  1. Accelerated test design

    NASA Technical Reports Server (NTRS)

    Mcdermott, P. P.

    1980-01-01

    The design of an accelerated life test program for electric batteries is discussed. A number of observations and suggestions on the procedures and objectives for conducting an accelerated life test program are presented. Equations based on nonlinear regression analysis for predicting the accelerated life test parameters are discussed.

  2. Results and comparison of seven accelerated cycling test procedures for the photovoltaic application

    NASA Astrophysics Data System (ADS)

    Potteau, E.; Desmettre, D.; Mattera, F.; Bach, O.; Martin, J.-L.; Malbranche, P.

    Choosing the right battery for a given photovoltaic (PV) system is a key question, because it strongly influences the cost and reliability of the system. This paper presents results of seven test procedures experienced at the GENEC battery test facility. A set of four complementary tests is selected, covering the various types of photovoltaic systems. Moreover, the analysis of these results gives an estimation of the ageing rate for the different types of batteries used in photovoltaic systems.

  3. Risk Assessment of a New Acceptance Testing Procedure for Conventional Linear Accelerators.

    PubMed

    Harry, Taylor; Yaddanapudi, Sridhar; Cai, Bin; Stinson, Keith; Goddu, S Murty; Noel, Camille; Mutic, Sasa; Pawlicki, Todd

    2017-08-23

    New techniques and materials have recently been developed to expedite the conventional linac acceptance testing procedure(1) which use the electronic portal imaging device (EPID) for data collection. This new procedure is designed to be more efficient and robust than the conventional approach. The purpose of this work is to perform a comparative risk assessment of the two acceptance testing procedures (ATPs). Failure Modes and Effects Analysis was used to assess risks for both ATP approaches. Five domain experts (Medical Physicists) comprised the analysis team. The risk assessment method and ranking scales were adopted from the AAPM TG-100. The number of failure pathways and associated risk priority numbers (RPNs) for the two ATP approaches were compared. RPNs > 100 were considered high-priority failure modes. Fewer failure pathways were determined for the new ATP (ATPEPID ) compared to the conventional ATP (ATPconv ) resulting in a 44% difference (n = 233 versus n = 534, respectively). There were also 35% fewer RPNs > 100 for the ATPEPID (n = 40) compared to the ATPconv (n = 114). Failure pathways and RPNs > 100 for individual ATP tests were 2.0 and 3.5 times higher, on average, for the ATPconv compared to the ATPEPID , respectively. The EPID pixel sensitivity map was identified as a high risk failure for the ATPEPID . Potential errors due to human factors were decreased for the ATPEPID compared to ATPconv so it is possible that a largely automated linac ATP can mitigate many error occurrences. Manufacturers should be careful when designing an EPID-based ATP to address errors in the EPID pixel sensitivity map which can potentially lead to a significant impact on patients' treatment. This article is protected by copyright. All rights reserved. This article is protected by copyright. All rights reserved.

  4. Accelerated Stress-Corrosion Testing

    NASA Technical Reports Server (NTRS)

    1986-01-01

    Test procedures for accelerated stress-corrosion testing of high-strength aluminum alloys faster and provide more quantitative information than traditional pass/fail tests. Method uses data from tests on specimen sets exposed to corrosive environment at several levels of applied static tensile stress for selected exposure times then subsequently tensile tested to failure. Method potentially applicable to other degrading phenomena (such as fatigue, corrosion fatigue, fretting, wear, and creep) that promote development and growth of cracklike flaws within material.

  5. Accelerated Stress-Corrosion Testing

    NASA Technical Reports Server (NTRS)

    1986-01-01

    Test procedures for accelerated stress-corrosion testing of high-strength aluminum alloys faster and provide more quantitative information than traditional pass/fail tests. Method uses data from tests on specimen sets exposed to corrosive environment at several levels of applied static tensile stress for selected exposure times then subsequently tensile tested to failure. Method potentially applicable to other degrading phenomena (such as fatigue, corrosion fatigue, fretting, wear, and creep) that promote development and growth of cracklike flaws within material.

  6. Accelerated Corrosion Testing

    DTIC Science & Technology

    1982-12-01

    conducted on high-strength 4340 steel and 7075-T6 aluminum alloy usina accelerating pollutants such as sulfur dinxide, nitrogen dioxide, surface salt...CONTROLLED 100 ATMOSPHERES APPiENDIX B - ACCELERATED ATMDSPHERIC-CORROSION TESTING 128 v I. LIST OF ILLUSTRATIONS Ficure Page 1 Schematic Diagram of Applied...Static-Load Crack-Growth Rate (from ref. 17). 26 12 Environmental-System Flow Diagram . 33 13 Compact-Tension Plane-Strain Fracture-Toughness Specimen

  7. 5 CFR 179.308 - Accelerated procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Accelerated procedures. 179.308 Section 179.308 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS CLAIMS COLLECTION STANDARDS Administrative Offset § 179.308 Accelerated procedures. OPM may make an administrative...

  8. 5 CFR 179.308 - Accelerated procedures.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 5 Administrative Personnel 1 2014-01-01 2014-01-01 false Accelerated procedures. 179.308 Section 179.308 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS CLAIMS COLLECTION STANDARDS Administrative Offset § 179.308 Accelerated procedures. OPM may make an administrative...

  9. Microwave power coupler for a superconducting multiple-cell cavity for accelerator application and its testing procedures

    SciTech Connect

    Li, Jianjian

    2008-12-01

    Superconducting cavity resonators offer the advantage of high field intensity for a given input power, making them an attractive contender for particle accelerator applications. Power coupling into a superconducting cavity employed in a particle accelerator requires unique provisions to maintain high vacuum and cryogenic temperature on the cavity side, while operating with ambient conditions on the source side. Components introduced to fulfill mechanical requirements must show negligible obstruction of the propagation of the microwave with absence of critical locations that may give rise to electron multipaction, leading to a multiple section design, instead of an aperture, a probe, or a loop structure as found in conventional cavities. A coaxial power coupler for a superconducting multiple-cell cavity at 3.9 GHz has been developed. The cavity is intended to be employed as an accelerator to provide enhanced electron beam quality in a free-electron laser in Hamburg (FLASH) user facility. The design of the coupler called for two windows to sustain high vacuum in the cavity and two bellows to accommodate mechanical dimensional changes resulting from cryogenics. Suppression of multipacting was accomplished by the choice of conductor dimensions and materials with low second yield coefficients. Prior to integration with the cavity, the coupler was tested for intrinsic properties in a back-to-back configuration and conditioned for high-power operation with increasing power input. Maximum incident power was measured to be 61 kW. When integrated with the superconducting cavity, a loaded quality factor of 9 x 10 5 was measured by transient method. Coupler return loss and insertion loss were estimated to be around -21 dB and -0.2 dB, respectively.

  10. Procedure for developing experimental designs for accelerated tests for service-life prediction. [for solar cell modules

    NASA Technical Reports Server (NTRS)

    Thomas, R. E.; Gaines, G. B.

    1978-01-01

    Recommended design procedures to reduce the complete factorial design by retaining information on anticipated important interaction effects, and by generally giving up information on unconditional main effects are discussed. A hypothetical photovoltaic module used in the test design is presented. Judgments were made of the relative importance of various environmental stresses such as UV radiation, abrasion, chemical attack, temperature, mechanical stress, relative humidity and voltage. Consideration is given to a complete factorial design and its graphical representation, elimination of selected test conditions, examination and improvement of an engineering design, and parametric study. The resulting design consists of a mix of conditional main effects and conditional interactions and represents a compromise between engineering and statistical requirements.

  11. A novel phantom and procedure providing submillimeter accuracy in daily QA tests of accelerators used for stereotactic radiosurgery*.

    PubMed

    Brezovich, Ivan A; Popple, Richard A; Duan, Jun; Shen, Sui; Wu, Xingen; Benhabib, Sidi; Huang, Mi; Cardan, Rex A

    2016-07-08

    Stereotactic radiosurgery (SRS) places great demands on spatial accuracy. Steel BBs used as markers in quality assurance (QA) phantoms are clearly visible in MV and planar kV images, but artifacts compromise cone-beam CT (CBCT) isocenter localization. The purpose of this work was to develop a QA phantom for measuring with sub-mm accuracy isocenter congruence of planar kV, MV, and CBCT imaging systems and to design a practical QA procedure that includes daily Winston-Lutz (WL) tests and does not require computer aid. The salient feature of the phantom (Universal Alignment Ball (UAB)) is a novel marker for precisely localizing isocenters of CBCT, planar kV, and MV beams. It consists of a 25.4mm diameter sphere of polymethylmetacrylate (PMMA) containing a concentric 6.35mm diameter tungsten carbide ball. The large density difference between PMMA and the polystyrene foam in which the PMMA sphere is embedded yields a sharp image of the sphere for accurate CBCT registration. The tungsten carbide ball serves in finding isocenter in planar kV and MV images and in doing WL tests. With the aid of the UAB, CBCT isocenter was located within 0.10 ± 0.05 mm of its true positon, and MV isocenter was pinpointed in planar images to within 0.06 ± 0.04mm. In clinical morning QA tests extending over an 18 months period the UAB consistently yielded measurements with sub-mm accuracy. The average distance between isocenter defined by orthogonal kV images and CBCT measured 0.16 ± 0.12 mm. In WL tests the central ray of anterior beams defined by a 1.5 × 1.5 cm2 MLC field agreed with CBCT isocenter within 0.03 ± 0.14 mm in the lateral direction and within 0.10 ± 0.19 mm in the longitudinal direction. Lateral MV beams approached CBCT isocenter within 0.00 ± 0.11 mm in the vertical direction and within -0.14 ± 0.15 mm longitudinally. It took therapists about 10 min to do the tests. The novel QA phantom allows pinpointing CBCT and MV isocenter positions to better than 0.2 mm, using

  12. Accelerated test plan for nickel cadmium spacecraft batteries

    NASA Technical Reports Server (NTRS)

    Hennigan, T. J.

    1973-01-01

    An accelerated test matrix is outlined that includes acceptance, baseline and post-cycling tests, chemical and physical analyses, and the data analysis procedures to be used in determining the feasibility of an accelerated test for sealed, nickel cadmium cells.

  13. Accelerated stress testing of terrestrial solar cells

    NASA Technical Reports Server (NTRS)

    Prince, J. L.; Lathrop, J. W.

    1979-01-01

    A program to investigate the reliability characteristics of unencapsulated low-cost terrestrial solar cells using accelerated stress testing is described. Reliability (or parametric degradation) factors appropriate to the cell technologies and use conditions were studied and a series of accelerated stress tests was synthesized. An electrical measurement procedure and a data analysis and management system was derived, and stress test fixturing and material flow procedures were set up after consideration was given to the number of cells to be stress tested and measured and the nature of the information to be obtained from the process. Selected results and conclusions are presented.

  14. Accelerated testing of space mechanisms

    NASA Technical Reports Server (NTRS)

    Murray, S. Frank; Heshmat, Hooshang

    1995-01-01

    This report contains a review of various existing life prediction techniques used for a wide range of space mechanisms. Life prediction techniques utilized in other non-space fields such as turbine engine design are also reviewed for applicability to many space mechanism issues. The development of new concepts on how various tribological processes are involved in the life of the complex mechanisms used for space applications are examined. A 'roadmap' for the complete implementation of a tribological prediction approach for complex mechanical systems including standard procedures for test planning, analytical models for life prediction and experimental verification of the life prediction and accelerated testing techniques are discussed. A plan is presented to demonstrate a method for predicting the life and/or performance of a selected space mechanism mechanical component.

  15. Environmental Test Screening Procedure

    NASA Technical Reports Server (NTRS)

    Zeidler, Janet

    2000-01-01

    This procedure describes the methods to be used for environmental stress screening (ESS) of the Lightning Mapper Sensor (LMS) lens assembly. Unless otherwise specified, the procedures shall be completed in the order listed, prior to performance of the Acceptance Test Procedure (ATP). The first unit, S/N 001, will be subjected to the Qualification Vibration Levels, while the remainder will be tested at the Operational Level. Prior to ESS, all units will undergo Pre-ESS Functional Testing that includes measuring the on-axis and plus or minus 0.95 full field Modulation Transfer Function and Back Focal Length. Next, all units will undergo ESS testing, and then Acceptance testing per PR 460.

  16. Toddler test or procedure preparation

    MedlinePlus

    Preparing toddler for test/procedure; Test/procedure preparation - toddler; Preparing for a medical test or procedure - toddler ... Before the test, know that your child will probably cry. Even if you prepare, your child may feel some discomfort or ...

  17. Accelerated testing of space batteries

    NASA Technical Reports Server (NTRS)

    Mccallum, J.; Thomas, R. E.; Waite, J. H.

    1973-01-01

    An accelerated life test program for space batteries is presented that fully satisfies empirical, statistical, and physical criteria for validity. The program includes thermal and other nonmechanical stress analyses as well as mechanical stress, strain, and rate of strain measurements.

  18. Preschooler test or procedure preparation

    MedlinePlus

    Preparing preschoolers for test/procedure; Test/procedure preparation - preschooler ... Preparing children for medical tests can reduce their anxiety. It can also make them less likely to cry and resist the procedure. Research shows that ...

  19. Accelerated Test Methods

    NASA Technical Reports Server (NTRS)

    Jansen, Ralph

    1995-01-01

    Neural network systems were evaluated for use in predicting wear of mechanical systems. Three different neural network software simulation packages were utilized in order to create models of tribological wear tests. Representative simple, medium, and high complexity simulation packages were selected. Pin-on-disk, rub shoe, and four-ball tribological test data was used for training, testing, and verification of the neural network models. Results showed mixed success. The neural networks were able to predict results with some accuracy if the number of input variables was low or the amount of training data was high. Increased neural network complexity resulted in more accurate results, however there was a point of diminishing return. Medium complexity models were the best trade off between accuracy and computing time requirements. A NASA Technical Memorandum and a Society of Tribologists and Lubrication Engineers paper are being published which detail the work.

  20. Accelerated Testing Validation

    SciTech Connect

    Mukundan, Rangachary; James, Greg; Davey, John; Langlois, David; Torraco, Dennis; Yoon, Wonseok; Weber, Adam Z; Borup, Rodney L.

    2011-07-01

    The DOE Fuel Cell technical team recommended ASTs were performed on 2 different MEAs (designated P5 and HD6) from Ballard Power Systems. These MEAs were also incorporated into stacks and operated in fuel cell bus modules that were either operated in the field (three P5 buses) in Hamburg, or on an Orange county transit authority drive cycle in the laboratory (HD6 bus module). Qualitative agreement was found in the degradation mechanisms and rates observed in the AST and in the field. The HD6 based MEAs exhibited lower voltage degradation rates (due to catalyst corrosion) and slower membrane degradation rates in the field as reflected by their superior performance in the high potential hold and open-circuit potential AST tests. The quantitative correlation of the degradation rates will have to take into account the various stressors in the field including temperature, relative humidity, start/stops and voltage cycles.

  1. Membrane Degradation Accelerated Stress Test

    SciTech Connect

    Mukundan, Rangachary; Borup, Rodney L.

    2015-01-21

    These are a set of slides that deal with membrane degradation accelerated stress test. Specifically, the following topics are covered: membrane degradation FCTT drive cycle; membrane ASTs; current membrane ASTs damage mechanisms; proposed membrane AST, RH cycling in H2/Air; current proposed AST; 2min/2min AST damage mechanism; 30sec/45sec RH cycling at OCV.

  2. Accelerated leach test development program

    SciTech Connect

    Fuhrmann, M.; Pietrzak, R.F.; Heiser, J.; Franz, E.M.; Colombo, P.

    1990-11-01

    In FY 1989, a draft accelerated leach test for solidified waste was written. Combined test conditions that accelerate leaching were validated through experimental and modeling efforts. A computer program was developed that calculates test results and models leaching mechanisms. This program allows the user to determine if diffusion controls leaching and, if this is the case, to make projections of releases. Leaching mechanisms other than diffusion (diffusion plus source term partitioning and solubility limited leaching) are included in the program is indicators of other processes that may control leaching. Leach test data are presented and modeling results are discussed for laboratory scale waste forms composed of portland cement containing sodium sulfate salt, portland cement containing incinerator ash, and vinyl ester-styrene containing sodium sulfate. 16 refs., 38 figs., 5 tabs.

  3. Diagnostic Tests and Procedures

    MedlinePlus

    ... Blood Tests Cardiac Catheterization Cardiac Magnetic Resonance Imaging (MRI and MRA) Computed Tomography (CT) Scan Echocardiography Electrocardiogram Electrophysiology Studies Exercise Stress Test Holter Monitoring Intravascular Ultrasound Nuclear Stress Test ...

  4. Accelerated life testing of spacecraft subsystems

    NASA Technical Reports Server (NTRS)

    Wiksten, D.; Swanson, J.

    1972-01-01

    The rationale and requirements for conducting accelerated life tests on electronic subsystems of spacecraft are presented. A method for applying data on the reliability and temperature sensitivity of the parts contained in a sybsystem to the selection of accelerated life test parameters is described. Additional considerations affecting the formulation of test requirements are identified, and practical limitations of accelerated aging are described.

  5. The Brookhaven National Laboratory Accelerator Test Facility

    SciTech Connect

    Batchelor, K.

    1992-01-01

    The Brookhaven National Laboratory Accelerator Test Facility comprises a 50 MeV traveling wave electron linear accelerator utilizing a high gradient, photo-excited, raidofrequency electron gun as an injector and an experimental area for study of new acceleration methods or advanced radiation sources using free electron lasers. Early operation of the linear accelerator system including calculated and measured beam parameters are presented together with the experimental program for accelerator physics and free electron laser studies.

  6. The Brookhaven National Laboratory Accelerator Test Facility

    SciTech Connect

    Batchelor, K.

    1992-09-01

    The Brookhaven National Laboratory Accelerator Test Facility comprises a 50 MeV traveling wave electron linear accelerator utilizing a high gradient, photo-excited, raidofrequency electron gun as an injector and an experimental area for study of new acceleration methods or advanced radiation sources using free electron lasers. Early operation of the linear accelerator system including calculated and measured beam parameters are presented together with the experimental program for accelerator physics and free electron laser studies.

  7. Design considerations and test facilities for accelerated radiation effects testing

    NASA Technical Reports Server (NTRS)

    Price, W. E.; Miller, C. G.; Parker, R. H.

    1972-01-01

    Test design parameters for accelerated dose rate radiation effects tests for spacecraft parts and subsystems used in long term mission (years) are detailed. A facility for use in long term accelerated and unaccelerated testing is described.

  8. Accelerators for Fusion Materials Testing

    NASA Astrophysics Data System (ADS)

    Knaster, Juan; Okumura, Yoshikazu

    Fusion materials research is a worldwide endeavor as old as the parallel one working toward the long term stable confinement of ignited plasma. In a fusion reactor, the preservation of the required minimum thermomechanical properties of the in-vessel components exposed to the severe irradiation and heat flux conditions is an indispensable factor for safe operation; it is also an essential goal for the economic viability of fusion. Energy from fusion power will be extracted from the 14 MeV neutron freed as a product of the deuterium-tritium fusion reactions; thus, this kinetic energy must be absorbed and efficiently evacuated and electricity eventually generated by the conventional methods of a thermal power plant. Worldwide technological efforts to understand the degradation of materials exposed to 14 MeV neutron fluxes >1018 m-2s-1, as expected in future fusion power plants, have been intense over the last four decades. Existing neutron sources can reach suitable dpa (“displacement-per-atom”, the figure of merit to assess materials degradation from being exposed to neutron irradiation), but the differences in the neutron spectrum of fission reactors and spallation sources do not allow one to unravel the physics and to anticipate the degradation of materials exposed to fusion neutrons. Fusion irradiation conditions can be achieved through Li (d, xn) nuclear reactions with suitable deuteron beam current and energy, and an adequate flowing lithium screen. This idea triggered in the late 1970s at Los Alamos National Laboratory (LANL) a campaign working toward the feasibility of continuous wave (CW) high current linacs framed by the Fusion Materials Irradiation Test (FMIT) project. These efforts continued with the Low Energy Demonstrating Accelerator (LEDA) (a validating prototype of the canceled Accelerator Production of Tritium (APT) project), which was proposed in 2002 to the fusion community as a 6.7MeV, 100mA CW beam injector for a Li (d, xn) source to bridge

  9. Accelerators for Fusion Materials Testing

    NASA Astrophysics Data System (ADS)

    Knaster, Juan; Okumura, Yoshikazu

    Fusion materials research is a worldwide endeavor as old as the parallel one working toward the long term stable confinement of ignited plasma. In a fusion reactor, the preservation of the required minimum thermomechanical properties of the in-vessel components exposed to the severe irradiation and heat flux conditions is an indispensable factor for safe operation; it is also an essential goal for the economic viability of fusion. Energy from fusion power will be extracted from the 14 MeV neutron freed as a product of the deuterium-tritium fusion reactions; thus, this kinetic energy must be absorbed and efficiently evacuated and electricity eventually generated by the conventional methods of a thermal power plant. Worldwide technological efforts to understand the degradation of materials exposed to 14 MeV neutron fluxes > 1018 m-2s-1, as expected in future fusion power plants, have been intense over the last four decades. Existing neutron sources can reach suitable dpa ("displacement-per-atom", the figure of merit to assess materials degradation from being exposed to neutron irradiation), but the differences in the neutron spectrum of fission reactors and spallation sources do not allow one to unravel the physics and to anticipate the degradation of materials exposed to fusion neutrons. Fusion irradiation conditions can be achieved through Li (d, xn) nuclear reactions with suitable deuteron beam current and energy, and an adequate flowing lithium screen. This idea triggered in the late 1970s at Los Alamos National Laboratory (LANL) a campaign working toward the feasibility of continuous wave (CW) high current linacs framed by the Fusion Materials Irradiation Test (FMIT) project. These efforts continued with the Low Energy Demonstrating Accelerator (LEDA) (a validating prototype of the canceled Accelerator Production of Tritium (APT) project), which was proposed in 2002 to the fusion community as a 6.7MeV, 100mA CW beam injector for a Li (d, xn) source to bridge

  10. Adolescent test or procedure preparation

    MedlinePlus

    ... someone else) during the procedure Playing hand-held video games Using guided imagery Trying other distractions, such as ... about any appearance changes or other possible side effects the test ... from videos that show adolescents of the same age explaining ...

  11. Using accelerated life testing procedures to compare the relative sensitivity of rainbow trout and the federally listed threatened bull trout to three commonly used rangeland herbicides (picloram, 2,4-D, and clopyralid).

    PubMed

    Fairchild, James F; Allert, Ann; Sappington, Linda S; Nelson, Karen J; Valle, Janet

    2008-03-01

    We conducted 96-h static acute toxicity studies to evaluate the relative sensitivity of juveniles of the threatened bull trout (Salvelinus confluentus) and the standard cold-water surrogate rainbow trout (Onchorhyncus mykiss) to three rangeland herbicides commonly used for controlling invasive weeds in the northwestern United States. Relative species sensitivity was compared using three procedures: standard acute toxicity testing, fractional estimates of lethal concentrations, and accelerated life testing chronic estimation procedures. The acutely lethal concentrations (ALC) resulting in 50% mortality at 96 h (96-h ALC50s) were determined using linear regression and indicated that the three herbicides were toxic in the order of picloram acid > 2,4-D acid > clopyralid acid. The 96-h ALC50 values for rainbow trout were as follows: picloram, 41 mg/L; 2.4-D, 707 mg/L; and clopyralid, 700 mg/L. The 96-h ALC50 values for bull trout were as follows: picloram, 24 mg/L; 2.4-D, 398 mg/L; and clopyralid, 802 mg/L. Fractional estimates of safe concentrations, based on 5% of the 96-h ALC50, were conservative (overestimated toxicity) of regression-derived 96-h ALC5 values by an order of magnitude. Accelerated life testing procedures were used to estimate chronic lethal concentrations (CLC) resulting in 1% mortality at 30 d (30-d CLC1) for the three herbicides: picloram (1 mg/L rainbow trout, 5 mg/L bull trout), 2,4-D (56 mg/L rainbow trout, 84 mg/L bull trout), and clopyralid (477 mg/L rainbow trout; 552 mg/L bull trout). Collectively, the results indicated that the standard surrogate rainbow trout is similar in sensitivity to bull trout. Accelerated life testing procedures provided cost-effective, statistically defensible methods for estimating safe chronic concentrations (30-d CLC1s) of herbicides from acute toxicity data because they use statistical models based on the entire mortality:concentration:time data matrix.

  12. Using accelerated life testing procedures to compare the relative sensitivity of rainbow trout and the federally listed threatened bull trout to three commonly used rangeland herbicides (picloram, 2,4-D, and clopyralid)

    USGS Publications Warehouse

    Fairchild, J.F.; Allert, A.; Sappington, L.S.; Nelson, K.J.; Valle, J.

    2008-01-01

    We conducted 96-h static acute toxicity studies to evaluate the relative sensitivity of juveniles of the threatened bull trout (Salvelinus confluentus) and the standard cold-water surrogate rainbow trout (Onchorhyncus mykiss) to three rangeland herbicides commonly used for controlling invasive weeds in the northwestern United States. Relative species sensitivity was compared using three procedures: standard acute toxicity testing, fractional estimates of lethal concentrations, and accelerated life testing chronic estimation procedures. The acutely lethal concentrations (ALC) resulting in 50% mortality at 96 h (96-h ALC50s) were determined using linear regression and indicated that the three herbicides were toxic in the order of picloram acid > 2,4-D acid > clopyralid acid. The 96-h ALC50 values for rainbow trout were as follows: picloram, 41 mg/L; 2.4-D, 707 mg/L; and clopyralid, 700 mg/L. The 96-h ALC50 values for bull trout were as follows: picloram, 24 mg/L; 2.4-D, 398 mg/L; and clopyralid, 802 mg/L. Fractional estimates of safe concentrations, based on 5% of the 96-h ALC50, were conservative (overestimated toxicity) of regression-derived 96-h ALC5 values by an order of magnitude. Accelerated life testing procedures were used to estimate chronic lethal concentrations (CLC) resulting in 1% mortality at 30 d (30-d CLC1) for the three herbicides: picloram (1 mg/L rainbow trout, 5 mg/L bull trout), 2,4-D (56 mg/L rainbow trout, 84 mg/L bull trout), and clopyralid (477 mg/L rainbow trout; 552 mg/L bull trout). Collectively, the results indicated that the standard surrogate rainbow trout is similar in sensitivity to bull trout. Accelerated life testing procedures provided cost-effective, statistically defensible methods for estimating safe chronic concentrations (30-d CLC1s) of herbicides from acute toxicity data because they use statistical models based on the entire mortality:concentration: time data matrix. ?? 2008 SETAC.

  13. Dynamic Multivariate Accelerated Corrosion Test Protocol

    DTIC Science & Technology

    2014-10-01

    include the development of a test chamber, modified to include the synergistic effects of UV and ozone and the exposure of bare and coated samples to yield...prediction of performance lifetime based upon a relatively short timeframe accelerated test. 15. SUBJECT TERMS Corrosion, ozone , ultraviolet...modified to include the synergistic effects of UV and ozone and the exposure of bare and coated samples to yield an accelerated corrosion test. This test

  14. Accelerator Test of an Imaging Calorimeter

    NASA Technical Reports Server (NTRS)

    Christl, Mark J.; Adams, James H., Jr.; Binns, R. W.; Derrickson, J. H.; Fountain, W. F.; Howell, L. W.; Gregory, J. C.; Hink, P. L.; Israel, M. H.; Kippen, R. M.; Whitaker, Ann F. (Technical Monitor)

    2001-01-01

    The Imaging Calorimeter for ACCESS (ICA) utilizes a thin sampling calorimeter concept for direct measurements of high-energy cosmic rays. The ICA design uses arrays of small scintillating fibers to measure the energy and trajectory of the produced cascades. A test instrument has been developed to study the performance of this concept at accelerator energies and for comparison with simulations. Two test exposures have been completed using a CERN test beam. Some results from the accelerator tests are presented.

  15. Inspection system performance test procedure

    SciTech Connect

    Jensen, C.E.

    1995-01-17

    This procedure establishes requirements to administer a performance demonstration test. The test is to demonstrate that the double-shell tank inspection system (DSTIS) supplied by the contractor performs in accordance with the WHC-S-4108, Double-Shell Tank Ultrasonic Inspection Performance Specification, Rev. 2-A, January, 1995. The inspection system is intended to provide ultrasonic (UT) and visual data to determine integrity of the Westinghouse Hanford Company (WHC) site underground waste tanks. The robotic inspection system consists of the following major sub-systems (modules) and components: Mobile control center; Deployment module; Cable management assembly; Robot mechanism; Ultrasonic testing system; Visual testing system; Pneumatic system; Electrical system; and Control system.

  16. 40 CFR 1033.315 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 33 2014-07-01 2014-07-01 false Test procedures. 1033.315 Section 1033... Programs § 1033.315 Test procedures. (a) Test procedures. Use the test procedures described in subpart F of this part, except as specified in this section. (1) You may ask to use other test procedures. We...

  17. 40 CFR 1033.315 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 34 2012-07-01 2012-07-01 false Test procedures. 1033.315 Section 1033... Programs § 1033.315 Test procedures. (a) Test procedures. Use the test procedures described in subpart F of this part, except as specified in this section. (1) You may ask to use other test procedures. We...

  18. 40 CFR 1033.315 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 33 2011-07-01 2011-07-01 false Test procedures. 1033.315 Section 1033... Programs § 1033.315 Test procedures. (a) Test procedures. Use the test procedures described in subpart F of this part, except as specified in this section. (1) You may ask to use other test procedures. We...

  19. 18 CFR 1308.36 - Accelerated appeal procedure.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 2 2012-04-01 2012-04-01 false Accelerated appeal procedure. 1308.36 Section 1308.36 Conservation of Power and Water Resources TENNESSEE VALLEY AUTHORITY... contain only summary findings of fact and conclusions of law. The decision may, at the Hearing...

  20. 18 CFR 1308.36 - Accelerated appeal procedure.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 2 2013-04-01 2012-04-01 true Accelerated appeal procedure. 1308.36 Section 1308.36 Conservation of Power and Water Resources TENNESSEE VALLEY AUTHORITY... contain only summary findings of fact and conclusions of law. The decision may, at the Hearing...

  1. 48 CFR 6302.10 - The ACCELERATED procedure (Rule 10).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false The ACCELERATED procedure (Rule 10). 6302.10 Section 6302.10 Federal Acquisition Regulations System DEPARTMENT OF TRANSPORTATION... informal meeting or a telephone conference with both parties: (1) Identify and simplify the issues...

  2. 18 CFR 1308.36 - Accelerated appeal procedure.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 2 2014-04-01 2014-04-01 false Accelerated appeal procedure. 1308.36 Section 1308.36 Conservation of Power and Water Resources TENNESSEE VALLEY AUTHORITY... contain only summary findings of fact and conclusions of law. The decision may, at the Hearing...

  3. RHIC sextant test: Accelerator systems and performance

    SciTech Connect

    Pilat, F.; Trbojevic, D.; Ahrens, L.

    1997-08-01

    One sextant of the RHIC Collider was commissioned in early 1997 with beam. We describe here the performance of the accelerator systems, instrumentation subsystems and application software. We also describe a ramping test without beam that took place after the commissioning with beam. Finally, we analyze the implications of accelerator systems performance and their impact on the planning for RHIC installation and commissioning.

  4. Testing general relativity on accelerators

    DOE PAGES

    Kalaydzhyan, Tigran

    2015-09-07

    Within the general theory of relativity, the curvature of spacetime is related to the energy and momentum of the present matter and radiation. One of the more specific predictions of general relativity is the deflection of light and particle trajectories in the gravitational field of massive objects. Bending angles for electromagnetic waves and light in particular were measured with a high precision. However, the effect of gravity on relativistic massive particles was never studied experimentally. Here we propose and analyze experiments devoted to that purpose. We demonstrate a high sensitivity of the laser Compton scattering at high energy accelerators tomore » the effects of gravity. The main observable – maximal energy of the scattered photons – would experience a significant shift in the ambient gravitational field even for otherwise negligible violation of the equivalence principle. In conclusion, we confirm predictions of general relativity for ultrarelativistic electrons of energy of tens of GeV at a current level of resolution and expect our work to be a starting point of further high-precision studies on current and future accelerators, such as PETRA, European XFEL and ILC.« less

  5. Accelerated stress testing of terrestrial solar cells

    NASA Technical Reports Server (NTRS)

    Lathrop, J. W.; Hawkins, D. C.; Prince, J. L.; Walker, H. A.

    1982-01-01

    The development of an accelerated test schedule for terrestrial solar cells is described. This schedule, based on anticipated failure modes deduced from a consideration of IC failure mechanisms, involves bias-temperature testing, humidity testing (including both 85-85 and pressure cooker stress), and thermal-cycle thermal-shock testing. Results are described for 12 different unencapsulated cell types. Both gradual electrical degradation and sudden catastrophic mechanical change were observed. These effects can be used to discriminate between cell types and technologies relative to their reliability attributes. Consideration is given to identifying laboratory failure modes which might lead to severe degradation in the field through second quadrant operation. Test results indicate that the ability of most cell types to withstand accelerated stress testing depends more on the manufacturer's design, processing, and worksmanship than on the particular metallization system. Preliminary tests comparing accelerated test results on encapsulated and unencapsulated cells are described.

  6. Accelerated stress testing of terrestrial solar cells

    NASA Technical Reports Server (NTRS)

    Lathrop, J. W.; Hawkins, D. C.; Prince, J. L.; Walker, H. A.

    1982-01-01

    The development of an accelerated test schedule for terrestrial solar cells is described. This schedule, based on anticipated failure modes deduced from a consideration of IC failure mechanisms, involves bias-temperature testing, humidity testing (including both 85-85 and pressure cooker stress), and thermal-cycle thermal-shock testing. Results are described for 12 different unencapsulated cell types. Both gradual electrical degradation and sudden catastrophic mechanical change were observed. These effects can be used to discriminate between cell types and technologies relative to their reliability attributes. Consideration is given to identifying laboratory failure modes which might lead to severe degradation in the field through second quadrant operation. Test results indicate that the ability of most cell types to withstand accelerated stress testing depends more on the manufacturer's design, processing, and worksmanship than on the particular metallization system. Preliminary tests comparing accelerated test results on encapsulated and unencapsulated cells are described.

  7. Accelerated stress testing of terrestrial solar cells

    SciTech Connect

    Lathrop, J.W.; Hawkins, D.C.; Prince, J.L.; Walker, H.A.

    1982-08-01

    The development of an accelerated test schedule for terrestrial solar cells is described. This schedule, based on anticipated failure modes deduced from a consideration of IC failure mechanisms, involves bias-temperature testing, humidity testing (including both 85-85 and pressure cooker stress), and thermal-cycle thermal-shock testing. Results are described for 12 different unencapsulated cell types. Both gradual electrical degradation and sudden catastrophic mechanical change were observed. These effects can be used to discriminate between cell types and technologies relative to their reliability attributes. Consideration is given to identifying laboratory failure modes which might lead to severe degradation in the field through second quadrant operation. Test results indicate that the ability of most cell types to withstand accelerated stress testing depends more on the manufacturer's design, processing, and worksmanship than on the particular metallization system. Preliminary tests comparing accelerated test results on encapsulated and unencapsulated cells are described.

  8. Solid oxide materials research accelerated electrochemical testing

    SciTech Connect

    Windisch, C.; Arey, B.

    1995-08-01

    The objectives of this work were to develop methods for accelerated testing of cathode materials for solid oxide fuel cells under selected operating conditions. The methods would be used to evaluate the performance of LSM cathode material.

  9. A Statistical Perspective on Highly Accelerated Testing

    SciTech Connect

    Thomas, Edward V.

    2015-02-01

    Highly accelerated life testing has been heavily promoted at Sandia (and elsewhere) as a means to rapidly identify product weaknesses caused by flaws in the product's design or manufacturing process. During product development, a small number of units are forced to fail at high stress. The failed units are then examined to determine the root causes of failure. The identification of the root causes of product failures exposed by highly accelerated life testing can instigate changes to the product's design and/or manufacturing process that result in a product with increased reliability. It is widely viewed that this qualitative use of highly accelerated life testing (often associated with the acronym HALT) can be useful. However, highly accelerated life testing has also been proposed as a quantitative means for "demonstrating" the reliability of a product where unreliability is associated with loss of margin via an identified and dominating failure mechanism. It is assumed that the dominant failure mechanism can be accelerated by changing the level of a stress factor that is assumed to be related to the dominant failure mode. In extreme cases, a minimal number of units (often from a pre-production lot) are subjected to a single highly accelerated stress relative to normal use. If no (or, sufficiently few) units fail at this high stress level, some might claim that a certain level of reliability has been demonstrated (relative to normal use conditions). Underlying this claim are assumptions regarding the level of knowledge associated with the relationship between the stress level and the probability of failure. The primary purpose of this document is to discuss (from a statistical perspective) the efficacy of using accelerated life testing protocols (and, in particular, "highly accelerated" protocols) to make quantitative inferences concerning the performance of a product (e.g., reliability) when in fact there is lack-of-knowledge and uncertainty concerning the

  10. Accelerated Testing of Polymeric Composites Using the Dynamic Mechanical Analyzer

    NASA Technical Reports Server (NTRS)

    Abdel-Magid, Becky M.; Gates, Thomas S.

    2000-01-01

    Creep properties of IM7/K3B composite material were obtained using three accelerated test methods at elevated temperatures. Results of flexural creep tests using the dynamic mechanical analyzer (DMA) were compared with results of conventional tensile and compression creep tests. The procedures of the three test methods are described and the results are presented. Despite minor differences in the time shift factor of the creep compliance curves, the DMA results compared favorably with the results from the tensile and compressive creep tests. Some insight is given into establishing correlations between creep compliance in flexure and creep compliance in tension and compression. It is shown that with careful consideration of the limitations of flexure creep, a viable and reliable accelerated test procedure can be developed using the DMA to obtain the viscoelastic properties of composites in extreme environments.

  11. Accelerated Testing Of Photothermal Degradation Of Polymers

    NASA Technical Reports Server (NTRS)

    Kim, Soon Sam; Liang, Ranty Hing; Tsay, Fun-Dow

    1989-01-01

    Electron-spin-resonance (ESR) spectroscopy and Arrhenius plots used to determine maximum safe temperature for accelerated testing of photothermal degradation of polymers. Aging accelerated by increasing illumination, temperature, or both. Results of aging tests at temperatures higher than those encountered in normal use valid as long as mechanism of degradation same throughout range of temperatures. Transition between different mechanisms at some temperature identified via transition between activation energies, manifesting itself as change in slope of Arrhenius plot at that temperature.

  12. 40 CFR 90.508 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 20 2014-07-01 2013-07-01 true Test procedures. 90.508 Section 90.508....508 Test procedures. (a) For nonroad engines subject to the provisions of this subpart, the prescribed test procedures are the appropriate small SI engine test procedures as described in subpart E of...

  13. 10 CFR 431.154 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 3 2011-01-01 2011-01-01 false Test procedures. 431.154 Section 431.154 Energy DEPARTMENT... EQUIPMENT Commercial Clothers Washers Test Procedures § 431.154 Test procedures. The test procedures for residential clothes washers in Appendix J1 to subpart B of part 430 of this title shall be used to...

  14. 40 CFR 89.508 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 21 2013-07-01 2013-07-01 false Test procedures. 89.508 Section 89.508... Test procedures. (a)(1) For nonroad engines subject to the provisions of this subpart, the prescribed test procedures are the nonroad engine 8-mode test procedure as described in subpart E of this...

  15. Next linear collider test accelerator injector upgrade

    SciTech Connect

    Yeremian, A.D.; Miller, R.H.

    1995-12-31

    The Next Linear Collider Test Accelerator (NLCTA) is being constructed at SLAC to demonstrate multibunch beam loading compensation, suppression of higher order deflecting modes and measure transverse components of the accelerating fields in X-band accelerating structures. Currently a simple injector which provides the average current necessary for the beam loading compensations studies is under construction. An injector upgrade is planned to produce bunch trains similar to that of the NLC with microbunch intensity, separation and energy spread, identical to that of NLC. We discuss the design of the NLCTA injector upgrade.

  16. Focusing on accelerated life testing for cylinders

    NASA Astrophysics Data System (ADS)

    Chen, Juan; Ma, Jungong; Wang, Zhanlin; Wank, Andreas

    2008-10-01

    The study of accelerated life test on cylinders for pneumatic industry is covered in this paper. Accelerated life testing is valuable tools to get information quickly on life distribution which is achieved by subjecting the test units to conditions that are more severe than the normal ones. Long lifetime pneumatic cylinders are selected as the test object. Section I covers the fault mechanism analysis, the piston and piston pole parking are the weak units as they are movable parts as well as leakage sources which easily result in the cylinders failure. Liquid temperature and operating frequency are chosen as stresses since their accelerating potentials are available for the specific cylinders. The complete ALT data is presented using Weibull distribution. Estimation for the parameters of failure model and other characteristics of cylinders population life distribution are done successfully. From the 3-axis graph plotted, the effects of each stresses to cylinders can be seen clearly which provide useful results for cylinders researcher and developer.

  17. The accelerated testing of cements in brines

    SciTech Connect

    Krumhansl, J.L.

    1993-12-31

    Cementitious materials may be employed in settings where they face prolonged exposure to Mg-rich brines. This study evaluated the possibility of using high temperatures to accelerate brine-cement reaction rates. Class-H cement coupons were tested in Mg-K-Na-C1- SO{sub 4} brines to 100{degrees}C. MgC1{sub 2}-NaC1 solutions were also employed in a test sequence that extended to 200{degrees}C. It was found that accelerated testing could be used successfully to evaluate the compatability of cementitious materials with such brines.

  18. TMACS Test Procedure TP007: System administration

    SciTech Connect

    Scanlan, P.; Washburn, S.; Seghers, R.

    1994-05-24

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS System Administration functions.

  19. TMACS Test Procedure TP002: Trending

    SciTech Connect

    Scanlan, P.K.

    1994-08-29

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS Trending functions.

  20. 16 CFR 1610.6 - Test procedure.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... FLAMMABILITY OF CLOTHING TEXTILES The Standard § 1610.6 Test procedure. The test procedure is divided into two... (k) and (l). There are some fabrics that require extra attention when preparing test...

  1. 16 CFR 1610.6 - Test procedure.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... FLAMMABILITY OF CLOTHING TEXTILES The Standard § 1610.6 Test procedure. The test procedure is divided into two... (k) and (l). There are some fabrics that require extra attention when preparing test...

  2. Automated Product Test Wafer Procedure

    NASA Astrophysics Data System (ADS)

    Brown, Andrew; Minvielle, Anna; Salugsugan, Anita

    1987-04-01

    An automated test wafer procedure has been developed using the KLA 2020 wafer inspector to measure registration and critical dimensions on production wafers. The procedure reduces operator interactions to loading the wafer and entering information for wafer identification. The analysis of the registration data is performed on a PC using the methods established by Perloff to determine both intrafield and grid errors. These results are then used to correct the stepper. CD data is also analyzed by the program and corrections to the exposure time are calculated. It was found that the KLA 2020 is as much as 10 times faster and 4 times more precise in obtaining registration data then an operator reading optical verniers on a microscope. Due to the high precision of the reading, the analysis does not need a large number of readings to obtain precise and accurate stepper corrections. Further, significant improvements can be obtained by adding registration targets to measure the intrafield errors. Using the KLA 2020 and computer analysis we have demonstrated an ability to reduce the errors for a manually aligned run to a one sigma distribution of 0.09 um for x and y translation, 0.4 PPM for scaling and orthogonality, and 2.3 PPM for rotation from the first test wafer for a GCA 6100. Nearly all of this variation is due to operator misalignment or the inability of the stepper to correct the errors. The corrections with this technique measuring the same wafer are precise to + 0.01 um in translation and + 0.5 PPM for rotation, scaling, and orthogonality. It has also been shown that a simple linear equation can be used to correct exposure time, even when a process is not tightly controlled.

  3. RHIC Sextant Test - Accelerator Systems and Performance

    NASA Astrophysics Data System (ADS)

    Pilat, F.; Ahrens, L.; Brown, K.; Connolly, R.; dell, G. F.; Fischer, W.; Kewisch, J.; Mackay, W.; Mane, V.; Peggs, S.; Satogata, T.; Tepikian, S.; Thompson, P.; Trbojevic, D.; Tsoupas, N.; Wei, J.

    1997-05-01

    One sextant of the RHIC collider and the full AtR (AGS to RHIC) transfer line have been commissioned in early 1997 with beam. We describe here the design and performance of the accelerator systems during the test, such as the magnet and power supply systems, instrumentation subsystems and application software. After reviewing the main milestones of the commissioning we describe a ramping test without beam that took place after the commissioning with beam. Finally, we analyze the implications of accelerator systems preformance and their impact on the plannig for RHIC installation and commissioning.

  4. Accelerated dissolution testing for improved quality assurance.

    PubMed

    Quist, Per Ola; Ostling, Göran

    2002-06-15

    In pharmaceutical production of controlled release tablets and capsules, a rapid and automated at-line dissolution test for quality assurance of semi-products is advantageous. For effective control of the production, the analysis should not take more than about an hour, without loss of correlation to the ordinary (USP) dissolution test of the final product. For almost a decade, the ACDRA apparatus (ACcelerated Dissolution Rate Analysis) have been used for this purpose at AstraZeneca Tablet Production Sweden (TPS). In this paper, we give examples on different ways to accelerate the dissolution process. We use the USP dissolution calibrator tablets of salicylic acid (non-disintegrating type) to illustrate the strategy. We investigate the accelerated dissolution of the dissolution calibrator tablets, and show how it can be correlated with the dissolution in the ordinary USP-II equipment. The dissolution process was accelerated by variation of temperature, solvent and stirring. For example, we show that by increasing the temperature to 70 degrees C, changing the solvent to water, and increasing the stirring, it is possible to accelerate the dissolution by a factor of 5, without any loss of correlation to the dissolution process in the ordinary test.

  5. Accelerated life testing of solar absorber coatings

    NASA Astrophysics Data System (ADS)

    Carlsson, Bo; Moeller, K.; Frei, Ulrich; Koehl, Michael

    1994-09-01

    Results from a comprehensive case study on accelerated life testing of some selective solar collector absorber coatings for DHW systems are reviewed. The study was conducted within Task X `Solar Materials Research and Development' of the IEA Solar Heating and Cooling Program from 1987 to 1992 and is unique due to its quantitative and systematic approach for durability assessment. The work of case study involved the development of both experimental and theoretical tools to aid the assessment of service life or absorber coatings. This entailed performance analysis, failure analysis, microclimate characterization, environmental resistance testing and life date analysis. Predicted in-service degradation of coatings from accelerated life testing was found to be in fairly good agreement both qualitatively and quantitatively with what was actually observed on coatings installed and tested for three years in solar collectors working under typical DHW conditions.

  6. 49 CFR 581.7 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Test procedures. 581.7 Section 581.7 Transportation Other Regulations Relating to Transportation (Continued) NATIONAL HIGHWAY TRAFFIC SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) BUMPER STANDARD § 581.7 Test procedures. (a) Longitudinal impact test procedures. (1) Impact the...

  7. 49 CFR 581.7 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Test procedures. 581.7 Section 581.7... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) BUMPER STANDARD § 581.7 Test procedures. (a) Longitudinal impact test procedures. (1) Impact the vehicle's front surface and its rear surface two times...

  8. 49 CFR 581.7 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Test procedures. 581.7 Section 581.7... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) BUMPER STANDARD § 581.7 Test procedures. (a) Longitudinal impact test procedures. (1) Impact the vehicle's front surface and its rear surface two times...

  9. 40 CFR 90.707 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 20 2014-07-01 2013-07-01 true Test procedures. 90.707 Section 90.707... Program § 90.707 Test procedures. (a)(1) For small SI engines subject to the provisions of this subpart, the prescribed test procedures are specified in subpart E of this part. (2) The Administrator may,...

  10. 40 CFR 205.54 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 26 2013-07-01 2013-07-01 false Test procedures. 205.54 Section 205.54... EQUIPMENT NOISE EMISSION CONTROLS Medium and Heavy Trucks § 205.54 Test procedures. The procedures described in this and subsequent sections will be the test program to determine the conformity of vehicles...

  11. 40 CFR 205.54 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 25 2011-07-01 2011-07-01 false Test procedures. 205.54 Section 205.54... EQUIPMENT NOISE EMISSION CONTROLS Medium and Heavy Trucks § 205.54 Test procedures. The procedures described in this and subsequent sections will be the test program to determine the conformity of vehicles...

  12. Baseline testing procedures for PV modules beyond the qualification testing

    NASA Astrophysics Data System (ADS)

    Schneller, Eric; Shiradkar, Narendra S.; Dhere, Neelkanth G.

    2013-09-01

    The qualification tests described in IEC 61215 for the c-Si PV modules are essentially pass/fail tests that assist in avoiding infant mortality. This paper reports on the baseline test procedure carried out on PV modules at Florida Solar Energy Center that go beyond the pass/fail criteria of the qualification tests and obtain information about the degradation modes and mechanisms. The importance and limitations of the various characterization techniques are described. Electroluminescence imaging has been used to detect and categorize the faults at the cell level. Indoor infrared imaging has been used to study the quality of electrical interconnects in the module. The infrared imaging carried out on the modules while they are undergoing outdoor exposure has provided information about the presence and distribution of hot spots in these modules. Conventionally, the insulation resistance tester has been used mostly for the dry and wet leakage test. In this study, the importance of the polarization index test and voltage excursion test are described. The use of these tests is essential to provide insight into the modes and mechanisms of degradation, during reliability and durability studies of PV modules. A predictive model for the service life of a PV module may be developed through the results obtained from these characterization techniques in conjunction with long-term exposure and accelerated lifetime tests.

  13. Low Energy Accelerator Facility Upgrade and test

    SciTech Connect

    Alford, K.; Chemerisov, S.; Gromov, R.; Hafenrichter, L.; Jonah, C. D.; Tafoya, R.; Wesolowski, K.; Brown, D.; Forknall, S.; Gardner, James; Macrillo, Dave; Zulpo, A.

    2015-01-01

    The Low Energy Accelerator Facility (LEAF) contains a low-energy linac with high average beam power, which was designed and built in the late 1960’s primarily for radiation-chemistry experiments. The maximum beam energy in that configuration was 21 MeV. Although, the installation is old, it is still reliable. The accelerator was repurposed for development of accelerator-based technologies for the production of 99Mo with funding provided by the National Nuclear Security Administration’s Office of Material Management and Minimization (M3 ). An extensive scientific program on the production of radioactive isotopes demanded an upgrade of the accelerator to fit the experimental requirements. Several possible LEAF upgrades were proposed to increase the electron beam energy. The final design proposed the replacement of the old accelerating structures with new ones. In 2011-2012, the new structures were manufactured, installed, and tested with the beam energy up to 50 MeV and average beam power up to 20 kW. LEAF now is an attractive installation for performing research into medical isotope production.

  14. Quick setup of unit test for accelerator controls system

    SciTech Connect

    Fu, W.; D'Ottavio, T.; Gassner, D.; Nemesure, S.; Morris, J.

    2011-03-28

    Testing a single hardware unit of an accelerator control system often requires the setup of a program with graphical user interface. Developing a dedicated application for a specific hardware unit test could be time consuming and the application may become obsolete after the unit tests. This paper documents a methodology for quick design and setup of an interface focused on performing unit tests of accelerator equipment with minimum programming work. The method has three components. The first is a generic accelerator device object (ADO) manager which can be used to setup, store, and log testing controls parameters for any unit testing system. The second involves the design of a TAPE (Tool for Automated Procedure Execution) sequence file that specifies and implements all te testing and control logic. The sting third is the design of a PET (parameter editing tool) page that provides the unit tester with all the necessary control parameters required for testing. This approach has been used for testing the horizontal plane of the Stochastic Cooling Motion Control System at RHIC.

  15. Corticision: A Flapless Procedure to Accelerate Tooth Movement.

    PubMed

    Park, Young Guk

    2016-01-01

    Orthodontic tooth movement results from applied forces to the teeth evoking cellular responses in the teeth and their surrounding tissues, including the periodontal ligament, alveolar bone and gingiva. It is advantageous for the orthodontist to be well informed of the detailed process of the biological events that unfold during tooth movement, since some of these details may differ from one person to another due to biological differences such as periodontal metabolism or alveolar bone density. This led us to emphasize that orthodontics is a field of endeavor where the integration of mechanics and biology is materialized, and to affirm the fact that tooth movement is conducted in individual human beings, each composed of a unique and intricate physiological system. Biological variations may be the foundation of the differences that are frequently observed in the outcomes of orthodontic treatment in particular with reference to treatment duration between patients with similar malocclusions and who were treated identically. A wide diversity of clinical trials has been carried out to control the tissue resistance to facilitate orthodontic tooth movement, which involves biomechanical, pharmaceutical, surgical, electrical regimens or tissue engineering technology. The term 'Corticision' is a neologism which indicates 'cortical bone incision'. It is a minimally invasive periodontal procedure without flap elevation, thus accelerating tooth movement with an enhanced turnover rate of the surrounding structures. This chapter introduces the technical procedure, and the biological background of how such a minor surgical procedure can receive the accelerated tooth movement with impunity and thereby shorten the duration of treatment. © 2016 S. Karger AG, Basel.

  16. Infant test/procedure preparation

    MedlinePlus

    ... treatment rooms where procedures are done. Imitate the behavior you or your provider need the infant to do, such as opening the mouth. Many children's hospitals have child life specialists who are specially ...

  17. 40 CFR 205.54 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Test procedures. 205.54 Section 205.54 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS TRANSPORTATION EQUIPMENT NOISE EMISSION CONTROLS Medium and Heavy Trucks § 205.54 Test procedures. The procedures described...

  18. 4 CFR 22.22 - Accelerated and Small Claims Procedures [Rule 22].

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 4 Accounts 1 2013-01-01 2013-01-01 false Accelerated and Small Claims Procedures . 22.22 Section 22.22 Accounts GOVERNMENT ACCOUNTABILITY OFFICE GENERAL PROCEDURES RULES OF PROCEDURE OF THE GOVERNMENT ACCOUNTABILITY OFFICE CONTRACT APPEALS BOARD § 22.22 Accelerated and Small Claims Procedures . (a...

  19. 4 CFR 22.22 - Accelerated and Small Claims Procedures [Rule 22].

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 4 Accounts 1 2012-01-01 2012-01-01 false Accelerated and Small Claims Procedures . 22.22 Section 22.22 Accounts GOVERNMENT ACCOUNTABILITY OFFICE GENERAL PROCEDURES RULES OF PROCEDURE OF THE GOVERNMENT ACCOUNTABILITY OFFICE CONTRACT APPEALS BOARD § 22.22 Accelerated and Small Claims Procedures . (a...

  20. 4 CFR 22.22 - Accelerated and Small Claims Procedures [Rule 22].

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 4 Accounts 1 2010-01-01 2010-01-01 false Accelerated and Small Claims Procedures . 22.22 Section 22.22 Accounts GOVERNMENT ACCOUNTABILITY OFFICE GENERAL PROCEDURES RULES OF PROCEDURE OF THE GOVERNMENT ACCOUNTABILITY OFFICE CONTRACT APPEALS BOARD § 22.22 Accelerated and Small Claims Procedures . (a...

  1. 4 CFR 22.22 - Accelerated and Small Claims Procedures [Rule 22].

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 4 Accounts 1 2011-01-01 2011-01-01 false Accelerated and Small Claims Procedures [Rule 22]. 22.22 Section 22.22 Accounts GOVERNMENT ACCOUNTABILITY OFFICE GENERAL PROCEDURES RULES OF PROCEDURE OF THE GOVERNMENT ACCOUNTABILITY OFFICE CONTRACT APPEALS BOARD § 22.22 Accelerated and Small Claims Procedures [Rule...

  2. 49 CFR 383.131 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) Information on the requirements described in § 383.71, the implied consent to alcohol testing described in... refusal to comply with such alcohol testing, State procedures described in § 383.73, and other appropriate...; (4) Details of testing procedures, including the purpose of the tests, how to respond, any time...

  3. 16 CFR 1631.4 - Test procedure.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 16 Commercial Practices 2 2012-01-01 2012-01-01 false Test procedure. 1631.4 Section 1631.4... SURFACE FLAMMABILITY OF SMALL CARPETS AND RUGS (FF 2-70) The Standard § 1631.4 Test procedure. (a) Apparatus—(1) Test chamber. The test chamber shall consist of an open top hollow cube made of...

  4. 16 CFR 1630.4 - Test procedure.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 16 Commercial Practices 2 2012-01-01 2012-01-01 false Test procedure. 1630.4 Section 1630.4... SURFACE FLAMMABILITY OF CARPETS AND RUGS (FF 1-70) The Standard § 1630.4 Test procedure. (a) Apparatus—(1) Test chamber. The test chamber shall consist of an open top hollow cube made of noncombustible...

  5. 16 CFR 1510.4 - Test procedure.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 16 Commercial Practices 2 2012-01-01 2012-01-01 false Test procedure. 1510.4 Section 1510.4... REQUIREMENTS FOR RATTLES § 1510.4 Test procedure. Place the test fixture shown in Figure 1 on a horizontal plane surface. Under its own weight and in a non-compressed state apply any portion of the test...

  6. 40 CFR 203.3 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 26 2013-07-01 2013-07-01 false Test procedures. 203.3 Section 203.3 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS LOW-NOISE-EMISSION PRODUCTS § 203.3 Test procedures. (a) The applicant shall test or cause his product to be tested...

  7. 40 CFR 203.3 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 25 2011-07-01 2011-07-01 false Test procedures. 203.3 Section 203.3 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS LOW-NOISE-EMISSION PRODUCTS § 203.3 Test procedures. (a) The applicant shall test or cause his product to be tested...

  8. 40 CFR 203.3 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Test procedures. 203.3 Section 203.3 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS LOW-NOISE-EMISSION PRODUCTS § 203.3 Test procedures. (a) The applicant shall test or cause his product to be tested...

  9. 40 CFR 203.3 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 25 2014-07-01 2014-07-01 false Test procedures. 203.3 Section 203.3 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS LOW-NOISE-EMISSION PRODUCTS § 203.3 Test procedures. (a) The applicant shall test or cause his product to be tested...

  10. 40 CFR 203.3 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 26 2012-07-01 2011-07-01 true Test procedures. 203.3 Section 203.3 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS LOW-NOISE-EMISSION PRODUCTS § 203.3 Test procedures. (a) The applicant shall test or cause his product to be tested...

  11. BNL ACCELERATOR TEST FACILITY CONTROL SYSTEM UPGRADE.

    SciTech Connect

    MALONE,R.; BEN-ZVI,I.; WANG,X.; YAKIMENKO,V.

    2001-06-18

    Brookhaven National Laboratory's Accelerator Test Facility (ATF) has embarked on a complete upgrade of its decade old computer system. The planned improvements affect every major component: processors (Intel Pentium replaces VAXes), operating system (Linux/Real-Time Linux supplants OpenVMS), and data acquisition equipment (fast Ethernet equipment replaces CAMAC serial highway.) This paper summarizes the strategies and progress of the upgrade along with plans for future expansion.

  12. Vacuum system for Advanced Test Accelerator

    SciTech Connect

    Denhoy, B.S.

    1981-09-03

    The Advanced Test Accelerator (ATA) is a pulsed linear electron beam accelerator designed to study charged particle beam propagation. ATA is designed to produce a 10,000 amp 50 MeV, 70 ns electron beam. The electron beam acceleration is accomplished in ferrite loaded cells. Each cell is capable of maintaining a 70 ns 250 kV voltage pulse across a 1 inch gap. The electron beam is contained in a 5 inch diameter, 300 foot long tube. Cryopumps turbomolecular pumps, and mechanical pumps are used to maintain a base pressure of 2 x 10/sup -6/ torr in the beam tube. The accelerator will be installed in an underground tunnel. Due to the radiation environment in the tunnel, the controlling and monitoring of the vacuum equipment, pressures and temperatures will be done from the control room through a computer interface. This paper describes the vacuum system design, the type of vacuum pumps specified, the reasons behind the selection of the pumps and the techniques used for computer interfacing.

  13. Testing a combined vibration and acceleration environment.

    SciTech Connect

    Jepsen, Richard Alan; Romero, Edward F.

    2005-01-01

    Sandia National Laboratories has previously tested a capability to impose a 7.5 g-rms (30 g peak) radial vibration load up to 2 kHz on a 25 lb object with superimposed 50 g acceleration at its centrifuge facility. This was accomplished by attaching a 3,000 lb Unholtz-Dickie mechanical shaker at the end of the centrifuge arm to create a 'Vibrafuge'. However, the combination of non-radial vibration directions, and linear accelerations higher than 50g's are currently not possible because of the load capabilities of the shaker and the stresses on the internal shaker components due to the combined centrifuge acceleration. Therefore, a new technique using amplified piezo-electric actuators has been developed to surpass the limitations of the mechanical shaker system. They are lightweight, modular and would overcome several limitations presented by the current shaker. They are 'scalable', that is, adding more piezo-electric units in parallel or in series can support larger-weight test articles or displacement/frequency regimes. In addition, the units could be mounted on the centrifuge arm in various configurations to provide a variety of input directions. The design along with test results will be presented to demonstrate the capabilities and limitations of the new piezo-electric Vibrafuge.

  14. Beam alignment test for therapy accelerators

    SciTech Connect

    Lutz, W.R.; Larsen, R.D.; Bjarngard, B.D.

    1981-12-01

    Beam spot displacement, collimator asymmetry, and movement of either collimator or gantry rotational axis can cause misalignment of the X ray beam from a therapy accelerator. A test method, sensitive to all the above problems, consists of double-exposing a film, located at the isocenter, for two gantry positions, 180/sup o/ apart. Opposite halves of the field are blocked for each exposure. A lateral shift of one half with respect to the other indicates the presence of one of the problems mentioned above. Additional tests are described, each of which is sensitive to only one of the problems and capable of quantifying the error.

  15. Beam alignment tests for therapy accelerators

    SciTech Connect

    Lutz, W.R.; Larsen, R.D.; Bjarngard, B.E.

    1981-12-01

    Beam spot displacement, collimator asymmetry, and movement of either collimator or gantry rotational axis can cause misalignment of the X ray beam from a therapy accelerator. A test method, sensitive to all the above problems, consists of double-exposing a film, located at the isocenter, for two gantry positions, 180/sup 0/ apart. Opposite halves of the field are blocked for each exposure. A lateral shift of one half with respect to the other indicates the presence of one of the problems mentioned above. Additional tests are described, each of which is sensitive to only one of the problems and capable of quantifying the error.

  16. Ultra-accelerated natural sunlight exposure testing

    DOEpatents

    Jorgensen, Gary J.; Bingham, Carl; Goggin, Rita; Lewandowski, Allan A.; Netter, Judy C.

    2000-06-13

    Process and apparatus for providing ultra accelerated natural sunlight exposure testing of samples under controlled weathering without introducing unrealistic failure mechanisms in exposed materials and without breaking reciprocity relationships between flux exposure levels and cumulative dose that includes multiple concurrent levels of temperature and relative humidity at high levels of natural sunlight comprising: a) concentrating solar flux uniformly; b) directing the controlled uniform sunlight onto sample materials in a chamber enclosing multiple concurrent levels of temperature and relative humidity to allow the sample materials to be subjected to accelerated irradiance exposure factors for a sufficient period of time in days to provide a corresponding time of about at least a years worth of representative weathering of the sample materials.

  17. Commissioning of the Ground Test Accelerator RFQ

    SciTech Connect

    Johnson, K.F.; Sander, O.R.; Atkins, W.H.; Bolme, G.O.; Brown, S.; Connolly, R.; Garnett, R.; Gilpatrick, J.D.; Guy, F.W.; Ingalls, W.B.; Little, C.; Lohson, R.A.; Lloyd, S.; Neuschaefer, G.; Power, J.; Saadatmand, K.; Sandoval, D.P.; Stevens, R.R.; Vaughn, G.; Wadlinger, E.A.; Weiss, R.; Yuan, V.

    1992-01-01

    The Ground Test Accelerator (GTA) has the objective of verifying much of the technology (physics and engineering) required for producing high-brightness, high-current H{sup {minus}} beams. GTA commissioning is staged to verify the beam dynamics design of each major accelerator component as it is brought on-line. The commissioning stages are the 35 key H{sup {minus}} injector, the 2.5 MeV Radio Frequency Quadrupole (RFQ), the Intertank Matching Section (IMS), the 3.2 MeV first 2{beta}{gamma} Drift Tube Linac (DTL-1) module, the 8.7 MeV 2{beta}{gamma} DTL (modules 1--5), and the 24 MeV GTA; all 10 DTL modules. Commissioning results from the RFQ beam experiments will be presented along with comparisons to simulations.

  18. Commissioning of the Ground Test Accelerator RFQ

    SciTech Connect

    Johnson, K.F.; Sander, O.R.; Atkins, W.H.; Bolme, G.O.; Brown, S.; Connolly, R.; Garnett, R.; Gilpatrick, J.D.; Guy, F.W.; Ingalls, W.B.; Little, C.; Lohson, R.A.; Lloyd, S.; Neuschaefer, G.; Power, J.; Saadatmand, K.; Sandoval, D.P.; Stevens, R.R.; Vaughn, G.; Wadlinger, E.A.; Weiss, R.; Yuan, V.

    1992-09-01

    The Ground Test Accelerator (GTA) has the objective of verifying much of the technology (physics and engineering) required for producing high-brightness, high-current H{sup {minus}} beams. GTA commissioning is staged to verify the beam dynamics design of each major accelerator component as it is brought on-line. The commissioning stages are the 35 key H{sup {minus}} injector, the 2.5 MeV Radio Frequency Quadrupole (RFQ), the Intertank Matching Section (IMS), the 3.2 MeV first 2{beta}{gamma} Drift Tube Linac (DTL-1) module, the 8.7 MeV 2{beta}{gamma} DTL (modules 1--5), and the 24 MeV GTA; all 10 DTL modules. Commissioning results from the RFQ beam experiments will be presented along with comparisons to simulations.

  19. 40 CFR 91.507 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 20 2014-07-01 2013-07-01 true Test procedures. 91.507 Section 91.507... EMISSIONS FROM MARINE SPARK-IGNITION ENGINES Manufacturer Production Line Testing Program § 91.507 Test procedures. (a)(1) For marine SI engines subject to the provisions of this subpart, the prescribed...

  20. 16 CFR 1301.7 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 16 Commercial Practices 2 2012-01-01 2012-01-01 false Test procedures. 1301.7 Section 1301.7 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS BAN OF UNSTABLE REFUSE BINS § 1301.7 Test procedures. (a) The refuse bin shall be tested by applying forces...

  1. 10 CFR 474.4 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 3 2011-01-01 2011-01-01 false Test procedures. 474.4 Section 474.4 Energy DEPARTMENT OF...; PETROLEUM-EQUIVALENT FUEL ECONOMY CALCULATION § 474.4 Test procedures. (a) The electric vehicle energy... Schedule and Urban Dynamometer Driving Schedule test cycles at 40 CFR parts 86 and 600. (b) The...

  2. 16 CFR 1201.4 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... surrounded by at least one inch (2.5 centimeters) of water. (ii) Simulated weathering test. The equipment... thickness identical to those submitted for the impact test shall be used. (ii) Weathering tests—(A) (B... paragraph (e)(2)(i) of this section. (ii) Accelerated weathering test. The specimens shall be retained in...

  3. 16 CFR 1201.4 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... surrounded by at least one inch (2.5 centimeters) of water. (ii) Simulated weathering test. The equipment... thickness identical to those submitted for the impact test shall be used. (ii) Weathering tests—(A) (B... paragraph (e)(2)(i) of this section. (ii) Accelerated weathering test. The specimens shall be retained in...

  4. 16 CFR 1201.4 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... surrounded by at least one inch (2.5 centimeters) of water. (ii) Simulated weathering test. The equipment... thickness identical to those submitted for the impact test shall be used. (ii) Weathering tests—(A) (B... paragraph (e)(2)(i) of this section. (ii) Accelerated weathering test. The specimens shall be retained in...

  5. 16 CFR 1201.4 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... surrounded by at least one inch (2.5 centimeters) of water. (ii) Simulated weathering test. The equipment... thickness identical to those submitted for the impact test shall be used. (ii) Weathering tests—(A) (B... paragraph (e)(2)(i) of this section. (ii) Accelerated weathering test. The specimens shall be retained...

  6. The Brookhaven accelerator test facility injection system

    SciTech Connect

    Wang, X.J.; Kirk, H.G.; Pellegrini, C.; McDonald, K.T.; Russell, D.P.

    1989-01-01

    The Brookhaven Accelerator Test Facility (ATF) consists of a 50-MeV/c electron linac and a high-brightness RF-gun both operating at 2856 MHz. An extremely short (a few picoseconds) electron pulse with low transverse emittance is generated by the RF-gun. In order to preserve both longitudinal and transverse emittances, great care must be taken in transporting the electron beam from the RF-gun to the linac. We describe the injection line, present first- and second-order lattice studies of the injection line, and study nonlinear effects on the emittance. 11 refs., 4 figs., 4 tabs.

  7. Degradation mechanisms and accelerated aging test design

    SciTech Connect

    Clough, R L; Gillen, K T

    1985-01-01

    The fundamental mechanisms underlying the chemical degradation of polymers can change as a function of environmental stress level. When this occurs, it greatly complicates any attempt to use accelerated tests for predicting long-term material degradation behaviors. Understanding how degradation mechanisms can change at different stress levels facilitates both the design and the interpretation of aging tests. Oxidative degradation is a predominant mechanism for many polymers exposed to a variety of different environments in the presence of air, and there are two mechanistic considerations which are widely applicable to material oxidation. One involves a physical process, oxygen diffusion, as a rate-limiting step. This mechanism can predominate at high stress levels. The second is a chemical process, the time-dependent decomposition of peroxide species. This leads to chain branching and can become a rate-controlling factor at lower stress levels involving time-scales applicable to use environments. The authors describe methods for identifying the operation of these mechanisms and illustrate the dramatic influence they can have on the degradation behaviors of a number of polymer types. Several commonly used approaches to accelerated aging tests are discussed in light of the behaviors which result from changes in degradation mechanisms. 9 references, 4 figures.

  8. Accelerated Leach Test(s) Program: Annual report

    SciTech Connect

    Dougherty, D.R.; Pietrzak, R.F.; Fuhrmann, M.; Colombo, P.

    1986-09-01

    A computerized data base of LLW leaching data has been developed. Long-term tests on portland cement, bitumen and vinyl ester-styrene (VES) polymer waste forms containing simulated wastes are underway which are designed to identify and evaluate factors that accelerate leaching without changing the mechanisms.

  9. Laboratory Test of Newton's Second Law for Small Accelerations

    SciTech Connect

    Gundlach, J. H.; Schlamminger, S.; Spitzer, C. D.; Choi, K.-Y.; Woodahl, B. A.; Coy, J. J.; Fischbach, E.

    2007-04-13

    We have tested the proportionality of force and acceleration in Newton's second law, F=ma, in the limit of small forces and accelerations. Our tests reach well below the acceleration scales relevant to understanding several current astrophysical puzzles such as the flatness of galactic rotation curves, the Pioneer anomaly, and the Hubble acceleration. We find good agreement with Newton's second law at accelerations as small as 5x10{sup -14} m/s{sup 2}.

  10. Laboratory test of Newton's second law for small accelerations.

    PubMed

    Gundlach, J H; Schlamminger, S; Spitzer, C D; Choi, K-Y; Woodahl, B A; Coy, J J; Fischbach, E

    2007-04-13

    We have tested the proportionality of force and acceleration in Newton's second law, F=ma, in the limit of small forces and accelerations. Our tests reach well below the acceleration scales relevant to understanding several current astrophysical puzzles such as the flatness of galactic rotation curves, the Pioneer anomaly, and the Hubble acceleration. We find good agreement with Newton's second law at accelerations as small as 5 x 10(-14) m/s(2).

  11. Laboratory Test of Newton's Second Law for Small Accelerations

    NASA Astrophysics Data System (ADS)

    Woodahl, Brian; Gundlach, Jens; Schlamminger, Stephan; Spitzer, Chris; Choi, Ki; Coy, Jen; Fischbach, Ephraim

    2009-10-01

    We have tested the proportionality of force and acceleration in Newton's second law, F=ma, in the limit of small forces and accelerations. Our tests reach well below the acceleration scales relevant to understanding several current astrophysical puzzles such as the flatness of galactic rotation curves, the Pioneer anomaly, and the Hubble acceleration. We find good agreement with Newton's second law at accelerations as small as 5 x 10-14 m/s^2.

  12. Laboratory Test of Newton's Second Law for Small Accelerations

    NASA Astrophysics Data System (ADS)

    Gundlach, J. H.; Schlamminger, S.; Spitzer, C. D.; Choi, K.-Y.; Woodahl, B. A.; Coy, J. J.; Fischbach, E.

    2007-04-01

    We have tested the proportionality of force and acceleration in Newton’s second law, F=ma, in the limit of small forces and accelerations. Our tests reach well below the acceleration scales relevant to understanding several current astrophysical puzzles such as the flatness of galactic rotation curves, the Pioneer anomaly, and the Hubble acceleration. We find good agreement with Newton’s second law at accelerations as small as 5×10-14m/s2.

  13. 10 CFR 474.4 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... ENERGY ENERGY CONSERVATION ELECTRIC AND HYBRID VEHICLE RESEARCH, DEVELOPMENT, AND DEMONSTRATION PROGRAM; PETROLEUM-EQUIVALENT FUEL ECONOMY CALCULATION § 474.4 Test procedures. (a) The electric vehicle energy... required for testing the energy consumption of electric vehicles....

  14. 10 CFR 474.4 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... ENERGY ENERGY CONSERVATION ELECTRIC AND HYBRID VEHICLE RESEARCH, DEVELOPMENT, AND DEMONSTRATION PROGRAM; PETROLEUM-EQUIVALENT FUEL ECONOMY CALCULATION § 474.4 Test procedures. (a) The electric vehicle energy... required for testing the energy consumption of electric vehicles....

  15. 10 CFR 474.4 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... ENERGY ENERGY CONSERVATION ELECTRIC AND HYBRID VEHICLE RESEARCH, DEVELOPMENT, AND DEMONSTRATION PROGRAM; PETROLEUM-EQUIVALENT FUEL ECONOMY CALCULATION § 474.4 Test procedures. (a) The electric vehicle energy... required for testing the energy consumption of electric vehicles....

  16. 10 CFR 474.4 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Test procedures. 474.4 Section 474.4 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ELECTRIC AND HYBRID VEHICLE RESEARCH, DEVELOPMENT, AND DEMONSTRATION PROGRAM; PETROLEUM-EQUIVALENT FUEL ECONOMY CALCULATION § 474.4 Test procedures. (a) The electric vehicle energy consumption values used in the calculatio...

  17. 40 CFR 91.607 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 20 2014-07-01 2013-07-01 true Test procedures. 91.607 Section 91.607... EMISSIONS FROM MARINE SPARK-IGNITION ENGINES Selective Enforcement Auditing Regulations § 91.607 Test procedures. (a)(1) For marine SI engines subject to the provisions of this subpart, the prescribed...

  18. 49 CFR 399.209 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 5 2011-10-01 2011-10-01 false Test procedures. 399.209 Section 399.209 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL MOTOR CARRIER SAFETY... STANDARDS Step, Handhold, and Deck Requirements for Commercial Motor Vehicles § 399.209 Test procedures....

  19. Void fraction instrument acceptance test procedure

    SciTech Connect

    Pearce, K.L.

    1994-09-15

    This acceptance test procedure (ATP) was written to test the void fraction instrument (VFI) and verify that the unit is ready for field service. The procedure verifies that the mechanical and electrical features (not specifically addressed in the software ATP) and software alarms are operating as designed.

  20. W-087 Acceptance test procedure. Revision 1

    SciTech Connect

    Joshi, A.W.

    1997-06-10

    This Acceptance Test Procedure/Operational Test Procedure (ATP/OTP) has been prepared to demonstrate that the Electrical/Instrumentation and Mechanical systems function as required by project criteria and to verify proper operation of the integrated system including the interlocks.

  1. 40 CFR 90.508 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 21 2012-07-01 2012-07-01 false Test procedures. 90.508 Section 90.508 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF....508 Test procedures. (a) For nonroad engines subject to the provisions of this subpart, the...

  2. Test Operations Procedure (TOP): Transportability

    DTIC Science & Technology

    2008-09-15

    uninhabited. Photograph the test item slung under each aircraft to document load orientation. When available, videotape the flight test by either an on...foot - 726 kg (1,600 lb). (6) Floor contact pressure - 345 kPa (50 psi). (7) Maximum axle load (pneumatic tires) - 2,268 kg (5,000 lb). (8...Maximum wheel load (pneumatic tires) - 1,134 kg (2,500 lb) (9) Tire pressure - 621 kPa (90 psi). (10) Inadequate ramp clearance for ramp

  3. Nitrogen chiller acceptance test procedure

    SciTech Connect

    Kostelnik, A.J.

    1995-03-07

    This document includes the inspection and testing requirements for the Nitrogen Chiller unit. The Chiller will support the Rotary Mode core Sampling System during the summer. The Chiller cools the Nitrogen Purge Gas that is used when drilling in tank wastes to cool the drill bit.

  4. DACS upgrade acceptance test procedure

    SciTech Connect

    Zuehlke, A.C.

    1994-09-28

    The readiness of the Data Acquisition and Control System (DACS) to provide monitoring and control of the mixer pump, directional drive system, and the instrumentation associated with the SY-101 tank and support systems, and the proper functioning of the DACS with new Model 984-785 Programmable Logic Controllers (PLCs), new MODBUS PLUS version 2.01 software for the PLCs, and version 3.72 of the GENESIS software will be systematically evaluated by performance of this procedure. The DACS, which is housed in a trailer located just outside of the north fence at the SY tank farm, receives input signals from a variety of sensors located in and around the SY-101 tanks. These sensors provide information such as: tank vapor space and ventilation system H{sub 2} concentration; tank waste temperature; tank pressure; waste density; operating pump parameters such as speed, flow, rotational position, discharge pressure, and internal temperature; strain (for major equipment); and waste level. The output of these sensors is conditioned and transmitted to the DACS computers where these signals are displayed, recorded, and monitored for out-of-specification conditions. If abnormal conditions are detected, then, in certain situations, the DACS automatically generates alarms and causes the system to abort pump operations.

  5. 40 CFR 94.506 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... EMISSIONS FROM MARINE COMPRESSION-IGNITION ENGINES Manufacturer Production Line Testing Programs § 94.506... test procedures used in certification for production line testing. (b)(1) The manufacturer may not... subject to adjustment for certification and production line testing, to any setting within the...

  6. 40 CFR 94.506 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... EMISSIONS FROM MARINE COMPRESSION-IGNITION ENGINES Manufacturer Production Line Testing Programs § 94.506... test procedures used in certification for production line testing. (b)(1) The manufacturer may not... subject to adjustment for certification and production line testing, to any setting within the...

  7. 40 CFR 94.506 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... EMISSIONS FROM MARINE COMPRESSION-IGNITION ENGINES Manufacturer Production Line Testing Programs § 94.506... test procedures used in certification for production line testing. (b)(1) The manufacturer may not... subject to adjustment for certification and production line testing, to any setting within the...

  8. 40 CFR 1033.315 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... CONTROL OF EMISSIONS FROM LOCOMOTIVES Manufacturer and Remanufacturer Production Line Testing and Audit... instead of a low mileage locomotive), use the same test procedures for production line testing that you... production line testing, and an adjustment or repair is necessary because of such shipment, you may...

  9. 40 CFR 1033.315 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... CONTROL OF EMISSIONS FROM LOCOMOTIVES Manufacturer and Remanufacturer Production Line Testing and Audit... instead of a low mileage locomotive), use the same test procedures for production line testing that you... production line testing, and an adjustment or repair is necessary because of such shipment, you may...

  10. 40 CFR 94.506 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... EMISSIONS FROM MARINE COMPRESSION-IGNITION ENGINES Manufacturer Production Line Testing Programs § 94.506... test procedures used in certification for production line testing. (b)(1) The manufacturer may not... subject to adjustment for certification and production line testing, to any setting within the...

  11. Hurricane Isabel gives accelerators a severe test

    SciTech Connect

    Swapan Chattopadhyay

    2004-01-01

    Hurricane Isabel was at category five--the most violent on the Saffir-Simpson scale of hurricane strength--when it began threatening the central Atlantic seaboard of the US. Over the course of several days, precautions against the extreme weather conditions were taken across the Jefferson Lab site in south-east Virginia. On 18 September 2003, when Isabel struck North Carolina's Outer Banks and moved northward, directly across the region around the laboratory, the storm was still quite destructive, albeit considerably reduced in strength. The flood surge and trees felled by wind substantially damaged or even devastated buildings and homes, including many belonging to Jefferson Lab staff members. For the laboratory itself, Isabel delivered an unplanned and severe challenge in another form: a power outage that lasted nearly three-and-a-half days, and which severely tested the robustness of Jefferson Lab's two superconducting machines, the Continuous Electron Beam Accelerator Facility (CEBAF) and the superconducting radiofrequency ''driver'' accelerator of the laboratory's free-electron laser. Robustness matters greatly for science at a time when microwave superconducting linear accelerators (linacs) are not only being considered, but in some cases already being built for projects such as neutron sources, rare-isotope accelerators, innovative light sources and TeV-scale electron-positron linear colliders. Hurricane Isabel interrupted a several-week-long maintenance shutdown of CEBAF, which serves nuclear and particle physics and represents the world's pioneering large-scale implementation of superconducting radiofrequency (SRF) technology. The racetrack-shaped machine is actually a pair of 500-600 MeV SRF linacs interconnected by recirculation arc beamlines. CEBAF delivers simultaneous beams at up to 6 GeV to three experimental halls. An imminent upgrade will double the energy to 12 GeV and add an extra hall for ''quark confinement'' studies. On a smaller scale

  12. Accelerated Strength Testing of Thermoplastic Composites

    NASA Technical Reports Server (NTRS)

    Reeder, J. R.; Allen, D. H.; Bradley, W. L.

    1998-01-01

    Constant ramp strength tests on unidirectional thermoplastic composite specimens oriented in the 90 deg. direction were conducted at constant temperatures ranging from 149 C to 232 C. Ramp rates spanning 5 orders of magnitude were tested so that failures occurred in the range from 0.5 sec. to 24 hrs. (0.5 to 100,000 MPa/sec). Below 204 C, time-temperature superposition held allowing strength at longer times to be estimated from strength tests at shorter times but higher temperatures. The data indicated that a 50% drop in strength might be expected for this material when the test time is increased by 9 orders of magnitude. The shift factors derived from compliance data applied well to the strength results. To explain the link between compliance and strength, a viscoelastic fracture model was investigated. The model, which used compliance as input, was found to fit the strength data only if the critical fracture energy was allowed to vary with temperature reduced stress rate. This variation in the critical parameter severely limits its use in developing a robust time-dependent strength model. The significance of this research is therefore seen as providing both the indication that a more versatile acceleration method for strength can be developed and the evidence that such a method is needed.

  13. Stripline kicker for integrable optics test accelerator

    SciTech Connect

    Antipov, Sergey A.; Didenko, Alexander; Lebedev, Valeri; Valishev, Alexander

    2016-06-30

    We present a design of a stripline kicker for Integrable Optics Test Accelerator (IOTA). For its experimental program IOTA needs two full-aperture kickers, capable to create an arbitrary controllable kick in 2D. For that reason their strengths are variable in a wide range of amplitudes up to 16 mrad, and the pulse length 100 ns is less than a revolution period for electrons. In addition, the kicker should have a physical aperture of 40 mm for a proposed operation with proton beam, and an outer size of 70 mm to fit inside existing quadrupole magnets to save space in the ring. Computer simulations using CST Microwave Studio show high field uniformity and wave impedance close to 50 {\\Omega}.

  14. Testing Planck-scale gravity with accelerators.

    PubMed

    Gharibyan, Vahagn

    2012-10-05

    Quantum or torsion gravity models predict unusual properties of space-time at very short distances. In particular, near the Planck length, around 10(-35)  m, empty space may behave as a crystal, singly or doubly refractive. However, this hypothesis remains uncheckable for any direct measurement, since the smallest distance accessible in experiment is about 10(-19)  m at the LHC. Here I propose a laboratory test to measure the space refractivity and birefringence induced by gravity. A sensitivity from 10(-31)  m down to the Planck length could be reached at existent GeV and future TeV energy lepton accelerators using laser Compton scattering. There are already experimental hints for gravity signature at distances approaching the Planck length by 5-7 orders of magnitude, derived from SLC and HERA data.

  15. Testing Planck-Scale Gravity with Accelerators

    NASA Astrophysics Data System (ADS)

    Gharibyan, Vahagn

    2012-10-01

    Quantum or torsion gravity models predict unusual properties of space-time at very short distances. In particular, near the Planck length, around 10-35m, empty space may behave as a crystal, singly or doubly refractive. However, this hypothesis remains uncheckable for any direct measurement, since the smallest distance accessible in experiment is about 10-19m at the LHC. Here I propose a laboratory test to measure the space refractivity and birefringence induced by gravity. A sensitivity from 10-31m down to the Planck length could be reached at existent GeV and future TeV energy lepton accelerators using laser Compton scattering. There are already experimental hints for gravity signature at distances approaching the Planck length by 5-7 orders of magnitude, derived from SLC and HERA data.

  16. Planck Scale Gravity Test with Accelerators

    NASA Astrophysics Data System (ADS)

    Gharibyan, V.

    2015-01-01

    Quantum or torsion gravity models predict unusual properties of space-time at very short distances. In particular, near the Planck length, around 10-35m, empty space may behave as a crystal, singly or doubly refractive. However, this hypothesis remains uncheckable for any direct measurement since the smallest distance accessible in experiment is about 10-19m at the LHC. Here I propose a laboratory test to measure the space refractivity and birefringence induced by gravity. A sensitivity from 10-31m down to the Planck length could be reached at existent GeV and future TeV energy lepton accelerators using laser Compton scattering. There are already experimental hints for gravity signature at distances approaching the Planck length by 5-7 orders of magnitude, derived from SLC and HERA data.

  17. 40 CFR 53.64 - Test procedure: Static fractionator test.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 6 2014-07-01 2014-07-01 false Test procedure: Static fractionator... Performance Characteristics of Class II Equivalent Methods for PM 2.5 § 53.64 Test procedure: Static... when reevaluating the curve as specified in the loading test. (2) Static chamber method....

  18. 40 CFR 53.64 - Test procedure: Static fractionator test.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 6 2012-07-01 2012-07-01 false Test procedure: Static fractionator... Performance Characteristics of Class II Equivalent Methods for PM2.5 § 53.64 Test procedure: Static... when reevaluating the curve as specified in the loading test. (2) Static chamber method....

  19. 40 CFR 53.64 - Test procedure: Static fractionator test.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 5 2011-07-01 2011-07-01 false Test procedure: Static fractionator... Performance Characteristics of Class II Equivalent Methods for PM2.5 § 53.64 Test procedure: Static... when reevaluating the curve as specified in the loading test. (2) Static chamber method....

  20. 40 CFR 53.64 - Test procedure: Static fractionator test.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 6 2013-07-01 2013-07-01 false Test procedure: Static fractionator... Performance Characteristics of Class II Equivalent Methods for PM 2.5 § 53.64 Test procedure: Static... when reevaluating the curve as specified in the loading test. (2) Static chamber method....

  1. SAPHIRE Change Design and Testing Procedure

    SciTech Connect

    Curtis Smith

    2010-02-01

    This document describes the procedure software developers of SAPHIRE follow when adding a new feature or revising an existing capability. This procedure first describes the general approach to changes, and then describes more specific processes. The process stages include design and development, testing, and documentation.

  2. DOT-7A packaging test procedure

    SciTech Connect

    Kelly, D.L.

    1995-01-23

    This test procedure documents the steps involved with performance testing of Department of Transportation Specification 7A (DOT-7A) Type A packages. It includes description of the performance tests, the personnel involved, appropriate safety considerations, and the procedures to be followed while performing the tests. Westinghouse Hanford Company (WHC) is conducting the evaluation and testing discussed herein for the Department of Energy-Headquarters, Division of Quality Verification and Transportation Safety (EH-321). Please note that this report is not in WHC format. This report is being submitted through the Engineering Documentation System so that it may be used for reference and information purposes.

  3. Design and analysis of solder connections using accelerated approximate procedure with disturbed state concept

    NASA Astrophysics Data System (ADS)

    Whitenack, Russell

    The accelerated approximate procedure developed and used herein for analysis, design and parametric optimization in electronic packaging is based on the disturbed state concept (DSC) and the hierarchical single surface (HISS) constitutive models. Over the past many years the benefits of the DSC/HISS model, compared to those of available plasticity models, have been demonstrated and validated for a wide range of materials and solder connections. When the DSC/HISS model is implemented in a two-dimensional finite element code, it is well suited for failure analyses of lead/tin solder connections under cyclic thermal and mechanical loading that are typically occur in electronic packages. Unfortunately, an analysis of a single solder connection, for approximately 4000 or more cycles, can require much effort and computer time, which may be too long to be of practical use. The accelerated approximate procedure significantly reduces the effort and the analysis time to approximately 10 to 15 minutes on a Pentium 4, 3.2 GHz personal computer. The main emphasis of this dissertation is the use of the unified DSC model with the finite element procedure to predict the behavior of chip-substrate solder connections. The DSC code is used to validate the performance of a number of packages (144 BPGA, 313 PBGA) tested in the laboratory under thermomechanical loading. Using the accelerated approximate procedure, the effect of the variable thickness solder connection in a plane stress idealization is compared with that of the constant thickness assumption, and a three-dimensional analysis. It shows that the analysis with variable thickness (in plane stress idealization) yields improved results. The accelerated approximate procedure is then used to perform parametric design analyses of a solder connection by varying a number of important factors such as connection size, shape and misalignment. The effects of varying the DSC/HISS parameters on cycle life are also analyzed. The results of

  4. Advanced beamline design for Fermilab's Advanced Superconducting Test Accelerator

    NASA Astrophysics Data System (ADS)

    Prokop, Christopher R.

    The Advanced Superconducting Test Accelerator (ASTA) at Fermilab is a new electron accelerator currently in the commissioning stage. In addition to testing superconducting accelerating cavities for future accelerators, it is foreseen to support a variety of Advanced Accelerator R&D (AARD) experiments. Producing the required electron bunches with the expected flexibility is challenging. The goal of this dissertation is to explore via numerical simulations new accelerator beamlines that can enable the advanced manipulation of electron bunches. The work especially includes the design of a low-energy bunch compressor and a study of transverse-to-longitudinal phase space exchangers.

  5. Advanced Beamline Design for Fermilab's Advanced Superconducting Test Accelerator

    SciTech Connect

    Prokop, Christopher

    2014-01-01

    The Advanced Superconducting Test Accelerator (ASTA) at Fermilab is a new electron accelerator currently in the commissioning stage. In addition to testing superconducting accelerating cavities for future accelerators, it is foreseen to support a variety of Advanced Accelerator R&D (AARD) experiments. Producing the required electron bunches with the expected flexibility is challenging. The goal of this dissertation is to explore via numerical simulations new accelerator beamlines that can enable the advanced manipulation of electron bunches. The work especially includes the design of a low-energy bunch compressor and a study of transverse-to-longitudinal phase space exchangers.

  6. 40 CFR 91.507 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... engine performance characteristics and information from similar in-use engines. (c) Service accumulation... EMISSIONS FROM MARINE SPARK-IGNITION ENGINES Manufacturer Production Line Testing Program § 91.507 Test procedures. (a)(1) For marine SI engines subject to the provisions of this subpart, the prescribed test...

  7. 30 CFR 33.37 - Test procedure.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Test procedure. 33.37 Section 33.37 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS DUST COLLECTORS FOR USE IN CONNECTION WITH ROCK DRILLING IN COAL MINES Test Requirements...

  8. 30 CFR 33.37 - Test procedure.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Test procedure. 33.37 Section 33.37 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS DUST COLLECTORS FOR USE IN CONNECTION WITH ROCK DRILLING IN COAL MINES Test Requirements...

  9. 30 CFR 33.37 - Test procedure.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Test procedure. 33.37 Section 33.37 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS DUST COLLECTORS FOR USE IN CONNECTION WITH ROCK DRILLING IN COAL MINES Test Requirements...

  10. 30 CFR 33.37 - Test procedure.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Test procedure. 33.37 Section 33.37 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS DUST COLLECTORS FOR USE IN CONNECTION WITH ROCK DRILLING IN COAL MINES Test Requirements...

  11. 30 CFR 33.37 - Test procedure.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Test procedure. 33.37 Section 33.37 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS DUST COLLECTORS FOR USE IN CONNECTION WITH ROCK DRILLING IN COAL MINES Test Requirements...

  12. Thread-compound test procedures being developed

    SciTech Connect

    Wood, F.; Dairymple, D. ); McKown, K.; Matthews, B. )

    1990-09-10

    API is planning to issue a new bulletin that will outline standardization test procedures and set minimum performance for thread compounds used on OCTG (oil country tubular goods) connections with API thread forms. These performance standards will replace the recommended compound described in API Bulletin 5A2. This paper discusses how the proposed bulletin will detail test equipment, procedures, and performance requirements for thread compounds.

  13. YF-16 flight flutter test procedures

    NASA Technical Reports Server (NTRS)

    Brignac, W. J.; Ness, H. B.; Johnson, M. K.; Smith, L. M.

    1976-01-01

    The Random Decrement technique (Randomdec) was incorporated in procedures for flight testing of the YF-16 lightweight fighter prototype. Damping values obtained substantiate the adequacy of the flutter margin of safety. To confirm the structural modes which were being excited, a spectral analysis of each channel was performed using the AFFTC time/data 1923/50 time series analyzer. Inflight test procedure included the careful monitoring of strip charts, three axis pulses, rolls, and pullups.

  14. VMAT testing for an Elekta accelerator.

    PubMed

    Kaurin, Darryl Gl; Sweeney, Larry E; Marshall, Edward I; Mahendra, Saikanth

    2012-03-08

    Volumetric-modulated arc therapy (VMAT) has been shown to be able to deliver plans equivalent to intensity-modulated radiation therapy (IMRT) in a fraction of the treatment time. This improvement is important for patient immobilization/localization compliance due to comfort and treatment duration, as well as patient throughput. Previous authors have suggested commissioning methods for this modality. Here, we extend the methods reported for the Varian RapidArc system (which tested individual system components) to the Elekta linear accelerator, using custom files built using the Elekta iComCAT software. We also extend the method reported for VMAT commissioning of the Elekta accelerator by verifying maximum values of parameters (gantry speed, multileaf collimator (MLC) speed, and backup jaw speed), investigating: 1) beam profiles as a function of dose rate during an arc, 2) over/under dosing due to MLC reversals, and 3) over/under dosing at changing dose rate junctions. Equations for construction of the iComCAT files are given. Results indicate that the beam profile for lower dose rates varies less than 3% from that of the maximum dose rate, with no difference during an arc. The gantry, MLC, and backup jaw maximum speed are internally consistent. The monitor unit chamber is stable over the MUs and gantry movement conditions expected. MLC movement and position during VMAT delivery are within IMRT tolerances. Dose rate, gantry speed, and MLC speed are accurately controlled. Over/under dosing at junctions of MLC reversals or dose rate changes are within clinical acceptability.

  15. Guidelines for testing and release procedures

    NASA Technical Reports Server (NTRS)

    Molari, R.; Conway, M.

    1984-01-01

    Guidelines and procedures are recommended for the testing and release of the types of computer software efforts commonly performed at NASA/Ames Research Center. All recommendations are based on the premise that testing and release activities must be specifically selected for the environment, size, and purpose of each individual software project. Guidelines are presented for building a Test Plan and using formal Test Plan and Test Care Inspections on it. Frequent references are made to NASA/Ames Guidelines for Software Inspections. Guidelines are presented for selecting an Overall Test Approach and for each of the four main phases of testing: (1) Unit Testing of Components, (2) Integration Testing of Components, (3) System Integration Testing, and (4) Acceptance Testing. Tools used for testing are listed, including those available from operating systems used at Ames, specialized tools which can be developed, unit test drivers, stub module generators, and the use of format test reporting schemes.

  16. AZ-101 Mixer Pump Test Qualification Test Procedures (QTP)

    SciTech Connect

    THOMAS, W.K.

    2000-01-10

    Describes the Qualification test procedure for the AZ-101 Mixer Pump Data Acquisition System (DAS). The purpose of this Qualification Test Procedure (QTP) is to confirm that the AZ-101 Mixer Pump System has been properly programmed and hardware configured correctly. This QTP will test the software setpoints for the alarms and also check the wiring configuration from the SIMcart to the HMI. An Acceptance Test Procedure (ATP), similar to this QTP will be performed to test field devices and connections from the field.

  17. Preliminary tests of the electrostatic plasma accelerator

    NASA Technical Reports Server (NTRS)

    Aston, G.; Acker, T.

    1990-01-01

    This report describes the results of a program to verify an electrostatic plasma acceleration concept and to identify those parameters most important in optimizing an Electrostatic Plasma Accelerator (EPA) thruster based upon this thrust mechanism. Preliminary performance measurements of thrust, specific impulse and efficiency were obtained using a unique plasma exhaust momentum probe. Reliable EPA thruster operation was achieved using one power supply.

  18. Th Matching Paradigm: An Exact Test Procedure.

    ERIC Educational Resources Information Center

    Gillett, Raphael

    1985-01-01

    Provides a framework based on rook methodology for constructing exact unweighted tests in the matching paradigm. This paradigm tests whether a one-to-one pairing configuration between objects in two arrays contains more pairings of a particular kind than expected under the null hypothesis. The procedure is particularly useful for small samples.…

  19. 49 CFR 581.7 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) Longitudinal impact test procedures. (1) Impact the vehicle's front surface and its rear surface two times each... that it touches, but does not move, the test device, with the vehicle's longitudinal centerline... prior impact, unless the midpoint of the impact line with respect to the vehicle is to be more than...

  20. Laboratory Test of Newton's Second Law for Small Accelerations

    NASA Astrophysics Data System (ADS)

    Woodahl, Brian; Gundlach, Jens; Schlamminger, Stephan; Spitzer, Chris; Choi, Ki; Coy, Jennifer; Fischbach, Ephraim

    2007-05-01

    We have tested the proportionality of force and acceleration in Newton's second law, F=ma, in the limit of small forces and accelerations. Our tests reach well below the acceleration scales relevant to understanding several current astrophysical puzzles such as the flatness of galactic rotation curves, the Pioneer anomaly, and the Hubble acceleration. We find good agreement with Newton's second law at accelerations as small as 5 x 10-14 m/s^2. To cite this abstract, use the following reference: http://meetings.aps.org/link/BAPS.2007.OSS07.P1.15

  1. 40 CFR 90.120 - Certification procedure-use of special test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... test procedures. (a) Use of special test procedures by EPA. The Administrator may establish special... testing under the specified test procedures set forth in subpart E of this part. (b)(1) Use of alternate test procedures by an engine manufacturer. A manufacturer may elect to use an alternate test procedure...

  2. 46 CFR 160.072-5 - Accelerated weathering test.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 6 2011-10-01 2011-10-01 false Accelerated weathering test. 160.072-5 Section 160.072-5... weathering test. (a) Condition the flag, folded to 1/16th its size or as packaged, whichever is smaller, by... less than 24 hours. (d) The flag fails the accelerated weathering test if (1) After conditioning, the...

  3. 46 CFR 160.072-5 - Accelerated weathering test.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Accelerated weathering test. 160.072-5 Section 160.072-5... weathering test. (a) Condition the flag, folded to 1/16th its size or as packaged, whichever is smaller, by... less than 24 hours. (d) The flag fails the accelerated weathering test if (1) After conditioning, the...

  4. 46 CFR 160.072-5 - Accelerated weathering test.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 6 2014-10-01 2014-10-01 false Accelerated weathering test. 160.072-5 Section 160.072-5... weathering test. (a) Condition the flag, folded to 1/16th its size or as packaged, whichever is smaller, by... less than 24 hours. (d) The flag fails the accelerated weathering test if (1) After conditioning, the...

  5. 46 CFR 160.072-5 - Accelerated weathering test.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 6 2012-10-01 2012-10-01 false Accelerated weathering test. 160.072-5 Section 160.072-5... weathering test. (a) Condition the flag, folded to 1/16th its size or as packaged, whichever is smaller, by... less than 24 hours. (d) The flag fails the accelerated weathering test if (1) After conditioning, the...

  6. 46 CFR 160.072-5 - Accelerated weathering test.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 6 2013-10-01 2013-10-01 false Accelerated weathering test. 160.072-5 Section 160.072-5... weathering test. (a) Condition the flag, folded to 1/16th its size or as packaged, whichever is smaller, by... less than 24 hours. (d) The flag fails the accelerated weathering test if (1) After conditioning, the...

  7. Sequential accelerated tests: Improving the correlation of accelerated tests to module performance in the field

    NASA Astrophysics Data System (ADS)

    Felder, Thomas; Gambogi, William; Stika, Katherine; Yu, Bao-Ling; Bradley, Alex; Hu, Hongjie; Garreau-Iles, Lucie; Trout, T. John

    2016-09-01

    DuPont has been working steadily to develop accelerated backsheet tests that correlate with solar panels observations in the field. This report updates efforts in sequential testing. Single exposure tests are more commonly used and can be completed more quickly, and certain tests provide helpful predictions of certain backsheet failure modes. DuPont recommendations for single exposure tests are based on 25-year exposure levels for UV and humidity/temperature, and form a good basis for sequential test development. We recommend a sequential exposure of damp heat followed by UV then repetitions of thermal cycling and UVA. This sequence preserves 25-year exposure levels for humidity/temperature and UV, and correlates well with a large body of field observations. Measurements can be taken at intervals in the test, although the full test runs 10 months. A second, shorter sequential test based on damp heat and thermal cycling tests mechanical durability and correlates with loss of mechanical properties seen in the field. Ongoing work is directed toward shorter sequential tests that preserve good correlation to field data.

  8. Biomonitoring test procedures and biological criteria

    SciTech Connect

    Kszos, L.A.; Lipschultz, M.J.; Foster, W.E.

    1997-10-01

    The Water Environment Federation recently issued a special publication, Biomonitoring in the Water Environment. In this paper, the authors highlight the contents of the chapter 3, Biomonitoring Test Procedures, identify current trends in test procedures and introduce the concept of biological criteria (biocriteria). The book chapter (and this paper) focuses on freshwater and marine chronic and acute toxicity tests used in the National Pollutant Discharge Elimination System (NPDES) permits program to identify effluents and receiving waters containing toxic materials in acutely or chronically toxic concentrations. The two major categories of toxicity tests include acute tests and chronic tests. The USEPA chronic tests required in NPDEs permits have been shortened to 7 days by focusing on the most sensitive life-cycle stages; these tests are often referred to as short-term chronic tests. The type of test(s) required depend on NPDES permit requirements, objectives of the test, available resources, requirements of the test organisms, and effluent characteristics such as variability in flow or toxicity. The permit writer will determine the requirements for toxicity test(s) by considering such factors as dilution, effluent variability, and exposure variability. Whether the required test is acute or chronic, the objective of the test is to estimate the safe or no effect concentration which is defined as the concentration which will permit normal propagation of fish and other aquatic life in the receiving waters. In this paper, the authors review the types of toxicity tests, the commonly used test organisms, and the uses of toxicity test data. In addition, they briefly describe research on new methods and the use of biological criteria.

  9. Cone penetrometer moisture probe acceptance test procedure

    SciTech Connect

    Barnes, G.A.

    1996-01-01

    This report describes the procedure to be used for acceptance testing of the Cone Penetrometer Moisture Probe (CPMP) system. The system includes the probe and detectors, the winch system, the NIM bin electronics, the thermistor, the laptop computer, Input/Output (I/O) interfaces, LabVIEW` application with automatic scanning features and the calibration chamber. This Acceptance Test Procedure (ATP) will cover the function of all the components, and demonstrate data flow through the system, winch functions, and detector and temperature sensor sub- system functions in accordance with the Functional Design Criteria (FDC) specified in WHC-SD-WM-FDC-047.

  10. Testing of Composite Fan Vanes With Erosion-Resistant Coating Accelerated

    NASA Technical Reports Server (NTRS)

    Bowman, Cheryl L.; Sutter, James K.; Otten, Kim D.; Samorezov, Sergey; Perusek, Gail P.

    2004-01-01

    The high-cycle fatigue of composite stator vanes provided an accelerated life-state prior to insertion in a test stand engine. The accelerated testing was performed in the Structural Dynamics Laboratory at the NASA Glenn Research Center under the guidance of Structural Mechanics and Dynamics Branch personnel. Previous research on fixturing and test procedures developed at Glenn determined that engine vibratory conditions could be simulated for polymer matrix composite vanes by using the excitation of a combined slip table and electrodynamic shaker in Glenn's Structural Dynamics Laboratory. Bench-top testing gave researchers the confidence to test the coated vanes in a full-scale engine test.

  11. 40 CFR 91.119 - Certification procedure-use of special test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Standards and Certification Provisions § 91.119 Certification procedure—use of special test procedures. (a) Use of special test procedures by EPA. The Administrator may establish special test procedures for any... test procedures set forth in subpart E of this part. (b) Use of alternative test procedures by an...

  12. Synthetic Mooring Line Tensile Testing Procedure.

    DTIC Science & Technology

    1975-09-01

    tensile test procedure is necessary that will provide commonality among tensile tests of synthetic lines of all materials, diameters and lengths. A relationship was derived that relates material stiffness, diameter, and sample lengths to the strain rate during a tensile test . A first order experiment was conducted in which synthetic lines were tensile tested at various strain rates to determine to what degree tensile strength is affected by strain rate. Results show that the dispersion among individual data points overshadows the general trend of any

  13. 40 CFR 600.111-93 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 29 2010-07-01 2010-07-01 false Test procedures. 600.111-93 Section... Model Year Automobiles-Test Procedures § 600.111-93 Test procedures. (a) The test procedures to be... loss portion of the test procedure may be omitted unless specifically required by the Administrator...

  14. 40 CFR 600.111-80 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 29 2010-07-01 2010-07-01 false Test procedures. 600.111-80 Section... Model Year Automobiles-Test Procedures § 600.111-80 Test procedures. (a) The test procedures to be...-78 of this chapter, as applicable. (The evaporative and refueling loss portions of the test procedure...

  15. AREAL test facility for advanced accelerator and radiation source concepts

    NASA Astrophysics Data System (ADS)

    Tsakanov, V. M.; Amatuni, G. A.; Amirkhanyan, Z. G.; Aslyan, L. V.; Avagyan, V. Sh.; Danielyan, V. A.; Davtyan, H. D.; Dekhtiarov, V. S.; Gevorgyan, K. L.; Ghazaryan, N. G.; Grigoryan, B. A.; Grigoryan, A. H.; Hakobyan, L. S.; Haroutiunian, S. G.; Ivanyan, M. I.; Khachatryan, V. G.; Laziev, E. M.; Manukyan, P. S.; Margaryan, I. N.; Markosyan, T. M.; Martirosyan, N. V.; Mehrabyan, Sh. A.; Mkrtchyan, T. H.; Muradyan, L. Kh.; Nikogosyan, G. H.; Petrosyan, V. H.; Sahakyan, V. V.; Sargsyan, A. A.; Simonyan, A. S.; Toneyan, H. A.; Tsakanian, A. V.; Vardanyan, T. L.; Vardanyan, A. S.; Yeremyan, A. S.; Zakaryan, S. V.; Zanyan, G. S.

    2016-09-01

    Advanced Research Electron Accelerator Laboratory (AREAL) is a 50 MeV electron linear accelerator project with a laser driven RF gun being constructed at the CANDLE Synchrotron Research Institute. In addition to applications in life and materials sciences, the project aims as a test facility for advanced accelerator and radiation source concepts. In this paper, the AREAL RF photoinjector performance, the facility design considerations and its highlights in the fields of free electron laser, the study of new high frequency accelerating structures, the beam microbunching and wakefield acceleration concepts are presented.

  16. 40 CFR 90.707 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., but not limited to, the effect of the adjustment on engine performance characteristics and information... procedural error, test equipment problem, or engine performance problem that causes the engine to be unable... engine performance problem, the manufacturer must document in detail the nature of the problem and the...

  17. 40 CFR 90.707 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., but not limited to, the effect of the adjustment on engine performance characteristics and information... procedural error, test equipment problem, or engine performance problem that causes the engine to be unable... engine performance problem, the manufacturer must document in detail the nature of the problem and the...

  18. 40 CFR 90.707 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., but not limited to, the effect of the adjustment on engine performance characteristics and information... procedural error, test equipment problem, or engine performance problem that causes the engine to be unable... engine performance problem, the manufacturer must document in detail the nature of the problem and the...

  19. 49 CFR 399.209 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 5 2013-10-01 2013-10-01 false Test procedures. 399.209 Section 399.209 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL MOTOR CARRIER SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION FEDERAL MOTOR CARRIER SAFETY REGULATIONS EMPLOYEE SAFETY AND HEALTH STANDARDS Step, Handhold, and Deck...

  20. Test Security Procedures for Nevada Proficiency Examinations.

    ERIC Educational Resources Information Center

    Nevada State Dept. of Education, Carson City.

    Nevada statutes and administrative regulations specifically prohibit the disclosure of the content of examinations used in the Nevada Proficiency Examination Program. This document focuses on procedures to insure examination security. The state's test security requirements are outlined. Other sections deal with access to and copying of examination…

  1. 75 FR 34653 - Engine-Testing Procedures

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-18

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 1065 Engine-Testing Procedures CFR Correction In Title 40 of the Code of Federal Regulations, Part 1000 to End, revised as of July 1, 2009, on page 587, in Sec. 1065.340, reinstate paragraph...

  2. 10 CFR 431.154 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 3 2012-01-01 2012-01-01 false Test procedures. 431.154 Section 431.154 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY PROGRAM FOR CERTAIN COMMERCIAL AND INDUSTRIAL... commercial clothes washers. Energy Conservation Standards...

  3. 10 CFR 431.154 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 3 2013-01-01 2013-01-01 false Test procedures. 431.154 Section 431.154 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY PROGRAM FOR CERTAIN COMMERCIAL AND INDUSTRIAL... commercial clothes washers. Energy Conservation Standards...

  4. 10 CFR 431.154 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Test procedures. 431.154 Section 431.154 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY PROGRAM FOR CERTAIN COMMERCIAL AND INDUSTRIAL... commercial clothes washers. Energy Conservation Standards...

  5. 10 CFR 431.154 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 3 2014-01-01 2014-01-01 false Test procedures. 431.154 Section 431.154 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY PROGRAM FOR CERTAIN COMMERCIAL AND INDUSTRIAL... commercial clothes washers. Energy Conservation Standards...

  6. Infant test/procedure preparation (image)

    MedlinePlus

    During any infant test or procedure a child will be more comforted if a parent is able to be present, although the child will probably still show anxiety and cry. A child may also find comfort in a favorite toy or blanket.

  7. The Cloze Procedure as a Reading Test.

    ERIC Educational Resources Information Center

    Sadden, Leah Jane; Reid, Janet

    1985-01-01

    Reports on a study of the use of cloze passages in a developmental reading assessment program. The cloze procedure provides students with opportunities to practice their improved reading skills, while affording complete student-as-reader profiles. Concedes the value of standardized tests in determining student readiness to exit developmental…

  8. 40 CFR 90.707 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF... procedural error, test equipment problem, or engine performance problem that causes the engine to be unable... engine performance problem, the manufacturer must document in detail the nature of the problem and the...

  9. Test Operations Procedure (TOP) 5-2-521 Pyrotechnic Shock Test Procedures

    DTIC Science & Technology

    2007-11-20

    Resonant Fixtures Missile Ordnance Pyroshock Shock Response Spectrum Flight Safety Components 16. SECURITY CLASSIFICATION OF: B. ABSTRACT...is to establish guidelines and procedures such that pyrotechnic shock (hereafter known as pyroshock ) testing can be performed in a uniform manner and... pyroshock testing. 1.3 Limitations. a. This TOP can only provide an overview of far field pyroshock testing procedures. Specific test items and or

  10. Honeywell Modular Automation System Acceptance Test Procedure

    SciTech Connect

    STUBBS, A.M.

    1999-09-21

    The purpose of this Acceptance Test Procedure (ATP) is to verify the operability of the three new furnaces as controlled by the new Honeywell Modular Automation System (MAS). The Honeywell MAS is being installed in PFP to control the three thermal stabilization furnaces in glovebox HA-211. The ATP provides instructions for testing the configuration of the Honeywell MAS at the Plutonium Finishing Plant(PFP). The test will be a field test of the analog inputs, analog outputs, and software interlocks. The interlock test will check the digital input and outputs. Field equipment will not be connected forth is test. Simulated signals will be used to test thermocouple, limit switch, and vacuum pump inputs to the PLUMAS.

  11. 17 CFR 10.114 - Acceleration of establishment of restitution procedure.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 17 Commodity and Securities Exchanges 1 2013-04-01 2013-04-01 false Acceleration of establishment of restitution procedure. 10.114 Section 10.114 Commodity and Securities Exchanges COMMODITY FUTURES TRADING COMMISSION RULES OF PRACTICE Restitution Orders § 10.114 Acceleration of establishment...

  12. 17 CFR 10.114 - Acceleration of establishment of restitution procedure.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 17 Commodity and Securities Exchanges 1 2010-04-01 2010-04-01 false Acceleration of establishment of restitution procedure. 10.114 Section 10.114 Commodity and Securities Exchanges COMMODITY FUTURES TRADING COMMISSION RULES OF PRACTICE Restitution Orders § 10.114 Acceleration of establishment...

  13. 17 CFR 10.114 - Acceleration of establishment of restitution procedure.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 17 Commodity and Securities Exchanges 1 2012-04-01 2012-04-01 false Acceleration of establishment of restitution procedure. 10.114 Section 10.114 Commodity and Securities Exchanges COMMODITY FUTURES TRADING COMMISSION RULES OF PRACTICE Restitution Orders § 10.114 Acceleration of establishment...

  14. 17 CFR 10.114 - Acceleration of establishment of restitution procedure.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 17 Commodity and Securities Exchanges 1 2014-04-01 2014-04-01 false Acceleration of establishment of restitution procedure. 10.114 Section 10.114 Commodity and Securities Exchanges COMMODITY FUTURES TRADING COMMISSION RULES OF PRACTICE Restitution Orders § 10.114 Acceleration of establishment...

  15. 17 CFR 10.114 - Acceleration of establishment of restitution procedure.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 17 Commodity and Securities Exchanges 1 2011-04-01 2011-04-01 false Acceleration of establishment of restitution procedure. 10.114 Section 10.114 Commodity and Securities Exchanges COMMODITY FUTURES TRADING COMMISSION RULES OF PRACTICE Restitution Orders § 10.114 Acceleration of establishment...

  16. Accelerated life testing effects on CMOS microcircuit characteristics

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The 250 C, 200C and 125C accelerated tests are described. The wear-out distributions from the 250 and 200 C tests were used to estimate the activation energy between the two test temperatures. The duration of the 125 C test was not sufficient to bring the test devices into the wear-out region. It was estimated that, for the most complex of the three devices types, the activation energy between 200 C and 125 C should be at least as high as that between 250 C and 200 C. The practicality of the use of high temperature for the accelerated life tests from the point of view of durability of equipment is assessed. Guidlines for the development of accelerated life-test conditions are proposed. The use of the silicon nitride overcoat to improve the high temperature accelerated life-test characteristics of CMOS microcircuits is described.

  17. Terrestrial Photovoltaic Module Accelerated Test-To-Failure Protocol

    SciTech Connect

    Osterwald, C. R.

    2008-03-01

    This technical report documents a test-to-failure protocol that may be used to obtain quantitative information about the reliability of photovoltaic modules using accelerated testing in environmental temperature-humidity chambers.

  18. Sources of Error in Accelerated Stability Test Methods for Diesel Fuels.

    DTIC Science & Technology

    1985-06-01

    designated by other au- *- thorized documents. Trade names cited in this report do not constitute an official endorsement or approval of the use of such...including ASTM D 2274) used to determine the accelerated oxidation sta- bility of middle distillate fuels were reviewed. A critique of various...aging, and post-aging procedures on test results using a small set of test fuels. . Changes in the particulate filtration procedure and adherent

  19. Accelerated Test Method for Corrosion Protective Coatings Project

    NASA Technical Reports Server (NTRS)

    Falker, John; Zeitlin, Nancy; Calle, Luz

    2015-01-01

    This project seeks to develop a new accelerated corrosion test method that predicts the long-term corrosion protection performance of spaceport structure coatings as accurately and reliably as current long-term atmospheric exposure tests. This new accelerated test method will shorten the time needed to evaluate the corrosion protection performance of coatings for NASA's critical ground support structures. Lifetime prediction for spaceport structure coatings has a 5-year qualification cycle using atmospheric exposure. Current accelerated corrosion tests often provide false positives and negatives for coating performance, do not correlate to atmospheric corrosion exposure results, and do not correlate with atmospheric exposure timescales for lifetime prediction.

  20. 16 CFR 1512.18 - Tests and test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... other suitable device for measuring the specified forces on the handbrake levers and a dry, clean, level... performed and no adjustments shall be made between these tests. (i) Loading test procedure. The hand levers... lever. If the hand lever contacts the handlebar (bottoms) before a force of 445 N (100 lbf) is reached...

  1. Test of F=ma for small accelerations

    NASA Astrophysics Data System (ADS)

    Schlamminger, Stephan; Spitzer, Chris; Choi, Ki-Young; Gundlach, Jens; Woodahl, Brian; Coy, Jennifer; Fischbach, Ephraim

    2007-04-01

    We have used a torsion balance to test Newton's second law in the limit of small forces and accelerations. We were able to verify the proportionality between force and acceleration down to accelerations of 5 x10-14; m/s^2. This is approximately three orders of magnitude lower than a previous measurement and provides a stringent constraint on theories involving a modification of Newtonian dynamics to explain the flatness of galactic rotation curves.

  2. Testing general relativity with laser accelerated electron beams

    SciTech Connect

    Gergely, L. A.; Harko, T.

    2012-07-09

    Electron accelerations of the order of 10{sup 21} g obtained by laser fields open up the possibility of experimentally testing one of the cornerstones of general relativity, the weak equivalence principle, which states that the local effects of a gravitational field are indistinguishable from those sensed by a properly accelerated observer in flat space-time. We illustrate how this can be done by solving the Einstein equations in vacuum and integrating the geodesic equations of motion for a uniformly accelerated particle.

  3. Development of Accelerated Fuel-Engine Qualification Procedures.

    DTIC Science & Technology

    1983-09-01

    problems. In addition to bench tests covering these properties, a Component Endurance Test Facility (CETF) has been V. 2 . designed, fabricated and...Valtierra, and J.L. Jungman for their efforts in the design, fabrication and operation of the Component Endurance Test Facility (CETF) described herein...presented in Table 8. An MDF * of 3.926 (4 degrees of freedom, 95 percent confidence level) was used, since all elastomer tests employed five replicate O

  4. Timescale Correlation between Marine Atmospheric Exposure and Accelerated Corrosion Testing

    NASA Technical Reports Server (NTRS)

    Montgomery, Eliza L.; Calle, Luz Marina; Curran, Jerone C.; Kolody, Mark R.

    2011-01-01

    Evaluation of metal-based structures has long relied on atmospheric exposure test sites to determine corrosion resistance in marine environments. Traditional accelerated corrosion testing relies on mimicking the exposure conditions, often incorporating salt spray and ultraviolet (UV) radiation, and exposing the metal to continuous or cyclic conditions of the corrosive environment. Their success for correlation to atmospheric exposure is often a concern when determining the timescale to which the accelerated tests can be related. Accelerated laboratory testing, which often focuses on the electrochemical reactions that occur during corrosion conditions, has yet to be universally accepted as a useful tool in predicting the long term service life of a metal despite its ability to rapidly induce corrosion. Although visual and mass loss methods of evaluating corrosion are the standard and their use is imperative, a method that correlates timescales from atmospheric exposure to accelerated testing would be very valuable. This work uses surface chemistry to interpret the chemical changes occurring on low carbon steel during atmospheric and accelerated corrosion conditions with the objective of finding a correlation between its accelerated and long-term corrosion performance. The current results of correlating data from marine atmospheric exposure conditions at the Kennedy Space Center beachside corrosion test site, alternating seawater spray, and immersion in typical electrochemical laboratory conditions, will be presented. Key words: atmospheric exposure, accelerated corrosion testing, alternating seawater spray, marine, correlation, seawater, carbon steel, long-term corrosion performance prediction, X-ray photoelectron spectroscopy.

  5. 39 CFR 955.13 - Optional Small Claims (Expedited) and Accelerated Procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Optional Small Claims (Expedited) and Accelerated Procedures. 955.13 Section 955.13 Postal Service UNITED STATES POSTAL SERVICE PROCEDURES RULES OF PRACTICE BEFORE THE POSTAL SERVICE BOARD OF CONTRACT APPEALS § 955.13 Optional Small Claims (Expedited) and...

  6. 40 CFR 94.207 - Special test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... satisfactory testing under the specified test procedures set forth in Subpart B of this part. (b) Use of alternate test procedures by a manufacturer. (1) A manufacturer may elect to use an alternate test procedure... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Special test procedures. 94.207...

  7. Rough handling tests. Final report on International Test Operations Procedure

    SciTech Connect

    Not Available

    1985-12-13

    This document provides test procedures to simulate the transportation of items carried as unsecured cargo in trucks, or on the person of Army personnel. Items include munitions, rifles, rockets, radios, and mortars. Vibration testing, airdrop capability, and airdrop capability of explosives are not covered in this ITOP. This ITOP provides guidance for testing the ability of military items to withstand the shocks encountered during transportation to or employment on the battlefield.

  8. The Accelerator Test Facility at Brookhaven: Main capabilities

    NASA Astrophysics Data System (ADS)

    Yakimenko, Vitaly

    2004-12-01

    Brookhaven National Laboratory's (BNL's) Accelerator Test Facility (ATF) is a user facility for accelerator- and beam- physics. Researchers from national and foreign universities, the DOE's national laboratories, and small businesses can carry out their experiments here, thereby relieving their institutions and companies from the large investment in accelerators, lasers, control and diagnostic equipment, and trained accelerator operators, all of which BNL's ATF offers. The main emphasis of this paper is on the capabilities of the ATF that I illustrate by discussing a few experiments. More detailed information can be obtained from the ATF web site: http://www.bnl.gov/atf.

  9. Miniature penetrator (MinPen) acceleration recorder development test

    SciTech Connect

    Franco, R.J.; Platzbecker, M.R.

    1998-08-01

    The Telemetry Technology Development Department at Sandia National Laboratories actively develops and tests acceleration recorders for penetrating weapons. This new acceleration recorder (MinPen) utilizes a microprocessor-based architecture for operational flexibility while maintaining electronics and packaging techniques developed over years of penetrator testing. MinPen has been demonstrated to function in shock environments up to 20,000 Gs. The MinPen instrumentation development has resulted in a rugged, versatile, miniature acceleration recorder and is a valuable tool for penetrator testing in a wide range of applications.

  10. 118-B-1 excavation treatability test procedures

    SciTech Connect

    Frain, J.M.

    1994-08-01

    This treatability study has two purposes: to support development of the approach to be used for burial ground remediation, and to provide specific engineering information for the design of burial grounds receiving waste generated from the 100 Area removal actions. Data generated from this test will also provide performance and cost information necessary for detailed analysis of alternatives for burial ground remediation. Further details on the test requirements, milestones and data quality objectives are described in detail in the 118-B-1 Excavation Treatability Test Plan (DOE/RL-94-43). These working procedures are intended for use by field personnel to implement the requirements of the milestone. A copy of the detailed Test Plan will be kept on file at the on-site field support trailer, and will be available for review by field personnel.

  11. Ultrasonic interface level analyzer shop test procedure

    SciTech Connect

    STAEHR, T.W.

    1999-05-24

    The Royce Instrument Corporation Model 2511 Interface Level Analyzer (URSILLA) system uses an ultrasonic ranging technique (SONAR) to measure sludge depths in holding tanks. Three URSILLA instrument assemblies provided by the W-151 project are planned to be used during mixer pump testing to provide data for determining sludge mobilization effectiveness of the mixer pumps and sludge settling rates. The purpose of this test is to provide a documented means of verifying that the functional components of the three URSILLA instruments operate properly. Successful completion of this Shop Test Procedure (STP) is a prerequisite for installation in the AZ-101 tank. The objective of the test is to verify the operation of the URSILLA instruments and to verify data collection using a stand alone software program.

  12. Reliability Testing Procedure for MEMS IMUs Applied to Vibrating Environments

    PubMed Central

    De Pasquale, Giorgio; Somà, Aurelio

    2010-01-01

    The diffusion of micro electro-mechanical systems (MEMS) technology applied to navigation systems is rapidly increasing, but currently, there is a lack of knowledge about the reliability of this typology of devices, representing a serious limitation to their use in aerospace vehicles and other fields with medium and high requirements. In this paper, a reliability testing procedure for inertial sensors and inertial measurement units (IMU) based on MEMS for applications in vibrating environments is presented. The sensing performances were evaluated in terms of signal accuracy, systematic errors, and accidental errors; the actual working conditions were simulated by means of an accelerated dynamic excitation. A commercial MEMS-based IMU was analyzed to validate the proposed procedure. The main weaknesses of the system have been localized by providing important information about the relationship between the reliability levels of the system and individual components. PMID:22315550

  13. Acceleration of fatigue tests for built-up titanium components

    NASA Technical Reports Server (NTRS)

    Watanabe, R. T.

    1976-01-01

    A study was made of the feasibility of a room-temperature scheme of accelerating fatigue tests for Mach 3 advanced supersonic transport aircraft. The test scheme used equivalent room-temperature cycles calculated for supersonic flight conditions. Verification tests were conducted using specimens representing titanium wing lower surface structure. Test-acceleration parameters were developed for the test with an auxiliary test set. Five specimens were tested with a flight-by-flight load and temperature spectrum to simulate typical Mach 3 operation. Two additional sets of five specimens were tested at room temperature to evaluate the test-acceleration scheme. The fatigue behavior of the specimens generally correlated well with the proposed correction method.

  14. Sequential and combined acceleration tests for crystalline Si photovoltaic modules

    NASA Astrophysics Data System (ADS)

    Masuda, Atsushi; Yamamoto, Chizuko; Uchiyama, Naomi; Ueno, Kiyoshi; Yamazaki, Toshiharu; Mitsuhashi, Kazunari; Tsutsumida, Akihiro; Watanabe, Jyunichi; Shirataki, Jyunko; Matsuda, Keiko

    2016-04-01

    The sequential combination test for photovoltaic modules is effective for accelerating degradation to shorten the test time and for reproducing degradation phenomena observed in modules exposed outdoors for a long time. The damp-heat (DH) test, thermal-cycle (TC) test, humidity-freeze (HF) test or dynamic mechanical load (DML) test is combined for the test modules. It was confirmed that chemical corrosion degradation or physical mechanical degradation is reproduced by the combination of the above tests. Cracks on the back sheet and delamination, often observed upon outdoor exposure, were well reproduced by the combination of DH and TC tests and TC and HF tests, respectively. Sequential DH and TC tests and DML and TC tests accelerated the degradation. These sequential tests are expected to be effective in reducing the required time of indoor testing for ensuring long-term reliability.

  15. Advanced Test Accelerator (ATA) pulse power technology development

    SciTech Connect

    Reginato, L.L.; Branum, D.; Cook, E.

    1981-03-09

    The Advanced Test Accelerator (ATA) is a pulsed linear induction accelerator with the following design parameters: 50 MeV, 10 kA, 70 ns, and 1 kHz in a ten-pulse burst. Acceleration is accomplished by means of 190 ferrite-loaded cells, each capable of maintaining a 250 kV voltage pulse for 70 ns across a 1-inch gap. The unique characteristic of this machine is its 1 kHz burst mode capability at very high currents. This paper dscribes the pulse power development program which used the Experimental Test Accelerator (ETA) technology as a starting base. Considerable changes have been made both electrically and mechanically in the pulse power components with special consideration being given to the design to achieve higher reliability. A prototype module which incorporates all the pulse power components has been built and tested for millions of shots. Prototype components and test results are described.

  16. 40 CFR 90.411 - Post-test analyzer procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 21 2013-07-01 2013-07-01 false Post-test analyzer procedures. 90.411... Test Procedures § 90.411 Post-test analyzer procedures. (a) Perform a HC hang-up check within 60 seconds of the completion of the last mode in the test. Use the following procedure: (1) Introduce a zero...

  17. 40 CFR 86.884-5 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 19 2014-07-01 2014-07-01 false Test procedures. 86.884-5 Section 86... Heavy-Duty Engines; Smoke Exhaust Test Procedure § 86.884-5 Test procedures. The procedures described in this and subsequent sections will be the test program to determine the conformity of engines with...

  18. 40 CFR 86.884-5 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 20 2012-07-01 2012-07-01 false Test procedures. 86.884-5 Section 86... New Diesel Heavy-Duty Engines; Smoke Exhaust Test Procedure § 86.884-5 Test procedures. The procedures described in this and subsequent sections will be the test program to determine the conformity of...

  19. 40 CFR 86.608-98 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 19 2014-07-01 2014-07-01 false Test procedures. 86.608-98 Section 86... New Light-Duty Vehicles, Light-Duty Trucks, and Heavy-Duty Vehicles § 86.608-98 Test procedures. (a) The prescribed test procedures are the Federal Test Procedure, as described in subpart B of this...

  20. 40 CFR 86.608-98 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 20 2012-07-01 2012-07-01 false Test procedures. 86.608-98 Section 86... Auditing of New Light-Duty Vehicles, Light-Duty Trucks, and Heavy-Duty Vehicles § 86.608-98 Test procedures. (a) The prescribed test procedures are the Federal Test Procedure, as described in subpart B...

  1. Test Operations Procedure (TOP) 06-2-301 Wind Testing

    DTIC Science & Technology

    2017-06-14

    TYPE Final 3. DATES COVERED (From - To) 4. TITLE AND SUBTITLE Test Operations Procedure (TOP) 06-2-301 Wind Testing 5a. CONTRACT NUMBER 5b...ORGANIZATION NAME(S) AND ADDRESS(ES) U.S. Army Redstone Test Center Building 4500 Martin Road Redstone Arsenal, AL 36898 8. PERFORMING ORGANIZATION...REPORT NUMBER TOP 06-2-301 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) U.S. Army Test and Evaluation Command CSTE-TM (Policy

  2. Cosmological consistency tests of gravity theory and cosmic acceleration

    NASA Astrophysics Data System (ADS)

    Ishak-Boushaki, Mustapha B.

    2017-01-01

    Testing general relativity at cosmological scales and probing the cause of cosmic acceleration are among the important objectives targeted by incoming and future astronomical surveys and experiments. I present our recent results on consistency tests that can provide insights about the underlying gravity theory and cosmic acceleration using cosmological data sets. We use statistical measures, the rate of cosmic expansion, the growth rate of large scale structure, and the physical consistency of these probes with one another.

  3. Test particle acceleration in turbulent reconnecting magnetic fields

    NASA Technical Reports Server (NTRS)

    Ambrosiano, John; Matthaeus, William H.; Goldstein, Melvyn L.; Plante, Daniel

    1988-01-01

    The effect of turbulence on particle acceleration in a MHD field was investigated by computing test particle trajectories in turbulent MHD reconnecting fields, including reconnection simulations at different magnetic Reynolds numbers. The dynamics of individual particles were investigated making it possible to examine the acceleration mechanism in great detail. It was found that turbulence influences the acceleration in two ways. It enhances the reconnection electric field while producing a stochastic electric field that gives rise to momentum diffusion; and it produces magnetic 'bubbles' and other irregularities that can temporarily trap test particles in the strong reconnection electric field for times comparable to the magnetofluid characteristic time.

  4. Test particle acceleration in turbulent reconnecting magnetic fields

    NASA Technical Reports Server (NTRS)

    Ambrosiano, John; Matthaeus, William H.; Goldstein, Melvyn L.; Plante, Daniel

    1988-01-01

    The effect of turbulence on particle acceleration in a MHD field was investigated by computing test particle trajectories in turbulent MHD reconnecting fields, including reconnection simulations at different magnetic Reynolds numbers. The dynamics of individual particles were investigated making it possible to examine the acceleration mechanism in great detail. It was found that turbulence influences the acceleration in two ways. It enhances the reconnection electric field while producing a stochastic electric field that gives rise to momentum diffusion; and it produces magnetic 'bubbles' and other irregularities that can temporarily trap test particles in the strong reconnection electric field for times comparable to the magnetofluid characteristic time.

  5. Test Procedures for Toll Call Certification Alternatives.

    DTIC Science & Technology

    1987-04-07

    REPORT 4 PERIOD COVERED (U) Test Procedures for Toll CallFia Se86-Ar7 Certification AlternativesFiaSe86-Ar7 6. PERFORMING ORG . REPORT NUMBER 1. AUTHOR(e...toll call sampling is to use the toll call 21 a a C3a En L~a cmaL-a Lna ac C3 a cc u _3 to a- aa aL 4r C14 I Lo a_ V ’ Iara a D r- w U 4 c * a I’ aDUJ

  6. High gradient tests of metallic mm-wave accelerating structures

    NASA Astrophysics Data System (ADS)

    Dal Forno, Massimo; Dolgashev, Valery; Bowden, Gordon; Clarke, Christine; Hogan, Mark; McCormick, Doug; Novokhatski, Alexander; O'Shea, Brendan; Spataro, Bruno; Weathersby, Stephen; Tantawi, Sami G.

    2017-08-01

    This paper explores the physics of vacuum rf breakdowns in high gradient mm-wave accelerating structures. We performed a series of experiments with 100 GHz and 200 GHz metallic accelerating structures, at the Facility for Advanced Accelerator Experimental Tests (FACET) at the SLAC National Accelerator Laboratory. This paper presents the experimental results of rf tests of 100 GHz travelling-wave accelerating structures, made of hard copper-silver alloy. The results are compared with pure hard copper structures. The rf fields were excited by the FACET ultra-relativistic electron beam. The accelerating structures have open geometries, 10 cm long, composed of two halves separated by a variable gap. The rf frequency of the fundamental accelerating mode depends on the gap size and can be changed from 90 GHz to 140 GHz. The measured frequency and pulse length are consistent with our simulations. When the beam travels off-axis, a deflecting field is induced in addition to the decelerating longitudinal field. We measured the deflecting forces by observing the displacement of the electron bunch and used this measurement to verify the expected accelerating gradient. We present the first quantitative measurement of rf breakdown rates in 100 GHz copper-silver accelerating structure, which was 10-3 per pulse, with peak electric field of 0.42 GV/m, an accelerating gradient of 127 MV/m, at a pulse length of 2.3 ns. The goal of our studies is to understand the physics of gradient limitations in order to increase the energy reach of future accelerators.

  7. High gradient tests of metallic mm-wave accelerating structures

    DOE PAGES

    Dal Forno, Massimo; Dolgashev, Valery; Bowden, Gordon; ...

    2017-05-10

    This study explores the physics of vacuum rf breakdowns in high gradient mm-wave accelerating structures. We performed a series of experiments with 100 GHz and 200 GHz metallic accelerating structures, at the Facility for Advanced Accelerator Experimental Tests (FACET) at the SLAC National Accelerator Laboratory. This paper presents the experimental results of rf tests of 100 GHz travelling-wave accelerating structures, made of hard copper-silver alloy. The results are compared with pure hard copper structures. The rf fields were excited by the FACET ultra-relativistic electron beam. The accelerating structures have open geometries, 10 cm long, composed of two halves separated bymore » a variable gap. The rf frequency of the fundamental accelerating mode depends on the gap size and can be changed from 90 GHz to 140 GHz. The measured frequency and pulse length are consistent with our simulations. When the beam travels off-axis, a deflecting field is induced in addition to the decelerating longitudinal field. We measured the deflecting forces by observing the displacement of the electron bunch and used this measurement to verify the expected accelerating gradient. We present the first quantitative measurement of rf breakdown rates in 100 GHz copper-silver accelerating structure, which was 10–3 per pulse, with peak electric field of 0.42 GV/m, an accelerating gradient of 127 MV/m, at a pulse length of 2.3 ns. The goal of our studies is to understand the physics of gradient limitations in order to increase the energy reach of future accelerators.« less

  8. HIGH POWER BEAM DUMP AND TARGET / ACCELERATOR INTERFACE PROCEDURES

    SciTech Connect

    Blokland, Willem; Plum, Michael A; Peters, Charles C; Brown, David L; Galambos, John D

    2013-01-01

    Satisfying operational procedures and limits for the beam target interface is a critical concern for high power operation at spallation neutron sources. At the Oak Ridge Spallation Neutron Source (SNS) a number of protective measures are instituted to ensure that the beam position, beam size and peak intensity are within acceptable limits at the target and high power Ring Injection Dump (RID). The high power beam dump typically handles up to 50 100 kW of beam power and its setup is complicated by the fact that there are two separate beam components simultaneously directed to the dump. The beam on target is typically in the 800-1000 kW average power level, delivered in sub- s 60 Hz pulses. Setup techniques using beam measurements to quantify the beam parameters at the target and dump will be described. However, not all the instrumentation used for the setup and initial qualification is available during high power operation. Additional techniques are used to monitor the beam during high power operation to ensure the setup conditions are maintained, and these are also described.

  9. Accelerator Tests of the KLEM Prototypes

    NASA Technical Reports Server (NTRS)

    Bashindzhagyan, G.; Adams, J. H.; Bashindzhagyan, P.; Baranova, N.; Christl, M.; Chilingarian, A.; Chupin, I.; Derrickson, J.; Drury, L.; Egorov, N.

    2003-01-01

    The Kinematic Lightweight Energy Meter (KLEM) device is planned for direct measurement of the elemental energy spectra of high-energy (10(exp 11)-10(exp 16) eV) cosmic rays. The first KLEM prototype has been tested at CERN with 180 GeV pion beam in 2001. A modified KLEM prototype will be tested in proton and heavy ion beams to give more experimental data on energy resolution and charge resolution with KLEM method. The first test results are presented and compared with simulations.

  10. Accelerated Reliability Testing Utilizing Design of Experiments

    DTIC Science & Technology

    1993-12-01

    hat to Measure ............................... 23 b. Identify Stresses ................................ 24 c . Stress Levels...36 c . Test Time ................................... 48 d. Trade Off Analysis .............................. 56 3. A nalysis...79 2. Exam ple 2 . ..................................... 92 3. Exam ple 3 . .................................... 102 C . Conclusion

  11. INERT Atmosphere confinement operability test procedure

    SciTech Connect

    RISENMAY, H.R.

    1999-02-22

    This Operability Test Procedure (OTP) provides instructions for testing operability of the Inert Atmosphere Confinement (IAC). The Inert Atmosphere Confinement was designed and built for opening cans of metal items that might have hydrided surfaces. Unreviewed Safety Question (USQ) PFP-97-005 addresses the discovery of suspected plutonium hydride forming on plutonium metal currently stored in the Plutonium Finishing Plant vaults. Plutonium hydride reacts quickly with air, liberating energy. The Inert Atmosphere Confinement was designed to prevent this sudden liberation of energy by opening the material in an inert argon atmosphere instead of the normal glovebox atmosphere. The IAC is located in glovebox HC-21A, room 230B of the 234-5Z Building at the Plutonium Finishing Plant (PFP) in the 200-West Area of the Hanford Site.

  12. An accelerated procedure for recursive feature ranking on microarray data.

    PubMed

    Furlanello, C; Serafini, M; Merler, S; Jurman, G

    2003-01-01

    We describe a new wrapper algorithm for fast feature ranking in classification problems. The Entropy-based Recursive Feature Elimination (E-RFE) method eliminates chunks of uninteresting features according to the entropy of the weights distribution of a SVM classifier. With specific regard to DNA microarray datasets, the method is designed to support computationally intensive model selection in classification problems in which the number of features is much larger than the number of samples. We test E-RFE on synthetic and real data sets, comparing it with other SVM-based methods. The speed-up obtained with E-RFE supports predictive modeling on high dimensional microarray data.

  13. Accelerated life testing effects on CMOS microcircuit characteristics

    NASA Technical Reports Server (NTRS)

    1977-01-01

    Accelerated life tests were performed on CMOS microcircuits to predict their long term reliability. The consistency of the CMOS microcircuit activation energy between the range of 125 C to 200 C and the range 200 C to 250 C was determined. Results indicate CMOS complexity and the amount of moisture detected inside the devices after testing influences time to failure of tested CMOS devices.

  14. Accelerated life testing effects on CMOS microcircuit characteristics

    NASA Technical Reports Server (NTRS)

    1980-01-01

    This report covers the time period from May 1976 to December 1979 and encompasses the three phases of accelerated testing: Phase 1, the 250 C testing; Phase 2, the 200 C testing; and Phase 3, the 125 C testing. The duration of the test in Phase 1 and Phase 2 was sufficient to take the devices into the wear out region. The wear out distributions were used to estimate the activation energy between the 250 C and the 200 C test temperatures. The duration of the 125 C test, 20,000 hours, was not sufficient to bring the test devices into the wear out region; consequently the third data point at 125 C for determining the consistency of activation energy could not be obtained. It was estimated that, for the most complex of the three device types, the activation energy between 200 C and 125 C should be at least as high as that between 250 C and 200 C. The practicality of the use of high temperature for the accelerated life tests from the point of view of durability of equipment was assessed. Guidelines for the development of accelerated life test conditions were proposed. The use of the silicon nitride overcoat to improve the high temperature accelerated life test characteristics of CMOS microcircuits was explored in Phase 4 of this study and is attached as an appendix to this report.

  15. 40 CFR 136.4 - Application for alternate test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... within such State. (c) Unless and until printed application forms are made available, an application for... alternate testing procedure is being requested. (3) Provide justification for using testing procedures other... procedure to the effluents in question. (d) An application for approval of an alternate test procedure for...

  16. 40 CFR 86.1527 - Idle test procedure; overview.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 19 2010-07-01 2010-07-01 false Idle test procedure; overview. 86.1527 Section 86.1527 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Procedures § 86.1527 Idle test procedure; overview. (a) The idle emission test procedure is designed to...

  17. 40 CFR 90.408 - Pre-test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 20 2011-07-01 2011-07-01 false Pre-test procedures. 90.408 Section 90... Procedures § 90.408 Pre-test procedures. (a) Engine service accumulation and stabilization procedure. Use the... during service accumulation is allowed only in accordance with § 90.118. (b) Engine pre-test...

  18. 40 CFR 90.408 - Pre-test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 21 2012-07-01 2012-07-01 false Pre-test procedures. 90.408 Section 90... Procedures § 90.408 Pre-test procedures. (a) Engine service accumulation and stabilization procedure. Use the... during service accumulation is allowed only in accordance with § 90.118. (b) Engine pre-test...

  19. 40 CFR 90.408 - Pre-test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 21 2013-07-01 2013-07-01 false Pre-test procedures. 90.408 Section 90... Procedures § 90.408 Pre-test procedures. (a) Engine service accumulation and stabilization procedure. Use the... during service accumulation is allowed only in accordance with § 90.118. (b) Engine pre-test...

  20. Degradation mechanisms and accelerated testing in PEM fuel cells

    SciTech Connect

    Borup, Rodney L; Mukundan, Rangachary

    2010-01-01

    The durability of PEM fuel cells is a major barrier to the commercialization of these systems for stationary and transportation power applications. Although there has been recent progress in improving durability, further improvements are needed to meet the commercialization targets. Past improvements have largely been made possible because of the fundamental understanding of the underlying degradation mechanisms. By investigating component and cell degradation modes; defining the fundamental degradation mechanisms of components and component interactions new materials can be designed to improve durability. Various factors have been shown to affect the useful life of PEM fuel cells. Other issues arise from component optimization. Operational conditions (such as impurities in either the fuel and oxidant stream), cell environment, temperature (including subfreezing exposure), pressure, current, voltage, etc.; or transient versus continuous operation, including start-up and shutdown procedures, represent other factors that can affect cell performance and durability. The need for Accelerated Stress Tests (ASTs) can be quickly understood given the target lives for fuel cell systems: 5000 hours ({approx} 7 months) for automotive, and 40,000 hrs ({approx} 4.6 years) for stationary systems. Thus testing methods that enable more rapid screening of individual components to determine their durability characteristics, such as off-line environmental testing, are needed for evaluating new component durability in a reasonable turn-around time. This allows proposed improvements in a component to be evaluated rapidly and independently, subsequently allowing rapid advancement in PEM fuel cell durability. These tests are also crucial to developers in order to make sure that they do not sacrifice durability while making improvements in costs (e.g. lower platinum group metal [PGM] loading) and performance (e.g. thinner membrane or a GDL with better water management properties). To

  1. COMPACT PROTON INJECTOR AND FIRST ACCELERATOR SYSTEM TEST FOR COMPACT PROTON DIELECTRIC WALL CANCER THERAPY ACCELERATOR

    SciTech Connect

    Chen, Y; Guethlein, G; Caporaso, G; Sampayan, S; Blackfield, D; Cook, E; Falabella, S; Harris, J; Hawkins, S; Nelson, S; Poole, B; Richardson, R; Watson, J; Weir, J; Pearson, D

    2009-04-23

    A compact proton accelerator for cancer treatment is being developed by using the high-gradient dielectric insulator wall (DWA) technology [1-4]. We are testing all the essential DWA components, including a compact proton source, on the First Article System Test (FAST). The configuration and progress on the injector and FAST will be presented.

  2. 40 CFR 86.425-78 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Later New Motorcycles, General Provisions § 86.425-78 Test procedures. (a) Motorcycle emission test... motorcycle which he determines is not susceptible to satisfactory testing by the procedures set forth in...

  3. 40 CFR 86.425-78 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Later New Motorcycles, General Provisions § 86.425-78 Test procedures. (a) Motorcycle emission test... motorcycle which he determines is not susceptible to satisfactory testing by the procedures set forth in...

  4. 40 CFR 86.425-78 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Later New Motorcycles, General Provisions § 86.425-78 Test procedures. (a) Motorcycle emission test... motorcycle which he determines is not susceptible to satisfactory testing by the procedures set forth in...

  5. 40 CFR 86.425-78 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Later New Motorcycles, General Provisions § 86.425-78 Test procedures. (a) Motorcycle emission test... motorcycle which he determines is not susceptible to satisfactory testing by the procedures set forth in...

  6. 40 CFR 86.425-78 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Later New Motorcycles, General Provisions § 86.425-78 Test procedures. (a) Motorcycle emission test... motorcycle which he determines is not susceptible to satisfactory testing by the procedures set forth in...

  7. 40 CFR 60.374 - Test methods and procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Battery Manufacturing Plants § 60.374 Test methods and procedures. (a) In conducting the performance tests required in § 60.8, the owner or operator shall use as reference methods and procedures the test methods...

  8. 40 CFR 60.374 - Test methods and procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Battery Manufacturing Plants § 60.374 Test methods and procedures. (a) In conducting the performance tests required in § 60.8, the owner or operator shall use as reference methods and procedures the test methods...

  9. Operator coil monitoring acceptance test procedure

    SciTech Connect

    Erhart, M.F.

    1995-06-05

    The readiness of the Data Acquisition and Control System (DACS) to provide monitoring and control of the Programmable Logic Controller (PLC) abort coils from the Master and RSS stations will be systematically tested during performance of this procedure. It should be noted that these are not physical abort coils but software coils controlled by the software`s ladder logic. The readiness of the DACS to properly interface with the ENRAF wire level gauge installed in the SY101 storage tank will also be tested. During this test, a verification of all abort coil indications will be conducted at the DACS Development Facility in the 306E Building by injecting an input signal for each DACS sensor that has an associated abort coil until the abort coil actuates, and then ensuring that the status of the abort coil indicated at the Master and RSS stations correct. Each abort coil will also be tested to ensure that the ``ENABLE`` and ``DISABLE`` controls from the Master and RSS stations function correctly, and only with the use of proper passwords.

  10. Operator coil monitoring Acceptance Test Procedure

    SciTech Connect

    Erhart, M.F.

    1995-05-16

    The readiness of the Data Acquisition and Control System (DACS) to provide monitoring and control of the Programmable Logic Controller (PLC) abort coils from the Master and RSS stations will be systematically tested during performance of this procedure. It should be noted that these are not physical abort coils but software coils controlled by the software`s ladder logic. The readiness of the DACS to properly interface with the ENRAF wire level gauge installed in the SY-101 storage tank will also be tested. During this test, a verification of all abort coil indications will be conducted at the DACS Development Facility in the 306E Building by injecting an input signal for each DACS sensor that has an associated abort coil until the abort coil actuates, and then ensuring that the status of the abort coil indicated at the Master and RSS stations is correct. Each abort coil will also be tested to ensure that the ``ENABLE`` and ``DISABLE`` controls from the Master and RSS stations function correctly, and only with the use of proper passwords.

  11. Computer modeling of test particle acceleration at oblique shocks

    NASA Technical Reports Server (NTRS)

    Decker, Robert B.

    1988-01-01

    The present evaluation of the basic techniques and illustrative results of charged particle-modeling numerical codes suitable for particle acceleration at oblique, fast-mode collisionless shocks emphasizes the treatment of ions as test particles, calculating particle dynamics through numerical integration along exact phase-space orbits. Attention is given to the acceleration of particles at planar, infinitessimally thin shocks, as well as to plasma simulations in which low-energy ions are injected and accelerated at quasi-perpendicular shocks with internal structure.

  12. The Advanced Superconducting Test Accelerator at Fermilab: Science Program

    SciTech Connect

    Piot, Philippe; Harms, Elvin; Henderson, Stuart; Leibfritz, Jerry; Nagaitsev, Sergei; Shiltsev, Vladimir; Valishev, Alexander

    2014-07-01

    The Advanced Superconducting Test Accelerator (ASTA) currently in commissioning phase at Fermilab is foreseen to support a broad range of beam-based experiments to study fundamental limitations to beam intensity and to develop novel approaches to particle-beam generation, acceleration and manipulation. ASTA incorporates a superconducting radiofrequency (SCRF) linac coupled to a flexible high-brightness photoinjector. The facility also includes a small-circumference storage ring capable of storing electrons or protons. This report summarizes the facility capabilities, and provide an overview of the accelerator-science researches to be enabled.

  13. Preliminary description of the ground test accelerator cryogenic cooling system

    SciTech Connect

    Edeskuty, F.J.; Stewart, W.F.

    1988-01-01

    The Ground Test Accelerator (GTA) under construction at the Los Alamos National Laboratory is part of the Neutral Particle Beam Program supported by the Strategic Defense Initiative Office. The GTA is a full-sized test facility to evaluate the feasibility of using a negative ion accelerator to produce a neutral particle beam (NPB). The NPB would ultimately be used outside the earth's atmosphere as a target discriminator or as a directed energy weapon. The operation of the GTA at cryogenic temperature is advantageous for two reasons: first, the decrease of temperature caused a corresponding decrease in the rf heating of the copper in the various units of the accelerator, and second, at the lower temperature the decrease in the thermal expansion coefficient also provides greater thermal stability and consequently, better operating stability for the accelerator. This paper discusses the cryogenic cooling system needed to achieve these advantages. 5 figs., 3 tabs.

  14. Earth Scanner Bearing Accelerated Life Test

    NASA Technical Reports Server (NTRS)

    Dietz, Brian J.; VanDyk, Steven G.; Predmore, Roamer E.

    2000-01-01

    The Moderate Resolution Imaging Spectrometer (MODIS) optical instrument for NASA Goddard will measure biological and physical processes on the Earth's surface and in the lower atmosphere. A key component of the instrument is an extremely accurate scan mirror motor/encoder assembly. Of prime concern in the performance and reliability of the scan motor/encoder is bearing selection and lubrication. This paper describes life testing of the bearings and lubrication selected for the program.

  15. Earth Scanner Bearing Accelerated Life Test

    NASA Technical Reports Server (NTRS)

    Dietz, Brian J.; VanDyk, Steven G.; Predmore, Roamer E.

    2000-01-01

    The Moderate Resolution Imaging Spectrometer (MODIS) optical instrument for NASA Goddard will measure biological and physical processes on the Earth's surface and in the lower atmosphere. A key component of the instrument is an extremely accurate scan mirror motor/encoder assembly. Of prime concern in the performance and reliability of the scan motor/encoder is bearing selection and lubrication. This paper describes life testing of the bearings and lubrication selected for the program.

  16. 43 CFR 4.113 - Optional small claims (expedited) and accelerated procedures. (See § 4.100(a)(2).)

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Optional small claims (expedited) and accelerated procedures. (See § 4.100(a)(2).) 4.113 Section 4.113 Public Lands: Interior Office of the... accelerated procedures. (See § 4.100(a)(2).) (a) The procedures set forth in this rule are available solely...

  17. Accelerated Durability Testing of Electrochromic Windows

    SciTech Connect

    Tracy, C. E.; Zhang, J. G.; Benson, D. K.; Czanderna, A. W.; Deb, S. K.

    1998-12-29

    Prototype electrochromic windows made by several different U.S. companies have been tested in our laboratory for their long-term durability. Samples were subjected to alternate coloring and bleaching voltage cycles while exposed to simulated on 1-sun irradiance in a temperature-controlled environmental chamber with low relative humidity. The samples inside the chamber were tested under a matrix of different conditions. These conditions include: cycling at different temperatures (65 C, 85 C, and 107 C) under the irradiance, cycling versus no-cycling under the same irradiance and temperature, testing with different voltage waveforms and duty cycles with the same irradiance and temperature, cycling under various filtered irradiance intensities, and simple thermal exposure with no irradiance or cycling. The electro-optical characteristics of the samples were measured between 350 and 1,100 nm every 4,000 cycles for up to 20,000 cycles. Photographs of the samples were taken periodically wi th a digital camera to record cosmetic defects, the extent of residual coloration, and overall coloration and bleaching uniformity of the samples. Our results indicate that the most important cause of degradation is the combination of continuous cycling, elevated temperature, and irradiance. The relative importance of these variables, when considered synergistically or separately, depends on the particular device materials and design.

  18. MHD turbulence, reconnection, and test-particle acceleration

    NASA Technical Reports Server (NTRS)

    Gray, Perry C.; Matthaeus, William H.

    1992-01-01

    We examine homogeneous MHD turbulence and turbulent magnetic reconnection as possible mechanisms for accelerating cosmic ray particles. Test particle calculations are performed using fields from MHD simulations, and initially Maxwellian particle distributions are shown to evolve into power-law distributions. Simple estimates for both the maximum energy attainable and the mean energies of the accelerated particles are fairly successful and are consistent with timescales for flares and cosmic rays.

  19. Laboratory procedures for waste form testing

    SciTech Connect

    Mast, E.S.

    1994-09-19

    The 100 and 300 areas of the Hanford Site are included on the US Environmental Protection Agencies (EPA) National Priorities List under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Soil washing is a treatment process that is being considered for the remediation of the soil in these areas. Contaminated soil washing fines can be mixed or blended with cementations materials to produce stable waste forms that can be used for beneficial purposes in mixed or low-level waste landfills, burial trenches, environmental restoration sites, and other applications. This process has been termed co-disposal. The Co-Disposal Treatability Study Test Plan is designed to identify a range of cement-based formulations that could be used in disposal efforts in Hanford in co-disposal applications. The purpose of this document is to provide explicit procedural information for the testing of co-disposal formulations. This plan also provides a discussion of laboratory safety and quality assurance necessary to ensure safe, reproducible testing in the laboratory.

  20. Accelerated Stress Testing of Solar Photovoltaic Modules

    DTIC Science & Technology

    1981-09-01

    1200C (2480F) 2 0.0 z -A VZe~ or z- V - 011-: r t r- 1’ 4m a. .5&.A - -i Z I -1 - 4K-3 ’P, 4 m mqzl S; 0. OLAOR POT.!’R LPk. ~~ dml I’.v SPCTROLA3...I _ . ..,_- -’I ... _ ESI !- I’ ’ [ : 1 ’" 󈧓 S * r_- M A~ IIN U F= IC TI~E S - P E CT~ L E:I F M i O _ L_ ,1: u cI__ C I -3’ UL...alternate spraying with fresh water and drying . (using eight GE 275-watt sunlamps and four GE 40BL ultraviolet lamps). This pre-exposure test continued

  1. Evaluation of an Accelerated ELDRS Test Using Molecular Hydrogen

    NASA Technical Reports Server (NTRS)

    Pease, Ronald L.; Adell, Philippe C.; Rax, Bernard; McClure, Steven; Barnaby, Hugh J.; Kruckmeyer, Kirby; Triggs, B.

    2011-01-01

    An accelerated total ionizing dose (TID) hardness assurance test for enhanced low dose rate sensitive (ELDRS) bipolar linear circuits, using high dose rate tests on parts that have been exposed to molecular hydrogen, has been proposed and demonstrated on several ELDRS part types. In this study several radiation-hardened "ELDRS-free" part types have been tested using this same approach to see if the test is overly conservative.

  2. 40 CFR 89.404 - Test procedure overview.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) CONTROL OF EMISSIONS FROM NEW AND IN-USE NONROAD COMPRESSION-IGNITION ENGINES Exhaust Emission Test Procedures § 89.404 Test procedure overview. (a) The test consists of prescribed sequences of... 40 Protection of Environment 20 2011-07-01 2011-07-01 false Test procedure overview. 89.404...

  3. 40 CFR 1066.840 - Highway fuel economy test procedure.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 33 2014-07-01 2014-07-01 false Highway fuel economy test procedure... Highway fuel economy test procedure. This section describes the procedure for the highway fuel economy test (HFET). This test involves emission sampling and fuel economy measurement for certain vehicles as...

  4. Factory Acceptance Test Procedure Westinghouse 100 ton Hydraulic Trailer

    SciTech Connect

    Aftanas, B.L.

    1994-11-16

    This Factory Acceptance Test Procedure (FAT) is for the Westinghouse 100 Ton Hydraulic Trailer. The trailer will be used for the removal of the 101-SY pump. This procedure includes: safety check and safety procedures; pre-operation check out; startup; leveling trailer; functional/proofload test; proofload testing; and rolling load test.

  5. 40 CFR 60.154 - Test methods and procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false Test methods and procedures. 60.154... Plants § 60.154 Test methods and procedures. (a) In conducting the performance tests required in § 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A...

  6. 40 CFR 60.176 - Test methods and procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false Test methods and procedures. 60.176... Smelters § 60.176 Test methods and procedures. (a) In conducting the performance tests required in § 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A...

  7. 40 CFR 60.166 - Test methods and procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false Test methods and procedures. 60.166... Smelters § 60.166 Test methods and procedures. (a) In conducting performance tests required in § 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A of...

  8. 40 CFR 60.154 - Test methods and procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 7 2013-07-01 2013-07-01 false Test methods and procedures. 60.154... Plants § 60.154 Test methods and procedures. (a) In conducting the performance tests required in § 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A...

  9. 40 CFR 60.176 - Test methods and procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false Test methods and procedures. 60.176... Smelters § 60.176 Test methods and procedures. (a) In conducting the performance tests required in § 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A...

  10. 40 CFR 60.166 - Test methods and procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false Test methods and procedures. 60.166... Smelters § 60.166 Test methods and procedures. (a) In conducting performance tests required in § 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A of...

  11. 40 CFR 60.154 - Test methods and procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false Test methods and procedures. 60.154... Plants § 60.154 Test methods and procedures. (a) In conducting the performance tests required in § 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A...

  12. 40 CFR 60.154 - Test methods and procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 7 2014-07-01 2014-07-01 false Test methods and procedures. 60.154... Plants § 60.154 Test methods and procedures. (a) In conducting the performance tests required in § 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A...

  13. 40 CFR 60.186 - Test methods and procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 7 2014-07-01 2014-07-01 false Test methods and procedures. 60.186... Smelters § 60.186 Test methods and procedures. (a) In conducting the performance tests required in § 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A...

  14. 40 CFR 60.54 - Test methods and procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false Test methods and procedures. 60.54... § 60.54 Test methods and procedures. (a) In conducting the performance tests required in § 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A of...

  15. 40 CFR 60.186 - Test methods and procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false Test methods and procedures. 60.186... Smelters § 60.186 Test methods and procedures. (a) In conducting the performance tests required in § 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A...

  16. 40 CFR 60.186 - Test methods and procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false Test methods and procedures. 60.186... Smelters § 60.186 Test methods and procedures. (a) In conducting the performance tests required in § 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A...

  17. 40 CFR 60.54 - Test methods and procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false Test methods and procedures. 60.54... § 60.54 Test methods and procedures. (a) In conducting the performance tests required in § 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A of...

  18. An improved Hochberg procedure for multiple tests of significance.

    PubMed

    Rom, Dror M

    2013-02-01

    We propose a simple modification of Hochberg's step-up Bonferroni procedure for multiple tests of significance. The proposed procedure is always more powerful than Hochberg's procedure for more than two tests, and is more powerful than Hommel's procedure for three and four tests. A numerical analysis of the new procedure indicates that its Type I error is controlled under independence of the test statistics, at a level equal to or just below the nominal Type I error. Examination of various non-null configurations of hypotheses shows that the modified procedure has a power advantage over Hochberg's procedure which increases in relationship to the number of false hypotheses.

  19. Development of an accelerated leach test(s) for low-level waste forms

    SciTech Connect

    Dougherty, D.R.; Fuhrmann, M.; Colombo, P.

    1985-01-01

    An accelerated leach test(s) is being developed to predict long-term leaching behavior of low-level radioactive waste (LLW) forms in their disposal environments. As necessary background, a literature survey of reported leaching mechanisms, available mathematical models and factors that affect leaching of LLW forms has been compiled. Mechanisms which have been identified include diffusion, dissolution, ion exchange, corrosion and surface effects. A computerized data base of LLW leaching data and mathematical models is being developed. The data is being used for model evaluation by curve fitting and statistical analysis according to standard procedures of statistical quality control. Long-term leach tests on portland cement, bitumen and vinyl ester-styrene (VES) polymer waste forms are underway which are designed to identify and evaluate factors that accelerate leaching without changing the mechanisms. Initial results on the effect of temperature on leachability indicate that the leach rates of cement and VES waste forms increase with increasing temperature, whereas, the leach rate of bitumen is little affected. 10 refs., 5 figs.

  20. 40 CFR 89.508 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... procedure as adopted in the California Regulations for New 1996 and Later Heavy-Duty Off-Road Diesel Cycle... exhaust emission standard (or applicable FEL) for oxides of nitrogen. If alternate procedures were used...

  1. 40 CFR 89.508 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... procedure as adopted in the California Regulations for New 1996 and Later Heavy-Duty Off-Road Diesel Cycle... exhaust emission standard (or applicable FEL) for oxides of nitrogen. If alternate procedures were used...

  2. 40 CFR 89.508 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... procedure as adopted in the California Regulations for New 1996 and Later Heavy-Duty Off-Road Diesel Cycle... exhaust emission standard (or applicable FEL) for oxides of nitrogen. If alternate procedures were used...

  3. Antimicrobial Testing Methods & Procedures Developed by EPA's Microbiology Laboratory

    EPA Pesticide Factsheets

    We develop antimicrobial testing methods and standard operating procedures to measure the effectiveness of hard surface disinfectants against a variety of microorganisms. Find methods and procedures for antimicrobial testing.

  4. TESTING METGLAS FOR USE IN DARHT ACCELERATOR CELLS

    SciTech Connect

    E.A. ROSE; D.A. DALMAS; J.N. DOWNING; R.D. TEMPLE

    2001-06-01

    The Dual Axis Radiographic Hydrotest Facility [DARHT] at Los Alamos will use two induction linacs to produce high-energy electron beams. The electron beams will be used to generate x-rays from bremsstrahlung targets. The x-rays will be used to produce radiographs. The first accelerator is operational now, producing a 60-nanosecond electron beam. The second accelerator is under construction. It will produce a 2-microsecond electron beam. The 78 induction cells of the second axis accelerator require a total Metglas capacity of approximately 40 volt seconds of flux. Four Metglas cores are used in each of the 5-foot diameter accelerator cells. Each Metglas core weighs approximately 3000 pounds. This paper presents the measurement techniques and results of the Metglas tests. Routine automated analysis and archival of the pulse data provided hysteresis curves, energy loss curves and total flux swing in the operating regime. Results of the tests were used to help the manufacturer improve quality control and increase the average flux swing of the cores. Results of the tests were used to match Metglas cores and to assemble accelerator cells with equal volt-second ratings.

  5. Accelerated life testing effects on CMOS microcircuit characteristics, phase 1

    NASA Technical Reports Server (NTRS)

    Maximow, B.

    1976-01-01

    An accelerated life test of sufficient duration to generate a minimum of 50% cumulative failures in lots of CMOS devices was conducted to provide a basis for determining the consistency of activation energy at 250 C. An investigation was made to determine whether any thresholds were exceeded during the high temperature testing, which could trigger failure mechanisms unique to that temperature. The usefulness of the 250 C temperature test as a predictor of long term reliability was evaluated.

  6. 40 CFR 87.62 - Test procedure (propulsion engines).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 21 2012-07-01 2012-07-01 false Test procedure (propulsion engines). 87.62 Section 87.62 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) Definitions. Test Procedures § 87.62 Test procedure (propulsion engines). Link to...

  7. 40 CFR 91.411 - Post-test analyzer procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 21 2013-07-01 2013-07-01 false Post-test analyzer procedures. 91.411... Post-test analyzer procedures. (a) Perform a hang-up check within 60 seconds of the completion of the last mode in the test. Use the following procedure: (1) Introduce a zero-grade gas or room air into the...

  8. 40 CFR 89.408 - Post-test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Procedures § 89.408 Post-test procedures. (a) A hangup check is recommended at the completion of the last... 40 Protection of Environment 21 2013-07-01 2013-07-01 false Post-test procedures. 89.408 Section... completion of the last mode in the test. Record for each analyzer the zero and span response (c) If during...

  9. 40 CFR 401.13 - Test procedures for measurement.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 29 2011-07-01 2009-07-01 true Test procedures for measurement. 401.13 Section 401.13 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS GENERAL PROVISIONS § 401.13 Test procedures for measurement. The test procedures for...

  10. 40 CFR 133.104 - Sampling and test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 23 2012-07-01 2012-07-01 false Sampling and test procedures. 133.104 Section 133.104 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS SECONDARY TREATMENT REGULATION § 133.104 Sampling and test procedures. (a) Sampling and test procedures for...

  11. 40 CFR 401.13 - Test procedures for measurement.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 30 2012-07-01 2012-07-01 false Test procedures for measurement. 401.13 Section 401.13 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS GENERAL PROVISIONS § 401.13 Test procedures for measurement. The test procedures for...

  12. 40 CFR 89.408 - Post-test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) CONTROL OF EMISSIONS FROM NEW AND IN-USE NONROAD COMPRESSION-IGNITION ENGINES Exhaust Emission Test Procedures § 89.408 Post-test procedures. (a) A hangup check is recommended at the completion of the last... 40 Protection of Environment 20 2011-07-01 2011-07-01 false Post-test procedures. 89.408 Section...

  13. 40 CFR 133.104 - Sampling and test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Sampling and test procedures. 133.104 Section 133.104 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS SECONDARY TREATMENT REGULATION § 133.104 Sampling and test procedures. (a) Sampling and test procedures...

  14. 40 CFR 86.884-5 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... New Diesel Heavy-Duty Engines; Smoke Exhaust Test Procedure § 86.884-5 Test procedures. The procedures..., or eliminating smoke emissions and to uncontrolled engines. (b) The test is designed to determine the opacity of smoke in exhaust emissions during those engine operating conditions which tend to promote smoke...

  15. 40 CFR 86.884-5 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... New Diesel Heavy-Duty Engines; Smoke Exhaust Test Procedure § 86.884-5 Test procedures. The procedures..., or eliminating smoke emissions and to uncontrolled engines. (b) The test is designed to determine the opacity of smoke in exhaust emissions during those engine operating conditions which tend to promote smoke...

  16. 40 CFR 86.527-90 - Test procedures, overview.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 18 2011-07-01 2011-07-01 false Test procedures, overview. 86.527-90 Section 86.527-90 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... 1978 and Later New Motorcycles; Test Procedures § 86.527-90 Test procedures, overview. (a)...

  17. 40 CFR 86.527-90 - Test procedures, overview.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 18 2010-07-01 2010-07-01 false Test procedures, overview. 86.527-90 Section 86.527-90 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... 1978 and Later New Motorcycles; Test Procedures § 86.527-90 Test procedures, overview. (a)...

  18. 40 CFR 86.227-94 - Test procedures; overview.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 18 2011-07-01 2011-07-01 false Test procedures; overview. 86.227-94 Section 86.227-94 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS...-Duty Passenger Vehicles; Cold Temperature Test Procedures § 86.227-94 Test procedures; overview....

  19. 40 CFR 86.227-94 - Test procedures; overview.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 18 2010-07-01 2010-07-01 false Test procedures; overview. 86.227-94 Section 86.227-94 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS...-Duty Passenger Vehicles; Cold Temperature Test Procedures § 86.227-94 Test procedures; overview....

  20. 49 CFR 219.605 - Positive drug test results; procedures.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CONTROL OF ALCOHOL AND DRUG USE Random Alcohol and Drug Testing Programs § 219.605 Positive drug test results; procedures. (a) [Reserved] (b) Procedures for administrative... 49 Transportation 4 2014-10-01 2014-10-01 false Positive drug test results; procedures. 219.605...

  1. 49 CFR 219.605 - Positive drug test results; procedures.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CONTROL OF ALCOHOL AND DRUG USE Random Alcohol and Drug Testing Programs § 219.605 Positive drug test results; procedures. (a) (b) Procedures for administrative handling... 49 Transportation 4 2012-10-01 2012-10-01 false Positive drug test results; procedures. 219.605...

  2. 49 CFR 219.605 - Positive drug test results; procedures.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CONTROL OF ALCOHOL AND DRUG USE Random Alcohol and Drug Testing Programs § 219.605 Positive drug test results; procedures. (a) (b) Procedures for administrative handling... 49 Transportation 4 2013-10-01 2013-10-01 false Positive drug test results; procedures. 219.605...

  3. 49 CFR 219.605 - Positive drug test results; procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CONTROL OF ALCOHOL AND DRUG USE Random Alcohol and Drug Testing Programs § 219.605 Positive drug test results; procedures. (a) [Reserved] (b) Procedures for administrative... 49 Transportation 4 2011-10-01 2011-10-01 false Positive drug test results; procedures. 219.605...

  4. 40 CFR 401.13 - Test procedures for measurement.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 28 2010-07-01 2010-07-01 true Test procedures for measurement. 401.13 Section 401.13 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS GENERAL PROVISIONS § 401.13 Test procedures for measurement. The test procedures...

  5. 21 CFR 1010.13 - Special test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ...) RADIOLOGICAL HEALTH PERFORMANCE STANDARDS FOR ELECTRONIC PRODUCTS: GENERAL Alternate Test Procedures § 1010.13 Special test procedures. The Director, Center for Devices and Radiological Health, may, on the basis of a... 21 Food and Drugs 8 2011-04-01 2011-04-01 false Special test procedures. 1010.13 Section...

  6. 21 CFR 1010.13 - Special test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...) RADIOLOGICAL HEALTH PERFORMANCE STANDARDS FOR ELECTRONIC PRODUCTS: GENERAL Alternate Test Procedures § 1010.13 Special test procedures. The Director, Center for Devices and Radiological Health, may, on the basis of a... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Special test procedures. 1010.13 Section...

  7. 49 CFR 655.51 - Compliance with testing procedures requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PREVENTION OF ALCOHOL MISUSE AND PROHIBITED DRUG USE IN TRANSIT OPERATIONS Drug and Alcohol Testing Procedures § 655.51 Compliance with testing procedures requirements. The drug and alcohol testing procedures in 49 CFR Part 40 apply to employers covered by this part...

  8. 49 CFR 655.51 - Compliance with testing procedures requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PREVENTION OF ALCOHOL MISUSE AND PROHIBITED DRUG USE IN TRANSIT OPERATIONS Drug and Alcohol Testing Procedures § 655.51 Compliance with testing procedures requirements. The drug and alcohol testing procedures in 49 CFR Part 40 apply to employers covered by this part...

  9. 40 CFR 133.104 - Sampling and test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 23 2013-07-01 2013-07-01 false Sampling and test procedures. 133.104 Section 133.104 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS SECONDARY TREATMENT REGULATION § 133.104 Sampling and test procedures. (a) Sampling and test procedures for...

  10. 40 CFR 133.104 - Sampling and test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 22 2014-07-01 2013-07-01 true Sampling and test procedures. 133.104 Section 133.104 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS SECONDARY TREATMENT REGULATION § 133.104 Sampling and test procedures. (a) Sampling and test procedures for...

  11. 40 CFR 133.104 - Sampling and test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 22 2011-07-01 2011-07-01 false Sampling and test procedures. 133.104 Section 133.104 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS SECONDARY TREATMENT REGULATION § 133.104 Sampling and test procedures. (a) Sampling and test procedures for...

  12. 46 CFR 130.480 - Test procedure and operations manual.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Test procedure and operations manual. 130.480 Section....480 Test procedure and operations manual. (a) A procedure for tests to be conducted on automated... detailed operations manual that describes the operation and indicates the location of each system...

  13. 40 CFR 401.13 - Test procedures for measurement.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 29 2014-07-01 2012-07-01 true Test procedures for measurement. 401.13... AND STANDARDS GENERAL PROVISIONS § 401.13 Test procedures for measurement. The test procedures for measurement which are prescribed at part 136 of this chapter shall apply to expressions of pollutant amounts...

  14. 40 CFR 401.13 - Test procedures for measurement.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 30 2013-07-01 2012-07-01 true Test procedures for measurement. 401.13... AND STANDARDS GENERAL PROVISIONS § 401.13 Test procedures for measurement. The test procedures for measurement which are prescribed at part 136 of this chapter shall apply to expressions of pollutant amounts...

  15. MIT validation probe acceptance test procedure

    SciTech Connect

    Escamilla, S.A.

    1994-08-23

    As part of the Multi-Functional Instrument Trees (MITs) a Validation Probe is being fabricated by Los Alamos National Laboratories (LANL). The Validation Probe assembly is equipped with a Winch, depth counter, and a Resistance Temperature Detector (RTD) which will render a means for verifying the temperature readings of which will render a means for verifying the temperature readings of the MIT thermocouples. The purpose of this Acceptance Test Procedure (ATP) is to provide verification that the Validation Probe functions properly and accordingly to LANL design and specification. This ATP will be used for all Validation Probes procured from LANL. The ATP consists of a receiving inspection, RTD ambient temperature; RTD electrical failure, RTD insulation resistance, and accurate depth counter operation inspections. The Validation Probe is composed of an intank probe, a cable and winching system, and a riser extension (probe guide) which bolts onto the MIT. The validation`s thermal sensor is an RTD that is housed in a 0.062 inch diameter, magnesium oxide fill, 316 stainless steel tube. The sheath configuration provides a means for spring loading the sensor firmly against the validation tube`s inner wall. A 45 pound cylindrical body is connected above the sheath and is used as a force to lower the probe into the tank. This cylindrical body also provides the means to interconnect both electrically and mechanically to the winch system which lowers the probe to a specified location within the validation tube located in the tank.

  16. Ultrasonic agitation method for accelerating batch leaching tests

    SciTech Connect

    Caldwell, R.J.; Stegemann, J.A.; Chao, C.C.

    1996-12-31

    A method has been developed which uses ultrasonic cavitation to accelerate batch leaching tests. Batch leaching tests, in which attainment of an equilibrium between the solid sample and liquid leachant is desired, usually involve particle size reduction and mixing to hasten mass transfer of soluble compounds. In the study discussed here, mixing in the form of ultrasonic cavitation was used to supply an intense level of agitation. Breaking the liquid boundary layer surrounding individual waste particles ensured a maximum concentration gradient between the solid and liquid phases and accelerated attainment of steady state concentrations. Evaluation of the acceleration technique was made through comparison of leachate quality of stabilized/solidified (S/S) residue samples tested using the Wastewater Technology Centre`s (WTC) equilibrium extraction (EE) and an ultrasonically agitated version of the same test method (UEE). The sample preparation, liquid-to-solid ratio, extraction fluid, etc., specified in the EE method were held constant for the EE and UEE samples, while the duration and method of agitation was altered for the UEE samples. To date, this evaluation has been made using five metal finishing residues, which were selected based on their elevated concentrations of regulated contaminants. The results of the evaluations are presented and suggestions are made as to the applicability of this accelerated test method.

  17. Next Linear Collider Test Accelerator conceptual design report

    SciTech Connect

    Not Available

    1993-08-01

    This document presents the scientific justification and the conceptual design for the {open_quotes}Next Linear Collider Test Accelerator{close_quotes} (NLCTA) at SLAC. The goals of the NLCTA are to integrate the new technologies of X-band accelerator structures and rf systems being developed for the Next Linear Collider, to measure the growth of the {open_quotes}dark current{close_quotes} generated by rf field emission in the accelerator, to demonstrate multi-bunch beam-loading energy compensation and suppression of higher-order deflecting modes, and to measure any transverse components of the accelerating field. The NLCTA will be a 42-meter-long beam line consisting, consecutively, of a thermionic-cathode gun, an X-band buncher, a magnetic chicane, six 1.8-meter-long sections of 11.4-GHz accelerator structure, and a magnetic spectrometer. Initially, the unloaded accelerating gradient will be 50 MV/m. A higher-gradient upgrade option eventually would increase the unloaded gradient to 100 MV/m.

  18. Brookhaven National Laboratory's Accelerator Test Facility: research highlights and plans

    NASA Astrophysics Data System (ADS)

    Pogorelsky, I. V.; Ben-Zvi, I.

    2014-08-01

    The Accelerator Test Facility (ATF) at Brookhaven National Laboratory has served as a user facility for accelerator science for over a quarter of a century. In fulfilling this mission, the ATF offers the unique combination of a high-brightness 80 MeV electron beam that is synchronized to a 1 TW picosecond CO2 laser. We unveil herein our plan to considerably expand the ATF's floor space with an upgrade of the electron beam's energy to 300 MeV and the CO2 laser's peak power to 100 TW. This upgrade will propel the ATF even further to the forefront of research on advanced accelerators and radiation sources, supporting the most innovative ideas in this field. We discuss emerging opportunities for scientific breakthroughs, including the following: plasma wakefield acceleration studies in research directions already active at the ATF; laser wakefield acceleration (LWFA), where the longer laser wavelengths are expected to engender a proportional increase in the beam's charge while our linac will assure, for the first time, the opportunity to undertake detailed studies of seeding and staging of the LWFA; proton acceleration to the 100-200 MeV level, which is essential for medical applications; and others.

  19. Design of Octupole Channel for Integrable Optics Test Accelerator

    SciTech Connect

    Antipov, Sergey; Carlson, Kermit; Castellotti, Riccardo; Valishev, Alexander; Wesseln, Steven

    2016-06-01

    We present the design of octupole channel for Integrable Optics Test Accelerator (IOTA). IOTA is a test accelerator at Fermilab, aimed to conduct research towards high-intensity machines. One of the goals of the project is to demonstrate high nonlinear betatron tune shifts while retaining large dynamic aperture in a realistic accelerator design. At the first stage the tune shift will be attained with a special channel of octupoles, which creates a variable octupole potential over a 1.8 m length. The channel consists of 18 identical air-cooled octupole magnets. The magnets feature a simple low-cost design, while meeting the requirements on maximum gradient - up to 1.4 kG/cm³, and field quality - strength of harmonics below 1%. Numerical simulations show that the channel is capable of producing a nonlinear tune shift of 0.08 without restriction of dynamic aperture of the ring.

  20. The test pulse line ion accelerator in Lanzhou

    NASA Astrophysics Data System (ADS)

    Shen, Xiao-Kang; Cao, Shu-Chun; Zhang, Zi-Min; Zhao, Hong-Wei; Zhao, Quan-Tang; Liu, Ming; Jing, Yi; Li, Zhong-Ping; Wan, Ming; Wang, Bin; Yang, Chun-Ming; Xiao, Rong-Qing; Zhang, Ying-Fa; Li, Ji-An

    2012-03-01

    To accelerate intense, short pulsed heavy ion beams to the energies of interest for studies of high energy density physics and warm dense matter, the Pulse Line Ion Accelerator (PLIA), of which the axial acceleration gradient can achieve several MeV per meter with realistic helix parameters at very low cost, was developed in recent years. A simple prototype of PLIA for a proof-of-principle experiment called the Lanzhou Test PLIA was designed and constructed at the Institute of Modern Physics in Lanzhou, and the test result matches the calculated result well. The pattern of the axial electric field Ez and the velocity of the traveling wave were simulated by CST.

  1. Remote procedure calls for accelerator control at CERN current status and future trends

    NASA Astrophysics Data System (ADS)

    Kostro, Krzysztof

    1994-12-01

    RPC (Remote Procedure Call) is, due to it's transparency and ease of use, the simplest way to implement distributed client-server applications. At CERN this technique has been used for accelerator control since 1987. The tool developed by the control group called NC/RPC has been steadily improved and compares favorable with commercial RPC products. This tool is currently implemented on every significant UNIX workstation platform as well as on LynxOS, OS9, VMS and MS-DOS. We discuss RPC features which are essential in our accelerator control environment and compare NC/RPC with other RPC systems.

  2. rf breakdown tests of mm-wave metallic accelerating structures

    DOE PAGES

    Dal Forno, Massimo; Dolgashev, Valery; Bowden, Gordon; ...

    2016-01-06

    In this study, we explore the physics and frequency-scaling of vacuum rf breakdowns at sub-THz frequencies. We present the experimental results of rf tests performed in metallic mm-wave accelerating structures. These experiments were carried out at the facility for advanced accelerator experimental tests (FACET) at the SLAC National Accelerator Laboratory. The rf fields were excited by the FACET ultrarelativistic electron beam. We compared the performances of metal structures made with copper and stainless steel. The rf frequency of the fundamental accelerating mode, propagating in the structures at the speed of light, varies from 115 to 140 GHz. The traveling wavemore » structures are 0.1 m long and composed of 125 coupled cavities each. We determined the peak electric field and pulse length where the structures were not damaged by rf breakdowns. We calculated the electric and magnetic field correlated with the rf breakdowns using the FACET bunch parameters. The wakefields were calculated by a frequency domain method using periodic eigensolutions. Such a method takes into account wall losses and is applicable to a large variety of geometries. The maximum achieved accelerating gradient is 0.3 GV/m with a peak surface electric field of 1.5 GV/m and a pulse length of about 2.4 ns.« less

  3. rf breakdown tests of mm-wave metallic accelerating structures

    NASA Astrophysics Data System (ADS)

    Dal Forno, Massimo; Dolgashev, Valery; Bowden, Gordon; Clarke, Christine; Hogan, Mark; McCormick, Doug; Novokhatski, Alexander; Spataro, Bruno; Weathersby, Stephen; Tantawi, Sami G.

    2016-01-01

    We are exploring the physics and frequency-scaling of vacuum rf breakdowns at sub-THz frequencies. We present the experimental results of rf tests performed in metallic mm-wave accelerating structures. These experiments were carried out at the facility for advanced accelerator experimental tests (FACET) at the SLAC National Accelerator Laboratory. The rf fields were excited by the FACET ultrarelativistic electron beam. We compared the performances of metal structures made with copper and stainless steel. The rf frequency of the fundamental accelerating mode, propagating in the structures at the speed of light, varies from 115 to 140 GHz. The traveling wave structures are 0.1 m long and composed of 125 coupled cavities each. We determined the peak electric field and pulse length where the structures were not damaged by rf breakdowns. We calculated the electric and magnetic field correlated with the rf breakdowns using the FACET bunch parameters. The wakefields were calculated by a frequency domain method using periodic eigensolutions. Such a method takes into account wall losses and is applicable to a large variety of geometries. The maximum achieved accelerating gradient is 0.3 GV /m with a peak surface electric field of 1.5 GV /m and a pulse length of about 2.4 ns.

  4. Light duty utility arm phase 2 qualification test procedure

    SciTech Connect

    Barnes, G.A.

    1997-01-16

    This Acceptance Test Procedure (ATP) will test and verify that the Exhauster meets the specified functional requirements, safety requirements, operating requirements, and provide a record of the functional test results. The system/functions that will be tested are listed in the scope section of the Acceptance Test Procedure.

  5. Design of an X-band accelerating structure using a newly developed structural optimization procedure

    NASA Astrophysics Data System (ADS)

    Huang, Xiaoxia; Fang, Wencheng; Gu, Qiang; Zhao, Zhentang

    2017-05-01

    An X-band high gradient accelerating structure is a challenging technology for implementation in advanced electron linear accelerator facilities. The present work discusses the design of an X-band accelerating structure for dedicated application to a compact hard X-ray free electron laser facility at the Shanghai Institute of Applied Physics, and numerous design optimizations are conducted with consideration for radio frequency (RF) breakdown, RF efficiency, short-range wakefields, and dipole/quadrupole field modes, to ensure good beam quality and a high accelerating gradient. The designed X-band accelerating structure is a constant gradient structure with a 4π/5 operating mode and input and output dual-feed couplers in a racetrack shape. The design process employs a newly developed effective optimization procedure for optimization of the X-band accelerating structure. In addition, the specific design of couplers providing high beam quality by eliminating dipole field components and reducing quadrupole field components is discussed in detail.

  6. Accelerated life time testing of fused silica for DUV laser applications revised

    NASA Astrophysics Data System (ADS)

    Mühlig, Christian; Bublitz, Simon

    2013-11-01

    We report on the continuation of a comparative study of different fused silica materials for ArF laser applications. After selecting potentially suited fused silica materials from their laser induced absorption and compaction obtained by a short time testing procedure, accelerated life time tests have been undertaken by sample irradiating at liquid nitrogen temperature and subsequent direct absorption measurements using the laser induced deflection (LID) technique. The obtained degradation acceleration strongly differs between fused silica materials showing high and low OH contents, respectively. As a result, a difference in the absorption degradation mechanism between high and low OH containing fused silica is proposed. Consequently two different scenarios for an acceleration of the absorption degradation are derived.

  7. Step-Stress Accelerated Degradation Testing for Solar Reflectors: Preprint

    SciTech Connect

    Jones, W.; Elmore, R.; Lee, J.; Kennedy, C.

    2011-09-01

    To meet the challenge to reduce the cost of electricity generated with concentrating solar power (CSP) new low-cost reflector materials are being developed including metalized polymer reflectors and must be tested and validated against appropriate failure mechanisms. We explore the application of testing methods and statistical inference techniques for quantifying estimates and improving lifetimes of concentrating solar power (CSP) reflectors associated with failure mechanisms initiated by exposure to the ultraviolet (UV) part of the solar spectrum. In general, a suite of durability and reliability tests are available for testing a variety of failure mechanisms where the results of a set are required to understand overall lifetime of a CSP reflector. We will focus on the use of the Ultra-Accelerated Weathering System (UAWS) as a testing device for assessing various degradation patterns attributable to accelerated UV exposure. Depending on number of samples, test conditions, degradation and failure patterns, test results may be used to derive insight into failure mechanisms, associated physical parameters, lifetimes and uncertainties. In the most complicated case warranting advanced planning and statistical inference, step-stress accelerated degradation (SSADT) methods may be applied.

  8. Field Operations Program Chevrolet S-10 (Lead-Acid) Accelerated Reliability Testing - Final Report

    SciTech Connect

    J. Francfort; J. Argueta; M. Wehrey; D. Karner; L. Tyree

    1999-07-01

    This report summarizes the Accelerated Reliability testing of five lead-acid battery-equipped Chevrolet S-10 electric vehicles by the US Department of Energy's Field Operations Program and the Program's testing partners, Electric Transportation Applications (ETA) and Southern California Edison (SCE). ETA and SCE operated the S-10s with the goal of placing 25,000 miles on each vehicle within 1 year, providing an accelerated life-cycle analysis. The testing was performed according to established and published test procedures. The S-10s' average ranges were highest during summer months; changes in ambient temperature from night to day and from season-to-season impacted range by as much as 10 miles. Drivers also noted that excessive use of power during acceleration also had a dramatic effect on vehicle range. The spirited performance of the S-10s created a great temptation to inexperienced electric vehicle drivers to ''have a good time'' and to fully utilize the S-10's acceleration capability. The price of injudicious use of power is greatly reduced range and a long-term reduction in battery life. The range using full-power accelerations followed by rapid deceleration in city driving has been 20 miles or less.

  9. TMACS test procedure TP003: Graphics. Revision 6

    SciTech Connect

    Scanlan, P.K.; Washburn, S.

    1994-09-01

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the graphics requirements of the TMACS. The features to be tested are the data display graphics and the graphic elements that provide for operator control and selection of displays.

  10. Accelerated aging tests of liners for uranium mill tailings disposal

    SciTech Connect

    Barnes, S.M.; Buelt, J.L.; Hale, V.Q.

    1981-11-01

    This document describes the results of accelerated aging tests to determine the long-term effectiveness of selected impoundment liner materials in a uranium mill tailings environment. The study was sponsored by the US Department of Energy under the Uranium Mill Tailings Remedial Action Project. The study was designed to evaluate the need for, and the performance of, several candidate liners for isolating mill tailings leachate in conformance with proposed Environmental Protection Agency and Nuclear Regulatory Commission requirements. The liners were subjected to conditions known to accelerate the degradation mechanisms of the various liners. Also, a test environment was maintained that modeled the expected conditions at a mill tailings impoundment, including ground subsidence and the weight loading of tailings on the liners. A comparison of installation costs was also performed for the candidate liners. The laboratory testing and cost information prompted the selection of a catalytic airblown asphalt membrane and a sodium bentonite-amended soil for fiscal year 1981 field testing.

  11. Acceleration tests of a 3 GHz proton linear accelerator (LIBO) for hadrontherapy

    NASA Astrophysics Data System (ADS)

    De Martinis, C.; Giove, D.; Amaldi, U.; Berra, P.; Crandall, K.; Mauri, M.; Weiss, M.; Zennaro, R.; Rosso, E.; Szeless, B.; Vretenar, M.; Masullo, M. R.; Vaccaro, V.; Calabretta, L.; Rovelli, A.

    2012-07-01

    This paper describes the acceleration tests performed at the Catania LNS Laboratory on a 3 GHz linac module of the side coupled type, which boosts the proton energy of a beam extracted from a cyclotron from 62 to 72 MeV. The output proton energy was measured with two devices: a NaI(Tl) crystal and a bending magnet. The experimental spectra are in good agreement with the calculated ones. From their shape it is obtained that (18±3.0)% of the transmitted protons fall in a ±2 MeV interval centered around 72 MeV. This result is in good agreement with the 20% value derived from the simulation of the acceleration process. The measured energy of the accelerated protons was used to check that the shunt impedance of the structure is equal to the computed one within 3%. This was the first time that a 3 GHz structure has been used to accelerate protons, and the results of the tests have demonstrated that a high frequency linac can be used as a cyclotron booster.

  12. 702AZ aging waste ventilation facility year 2000 test procedure

    SciTech Connect

    Winkelman, W.D.

    1998-07-22

    This test procedure was developed to determine if the 702AZ Tank Ventilation Facility system is Year 2000 Compliant. The procedure provides detailed instructions for performing the operations necessary and documenting the results. This verification procedure will document that the 702AZ Facility Systems are year 2000 compliant and will correctly meet the criteria established in this procedure.

  13. School age test or procedure preparation

    MedlinePlus

    ... someone else who is helping with the procedure. Physical contact can help reduce pain and anxiety. Distract your child with books, bubbles, games, hand-held video games, or other activities. PLAY PREPARATION Children often ...

  14. 75 FR 37310 - Engine-Testing Procedures

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-29

    ....10.... Maximum, 0.175... ASTM D1319-03. Aromatics Maximum, 0.35.... Maximum, 0.304... Saturates Remainder........ Remainder........ * * * * * \\1\\ ASTM procedures are incorporated by reference in Sec. 1065...

  15. Cryogenic cooling system for the Ground Test Accelerator

    SciTech Connect

    Edeskuty, F.J.; Stewart, W.F.; Moeller, J.; Durham, F.; Spulgis, I.

    1994-12-31

    A cryogenic cooling system has been designed, built and tested for the Ground Test Accelerator (GTA) at the Los Alamos National Laboratory. Major components of the GTA require cooling to less than 50 K to reduce rf-heating and to increase thermal stability. The cooling system is capable of cooling (at an acceptable rate for thermal stresses) the cryogenically cooled components and then maintaining them at their operating temperature during accelerator testing for all modes and power levels of operation. The accelerator components are cooled by circulating cold, dense helium gas (about 21 K and 2.1 MPa) through the components. The circulating helium is refrigerated in a heat exchanger that uses boiling liquid hydrogen as a source of refrigeration. The cryogenic cooling system consists of the following major components: a liquid hydrogen (LH{sub 2}) storage Dewar with a transfer line to an LH{sub 2} run tank containing an LH{sub 2}/gaseous helium (GHe) heat exchanger, circulation lines, and a circulation pump. The system, sized to cool a load of approximately 40 kW at temperatures as low as 20 K, is operational, but has not yet been operated in conjunction with the accelerator.

  16. Cryogenic cooling system for the ground test accelerator

    SciTech Connect

    Edeskuty, F.J.; Stewart, W.F.; Moeller, J.; Durham, F. ); Spulgis, I. )

    1993-01-01

    A cryogenic cooling system has been designed, built and tested for the Ground Test Accelerator (GTA) at the Los Alamos National Laboratory. Major components of the GTA require cooling to less than 50 K to reduce rf-heating and to increase thermal stability. The cooling system is capable of cooling (at an acceptable rate for thermal stresses) the cryogenically cooled components and then maintaining them at their operating temperature during accelerator testing for all modes and power levels of operation. The accelerator components are cooled by circulating cold, dense helium gas (about 21 K and 2.1 MPa) through the components. The circulating helium is refrigerated in a heat exchanger that uses boiling liquid hydrogen as a source of refrigeration. The cryogenic cooling system consists of the following major components: a liquid hydrogen (LH[sub 2]) storage Dewar with a transfer line to an LH[sub 2] run tank containing an LH[sub 2]/gaseous helium (GHe) heat exchanger, circulation lines, and a circulation pump. The system, sized to cool a load of approximately 40 kW at temperatures as low as 20 K, is operational, but has not yet been operated in conjunction with the accelerator.

  17. Cryogenic cooling system for the ground test accelerator

    SciTech Connect

    Edeskuty, F.J.; Stewart, W.F.; Moeller, J.; Durham, F.; Spulgis, I.

    1993-06-01

    A cryogenic cooling system has been designed, built and tested for the Ground Test Accelerator (GTA) at the Los Alamos National Laboratory. Major components of the GTA require cooling to less than 50 K to reduce rf-heating and to increase thermal stability. The cooling system is capable of cooling (at an acceptable rate for thermal stresses) the cryogenically cooled components and then maintaining them at their operating temperature during accelerator testing for all modes and power levels of operation. The accelerator components are cooled by circulating cold, dense helium gas (about 21 K and 2.1 MPa) through the components. The circulating helium is refrigerated in a heat exchanger that uses boiling liquid hydrogen as a source of refrigeration. The cryogenic cooling system consists of the following major components: a liquid hydrogen (LH{sub 2}) storage Dewar with a transfer line to an LH{sub 2} run tank containing an LH{sub 2}/gaseous helium (GHe) heat exchanger, circulation lines, and a circulation pump. The system, sized to cool a load of approximately 40 kW at temperatures as low as 20 K, is operational, but has not yet been operated in conjunction with the accelerator.

  18. 40 CFR 89.114 - Special and alternate test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PROGRAMS (CONTINUED) CONTROL OF EMISSIONS FROM NEW AND IN-USE NONROAD COMPRESSION-IGNITION ENGINES Emission... elect to use an alternate test procedure provided that it yields equivalent results to the specified... generated under the specified procedures. (3) A manufacturer may elect to use the test procedures in 40 CFR...

  19. 40 CFR 136.4 - Application for alternate test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the alternate test procedure to the pollutant(s) or parameter(s) in waste water discharges from... procedures. 136.4 Section 136.4 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER... Region where the discharge occurs for approval of an alternative test procedure. (b) When the...

  20. 40 CFR 86.1427 - Certification Short Test procedure; overview.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 19 2010-07-01 2010-07-01 false Certification Short Test procedure; overview. 86.1427 Section 86.1427 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... procedure; overview. (a) The test procedure described in this subpart is designed to measure raw...

  1. 40 CFR 89.406 - Pre-test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 20 2011-07-01 2011-07-01 false Pre-test procedures. 89.406 Section 89.406 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... Procedures § 89.406 Pre-test procedures. (a) Allow a minimum of 30 minutes warmup in the standby or...

  2. 40 CFR 89.406 - Pre-test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 21 2013-07-01 2013-07-01 false Pre-test procedures. 89.406 Section 89.406 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... Procedures § 89.406 Pre-test procedures. (a) Allow a minimum of 30 minutes warmup in the standby or...

  3. 40 CFR 89.406 - Pre-test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 21 2012-07-01 2012-07-01 false Pre-test procedures. 89.406 Section 89.406 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... Procedures § 89.406 Pre-test procedures. (a) Allow a minimum of 30 minutes warmup in the standby or...

  4. 40 CFR Appendix B to Subpart S of... - Test Procedures

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 2 2014-07-01 2014-07-01 false Test Procedures B Appendix B to Subpart... Requirements Pt. 51, Subpt. S, App. B Appendix B to Subpart S of Part 51—Test Procedures (I) Idle test (a... begin 10 seconds after the applicable test mode begins. Exhaust gas concentrations shall be analyzed...

  5. 14 CFR 61.43 - Practical tests: General procedures.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Practical tests: General procedures. 61.43... Practical tests: General procedures. (a) Completion of the practical test for a certificate or rating... rating sought within the approved practical test standards; (2) Demonstrating mastery of the aircraft...

  6. 49 CFR 572.132 - Head assembly and test procedure.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Head assembly and test procedure. 572.132 Section... Hybrid III 5th Percentile Female Test Dummy, Alpha Version § 572.132 Head assembly and test procedure. (a) The head assembly (refer to § 572.130(a)(1)(i)) for this test consists of the complete head...

  7. 49 CFR 572.172 - Head assembly and test procedure.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Head assembly and test procedure. 572.172 Section... Hybrid III 10-Year-Old Child Test Dummy (HIII-10C) § 572.172 Head assembly and test procedure. (a) The head assembly for this test consists of the complete head (drawing 420-1000), a six-axis...

  8. 49 CFR 572.132 - Head assembly and test procedure.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Head assembly and test procedure. 572.132 Section... Hybrid III 5th Percentile Female Test Dummy, Alpha Version § 572.132 Head assembly and test procedure. (a) The head assembly (refer to § 572.130(a)(1)(i)) for this test consists of the complete head...

  9. 49 CFR 572.172 - Head assembly and test procedure.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Head assembly and test procedure. 572.172 Section... Hybrid III 10-Year-Old Child Test Dummy (HIII-10C) § 572.172 Head assembly and test procedure. (a) The head assembly for this test consists of the complete head (drawing 420-1000), a six-axis...

  10. 40 CFR 80.51 - Vehicle test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 16 2011-07-01 2011-07-01 false Vehicle test procedures. 80.51 Section...) REGULATION OF FUELS AND FUEL ADDITIVES Reformulated Gasoline § 80.51 Vehicle test procedures. The test sequence applicable when augmenting the emission models through vehicle testing is as follows: (a) Prepare...

  11. 40 CFR 80.51 - Vehicle test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 17 2014-07-01 2014-07-01 false Vehicle test procedures. 80.51 Section...) REGULATION OF FUELS AND FUEL ADDITIVES Reformulated Gasoline § 80.51 Vehicle test procedures. The test sequence applicable when augmenting the emission models through vehicle testing is as follows: (a) Prepare...

  12. 40 CFR 60.503 - Test methods and procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... level and shall end at the same reference point. The test shall include at least two startups and... 40 Protection of Environment 7 2012-07-01 2012-07-01 false Test methods and procedures. 60.503... Terminals § 60.503 Test methods and procedures. (a) In conducting the performance tests required in §...

  13. 40 CFR 91.507 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... EMISSIONS FROM MARINE SPARK-IGNITION ENGINES Manufacturer Production Line Testing Program § 91.507 Test..., production line testing and Selective Enforcement Audit testing, to any setting within the physically.... (1) Prior to performing exhaust emission production line testing, the manufacturer may accumulate...

  14. 40 CFR 91.507 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... EMISSIONS FROM MARINE SPARK-IGNITION ENGINES Manufacturer Production Line Testing Program § 91.507 Test..., production line testing and Selective Enforcement Audit testing, to any setting within the physically.... (1) Prior to performing exhaust emission production line testing, the manufacturer may accumulate...

  15. 40 CFR 91.507 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... EMISSIONS FROM MARINE SPARK-IGNITION ENGINES Manufacturer Production Line Testing Program § 91.507 Test..., production line testing and Selective Enforcement Audit testing, to any setting within the physically.... (1) Prior to performing exhaust emission production line testing, the manufacturer may accumulate...

  16. Fabrication and cold test of dielectric assist accelerating structure

    NASA Astrophysics Data System (ADS)

    Satoh, D.; Yoshida, M.; Hayashizaki, N.

    2017-09-01

    We present the detailed description of a successful design and cold testing of the dielectric assist accelerating (DAA) structure. The DAA structure consists of ultralow-loss dielectric cylinders and disks with irises which are periodically arranged in a metallic enclosure. The advantage of the DAA structure is that it has an extremely high quality factor and a very high shunt impedance at room temperature since the electromagnetic field distribution of accelerating mode can be controlled by dielectric parts so that the wall loss on the metallic surface is greatly reduced. A prototype of the five-cell DAA structure was designed and built at C-band (5.712 GHz), and cold tested. Three types of dielectric cell structure, "regular," "end," and "hybrid" dielectric cells, are fabricated by sintering high-purity magnesia. The prototype was assembled by stacking these cells in the hollow copper cylinder, whose two ends are closed by copper plates. The resonant frequency of the prototype was tuned to the desired frequency by machining only end copper plates. The unloaded quality factor of the accelerating mode was measured at 119,314 and the shunt impedance per unit length of the prototype was estimated from the experimental results of the bead pull measurement as Zsh=617 M Ω /m , which were within 2 percent of the design values. The field distribution of accelerating mode was also measured by the bead pull method, and its results agreed well with simulation results.

  17. High-voltage terminal test of a test stand for a 1-MV electrostatic accelerator

    NASA Astrophysics Data System (ADS)

    Park, Sae-Hoon; Kim, Yu-Seok

    2015-10-01

    The Korea Multipurpose Accelerator Complex has been developing a 300-kV test stand for a 1-MV electrostatic accelerator ion source. The ion source and accelerating tube will be installed in a high-pressure vessel. The ion source in the high-pressure vessel is required to have a high reliability. The test stand has been proposed and developed to confirm the stable operating conditions of the ion source. The ion source will be tested at the test stand to verify the long-time operating conditions. The test stand comprises a 300-kV high-voltage terminal, a battery for the ion-source power, a 60-Hz inverter, 200-MHz radio-frequency power supply, a 5-kV extraction power supply, a 300-kV accelerating tube, and a vacuum system. The results of the 300-kV high-voltage terminal tests are presented in this paper.

  18. 16 CFR 1616.5 - Test procedure.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...) Apparatus. The following test apparatus shall be used for the test. Alternate test apparatus may be used... shall be a steel cabinet with inside dimensions of 32.9 cm. (1215/16 in.) wide, 32.9 cm. (1215/16 in... cm. (1 in.) less than the cabinet floor dimensions. The cabinet to be used in this test method is...

  19. 16 CFR 1616.5 - Test procedure.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...) Apparatus. The following test apparatus shall be used for the test. Alternate test apparatus may be used... shall be a steel cabinet with inside dimensions of 32.9 cm. (1215/16 in.) wide, 32.9 cm. (1215/16 in... cm. (1 in.) less than the cabinet floor dimensions. The cabinet to be used in this test method is...

  20. Preloading To Accelerate Slow-Crack-Growth Testing

    NASA Technical Reports Server (NTRS)

    Gyekenyesi, John P.; Choi, Sung R.; Pawlik, Ralph J.

    2004-01-01

    An accelerated-testing methodology has been developed for measuring the slow-crack-growth (SCG) behavior of brittle materials. Like the prior methodology, the accelerated-testing methodology involves dynamic fatigue ( constant stress-rate) testing, in which a load or a displacement is applied to a specimen at a constant rate. SCG parameters or life prediction parameters needed for designing components made of the same material as that of the specimen are calculated from the relationship between (1) the strength of the material as measured in the test and (2) the applied stress rate used in the test. Despite its simplicity and convenience, dynamic fatigue testing as practiced heretofore has one major drawback: it is extremely time-consuming, especially at low stress rates. The present accelerated methodology reduces the time needed to test a specimen at a given rate of applied load, stress, or displacement. Instead of starting the test from zero applied load or displacement as in the prior methodology, one preloads the specimen and increases the applied load at the specified rate (see Figure 1). One might expect the preload to alter the results of the test and indeed it does, but fortunately, it is possible to account for the effect of the preload in interpreting the results. The accounting is done by calculating the normalized strength (defined as the strength in the presence of preload the strength in the absence of preload) as a function of (1) the preloading factor (defined as the preload stress the strength in the absence of preload) and (2) a SCG parameter, denoted n, that is used in a power-law crack-speed formulation. Figure 2 presents numerical results from this theoretical calculation.

  1. Test ion acceleration in a dynamic planar electron sheath

    NASA Astrophysics Data System (ADS)

    Basko, M. M.

    2007-03-01

    New exact results are obtained for relativistic acceleration of test positive ions in the laminar zone of a planar electron sheath evolving from an initially mono-energetic electron distribution. The electron dynamics is calculated against the background of motionless foil ions. The limiting gamma-factor γp∞ of accelerated ions is shown to be determined primarily by the values of the ion-electron charge-over-mass ratio μ=meZp/mp and the initial gamma-factor γ0 of the accelerated electrons. For μ> 1/8 a test ion always overtakes the electron front and attains γp∞> γ0. For μ< 1/8 a test ion can catch up with the electron front only when γ0 is above a certain critical value γcr, which for μ≪1 can most often be evaluated as γ_{cr} = ({1}/{4}) μexpleft(μ^{-1}-1right). In this model the protons and heavier test ions, for which γcr> 10398 is enormous, always lag behind the front edge of the electron sheath and have γp∞< γ0; for their maximum energy an appropriate intermediate asymptotic formula is derived. The domain of applicability of the laminar-zone results is analyzed in detail.

  2. Reproduction of natural corrosion by accelerated laboratory testing methods

    SciTech Connect

    Luo, J.S.; Wronkiewicz, D.J.; Mazer, J.J.; Bates, J.K.

    1996-05-01

    Various laboratory corrosion tests have been developed to study the behavior of glass waste forms under conditions similar to those expected in an engineered repository. The data generated by laboratory experiments are useful for understanding corrosion mechanisms and for developing chemical models to predict the long-term behavior of glass. However, it is challenging to demonstrate that these test methods produce results that can be directly related to projecting the behavior of glass waste forms over time periods of thousands of years. One method to build confidence in the applicability of the test methods is to study the natural processes that have been taking place over very long periods in environments similar to those of the repository. In this paper, we discuss whether accelerated testing methods alter the fundamental mechanisms of glass corrosion by comparing the alteration patterns that occur in naturally altered glasses with those that occur in accelerated laboratory environments. This comparison is done by (1) describing the alteration of glasses reacted in nature over long periods of time and in accelerated laboratory environments and (2) establishing the reaction kinetics of naturally altered glass and laboratory reacted glass waste forms.

  3. 40 CFR 89.508 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... EMISSIONS FROM NEW AND IN-USE NONROAD COMPRESSION-IGNITION ENGINES Selective Enforcement Auditing § 89.508... procedure as adopted in the California Regulations for New 1996 and Later Heavy-Duty Off-Road Diesel Cycle... information needed to establish an alternate minimum idle speed. The Administrator, in making or specifying...

  4. Accelerated stress testing of solar photovoltaic modules. Interim report

    SciTech Connect

    Trenchard, S.E.

    1981-09-01

    In 1974, the U.S. Coast Guard began investigating solar photovoltaic arrays as power sources for marine aids to navigation. Initially, 53 systems consisting of a solar array, battery, and a flashing lamp load were placed in a rooftop test facility adjacent to Long Island Sound in Groton, CT. Within two years, the solar arrays of 25 systems had no power output thereby indicating failure. Effects of the marine environment were judged to be responsible for the failures. In order to use solar arrays on operational aids to navigation, much greater reliability was essential. Consequently, development work was initiated on an accelerated stress test system that would rapidly identify solar photovoltaic modules capable of surviving in the marine environment. This interim report traces the history of accelerated stress testing of solar photovoltaic modules carried out at the U.S. Coast Guard RandD Center. It describes the military standard tests to which the prototype modules were exposed to and the results of that exposure. The report traces the evolution of the simultaneous multiple stress test to the present marine environment screening test. The results of exposure to the marine environment screening test of 136 test modules are reported.

  5. Mechanical Stability Study for Integrable Optics Test Accelerator at Fermilab

    SciTech Connect

    McGee, Mike; Andrews, Richard; Carlson, Kermit; Leibfritz, Jerry; Nobrega, Lucy; Valishev, Alexander

    2016-07-01

    The Integrable Optics Test Accelerator (IOTA) is proposed for operation at Fermilab. The goal of IOTA is to create practical nonlinear accelerator focusing systems with a large frequency spread and stable particle motion. The IOTA is a 40 m circumference, 150 MeV (e-), 2.5 MeV (p⁺) diagnostic test ring. A heavy low frequency steel floor girder is proposed as the primary tier for IOTA device component support. Two design lengths; (8) 4 m and (2) 2.8 m long girders with identical cross section completely encompass the ring. This study focuses on the 4 m length girder and the development of a working prototype. Hydrostatic Level Sensor (HLS), temperature, metrology and fast motion measurements characterize the anticipated mechanical stability of the IOTA ring.

  6. Antimicrobial Testing Methods & Procedures: MB-31

    EPA Pesticide Factsheets

    Information about ATMP - SOP Quantitative Disk Carrier Test Method (QCT-2) Modified for Testing Antimicrobial Products Against Spores of Clostridium difficile (ATCC 43598) on Inanimate, Hard, Non-porous Surfaces - MB-31-Final

  7. Test monkeys anesthetized by routine procedure

    NASA Technical Reports Server (NTRS)

    1965-01-01

    Test monkeys are safely anesthetized for five minutes by confining them for less than six minutes in enclosures containing a controlled volume of ether. Thus the monkeys can be properly and safely positioned on test couches and fitted with electrodes or other devices prior to physiological tests.

  8. 47 CFR 87.197 - ELT test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false ELT test procedures. 87.197 Section 87.197... Aircraft Stations Emergency Locator Transmitters § 87.197 ELT test procedures. ELT testing must avoid... with the ELT terminated into a dummy load. ...

  9. 47 CFR 87.197 - ELT test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false ELT test procedures. 87.197 Section 87.197... Aircraft Stations Emergency Locator Transmitters § 87.197 ELT test procedures. ELT testing must avoid... with the ELT terminated into a dummy load. ...

  10. 47 CFR 87.197 - ELT test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false ELT test procedures. 87.197 Section 87.197... Aircraft Stations Emergency Locator Transmitters § 87.197 ELT test procedures. ELT testing must avoid... with the ELT terminated into a dummy load. ...

  11. 47 CFR 87.197 - ELT test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false ELT test procedures. 87.197 Section 87.197... Aircraft Stations Emergency Locator Transmitters § 87.197 ELT test procedures. ELT testing must avoid... with the ELT terminated into a dummy load. ...

  12. 47 CFR 87.197 - ELT test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 5 2013-10-01 2013-10-01 false ELT test procedures. 87.197 Section 87.197... Aircraft Stations Emergency Locator Transmitters § 87.197 ELT test procedures. ELT testing must avoid... with the ELT terminated into a dummy load. ...

  13. 46 CFR 170.190 - Stability test procedure modifications.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Stability test procedure modifications. 170.190 Section... Gravity § 170.190 Stability test procedure modifications. The authorized Coast Guard or ABS representative present at a stability test may allow a deviation from the requirements of §§ 170.180 and 170.185 if...

  14. 40 CFR 91.404 - Test procedure overview.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 20 2011-07-01 2011-07-01 false Test procedure overview. 91.404 Section 91.404 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Test procedure overview. (a) The test consists of prescribed sequences of engine operating...

  15. 40 CFR 60.374 - Test methods and procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Test methods and procedures. 60.374 Section 60.374 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Battery Manufacturing Plants § 60.374 Test methods and procedures. (a) In conducting the performance tests...

  16. 49 CFR 572.162 - Head assembly and test procedure.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Head assembly and test procedure. 572.162 Section 572.162 Transportation Other Regulations Relating to Transportation (Continued) NATIONAL HIGHWAY... Hybrid III Six-Year-Old Weighted Child Test Dummy § 572.162 Head assembly and test procedure. The...

  17. 49 CFR 572.162 - Head assembly and test procedure.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Head assembly and test procedure. 572.162 Section 572.162 Transportation Other Regulations Relating to Transportation (Continued) NATIONAL HIGHWAY... Hybrid III Six-Year-Old Weighted Child Test Dummy § 572.162 Head assembly and test procedure. The...

  18. 49 CFR 572.162 - Head assembly and test procedure.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Head assembly and test procedure. 572.162 Section 572.162 Transportation Other Regulations Relating to Transportation (Continued) NATIONAL HIGHWAY... Hybrid III Six-Year-Old Weighted Child Test Dummy § 572.162 Head assembly and test procedure. The...

  19. 49 CFR 572.162 - Head assembly and test procedure.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Head assembly and test procedure. 572.162 Section 572.162 Transportation Other Regulations Relating to Transportation (Continued) NATIONAL HIGHWAY... Hybrid III Six-Year-Old Weighted Child Test Dummy § 572.162 Head assembly and test procedure. The...

  20. 49 CFR 572.162 - Head assembly and test procedure.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Head assembly and test procedure. 572.162 Section 572.162 Transportation Other Regulations Relating to Transportation (Continued) NATIONAL HIGHWAY... Hybrid III Six-Year-Old Weighted Child Test Dummy § 572.162 Head assembly and test procedure. The...

  1. 49 CFR 665.27 - Procedures during testing.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Procedures during testing. 665.27 Section 665.27 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BUS TESTING Operations § 665.27 Procedures during testing. (a) The...

  2. 49 CFR 665.27 - Procedures during testing.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Procedures during testing. 665.27 Section 665.27 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BUS TESTING Operations § 665.27 Procedures during testing. (a) The...

  3. 49 CFR 665.27 - Procedures during testing.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Procedures during testing. 665.27 Section 665.27 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BUS TESTING Operations § 665.27 Procedures during testing. (a) The...

  4. 49 CFR 665.27 - Procedures during testing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Procedures during testing. 665.27 Section 665.27 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BUS TESTING Operations § 665.27 Procedures during testing. (a) The...

  5. 49 CFR 665.27 - Procedures during testing.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Procedures during testing. 665.27 Section 665.27 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BUS TESTING Operations § 665.27 Procedures during testing. (a) The...

  6. 14 CFR Appendix F to Part 23 - Test Procedure

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... the actual cross section of the material or part installed in the airplane. When performing the test... STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Pt. 23, App. F Appendix F to Part 23—Test Procedure Acceptable test procedure for self-extinguishing materials for showing compliance...

  7. 40 CFR 91.404 - Test procedure overview.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Test procedure overview. 91.404 Section 91.404 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Test procedure overview. (a) The test consists of prescribed sequences of engine operating conditions...

  8. 40 CFR 86.1227-96 - Test procedures; overview.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 19 2010-07-01 2010-07-01 false Test procedures; overview. 86.1227-96 Section 86.1227-96 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Methanol-Fueled Heavy-Duty Vehicles § 86.1227-96 Test procedures; overview. (a) The overall test consists...

  9. 30 CFR 62.171 - Audiometric test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Audiometric test procedures. 62.171 Section 62.171 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR UNIFORM MINE HEALTH REGULATIONS OCCUPATIONAL NOISE EXPOSURE § 62.171 Audiometric test procedures. (a) All audiometric testing...

  10. Acceptance test procedure for shuttle actuators simulator (elevon subsystem)

    NASA Technical Reports Server (NTRS)

    Barr, J.

    1976-01-01

    The acceptance test procedure is described for the Lockheed Electronics Elevon Servoactuator Simulator to be used in the Shuttle Avionics Integration Laboratory (SAIL). The intent of this acceptance test procedure is to comply with the technical Shuttle Actuators Simulator Requirements. Acceptance tests will be performed on each Elevon Servoactuator Simulator.

  11. 40 CFR 60.93 - Test methods and procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false Test methods and procedures. 60.93... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of Performance for Hot Mix Asphalt Facilities § 60.93 Test methods and procedures. (a) In conducting the performance tests required in § 60.8...

  12. Light duty utility arm equipment qualification test procedure

    SciTech Connect

    Kiebel, G.R., Westinghouse Hanford

    1996-07-22

    The Equipment Qualification Test described in this test procedure document is the acceptance test procedure (ATP) for the LDUA Baseline System. It verifies that the equipment is complete and in working order, and demonstrates its readiness for being deployed into an actual underground storage tank.

  13. 40 CFR 60.547 - Test methods and procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Test methods and procedures. 60.547 Section 60.547 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Manufacturing Industry § 60.547 Test methods and procedures. (a) The test methods in appendix A to this part...

  14. 16 CFR § 1201.4 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... surrounded by at least one inch (2.5 centimeters) of water. (ii) Simulated weathering test. The equipment... thickness identical to those submitted for the impact test shall be used. (ii) Weathering tests—(A... examination as specified in paragraph (e)(2)(i) of this section. (ii) Accelerated weathering test. The...

  15. Testing in a combined vibration and acceleration environment.

    SciTech Connect

    Jepsen, Richard Alan; Romero, Edward F.

    2004-10-01

    Sandia National Laboratories has previously tested a capability to impose a 7.5 g-rms (30 g peak) radial vibration load up to 2 kHz on a 25 lb object with superimposed 50 g acceleration at its centrifuge facility. This was accomplished by attaching a 3,000 lb Unholtz-Dickie mechanical shaker at the end of the centrifuge arm to create a 'Vibrafuge'. However, the combination of non-radial vibration directions, and linear accelerations higher than 50g's are currently not possible because of the load capabilities of the shaker and the stresses on the internal shaker components due to the combined centrifuge acceleration. Therefore, a new technique using amplified piezo-electric actuators has been developed to surpass the limitations of the mechanical shaker system. They are lightweight, modular and would overcome several limitations presented by the current shaker. They are 'scalable', that is, adding more piezo-electric units in parallel or in series can support larger-weight test articles or displacement/frequency regimes. In addition, the units could be mounted on the centrifuge arm in various configurations to provide a variety of input directions. The design along with test results will be presented to demonstrate the capabilities and limitations of the new piezo-electric Vibrafuge.

  16. Accelerated Creep Testing of High Strength Aramid Webbing

    NASA Technical Reports Server (NTRS)

    Jones, Thomas C.; Doggett, William R.; Stnfield, Clarence E.; Valverde, Omar

    2012-01-01

    A series of preliminary accelerated creep tests were performed on four variants of 12K and 24K lbf rated Vectran webbing to help develop an accelerated creep test methodology and analysis capability for high strength aramid webbings. The variants included pristine, aged, folded and stitched samples. This class of webbings is used in the restraint layer of habitable, inflatable space structures, for which the lifetime properties are currently not well characterized. The Stepped Isothermal Method was used to accelerate the creep life of the webbings and a novel stereo photogrammetry system was used to measure the full-field strains. A custom MATLAB code is described, and used to reduce the strain data to produce master creep curves for the test samples. Initial results show good correlation between replicates; however, it is clear that a larger number of samples are needed to build confidence in the consistency of the results. It is noted that local fiber breaks affect the creep response in a similar manner to increasing the load, thus raising the creep rate and reducing the time to creep failure. The stitched webbings produced the highest variance between replicates, due to the combination of higher local stresses and thread-on-fiber damage. Large variability in the strength of the webbings is also shown to have an impact on the range of predicted creep life.

  17. Accelerated aging test results for aerospace wire insulation constructions

    NASA Technical Reports Server (NTRS)

    Dunbar, William G.

    1995-01-01

    Several wire insulation constructions were evaluated with and without continuous glow discharges at low pressure and high temperature to determine the aging characteristics of acceptable wire insulation constructions. It was known at the beginning of the test program that insulation aging takes several years when operated at normal ambient temperature and pressure of 20 C and 760 torr. Likewise, it was known that the accelerated aging process decreases insulation life by approximately 50% for each 10 C temperature rise. Therefore, the first phases of the program, not reported in these test results, were to select wire insulation constructions that could operate at high temperature and low pressure for over 10,000 hours with negligible shrinkage and little materials' deterioration.The final phase of the program was to determine accelerated aging characteristics. When an insulation construction is subjected to partial discharges the insulation is locally heated by the bombardment of the discharges, the insulation is also subjected to ozone and other deteriorating gas particles that may significantly increase the aging process. Several insulation systems using either a single material or combinations of teflon, kapton, and glass insulation constructions were tested. All constructions were rated to be partial discharge and/or corona-free at 240 volts, 400 Hz and 260 C (500 F) for 50, 000 hours at altitudes equivalent to the Paschen law. Minimum partial discharge aging tests were preceded by screening tests lasting 20 hours at 260 C. The aging process was accelerated by subjecting the test articles to temperatures up to 370 C (700 F) with and without partial discharges. After one month operation with continuous glow discharges surrounding the test articles, most insulation systems were either destroyed or became brittle, cracked, and unsafe for use. Time with space radiation as with partial discharges is accumulative.

  18. New and rapid analytical procedure for water content determination: microwave accelerated Dean-Stark.

    PubMed

    Veillet, Sébastien; Tomao, Valérie; Visinoni, Franco; Chemat, Farid

    2009-01-26

    Development of new procedures in analytical chemistry is currently increasingly focussed on reducing the time, cost and energy to carry out routine analyses. The conventional Dean-Stark (CDS) distillation to determine the water content is one of the most commonly used analytical methods and uses large amounts of solvent and energy. A new microwave accelerated Dean-Stark (MADS) distillation is presented as an alternative procedure. Microwaves were applied to a mixture of toluene, Weflon stir bar and olives, and the corresponding water was collected in a Dean-Stark receiver. This procedure permits fast and efficient determination of the water content of olives. Reliability and reproducibility were evaluated using statistical analyses. Different matrices were then used with MADS and the results were compared to CDS. Water determination from olives with MADS was better than that with CDS in terms of energy saving, rapidity (10 min versus 120 min), reproducibility, and cleanliness.

  19. Technical Note: Mobile accelerator guidance using an optical tracker during docking in IOERT procedures.

    PubMed

    Marinetto, Eugenio; Victores, Juan González; García-Sevilla, Mónica; Muñoz, Mercedes; Calvo, Felipe Ángel; Balaguer, Carlos; Desco, Manuel; Pascau, Javier

    2017-07-24

    Intraoperative electron radiation therapy (IOERT) involves the delivery of a high radiation dose during tumor resection in a shorter time than other radiation techniques, thus improving local control of tumors. However, a linear accelerator device is needed to produce the beam safely. Mobile linear accelerators have been designed as dedicated units that can be moved into the operating room and deliver radiation in situ. Correct and safe dose delivery is a key concern when using mobile accelerators. The applicator is commonly fixed to the patient's bed to ensure that the dose is delivered to the prescribed location, and the mobile accelerator is moved to dock the applicator to the radiation beam output (gantry). In a typical clinical set-up, this task is time-consuming because of safety requirements and the limited degree of freedom of the gantry. The objective of this study was to present a navigation solution based on optical tracking for guidance of docking to improve safety and reduce procedure time. We used an optical tracker attached to the mobile linear accelerator to track the prescribed localization of the radiation collimator inside the operating room. Using this information, the integrated navigation system developed computes the movements that the mobile linear accelerator needs to perform to align the applicator and the radiation gantry and warns the physician if docking is unrealizable according to the available degrees of freedom of the mobile linear accelerator. Furthermore, we coded a software application that connects all the necessary functioning elements and provides a user interface for the system calibration and the docking guidance. The system could safeguard against the spatial limitations of the operating room, calculate the optimal arrangement of the accelerator and reduce the docking time in computer simulations and experimental setups. The system could be used to guide docking with any commercial linear accelerator. We believe that the

  20. Lifetime Prediction for Degradation of Solar Mirrors using Step-Stress Accelerated Testing (Presentation)

    SciTech Connect

    Lee, J.; Elmore, R.; Kennedy, C.; Gray, M.; Jones, W.

    2011-09-01

    This research is to illustrate the use of statistical inference techniques in order to quantify the uncertainty surrounding reliability estimates in a step-stress accelerated degradation testing (SSADT) scenario. SSADT can be used when a researcher is faced with a resource-constrained environment, e.g., limits on chamber time or on the number of units to test. We apply the SSADT methodology to a degradation experiment involving concentrated solar power (CSP) mirrors and compare the results to a more traditional multiple accelerated testing paradigm. Specifically, our work includes: (1) designing a durability testing plan for solar mirrors (3M's new improved silvered acrylic "Solar Reflector Film (SFM) 1100") through the ultra-accelerated weathering system (UAWS), (2) defining degradation paths of optical performance based on the SSADT model which is accelerated by high UV-radiant exposure, and (3) developing service lifetime prediction models for solar mirrors using advanced statistical inference. We use the method of least squares to estimate the model parameters and this serves as the basis for the statistical inference in SSADT. Several quantities of interest can be estimated from this procedure, e.g., mean-time-to-failure (MTTF) and warranty time. The methods allow for the estimation of quantities that may be of interest to the domain scientists.

  1. 40 CFR 86.1427 - Certification Short Test procedure; overview.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...-Cycle Light-Duty Trucks; Certification Short Test Procedures § 86.1427 Certification Short Test... CO fuel, a moderate temperature test with Cold CO fuel, and a warm temperature test with FTP Otto-cycle test fuel, as described in table O-96-1 of § 86.1430. The manufacturer must complete testing...

  2. 40 CFR 86.1427 - Certification Short Test procedure; overview.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...-Cycle Light-Duty Trucks; Certification Short Test Procedures § 86.1427 Certification Short Test... CO fuel, a moderate temperature test with Cold CO fuel, and a warm temperature test with FTP Otto-cycle test fuel, as described in table O-96-1 of § 86.1430. The manufacturer must complete testing...

  3. 46 CFR 164.008-3 - Testing procedure.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...: SPECIFICATIONS AND APPROVAL MATERIALS Bulkhead Panels § 164.008-3 Testing procedure. (a) Tests. All tests... designated by the Coast Guard. (b) Preparation of test specimen. (1) The test specimens shall be conditioned... such that there is no possibility of misinterpretation of test results due to the passage of flame...

  4. Plasma Wakefield Acceleration and FACET - Facilities for Accelerator Science and Experimental Test Beams at SLAC

    ScienceCinema

    Andrei Seryi

    2016-07-12

    Plasma wakefield acceleration is one of the most promising approaches to advancing accelerator technology. This approach offers a potential 1,000-fold or more increase in acceleration over a given distance, compared to existing accelerators.  FACET, enabled by the Recovery Act funds, will study plasma acceleration, using short, intense pulses of electrons and positrons. In this lecture, the physics of plasma acceleration and features of FACET will be presented.  

  5. Braking, Wheeled Vehicles. Test Operations Procedure (TOP)

    DTIC Science & Technology

    2008-05-20

    of snubs and overall brake temperature rise are recorded and used to determine the effectiveness of the braking device. 4.3 Endurance/Durability...TOP 2-2-608 20 May 2008 17 d. Test duration. e. Brake control force, if required. f. Brake temperature , if required. g. Comments...g. Brake temperature rise . h. Number of brake snubs per test run. 5.3 Endurance /Durability Testing. 5.3.1 Structural Integrity. a

  6. Test procedure for boxed waste assay system

    SciTech Connect

    Wachter, J.

    1994-12-07

    This document, prepared by Los Alamos National Laboratory`s NMT-4 group, details the test methodology and requirements for Acceptance/Qualification testing of a Boxed Waste Assay System (BWAS) designed and constructed by Pajarito Scientific Corporation. Testing of the BWAS at the Plutonium Facility (TA55) at Los Alamos National Laboratory will be performed to ascertain system adherence to procurement specification requirements. The test program shall include demonstration of conveyor handling capabilities, gamma ray energy analysis, and imaging passive/active neutron accuracy and sensitivity. Integral to these functions is the system`s embedded operating and data reduction software.

  7. Test Sequence for Superconducting XFEL Cavities in the Accelerator Module Test Facility (AMTF) at DESY

    NASA Astrophysics Data System (ADS)

    Schaffran, J.; Petersen, B.; Reschke, D.; Swierblewski, J.

    The European XFEL is a new research facility currently under construction at DESY in the Hamburg area in Germany. From 2016 onwards, it will generate extremely intense X-ray flashes that will be used by researchers from all over the world. The main part of the superconducting European XFEL linear accelerator consists of 100 accelerator modules with 800 RF-cavities inside. The accelerator modules, superconducting magnets and cavities will be tested in the accelerator module test facility (AMTF) at DESY. This paper gives an overview of the test sequences for the superconducting cavities, applied in the preparation area and at the two cryostats (XATC) of the AMTF-hall, and describes the complete area. In addition it summarizes the tests and lessons learnt until the middle of 2014.

  8. Accelerated Life Tests under Competing Weibull Causes of Failure.

    DTIC Science & Technology

    1981-06-01

    rj denote the number of systems which fail from cause j at stress V , j = 1, ..., p, i = 1, ..., s. The Ni items on test at stress Vi, i = 1, ..., s...A-f-AI02 560 MISSOU UMIV-COLUMBIA DEPT OF STATISTICS F/6 2/ ACCELERATED LIFE TESTS UNDER COMPETING WEIBULL CAUSES OF FAILUR.-ETC(U) N J 81 J P KLEIN... Causes of Failure by John P. Klein Department of Statistics, Ohio State University Asit P Basu Department of Statistics, University of Missouri

  9. GTA (ground test accelerator) Phase 1: Baseline design report

    SciTech Connect

    Not Available

    1986-08-01

    The national Neutral Particle Beam (NPB) program has two objectives: to provide the necessary basis for a discriminator/weapon decision by 1992, and to develop the technology in stages that lead ultimately to a neutral particle beam weapon. The ground test accelerator (GTA) is the test bed that permits the advancement of the state-of-the-art under experimental conditions in an integrated automated system mode. An intermediate goal of the GTA program is to support the Integrated Space Experiments, while the ultimate goal is to support the 1992 decision. The GTA system and each of its major subsystems are described, and project schedules and resource requirements are provided. (LEW)

  10. 40 CFR 53.23 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... analog signal output, connect an integrating-type digital meter (DM) suitable for the test analyzer's... interruption occurred shall be repeated. (6) During each test block, manual adjustments to the electronics, gas... least 10 centimeters per hour (or equivalent resolution for a digital representation) shall be used...

  11. 16 CFR 1610.6 - Test procedure.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... specimen. The carriage shall be drawn forward by hand once against the lay of the surface fibers at a... test within 45 seconds of the time the specimen was removed from the desiccator. Activate the trigger... smoke produced during the test. (7) Record the burn time (reading of the timer) for each specimen, along...

  12. 40 CFR 91.607 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... information needed to establish an alternate minimum idle speed. The Administrator, in making or specifying... normal production engines. This service accumulation must be consistent with the new engine break-in... comply with the test order. If no test cells are available at a desired facility, the manufacturer must...

  13. 40 CFR 91.607 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... information needed to establish an alternate minimum idle speed. The Administrator, in making or specifying... normal production engines. This service accumulation must be consistent with the new engine break-in... comply with the test order. If no test cells are available at a desired facility, the manufacturer must...

  14. 40 CFR 90.508 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Administrator, in making or specifying these adjustments, may consider the effect of the deviation from the... with the new engine break-in instructions contained in the applicable owner's manual. (2) The... comply with the test order. If no test cells are available at a desired facility, the manufacturer must...

  15. 40 CFR 90.508 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Administrator, in making or specifying these adjustments, may consider the effect of the deviation from the... with the new engine break-in instructions contained in the applicable owner's manual. (2) The... comply with the test order. If no test cells are available at a desired facility, the manufacturer must...

  16. 40 CFR 91.607 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... information needed to establish an alternate minimum idle speed. The Administrator, in making or specifying... normal production engines. This service accumulation must be consistent with the new engine break-in... comply with the test order. If no test cells are available at a desired facility, the manufacturer must...

  17. Procedural Variation in Behavioral Avoidance Tests

    ERIC Educational Resources Information Center

    Bernstein, Douglas A.; Nietzel, Michael T.

    1973-01-01

    The data on approach to snakes provides srong support for the contention that the behavorial avoidance test is not immune to bias introduced by the operation of situational variables that have usually been allowed to vary in uncontrolled fashion in psychotherapy analogue research. Behavior of test subjects can be influenced not only in terms of…

  18. Manual of Testing Procedures: Spring 1975.

    ERIC Educational Resources Information Center

    Stanford Research Inst., Menlo Park, CA.

    This manual is designed to assist personnel involved in work with the Stanford Research Institute (SRI) Follow Through Evaluation testing program. Follow Through is a number of planned education programs for children in kindergarten and primary grades (1-3). Job descriptions for each person working in the testing program are included. In addition,…

  19. 16 CFR 1615.4 - Test procedure.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...) Apparatus—(1) Test chamber. The test chamber shall be a steel cabinet with inside dimensions of 32.9 cm... width are approximately 2.5 cm. (1 in.) less than the cabinet floor dimensions. The cabinet to be used... level of fire safety to the consumer. Alternate sampling plans submitted for approval shall have...

  20. 16 CFR 1615.4 - Test procedure.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...) Apparatus—(1) Test chamber. The test chamber shall be a steel cabinet with inside dimensions of 32.9 cm. (12... width are approximately 2.5 cm. (1 in.) less than the cabinet floor dimensions. The cabinet to be used... level of fire safety to the consumer. Alternate sampling plans submitted for approval shall have...

  1. The Accelerator Production of Tritium Materials Test Program

    SciTech Connect

    Maloy, Stuart A.; Sommer, Walter F.; James, Michael R.; Romero, Tobias J.; Lopez, Manuel R.; Zimmermann, Eugene; Ledbetter, James M.

    2000-10-15

    A materials qualification program has been developed to irradiate and test candidate materials (alloy 718, Type 316L, and Type 304L stainless steel, modified Fe9Cr-1Mo(T91), Al-6061-T6, and Al-5052-O) for use in the Accelerator Production of Tritium (APT) target and blanket. The irradiations were performed in prototypic proton and neutron spectra at prototypic temperatures (50 to 160 deg. C). The study used the 800-MeV, 1.0-mA proton accelerator at the Los Alamos Neutron Science Center, which produces a Gaussian beam with 2 sigma = 3 cm. The experiment geometry is arranged to contain near-prototypic modules of the tungsten neutron source and the lead and aluminum blanket as well as mechanical test specimens of candidate APT materials. The particle spectrum varies throughout the irradiation volume; specimens are exposed to protons and a variety of mixed proton and neutron spectra, depending on the specimen's position relative to the beam center. These specimens have been irradiated for >3600 h to a maximum proton fluence of 4 x 10{sup 21} p/cm{sup 2} in the center of the proton beam. Specimens will yield data on the effect of proton irradiation, to high dose, on material properties from tensile tests, three-point bend tests, fracture toughness tests, pressurized tubes, U-bend stress corrosion cracking specimens, corrosion measurements, and microstructural characterization using transmission electron microscopy specimens. Results from these studies are applicable to all spallation neutron sources now in operation and under consideration, including the Spallation Neutron Source, the European Spallation Source, and The Accelerator Transmutation of Waste project.

  2. Ultra-accelerated natural sunlight exposure testing facilities

    DOEpatents

    Lewandowski, Allan A.; Jorgensen, Gary J.

    2003-08-12

    A multi-faceted concentrator apparatus for providing ultra-accelerated natural sunlight exposure testing for sample materials under controlled weathering conditions comprising: facets that receive incident natural sunlight, transmits VIS/NIR and reflects UV/VIS to deliver a uniform flux of UV/VIS onto a sample exposure plane located near a center of a facet array in chamber means that provide concurrent levels of temperature and/or relative humidity at high levels of up to 100.times. of natural sunlight that allow sample materials to be subjected to accelerated irradiance exposure factors for a significant period of time of about 3 to 10 days to provide a corresponding time of about at least a years worth representative weathering of sample materials.

  3. Ultra-Accelerated Natural Sunlight Exposure Testing Facilities

    DOEpatents

    Lewandowski, Allan A.; Jorgensen, Gary J.

    2004-11-23

    A multi-faceted concentrator apparatus for providing ultra-accelerated natural sunlight exposure testing for sample materials under controlled weathering conditions comprising: facets that receive incident natural sunlight, transmits VIS/NIR and reflects UV/VIS onto a secondary reflector that delivers a uniform flux of UV/VIS onto a sample exposure plane located near a center of a facet array in a chamber that provide concurrent levels of temperature and/or relative humidity at high levels of up to 100.times. of natural sunlight that allow sample materials to be subjected to accelerated irradiance exposure factors for a significant period of time of about 3 to 10 days to provide a corresponding time of about at least a years worth representative weathering of sample materials.

  4. Vibrational measurement for commissioning SRF Accelerator Test Facility at Fermilab

    SciTech Connect

    McGee, M.W.; Leibfritz, J.; Martinez, A.; Pischalnikov, Y.; Schappert, W.; /Fermilab

    2011-03-01

    The commissioning of two cryomodule components is underway at Fermilab's Superconducting Radio Frequency (SRF) Accelerator Test Facility. The research at this facility supports the next generation high intensity linear accelerators such as the International Linear Collider (ILC), a new high intensity injector (Project X) and other future machines. These components, Cryomodule No.1 (CM1) and Capture Cavity II (CC2), which contain 1.3 GHz cavities are connected in series in the beamline and through cryogenic plumbing. Studies regarding characterization of ground motion, technical and cultural noise continue. Mechanical transfer functions between the foundation and critical beamline components have been measured and overall system displacement characterized. Baseline motion measurements given initial operation of cryogenic, vacuum systems and other utilities are considered.

  5. Database requirements for the Advanced Test Accelerator project

    SciTech Connect

    Chambers, F.W.

    1984-11-05

    The database requirements for the Advanced Test Accelerator (ATA) project are outlined. ATA is a state-of-the-art electron accelerator capable of producing energetic (50 million electron volt), high current (10,000 ampere), short pulse (70 billionths of a second) beams of electrons for a wide variety of applications. Databasing is required for two applications. First, the description of the configuration of facility itself requires an extended database. Second, experimental data gathered from the facility must be organized and managed to insure its full utilization. The two applications are intimately related since the acquisition and analysis of experimental data requires knowledge of the system configuration. This report reviews the needs of the ATA program and current implementation, intentions, and desires. These database applications have several unique aspects which are of interest and will be highlighted. The features desired in an ultimate database system are outlined. 3 references, 5 figures.

  6. Commissioning of the Ground Test Accelerator Intertank Matching Section

    SciTech Connect

    Johnson, K.F.; Sander, O.R.; Atkins, W.H.; Bolme, G.O.; Cole, R.; Connolly, R.; Gilpatrick, J.D.; Ingalls, W.B.; Kersteins, D.; Little, C.; Lohsen, R.A.; Lysenko, W.P.; Mottershead, C.T.; Power, J.; Rusthoi, D.P.; Sandoval, D.P.; Stevens, R.R.; Vaughn, G.; Wadlinger, E.A.; Weiss, R.; Yuan, V.

    1992-09-01

    The Ground Test Accelerator (GTA) has the objective of verifying much of the technology (physics and engineering) required for producing high-brightness, high-current H{sup {minus}} beams. GTA commissioning is staged to verify the beam dynamics design of each major accelerator component as it is brought on-line. The commissioning stages are the 35 keV H{sup {minus}} injector, the 2.5 MeV Radio Frequency Quadrupole (RFQ), the Intertank Matching Section (IMS), the 3.2 MeV first 2{beta}{gamma} Drift Tube Linac (DTL-1) module, the 8.7 MeV 2{beta}{gamma} DTL (modules 1--5), and the 24 MeV GTA; all 10 DTL modules. Commissioning results from the IMS beam experiments will be presented.

  7. Commissioning of the Ground Test Accelerator Intertank Matching Section

    SciTech Connect

    Johnson, K.F.; Sander, O.R.; Atkins, W.H.; Bolme, G.O.; Cole, R.; Connolly, R.; Gilpatrick, J.D.; Ingalls, W.B.; Kersteins, D.; Little, C.; Lohsen, R.A.; Lysenko, W.P.; Mottershead, C.T.; Power, J.; Rusthoi, D.P.; Sandoval, D.P.; Stevens, R.R.; Vaughn, G.; Wadlinger, E.A.; Weiss, R.; Yuan, V.

    1992-01-01

    The Ground Test Accelerator (GTA) has the objective of verifying much of the technology (physics and engineering) required for producing high-brightness, high-current H{sup {minus}} beams. GTA commissioning is staged to verify the beam dynamics design of each major accelerator component as it is brought on-line. The commissioning stages are the 35 keV H{sup {minus}} injector, the 2.5 MeV Radio Frequency Quadrupole (RFQ), the Intertank Matching Section (IMS), the 3.2 MeV first 2{beta}{gamma} Drift Tube Linac (DTL-1) module, the 8.7 MeV 2{beta}{gamma} DTL (modules 1--5), and the 24 MeV GTA; all 10 DTL modules. Commissioning results from the IMS beam experiments will be presented.

  8. Military Publications, Index of Test Operations Procedures

    DTIC Science & Technology

    1981-10-01

    COMMUNICATION EQUIPMENT 3-14 TECOM Pam 310-4 AD NO DATE MTP/TOP NO TITLE 867176 7 NOV 69 6-2-535 (L) FUNGUS TEST 866904 30 DEC 69 6-2-540 (L...Field) Environmental Testing of Communication, Surveillance, and Avionic Electronic Equipment 6-4-001 Electrical Power Requirements 6-2-514 Fungus ...Equipment 6-2-521 Frequency Accuracy and Stability 6-2-517 Fungus Test 6-2-535 Maintenance/Maintainability 6-2-504 Reliability 6-2-503 Safety 6-2-507 Shock

  9. Test procedures for severely aspheric optics

    NASA Astrophysics Data System (ADS)

    Freeman, Michael H.; Gray, Caroline

    1996-08-01

    Severely aspheric lenses have surfaces which depart from spherical by millimeters rather than microns. Optical testing of these lenses can be achieved using aspheric null mirrors. Although such mirrors can give full null compensation at diffraction limited precision most severely aspheric lenses are made by molding for applications which allow many fringes of form error. Diamond turned aspheric null mirrors verified by Form Taysurf methods give a test lens plus mirror systems which can be tested using either interference or a less sensitive autocollimation or encircled energy method more economical and more appropriate to the quality required.

  10. Suggested Operating Procedures for Aquifer Pumping Tests

    EPA Pesticide Factsheets

    This document is intended as a primer, describing the process for the design and performance of an “aquifer test” (how to obtain reliable data from a pumping test) to obtain accurate estimates of aquifer parameters.

  11. Flexible Support Test Procedure and Results

    SciTech Connect

    Kurita, C.H.; /Fermilab

    1987-12-04

    Upon completion of the fabrication process, the four central calorimeter cryostat flexible support assemblies were sent to Construction Technology Laboratories (CTL) in Skokie, IL, where the required tests were performed for Richmond Lox prior to the installation of the stanchions in the cryostat. These tests were to simulate the simultaneous axial and transverse loading experienced by the stanchions when the cryostat undergoes the cool down process.

  12. Antimicrobial Testing Methods & Procedures: MB-17-03

    EPA Pesticide Factsheets

    Information about ATMP - SOP Neutralization Confirmation Procedures for the AOAC Use-dilution method (UDM), the AOAC Germicidal Spray Products as Disinfectants Test (GSPT) and the Disinfectant Towelette Test (DTT) - MB-17-03

  13. 40 CFR 60.154 - Test methods and procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of Performance for Sewage Treatment Plants § 60.154 Test methods and procedures. (a) In conducting the performance tests required in §...

  14. Integrated Performance Testing Workshop - Supplemental Materials (Scripts and Procedures)

    SciTech Connect

    Baum, Gregory A.

    2014-02-01

    A variety of performance tests are described relating to: Material Transfers; Emergency Evacuation; Alarm Response Assessment; and an Enhanced Limited Scope Performance Test (ELSPT). Procedures are given for: nuclear material physical inventory and discrepancy; material transfers; and emergency evacuation.

  15. 40 CFR 87.5 - Special test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) CONTROL OF AIR POLLUTION FROM AIRCRAFT AND AIRCRAFT ENGINES General Provisions § 87.5 Special test... susceptible to satisfactory testing by the procedures set forth herein. Prior to taking action on any...

  16. 49 CFR 572.154 - Thorax assembly and test procedure.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) Test procedure. (1) Soak the dummy in a controlled environment at any temperature between 20.6 and 22.2... period specified in this section. (2) The test dummy is clothed in a cotton-polyester based tight fitting...

  17. Acceptance Test Procedure for New Pumping Instrumentation & Control Skid V

    SciTech Connect

    KOCH, M.R.

    2000-08-14

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designated as ''V''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  18. 40 CFR 60.386 - Test methods and procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of Performance for Metallic Mineral Processing Plants § 60.386 Test methods and procedures. (a) In conducting the performance tests required...

  19. 40 CFR 60.133 - Test methods and procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... and Bronze Production Plants § 60.133 Test methods and procedures. (a) In conducting performance tests... cycle. The sampling time and sample volume for each run shall be at least 120 minutes and 1.80 dscm (63...

  20. 14 CFR 25.1045 - Cooling test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ....1045 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant Cooling § 25.1045 Cooling test procedures. (a... correspond to the applicable performance requirements. The cooling tests must be conducted with the...

  1. 14 CFR 34.62 - Test procedure (propulsion engines).

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... FUEL VENTING AND EXHAUST EMISSION REQUIREMENTS FOR TURBINE ENGINE POWERED AIRPLANES Test Procedures for Engine Exhaust Gaseous Emissions (Aircraft and Aircraft Gas Turbine Engines) § 34.62 Test...

  2. Accelerated stress testing of amorphous silicon solar cells

    NASA Technical Reports Server (NTRS)

    Stoddard, W. G.; Davis, C. W.; Lathrop, J. W.

    1985-01-01

    A technique for performing accelerated stress tests of large-area thin a-Si solar cells is presented. A computer-controlled short-interval test system employing low-cost ac-powered ELH illumination and a simulated a-Si reference cell (seven individually bandpass-filtered zero-biased crystalline PIN photodiodes) calibrated to the response of an a-Si control cell is described and illustrated with flow diagrams, drawings, and graphs. Preliminary results indicate that while most tests of a program developed for c-Si cells are applicable to a-Si cells, spurious degradation may appear in a-Si cells tested at temperatures above 130 C.

  3. Corticotomies as a surgical procedure to accelerate tooth movement during orthodontic treatment: A systematic review

    PubMed Central

    Fernández-Ferrer, Laura; Montiel-Company, José-María; Candel-Martí, Eugenia; Almerich-Silla, José-Manuel; Peñarrocha-Diago, Miguel

    2016-01-01

    Background One of the main aims of orthodontists is to reduce the treatment time as much as possible, particularly in view of the rise in demand for orthodontic treatment among adult patients. The objective of this systematic review was to examine the effectiveness of corticotomy as a surgical procedure that accelerates orthodontic tooth movement, together with its possible adverse effects. Material and Methods A systematic review of articles in 4 databases, Pubmed, Cochrane, Scopus and Embase, complemented by a manual search, identified 772 articles. The duplicates were eliminated and a critical reading of titles and abstracts led to the rejection of articles that did not meet the objectives of the review, leaving 69. After reading the full text of these articles, 49 were excluded because they did not meet the inclusion criteria. On applying the CONSORT criteria as a quality filter, a further 4 were eliminated due to low quality. Finally, 16 articles (4 systematic reviews and 12 controlled trials) were reviewed. Results All the studies agree that corticotomy prior to orthodontic treatment accelerates dental movement, reducing the treatment time. With regard to side-effects, no periodontal damage was found, although this was only studied in the short term. Conclusions The evidence regarding the results of corticotomy is limited, given the small number of quality clinical studies available. Before this procedure is included as a routine practice in dental surgeries, studies of higher methodological quality are required, studying a greater number of individuals and examining the possible long-term adverse effects and the cost/benefit of the procedure. Key words:Corticotomy, orthodontics, adults, accelerated tooth movement, osteotomy. PMID:27475698

  4. Improved Accelerated Stress Tests Based on Fuel Cell Vehicle Data

    SciTech Connect

    Patterson, Timothy; Motupally, Sathya

    2012-06-01

    UTC will led a top-tier team of industry and national laboratory participants to update and improve DOE’s Accelerated Stress Tests (AST’s) for hydrogen fuel cells. This in-depth investigation will focused on critical fuel cell components (e.g. membrane electrode assemblies - MEA) whose durability represented barriers for widespread commercialization of hydrogen fuel cell technology. UTC had access to MEA materials that had accrued significant load time under real-world conditions in PureMotion® 120 power plant used in transit buses. These materials are referred to as end-of-life (EOL) components in the rest of this document. Advanced characterization techniques were used to evaluate degradation mode progress using these critical cell components extracted from both bus power plants and corresponding materials tested using the DOE AST’s. These techniques were applied to samples at beginning-of-life (BOL) to serve as a baseline. These comparisons advised the progress of the various failure modes that these critical components were subjected to, such as membrane degradation, catalyst support corrosion, platinum group metal dissolution, and others. Gaps in the existing ASTs predicted the degradation observed in the field in terms of these modes were outlined. Using the gaps, new AST’s were recommended and tested to better reflect the degradation modes seen in field operation. Also, BOL components were degraded in a test vehicle at UTC designed to accelerate the bus field operation.

  5. Instrumentation for accelerated life tests of concentrator solar cells.

    PubMed

    Núñez, N; Vázquez, M; González, J R; Jiménez, F J; Bautista, J

    2011-02-01

    Concentrator photovoltaic is an emergent technology that may be a good economical and efficient alternative for the generation of electricity at a competitive cost. However, the reliability of these new solar cells and systems is still an open issue due to the high-irradiation level they are subjected to as well as the electrical and thermal stresses that they are expected to endure. To evaluate the reliability in a short period of time, accelerated aging tests are essential. Thermal aging tests for concentrator photovoltaic solar cells and systems under illumination are not available because no technical solution to the problem of reaching the working concentration inside a climatic chamber has been available. This work presents an automatic instrumentation system that overcomes the aforementioned limitation. Working conditions have been simulated by forward biasing the solar cells to the current they would handle at the working concentration (in this case, 700 and 1050 times the irradiance at one standard sun). The instrumentation system has been deployed for more than 10 000 h in a thermal aging test for III-V concentrator solar cells, in which the generated power evolution at different temperatures has been monitored. As a result of this test, the acceleration factor has been calculated, thus allowing for the degradation evolution at any temperature in addition to normal working conditions to be obtained.

  6. Instrumentation for accelerated life tests of concentrator solar cells

    NASA Astrophysics Data System (ADS)

    Núñez, N.; Vázquez, M.; González, J. R.; Jiménez, F. J.; Bautista, J.

    2011-02-01

    Concentrator photovoltaic is an emergent technology that may be a good economical and efficient alternative for the generation of electricity at a competitive cost. However, the reliability of these new solar cells and systems is still an open issue due to the high-irradiation level they are subjected to as well as the electrical and thermal stresses that they are expected to endure. To evaluate the reliability in a short period of time, accelerated aging tests are essential. Thermal aging tests for concentrator photovoltaic solar cells and systems under illumination are not available because no technical solution to the problem of reaching the working concentration inside a climatic chamber has been available. This work presents an automatic instrumentation system that overcomes the aforementioned limitation. Working conditions have been simulated by forward biasing the solar cells to the current they would handle at the working concentration (in this case, 700 and 1050 times the irradiance at one standard sun). The instrumentation system has been deployed for more than 10 000 h in a thermal aging test for III-V concentrator solar cells, in which the generated power evolution at different temperatures has been monitored. As a result of this test, the acceleration factor has been calculated, thus allowing for the degradation evolution at any temperature in addition to normal working conditions to be obtained.

  7. Improved Flight Test Procedures for Flutter Clearance

    NASA Technical Reports Server (NTRS)

    Lind, Rick C.; Brenner, Martin J.; Freudinger, Lawrence C.

    1997-01-01

    Flight flutter testing is an integral part of flight envelope clearance. This paper discusses advancements in several areas that are being investigated to improve efficiency and safety of flight test programs. Results are presented from recent flight testing of the F/A-18 Systems Research Aircraft. A wingtip excitation system was used to generate aeroelastic response data. This system worked well for many flight conditions but still displayed some anomalies. Wavelet processing is used to analyze the flight data. Filtered transfer functions are generated that greatly improve system identification. A flutter margin is formulated that accounts for errors between a model and flight data. Worst-case flutter margins are computed to demonstrate the flutter boundary may lie closer to the flight envelope than previously estimated. This paper concludes with developments for a distributed flight analysis environment and on-line health monitoring.

  8. Optimum Testing Procedures for System Diagnosis and Fault Isolation.

    DTIC Science & Technology

    1981-03-31

    fault detection and isolation procedures are directed...Conference, Vol. 32 (1968), pp. 529-534. 4. Cohn, H. Y. and Ott, G., "Design of Adaptive Procedures for Fault Detection and Isolation ," IEEE... detection and isolation Built-in-test Optimum sequenceof testing Branch-and Bound 20. ABSTRACT (Contin... on revera. .ide f nwcider’ and identify

  9. 40 CFR 86.342-79 - Post-test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Post-test procedures. (a) Begin a hang-up check within 30 seconds of the completion of the last mode in... 40 Protection of Environment 19 2013-07-01 2013-07-01 false Post-test procedures. 86.342-79..., or (b) Begin the analyzer span checks within 6 minutes after the completion of the last mode in the...

  10. 40 CFR 86.342-79 - Post-test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Post-test procedures. (a) Begin a hang-up check within 30 seconds of the completion of the last mode in... 40 Protection of Environment 19 2012-07-01 2012-07-01 false Post-test procedures. 86.342-79..., or (b) Begin the analyzer span checks within 6 minutes after the completion of the last mode in the...

  11. 40 CFR 60.344 - Test methods and procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false Test methods and procedures. 60.344 Section 60.344 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of Performance for Lime Manufacturing Plants § 60.344 Test methods and procedure...

  12. 40 CFR 60.123 - Test methods and procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false Test methods and procedures. 60.123 Section 60.123 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of Performance for Secondary Lead Smelters § 60.123 Test methods and procedures....

  13. 40 CFR 60.303 - Test methods and procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false Test methods and procedures. 60.303 Section 60.303 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of Performance for Grain Elevators § 60.303 Test methods and procedures. (a) In...

  14. 46 CFR 170.190 - Stability test procedure modifications.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Stability test procedure modifications. 170.190 Section 170.190 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SUBDIVISION AND STABILITY STABILITY REQUIREMENTS FOR ALL INSPECTED VESSELS Determination of Lightweight Displacement and Centers of Gravity § 170.190 Stability test procedure...

  15. 40 CFR 205.160-4 - Testing procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 25 2011-07-01 2011-07-01 false Testing procedures. 205.160-4 Section 205.160-4 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS TRANSPORTATION EQUIPMENT NOISE EMISSION CONTROLS Motorcycles § 205.160-4 Testing procedures. (a...

  16. 40 CFR 205.160-4 - Testing procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 25 2014-07-01 2014-07-01 false Testing procedures. 205.160-4 Section 205.160-4 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS TRANSPORTATION EQUIPMENT NOISE EMISSION CONTROLS Motorcycles § 205.160-4 Testing procedures. (a...

  17. 40 CFR 205.160-4 - Testing procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 26 2013-07-01 2013-07-01 false Testing procedures. 205.160-4 Section 205.160-4 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS TRANSPORTATION EQUIPMENT NOISE EMISSION CONTROLS Motorcycles § 205.160-4 Testing procedures. (a...

  18. 40 CFR 205.160-4 - Testing procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 26 2012-07-01 2011-07-01 true Testing procedures. 205.160-4 Section 205.160-4 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS TRANSPORTATION EQUIPMENT NOISE EMISSION CONTROLS Motorcycles § 205.160-4 Testing procedures. (a...

  19. 40 CFR 205.160-4 - Testing procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Testing procedures. 205.160-4 Section 205.160-4 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS TRANSPORTATION EQUIPMENT NOISE EMISSION CONTROLS Motorcycles § 205.160-4 Testing procedures. (a...

  20. 40 CFR 1066.15 - Overview of test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 34 2013-07-01 2013-07-01 false Overview of test procedures. 1066.15 Section 1066.15 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR POLLUTION CONTROLS VEHICLE-TESTING PROCEDURES Applicability and General Provisions § 1066.15 Overview of...

  1. 40 CFR 76.15 - Test methods and procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 17 2014-07-01 2014-07-01 false Test methods and procedures. 76.15 Section 76.15 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) ACID RAIN NITROGEN OXIDES EMISSION REDUCTION PROGRAM § 76.15 Test methods and procedures. (a) The...

  2. 40 CFR 76.15 - Test methods and procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Test methods and procedures. 76.15 Section 76.15 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) ACID RAIN NITROGEN OXIDES EMISSION REDUCTION PROGRAM § 76.15 Test methods and procedures. (a) The...

  3. 40 CFR 76.15 - Test methods and procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 17 2013-07-01 2013-07-01 false Test methods and procedures. 76.15 Section 76.15 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) ACID RAIN NITROGEN OXIDES EMISSION REDUCTION PROGRAM § 76.15 Test methods and procedures. (a) The...

  4. 40 CFR 76.15 - Test methods and procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 17 2012-07-01 2012-07-01 false Test methods and procedures. 76.15 Section 76.15 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) ACID RAIN NITROGEN OXIDES EMISSION REDUCTION PROGRAM § 76.15 Test methods and procedures. (a) The...

  5. 40 CFR 76.15 - Test methods and procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 16 2011-07-01 2011-07-01 false Test methods and procedures. 76.15 Section 76.15 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) ACID RAIN NITROGEN OXIDES EMISSION REDUCTION PROGRAM § 76.15 Test methods and procedures. (a) The...

  6. 14 CFR 34.62 - Test procedure (propulsion engines).

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Section 34.62 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT FUEL VENTING AND EXHAUST EMISSION REQUIREMENTS FOR TURBINE ENGINE POWERED AIRPLANES Test Procedures for Engine Exhaust Gaseous Emissions (Aircraft and Aircraft Gas Turbine Engines) § 34.62 Test procedure...

  7. 14 CFR 61.33 - Tests: General procedure.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 2 2014-01-01 2014-01-01 false Tests: General procedure. 61.33 Section 61.33 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED... procedure. Tests prescribed by or under this part are given at times and places, and by persons designated...

  8. 40 CFR 86.334-79 - Test procedure overview.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... New Gasoline-Fueled and Diesel-Fueled Heavy-Duty Engines; Gaseous Exhaust Test Procedures § 86.334-79... cycle and 1 hot cycle. The Diesel engine test consists of 3 idle modes and 5 power modes at each of 2 speeds which span the typical operating range of Diesel engines. These procedures require...

  9. 49 CFR 572.72 - Head assembly and test procedure.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Head assembly and test procedure. 572.72 Section...-Year-Old Child § 572.72 Head assembly and test procedure. (a) Head assembly. The head consists of the... on SA 106C 001, sheet 8. (b) Head assembly impact response requirements. When the head is impacted...

  10. 49 CFR 572.72 - Head assembly and test procedure.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Head assembly and test procedure. 572.72 Section...-Year-Old Child § 572.72 Head assembly and test procedure. (a) Head assembly. The head consists of the... on SA 106C 001, sheet 8. (b) Head assembly impact response requirements. When the head is impacted...

  11. 49 CFR 572.72 - Head assembly and test procedure.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Head assembly and test procedure. 572.72 Section...-Year-Old Child § 572.72 Head assembly and test procedure. (a) Head assembly. The head consists of the... on SA 106C 001, sheet 8. (b) Head assembly impact response requirements. When the head is impacted...

  12. Acceptance test procedure: RMW Land Disposal Facility Project W-025

    SciTech Connect

    Roscha, V.

    1994-12-12

    This ATP establishes field testing procedures to demonstrate that the electrical/instrumentation system functions as intended by design for the Radioactive Mixed Waste Land Disposal Facility. Procedures are outlined for the field testing of the following: electrical heat trace system; transducers and meter/controllers; pumps; leachate storage tank; and building power and lighting.

  13. 40 CFR 86.1427 - Certification Short Test procedure; overview.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... procedure; overview. (a) The test procedure described in this subpart is designed to measure raw... that may be encountered in the conduct of the Emission Control System Performance Warranty Short Tests... be approved in advance by the Administrator in accordance with the provisions of § 85.2208 of this...

  14. 32 CFR 245.30 - ESCAT test procedures restrictions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 2 2012-07-01 2012-07-01 false ESCAT test procedures restrictions. 245.30 Section 245.30 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY OF DEFENSE (CONTINUED) MISCELLANEOUS PLAN FOR THE EMERGENCY SECURITY CONTROL OF AIR TRAFFIC (ESCAT) Test Procedures...

  15. 32 CFR 245.30 - ESCAT test procedures restrictions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 2 2010-07-01 2010-07-01 false ESCAT test procedures restrictions. 245.30 Section 245.30 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY OF DEFENSE (CONTINUED) MISCELLANEOUS PLAN FOR THE EMERGENCY SECURITY CONTROL OF AIR TRAFFIC (ESCAT) Test Procedures...

  16. 32 CFR 245.30 - ESCAT test procedures restrictions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 2 2014-07-01 2014-07-01 false ESCAT test procedures restrictions. 245.30 Section 245.30 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY OF DEFENSE (CONTINUED) MISCELLANEOUS PLAN FOR THE EMERGENCY SECURITY CONTROL OF AIR TRAFFIC (ESCAT) Test Procedures...

  17. 32 CFR 245.30 - ESCAT test procedures restrictions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 2 2011-07-01 2011-07-01 false ESCAT test procedures restrictions. 245.30 Section 245.30 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY OF DEFENSE (CONTINUED) MISCELLANEOUS PLAN FOR THE EMERGENCY SECURITY CONTROL OF AIR TRAFFIC (ESCAT) Test Procedures...

  18. 32 CFR 245.30 - ESCAT test procedures restrictions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 2 2013-07-01 2013-07-01 false ESCAT test procedures restrictions. 245.30 Section 245.30 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY OF DEFENSE (CONTINUED) MISCELLANEOUS PLAN FOR THE EMERGENCY SECURITY CONTROL OF AIR TRAFFIC (ESCAT) Test Procedures...

  19. 40 CFR 211.212-4 - Testing procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Testing procedures. 211.212-4 Section 211.212-4 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS PRODUCT NOISE LABELING Hearing Protective Devices § 211.212-4 Testing procedures. (a)...

  20. 14 CFR 61.33 - Tests: General procedure.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Tests: General procedure. 61.33 Section 61.33 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED... procedure. Tests prescribed by or under this part are given at times and places, and by persons designated...

  1. 21 CFR 1010.13 - Special test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 8 2014-04-01 2014-04-01 false Special test procedures. 1010.13 Section 1010.13 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) RADIOLOGICAL HEALTH PERFORMANCE STANDARDS FOR ELECTRONIC PRODUCTS: GENERAL Alternate Test Procedures § 1010.13...

  2. 40 CFR 86.339-79 - Pre-test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 19 2013-07-01 2013-07-01 false Pre-test procedures. 86.339-79 Section 86.339-79 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Pre-test procedures. (a) Allow a minimum of 30 minutes warm-up in the stand-by or operating mode...

  3. 40 CFR 86.339-79 - Pre-test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 18 2010-07-01 2010-07-01 false Pre-test procedures. 86.339-79 Section 86.339-79 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Pre-test procedures. (a) Allow a minimum of 30 minutes warm-up in the stand-by or operating mode...

  4. 40 CFR 86.339-79 - Pre-test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 19 2012-07-01 2012-07-01 false Pre-test procedures. 86.339-79 Section 86.339-79 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Pre-test procedures. (a) Allow a minimum of 30 minutes warm-up in the stand-by or operating mode...

  5. 40 CFR 60.534 - Test methods and procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Wood Heaters § 60.534 Test methods and procedures. Test methods and procedures in appendix A of this...) Method 5H, if a stack location is used. (c) Method 28A shall be used to determine that a wood combustion unit qualifies under the definition of wood heater in § 60.531(a). If such a determination is necessary...

  6. 40 CFR 60.534 - Test methods and procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Wood Heaters § 60.534 Test methods and procedures. Test methods and procedures in appendix A of this...) Method 5H, if a stack location is used. (c) Method 28A shall be used to determine that a wood combustion unit qualifies under the definition of wood heater in § 60.531(a). If such a determination is necessary...

  7. 40 CFR 60.534 - Test methods and procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Wood Heaters § 60.534 Test methods and procedures. Test methods and procedures in appendix A of this...) Method 5H, if a stack location is used. (c) Method 28A shall be used to determine that a wood combustion unit qualifies under the definition of wood heater in § 60.531(a). If such a determination is necessary...

  8. 40 CFR 60.534 - Test methods and procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Wood Heaters § 60.534 Test methods and procedures. Test methods and procedures in appendix A of this...) Method 5H, if a stack location is used. (c) Method 28A shall be used to determine that a wood combustion unit qualifies under the definition of wood heater in § 60.531(a). If such a determination is necessary...

  9. 40 CFR 91.408 - Pre-test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 20 2011-07-01 2011-07-01 false Pre-test procedures. 91.408 Section 91...) CONTROL OF EMISSIONS FROM MARINE SPARK-IGNITION ENGINES Gaseous Exhaust Test Procedures § 91.408 Pre-test... accordance with § 91.117. (b) Engine pre-test preparation. (1) Drain and charge the fuel tank(s) with...

  10. 40 CFR 91.408 - Pre-test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 21 2012-07-01 2012-07-01 false Pre-test procedures. 91.408 Section 91...) CONTROL OF EMISSIONS FROM MARINE SPARK-IGNITION ENGINES Gaseous Exhaust Test Procedures § 91.408 Pre-test... accordance with § 91.117. (b) Engine pre-test preparation. (1) Drain and charge the fuel tank(s) with...

  11. 40 CFR 91.408 - Pre-test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 21 2013-07-01 2013-07-01 false Pre-test procedures. 91.408 Section 91...) CONTROL OF EMISSIONS FROM MARINE SPARK-IGNITION ENGINES Gaseous Exhaust Test Procedures § 91.408 Pre-test... accordance with § 91.117. (b) Engine pre-test preparation. (1) Drain and charge the fuel tank(s) with...

  12. A thermal vacuum test optimization procedure

    NASA Technical Reports Server (NTRS)

    Kruger, R.; Norris, H. P.

    1979-01-01

    An analytical model was developed that can be used to establish certain parameters of a thermal vacuum environmental test program based on an optimization of program costs. This model is in the form of a computer program that interacts with a user insofar as the input of certain parameters. The program provides the user a list of pertinent information regarding an optimized test program and graphs of some of the parameters. The model is a first attempt in this area and includes numerous simplifications. The model appears useful as a general guide and provides a way for extrapolating past performance to future missions.

  13. A new test procedure for biogenic sulfuric acid corrosion of concrete

    PubMed

    Vincke; Verstichel; Monteny; Verstraete

    1999-01-01

    A new test method is described for biogenic sulfuric acid corrosion of concrete, more specifically in sewer conditions. The aim of the new test method is the development of an accelerated and reproducible procedure for monitoring the resistance of different types of concrete with regard to biogenic sulfuric acid corrosion. This experimental procedure reflects worst case conditions by providing besides H2S, also an enrichment of thiobacilli and biologically produced sulfur. By simulating the cyclic processes occurring in sewer pipes, significant differences between concrete mixtures could be detected after 51 days. Concrete modified by a styrene-acrylic ester polymer demonstrated a higher resistance against biogenic sulfuric acid attack.

  14. 16 CFR 1631.4 - Test procedure.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... desiccant for 24 hours prior to use. (Small quantities of absorbed water may cause the tablets to fracture when first ignited. If a major fracture occurs, any results from that test shall be ignored, and it... of the Consumer Product Safety Commission is normally used for that type of carpet or rug in service...

  15. 16 CFR 1630.4 - Test procedure.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... to use. (Small quantities of absorbed water may cause the tablets to fracture when first ignited. If a major fracture occurs, any results from that test shall be ignored, and it shall be repeated.) (4... of the Consumer Product Safety Commission is normally used for that type of carpet or rug in service...

  16. 16 CFR 1631.4 - Test procedure.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... desiccant for 24 hours prior to use. (Small quantities of absorbed water may cause the tablets to fracture when first ignited. If a major fracture occurs, any results from that test shall be ignored, and it... of the Consumer Product Safety Commission is normally used for that type of carpet or rug in service...

  17. 16 CFR 1630.4 - Test procedure.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... to use. (Small quantities of absorbed water may cause the tablets to fracture when first ignited. If a major fracture occurs, any results from that test shall be ignored, and it shall be repeated.) (4... of the Consumer Product Safety Commission is normally used for that type of carpet or rug in service...

  18. 40 CFR 53.23 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... air and then a pollutant test gas concentration as indicated below. The noise specification in table B... the noise specification given in table B-1. (vii) Repeat steps (iii) through (vi) of this section... specification given in table B-1. (viii) Both S 0 and S 8 0 must be less than or equal to the specification for...

  19. Procedures for Criterion Referenced Tailored Testing.

    DTIC Science & Technology

    1981-08-01

    EISENHOWER AVENUE 5001 Eisenhower Avenue ALEXANDRIA, VA 22333 Alexandria, VA 22333 Dr. Milton S. Katz Training Technical Area U.S. Army Research Institute...Box 11A, Yale Station Educational Testing Service New Haven, CT 06520 Princeton, NJ 08540 DR. PATRICK SUPPES 1 Dr. Phyllis Weaver INSTITUTE FOR

  20. 40 CFR 53.43 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... multiplet population of the particle test atmosphere must not exceed 10 percent. (v) Introduce the particles.... Collect particles on appropriate filters (e.g., glass fiber) over a time period such that the relative... particles on an appropriate filter (e.g., glass fiber) for a time period such that the relative error of the...