Science.gov

Sample records for acceptance preliminary specification

  1. Plutonium Immobilization Can Loading Preliminary Specifications

    SciTech Connect

    Kriikku, E.

    1998-11-25

    This report discusses the Plutonium Immobilization can loading preliminary equipment specifications and includes a process block diagram, process description, equipment list, preliminary equipment specifications, plan and elevation sketches, and some commercial catalogs. This report identifies loading pucks into cans and backfilling cans with helium as the top priority can loading development areas.

  2. 76 FR 6459 - Mahoning Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-04

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Mahoning Hydropower, LLC; Notice of Preliminary Permit Application Accepted.... On December 30, 2010, Mahoning Hydropower, LLC filed an application for a preliminary...

  3. 76 FR 7838 - Mahoning Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-11

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Mahoning Hydropower, LLC; Notice of Preliminary Permit Application Accepted.... On December 30, 2010, Mahoning Hydropower, LLC filed an application for a preliminary...

  4. 75 FR 8320 - Coastal Hydropower LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-24

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Coastal Hydropower LLC; Notice of Preliminary Permit Application Accepted.... On November 5, 2009, Coastal Hydropower LLC filed an application for a preliminary permit,...

  5. 76 FR 67179 - Spartanburg Water System; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Spartanburg Water System; Notice of Preliminary Permit Application Accepted..., Spartanburg Water System (Spartanburg) filed an application for a preliminary permit, pursuant to section...

  6. 77 FR 16220 - Spartanburg Water System; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-20

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Spartanburg Water System; Notice of Preliminary Permit Application Accepted..., 2011, Spartanburg Water System (Spartanburg) filed an application for a preliminary permit, pursuant...

  7. 77 FR 41980 - Liberty University, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-17

    ... Energy Regulatory Commission Liberty University, Inc.; Notice of Preliminary Permit Application Accepted..., Liberty University, Inc., filed an application for a preliminary permit, pursuant to section 4(f) of the... Chancellor, Liberty University, 1971 University Blvd., Lynchburg, Virginia 24502; phone: (434)...

  8. 77 FR 61597 - Liberty University, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-10

    ... Energy Regulatory Commission Liberty University, Inc.; Notice of Preliminary Permit Application Accepted..., Liberty University, Inc., filed an application for a preliminary permit, pursuant to section 4(f) of the... Chancellor, Liberty University, 1971 University Blvd., Lynchburg, Virginia 24502; phone: (434)...

  9. 76 FR 24018 - Storage Development Partners, LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-29

    ... Federal Energy Regulatory Commission Storage Development Partners, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On April 1, 2011, Storage Development Partners, LLC, filed an application for a preliminary...

  10. 76 FR 24017 - Storage Development Partners, LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-29

    ... Energy Regulatory Commission Storage Development Partners, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On April 1, 2011, Storage Development Partners, LLC, filed an application for a preliminary permit, pursuant...

  11. Waste acceptance product specifications for vitrified high-level waste forms. Revision 1

    SciTech Connect

    Applewhite-Ramsey, A.; Sproull, J.F.

    1993-06-01

    The Nuclear Waste Policy Act of 1982 mandated that all high-level waste (HLW) be sent to a federal geologic repository for permanent disposal. DOE published the Environmental Assessment in 1982 which identified borosilicate glass as the chosen HLW form.{sup 1} In 1985 the Department of Energy instituted a Waste Acceptance Process to assure that DWPF glass waste forms would be acceptable to such a repository. This assurance was important since production of waste forms will precede repository construction and licensing. As part of this Waste Acceptance Process, the DOE Office of Civilian Radioactive Waste Management (RW) formed the Waste Acceptance Committee (WAC). The WAC included representatives from the candidate repository sites, the waste producing sites and DOE. The WAC was responsible for developing the Waste Acceptance Preliminary Specifications (WAPS) which defined the requirements the waste forms must meet to be compatible with the candidate repository geologies.

  12. 76 FR 1613 - Mahoning Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-11

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Mahoning Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications January 4,...

  13. 75 FR 12533 - The Power Company, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-16

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission The Power Company, Inc.; Notice of Preliminary Permit Application Accepted... Power Act, proposing to study the feasibility of the Damariscotta River Hydrokinetic Tidal...

  14. 75 FR 27769 - Mississippi 16 Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-18

    ... Energy Regulatory Commission Mississippi 16 Hydro, LLC; Notice of Preliminary Permit Application Accepted... April 5, 2010 Mississippi 16 Hydro, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Mississippi River...

  15. 75 FR 73066 - Qualified Hydro 35, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-29

    ... Energy Regulatory Commission Qualified Hydro 35, LLC; Notice of Preliminary Permit Application Accepted.... On October 15, 2010, Qualified Hydro 35, LLC filed an application for a preliminary permit, pursuant... Project would be 22,000 megawatt-hours. Applicant Contact: Ramya Swaminathan, Qualified Hydro 35, LLC,...

  16. 76 FR 70720 - KC LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-15

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission KC LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On October 11, 2011, KC LLC filed an application for a preliminary...

  17. 75 FR 78235 - Dodge Mill Realty, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-15

    ... Energy Regulatory Commission Dodge Mill Realty, LLC; Notice of Preliminary Permit Application Accepted.... On December 3, 2010, Dodge Mill Realty, LLC filed an application for a preliminary permit, pursuant... electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web...

  18. 75 FR 71106 - Deer Creek Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-22

    ... Energy Regulatory Commission Deer Creek Hydro, LLC; Notice of Preliminary Permit Application Accepted for... October 14, 2010, Deer Creek Hydro, LLC (Deer Creek Hydro) filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the...

  19. 75 FR 27768 - Current Connection, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-18

    ... Energy Regulatory Commission Current Connection, LLC; Notice of Preliminary Permit Application Accepted... March 30, 2010, Current Connection, LLC filed an application for a preliminary permit, pursuant to... annual generation of 155 gigawatt-hours. Applicant Contact: Timothy D. Smith, CEO, Current...

  20. 77 FR 26542 - Black Mountain Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-04

    ... Energy Regulatory Commission Black Mountain Hydro, LLC; Notice of Preliminary Permit Application Accepted..., Black Mountain Hydro, LLC, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Black Mountain Pumped...

  1. 78 FR 69080 - Houtama Hydropower LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-18

    ... Energy Regulatory Commission Houtama Hydropower LLC; Notice of Preliminary Permit Application Accepted..., 2013, Houtama Hydropower LLC filed an application for a preliminary permit, pursuant to section 4(f) of... Contact: Mr. William C. Hampton, CEO, Houtama Hydropower ] LLC, 1044 NW 12th Drive, Pendleton, OR...

  2. 77 FR 31349 - Coastal Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-25

    ... Energy Regulatory Commission Coastal Hydropower, LLC; Notice of Preliminary Permit Application Accepted..., Coastal Hydropower, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the... Contact: Neil Anderson, Coastal Hydropower, LLC, Key Centre, 601 108th Avenue NE., Suite 1900,...

  3. 77 FR 58375 - Inglis Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-20

    ... Energy Regulatory Commission Inglis Hydropower, LLC; Notice of Preliminary Permit Application Accepted..., Inglis Hydropower, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of a hydropower project located at the...

  4. 77 FR 15749 - Twin Lakes Canal Company; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-16

    ... Energy Regulatory Commission Twin Lakes Canal Company; Notice of Preliminary Permit Application Accepted..., Twin Lakes Canal Company filed an application for a successive preliminary permit, pursuant to section... gigawatt-hours, which would be sold to a local utility. Applicant Contact: Mr. Clair Boesen, Twin...

  5. 75 FR 49929 - Music Mountain Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-16

    ... Energy Regulatory Commission Music Mountain Hydro, LLC; Notice of Preliminary Permit Application Accepted.... On May 18, 2010, Music Mountain Hydro, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Music ] Mountain...

  6. 76 FR 30341 - Town of Edgartown; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-25

    ... Energy Regulatory Commission Town of Edgartown; Notice of Preliminary Permit Application Accepted for... Town of Edgartown, Massachusetts (Edgartown), filed an application for a successive preliminary permit.... The proposed project would consist of the following: (1) 13 Commercially operated OCGen\\TM\\...

  7. 78 FR 8512 - West Street Hydro, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-06

    ... Energy Regulatory Commission West Street Hydro, Inc.; Notice of Preliminary Permit Application Accepted..., 2012, West Street Hydro, Inc., filed an application for a preliminary permit, pursuant to section 4(f... megawatt-hours. Applicant Contact: Mr. Kenneth A. Stewart, West Street Hydro, Inc., 20 Central...

  8. 77 FR 36531 - Yegua Mesa Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-19

    ... Energy Regulatory Commission Yegua Mesa Hydro, LLC; Notice of Preliminary Permit Application Accepted for... Mesa Hydro, LLC, filed an application for a successive preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to continue studying the feasibility of the Yegua Mesa...

  9. 75 FR 28596 - Bryant Mountain LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-21

    ... Energy Regulatory Commission Bryant Mountain LLC; Notice of Preliminary Permit Application Accepted for..., 2010, Bryant Mountain LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Bryant Mountain Hydroelectric...

  10. 75 FR 11527 - KC Hydro LLC; Notice of Competing Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-11

    ... Energy Regulatory Commission KC Hydro LLC; Notice of Competing Preliminary Permit Application Accepted for Filing and Soliciting Comments March 4, 2010. On November 6, 2009, KC Hydro LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to...

  11. 78 FR 1853 - EH California Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-09

    ... Energy Regulatory Commission EH California Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments and Motions To Intervene On October 11, 2012, EH California Hydro, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power...

  12. 78 FR 27962 - Archon Energy 1, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-13

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Archon Energy 1, Inc.; Notice of Preliminary Permit Application Accepted for..., the Archon Energy 1, Inc., filed an application for a preliminary permit, pursuant to section 4(f)...

  13. 76 FR 21891 - Seneca Nation of Indians; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-19

    ... Energy Regulatory Commission Seneca Nation of Indians; Notice of Preliminary Permit Application Accepted..., 2011, the Seneca Nation of Indians filed an application for a preliminary permit, pursuant to section 4... owners' express permission. The Seneca Nation of Indians proposed project would consist of the...

  14. 76 FR 5585 - Idaho Irrigation District; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-01

    ... Energy Regulatory Commission Idaho Irrigation District; Notice of Preliminary Permit Application Accepted.... On November 12, 2010, the Idaho Irrigation District filed an application for a preliminary permit... Irrigation District Hydroelectric Project (project) to be located on the Idaho Canal, a tributary of...

  15. 76 FR 24014 - Renew Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-29

    ... Energy Regulatory Commission Renew Hydro, LLC; Notice of Preliminary Permit Application Accepted for..., Renew Hydro, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal... be 15,768,000 kilowatt-hours. Applicant Contact: John E. Marciszewski, General Manager, Renew...

  16. Performance-based waste acceptance criteria preliminary baseline assumptions

    SciTech Connect

    Not Available

    1994-10-24

    The Department of Energy`s (DOE`s) strategy for the management of transuranic (TRU) and TRU mixed wastes has focused on the development of the Waste Isolation Pilot Plant (WIPP). The WIPP repository is designated to receive DOE defense wastes that meet the established criteria for acceptance. As a national strategy [DOE, 1993], DOE does not intend to treat candidate wastes unless treatment or processing are necessary to meet the safety, health, and regulatory criteria for transport and disposal at WIPP. The WIPP WAC has evolved over the past 10 years to include criteria and requirements in support of the Waste Characterization program and other related compliance programs. In aggregate, the final health, safety and regulatory criteria for the waste will be documented in the Disposal WAC. This document serves two purposes. First, it familiarizes regulators and stakeholders with the concept of performance based waste acceptance criteria as an augmentation within a final Waste Isolation Pilot Plant (WIPP) Waste Acceptance Criteria. Second, the document preliminarily identifies certain waste characteristics that appear important to the performance assessment process for WIPP; therefore, these could become component characteristics in the Performance Based Waste Acceptance Criteria (PBWAC). Identification of the final PBWAC will be accomplished through iterative runs of the System Prioritization Method (SPM). These iterations will serve to more clearly isolate and identify those waste characteristics that directly and predominately impact on the performance assessment.

  17. Student Acceptance of the TICCIT System: A Preliminary Study.

    ERIC Educational Resources Information Center

    Asay, Calvin S.; Schneider, Edward W.

    Twenty male and female students from a high school psychology class participated in a formative evaluation of student acceptance and performance with the Primary Instruction Logic of the TICCIT delivery system. A secondary goal was a pilot effort to design a carrel that would optimize certain parameters of the physical/environmental conditions…

  18. Smart Home Technologies: Insights into Generation-Specific Acceptance Motives

    NASA Astrophysics Data System (ADS)

    Gaul, Sylvia; Ziefle, Martina

    In this research we examine the generation specific acceptance motives of eHealth technologies in order to assess the likelihood of success for these new technologies. 280 participants (14 - 92 years of age) volunteered to participate in a survey, in which using motives and barriers toward smart home technologies were explored. The scenario envisaged was the use of a medical stent implemented into the body, which monitors automatically the health status and which is able to remotely communicate with the doctor. Participants were asked to evaluate the pros and cons of the usage of this technology, their acceptance motives and potential utilization barriers. In order to understand the complex nature of acceptance, personal variables (age, technical expertise, health status), individual's cognitive concepts toward ageing as well as perceived usefulness were related. Outcomes show that trust, believe in the reliability of technology, privacy and security as well as intimacy facets are essential for acceptance and should be considered in order to proactively design a successful rollout of smart home technologies.

  19. 76 FR 12102 - Pacific Gas and Electric Company; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-04

    ... Gas and Electric Company; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions to Intervene, and Competing Applications On January 31, 2011, Pacific Gas and Electric.... The proposed project would consist of the following: (1) A new single-unit powerhouse with a...

  20. 78 FR 45523 - Davis Hydro, LLC Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-29

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Davis Hydro, LLC Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On June 4, 2013, the Davis Hydro, LLC, filed an application for...

  1. 78 FR 78354 - Borough of Weatherly; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-26

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Borough of Weatherly; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On November 4, 2013, the Borough of Weatherly (Borough)...

  2. 78 FR 78353 - Hydro Green Energy, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-26

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Hydro Green Energy, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On August 15, 2013, Hydro Green Energy, LLC, filed...

  3. 76 FR 30327 - Reliable Storage 1 LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-25

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Reliable Storage 1 LLC; Notice of Preliminary Permit Application Accepted..., Reliable Storage 1 LLC filed an application, pursuant to section 4(f) of the Federal Power Act,...

  4. 76 FR 45252 - Reliable Storage 1 LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-28

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Reliable Storage 1 LLC; Notice of Preliminary Permit Application Accepted..., Reliable Storage 1 LLC, filed an application, pursuant to section 4(f) of the Federal Power Act,...

  5. 76 FR 45251 - Reliable Storage 1 LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-28

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Reliable Storage 1 LLC; Notice of Preliminary Permit Application Accepted..., Reliable Storage 1 LLC, filed an application, pursuant to section 4(f) of the Federal Power Act,...

  6. 76 FR 30339 - Reliable Storage 1 LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-25

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Reliable Storage 1 LLC; Notice of Preliminary Permit Application Accepted..., Reliable Storage 1 LLC filed an application, pursuant to section 4(f) of the Federal Power Act,...

  7. 76 FR 30340 - Reliable Storage 1 LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-25

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Reliable Storage 1 LLC; Notice of Preliminary Permit Application Accepted..., Reliable Storage 1 LLC filed an application, pursuant to section 4(f) of the Federal Power Act,...

  8. 77 FR 9229 - Reliable Storage 1 LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-16

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Reliable Storage 1 LLC; Notice of Preliminary Permit Application Accepted..., Reliable Storage 1 LLC filed an application, pursuant to section 4(f) of the Federal Power Act,...

  9. 75 FR 59707 - Coastal Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-28

    ... Energy Regulatory Commission Coastal Hydropower, LLC; Notice of Preliminary Permit Application Accepted..., 2010. On February 9, 2010, and supplemented on July 16, 2010, Coastal Hydropower, LLC filed an...-hours. Applicant Contact: Neil Anderson, Coastal Hydropower, LLC, Key Centre, 601 108th Avenue,...

  10. 76 FR 43998 - Amnor Hydro West Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-22

    ... Energy Regulatory Commission Amnor Hydro West Inc.; Notice of Preliminary Permit Application Accepted for... supplemented on April 25, 2011, May 3, 2011, and July 6, 2011, Amnor Hydro West Inc. filed an application for a... feasibility of the Horn Rapids Dam Hydropower Project (Horn Rapids Project or project). The proposed...

  11. 78 FR 25263 - Hydrodynamics, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-30

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Hydrodynamics, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On February 1, 2013, Hydrodynamics, Inc. filed an...

  12. 77 FR 29634 - Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-18

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications; Corral Creek South Hydro, LLC On April 3, 2012, Corral Creek South Hydro, LLC, filed...

  13. 78 FR 7774 - Alaska Electric Light and Power Company; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-04

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Alaska Electric Light and Power Company; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On January 11, 2013, Alaska Electric...

  14. 78 FR 22873 - Hamilton Street Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-17

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Hamilton Street Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On February 19, 2013, Hamilton Street Hydro, LLC,...

  15. 78 FR 22872 - Hamilton Street Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-17

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Hamilton Street Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On February 19, 2013, Hamilton Street Hydro, LLC,...

  16. 76 FR 25319 - Magnolia Water LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-04

    ... Energy Regulatory Commission Magnolia Water LLC; Notice of Preliminary Permit Application Accepted for..., Magnolia Water LLC filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to... reservoirs; (6) a powerhouse/pumping station containing 3 pump/ generating units with a total...

  17. 75 FR 65311 - Renew Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-22

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Renew Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications October 15, 2010. On July 13, 2010, Renew Hydro, LLC filed...

  18. 77 FR 59394 - Wills Creek Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-27

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Wills Creek Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On July 17, 2012, Wills Creek Hydro, LLC filed an...

  19. 76 FR 65506 - Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-21

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications; Pacific Gas and Electric Company On September 1, 2011, Pacific Gas and...

  20. 75 FR 36378 - JD Products, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-25

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission JD Products, LLC; Notice of Preliminary Permit Application Accepted for... Electricity Farm Project (project). The proposed project would utilize 11,443 Ocean Wave...

  1. 75 FR 38798 - Douglas County, OR; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-06

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Douglas County, OR; Notice of Preliminary Permit Application Accepted for...) of the Federal Power Act, proposing to study the feasibility of the Douglas County Wave and...

  2. 75 FR 11527 - Fairlawn Hydroelectric Company, LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-11

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Fairlawn Hydroelectric Company, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications March 4, 2010. On January 4, 2010, the...

  3. 76 FR 24472 - Western Minnesota Municipal Power Agency; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-02

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Western Minnesota Municipal Power Agency; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On March 8, 2011, Western...

  4. 77 FR 71190 - Henry County, Iowa; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-29

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Henry County, Iowa; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On October 3, 2012, Henry County, Iowa, filed an application...

  5. 75 FR 65312 - Vortex Hydro Energy, LLC; Notice of Competing Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-22

    ... Energy Regulatory Commission Vortex Hydro Energy, LLC; Notice of Competing Preliminary Permit Application Accepted for Filing and Soliciting Comments and Interventions October 15, 2010. On August 9, 2010, Vortex... average annual generation of 0.788 gigawatt-hours. Applicant Contact: Gus Simiao, CEO, Vortex Hydro...

  6. 75 FR 2129 - Moriah Hydro Corporation; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-14

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Moriah Hydro Corporation; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications January 6, 2010. On November 2, 2009, Moriah...

  7. 77 FR 6556 - Birch Power Company; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-08

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Birch Power Company; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On December 1, 2011, Birch Power Company filed an...

  8. 76 FR 67726 - Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-02

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On July 13, 2011, Natural Currents...

  9. 76 FR 30340 - Reliable Storage 1 LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-25

    ... waters owned by others without the owners' express permission. The proposed pumped storage project would... Energy Regulatory Commission Reliable Storage 1 LLC; Notice of Preliminary Permit Application Accepted..., Reliable Storage 1 LLC filed an application, pursuant to section 4(f) of the Federal Power Act,...

  10. 77 FR 38795 - Dolores Water Conservancy District; Notice of Competing Preliminary Permit Application Accepted...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Dolores Water Conservancy District; Notice of Competing Preliminary Permit Application Accepted for Filing and Soliciting Comments and Motions To Intervene On May 10, 2012, Dolores Water Conservancy District,...

  11. 77 FR 14775 - Stoughton Water Power Company; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-13

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Stoughton Water Power Company; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On December 7, 2011, the Stoughton Water Power...

  12. 78 FR 78355 - San Diego County Water Authority; Notice of Preliminary Permit Application Accepted For Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-26

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission San Diego County Water Authority; Notice of Preliminary Permit Application Accepted For Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On July 1, 2013, the San Diego County...

  13. 76 FR 51024 - Gay & Robinson, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-17

    ... Energy Regulatory Commission Gay & Robinson, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On July 1, 2011, Gay... would be 20.5 gigawatt-hours. Applicant Contact: Mr. Charles Okamoto, President, Gay & Robinson, Inc.,...

  14. 76 FR 9340 - Mill Town Power Project; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-17

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Mill Town Power Project; Notice of Preliminary Permit Application Accepted...-generator unit with a capacity of 110 kilowatts; (6) a new 6- foot-wide, 10-foot-long tailrace; (7) a...

  15. 77 FR 2974 - Longview Energy Exchange, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-20

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Longview Energy Exchange, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On January 3, 2012, Longview Energy Exchange,...

  16. 76 FR 71004 - Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-16

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions to Intervene, and Competing Applications On July 14, 2011, Natural Currents...

  17. 77 FR 58988 - Shearwater Design, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-25

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Shearwater Design, Inc.; Notice of Preliminary Permit Application Accepted... the Federal Power Act (FPA), proposing to study the feasibility of the Homeowner Tidal Power...

  18. 75 FR 48321 - ORPC Alaska, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-10

    ... the Cook Inlet ] Tidal Energy Project to be located in Cook Inlet in the vicinity of Anchorage, Alaska... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission ORPC Alaska, LLC; Notice of Preliminary Permit Application Accepted...

  19. 76 FR 25321 - Wild Flower Water LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-04

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Wild Flower Water LLC; Notice of Preliminary Permit Application Accepted for..., Wild Flower Water LLC filed an application, pursuant to section 4(f) of the Federal Power...

  20. 76 FR 25320 - Hawthorn Water LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-04

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Hawthorn Water LLC; Notice of Preliminary Permit Application Accepted for..., Hawthorn Water LLC filed an application, pursuant to section 4(f) of the Federal Power Act, proposing...

  1. 75 FR 75996 - Notice of Competing Preliminary Permit Applications Accepted for Filing and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-07

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Competing Preliminary Permit Applications Accepted for Filing and Soliciting Comments, and Motions To Intervene November 30, 2010. Project No. 13741-000 Lock + Hydro Friends Fund XLV Project No. 13748-000...

  2. 75 FR 75998 - Notice of Competing Preliminary Permit Applications Accepted for Filing and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-07

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Competing Preliminary Permit Applications Accepted for Filing and Soliciting Comments, and Motions To Intervene November 30, 2010. Project No. 13737-000 Lock + Hydro Friends Fund XLIV Project No. 13759-000...

  3. 77 FR 8251 - John B. Crockett; Notice of Preliminary Permit Application Accepted for Filingand Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-14

    ... Energy Regulatory Commission John B. Crockett; Notice of Preliminary Permit Application Accepted for Filingand Soliciting Comments, Motions to Intervene, and Competing Applications On January 20, 2012, John B... project) to be located on East Fork Ditch in the vicinity of Council, in Adams County, Idaho. The...

  4. Feasibility, Acceptability, and Preliminary Efficacy of a Smartphone Intervention for Schizophrenia

    PubMed Central

    Ben-Zeev, Dror; Brenner, Christopher J.; Begale, Mark; Duffecy, Jennifer; Mohr, David C.; Mueser, Kim T.

    2014-01-01

    The FOCUS smartphone intervention was developed to provide automated real-time/real-place illness management support to individuals with schizophrenia. The system was specifically designed to be usable by people with psychotic disorders who may have cognitive impairment, psychotic symptoms, negative symptoms, and/or low reading levels. FOCUS offers users both prescheduled and on-demand resources to facilitate symptom management, mood regulation, medication adherence, social functioning, and improved sleep. In this study, 33 individuals with schizophrenia or schizoaffective disorder used FOCUS over a 1-month period in their own environments. Participants were able to learn how to use the intervention independently, and all but one participant completed the trial successfully and returned the smartphones intact. Completers used the system on 86.5% of days they had the device, an average of 5.2 times a day. Approximately 62% of use of the FOCUS intervention was initiated by the participants, and 38% of use was in response to automated prompts. Baseline levels of cognitive functioning, negative symptoms, persecutory ideation, and reading level were not related to participants’ use of the intervention. Approximately 90% of participants rated the intervention as highly acceptable and usable. Paired samples t tests found significant reductions in psychotic symptoms, depression, and general psychopathology, after 1 month of FOCUS use. This study demonstrated the feasibility, acceptability, and preliminary efficacy of the FOCUS intervention for schizophrenia and introduces a new treatment model which has promise for extending the reach of evidence-based care beyond the confines of a physical clinic using widely available technologies. PMID:24609454

  5. 46 CFR 50.25-10 - Acceptance of piping components by specific letter or approved plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 2 2014-10-01 2014-10-01 false Acceptance of piping components by specific letter or approved plan. 50.25-10 Section 50.25-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING GENERAL PROVISIONS Acceptance of Material and Piping Components § 50.25-10 Acceptance of piping components by specific...

  6. 76 FR 28025 - East Maui Pumped Storage Water Supply LCC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-13

    ... Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and...; phone: (202) 502-8943. Deadline for filing comments, motions to intervene, competing applications....36. Comments, motions to intervene, notices of intent, and competing applications may be...

  7. Randomized Controlled Trial of a Web-based Indoor Tanning Intervention: Acceptability and Preliminary Outcomes

    PubMed Central

    Stapleton, Jerod L.; Manne, Sharon L.; Darabos, Katie; Greene, Kathryn; Ray, Anne E.; Turner, Amber L.; Coups, Elliot J.

    2015-01-01

    Objective This manuscript describes the acceptability and preliminary behavioral outcomes from a pilot randomized control trial of a web-based indoor tanning intervention for young adult women. The intervention targets indoor tanning user’s perceptions of then benefits and value of tanning and addresses the role of body image-related constructs in indoor tanning. Methods Participants were 186 young adult women who reported indoor tanning at least once in the past 12 months. The study design was a 2-arm randomized controlled trial with pre and post assessments and random assignment to an intervention or control condition. Intervention acceptability was assessed by obtaining participants’ evaluation of the intervention. Regression analyses were used to test for intervention condition differences in preliminary behavioral outcomes measured at 6-weeks post-intervention. Results Participants provided favorable evaluations of the intervention on several dimensions and a highly positive overall rating. Intervention participants were more likely to report abstaining from indoor tanning and indicated a lower likelihood of using indoor tanning in the future compared to control participants on the post-intervention assessment. No differences were found for sunburns. Conclusions The results of this pilot randomized controlled trial provide evidence that the indoor tanning intervention is acceptable to participants and may encourage cessation of indoor tanning behavior. The findings provide preliminary support for an indoor tanning intervention that engages tanners to challenge their beliefs about the benefits of indoor tanning. The use of a web-based indoor tanning intervention is unique and provides strong potential for dissemination. PMID:26651469

  8. 78 FR 32644 - Las Vegas Wash Hydro LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-31

    ... Energy Regulatory Commission Las Vegas Wash Hydro LLC; Notice of Preliminary Permit Application Accepted..., 2012, Las Vegas Wash Hydro LLC, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Las Vegas...

  9. 75 FR 75996 - Kahawai Power 2, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-07

    ... November 15, 2010, Kahawai Power 2, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Makaweli River Water Power... Energy Regulatory Commission Kahawai Power 2, LLC; Notice of Preliminary Permit Application Accepted...

  10. 77 FR 20382 - FFP Project 108, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-04

    ... without the owners' express permission. The proposed R. D. Bailey Water Power Project would consist of the... Energy Regulatory Commission FFP Project 108, LLC; Notice of Preliminary Permit Application Accepted for..., FFP Project 108, LLC, filed an application for a preliminary permit, pursuant to section 4(f) of...

  11. 78 FR 2989 - PayneBridge, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-15

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission PayneBridge, LLC; Notice of Preliminary Permit Application Accepted for..., PayneBridge, LLC filed an application for a successive preliminary permit under section 4(f) of...

  12. 75 FR 71429 - Clean River Power 15, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-23

    ... From the Federal Register Online via the Government Publishing Office FEDERAL ENERGY REGULATORY COMMISSION Project No. 13874-000 Clean River Power 15, LLC; Notice of Preliminary Permit Application Accepted.... On October 22, 2010, Clean River Power 15, LLC filed an application for a preliminary...

  13. 75 FR 71427 - Clean River Power 11, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-23

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Clean River Power 11, LLC; Notice of Preliminary Permit Application Accepted.... On October 15, 2010, Clean River Power 11, LLC filed an application for ] a preliminary...

  14. 75 FR 71427 - Clean River Power 12, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-23

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Clean River Power 12, LLC; Notice of Preliminary Permit Application Accepted.... On October 15, 2010, Clean River Power 12, LLC filed an application for a preliminary...

  15. 75 FR 71428 - Clean River Power 14, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-23

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Clean River Power 14, LLC; Notice of Preliminary Permit Application Accepted.... On October 15, 2010, Clean River Power 14, LLC filed an application for a preliminary...

  16. 75 FR 70226 - Clean River Power 16, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-17

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Clean River Power 16, LLC; Notice of Preliminary Permit Application Accepted.... On October 22, 2010, Clean River Power 16, LLC filed an application for a preliminary...

  17. 75 FR 76972 - Kahawai Power 1, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-10

    ... Energy Regulatory Commission Kahawai Power 1, LLC; Notice of Preliminary Permit Application Accepted for... November 12, 2010, Kahawai Power 1, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Hanalei...

  18. 77 FR 60426 - FFP Project 64 LLC: Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-03

    ... Federal Energy Regulatory Commission FFP Project 64 LLC: Notice of Preliminary Permit Application Accepted..., 2012, FFP Project 64, LLC filed an application for a preliminary permit, pursuant to section 4(f) of... Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site...

  19. 75 FR 56093 - FFP Mass 1, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-15

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Mass 1, LLC; Notice of Preliminary Permit Application Accepted for... August 9, 2010, FFP Mass 1, LLC filed an application for a preliminary permit, pursuant to section...

  20. 77 FR 60422 - FFP Project 69 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-03

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Project 69 LLC; Notice of Preliminary Permit Application Accepted for..., FFP Project 69, LLC filed an application for a preliminary permit, pursuant to section 4(f) of...

  1. 77 FR 59608 - Go Green Go Hydro LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-28

    ... Energy Regulatory Commission Go Green Go Hydro LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On June 20, 2012, Go Green Go Hydro LLC (Go Green or applicant) filed an application for a preliminary permit, pursuant...

  2. 78 FR 44111 - FFP Project 123, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-23

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Project 123, LLC; Notice of Preliminary Permit Application Accepted for... Project 123, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the...

  3. Centrifugal pumps: which suction specific speeds are acceptable

    SciTech Connect

    Hallam, J.L.

    1982-04-01

    Suction specific speed is an important consideration when purchasing or analyzing centrifugal pumps. There is a direct correlation between this parameter, pump reliability and maintenance expenses. This article demonstrates that in a large Gulf Coast oil refinery, centrifugal pumps with a suction specific speed greater than 11,000 failed at a frequency nearly twice that of centrifugal pumps with suction specific speed less than 11,000. This study consisted primarily of hydrocarbon pumps with an average horsepower of 150 hp. Results may vary some from those found if high energy water pumps are studied. 5 refs.

  4. Feasibility, acceptability, and preliminary outcomes of the Fortalezas Familiares intervention for Latino families facing maternal depression

    PubMed Central

    Valdez, Carmen R.; Padilla, Brian; Moore, Sarah; Magaña, Sandra

    2014-01-01

    This pilot study examined the feasibility, acceptability, and preliminary outcomes of a linguistically- and culturally-adapted intervention for immigrant Latina mothers with depression and their families. Fortalezas Familiares (Family Strengths) is a community-based, 12-week, multi-family group intervention that aims to increase communication about family processes leading up to and affected by the mother’s depression, build child coping and efficacy, enhance parenting competence and skills, and promote cultural and social assets within the family. In terms of feasibility, of 16 families who enrolled and participated in the intervention, 13 families attended more than 90% of meetings and completed the intervention. Post-tests reported positive changes following the intervention, including improved psychological functioning, increased family and marital support, and enhanced family functioning, as reported by mothers and other caregivers. Mothers also reported decreased conduct and hyperactivity problems among their children. Children reported positive changes in their psychological functioning and coping, peer relations, parenting warmth and acceptance, and overall family functioning. Post-intervention focus groups and surveys measuring acceptability revealed families’ satisfaction with the intervention and suggested areas of improvement. We discuss similarities and differences in outcomes between the adapted intervention, Fortalezas Familiares, and the original intervention, Keeping Families Strong, and propose future areas of intervention adaptation and development. PMID:24033238

  5. Feasibility, acceptability, and preliminary outcomes of the Fortalezas Familiares intervention for latino families facing maternal depression.

    PubMed

    Valdez, Carmen R; Padilla, Brian; Moore, Sarah McArdell; Magaña, Sandra

    2013-09-01

    This pilot study examined the feasibility, acceptability, and preliminary outcomes of a linguistically and culturally adapted intervention for immigrant Latina mothers with depression and their families. Fortalezas Familiares (Family Strengths) is a community-based, 12-week, multifamily group intervention that aims to increase communication about family processes leading up to and affected by the mother's depression, build child coping and efficacy, enhance parenting competence and skills, and promote cultural and social assets within the family. In terms of feasibility, of 16 families who enrolled and participated in the intervention, 13 families attended more than 90% of meetings and completed the intervention. Posttests reported positive changes following the intervention, including improved psychological functioning, increased family and marital support, and enhanced family functioning, as reported by mothers and other caregivers. Mothers also reported decreased conduct and hyperactivity problems among their children. Children reported positive changes in their psychological functioning and coping, parenting warmth and acceptance, and overall family functioning. Postintervention focus groups and surveys measuring acceptability revealed families' satisfaction with the intervention and suggested areas of improvement. We discuss similarities and differences in outcomes between the adapted intervention, Fortalezas Familiares, and the original intervention, Keeping Families Strong, and propose future areas of intervention adaptation and development. PMID:24033238

  6. 46 CFR 50.25-10 - Acceptance of piping components by specific letter or approved plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) MARINE ENGINEERING GENERAL PROVISIONS Acceptance of Material and Piping Components § 50.25-10 Acceptance... approved plan must do the following: (1) Submit an engineering type catalog or representative drawings of... specifications by comparing details of the materials' chemical composition, mechanical properties, method...

  7. 46 CFR 50.25-10 - Acceptance of piping components by specific letter or approved plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) MARINE ENGINEERING GENERAL PROVISIONS Acceptance of Material and Piping Components § 50.25-10 Acceptance... approved plan must do the following: (1) Submit an engineering type catalog or representative drawings of... specifications by comparing details of the materials' chemical composition, mechanical properties, method...

  8. 46 CFR 50.25-10 - Acceptance of piping components by specific letter or approved plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) MARINE ENGINEERING GENERAL PROVISIONS Acceptance of Material and Piping Components § 50.25-10 Acceptance... approved plan must do the following: (1) Submit an engineering type catalog or representative drawings of... specifications by comparing details of the materials' chemical composition, mechanical properties, method...

  9. 46 CFR 50.25-10 - Acceptance of piping components by specific letter or approved plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) MARINE ENGINEERING GENERAL PROVISIONS Acceptance of Material and Piping Components § 50.25-10 Acceptance... approved plan must do the following: (1) Submit an engineering type catalog or representative drawings of... specifications by comparing details of the materials' chemical composition, mechanical properties, method...

  10. 7 CFR 1717.605 - Design standards, plans and specifications, construction standards, and RUS accepted materials.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... will be financed by RUS. These requirements are set forth in other RUS regulations, especially in 7 CFR..., construction standards, and RUS accepted materials. 1717.605 Section 1717.605 Agriculture Regulations of the... standards, plans and specifications, construction standards, and RUS accepted materials. All...

  11. Preliminary evaluation of an analog procedure to assess acceptability of intimate partner violence against women: the Partner Violence Acceptability Movie Task

    PubMed Central

    Gracia, Enrique; Rodriguez, Christina M.; Lila, Marisol

    2015-01-01

    Acceptability of partner violence against women is a risk factor linked to its perpetration, and to public, professionals’ and victims’ responses to this behavior. Research on the acceptability of violence in intimate partner relationships is, however, limited by reliance solely on self-reports that often provide distorted or socially desirable accounts that may misrepresent respondents’ attitudes. This study presents data on the development and initial validation of a new analog task assessing respondents’ acceptability of physical violence toward women in intimate relationships: the Partner Violence Acceptability Movie Task (PVAM). This new analog task is intended to provide a more implicit measure of the acceptability of partner violence against women. For this analog task, clips were extracted from commercially available films (90-s segments) portraying partner violence. Two independent samples were used to develop and evaluate the PVAM: a sample of 245 undergraduate students and a sample of 94 male intimate partner violence offenders. This new analog task demonstrated acceptable internal consistency. Results also indicated adequate construct validity. Both perpetrators and undergraduates scoring high in the PVAM also scored higher in self-reported justifications of partner abuse. Perpetrators of partner violence scored significantly higher in acceptability of partner violence than the undergraduate sample (both male and female students), and male students scored higher than females. These preliminary results suggest that the PVAM may be a promising tool to assess the acceptability of violence in intimate partner relationships, highlighting the need to consider alternatives to self-report to evaluate potential beliefs about partner violence. PMID:26528220

  12. Acceptance and Commitment Therapy for Depression: A Preliminary Randomized Clinical Trial for Unemployed on Long-Term Sick Leave

    ERIC Educational Resources Information Center

    Folke, Fredrik; Parling, Thomas; Melin, Lennart

    2012-01-01

    This preliminary study investigated the feasibility of a brief Acceptance and Commitment Therapy (ACT) in a Swedish sample of unemployed individuals on long-term sick leave due to depression. Participants were randomized to a nonstandardized control condition (N = 16) or to the ACT condition (N = 18) consisting of 1 individual and 5 group…

  13. 76 FR 17413 - Kahawai Power 4, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-29

    ... Federal Power Act (FPA), proposing to study the feasibility of the Kekaha Waimea Water Power Project... Water Power Project would be 8.7 gigawatt-hours. Applicant Contact: Mr. Daniel R. Irvin, Free Flow Power... Energy Regulatory Commission Kahawai Power 4, LLC; Notice of Preliminary Permit Application Accepted...

  14. 77 FR 60425 - FFP Project 61 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-03

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Project 61 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On September 4, 2012, FFP Project 61, LLC filed an...

  15. 77 FR 60425 - FFP Project 60 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-03

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Project 60 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On September 4, 2012, FFP Project 60, LLC filed an...

  16. 77 FR 23477 - City of New York; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-19

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission City of New York; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On March 1, 2012, the City of New York filed an...

  17. 75 FR 78985 - County of DuPage; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-17

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission County of DuPage; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications December 10, 2010. On September 21, 2010, the County of...

  18. 77 FR 31843 - Swan Lake North Hydro, LLC; Notice of Preliminary Permit Application Accepted For Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-30

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Swan Lake North Hydro, LLC; Notice of Preliminary Permit Application Accepted For Filing and Soliciting Comments, Motions to Intervene, and Competing Applications On April 3, 2012, Swan Lake North Hydro, LLC, filed...

  19. 76 FR 18756 - Kahawai Power 5, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-05

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Kahawai Power 5, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On March 1, 2011, Kahawai Power 5, LLC filed an application...

  20. 75 FR 40799 - McGinnis, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-14

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission McGinnis, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications July 6, 2010. On September 29, 2009, McGinnis, Inc. filed...

  1. 75 FR 40805 - McGinnis, Inc. Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-14

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission McGinnis, Inc. Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications July 6, 2010. On September 29, 2009, McGinnis, Inc. filed...

  2. 75 FR 40804 - McGinnis, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-14

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission McGinnis, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications July 6, 2010. On September 29, 2009, McGinnis, Inc. filed...

  3. 78 FR 69081 - Mid-Atlantic Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-18

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Mid-Atlantic Hydro, LLC; Notice of Preliminary Permit Application Accepted... powerhouse, containing one 7.9-megawatt (MW) turbine generator unit; (3) a new 2.8-mile-long, 25-kilovolt...

  4. 76 FR 50726 - Riverbank Hydro No. 14, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-16

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Riverbank Hydro No. 14, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On May 2, 2011, Riverbank Hydro No. 14, LLC...

  5. 75 FR 66082 - ORPC Alaska 2, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-27

    ... study the feasibility of the East Foreland Tidal Energy Project (East Foreland project) to be located in... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission ORPC Alaska 2, LLC; Notice of Preliminary Permit Application Accepted...

  6. 77 FR 50682 - KC Scoby Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-22

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission KC Scoby Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On June 11, 2012, KC Scoby Hydro, LLC, filed an application...

  7. 78 FR 35021 - FFP Project 119, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-11

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Project 119, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On February 1, 2013, FFP Project 119, LLC filed an...

  8. 76 FR 71960 - KC Hydro LLC of New Hampshire; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-21

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission KC Hydro LLC of New Hampshire; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On August 8, 2011, KC Hydro LLC of New Hampshire...

  9. The Preventing Relational Aggression in Schools Everyday Program: A Preliminary Evaluation of Acceptability and Impact

    PubMed Central

    Leff, Stephen S.; Waasdorp, Tracy Evian; Paskewich, Brooke; Gullan, Rebecca Lakin; Jawad, Abbas F.; MacEvoy, Julie Paquette; Feinberg, Betsy E.; Power, Thomas J.

    2011-01-01

    Despite recent research suggesting that relationally aggressive behaviors occur frequently and may lead to physically aggressive actions within urban school settings, there has been little prior research to develop and evaluate relational aggression prevention efforts within the urban schools. The current article describes the development and preliminary evaluation of the Preventing Relational Aggression in Schools Everyday (PRAISE) Program. PRAISE is a 20-session classroom-based universal prevention program, designed to be appropriate and responsive to the needs of youth within the urban school context. Results suggest strong acceptability for the program and feasibility of implementation. Further, the program was especially beneficial for girls. For instance, girls in classrooms randomly assigned to the PRAISE Program demonstrated higher levels of knowledge for social information processing and anger management techniques and lower levels of relational aggression following treatment as compared to similar girls randomly assigned to a no-treatment control condition. Further, relationally aggressive girls exhibited similar benefits from the program (greater knowledge and lower levels of relational aggression) plus lower levels of overt aggression following treatment as compared to relationally aggressive girls within the control classrooms. In contrast, the program was not associated with improvements for boys across most measures. The significance and implications of the findings for research and practice are discussed. PMID:21686034

  10. Preliminary criticality study supporting transuranic waste acceptance into the plasma hearth process

    SciTech Connect

    Slate, L.J.; Santee, G.E. Jr.

    1996-12-31

    This study documents preliminary scoping calculations to address criticality issues associated with the processing of transuranic (TRU) waste and TRU mixed waste in the Plasma Hearth Process (PHP) Test Project. To assess the criticality potential associated with processing TRU waste, the process flow in the PHP is evaluated to identify the stages where criticality could occur. A criticality analysis methodology is then formulated to analyze the criticality potential. Based on these analyses, TRU acceptance criteria can be defined for the PHP. For the current level of analysis, the methodology only assesses the physical system as designed and does not address issues associated with the criticality double contingency principle. The analyses suggest that criticality within the PHP system and within the planned treatment residue (stag) containers does not pose a criticality hazard even when processing waste feed drums containing a quantity of TRU greater than would be reasonably expected. The analyses also indicate that the quantity of TRU that can be processed during each batch is controlled by moving and storage conditions for the resulting slag collection drums.

  11. 10 CFR 32.110 - Acceptance sampling procedures under certain specific licenses.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Acceptance sampling procedures under certain specific licenses. 32.110 Section 32.110 Energy NUCLEAR REGULATORY COMMISSION SPECIFIC DOMESTIC LICENSES TO MANUFACTURE OR TRANSFER CERTAIN ITEMS CONTAINING BYPRODUCT MATERIAL Quality Control Sampling Procedures §...

  12. 77 FR 30523 - Albany Engineering Corporation; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-23

    ... Energy Regulatory Commission Albany Engineering Corporation; Notice of Preliminary Permit Application..., 2012, Albany Engineering Corporation filed an application for a preliminary permit, pursuant to section...) or 16,000 MWh (Scenario 2). Applicant Contact: Wendy Jo Carey, Albany Engineering Corporation,...

  13. 77 FR 20382 - Whitestone Power and Communications; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-04

    ... line; and (7) appurtenant facilities. The project is anticipated to operate from April until October... Energy Regulatory Commission Whitestone Power and Communications; Notice of Preliminary Permit... March 5, 2012, Whitestone Power and Communications filed an application for a preliminary...

  14. 75 FR 74697 - Central Oregon Irrigation District; Notice of Competing Preliminary Permit Application Accepted...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-01

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Central Oregon Irrigation District; Notice of Competing Preliminary Permit..., 2010, Central Oregon Irrigation District filed an application for a preliminary permit, pursuant...

  15. 77 FR 28872 - Willwood Irrigation District; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-16

    ... Energy Regulatory Commission Willwood Irrigation District; Notice of Preliminary Permit Application..., 2012, the Willwood Irrigation District filed an application for a preliminary permit, pursuant to... Hydropower Project (Deer Creek Project or project) to be ] located on the Willwood Irrigation District's...

  16. 77 FR 27768 - Greybull Valley Irrigation District; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-11

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Greybull Valley Irrigation District; Notice of Preliminary Permit... February 1, 2012, the Greybull Valley Irrigation District filed an application for a preliminary...

  17. 77 FR 27769 - Greybull Valley Irrigation District; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-11

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Greybull Valley Irrigation District; Notice of Preliminary Permit... February 1, 2012, the Greybull Valley Irrigation District filed an application for a preliminary...

  18. 77 FR 27768 - Greybull Valley Irrigation District; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-11

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Greybull Valley Irrigation District; Notice of Preliminary Permit... February 1, 2012, Greybull Valley Irrigation District filed an application for a preliminary...

  19. 78 FR 16496 - Consolidated Irrigation Company; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-15

    ... Energy Regulatory Commission Consolidated Irrigation Company; Notice of Preliminary Permit Application..., 2011, the Consolidated Irrigation Company of Preston, Idaho, filed an application for a preliminary... the Consolidated Irrigation Glendale Conduit Hydro Project (Glendale Conduit Project or project) to...

  20. 76 FR 12957 - City of Tacoma, Washington; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-09

    ... Energy Regulatory Commission City of Tacoma, Washington; Notice of Preliminary Permit Application... Tacoma, Washington (Tacoma), filed an application for a preliminary permit, pursuant to section 4(f) of..., in Pierce County, Washington.\\1\\ The sole ] purpose of a preliminary permit, if issued, is to...

  1. 76 FR 67181 - Windsor Machinery Co., Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... Energy Regulatory Commission Windsor Machinery Co., Inc.; Notice of Preliminary Permit Application..., 2011, Windsor Machinery Co., Inc. filed an application for a preliminary permit, pursuant to section 4... an annual generation of 1,600 megawatt-hours. Applicant Contact: Sarah L. Bower, Windsor Machinery...

  2. 77 FR 20019 - Nuvista Light and Electric Cooperative, Inc.; Notice of Preliminary Permit Application Accepted...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-03

    ... Energy Regulatory Commission Nuvista Light and Electric Cooperative, Inc.; Notice of Preliminary Permit... March 2, 2012, Nuvista Light and Electric Cooperative, Inc., filed an application for a preliminary... Contact: Ms. Elaine Brown, Executive Director, Nuvista Light and Electric Cooperative, Inc., 301...

  3. 76 FR 35213 - AJT Mining Properties, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-16

    ... Energy Regulatory Commission AJT Mining Properties, Inc.; Notice of Preliminary Permit Application..., 2011, AJT Mining Properties, Inc., filed an application for a preliminary permit, pursuant to section 4...: Mr. Scott Willis, AJT Mining Properties, Inc., 5601 Tonsgard Court, Juneau, Alaska 99801; phone:...

  4. 76 FR 12728 - Pacific Gas and Electric Company; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-08

    ... Energy Regulatory Commission Pacific Gas and Electric Company; Notice of Preliminary Permit Application..., 2011, Pacific Gas and Electric Company (PG&E) filed an application for a successive preliminary permit... new single-unit powerhouse with a turbine and generator constructed downstream of the right...

  5. 76 FR 70440 - Table Mountain Pumped Storage Project; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-14

    ... Mountain Hydro, LLC., 1210 W. Franklin St., Ste. 2, Boise, ID 83702; phone (208) 246-9925. FERC Contact... Energy Regulatory Commission Table Mountain Pumped Storage Project; Notice of Preliminary Permit... September 14, 2011, Table Mountain Hydro, LLC, Arizona, filed an application for a preliminary...

  6. 77 FR 25163 - Stoughton Water Power Company; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-27

    ... Energy Regulatory Commission Stoughton Water Power Company; Notice of Preliminary Permit Application..., 2011, the Stoughton Water Power Company filed an application for a preliminary permit under section 4(f) of the Federal Power Act proposing to study the feasibility of the proposed Stoughton Dam Water...

  7. 77 FR 58125 - American River Power, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-19

    ..., 2012, American River Power, LLC filed an application for a preliminary permit under section 4(f) of the Federal Power Act proposing to study the feasibility of the Brookville Hydroelectric Water Power Project... Federal Energy Regulatory Commission American River Power, LLC; Notice of Preliminary Permit...

  8. 78 FR 12050 - S. Martinez Livestock, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-21

    ... Energy Regulatory Commission S. Martinez Livestock, Inc.; Notice of Preliminary Permit Application..., 2012, and revised on July 30, 2012, S. Martinez Livestock, Inc. filed an application for a preliminary.... Martinez, S. Martinez Livestock, Inc., 13395 Hwy. 24, Moxee, WA 98936; phone: (541) 298-3300. ]...

  9. 76 FR 75542 - Porcupine Dam Hydropower Project; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-02

    ... Energy Regulatory Commission Porcupine Dam Hydropower Project; Notice of Preliminary Permit Application... 20, 2011, Porcupine Reservoir Company, Utah, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the...

  10. 77 FR 75630 - New England Hydropower Company, LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-21

    ... Federal Energy Regulatory Commission New England Hydropower Company, LLC; Notice of Preliminary Permit... December 7, 2012, the New England Hydropower Company, LLC, filed an application for a preliminary permit... privately owned. Applicant Contact: Mr. Michael C. Kerr, New England Hydropower Company, LLC, P.O. Box...

  11. 78 FR 61958 - New England Hydropower Company, LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-08

    ... Energy Regulatory Commission New England Hydropower Company, LLC; Notice of Preliminary Permit... August 20, 2013, the New England Hydropower Company, LLC filed an application for a preliminary permit.... Michael C. Kerr, New England Hydropower Company, LLC, P.O. Box 5524, Beverly Farms, Massachusetts...

  12. 78 FR 28838 - New England Hydropower Company, LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... Energy Regulatory Commission New England Hydropower Company, LLC; Notice of Preliminary Permit... April 29, 2013, the New England Hydropower Company, LLC filed an application for a preliminary permit...: Mr. Michael C. Kerr, New England Hydropower Company, LLC, P.O. Box 5524, Beverly Farms,...

  13. 78 FR 2988 - New England Hydropower Company, LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-15

    ... Energy Regulatory Commission New England Hydropower Company, LLC; Notice of Preliminary Permit... December 28, 2012, the New England Hydropower Company, LLC, filed an application for a preliminary permit... Protection. Applicant Contact: Mr. Michael C. Kerr, New England Hydropower Company, LLC, P.O. Box...

  14. 77 FR 71590 - New England Hydropower Company, LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-03

    ... Federal Energy Regulatory Commission New England Hydropower Company, LLC; Notice of Preliminary Permit... November 9, 2012, the New England Hydropower Company, LLC, filed an application for a preliminary permit.... Michael C. Kerr, New England Hydropower Company, LLC, P.O. Box 5524, Beverly Farms, Massachusetts...

  15. 76 FR 76155 - Nevada Hydro Company, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-06

    ... Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site http://www.ferc..., 2011, the Nevada Hydro Company (Nevada Hydro) filed an application for a preliminary permit, pursuant... County, California. The sole purpose of a preliminary permit, if issued, is to grant the permit...

  16. 78 FR 55072 - Sutton Hydroelectric Company, LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-09

    ... Energy Regulatory Commission Sutton Hydroelectric Company, LLC; Notice of Preliminary Permit Application..., 2013, Sutton Hydroelectric Company, LLC filed an application for a successive preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the...

  17. 75 FR 66079 - Bishop Tungsten Development, LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-27

    ... Energy Regulatory Commission Bishop Tungsten Development, LLC; Notice of Preliminary Permit Application..., 2010. On November 9, 2009, Bishop Tungsten Development, LLC filed an application for a preliminary... be 26,300,000 kilowatt-hours. Applicant Contact: Douglas A. Hicks, Bishop Tungsten Development,...

  18. 78 FR 28838 - Hamilton Street Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... Energy Regulatory Commission Hamilton Street Hydro, LLC; Notice of Preliminary Permit Application..., 2013, Hamilton Street Hydro, LLC, filed an application for a preliminary permit, pursuant to section 4... Boumansour, Hamilton Street Hydro, LLC, 1401 Walnut Street, Suite 301, Boulder, CO 80302; phone: (303)...

  19. 77 FR 13593 - AMENICO Green Solutions, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-07

    ... Federal Energy Regulatory Commission AMENICO Green Solutions, LLC; Notice of Preliminary Permit... Green Solutions, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the..., Manager, AMENICO Green Solutions, LLC, 5 Main Street, Pittsfield, NH 03263; phone: (603) 228- 3611....

  20. 77 FR 38622 - Whitewater Green Energy, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-28

    ... Energy Regulatory Commission Whitewater Green Energy, LLC; Notice of Preliminary Permit Application..., 2012, Whitewater Green Energy, LLC, filed an application for a preliminary permit, pursuant to section... gigawatt-hours. Applicant Contact: Mr. David Harmon, Whitewater Green Energy, LLC, 601 7th Avenue, P.O....

  1. 78 FR 5798 - Ceresco Hydroelectric Dam, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-28

    ... Energy Regulatory Commission Ceresco Hydroelectric Dam, LLC; Notice of Preliminary Permit Application..., 2012, Ceresco Hydroelectric Dam, LLC, filed an application for a preliminary permit, pursuant to... the proposed normal pool elevation of 876.8 feet National Geodetic Vertical Datum; (2) a dam...

  2. 76 FR 23321 - New Sweden Irrigation District, ID; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-26

    ... Energy Regulatory Commission New Sweden Irrigation District, ID; Notice of Preliminary Permit Application..., 2011, New Sweden Irrigation District filed an application for a preliminary permit, pursuant to section.... The estimated annual generation of the New Sweden Irrigation Project would be 5.6...

  3. 75 FR 2128 - North Unit Irrigation District; Notice of Competing Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-14

    ... Energy Regulatory Commission North Unit Irrigation District; Notice of Competing Preliminary Permit... Irrigation District filed an application for a preliminary permit, pursuant to section 4(f) of the Federal.... Applicant Contact: Mike Britton, North Unit Irrigation District, 2024 NW. Beech Street, Madras, OR...

  4. 76 FR 73619 - Francis Walter Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-29

    ..., 2011, Francis Walter Hydro, LLC, filed an application for a preliminary permit, pursuant to section 4(f... outlet; (2) a concrete powerhouse 50 feet long by 75 feet wide; (3) two 4.5-megawatt (MW) ]...

  5. 75 FR 65625 - Osprey II, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-26

    ..., 2010, Osprey II, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the...-diameter, 1,900-foot-long buried concrete penstock; (3) a new approximately 400-square-foot...

  6. 75 FR 74702 - City of Whittier; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-01

    ... preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the... consist of the following: (1) An approximately 100-foot-long, 20-foot-high reinforced concrete dam; (2)...

  7. 78 FR 56692 - Albany Engineering Corporation; Notice of Successive Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-13

    ... Energy Regulatory Commission Albany Engineering Corporation; Notice of Successive Preliminary Permit... August 20, 2013, Albany Engineering Corporation (Albany Engineering) filed an application for a..., Albany Engineering Corporation, 5 Washington Square, Albany, NY 12205; phone: (518) 456-7712....

  8. Proposed GTA welding specification and acceptance criteria for the MC4163

    SciTech Connect

    Kwiatkowski, J.J.

    1991-04-12

    This specification documents the gas tungsten arc (GTA) welding process and production weld acceptance criteria requirements for the MC4163. This document is written specifically to apply to the welds on the MC4163 and is not to be used as a general gas tungsten arc welding specification. All sections of this specification must be complied with unless specifically exempted in writing. There are a total of five welds with three different joint designs required to fabricate the MC4163. In the order of fabrication they are (1) initiator closure disc, (2) nozzle to case girth welds, two and, (3) nozzle closure disc welds, two. This specification will only address the nozzle to case girth welds and the nozzle closure disc welds.

  9. Development of the Standardized DOE Spent Nuclear Fuel Canister Design and Preliminary Design Specification

    SciTech Connect

    A. G. Ware; D. K. Morton; N. L. Smith; S. D. Snow; T. E. Rahl

    1999-08-01

    The Department of Energy (DOE) has developed a set of standard canisters for the handling, interim storage, transportation, and disposal in the national repository of DOE spent nuclear fuel (SNF). The Department's National Spent Nuclear Fuel Program (NSNFP) and the Office of Civilian Radioactive Waste Management (OCRWM) worked together along with DOE sites to develop the canister design. The standardized DOE SNF in a variety of potential storage and transportation systems and also be acceptable to the repository, based on current and anticipated future requirements. Since specific design details regarding storage, transportation, and repository dispoal of DOE SNF are not yet finalized, the NSNFP recognized that it was necessary to specify a complete DOE SNF canister design. This design had to be flexible enough to be incorporated into various storage and transportation systems and yet standardized so that the canister would be acceptable to the repository for disposal. This paper discusses the efforts taken to gain DOE complex consensus, the reasons for various design decisions, the steps taken to demonstrate the robustness of the proposed canister design, and other insights associated with the development of the standardized DOE SNF canister design and the preliminary design specification.

  10. Spent fuel acceptance scenarios devoted to shutdown reactors: A preliminary analysis

    SciTech Connect

    Wood, T.W.; Plummer, A.M.; Dippold, D.G.; Short, S.M.; Battelle Memorial Inst., Columbus, OH . Office of Transportation Systems and Planning; Pacific Northwest Lab., Richland, WA )

    1989-10-01

    Spent fuel acceptance schedules and the allocation of federal acceptance capacity among commercial nuclear power reactors have important operational and cost consequences for reactor operators. Alternative allocation schemes were investigated to some extent in DOE's MRS Systems Study. The current study supplements these analyses for a class of acceptance schemes in which the acceptance capacity of the federal radioactive waste management system is allocated principally to shutdown commercial power reactors, and extends the scope of analysis to include considerations of at-reactor cask loading rates. The operational consequences of these schemes for power reactors, as measured in terms of quantity of spent fuel storage requirement above storage pool capacities and number of years of pool operations after last discharge, are estimated, as are the associated utility costs. This study does not attempt to examine the inter-utility equity considerations involved in departures from the current oldest-fuel-first (OFF) allocation rule as specified in the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste.'' In the sense that the alternative allocations are more economically efficient than OFF, however, they approximate the allocations that could result from free exchange of acceptance rights among utilities. Such a process would result in the preservation of inter-utility equity. 13 refs., 9 figs., 9 tabs.

  11. 76 FR 25322 - Oklahoma Rose Water LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-04

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Oklahoma Rose Water LLC; Notice of Preliminary Permit Application... 30, 2010, Oklahoma Rose Water LLC filed an application, pursuant to section 4(f) of the Federal...

  12. 77 FR 790 - Grant Lake Hydroelectric Project; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-06

    ..., 2011, Kenai Hydro, LLC, Alaska, filed an application for a successive preliminary permit, pursuant to..., connecting the powerhouse to the City of Seward's or to Chugach Electric's transmission line. The total energy output would be 19,700 megawatthours. Applicant Contact: Mr. Mike Salzetti, Kenai Hydro, LLC,...

  13. 77 FR 37667 - Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-22

    ... Power Act, proposing to study the feasibility of the Trinidad Lake Hydroelectric Project (Trinidad Lake Project or project) at the U.S. Army Corps of Engineers' (Corps) Lake Trinidad dam on the Purgatoire River, near the City of Trinidad in Las Animas County, Colorado. The sole purpose of a preliminary permit,...

  14. 75 FR 60441 - Northern Wasco People's Utility District; Notice of Preliminary Permit Application Accepted For...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-30

    ... Federal Energy Regulatory Commission Northern Wasco People's Utility District; Notice of Preliminary... Applications September 22, 2010. On August 23, 2010, Northern Wasco People's Utility District (Northern Wasco...; (3) a new 600- foot-long, 6-foot-diameter penstock to be constructed at the site of the old...

  15. 76 FR 9770 - Utah Board of Water Resources Notice of Successive Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-22

    ... water intake would convey water from the Bureau of Reclamation's Lake Powell up to a high point within... Energy Regulatory Commission Utah Board of Water Resources Notice of Successive Preliminary Permit... February 1, 2011, the Utah Board of Water Resources filed an application for a successive...

  16. 76 FR 45251 - Reliable Storage 1 LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-28

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Reliable Storage 1 LLC; Notice of Preliminary Permit Application..., 2011, Reliable Storage 1 LLC, filed an application, pursuant to section 4(f) of the Federal Power...

  17. 75 FR 59706 - Coastal Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-28

    ... Federal Energy Regulatory Commission Coastal Hydropower, LLC; Notice of Preliminary Permit Application..., 2010. On February 9, 2010, and supplemented on July 16, 2010, Coastal Hydropower, LLC filed an..., Coastal Hydropower, LLC, Key Centre, 601 108th Avenue, NE., Suite 1900, Bellevue, WA 98004; phone:...

  18. 75 FR 8321 - Coastal Hydropower LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-24

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Project No. 13619-000 Coastal Hydropower LLC; Notice of Preliminary Permit... February 18, 2010. On November 5, 2009, Coastal Hydropower LLC filed an application for a...

  19. 76 FR 57731 - Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-16

    ... Comments, Motions To Intervene, and Competing Applications; McKay Dam Hydropower, LLC On May 31, 2011, McKay Dam Hydropower, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the...: Carl Spetzler, McKay Dam Hydropower, LLC, 745 Emerson Street, Palo Alto, CA 94301, phone (650)...

  20. 76 FR 57731 - Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-16

    ... Comments, Motions To Intervene, and Competing Applications; Kachess Dam Hydropower, LLC On May 31, 2011, Kachess Dam Hydropower, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the... Contact: Carl Spetzler, Kachess Dam Hydropower, LLC, 745 Emerson Street, Palto Alto, CA 94301, phone...

  1. 77 FR 4290 - Conway Ranch Hydropower Project; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-27

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Conway Ranch Hydropower Project; Notice of Preliminary Permit Application... the Federal Power Act (FPA), proposing to study the feasibility of the Conway Ranch Hydropower...

  2. 77 FR 107 - Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-03

    ... Comments, Motions To Intervene, and Competing Applications; Earth By Design, Inc. On October 13, 2011, and supplemented on October 30, 2011, Earth By Design, Inc. filed an application for a preliminary permit, pursuant... structure; (2) a ] 1210-foot-long, 72-inch-diameter penstock consisting of a 365-foot- long,...

  3. 76 FR 19355 - Oregon Winds Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-07

    ... Federal Energy Regulatory Commission Oregon Winds Hydro, LLC; Notice of Preliminary Permit Application...) of the Federal Power Act (FPA), proposing to study the feasibility of the Oregon Winds Pumped Storage... Winds Pumped Storage Project would be 1,533 gigawatt-hours. Applicant Contact: Mr. Matthew Shapiro,...

  4. 77 FR 76026 - Tlingit-Haida Regional Electric Authority; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-26

    ... Energy Regulatory Commission Tlingit-Haida Regional Electric Authority; Notice of Preliminary Permit...-Haida Regional Electric Authority (THREA) filed an application, pursuant to section 4(f) of the Federal... number (P-14424) in the docket number field to access the document. For assistance, call toll-free 1-...

  5. 78 FR 71601 - KC Small Hydro LLC; Advanced Hydropower, Inc.; Notice of Preliminary Permit Application Accepted...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-29

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission KC Small Hydro LLC; Advanced Hydropower, Inc.; Notice of Preliminary Permit... the applicant to KC Small Hydro LLC. (KCS Hydro). On November 5, 2013, Advanced Hydropower,...

  6. 77 FR 21765 - Nevada Hydro Company, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-11

    ....2001(a)(1)(iii) and the instructions on the Commission's Web site http://www.ferc.gov/docs-filing..., including a copy of the application, can be viewed or printed on the ``eLibrary'' link of Commission's Web..., 2011, the Nevada Hydro Company (Nevada Hydro) filed an application for a preliminary permit,...

  7. 76 FR 48846 - Free Flow Power Corporation; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-09

    ... Energy Regulatory Commission Free Flow Power Corporation; Notice of Preliminary Permit Application..., 2011, Free Flow Power Corporation filed an application, pursuant to section 4(f) of the Federal Power...: Ramya Swaminathan, Free Flow Power Corporation, 239 Causeway Street, Boston, MA 02114; phone (978)...

  8. 76 FR 48845 - Free Flow Power Corporation; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-09

    ... Energy Regulatory Commission Free Flow Power Corporation; Notice of Preliminary Permit Application..., 2011, Free Flow Power Corporation filed an application, pursuant to section 4(f) of the Federal Power...: Ramya Swaminathan, Free Flow Power Corporation, 239 Causeway Street, Boston, MA 02114; phone (978)...

  9. 76 FR 39869 - Free Flow Power Corporation; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-07

    ... Energy Regulatory Commission Free Flow Power Corporation; Notice of Preliminary Permit Application..., 2011, Free Flow Power Corporation filed an application, pursuant to section 4(f) of the Federal Power...: Ramya Swaminathan, Free Flow Power Corporation, 239 Causeway Street, Boston, MA 02114; phone (978)...

  10. 75 FR 66082 - Bishop Tungsten Development, LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-27

    ... Federal Energy Regulatory Commission Bishop Tungsten Development, LLC; Notice of Preliminary Permit... October 20, 2010. On November 9, 2009, Bishop Tungsten Development, LLC filed an application for a... Tungsten Development, LLC, 725 9050 Pine Creek Road, Bishop, CA 93514; phone: (706) 387-2080. FERC...

  11. 75 FR 11153 - Main Mill Street Investments, LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-10

    ... Energy Regulatory Commission Main Mill Street Investments, LLC; Notice of Preliminary Permit Application.... On November 16, Main Mill Street Investments, LLC (Main Mill Street Investments) filed an application... an estimated average annual generation of 10,000 megawatt-hours. Main Mill Street Investments:...

  12. 75 FR 61479 - Kendall Head Tidal Energy Project; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-05

    ... Energy Regulatory Commission Kendall Head Tidal Energy Project; Notice of Preliminary Permit Application..., pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Kendall Head... estimated annual generation of the Kendall Head Tidal Energy Project would be 3.12 to 3.96...

  13. 75 FR 78231 - Notice of Competing Preliminary Permit Applications Accepted for Filing and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-15

    ... study the feasibility of hydropower at the U.S. Army Corps of Engineers Montgomery Locks and Dam on the Ohio River near the town of Industry, in Beaver County, Pennsylvania. The sole purpose of a preliminary.... Descriptions of the proposed Montgomery Locks and Dam Projects: Lock+\\TM\\ Hydro Friends Fund XXXVI's...

  14. 78 FR 32385 - Lewis County Development Corporation; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-30

    ... the feasibility of the Croghan Dam Hydroelectric Project (project) to be located at the existing Croghan Dam, on the Beaver River, in Lewis County, New York. The sole purpose of a preliminary permit, if... would consist of: (1) An existing concrete gravity dam structure consisting of an 11.5-foot-high by...

  15. 76 FR 80926 - Cortez Pumped Storage Project; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-27

    ... Federal Energy Regulatory Commission Cortez Pumped Storage Project; Notice of Preliminary Permit... Pumped Storage Project to be located on Plateau Creek, near the town of Dolores, Montezuma County... a total storage capacity of 8,000 acre-feet and a water surface area of 275 acres at full...

  16. 77 FR 38050 - Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-26

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit....4-megawatt Francis turbine/generator unit; (3) a tailrace discharging flows into the existing...

  17. 76 FR 8728 - Bear Creek Hydro Associates, LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-15

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Bear Creek Hydro Associates, LLC; Notice of Preliminary Permit Application... new, 250-kilowatt (kW) generator would be installed. The estimated annual power generation for...

  18. 76 FR 70720 - Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-15

    ... the Federal Power Act, proposing to study the feasibility of the Avalon Tidal Energy Project, which... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Natural Currents Energy Services, LLC; Notice of Preliminary...

  19. 77 FR 50101 - Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-20

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Natural Currents Energy Services, LLC; Notice of Preliminary Permit... May 22, 2012, Natural Currents Energy Services, LLC filed an application, pursuant to section 4(f)...

  20. 77 FR 61598 - Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-10

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Natural Currents Energy Services, LLC; Notice of Preliminary Permit... May 22, 2012, Natural Currents Energy Services, LLC filed an application, pursuant to section 4(f)...

  1. 77 FR 39693 - Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-05

    ... the Federal Power Act, proposing to study the feasibility of the Fisher's Island Tidal Energy Project... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Natural Currents Energy Services, LLC; Notice of Preliminary...

  2. 77 FR 60429 - Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-03

    ... the Federal Power Act, proposing to study the feasibility of the Fisher's Island Tidal Energy Project... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Natural Currents Energy Services, LLC; Notice of Preliminary...

  3. 77 FR 17474 - Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-26

    ... the Federal Power Act, proposing to study the feasibility of the Orient Point Tidal Energy Project... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Natural Currents Energy Services, LLC; Notice of Preliminary...

  4. 76 FR 37806 - Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-28

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Natural Currents Energy Services, LLC; Notice of Preliminary Permit... March 29, 2011, and supplemented on May 31, 2011, Natural Currents Energy Services, LLC filed...

  5. 76 FR 67726 - Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-02

    ... the Federal Power Act, proposing to study the feasibility of the Dorchester--Maurice Tidal Energy... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Natural Currents Energy Services, LLC; Notice of Preliminary...

  6. 76 FR 76154 - Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-06

    ... the Federal Power Act, proposing to study the feasibility of the Cape May Tidal Energy Project, which... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Natural Currents Energy Services, LLC; Notice of Preliminary...

  7. 75 FR 70730 - Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-18

    ... the Salem Tidal Energy Project, which would be located on the Salem River, in Salem County, New Jersey... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Natural Currents Energy Services, LLC; Notice of Preliminary...

  8. 76 FR 76155 - Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-06

    ... the Federal Power Act, proposing to study the feasibility of the Maurice River Tidal Energy Project... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Natural Currents Energy Services, LLC; Notice of Preliminary...

  9. 77 FR 19279 - Long Canyon Pumped Storage Project; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-30

    ... Energy Regulatory Commission Long Canyon Pumped Storage Project; Notice of Preliminary Permit Application... section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Long Canyon Pumped Storage Project to be located near the town of Moab, Grand County, Utah. The ] project would...

  10. 78 FR 44557 - Turnagain Arm Tidal Energy Corporation; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-24

    ...-electrical energy generating units for a total installed capacity of 240 MW; (2) one control building... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Turnagain Arm Tidal Energy Corporation; Notice of Preliminary...

  11. 75 FR 62121 - Osprey IV, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-07

    ... the Federal Power Act (FPA), proposing to study the feasibility of the 1 Pond Dam Project to be located at the 1 Pond Dam, on the Mousam River, in York County, Maine. The sole purpose of a preliminary.... The proposed project would consist of: (1) The existing 14-foot- high, 245-foot-long 1 Pond Dam;...

  12. 77 FR 67360 - Igiugig Village Council; Notice of Successive Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-09

    ... Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On October 1... to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Igiugig RISEC... the following: (1) Up to 8 proposed RISEC kinetic energy-to-electrical energy conversion...

  13. Improving International-Level Chess Players' Performance with an Acceptance-Based Protocol: Preliminary Findings

    ERIC Educational Resources Information Center

    Ruiz, Francisco J.; Luciano, Carmen

    2012-01-01

    This study compared an individual, 4-hr intervention based on acceptance and commitment therapy (ACT) versus a no-contact control condition in improving the performance of international-level chess players. Five participants received the brief ACT protocol, with each matched to another chess player with similar characteristics in the control…

  14. Preliminary waste acceptance criteria for the ICPP spent fuel and waste management technology development program

    SciTech Connect

    Taylor, L.L.; Shikashio, R.

    1993-09-01

    The purpose of this document is to identify requirements to be met by the Producer/Shipper of Spent Nuclear Fuel/High-LeveL Waste SNF/HLW in order for DOE to be able to accept the packaged materials. This includes defining both standard and nonstandard waste forms.

  15. Teachers Acceptance of Mobile Learning for Teaching and Learning in Islamic Education: A Preliminary Study

    ERIC Educational Resources Information Center

    Nawi, Aliff; Hamzah, Mohd Isa; Rahim, Arif Abdul

    2015-01-01

    This study was conducted to investigate the perceptions of the religious teachers' readiness to use mobile phones as m-learning. The focus of the study is to examine some aspects namely; (1) types of handset used; (2) the use of mobile applications, (3) mobile learning activities, and; (4) the acceptance of mobile phones in teaching and learning.…

  16. 75 FR 5076 - American Hydro Power, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-01

    ... Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications January 22.... Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or..., motions to intervene, notices of intent, and competing applications may be filed electronically via...

  17. 75 FR 57767 - Alaska Power and Telephone Company; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-22

    ... Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications September 16.... Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or... applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to...

  18. The Feasibility, Acceptability, and Preliminary Effectiveness of a Promotora-Led Diabetes Prevention Program (PL-DPP) in Latinas

    PubMed Central

    O’Brien, Matthew J.; Perez, Alberly; Alos, Victor A.; Whitaker, Robert C.; Ciolino, Jody D.; Mohr, David C.; Ackermann, Ronald T.

    2015-01-01

    Purpose The purpose of this pilot study is to test the feasibility, acceptability, and preliminary effectiveness of a Promotora-Led Diabetes Prevention Program (PL-DPP) in Hispanic women (Latinas). Methods Twenty Latina adults with prediabetes were enrolled in this single-arm pilot trial of PL-DPP. Participants underwent a year-long lifestyle intervention consisting of 24 sessions divided into 14 weekly core sessions and 10 post-core sessions offered either biweekly or monthly. Each session was led by a promotora in Spanish. The primary outcome was weight change over the 12-month study period. Results The study participants were socioeconomically challenged, middle-aged Latinas with limited access to health care. Eighteen participants (90%) completed at least 12 sessions, and 1 was lost to follow-up. Overall, participants reported high levels of satisfaction with PL-DPP. At 12 months, the participants achieved a mean weight loss of 10.8 pounds, which corresponded to 5.6% of initial body weight. Significant pre-post reductions in waist circumference, diastolic blood pressure, LDL cholesterol, and insulin levels were also observed. Modest reductions in A1C and fasting plasma glucose were not significant. Conclusions The PL-DPP demonstrated feasibility, acceptability, and preliminary effectiveness in a high-risk population of Latinas. Future research examining this intervention in a randomized clinical trial should explore factors impacting its effects using both qualitative and quantitative methods. PMID:26023095

  19. Preliminary Assessment of the Hanford Tank Waste Feed Acceptance and Product Qualification Programs

    SciTech Connect

    Herman, C. C.; Adamson, Duane J.; Herman, D. T.; Peeler, David K.; Poirier, Micheal R.; Reboul, S. H.; Stone, M. E.; Peterson, Reid A.; Chun, Jaehun; Fort, James A.; Vienna, John D.; Wells, Beric E.

    2013-04-01

    The U.S. Department of Energy Office of Environmental Management (EM) is engaging the national laboratories to provide the scientific and technological rigor to support EM program and project planning, technology development and deployment, project execution, and assessment of program outcomes. As an early demonstration of this new responsibility, Savannah River National Laboratory (SRNL) and Pacific Northwest National Laboratory (PNNL) have been chartered to implement a science and technology program addressing Hanford Tank waste feed acceptance and product qualification. As a first step, the laboratories examined the technical risks and uncertainties associated with the planned waste feed acceptance and qualification testing for Hanford tank wastes. Science and technology gaps were identified for work associated with 1) feed criteria development with emphasis on identifying the feed properties and the process requirements, 2) the Tank Waste Treatment and Immobilization Plant (WTP) process qualification program, and 3) the WTP HLW glass product qualification program. Opportunities for streamlining the accetpance and qualification programs were also considered in the gap assessment. Technical approaches to address the science and technology gaps and/or implement the opportunities were identified. These approaches will be further refined and developed as strong integrated teams of researchers from national laboratories, contractors, industry, and academia are brought together to provide the best science and technology solutions. Pursuing the identified approaches will have immediate and long-term benefits to DOE in reducing risks and uncertainties associated with tank waste removal and preparation, transfers from the tank farm to the WTP, processing within the WTP Pretreatment Facility, and in producing qualified HLW glass products. Additionally, implementation of the identified opportunities provides the potential for long-term cost savings given the anticipated

  20. Feasibility, Safety, Acceptability, and Preliminary Efficacy of Measurement-Based Care Depression Treatment for HIV Patients in Bamenda, Cameroon

    PubMed Central

    Pence, Brian W.; Gaynes, Bradley N.; Atashili, Julius; O'Donnell, Julie K.; Kats, Dmitry; Whetten, Kathryn; Njamnshi, Alfred K.; Mbu, Tabenyang; Kefie, Charles; Asanji, Shantal; Ndumbe, Peter

    2014-01-01

    Background Depression affects 18-30% of HIV-infected patients in Africa and is associated with greater stigma, lower antiretroviral adherence, and faster disease progression. However, the region's health system capacity to effectively identify and treat depression is limited. Task-shifting models may help address this large mental health treatment gap. Methods Measurement-Based Care (MBC) is a task-shifting model in which a Depression Care Manager (DCM) guides a non-psychiatric (e.g., HIV) provider in prescribing and managing antidepressant treatment. We adapted MBC for depressed HIV-infected patients in Cameroon and completed a pilot study to assess feasibility, safety, acceptability, and preliminary efficacy. Results We enrolled 55 participants; all started amitriptyline 25-50mg daily at baseline. By 12 weeks, most remained at 50mg daily (range 25-125mg). Median (interquartile range) PHQ-9 depressive severity scores declined from 13 (12-16) (baseline) to 2 (0-3) (week 12); 87% achieved depression remission (PHQ9<5) by 12 weeks. Intervention fidelity was high: HIV providers followed MBC recommendations at 96% of encounters. Most divergences reflected a failure to increase dose when indicated. No serious and few bothersome side effects were reported. Most suicidality (prevalence: 62% at baseline; 8% at 12 weeks) was either passive or low-risk. Participant satisfaction was high (100%), and most participants (89%) indicated willingness to pay for medications if MBC were implemented in routine care. Conclusions The adapted MBC intervention demonstrated high feasibility, safety, acceptability, and preliminary efficacy in this uncontrolled pilot study. Further research should assess whether MBC could improve adherence and HIV outcomes in this setting. PMID:24558099

  1. 75 FR 26208 - Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-11

    ... tethering device, pending evaluation of specific site conditions; (2) eight 25-kW Red Hawk in- stream... underwater transmission line connecting the Red Hawk modules to an existing above-ground local...

  2. Special endpoint and product specific considerations in pharmaceutical acceptable daily exposure derivation.

    PubMed

    Gould, Janet; Callis, Courtney M; Dolan, David G; Stanard, Brad; Weideman, Patricia A

    2016-08-01

    Recently, a guideline has been published by the European Medicines Agency (EMA) on setting safe limits, permitted daily exposures (PDE) [also called acceptable daily exposures (ADE)], for medicines manufactured in multi-product facilities. The ADE provides a safe exposure limit for inadvertent exposure of a drug due to cross-contamination in manufacturing. The ADE determination encompasses a standard risk assessment, requiring an understanding of the toxicological and pharmacological effects, the mechanism of action, drug compound class, and the dose-response as well as the pharmacokinetic properties of the compound. While the ADE concept has broad application in pharmaceutical safety there are also nuances and specific challenges associated with some toxicological endpoints or drug product categories. In this manuscript we discuss considerations for setting ADEs when the following specific adverse health endpoints may constitute the critical effect: genotoxicity, developmental and reproductive toxicity (DART), and immune system modulation (immunostimulation or immunosuppression), and for specific drug classes, including antibody drug conjugates (ADCs), emerging medicinal therapeutic compounds, and compounds with limited datasets. These are challenging toxicological scenarios that require a careful evaluation of all of the available information in order to establish a health-based safe level. PMID:27233924

  3. 75 FR 66081 - Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-27

    ... owners' express permission. The proposed Killisnoo Project would consist of: (1) A moored test platform or dock, or underwater tethering device, pending evaluation of specific site conditions; (2) ten 25... printed on the ``eLibrary'' link of Commission's Web site at...

  4. Acceptability and Preliminary Outcomes of a Peer-Led Depression Prevention Intervention for African American Adolescents and Young Adults in Employment Training Programs

    ERIC Educational Resources Information Center

    Tandon, Darius; Mendelson, Tamar; Mance, GiShawn

    2011-01-01

    This study examines the acceptability and preliminary outcomes from an open trial of a depression prevention intervention for low-income African American adolescents and young adults in employment training programs. The sample (N=42) consisted of predominately African American adolescents and young adults (mean age=19.1) exhibiting subclinical…

  5. A Mixed-methods Evaluation of the Feasibility, Acceptability and Preliminary Efficacy of a Mobile Intervention for Methadone Maintenance Clients

    PubMed Central

    Guarino, Honoria; Acosta, Michelle; Marsch, Lisa A.; Xie, Haiyi; Aponte-Melendez, Yesenia

    2015-01-01

    Despite the recent explosion of behavioral health interventions delivered on mobile devices, little is known about factors that make such applications practical, engaging and useful to their target audience. This study reports on the feasibility, acceptability and preliminary efficacy of a prototype of a novel, interactive mobile psychosocial intervention to reduce problematic drug use among clients in methadone maintenance treatment (MMT). A mixed-methods pilot study with new MMT clients (n=25) indicated that the mobile intervention approach was feasible, and that participants found the intervention highly acceptable and useful. On 100-point visual analog scale (VAS) items, participants reported high levels of liking the program (M=75.6), and endorsed it as useful (M=77.5), easy to use (M=80.7), and containing a significant amount of new information (M=74.8). When compared with 25 study participants who received standard MMT alone, pilot participants rated their treatment significantly higher in interestingness and usefulness, and were significantly more satisfied with their treatment. In qualitative interviews, participants reported using the mobile intervention in a range of settings, including during times of heightened risk for substance use, and finding it helpful in managing drug cravings. Additionally, pilot participants showed evidence of increased treatment retention and abstinence from illicit opioids (in terms of effect size) over a 3-month period relative to those in standard MMT, suggesting the application’s potential to enhance treatment outcomes. These promising findings suggest that an evidence-based mobile therapeutic tool addressing substance use may appeal to drug treatment clients and have clinical utility as an adjunct to formal treatment. PMID:26618796

  6. Advanced Free Flight Planner and Dispatcher's Workstation: Preliminary Design Specification

    NASA Technical Reports Server (NTRS)

    Wilson, J.; Wright, C.; Couluris, G. J.

    1997-01-01

    The National Aeronautics and Space Administration (NASA) has implemented the Advanced Air Transportation Technology (AATT) program to investigate future improvements to the national and international air traffic management systems. This research, as part of the AATT program, developed preliminary design requirements for an advanced Airline Operations Control (AOC) dispatcher's workstation, with emphasis on flight planning. This design will support the implementation of an experimental workstation in NASA laboratories that would emulate AOC dispatch operations. The work developed an airline flight plan data base and specified requirements for: a computer tool for generation and evaluation of free flight, user preferred trajectories (UPT); the kernel of an advanced flight planning system to be incorporated into the UPT-generation tool; and an AOC workstation to house the UPT-generation tool and to provide a real-time testing environment. A prototype for the advanced flight plan optimization kernel was developed and demonstrated. The flight planner uses dynamic programming to search a four-dimensional wind and temperature grid to identify the optimal route, altitude and speed for successive segments of a flight. An iterative process is employed in which a series of trajectories are successively refined until the LTPT is identified. The flight planner is designed to function in the current operational environment as well as in free flight. The free flight environment would enable greater flexibility in UPT selection based on alleviation of current procedural constraints. The prototype also takes advantage of advanced computer processing capabilities to implement more powerful optimization routines than would be possible with older computer systems.

  7. Preliminary Transportation, Aging and Disposal Canister System Performance Specification

    SciTech Connect

    C.A Kouts

    2006-11-22

    This document provides specifications for selected system components of the Transportation, Aging and Disposal (TAD) canister-based system. A list of system specified components and ancillary components are included in Section 1.2. The TAD canister, in conjunction with specialized overpacks will accomplish a number of functions in the management and disposal of spent nuclear fuel. Some of these functions will be accomplished at purchaser sites where commercial spent nuclear fuel (CSNF) is stored, and some will be performed within the Office of Civilian Radioactive Waste Management (OCRWM) transportation and disposal system. This document contains only those requirements unique to applications within Department of Energy's (DOE's) system. DOE recognizes that TAD canisters may have to perform similar functions at purchaser sites. Requirements to meet reactor functions, such as on-site dry storage, handling, and loading for transportation, are expected to be similar to commercially available canister-based systems. This document is intended to be referenced in the license application for the Monitored Geologic Repository (MGR). As such, the requirements cited herein are needed for TAD system use in OCRWM's disposal system. This document contains specifications for the TAD canister, transportation overpack and aging overpack. The remaining components and equipment that are unique to the OCRWM system or for similar purchaser applications will be supplied by others.

  8. Preliminary design of the Carrisa Plains solar central receiver power plant. Volume II. Plant specifications

    SciTech Connect

    Price, R. E.

    1983-12-31

    The specifications and design criteria for all plant systems and subsystems used in developing the preliminary design of Carrisa Plains 30-MWe Solar Plant are contained in this volume. The specifications have been organized according to plant systems and levels. The levels are arranged in tiers. Starting at the top tier and proceeding down, the specification levels are the plant, system, subsystem, components, and fabrication. A tab number, listed in the index, has been assigned each document to facilitate document location.

  9. Substrate specificity in enzymatic fluorination. The fluorinase from Streptomyces cattleya accepts 2′-deoxyadenosine substrates†

    PubMed Central

    Cobb, Steven L.; Deng, Hai; McEwan, Andrew R.; Naismith, James H.; O’Hagan, David; Robinson, David A.

    2012-01-01

    The fluorinase enzyme from Streptomyces cattleya displays an unusual ability in biocatalysis in that it forms a C–F bond. We now report that the enzyme will accept 2′-deoxyadenosine in place of adenosine substrates, and structural evidence reveals a reorganisation in hydrogen bonding to accommodate this substrate series. It emerges from this study that the enzyme does not require a planar ribose conformation of the substrate to catalyse C–F bond formation. PMID:16604208

  10. 76 FR 30936 - West Maui Pumped Storage Water Supply, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-27

    ... Maui Pumped Storage Project, which would use effluent water from the existing West Maui sewage... Energy Regulatory Commission West Maui Pumped Storage Water Supply, LLC; Notice of Preliminary Permit... April 1, 2011, West Maui Pumped Storage Water Supply, LLC, filed an application for a preliminary...

  11. 77 FR 34033 - American River Power IX, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-08

    ...--Hydroelectric Water Power Project (Peoria Dam Project or project) to be located at the U.S. Army Corps of... Energy Regulatory Commission American River Power IX, LLC; Notice of Preliminary Permit Application..., 2012, American River Power IX, LLC filed an application for a preliminary permit, pursuant to section...

  12. 77 FR 41783 - American River Power VII, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-16

    ... Hydroelectric Water Power Project No. 14389, to be located at the existing Lower Appleton Dam on the Fox River... Energy Regulatory Commission American River Power VII, LLC; Notice of Preliminary Permit Application..., 2012, American River Power VII, LLC filed an application for a preliminary permit under section 4(f)...

  13. 77 FR 41783 - American River Power VI, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-16

    ... Water Power Project No. 14392, to be located at the existing La Grange Dam on the Illinois River, near... Energy Regulatory Commission American River Power VI, LLC; Notice of Preliminary Permit Application..., 2012, the American River Power VI, LLC filed an application for a preliminary permit under section...

  14. 77 FR 41782 - American River Power VIII, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-16

    ... Hydroelectric Water Power Project No. 14391, to be located at the existing Upper Appleton Dam on the Fox River... Energy Regulatory Commission American River Power VIII, LLC; Notice of Preliminary Permit Application..., 2012, American River Power VIII, LLC filed an application for a preliminary permit under section...

  15. 77 FR 34032 - American River Power III, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-08

    ... Water Power Project No. 14375, to be located at the existing Dillon Lake Dam on the Licking River, near... Energy Regulatory Commission American River Power III, LLC; Notice of Preliminary Permit Application..., 2012, the American River Power III, LLC filed an application for a preliminary permit under section...

  16. 76 FR 58261 - American River Power I, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-20

    ... Chute, Ohio--Water Power No. 14258 to be located at the existing Luke Chute Lock and Dam on the... Energy Regulatory Commission American River Power I, LLC; Notice of Preliminary Permit Application..., 2011, American River Power I, LLC (American River) filed an application for a preliminary...

  17. 76 FR 58262 - American River Power I, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-20

    ..., Ohio--Water Power Project No. 14257 to be located at the existing Ellis Ohio Lock Dam No. 11 on the... Energy Regulatory Commission American River Power I, LLC; Notice of Preliminary Permit Application..., 2011, American River Power I, LLC (American River) filed an application for a preliminary...

  18. 75 FR 352 - FFP Qualified Hydro 18 LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-05

    ... Federal Energy Regulatory Commission FFP Qualified Hydro 18 LLC; Notice of Preliminary Permit Application..., 2009. On September 8, 2009, FFP Qualified Hydro 18 LLC filed an application for a preliminary permit... competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and...

  19. 76 FR 8729 - Bison Peak Pumped Storage, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-15

    ... Energy Regulatory Commission Bison Peak Pumped Storage, LLC; Notice of Preliminary Permit Application..., 2010, the Bison Peak Pumped Storage, LLC., filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Bison Peak...

  20. 76 FR 62399 - Bison Peak Pumped Storage, LLC.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-07

    ... Energy Regulatory Commission Bison Peak Pumped Storage, LLC.; Notice of Preliminary Permit Application..., 2011, the Bison Peak Pumped Storage, LLC., filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Bison Peak...

  1. 75 FR 27769 - Lock+ Hydro Friends Fund VII; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-18

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Lock+ Hydro Friends Fund VII; Notice of Preliminary Permit Application.... On April 13, 2010 Lock+ Hydro Friends Fund VII filed an application for a preliminary...

  2. 76 FR 52656 - Lock+Hydro Friends Fund VII; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-23

    ... Energy Regulatory Commission Lock+Hydro Friends Fund VII; Notice of Preliminary Permit Application..., 2011, Lock+Hydro Friends Fund VII, filed an application for a preliminary permit, pursuant to section 4.... Applicant Contact: Mr. Wayne Krouse, Lock + Hydro Friends Fund VII, 5090 Richmond Avenue 390, Houston,...

  3. 77 FR 14516 - Lock+ Hydro Friends Fund VII; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-12

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Lock+ Hydro Friends Fund VII; Notice of Preliminary Permit Application... 22, 2011, Lock+ Hydro Friends Fund VII filed an application for a preliminary permit under section...

  4. 75 FR 353 - FFP Qualified Hydro 20 LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-05

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Qualified Hydro 20 LLC; Notice of Preliminary Permit Application..., 2009. On September 4, 2009, FFP Qualified Hydro 20 LLC filed an application for a preliminary...

  5. 78 FR 20101 - Free Flow Power Iowa 1, LLC; Notice of Successive Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-03

    ... Energy Regulatory Commission Free Flow Power Iowa 1, LLC; Notice of Successive Preliminary Permit... January 2, 2013, Free Flow Power Iowa 1, LLC (FFP Iowa) filed an application for a preliminary permit....4 gigawatt-hours. Applicant Contact: Daniel Lissner, Free Flow Power Corporation, 239...

  6. 77 FR 55212 - North Star Hydro Services CA, LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... Energy Regulatory Commission North Star Hydro Services CA, LLC; Notice of Preliminary Permit Application..., 2012, North Star Hydro Services CA, LLC, Oklahoma, filed an application for a preliminary permit...: David Holland, North Star Hydro Services CA, LLC, 1110 West 131st Street South, Jenks, Oklahoma...

  7. 77 FR 55212 - North Star Hydro Services CA, LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... Energy Regulatory Commission North Star Hydro Services CA, LLC; Notice of Preliminary Permit Application..., 2012, North Star Hydro Services CA, LLC, Oklahoma, filed an application for a preliminary permit... Holland, North Star Hydro Services CA, LLC, 1110 West 131st Street South, Jenks, Oklahoma 74037;...

  8. 76 FR 10578 - Cuffs Run Pumped Storage, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-25

    ... Energy Regulatory Commission Cuffs Run Pumped Storage, LLC; Notice of Preliminary Permit Application... 18, 2010, Cuffs Run Pumped Storage, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Cuffs Run Pumped...

  9. 78 FR 54889 - Lock+ Hydro Friends Fund XIX, LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-06

    ... Energy Regulatory Commission Lock+ Hydro Friends Fund XIX, LLC; Notice of Preliminary Permit Application..., 2013, Lock+ Hydro Friends Fund XIX, LLC filed an application for a preliminary permit, pursuant to.... Wayne Krouse, Lock+ Hydro Friends Fund, LLC, 4900 Woodway, Suite 745 Houston, TX 77056; Phone: (877)...

  10. 78 FR 59926 - Lock+ Hydro Friends Fund XIX, LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-30

    ... Energy Regulatory Commission Lock+ Hydro Friends Fund XIX, LLC; Notice of Preliminary Permit Application..., 2013, Lock+ Hydro Friends Fund XIX, LLC filed an application for a preliminary permit, pursuant to.... Wayne Krouse, Lock+ Hydro Friends Fund, LLC, 4900 Woodway, Suite 745 Houston, TX 77056; Phone: (877)...

  11. 78 FR 58301 - Go With the Flow Hydro Power, LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-23

    ... Energy Regulatory Commission Go With the Flow Hydro Power, LLC; Notice of Preliminary Permit Application..., 2013, Go with the Flow Hydro Power, LLC, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Go with the...

  12. 75 FR 47586 - New York Tidal Energy Company; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-06

    ... Energy Regulatory Commission New York Tidal Energy Company; Notice of Preliminary Permit Application.... On May 12, 2010, New York Tidal Energy Company filed an application for a preliminary permit.... The proposed project would consist of the following: (1) 50 to 150 Tidal In Stream Energy...

  13. 75 FR 47586 - New York Tidal Energy Company; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-06

    ... Energy Regulatory Commission New York Tidal Energy Company; Notice of Preliminary Permit Application.... On May 12, 2010, New York Tidal Energy Company filed an application for a preliminary permit... Tidal Energy Pilot Project, located on the East River, in New York City, New York. The sole purpose of...

  14. 75 FR 351 - FFP Qualified Hydro 21 LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-05

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Qualified Hydro 21 LLC; Notice of Preliminary Permit Application..., 2009. On September 4, 2009, FFP Qualified Hydro 21 LLC filed an application for a preliminary...

  15. 77 FR 24195 - Green River Energy BFD, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-23

    ... Energy Regulatory Commission Green River Energy BFD, LLC; Notice of Preliminary Permit Application..., 2012, Green River Energy BFD, LLC filed an application for a preliminary permit, pursuant to section 4... located at the U.S. Army Corps of Engineers' (Corps) Green River Lake Dam, located on the Green River...

  16. 76 FR 54765 - Lock+ Hydro Friends Fund IV; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-02

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Lock+ Hydro Friends Fund IV; Notice of Preliminary Permit Application..., 2011, the Lock+ Hydro Friends Fund IV filed an application for a preliminary permit under section...

  17. 75 FR 53963 - Iron Mask Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-02

    ... Federal Energy Regulatory Commission Iron Mask Hydro, LLC; Notice of Preliminary Permit Application..., 2010. On May 6, 2010, Iron Mask Hydro, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Iron Mask...

  18. 75 FR 27548 - Quality GearBox, LLC; Notice of Competing Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-17

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Quality GearBox, LLC; Notice of Competing Preliminary Permit Application..., Quality GearBox, LLC (Quality GearBox) filed an application for a preliminary permit, pursuant to...

  19. 77 FR 7143 - Green Wave Mendocino Wave Park; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-10

    ... Federal Energy Regulatory Commission Green Wave Mendocino Wave Park; Notice of Preliminary Permit... September 23, 2011, Green Wave Energy Solutions, LLC, California, filed an application for a preliminary... the Green Wave Mendocino Wave Park (Mendocino Wave Project or project) to be located in the...

  20. 78 FR 30916 - FFP Project 117, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-23

    ... Project 117, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal...-foot-high concrete dam; (2) a reservoir with a surface area of 295 acres and a storage capacity of...

  1. 78 FR 30917 - FFP Project 116, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-23

    ... Project 116, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal...- foot-long, 36-foot-high concrete dam with a 294-foot-long spillway; (2) a reservoir with a surface...

  2. 76 FR 34071 - Lock Hydro Friends Fund I; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-10

    ..., proposing to study the feasibility of hydropower at the City of Austin's Longhorn Dam located on the Lower Colorado River in Travis County, Texas. The sole purpose of a preliminary permit, if issued, is to...

  3. 77 FR 29537 - Standards and Specifications for Timber Products Acceptable for Use by Rural Utilities Service...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-18

    ...The Rural Utilities Service published a final rule in the Federal Register on June 24, 2011, which amended its regulations on Electric and Telecommunications Standards and Specifications for Materials, Equipment and Construction, by codifying specifications for wood poles, stubs and anchor logs, wood crossarms (solid and laminated), transmission timbers and pole keys, and for quality control......

  4. Teachers' Acceptance of Absenteeism: Towards Developing a Specific Scale

    ERIC Educational Resources Information Center

    Shapira-Lishchinsky, Orly; Ishan, Gamal

    2013-01-01

    Purpose: This study aims to develop and validate a measure of a specific attitude toward teachers' absenteeism that predicts this behavior more accurately than other general measures of job attitudes. Design/methodology/approach: Participants were 443 teachers from 21 secondary schools in Israel. In the first phase, the teachers answered…

  5. 78 FR 60271 - Mid-Atlantic Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-01

    ..., 2013, Mid-Atlantic Hydro, LLC filed an application for a preliminary permit, pursuant to section 4(f... to the existing outlet; (2) a concrete powerhouse to be located on the right descending bank; (3) 6- megawatt (MW) and 3-MW generators for a total installed capacity of 9.0 MW; (4) a concrete tailrace...

  6. 78 FR 77118 - KC Small Hydro, LLC; Notice of Amended Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-20

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission KC Small Hydro, LLC; Notice of Amended Preliminary Permit Application... application to change its name to KC Small Hydro, LLC. Pursuant to 18 CFR 4.35, the August 28, 2013, Notice...

  7. 75 FR 11150 - Free Flow Power Qualified Hydro 23, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-10

    ... Energy Regulatory Commission Free Flow Power Qualified Hydro 23, LLC; Notice of Preliminary Permit... March 3, 2010. On November 5, 2009, Free Flow Power Qualified Hydro 23, LLC (FFP Qualified Hydro 23...-free 1-866-208-3372. Kimberly D. Bose, Secretary. BILLING CODE 6717-01-P...

  8. 75 FR 11153 - Free Flow Power Qualified Hydro 22, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-10

    ... Energy Regulatory Commission Free Flow Power Qualified Hydro 22, LLC; Notice of Preliminary Permit... March 1, 2010. On November 05, 2009, Free Flow Power Qualified Hydro 22, LLC (FFP Qualified Hydro 22...-free 1-866-208-3372. Kimberly D. Bose, Secretary. BILLING CODE 6717-01-P...

  9. 76 FR 48853 - FFP Project 70, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-09

    ... and Dam 19 Water Power Project (Mississippi Lock and Dam 19 Project or project) to be located at the... generation of the Mississippi Lock and Dam 19 Water Power Project would be 200 gigawatt-hours. Applicant..., 2011, Free Flow Power Project 70, LLC filed an application for a preliminary permit, pursuant...

  10. 77 FR 40354 - Mesa de Los Carros Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-09

    ... Energy Regulatory Commission Mesa de Los Carros Hydro, LLC; Notice of Preliminary Permit Application..., 2012, Mesa De Los Carros Hydro, LLC filed an application, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Mesa De Los Carros Pumped Storage Project to...

  11. 75 FR 27770 - Lock+ Hydro Friends Fund VIII; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-18

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Lock+ Hydro Friends Fund VIII; Notice of Preliminary Permit... 11, 2010. On April 13, 2010 Lock+ Hydro Friends Fund VIII filed an application for a...

  12. 76 FR 5585 - City of Astoria, OR; Notice of Competing Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-01

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission City of Astoria, OR; Notice of Competing Preliminary Permit Application... vault housing a single 40-kilowatt (kW) turbine/generator unit; and (2) an approximately...

  13. 77 FR 25163 - KC Hydro LLC of New Hampshire; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-27

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission KC Hydro LLC of New Hampshire; Notice of Preliminary Permit Application... powerhouse containing a single turbine generator unit with an installed capacity of 100 kilowatts; (5) a...

  14. 76 FR 5584 - City of Salem, OR; Notice of Competing Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-01

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission City of Salem, OR; Notice of Competing Preliminary Permit Application.../generator unit at an installed capacity of 0.5 megawatt (MW); and (3) a new standard flow meter to...

  15. 78 FR 41398 - City of Berlin, Berlin Water Works; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-10

    ... Water Treatment Plant Hydroelectric Project (Project) to be located on a water supply conduit at the City of Berlin's municipal water treatment plant (WTP), in Coos County, New Hampshire. The sole purpose... Energy Regulatory Commission City of Berlin, Berlin Water Works; Notice of Preliminary Permit...

  16. 76 FR 71961 - KC Hydro LLC of New Hampshire; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-21

    ... 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Manchester Goffs..., near the City of Manchester, Hillsborough County, New Hampshire. The sole purpose of a preliminary... Goffs Falls Dam, which is owned by the City of Manchester and includes a 75-foot-long spillway; (2)...

  17. 75 FR 66083 - Iron Mask Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-27

    ... Federal Energy Regulatory Commission Iron Mask Hydro, LLC; Notice of Preliminary Permit Application..., 2010. On May 6, 2010, and supplemented on July 15, 2010, Iron Mask Hydro, LLC filed an application for... the feasibility of the Iron Mask Pumped Storage Project to be located near the U.S. Bureau...

  18. 75 FR 21289 - Oregon Wave Energy Partners I, LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-23

    ... Energy Regulatory Commission Oregon Wave Energy Partners I, LLC; Notice of Preliminary Permit Application..., 2010. On March 2, 2010, Oregon Wave Energy Partners I, LLC filed an application for a subsequent... the Coos Bay OPT Wave Park Project. The requested project boundary comprises approximately 7.36...

  19. 75 FR 38799 - Reedsport OPT Wave Park, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-06

    ... Energy Regulatory Commission Reedsport OPT Wave Park, LLC; Notice of Preliminary Permit Application.... Reedsport OPT Wave Park, LLC filed on February 2, 2010 and amended on May 27, 2010, an application for a... the Reedsport OPT Wave Park Phase III Project located in the Pacific Ocean about 2.5 miles west...

  20. 76 FR 48852 - FFP Project 42 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-09

    ..., proposing to study the feasibility of hydropower on the Mississippi River, near Memphis, in Shelby County, Tennessee and near West Memphis, in Crittenden County Arkansas. The sole purpose of a preliminary permit, if... units installed in arrays on the bottom of the river; (2) the total capacity of the installation...

  1. Preliminary level 2 specification for the nested, fixed-depth sampling system

    SciTech Connect

    BOGER, R.M.

    1999-02-08

    This preliminary Level 2 Component Specification establishes the performance, design, development, and test requirements for the in-tank sampling system which will support the BNFL contract in the final disposal of Hanford's High Level Wastes (HLW) and Low Activity Wastes (LAW). The PHMC will provide Low Activity Wastes (LAW) tank wastes for final treatment by BNFL from double-shell feed tanks. Concerns about the inability of the baseline ''grab'' sampling to provide large volume samples within time constraints has led to the development of a nested, fixed-depth sampling system. This sampling system will provide large volume? representative samples without the environmental, radiation exposure, and sample volume Impacts of the current base-line ''grab'' sampling method. This preliminary Level 2 Component Specification is not a general specification for tank sampling, but is based on a ''record of decision'', AGA (HNF-SD-TWR-AGA-001 ), the System Specification for the Double Shell Tank System (HNF-SD-WM-TRD-O07), and the BNFL privatization contract.

  2. Toward optimizing patient-specific IMRT QA techniques in the accurate detection of dosimetrically acceptable and unacceptable patient plans

    SciTech Connect

    McKenzie, Elizabeth M.; Balter, Peter A.; Stingo, Francesco C.; Jones, Jimmy; Followill, David S.; Kry, Stephen F.

    2014-12-15

    Purpose: The authors investigated the performance of several patient-specific intensity-modulated radiation therapy (IMRT) quality assurance (QA) dosimeters in terms of their ability to correctly identify dosimetrically acceptable and unacceptable IMRT patient plans, as determined by an in-house-designed multiple ion chamber phantom used as the gold standard. A further goal was to examine optimal threshold criteria that were consistent and based on the same criteria among the various dosimeters. Methods: The authors used receiver operating characteristic (ROC) curves to determine the sensitivity and specificity of (1) a 2D diode array undergoing anterior irradiation with field-by-field evaluation, (2) a 2D diode array undergoing anterior irradiation with composite evaluation, (3) a 2D diode array using planned irradiation angles with composite evaluation, (4) a helical diode array, (5) radiographic film, and (6) an ion chamber. This was done with a variety of evaluation criteria for a set of 15 dosimetrically unacceptable and 9 acceptable clinical IMRT patient plans, where acceptability was defined on the basis of multiple ion chamber measurements using independent ion chambers and a phantom. The area under the curve (AUC) on the ROC curves was used to compare dosimeter performance across all thresholds. Optimal threshold values were obtained from the ROC curves while incorporating considerations for cost and prevalence of unacceptable plans. Results: Using common clinical acceptance thresholds, most devices performed very poorly in terms of identifying unacceptable plans. Grouping the detector performance based on AUC showed two significantly different groups. The ion chamber, radiographic film, helical diode array, and anterior-delivered composite 2D diode array were in the better-performing group, whereas the anterior-delivered field-by-field and planned gantry angle delivery using the 2D diode array performed less well. Additionally, based on the AUCs, there

  3. 76 FR 18755 - Lock Hydro Friends Fund LII; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-05

    ... Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On July 12... filing comments, motions to intervene, competing applications (without notices of intent), or notices of... and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to...

  4. 76 FR 18755 - Lock Hydro Friends Fund LI; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-05

    ... Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On July 16...-6093. Deadline for filing comments, motions to intervene, competing applications (without notices of.... Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions...

  5. 76 FR 20973 - FFP Qualified Hydro 24, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-14

    ... Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On September...-1531. FERC Contact: Kelly Wolcott; phone: (202) 502-6480. Deadline for filing comments, motions to... the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and...

  6. Microneedle characterisation: the need for universal acceptance criteria and GMP specifications when moving towards commercialisation.

    PubMed

    Lutton, Rebecca E M; Moore, Jessica; Larrañeta, Eneko; Ligett, Stephen; Woolfson, A David; Donnelly, Ryan F

    2015-08-01

    With interest in microneedles as a novel drug transdermal delivery system increasing rapidly since the late 1990s (Margetts and Sawyer Contin Educ Anaesthesia Crit Care Pain. 7(5):171-76, 2007), a diverse range of microneedle systems have been fabricated with varying designs and dimensions. However, there are still very few commercially available microneedle products. One major issue regarding microneedle manufacture on an industrial scale is the lack of specific quality standards for this novel dosage form in the context of Good Manufacturing Practice (GMP). A range of mechanical characterisation tests and microneedle insertion analysis techniques are used by researchers working on microneedle systems to assess the safety and performance profiles of their various designs. The lack of standardised tests and equipment used to demonstrate microneedle mechanical properties and insertion capability makes it difficult to directly compare the in use performance of candidate systems. This review highlights the mechanical tests and insertion analytical techniques used by various groups to characterise microneedles. This in turn exposes the urgent need for consistency across the range of microneedle systems in order to promote innovation and the successful commercialisation of microneedle products. PMID:26022578

  7. Non-myeloablative conditioning is sufficient to induce mixed chimerism and subsequent acceptance of donor specific cardiac and skin grafts.

    PubMed

    Liu, Chi; Zhu, Ping; Saito, Taro; Isaka, Yoshitaka; Nagahara, Yukitoshi; Zhuang, Jian; Li, Xiao-Kang

    2013-07-01

    Organ transplant recipients have elevated cancer and viral infection risks due to immunosuppression and long-term results of organ transplantation remain unsatisfactory, mainly because of chronic rejection. The purpose of the current study is to establish a nonmyeloablative perioperative regimen, able to induce mixed chimerism and tolerance of allografts. To establish a nonmyeloablative perioperative regimen, we used Busulfan, an important component of many bone marrow transplantation preparative regimens for a variety of non-neoplastic diseases as an alternative to total body irradiation (TBI), and FTY720, a unique immunosuppression agent, inhibition lymphocyte homing. We found that creating a lymphohematopoietic chimera in which donor and recipient hematopoiesis coexist resulted in prolongation of the donor specific heart and skin allografts. Consistent with graft survival, pathological analysis indicated that the allografts from tolerant recipients were free of myocardial injury and had only a few interstitial infiltrates, and obliterative vasculopathy was not observed. Furthermore, we found that Treg cells were increased in the long-term graft acceptance recipients. Our data revealed that the therapeutic potential for using hematopoietic chimerism in non-myeloablated recipients hope the advances in rodent models described above in the development of minimal, nontoxic host conditioning regimens for mixed chimerism induction and subsequent acceptance of donor specific grafts. PMID:23428909

  8. The MyPEEPS randomized controlled trial: A pilot of preliminary efficacy, feasibility, and acceptability of a group-level, HIV risk reduction intervention for young men who have sex with men

    PubMed Central

    Hidalgo, Marco A.; Kuhns, Lisa M.; Hotton, Anna L.; Johnson, Amy K.; Mustanski, Brian; Garofalo, Robert

    2015-01-01

    An exigent need exists for HIV prevention intervention research targeting young men who have sex with men (MSM) – a group of young adults that, despite composing the highest and most racially disproportionate rates of HIV incidence, has been least often the focus of behavioral intervention research. This pilot study tested a group-based HIV primary prevention intervention for young MSM to evaluate its initial efficacy, feasibility, and acceptability. Participants were randomized (N=101; aged 16-20 years) to one of two group-level, HIV and STI education programs: controls participated in a non-interactive, lecture-based program while intervention participants took part in a highly interactive program tailored to young MSM aged 16-20. Sexual risk and social cognitive outcomes were assessed at baseline, and 6- and 12 weeks post-intervention. Over the entire follow-up period, intervention participants were less likely than controls to engage in any sexual behavior while under the influence of substances (p<0.05), and also observed in this group was a decreasing trend of unprotected anal sex while under the influence of substances (p=.08). Follow-up differences between groups on social cognitive outcomes favored the intervention group, though these differences were non-significant. Acceptability ratings were modest. A 6-session behavioral intervention tailored to young MSM, aged 16-20, is feasible, acceptable, and demonstrates evidence of preliminary efficacy in reducing sexual risk, specifically sexual risk while under the influence of substances. PMID:25135064

  9. Acceptance and commitment therapy in youth with neurofibromatosis type 1 (NF1) and chronic pain and their parents: A pilot study of feasibility and preliminary efficacy.

    PubMed

    Martin, Staci; Wolters, Pamela L; Toledo-Tamula, Mary Anne; Schmitt, Shawn Nelson; Baldwin, Andrea; Starosta, Amy; Gillespie, Andrea; Widemann, Brigitte

    2016-06-01

    Neurofibromatosis type 1 (NF1) is an autosomal dominant genetic disorder affecting about 1 in 3,500 individuals. Chronic pain is commonly reported among individuals with NF1 and plexiform neurofibroma tumors (PNs). Acceptance and Commitment Therapy (ACT), an empirically supported method for addressing chronic pain, helps individuals re-focus on valued relationships and activities. This pilot study investigated the feasibility and preliminary efficacy of a brief ACT workshop in the NF1 population. Eligible participants included adolescents and young adults (AYA; 12-21 years) with NF1 and chronic pain that interfered with daily functioning and their parents. Patients and parents completed baseline measures of pain interference, pain intensity, functional disability, pain acceptance, depression, and anxiety. Then, AYA and parents participated separately in a 2-day small-group ACT workshop. A telephone booster session occurred 1 month post-intervention. Three-month post-treatment measures were completed by mail. Ten adolescents (4 males; M age = 16.9 years) and seven parents provided baseline and 3-month data. Mean satisfaction with the study was moderate to high (3.9 for patients and 4.6 for parents on a 1-5 scales). Patients and parents reported significant declines in patients' pain interference at 3 months post-treatment. Patient-reported pain intensity significantly declined from baseline to 3 months. Parents reported marginally greater acceptance of their child's pain. No changes emerged in functional ability or mood. Preliminary findings suggest that a brief ACT group intervention is feasible and may help AYA with NF1 and PNs cope with their chronic pain, although larger randomized studies are needed to confirm treatment efficacy. © 2016 Wiley Periodicals, Inc. PMID:27021207

  10. Internet-enabled pulmonary rehabilitation and diabetes education in group settings at home: a preliminary study of patient acceptability

    PubMed Central

    2013-01-01

    Background The prevalence of major chronic illnesses, such as chronic obstructive pulmonary disease (COPD) and diabetes, is increasing. Pulmonary rehabilitation and diabetes self-management education are important in the management of COPD and diabetes respectively. However, not everyone can participate in the programmes offered at a hospital or other central locations, for reasons such as travel and transport. Internet-enabled home-based programmes have the potential to overcome these barriers. This study aims to assess patient acceptability of the delivery form and components of Internet-enabled programmes based on home groups for comprehensive pulmonary rehabilitation and for diabetes self-management education. Methods We have developed Internet-enabled home programmes for comprehensive pulmonary rehabilitation and for diabetes self-management education that include group education, group exercising (COPD only), individual consultations, educational videos and a digital health diary. Our prototype technology platform makes use of each user’s own TV at home, connected to a computer, and a remote control. We conducted a six-week home trial with 10 participants: one group with COPD and one with diabetes. The participants were interviewed using semi-structured interviews. Results Both home-based programmes were well accepted by the participants. The group setting at home made it possible to share experiences and to learn from questions raised by others, as in conventional group education. In the sessions, interaction and discussion worked well, despite the structure needed for turn taking. The thematic educational videos were well accepted although they were up to 40 minutes long and their quality was below TV broadcasting standards. Taking part in group exercising at home under the guidance of a physiotherapist was also well accepted by the participants. Participants in the COPD group appreciated the social aspect of group education sessions and of exercising

  11. Nevada Nuclear Waste Storage Investigations Project interim acceptance specifications for Defense Waste Processing Facility and West Valley Demonstration Project waste forms and canisterized waste

    SciTech Connect

    Oversby, V.M.

    1984-08-01

    The waste acceptance specifications presented in this document represent the first stage of the Nevada Nuclear Waste Storage Investigations Project effort to establish specifications for the acceptance of waste forms for disposal at a nuclear waste repository in Yucca Mountain tuff. The only waste forms that will be dealt with in this document are the reprocessed waste forms resulting from solidification of the Savannah River Plant defense high level waste and the West Valley high level wastes. Specifications for acceptance of spent fuel will be covered in a separate document.

  12. Preliminary flight software specification for the petite amateur Navy satellite (PANSAT)

    NASA Astrophysics Data System (ADS)

    Ford, Teresa O.

    1994-03-01

    PANSAT is a small, spread-spectrum, communications satellite under design at the Naval Postgraduate School. It will support a store and forward bulletin board system for use by the amateur radio community. The flight software is responsible for the autonomous telemetry collection and hardware control operations of the satellite, communications and file transfer protocols allowing access to the bulletin board system, and command interpretation and response to ground control commands. in this thesis, the complete flight software architecture and module interfaces are specified using the Estelle Format Description Technique. The module bodies dealing with communications and file transfer protocols are specified in detail in Estelle. The current design goat for the remainder of the flight software modules are discussed. Appendices include the preliminary flight software specification itself, a data flow diagram interpretation of the specification, and a summary of the Estelle syntax used.

  13. Feasibility, Acceptability, and Preliminary Efficacy of an Online HIV Prevention Program for Diverse Young Men who have Sex with Men: The Keep It Up! Intervention

    PubMed Central

    Mustanski, Brian; Garofalo, Robert; Monahan, Colleen; Gratzer, Beau; Andrews, Rebecca

    2013-01-01

    Young men who have sex with men (YMSM) are disproportionately infected with HIV/AIDS and there are few prevention programs with published efficacy for this population. This study evaluated the feasibility, acceptability, and preliminary efficacy of an online, interactive, and highly engaging HIV prevention program called Keep It Up! The intervention was designed to be delivered to diverse YMSM upon receiving an HIV negative text result, with the goal for them to “Keep It Up” and stay negative. In a randomized clinical trial, the intervention was compared to an online didactic HIV knowledge condition. The study sample included 102 sexually active YMSM. Participants reported completing online modules in settings that were private and not distracting. Mixed methods data showed intervention participants felt the program was valuable and acceptable. Compared to the control condition, participants in the intervention arm had a 44 % lower rate of unprotected anal sex acts at the 12-week follow-up (p < 0.05). PMID:23673793

  14. Randomized Controlled Trial of the Acceptability, Feasibility, and Preliminary Effects of a Cognitive Behavioral Skills Building Intervention in Adolescents with Chronic Daily Headaches: A Pilot Study

    PubMed Central

    Hickman, Carolyn; Jacobson, Diana; Melnyk, Bernadette

    2014-01-01

    Introduction The treatment challenge of adolescents with chronic daily headaches (CDHs) creates an urgent need for evidence-based interventions. Therefore, the purpose of this pilot study was to evaluate the acceptability, feasibility, and preliminary effects of a brief cognitive behavioral skills building intervention (CBSB) with thirty-six, 13-17 year-old, adolescents with CDHs and mild to moderate depressive symptoms. Methods Participants were randomly assigned either to the Creating Opportunities for Personal Empowerment Headache Education Program (COPE-HEP) or to a headache education comparison group. Results Adolescents and parents found the COPE-HEP to be highly acceptable. Medium to large positive effects were demonstrated on the adolescents’ depression in both groups and on anxiety and beliefs in the COPE-HEP group. COPE-HEP offered additional benefits of a larger decrease in adolescent anxiety over time and stronger beliefs in the teens’ ability to manage their headaches. Discussion Adolescents with CDHs and elevated depressive and anxiety symptoms should be offered headache hygiene education plus cognitive-behavioral skills building interventions. A full-scale trial to determine the more long-term benefits of COPE-HEP is now warranted. PMID:25017938

  15. Acceptability and feasibility of self-help Cognitive Remediation Therapy for anorexia nervosa delivered in collaboration with carers: a qualitative preliminary evaluation study.

    PubMed

    Lang, Katie; Treasure, Janet; Tchanturia, Kate

    2015-02-28

    Anorexia nervosa (AN) is an eating disorder without a recommended first-line treatment. Cognitive Remediation Therapy (CRT) is showing great promise in helping patients reduce cognitive inflexibility and excessive detail focus, thinking styles that could make engaging in psychological therapies difficult. CRT has shown to be effective, feasible and acceptable in both individual and group formats, and positive qualitative data has been gathered from both service users and clinicians. The aim of the current study was to assess the use of CRT as a self-help treatment for individuals with AN delivered in collaboration with carers. Six families underwent a six-week self-help CRT intervention. Feedback was gathered from qualitative interviews and analysed using thematic analysis. Neuropsychological outcomes were also collected. Participant feedback regarding the intervention was generally positive, with participants describing a number of benefits such as it creating a space for families to spend time together outside of the eating disorder, acting as a 'gateway' for more emotional work and helping participants to gain insight into their cognitive profiles. These preliminary findings suggest that self-help CRT delivered in collaboration with carers is an acceptable form of treatment, and adds to the growing literature supporting CRT for AN. PMID:25555418

  16. Feasibility, Acceptability, and Preliminary Efficacy of a Live-Chat Social Media Intervention to Reduce HIV Risk Among Young Men Who Have Sex With Men

    PubMed Central

    Pachankis, John E.; Gamarel, Kristi E.; Surace, Anthony; Golub, Sarit A.; Parsons, Jeffrey T.

    2014-01-01

    Given the popularity of social media among young men who have sex with men (YMSM), and in light of YMSM’s elevated and increasing HIV rates, we tested the feasibility, acceptability and preliminary efficacy of a live chat intervention delivered on Facebook in reducing condomless anal sex and substance use within a group of high risk YMSM in a pre-post design with no control group. Participants (N = 41; 18–29 years old) completed up to eight one-hour motivational interviewing and cognitive behavioral skills-based online live chat intervention sessions, and reported on demographic, psychosocial, and behavioral characteristics at baseline and immediately post-intervention. Analyses indicated that participation in the intervention (n = 31) was associated with reductions of days of drug and alcohol use in the past month and instances of anal sex without a condom (including under the influence of substances), as well as increases in knowledge of HIV-related risks at 3-month follow-up. This pilot study argues for the potential of this social media-delivered intervention to reduce HIV risk among a most vulnerable group in the United States, in a manner that was highly acceptable to receive and feasible to execute. A future randomized controlled trial could generate an intervention blueprint for providers to support YMSM’s wellbeing by reaching them regardless of their geographical location, at a low cost. PMID:25256808

  17. Feasibility, Acceptability, and Preliminary Efficacy of a Live-Chat Social Media Intervention to Reduce HIV Risk Among Young Men Who Have Sex With Men.

    PubMed

    Lelutiu-Weinberger, Corina; Pachankis, John E; Gamarel, Kristi E; Surace, Anthony; Golub, Sarit A; Parsons, Jeffrey T

    2015-07-01

    Given the popularity of social media among young men who have sex with men (YMSM), and in light of YMSM's elevated and increasing HIV rates, we tested the feasibility, acceptability and preliminary efficacy of a live chat intervention delivered on Facebook in reducing condomless anal sex and substance use within a group of high risk YMSM in a pre-post design with no control group. Participants (N = 41; 18-29 years old) completed up to eight one-hour motivational interviewing and cognitive behavioral skills-based online live chat intervention sessions, and reported on demographic, psychosocial, and behavioral characteristics at baseline and immediately post-intervention. Analyses indicated that participation in the intervention (n = 31) was associated with reductions of days of drug and alcohol use in the past month and instances of anal sex without a condom (including under the influence of substances), as well as increases in knowledge of HIV-related risks at 3-month follow-up. This pilot study argues for the potential of this social media-delivered intervention to reduce HIV risk among a most vulnerable group in the United States, in a manner that was highly acceptable to receive and feasible to execute. A future randomized controlled trial could generate an intervention blueprint for providers to support YMSM's wellbeing by reaching them regardless of their geographical location, at a low cost. PMID:25256808

  18. Development of a solar-powered residential air conditioner: System optimization preliminary specification

    NASA Technical Reports Server (NTRS)

    Rousseau, J.; Hwang, K. C.

    1975-01-01

    Investigations aimed at the optimization of a baseline Rankine cycle solar powered air conditioner and the development of a preliminary system specification were conducted. Efforts encompassed the following: (1) investigations of the use of recuperators/regenerators to enhance the performance of the baseline system, (2) development of an off-design computer program for system performance prediction, (3) optimization of the turbocompressor design to cover a broad range of conditions and permit operation at low heat source water temperatures, (4) generation of parametric data describing system performance (COP and capacity), (5) development and evaluation of candidate system augmentation concepts and selection of the optimum approach, (6) generation of auxiliary power requirement data, (7) development of a complete solar collector-thermal storage-air conditioner computer program, (8) evaluation of the baseline Rankine air conditioner over a five day period simulating the NASA solar house operation, and (9) evaluation of the air conditioner as a heat pump.

  19. Feasibility, Acceptability and Preliminary Efficacy of an Online Peer-to-Peer Social Support ART Adherence Intervention

    PubMed Central

    Horvath, Keith J.; Oakes, J. Michael; Rosser, B.R. Simon; Danilenko, Gene; Vezina, Heather; Amico, K. Rivet; Williams, Mark L.; Simoni, Jane

    2013-01-01

    This study describes the results of an online social support intervention, called “Thrive With Me” (TWM), to improve antiretroviral therapy (ART) adherence. HIV-positive gay or bisexually-identified men self-reporting imperfect ART adherence in the past month were randomized to receive usual care (n=57) or the eight-week TWM intervention (n=67). Self-reported ART outcome measures (0–100% in the past month) were collected at baseline, post-intervention, and 1-month follow-up. Follow-up assessment completion rate was 90%. Participants rated (1–7 scale) the intervention high in information and system quality and overall satisfaction (Means≥5.0). The intervention showed modest effects for the overall sample. However, among current drug-using participants, the TWM (v. Control) group reported significantly higher overall ART adherence (90.1% v. 57.5% at follow-up; difference=31.1, p=.02) and ART taken correctly with food (81.6% v. 55.7% at follow-up; difference=47.9, p=.01). The TWM intervention appeared feasible to implement, acceptable to users, and demonstrated greatest benefits for current drug users. PMID:23553347

  20. The Healthy for Life Taekwondo Pilot Study: A Preliminary Evaluation of Effects on Executive Function and BMI, Feasibility, and Acceptability

    PubMed Central

    Lakes, Kimberley D.; Bryars, Tracy; Sirisinahal, Swetha; Salim, Nimrah; Arastoo, Sara; Emmerson, Natasha; Kang, Daniel; Shim, Lois; Wong, Doug; Kang, Chang Jin

    2013-01-01

    There is growing consensus that exercise improves cognitive functioning, but research is needed to identify exercise interventions that optimize effects on cognition. The objective of this pilot study was to evaluate Taekwondo implemented in public middle school physical education (PE). Two classes were randomly assigned to either: five sessions per week of PE or three sessions of PE and two sessions of Taekwondo. In PE sessions, evidence-based curriculum to address the Presidential Core Fitness Guidelines and California Physical Fitness Tests was implemented. Taekwondo sessions included traditional techniques and forms taught in an environment emphasizing respect and self-control. Sixty students were evaluated at baseline and during the last week of the intervention (nine months later). Differences in mean residualized change scores for parent-rated inhibitory behavioral control yielded a significant, large effect size (d =.95, p =.00), reflecting greater improvement among Taekwondo students. Results from an executive function computer-administered task revealed greater accuracy on the congruent trial (d = 2.00, p = .02) for Taekwondo students. Differences in mean residualized change scores for BMI z scores yielded a moderate, non-significant effect size (d = − .51, p = .16). The majority of Taekwondo students reported positive perceptions of Taekwondo and perceived self-improvement in self-control and physical fitness. Results suggest that Taekwondo is an exercise program that improves cognitive functioning and is both feasible and acceptable to implement in a public school setting. PMID:24563664

  1. Psychosocial treatment for methamphetamine use disorders: a preliminary randomized controlled trial of cognitive behavior therapy and Acceptance and Commitment Therapy.

    PubMed

    Smout, Matthew F; Longo, Marie; Harrison, Sonia; Minniti, Rinaldo; Wickes, Wendy; White, Jason M

    2010-04-01

    Acceptance and Commitment Therapy (ACT) incorporates developments in behavior therapy, holds promise but has not been evaluated for methamphetamine use disorders. The objective of this study was to test whether ACT would increase treatment attendance and reduce methamphetamine use and related harms compared to cognitive behavior therapy (CBT). One hundred and four treatment-seeking adults with methamphetamine abuse or dependence were randomly assigned to receive 12 weekly 60-minute individual sessions of ACT or CBT. Attrition was 70% at 12 weeks and 86% at 24 weeks postentry. Per intention-to-treat analysis, there were no significant differences between the treatment groups in treatment attendance (median 3 sessions), and methamphetamine-related outcomes; however, methamphetamine use (toxicology-assessed and self-reported), negative consequences, and dependence severity significantly improved over time in both groups. Although ACT did not improve treatment outcomes or attendance compared to CBT, it may be a viable alternative to CBT for methamphetamine use disorders. Future rigorous research in this area seems warranted. PMID:20408061

  2. The Healthy for Life Taekwondo Pilot Study: A Preliminary Evaluation of Effects on Executive Function and BMI, Feasibility, and Acceptability.

    PubMed

    Lakes, Kimberley D; Bryars, Tracy; Sirisinahal, Swetha; Salim, Nimrah; Arastoo, Sara; Emmerson, Natasha; Kang, Daniel; Shim, Lois; Wong, Doug; Kang, Chang Jin

    2013-10-01

    There is growing consensus that exercise improves cognitive functioning, but research is needed to identify exercise interventions that optimize effects on cognition. The objective of this pilot study was to evaluate Taekwondo implemented in public middle school physical education (PE). Two classes were randomly assigned to either: five sessions per week of PE or three sessions of PE and two sessions of Taekwondo. In PE sessions, evidence-based curriculum to address the Presidential Core Fitness Guidelines and California Physical Fitness Tests was implemented. Taekwondo sessions included traditional techniques and forms taught in an environment emphasizing respect and self-control. Sixty students were evaluated at baseline and during the last week of the intervention (nine months later). Differences in mean residualized change scores for parent-rated inhibitory behavioral control yielded a significant, large effect size (d =.95, p =.00), reflecting greater improvement among Taekwondo students. Results from an executive function computer-administered task revealed greater accuracy on the congruent trial (d = 2.00, p = .02) for Taekwondo students. Differences in mean residualized change scores for BMI z scores yielded a moderate, non-significant effect size (d = - .51, p = .16). The majority of Taekwondo students reported positive perceptions of Taekwondo and perceived self-improvement in self-control and physical fitness. Results suggest that Taekwondo is an exercise program that improves cognitive functioning and is both feasible and acceptable to implement in a public school setting. PMID:24563664

  3. A water framework directive (WFD) compliant determination of eologically acceptable flows in alpine rivers - a river type specific approach

    NASA Astrophysics Data System (ADS)

    Jäger, Paul; Zitek, Andreas

    2010-05-01

    Currently the EU-Water Framework Directive (WFD) represents the driving force behind the assessment for rehabilitation and conservation of aquatic resources throughout Europe. Hydropower production, often considered as "green energy", in the past has put significant pressures on river systems like fragmentation by weirs, impoundment, hydropeaking and water abstraction. Due to the limited availability of data for determining ecologically acceptable flow for rivers at water abstraction sites, a special monitoring program was conducted in the federal state of Salzburg in Austria from 2006 to 2009. Water abstraction sites at 19 hydropower plants, mostly within the trout region of the River Salzach catchment, were assessed in detail with regard to the effect of water abstraction on fish and macrozoobenthos. Based on a detailed assessment of the specific local hydro-morphological and biological situations, the validity of natural low flow criteria (Absolute Minimum Flow - AMF, the lowest daily average flow ever measured and Mean Annual Daily Low Flow - MADLF) as starting points for the determination of an ecologically acceptable flow was tested. It was assessed, if a good ecological status in accordance with the EU-WFD can be maintained at natural AMF. Additionally it was tested, if important habitat parameters describing connectivity, river type specific flow variability and river type specific habitats are maintained at this discharge. Habitat modelling was applied in some situations. Hydraulic results showed that at AMF the highest flow velocity classes were lost in most situations. When AMF was significantly undercut, flow velocities between 0,0 - 0,4 m/s became dominant, describing the loss of the river type specific flow character, leading to a loss of river type specific flow variability and habitats and increased sedimentation of fines. Furthermore limits for parameters describing connectivity for fish like maximum depth at the pessimum profile and minimum flow

  4. 'I am not a man': Trans-specific barriers and facilitators to PrEP acceptability among transgender women.

    PubMed

    Sevelius, Jae M; Keatley, JoAnne; Calma, Nikki; Arnold, Emily

    2016-01-01

    The frequent conflation of transgender ('trans') women with 'men who have sex with men (MSM)' in HIV prevention obscures trans women's unique gender identities, social and behavioural vulnerabilities, and their disproportionately high rates of HIV infection. Pre-exposure prophylaxis (PrEP) is an efficacious biomedical HIV prevention approach. However, trans women are underrepresented in PrEP research, and are often aggregated with MSM without consideration for their unique positions within sociocultural contexts. This study examined PrEP acceptability among trans women via three focus groups and nine individual interviews (total N = 30) in San Francisco. While knowledge of PrEP was low, interest was relatively high once participants were informed. Due to past negative healthcare experiences, ability to obtain PrEP from a trans-competent provider was cited as essential to PrEP uptake and adherence. Participants noted that PrEP could address situations in which trans women experience reduced power to negotiate safer sex, including sex work. Trans-specific barriers included lack of trans-inclusive marketing of PrEP, prioritisation of hormone use, and medical mistrust due to transphobia. Findings underscore the importance of disaggregating trans women from MSM in HIV prevention strategies to mitigate disparate risk among this highly vulnerable population. PMID:26963756

  5. 3D-manufactured patient-specific models of congenital heart defects for communication in clinical practice: feasibility and acceptability

    PubMed Central

    Biglino, Giovanni; Capelli, Claudio; Wray, Jo; Schievano, Silvia; Leaver, Lindsay-Kay; Khambadkone, Sachin; Giardini, Alessandro; Derrick, Graham; Jones, Alexander; Taylor, Andrew M

    2015-01-01

    Objectives To assess the communication potential of three-dimensional (3D) patient-specific models of congenital heart defects and their acceptability in clinical practice for cardiology consultations. Design This was a questionnaire-based study in which participants were randomised into two groups: the ‘model group’ received a 3D model of the cardiac lesion(s) being discussed during their appointment, while the ‘control group’ had a routine visit. Setting Outpatient clinic, cardiology follow-up visits. Participants 103 parents of children with congenital heart disease were recruited (parental age: 43±8 years; patient age: 12±6 years). In order to have a 3D model made, patients needed to have a recent cardiac MRI examination; this was the crucial inclusion criterion. Interventions Questionnaires were administered to the participants before and after the visits and an additional questionnaire was administered to the attending cardiologist. Main outcome measures Rating (1–10) for the liking of the 3D model, its usefulness and the clarity of the explanation received were recorded, as well as rating (1–10) of the parental understanding and their engagement according to the cardiologist. Furthermore, parental knowledge was assessed by asking them to mark diagrams, tick keywords and provide free text answers. The duration of consultations was recorded and parent feedback collected. Results Parents and cardiologists both found the models to be very useful and helpful in engaging the parents in discussing congenital heart defects. Parental knowledge was not associated with their level of education (p=0.2) and did not improve following their visit. Consultations involving 3D models lasted on average 5 min longer (p=0.02). Conclusions Patient-specific models can enhance engagement with parents and improve communication between cardiologists and parents, potentially impacting on parent and patient psychological adjustment following treatment. However, in

  6. Preliminary level 2 specification for the nested, fixed-depth sampling system

    SciTech Connect

    BOGER, R.M.

    1999-05-26

    This revision 1 Level 2 Specification establishes the performance, design, development, and test requirements for a sampling system and for an at-tank analysis system that will support the BNFL, Inc. privatization contract in the final disposal of Hanford's high level waste (HLW) and low activity waste (LAW). The sampling system will quickly provide large volume, representative waste samples for validating the chemical, radiological, and physical properties of the tank waste without the exposure and time concerns of the baseline grab sampling method. The on-line sensors of the at-tank analysis system will provide data from which the mixing or settling status of the waste can be assessed. This revision 1 document includes functions, requirement, and specifications for the at-tank analysis system, the results of the preliminary outline design, and the FY 1998 validation testing. The sample container filling system will comply with RCRA criteria for samples with volatile organic constituents, include empty container and swipe input ports, use Hanford's Steel Pig radioactive sample package, comply with Hanford's flammable gas criteria, and have the means to recover from broken sample containers.

  7. Perceptions of a Specific Family Communication Application among Grandparents and Grandchildren: An Extension of the Technology Acceptance Model

    PubMed Central

    Tsai, Tsai-Hsuan; Chang, Hsien-Tsung; Ho, Yi-Lun

    2016-01-01

    Many studies have noted that the use of social networks sites (SNSs) can enhance social interaction among the elderly and that the motivation for the elderly to use SNSs is to keep in contact with remote friends and family or the younger generation. Memotree is designed to promote intergenerational family communication. The system incorporates the Family Tree design concept and provides family communication mechanisms based on the Family Communication Scale. In addition, the system optimizes hardware and interface use to conform to the specific needs of older and substantially younger individuals. Regarding the impact of variables on SNS with respect to the interaction of usability variables in the construction of a cross-generational communication platform, we adopted the TAM model and Chung et al.’s suggestions to promote user acceptance of the proposed Memotree system. A total of 39 grandchildren and 39 grandparents met the criteria and were included in the study. The elderly and young respondents revealed substantial willingness to use and/or satisfaction with using the Memotree system. Empirical results indicate that technology affordances and perceived ease of use have a positive impact on perceived usefulness, while perceived ease of use is affected by technology affordances. Internet self-efficacy and perceived usefulness have a positive impact on the user’s behavioral intention toward the system. In addition, this study investigated age as a moderating variable in the model. The results indicate that grandchildren have a larger significant effect on the path between perceived usefulness and behavioral intention than grandparents. This study proposes a more complete framework for investigating the user’s behavioral intention and provides a more appropriate explanation of related services for cross-generational interaction with SNS services. PMID:27270915

  8. Perceptions of a Specific Family Communication Application among Grandparents and Grandchildren: An Extension of the Technology Acceptance Model.

    PubMed

    Tsai, Tsai-Hsuan; Chang, Hsien-Tsung; Ho, Yi-Lun

    2016-01-01

    Many studies have noted that the use of social networks sites (SNSs) can enhance social interaction among the elderly and that the motivation for the elderly to use SNSs is to keep in contact with remote friends and family or the younger generation. Memotree is designed to promote intergenerational family communication. The system incorporates the Family Tree design concept and provides family communication mechanisms based on the Family Communication Scale. In addition, the system optimizes hardware and interface use to conform to the specific needs of older and substantially younger individuals. Regarding the impact of variables on SNS with respect to the interaction of usability variables in the construction of a cross-generational communication platform, we adopted the TAM model and Chung et al.'s suggestions to promote user acceptance of the proposed Memotree system. A total of 39 grandchildren and 39 grandparents met the criteria and were included in the study. The elderly and young respondents revealed substantial willingness to use and/or satisfaction with using the Memotree system. Empirical results indicate that technology affordances and perceived ease of use have a positive impact on perceived usefulness, while perceived ease of use is affected by technology affordances. Internet self-efficacy and perceived usefulness have a positive impact on the user's behavioral intention toward the system. In addition, this study investigated age as a moderating variable in the model. The results indicate that grandchildren have a larger significant effect on the path between perceived usefulness and behavioral intention than grandparents. This study proposes a more complete framework for investigating the user's behavioral intention and provides a more appropriate explanation of related services for cross-generational interaction with SNS services. PMID:27270915

  9. Crystallization and preliminary X-ray crystallographic analysis of yeast NAD{sup +}-specific isocitrate dehydrogenase

    SciTech Connect

    Hu, Gang; Taylor, Alexander B.; McAlister-Henn, Lee; Hart, P. John

    2005-05-01

    Yeast NAD{sup +}-isocitrate dehydrogenase has been purified and crystallized using sodium citrate, a competitive inhibitor of the enzyme, as a precipitant. Preliminary X-ray analyses indicate the molecular boundaries of the molecule and large continuous solvent channels in the crystal. NAD{sup +}-specific isocitrate dehydrogenase (IDH; EC 1.1.1.41) is a complex allosterically regulated enzyme in the tricarboxylic acid cycle. Yeast IDH is believed to be an octamer containing four catalytic IDH2 and four regulatory IDH1 subunits. Crystals of yeast IDH have been obtained and optimized using sodium citrate, a competitive inhibitor of the enzyme, as the precipitating agent. The crystals belong to space group R3, with unit-cell parameters a = 302.0, c = 112.1 Å. Diffraction data were collected to 2.9 Å from a native crystal and to 4.0 Å using multiwavelength anomalous diffraction (MAD) methods from an osmium derivative. Initial electron-density maps reveal large solvent channels and the molecular boundaries of the allosteric IDH multimer.

  10. Feasibility Study for a Remote Terminal Central Computing Facility Serving School and College Institutions. Volume II, Preliminary Specifications.

    ERIC Educational Resources Information Center

    International Business Machines Corp., White Plains, NY.

    Preliminary specifications of major equipment and programing systems characteristics for a remote terminal central computing facility serving 25-75 secondary schools are presented. Estimation techniques developed in a previous feasibility study were used to delineate workload demands for four model regions with different numbers of institutions…

  11. Functional Analysis and Preliminary Specifications for a Single Integrated Central Computer System for Secondary Schools and Junior Colleges. Interim Report.

    ERIC Educational Resources Information Center

    1968

    The present report proposes a central computing facility and presents the preliminary specifications for such a system. It is based, in part, on the results of earlier studies by two previous contractors on behalf of the U.S. Office of Education. The recommendations are based upon the present contractors considered evaluation of the earlier…

  12. The Development of Elementary School Educational Specifications and Preliminary Building Plans Through the Use of Citizen and Staff Involvement.

    ERIC Educational Resources Information Center

    Davis, Robert F.

    This dissertation recounts the functioning of a practicum established to develop educational specifications and preliminary building plans for five new elementary schools in the Sacramento City Unified School District. These buildings will be built to replace schools that do not meet earthquake safety standards. Project teams developed educational…

  13. Acceptability and preliminary efficacy of a tailored online HIV/STI testing intervention for young men who have sex with men: the Get Connected! program.

    PubMed

    Bauermeister, José A; Pingel, Emily S; Jadwin-Cakmak, Laura; Harper, Gary W; Horvath, Keith; Weiss, Gretchen; Dittus, Patricia

    2015-10-01

    Southeast Michigan accounts for over 70 % of all HIV/STI cases in the state, with young men who have sex with men (YMSM) between the ages of 13 and 24 encumbering the largest burden in HIV/STI incidence. Using community-based participatory research principles, we developed and pilot tested a web-based, randomized control trial seeking to promote HIV/STI testing ("Get Connected!") among YMSM (N = 130; ages 15-24). Randomized participants completed a baseline assessment and shown a test-locator condition (control) or a tailored, personalized site (treatment). At 30-day follow-up, we found high acceptability among YMSM in both conditions, yet higher credibility of intervention content among YMSM in the treatment group (d = .55). Furthermore, 30 participants reported testing by following, with the majority of these participants (73.3 %; n = 22) completing the treatment condition, a clinically meaningful effect (d = .34) suggesting preliminary efficacy for the intervention. These results demonstrate the potential of the intervention, and suggest that a larger efficacy trial may be warranted. PMID:25638038

  14. Preliminary evaluation of the ligase chain reaction for specific detection of Neisseria gonorrhoeae.

    PubMed Central

    Birkenmeyer, L; Armstrong, A S

    1992-01-01

    Rapid identification of Neisseria gonorrhoeae in clinical specimens is essential for effective control. Traditional culture requires a minimum of 24 h, and for some specimens harboring gonococci, the gonococci fail to grow or are misidentified. The recently described ligase chain reaction (LCR) is a highly specific and sensitive DNA amplification technique which was evaluated as an alternative to routine culture. Three LCR probe sets were used. Two of the probe sets were directed against the multi-copy Opa genes (Omp-II), while the third set was targeted against the multicopy Pilin genes. Each LCR probe set was evaluated with 260 microorganisms including 136 global isolates of N. gonorrhoeae, 41 isolates of N. meningitidis, and 10 isolates of N. lactamica; 26 nonpathogenic Neisseria strains; and 47 isolates of non-Neisseria species that may reside in clinical specimens. Amplification products were detected by using the IMx LCR format (Abbott Laboratories, Abbott Park, Ill.). Strains of N. gonorrhoeae were assayed at 270 cells per LCR (approximately 6.7 x 10(4) CFU/ml) with the Opa and Pilin probes, producing signals at least 21 and 15 times above background, respectively. In contrast, only background values were observed when testing the probe sets with 124 nongonococcal strains at 1.3 x 10(6) cells per LCR (approximately 3.2 x 10(8) CFU/ml). One hundred urogenital specimens were assayed by LCR, and compared with culture, the three probes were 100% sensitive (8 of 8) and 97.8% specific (90 of 92), resulting in an agreement of 98% (98 of 100). On the basis of the results of these preliminary studies, LCR has the potential to be an accurate and rapid DNA probe assay for the detection of N. gonorrhoeae in clinical specimens. PMID:1452689

  15. Reference field specification and preliminary beam selection strategy for accelerator-based GCR simulation.

    PubMed

    Slaba, Tony C; Blattnig, Steve R; Norbury, John W; Rusek, Adam; La Tessa, Chiara

    2016-02-01

    The galactic cosmic ray (GCR) simulator at the NASA Space Radiation Laboratory (NSRL) is intended to deliver the broad spectrum of particles and energies encountered in deep space to biological targets in a controlled laboratory setting. In this work, certain aspects of simulating the GCR environment in the laboratory are discussed. Reference field specification and beam selection strategies at NSRL are the main focus, but the analysis presented herein may be modified for other facilities and possible biological considerations. First, comparisons are made between direct simulation of the external, free space GCR field and simulation of the induced tissue field behind shielding. It is found that upper energy constraints at NSRL limit the ability to simulate the external, free space field directly (i.e. shielding placed in the beam line in front of a biological target and exposed to a free space spectrum). Second, variation in the induced tissue field associated with shielding configuration and solar activity is addressed. It is found that the observed variation is likely within the uncertainty associated with representing any GCR reference field with discrete ion beams in the laboratory, given current facility constraints. A single reference field for deep space missions is subsequently identified. Third, a preliminary approach for selecting beams at NSRL to simulate the designated reference field is presented. This approach is not a final design for the GCR simulator, but rather a single step within a broader design strategy. It is shown that the beam selection methodology is tied directly to the reference environment, allows facility constraints to be incorporated, and may be adjusted to account for additional constraints imposed by biological or animal care considerations. The major biology questions are not addressed herein but are discussed in a companion paper published in the present issue of this journal. Drawbacks of the proposed methodology are discussed

  16. Reference field specification and preliminary beam selection strategy for accelerator-based GCR simulation

    NASA Astrophysics Data System (ADS)

    Slaba, Tony C.; Blattnig, Steve R.; Norbury, John W.; Rusek, Adam; La Tessa, Chiara

    2016-02-01

    The galactic cosmic ray (GCR) simulator at the NASA Space Radiation Laboratory (NSRL) is intended to deliver the broad spectrum of particles and energies encountered in deep space to biological targets in a controlled laboratory setting. In this work, certain aspects of simulating the GCR environment in the laboratory are discussed. Reference field specification and beam selection strategies at NSRL are the main focus, but the analysis presented herein may be modified for other facilities and possible biological considerations. First, comparisons are made between direct simulation of the external, free space GCR field and simulation of the induced tissue field behind shielding. It is found that upper energy constraints at NSRL limit the ability to simulate the external, free space field directly (i.e. shielding placed in the beam line in front of a biological target and exposed to a free space spectrum). Second, variation in the induced tissue field associated with shielding configuration and solar activity is addressed. It is found that the observed variation is likely within the uncertainty associated with representing any GCR reference field with discrete ion beams in the laboratory, given current facility constraints. A single reference field for deep space missions is subsequently identified. Third, a preliminary approach for selecting beams at NSRL to simulate the designated reference field is presented. This approach is not a final design for the GCR simulator, but rather a single step within a broader design strategy. It is shown that the beam selection methodology is tied directly to the reference environment, allows facility constraints to be incorporated, and may be adjusted to account for additional constraints imposed by biological or animal care considerations. The major biology questions are not addressed herein but are discussed in a companion paper published in the present issue of this journal. Drawbacks of the proposed methodology are discussed

  17. Pilot of the Brief Behavioral Activation Treatment for Depression in Latinos with Limited English Proficiency: Preliminary Evaluation of Efficacy and Acceptability

    PubMed Central

    Collado, Anahi; Castillo, Soraida D.; Maero, Fabian; Lejuez, C. W.; MacPherson, Laura

    2014-01-01

    Latinos with limited English proficiency (LEP) experience multiple barriers to accessing efficacious mental health treatments. Using a stage model of behavioral therapies research, this Stage 1b investigation evaluated the Brief Behavioral Activation Treatment for Depression (BATD), an intervention which may be well-equipped to address existing treatment barriers. A sample of 10 Latinos with LEP and depressive symptomatology participated in a 10-session,direct (i.e., literal) Spanish-language translation of BATD, with no other cultural modifications. Participants were assessed at each session for depressive symptomatology and for the proposed BATD mechanisms: activity engagement and environmental reward. One month after treatment, participants were reassessed and interviewed to elicit feedback about BATD. Hierarchical Linear Model analyses were used to measure BATD outcomes. Results showed depressive symptomatology decreased (p<.001), while both activation (p = .04) and environmental reward (p = .02) increased over the course of BATD. Increases in activation corresponded concurrently with decreases in depression (p = .01), while environmental reward preceded decreases in depressive symptomatology (all p’s≤ .04). Follow-up analyses revealed sustained clinical gains in depression and activation, and an increase in environmental reward at follow-up. Participant interviews conducted one month after treatment conclusion indicated that BATD is an acceptable treatment for our sample of interest. Despite the limitations inherent to a study restricted to sample of ten, preliminary outcomes of this Stage I research suggest that members of this otherwise underserved group showed improvements in depressive symptomatology and are willing to participate in and adhere to BATD. The study’s positive outcomes suggest that a Stage II randomized clinical trial is a logical next step. PMID:24411118

  18. Testing the Technology Acceptance Model: HIV Case Managers' Intention to Use a Continuity of Care Record with Context-specific Links

    PubMed Central

    Bakken, Suzanne

    2014-01-01

    Objective The goal of this study was to examine the applicability of the Technology Acceptance Model (TAM) in explaining Human Immunodeficiency Virus (HIV) case managers’ acceptance of a prototype Continuity of Care Record (CCR) with context-specific links designed to meet their information needs. Design An online survey, based on the constructs of the Technology Acceptance Model (TAM), of 94 case managers who provide care to persons living with HIV (PLWH). To assess the consistency, reliability and fit of the model factors, three methods were used: principal components factor analysis, Cronbach’s alpha, and regression analysis. Results Principal components factor analysis resulted in three factors (Perceived Ease of Use, Perceived Usefulness, and Barriers to Use) that explained 84.88% of the variance. Internal consistency reliability estimates ranged from .69–.91. In a linear regression model, Perceived Ease of Use, Perceived Usefulness, and Barriers to Use scores explained 43.6% (p <.001) of the variance in Behavioral Intention to use a CCR with context-specific links. Conclusion Our study validated the use of the TAM in health information technology.Results from our study demonstrated that Perceived Ease of Use, Perceived Usefulness, and Barriers to Use are predictors of Behavioral Intention to use a CCR with context-specific links to web-based information resources. PMID:21848452

  19. Small molecule specific run acceptance, specific assay operation, and chromatographic run quality assessment: recommendation for best practices and harmonization from the global bioanalysis consortium harmonization teams.

    PubMed

    Woolf, Eric J; McDougall, Stuart; Fast, Douglas M; Andraus, Maristela; Barfield, Matthew; Blackburn, Michael; Gordon, Ben; Hoffman, David; Inoue, Noriko; Marcelin-Jimenez, Gabriel; Flynn, Amy; LeLacheur, Richard; Reuschel, Scott; Santhanam, Ravisankar; Bennett, Patrick; Duncan, Barbara; Hayes, Roger; Lausecker, Berthold; Sharma, Abhishek; Togashi, Kazutaka; Trivedi, Ravi Kumar; Vago, Miguel; White, Stephen; Barton, Hollie; Dunn, John A; Farmen, Raymond H; Heinig, Katja; Holliman, Christopher; Komaba, Junji; Riccio, Maria Francesca; Thomas, Elizabeth

    2014-09-01

    Consensus practices and regulatory guidance for liquid chromatography-mass spectrometry/mass spectrometry (LC-MS/MS) assays of small molecules are more aligned globally than for any of the other bioanalytical techniques addressed by the Global Bioanalysis Consortium. The three Global Bioanalysis Consortium Harmonization Teams provide recommendations and best practices for areas not yet addressed fully by guidances and consensus for small molecule bioanalysis. Recommendations from all three teams are combined in this report for chromatographic run quality, validation, and sample analysis run acceptance. PMID:24961918

  20. Preliminary Estimates of Specific Discharge and TransportVelocities near Borehole NC-EWDP-24PB

    SciTech Connect

    Freifeld, Barry; Doughty, Christine; Finsterle, Stefan

    2006-06-21

    This report summarizes fluid electrical conductivity (FEC)and thermal logging data collected in Borehole NC-EWDP-24PB, locatedapproximately 15 km south of the proposed repository at Yucca Mountain.Preliminary analyses of a small fraction of the FEC and temperature dataindicate that relatively large, localized fluid fluxes are likely toexist at this location. The implication that considerable flow is inducedby small gradients, and that flow is highly localized, is significant forthe estimation of groundwater transport velocities and radionuclidetravel times. The sensitivity of the data to potential perturbationsduring testing (i.e., internal wellbore flow in the case of FEC data, andbuoyancy effects in the case of thermal logging data) make it difficultto conclusively derive fluid fluxes and transport velocities without adetailed analysis of all data and processes involved. Such acomprehensive analysis has not yet been performed. However, thepreliminary results suggest that the ambient component of the estimatedflow rates is significant and on the order of liters per minute, yieldinggroundwater transport velocities in the range of kilometers per year. Oneparticular zone in the Bullfrog tuff exhibits estimated velocities on theorder of 10 km/yr. Given that the preliminary estimates of ambient flowrates and transport velocities are relatively high, and considering thepotential impact of high rates and velocities on saturated-zone flow andtransport behavior, we recommend that a comprehensive analysis of all theavailable data be performed. Moreover, additional data sets at otherlocations should be collected to examine whether the current data set isrepresentative of the regional flow system near YuccaMountain.

  1. A Preliminary Examination of Specific Risk Assessment for Sexual Offenders against Children

    ERIC Educational Resources Information Center

    Proeve, Michael

    2009-01-01

    Specific risk questions concerning sexual offending, such as risk of offending against male victims given identified female victims, have seldom been discussed in the child sexual abuse literature. Two approaches to specific risk questions are described: (a) conditional probability calculations, and (b) the development of risk assessment…

  2. Preliminary characterisation of Toxoplasma gondii isolates from Zimbabwe, with stage-specific monoclonal antibodies.

    PubMed

    Hove, T; Lind, P; Mukaratirwa, S

    2005-06-01

    Cell-culture-derived clones of eight Toxoplasma gondii isolates from Zimbabwe were characterised in IFAT with a panel of five monoclonal antibodies (mAb). Each clone had been established from a single murine brain cyst. The antibodies were bradyzoite-specific (4.3), tachyzoite-specific (4.25, 5.1 and anti-P(30)), or tachyzoite- and bradyzoite-specific (5.15). Their strong reactivity with the bradyzoite-specific mAb 4.3 and their weaker reactivity with the tachyzoite-specific 4.25, 5.1 and anti-P(30) indicated that all the isolates are probably of genetic type II. Each of the isolates reacted in the IFAT in a similar way to the Danish reference strain of T. gondii, SSI-119. PMID:15949185

  3. Expendable Second Stage Reusable Space Shuttle Booster. Volume 9; Preliminary System Specification

    NASA Technical Reports Server (NTRS)

    1971-01-01

    The specification for establishing the requirements for the system performance, design, development, and ground and flight operations of the expendable second stage on a reusable space shuttle booster system is presented. The basic specification is that the system shall be capable of placing payloads in excess of 100,000 pounds into earth orbit. In addition, the expendable second stage provides a multimission, economical, large capability system suitable for a variety of space missions in the 1980 time period.

  4. Rotor systems research aircraft predesign study. Volume 4: Preliminary draft detail specification

    NASA Technical Reports Server (NTRS)

    Miller, A. N.; Linden, A. W.

    1972-01-01

    The RSRA requirements are presented in a detail specification format. Coverage of the requirements includes the following headings: (1) aircraft characteristics, (2) general features of design and construction, (3) aerodynamics, (4) structural design criteria, (5) flight control system, (6) propulsion subsystem, and (7) secondary power and distribution subsystem.

  5. Assessment of Alternative Student Aid Delivery Systems: Preliminary Specification of the Current System with Program Antecedents.

    ERIC Educational Resources Information Center

    Advanced Technology, Inc., Reston, VA.

    Specifications of the current delivery systems of the Pell Grant program, the Guaranteed Student Loan (GSL) program, and campus-based aid programs are provided. The relationship between features of the programs and delivery systems is also examined. The campus-based programs include the Supplemental Educational Opportunity Grant (SEOG) Program,…

  6. A Preliminary Study on a Specifically Expressed Arabidopsis Promotor in Vascular Bundle

    NASA Astrophysics Data System (ADS)

    Yun-hong, Gu; Chuan-xiao, Xie; Li-fang, Wu; Zeng-liang, Yu; Guang-yong, Qin; Yu-ping, Huo

    2003-04-01

    From a population of about 3500 single plants in Arabidopsis promoter trapping bank, one plant whose GUS-gene had been specifically expressed in vascular bundle, was screened by the method of gus tissue staining. The T-DNA flanking sequence was amplified using TAIL-PCR. This band will be purified and connected to TA cloning vector. After sequencing and searching in the genebank, its function will be demonatrated through transformation.

  7. An example of a constructive specification of a queue, preliminary report, appendix B

    NASA Technical Reports Server (NTRS)

    Benzinger, Leonora

    1985-01-01

    An example is presented of the constructive specification of a queue which is done in the style of (Jones 80) using the Vienna Development Method. The basic approach is that of data type refinement. The techniques used are not restricted to those used by Jones, particularly with respect to the method for proving properties of the retrieve function for linked lists, however the notation is consistent with his.

  8. Inter-Authentication-Domain (IAD) logon protocol (preliminary specification and implementation guide)

    SciTech Connect

    Nessett, D.M.

    1984-10-10

    With the development of computer networking, it has become desirable for users to interact with hosts and distributed operating systems from terminals not directly connected to those systems. Users and the institutions for which they work require distributed interactive services to take advantage of specialized software and hardware as well as economically priced computing capacity. A classical example of this requirement occurs in the ARPANET and it is becoming more widespread as local networks are interconnected. The problem of providing distributed interactive services is complicated by the heterogeneity of the systems involved. This heterogeneity is a characteristic of both the systems themselves as well as of the protocols they support. The general problems of interconnecting such systems have been previously investigated from the perspective of providing distributed interprocess communication (CEKA74, SUNC77). The framework established by this work is used to discuss the specific problem of providing distributed interactive services.

  9. Finite element analysis of patient-specific condyle fracture plates: a preliminary study.

    PubMed

    Aquilina, Peter; Parr, William C H; Chamoli, Uphar; Wroe, Stephen

    2015-06-01

    Various patterns of internal fixation of mandibular condyle fractures have been proposed in the literature. This study investigates the stability of two patient-specific implants (PSIs) for the open reduction and internal fixation of a subcondylar fracture of the mandible. A subcondylar fracture of a mandible was simulated by a series of finite element models. These models contained approximately 1.2 million elements, were heterogeneous in bone material properties, and also modeled the muscles of mastication. Models were run assuming linear elasticity and isotropic material properties for bone. The stability and von Mises stresses of the simulated condylar fracture reduced with each of the PSIs were compared. The most stable of the plate configurations examined was PSI 1, which had comparable mechanical performance to a single 2.0 mm straight four-hole plate. PMID:26000081

  10. Preliminary analysis of aircraft fuel systems for use with broadened specification jet fuels

    NASA Technical Reports Server (NTRS)

    Pasion, A. J.; Thomas, I.

    1977-01-01

    An analytical study was conducted on the use of broadened specification hydrocarbon fuels in present day aircraft. A short range Boeing 727 mission and three long range Boeing 747 missions were used as basis of calculation for one-day-per-year extreme values of fuel loading, airport ambient and altitude ambient temperatures with various seasonal and climatic conditions. Four hypothetical fuels were selected; two high-vapor-pressure fuels with 35 kPa and 70 kPa RVP and two high-freezing-point fuels with -29 C and -18 C freezing points. In-flight fuel temperatures were predicted by Boeing's aircraft fuel tank thermal analyzer computer program. Boil-off rates were calculated for the high vapor pressure fuels and heating/insulation requirements for the high freezing point fuels were established. Possible minor and major heating system modifications were investigated with respect to heat output, performance and economic penalties for the high freezing point fuels.

  11. Inter-Authentication-Domain (IAD) logon protocol (preliminary specification and implementation guide)

    SciTech Connect

    Nessett, D.M.

    1985-11-12

    With the development of computer networking, it has become desirable for users to interact with hosts and distributed operating systems from terminals not directly connected to those systems. Users and the institutions for which they work require distributed interactive services to take advantage of specialized software and hardware as well as economically priced computing capacity. A classical example of this requirement occurs in the ARPANET and it is becoming more widespread as local networks are interconnected. The problem of providing distributed interactive services is complicated by the heterogeneity of the systems involved. This heterogeneity is a characteristic of both the systems themselves as well as of the protocols they support. The general problems of interconnecting such systems have been previously investigated from the perspective of providing distributed interprocess communication. The framework established by this work is used to discuss the specific problem of providing distributed interactive services. Heterogeneity is only one aspect of the distributed interactive services problem. The variety of situations in which distributed interactive services are required, operational requirements, security considerations, and human-factors requirements also play major roles in defining the exact nature of the problem.

  12. LINCS Authentication Domain Interface (ADI) Logon protocol. (Preliminary specification and implementation guide)

    SciTech Connect

    Nessett, D.M.; Fletcher, J.G.

    1984-10-11

    With the development of computer networking a need has arisen for users to interact with various computers and distributed operating systems from terminals remotely located from those systems. By remotely located terminals we mean those connected to networks using a different protocol family than the computer or distributed operating system being logged onto. Each terminal is said to belong to an authentication domain (NESD84). We express the above requirement as the desirability to provide inter-authentication-domain interactive services. The problems and attendant requirements of accomplishing inter-authentication-domain interactive services are discussed in (NESD84). Readers are assumed to be familiar with the concepts and protocol defined in that document. This specification defines the Authentication Domain Interface (ADI) Logon protocol for the LINCS distributed operating system that in conjunction with the Inter-Authentication-Domain Logon protocol gives users of LINCS terminals the ability to logon to hosts that do not support LINCS. Hereafter, the Inter-Authentication-Domain Logon Protocol is called the IAD Logon protocol for the sake of brevity. In addition, it gives users of terminals connected to networks that do not directly support LINCS the ability to logon and use LINCS distributed resources.

  13. Chung-Li, Taiwan dual mode (Doppler and spaced antenna) VHF radar: Preliminary specifications

    NASA Technical Reports Server (NTRS)

    Brosnahan, J. W.; Chao, J.; Rottger, J.

    1983-01-01

    A major unresolved question in the field of atmospheric research using VHF radar techniques is the relative merit of the two most widely used systems. These systems are the Doppler method and the spaced antenna method. It has been suggested that one radar of each type be operated side by side for a direct comparison of the two techniques. This duplication of effort is not cost effective. The major components of both systems are identical, and one radar could be operated in both modes by proper design of a suitable antenna system and by proper data analysis. The Chung-Li radar will be able to switch between modes on a time scale of seconds and is the first VHF radar to be able to directly compare the Doppler data with spaced antenna data. The system will have performance comparable with the present SOUSY spaced antenna system and will provide mesospheric data in addition to stratospheric and tropospheric data. The major specifications of the Chung-Li radar are given.

  14. Examining the Feasibility, Tolerability, and Preliminary Efficacy of Repetitive Task-Specific Practice for People With Unilateral Spatial Neglect

    PubMed Central

    Lang, Catherine E.; Birkenmeier, Rebecca; Holm, Margo; Rubinstein, Elaine; Van Swearingen, Jessie; Skidmore, Elizabeth R.

    2016-01-01

    OBJECTIVE. We examined the feasibility, tolerability, and preliminary efficacy of repetitive task-specific practice for people with unilateral spatial neglect (USN). METHOD. People with USN ≥6 mo poststroke participated in a single-group, repeated-measures study. Attendance, total repetitions, and satisfaction indicated feasibility and pain indicated tolerability. Paired t tests and effect sizes were used to estimate changes in upper-extremity use (Motor Activity Log), function (Action Research Arm Test), and attention (Catherine Bergego Scale). RESULTS. Twenty participants attended 99.4% of sessions and completed a high number of repetitions. Participants reported high satisfaction and low pain, and they demonstrated small, significant improvements in upper-extremity use (before Bonferroni corrections; t = –2.1, p = .04, d = .30), function (t = –3.0, p < .01, d = .20), and attention (t = –3.4, p < .01, d = –.44). CONCLUSION. Repetitive task-specific practice is feasible and tolerable for people with USN. Improvements in upper-extremity use, function, and attention may be attainable. PMID:27294994

  15. Site-specific, adult bone benefits attributed to loading during youth: A preliminary longitudinal analysis.

    PubMed

    Scerpella, Tamara A; Bernardoni, Brittney; Wang, Sijian; Rathouz, Paul J; Li, Quefeng; Dowthwaite, Jodi N

    2016-04-01

    We examined site-specific bone development in relation to childhood and adolescent artistic gymnastics exposure, comparing up to 10years of prospectively acquired longitudinal data in 44 subjects, including 31 non-gymnasts (NON) and 13 gymnasts (GYM) who participated in gymnastics from pre-menarche to ≥1.9years post-menarche. Subjects underwent annual regional and whole-body DXA scans; indices of bone geometry and strength were calculated. Anthropometrics, physical activity, and maturity were assessed annually, coincident with DXA scans. Non-linear mixed effect models centered growth in bone outcomes at menarche and adjusted for menarcheal age, height, and non-bone fat-free mass to evaluate GYM-NON differences. A POST-QUIT variable assessed the withdrawal effect of quitting gymnastics. Curves for bone area, mass (BMC), and strength indices were higher in GYM than NON at both distal radius metaphysis and diaphysis (p<0.0001). At the femoral neck, greater GYM BMC (p<0.01), narrower GYM endosteal diameter (p<0.02), and similar periosteal width (p=0.09) yielded GYM advantages in narrow neck cortical thickness and buckling ratio (both p<0.001; lower BR indicates lower fracture risk). Lumbar spine and sub-head BMC were greater in GYM than NON (p<0.036). Following gymnastics cessation, GYM slopes increased for distal radius diaphysis parameters (p≤0.01) and for narrow neck BR (p=0.02). At the distal radius metaphysis, GYM BMC and compressive strength slopes decreased, as did slopes for lumbar spine BMC, femoral neck BMC, and narrow neck cortical thickness (p<0.02). In conclusion, advantages in bone mass, geometry, and strength at multiple skeletal sites were noted across growth and into young adulthood in girls who participated in gymnastics loading to at least 1.9years post-menarche. Following gymnastics cessation, advantages at cortical bone sites improved or stabilized, while advantages at corticocancellous sites stabilized or diminished. Additional longitudinal

  16. Preliminary Evidence for Feasibility, Use, and Acceptability of Individualized Texting for Adherence Building for Antiretroviral Adherence and Substance Use Assessment among HIV-Infected Methamphetamine Users

    PubMed Central

    Moore, David J.; Montoya, Jessica L.; Blackstone, Kaitlin; Depp, Colin A.; Atkinson, J. Hampton; TMARC Group, The

    2013-01-01

    The feasibility, use, and acceptability of text messages to track methamphetamine use and promote antiretroviral treatment (ART) adherence among HIV-infected methamphetamine users was examined. From an ongoing randomized controlled trial, 30-day text response rates of participants assigned to the intervention (individualized texting for adherence building (iTAB), n = 20) were compared to those in the active comparison condition (n = 9). Both groups received daily texts assessing methamphetamine use, and the iTAB group additionally received personalized daily ART adherence reminder texts. Response rate for methamphetamine use texts was 72.9% with methamphetamine use endorsed 14.7% of the time. Text-derived methamphetamine use data was correlated with data from a structured substance use interview covering the same time period (P < 0.05). The iTAB group responded to 69.0% of adherence reminder texts; among those responses, 81.8% endorsed taking ART medication. Standardized feedback questionnaire responses indicated little difficulty with the texts, satisfaction with the study, and beliefs that future text-based interventions would be helpful. Moreover, most participants believed the intervention reduced methamphetamine use and improved adherence. Qualitative feedback regarding the intervention was positive. Future studies will refine and improve iTAB for optimal acceptability and efficacy. This trial is registered with ClinicalTrials.gov NCT01317277. PMID:24078868

  17. Refraining from intrusive thoughts is strategy dependent: a comment on Sugiura, et al. And a preliminary informal test of detached mindfulness, acceptance, and other strategies.

    PubMed

    Wells, Adrian; Roussis, Panagiotis

    2014-10-01

    The control of cognition is fundamental to psychological well being. One dimension recently explored by Sugiura, Sugiura and Tanno (2013) is the perceived ability to refrain from catastrophic thinking-a construct that could be a marker of several factors. The current paper recommends deeper consideration in terms of metacognitive theory and exemplifies this by testing the effect of a strategy that focuses on abstaining from processes (detached mindfulness) vs. transforming content (acceptance, brief exposure). Fifty-six participants (M age = 21.5 yr., range = 18-42) were randomly assigned to detached mindfulness, acceptance, exposure, or a control group before watching a stressful film that induced intrusive images. Afterwards, they engaged in their respective strategies for 5 min. and the frequency of intrusive images was rated. Detached mindfulness was the only manipulation that was associated with a statistically significant lower frequency of intrusions than the control condition. It is argued that assessment of perceived skills to refrain from thinking should be conceptualized within a metacognitive framework that distinguish process- and content-oriented strategies and address the question: When is a strategy a true refrain? PMID:25243365

  18. A Group-Based Sexual Risk Reduction Intervention for Men Who Have Sex With Men in Ho Chi Minh City, Vietnam: Feasibility, Acceptability, and Preliminary Efficacy.

    PubMed

    Mimiaga, Matthew J; Closson, Elizabeth F; Biello, Katie B; Nguyen, Huyen; Nguyen, Quan Hoang; Oldenburg, Catherine E; Lan, Hang Thi Xuan; Safren, Steven A; Mayer, Kenneth H; Colby, Donn J

    2016-08-01

    An emerging HIV epidemic can be seen among men who have sex with men (MSM) in Vietnam. There are currently no evidence-based behavioral sexual risk reduction interventions for MSM in this setting. Between October 2012 and June 2013, 100 high-risk MSM from Ho Chi Minh City were enrolled in an open pilot trial to assess feasibility and acceptability of a group-based, manualized sexual risk reduction intervention, and to preliminarily examine changes in primary and secondary outcomes. Participants completed a behavioral assessment battery and HIV testing at baseline, 3, and 6 months post-baseline. Over 80.0 % of the sample was <25 years old and 77.0 % identified as Bong kin ("hidden," masculine-appearing). Feasibility and acceptability of the program was evidenced by 87.0 % retention for the intervention sessions, 78.0 % completion of the 6 month assessment, and positive responses on evaluation forms and qualitative exit interviews. There was a decline in the number of condomless anal sex acts from baseline (6.32) to 3 month (2.06) and 6 month (2.49) follow-up (p < .0001). These data support the need for further testing of this group-based, behavioral HIV prevention intervention to reduce sexual risk behavior among MSM in Vietnam in a randomized controlled efficacy trial. PMID:26721662

  19. Preliminary Evidence for Feasibility, Use, and Acceptability of Individualized Texting for Adherence Building for Antiretroviral Adherence and Substance Use Assessment among HIV-Infected Methamphetamine Users.

    PubMed

    Moore, David J; Montoya, Jessica L; Blackstone, Kaitlin; Rooney, Alexandra; Gouaux, Ben; Georges, Shereen; Depp, Colin A; Atkinson, J Hampton; Tmarc Group, The

    2013-01-01

    The feasibility, use, and acceptability of text messages to track methamphetamine use and promote antiretroviral treatment (ART) adherence among HIV-infected methamphetamine users was examined. From an ongoing randomized controlled trial, 30-day text response rates of participants assigned to the intervention (individualized texting for adherence building (iTAB), n = 20) were compared to those in the active comparison condition (n = 9). Both groups received daily texts assessing methamphetamine use, and the iTAB group additionally received personalized daily ART adherence reminder texts. Response rate for methamphetamine use texts was 72.9% with methamphetamine use endorsed 14.7% of the time. Text-derived methamphetamine use data was correlated with data from a structured substance use interview covering the same time period (P < 0.05). The iTAB group responded to 69.0% of adherence reminder texts; among those responses, 81.8% endorsed taking ART medication. Standardized feedback questionnaire responses indicated little difficulty with the texts, satisfaction with the study, and beliefs that future text-based interventions would be helpful. Moreover, most participants believed the intervention reduced methamphetamine use and improved adherence. Qualitative feedback regarding the intervention was positive. Future studies will refine and improve iTAB for optimal acceptability and efficacy. This trial is registered with ClinicalTrials.gov NCT01317277. PMID:24078868

  20. Selection of disease-specific biomarkers by integrating inflammatory mediators with clinical informatics in AECOPD patients: a preliminary study.

    PubMed

    Chen, Hong; Song, Zhenju; Qian, Mengjia; Bai, Chunxue; Wang, Xiangdong

    2012-06-01

    Systemic inflammation is a major factor influencing the outcome and quality of patient with chronic obstructive pulmonary disease (COPD) and acute exacerbations (AECOPD). Because of the inflammatory complexity, a great challenge is still confronted to optimize the identification and validation of disease-specific biomarkers. This study aimed at developing a new protocol of specific biomarker evaluation by integrating proteomic profiles of inflammatory mediators with clinical informatics in AECOPD patients, understand better their function and signal networks. Plasma samples were collected from healthy non-smokers or patients with stable COPD (sCOPD) or AECOPD on days 1 and 3 of the admission and discharging day (day 7-10). Forty chemokines were measured using a chemokine multiplex antibody array. Clinical informatics was achieved by a Digital Evaluation Score System (DESS) for assessing severity of patients. Chemokine data was compared among different groups and its correlation with DESS scores was performed by SPSS software. Of 40 chemokines, 30 showed significant difference between sCOPD patients and healthy controls, 16 between AECOPD patients and controls and 13 between AECOPD patients and both sCOPD and controls, including BTC, IL-9, IL-18Bpa, CCL22,CCL23, CCL25, CCL28, CTACK, LIGHT, MSPa, MCP-3, MCP-4 and OPN. Of them, some had significant correlation with DESS scores. There is a disease-specific profile of inflammatory mediators in COPD and AECOPD patients which may have a potential diagnostics together with clinical informatics of patients. Our preliminary study suggested that integration of proteomics with clinical informatics can be a new way to validate and optimize disease-special biomarkers. PMID:21883889

  1. Quantitative wound healing studies using a portable, low cost, handheld near-infrared optical scanner: preliminary sensitivity and specificity analysis

    NASA Astrophysics Data System (ADS)

    Lei, Jiali; Rodriguez, Suset; Jayachandran, Maanasa; Solis, Elizabeth; Gonzalez, Stephanie; Perez-Clavijo, Francesco; Wigley, Stephen; Godavarty, Anuradha

    2016-03-01

    Lower extremity ulcers are devastating complications that are still un-recognized. To date, clinicians employ visual inspection of the wound site during its standard 4-week of healing process via monitoring of surface granulation. A novel ultra-portable near-infrared optical scanner (NIROS) has been developed at the Optical Imaging Laboratory that can perform non-contact 2D area imaging of the wound site. From preliminary studies it was observed that the nonhealing wounds had a greater absorption contrast with respect to the normal site, unlike in the healing wounds. Currently, non-contact near-infrared (NIR) imaging studies were carried out on 22 lower extremity wounds at two podiatric clinics, and the sensitivity and specificity of the scanner evaluated. A quantitative optical biometric was developed that differentiates healing from non-healing wounds, based on the threshold values obtained during ROC analysis. In addition, optical images of the wound obtained from weekly imaging studies are also assessed to determine the ability of the device to predict wound healing consistently on a periodic basis. This can potentially impact early intervention in the treatment of lower extremity ulcers when an objective and quantitative wound healing approach is developed. Lastly, the incorporation of MATLAB graphical user interface (GUI) to automate the process of image acquisition, image processing and image analysis realizes the potential of NIROS to perform non-contact and real-time imaging on lower extremity wounds.

  2. Preliminary evaluation of the air and fuel specific-impulse characteristics of several potential ram-jet fuels IV : hydrogen, a-methylnaphthalene, and carbon / Benson E. Gammon

    NASA Technical Reports Server (NTRS)

    Gammon, Benson E

    1951-01-01

    A preliminary analytical evaluation of the air and fuel specific-impulse characteristics of hydrogen, a-methylnapthalene, and graphite carbon has been made. Adiabatic constant-pressure combustion flame temperatures for each fuel at several equivalence ratios were calculated for an initial air temperature of 560 degrees R and a pressure of 2 atmospheres.

  3. Molten salt steam generator subsystem research experiment: executive summary. Phase I. Specification and preliminary design. Final report

    SciTech Connect

    1984-09-01

    This is the executive summary for a study in which steam generator subsystem and component designs were developed for central receiver solar power applications using molten nitrate salt as the primary heat transfer medium. Designs were established for a 100 MWe stand-alone plant and for a 100 MWe fossil-fueled plant which has been 50% repowered by solar energy. In the course of this program, (1) an optimum steam system arrangement was selected for both the stand-alone and repowering applications; (2) cost-effective heat exchanger designs (preheater, evaporator, superheater, and reheater) were established based on conventional fabrication processes; (3) comprehensive subsystem and component specifications were prepared; (4) a control system was designed and characterized, and the system response to selected upset transients was simulated; (5) shop fabrication and field erection plans, schedules, and cost estimates were developed; and (6) development plans intended to resolve design uncertainties and assure user confidence and acceptance were prepared. The complete Phase I final report has been published as SAND 82-8177.

  4. Preliminary experiments on dynamic biology of micro-organisms to avoid any specific full-blown syndrome on humans

    NASA Astrophysics Data System (ADS)

    Meer, Sneer

    2002-06-01

    The aim of this paper is to apply an efficient system to detect, identify and quicken suppression of any dangerous micro-organism which threatens the health of the human body in any form. It is well known that some specimens of this kind of possess a specific energy related to their speed of division, toxin emissions and high-powered interaction with human and animal cells which have the capacity to provide certain deadly full-blown syndromes. Many problems relating to the above-mentioned properties have not been clarified to date, and it is vital to find a rapid and valid reply as soon as possible. Inter-disciplinary sciences directed us to start some experiments to solve such problems, considering that the human body is dotted with a multiple interactive system of energy release, a fact which can explain the source of the micro-organism's energy also, for their necessity to manifest their deadly pathology. From practical preliminary experiments with some micro-mechanical systems using light-microscopy, connected to video TV Recorder System, one obtains optical enlarged TV images of certain processes which indicated the right way towards our crucial target; ie: the preparation of safe vaccines and safe medicines. This will constitute a basic system to a void deadly manifestations of dangerous micro-organisms and/or even regular infections on earth and in space, a system which will probably be applied at the ISS Space Station and other future actions in space in long and very long flights. We look forward to applying this system of dynamic biology towards preparation of a real and valid vaccine(s) against HIV virus on AIDS diseases.

  5. Use of prior manufacturer specifications with Bayesian logic eludes preliminary phase issues in quality control: an example in a hemostasis laboratory.

    PubMed

    Tsiamyrtzis, Panagiotis; Sobas, Frédéric; Négrier, Claude

    2015-07-01

    The present study seeks to demonstrate the feasibility of avoiding the preliminary phase, which is mandatory in all conventional approaches for internal quality control (IQC) management. Apart from savings on the resources consumed by the preliminary phase, the alternative approach described here is able to detect any analytic problems during the startup and provide a foundation for subsequent conventional assessment. A new dynamically updated predictive control chart (PCC) is used. Being Bayesian in concept, it utilizes available prior information. The manufacturer's prior quality control target value, the manufacturer's maximum acceptable interassay coefficient of variation value and the interassay standard deviation value defined during method validation in each laboratory, allow online IQC management. An Excel template, downloadable from journal website, allows easy implementation of this alternative approach in any laboratory. In the practical case of prothrombin percentage measurement, PCC gave no false alarms with respect to the 1ks rule (with same 5% false-alarm probability on a single control sample) during an overlap phase between two IQC batches. Moreover, PCCs were as effective as the 1ks rule in detecting increases in both random and systematic error after the minimal preliminary phase required by medical biology guidelines. PCCs can improve efficiency in medical biology laboratories. PMID:25978121

  6. UGV acceptance testing

    NASA Astrophysics Data System (ADS)

    Kramer, Jeffrey A.; Murphy, Robin R.

    2006-05-01

    With over 100 models of unmanned vehicles now available for military and civilian safety, security or rescue applications, it is important to for agencies to establish acceptance testing. However, there appears to be no general guidelines for what constitutes a reasonable acceptance test. This paper describes i) a preliminary method for acceptance testing by a customer of the mechanical and electrical components of an unmanned ground vehicle system, ii) how it has been applied to a man-packable micro-robot, and iii) discusses the value of testing both to ensure that the customer has a workable system and to improve design. The test method automated the operation of the robot to repeatedly exercise all aspects and combinations of components on the robot for 6 hours. The acceptance testing process uncovered many failures consistent with those shown to occur in the field, showing that testing by the user does predict failures. The process also demonstrated that the testing by the manufacturer can provide important design data that can be used to identify, diagnose, and prevent long-term problems. Also, the structured testing environment showed that sensor systems can be used to predict errors and changes in performance, as well as uncovering unmodeled behavior in subsystems.

  7. Specific acceptance of fetal bowel allograft in mice after combined treatment with anti-intercellular adhesion molecule-1 and leukocyte function-associated antigen-1 antibodies.

    PubMed Central

    Kato, Y; Yamataka, A; Yagita, H; Okumura, K; Fujiwara, T; Miyano, T

    1996-01-01

    -party alloantigen was intact (p = NS). Third-party skin graft was normally rejected within 10 days, whereas donor-type skin graft was accepted in all mice tested. CONCLUSIONS: Specific tolerance for fetal bowel allografts could be induced by a relatively short-term treatment with anti-ICAM-1 and anti-LFA-1 MoAbs. This mode of immunointervention could perhaps be applied to humans undergoing small-bowel transplantation. Images Figure 1. Figure 3. PMID:8554424

  8. Developing a Physiotherapy-Specific Preliminary Clinical Decision-Making Tool for Oxygen Titration: A Modified Delphi Study

    PubMed Central

    Duong, Michelle; Bertin, Kendra; Henry, Renee; Singh, Deepti; Timmins, Nolla; Brooks, Dina; Mathur, Sunita

    2014-01-01

    ABSTRACT Purpose: To develop and evaluate a preliminary clinical decision-making tool (CDMT) to assist physiotherapists in titrating oxygen for acutely ill adults in Ontario. Methods: A panel of 14 experienced cardiorespiratory physiotherapists was recruited. Factors relating to oxygen titration were identified using a modified Delphi technique. Four rounds of questionnaires were conducted, during which the goals were to (1) generate factors, (2) reduce factors and debate contentious factors, (3) finalize factors and develop the preliminary CDMT, and (4) evaluate the usability of the tool in a clinical context. Results: The panel reached consensus on a total of 89 factors, which were compiled to create the preliminary CDMT. The global tool reached consensus for sensibility, receiving a mean score of 6/7 on a 7-point Likert-type scale (1=unacceptable; 7=excellent). Five of the nine individual components of evaluation of the tool achieved scores ≥6.0; the remaining four had mean scores between 5.4 and 5.9. Conclusion: This study produced a preliminary CDMT for oxygen titration, which the panel agreed was highly comprehensible and globally sensible. Further research is necessary to evaluate the sensibility and applicability of the tool in a clinical setting. PMID:25125782

  9. Cone penetrometer acceptance test report

    SciTech Connect

    Boechler, G.N.

    1996-09-19

    This Acceptance Test Report (ATR) documents the results of acceptance test procedure WHC-SD-WM-ATR-151. Included in this report is a summary of the tests, the results and issues, the signature and sign- off ATP pages, and a summarized table of the specification vs. ATP section that satisfied the specification.

  10. Acceptance speech.

    PubMed

    Carpenter, M

    1994-01-01

    In Bangladesh, the assistant administrator of USAID gave an acceptance speech at an awards ceremony on the occasion of the 25th anniversary of oral rehydration solution (ORS). The ceremony celebrated the key role of the International Centre for Diarrhoeal Disease Research, Bangladesh (ICDDR,B) in the discovery of ORS. Its research activities over the last 25 years have brought ORS to every village in the world, preventing more than a million deaths each year. ORS is the most important medical advance of the 20th century. It is affordable and client-oriented, a true appropriate technology. USAID has provided more than US$ 40 million to ICDDR,B for diarrheal disease and measles research, urban and rural applied family planning and maternal and child health research, and vaccine development. ICDDR,B began as the relatively small Cholera Research Laboratory and has grown into an acclaimed international center for health, family planning, and population research. It leads the world in diarrheal disease research. ICDDR,B is the leading center for applied health research in South Asia. It trains public health specialists from around the world. The government of Bangladesh and the international donor community have actively joined in support of ICDDR,B. The government applies the results of ICDDR,B research to its programs to improve the health and well-being of Bangladeshis. ICDDR,B now also studies acute respiratory diseases and measles. Population and health comprise 1 of USAID's 4 strategic priorities, the others being economic growth, environment, and democracy, USAID promotes people's participation in these 4 areas and in the design and implementation of development projects. USAID is committed to the use and improvement of ORS and to complementary strategies that further reduce diarrhea-related deaths. Continued collaboration with a strong user perspective and integrated services will lead to sustainable development. PMID:12345470

  11. Acceptance speech.

    PubMed

    Yusuf, C K

    1994-01-01

    I am proud and honored to accept this award on behalf of the Government of Bangladesh, and the millions of Bangladeshi children saved by oral rehydration solution. The Government of Bangladesh is grateful for this recognition of its commitment to international health and population research and cost-effective health care for all. The Government of Bangladesh has already made remarkable strides forward in the health and population sector, and this was recognized in UNICEF's 1993 "State of the World's Children". The national contraceptive prevalence rate, at 40%, is higher than that of many developed countries. It is appropriate that Bangladesh, where ORS was discovered, has the largest ORS production capacity in the world. It was remarkable that after the devastating cyclone in 1991, the country was able to produce enough ORS to meet the needs and remain self-sufficient. Similarly, Bangladesh has one of the most effective, flexible and efficient control of diarrheal disease and epidemic response program in the world. Through the country, doctors have been trained in diarrheal disease management, and stores of ORS are maintained ready for any outbreak. Despite grim predictions after the 1991 cyclone and the 1993 floods, relatively few people died from diarrheal disease. This is indicative of the strength of the national program. I want to take this opportunity to acknowledge the contribution of ICDDR, B and the important role it plays in supporting the Government's efforts in the health and population sector. The partnership between the Government of Bangladesh and ICDDR, B has already borne great fruit, and I hope and believe that it will continue to do so for many years in the future. Thank you. PMID:12345479

  12. Preliminary specificity study of the Bestel-Clément-Sorine electromechanical model of the heart using parameter calibration from medical images.

    PubMed

    Marchesseau, S; Delingette, H; Sermesant, M; Sorine, M; Rhode, K; Duckett, S G; Rinaldi, C A; Razavi, R; Ayache, N

    2013-04-01

    Patient-specific cardiac modelling can help in understanding pathophysiology and predict therapy effects. This requires the personalization of the geometry, kinematics, electrophysiology and mechanics. We use the Bestel-Clément-Sorine (BCS) electromechanical model of the heart, which provides reasonable accuracy with a reduced parameter number compared to the available clinical data at the organ level. We propose a preliminary specificity study to determine the relevant global parameters able to differentiate the pathological cases from the healthy controls. To this end, a calibration algorithm on global measurements is developed. This calibration method was tested successfully on 6 volunteers and 2 heart failure cases and enabled to tune up to 7 out of the 14 necessary parameters of the BCS model, from the volume and pressure curves. This specificity study confirmed domain-knowledge that the relaxation rate is impaired in post-myocardial infarction heart failure and the myocardial stiffness is increased in dilated cardiomyopathy heart failures. PMID:23499249

  13. Life sciences payload definition and integration study, task C and D. Volume 4: Preliminary equipment item specification catalog

    NASA Technical Reports Server (NTRS)

    1973-01-01

    A specification catalog to define the equipment to be used for conducting life sciences experiments in a space laboratory is presented. The specification sheets list the purpose of the equipment item, and any specific technical requirements which can be identified. The status of similar hardware for ground use is stated with comments regarding modifications required to achieve spaceflight qualified hardware. Pertinent sketches, commercial catalog sheets, or drawings of the applicable equipment are included.

  14. Crystallization and preliminary X-ray crystallographic study on a xyloglucan-specific exo-beta-glycosidase, oligoxyloglucan reducing-end specific cellobiohydrolase.

    PubMed

    Yaoi, Katsuro; Kondo, Hidemasa; Suzuki, Mamoru; Noro, Natsuko; Tsuda, Sakae; Mitsuishi, Yasushi

    2003-10-01

    A novel xyloglucan-specific exo-beta-glycosidase, oligoxyloglucan reducing-end specific cellobiohydrolase (OXG-RCBH), recognizes the reducing end of oligoxyloglucan and releases two glucosyl residue segments from the main chain. OXG-RCBH was crystallized by the hanging-drop vapour-diffusion method with polyethylene glycol 3000 and polyethylene glycol 400 as precipitants. The crystals belong to the orthorhombic space group P2(1)2(1)2(1), with unit-cell parameters a = 61.0, b = 146.9, c = 211.9 A. The crystals diffract to a resolution of 2.2 A and are suitable for X-ray structure analysis. PMID:14501131

  15. Approaches to acceptable risk

    SciTech Connect

    Whipple, C.

    1997-04-30

    Several alternative approaches to address the question {open_quotes}How safe is safe enough?{close_quotes} are reviewed and an attempt is made to apply the reasoning behind these approaches to the issue of acceptability of radiation exposures received in space. The approaches to the issue of the acceptability of technological risk described here are primarily analytical, and are drawn from examples in the management of environmental health risks. These include risk-based approaches, in which specific quantitative risk targets determine the acceptability of an activity, and cost-benefit and decision analysis, which generally focus on the estimation and evaluation of risks, benefits and costs, in a framework that balances these factors against each other. These analytical methods tend by their quantitative nature to emphasize the magnitude of risks, costs and alternatives, and to downplay other factors, especially those that are not easily expressed in quantitative terms, that affect acceptance or rejection of risk. Such other factors include the issues of risk perceptions and how and by whom risk decisions are made.

  16. Crystallization and preliminary X-ray crystallographic analysis of a highly specific serpin from the beetle Tenebrio molitor.

    PubMed

    Park, Sun Hee; Piao, Shunfu; Kwon, Hyun Mi; Kim, Eun Hye; Lee, Bok Luel; Ha, Nam Chul

    2010-02-01

    The Toll signalling pathway, which is crucial for innate immunity, is transduced in insect haemolymph via a proteolytic cascade consisting of three serine proteases. The proteolytic cascade is downregulated by a specific serine protease inhibitor (serpin). Recently, the serpin SPN48 was found to show an unusual specific reactivity towards the terminal serine protease, Spätzle-processing enzyme, in the beetle Tenebrio molitor. In this study, the mature form of SPN48 was overexpressed in Escherichia coli and purified. The purified SPN48 protein was crystallized using 14% polyethylene glycol 8000 and 0.1 M 2-(N-morpholino)ethanesulfonic acid pH 6.0 as the precipitant. The crystals diffracted X-rays to 2.1 A resolution and were suitable for structure determination. The crystals belonged to space group P2(1). The crystal structure will provide information regarding how SPN48 achieves its unusual specificity for its target protease. PMID:20124722

  17. Targeted hyperthermia in prostate with an MR-guided endorectal ultrasound phased array: patient specific modeling and preliminary experiments

    NASA Astrophysics Data System (ADS)

    Salgaonkar, Vasant A.; Prakash, Punit; Plata, Juan; Holbrook, Andrew; Rieke, Viola; Kurhanewicz, John; Hsu, I.-C.; Diederich, Chris J.

    2013-02-01

    Feasibility of hyperthermia delivery to the prostate with a commercially available MR-guided endorectal ultrasound (ERUS) phased array ablation system (ExAblate 2100, Insightec, LTD) was assessed through computer simulations and ex vivo experiments. The simulations included a 3D FEM-based biothermal model, and acoustic field calculations for the ExAblate phased array (2.3 MHz, 2.3x4.0 cm2) using the rectangular radiator method. Array beamforming strategies were investigated to deliver 30-min hyperthermia (<41 °C) to focal regions of prostate cancer, identified from MR images in representative patient cases. Constraints on power densities, sonication durations and switching speeds imposed by ExAblate hardware and software were incorporated in the models. T<41 °C was calculated in 14-19 cm3 for sonications with planar or diverging beam patterns at 0.9-1.2 W/cm2, and in 3-10 cm3 for curvilinear (cylindrical) or multifocus beam patterns at 1.5-3.3 W/cm2, potentially useful for treating focal disease in a single posterior quadrant. Preliminary experiments included beamformed sonications in tissue mimicking phantom material under MRI-based temperature monitoring at 3T (GRE TE=7.0 ms, TR=15 ms, BW=10.5 kHz, FOV=15 cm, matrix 128x128, FA=40°). MR-temperature rises of 2-6 °C were induced in a phantom with the ExAblate array, consistent with calculated values and lower power settings (~0.86 W/cm2, 3 min.). Conformable hyperthermia may be delivered by tailoring power deposition along the array length and angular expanse. MRgERUS HIFU systems can be controlled for continuous hyperthermia in prostate to augment radiotherapy and drug delivery. [FUS Foundation, NIH R01 122276, 111981].

  18. 46 CFR 56.60-1 - Acceptable materials and specifications (replaces 123 and Table 126.1 in ASME B31.1).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...; see 46 CFR 56.01-2). (2) Materials used in piping systems must be selected from the specifications that appear in Table 56.60-1(a) of this section or 46 CFR 56.60-2, Table 56.60-2(a), or they may be... (both incorporated by reference; see 46 CFR 56.01-2) if not prohibited by a regulation of...

  19. 46 CFR 56.60-1 - Acceptable materials and specifications (replaces 123 and Table 126.1 in ASME B31.1).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...; see 46 CFR 56.01-2). (2) Materials used in piping systems must be selected from the specifications that appear in Table 56.60-1(a) of this section or 46 CFR 56.60-2, Table 56.60-2(a), or they may be... (both incorporated by reference; see 46 CFR 56.01-2) if not prohibited by a regulation of...

  20. 46 CFR 56.60-1 - Acceptable materials and specifications (replaces 123 and Table 126.1 in ASME B31.1).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...; see 46 CFR 56.01-2). (2) Materials used in piping systems must be selected from the specifications that appear in Table 56.60-1(a) of this section or 46 CFR 56.60-2, Table 56.60-2(a), or they may be... (both incorporated by reference; see 46 CFR 56.01-2) if not prohibited by a regulation of...

  1. 46 CFR 56.60-1 - Acceptable materials and specifications (replaces 123 and Table 126.1 in ASME B31.1).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...; see 46 CFR 56.01-2). (2) Materials used in piping systems must be selected from the specifications that appear in Table 56.60-1(a) of this section or 46 CFR 56.60-2, Table 56.60-2(a), or they may be... (both incorporated by reference; see 46 CFR 56.01-2) if not prohibited by a regulation of...

  2. 46 CFR 56.60-1 - Acceptable materials and specifications (replaces 123 and Table 126.1 in ASME B31.1).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...; see 46 CFR 56.01-2). (2) Materials used in piping systems must be selected from the specifications that appear in Table 56.60-1(a) of this section or 46 CFR 56.60-2, Table 56.60-2(a), or they may be... (both incorporated by reference; see 46 CFR 56.01-2) if not prohibited by a regulation of...

  3. Production of Korean Case Particles in a Korean-English Bilingual Child with Specific Language Impairment: A Preliminary Study

    ERIC Educational Resources Information Center

    Lee, Soyoung; Gorman, Brenda K.

    2009-01-01

    The purpose of this study was to investigate the use of Korean case particles in a Korean-English bilingual child with specific language impairment (SLI). The child's production of four types of Korean case particles were compared to those of three typically developing children during probe and storytelling tasks. The Korean-English bilingual…

  4. Evaluation of atmospheric density models and preliminary functional specifications for the Langley Atmospheric Information Retrieval System (LAIRS)

    NASA Technical Reports Server (NTRS)

    Lee, T.; Boland, D. F., Jr.

    1980-01-01

    This document presents the results of an extensive survey and comparative evaluation of current atmosphere and wind models for inclusion in the Langley Atmospheric Information Retrieval System (LAIRS). It includes recommended models for use in LAIRS, estimated accuracies for the recommended models, and functional specifications for the development of LAIRS.

  5. Preliminary Observations on Sensitivity and Specificity of Magnetization Transfer Asymmetry for Imaging Myelin of Rat Brain at High Field

    PubMed Central

    Kim, Jae-Woong; Choi, Jiye; Cho, Janggeun; Lee, Chulhyun; Jeon, Daejong; Park, Sung-Hong

    2015-01-01

    Magnetization transfer ratio (MTR) has been often used for imaging myelination. Despite its high sensitivity, the specificity of MTR to myelination is not high because tissues with no myelin such as muscle can also show high MTR. In this study, we propose a new magnetization transfer (MT) indicator, MT asymmetry (MTA), as a new method of myelin imaging. The experiments were performed on rat brain at 9.4 T. MTA revealed high signals in white matter and significantly low signals in gray matter and muscle, indicating that MTA has higher specificity than MTR. Demyelination and remyelination studies demonstrated that the sensitivity of MTA to myelination was as high as that of MTR. These experimental results indicate that MTA can be a good biomarker for imaging myelination. In addition, MTA images can be efficiently acquired with an interslice MTA method, which may accelerate clinical application of myelin imaging. PMID:26413534

  6. Transdiagnostic versus Diagnosis-Specific CBT for Anxiety Disorders: A Preliminary Randomized Controlled Non-inferiority Trial

    PubMed Central

    Norton, Peter J.; Barrera, Terri L.

    2012-01-01

    BACKGROUND Transdiagnostic cognitive-behavioral treatments for anxiety disorders have been gaining increased attention and empirical study in recent years. Despite this, research on transdiagnostic anxiety treatments has, to date, relied on open trials, or comparisons to waitlist conditions, published benchmarks, or relaxation-based interventions. METHODS The current study was a randomized clinical trial examining the efficacy of a 12-week transdiagnostic cognitive-behavioral group treatment in comparison to 12-week diagnosis-specific group CBT protocols for panic disorder, social anxiety disorder and generalized anxiety disorder. RESULTS Results from 46 treatment initiators suggested significant improvement during treatment, strong evidence for treatment equivalence across transdiagnostic and diagnosis-specific CBT conditions, and no differences in treatment credibility. CONCLUSIONS This study provides evidence supporting the efficacy of transdiagnostic CBT by comparison to current gold-standard diagnosis-specific CBT for social anxiety disorder, generalized anxiety disorder, and panic disorder. Transdiagnostic group CBT has the benefit of potentially easing dissemination and increasing access to evidence based treatments for anxiety without sacrificing efficacy. PMID:22767410

  7. Crystallization and Preliminary X-ray Analysis of the Human Long Myosin Light-Chain Kinase 1-Specific Domain IgCAM3

    SciTech Connect

    W Vallen Graham; A Magis; K Bailey; J Turner; D Ostrov

    2011-12-31

    Myosin light-chain kinase-dependent tight junction regulation is a critical event in inflammatory cytokine-induced increases in epithelial paracellular permeability. MLCK is expressed in human intestinal epithelium as two isoforms, long MLCK1 and long MLCK2, and MLCK1 is specifically localized to the tight junction, where it regulates paracellular permeability. The sole difference between these long MLCK splice variants is the presence of an immunoglobulin-like cell-adhesion molecule domain, IgCAM3, in MLCK1. To gain insight into the structure of the IgCAM3 domain, the IgCAM3 domain of MLCK1 has been expressed, purified and crystallized. Preliminary X-ray diffraction data were collected to 2.0 {angstrom} resolution and were consistent with the primitive trigonal space group P2{sub 1}2{sub 1}2{sub 1}.

  8. Crystal growth and preliminary X-ray study of glutamic acid specific serine protease from Bacillus intermedius

    NASA Astrophysics Data System (ADS)

    Kuranova, I. P.; Blagova, E. V.; Levdikov, V. M.; Rudenskaya, G. N.; Balaban, N. P.; Shakirov, E. V.

    1999-01-01

    The glutamic acid specific protease (glutamyl-endopeptidase) from Bacillus intermedius, strain 3-19, was isolated and purified using ion exchange chromatography on CM-cellulose and Mono-S FPLC column. The conditions for crystallization of the enzyme have been discussed. The crystals of enzyme were grown using hanging-drop vapor-diffusion technique. Crystals belong to the space group C2 with unit cell parameters of a=61.62 Å, b=55.84 Å, c=60.40 Å, β=117.6° X-ray diffraction data to 1.68 Å resolution were collected using synchrotron radiation (EMBL, Hamburg) and an imaging plate scanner.

  9. Crystallization and preliminary X-ray crystallographic analysis of the tRNA-specific adenosine deaminase from Streptococcus pyogenes

    SciTech Connect

    Ku, Min-Je; Lee, Won-Ho; Nam, Ki-hyun; Rhee, Kyeong-hee; Lee, Ki-Seog; Kim, Eunice EunKyung; Yu, Myung-Hee; Hwang, Kwang Yeon

    2005-04-01

    The tRNA-specific adenosine deaminase from the pathogenic bacteria S. pyogenes has been overexpressed and crystallized. The tRNA-specific adenosine deaminase from the pathogenic bacteria Streptococcus pyogenes (spTAD) has been overexpressed in Escherichia coli and crystallized in the presence of Zn{sup 2+} ion at 295 K using ammonium sulfate as a precipitant. Flash-cooled crystals of spTAD diffracted to 2.0 Å using 30%(v/v) glycerol as a cryoprotectant. X-ray diffraction data have been collected to 2.0 Å using synchrotron radiation. The crystal belongs to the tetragonal space group P4{sub 2}2{sub 1}2, with unit-cell parameters a = b = 81.042, c = 81.270 Å. The asymmetric unit contains one subunit of spTAD, with a corresponding crystal volume per protein weight (V{sub M}) of 3.3 Å{sup 3} Da{sup −1} and a solvent content of 62.7%.

  10. Prediction of substrate specificity and preliminary kinetic characterization of the hypothetical protein PVX_123945 from Plasmodium vivax.

    PubMed

    Srinivasan, Bharath; Kempaiah Nagappa, Lakshmeesha; Shukla, Arpit; Balaram, Hemalatha

    2015-01-01

    Members of the haloacid dehalogenase (HAD) superfamily are emerging as an important group of enzymes by virtue of their role in diverse chemical reactions. In different Plasmodium species their number varies from 16 to 21. One of the HAD superfamily members, PVX_123945, a hypothetical protein from Plasmodium vivax, was selected for examining its substrate specificity. Based on distant homology searches and structure comparisons, it was predicted to be a phosphatase. Thirty-eight metabolites were screened to identify potential substrates. Further, to validate the prediction, biochemical and kinetic studies were carried out that showed that the protein was a monomer with high catalytic efficiency for β-glycerophosphate followed by pyridoxal 5'-phosphate. The enzyme also exhibited moderate catalytic efficiencies for α-glycerophosphate, xanthosine 5'-monophosphate and adenosine 5'-monophosphate. It also hydrolyzed the artificial substrate p-nitrophenyl phosphate (pNPP). Mg(2+) was the most preferred divalent cation and phosphate inhibited the enzyme activity. The study is the first attempt at understanding the substrate specificity of a hypothetical protein belonging to HAD superfamily from the malarial parasite P. vivax. PMID:25655405

  11. Interaction of hope and optimism with anxiety and depression in a specific group of cancer survivors: a preliminary study

    PubMed Central

    2011-01-01

    Background Anxiety and depression have been identified as a common psychological distress faced by the majority of cancer patients. With the increasing number of cancer cases, increasing demands will be placed on health systems to address effective psychosocial care and therapy. The objective of this study was to assess the possible role of hope and optimism on anxiety and depression. We also wanted to investigate if there is a specific component of hope that could play a role in buffering anxiety and depression amongst cancer patients. Methods A retrospective cross sectional study was conducted in the outpatient station of the Oral and Maxillofacial Surgery at the University of Hong Kong, Hong Kong SAR, PR-China. Fifty patients successfully treated for OC cancer were recruited after their informed consents had been obtained during the review clinic. During their regular follow-up controls in the outpatient clinic the patients compiled the hospital anxiety and depression scale (HADS), hope scale (HS) and the life orientation scale-revised (LOT-R). Results Hope was negatively correlated with depression (r = -.55, p < .001) and anxiety (r = -.38, p < .05). Similar pattern was found between optimism and the latter adjustment outcomes (depression: r = -.55, p < .001; anxiety: r = -.35, p < .05). Regression analyses indentified that both hope and optimism were significant predictors of depression. Hope and optimism had equal association with depression (hope: β = .40 versus optimism: β = .38). Hope and optimism together were significantly predictive of anxiety, whereas neither hope nor optimism alone was significant individual predictors of anxiety. Conclusions Hope and optimism both negatively correlated with patients' level of anxiety and depression. Besides theoretical implications, this study brings forward relevant findings related to developing specific clinical psychological care in the field of oncology that to date has not been researched specifically in the

  12. NOTE: Development and preliminary evaluation of a prototype audiovisual biofeedback device incorporating a patient-specific guiding waveform

    NASA Astrophysics Data System (ADS)

    Venkat, Raghu B.; Sawant, Amit; Suh, Yelin; George, Rohini; Keall, Paul J.

    2008-06-01

    The aim of this research was to investigate the effectiveness of a novel audio-visual biofeedback respiratory training tool to reduce respiratory irregularity. The audiovisual biofeedback system acquires sample respiratory waveforms of a particular patient and computes a patient-specific waveform to guide the patient's subsequent breathing. Two visual feedback models with different displays and cognitive loads were investigated: a bar model and a wave model. The audio instructions were ascending/descending musical tones played at inhale and exhale respectively to assist in maintaining the breathing period. Free-breathing, bar model and wave model training was performed on ten volunteers for 5 min for three repeat sessions. A total of 90 respiratory waveforms were acquired. It was found that the bar model was superior to free breathing with overall rms displacement variations of 0.10 and 0.16 cm, respectively, and rms period variations of 0.77 and 0.33 s, respectively. The wave model was superior to the bar model and free breathing for all volunteers, with an overall rms displacement of 0.08 cm and rms periods of 0.2 s. The reduction in the displacement and period variations for the bar model compared with free breathing was statistically significant (p = 0.005 and 0.002, respectively); the wave model was significantly better than the bar model (p = 0.006 and 0.005, respectively). Audiovisual biofeedback with a patient-specific guiding waveform significantly reduces variations in breathing. The wave model approach reduces cycle-to-cycle variations in displacement by greater than 50% and variations in period by over 70% compared with free breathing. The planned application of this device is anatomic and functional imaging procedures and radiation therapy delivery.

  13. Cloning, expression, purification, crystallization and preliminary X-ray diffraction of a lysine-specific permease from Pseudomonas aeruginosa

    PubMed Central

    Nji, Emmanuel; Li, Dianfan; Doyle, Declan A.; Caffrey, Martin

    2014-01-01

    The prokaryotic lysine-specific permease (LysP) belongs to the amino acid–polyamine–organocation (APC) transporter superfamily. In the cell, members of this family are responsible for the uptake and recycling of nutrients, for the maintenance of a constant internal ion concentration and for cell volume regulation. The detailed mechanism of substrate selectivity and transport of l-lysine by LysP is not understood. A high-resolution crystal structure would enormously facilitate such an understanding. To this end, LysP from Pseudomonas aeruginosa was recombinantly expressed in Escherichia coli and purified to near homogeneity by immobilized metal ion-affinity chromatography (IMAC) and size-exclusion chromatography (SEC). Hexagonal- and rod-shaped crystals were obtained in the presence of l-lysine and the l-lysine analogue l-4-thialysine by vapour diffusion and diffracted to 7.5 Å resolution. The diffraction data were indexed in space group P21, with unit-cell parameters a = 169.53, b = 169.53, c = 290.13 Å, γ = 120°. PMID:25286940

  14. Specific identification of human papillomavirus type in cervical smears and paraffin sections by in situ hybridization with radioactive probes: a preliminary communication

    SciTech Connect

    Gupta, J.; Gendelman, H.E.; Naghashfar, Z.; Gupta, P.; Rosenshein, N.; Sawada, E.; Woodruff, J.D.; Shah, K.

    1985-01-01

    Cervical Papanicolaou smears and paraffin sections of biopsy specimens obtained from women attending dysplasia clinics were examined for viral DNA sequences by in situ hybridization technique using TVS-labeled cloned recombinant DNA probes of human papillomavirus (HPV) types 6, 11, and 16. These and one unrelated DNA probe complementary to measles virus RNA were labeled by nick translation using either one or two TVS-labeled nucleotides. Paraffin sections and cervical smears were collected on pretreated slides, hybridized with the probes under stringent or nonstringent conditions for 50 h, and autoradiographed. Additional cervical specimens from the same women were examined for the presence of genus-specific papillomavirus capsid antigen by the immunoperoxidase technique. Preliminary results may be summarized as follows. The infecting virus could be identified in smears as well as in sections. Viral DNA sequences were detected only when there were condylomatous cells in the specimen and in only a proportion of the condylomatous cells. Even under stringent conditions, some specimens reacted with both HPV-6 and HPV-11. In some instances, the cells did not hybridize with any of the three probes even when duplicate specimens contained frankly condylomatous, capsid antigen-positive cells. In situ hybridization of Papanicolaou smears or of tissue sections is a practical method for diagnosis and follow-up of specific papillomavirus infection using routinely collected material.

  15. Use of Simulation to Study Nurses' Acceptance and Nonacceptance of Clinical Decision Support Suggestions.

    PubMed

    Sousa, Vanessa E C; Lopez, Karen Dunn; Febretti, Alessandro; Stifter, Janet; Yao, Yingwei; Johnson, Andrew; Wilkie, Diana J; Keenan, Gail M

    2015-10-01

    Our long-term goal was to ensure nurse clinical decision support works as intended before full deployment in clinical practice. As part of a broader effort, this pilot project explored factors influencing acceptance/nonacceptance of eight clinical decision support suggestions displayed in an electronic health record-based nursing plan of care software prototype. A diverse sample of 21 nurses participated in this high-fidelity clinical simulation experience and completed a questionnaire to assess reasons for accepting/not accepting the clinical decision support suggestions. Of 168 total suggestions displayed during the experiment (eight for each of the 21 nurses), 123 (73.2%) were accepted, and 45 (26.8%) were not accepted. The mode number of acceptances by nurses was seven of eight, with only two of 21 nurses accepting all. The main reason for clinical decision support acceptance was the nurse's belief that the suggestions were good for the patient (100%), with other features providing secondary reinforcement. Reasons for nonacceptance were less clear, with fewer than half of the subjects indicating low confidence in the evidence. This study provides preliminary evidence that high-quality simulation and targeted questionnaires about specific clinical decision support selections offer a cost-effective means for testing before full deployment in clinical practice. PMID:26361268

  16. Crystallization and preliminary X-ray diffraction studies of frutalin, an α-D-galactose-specific lectin from Artocarpus incisa seeds.

    PubMed

    Monteiro-Moreira, Ana Cristina de Oliveira; D'Muniz Pereira, Humberto; Vieira Neto, Antonio Eufrasio; Mendes Batista Moreno, Frederico Bruno; Duarte Pinto Lobo, Marina; de Sousa, Felipe Domingos; Moreira, Renato de Azevedo

    2015-10-01

    Frutalin is an α-D-galactose-specific carbohydrate-binding glycoprotein with antitumour properties and is a powerful tool for tumour biomarker discovery. The crystallization and preliminary X-ray diffraction analysis of this lectin, which was isolated from Artocarpus incisa seeds, are reported here. Frutalin was purified and submitted to mass-spectrometric analysis. Diverse masses at approximately 16 kDa were observed in the deconvoluted spectra, which support the presence of isoforms. The best frutalin crystals were grown within a week in 0.1 M citric acid pH 3.5 which contained 25% PEG 3350 as a precipitant at 293 K, and diffracted to a maximum resolution of 1.81 Å. The monoclinic crystals belonged to space group I2, with unit-cell parameters a = 76.17, b = 74.56, c = 118.98 Å, β = 96.56°. A molecular-replacement solution was obtained which indicated the presence of four monomers per asymmetric unit. Crystallographic refinement of the structure is in progress. PMID:26457519

  17. SU-E-T-600: Patient Specific IMRT Verification Using a Phosphor-Screen Based Geometric QA System: A Preliminary Study

    SciTech Connect

    Lee, M; Hu, E; Yi, B

    2015-06-15

    Purpose: Raven QA (JPLC, MD) is a unified and comprehensive quality assurance system for QA of TG-142, which use a phosphor screen, a mirror system and a camera. It is to test if this device can be used for IMRT QA dosimetry. Methods: A lung IMRT case is used deliver dose to Raven QA. Accuracy of dose distribution of 5cm slab phantom using Eclipse planning system (Varian) has been confirmed both from a Monte Carlo Simulation and from a MapCheck (SunNuclear) measurement. Geometric distortion and variation of spatial dose response are corrected after background subtraction. A pin-hole grid plate is designed and used to determine the light scatter in the Raven QA box and the spatial dose response. Optic scatter model was not applied in this preliminary study. Dose is normalized to the response of the 10×10 field and the TMR of 5cm depth was considered. Results: Time to setup the device for IMRT QA takes less than 5 minutes as other commercially available devices. It shows excellent dose linearity and dose rate independent, less than 1 %. Background signal, however, changes for different field sizes. It is believed to be due to inaccurate correction of optic scatter. Absolute gamma (5%, 5mm) passing rate was higher than 95%. Conclusion: This study proves that the Raven QA can be used for a patient specific IMRT verification. Part of this study is supported by the Maryland Industrial Partnership Grant.

  18. Psychometric properties of the stroke specific quality of life scale for the assessment of participation in stroke survivors using the rasch model: a preliminary study

    PubMed Central

    Silva, Soraia Micaela; Corrêa, Fernanda Ishida; Faria, Christina Danielli Coelho de Morais; Corrêa, João Carlos Ferrari

    2015-01-01

    [Purpose] The aim of the present study was to analyze the psychometric properties of the Stroke Specific Quality of Life (SS-QOL) scale for the assessment of social participation following a stroke. [Methods] A preliminary analysis was performed of the SS-QOL items that address the participation category. For this, the scoring patterns of the answers of individuals and internal consistence were determined using the Rasch model. Reliability was assessed by intraclass correlation coefficients (ICC). [Results] The reliability coefficients analyzed by the Rasch model were 0.91 for the items and 0.87 for the patients. The separation index was 3.19 for the items and 2.58 for the patients. The findings indicate that the items separated the patients into three levels of participation: low, medium, and high. Among the 26 items addressing participation, three did not fit the model. All items showed adequate reliability (ICC ≥ 0.60). [Conclusion] The Rasch analysis detected three items with erratic behavior; however, the erratic patterns of these items may be explained by individual peculiarities among the patients. These items should be monitored to determine if the problems found in the present study persist. If so, the items should also be revised or possibly even eliminated. PMID:25729175

  19. Industrial cogeneration optimization program. Volume II. Appendix A. Conceptual designs and preliminary equipment specifications. Appendix B. Characterization of cogeneration systems (near-term technology). Appendix C. Optimized cogeneration systems

    SciTech Connect

    Not Available

    1980-01-01

    This appendix to a report which evaluates the technical, economic, and institutional aspects of industrial cogeneration for conserving energy in the food, chemical, textile, paper, and petroleum industries contains data, descriptions, and diagrams on conceptual designs and preliminary equipment specifications for cogeneration facilities; characterization of cogeneration systems in terms of fuel utilization, performance, air pollution control, thermal energy storage systems, and capital equipment costs; and optimized cogeneration systems for specific industrial plants. (LCL)

  20. Nitrogen trailer acceptance test report

    SciTech Connect

    Kostelnik, A.J.

    1996-02-12

    This Acceptance Test Report documents compliance with the requirements of specification WHC-S-0249. The equipment was tested according to WHC-SD-WM-ATP-108 Rev.0. The equipment being tested is a portable contained nitrogen supply. The test was conducted at Norco`s facility.

  1. Preliminary use of compound-specific stable isotope (CSSI) technique to identify and apportion sediment origin in a small Austrian catchment

    NASA Astrophysics Data System (ADS)

    Mabit, Lionel; Gibbs, Max; Chen, Xu; Meusburger, Katrin; Toloza, Arsenio; Resch, Christian; Klik, Andreas; Eder, Alexander; Strauss, Peter; Alewell, Christine

    2015-04-01

    The overall impacts of climate change on agriculture are expected to be negative, threatening global food security. In the agricultural areas of the European Union, water erosion risk is expected to increase by about 80% by the year 2050. Reducing soil erosion and sedimentation-related environmental problems represent a key requirement for mitigating the impact of climate change. A new forensic stable isotope technique, using the compound specific stable isotope (CSSI) signatures of inherent soil organic biomarkers, can discriminate and apportion the source soil contribution from different land uses. Plant communities label the soil where they grow by exuding organic biomarkers. Although all plants produce the same biomarkers, the stable isotopic signature of those biomarkers is different for each plant species. For agri-environmental investigation, the CSSI technique is based on the measurement of carbon-13 (13-C) natural abundance signatures of specific organic compounds such as natural fatty acids (FAs) in the soil. By linking fingerprints of land use to the sediment in deposition zones, this approach has been shown to be a useful technique for determining the source of eroded soil and thereby identifying areas prone to soil degradation. The authors have tested this innovative stable isotopic approach in a small Austrian agricultural catchment located 60 km north of Vienna. A previous fallout radionuclide (i.e. 137-Cs) based investigation established a sedimentation rate of 4 mm/yr in the lowest part of the study site. To gain knowledge about the origin of these sediments, the CSSI technique was then tested using representative samples from the different land-uses of the catchment as source material. Values of 13-C signatures of specific FAs (i.e. C22:0 = Behenic Acid ; C24:0 = Lignoceric Acid) and the bulk 13-C of the sediment mixture and potential landscape sources were analyzed with the mixing models IsoSource and CSSIAR v1.00. Using both mixing models

  2. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Arizona. Preliminary background report

    SciTech Connect

    Feurer, D.A.; Weaver, C.L.; Gallagher, K.C.; Hejna, D.; Rielley, K.J.

    1980-01-01

    This report is one of a series of preliminary reports describing the laws and regulatory programs of the United States and each of the 50 states affecting the siting and operation of energy generating facilities likely to be used in Integrated Community Energy Systems (ICES). Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES. This report describes laws and regulatory programs in Arizona. The Arizona state constitution establishes the Arizona Corporation Commission to regulate public service corporations. Within the area of its jurisdiction, the Commission has exclusive power and may not be interfered with by the legislature except in one narrow instance as described in the case Corporation Commission v. Pacific Greyhound Lines.

  3. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in the United States. Preliminary background report

    SciTech Connect

    Feurer, D.A.; Weaver, C.L.; Gallagher, K.C.; Hejna, D.; Rielley, K.J.

    1980-01-01

    This report is a summary of a series of preliminary reports describing the laws and regulatory programs of the United states and each of the 50 states affecting the siting and operation of energy generating facilities likely to be used in Integrated Community Energy Systems (ICES). A brief summary of public utility regulatory programs, energy facility siting programs, and municipal franchising authority is presented in this report to identify how such programs and authority may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES. Subsequent reports will (1) describe public utility rate regulatory procedures and practices as they might affect an ICES, (2) analyze each of the aforementioned regulatory programs to identify impediments to the development of ICES, and (3) recommend potential changes in legislation and regulatory practices and procedures to overcome such impediments.

  4. Preliminary Safety Analysis of the Gorleben Site: Safety Concept and Application to Scenario Development Based on a Site-Specific Features, Events and Processes (FEP) Database - 13304

    SciTech Connect

    Moenig, Joerg; Beuth, Thomas; Wolf, Jens; Lommerzheim, Andre; Mrugalla, Sabine

    2013-07-01

    Based upon the German safety criteria, released in 2010 by the Federal Ministry of the Environment (BMU), a safety concept and a safety assessment concept for the disposal of heat-generating high-level waste have both been developed in the framework of the preliminary safety case for the Gorleben site (Project VSG). The main objective of the disposal is to contain the radioactive waste inside a defined rock zone, which is called containment-providing rock zone. The radionuclides shall remain essentially at the emplacement site, and at the most, a small defined quantity of material shall be able to leave this rock zone. This shall be accomplished by the geological barrier and a technical barrier system, which is required to seal the inevitable penetration of the geological barrier by the construction of the mine. The safe containment has to be demonstrated for probable and less probable evolutions of the site, while evolutions with very low probability (less than 1 % over the demonstration period of 1 million years) need not to be considered. Owing to the uncertainty in predicting the real evolution of the site, plausible scenarios have been derived in a systematic manner. Therefore, a comprehensive site-specific features, events and processes (FEP) data base for the Gorleben site has been developed. The safety concept was directly taken into account, e.g. by identification of FEP with direct influence on the barriers that provide the containment. No effort was spared to identify the interactions of the FEP, their probabilities of occurrence, and their characteristics (values). The information stored in the data base provided the basis for the development of scenarios. The scenario development methodology is based on FEP related to an impairment of the functionality of a subset of barriers, called initial barriers. By taking these FEP into account in their probable characteristics the reference scenario is derived. Thus, the reference scenario describes a

  5. ATLAS ACCEPTANCE TEST

    SciTech Connect

    J.C. COCHRANE; J.V. PARKER; ET AL

    2001-06-01

    The acceptance test program for Atlas, a 23 MJ pulsed power facility for use in the Los Alamos High Energy Density Hydrodynamics program, has been completed. Completion of this program officially releases Atlas from the construction phase and readies it for experiments. Details of the acceptance test program results and of machine capabilities for experiments will be presented.

  6. Acceptance, values, and probability.

    PubMed

    Steel, Daniel

    2015-10-01

    This essay makes a case for regarding personal probabilities used in Bayesian analyses of confirmation as objects of acceptance and rejection. That in turn entails that personal probabilities are subject to the argument from inductive risk, which aims to show non-epistemic values can legitimately influence scientific decisions about which hypotheses to accept. In a Bayesian context, the argument from inductive risk suggests that value judgments can influence decisions about which probability models to accept for likelihoods and priors. As a consequence, if the argument from inductive risk is sound, then non-epistemic values can affect not only the level of evidence deemed necessary to accept a hypothesis but also degrees of confirmation themselves. PMID:26386533

  7. Newbery Medal Acceptance.

    ERIC Educational Resources Information Center

    Freedman, Russell

    1988-01-01

    Presents the Newbery Medal acceptance speech of Russell Freedman, writer of children's nonfiction. Discusses the place of nonfiction in the world of children's literature, the evolution of children's biographies, and the author's work on "Lincoln." (ARH)

  8. Newbery Medal Acceptance.

    ERIC Educational Resources Information Center

    Cleary, Beverly

    1984-01-01

    Reprints the text of Ms. Cleary's Newbery medal acceptance speech in which she gives personal history concerning her development as a writer and her response to the letters she receives from children. (CRH)

  9. Caldecott Medal Acceptance.

    ERIC Educational Resources Information Center

    Provensen, Alice; Provensen, Martin

    1984-01-01

    Reprints the text of the Provensens' Caldecott medal acceptance speech in which they describe their early interest in libraries and literature, the collaborative aspect of their work, and their current interest in aviation. (CRH)

  10. 32 CFR 1901.11 - Preliminary information.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Preliminary information. 1901.11 Section 1901.11... UNDER THE PRIVACY ACT OF 1974 Filing of Privacy Act Requests § 1901.11 Preliminary information. Members... outstanding fees for information services at this or other federal agencies will not be accepted and action...

  11. 32 CFR 1801.11 - Preliminary information.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 6 2011-07-01 2011-07-01 false Preliminary information. 1801.11 Section 1801.11... RIGHTS UNDER THE PRIVACY ACT OF 1974 Filing Of Privacy Act Requests § 1801.11 Preliminary information... outstanding fees for information services at this or other federal agencies will not be accepted and action...

  12. 32 CFR 1801.11 - Preliminary information.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Preliminary information. 1801.11 Section 1801.11... RIGHTS UNDER THE PRIVACY ACT OF 1974 Filing Of Privacy Act Requests § 1801.11 Preliminary information... outstanding fees for information services at this or other federal agencies will not be accepted and action...

  13. 32 CFR 1801.11 - Preliminary information.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 6 2013-07-01 2013-07-01 false Preliminary information. 1801.11 Section 1801.11... RIGHTS UNDER THE PRIVACY ACT OF 1974 Filing Of Privacy Act Requests § 1801.11 Preliminary information... outstanding fees for information services at this or other federal agencies will not be accepted and action...

  14. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Indiana. Preliminary background report

    SciTech Connect

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate public utilities is vested generally in the Public Service Commission of Indiana. The Commission is comprised of three members appointed by the governor. Commissioners are appointed for four-year terms. They must be free from any employment or pecuniary interest in any public utility. Indiana courts have stated that the Commission was created and vested with regulatory authority over public utilities in order to relieve these utilities from local regulation. Local governments do, however, have specific statutory authority to determine, by contract or ordinance, the quality and character of service to be provided by public utilities within the municipality. Local governments may also regulate the use of streets and other public property by public utilities. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  15. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Georgia. Preliminary background report

    SciTech Connect

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate public utilities is vested generally in the Public Service Commission. The Commission is composed of five members elected to six-year terms by the general electorate. Commissioners must be free of employment or pecuniary interests which are incompatible with the duties of the Commission. The Commission is the only agency that may exert regulatory control over public utilities. The legislature has delegated no regulatory authority to local government. Except for the powers incident to granting a franchise and its normal police powers, municipal corporations do not have any role in the supervision of public utilities. The Commission's general supervisory authority does not extend to public utilities owned or operated by municipal corporations. The jurisdiction of the Commission extends to several specific public utilities, including gas or electric light and power companies. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  16. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in California. Preliminary background report

    SciTech Connect

    Feurer, D.A.; Weaver, C.L.; Gallagher, K.C.; Hejna, D.; Rielley, K.J.

    1980-01-01

    The Constitution of the State of California grants to the Legislature control over persons and private corporations that own or operate a line, plant, or system for the production, generation, or transmission of heat, light, water, or power to be furnished either directly or indirectly to or for the public. The Constitution establishes the Public Utilities Commission and grants certain specific powers to the PUC, including the power to fix rates, establish rules and prescribe a uniform system of accounts. The Constitution also recognizes that the Legislature has plenary power to confer additional authority and jurisdiction upon the PUC. The Constitution prohibits regulation by a city, county, or other municipal body of matters over which the Legislature has granted regulatory power to the PUC. This provision does not, however, impair the right of any city to grant franchises for public utilities. The California legislature has enacted the California Public Utilities Code and has designated the PUC as the agency to implement the regulatory provisions of the Code. The Public Utilities Commission consists of five members appointed by the governor and approved by the senate, a majority of the membership concurring, for staggered 6-year terms. Certain limited powers over the conduct of public utilities may still be exercised by municipalities. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  17. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Arkansas. Preliminary background report

    SciTech Connect

    Feurer, D.A.; Weaver, C.L.; Gallagher, K.C.; Hejna, D.; Rielley, K.J.

    1980-01-01

    The Arkansas state constitution contains no provision dealing with public utility regulation. Title 73 of the Arkansas Statutes specifically provides for the regulation of public utilities. The Arkansas Public Service Commission is established by statute as a subagency of the Department of Commerce and is responsible for regulating electric, steam heating, and certain other kinds of utilities. The Commission consists of three members, each appointed by the governor with the approval of the Senate for a term of six years. The Commission has authority over all matters pertaining to the regulation and operation of gas companies, electric companies, and hydro-electric companies among other utilities enumerated in the statute. The role of local governments in the regulation of public utilities has been reduced by recent legislation. Municipal councils formerly had the power to regulate rate-making for investor owned utilities operating within their boundaries. However, as a result of 1977 amendments to the Public Utilities Act, ratemaking for privately owned electric, gas, telephone, and sewer utilities is now within the exclusive jurisdiction of the Public Service Commission. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  18. Accept or divert?

    PubMed

    Angelucci, P A

    1999-09-01

    Stretching scarce resources is more than a managerial issue. Should you accept the patient to an understaffed ICU or divert him to another facility? The intense "medical utility" controversy focuses on a situation that critical care nurses now face every day. PMID:10614370

  19. 1984 Newbery Acceptance Speech.

    ERIC Educational Resources Information Center

    Cleary, Beverly

    1984-01-01

    This acceptance speech for an award honoring "Dear Mr. Henshaw," a book about feelings of a lonely child of divorce intended for eight-, nine-, and ten-year-olds, highlights children's letters to author. Changes in society that affect children, the inception of "Dear Mr. Henshaw," and children's reactions to books are highlighted. (EJS)

  20. Why was Relativity Accepted?

    NASA Astrophysics Data System (ADS)

    Brush, S. G.

    Historians of science have published many studies of the reception of Einstein's special and general theories of relativity. Based on a review of these studies, and my own research on the role of the light-bending prediction in the reception of general relativity, I discuss the role of three kinds of reasons for accepting relativity (1) empirical predictions and explanations; (2) social-psychological factors; and (3) aesthetic-mathematical factors. According to the historical studies, acceptance was a three-stage process. First, a few leading scientists adopted the special theory for aesthetic-mathematical reasons. In the second stage, their enthusiastic advocacy persuaded other scientists to work on the theory and apply it to problems currently of interest in atomic physics. The special theory was accepted by many German physicists by 1910 and had begun to attract some interest in other countries. In the third stage, the confirmation of Einstein's light-bending prediction attracted much public attention and forced all physicists to take the general theory of relativity seriously. In addition to light-bending, the explanation of the advance of Mercury's perihelion was considered strong evidence by theoretical physicists. The American astronomers who conducted successful tests of general relativity became defenders of the theory. There is little evidence that relativity was `socially constructed' but its initial acceptance was facilitated by the prestige and resources of its advocates.

  1. 46 CFR 164.023-11 - Acceptance tests.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Acceptance tests. 164.023-11 Section 164.023-11 Shipping...: SPECIFICATIONS AND APPROVAL MATERIALS Thread for Personal Flotation Devices § 164.023-11 Acceptance tests. (a... submitted for acceptance. (b) Identification testing. Manufacturers shall ensure that the...

  2. 46 CFR 164.023-11 - Acceptance tests.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 6 2011-10-01 2011-10-01 false Acceptance tests. 164.023-11 Section 164.023-11 Shipping...: SPECIFICATIONS AND APPROVAL MATERIALS Thread for Personal Flotation Devices § 164.023-11 Acceptance tests. (a... submitted for acceptance. (b) Identification testing. Manufacturers shall ensure that the...

  3. The Effect of Harmonic Technique vs End Range Loading Exercises on Pain and Disability in Patients With Non-Specific Chronic Low Back Pain: A Preliminary Study

    PubMed Central

    Arab, Amir Massoud; Saadati, Heidar; Sheikhhoseini, Rahman

    2016-01-01

    Objective The purpose of this study was to compare the effects of end range loading (ERL) vs harmonic technique (HT) on patients with chronic low back pain (LBP). Method Fourteen volunteer patients with LBP were randomly assigned to 2 groups based on a blocked randomization method with 7 patients in the HT group and 7 patients in the ERL group. The patients received 10 sessions of treatment for 5 sessions per week. Pain intensity and disability score were recorded using the numeric pain scale and Roland-Morris Disability questionnaire (RMQ), respectively, before and after the treatment period. Results Although pain intensity (P = .02) and the RMQ score (P = .03) decreased in the HT technique group, no statistically significant change was found in the ERL group for the RMQ score (P > .05). The effect size for HT was .6 and .3 for numeric pain scale and RMQ, respectively. Conclusion This preliminary study showed that pain intensity and disability improved in subjects with chronic LBP in the HT group. More investigations with larger sample size are needed to clarify these findings. PMID:27069426

  4. Acceptability of human risk.

    PubMed Central

    Kasperson, R E

    1983-01-01

    This paper has three objectives: to explore the nature of the problem implicit in the term "risk acceptability," to examine the possible contributions of scientific information to risk standard-setting, and to argue that societal response is best guided by considerations of process rather than formal methods of analysis. Most technological risks are not accepted but are imposed. There is also little reason to expect consensus among individuals on their tolerance of risk. Moreover, debates about risk levels are often at base debates over the adequacy of the institutions which manage the risks. Scientific information can contribute three broad types of analyses to risk-setting deliberations: contextual analysis, equity assessment, and public preference analysis. More effective risk-setting decisions will involve attention to the process used, particularly in regard to the requirements of procedural justice and democratic responsibility. PMID:6418541

  5. Hanford Site Solid Waste Acceptance Criteria

    SciTech Connect

    MCDOWELL, A.K.; TRINER, G.C.

    2002-03-28

    DOE Order 435.1 requires that each treatment, storage, and/or disposal facility (referred to in this document as TSD unit) that manages low-level or transuranic (TRU) waste (including mixed waste and TSCA PCB waste) maintain waste acceptance criteria. These criteria must address the various requirements to operate the TSD unit in compliance with applicable safety and environmental requirements. This document sets forth the baseline criteria for acceptance of waste at TSD units operated by WMP. The criteria for each TSD unit have been established to ensure that waste accepted can be managed in a manner that is within the operating requirements of the unit, including environmental regulations, DOE Orders, permits, technical safety requirements, waste analysis plans, performance assessments, and other applicable requirements. Revisions to the acceptance criteria document require an Unreviewed Safety Question review to document that the changes are consistent with current applicable safety analysis. Acceptance criteria apply to the following TSD units: the Low-Level Burial Grounds (LLBG) including both the nonregulated portions of the LLBG and trenches 31 and 34 of the 218-W-5 Burial Ground for mixed waste disposal; Central Waste Complex (CWC); Waste Receiving and Processing (WRAP) Facility; and T-Plant facility. Waste from all generators, both from the Hanford Site and from offsite facilities, must comply with these criteria. Exceptions can be granted as provided in Section 1.6. Specific waste streams could have additional requirements based on the identified TSD pathway. These requirements are communicated in the waste specification records (WSRds) and/or waste stream profile sheet approvals. The Hanford Site manages nonradioactive waste through direct shipments to offsite contractors. The waste acceptance requirements of the offsite TSD facility must be met for these nonradioactive wastes. This document does not address the acceptance requirements of these offsite

  6. Age and Acceptance of Euthanasia.

    ERIC Educational Resources Information Center

    Ward, Russell A.

    1980-01-01

    Study explores relationship between age (and sex and race) and acceptance of euthanasia. Women and non-Whites were less accepting because of religiosity. Among older people less acceptance was attributable to their lesser education and greater religiosity. Results suggest that quality of life in old age affects acceptability of euthanasia. (Author)

  7. Age- and gender-specific effects on VDR gene polymorphisms and risk of the development of multiple sclerosis in Tunisians: a preliminary study.

    PubMed

    Ben-Selma, W; Ben-Fredj, N; Chebel, S; Frih-Ayed, M; Aouni, M; Boukadida, J

    2015-06-01

    The vitamin D receptor (VDR) polymorphisms have been reported to be associated with multiple sclerosis (MS); however, evidence remains conflicting. In this report, we investigated the association between two single nucleotide polymorphisms (SNPs) TaqI and ApaI of VDR gene and risk development of MS. TaqI and ApaI SNPs were detected by PCR-RFLP from the DNA of 60 Tunisian patients with MS and 114 healthy controls. Our results show a significant difference of the allelic frequency distribution between the case and control groups for TaqI SNP (P = 0.01), but genotype frequencies were not significantly different (P = 0.07 and 0.23). When adjusting frequency distribution of different alleles and genotypes by age, we found that the difference between the T allele frequencies of this SNP in the group of patients age [15-24] in comparison with the control group of the same age group was statistically significant (P = 0.026). Moreover, frequency of the T allele was significantly higher in male patients compared with controls of the same sex (P = 0.017). However, neither the genotype nor the allele frequency distribution was significantly different between the MS and control populations for the ApaI SNP. Our preliminary results indicate that VDR gene polymorphism could be associated with susceptibility to MS. The role of VDR gene polymorphism should be further studied in other large populations, and the distribution of other polymorphism, such as FokI and BsmI, should be also analysed to confirm another susceptibility polymorphisms gene for MS and to obtain more adequate strategies for treatment of MS. PMID:25892553

  8. Payload test philosophy. [JPL views on qualification/acceptance testing

    NASA Technical Reports Server (NTRS)

    Gindorf, T.

    1979-01-01

    The general philosophy of how JPL views payload qualification/acceptance testing for programs that are done either in-house or by contractors is described. Particular attention is given to mission risk classifications, preliminary critical design reviews, environmental design requirements, the thermal and dynamics development tests, and the flight spacecraft system test.

  9. Life sciences payload definition and integration study. Volume 3: Preliminary equipment item specification catalog for the carry-on laboratories. [for Spacelab

    NASA Technical Reports Server (NTRS)

    1974-01-01

    All general purpose equipment items contained in the final carry-on laboratory (COL) design concepts are described in terms of specific requirements identified for COL use, hardware status, and technical parameters such as weight, volume, power, range, and precision. Estimated costs for each item are given, along with projected development times.

  10. Speech Perception and Phonological Short-Term Memory Capacity in Language Impairment: Preliminary Evidence from Adolescents with Specific Language Impairment (SLI) and Autism Spectrum Disorders (ASD)

    ERIC Educational Resources Information Center

    Loucas, Tom; Riches, Nick Greatorex; Charman, Tony; Pickles, Andrew; Simonoff, Emily; Chandler, Susie; Baird, Gillian

    2010-01-01

    Background: The cognitive bases of language impairment in specific language impairment (SLI) and autism spectrum disorders (ASD) were investigated in a novel non-word comparison task which manipulated phonological short-term memory (PSTM) and speech perception, both implicated in poor non-word repetition. Aims: This study aimed to investigate the…

  11. Baby-Crying Acceptance

    NASA Astrophysics Data System (ADS)

    Martins, Tiago; de Magalhães, Sérgio Tenreiro

    The baby's crying is his most important mean of communication. The crying monitoring performed by devices that have been developed doesn't ensure the complete safety of the child. It is necessary to join, to these technological resources, means of communicating the results to the responsible, which would involve the digital processing of information available from crying. The survey carried out, enabled to understand the level of adoption, in the continental territory of Portugal, of a technology that will be able to do such a digital processing. It was used the TAM as the theoretical referential. The statistical analysis showed that there is a good probability of acceptance of such a system.

  12. High acceptance recoil polarimeter

    SciTech Connect

    The HARP Collaboration

    1992-12-05

    In order to detect neutrons and protons in the 50 to 600 MeV energy range and measure their polarization, an efficient, low-noise, self-calibrating device is being designed. This detector, known as the High Acceptance Recoil Polarimeter (HARP), is based on the recoil principle of proton detection from np[r arrow]n[prime]p[prime] or pp[r arrow]p[prime]p[prime] scattering (detected particles are underlined) which intrinsically yields polarization information on the incoming particle. HARP will be commissioned to carry out experiments in 1994.

  13. Preparation, crystallization, and preliminary X-ray diffraction study of mutant carboxypeptidase T containing the primary specificity pocket of carboxypeptidase B

    NASA Astrophysics Data System (ADS)

    Akparov, V. Kh.; Grishin, A. M.; Timofeev, V. I.; Kuranova, I. P.

    2010-09-01

    Recombinant G215S, A251G, T257A, D260G, T262D mutant carboxypeptidase T from Thermoactinomyces vulgaris containing mutations in the primary specificity pocket was prepared and crystallized. Single crystals with a size of up to 0.3 mm were grown and investigated by X-ray diffraction. Recombinant mutant carboxypeptidase T containing the primary specificity subsite compositionally identical to that of pancreatic carboxypeptidase B crystallizes in the same space group as the natural enzyme. The crystals belong to sp. gr. P6322; the unit-cell parameters are a = b = 157.867 Å, c = 104.304 Å, α = β = 90°, γ = 120°. X-ray diffraction data suitable for determining the three-dimensional structure at atomic resolution were collected from one crystal.

  14. Preparation, crystallization, and preliminary X-ray diffraction study of mutant carboxypeptidase T containing the primary specificity pocket of carboxypeptidase B

    SciTech Connect

    Akparov, V. Kh. Grishin, A. M.; Timofeev, V. I. Kuranova, I. P.

    2010-09-15

    Recombinant G215S, A251G, T257A, D260G, T262D mutant carboxypeptidase T from Thermoactinomyces vulgaris containing mutations in the primary specificity pocket was prepared and crystallized. Single crystals with a size of up to 0.3 mm were grown and investigated by X-ray diffraction. Recombinant mutant carboxypeptidase T containing the primary specificity subsite compositionally identical to that of pancreatic carboxypeptidase B crystallizes in the same space group as the natural enzyme. The crystals belong to sp. gr. P6{sub 3}22; the unit-cell parameters are a = b = 157.867 A, c = 104.304 A, {alpha} = {beta} = 90 deg., {gamma} = 120 deg. X-ray diffraction data suitable for determining the three-dimensional structure at atomic resolution were collected from one crystal.

  15. Development and Preliminary Evaluation of a Rapid Oligochromatographic Assay for Specific Detection of New Human Influenza A H1N1 Virus ▿

    PubMed Central

    Pérez-Ruiz, Mercedes; Navarro-Marí, José-María; Bautista-Marín, María-Fé; Pedrosa-Corral, Irene; Sanbonmatsu-Gámez, Sara; Camacho, Ana G.; Rojas, José; Ruiz-Ortiz, Jorge; Rodríguez-Granger, Javier; Carrillo, José Antonio

    2010-01-01

    A new oligochromatographic assay, Speed-Oligo Novel Influenza A H1N1, was designed and optimized for the specific detection of the 2009 influenza A H1N1 virus. The assay is based on a PCR method coupled to detection of PCR products by means of a dipstick device. The target sequence is a 103-bp fragment within the hemagglutinin gene. The analytical sensitivity of the new assay was measured with serial dilutions of a plasmid that contained the target sequence, and we determined that down to one copy per reaction of the plasmid was reliably detected. Diagnostic performance was assessed with 103 RNAs from suspected cases (40 positive and 63 negative results) previously analyzed with a reference real-time PCR technique. All positive cases were confirmed, and no false-positive results were detected with the new assay. No cross-reactions were observed when other viral strains or clinical samples with other respiratory viruses were tested. According to these results, this new assay has 100% sensitivity and specificity. The turnaround time for the whole procedure was 140 min. The assay may be especially useful for the specific detection of 2009 H1N1 virus in laboratories not equipped with real-time PCR instruments. PMID:20220170

  16. Technology Acceptance of Electronic Medical Records by Nurses

    ERIC Educational Resources Information Center

    Stocker, Gary

    2010-01-01

    The purpose of this study was to evaluate the Technology Acceptance Model's (TAM) relevance of the intention of nurses to use electronic medical records in acute health care settings. The basic technology acceptance research of Davis (1989) was applied to the specific technology tool of electronic medical records (EMR) in a specific setting…

  17. Preliminary systems design study assessment report. [Evaluation of using specific technologies and system concepts for testing the buried waste and the surrounding contaminated soil

    SciTech Connect

    Mayberry, J.L. ); Feizollahi, F. ); Del Signore, J.C. )

    1991-09-01

    The System Design Study (SDS), part of the Waste Technology Development Department at the Idaho National Engineering Laboratory (INEL), examined techniques available for the remediation of hazardous and transuranic waste stored at the Radioactive Waste Management Complex's Subsurface Disposal Area at the INEL. Using specific technologies, system concepts for treating the buried waste and the surrounding contaminated soil were evaluated. Evaluation included implementability, effectiveness, and cost. The SDS resulted in the development of technology requirements including demonstration, testing, and evaluation activities needed for implementing each concept.

  18. Preliminary Systems Design Study assessment report. [Evaluation of using specific technologies, system concepts for treating the buried waste and the surrounding contaminated soil

    SciTech Connect

    Mayberry, J.L.; Feizollahi, F.; Del Signore, J.C.

    1991-11-01

    The System Design Study (SDS), part of the Waste Technology Development Department at the Idaho National Engineering Laboratory (INEL), examined techniques available for the remediation of hazardous and transuranic waste stored at the Radioactive Waste Management Complex's Subsurface Disposal Area at the INEL. Using specific technologies, system concepts for treating the buried waste and the surrounding contaminated soil were evaluated. Evaluation included implementability, effectiveness, and cost. The SDS resulted in the development of technology requirements including demonstration, testing, and evaluation activities needed for implementing each concept.

  19. Expression, purification, crystallization and preliminary X-ray analysis of NAD(P)H-dependent carbonyl reductase specifically expressed in thyroidectomized chicken fatty liver.

    PubMed

    Yoneda, Kazunari; Fukuda, Yudai; Shibata, Takeshi; Araki, Tomohiro; Nikki, Takahiro; Sakuraba, Haruhiko; Ohshima, Toshihisa

    2012-12-01

    An NAD(P)H-dependent carbonyl reductase specifically expressed in thyroidectomized chicken fatty liver was crystallized using the sitting-drop vapour-diffusion method with polyethylene glycol 300 as the precipitant. The crystals belonged to the monoclinic space group C2, with unit-cell parameters a=104.26, b=81.32, c=77.27 Å, β=119.43°, and diffracted to 1.86 Å resolution on beamline NE3A at the Photon Factory. The overall Rmerge was 5.4% and the data completeness was 99.4%. PMID:23192050

  20. Person-Specific Non-shared Environmental Influences in Intra-individual Variability: A Preliminary Case of Daily School Feelings in Monozygotic Twins.

    PubMed

    Zheng, Yao; Molenaar, Peter C M; Arden, Rosalind; Asbury, Kathryn; Almeida, David M

    2016-09-01

    Most behavioural genetic studies focus on genetic and environmental influences on inter-individual phenotypic differences at the population level. The growing collection of intensive longitudinal data in social and behavioural science offers a unique opportunity to examine genetic and environmental influences on intra-individual phenotypic variability at the individual level. The current study introduces a novel idiographic approach and one novel method to investigate genetic and environmental influences on intra-individual variability by a simple empirical demonstration. Person-specific non-shared environmental influences on intra-individual variability of daily school feelings were estimated using time series data from twenty-one pairs of monozygotic twins (age = 10 years, 16 female pairs) over two consecutive weeks. Results showed substantial inter-individual heterogeneity in person-specific non-shared environmental influences. The current study represents a first step in investigating environmental influences on intra-individual variability with an idiographic approach, and provides implications for future behavioural genetic studies to examine developmental processes from a microscopic angle. PMID:27040685

  1. Differentiating cognitive functions of poststroke patients with specific brain lesions: A preliminary study on the clinical utility of Cognistat-P.

    PubMed

    Chan, Sam C C; Chan, Chetwyn C H; Wu, Yi; Liu, Karen P Y; Xu, Yan-Wen

    2016-01-01

    The Cognistat is widely used to measure the cognitive profile of neurological patients. This study aimed to further obtain evidence on the construct and discriminative validity of the Putonghua version of the Cognistat (Cognistat-P) on poststroke patients with specific brain lesions. Cognistat-P was administered to poststroke patients (n = 98), as well as healthy elderly (n = 40) and adult (n = 34) participants as the control groups. Poststroke patients were further categorized into 4 lesion groups using standard brain slice templates. Exploratory factory analysis reflected a 2-factor structure for the Cognistat-P that resembles that for the original English version. The Construction, Similarities, and Judgment subtests were found to differentiate patients with frontal or parietal lesions from those with subcortical lesions (p < .01, R(2) = .48). The Construction subtest, tapping the "fluid" ability, was the most useful for differentiating patients with parietal lesions from those with subcortical lesions. The Similarities subtest together with the Construction subtest was the most useful for differentiating patients with frontal lesions from those with subcortical lesions. This study established the validity of the Cognistat-P for differentiating poststroke patients with specific brain lesions. Future studies should replicate the results on a larger sample size and test the clinical significance of the Cognistat-P profiles. PMID:26571130

  2. Generator acceptance test and inspection report

    SciTech Connect

    Johns, B.R.

    1997-07-24

    This Acceptance Test Report(ATR) is the completed testing and inspection of the new portable generator. The testing and inspection is to verify that the generator provided by the vendor meets the requirements of specification WHC-S-0252, Revision 2. Attached is various other documentation to support the inspection and testing.

  3. Examining Social Acceptance & Rejection. FPG Snapshot #44

    ERIC Educational Resources Information Center

    FPG Child Development Institute, 2007

    2007-01-01

    This FPG Snapshot summarizes the findings of a study, published in the November 2006 issue of the "Journal of Educational Psychology," that examined whether children with disabilities are accepted or rejected by their classmates in inclusive classrooms. Specifically, the study examined two sets of related questions: (1) Are individual children…

  4. Void fraction instrument acceptance test procedure

    SciTech Connect

    Pearce, K.L.

    1994-09-15

    This acceptance test procedure (ATP) was written to test the void fraction instrument (VFI) and verify that the unit is ready for field service. The procedure verifies that the mechanical and electrical features (not specifically addressed in the software ATP) and software alarms are operating as designed.

  5. Heterologous expression, purification, crystallization and preliminary X-ray analysis of raucaffricine glucosidase, a plant enzyme specifically involved in Rauvolfia alkaloid biosynthesis

    SciTech Connect

    Ruppert, Martin; Panjikar, Santosh; Barleben, Leif; Stöckigt, Joachim

    2006-03-01

    Raucaffricine glucosidase, an enzyme involved in the biosynthesis of monoterpenoid indole alkaloids in the plant Rauvolfia serpentina, was crystallized by the hanging-drop vapour-diffusion method using PEG4000 as precipitant. The crystals diffract to 2.3 Å resolution and belong to space group I222. Raucaffricine glucosidase (RG) is an enzyme that is specifically involved in the biosynthesis of indole alkaloids from the plant Rauvolfia serpentina. After heterologous expression in Escherichia coli cells, crystals of RG were obtained by the hanging-drop vapour-diffusion technique at 293 K with 0.3 M ammonium sulfate, 0.1 M sodium acetate pH 4.6 buffer and 11% PEG 4000 as precipitant. Crystals belong to space group I222 and diffract to 2.30 Å, with unit-cell parameters a = 102.8, b = 127.3, c = 215.8 Å.

  6. Preliminary systems design study assessment report. [Evaluation of using specific technologies, system concepts for treating the buried waste and surrounding contaminated soil

    SciTech Connect

    Mayberry, J.L.; Feizollahi, F.; Del Signore, J.C.

    1992-01-01

    The System Design Study (SDS), part of the Waste Technology Development Department at the Idaho National Engineering Laboratory (INEL), examined techniques available for the remediation of hazardous and transuranic waste stored at the Radioactive Waste Management Complex's Subsurface Disposal Area at the INEL. Using specific technologies, system concepts for treating the buried waste and the surrounding contaminated soil were evaluated. Evaluation included implementability, effectiveness, and cost. The SDS resulted in the development of technology requirements including demonstration, testing, and evaluation activities needed for implementing each. This volume contains the descriptions and other relevant information of the four subsystems required for most of the ex situ processing systems. This volume covers the metal decontamination and sizing subsystem, soils processing subsystem, low-level waste subsystem, and retrieval subsystem.

  7. Preliminary study on the inhibition of nuclear internalization of Tat peptides by conjugation with a receptor-specific peptide and fluorescent dyes

    NASA Astrophysics Data System (ADS)

    Shen, Duanwen; Liang, Kexiang; Ye, Yunpeng; Tetteh, Elizabeth; Achilefu, Samuel

    2006-02-01

    Numerous studies have shown that basic Tat peptide (48-57) internalized non-specifically in cells and localized in the nucleus. However, localization of imaging agents in cellular nucleus is not desirable because of the potential mutagenesis. When conjugated to the peptides that undergo receptor-mediated endocytosis, Tat peptide could target specific cells or pathologic tissue. We tested this hypothesis by incorporating a somatostatin receptor-avid peptide (octreotate, Oct) and two different fluorescent dyes, Cypate 2 (Cy2) and fluorescein 5'-carboxlic acid (5-FAM), into the Tat-peptide sequence. In addition to the Cy2 or 5-FAM-labeled Oct conjugated to Tat peptide (Tat) to produce Tat-Oct-Cypate2 or Tat-Oct-5-FAM, we also labeled the Tat the Tat peptide with these dyes (Tat-Cy2 and Tat-5-FAM) to serve as positive control. A somatostatin receptor-positive pancreatic tumor cell line, AR42J, was used to assess cell internalization. The results show that Tat-5-FAM and Tat-Cypate2 localized in both nucleus and cytoplasm of the cells. In contrast to Tat-Oct-Cypate2, which localized in both the cytoplasm and nucleus, Tat-Oct-5-FAM internalized in the cytoplasm but not in the nucleus of AR42J cells. The internalizations were inhibited by adding non-labeled corresponding peptides, suggesting that the endocytoses of each group of labeled and the corresponding unlabeled compounds occurred through a common pathway. Thus, fluorescent probes and endocytosis complex between octreotate and somatostatin receptors in cytoplasm could control nuclear internalization of Tat peptides.

  8. 75 FR 71103 - Hampshire Paper Company; Notice of Application Accepted for Filing, Soliciting Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-22

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Hampshire Paper Company; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Preliminary Terms and Conditions, and Preliminary...

  9. Therapists' and patients' stress responses during graduated versus flooding in vivo exposure in the treatment of specific phobia: A preliminary observational study.

    PubMed

    Schumacher, Sarah; Miller, Robert; Fehm, Lydia; Kirschbaum, Clemens; Fydrich, Thomas; Ströhle, Andreas

    2015-12-15

    Exposure therapy is considered an effective treatment strategy for phobic anxiety, however, it is rarely applied in clinical practice. The under-usage might be due to various factors of which heightened stress levels not only in patients but also in therapists are presumed to be of particular relevance. The present study aimed to investigate whether different forms of exposure might lead to varying physiological and psychological stress responses in therapists and phobic patients. 25 patients with specific phobia underwent individual cognitive behavioural therapy, performed by 25 psychotherapist trainees, applying exposure sessions in graduated form or the flooding technique. Patients and therapists provided subjective evaluations of stress and five saliva samples for analysis of salivary cortisol and alpha-amylase either during two graduated exposure sessions or during one flooding session, while a regular therapy session served as control condition. Therapists displayed heightened salivary alpha-amylase release during exposure of the flooding, but not the graduated, type. Patients showed elevated salivary cortisol during flooding exposure numerically, however, not on a statistically significant level. Therapists reported more pronounced subjective stress during flooding compared to graduated exposure. Elevated stress levels should be addressed in clinical training in order to improve application of exposure in routine practice. PMID:26545614

  10. Crystallization and preliminary X-ray diffraction analysis of the Fab fragment of WO2, an antibody specific for the Aβ peptides associated with Alzheimer’s disease

    SciTech Connect

    Wun, Kwok S.; Miles, Luke A.; Crespi, Gabriela A. N.; Wycherley, Kaye; Ascher, David B.; Barnham, Kevin J.; Cappai, Roberto; Beyreuther, Konrad; Masters, Colin L.; Parker, Michael W.; McKinstry, William J.

    2008-05-01

    Crystallization and X-ray diffraction data collection of the Fab fragment of the monoclonal antibody WO2 in the absence or presence of amyloid β peptides associated with Alzheimer’s disease are reported. The murine monoclonal antibody WO2 specifically binds the N-terminal region of the amyloid β peptide (Aβ) associated with Alzheimer’s disease. This region of Aβ has been shown to be the immunodominant B-cell epitope of the peptide and hence is considered to be a basis for the development of immunotherapeutic strategies against this prevalent cause of dementia. Structural studies have been undertaken in order to characterize the molecular basis for antibody recognition of this important epitope. Here, details of the crystallization and X-ray analysis of the Fab fragment of the unliganded WO2 antibody in two crystal forms and of the complexes that it forms with the truncated Aβ peptides Aβ{sub 1–16} and Aβ{sub 1–28} are presented. These crystals were all obtained using the hanging-drop vapour-diffusion method at 295 K. Crystals of WO2 Fab were grown in polyethylene glycol solutions containing ZnSO{sub 4}; they belonged to the orthorhombic space group P2{sub 1}2{sub 1}2{sub 1} and diffracted to 1.6 Å resolution. The complexes of WO2 Fab with either Aβ{sub 1–@}@{sub 16} or Aβ{sub 1–28} were cocrystallized from polyethylene glycol solutions. These two complex crystals grew in the same space group, P2{sub 1}2{sub 1}2{sub 1}, and diffracted to 1.6 Å resolution. A second crystal form of WO2 Fab was grown in the presence of the sparingly soluble Aβ{sub 1–42} in PEG 550 MME. This second form belonged to space group P2{sub 1} and diffracted to 1.9 Å resolution.

  11. Development and preliminary data on the use of a mobile app specifically designed to increase community awareness of invasive pneumococcal disease and its prevention.

    PubMed

    Panatto, Donatella; Domnich, Alexander; Gasparini, Roberto; Bonanni, Paolo; Icardi, Giancarlo; Amicizia, Daniela; Arata, Lucia; Bragazzi, Nicola Luigi; Signori, Alessio; Landa, Paolo; Bechini, Angela; Boccalini, Sara

    2016-04-01

    Given the growing use and great potential of mobile apps, this project aimed to develop and implement a user-friendly app to increase laypeople's knowledge and awareness of invasive pneumococcal disease (IPD). Despite the heavy burden of IPD, the documented low awareness of IPD among both laypeople and healthcare professionals and far from optimal pneumococcal vaccination coverage, no app specifically targeting IPD has been developed so far. The app was designed to be maximally functional and conceived in accordance with user-centered design. Its content, layout and usability were discussed and formally tested during several workshops that involved the principal stakeholders, including experts in IPD and information technology and potential end-users. Following several workshops, it was decided that, in order to make the app more interactive, its core should be a personal "checker" of the risk of contracting IPD and a user-friendly risk-communication strategy. The checker was populated with risk factors identified through both Italian and international official guidelines. Formal evaluation of the app revealed its good readability and usability properties. A sister web site with the same content was created to achieve higher population exposure. Seven months after being launched in a price- and registration-free modality, the app, named "Pneumo Rischio," averaged 20.9 new users/day and 1.3 sessions/user. The first in-field results suggest that "Pneumo Rischio" is a promising tool for increasing the population's awareness of IPD and its prevention through a user-friendly risk checker. PMID:26795065

  12. Development and preliminary data on the use of a mobile app specifically designed to increase community awareness of invasive pneumococcal disease and its prevention

    PubMed Central

    Panatto, Donatella; Domnich, Alexander; Gasparini, Roberto; Bonanni, Paolo; Icardi, Giancarlo; Amicizia, Daniela; Arata, Lucia; Bragazzi, Nicola Luigi; Signori, Alessio; Landa, Paolo; Bechini, Angela; Boccalini, Sara

    2016-01-01

    ABSTRACT Given the growing use and great potential of mobile apps, this project aimed to develop and implement a user-friendly app to increase laypeople's knowledge and awareness of invasive pneumococcal disease (IPD). Despite the heavy burden of IPD, the documented low awareness of IPD among both laypeople and healthcare professionals and far from optimal pneumococcal vaccination coverage, no app specifically targeting IPD has been developed so far. The app was designed to be maximally functional and conceived in accordance with user-centered design. Its content, layout and usability were discussed and formally tested during several workshops that involved the principal stakeholders, including experts in IPD and information technology and potential end-users. Following several workshops, it was decided that, in order to make the app more interactive, its core should be a personal “checker” of the risk of contracting IPD and a user-friendly risk-communication strategy. The checker was populated with risk factors identified through both Italian and international official guidelines. Formal evaluation of the app revealed its good readability and usability properties. A sister web site with the same content was created to achieve higher population exposure. Seven months after being launched in a price- and registration-free modality, the app, named “Pneumo Rischio,” averaged 20.9 new users/day and 1.3 sessions/user. The first in-field results suggest that “Pneumo Rischio” is a promising tool for increasing the population's awareness of IPD and its prevention through a user-friendly risk checker. PMID:26795065

  13. Crystallization and preliminary X-ray diffraction analysis of the Fab fragment of WO2, an antibody specific for the A[beta] peptides associated with Alzheimer's disease

    SciTech Connect

    Wun, Kwok S.; Miles, Luke A.; Crespi, Gabriela A.N.; Wycherley, Kaye; Ascher, David B.; Barnham, Kevin J.; Cappai, Roberto; Beyreuther, Konrad; Masters, Colin L.; Parker, Michael W.; McKinstry, William J.

    2008-05-28

    The murine monoclonal antibody WO2 specifically binds the N-terminal region of the amyloid {beta} peptide (A{beta}) associated with Alzheimer's disease. This region of A{beta} has been shown to be the immunodominant B-cell epitope of the peptide and hence is considered to be a basis for the development of immunotherapeutic strategies against this prevalent cause of dementia. Structural studies have been undertaken in order to characterize the molecular basis for antibody recognition of this important epitope. Here, details of the crystallization and X-ray analysis of the Fab fragment of the unliganded WO2 antibody in two crystal forms and of the complexes that it forms with the truncated Az{beta} peptides A{beta}{sub 1-16} and A{beta}{sub 1-28} are presented. These crystals were all obtained using the hanging-drop vapour-diffusion method at 295 K. Crystals of WO2 Fab were grown in polyethylene glycol solutions containing ZnSO{sub 4}; they belonged to the orthorhombic space group P2{sub 1}2{sub 1}2{sub 1} and diffracted to 1.6 {angstrom} resolution. The complexes of WO2 Fab with either A{beta}{sub 1-16} or A{beta}{sub 1-28} were cocrystallized from polyethylene glycol solutions. These two complex crystals grew in the same space group, P2{sub 1}2{sub 1}2{sub 1}, and diffracted to 1.6 {angstrom} resolution. A second crystal form of WO2 Fab was grown in the presence of the sparingly soluble A{beta}{sub 1-42} in PEG 550 MME. This second form belonged to space group P2{sub 1} and diffracted to 1.9 {angstrom} resolution.

  14. Sonic boom acceptability studies

    NASA Astrophysics Data System (ADS)

    Shepherd, Kevin P.; Sullivan, Brenda M.; Leatherwood, Jack D.; McCurdy, David A.

    1992-04-01

    The determination of the magnitude of sonic boom exposure which would be acceptable to the general population requires, as a starting point, a method to assess and compare individual sonic booms. There is no consensus within the scientific and regulatory communities regarding an appropriate sonic boom assessment metric. Loudness, being a fundamental and well-understood attribute of human hearing was chosen as a means of comparing sonic booms of differing shapes and amplitudes. The figure illustrates the basic steps which yield a calculated value of loudness. Based upon the aircraft configuration and its operating conditions, the sonic boom pressure signature which reaches the ground is calculated. This pressure-time history is transformed to the frequency domain and converted into a one-third octave band spectrum. The essence of the loudness method is to account for the frequency response and integration characteristics of the auditory system. The result of the calculation procedure is a numerical description (perceived level, dB) which represents the loudness of the sonic boom waveform.

  15. Sonic boom acceptability studies

    NASA Technical Reports Server (NTRS)

    Shepherd, Kevin P.; Sullivan, Brenda M.; Leatherwood, Jack D.; Mccurdy, David A.

    1992-01-01

    The determination of the magnitude of sonic boom exposure which would be acceptable to the general population requires, as a starting point, a method to assess and compare individual sonic booms. There is no consensus within the scientific and regulatory communities regarding an appropriate sonic boom assessment metric. Loudness, being a fundamental and well-understood attribute of human hearing was chosen as a means of comparing sonic booms of differing shapes and amplitudes. The figure illustrates the basic steps which yield a calculated value of loudness. Based upon the aircraft configuration and its operating conditions, the sonic boom pressure signature which reaches the ground is calculated. This pressure-time history is transformed to the frequency domain and converted into a one-third octave band spectrum. The essence of the loudness method is to account for the frequency response and integration characteristics of the auditory system. The result of the calculation procedure is a numerical description (perceived level, dB) which represents the loudness of the sonic boom waveform.

  16. Acceptance and Commitment Therapy for Generalized Social Anxiety Disorder: A Pilot Study

    ERIC Educational Resources Information Center

    Dalrymple, Kristy L.; Herbert, James D.

    2007-01-01

    Despite the demonstrated efficacy of cognitive-behavior therapy (CBT) for social anxiety disorder (SAD), many individuals do not respond to treatment or demonstrate residual symptoms and impairment posttreatment. Preliminary evidence indicates that acceptance-based approaches (e.g., acceptance and commitment therapy; ACT) can be helpful for a…

  17. 10 CFR 960.3-1-4-1 - Site identification as potentially acceptable.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Site identification as potentially acceptable. 960.3-1-4-1 Section 960.3-1-4-1 Energy DEPARTMENT OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Implementation Guidelines § 960.3-1-4-1 Site identification as potentially acceptable. The...

  18. 10 CFR 960.3-1-4-1 - Site identification as potentially acceptable.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Site identification as potentially acceptable. 960.3-1-4-1 Section 960.3-1-4-1 Energy DEPARTMENT OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Implementation Guidelines § 960.3-1-4-1 Site identification as potentially acceptable. The...

  19. 10 CFR 960.3-1-4-1 - Site identification as potentially acceptable.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Site identification as potentially acceptable. 960.3-1-4-1 Section 960.3-1-4-1 Energy DEPARTMENT OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Implementation Guidelines § 960.3-1-4-1 Site identification as potentially acceptable. The...

  20. Hanford Site solid waste acceptance criteria

    SciTech Connect

    Ellefson, M.D.

    1998-07-01

    Order 5820.2A requires that each treatment, storage, and/or disposal facility (referred to in this document as TSD unit) that manages low-level or transuranic waste (including mixed waste and TSCA PCB waste) maintain waste acceptance criteria. These criteria must address the various requirements to operate the TSD unit in compliance with applicable safety and environmental requirements. This document sets forth the baseline criteria for acceptance of radioactive waste at TSD units operated by WMH. The criteria for each TSD unit have been established to ensure that waste accepted can be managed in a manner that is within the operating requirements of the unit, including environmental regulations, DOE Orders, permits, technical safety requirements, waste analysis plans, performance assessments, and other applicable requirements. Acceptance criteria apply to the following TSD units: the Low-Level Burial Grounds (LLBG) including both the nonregulated portions of the LLBG and trenches 31 and 34 of the 218-W-5 Burial Ground for mixed waste disposal; Central Waste Complex (CWC); Waste Receiving and Processing Facility (WRAP); and T Plant Complex. Waste from all generators, both from the Hanford Site and from offsite facilities, must comply with these criteria. Exceptions can be granted as provided in Section 1.6. Specific waste streams could have additional requirements based on the 1901 identified TSD pathway. These requirements are communicated in the Waste Specification Records (WSRds). The Hanford Site manages nonradioactive waste through direct shipments to offsite contractors. The waste acceptance requirements of the offsite TSD facility must be met for these nonradioactive wastes. This document does not address the acceptance requirements of these offsite facilities.

  1. Children acceptance of laser dental treatment

    NASA Astrophysics Data System (ADS)

    Lazea, Andreea; Todea, Carmen

    2016-03-01

    Objectives: To evaluate the dental anxiety level and the degree of acceptance of laser assisted pedodontic treatments from the children part. Also, we want to underline the advantages of laser use in pediatric dentistry, to make this technology widely used in treating dental problems of our children patients. Methods: Thirty pediatric dental patients presented in the Department of Pedodontics, University of Medicine and Pharmacy "Victor Babeş", Timişoara were evaluated using the Wong-Baker pain rating scale, wich was administered postoperatory to all patients, to assess their level of laser therapy acceptance. Results: Wong-Baker faces pain rating scale (WBFPS) has good validity and high specificity; generally it's easy for children to use, easy to compare and has good feasibility. Laser treatment has been accepted and tolerated by pediatric patients for its ability to reduce or eliminate pain. Around 70% of the total sample showed an excellent acceptance of laser dental treatment. Conclusions: Laser technology is useful and effective in many clinical situations encountered in pediatric dentistry and a good level of pacient acceptance is reported during all laser procedures on hard and soft tissues.

  2. W-026, acceptance test report manipulator system

    SciTech Connect

    Watson, T.L.

    1997-04-15

    The purpose of the WRAP Manipulator System Acceptance Test Plan (ATP) is to verify that the 4 glovebox sets of WRAP manipulator components, including rail/carriage, slave arm, master controller and auxiliary equipment, meets the requirements of the functional segments of 14590 specification. The demonstration of performance elements of the ATP are performed as a part of the Assembly specifications. Manipulator integration is integrated in the performance testing of the gloveboxes. Each requirement of the Assembly specification will be carried out in conjunction with glovebox performance tests.

  3. 46 CFR 164.120-7 - Acceptance criteria.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 6 2012-10-01 2012-10-01 false Acceptance criteria. 164.120-7 Section 164.120-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL MATERIALS Fire Retardant Resins for Lifeboats and Rescue Boats § 164.120-7 Acceptance criteria. (a) The laminating...

  4. Structural acceptance criteria Remote Handling Building Tritium Extraction Facility

    SciTech Connect

    Mertz, G.

    1999-12-16

    This structural acceptance criteria contains the requirements for the structural analysis and design of the Remote Handling Building (RHB) in the Tritium Extraction Facility (TEF). The purpose of this acceptance criteria is to identify the specific criteria and methods that will ensure a structurally robust building that will safely perform its intended function and comply with the applicable Department of Energy (DOE) structural requirements.

  5. 46 CFR 164.023-11 - Acceptance tests.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 6 2014-10-01 2014-10-01 false Acceptance tests. 164.023-11 Section 164.023-11 Shipping...: SPECIFICATIONS AND APPROVAL MATERIALS Thread for Personal Flotation Devices § 164.023-11 Acceptance tests. (a) Performance testing. Manufacturers shall ensure that the performance tests described in § 164.023-7 (a) or...

  6. Development and Validation of the Korean Rape Myth Acceptance Scale

    ERIC Educational Resources Information Center

    Oh, Euna; Neville, Helen

    2004-01-01

    The purpose of this investigation was to develop a culturally relevant rape myth acceptance scale for Koreans. Three studies on the Korean Rape Myth Acceptance Scale (KRMAS) with approximately 1,000 observations provide initial validity and reliability. Specifically, results from exploratory and confirmatory factor analyses support four subscales:…

  7. Validation and acceptance of synthetic infrared imagery

    NASA Astrophysics Data System (ADS)

    Smith, Moira I.; Bernhardt, Mark; Angell, Christopher R.; Hickman, Duncan; Whitehead, Philip; Patel, Dilip

    2004-08-01

    This paper describes the use of an image query database (IQ-DB) tool as a means of implementing a validation strategy for synthetic long-wave infrared images of sea clutter. Specifically it was required to determine the validity of the synthetic imagery for use in developing and testing automatic target detection algorithms. The strategy adopted for exploiting synthetic imagery is outlined and the key issues of validation and acceptance are discussed in detail. A wide range of image metrics has been developed to achieve pre-defined validation criteria. A number of these metrics, which include post processing algorithms, are presented. Furthermore, the IQ-DB provides a robust mechanism for configuration management and control of the large volume of data used. The implementation of the IQ-DB is reviewed in terms of its cardinal point specification and its central role in synthetic imagery validation and EOSS progressive acceptance.

  8. Accepters and Rejecters of Counseling.

    ERIC Educational Resources Information Center

    Rose, Harriett A.; Elton, Charles F.

    Personality differences between students who accept or reject proffered counseling assistance were investigated by comparing personality traits of 116 male students at the University of Kentucky who accepted or rejected letters of invitation to group counseling. Factor analysis of Omnibus Personality Inventory (OPI) scores to two groups of 60 and…

  9. Breathing air trailer acceptance test report

    SciTech Connect

    Kostelnik, A.J.

    1996-02-12

    This Acceptance Test Report documents compliance with the requirements of specification WHC-S-0251, Rev.0 and ECNs 613530 and 606113. The equipment was tested according to WHC-SD-WM-ATP-104. The equipment tested is a Breathing Air Supply Trailer purchased as a design and fabrication procurement activity. The ATP was written by the Seller and was performed by the Seller with representatives of the Westinghouse Hanford Company witnessing portions of the test at the Seller`s location.

  10. Perinatal Dyadic Psychotherapy: Design, Implementation, and Acceptability

    PubMed Central

    Goodman, Janice H.; Guarino, AJ.; Prager, Joanna

    2014-01-01

    Maternal postpartum depression (PPD) and mother-infant relationship dysfunction have reciprocal effects on each other and thus an integrated approach that addresses both problems simultaneously may lead to improved outcomes. This study aimed to determine the feasibility, acceptability, and preliminary efficacy of a new intervention, Perinatal Dyadic Psychotherapy (PDP), for the early treatment of maternal PPD. PDP is designed to promote maternal mental health and facilitate optimal mother-infant relationships via (a) a supportive, relationship-based, mother-infant psychotherapeutic component, and (b) a developmentally-based infant-oriented component focused on promoting positive mother-infant interactions. This paper describes the pilot use of PDP with six acutely depressed postpartum women. Nurses delivered the intervention over eight home visits. Results indicate that PDP is a feasible, acceptable, and safe intervention with this population. All participants achieved remission of depression with significant reduction in of depression and anxiety symptoms, suggesting that PDP is a promising treatment for PPD. PMID:23562990

  11. Preliminary Design Reviews Project: SAPHIRE 8

    SciTech Connect

    Kurt G. Vedros; Curtis L. Smith

    2011-09-01

    The Preliminary Design Review (PDR) is intended to be performed at the conceptual phase of a design request. The design request is initiated with a Design Specification document which includes a problem statement, design details, a design checklist and supporting documentation and/or projected sample output. In addition to this, the design specification has a chapter devoted to the completion of the Preliminary Design Review. This document describes the process of documentation of the PDR in the Design Specification.

  12. Demystifying Learning Technology Standards. Part II: Acceptance and Implementation.

    ERIC Educational Resources Information Center

    Sonwalkar, Nishikant

    2002-01-01

    Discussion of learning technology standards focuses on acceptance and implementation, illustrated by SCORM specifications as applied to courseware development. Highlights include course structure; content hierarchy; multimedia assets; sharable content objects (SCOs); content aggregation; content packaging; categories of metadata; and content…

  13. Differences in HIV vaccine acceptability between genders.

    PubMed

    Kakinami, Lisa; Newman, Peter A; Lee, Sung-Jae; Duan, Naihua

    2008-05-01

    The development of safe and efficacious preventive HIV vaccines offers the best long-term hope of controlling the AIDS pandemic. Nevertheless, suboptimal uptake of safe and efficacious vaccines that already exist suggest that HIV vaccine acceptability cannot be assumed, particularly among communities most vulnerable to HIV. The present study aimed to identify barriers and motivators to future HIV vaccine acceptability among low socioeconomic, ethnically diverse men and women in Los Angeles County. Participants completed a cross-sectional survey assessing their attitudes and beliefs regarding future HIV vaccines. Hypothetical HIV vaccine scenarios were administered to determine HIV vaccine acceptability. Two-sided t-tests were performed, stratified by gender, to examine the association between vaccine acceptability and potential barriers and motivators. Barriers to HIV vaccine acceptability differed between men and women. For women, barriers to HIV vaccine acceptability were related to their intimate relationships (p<0.05), negative experiences with health care providers (p<0.05) and anticipated difficulties procuring insurance (p<0.01). Men were concerned that the vaccine would weaken the immune system (p<0.005) or would affect their HIV test results (p<0.05). Motivators for women included the ability to conceive a child without worrying about contracting HIV (p<0.10) and support from their spouse/significant other for being vaccinated (p<0.10). Motivators for men included feeling safer with sex partners (p<0.05) and social influence from friends to get vaccinated (p<0.005). Family support for HIV immunization was a motivator for both men and women (p<0.10). Gender-specific interventions may increase vaccine acceptability among men and women at elevated risk for HIV infection. Among women, interventions need to focus on addressing barriers due to gendered power dynamics in relationships and discrimination in health care. Among men, education that addresses fears

  14. The mannose-specific lectin domains of Flo1p from Saccharomyces cerevisiae and Lg-Flo1p from S. pastorianus: crystallization and preliminary X-ray diffraction analysis of the adhesin–carbohydrate complexes

    PubMed Central

    Ielasi, Francesco S.; Goyal, Parveen; Sleutel, Mike; Wohlkonig, Alexandre; Willaert, Ronnie G.

    2013-01-01

    Flo1p and Lg-Flo1p are two cell-wall adhesins belonging to the Flo (flocculation) protein family from the yeasts Saccharomyces cerevisiae and S. pastorianus. The main function of these modular proteins endowed with calcium-dependent lectin activity is to mediate cell–cell adhesion events during yeast flocculation, a process which is well known at the cellular level but still not fully characterized from a molecular perspective. Recently, structural features of the N-terminal Flo lectin domains, including the N-terminal domain of Lg-Flo1p (N-Lg-Flo1p), and their interactions with carbohydrate molecules have been investigated. However, structural data concerning the N-terminal domain of Flo1p (N-Flo1p), which is the most specific among the Flo proteins, are missing and information about the N-Lg-Flo1p–carbohydrate interaction still lacks detailed structural insight. Here, the crystallization and preliminary X-ray characterization of the apo form and the mannose complex of N-Flo1p and X-ray analysis of N-Lg-Flo1p crystals soaked in α-1,2-mannobiose are reported. The N-Flo1p crystals diffracted to a resolution of 1.43 Å in the case of the apo form and to 2.12 Å resolution for the mannose complex. Both crystals were orthorhombic and belonged to space group P212121, with one molecule in the asymmetric unit. The N-Lg-Flo1p–α-1,2-mannobiose complex crystal diffracted to 1.73 Å resolution and belonged to the monoclinic space group P1211 with two molecules in the asymmetric unit. PMID:23832207

  15. End User Acceptance - Requirements or Specifications, Certification, Testing

    NASA Technical Reports Server (NTRS)

    Jeevarajan, Judith

    2013-01-01

    NASA follows top level safety requirement of two-failure tolerance (t hree levels of controls or design for minimum risk) to all catastroph ic hazards in the design of safe li-ion batteries for space use. ? R igorous development testing at appropriate levels to credible offnominal conditions and review of test data. ? Implement robust design con trols based on test results and test again to confirm safety at the a ppropriate levels. ? Stringent testing of all (100%) flight batteries (from button cells to large batteries).

  16. Web-based Acceptance and Commitment Therapy Smoking Cessation Treatment for Smokers with Depressive Symptoms

    PubMed Central

    Jones, Helen A.; Heffner, Jaimee L.; Mercer, Laina; Wyszynski, Christopher M.; Vilardaga, Roger

    2014-01-01

    Objective Smokers with depressive symptoms have more difficulty quitting smoking than the general population of smokers. The present study examines a web-based treatment using Acceptance and Commitment Therapy (ACT) for smokers with depressive symptoms. The study aimed to determine participant receptivity to the intervention and its effects on smoking cessation, acceptance of internal cues, and depressive symptoms. Methods Smokers who screened positive for depressive symptoms at baseline (n = 94) were selected from a randomized controlled trial (N = 222) comparing web-based ACT for smoking cessation (Webquit.org) with Smokefree.gov. Forty-five participants (48%) completed the three-month follow-up. Results Compared to Smokefree.gov, WebQuit participants spent significantly more time on site (p = 0.001) and had higher acceptance of physical cravings (p = 0.033). While not significant, WebQuit participants were more engaged and satisfied with their program and were more accepting of internal cues overall. There was preliminary evidence that WebQuit participants had higher quit rates (20% vs. 12%) and lower depressive symptoms at follow-up (45% vs. 56%) than those in Smokefree.gov. Conclusions This was the first study of web-based ACT for smoking cessation among smokers with depressive symptoms, with promising evidence of receptivity, efficacy, impact on a theory-based change process, and possible secondary effects on depression. A fully powered trial of the ACT Webquit.org intervention specifically for depressed smokers is needed. This was part of a clinical trial registered as NCT#01166334, at www.clinicaltrials.gov. PMID:25671683

  17. Modeling of a Parabolic Trough Solar Field for Acceptance Testing: A Case Study

    SciTech Connect

    Wagner, M. J.; Mehos, M. S.; Kearney, D. W.; McMahan, A. C.

    2011-01-01

    As deployment of parabolic trough concentrating solar power (CSP) systems ramps up, the need for reliable and robust performance acceptance test guidelines for the solar field is also amplified. Project owners and/or EPC contractors often require extensive solar field performance testing as part of the plant commissioning process in order to ensure that actual solar field performance satisfies both technical specifications and performance guaranties between the involved parties. Performance test code work is currently underway at the National Renewable Energy Laboratory (NREL) in collaboration with the SolarPACES Task-I activity, and within the ASME PTC-52 committee. One important aspect of acceptance testing is the selection of a robust technology performance model. NREL1 has developed a detailed parabolic trough performance model within the SAM software tool. This model is capable of predicting solar field, sub-system, and component performance. It has further been modified for this work to support calculation at subhourly time steps. This paper presents the methodology and results of a case study comparing actual performance data for a parabolic trough solar field to the predicted results using the modified SAM trough model. Due to data limitations, the methodology is applied to a single collector loop, though it applies to larger subfields and entire solar fields. Special consideration is provided for the model formulation, improvements to the model formulation based on comparison with the collected data, and uncertainty associated with the measured data. Additionally, this paper identifies modeling considerations that are of particular importance in the solar field acceptance testing process and uses the model to provide preliminary recommendations regarding acceptable steady-state testing conditions at the single-loop level.

  18. Accepted scientific research works (abstracts).

    PubMed

    2014-01-01

    These are the 39 accepted abstracts for IAYT's Symposium on Yoga Research (SYR) September 24-24, 2014 at the Kripalu Center for Yoga & Health and published in the Final Program Guide and Abstracts. PMID:25645134

  19. L-286 Acceptance Test Record

    SciTech Connect

    HARMON, B.C.

    2000-01-14

    This document provides a detailed account of how the acceptance testing was conducted for Project L-286, ''200E Area Sanitary Water Plant Effluent Stream Reduction''. The testing of the L-286 instrumentation system was conducted under the direct supervision

  20. Social Acceptance of Wind Power in the United States: Evaluating Stakeholder Perspectives (Poster)

    SciTech Connect

    Tegen, S.; Lantz, E.

    2009-05-01

    As the wind industry strives to achieve 20% wind energy by 2030, maintaining high levels of social acceptance for wind energy will become increasingly important. Wind Powering America is currently researching stakeholder perspectives in the U.S. market and reviewing findings from wind energy projects around the world to better understand social acceptance barriers. Results from European studies show that acceptance varies widely depending on local community values. A preliminary survey shows similar results in the United States. Further research will be conducted to refine our understanding of key social acceptance barriers and evaluate the best ways to mitigate negative perspectives on wind power.

  1. FINAL DISPOSAL OF RADIOACTIVE WASTE IN GERMANY: PLAN APPROVAL PROCESS OF KONRAD MINE AND ACCEPTANCE REQUIREMENTS

    SciTech Connect

    Bandt, Gabriele; Posnatzki, Britta; Beckers, Klaus-Arno

    2003-02-27

    Currently no final repository for any type of radioactive waste is operated in Germany. Preliminary Final Storage Acceptance Requirements for radioactive waste packages were published in 1995. Up to now these are the basis for treatment of radioactive waste in Germany. After licensing of the final repository these preliminary waste acceptance requirements are completed with licensing conditions. Some of these conditions affect the preliminary waste acceptance requirements, e. g. behavior of chemo-toxic substances in case of accidents in the final repository or the allowed maximum concentration of fissile material. The presented examples of radioactive waste conditioning campaigns demonstrate that no difficulties are expected in management, characterization and quality assurance of radioactive wastes due to the licensing conditions.

  2. Defining acceptable conditions in wilderness

    NASA Astrophysics Data System (ADS)

    Roggenbuck, J. W.; Williams, D. R.; Watson, A. E.

    1993-03-01

    The limits of acceptable change (LAC) planning framework recognizes that forest managers must decide what indicators of wilderness conditions best represent resource naturalness and high-quality visitor experiences and how much change from the pristine is acceptable for each indicator. Visitor opinions on the aspects of the wilderness that have great impact on their experience can provide valuable input to selection of indicators. Cohutta, Georgia; Caney Creek, Arkansas; Upland Island, Texas; and Rattlesnake, Montana, wilderness visitors have high shared agreement that littering and damage to trees in campsites, noise, and seeing wildlife are very important influences on wilderness experiences. Camping within sight or sound of other people influences experience quality more than do encounters on the trails. Visitors’ standards of acceptable conditions within wilderness vary considerably, suggesting a potential need to manage different zones within wilderness for different clientele groups and experiences. Standards across wildernesses, however, are remarkably similar.

  3. From requirements to acceptance tests

    NASA Technical Reports Server (NTRS)

    Baize, Lionel; Pasquier, Helene

    1993-01-01

    From user requirements definition to accepted software system, the software project management wants to be sure that the system will meet the requirements. For the development of a telecommunication satellites Control Centre, C.N.E.S. has used new rules to make the use of tracing matrix easier. From Requirements to Acceptance Tests, each item of a document must have an identifier. A unique matrix traces the system and allows the tracking of the consequences of a change in the requirements. A tool has been developed, to import documents into a relational data base. Each record of the data base corresponds to an item of a document, the access key is the item identifier. Tracing matrix is also processed, providing automatically links between the different documents. It enables the reading on the same screen of traced items. For example one can read simultaneously the User Requirements items, the corresponding Software Requirements items and the Acceptance Tests.

  4. The MAGNEX large acceptance spectrometer

    SciTech Connect

    Cavallaro, M.; Cappuzzello, F.; Cunsolo, A.; Carbone, D.; Foti, A.

    2010-03-01

    The main features of the MAGNEX large acceptance magnetic spectrometer are described. It has a quadrupole + dipole layout and a hybrid detector located at the focal plane. The aberrations due to the large angular (50 msr) and momentum (+- 13%) acceptance are reduced by an accurate hardware design and then compensated by an innovative software ray-reconstruction technique. The obtained resolution in energy, angle and mass are presented in the paper. MAGNEX has been used up to now for different experiments in nuclear physics and astrophysics confirming to be a multipurpose device.

  5. Decoupling as a mechanism of change in mindfulness and acceptance: a literature review.

    PubMed

    Levin, Michael E; Luoma, Jason B; Haeger, Jack A

    2015-11-01

    A growing body of research within the acceptance and mindfulness-based therapies suggests that these treatments may function in part by reducing or eliminating (i.e., decoupling) the normative relationships between internal experiences and other internal/overt behavior. Examples of decoupling effects found in this review include reduced relationships between urges to smoke and smoking behavior, between dysphoric mood and depressive cognitions, and between pain intensity and persistence in a painful task. A literature review identified 44 studies on acceptance and mindfulness that demonstrated decoupling effects. Overall, preliminary evidence for decoupling effects were found across a broad range of problem areas, including substance abuse, depression, eating disorders, overeating, chronic pain, anxiety, relationships, anger, avoidance behavior, and self-harm, with the strongest evidence currently available in the area of substance abuse. However, the review also notes a general lack of replication studies on decoupling effects and the need for more well-powered and controlled research testing specific decoupling hypotheses. PMID:26349756

  6. Acceptability of male condom: An Indian scenario

    PubMed Central

    Donta, Balaiah; Begum, Shahina; Naik, D.D.

    2014-01-01

    The National Family Planning Programme of India had introduced condom as one of the family planning methods in the late1960s. Condom was promoted as a family planning method through social marketing since its inception. With the increasing prevalence and incidence of sexually transmitted infections (STIs) including HIV/AIDS, condom was also promoted as a dual method for protection against both unintended pregnancies as well as sexually transmitted infections. Despite efforts at various levels, the overall use of condom among couples in India is low. Here we present literature review of studies to understand the condom acceptability among couples in India. Specifically, the paper assesses research and programmes that have been carried out to increase the use of condom among couples; determinants of condom use; reason for not using condom; and perception versus experience of condom failure. The reported problems related to condom use included non acceptance by partner, perceived ineffectiveness, less comfort, lack of sexual satisfaction, husband's alcohol use, depression, and anxiety, and not available at that instant. The role of media in the promotion of condom use was indicated as an important way to increase awareness and use. Multiple strategies would help in acceptance of male condom. PMID:25673537

  7. Acceptability of male condom: an Indian scenario.

    PubMed

    Donta, Balaiah; Begum, Shahina; Naik, D D

    2014-11-01

    The National Family Planning Programme of India had introduced condom as one of the family planning methods in the late 1960s. Condom was promoted as a family planning method through social marketing since its inception. With the increasing prevalence and incidence of sexually transmitted infections (STIs) including HIV/AIDS, condom was also promoted as a dual method for protection against both unintended pregnancies as well as sexually transmitted infections. Despite efforts at various levels, the overall use of condom among couples in India is low. Here we present literature review of studies to understand the condom acceptability among couples in India. Specifically, the paper assesses research and programmes that have been carried out to increase the use of condom among couples; determinants of condom use; reason for not using condom; and perception versus experience of condom failure. The reported problems related to condom use included non acceptance by partner, perceived ineffectiveness, less comfort, lack of sexual satisfaction, husband's alcohol use, depression, and anxiety, and not available at that instant. The role of media in the promotion of condom use was indicated as an important way to increase awareness and use. Multiple strategies would help in acceptance of male condom. PMID:25673537

  8. Breathing air trailer acceptance test procedure

    SciTech Connect

    Kostelnik, A.J.

    1994-09-14

    This Acceptance Test Procedure (ATP) will document compliance with the requirements of WHC-S-0251 Rev. 0 and ECNs 613530 and 606113. The equipment being tested is a Breathing Air Supply Trailer purchased as a Design and Fabrication procurement activity for use in the core sampling program. The ATP was written by the Seller and will be performed by the Seller with representatives of the Westinghouse Hanford Company witnessing the test at the Seller`s location. This test procedure is to verify that the American Bristol Industries, Inc., Model 5014-0001 low pressure Mobile Breathing Air Trailer, meets or exceeds the requirements of the Westinghouse Hanford specification.

  9. Acceptance Probability (P a) Analysis for Process Validation Lifecycle Stages.

    PubMed

    Alsmeyer, Daniel; Pazhayattil, Ajay; Chen, Shu; Munaretto, Francesco; Hye, Maksuda; Sanghvi, Pradeep

    2016-04-01

    This paper introduces an innovative statistical approach towards understanding how variation impacts the acceptance criteria of quality attributes. Because of more complex stage-wise acceptance criteria, traditional process capability measures are inadequate for general application in the pharmaceutical industry. The probability of acceptance concept provides a clear measure, derived from specific acceptance criteria for each quality attribute. In line with the 2011 FDA Guidance, this approach systematically evaluates data and scientifically establishes evidence that a process is capable of consistently delivering quality product. The probability of acceptance provides a direct and readily understandable indication of product risk. As with traditional capability indices, the acceptance probability approach assumes that underlying data distributions are normal. The computational solutions for dosage uniformity and dissolution acceptance criteria are readily applicable. For dosage uniformity, the expected AV range may be determined using the s lo and s hi values along with the worst case estimates of the mean. This approach permits a risk-based assessment of future batch performance of the critical quality attributes. The concept is also readily applicable to sterile/non sterile liquid dose products. Quality attributes such as deliverable volume and assay per spray have stage-wise acceptance that can be converted into an acceptance probability. Accepted statistical guidelines indicate processes with C pk > 1.33 as performing well within statistical control and those with C pk < 1.0 as "incapable" (1). A C pk > 1.33 is associated with a centered process that will statistically produce less than 63 defective units per million. This is equivalent to an acceptance probability of >99.99%. PMID:26024723

  10. Helping Our Children Accept Themselves.

    ERIC Educational Resources Information Center

    Gamble, Mae

    1984-01-01

    Parents of a child with muscular dystrophy recount their reactions to learning of the diagnosis, their gradual acceptance, and their son's resistance, which was gradually lessened when he was provided with more information and treated more normally as a member of the family. (CL)

  11. Acceptability of Treatments for Plagiarism

    ERIC Educational Resources Information Center

    Carter, Stacy L.; Punyanunt-Carter, Narissra Maria

    2007-01-01

    This study focused on various treatments for addressing incidents of plagiarism by college students. College students rated the acceptability of different responses by college faculty to a case description of a college student who engaged in plagiarism. The findings revealed that students found some methods of addressing this problem behavior by…

  12. Euthanasia Acceptance: An Attitudinal Inquiry.

    ERIC Educational Resources Information Center

    Klopfer, Fredrick J.; Price, William F.

    The study presented was conducted to examine potential relationships between attitudes regarding the dying process, including acceptance of euthanasia, and other attitudinal or demographic attributes. The data of the survey was comprised of responses given by 331 respondents to a door-to-door interview. Results are discussed in terms of preferred…

  13. Treatment Acceptability Study of Walking The Middle Path, a New DBT Skills Module for Adolescents and their Families.

    PubMed

    Rathus, Jill; Campbell, Bevin; Miller, Alec; Smith, Heather

    2015-01-01

    In light of dialectic behavioral therapy's effectiveness in treating suicidal adults, the treatment has been adapted for use in diverse clinical populations, including adolescents who are suicidal and have multiple problem. Walking the Middle Path is a new skill- training module that addresses specific problems and skill deficits of adolescents and their families. The present study evaluated the acceptability of Walking the Middle Path, in order to establish a basis for further assessment of the module's effectiveness. Fifty participants receiving DBT for adolescent were administered a Treatment Acceptability Scale, a skills-rating scale and an open-ended, qualitative assessment. Results indicated high ratings of acceptability. Middle Path skills ranked highly among the DBT skills perceived as most helpful, with validation rated the most beneficial aspect of skills training. The study provides preliminary support for inclusion of Middle Path in the skills training component of DBT with adolescents and their caregivers. Clinical implications of responses and the role of validation in improving family functioning are discussed. PMID:26160621

  14. 49 CFR 33.33 - Acceptance and rejection of rated orders.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... received on the same day, the person must accept, based upon the earliest delivery dates, only those orders... forms of civil transportation: (1) A person shall not accept a rated order for delivery on a specific... earliest date on which delivery can be made and offer to accept the order on the basis of that...

  15. 49 CFR 33.33 - Acceptance and rejection of rated orders.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... received on the same day, the person must accept, based upon the earliest delivery dates, only those orders... forms of civil transportation: (1) A person shall not accept a rated order for delivery on a specific... earliest date on which delivery can be made and offer to accept the order on the basis of that...

  16. 49 CFR 33.33 - Acceptance and rejection of rated orders.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... received on the same day, the person must accept, based upon the earliest delivery dates, only those orders... forms of civil transportation: (1) A person shall not accept a rated order for delivery on a specific... earliest date on which delivery can be made and offer to accept the order on the basis of that...

  17. Automatically generated acceptance test: A software reliability experiment

    NASA Technical Reports Server (NTRS)

    Protzel, Peter W.

    1988-01-01

    This study presents results of a software reliability experiment investigating the feasibility of a new error detection method. The method can be used as an acceptance test and is solely based on empirical data about the behavior of internal states of a program. The experimental design uses the existing environment of a multi-version experiment previously conducted at the NASA Langley Research Center, in which the launch interceptor problem is used as a model. This allows the controlled experimental investigation of versions with well-known single and multiple faults, and the availability of an oracle permits the determination of the error detection performance of the test. Fault interaction phenomena are observed that have an amplifying effect on the number of error occurrences. Preliminary results indicate that all faults examined so far are detected by the acceptance test. This shows promise for further investigations, and for the employment of this test method on other applications.

  18. Acceptability of reactors in space

    SciTech Connect

    Buden, D.

    1981-04-01

    Reactors are the key to our future expansion into space. However, there has been some confusion in the public as to whether they are a safe and acceptable technology for use in space. The answer to these questions is explored. The US position is that when reactors are the preferred technical choice, that they can be used safely. In fact, it dies not appear that reactors add measurably to the risk associated with the Space Transportation System.

  19. Acceptability of reactors in space

    SciTech Connect

    Buden, D.

    1981-01-01

    Reactors are the key to our future expansion into space. However, there has been some confusion in the public as to whether they are a safe and acceptable technology for use in space. The answer to these questions is explored. The US position is that when reactors are the preferred technical choice, that they can be used safely. In fact, it does not appear that reactors add measurably to the risk associated with the Space Transportation System.

  20. Reactor tank UT acceptance criteria

    SciTech Connect

    Daugherty, W.L.

    1990-01-30

    The SRS reactor tanks are constructed of type 304 stainless steel, with 0.5 inch thick walls. An ultrasonic (UT) in-service inspection program has been developed for examination of these tanks, in accordance with the ISI Plan for the Savannah River Production Reactors Process Water System (DPSTM-88-100-1). Prior to initiation of these inspections, criteria for the disposition of any indications that might be found are required. A working group has been formed to review available information on the SRS reactor tanks and develop acceptance criteria. This working group includes nationally recognized experts in the nuclear industry. The working group has met three times and produced three documents describing the proposed acceptance criteria, the technical basis for the criteria and a proposed initial sampling plan. This report transmits these three documents, which were prepared in accordance with the technical task plan and quality assurance plan for this task, task 88-001-A- 1. In addition, this report summarizes the acceptance criteria and proposed sampling plan, and provides further interpretation of the intent of these three documents where necessary.

  1. 12 CFR 7.1007 - Acceptances.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 1 2010-01-01 2010-01-01 false Acceptances. 7.1007 Section 7.1007 Banks and... § 7.1007 Acceptances. A national bank is not limited in the character of acceptances it may make in financing credit transactions. Bankers' acceptances may be used for such purpose, since the making...

  2. 12 CFR 7.1007 - Acceptances.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 1 2011-01-01 2011-01-01 false Acceptances. 7.1007 Section 7.1007 Banks and... § 7.1007 Acceptances. A national bank is not limited in the character of acceptances it may make in financing credit transactions. Bankers' acceptances may be used for such purpose, since the making...

  3. 21 CFR 820.86 - Acceptance status.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Acceptance status. 820.86 Section 820.86 Food and... QUALITY SYSTEM REGULATION Acceptance Activities § 820.86 Acceptance status. Each manufacturer shall identify by suitable means the acceptance status of product, to indicate the conformance or...

  4. 12 CFR 615.5550 - Bankers' acceptances.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 6 2011-01-01 2011-01-01 false Bankers' acceptances. 615.5550 Section 615.5550... POLICIES AND OPERATIONS, AND FUNDING OPERATIONS Bankers' Acceptances § 615.5550 Bankers' acceptances. Banks for cooperatives may rediscount with other purchasers the acceptances they have created. The bank...

  5. 48 CFR 245.606-3 - Acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Acceptance. 245.606-3... Contractor Inventory 245.606-3 Acceptance. (a) If the schedules are acceptable, the plant clearance officer shall, within 15 days, complete and send the contractor a DD Form 1637, Notice of Acceptance...

  6. 48 CFR 12.402 - Acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Acceptance. 12.402 Section... Acceptance. (a) The acceptance paragraph in 52.212-4 is based upon the assumption that the Government will rely on the contractor's assurances that the commercial item tendered for acceptance conforms to...

  7. 21 CFR 820.86 - Acceptance status.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 8 2011-04-01 2011-04-01 false Acceptance status. 820.86 Section 820.86 Food and... QUALITY SYSTEM REGULATION Acceptance Activities § 820.86 Acceptance status. Each manufacturer shall identify by suitable means the acceptance status of product, to indicate the conformance or...

  8. 12 CFR 615.5550 - Bankers' acceptances.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Bankers' acceptances. 615.5550 Section 615.5550... POLICIES AND OPERATIONS, AND FUNDING OPERATIONS Bankers' Acceptances § 615.5550 Bankers' acceptances. Banks for cooperatives may rediscount with other purchasers the acceptances they have created. The bank...

  9. 48 CFR 12.402 - Acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Acceptance. 12.402 Section... Acceptance. (a) The acceptance paragraph in 52.212-4 is based upon the assumption that the Government will rely on the contractor's assurances that the commercial item tendered for acceptance conforms to...

  10. Relationship between colorimetric (instrumental) evaluation and consumer-defined beef colour acceptability.

    PubMed

    Holman, Benjamin W B; Mao, Yanwei; Coombs, Cassius E O; van de Ven, Remy J; Hopkins, David L

    2016-11-01

    The relationship between instrumental colorimetric values (L*, a*, b*, the ratio of reflectance at 630nm and 580nm) and consumer perception of acceptable beef colour was evaluated using a web-based survey and standardised photographs of beef m. longissimus lumborum with known colorimetrics. Only L* and b* were found to relate to average consumer opinions of beef colour acceptability. Respondent nationality was also identified as a source of variation in beef colour acceptability score. Although this is a preliminary study with the findings necessitating additional investigation, these results suggest L* and b* as candidates for developing instrumental thresholds for consumer beef colour expectations. PMID:27294520

  11. Anticipating Potential Waste Acceptance Criteria for Defense Spent Nuclear Fuel

    SciTech Connect

    Rechard, R.P.; Lord, M.E.; Stockman, C.T.; McCurley, R.D.

    1997-12-31

    The Office of Environmental Management of the U.S. Department of Energy is responsible for the safe management and disposal of DOE owned defense spent nuclear fuel and high level waste (DSNF/DHLW). A desirable option, direct disposal of the waste in the potential repository at Yucca Mountain, depends on the final waste acceptance criteria, which will be set by DOE`s Office of Civilian Radioactive Waste Management (OCRWM). However, evolving regulations make it difficult to determine what the final acceptance criteria will be. A method of anticipating waste acceptance criteria is to gain an understanding of the DOE owned waste types and their behavior in a disposal system through a performance assessment and contrast such behavior with characteristics of commercial spent fuel. Preliminary results from such an analysis indicate that releases of 99Tc and 237Np from commercial spent fuel exceed those of the DSNF/DHLW; thus, if commercial spent fuel can meet the waste acceptance criteria, then DSNF can also meet the criteria. In large part, these results are caused by the small percentage of total activity of the DSNF in the repository (1.5%) and regulatory mass (4%), and also because commercial fuel cladding was assumed to provide no protection.

  12. 10 CFR 960.3-2-2-1 - Evaluation of all potentially acceptable sites.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Evaluation of all potentially acceptable sites. 960.3-2-2-1 Section 960.3-2-2-1 Energy DEPARTMENT OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Implementation Guidelines § 960.3-2-2-1...

  13. 10 CFR 960.3-1-4-1 - Site identification as potentially acceptable.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Site identification as potentially acceptable. 960.3-1-4-1 Section 960.3-1-4-1 Energy DEPARTMENT OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Implementation Guidelines § 960.3-1-4-1 Site...

  14. 10 CFR 960.3-2-2-1 - Evaluation of all potentially acceptable sites.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Evaluation of all potentially acceptable sites. 960.3-2-2-1 Section 960.3-2-2-1 Energy DEPARTMENT OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Implementation Guidelines § 960.3-2-2-1...

  15. 78 FR 7768 - Public Service Company of Colorado; Notice of Application Accepted for Filing, Soliciting Motions...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-04

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Public Service Company of Colorado; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Preliminary...

  16. 10 CFR 960.3-2-1 - Site screening for potentially acceptable sites.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Site screening for potentially acceptable sites. 960.3-2-1 Section 960.3-2-1 Energy DEPARTMENT OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Implementation Guidelines § 960.3-2-1 Site screening...

  17. An Exploration of the Relationship between Organizational Culture Types and Technology Acceptance in Higher Education

    ERIC Educational Resources Information Center

    Davies, Lawrence Bennett

    2010-01-01

    This research project was done as a preliminary investigation to find the relationship between organizational culture types and technology acceptance in an institution of higher education. Thirty-nine respondents out of a single population of 443 eligible participants returned usable data. Using an online survey, subjects responded to a series…

  18. 10 CFR 960.3-2-2-1 - Evaluation of all potentially acceptable sites.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Evaluation of all potentially acceptable sites. 960.3-2-2-1 Section 960.3-2-2-1 Energy DEPARTMENT OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Implementation Guidelines § 960.3-2-2-1...

  19. 10 CFR 960.3-2-2-1 - Evaluation of all potentially acceptable sites.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Evaluation of all potentially acceptable sites. 960.3-2-2-1 Section 960.3-2-2-1 Energy DEPARTMENT OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Implementation Guidelines § 960.3-2-2-1...

  20. 10 CFR 960.3-2-2-1 - Evaluation of all potentially acceptable sites.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Evaluation of all potentially acceptable sites. 960.3-2-2-1 Section 960.3-2-2-1 Energy DEPARTMENT OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Implementation Guidelines § 960.3-2-2-1...