Science.gov

Sample records for acceptance test program

  1. Startup of the FFTF sodium cooled reactor. [Acceptance Test Program

    SciTech Connect

    Redekopp, R.D.; Umek, A.M.

    1981-03-01

    The Fast Flux Test Facility (FFTF), located on the Department of Energy (DOE) Hanford Reservation near Richland, Washington, is a 3 Loop 400 MW(t) sodium cooled fast reactor with a primary mission to test fuels and materials for development of the Liquid Metal Fast Breeder Reactor (LMFBR). Bringing FFTF to a condition to accomplish this mission is the goal of the Acceptance Test Program (ATP). This program was the mechanism for achieving startup of the FFTF. Highlights of the ATP involving the system inerting, liquid metal and inerted cell testing and initial ascent to full power are discussed.

  2. ATLAS ACCEPTANCE TEST

    SciTech Connect

    J.C. COCHRANE; J.V. PARKER; ET AL

    2001-06-01

    The acceptance test program for Atlas, a 23 MJ pulsed power facility for use in the Los Alamos High Energy Density Hydrodynamics program, has been completed. Completion of this program officially releases Atlas from the construction phase and readies it for experiments. Details of the acceptance test program results and of machine capabilities for experiments will be presented.

  3. A FORTRAN IV Program for Multiple-choice Tests with Predetermined Minimal Acceptable Performance Levels

    ERIC Educational Resources Information Center

    Noe, Michael J.

    1976-01-01

    A Fortran IV multiple choice test scoring program for an IBM 370 computer is described that computes minimally acceptable performance levels and compares student scores to these levels. The program accomodates up to 500 items with no more than nine alternatives from a group of examinees numbering less than 10,000. (Author)

  4. Performance deterioration due to acceptance testing and flight loads; JT90 jet engine diagnostic program

    NASA Technical Reports Server (NTRS)

    Olsson, W. J.

    1982-01-01

    The results of a flight loads test of the JT9D-7 engine are presented. The goals of this test program were to: measure aerodynamic and inertia loads on the engine during flight, explore the effects of airplane gross weight and typical maneuvers on these flight loads, simultaneously measure the changes in engine running clearances and performance resulting from the maneuvers, make refinements of engine performance deterioration prediction models based on analytical results of the tests, and make recommendations to improve propulsion system performance retention. The test program included a typical production airplane acceptance test plus additional flights and maneuvers to encompass the range of flight loads in revenue service. The test results indicated that aerodynamic loads, primarily at take-off, were the major cause of rub-indicated that aerodynamic loads, primarily at take-off, were the major cause of rub-induced deterioration in the cold sectin of the engine. Differential thermal expansion between rotating and static parts plus aerodynamic loads combined to cause blade-to-seal rubs in the turbine.

  5. UGV acceptance testing

    NASA Astrophysics Data System (ADS)

    Kramer, Jeffrey A.; Murphy, Robin R.

    2006-05-01

    With over 100 models of unmanned vehicles now available for military and civilian safety, security or rescue applications, it is important to for agencies to establish acceptance testing. However, there appears to be no general guidelines for what constitutes a reasonable acceptance test. This paper describes i) a preliminary method for acceptance testing by a customer of the mechanical and electrical components of an unmanned ground vehicle system, ii) how it has been applied to a man-packable micro-robot, and iii) discusses the value of testing both to ensure that the customer has a workable system and to improve design. The test method automated the operation of the robot to repeatedly exercise all aspects and combinations of components on the robot for 6 hours. The acceptance testing process uncovered many failures consistent with those shown to occur in the field, showing that testing by the user does predict failures. The process also demonstrated that the testing by the manufacturer can provide important design data that can be used to identify, diagnose, and prevent long-term problems. Also, the structured testing environment showed that sensor systems can be used to predict errors and changes in performance, as well as uncovering unmodeled behavior in subsystems.

  6. Cone penetrometer acceptance test report

    SciTech Connect

    Boechler, G.N.

    1996-09-19

    This Acceptance Test Report (ATR) documents the results of acceptance test procedure WHC-SD-WM-ATR-151. Included in this report is a summary of the tests, the results and issues, the signature and sign- off ATP pages, and a summarized table of the specification vs. ATP section that satisfied the specification.

  7. L-286 Acceptance Test Record

    SciTech Connect

    HARMON, B.C.

    2000-01-14

    This document provides a detailed account of how the acceptance testing was conducted for Project L-286, ''200E Area Sanitary Water Plant Effluent Stream Reduction''. The testing of the L-286 instrumentation system was conducted under the direct supervision

  8. Acceptance Test Plan for ANSYS Software

    SciTech Connect

    CREA, B.A.

    2000-10-25

    This plan governs the acceptance testing of the ANSYS software (Full Mechanical Release 5.5) for use on Project Word Management Contract (PHMC) computer systems (either UNIX or Microsoft Windows/NT). There are two phases to the acceptance testing covered by this test plan: program execution in accordance with the guidance provided in installation manuals; and ensuring results of the execution are consistent with the expected physical behavior of the system being modeled.

  9. Nitrogen trailer acceptance test report

    SciTech Connect

    Kostelnik, A.J.

    1996-02-12

    This Acceptance Test Report documents compliance with the requirements of specification WHC-S-0249. The equipment was tested according to WHC-SD-WM-ATP-108 Rev.0. The equipment being tested is a portable contained nitrogen supply. The test was conducted at Norco`s facility.

  10. Voluntary STD testing and treatment program at a metropolitan correctional facility: evaluation of test acceptability and associated risk factors.

    PubMed

    Brown, Christopher K; Earley, Mary; Shaikh, Raees; Fickenscher, Jillian; Ott, Jessica; Person, Austin; Islam, K M Monirul; Simonsen, Kari; Sandkovsky, Uriel; Kaiser, Katherine Laux; Foxall, Mark; Margalit, Ruth

    2014-01-01

    Few studies have addressed challenges of diagnosis and treatment of sexually transmitted diseases (STDs) within correctional facilities. Initiatives that screen all inmates can be cost-prohibitive, while symptom-based screening undoubtedly fails to recognize significant numbers of asymptomatically infected persons. This study discusses a voluntary STD screening and treatment program developed at the Douglas County (Nebraska) Department of Corrections where student volunteers interviewed, screened, and educated 456 inmates. Inmate urine samples and interview responses about risk behaviors and motivators for participation in the screening program were analyzed. The results support the ongoing project method to screen and treat inmates in the community correctional facility. Risk factor analysis suggests that targeted testing and treatment efforts may have a role in providing cost-effective care for STD among the incarcerated population. PMID:24352406

  11. NEVADA TEST SITE WASTE ACCEPTANCE CRITERIA

    SciTech Connect

    U.S. DEPARTMENT OF ENERGY, NATIONAL NUCLEAR SECURITY ADMINISTRATION, NEVADA SITE OFFICE

    2005-07-01

    This document establishes the U. S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) waste acceptance criteria (WAC). The WAC provides the requirements, terms, and conditions under which the Nevada Test Site will accept low-level radioactive and mixed waste for disposal. Mixed waste generated within the State of Nevada by NNSA/NSO activities is accepted for disposal. It includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the Nevada Test Site Area 3 and Area 5 Radioactive Waste Management Site for storage or disposal.

  12. From requirements to acceptance tests

    NASA Technical Reports Server (NTRS)

    Baize, Lionel; Pasquier, Helene

    1993-01-01

    From user requirements definition to accepted software system, the software project management wants to be sure that the system will meet the requirements. For the development of a telecommunication satellites Control Centre, C.N.E.S. has used new rules to make the use of tracing matrix easier. From Requirements to Acceptance Tests, each item of a document must have an identifier. A unique matrix traces the system and allows the tracking of the consequences of a change in the requirements. A tool has been developed, to import documents into a relational data base. Each record of the data base corresponds to an item of a document, the access key is the item identifier. Tracing matrix is also processed, providing automatically links between the different documents. It enables the reading on the same screen of traced items. For example one can read simultaneously the User Requirements items, the corresponding Software Requirements items and the Acceptance Tests.

  13. Payload test philosophy. [JPL views on qualification/acceptance testing

    NASA Technical Reports Server (NTRS)

    Gindorf, T.

    1979-01-01

    The general philosophy of how JPL views payload qualification/acceptance testing for programs that are done either in-house or by contractors is described. Particular attention is given to mission risk classifications, preliminary critical design reviews, environmental design requirements, the thermal and dynamics development tests, and the flight spacecraft system test.

  14. Nevada Test Site Waste Acceptance Criteria

    SciTech Connect

    U. S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2005-10-01

    This document establishes the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) waste acceptance criteria (WAC). The WAC provides the requirements, terms, and conditions under which the Nevada Test Site (NTS) will accept low-level radioactive (LLW) and mixed waste (MW) for disposal. It includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the NTS Area 3 and Area 5 Radioactive Waste Management Complex (RWMC) for storage or disposal.

  15. Breathing air trailer acceptance test procedure

    SciTech Connect

    Kostelnik, A.J.

    1994-09-14

    This Acceptance Test Procedure (ATP) will document compliance with the requirements of WHC-S-0251 Rev. 0 and ECNs 613530 and 606113. The equipment being tested is a Breathing Air Supply Trailer purchased as a Design and Fabrication procurement activity for use in the core sampling program. The ATP was written by the Seller and will be performed by the Seller with representatives of the Westinghouse Hanford Company witnessing the test at the Seller`s location. This test procedure is to verify that the American Bristol Industries, Inc., Model 5014-0001 low pressure Mobile Breathing Air Trailer, meets or exceeds the requirements of the Westinghouse Hanford specification.

  16. Iterative Evaluation in a Mobile Counseling and Testing Program to Reach People of Color at Risk for HIV--New Strategies Improve Program Acceptability, Effectiveness, and Evaluation Capabilities

    ERIC Educational Resources Information Center

    Spielberg, Freya; Kurth, Ann; Reidy, William; McKnight, Teka; Dikobe, Wame; Wilson, Charles

    2011-01-01

    This article highlights findings from an evaluation that explored the impact of mobile versus clinic-based testing, rapid versus central-lab based testing, incentives for testing, and the use of a computer counseling program to guide counseling and automate evaluation in a mobile program reaching people of color at risk for HIV. The program's…

  17. Pegasus test program

    NASA Astrophysics Data System (ADS)

    Irvine, Tom; Bumpas, Kerry

    The Pegasus testing program is briefly reviewed with emphasis on the environmental testing performed on the avionics components. In particular, attention is given to the pyrotechnic shock, shock qualification testing, random vibration thermal testing, anomalies during qualification testing, and acceptance test results. The discussion also covers flight results and a preview of the Taurus, the ground launched version of the Pegasus.

  18. Nevada Test Site Waste Acceptance Criteria, December 2000

    SciTech Connect

    2000-12-01

    This document establishes the US Department of Energy, Nevada Operations Office waste acceptance criteria. The waste acceptance criteria provides the requirements, terms, and conditions under which the Nevada Test Site will accept low-level radioactive waste and mixed waste for disposal. It includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the Nevada Test Site Area 3 and Area 5 Radioactive Waste Management Sites for storage or disposal.

  19. Evaluation program for secondary spacecraft cells: Acceptance tests of Eagle-Picher 12.0 ampere-hour nickel-cadmium cells with auxiliary electrodes

    NASA Technical Reports Server (NTRS)

    Christy, D. E.

    1971-01-01

    An acceptance test program was conducted on 24 cells to insure that all cells put into the life cycle program were of high quality by the removal of cells found to have electrolyte leakage, internal shorts, low capacity, or inability of any cell to recover its open circuit voltage above 1.150 volts after the cell short test. The cells were rated at 12.0 ampere-hours and equipped with auxiliary electrodes. Test results were: (1) The capacity of the 24 cells ranged from 14.6 to 16.8 ah. All the cells exceeded the rated capacity on all three capacity checks. (2) One cell failed to recover to 1.150 volts after the cell short test. (3) During the overcharge tests, all cells but one failed the test at the c/10 rate after the first minute. (4) A special resistance test was conducted on the auxiliary electrodes of these cells to establish the resistance value necessary which would provide maximum signal power across the auxiliary electrode. The resistance value established was 10 ohms. (5) No electrolyte leakage was observed.

  20. Nevada Test Site Waste Acceptance Criteria (NTSWAC)

    SciTech Connect

    NNSA /NSO Waste Management Project

    2008-06-01

    This document establishes the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, Nevada Test Site Waste Acceptance Criteria (NTSWAC). The NTSWAC provides the requirements, terms, and conditions under which the Nevada Test Site will accept low-level radioactive (LLW) and LLW Mixed Waste (MW) for disposal.

  1. Acceptance test procedure MICON software exhaust fan control modifications

    SciTech Connect

    SILVAN, G.R.

    1999-05-21

    This acceptance test verifies the MICON program changes for the new automatic transfer switch ATS-2 alarms, the Closed Loop Cooling isolator status, the CB-3 position alarm, and the alarms for the new emergency fan damper backup air compressor.

  2. Nevada Test Site Waste Acceptance Criteria

    SciTech Connect

    U.S. Department of Energy, Nevada Operations Office, Waste Acceptance Criteria

    1999-05-01

    This document provides the requirements, terms, and conditions under which the Nevada Test Site will accept low-level radioactive and mixed waste for disposal; and transuranic and transuranic mixed waste for interim storage at the Nevada Test Site.

  3. Nitrogen chiller acceptance test procedure

    SciTech Connect

    Kostelnik, A.J.

    1995-03-07

    This document includes the inspection and testing requirements for the Nitrogen Chiller unit. The Chiller will support the Rotary Mode core Sampling System during the summer. The Chiller cools the Nitrogen Purge Gas that is used when drilling in tank wastes to cool the drill bit.

  4. Accepted Peer Practices in Adventure Programming.

    ERIC Educational Resources Information Center

    Johanson, Karl M., Comp.

    For the purpose of raising the level of safety, encouraging educational institutions and training programs to develop leaders, providing information for programs, establishing a base for communication with land use agencies, and providing information for school and agency custodians of potential students, the manual outlines "Accepted Peer…

  5. Generator acceptance test and inspection report

    SciTech Connect

    Johns, B.R.

    1997-07-24

    This Acceptance Test Report(ATR) is the completed testing and inspection of the new portable generator. The testing and inspection is to verify that the generator provided by the vendor meets the requirements of specification WHC-S-0252, Revision 2. Attached is various other documentation to support the inspection and testing.

  6. Gas characterization system software acceptance test report

    SciTech Connect

    Vo, C.V.

    1996-03-28

    This document details the results of software acceptance testing of gas characterization systems. The gas characterization systems will be used to monitor the vapor spaces of waste tanks known to contain measurable concentrations of flammable gases.

  7. Gas characterization system software acceptance test procedure

    SciTech Connect

    Vo, C.V.

    1996-02-27

    This document details the Software Acceptance Testing of gas characterization systems. The gas characterization systems will be used to monitor the vapor spaces of waste tanks known to contain measurable concentrations of flammable gases.

  8. THE ENVIRONMENTAL TECHNOLOGIES ACCEPTANCE (ETA) PROGRAM

    SciTech Connect

    Christina B. Behr-Andres

    2001-04-01

    The Environmental Technologies Acceptance (ETA) Program at the Energy and Environmental Research Center (EERC) is intended to advance the development, commercial acceptance, and timely deployment of selected private sector technologies for the cleanup of sites in the nuclear defense complex as well as the greater market. As shown in Table 1, this cooperative agreement funded by the National Energy Technology Laboratory (NETL) consists of three tasks: Technology Selection, Technology Development, and Technology Verification. As currently conceived, the ETA will address the needs of as many technologies as appropriate under its current 3-year term. This report covers activities during the first 6 months of the 3-year ETA program.

  9. Breathing air trailer acceptance test report

    SciTech Connect

    Kostelnik, A.J.

    1996-02-12

    This Acceptance Test Report documents compliance with the requirements of specification WHC-S-0251, Rev.0 and ECNs 613530 and 606113. The equipment was tested according to WHC-SD-WM-ATP-104. The equipment tested is a Breathing Air Supply Trailer purchased as a design and fabrication procurement activity. The ATP was written by the Seller and was performed by the Seller with representatives of the Westinghouse Hanford Company witnessing portions of the test at the Seller`s location.

  10. Induction graphitizing furnace acceptance test report

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The induction furnace was designed to provide the controlled temperature and environment required for the post-cure, carbonization and graphitization processes for the fabrication of a fibrous graphite NERVA nozzle extension. The acceptance testing required six tests and a total operating time of 298 hrs. Low temperature mode operations, 120 to 850 C, were completed in one test run. High temperature mode operations, 120 to 2750 C, were completed during five tests.

  11. Void fraction instrument acceptance test procedure

    SciTech Connect

    Pearce, K.L.

    1994-09-15

    This acceptance test procedure (ATP) was written to test the void fraction instrument (VFI) and verify that the unit is ready for field service. The procedure verifies that the mechanical and electrical features (not specifically addressed in the software ATP) and software alarms are operating as designed.

  12. W-087 Acceptance test procedure. Revision 1

    SciTech Connect

    Joshi, A.W.

    1997-06-10

    This Acceptance Test Procedure/Operational Test Procedure (ATP/OTP) has been prepared to demonstrate that the Electrical/Instrumentation and Mechanical systems function as required by project criteria and to verify proper operation of the integrated system including the interlocks.

  13. Acceptance test report: Backup power system

    SciTech Connect

    Cole, D.B.

    1996-01-26

    Acceptance Test Report for construction functional testing of Project W-030 Backup Power System. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. Backup power includes a single 125 KW diesel generator, three 10-kva uninterruptible power supply units, and all necessary control.

  14. Acceptance test report 2721-Z upgrades

    SciTech Connect

    Keck, R.D.

    1998-02-03

    This test procedure provides instructions for acceptance testing of modifications to the 2721-Z diesel-generator system made by Project C-189. The modifications include (1) replacing the generator NUMA-LOGIC controller with connection to the PFP distributed control system (DCS), (2) replacing ATSI with a breaker switching scheme for 2736-ZB backup power and (3) providing a method for generator load and system testing.

  15. Electromagnetic induction moisture measurement system acceptance test plan

    SciTech Connect

    Vargo, G.F., Westinghouse Hanford

    1996-08-01

    The purpose of this acceptance test plan (ATP) is to verify that the mechanical, electrical and software features of the ElectroMagnetic Induction (EMI) probe are operating as designed,and that the unit is ready for field service. The accepted EMI and Surface Moisture Measurement Systems (SMMS) will be used primarily in support of Tank Waste Remediation System (TWRS) Safety Programs for moisture measurement of organic and ferrocyanide watch list tanks.

  16. Retained gas sampler system acceptance test report

    SciTech Connect

    Cannon, N.S., Westinghouse Hanford

    1996-07-18

    Acceptance test results for the Retained Gas Sampler System (RGSS) obtained in the 306E laboratory are reported. The RGSS will be utilized to retrieve and analyze samples from the Hanford flammable gas watch-list tanks to determine the quantity and chemistry of gases confined within the waste.

  17. Emperical Tests of Acceptance Sampling Plans

    NASA Technical Reports Server (NTRS)

    White, K. Preston, Jr.; Johnson, Kenneth L.

    2012-01-01

    Acceptance sampling is a quality control procedure applied as an alternative to 100% inspection. A random sample of items is drawn from a lot to determine the fraction of items which have a required quality characteristic. Both the number of items to be inspected and the criterion for determining conformance of the lot to the requirement are given by an appropriate sampling plan with specified risks of Type I and Type II sampling errors. In this paper, we present the results of empirical tests of the accuracy of selected sampling plans reported in the literature. These plans are for measureable quality characteristics which are known have either binomial, exponential, normal, gamma, Weibull, inverse Gaussian, or Poisson distributions. In the main, results support the accepted wisdom that variables acceptance plans are superior to attributes (binomial) acceptance plans, in the sense that these provide comparable protection against risks at reduced sampling cost. For the Gaussian and Weibull plans, however, there are ranges of the shape parameters for which the required sample sizes are in fact larger than the corresponding attributes plans, dramatically so for instances of large skew. Tests further confirm that the published inverse-Gaussian (IG) plan is flawed, as reported by White and Johnson (2011).

  18. W-026, acceptance test report manipulator system

    SciTech Connect

    Watson, T.L.

    1997-04-15

    The purpose of the WRAP Manipulator System Acceptance Test Plan (ATP) is to verify that the 4 glovebox sets of WRAP manipulator components, including rail/carriage, slave arm, master controller and auxiliary equipment, meets the requirements of the functional segments of 14590 specification. The demonstration of performance elements of the ATP are performed as a part of the Assembly specifications. Manipulator integration is integrated in the performance testing of the gloveboxes. Each requirement of the Assembly specification will be carried out in conjunction with glovebox performance tests.

  19. Acceptance test report MICON software exhaust fan control modifications

    SciTech Connect

    SILVAN, G.R.

    1999-05-20

    This report documents the results the acceptance test HNF-4108 which verifies the MICON program changes for the new automatic transfer switch ATS-2 alarms, the Closed Loop Cooling isolator status, the CB-3 position alarm, the alarms for the new emergency fan damper backup air compressor, and the generator sequencer logic.

  20. THE ENVIRONMENTAL TECHNOLOGIES ACCEPTANCE (ETA) PROGRAM

    SciTech Connect

    Christina B. Behr-Andres

    2001-10-01

    The objective of the Environmental Technologies Acceptance (ETA) Program at the Energy & Environmental Research Center (EERC) is to advance the development, commercial acceptance, and timely deployment of selected private sector technologies for the cleanup of sites in the nuclear defense complex as well as the greater market. As a result of contract changes approved by National Energy Technology Laboratory (NETL) representatives to incorporate activities previously conducted under another NETL agreement, there are now an additional task and an expansion of activities within the stated scope of work of the ETA program. As shown in Table 1, this cooperative agreement, funded by NETL (No. DE-FC26-00NT40840), consists of four tasks: Technology Selection, Technology Development, Technology Verification, and System Engineering. As currently conceived, ETA will address the needs of as many technologies as appropriate under its current 3-year term. There are currently four technical subtasks: Long-Term Stewardship Initiative at the Mound Plant Site; Photocatalysis of Mercury-Contaminated Water; Subcritical Water Treatment of PCB and Metal-Contaminated Paint Waste; and Vegetative Covers for Low-Level Waste Repositories. This report covers activities during the second six months of the three-year ETA program.

  1. Site acceptance test, W-030 MICON system

    SciTech Connect

    Hill, L.F., Westinghouse Hanford

    1996-06-10

    Monitoring and control of the W-030 ventilation upgrade is provided by a distributed control system (DCS) furnished by MICON Corporation. After shipment to the Hanford Site, the site acceptance test (SAT) for this system was conducted in a laboratory environment over a six month period, involving four distinct phases and numerous hardware and software modifications required to correct test exceptions. The final results is a system which is not fully compliant with procurement specifications but is determined to meet minimum Project W-030 safety and functional requirements. A negotiated settlement was reached with the supplier to establish a `path forward` for system implementation. This report documents the `as-run` status of the SAT. The SAT was completed in August of 1995. It was later followed by comprehensive acceptance testing of the W-030 control-logic configuration software; results are documented in WHC-SD-W030-ATR-011. Further testing is reported as part of process system startup operational testing, performed after the MICON installation.

  2. A Web-Based Program to Increase Knowledge and Reduce Cigarette and Nargila Smoking Among Arab University Students in Israel: Mixed-Methods Study to Test Acceptability

    PubMed Central

    Linn, Shai; Rafaeli, Sheizaf

    2015-01-01

    Background Among Arab citizens in Israel, cigarette and nargila (hookah, waterpipe) smoking is a serious public health problem, particularly among the young adult population. With the dramatic increase of Internet and computer use among Arab college and university students, a Web-based program may provide an easy, accessible tool to reduce smoking rates without heavy resource demands required by traditional methods. Objective The purpose of this research was to examine the acceptability and feasibility of a pilot Web-based program that provides tailored feedback to increase smoking knowledge and reduce cigarette and nargila smoking behaviors among Arab college/university students in Israel. Methods A pilot Web-based program was developed, consisting of a self-administered questionnaire and feedback system on cigarette and nargila smoking. Arab university students were recruited to participate in a mixed-methods study, using both quantitative (pre-/posttest study design) and qualitative tools. A posttest was implemented at 1 month following participation in the intervention to assess any changes in smoking knowledge and behaviors. Focus group sessions were implemented to assess acceptability and preferences related to the Web-based program. Results A total of 225 participants—response rate of 63.2% (225/356)—completed the intervention at baseline and at 1-month poststudy, and were used for the comparative analysis. Statistically significant reductions in nargila smoking among participants (P=.001) were found. The intervention did not result in reductions in cigarette smoking. However, the tailored Web intervention resulted in statistically significant increases in the intention to quit smoking (P=.021). No statistically significant increases in knowledge were seen at 1-month poststudy. Participants expressed high satisfaction with the intervention and 93.8% (211/225) of those who completed the intervention at both time intervals reported that they would

  3. Nevada test site waste acceptance criteria

    SciTech Connect

    1996-09-01

    This document provides the requirements, terms, and conditions under which the Nevada Test Site (NTS) will accept low-level radioactive and mixed waste for disposal; and transuranic and transuranic mixed waste for interim storage at the NTS. Review each section of this document. This document is not intended to include all of the requirements; rather, it is meant as a guide toward meeting the regulations. All references in this document should be observed to avoid omission of requirements on which acceptance or rejection of waste will be based. The Department of Energy/Nevada Operations Office (DOE/NV) and support contractors are available to assist you in understanding or interpreting this document.

  4. Acceptance testing prone stereotactic breast biopsy units.

    PubMed

    Kimme-Smith, C; Solberg, T

    1994-07-01

    When the Mammography Quality Standards Act becomes law in October, 1994, stereotactic breast biopsy units may require yearly physicist calibration. Upright stereotactic units can be easily tested using conventional mammography procedures and a gelatin phantom containing simulated calcifications, but prone units are difficult to assess because of the under-table tube configuration. The two current manufacturers of these units have made different design decisions which affect each unit's calibration. There are a number of important distinctions between screening and prone biopsy units. For the two currently available prone units, a pronounced heel effect makes ion chamber position critical. Focal spot measurements are particularly difficult on one unit because there is no light field. The fixed grid on the other unit must be tested with a flood film. Physicists who inspect these units before their clinical use should be aware of variations needed by this equipment for specific acceptance tests. PMID:7968854

  5. NEVADA TEST SITE WASTE ACCEPTANCE CRITERIA, JUNE 2006

    SciTech Connect

    U.S. DEPARTMENT OF ENERGY, NATIONAL NUCLEAR SECURITY ADMINISTRATION NEVADA SITE OFFICE

    2006-06-01

    This document establishes the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) waste acceptance criteria (WAC). The WAC provides the requirements, terms, and conditions under which the Nevada Test Site (NTS) will accept low-level radioactive (LLW) and mixed waste (MW) for disposal. It includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the NTS Area 3 and Area 5 Radioactive Waste Management Complex (RWMC) for storage or disposal.

  6. Acceptance Test Report for 241-U compressed air system

    SciTech Connect

    Freeman, R.D.

    1994-10-20

    This Acceptance Test Report (ATR) documents the results of acceptance testing of a newly upgraded compressed air system at 241-U Farm. The system was installed and the test successfully performed under work package 2W-92-01027.

  7. Automatically generated acceptance test: A software reliability experiment

    NASA Technical Reports Server (NTRS)

    Protzel, Peter W.

    1988-01-01

    This study presents results of a software reliability experiment investigating the feasibility of a new error detection method. The method can be used as an acceptance test and is solely based on empirical data about the behavior of internal states of a program. The experimental design uses the existing environment of a multi-version experiment previously conducted at the NASA Langley Research Center, in which the launch interceptor problem is used as a model. This allows the controlled experimental investigation of versions with well-known single and multiple faults, and the availability of an oracle permits the determination of the error detection performance of the test. Fault interaction phenomena are observed that have an amplifying effect on the number of error occurrences. Preliminary results indicate that all faults examined so far are detected by the acceptance test. This shows promise for further investigations, and for the employment of this test method on other applications.

  8. Nurse educators' acceptance of the computer in baccalaureate nursing programs.

    PubMed

    Delaney, C W

    1989-01-01

    Although several studies have investigated nurse educators' perceived knowledge of and acceptance of computer technology, none have incorporated objective indicators of knowledge or acceptance. This descriptive research study used standardized and investigator-developed tests to examine acceptance of the computer by randomly selected administrators and faculty in private baccalaureate nursing programs. Levels of computer literacy and attitudes were sufficiently positive to promote the awareness, interest, and evaluation stages of Roger's diffusion and adoption model. Responses were not sufficiently positive to promote the trial and adoption of computer technology for instructional and administrative activities. Recommended approaches to meeting this challenge included instruction related to computer software and educational applications and the use of consortial arrangements to share knowledge, computer hardware and software, and application experiences. PMID:2659152

  9. Surface moisture measurement system hardware acceptance test report

    SciTech Connect

    Ritter, G.A., Westinghouse Hanford

    1996-05-28

    This document summarizes the results of the hardware acceptance test for the Surface Moisture Measurement System (SMMS). This test verified that the mechanical and electrical features of the SMMS functioned as designed and that the unit is ready for field service. The bulk of hardware testing was performed at the 306E Facility in the 300 Area and the Fuels and Materials Examination Facility in the 400 Area. The SMMS was developed primarily in support of Tank Waste Remediation System (TWRS) Safety Programs for moisture measurement in organic and ferrocyanide watch list tanks.

  10. Acceptability and preliminary efficacy of a tailored online HIV/STI testing intervention for young men who have sex with men: the Get Connected! program.

    PubMed

    Bauermeister, José A; Pingel, Emily S; Jadwin-Cakmak, Laura; Harper, Gary W; Horvath, Keith; Weiss, Gretchen; Dittus, Patricia

    2015-10-01

    Southeast Michigan accounts for over 70 % of all HIV/STI cases in the state, with young men who have sex with men (YMSM) between the ages of 13 and 24 encumbering the largest burden in HIV/STI incidence. Using community-based participatory research principles, we developed and pilot tested a web-based, randomized control trial seeking to promote HIV/STI testing ("Get Connected!") among YMSM (N = 130; ages 15-24). Randomized participants completed a baseline assessment and shown a test-locator condition (control) or a tailored, personalized site (treatment). At 30-day follow-up, we found high acceptability among YMSM in both conditions, yet higher credibility of intervention content among YMSM in the treatment group (d = .55). Furthermore, 30 participants reported testing by following, with the majority of these participants (73.3 %; n = 22) completing the treatment condition, a clinically meaningful effect (d = .34) suggesting preliminary efficacy for the intervention. These results demonstrate the potential of the intervention, and suggest that a larger efficacy trial may be warranted. PMID:25638038

  11. 46 CFR 164.023-11 - Acceptance tests.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Acceptance tests. 164.023-11 Section 164.023-11 Shipping...: SPECIFICATIONS AND APPROVAL MATERIALS Thread for Personal Flotation Devices § 164.023-11 Acceptance tests. (a... submitted for acceptance. (b) Identification testing. Manufacturers shall ensure that the...

  12. 46 CFR 164.023-11 - Acceptance tests.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 6 2011-10-01 2011-10-01 false Acceptance tests. 164.023-11 Section 164.023-11 Shipping...: SPECIFICATIONS AND APPROVAL MATERIALS Thread for Personal Flotation Devices § 164.023-11 Acceptance tests. (a... submitted for acceptance. (b) Identification testing. Manufacturers shall ensure that the...

  13. Acceptance test procedure for shuttle actuators simulator (elevon subsystem)

    NASA Technical Reports Server (NTRS)

    Barr, J.

    1976-01-01

    The acceptance test procedure is described for the Lockheed Electronics Elevon Servoactuator Simulator to be used in the Shuttle Avionics Integration Laboratory (SAIL). The intent of this acceptance test procedure is to comply with the technical Shuttle Actuators Simulator Requirements. Acceptance tests will be performed on each Elevon Servoactuator Simulator.

  14. Evaluation program for secondary spacecraft cells: Acceptance test of Eagle-Picher 100 ampere-hour nickel-cadmium cells with auxiliary electrodes

    NASA Technical Reports Server (NTRS)

    Christy, D. E.

    1972-01-01

    Tests were conducted on a group of 29 cells for the purpose of removing from the life cycle program all cells found to have electrolyte leakage, internal shorts, low capacity, or inability to recover open circuit voltage above 1.150 volts after the cell short test. The test findings include the following: (1) All the cells exceeded the rated capacity of 103.5 to 119.0 ampere-hours on all three capacity checks. (2) All cells recovered above the 1.150 volt requirement after the cell short test. (3) The cells cannot be overcharged at the c/10 rate without exceeding 1.500 volts after approximately 12 to 13 hours of charge. (4) The resistance value necessary to provide maximum signal power across the auxiliary electrode was found to be 10 ohms. (5) One cell revealed a definite leak at the negative terminal.

  15. Development of an acceptance test for solar energy systems

    NASA Astrophysics Data System (ADS)

    Joncich, D. M.; Johnson, D. L.

    1981-06-01

    This report describes the development and field evaluation of a short-duration procedure and an instrumentation package for testing whether a newly installed solar energy system is performing to design specifications. The U.S. Army Construction Engineering Research Laboratory: (1) defined a general solar system schematic and identified its major components; (2) developed test procedures for determining the thermal performance of these components; (3) bought and programmed equipment to perform the prescribed component test and to produce the test data; (4) subjected the acceptance test concept and instrumentation package to a field evaluation at a newly installed Army solar energy system; and (5) incorporated the results of the field evaluation as modifications to the solar acceptance test. This report concludes that a simple, quantitative test of short duration can determine whether a newly installed solar system is operating as specified. The results of the research have revealed the potential for performing such a test with low-cost metering installed at the time of building construction.

  16. Proposed acceptance, qualification, and characterization tests for thin-film PV modules

    NASA Technical Reports Server (NTRS)

    Waddington, D.; Mrig, L.; Deblasio, R.; Ross, R.

    1988-01-01

    Details of a proposed test program for PV thin-film modules which the Department of Energy has directed the Solar Energy Research Institute (SERI) to prepare are presented. Results of one of the characterization tests that SERI has performed are also presented. The objective is to establish a common approach to testing modules that will be acceptable to both users and manufacturers. The tests include acceptance, qualification, and characterization tests. Acceptance tests verify that randomly selected modules have similar characteristics. Qualification tests are based on accelerated test methods designed to simulate adverse conditions. Characterization tests provide data on performance in a predefined environment.

  17. MCO Engineering Test Report Fuel Basket Handling Grapple Acceptance Test

    SciTech Connect

    CHENAULT, D.M.

    2000-01-06

    Acceptance testing of the production SNF Fuel Basket lift grapples to the required 150 percent maximum lift load is documented herein. The report shows the results affirming the proof test passage. The primary objective of this test was to confirm the load rating of the grapple per applicable requirements of ANSI 14 6 American National Standard For Radioactive Materials Special Lifting Devices for Shipping Containers Weighing 10,000 pounds (4500kg) or More. The above Standard requires a load test of 150% of the design load which must be held for a minimum of 10 minutes followed by a Liquid Penetrant or Magnetic Particle examination of critical areas and welds in accordance with the ANSI/ASME Boiler and Pressure Vessel Code 1989 Section 111 Division 1 section NF 5350.

  18. 46 CFR 164.023-11 - Acceptance tests.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 6 2014-10-01 2014-10-01 false Acceptance tests. 164.023-11 Section 164.023-11 Shipping...: SPECIFICATIONS AND APPROVAL MATERIALS Thread for Personal Flotation Devices § 164.023-11 Acceptance tests. (a) Performance testing. Manufacturers shall ensure that the performance tests described in § 164.023-7 (a) or...

  19. Apollo experience report: Certification test program

    NASA Technical Reports Server (NTRS)

    Levine, J. H.; Mccarty, B. J.

    1972-01-01

    A review of the Apollo spacecraft certification (qualification) test program is presented. The approach to devising the spectrum of dynamic and climatic environments, the formulation of test durations, and the relative significance of the formal certification test program compared with development testing and acceptance testing are reviewed. Management controls for the formulation of test requirements, test techniques, data review, and acceptance of test results are considered. Significant experience gained from the Apollo spacecraft certification test program which may be applicable to future manned spacecraft is presented.

  20. 46 CFR 164.013-5 - Acceptance tests.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 6 2014-10-01 2014-10-01 false Acceptance tests. 164.013-5 Section 164.013-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS...) § 164.013-5 Acceptance tests. Manufacturers shall ensure that the performance and identification...

  1. Acceptance test procedure for High Pressure Water Jet System

    SciTech Connect

    Crystal, J.B.

    1995-05-30

    The overall objective of the acceptance test is to demonstrate a combined system. This includes associated tools and equipment necessary to perform cleaning in the 105 K East Basin (KE) for achieving optimum reduction in the level of contamination/dose rate on canisters prior to removal from the KE Basin and subsequent packaging for disposal. Acceptance tests shall include necessary hardware to achieve acceptance of the cleaning phase of canisters. This acceptance test procedure will define the acceptance testing criteria of the high pressure water jet cleaning fixture. The focus of this procedure will be to provide guidelines and instructions to control, evaluate and document the acceptance testing for cleaning effectiveness and method(s) of removing the contaminated surface layer from the canister presently identified in KE Basin. Additionally, the desired result of the acceptance test will be to deliver to K Basins a thoroughly tested and proven system for underwater decontamination and dose reduction. This report discusses the acceptance test procedure for the High Pressure Water Jet.

  2. Acceptance Test Procedure for New Pumping Instrumentation & Control Skid V

    SciTech Connect

    KOCH, M.R.

    2000-08-14

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designated as ''V''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  3. Acceptability of Rapid Point-of-Care Hepatitis C Tests Among People Who Inject Drugs and Utilize Syringe-Exchange Programs

    PubMed Central

    Barocas, Joshua A.; Linas, Benjamin P.; Kim, Arthur Y.; Fangman, John; Westergaard, Ryan P.

    2016-01-01

    People who inject drugs may benefit from point-of-care hepatitis C virus (HCV) testing offered at syringe exchanges. We sought to understand whether this population would be willing to undergo rapid HCV testing. We found that there was broad support for rapid HCV testing, especially among younger people who inject drugs with high perceived risk. PMID:27191007

  4. Evaluation program for secondary spacecraft cells: Acceptance tests of Eagle-Picher 20.0 ampere-hour nickel-cadmium cells with auxiliary electrodes

    NASA Technical Reports Server (NTRS)

    Christy, D. E.

    1972-01-01

    A group of 29 cells with capacities ranging from 21.7 to 28.8 ampere-hours were tested. A summary of the results indicates: (1) All cells exceeded the rated capacity on all three capacity checks. (2) Five cells failed to recover to 1.150 volts. (3) During the overcharge tests, 15 of the 29 cells had to be removed from charge before completion of the respective tests due to high pressure.

  5. Operator coil monitoring Acceptance Test Procedure

    SciTech Connect

    Erhart, M.F.

    1995-05-16

    The readiness of the Data Acquisition and Control System (DACS) to provide monitoring and control of the Programmable Logic Controller (PLC) abort coils from the Master and RSS stations will be systematically tested during performance of this procedure. It should be noted that these are not physical abort coils but software coils controlled by the software`s ladder logic. The readiness of the DACS to properly interface with the ENRAF wire level gauge installed in the SY-101 storage tank will also be tested. During this test, a verification of all abort coil indications will be conducted at the DACS Development Facility in the 306E Building by injecting an input signal for each DACS sensor that has an associated abort coil until the abort coil actuates, and then ensuring that the status of the abort coil indicated at the Master and RSS stations is correct. Each abort coil will also be tested to ensure that the ``ENABLE`` and ``DISABLE`` controls from the Master and RSS stations function correctly, and only with the use of proper passwords.

  6. Operator coil monitoring acceptance test procedure

    SciTech Connect

    Erhart, M.F.

    1995-06-05

    The readiness of the Data Acquisition and Control System (DACS) to provide monitoring and control of the Programmable Logic Controller (PLC) abort coils from the Master and RSS stations will be systematically tested during performance of this procedure. It should be noted that these are not physical abort coils but software coils controlled by the software`s ladder logic. The readiness of the DACS to properly interface with the ENRAF wire level gauge installed in the SY101 storage tank will also be tested. During this test, a verification of all abort coil indications will be conducted at the DACS Development Facility in the 306E Building by injecting an input signal for each DACS sensor that has an associated abort coil until the abort coil actuates, and then ensuring that the status of the abort coil indicated at the Master and RSS stations correct. Each abort coil will also be tested to ensure that the ``ENABLE`` and ``DISABLE`` controls from the Master and RSS stations function correctly, and only with the use of proper passwords.

  7. Probabilistic Requirements (Partial) Verification Methods Best Practices Improvement. Variables Acceptance Sampling Calculators: Empirical Testing. Volume 2

    NASA Technical Reports Server (NTRS)

    Johnson, Kenneth L.; White, K. Preston, Jr.

    2012-01-01

    The NASA Engineering and Safety Center was requested to improve on the Best Practices document produced for the NESC assessment, Verification of Probabilistic Requirements for the Constellation Program, by giving a recommended procedure for using acceptance sampling by variables techniques as an alternative to the potentially resource-intensive acceptance sampling by attributes method given in the document. In this paper, the results of empirical tests intended to assess the accuracy of acceptance sampling plan calculators implemented for six variable distributions are presented.

  8. ASME PTC 46 -- Acceptance test code for overall plant performance

    SciTech Connect

    Friedman, J.R.; Yost, J.G.

    1999-11-01

    ASME published PTC 46 in 1996 after five years of development. PTC 46 is the first industry standard providing explicit procedures for conducting acceptance tests to determine the overall thermal performance and output of power generating units. It is applicable to any heat cycle power generating unit. This survey paper provides an overview of PTC 46 and discusses how PTC 46 can be used for acceptance testing of new combined cycle and fossil steam power generating units. Several technical papers have been previously presented that provide more detailed information and discussion on the use of PTC 46 in acceptance testing.

  9. Accepting Credit Responsibility: Teacher Guide. Family Financial Education Program 2.

    ERIC Educational Resources Information Center

    Continental Illinois National Bank and Trust Co., Chicago.

    The teacher's guide is for a high school unit on accepting credit responsibility, part of family financial education program which also includes a unit on managing personal income. The components of the unit, correlated with a planned instructional program in any area of economics, can be used to reinforce certain relationships and concepts which…

  10. Program for establishing long-time flight service performance of composite materials in the center wing structure of C-130 aircraft. Phase 4: Ground/flight acceptance tests

    NASA Technical Reports Server (NTRS)

    Harvill, W. E.; Kizer, J. A.

    1976-01-01

    The advantageous structural uses of advanced filamentary composites are demonstrated by design, fabrication, and test of three boron-epoxy reinforced C-130 center wing boxes. The advanced development work necessary to support detailed design of a composite reinforced C-130 center wing box was conducted. Activities included the development of a basis for structural design, selection and verification of materials and processes, manufacturing and tooling development, and fabrication and test of full-scale portions of the center wing box. Detailed design drawings, and necessary analytical structural substantiation including static strength, fatigue endurance, flutter, and weight analyses are considered. Some additional component testing was conducted to verify the design for panel buckling, and to evaluate specific local design areas. Development of the cool tool restraint concept was completed, and bonding capabilities were evaluated using full-length skin panel and stringer specimens.

  11. The Murmansk Initiative - RF: Acceptance Testing

    SciTech Connect

    Czajkowski, C.; Wester, D. W.; Dyer, R. S.; Soerlie, A. A.; Moller, B.; Barnes, E.

    2002-02-26

    The Murmansk Initiative-RF (MI) was conceived to provide the Russian Federation (RF) with the capacity to manage low-level liquid radioactive waste (LLRW) and comply with the requirements of the London Convention that prohibit ocean dumping. The trilateral project among Norway, the RF, and the United States of America (U.S.) began in 1994 and was the first to utilize exclusively Russian subcontractors to upgrade and expand an existing LLRW treatment plant on the premises of RTP Atomflot in Murmansk, Russia. The project moved quickly through the design phase. Progress during the construction phase was somewhat slower because of difficulties with acquisition of hardware, inexperience with automated instrumentation and control equipment, and unexpected design changes in the cementation unit. The project advanced into the test-operation phase, which is currently underway, in June 2001. Initial runs with liquid waste have revealed that procedures for unloading spent ion-exchange sorbents could be improved and that sludges formed during removal of alkaline-earth metals should be compacted in order for the facility to operate at its full potential. Resolution of these issues is expected within the next few months.

  12. Acceptance test procedure for Project W-049H

    SciTech Connect

    Buckles, D.I.

    1994-09-29

    The Acceptance Test Procedure (ATP) program for Project W-049H (200 Area Treated Effluent Disposal Facility [TEDF]) covers three activities as follows: (1) Disposal System; (2) Collection System; and (3) Instrumentation and Control System. Each activity has its own ATP. The purpose of the ATPs is to reverify that the systems have been constructed in accordance with the construction documents and to demonstrate that the systems function as required by the Project criteria. The Disposal System ATP covers the testing of the following: disposal line flowmeters, room air temperatures in the Disposal Station Sampling Building, effluent valves and position indicators, disposal pond level monitors, automated sampler, pressure relief valves, and overflow diversion sluice gates. The Collection System ATP covers the testing of the two pump stations and all equipment installed therein. The Instrumentation and Control (I and C) ATP covers the testing of the entire TEDF I and C system. This includes 3 OCS units, modem, and GPLI cabinets in the ETC control room; 2 pump stations; disposal station sampling building; and all LCUs installed in the field.

  13. Product acceptance environmental and destructive testing for reliability.

    SciTech Connect

    Dvorack, Michael A.; Kerschen, Thomas J.; Collins, Elmer W.

    2007-08-01

    To determine whether a component is meeting its reliability requirement during production, acceptance sampling is employed in which selected units coming off the production line are subjected to additional environmental and/or destructive tests that are within the normal environment space to which the component is expected to be exposed throughout its life in the Stockpile. This report describes what these tests are and how they are scored for reliability purposes. The roles of screens, Engineering Use Only tests, and next assembly product acceptance testing are also discussed, along with both the advantages and disadvantages of environmental and destructive testing.

  14. W-026, transuranic waste (TRU) glovebox acceptance test report

    SciTech Connect

    Leist, K.J.

    1998-03-11

    On July 18, 1997, the Transuranic (TRU) glovebox was tested using glovebox acceptance test procedure 13021A-86. The primary focus of the glovebox acceptance test was to examine control system interlocks, display menus, alarms, and operator messages. Limited mechanical testing involving the drum ports, hoists, drum lifter, compacted drum lifter, drum tipper, transfer car, conveyors, sorting table, lidder/delidder device and the TRU empty drum compactor were also conducted. As of February 25, 1998, 10 of the 102 test exceptions that affect the TRU glovebox remain open. These items will be tracked and closed via the WRAP Master Test Exception Database. As part of Test Exception resolution/closure the responsible individual closing the Test Exception performs a retest of the affected item(s) to ensure the identified deficiency is corrected, and, or to test items not previously available to support testing. Test exceptions are provided as appendices to this report.

  15. WRAP low level waste (LLW) glovebox acceptance test report

    SciTech Connect

    Leist, K.J.

    1998-02-17

    In June 28, 1997, the Low Level Waste (LLW) glovebox was tested using glovebox acceptance test procedure 13031A-85. The primary focus of the glovebox acceptance test was to examine control system interlocks, display menus, alarms, and operator messages. Limited mechanical testing involving the drum ports, hoists, drum lifter, compacted drum lifter, drum tipper, transfer car, conveyors, lidder/delidder device and the supercompactor were also conducted. As of November 24, 1997, 2 of the 131 test exceptions that affect the LLW glovebox remain open. These items will be tracked and closed via the WRAP Master Test Exception Database. As part of Test Exception resolution/closure the responsible individual closing the Test Exception performs a retest of the affected item(s) to ensure the identified deficiency is corrected, and, or to test items not previously available to support testing. Test Exceptions are provided as appendices to this report.

  16. Loss on Ignition Furnace Acceptance and Operability Test Procedure

    SciTech Connect

    JOHNSON, D.C.

    2000-06-01

    The purpose of this Acceptance Test Procedure and Operability Test Procedure (ATP/OTP)is to verify the operability of newly installed LOI equipment, including a model 1608FL CM{trademark} Furnace, a dessicator, and balance. The operability of the furnace will be verified. The arrangement of the equipment placed in Glovebox 157-3/4 to perform Loss on Ignition (LOI) testing on samples supplied from the Thermal Stabilization line will be verified. In addition to verifying proper operation of the furnace, this ATP/OTP will also verify the air flow through the filters, verify a damper setting to establish and maintain the required differential pressure between the glovebox and the room pressure, and test the integrity of the newly installed HEPA filter. In order to provide objective evidence of proper performance of the furnace, the furnace must heat 15 crucibles, mounted on a crucible rack, to 1000 C, according to a program entered into the furnace controller located outside the glovebox. The glovebox differential pressure will be set to provide the 0.5 to 2.0 inches of water (gauge) negative pressure inside the glovebox with an airflow of 100 to 125 cubic feet per minute (cfm) through the inlet filter. The glovebox inlet Glfilter will he flow tested to ensure the integrity of the filter connections and the efficiency of the filter medium. The newly installed windows and glovebox extension, as well as all disturbed joints, will be sonically tested via ultra probe to verify no leaks are present. The procedure for DOS testing of the filter is found in Appendix A.

  17. Loss on Ignition Furnace Acceptance and Operability Test Procedure

    SciTech Connect

    JOHNSTON, D.C.

    2000-08-23

    The purpose of this Acceptance Test Procedure and Operability Test Procedure (ATP/OTP)is to verify the operability of newly installed Loss on Ignition (LOI) equipment, including a model 1608FL CMTM Furnace, a dessicator, and balance. The operability of the furnace will be verified. The arrangement of the equipment placed in Glovebox 157-3/4 to perform LOI testing on samples supplied from the Thermal Stabilization line will be verified. In addition to verifying proper operation of the furnace, this ATP/OTP will also verify the air flow through the filters, verify a damper setting to establish and maintain the required differential pressure between the glovebox and the room pressure, and test the integrity of the newly installed HEPA filter. In order to provide objective evidence of proper performance of the furnace, the furnace must heat 15 crucibles, mounted on a crucible rack, to 1000 C, according to a program entered into the furnace controller located outside the glovebox. The glovebox differential pressure will be set to provide the 0.5 to 2.0 inches of water (gauge) negative pressure inside the glovebox with an expected airflow of 100 to 125 cubic feet per minute (cfm) through the inlet filter. The glovebox inlet G1 filter will be flow tested to ensure the integrity of the filter connections and the efficiency of the filter medium. The newly installed windows and glovebox extension, as well as all disturbed joints, will be sonically tested via ultra probe to verify no leaks are present. The procedure for DOS testing of the filter is found in Appendix A.

  18. PUREX SAMCONS uninterruptible power supply (UPS) acceptance test report

    SciTech Connect

    Blackaby, W.B.

    1997-10-07

    This Acceptance Test Report for the PUREX Surveillance and Monitoring and Control System (SAMCONS) Uninterruptible Power Supply (UPS) Acceptance Test Procedure validates the operation of the UPS, all alarming and display functions and the ability of the UPS to supply power to the SAMCONS as designed. The proper installation of the PUREX SAMCONS Trailer UPS components and wiring will be systematically evaluated by performance of this procedure. Proper operation of the SAMCONS computer UPS will be verified by performance of a timed functional load test, and verification of associated alarms and trouble indications. This test procedure will be performed in the SAMCONS Trailer and will include verification of receipt of alarms at the SAMCONS computer stations. This test may be performed at any time after the completion of HNF-SD-CP-ATP-083, PUREX Surveillance and Monitoring and Control System (SAMCONS) Acceptance Test Procedure, when computer display and alarm functions have been proven to operate correctly.

  19. Standard-B hydrogen monitoring system acceptance test report

    SciTech Connect

    Tran, T.T.

    1994-09-08

    Test Engineering was supported by Tank Waste Remediation System Safety Programs Engineering Support in the performance of an Acceptance Test Procedure (ATP) to qualify the Standard Hydrogen Monitoring System (SHMS) cabinet installed on waste tank 241-SY-103. The June 7, 1994 ATP performance was controlled by West Waste Tank Farms work package 2W-94-322. The ATP was conducted following the final installation of a second Whittaker electro-chemical hydrogen monitoring cell. The cabinet had been sited on the waste tank two years earlier, but never connected to the exhaust vent header to monitor Tank 241-SY-103 vent header exhaust gases. The cabinet was then modified, to remove two undesirable solid state hydrogen monitors and install a second Whittaker electro-chemical hydrogen monitoring sensor and signal conditioning. The ATP was used to assure that the cabinet wiring and components were properly installed and labeled and that the two years without operation had not seriously damaged the installed equipment. Electrical and pneumatic tests were performed to assure system integrity.

  20. The Adult Roles Models Program: Feasibility, Acceptability, and Initial Outcomes

    PubMed Central

    Silver, Ellen Johnson; Dean, Randa; Perez, Amanda; Rivera, Angelic

    2014-01-01

    We present the feasibility and acceptability of a parent sexuality education program led by peer educators in community settings. We also report the results of an outcome evaluation with 71 parents who were randomized to the intervention or a control group, and surveyed one month prior to and six months after the 4-week intervention. The program was highly feasible and acceptable to participants, and the curriculum was implemented with a high level of fidelity and facilitator quality. Pilot data show promising outcomes for increasing parental knowledge, communication, and monitoring of their adolescent children. PMID:24883051

  1. 105K West Isolation Barrier Acceptance Test results

    SciTech Connect

    McCracken, K.J.; Irwin, J.J.

    1995-05-18

    The objective of this document is to report and interpret the findings of the isolation barrier acceptance tests performed in 105KW/100K. The tests were performed in accordance with the test plan and acceptance test procedure. The test report contains the test data. This document compares the test data against the criteria. A discussion of the leak rate analytical characterization describes how the flow characteristics flow rate will be determined using the test data from the test report. Two modes of water loss were considered; basin and/or discharge chute leakage, and evaporation. An initial test established baseline leakage data and instrumentation performance. Test 2 evaluated the sealing performance of the isolation barrier by inducing an 11 in. (27.9 cm) level differential across the barrier. The leak rate at this 11 in. (27.9 cm) level is extrapolated to the 16 ft. (4.9 m) level differential postulated in the DBE post seismic event. If the leak rate, adjusted for evaporation and basin leakage (determined from Test 1), is less than the SAR limit of 1,500 gph (5,680 lph) at a 16 ft (4.9 m) level differential, the barriers pass the acceptance test.

  2. Acceptance test report MICON software exhaust fan control

    SciTech Connect

    Keck, R.D.

    1998-06-12

    This test procedure specifies instructions for acceptance testing of software for exhaust fan control under Project ESPT (Energy Savings Performance Contract). The software controls the operation of two emergency exhaust fans when there is a power failure. This report details the results of acceptance testing for the MICON software upgrades. One of the modifications is that only one of the emergency fans will operate at all times. If the operating fan shuts off or fails, the other fan will start and the operating fan will be stopped.

  3. 14 CFR 91.1071 - Crewmember: Tests and checks, grace provisions, training to accepted standards.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... performance to the person conducting the check, the program manager may not use the pilot, nor may the pilot... OPERATING AND FLIGHT RULES Fractional Ownership Operations Program Management § 91.1071 Crewmember: Tests... provisions, training to accepted standards. 91.1071 Section 91.1071 Aeronautics and Space FEDERAL...

  4. Acceptance test report, plutonium finishing plant life safety upgrade

    SciTech Connect

    Hodge, S.G.

    1994-12-02

    This acceptance Test Procedure (ATP) has been prepared to demonstrate that modifications to the Fir Protection systems function as required by project criteria. The ATP will test the Fire Alarm Control Panels, Flow Alarm Pressure Switch, Heat Detectors, Smoke Detectors, Flow Switches, Manual Pull Stations, and Gong/Door By Pass Switches.

  5. Acceptance test report for portable exhauster POR-007/Skid E

    SciTech Connect

    Kriskovich, J.R.

    1998-07-24

    This document describes Acceptance Testing performed on Portable Exhauster POR-007/Skid E. It includes measurements of bearing vibration levels, pressure decay testing, programmable logic controller interlocks, high vacuum, flow and pressure control functional testing. The purpose of Acceptance testing documented by this report was to demonstrate compliance of the exhausters with the performance criteria established within HNF-0490, Rev. 1 following a repair and upgrade effort at Hanford. In addition, data obtained during this testing is required for the resolution of outstanding Non-conformance Reports (NCR), and finally, to demonstrate the functionality of the associated software for the pressure control and high vacuum exhauster operating modes provided for by W-320. Additional testing not required by the ATP was also performed to assist in the disposition and close out of receiving inspection report and for application design information (system curve). Results of this testing are also captured within this document.

  6. Acceptance test report for the Westinghouse 100 ton hydraulic trailer

    SciTech Connect

    Barrett, R.A.

    1995-03-06

    The SY-101 Equipment Removal System 100 Ton Hydraulic Trailer was designed and built by KAMP Systems, Inc. Performance of the Acceptance Test Procedure at KAMP`s facility in Ontario, California (termed Phase 1 in this report) was interrupted by discrepancies noted with the main hydraulic cylinder. The main cylinder was removed and sent to REMCO for repair while the trailer was sent to Lampson`s facility in Pasco, Washington. The Acceptance Test Procedure was modified and performance resumed at Lampson (termed Phase 2 in this report) after receipt of the repaired cylinder. At the successful conclusion of Phase 2 testing the trailer was accepted as meeting all the performance criteria specified.

  7. Low-fat school lunch programs: achieving acceptance.

    PubMed

    Demas, A

    1998-11-26

    A study was carried out to determine whether hands-on classroom experience with low-fat foods would increase children's acceptance of those foods in the school's lunch program. The 9-month project took place at an elementary school in upstate New York. Half of the classrooms served as the intervention group and received classroom experience with new foods; the other half served as the control group and received no classroom experience. Consumption measurements of 16 new foods, introduced at approximately 2-week intervals, were taken for all students who ate school lunches. Compared with children in the control group, those in the intervention group ate significantly more of the new foods when they were offered in the lunch program. The study demonstrated that experiential learning about food in the classroom is an effective way to gain acceptance of diverse, low-fat foods in the school lunch program. PMID:9860382

  8. Acceptance Test Plan for the Sludge Pickup Adaptor

    SciTech Connect

    PITNER, A.L.

    2000-03-29

    This test plan documents the acceptance testing of the sludge pickup adapter for potential use during PSI Phases 3 and 4 fuel cleanliness inspection activities. The adaptex is attached to the strainer tip of the vacuum wand and used to suction up residual sludge captured in a sludge collection tray. The material is vacuumed into a chamber of known volume in the sludge pickup adapter. The device serves as an aid in helping to determine whether the observed quantity of sludge is within allowable limits (1.4 cm{sup 3} per fuel assembly). This functionality test involves underwater testing in the 305 Building Cold Test Facility to verify that sludge can be successfully vacuumed from a collection tray. Ancillary activities in this acceptance test include demonstration that the sludge pickup adapter CM be successfully attached to and detached from the vacuum wand underwater.

  9. DUAL ALKALI ACCEPTANCE TEST AT LOUISVILLE GAS AND ELECTRIC COMPANY; VOLUME I. ACCEPTANCE TEST AND APPENDICES A-C

    EPA Science Inventory

    The report gives results of the completed acceptance test series run on the dual alkali system serving Louisville Gas and Electric Company's Cane Run Unit 6 boiler. This volume contains the process description and a discussion of the test results, operating history, and performan...

  10. Test-driven programming

    NASA Astrophysics Data System (ADS)

    Georgiev, Bozhidar; Georgieva, Adriana

    2013-12-01

    In this paper, are presented some possibilities concerning the implementation of a test-driven development as a programming method. Here is offered a different point of view for creation of advanced programming techniques (build tests before programming source with all necessary software tools and modules respectively). Therefore, this nontraditional approach for easier programmer's work through building tests at first is preferable way of software development. This approach allows comparatively simple programming (applied with different object-oriented programming languages as for example JAVA, XML, PYTHON etc.). It is predictable way to develop software tools and to provide help about creating better software that is also easier to maintain. Test-driven programming is able to replace more complicated casual paradigms, used by many programmers.

  11. Verification and acceptance tests of the PRIMA DDL optics

    NASA Astrophysics Data System (ADS)

    Bizenberger, Peter; Baumeister, Harald; Graser, Uwe; Henning, Thomas; Krause, Nathalie; Launhardt, Ralf; Naranjo, Vianak; Queloz, Didier; Quirrenbach, Andreas

    2008-07-01

    The last step in designing and building instruments are the verification and acceptance tests of the assembled units and of the final instrument. For instruments, which are engineered to work at the limit of feasibility, these tests must be accurate and stable at a level much better than the expected performance of the instrument. Particularly for interferometric instruments, this requires special care for the test planning and implementation in order to achieve the necessary performance. This paper describes the verification and acceptance tests of the PRIMA DDL optics in terms of wavefront error and tilt requirements as well as the assembling and aligning accuracy. We demonstrate the conformity of the optics and point out the limitations of the test methods.

  12. SEP BIMOD variable conductance heat pipes acceptance and characterization tests

    NASA Technical Reports Server (NTRS)

    Hemminger, J. A.

    1981-01-01

    A series of six heat pipes, similar in design to those flown on the Comunications Technology Satellite Hermes, for use in a prototype Solar Electric Propulsion BIMOD thrust module are evaluated. The results of acceptance and characterization tests performed on the heat pipe subassemble are reported. The performance of all the heat pipes met, or exceeded, design specifications.

  13. SEP BIMOD variable conductance heat pipes acceptance and characterization tests

    NASA Astrophysics Data System (ADS)

    Hemminger, J. A.

    1981-08-01

    A series of six heat pipes, similar in design to those flown on the Comunications Technology Satellite Hermes, for use in a prototype Solar Electric Propulsion BIMOD thrust module are evaluated. The results of acceptance and characterization tests performed on the heat pipe subassemble are reported. The performance of all the heat pipes met, or exceeded, design specifications.

  14. Electromagnetic induction moisture measurement system acceptance test report

    SciTech Connect

    Vargo, G.J.

    1996-10-07

    This document presents the results of the acceptance test for the hardware and software that was developed to operate the ElectroMagnetic Induction (EMI) moisture measurement system to be used for in-tank moisture measurements. This document satisfies EP 4.1, ``Design Verification Requirements``.

  15. 46 CFR 164.013-5 - Acceptance tests.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 6 2013-10-01 2013-10-01 false Acceptance tests. 164.013-5 Section 164.013-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL MATERIALS Foam, Unicellular Polyethylene (Buoyant, Slab, Slitted Trigonal...

  16. 46 CFR 164.013-5 - Acceptance tests.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 6 2011-10-01 2011-10-01 false Acceptance tests. 164.013-5 Section 164.013-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL MATERIALS Foam, Unicellular Polyethylene (Buoyant, Slab, Slitted Trigonal...

  17. 46 CFR 164.013-5 - Acceptance tests.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Acceptance tests. 164.013-5 Section 164.013-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL MATERIALS Foam, Unicellular Polyethylene (Buoyant, Slab, Slitted Trigonal...

  18. 46 CFR 164.013-5 - Acceptance tests.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 6 2012-10-01 2012-10-01 false Acceptance tests. 164.013-5 Section 164.013-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL MATERIALS Foam, Unicellular Polyethylene (Buoyant, Slab, Slitted Trigonal...

  19. Standard-D hydrogen monitoring system acceptance test

    SciTech Connect

    Lott, D.T., Westinghouse Hanford

    1996-05-24

    This document details the results of the field Acceptance Testing of the Standard-D Hydrogen Monitoring System on the waste tank exhaust stacks in 241-AW and 241-AN tank farm. The monitors will be used to measure hydrogen and ammonia from the exhaust stacks.

  20. Acceptance Test Plan for Fourth-Generation Corrosion Monitoring Cabinet

    SciTech Connect

    NORMAN, E.C.

    2000-10-23

    This Acceptance Test Plan (ATP) will document the satisfactory operation of the third-generation corrosion monitoring cabinet (Hiline Engineering Part No.0004-CHM-072-C01). This ATP will be performed by the manufacturer of the cabinet prior to delivery to the site. The objective of this procedure is to demonstrate and document the acceptance of the corrosion monitoring cabinet. The test will consist of a continuity test of the cabinet wiring from the end of cable to be connected to corrosion probe, through the appropriate intrinsic safety barriers and out to the 15 pin D-shell connectors to be connected to the corrosion monitoring instrument. Additional testing will be performed using a constant current and voltage source provided by the corrosion monitoring hardware manufacturer to verify proper operation of corrosion monitoring instrumentation.

  1. Redstone Test Stand Accepted Into National Register of Historical Places

    NASA Technical Reports Server (NTRS)

    1976-01-01

    On October 02, 1976, Marshall Space Flight Center's (MSFC) Redstone test stand was received into the National Registry of Historical Places. Photographed in front of the Redstone test stand are Dr. William R. Lucas, MSFC Center Director from June 15, 1974 until July 3, 1986, as he is accepting a certificate of registration from Madison County Commission Chairman James Record, and Huntsville architect Harvie Jones.

  2. Rotary mode core sampling service trailer Acceptance Test Plan

    SciTech Connect

    Kostelnik, A.J.

    1994-11-28

    This Acceptance Test Procedure (ATP) will document compliance with the requirements of specification WHC-S-056 Rev.2 including ECNs 608798 and 616386. The equipment being tested is a furniture type trailer with storage cabinets, lighting and HVAC systems installed. The unit was purchased as a Design and Fabrication procurement activity. The ATP be performed by representatives of the Westinghouse Hanford Company with the assistance of the Seller at the Seller`s location.

  3. PUREX (SAMCONS) uninterruptible power supply (UPS) acceptance test procedure

    SciTech Connect

    Blackaby, W.B.

    1997-09-01

    This Acceptance Test Procedure for the PUREX Surveillance and Monitoring and Control System (SAMCONS) Uninterruptible Power Supply (UPS) provides for testing and verifying the proper operation of the control panel alarms and trouble functions, the 6roper functioning of the AC inverter, ability of the battery supply to maintain the SAMCONS load for a minimum of two hours , and proper interaction with the SAMCONS Video graphic displays for alarm displays.

  4. Simulating smokers' acceptance of modifications in a cessation program.

    PubMed Central

    Spoth, R

    1992-01-01

    Recent research has underscored the importance of assessing barriers to smokers' acceptance of cessation programs. This paper illustrates the use of computer simulations to gauge smokers' response to program modifications which may produce barriers to participation. It also highlights methodological issues encountered in conducting this work. Computer simulations were based on conjoint analysis, a consumer research method which enables measurement of smokers' relative preference for various modifications of cessation programs. Results from two studies are presented in this paper. The primary study used a randomly selected sample of 218 adult smokers who participated in a computer-assisted phone interview. Initially, the study assessed smokers' relative utility rating of 30 features of cessation programs. Utility data were used in computer-simulated comparisons of a low-cost, self-help oriented program under development and five other existing programs. A baseline version of the program under development and two modifications (for example, use of a support group with a higher level of cost) were simulated. Both the baseline version and modifications received a favorable response vis-à-vis comparison programs. Modifications requiring higher program costs were, however, associated with moderately reduced levels of favorable consumer response. The second study used a sample of 70 smokers who responded to an expanded set of smoking cessation program features focusing on program packaging. This secondary study incorporate in-person, computer-assisted interviews at a shopping mall, with smokers viewing an artist's mock-up of various program options on display. A similar pattern of responses to simulated program modifications emerged, with monetary cost apparently playing a key role. The significance of conjoint-based computer simulation as a tool in program development or dissemination, salient methodological issues, and implications for further research are discussed

  5. Drug testing programs.

    PubMed

    Willette, R E

    1986-01-01

    Many Federal agencies and private companies are conducting drug tests on job applicants and employees. Although the reasons for testing and the circumstances under which testing is conducted vary considerably, the main intent of these programs is to provide a drug-free environment for other employees and a safe service to the public. The programs that have been most successful usually include a clear communication to all employees and applicants as to the nature of the drug program and the consequences of detected drug use. Also, successful programs usually afford employees some type of assistance and a second chance. Finally, it is essential for successful programs to provide a reasonable and fair approach that includes procedures for due process, that is, a line of review and appeal. PMID:3127722

  6. KEPONE INCINERATION TEST PROGRAM

    EPA Science Inventory

    The Kepone Incineration Test (KIT) program was undertaken to evaluate incineration as a method of destroying Kepone and Kepone-containing materials and to determine the range of operating variables required for complete destruction. The program was divided into two phases: (a) ex...

  7. Handheld technology acceptance in radiologic science education and training programs

    NASA Astrophysics Data System (ADS)

    Powers, Kevin Jay

    The purpose of this study was to explore the behavioral intention of directors of educational programs in the radiologic sciences to adopt handheld devices to aid in managing student clinical data. Handheld devices were described to participants as a technology representing a class of mobile electronic devices including, but not limited to, personal digital assistants such as a Palm TX, Apple iPod Touch, Apple iPad or Hewlett Packard iPaq, and cellular or smartphones with third generation mobile capabilities such as an Apple iPhone, Blackberry or Android device. The study employed a non-experimental, cross-sectional survey design to determine the potential of adopting handheld technologies based on the constructs of Davis's (1989) Technology Acceptance Model. An online self-report questionnaire survey instrument was used to gather study data from 551 entry level radiologic science programs specializing in radiography, radiation therapy, nuclear medicine and medical sonography. The study design resulted in a single point in time assessment of the relationship between the primary constructs of the Technology Acceptance Model: perceived usefulness and perceived ease of use, and the behavioral intention of radiography program directors to adopt the information technology represented by hand held devices. Study results provide justification for investing resources to promote the adoption of mobile handheld devices in radiologic science programs and study findings serve as a foundation for further research involving technology adoption in the radiologic sciences.

  8. 10 CFR 26.91 - Acceptable devices for conducting initial and confirmatory tests for alcohol and methods of use.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Acceptable devices for conducting initial and confirmatory tests for alcohol and methods of use. 26.91 Section 26.91 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Collecting Specimens for Testing § 26.91 Acceptable devices for conducting...

  9. 10 CFR 26.91 - Acceptable devices for conducting initial and confirmatory tests for alcohol and methods of use.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Acceptable devices for conducting initial and confirmatory tests for alcohol and methods of use. 26.91 Section 26.91 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Collecting Specimens for Testing § 26.91 Acceptable devices for conducting...

  10. 10 CFR 26.91 - Acceptable devices for conducting initial and confirmatory tests for alcohol and methods of use.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Acceptable devices for conducting initial and confirmatory tests for alcohol and methods of use. 26.91 Section 26.91 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Collecting Specimens for Testing § 26.91 Acceptable devices for conducting...

  11. 10 CFR 26.91 - Acceptable devices for conducting initial and confirmatory tests for alcohol and methods of use.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Acceptable devices for conducting initial and confirmatory tests for alcohol and methods of use. 26.91 Section 26.91 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Collecting Specimens for Testing § 26.91 Acceptable devices for conducting...

  12. 10 CFR 26.91 - Acceptable devices for conducting initial and confirmatory tests for alcohol and methods of use.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Acceptable devices for conducting initial and confirmatory tests for alcohol and methods of use. 26.91 Section 26.91 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Collecting Specimens for Testing § 26.91 Acceptable devices for conducting...

  13. Final Acceptance Tests of Helium Refrigerator for Wendelstein 7-X

    NASA Astrophysics Data System (ADS)

    Dhard, C. P.; Nagel, M.; Raatz, S.; Nuesslein, U.; Ressel, M.

    Following successful installation and commissioning, final acceptance tests were carried out on the helium refrigerator for Wendelstein 7-X.The tests were carried out for the normal operating modes i.e. peak power mode (3.4 K), standard mode(3.9 K), short standby mode (< 10 K) and long standby mode (< 100 K).Besides the normal modes, the transient modes including, cool-down and warm-up, auto interchanging between various modes and the purging modes were tested.In addition, the handling of quench, emergency signals such as cryostat vacuum break,utility failure, alarm and trip signals were checked.

  14. MAC Version 3.3, MBA Version 1.3 acceptance test summary report

    SciTech Connect

    Russell, V.K.

    1994-11-02

    The K Basins Materials Accounting (MAC) and Materials Balance (MBA) programs had the Paradox Code Cleanup ATP run to check out the systems. This report describes the results of the test and provides the signoff sheets associated with the testing. The Acceptance Test results indicate that the MAC and MBA systems are ready for operation using the cleaned up code. The final codes were removed to the production space on the customer server on April 15th.

  15. Space shuttle orbiter vehicle star tracker test program plan

    NASA Technical Reports Server (NTRS)

    Smith, R. A.

    1974-01-01

    The development model test program was written to provide guidance for essential star tracker test support to the Space Shuttle Orbiter Program. The program organization included test equipment preparation, prototype baseline/acceptance tests, prototype total performance tests, and prototype special tests. Test configurations, preparation phase, documentation, scheduling, and manpower requirements are discussed. The test program permits an early evaluation of the tracker's performance prior to completion and testing of the final flight models.

  16. MCO combustible gas management leak test acceptance criteria

    SciTech Connect

    SHERRELL, D.L.

    1999-05-11

    Existing leak test acceptance criteria for mechanically sealed and weld sealed multi-canister overpacks (MCO) were evaluated to ensure that MCOs can be handled and stored in stagnant air without compromising the Spent Nuclear Fuel Project's overall strategy to prevent accumulation of combustible gas mixtures within MCO's or within their surroundings. The document concludes that the integrated leak test acceptance criteria for mechanically sealed and weld sealed MCOs (1 x 10{sup -5} std cc/sec and 1 x 10{sup -7} std cc/sec, respectively) are adequate to meet all current and foreseeable needs of the project, including capability to demonstrate compliance with the NFPA 60 Paragraph 3-3 requirement to maintain hydrogen concentrations [within the air atmosphere CSB tubes] t or below 1 vol% (i.e., at or below 25% of the LFL).

  17. Acceptance test report for portable exhauster POR-008/Skid F

    SciTech Connect

    Kriskovich, J.R.

    1998-07-24

    Portable Exhauster POR-008 was procured via HNF-0490, Specification for a Portable Exhausted System for Waste Tank Ventilation. Prior to taking ownership, acceptance testing was performed at the vendors. However at the conclusion of testing a number of issues remained that required resolution before the exhausters could be used by Project W-320. The purpose of acceptance testing documented by this report was to demonstrate compliance of the exhausters with the performance criteria established within HNF-O49O, Rev. 1 following a repair and upgrade effort at Hanford. In addition, data obtained during this testing is required for the resolution of outstanding Non-conformance Reports (NCR), and finally, to demonstrate the functionality of the associated software for the pressure control and high vacuum exhauster operating modes provided for by W-320. Additional testing not required by the ATP was also performed to assist in the disposition and close out of receiving inspection report and for application design information (system curve). Results of this testing are also captured within this document.

  18. Acceptance testing of integrated picture archiving and communications systems.

    PubMed

    Lewis, T E; Horton, M C; Kinsey, T V; Shelton, P D

    1999-05-01

    An integrated picture archiving and communication system (PACS) is a large investment in both money and resources. With all of the components and systems contained in the PACS, a methodical set of protocols and procedures must be developed to test all aspects of the PACS within the short time allocated for contract compliance. For the Department of Defense (DoD), acceptance testing (AT) sets the protocols and procedures. Broken down into modules and test procedures that group like components and systems, the AT protocol maximizes the efficiency and thoroughness of testing all aspects of an integrated PACS. A standardized and methodical protocol reduces the probability of functionality or performance limitations being overlooked. The AT protocol allows complete PACS testing within the 30 days allocated by the digital imaging network (DIN)-PACS contract. AT shortcomings identified during the testing phase properly allows for resolution before complete acceptance of the system. This presentation will describe the evolution of the process, the components of the DoD AT protocol, the benefits of the AT process, and its significance to the successful implementation of a PACS. This is a US government work. There are no restrictions on its use. PMID:10342200

  19. 242A Distributed Control System Year 2000 Acceptance Test Report

    SciTech Connect

    TEATS, M.C.

    1999-08-31

    This report documents acceptance test results for the 242-A Evaporator distributive control system upgrade to D/3 version 9.0-2 for year 2000 compliance. This report documents the test results obtained by acceptance testing as directed by procedure HNF-2695. This verification procedure will document the initial testing and evaluation of the potential 242-A Distributed Control System (DCS) operating difficulties across the year 2000 boundary and the calendar adjustments needed for the leap year. Baseline system performance data will be recorded using current, as-is operating system software. Data will also be collected for operating system software that has been modified to correct year 2000 problems. This verification procedure is intended to be generic such that it may be performed on any D/3{trademark} (GSE Process Solutions, Inc.) distributed control system that runs with the VMSTM (Digital Equipment Corporation) operating system. This test may be run on simulation or production systems depending upon facility status. On production systems, DCS outages will occur nine times throughout performance of the test. These outages are expected to last about 10 minutes each.

  20. MAC mini acceptance test procedure, software Version 3.0

    SciTech Connect

    Russell, V.K.

    1994-10-17

    The K Basins Materials Accounting (MAC) programs had some major improvements made to it to organize the main-tables by Location, Canister, and Material. This ATP describes how the code was to be tested to verify its correctness.

  1. Nevada Test Site Waste Acceptance Criteria (NTSWAC), Rev. 7-01

    SciTech Connect

    NSTec Environmental Management

    2009-05-01

    This document establishes the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, Nevada Test Site Waste Acceptance Criteria (NTSWAC). The NTSWAC provides the requirements, terms, and conditions under which the Nevada Test Site (NTS) will accept low-level radioactive waste and mixed low-level waste for disposal. The NTSWAC includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the NTS Area 3 and Area 5 Radioactive Waste Management Complex for disposal.

  2. When is diagnostic testing inappropriate or irrational? Acceptable regret approach.

    PubMed

    Hozo, Iztok; Djulbegovic, Benjamin

    2008-01-01

    The authors provide a new model within the framework of theories of bounded rationality for the observed physicians' behavior that their ordering of diagnostic tests may not be rational. Contrary to the prevailing thinking, the authors find that physicians do not act irrationally or inappropriately when they order diagnostic tests in usual clinical practice. When acceptable regret (i.e., regret that a decision maker finds tolerable upon making a wrong decision) is taken into account, the authors show that physicians tend to order diagnostic tests at a higher level of pretest probability of disease than predicted by expected utility theory. They also show why physicians tend to overtest when regret about erroneous decisions is extremely small. Finally, they explain variations in the practice of medicine. They demonstrate that in the same clinical situation, different decision makers might have different acceptable regret thresholds for withholding treatment, for ordering a diagnostic test, or for administering treatment. This in turn means that for some decision makers, the most rational strategy is to do nothing, whereas for others, it may be to order a diagnostic test, and still for others, choosing treatment may be the most rational course of action. PMID:18480041

  3. (AVR test program review)

    SciTech Connect

    Cleveland, J.

    1989-06-11

    The Subprogram for Cooperation in the AVR Test Program is being carried out within the United States/FRG High-Temperature Reactor Umbrella Agreement. The AVR Test Program is investigating performance and safety features pertinent to modular gas-cooled reactors. This program is providing experimental information beneficial to the US High Temperature Gas-Cooled Reactor Program, which is developing a Modular High-Temperature Gas-Cooled Reactor (MHTGR) concept (135 MW(e), 350 MW(t)). Relative to US interests, AVR test data are being utilized to help validate computational methods used for modular High-Temperature Gas-Cooled Reactor (MHTGR) design and licensing. Information was obtained at the conference relevant to the cooperative subprogram in the areas of AVR operating experience, measurement results, and analytical predictions by AVR and KFA. An effort was initiated to document AVR quality assurance practices and procedures relevant to the tests included in the cooperative subprogram, and to compare these with the spirit of quality assurance requirements and guidelines applied to experimental programs conducted within the United States. The status of the various Project Work Statements in the Subprogram was reviewed.

  4. Nevada Test Site waste acceptance criteria [Revision 1

    SciTech Connect

    1997-08-01

    Revision one updates the requirements, terms, and conditions under which the Nevada Test Site (NTS) will accept low-level radioactive and mixed waste for disposal; and transuranic and transuranic mixed waste for interim storage at the NTS. Review each section of this document. This document is not intended to include all of the requirements; rather, it is meant as a guide toward meeting the regulations. All references in this document should be observed to avoid omission of requirements on which acceptance or rejection of waste will be based. The Department of Energy/Nevada Operations Office (DOE/NV) and support contractors are available to assist you in understanding or interpreting this document.

  5. Acceptance test report for project C-157 ``T-Plant electrical upgrade``

    SciTech Connect

    Jeppson, L.A.

    1997-08-05

    This Acceptance Test Report (ATR) documents for record purposes the field results, acceptance, and approvals of the completed acceptance test per WHC-SD-Cl57-ATP-001, Rev. 0, ``Acceptance Test Proceedure for Project C-157 `T Plant Electrical Upgrade``` The test was completed and approved without any problems or exceptions.

  6. Manipulator comparative testing program

    SciTech Connect

    Draper, J.V.; Handel, S.J.; Sundstrom, E.; Herndon, J.N.; Fujita, Y.; Maeda, M.

    1986-01-01

    The Manipulator Comparative Testing Program examined differences among manipulator systems from the United States and Japan. The manipulator systems included the Meidensha BILARM 83A, the Model M-2 of Central Research Laboratories Division of Sargent Industries (CRL), and the GCA Corporation PaR Systems Model 6000. The site of testing was the Remote Operations Maintenance Demonstration (ROMD) facility, operated by the Fuel Recycle Division in the Consolidated Fuel Reprocessing Program at the Oak Ridge National Laboratory (ORNL). In all stages of testing, operators using the CRL Model M-2 manipulator had consistently lower times to completion and error rates than they did using other machines. Performance was second best with the Meidensha BILARM 83A in master-slave mode. Performance with the BILARM in switchbox mode and the PaR 6000 manipulator was approximately equivalent in terms of criteria recorded in testing. These data show no impact of force reflection on task performance.

  7. Acceptance Test Report for Fourth Generation Hanford Corrosion Monitoring System

    SciTech Connect

    NORMAN, E.C.

    2000-10-23

    This Acceptance Test Report (ATR) will document the satisfactory operation of the corrosion probe cabinets destined for installation on tanks 241-AN-102 and 241-AN-107. This ATR will be performed by the manufacturer on each cabinet prior to delivery to the site. The objective of this procedure is to demonstrate and document the acceptance of the corrosion monitoring cabinets to be installed on tanks 241-AN-102 and 241-AN-107. One cabinet will be installed on each tank. Each cabinet will contain corrosion monitoring hardware to be connected to existing corrosion probes already installed in each tank. The test will consist of a continuity test of the cabinet wiring from the end of cable to be connected to corrosion probe, through the appropriate intrinsic safety barriers and out to the 15 pin D-shell connectors to be connected to the corrosion monitoring instrument. Additional testing will be performed using a constant current and voltage source provided by the corrosion monitoring hardware manufacturer to verify proper operation of corrosion monitoring instrumentation (input a known signal and see if the instrumentation records the proper value).

  8. Acceptance test plan for fourth generation Hanford corrosion monitoring system

    SciTech Connect

    NORMAN, E.C.

    2000-07-27

    This Acceptance Test Plan (ATP) will document the satisfactory operation of the corrosion probe cabinets destined for installation on tanks 241-AN-102 and 241-AN-107. This ATP will be performed by the manufacturer on each cabinet prior to delivery to the site. The objective of this procedure is to demonstrate and document the acceptance of the corrosion monitoring cabinets to be installed on tanks 241-AN-102 and 241-AN-107. One cabinet will be installed on each tank. Each cabinet will contain corrosion monitoring hardware to be connected to existing corrosion probes already installed in each tank. The test will consist of a continuity test of the cabinet wiring from the end of cable to be connected to corrosion probe, through the appropriate intrinsic safety barriers and out to the 15 pin D-shell connectors to be connected to the corrosion monitoring instrument. Additional testing will be performed using a constant current and voltage source provided by the corrosion monitoring hardware manufacturer to verify proper operation of corrosion monitoring instrumentation (input a known signal and see if the instrumentation records the proper value).

  9. PUMA test program for SBWR

    SciTech Connect

    Ishii, M.; Revankar, S.T.; Dowlati, R.

    1996-03-01

    The objective of the PUMA integral test program is to obtain confirmatory test data for the SBWR Developed by the General Electric-Nuclear Energy Company. The program was initiated in July 1993 under the sponsorship of the NRC. The SBWR has a simplified coolant circulation system and a passive emergency cooling system. The engineered safety systems and safety-grade systems in the SBWR are: (1) the Automatic Depressurization System (ADS), (2) the Gravity-Driven Cooling System (GDCS), (3) the Passive Containment Cooling System (PCCS), (4) the Isolation Condenser Systems (ICS), and (5) the Pressure Suppression Pool (SP). The GDCS and PCCS are new designs unique to the SBWR and do not exist in operating BWRs. The ICS is similar to those in some operating BWRs. The PCCS is designed for low-pressure operation for the containment cooling, but the ICS is capable of high pressure operation as well to cool the reactor pressure vessel. The PUMA design was completed based on an extensive scaling analysis. The PUMA facility having 1/4 height and 1/400 volume scales is constructed. Various facility characterization tests and instrumentation and data acquisition system checks are performed presently. The facility acceptance test will be performed in November and integral tests will be initiated.

  10. The Feasibility and Acceptability of “Arise”: An Online Substance Abuse Relapse Prevention Program

    PubMed Central

    Bartel, Chelsea M.

    2015-01-01

    Abstract Objective: The purpose of this study was to test the feasibility and acceptability of a novel online adolescent substance abuse relapse prevention tool, “Arise” (3C Institute, Cary, NC). The program uses an innovative platform including interactive instructional segments and skill-building games to help adolescents learn and practice coping skills training strategies. Materials and Methods: We conducted a pilot test with nine adolescents in substance abuse treatment (44 percent female) and a feasibility test with treatment providers (n=8; 50 percent female). Adolescents interacted with the program via a secure Web site for approximately 30 minutes for each of two instructional units. Treatment providers reviewed the same material at their own pace. All participants completed a questionnaire with items assessing usability, acceptability, understanding, and subjective experience of the program. Results: Regarding feasibility, recruitment of this population within the study constraints proved challenging, but participant retention in the trial was high (no attrition). Adolescents and treatment providers completed the program with no reported problems, and overall we were able to collect data as planned. Regarding acceptability, the program received strong ratings from both adolescents and providers, who found the prototype informative, engaging, and appealing. Both groups strongly recommended continuing development. Conclusions: We were able to deliver the intervention as intended, and acceptability ratings were high, demonstrating the feasibility and acceptability of online delivery of engaging interactive interventions. This study contributes to our understanding of how interactive technologies, including games, can be used to modify behavior in substance abuse treatment and other health areas. PMID:26181807

  11. Acceptability of prenatal testing and termination of pregnancy in Pakistan.

    PubMed

    Jafri, H; Hewison, J; Sheridan, E; Ahmed, S

    2015-01-01

    This study aimed to assess acceptability of prenatal testing (PNT) and termination of pregnancy (TOP) for a range of conditions in Pakistani parents with and without a child with a genetic condition. A structured questionnaire assessing acceptability of PNT and TOP for 30 conditions was completed by 400 Pakistani participants: 200 parents with a child with a genetic condition (100 fathers and 100 mothers) and 200 parents without an affected child (100 fathers and 100 mothers). There was a high level of interest in PNT, where over 80 % of parents in all four study groups would want PNT for the majority of the conditions. There was comparatively less interest in TOP for the same conditions (ranging from 5 to 70 % of parents, with mothers of an affected child being most interested). Parents were most likely to be interested in TOP for conditions at the serious end of the continuum. More than half of the participants in each group would consider TOP for anencephaly and quadriplegia. The interest in PNT and TOP for a range of conditions suggests that rapidly developing PNT technologies are likely to be acceptable in Pakistan, a low-middle income level and Muslim country. The comparatively lower level of interest in TOP for the same conditions highlights ethical dilemmas that such technologies are likely to raise. PMID:25081227

  12. [Clinical trial data validation and user acceptance testing].

    PubMed

    Sun, Hua-long; Dai, Nan

    2015-11-01

    For pharmaceutical industries, clinical data is one of the most valuable deliverables. It is also the basis of analysis, submission, approval, labeling and marketing of a drug product. To ensure the integrity and reliability of clinical data, a scientific standardized quality control (QC) has to be established at each step of a clinical trial. Data validation is conducted to ensure the reasonability and compliance of clinical data by checking data quality before the data is statistically analyzed. This paper focuses on purpose of data validation, creation of data validation plan, rationale of data validation, types of data validation and performance of user acceptance testing on clinical database. PMID:26911047

  13. Acceptance test procedure for SY Tank Farm replacement exhauster unit

    SciTech Connect

    Becken, G.W.

    1994-12-16

    The proper functioning of a new 241-SY Tank Farm replacement exhauster will be acceptance tested, to establish operability and to provide an operational baseline for the equipment. During this test, a verification of all of the alarm and control circuits associated with the exhaust, which provide operating controls and/or signals to local and remote alarm/annunciator panels, shall be performed. Test signals for sensors that provide alarms, warnings, and/or interlocks will be applied to verify that alarm, warning, and interlock setpoints are correct. Alarm and warning lights, controls, and local and remote readouts for the exhauster will be verified to be adequate for proper operation of the exhauster. Testing per this procedure shall be conducted in two phases. The first phase of testing, to verify alarm, warning, and interlock setpoints primarily, will be performed in the MO-566 Fab Shop. The second phase of testing, to verify proper operation and acceptable interface with other tank farm systems, will be conducted after the exhauster and all associated support and monitoring equipment have been installed in the SY Tank Farm. The exhauster, which is mounted on a skid and which will eventually be located in the SY tank farm, receives input signals from a variety of sensors mounted on the skid and associated equipment. These sensors provide information such as: exhauster system inlet vacuum pressure; prefilter and HEPA filter differential pressures; exhaust stack sampler status; exhaust fan status; system status (running/shut down); and radiation monitoring systems status. The output of these sensors is transmitted to the exhauster annunciator panel where the signals are displayed and monitored for out-of-specification conditions.

  14. Test Report for Acceptance Test Procedure for Pumping and Instrumentation Control Skid ''K''

    SciTech Connect

    JOHNS, B.R.

    1999-10-28

    This is a Test Report for Acceptance Test Procedure (ATP) HNF-4276. This test report provides the results of the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''K''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  15. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid N

    SciTech Connect

    KOCH, M.R.

    2000-02-03

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5489. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''N''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  16. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid L

    SciTech Connect

    KOCH, M.R.

    1999-11-09

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5055. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''L''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  17. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid M

    SciTech Connect

    KOCH, M.R.

    1999-12-13

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5073. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''M''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  18. Topographical mapping system for radiological and hazardous environments acceptance testing

    SciTech Connect

    Armstrong, G.A.; Dochat, G.R.

    1997-12-01

    During the summer of 1996, the Topographical Mapping System (TMS) for hazardous and radiological environments and its accompanying three-dimensional (3-D) visualization tool, the Interactive Computer-Enhanced Remote-Viewing System (ICERVS), were delivered to Oak Ridge National Laboratory (ORNL). ORNL and Mechanical Technology, Inc., performed final acceptance testing of the TMS during the next eight months. The TMS was calibrated and characterized during this period. This paper covers the calibration, characterization, and acceptance testing of the TMS. Development of the TMS and ICERVS was initiated by the US Department of Energy (DOE) for the purpose of characterization and remediation of underground storage tanks (USTs) at DOE sites across the country. DOE required a 3-D, topographical mapping system suitable for use in hazardous and radiological environments. The intended application is the mapping of the interior of USTs as part of DOE`s waste characterization and remediation efforts and to obtain baseline data on the content of the storage tank interiors as well as data on changes in the tank contents and levels brought about by waste remediation steps. Initially targeted for deployment at the Hanford Washington site, the TMS is designed to be a self-contained, compact, and reconfigurable system that is capable of providing rapid, variable-resolution mapping information in poorly characterized workspaces with a minimum of operator intervention.

  19. Topographical mapping system for radiological and hazardous environments acceptance testing

    NASA Astrophysics Data System (ADS)

    Armstrong, Gary A.; Dochat, G. R.

    1997-09-01

    During the summer of 1996, the topographical mapping system (TMS) for hazardous and radiological environments and its accompanying three-dimensional (3-D) visualization tool, the interactive computer-enhanced remote-viewing system (ICERVS), were delivered to Oak Ridge National Laboratory (ORNL). ORNL and Mechanical Technology, Inc., performed final acceptance testing of the TMS during the next eight months. The TMS was calibrated and characterized during this period. This paper covers the calibration, characterization, and acceptance testing of the TMS. Development of the TMS and the ICERVS was initiated by the U.S. Department of Energy (DOE) for the purpose of characterization and remediation of underground storage tanks (USTs) at DOE sites across the country. DOE required a 3-D, topographical mapping system suitable for use in hazardous and radiological environments. The intended application is the mapping of the interior of USTs as part of DOE's waste characterization and remediation efforts and to obtain baseline data on the content of the storage tank interiors as well as data on changes in the tank contents and levels brought about by waste remediation steps. Initially targeted for deployment at the Hanford Washington site, the TMS is designed to be a self-contained, compact, reconfigurable system that is capable of providing rapid, variable-resolution mapping information in poorly characterized workspaces with a minimum of operator intervention.

  20. Factory acceptance test results for the DIRSP projection optics

    NASA Astrophysics Data System (ADS)

    Thomas, Matthew C.; Ward, Craig S.

    2000-07-01

    The Factory Acceptance Test (FAT) results for the projection optical subsystem (POS) of US Army STIRCOM's dynamic infrared scene projector (DIRSP) are presented in this paper. DIRSP is a low background (-35 degrees Celsius) hardware-in-the- loop (HWIL), long-wave infrared (LWIR) scene projector built by Mission Research Corporation (MRC) for use by the Redstone Technical Test Center (RTTC). It has an effective emitter array size of 1632 X 672 suspended-membrane micro-resistor elements. The POS is responsible for generating this effective array size from three smaller arrays using a mosaic image combiner, adding background light from an external blackbody, and collimating the combined radiation with a 5:1 vacuum enclosed -35 degree Celsius zoom lens. The FAT results reported demonstrate good POS performance compared to the design for focal length, F/#, MTF and apparent temperature.

  1. Type of Speech Material Affects Acceptable Noise Level Test Outcome.

    PubMed

    Koch, Xaver; Dingemanse, Gertjan; Goedegebure, André; Janse, Esther

    2016-01-01

    The acceptable noise level (ANL) test, in which individuals indicate what level of noise they are willing to put up with while following speech, has been used to guide hearing aid fitting decisions and has been found to relate to prospective hearing aid use. Unlike objective measures of speech perception ability, ANL outcome is not related to individual hearing loss or age, but rather reflects an individual's inherent acceptance of competing noise while listening to speech. As such, the measure may predict aspects of hearing aid success. Crucially, however, recent studies have questioned its repeatability (test-retest reliability). The first question for this study was whether the inconsistent results regarding the repeatability of the ANL test may be due to differences in speech material types used in previous studies. Second, it is unclear whether meaningfulness and semantic coherence of the speech modify ANL outcome. To investigate these questions, we compared ANLs obtained with three types of materials: the International Speech Test Signal (ISTS), which is non-meaningful and semantically non-coherent by definition, passages consisting of concatenated meaningful standard audiology sentences, and longer fragments taken from conversational speech. We included conversational speech as this type of speech material is most representative of everyday listening. Additionally, we investigated whether ANL outcomes, obtained with these three different speech materials, were associated with self-reported limitations due to hearing problems and listening effort in everyday life, as assessed by a questionnaire. ANL data were collected for 57 relatively good-hearing adult participants with an age range representative for hearing aid users. Results showed that meaningfulness, but not semantic coherence of the speech material affected ANL. Less noise was accepted for the non-meaningful ISTS signal than for the meaningful speech materials. ANL repeatability was comparable across

  2. MAC mini acceptance test procedures, software Version 3.3

    SciTech Connect

    Russell, V.K.

    1994-10-17

    The K Basins Materials Accounting (MAC) programs had some improvements made to it to to change slightly the access authorized users had to the modification of critical data. This ATP describes how the code was to be tested to verify its correctness.

  3. General Mission Analysis Tool (GMAT) Acceptance Test Plan [Draft

    NASA Technical Reports Server (NTRS)

    Dove, Edwin; Hughes, Steve

    2007-01-01

    The information presented in this Acceptance Test Plan document shows the current status of the General Mission Analysis Tool (GMAT). GMAT is a software system developed by NASA Goddard Space Flight Center (GSFC) in collaboration with the private sector. The GMAT development team continuously performs acceptance tests in order to verify that the software continues to operate properly after updates are made. The GMAT Development team consists of NASA/GSFC Code 583 software developers, NASA/GSFC Code 595 analysts, and contractors of varying professions. GMAT was developed to provide a development approach that maintains involvement from the private sector and academia, encourages collaborative funding from multiple government agencies and the private sector, and promotes the transfer of technology from government funded research to the private sector. GMAT contains many capabilities, such as integrated formation flying modeling and MATLAB compatibility. The propagation capabilities in GMAT allow for fully coupled dynamics modeling of multiple spacecraft, in any flight regime. Other capabilities in GMAT inclucle: user definable coordinate systems, 3-D graphics in any coordinate system GMAT can calculate, 2-D plots, branch commands, solvers, optimizers, GMAT functions, planetary ephemeris sources including DE405, DE200, SLP and analytic models, script events, impulsive and finite maneuver models, and many more. GMAT runs on Windows, Mac, and Linux platforms. Both the Graphical User Interface (GUI) and the GMAT engine were built and tested on all of the mentioned platforms. GMAT was designed for intuitive use from both the GUI and with an importable script language similar to that of MATLAB.

  4. Type of Speech Material Affects Acceptable Noise Level Test Outcome

    PubMed Central

    Koch, Xaver; Dingemanse, Gertjan; Goedegebure, André; Janse, Esther

    2016-01-01

    The acceptable noise level (ANL) test, in which individuals indicate what level of noise they are willing to put up with while following speech, has been used to guide hearing aid fitting decisions and has been found to relate to prospective hearing aid use. Unlike objective measures of speech perception ability, ANL outcome is not related to individual hearing loss or age, but rather reflects an individual’s inherent acceptance of competing noise while listening to speech. As such, the measure may predict aspects of hearing aid success. Crucially, however, recent studies have questioned its repeatability (test–retest reliability). The first question for this study was whether the inconsistent results regarding the repeatability of the ANL test may be due to differences in speech material types used in previous studies. Second, it is unclear whether meaningfulness and semantic coherence of the speech modify ANL outcome. To investigate these questions, we compared ANLs obtained with three types of materials: the International Speech Test Signal (ISTS), which is non-meaningful and semantically non-coherent by definition, passages consisting of concatenated meaningful standard audiology sentences, and longer fragments taken from conversational speech. We included conversational speech as this type of speech material is most representative of everyday listening. Additionally, we investigated whether ANL outcomes, obtained with these three different speech materials, were associated with self-reported limitations due to hearing problems and listening effort in everyday life, as assessed by a questionnaire. ANL data were collected for 57 relatively good-hearing adult participants with an age range representative for hearing aid users. Results showed that meaningfulness, but not semantic coherence of the speech material affected ANL. Less noise was accepted for the non-meaningful ISTS signal than for the meaningful speech materials. ANL repeatability was comparable

  5. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid P

    SciTech Connect

    KOCH, M.R.

    2000-03-29

    This Acceptance Test Report (ATR) provides the test results for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''P''. The ATR summaries the results and provides a copy of the ATP and inspections in the Appendix.

  6. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid Q

    SciTech Connect

    KOCH, M.R.

    2000-05-11

    This Acceptance Test Report (ATR) provides the test results for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''Q''. The ATR summaries the results and provides a copy of the ATP and inspections in the Appendix.

  7. MBA acceptance test procedures, software Version 1.4

    SciTech Connect

    Mullaney, J.E.; Russell, V.K.

    1994-10-17

    The Mass Balance Program (MBA) is an adjunct to the Materials Accounting database system, Version 3.4. MBA was written to equip the personnel performing K-Basin encapsulation tasks with a conservative estimate of accumulated sludge during the processing of canisters into and out of the chute. The K Basins Materials Balance programs had some minor improvements made to it to feedback the chute processing status to the operator better. This ATP describes how the code was to be tested to verify its correctness.

  8. Project B610 process control configuration acceptance test report

    SciTech Connect

    Silvan, G.R.

    1995-06-27

    The purpose of this test is to verify the Westinghouse configuration of the MICON A/S Distributed Control System for project B610. The following will be verified: (1) proper assignment and operation of all field inputs to and outputs from the MICON Termination panels; (2) proper operation of all display data on the operators` console; (3) proper operation of all required alarms; and (4) proper operation of all required interlocks. This test only verifies the proper operation of the Westinghouse control configuration (or program). It will not be responsible for verifying proper operation of the MICON hardware or operating software. Neither does it test any of the B610 instrument. The MICON hardware and software has been tested as part of the equipment procurement. Instrumentation and wiring installed under project B620 will be tested under a separate functional test. In some cases, precise transmitter ranges, alarm setpoints, and controller tuning parameters are not available at this time. Therefore, approximate values are used during the test. This should not affect the proper operation of the configuration or the validity of this test. Final values will be assigned during operability testing.

  9. CSI computer system/remote interface unit acceptance test results

    NASA Technical Reports Server (NTRS)

    Sparks, Dean W., Jr.

    1992-01-01

    The validation tests conducted on the Control/Structures Interaction (CSI) Computer System (CCS)/Remote Interface Unit (RIU) is discussed. The CCS/RIU consists of a commercially available, Langley Research Center (LaRC) programmed, space flight qualified computer and a flight data acquisition and filtering computer, developed at LaRC. The tests were performed in the Space Structures Research Laboratory (SSRL) and included open loop excitation, closed loop control, safing, RIU digital filtering, and RIU stand alone testing with the CSI Evolutionary Model (CEM) Phase-0 testbed. The test results indicated that the CCS/RIU system is comparable to ground based systems in performing real-time control-structure experiments.

  10. Manipulator comparative testing program

    SciTech Connect

    Draper, J.V.; Handel, S.J.; Sundstrom, E.; Herndon, J.N.; Fujita, Y.; Maida, M.

    1986-01-01

    The Manipulator Comparative Testing Program compared performance of selected manipulator systems under typical remote handling conditions. The site of testing was the Remote Operations and Maintenance Demonstration Facility operated by the Consolidated Fuel Reprocessing Program of the Oak Ridge National Laboratory. Three experiment examined differences among manipulator systems from the US and Japan. The manipulator systems included the Meidensha BILARM 83A, Central Research Laboratories' (CRL's) Model M-2, and GCA PaR systems Model 6000. Six manipulator and control mode combinations were evaluated: (a) the BILARM in master-slave mode without force reflection; (b) the BILARM in master-slave mode with force reflection; (c) the Model M-2 in master-slave mode without force reflection; (d) the Model M-2 in master-slave mode with force reflection; (e) the BILARM with switchbox controls; and (f) the PaR 6000 with switchbox controls. The experiments also examined differences between master-slave systems with and without force reflections, and differences between master-slave systems and switchbox-controlled systems.

  11. Feasibility and Acceptability of a Text Messaging Program for Smoking Cessation in Israel.

    PubMed

    Abroms, Lorien; Hershcovitz, Ronit; Boal, Ashley; Levine, Hagai

    2015-08-01

    Text messaging programs on mobile phones have been shown to promote smoking cessation. This study investigated whether a text-messaging program for smoking cessation, adapted from QuitNowTXT, is feasible in Israel and acceptable to Israeli smokers. Participants (N = 38) were given a baseline assessment, enrolled in the adapted text messaging program, and followed-up with at 2 weeks and 4 weeks after their quit date. The authors used an intent-to-treat analysis and found that 23.7% of participants reported having quit smoking at the 4-week follow-up. Participants sent an average of 12.9 text replies during the study period, and the majority reported reading most or all of the texts. However, 34.2% of participants had unsubscribed by the 4-week follow-up. Moderate levels of satisfaction were reported; more than half agreed that they would recommend the program. Suggestions for improvement included adding advice by an expert counselor, website support, and increased customization. Results indicate that a text messaging smoking cessation program developed by modifying the content of QuitNowTXT is feasible and could be acceptable to smokers in Israel. The experience adapting and pilot testing the program can serve as a model for using QuitNowTXT to develop and implement such programs in other countries. PMID:25996261

  12. Development of a conversion program to make SIMIND-generated SPECT data interfile acceptable to Xeleris.

    PubMed

    Pandey, Anil K; Kumar, Jay P; Aheer, Deepak; Sharma, Anshul; Hasan, Binish; Patel, Chetan; Bal, Chandra S; Kumar, Rakesh

    2015-12-01

    The Monte Carlo code SIMIND is used in nuclear medicine for research purposes, and also for testing the validity of various applications. Conversion of a SIMIND-generated interfile (header and image data file) is required to process the simulated image data on a Xeleris workstation. Currently there is no conversion program provided with SIMIND to convert its interfile, which is acceptable in any nuclear medicine workstation. Manual editing of the header file is possible with any standard text editor but it is time-consuming (requiring ∼1 h) and stressful. To alleviate this, we have developed a conversion program using FreeMat V4.0 (an open source software similar to MATLAB from MathWorks). It takes an average of 0.04404 s to convert a SIMIND SPECT data interfile and make it acceptable to Xeleris. PMID:26426970

  13. ISOLOK VALVE ACCEPTANCE TESTING FOR DWPF SME SAMPLING PROCESS

    SciTech Connect

    Edwards, T.; Hera, K.; Coleman, C.; Jones, M.; Wiedenman, B.

    2011-12-05

    Evaluation of the Defense Waste Processing Facility (DWPF) Chemical Process Cell (CPC) cycle time identified several opportunities to improve the CPC processing time. Of the opportunities, a focus area related to optimizing the equipment and efficiency of the sample turnaround time for DWPF Analytical Laboratory was identified. The Mechanical Systems & Custom Equipment Development (MS&CED) Section of the Savannah River National Laboratory (SRNL) evaluated the possibility of using an Isolok{reg_sign} sampling valve as an alternative to the Hydragard{reg_sign} valve for taking process samples. Previous viability testing was conducted with favorable results using the Isolok sampler and reported in SRNL-STI-2010-00749 (1). This task has the potential to improve operability, reduce maintenance time and decrease CPC cycle time. This report summarizes the results from acceptance testing which was requested in Task Technical Request (TTR) HLW-DWPF-TTR-2010-0036 (2) and which was conducted as outlined in Task Technical and Quality Assurance Plan (TTQAP) SRNL-RP-2011-00145 (3). The Isolok to be tested is the same model which was tested, qualified, and installed in the Sludge Receipt Adjustment Tank (SRAT) sample system. RW-0333P QA requirements apply to this task. This task was to qualify the Isolok sampler for use in the DWPF Slurry Mix Evaporator (SME) sampling process. The Hydragard, which is the current baseline sampling method, was used for comparison to the Isolok sampling data. The Isolok sampler is an air powered grab sampler used to 'pull' a sample volume from a process line. The operation of the sampler is shown in Figure 1. The image on the left shows the Isolok's spool extended into the process line and the image on the right shows the sampler retracted and then dispensing the liquid into the sampling container. To determine tank homogeneity, a Coliwasa sampler was used to grab samples at a high and low location within the mixing tank. Data from the two locations

  14. Overcoming Denial through the Group: A Test of Acceptance Theory.

    ERIC Educational Resources Information Center

    Rugel, Robert P.; Barry, Denise

    1990-01-01

    Found participants (N=28) in alcohol treatment groups showed decreases in denial of drinking problems and decreases in psychopathology following 12 weeks of group counseling. Determined greater self-acceptance was associated with experiencing acceptance by group and with greater decreases in denial; decreases in denial and psychopathology were…

  15. 40 CFR 72.71 - Acceptance of State Acid Rain programs-general.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 17 2014-07-01 2014-07-01 false Acceptance of State Acid Rain programs... PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Phase II Implementation § 72.71 Acceptance of State Acid... State Acid Rain program meeting the requirements of §§ 72.72 and 72.73. (b) The Administrator...

  16. 40 CFR 72.71 - Acceptance of State Acid Rain programs-general.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 17 2013-07-01 2013-07-01 false Acceptance of State Acid Rain programs... PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Phase II Implementation § 72.71 Acceptance of State Acid... State Acid Rain program meeting the requirements of §§ 72.72 and 72.73. (b) The Administrator...

  17. 40 CFR 72.71 - Acceptance of State Acid Rain programs-general.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 16 2011-07-01 2011-07-01 false Acceptance of State Acid Rain programs... PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Phase II Implementation § 72.71 Acceptance of State Acid... State Acid Rain program meeting the requirements of §§ 72.72 and 72.73. (b) The Administrator...

  18. 40 CFR 72.71 - Acceptance of State Acid Rain programs-general.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 17 2012-07-01 2012-07-01 false Acceptance of State Acid Rain programs... PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Phase II Implementation § 72.71 Acceptance of State Acid... State Acid Rain program meeting the requirements of §§ 72.72 and 72.73. (b) The Administrator...

  19. Acceptance test procedure for the 105-KW isolation barrier leak rate

    SciTech Connect

    McCracken, K.J.

    1995-05-19

    This acceptance test procedure shall be used to: First establish a basin water loss rate prior to installation of the two isolation barriers between the main basin and the discharge chute in K-Basin West. Second, perform an acceptance test to verify an acceptable leakage rate through the barrier seals. This Acceptance Test Procedure (ATP) has been prepared in accordance with CM-6-1 EP 4.2, Standard Engineering Practices.

  20. Electric power system test and verification program

    NASA Technical Reports Server (NTRS)

    Rylicki, Daniel S.; Robinson, Frank, Jr.

    1994-01-01

    Space Station Freedom's (SSF's) electric power system (EPS) hardware and software verification is performed at all levels of integration, from components to assembly and system level tests. Careful planning is essential to ensure the EPS is tested properly on the ground prior to launch. The results of the test performed on breadboard model hardware and analyses completed to date have been evaluated and used to plan for design qualification and flight acceptance test phases. These results and plans indicate the verification program for SSF's 75-kW EPS would have been successful and completed in time to support the scheduled first element launch.

  1. 46 CFR 54.05-17 - Weld toughness test acceptance criteria.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... PRESSURE VESSELS Toughness Tests § 54.05-17 Weld toughness test acceptance criteria. (a) For Charpy V-notch impact tests the energy absorbed in both the weld metal and heat affected zone impact tests in weld... 46 Shipping 2 2012-10-01 2012-10-01 false Weld toughness test acceptance criteria....

  2. 46 CFR 54.05-17 - Weld toughness test acceptance criteria.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... PRESSURE VESSELS Toughness Tests § 54.05-17 Weld toughness test acceptance criteria. (a) For Charpy V-notch impact tests the energy absorbed in both the weld metal and heat affected zone impact tests in weld... 46 Shipping 2 2014-10-01 2014-10-01 false Weld toughness test acceptance criteria....

  3. 46 CFR 54.05-17 - Weld toughness test acceptance criteria.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... PRESSURE VESSELS Toughness Tests § 54.05-17 Weld toughness test acceptance criteria. (a) For Charpy V-notch impact tests the energy absorbed in both the weld metal and heat affected zone impact tests in weld... 46 Shipping 2 2013-10-01 2013-10-01 false Weld toughness test acceptance criteria....

  4. 49 CFR 232.505 - Pre-revenue service acceptance testing plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Pre-revenue service acceptance testing plan. 232... § 232.505 Pre-revenue service acceptance testing plan. (a) General; submission of plan. Except as... its system the operating railroad or railroads shall submit a pre-revenue service acceptance...

  5. Acceptance Test Report for the 241-AZ-101 Ultrasonic Interface Level Analyzer

    SciTech Connect

    ANDREWS, J.E.

    2000-01-27

    This document comprises the Acceptance Test Report for the 241-AZ-101 Ultrasonic Interface Level Analyzer. This document presents the results of Acceptance Testing of the 241-AZ-101 Ultrasonic Interface Level Analyzers (URSILLAs). Testing of the URSILLAs was performed in accordance with ATP-260-001, ''URSILLA Pre-installation Acceptance Test Procedure''. The objective of the testing was to verify that all equipment and components function in accordance with design specifications and original equipment manufacturer's specifications.

  6. Strapdown gyro test program

    NASA Technical Reports Server (NTRS)

    Irvine, R. B.; Vanalstine, R.

    1977-01-01

    The power spectral noise characteristic performance of the Teledyne two-degree-of-freedom dry tuned gimbal gyroscope was determined. Tests were conducted using a current configuration SDG-5 gyro in conjunction with test equipment with minor modification. Long term bias stability tests were conducted as well as some first difference performance tests. The gyro, test equipment, and the tests performed are described. Results are presented.

  7. Achievement Test Program.

    ERIC Educational Resources Information Center

    Ohio State Dept. of Education, Columbus. Trade and Industrial Education Service.

    The Ohio Trade and Industrial Education Achievement Test battery is comprised of seven basic achievement tests: Machine Trades, Automotive Mechanics, Basic Electricity, Basic Electronics, Mechanical Drafting, Printing, and Sheet Metal. The tests were developed by subject matter committees and specialists in testing and research. The Ohio Trade and…

  8. 40 CFR 72.71 - Acceptance of State Acid Rain programs-general.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Acceptance of State Acid Rain programs-general. 72.71 Section 72.71 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Phase II Implementation § 72.71 Acceptance of State Acid Rain programs—general. (a) Each...

  9. Peer Acceptance and Social Skill Training: The Selection of Program Content.

    ERIC Educational Resources Information Center

    Asher, Steven R.; And Others

    This article reviews literature on peer acceptance of children and briefly discusses a study of the social skill correlates of peer acceptance. The importance of being able to form friendships for the child's later development and the importance of programs which maximize this ability are noted. There is a review of literature on programs which…

  10. Biological and chemical tests of contaminated soils to determine bioavailability and environmentally acceptable endpoints (EAE)

    SciTech Connect

    Montgomery, C.R.; Menzie, C.A.; Pauwells, S.J.

    1995-12-31

    The understanding of the concept of bioavailability of soil contaminants to receptors and its use in supporting the development of EAE is growing but still incomplete. Nonetheless, there is increased awareness of the importance of such data to determine acceptable cleanup levels and achieve timely site closures. This presentation discusses a framework for biological and chemical testing of contaminated soils developed as part of a Gas Research Institute (GRI) project entitled ``Environmentally Acceptable Endpoints in Soil Using a Risk Based Approach to Contaminated Site Management Based on Bioavailability of Chemicals in Soil.`` The presentation reviews the GRI program, and summarizes the findings of the biological and chemical testing section published in the GRI report. The three primary components of the presentation are: (1) defining the concept of bioavailability within the existing risk assessment paradigm, (2) assessing the usefulness of the existing tests to measure bioavailability and test frameworks used to interpret these measurements, and (3) suggesting how a small selection of relevant tests could be incorporated into a flexible testing scheme for soils to address this issue.

  11. Student Acceptance of Videodisk-Based Programs for Paramedical Training.

    ERIC Educational Resources Information Center

    Manning, D. Thompson; And Others

    1983-01-01

    Describes an interactive videodisc application program developed to train army medics. Indicates that reduced instructor teaching time and a high degree of student satisfaction in mastering complex, high-stress tasks are the optimum results achieved by the program. (JN)

  12. USEPA SITE PROGRAM APPROACH TO TECHNOLOGY TRANSFER AND REGULATORY ACCEPTANCE

    EPA Science Inventory

    The SITE Program was created to meet the increased demand for innovative technologies for hazardous waste treatment. To accomplish this mission, the program seeks to advance the development, implementation and commercialization of innovative technologies for hazardous waste chara...

  13. Thermocouple module halt acceptance test report for tank 241-SY-101 DACS-1

    SciTech Connect

    Larsen, D.C.

    1998-03-10

    Testing was started on February 24, 1998 and completed on February 25, 1998. The completed procedure consists of 4 acceptance test sections, 6.1 through 6.4. Three test exceptions were identified during the procedure. The first test exception was determined to be unrelated to the ATP and unfortunate that the instrument failed during the ATP. The next two test exceptions were disposition as acceptable because the alarming functions worked correctly in identifying a problem when software communications were interrupted. The test was completed satisfactorily over 2 days. The remainder of the acceptance test report is the completed test procedure.

  14. 78 FR 53484 - Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 4

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-29

    ... COMMISSION Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 4... acceptance criteria (ITAAC) completion. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) staff has... acceptance criteria are met for ITAAC E.2.5.04.05.05.02, for the Vogtle Electric Generating Plant, Unit...

  15. 78 FR 53483 - Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 3

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-29

    ... COMMISSION Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 3... acceptance criteria (ITAAC) completion. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) staff has... acceptance criteria are met for ITAAC E.2.5.04.05.05.02, for the Vogtle Electric Generating Plant, Unit...

  16. Acceptance and operability test report for the 327 building retention process sewer diverter station

    SciTech Connect

    Olander, A.R.

    1996-09-04

    This test report includes the results of acceptance and operability testing of the 327 building diverter station. The test included steps for flushing, calibrating, and operating the system on backup power.

  17. Cassini RTG acceptance test results and RTG performance on Galileo and Ulysses

    SciTech Connect

    Kelly, C.E.; Klee, P.M.

    1997-06-01

    Flight acceptance testing has been completed for the RTGs to be used on the Cassini spacecraft which is scheduled for an October 6, 1997 launch to Saturn. The acceptance test program includes vibration tests, magnetic field measurements, properties (weight and c.g.) and thermal vacuum test. This paper presents The thermal vacuum test results. Three RTGs are to be used, F-2, F-6, and F-7. F-5 is tile back-up RTG, as it was for the Galileo and Ulysses missions launched in 1989 and 1990, respectively. RTG performance measured during the thermal vacuum tests carried out at die Mound Laboratory facility met all specification requirements. Beginning of mission (BOM) and end of mission (EOM) power predictions have been made based on than tests results. BOM power is predicted to be 888 watts compared to the minimum requirement of 826 watts. Degradation models predict the EOM power after 16 years is to be 640 watts compared to a minimum requirement of 596 watts. Results of small scale module tests are also showing. The modules contain couples from the qualification and flight production runs. The tests have exceeded 28,000 hours (3.2 years) and are continuing to provide increased confidence in the predicted long term performance of the Cassini RTGs. All test results indicate that the power requirements of the Cassini spacecraft will be met. BOM and EOM power margins of over five percent are predicted. Power output from telemetry for the two Galileo RTGs are shown from the 1989 launch to the recent Jupiter encounter. Comparisons of predicted, measured and required performance are shown. Telemetry data are also shown for the RTG on the Ulysses spacecraft which completed its planned mission in 1995 and is now in the extended mission.

  18. Cassini RTG acceptance test results and RTG performance on Galileo and Ulysses

    SciTech Connect

    Kelly, C.E.; Klee, P.M.

    1997-12-31

    Flight acceptance testing has been completed for the RTGs to be used on the Cassini spacecraft which is scheduled for an October 6, 1997 launch to Saturn. The acceptance test program includes vibration tests, magnetic field measurements, mass properties (weight and c.g.) and thermal vacuum test. This paper presents the thermal vacuum test results. Three RTGs are to be used, F-2, F-6, and F-7. F-5 is the backup RTG, as it was for the Galileo and Ulysses missions launched in 1989 and 1990, respectively. RTG performance measured during the thermal vacuum tests carried out at the Mound Laboratory facility met all specification requirements. Beginning of mission (BOM) and end of mission (EOM) power predictions have been made based on these tests results. BOM power is predicted to be 888 watts compared to the minimum requirement of 826 watts. Degradation models predict the EOM power after 16 years is to be 640 watts compared to a minimum requirement of 596 watts. Results of small scale module tests are also shown. The modules contain couples from the qualification and flight production runs. The tests have exceeded 28,000 hours (3.2 years) and are continuing to provide increased confidence in the predicted long term performance of the Cassini RTGs. All test results indicate that the power requirements of the Cassini spacecraft will be met. BOM and EOM power margins of over 5% are predicted. Power output from telemetry for the two Galileo RTGs are shown from the 1989 launch to the recent Jupiter encounter. Comparisons of predicted, measured and required performance are shown. Telemetry data are also shown for the RTG on the Ulysses spacecraft which completed its planned mission in 1995 and is now in the extended mission.

  19. Cassini RTG Acceptance Test Results and RTG Performance on Galileo and Ulysses

    DOE R&D Accomplishments Database

    Kelly, C. E.; Klee, P. M.

    1997-06-01

    Flight acceptance testing has been completed for the RTGs to be used on the Cassini spacecraft which is scheduled for an October 6, 1997 launch to Saturn. The acceptance test program includes vibration tests, magnetic field measurements, properties (weight and c.g.) and thermal vacuum test. This paper presents The thermal vacuum test results. Three RTGs are to be used, F 2, F 6, and F 7. F 5 is tile back up RTG, as it was for the Galileo and Ulysses missions launched in 1989 and 1990, respectively. RTG performance measured during the thermal vacuum tests carried out at die Mound Laboratory facility met all specification requirements. Beginning of mission (BOM) and end of mission (EOM) power predictions have been made based on than tests results. BOM power is predicted to be 888 watts compared to the minimum requirement of 826 watts. Degradation models predict the EOM power after 16 years is to be 640 watts compared to a minimum requirement of 596 watts. Results of small scale module tests are also showing. The modules contain couples from the qualification and flight production runs. The tests have exceeded 28,000 hours (3.2 years) and are continuing to provide increased confidence in the predicted long term performance of the Cassini RTGs. All test results indicate that the power requirements of the Cassini spacecraft will be met. BOM and EOM power margins of over five percent are predicted. Power output from telemetry for the two Galileo RTGs are shown from the 1989 launch to the recent Jupiter encounter. Comparisons of predicted, measured and required performance are shown. Telemetry data are also shown for the RTG on the Ulysses spacecraft which completed its planned mission in 1995 and is now in the extended mission.

  20. W-026, acceptance test report fire alarm system (submittal number 1571.1)

    SciTech Connect

    Watson, T.L., Westinghouse Hanford

    1996-12-16

    This Acceptance Test Report was written by 3-D Protection Systems, Inc., and PCL Construction. WRAP I Facility Engineering, Solid Waste Fire Safety, Kaiser Acceptance Inspector and Hanford Fire Department personnel witnessed this test. All exceptions were resolved. The resolutions are attached. Contractor`s Material and Test Certificates are attached. Results from Solid Waste Industrial Hygiene sound level surveys are also included.

  1. 46 CFR 54.05-17 - Weld toughness test acceptance criteria.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Weld toughness test acceptance criteria. 54.05-17 Section 54.05-17 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PRESSURE VESSELS Toughness Tests § 54.05-17 Weld toughness test acceptance criteria. (a) For Charpy...

  2. 46 CFR 54.05-17 - Weld toughness test acceptance criteria.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 2 2011-10-01 2011-10-01 false Weld toughness test acceptance criteria. 54.05-17 Section 54.05-17 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PRESSURE VESSELS Toughness Tests § 54.05-17 Weld toughness test acceptance criteria. (a) For Charpy...

  3. PDSS/IMC qualification test software acceptance procedures

    NASA Technical Reports Server (NTRS)

    1984-01-01

    Tests to be performed for qualifying the payload development support system image motion compensator (IMC) are identified. The performance of these tests will verify the IMC interfaces and thereby verify the qualification test software.

  4. Acceptability and Effect of a Community-Based Alcohol Education Program in Rural Sri Lanka

    PubMed Central

    Siriwardhana, P.; Dawson, A.H.; Abeyasinge, R.

    2013-01-01

    Aims: To assess the effectiveness and acceptability of a brief community-based educational program on changing the drinking pattern of alcohol in a rural community. Methods: A longitudinal cohort study was carried out in two rural villages in Sri Lanka. One randomly selected village received a community education program that utilized street dramas, poster campaigns, leaflets and individual and group discussions. The control village had no intervention during this period. The Alcohol Use Disorder Identification Test (AUDIT) was used to measure the drinking pattern before and at 6 and 24 months after the intervention in males over 18 years of age in both villages. The recall and the impact of various components of the intervention were assessed at 24 months post-intervention. Results: The intervention was associated with the development of an active community action group in the village and a significant reduction in illicit alcohol outlets. The drama component of the intervention had the highest level of recall and preference. Comparing the control and intervention villages, there were no significant difference between baseline drinking patterns and the AUDIT. There was a significant reduction in the AUDIT scores in the intervention village compared with the control at 6 and 24 months (P < 0.0001). Conclusions: A community-based education program had high acceptance and produces a reduction in alcohol use that was sustained for 2 years. PMID:23161893

  5. Space Suit Portable Life Support System (PLSS) 2.0 Pre-Installation Acceptance (PIA) Testing

    NASA Technical Reports Server (NTRS)

    Watts, Carly; Vogel, Matthew

    2016-01-01

    Following successful completion of the space suit Portable Life Support System (PLSS) 1.0 development and testing in 2011, the second system-level prototype, PLSS 2.0, was developed in 2012 to continue the maturation of the advanced PLSS design which is intended to reduce consumables, improve reliability and robustness, and incorporate additional sensing and functional capabilities over the current Space Shuttle/International Space Station Extravehicular Mobility Unit (EMU) PLSS. PLSS 2.0 represents the first attempt at a packaged design comprising first generation or later component prototypes and medium fidelity interfaces within a flight-like representative volume. Pre-Installation Acceptance (PIA) is carryover terminology from the Space Shuttle Program referring to the series of test sequences used to verify functionality of the EMU PLSS prior to installation into the Space Shuttle airlock for launch. As applied to the PLSS 2.0 development and testing effort, PIA testing designated the series of 27 independent test sequences devised to verify component and subsystem functionality, perform in situ instrument calibrations, generate mapping data to define set-points for control algorithms, evaluate hardware performance against advanced PLSS design requirements, and provide quantitative and qualitative feedback on evolving design requirements and performance specifications. PLSS 2.0 PIA testing was carried out from 3/20/13 - 3/15/14 using a variety of test configurations to perform test sequences that ranged from stand-alone component testing to system-level testing, with evaluations becoming increasingly integrated as the test series progressed. Each of the 27 test sequences was vetted independently, with verification of basic functionality required before completion. Because PLSS 2.0 design requirements were evolving concurrently with PLSS 2.0 PIA testing, the requirements were used as guidelines to assess performance during the tests; after the completion of PIA

  6. Space Suit Portable Life Support System (PLSS) 2.0 Pre-Installation Acceptance (PIA) Testing

    NASA Technical Reports Server (NTRS)

    Anchondo, Ian; Cox, Marlon; Meginnis, Carly; Westheimer, David; Vogel, Matt R.

    2016-01-01

    Following successful completion of the space suit Portable Life Support System (PLSS) 1.0 development and testing in 2011, the second system-level prototype, PLSS 2.0, was developed in 2012 to continue the maturation of the advanced PLSS design. This advanced PLSS is intended to reduce consumables, improve reliability and robustness, and incorporate additional sensing and functional capabilities over the current Space Shuttle/International Space Station Extravehicular Mobility Unit (EMU) PLSS. PLSS 2.0 represents the first attempt at a packaged design comprising first generation or later component prototypes and medium fidelity interfaces within a flight-like representative volume. Pre-Installation Acceptance (PIA) is carryover terminology from the Space Shuttle Program referring to the series of test sequences used to verify functionality of the EMU PLSS prior to installation into the Space Shuttle airlock for launch. As applied to the PLSS 2.0 development and testing effort, PIA testing designated the series of 27 independent test sequences devised to verify component and subsystem functionality, perform in situ instrument calibrations, generate mapping data, define set-points, evaluate control algorithms, evaluate hardware performance against advanced PLSS design requirements, and provide quantitative and qualitative feedback on evolving design requirements and performance specifications. PLSS 2.0 PIA testing was carried out in 2013 and 2014 using a variety of test configurations to perform test sequences that ranged from stand-alone component testing to system-level testing, with evaluations becoming increasingly integrated as the test series progressed. Each of the 27 test sequences was vetted independently, with verification of basic functionality required before completion. Because PLSS 2.0 design requirements were evolving concurrently with PLSS 2.0 PIA testing, the requirements were used as guidelines to assess performance during the tests; after the

  7. Preliminary Assessment of the Hanford Tank Waste Feed Acceptance and Product Qualification Programs

    SciTech Connect

    Herman, C. C.; Adamson, Duane J.; Herman, D. T.; Peeler, David K.; Poirier, Micheal R.; Reboul, S. H.; Stone, M. E.; Peterson, Reid A.; Chun, Jaehun; Fort, James A.; Vienna, John D.; Wells, Beric E.

    2013-04-01

    The U.S. Department of Energy Office of Environmental Management (EM) is engaging the national laboratories to provide the scientific and technological rigor to support EM program and project planning, technology development and deployment, project execution, and assessment of program outcomes. As an early demonstration of this new responsibility, Savannah River National Laboratory (SRNL) and Pacific Northwest National Laboratory (PNNL) have been chartered to implement a science and technology program addressing Hanford Tank waste feed acceptance and product qualification. As a first step, the laboratories examined the technical risks and uncertainties associated with the planned waste feed acceptance and qualification testing for Hanford tank wastes. Science and technology gaps were identified for work associated with 1) feed criteria development with emphasis on identifying the feed properties and the process requirements, 2) the Tank Waste Treatment and Immobilization Plant (WTP) process qualification program, and 3) the WTP HLW glass product qualification program. Opportunities for streamlining the accetpance and qualification programs were also considered in the gap assessment. Technical approaches to address the science and technology gaps and/or implement the opportunities were identified. These approaches will be further refined and developed as strong integrated teams of researchers from national laboratories, contractors, industry, and academia are brought together to provide the best science and technology solutions. Pursuing the identified approaches will have immediate and long-term benefits to DOE in reducing risks and uncertainties associated with tank waste removal and preparation, transfers from the tank farm to the WTP, processing within the WTP Pretreatment Facility, and in producing qualified HLW glass products. Additionally, implementation of the identified opportunities provides the potential for long-term cost savings given the anticipated

  8. Newell Truck Stop Testing Program.

    ERIC Educational Resources Information Center

    Frey, Marlin L.

    A unique program for providing General Educational Development (GED) diploma testing is described in this document which includes a brief description of the program, a press release, and a brochure. The program, developed by the Newton, Kansas, Unified School District No. 373, is intended to encourage truck drivers to get their diplomas by…

  9. Effectiveness of spacecraft testing programs

    NASA Technical Reports Server (NTRS)

    Krausz, A.

    1980-01-01

    The need for testing under simulated mission operational conditions is discussed and the results of such tests are reviewed from the point of view of the user. A brief overview of the usal test sequences for high reliability long life spacecraft is presented and the effectiveness of the testing program is analyzed in terms of the defects which are discovered by such tests. The need for automation, innovative mechanical test procedures, and design for testability is discussed.

  10. The television, school, and family project. V. The impact of curriculum delivery format on program acceptance.

    PubMed

    Brannon, B R; Dent, C W; Flay, B R; Smith, G; Sussman, S; Pentz, M A; Johnson, C A; Hansen, W B

    1989-07-01

    Social psychological interventions have been successful in preventing drug and tobacco use in adolescents, but target audience involvement has not been well documented. Examination of program acceptance is necessary to avoid ambiguity when interpreting findings within and across studies. This report presents results from a program acceptance study of a seventh-grade smoking/drug-use prevention and cessation field trial. The research design is an assessment of two experimentally manipulated variations in program delivery on the program acceptance of all provider and target groups involved. Experimental manipulations included classroom and mass broadcast television demonstrations of social resistance skills against pressures to smoke and use drugs. Three aspects of target audience program acceptance were assessed: participation, satisfaction, and perceived program efficacy. Respondents included the target audience (seventh-grade students and parents), instructors, classroom observers, and school administrative staff. Strong main effects of television delivery on student and parent participation were observed. The findings suggest the usefulness of student homework assignment to view television segments with parents at home as a strategy to achieve family involvement in school-based programs. Both television and classroom delivery separately demonstrated significant positive effects on overall program acceptance with moderate interactive effects on perceived program efficacy. While classroom teacher/observers and school administrators reported strong preferences for the experimental (social resistance) classroom curriculum, acceptance of experimental and comparison (information-based) curricula by the student/parent target audience was equivalent. PMID:2798371

  11. DOE HEPA filter test program

    SciTech Connect

    1998-05-01

    This standard establishes essential elements of a Department of Energy (DOE) program for testing HEPA filters to be installed in DOE nuclear facilities or used in DOE-contracted activities. A key element is the testing of HEPA filters for performance at a DOE Filter Test Facility (FTF) prior to installation. Other key elements are (1) providing for a DOE HEPA filter procurement program, and (2) verifying that HEPA filters to be installed in nuclear facilities appear on a Qualified Products List (QPL).

  12. End User Acceptance - Requirements or Specifications, Certification, Testing

    NASA Technical Reports Server (NTRS)

    Jeevarajan, Judith

    2013-01-01

    NASA follows top level safety requirement of two-failure tolerance (t hree levels of controls or design for minimum risk) to all catastroph ic hazards in the design of safe li-ion batteries for space use. ? R igorous development testing at appropriate levels to credible offnominal conditions and review of test data. ? Implement robust design con trols based on test results and test again to confirm safety at the a ppropriate levels. ? Stringent testing of all (100%) flight batteries (from button cells to large batteries).

  13. 24 CFR 3282.360 - PIA acceptance of product certification programs or listings.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... under the standards set out in part 3280 of 24 CFR, all PIAs shall accept all product verification... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false PIA acceptance of product certification programs or listings. 3282.360 Section 3282.360 Housing and Urban Development Regulations...

  14. Afterschool Program Participation and the Development of Child Obesity and Peer Acceptance

    ERIC Educational Resources Information Center

    Mahoney, Joseph L.; Lord, Heather; Carryl, Erica

    2005-01-01

    This longitudinal study assessed the role of afterschool program (ASP) participation in the development of child obesity and peer acceptance in a sample of 439 children. Most participants lived in poverty and were Hispanic or African American. Measurements of height and weight determined obesity status and peer acceptance was assessed through…

  15. 49 CFR 238.111 - Pre-revenue service acceptance testing plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Pre-revenue service acceptance testing plan. 238... and General Requirements § 238.111 Pre-revenue service acceptance testing plan. (a) Passenger equipment that has previously been used in revenue service in the United States. For passenger...

  16. 49 CFR 238.111 - Pre-revenue service acceptance testing plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Pre-revenue service acceptance testing plan. 238.111 Section 238.111 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL... and General Requirements § 238.111 Pre-revenue service acceptance testing plan. (a)...

  17. 78 FR 65007 - Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 3

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-30

    ...The U.S. Nuclear Regulatory Commission (NRC) staff has determined that the inspections, tests, and analyses have been successfully completed, and that the specified acceptance criteria are met for Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC), 2.1.03.11 for the Vogtle Electric Generating Plant, Unit...

  18. Handheld Technology Acceptance in Radiologic Science Education and Training Programs

    ERIC Educational Resources Information Center

    Powers, Kevin Jay

    2012-01-01

    The purpose of this study was to explore the behavioral intention of directors of educational programs in the radiologic sciences to adopt handheld devices to aid in managing student clinical data. Handheld devices were described to participants as a technology representing a class of mobile electronic devices including, but not limited to,…

  19. 46 CFR 164.023-11 - Acceptance tests.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... identification tests are conducted: (1) The average length/weight ratio of the thread in meters per kilogram... analysis, thermogravimetric analysis, differential scanning calorimeter, or other equivalent means...

  20. Tank Monitoring and Control System (TMACS) Acceptance Test Procedure

    SciTech Connect

    BARNES, D.A.

    2000-06-01

    The purpose of this document is to describe tests performed to validate Revision 12.0 of the TMACS Monitor and Control System (TMACS) and verify that the software functions as intended by design. This document is intended to test the software portion of TMACS. The tests will be performed on the development system. The software to be tested is the TMACS knowledge bases (KB) and the I/O driver/services. The development system will not be communicating to field equipment; instead, the field equipment is simulated using emulators or multiplexers in the lab.

  1. Is the Triple P-Positive Parenting Program Acceptable to Parents from Culturally Diverse Backgrounds?

    ERIC Educational Resources Information Center

    Morawska, Alina; Sanders, Matthew; Goadby, Elizabeth; Headley, Clea; Hodge, Lauren; McAuliffe, Christine; Pope, Sue; Anderson, Emily

    2011-01-01

    Behavioural parenting programs are an effective intervention for behavioural and emotional problems in children, however these programs have low utilisation rates by culturally diverse parents. We examined the cultural acceptability of program materials, preferences for delivery methods, and barriers to use of the Triple P-Positive Parenting…

  2. Acceptance Test Procedure for New Pumping and Instrumentation Control Skid N

    SciTech Connect

    KOCH, M.R.

    1999-12-13

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''N''. The ATP will be performed after the construction of the PIC skid in the shop.

  3. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid Q

    SciTech Connect

    KOCH, M.R.

    2000-03-27

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''Q''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  4. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid W

    SciTech Connect

    KOCH, M.R.

    2000-05-18

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''W''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  5. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid T

    SciTech Connect

    KOCH, M.R.

    2000-05-18

    This Acceptance Test Procedure (ATP) provides for the inspection and testing Of the new Pumping Instrumentation and Control (PIC) skid designed as ''T''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  6. Acceptance Test Procedure for New Pumping and Instrumentation Control Skid L

    SciTech Connect

    KOCH, M.R.

    1999-10-11

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''L''. The ATP will be performed after the construction of the PIC skid in the shop.

  7. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid U

    SciTech Connect

    KOCH, M.R.

    2000-12-05

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''U''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  8. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid R

    SciTech Connect

    KOCH, M.R.

    2000-05-11

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''R''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  9. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid V

    SciTech Connect

    KOCH, M.R.

    2000-05-18

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control. (PIC) skid designed as ''V''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  10. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid T

    SciTech Connect

    KOCH, M.R.

    2000-06-20

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designated as ''T''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  11. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid P

    SciTech Connect

    KOCH, M.R.

    2000-03-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''P''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  12. Retrofit and acceptance test of 30-cm ion thrusters

    NASA Technical Reports Server (NTRS)

    Poeschel, R. L.

    1981-01-01

    Six 30 cm mercury thrusters were modified to the J-series design and evaluated using standardized test procedures. The thruster performance meets the design objectives (lifetime objective requires verification), and documentation (drawings, etc.) for the design is completed and upgraded. The retrofit modifications are described and the test data for the modifications are presented and discussed.

  13. 10 CFR 36.41 - Construction monitoring and acceptance testing.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... operation of the over-the-pool monitor, alarms, and interlocks required by § 36.29(b). (f) Source rack. For panoramic irradiators, the licensee shall test the movement of the source racks for proper operation prior to source loading; testing must include source rack lowering due to simulated loss of power. For...

  14. Acceptance test procedure for the MO-293 (1722) 10-wide mobile office

    SciTech Connect

    Wallace, S.C.

    1994-12-28

    This Acceptance Test Procedure has been prepared to demonstrate that the Fire Protection System functions as required by project criteria. The test results will be issued as an acceptance test report after all the testing is complete. This facility is part of the Spent Nuclear Fuel Project. An appendix is provided as a checklist of activities to be performed by the fire alarm system installer to ensure proper installation and operation.

  15. Waste retrieval sluicing system data acquisition system acceptance test report

    SciTech Connect

    Bevins, R.R.

    1998-07-31

    This document describes the test procedure for the Project W-320 Tank C-106 Sluicing Data Acquisition System (W-320 DAS). The Software Test portion will test items identified in the WRSS DAS System Description (SD), HNF-2115. Traceability to HNF-2115 will be via a reference that follows in parenthesis, after the test section title. The Field Test portion will test sensor operability, analog to digital conversion, and alarm setpoints for field instrumentation. The W-320 DAS supplies data to assist thermal modeling of tanks 241-C-106 and 241-AY-102. It is designed to be a central repository for information from sources that would otherwise have to be read, recorded, and integrated manually. Thus, completion of the DAS requires communication with several different data collection devices and output to a usable PC data formats. This test procedure will demonstrate that the DAS functions as required by the project requirements stated in Section 3 of the W-320 DAS System Description, HNF-2115.

  16. Tank Monitoring and Control Sys (TMACS) Acceptance Test Procedure

    SciTech Connect

    WANDLING, R.R.

    1999-11-08

    The purpose of this document is to describe tests performed to validate Revision 11.2 of the TMACS Monitor and Control System (TMCACS) and verify that the software functions as intended by design. The tests will be performed on the development system. The software to be tested is the TMACS knowledge bases (KB) and the I/O driver/services. The development system will not be talking to field equipment; instead, the field equipment is simulated using emulators or multiplexers in the lab.

  17. Feasibility and Acceptance of a Robotic Surgery Ergonomic Training Program

    PubMed Central

    Craven, Renatta; Mosaly, Prithima; Gehrig, Paola A.

    2014-01-01

    Background and Objectives: Assessment of ergonomic strain during robotic surgery indicates there is a need for intervention. However, limited data exist detailing the feasibility and acceptance of ergonomic training (ET) for robotic surgeons. This prospective, observational pilot study evaluates the implementation of an evidence-based ET module. Methods: A two-part survey was conducted. The first survey assessed robotic strain using the Nordic Musculoskeletal Questionnaire (NMQ). Participants were given the option to participate in either an online or an in-person ET session. The ET was derived from Occupational Safety and Health Administration guidelines and developed by a human factors engineer experienced with health care ergonomics. After ET, a follow-up survey including the NMQ and an assessment of the ET were completed. Results: The survey was sent to 67 robotic surgeons. Forty-two (62.7%) responded, including 18 residents, 8 fellows, and 16 attending physicians. Forty-five percent experienced strain resulting from performing robotic surgery and 26.3% reported persistent strain. Only 16.6% of surgeons reported prior ET in robotic surgery. Thirty-five (78%) surgeons elected to have in-person ET, which was successfully arranged for 32 surgeons (91.4%). Thirty-seven surgeons (88.1%) completed the follow-up survey. All surgeons participating in the in-person ET found it helpful and felt formal ET should be standard, 88% changed their practice as a result of the training, and 74% of those reporting strain noticed a decrease after their ET. Conclusion: Thus, at a high-volume robotics center, evidence-based ET was easily implemented, well-received, changed some surgeons' practice, and decreased self-reported strain related to robotic surgery. PMID:25489213

  18. Resolve! Version 2.5: Flammable Gas Accident Analysis Tool Acceptance Test Plan and Test Results

    SciTech Connect

    LAVENDER, J.C.

    2000-10-17

    RESOLVE! Version 2 .5 is designed to quantify the risk and uncertainty of combustion accidents in double-shell tanks (DSTs) and single-shell tanks (SSTs). The purpose of the acceptance testing is to ensure that all of the options and features of the computer code run; to verify that the calculated results are consistent with each other; and to evaluate the effects of the changes to the parameter values on the frequency and consequence trends associated with flammable gas deflagrations or detonations.

  19. Redstone Test Stand Accepted Into National Register of Historical Places

    NASA Technical Reports Server (NTRS)

    1976-01-01

    On October 02, 1976, Marshall Space Flight Center's (MSFC) Redstone test stand was received into the National Registry of Historical Places. Photographed in front of the Redstone test stand along with their wives are (left to right), Madison County Commission Chairman James Record, Dr. William R. Lucas, MSFC Center Director from June 15, 1974 until July 3, 1986, (holding certificate), Ed, Buckbee, Space and Rocket Center Director; Harvie Jones, Huntsville Architect; Dick Smith; and Joe Jones.

  20. Nevada Test Site closure program

    SciTech Connect

    Shenk, D.P.

    1994-08-01

    This report is a summary of the history, design and development, procurement, fabrication, installation and operation of the closures used as containment devices on underground nuclear tests at the Nevada Test Site. It also addresses the closure program mothball and start-up procedures. The Closure Program Document Index and equipment inventories, included as appendices, serve as location directories for future document reference and equipment use.

  1. Full-Scale Cask Testing and Public Acceptance of Spent Nuclear Fuel Shipments - 12254

    SciTech Connect

    Dilger, Fred; Halstead, Robert J.; Ballard, James D.

    2012-07-01

    Full-scale physical testing of spent fuel shipping casks has been proposed by the National Academy of Sciences (NAS) 2006 report on spent nuclear fuel transportation, and by the Presidential Blue Ribbon Commission (BRC) on America's Nuclear Future 2011 draft report. The U.S. Nuclear Regulatory Commission (NRC) in 2005 proposed full-scale testing of a rail cask, and considered 'regulatory limits' testing of both rail and truck casks (SRM SECY-05-0051). The recent U.S. Department of Energy (DOE) cancellation of the Yucca Mountain project, NRC evaluation of extended spent fuel storage (possibly beyond 60-120 years) before transportation, nuclear industry adoption of very large dual-purpose canisters for spent fuel storage and transport, and the deliberations of the BRC, will fundamentally change assumptions about the future spent fuel transportation system, and reopen the debate over shipping cask performance in severe accidents and acts of sabotage. This paper examines possible approaches to full-scale testing for enhancing public confidence in risk analyses, perception of risk, and acceptance of spent fuel shipments. The paper reviews the literature on public perception of spent nuclear fuel and nuclear waste transportation risks. We review and summarize opinion surveys sponsored by the State of Nevada over the past two decades, which show consistent patterns of concern among Nevada residents about health and safety impacts, and socioeconomic impacts such as reduced property values along likely transportation routes. We also review and summarize the large body of public opinion survey research on transportation concerns at regional and national levels. The paper reviews three past cask testing programs, the way in which these cask testing program results were portrayed in films and videos, and examines public and official responses to these three programs: the 1970's impact and fire testing of spent fuel truck casks at Sandia National Laboratories, the 1980's

  2. 10 CFR 36.41 - Construction monitoring and acceptance testing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    .... The licensee shall test the operability of the fire extinguishing system. (i) Source return. For...) Water handling system. For pool irradiators, the licensee shall verify that the water purification system, the conductivity meter, and the water level indicators operate properly. (e) Radiation...

  3. 10 CFR 36.41 - Construction monitoring and acceptance testing.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    .... The licensee shall test the operability of the fire extinguishing system. (i) Source return. For...) Water handling system. For pool irradiators, the licensee shall verify that the water purification system, the conductivity meter, and the water level indicators operate properly. (e) Radiation...

  4. 10 CFR 36.41 - Construction monitoring and acceptance testing.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... it functions as designed and that all alarms, controls, and interlocks work properly. (h) Fire protection. For panoramic irradiators, the licensee shall test the ability of the heat and smoke detectors to detect a fire, to activate alarms, and to cause the source rack to automatically become fully...

  5. 10 CFR 36.41 - Construction monitoring and acceptance testing.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... it functions as designed and that all alarms, controls, and interlocks work properly. (h) Fire protection. For panoramic irradiators, the licensee shall test the ability of the heat and smoke detectors to detect a fire, to activate alarms, and to cause the source rack to automatically become fully...

  6. Transient Pressure Test Article Test Program

    NASA Technical Reports Server (NTRS)

    Vibbart, Charles M.

    1989-01-01

    The Transient Pressure Test Article (TPTA) test program is being conducted at a new test facility located in the East Test Area at the National Aeronautics and Space Administration's (NASA's) Marshall Space Flight Center (MSFC) in Huntsville, Alabama. This facility, along with the special test equipment (STE) required for facility support, was constructed specifically to test and verify the sealing capability of the Redesigned Solid Rocket Motor (RSRM) field, igniter, and nozzle joints. The test article consists of full scale RSRM hardware loaded with inert propellant and assembled in a short stack configuration. The TPTA is pressurized by igniting a propellant cartridge capable of inducing a pressure rise rate which stimulates the ignition transient that occurs during launch. Dynamic loads are applied during the pressure cycle to simulate external tank attach (ETA) strut loads present on the ETA ring. Sealing ability of the redesigned joints is evaluated under joint movement conditions produced by these combined loads since joint sealing ability depends on seal resilience velocity being greater than gap opening velocity. Also, maximum flight dynamic loads are applied to the test article which is either pressurized to 600 psia using gaseous nitrogen (GN2) or applied to the test article as the pressure decays inside the test article on the down cycle after the ignition transient cycle. This new test facility is examined with respect to its capabilities. In addition, both the topic of test effectiveness versus space vehicle flight performance and new aerospace test techniques, as well as a comparison between the old SRM design and the RSRM are presented.

  7. Solar panel acceptance testing using a pulsed solar simulator

    NASA Technical Reports Server (NTRS)

    Hershey, T. L.

    1977-01-01

    Utilizing specific parameters as area of an individual cell, number in series and parallel, and established coefficient of current and voltage temperature dependence, a solar array irradiated with one solar constant at AMO and at ambient temperature can be characterized by a current-voltage curve for different intensities, temperatures, and even different configurations. Calibration techniques include: uniformity in area, depth and time, absolute and transfer irradiance standards, dynamic and functional check out procedures. Typical data are given for individual cell (2x2 cm) to complete flat solar array (5x5 feet) with 2660 cells and on cylindrical test items with up to 10,000 cells. The time and energy saving of such testing techniques are emphasized.

  8. Acceptance test report for the Tank 241-C-106 in-tank imaging system

    SciTech Connect

    Pedersen, L.T.

    1998-05-22

    This document presents the results of Acceptance Testing of the 241-C-106 in-tank video camera imaging system. The purpose of this imaging system is to monitor the Project W-320 sluicing of Tank 241-C-106. The objective of acceptance testing of the 241-C-106 video camera system was to verify that all equipment and components function in accordance with procurement specification requirements and original equipment manufacturer`s (OEM) specifications. This document reports the results of the testing.

  9. AUSSAT battery life test program

    NASA Technical Reports Server (NTRS)

    Gorian, P. W.; Pickett, D. F., Jr.; Bogner, R. S.; Chao, T. I.; Jordan, J. P.; Clark, K. B.

    1985-01-01

    AUSSAT Pty. Ltd., the Australian National Satellite organization, has contracted with the Hughes Aircraft Company (HAC) for the construction of 3 satellites based on the now familiar HS-376 product line. As part of the AUSSAT contract, HAC is conducting an extensive NiCd battery life test program. The life test program, objectives and test results to date are described. Particular emphasis is given to the evaluation of the FS2117 separator as a future replacement for the Pellon 2505 separator of which only a very limited quantity remains.

  10. Accelerated leach test development program

    SciTech Connect

    Fuhrmann, M.; Pietrzak, R.F.; Heiser, J.; Franz, E.M.; Colombo, P.

    1990-11-01

    In FY 1989, a draft accelerated leach test for solidified waste was written. Combined test conditions that accelerate leaching were validated through experimental and modeling efforts. A computer program was developed that calculates test results and models leaching mechanisms. This program allows the user to determine if diffusion controls leaching and, if this is the case, to make projections of releases. Leaching mechanisms other than diffusion (diffusion plus source term partitioning and solubility limited leaching) are included in the program is indicators of other processes that may control leaching. Leach test data are presented and modeling results are discussed for laboratory scale waste forms composed of portland cement containing sodium sulfate salt, portland cement containing incinerator ash, and vinyl ester-styrene containing sodium sulfate. 16 refs., 38 figs., 5 tabs.

  11. Test report for run-in acceptance testing of hydrogen mitigation test pump-2

    SciTech Connect

    Brewer, A.K.; Kolowith, R.

    1995-01-01

    This document provides the results of the run-in test of the replacement mixer pump for the Tank 241-SY-101. The test was conducted at the 400 Area MASF facility between August 12 and September 29, 1994. The report includes findings, analysis, recommendations, and corrective actions taken.

  12. Rubidium frequency standard test program for NAVSTAR GPS

    NASA Technical Reports Server (NTRS)

    Koide, F.; Dederich, D. J.

    1978-01-01

    Test data of the RFS Program in the Production phase and computer automation are presented, as an essential element in the evaluation of the RFS performance in a simulated spacecraft environment. Typical production test data will be discussed for stabilities from 1 to 100,000 seconds averaging time and simulated time error accumulation test. Also, design considerations in developing the RFS test systems for the acceptance test in production are discussed.

  13. 46 CFR 162.060-12 - Use and acceptance of existing test data.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 6 2012-10-01 2012-10-01 false Use and acceptance of existing test data. 162.060-12 Section 162.060-12 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ENGINEERING EQUIPMENT Ballast Water Management Systems § 162.060-12 Use and acceptance of...

  14. 7 CFR 1755.400 - RUS standard for acceptance tests and measurements of telecommunications plant.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 11 2014-01-01 2014-01-01 false RUS standard for acceptance tests and measurements of telecommunications plant. 1755.400 Section 1755.400 Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE TELECOMMUNICATIONS POLICIES ON SPECIFICATIONS, ACCEPTABLE MATERIALS,...

  15. 7 CFR 1755.400 - RUS standard for acceptance tests and measurements of telecommunications plant.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 11 2013-01-01 2013-01-01 false RUS standard for acceptance tests and measurements of telecommunications plant. 1755.400 Section 1755.400 Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE TELECOMMUNICATIONS POLICIES ON SPECIFICATIONS, ACCEPTABLE MATERIALS,...

  16. 7 CFR 1755.400 - RUS standard for acceptance tests and measurements of telecommunications plant.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false RUS standard for acceptance tests and measurements of telecommunications plant. 1755.400 Section 1755.400 Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE TELECOMMUNICATIONS POLICIES ON SPECIFICATIONS, ACCEPTABLE MATERIALS,...

  17. 7 CFR 1755.400 - RUS standard for acceptance tests and measurements of telecommunications plant.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 11 2012-01-01 2012-01-01 false RUS standard for acceptance tests and measurements of telecommunications plant. 1755.400 Section 1755.400 Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE TELECOMMUNICATIONS POLICIES ON SPECIFICATIONS, ACCEPTABLE MATERIALS,...

  18. 7 CFR 1755.400 - RUS standard for acceptance tests and measurements of telecommunications plant.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 11 2011-01-01 2011-01-01 false RUS standard for acceptance tests and measurements of telecommunications plant. 1755.400 Section 1755.400 Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE TELECOMMUNICATIONS POLICIES ON SPECIFICATIONS, ACCEPTABLE MATERIALS,...

  19. Acceptance of Genetic Testing in a General Population: Age, Education and Gender Differences.

    ERIC Educational Resources Information Center

    Aro, A. R.; Hakonen, A.; Hietala, M.; Lonnqvist, J.; Niemela, P.; Peltonen, L; Aula, P.

    1997-01-01

    Effects of age, education, and gender on acceptance of genetic testing were studied. Finnish participants responded to a questionnaire presenting reasons for and against genetic testing (N=1,967). Intentions to take genetic tests, worries, and experience of genetic test or hereditary disease were also assessed. Results are presented and discussed.…

  20. Project B610 process control configuration acceptance test procedure

    SciTech Connect

    Silvan, G.R.

    1994-09-20

    The purpose of this test is to verify the Westinghouse configuration of the MICON A/S Distributed Control System for project B610. The following will be verified: proper assignment and operation of all field inputs to and outputs from the MICON Termination panels; proper operation of all display data on the operator`s console; proper operation of all required alarms; and proper operation of all required interlocks. The MICON A/S control system is configured to replace all the control, indication, and alarm panels now located in the Power Control Room. Nine systems are covered by this control configuration, 2736-ZB HVAC, 234-5Z HVAC, Process Vacuum, Dry Air, 291-Z Closed Loop Cooling, Building Accelerometer, Evacuation Siren, Stack CAMs, and Fire. The 2736-ZB HVAC system consists of the ventilation controls for 2736-ZB and 2736-Z as well as alarms for the emergency generators and 232-Z. The 234-5Z HVAC system is the ventilation controls for 235-5Z and 236-Z buildings. Process Vacuum covers the controls for the 26 inch vacuum system. Dry Air covers the controls for the steam and electric air dryers. The 291-Z Closed Loop Cooling system consists of the status indications and alarms for the 291-Z compressor and vacuum pump closed loop cooling system. The rest of closed loop cooling was tested earlier. The Building Accelerometer system consists of the status indications for the two seismic system accelerometers. The Evacuation Siren system includes the controls for the evacuation and take cover sirens. Stack CAMs cover the alarms for the various building ventilation stack continuous air monitors. Finally, the Fire system covers the various fire alarms now located in Room 321-A.

  1. 46 CFR 10.408 - Coast Guard-accepted training other than approved courses and programs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 1 2014-10-01 2014-10-01 false Coast Guard-accepted training other than approved courses and programs. 10.408 Section 10.408 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MERCHANT MARINE OFFICERS AND SEAMEN MERCHANT MARINER CREDENTIAL Training Courses and Programs § 10.408 Coast...

  2. 49 CFR 1546.105 - Acceptance of and amendments to the security program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 9 2014-10-01 2014-10-01 false Acceptance of and amendments to the security program. 1546.105 Section 1546.105 Transportation Other Regulations Relating to Transportation (Continued) TRANSPORTATION SECURITY ADMINISTRATION, DEPARTMENT OF HOMELAND SECURITY CIVIL AVIATION SECURITY FOREIGN AIR CARRIER SECURITY Security Program §...

  3. 78 FR 45983 - Acceptability of Corrective Action Programs for Fuel Cycle Facilities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-30

    ...The U.S. Nuclear Regulatory Commission (NRC) is withdrawing draft NUREG-2154, ``Acceptability of Corrective Action Programs for Fuel Cycle Facilities,'' based on receipt and review of public comments. The draft NUREG provided guidance to NRC staff on how to determine whether a submittal for a Corrective Action Program (CAP), voluntarily submitted by fuel cycle facility licensees, was......

  4. Diagnostic rhyme test statistical analysis programs

    NASA Astrophysics Data System (ADS)

    Sim, A.; Bain, R.; Belyavin, A. J.; Pratt, R. L.

    1991-08-01

    The statistical techniques and associated computer programs used to analyze data from Diagnostic Rhyme Test (DRT) are described. The DRT is used extensively for assessing the intelligibility of military communications systems and became an accepted NATO standard for testing linear predictive coders. The DRT vocabulary comprises ninety six minimally contrasting rhyming word pairs, the initial consonants of which differ only by a single acoustic feature, or attribute. There are six such attributes: voicing, nasality, sustention, silibation, graveness, and compactness. The attribute voicing is present when the vocal cords are excited: in the word pair 'veal-feel', the consonant 'v' is voiced, but the constant 'f' is unvoiced. The procedure for the implementation of the DRT is presented. To ensure the stability of the results, tests using not less than eight talkers and eight listeners are conducted.

  5. DOD Space Test Program (STP)

    NASA Technical Reports Server (NTRS)

    Smith, Llwyn

    1995-01-01

    This paper describes the Space Test Program (STP) which provides access to space for the DOD-wide space research and development (R&D) community. STP matches a ranked list of sanctioned experiments with available budgets and searches for the most cost effective mechanisms to get the experiments into space. The program has successfully flown over 350 experiments, using dedicated freeflyer spacecraft, secondary space on the Space Shuttle, and various host satellites.

  6. Acceptability and feasibility of CyberSenga: an Internet-based HIV-prevention program for adolescents in Mbarara, Uganda.

    PubMed

    Ybarra, Michele L; Bull, Sheana S; Prescott, Tonya L; Birungi, Ruth

    2014-04-01

    Capitalizing on emerging data suggesting that HIV-preventive behaviors can be positively affected by Internet-based programs, we developed and tested CyberSenga, an Internet-based, comprehensive sexuality education program for adolescents in Mbarara, Uganda. Three hundred and sixty-six secondary school students were randomly assigned to either the five-lesson program (+ booster) or a treatment-as-usual control. At three-month follow-up, intervention participants provided feedback on the program acceptability. Six focus groups with intervention participants were additionally conducted after the final follow-up at 6 months. Data support a hypothesis of feasibility: despite schedule interruptions, 95% of intervention participants completed all the five modules; only 17% deviated from the once-a-week intended delivery schedule. Internet service was uninterrupted during the field period and, in general, the technology performed to specifications. The intervention also appears to be acceptable: 94% of intervention youth somewhat or strongly agreed that they learned a lot and 93% said they were somewhat or very likely to recommend the program. Although more than two in three youth somewhat or strongly agreed that the program talked too much about sex (70%) and condoms (75%), 89% somewhat or strongly disagreed that "I do not think kids like me should do the CyberSenga program." Feedback from focus group participants further suggested that the content was generally acceptable and did not contradict local norms in most cases. In fact, despite concerns from some local stakeholders to the contrary, information about condoms did not appear to be confusing or contradictory for youth who were abstinent. Nonetheless, some of the sexual topics seemed to be unfamiliar or uncomfortable for some participants - particularly brief references to oral and anal sex. Together, both qualitative and quantitative data suggest that the program is a feasible and acceptable way of delivering HIV

  7. Rape myth acceptance in men who completed the prostitution offender program of British Columbia.

    PubMed

    Klein, Carolin; Kennedy, M Alexis; Gorzalka, Boris B

    2009-06-01

    In an effort to characterize the attitudes and characteristics of men who solicit sex, this study investigated rape myth acceptance as assessed by a modification of Burt's Rape Myth Acceptance Scale. The participants were all men who took part in the Prostitution Offender Program of British Columbia after being arrested for attempting to solicit sex from an undercover police officer. Relationships between endorsement of rape myths, other attitudes, sexual behavior, and demographic variables were examined. Results reveal that age, education, use of pornography, ideal frequency of intercourse, and believing that purchasing sex is a problem are all negatively correlated with rape myth acceptance. Positive correlations were found between rape myth acceptance and sexual conservatism, sexual violence/coercion, and social desirability. Results are discussed in terms of the association between rape myth acceptance and the violence frequently perpetrated against those working in the sex trade. PMID:18397991

  8. Fatigue acceptance test limit criteria for larger diameter rolled thread fasteners

    SciTech Connect

    Kephart, A.R.

    1999-05-19

    This document describes a fatigue lifetime acceptance test criterion by which studs having rolled threads, larger than 1.0 inches (25 mm) in diameter, can be assured to meet minimum quality attributes associated with a controlled rolling process.

  9. NEP space test program objective

    NASA Astrophysics Data System (ADS)

    The objective of the Nuclear Electric Propulsion (NEP) space test program is to launch an NEP satellite powered by the Russion Topaz 2 reactor by Dec. 1995. The primary goals of the NEP space test program are as follows: (1) demonstrate the feasibility of launching a space nuclear power system; (2) demonstrate and orbit adjust capability using NEP; (3) evaluate the in-orbit performance of the Topaz 2 reactor and selected electric thrusters; and (4) measure, analyze, and model the NEP self-induced environment. The discussion is presented in vugraph form.

  10. NEP Space Test Program Objective

    NASA Technical Reports Server (NTRS)

    1992-01-01

    The objective of the Nuclear Electric Propulsion (NEP) space test program is to launch an NEP satellite powered by the Russion Topaz 2 reactor by Dec. 1995. The primary goals of the NEP space test program are as follows: (1) demonstrate the feasibility of launching a space nuclear power system; (2) demonstrate and orbit adjust capability using NEP; (3) evaluate the in-orbit performance of the Topaz 2 reactor and selected electric thrusters; and (4) measure, analyze, and model the NEP self-induced environment. The discussion is presented in vugraph form.

  11. Acceptance of HIV Antibody Testing Among Women in Domestic Violence Shelters

    PubMed Central

    Ratcliff, Tanya M.; Zlotnick, Caron; Cu-Uvin, Susan; Payne, Nanetta; Sly, Kaye; Flanigan, Timothy

    2015-01-01

    The purpose of this study was to examine which factors derived from an adapted version of the Health Belief Model are associated with HIV testing among women at domestic violence shelters in the rural south (N = 112). Participants were administered self-report questionnaires to assess for test acceptance and were offered private and free HIV rapid testing. A logistic regression analysis was performed. Results indicated that higher perceived susceptibility and higher PTSD symptoms predicted a greater likelihood of HIV test acceptance. The most common reason given for not testing was a lack of time. Implications are discussed. PMID:26085820

  12. Acceptability and feasibility of CyberSenga, an Internet-based HIV prevention program for adolescents in Mbarara, Uganda

    PubMed Central

    Bull, Sheana; Prescott, Tonya L.; Birungi, Ruth

    2013-01-01

    Capitalizing on emerging data suggesting that HIV preventive behaviors can be positively affected by Internet-based programs, we developed and tested CyberSenga, an Internet-based, comprehensive sexuality education program for adolescents in Mbarara, Uganda. Three hundred and sixty-six secondary school students were randomly assigned to either the 5-lesson program (+ booster) or a treatment-as-usual control. At three-month follow-up, intervention participants provided feedback on program acceptability. Six focus groups with intervention participants were additionally conducted after the final follow-up at 6 months. Data support a hypothesis of feasibility: Despite schedule interruptions, 95% of intervention participants completed all 5 modules; only 17% deviated from the once-a-week intended delivery schedule. Internet service was uninterrupted during the field period and, in general, the technology performed to specifications. The intervention also appears to be acceptable: 94% of intervention youth somewhat or strongly agreed that they learned a lot and 93% said they were somewhat or very likely to recommend the program. Although more than two in three youth somewhat or strongly agreed that the program talked too much about sex (70%) and condoms (75%), 89% somewhat or strongly disagreed that “I do not think kids like me should do the CyberSenga program”. Feedback from focus group participants further suggested that the content was generally acceptable and did not contradict local norms in most cases. In fact, despite concerns from some local stakeholders to the contrary, information about condoms did not appear to be confusing or contradictory for youth who were abstinent. Nonetheless, some of the sexual topics seemed to be unfamiliar or uncomfortable for some participants – particularly brief references to oral and anal sex. Together, both qualitative and quantitative data suggest that the program is a feasible and acceptable way of delivering HIV

  13. Optical guidance vidicon test program

    NASA Technical Reports Server (NTRS)

    Eiseman, A. R.; Stanton, R. H.; Voge, C. C.

    1976-01-01

    A laboratory and field test program was conducted to quantify the optical navigation parameters of the Mariner vidicons. A scene simulator and a camera were designed and built for vidicon tests under a wide variety of conditions. Laboratory tests characterized error sources important to the optical navigation process and field tests verified star sensitivity and characterized comet optical guidance parameters. The equipment, tests and data reduction techniques used are described. Key test results are listed. A substantial increase in the understanding of the use of selenium vidicons as detectors for spacecraft optical guidance was achieved, indicating a reduction in residual offset errors by a factor of two to four to the single pixel level.

  14. Test report for run-in acceptance testing of hydrogen mitigation retrieval Pump-3

    SciTech Connect

    Berglin, B.G.

    1997-08-15

    This report will provide the findings of the demonstration test conducted on the Double-Shell Tank (DST) 241-SY-101 HMR Pump-3 in accordance with WHC-SDWM-TP-434 ``Test plan for run-in acceptance testing of hydrogen mitigation/retrieval pump-3`` at the 400 Area Maintenance and Storage Facility (MASF) building from 7 June 1996 through 30 July 1996 per work package 4A-96-92/W. The DST 241-SY-101 hydrogen mitigation retrieval Pump-3 is a 200-HP submersible electric driven pump that has been modified for use in the DST 241-SY-101 containing mixed waste located in the 200W area. The pump has a motor driven rotation mechanism that allows the pump column to rotate through 355{degree}. Prior to operation, pre-operational checks were performed which included loop calibration grooming and alignment of instruments, learning how plumb HMR-3 assembly hung in a vertical position and bump test of the motor to determine rotation direction. The pump was tested in the MASF Large Diameter Cleaning Vessel (LDCV) with process water at controlled temperatures and levels. In addition, the water temperature of the cooling water to the motor oil heat exchanger was recorded during testing. A 480-volt source powered a Variable Frequency Drive (VFD). The VFD powered the pump at various frequencies and voltages to control speed and power output of the pump. A second VFD powered the oil cooling pump. A third VFD was not available to operate the rotational drive motor during the 72 hour test, so it was demonstrated as operational before and after the test. A Mini Acquisition and Control System (Mini-DACS) controls pump functions and monitoring of the pump parameters. The Mini-DACS consists of three computers, software and some Programmable Logic Controllers (PLC). Startup and shutdown of either the pump motor or the oil cooling pump can be accomplished by the Mini-DACS. When the pump was in operation, the Mini-DACS monitors automatically collects data electronically. However, some required data

  15. ABSL 18650HC Lot Acceptance Test- Ensuring Consistency And Flight Performance

    NASA Astrophysics Data System (ADS)

    Buckle, Rachel; Thwaite, Carl

    2011-10-01

    ABSL manufactures Space batteries using commercial cells. As the battery sizing is based on test data from cells purchased up to 10 years ago, a rigorous programme of testing is carried out to ensure batch consistency, flight quality and any implications for sizing are found early. A Lot Acceptance Test (LAT) is carried out on each new batch of cells purchased. A selection of cells undergo tests on their build quality, environmental tolerance, safety devices and lifetime degradation. This process will be described, along with issues such as setting acceptance criteria, comparison of results between batches, and what happens if a batch fails.

  16. Participation in Counseling Programs: High-Risk Participants Are Reluctant to Accept HIV-Prevention Counseling

    PubMed Central

    Earl, Allison; Albarracín, Dolores; Durantini, Marta R.; Gunnoe, Joann B.; Leeper, Josh; Levitt, Justin H.

    2013-01-01

    HIV-prevention intervention effectiveness depends on understanding whether clients with highest need for HIV-prevention counseling accept it. With this objective, a field study with a high-risk community sample from the southeastern United States (N = 350) investigated whether initial knowledge about HIV, motivation to use condoms, condom-use-relevant behavioral skills, and prior condom use correlate with subsequent acceptance of an HIV-prevention counseling session. Ironically, participants with high (vs. low) motivation to use condoms, high (vs. low) condom-use-relevant behavioral skills, and high (vs. low) prior condom use were more likely to accept the HIV-prevention counseling. Moreover, the influence of motivation to use condoms, condom-use-relevant behavioral skills, and prior condom use on acceptance of the counseling was mediated by expectations that the counseling session would be useful. Methods to reduce barriers to recruitment of clients for counseling programs are discussed. PMID:19634960

  17. Building Energy Simulation Test for Existing Homes (BESTEST-EX): Instructions for Implementing the Test Procedure, Calibration Test Reference Results, and Example Acceptance-Range Criteria

    SciTech Connect

    Judkoff, R.; Polly, B.; Bianchi, M.; Neymark, J.; Kennedy, M.

    2011-08-01

    This publication summarizes building energy simulation test for existing homes (BESTEST-EX): instructions for implementing the test procedure, calibration tests reference results, and example acceptance-range criteria.

  18. Test program, helium II orbital resupply coupling

    NASA Technical Reports Server (NTRS)

    Hyatt, William S.

    1991-01-01

    The full scope of this program was to have included development tests, design and production of custom test equipment and acceptance and qualification testing of prototype and protoflight coupling hardware. This program was performed by Ball Aerospace Systems Division, Boulder, Colorado until its premature termination in May 1991. Development tests were performed on cryogenic face seals and flow control devices at superfluid helium (He II) conditions. Special equipment was developed to allow quantified leak detection at large leak rates up to 8.4 x 10(exp -4) SCCS. Two major fixtures were developed and characterized: The Cryogenic Test Fixture (CTF) and the Thermal Mismatch Fixture (Glovebox). The CTF allows the coupling hardware to be filled with liquid nitrogen (LN2), liquid helium (LHe) or sub-cooled liquid helium when hardware flow control valves are either open or closed. Heat leak measurements, internal and external helium leakage measurements, cryogenic proof pressure tests and external load applications are performed in this fixture. Special reusable MLI closures were developed to provide repeatable installations in the CTF. The Thermal Mismatch Fixture allows all design configurations of coupling hardware to be engaged and disengaged while measuring applied forces and torques. Any two hardware components may be individually thermally preconditioned within the range of 117 deg K to 350 deg K prior to engage/disengage cycling. This verifies dimensional compatibility and operation when thermally mismatched. A clean, dry GN2 atmosphere is maintained in the fixture at all times. The first shipset of hardware was received, inspected and cycled at room temperature just prior to program termination.

  19. Nurses' acceptance of the decision support computer program for cancer pain management.

    PubMed

    Im, Eun-Ok; Chee, Wonshik

    2006-01-01

    This article describes nurses' acceptance of a decision support computer program for cancer pain management and explores the relationships between the nurses' acceptance and their sociodemographic characteristics. A feminist perspective was used as a theoretical guide for the research process. This was an Internet intervention study among 122 nurses working with cancer patients. Nurses' acceptance of the decision support computer program was measured using the Questionnaire for User Interaction Satisfaction. The data were analyzed using descriptive and inferential statistics, including analysis of variance and correlation analyses. There were significant differences in the total scores of user satisfaction by sex, religion, ethnicity, job title, and specialty. The results suggest that nurses do welcome decision support systems and that nurses' sociodemographic and professional characteristics should be considered in the development of decision support systems. PMID:16554693

  20. Standard-B auto grab sampler hydrogen monitoring system, Acceptance Test Report

    SciTech Connect

    Lott, D.T.

    1995-05-18

    Project W-369, Watch List Tank Hydrogen Monitors, installed a Standard-C Hydrogen Monitoring System (SHMS) on the Flammable gas waste tank AN-104. General Support Projects (8K510) was support by Test Engineering (7CH30) in the performance of the Acceptance Test Procedures (ATP) to qualify the SHMS cabinets on the waste tank. The ATP`s performance was controlled by Tank Farm work package. This completed ATP is transmitted by EDT-601748 as an Acceptance Test Report (ATR) in accordance with WHC-6-1, EP 4.2 and EP 1.12.

  1. Delinquency and Peer Acceptance in Adolescence: A Within-Person Test of Moffitt’s Hypotheses

    PubMed Central

    Rulison, Kelly L; Kreager, Derek A.; Osgood, D. Wayne

    2015-01-01

    We tested two hypotheses derived from Moffitt’s (1993) taxonomic theory of antisocial behavior, both of which are central to her explanation for the rise in delinquency during adolescence. Specifically, we tested whether persistently delinquent individuals become more accepted by their peers during adolescence and whether individuals who abstain from delinquent behavior become less accepted. Participants were 4,359 adolescents from 14 communities in the PROSPER study, which assessed friendship networks and delinquency from 6th (M = 11.8 years) to 9th (M = 15.3 years) grade. We operationalized peer acceptance as: number of nominations received (indegree centrality), attractiveness as a friend (adjusted indegree centrality), and network bridging potential (betweenness centrality) and tested the hypotheses using multilevel modeling. Contrary to Moffitt’s hypothesis, persistently delinquent youth did not become more accepted between early and middle adolescence, and although abstainers were less accepted in early adolescence, they became more accepted over time. Results were similar for boys and girls; when differences occurred, they provided no support for Moffitt’s hypotheses for boys and were opposite of her hypotheses for girls. Sensitivity analyses using alternative strategies and additional data to identify persistently delinquent adolescents produced similar results. We explore the implications of these results for Moffitt’s assertions that social mimicry of persistently antisocial adolescents leads to increases in delinquency and that social isolation leads to abstention. PMID:25243328

  2. Delinquency and peer acceptance in adolescence: a within-person test of Moffitt's hypotheses.

    PubMed

    Rulison, Kelly L; Kreager, Derek A; Osgood, D Wayne

    2014-11-01

    We tested 2 hypotheses derived from Moffitt's (1993) taxonomic theory of antisocial behavior, both of which are central to her explanation for the rise in delinquency during adolescence. We tested whether persistently delinquent individuals become more accepted by their peers during adolescence and whether individuals who abstain from delinquent behavior become less accepted. Participants were 4,359 adolescents from 14 communities in the PROSPER study, which assessed friendship networks and delinquency from 6th (M = 11.8 years) to 9th (M = 15.3 years) grade. We operationalized peer acceptance as number of nominations received (indegree centrality), attractiveness as a friend (adjusted indegree centrality), and network bridging potential (betweenness centrality) and tested the hypotheses with multilevel modeling. Contrary to Moffitt's hypothesis, persistently delinquent youths did not become more accepted between early and middle adolescence, and although abstainers were less accepted in early adolescence, they became more accepted over time. Results were similar for boys and girls; when differences occurred, they provided no support for Moffitt's hypotheses for boys and were opposite of her hypotheses for girls. Sensitivity analyses in which alternative strategies and additional data were used to identify persistently delinquent adolescents produced similar results. We explore the implications of these results for Moffitt's assertions that social mimicry of persistently antisocial adolescents leads to increases in delinquency and that social isolation leads to abstention. (PsycINFO Database Record (c) 2014 APA, all rights reserved). PMID:25243328

  3. 78 FR 11903 - Acceptability of Corrective Action Programs for Fuel Cycle Facilities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-20

    ... COMMISSION Acceptability of Corrective Action Programs for Fuel Cycle Facilities AGENCY: Nuclear Regulatory... Fuel Cycle Facilities.'' The draft NUREG provides guidance to the NRC staff on how to determine whether a Corrective Action Plan (CAP) submitted by the licensee of a fuel cycle facility is...

  4. 49 CFR 1546.105 - Acceptance of and amendments to the security program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 9 2011-10-01 2011-10-01 false Acceptance of and amendments to the security program. 1546.105 Section 1546.105 Transportation Other Regulations Relating to Transportation (Continued) TRANSPORTATION SECURITY ADMINISTRATION, DEPARTMENT OF HOMELAND SECURITY CIVIL AVIATION SECURITY FOREIGN...

  5. Adolescent Suicide Prevention: School Psychologists' Acceptability of School-Based Programs

    ERIC Educational Resources Information Center

    Eckert, Tanya L.; Miller, David N.; DuPaul, George J.; Riley-Tillman, T. Christopher

    2003-01-01

    From a random sample of members of the 1996-1997 membership directory of the National Association of School Psychologists (NASP), school psychologists' acceptability ratings of three school-based programs for the prevention of adolescent suicide were examined. A total of 211 (46.2%) respondents read a case description of a particular prevention…

  6. Youth Suicide Prevention: A Survey of Public School Superintendents' Acceptability of School-Based Programs

    ERIC Educational Resources Information Center

    Scherff, Andrew R.; Eckert, Tanya L.; Miller, David N.

    2005-01-01

    From a random sample of members of the 2000-2001 membership directory of the American Association of School Administrators (AASA), public school administrators' acceptability ratings of three school-based programs for the prevention of adolescent suicide were examined. A total of 210 (46%) respondents examined a description of a suicide prevention…

  7. Feasibility of a Prototype Web-Based Acceptance and Commitment Therapy Prevention Program for College Students

    ERIC Educational Resources Information Center

    Levin, Michael E.; Pistorello, Jacqueline; Seeley, John R.; Hayes, Steven C.

    2014-01-01

    Objective: This study examined the feasibility of a prototype Web-based acceptance and commitment therapy (ACT) program for preventing mental health problems among college students. Participants: Undergraduate first-year students ("N" = 76) participated between May and November 2011. Methods: Participants were randomized to ACT or a…

  8. Evaluating the Acceptability of Four Versions of a Child Sexual Abuse Prevention Program

    ERIC Educational Resources Information Center

    Kopp, Brandon; Miltenberger, Raymond G.

    2009-01-01

    Fifty-nine college students used a modified version of the Treatment Evaluation Inventory-Short Form to evaluate the acceptability of four versions of a sexual abuse prevention program for 10-year-old children. The four versions include an information-based training approach or a behavioral skills training (BST) approach with a focus on strangers…

  9. Accepting Credit Responsibility: Student Problem Book. Family Financial Education Program 2.

    ERIC Educational Resources Information Center

    Continental Illinois National Bank and Trust Co., Chicago.

    The student workbook was designed for a high school unit on accepting credit responsibility, part of a family financial education program which also includes a unit on managing personal income. The student book follows the same format as the teacher's guide and is based on six experiences which deal with: factors influencing buying, meaning of…

  10. Acceptability of Sexually Transmitted Infection Testing Using Self-Collected Vaginal Swabs among College Women

    ERIC Educational Resources Information Center

    Fielder, Robyn L.; Carey, Kate B.; Carey, Michael P.

    2013-01-01

    Objective: To assess the acceptability of sexually transmitted infection (STI) testing using self-collected vaginal swabs (SCVS) among college women. Participants: First-year female students ("N" = 483). Methods: Participants were offered free testing for 3 STIs using SCVS in April 2010 and later completed a survey regarding their…

  11. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid V

    SciTech Connect

    KOCH, M.R.

    2000-07-25

    This Acceptance Test Procedure (ATP) verifies proper construction per the design drawings and tests for proper functioning of the Pumping Instrumentation and Control (PIC) skid ''V''. The scope section lists the systems and functions to be checked. This ATP will be performed at the Site Fabrication Services (SFS) shop upon completion of the construction of the PIC skid.

  12. Acceptance Test Procedure for New Pumping and Instrumentation Control Skid M

    SciTech Connect

    KOCH, M.R.

    1999-11-09

    This Acceptance Test Procedure (ATP) verifies proper construction per the design drawings and tests for proper functioning of the Pumping and Instrumentation Control (PIC) skid ''M''. The Scope section lists the systems and functions to be checked. This ATP will be performed at the Site Fabrication Service's (SFS) shop upon completion of construction of the PIC skid.

  13. Enraf series 854 Advanced Technology Gauge (ATG) acceptance test procedure. Revision 3

    SciTech Connect

    Barnes, G.A.

    1995-05-08

    This procedure provides acceptance testing for Enraf Series 854 level gauges used to monitor levels in Hanford Waste Storage Tanks. The test will verify that the gauge functions according to the manufacturer`s instructions and specifications and is properly setup prior to being delivered to the tank farm area.

  14. DEMONSTRATION OF WELLMAN-LORD/ALLIED CHEMICAL FGD TECHNOLOGY: ACCEPTANCE TEST RESULTS

    EPA Science Inventory

    The report gives results of acceptance tests of Wellman-Lord/Allied Chemical flue gas desulfurization (FGD) technology. Process performance guarantees were met or exceeded. During the 12-day Design Load test, the plant was operated at the design condition of a boiler flue gas out...

  15. 241-AZ-101 Waste Tank Color Video Camera System Shop Acceptance Test Report

    SciTech Connect

    WERRY, S.M.

    2000-03-23

    This report includes shop acceptance test results. The test was performed prior to installation at tank AZ-101. Both the camera system and camera purge system were originally sought and procured as a part of initial waste retrieval project W-151.

  16. Understanding Student Teachers' Behavioural Intention to Use Technology: Technology Acceptance Model (TAM) Validation and Testing

    ERIC Educational Resources Information Center

    Wong, Kung-Teck; Osman, Rosma bt; Goh, Pauline Swee Choo; Rahmat, Mohd Khairezan

    2013-01-01

    This study sets out to validate and test the Technology Acceptance Model (TAM) in the context of Malaysian student teachers' integration of their technology in teaching and learning. To establish factorial validity, data collected from 302 respondents were tested against the TAM using confirmatory factor analysis (CFA), and structural equation…

  17. Dual laser gyro test program

    NASA Technical Reports Server (NTRS)

    Jones, Malcolm E.; Moore, Kim Eric

    1987-01-01

    This paper addresses the results of a comparative test evaluation of two similar-sized but otherwise dissimilar ring laser gyroscopes (RLG's). Both units were tested side by side, with the input axes (IA's) parallel, on the same test table. This report describes the rationale and design factors considered important to the test objectives. Emphasis was placed upon the evaluation of the scale factor (SF) linearity, drift rate stability (short term and long term), and derived rate. Conclusions drawn were (1) that dual operation had an observable but insignificant effect on the test results, (2) that the benefits of dual operation outweighed the additional design and analysis efforts required at the outset of the program, and (3) that the performance characteristics of the two test articles were significantly different. The differences between the two test articles (1) led to suggestions which could direct one vendor toward obtaining improved performance and (2) resulted in the creation of a conceptually new method (DELTA TIME-COUNT histogram) for quickly assessing the quality of laser gyros (or any digital sensor device for that matter).

  18. Fatigue acceptance test limit criterion for larger diameter rolled thread fasteners

    SciTech Connect

    Kephart, A.R.

    1997-05-01

    This document describes a fatigue lifetime acceptance test criterion by which studs having rolled threads, larger than 1.0 inches in diameter, can be assured to meet minimum quality attributes associated with a controlled rolling process. This criterion is derived from a stress dependent, room temperature air fatigue database for test studs having a 0.625 inch diameter threads of Alloys X-750 HTH and direct aged 625. Anticipated fatigue lives of larger threads are based on thread root elastic stress concentration factors which increase with increasing thread diameters. Over the thread size range of interest, a 30% increase in notch stress is equivalent to a factor of five (5X) reduction in fatigue life. The resulting diameter dependent fatigue acceptance criterion is normalized to the aerospace rolled thread acceptance standards for a 1.0 inch diameter, 0.125 inch pitch, Unified National thread with a controlled Root radius (UNR). Testing was conducted at a stress of 50% of the minimum specified material ultimate strength, 80 Ksi, and at a stress ratio (R) of 0.10. Limited test data for fastener diameters of 1.00 to 2.25 inches are compared to the acceptance criterion. Sensitivity of fatigue life of threads to test nut geometry variables was also shown to be dependent on notch stress conditions. Bearing surface concavity of the compression nuts and thread flank contact mismatch conditions can significantly affect the fastener fatigue life. Without improved controls these conditions could potentially provide misleading acceptance data. Alternate test nut geometry features are described and implemented in the rolled thread stud specification, MIL-DTL-24789(SH), to mitigate the potential effects on fatigue acceptance data.

  19. Acceptance of a community-based navigator program for cancer control among urban African Americans.

    PubMed

    Halbert, Chanita Hughes; Briggs, Vanessa; Bowman, Marjorie; Bryant, Brenda; Bryant, Debbie Chatman; Delmoor, Ernestine; Ferguson, Monica; Ford, Marvella E; Johnson, Jerry C; Purnell, Joseph; Rogers, Rodney; Weathers, Benita

    2014-02-01

    Patient navigation is now a standard component of cancer care in many oncology facilities, but a fundamental question for navigator programs, especially in medically underserved populations, is whether or not individuals will use this service. In this study, we evaluated acceptance of a community-based navigator program for cancer control and identified factors having significant independent associations with navigation acceptance in an urban sample of African Americans. Participants were African American men and women ages 50-75 who were residents in an urban metropolitan city who were referred for navigation. Of 240 participants, 76% completed navigation. Age and perceived risk of developing cancer had a significant independent association with navigation acceptance. Participants who believed that they were at high risk for developing cancer had a lower likelihood of completing navigation compared with those who believed that they had a low risk for developing this disease. The likelihood of completing navigation increased with increases in age. None of the socioeconomic factors or health care variables had a significant association with navigation acceptance. There are few barriers to using community-based navigation for cancer control among urban African Americans. Continued efforts are needed to develop and implement community-based programs for cancer control that are easy to use and address the needs of medically underserved populations. PMID:24173501

  20. High acceptance of an early dyslexia screening test involving genetic analyses in Germany.

    PubMed

    Wilcke, Arndt; Müller, Bent; Schaadt, Gesa; Kirsten, Holger; Boltze, Johannes

    2016-02-01

    Dyslexia is a developmental disorder characterized by severe problems in the acquisition of reading and writing skills. It has a strong neurobiological basis. Genetic influence is estimated at 50-70%. One of the central problems with dyslexia is its late diagnosis, normally not before the end of the 2nd grade, resulting in the loss of several years for early therapy. Currently, research is focusing on the development of early tests for dyslexia, which may be based on EEG and genetics. Our aim was to determine the acceptance of such a future test among parents. We conducted a representative survey in Germany with 1000 parents of children aged 3-7 years, with and without experience of dyslexia. 88.7% of the parents supported the introduction of an early test for dyslexia based on EEG and genetics; 82.8% would have their own children tested, and 57.9% were willing to pay for the test if health insurance did not cover the costs. Test acceptance was significantly higher if parents had prior experience with dyslexia. The perceived benefits of such a test were early recognition and remediation and, preventing deficits. Concerns regarded the precision of the test, its potentially stigmatizing effect and its costs. The high overall support for the test leads to the conclusion that parents would accept a test for dyslexia based on EEG and genetics. PMID:26036858

  1. TESTING AND ACCEPTANCE OF FUEL PLATES FOR RERTR FUEL DEVELOPMENT EXPERIMENTS

    SciTech Connect

    J.M. Wight; G.A. Moore; S.C. Taylor

    2008-10-01

    This paper discusses how candidate fuel plates for RERTR Fuel Development experiments are examined and tested for acceptance prior to reactor insertion. These tests include destructive and nondestructive examinations (DE and NDE). The DE includes blister annealing for dispersion fuel plates, bend testing of adjacent cladding, and microscopic examination of archive fuel plates. The NDE includes Ultrasonic (UT) scanning and radiography. UT tests include an ultrasonic scan for areas of “debonds” and a high frequency ultrasonic scan to determine the "minimum cladding" over the fuel. Radiography inspections include identifying fuel outside of the maximum fuel zone and measurements and calculations for fuel density. Details of each test are provided and acceptance criteria are defined. These tests help to provide a high level of confidence the fuel plate will perform in the reactor without a breach in the cladding.

  2. Acceptance test plan for the 241-AN-105 multi-function corrosion monitoring system

    SciTech Connect

    EDGEMON, G.L.

    1999-06-24

    This Acceptance Test Procedure (ATP) will document the satisfactory operation of the corrosion probe tree assembly destined for installation into tank 241-AN-105. This ATP will be performed by the manufacturer prior to delivery to the site. The objective of this procedure is to demonstrate and document the acceptance of the corrosion probe tree assembly to be installed into tank 241-AN-105. The test will consist of a pressure test to verify leak tightness of the probe tree body, a continuity test of the probe tree wiring, a test of the high level detector wiring, a test of the operation of the Type K thermocouples along the probe body, and verification of operation of corrosion monitoring computer and instrumentation.

  3. Local tolerance testing under REACH: Accepted non-animal methods are not on equal footing with animal tests.

    PubMed

    Sauer, Ursula G; Hill, Erin H; Curren, Rodger D; Raabe, Hans A; Kolle, Susanne N; Teubner, Wera; Mehling, Annette; Landsiedel, Robert

    2016-07-01

    In general, no single non-animal method can cover the complexity of any given animal test. Therefore, fixed sets of in vitro (and in chemico) methods have been combined into testing strategies for skin and eye irritation and skin sensitisation testing, with pre-defined prediction models for substance classification. Many of these methods have been adopted as OECD test guidelines. Various testing strategies have been successfully validated in extensive in-house and inter-laboratory studies, but they have not yet received formal acceptance for substance classification. Therefore, under the European REACH Regulation, data from testing strategies can, in general, only be used in so-called weight-of-evidence approaches. While animal testing data generated under the specific REACH information requirements are per se sufficient, the sufficiency of weight-of-evidence approaches can be questioned under the REACH system, and further animal testing can be required. This constitutes an imbalance between the regulatory acceptance of data from approved non-animal methods and animal tests that is not justified on scientific grounds. To ensure that testing strategies for local tolerance testing truly serve to replace animal testing for the REACH registration 2018 deadline (when the majority of existing chemicals have to be registered), clarity on their regulatory acceptance as complete replacements is urgently required. PMID:27494627

  4. W-026 acceptance test report plant control system hardware (submittal {number_sign} 220.C)

    SciTech Connect

    Watson, T.L., Fluor Daniel Hanford

    1997-02-14

    Acceptance Testing of the WRAP1 Plant Control System Hardware was conducted throughout the construction of WRAPI with the final testing on the Process Area hardware being completed in November 1996. The hardware tests were broken out by the following functional areas; Local Control Units, Operator Control Stations in the WRAP Control Room, DMS Server, PCS Server, Operator Interface Units, printers, DMS terminals, WRAP Local Area Network/Communications, and bar code equipment. This document contains a completed copy of each of the hardware tests along with the applicable test logs and completed test exception reports.

  5. W-026 acceptance test plan plant control system hardware (submittal {number_sign} 216)

    SciTech Connect

    Watson, T.L., Fluor Daniel Hanford

    1997-02-14

    Acceptance Testing of the WRAP 1 Plant Control System Hardware will be conducted throughout the construction of WRAP I with the final testing on the Process Area hardware being completed in November 1996. The hardware tests will be broken out by the following functional areas; Local Control Units, Operator Control Stations in the WRAP Control Room, DMS Server, PCS Server, Operator Interface Units, printers, DNS terminals, WRAP Local Area Network/Communications, and bar code equipment. This document will contain completed copies of each of the hardware tests along with the applicable test logs and completed test exception reports.

  6. Acceptance of HIV testing among women attending antenatal care in south-western Uganda: risk factors and reasons for test refusal.

    PubMed

    Dahl, V; Mellhammar, L; Bajunirwe, F; Björkman, P

    2008-07-01

    A problem commonly encountered in programs for prevention of mother-to-child-transmission (PMTCT) of HIV in sub-Saharan Africa is low rates of HIV test acceptance among pregnant women. In this study, we examined risk factors and reasons for HIV test refusal among 432 women attending three antenatal care clinics offering PMTCT in urban and semi-urban parts of the Mbarara district, Uganda. Structured interviews were performed following pre-test counselling. Three-hundred-eighty women were included in the study, 323 (85%) of whom accepted HIV testing. In multivariate analysis, testing site (Site A: OR = 1.0; Site B: OR = 3.08; 95%CI: 1.12-8.46; Site C: OR = 5.93; 95%CI: 2.94-11.98), age between 30 and 34 years (<20 years: OR = 1.0; 20-24 years: OR = 1.81; 95%CI: 0.58-5.67; 25-29 years: OR = 2.15; 95%CI: 0.66-6.97; 30-34 years: OR = 3.88; 95%CI: 1.21-13.41), mistrust in reliability of the HIV test (OR = 20.60; 95%CI: 3.24-131.0) and not having been tested for HIV previously (OR = 2.15; 95%CI: 1.02-4.54) were associated with test refusal. Testing sites operating for longer durations had higher rates of acceptance. The most common reasons claimed for test refusal were: lack of access to antiretroviral therapy (ART) for HIV-infected women (88%; n=57), a need to discuss with partner before decision (82%; n=57) and fear of partner's reaction (54%; n=57). Comparison with previous periods showed that the acceptance rate increased with the duration of the program. Our study identified risk factors for HIV test refusal among pregnant women in Uganda and common reasons for not accepting testing. These findings may suggest modifications and improvements in the performance of HIV testing in this and similar populations. PMID:18576178

  7. 105 K east ion exchange and cartridge filter restart instrumentation acceptance test report

    SciTech Connect

    Whitehurst, R.

    1996-01-08

    Acceptance Test Report following the completion of ATP-012 for the 105KE CP-A and CP-A Computer and PLC Panels. The test was conducted from 11/13/95 to 12/11/95. Three test discrepancies were generated during the ATP and all were dispositioned and closed. All sections were completed except Section 5.9 which was deleted per ECN 190556.

  8. Advanced expander test bed program

    NASA Technical Reports Server (NTRS)

    Masters, A. I.; Mitchell, J. C.

    1991-01-01

    The Advanced Expander Test Bed (AETB) is a key element in NASA's Chemical Transfer Propulsion Program for development and demonstration of expander cycle oxygen/hydrogen engine technology component technology for the next space engine. The AETB will be used to validate the high-pressure expander cycle concept, investigate system interactions, and conduct investigations of advanced missions focused components and new health monitoring techniques. The split-expander cycle AETB will operate at combustion chamber pressures up to 1200 psia with propellant flow rates equivalent to 20,000 lbf vacuum thrust.

  9. Utility-Scale Power Tower Solar Systems: Performance Acceptance Test Guidelines

    SciTech Connect

    Kearney, D.

    2013-03-01

    The purpose of these Guidelines is to provide direction for conducting performance acceptance testing for large power tower solar systems that can yield results of a high level of accuracy consistent with good engineering knowledge and practice. The recommendations have been developed under a National Renewable Energy Laboratory (NREL) subcontract and reviewed by stakeholders representing concerned organizations and interests throughout the concentrating solar power (CSP) community. An earlier NREL report provided similar guidelines for parabolic trough systems. These Guidelines recommend certain methods, instrumentation, equipment operating requirements, and calculation methods. When tests are run in accordance with these Guidelines, we expect that the test results will yield a valid indication of the actual performance of the tested equipment. But these are only recommendations--to be carefully considered by the contractual parties involved in the Acceptance Tests--and we expect that modifications may be required to fit the particular characteristics of a specific project.

  10. Physics of Colloids in Space--Plus (PCS+) Experiment Completed Flight Acceptance Testing

    NASA Technical Reports Server (NTRS)

    Doherty, Michael P.

    2004-01-01

    The Physics of Colloids in Space--Plus (PCS+) experiment successfully completed system-level flight acceptance testing in the fall of 2003. This testing included electromagnetic interference (EMI) testing, vibration testing, and thermal testing. PCS+, an Expedite the Process of Experiments to Space Station (EXPRESS) Rack payload will deploy a second set of colloid samples within the PCS flight hardware system that flew on the International Space Station (ISS) from April 2001 to June 2002. PCS+ is slated to return to the ISS in late 2004 or early 2005.

  11. Small, high-pressure ratio compressor mechanical acceptance test, volume 2

    NASA Technical Reports Server (NTRS)

    Metty, G. R.; Shoup, W. I.

    1973-01-01

    The fabrication and mechanical testing of the high-pressure-ratio compressor are reported. Mechanical testing was performed to demonstrate overspeed capability, adequate rotor dynamics, electrical isolation of the gas bearing trunnion mounted diffuser and shroud and the effect of operating parameters (speed and pressure ratio) on clearance of the compressor test rig. The speed range covered was 20 to 120 percent of rated speed (80,000 rpm). Following these tests an acceptance test which consisted of a 5 hour run at 80,000 rpm was made with approximately design impeller to shroud clearances. For Vol. 1, see N73-26483.

  12. Integrating Telemedicine for Disaster Response: Testing the Emergency Telemedicine Technology Acceptance Model

    ERIC Educational Resources Information Center

    Davis, Theresa M.

    2013-01-01

    Background: There is little evidence that technology acceptance is well understood in healthcare. The hospital environment is complex and dynamic creating a challenge when new technology is introduced because it impacts current processes and workflows which can significantly affect patient care delivery and outcomes. This study tested the effect…

  13. Development of Performance Acceptance Test Guidelines for Large Commercial Parabolic Trough Solar Fields: Preprint

    SciTech Connect

    Kearney, D.; Mehos, M.

    2010-12-01

    Prior to commercial operation, large solar systems in utility-size power plants need to pass a performance acceptance test conducted by the EPC contractor or owners. In lieu of the present absence of engineering code developed for this purpose, NREL has undertaken the development of interim guidelines to provide recommendations for test procedures that can yield results of a high level of accuracy consistent with good engineering knowledge and practice. The fundamental differences between acceptance of a solar power plant and a conventional fossil-fired plant are the transient nature of the energy source and the necessity to utilize an analytical performance model in the acceptance process. These factors bring into play the need to establish methods to measure steady state performance, potential impacts of transient processes, comparison to performance model results, and the possible requirement to test, or model, multi-day performance within the scope of the acceptance test procedure. The power block and BOP are not within the boundaries of this guideline. The current guideline is restricted to the solar thermal performance of parabolic trough systems and has been critiqued by a broad range of stakeholders in CSP development and technology.

  14. DUAL ALKALI ACCEPTANCE TEST AT LOUISVILLE GAS AND ELECTRIC COMPANY; VOLUME II. APPENDICES D-F

    EPA Science Inventory

    The report gives results of the completed acceptance test series run on the dual alkali system serving Louisville Gas and Electric Company's Cane Run Unit 6 boiler. This volume (Volume II) contains a discussion of the analytical and sampling methods, quality assurance, and the ra...

  15. DUAL ALKALI ACCEPTANCE TEST AT LOUISVILLE GAS AND ELECTRIC COMPANY; VOLUME III. APPENDICES G-J

    EPA Science Inventory

    The report gives results of the completed acceptance test series run on the dual alkali system serving Louisville Gas and Electric Company's Cane Run Unit 6 boiler. This volume (Volume III) contains raw data gathered by Kenvirons, calculations, and computerized reduced data submi...

  16. 40 CFR 600.009-85 - Hearing on acceptance of test data.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 30 2011-07-01 2011-07-01 false Hearing on acceptance of test data. 600.009-85 Section 600.009-85 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) ENERGY POLICY FUEL ECONOMY AND CARBON-RELATED EXHAUST EMISSIONS OF MOTOR VEHICLES Fuel Economy and...

  17. 46 CFR 160.062-8 - Procedures for acceptance of testing facility.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 6 2014-10-01 2014-10-01 false Procedures for acceptance of testing facility. 160.062-8 Section 160.062-8 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Releases. Lifesaving Equipment, Hydraulic and Manual § 160.062-8...

  18. 49 CFR 180.411 - Acceptable results of tests and inspections.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Acceptable results of tests and inspections. 180.411 Section 180.411 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE... QUALIFICATION AND MAINTENANCE OF PACKAGINGS Qualification and Maintenance of Cargo Tanks § 180.411...

  19. 49 CFR 180.511 - Acceptable results of inspections and tests.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Acceptable results of inspections and tests. 180.511 Section 180.511 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE... QUALIFICATION AND MAINTENANCE OF PACKAGINGS Qualification and Maintenance of Tank Cars § 180.511...

  20. 49 CFR 180.411 - Acceptable results of tests and inspections.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Acceptable results of tests and inspections. 180.411 Section 180.411 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE... QUALIFICATION AND MAINTENANCE OF PACKAGINGS Qualification and Maintenance of Cargo Tanks § 180.411...

  1. 49 CFR 180.511 - Acceptable results of inspections and tests.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... structural defect that may initiate cracks or propagate cracks and cause failure of the tank before the next... 49 Transportation 3 2013-10-01 2013-10-01 false Acceptable results of inspections and tests. 180... AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED)...

  2. Chile: Acceptability of a Training Program for Depression Management in Primary Care

    PubMed Central

    Marín, Rigoberto; Martínez, Pablo; Cornejo, Juan P.; Díaz, Berta; Peralta, José; Tala, Álvaro; Rojas, Graciela

    2016-01-01

    Background: In Chile, there are inconsistencies in the management of depression in primary care settings, and the National Depression Program, currently in effect, was implemented without a standardized training program. The objective of this study is to evaluate the acceptability of a training program on the management of depression for primary care health teams. Methods: The study was a randomized controlled trial, and two primary centers from the Metropolitan Region of Santiago were randomly selected to carry out the intervention training program. Pre-post surveys were applied, to evaluate expectations and satisfaction with the intervention, respectively. Descriptive and content analysis was carried out. Result: The sample consisted of 41 health professionals, 56.1% of who reported that their expectations for the intervention were met. All of the training activities were evaluated with scores higher than 6.4 (on a 1–7 scale). The trainers, the methodology, and the learning environment were considered strengths and facilitators of the program, while the limited duration of the training, the logistical problems faced during part of the program, and the lack of educational material were viewed as weaknesses. Conclusion: The intervention was well accepted by primary health care teams. However, the clinical impact in patients still has to be evaluated. PMID:27375531

  3. Testing program overview: What does a good program look like

    SciTech Connect

    Hegedus, A.S. )

    1992-01-01

    A good testing program is vital to the safe, reliable, and efficient operation of a nuclear facility. A testing program consists of more than scheduling, performing, and reviewing results. It includes seven interrelated critical elements, all of which are necessary to provide complete control over a station's testing program. The personnel at Peach Bottom atomic power station wanted to evaluate their testing program. The result was a report that described the framework for a complete testing program. Once the framework was developed, an implementation team was formed to develop the specific plan and schedule for modifying the existing program to conform to the framework.

  4. Acceptance Test Report for Fourth-Generation Hanford Corrosion Monitoring Cabinet

    SciTech Connect

    NORMAN, E.C.

    2000-10-23

    This Acceptance Test Plan (ATP) will document the satisfactory operation of the third-generation corrosion monitoring cabinet (Hiline Engineering Part No.0004-CHM-072-C01). This ATP will be performed by the manufacturer of the cabinet prior to delivery to the site. The objective of this procedure is to demonstrate and document the acceptance of the corrosion monitoring cabinet. The test will consist of a continuity test of the cabinet wiring from the end of cable to be connected to corrosion probe, through the appropriate intrinsic safety barriers and out to the 15 pin D-shell connectors to be connected to the corrosion monitoring instrument. Additional testing will be performed using a constant current and voltage source provided by the corrosion monitoring hardware manufacturer to verify proper operation of corrosion monitoring instrumentation.

  5. Space Station Freedom NiH2 cell testing program

    NASA Technical Reports Server (NTRS)

    Moore, Bruce; Frate, Dave

    1994-01-01

    Testing for the Space Station Freedom Nickel Hydrogen Cell Test Program began in 1990 at Crave Division, Naval Surface Warfare Center. The program has included receipt inspection, random vibration, acceptance, characterization, and life cycle testing of Ni-H2 cells in accordance with the NASA LeRC Interagency Order C-31001-J. A total of 400 Ni-H2 cells have been received at NAVSURFWARCENDIV Crane from three separate manufacturers; Yardney Technical Products (Yardney), Eagle Picher Industries (Eagle Picher), and Gates Energy Products (Gates). Of those, 308 cells distributed among 39 packs have undergone life cycle testing under a test regime simulating low earth orbit conditions. As of 30 September 1993, there are 252 cells assembled into 32 packs still on life cycle test. Since the beginning of the program, failed cells have been detected in all phases of testing. The failures include the following; seven 65 AmpHr and 81 AmpHr Yardney cells were found to be leaking KOH on receipt, one 65 AmpHr Eagle Picher cell failed the acceptance test, one 65 AmpHr Gates cell failed during the characterization test, and six 65 AmpHr Gates cells failed the random vibration test. Of the 39 life cycle packs, testing on seven packs, 56 cells, has been suspended because of low end of discharge voltages. All of the failed life cycle packs were cycled at 60% depth of discharge.

  6. Space Station Freedom NiH2 cell testing program

    NASA Astrophysics Data System (ADS)

    Moore, Bruce; Frate, Dave

    1994-02-01

    Testing for the Space Station Freedom Nickel Hydrogen Cell Test Program began in 1990 at Crave Division, Naval Surface Warfare Center. The program has included receipt inspection, random vibration, acceptance, characterization, and life cycle testing of Ni-H2 cells in accordance with the NASA LeRC Interagency Order C-31001-J. A total of 400 Ni-H2 cells have been received at NAVSURFWARCENDIV Crane from three separate manufacturers; Yardney Technical Products (Yardney), Eagle Picher Industries (Eagle Picher), and Gates Energy Products (Gates). Of those, 308 cells distributed among 39 packs have undergone life cycle testing under a test regime simulating low earth orbit conditions. As of 30 September 1993, there are 252 cells assembled into 32 packs still on life cycle test. Since the beginning of the program, failed cells have been detected in all phases of testing. The failures include the following; seven 65 AmpHr and 81 AmpHr Yardney cells were found to be leaking KOH on receipt, one 65 AmpHr Eagle Picher cell failed the acceptance test, one 65 AmpHr Gates cell failed during the characterization test, and six 65 AmpHr Gates cells failed the random vibration test. Of the 39 life cycle packs, testing on seven packs, 56 cells, has been suspended because of low end of discharge voltages. All of the failed life cycle packs were cycled at 60% depth of discharge.

  7. W-026, acceptance test report TRU empty drum compactor (submittal{number_sign}634)

    SciTech Connect

    Watson, T.L.

    1997-06-18

    On 10/19/96 and 10/21/96, the 06/04/96 version of the Empty Drum Compactor Acceptance Test Procedure was used to perform tests by INET Corporation at the Hanford WRAP facility. The INET compaction components were installed in the Diversified glovebox. The Diversified glovebox and cart and the INET compaction components, EDC HPU and drum centering device constitute the Empty Drum Compactor.

  8. Acceptance test procedure for K basins dose reduction project clean and coat equipment

    SciTech Connect

    Creed, R.F.

    1996-03-11

    This document is the Acceptance Test Procedure (ATP) for the clean and coat equipment designed by Oceaneering Hanford, Inc. under purchase order MDK-XVC-406988 for use in the 105 K East Basin. The ATP provides the guidelines and criteria to test the equipment`s ability to clean and coat the concrete perimeter, divider walls, and dummy elevator pit above the existing water level. This equipment was designed and built in support of the Spent Nuclear Fuel, Dose Reduction Project. The ATP will be performed at the 305 test facility in the 300 Area at Hanford. The test results will be documented in WHC-SD-SNF-ATR-020.

  9. Feasibility and acceptability of a text messaging-based smoking cessation program in ankara, Turkey.

    PubMed

    Ybarra, Michele L; Holtrop, Jodi S; Bağci Bosi, A Tülay; Bilir, Nazmi; Korchmaros, Josephine D; Salih Emri, A K

    2013-08-01

    Data from high-income countries suggest that cell phone-based smoking cessation programs have the potential to affect cessation rates. There is a paucity of research, however, about the feasibility of cell phone-based smoking cessation programs in lower income countries that have higher smoking prevalence rates. A one-arm feasibility and acceptability pilot study of SMS Turkey, a text messaging-based smoking cessation program, was conducted in Ankara, the capital of Turkey. The authors recruited 75 daily smokers who were seriously thinking about quitting in the subsequent 30 days into the 6-week SMS Turkey program. Recruitment was completed in 4 months. Participant retention was high: Almost all (96%) completed the program, and 84% provided 12-week follow-up data. Most (89%) of the respondents who completed the 4-week follow-up measures (n = 38, 51%) said that the text messages were easy to understand and referred to what they were experiencing and feeling during the quitting process (78%). On the basis of intention to treat, 13% of participants (n = 10) reported, at 12-week follow-up, continuous abstinence since their quit date, confirmed by carbon monoxide readings. The cell phone text messaging-based smoking cessation intervention appears feasible and acceptable in Ankara, Turkey. PMID:23627304

  10. Advanced expander test bed program

    NASA Technical Reports Server (NTRS)

    Riccardi, D. P.; Mitchell, J. C.

    1993-01-01

    The Advanced Expander Test Bed (AETB) is a key element in NASA's Space Chemical Engine Technology Program for development and demonstration of expander cycle oxygen/hydrogen engine and advanced component technologies applicable to space engines as well as launch vehicle upper stage engines. The AETB will be used to validate the high-pressure expander cycle concept, investigate system interactions, and conduct investigations of advanced mission focused components and new health monitoring techniques in an engine system environment. The split expander cycle AETB will operate at combustion chamber pressures up to 1200 psia with propellant flow rates equivalent to 20,000 lbf vacuum thrust. Contract work began 27 Apr. 1990. During 1992, a major milestone was achieved with the review of the final design of the oxidizer turbopump in Sep. 1992.

  11. Results of a Feasibility and Acceptability Trial of an Online Smoking Cessation Program Targeting Young Adult Nondaily Smokers

    PubMed Central

    Berg, Carla J.; Schauer, Gillian L.

    2012-01-01

    Despite increases in nondaily smoking among young adults, no prior research has aimed to develop and test an intervention targeting this group. Thus, we aimed to develop and test the feasibility, acceptability, and potential effectiveness of an online intervention targeting college student nondaily smokers. We conducted a one-arm feasibility and acceptability trial of a four-week online intervention with weekly contacts among 31 college student nondaily smokers. We conducted assessments at baseline (B), end of treatment (EOT), and six-week followup (FU). We maintained a 100% retention rate over the 10-week period. Google Analytics data indicated positive utilization results, and 71.0% were satisfied with the program. There were increases (P < .001) in the number of people refraining from smoking for the past 30 days and reducing their smoking from B to EOT and to FU, with additional individuals reporting being quit despite recent smoking. Participants also increased in their perceptions of how bothersome secondhand smoke is to others (P < .05); however, no other attitudinal variables were altered. Thus, this intervention demonstrated feasibility, acceptability, and potential effectiveness among college-aged nondaily smokers. Additional research is needed to understand how nondaily smokers define cessation, improve measures for cessation, and examine theoretical constructs related to smoking among this population. PMID:22570666

  12. Acceptance test procedure, 241-SY-101/241-C-106 shot loading system

    SciTech Connect

    Ostrom, M.J.

    1994-11-01

    This Acceptance Test Procedure is for the 241-SY-101/241-C-106 Shot Loading System. The procedure will test the components of the Shot Loading System and its capability of adequately loading shot into the annular space of the Container. The loaded shot will provide shielding as required for transporting and storage of a contaminated pump after removal from the tank. This test serves as verification that the SLS is acceptable for use in the pump removal operations for Tanks 241-SY-101, 241-C-106 and 241-AY-102. The pump removal operation for these three tanks will be performed by two different organizations with different equipment, but the Shot Loading System will be compatible between the two operations.

  13. The deformable secondary mirror of VLT: final electro-mechanical and optical acceptance test results

    NASA Astrophysics Data System (ADS)

    Briguglio, Runa; Biasi, Roberto; Xompero, Marco; Riccardi, Armando; Andrighettoni, Mario; Pescoller, Dietrich; Angerer, Gerald; Gallieni, Daniele; Vernet, Elise; Kolb, Johann; Arsenault, Robin; Madec, Pierre-Yves

    2014-07-01

    The Deformable Secondary Mirror (DSM) for the VLT ended the stand-alone electro-mechanical and optical acceptance process, entering the test phase as part of the Adaptive Optics Facility (AOF) at the ESO Headquarter (Garching). The VLT-DSM currently represents the most advanced already-built large-format deformable mirror with its 1170 voice-coil actuators and its internal metrology based on co-located capacitive sensors to control the shape of the 1.12m-diameter 2mm-thick convex shell. The present paper reports the final results of the electro-mechanical and optical characterization of the DSM executed in a collaborative effort by the DSM manufacturing companies (Microgate s.r.l. and A.D.S. International s.r.l.), INAF-Osservatorio Astrofisico di Arcetri and ESO. The electro-mechanical acceptance tests have been performed in the company premises and their main purpose was the dynamical characterization of the internal control loop response and the calibration of the system data that are needed for its optimization. The optical acceptance tests have been performed at ESO (Garching) using the ASSIST optical test facility. The main purpose of the tests are the characterization of the optical shell flattening residuals, the corresponding calibration of flattening commands, the optical calibration of the capacitive sensors and the optical calibration of the mirror influence functions.

  14. Managing hospital emergency power testing programs.

    PubMed

    Stymiest, D L

    1997-04-01

    All hospitals must have an emergency power testing program that includes generator load testing and emergency power supply system maintenance. This document examines a management program that uses lessons learned from an emergency power testing program to improve the hospital's facilities and training. PMID:10166993

  15. 47 CFR 73.1620 - Program tests.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... commence program test operations at full power with the FCC in Washington, D.C. This license application... permit. The staff will review the license application and the request for program test authority and... pending the issuance of program test authority at the full effective radiated power by the staff. (3)...

  16. 47 CFR 73.1620 - Program tests.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false Program tests. 73.1620 Section 73.1620... Rules Applicable to All Broadcast Stations § 73.1620 Program tests. (a) Upon completion of construction..., program tests may be conducted in accordance with the following: (1) The permittee of a nondirectional...

  17. 47 CFR 73.1620 - Program tests.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 4 2012-10-01 2012-10-01 false Program tests. 73.1620 Section 73.1620... Rules Applicable to All Broadcast Stations § 73.1620 Program tests. (a) Upon completion of construction..., program tests may be conducted in accordance with the following: (1) The permittee of a nondirectional...

  18. 47 CFR 73.713 - Program tests.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 4 2012-10-01 2012-10-01 false Program tests. 73.713 Section 73.713... International Broadcast Stations § 73.713 Program tests. (a) Upon completion of construction of an international..., the permittee may request authority to conduct program tests. Such request shall be filed with the...

  19. 47 CFR 73.713 - Program tests.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false Program tests. 73.713 Section 73.713... International Broadcast Stations § 73.713 Program tests. (a) Upon completion of construction of an international..., the permittee may request authority to conduct program tests. Such request shall be filed with the...

  20. Modeling of a Parabolic Trough Solar Field for Acceptance Testing: A Case Study

    SciTech Connect

    Wagner, M. J.; Mehos, M. S.; Kearney, D. W.; McMahan, A. C.

    2011-01-01

    As deployment of parabolic trough concentrating solar power (CSP) systems ramps up, the need for reliable and robust performance acceptance test guidelines for the solar field is also amplified. Project owners and/or EPC contractors often require extensive solar field performance testing as part of the plant commissioning process in order to ensure that actual solar field performance satisfies both technical specifications and performance guaranties between the involved parties. Performance test code work is currently underway at the National Renewable Energy Laboratory (NREL) in collaboration with the SolarPACES Task-I activity, and within the ASME PTC-52 committee. One important aspect of acceptance testing is the selection of a robust technology performance model. NREL1 has developed a detailed parabolic trough performance model within the SAM software tool. This model is capable of predicting solar field, sub-system, and component performance. It has further been modified for this work to support calculation at subhourly time steps. This paper presents the methodology and results of a case study comparing actual performance data for a parabolic trough solar field to the predicted results using the modified SAM trough model. Due to data limitations, the methodology is applied to a single collector loop, though it applies to larger subfields and entire solar fields. Special consideration is provided for the model formulation, improvements to the model formulation based on comparison with the collected data, and uncertainty associated with the measured data. Additionally, this paper identifies modeling considerations that are of particular importance in the solar field acceptance testing process and uses the model to provide preliminary recommendations regarding acceptable steady-state testing conditions at the single-loop level.

  1. Mast material test program (MAMATEP)

    NASA Technical Reports Server (NTRS)

    Ciancone, Michael L.; Rutledge, Sharon K.

    1988-01-01

    The Mast Material Test Program (MAMATEP) at NASA Lewis is discussed. Objectives include verifying the need for, and evaluating the performance of, various protection techniques for the Solar Array Assembly mast of the Space Station Photovoltaic Power Module. Mast material samples were evaluated in terms of mass and bending modulus, measured before and after environmental exposure. Test environments included atomic oxygen exposure (RF plasma asher), thermal cycling, and mechanical flexing. Protective coatings included CV-1144 silicon, a Ni/Au/InSn eutectic, and an open weave, Al braid. Results indicate that unprotected samples degrade in an atomic oxygen environment at a steady rate. Open weave, Al braid offers little protection for the fiberglass-epoxy sample in an asher environment. Ni/Au/InSn eutectic offers excellent protection in an asher environment prior to thermal cycling and mechanical flexing. Long duration asher results from unprotected samples indicate that, even though the fiberglass-epoxy degrades, a protection technique may not be necessary to ensure structural integrity. However, a protection technique may be desirable to limit or contain the amount of debris generated by the degradation of the fiberglass-epoxy.

  2. Acceptability and Feasibility Results of a Strength-Based Skills Training Program for Dementia Caregiving Dyads

    PubMed Central

    Judge, Katherine S.; Yarry, Sarah J.; Orsulic-Jeras, Silvia

    2010-01-01

    Purpose: The current article provides an in-depth description of a dyadic intervention for individuals with dementia and their family caregivers. Using a strength-based approach, caregiving dyads received skills training across 5 key areas: (a) education regarding dementia and memory loss, (b) effective communication, (c) managing memory loss, (d) staying active, and (e) recognizing emotions and behaviors. Results of the acceptability and feasibility of the intervention protocols are also presented. Design and Methods: Caregiving dyads were randomly assigned to participate in the intervention. Participants in the treatment condition were asked to complete a series of evaluation questions after each intervention session and an overall evaluation of the program. Data were also collected from the intervention specialists who implemented the protocols. Results: Overall, the evaluation data indicated that the content and process of the intervention were viewed as highly acceptable and feasible by both participants and intervention specialists. Implications: This article highlights the merit of using a strength-based approach for working with caregiving dyads with dementia and how a single intervention protocol can be used to address the goals of both care partners. Furthermore, the intervention program was found to be highly acceptable and feasible, which is an important aspect of developing dyadic protocols. PMID:19808841

  3. Development and integration of the Army's Advanced Multispectral Simulation Test Acceptance Resource (AMSTAR) HWIL facilities

    NASA Astrophysics Data System (ADS)

    LeSueur, Kenneth G.; Lowry, William; Morris, Joe

    2006-05-01

    The Advanced Multispectral Simulation Test Acceptance Resource (AMSTAR) is a suite of state-of-the-art hardware-in-the-loop (HWIL) simulation / test capabilities designed to meet the life-cycle testing needs of multi-spectral systems. This paper presents the major AMSTAR facility design concepts and each of the Millimeter Wave (MMW), Infrared (IR), and Semi-Active Laser (SAL) in-band scene generation and projection system designs. The emergence of Multispectral sensors in missile systems necessitates capabilities such as AMSTAR to simultaneous project MMW, IR, and SAL wave bands into a common sensor aperture.

  4. Development and integration of the Army's advanced multispectral simulation test acceptance resource (AMSTAR) HWIL facilities

    NASA Astrophysics Data System (ADS)

    LeSueur, Kenneth G.; Lowry, William; Morris, Joe

    2005-05-01

    The Advanced Multispectral Simulation Test Acceptance Resource (AMSTAR) is a suite of state-of-the-art Hardware-In-the-Loop (HWIL) simulation / test capabilities designed to meet the life-cycle testing needs of multi-spectral systems. This paper presents the major AMSTAR facility design concepts and each of the Millimeter Wave (MMW), Infrared (IR), and Semi-Active Laser (SAL) in-band scene generation and projection system designs. The emergence of Multispectral sensors in missile systems necessitates capabilities such as AMSTAR to simultaneous project MMW, IR, and SAL wave bands into a common sensor aperture.

  5. Design tradeoffs in the development of the advanced multispectral simulation test acceptance resource (AMSTAR) HWIL facilities

    NASA Astrophysics Data System (ADS)

    LeSueur, Kenneth G.; Almendinger, Frank J.

    2007-04-01

    The Army's Advanced Multispectral Simulation Test Acceptance Resource (AMSTAR) is a suite of missile Hardware-In-the-Loop (HWIL) simulation / test capabilities designed to support testing from concept through production. This paper presents the design tradeoffs that were conducted in the development of the AMSTAR sensor stimulators and the flight motion simulators. The AMSTAR facility design includes systems to stimulate each of the Millimeter Wave (MMW), Infrared (IR), and Semi-Active Laser (SAL) sensors. The flight motion simulator (FMS) performance was key to the success of the simulation but required many concessions to accommodate the design considerations for the tri-mode stimulation systems.

  6. The Effect of a Summer MCAT Performance Improvement Program on Minority Medical Student Acceptance

    PubMed Central

    Medina, Miguel A.

    1987-01-01

    The effect of a commercial Medical College Admission Test (MCAT) review course on MCAT retake scores and acceptance into medical school for a group of minority students is reported. The review course enhanced MCAT performance in all of the subgroups. The increase in total MCAT score was more pronounced in students with an initial MCAT score below 36 or a high undergraduate total or science grade point average. Results suggest a relationship between MCAT performance and medical school admission. PMID:3625795

  7. Development of an integrative cessation program for co-smokers of cigarettes and cannabis: demand analysis, program description, and acceptability

    PubMed Central

    2013-01-01

    Background Tobacco and cannabis use are strongly interrelated, but current national and international cessation programs typically focus on one substance, and address the other substance either only marginally or not at all. This study aimed to identify the demand for, and describe the development and content of, the first integrative group cessation program for co-smokers of cigarettes and cannabis. Methods First, a preliminary study using expert interviews, user focus groups with (ex-)smokers, and an online survey was conducted to investigate the demand for, and potential content of, an integrative smoking cessation program (ISCP) for tobacco and cannabis co-smokers. This study revealed that both experts and co-smokers considered an ISCP to be useful but expected only modest levels of readiness for participation. Based on the findings of the preliminary study, an interdisciplinary expert team developed a course concept and a recruitment strategy. The developed group cessation program is based on current treatment techniques (such as motivational interviewing, cognitive behavioural therapy, and self-control training) and structured into six course sessions. The program was evaluated regarding its acceptability among participants and course instructors. Results Both the participants and course instructors evaluated the course positively. Participants and instructors especially appreciated the group discussions and the modules that were aimed at developing personal strategies that could be applied during simultaneous cessation of tobacco and cannabis, such as dealing with craving, withdrawal, and high-risk situations. Conclusions There is a clear demand for a double cessation program for co-users of cigarettes and cannabis, and the first group cessation program tailored for these users has been developed and evaluated for acceptability. In the near future, the feasibility of the program will be evaluated. Trial registration Current Controlled Trials ISRCTN15248397

  8. The Preventing Relational Aggression in Schools Everyday Program: A Preliminary Evaluation of Acceptability and Impact

    PubMed Central

    Leff, Stephen S.; Waasdorp, Tracy Evian; Paskewich, Brooke; Gullan, Rebecca Lakin; Jawad, Abbas F.; MacEvoy, Julie Paquette; Feinberg, Betsy E.; Power, Thomas J.

    2011-01-01

    Despite recent research suggesting that relationally aggressive behaviors occur frequently and may lead to physically aggressive actions within urban school settings, there has been little prior research to develop and evaluate relational aggression prevention efforts within the urban schools. The current article describes the development and preliminary evaluation of the Preventing Relational Aggression in Schools Everyday (PRAISE) Program. PRAISE is a 20-session classroom-based universal prevention program, designed to be appropriate and responsive to the needs of youth within the urban school context. Results suggest strong acceptability for the program and feasibility of implementation. Further, the program was especially beneficial for girls. For instance, girls in classrooms randomly assigned to the PRAISE Program demonstrated higher levels of knowledge for social information processing and anger management techniques and lower levels of relational aggression following treatment as compared to similar girls randomly assigned to a no-treatment control condition. Further, relationally aggressive girls exhibited similar benefits from the program (greater knowledge and lower levels of relational aggression) plus lower levels of overt aggression following treatment as compared to relationally aggressive girls within the control classrooms. In contrast, the program was not associated with improvements for boys across most measures. The significance and implications of the findings for research and practice are discussed. PMID:21686034

  9. Usability and Acceptability of a Web-Based Program for Chemotherapy-Induced Peripheral Neuropathy.

    PubMed

    Tofthagen, Cindy; Kip, Kevin E; Passmore, Denise; Loy, Ian; Berry, Donna L

    2016-07-01

    Chemotherapy-induced neuropathy is a painful and debilitating adverse effect of certain chemotherapy drugs. There have not been any patient-centered, easily accessible Web-based interventions to assist with self-management of chemotherapy-induced neuropathy. The aims of this study were to evaluate usability and acceptability and to estimate an effect size of a Web-based intervention for assessing and managing chemotherapy-induced neuropathy. Participants (N = 14) were instructed to complete the Creativity, Optimism, Planning, and Expert Information for Chemotherapy-Induced Peripheral Neuropathy program and provide verbal responses to the program. Participants completed the Chemotherapy Induced Peripheral Neuropathy Assessment Tool and Post-Study System Usability Questionnaire. Iterative changes were made to the COPE-CIPN. Participants were asked to provide feedback on the revised COPE-CIPN, repeat the Chemotherapy Induced Peripheral Neuropathy Assessment Tool, and evaluate acceptability using the Acceptability e-Scale. The COPE-CIPN demonstrated high usability (mean, 1.98 [SD, 1.12]) and acceptability (mean, 4.40 [SD, 0.52]). Comments indicated that the interface was easy to use, and the information was helpful. While neuropathy symptoms continued to increase in this group of patients receiving neurotoxic chemotherapy, there was a decrease in mean level of interference with activities from 53.71 to 39.29 over 3 to 4 months, which indicated a moderate effect (d = 0.39) size. The COPE-CIPN may be a useful intervention to support self-management of chemotherapy-induced neuropathy. PMID:27116414

  10. Healing Our Women for Transgender Women: Adaptation, Acceptability, and Pilot Testing.

    PubMed

    Collier, Kate L; Colarossi, Lisa G; Hazel, Daphne S; Watson, Kim; Wyatt, Gail E

    2015-10-01

    Healing Our Women (HOW) is a group-level HIV risk-reduction intervention developed to address the role of prior sexual victimization in HIV risk and protective behaviors among HIV-positive women of color. This article describes the process of adapting HOW for transgender women of color in New York City in accordance with CDC guidance for the adaptation of efficacious interventions. Twenty-one transgender women were enrolled in a study to evaluate the acceptability and fidelity of the adapted intervention, and to assess HIV knowledge, depressive symptoms, coping, condom use self-efficacy, and condom use via pre- and post-intervention surveys. We found the adapted program to be feasible to implement and acceptable to participants. We also found significant decreases in depressive symptoms and increases in positive coping from pre- to post-intervention, although replication with a larger sample and a control group comparison is needed to determine efficacy with this population. PMID:26485232

  11. Test report for run-in acceptance testing of Project W-151 300 HP mixing pumps

    SciTech Connect

    Berglin, B.G.

    1998-01-29

    This report documents the results of a performance demonstration and operational checkout of three 300 HP mixer pumps in accordance with WHC-SD-WI51-TS-001 ``Mixer Pump Test Specification for Project W-151`` and Statement of Work 8K520-EMN-95-004 ``Mixer Pump Performance Demonstration at MASF`` in the 400 Area Maintenance and Storage Facility (MASF) building. Testing of the pumps was performed by Fast Flux Test Facility (FFTF) Engineering and funded by the Tank Waste Remediation System (TWRS) Project W-151. Testing began with the first pump on 04-01-95 and ended with the third pump on 11-01-96. Prior to testing, the MASF was modified and prepared to meet the pump testing requirements set forth by the Test Specification and the Statement of Work.

  12. Social trust, risk perceptions and public acceptance of recycled water: testing a social-psychological model.

    PubMed

    Ross, Victoria L; Fielding, Kelly S; Louis, Winnifred R

    2014-05-01

    Faced with a severe drought, the residents of the regional city of Toowoomba, in South East Queensland, Australia were asked to consider a potable wastewater reuse scheme to supplement drinking water supplies. As public risk perceptions and trust have been shown to be key factors in acceptance of potable reuse projects, this research developed and tested a social-psychological model of trust, risk perceptions and acceptance. Participants (N = 380) were surveyed a few weeks before a referendum was held in which residents voted against the controversial scheme. Analysis using structural equation modelling showed that the more community members perceived that the water authority used fair procedures (e.g., consulting with the community and providing accurate information), the greater their sense of shared identity with the water authority. Shared social identity in turn influenced trust via increased source credibility, that is, perceptions that the water authority is competent and has the community's interest at heart. The findings also support past research showing that higher levels of trust in the water authority were associated with lower perceptions of risk, which in turn were associated with higher levels of acceptance, and vice versa. The findings have a practical application for improving public acceptance of potable recycled water schemes. PMID:24603028

  13. W-026 acceptance test report system integration equipment (SIE)(submittal {number_sign} 018.6.A)

    SciTech Connect

    Watson, T.L.

    1997-01-27

    Acceptance testing of the System Integration Equipment (SIE) at Hanford was performed in two stages. The first was inconclusive, and resulted in a number of findings. These finding. are summarized as part of this report. The second stage of testing addressed these findings, and performed full system testing per the approved test procedure. This report includes summaries of all testing, results and finding.. Although the SIE did not in some cases perform as required for plant operations, it did perform per the system specification. (These discrepancies were noted and are addressed elsewhere.) Following testing, the system was formaLLy accepted. Documentation of this acceptance is incLuded in this report.

  14. Acceptability of HPV vaccine for males and preferences for future education programs among Appalachian residents.

    PubMed

    Reiter, Paul L; Oldach, Benjamin R; Randle, Katherine E; Katz, Mira L

    2014-03-01

    Appalachia is a geographic region with several disparities related to human papillomavirus (HPV) infection, yet little is known about acceptability of HPV vaccine for males among Appalachian residents. HPV vaccine acceptability and preferences for future HPV vaccine education programs were examined among residents of Appalachian Ohio. Focus groups and in-depth interviews were conducted with Appalachian Ohio residents between July and October 2011. Participants (n = 102 from 24 focus groups and 5 in-depth interviews) included four key stakeholder groups: health care providers, community leaders, parents with adolescent sons, and young adult men ages 18 to 26 years. Support for vaccinating males against HPV was high among participants, despite low awareness and knowledge about HPV vaccine for males. Participants reported three categories of potential barriers to vaccinating males against HPV: concerns about vaccine safety and side effects, access to care and vaccination logistics, and gender and cultural issues. Participants reported that HPV vaccine was viewed as being only for females in their communities and that receiving the vaccine may be emasculating or embarrassing to males. Participants suggested that future HPV vaccine education programs mainly target parents, include basic information about HPV-related diseases and HPV vaccine (e.g., number of doses, cost), and present the vaccine as having the potential to prevent cancer (as opposed to preventing genital warts). Acceptability of HPV vaccine for males was high among residents of Appalachian Ohio. Future HPV vaccine education programs in Appalachia should address common potential barriers to vaccination and help destigmatize vaccination among males. PMID:24085197

  15. Factors Associated with Acceptability of HIV Self-Testing Among Health Care Workers in Kenya

    PubMed Central

    Kalibala, Samuel; Tun, Waimar; Cherutich, Peter; Nganga, Anne; Oweya, Erick; Oluoch, Patricia

    2016-01-01

    Health care workers (HCWs) in sub-Saharan Africa are at a high risk of HIV infection from both sexual and occupational exposures. However, many do not seek HIV testing. This paper examines the acceptability of an unsupervised facility-based HIV self-testing (HIV-ST) intervention among HCWs and their partners and factors associated with uptake of HIVST among HCWs. HCWs in seven large Kenyan hospitals were invited to participate in pre-HIVST information sessions during which they were offered HIVST kits to take home for self-testing. A post-intervention survey was conducted among 765 HCWs. Forty-one percent attended the information session; of those, 89 % took the HIVST kits and of those, 85 % self-tested. Thirty-four percent of surveyed HCWs used the HIVST to test themselves. Of those who took the HIVST kit and had partners, 73 % gave the kit to their partner and 86 % of them indicated their partner self-tested. Factors positively associated with use of the HIVST on self were being female, being single, and being a HCW from Homa Bay Hospital (located in a high HIV prevalence area). HIVST is acceptable to HCWs and their partners. However, strategies are needed to increase HCWs attendance at pre-implementation information sessions. PMID:24974123

  16. TESTING INDOOR AIR PRODUCTS: ONE APPROACH TO DEVELOPING WIDELY ACCEPTED PROTOCOLS

    EPA Science Inventory

    The paper describes an approach to developing widely acce ted products for testing indoor air products. [NOTE: Research Triangle Institute (RTI) is a partner in the U.S. Environmental Protection Agency's (EPA's) Environmental Technology Verification (ETV) Program with responsibil...

  17. Forward Skirt Structural Testing on the Space Launch System (SLS) Program

    NASA Technical Reports Server (NTRS)

    Lohrer, J. D.; Wright, R. D.

    2016-01-01

    Structural testing was performed to evaluate heritage forward skirts from the Space Shuttle program for use on the NASA Space Launch System (SLS) program. Testing was needed because SLS ascent loads are 35% higher than Space Shuttle loads. Objectives of testing were to determine margins of safety, demonstrate reliability, and validate analytical models. Testing combined with analysis was able to show heritage forward skirts were acceptable to use on the SLS program.

  18. Geoscience Laser Altimeter System (GLAS) Instrument: Flight Loop Heat Pipe (LHP) Acceptance Thermal Vacuum Test

    NASA Technical Reports Server (NTRS)

    Baker, Charles; Butler, Dan; Ku, Jentung; Grob, Eric; Swanson, Ted; Nikitkin, Michael; Powers, Edward I. (Technical Monitor)

    2001-01-01

    Two loop heat pipes (LHPs) are to be used for tight thermal control of the Geoscience Laser Altimeter System (GLAS) instrument, planned for flight in late 2001. The LHPs are charged with Propylene as a working fluid. One LHP will be used to transport 110 W from a laser to a radiator, the other will transport 160 W from electronic boxes to a separate radiator. The application includes a large amount of thermal mass in each LHP system and low initial startup powers. The initial design had some non-ideal flight design compromises, resulted in a less than ideal charge level for this design concept with a symmetrical secondary wick. This less than ideal charge was identified as the source of inadequate performance of the flight LHPs during the flight thermal vacuum test in October of 2000. We modified the compensation chamber design, re-built and charged the LHPs for a final LHP acceptance thermal vacuum test. This test performed March of 2001 was 100% successful. This is the last testing to be performed on the LHPs prior to instrument thermal vacuum test. This sensitivity to charge level was shown through varying the charge on a Development Model Loop Heat Pipe (DM LHP) and evaluating performance at various fill levels. At lower fills similar to the original charge in the flight units, the same poor performance was observed. When the flight units were re-designed and filled to the levels similar to the initial successful DM LHP test, the flight units also successfully fulfilled all requirements. This final flight Acceptance test assessed performance with respect to startup, low power operation, conductance, and control heater power, and steady state control. The results of the testing showed that both LHPs operated within specification. Startup on one of the LHPs was better than the other LHP because of the starter heater placement and a difference in evaporator design. These differences resulted in a variation in the achieved superheat prior to startup. The LHP with

  19. An Elaboration Likelihood Model Based Longitudinal Analysis of Attitude Change during the Process of IT Acceptance via Education Program

    ERIC Educational Resources Information Center

    Lee, Woong-Kyu

    2012-01-01

    The principal objective of this study was to gain insight into attitude changes occurring during IT acceptance from the perspective of elaboration likelihood model (ELM). In particular, the primary target of this study was the process of IT acceptance through an education program. Although the Internet and computers are now quite ubiquitous, and…

  20. 13 CFR 124.503 - How does SBA accept a procurement for award through the 8(a) BD program?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... under the 8(a) BD program. (g) Basic Ordering Agreements (BOAs). A Basic Ordering Agreement (BOA) is not a contract under the FAR. See 48 CFR 16.703(a). Each order to be issued under the BOA is an... BOA in addition to offering and accepting the BOA itself. (1) SBA will not accept for award on a...

  1. 46 CFR 159.007-7 - Application for acceptance for production inspections and tests: Coast Guard action.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 6 2013-10-01 2013-10-01 false Application for acceptance for production inspections and tests: Coast Guard action. 159.007-7 Section 159.007-7 Shipping COAST GUARD, DEPARTMENT OF....007-7 Application for acceptance for production inspections and tests: Coast Guard action. (a)...

  2. 46 CFR 159.007-7 - Application for acceptance for production inspections and tests: Coast Guard action.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 6 2014-10-01 2014-10-01 false Application for acceptance for production inspections and tests: Coast Guard action. 159.007-7 Section 159.007-7 Shipping COAST GUARD, DEPARTMENT OF....007-7 Application for acceptance for production inspections and tests: Coast Guard action. (a)...

  3. 46 CFR 159.007-7 - Application for acceptance for production inspections and tests: Coast Guard action.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 6 2011-10-01 2011-10-01 false Application for acceptance for production inspections and tests: Coast Guard action. 159.007-7 Section 159.007-7 Shipping COAST GUARD, DEPARTMENT OF....007-7 Application for acceptance for production inspections and tests: Coast Guard action. (a)...

  4. 46 CFR 159.007-7 - Application for acceptance for production inspections and tests: Coast Guard action.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Application for acceptance for production inspections and tests: Coast Guard action. 159.007-7 Section 159.007-7 Shipping COAST GUARD, DEPARTMENT OF....007-7 Application for acceptance for production inspections and tests: Coast Guard action. (a)...

  5. ETV - VERIFICATION TESTING (ENVIRONMENTAL TECHNOLOGY VERIFICATION PROGRAM)

    EPA Science Inventory

    Verification testing is a major component of the Environmental Technology Verification (ETV) program. The ETV Program was instituted to verify the performance of innovative technical solutions to problems that threaten human health or the environment and was created to substantia...

  6. HIV coping self-efficacy: a key to understanding stigma and HIV test acceptance among incarcerated men in Jamaica.

    PubMed

    Andrinopoulos, Katherine; Kerrigan, Deanna; Figueroa, J Peter; Reese, Richard; Ellen, Jonathan M

    2010-03-01

    Although prisons have been noted as important venues for HIV testing, few studies have explored the factors within this context that may influence HIV test acceptance. Moreover, there is a dearth of research related to HIV and incarcerated populations in middle and low-income countries, where both the burden of HIV and the number of people incarcerated is higher compared to high-income countries. This study explores the relationship between HIV coping self-efficacy, HIV-related stigma, and HIV test acceptance in the largest prisons in Jamaica. A random sample of inmates (n=298) recruited from an HIV testing demonstration project were asked to complete a cross-sectional quantitative survey. Participants who reported high HIV coping self-efficacy (adjusted odds ratio (AOR) 1.86: 95% confidence interval CI 1.24-2.78, p-value=0.003), some perceived risk of HIV (AOR 2.51: 95% (CI) 1.57-4.01, p-value=0.000), and low HIV testing stigma (AOR 1.71: 95% CI 1.05-2.79, p-value=0.032) were more likely to test for HIV. Correlates of HIV coping self-efficacy included external and internal HIV stigma (AOR 1.28: 95% CI 1.25-1.32, p-value=0.000 and AOR 1.76: 95% CI 1.34-2.30, p-value=0.000, respectively), social support (AOR 2.09: 95% CI 1.19-3.68, p-value=0.010), and HIV knowledge (AOR 2.33: 95% CI 1.04-5.22, p-value=0.040). Policy and programs should focus on the interrelationships of these constructs to increase participation in HIV testing in prison. PMID:20390514

  7. Matching Interventions to Children's Mental Health Needs: Feasibility and Acceptability of a Pilot School-Based Trauma Intervention Program

    ERIC Educational Resources Information Center

    Brown, Elissa J.; McQuaid, Jennifer; Farina, Lana; Ali, Rehana; Winnick-Gelles, Amy

    2006-01-01

    The primary goal was to develop and implement a school-based, trauma-specific intervention program for inner-city children exposed to the World Trade Center attacks on September 11th, 2001. The feasibility and acceptability of the program, and its research component, were examined. The efficacy of the program was evaluated in a pilot study.…

  8. Adolescent Suicide Prevention: Gender Differences in Students' Perceptions of the Acceptability and Intrusiveness of School-Based Screening Programs

    ERIC Educational Resources Information Center

    Eckert, Tanya L.; Miller, David N.; Riley-Tillman, T. Christopher; DuPaul, George J.

    2006-01-01

    Suicidal behavior is a significant problem among adolescents in the United States. Three types of school-based suicide prevention programs have been proposed to address this problem including curriculum programs, staff in-service training, and school-wide screening. The relative acceptability of these three programs among older adolescents was…

  9. Space Shuttle wind tunnel testing program

    NASA Technical Reports Server (NTRS)

    Whitnah, A. M.; Hillje, E. R.

    1984-01-01

    A major phase of the Space Shuttle Vehicle (SSV) Development Program was the acquisition of data through the space shuttle wind tunnel testing program. It became obvious that the large number of configuration/environment combinations would necessitate an extremely large wind tunnel testing program. To make the most efficient use of available test facilities and to assist the prime contractor for orbiter design and space shuttle vehicle integration, a unique management plan was devised for the design and development phase. The space shuttle program is reviewed together with the evolutional development of the shuttle configuration. The wind tunnel testing rationale and the associated test program management plan and its overall results is reviewed. Information is given for the various facilities and models used within this program. A unique posttest documentation procedure and a summary of the types of test per disciplines, per facility, and per model are presented with detailed listing of the posttest documentation.

  10. ENRAF Series 854 Advanced Technology Gauge (ATG) with SPU II card for Leak Detector Use Acceptance Test Procedure

    SciTech Connect

    SMITH, S.G.

    1999-10-21

    The following Acceptance Test Procedure was written to test the ENRAF series 854 ATG with SPU II card prior to installation in the Tank Farms. The procedure sets various parameters and verifies the gauge and alarms functionality.

  11. Verification and performance tests of HYCAR program

    NASA Technical Reports Server (NTRS)

    Bhatia, Veena

    1985-01-01

    The HYCAR program simulates the network protocols of HYPERchannel and Fiber Optic Demonstration System (FODS) and other related protocols. Verification tests of the program were conducted using the FODS protocol. The tests validated the operation of the program through deterministic and analytical means. Extensive experimentation with the simulator produced a set of performance characteristics for the FODS protocol under varied loading conditions. These characteristics are consistent with those expected, and are documented with the validation tests.

  12. MAC Version 3.2, MBA Version 1.3 acceptance test summary report

    SciTech Connect

    Russell, V.K.

    1994-11-02

    The K Basins Materials Accounting (MAC) and Materials Balance (MBA) programs had the Paradox Conversion to 4.0 ATP run to check out the systems. This report describes the results of the test and provides the signoff sheets associated with the testing. The test primarily concentrated on verifying that MAC and MBA software would run properly in the Paradox 4.0 environment. Changes in the MAC and MBA programs were basically limited to superficial items needed to accommodate the enhanced method of execution.

  13. Social Network and Risk-Taking Behavior Most Associated with Rapid HIV Testing, Circumcision, and Preexposure Prophylaxis Acceptability Among High-Risk Indian Men

    PubMed Central

    Kumar, Rupali; Dandona, Rakhi; Kumar, Prem; Kumar, Anil; Lakshmi, Vemu; Laumann, Edward; Mayer, Kenneth; Dandona, Lalit

    2012-01-01

    Abstract Indian truck drivers and their younger apprentice drivers are at increased risk of HIV infection. We determine network and risk practices associated with willingness to adopt HIV prevention interventions currently not being used in India: rapid HIV testing, circumcision, and preexposure prophylaxis (PrEP) in order to inform the National AIDS Control Program (NACP). Truck drivers and truck cleaners were systematically recruited to participate in a social network and risk survey in Hyderabad, Southern India. Three separate composite measures of acceptability of rapid HIV testing, circumcision, and PrEP acceptability were utilized to independently assess the relationship of these prevention interventions with risk-practices and social network characteristics. An 89% participation rate yielded 1602 truck drivers and truck cleaners with 54.2% younger than 30 years of age and 2.8% HIV infected. Twenty-five percent of respondents reported sex with female sex workers (FSW) and 5% with men (MSM). Rapid testing, circumcision, and PrEP acceptability were 97.4%, 9.1%, and 85.9%, respectively. Participants reporting prosocial network characteristics were more accepting of rapid testing (adjusted odds ratio [AORs] 3.07–6.71; p<0.05) and demonstrated variable PrEP acceptability (AORs 0.08–2.22; p<0.001). Sex with FSWs was associated with PrEP acceptability (AOR 4.27; p<0.001); sex with MSM was associated with circumcision acceptability only (AOR 2.66; p<0.01). Social network factors and risk-practices were associated with novel prevention acceptability, but not consistently across intervention type and with variable directionality. The NACP will need to consider that intervention uptake may likely be most successful when efforts are targeted to individuals with specific behavior and social network characteristics. PMID:22973951

  14. Utility-Scale Parabolic Trough Solar Systems: Performance Acceptance Test Guidelines, April 2009 - December 2010

    SciTech Connect

    Kearney, D.

    2011-05-01

    Prior to commercial operation, large solar systems in utility-size power plants need to pass a performance acceptance test conducted by the engineering, procurement, and construction (EPC) contractor or owners. In lieu of the present absence of ASME or other international test codes developed for this purpose, the National Renewable Energy Laboratory has undertaken the development of interim guidelines to provide recommendations for test procedures that can yield results of a high level of accuracy consistent with good engineering knowledge and practice. The Guidelines contained here are specifically written for parabolic trough collector systems with a heat-transport system using a high-temperature synthetic oil, but the basic principles are relevant to other CSP systems.

  15. Acceptance Performance Test Guideline for Utility Scale Parabolic Trough and Other CSP Solar Thermal Systems: Preprint

    SciTech Connect

    Mehos, M. S.; Wagner, M. J.; Kearney, D. W.

    2011-08-01

    Prior to commercial operation, large solar systems in utility-size power plants need to pass a performance acceptance test conducted by the engineering, procurement, and construction (EPC) contractor or owners. In lieu of the present absence of ASME or other international test codes developed for this purpose, the National Renewable Energy Laboratory has undertaken the development of interim guidelines to provide recommendations for test procedures that can yield results of a high level of accuracy consistent with good engineering knowledge and practice. Progress on interim guidelines was presented at SolarPACES 2010. Significant additions and modifications were made to the guidelines since that time, resulting in a final report published by NREL in April 2011. This paper summarizes those changes, which emphasize criteria for assuring thermal equilibrium and steady state conditions within the solar field.

  16. 77 FR 73056 - Initial Test Programs for Water-Cooled Nuclear Power Plants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-07

    ...The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment draft regulatory guide (DG), DG-1259, ``Initial Test Programs for Water-Cooled Nuclear Power Plants.'' This guide describes the general scope and depth that the staff of the NRC considers acceptable for Initial Test Programs (ITPs) for light water cooled nuclear power...

  17. Multi Canister Overpack (MCO) Combustible Gas Management Leak Test Acceptance Criteria (OCRWM)

    SciTech Connect

    SHERRELL, D.L.

    2000-10-10

    The purpose of this document is to support the Spent Nuclear Fuel Project's combustible gas management strategy while avoiding the need to impose any requirements for oxygen free atmospheres within storage tubes that contain multi-canister overpacks (MCO). In order to avoid inerting requirements it is necessary to establish and confirm leak test acceptance criteria for mechanically sealed and weld sealed MCOs that are adequte to ensure that, in the unlikely event the leak test results for any MCO were to approach either of those criteria, it could still be handled and stored in stagnant air without compromising the SNF Project's overall strategy to prevent accumulation of combustible gas mixtures within MCOs or within their surroundings. To support that strategy, this document: (1) establishes combustible gas management functions and minimum functional requirements for the MCO's mechanical seals and closure weld(s); (2) establishes a maximum practical value for the minimum required initial MCO inert backfill gas pressure; and (3) based on items 1 and 2, establishes and confirms leak test acceptance criteria for the MCO's mechanical seal and final closure weld(s).

  18. Acceptance Testing of the Vapor Phase Catalytic Ammonia Removal Engineering Development Unit

    NASA Technical Reports Server (NTRS)

    Flynn, Michael; Fisher, John; Kliss, Mark; Tleimat, Maher; Quinn, Gregory; Fort, James; Nalette, Tim; Baker, Gale

    2005-01-01

    This paper describes the results of acceptance testing of the Vapor Phase Catalytic Ammonia Removal (VPCAR) technology. The VPCAR technology is currently being developed by NASA as a Mars transit vehicle water recycling system. NASA has recently completed a grant to develop a next generation VPCAR system. This grant was peer reviewed and funded through the Advanced Life Support (ALS) National Research Announcement (NRA). The grant funded a contract with Water Reuse Technology Inc. to construct an engineering development unit. This contract concluded with the shipment of the final deliverable to NASA on 8/31/03. The objective of the acceptance testing was to characterize the performance of this new system. This paper presents the results of mass power, and volume measurements for the delivered system. In addition, product water purity analysis for a Mars transit mission and a planetary base wastewater ersatz are provided. Acoustic noise levels, interface specifications and system reliability results are also discussed. An assessment of the readiness of the technology for human testing and recommendations for future improvements are provided.

  19. International Space Station Environmental Control and Life Support System Acceptance Testing for the Pressurized Mating Adapters

    NASA Technical Reports Server (NTRS)

    Williams, David E.

    2008-01-01

    The International Space Station (ISS) Pressurized Mating Adapters (PMAs) Environmental Control and Life Support (ECLS) System is comprised of three subsystems: Atmosphere Control and Supply (ACS), Temperature and Humidity Control (THC), and Water Recovery and Management (WRM). PMAs 1 and 2 flew to ISS on Flight 2A and Pressurized Mating Adapter (PMA) 3 flew to ISS on Flight 3A. This paper provides a summary of the PMAs ECLS design and a detailed discussion of the ISS ECLS Acceptance Testing methodologies utilized for the PMAs.

  20. Test-Anxiety Program and Test Gains with Nursing Classes

    ERIC Educational Resources Information Center

    Evans, Ginger; Ramsey, Gary; Driscoll, Richard

    2010-01-01

    Nursing programs can be highly stressful, and nursing students have been found to be more test-anxious than other students. The present investigation examines a practical program to reduce test-anxiety impairment and improve academic performance for a significant number of highly anxious nursing students. Incoming nursing students were screened…

  1. Acceptance/operational test procedure 241-AN-107 Video Camera System

    SciTech Connect

    Pedersen, L.T.

    1994-11-18

    This procedure will document the satisfactory operation of the 241-AN-107 Video Camera System. The camera assembly, including camera mast, pan-and-tilt unit, camera, and lights, will be installed in Tank 241-AN-107 to monitor activities during the Caustic Addition Project. The camera focus, zoom, and iris remote controls will be functionally tested. The resolution and color rendition of the camera will be verified using standard reference charts. The pan-and-tilt unit will be tested for required ranges of motion, and the camera lights will be functionally tested. The master control station equipment, including the monitor, VCRs, printer, character generator, and video micrometer will be set up and performance tested in accordance with original equipment manufacturer`s specifications. The accuracy of the video micrometer to measure objects in the range of 0.25 inches to 67 inches will be verified. The gas drying distribution system will be tested to ensure that a drying gas can be flowed over the camera and lens in the event that condensation forms on these components. This test will be performed by attaching the gas input connector, located in the upper junction box, to a pressurized gas supply and verifying that the check valve, located in the camera housing, opens to exhaust the compressed gas. The 241-AN-107 camera system will also be tested to assure acceptable resolution of the camera imaging components utilizing the camera system lights.

  2. For your interest? The ethical acceptability of using non-invasive prenatal testing to test 'purely for information'.

    PubMed

    Deans, Zuzana; Clarke, Angus J; Newson, Ainsley J

    2015-01-01

    Non-invasive prenatal testing (NIPT) is an emerging form of prenatal genetic testing that provides information about the genetic constitution of a foetus without the risk of pregnancy loss as a direct result of the test procedure. As with other prenatal tests, information from NIPT can help to make a decision about termination of pregnancy, plan contingencies for birth or prepare parents to raise a child with a genetic condition. NIPT can also be used by women and couples to test purely 'for information'. Here, no particular action is envisaged following the test; it is motivated entirely by an interest in the result. The fact that NIPT can be performed without posing a risk to the pregnancy could give rise to an increase in such requests. In this paper, we examine the ethical aspects of using NIPT 'purely for information', including the competing interests of the prospective parents and the future child, and the acceptability of testing for 'frivolous' reasons. Drawing on several clinical scenarios, we claim that arguments about testing children for genetic conditions are relevant to this debate. In addition, we raise ethical concerns over the potential for objectification of the child. We conclude that, in most cases, using NIPT to test for adult-onset conditions, carrier status or non-serious traits presenting in childhood would be unacceptable. PMID:25521970

  3. Design, fabrication and acceptance testing of a zero gravity whole body shower

    NASA Technical Reports Server (NTRS)

    Schumacher, E. A.; Lenda, J. A.

    1974-01-01

    Recent research and development programs have established the ability of the zero gravity whole body shower to maintain a comfortable environment in which the crewman can safely cleanse and dry the body. The purpose of this program was to further advance the technology of whole body bathing and to demonstrate technological readiness including in-flight maintenance by component replacement for flight applications. Three task efforts of this program are discussed. Conceptual designs and system tradeoffs were accomplished in task 1. Task 2 involved the formulation of preliminary and final designs for the shower, while task 3 included the fabrication and test of the shower assembly. Particular attention is paid to the evaluation and correction of test anomalies during the final phase of the program.

  4. 2009 GED Testing Program Statistical Report

    ERIC Educational Resources Information Center

    GED Testing Service, 2010

    2010-01-01

    The "2009 GED[R] Testing Program Statistical Report" is the 52nd annual report in the program's 68-year history of providing a second opportunity for adults without a high school credential to earn their jurisdiction's GED credential. The report provides candidate demographic and GED Test performance statistics as well as historical information on…

  5. Community acceptability of use of rapid diagnostic tests for malaria by community health workers in Uganda

    PubMed Central

    2010-01-01

    Background Many malarious countries plan to introduce artemisinin combination therapy (ACT) at community level using community health workers (CHWs) for treatment of uncomplicated malaria. Use of ACT with reliance on presumptive diagnosis may lead to excessive use, increased costs and rise of drug resistance. Use of rapid diagnostic tests (RDTs) could address these challenges but only if the communities will accept their use by CHWs. This study assessed community acceptability of the use of RDTs by Ugandan CHWs, locally referred to as community medicine distributors (CMDs). Methods The study was conducted in Iganga district using 10 focus group discussions (FGDs) with CMDs and caregivers of children under five years, and 10 key informant interviews (KIIs) with health workers and community leaders. Pre-designed FGD and KII guides were used to collect data. Manifest content analysis was used to explore issues of trust and confidence in CMDs, stigma associated with drawing blood from children, community willingness for CMDs to use RDTs, and challenges anticipated to be faced by the CMDs. Results CMDs are trusted by their communities because of their commitment to voluntary service, access, and the perceived effectiveness of anti-malarial drugs they provide. Some community members expressed fear that the blood collected could be used for HIV testing, the procedure could infect children with HIV, and the blood samples could be used for witchcraft. Education level of CMDs is important in their acceptability by the community, who welcome the use of RDTs given that the CMDs are trained and supported. Anticipated challenges for CMDs included transport for patient follow-up and picking supplies, adults demanding to be tested, and caregivers insisting their children be treated instead of being referred. Conclusion Use of RDTs by CMDs is likely to be acceptable by community members given that CMDs are properly trained, and receive regular technical supervision and logistical

  6. EVALUATION OF ARG-1 SAMPLES PREPARED BY CESIUM CARBONATE DISSOLUTION DURING THE ISOLOK SME ACCEPTABILITY TESTING

    SciTech Connect

    Edwards, T.; Hera, K.; Coleman, C.

    2011-12-05

    Evaluation of Defense Waste Processing Facility (DWPF) Chemical Process Cell (CPC) cycle time identified several opportunities to improve the CPC processing time. The Mechanical Systems & Custom Equipment Development (MS&CED) Section of the Savannah River National Laboratory (SRNL) recently completed the evaluation of one of these opportunities - the possibility of using an Isolok sampling valve as an alternative to the Hydragard valve for taking DWPF process samples at the Slurry Mix Evaporator (SME). The use of an Isolok for SME sampling has the potential to improve operability, reduce maintenance time, and decrease CPC cycle time. The SME acceptability testing for the Isolok was requested in Task Technical Request (TTR) HLW-DWPF-TTR-2010-0036 and was conducted as outlined in Task Technical and Quality Assurance Plan (TTQAP) SRNLRP-2011-00145. RW-0333P QA requirements applied to the task, and the results from the investigation were documented in SRNL-STI-2011-00693. Measurement of the chemical composition of study samples was a critical component of the SME acceptability testing of the Isolok. A sampling and analytical plan supported the investigation with the analytical plan directing that the study samples be prepared by a cesium carbonate (Cs{sub 2}CO{sub 3}) fusion dissolution method and analyzed by Inductively Coupled Plasma - Optical Emission Spectroscopy (ICP-OES). The use of the cesium carbonate preparation method for the Isolok testing provided an opportunity for an additional assessment of this dissolution method, which is being investigated as a potential replacement for the two methods (i.e., sodium peroxide fusion and mixed acid dissolution) that have been used at the DWPF for the analysis of SME samples. Earlier testing of the Cs{sub 2}CO{sub 3} method yielded promising results which led to a TTR from Savannah River Remediation, LLC (SRR) to SRNL for additional support and an associated TTQAP to direct the SRNL efforts. A technical report resulting

  7. DOE standard: Filter test facility quality program plan

    SciTech Connect

    1999-02-01

    This standard was developed primarily for application in US Department of Energy programs. It contains specific direction for HEPA filter testing performed at a DOE-accepted HEPA Filter Test Facility (FTF). Beneficial comments (recommendations, additions, deletions) and any pertinent data that may improve this document should be sent to the Office of Nuclear Safety Policy and Standards (EH-31), US Department of Energy, Washington, DC 20585, by letter or by using the self-addressed Document Improvement Proposal form (DOE F 1300.3) appearing at the end of this document.

  8. High levels of acceptability of couples-based HIV testing among MSM in South Africa

    PubMed Central

    Stephenson, Rob; Rentsch, Christopher; Sullivan, Patrick

    2011-01-01

    The acceptability of couples-based voluntary HIV counseling and testing (CVCT) has not been previously investigated among MSM in South Africa. Using online advertisements, data were collected from 486 MSM, who were 18 years of age or older with a current residence in South Africa and had at least one male sex partner in the previous 12 months. The analysis examined associations between individual characteristics and willingness to utilize CVCT services. The willingness to utilize CVCT services was compellingly high (89%) among this sample of mostly White/European African (89%) and HIV-negative (83%) men. MSM who reported higher numbers of completed school years were less likely to report willingness to use CVCT. Willingness did not vary significantly across other individual demographic or behavioral characteristics. Our results show an overwhelmingly high acceptance of CVCT services. Future studies should survey a more heterogeneous population of MSM, explore the complex nature of same-sex male relationships, and why respondents would or would not use these HIV testing services. PMID:22007940

  9. The adaptive secondary mirror for the Large Binocular Telescope: results of acceptance laboratory test

    NASA Astrophysics Data System (ADS)

    Riccardi, A.; Xompero, M.; Zanotti, D.; Busoni, L.; Del Vecchio, C.; Salinari, P.; Ranfagni, P.; Brusa Zappellini, G.; Biasi, R.; Andrighettoni, M.; Gallieni, D.; Anaclerio, E.; Martin, H. M.; Miller, S. M.

    2008-07-01

    The first of the two Gregorian Adaptive Secondary Mirror (ASM) units for the Large Binocular Telescope (LBT) has been fully integrated and tested for laboratory acceptance. The LBT unit represents the most advanced ASM device existing in hardware. The unit has 672 electro-magnetic force actuators to change the shape of the 1.6mm-thick and 911mm-diameter Zerodur shell. The actuators control the mirror figure using the position feedback from the internal metrology provided by co-located capacitive sensors. The on-board real-time control electronics has a parallel computational power of 163Gflop/s providing not only the internal control of the unit with a 72kHz loop but also the wavefront reconstruction for the 1kHz Adaptive Optics loop. The paper describes the final configuration of the system and reports the results of the characterization and optimization process together with the results of the laboratory acceptance tests.

  10. The Careful Puppet Master: Reducing risk and fortifying acceptance testing with Jenkins CI

    NASA Astrophysics Data System (ADS)

    Smith, Jason A.; Richman, Gabriel; DeStefano, John; Pryor, James; Rao, Tejas; Strecker-Kellogg, William; Wong, Tony

    2015-12-01

    Centralized configuration management, including the use of automation tools such as Puppet, can greatly increase provisioning speed and efficiency when configuring new systems or making changes to existing systems, reduce duplication of work, and improve automated processes. However, centralized management also brings with it a level of inherent risk: a single change in just one file can quickly be pushed out to thousands of computers and, if that change is not properly and thoroughly tested and contains an error, could result in catastrophic damage to many services, potentially bringing an entire computer facility offline. Change management procedures can—and should—be formalized in order to prevent such accidents. However, like the configuration management process itself, if such procedures are not automated, they can be difficult to enforce strictly. Therefore, to reduce the risk of merging potentially harmful changes into our production Puppet environment, we have created an automated testing system, which includes the Jenkins CI tool, to manage our Puppet testing process. This system includes the proposed changes and runs Puppet on a pool of dozens of RedHat Enterprise Virtualization (RHEV) virtual machines (VMs) that replicate most of our important production services for the purpose of testing. This paper describes our automated test system and how it hooks into our production approval process for automatic acceptance testing. All pending changes that have been pushed to production must pass this validation process before they can be approved and merged into production.

  11. Testing programs for the Multimission Modular Spacecraft

    NASA Technical Reports Server (NTRS)

    Greenwell, T. J.

    1978-01-01

    The Multimission Modular Spacecraft (MMS) provides a standard spacecraft bus to a user for a variety of space missions ranging from near-earth to synchronous orbits. The present paper describes the philosophy behind the MMS module test program and discusses the implementation of the test program. It is concluded that the MMS module test program provides an effective and comprehensive customer buy-off at the subsystem contractor's plant, is an optimum approach for checkout of the subsystems prior to use for on-orbit servicing in the Shuttle Cargo Bay, and is a cost-effective technique for environmental testing.

  12. NEMO medium voltage converter factory acceptance, operational and final integration tests

    NASA Astrophysics Data System (ADS)

    Cocimano, Rosanna; NEMO Collaboration

    2011-01-01

    The NEMO Collaboration, as part of the KM3NeT EU-funded consortium, is developing technical solutions for the construction of a cubic-kilometer scale neutrino telescope in the Mediterranean sea several kilometers below the sea level and far from the shore. In this framework, after years of design, development, assembly and testing the Alcatel deep sea medium voltage power converter (MVC) is ready for deployment at 100 km from the Capo Passero shore station. The MVC converts the 10 kV to an instrument-friendly 375 V for a 10 kW power. The MVC will be presented with focus on the factory acceptance, operational and final integration tests that recently have been carried out.

  13. Tank Monitor and Control System sensor acceptance test procedure. Revision 5

    SciTech Connect

    Scaief, C.C. III

    1994-09-26

    The purpose of this acceptance test procedure (ATP) is to verify the correct reading of sensor elements connected to the Tank Monitor and Control System (TMACS). This ATP is intended to be used for testing of the connection of existing temperature sensors, new temperature sensors, pressure sensing equipment, new Engraf level gauges, sensors that generate a current output, and discrete (on/off) inputs. It is intended that this ATP will be used each time sensors are added to the system. As a result, the data sheets have been designed to be generic. The TMACS has been designed in response to recommendations from the Defense Nuclear Facilities Safety Board primarily for improved monitoring of waste tank temperatures. The system has been designed with the capability to monitor other types of sensor input as well.

  14. (Acceptance testing of the 150-kW electron-beam furnace)

    SciTech Connect

    Ohriner, E.K.; Howell, C.R.

    1990-09-18

    The travelers observed the acceptance testing of the 150-kW electron-beam (EB) furnace constructed by Leybold (Hanau) Technologies prior to disassembly and shipping. The testing included: (1) operation of the mold withdrawal system (2) vacuum pumping and vacuum chamber leak-up rates, (3) power stability at full power, (4) x-radiation monitoring at full power, and (5) demonstration of system interlocks for loss of water cooling, loss of vacuum, loss of power, and emergency shutdown. Preliminary training was obtained in furnace operation, EB gun maintenance, and use of the programmable logic controller for beam manipulation. Additional information was obtained on water-cooling requirements and furnace platform construction necessary for the installation. The information gained and training received will greatly assist in minimizing the installation and startup operation costs of the furnace.

  15. Space station structures and dynamics test program

    NASA Technical Reports Server (NTRS)

    Bugg, Frank M.; Ivey, E. W.; Moore, C. J.; Townsend, John S.

    1987-01-01

    The design, construction, and operation of a low-Earth orbit space station poses challenges for development and implementation of technology. One specific challenge is the development of a dynamics test program for defining the space station design requirements, and identifying and characterizing phenomena affecting the space station's design and development. The test proposal, as outlined, is a comprehensive structural dynamics program to be launched in support of the space station (SS). Development of a parametric data base and verification of the mathematical models and analytical analysis tools necessary for engineering support of the station's design, construction, and operation provide the impetus for the dynamics test program. The four test phases planned are discussed: testing of SS applicable structural concepts; testing of SS prototypes; testing of actual SS structural hardware; and on-orbit testing of SS construction.

  16. Acceptability testing of radioluminescent lights for VFR-night air taxi operations

    SciTech Connect

    Jensen, G.A.

    1985-01-01

    Tritium-powered radioluminescent (RL) lights have been under development for remote, austere, and tactical airfield lighting applications. The State of Alaska has requested FAA approval for use of the technology as a safe alternative lighting system to meet the airfield lighting needs of air taxi operations and general aviation in the state. The tests described in this report were performed by PNL for the DOE Defense Byproducts Production and Utilization Program. These tests are a step toward gaining the required approvals.

  17. Technical bases for the DWPF testing program

    SciTech Connect

    Plodinec, M.J.

    1990-09-17

    The Defense Waste Processing Facility (DWPF) at the Savannah River Site (SRS) will be the first production facility in the United States for the immobilization of high-level nuclear waste. Production of DWPF canistered wasteforms will begin prior to repository licensing, so decisions on facility startup will have to be made before the final decisions on repository design are made. The Department of Energy's Office of Civilian Radioactive Waste Management (RW) has addressed this discrepancy by defining a Waste Acceptance Process. This process provides assurance that the borosilicate-glass wasteform, in a stainless-steel canister, produced by the DWPF will be acceptable for permanent storage in a federal repository. As part of this process, detailed technical specifications have been developed for the DWPF product. SRS has developed detailed strategies for demonstrating compliance with each of the Waste Acceptance Process specifications. An important part of the compliance is the testing which will be carried out in the DWPF. In this paper, the bases for each of the tests to be performed in the DWPF to establish compliance with the specifications are described, and the tests are detailed. The results of initial tests relating to characterization of sealed canisters are reported.

  18. Technical bases for the DWPF testing program

    SciTech Connect

    Plodinec, M.J.

    1990-09-17

    The Defense Waste Processing Facility (DWPF) at the Savannah River Site (SRS) will be the first production facility in the United States for the immobilization of high-level nuclear waste. Production of DWPF canistered wasteforms will begin prior to repository licensing, so decisions on facility startup will have to be made before the final decisions on repository design are made. The Department of Energy`s Office of Civilian Radioactive Waste Management (RW) has addressed this discrepancy by defining a Waste Acceptance Process. This process provides assurance that the borosilicate-glass wasteform, in a stainless-steel canister, produced by the DWPF will be acceptable for permanent storage in a federal repository. As part of this process, detailed technical specifications have been developed for the DWPF product. SRS has developed detailed strategies for demonstrating compliance with each of the Waste Acceptance Process specifications. An important part of the compliance is the testing which will be carried out in the DWPF. In this paper, the bases for each of the tests to be performed in the DWPF to establish compliance with the specifications are described, and the tests are detailed. The results of initial tests relating to characterization of sealed canisters are reported.

  19. The Feasibility, Acceptability, and Preliminary Effectiveness of a Promotora-Led Diabetes Prevention Program (PL-DPP) in Latinas

    PubMed Central

    O’Brien, Matthew J.; Perez, Alberly; Alos, Victor A.; Whitaker, Robert C.; Ciolino, Jody D.; Mohr, David C.; Ackermann, Ronald T.

    2015-01-01

    Purpose The purpose of this pilot study is to test the feasibility, acceptability, and preliminary effectiveness of a Promotora-Led Diabetes Prevention Program (PL-DPP) in Hispanic women (Latinas). Methods Twenty Latina adults with prediabetes were enrolled in this single-arm pilot trial of PL-DPP. Participants underwent a year-long lifestyle intervention consisting of 24 sessions divided into 14 weekly core sessions and 10 post-core sessions offered either biweekly or monthly. Each session was led by a promotora in Spanish. The primary outcome was weight change over the 12-month study period. Results The study participants were socioeconomically challenged, middle-aged Latinas with limited access to health care. Eighteen participants (90%) completed at least 12 sessions, and 1 was lost to follow-up. Overall, participants reported high levels of satisfaction with PL-DPP. At 12 months, the participants achieved a mean weight loss of 10.8 pounds, which corresponded to 5.6% of initial body weight. Significant pre-post reductions in waist circumference, diastolic blood pressure, LDL cholesterol, and insulin levels were also observed. Modest reductions in A1C and fasting plasma glucose were not significant. Conclusions The PL-DPP demonstrated feasibility, acceptability, and preliminary effectiveness in a high-risk population of Latinas. Future research examining this intervention in a randomized clinical trial should explore factors impacting its effects using both qualitative and quantitative methods. PMID:26023095

  20. Simple structures test for elastic-plastic strain acceptance criterion validation

    SciTech Connect

    Trimble, T.F.; Krech, G.R.

    1997-11-01

    A Simple Structures Test Program was performed where several cantilevered beam and fixed-end beam test specimens (fabricated from HY-80 steel) were subjected to a series of analytically predetermined rapidly applied transient dynamic input loads. The primary objective of the test program was to obtain dynamic nonlinear response for simple structures subjected to these load inputs. Data derived from these tests was subsequently used to correlate to analysis predictions to assess the capability to analytically predict elastic-plastic nonlinear material behavior in structures using typical time-dependent (transient) design methods and the ABAQUS finite element analysis code. The installation of a significant amount of instrumentation on these specimens and post-test measurements enabled the monitoring and recording of strain levels, displacements, accelerations, and permanent set. An assessment of modeling parameters such as the element type and mesh refinement was made using these test results. In addition, currently available material models and the incremental time step procedure used in the transient analyses were evaluated. Comparison of test data to analysis results shows that displacements, accelerations, and peak strain can be predicted with a reasonable level of accuracy using detailed solid models of the tested specimens. Permanent set is overpredicted by a factor of approximately two. However, the accuracy of the prediction of permanent set is being enhanced by updating material modeling in the ABAQUS code to account for effects of strain reversal in oscillatory behavior of dynamically loaded specimens.

  1. Acceptance of New Technology: A Usability Test of a Computerized Adaptive Test for Fatigue in Rheumatoid Arthritis

    PubMed Central

    Nikolaus, Stephanie; Taal, Erik; Vonkeman, Harald E; Glas, Cees AW; van de Laar, Mart AFJ

    2014-01-01

    Background Little is known about the acceptance and usability of computerized adaptive tests (CATs) among patients with rheumatoid arthritis (RA). The main difference between completing a CAT and a traditional questionnaire concerns item presentation. CATs only provide one item at a time on the screen, and skipping forward or backward to review and change already given answers is often not possible. Objective The objective of this study was to examine how patients with RA experience a Web-based CAT for fatigue. Methods In individual sessions, participants filled in the CAT while thinking aloud, and were subsequently interviewed about their experience with the new instrument. The technology acceptance model (TAM) was used to structure the results. Results The participants were 15 patients with RA. They perceived the CAT as clear, brief, and easy to use. They were positive about answering one question per screen, the changing response options, layout, progress bar, and item number. There were 40% (6/15) of the participants that also mentioned that they experienced the completion of the CAT as useful and pleasant, and liked the adaptive test mechanism. However, some participants noted that not all items were applicable to everybody, and that the wordings of questions within the severity dimension were often similar. Conclusions Participants perceived the “CAT Fatigue RA” as easy to use, and also its usefulness was expressed. A 2.0 version has been improved according to the participants’ comments, and is currently being used in a validation study before it will be implemented in daily clinical practice. Our results give a first indication that CAT methodology may outperform traditional questionnaires not merely on measurement precision, but also on usability and acceptance valuation. PMID:27025404

  2. Electrical Arc Ignition Testing for Constellation Program

    NASA Technical Reports Server (NTRS)

    Sparks, Kyle; Gallus, Timothy; Smith, Sarah

    2009-01-01

    NASA Johnson Space Center (JSC) Materials and Processes Branch requested that NASA JSC White Sands Test Facility (WSTF) perform testing for the Constellation Program to evaluate the hazard of electrical arc ignition of materials that could be in close proximity to batteries. Specifically, WSTF was requested to perform wire-break electrical arc tests to determine the current threshold for ignition of generic cotton woven fabric samples with a fixed voltage of 3.7 V, a common voltage for hand-held electrical devices. The wire-break test was developed during a previous test program to evaluate the hazard of electrical arc ignition inside the Extravehicular Mobility Unit [1].

  3. Propulsion Induced Effects Test Program

    NASA Technical Reports Server (NTRS)

    Cappuccio, Gelsomina; Won, Mark; Bencze, Dan

    1999-01-01

    The objective of this milestone is to assess the propulsion/airframe integration characteristics of the Technology Concept Airplane and design variations through computational analysis and experimental subsonic through supersonic wind tunnel testing. The Milestone will generate a comprehensive CFD and wind tunnel data base of the baseline, and design variations. Emphasis will be placed on establishing the propulsion induced effects on the flight performance of the Technology Concept Airplane with all appropriate wind tunnel corrections.

  4. SU-E-P-46: Clinical Acceptance Testing and Implementation of a Portable CT Unit

    SciTech Connect

    LaFrance, M; Marsh, S; Hicks, R; O’Donnell-Moran, G

    2015-06-15

    Purpose: Planning for the first installation in New England of a new portable CT unit to be used in the Operating Room required the integration of many departments including Surgery, Neurosurgery, Information Services, Clinical Engineering, Radiology and Medical Physics/Radiation Safety. Acceptance testing and the quality assurance procedures were designed to optimize image quality and patient and personnel radiation exposure. Methods: The vendor’s protocols were tested using the CT Dosimetry phantoms. The system displayed the CTDIw instead of the CTDIvol while testing the unit. Radiation exposure was compared to existing CT scanners from installed CT units throughout the facility. Brainlab measures all 4 periphery slots on the CT Dosimetry phantom. The ACR measures only the superior slot for the periphery measurement. A comprehensive radiation survey was also performed for several locations. Results: The CTDIvol measurements were comparable for the following studies: brain, C-Spine, and sinuses. However, the mobile CT measurements were slightly higher than other CT units but within acceptable tolerance if measured using the ACR method.Based on scatter measurements, it was determined if any personnel were to stay in the OR Suite during image acquisition that the appropriate lead apron and thyroid shields had to be worn.In addition, to reduce unnecessary scatter, there were two mobile 6 foot wide shields (1/16″ lead equivalent) available to protect personnel in the room and adjacent areas. Conclusion: Intraoperative CT provides the physician new opportunities for evaluation of the progression of surgical resections and device placement at the cost of increasing the amount of trained personnel required to perform this procedure. It also brings with it challenges to keep the radiation exposure to the patients and staff within reasonable limits.

  5. KSC 50-MHz Doppler Radar Wind Profiler (DRWP) Operational Acceptance Test (OAT) Report

    NASA Technical Reports Server (NTRS)

    Barbre, Robert E.

    2015-01-01

    This report documents analysis results of the Kennedy Space Center updated 50-MHz Doppler Radar Wind Profiler (DRWP) Operational Acceptance Test (OAT). This test was designed to demonstrate that the new DRWP operates in a similar manner to the previous DRWP for use as a situational awareness asset for mission operations at the Eastern Range to identify rapid changes in the wind environment that weather balloons cannot depict. Data examination and two analyses showed that the updated DRWP meets the specifications in the OAT test plan and performs at least as well as the previous DRWP. Data examination verified that the DRWP provides complete profiles every five minutes from 1.8-19.5 km in vertical increments of 150 m. Analysis of 5,426 wind component reports from 49 concurrent DRWP and balloon profiles presented root mean square (RMS) wind component differences around 2.0 m/s. The DRWP's effective vertical resolution (EVR) was found to be 300 m for both the westerly and southerly wind component, which the best EVR possible given the DRWP's vertical sampling interval. A third analysis quantified the sensitivity to rejecting data that do not have adequate signal by assessing the number of first-guess propagations at each altitude. This report documents the data, quality control procedures, methodology, and results of each analysis. It also shows that analysis of the updated DRWP produced results that were at least as good as the previous DRWP with proper rationale. The report recommends acceptance of the updated DRWP for situational awareness usage as per the OAT's intent.

  6. In-situ thermal testing program strategy

    SciTech Connect

    1995-06-01

    In the past year the Yucca Mountain Site Characterization Project has implemented a new Program Approach to the licensing process. The Program Approach suggests a step-wise approach to licensing in which the early phases will require less site information than previously planned and necessitate a lesser degree of confidence in the longer-term performance of the repository. Under the Program Approach, the thermal test program is divided into two principal phases: (1) short-term in situ tests (in the 1996 to 2000 time period) and laboratory thermal tests to obtain preclosure information, parameters, and data along with bounding information for postclosure performance; and (2) longer-term in situ tests to obtain additional data regarding postclosure performance. This effort necessitates a rethinking of the testing program because the amount of information needed for the initial licensing phase is less than previously planned. This document proposes a revised and consolidated in situ thermal test program (including supporting laboratory tests) that is structured to meet the needs of the Program Approach. A customer-supplier model is used to define the Project data needs. These data needs, along with other requirements, were then used to define a set of conceptual experiments that will provide the required data within the constraints of the Program Approach schedule. The conceptual thermal tests presented in this document represent a consolidation and update of previously defined tests that should result in a more efficient use of Project resources. This document focuses on defining the requirements and tests needed to satisfy the goal of a successful license application in 2001, should the site be found suitable.

  7. 241-AZ-101 Mixer Pump Demonstration Test Gamma Cart Acceptance Test Procedure and Quality Test Plan (ATP and QTP)

    SciTech Connect

    WHITE, D.A.

    2000-03-01

    Shop Test of the Gamma Cart System to be used in the AZ-101 Mixer Pump Demonstration Test. Tests hardware and software. This procedure involves testing the Instrumentation involved with the Gamma Cart System, local and remote, including: depth indicators, speed controls, interface to data acquisition software and the raising and lowering functions. This Procedure will be performed twice, once for each Gamma Cart System. This procedure does not test the accuracy of the data acquisition software.

  8. Results of the Updated NASA Kennedy Space Center 50-MHz Doppler Radar Wind Profiler Operational Acceptance Test

    NASA Technical Reports Server (NTRS)

    Barbre', Robert E., Jr.; Deker, Ryan K.; Leahy, Frank B.; Huddleston, Lisa

    2016-01-01

    We present here the methodology and results of the Operational Acceptance Test (OAT) performed on the new Kennedy Space Center (KSC) 50-MHz Doppler Radar Wind Profiler (DRWP). On day-of-launch (DOL), space launch vehicle operators have used data from the DRWP to invalidate winds in prelaunch loads and trajectory assessments due to the DRWP's capability to quickly identify changes in the wind profile within a rapidly-changing wind environment. The previous DRWP has been replaced with a completely new system, which needs to undergo certification testing before being accepted for use in range operations. The new DRWP replaces the previous three-beam system made of coaxial cables and a copper wire ground plane with a four-beam system that uses Yagi antennae with enhanced beam steering capability. In addition, the new system contains updated user interface software while maintaining the same general capability as the previous system. The new DRWP continues to use the Median Filter First Guess (MFFG) algorithm to generate a wind profile from Doppler spectra at each range gate. DeTect (2015) contains further details on the upgrade. The OAT is a short-term test designed so that end users can utilize the new DRWP in a similar manner to the previous DRWP during mission operations at the Eastern Range in the midst of a long-term certification process. This paper describes the Marshall Space Flight Center Natural Environments Branch's (MSFC NE's) analyses to verify the quality and accuracy of the DRWP's meteorological data output as compared to the previous DRWP. Ultimately, each launch vehicle program has the responsibility to certify the system for their own use.

  9. Canister disposition plan for the DWPF Startup Test Program

    SciTech Connect

    Harbour, J.R.; Payne, C.H.

    1990-01-01

    This report details the disposition of canisters and the canistered waste forms produced during the DWPF Startup Test Program. The six melter campaigns (DWPF Startup Tests FA-13, WP-14, WP-15, WP-16, WP-17, and FA-18) will produce 126 canistered waste forms. In addition, up to 20 additional canistered waste forms may be produced from glass poured during the transition between campaigns. In particular, this canister disposition plan (1) assigns (by alpha-numeric code) a specific canister to each location in the six campaign sequences, (2) describes the method of access for glass sampling on each canistered waste form, (3) describes the nature of the specific tests which will be carried out, (4) details which tests will be carried out on each canistered waste form, (5) provides the sequence of these tests for each canistered waste form, and (6) assigns a storage location for each canistered waste form. The tests are designed to provide evidence, as detailed in the Waste Form Compliance Plan (WCP[sup 1]), that the DWPF product will comply with the Waste Acceptance Product Specifications (WAPS[sup 2]). The WAPS must be met before the canistered waste form is accepted by DOE for ultimate disposal at the Federal Repository. The results of these tests will be included in the Waste Form Qualification Report (WQR).

  10. Department of Defense picture archiving and communication system acceptance testing: results and identification of problem components.

    PubMed

    Allison, Scott A; Sweet, Clifford F; Beall, Douglas P; Lewis, Thomas E; Monroe, Thomas

    2005-09-01

    The PACS implementation process is complicated requiring a tremendous amount of time, resources, and planning. The Department of Defense (DOD) has significant experience in developing and refining PACS acceptance testing (AT) protocols that assure contract compliance, clinical safety, and functionality. The DOD's AT experience under the initial Medical Diagnostic Imaging Support System contract led to the current Digital Imaging Network-Picture Archiving and Communications Systems (DIN-PACS) contract AT protocol. To identify the most common system and component deficiencies under the current DIN-PACS AT protocol, 14 tri-service sites were evaluated during 1998-2000. Sixteen system deficiency citations with 154 separate types of limitations were noted with problems involving the workstation, interfaces, and the Radiology Information System comprising more than 50% of the citations. Larger PACS deployments were associated with a higher number of deficiencies. The most commonly cited systems deficiencies were among the most expensive components of the PACS. PMID:15924273

  11. Source test of the prototype neutron detector for the large-acceptance multipurpose spectrometer at RAON

    NASA Astrophysics Data System (ADS)

    Lee, Kisoo; Lee, Kyong Sei; Mulilo, Benard; Hong, Byungsik

    2013-05-01

    A neutron detector array will be essential for the study of the nuclear symmetry energy in the large-acceptance multipurpose spectrometer (LAMPS) at the planned rare-isotope beam facility RAON in Korea. We have built the prototype neutron detector for LAMPS and examined its performance by using radiation sources. For data taking, we tested the voltage-threshold discriminator (VTD) and the constant-fraction discriminator (CFD) modules for the pulse process. The intrinsic time resolution of the prototype detector is estimated to be 723 ps for VTD and 488 ps for CFD. The fission neutrons and gammas emitted from 252Cf can be clearly separated in the time distribution. We reconstruct the energy spectrum of the spontaneous fission neutrons from 252Cf, which can be described well by using the empirical Watt spectrum.

  12. Automated testing data reduction computer program

    NASA Technical Reports Server (NTRS)

    Chamis, C. C.; Kring, J.; Sullivan, T. L.

    1972-01-01

    The capability of a computer program which can be part of a larger computer program for a fully automated multiaxial testing facility is described. The program was designed to process test data from tubular or flat specimens made from isotropic or anistropic materials, including high modulus fiber composites. Data from a large number of strain gages and combinations of applied loads can be used. Options are provided for single element, 90-degree, rectangular or Delta rosettes, or any combinations of these types of strain gages. Options are provided for strain gage transverse sensitivities. The program outputs include: structural axes strains and stresses, initial and strain-dependent elastic constants, shift of principal strain direction with load, and local curvatures from back-to-back strain gages, and either Calcomp or microfilm plots. The computer program is described with respect to its flow chart, input/output, embedding or linking with other programs.

  13. MIUS integration and subsystems test program

    NASA Technical Reports Server (NTRS)

    Beckham, W. S., Jr.; Shows, G. C.; Redding, T. E.; Wadle, R. C.; Keough, M. B.; Poradek, J. C.

    1976-01-01

    The MIUS Integration and Subsystems Test (MIST) facility at the Lyndon B. Johnson Space Center was completed and ready in May 1974 for conducting specific tests in direct support of the Modular Integrated Utility System (MIUS). A series of subsystems and integrated tests was conducted since that time, culminating in a series of 24-hour dynamic tests to further demonstrate the capabilities of the MIUS Program concepts to meet typical utility load profiles for a residential area. Results of the MIST Program are presented which achieved demonstrated plant thermal efficiencies ranging from 57 to 65 percent.

  14. Space station structures and dynamics test program

    NASA Technical Reports Server (NTRS)

    Moore, Carleton J.; Townsend, John S.; Ivey, Edward W.

    1987-01-01

    The design, construction, and operation of a low-Earth orbit space station poses unique challenges for development and implementation of new technology. The technology arises from the special requirement that the station be built and constructed to function in a weightless environment, where static loads are minimal and secondary to system dynamics and control problems. One specific challenge confronting NASA is the development of a dynamics test program for: (1) defining space station design requirements, and (2) identifying the characterizing phenomena affecting the station's design and development. A general definition of the space station dynamic test program, as proposed by MSFC, forms the subject of this report. The test proposal is a comprehensive structural dynamics program to be launched in support of the space station. The test program will help to define the key issues and/or problems inherent to large space structure analysis, design, and testing. Development of a parametric data base and verification of the math models and analytical analysis tools necessary for engineering support of the station's design, construction, and operation provide the impetus for the dynamics test program. The philosophy is to integrate dynamics into the design phase through extensive ground testing and analytical ground simulations of generic systems, prototype elements, and subassemblies. On-orbit testing of the station will also be used to define its capability.

  15. Program Helps Design Tests Of Developmental Software

    NASA Technical Reports Server (NTRS)

    Hops, Jonathan

    1994-01-01

    Computer program called "A Formal Test Representation Language and Tool for Functional Test Designs" (TRL) provides automatic software tool and formal language used to implement category-partition method and produce specification of test cases in testing phase of development of software. Category-partition method useful in defining input, outputs, and purpose of test-design phase of development and combines benefits of choosing normal cases having error-exposing properties. Traceability maintained quite easily by creating test design for each objective in test plan. Effort to transform test cases into procedures simplified by use of automatic software tool to create cases based on test design. Method enables rapid elimination of undesired test cases from consideration and facilitates review of test designs by peer groups. Written in C language.

  16. System-Wide Tests of Occupational Programs.

    ERIC Educational Resources Information Center

    Perlmutter, Deborah E.

    This report presents the background methodology, findings, and recommendations of three studies that comprised System-Wide Tests of Occupational Programs, a 4-year research program to assess the impact of vocational education using various followup techniques. Part 1 focuses on Project CATCH (Career Training Choice), a followup study of students…

  17. Balloon launched decelerator test program: Post-test test report

    NASA Technical Reports Server (NTRS)

    Dickinson, D.; Schlemmer, J.; Hicks, F.; Michel, F.; Moog, R. D.

    1972-01-01

    Balloon Launched Decelerator Test (BLDT) flights were conducted during the summer of 1972 over the White Sands Missile Range. The purpose of these tests was to qualify the Viking disk-gap band parachute system behind a full-scale simulator of the Viking Entry Vehicle over the maximum range of entry conditions anticipated in the Viking '75 soft landing on Mars. Test concerns centered on the ability of a minimum weight parachute system to operate without structural damage in the turbulent wake of the blunt-body entry vehicle (140 deg, 11.5 diameter cone). This is the first known instance of parachute operation at supersonic speeds in the wake of such a large blunt body. The flight tests utilized the largest successful balloon-payload weight combination known to get to high altitude (120kft) where rocket engines were employed to boost the test vehicle to supersonic speeds and dynamic pressures simulating the range of conditions on Mars.

  18. Acceptability and feasibility of HIV self-testing among men who have sex with men in Peru and Brazil.

    PubMed

    Volk, Jonathan E; Lippman, Sheri A; Grinsztejn, Beatriz; Lama, Javier R; Fernandes, Nilo M; Gonzales, Pedro; Hessol, Nancy A; Buchbinder, Susan

    2016-06-01

    HIV self-testing has the potential to increase testing frequency and uptake. This pilot study assessed the feasibility and acceptability of HIV self-testing in a sample of sexually active men who have sex with men (MSM) in Peru and Brazil. Participants were trained to use a whole blood rapid HIV self-test and instructed to use the self-test monthly during this three-month study. Test acceptability was measured with self-reported use of the test at the one-month and three-month study visits, and test feasibility was assessed by direct observation of self-test administration at the final three-month visit. A total of 103 participants (52 in Peru and 51 in Brazil) were enrolled, and 86% completed the three-month study. Nearly all participants reported use of the self-test (97% at one-month and 98% at three-month visit), and all participants correctly interpreted the self-administered test results when observed using the test at the final study visit. HIV self-testing with a blood-based assay was highly acceptable and feasible. HIV self-testing may have the potential to increase testing frequency and to reach high-risk MSM not currently accessing HIV-testing services. PMID:25971262

  19. Air Force use of civil airworthiness criteria for testing and acceptance of military derivative transport aircraft

    SciTech Connect

    Marx, R.I.; Chapman, D.M.; Langley, M.J.; Fouts, R.S.

    1990-01-01

    A review of commercial aircraft programs and the use of FAA certification criteria in the acquisition of off-the-shelf transport aircraft by the USAF to fulfill its airlift requirements is presented. In addition, major differences between military and commercial test programs and acquisition are cited to illustrate the principal benefits to the Air Force of this method. Significantly reduced acquisition time, and reduced ground and flight testing and development costs are shown as benefits of this process. The unique aspects of certification of military derivatives, recent initiatives to codify the processes, and the impacts on changes required in the manner in which the USAF currently contracts for aircraft are discussed. 20 refs.

  20. Independent review of Oak Ridge HCTW test program and development of seismic evaluation criteria

    SciTech Connect

    1995-05-01

    Many of the existing buildings at the Oak Ridge Y-12 Plant are steel frame construction with unreinforced hollow clay tile infill walls (HCTW). The HCTW infill provides some lateral seismic resistance to the design/evaluation basis earthquake; however acceptance criteria for this construction must be developed. The basis for the development of seismic criteria is the Oak Ridge HCTW testing and analysis program and the target performance goals of DOE 5480.28 and DOE-STD-1020-94. This report documents and independent review of the testing and analysis program and development of recommended acceptance criteria for Oak Ridge HCTW construction. The HCTW test program included ``macro`` wall in-plane and out-of-plane tests, full-scale wall in-plane and out-of-plane tests, in-situ out-of-plane test, shake table tests, and masonry component tests.

  1. Wireless Fetal Heart Rate Monitoring in Inpatient Full-Term Pregnant Women: Testing Functionality and Acceptability

    PubMed Central

    Boatin, Adeline A.; Wylie, Blair; Goldfarb, Ilona; Azevedo, Robin; Pittel, Elena; Ng, Courtney; Haberer, Jessica

    2015-01-01

    We tested functionality and acceptability of a wireless fetal monitoring prototype technology in pregnant women in an inpatient labor unit in the United States. Women with full-term singleton pregnancies and no evidence of active labor were asked to wear the prototype technology for 30 minutes. We assessed functionality by evaluating the ability to successfully monitor the fetal heartbeat for 30 minutes, transmit this data to Cloud storage and view the data on a web portal. Three obstetricians also rated fetal cardiotocographs on ease of readability. We assessed acceptability by administering closed and open-ended questions on perceived utility and likeability to pregnant women and clinicians interacting with the prototype technology. Thirty-two women were enrolled, 28 of whom (87.5%) successfully completed 30 minutes of fetal monitoring including transmission of cardiotocographs to the web portal. Four sessions though completed, were not successfully uploaded to the Cloud storage. Six non-study clinicians interacted with the prototype technology. The primary technical problem observed was a delay in data transmission between the prototype and the web portal, which ranged from 2 to 209 minutes. Delays were ascribed to Wi-Fi connectivity problems. Recorded cardiotocographs received a mean score of 4.2/5 (± 1.0) on ease of readability with an interclass correlation of 0.81(95%CI 0.45, 0.96). Both pregnant women and clinicians found the prototype technology likable (81.3% and 66.7% respectively), useful (96.9% and 66.7% respectively), and would either use it again or recommend its use to another pregnant woman (77.4% and 66.7% respectively). In this pilot study we found that this wireless fetal monitoring prototype technology has potential for use in a United States inpatient setting but would benefit from some technology changes. We found it to be acceptable to both pregnant women and clinicians. Further research is needed to assess feasibility of using this

  2. Wireless fetal heart rate monitoring in inpatient full-term pregnant women: testing functionality and acceptability.

    PubMed

    Boatin, Adeline A; Wylie, Blair; Goldfarb, Ilona; Azevedo, Robin; Pittel, Elena; Ng, Courtney; Haberer, Jessica

    2015-01-01

    We tested functionality and acceptability of a wireless fetal monitoring prototype technology in pregnant women in an inpatient labor unit in the United States. Women with full-term singleton pregnancies and no evidence of active labor were asked to wear the prototype technology for 30 minutes. We assessed functionality by evaluating the ability to successfully monitor the fetal heartbeat for 30 minutes, transmit this data to Cloud storage and view the data on a web portal. Three obstetricians also rated fetal cardiotocographs on ease of readability. We assessed acceptability by administering closed and open-ended questions on perceived utility and likeability to pregnant women and clinicians interacting with the prototype technology. Thirty-two women were enrolled, 28 of whom (87.5%) successfully completed 30 minutes of fetal monitoring including transmission of cardiotocographs to the web portal. Four sessions though completed, were not successfully uploaded to the Cloud storage. Six non-study clinicians interacted with the prototype technology. The primary technical problem observed was a delay in data transmission between the prototype and the web portal, which ranged from 2 to 209 minutes. Delays were ascribed to Wi-Fi connectivity problems. Recorded cardiotocographs received a mean score of 4.2/5 (± 1.0) on ease of readability with an interclass correlation of 0.81(95%CI 0.45, 0.96). Both pregnant women and clinicians found the prototype technology likable (81.3% and 66.7% respectively), useful (96.9% and 66.7% respectively), and would either use it again or recommend its use to another pregnant woman (77.4% and 66.7% respectively). In this pilot study we found that this wireless fetal monitoring prototype technology has potential for use in a United States inpatient setting but would benefit from some technology changes. We found it to be acceptable to both pregnant women and clinicians. Further research is needed to assess feasibility of using this

  3. Cervical Cancer Screening Program by Visual Inspection: Acceptability and Feasibility in Health Insurance Companies

    PubMed Central

    Horo, Apollinaire G.; Didi-Kouko Coulibaly, Judith; Koffi, Abdoul; Tchounga, Boris; Seni, Konan; Aka, Kacou Edèle; Kone, Mamourou

    2015-01-01

    Objective. To assess willingness to participate and diagnostic accuracy of visual inspection for early detection of cervical neoplasia among women in a health insurance company. Patients and Method. Cervical cancer screening was systematically proposed to 800 women after consecutive information and awareness sessions. The screening method was visual inspection with acetic acid (VIA) or Lugol's iodine (VILI). Results. Among the 800 identified women, 640 (82%) have accepted the screening, their mean age was 39 years, and 12.0% of them were involved in a polygamist couple. 28.2% of women had prior cervical screening. VIA has been detected positive in 5.9% of women versus 8.6% for VILI. The sensitivity was 72.9% and specificity was 95.2% for VIA versus 71.2% and 97.3% for VILI respectively. The histological examination highlighted a nonspecific chronic cervicitis in 4.6%, CIN1 lesions in 5.91%, and CIN2/3 in 1.2% of the cases. Conclusion. Cervical cancer screening by visual inspection showed appropriate diagnostic accuracy when used to detect early cervical lesions. It is a simple and easy to perform method that could be introduced progressively in the health insurance policy while waiting for a national screening program. PMID:26167178

  4. Acceptability of rapid oral fluid HIV testing among male injection drug users in Taiwan, 1997 and 2007.

    PubMed

    Lyu, Shu-Yu; Morisky, Donald E; Yeh, Ching-Ying; Twu, Shiing-Jer; Peng, Eugene Yu-Chang; Malow, Robert M

    2011-04-01

    Rapid oral fluid HIV testing (rapid oral testing) is in the process of being adapted in Taiwan and elsewhere given its advantages over prior HIV testing methods. To guide this process, we examined the acceptability of rapid oral testing at two time points (i.e., 1997 and 2007) among one of the highest risk populations, male injection drug users (IDUs). For this purpose, an anonymous self-administered survey was completed by HIV-negative IDUs involved in the criminal justice system in 1997 (N (1)=137 parolees) and 2007 (N (2)=106 prisoners). A social marketing model helped guide the design of our questionnaire to assess the acceptability of rapid oral testing. This included assessing a new product, across four marketing dimensions: product, price, promotion, and place. Results revealed that in both 1997 and 2007, over 90% indicated that rapid oral testing would be highly acceptable, particularly if the cost was under US$6, and that a pharmacy would be the most appropriate and accessible venue for selling the rapid oral testing kits. The vast majority of survey respondents believed that the cost of rapid oral testing should be federally subsidized and that television and newspaper advertisements would be the most effective media to advertise for rapid oral testing. Both the 1997 and 2007 surveys suggested that rapid oral HIV testing would be particularly accepted in Taiwan by IDUs after release from the criminal justice system. PMID:21271392

  5. Stennis personnel participate in test program

    NASA Technical Reports Server (NTRS)

    2008-01-01

    Fernando Figueroa (left), an aerospace technologist at Stennis, and John Schmatzel (center), a professor on loan from Rowan University in Glassboro, N.J., joined Ray Wang, president of Mobitrum Corp., in Silver Springs, Md., to test a virtual sensor instrument in development. The test was performed as part of NASA's Facilitated Access to the Space Environment for Technology Development and Training program.

  6. Program for Area Concentration Achievement Testing.

    ERIC Educational Resources Information Center

    Golden, Anthony J.

    The Program for Area Concentration Achievement Testing (PACAT) produces the cooperative assessment instrument known as the Area Concentration Achievement Test (ACAT). The ACAT uses a model designed specifically to measure curricular strengths and weaknesses and to provide this information at the departmental level. PACAT has developed 57…

  7. Credibility Issues Related to Testing Programs.

    ERIC Educational Resources Information Center

    Fleming, Margaret

    The implementation of a district-wide testing program requires careful consideration of credibility issues. These issues have been frequently overlooked or treated casually by test developers and users alike. It is well enough to study the reliability and validity issues involved when selecting instrumentation. It is also necessary to identify…

  8. The Ohio Vocational Education Achievement Test Program.

    ERIC Educational Resources Information Center

    Ohio State Univ., Columbus. Trade and Industrial Education Instructional Materials Lab.

    The Ohio Vocational Achievement Tests are specially designed instruments for use by teachers, supervisors, and administrators to evaluate and diagnose vocational achievement for improving instruction in secondary vocational programs at the 11th and 12th grade levels. This guide explains the Ohio Vocational Achievement Tests and how they are used.…

  9. Scaling of Lift Degradation Due to Anti-Icing Fluids Based Upon the Aerodynamic Acceptance Test

    NASA Technical Reports Server (NTRS)

    Broeren, Andy; Riley, Jim

    2012-01-01

    In recent years, the FAA has worked with Transport Canada, National Research Council Canada (NRC) and APS Aviation, Inc. to develop allowance times for aircraft operations in ice-pellet precipitation. These allowance times are critical to ensure safety and efficient operation of commercial and cargo flights. Wind-tunnel testing with uncontaminated anti-icing fluids and fluids contaminated with simulated ice pellets had been carried out at the NRC Propulsion and Icing Wind Tunnel (PIWT) to better understand the flow-off characteristics and resulting aerodynamic effects. The percent lift loss on the thin, high-performance wing model tested in the PIWT was determined at 8 deg. angle of attack and used as one of the evaluation criteria in determining the allowance times. Because it was unclear as to how performance degradations measured on this model were relevant to an actual airplane configuration, some means of interpreting the wing model lift loss was deemed necessary. This paper describes how the lift loss was related to the loss in maximum lift of a Boeing 737-200ADV airplane through the Aerodynamic Acceptance Test (AAT) performed for fluids qualification. A loss in maximum lift coefficient of 5.24% on the B737-200ADV airplane (which was adopted as the threshold in the AAT) corresponds to a lift loss of 7.3% on the PIWT model at 8 deg. angle of attack. There is significant scatter in the data used to develop the correlation related to varying effects of the anti-icing fluids that were tested and other factors. A statistical analysis indicated the upper limit of lift loss on the PIWT model was 9.2%. Therefore, for cases resulting in PIWT model lift loss from 7.3% to 9.2%, extra scrutiny of the visual observations is required in evaluating fluid performance with contamination.

  10. Scaling of Lift Degradation Due to Anti-Icing Fluids Based Upon the Aerodynamic Acceptance Test

    NASA Technical Reports Server (NTRS)

    Broeren, Andy P.; Riley, James T.

    2012-01-01

    In recent years, the FAA has worked with Transport Canada, National Research Council Canada (NRC) and APS Aviation, Inc. to develop allowance times for aircraft operations in ice-pellet precipitation. These allowance times are critical to ensure safety and efficient operation of commercial and cargo flights. Wind-tunnel testing with uncontaminated anti-icing fluids and fluids contaminated with simulated ice pellets had been carried out at the NRC Propulsion and Icing Wind Tunnel (PIWT) to better understand the flowoff characteristics and resulting aerodynamic effects. The percent lift loss on the thin, high-performance wing model tested in the PIWT was determined at 8 angle of attack and used as one of the evaluation criteria in determining the allowance times. Because it was unclear as to how performance degradations measured on this model were relevant to an actual airplane configuration, some means of interpreting the wing model lift loss was deemed necessary. This paper describes how the lift loss was related to the loss in maximum lift of a Boeing 737-200ADV airplane through the Aerodynamic Acceptance Test (AAT) performed for fluids qualification. A loss in maximum lift coefficient of 5.24 percent on the B737-200ADV airplane (which was adopted as the threshold in the AAT) corresponds to a lift loss of 7.3 percent on the PIWT model at 8 angle of attack. There is significant scatter in the data used to develop the correlation related to varying effects of the anti-icing fluids that were tested and other factors. A statistical analysis indicated the upper limit of lift loss on the PIWT model was 9.2 percent. Therefore, for cases resulting in PIWT model lift loss from 7.3 to 9.2 percent, extra scrutiny of the visual observations is required in evaluating fluid performance with contamination.

  11. Integrated Structural Analysis and Test Program

    NASA Technical Reports Server (NTRS)

    Kaufman, Daniel

    2005-01-01

    An integrated structural-analysis and structure-testing computer program is being developed in order to: Automate repetitive processes in testing and analysis; Accelerate pre-test analysis; Accelerate reporting of tests; Facilitate planning of tests; Improve execution of tests; Create a vibration, acoustics, and shock test database; and Integrate analysis and test data. The software package includes modules pertaining to sinusoidal and random vibration, shock and time replication, acoustics, base-driven modal survey, and mass properties and static/dynamic balance. The program is commanded by use of ActiveX controls. There is minimal need to generate command lines. Analysis or test files are selected by opening a Windows Explorer display. After selecting the desired input file, the program goes to a so-called analysis data process or test data process, depending on the type of input data. The status of the process is given by a Windows status bar, and when processing is complete, the data are reported in graphical, tubular, and matrix form.

  12. Results of the NASA Kennedy Space Center 50-MHz Doppler Radar Wind Profiler Operational Acceptance Test

    NASA Technical Reports Server (NTRS)

    Barbre', Robert E., Jr.; Decker, Ryan K.; Leahy, Frank B.; Huddleston, Lisa

    2016-01-01

    This paper presents results of the new Kennedy Space Center (KSC) 50-MHz Doppler Radar Wind Profiler (DRWP) Operational Acceptance Test (OAT). The goal of the OAT was to verify the data quality of the new DRWP against the performance of the previous DRWP in order to use wind data derived by the new DRWP for space launch vehicle operations support at the Eastern Range. The previous DRWP was used as a situational awareness asset for mission operations to identify rapid changes in the wind environment that weather balloons cannot depict. The Marshall Space Flight Center's Natural Environments Branch assessed data from the new DRWP collected during Jan-Feb 2015 against a specified set of test criteria. Data examination verified that the DRWP provides complete profiles every five minutes from 1.8-19.5 km in vertical increments of 150 m. Analysis of 49 concurrent DRWP and balloon profiles presented root mean square wind component differences around 2.0 m/s. Evaluation of the DRWP's coherence between five-minute wind pairs found the effective vertical resolution to be Nyquist-limited at 300 m for both wind components. In addition, the sensitivity to rejecting data that do not have adequate signal was quantified. This paper documents the data, quality control procedures, methodology, and results of each analysis.

  13. CLIC RF High Power Production Testing Program

    SciTech Connect

    Syratchev, I.; Riddone, G.; Tantawi, S.G.; /SLAC

    2011-11-02

    The CLIC Power Extraction and Transfer Structure (PETS) is a passive microwave device in which bunches of the drive beam interact with the impedance of the periodically loaded waveguide and generate RF power for the main linac accelerating structure. The demands on the high power production ({approx} 150 MW) and the needs to transport the 100 A drive beam for about 1 km without losses, makes the PETS design rather unique and the operation very challenging. In the coming year, an intense PETS testing program will be implemented. The target is to demonstrate the full performance of the PETS operation. The testing program overview and test results available to date are presented.

  14. Peach Bottom test element program. Final report

    SciTech Connect

    Saurwein, J.J.; Holzgraf, J.F.; MIller, C.M.; Myers, B.F.; Wallroth, C.F.

    1982-11-01

    Thirty-three test elements were irradiated in the Peach Bottom high-temperature gas-cooled reactor (HTGR) as part of the testing program for advanced HTGRs. Extensive postirradiation examinations and evaluations of 21 of these irradiation experiments were performed. The test element irradiations were simulated using HTGR design codes and data. Calculated fuel burnups, power profiles, fast neutron fluences, and temperatures were verified via destructive burnup measurements, gamma scanning, and in-pile thermocouple readings corrected for decalibration effects. Analytical techniques were developed to improve the quality of temperature predictions through feedback of nuclear measurements into thermal calculations. Dimensional measurements, pressure burst tests, diametral compression tests, ring-cutting tests, strip-cutting tests, and four-point bend tests were performed to measure residual stress, strain, and strength distributions in H-327 graphite structures irradiated in the test elements.

  15. Feasibility and acceptability of a volunteer-mediated diversional therapy program for older patients with cognitive impairment.

    PubMed

    Wong Shee, Anna; Phillips, Bev; Hill, Keith; Dodd, Karen

    2014-01-01

    Understanding the perceptions of stakeholders is critical for determining acceptability and feasibility of volunteer-mediated programs. This study evaluated the feasibility and acceptability for staff, volunteers, patients and their carers, of a volunteer diversional therapy program for patients with cognitive impairment undergoing inpatient rehabilitation. Post-program structured interviews were conducted with the volunteers (n = 10), patients (n = 30) and their carers (n = 3); and nursing staff (n = 6) participated in a focus group. Thematic analysis identified five themes (values, attitudes, knowledge, purpose, support) in two dimensions (personal, team culture). Overall, patients, carers, staff and volunteers were satisfied with the volunteer program and perceived benefits for quality of care. Recommendations for improvements to the program related to staff engagement with the program and the volunteers' education and training. The volunteer diversional therapy pilot program for patients with cognitive impairment on a sub-acute ward was acceptable and feasible for patients, carers, staff and volunteers. PMID:24755195

  16. Engineering data transfer test with EDCARS using MIL-R-28002 (Raster). Laboratory Acceptance Test and User Application Test

    SciTech Connect

    Not Available

    1992-04-17

    This paper documents the results of a sequence of tests conducted to evaluate the DoD Computer-aided Acquisition and Logistic Support (CALS) data interchange capability of the Air Force Engineering Data Computer-Assisted Retrieval System (EDCARS). The CALS initiative specifies a standard digital interface to streamline the interchange of technical data between the DoD and the commercial sector. The CALS Test Network (CTN) is tasked to conduct tests of military standards which specify this digital interface. The testing results outlined in this report are intended to evaluate the EDCARS systems`s ability to sport CALS data interchanges and establish the level of technical data interoperability implemented at this DoD engineering data repository.

  17. Development and acceptability testing of ready-to-use supplementary food made from locally available food ingredients in Bangladesh

    PubMed Central

    2014-01-01

    Background Inadequate energy and micronutrient intake during childhood is a major public health problem in developing countries. Ready-to-use supplementary food (RUSF) made of locally available food ingredients can improve micronutrient status and growth of children. The objective of this study was to develop RUSF using locally available food ingredients and test their acceptability. Methods A checklist was prepared of food ingredients available and commonly consumed in Bangladesh that have the potential of being used for preparing RUSF. Linear programming was used to determine possible combinations of ingredients and micronutrient premix. To test the acceptability of the RUSF compared to Pushti packet (a cereal based food-supplement) in terms of amount taken by children, a clinical trial was conducted among 90 children aged 6–18 months in a slum of Dhaka city. The mothers were also asked to rate the color, flavor, mouth-feel, and overall liking of the RUSF by using a 7-point Hedonic Scale (1 = dislike extremely, 7 = like extremely). Results Two RUSFs were developed, one based on rice-lentil and the other on chickpea. The total energy obtained from 50 g of rice-lentil, chickpea-based RUSF and Pushti packet were 264, 267 and 188 kcal respectively. Children were offered 50 g of RUSF and they consumed (mean ± SD) 23.8 ± 14 g rice-lentil RUSF, 28.4 ± 15 g chickpea based RUSF. Pushti packet was also offered 50 g but mothers were allowed to add water, and children consumed 17.1 ± 14 g. Mean feeding time for two RUSFs and Pushti packet was 20.9 minutes. Although the two RUSFs did not differ in the amount consumed, there was a significant difference in consumption between chickpea-based RUSF and Pushti packet (p = 0.012). Using the Hedonic Scale the two RUSFs were more liked by mothers compared to Pushti packet. Conclusions Recipes of RUSF were developed using locally available food ingredients. The study results suggest that rice

  18. Evaluation of three soil toxicity tests used to monitor acceptable endpoints

    SciTech Connect

    Brinkmann, M.; Stroo, H.; Leuschner, A.; Leuteritz, D.; Stromberg, M.; Brourman, M.

    1995-12-31

    Three terrestrial toxicity tests were used to evaluate the efficacy of biological treatment of creosote and pentachlorophenol impacted soils at a Superfund site. Microtox, 5-day lettuce seed, and 14-day earthworm toxicity tests were performed on 10 soil samples at the beginning and end of 3 months of land treatment. Secondary endpoints of root length and earthworm weight loss were also evaluated. EC50 and LC50 values were calculated using a Trimmed Logit Statistical Program and compared to toxicity of 10 background samples collected from the site. Results for initial soils demonstrated toxicity with three of the five endpoints. End treatment results showed no measurable toxicity using all endpoints. Toxicity testing results are critical for obtaining regulatory approval for the full-scale treatment system. Post treatment closure requirements for the site will be based on bioassay results. Evaluation of the three tests used showed the Microtox test to be the most sensitive to this type of toxicity. Lettuce seed germination results were the least sensitive of the three primary endpoints chosen. Of the secondary endpoint criteria, root length demonstrated reliable EC50 values and showed toxicity trends similar to Microtox and earthworm tests. The earthworm weight loss endpoint was not a useful toxicity measurement at 14 days.

  19. Waste Acceptance Testing of Secondary Waste Forms: Cast Stone, Ceramicrete and DuraLith

    SciTech Connect

    Mattigod, Shas V.; Westsik, Joseph H.; Chung, Chul-Woo; Lindberg, Michael J.; Parker, Kent E.

    2011-08-12

    To support the selection of a waste form for the liquid secondary wastes from WTP, Washington River Protection Solutions has initiated secondary-waste-form testing work at Pacific Northwest National Laboratory (PNNL). In anticipation of a down-selection process for a waste form for the Solidification Treatment Unit to be added to the ETF, PNNL is conducting tests on four candidate waste forms to evaluate their ability to meet potential waste acceptance criteria for immobilized secondary wastes that would be placed in the IDF. All three waste forms demonstrated compressive strengths above the minimum 3.45 MPa (500 psi) set as a target for cement-based waste forms. Further, none of the waste forms showed any significant degradation in compressive strength after undergoing thermal cycling (30 cycles in a 10 day period) between -40 C and 60 C or water immersion for 90 days. The three leach test methods are intended to measure the diffusion rates of contaminants from the waste forms. Results are reported in terms of diffusion coefficients and a leachability index (LI) calculated based on the diffusion coefficients. A smaller diffusion coefficient and a larger LI are desired. The NRC, in its Waste Form Technical Position (NRC 1991), provides recommendations and guidance regarding methods to demonstrate waste stability for land disposal of radioactive waste. Included is a recommendation to conduct leach tests using the ANS 16.1 method. The resulting leachability index (LI) should be greater than 6.0. For Hanford secondary wastes, the LI > 6.0 criterion applies to sodium leached from the waste form. For technetium and iodine, higher targets of LI > 9 for Tc and LI > 11 for iodine have been set based on early waste-disposal risk and performance assessment analyses. The results of these three leach tests conducted for a total time between 11days (ASTM C1308) to 90 days (ANS 16.1) showed: (1) Technetium diffusivity: ANSI/ANS 16.1, ASTM C1308, and EPA 1315 tests indicated that

  20. Food Deserts in Leon County, FL: Disparate Distribution of Supplemental Nutrition Assistance Program-Accepting Stores by Neighborhood Characteristics

    ERIC Educational Resources Information Center

    Rigby, Samantha; Leone, Angela F.; Kim, Hwahwan; Betterley, Connie; Johnson, Mary Ann; Kurtz, Hilda; Lee, Jung Sun

    2012-01-01

    Objective: Examine whether neighborhood characteristics of racial composition, income, and rurality were related to distribution of Supplemental Nutrition Assistance Program (SNAP)-accepting stores in Leon County, Florida. Design: Cross-sectional; neighborhood and food store data collected in 2008. Setting and Participants: Forty-eight census…

  1. A Therapeutic Module Designed to Be Delivered to Parents Whose Children Were Recently Not Accepted into the Gifted Program

    ERIC Educational Resources Information Center

    Suarez, Brandon

    2009-01-01

    The parents/caretakers of a student who was recently not accepted into the gifted program are often not provided counseling support to reconceptualize their child's strengths and needs. Because the child is not labeled gifted, the parents' new attitudes toward the child, themselves and the education system may negatively impact the choices they…

  2. The Tailored Activity Program to Reduce Behavioral Symptoms in Individuals with Dementia: Feasibility, Acceptability, and Replication Potential

    ERIC Educational Resources Information Center

    Gitlin, Laura N.; Winter, Laraine; Earland, Tracey Vause; Herge, E. Adel; Chernett, Nancy L.; Piersol, Catherine V.; Burke, Janice P.

    2009-01-01

    Purpose: The Tailored Activity Program (TAP) is a home-based occupational therapy intervention shown to reduce behavioral symptoms and caregiver burden in a randomized trial. This article describes TAP, its assessments, acceptability, and replication potential. Design and Methods: TAP involves 8 sessions for a period of 4 months. Interventionists…

  3. Establishing an Accepted Skill Set and Knowledge Base for Directors of University and College Intensive English Programs

    ERIC Educational Resources Information Center

    Forbes, Megan Julie

    2012-01-01

    The purpose of this study was to establish an accepted skill set, knowledge base, and overview of personal qualities necessary to be a director of a university or college based, non-proprietary intensive English program (UIEP). This research serves as a means of moving towards meeting three critical needs in the field. This research should inform…

  4. Delinquency and Peer Acceptance in Adolescence: A Within-Person Test of Moffitt's Hypotheses

    ERIC Educational Resources Information Center

    Rulison, Kelly L.; Kreager, Derek A.; Osgood, D. Wayne

    2014-01-01

    We tested 2 hypotheses derived from Moffitt's (1993) taxonomic theory of antisocial behavior, both of which are central to her explanation for the rise in delinquency during adolescence. We tested whether persistently delinquent individuals become more accepted by their peers during adolescence and whether individuals who abstain from…

  5. Value Acceptance on Adolescent Socialization: A Test of a Cognitive-Functional Theory of Television Effects.

    ERIC Educational Resources Information Center

    Tan, Alexis; Nelson, Leigh; Dong, Qingwen; Tan, Gerdean

    1997-01-01

    Presents a cognitive-functional explanation of television's influence on Anglo-American, Native American, and Hispanic adolescents' acceptance of values. Finds that adolescents accepted values observed in television when they recognized them (a measure of learning) and when they evaluated the values to be important in "being successful" in the…

  6. Report on the Acceptance Test of the CRI Y-MP 8128, 10 February - 12 March 1990

    NASA Technical Reports Server (NTRS)

    Carter, Russell; Kutler, Paul (Technical Monitor)

    1998-01-01

    The NAS Numerical Aerodynamic Simulation Facility's HSP 2 computer system, a CRI Y-MP 832 SN #1002, underwent a major hardware upgrade in February of 1990. The 32 MWord, 6.3 ns mainframe component of the system was replaced with a 128 MWord, 6.0 ns CRI Y-MP 8128 mainframe, SN #1030. A 30 day Acceptance Test of the computer system was performed by the NAS RND HSP group from 08:00 February 10, 1990 to 08:00 March 12, 1990. Overall responsibility for the RND HSP Acceptance Test was assumed by Duane Carbon. The terms of the contract required that the SN #1030 achieve an effectiveness level of greater than or equal to ninety (90) percent for 30 consecutive days within a 60 day time frame. After the first thirty days, the effectiveness level of SN #1030 was 94.4 percent, hence the acceptance test was passed.

  7. The NASA atomic oxygen effects test program

    NASA Technical Reports Server (NTRS)

    Banks, Bruce A.; Rutledge, Sharon K.; Brady, Joyce A.

    1988-01-01

    The NASA Atomic Oxygen Effects Test Program was established to compare the low earth orbital simulation characteristics of existing atomic oxygen test facilities and utilize the collective data from a multitude of simulation facilities to promote understanding of mechanisms and erosion yield dependence upon energy, flux, metastables, charge, and environmental species. Four materials chosen for this evaluation include Kapton HN polyimide, FEP Teflon, polyethylene, and graphite single crystals. The conditions and results of atomic oxygen exposure of these materials is reported by the participating organizations and then assembled to identify degrees of dependency of erosion yields that may not be observable from any single atomic oxygen low earth orbital simulation facility. To date, the program includes 30 test facilities. Characteristics of the participating test facilities and results to date are reported.

  8. A data base and a standard material for use in acceptance testing of low-activity waste products

    SciTech Connect

    Wolf, S.F.; Ebert, W.L.; Luo, J.S.; Strachan, D.M.

    1998-04-01

    The authors have conducted replicate dissolution tests following the product consistency test (PCT) procedure to measure the mean and standard deviation of the solution concentrations of B, Na, and Si at various combinations of temperature, duration, and glass/water mass ratio. Tests were conducted with a glass formulated to be compositionally similar to low-activity waste products anticipated for Hanford to evaluate the adequacy of test methods that have been designated in privatization contracts for use in product acceptance. An important finding from this set of tests is that the solution concentrations generated in tests at 20 C will likely be too low to measure the dissolution rates of waste products reliably. Based on these results, the authors recommend that the acceptance test be conducted at 40 C. Tests at 40 C generated higher solution concentrations, were more easily conducted, and the measured rates were easily related to those at 20 C. Replicate measurements of other glass properties were made to evaluate the possible use of LRM-1 as a standard material. These include its composition, homogeneity, density, compressive strength, the Na leachability index with the ANSI/ANS 16.1 leach test, and if the glass is characteristically hazardous with the toxicity characteristic leach procedure. The values of these properties were within the acceptable limits identified for Hanford low-activity waste products. The reproducibility of replicate tests and analyses indicates that the glass would be a suitable standard material.

  9. THAI Multi-Compartment Containment Test Program

    SciTech Connect

    Kanzleiter, T.; Poss, G.; Funke, F.; Allelein, H.J.

    2006-07-01

    The THAI experimental programme includes combined-effect investigations on thermal hydraulics, hydrogen, and fission product (iodine and aerosols) behaviour in LWR containments under severe accident conditions. An overview on the experiments performed up to now and on the future test program is presented, in combination with a selection of typical results to illustrate the versatility of the test facility and the broad variety of topics investigated. (authors)

  10. Cooperative field test program for wind systems

    SciTech Connect

    Bollmeier, W.S. II; Dodge, D.M.

    1992-03-01

    The objectives of the Federal Wind Energy Program, managed by the US Department of Energy (DOE), are (1) to assist industry and utilities in achieving a multi-regional US market penetration of wind systems, and (2) to establish the United States as the world leader in the development of advanced wind turbine technology. In 1984, the program conducted a series of planning workshops with representatives from the wind energy industry to obtain input on the Five-Year Research Plan then being prepared by DOE. One specific suggestion that came out of these meetings was that the federal program should conduct cooperative research tests with industry to enhance the technology transfer process. It was also felt that the active involvement of industry in DOE-funded research would improve the state of the art of wind turbine technology. DOE established the Cooperative Field Test Program (CFTP) in response to that suggestion. This program was one of the first in DOE to feature joint industry-government research test teams working toward common objectives.

  11. United States Ski Team Fitness Testing Program.

    ERIC Educational Resources Information Center

    Gettman, Larry R.

    Presented is a fitness profile designed to identify the individual athlete's strengths and weaknesses. Specifically, the areas of fitness examined are a) muscular strength; b) cardiovascular respiratory function; c) body composition; and d) motor abilities, agility, and speed. The procedures in the testing program involve the following: a) the…

  12. Computer Program for Space-Shuttle Testing

    NASA Technical Reports Server (NTRS)

    Hyman, M. D.; Fine, G. H.; Hollombe, G. J.

    1986-01-01

    Demand on Space Shuttle general-purpose computers reduced. Simulations Testbed and Scenario Pre-processor (STB&SPP) system reduces need for use of GPC's in hardware and software development and testing. System consists of computer program, SPP, and set of utility subroutines, STB, which incorporates Interface Simulator (ISIM). STB&SPP system written in FORTRAN V and Assembler.

  13. 47 CFR 73.1620 - Program tests.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... of an AM, FM, TV or Class A TV station in accordance with the terms of the construction permit, the... or FM station, or a nondirectional or directional TV or Class A TV station, may begin program tests... license. (f) The licensee of a UHF TV station which is not in operation on, but assigned to, the...

  14. 47 CFR 73.1620 - Program tests.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... of an AM, FM, TV or Class A TV station in accordance with the terms of the construction permit, the... or FM station, or a nondirectional or directional TV or Class A TV station, may begin program tests... license. (f) The licensee of a UHF TV station which is not in operation on, but assigned to, the...

  15. Crime Laboratory Proficiency Testing Research Program.

    ERIC Educational Resources Information Center

    Peterson, Joseph L.; And Others

    A three-year research effort was conducted to design a crime laboratory proficiency testing program encompassing the United States. The objectives were to: (1) determine the feasibility of preparation and distribution of different classes of physical evidence; (2) assess the accuracy of criminalistics laboratories in the processing of selected…

  16. 40 CFR 86.1830-01 - Acceptance of vehicles for emission testing.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) General Compliance Provisions for Control of Air Pollution From New and In-Use Light-Duty Vehicles, Light-Duty Trucks, and Complete Otto-Cycle Heavy-Duty Vehicles § 86.1830-01 Acceptance...

  17. 40 CFR 86.1830-01 - Acceptance of vehicles for emission testing.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) General Compliance Provisions for Control of Air Pollution From New and In-Use Light-Duty Vehicles, Light-Duty Trucks, and Complete Otto-Cycle Heavy-Duty Vehicles § 86.1830-01 Acceptance...

  18. 40 CFR 86.1830-01 - Acceptance of vehicles for emission testing.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) General Compliance Provisions for Control of Air Pollution From New and In-Use Light-Duty Vehicles, Light-Duty Trucks, and Complete Otto-Cycle Heavy-Duty Vehicles § 86.1830-01 Acceptance...

  19. 40 CFR 86.1830-01 - Acceptance of vehicles for emission testing.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) General Compliance Provisions for Control of Air Pollution From New and In-Use Light-Duty Vehicles, Light-Duty Trucks, and Complete Otto-Cycle Heavy-Duty Vehicles § 86.1830-01 Acceptance...

  20. Reduced-Enrichment Research and Test Reactor Program: Environmental assessment

    SciTech Connect

    Not Available

    1980-05-01

    The principal program objective and principal part of the proposed action is to improve the proliferation resistance of nuclear fuels used in research and test reactors by providing the technical means (through technical development, design, and testing) for reducing the uranium enrichment requirements of these fuels to substantially less than the 90 to 93% enrichment currently used. Operator acceptance of the reduced-enrichment-uranium (REU) fuel alternative will require minimizing of reactor performance reduction, fuel cycle cost increases, the number of new safety and licensing issues raised, and reactor and facility modifications. The other part of the proposed action is to assure the capability for commercial production and supply of REU fuel for use both in the US and abroad. The RERTR Program scope is limited to generic design studies, technical support to reactor operating organizations in preparing for conversions to REU fuels, fuel development, fuel demonstrations, and technical support for commercialization of REU fuels. This environmental assessment addresses the environmental consequences of RERTR Program activities and of specific conversions of typical reactors (the Ford Nuclear Reactor and one or two other to-be-designated demonstrations) to REU-fuel cycles, including domestic and international shipments of enriched uranium pertinent to the conduct of RERTR Program activities.

  1. The use and acceptance of Other Scientifically Relevant Information (OSRI) in the U.S. Environmental Protection Agency (EPA) Endocrine Disruptor Screening Program.

    PubMed

    Bishop, Patricia L; Willett, Catherine E

    2014-02-01

    The U.S. Environmental Protection Agency (EPA) Endocrine Disruptor Screening Program (EDSP) currently relies on an initial screening battery (Tier 1) consisting of five in vitro and six in vivo assays to evaluate a chemical's potential to interact with the endocrine system. Chemical companies may request test waivers based on Other Scientifically Relevant Information (OSRI) that is functionally equivalent to data gathered in the screening battery or that provides information on a potential endocrine effect. Respondents for 47 of the first 67 chemicals evaluated in the EDSP submitted OSRI in lieu of some or all Tier 1 tests, seeking 412 waivers, of which EPA granted only 93. For 20 of the 47 chemicals, EPA denied all OSRI and required the entire Tier 1 battery. Often, the OSRI accepted was either identical to data generated by the Tier 1 assay or indicated a positive result. Although identified as potential sources of OSRI in EPA guidance, Part 158 guideline studies for pesticide registration were seldom accepted by EPA. The 93 waivers reduced animal use by at least 3325 animals. We estimate 27,731 animals were used in the actual Tier 1 tests, with additional animals being used in preparation for testing. Even with EPA's shift toward applying 21st-century toxicology tools to screening of endocrine disruptors in the future, acceptance of OSRI will remain a primary means for avoiding duplicative testing and reducing use of animals in the EDSP. Therefore, it is essential that EPA develop a consistent and transparent basis for accepting OSRI. PMID:24151143

  2. Maglev program test plan. Final report

    SciTech Connect

    deBenedet, D.; Gilchrist, A.J.; Karanian, L.A.

    1992-07-01

    Maglev systems represent a promising evolution in the high-speed ground transportation, offering speeds in excess of 300 mph along with the potential for low operating costs and minimal environmental impact. The goal of this effort is to investigate the feasibility and viability of maglev systems in the United States. The emergence of a sophisticated technology such as maglev requires a need for a coordinated research test program and the determination of test requirements to identify and mitigate development risk and to maximize the use of domestic resources. The study is directed toward the identification and characterization of maglev systems development risks tied to a preliminary system architecture. Research objectives are accomplished by surveying experiences from previous maglev development programs, both foreign and domestic, and interviews with individuals involved with maglev research and testing. Findings include ninety-four distinct development risks and twenty risk types. Planning and implementation requirements are identified for a maglev test program, including the development of a facilities strategy to meet any operational concepts that evolve out of early development effort. Also specified is the logical development flow and associated long-lead support needs for sub-scale and full-scale testing.

  3. HIV-Related Stigma, Social Norms and HIV Testing in Soweto and Vulindlela, South Africa: NIMH Project Accept (HPTN 043)

    PubMed Central

    Young, Sean D.; Hlavka, Zdenek; Modiba, Precious; Gray, Glenda; Van Rooyen, Heidi; Richter, Linda; Szekeres, Greg; Coates, Thomas

    2010-01-01

    Objective HIV testing is necessary to curb the increasing epidemic. However, HIV-related stigma and perceptions of low likelihood of societal HIV testing may reduce testing rates. This study aimed to explore this association in South Africa, where HIV rates are extraordinarily high. Methods Data were taken from the Soweto and Vulindlela, South African sites of Project Accept, a multi-national HIV prevention trial. Self-reported HIV testing, stigma, and social norms items were used to study the relationship between HIV testing, stigma, and perceptions about societal testing rates. The stigma items were broken into 3 factors: negative attitudes, negative perceptions about people living with HIV, and perceptions of fair treatment for people living with HIV (equity). Results Results from a univariate logistic regression suggest that past history of HIV testing was associated with decreased negative attitudes about people living with HIV/AIDS, increased perceptions that people living with HIV/AIDS experience discrimination, and increased perceptions that people with HIV should be treated equitably. Results from a multivariate logistic regression confirm these effects and suggests these differences vary according to gender and age. Compared to people who had never tested for HIV, those who had previously tested were more likely to believe that the majority of people have tested for HIV. Conclusion Data suggest that interventions designed to increase HIV testing in South Africa should address stigma and perceptions of societal testing. Keywords: stigma, HIV testing, South Africa, Project Accept PMID:20980913

  4. Feasibility and Acceptability of a Gardening-Based Nutrition Education Program in Preschoolers from Low-Income, Minority Populations

    ERIC Educational Resources Information Center

    Sharma, Shreela V.; Hedberg, Ann Marie; Skala, Katherine A.; Chuang, Ru-Jye; Lewis, Tamara

    2015-01-01

    Garden-based lessons are gaining popularity as a means of increasing fruit and vegetable intake among children. The study objective was to pilot test a garden-based preschool curriculum for feasibility and acceptability in Harris County Department of Education Head Start using qualitative and quantitative methods. A total of 103, 3- to 5-year-old…

  5. Static tests of the propulsion system. [Propfan Test Assessment program

    NASA Technical Reports Server (NTRS)

    Withers, C. C.; Bartel, H. W.; Turnberg, J. E.; Graber, E. J.

    1987-01-01

    Advanced, highly-loaded, high-speed propellers, called propfans, are promising to revolutionize the transport aircraft industry by offering a 15- to 30-percent fuel savings over the most advanced turbofans without sacrificing passenger comfort or violating community noise standards. NASA Lewis Research Center and industry have been working jointly to develop the needed propfan technology. The NASA-funded Propfan Test Assessment (PTA) Program represents a key element of this joint program. In PTA, Lockheed-Georgia, working in concert with Hamilton Standard, Rohr Industries, Gulfstream Aerospace, and Allison, is developing a propfan propulsion system which will be mounted on the left wing of a modified Gulfstream GII aircraft and flight tested to verify the in-flight characteristics of a 9-foot diameter, single-rotation propfan. The propfan, called SR-7L, was designed and fabricated by Hamilton Standard under a separate NASA contract. Prior to flight testing, the PTA propulsion system was static tested at the Rohr Brown Field facility. In this test, propulsion system operational capability was verified and data was obtained on propfan structural response, system acoustic characteristics, and system performance. This paper reports on the results of the static tests.

  6. Acceptance Testing of a Satellite SCADA Photovoltaic-Diesel Hybrid System

    NASA Technical Reports Server (NTRS)

    Kalu, Alex; Acosta, R.; Durand, S.; Emrich, Carol; Ventre, G.; Wilson, W.

    1999-01-01

    Savannah State University (SSU) and the Florida Solar Energy Center (FSEC) have been participating in the NASA Advanced Communications Technology Satellite (ACTS) program for the last five years. This program was designed by NASA to help maintain U.S. leadership in commercial space communications by funding high-risk research, and to flight-test next-generation digital satellite components. Launched in 1993, ACTS is an U.S. government funded technology test-bed that incorporates high power Ka-band transponders, small spot beams, and on-board digital storage and switching technology. Associated with the spacecraft, is a prototype satellite control center that supports various application experiments. The SSU/FSEC application experiment is to developing a Photovoltaic-Diesel Hybrid Power system complete with satellite Supervisory Control and Data Acquisition (SCADA). The hybrid system was design to demonstrate the feasibility of using SCADA to maintain and operate remote village power systems. This configuration would enable experts at a central location to provide technical assistance to local technicians while they acquire a measure of proficiency with the hybrid system operation and maintenance. Upon full mastery of the technology, similar SCADA arrangement are planned to remotely monitor and control constellation of hybrid systems scattered overlarge rural areas. Two Orion Energy APEX-1000 hybrid systems were delivered in 1998, one was installed at SSU in eastern Georgia and the other was installed at FSEC in Central Florida. The project was designed to: (1) evaluate the performance of ACTS in a SCADA arrangement, (2) monitor the health and performance of all major hybrid subsystems, (3) investigate load control and battery charging strategies to maximize battery capacity and lifetime, and (4) develop satellite communication protocol. Preliminary results indicate that the hybrid design is suitable for satellite Supervisory Control and Data Acquisition. A

  7. Plutonium Immobilization Program cold pour tests

    SciTech Connect

    Hovis, G.L.; Stokes, M.W.; Smith, M.E.; Wong, J.W.

    1999-07-01

    The Plutonium Immobilization Program (PIP) is a joint venture between the Savannah River Site, Lawrence Livermore National Laboratory, Argonne National Laboratory, and Pacific Northwest National Laboratory to carry out the disposition of excess weapons-grade plutonium. This program uses the can-in-canister (CIC) approach. CIC involves encapsulating plutonium in ceramic forms (or pucks), placing the pucks in sealed stainless steel cans, placing the cans in long cylindrical magazines, latching the magazines to racks inside Defense Waste Processing Facility (DWPF) canisters, and filling the DWPF canisters with high-level waste glass. This process puts the plutonium in a stable form and makes it attractive for reuse. At present, the DWPF pours glass into empty canisters. In the CIC approach, the addition of a stainless steel rack, magazines, cans, and ceramic pucks to the canisters introduces a new set of design and operational challenges: All of the hardware installed in the canisters must maintain structural integrity at elevated (molten-glass) temperatures. This suggests that a robust design is needed. However, the amount of material added to the DWPF canister must be minimized to prevent premature glass cooling and excessive voiding caused by a large internal thermal mass. High metal temperatures, minimizing thermal mass, and glass flow paths are examples of the types of technical considerations of the equipment design process. To determine the effectiveness of the design in terms of structural integrity and glass-flow characteristics, full-scale testing will be conducted. A cold (nonradioactive) pour test program is planned to assist in the development and verification of a baseline design for the immobilization canister to be used in the PIP process. The baseline design resulting from the cold pour test program and CIC equipment development program will provide input to Title 1 design for second-stage immobilization. The cold pour tests will be conducted in two

  8. A Randomized Controlled Trial of Acceptance-Based Behavior Therapy and Cognitive Therapy for Test Anxiety: A Pilot Study

    ERIC Educational Resources Information Center

    Brown, Lily A.; Forman, Evan M.; Herbert, James D.; Hoffman, Kimberly L.; Yuen, Erica K.; Goetter, Elizabeth M.

    2011-01-01

    Many university students suffer from test anxiety that is severe enough to impair performance. Given mixed efficacy results of previous cognitive-behavior therapy (CBT) trials and a theoretically driven rationale, an acceptance-based behavior therapy (ABBT) approach was compared to traditional CBT (i.e., Beckian cognitive therapy; CT) for the…

  9. Empirical Testing of a Theoretical Extension of the Technology Acceptance Model: An Exploratory Study of Educational Wikis

    ERIC Educational Resources Information Center

    Liu, Xun

    2010-01-01

    This study extended the technology acceptance model and empirically tested the new model with wikis, a new type of educational technology. Based on social cognitive theory and the theory of planned behavior, three new variables, wiki self-efficacy, online posting anxiety, and perceived behavioral control, were added to the original technology…

  10. 10 CFR 51.108 - Public hearings on Commission findings that inspections, tests, analyses, and acceptance criteria...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... CFR 52.103(b), the Commission will not admit any contentions on environmental issues, the adequacy of... finding under 10 CFR 52.103(g). materials licenses ..., tests, analyses, and acceptance criteria of combined licenses are met. 51.108 Section 51.108...

  11. Nevada Test Site Radiation Protection Program

    SciTech Connect

    Radiological Control Managers' Council, Nevada Test Site

    2007-08-09

    Title 10 Code of Federal Regulations (CFR) 835, 'Occupational Radiation Protection', establishes radiation protection standards, limits, and program requirements for protecting individuals from ionizing radiation resulting from the conduct of U.S. Department of Energy (DOE) activities. 10 CFR 835.101(a) mandates that DOE activities be conducted in compliance with a documented Radiation Protection Program (RPP) as approved by DOE. This document promulgates the RPP for the Nevada Test Site (NTS), related (onsite or offsite) DOE National Nuclear Security Administration Nevada Site Office (NNSA/NSO) operations, and environmental restoration offsite projects.

  12. Testing a developmental cascade model of emotional and social competence and early peer acceptance

    PubMed Central

    Blandon, Alysia Y.; Calkins, Susan D.; Grimm, Kevin J.; Keane, Susan P.; O’Brien, Marion

    2011-01-01

    A developmental cascade model of early emotional and social competence predicting later peer acceptance was examined in a community sample of 440 children across the ages of 2 to 7. Children’s externalizing behavior, emotion regulation, social skills within the classroom and peer acceptance were examined utilizing a multitrait-multimethod approach. A series of longitudinal cross-lag models that controlled for shared rater variance were fit using structural equation modeling. Results indicated there was considerable stability in children’s externalizing behavior problems and classroom social skills over time. Contrary to expectations, there were no reciprocal influences between externalizing behavior problems and emotion regulation, though higher levels of emotion regulation were associated with decreases in subsequent levels of externalizing behaviors. Finally, children’s early social skills also predicted later peer acceptance. Results underscore the complex associations among emotional and social functioning across early childhood. PMID:20883578

  13. Relay test program. Series 2 tests: Integral testing of relays and circuit breakers

    SciTech Connect

    Bandyopadhyay, K.K.; Kunkel, C.; Shteyngart, S.

    1994-02-01

    This report presents the results of a relay test program conducted by Brookhaven National Laboratory (BNL) under the sponsorship of the US Nuclear Regulatory Commission (NRC). The program is a continuation of an earlier test program the results of which were published in NUREG/CR-4867. The current program was carried out in two phases: electrical testing and vibration testing. The objective was primarily to focus on the electrical discontinuity or continuity of relays and circuit breaker tripping mechanisms subjected to electrical pulses and vibration loads. The electrical testing was conducted by KEMA-Powertest Company and the vibration testing was performed at Wyle Laboratories, Huntsville, Alabama. This report discusses the test procedures, presents the test data, includes an analysis of the data and provides recommendations regarding reliable relay testing.

  14. Factors influencing nursing students' acceptance of electronic health records for nursing education (EHRNE) software program.

    PubMed

    Kowitlawakul, Yanika; Chan, Sally Wai Chi; Pulcini, Joyce; Wang, Wenru

    2015-01-01

    The Institute of Medicine (IOM) and the Health Information Technology Act (2009) in America had recommended that electronic health records (EHRs) should be fully adopted by 2014. This has urged educational institutions to prepare healthcare professionals to be competent in using electronic health records (EHRs) while they are in schools. To equip nursing students with competency in using EHRs, an electronic health record for nursing education (EHRNE) has been developed and integrated it into nursing curricula. The purposes of the study were to investigate the factors influencing nursing students' acceptance of the EHRs in nursing education using the extended Technology Acceptance Model with self-efficacy as a conceptual framework. The study is a descriptive study design using self-reported questionnaires with 212 student participants. The IBM SPSS and AMOS 22.0 were used to analyze the data. The results showed that attitude toward using the EHRNE was the most influential factor on students' acceptance. The preliminary findings suggested that to enhance the students' acceptance of the EHRNE, cultivation of a positive attitude toward using this EHR as well as increasing the perceived usefulness is very important. Also, the study's framework could be used in guiding learning health informatics and be applied to nursing students. PMID:24947068

  15. Preliminary waste acceptance criteria for the ICPP spent fuel and waste management technology development program

    SciTech Connect

    Taylor, L.L.; Shikashio, R.

    1993-09-01

    The purpose of this document is to identify requirements to be met by the Producer/Shipper of Spent Nuclear Fuel/High-LeveL Waste SNF/HLW in order for DOE to be able to accept the packaged materials. This includes defining both standard and nonstandard waste forms.

  16. Balloon launched Viking decelerator test program

    NASA Technical Reports Server (NTRS)

    Moog, R. D.; Michel, F. C.

    1973-01-01

    Four BLDT flights were conducted during the summer of 1972. The purpose of these tests was to qualify the Viking parachute system behind the full-scale Viking entry vehicle over the maximum range of entry conditions anticipated in the Viking '75 soft landing on Mars. A summary of the test series is presented. Test conditions ranged from a Mach number of 2.0 to 0.5 and dynamic pressure from 11.7 to 4.4 psf. This range of conditions covers the uncertainty in entry conditions at Mars due to atmospheric and entry performance uncertainties. Emphasis is placed on parachute performance and simulated Mars entry vehicle motions as influenced by the parachute performance. Conclusions are presented regarding the ability of the parachute to perform within the operational parameters required for a successful soft Martian landing. A list of references which covers all reports in the qualification test program is included.

  17. The Mindful Way Through the Semester: An Investigation of the Effectiveness of an Acceptance-Based Behavioral Therapy Program on Psychological Wellness in First-Year Students.

    PubMed

    Danitz, Sara B; Orsillo, Susan M

    2014-07-01

    First-year students in higher education deal with an increasing number of mental health issues. Cost-effective and time-efficient programs that ease transitions and reduce risk of depression are needed. To date, programs informed by both cognitive-behavioral and acceptance-based-behavioral therapy (ABBT) approaches have produced some positive outcomes, but methodological limitations limit their utility. The aim of the present study was to address some of these limitations, by developing and preliminary testing the efficacy of a one-session ABBT intervention with first-year undergraduates and first-year law students. Ninety-eight first-year students were randomly assigned to receive either a single-session 90-min ABBT workshop within their first month of school or to a waitlist control condition. Students who received the intervention reported significantly less depression and more acceptance. Moreover, increase in acceptance over the course of the semester was associated with reductions in depression. Implications of these findings for future interventions are discussed. PMID:24452372

  18. Mars Exploration Rover thermal test program overview

    NASA Technical Reports Server (NTRS)

    Pauken, Michael T.; Kinsella, Gary; Novak, Keith; Tsuyuki, Glenn

    2004-01-01

    In January 2004, two Mars Exploration Rovers (MER) landed on the surface of Mars to begin their mission as robotic geologists. A year prior to these historic landings, both rovers and the spacecraft that delivered them to Mars, were completing a series of environmental tests in facilities at the Jet Propulsion Laboratory. This paper describes the test program undertaken to validate the thermal design and verify the workmanship integrity of both rovers and the spacecraft. The spacecraft, which contained the rover within the aeroshell, were tested in a 7.5 m diameter thermal vacuum chamber. Thermal balance was performed for the near earth (hot case) condition and for the near Mars (cold case) condition. A solar simulator was used to provide the solar boundary condition on the solar array. IR lamps were used to simulate the solar heat load on the aeroshell for the off-sun attitudes experienced by the spacecraft during its cruise to Mars. Each rover was tested separately in a 3.0 m diameter thermal vacuum chamber over conditions simulating the warmest and coldest expected Mars diurnal temperature cycles. The environmental tests were conducted in a quiescent nitrogen atmosphere at a pressure of 8 to 10 Torr. In addition to thermal balance testing, the science instruments on board the rovers were tested successfully in the extreme environmental conditions anticipated for the mission. A solar simulator was not used in these tests.

  19. Acceptability and Feasibility of HIV Self-Testing Among Transgender Women in San Francisco: A Mixed Methods Pilot Study.

    PubMed

    Lippman, Sheri A; Moran, Lissa; Sevelius, Jae; Castillo, Leslie S; Ventura, Angel; Treves-Kagan, Sarah; Buchbinder, Susan

    2016-04-01

    An estimated one in four transgender women (trans women) in the U.S. are infected with HIV. Rates of HIV testing are not commensurate with their risk, necessitating alternative strategies for early detection and care. We explored the feasibility and acceptability of HIV self-testing (HIVST) with 50 HIV-negative adult trans women in San Francisco. Participants received three self-test kits to perform once a month. Acceptability and behavioral surveys were collected as were 11 in-depth interviews (IDIs). Among 50 participants, 44 reported utilizing HIVST at least once; 94 % reported the test easy to use; 93 % said results were easy to read; and 91 % would recommend it to others. Most participants (68 %) preferred HIVST to clinic-based testing, although price was a key barrier to uptake. IDIs revealed a tension between desires for privacy versus support found at testing sites. HIVST for trans women was acceptable and feasible and requires careful consideration of linkage to support services. PMID:26511864

  20. Long-Term Materials Test Program: materials exposure test plan

    SciTech Connect

    1981-12-01

    The Long Term Materials Test Program is designed to identify promising corrosion resistant materials for coal-fired gas turbine applications. Resistance of materials to long term accelerated corrosion will be determined through realistic PFB environmental exposure of candidate turbine materials for up to 14,000 hours. Selected materials also will be evaluated for their ability to withstand the combined erosive and corrosive aspects of the PFB effluent. A pressurized fluidized bed combustor facility has been constructed at the General Electric Coal Utilization Research Laboratory at Malta, New York. The 12-inch diameter combustor will burn high sulfur coal with moderate-to-high chlorine and alkali levels and utilize dolomite as the sulfur sorbent. Hot gas cleanup is achieved using three stages of cyclone separators. Downstream of the cylone separators, a low velocity test section (approx. 30 ft/s) capable of housing 180 pin specimens 1/4'' diameter has been installed to assess the corrosion resistance of the various materials at three different temperatures ranging from 1300 to 1600/sup 0/F. Following the low velocity test section is a high velocity test section consisting of four cascades of airfoil shaped specimens, six specimens per cascade. This high velocity test section is being used to evaluate the combined effects of erosion and corrosion on the degradation of gas turbine materials at gas velocities of 800 to 1400 ft/s. This report summarizes the materials selection and materials exposure test plan for the Long Term Materials Test.

  1. 76 FR 27925 - Requirements for Maintenance of Inspections, Tests, Analyses, and Acceptance Criteria

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-13

    ...) part 52, ``Licenses, Certifications, and Approvals for Nuclear Power Plants,'' on April 18, 1989 (54 FR... construction was complete. See 54 FR 15371; April 18, 1989; at 15383 (second column). On August 28, 2007 (72 FR... Section 189.a(1)(B) of the AEA threshold for requesting a hearing on acceptance criteria. See 72 FR...

  2. Usage and acceptability of HIV self-testing in men who have sex with men in Hong Kong.

    PubMed

    Wong, Horas Tze Hoo; Tam, Hoi Yan; Chan, Denise Pui Chung; Lee, Shui Shan

    2015-03-01

    Whilst studies on over-the-counter HIV tests continue to accumulate after FDA's approval of OraQuick Advance in 2012, few have focused on men who have sex with men (MSM) in Asian cities. An internet survey was conducted on 1,122 MSM in Hong Kong, revealing a low usage (6.1 %) and acceptability rate (43.8 %) on self-testing despite its availability in the market. Hierarchical logistic regression models showed that having received relevant information and users' attitudes on self-testing were the determinants of usage and acceptability. These factors had greater effects than sexual behaviors and social-networking on MSM's decision on self-testing. Majority of ever self-testers only repeated the self-test after a non-negative result, and overall only 26.6 % went for a formal test subsequent to the self-test. Concerns regarding the tests' accuracy were expressed by respondents. In conclusion, appropriate and accessible information and evidence-based guidance are needed to incorporate self-testing into HIV prevention strategies targeting MSM. PMID:25145608

  3. Columbia University flow instability experimental program: Volume 6. Single annulus tests, transient test program

    SciTech Connect

    Dougherty, T.; Maciuca, C.; McAssey, E.V. Jr.; Reddy, D.G.; Yang, B.W.

    1992-09-01

    The coolant in the Savannah River Site (SRS) production nuclear reactor assemblies is circulated as a subcooled liquid under normal operating conditions. This coolant is evenly distributed throughout multiple annular flow channels with a uniform pressure profile across each coolant flow channel. During the postulated Loss of Coolant Accident (LOCA), which is initiated by a hypothetical guillotine pipe break, the coolant flow through the reactor assemblies is significantly reduced. The flow reduction and accompanying power reduction (after shutdown is initiated) occur in the first 1 to 2 seconds of the LOCA. This portion of the LOCA is referred to as the Flow Instability phase. This report presents the experimental results for the transient portion of the single annulus test program. The test program was designed to investigate the onset of flow instability in an annular geometry similar to the MARK 22 reactor. The test program involved testing of both a ribless heater and a ribbed heater under steady state as well as transient conditions. The ribbed heater testing is currently underway and will be reported separately. The steady state portion of this test program with ribless heater was completed and reported in report No. CU-HTRF-T3A. The present report presents transient test results obtained from a ribless, uniform annulus test section. A total of thirty five transients were conducted with six cases in which flow excursion occurred. No unstable conditions resulted for tests in which the steady state Q{sub ratio} OFI limit was not exceeded.

  4. Feasibility, acceptability, and initial efficacy of an online sexual health promotion program for LGBT youth: the Queer Sex Ed intervention.

    PubMed

    Mustanski, Brian; Greene, George J; Ryan, Daniel; Whitton, Sarah W

    2015-01-01

    Lesbian, gay, bisexual, and transgender (LGBT) youth experience multiple sexual health inequities driven, in part, by deficits in parental and peer support, school-based sex education programs, and community services. Research suggests that the Internet may be an important resource in the development of sexual health among LGBT youth. We examined the feasibility of recruiting youth in same-sex relationships into an online sexual health intervention, evaluated intervention acceptability, and obtained initial estimates of intervention efficacy. LGBT youth (16 to 20 years old) completed Queer Sex Ed (QSE), an online, multimedia sexual health intervention consisting of five modules. The final sample (N = 202) completed the pretest, intervention, and posttest assessments. The primary study outcomes were sexual orientation identity and self-acceptance (e.g., coming-out self-efficacy), sexual health knowledge (e.g., sexual functioning), relationship variables (e.g., communication skills), and safer sex (e.g., sexual assertiveness). Analyses indicated that 15 of the 17 outcomes were found to be significant (p < .05). Effect sizes ranged from small for sexual orientation (e.g., internalized homophobia) and relationship variables (e.g., communication skills) to moderate for safer sex (e.g., contraceptive knowledge) outcomes. This study demonstrated the feasibility, acceptability, and initial efficacy of QSE, an innovative online comprehensive sexual health program for LGBT youth. PMID:24588408

  5. How My Program Passed the Turing Test

    NASA Astrophysics Data System (ADS)

    Humphrys, Mark

    In 1989, the author put an ELIZA-like chatbot on the Internet. The conversations this program had can be seen - depending on how one defines the rules (and how seriously one takes the idea of the test itself) - as a passing of the Turing Test. This is the first time this event has been properly written. This chatbot succeeded due to profanity, relentless aggression, prurient queries about the user, and implying that they were a liar when they responded. The element of surprise was also crucial. Most chatbots exist in an environment where people expectto find some bots among the humans. Not this one. What was also novel was the onlineelement. This was certainly one of the first AI programs online. It seems to have been the first (a) AI real-time chat program, which (b) had the element of surprise, and (c) was on the Internet. We conclude with some speculation that the future of all of AI is on the Internet, and a description of the "World- Wide-Mind" project that aims to bring this about.

  6. Disaster victim investigation recommendations from two simulated mass disaster scenarios utilized for user acceptance testing CODIS 6.0.

    PubMed

    Bradford, Laurie; Heal, Jennifer; Anderson, Jeff; Faragher, Nichole; Duval, Kristin; Lalonde, Sylvain

    2011-08-01

    Members of the National DNA Data Bank (NDDB) of Canada designed and searched two simulated mass disaster (MD) scenarios for User Acceptance Testing (UAT) of the Combined DNA Index System (CODIS) 6.0, developed by the Federal Bureau of Investigation (FBI) and the US Department of Justice. A simulated airplane MD and inland Tsunami MD were designed representing a closed and open environment respectively. An in-house software program was written to randomly generate DNA profiles from a mock Caucasian population database. As part of the UAT, these two MDs were searched separately using CODIS 6.0. The new options available for identity and pedigree searching in addition to the inclusion of mitochondrial DNA (mtDNA) and Y-STR (short tandem repeat) information in CODIS 6.0, led to rapid identification of all victims. A Joint Pedigree Likelihood Ratio (JPLR) was calculated from the pedigree searches and ranks were stored in Rank Manager providing confidence to the user in assigning an Unidentified Human Remain (UHR) to a pedigree tree. Analyses of the results indicated that primary relatives were more useful in Disaster Victim Identification (DVI) compared to secondary or tertiary relatives and that inclusion of mtDNA and/or Y-STR technologies helped to link family units together as shown by the software searches. It is recommended that UHRs have as many informative loci possible to assist with their identification. CODIS 6.0 is a valuable technological tool for rapidly and confidently identifying victims of mass disasters. PMID:20620126

  7. Accuracy and Acceptability of Oral Fluid HIV Self-Testing in a General Adult Population in Kenya.

    PubMed

    Kurth, Ann E; Cleland, Charles M; Chhun, Nok; Sidle, John E; Were, Edwin; Naanyu, Violet; Emonyi, Wilfred; Macharia, Stephen M; Sang, Edwin; Siika, Abraham M

    2016-04-01

    We evaluated performance, accuracy, and acceptability parameters of unsupervised oral fluid (OF) HIV self-testing (HIVST) in a general population in western Kenya. In a prospective validation design, we enrolled 240 adults to perform rapid OF HIVST and compared results to staff administered OF and rapid fingerstick tests. All reactive, discrepant, and a proportion of negative results were confirmed with lab ELISA. Twenty participants were video-recorded conducting self-testing. All participants completed a staff administered survey before and after HIVST to assess attitudes towards OF HIVST acceptability. HIV prevalence was 14.6 %. Thirty-six of the 239 HIVSTs were invalid (15.1 %; 95 % CI 11.1-20.1 %), with males twice as likely to have invalid results as females. HIVST sensitivity was 89.7 % (95 % CI 73-98 %) and specificity was 98 % (95 % CI 89-99 %). Although sensitivity was somewhat lower than expected, there is clear interest in, and high acceptability (94 %) of OF HIV self-testing. PMID:26438487

  8. 15 CFR 996.33 - Acceptance of program by non-Federal entities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... ASSURANCE AND CERTIFICATION REQUIREMENTS FOR NOAA HYDROGRAPHIC PRODUCTS AND SERVICES QUALITY ASSURANCE AND CERTIFICATION REQUIREMENTS FOR NOAA HYDROGRAPHIC PRODUCTS AND SERVICES Other Quality Assurance Program Matters... information submitted to NOAA under this Program shall be deemed to be in the public domain, and...

  9. 15 CFR 996.33 - Acceptance of program by non-Federal entities.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... ASSURANCE AND CERTIFICATION REQUIREMENTS FOR NOAA HYDROGRAPHIC PRODUCTS AND SERVICES QUALITY ASSURANCE AND CERTIFICATION REQUIREMENTS FOR NOAA HYDROGRAPHIC PRODUCTS AND SERVICES Other Quality Assurance Program Matters... information submitted to NOAA under this Program shall be deemed to be in the public domain, and...

  10. International Space Station Environmental Control and Life Support System Acceptance Testing for Node 1 Temperature and Humidity Control Subsystem

    NASA Technical Reports Server (NTRS)

    Williams, David E.

    2011-01-01

    The International Space Station (ISS) Node 1 Environmental Control and Life Support (ECLS) System is comprised of five subsystems: Atmosphere Control and Storage (ACS), Atmosphere Revitalization (AR), Fire Detection and Suppression (FDS), Temperature and Humidity Control (THC), and Water Recovery and Management (WRM). This paper will provide a summary of the Node 1 ECLS THC subsystem design and a detailed discussion of the ISS ECLS Acceptance Testing methodology utilized for this subsystem.The International Space Station (ISS) Node 1 Environmental Control and Life Support (ECLS) System is comprised of five subsystems: Atmosphere Control and Storage (ACS), Atmosphere Revitalization (AR), Fire Detection and Suppression (FDS), Temperature and Humidity Control (THC), and Water Recovery and Management (WRM). This paper will provide a summary of the Node 1 ECLS THC subsystem design and a detailed discussion of the ISS ECLS Acceptance Testing methodology utilized for this subsystem.

  11. Acceptability and Feasibility of Sexually Transmitted Infection Testing and Treatment among Pregnant Women in Gaborone, Botswana, 2015.

    PubMed

    Wynn, Adriane; Ramogola-Masire, Doreen; Gaolebale, Ponatshego; Moshashane, Neo; Agatha Offorjebe, Ogechukwu; Arena, Kaitlin; Klausner, Jeffrey D; Morroni, Chelsea

    2016-01-01

    Introduction. Chlamydia trachomatis (CT), Neisseria gonorrhoeae (NG), and Trichomonas vaginalis (TV) are curable sexually transmitted infections (STIs) that can cause adverse maternal and birth outcomes. Most countries do not conduct routine testing during antenatal care. We present data on the acceptability and feasibility of testing and treating pregnant women for STIs in an antenatal clinic in Gaborone, Botswana. Materials and Methods. We offered CT, NG, and TV testing using self-collected vaginal swabs to eligible pregnant women. Participants received same-day test results. Those who tested positive were given treatment. Results. Among the 225 women who were eligible and recruited, 200 (89%) agreed to participate. The median age of our study sample was 30 years; most were unmarried (77%), with a median gestational age of 27 weeks and a 23% HIV prevalence. All participants received their results with at least 72% (n = 143) on the same day. Thirty participants (15%) tested positive for an STI, all were treated, and 24 (80%) were treated on the same day. Conclusion. The acceptability of STI testing was high, and the intervention was feasible. This study provides support for continued research into STI prevalence, cost-effectiveness, and the association of STIs with adverse maternal and infant outcomes. PMID:27119076

  12. Acceptability and Feasibility of Sexually Transmitted Infection Testing and Treatment among Pregnant Women in Gaborone, Botswana, 2015

    PubMed Central

    Wynn, Adriane; Ramogola-Masire, Doreen; Gaolebale, Ponatshego; Moshashane, Neo; Agatha Offorjebe, Ogechukwu; Arena, Kaitlin; Klausner, Jeffrey D.; Morroni, Chelsea

    2016-01-01

    Introduction. Chlamydia trachomatis (CT), Neisseria gonorrhoeae (NG), and Trichomonas vaginalis (TV) are curable sexually transmitted infections (STIs) that can cause adverse maternal and birth outcomes. Most countries do not conduct routine testing during antenatal care. We present data on the acceptability and feasibility of testing and treating pregnant women for STIs in an antenatal clinic in Gaborone, Botswana. Materials and Methods. We offered CT, NG, and TV testing using self-collected vaginal swabs to eligible pregnant women. Participants received same-day test results. Those who tested positive were given treatment. Results. Among the 225 women who were eligible and recruited, 200 (89%) agreed to participate. The median age of our study sample was 30 years; most were unmarried (77%), with a median gestational age of 27 weeks and a 23% HIV prevalence. All participants received their results with at least 72% (n = 143) on the same day. Thirty participants (15%) tested positive for an STI, all were treated, and 24 (80%) were treated on the same day. Conclusion. The acceptability of STI testing was high, and the intervention was feasible. This study provides support for continued research into STI prevalence, cost-effectiveness, and the association of STIs with adverse maternal and infant outcomes. PMID:27119076

  13. 49 CFR 180.511 - Acceptable results of inspections and tests.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... all product piping, fittings and closures show no indication of leakage. (g) Hydrostatic test. A Class 107 tank car or a riveted tank car successfully passes the hydrostatic test when it shows no leakage... before the next inspection and test interval. (b) Structural integrity inspection and test. A tank...

  14. [PFBC Hot Gas Cleanup Test Program

    SciTech Connect

    Not Available

    1992-10-01

    Four hundred and fifty four clay bonded silicon carbide Schumacher Dia Schumalith candle filters were purchased for installation in the Westinghouse Advanced Particle Filtration (APF) system at the American Electric Power (AEP) plant in Brilliant, Ohio. A surveillance effort has been identified which will monitor candle filter performance and life during hot gas cleaning in AEP's pressurized fluidized-bed combustion system. A description of the candle surveillance program, strategy for candle filter location selection, as well as candle filter post-test characterization is provided in this memo. The period of effort for candle filter surveillance monitoring is planned through March 1994.

  15. Human Factors Process Task Analysis: Liquid Oxygen Pump Acceptance Test Procedure at the Advanced Technology Development Center

    NASA Technical Reports Server (NTRS)

    Diorio, Kimberly A.; Voska, Ned (Technical Monitor)

    2002-01-01

    This viewgraph presentation provides information on Human Factors Process Failure Modes and Effects Analysis (HF PFMEA). HF PFMEA includes the following 10 steps: Describe mission; Define System; Identify human-machine; List human actions; Identify potential errors; Identify factors that effect error; Determine likelihood of error; Determine potential effects of errors; Evaluate risk; Generate solutions (manage error). The presentation also describes how this analysis was applied to a liquid oxygen pump acceptance test.

  16. International Space Station Environmental Control and Life Support System Acceptance Testing for Node 1 Atmosphere Control and Supply Subsystem

    NASA Technical Reports Server (NTRS)

    Williams, David E.

    2009-01-01

    The International Space Station (ISS) Node 1 Environmental Control and Life Support (ECLS) System is comprised of five subsystems: Atmosphere Control and Supply (ACS), Atmosphere Revitalization (AR), Fire Detection and Suppression (FDS), Temperature and Humidity Control (THC), and Water Recovery and Management (WRM). This paper provides a summary of the Node 1 ECLS ACS subsystem design and a detailed discussion of the ISS ECLS Acceptance Testing methodology utilized for that subsystem.

  17. Coal Ash Corrosion Resistant Materials Testing Program

    SciTech Connect

    McDonald, D K

    2003-04-22

    The "Coal Ash Corrosion Resistant Materials Testing Program" is being conducted by The Babcock & Wilcox Company (B&W), the U.S. Department of Energy (DOE) and the Ohio Coal Development Office (OCDO) at Reliant Energy's Niles plant in Niles, Ohio to provide full-scale, in-situ testing of recently developed boiler superheater materials. Fireside corrosion is a key issue for improving efficiency of new coal fired power plants and improving service life in existing plants. In November 1998, B&W began development of a system to permit testing of advanced tube materials at metal temperatures typical of advanced supercritical steam temperatures (1100°F and higher) in a boiler exhibiting coal ash corrosive conditions. Several materials producers including Oak Ridge National Laboratory (ORNL) contributed advanced materials to the project. In the spring of 1999 a system consisting of three identical sections, each containing multiple segments of twelve different materials, was installed. The sections are cooled by reheat steam, and are located just above the furnace entrance in Niles' Unit #1, a 110 MWe unit firing high sulfur Ohio coal. In November 2001 the first section was removed for thorough metallurgical evaluation after 33 months of operation. The second and third sections remain in service and the second is expected to be removed in the fall of 2003; the last is tentatively planned for the fall of 2004. This paper describes the program; its importance; the design, fabrication, installation and operation of the test system; materials utilized; experience to date; and results of the evaluation of the first section.

  18. 50 CFR 600.1004 - Accepting a request for, and determinations about initiating, a financed program.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... design, propose, and adopt a timely and reliable implementation plan as well as propose and issue timely and reliable implementation regulations and otherwise complete the program in accordance with...

  19. 50 CFR 600.1004 - Accepting a request for, and determinations about initiating, a financed program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... design, propose, and adopt a timely and reliable implementation plan as well as propose and issue timely and reliable implementation regulations and otherwise complete the program in accordance with...

  20. Questionnaire design: carry-over effects of overall acceptance question placement and pre-evaluation instructions on overall acceptance scores in central location tests.

    PubMed

    Bastian, Mauresa; Eggett, Dennis L; Jefferies, Laura K

    2015-02-01

    Question placement and usage of pre-evaluation instructions (PEI) in questionnaires for food sensory analysis may bias consumers' scores via carry-over effects. Data from consumer sensory panels previously conducted at a central location, spanning 11 years and covering a broad range of food product categories, were compiled. Overall acceptance (OA) question placement was studied with categories designated as first (the first evaluation question following demographic questions), after nongustation questions (immediately following questions that do not require panelists to taste the product), and later (following all other hedonic and just-about-right [JAR] questions, but occasionally before ranking, open-ended comments, and/or intent to purchase questions). Each panel was categorized as having or not having PEI in the questionnaire; PEI are instructions that appear immediately before the first evaluation question and show panelists all attributes they will evaluate before receiving test samples. Postpanel surveys were administered regarding the self-reported effect of PEI on panelists' evaluation experience. OA scores were analyzed and compared (1) between OA question placement categories and (2) between panels with and without PEI. For most product categories, OA scores tended to be lower when asked later in the questionnaire, suggesting evidence of a carry-over effect. Usage of PEI increased OA scores by 0.10 of a 9-point hedonic scale point, which is not practically significant. Postpanel survey data showed that presence of PEI typically improved the panelists' experience. Using PEI does not appear to introduce a meaningful carry-over effect. PMID:25604650

  1. The regulatory function of self-esteem: testing the epistemic and acceptance signaling systems.

    PubMed

    Stinson, Danu Anthony; Logel, Christine; Holmes, John G; Wood, Joanne V; Forest, Amanda L; Gaucher, Danielle; Fitzsimons, Grainné M; Kath, Jennifer

    2010-12-01

    The authors draw on sociometer theory (e.g., Leary, 2004) and self-verification theory (e.g., Swann, 1997) to propose an expanded model of the regulatory function of self-esteem. The model suggests that people not only possess an acceptance signaling system that indicates whether relational value is high or low but also possess an epistemic signaling system that indicates whether social feedback is consistent or inconsistent with chronic perceived relational value (i.e., global self-esteem). One correlational study and 5 experiments, with diverse operationalizations of social feedback, demonstrated that the epistemic signaling system responds to self-esteem consistent or inconsistent relational-value feedback with increases or deceases in epistemic certainty. Moreover, Studies 3-6 demonstrated that the acceptance and epistemic signaling systems respond uniquely to social feedback. Finally, Studies 5 and 6 provide evidence that the epistemic signaling system is part of a broader self-regulatory system: Self-esteem inconsistent feedback caused cognitive efforts to decrease the discrepancy between self-views and feedback and caused depleted self-regulatory capacity on a subsequent self-control task. PMID:20822286

  2. Department of Defense Space Test Program

    NASA Astrophysics Data System (ADS)

    Sims, Eleni M.; Zdenek, Jeffery S.

    2000-11-01

    During the 1960's, as the importance of the space environment was recognized, it became apparent that space systems technologies needed to be developed at a rapid rate. The Department of Defense (DoD) realized that before developing and deploying space systems for operational use, the needed to be tested in space. At that time no organization of funds were readily available to provide timely spaceflight for military space systems. As a result, the DoD Space Test Program (STP) was created in 1966 by a memorandum from the Director of Defense Research and Engineering (DDR&E). The purpose of this program was to provide flight opportunities for all DoD research and development activities in an economic and efficient manner. For a payload to be flown by STP it must first be sponsored by a DoD organization. The payload is then briefed through a series of service review boards until it reaches the DoD level. The DoD Space Experiment Review Board (SERB) makes the final selections and gives STP a ranked list of payloads to attempt to fly. This process happens annually, and STP flies as many payloads as funding and opportunity allow.

  3. 14 CFR 135.301 - Crewmember: Tests and checks, grace provisions, training to accepted standards.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... PERSONS ON BOARD SUCH AIRCRAFT Crewmember Testing Requirements § 135.301 Crewmember: Tests and checks... test or check in the calendar month in which it is required. (b) If a pilot being checked under this... the pilot during the course of the check. In addition to repeating the maneuvers failed, the...

  4. Optimizing surface quality of stainless alloys and using a modified ASTM G 48B procedure for acceptance testing

    SciTech Connect

    Maurer, J.R.

    1999-01-01

    The formation of high-temperature oxide scales and Cr-depleted zones on stainless alloys, such as 6% Mo superaustenitic steels, can significantly reduce their corrosion resistance. Effective methods to remove these layers and restore the surface to an optimized condition are detailed. Also, an acceptance test using a modified ASTM G 48B method at 35 C (95 F) for 72 h with a specimen having a crevice, and special corrosion criteria for failure, are described. Comparison of this test method with one using an uncreviced specimen at lower temperatures and for less time is discussed.

  5. ACCEPT: a three-dimensional finite element program for large deformation elastic-plastic-creep analysis of pressurized tubes (LWBR/AWBA Development Program)

    SciTech Connect

    Hutula, D.N.; Wiancko, B.E.

    1980-03-01

    ACCEPT is a three-dimensional finite element computer program for analysis of large-deformation elastic-plastic-creep response of Zircaloy tubes subjected to temperature, surface pressures, and axial force. A twenty-mode, tri-quadratic, isoparametric element is used along with a Zircaloy materials model. A linear time-incremental procedure with residual force correction is used to solve for the time-dependent response. The program features an algorithm which automatically chooses the time step sizes to control the accuracy and numerical stability of the solution. A contact-separation capability allows modeling of interaction of reactor fuel rod cladding with fuel pellets or external supports.

  6. Testing the Electronic Personal Health Record Acceptance Model by Nurses for Managing Their Own Health

    PubMed Central

    Trinkoff, A.M.; Storr, C.L.; Wilson, M.L.; Gurses, A.P.

    2015-01-01

    Summary Background To our knowledge, no evidence is available on health care professionals’ use of electronic personal health records (ePHRs) for their health management. We therefore focused on nurses’ personal use of ePHRs using a modified technology acceptance model. Objectives To examine (1) the psychometric properties of the ePHR acceptance model, (2) the associations of perceived usefulness, ease of use, data privacy and security protection, and perception of self as health-promoting role models to nurses’ own ePHR use, and (3) the moderating influences of age, chronic illness and medication use, and providers’ use of electronic health record (EHRs) on the associations between the ePHR acceptance constructs and ePHR use. Methods A convenience sample of registered nurses, those working in one of 12 hospitals in the Maryland and Washington, DC areas and members of the nursing informatics community (AMIA and HIMSS), were invited to respond to an anonymous online survey; 847 responded. Multiple logistic regression identified associations between the model constructs and ePHR use, and the moderating effect. Results Overall, ePHRs were used by 47%. Sufficient reliability for all scales was found. Three constructs were significantly related to nurses’ own ePHR use after adjusting for covariates: usefulness, data privacy and security protection, and health-promoting role model. Nurses with providers that used EHRs who perceived a higher level of data privacy and security protection had greater odds of ePHR use than those whose providers did not use EHRs. Older nurses with a higher self-perception as health-promoting role models had greater odds of ePHR use than younger nurses. Conclusions Nurses who use ePHRs for their personal health might promote adoption by the general public by serving as health-promoting role models. They can contribute to improvements in patient education and ePHR design, and serve as crucial resources when working with their

  7. Effects of an Oral-Sensory/Oral-Motor Stimulation/Positive Reinforcement Program on the Acceptance of Nonpreferred Foods by Youth with Physical and Multiple Disabilities

    ERIC Educational Resources Information Center

    Bailey, Rita L.; Angell, Maureen E.

    2005-01-01

    This study employed a multiple probe design to evaluate the effectiveness of a school-based lunchtime oral-sensory/oral-motor/positive reinforcement program on food acceptance behaviors of three youth with multiple disabilities. Overall dramatic gains in food acceptance behaviors of all participants indicated that trained school personnel were…

  8. Increasing the acceptability of HIV counseling and testing with three C's: convenience, confidentiality and credibility.

    PubMed

    Angotti, Nicole; Bula, Agatha; Gaydosh, Lauren; Kimchi, Eitan Zeev; Thornton, Rebecca L; Yeatman, Sara E

    2009-06-01

    Agencies engaged in humanitarian efforts to prevent the further spread of HIV have emphasized the importance of voluntary counseling and testing (VCT), and most high-prevalence countries now have facilities that offer testing free of charge. The utilization of these services is disappointingly low, however, despite high numbers reporting that they would like to be tested. Explanations of this discrepancy typically rely on responses to hypothetical questions posed in terms of psychological or social barriers; often, the explanation is that people fear learning that they are infected with a disease that they understand to be fatal and stigmatizing. Yet when we offered door-to-door rapid blood testing for HIV as part of a longitudinal study in rural Malawi, the overwhelming majority agreed to be tested and to receive their results immediately. Thus, in this paper, we ask: why are more people not getting tested? Using an explanatory research design, we find that rural Malawians are responsive to door-to-door HIV testing for the following reasons: it is convenient, confidential, and the rapid blood test is credible. Our study suggests that attention to these factors in VCT strategies may mitigate the fear of HIV testing, and ultimately increase uptake in rural African settings. PMID:19375208

  9. Tank Monitor and Control System (TMACS) Rev 11.0 Acceptance Test Review

    SciTech Connect

    HOLM, M.J.

    1999-08-25

    The purpose of this document is to describe tests performed to validate Revision 11 of the TMACS Monitor and Control System (TMACS) and verify that the software functions as intended by design. This document is intended to test the software portion of TMACS. The tests will be performed on the development system. The software to be tested is the TMACS knowledge bases (KB) and the I/O driver/services. The development system will not be talking to field equipment; instead, the field equipment is simulated using emulators or multiplexers in the lab.

  10. An Evaluation of a Television-Delivered Behavioral Weight Loss Program: Are the Ratings Acceptable?.

    ERIC Educational Resources Information Center

    Meyers, Andrew W.; And Others

    1996-01-01

    Evaluated a television-delivered behavioral weight reduction program. Overweight adults (n=71) were randomly assigned to a live-contact weight loss group videotaped for viewing by other groups, a live-contact group not videotaped, a television-delivered group that observed the videotaped weight loss sessions, or a waiting-list control group.…

  11. Perspectives on Influencing Aspects for Students' Acceptance of Multimedia Materials in Training Programs

    ERIC Educational Resources Information Center

    Córdova, Mayra Lucía González; Zermeño, Marcela Georgina Gómez; Mejía, Irma Antonia García

    2015-01-01

    This study was carried out in order to improve the understanding and learning of participants enrolled in face-to-face training programs, and to enhance their learning and retention of content through multimedia materials. A qualitative study was conducted to inquire about the perception of the participants and instructors of an Administrative…

  12. 17 CFR 38.552 - Elements of an acceptable audit trail program.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... of the order shall also be captured. (b) Transaction history database. A designated contract market's audit trail program must include an electronic transaction history database. An adequate transaction history database includes a history of all trades executed via open outcry or via entry into an...

  13. 17 CFR 38.552 - Elements of an acceptable audit trail program.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... of the order shall also be captured. (b) Transaction history database. A designated contract market's audit trail program must include an electronic transaction history database. An adequate transaction history database includes a history of all trades executed via open outcry or via entry into an...

  14. Acceptability of Online Degrees as Criteria for Admission to Graduate Programs

    ERIC Educational Resources Information Center

    DeFleur, Margaret H.; Adams, Jonathan

    2004-01-01

    This paper presents the results of a nationwide survey of deans, associate deans, and directors who make recommendations concerning the admission of applicants to graduate programs in their colleges and universities. A questionnaire was sent to a sample of academic officers in public and private institutions describing three different types of…

  15. Measuring Performance Excellence: Key Performance Indicators for Institutions Accepted into the Academic Quality Improvement Program (AQIP)

    ERIC Educational Resources Information Center

    Ballard, Paul J.

    2013-01-01

    Given growing interest in accountability and outcomes, the North Central Association's Higher Learning Commission developed a new path for accreditation, the Academic Quality Improvement Program (AQIP). The goal is to infuse continuous improvement and quality in the culture of higher education, and to blend traditional accreditation with the…

  16. Feasibility and Acceptability of a Pilot Housing Transition Program for Homeless Adults with Mental Illness and Substance Use.

    PubMed

    Gutman, Sharon A; Raphael-Greenfield, Emily I; Simon, Phyllis M

    2016-04-01

    The purpose of this study was to determine if a housing transition program was feasible and acceptable to homeless clients with mental illness and substance use histories. Ten male residents of a homeless shelter participated in the 3-week housing intervention. The intervention used a DVD format with instructional videos, graphics, and opportunities for hands-on practice of functional skills in a simulated apartment environment. Outcome measures included goal attainment scale scores (GAS), satisfaction surveys, and case manager reports. Six of the 10 participants completed the program and achieved GAS scores at a greater level than expected at baseline (T > 50). Participants reported the intervention to be engaging and enhanced their knowledge of the housing transition process. The intervention appears to have assisted the participants in the attainment of housing skills and warrants further study. PMID:26295730

  17. Feasibility and Acceptability of a Child Sexual Abuse Prevention Program for Childcare Professionals: Comparison of a Web-Based and In-Person Training

    ERIC Educational Resources Information Center

    Rheingold, Alyssa A.; Zajac, Kristyn; Patton, Meghan

    2012-01-01

    Recent prevention research has established the efficacy of some child sexual abuse prevention programs targeting adults; however, less is known about the feasibility of implementing such programs. The current study examines the feasibility and acceptability of a child sexual abuse prevention program for child care professionals provided in two…

  18. Acceptability of HIV/AIDS Counseling and Testing among Premarital Couples in China

    ERIC Educational Resources Information Center

    Wu, Zunyou; Rou, Keming; Xu, Chen; Lou, Wei; Detels, Roger

    2005-01-01

    Premarital counseling is required for couples wishing to be married in China. The counseling primarily provides information about contraception. We evaluated adding premarital HIV/AIDS counseling and voluntary HIV testing to the standard counseling. The test was offered free to one group and at the standard cost to the other. The proportion of…

  19. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid P

    SciTech Connect

    KOCH, M.R.

    2000-02-14

    This Test Plan provides a test method to dedicate the leak detection relays used on the new Pumping Instrumentation and Control (PIC) skids. The new skids are fabricated on-site. The leak detection system is a safety class system per the Authorization Basis.

  20. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid Q

    SciTech Connect

    KOCH, M.R.

    2000-02-14

    This Test Plan provides a test method to dedicate the leak detection relays used on the new Pumping Instrumentation and Control (PIC) skids. The new skids are fabricated on-site. The leak detection system is a safety class system per the Authorization Basis.