Science.gov

Sample records for abatement program plan

  1. Oak Ridge Y-12 Plant biological monitoring and abatement program (BMAP) plan

    SciTech Connect

    Adams, S.M.; Brandt, C.C.; Cicerone, D.S.

    1998-02-01

    The proposed Biological Monitoring and Abatement Program (BMAP) for East Fork Poplar Creek (EFPC) at the Oak Ridge Y-12 Plant, as described, will be conducted for the duration of the National Pollutant Discharge Elimination System permit issued for the Y-12 Plant on April 28, 1995, and which became effective July 1, 1995. The basic approach to biological monitoring used in this program was developed by the staff in the Environmental Sciences Division at the Oak Ridge National Laboratory at the request of Y-12 Plant personnel. The proposed BMAP plan is based on results of biological monitoring conducted since 1985. Details of the specific procedures used in the current routine monitoring program are provided, but experimental designs for future studies are described in less detail. The overall strategy used in developing this plan was, and continues to be, to use the results obtained from each task to define the scope of future monitoring efforts. Such efforts may require more intensive sampling than initially proposed in some areas or a reduction in sampling intensity in others. By using the results of previous monitoring efforts to define the current program and to guide them in the development of future studies, an effective integrated monitoring program has been developed to assess the impacts of the Y-12 Plant operation on the biota of EFPC and to document the ecological effects of remedial actions.

  2. Oak Ridge Y-12 Plant Biological Monitoring and Abatement Program Plan

    SciTech Connect

    Adams, S.M.; Brandt, C.C.; Christensen, S.W.; Greeley, M.S.JR.; Hill, W.R.; Peterson, M.J.; Ryon, M.G.; Smith, J.G.; Southworth, G.R.; Stewart, A.J.

    2000-09-01

    The revised Biological Monitoring and Abatement Program (BMAP) for East Fork Poplar Creek (EFPC) at the Oak Ridge Y-12 Plant, as described, will be conducted as required by the National Pollutant Discharge Elimination System permit issued for the Y-12 Plant on April 28, 1995 and became effective July 1, 1995. The basic approach to biological monitoring used in this program was developed by the staff in the Environmental Science Division (ESD) at the Oak Ridge National Laboratory (ORNL) at the request of the Y-12 Plant. The revision to the BMAP plan is based on results of biological monitoring conducted during the period of 1985 to present. Details of the specific procedures used in the current routine monitoring program are provided; experimental designs for future studies are described in less detail. The overall strategy used in developing this plan was, and continues to be, to use the results obtained from each task to define the scope of future monitoring efforts. Such efforts may require more intensive sampling than initially proposed in some areas (e.g., additional bioaccumulation monitoring if results indicate unexpectedly high PCBs or Hg) or a reduction in sampling intensity in others (e.g., reduction in the number of sampling sites when no impact is still observed). The program scope will be re-evaluated annually. By using the results of previous monitoring efforts to define the current program and to guide us in the development of future studies, an effective integrated monitoring program has been developed to assess the impacts of Y-12 Plant operations (past and present) on the biota of EFPC and to document the ecological effects of remedial actions.

  3. OAK RIDGE Y-12 PLANT BIOLOGICAL MONITORING AND ABATEMENT PROGRAM (BMAP) PLAN

    SciTech Connect

    ADAMS, S.M.; BRANDT, C.C.; CHRISTENSEN, S.W.; CICERONE, D.S.; GREELEY, M.S.JR; HILL, W.R.; HUSTON, M.S.; KSZOS, L.A.; MCCARTHY, J.F.; PETERSON, M.J.; RYON, M.G.; SMITH, J.G.; SOUTHWORTH, G.R.; STEWART, A.J.

    1998-10-01

    The proposed Biological Monitoring and Abatement Program (BMAP) for East Fork Poplar Creek (EFPC) at the Oak Ridge Y-12 Plant, as described, will be conducted for the duration of the National Pollutant Discharge Elimination System permit issued for the Y-12 Plant on April 28, 1995, and which became effective July 1, 1995. The basic approach to biological monitoring used in this program was developed by the staff in the Environmental Sciences Division at the Oak Ridge National Laboratory at the request of Y- 12 Plant personnel. The proposed BMAP plan is based on results of biological monitoring conducted since 1985. Details of the specific procedures used in the current routine monitoring program are provided but experimental designs for future studies are described in less detail. The overall strategy used in developing this plan was, and continues to be, to use the results obtained from each task to define the scope of future monitoring efforts. Such efforts may require more intensive sampling than initially proposed in some areas (e.g., additional toxicity testing if initial results indicate low survival or reproduction) or a reduction in sampling intensity in others (e.g., reduction in the number of sampling sites when no impact is observed). By using the results of previous monitoring efforts to define the current program and to guide us in the development of future studies, an effective integrated monitoring program has been developed to assess the impacts of the Y-12 Plant operation on the biota of EFPC and to document the ecological effects of remedial actions.

  4. Hanford Site Asbestos Abatement Plan. Revision 1

    SciTech Connect

    Mewes, B.S.

    1993-09-01

    The Hanford Site Asbestos Abatement Plan (Plan) lists priorities for asbestos abatement activities to be conducted in Hanford Site facilities. The Plan is based on asbestos assessment information gathered in fiscal year 1989 that evaluated all Hanford Site facilities for the presence and condition of asbestos. Of those facilities evaluated, 414 contain asbestos-containing materials and are classified according to the potential risk of asbestos exposure to building personnel. The Plan requires that asbestos condition update reports be prepared for all affected facilities. The reporting is completed by the asbestos coordinator for each of the 414 affected facilities and transmitted to the Plan manager annually. The Plan manager uses this information to reprioritize future project lists. Currently, five facilities are determined to be Class Al, indicating a high potential for asbestos exposure. Class Al and B1 facilities are the highest priority for asbestos abatement. Abatement of the Class A1 and Bl facilities is scheduled through fiscal year 1997. Removal of asbestos in B1 facilities will reduce the risk for further Class ``A`` conditions to arise.

  5. Biological monitoring and abatement program plan for Oak Ridge National Laboratory

    SciTech Connect

    Kszos, L.A.; Anderson, G.E.; Gregory, S.M.; Peterson, M.J.; Ryon, M.G.; Schilling, E.M.; Smith, J.G.; Southworth, G.R.; Phipps, T.L.

    1997-06-01

    The overall purpose of this plan is to evaluate the receiving streams` biological communities for the duration of the permit and meet the objectives for the ORNL BMAP as outlined in the NPDES permit (Appendix). The ORNL BMAP will focus on those streams in the WOC watershed that (1) receive NPDES discharges and (2) have been identified as ecologically impacted. In response to the newly issued NPDES permit, the tasks that are included in this BMAP plan include monitoring biological communities (fish and benthic invertebrates), monitoring mercury contamination in fish and water, monitoring polychlorinated biphenyl (PCB) contamination in fish, and evaluating temperature loading from ORNL outfalls. The ORNL BMAP will evaluate the effects of sediment and oil and grease, as well as the chlorine control strategy through the use of biological community data. Monitoring will be conducted at sites in WOC, First Creek, Fifth Creek, Melton Branch, and WOL.

  6. 29 CFR 4207.10 - Plan rules for abatement.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... partial withdrawals after a reduction or waiver of complete withdrawal liability under a plan amendment... 29 Labor 9 2010-07-01 2010-07-01 false Plan rules for abatement. 4207.10 Section 4207.10 Labor... MULTIEMPLOYER PLANS REDUCTION OR WAIVER OF COMPLETE WITHDRAWAL LIABILITY § 4207.10 Plan rules for abatement....

  7. The Veterans Administration's Asbestos Abatement Program

    SciTech Connect

    Schepers, G.W. )

    1991-12-31

    The Veterans Administration has developed a program of asbestos abatement for its more than 1000 buildings, where health care personnel from 173 hospitals and 238 ambulatory care clinics are likely to encounter respirable asbestos. This is a costly program, which has averaged about $25 million annually for the past ten years. The VA has banned the use of new asbestos products containing more than 1% of asbestos in building construction or renovation projects. Industrial hygiene engineering programs have been ordered instituted at all VA medical centers to monitor dust levels in compliance with OSHA and EPA requirements. Health surveillance programs, managed by an environmental health physician at each medical center, have been instituted for all personnel who have been identified to have breathed asbestos fibers in excess of OSHA-EPA threshold limit values. The health care program focuses on the identification of asbestosis and asbestos-related cancer through periodic X-ray films, lung function tests, and electrocardiographic and physical examination screening. The program also stresses cessation of smoking.

  8. 29 CFR 4207.10 - Plan rules for abatement.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 9 2012-07-01 2012-07-01 false Plan rules for abatement. 4207.10 Section 4207.10 Labor Regulations Relating to Labor (Continued) PENSION BENEFIT GUARANTY CORPORATION WITHDRAWAL LIABILITY FOR... representative acting on behalf of the plan sponsor, shall sign and submit the request. (c) Where to file....

  9. 29 CFR 4207.10 - Plan rules for abatement.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 9 2013-07-01 2013-07-01 false Plan rules for abatement. 4207.10 Section 4207.10 Labor Regulations Relating to Labor (Continued) PENSION BENEFIT GUARANTY CORPORATION WITHDRAWAL LIABILITY FOR... representative acting on behalf of the plan sponsor, shall sign and submit the request. (c) Where to file....

  10. Environmental projects. Volume 1: Polychlorinated biphenyl (PCB) abatement program

    NASA Technical Reports Server (NTRS)

    Kushner, L.

    1987-01-01

    Six large parabolic dish antennas are located at the Goldstone Deep Space Communications Complex north of Barstow, California. Some of the ancillary electrical equipment of thes Deep Space Stations, particularly transformers and power capicitors, were filled with stable, fire-retardant, dielectric fluids containing substances called polychlorobiphenyls (PCBs). Because the Environmental Protection Agency has determined that PCBs are environmental pollutants toxic to humans, all NASA centers have been asked to participate in a PCB-abatement program. Under the supervision of JPL's Office of Telecommunications and Data Acquisition, a two-year long PCB-abatement program has eliminated PCBs from the Goldstone Complex.

  11. 29 CFR 4208.9 - Plan adoption of additional abatement conditions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 9 2012-07-01 2012-07-01 false Plan adoption of additional abatement conditions. 4208.9... Plan adoption of additional abatement conditions. (a) General rule. A plan may by amendment, subject to... actuarial valuation report of the plan. (5) A statement certifying that notice of the adoption of the...

  12. 29 CFR 4208.9 - Plan adoption of additional abatement conditions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 9 2014-07-01 2014-07-01 false Plan adoption of additional abatement conditions. 4208.9... Plan adoption of additional abatement conditions. (a) General rule. A plan may by amendment, subject to... actuarial valuation report of the plan. (5) A statement certifying that notice of the adoption of the...

  13. 29 CFR 4208.9 - Plan adoption of additional abatement conditions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 9 2013-07-01 2013-07-01 false Plan adoption of additional abatement conditions. 4208.9... Plan adoption of additional abatement conditions. (a) General rule. A plan may by amendment, subject to... actuarial valuation report of the plan. (5) A statement certifying that notice of the adoption of the...

  14. 29 CFR 4208.9 - Plan adoption of additional abatement conditions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 9 2011-07-01 2011-07-01 false Plan adoption of additional abatement conditions. 4208.9... Plan adoption of additional abatement conditions. (a) General rule. A plan may by amendment, subject to... actuarial valuation report of the plan. (5) A statement certifying that notice of the adoption of the...

  15. 29 CFR 4208.9 - Plan adoption of additional abatement conditions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Plan adoption of additional abatement conditions. 4208.9... Plan adoption of additional abatement conditions. (a) General rule. A plan may by amendment, subject to... actuarial valuation report of the plan. (5) A statement certifying that notice of the adoption of the...

  16. Introduction to the biological monitoring and abatement program.

    PubMed

    Peterson, Mark J

    2011-06-01

    This paper provides an introduction to a long-term biological monitoring program and the Environmental Management special issue titled Long-term Biological Monitoring of an Impaired Stream: Implications for Environmental Management. The Biological Monitoring and Abatement Program, or BMAP, was implemented to assess biological impairment downstream of U.S. Department of Energy (DOE) facilities in Oak Ridge, Tennessee, beginning in 1985. Several of the unique aspects of the program include its long-term consistent sampling, a focus on evaluating the effectiveness of specific facility abatement and remedial actions, and the use of quantitative sampling protocols using a multidisciplinary approach. This paper describes the need and importance of long-term watershed-based biological monitoring strategies, in particular for addressing long-term stewardship goals at DOE sites, and provides a summary of the BMAP's objectives, spatial and temporal extent, and overall focus. The primary components of the biological monitoring program for East Fork Poplar Creek in Oak Ridge, Tennessee are introduced, as are the additional 9 papers in this Environmental Management special issue.

  17. The schoolroom asbestos abatement program: a public policy debacle

    NASA Astrophysics Data System (ADS)

    Ross, M.

    1995-10-01

    It is estimated that nearly 100 billion has been spent on removal of asbestos-bearing materials from schoolrooms, public and commercial buildings, and homes. This removal continues to this day despite the publication of an advisory document in 1990 by the US Environmental Protection Agency that states most removal is unnecessary and is even counterproductive both in terms health protection and costs. Concern over low exposure to substances that are designated as carcinogens is based on the false concept that even the smallest exposure to such substances can increase cancer risk. The expression “one molecule of a chemical or one asbestos fiber can possibly produce a tumor” is repeated over and over until it is accepted as a truth. Over 1400 air samples taken in 219 North American school buildings show the average fiber level to be 0.00022 fibers per milliliter of air. Using the most pessimistic models and attendance in the school for 6 h a day, five days a week, for 14 years, the calculated risk is one excess cancer death per million lifetimes. In contrast, the risk of dying from a lightning strike is 35 deaths per million lifetimes. Ambient air asbestos concentrations measured in the chrysotile asbestos mining towns of Quebec are 220 to 2200 times greater than that measured in the average schoolroom, yet the women living their entire lives in these towns show no increased cancer risk. The asbestos abatement program in the United States is a public policy debacle.

  18. Oak Ridge National Laboratory Biological Monitoring and Abatement Program for White Oak Creek Watershed and the Clinch River

    SciTech Connect

    Loar, J.M.; Adams, S.M.; Allison, L.J.; Blaylock, B.G.; Boston, H.L.; Huston, M.A.; Kimmel, B.L.; Smith, J.G.; Southworth, G.R.; Stewart, A.J.; Walton, B.T.; Kitchings, J.T.; Olsen, C.R.

    1991-09-01

    On April 1, 1986, a National Pollutant Discharge Elimination System (NPDES) permit was issued for the Oak Ridge National Laboratory (ORNL) (EPA 1986). As specified in Part 3: Special Conditions (Item H) of the permit, a plan for biological monitoring of the Clinch River, White Oak Creek (WOC), Northwest Tributary (NWT) of WOC, Melton Branch (MB), Fifth Creek, and First Creek shall be submitted for approval to the US Environmental Protection Agency (EPA) and the Tennessee Department of Health and Environment (TDHE) within 90 days of the effective date of the permit. The plan, which is referred to in Part 3 (H) of the permit as the Biological Monitoring Plan and Abatement Program (BMPAP), describes characterization monitoring studies to be conducted for the duration of the permit (5 years). In order to be consistent with the terminology used for the Biological Monitoring and Abatement Programs for the Oak Ridge Y-12 Plan and the Oak Ridge K-25 Plant, BMPAP will subsequently be referred to as the Biological Monitoring and Abatement Program (BMAP). The proposed BMAP outlined in this document is based on preliminary discussions held on December 9, 1985, between staff of Martin Marietta Energy Systems, Inc. (ORNL and Central Management), the US Department of Energy (DOE), EPA, and TDHE. 232 refs., 11 figs., 7 tabs.

  19. Abatement and Pollution Control Training and Educational Programs Presented by the United States Environmental Protection Agency.

    ERIC Educational Resources Information Center

    Environmental Protection Agency, Washington, DC.

    This catalog is a compilation of training course and educational program descriptions in abatement and pollution control scheduled by the Environmental Protection Agency. Descriptions of programs include prerequisites, class size, and length of time with the content goals. Also given is general information concerning tuition fees, waiver requests,…

  20. Abatement and Pollution Control Training and Educational Programs Presented by the United States Environmental Protection Agency.

    ERIC Educational Resources Information Center

    Environmental Protection Agency, Washington, DC.

    This catalog is a compilation of training course and educational program descriptions in abatement and pollution control scheduled by the Environmental Protection Agency. Descriptions of programs include prerequisites, class size, and length of time with the content goals. Also given is general information concerning tuition fees, waiver requests,…

  1. Biological Monitoring and Abatement Program for the Oak Ridge K-25 Site

    SciTech Connect

    Kszos, L.A.; Adams, S.M.; Ashwood, T.L.; Blaylock, B.G.; Greeley, M.S.; Loar, J.M.; Peterson, M.J.; Ryon, M.G.; Smith, J.G.; Southworth, G.R.; Hinzman, R.L.; Shoemaker, B.A.

    1993-04-01

    A proposed Biological Monitoring and Abatement Program (BMAP) for the Oak Ridge K-25 Site was prepared in December 1992 as required by the renewed National Pollutant Discharge Elimination System permit that was issued on October 1, 1992. The proposed BMAP is based on results of biological monitoring conducted from 1986 to 1992 and discussions held on November 12, 1992, between staff of Martin Marietta Energy Systems, Inc. (Oak Ridge National Laboratory and the K-25 Site), and the Tennessee Department of Environment and Conservation, Department of Energy Oversight Division. The proposed BMAP consists of four tasks that reflect different but complementary approaches to evaluating the effects of K-25 Site effluents on the ecological integrity of Mitchell Branch, Poplar Creek, and the Poplar Creek embayment of the Clinch River. These tasks include (1) ambient toxicity monitoring, (2) bioaccumulation monitoring, (3) assessment of fish health, and (4) instream monitoring of biological communities. This overall BMAP plan combines established protocols with current biological monitoring techniques to assess environmental compliance and quantify ecological recovery. The BMAP will also determine whether the effluent limits established for the K-25 Site protect the designated use of the receiving streams (Mitchell Branch, Poplar Creek, and Clinch River) for growth and propagation of fish and other aquatic life. Results obtained from this biological monitoring program will also be used to document the ecological effects (and effectiveness) of remedial actions.

  2. Biological Monitoring and Abatement Program for the Oak Ridge K-25 Site

    SciTech Connect

    Kszos, L. A.; Adams, S. M.; Ashwood, T. L.; Blaylock, B. G.; Greeley, M. S.; Loar, J. M.; Peterson, M. J.; Ryon, M. G.; Smith, J. G.; Southworth, G. R.; Shoemaker, B. A.; Hinzman, R. L.

    1993-02-01

    A proposed Biological Monitoring and Abatement Program (BMAP) for the Oak Ridge K-25 Site was prepared in December 1992 as required by the renewed National Pollutant Discharge Elimination System permit that was issued on October 1, 1992. The proposed BMAP consists of four tasks that reflect different but complementary approaches to evaluating the effects of K-25 Site effluents on the ecological integrity of Mitchell Branch, Poplar Creek, and the Poplar Creek embayment of the Clinch River. These tasks include (1) ambient toxicity monitoring, (2) bioaccumulation monitoring, (3) assessment of fish health, and (4) instream monitoring of biological communities. This overall BMAP plan combines established protocols with current biological monitoring techniques to assess environmental compliance and quantify ecological recovery. The BMAP will also determine whether the effluent limits established for the K-25 Site protect the designated use of the receiving streams (Mitchell Branch, Poplar Creek, and Clinch River) for growth and propagation of fish and other aquatic life. Results obtained from this biological monitoring program will also be used to document the ecological effects (and effectiveness) of remedial actions.

  3. The hydrogen sulfide emissions abatement program at the Geysers Geothermal Power Plant

    NASA Technical Reports Server (NTRS)

    Allen, G. W.; Mccluer, H. K.

    1974-01-01

    The scope of the hydrogen sulfide (H2S) abatement program at The Geysers Geothermal Power Plant and the measures currently under way to reduce these emissions are discussed. The Geysers steam averages 223 ppm H2S by weight and after passing through the turbines leaves the plant both through the gas ejector system and by air-stripping in the cooling towers. The sulfide dissolved in the cooling water is controlled by the use of an oxidation catalyst such as an iron salt. The H2S in the low Btu ejector off gases may be burned to sulfur dioxide and scrubbed directly into the circulating water and reinjected into the steam field with the excess condensate. Details are included concerning the disposal of the impure sulfur, design requirements for retrofitting existing plants and modified plant operating procedures. Discussion of future research aimed at improving the H2S abatement system is also included.

  4. Oak Ridge Gaseous Diffusion Plant Biological Monitoring and Abatement Program for Mitchell Branch

    SciTech Connect

    Loar, J.M.; Adams, S.M.; Kszos, L.A.; Ryon, M.G.; Smith, J.G.; Southworth, G.R.; Stewart, A.J.

    1992-01-01

    A proposed Biological Monitoring and Abatement Program (BMAP) for the Oak Ridge Gaseous Diffusion Plant (ORGDP; currently the Oak Ridge K-25 Site) was prepared in December 1986, as required by the modified National Pollutant Discharge Elimination System (NPDES) permit that was issued on September 11, 1986. The effluent discharges to Mitchell Branch are complex, consisting of trace elements, organic chemicals, and radionuclides in addition to various conventional pollutants. Moreover, the composition of these effluent streams will be changing over time as various pollution abatement measures are implemented over the next several years. Although contaminant inputs to the stream originate primarily as point sources from existing plant operations, area sources, such as the classified burial grounds and the K-1407-C holding pond, can not be eliminated as potential sources of contaminants. The proposed BMAP consists of four tasks. These tasks include (1) ambient toxicity testing, (2) bioaccumulation studies, (3) biological indicator studies, and (4) ecological surveys of the benthic invertebrate and fish communities. BMAP will determine whether the effluent limits established for ORGDP protect the designated use of the receiving stream (Mitchell Branch) for growth and propagation of fish and aquatic life. Another objective of the program is to document the ecological effects resulting from various pollution abatement projects, such as the Central Neutralization Facility.

  5. Second report on the Oak Ridge K-25 Site Biological Monitoring and Abatement Program for Mitchell Branch

    SciTech Connect

    Smith, J.G.; Adams, S.M.; Hinzman, R.L.; Kszos, L.A.; Loar, J.M.; Peterson, M.J.; Ryon, M.G.; Southworth, G.R.; Crumby, W.D.

    1994-03-01

    On September 11, 1986, a modified National Pollutant Discharge Elimination System permit was issued for the Oak Ridge Gaseous Diffusion Plant (ORGDP; now referred to as the Oak Ridge K-25 Site), a former uranium-enrichment production facility. As required in Part III of the permit, a Biological Monitoring and Abatement Program (BMAP) was developed for the biological monitoring of Mitchell Branch (K-1700 stream) and submitted for approval to the US EPA and the Tennessee Department of Environment and Conservation. The plan described biomonitoring activities that would be conducted over the duration of the permit. The objectives of the BMAP are to demonstrate that the effluent limitations established for the Oak Ridge K-25 Site protect and maintain the use of Mitchell Branch for growth and propagation of fish and other aquatic life, and to document the effects on stream biota resulting from operation of major new pollution abatement facilities. The BMAP consists of four tasks: ambient toxicity testing; bioaccumulation studies; biological indicator studies; and ecological surveys of stream communities, including benthic macroinvertebrates and fish. This document is the second in a series of reports presenting the results of the studies that were conducted over various periods of time between August 1987 and June 1990.

  6. Third report on the Oak Ridge K-25 Site Biological Monitoring and Abatement Program for Mitchell Branch

    SciTech Connect

    Hinzman, R.L.; Adams, S.M.; Ashwood, T.L.

    1995-08-01

    As a condition of the modified National Pollutant Discharge Elimination System (NPDES) permit issued to the Oak Ridge Gaseous Diffusion Plant (ORGDP; now referred to as the Oak Ridge K-25 Site) on September 11, 1986, a Biological Monitoring and Abatement Program (BMAP) was developed for the receiving stream (Mitchell Branch or K-1700 stream). On October 1, 1992, a renewed NPDES permit was issued for the K-25 Site. A biological monitoring plan was submitted for Mitchell Branch, Poplar Creek, Poplar Creek Embayment of the Clinch River and any unnamed tributaries of these streams. The objectives of BMAP are to (1) demonstrate that the effluent limitations established for the Oak Ridge K-25 Site protect and maintain the use of Mitchell Branch for growth and propagation of fish and other aquatic life and (2) document the effects on stream biota resulting from operation of major new pollution abatement facilities, including the Central Neutralization Facility (CNF) and the Toxic Substances Control Act (TSCA) incinerator. The BMAP consists of four tasks: (1) toxicity monitoring; (2) bioaccumulation monitoring; (3) assessment of fish health; and (4) instream monitoring of biological communities, including benthic macroinvertebrates and fish. This document, the third in a series, reports on the results of the Oak Ridge K-25 Site BMAP; it describes studies that were conducted over various periods of time between June 1990 and December 1993, although monitoring conducted outside this time period is included, as appropriate.

  7. Public Education as an Approach to Future Planning for Pollution Abatement.

    ERIC Educational Resources Information Center

    Hammer, Eliot R.

    One approach to the abatement of pollution is that which stresses that an informed public will, because of an altruistic motive termed "civic responsibility," control the disruption of the environment, before such disruption reaches a perceived 'crisis' state. This paper discusses the public approach to pollution abatement in terms of long-range…

  8. The Oak Ridge Y-12 Plant biological monitoring and abatement program for East Fork Poplar Creek

    SciTech Connect

    Loar, J.M.; Adams, S.M.; Allison, L.J.; Giddings, J.M.; McCarthy, J.F.; Southworth, G.R.; Smith, J.G.; Stewart, A.J.; Springborn Bionomics, Inc., Wareham, MA; Oak Ridge National Lab., TN )

    1989-10-01

    In May 1985, a National Pollutant Discharge Elimination System permit was issued for the Oak Ridge Y-12 Plant, a nuclear weapons components production facility located in Oak Ridge, Tennessee, and operated by Martin Marietta Energy Systems, Inc., for the US Department of Energy. As a condition of the permit, a Biological Monitoring and Abatement Program (BMAP) was developed to demonstrate that the effluent limitations established for the Oak Ridge Y-12 Plant protect the classified uses of the receiving stream (East Fork Poplar Creek), in particular, the growth and propagation of fish and aquatic life, as designated by the Tennessee Department of Health and Environment. A second purpose for the BMAP is to document the ecological effects resulting from implementation of a water pollution control program that will include construction of nine new wastewater treatment facilities over the next 4 years. Because of the complex nature of the effluent discharged to East Fork Poplar Creek and the temporal and spatial variability in the composition of the effluent (i.e., temporal variability related to various pollution abatement measures that will be implemented over the next several years and spatial variability caused by pollutant inputs downstream of the Oak Ridge Y-12 Plant), a comprehensive, integrated approach to biological monitoring was developed for the BMAP. 39 refs., 5 figs., 8 tabs.

  9. 29 CFR 1960.30 - Abatement of unsafe or unhealthful working conditions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) BASIC PROGRAM ELEMENTS FOR FEDERAL EMPLOYEE OCCUPATIONAL SAFETY.... Any changes in an abatement plan will require the preparation of a new plan in accordance with...

  10. First report on the Oak Ridge K-25 Site Biological Monitoring and Abatement Program for Mitchell Branch

    SciTech Connect

    Smith, J.G.; Adams, S.M.; Kszos, L.A.; Ryon, M.G.; Southworth, G.R.; Loar, J.M.

    1993-08-01

    A modified National Pollutant Discharge Elimination System permit was issued to the Oak Ridge Gaseous Diffusion Plant (now referred to as the Oak Ridge K-25 Site) on September 11, 1986. The Oak Ridge K-25 Site is a former uranium-enrichment production facility, which is currently managed by Martin Marietta Energy Systems, Inc. for the US Department of Energy. As required in Part III (L) of that permit, a plan for the biological monitoring of Mitchell Branch (K-1700 stream) was prepared and submitted for approval to the US Environmental Protection Agency and the Tennessee Department of Environment and Conservation [formerly the Tennessee Department of Health and Environment (Loar et al. 1992b)]. The K-25 Site Biological Monitoring and Abatement Program (BMAP) described biomonitoring activities that would be conducted over the duration of the permit. Because it was anticipated that the composition of existing effluent streams entering Mitchell Branch would be altered shortly after the modified permit was issued, sampling of the benthic invertebrate and fish communities (Task 4 of BMAP) was initiated in August and September 1986 respectively.

  11. First annual report on the Biological Monitoring and Abatement Program at Oak Ridge National Laboratory

    SciTech Connect

    Loar, J. M.; Adams, S. M.; Blaylock, B. G.; Boston, H. L.; Frank, M. L.; Garten, C. T.; Houston, M. A.; Kimmel, B. L.; Ryon, M. G.; Smith, J. G.; Southworth, G. R.; Stewart, A. J.; Walton, B. T.; Berry, J. B.; Talmage, S. S.; Amano, H.; Jimenez, B. D.; Kitchings, J. T.; Meyers-Schoene, L.; Mohrbacher, D. A.; Olsen, C. R.

    1992-08-01

    As a condition of the National Pollutant Discharge Elimination System (NPDES) permit issued to Oak Ridge National Laboratory (ORNL) on April 1, 1986, a Biological Monitoring and Abatement Program (BMAP) was developed for White Oak Creek (WOC); selected tributaries of WOC, including Fifth Creek, First Creek, Melton Branch, and Northwest Tributary; and the Clinch River. BMAP consists of seven major tasks that address both radiological and nonradiological contaminants in the aquatic and terrestrial environs on-site and the aquatic environs off-site. These tasks are (1) toxicity monitoring; (2) bioaccumulation monitoring of nonradiological contaminants in aquatic biota; (3) biological indicator studies; (4) instream ecological monitoring; (5) assessment of contaminants in the terrestrial environment; (6) radioecology of WOC and White Oak Lake (WOL); and (7) contaminant transport, distribution, and fate in the WOC embayment-Clinch River-Watts Bar Reservoir system. This document, the first of a series of annual reports presenting the results of BMAP, describes studies that were conducted from March through December 1986.

  12. Effective family planning programs.

    PubMed

    Rosenfield, A G

    1973-01-01

    Organizational and content features of various national family planning programs are reviewed. The Thai program is cited as an example of a family planning program organized on a massive unipurpose compaign basis. The Korean and Taiwan programs have utilized special field workers while upgrading the general health care network. 3 major problems with family planning programs are: 1) the lack of experience with such programs; 2) lack of commitment at the highest political levels; and 3) medical conservatism. Utilization of all available contraceptive methods instead of reliance on 1 method would improve most programs. Nursing and auxiliary personnel could be trained to take over the work of physicians in family planning programs. This is already being done with IUD insertion and pill prescription in several programs. The postpartum tubal ligation approach has proven effective and should be extended. There is a place in all national programs for both the private and the commercial sectors. Incentives for clinics, personnel, and acceptors might spread family planning more rapidly.

  13. Programs for skyline planning.

    Treesearch

    Ward W. Carson

    1975-01-01

    This paper describes four computer programs for the logging engineer's use in planning log harvesting by skyline systems. One program prepares terrain profile plots from maps mounted on a digitizer; the other programs prepare load-carrying capability and other information for single and multispan standing skylines and single span running skylines. In general, the...

  14. Development of the five-year air pollution abatement plan for the greater Athens area

    SciTech Connect

    Economopoulos, A.P.

    1987-08-01

    For the abatement of the air pollution problem of the greater Athens area a systematic study was carried out in the past three and a half years comprising rapid source inventories for the identification of the problem and prioritization of the follow-up analysis, detailed sectorial technoeconomic studies for assessing the efficiency and cost of the control alternatives, formulation of optimum strategies using state-of-the-art models, and implementation through the development of infrastructure, enforcement schemes and legislation. Rigorous optimization demonstrated that the best target for the year 1990 is a 27% weighted average reduction in the emissions achieved through industrial emission controls, maintenance and inspection of vehicles and space heating furnaces, and introduction of LPG-powered/catalyst-equipped taxis. Moreover, gradual promotion of gasoline-powered cars using low-emission technologies allows a 60% weighted average reduction of emissions by the year 2000.

  15. Randomized Trial of a Delirium Abatement Program for Post-acute Skilled Nursing Facilities

    PubMed Central

    Marcantonio, Edward R.; Bergmann, Margaret A.; Kiely, Dan K.; Orav, E John; Jones, Richard N.

    2010-01-01

    Objectives To determine whether a Delirium Abatement Program (DAP) can shorten the duration of delirium among new admissions to post-acute care (PAC). Design Cluster randomized controlled trial. Setting Eight skilled nursing facilities specializing in PAC within a single metropolitan region. Participants Four hundred fifty-seven participants with delirium at PAC admission. Intervention The DAP consisted of four steps: 1) assessment for delirium within 5 days of PAC admission, 2) assessment and correction of common reversible causes of delirium, 3) prevention of complications of delirium, and 4) restoration of function. Measurements Eligible patients were screened by trained researchers. Those with Confusion Assessment Method defined delirium were eligible for participation via proxy consent. Two weeks and one month after enrollment, regardless of location, participants were re-assessed for delirium by researchers blind to intervention status. Results Nurses at DAP sites detected delirium in 41% of participants vs. 12% in usual care (UC) sites (p<.001) and completed DAP documentation in most delirium-detected participants. However, the DAP intervention had no impact on delirium persistence based on two measurements at 2 weeks (DAP 68% vs. UC 66%) and 1 month (DAP 60% vs. UC 51%), adjusted p values ≥ 0.20. Adjusting for baseline differences between DAP and UC participants and restricting analysis to delirium-detected DAP participants did not alter the results. Conclusion Detection of delirium improved at the DAP sites, however, the DAP had no impact on the persistence of delirium. This effectiveness trial demonstrated that a nurse-led DAP intervention was not effective in typical PAC facilities. PMID:20487083

  16. Fermilab Program and Plans

    SciTech Connect

    Denisov, Dmitri

    2014-01-01

    This article is a short summary of the talk presented at 2014 Instrumentation Conference in Novosibirsk about Fermilab's experimental program and future plans. It includes brief description of the P5 long term planning progressing in US as well as discussion of the future accelerators considered at Fermilab.

  17. [Laparoscopic surgery: planning program].

    PubMed

    Sarli, L; Pietra, N; Carreras, F; Longinotti, E

    1992-01-01

    Performing laparoscopic surgery requires an initial training program. A well-planned organization is essential and the surgeon has to become first familiar with the new procedures; the choice of the necessary equipment is the second step. Upkeep of surgical instruments and a careful consideration of legal aspects are the next important steps. Several areas of a planning program are evaluated on the basis of the authors' experience.

  18. Retirement Planning Program.

    ERIC Educational Resources Information Center

    Edison State Community Coll., Piqua, OH.

    This curriculum guide was developed for use in Edison State Community College's (ESCC's) Community Pre-Retirement Training Program. The first of the guide's seven modules provides a brief look at retirement, retirement planning, and the ESCC program. The second module focuses on relationships, considering issues such as communication, finances,…

  19. Planned Programming Pays Dividends

    ERIC Educational Resources Information Center

    Geraldi, Kevin M.

    2008-01-01

    In this article, the author explains that before beginning to create concert programs, it is important that ensemble conductors first develop a long-term curricular plan to which each individual program will contribute. He continues that if an ensemble curriculum is devised so that students make progress over the long term, dynamic growth can take…

  20. Planned Programming Pays Dividends

    ERIC Educational Resources Information Center

    Geraldi, Kevin M.

    2008-01-01

    In this article, the author explains that before beginning to create concert programs, it is important that ensemble conductors first develop a long-term curricular plan to which each individual program will contribute. He continues that if an ensemble curriculum is devised so that students make progress over the long term, dynamic growth can take…

  1. Y-12 National Security Complex Biological Monitoring And Abatement Program 2008 Calendar Year Report

    SciTech Connect

    Peterson, M. J.; Greeley Jr., M. S.; Mathews, T. J.; Morris, G. W.; Roy, W. K.; Ryon, M. G.; Smith, J. G.; Southworth, G. R.

    2009-07-01

    The National Pollutant Discharge Elimination System (NPDES) permit issued for the Oak Ridge Y-12 National Security Complex (Y-12 Complex) which became effective May 1, 2006, continued a requirement for a Biological Monitoring and Abatement Program (BMAP). The BMAP was originally developed in 1985 to demonstrate that the effluent limitations established for the Y-12 Complex protected the classified uses of the receiving stream (East Fork Poplar Creek: EFPC), in particular, the growth and propagation of aquatic life (Loar et al. 1989). The objectives of the current BMAP are similar, specifically to assess stream ecological conditions relative to regulatory limits and criteria, to assess ecological impacts as well as recovery in response to Y-12 operations, and to investigate the causes of continuing impacts. The BMAP consists of three tasks that reflect complementary approaches to evaluating the effects of the Y-12 Complex discharges on the biotic integrity of EFPC. These tasks include: (1) bioaccumulation monitoring, (2) benthic macroinvertebrate community monitoring, and (3) fish community monitoring. As required by the NPDES permit, the BMAP benthic macroinvertebrate community monitoring task includes studies to annually evaluate the receiving stream's biological integrity in comparison to TN Water Quality Criteria. BMAP monitoring is currently being conducted at five primary EFPC sites, although sites may be excluded or added depending upon the specific objectives of the various tasks. Criteria used in selecting the sites include: (1) location of sampling sites used in other studies, (2) known or suspected sources of downstream impacts, (3) proximity to U.S. Department of Energy (DOE) Oak Ridge Reservation (ORR) boundaries, (4) appropriate habitat distribution, and (5) access. The primary sampling sites include upper EFPC at kilometers (EFKs) 24.4 and 23.4 [upstream and downstream of Lake Reality (LR) respectively]; EFK 18.7 (also EFK 18.2 and 19), located off

  2. Y-12 National Security Complex Biological Monitoring and Abatement Program 2007 Calendar Yeare Report

    SciTech Connect

    Peterson, M.J.; Greeley, M. S. Jr.; Morris, G. W.; Roy, W. K.; Ryan, M. G.; Smith, J. G.; Southworth, G. R.

    2008-07-01

    The National Pollutant Discharge Elimination System (NPDES) permit issued for the Oak Ridge Y-12 National Security Complex (Y-12 Complex) which became effective May 1, 2006, continued a requirement for a Biological Monitoring and Abatement Program (BMAP). The BMAP was originally developed in 1985 to demonstrate that the effluent limitations established for the Y-12 Complex protected the classified uses of the receiving stream (East Fork Poplar Creek: EFPC), in particular, the growth and propagation of aquatic life (Loar et al. 1989). The objectives of the current BMAP are similar, specifically to assess stream ecological conditions relative to regulatory limits and criteria, to assess ecological impacts as well as recovery in response to Y-12 operations, and to investigate the causes of continuing impacts. The BMAP consists of three tasks that reflect complementary approaches to evaluating the effects of the Y-12 Complex discharges on the biotic integrity of EFPC. These tasks include: (1) bioaccumulation monitoring, (2) benthic macroinvertebrate community monitoring, and (3) fish community monitoring. As required by the NPDES permit, the BMAP benthic macroinvertebrate community monitoring task includes studies to annually evaluate the receiving stream's biological integrity in comparison to TN Water Quality Criteria. BMAP monitoring is currently being conducted at five primary EFPC sites, although sites may be excluded or added depending upon the specific objectives of the various tasks. Criteria used in selecting the sites include: (1) location of sampling sites used in other studies, (2) known or suspected sources of downstream impacts, (3) proximity to U.S. Department of Energy (DOE) Oak Ridge Reservation (ORR) boundaries, (4) appropriate habitat distribution, and (5) access. The primary sampling sites include upper EFPC at kilometers (EFKs) 24.4 and 23.4 [upstream and downstream of Lake Reality (LR) respectively]; EFK 18.7 (also EFK 18.2 and 19), located off

  3. Educational program emergency planning.

    PubMed

    Curtis, Tammy

    2009-01-01

    Tragic university shootings have prompted administrators of higher education institutions to re-evaluate their emergency preparedness plans and take appropriate measures for preventing and responding to emergencies. To review the literature and identify key components needed to prevent shootings at higher education institutions in the United States, and in particular, institutions housing radiologic science programs. Twenty-eight emergency preparedness plans were retrieved electronically and reviewed from a convenience sample of accredited radiologic science programs provided by the Joint Review Committee on Education in Radiologic Technology Web site. The review of the 28 emergency preparedness plans confirmed that most colleges are prepared for basic emergencies, but lack the key components needed to successfully address mass-casualty events. Only 5 (18%) of the 28 institutions addressed policies concerning school shootings.

  4. ESnet Program Plan 1994

    SciTech Connect

    Merola, S.

    1994-11-01

    This Program Plan characterizes ESnet with respect to the current and future needs of Energy Research programs for network infrastructure, services, and development. In doing so, this document articulates the vision and recommendations of the ESnet Steering Committee regarding ESnet`s development and its support of computer networking facilities and associated user services. To afford the reader a perspective from which to evaluate the ever-increasing utility of networking to the Energy Research community, we have also provided a historical overview of Energy Research networking. Networking has become an integral part of the work of DOE principal investigators, and this document is intended to assist the Office of Scientific Computing in ESnet program planning and management, including prioritization and funding. In particular, we identify the new directions that ESnet`s development and implementation will take over the course of the next several years. Our basic goal is to ensure that the networking requirements of the respective scientific programs within Energy Research are addressed fairly. The proliferation of regional networks and additional network-related initiatives by other Federal agencies is changing the process by which we plan our own efforts to serve the DOE community. ESnet provides the Energy Research community with access to many other peer-level networks and to a multitude of other interconnected network facilities. ESnet`s connectivity and relationship to these other networks and facilities are also described in this document. Major Office of Energy Research programs are managed and coordinated by the Office of Basic Energy Sciences, the Office of High Energy and Nuclear Physics, the Office of Magnetic Fusion Energy, the Office of Scientific Computing, and the Office of Health and Environmental Research. Summaries of these programs are presented, along with their functional and technical requirements for wide-area networking.

  5. SNS application programming plan.

    SciTech Connect

    Chu, C. M.; Galambos, J. D.; Wei, J.; Allen, C.; McGehee, P. M.; Malitsky, N.

    2001-01-01

    The plan for Spallation Neutron Source accelerator physics application programs is presented. These high level applications involve processing and managing information from the diagnostic instruments, the machine control system, models and static databases and will be used to investigate and control beam behavior. Primary components include an SNS global database and Java-based XAL Application Toolkit. A key element in the SNS application programs is time synchronization of data used in these applications, due to the short pulse (1 ms), pulsed (60 Hz) nature of the device. The data synchronization progress is also presented.

  6. ADS pilot program Plan

    NASA Technical Reports Server (NTRS)

    Clauson, J.; Heuser, J.

    1981-01-01

    The Applications Data Service (ADS) is a system based on an electronic data communications network which will permit scientists to share the data stored in data bases at universities and at government and private installations. It is designed to allow users to readily locate and access high quality, timely data from multiple sources. The ADS Pilot program objectives and the current plans for accomplishing those objectives are described.

  7. Noise Abatement

    NASA Technical Reports Server (NTRS)

    1983-01-01

    SMART, Sound Modification and Regulated Temperature compound, is a liquid plastic mixture with exceptional energy and sound absorbing qualities. It is derived from a very elastic plastic which was an effective noise abatement material in the Apollo Guidance System. Discovered by a NASA employee, it is marketed by Environmental Health Systems, Inc. (EHS). The product has been successfully employed by a diaper company with noisy dryers and a sugar company with noisy blowers. The company also manufactures an audiometric test booth and acoustical office partitions.

  8. Comprehensive Plan for Program Evaluation.

    ERIC Educational Resources Information Center

    Orange County Public Schools, Orlando, FL. Testing and Program Evaluation Section.

    The evaluation plans for the Orange County Public Schools, Orlando, Florida, are summarized. Both instructional programs and support services are assessed, to determine the effectiveness of the programs as well as their value. Evaluations are planned and conducted by the Program Evaluation Section, using the Educational Planning and Resource…

  9. Assessment of blood lead level declines in an area of historical mining with a holistic remediation and abatement program.

    PubMed

    Schoof, Rosalind A; Johnson, Dina L; Handziuk, Emma R; Landingham, Cynthia Van; Feldpausch, Alma M; Gallagher, Alexa E; Dell, Linda D; Kephart, Amy

    2016-10-01

    Lead exposure and blood lead levels (BLLs) in the United States have declined dramatically since the 1970s as many widespread lead uses have been discontinued. Large scale mining and mineral processing represents an additional localized source of potential lead exposure in many historical mining communities, such as Butte, Montana. After 25 years of ongoing remediation efforts and a residential metals abatement program that includes blood lead monitoring of Butte children, examination of blood lead trends offers a unique opportunity to assess the effectiveness of Butte's lead source and exposure reduction measures. This study examined BLL trends in Butte children ages 1-5 (n= 2796) from 2003-2010 as compared to a reference dataset matched for similar demographic characteristics over the same period. Blood lead differences across Butte during the same period are also examined. Findings are interpreted with respect to effectiveness of remediation and other factors potentially contributing to ongoing exposure concerns. BLLs from Butte were compared with a reference dataset (n=2937) derived from the National Health and Nutrition Examination Survey. The reference dataset was initially matched for child age and sample dates. Additional demographic factors associated with higher BLLs were then evaluated. Weights were applied to make the reference dataset more consistent with the Butte dataset for the three factors that were most disparate (poverty-to-income ratio, house age, and race/ethnicity). A weighted linear mixed regression model showed Butte geometric mean BLLs were higher than reference BLLs for 2003-2004 (3.48vs. 2.05µg/dL), 2005-2006 (2.65vs. 1.80µg/dL), and 2007-2008 (2.2vs. 1.72µg/dL), but comparable for 2009-2010 (1.53vs. 1.51µg/dL). This trend suggests that, over time, the impact of other factors that may be associated with Butte BLLs has been reduced. Neighborhood differences were examined by dividing the Butte dataset into the older area called "Uptown

  10. Logistics planning for phased programs.

    NASA Technical Reports Server (NTRS)

    Cook, W. H.

    1973-01-01

    It is pointed out that the proper and early integration of logistics planning into the phased program planning process will drastically reduce these logistics costs. Phased project planning is a phased approach to the planning, approval, and conduct of major research and development activity. A progressive build-up of knowledge of all aspects of the program is provided. Elements of logistics are discussed together with aspects of integrated logistics support, logistics program planning, and logistics activities for phased programs. Continuing logistics support can only be assured if there is a comprehensive sequential listing of all logistics activities tied to the program schedule and a real-time inventory of assets.

  11. NASA program plan

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Major facts are given for NASA'S planned FY-1981 through FY-1985 programs in aeronautics, space science, space and terrestrial applications, energy technology, space technology, space transportation systems, space tracking and data systems, and construction of facilities. Competition and cooperation, reimbursable launchings, schedules and milestones, supporting research and technology, mission coverage, and required funding are considered. Tables and graphs summarize new initiatives, significant events, estimates of space shuttle flights, and major missions in astrophysics, planetary exploration, life sciences, environmental and resources observation, and solar terrestrial investigations. The growth in tracking and data systems capabilities is also depicted.

  12. Lead abatement training for supervisors and contractors. Instructors guide

    SciTech Connect

    Not Available

    1999-01-01

    This training program is designed to be a 32 hour training course, and is intended for individuals supervising residential lead abatement projects. The course is designed to meet the requirements of 40 CFR Part 745-Lead. Requirements for Lead-Based Paint Activities in Target Housing and Child Occupied Facilities, a federal regulation under section 402 of the Toxic Substance Control Act (TSCA). Topics covered in the course include; the history of lead; health effects; legal and insurance consideration; regulations overview; inspection and risk assessment; report interpretation; development and implementation of occupant protection plans; paint hazard recognition and materials identification; XRF testing/sampling and abatement methods.

  13. TWRS safety program plan

    SciTech Connect

    Calderon, L.M., Westinghouse Hanford

    1996-08-01

    Management of Nuclear Safety, Industrial Safety, Industrial Hygiene, and Fire Protection programs, functions, and field support resources for Tank Waste Remediation Systems (TWRS) has, until recently, been centralized in TWRS Safety, under the Emergency, Safety, and Quality organization. Industrial hygiene technician services were also provided to support operational needs related to safety basis compliance. Due to WHC decentralization of safety and reengineering efforts in West Tank Farms, staffing and safety responsibilities have been transferred to the facilities. Under the new structure, safety personnel for TWRS are assigned directly to East Tank Farms, West Tank Farms, and a core Safety Group in TWRS Engineering. The Characterization Project Operations (CPO) safety organization will remain in tact as it currently exists. Personnel assigned to East Tank Farms, West Tank Farms, and CPO will perform facility-specific or project-specific duties and provide field implementation of programs. Those assigned to the core group will focus on activities having a TWRS-wide or programmatic focus. Hanford-wide activities will be the responsibility of the Safety Center of Expertise. In order to ensure an effective and consistent safety program for TWRS under the new organization program functions, goals, organizational structure, roles, responsibilities, and path forward must be clearly established. The purpose of the TWRS Safety Program Plan is to define the overall safety program, responsibilities, relationships, and communication linkages for safety personnel under the new structure. In addition, issues associated with reorganization transition are addressed, including training, project ownership, records management, and dissemination of equipment. For the purpose of this document ``TWRS Safety`` refers to all safety professionals and technicians (Industrial Safety, Industrial Hygiene, Fire Protection, and Nuclear Safety) within the TWRS organization, regardless of their

  14. Plan for study: response of the habitat and biota of the inner New York Bight to abatement of sewage sludge dumping. Technical memo

    SciTech Connect

    Not Available

    1988-06-01

    The purpose of this study was to document changes in living marine resources and their habitats during and following the period in which sewage sludge dumping is phased out at the 12-mile site. Choice of monitoring variables was based on two considerations: (1) relevance to fisheries of the inner Bight, both directly, in terms of abundance, distribution, and contamination of resource species and indirectly, as indicated by quality of their habitats, and (2) predictive value in detecting changes with abatement. Biological, chemical, and physical oceanographic approaches were integrated to provide comprehensive and statistically valid work plans.

  15. National transuranic program plan

    SciTech Connect

    Not Available

    1994-10-11

    As a result of various program initiatives, the U.S. generated and will continue to generate waste contaminated with radioactive materials. Because of increased awareness of the risks and special requirements to safely manage long-lived alpha-emitting radionuclides, a new category of radioactive waste, transuranic (TRU) waste, was adopted in 1970. Heads of Field Elements can determine that other alpha-contaminated wastes, peculiar to a specific site, must be managed as transuranic waste{close_quotes}. TRU waste is generated and stored at various DOE sites around the country. In December 1993, the National Transuranic Program Office (NTPO) was established as part of the Carlsbad Area Office (CAO) to integrate and coordinate the diverse organizational elements that contribute to the complex-wide management of TRU waste. Numerous sites with small TRU waste inventories are also part of the national TRU waste system. The majority of TRU waste is also contaminated with hazardous materials and is thus considered mixed waste. Mixed waste must be managed in compliance with all federal, state, and local regulations that are applicable to the radioactive and/or hazardous component of the waste. Each generator site is responsible for the management of its respective waste. Sites must plan and implement programs to minimize, characterize, package, treat, store, ship, and dispose of all TRU waste; construct required waste management facilities and equipment; obtain permits; perform site-specific National Environmental Policy Act (NEPA) analyses; conduct environmental studies; perform laboratory analyses; and certify that waste meets appropriate disposal facility criteria. Due to the toxicity and long half-lives of TRU radionuclides, TRU waste must be disposed in a manner that offers greater confinement than shallow land burial.

  16. First report on the Oak Ridge Y-12 Plant Biological Monitoring and Abatement Program for East Fork Poplar Creek

    SciTech Connect

    Loar, J.M.; Adams, S.M.; Allison, L.J.; Boston, H.L.; Huston, M.A.; McCarthy, J.F.; Smith, J.G.; Southworth, G.R.; Stewart, A.J. ); Black, M.C. ); Gatz, A.J. Jr. ); Hinzman, R.L. ); Jimenez, B.D. (Puerto Rico Univ.,

    1992-07-01

    As stipulated in the National Pollutant Discharge Elimination System (NPDES) permit issued to the Oak Ridge Y-12 Plant on May 24, 1985, a Biological Monitoring and Abatement Program (BMAP) was developed for the receiving stream, East Fork Poplar Creek (EFPC). The objectives of the BMAP are (1) to demonstrate that the current effluent limitations established for the Oak Ridge Y-12 Plant protect the uses of EFPC (e.g., the growth and propagation of fish and aquatic life), as designated by the Tennessee Department of Environment and Conservation (TDEC) [formerly the Tennessee Department of Health and Environment (TDHE)], and (2) to document the ecological effects resulting from implementation of a water pollution control program that includes construction of several large wastewater treatment facilities. The BMAP consists of four major tasks: (1) ambient toxicity testing, (2) bioaccumulation studies, (3) biological indicator studies, and (4) ecological surveys of stream communities, including periphyton (attached algae), benthic macroinvertebrates, and fish. This document, the first in a series of reports on the results of the Y-12 Plant BMAP, describes studies that were conducted from May 1985 through September 1986.

  17. Second report on the Oak Ridge Y-12 Plant Biological Monitoring and Abatement Program for East Fork Poplar Creek

    SciTech Connect

    Hinzman, R.L.; Adams, S.M.; Black, M.C.

    1993-06-01

    As stipulated in the National Pollutant Discharge Elimination System (NDPES) permit issued to the Oak Ridge Y-12 Plant on May 24, 1986, a Biological Monitoring and Abatement Program (BMAP) was developed for the receiving stream, East Fork Poplar Creek (EFPC). The objectives of BMAP are (1) to demonstrate that the current effluent limitations established for the Y-12 Plant protect the classified uses of EFPC (e.g., the growth and propagation of fish and aquatic life), as designated by the Tennessee Department of Environment and Conservation (TDEC) and (2) to document the ecological effects resulting from implementation of a Water Pollution Control Program that includes construction of several large wastewater treatment facilities. BMAP consists of four major tasks: (1) ambient toxicity testing; (2) bioaccumulation studies; (3) biological indicator studies; and (4) ecological surveys of stream communities, including periphyton (attached algae), benthic (bottom-dwelling) macroinvertebrates, and fish. This document, the second in a series of reports on the results of the Y-12 Plant BMAP, describes studies that were conducted between July 1986 and July 1988, although additional data collected outside this time period are included, as appropriate.

  18. Programs for road network planning.

    Treesearch

    Ward W. Carson; Dennis P. Dykstra

    1978-01-01

    This paper describes four computer programs developed to assist logging engineers to plan transportation in a forest. The objective of these programs, to be used together, is to find the shortest path through a transportation network from a point of departure to a destination. Three of the programs use the digitizing and plotting capabilities of a programable desk-top...

  19. LDRD FY 2014 Program Plan

    SciTech Connect

    Anita Gianotto; Dena Tomchak

    2013-08-01

    As required by DOE Order 413.2B the FY 2014 Program Plan is written to communicate ares of investment and approximate amounts being requested for the upcoming fiscal year. The program plan also includes brief highlights of current or previous LDRD projects that have an opportunity to impact our Nation's current and future energy challenges.

  20. New Production Reactors Program Plan

    SciTech Connect

    Not Available

    1990-12-01

    Part I of this New Production Reactors (NPR) Program Plan: describes the policy basis of the NPR Program; describes the mission and objectives of the NPR Program; identifies the requirements that must be met in order to achieve the mission and objectives; and describes and assesses the technology and siting options that were considered, the Program's preferred strategy, and its rationale. The implementation strategy for the New Production Reactors Program has three functions: Linking the design, construction, operation, and maintenance of facilities to policies requirements, and the process for selecting options. The development of an implementation strategy ensures that activities and procedures are consistent with the rationale and analysis underlying the Program. Organization of the Program. The strategy establishes plans, organizational structure, procedures, a budget, and a schedule for carrying out the Program. By doing so, the strategy ensures the clear assignment of responsibility and accountability. Management and monitoring of the Program. Finally, the strategy provides a basis for monitoring the Program so that technological, cost, and scheduling issues can be addressed when they arise as the Program proceeds. Like the rest of the Program Plan, the Implementation Strategy is a living document and will be periodically revised to reflect both progress made in the Program and adjustments in plans and policies as they are made. 21 figs., 5 tabs.

  1. Operation Stay-in-School: A Truancy Abatement Program. Technical Assistance Bulletin 15.

    ERIC Educational Resources Information Center

    National School Resource Network, Washington, DC.

    The Operation Stay-in-School (OSIS) program was developed to reduce truancy before it diminishes the value of the student's education, leads to other problems such as increased burglary, vandalism, and drug abuse, and reduces the school district's attendance revenue. Truants apprehended by police are taken to OSIS reception centers where they are…

  2. Fiscal year 1987 program plan

    SciTech Connect

    Not Available

    1986-12-01

    The Defense TRU Waste Program (DTWP) is the focal point for the Department of Energy in national planning, integration, operation, and technical development for TRU waste management. The scope of this program extends from the point of TRU waste generation through delivery to a permanent repository. The TRU program maintains a close interface with repository development to ensure program compatibility and coordination. The defense TRU program does not directly address commercial activities that generate TRU waste. Instead, it is concerned with providing alternatives to manage existing and future defense TRU wastes. The FY 87 Program Plan is consistent with the Defense TRU Waste Program goals and objectives stated in the Defense Transuranic Waste Program Strategy Document, January 1984. The roles of participants, the responsibilities and authorities for Operations, and Research Development (R D), the organizational interfaces and communication channels for R D and the establishment of procedures for planning, reporting, and budgeting of Operations and R D activities meet requirements stated in the Technical Management Plan for the Transuranic Waste Management Program. Detailed budget planning (i.e., programmatic funding and capital equipment) is presented for FY 87; outyear budget projections are presented for future years.

  3. Tennessee's East Fork Poplar Creek: A biological monitoring and abatement program

    SciTech Connect

    Halbrook, R.S. ); Loar, J.M.; Adams, S.M.; Black, M.C.; Boston, H.L.; Greeley, M.S. Jr.; Hill, W.R.; Hinzman, R.L.; McCarthy, J.F.; Peterson, M.J.; Ryon, M.G.; Schilling, E.M.; Smith, J.G.; Southworth, G.R.; Stewart, A.J. ); Gatz, A.J. )

    1991-01-01

    On May 1985, a Biological Monitoring Program was developed for East Fork Poplar Creek (EFPC) in eastern Tennessee, United States. This stream originates within the Oak Ridge Y-12 Plant that produces nuclear weapons components for the Department of Energy. Water and sediment in the stream contain metals, organic chemicals, and radionuclides from releases that have occurred over the past 45 years. The creek also receives urban and some agricultural runoff and effluent from the City of Oak Ridge's Wastewater Treatment Facility (WTF). The biological monitoring program includes four major tasks: (1) ambient toxicity testing: (2) bioaccumulation studies; (3) biological indicator studies; and (4) ecological monitoring of stream communities, including periphyton, benthic macroinvertebrates, and fish. Biological conditions are monitored at six sites on EFPC ranging from kilometer 24.4 near the headwaters to kilometer 6.3 near the month. A site on Brushy Fork, A stream just north of Oak Ridge, is used as reference. Ambient (instream) toxicity was monitored through the use of 7-day static-renewal tests that measured the survival and growth of fathead minnow (Pimephales promelas) larvae and the survival and reproduction of a microstrustacean (Ceriodaphnia dubia). Full-strength water from EFPC within the Y-12 Plant boundary was frequently toxic to Ceriodaphnia, but less frequently toxic to the minnow larvae. Chlorine has been identified as an important toxicant in upper EFPC. Water samples from six sites in EFPC downstream from the Y-12 Plant boundary were tested eight times with both species during a 2-year period (October, 1986 through October, 1988). These sites were ranked by the number of times they were best'' or worst'' for each species. Water samples collected for use in the ambient toxicity tests were routinely analyzed for conductivity, pH, alkalinity, hardness, total residual and free chlorine, and temperature.

  4. Tennessee`s East Fork Poplar Creek: A biological monitoring and abatement program

    SciTech Connect

    Halbrook, R.S.; Loar, J.M.; Adams, S.M.; Black, M.C.; Boston, H.L.; Greeley, M.S. Jr.; Hill, W.R.; Hinzman, R.L.; McCarthy, J.F.; Peterson, M.J.; Ryon, M.G.; Schilling, E.M.; Smith, J.G.; Southworth, G.R.; Stewart, A.J.; Gatz, A.J.

    1991-12-31

    On May 1985, a Biological Monitoring Program was developed for East Fork Poplar Creek (EFPC) in eastern Tennessee, United States. This stream originates within the Oak Ridge Y-12 Plant that produces nuclear weapons components for the Department of Energy. Water and sediment in the stream contain metals, organic chemicals, and radionuclides from releases that have occurred over the past 45 years. The creek also receives urban and some agricultural runoff and effluent from the City of Oak Ridge`s Wastewater Treatment Facility (WTF). The biological monitoring program includes four major tasks: (1) ambient toxicity testing: (2) bioaccumulation studies; (3) biological indicator studies; and (4) ecological monitoring of stream communities, including periphyton, benthic macroinvertebrates, and fish. Biological conditions are monitored at six sites on EFPC ranging from kilometer 24.4 near the headwaters to kilometer 6.3 near the month. A site on Brushy Fork, A stream just north of Oak Ridge, is used as reference. Ambient (instream) toxicity was monitored through the use of 7-day static-renewal tests that measured the survival and growth of fathead minnow (Pimephales promelas) larvae and the survival and reproduction of a microstrustacean (Ceriodaphnia dubia). Full-strength water from EFPC within the Y-12 Plant boundary was frequently toxic to Ceriodaphnia, but less frequently toxic to the minnow larvae. Chlorine has been identified as an important toxicant in upper EFPC. Water samples from six sites in EFPC downstream from the Y-12 Plant boundary were tested eight times with both species during a 2-year period (October, 1986 through October, 1988). These sites were ranked by the number of times they were ``best`` or ``worst`` for each species. Water samples collected for use in the ambient toxicity tests were routinely analyzed for conductivity, pH, alkalinity, hardness, total residual and free chlorine, and temperature.

  5. Population Growth: Family Planning Programs.

    ERIC Educational Resources Information Center

    Doberenz, Alexander R., Ed.; Taylor, N. Burwell G., Ed.

    These proceedings of the second annual symposium on population growth bring together speeches and panel discussions on family planning programs. Titles of speeches delivered are: Communicating Family Planning (Mrs. Jean Hutchinson); Effects of New York's Abortion Law Change (Dr. Walter Rogers); The Law and Birth Control, Sterilization and Abortion…

  6. Art. Program Planning, Primary, Junior.

    ERIC Educational Resources Information Center

    York Borough Board of Education, Toronto (Ontario).

    Over 20 ideas for planning art programs for grades 1 through 6 are included in this planning guide. Introductory comments stress the individuality of children and caution art teachers not to judge by adult standards and not to direct lessons step-by-step or show how things should be drawn. Outdoor sketching is recommended as a way to develop…

  7. Biomedical programs operations plans

    NASA Technical Reports Server (NTRS)

    Walbrecher, H. F.

    1974-01-01

    Operational guidelines for the space shuttle life sciences payloads are presented. An operational assessment of the medical experimental altitude test for Skylab, and Skylab life sciences documentation are discussed along with the operations posture and collection of space shuttle operational planning data.

  8. Performance assurance program plan

    SciTech Connect

    Rogers, B.H.

    1997-11-06

    B and W Protec, Inc. (BWP) is responsible for implementing the Performance Assurance Program for the Project Hanford Management Contract (PHMC) in accordance with DOE Order 470.1, Safeguards and Security Program (DOE 1995a). The Performance Assurance Program applies to safeguards and security (SAS) systems and their essential components (equipment, hardware, administrative procedures, Protective Force personnel, and other personnel) in direct support of Category I and H special nuclear material (SNM) protection. Performance assurance includes several Hanford Site activities that conduct performance, acceptance, operability, effectiveness, and validation tests. These activities encompass areas of training, exercises, quality assurance, conduct of operations, total quality management, self assessment, classified matter protection and control, emergency preparedness, and corrective actions tracking and trending. The objective of the Performance Assurance Program is to capture the critical data of the tests, training, etc., in a cost-effective, manageable program that reflects the overall effectiveness of the program while minimizing operational impacts. To aid in achieving this objective, BWP will coordinate the Performance Assurance Program for Fluor Daniel Hanford, Inc. (FDH) and serve as the central point for data collection.

  9. Wildlife monitoring program plan

    NASA Technical Reports Server (NTRS)

    Sebesta, P.; Arno, R.

    1979-01-01

    A plan for integrating the various requirements for wildlife monitoring with modern aerospace technology is presented. This plan is responsive to user needs, recognizes legal requirements, and is based on an evolutionary growth from domestic animals and larger animals to smaller, more scarce and remote species. The basis for animal study selection was made from the 1973 Santa Cruz Summer Study on Wildlife Monitoring. As techniques are developed the monitoring and management tasks will be interfaced with and eventually operated by the user agencies. Field efforts, aircraft and satellites, will be supplemented by laboratory investigations. Sixty percent of the effort will be in hardware research and development (satellite technology, microminiaturization) and the rest for gathering and interpreting data.

  10. Planning and Program Budgeting Workbook.

    ERIC Educational Resources Information Center

    Redburn, Steve; And Others

    The workbook is a training tool designed to make the concept of program planning and budgeting available to small social agencies in a simplified and practical form. It begins with a glossary and an explanation of the Annual Program Budgeting Cycle, the basis for the process described. The first four chapters contain summarized material,…

  11. Hanford Environmental Management Program Plan

    SciTech Connect

    DeFigh-Price, C.

    1989-09-01

    The Hanford Environmental Management Program (HEMP) was established in November 1986 by the US Department of Energy-Richland Operations Office (DOE-RL). Westinghouse Hanford Company (WHC) has been assigned responsibility to manage this program. The program`s goal is to integrate environmental activities such as reporting and planning and to facilitate compliance with environmental regulations. This document describes the scope of work funded by this program for Fiscal Year (FY) 1990, presents the prioritized tasks covered, the management structure in place and the assessment allocation methodology used to determine the FY 1990 assessments. 15 refs., 3 figs., 2 tabs.

  12. CEBAF - environmental protection program plan

    SciTech Connect

    1995-10-01

    An important objective in the successful operation of the Continuous Electron Beam Accelerator Facility (CEBAF) is to ensure protection of the public and the environment. To meet this objective, the Southeastern Universities Research Association, Inc., (SURA) is committed to working with the US Department of Energy (DOE) to develop, implement, and manage a sound and workable environmental protection program at CEBAF. This environmental protection plan includes information on environmental monitoring, long-range monitoring, groundwater protection, waste minimization, and pollution prevention awareness program plan.

  13. Site Support Program Plan Infrastructure Program

    SciTech Connect

    1995-09-26

    The Fiscal Year 1996 Infrastructure Program Site Support Program Plan addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition. The Hanford Site`s infrastructure has served the Site for nearly 50 years during defense materials production. Now with the challenges of the new environmental cleanup mission, Hanford`s infrastructure must meet current and future mission needs in a constrained budget environment, while complying with more stringent environmental, safety, and health regulations. The infrastructure requires upgrading, streamlining, and enhancement in order to successfully support the site mission of cleaning up the Site, research and development, and economic transition.

  14. Insect abatement system

    NASA Technical Reports Server (NTRS)

    Spiro, Clifford Lawrence (Inventor); Burnell, Timothy Brydon (Inventor); Wengrovius, Jeffrey Hayward (Inventor)

    1997-01-01

    An insect abatement system prevents adhesion of insect debris to surfaces which must be kept substantially free of insect debris. An article is coated with an insect abatement coating comprising polyorganosiloxane with a Shore A hardness of less than 50 and a tensile strength of less than 4 MPa. A method for preventing the adhesion of insect debris to surfaces includes the step of applying an insect abatement coating to a surface which must be kept substantially free of insect debris.

  15. 20 CFR 632.255 - Program planning.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Program planning. 632.255 Section 632.255... EMPLOYMENT AND TRAINING PROGRAMS Summer Youth Employment and Training Programs § 632.255 Program planning. (a... with its title IV program. (2) Native American grantees shall use the planning process described...

  16. Head Start Planned Variation Program.

    ERIC Educational Resources Information Center

    Klein, Jenny

    There is little agreement concerning which methods of preschool intervention are most effective. In order to evaluate several approaches to early childhood education, Project Head Start, in conjunction with Project Follow Through, has initiated the Planned Variation program. This year only a pilot project is underway with eight schools…

  17. Agricultural Occupations Programs Planning Guides

    ERIC Educational Resources Information Center

    Stitt, Thomas R.; And Others

    1977-01-01

    A set of program planning guides that include seven areas (1) Agricultural Production, (2) Agricultural Supplies and Services, (3) Agricultural Mechanics, (4) Agricultural Products, (5) Ornamental Horticulture, (6) Agricultural Resources, and (7) Forestry, were developed and introduced to high school applied biological and agricultural occupations…

  18. Solid Waste Management Program Plan

    SciTech Connect

    Duncan, D.R.

    1990-08-01

    The objective of the Solid Waste Management Program Plan (SWMPP) is to provide a summary level comprehensive approach for the storage, treatment, and disposal of current and future solid waste received at the Hanford Site (from onsite and offsite generators) in a manner compliant with current and evolving regulations and orders (federal, state, and Westinghouse Hanford Company (Westinghouse Hanford)). The Plan also presents activities required for disposal of selected wastes currently in retrievable storage. The SWMPP provides a central focus for the description and control of cost, scope, and schedule of Hanford Site solid waste activities, and provides a vehicle for ready communication of the scope of those activities to onsite and offsite organizations. This Plan represents the most complete description available of Hanford Site Solid Waste Management (SWM) activities and the interfaces between those activities. It will be updated annually to reflect changes in plans due to evolving regulatory requirements and/or the SWM mission. 8 refs., 9 figs., 4 tabs.

  19. Transportation technology program: Strategic plan

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The purpose of this report is to define the technology program required to meet the transportation technology needs for current and future civil space missions. It is a part of an integrated plan, prepared by NASA in part in response to the Augustine Committee recommendations, to describe and advocate expanded and more aggressive efforts in the development of advanced space technologies. This expanded program will provide a technology basis for future space missions to which the U.S. aspires, and will help to regain technology leadership for the U.S. on a broader front. The six aspects of this integrated program/plan deal with focused technologies to support space sciences, exploration, transportation, platforms, and operations as well as provide a Research and Technology Base Program. This volume describes the technologies needed to support transportation systems, e.g., technologies needed for upgrades to current transportation systems and to provide reliable and efficient transportation for future space missions. The Office of Aeronautics, Exploration, and Technology (OAET) solicited technology needs from the major agency technology users and the aerospace industry community and formed a transportation technology team (appendix A) to develop a technology program to respond to those needs related to transportation technologies. This report addresses the results of that team activity. It is a strategic plan intended for use as a planning document rather than as a project management tool. It is anticipated that this document will be primarily utilized by research & technology (R&T) management at the various NASA Centers as well as by officials at NASA Headquarters and by industry in planning their corporate Independent Research and Development (IR&D) investments.

  20. Fourth report on the Oak Ridge National Laboratory Biological Monitoring and Abatement Program for White Oak Creek Watershed and the Clinch River

    SciTech Connect

    Loar, J.M.

    1994-04-01

    In response to a condition of the National Pollutant Discharge Elimination System (NPDES) permit issued to Oak Ridge National Laboratory (ORNL) on April 1, 1986, a Biological Monitoring and Abatement Program (BMAP) was developed for White Oak Creek (WOC) and selected tributaries. BMAP currently consists of six major tasks that address both radiological and nonradiological contaminants in the aquatic and terrestrial environs on-site and the aquatic environs off-site. These tasks are (1) toxicity monitoring, (2) bioaccumulation monitoring of nonradiological contaminants in aquatic biota, (3) biological indicator studies, (4) instream ecological monitoring, (5) assessment of contaminants in the terrestrial environment, and (6) radioecology of WOC and White Oak Lake. The ecological characterization of the WOC watershed will provide baseline data that can be used to document the ecological effects of the water pollution control program and the remedial action program. The long-term nature of BMAP ensures that the effectiveness of remedial measures will be properly evaluated.

  1. An interval-based possibilistic programming method for waste management with cost minimization and environmental-impact abatement under uncertainty.

    PubMed

    Li, Y P; Huang, G H

    2010-09-15

    Considerable public concerns have been raised in the past decades since a large amount of pollutant emissions from municipal solid waste (MSW) disposal of processes pose risks on surrounding environment and human health. Moreover, in MSW management, various uncertainties exist in the related costs, impact factors and objectives, which can affect the optimization processes and the decision schemes generated. In this study, an interval-based possibilistic programming (IBPP) method is developed for planning the MSW management with minimized system cost and environmental impact under uncertainty. The developed method can deal with uncertainties expressed as interval values and fuzzy sets in the left- and right-hand sides of constraints and objective function. An interactive algorithm is provided for solving the IBPP problem, which does not lead to more complicated intermediate submodels and has a relatively low computational requirement. The developed model is applied to a case study of planning a MSW management system, where mixed integer linear programming (MILP) technique is introduced into the IBPP framework to facilitate dynamic analysis for decisions of timing, sizing and siting in terms of capacity expansion for waste-management facilities. Three cases based on different waste-management policies are examined. The results obtained indicate that inclusion of environmental impacts in the optimization model can change the traditional waste-allocation pattern merely based on the economic-oriented planning approach. The results obtained can help identify desired alternatives for managing MSW, which has advantages in providing compromised schemes under an integrated consideration of economic efficiency and environmental impact under uncertainty. Copyright 2010 Elsevier B.V. All rights reserved.

  2. 29 CFR 4207.3 - Abatement.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... section, as appropriate. If a bond or escrow has been provided to the plan under § 4207.4, the plan sponsor shall send a copy of the notice to the bonding or escrow agent. (c) Effects of abatement. If the... applicable; (3) Any bonds furnished under § 4207.4 shall be cancelled and any amounts held in escrow under...

  3. 29 CFR 4207.3 - Abatement.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... section, as appropriate. If a bond or escrow has been provided to the plan under § 4207.4, the plan sponsor shall send a copy of the notice to the bonding or escrow agent. (c) Effects of abatement. If the... applicable; (3) Any bonds furnished under § 4207.4 shall be cancelled and any amounts held in escrow under...

  4. 29 CFR 4207.3 - Abatement.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... section, as appropriate. If a bond or escrow has been provided to the plan under § 4207.4, the plan sponsor shall send a copy of the notice to the bonding or escrow agent. (c) Effects of abatement. If the... applicable; (3) Any bonds furnished under § 4207.4 shall be cancelled and any amounts held in escrow under...

  5. 29 CFR 4207.3 - Abatement.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... section, as appropriate. If a bond or escrow has been provided to the plan under § 4207.4, the plan sponsor shall send a copy of the notice to the bonding or escrow agent. (c) Effects of abatement. If the... applicable; (3) Any bonds furnished under § 4207.4 shall be cancelled and any amounts held in escrow under...

  6. 29 CFR 4207.3 - Abatement.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... section, as appropriate. If a bond or escrow has been provided to the plan under § 4207.4, the plan sponsor shall send a copy of the notice to the bonding or escrow agent. (c) Effects of abatement. If the... applicable; (3) Any bonds furnished under § 4207.4 shall be cancelled and any amounts held in escrow under...

  7. Environmental Planning and Ecology Program Annual Report.

    SciTech Connect

    Larsen, Barbara L.

    2008-01-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  8. Single Shell Tank (SST) Program Plan

    SciTech Connect

    HAASS, C.C.

    2000-03-21

    This document provides an initial program plan for retrieval of the single-shell tank waste. Requirements, technical approach, schedule, organization, management, and cost and funding are discussed. The program plan will be refined and updated in fiscal year 2000.

  9. Program Planning Concepts in Solid Waste Management

    ERIC Educational Resources Information Center

    Brown, Sanford M., Jr.

    1972-01-01

    Presents a brief review of the program planning process, and uses the example of a solid waste program to illustrate what has or has not been accomplished through the use of the planning process. (LK)

  10. Program Planning Concepts in Solid Waste Management

    ERIC Educational Resources Information Center

    Brown, Sanford M., Jr.

    1972-01-01

    Presents a brief review of the program planning process, and uses the example of a solid waste program to illustrate what has or has not been accomplished through the use of the planning process. (LK)

  11. Active Sites Environmental Monitoring Program: Program plan

    SciTech Connect

    Ashwood, T.L.; Wickliff, D.S.; Morrissey, C.M.

    1990-10-01

    DOE Order 5820.2A requires that low-level waste (LLW) disposal sites active on or after September 1988 and all transuranic (TRU) waste storage sites be monitored periodically to assure that radioactive contamination does not escape from the waste sites and pose a threat to the public or to the environment. This plan describes such a monitoring program for the active LLW disposal sites in SWSA 6 and the TRU waste storage sites in SWSA 5 North. 14 refs., 8 figs.

  12. Interaction of pollution abatement with world dynamics

    NASA Technical Reports Server (NTRS)

    Smith, G. L.

    1973-01-01

    The world dynamics model of Jay W. Forrester was modified to account for pollution abatement. In the modified model, it is assumed that as pollution increases, efforts are made to control pollution. There is a competition between food supply, material standard of living, and pollution abatement for capital, and time is required for diversion of capital toward pollution abatement. Inclusion of pollution abatement in the model drastically alters the response of the world system for the case in which depletion of natural resources is not considered. Instead of undergoing a pollution catastrophe, all system levels move more or less smoothly toward an equilibrium. A FORTRAN program listing of the modified world dynamics model is included.

  13. Environmental Restoration Quality Program Plan

    SciTech Connect

    Colley, J.S.

    1992-08-01

    The Martin Marietta Energy Systems, Inc., Environmental Restoration (ER) Program was initially chartered on October 1, 1989, as a entral Environmental Restoration Division'' to manage the investigation and remediation of inactive sites and facilities that have been declared surplus and have no further programmatic use. The Energy Systems ER Division was established to support the DOE Oak Ridge Field Office (DOE-OR) consolidated ER Program. The DOE-OR Assistant Manager for Environmental Restoration and Waste Management provides program and budget direction to the Energy Systems ER Program for environmental restoration activities at the sites operated by Energy Systems (Oak Ridge K-25 Site, Oak Ridge National Laboratory, Oak Ridge Y-12 Plant, Paducah Gaseous Diffusion Plant, Portsmouth Gaseous Diffusion Plant) and at the off-site locations. The Energy Systems ER Division is specifically charged with assessing these sites for potential contamination and managing the cleanup processes. The Energy Systems Environmental Restoration Division was chartered on October 1, 1989, as a central organization to manage the Remedial Action (RA) Program. The purpose of this document is to ensure that: senior ER management provides planning, organization, direction, control, and support to achieve the organization's objectives; the line organization achieves quality; and overall performance is reviewed and evaluated using a rigorous assessment process.

  14. Second report on the Oak Ridge National Laboratory Biological Monitoring and Abatement Program for White Oak Creek Watershed and the Clinch River

    SciTech Connect

    Loar, J.M.; Adams, S.M.; Bailey, R.D.; Blaylock, B.G.; Boston, H.L.; Cox, D.K.; Huston, M.A.; Kimmel, B.L.; Loar, J.M.; Olsen, C.R.; Ryon, M.G.; Shugart, L.R.; Smith, J.G.; Southworth, G.R.; Stewart, A.J.; Walton, B.T.; Talmage, S.S.; Murphy, J.B.; Valentine, C.K.; Appellanis, S.M.; Jimenez, B.D.; Huq, M.V.; Meyers-Schone, L.J.; Mohrbacher, D.A.; Olsen, C.R.; Stout, J.G.

    1992-12-01

    As a condition of the National Pollutant Discharge Elimination System (NPDES) permit issued to Oak Ridge National Laboratory (ORNL) on April 1, 1986, a Biological Monitoring and Abatement Program (BMAP) was developed for White Oak Creek (WOC); selected tributaries of WOC, including Fifth Creek, First Creek, Melton Branch, and Northwest Tributary; and the Clinch River. BMAP consists of seven major tasks that address both radiological and nonradiological contaminants in the aquatic and terrestrial environs on-site and the aquatic environs off-site. These tasks are (1) toxicity monitoring; (2) bioaccumulation monitoring of nonradiological contaminants in aquatic biota; (3) biological indicator studies; (4) instream ecological monitoring; (5) assessment of contaminants in the terrestrial environment; (6) radioecology of WOC and White Oak Lake (WOL); and (7) contaminant transport, distribution, and fate in the WOC embayment-Clinch River-Watts Bar Reservoir system. This document, the second of a series of annual reports, described the results of BMAP studies conducted in 1987.

  15. 10 CFR 851.22 - Hazard prevention and abatement.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Hazard prevention and abatement. 851.22 Section 851.22 Energy DEPARTMENT OF ENERGY WORKER SAFETY AND HEALTH PROGRAM Specific Program Requirements § 851.22 Hazard prevention and abatement. (a) Contractors must establish and implement a hazard prevention and...

  16. Environmental Restoration Program Management Control Plan

    SciTech Connect

    Not Available

    1991-09-01

    This Management Control Plan has been prepared to define the Energy Systems approach to managing its participation in the US DOE's Environmental Restoration (ER) Program in a manner consistent with DOE/ORO 931: Management Plan for the DOE Field Office, Oak Ridge, Decontamination and Decommissioning Program; and the Energy Systems Environmental Restoration Contract Management Plan (CMP). This plan discusses the systems, procedures, methodology, and controls to be used by the program management team to attain these objectives.

  17. LLNL Waste Minimization Program Plan

    SciTech Connect

    Not Available

    1990-02-14

    This document is the February 14, 1990 version of the LLNL Waste Minimization Program Plan (WMPP). The Waste Minimization Policy field has undergone continuous changes since its formal inception in the 1984 HSWA legislation. The first LLNL WMPP, Revision A, is dated March 1985. A series of informal revision were made on approximately a semi-annual basis. This Revision 2 is the third formal issuance of the WMPP document. EPA has issued a proposed new policy statement on source reduction and recycling. This policy reflects a preventative strategy to reduce or eliminate the generation of environmentally-harmful pollutants which may be released to the air, land surface, water, or ground water. In accordance with this new policy new guidance to hazardous waste generators on the elements of a Waste Minimization Program was issued. In response to these policies, DOE has revised and issued implementation guidance for DOE Order 5400.1, Waste Minimization Plan and Waste Reduction reporting of DOE Hazardous, Radioactive, and Radioactive Mixed Wastes, final draft January 1990. This WMPP is formatted to meet the current DOE guidance outlines. The current WMPP will be revised to reflect all of these proposed changes when guidelines are established. Updates, changes and revisions to the overall LLNL WMPP will be made as appropriate to reflect ever-changing regulatory requirements. 3 figs., 4 tabs.

  18. An Introduction to NCOA's Retirement Planning Program.

    ERIC Educational Resources Information Center

    Fitzpatrick, Edmund W.

    1980-01-01

    Describes the National Council on the Aging (NCOA)-Industry Consortium Retirement Planning Program, which consists of eight modules corresponding to eight major areas of retirement planning: life-style planning, financial planning, new careers, leisure time, health, interpersonal relationships, living arrangements, and community services. (SK)

  19. Multi-Year Program Plan - Building Regulatory Programs

    SciTech Connect

    none,

    2010-10-01

    This document presents DOE’s multi-year plan for the three components of the Buildings Regulatory Program: Appliance and Equipment Efficiency Standards, ENERGY STAR, and the Building Energy Codes Program. This document summarizes the history of these programs, the mission and goals of the programs, pertinent statutory requirements, and DOE’s 5-year plan for moving forward.

  20. Mathematical Programming Models in Educational Planning.

    ERIC Educational Resources Information Center

    McNamara, James F.

    This document begins by defining and discussing educational planning. A brief overview of mathematical programing with an explanation of the general linear programing model is then provided. Some recent applications of mathematical programing techniques to educational planning problems are reviewed, and their implications for educational research…

  1. Disposal phase experimental program plan

    SciTech Connect

    1997-01-31

    The Waste Isolation Pilot Plant (WIPP) facility comprises surface and subsurface facilities, including a repository mined in a bedded salt formation at a depth of 2,150 feet. It has been developed to safely and permanently isolate transuranic (TRU) radioactive wastes in a deep geological disposal site. On April 12, 1996, the DOE submitted a revised Resource Conservation and Recovery Act (RCRA) Part B permit application to the New Mexico Environment Department (NMED). The DOE anticipates receiving an operating permit from the NMED; this permit is required prior to the start of disposal operations. On October 29, 1996, the DOE submitted a Compliance Certification Application (CCA) to the US Environmental Protection Agency (EPA) in accordance with the WIPP land Withdrawal Act (LWA) of 1992 (Public Law 102-579) as amended, and the requirements of Title 40 of the Code of Federal Regulations (40 CFR) Parts 191 and 194. The DOE plans to begin disposal operations at the WIPP in November 1997 following receipt of certification by the EPA. The disposal phase is expected to last for 35 years, and will include recertification activities no less than once every five years. This Disposal Phase Experimental Program (DPEP) Plan outlines the experimental program to be conducted during the first 5-year recertification period. It also forms the basis for longer-term activities to be carried out throughout the 35-year disposal phase. Once the WIPP has been shown to be in compliance with regulatory requirements, the disposal phase gives an opportunity to affirm the compliance status of the WIPP, enhance the operations of the WIPP and the national TRU system, and contribute to the resolution of national and international nuclear waste management technical needs. The WIPP is the first facility of its kind in the world. As such, it provides a unique opportunity to advance the technical state of the art for permanent disposal of long-lived radioactive wastes.

  2. Active Sites Environmental Monitoring Program: Program plan

    SciTech Connect

    Ashwood, T.L.; Wickliff, D.S.; Morrissey, C.M.

    1992-02-01

    The Active Sites Environmental Monitoring Program (ASEMP), initiated in 1989, provides early detection and performance monitoring of transuranic (TRU) waste and active low-level waste (LLW) facilities at Oak Ridge National Laboratory (ORNL) in accordance with US Department of Energy (DOE) Order 5820.2A. Active LLW facilities in Solid Waste Storage Area (SWSA) 6 include Tumulus I and Tumulus II, the Interim Waste Management Facility (IWMF), LLW silos, high-range wells, asbestos silos, and fissile wells. The tumulus pads and IWMF are aboveground, high-strength concrete pads on which concrete vaults containing metal boxes of LLW are placed; the void space between the boxes and vaults is filled with grout. Eventually, these pads and vaults will be covered by an engineered multilayered cap. All other LLW facilities in SWSA 6 are below ground. In addition, this plan includes monitoring of the Hillcut Disposal Test Facility (HDTF) in SWSA 6, even though this facility was completed prior to the data of the DOE order. In SWSA 5 North, the TRU facilities include below-grade engineered caves, high-range wells, and unlined trenches. All samples from SWSA 6 are screened for alpha and beta activity, counted for gamma-emitting isotopes, and analyzed for tritium. In addition to these analytes, samples from SWSA 5 North are analyzed for specific transuranic elements.

  3. Total quality management program planning

    SciTech Connect

    Thornton, P.T.; Spence, K.

    1994-05-01

    As government funding grows scarce, competition between the national laboratories is increasing dramatically. In this era of tougher competition, there is no for resistance to change. There must instead be a uniform commitment to improving the overall quality of our products (research and technology) and an increased focus on our customers` needs. There has been an ongoing effort to bring the principles of total quality management (TQM) to all Energy Systems employees to help them better prepare for future changes while responding to the pressures on federal budgets. The need exists for instituting a vigorous program of education and training to an understanding of the techniques needed to improve and initiate a change in organizational culture. The TQM facilitator is responsible for educating the work force on the benefits of self-managed work teams, designing a program of instruction for implementation, and thus getting TQM off the ground at the worker and first-line supervisory levels so that the benefits can flow back up. This program plan presents a conceptual model for TQM in the form of a hot air balloon. In this model, there are numerous factors which can individually and collectively impede the progress of TQM within the division and the Laboratory. When these factors are addressed and corrected, the benefits of TQM become more visible. As this occurs, it is hoped that workers and management alike will grasp the ``total quality`` concept as an acceptable agent for change and continual improvement. TQM can then rise to the occasion and take its rightful place as an integral and valid step in the Laboratory`s formula for survival.

  4. 30 CFR 722.13 - Failure to abate.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Failure to abate. 722.13 Section 722.13 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR INITIAL PROGRAM REGULATIONS ENFORCEMENT PROCEDURES § 722.13 Failure to abate. An authorized representative of the Secretary shall order cessation of...

  5. 30 CFR 722.13 - Failure to abate.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Failure to abate. 722.13 Section 722.13 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR INITIAL PROGRAM REGULATIONS ENFORCEMENT PROCEDURES § 722.13 Failure to abate. An authorized representative of the Secretary...

  6. Collaborative Strategic Planning for Older Adult Programming.

    ERIC Educational Resources Information Center

    Muzzarelli, Robert; Young, William H.

    1992-01-01

    Given the implications of current trends showing the aging of the population, continuing education programs for older adults should focus on "retirement employment." A strategic planning approach can incorporate forecasting into program development. (SK)

  7. Setting up an Asbestos Operations and Maintenance (O&M) Program

    EPA Pesticide Factsheets

    Covers steps a buidling's O&M plan should including: appointing an asbestos program manager, inspecting the building, developing a plan, and if necessary selecting and implementing larger repair or abatement projects.

  8. Guide to Vocational Program Planning. Revised.

    ERIC Educational Resources Information Center

    Virginia State Dept. of Education, Richmond. Div. of Adolescent Education.

    This revised edition of a guide to vocational program planning in Virginia is intended to be used as a principal resource for vocational program design and application and to serve as a supplement to program information provided to localities by the individual service areas. The guide is organized in eight sections, one for each program area:…

  9. Nevada Experiments and Operations Program (N Program) Management Plan

    SciTech Connect

    Nattrass, L.; Anastasio, M.R.

    2000-02-01

    This plan briefly describes the Lawrence Livermore National Laboratory (LLNL) institutional structure and how Nevada Experiments and Operations Program (N Program's) organization fits within this structure, roles and responsibilities, and management processes that govern N Program activities. This plan also serves as the Integrated Safety Management (ISM) Implementation Plan for N Program work. This plan applies to all work performed by and for LLNL that falls under the oversight of DOE/NV except LLNL activities in support of the Yucca Mountain Project Office (YMPO).

  10. Compare and Contrast Program Planning Models

    ERIC Educational Resources Information Center

    Baskas, Richard S.

    2011-01-01

    This paper will examine the differences and similarities between two program planning models, Tyler and Caffarella, to reveal their strengths and weaknesses. When adults are involved in training sessions, there are various program planning models that can be used, depending on the goal of the training session. Researchers developed these models…

  11. Instructional Program Planning for Outdoor Education.

    ERIC Educational Resources Information Center

    Garbutt, Barbara; And Others

    A guide on instructional program planning for outdoor education, prepared for Oakland County (Michigan) teachers, contains suggestions for program planning and lists information sources on suitable outdoor activities. The purpose of outdoor education is defined as being: "to enrich, vitalize and complement content areas of the school…

  12. Third report on the Oak Ridge National Laboratory Biological Monitoring and Abatement Program for White Oak Creek Watershed and the Clinch River

    SciTech Connect

    Loar, J.M.; Adams, S.M.; Bailey, R.D.

    1994-03-01

    As a condition of the National Pollutant Discharge Elimination System (NPDES) permit issued to Oak Ridge National Laboratory (ORNL) on April 1, 1985, a Biological Monitoring and Abatement Program (BMAP) was developed for White Oak Creek (WOC); selected tributaries of WOC, including Fifth Creek, First Creek, Melton Branch, and Northwest Tributary; and the Clinch River. The BMAP currently consists of six major tasks that address both radiological and nonradiological contaminants in the aquatic and terrestrial environs at ORNL. These are (1) toxicity monitoring, (2) bioaccumulation monitoring of nonradiological contaminants in aquatic biota, (3) biological indicator studies, (4) instream ecological monitoring, (5) assessment of contaminants in the terrestrial environment, and (6) radioecology of WOC and White Oak Lake (WOL). The investigation of contaminant transport, distribution, and fate in the WOC embayment-Clinch River-Watts Bar Reservoir system was originally a task of the BMAP but, in 1988, was incorporated into the Resource Conservation and Recovery Act Facility Investigation for the Clinch River, a separate study to assess offsite contamination from all three Department of Energy facilities in Oak Ridge.

  13. How much do family planning programs cost?

    PubMed

    Sparer, G; Okada, L M; Tillinghast, S

    1973-01-01

    The results of 2 cost studies on family planning programs are compared. National Analysts, Inc. studied 45 family planning programs for the program years 1968-1969. Westinghouse Population Center studied 27 family planning projects of 25 agencies for the program year 1970-1971. The Westinghouse projects were considerably larger in terms of operating costs than the National Analysts programs. Comparisons are made by way of multiple graphs and statistical tables. Per patient costs and the distribution of costs between direct medical services and indirect costs are consistent between the 2 studies. The results emphasize economies of scale and diseconomies of very large scale. From a cost basis, the ideal family planning project characteristics are: 1) a patient volume of approximately 3000; 2) a budget size of about $175,000; and 3) an institutional base. Programs with 1-site services were less costly than those with multiple sites or those using private physicians to provide the primary medical services.

  14. NASA aerospace pyrotechnically actuated systems: Program plan

    NASA Technical Reports Server (NTRS)

    Schulze, Norman R.

    1992-01-01

    The NASA Aerospace Pyrotechnically Actuated Systems (PAS) Program, a focused technology program, is being initiated to enhance the reliability, safety, and performance of pyrotechnically actuated systems. In broad terms, this Program Plan presents the approach that helps to resolve concerns raised by the NASA/DOD/DOE Aerospace Pyrotechnic Steering Committee. This Plan reflects key efforts needed in PAS technology. The resources committed to implement the Program will be identified in the Program Implementation Plan (PIP). A top level schedule is included along with major Program milestones and products. Responsibilities are defined in the PIP. The Plan identifies the goals and detailed objectives which define how those goals are to be accomplished. The Program will improve NASA's capabilities to design, develop, manufacture, and test pyrotechnically actuated systems for NASA's programs. Program benefits include the following: advanced pyrotechnic systems technology developed for NASA programs; hands-on pyrotechnic systems expertise; quick response capability to investigate and resolve pyrotechnic problems; enhanced communications and intercenter support among the technical staff; and government-industry PAS technical interchange. The PAS Program produces useful products that are of a broad-based technology nature rather than activities intended to meet specific technology objectives for individual programs. Serious problems have occurred with pyrotechnic devices although near perfect performance is demanded by users. The lack of a program to address those problems in the past is considered a serious omission. The nature of problems experienced as revealed by a survey are discussed and the origin of the program is explained.

  15. 24 Command Fire Improvement Action Program Plan

    SciTech Connect

    GRIFFIN, G.B.

    2000-12-01

    Fluor Hanford (FH) is responsible for providing support to the Department of Energy Richland Operations Office (RL) in the implementation of the Hanford Emergency Preparedness (EP) program. During fiscal year 2000, a number of program improvements were identified from various sources including a major range fire (24 Command Fire). Evaluations of the emergency preparedness program have confirmed that it currently meets all requirements and that performance of personnel involved is good, however the desire to effect continuous improvement resulted in the development of this improvement program plan. This program plan defines the activities that will be performed in order to achieve the desired performance improvements.

  16. Natural Gas Multi-Year Program Plan

    SciTech Connect

    1997-12-01

    This document comprises the Department of Energy (DOE) Natural Gas Multi-Year Program Plan, and is a follow-up to the `Natural Gas Strategic Plan and Program Crosscut Plans,` dated July 1995. DOE`s natural gas programs are aimed at simultaneously meeting our national energy needs, reducing oil imports, protecting our environment, and improving our economy. The Natural Gas Multi-Year Program Plan represents a Department-wide effort on expanded development and use of natural gas and defines Federal government and US industry roles in partnering to accomplish defined strategic goals. The four overarching goals of the Natural Gas Program are to: (1) foster development of advanced natural gas technologies, (2) encourage adoption of advanced natural gas technologies in new and existing markets, (3) support removal of policy impediments to natural gas use in new and existing markets, and (4) foster technologies and policies to maximize environmental benefits of natural gas use.

  17. Noise Abatement Materials

    NASA Technical Reports Server (NTRS)

    1986-01-01

    A former NASA employee who discovered a kind of plastic that soaked up energy, dampened vibrations, and was a good noise abatement material, founded a company to market noise deadening adhesives, sheets, panels and enclosures. Known as SMART products, they are 75-80% lighter than ordinary soundproofing material and have demonstrated a high degree of effectiveness. The company, Varian Associates, makes enclosures for high voltage terminals and other electronic system components, and easily transportable audiometric test booths.

  18. Groundwater pollution abatement

    SciTech Connect

    Fenton, D.M.; Holm, L.W.; Saunders, D.L.

    1987-05-12

    A method is described for for pollution abatement in groundwaters, comprising the steps of: drilling a series of wells into an aquifer, ahead of an advancing front of water which contains one or more contaminants. The wells are disposed along a line approximately parallel to the advancing front; and introducing, through the wells and into the aquifer, a particulate adsorbent material which can adsorb at least one contaminant.

  19. Goal programming for land use planning.

    Treesearch

    Enoch F. Bell

    1976-01-01

    A simple transformation of the linear programing model used in land use planning to a goal programing model allows the multiple goals implied by multiple use management to be explicitly recognized. This report outlines the procedure for accomplishing the transformation and discusses problems with use of goal programing. Of particular concern are the expert opinions...

  20. The Technical Assistance Program: A Program Plan.

    DTIC Science & Technology

    1985-09-01

    all de- Federal retirement system. velopments which affect rates, coverage, and enroll- (2) Medicare tax. All wages paid after December ment under the...contributions. If a Federal 𔃼) To determine the appropriae minimun rate -)f agency plans to recommend an award for a State or pay, the assignment

  1. Hazardous Waste Remedial Actions Program: Remedial Actions Planning Program Quality Assurance Program Plan

    SciTech Connect

    Not Available

    1989-04-01

    The purpose of this Plan is to describe the quality assurance (QA) requirements for the RAP Program by identifying the quality elements to be controlled and specifying how they will be controlled. The activities for which control elements will be identified include those relating to: preparation, review, and approval of plans, reports, and studies; execution of field and analytical work by subcontractors and other agents; control of subcontractors and other agents during other phases of work; and actions internal to the RAP Program to ensure proper execution of projects.

  2. Consolidated Fuel Reprocessing Program. National Program Plan FY 1984

    SciTech Connect

    Not Available

    1984-01-01

    This FY 1984 National Program Plan for the Consolidated Fuel Reprocessing Program (CFRP) provides specific guidance from the Department of Energy (DOE) for FY 1984 CFRP activities and a baseline for activities in future years. This is the second issue of the Plan, which is updated anually and summarizes program objectives, summary plans and schedules, budget allocations, contractor involvement, and interfaces with other research programs. The National Program Plan is a controlling document for the Technical Program Plan, which is prepared annually by the CFRP at Oak Ridge National Laboratory (ORNL) and is one of the hierarchical group of planning documents. The CFRP is a part of the DOE's program of research and development (R and D) on nuclear fission systems and is directed by the LMFBR Fuel Cycle Projects Division, Office of Spent Fuel Management and Reprocessing Systems at DOE-Headquarters through the Oak Ridge Operations Office (ORO). The strategy of the program is to maintain the capability to commit to a breeder option through a strong R and D program on breeder reprocessing and alternate fuels and fuel cycles in order to achieve operating and economic advantages.

  3. Consolidated Fuel Reprocessing Program: National Program Plan, FY 1983

    SciTech Connect

    Not Available

    1983-01-01

    This FY 1983 National Program Plan for the Consolidated Fuel Reprocessing Program (CFRP) provides specific guidance from the Department of Energy (DOE) for FY 1983 CFRP activities and a baseline for future year activities. This initial issue of the Plan, which will be updated annually, summarizes program objectives, summary plans and schedules, budget allocations, contractor involvement, and interfaces with other research programs. The National Program Plan is a controlling document for the Technical Program Plan, which is prepared annually by the CFRP at ORNL and is one of a hierarchical group of planning documents. The CFRP is a part of the DOE's program of research and development (R and D) on nuclear fission systems and is directed by the LMFBR Fuel Cycle Projects Division, Office of Spent Fuel Management and Reprocessing Systems at DOE-Headquarters through the Oak Ridge Operations Office (ORO). The strategy of the program is to maintain the capability to commit to a breeder option through a strong R and D program on breeder reprocessing and alternate fuels and fuel cycles to achieve operating and economic advantages.

  4. Consolidated Fuel Reprocessing Program. National Program Plan, FY 1985

    SciTech Connect

    Not Available

    1985-03-01

    This FY 1985 National Program Plan for the Consolidated Fuel Reprocessing Program (CFRP) provides specific guidance from the Department of Energy (DOE) for FY 1985 CFRP activities and a baseline for activities in future years. This is the third issue of the Plan, which is updated annually and summarizes program objectives, plans, and schedules, budget allocations, contractor involvements, and interfaces with other research programs. The National Program Plan is a controlling document for the Technical Program Plan, which is prepared annually by the CFRP at Oak Ridge National Laboratory (ORNL) and is one of a hierarchical group of planning documents. The CFRP is a part of the DOE's program of research and development (R and D) on nuclear fission systems and is directed by the LMFBR Fuel Cycle Projects Division, Office of Spent Fuel Management and Reprocessing Systems at DOE-Headquarters through the Oak Ridge Operations Office (ORO). The strategy of the program is to maintain the capability to commit to a breeder option through a strong fuel cycle R and D program and international technical exchanges.

  5. Hanford Environmental Management Program implementation plan

    SciTech Connect

    Not Available

    1988-08-01

    The Hanford Environmental Management Program (HEMP) was established to facilitate compliance with the applicable environmental statues, regulations, and standards on the Hanford Site. The HEMP provides a structured approach to achieve environmental management objectives. The Hanford Environmental Management Program Plan (HEMP Plan) was prepared as a strategic level planning document to describe the program management, technical implementation, verification, and communications activities that guide the HEMP. Four basic program objectives are identified in the HEMP Plan as follows: establish ongoing monitoring to ensure that Hanford Site operations comply with environmental requirements; attain regulatory compliance through the modification of activities; mitigate any environmental consequences; and minimize the environmental impacts of future operations at the Hanford Site. 2 refs., 24 figs., 27 tabs.

  6. Evaluation of the Navy Master Planning Program

    DTIC Science & Technology

    1976-05-01

    master planning has absorbed the additional roles of program management and public relations marketing . The Navy planner is now deeply involved in...master planning 62conducted by NAVFAC headquarters in 1972, various Navy planning directives, a " Market Survey" of NAVFAC services and customer 63...econoilic, environmental and socia -political impli- cations. -47 - NOTES: PART I I Department of the Navy, Naval Facilities Engineering Command, "Command

  7. Quality assurance program plan for Building 327

    SciTech Connect

    Tanke, J.M.

    1997-05-22

    This Quality Assurance Program Plan (QAPP) provides an overview of the quality assurance program for Building 327. The program applies to the facility safety structures, systems, and components and to activities that could affect safety structures, systems, and components. Adherence to the quality assurance program ensures the following: US Department of Energy missions and objectives are effectively accomplished; Products and services are safe, reliable, and meet or exceed the requirements and expectations of the user; Hazards to the public, to Hanford Site and facility workers, and to the environment are minimized. The format of this Quality Assurance Program Plan is structured to parallel that of 10 CFR 83 0.120, Quality Assurance Requirements. This Quality Assurance Program Plan (QAPP) provides information on how the Quality Assurance Program is implemented for the 324 Building B-Cell Safety Cleanout Project (BCCP). This QAPP is responsive to the Westinghouse Hanford Company Quality Assurance Program and Implementation Plan, WHC-SP 113 1, for 10 CFR 830.120, Nuclear Safety Management, Quality Assurance Requirements; and DOE Order 5700.6C, Quality Assurance. This QAPP supersedes PNNL PNL-MA-70 QAP Quality Assurance Plan No. WTC-050 Rev. 2, issue date May 3, 1996.

  8. Building Technologies Program Multi-Year Program Plan Program Portfolio Management 2008

    SciTech Connect

    None, None

    2008-01-01

    Building Technologies Program Multi-Year Program Plan 2008 for program portfolio management, including the program portfolio management process, program analysis, performance assessment, stakeholder interactions, and cross-cutting issues.

  9. State Plans for Implementing Programs of Study

    ERIC Educational Resources Information Center

    Lewis, Morgan V.; Overman, Laura

    2008-01-01

    This article examines how the states plan to implement the Programs of Study (POS) that were mandated by the 2006 reauthorization of the federal legislation for career and technical education. A coding system was developed for summarizing the methods described in the plans of all 50 states, the District of Columbia, Guam, and the Virgin Islands.…

  10. Tank waste remediation system program plan

    SciTech Connect

    Powell, R.W.

    1998-01-05

    This program plan establishes the framework for conduct of the Tank Waste Remediation System (TWRS) Project. The plan focuses on the TWRS Retrieval and Disposal Mission and is specifically intended to support the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing firm contracts for waste immobilization.

  11. Toward a More Comprehensive Career Planning Program.

    ERIC Educational Resources Information Center

    Cohen, Stephen L.; Meyer, Herbert H.

    1979-01-01

    Suggests procedures and techniques for successful organizational human resources and career planning programs, featuring the human resource inventory and assessment center approach for personnel judged to have managerial potential. Includes a chart of the proposed career planning model for nonmanagement and lower-management personnel. (MF)

  12. State Plans for Implementing Programs of Study

    ERIC Educational Resources Information Center

    Lewis, Morgan V.; Overman, Laura

    2008-01-01

    This article examines how the states plan to implement the Programs of Study (POS) that were mandated by the 2006 reauthorization of the federal legislation for career and technical education. A coding system was developed for summarizing the methods described in the plans of all 50 states, the District of Columbia, Guam, and the Virgin Islands.…

  13. Wind Shear radar program future plans

    NASA Technical Reports Server (NTRS)

    Robertson, Roy E.

    1991-01-01

    The status of the Windshear Radar Program at the Collins Air Transport Division of Rockwell International is given in viewgraph form. Topics covered include goals, modifications to the WXR-700 system, flight test plans, technical approaches, design considerations, system considerations, certification, and future plans.

  14. Tank waste remediation system environmental program plan

    SciTech Connect

    Borneman, L.E.

    1998-01-09

    This Environmental Program Plan has been developed in support of the Integrated Environmental, Safety and Health Management System and consistent with the goals of DOE/RL-96-50, Hanford Strategic Plan (RL 1996a), and the specifications and guidance for ANSI/ISO 14001-1996, Environmental Management Systems Specification with guidance for use (ANSI/ISO 1996).

  15. 29 CFR 4208.4 - Conditions for abatement.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... MULTIEMPLOYER PLANS REDUCTION OR WAIVER OF PARTIAL WITHDRAWAL LIABILITY § 4208.4 Conditions for abatement. (a... partial withdrawal (other than delinquent payments) for plan years beginning after the second consecutive... with respect to that partial withdrawal (other than delinquent payments) for plan years beginning...

  16. Preretirement Programs within Service Firms: Existing and Planned Programs.

    ERIC Educational Resources Information Center

    Siegel, Sidney R.; Rives, Janet M.

    1980-01-01

    A study of 300 nonmanufacturing firms' current and projected preretirement programs indicated that (1) personnel departments have primary responsibility for existing programs, (2) focus is changing from financial planning to psychological counseling, and (3) such programs benefit the company as well as the employee. (SK)

  17. Planning integration FY 1996 program plan. Revision 1

    SciTech Connect

    1995-09-01

    This Multi-Year Program Plan (MAP) Planning Integration Program, Work Breakdown Structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes an agreement between RL and the performing contractors for the work to be performed. It was prepared by Westinghouse Hanford Company (WHC) and Pacific Northwest Laboratory (PNL). The MYPPs for the Hanford Site programs are to provide a picture from fiscal year (FY) 1996 through FY 2002. At RL Planning and Integration Division (PID) direction, only the FY 1996 Planning Integration Program work scope has been planned and presented in this MAP. Only those known significant activities which occur after FY 1996 are portrayed in this MAP. This is due to the uncertainty of who will be accomplishing what work scope when, following the award of the Management and Integration (M&I) contract.

  18. Program Access Master Planning Guide.

    ERIC Educational Resources Information Center

    California State and Consumer Services Agency, Sacramento. Office of Statewide Compliance Coordination.

    Designed for use by California state departments, this guide is a standardized approach to developing a master plan to ensure that persons with disabilities who are candidates or applicants for employment, employees, or recipients of state services are provided equal opportunities and fair treatment. It outlines a six-step process to evaluate a…

  19. Pupil Transportation Safety Program Plan.

    ERIC Educational Resources Information Center

    Delahanty, Joseph F.; And Others

    This study has been undertaken to assess the magnitude of the school bus safety problem and to develop a plan to improve pupil transportation safety. The resulting report provides estimates of school bus population and daily usage, gives an account of injuries and fatalities that occur annually, and compares the safety records of school buses to…

  20. Family planning programs and fertility decline.

    PubMed

    Cuca, R

    1980-01-01

    A recently completed World Bank statistical study of family planning in 63 developing countries indicated that countries which experienced a large decline in birth rates between 1960-1977 were more likely to have a family planning program, an official population policy aimed at decreasing the birth rate, and a relatively high level of development than countries which experienced smaller or no decline in birth rates. The 65 countries represented 95% of the population of the developing world. Birth rate declines of 10% or more between 1960-1977 were experienced by: 1) 10 of the 26 countries which had a family planning program and a policy aimed at reducing the birth rate; 2) 6 of the 19 countries which had a family planning program but lacked clearly defined population objectives; and 3) 2 of the 18 countries without any population policy or program. Furthermore, the implementation of a family planning program and the adoption of a population policy were directly related to the development level of the country. This finding suggested that countries need to reach a certain level of development before they have the capacity to develop population programs and policies. When a country is sufficiently advanced to collect population data, awareness of population problems increases and they are more likely to adopt a population policy. In addition, government efficiency increases as development proceeds and governments must have a certain level of efficiency before they can implement effective programs.

  1. Emission Abatement System

    DOEpatents

    Bromberg, Leslie; Cohn, Daniel R.; Rabinovich, Alexander

    2003-05-13

    Emission abatement system. The system includes a source of emissions and a catalyst for receiving the emissions. Suitable catalysts are absorber catalysts and selective catalytic reduction catalysts. A plasma fuel converter generates a reducing gas from a fuel source and is connected to deliver the reducing gas into contact with the absorber catalyst for regenerating the catalyst. A preferred reducing gas is a hydrogen rich gas and a preferred plasma fuel converter is a plasmatron. It is also preferred that the absorber catalyst be adapted for absorbing NO.sub.x.

  2. The 1989 long-range program plan

    NASA Technical Reports Server (NTRS)

    1988-01-01

    The President's National Space Policy of 1988 reaffirms that space activities serve a variety of vital national goals and objectives, including the strengthening of U.S. scientific, technological, political, economic, and international leadership. The new policy stresses that civil space activities contribute significantly to enhancing America's world leadership. Goals and objectives must be defined and redefined, and each advance toward a given objective must be viewed as a potential building block for future programs. This important evolutionary process for research and development is reflected, describing NASA's program planning for FY89 and later years. This plan outlines the direction of NASA's future activities by discussing goals, objectives, current programs, and plans for the future. The 1989 plan is consistent with national policy for both space and aeronautics, and with the FY89 budget that the President submitted to Congress in February 1988.

  3. Planning and Implementing Career Education Programs: Perspectives.

    ERIC Educational Resources Information Center

    Crim, Alonzo A.; And Others

    The collection of six papers offers perspectives on planning and implementing career education programs. The first paper, the Introduction (David Goodwin), deals with program implementation. The second paper, Priorities in Career Education (Alonzo A. Crim), describes the historical origins of career education in the Atlanta school system with a…

  4. Engineering Technology Programs. Preliminary Curriculum Planning Guide.

    ERIC Educational Resources Information Center

    Center for Occupational Research and Development, Inc., Waco, TX.

    Developed as a resource to assist in a major revision underway in Georgia area technical schools to change curricula for preparing engineering technicians, this preliminary program-planning guide describes curriculum structures for specialized programs in three major areas--electronics, electromechanics, and mechanics. The handbook, which is…

  5. Effective Comprehensive Prevention Programs: A Planning Guide.

    ERIC Educational Resources Information Center

    Duncan, Andrew N.; Stephens-Burden, Stevie; Bickel, Ann

    This guidebook is designed to be used in implementing comprehensive prevention programs for children and youth in schools and communities. The primary goals of this planning guide are: provide educators and communities with a prevention model that will help them facilitate the implementation of effective comprehensive programs; provide a framework…

  6. Agricultural Products: Program Planning Guide: Volume 4.

    ERIC Educational Resources Information Center

    Welton, Richard; Robb, Sam

    The program planning guide for agricultural products was written to assist Applied Biological and Agricultural Occupations (ABAO) teachers in enriching existing programs and/or to provide the basis for expansion of offerings to include additional materials for the cluster areas of meat and meat byproducts, dairy processing, fruit and vegetable…

  7. Forestry: Program Planning Guide: Volume 7.

    ERIC Educational Resources Information Center

    Roth, Paul L.; And Others

    The program planning guide for forestry was written to assist Applied Biological and Agricultural Occupations (ABAO) teachers in enriching existing programs and/or to provide the basis for expansion of offerings to include additional materials for the cluster areas of forests, forest protection, logging, wood utilization, recreation, and special…

  8. A Guide to Planning Alcoholism Treatment Programs.

    ERIC Educational Resources Information Center

    McGough, Dixie P.; Hindman, Margaret H.

    This guide contains information from the alcoholism literature and from interviews with people in state alcoholism agencies, major professional associations, and public and private service programs. It is designed to help readers plan and develop community alcoholism programs by providing an overview of the many considerations involved in starting…

  9. Ornamental Horticulture: Program Planning Guide: Volume 5.

    ERIC Educational Resources Information Center

    Ross, Roger R.; Stitt, Thomas R.

    The program planning guide for ornamental horticulture was written to assist Applied Biological and Agricultural Occupations (ABAO) teachers in enriching existing programs and/or to provide the basis for expansion of offerings to include additional materials for the cluster areas of arboriculture, floriculture, greenhouse operation and management,…

  10. Planning an Education Program for Dental Hygienists.

    ERIC Educational Resources Information Center

    Bruce, Harry W.; And Others

    Intended for adaptation to local situations, the handbook was prepared to assist interested groups to determine whether a dental hygiene educational program is needed and feasible, and to supply basic guidelines for planning. The introduction deals with dental hygiene in preventive dentistry and the historical development of educational programs.…

  11. Quality assurance program plan fuel supply shutdown

    SciTech Connect

    Metcalf, I.L.

    1998-09-21

    This Quality Assurance Program plan (QAPP) describes how the Fuel Supply Shutdown (FSS) project organization implements the quality assurance requirements of HNF-MP-599, Project Hanford Quality Assurance Program Description (QAPD) and the B and W Hanford Company Quality Assurance Program Plan (QAPP), FSP-MP-004. The QAPP applies to facility structures, systems, and components and to activities (e.g., design, procurement, testing, operations, maintenance, etc.) that could affect structures, systems, and components. This QAPP also provides a roadmap of applicable Project Hanford Policies and Procedures (PHPP) which may be utilized by the FSS project organization to implement the requirements of this QAPP.

  12. TROPOSPHERIC AEROSOL PROGRAM, PROGRAM PLAN, MARCH 2001

    SciTech Connect

    SCHWARTZ,S.E.; LUNN,P.

    2001-03-01

    The goal of Tropospheric Aerosol Program (TAP) will be to develop the fundamental scientific understanding required to construct tools for simulating the life cycle of tropospheric aerosols--the processes controlling their mass loading, composition, and microphysical properties, all as a function of time, location, and altitude. The TAP approach to achieving this goal will be by conducting closely linked field, modeling, laboratory, and theoretical studies focused on the processes controlling formation, growth, transport, and deposition of tropospheric aerosols. This understanding will be represented in models suitable for describing these processes on a variety of geographical scales; evaluation of these models will be a key component of TAP field activities. In carrying out these tasks TAP will work closely with other programs in DOE and in other Federal and state agencies, and with the private sector. A forum to directly work with our counterparts in industry to ensure that the results of this research are translated into products that are useful to that community will be provided by NARSTO (formerly the North American Research Strategy on Tropospheric Ozone), a public/private partnership, whose membership spans government, the utilities, industry, and university researchers in Mexico, the US, and Canada.

  13. River Protection Project (RPP) Environmental Program Plan

    SciTech Connect

    POWELL, P.A.

    2000-03-29

    This Environmental Program Plan was developed in support of the Integrated Environment, Safety, and Health Management System Plan (ISMS) (RPP-MP-003), which establishes a single, defined environmental, safety, and health management system that integrates requirements into the work planning and execution processes to protect workers, the public, and the environment. The ISMS also provides mechanisms for increasing worker involvement in work planning, including hazard and environmental impact identification, analysis, and control; work execution; and feedback/improvement processes. The ISMS plan consists of six core functions. Each section of this plan describes the activities of the River Protection Project (RPP) (formerly known as the Tank Waste Remediation System) Environmental organization according to the following core functions: Establish Environmental Policy; Define the Scope of Work; Identify Hazards, Environmental Impacts, and Requirements; Analyze Hazards and Environmental Impacts and Implement Controls; Perform Work within Controls; and Provide Feedback and Continuous Improvement.

  14. Natural gas strategic plan and program crosscut plans

    SciTech Connect

    1995-06-01

    The natural gas strategic plan recognizes the challenges and opportunities facing increased U.S. natural gas use. Focus areas of research include natural gas supply, delivery, and storage, power generation, industrial, residential and commercial, natural gas vehicles, and the environment. Historical aspects, mission, situation analysis, technology trends, strategic issues, performance indicators, technology program overviews, and forecasting in the above areas are described.

  15. 29 CFR 4208.5 - Withdrawal liability payments during pendency of abatement determination.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... § 4208.5 Withdrawal liability payments during pendency of abatement determination. (a) Bond/Escrow. An... to, or establish an escrow account for, the plan that satisfies the requirements of paragraph (b) of... second consecutive plan year. An employer that applies for abatement and neither provides a bond/escrow...

  16. 29 CFR 4208.5 - Withdrawal liability payments during pendency of abatement determination.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... § 4208.5 Withdrawal liability payments during pendency of abatement determination. (a) Bond/Escrow. An... to, or establish an escrow account for, the plan that satisfies the requirements of paragraph (b) of... second consecutive plan year. An employer that applies for abatement and neither provides a bond/escrow...

  17. 29 CFR 4208.5 - Withdrawal liability payments during pendency of abatement determination.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... § 4208.5 Withdrawal liability payments during pendency of abatement determination. (a) Bond/Escrow. An... to, or establish an escrow account for, the plan that satisfies the requirements of paragraph (b) of... second consecutive plan year. An employer that applies for abatement and neither provides a bond/escrow...

  18. 29 CFR 4208.5 - Withdrawal liability payments during pendency of abatement determination.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... § 4208.5 Withdrawal liability payments during pendency of abatement determination. (a) Bond/Escrow. An... to, or establish an escrow account for, the plan that satisfies the requirements of paragraph (b) of... second consecutive plan year. An employer that applies for abatement and neither provides a bond/escrow...

  19. 23 CFR 450.308 - Funding for transportation planning and unified planning work programs.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Funding for transportation planning and unified planning... TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Metropolitan Transportation Planning and Programming § 450.308 Funding for transportation planning and unified planning work programs. (a)...

  20. Information Technology Standards Program management plan

    SciTech Connect

    1998-05-01

    This document presents a logical and realistic plan to implement the Information Technology (IT) Standards Program throughout the Department of Energy (DOE). It was developed by DOE Chief Information Officer (CIO) staff, with participation from many other individuals throughout the DOE complex. The DOE IT Standards Program coordinates IT standards activities Department-wide, including implementation of standards to support the DOE Information Architecture. The Program is voluntary, participatory, and consensus-based. The intent is to enable accomplishment of the DOE mission, and the Program is applicable to all DOE elements, both Federal and contractor. The purpose of this document is to describe the key elements of the DOE IT Standards Program.

  1. Integrated propulsion technology demonstrator. Program plan

    NASA Technical Reports Server (NTRS)

    1994-01-01

    NASA and Rockwell have embarked on a cooperative agreement to define, develop, fabricate, and operate an integrated propulsion technology demonstrator (IPTD) for the purpose of validating design, process, and technology improvements of launch vehicle propulsion systems. This program, a result of NRA8-11, Task Area 1 A, is jointly funded by both NASA and Rockwell and is sponsored by the Reusable Launch Vehicle office at NASA Marshall Space flight Center. This program plan provides to the joint NASA/Rockwell integrated propulsion technology demonstrator (IPTD) team a description of the activities within tasks / sub tasks and associated schedules required to successfully achieve program objectives. This document also defines the cost elements and manpower allocations for each sub task for purpose of program control. This plan is updated periodically by developing greater depth of direction for outyear tasks as the program matures. Updating is accomplished by adding revisions to existing pages or attaching page revisions to this plan. In either case, revisions will be identified by appropriate highlighting of the change, or specifying a revision page through the use of footnotes on the bottom right of each change page. Authorization for the change is provided by the principal investigators to maintain control of this program plan document and IPTD program activities.

  2. Total quality management -- Remedial actions planning program

    SciTech Connect

    Petty, J.L.; Horne, T.E.

    1989-01-01

    This paper describes the management approach being taken within the Hazardous Waste Remedial Actions Program (HAZWRAP) Support Contractor Office (SCO) to ensure quality of services in a highly competitive waste management environment. An overview is presented of the contractor support role assigned to Martin Marietta Energy Systems, Inc., by the Department of Energy (DOE) national program for managing hazardous waste. The HAZWRAP SCO mission, organizational structure, and major programs are outlined, with emphasis on waste management planning for the DOE Work for Others (WFO) Program. The HAZWRAP SCO provides waste management technical support, via interagency agreements between DOE and various Department of Defense (DOD) agencies for DOD sponsors planning remedial response actions. The remainder of the paper focuses on how the concept of Total Quality Management is applied to the HAZWRAP Remedial Actions Planning (RAP) Program. The management challenge is to achieve quality on a ''system'' basis where all functional elements of program management synergistically contribute to the total quality of the effort. The quality assurance (QA) program requirements applied to the RAP Program and its subcontractors are discussed. The application of management principles in the areas of program management, procurement, and QA to achieve total quality is presented. 3 refs.

  3. WSC Bridge Program Planning Guide

    ERIC Educational Resources Information Center

    Jenkins, Davis

    2004-01-01

    Increasingly jobs that pay more than subsistence wages and offer opportunities for career advancement require at least some training beyond high school, even at the entry level. Bridge training programs are designed to prepare individuals without the requisite basic skills for postsecondary training leading to career-path employment and further…

  4. Agricultural Occupations Program Planning Guide.

    ERIC Educational Resources Information Center

    Hemp, Paul E.; Mayer, Leon

    The major program objectives of agricultural occupations courses are (1) to develop agricultural competencies needed by individuals engaged in or preparing to engage in production agriculture, and in agricultural occupations other than production agriculture; (2) to develop an understanding of the career opportunities in agriculture; (3) to…

  5. Space radiation health program plan

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The Space Radiation Health Program intends to establish the scientific basis for the radiation protection of humans engaged in the exploration of space, with particular emphasis on the establishment of a firm knowledge base to support cancer risk assessment for future planetary exploration. This document sets forth the technical and management components involved in the implementation of the Space Radiation Health Program, which is a major part of the Life Sciences Division (LSD) effort in the Office of Space Science and Applications (OSSA) at the National Aeronautics and Space Administration (NASA). For the purpose of implementing this program, the Life Sciences Division supports scientific research into the fundamental mechanisms of radiation effects on living systems and the interaction of radiation with cells, tissues, and organs, and the development of instruments and processes for measuring radiation and its effects. The Life Sciences Division supports researchers at universities, NASA field centers, non-profit research institutes and national laboratories; establishes interagency agreements for cooperative use and development of facilities; and conducts a space-based research program using available and future spaceflight vehicles.

  6. Nutrient abatement potential and abatement costs of waste water treatment plants in the Baltic Sea region.

    PubMed

    Hautakangas, Sami; Ollikainen, Markku; Aarnos, Kari; Rantanen, Pirjo

    2014-04-01

    We assess the physical potential to reduce nutrient loads from waste water treatment plants in the Baltic Sea region and determine the costs of abating nutrients based on the estimated potential. We take a sample of waste water treatment plants of different size classes and generalize its properties to the whole population of waste water treatment plants. Based on a detailed investment and operational cost data on actual plants, we develop the total and marginal abatement cost functions for both nutrients. To our knowledge, our study is the first of its kind; there is no other study on this issue which would take advantage of detailed data on waste water treatment plants at this extent. We demonstrate that the reduction potential of nutrients is huge in waste water treatment plants. Increasing the abatement in waste water treatment plants can result in 70 % of the Baltic Sea Action Plan nitrogen reduction target and 80 % of the Baltic Sea Action Plan phosphorus reduction target. Another good finding is that the costs of reducing both nutrients are much lower than previously thought. The large reduction of nitrogen would cost 670 million euros and of phosphorus 150 million euros. We show that especially for phosphorus the abatement costs in agriculture would be much higher than in waste water treatment plants.

  7. Building Technologies Program Multi-Year Program Plan Program Overview 2008

    SciTech Connect

    None, None

    2008-01-01

    Building Technologies Program Multi-Year Program Plan Program Overview 2008, including market overview and federal role, program vision, mission, design and structure, and goals and multi-year targets.

  8. Biological abatement of cellulase inhibitors

    USDA-ARS?s Scientific Manuscript database

    Bio-abatement uses a fungus to metabolize and remove fermentation inhibitors. To determine whether bio-abatement could alleviate enzyme inhibitor effects observed in biomass liquors after pretreatment, corn stover at 10% (w/v) solids was pretreated with either dilute acid or liquid hot water. The ...

  9. Microgravity Program strategic plan, 1991

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The all encompassing objective of the NASA Microgravity Program is the use of space as a lab to conduct research and development. The on-orbit microgravity environment, with its substantially reduced buoyancy forces, hydrostatic pressures, and sedimentation, enables the conduction of scientific studies not possible on Earth. This environment allows processes to be isolated and controlled with an accuracy that cannot be obtained in the terrestrial environment. The Microgravity Science and Applications Div. has defined three major science categories in order to develop a program structure: fundamental science, including the study of the behavior of fluids, transport phenomena, condensed matter physics, and combustion science; materials science, including electronic and photonic materials, metals and alloys, and glasses and ceramics; and biotechnology, focusing on macromolecular crystal growth as well as cell and molecular science. Experiments in these areas seek to provide observations of complex phenomena and measurements of physical attributes with a precision that is enabled by the microgravity environment.

  10. MHD Program Plan, FY 1992

    NASA Astrophysics Data System (ADS)

    1991-10-01

    The current MHD program being implemented is a result of a consensus established in public meetings held by the Department of Energy in 1984. Essential elements of the current program include the following: (1) develop technical and environmental data for the integrated MHD topping cycle system through POC testing (1,000 hours); (2) develop technical and environmental data for the integrated MHD bottoming cycle sub system through POC testing (4,000 hours); (3) design, construct, and operate a seed regeneration POC facility (SRPF) capable of processing spent seed materials from the MHD bottoming cycle; (4) prepare conceptual designs for a site specific MHD retrofit plant; and (5) continue system studies and supporting research necessary for system testing. The current MHD program continues to be directed toward coal fired power plant applications, both stand-alone and retrofit. Development of a plant should enhance the attractiveness of MHD for applications other than electrical power. MHD may find application in electrical energy intensive industries and in the defense sector.

  11. Hanford Environmental Management Program plan; Revision 1

    SciTech Connect

    DeFigh-Price, C.

    1990-08-01

    The Hanford Environmental Management Program (HEMP) was established in November 1986 by the US Department of Energy-Richland Operations Office. Westinghouse Hanford Company has been assigned responsibility to manage this program. The program`s goal is to integrate environmental activities such as regulatory reporting and planning and to facilitate compliance with environmental regulations. Key activities include preparing and/or coordinating waste management and environmental restoration site-wide planning documents, maintaining the Waste Inventory Data System, coordinating site-wide regulatory reporting (SARA Title III, Dangerous Waste Report, etc.), Tri-Party Agreement Administration and Base (nonprogram specific) regulatory permitting and National Environmental Policy Act activities. Fiscal year (FY) 1991 is the first year this activity will be directly funded. This document describes accomplishments in FY 1990, the scope of work funded by this program for FY 1991, the prioritized tasks covered, and the management structure in place. 16 refs., 4 figs., 1 tab.

  12. Ocean Thermal Energy Conversion Program Management Plan

    SciTech Connect

    Combs, R E

    1980-01-01

    The Office of the Associate Laboratory Director for Energy and Environmental Technology has established the OTEC Program Management Office to be responsible for the ANL-assigned tasks of the OTEC Program under DOE's Chicago Operations and Regional Office (DOE/CORO). The ANL OTEC Program Management Plan is essentially a management-by-objective plan. The principal objective of the program is to provide lead technical support to CORO in its capacity as manager of the DOE power-system program. The Argonne OTEC Program is divided into three components: the first deals with development of heat exchangers and other components of OTEC power systems, the second with development of biofouling counter-measures and corrosion-resistant materials for these components in seawater service, and the third with environmental and climatic impacts of OTEC power-system operation. The essential points of the Management Plan are summarized, and the OTEC Program is described. The organization of the OTEC Program at ANL is described including the functions, responsibilities, and authorities of the organizational groupings. The system and policies necessary for the support and control functions within the organization are discussed. These functions cross organizational lines, in that they are common to all of the organization groups. Also included are requirements for internal and external reports.

  13. Tank waste remediation system program plan

    SciTech Connect

    Powell, R.W.

    1998-01-09

    This TWRS Program plan presents the planning requirements and schedules and management strategies and policies for accomplishing the TWRS Project mission. It defines the systems and practices used to establish consistency for business practices, engineering, physical configuration and facility documentation, and to maintain this consistency throughout the program life cycle, particularly as changes are made. Specifically, this plan defines the following: Mission needs and requirements (what must be done and when must it be done); Technical objectives/approach (how well must it be done); Organizational structure and philosophy (roles, responsibilities, and interfaces); and Operational methods (objectives and how work is to be conducted in both management and technical areas). The plan focuses on the TWRS Retrieval and Disposal Mission and supports the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing contracts with private contractors for the treatment (immobilization) of Hanford tank high-level radioactive waste.

  14. Environmental Restoration Program Document Control Plan

    SciTech Connect

    Montgomery, L.M.

    1993-09-01

    This Environmental Restoration (ER) Program Document Control Plan has been developed to comply with the document control system requirements of the US Department of Energy, Richland Operations Office (RL), the Hanford Federal Facility and the ER Program. One of the five components, or summary subprojects, of the Environmental Restoration (ER) Program is program management and support, which includes both management systems development and information and data management. Efforts within the management systems development area include the creation of a document control plan. Westinghouse Hanford Company (WHC) has developed and established an overall document control system that governs the methods by which all WHC documents are generated, maintained, and disposed of. The ER Program performing organizations within WHC utilize the established WHC document control systems to the maximum extent possible. These systems are discussed in Chapters 3.0 and 4.0 of this plan. In addition, this plan describes the documents that require control within the ER Program and how they will be controlled.

  15. Building Technologies Program Planning Summary

    SciTech Connect

    none,

    2009-11-01

    The U.S. Department of Energy’s (DOE) Building Technologies Program (BTP) works in partnership with industry, state, municipal, and other federal organizations to achieve the goals of marketable net-zero energy buildings. To carry out its mission, BTP involves builders; appliance, window, lighting, operational systems, and component manufacturers; and end users in setting the program’s research priorities. These groups advise and help guide BTP through implementing, deploying, and standardizing new technologies, equipment, and processes being developed and tested in DOE’s national laboratories and in real-world applications in many U.S. communities.

  16. Program overview of peacekeeper flight test planning

    NASA Astrophysics Data System (ADS)

    Woodbury, S.; Gorman, R. G.

    1983-11-01

    This paper will present an overview of the planning involved in designing the flight test program for the Peacekeeper weapon system. Items to be discussed are: the Peacekeeper missile and launch facilities description; the overall flight test objectives progression from first flight through initial operational capability (IOC); mission design and data acquisition; impact of range safety constraints; requirement for development of new range sensors; program plans for mission evaluation and the integration of test reports; and a short discussion of the universal documentation system (UDS).

  17. NASA program planning on nuclear electric propulsion

    NASA Technical Reports Server (NTRS)

    Bennett, Gary L.; Miller, Thomas J.

    1992-01-01

    As part of the focused technology planning for future NASA space science and exploration missions, NASA has initiated a focused technology program to develop the technologies for nuclear electric propulsion and nuclear thermal propulsion. Beginning in 1990, NASA began a series of interagency planning workshops and meetings to identify key technologies and program priorities for nuclear propulsion. The high-priority, near-term technologies that must be developed to make NEP operational for space exploration include scaling thrusters to higher power, developing high-temperature power processing units, and developing high power, low-mass, long-lived nuclear reactors.

  18. NASA program planning on nuclear electric propulsion

    SciTech Connect

    Bennett, G.L.; Miller, T.J. NASA, Lewis Research Center, Cleveland, OH )

    1992-03-01

    As part of the focused technology planning for future NASA space science and exploration missions, NASA has initiated a focused technology program to develop the technologies for nuclear electric propulsion and nuclear thermal propulsion. Beginning in 1990, NASA began a series of interagency planning workshops and meetings to identify key technologies and program priorities for nuclear propulsion. The high-priority, near-term technologies that must be developed to make NEP operational for space exploration include scaling thrusters to higher power, developing high-temperature power processing units, and developing high power, low-mass, long-lived nuclear reactors. 28 refs.

  19. NASA: 1986 long-range program plan

    NASA Technical Reports Server (NTRS)

    1985-01-01

    For the years beyond FY 1986, the plan consists of activities that are technologically possible and considered to be in the national interest. Its implementation will ensure logical and continued progress in reaching the Nation's goals in aeronautics and space, consistent with the responsibilities assigned NASA by the National Aeronautics and Space Act of 1958, as amended. The major features of the programs are described in detail and the nature of the aeronautics and space programs beyond the year 2000 are projected. The abbreviations and acronyms that appear in this report are listed. The status of NASA's plans are summarized at the time of its preparation.

  20. Human health risks associated with asbestos abatement

    SciTech Connect

    Chrostowski, P.C.; Foster, S.A.; Anderson, E.L. )

    1991-09-01

    Upperbound lifetime excess cancer risks were calculated for activities associated with asbestos abatement using a risk assessment framework developed for EPA's Superfund program. It was found that removals were associated with cancer risks to workers which were often greater than the commonly accepted cancer risk of 1 {times} 10(-6), although lower than occupational exposure limits associated with risks of 1 {times} 10(-3). Removals had little effect in reducing risk to school populations. Risks to teachers and students in school buildings containing asbestos were approximately the same as risks associated with exposure to ambient asbestos by the general public and were below the levels typically of concern to regulatory agencies. During abatement, however, there were increased risks to both workers and nearby individuals. Careless, everyday building maintenance generated the greatest risk to workers followed by removals and encapsulation. If asbestos abatement was judged by the risk criteria applied to EPA's Superfund program, the no-action alternative would likely be selected in preference to removal in a majority of cases. These conclusions should only be interpreted within the context of an overall asbestos risk management program, which includes consideration of specific fiber types and sizes, sampling and analytical limitations, physical condition of asbestos-containing material, episodic peak exposures, and the number of people potentially exposed.

  1. Lightweight materials for transportation: Program plan

    SciTech Connect

    Not Available

    1993-07-01

    This Program Plan has been prepared by the Office of Transportation Materials in response to a request by the House Committee on Appropriations. It recognizes that a significant commitment to long-term, stable materials research and development (R&D) is required to realize the benefits of lighter weight vehicles, including economic, environmental and energy related benefits. Extensive input was obtained from the major US automakers and from representative materials and component suppliers. Considerable interaction with the key members of the US Automotive Materials Partnership (USAMP) has ensured consistency of technical direction. The program will support R&D activity at industrial sites through competitively bid subcontracts with cost sharing anticipated at 30--50%, with the higher amounts in process scale-up and manufacturing technology development. The recommended LWM Program will enable industry to develop pecessary technology by utilizing their capabilities as well as accessing supporting technology at national laboratories, universities, ongoing program activity at NASA, DoD, DOT, NIST, etc., and thereby leverage industry resources through integrated team approaches. Many individual program efforts are currently in place that address small portions of the overall needs of the LWM Program, both within DOE and in other agencies. Cognizance of these and overall integration of research activities are planned as significant program management tasks. Because of the international nature of the automobile business, benchmarking of foreign technology and tracking of worldwide developments are also key program elements.

  2. Guide for Program Planning: Medical Laboratory Technician.

    ERIC Educational Resources Information Center

    Kahler, Carol, Ed.; And Others

    Prepared by the American Association of Junior Colleges and the National Council on Medical Technology Education, this guide discusses programs for career-entry supportive medical laboratory personnel which have been cooperatively planned by junior college personnel and the medical community, particularly pathologists and medical technologists.…

  3. Planning Programming Budgeting System: Fiscal Year 1971.

    ERIC Educational Resources Information Center

    El Dorado County Board of Education, Placerville, CA.

    To increase the efficiency of human and financial resource allocations, the El Dorado County, California, Office of Education initiated a planning, programing, budgeting system (PPBS). This document is a progress report on the effectiveness of the system after one year of operation. It contains (1) a statement on goals, (2) charts of the program…

  4. Systemwide Academic Program Review: The Florida Plan.

    ERIC Educational Resources Information Center

    Hill, Joan A.; And Others

    The Florida Plan for systemwide academic program review is detailed in this report. Factors leading to the initiation of systemwide review, including population changes and the changing role of the predominantly black Florida A&M University, are discussed. The design and scope of the review process are explained and selection of consultants to…

  5. Focus groups: a program planning technique.

    PubMed

    DesRosier, M B; Zellers, K C

    1989-03-01

    To successfully develop nurse retention programs, a thorough organizational analysis, including the identification of problems, is necessary. Used as a management tool, focus groups that use the organization's nursing staff provide a unique method of data collection for identifying problems that now exist in the organization. The authors discuss this method for obtaining information for strategic planning for retention of nurses.

  6. Systemwide Academic Program Review: The Florida Plan.

    ERIC Educational Resources Information Center

    Hill, Joan A.; And Others

    The Florida Plan for systemwide academic program review is detailed in this report. Factors leading to the initiation of systemwide review, including population changes and the changing role of the predominantly black Florida A&M University, are discussed. The design and scope of the review process are explained and selection of consultants to…

  7. Programming and Planning in Early Childhood Settings.

    ERIC Educational Resources Information Center

    Arthur, Leonie; And Others

    This book presents for discussion principles and issues that encourage early childhood educators to evaluate their current approaches to programming and planning for young chidren with emphasis on the individual child. The book offers the opportunity to affirm the practice of developmentally appropriate procedures and to suggest directions for…

  8. Life Planning Education: A Youth Development Program.

    ERIC Educational Resources Information Center

    Center for Population Options, Washington, DC.

    This document presents the curriculum guide for Life Planning Education, a youth development program that focuses on two of the most important tasks teenagers face: preparing for the world of work and dealing with their own sexual and reproductive development, feelings, and behaviors. These two tasks are integrated in the curriculum in a way that…

  9. VCE testbed program planning and definition study

    NASA Technical Reports Server (NTRS)

    Westmoreland, J. S.; Godston, J.

    1978-01-01

    The flight definition of the Variable Stream Control Engine (VSCE) was updated to reflect design improvements in the two key components: (1) the low emissions duct burner, and (2) the coannular exhaust nozzle. The testbed design was defined and plans for the overall program were formulated. The effect of these improvements was evaluated for performance, emissions, noise, weight, and length. For experimental large scale testing of the duct burner and coannular nozzle, a design definition of the VCE testbed configuration was made. This included selecting the core engine, determining instrumentation requirements, and selecting the test facilities, in addition to defining control system and assembly requirements. Plans for a comprehensive test program to demonstrate the duct burner and nozzle technologies were formulated. The plans include both aeroacoustic and emissions testing.

  10. The 1985 long-range program plan

    NASA Technical Reports Server (NTRS)

    1984-01-01

    That continual evolution of NASA's research and development, is reflected in the missions, goals, and objectives planned for FY1985 and later years, in accordance with the responsibilities by the National Aeronautics and Space Act of 1958, as amended. New starts for the next ten years and space program activities to year 2000 are highlighted including space science and applications, space flight, space station, space tracking and data systems, and space research and technology. Space programs for the early 21st century and aeronautics programs up to and beyond the year 2000 are also covered.

  11. Photovoltaics program plan, FY 1991--FY 1995

    SciTech Connect

    Not Available

    1991-10-01

    This program plan describes the goals and philosophy of DOE National Photovoltaics Program and its major research and development activities for fiscal years (FY) 1991 through 1995. The plan represents a consensus among researchers and manufacturers, as well as current and potential users of photovoltaics (PV). It defines the activites that we believe are necessary to continue the rapid progress toward acceptance of photovoltaics as a serious candidate for cost-competitive electric power generation by the utility, transportation, buildings, and industrial sectors. A succesful National Photovoltaics Program will help achieve many of our national priorities. The mission of the National Photovoltaics Program is to help US industry to develop photovoltaic technology for large-scale generation of economically competitive electric power in the United States, making PV a significant part of our national energy mix. To fully achieve this, we must continue to work toward the long-term goals established in our previous program plan: reducing the price of delivered electricity to 5 to 6 cents per kilowatt-hour (kWh), increasing lifetimes to 30 years, and increasing module efficiencies to 15% for flat-plate and 25% for concentrator technologies. If progress continues at its current pace, we expect that the PV industry will have installed at least 1000 megawatts (MW) of capacity in the United States and 500 MW internationally by the year 2000.

  12. Natural and accelerated bioremediation research program plan

    SciTech Connect

    1995-09-01

    This draft plan describes a ten-year program to develop the scientific understanding needed to harness and develop natural and enhanced biogeochemical processes to bioremediate contaminated soils, sediments and groundwater at DOE facilities. The Office of Health and Environmental Research (OHER) developed this program plan, with advice and assistance from DOE`s Office of Environmental Management (EM). The program builds on OHER`s tradition of sponsoring fundamental research in the life and environmental sciences and was motivated by OHER`s and Office of Energy Research`s (OER`s) commitment to supporting DOE`s environmental management mission and the belief that bioremediation is an important part of the solution to DOE`s environmental problems.

  13. 76 FR 7098 - Dealer Floor Plan Pilot Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-09

    ... ADMINISTRATION 13 CFR Parts 120 and 121 Dealer Floor Plan Pilot Program AGENCY: U.S. Small Business... Dealer Floor Plan Pilot Program to make available 7(a) loan guaranties for lines of credit that provide floor plan financing. This new Dealer Floor Plan Pilot Program was created in the Small Business...

  14. Waste Management Program management plan. Revision 1

    SciTech Connect

    1997-02-01

    As the prime contractor to the Department of Energy Idaho Operations Office (DOE-ID), Lockheed Martin Idaho Technologies Company (LMITCO) provides comprehensive waste management services to all contractors at the Idaho National Engineering and Environmental Laboratory (INEEL) through the Waste Management (WM) Program. This Program Management Plan (PMP) provides an overview of the Waste Management Program objectives, organization and management practices, and scope of work. This document will be reviewed at least annually and updated as needed to address revisions to the Waste Management`s objectives, organization and management practices, and scope of work. Waste Management Program is managed by LMITCO Waste Operations Directorate. The Waste Management Program manages transuranic, low-level, mixed low-level, hazardous, special-case, and industrial wastes generated at or transported to the INEEL.

  15. Environmental Restoration Quality Program Implementation Plan

    SciTech Connect

    Not Available

    1992-08-01

    The Environmental Restoration (ER) Program requirements for implementation of DOE Order 5700.6C are identified in the Environmental Restoration Quality Program Plan, (QPP). Management systems necessary to implement the ER QPP consist of the necessary standards and procedures required to be developed to adequately control ER processes. To the extent possible, Martin Marietta Energy Systems, Inc., standards and procedures will be utilized at the ER Program level, and requirements will not be repeated. The quality management systems identified for enhancement or development are identified in the section on Procedure Development Strategy and directly relate to unique ER Program activities. Procedures and standards that currently exist in the ER Program will be validated for compliance with ER QPP requirements.

  16. Exploration Technology Program plans and directions

    NASA Technical Reports Server (NTRS)

    Aldrich, Arnold; Rosen, Robert; Craig, Mark; Mankins, John C.

    1990-01-01

    A summary of the proposed Space Exploration Initiative (SEI) needs that have been identified is presented along with a detailed review of the status of SEI technology planning. Plans are also being formulated to implement an Exploration Technology Program (ETP) that will develop the major technologies required for SEI. The ETP will provide in the near term clear demonstrations of potential exploration technologies, results of research to support SEI architecture decisions, and a foundation of mature technology that is ready to be applied in the first round of SEI missions. A family of functional building blocks has been defined from which both lunar and Mars SEI mission architectures can be constructed.

  17. Phase C/D program development plan. Volume 1: Program plan

    NASA Technical Reports Server (NTRS)

    1971-01-01

    The Phase C/D definition of the Modular Space Station has been developed. The modular approach selected during the option period was evaluated, requirements were defined, and program definition and preliminary design were accomplished. The Space Station Project is covered in depth, the research applications module is limited to a project-level definition, and the shuttle operations are included for interface requirements identification, scheduling, and costing. Discussed in detail are: (1) baseline program and project descriptions; (2) phase project planning; (3) modular space station program schedule; (4) program management plan; (5) operations; (6) facilities; (7) logistics; and (8) manpower.

  18. Review of Global Change Research Program plan

    NASA Astrophysics Data System (ADS)

    Showstack, Randy

    2012-01-01

    The draft 10-year strategic plan for the U.S. Global Change Research Program (USGCRP), which proposes broadening the scope of the program from climate change only to climate change and climaterelated global changes, “is an important step in the right direction,” according to a 5 January review of the plan by a committee of the U.S. National Research Council (NRC) of the National Academies. However, the committee also said that the program's legislative mandate is even broader in allowing USGCRP to address many aspects of global change including climate change, the global hydrological cycle, and widespread land use changes. “The Program's legislative mandate is to address all of global change, whether or not related to climate. The Committee concurs that this broader scope is appropriate, but realizes that such an expansion may be constrained by budget realities and by the practical challenge of maintaining clear boundaries for an expanded program,” the report states. “We encourage sustained efforts to expand the Program over time, along with efforts to better define and prioritize what specific topics are included within the bounds of global change research.”

  19. Why some family planning program fail.

    PubMed

    1976-04-01

    40 experts representing Nepal, Malaysia, Thailand, Singapore, Korea, and the Philippines participated in a 3-day workshop in Manila in March 1976 for the purpose of discussing and proposing ways of dealing with the financial problems confronting the population programs of the individual countries. The Inter-Governmental Coordinating Committee for Southeast Asia Family/Population Planning sponsored the workshop. The recommendations made at the meeting were: 1) standardization of financing reporting procedures by the region's country programs on family planning; 2) closer coordination between donor agencies and policy-making bodies of country programs in the disbursement of funds; 3) frequent exchanges of experiences, ideas, technicaL knowledge, and other matters pertaining to the financial management of such programs; and 4) inclusion of applicable financial management topics in the training of clinical staffs and those involved in follow-up operations. Additionally, a proposal was made that national population organizations or committees develop research and evaluation units. Workshop discussion sessions focused on financial planning and management, accounting and disbursement of funds, use and control of foreign aid, cost of effectiveness and benefit analysis, and financial reporting.

  20. Biological abatement of cellulase inhibitors.

    PubMed

    Cao, Guangli; Ximenes, Eduardo; Nichols, Nancy N; Zhang, Leyu; Ladisch, Michael

    2013-10-01

    Removal of enzyme inhibitors released during lignocellulose pretreatment is essential for economically feasible biofuel production. We tested bio-abatement to mitigate enzyme inhibitor effects observed in corn stover liquors after pretreatment with either dilute acid or liquid hot water at 10% (w/v) solids. Bio-abatement of liquors was followed by enzymatic hydrolysis of cellulose. To distinguish between inhibitor effects on enzymes and recalcitrance of the substrate, pretreated corn stover solids were removed and replaced with 1% (w/v) Solka Floc. Cellulose conversion in the presence of bio-abated liquors from dilute acid pretreatment was 8.6% (0.1x enzyme) and 16% (1x enzyme) higher than control (non-abated) samples. In the presence of bio-abated liquor from liquid hot water pretreated corn stover, 10% (0.1x enzyme) and 13% (1x enzyme) higher cellulose conversion was obtained compared to control. Bio-abatement yielded improved enzyme hydrolysis in the same range as that obtained using a chemical (overliming) method for mitigating inhibitors. Copyright © 2013 Elsevier Ltd. All rights reserved.

  1. Repository-Based Software Engineering Program: Working Program Management Plan

    NASA Technical Reports Server (NTRS)

    1993-01-01

    Repository-Based Software Engineering Program (RBSE) is a National Aeronautics and Space Administration (NASA) sponsored program dedicated to introducing and supporting common, effective approaches to software engineering practices. The process of conceiving, designing, building, and maintaining software systems by using existing software assets that are stored in a specialized operational reuse library or repository, accessible to system designers, is the foundation of the program. In addition to operating a software repository, RBSE promotes (1) software engineering technology transfer, (2) academic and instructional support of reuse programs, (3) the use of common software engineering standards and practices, (4) software reuse technology research, and (5) interoperability between reuse libraries. This Program Management Plan (PMP) is intended to communicate program goals and objectives, describe major work areas, and define a management report and control process. This process will assist the Program Manager, University of Houston at Clear Lake (UHCL) in tracking work progress and describing major program activities to NASA management. The goal of this PMP is to make managing the RBSE program a relatively easy process that improves the work of all team members. The PMP describes work areas addressed and work efforts being accomplished by the program; however, it is not intended as a complete description of the program. Its focus is on providing management tools and management processes for monitoring, evaluating, and administering the program; and it includes schedules for charting milestones and deliveries of program products. The PMP was developed by soliciting and obtaining guidance from appropriate program participants, analyzing program management guidance, and reviewing related program management documents.

  2. 29 CFR 4207.4 - Withdrawal liability payments during pendency of abatement determination.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... establish an escrow account for, the plan that satisfies the requirements of paragraph (b) of this section... withdrawal liability. An employer that applies for abatement and neither provides a bond/escrow nor pays its withdrawal liability payments remains eligible for abatement. (b) Bond/escrow. The bond or escrow allowed by...

  3. 29 CFR 4207.4 - Withdrawal liability payments during pendency of abatement determination.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... establish an escrow account for, the plan that satisfies the requirements of paragraph (b) of this section... withdrawal liability. An employer that applies for abatement and neither provides a bond/escrow nor pays its withdrawal liability payments remains eligible for abatement. (b) Bond/escrow. The bond or escrow allowed by...

  4. 29 CFR 4207.4 - Withdrawal liability payments during pendency of abatement determination.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... establish an escrow account for, the plan that satisfies the requirements of paragraph (b) of this section... withdrawal liability. An employer that applies for abatement and neither provides a bond/escrow nor pays its withdrawal liability payments remains eligible for abatement. (b) Bond/escrow. The bond or escrow allowed by...

  5. 29 CFR 4207.4 - Withdrawal liability payments during pendency of abatement determination.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... establish an escrow account for, the plan that satisfies the requirements of paragraph (b) of this section... withdrawal liability. An employer that applies for abatement and neither provides a bond/escrow nor pays its withdrawal liability payments remains eligible for abatement. (b) Bond/escrow. The bond or escrow allowed by...

  6. 29 CFR 4207.4 - Withdrawal liability payments during pendency of abatement determination.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... establish an escrow account for, the plan that satisfies the requirements of paragraph (b) of this section... withdrawal liability. An employer that applies for abatement and neither provides a bond/escrow nor pays its withdrawal liability payments remains eligible for abatement. (b) Bond/escrow. The bond or escrow allowed by...

  7. Future plans for NASA's Oceanic Processes Program

    NASA Technical Reports Server (NTRS)

    Wilson, W. S.

    1980-01-01

    NASA's Oceanic Processes Program has the objectives to develop a scientific basis for viewing the oceans from space and to demonstrate the utility of such an undertaking. There are currently four flight projects concerning the oceanic area. These projects are related to the National Oceanic Satellite System (NOSS), the Dynamic Ocean Topography Experiment (TOPEX), the Gravity Satellite (GRAVSAT), and a Synthetic Aperture Radar (SAR) mission. NOSS is being planned as a limited operational demonstration of viewing the oceans from space. It is to provide a capability to observe surface winds, waves, temperature, color, ice cover, and currents. It is scheduled for launch in 1986. TOPEX and GRAVSAT are being planned as research missions and are both scheduled for launch about 1986. The SAR mission is being planned to provide a spaceborne capability to observe the surface of the land and the oceans.

  8. ATF Neutron Irradiation Program Technical Plan

    SciTech Connect

    Geringer, J. W.; Katoh, Yutai

    2016-03-01

    The Japan Atomic Energy Agency (JAEA) under the Civil Nuclear Energy Working Group (CNWG) is engaged in a cooperative research effort with the U.S. Department of Energy (DOE) to explore issues related to nuclear energy, including research on accident-tolerant fuels and materials for use in light water reactors. This work develops a draft technical plan for a neutron irradiation program on the candidate accident-tolerant fuel cladding materials and elements using the High Flux Isotope Reactor (HFIR). The research program requires the design of a detailed experiment, development of test vehicles, irradiation of test specimens, possible post-irradiation examination and characterization of irradiated materials and the shipment of irradiated materials to JAEA in Japan. This report discusses the technical plan of the experimental study.

  9. Arctic contaminants research program: Research plan

    SciTech Connect

    Landers, D.H.; Ford, J.; Allen, S.; Curtis, L.; Omernik, J.M.

    1992-12-01

    The research plan was initially intended to contain the information needed to evaluate the U.S. Environmental Protection Agency (EPA) Arctic Contaminant Research Program (ACRP). The scientific aspects of the proposed research form the main body of the document and focus on objectives of the specific research components, current literature, approach, and rationale. The ACRP has three major components: (1) extensive sampling of lichens, mosses, and soils to provide a spatial understanding of the status and extent of contaminants present in arctic ecosystems, (2) lake sediment research to evaluate the source and history of arctic contaminant inputs, and (3) food web research to evaluate the possible effects of atmospherically transported pollutants on arctic food webs. The research plan will be used to provide a framework for the ACRP, based on the preliminary studies done to date and will be implemented over the next five years. The Program will undergo additional peer reviews at two-year intervals in the future.

  10. Environmental Restoration Quality Program Implementation Plan. Environmental Restoration Program

    SciTech Connect

    Not Available

    1992-08-01

    The Environmental Restoration (ER) Program requirements for implementation of DOE Order 5700.6C are identified in the Environmental Restoration Quality Program Plan, (QPP). Management systems necessary to implement the ER QPP consist of the necessary standards and procedures required to be developed to adequately control ER processes. To the extent possible, Martin Marietta Energy Systems, Inc., standards and procedures will be utilized at the ER Program level, and requirements will not be repeated. The quality management systems identified for enhancement or development are identified in the section on Procedure Development Strategy and directly relate to unique ER Program activities. Procedures and standards that currently exist in the ER Program will be validated for compliance with ER QPP requirements.

  11. 23 CFR 450.308 - Funding for transportation planning and unified planning work programs.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... work programs. 450.308 Section 450.308 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF... Programming § 450.308 Funding for transportation planning and unified planning work programs. (a) Funds... documented in a unified planning work program (UPWP) or simplified statement of work in accordance with...

  12. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    SciTech Connect

    Not Available

    1994-09-01

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides `execution year` work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets.

  13. Tank Focus Area Pretreatment Program. FY 1995 Program Management Plan

    SciTech Connect

    Morrison, M.I.; McGinnis, C.P.; Wilkenson, W.T.; Hunt, R.D.

    1995-02-01

    This program management plan (PMP) describes the FY 1995 project plans for the Pretreatment Program of the Tank Focus Area. The Tank Focus Area is one of five areas of environmental concerns originally identified by the Deputy Assistant Secretary for Technology Development (EM-50). Projects in the Tank Focus Area relate to the remediation of liquid waste stored in underground storage tanks at various US Department of Energy sites. The Pretreatment Program is an organizational unit performing work within the Tank Focus Area. The function of the Pretreatment Program is to develop, test, evaluate, and demonstrate new technologies, with emphasis on separations. The 11 Pretreatment Program projects for FY 1995 are (1) Cesium Extraction Testing, (2) Comprehensive Supernate Treatment, (3) Hot Cell Studies, (4) Cesium Removal Demonstration, (5) Out-of-Tank Evaporator Demonstration, (6) Crossflow Filtration, (7) Technical Interchange with CEA, (8) TRUEX Applications, (9) NAC/NAG Process Studies (conducted at Oak Ridge National Laboratory), (10) NAC/NAG Process and Waste Form Studies (conducted at Florida International University), and (11) Program Management. Section 2 of this PMP contains a separate subsection for each FY 1995 project. A brief description of the project, a schedule of major milestones, and a breakdown of costs are provided for each project. The PMP also contains sections that describe the project controls that are in place. Quality assurance, document control, the project management system, and the management organization are described in these sections.

  14. How Strategic Planning Keeps You Sane when Delivering Distance Programs

    ERIC Educational Resources Information Center

    MacNeil, Dixie; Luzius, Kim; Dunkin, Sonya

    2010-01-01

    This paper details the advantages of creating a strategic plan in the development and delivery of distance programs at the authors' own institution. The steps involved in the planning process and the three key elements of a successful strategic plan are addressed. The key elements include a program plan explaining the roles/responsibilities of…

  15. How Strategic Planning Keeps You Sane when Delivering Distance Programs

    ERIC Educational Resources Information Center

    MacNeil, Dixie; Luzius, Kim; Dunkin, Sonya

    2010-01-01

    This paper details the advantages of creating a strategic plan in the development and delivery of distance programs at the authors' own institution. The steps involved in the planning process and the three key elements of a successful strategic plan are addressed. The key elements include a program plan explaining the roles/responsibilities of…

  16. Oil-fueled equipment research: program plan

    SciTech Connect

    Hutchinson, R.A.

    1986-09-01

    The purpose of this document is to define the basis for a US Department of Energy (DOE) program for oil-fueled equipment research. The needs for an benefits of the technical research are explained, and a research plan is presented. This program was developed by Pacific Northwest Laboratory (PNL) with assistance from Steven Winters Associates and input from Brookhaven National Laboratory, Oak Ridge National Laboratory, and many representatives of the heating-oil and oil-fueled equipment industries. The private sector input was extensive, obtained through a series of workshops and formal and informal surveys. The planning effort was directed by the Building Equipment Division of the DOE Office of Buildings and Community Systems. The objective of the oil-fueled equipment research program is to develop the technological basis for new equipment and operating strategies based on improved understanding of oil-burning fundamentals. The program will provide the oil-fueled equipment industry with the basis for developing a new, high-tech generation of equipment, and the oil distributors and equipment installers and consumers with improved knowledge of how best to install and operate such equipment.

  17. [Family planning programs and birth control in the third world].

    PubMed

    Wohlschlagl, H

    1991-01-01

    The population explosion has been abating since the 2nd half of the 1960s. The birth rate of the 3rd World dropped from 45/1000 during 1950-55 to 31/1000 during 1985-90. From the 1st half of the 1960s to the 1st half of the 1980s the total fertility of such countries dropped from 6.1 to 4.2 children/woman. In Taiwan, Singapore, Hong Kong, South Korea, and Malaysia living standards improved as a result of industrialization, and fertility decreased significantly. In Sri Lanka, China, North Vietnam, and Thailand the drop of fertility is explained by cultural and religious factors. In 1982 about 78% of the population of developing countries lived in 39 states that followed an official policy aimed at reducing the population. Another 16% lived in countries supporting the concept of a desired family size. However, World Bank data showed that in the mid-1980s in 27 developing countries no state family planning (FP) programs existed. India adopted an official FP program in 1952, Pakistan followed suit in 1960, South Korea in 1961, and China in 1962. In Latin America a split policy manifested itself: in Brazil birth control was rejected, only Colombia had a FP policy. In 1986 the governments of 68 of 131 developing countries representing 3.1 billion people considered the number of children per woman too high. 31 of these countries followed concrete population control policies. On the other hand, in 1986 24 countries of Africa with 40% of the continent's population took no measures to influence population growth. In Latin America and the Caribbean 18 of 33 countries were idle, except for Mexico that had a massive state FP program. These programs also improve maternal and child health with birth spacing of at least 2 years, and the prevention of pregnancies of too young women or those over 40. The evaluation of rapidly spreading FP programs in the 1970s was carried out by the World Fertility Survey in 41 countries. The impact of FP programs was more substantial than

  18. 10 CFR 851.22 - Hazard prevention and abatement.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Hazard prevention and abatement. 851.22 Section 851.22 Energy DEPARTMENT OF ENERGY WORKER SAFETY AND HEALTH PROGRAM Specific Program Requirements § 851.22... appropriate; (2) Engineering controls where feasible and appropriate; (3) Work practices and administrative...

  19. N Reactor Deactivation Program Plan. Revision 4

    SciTech Connect

    Walsh, J.L.

    1993-12-01

    This N Reactor Deactivation Program Plan is structured to provide the basic methodology required to place N Reactor and supporting facilities {center_dot} in a radiologically and environmentally safe condition such that they can be decommissioned at a later date. Deactivation will be in accordance with facility transfer criteria specified in Department of Energy (DOE) and Westinghouse Hanford Company (WHC) guidance. Transition activities primarily involve shutdown and isolation of operational systems and buildings, radiological/hazardous waste cleanup, N Fuel Basin stabilization and environmental stabilization of the facilities. The N Reactor Deactivation Program covers the period FY 1992 through FY 1997. The directive to cease N Reactor preservation and prepare for decommissioning was issued by DOE to WHC on September 20, 1991. The work year and budget data supporting the Work Breakdown Structure in this document are found in the Activity Data Sheets (ADS) and the Environmental Restoration Program Baseline, that are prepared annually.

  20. 75 FR 70061 - Dealer Floor Plan Pilot Program Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-16

    ... ADMINISTRATION Dealer Floor Plan Pilot Program Meeting AGENCY: U.S. Small Business Administration (SBA). ACTION... agenda for a meeting regarding the Dealer Floor Plan Pilot Program established in the Small Business Jobs Act of 2010. The meeting will be open to the public. DATES: The Dealer Floor Plan Pilot Program...

  1. 20 CFR 653.112 - State agency program budget plans.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false State agency program budget plans. 653.112 Section 653.112 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR SERVICES... State agency program budget plans. (a) Each State agency, in its annual program budget plan, shall...

  2. 49 CFR 613.200 - Statewide transportation planning and programming.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Statewide transportation planning and programming. 613.200 Section 613.200 Transportation Other Regulations Relating to Transportation (Continued... Transportation Planning and Programming § 613.200 Statewide transportation planning and programming. The...

  3. 49 CFR 613.200 - Statewide transportation planning and programming.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Statewide transportation planning and programming. 613.200 Section 613.200 Transportation Other Regulations Relating to Transportation (Continued... Transportation Planning and Programming § 613.200 Statewide transportation planning and programming. The...

  4. 49 CFR 613.200 - Statewide transportation planning and programming.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Statewide transportation planning and programming. 613.200 Section 613.200 Transportation Other Regulations Relating to Transportation (Continued... Transportation Planning and Programming § 613.200 Statewide transportation planning and programming. The...

  5. 49 CFR 613.200 - Statewide transportation planning and programming.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Statewide transportation planning and programming. 613.200 Section 613.200 Transportation Other Regulations Relating to Transportation (Continued... Transportation Planning and Programming § 613.200 Statewide transportation planning and programming. The...

  6. 49 CFR 613.200 - Statewide transportation planning and programming.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Statewide transportation planning and programming. 613.200 Section 613.200 Transportation Other Regulations Relating to Transportation (Continued... Transportation Planning and Programming § 613.200 Statewide transportation planning and programming. The...

  7. 7 CFR 1221.121 - Programs, plans, and projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 10 2011-01-01 2011-01-01 false Programs, plans, and projects. 1221.121 Section 1221..., Research, and Information § 1221.121 Programs, plans, and projects. (a) The Board shall receive and evaluate, or on its own initiative develop, and submit to the Secretary for approval any program, plan, or...

  8. 7 CFR 1216.52 - Programs, plans, and projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 10 2011-01-01 2011-01-01 false Programs, plans, and projects. 1216.52 Section 1216... Assessments § 1216.52 Programs, plans, and projects. (a) The Board shall receive and evaluate, or on its own initiative develop, and submit to the Secretary for approval any program, plan, or project authorized under...

  9. The future of family planning programs.

    PubMed

    Caldwell, John C; Phillips, James F; Barkat-e-Khuda

    2002-03-01

    National family planning programs have been an important instrument in accelerating global fertility decline and in restricting ultimate world population to a level probably below ten billion. They began to come into being after 1950 and will probably go out of existence in most of the world's regions by 2050. The archetypal programs were instituted in Asia and North Africa. The end of the twentieth century is an appropriate half-way mark at which to evaluate the twentieth-century programs and to assess what changes in them will be needed for the twenty-first century. Some changes are necessary because dramatic events have occurred: (1) long-term replacement-level fertility has been attained in most of East Asia and some of Southeast Asia, and accordingly, some programs there are being phased out; (2) mainland South Asian fertility has been slower to decline; (3) international donor funding is diminishing and may not be significant during much of the twenty-first century; (4) the 1994 International Conference on Population and Development held in Cairo called for a radical change in programs away from demographic aims and toward reproductive health and the improvement of the situation of women; and (5) the future family planning frontier will be sub-Saharan Africa, for which radically new types of programs may have to be developed. These issues were discussed in January 2000 at a conference held in Dhaka, Bangladesh. A selection of contributions to the conference is published here. This article provides an overview of the issues based partly on this selection and partly on the discussions that took place at the conference.

  10. Quality Assurance Program Plan for the Environmental Restoration Program

    SciTech Connect

    Not Available

    1992-03-30

    The United States Department of Energy (USDOE) has initiated the Environmental Restoration Program (ERP) in an effort to manage, control and remediate existing hazardous, toxic and radioactive wastes generated at the Portsmouth Gaseous Diffusion Plant (PORTS). This ERP Quality Assurance Program Plan (QAPP) is responsive to the PORTS ESH Division QAPP and the ES Environmental Restoration Division (ERD) QAPP. This QAPP establishes the policies, requirements and responsibilities by which an appropriate level of QA shall be implemented within the PORTS-ERP. All PORTS-ERP activities shall be conducted in accordance with the requirements of this document and/or of a project level document which is derivative of this document.

  11. 49 CFR 659.25 - Annual review of system safety program plan and system security plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... annual review of its system safety program plan and system security plan. (b) In the event the rail transit agency's system safety program plan is modified, the rail transit agency must submit the modified... agency. (c) In the event the rail transit agency's system security plan is modified, the rail transit...

  12. Planning aquatic ecosystem restoration monitoring programs

    SciTech Connect

    Thom, R.M.; Wellman, K.F.

    1997-01-01

    This study was conducted as part of the Evaluation of Environmental Investments Research Program (EEIRP). The EEIRP is sponsored by the US Army Corps of Engineers. The objectives of this work are to (1) identify relevant approaches and features for environmental investment measures to be applied throughout the project life; (2) develop methods to access the effectiveness of the approach or feature for providing the intended environmental output; (3) develop and provide guidance for formulating environmental projects; and (4) provide guidance for formulating and identifying relevant cost components of alternate restoration plans.

  13. Standard Review Plan Update and Development Program

    SciTech Connect

    Not Available

    1992-05-01

    This implementing procedures document (IPD) was prepared for use in implementing tasks under the standard review plan update and development program (SRP-UDP). The IPD provides comprehensive guidance and detailed procedures for SRP-UDP tasks. The IPD is mandatory for contractors performing work for the SRP-UDP. It is guidance for the staff. At the completion of the SRP-UDP, the IPD will be revised (to remove the UDP aspects) and will replace NRR Office Letter No. 800 as long-term maintenance procedures.

  14. Radiological Assistance Program Flight Planning Tool

    SciTech Connect

    Messick, C.; Pham, M.; Ridgeway, J.; Smith, R.

    2011-12-19

    The Radiological Assitance Program (RAP) is the National Nuclear Security Administration's (NNSA) first responder to radiological emergencies. RAP's mission is to identify and minimize radiological hazards, as well as provide radiological emergency response and technical advice to decision makers. One tool commonly used is aerial radiation detection equipment. During a response getting this equipment in the right place quickly is critical. The RAP Flight Planning Tool (a ArcGIS 10 Desktop addin) helps minimize this response time and provides specific customizable flight path information to the flight staff including maps, coordinates, and azimuths.

  15. 25 CFR 87.9 - Programming aspects of plans.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 1 2012-04-01 2011-04-01 true Programming aspects of plans. 87.9 Section 87.9 Indians... JUDGMENT FUNDS § 87.9 Programming aspects of plans. In assessing any tribal programming proposal the... such reservation residents; the nature of recent programming affecting the subject tribe or group and...

  16. 25 CFR 87.9 - Programming aspects of plans.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false Programming aspects of plans. 87.9 Section 87.9 Indians... JUDGMENT FUNDS § 87.9 Programming aspects of plans. In assessing any tribal programming proposal the... such reservation residents; the nature of recent programming affecting the subject tribe or group and...

  17. 25 CFR 87.9 - Programming aspects of plans.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false Programming aspects of plans. 87.9 Section 87.9 Indians... JUDGMENT FUNDS § 87.9 Programming aspects of plans. In assessing any tribal programming proposal the... such reservation residents; the nature of recent programming affecting the subject tribe or group and...

  18. 25 CFR 87.9 - Programming aspects of plans.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 1 2014-04-01 2014-04-01 false Programming aspects of plans. 87.9 Section 87.9 Indians... JUDGMENT FUNDS § 87.9 Programming aspects of plans. In assessing any tribal programming proposal the... such reservation residents; the nature of recent programming affecting the subject tribe or group and...

  19. 25 CFR 87.9 - Programming aspects of plans.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Programming aspects of plans. 87.9 Section 87.9 Indians... JUDGMENT FUNDS § 87.9 Programming aspects of plans. In assessing any tribal programming proposal the... such reservation residents; the nature of recent programming affecting the subject tribe or group and...

  20. Indiana's Comprehensive Action Plan for Adult Education Programs.

    ERIC Educational Resources Information Center

    Indiana State Dept. of Education, Indianapolis.

    Indiana's Comprehensive Action Plan (I-CAP) provides a framework for program excellence, accountability, and continuous improvement in adult education. The action plan includes guiding principles and benchmarks for quality programs. Adult education programs are evaluated annually on these 10 established principles of program quality: educational…

  1. Solid Waste Assurance Program Implementation Plan

    SciTech Connect

    Irons, L.G.

    1995-06-19

    On June 6, 1995, a waiver to Hanford Site Solid Waste Acceptance Criteria, was approved by the US Department of Energy Richland Operations Office (RL) to replace the low-level, mixed, and transuranic (TRU) generator assessment programs with the Solid Waste Assurance Program (SWAP). This is associated with a waiver that was approved on March 16, 1995 to replace the Storage/Disposal Approval Record (SDAR) requirements with the Waste Specification System (WSS). This implementation plan and the SWAP applies to Solid Waste Disposal (SWD) functions, facilities, and personnel who perform waste acceptance, verification, receipt, and management functions of dangerous, radioactive, and mixed waste from on- and off-site generators who ship to or within the Hanford Site for treatment, storage, and/or disposal (TSD) at SWD TSD facilities.

  2. Abatement of Marine Coatings Containing Heavy Metals

    DTIC Science & Technology

    1995-06-01

    in the abatement of heavy metal containing marine coatings. Funding for this...shipyards to be proactive in the area of heavy metal coating systems abatement as current regulations were not "user friendly" in shipboard applications.

  3. Westinghouse Hanford Company Pollution Prevention Program Implementation Plan

    SciTech Connect

    Floyd, B.C.

    1994-10-01

    This plan documents Westinghouse Hanford Company`s (WHC) Pollution Prevention (P2) (formerly Waste Minimization) program. The program includes WHC; BCS Richland, Inc. (BCSR); and ICF Kaiser Hanford Company (ICF KH). The plan specifies P2 program activities and schedules for implementing the Hanford Site Waste Minimization and Pollution Prevention Awareness (WMin/P2) Program Plan requirements (DOE 1994a). It is intended to satisfy the U.S. Department of Energy (DOE) and other legal requirements that are discussed in both the Hanford Site WMin/P2 plan and paragraph C of this plan. As such, the Pollution Prevention Awareness Program required by DOE Order 5400.1 (DOE 1988) is included in the WHC P2 program. WHC, BCSR, and ICF KH are committed to implementing an effective P2 program as identified in the Hanford Site WMin/P2 Plan. This plan provides specific information on how the WHC P2 program will develop and implement the goals, activities, and budget needed to accomplish this. The emphasis has been to provide detailed planning of the WHC P2 program activities over the next 3 years. The plan will guide the development and implementation of the program. The plan also provides background information on past program activities. Because the plan contains greater detail than in the past, activity scope and implementation schedules may change as new priorities are identified and new approaches are developed and realized. Some activities will be accelerated, others may be delayed; however, all of the general program elements identified in this plan and contractor requirements identified in the Site WMin/P2 plan will be developed and implemented during the next 3 years. This plan applies to all WHC, BCSR, and ICF KH organizations and subcontractors. It will be distributed to those with defined responsibilities in this plan; and the policy, goals, objectives, and strategy of the program will be communicated to all WHC, BCSR, and ICF KH employees.

  4. Job Search Club Program. Program Notebook. Planning/Operations/Leader's Guide.

    ERIC Educational Resources Information Center

    Boys' Clubs of America, New York, NY.

    Guides are provided for planning, operating, and leading a Job Search Club Program. The planning guide for use by club directors, program committees, and club staff presents a cohesive, systematic plan for launching a successful job search program. It offers a step-by-step description of the essential elements of the planning process, an…

  5. Fact Sheet: Risk Management Plan (RMP) Audit Program

    EPA Pesticide Factsheets

    Risk management programs, which consist of a hazard assessment, a prevention program, and an emergency response program; must be periodically audited to assess whether the plans are adequate or need to be revised to comply with the regulation.

  6. Pollution Abatement and Control Expenditures Survey (PACE)

    EPA Pesticide Factsheets

    The Pollution Abatement Costs and Expenditures (PACE) survey is the most comprehensive national source of pollution abatement costs and expenditures related to environmental protection for the manufacturing sector of the United States. The PACE survey collects facility-level data on pollution abatement capital expenditures and operating costs associated with compliance to local, state, and federal regulations and voluntary or market-driven pollution abatement activities.

  7. Evaluation plan for the Weatherization Assistance Program

    SciTech Connect

    Beschen, D.A. ); Brown, M.A. )

    1991-08-01

    The most recent national evaluation of the impacts of the US Department of Energy (DOE)'s Weatherization Assistance Program (WAP) was completed in 1984 based on consumption data for households weatherized in 1981. WAP regulations and operations have changed substantially over the last decade, and new opportunities are on the horizon. DOE recognizes the need for a more current national level evaluation of the program and has developed a plan for conducting the evaluation with the support of the Oak Ridge National Laboratory (ORNL). The national WAP evaluation as currently proposed has seven major goals: (1) estimate the energy saved by the program -- one, two, and three years after participation; (2) assess nonenergy impacts, such as comfort, safety, and housing affordability; (3) assess program cost effectiveness; (4) analyze factors which influence energy savings, nonenergy impacts, and cost effectiveness; (5) describe the WAP network's capabilities and the innovative weatherization technologies and procedures it has employed; (6) characterize the WAP-eligible population and the federal and non-federal funds that haven been used to meet its weatherization needs; and, (7) identify promising WAP opportunities for the future. The data collection, analyses, and reports are to be completed in phases between 1991 and 1993. The evaluation methodologies vary by fuel type, housing type, and climate zone. The analysis of energy savings and cost effectiveness will be based primarily on weather-normalized, retrospective utility billing records (collected for pre- and postretrofit years). 12 refs., 8 figs.

  8. 23 CFR 772.11 - Noise abatement.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... OF HIGHWAY TRAFFIC NOISE AND CONSTRUCTION NOISE § 772.11 Noise abatement. (a) In determining and abating traffic noise impacts, primary consideration is to be given to exterior areas. Abatement will usually be necessary only where frequent human use occurs and a lowered noise level would be of...

  9. 23 CFR 772.11 - Noise abatement.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... OF HIGHWAY TRAFFIC NOISE AND CONSTRUCTION NOISE § 772.11 Noise abatement. (a) In determining and abating traffic noise impacts, primary consideration is to be given to exterior areas. Abatement will usually be necessary only where frequent human use occurs and a lowered noise level would be of...

  10. Biological abatement of enzyme inhibitors

    USDA-ARS?s Scientific Manuscript database

    Lignocellulose pretreatments release phenolic compounds that cause enzyme inhibition and deactivation. Bio-abatement, the biological removal of furfurals, acetic acid and phenolics, may utilize fungal fermentation to metabolize these compounds to CO2, water, cell mass, and heat. Our work with Coni...

  11. Asbestos Abatement: Start to Finish.

    ERIC Educational Resources Information Center

    Makruski, Edward D.

    1984-01-01

    An EPA survey of the largest school districts in the nation revealed that over 50 percent have not inspected for asbestos and two-thirds have failed to notify parents adequately. Seven steps are therefore provided for successful asbestos abatement, in anticipation of tougher regulations now under consideration. (TE)

  12. Asbestos Abatement--Practical Considerations.

    ERIC Educational Resources Information Center

    Sedrel, Roy A.

    Illinois Senate Bill 1644, the recently passed "Asbestos Abatement Act," requires all schools in the state, public and private alike, to remove friable asbestos by whichever comes first: July 1, 1989, or 3 years following the establishment of a system for state funding for corrective action. This document addresses practical…

  13. Asbestos Abatement--Practical Considerations.

    ERIC Educational Resources Information Center

    Sedrel, Roy A.

    Illinois Senate Bill 1644, the recently passed "Asbestos Abatement Act," requires all schools in the state, public and private alike, to remove friable asbestos by whichever comes first: July 1, 1989, or 3 years following the establishment of a system for state funding for corrective action. This document addresses practical…

  14. Asbestos Abatement: Start to Finish.

    ERIC Educational Resources Information Center

    Makruski, Edward D.

    1984-01-01

    An EPA survey of the largest school districts in the nation revealed that over 50 percent have not inspected for asbestos and two-thirds have failed to notify parents adequately. Seven steps are therefore provided for successful asbestos abatement, in anticipation of tougher regulations now under consideration. (TE)

  15. Electrician Cluster, STEP Training Plan. Skills Training and Education Program.

    ERIC Educational Resources Information Center

    Alabama State Dept. of Postsecondary Education, Montgomery.

    This guide is a training plan for the electrical skills cluster of the Skills Training and Education Program (STEP), an open-entry, open-exit program funded by the Job Training Partnership Act (JTPA). In the STEP training plan, each task has its own lesson plan guide. This manual contains the following information: definitions, instructions for…

  16. Environmental Restoration Quality Program Plan. Environmental Restoration Program

    SciTech Connect

    Colley, J.S.

    1992-08-01

    The Martin Marietta Energy Systems, Inc., Environmental Restoration (ER) Program was initially chartered on October 1, 1989, as a ``entral Environmental Restoration Division`` to manage the investigation and remediation of inactive sites and facilities that have been declared surplus and have no further programmatic use. The Energy Systems ER Division was established to support the DOE Oak Ridge Field Office (DOE-OR) consolidated ER Program. The DOE-OR Assistant Manager for Environmental Restoration and Waste Management provides program and budget direction to the Energy Systems ER Program for environmental restoration activities at the sites operated by Energy Systems (Oak Ridge K-25 Site, Oak Ridge National Laboratory, Oak Ridge Y-12 Plant, Paducah Gaseous Diffusion Plant, Portsmouth Gaseous Diffusion Plant) and at the off-site locations. The Energy Systems ER Division is specifically charged with assessing these sites for potential contamination and managing the cleanup processes. The Energy Systems Environmental Restoration Division was chartered on October 1, 1989, as a central organization to manage the Remedial Action (RA) Program. The purpose of this document is to ensure that: senior ER management provides planning, organization, direction, control, and support to achieve the organization`s objectives; the line organization achieves quality; and overall performance is reviewed and evaluated using a rigorous assessment process.

  17. 18 CFR 740.4 - State water management planning program.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 2 2013-04-01 2012-04-01 true State water management... STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A State... major elements of the State water management program, which should address but not be limited to:...

  18. 18 CFR 740.4 - State water management planning program.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 2 2012-04-01 2012-04-01 false State water management... STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A State... major elements of the State water management program, which should address but not be limited to:...

  19. 18 CFR 740.4 - State water management planning program.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 2 2014-04-01 2014-04-01 false State water management... STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A State... major elements of the State water management program, which should address but not be limited to:...

  20. DOE Hydrogen and Fuel Cells Program Plan (September 2011)

    SciTech Connect

    none,

    2011-09-01

    The Department of Energy Hydrogen and Fuel Cells Program Plan outlines the strategy, activities, and plans of the DOE Hydrogen and Fuel Cells Program, which includes hydrogen and fuel cell activities within the EERE Fuel Cell Technologies Program and the DOE offices of Nuclear Energy, Fossil Energy, and Science.

  1. Program Planning in Two-Year Colleges: A Handbook.

    ERIC Educational Resources Information Center

    Posner, George; And Others

    Part I of this document describes a model for occupational program planning in two-year colleges. The planning process begins with an estimation decision, i.e., whether the program idea is worth investigating. This decision can be divided into seven sub-questions or systems: (1) Identity--what should be the general content of the program? (2)…

  2. 49 CFR 613.100 - Metropolitan transportation planning and programming.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... programming. 613.100 Section 613.100 Transportation Other Regulations Relating to Transportation (Continued... Metropolitan Transportation Planning and Programming § 613.100 Metropolitan transportation planning and programming. The regulations in 23 CFR 450, subpart C, shall be followed in complying with the requirements of...

  3. 49 CFR 613.100 - Metropolitan transportation planning and programming.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... programming. 613.100 Section 613.100 Transportation Other Regulations Relating to Transportation (Continued... Metropolitan Transportation Planning and Programming § 613.100 Metropolitan transportation planning and programming. The regulations in 23 CFR 450, subpart C, shall be followed in complying with the requirements of...

  4. 49 CFR 613.100 - Metropolitan transportation planning and programming.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... programming. 613.100 Section 613.100 Transportation Other Regulations Relating to Transportation (Continued... Metropolitan Transportation Planning and Programming § 613.100 Metropolitan transportation planning and programming. The regulations in 23 CFR 450, subpart C, shall be followed in complying with the requirements of...

  5. 49 CFR 613.100 - Metropolitan transportation planning and programming.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... programming. 613.100 Section 613.100 Transportation Other Regulations Relating to Transportation (Continued... Metropolitan Transportation Planning and Programming § 613.100 Metropolitan transportation planning and programming. The regulations in 23 CFR 450, subpart C, shall be followed in complying with the requirements of...

  6. 49 CFR 613.100 - Metropolitan transportation planning and programming.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... programming. 613.100 Section 613.100 Transportation Other Regulations Relating to Transportation (Continued... Metropolitan Transportation Planning and Programming § 613.100 Metropolitan transportation planning and programming. The regulations in 23 CFR 450, subpart C, shall be followed in complying with the requirements of...

  7. FY97 Geothermal R&D Program Plan

    SciTech Connect

    1996-09-01

    This is the Sandia National Laboratories Geothermal program plan. This is a DOE Geothermal Program planning and control document. Many of these reports were issued only in draft form. This one is of special interest for historical work because it contains what seems to be a complete list of Sandia geothermal program publications (citations / references) from about 1975 to late 1996. (DJE 2005)

  8. The Program Data Analysis Plan for Colorado Special Education.

    ERIC Educational Resources Information Center

    Darby, Charles A., Jr.; And Others

    Presented is a Program Data Analysis Plan (PDAP) for the special education program in Colorado designed to serve as a model for other state education agencies in the development of their own analysis plans. The PDAP is a combination of three major components: a list of program management information requirements in the form of questions, the set…

  9. Site support program plan for ICF Kaiser Hanford Company

    SciTech Connect

    Dieterle, S.E.

    1996-09-27

    The Fiscal Year (FY) 1997 Inftastructure Program Site Support Program Plan (SSPP) addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition.

  10. Quality assurance program plan for radionuclide airborne emissions monitoring

    SciTech Connect

    Boom, R.J.

    1995-12-01

    This Quality Assurance Program Plan identifies quality assurance program requirements and addresses the various Westinghouse Hanford Company organizations and their particular responsibilities in regards to sample and data handling of radiological airborne emissions. This Quality Assurance Program Plan is prepared in accordance with and to written requirements.

  11. Robot trajectory planning via dynamic programming

    SciTech Connect

    Dohrmann, C.R.; Robinett, R.D.

    1994-03-01

    The method of dynamic programming is applied to three example problems dealing with robot trajectory planning. The first two examples involve end-effector tracking of a straight line with rest-to-rest motions of planar two-link and three-link rigid robots. These examples illustrate the usefulness of the method for producing smooth trajectories either in the presence or absence of joint redundancies. The last example demonstrates the use of the method for rest-to-rest maneuvers of a single-link manipulator with a flexible payload. Simulation results for this example display interesting symmetries that are characteristic of such maneuvers. Details concerning the implementation and computational aspects of the method are discussed.

  12. Planning for Life: Developing and Recognizing Exemplary Career Planning Programs. A Resource Guide for Counselors.

    ERIC Educational Resources Information Center

    Dahir, Carol, Ed.

    Recognizing the importance of the need for effective career planning, the United States Army, in conjunction with the Council of Economic Development, conducted a forum to focus on this issue. What emerged was a program called Planning for Life, which annually recognizes outstanding career planning programs at the state and national level. The…

  13. The Solutions Data Base Component of the Water Pollution Abatement Subsystem (WPAS) of the Pollution Abatement Management System. (PAMS).

    DTIC Science & Technology

    1981-04-01

    considera- tions. Army ergineer district, major command (MACOM), and Army Pollution Abatement Program ( APAP ) personnel considering a wastewater...per- sonnel in the DA, MACOMs, installations, MACOM Facility Engineer offices, Corps of Engineers districts and divisions, the APAP , and the DA

  14. 49 CFR 659.25 - Annual review of system safety program plan and system security plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... system security plan. 659.25 Section 659.25 Transportation Other Regulations Relating to Transportation... and system security plan. (a) The oversight agency shall require the rail transit agency to conduct an annual review of its system safety program plan and system security plan. (b) In the event the...

  15. 49 CFR 659.25 - Annual review of system safety program plan and system security plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... system security plan. 659.25 Section 659.25 Transportation Other Regulations Relating to Transportation... and system security plan. (a) The oversight agency shall require the rail transit agency to conduct an annual review of its system safety program plan and system security plan. (b) In the event the...

  16. Improving the Army Planning, Programming, Budgeting, and Execution System (PPBES) The Planning Phase

    DTIC Science & Technology

    2000-01-01

    In 1997 the Army asked that RAND Arroyo Center assist in the reengineering of The Army Plan (TAP). The Army also reinstituted strategic planning and...the product was the Army Strategic Planning Guidance (ASPG), which provides strategic guidance to TAP. Planning and programming in the Army are

  17. U.S. Department of Education FY 1999 Annual Plan, Volume 2: Program Performance Plans.

    ERIC Educational Resources Information Center

    Department of Education, Washington, DC.

    The Government Performance and Results Act of 1993 called for the U.S. Department of Education to prepare an Annual Performance Plan which links the Department's budget request with its Strategic Plan. To meet that directive, Volume 2 of the Department's Strategic Plan for 1999 is presented here. It includes the program performance plans that…

  18. Building Technologies Program Multi-Year Program Plan Research and Development 2008

    SciTech Connect

    None, None

    2008-01-01

    Building Technologies Program Multi-Year Program Plan 2008 for research and development, including residential and commercial integration, lighting, HVAC and water heating, envelope, windows, and analysis tools.

  19. Solar index generation and delivery. Program plan

    SciTech Connect

    Lantz, L J

    1980-02-01

    The Solar Index, or, more completely defined as the Service Hot Water Solar Index, was conceptualized during the spring of 1978 with direction from a US Government interoffice agency committee, headed by the Department of Energy. The purpose was to enhance public awareness to solar energy usability. Basically, the Solar Index represents the percentage of energy that solar would provide in order to heat an 80 gallon service hot water load for a given location and day. The Index is computer by utilizing SOLCOST, a computer program, which also has applications to space heating, cooling, and heat pump systems and which supplies economic analyses for such solar energy systems. The Index is generated for approximately 75 geographic locations in the country on a daily basis. The definition of the Index, how the project came to be, what it is at the present time and a plan for the future are described. Also presented are the models used for the generation of the Index, a discussion of the primary tool of implementation (the SOLCOST program) and future efforts.

  20. GSG-GIS development program plan

    SciTech Connect

    Lee, R.C.

    1992-10-15

    For the past 40 years, the Savannah River Site (SRS) has been subjected to numerous geological and geotechnical investigations in support of facility construction and waste site development and remediation. Over this period,.a variety of different subcontractors have collected large quantities of geoscience data. In addition, current programs involve numerous investigators from different departments, and consequently, earth science data and interpretations are scattered among the departments, investigators, and subcontractors at SRS. As a result, scientific and management decisions cannot take advantage of the significant body of information that exists at SRS. Recent DOE Orders (Systematic Evaluation Program, 1991) have put specific requirements on their contractors to compile geological databases to coordinate DOE site data gathering and interpretations, and to assist in compiling safety analysis reports. The Earth Science Advisory Committee and the Environmental Advisory Committee have also made specific recommendations on the management of SRS geoscience data. This plan describes a management system to identify, communicate, and compile SRS geological (including geohydrologic), seismological, and geotechnical (656) data and interpretations on a Geographic Information System (GIS).

  1. Regional monitoring program for the Galveston Bay plan. Final report

    SciTech Connect

    Lane, W.G.

    1994-11-01

    National Estuary Program guidance requires the development of a detailed Environmental Monitoring Plan, as a separate support document to be submitted as a supplement to The Galveston Bay Plan. The two major goals for monitoring work as defined in EPA guidance are: (1) to measure the effectiveness of the management plan`s actions and objectives; and (2) to provide essential information that can be used to redirect and focus actions implemented under The Plan as they are actually carried out.

  2. Planning for Life. A Compendium of Nationally Recognized Career Planning Programs.

    ERIC Educational Resources Information Center

    National Consortium of State Career Guidance Supervisors, Columbus, OH.

    This compendium, which is designed to provide readers with a variety of career planning (CP) program ideas, contains abstracts summarizing 10 elementary, middle, and high school CP programs identified as exemplary by a national review team. Explained in chapter 1 are the primary objectives of the Planning for Life program, which is jointly…

  3. Savannah River Site Environmental Implementation Plan. Volume 2, Protection programs

    SciTech Connect

    Not Available

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  4. Review of NASA's Planned Mars Program

    NASA Technical Reports Server (NTRS)

    1996-01-01

    The exploration of Mars has long been a prime scientific objective of the U.S. planetary exploration program. Yet no U.S. spacecraft has successfully made measurements at Mars since the Viking missions of the late 1970s. Mars Observer, which was designed to conduct global observations from orbit, failed just before orbit insertion in 1993. The Russian spacecraft Phobos 2 did succeed in making some observations of the planet in 1989, but it was designed primarily to observe Phobos, the innermost satellite of Mars; the spacecraft failed 2 months after insertion into Mars orbit during the complex maneuvers required to rendezvous with the martian satellite. In fall 1996 NASA plans to launch Mars Pathfinder for a landing on the martian surface in mid-1997. This spacecraft is one of the first two missions in NASA's Discovery program that inaugurates a new style of planetary exploration in which missions are low-cost (less than $150 million) and have very focused science objectives. As can be seen in the comparative data presented in Box 1, this mission is considerably smaller in terms of cost, mass, and scope than NASA's previous Mars missions. NASA's FY 1995 budget initiated a continuing Mars exploration program, called Mars Surveyor, that involves multiple launches of spacecraft as small as or smaller than Mars Pathfinder to Mars over the next several launch opportunities, which recur roughly every 26 months. The first mission in the program, Mars Global Surveyor, set for launch late in 1996, is intended to accomplish many of the objectives of the failed Mars Observer. Like the Discovery program, Mars Surveyor is a continuing series of low-cost missions, each of which has highly focused science objectives. See Box 1 for comparative details of those Surveyor missions currently defined. Around the same time that the Mars Surveyor series was chosen as the centerpiece of NASA's solar system exploration program, the Committee on Planetary and Lunar Exploration (COMPLEX

  5. Endocrine Disruptor Screening Program (EDSP) Comprehensive Management Plans

    EPA Pesticide Factsheets

    The EDSP Comprehensive Management Plan describes the technical review processes that will be used in implementing this program and how the agency intends to factor technology advancements into the program.

  6. QA program plan plutonium stabilization and handling project W-460

    SciTech Connect

    SCHULTZ, J.W.

    1999-09-02

    This Quality Assurance Program Plan (QAPP) identifies Project Quality Assurance (QA) program requirements for all parties participating in the design, procurement, demolition, construction, installation, inspection and testing for Project W-460.

  7. 7 CFR 1215.40 - Programs, plans, and projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... PROMOTION, RESEARCH, AND CONSUMER INFORMATION Popcorn Promotion, Research, and Consumer Information Order Promotion, Research, Consumer Information, and Industry Information § 1215.40 Programs, plans, and projects... appropriate programs for promotion, research, consumer information, and industry information with respect...

  8. NASA Year 2000 (Y2K) Program Plan

    NASA Technical Reports Server (NTRS)

    1998-01-01

    NASA initiated the Year 2000 (Y2K) program in August 1996 to address the challenges imposed on Agency software, hardware, and firmware systems by the new millennium. The Agency program is centrally managed by the NASA Chief Information Officer, with decentralized execution of program requirements at each of the nine NASA Centers, Headquarters and the Jet Propulsion Laboratory. The purpose of this Program Plan is to establish Program objectives and performance goals; identify Program requirements; describe the management structure; and detail Program resources, schedules, and controls. Project plans are established for each NASA Center, Headquarters, and the Jet Propulsion Laboratory.

  9. Exploration Technology Program plans and directions

    NASA Astrophysics Data System (ADS)

    Aldrich, A.; Rosen, R.; Craig, M.; Mankins, J. C.

    During the first part of the next century, the United States will return to the Moon to create a permanent lunar base, and, before the year 2019, we will send a human mission to Mars. In addition to these human operations, the Space Exploration Initiative will integrally incorporate robotic lunar and Mars missions. In achieving these efforts to expand human presence and activity in space and also exerted and frontiers of human knowledge, the SEI will require an array of new technologies. Mission architecture definition is still underway, but previous studies indicate that the SEI will require developments in areas such as advanced engines for space transportation, in-space assembly and construction to support permanent basing of exploration systems in space, and advanced surface operations capabilities including adequate levels of power and surface roving vehicles, and technologies to support safely long-duration human operations in space. Plans are now being put into place to implement an Exploration Technology Program (ETP) which will develop the major technologies needed for SEI. In close coordination with other ongoing U.S. government research and development efforts, the ETP will provide in the near term clear demonstrations of potential exploration technologies, research results to support SEI architecture decisions, and a foundation of mature technology that is ready to be applied in the first round of SEI missions. In addition to the technology needed for the first round of SEI missions, the ETP will also put in place a foundation of research for longer-term technology needs—ultimately leading the human missions to Mars. The Space Exploration Initiative and the Exploration Technology Program will challenge the best and the brightest minds across government, industry and academia, inspiring students of all ages and making possible future terrestial applications of SEI technologies that may create whole new industries for the future.

  10. Emergency Planning and Right to Know Programs

    EPA Pesticide Factsheets

    Describes how the Emergency Planning and Community Right-to-Know Act (EPCRA) improves community access to information about chemical hazards and facilitates the development of chemical emergency response plans by tribal governments.

  11. Planning for Career Education Programs: Guidelines for Local Planners.

    ERIC Educational Resources Information Center

    Iowa State Dept. of Public Instruction, Des Moines. Div. of Career Education.

    The guidelines for planning career education programs revolve around gathering valid and comprehensive data. The career education planning model involves determining people's needs, available resources, and alternatives; establishing policies and practices; writing objectives and plans; and evaluating the results. The document, in outline form,…

  12. Method and the Muse: Planning a School Arts Program.

    ERIC Educational Resources Information Center

    Burgard, Ralph

    The document stresses that planning is essential to introduce arts programs into the schools and provides suggestions for the planning process. Elements of a good planning process include clearly stated goals and objectives, efficient use of existing resources, a survey of local conditions, involvement of influential school officials and community…

  13. Well-planning programs give students field-like experience

    SciTech Connect

    Sifferman, T.R.; Chapman, L.

    1983-01-01

    The University of Tulsa recently was given a package of computer well planning and drilling programs that will enable petroleum engineering students to gain valuable experience in designing well programs while still in school. Comprehensive homework assignments are now given in areas of drilling fluids programing, hydraulics, directional wells and surveying. Additional programs are scheduled for next semester.

  14. Program Master Plan: Federal Center for Correctional Research.

    ERIC Educational Resources Information Center

    Groder, Martin G.; Brewer, R. D.

    This revised yet still preliminary version of the Program Master Plan introduces the program with regard to location, physical characteristics, population characteristics, organizational structure and staffing patterns, and a statement of the mission for both the Mental Health and Correctional Program Units. Program principles are listed both…

  15. 10 CFR 603.885 - Updated program plans and budgets.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Updated program plans and budgets. 603.885 Section 603.885... program plans and budgets. In addition to reports on progress to date, a TIA may include a provision... effort and a revised budget if there is a significant change from the initial budget....

  16. OCCUPATIONAL EDUCATION--PLANNING AND PROGRAMMING. VOLUME TWO.

    ERIC Educational Resources Information Center

    KOTZ, ARNOLD

    ADDITIONAL POSITION PAPERS BASED ON INFORMATION GATHERED IN THE RECONNAISSANCE SURVEYS OF PLANNING AND PROGRAMING IN OCCUPATIONAL EDUCATION, REPORTED IN VOLUME ONE (VT 005 041), ARE PRESENTED. PART IV, CONCERNED WITH PROGRAM STRUCTURE AND BUDGETING AND THEIR RELATION TO THE PLANNING PROCESS, INCLUDES THE PAPERS--(1) "CURRENT POLICIES AND…

  17. How to Plan an Effective School Communications Program.

    ERIC Educational Resources Information Center

    St. John, Walter

    1983-01-01

    Describes in sequence the key considerations involved in planning an effective program for communications among a school's staff members. Covers program goals, communications needs analysis, responsibility, credibility, communications rights of employees, necessary attitudes, planning steps, appropriate channels and network patterns,…

  18. An Aid for Planning Programs in Career Education.

    ERIC Educational Resources Information Center

    Illinois State Board of Vocational Education and Rehabilitation, Springfield. Div. of Vocational and Technical Education.

    Offered as an aid for developing sequential occupational education programs, the publication presents a concept in career education planning beginning with kindergarten and continuing through adult years. Career education goals are defined, and steps in planning sequential programs are outlined as follows: (1) organization of the occupational…

  19. 7 CFR 22.304 - Multiyear planning and programming.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 1 2014-01-01 2014-01-01 false Multiyear planning and programming. 22.304 Section 22.304 Agriculture Office of the Secretary of Agriculture RURAL DEVELOPMENT COORDINATION Roles and Responsibilities of State Governments § 22.304 Multiyear planning and programming. State and multicounty...

  20. 7 CFR 22.304 - Multiyear planning and programming.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 1 2011-01-01 2011-01-01 false Multiyear planning and programming. 22.304 Section 22.304 Agriculture Office of the Secretary of Agriculture RURAL DEVELOPMENT COORDINATION Roles and Responsibilities of State Governments § 22.304 Multiyear planning and programming. State and multicounty...

  1. 7 CFR 22.304 - Multiyear planning and programming.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 1 2013-01-01 2013-01-01 false Multiyear planning and programming. 22.304 Section 22.304 Agriculture Office of the Secretary of Agriculture RURAL DEVELOPMENT COORDINATION Roles and Responsibilities of State Governments § 22.304 Multiyear planning and programming. State and multicounty...

  2. 7 CFR 22.304 - Multiyear planning and programming.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 1 2012-01-01 2012-01-01 false Multiyear planning and programming. 22.304 Section 22.304 Agriculture Office of the Secretary of Agriculture RURAL DEVELOPMENT COORDINATION Roles and Responsibilities of State Governments § 22.304 Multiyear planning and programming. State and multicounty...

  3. 7 CFR 22.304 - Multiyear planning and programming.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Multiyear planning and programming. 22.304 Section 22.304 Agriculture Office of the Secretary of Agriculture RURAL DEVELOPMENT COORDINATION Roles and Responsibilities of State Governments § 22.304 Multiyear planning and programming. State and...

  4. 49 CFR 236.905 - Railroad Safety Program Plan (RSPP).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Railroad Safety Program Plan (RSPP). 236.905 Section 236.905 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD... for Processor-Based Signal and Train Control Systems § 236.905 Railroad Safety Program Plan (RSPP)....

  5. 49 CFR 236.905 - Railroad Safety Program Plan (RSPP).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Railroad Safety Program Plan (RSPP). 236.905 Section 236.905 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD... for Processor-Based Signal and Train Control Systems § 236.905 Railroad Safety Program Plan (RSPP)....

  6. 49 CFR 236.905 - Railroad Safety Program Plan (RSPP).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Railroad Safety Program Plan (RSPP). 236.905 Section 236.905 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD... for Processor-Based Signal and Train Control Systems § 236.905 Railroad Safety Program Plan (RSPP)....

  7. Operational Environmental Monitoring Program Quality Assurance Project Plan

    SciTech Connect

    Perkins, C.J.

    1994-08-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and operational environmental monitoring performed by Westinghouse Hanford Company as it implements the Operational Environmental Monitoring program. This plan applies to all sampling and monitoring activities performed by Westinghouse Hanford Company in implementing the Operational Environmental Monitoring program at the Hanford Site.

  8. Program Planning: The Neglected Dimension of Service-Learning

    ERIC Educational Resources Information Center

    Sandmann, Lorilee R.; Kiely, Richard C.; Grenier, Robin S.

    2009-01-01

    While service-learning has distinguished itself in the literature as a problem-based experiential alternative to dominant classroom-based, subject-centered pedagogies, there is a strange absence of research based on program planning theory. This work introduces program planning theory to the field of service-learning and reports findings from a…

  9. Planning Student Flow with Linear Programming: A Tunisian Case Study.

    ERIC Educational Resources Information Center

    Bezeau, Lawrence

    A student flow model in linear programming format, designed to plan the movement of students into secondary and university programs in Tunisia, is described. The purpose of the plan is to determine a sufficient number of graduating students that would flow back into the system as teachers or move into the labor market to meet fixed manpower…

  10. 77 FR 52614 - Pre-Existing Condition Insurance Plan Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-30

    ... HUMAN SERVICES 45 CFR Part 152 RIN 0938-AQ70 Pre-Existing Condition Insurance Plan Program AGENCY... regarding program eligibility to the interim final regulation implementing the Pre- Existing Condition Plan... provide immediate access to coverage for eligible uninsured Americans with pre-existing...

  11. National Civil Applications Program: strategic plan vision for 2005

    USGS Publications Warehouse

    ,

    2004-01-01

    The National Mapping Division (NMD) has developed this comprehensive strategic plan to chart the course of the National Civil Applications Program (NCAP) over the next 5 years. To meet the challenges of the future, the NCAP is changing its program emphases, methods of responding to customer needs, and business practices. The NCAP Strategic Plan identifies the new direction for the program through a series of strategic thrusts and goals for managers to use in formulating plans, establishing program emphases, and determining resource needs and allocations.

  12. Maryland Cleaning & Abatement Services Corp. Information Sheet

    EPA Pesticide Factsheets

    Maryland Cleaning & Abatement Services Corp. (the Company) is located in Baltimore, Maryland. The settlement involves renovation activities conducted at property constructed prior to 1978, located in Baltimore, Maryland.

  13. A Plan for Developing a Need Responsive Five Year Program Plan and a Handbook for Systematic Program Development and Monitoring.

    ERIC Educational Resources Information Center

    Goddu, Roland

    This document outlines the steps necessary for the development and implementation of a five-year plan for an educational system. It first presents a framework for a five year program plan which includes a yearly statement of the goals of the organization, review or evaluation of the program, a yearly statement of priorities, determination of…

  14. Developmental Training Program: Individual Educational Plan/Individual Transitional Plan.

    ERIC Educational Resources Information Center

    Educational Service Unit #9, Hastings, NE.

    The curriculum model and implementation procedures outlined in this manual for the Developmental Training Program for students with disabilities are based on two trends: the emphasis upon teaching functional skills in the natural environment and the need for educational programs which demonstrate measurability, reportability, and accountability.…

  15. Developmental Training Program: Individual Educational Plan/Individual Transitional Plan.

    ERIC Educational Resources Information Center

    Educational Service Unit #9, Hastings, NE.

    The curriculum model and implementation procedures outlined in this manual for the Developmental Training Program for students with disabilities are based on two trends: the emphasis upon teaching functional skills in the natural environment and the need for educational programs which demonstrate measurability, reportability, and accountability.…

  16. History of the Chinese Family Planning program: 1970-2010.

    PubMed

    Wang, Cuntong

    2012-06-01

    China launched a nationwide family planning program offering birth control methods and family planning services in the 1970s. Promotion of the widespread use of long-term contraceptive methods has been one of the program's core strategies. This paper reviews the history of China's Family Planning Program at the national level from 1970 to 2010. Special attention is paid to the history of contraception policy. This study provides an overview of the last four decades of the Chinese Family Planning Program. Programmatic goals are highlighted during different time periods, with special attention being paid to the role of contraceptive use and the history of contraceptive policy. The Chinese Family Planning Program has experienced several transitions. It has evolved from the 1970s period of moderate policy, represented by wan, xi, shao (late marriage and childbearing, birth spacing and limited fertility), through the strict one-child policy of 1979 to the early 1990s. From the mid-1990s to the present, a relatively lenient policy has been in force, characterized by client-centered informed choice. The success of the Chinese Family Planning Program has long been heavily dependent on policies advocated by the central government, including programs promoting contraception to reduce fertility rates. The Program also depended on a logistical support system, including organizational safeguards and free provision of contraception and family planning services. Copyright © 2012 Elsevier Inc. All rights reserved.

  17. Student Academic Achievement Plan: An Assessment Plan and Program. Revised.

    ERIC Educational Resources Information Center

    Front Range Community Coll., Westminster, CO.

    This report describes student academic achievement assessment activities at Front Range Community College (FRCC) (Colorado). According to this plan, all major decisions within the college will be based on four strategic initiatives: quality of student experience; excellence of human resources; college flexibility and responsibility; and…

  18. Planning a Program of School Plant Construction. Research Report, School Plant Planning Series.

    ERIC Educational Resources Information Center

    Utah State Board of Education, Salt Lake City.

    The importance of long-term planning, and undesirable conditions resulting from failure to plan, are stressed. General procedures named as essential are--(1) the official approval of the Board of Education before the administration proceeds with long-range planning, (2) the design of the school plant around the educational program it is to serve,…

  19. The NASA Space Station program plans

    NASA Technical Reports Server (NTRS)

    Freitag, R. F.

    1984-01-01

    The design of a permanently manned space station is discussed. The role of the space shuttle, planning guidelines, international cooperation, and commercial possibilities are among the topics discussed.

  20. Sandia wind program FY94 annual operating plan

    SciTech Connect

    Dodd, H.M.

    1993-10-01

    This document presents the objectives, accomplishments and activity plan for the Sandia Wind Energy Technology Program. The status of the current program is summarized and the planned FY94 activities are defined. Appendices detailing the cost, performance and schedule associated with these activities are also included. Funding requirements are given for several scenarios in order to reflect the impact of funding variability on program progress.

  1. Program Plan: field radionuclide migration studies in Climax granite

    SciTech Connect

    Isherwood, D.; Raber, E.; Coles, D.; Stone, R.

    1980-11-01

    This Program Plan describes the field radionuclide migration studies we plan to conduct in the Climax granite at the Nevada Test Site. Laboratory support studies are included to help us understand the geochemical and hydrologic processes involved in the field. The Program Plan begins with background information (Section 1) on how this program fits into the National Waste Terminal Storage Program Plan and discusses the needs for field studies of this type. The objectives stated in Section 2 are in direct response to these needs, particularly the need to determine whether laboratory studies accurately reflect actual field conditions and the need for field testing to provide a data base for verification of hydrologic and mass transport models. The technical scope (Section 3) provides a work breakdown structure that integrates the various activities and establishes a base for the technical approach described in Section 4. Our approach combines an interactive system of field and laboratory migration experiments with the use of hydrologic models for pre-test predictions and data interpretation. Section 5 on program interfaces identifies how information will be transferred to other related DOE projects. A schedule of activities and major milestones (Section 6) and the budget necessary to meet the project objectives (Section 7) are included in the Program Plan. Sections 8 and 9 contain brief descriptions of how the technical and program controls will be established and maintained and an outline of our quality assurance program. This program plan is an initial planning document and provides a general description of activities. An Engineering Test Plan containing detailed experimental test plans, an instrumentation plan and equipment design drawings will be published as a separate document.

  2. Light Water Reactor Sustainability Program Integrated Program Plan

    SciTech Connect

    George Griffith; Robert Youngblood; Jeremy Busby; Bruce Hallbert; Cathy Barnard; Kathryn McCarthy

    2012-01-01

    Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 70%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to experience a 31% growth from 2009 to 2035. At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license for a total of 60 years of operation. Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity. If current operating nuclear power plants do not operate beyond 60 years, the total fraction of generated electrical energy from nuclear power will begin to decline - even with the expected addition of new nuclear generating capacity. The oldest commercial plants in the United States reached their 40th anniversary in 2009. The U.S. Department of Energy Office of Nuclear Energy's Research and Development Roadmap (Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: (1) develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; (2) develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration's energy security and climate change goals; (3) develop sustainable nuclear fuel cycles; and (4) understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program's plans.

  3. Public Relations for Brazilian Libraries: Process, Principles, Program Planning, Planning Techniques and Suggestions.

    ERIC Educational Resources Information Center

    Kies, Cosette N.

    A brief overview of the functions of public relations in libraries introduces this manual, which provides an explanation of the public relations (PR) process, including fact-finding, planning, communicating, evaluating, and marketing; some PR principles; a 10-step program that could serve as a model for planning a PR program; a discussion of PR…

  4. Computer Applications Planning. A Guide to Planning and Implementing a District-Wide Computer Program.

    ERIC Educational Resources Information Center

    Mojkowski, Charles

    Designed to help school districts move from exploring the use of computers in the classroom to the comprehensive planning and development of computer education programs, this guide is organized around five steps essential to the process of developing a district program. Phase 1 includes the following preliminary activities involved in planning for…

  5. Active Sites Environmental Monitoring Program: Program plan. Revision 1

    SciTech Connect

    Ashwood, T.L.; Wickliff, D.S.; Morrissey, C.M.

    1992-02-01

    The Active Sites Environmental Monitoring Program (ASEMP), initiated in 1989, provides early detection and performance monitoring of transuranic (TRU) waste and active low-level waste (LLW) facilities at Oak Ridge National Laboratory (ORNL) in accordance with US Department of Energy (DOE) Order 5820.2A. Active LLW facilities in Solid Waste Storage Area (SWSA) 6 include Tumulus I and Tumulus II, the Interim Waste Management Facility (IWMF), LLW silos, high-range wells, asbestos silos, and fissile wells. The tumulus pads and IWMF are aboveground, high-strength concrete pads on which concrete vaults containing metal boxes of LLW are placed; the void space between the boxes and vaults is filled with grout. Eventually, these pads and vaults will be covered by an engineered multilayered cap. All other LLW facilities in SWSA 6 are below ground. In addition, this plan includes monitoring of the Hillcut Disposal Test Facility (HDTF) in SWSA 6, even though this facility was completed prior to the data of the DOE order. In SWSA 5 North, the TRU facilities include below-grade engineered caves, high-range wells, and unlined trenches. All samples from SWSA 6 are screened for alpha and beta activity, counted for gamma-emitting isotopes, and analyzed for tritium. In addition to these analytes, samples from SWSA 5 North are analyzed for specific transuranic elements.

  6. Planning Programming Budgeting Systems: PPBS and Education.

    ERIC Educational Resources Information Center

    Katzenbach, Edward L.

    Continuous change in education is requiring educational administrators to plan for the distant future with as much precision as they now do for the immediate future. Recently, major advances in the planning-budgeting process have become available to educators in the form of PPBS. Fiduciary budgets, which have been used in most schools since the…

  7. Lunar-Ultraviolet Telescope Experiment (LUTE) integrated program plan

    NASA Technical Reports Server (NTRS)

    Smith, Janice F. (Compiler); Forrest, Larry

    1993-01-01

    A detailed Lunar Ultraviolet Telescope Experiment (LUTE) program plan representing major decisions and tasks leading to those decisions for program execution are presented. The purpose of this task was to develop an integrated plan of project activities for the LUTE project, and to display the plan as an integrated network that shows the project activities, all critical interfaces, and schedules. The integrated network will provide the project manager with a frame work for strategic planning and risk management throughout the life of the project.

  8. Timber management planning with timber ram and goal programming

    Treesearch

    Richard C. Field

    1978-01-01

    By using goal programming to enhance the linear programming of Timber RAM, multiple decision criteria were incorporated in the timber management planning of a National Forest in the southeastern United States. Combining linear and goal programming capitalizes on the advantages of the two techniques and produces operationally feasible solutions. This enhancement may...

  9. Program Planning for Research Libraries in a University Setting.

    ERIC Educational Resources Information Center

    Mason, Thomas R.

    The Planning-Programing-Budgeting System (PPBS) uses techniques of systems analysis, cost-benefit analysis, and program budgeting in the administration of large, complex organizations. Some university administrators hope to improve their institutions' internal management through the PPBS approach. The basic program categories of the university are…

  10. FFTF-cycle 10 program and future plan

    NASA Astrophysics Data System (ADS)

    Kohyama, Akira

    1988-04-01

    Brief outlines are provided of the FFTF cycle 10 program and future plans in consideration. The primary objective of the Japan-US collaboration program is to enable predictions of material behavior in MFRs to be made from data obtained in other irradiation environments. Major program goals are outlined.

  11. Individualized Program Planning (IPP): ECS to Grade 12. Programming for Students with Special Needs

    ERIC Educational Resources Information Center

    Online Submission, 2006

    2006-01-01

    This resource is a revision of the teaching resource Individualized Program Plans (1995), Book 3 (ED392232) in the Programming for Students with Special Needs series. It aims to create a bridge between the product, the process and the underlying vision of Individualized Program Planning (IPP). The Standards for Special Education (Amended June…

  12. Review of NASA's Planned Mars Program

    NASA Technical Reports Server (NTRS)

    1996-01-01

    Contents include the following: Executive Summary; Introduction; Scientific Goals for the Exploration of Mars; Overview of Mars Surveyor and Others Mars Missions; Key Issues for NASA's Mars Exploration Program; and Assessment of the Scientific Potential of NASA's Mars Exploration Program.

  13. AHERA CLEARANCE AT TWENTY ABATEMENT SITES

    EPA Science Inventory

    A study was conducted during the summer of 1988 to document Asbestos Hazard Emergency Response Act (AHERA) clearance air-sampling practices and clearance concentrations of airborne asbestos at 20 asbestos-abatement sites in New Jersey. Each abatement took place in a school buildi...

  14. Definition of space shuttle program plan, study

    NASA Technical Reports Server (NTRS)

    1971-01-01

    The preliminary definition of an economical space shuttle program in which the evolution to full operational capability is achieved through phased subsystem development is presented. The following aspects of the program are discussed: (1) definition of system and subsystem configurations, (2) definition of phased evolution to final configuration, (3) analysis of design, test, cost, and schedule requirements, (4) definition of candidate booster designs and programs to facilitate selection, and (5) definition of program, system, and vehicle requirements.

  15. A GUIDE FOR HEALTH TECHNOLOGY PROGRAM PLANNING.

    ERIC Educational Resources Information Center

    KAHLER, CAROL; AND OTHERS

    THIS GUIDE TO THE PREPARATION OF A 2-YEAR COLLEGE PROGRAM IN HEALTH TECHNOLOGY LISTS CERTAIN NECESSARY PRE-CONDITIONS. BEFORE THE COURSE CAN BE ESTABLISHED, THE ADMINISTRATION MUST (1) DEFINE THE SCOPE OF THE PROGRAM, (2) BE AWARE OF ACCEPTED STANDARDS FOR TECHNICIANS IN THE HEALTH FIELD, (3) NOTE THE POSSIBLE IMPACT OF THE PROGRAM ON THE…

  16. Planning Evaluation through the Program Life Cycle

    ERIC Educational Resources Information Center

    Scheirer, Mary Ann; Mark, Melvin M.; Brooks, Ariana; Grob, George F.; Chapel, Thomas J.; Geisz, Mary; McKaughan, Molly; Leviton, Laura

    2012-01-01

    Linking evaluation methods to the several phases of a program's life cycle can provide evaluation planners and funders with guidance about what types of evaluation are most appropriate over the trajectory of social and educational programs and other interventions. If methods are matched to the needs of program phases, evaluation can and should…

  17. Planning Evaluation through the Program Life Cycle

    ERIC Educational Resources Information Center

    Scheirer, Mary Ann; Mark, Melvin M.; Brooks, Ariana; Grob, George F.; Chapel, Thomas J.; Geisz, Mary; McKaughan, Molly; Leviton, Laura

    2012-01-01

    Linking evaluation methods to the several phases of a program's life cycle can provide evaluation planners and funders with guidance about what types of evaluation are most appropriate over the trajectory of social and educational programs and other interventions. If methods are matched to the needs of program phases, evaluation can and should…

  18. HTGR generic technology program plan (FY 80)

    SciTech Connect

    Not Available

    1980-01-01

    Purpose of the program is to develop base technology and to perform design and development common to the HTGR Steam Cycle, Gas Turbine, and Process Heat Plants. The generic technology program breaks into the base technology, generic component, pebble-bed study, technology transfer, and fresh fuel programs. (DLC)

  19. Adaptation Planning for the National Estuary Program

    EPA Pesticide Factsheets

    This document is a resource for coastal communities to start planning to adapt to climate change. It describes elements, such as vulnerability assessments and stakeholder outreach, and provides examples as well as suggestions for additional resources.

  20. Solar Terrestrial programs: A five year plan

    NASA Technical Reports Server (NTRS)

    Stern, D. P.

    1978-01-01

    Major projects to be initiated in the 1980-1985 period, designed to study the Sun, the heliosphere, Earth's magnetosphere, and the upper atmosphere involve the use of spacelab as well as free flying spacecraft. Current and recent investigations in these areas are reviewed and the guiding principles followed in planning future missions are examined. The implementation strategy, the planning process, and supporting research and technology are discussed.

  1. Light Water Reactor Sustainability Program Integrated Program Plan

    SciTech Connect

    Kathryn McCarthy; Jeremy Busby; Bruce Hallbert; Shannon Bragg-Sitton; Curtis Smith; Cathy Barnard

    2013-04-01

    Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 70%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to experience a 31% growth from 2009 to 2035. At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license for a total of 60 years of operation. Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity. If current operating nuclear power plants do not operate beyond 60 years, the total fraction of generated electrical energy from nuclear power will begin to decline—even with the expected addition of new nuclear generating capacity. The oldest commercial plants in the United States reached their 40th anniversary in 2009. The U.S. Department of Energy Office of Nuclear Energy’s Research and Development Roadmap (Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: (1) develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; (2) develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration’s energy security and climate change goals; (3) develop sustainable nuclear fuel cycles; and (4) understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program’s plans.

  2. Light Water Reactor Sustainability Program Integrated Program Plan

    SciTech Connect

    McCarthy, Kathryn A.; Busby, Jeremy; Hallbert, Bruce; Bragg-Sitton, Shannon; Smith, Curtis; Barnard, Cathy

    2014-04-01

    Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 70%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to experience a 31% growth from 2009 to 2035. At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license for a total of 60 years of operation. Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity. If current operating nuclear power plants do not operate beyond 60 years, the total fraction of generated electrical energy from nuclear power will begin to decline—even with the expected addition of new nuclear generating capacity. The oldest commercial plants in the United States reached their 40th anniversary in 2009. The U.S. Department of Energy Office of Nuclear Energy’s Research and Development Roadmap (Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: (1) develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; (2) develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration’s energy security and climate change goals; (3) develop sustainable nuclear fuel cycles; and (4) understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program’s plans.

  3. Civilian radioactive waste management program plan. Revision 2

    SciTech Connect

    1998-07-01

    This revision of the Civilian Radioactive Waste Management Program Plan describes the objectives of the Civilian Radioactive Waste management Program (Program) as prescribed by legislative mandate, and the technical achievements, schedule, and costs planned to complete these objectives. The Plan provides Program participants and stakeholders with an updated description of Program activities and milestones for fiscal years (FY) 1998 to 2003. It describes the steps the Program will undertake to provide a viability assessment of the Yucca Mountain site in 1998; prepare the Secretary of Energy`s site recommendation to the President in 2001, if the site is found to be suitable for development as a repository; and submit a license application to the Nuclear Regulatory Commission in 2002 for authorization to construct a repository. The Program`s ultimate challenge is to provide adequate assurance to society that an operating geologic repository at a specific site meets the required standards of safety. Chapter 1 describes the Program`s mission and vision, and summarizes the Program`s broad strategic objectives. Chapter 2 describes the Program`s approach to transform strategic objectives, strategies, and success measures to specific Program activities and milestones. Chapter 3 describes the activities and milestones currently projected by the Program for the next five years for the Yucca Mountain Site Characterization Project; the Waste Acceptance, Storage and Transportation Project; ad the Program Management Center. The appendices present information on the Nuclear Waste Policy Act of 1982, as amended, and the Energy Policy Act of 1992; the history of the Program; the Program`s organization chart; the Commission`s regulations, Disposal of High-Level Radioactive Wastes in geologic Repositories; and a glossary of terms.

  4. 7 CFR 1219.50 - Budgets, programs, plans, and projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... development of new marketing strategies; to advance the image and desirability of, increase the efficiency of... MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE..., effectuation, administration, and evaluation of programs, plans, and projects for marketing...

  5. 7 CFR 1219.50 - Budgets, programs, plans, and projects.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... development of new marketing strategies; to advance the image and desirability of, increase the efficiency of... MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE..., effectuation, administration, and evaluation of programs, plans, and projects for marketing...

  6. 7 CFR 1219.50 - Budgets, programs, plans, and projects.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... development of new marketing strategies; to advance the image and desirability of, increase the efficiency of... MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE..., effectuation, administration, and evaluation of programs, plans, and projects for marketing...

  7. 7 CFR 1219.50 - Budgets, programs, plans, and projects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... development of new marketing strategies; to advance the image and desirability of, increase the efficiency of... MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE..., effectuation, administration, and evaluation of programs, plans, and projects for marketing...

  8. 7 CFR 1209.40 - Programs, plans, and projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ....40 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE MUSHROOM... Order Promotion, Research, Consumer Information, and Industry Information § 1209.40 Programs, plans,...

  9. 7 CFR 1215.40 - Programs, plans, and projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ....40 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE POPCORN... Promotion, Research, Consumer Information, and Industry Information § 1215.40 Programs, plans, and...

  10. Federal Geothermal Program Plan for Fiscal Year 1983

    SciTech Connect

    1983-03-01

    This is an internal DOE Geothermal Program planning and control document. Many of these reports were issued only in draft form. This is a report of the Interagency Geothermal Coordinating Committee (IGCC). (DJE 2005)

  11. 7 CFR 1219.21 - Programs, plans, and projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ....21 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE HASS..., promotion, and information programs, plans, studies, or projects established pursuant to § 1219.50. ...

  12. Revised plans for Hot Dry Rock geothermal program

    SciTech Connect

    Murphy, Hugh D.

    1987-03-10

    This letter is our response to your February 13 letter directing us to respond to Headquarters' request for new HDR program plans. This request was initiated by John E. Mock, CE-342, HQ. Our response is organized as three attachments.

  13. Highly enriched uranium (HEU) storage and disposition program plan

    SciTech Connect

    Arms, W.M.; Everitt, D.A.; O`Dell, C.L.

    1995-01-01

    Recent changes in international relations and other changes in national priorities have profoundly affected the management of weapons-usable fissile materials within the United States (US). The nuclear weapon stockpile reductions agreed to by the US and Russia have reduced the national security requirements for these fissile materials. National policies outlined by the US President seek to prevent the accumulation of nuclear weapon stockpiles of plutonium (Pu) and HEU, and to ensure that these materials are subjected to the highest standards of safety, security and international accountability. The purpose of the Highly Enriched Uranium (HEU) Storage and Disposition Program Plan is to define and establish a planned approach for storage of all HEU and disposition of surplus HEU in support of the US Department of Energy (DOE) Fissile Material Disposition Program. Elements Of this Plan, which are specific to HEU storage and disposition, include program requirements, roles and responsibilities, program activities (action plans), milestone schedules, and deliverables.

  14. Weatherization and Intergovernmental Program - State Energy Program Helps States Plan and Implement Energy Efficiency

    SciTech Connect

    2010-06-01

    State energy offices use SEP funds to develop state plans that identify opportunities for adopting renewable energy and energy efficiency technologies, and implementing programs to improve energy sustainability.

  15. 1997 Operating plan for the Office of International Health Programs

    SciTech Connect

    1996-11-01

    One year ago, the Office of International Health Programs provided you with our 1996 Operating Plan, which defined our ideas and ideals for conducting business in 1996. We have again this year undertaken an intensive planning effort, first reviewing our accomplishments and shortcomings during 1996, and then developing plans and priorities for the upcoming year, taking into account input from customers and outside review panels, and ensuring that the demands on the office have been balanced with anticipated human, financial, and material resources.

  16. Kansas Plan: For Program Planning and Development in Education for the Mentally Retarded.

    ERIC Educational Resources Information Center

    Thorsell, Marguerite; And Others

    The manual of administrative guidelines outlining program organization for the education of the mentally retarded in Kansas presents standards of program organization and operation and plans for implementing specified services for the various levels of mental retardation. Part 1 of the manual, detailing program organization, covers program…

  17. Administering Adult Literacy Programs: The Role of Strategic Planning.

    ERIC Educational Resources Information Center

    Michael, Steve Olu

    In an era of rising public criticism of education and decreasing resources, strategic planning can be a major tool for educational administrators who wish to respond to the increasing challenges their adult literacy programs face. Strategic planning can be defined as a disciplined effort to produce fundamental decisions and actions that shape and…

  18. Modeling a Program Planning Process for Vocational Education.

    ERIC Educational Resources Information Center

    Southeast Community Coll., Lincoln, NE.

    This guide, which derives from planning work at Southeast Community College (Nebraska), is designed to improve the practice of vocational program planning at the postsecondary level. After an overview is provided in the first section, a compilation of seven separate categories is presented which deals with gathering needed information for…

  19. Planning, Conducting, and Documenting Data Analysis for Program Improvement

    ERIC Educational Resources Information Center

    Winer, Abby; Taylor, Cornelia; Derrington, Taletha; Lucas, Anne

    2015-01-01

    This 2015 document was developed to help technical assistance (TA) providers and state staff define and limit the scope of data analysis for program improvement efforts, including the State Systemic Improvement Plan (SSIP); develop a plan for data analysis; document alternative hypotheses and additional analyses as they are generated; and…

  20. A Life Planning Program for the Working Woman.

    ERIC Educational Resources Information Center

    Aanstad, Judy; Borders, DiAnne

    This presentation describes a course, "Lifework Planning," designed to help women evaluate their current job status and plan career changes commensurate with long-range life goals. The framework for the program is self-directed learning, through which women develop coping strategies for change. Participants and leaders make mutual decisions…

  1. Planning, Conducting, and Documenting Data Analysis for Program Improvement

    ERIC Educational Resources Information Center

    Winer, Abby; Taylor, Cornelia; Derrington, Taletha; Lucas, Anne

    2015-01-01

    This 2015 document was developed to help technical assistance (TA) providers and state staff define and limit the scope of data analysis for program improvement efforts, including the State Systemic Improvement Plan (SSIP); develop a plan for data analysis; document alternative hypotheses and additional analyses as they are generated; and…

  2. 33 CFR 385.25 - Program Management Plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Program Management Plans. 385.25 Section 385.25 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROGRAMMATIC REGULATIONS FOR THE COMPREHENSIVE EVERGLADES RESTORATION PLAN CERP Implementation...

  3. 33 CFR 385.25 - Program Management Plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Program Management Plans. 385.25 Section 385.25 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROGRAMMATIC REGULATIONS FOR THE COMPREHENSIVE EVERGLADES RESTORATION PLAN CERP Implementation...

  4. 33 CFR 385.25 - Program Management Plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Program Management Plans. 385.25 Section 385.25 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROGRAMMATIC REGULATIONS FOR THE COMPREHENSIVE EVERGLADES RESTORATION PLAN CERP Implementation...

  5. 33 CFR 385.25 - Program Management Plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Program Management Plans. 385.25 Section 385.25 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROGRAMMATIC REGULATIONS FOR THE COMPREHENSIVE EVERGLADES RESTORATION PLAN CERP Implementation...

  6. 33 CFR 385.25 - Program Management Plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Program Management Plans. 385.25 Section 385.25 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROGRAMMATIC REGULATIONS FOR THE COMPREHENSIVE EVERGLADES RESTORATION PLAN CERP Implementation...

  7. Program Planning Guide for Florida Vocational Home Economics Education.

    ERIC Educational Resources Information Center

    Todd, Larry, Ed.

    The planning guide contains basic materials that are being used in vocational home economics education. Part 1, Program Planning, discusses goals for education in the nation and Florida, homemaking as an inherent component of vocational education, and vocational home economics (guidelines, funding, student organizations, and Florida goals).…

  8. 44 CFR 9.15 - Planning programs affecting land use.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY GENERAL FLOODPLAIN MANAGEMENT AND PROTECTION OF WETLANDS § 9.15 Planning programs affecting land use. The Agency shall take floodplain management into account when formulating or... flood hazards and floodplain management and wetlands protection; and (b) Prescribes planning...

  9. 44 CFR 9.15 - Planning programs affecting land use.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY GENERAL FLOODPLAIN MANAGEMENT AND PROTECTION OF WETLANDS § 9.15 Planning programs affecting land use. The Agency shall take floodplain management into account when formulating or... flood hazards and floodplain management and wetlands protection; and (b) Prescribes planning...

  10. 44 CFR 9.15 - Planning programs affecting land use.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY GENERAL FLOODPLAIN MANAGEMENT AND PROTECTION OF WETLANDS § 9.15 Planning programs affecting land use. The Agency shall take floodplain management into account when formulating or... flood hazards and floodplain management and wetlands protection; and (b) Prescribes planning...

  11. 44 CFR 9.15 - Planning programs affecting land use.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY GENERAL FLOODPLAIN MANAGEMENT AND PROTECTION OF WETLANDS § 9.15 Planning programs affecting land use. The Agency shall take floodplain management into account when formulating or... flood hazards and floodplain management and wetlands protection; and (b) Prescribes planning...

  12. 44 CFR 9.15 - Planning programs affecting land use.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY GENERAL FLOODPLAIN MANAGEMENT AND PROTECTION OF WETLANDS § 9.15 Planning programs affecting land use. The Agency shall take floodplain management into account when formulating or... flood hazards and floodplain management and wetlands protection; and (b) Prescribes planning...

  13. UH-60 Airloads Program - Status and plans

    NASA Technical Reports Server (NTRS)

    Kufeld, Robert M.; Loschke, Paul C.

    1991-01-01

    The present paper addresses the background of the UH-60 Airloads Program, the instrumentation, data requirements, and the development of the data collection and storage systems. An outline of the data points to be collected and detail of data access are presented. The Outside Experiment Program, in which researchers outside of NASA propose potential flight experiments, is described. Attention is given to the development of research systems necessary to conduct the program. Significant improvements in data acquisition, processing, and storage quality are stated as the primary objectives as dictated from lessons learned during past rotor airloads flight research programs.

  14. Integrated Technology Plan for the Civil Space Program, 1991

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The purpose of the Integrated Technology Plan (ITP) is to serve as a strategic plan for the OAST space research and technology (R&T) program, and as a strategic planning framework for other NASA and national participants in advocating and conducting technology developments that support future U.S. civil space missions. The ITP begins with a discussion of the national policy and NASA organization which establishes the overall framework for civil space R&T planning. The second chapter provides a top-level review of the potential users of civil space R&T, their strategic mission plans, and the technologies they have identified as needed to achieve those plans. The overall methodology used to develop a civil space technology strategy is discussed. The technical details of the 1991 strategic plan are described, ending with a review of civil space R&T priorities. The fourth chapter describes how the strategic plan is annually translated into the OAST Space R&T Program, with a summary of the fiscal year 1992 program. The ITP concludes with a discussion of requirements for technology development coordination and strategies for facilitating the transfer of civil space technology to the private sector. Several appendices also are attached that provide further information regarding budget implications of the strategic plan, organizational roles, and other topics.

  15. Planning guidance for the Chemical Stockpile Emergency Preparedness Program

    SciTech Connect

    Shumpert, B.L.; Watson, A.P.; Sorensen, J.H.

    1995-02-01

    This planning guide was developed under the direction of the U.S. Army and the Federal Emergency Management Agency (FEMA) which jointly coordinate and direct the development of the Chemical Stockpile Emergency Preparedness Program (CSEPP). It was produced to assist state, local, and Army installation planners in formulating and coordinating plans for chemical events that may occur at the chemical agent stockpile storage locations in the continental United States. This document provides broad planning guidance for use by both on-post and off-post agencies and organizations in the development of a coordinated plan for responding to chemical events. It contains checklists to assist in assuring that all important aspects are included in the plans and procedures developed at each Chemical Stockpile Disposal Program (CSDP) location. The checklists are supplemented by planning guidelines in the appendices which provide more detailed guidance regarding some issues. The planning guidance contained in this document will help ensure that adequate coordination between on-post and off-post planners occurs during the planning process. This planning guide broadly describes an adequate emergency planning base that assures that critical planning decisions will be made consistently at every chemical agent stockpile location. This planning guide includes material drawn from other documents developed by the FEMA, the Army, and other federal agencies with emergency preparedness program responsibilities. Some of this material has been developed specifically to meet the unique requirements of the CSEPP. In addition to this guidance, other location-specific documents, technical studies, and support studies should be used as needed to assist in the planning at each of the chemical agent stockpile locations to address the specific hazards and conditions at each location.

  16. Tandem mirror thermal barrier experimental program plan

    SciTech Connect

    Coensgen, F.H.; Drake, R.P.; Simonen, T.C.

    1980-01-02

    This report describes an experimental plan for the development of the Tandem Mirror Thermal Barrier. Included is: (1) a description of thermal barrier related physics experiments; (2) thermal barrier related experiments in the existing TMX and Phaedrus experiments; (3) a thermal barrier TMX upgrade; and (4) initiation of investigations of axisymmetric magnetic geometry. Experimental studies of the first two items are presently underway. Results are expected from the TMX upgrade by the close of 1981 and from axisymmetric tandem mirror experiments at the end of 1983. Plans for Phaedrus upgrades are developing for the same period.

  17. Planning and Implementing Health Screening Programs.

    ERIC Educational Resources Information Center

    Webster, Katherine P.

    1980-01-01

    School health screening programs, which include screening, education of children and parents, and follow-up in the form of appropriate treatment, are described. A scoliosis screening program is described as an example of the model presented. Suggestions for planners, participants, and evaluators of any school health screening are summarized. (JMF)

  18. Linear Programming With Applications to Educational Planning.

    ERIC Educational Resources Information Center

    Carman, Robert A.

    This document discusses the value of linear programing in finding minimum and maximum solutions to problems of resource allocation. Three models using this technique are given for the areas of educational finance, school district personnel compensation, and instructional program evaluation. (RA)

  19. Building Technologies Program Multi-Year Program Plan Technology Validation and Market Introduction 2008

    SciTech Connect

    None, None

    2008-01-01

    Building Technologies Program Multi-Year Program Plan 2008 for technology validation and market introduction, including ENERGY STAR, building energy codes, technology transfer application centers, commercial lighting initiative, EnergySmart Schools, EnergySmar

  20. Transuranic Waste Characterization Quality Assurance Program Plan

    SciTech Connect

    1995-04-30

    This quality assurance plan identifies the data necessary, and techniques designed to attain the required quality, to meet the specific data quality objectives associated with the DOE Waste Isolation Pilot Plant (WIPP). This report specifies sampling, waste testing, and analytical methods for transuranic wastes.

  1. Quality assurance program plan for radionuclide airborne emissions monitoring

    SciTech Connect

    Boom, R.J.

    1995-03-01

    This Quality Assurance Program Plan identifies quality assurance program requirements and addresses the various Westinghouse Hanford Company organizations and their particular responsibilities in regards to sample and data handling of airborne emissions. The Hanford Site radioactive airborne emissions requirements are defined in National Emissions Standards for Hazardous Air Pollutants (NESHAP), Code of Federal Regulations, Title 40, Part 61, Subpart H (EPA 1991a). Reporting of the emissions to the US Department of Energy is performed in compliance with requirements of US Department of Energy, Richland Operations Office Order 5400.1, General Environmental Protection Program (DOE-RL 1988). This Quality Assurance Program Plan is prepared in accordance with and to the requirements of QAMS-004/80, Guidelines and Specifications for Preparing Quality Assurance Program Plans (EPA 1983). Title 40 CFR Part 61, Appendix B, Method 114, Quality Assurance Methods (EPA 1991b) specifies the quality assurance requirements and that a program plan should be prepared to meet the requirements of this regulation. This Quality Assurance Program Plan identifies NESHAP responsibilities and how the Westinghouse Hanford Company Environmental, Safety, Health, and Quality Assurance Division will verify that the methods are properly implemented.

  2. Space shuttle maintenance program planning document

    NASA Technical Reports Server (NTRS)

    Brown, D. V.

    1972-01-01

    A means for developing a space shuttle maintenance program which will be acceptable to the development centers, the operators (KSC and AF), and the manufacturer is presented. The general organization and decision processes for determining the essential scheduled maintenance requirements for the space shuttle orbiter are outlined. The development of initial scheduled maintenance programs is discussed. The remaining maintenance, that is non-scheduled or non-routine maintenance, is directed by the findings of the scheduled maintenance program and the normal operation of the shuttle. The remaining maintenance consists of maintenance actions to correct discrepancies noted during scheduled maintenance tasks, nonscheduled maintenance, normal operation, or condition monitoring.

  3. Program planning, chapter 5, part D

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Recommendations for future activities necessary to support satellite microwave sensing are reported. Areas covered include component development, data processing, calibration, design and fabrication of multifrequency systems, and experimental test programs to establish interactions of electromagnetic waves and sensed parameters.

  4. Is Program Planning Just a Ritual?

    ERIC Educational Resources Information Center

    Durfee, Arthur E.

    1976-01-01

    The failure of supervisors to follow through with helpful interest and discussion has had a debilitating impact on too many Extension programs. The accountability aspect is explored using seven questions with which Extension professionals should be concerned. (ABM)

  5. Hazardous materials response project: program plan

    SciTech Connect

    Not Available

    1981-11-01

    The overall purpose of this Program described is to provide timely and effective deployment of scientific resources during an emergency oil or hazardous substance release to minimize environmental and socioeconomic impact.

  6. Inspection Methods in Programming: Cliches and Plans.

    DTIC Science & Technology

    1987-12-01

    PROGRAM ELEMENT. PROJECT. TASK Artificial Inteligence Laboratory AREA & WORK UN IT NUMBERS J 545 Technology Square Cambridge, MA 02139 $L. CONTROLLING...attest, operations on program text, such as concatentat ion and substitution, are in general a quite tricky business . Typical problems in- clude...number I absolute-value normalize: - output:number Compare ureaterum er sserm:number dss -fthan =TIM Fequality-within- tolerance Figure 14. The three

  7. Program Development Plan and Team up

    SciTech Connect

    Solar Electric Power Association

    2001-12-01

    The final summary report is a comprehensive view of TEAM-UP, with documented data, information, and experiences that SEPA has collected throughout the program, including lessons learned by participating ventures, and sections covering costs and other information on both large and small systems. This report also covers the barriers that TEAM-UP faced to PV commercialization at the beginning of the program, barriers the project was able to remove or reduce, and what barriers remain on the road ahead.

  8. Performance Assessment Strategy Plan for the Geologic Repository Program

    SciTech Connect

    1990-01-01

    Performance assessment is a major constituent of the program being conducted by the US Department of Energy (DOE) to develop a geologic repository. Performance assessment is the set of activities needed for quantitative evaluations to assess compliance with the performance requirements in the regulations for a geologic repository and to support the development of the repository. The strategy for these evaluations has been documented in the Performance Assessment Strategy Plan (DOE, 1989). The implementation of the performance assessment strategy is defined in this document. This paper discusses the scope and objectives of the implementation plan, the relationship of the plan to other program plans, summarizes the performance assessment areas and the integrated strategy of the performance assessment program. 1 fig., 3 tabs.

  9. Geochemical engineering and materials program plan

    SciTech Connect

    1982-08-01

    The Department of Energy (DOE) was designated as lead agency in discharging the overall legislative mandate for federal R&D to assist the private sector in developing appropriate technology for exploiting geothermal energy resources. The Geochemical Engineering and Materials (GEM) Program was conceived, as part of DOE'S overall strategy, to address specific and plant-wide problems and uncertainties in the use of materials and in geochemical engineering. This program assists industry in the conduct of long-term,high-risk R&D needed to overcome the significant technical and economic GEM-related obstacles faced by developers and potential developers of this alternative energy source. The program focuses on: (1) Increasing the knowledge about the properties of materials and their performance under geothermal energy system conditions; (2) Developing and utilizing more reliable and/or cost-effective materials than previously available; and (3) Developing a greater understanding of and control over geochemical processes during fluid production and transport, energy conversion, and waste management. As a stand-alone program and as support to other DOE geothermal technology development programs, the GEM Program contributes to the feasibility of designing and operating efficient, reliable, and safe fluid handling and energy conversion systems.

  10. U.S. Department of Education FY 2000 Annual Plan, Volume 2: Program Performance Plans.

    ERIC Educational Resources Information Center

    Department of Education, Washington, DC.

    This volume of the Department of Education's (ED) annual plan contains the program-performance plans to support efforts to reach the department's four goals. These four goals are as follows: (1) help all students reach challenging academic standards so that they are prepared for responsible citizenship, further learning, and productive employment;…

  11. Teacher Education Programs in Jordan: A Reform Plan

    ERIC Educational Resources Information Center

    Naba'h, Abdallah Abu; Al-Omari, Hamza; Ihmeideh, Fathi; Al-Wa'ily, Suad

    2009-01-01

    The study presents a historical background of teacher education in Jordan and outlines the components of the present teacher education program at Hashemite University. This includes admission policy, academic study plans, practicum programs, selection of cooperative schools, selection of cooperative teachers, stages of training, and assessment of…

  12. Course Length Versus Course Price: Marketing Factors in Program Planning.

    ERIC Educational Resources Information Center

    Lamoureux, Marvin E.

    Recent program planning literature involving adult education has attempted to draw upon techniques from marketing management. Most of the literature has, however, not explored the relationship between adult education program decision needs and fundamental marketing concepts. Adult educators and marketing managers are conducting similar daily…

  13. Teacher Education Programs in Jordan: A Reform Plan

    ERIC Educational Resources Information Center

    Naba'h, Abdallah Abu; Al-Omari, Hamza; Ihmeideh, Fathi; Al-Wa'ily, Suad

    2009-01-01

    The study presents a historical background of teacher education in Jordan and outlines the components of the present teacher education program at Hashemite University. This includes admission policy, academic study plans, practicum programs, selection of cooperative schools, selection of cooperative teachers, stages of training, and assessment of…

  14. TTIP: Texas Teacher Internship Program 1994 Curriculum Implementation Plans.

    ERIC Educational Resources Information Center

    Walenta, Brian T., Ed.

    The Texas Teacher Internship Program (TTIP) is a competitive program for science, technology and mathematics teachers who serve as summer interns at industry and university sites in order to experience real world applications of the subjects they teach. This document contains curriculum implementation plans developed by the teachers to illustrate…

  15. Course Length Versus Course Price: Marketing Factors in Program Planning.

    ERIC Educational Resources Information Center

    Lamoureux, Marvin E.

    Recent program planning literature involving adult education has attempted to draw upon techniques from marketing management. Most of the literature has, however, not explored the relationship between adult education program decision needs and fundamental marketing concepts. Adult educators and marketing managers are conducting similar daily…

  16. The Living with a Star Program Mission Plan

    NASA Technical Reports Server (NTRS)

    Barth, Janet; Day, John (Technical Monitor)

    2001-01-01

    LWS (Living With a Star) is research science focused to facilitate enabling science for spacecraft design (specifically environment specification models) and spacecraft operations (specifically Space Weather research). The following topics are discussed: LWS goals and program, program architecture, the solar dynamic observer, the geospace plan, the space environment testbed concept, and the heliosphere missions.

  17. The Role of Communications in Population and Family Planning Programs.

    ERIC Educational Resources Information Center

    Sweeney, William O.

    In this paper, the author outlines the historical development of information and education programs for population control and family planning, arguing that communications activities should receive as much emphasis as the health services program. The public information aspect includes use of mass media, advertising and promotion, public relations…

  18. Linear Programming for Vocational Education Planning. Interim Report.

    ERIC Educational Resources Information Center

    Young, Robert C.; And Others

    The purpose of the paper is to define for potential users of vocational education management information systems a quantitative analysis technique and its utilization to facilitate more effective planning of vocational education programs. Defining linear programming (LP) as a management technique used to solve complex resource allocation problems…

  19. Personal and Family Financial Planning: Perspectives on Community College Programs.

    ERIC Educational Resources Information Center

    Leo, Robert J.; And Others

    After a brief summary of the findings of a 1979 study of Personal and Family Financial Planning (PFFP) programs at member institutions of the League for Innovation in the Community College (LICC), this two-part monograph provides information on selected PFFP programs. Part I presents in-depth descriptions of the implementation, subject coverage,…

  20. 7 CFR 225.4 - Program management and administration plan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Section 225.4 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SUMMER FOOD SERVICE PROGRAM State Agency... eligible sponsors; (4) The State's plans for monitoring and inspecting sponsors, feeding sites, and food...

  1. 7 CFR 225.4 - Program management and administration plan.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Section 225.4 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SUMMER FOOD SERVICE PROGRAM State Agency... eligible sponsors; (4) The State's plans for monitoring and inspecting sponsors, feeding sites, and food...

  2. 7 CFR 225.4 - Program management and administration plan.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Section 225.4 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SUMMER FOOD SERVICE PROGRAM State Agency... eligible sponsors; (4) The State's plans for monitoring and inspecting sponsors, feeding sites, and food...

  3. 7 CFR 225.4 - Program management and administration plan.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Section 225.4 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SUMMER FOOD SERVICE PROGRAM State Agency... eligible sponsors; (4) The State's plans for monitoring and inspecting sponsors, feeding sites, and food...

  4. Drunk Driving Public Information Program Strategies and Planning Guide.

    ERIC Educational Resources Information Center

    National Highway Traffic Safety Administration (DOT), Washington, DC.

    This guide, designed to accompany a videocassette of selected television spots is a compendium of specific drunk driving topics and issues for each of the major planning steps of a public information program. The guide is organized around these steps, which are (1) select program strategies, (2) select target audiences, (3) select media channels,…

  5. Planning the Fire Program for the Third Millennium

    Treesearch

    Richard A. Chase

    1987-01-01

    The fire program planner faces an increasingly complex task as diverse--and often contradictory--messages about objectives and constraints are received from political, administrative, budgetary, and social processes. Our principal challenge as we move into the 21st century is not one of looking for flashier technology to include in the planned fire program. Rather, we...

  6. Environmental projects. Volume 12: Friable asbestos abatement, GDSCC

    NASA Technical Reports Server (NTRS)

    1990-01-01

    The Goldstone Deep Space Communications Complex (GDSCC) is part of the NASA Deep Space Network, one of the world's largest and most sensitive scientific telecommunications and radio navigation networks. Activities at the GDSCC are carried out in support of six large parabolic dish antennas. These activities may give rise to a variety of environmental hazards, particularly the danger of exposure of GDSCC personnel to asbestos fibers that have been shown to be responsible for such serious ailments as asbestosis, lung cancer, and mesothelioma. Asbestos-containing materials (ACM's) were used in the construction of many of the approximately 100 buildings and structures that were built at the GDSCC during a 30-year period from the 1950s through 1980s. The friable asbestos-abatement program at the GDSCC is presented which consists of text, illustrations, and tables that describe the friable asbestos abatement carried out at the GDSCC from December 21, 1988 through May 11, 1989.

  7. Oil program implementation plan FY 1996--2000

    SciTech Connect

    1995-04-01

    This document reaffirms the US Department of Energy (DOE) Office of Fossil Energy commitment to implement the National Oil Research Program in a way to maximize assurance of energy security, economic growth, environmental protection, jobs, improved economic competitiveness, and improved US balance of trade. There are two sections and an appendix in this document. Section 1 is background information that guided its formulation and a summary of the Oil Program Implementation Plan. This summary includes mission statements, major program drivers, oil issues and trends, budget issues, customers/stakeholders, technology transfer, measures of program effectiveness, and benefits. Section 2 contains more detailed program descriptions for the eight technical areas and the NIPER infrastructure. The eight technical areas are reservoir characterization; extraction research; exploration, drilling, and risk-based decision management; analysis and planning; technology transfer; field demonstration projects; oil downstream operations; and environmental research. Each description contains an overview of the program, descriptions on main areas, a discussion of stakeholders, impacts, planned budget projections, projected schedules with Gantt charts, and measures of effectiveness. The appendix is a summary of comments from industry on an earlier draft of the plan. Although changes were made in response to the comments, many of the suggestions will be used as guidance for the FY 1997--2001 plan.

  8. Systems engineering implementation plan for the liquid effluents services program

    SciTech Connect

    Lowe, S.S.

    1995-01-01

    A graded approach is being taken by the Liquid Effluents Services Program in implementing systems engineering because of the advanced state of the program. The approach is cost-effective and takes credit for related work already completed, yet retains the benefits of systems engineering. This plan describes how the Liquid Effluents Services Program will implement systems engineering so there is a common understanding. Systems engineering work to be performed and the products of that work are identified. The relation to the current planning process and integration with the sitewide systems engineering effort is described.

  9. Successful business planning for new programs in health care organizations.

    PubMed

    Langland-Orban, B; Krasick, E R

    1991-03-01

    Health care organizations implement business strategies through programs and services, and success depends on careful program design and execution. A conscientious design requires thorough efforts in organizing the planning process, conducting the decision analysis, and obtaining approval for a program. Weak methods and processes in the management of these efforts can result in faulty assumptions and costly errors in the development of new health care ventures, thus preventing the achievement of financial and operating goals. This article reviews the stages of business planning, and the points at which success may be impaired.

  10. Planning an Effective Speakers Outreach Program

    NASA Technical Reports Server (NTRS)

    McDonald, Malcolm W.

    1996-01-01

    The National Aeronautics and Space Administration (NASA) and, in particular, the Marshall Space Flight Center (MSFC) have played pivotal roles in the advancement of space exploration and space-related science and discovery since the early 1960's. Many of the extraordinary accomplishments and advancements of NASA and MSFC have gone largely unheralded to the general public, though they often border on the miraculous. This lack of suitable and deserved announcement of these "miracles" seems to have occurred because NASA engineers and scientists are inclined to regard extraordinary accomplishment as a normal course of events. The goal in this project has been to determine an effective structure and mechanism for communicating to the general public the extent to which our investment in our US civilian space program, NASA, is, in fact, a very wise investment. The project has involved discerning important messages of truth which beg to be conveyed to the public. It also sought to identify MSFC personnel who are particularly effective as messengers or communicators. A third aspect of the project was to identify particular target audiences who would appreciate knowing the facts about their NASA investment. The intent is to incorporate the results into the formation of an effective, proactive MSFC speakers bureau. A corollary accomplishment for the summer was participation in the formation of an educational outreach program known as Nasa Ambassadors. Nasa Ambassadors are chosen from the participants in the various MSFC summer programs including: Summer Faculty Fellowship Program (SFFP), Science Teacher Enrichment Program (STEP), Community College Enrichment Program (CCEP), Joint Venture (JOVE) program, and the NASA Academy program. NASA Ambassadors agree to make pre-packaged NASA-related presentations to non-academic audiences in their home communities. The packaged presentations were created by a small cadre of participants from the 1996 MSFC summer programs, volunteering

  11. [Cost-benefit model of the Rwanda family planning program].

    PubMed

    1991-08-01

    Significant conclusions are presented of the application of a cost-benefit model of family planning in Rwanda. The model and computer programs used were developed by the Research Triangle Institute and financed by the US Agency for International Development. The UN Population Fund participated in the project, which represented the 1st application of the model in Africa. Rwanda's population growth is among the most rapid in the world. The population has increased from about 2 million in 1950 to over 7 million in 1989. The model is composed of 2 parts, the 1st of which discloses the scope of the family planning program and its impact on population growth. The resulting projections are the basis for the 2nd module, the actual cost-benefit analysis which measures the impact of family planning on sectorial expenditures and analyzes the costs and benefits of the program in different sectors. The sectors of health, education, and agriculture are included in this presentation. 2 hypotheses about population growth are included; the 1st assumes the current family planning program and the 2nd assumes no family planning program. The model commences with population and family planning data for 1981. Data through 1989 represent observed rates and those for 1990-2011 are target rates. Only modern family planning methods are included in the model. The prevalence rate for modern methods increased from nearly null in 1981 to 5.3% in 1989 and following current trends is projected at 34.8% in 2000 and 46.8% in 2011. The total fertility rate was 8.6 in 1981 and is projected at 5.5 in 2000 and 4.7 in 2011. The total population is projected at 13.2 million in 2011 with a family planning program or 17.7 million without one. Health expenditures in the final year of the projection would be 41% greater without a family planning program. The family planning program would permit a reduction in the number of children to be educated of over 1 million students, a 54% decrease, assuming that the

  12. 23 CFR 772.13 - Analysis of noise abatement.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Analysis of noise abatement. 772.13 Section 772.13... PROCEDURES FOR ABATEMENT OF HIGHWAY TRAFFIC NOISE AND CONSTRUCTION NOISE § 772.13 Analysis of noise abatement. (a) When traffic noise impacts are identified, noise abatement shall be considered and evaluated for...

  13. 23 CFR 772.13 - Analysis of noise abatement.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Analysis of noise abatement. 772.13 Section 772.13... PROCEDURES FOR ABATEMENT OF HIGHWAY TRAFFIC NOISE AND CONSTRUCTION NOISE § 772.13 Analysis of noise abatement. (a) When traffic noise impacts are identified, noise abatement shall be considered and evaluated for...

  14. 10 CFR 851.22 - Hazard prevention and abatement.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Hazard prevention and abatement. 851.22 Section 851.22... Hazard prevention and abatement. (a) Contractors must establish and implement a hazard prevention and abatement process to ensure that all identified and potential hazards are prevented or abated in a timely...

  15. 10 CFR 851.22 - Hazard prevention and abatement.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Hazard prevention and abatement. 851.22 Section 851.22... Hazard prevention and abatement. (a) Contractors must establish and implement a hazard prevention and abatement process to ensure that all identified and potential hazards are prevented or abated in a timely...

  16. 10 CFR 851.22 - Hazard prevention and abatement.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Hazard prevention and abatement. 851.22 Section 851.22... Hazard prevention and abatement. (a) Contractors must establish and implement a hazard prevention and abatement process to ensure that all identified and potential hazards are prevented or abated in a timely...

  17. 23 CFR 772.13 - Analysis of noise abatement.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... PROCEDURES FOR ABATEMENT OF HIGHWAY TRAFFIC NOISE AND CONSTRUCTION NOISE § 772.13 Analysis of noise abatement. (a) When traffic noise impacts are identified, noise abatement shall be considered and evaluated for... measures for decision-making. (b) In abating traffic noise impacts, a highway agency shall give...

  18. Near coastal program plan for 1991: Estuaries

    SciTech Connect

    Not Available

    1990-11-01

    Environmental regulatory programs in the United States have been estimated to cost more than $70 billion annually. The Environmental Monitoring and Assessment Program (EMAP) is a nationwide initiative being implemented by EPA's Office of Research and Development (ORD). It was developed in response to the demand for information on the condition of the nation's ecological resources. The goal of EMAP is to assess and document the status and trends in the condition of the nation's forests, wetlands, estuaries, coastal waters, lakes, rivers, and streams, Great Lakes, agricultural lands, and arid lands on an integrated and continuing basis.

  19. Program plan for EMP survivability of Navy C2 systems

    SciTech Connect

    Latorre, V.R.; Greenwell, R.A.

    1986-08-01

    This report provides a plan for implementing the Navy Tactical C2 EMP Survivability Program. This program will emphasize the development of EMP standards and specifications for all phases of a C2 system's life from its concept formulation phase through its total in service life. In order to achieve an EMP survivable Navy C2 system, the US Navy must develop a program that will provide appropriate guidance and direction.

  20. Tanks focus area multiyear program plan - FY96-FY98

    SciTech Connect

    1995-07-01

    The Tanks Focus Area (TFA) Multiyear Program Plan (MYPP) presents the recommended TFA technical program. The recommendation covers a 3-year funding outlook (FY96-FY98), with an emphasis on FY96 and FY97. In addition to defining the recommended program, this document also describes the processes used to develop the program, the implementation strategy for the program, the references used to write this report, data on the U.S. Department of Energy (DOE) tank site baselines, details on baseline assumptions and the technical elements, and a glossary.

  1. Strategic Planning to Improve EHDI Programs

    ERIC Educational Resources Information Center

    White, Karl R.; Blaiser, Kristina M.

    2011-01-01

    Because newborn hearing screening has become the standard of care in the United States, every state has established an early hearing detection and intervention (EHDI) program responsible for establishing, maintaining, and improving the system of services needed to serve children with hearing loss and their families. While significant developments…

  2. Data Driven Program Planning for GIS Instruction

    ERIC Educational Resources Information Center

    Scarletto, Edith

    2013-01-01

    This study used both focus groups (qualitative) and survey data (quantitative) to develop and expand an instruction program for GIS services. It examined the needs and preferences faculty and graduate students have for learning about GIS applications for teaching and research. While faculty preferred in person workshops and graduate students…

  3. Strategy Plan Strengthens Energy Conservation Program.

    ERIC Educational Resources Information Center

    Minning, William R.

    1987-01-01

    The United States Department of Energy's Schools and Hospitals Program has been popular among schools. The necessity of locating nonfederal resources to achieve energy management warrants (1) developing a strategy of evaluation among schools and (2) market research and analysis. (CJH)

  4. Strategic Planning to Improve EHDI Programs

    ERIC Educational Resources Information Center

    White, Karl R.; Blaiser, Kristina M.

    2011-01-01

    Because newborn hearing screening has become the standard of care in the United States, every state has established an early hearing detection and intervention (EHDI) program responsible for establishing, maintaining, and improving the system of services needed to serve children with hearing loss and their families. While significant developments…

  5. Operating and Assurance Program Plan. Revision 4

    SciTech Connect

    Not Available

    1994-07-01

    The LBL Operating and Assurance Program (OAP) is a management system and a set of requirements designed to maintain the level of performance necessary to achieve LBL`s programmatic and administrative objectives effectively and safely through the application of quality assurance and related conduct of operations and maintenance management principles. Implement an LBL management philosophy that supports and encourages continual improvement in performance and quality at the Laboratory. Provide an integrated approach to compliance with applicable regulatory requirements and DOE orders. The OAP is intended to meet the requirements of DOE Order 5700.6C, Quality Assurance. The Program also contains management system elements of DOE Orders 5480.19, Conduct of Operations Requirements for DOE Facilities; 5480.25, Safety of Accelerator Facilities; and 4330.4A, Maintenance Management Program, and is meant to integrate these elements into the overall LBL approach to Laboratory management. The requirements of this program apply to LBL employees and organizations, and to contractors and facility users as managed by their LBL sponsors. They are also applicable to external vendors and suppliers as specified in procurement documents and contracts.

  6. Data Driven Program Planning for GIS Instruction

    ERIC Educational Resources Information Center

    Scarletto, Edith

    2013-01-01

    This study used both focus groups (qualitative) and survey data (quantitative) to develop and expand an instruction program for GIS services. It examined the needs and preferences faculty and graduate students have for learning about GIS applications for teaching and research. While faculty preferred in person workshops and graduate students…

  7. Planning Public Relations Programs for Exceptional Events.

    ERIC Educational Resources Information Center

    McElreath, Mark P.

    This paper discusses Program Management (PM), a decision-making process which uses a diachronic, idea-generating communication mode. Decision making according to a PM model entails obtaining a mandate or authorization, identifying the problem, exploring for knowledge and generating solutions, reviewing proposals and developing resources,…

  8. Planning Management Training Programs for Organizational Development

    ERIC Educational Resources Information Center

    Alpander, Guvenc G.

    1974-01-01

    To investigate means of converting management development programs into a successful organizational development process, managers' attitudes toward centralization and decentralization of functions and decisions, the importance of performed functions, their personal effectiveness, their managerial style, and what they prefer for executive…

  9. The Rural Elderly: Program Planning Guidelines.

    ERIC Educational Resources Information Center

    Coward, Raymond T.; Kerckhoff, Richard K.

    Designed for the rural practitioner, this manual offers a description of the major developmental tasks faced by individuals during the latter part of the life span and a summary of the major implications that research holds for building community programs for the rural elderly. Section II discusses two major assumptions: (1) because human beings…

  10. LSS systems planning and performance program

    NASA Technical Reports Server (NTRS)

    Mckenna, Victoria Jones; Dendy, Michael J.; Naumann, Charles B.; Rice, Sally A.; Weathers, John M.

    1993-01-01

    This report describes, using viewgraphs, the Marshall Space Flight Center's Large Space Structures Ground Test Facilities located in building 4619. Major topics include the Active Control Evaluation of Systems (ACES) Laboratory; the Control-Structures Interaction/Controls, Astrophysics, and Structures Experiment in Space (CSI/CASES); Advanced Development Facility; and the ACES Guest Investigator Program.

  11. Planning and Research for Program Expansion.

    ERIC Educational Resources Information Center

    Greenblatt, Sadelle T.

    Little Brothers--Friends of the Elderly is a non-profit, non-sectarian federation of agencies devoted to meeting the needs of the elderly poor, those poor not merely in worldly goods, but in love. The organization examined how it might more effectively spread its services and assure the establishment throughout the United States of programs with…

  12. The NASA computer science research program plan

    NASA Technical Reports Server (NTRS)

    1983-01-01

    A taxonomy of computer science is included, one state of the art of each of the major computer science categories is summarized. A functional breakdown of NASA programs under Aeronautics R and D, space R and T, and institutional support is also included. These areas were assessed against the computer science categories. Concurrent processing, highly reliable computing, and information management are identified.

  13. Draft SEI Program Plans: 1994-1998

    DTIC Science & Technology

    1993-08-01

    analyzed within a specific area of knowledge and experience. The SEI has developed a feature-oriented domain analysis ( FODA ) method that develops a...Computer Resources Support Improvement Program FAA Federal Aviation Administration FFRDC federally funded research and development center FODA feature

  14. Environmental Restoration Program Roadmap: Strategic program plan. Addendum 1

    SciTech Connect

    1992-12-11

    This Addendum to the Portsmouth (PORTS) Environmental Restoration (ER) Roadmap expands on the FY 1992 strategic plan for PORTS by providing human resource loading, ADS linkages to resolution activities, and technology development information. Each of these topics is presented in a separate section.

  15. Subseabed Disposal Program Plan. Volume I. Overview

    SciTech Connect

    1981-07-01

    The primary objective of the Subseabed Disposal Program (SDP) is to assess the scientific, environmental, and engineering feasibility of disposing of processed and packaged high-level nuclear waste in geologic formations beneath the world's oceans. High-level waste (HLW) is considered the most difficult of radioactive wastes to dispose of in oceanic geologic formations because of its heat and radiation output. From a scientific standpoint, the understanding developed for the disposal of such HLW can be used for other nuclear wastes (e.g., transuranic - TRU - or low-level) and materials from decommissioned facilities, since any set of barriers competent to contain the heat and radiation outputs of high-level waste will also contain such outputs from low-level waste. If subseabed disposal is found to be feasible for HLW, then other factors such as cost will become more important in considering subseabed emplacement for other nuclear wastes. A secondary objective of the SDP is to develop and maintain a capability to assess and cooperate with the seabed nuclear waste disposal programs of other nations. There are, of course, a number of nations with nuclear programs, and not all of these nations have convenient access to land-based repositories for nuclear waste. Many are attempting to develop legislative and scientific programs that will avoid potential hazards to man, threats to other ocean uses, and marine pollution, and they work together to such purpose in meetings of the international NEA/Seabed Working Group. The US SDP, as the first and most highly developed R and D program in the area, strongly influences the development of subseabed-disposal-related policy in such nations.

  16. 29 CFR 1903.19 - Abatement verification.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... date identified in the final order for abatement; or (B) The date computed by adding the period allowed... (for example, for employers who have mobile work operations), the employer must: (i) Post each...

  17. 29 CFR 1903.19 - Abatement verification.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... date identified in the final order for abatement; or (B) The date computed by adding the period allowed... (for example, for employers who have mobile work operations), the employer must: (i) Post each...

  18. 29 CFR 1903.19 - Abatement verification.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... date identified in the final order for abatement; or (B) The date computed by adding the period allowed... (for example, for employers who have mobile work operations), the employer must: (i) Post each...

  19. 29 CFR 1903.19 - Abatement verification.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... date identified in the final order for abatement; or (B) The date computed by adding the period allowed... (for example, for employers who have mobile work operations), the employer must: (i) Post each...

  20. Planning a Financial Aid Awareness Program.

    ERIC Educational Resources Information Center

    Department of Education, Washington, DC.

    This booklet is intended to be used with a set of slides as part of a presentation to students on "How To Apply for Federal Student Aid." The first part of the book is a script based on the slides. The images displayed on each slide are also provided in the booklet. After the script is a guide to hosting a financial aid information program. The…

  1. Tank farm waste characterization Technology Program Plan

    SciTech Connect

    Hohl, T.M.; Schull, K.E.; Bensky, M.S.; Sasaki, L.M.

    1989-03-01

    This document presents technological and analytical methods development activities required to characterize, process, and dispose of Hanford Site wastes stored in underground waste tanks in accordance with state and federal environmental regulations. The document also lists the need date, current (fiscal year 1989) funding, and estimate of future funding for each task. Also identified are the impact(s) if an activity is not completed. The document integrates these needs to minimize duplication of effort between the various programs involved.

  2. Constance mirror program: Progress and plans

    NASA Technical Reports Server (NTRS)

    Klinkowstein, R. E.; Mauel, M. E.; Irby, J. H.; Smullin, L. D.; Voldman, S. H.

    1981-01-01

    The current state of the mechanics of the Constance II experiment, the physics results gathered, the motivation background, and future plans for the Constance II experiment are reviewed. Several improvements have been made and several experimental investigations have been completed. These include the construction/installation/testing of: (1) liquid-nitrogen cooled, Ioffe bars installed, (2) a diverter coil (3) the 100 kW ICRF generator, (4) the data acquisition system, and (5) the optimum hot-iron operation of the machine with Titanium and pulsed-gas plasma guns. Measurements were made of the density, temperature, and radius of the plasma. Ion-cyclotron fluctuations were observed, their bandwidth measured, and data collected demonstrating resonance heating. New X-ray diagnostics were designed and purchased, and progress on the Thomson scattering was made. Finally, a new hot cathode gun was designed and constructed.

  3. Active microwave users working group program planning

    NASA Technical Reports Server (NTRS)

    Ulaby, F. T.; Bare, J.; Brown, W. E., Jr.; Childs, L. F.; Dellwig, L. F.; Heighway, J. E.; Joosten, R.; Lewis, A. J.; Linlor, W.; Lundien, J. R.

    1978-01-01

    A detailed programmatic and technical development plan for active microwave technology was examined in each of four user activities: (1) vegetation; (2) water resources and geologic applications, and (4) oceanographic applications. Major application areas were identified, and the impact of each application area in terms of social and economic gains were evaluated. The present state of knowledge of the applicability of active microwave remote sensing to each application area was summarized and its role relative to other remote sensing devices was examined. The analysis and data acquisition techniques needed to resolve the effects of interference factors were reviewed to establish an operational capability in each application area. Flow charts of accomplished and required activities in each application area that lead to operational capability were structured.

  4. Site action plan for maintenance management program. Revision D

    SciTech Connect

    Pearson, A.W.

    1993-11-30

    (DOE) Order 4330.4B, ``Maintenance Management Program`` requires each site to develop a Site Action Plan for implementing a Maintenance Management Program. Nonnuclear facilities are required to address the 32 elements of Chapter 1: Guidelines for the Conduct of Maintenance at DOE Nonnuclear Facilities. This document details the degree of implementation for each element, and the Martin Marietta Specialty Components, Inc., plan for implementation of the items which remain to be completed. The original Pinellas Plant Maintenance Management Program Site Action Plan (Issue A) was completed March 27, 1991. The format was modified per DOE request and it was resubmitted as Issue B and approved by AL September 16, 1991. Issue C was submitted, and approved December 20, 1992. The most significant achievement during FY-93 were the implementation of plant wide Graded Approach, and Configuration Control programs. The methodologies for performing these activities were developed, and pilot programs were implemented to verify their effectiveness. Plant wide implementation of both programs is progressing on a high priority basis. The formalized method for grading equipment and facilities provides a basis for establishing uniform, risk based priorities. The risks involved are environment, safety, health and programmatic mission. Other achievements for FY-93, include the establishment of procedures for the decommissioning, and down-grading of facilities, improved work control, improved work performance reporting, improved quality plans, and improved operating procedures.

  5. Program plan, and request for reprogramming first year funds

    SciTech Connect

    Not Available

    1993-02-10

    In June of 1992, the U. S. Department of Energy (DOE) awarded assistance Medical University of South Carolina (MUSC) for the Environmental Hazards Assessment Program, The first year of the program is primarily a planning year. We have aggressively pursued input into the EHAP program to begin to understand where our efforts fit within other efforts underway nationally. We have also begun some direct activities at MUSC to begin the program. Part of this report is devoted to informing DOE of what we have accomplished so far this year. In our efforts to plan, we have identified several changes in emphasis for the program. These changes affect the original plan in terms of projected milestones and budget allocations. Part of this report describes these changes and describes the proposed changes to the budget. We are not requesting additional funds for this year. Simply, we are requesting some change in allocations to budget categories. Therefore, our report to DOE is a combination status report, program plan, and request for reallocation of budget.

  6. Hanford Site waste minimization and pollution prevention awareness program plan

    SciTech Connect

    Place, B.G.

    1998-09-24

    This plan, which is required by US Department of Energy (DOE) Order 5400. 1, provides waste minimization and pollution prevention guidance for all Hanford Site contractors. The plan is primary in a hierarchical series that includes the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan, Prime contractor implementation plans, and the Hanford Site Guide for Preparing and Maintaining Generator Group Pollution Prevention Program Documentation (DOE-RL, 1997a) describing programs required by Resource Conservation and Recovery Act of 1976 (RCRA) 3002(b) and 3005(h) (RCRA and EPA, 1994). Items discussed include the pollution prevention policy and regulatory background, organizational structure, the major objectives and goals of Hanford Site`s pollution prevention program, and an itemized description of the Hanford Site pollution prevention program. The document also includes US Department of Energy, Richland Operations Office`s (RL`s) statement of policy on pollution prevention as well as a listing of regulatory drivers that require a pollution prevention program.

  7. Integrated High Payoff Rocket Propulsion Technologies Program Material Development Plan

    NASA Technical Reports Server (NTRS)

    Clinton, R. G., Jr.; Stropki, M.; Cleyrat, D.; Stucke, B.; Phillips, S.; Reed, B.

    2001-01-01

    In this viewgraph presentation, IMWG (IHPRPT Materials Working Group) government and industry members, together with the IHPRPT (Integrated High Payoff Rocket Propulsion Technologies Program Material Development Plan) National Component Leads, have developed a materials plan to address the critical needs of the IHPRPT community: (1) liquids boost and orbit transfer; (2) solids boost and orbit transfer; (3) tactical propulsion; and (4) spacecraft propulsion. Criticality of materials' role in achieving IHPRPT goals is evidenced by the significant investment over the next five years.

  8. Estimating the National Carbon Abatement Potential of City Policies: A Data- Driven Approach

    SciTech Connect

    O'Shaughnessy, Eric; Heeter, Jenny; Keyser, David; Gagnon, Pieter; Aznar, Alexandra

    2016-10-01

    Cities are increasingly taking actions such as building code enforcement, urban planning, and public transit expansion to reduce emissions of carbon dioxide in their communities and municipal operations. However, many cities lack the quantitative information needed to estimate policy impacts and prioritize city actions in terms of carbon abatement potential and cost effectiveness. This report fills this research gap by providing methodologies to assess the carbon abatement potential of a variety of city actions. The methodologies are applied to an energy use data set of 23,458 cities compiled for the U.S. Department of Energy’s City Energy Profile tool. The analysis estimates the national carbon abatement potential of the most commonly implemented actions in six specific policy areas. The results of this analysis suggest that, in aggregate, cities could reduce nationwide carbon emissions by about 210 million metric tons of carbon dioxide (MMT CO2) per year in a "moderate abatement scenario" by 2035 and 480 MMT CO2/year in a "high abatement scenario" by 2035 through these common actions typically within a city’s control in the six policy areas. The aggregate carbon abatement potential of these specific areas equates to a reduction of 3%-7% relative to 2013 U.S. emissions. At the city level, the results suggest the average city could reduce carbon emissions by 7% (moderate) to 19% (high) relative to current city-level emissions. City carbon abatement potential is sensitive to national and state policies that affect the carbon intensity of electricity and transportation. Specifically, the U.S. Clean Power Plan and further renewable energy cost reductions could reduce city carbon emissions overall, helping cities achieve their carbon reduction goals.

  9. United State space programs - Present and planned

    NASA Technical Reports Server (NTRS)

    Frosch, R. A.

    1978-01-01

    The U.S. space program is considered with reference to the benefits derived by the public. Missions are divided into three categories: the use of near-earth space for remote sensing, communications, and other purposes directly beneficial to human welfare; the scientific exploration of the solar system and observation of the universe as part of the continuing effort to understand the place of earth and man in the cosmos; and the investigation of the sun-earth relationships which are basic to the terrestrial biosphere. Individual projects are described, and it is suggested that the future of space technology in 1978 is comparable to the future of aviation in 1924.

  10. United State space programs - Present and planned

    NASA Technical Reports Server (NTRS)

    Frosch, R. A.

    1978-01-01

    The U.S. space program is considered with reference to the benefits derived by the public. Missions are divided into three categories: the use of near-earth space for remote sensing, communications, and other purposes directly beneficial to human welfare; the scientific exploration of the solar system and observation of the universe as part of the continuing effort to understand the place of earth and man in the cosmos; and the investigation of the sun-earth relationships which are basic to the terrestrial biosphere. Individual projects are described, and it is suggested that the future of space technology in 1978 is comparable to the future of aviation in 1924.

  11. WASTE CERTIFICATION PROGRAM PLAN - REVISION 7

    SciTech Connect

    MORGAN, LK

    2002-01-08

    The primary changes that have been made to this revision reflect the relocation of the Waste Certification Official (WCO) organizationally from the Quality Services Division (QSD) into the Laboratory Waste Services (LWS) Organization. Additionally, the responsibilities for program oversight have been differentiated between the QSD and LWS. The intent of this effort is to ensure that those oversight functions, which properly belonged to the WCO, moved with that function; but retain an independent oversight function outside of the LWS Organization ensuring the potential for introduction of organizational bias, regarding programmatic and technical issues, is minimized. The Waste Certification Program (WCP) itself has been modified to allow the waste certification function to be performed by any of the personnel within the LWS Waste Acceptance/Certification functional area. However, a single individual may not perform both the technical waste acceptance review and the final certification review on the same 2109 data package. Those reviews must be performed by separate individuals in a peer review process. There will continue to be a designated WCO who will have lead programmatic responsibility for the WCP and will exercise overall program operational oversite as well as determine the overall requirements of the certification program. The quality assurance organization will perform independent, outside oversight to ensure that any organizational bias does not degrade the integrity of the waste certification process. The core elements of the previous WCP have been retained, however, the terms and process structure have been modified.. There are now two ''control points,'' (1) the data package enters the waste certification process with the signature of the Generator Interface/Generator Interface Equivalent (GI/GIE), (2) the package is ''certified'', thus exiting the process. The WCP contains three steps, (1) the technical review for waste acceptance, (2) a review of the

  12. Experimental program plan for the Waste Isolation Pilot Plant

    SciTech Connect

    Not Available

    1994-01-01

    The US Department of Energy has prepared this Experimental Program Plan for the Waste Isolation Pilot Plant (EPP) to provide a summary of the DOE experimental efforts needed for the performance assessment process for the WIPP, and of the linkages of this process to the appropriate regulations. The Plan encompasses a program of analyses of the performance of the planned repository based on scientific studies, including tests with transuranic waste at laboratory sites, directed at evaluating compliance with the principal regulations governing the WIPP. The Plan begins with background information on the WIPP project, the requirements of the LWA (Land Withdrawal Act), and its objective and scope. It then presents an overview of the regulatory requirements and the compliance approach. Next are comprehensive discussions of plans for compliance with disposal regulations, followed by the SWDA (Solid Waste Disposal Act) and descriptions of activity programs designed to provide information needed for determining compliance. Descriptions and justifications of all currently planned studies designed to support regulatory compliance activities are also included.

  13. Strategic plan for the geothermal energy program

    SciTech Connect

    1998-06-01

    Geothermal energy (natural heat in the Earth`s crust) represents a truly enormous amount of energy. The heat content of domestic geothermal resources is estimated to be 70,000,000 quads, equivalent to a 750,000-year supply of energy for the entire Nation at current rates of consumption. World geothermal resources (exclusive of resources under the oceans) may be as much as 20 times larger than those of the US. While industry has focused on hydrothermal resources (those containing hot water and/or steam), the long-term future of geothermal energy lies in developing technology to enable use of the full range of geothermal resources. In the foreseeable future, heat may be extracted directly from very hot rocks or from molten rocks, if suitable technology can be developed. The US Department of Energy`s Office of Geothermal Technologies (OGT) endorses a vision of the future in which geothermal energy will be the preferred alternative to polluting energy sources. The mission of the Program is to work in partnership with US industry to establish geothermal energy as a sustainable, environmentally sound, economically competitive contributor to the US and world energy supply. In executing its mission and achieving its long-term vision for geothermal energy, the Program has identified five strategic goals: electric power generation; direct use applications and geothermal heat pumps; international geothermal development; science and technology; and future geothermal resources. This report discusses the objectives of these five goals.

  14. Integrating human resources and program-planning strategies.

    PubMed

    Smith, J E

    1989-06-01

    The integration of human resources management (HRM) strategies with long-term program-planning strategies in hospital pharmacy departments is described. HRM is a behaviorally based, comprehensive strategy for the effective management and use of people that seeks to achieve coordination and integration with overall planning strategies and other managerial functions. It encompasses forecasting of staffing requirements; determining work-related factors that are strong "motivators" and thus contribute to employee productivity and job satisfaction; conducting a departmental personnel and skills inventory; employee career planning and development, including training and education programs; strategies for promotion and succession, including routes of advancement that provide alternatives to the managerial route; and recruitment and selection of new personnel to meet changing departmental needs. Increased competitiveness among hospitals and a shortage of pharmacists make it imperative that hospital pharmacy managers create strategies to attract, develop, and retain the right individuals to enable the department--and the hospital as a whole--to grow and change in response to the changing health-care environment in the United States. Pharmacy managers would be greatly aided in this mission by the establishment of a well-defined, national strategic plan for pharmacy programs and services that includes an analysis of what education and training are necessary for their successful accomplishment. Creation of links between overall program objectives and people-planning strategies will aid hospital pharmacy departments in maximizing the long-term effectiveness of their practice.

  15. Program Plan for 2005: NASA Scientific and Technical Information Program

    NASA Technical Reports Server (NTRS)

    2005-01-01

    Throughout 2005 and beyond, NASA will be faced with great challenges and even greater opportunities. Following a period of reevaluation, reinvention, and transformation, we will move rapidly forward to leverage new partnerships, approaches, and technologies that will enhance the way we do business. NASA's Scientific and Technical Information (STI) Program, which functions under the auspices of the Agency's Chief Information Officer (CIO), is an integral part of NASA's future. The program supports the Agency's missions to communicate scientific knowledge and understanding and to help transfer NASA's research and development (R&D) information to the aerospace and academic communities and to the public. The STI Program helps ensure that the Agency will remain at the leading edge of R&D by quickly and efficiently capturing and sharing NASA and worldwide STI to use for problem solving, awareness, and knowledge management and transfer.

  16. Nuclear Explosion Monitoring Research and Engineering Program - Strategic Plan

    SciTech Connect

    Casey, Leslie A.

    2004-09-01

    The Department of Energy (DOE)/National Nuclear Security Administration (NNSA) Nuclear Explosion Monitoring Research and Engineering (NEM R&E) Program is dedicated to providing knowledge, technical expertise, and products to US agencies responsible for monitoring nuclear explosions in all environments and is successful in turning scientific breakthroughs into tools for use by operational monitoring agencies. To effectively address the rapidly evolving state of affairs, the NNSA NEM R&E program is structured around three program elements described within this strategic plan: Integration of New Monitoring Assets, Advanced Event Characterization, and Next-Generation Monitoring Systems. How the Program fits into the National effort and historical accomplishments are also addressed.

  17. Standard Review Plan Maintenance Program implementing procedures document

    SciTech Connect

    1996-11-01

    The implementing Procedures Document (IPD) was developed by the Inspection Program Projects Branch, Office of Nuclear Reactor Regulation, with assistance from Pacific Northwest National Laboratory, for the Standard Review Plan Maintenance Program (SRP-MP). The SRP-MP was established to maintain the Standard Review Plan (SRP) on an on-going basis. The IPD provides guidance, including an overall approach and procedures, for SRP-MP tasks. The objective of the IPD is to ensure that modifications to SRP need to reflect current NRC requirements and guidance are identified and that a consistent methodology is used to develop and revise SRP sections.

  18. Career Development in Industry. A Study of Selected Programs and Recommendations for Program Planning.

    ERIC Educational Resources Information Center

    Cohen, Barbara S.

    A study was conducted to see what specific programs have been developed for employee career planning and development in order to help organizations interested in establishing career development programs learn what other organizations are doing, what types of programs are in effect and how they are managed. The study was based upon information…

  19. Human Research Program Integrated Research Plan. Revision A January 2009

    NASA Technical Reports Server (NTRS)

    2009-01-01

    The Integrated Research Plan (IRP) describes the portfolio of Human Research Program (HRP) research and technology tasks. The IRP is the HRP strategic and tactical plan for research necessary to meet HRP requirements. The need to produce an IRP is established in HRP-47052, Human Research Program - Program Plan, and is under configuration management control of the Human Research Program Control Board (HRPCB). Crew health and performance is critical to successful human exploration beyond low Earth orbit. The Human Research Program (HRP) is essential to enabling extended periods of space exploration because it provides knowledge and tools to mitigate risks to human health and performance. Risks include physiological and behavioral effects from radiation and hypogravity environments, as well as unique challenges in medical support, human factors, and behavioral or psychological factors. The Human Research Program (HRP) delivers human health and performance countermeasures, knowledge, technologies and tools to enable safe, reliable, and productive human space exploration. Without HRP results, NASA will face unknown and unacceptable risks for mission success and post-mission crew health. This Integrated Research Plan (IRP) describes HRP s approach and research activities that are intended to address the needs of human space exploration and serve HRP customers and how they are integrated to provide a risk mitigation tool. The scope of the IRP is limited to the activities that can be conducted with the resources available to the HRP; it does not contain activities that would be performed if additional resources were available. The timescale of human space exploration is envisioned to take many decades. The IRP illustrates the program s research plan through the timescale of early lunar missions of extended duration.

  20. Strategic plan for the restructured US fusion energy sciences program

    SciTech Connect

    1996-08-01

    This plan reflects a transition to a restructured fusion program, with a change in focus from an energy technology development program to a fusion energy sciences program. Since the energy crisis of the early 1970`s, the U.S. fusion program has presented itself as a goal- oriented fusion energy development program, with milestones that required rapidly increasing budgets. The Energy Policy Act of 1992 also called for a goal-oriented development program consistent with the Department`s planning. Actual funding levels, however, have forced a premature narrowing of the program to the tokamak approach. By 1995, with no clear, immediate need driving the schedule for developing fusion energy and with enormous pressure to reduce discretionary spending, Congress cut fusion program funding for FY 1996 by one-third and called for a major restructuring of the program. Based on the recommendations of the Fusion Energy Advisory Committee (FEAC), the Department has decided to pursue a program that concentrates on world-class plasma, science, and on maintaining an involvement in fusion energy science through international collaboration. At the same time, the Japanese and Europeans, with energy situations different from ours, are continuing with their goal- oriented fusion programs. Collaboration with them provides a highly leveraged means of continued involvement in fusion energy science and technology, especially through participation in the engineering and design activities of the International Thermonuclear Experimental Reactor program, ITER. This restructured fusion energy sciences program, with its focus on fundamental fusion science and technology, may well provide insights that lead to more attractive fusion power plants, and will make use of the scientific infrastructure that will allow the United States to launch a fusion energy development program at some future date.

  1. Coal Power Systems strategic multi-year program plans

    SciTech Connect

    2001-02-01

    The Department of Energy's (DOE) Office of Fossil Energy (FE), through the Coal and Power Systems (C and PS) program, funds research to advance the scientific knowledge needed to provide new and improved energy technologies; to eliminate any detrimental environmental effects of energy production and use; and to maintain US leadership in promoting the effective use of US power technologies on an international scale. Further, the C and PS program facilitates the effective deployment of these technologies to maximize their benefits to the Nation. The following Strategic Plan describes how the C and PS program intends to meet the challenges of the National Energy Strategy to: (1) enhance American's energy security; (2) improve the environmental acceptability of energy production and use; (3) increase the competitiveness and reliability of US energy systems; and (4) ensure a robust US energy future. It is a plan based on the consensus of experts and managers from FE's program offices and the National Energy Technology Laboratory (NETL).

  2. SDI (Strategic Defense Initiative) software technology program plan. Final report

    SciTech Connect

    Linn, C.J.; Redwine, S.T.; Bloom, M.I.; Brykczynski, B.; Chludzinski, J.

    1987-06-01

    This paper was prepared in response to a request from the Battle Management C3 office within the Strategic Defense Initiative Organization (SDIO) of the Department of Defense (DoD). The request was for a software-technology program plan to define software research and development (RandD) efforts required by the SDI, and to provide the basis for integrating the SDIO software technology program with ongoing non-SDIO programs. The paper emphasizes reviewing the ongoing software programs and plans within the DoD and academia. The reviews identify critical software technology areas required to meet the unique SDI requirements, and indicate priorities among the software technologies to meet attainability, productivity, and reliability goals, as well as functional performance objectives.

  3. MIP- MULTIMISSION INTERACTIVE PICTURE PLANNING PROGRAM

    NASA Technical Reports Server (NTRS)

    Callahan, J. D.

    1994-01-01

    The Multimission Interactive Picture Planner, MIP, is a scientifically accurate and fast, 3D animation program for deep space. MIP is also versatile, reasonably comprehensive, portable, and will run on microcomputers. New techniques were developed to rapidly perform the calculations and transformations necessary to animate scientifically accurate 3D space. At the same time, portability is maintained, as the transformations and clipping have been written in FORTRAN 77 code. MIP was primarily designed to handle Voyager, Galileo, and the Space Telescope. It can, however, be adapted to handle other missions. The space simulation consists of a rotating body (usually a planet), any natural satellites, a spacecraft, the sun, stars, descriptive labelling, and field of view boxes. The central body and natural satellites are tri-axial wireframe representations with terminators, limbs, and landmarks. Hidden lines are removed for the central body and natural satellites, but not for the scene as a whole so that bodies may be seen behind one another. The program has considerable flexibility in its step time, observer position, viewed object, field of view, etc. Most parameters may be changed from the keyboard while the simulation is running. When MIP is executed it will ask the user for a control file, which should be prepared before execution. The control file identifies which mission MIP should simulate, the star catalog files, the ephemerides files to be used, the central body, planets, asteroids, and comets, and solar system landmarks and constants such as planets, asteroids, and comets. The control file also describes the fields of view. Control files are included to simulate the Voyager 1 encounter at Jupiter and the Giotto spacecraft's flyby of Halley's comet. Data is included for Voyager 1 and 2 (all 6 planetary encounters) and Giotto. MIP was written for an IBM PC or compatibles. It requires 512K of RAM, a CGA or compatible graphics adapter, and DOS 2.0 or higher. Users

  4. MIP- MULTIMISSION INTERACTIVE PICTURE PLANNING PROGRAM

    NASA Technical Reports Server (NTRS)

    Callahan, J. D.

    1994-01-01

    The Multimission Interactive Picture Planner, MIP, is a scientifically accurate and fast, 3D animation program for deep space. MIP is also versatile, reasonably comprehensive, portable, and will run on microcomputers. New techniques were developed to rapidly perform the calculations and transformations necessary to animate scientifically accurate 3D space. At the same time, portability is maintained, as the transformations and clipping have been written in FORTRAN 77 code. MIP was primarily designed to handle Voyager, Galileo, and the Space Telescope. It can, however, be adapted to handle other missions. The space simulation consists of a rotating body (usually a planet), any natural satellites, a spacecraft, the sun, stars, descriptive labelling, and field of view boxes. The central body and natural satellites are tri-axial wireframe representations with terminators, limbs, and landmarks. Hidden lines are removed for the central body and natural satellites, but not for the scene as a whole so that bodies may be seen behind one another. The program has considerable flexibility in its step time, observer position, viewed object, field of view, etc. Most parameters may be changed from the keyboard while the simulation is running. When MIP is executed it will ask the user for a control file, which should be prepared before execution. The control file identifies which mission MIP should simulate, the star catalog files, the ephemerides files to be used, the central body, planets, asteroids, and comets, and solar system landmarks and constants such as planets, asteroids, and comets. The control file also describes the fields of view. Control files are included to simulate the Voyager 1 encounter at Jupiter and the Giotto spacecraft's flyby of Halley's comet. Data is included for Voyager 1 and 2 (all 6 planetary encounters) and Giotto. MIP was written for an IBM PC or compatibles. It requires 512K of RAM, a CGA or compatible graphics adapter, and DOS 2.0 or higher. Users

  5. General test plan redundant sensor strapdown IMU evaluation program

    NASA Technical Reports Server (NTRS)

    Hartwell, T.; Irwin, H. A.; Miyatake, Y.; Wedekind, D. E.

    1971-01-01

    The general test plan for a redundant sensor strapdown inertial measuring unit evaluation program is presented. The inertial unit contains six gyros and three orthogonal accelerometers. The software incorporates failure detection and correction logic and a land vehicle navigation program. The principal objective of the test is a demonstration of the practicability, reliability, and performance of the inertial measuring unit with failure detection and correction in operational environments.

  6. Configuration management program plan for Hanford site systems engineering

    SciTech Connect

    Hoffman, A.G.

    1994-11-14

    This plan establishes the integrated configuration management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford site technical baseline.

  7. The NASA Cryogenic Fluid Management Technology Program Plan

    NASA Technical Reports Server (NTRS)

    Faddoul, James R.; Mcintyre, Stanley D.

    1991-01-01

    The status of the NASA Cryogenic Fluid Management Technology Program Plan is discussed along with specific needs for near future missions. Using the Space Exploration Initiative mission set, cost/benefit projections are then made for development of advanced cryogenic fluid management techniques. Space based and earth based test programs are discussed relative to the technology requirements for liquid storage, supply and transfer and for fluid transfer and advanced instrumentation.

  8. Hydrologic data-verification management program plan

    USGS Publications Warehouse

    Alexander, C.W.

    1982-01-01

    Data verification refers to the performance of quality control on hydrologic data that have been retrieved from the field and are being prepared for dissemination to water-data users. Water-data users now have access to computerized data files containing unpublished, unverified hydrologic data. Therefore, it is necessary to develop techniques and systems whereby the computer can perform some data-verification functions before the data are stored in user-accessible files. Computerized data-verification routines can be developed for this purpose. A single, unified concept describing master data-verification program using multiple special-purpose subroutines, and a screen file containing verification criteria, can probably be adapted to any type and size of computer-processing system. Some traditional manual-verification procedures can be adapted for computerized verification, but new procedures can also be developed that would take advantage of the powerful statistical tools and data-handling procedures available to the computer. Prototype data-verification systems should be developed for all three data-processing environments as soon as possible. The WATSTORE system probably affords the greatest opportunity for long-range research and testing of new verification subroutines. (USGS)

  9. 25 CFR 170.700 - What is the IRR Program stewardship plan?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What is the IRR Program stewardship plan? 170.700 Section... ROADS PROGRAM Program Oversight and Accountability § 170.700 What is the IRR Program stewardship plan? The IRR Program stewardship plan delineates the respective roles and responsibilities of BIA and...

  10. 25 CFR 170.700 - What is the IRR Program stewardship plan?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false What is the IRR Program stewardship plan? 170.700 Section... ROADS PROGRAM Program Oversight and Accountability § 170.700 What is the IRR Program stewardship plan? The IRR Program stewardship plan delineates the respective roles and responsibilities of BIA and...

  11. Financial services FY 1996 site support program plan, WBS 6.10.4. Revision 1

    SciTech Connect

    Schafer, D.D.

    1995-09-01

    This program plan outlines the financial services to be provided to the Hanford reservation by the Westinghouse Hanford Company. The topics of the plan include the Hanford strategic plan, program mission, program strategy, technical requirements baseline, schedule baseline, cost baseline, performance measures, technical objectives, program performance and program funding required.

  12. A Seven-Step Business Plan Methodology To Develop and Manage Certificate Programs.

    ERIC Educational Resources Information Center

    Cherif, Karim

    2000-01-01

    Outlines a process for writing a business plan for university certificate programs. The plan's sections include executive summary, rationale and objectives, prospective student profile, external involvement, program characteristics, marketing and promotion, and program administration. (SK)

  13. Sequential decision plans, benthic macroinvertebrates, and biological monitoring programs

    NASA Astrophysics Data System (ADS)

    Jackson, John K.; Resh, Vincent H.

    1989-07-01

    A common obstacle to the inclusion of benthic macroinvertebrates in water quality monitoring programs is that numerous sample units must be examined in order to distinguish between impacted and unimpacted conditions, which can add significantly to the total cost of a monitoring program. Sequential decision plans can be used to reduce this cost because the number of sample units needed to classify a site as impacted or unimpacted is reduced by an average of 50%. A plan is created using definitions of unimpacted and impacted conditions, a description of the mathematical distribution of the data, and definitions of acceptable risks of type I and II errors. The applicability of using sequential decision plans and benthic macroinvertebrates in water quality monitoring programs is illustrated with several examples (e.g., identifying moderate and extreme changes in species richness in response to acid mine drainage; assessing the impact of a crude oil contamination on the density of two benthic populations; monitoring the effect of geothermal effluents on species diversity). These examples use data conforming to the negative binomial, Poisson, and normal distributions and define impact as changes in population density, species richness, or species diversity based on empirical data or the economic feasibility of the sequential decision plan. All mathematical formulae and intermediate values are provided for the step-by-step calculation of each sequential decision plan.

  14. 1992 Resource Program, 10 Year Plan : Draft II.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-05-01

    The Resource Program is the Bonneville Power Administration's primary process for deciding how to meet future electricity resource needs, how much new resources to develop, which types of resources to acquire or option and how to go about acquiring them, and how much BPA will have to spend for these resources. Recognizing that BPA must make a long-term commitment to acquiring conservation effectively, the 1992 Resource Program outlines a 10-year plan. Draft 2 of the 1992 Resource Program provides a framework for discussing the funding levels proposed in the Programs in Perspective (PIP) process. Previous final resource programs have been released prior to the PIP process. This version of the Resource Program recognizes that the PIP discussions are an integral part of the resource decision-making process and, therefore, it will be finalized after PIP.

  15. 1992 Resource Program, 10 Year Plan : Draft II.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-05-01

    The Resource Program is the Bonneville Power Administration`s primary process for deciding how to meet future electricity resource needs, how much new resources to develop, which types of resources to acquire or option and how to go about acquiring them, and how much BPA will have to spend for these resources. Recognizing that BPA must make a long-term commitment to acquiring conservation effectively, the 1992 Resource Program outlines a 10-year plan. Draft 2 of the 1992 Resource Program provides a framework for discussing the funding levels proposed in the Programs in Perspective (PIP) process. Previous final resource programs have been released prior to the PIP process. This version of the Resource Program recognizes that the PIP discussions are an integral part of the resource decision-making process and, therefore, it will be finalized after PIP.

  16. Measuring infrastructure: A key step in program evaluation and planning

    PubMed Central

    Schmitt, Carol L.; Glasgow, LaShawn; Lavinghouze, S. Rene; Rieker, Patricia P.; Fulmer, Erika; McAleer, Kelly; Rogers, Todd

    2016-01-01

    State tobacco prevention and control programs (TCPs) require a fully functioning infrastructure to respond effectively to the Surgeon General’s call for accelerating the national reduction in tobacco use. The literature describes common elements of infrastructure; however, a lack of valid and reliable measures has made it difficult for program planners to monitor relevant infrastructure indicators and address observed deficiencies, or for evaluators to determine the association among infrastructure, program efforts, and program outcomes. The Component Model of Infrastructure (CMI) is a comprehensive, evidence-based framework that facilitates TCP program planning efforts to develop and maintain their infrastructure. Measures of CMI components were needed to evaluate the model’s utility and predictive capability for assessing infrastructure. This paper describes the development of CMI measures and results of a pilot test with nine state TCP managers. Pilot test findings indicate that the tool has good face validity and is clear and easy to follow. The CMI tool yields data that can enhance public health efforts in a funding-constrained environment and provides insight into program sustainability. Ultimately, the CMI measurement tool could facilitate better evaluation and program planning across public health programs. PMID:27037655

  17. Measuring infrastructure: A key step in program evaluation and planning.

    PubMed

    Schmitt, Carol L; Glasgow, LaShawn; Lavinghouze, S Rene; Rieker, Patricia P; Fulmer, Erika; McAleer, Kelly; Rogers, Todd

    2016-06-01

    State tobacco prevention and control programs (TCPs) require a fully functioning infrastructure to respond effectively to the Surgeon General's call for accelerating the national reduction in tobacco use. The literature describes common elements of infrastructure; however, a lack of valid and reliable measures has made it difficult for program planners to monitor relevant infrastructure indicators and address observed deficiencies, or for evaluators to determine the association among infrastructure, program efforts, and program outcomes. The Component Model of Infrastructure (CMI) is a comprehensive, evidence-based framework that facilitates TCP program planning efforts to develop and maintain their infrastructure. Measures of CMI components were needed to evaluate the model's utility and predictive capability for assessing infrastructure. This paper describes the development of CMI measures and results of a pilot test with nine state TCP managers. Pilot test findings indicate that the tool has good face validity and is clear and easy to follow. The CMI tool yields data that can enhance public health efforts in a funding-constrained environment and provides insight into program sustainability. Ultimately, the CMI measurement tool could facilitate better evaluation and program planning across public health programs. Copyright © 2016 Elsevier Ltd. All rights reserved.

  18. 2010-2014 Pollution Prevention Program Strategic Plan

    EPA Pesticide Factsheets

    This Strategic Plan identifies a number of opportunities for EPA's Pollution Prevention (P2) Program to help reduce: the emission of greenhouse gasses; the use of hazardous materials; and the use of natural resources, while contributing to a greener and more sustainable economy.

  19. Multi-Year Program Plan 2011-2015

    SciTech Connect

    none,

    2010-12-01

    The Vehicle Technologies Multi-Year Program Plan, FY 2011 – 2015, outlines the scientific research and technologies developments for the five-year timeframe (beyond the FY 2010 base year) that need to be undertaken to help meet the Administration's goals for reductions in oil consumption and carbon emissions from the ground transport vehicle sector of the economy.

  20. Waste feed delivery program systems engineering implementation plan

    SciTech Connect

    O`Toole, S.M.

    1998-09-24

    This document defines the systems engineering processes and products planned by the Waste Feed Delivery Program to develop the necessary and sufficient systems to provide waste feed to the Privatization Contractor for Phase 1. It defines roles and responsibilities for the performance of the systems engineering processes and generation of products.

  1. 45 CFR 1355.35 - Program improvement plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION ON CHILDREN, YOUTH AND FAMILIES, FOSTER CARE MAINTENANCE PAYMENTS, ADOPTION ASSISTANCE, AND CHILD AND FAMILY SERVICES GENERAL § 1355.35 Program improvement... to assign the contents of the plan and/or the degree of improvement required for successful...

  2. MAP - a mapping and analysis program for harvest planning

    Treesearch

    Robert N. Eli; Chris B. LeDoux; Penn A. Peters

    1984-01-01

    The Northeastern Forest Experiment Station and the Department of Civil Engineering at West Virginia University are cooperating in the development of a Mapping and Analysis Program, to be named MAP. The goal of this computer software package is to significantly improve the planning and harvest efficiency of small to moderately sized harvest units located in mountainous...

  3. 10 CFR 603.885 - Updated program plans and budgets.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Updated program plans and budgets. 603.885 Section 603.885 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS TECHNOLOGY INVESTMENT AGREEMENTS Award Terms Related to Other Administrative Matters Financial and Programmatic Reporting § 603.885 Updated...

  4. The planning and control of NASA programs and resources

    NASA Technical Reports Server (NTRS)

    1983-01-01

    The major management systems used to plan and control NASA programs and resources are described as well as their integration to form the agency's general management approach in carrying out its mission. Documents containing more detailed descriptions of the processes and techniques involved in the agency's major management systems are listed.

  5. Program Planning & Proposal Writing. Expanded Version. Grantsmanship Center Reprint Series.

    ERIC Educational Resources Information Center

    Kiritz, Norton J.

    Designed to assist both grantmaking agencies and applicants for funding, this proposal format describes and provides examples of the components of program planning and proposal writing. Each of the components is followed by a checklist. The first component clearly and concisely summarizes the request. The proposal introduction describes the…

  6. Planning and Costing Implications in American Teacher Education Programs.

    ERIC Educational Resources Information Center

    Goddu, Roland

    This report presents a costing model for teacher education programs. It explains that this is necessary since most teacher education innovations in the United States extensively use technological support, and involve high cost personnel, materials, and systems. The report also notes that the present state in planning and cost projections requires…

  7. Orbit attitude processor. STS-1 bench program verification test plan

    NASA Technical Reports Server (NTRS)

    Mcclain, C. R.

    1980-01-01

    A plan for the static verification of the STS-1 ATT PROC ORBIT software requirements is presented. The orbit version of the SAPIENS bench program is used to generate the verification data. A brief discussion of the simulation software and flight software modules is presented along with a description of the test cases.

  8. THE RICHMOND PLAN--THE PRE-TECHNICIAN PREPARATORY PROGRAM.

    ERIC Educational Resources Information Center

    FELDMAN, M.; AND OTHERS

    THE PURPOSE OF AN EXPERIMENTAL PLAN FOR TRAINING TECHNICALLY ORIENTED STUDENTS IN THE LAST 2 YEARS OF HIGH SCHOOL IS TO MOTIVATE UNDERACHIEVERS, POTENTIAL DROPOUTS, AND PROBLEM STUDENTS WITH MECHANICAL APTITUDES SO THAT THEY CAN REALIZE CONCRETE GOALS LEADING EITHER TO EMPLOYMENT OR TO CONTINUED EDUCATION. THE PROGRAM IS COMPOSED OF A 2-YEAR…

  9. Have a Bearable Summer: '86 Summer Reading Program Planning Manual.

    ERIC Educational Resources Information Center

    Jackson, Mary

    Because studies have found that children can lose a year in their reading skills and motivation during summers, this planning guide suggests ways for librarians to interest children in a summer reading program by appealing to their fascination with bears and teddy bears. The guide is organized chronologically, beginning with a timetable, followed…

  10. Academic Planning through Program Review: Can It Work?

    ERIC Educational Resources Information Center

    Fernandez, Thomas V.; Raab, Marjorie K.

    Nassau Community College (NCC) is currently working with a program evaluation model in which faculty from one department serve as peer evaluation consultants to direct the self-evaluations of other departments. The four functional objectives initially motivating the development of NCC's plan directed that: real decisions about academic programs…

  11. TTIP: Texas Teacher Internship Program: 1995 Curriculum Implementation Plans.

    ERIC Educational Resources Information Center

    Walenta, Brian T., Ed.

    In 1989 the Texas Alliance for Science, Technology and Mathematics Education began placing teachers of all levels at industry sites as part of its Texas Teacher Internship Program. In 1995, 15 teachers interned at 11 sites. Each teacher was required to develop a curriculum implementation plan which was to illustrate how they would translate the…

  12. Planning Strategic Communications and Outreach for the Solar Program

    SciTech Connect

    Pedigo, S.; Nahan, R.; Moon, S.; Gwinner, D.; Brooks, C.; Butler Burt, W.

    2005-01-01

    Advances made through the Solar Program in photovoltaic and solar thermal technologies must be well communicated to appropriate audiences if further technical and market growth will occur. As the Program's communications team, we developed a plan to: (1) integrate communications across the various solar technologies and reduce redundancy; (2) target audiences and messages strategically; (3) respond better to changes in markets, technology perceptions, audiences, and funding; (4) develop communication projects within the context of other relevant plans (e.g., Solar Program Multi-Year Technical Plan); (5) leverage limited resources; and (6) cultivate a multiyear mentality. Our approach included profiling eight key audiences, including their perceptions of solar technologies; formulating audience-specific messages and communication objectives and strategies; and proposing communications tactics to reinforce the objectives. Presently, we are conducting a needs assessment of print products, as well as a gap analysis. We will then prioritize projects, complete high-priority projects, measure effectiveness of selected projects and the plan, and seek strategic connections with other activities and programs.

  13. Preservation at Stony Brook. Preservation Planning Program. Study Report.

    ERIC Educational Resources Information Center

    Cook, Donald C.; And Others

    This final report is a product of a Preservation Planning Program (PPP) self-study conducted by the State University of New York (SUNY), Stony Brook, working with the Association of Research Libraries' (ARL) Office of Management Studies (OMS). The PPP is designed to put self-help tools into the hands of library staff responsible for developing…

  14. 10 CFR 603.885 - Updated program plans and budgets.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Updated program plans and budgets. 603.885 Section 603.885 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS TECHNOLOGY INVESTMENT AGREEMENTS Award Terms Related to Other Administrative Matters Financial and Programmatic Reporting § 603.885 Updated...

  15. 10 CFR 603.885 - Updated program plans and budgets.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Updated program plans and budgets. 603.885 Section 603.885 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS TECHNOLOGY INVESTMENT AGREEMENTS Award Terms Related to Other Administrative Matters Financial and Programmatic Reporting § 603.885 Updated...

  16. 10 CFR 603.885 - Updated program plans and budgets.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Updated program plans and budgets. 603.885 Section 603.885 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS TECHNOLOGY INVESTMENT AGREEMENTS Award Terms Related to Other Administrative Matters Financial and Programmatic Reporting § 603.885 Updated...

  17. World Weather Program: Plan for Fiscal Year 1978.

    ERIC Educational Resources Information Center

    Congress of the U.S., Washington, DC.

    This plan for 1978 describes the initiatives carried out by federal agencies of the United States which support or contribute to the goals of the World Weather Program (WWP). This document has four sections and a list of acronyms. Section one contains a summary of a recently concluded Data Systems Test. The results and lessons learned from this…

  18. Planning Learning Environments for Library Media Programs: An Introduction.

    ERIC Educational Resources Information Center

    Klasing, Jane P.; Callison, Daniel

    1992-01-01

    Klasing discusses the inability of school library facilities to meet current challenges for the delivery of programs and information. Callison then provides an overview of this issue on planning learning environments for school media centers, which contains four articles covering space requirements, ergonomic design, legislation on equal access,…

  19. From Strategic Plan to Sustainable Program: One College's Journey

    ERIC Educational Resources Information Center

    Rush, Carol A.

    2010-01-01

    Westmoreland County Community College focused on enhancing success for first-time, full-time, degree-seeking students testing into two or more developmental courses. The project progressed from a planning objective, to a program on a sliding-scale budget, to becoming sustainable in five years. Results include improved retention and enhanced data…

  20. Phased project planning and development in anticipation of operational programs

    NASA Technical Reports Server (NTRS)

    Stroud, W. G.

    1973-01-01

    The impact of future operational status on the planning and execution of the research and development activities for major space flight projects is assessed. These projects, within NASA, are part of the Applications Program involving communications and meteorology. The NASA management approach to these projects is determined by national policies governing the responsibilities and relationships among the various government agencies and private industries.