of the existing covered timber bridges are preserved only because of their status on the National Registry of Historic Places or the...

  3. Public response to bridge colors.

    DOT National Transportation Integrated Search

    1973-01-01

    To determine people's reactions to bridges painted in colors as white, yellow, green, blue, red, brown, black, and aluminum, two test bridges were selected in Charlottesville, Virginia. One was painted a different color each month and the other was k...

  4. Evaluation of bridge deck sealers.

    DOT National Transportation Integrated Search

    2014-06-01

    This study focuses on the evaluation of bridge deck sealers commonly used on highway bridge decks and : their relative performance. After reviewing the most up-to-date research findings on chemical sealers used : by state DOTs, four sealer products t...

  5. Fatigue risks in the connections of sign support structures : [technical brief].

    DOT National Transportation Integrated Search

    2013-07-01

    The latest edition of the AASHTO design specifications (AASHTO 2001) introduced provisions for fatigue design. However, many structures presently in service were designed before fatigue provisions were part of the design specifications. The fatigue d...

  6. Evaluation of the Buena Vista IBRD bridge : a furthering of accelerated bridge construction in Iowa.

    DOT National Transportation Integrated Search

    2012-02-01

    The need to construct bridges that last longer, are less expensive, and take less time to build has increased. The importance of accelerated bridge construction (ABC) technologies has been realized by the Federal Highway Administration (FHWA) and the...

  7. Geotextile reinforced bridge approach embankment : Lake River Bridge - Malin Highway , Klamath County, Oregon : final report.

    DOT National Transportation Integrated Search

    1997-08-01

    An experimental construction method was evaluated at the Lost River Bridge in Klamath County to reduce the discontinuity between the bridge and the roadway. The method included combining soil in six 300-mm lifts interlaced with geotextile reinforceme...

  8. 49 CFR 237.33 - Content of bridge management programs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Content of bridge management programs. 237.33... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Railroad Bridge Safety Assurance § 237.33 Content of bridge management programs. Each bridge management program adopted in compliance with this part...

  9. 49 CFR 237.31 - Adoption of bridge management programs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Adoption of bridge management programs. 237.31... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Railroad Bridge Safety Assurance § 237.31 Adoption of bridge management programs. Each track owner shall adopt a bridge safety management program to...

  10. 49 CFR 237.31 - Adoption of bridge management programs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Adoption of bridge management programs. 237.31... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Railroad Bridge Safety Assurance § 237.31 Adoption of bridge management programs. Each track owner shall adopt a bridge safety management program to...

  11. 49 CFR 237.33 - Content of bridge management programs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Content of bridge management programs. 237.33... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Railroad Bridge Safety Assurance § 237.33 Content of bridge management programs. Each bridge management program adopted in compliance with this part...

  12. Salt bridge as a gatekeeper against partial unfolding.

    PubMed

    Hinzman, Mark W; Essex, Morgan E; Park, Chiwook

    2016-05-01

    Salt bridges are frequently observed in protein structures. Because the energetic contribution of salt bridges is strongly dependent on the environmental context, salt bridges are believed to contribute to the structural specificity rather than the stability. To test the role of salt bridges in enhancing structural specificity, we investigated the contribution of a salt bridge to the energetics of native-state partial unfolding in a cysteine-free version of Escherichia coli ribonuclease H (RNase H*). Thermolysin cleaves a protruding loop of RNase H(*) through transient partial unfolding under native conditions. Lys86 and Asp108 in RNase H(*) form a partially buried salt bridge that tethers the protruding loop. Investigation of the global stability of K86Q/D108N RNase H(*) showed that the salt bridge does not significantly contribute to the global stability. However, K86Q/D108N RNase H(*) is greatly more susceptible to proteolysis by thermolysin than wild-type RNase H(*) is. The free energy for partial unfolding determined by native-state proteolysis indicates that the salt bridge significantly increases the energy for partial unfolding by destabilizing the partially unfolded form. Double mutant cycles with single and double mutations of the salt bridge suggest that the partially unfolded form is destabilized due to a significant decrease in the interaction energy between Lys86 and Asp108 upon partial unfolding. This study demonstrates that, even in the case that a salt bridge does not contribute to the global stability, the salt bridge may function as a gatekeeper against partial unfolding that disturbs the optimal geometry of the salt bridge. © 2016 The Protein Society.

  13. Bridge Scour Measurements Using the Rfid Technology

    NASA Astrophysics Data System (ADS)

    Moustakidis, I.; Tsakiris, A. G.; Papanicolaou, T.

    2010-12-01

    The main purpose of this project is to develop a system for continuous monitoring scour around bridge piers and abutments (i.e. bridge scour) using the Radio Frequency IDentification (RFID) technology and examine its applicability for estimating scour around a pier or an existing bridge. Excessive bridge scour can compromise the bridge foundations and lead to dramatic bridge collapses with significant impacts on economy and traveling public safety. An RFID system consists of three main components: the low frequency reader (~134.2 kHz frequency), the transponder (derived from transmitter/responder) and the antenna (of rectangular shape with one or more loops). RFID is a technology that permits the wireless two-way transfer of information from a reader to a transponder via RF waves transmitted with an antenna. What makes RFIDs suitable for monitoring bridge scour is that no line of sight is necessary between the reader and the transponder, which can be detected even when it is buried in the bed substrate. The proposed system for monitoring bridge scour relies on the principle that transponders oriented perpendicular to antenna plane can be detected at longer distances, than transponders oriented parallel to it. We intend to attach transponders at predetermined locations (depths) along a chain with known length. The chain will subsequently be driven into the bed substrate at the location where bridge scour hole is expected within the detection range of the antenna, which will be installed directly above the chain. The chain will retain the transponders perpendicular to the antenna plane, so that they can be continuously detected. Once scour takes place, the transponders will be oriented parallel to the antenna plane and thus they will not be detected. The latter will indicate that bridge scour reached the known depth, at which the transponder was initially buried. Once a prototype RFID system is functional, future research will aim at combining it with satellite

  14. IceBridge: Bringing a Field Campaign Home

    NASA Astrophysics Data System (ADS)

    Woods, J.; Beck, J.; Bartholow, S.

    2015-12-01

    IceBridge, a six-year NASA mission, is the largest airborne survey of Earth's polar ice ever flown. It will yield an unprecedented three-dimensional view of Arctic and Antarctic ice sheets, ice shelves and sea ice. These flights will provide a yearly, multi-instrument look at the behavior of the rapidly changing features of the Greenland and Antarctic ice. Data collected during IceBridge will help scientists bridge the gap in polar observations between NASA's Ice, Cloud and Land Elevation Satellite (ICESat) -- in orbit since 2003 -- and ICESat-2, planned for 2017. ICESat stopped collecting science data in 2009, making IceBridge critical for ensuring a continuous series of observations. IceBridge will use airborne instruments to map Arctic and Antarctic areas once a year at a minimum, with new campaigns being developed during the Arctic melt season. IceBridge flights are conducted in the spring and summer for the Arctic and in the fall over Antarctica. Other smaller airborne surveys around the world are also part of the IceBridge campaign. IceBridge actively engages the public and educators through a variety of outlets ranging from communications strategies through social media outlets, to larger organized efforts such as PolarTREC. In field activities include blog posts, photo updates, in flight chat sessions, and more intensive live events to include google hangouts, where field team members can interact with the public during a scheduled broadcast. The IceBridge team provides scientists and other team members with the training and support to become communicators in their own right. There is an exciting new initiative where IceBridge will be collaborating with Undergraduate and Graduate students to integrate the next generation of scientists and communicators into the Science Teams. This will be explored through partnerships with institutions that are interested in mentoring through project based initiatives.

  15. Rapid replacement/construction of bridges.

    DOT National Transportation Integrated Search

    2012-11-01

    Bridges are a key element of the transportation system because they control system capacity and are normally built at : the highest cost to the system. Once a bridge reaches its useful design service life, it needs to be replaced or : reconstructed i...

  16. Field monitoring of mechanically stabilized earth walls to investigate secondary reinforcement effects.

    DOT National Transportation Integrated Search

    2015-12-01

    Mechanically stabilized earth (MSE) walls have been commonly used in highway construction. AASHTO (2007) has : detailed design procedures for such a wall system. In the current AASHTO design, only primary reinforcements are used in : relatively large...

  17. Field monitoring of mechanically stabilized earth walls to investigate secondary reinforcement effects : [technical summary].

    DOT National Transportation Integrated Search

    2015-12-01

    Mechanically stabilized earth (MSE) walls have been commonly used in highway : construction. AASHTO (2007) has detailed design procedures for such a wall system. : In the current AASHTO design, only primary reinforcements are used in relatively : lar...

  18. Advanced bridge safety initiative : live load testing and load rating of the Evans Brook Bridge (#5506) and the Hastings Bridge (#5507) in Batchelders Grant, Maine.

    DOT National Transportation Integrated Search

    2014-01-01

    The Advanced Structures and Composites Center at the University of Maine (UMaine) performed live load testing : and rating factor analysis for two bridges (No. 5506 and No. 5507) in Batchelders Grant, Maine. The bridge load : rating performed by cons...

  19. 49 CFR 237.51 - Railroad bridge engineers.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... engineering work to be performed: (1) Determine the forces and stresses in railroad bridges and bridge... 49 Transportation 4 2013-10-01 2013-10-01 false Railroad bridge engineers. 237.51 Section 237.51 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION...

  20. 49 CFR 237.51 - Railroad bridge engineers.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... engineering work to be performed: (1) Determine the forces and stresses in railroad bridges and bridge... 49 Transportation 4 2012-10-01 2012-10-01 false Railroad bridge engineers. 237.51 Section 237.51 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION...

  1. 49 CFR 237.51 - Railroad bridge engineers.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... engineering work to be performed: (1) Determine the forces and stresses in railroad bridges and bridge... 49 Transportation 4 2014-10-01 2014-10-01 false Railroad bridge engineers. 237.51 Section 237.51 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION...

  2. 49 CFR 237.51 - Railroad bridge engineers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... engineering work to be performed: (1) Determine the forces and stresses in railroad bridges and bridge... 49 Transportation 4 2010-10-01 2010-10-01 false Railroad bridge engineers. 237.51 Section 237.51 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION...

  3. 49 CFR 237.51 - Railroad bridge engineers.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... engineering work to be performed: (1) Determine the forces and stresses in railroad bridges and bridge... 49 Transportation 4 2011-10-01 2011-10-01 false Railroad bridge engineers. 237.51 Section 237.51 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION...

  4. 49 CFR 236.387 - Movable bridge locking.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Movable bridge locking. 236.387 Section 236.387 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION... and Tests § 236.387 Movable bridge locking. Movable bridge locking shall be tested at least once a...

  5. 49 CFR 236.387 - Movable bridge locking.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Movable bridge locking. 236.387 Section 236.387 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION... and Tests § 236.387 Movable bridge locking. Movable bridge locking shall be tested at least once a...

  6. Assessment of limestone blended cements for transportation applications : final report.

    DOT National Transportation Integrated Search

    2017-09-01

    This research assessed the applicability of Type IL cements satisfying AASHTO M 240 specifications for use in transportation applications in place of Type I/II cements which satisfy AASHTO M 85 specifications for construction of transportation struct...

  7. Phase II : correlation between experimental and finite element analysis : Alaska bridge 255-Chulitna River bridge.

    DOT National Transportation Integrated Search

    2014-09-01

    In this study, we will monitor the behavior of the Alaska Chulitna Bridge for the specific purpose of assisting the DOT in performing an accurate : condition assessment of this bridge. : Based on the state-of-the-art SHM knowledge and technologies wi...

  8. 33 CFR 118.85 - Lights on vertical lift bridges.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Lights on vertical lift bridges... BRIDGES BRIDGE LIGHTING AND OTHER SIGNALS § 118.85 Lights on vertical lift bridges. (a) Lift span lights. The vertical lift span of every vertical lift bridge shall be lighted so that the center of the...

  9. 33 CFR 118.85 - Lights on vertical lift bridges.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Lights on vertical lift bridges... BRIDGES BRIDGE LIGHTING AND OTHER SIGNALS § 118.85 Lights on vertical lift bridges. (a) Lift span lights. The vertical lift span of every vertical lift bridge shall be lighted so that the center of the...

  10. Maximal liquid bridges between horizontal cylinders

    NASA Astrophysics Data System (ADS)

    Cooray, Himantha; Huppert, Herbert E.; Neufeld, Jerome A.

    2016-08-01

    We investigate two-dimensional liquid bridges trapped between pairs of identical horizontal cylinders. The cylinders support forces owing to surface tension and hydrostatic pressure that balance the weight of the liquid. The shape of the liquid bridge is determined by analytically solving the nonlinear Laplace-Young equation. Parameters that maximize the trapping capacity (defined as the cross-sectional area of the liquid bridge) are then determined. The results show that these parameters can be approximated with simple relationships when the radius of the cylinders is small compared with the capillary length. For such small cylinders, liquid bridges with the largest cross-sectional area occur when the centre-to-centre distance between the cylinders is approximately twice the capillary length. The maximum trapping capacity for a pair of cylinders at a given separation is linearly related to the separation when it is small compared with the capillary length. The meniscus slope angle of the largest liquid bridge produced in this regime is also a linear function of the separation. We additionally derive approximate solutions for the profile of a liquid bridge, using the linearized Laplace-Young equation. These solutions analytically verify the above-mentioned relationships obtained for the maximization of the trapping capacity.

  11. Modeling walker synchronization on the Millennium Bridge.

    PubMed

    Eckhardt, Bruno; Ott, Edward; Strogatz, Steven H; Abrams, Daniel M; McRobie, Allan

    2007-02-01

    On its opening day the London Millennium footbridge experienced unexpected large amplitude wobbling subsequent to the migration of pedestrians onto the bridge. Modeling the stepping of the pedestrians on the bridge as phase oscillators, we obtain a model for the combined dynamics of people and the bridge that is analytically tractable. It provides predictions for the phase dynamics of individual walkers and for the critical number of people for the onset of oscillations. Numerical simulations and analytical estimates reproduce the linear relation between pedestrian force and bridge velocity as observed in experiments. They allow prediction of the amplitude of bridge motion, the rate of relaxation to the synchronized state and the magnitude of the fluctuations due to a finite number of people.

  12. Permeability and stability of base and subbase materials : appendices A-Q, August 2000.

    DOT National Transportation Integrated Search

    2000-08-01

    This study determined the hydraulic conductivities, effective porosities and resilient moduli of several current and proposed drainable base materials. The materials studied were AASHTO No. 57, AASHTO No. 67, ODOT No. 304, ODOT No. 310, Iowa DOT No. ...

  13. Permeability and stability of base and subbase materials : final report, August 2000.

    DOT National Transportation Integrated Search

    2000-08-01

    This study determined the hydraulic conductivities, effective porosities and resilient moduli of several current and proposed drainable base materials. The materials studied were AASHTO No. 57, AASHTO No. 67, ODOT No. 304, ODOT No. 310, Iowa DOT No. ...

  14. Permeability and stability of base and subbase materials : executive summary, August 2000.

    DOT National Transportation Integrated Search

    2000-08-01

    This study determined the hydraulic conductivities, effective porosities and resilient moduli of several current and proposed drainable base materials. The materials studied were AASHTO No. 57, AASHTO No. 67, ODOT No. 304, ODOT No. 310, Iowa DOT No. ...

  15. Stability Limits and Dynamics of Nonaxisymmetric Liquid Bridges

    NASA Technical Reports Server (NTRS)

    Alexander, J. Iwan D.; Slobozhanin, Lev A.; Resnick, Andrew H.; Ramus, Jean-Francois; Delafontaine, Sylvie

    1999-01-01

    Liquid bridges have been the focus of numerous theoretical and experimental investigations since the early work by Plateau more than a century ago. More recently, motivated by interest in their physical behavior and their occurrence in a variety of technological situations, there has been a resurgence of interest in the static and dynamic behavior of liquid bridges. Furthermore, opportunities to carry out experiments in the near weightless environment of a low-Earth-orbit spacecraft have also led to a number of low-gravity experiments involving large liquid bridges. In this paper, we present selected results from our work concerning the stability of nonaxisymmetric liquid bridges, the bifurcation of weightless bridges in the neighborhood of the maximum volume stability limit, isorotating axisymmetric bridges contained between equidimensional disks, and bridges contained between unequal disks. For the latter, we discuss both theoretical and experimental results. Finally, we present results concerning the stability of axisymmetric equilibrium configurations for a capillary liquid partly contained in a closed circular cylinder.

  16. Guardrails for use on historic bridges : volume 1--replacement strategies.

    DOT National Transportation Integrated Search

    2016-11-01

    Bridges that are designated historic present a special challenge to bridge engineers whenever rehabilitation work or improvements are : made to the bridges. Federal and state laws protect historically significant bridges, and railings on these bridge...

  17. Dynamic Interaction of Long Suspension Bridges with Running Trains

    NASA Astrophysics Data System (ADS)

    XIA, H.; XU, Y. L.; CHAN, T. H. T.

    2000-10-01

    This paper presents an investigation of dynamic interaction of long suspension bridges with running trains. A three-dimensional finite element model is used to represent a long suspension bridge. Each 4-axle vehicle in a train is modelled by a 27-degrees-of-freedom dynamic system. The dynamic interaction between the bridge and train is realized through the contact forces between the wheels and track. By applying a mode superposition technique to the bridge only and taking the measured track irregularities as known quantities, the number of degrees of freedom (d.o.f.) the bridge-train system is significantly reduced and the coupled equations of motion are efficiently solved. The proposed formulation and the associated computer program are then applied to a real long suspension bridge carrying a railway within the bridge deck. The dynamic response of the bridge-train system and the derail and offload factors related to the running safety of the train are computed. The results show that the formulation presented in this paper can well predict dynamic behaviors of both bridge and train with reasonable computation efforts. Dynamic interaction between the long suspension bridge and train is not significant.

  18. Highway bridge inspection : state-of-the-practice survey

    DOT National Transportation Integrated Search

    2001-04-01

    The congressionally mandated National Bridge Inspection program requires States to periodically inventory, inspect, and rate all highway bridges on public roads. The National Bridge Inspection Standards, implemented in 1971, prescribe minimum require...

  19. Polymer concrete bridge deck overlays : Deschutes River Bridge (Biggs) and Maupin Bridge (Maupin) : final report.

    DOT National Transportation Integrated Search

    1995-07-01

    This report documents the construction and performance of two thin polymer concrete (with polyester/styrene resins) bridge deck overlays. The overlays were constructed in Biggs and Maupin, Oregon in June 1993. : Several problems were encountered duri...

  20. 23 CFR 500.106 - PMS.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... process that provides information for use in implementing cost-effective pavement reconstruction, rehabilitation, and preventative maintenance programs and that results in pavements designed to accommodate... the “AASHTO Guidelines for Pavement Management Systems.” 1 1 AASHTO Guidelines for Pavement Management...

  1. 23 CFR 500.106 - PMS.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... process that provides information for use in implementing cost-effective pavement reconstruction, rehabilitation, and preventative maintenance programs and that results in pavements designed to accommodate... the “AASHTO Guidelines for Pavement Management Systems.” 1 1 AASHTO Guidelines for Pavement Management...

  2. 23 CFR 500.106 - PMS.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... process that provides information for use in implementing cost-effective pavement reconstruction, rehabilitation, and preventative maintenance programs and that results in pavements designed to accommodate... the “AASHTO Guidelines for Pavement Management Systems.” 1 1 AASHTO Guidelines for Pavement Management...

  3. 23 CFR 500.106 - PMS.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... process that provides information for use in implementing cost-effective pavement reconstruction, rehabilitation, and preventative maintenance programs and that results in pavements designed to accommodate... the “AASHTO Guidelines for Pavement Management Systems.” 1 1 AASHTO Guidelines for Pavement Management...

  4. The effect of environmental factors on the implementation of the Mechanistic-empirical pavement design guide (MEPDG).

    DOT National Transportation Integrated Search

    2011-07-01

    Current pavement design based on the AASHTO Design Guide uses an empirical approach from the results of the AASHO Road Test conducted in 1958. To address some of the limitations of the original design guide, AASHTO developed a new guide: Mechanistic ...

  5. 23 CFR 500.106 - PMS.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... process that provides information for use in implementing cost-effective pavement reconstruction, rehabilitation, and preventative maintenance programs and that results in pavements designed to accommodate... the “AASHTO Guidelines for Pavement Management Systems.” 1 1 AASHTO Guidelines for Pavement Management...

  6. Assessment of high early strength limestone blended cement for next generation transportation structures : final report.

    DOT National Transportation Integrated Search

    2016-12-01

    This research on Type IL cements for high early strength concretes demonstrated that Type IL cements satisfying AASHTO M 240 specifications may be used in place of Type I/II cements which satisfy AASHTO M 85 specifications for construction of transpo...

  7. Wind tunnel test of musi VI bridge

    NASA Astrophysics Data System (ADS)

    Permata, Robby; Andika, Matza Gusto; Syariefatunnisa, Risdhiawan, Eri; Hermawan, Budi; Noordiana, Indra

    2017-11-01

    Musi VI Bridge is planned to cross the Musi River in Palembang City, South Sumatera Province, Indonesia. The main span is a steel arch type with 200 m length and side span length is 75 m. Finite element analysis results showed that the bridge has frequency ratio for torsional and heaving mode (torsional frequency/heaving frequency)=1.14. This close to unity value rises concern about aerodynamic behaviour and stability of the bridge deck under wind loading. Sectional static and free vibration wind tunnel test were performed to clarify this phenomena in B2TA3 facility in Serpong, Indonesia. The test followed the draft of Guide of Wind Tunnel Test for Bridges developed by Indonesian Ministry of Public Works. Results from wind tunnel testing show that the bridge is safe from flutter instability and no coupled motion vibration observed. Therefore, low value of frequency ratio has no effect to aerodynamic behaviour of the bridge deck. Vortex-induced vibration in heaving mode occurred in relatively low wind velocity with permissible maximum amplitude value.

  8. A Bridge to Active Learning: A Summer Bridge Program Helps Students Maximize Their Active-Learning Experiences and the Active-Learning Experiences of Others

    PubMed Central

    Cooper, Katelyn M.; Ashley, Michael; Brownell, Sara E.

    2017-01-01

    National calls to improve student academic success in college have sparked the development of bridge programs designed to help students transition from high school to college. We designed a 2-week Summer Bridge program that taught introductory biology content in an active-learning way. Through a set of exploratory interviews, we unexpectedly identified that Bridge students had developed sophisticated views of active learning, even though this was not an explicit goal of the program. We conducted an additional set of semistructured interviews that focused on active learning and compared the interviews of Bridge students with those from non-Bridge students who had been eligible for but did not participate in the program. We used the constant comparative method to identify themes from the interviews. We found that Bridge students perceived that, because they knew how to approach active learning and viewed it as important, they benefited more from active learning in introductory biology than non-Bridge students. Specifically, Bridge students seemed to be more aware of their own learning gains from participating in active learning. Compared with the majority of non-Bridge students, the majority of Bridge students described using a greater variety of strategies to maximize their experiences in active learning. Finally, in contrast to non-Bridge students, Bridge students indicated that they take an equitable approach to group work. These findings suggest that we may be able to prime students to maximize their own and other’s experiences in active learning. PMID:28232588

  9. Toll bridge report to the California legislature, FY 2001 - 02

    DOT National Transportation Integrated Search

    2002-01-01

    In the San Francisco Bay Area, eight toll bridges serve as essential transportation arteries for the traveling public. Seven of the bridges are state-owned: the Antioch Bridge, the Benicia-Martinez Bridge, the Carquinez Bridge, the Richmond-San Rafae...

  10. Concrete bridge deck condition assessment and improvement strategies.

    DOT National Transportation Integrated Search

    2004-11-01

    The aging and deterioration of bridges in Utah mandates increasingly cost-effective strategies for bridge maintenance, rehabilitation, and repair (MR&R). Although the substructures and superstructures of bridges in Utah are in relatively good structu...

  11. 0-6722 : spread prestressed concrete slab beam bridges.

    DOT National Transportation Integrated Search

    2014-08-01

    The Texas Department of Transportation uses : precast prestressed concrete slab beam bridges for : shorter-span bridges of approximately 3050 ft in : length. Conventional slab beam bridges have slab : beams placed immediately adjacent to one anoth...

  12. Final report bridge design system analysis and modernization.

    DOT National Transportation Integrated Search

    2016-09-27

    The Bridge Design System (BDS) is an in-house software program developed by the Michigan Department of Transportations : (MDOT) Bridge Design Unit. The BDS designs bridges according to the required specifications, and outputs corresponding design ...

  13. Building Bridges One Line at a Time

    ERIC Educational Resources Information Center

    Grigsby, Cathy Murray

    2012-01-01

    In this article, first-grade students were taught the different kinds of lines that were part of the construction of various bridges--the curved lines of the arches of stone bridges, straight lines connecting the cables of a suspension bridge, vertical lines, horizontal lines, and so on. They gained practice in drawing structures and in fine brush…

  14. Characterization of railroad bridge service interruptions.

    DOT National Transportation Integrated Search

    2013-02-01

    The Federal Railroad Administration contracted Transportation Technology Center, Inc., to study bridge problems that cause accidents or service interruptions and to use this information to evaluate the need to develop bridge monitoring systems. Exist...

  15. Assessment of Bridging Requirements and Current Bridging Capabilities for use of Legacy Heavy Forces Inside the Contemporary Operational Environment

    DTIC Science & Technology

    2003-01-01

    vehicle-launched bridge (AVLB), the medium-girder bridge (MGB) and the Ribbon Bridge. The AVLB is capable of crossing 17-meter gaps using a crew under ... armor protection (FM 5-34, 2001). The MGB is capable of crossing single spans of 46.2 meters with the addition of a “link-reinforcement system” that

  16. Why the water bridge does not collapse

    NASA Astrophysics Data System (ADS)

    Aerov, Artem A.

    2011-09-01

    In 2007 an interesting phenomenon was discovered [J. Phys. DJPAPBE0022-372710.1088/0022-3727/40/19/052 40, 6112 (2007)]: a horizontal thread of water, the so-called water bridge, hangs in a horizontal electrostatic field. A different explanation of the water bridge stability is proposed herein: the force supporting it is the surface tension of water, while the role of the electric field is to not allow the water bridge to reduce its surface energy by breaking into separate drops. It is proven that electrostatic field is not the origin of the tension holding the bridge.

  17. 23 CFR 650.705 - Application for discretionary bridge funds.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Application for discretionary bridge funds. 650.705... TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Discretionary Bridge Candidate Rating Factor § 650.705 Application for discretionary bridge funds. Each year through its field offices, the FHWA will...

  18. 23 CFR 650.705 - Application for discretionary bridge funds.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Application for discretionary bridge funds. 650.705... TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Discretionary Bridge Candidate Rating Factor § 650.705 Application for discretionary bridge funds. Each year through its field offices, the FHWA will...

  19. New conceptual design of portable bamboo bridge for emergency purposes

    NASA Astrophysics Data System (ADS)

    Musthaffa, A. A.; Nor, N. M.; Yusof, M. A.; Yuhazri, M. Y.

    2018-02-01

    Portable bridges serve as routes for troops during the military operations and the disaster relief operation. Nowadays, bamboo has been regarded as one of the alternative construction materials for building and bridge structures. This paper presents the conceptual design of the portable bridge. Several types of portable bridges and bamboo bridges are reviewed in the current work. The characteristics, capability and method of construction of each bridge are discussed. Finally, the conceptual of the portable bamboo bridge for emergency purposes is presented. The idea of producing portable bridge is proposed in the current work as it is crucial for providing route for communities affected by natural disasters.

  20. A cloud-based information repository for bridge monitoring applications

    NASA Astrophysics Data System (ADS)

    Jeong, Seongwoon; Zhang, Yilan; Hou, Rui; Lynch, Jerome P.; Sohn, Hoon; Law, Kincho H.

    2016-04-01

    This paper describes an information repository to support bridge monitoring applications on a cloud computing platform. Bridge monitoring, with instrumentation of sensors in particular, collects significant amount of data. In addition to sensor data, a wide variety of information such as bridge geometry, analysis model and sensor description need to be stored. Data management plays an important role to facilitate data utilization and data sharing. While bridge information modeling (BrIM) technologies and standards have been proposed and they provide a means to enable integration and facilitate interoperability, current BrIM standards support mostly the information about bridge geometry. In this study, we extend the BrIM schema to include analysis models and sensor information. Specifically, using the OpenBrIM standards as the base, we draw on CSI Bridge, a commercial software widely used for bridge analysis and design, and SensorML, a standard schema for sensor definition, to define the data entities necessary for bridge monitoring applications. NoSQL database systems are employed for data repository. Cloud service infrastructure is deployed to enhance scalability, flexibility and accessibility of the data management system. The data model and systems are tested using the bridge model and the sensor data collected at the Telegraph Road Bridge, Monroe, Michigan.

  1. Diagnostic evaluation and repair of deteriorated concrete bridges.

    DOT National Transportation Integrated Search

    2004-12-01

    Concrete bridge deck degradation has been observed in several bridges located in north Mississippi. In this study a : survey was conducted to collect and document instances of deterioration in concrete bridges located throughout the State. The : main...

  2. Compilation of accelerated bridge construction (ABC) bridges : final report.

    DOT National Transportation Integrated Search

    2016-01-01

    Development of accelerated bridge construction (ABC) technologies has been occurring across the country, many times in : isolation. Although FHWA and others have worked to facilitate communication between these efforts, there was not a : comprehensiv...

  3. Verification of Texas superheavy load criteria for bridges.

    DOT National Transportation Integrated Search

    2011-11-01

    This report evaluates TxDOT criteria for the superheavy loads that trigger bridge analyses to determine : whether the criteria adequately protects Texas bridges. Researchers used solid modeling calibrated with a : bridge test of a 3-span continuous s...

  4. Diagnostic evaluation and repair of deteriorated concrete bridges

    DOT National Transportation Integrated Search

    2004-12-01

    Concrete bridge deck degradation has been observed in several bridges located in north Mississippi. In this study a survey was conducted to collect and document instances of deterioration in concrete bridges located throughout the State. The main cau...

  5. Developing a Tele-Robotic Platform for Bridge Inspection

    DOT National Transportation Integrated Search

    2011-05-01

    There are many bridges in Virginia with high traffic volumes or difficult access conditions which make these bridges difficult and expensive to inspect. In addition, the inspection of many bridges exposes the inspectors to hazardous conditions such a...

  6. Geosynthetic reinforced soil for low-volume bridge abutments.

    DOT National Transportation Integrated Search

    2012-01-01

    This report presents a review of literature on geosynthetic reinforced soil (GRS) bridge abutments, and test results and analysis from two : field demonstration projects (Bridge 1 and Bridge 2) conducted in Buchanan County, Iowa, to evaluate the feas...

  7. 25 CFR 170.507 - Who reviews bridge inspection reports?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false Who reviews bridge inspection reports? 170.507 Section... ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Bridge Inspection § 170.507 Who reviews bridge inspection reports? The person responsible for the bridge inspection...

  8. A Hierarchical Analysis of Bridge Decision Makers ... The Role of New Technology Adoption in the Timber Bridge Market: Special Project

    Treesearch

    Robert L. Smith; Robert J. Bush; Daniel L. Schmoldt

    1995-01-01

    Bridge design engineers and local highway officials make bridge replacement decisions across the United States. The Analytical Hierarchy Process was used to characterize the bridge material selection decision of these individuals. State Department of Transportation engineers, private consulting engineers, and local highway officials were personally interviewed in...

  9. Characterization of bridge foundations workshop report.

    DOT National Transportation Integrated Search

    2013-11-01

    "In 2013, the Federal Highway Administration proposed a new research program for the characterization of bridge foundations. To narrow the focus and develop a research roadmap for the program, a workshop on Characterization of Bridge Foundations...

  10. Environmental impacts of bridge cleaning operations.

    DOT National Transportation Integrated Search

    2003-02-01

    Cleaning (washing) operations of existing leaded paints on bridges were studied to determine the level of lead contamination in the resulting wastewater. Twelve experimental overcoating projects were let on bridges with various types of existing pain...

  11. Characterization of bridge foundations workshop report.

    DOT National Transportation Integrated Search

    2013-11-01

    In 2013, the Federal Highway Administration proposed a new research program for the characterization of bridge : foundations. To narrow the focus and develop a research roadmap for the program, a workshop on : Characterization of Bridge Foundation...

  12. Stability limits and dynamics of nonaxisymmetric liquid bridges

    NASA Technical Reports Server (NTRS)

    Alexander, J. Iwan D.; Resnik, Andy; Kaukler, William F.

    1993-01-01

    This program of theoretical and experimental ground-based and low gravity research is focussed on the understanding of the dynamics and stability limits of nonaxisymmetric liquid bridges. There are three basic objectives to the proposed work: (1) to determine the stability limits of nonaxisymmetric liquid bridges held between non-coaxially aligned disks; (2) to examine the dynamics of nonaxisymmetric bridges and nonaxisymmetric oscillations of initially axisymmetric bridges (some of these experiments require a low gravity environment and the ground-based research will culminate in a definitive flight experiment); and (3) to experimentally investigate the vibration sensitivity of liquid bridges under terrestrial and low gravity conditions.

  13. IceBridge team members

    NASA Image and Video Library

    2013-11-13

    These IceBridge team members aboard a huge U.S. Air Force C-17 transport aircraft are ready to step out into the cold Antarctic air. The C-17 aircraft that fly to Antarctica are operated by the U.S. Air Force's 62nd and 446th Airlift Wings based at Joint Base Lewis-McChord near Seattle, Wash. Credit: NASA/Goddard/Michael Studinger NASA's Operation IceBridge is an airborne science mission to study Earth's polar ice. For more information about IceBridge, visit: www.nasa.gov/icebridge NASA image use policy. NASA Goddard Space Flight Center enables NASA’s mission through four scientific endeavors: Earth Science, Heliophysics, Solar System Exploration, and Astrophysics. Goddard plays a leading role in NASA’s accomplishments by contributing compelling scientific knowledge to advance the Agency’s mission. Follow us on Twitter Like us on Facebook Find us on Instagram

  14. Developing a bridge scour warning system : technical summary.

    DOT National Transportation Integrated Search

    2016-09-01

    Flooding and scour can be major threats to the integrity of bridges. During flood events, : scour at bridge piers and abutments can undermine the foundations of the bridge, causing : significant damage or even total structure loss. Because scour occu...

  15. Methods of modifying historic bridges for contemporary use.

    DOT National Transportation Integrated Search

    1980-01-01

    Studied by a team of experts in the fields of history, bridge engineering, architecture, and computer analysis were 21 old truss bridges of historical importance located in Virginia. These old bridges are narrow and have low load-carrying capacities,...

  16. Developing a bridge scour warning system : final report.

    DOT National Transportation Integrated Search

    2016-09-01

    Flooding and scour can be major threats to the integrity of bridges. During flood events, scour at bridge piers : and abutments can undermine the foundations of the bridge, causing significant damage or even total structure loss. : Because scour occu...

  17. 49 CFR 237.71 - Determination of bridge load capacities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Determination of bridge load capacities. 237.71... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Capacity of Bridges § 237.71 Determination of bridge load capacities. (a) Each track owner shall determine the load capacity of each of its...

  18. 49 CFR 237.71 - Determination of bridge load capacities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Determination of bridge load capacities. 237.71... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Capacity of Bridges § 237.71 Determination of bridge load capacities. (a) Each track owner shall determine the load capacity of each of its...

  19. Scour damage to Vermont bridges and scour monitoring.

    DOT National Transportation Integrated Search

    2015-06-01

    Scour is by far the primary cause of bridge failures in the United States. Regionally, the : vulnerability of bridges to flood damage became evident from the damage seen to Vermont : bridges in the 2011 Tropical Storm Irene. Successfully mitigating s...

  20. Real time assessment of dynamic loads on bridges.

    DOT National Transportation Integrated Search

    2013-05-01

    Highway bridges are an important class of civil structures that are subject to continuously : acting and varying dynamic loads due to traffic. A large number of highway bridges in the US : (bridges on interstate highways or state highways which have ...

  1. Evaluation of Virginia's first heated bridge.

    DOT National Transportation Integrated Search

    2000-12-01

    This study is a contribution to the Heated Bridge Technology Program established in 1991 under the Intermodal Surface Transportation Efficiency Act. The goal of the program was to find durable and environmentally friendly heated bridge technologies f...

  2. Bridge response due to temperature variations.

    DOT National Transportation Integrated Search

    2014-05-01

    In order to more accurately quantify the behavior and degradation of bridges throughout their service life, the : Federal Highway Administration lunched the Long-Term Bridge Performance Program. As part of this program : an I-girder, integral abutmen...

  3. 33 CFR 118.110 - Daymarks and lateral lighting on bridges.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... bridges. 118.110 Section 118.110 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LIGHTING AND OTHER SIGNALS § 118.110 Daymarks and lateral lighting on bridges. (a... through bridges with U.S. aids to navigation system lateral marks and lights installed on the...

  4. 33 CFR 118.110 - Daymarks and lateral lighting on bridges.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... bridges. 118.110 Section 118.110 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LIGHTING AND OTHER SIGNALS § 118.110 Daymarks and lateral lighting on bridges. (a... through bridges with U.S. aids to navigation system lateral marks and lights installed on the...

  5. Monitoring system of arch bridge for safety network management

    NASA Astrophysics Data System (ADS)

    Joo, Bong Chul; Yoo, Young Jun; Lee, Chin Hyung; Park, Ki Tae; Hwang, Yoon Koog

    2010-03-01

    Korea has constructed the safety management network monitoring test systems for the civil infrastructure since 2006 which includes airport structure, irrigation structure, railroad structure, road structure, and underground structure. Bridges among the road structure include the various superstructure types which are Steel box girder bridge, suspension bridge, PSC-box-girder bridge, and arch bridge. This paper shows the process of constructing the real-time monitoring system for the arch bridge and the measured result by the system. The arch type among various superstructure types has not only the structural efficiency but the visual beauty, because the arch type superstructure makes full use of the feature of curve. The main measuring points of arch bridges composited by curved members make a difference to compare with the system of girder bridges composited by straight members. This paper also shows the method to construct the monitoring system that considers the characteristic of the arch bridge. The system now includes strain gauges and thermometers, and it will include various sensor types such as CCTV, accelerometers and so on additionally. For the long term and accuracy monitoring, the latest optical sensors and equipments are applied to the system.

  6. A Comparison of Limb-Socket Kinematics of Bone-Bridging and Non-Bone-Bridging Wartime Transtibial Amputations

    DTIC Science & Technology

    2012-05-16

    each successive loading interval. Subset analysis was performed on the basis of amputation type (bone bridging or non bone bridging) and suspension...fitting, patient care. Washington, DC: US Government Printing Office; 1969. 2. Ertl J. Uber amputationsstumpfe. Chirurg. 1949;20:218 24. 3. Pinto MA

  7. I-5/Gilman advanced technology bridge project

    NASA Astrophysics Data System (ADS)

    Lanza di Scalea, Francesco; Karbhari, Vistasp M.; Seible, Frieder

    2000-04-01

    The UCSD led I-5/Gilman Advanced Technology Bridge Project will design and construct a fully functional traffic bridge of advanced composite materials across Interstate 5 in La Jolla, California. Its objective is to demonstrate the use of advanced composite technologies developed by the aerospace industry in commercial applications to increase the life expectancy of new structures and for the rehabilitation of aging infrastructure components. The structure will be a 450 ft long, 60 ft wide cable-stayed bridge supported by a 150 ft A-frame pylon with two vehicular lanes, two bicycle lanes, pedestrian walkways and utility tunnels. The longitudinal girders and pylon will be carbon fiber shells filled with concrete. The transverse deck system will consist of hollow glass/carbon hybrid tubes and a polypropylene fiber reinforced concrete deck with an arch action. Selected cables will be composite. The bridge's structural behavior will be monitored to determine how advanced composite materials perform in civil infrastructure applications. The bridge will be instrumented to obtain performance and structural health data in real time and, where possible, in a remote fashion. The sensors applied to the bridge will include electrical resistance strain gages, fiberoptic Bragg gratings and accelerometers.

  8. 3. CONTEXTUAL VIEW OF BRIDGE IN SETTING, LOOKING SOUTHWEST FROM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. CONTEXTUAL VIEW OF BRIDGE IN SETTING, LOOKING SOUTHWEST FROM ELEVATED GRADE OF EUREKA SOUTHERN RAILROAD. EUREKA SOUTHERN TRUSS BRIDGE AT EXTREME LEFT, 1924 HIGHWAY BRIDGE IN CENTER, 1952 HIGHWAY BRIDGE AT RIGHT - Van Duzen River Bridge, Spanning Van Duzen River at CA State Highway 101, Alton, Humboldt County, CA

  9. 25. VIEW OF McGREGOR BRIDGE (18811936), CROSSING THE MERRIMACK RIVER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    25. VIEW OF McGREGOR BRIDGE (1881-1936), CROSSING THE MERRIMACK RIVER AT BRIDGE STREET, LOOKING SOUTHEAST. NORTH ELEVATION OF DOUBLE-DECKED, THREE-SPAN DOUGLAS PATENT PARABOLIC IRON TRUSS ERECTED BY CORRUGATED METAL COMPANY (BERLIN IRON BRIDGE COMPANY, BERLIN, CT) From 'Bridge Street Bridge', photographer and date unknown. - Notre Dame Bridge, Spanning Merrimack River on Bridge Street, Manchester, Hillsborough County, NH

  10. Free energy landscape of a minimalist salt bridge model.

    PubMed

    Li, Xubin; Lv, Chao; Corbett, Karen M; Zheng, Lianqing; Wu, Dongsheng; Yang, Wei

    2016-01-01

    Salt bridges are essential to protein stability and dynamics. Despite the importance, there has been scarce of detailed discussion on how salt bridge partners interact with each other in distinct solvent exposed environments. In this study, employing a recent generalized orthogonal space tempering (gOST) method, we enabled efficient molecular dynamics simulation of repetitive breaking and reforming of salt bridge structures within a minimalist salt-bridge model, the Asp-Arg dipeptide and thereby were able to map its detailed free energy landscape in aqueous solution. Free energy surface analysis shows that although individually-solvated states are more favorable, salt-bridge states still occupy a noticeable portion of the overall population. Notably, the competing forces, e.g. intercharge attractions that drive the formation of salt bridges and solvation forces that pull the charged groups away from each other, are energetically comparable. As the result, the salt bridge stability is highly tunable by local environments; for instance when local water molecules are perturbed to interact more strongly with each other, the population of the salt-bridge states is likely to increase. Our results reveal the critical role of local solvent structures in modulating salt-bridge partner interactions and imply the importance of water fluctuations on conformational dynamics that involves solvent accessible salt bridge formations. © 2015 The Protein Society.

  11. Dynamic testing of the T223 bridge rail.

    DOT National Transportation Integrated Search

    2009-09-01

    The TxDOT T203 bridge rail is often used on bridges where asphalt overlays reduce the effective : height of the bridge rail. This reduction in height due to asphalt paving overlay is undesirable. For this : project, several geometric features were ch...

  12. Implementation of heat-straightening repairs for Louisiana bridges.

    DOT National Transportation Integrated Search

    1998-12-01

    The goal of this study was to implement the latest heat-straightening repair technology on a Louisiana Bridge. The bridge chosen was an overpass just east of Lake Charles crossing 1-10. Working with both state and district personnel, the bridge was r...

  13. Advanced bridge safety initiative: phase 2, task 1 - rivet testing of rivets taken from Maine truss bridge.

    DOT National Transportation Integrated Search

    2016-03-01

    The Maine Department of Transportation (MaineDOT) has removed 25 rivets from an existing, older truss bridge. : Many such truss bridges have low rating factors as determined using Federal Highway Administration (FHWA) : and the American Association o...

  14. Suicides by jumping from iconic bridges in Hong Kong.

    PubMed

    Wong, P W C; Chan, W S C; Lau, T K; Morgan, P R; Yip, P S F

    2009-01-01

    Three bridges in Hong Kong have become iconic sites for suicide since their openings 11 years ago. This retrospective record-based study aimed to examine suicides by jumping from a group of three iconic bridges in Hong Kong, and to explore potential preventive strategies on these bridges to prevent future suicide. We examined the Coroner's files of 12 people who killed themselves by jumping from the bridges between 1997 and 2007. We also examined the Coroner's files of other suicides in 2003, and compared them with the bridge suicides. The majority of the suicides were male, middle-age (40-59 years), married or cohabiting, not living alone, employed or self-employed, and in financial difficulty. None of these cases had a reported psychiatric diagnosis or psychiatric care history, and only one case had a history of suicidal attempt. Compared with other suicides in Hong Kong, the bridge jumpers were more likely to be younger, holding a job, indebted, free from a psychiatric and attempt history, and to leave a suicide note (p < .05). The bridge suicide cases in Hong Kong also appeared to be different from the profiles of bridge jumpers in other countries. Erection of an effective safety barrier has been found to prevent bridge suicides in many countries. Given the different characteristics of bridge jumpers in Hong Kong and the technical difficulties, more innovative ways may be needed to prevent suicides by such means. Potential prevention measures are discussed and, hopefully, will better inform the future design and development of bridges of significance.

  15. Bridge deck deterioration study : final report.

    DOT National Transportation Integrated Search

    1975-03-01

    The basic purpose of this study was to investigate three bridges in the northern section of Louisiana in an attempt to determine if there is sufficient deterioration and corrosion of the reinforcing steel to warrant a comprehensive study of bridge de...

  16. Construction of crack-free bridge decks.

    DOT National Transportation Integrated Search

    2017-04-01

    This serves as the final report on Transportation Pooled-Fund Program Project No. TPF-5(174), Construction : of Crack-Free Bridge Decks. The goal of the study was to implement the most cost-effective techniques for : improving bridge deck life ...

  17. Bridge-Scour Data Management System user's manual

    USGS Publications Warehouse

    Landers, Mark N.; Mueller, David S.; Martin, Gary R.

    1996-01-01

    The Bridge-Scour Data Management System (BSDMS) supports preparation, compilation, and analysis of bridge-scour data. The BSDMS provides interactive storage, retrieval, selection, editing, and display of bridge-scour data sets. Bridge-scour data sets include more than 200 site and measurement attributes of the channel geometry, flow hydraulics, hydrology, sediment, geomorphic-setting, location, and bridge specifications. This user's manual provides a general overview of the structure and organization of BSDMS data sets and detailed instructions to operate the program. Attributes stored by the BSDMS are described along with an illustration of the input screen where the attribute can be entered or edited. Measured scour depths can be compared with scour depths predicted by selected published equations using the BSDMS. The selected published equations available in the computational portion of the BSDMS are described. This manual is written for BSDMS, version 2.0. The data base will facilitate: (1) developing improved estimators of scour for specific regions or conditions; (2) describing scour processes; and (3) reducing risk from scour at bridges. BSDMS is available in DOS and UNIX versions. The program was written to be portable and, therefore, can be used on multiple computer platforms. Installation procedures depend on the computer platform, and specific installation instructions are distributed with the software. Sample data files and data sets of 384 pier-scour measurements from 56 bridges in 14 States are also distributed with the software.

  18. Foot force models of crowd dynamics on a wobbly bridge

    PubMed Central

    Belykh, Igor; Jeter, Russell; Belykh, Vladimir

    2017-01-01

    Modern pedestrian and suspension bridges are designed using industry standard packages, yet disastrous resonant vibrations are observed, necessitating multimillion dollar repairs. Recent examples include pedestrian-induced vibrations during the opening of the Solférino Bridge in Paris in 1999 and the increased bouncing of the Squibb Park Bridge in Brooklyn in 2014. The most prominent example of an unstable lively bridge is the London Millennium Bridge, which started wobbling as a result of pedestrian-bridge interactions. Pedestrian phase locking due to footstep phase adjustment is suspected to be the main cause of its large lateral vibrations; however, its role in the initiation of wobbling was debated. We develop foot force models of pedestrians’ response to bridge motion and detailed, yet analytically tractable, models of crowd phase locking. We use biomechanically inspired models of crowd lateral movement to investigate to what degree pedestrian synchrony must be present for a bridge to wobble significantly and what is a critical crowd size. Our results can be used as a safety guideline for designing pedestrian bridges or limiting the maximum occupancy of an existing bridge. The pedestrian models can be used as “crash test dummies” when numerically probing a specific bridge design. This is particularly important because the U.S. code for designing pedestrian bridges does not contain explicit guidelines that account for the collective pedestrian behavior. PMID:29296679

  19. Foot force models of crowd dynamics on a wobbly bridge.

    PubMed

    Belykh, Igor; Jeter, Russell; Belykh, Vladimir

    2017-11-01

    Modern pedestrian and suspension bridges are designed using industry standard packages, yet disastrous resonant vibrations are observed, necessitating multimillion dollar repairs. Recent examples include pedestrian-induced vibrations during the opening of the Solférino Bridge in Paris in 1999 and the increased bouncing of the Squibb Park Bridge in Brooklyn in 2014. The most prominent example of an unstable lively bridge is the London Millennium Bridge, which started wobbling as a result of pedestrian-bridge interactions. Pedestrian phase locking due to footstep phase adjustment is suspected to be the main cause of its large lateral vibrations; however, its role in the initiation of wobbling was debated. We develop foot force models of pedestrians' response to bridge motion and detailed, yet analytically tractable, models of crowd phase locking. We use biomechanically inspired models of crowd lateral movement to investigate to what degree pedestrian synchrony must be present for a bridge to wobble significantly and what is a critical crowd size. Our results can be used as a safety guideline for designing pedestrian bridges or limiting the maximum occupancy of an existing bridge. The pedestrian models can be used as "crash test dummies" when numerically probing a specific bridge design. This is particularly important because the U.S. code for designing pedestrian bridges does not contain explicit guidelines that account for the collective pedestrian behavior.

  20. Hierarchical analysis of bridge decision makers : the role of new technology adoption in the timber bridge market : special project fiscal year 1992

    DOT National Transportation Integrated Search

    1995-08-01

    Bridge design engineers and local highway officials make bridge replacement decisions across the : United States. The Analytical Hierarchy Process was used to characterize the bridge material selection : decision of these individuals. State Departmen...

  1. Strengthening of rural bridges using rapid-installation FRP technology : route 63 bridge no. H356, Phelps County.

    DOT National Transportation Integrated Search

    2009-10-01

    This report presents the use of externally bonded fiber reinforced polymers (FRP) laminates for the flexural strengthening of a : concrete bridge. The bridge selected for this project is a two-span simply supported reinforced concrete slab with no tr...

  2. Research notes : polymer concrete bridge deck overlays : Deschutes River Bridge (Biggs), Maupin Bridge (Maupin) : final report.

    DOT National Transportation Integrated Search

    1995-07-01

    This report documents the construction and performance of two thin polymer concrete (with polyester/styrene resins) bridge deck overlays. The overlays were constructed in Biggs and Maupin, Oregon in June 1993. Construction of the overlays was less th...

  3. Debris mitigation methods for bridge piers.

    DOT National Transportation Integrated Search

    2012-06-01

    Debris accumulation on bridge piers is an on-going national problem that can obstruct the waterway openings at bridges and result in significant erosion of stream banks and scour at abutments and piers. In some cases, the accumulation of debris can a...

  4. Chapter 10:Hardwoods for timber bridges

    Treesearch

    James P. Wacker; Ed T. Cesa

    2005-01-01

    This chapter describes the joint efforts of the Forest Service and the FHWA to administer national programs including research, demonstration bridges, and technology transfer components. Summary information on a number of Forest Service-WIT demonstration bridges constructed with hardwoods is also provided.

  5. A Bridge to Active Learning: A Summer Bridge Program Helps Students Maximize Their Active-Learning Experiences and the Active-Learning Experiences of Others.

    PubMed

    Cooper, Katelyn M; Ashley, Michael; Brownell, Sara E

    2017-01-01

    National calls to improve student academic success in college have sparked the development of bridge programs designed to help students transition from high school to college. We designed a 2-week Summer Bridge program that taught introductory biology content in an active-learning way. Through a set of exploratory interviews, we unexpectedly identified that Bridge students had developed sophisticated views of active learning, even though this was not an explicit goal of the program. We conducted an additional set of semistructured interviews that focused on active learning and compared the interviews of Bridge students with those from non-Bridge students who had been eligible for but did not participate in the program. We used the constant comparative method to identify themes from the interviews. We found that Bridge students perceived that, because they knew how to approach active learning and viewed it as important, they benefited more from active learning in introductory biology than non-Bridge students. Specifically, Bridge students seemed to be more aware of their own learning gains from participating in active learning. Compared with the majority of non-Bridge students, the majority of Bridge students described using a greater variety of strategies to maximize their experiences in active learning. Finally, in contrast to non-Bridge students, Bridge students indicated that they take an equitable approach to group work. These findings suggest that we may be able to prime students to maximize their own and other's experiences in active learning. © 2017 K. M. Cooper et al. CBE—Life Sciences Education © 2017 The American Society for Cell Biology. This article is distributed by The American Society for Cell Biology under license from the author(s). It is available to the public under an Attribution–Noncommercial–Share Alike 3.0 Unported Creative Commons License (http://creativecommons.org/licenses/by-nc-sa/3.0).

  6. Identifying hidden sexual bridging communities in Chicago.

    PubMed

    Youm, Yoosik; Mackesy-Amiti, Mary Ellen; Williams, Chyvette T; Ouellet, Lawrence J

    2009-07-01

    Bridge populations can play a central role in the spread of human immunodeficiency virus (HIV) by providing transmission links between higher and lower prevalence populations. While social network methods are well suited to the study of bridge populations, analyses tend to focus on dyads (i.e., risk between drug and/or sex partners) and ignore bridges between distinct subpopulations. This study takes initial steps toward moving the analysis of sexual network linkages beyond individual and risk group levels to a community level in which Chicago's 77 community areas are examined as subpopulations for the purpose of identifying potential bridging communities. Of particular interest are "hidden" bridging communities; that is, areas with above-average levels of sexual ties with other areas but whose below-average AIDS prevalence may hide their potential importance for HIV prevention. Data for this analysis came from the first wave of recruiting at the Chicago Sexual Acquisition and Transmission of HIV Cooperative Agreement Program site. Between August 2005 through October 2006, respondent-driven sampling was used to recruit users of heroin, cocaine, or methamphetamine, men who have sex with men regardless of drug use, the sex partners of these two groups, and sex partners of the sex partners. In this cross-sectional study of the sexual transmission of HIV, participants completed a network-focused computer-assisted self-administered interview, which included questions about the geographic locations of sexual contacts with up to six recent partners. Bridging scores for each area were determined using a matrix representing Chicago's 77 community areas and were assessed using two measures: non-redundant ties and flow betweenness. Bridging measures and acquired immunodeficiency syndrome (AIDS) case prevalence rates were plotted for each community area on charts representing four conditions: below-average bridging and AIDS prevalence, below-average bridging and above

  7. Research and development of weathering resistant bridge steel of Shougang

    NASA Astrophysics Data System (ADS)

    Yang, Yongda; Wang, Yanfeng; Huang, Leqing; Di, Guobiao; Ma, Changwen; Ma, Qingshen

    2017-09-01

    To introduce the composition design and mechanical properties and microstructure of the weathering bridge steel which would be used for bridge of Guanting reservoir. We adopt cyclic immersion corrosion test to study corrosion resistance difference of weathering bridge steel and common bridge steel. At the same corrosion time, the weight loss and corrosion rate of weathering bridge steel are lower than the common bridge steel's. Testing phase composition of rust layer by X-ray diffraction, two kinds of test steel's rust layer is mainly composed of Goethite and Fe3O4 and Fe2O3. At the same corrosion time, the percentage composition of goethite in rust layer of weathering bridge steel are significantly higher than common bridge steel's, the higher goethite content is, the compacter rust layer structure is. The compact rust layer would prevent the water and air passing the rust layer, and then preventing the further corrosion reaction, improving the corrosion resistance performance of weathering bridge steel.

  8. A loading study of older highway bridges in Virginia. Pt. 1, Steel truss bridge in Allegheny County.

    DOT National Transportation Integrated Search

    1976-01-01

    A comprehensive field test was conducted on a highway truss bridge in Allegheny County, Virginia, in July 1974. All typical truss members as well as structural members of the bridge floor system were instrumented and unit strains measured when the st...

  9. Aesthetic coatings for concrete bridge components

    NASA Astrophysics Data System (ADS)

    Kriha, Brent R.

    This thesis evaluated the durability and aesthetic performance of coating systems for utilization in concrete bridge applications. The principle objectives of this thesis were: 1) Identify aesthetic coating systems appropriate for concrete bridge applications; 2) Evaluate the performance of the selected systems through a laboratory testing regimen; 3) Develop guidelines for coating selection, surface preparation, and application. A series of site visits to various bridges throughout the State of Wisconsin provided insight into the performance of common coating systems and allowed problematic structural details to be identified. To aid in the selection of appropriate coating systems, questionnaires were distributed to coating manufacturers, bridge contractors, and various DOT offices to identify high performing coating systems and best practices for surface preparation and application. These efforts supplemented a literature review investigating recent publications related to formulation, selection, surface preparation, application, and performance evaluation of coating materials.

  10. 21. View of Clark Fork Vehicle Bridge facing west. Looking ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    21. View of Clark Fork Vehicle Bridge facing west. Looking at bridge deck, guard rail, juncture of two bridge spans. - Clark Fork Vehicle Bridge, Spanning Clark Fork River, serves Highway 200, Clark Fork, Bonner County, ID

  11. Guanidinium-Induced Denaturation by Breaking of Salt Bridges.

    PubMed

    Meuzelaar, Heleen; Panman, Matthijs R; Woutersen, Sander

    2015-12-07

    Despite its wide use as a denaturant, the mechanism by which guanidinium (Gdm(+) ) induces protein unfolding remains largely unclear. Herein, we show evidence that Gdm(+) can induce denaturation by disrupting salt bridges that stabilize the folded conformation. We study the Gdm(+) -induced denaturation of a series of peptides containing Arg/Glu and Lys/Glu salt bridges that either stabilize or destabilize the folded conformation. The peptides containing stabilizing salt bridges are found to be denatured much more efficiently by Gdm(+) than the peptides containing destabilizing salt bridges. Complementary 2D-infrared measurements suggest a denaturation mechanism in which Gdm(+) binds to side-chain carboxylate groups involved in salt bridges. © 2015 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.

  12. Analysis of shielded CPW discontinuities with air-bridges

    NASA Technical Reports Server (NTRS)

    Dib, N. I.; Katehi, P. B.; Ponchak, George E.

    1992-01-01

    The effect of air-bridges on the performance of various coplanar waveguides (CPW) discontinuities is studied. Specifically, the coupled open-end CPW's and the short-end shunt CPW stub discontinuities are considered. The high frequency effect of the air-bridge is evaluated using a hybrid technique. At first, the frequency dependent equivalent circuit of the planar discontinuity without the air-bridge is derived using the Space Domain Integral Equation (SDIE) method. Then, the circuit is modified by incorporating the air-bridge's parasitic inductance and capacitance which are evaluated using a simple quasi-static model. The frequency response of each discontinuity with and without the air-bridge is studied and the scattering parameters are plotted in the frequency range 30-50 GHz for typical CPW dimensions.

  13. Instability of the capillary bridge

    NASA Astrophysics Data System (ADS)

    Pare, Gounseti; Hoepffner, Jerome

    2014-11-01

    Capillary adhesion is a physical mechanism that maintains two bodies in contact by capillarity through a liquid ligament. The capillary bridge is an idealization of this capillary adhesion. In this study we first focus on the classical case of the stability of the capillary bridge. Secondly we study a slightly more complex configuration, imagining a flow in the capillary bridge as in the case of the dynamics of the neck of a liquid ligament, in its withdrawal under the effect of capillarity. Inspired by the experiments on soap films of Plateau, the configuration analyzed consists of an initially axisymmetric, mass of fluid held by surface tension forces between two parallel, coaxial, solid pipes of the same diameter. The results presented are obtained by numerical simulations using the free software, Gerris Flow Solver. We first focus on the capillary Venturi. In the static configuration the stability diagram of the capillary bridge obtained is in perfect agreement with the results of Lev A. Slobozhanin. In the dynamic case we develop a matlab code based on the one dimensional equations of Eggers and Dupont. The comparison of the bifurcation diagram obtained and the numerical simulations shows a good agreement.

  14. Performance of portland limestone cements : cements designed to be more sustainable that include up to 15% limestone addition.

    DOT National Transportation Integrated Search

    2013-11-01

    In 2009, ASTM and AASHTO permitted the use of up to 5% interground limestone in ordinary portland cement (OPC) as a part of ASTM : C150/AASHTO M85. When this project was initiated a new proposal was being discussed that would enable up to 15% intergr...

  15. Effect of voids in grouted post-tensioned concrete bridge construction : inspection and repair manual for external tendons in segmental, post-tensioned bridges.

    DOT National Transportation Integrated Search

    2009-11-01

    Segmental, post-tensioned (PT) bridges are major structures that carry significant traffic. These bridges are designed and constructed because they are economical for spanning long distances. In Texas, there are several signature PT bridges. In the l...

  16. 1. VIEW OF SOUTH ELEVATION OF NOTRE DANE BRIDGE, SHOWING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. VIEW OF SOUTH ELEVATION OF NOTRE DANE BRIDGE, SHOWING CAUSEWAY, STEEL ARCH, AND EASTBOUND LANE OF NEW BRIDGE UNDER CONSTRUCTION, PARALLELING CAUSEWAY, LOOKING NORTHWEST - Notre Dame Bridge, Spanning Merrimack River on Bridge Street, Manchester, Hillsborough County, NH

  17. GOOD HEALTH AND THE BRIDGING OF STRUCTURAL HOLES

    PubMed Central

    Cornwell, Benjamin

    2009-01-01

    Bridges that span structural holes are often explained in terms of the entrepreneurial personalities or rational motivations of brokers, or structural processes that lead to the intersection of social foci. I argue that the existence and use of bridges in interpersonal networks also depends on individuals’ health. Poor health may make it more difficult to withstand the pressures and to execute some of the common tasks associated with bridging (e.g., brokerage). I examine this possibility using egocentric network data on over 2,500 older adults drawn from the recent National Social Life, Health, and Aging Project (NSHAP). Multivariate regression analyses show that both cognitive and functional health are significantly positively associated with bridging, net of sociodemographic and life-course controls. The relationship between functional (kinesthetic) health and bridging appears to be partially mediated by network composition, as older adults who have poorer functional health also tend to have networks that are richer in strong ties. Several potential mediation mechanisms are discussed. Cognitive function remains significantly associated with bridging net of network composition, suggesting that the inherent challenges of maintaining bridging positions may be more difficult to cope with for those who have cognitive impairments than for those who have functional impairments such as limited mobility. An alternative explanation is that cognitively impaired individuals have more difficulty recognizing (and thus strategically using) bridges in their networks. Theoretical implications and possibilities for future research are discussed. PMID:20046998

  18. 28. Under ninth bridge, view to concrete dam and eighth ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    28. Under ninth bridge, view to concrete dam and eighth bridge in background during heavy rain, view to the SW. - Vicksburg National Military Park Roads & Bridges, Melan Arch Bridges, Spanning various tributaries at Confederate Avenue, Vicksburg, Warren County, MS

  19. Random vibration analysis of train-bridge under track irregularities and traveling seismic waves using train-slab track-bridge interaction model

    NASA Astrophysics Data System (ADS)

    Zeng, Zhi-Ping; Zhao, Yan-Gang; Xu, Wen-Tao; Yu, Zhi-Wu; Chen, Ling-Kun; Lou, Ping

    2015-04-01

    The frequent use of bridges in high-speed railway lines greatly increases the probability that trains are running on bridges when earthquakes occur. This paper investigates the random vibrations of a high-speed train traversing a slab track on a continuous girder bridge subjected to track irregularities and traveling seismic waves by the pseudo-excitation method (PEM). To derive the equations of motion of the train-slab track-bridge interaction system, the multibody dynamics and finite element method models are used for the train and the track and bridge, respectively. By assuming track irregularities to be fully coherent random excitations with time lags between different wheels and seismic accelerations to be uniformly modulated, non-stationary random excitations with time lags between different foundations, the random load vectors of the equations of motion are transformed into a series of deterministic pseudo-excitations based on PEM and the wheel-rail contact relationship. A computer code is developed to obtain the time-dependent random responses of the entire system. As a case study, the random vibration characteristics of an ICE-3 high-speed train traversing a seven-span continuous girder bridge simultaneously excited by track irregularities and traveling seismic waves are analyzed. The influence of train speed and seismic wave propagation velocity on the random vibration characteristics of the bridge and train are discussed.

  20. Wearing surface testing : Yukon River bridge.

    DOT National Transportation Integrated Search

    2012-12-01

    The Yukon River Bridge, also known as the E.L. Patton Bridge, carries the twolane Dalton Highway and the trans-Alaska oil pipeline across the Yukon River at a 6% : grade. It is 30 feet wide, with 6 spans; it was designed to withstand -60 degrees Fahr...