  1. Factory acceptance test results for the DIRSP projection optics

    NASA Astrophysics Data System (ADS)

    Thomas, Matthew C.; Ward, Craig S.

    2000-07-01

    The Factory Acceptance Test (FAT) results for the projection optical subsystem (POS) of US Army STIRCOM's dynamic infrared scene projector (DIRSP) are presented in this paper. DIRSP is a low background (-35 degrees Celsius) hardware-in-the- loop (HWIL), long-wave infrared (LWIR) scene projector built by Mission Research Corporation (MRC) for use by the Redstone Technical Test Center (RTTC). It has an effective emitter array size of 1632 X 672 suspended-membrane micro-resistor elements. The POS is responsible for generating this effective array size from three smaller arrays using a mosaic image combiner, adding background light from an external blackbody, and collimating the combined radiation with a 5:1 vacuum enclosed -35 degree Celsius zoom lens. The FAT results reported demonstrate good POS performance compared to the design for focal length, F/#, MTF and apparent temperature.

  2. 105K West Isolation Barrier Acceptance Test results

    SciTech Connect

    McCracken, K.J.; Irwin, J.J.

    1995-05-18

    The objective of this document is to report and interpret the findings of the isolation barrier acceptance tests performed in 105KW/100K. The tests were performed in accordance with the test plan and acceptance test procedure. The test report contains the test data. This document compares the test data against the criteria. A discussion of the leak rate analytical characterization describes how the flow characteristics flow rate will be determined using the test data from the test report. Two modes of water loss were considered; basin and/or discharge chute leakage, and evaporation. An initial test established baseline leakage data and instrumentation performance. Test 2 evaluated the sealing performance of the isolation barrier by inducing an 11 in. (27.9 cm) level differential across the barrier. The leak rate at this 11 in. (27.9 cm) level is extrapolated to the 16 ft. (4.9 m) level differential postulated in the DBE post seismic event. If the leak rate, adjusted for evaporation and basin leakage (determined from Test 1), is less than the SAR limit of 1,500 gph (5,680 lph) at a 16 ft (4.9 m) level differential, the barriers pass the acceptance test.

  3. CSI computer system/remote interface unit acceptance test results

    NASA Technical Reports Server (NTRS)

    Sparks, Dean W., Jr.

    1992-01-01

    The validation tests conducted on the Control/Structures Interaction (CSI) Computer System (CCS)/Remote Interface Unit (RIU) is discussed. The CCS/RIU consists of a commercially available, Langley Research Center (LaRC) programmed, space flight qualified computer and a flight data acquisition and filtering computer, developed at LaRC. The tests were performed in the Space Structures Research Laboratory (SSRL) and included open loop excitation, closed loop control, safing, RIU digital filtering, and RIU stand alone testing with the CSI Evolutionary Model (CEM) Phase-0 testbed. The test results indicated that the CCS/RIU system is comparable to ground based systems in performing real-time control-structure experiments.

  4. Resolve! Version 2.5: Flammable Gas Accident Analysis Tool Acceptance Test Plan and Test Results

    SciTech Connect

    LAVENDER, J.C.

    2000-10-17

    RESOLVE! Version 2 .5 is designed to quantify the risk and uncertainty of combustion accidents in double-shell tanks (DSTs) and single-shell tanks (SSTs). The purpose of the acceptance testing is to ensure that all of the options and features of the computer code run; to verify that the calculated results are consistent with each other; and to evaluate the effects of the changes to the parameter values on the frequency and consequence trends associated with flammable gas deflagrations or detonations.

  5. ATLAS ACCEPTANCE TEST

    SciTech Connect

    J.C. COCHRANE; J.V. PARKER; ET AL

    2001-06-01

    The acceptance test program for Atlas, a 23 MJ pulsed power facility for use in the Los Alamos High Energy Density Hydrodynamics program, has been completed. Completion of this program officially releases Atlas from the construction phase and readies it for experiments. Details of the acceptance test program results and of machine capabilities for experiments will be presented.

  6. DEMONSTRATION OF WELLMAN-LORD/ALLIED CHEMICAL FGD TECHNOLOGY: ACCEPTANCE TEST RESULTS

    EPA Science Inventory

    The report gives results of acceptance tests of Wellman-Lord/Allied Chemical flue gas desulfurization (FGD) technology. Process performance guarantees were met or exceeded. During the 12-day Design Load test, the plant was operated at the design condition of a boiler flue gas out...

  7. 49 CFR 180.411 - Acceptable results of tests and inspections.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Acceptable results of tests and inspections. 180.411 Section 180.411 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE... QUALIFICATION AND MAINTENANCE OF PACKAGINGS Qualification and Maintenance of Cargo Tanks § 180.411...

  8. 49 CFR 180.511 - Acceptable results of inspections and tests.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Acceptable results of inspections and tests. 180.511 Section 180.511 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE... QUALIFICATION AND MAINTENANCE OF PACKAGINGS Qualification and Maintenance of Tank Cars § 180.511...

  9. 49 CFR 180.411 - Acceptable results of tests and inspections.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Acceptable results of tests and inspections. 180.411 Section 180.411 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE... QUALIFICATION AND MAINTENANCE OF PACKAGINGS Qualification and Maintenance of Cargo Tanks § 180.411...

  10. 49 CFR 180.511 - Acceptable results of inspections and tests.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... structural defect that may initiate cracks or propagate cracks and cause failure of the tank before the next... 49 Transportation 3 2013-10-01 2013-10-01 false Acceptable results of inspections and tests. 180... AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED)...

  11. The deformable secondary mirror of VLT: final electro-mechanical and optical acceptance test results

    NASA Astrophysics Data System (ADS)

    Briguglio, Runa; Biasi, Roberto; Xompero, Marco; Riccardi, Armando; Andrighettoni, Mario; Pescoller, Dietrich; Angerer, Gerald; Gallieni, Daniele; Vernet, Elise; Kolb, Johann; Arsenault, Robin; Madec, Pierre-Yves

    2014-07-01

    The Deformable Secondary Mirror (DSM) for the VLT ended the stand-alone electro-mechanical and optical acceptance process, entering the test phase as part of the Adaptive Optics Facility (AOF) at the ESO Headquarter (Garching). The VLT-DSM currently represents the most advanced already-built large-format deformable mirror with its 1170 voice-coil actuators and its internal metrology based on co-located capacitive sensors to control the shape of the 1.12m-diameter 2mm-thick convex shell. The present paper reports the final results of the electro-mechanical and optical characterization of the DSM executed in a collaborative effort by the DSM manufacturing companies (Microgate s.r.l. and A.D.S. International s.r.l.), INAF-Osservatorio Astrofisico di Arcetri and ESO. The electro-mechanical acceptance tests have been performed in the company premises and their main purpose was the dynamical characterization of the internal control loop response and the calibration of the system data that are needed for its optimization. The optical acceptance tests have been performed at ESO (Garching) using the ASSIST optical test facility. The main purpose of the tests are the characterization of the optical shell flattening residuals, the corresponding calibration of flattening commands, the optical calibration of the capacitive sensors and the optical calibration of the mirror influence functions.

  12. Cassini RTG acceptance test results and RTG performance on Galileo and Ulysses

    SciTech Connect

    Kelly, C.E.; Klee, P.M.

    1997-06-01

    Flight acceptance testing has been completed for the RTGs to be used on the Cassini spacecraft which is scheduled for an October 6, 1997 launch to Saturn. The acceptance test program includes vibration tests, magnetic field measurements, properties (weight and c.g.) and thermal vacuum test. This paper presents The thermal vacuum test results. Three RTGs are to be used, F-2, F-6, and F-7. F-5 is tile back-up RTG, as it was for the Galileo and Ulysses missions launched in 1989 and 1990, respectively. RTG performance measured during the thermal vacuum tests carried out at die Mound Laboratory facility met all specification requirements. Beginning of mission (BOM) and end of mission (EOM) power predictions have been made based on than tests results. BOM power is predicted to be 888 watts compared to the minimum requirement of 826 watts. Degradation models predict the EOM power after 16 years is to be 640 watts compared to a minimum requirement of 596 watts. Results of small scale module tests are also showing. The modules contain couples from the qualification and flight production runs. The tests have exceeded 28,000 hours (3.2 years) and are continuing to provide increased confidence in the predicted long term performance of the Cassini RTGs. All test results indicate that the power requirements of the Cassini spacecraft will be met. BOM and EOM power margins of over five percent are predicted. Power output from telemetry for the two Galileo RTGs are shown from the 1989 launch to the recent Jupiter encounter. Comparisons of predicted, measured and required performance are shown. Telemetry data are also shown for the RTG on the Ulysses spacecraft which completed its planned mission in 1995 and is now in the extended mission.

  13. Cassini RTG acceptance test results and RTG performance on Galileo and Ulysses

    SciTech Connect

    Kelly, C.E.; Klee, P.M.

    1997-12-31

    Flight acceptance testing has been completed for the RTGs to be used on the Cassini spacecraft which is scheduled for an October 6, 1997 launch to Saturn. The acceptance test program includes vibration tests, magnetic field measurements, mass properties (weight and c.g.) and thermal vacuum test. This paper presents the thermal vacuum test results. Three RTGs are to be used, F-2, F-6, and F-7. F-5 is the backup RTG, as it was for the Galileo and Ulysses missions launched in 1989 and 1990, respectively. RTG performance measured during the thermal vacuum tests carried out at the Mound Laboratory facility met all specification requirements. Beginning of mission (BOM) and end of mission (EOM) power predictions have been made based on these tests results. BOM power is predicted to be 888 watts compared to the minimum requirement of 826 watts. Degradation models predict the EOM power after 16 years is to be 640 watts compared to a minimum requirement of 596 watts. Results of small scale module tests are also shown. The modules contain couples from the qualification and flight production runs. The tests have exceeded 28,000 hours (3.2 years) and are continuing to provide increased confidence in the predicted long term performance of the Cassini RTGs. All test results indicate that the power requirements of the Cassini spacecraft will be met. BOM and EOM power margins of over 5% are predicted. Power output from telemetry for the two Galileo RTGs are shown from the 1989 launch to the recent Jupiter encounter. Comparisons of predicted, measured and required performance are shown. Telemetry data are also shown for the RTG on the Ulysses spacecraft which completed its planned mission in 1995 and is now in the extended mission.

  14. Cassini RTG Acceptance Test Results and RTG Performance on Galileo and Ulysses

    DOE R&D Accomplishments Database

    Kelly, C. E.; Klee, P. M.

    1997-06-01

    Flight acceptance testing has been completed for the RTGs to be used on the Cassini spacecraft which is scheduled for an October 6, 1997 launch to Saturn. The acceptance test program includes vibration tests, magnetic field measurements, properties (weight and c.g.) and thermal vacuum test. This paper presents The thermal vacuum test results. Three RTGs are to be used, F 2, F 6, and F 7. F 5 is tile back up RTG, as it was for the Galileo and Ulysses missions launched in 1989 and 1990, respectively. RTG performance measured during the thermal vacuum tests carried out at die Mound Laboratory facility met all specification requirements. Beginning of mission (BOM) and end of mission (EOM) power predictions have been made based on than tests results. BOM power is predicted to be 888 watts compared to the minimum requirement of 826 watts. Degradation models predict the EOM power after 16 years is to be 640 watts compared to a minimum requirement of 596 watts. Results of small scale module tests are also showing. The modules contain couples from the qualification and flight production runs. The tests have exceeded 28,000 hours (3.2 years) and are continuing to provide increased confidence in the predicted long term performance of the Cassini RTGs. All test results indicate that the power requirements of the Cassini spacecraft will be met. BOM and EOM power margins of over five percent are predicted. Power output from telemetry for the two Galileo RTGs are shown from the 1989 launch to the recent Jupiter encounter. Comparisons of predicted, measured and required performance are shown. Telemetry data are also shown for the RTG on the Ulysses spacecraft which completed its planned mission in 1995 and is now in the extended mission.

  15. Building Energy Simulation Test for Existing Homes (BESTEST-EX): Instructions for Implementing the Test Procedure, Calibration Test Reference Results, and Example Acceptance-Range Criteria

    SciTech Connect

    Judkoff, R.; Polly, B.; Bianchi, M.; Neymark, J.; Kennedy, M.

    2011-08-01

    This publication summarizes building energy simulation test for existing homes (BESTEST-EX): instructions for implementing the test procedure, calibration tests reference results, and example acceptance-range criteria.

  16. The adaptive secondary mirror for the Large Binocular Telescope: results of acceptance laboratory test

    NASA Astrophysics Data System (ADS)

    Riccardi, A.; Xompero, M.; Zanotti, D.; Busoni, L.; Del Vecchio, C.; Salinari, P.; Ranfagni, P.; Brusa Zappellini, G.; Biasi, R.; Andrighettoni, M.; Gallieni, D.; Anaclerio, E.; Martin, H. M.; Miller, S. M.

    2008-07-01

    The first of the two Gregorian Adaptive Secondary Mirror (ASM) units for the Large Binocular Telescope (LBT) has been fully integrated and tested for laboratory acceptance. The LBT unit represents the most advanced ASM device existing in hardware. The unit has 672 electro-magnetic force actuators to change the shape of the 1.6mm-thick and 911mm-diameter Zerodur shell. The actuators control the mirror figure using the position feedback from the internal metrology provided by co-located capacitive sensors. The on-board real-time control electronics has a parallel computational power of 163Gflop/s providing not only the internal control of the unit with a 72kHz loop but also the wavefront reconstruction for the 1kHz Adaptive Optics loop. The paper describes the final configuration of the system and reports the results of the characterization and optimization process together with the results of the laboratory acceptance tests.

  17. Results of the NASA Kennedy Space Center 50-MHz Doppler Radar Wind Profiler Operational Acceptance Test

    NASA Technical Reports Server (NTRS)

    Barbre', Robert E., Jr.; Decker, Ryan K.; Leahy, Frank B.; Huddleston, Lisa

    2016-01-01

    This paper presents results of the new Kennedy Space Center (KSC) 50-MHz Doppler Radar Wind Profiler (DRWP) Operational Acceptance Test (OAT). The goal of the OAT was to verify the data quality of the new DRWP against the performance of the previous DRWP in order to use wind data derived by the new DRWP for space launch vehicle operations support at the Eastern Range. The previous DRWP was used as a situational awareness asset for mission operations to identify rapid changes in the wind environment that weather balloons cannot depict. The Marshall Space Flight Center's Natural Environments Branch assessed data from the new DRWP collected during Jan-Feb 2015 against a specified set of test criteria. Data examination verified that the DRWP provides complete profiles every five minutes from 1.8-19.5 km in vertical increments of 150 m. Analysis of 49 concurrent DRWP and balloon profiles presented root mean square wind component differences around 2.0 m/s. Evaluation of the DRWP's coherence between five-minute wind pairs found the effective vertical resolution to be Nyquist-limited at 300 m for both wind components. In addition, the sensitivity to rejecting data that do not have adequate signal was quantified. This paper documents the data, quality control procedures, methodology, and results of each analysis.

  18. Cone penetrometer acceptance test report

    SciTech Connect

    Boechler, G.N.

    1996-09-19

    This Acceptance Test Report (ATR) documents the results of acceptance test procedure WHC-SD-WM-ATR-151. Included in this report is a summary of the tests, the results and issues, the signature and sign- off ATP pages, and a summarized table of the specification vs. ATP section that satisfied the specification.

  19. UGV acceptance testing

    NASA Astrophysics Data System (ADS)

    Kramer, Jeffrey A.; Murphy, Robin R.

    2006-05-01

    With over 100 models of unmanned vehicles now available for military and civilian safety, security or rescue applications, it is important to for agencies to establish acceptance testing. However, there appears to be no general guidelines for what constitutes a reasonable acceptance test. This paper describes i) a preliminary method for acceptance testing by a customer of the mechanical and electrical components of an unmanned ground vehicle system, ii) how it has been applied to a man-packable micro-robot, and iii) discusses the value of testing both to ensure that the customer has a workable system and to improve design. The test method automated the operation of the robot to repeatedly exercise all aspects and combinations of components on the robot for 6 hours. The acceptance testing process uncovered many failures consistent with those shown to occur in the field, showing that testing by the user does predict failures. The process also demonstrated that the testing by the manufacturer can provide important design data that can be used to identify, diagnose, and prevent long-term problems. Also, the structured testing environment showed that sensor systems can be used to predict errors and changes in performance, as well as uncovering unmodeled behavior in subsystems.

  20. Department of Defense picture archiving and communication system acceptance testing: results and identification of problem components.

    PubMed

    Allison, Scott A; Sweet, Clifford F; Beall, Douglas P; Lewis, Thomas E; Monroe, Thomas

    2005-09-01

    The PACS implementation process is complicated requiring a tremendous amount of time, resources, and planning. The Department of Defense (DOD) has significant experience in developing and refining PACS acceptance testing (AT) protocols that assure contract compliance, clinical safety, and functionality. The DOD's AT experience under the initial Medical Diagnostic Imaging Support System contract led to the current Digital Imaging Network-Picture Archiving and Communications Systems (DIN-PACS) contract AT protocol. To identify the most common system and component deficiencies under the current DIN-PACS AT protocol, 14 tri-service sites were evaluated during 1998-2000. Sixteen system deficiency citations with 154 separate types of limitations were noted with problems involving the workstation, interfaces, and the Radiology Information System comprising more than 50% of the citations. Larger PACS deployments were associated with a higher number of deficiencies. The most commonly cited systems deficiencies were among the most expensive components of the PACS. PMID:15924273

  1. 49 CFR 180.511 - Acceptable results of inspections and tests.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... all product piping, fittings and closures show no indication of leakage. (g) Hydrostatic test. A Class 107 tank car or a riveted tank car successfully passes the hydrostatic test when it shows no leakage... before the next inspection and test interval. (b) Structural integrity inspection and test. A tank...

  2. Results of the Updated NASA Kennedy Space Center 50-MHz Doppler Radar Wind Profiler Operational Acceptance Test

    NASA Technical Reports Server (NTRS)

    Barbre', Robert E., Jr.; Deker, Ryan K.; Leahy, Frank B.; Huddleston, Lisa

    2016-01-01

    We present here the methodology and results of the Operational Acceptance Test (OAT) performed on the new Kennedy Space Center (KSC) 50-MHz Doppler Radar Wind Profiler (DRWP). On day-of-launch (DOL), space launch vehicle operators have used data from the DRWP to invalidate winds in prelaunch loads and trajectory assessments due to the DRWP's capability to quickly identify changes in the wind profile within a rapidly-changing wind environment. The previous DRWP has been replaced with a completely new system, which needs to undergo certification testing before being accepted for use in range operations. The new DRWP replaces the previous three-beam system made of coaxial cables and a copper wire ground plane with a four-beam system that uses Yagi antennae with enhanced beam steering capability. In addition, the new system contains updated user interface software while maintaining the same general capability as the previous system. The new DRWP continues to use the Median Filter First Guess (MFFG) algorithm to generate a wind profile from Doppler spectra at each range gate. DeTect (2015) contains further details on the upgrade. The OAT is a short-term test designed so that end users can utilize the new DRWP in a similar manner to the previous DRWP during mission operations at the Eastern Range in the midst of a long-term certification process. This paper describes the Marshall Space Flight Center Natural Environments Branch's (MSFC NE's) analyses to verify the quality and accuracy of the DRWP's meteorological data output as compared to the previous DRWP. Ultimately, each launch vehicle program has the responsibility to certify the system for their own use.

  3. L-286 Acceptance Test Record

    SciTech Connect

    HARMON, B.C.

    2000-01-14

    This document provides a detailed account of how the acceptance testing was conducted for Project L-286, ''200E Area Sanitary Water Plant Effluent Stream Reduction''. The testing of the L-286 instrumentation system was conducted under the direct supervision

  4. Nitrogen trailer acceptance test report

    SciTech Connect

    Kostelnik, A.J.

    1996-02-12

    This Acceptance Test Report documents compliance with the requirements of specification WHC-S-0249. The equipment was tested according to WHC-SD-WM-ATP-108 Rev.0. The equipment being tested is a portable contained nitrogen supply. The test was conducted at Norco`s facility.

  5. From requirements to acceptance tests

    NASA Technical Reports Server (NTRS)

    Baize, Lionel; Pasquier, Helene

    1993-01-01

    From user requirements definition to accepted software system, the software project management wants to be sure that the system will meet the requirements. For the development of a telecommunication satellites Control Centre, C.N.E.S. has used new rules to make the use of tracing matrix easier. From Requirements to Acceptance Tests, each item of a document must have an identifier. A unique matrix traces the system and allows the tracking of the consequences of a change in the requirements. A tool has been developed, to import documents into a relational data base. Each record of the data base corresponds to an item of a document, the access key is the item identifier. Tracing matrix is also processed, providing automatically links between the different documents. It enables the reading on the same screen of traced items. For example one can read simultaneously the User Requirements items, the corresponding Software Requirements items and the Acceptance Tests.

  6. Acceptance Test Plan for ANSYS Software

    SciTech Connect

    CREA, B.A.

    2000-10-25

    This plan governs the acceptance testing of the ANSYS software (Full Mechanical Release 5.5) for use on Project Word Management Contract (PHMC) computer systems (either UNIX or Microsoft Windows/NT). There are two phases to the acceptance testing covered by this test plan: program execution in accordance with the guidance provided in installation manuals; and ensuring results of the execution are consistent with the expected physical behavior of the system being modeled.

  7. Gas characterization system software acceptance test report

    SciTech Connect

    Vo, C.V.

    1996-03-28

    This document details the results of software acceptance testing of gas characterization systems. The gas characterization systems will be used to monitor the vapor spaces of waste tanks known to contain measurable concentrations of flammable gases.

  8. Acceptance Test Report for 241-U compressed air system

    SciTech Connect

    Freeman, R.D.

    1994-10-20

    This Acceptance Test Report (ATR) documents the results of acceptance testing of a newly upgraded compressed air system at 241-U Farm. The system was installed and the test successfully performed under work package 2W-92-01027.

  9. Retained gas sampler system acceptance test report

    SciTech Connect

    Cannon, N.S., Westinghouse Hanford

    1996-07-18

    Acceptance test results for the Retained Gas Sampler System (RGSS) obtained in the 306E laboratory are reported. The RGSS will be utilized to retrieve and analyze samples from the Hanford flammable gas watch-list tanks to determine the quantity and chemistry of gases confined within the waste.

  10. Emperical Tests of Acceptance Sampling Plans

    NASA Technical Reports Server (NTRS)

    White, K. Preston, Jr.; Johnson, Kenneth L.

    2012-01-01

    Acceptance sampling is a quality control procedure applied as an alternative to 100% inspection. A random sample of items is drawn from a lot to determine the fraction of items which have a required quality characteristic. Both the number of items to be inspected and the criterion for determining conformance of the lot to the requirement are given by an appropriate sampling plan with specified risks of Type I and Type II sampling errors. In this paper, we present the results of empirical tests of the accuracy of selected sampling plans reported in the literature. These plans are for measureable quality characteristics which are known have either binomial, exponential, normal, gamma, Weibull, inverse Gaussian, or Poisson distributions. In the main, results support the accepted wisdom that variables acceptance plans are superior to attributes (binomial) acceptance plans, in the sense that these provide comparable protection against risks at reduced sampling cost. For the Gaussian and Weibull plans, however, there are ranges of the shape parameters for which the required sample sizes are in fact larger than the corresponding attributes plans, dramatically so for instances of large skew. Tests further confirm that the published inverse-Gaussian (IG) plan is flawed, as reported by White and Johnson (2011).

  11. Nevada Test Site Waste Acceptance Criteria (NTSWAC)

    SciTech Connect

    NNSA /NSO Waste Management Project

    2008-06-01

    This document establishes the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, Nevada Test Site Waste Acceptance Criteria (NTSWAC). The NTSWAC provides the requirements, terms, and conditions under which the Nevada Test Site will accept low-level radioactive (LLW) and LLW Mixed Waste (MW) for disposal.

  12. Nevada Test Site Waste Acceptance Criteria

    SciTech Connect

    U.S. Department of Energy, Nevada Operations Office, Waste Acceptance Criteria

    1999-05-01

    This document provides the requirements, terms, and conditions under which the Nevada Test Site will accept low-level radioactive and mixed waste for disposal; and transuranic and transuranic mixed waste for interim storage at the Nevada Test Site.

  13. Site acceptance test, W-030 MICON system

    SciTech Connect

    Hill, L.F., Westinghouse Hanford

    1996-06-10

    Monitoring and control of the W-030 ventilation upgrade is provided by a distributed control system (DCS) furnished by MICON Corporation. After shipment to the Hanford Site, the site acceptance test (SAT) for this system was conducted in a laboratory environment over a six month period, involving four distinct phases and numerous hardware and software modifications required to correct test exceptions. The final results is a system which is not fully compliant with procurement specifications but is determined to meet minimum Project W-030 safety and functional requirements. A negotiated settlement was reached with the supplier to establish a `path forward` for system implementation. This report documents the `as-run` status of the SAT. The SAT was completed in August of 1995. It was later followed by comprehensive acceptance testing of the W-030 control-logic configuration software; results are documented in WHC-SD-W030-ATR-011. Further testing is reported as part of process system startup operational testing, performed after the MICON installation.

  14. Nitrogen chiller acceptance test procedure

    SciTech Connect

    Kostelnik, A.J.

    1995-03-07

    This document includes the inspection and testing requirements for the Nitrogen Chiller unit. The Chiller will support the Rotary Mode core Sampling System during the summer. The Chiller cools the Nitrogen Purge Gas that is used when drilling in tank wastes to cool the drill bit.

  15. Generator acceptance test and inspection report

    SciTech Connect

    Johns, B.R.

    1997-07-24

    This Acceptance Test Report(ATR) is the completed testing and inspection of the new portable generator. The testing and inspection is to verify that the generator provided by the vendor meets the requirements of specification WHC-S-0252, Revision 2. Attached is various other documentation to support the inspection and testing.

  16. Gas characterization system software acceptance test procedure

    SciTech Connect

    Vo, C.V.

    1996-02-27

    This document details the Software Acceptance Testing of gas characterization systems. The gas characterization systems will be used to monitor the vapor spaces of waste tanks known to contain measurable concentrations of flammable gases.

  17. NEVADA TEST SITE WASTE ACCEPTANCE CRITERIA

    SciTech Connect

    U.S. DEPARTMENT OF ENERGY, NATIONAL NUCLEAR SECURITY ADMINISTRATION, NEVADA SITE OFFICE

    2005-07-01

    This document establishes the U. S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) waste acceptance criteria (WAC). The WAC provides the requirements, terms, and conditions under which the Nevada Test Site will accept low-level radioactive and mixed waste for disposal. Mixed waste generated within the State of Nevada by NNSA/NSO activities is accepted for disposal. It includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the Nevada Test Site Area 3 and Area 5 Radioactive Waste Management Site for storage or disposal.

  18. Acceptability of a Community-Based Outreach HIV-Testing Intervention Using Oral Fluid Collection Devices and Web-Based HIV Test Result Collection Among Sub-Saharan African Migrants: A Mixed-Method Study

    PubMed Central

    Manirankunda, Lazare; Platteau, Tom; Albers, Laura; Fransen, Katrien; Vermoesen, Tine; Namanya, Fiona; Nöstlinger, Christiana

    2016-01-01

    Background Late human immunodeficiency virus (HIV) diagnosis is common among sub-Saharan African migrants. To address their barriers to HIV testing uptake and improve timely HIV diagnoses and linkage to care, the outreach HIV testing intervention, “swab2know,” was developed. It combined a community-based approach with innovative testing methods: oral fluid self-sampling and the choice between Web-based HIV test result collections using a secured website or post-test counseling at a sexual health clinic. The sessions included an informational speech delivered by a physician of sub-Saharan African origin and testimonies by community members living with HIV. Objectives The objectives of this study were to evaluate the intervention’s acceptability among sub-Saharan African migrants and its potential to reach subgroups at higher risk for HIV infection and to identify facilitators and barriers for HIV testing uptake. Methods This mixed-method study combined qualitative (participant observations and informal interviews with testers and nontesters) and quantitative data (paper–pencil survey, laboratory data, and result collection files). Data were analyzed using a content analytical approach for qualitative and univariate analysis for quantitative data. Results A total of 10 testing sessions were organized in sub-Saharan African migrant community venues in the city of Antwerp, Belgium, between December 2012 and June 2013. Overall, 18.2% of all people present (N=780) underwent HIV testing; 29.8% of them tested for HIV for the first time, 22.3% did not have a general practitioner, and 21.5% reported 2 or more sexual partners (last 3 months). Overall, 56.3% of participants chose to collect their HIV test results via the protected website. In total, 78.9% collected their results. The qualitative analysis of 137 participant observation field notes showed that personal needs and Internet literacy determined the choice of result collection method. Generally, the oral

  19. Breathing air trailer acceptance test report

    SciTech Connect

    Kostelnik, A.J.

    1996-02-12

    This Acceptance Test Report documents compliance with the requirements of specification WHC-S-0251, Rev.0 and ECNs 613530 and 606113. The equipment was tested according to WHC-SD-WM-ATP-104. The equipment tested is a Breathing Air Supply Trailer purchased as a design and fabrication procurement activity. The ATP was written by the Seller and was performed by the Seller with representatives of the Westinghouse Hanford Company witnessing portions of the test at the Seller`s location.

  20. Induction graphitizing furnace acceptance test report

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The induction furnace was designed to provide the controlled temperature and environment required for the post-cure, carbonization and graphitization processes for the fabrication of a fibrous graphite NERVA nozzle extension. The acceptance testing required six tests and a total operating time of 298 hrs. Low temperature mode operations, 120 to 850 C, were completed in one test run. High temperature mode operations, 120 to 2750 C, were completed during five tests.

  1. Void fraction instrument acceptance test procedure

    SciTech Connect

    Pearce, K.L.

    1994-09-15

    This acceptance test procedure (ATP) was written to test the void fraction instrument (VFI) and verify that the unit is ready for field service. The procedure verifies that the mechanical and electrical features (not specifically addressed in the software ATP) and software alarms are operating as designed.

  2. W-087 Acceptance test procedure. Revision 1

    SciTech Connect

    Joshi, A.W.

    1997-06-10

    This Acceptance Test Procedure/Operational Test Procedure (ATP/OTP) has been prepared to demonstrate that the Electrical/Instrumentation and Mechanical systems function as required by project criteria and to verify proper operation of the integrated system including the interlocks.

  3. Acceptance test report: Backup power system

    SciTech Connect

    Cole, D.B.

    1996-01-26

    Acceptance Test Report for construction functional testing of Project W-030 Backup Power System. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. Backup power includes a single 125 KW diesel generator, three 10-kva uninterruptible power supply units, and all necessary control.

  4. Acceptance test report 2721-Z upgrades

    SciTech Connect

    Keck, R.D.

    1998-02-03

    This test procedure provides instructions for acceptance testing of modifications to the 2721-Z diesel-generator system made by Project C-189. The modifications include (1) replacing the generator NUMA-LOGIC controller with connection to the PFP distributed control system (DCS), (2) replacing ATSI with a breaker switching scheme for 2736-ZB backup power and (3) providing a method for generator load and system testing.

  5. Acceptance test procedure for High Pressure Water Jet System

    SciTech Connect

    Crystal, J.B.

    1995-05-30

    The overall objective of the acceptance test is to demonstrate a combined system. This includes associated tools and equipment necessary to perform cleaning in the 105 K East Basin (KE) for achieving optimum reduction in the level of contamination/dose rate on canisters prior to removal from the KE Basin and subsequent packaging for disposal. Acceptance tests shall include necessary hardware to achieve acceptance of the cleaning phase of canisters. This acceptance test procedure will define the acceptance testing criteria of the high pressure water jet cleaning fixture. The focus of this procedure will be to provide guidelines and instructions to control, evaluate and document the acceptance testing for cleaning effectiveness and method(s) of removing the contaminated surface layer from the canister presently identified in KE Basin. Additionally, the desired result of the acceptance test will be to deliver to K Basins a thoroughly tested and proven system for underwater decontamination and dose reduction. This report discusses the acceptance test procedure for the High Pressure Water Jet.

  6. Nevada Test Site Waste Acceptance Criteria

    SciTech Connect

    U. S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2005-10-01

    This document establishes the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) waste acceptance criteria (WAC). The WAC provides the requirements, terms, and conditions under which the Nevada Test Site (NTS) will accept low-level radioactive (LLW) and mixed waste (MW) for disposal. It includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the NTS Area 3 and Area 5 Radioactive Waste Management Complex (RWMC) for storage or disposal.

  7. Breathing air trailer acceptance test procedure

    SciTech Connect

    Kostelnik, A.J.

    1994-09-14

    This Acceptance Test Procedure (ATP) will document compliance with the requirements of WHC-S-0251 Rev. 0 and ECNs 613530 and 606113. The equipment being tested is a Breathing Air Supply Trailer purchased as a Design and Fabrication procurement activity for use in the core sampling program. The ATP was written by the Seller and will be performed by the Seller with representatives of the Westinghouse Hanford Company witnessing the test at the Seller`s location. This test procedure is to verify that the American Bristol Industries, Inc., Model 5014-0001 low pressure Mobile Breathing Air Trailer, meets or exceeds the requirements of the Westinghouse Hanford specification.

  8. MCO Engineering Test Report Fuel Basket Handling Grapple Acceptance Test

    SciTech Connect

    CHENAULT, D.M.

    2000-01-06

    Acceptance testing of the production SNF Fuel Basket lift grapples to the required 150 percent maximum lift load is documented herein. The report shows the results affirming the proof test passage. The primary objective of this test was to confirm the load rating of the grapple per applicable requirements of ANSI 14 6 American National Standard For Radioactive Materials Special Lifting Devices for Shipping Containers Weighing 10,000 pounds (4500kg) or More. The above Standard requires a load test of 150% of the design load which must be held for a minimum of 10 minutes followed by a Liquid Penetrant or Magnetic Particle examination of critical areas and welds in accordance with the ANSI/ASME Boiler and Pressure Vessel Code 1989 Section 111 Division 1 section NF 5350.

  9. W-026, acceptance test report manipulator system

    SciTech Connect

    Watson, T.L.

    1997-04-15

    The purpose of the WRAP Manipulator System Acceptance Test Plan (ATP) is to verify that the 4 glovebox sets of WRAP manipulator components, including rail/carriage, slave arm, master controller and auxiliary equipment, meets the requirements of the functional segments of 14590 specification. The demonstration of performance elements of the ATP are performed as a part of the Assembly specifications. Manipulator integration is integrated in the performance testing of the gloveboxes. Each requirement of the Assembly specification will be carried out in conjunction with glovebox performance tests.

  10. Acceptance test report for project C-157 ``T-Plant electrical upgrade``

    SciTech Connect

    Jeppson, L.A.

    1997-08-05

    This Acceptance Test Report (ATR) documents for record purposes the field results, acceptance, and approvals of the completed acceptance test per WHC-SD-Cl57-ATP-001, Rev. 0, ``Acceptance Test Proceedure for Project C-157 `T Plant Electrical Upgrade``` The test was completed and approved without any problems or exceptions.

  11. Nevada test site waste acceptance criteria

    SciTech Connect

    1996-09-01

    This document provides the requirements, terms, and conditions under which the Nevada Test Site (NTS) will accept low-level radioactive and mixed waste for disposal; and transuranic and transuranic mixed waste for interim storage at the NTS. Review each section of this document. This document is not intended to include all of the requirements; rather, it is meant as a guide toward meeting the regulations. All references in this document should be observed to avoid omission of requirements on which acceptance or rejection of waste will be based. The Department of Energy/Nevada Operations Office (DOE/NV) and support contractors are available to assist you in understanding or interpreting this document.

  12. Payload test philosophy. [JPL views on qualification/acceptance testing

    NASA Technical Reports Server (NTRS)

    Gindorf, T.

    1979-01-01

    The general philosophy of how JPL views payload qualification/acceptance testing for programs that are done either in-house or by contractors is described. Particular attention is given to mission risk classifications, preliminary critical design reviews, environmental design requirements, the thermal and dynamics development tests, and the flight spacecraft system test.

  13. Acceptance testing prone stereotactic breast biopsy units.

    PubMed

    Kimme-Smith, C; Solberg, T

    1994-07-01

    When the Mammography Quality Standards Act becomes law in October, 1994, stereotactic breast biopsy units may require yearly physicist calibration. Upright stereotactic units can be easily tested using conventional mammography procedures and a gelatin phantom containing simulated calcifications, but prone units are difficult to assess because of the under-table tube configuration. The two current manufacturers of these units have made different design decisions which affect each unit's calibration. There are a number of important distinctions between screening and prone biopsy units. For the two currently available prone units, a pronounced heel effect makes ion chamber position critical. Focal spot measurements are particularly difficult on one unit because there is no light field. The fixed grid on the other unit must be tested with a flood film. Physicists who inspect these units before their clinical use should be aware of variations needed by this equipment for specific acceptance tests. PMID:7968854

  14. DUAL ALKALI ACCEPTANCE TEST AT LOUISVILLE GAS AND ELECTRIC COMPANY; VOLUME I. ACCEPTANCE TEST AND APPENDICES A-C

    EPA Science Inventory

    The report gives results of the completed acceptance test series run on the dual alkali system serving Louisville Gas and Electric Company's Cane Run Unit 6 boiler. This volume contains the process description and a discussion of the test results, operating history, and performan...

  15. Acceptance test report MICON software exhaust fan control

    SciTech Connect

    Keck, R.D.

    1998-06-12

    This test procedure specifies instructions for acceptance testing of software for exhaust fan control under Project ESPT (Energy Savings Performance Contract). The software controls the operation of two emergency exhaust fans when there is a power failure. This report details the results of acceptance testing for the MICON software upgrades. One of the modifications is that only one of the emergency fans will operate at all times. If the operating fan shuts off or fails, the other fan will start and the operating fan will be stopped.

  16. Acceptance test report for portable exhauster POR-007/Skid E

    SciTech Connect

    Kriskovich, J.R.

    1998-07-24

    This document describes Acceptance Testing performed on Portable Exhauster POR-007/Skid E. It includes measurements of bearing vibration levels, pressure decay testing, programmable logic controller interlocks, high vacuum, flow and pressure control functional testing. The purpose of Acceptance testing documented by this report was to demonstrate compliance of the exhausters with the performance criteria established within HNF-0490, Rev. 1 following a repair and upgrade effort at Hanford. In addition, data obtained during this testing is required for the resolution of outstanding Non-conformance Reports (NCR), and finally, to demonstrate the functionality of the associated software for the pressure control and high vacuum exhauster operating modes provided for by W-320. Additional testing not required by the ATP was also performed to assist in the disposition and close out of receiving inspection report and for application design information (system curve). Results of this testing are also captured within this document.

  17. 46 CFR 164.023-11 - Acceptance tests.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Acceptance tests. 164.023-11 Section 164.023-11 Shipping...: SPECIFICATIONS AND APPROVAL MATERIALS Thread for Personal Flotation Devices § 164.023-11 Acceptance tests. (a... submitted for acceptance. (b) Identification testing. Manufacturers shall ensure that the...

  18. 46 CFR 164.023-11 - Acceptance tests.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 6 2011-10-01 2011-10-01 false Acceptance tests. 164.023-11 Section 164.023-11 Shipping...: SPECIFICATIONS AND APPROVAL MATERIALS Thread for Personal Flotation Devices § 164.023-11 Acceptance tests. (a... submitted for acceptance. (b) Identification testing. Manufacturers shall ensure that the...

  19. Acceptance test procedure for shuttle actuators simulator (elevon subsystem)

    NASA Technical Reports Server (NTRS)

    Barr, J.

    1976-01-01

    The acceptance test procedure is described for the Lockheed Electronics Elevon Servoactuator Simulator to be used in the Shuttle Avionics Integration Laboratory (SAIL). The intent of this acceptance test procedure is to comply with the technical Shuttle Actuators Simulator Requirements. Acceptance tests will be performed on each Elevon Servoactuator Simulator.

  20. SEP BIMOD variable conductance heat pipes acceptance and characterization tests

    NASA Technical Reports Server (NTRS)

    Hemminger, J. A.

    1981-01-01

    A series of six heat pipes, similar in design to those flown on the Comunications Technology Satellite Hermes, for use in a prototype Solar Electric Propulsion BIMOD thrust module are evaluated. The results of acceptance and characterization tests performed on the heat pipe subassemble are reported. The performance of all the heat pipes met, or exceeded, design specifications.

  1. SEP BIMOD variable conductance heat pipes acceptance and characterization tests

    NASA Astrophysics Data System (ADS)

    Hemminger, J. A.

    1981-08-01

    A series of six heat pipes, similar in design to those flown on the Comunications Technology Satellite Hermes, for use in a prototype Solar Electric Propulsion BIMOD thrust module are evaluated. The results of acceptance and characterization tests performed on the heat pipe subassemble are reported. The performance of all the heat pipes met, or exceeded, design specifications.

  2. Electromagnetic induction moisture measurement system acceptance test report

    SciTech Connect

    Vargo, G.J.

    1996-10-07

    This document presents the results of the acceptance test for the hardware and software that was developed to operate the ElectroMagnetic Induction (EMI) moisture measurement system to be used for in-tank moisture measurements. This document satisfies EP 4.1, ``Design Verification Requirements``.

  3. Acceptance test report MICON software exhaust fan control modifications

    SciTech Connect

    SILVAN, G.R.

    1999-05-20

    This report documents the results the acceptance test HNF-4108 which verifies the MICON program changes for the new automatic transfer switch ATS-2 alarms, the Closed Loop Cooling isolator status, the CB-3 position alarm, the alarms for the new emergency fan damper backup air compressor, and the generator sequencer logic.

  4. Standard-D hydrogen monitoring system acceptance test

    SciTech Connect

    Lott, D.T., Westinghouse Hanford

    1996-05-24

    This document details the results of the field Acceptance Testing of the Standard-D Hydrogen Monitoring System on the waste tank exhaust stacks in 241-AW and 241-AN tank farm. The monitors will be used to measure hydrogen and ammonia from the exhaust stacks.

  5. Automatically generated acceptance test: A software reliability experiment

    NASA Technical Reports Server (NTRS)

    Protzel, Peter W.

    1988-01-01

    This study presents results of a software reliability experiment investigating the feasibility of a new error detection method. The method can be used as an acceptance test and is solely based on empirical data about the behavior of internal states of a program. The experimental design uses the existing environment of a multi-version experiment previously conducted at the NASA Langley Research Center, in which the launch interceptor problem is used as a model. This allows the controlled experimental investigation of versions with well-known single and multiple faults, and the availability of an oracle permits the determination of the error detection performance of the test. Fault interaction phenomena are observed that have an amplifying effect on the number of error occurrences. Preliminary results indicate that all faults examined so far are detected by the acceptance test. This shows promise for further investigations, and for the employment of this test method on other applications.

  6. 46 CFR 164.023-11 - Acceptance tests.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 6 2014-10-01 2014-10-01 false Acceptance tests. 164.023-11 Section 164.023-11 Shipping...: SPECIFICATIONS AND APPROVAL MATERIALS Thread for Personal Flotation Devices § 164.023-11 Acceptance tests. (a) Performance testing. Manufacturers shall ensure that the performance tests described in § 164.023-7 (a) or...

  7. Test Report for Acceptance Test Procedure for Pumping and Instrumentation Control Skid ''K''

    SciTech Connect

    JOHNS, B.R.

    1999-10-28

    This is a Test Report for Acceptance Test Procedure (ATP) HNF-4276. This test report provides the results of the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''K''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  8. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid N

    SciTech Connect

    KOCH, M.R.

    2000-02-03

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5489. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''N''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  9. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid L

    SciTech Connect

    KOCH, M.R.

    1999-11-09

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5055. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''L''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  10. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid M

    SciTech Connect

    KOCH, M.R.

    1999-12-13

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5073. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''M''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  11. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid P

    SciTech Connect

    KOCH, M.R.

    2000-03-29

    This Acceptance Test Report (ATR) provides the test results for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''P''. The ATR summaries the results and provides a copy of the ATP and inspections in the Appendix.

  12. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid Q

    SciTech Connect

    KOCH, M.R.

    2000-05-11

    This Acceptance Test Report (ATR) provides the test results for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''Q''. The ATR summaries the results and provides a copy of the ATP and inspections in the Appendix.

  13. Surface moisture measurement system hardware acceptance test report

    SciTech Connect

    Ritter, G.A., Westinghouse Hanford

    1996-05-28

    This document summarizes the results of the hardware acceptance test for the Surface Moisture Measurement System (SMMS). This test verified that the mechanical and electrical features of the SMMS functioned as designed and that the unit is ready for field service. The bulk of hardware testing was performed at the 306E Facility in the 300 Area and the Fuels and Materials Examination Facility in the 400 Area. The SMMS was developed primarily in support of Tank Waste Remediation System (TWRS) Safety Programs for moisture measurement in organic and ferrocyanide watch list tanks.

  14. Development of an acceptance test for solar energy systems

    NASA Astrophysics Data System (ADS)

    Joncich, D. M.; Johnson, D. L.

    1981-06-01

    This report describes the development and field evaluation of a short-duration procedure and an instrumentation package for testing whether a newly installed solar energy system is performing to design specifications. The U.S. Army Construction Engineering Research Laboratory: (1) defined a general solar system schematic and identified its major components; (2) developed test procedures for determining the thermal performance of these components; (3) bought and programmed equipment to perform the prescribed component test and to produce the test data; (4) subjected the acceptance test concept and instrumentation package to a field evaluation at a newly installed Army solar energy system; and (5) incorporated the results of the field evaluation as modifications to the solar acceptance test. This report concludes that a simple, quantitative test of short duration can determine whether a newly installed solar system is operating as specified. The results of the research have revealed the potential for performing such a test with low-cost metering installed at the time of building construction.

  15. Acceptance Test Report for the 241-AZ-101 Ultrasonic Interface Level Analyzer

    SciTech Connect

    ANDREWS, J.E.

    2000-01-27

    This document comprises the Acceptance Test Report for the 241-AZ-101 Ultrasonic Interface Level Analyzer. This document presents the results of Acceptance Testing of the 241-AZ-101 Ultrasonic Interface Level Analyzers (URSILLAs). Testing of the URSILLAs was performed in accordance with ATP-260-001, ''URSILLA Pre-installation Acceptance Test Procedure''. The objective of the testing was to verify that all equipment and components function in accordance with design specifications and original equipment manufacturer's specifications.

  16. Nevada Test Site Waste Acceptance Criteria, December 2000

    SciTech Connect

    2000-12-01

    This document establishes the US Department of Energy, Nevada Operations Office waste acceptance criteria. The waste acceptance criteria provides the requirements, terms, and conditions under which the Nevada Test Site will accept low-level radioactive waste and mixed waste for disposal. It includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the Nevada Test Site Area 3 and Area 5 Radioactive Waste Management Sites for storage or disposal.

  17. 242A Distributed Control System Year 2000 Acceptance Test Report

    SciTech Connect

    TEATS, M.C.

    1999-08-31

    This report documents acceptance test results for the 242-A Evaporator distributive control system upgrade to D/3 version 9.0-2 for year 2000 compliance. This report documents the test results obtained by acceptance testing as directed by procedure HNF-2695. This verification procedure will document the initial testing and evaluation of the potential 242-A Distributed Control System (DCS) operating difficulties across the year 2000 boundary and the calendar adjustments needed for the leap year. Baseline system performance data will be recorded using current, as-is operating system software. Data will also be collected for operating system software that has been modified to correct year 2000 problems. This verification procedure is intended to be generic such that it may be performed on any D/3{trademark} (GSE Process Solutions, Inc.) distributed control system that runs with the VMSTM (Digital Equipment Corporation) operating system. This test may be run on simulation or production systems depending upon facility status. On production systems, DCS outages will occur nine times throughout performance of the test. These outages are expected to last about 10 minutes each.

  18. 46 CFR 164.013-5 - Acceptance tests.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 6 2014-10-01 2014-10-01 false Acceptance tests. 164.013-5 Section 164.013-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS...) § 164.013-5 Acceptance tests. Manufacturers shall ensure that the performance and identification...

  19. Acceptance Test Procedure for New Pumping Instrumentation & Control Skid V

    SciTech Connect

    KOCH, M.R.

    2000-08-14

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designated as ''V''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  20. Acceptance test report for portable exhauster POR-008/Skid F

    SciTech Connect

    Kriskovich, J.R.

    1998-07-24

    Portable Exhauster POR-008 was procured via HNF-0490, Specification for a Portable Exhausted System for Waste Tank Ventilation. Prior to taking ownership, acceptance testing was performed at the vendors. However at the conclusion of testing a number of issues remained that required resolution before the exhausters could be used by Project W-320. The purpose of acceptance testing documented by this report was to demonstrate compliance of the exhausters with the performance criteria established within HNF-O49O, Rev. 1 following a repair and upgrade effort at Hanford. In addition, data obtained during this testing is required for the resolution of outstanding Non-conformance Reports (NCR), and finally, to demonstrate the functionality of the associated software for the pressure control and high vacuum exhauster operating modes provided for by W-320. Additional testing not required by the ATP was also performed to assist in the disposition and close out of receiving inspection report and for application design information (system curve). Results of this testing are also captured within this document.

  1. Organic Separation Test Results

    SciTech Connect

    Russell, Renee L.; Rinehart, Donald E.; Peterson, Reid A.

    2014-09-22

    Separable organics have been defined as “those organic compounds of very limited solubility in the bulk waste and that can form a separate liquid phase or layer” (Smalley and Nguyen 2013), and result from three main solvent extraction processes: U Plant Uranium Recovery Process, B Plant Waste Fractionation Process, and Plutonium Uranium Extraction (PUREX) Process. The primary organic solvents associated with tank solids are TBP, D2EHPA, and NPH. There is concern that, while this organic material is bound to the sludge particles as it is stored in the tanks, waste feed delivery activities, specifically transfer pump and mixer pump operations, could cause the organics to form a separated layer in the tank farms feed tank. Therefore, Washington River Protection Solutions (WRPS) is experimentally evaluating the potential of organic solvents separating from the tank solids (sludge) during waste feed delivery activities, specifically the waste mixing and transfer processes. Given the Hanford Tank Waste Treatment and Immobilization Plant (WTP) waste acceptance criteria per the Waste Feed Acceptance Criteria document (24590-WTP-RPT-MGT-11-014) that there is to be “no visible layer” of separable organics in the waste feed, this would result in the batch being unacceptable to transfer to WTP. This study is of particular importance to WRPS because of these WTP requirements.

  2. Operator coil monitoring Acceptance Test Procedure

    SciTech Connect

    Erhart, M.F.

    1995-05-16

    The readiness of the Data Acquisition and Control System (DACS) to provide monitoring and control of the Programmable Logic Controller (PLC) abort coils from the Master and RSS stations will be systematically tested during performance of this procedure. It should be noted that these are not physical abort coils but software coils controlled by the software`s ladder logic. The readiness of the DACS to properly interface with the ENRAF wire level gauge installed in the SY-101 storage tank will also be tested. During this test, a verification of all abort coil indications will be conducted at the DACS Development Facility in the 306E Building by injecting an input signal for each DACS sensor that has an associated abort coil until the abort coil actuates, and then ensuring that the status of the abort coil indicated at the Master and RSS stations is correct. Each abort coil will also be tested to ensure that the ``ENABLE`` and ``DISABLE`` controls from the Master and RSS stations function correctly, and only with the use of proper passwords.

  3. Operator coil monitoring acceptance test procedure

    SciTech Connect

    Erhart, M.F.

    1995-06-05

    The readiness of the Data Acquisition and Control System (DACS) to provide monitoring and control of the Programmable Logic Controller (PLC) abort coils from the Master and RSS stations will be systematically tested during performance of this procedure. It should be noted that these are not physical abort coils but software coils controlled by the software`s ladder logic. The readiness of the DACS to properly interface with the ENRAF wire level gauge installed in the SY101 storage tank will also be tested. During this test, a verification of all abort coil indications will be conducted at the DACS Development Facility in the 306E Building by injecting an input signal for each DACS sensor that has an associated abort coil until the abort coil actuates, and then ensuring that the status of the abort coil indicated at the Master and RSS stations correct. Each abort coil will also be tested to ensure that the ``ENABLE`` and ``DISABLE`` controls from the Master and RSS stations function correctly, and only with the use of proper passwords.

  4. Acceptance and operability test report for the 327 building retention process sewer diverter station

    SciTech Connect

    Olander, A.R.

    1996-09-04

    This test report includes the results of acceptance and operability testing of the 327 building diverter station. The test included steps for flushing, calibrating, and operating the system on backup power.

  5. GIRAFFE test results summary

    SciTech Connect

    Yokobori, S.; Arai, K.; Oikawa, H.

    1996-03-01

    A passive system can provide engineered safety features enhancing safety system reliability and plant simplicity. Toshiba has conducted the test Program to demonstrate the feasibility of the SBWR passive safety system using a full-height, integral system test facility GIRAFFE. The test facility GIRAFFE models the SBWR in full height to correctly present the gravity driving head forces with a 1/400 volume scale. The GIRAFFE test Program includes the certification tests of the passive containment cooling system (PCCS) to remove the post-accident decay heat and the gravity driven cooling system (GDCS) to replenish the reactor coolant inventory during a LOCA. The test results have confirmed the PCCS and GDCS design and in addition, have demonstrated the operation of the pCCS with the presence of a lighter-than-steam noncondensable as well as with the presence of a heavier-than-steam, noncondensable. The GIRAFFE test Program has also provided the database to qualify a best estimate thermal-hydraulic computer code TRAC. The post test analysis results have shown that TRAC can accurately predict the PCCS heat removal Performance and the containment pressure response to a LOCA. This paper summarizes the GIRAFFE test results to investigate post-LOCA PCCS heat removal performance and post-test analysis using TRAC.

  6. Proposed acceptance, qualification, and characterization tests for thin-film PV modules

    NASA Technical Reports Server (NTRS)

    Waddington, D.; Mrig, L.; Deblasio, R.; Ross, R.

    1988-01-01

    Details of a proposed test program for PV thin-film modules which the Department of Energy has directed the Solar Energy Research Institute (SERI) to prepare are presented. Results of one of the characterization tests that SERI has performed are also presented. The objective is to establish a common approach to testing modules that will be acceptable to both users and manufacturers. The tests include acceptance, qualification, and characterization tests. Acceptance tests verify that randomly selected modules have similar characteristics. Qualification tests are based on accelerated test methods designed to simulate adverse conditions. Characterization tests provide data on performance in a predefined environment.

  7. ASME PTC 46 -- Acceptance test code for overall plant performance

    SciTech Connect

    Friedman, J.R.; Yost, J.G.

    1999-11-01

    ASME published PTC 46 in 1996 after five years of development. PTC 46 is the first industry standard providing explicit procedures for conducting acceptance tests to determine the overall thermal performance and output of power generating units. It is applicable to any heat cycle power generating unit. This survey paper provides an overview of PTC 46 and discusses how PTC 46 can be used for acceptance testing of new combined cycle and fossil steam power generating units. Several technical papers have been previously presented that provide more detailed information and discussion on the use of PTC 46 in acceptance testing.

  8. Your Kidney Test Results

    MedlinePlus

    ... Important Tests Blood Pressure Serum Albumin Bicarbonate Blood Urea Nitrogen (BUN) Potassium Calcium Phosphorus Results Goal: Your ... level in your blood. BUN checks how much urea, a waste product, is in your blood. Potassium ...

  9. W-026, acceptance test report fire alarm system (submittal number 1571.1)

    SciTech Connect

    Watson, T.L., Westinghouse Hanford

    1996-12-16

    This Acceptance Test Report was written by 3-D Protection Systems, Inc., and PCL Construction. WRAP I Facility Engineering, Solid Waste Fire Safety, Kaiser Acceptance Inspector and Hanford Fire Department personnel witnessed this test. All exceptions were resolved. The resolutions are attached. Contractor`s Material and Test Certificates are attached. Results from Solid Waste Industrial Hygiene sound level surveys are also included.

  10. The Murmansk Initiative - RF: Acceptance Testing

    SciTech Connect

    Czajkowski, C.; Wester, D. W.; Dyer, R. S.; Soerlie, A. A.; Moller, B.; Barnes, E.

    2002-02-26

    The Murmansk Initiative-RF (MI) was conceived to provide the Russian Federation (RF) with the capacity to manage low-level liquid radioactive waste (LLRW) and comply with the requirements of the London Convention that prohibit ocean dumping. The trilateral project among Norway, the RF, and the United States of America (U.S.) began in 1994 and was the first to utilize exclusively Russian subcontractors to upgrade and expand an existing LLRW treatment plant on the premises of RTP Atomflot in Murmansk, Russia. The project moved quickly through the design phase. Progress during the construction phase was somewhat slower because of difficulties with acquisition of hardware, inexperience with automated instrumentation and control equipment, and unexpected design changes in the cementation unit. The project advanced into the test-operation phase, which is currently underway, in June 2001. Initial runs with liquid waste have revealed that procedures for unloading spent ion-exchange sorbents could be improved and that sludges formed during removal of alkaline-earth metals should be compacted in order for the facility to operate at its full potential. Resolution of these issues is expected within the next few months.

  11. Acceptance test procedure MICON software exhaust fan control modifications

    SciTech Connect

    SILVAN, G.R.

    1999-05-21

    This acceptance test verifies the MICON program changes for the new automatic transfer switch ATS-2 alarms, the Closed Loop Cooling isolator status, the CB-3 position alarm, and the alarms for the new emergency fan damper backup air compressor.

  12. Product acceptance environmental and destructive testing for reliability.

    SciTech Connect

    Dvorack, Michael A.; Kerschen, Thomas J.; Collins, Elmer W.

    2007-08-01

    To determine whether a component is meeting its reliability requirement during production, acceptance sampling is employed in which selected units coming off the production line are subjected to additional environmental and/or destructive tests that are within the normal environment space to which the component is expected to be exposed throughout its life in the Stockpile. This report describes what these tests are and how they are scored for reliability purposes. The roles of screens, Engineering Use Only tests, and next assembly product acceptance testing are also discussed, along with both the advantages and disadvantages of environmental and destructive testing.

  13. W-026, transuranic waste (TRU) glovebox acceptance test report

    SciTech Connect

    Leist, K.J.

    1998-03-11

    On July 18, 1997, the Transuranic (TRU) glovebox was tested using glovebox acceptance test procedure 13021A-86. The primary focus of the glovebox acceptance test was to examine control system interlocks, display menus, alarms, and operator messages. Limited mechanical testing involving the drum ports, hoists, drum lifter, compacted drum lifter, drum tipper, transfer car, conveyors, sorting table, lidder/delidder device and the TRU empty drum compactor were also conducted. As of February 25, 1998, 10 of the 102 test exceptions that affect the TRU glovebox remain open. These items will be tracked and closed via the WRAP Master Test Exception Database. As part of Test Exception resolution/closure the responsible individual closing the Test Exception performs a retest of the affected item(s) to ensure the identified deficiency is corrected, and, or to test items not previously available to support testing. Test exceptions are provided as appendices to this report.

  14. WRAP low level waste (LLW) glovebox acceptance test report

    SciTech Connect

    Leist, K.J.

    1998-02-17

    In June 28, 1997, the Low Level Waste (LLW) glovebox was tested using glovebox acceptance test procedure 13031A-85. The primary focus of the glovebox acceptance test was to examine control system interlocks, display menus, alarms, and operator messages. Limited mechanical testing involving the drum ports, hoists, drum lifter, compacted drum lifter, drum tipper, transfer car, conveyors, lidder/delidder device and the supercompactor were also conducted. As of November 24, 1997, 2 of the 131 test exceptions that affect the LLW glovebox remain open. These items will be tracked and closed via the WRAP Master Test Exception Database. As part of Test Exception resolution/closure the responsible individual closing the Test Exception performs a retest of the affected item(s) to ensure the identified deficiency is corrected, and, or to test items not previously available to support testing. Test Exceptions are provided as appendices to this report.

  15. PUREX SAMCONS uninterruptible power supply (UPS) acceptance test report

    SciTech Connect

    Blackaby, W.B.

    1997-10-07

    This Acceptance Test Report for the PUREX Surveillance and Monitoring and Control System (SAMCONS) Uninterruptible Power Supply (UPS) Acceptance Test Procedure validates the operation of the UPS, all alarming and display functions and the ability of the UPS to supply power to the SAMCONS as designed. The proper installation of the PUREX SAMCONS Trailer UPS components and wiring will be systematically evaluated by performance of this procedure. Proper operation of the SAMCONS computer UPS will be verified by performance of a timed functional load test, and verification of associated alarms and trouble indications. This test procedure will be performed in the SAMCONS Trailer and will include verification of receipt of alarms at the SAMCONS computer stations. This test may be performed at any time after the completion of HNF-SD-CP-ATP-083, PUREX Surveillance and Monitoring and Control System (SAMCONS) Acceptance Test Procedure, when computer display and alarm functions have been proven to operate correctly.

  16. First Results from The MAGNEX Large Acceptance Spectrometer

    SciTech Connect

    Cunsolo, A.; Cappuzzello, F.; Cavallaro, M.; Orrigo, S. E. A.; Carbone, D.; Schillaci, C.; Foti, A.; Borello-Lewin, T.; Rodrigues, M. R. D.; Petrascu, H.; Winfield, J. S.

    2008-11-11

    The MAGNEX large-acceptance spectrometer was commissioned with beams from the LNS Tandem. First results of physical interest are presented. The obtained 10{sup -3} energy resolution confirms the ambitious characteristic of the calculations and allows considering the instrument as an ideal tool for future studies in the field of nuclear spectroscopy and reaction mechanisms at incident energies not far form the Coulomb barrier.

  17. Lithium cell test results

    NASA Technical Reports Server (NTRS)

    Bragg, B. J.

    1977-01-01

    Three lithium SO2 cells, two lithium CF cells, and a vinyl chloride cell, all with crimped seals, and all strictly experimental, were independently discharged on resistors. Three temperatures were used and several different storage temperatures. Discharge rate generally on the nominal discharges were 0.1 amp, 0.5 amp, and 1 amp. Tests results show that the crimp seals are inadequate, especially for the SO2 cells. Normal discharges present no hazards. All cells discharge to zero. The problem of lithium cell explosions, such as occurred during off-limits testing, is discussed.

  18. Electromagnetic induction moisture measurement system acceptance test plan

    SciTech Connect

    Vargo, G.F., Westinghouse Hanford

    1996-08-01

    The purpose of this acceptance test plan (ATP) is to verify that the mechanical, electrical and software features of the ElectroMagnetic Induction (EMI) probe are operating as designed,and that the unit is ready for field service. The accepted EMI and Surface Moisture Measurement Systems (SMMS) will be used primarily in support of Tank Waste Remediation System (TWRS) Safety Programs for moisture measurement of organic and ferrocyanide watch list tanks.

  19. Type of Speech Material Affects Acceptable Noise Level Test Outcome.

    PubMed

    Koch, Xaver; Dingemanse, Gertjan; Goedegebure, André; Janse, Esther

    2016-01-01

    The acceptable noise level (ANL) test, in which individuals indicate what level of noise they are willing to put up with while following speech, has been used to guide hearing aid fitting decisions and has been found to relate to prospective hearing aid use. Unlike objective measures of speech perception ability, ANL outcome is not related to individual hearing loss or age, but rather reflects an individual's inherent acceptance of competing noise while listening to speech. As such, the measure may predict aspects of hearing aid success. Crucially, however, recent studies have questioned its repeatability (test-retest reliability). The first question for this study was whether the inconsistent results regarding the repeatability of the ANL test may be due to differences in speech material types used in previous studies. Second, it is unclear whether meaningfulness and semantic coherence of the speech modify ANL outcome. To investigate these questions, we compared ANLs obtained with three types of materials: the International Speech Test Signal (ISTS), which is non-meaningful and semantically non-coherent by definition, passages consisting of concatenated meaningful standard audiology sentences, and longer fragments taken from conversational speech. We included conversational speech as this type of speech material is most representative of everyday listening. Additionally, we investigated whether ANL outcomes, obtained with these three different speech materials, were associated with self-reported limitations due to hearing problems and listening effort in everyday life, as assessed by a questionnaire. ANL data were collected for 57 relatively good-hearing adult participants with an age range representative for hearing aid users. Results showed that meaningfulness, but not semantic coherence of the speech material affected ANL. Less noise was accepted for the non-meaningful ISTS signal than for the meaningful speech materials. ANL repeatability was comparable across

  20. Bell Canyon test and results

    SciTech Connect

    Christensen, C. L.; Hunter, T. O.

    1980-01-01

    The purposes of the Borehold Plugging Program are: to identify issues associated with sealing boreholes and shafts; to establish a data base from which to assess the importance of these issues; and to develop sealing criteria, materials, and demonstrative test for the Waste Isolation Pilot Plant (WIPP). The Bell Canyon Test described in this report is one part of that program. Its purpose was to evaluate, in situ, the state of the art in borehole plugs and to identify and resolve problems encountered in evaluating a typical plug installation in anhydrite. The test results are summarized from the work of Peterson and Christensen and divided into two portions: system integrity and wellbore characterization tests prior to plug installation, and a series of tests to evaluate isolation characteristics of the 1.8-m-long plug. Conclusions of the Bell Canyon Test are: brine and fresh-water grouts, with acceptable physical properties in the fluid and hardened states, have been developed; the field data, taken together with laboratory data, suggest that the predominant flow into the test region occurs through the cement plug/borehold interface region, with lesser contributions occurring through the wellbore damage zone, the plug core, and the surrounding undisturbed anhydrite bed; and the 1.8-m-long by 20-cm-diameter grout plug, installed in anhydrite at a depth of 1370 m in the AEC-7 borehole, limits flow from the high pressure Bell Canyon aquifer to 0.6 liters/day.

  1. Acceptance test report, plutonium finishing plant life safety upgrade

    SciTech Connect

    Hodge, S.G.

    1994-12-02

    This acceptance Test Procedure (ATP) has been prepared to demonstrate that modifications to the Fir Protection systems function as required by project criteria. The ATP will test the Fire Alarm Control Panels, Flow Alarm Pressure Switch, Heat Detectors, Smoke Detectors, Flow Switches, Manual Pull Stations, and Gong/Door By Pass Switches.

  2. Type of Speech Material Affects Acceptable Noise Level Test Outcome

    PubMed Central

    Koch, Xaver; Dingemanse, Gertjan; Goedegebure, André; Janse, Esther

    2016-01-01

    The acceptable noise level (ANL) test, in which individuals indicate what level of noise they are willing to put up with while following speech, has been used to guide hearing aid fitting decisions and has been found to relate to prospective hearing aid use. Unlike objective measures of speech perception ability, ANL outcome is not related to individual hearing loss or age, but rather reflects an individual’s inherent acceptance of competing noise while listening to speech. As such, the measure may predict aspects of hearing aid success. Crucially, however, recent studies have questioned its repeatability (test–retest reliability). The first question for this study was whether the inconsistent results regarding the repeatability of the ANL test may be due to differences in speech material types used in previous studies. Second, it is unclear whether meaningfulness and semantic coherence of the speech modify ANL outcome. To investigate these questions, we compared ANLs obtained with three types of materials: the International Speech Test Signal (ISTS), which is non-meaningful and semantically non-coherent by definition, passages consisting of concatenated meaningful standard audiology sentences, and longer fragments taken from conversational speech. We included conversational speech as this type of speech material is most representative of everyday listening. Additionally, we investigated whether ANL outcomes, obtained with these three different speech materials, were associated with self-reported limitations due to hearing problems and listening effort in everyday life, as assessed by a questionnaire. ANL data were collected for 57 relatively good-hearing adult participants with an age range representative for hearing aid users. Results showed that meaningfulness, but not semantic coherence of the speech material affected ANL. Less noise was accepted for the non-meaningful ISTS signal than for the meaningful speech materials. ANL repeatability was comparable

  3. Acceptance test report for the Westinghouse 100 ton hydraulic trailer

    SciTech Connect

    Barrett, R.A.

    1995-03-06

    The SY-101 Equipment Removal System 100 Ton Hydraulic Trailer was designed and built by KAMP Systems, Inc. Performance of the Acceptance Test Procedure at KAMP`s facility in Ontario, California (termed Phase 1 in this report) was interrupted by discrepancies noted with the main hydraulic cylinder. The main cylinder was removed and sent to REMCO for repair while the trailer was sent to Lampson`s facility in Pasco, Washington. The Acceptance Test Procedure was modified and performance resumed at Lampson (termed Phase 2 in this report) after receipt of the repaired cylinder. At the successful conclusion of Phase 2 testing the trailer was accepted as meeting all the performance criteria specified.

  4. Acceptance Test Plan for the Sludge Pickup Adaptor

    SciTech Connect

    PITNER, A.L.

    2000-03-29

    This test plan documents the acceptance testing of the sludge pickup adapter for potential use during PSI Phases 3 and 4 fuel cleanliness inspection activities. The adaptex is attached to the strainer tip of the vacuum wand and used to suction up residual sludge captured in a sludge collection tray. The material is vacuumed into a chamber of known volume in the sludge pickup adapter. The device serves as an aid in helping to determine whether the observed quantity of sludge is within allowable limits (1.4 cm{sup 3} per fuel assembly). This functionality test involves underwater testing in the 305 Building Cold Test Facility to verify that sludge can be successfully vacuumed from a collection tray. Ancillary activities in this acceptance test include demonstration that the sludge pickup adapter CM be successfully attached to and detached from the vacuum wand underwater.

  5. Acceptance test procedure for the MO-293 (1722) 10-wide mobile office

    SciTech Connect

    Wallace, S.C.

    1994-12-28

    This Acceptance Test Procedure has been prepared to demonstrate that the Fire Protection System functions as required by project criteria. The test results will be issued as an acceptance test report after all the testing is complete. This facility is part of the Spent Nuclear Fuel Project. An appendix is provided as a checklist of activities to be performed by the fire alarm system installer to ensure proper installation and operation.

  6. Acceptance test report for the Tank 241-C-106 in-tank imaging system

    SciTech Connect

    Pedersen, L.T.

    1998-05-22

    This document presents the results of Acceptance Testing of the 241-C-106 in-tank video camera imaging system. The purpose of this imaging system is to monitor the Project W-320 sluicing of Tank 241-C-106. The objective of acceptance testing of the 241-C-106 video camera system was to verify that all equipment and components function in accordance with procurement specification requirements and original equipment manufacturer`s (OEM) specifications. This document reports the results of the testing.

  7. Verification and acceptance tests of the PRIMA DDL optics

    NASA Astrophysics Data System (ADS)

    Bizenberger, Peter; Baumeister, Harald; Graser, Uwe; Henning, Thomas; Krause, Nathalie; Launhardt, Ralf; Naranjo, Vianak; Queloz, Didier; Quirrenbach, Andreas

    2008-07-01

    The last step in designing and building instruments are the verification and acceptance tests of the assembled units and of the final instrument. For instruments, which are engineered to work at the limit of feasibility, these tests must be accurate and stable at a level much better than the expected performance of the instrument. Particularly for interferometric instruments, this requires special care for the test planning and implementation in order to achieve the necessary performance. This paper describes the verification and acceptance tests of the PRIMA DDL optics in terms of wavefront error and tilt requirements as well as the assembling and aligning accuracy. We demonstrate the conformity of the optics and point out the limitations of the test methods.

  8. COLD TEST LOOP INTEGRATED TEST LOOP RESULTS

    SciTech Connect

    Abraham, TJ

    2003-10-22

    device, did not operate effectively. Consequently, it is not suitable for application to the AWR process. (4) Initially, the spray ring (operated at approximately 2300 psi) and the nozzles provided by the pump vendor did not perform acceptably. The nozzles were replaced with a more robust model, and the performance was then acceptable. (5) The average solids concentration achieved in the slurry before Bentogrout addition was approximately 16% by weight. The solids concentration of the slurry after Bentogrout addition ranged from 26% to approximately 40%. The slurry pump and ITL system performed well at every concentration. No line plugging or other problems were noted. The results of the CTL runs and later ITL testing are summarized in an appendix to this report.

  9. 46 CFR 164.013-5 - Acceptance tests.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 6 2013-10-01 2013-10-01 false Acceptance tests. 164.013-5 Section 164.013-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL MATERIALS Foam, Unicellular Polyethylene (Buoyant, Slab, Slitted Trigonal...

  10. 46 CFR 164.013-5 - Acceptance tests.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 6 2011-10-01 2011-10-01 false Acceptance tests. 164.013-5 Section 164.013-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL MATERIALS Foam, Unicellular Polyethylene (Buoyant, Slab, Slitted Trigonal...

  11. 46 CFR 164.013-5 - Acceptance tests.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Acceptance tests. 164.013-5 Section 164.013-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL MATERIALS Foam, Unicellular Polyethylene (Buoyant, Slab, Slitted Trigonal...

  12. 46 CFR 164.013-5 - Acceptance tests.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 6 2012-10-01 2012-10-01 false Acceptance tests. 164.013-5 Section 164.013-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL MATERIALS Foam, Unicellular Polyethylene (Buoyant, Slab, Slitted Trigonal...

  13. Probabilistic Requirements (Partial) Verification Methods Best Practices Improvement. Variables Acceptance Sampling Calculators: Empirical Testing. Volume 2

    NASA Technical Reports Server (NTRS)

    Johnson, Kenneth L.; White, K. Preston, Jr.

    2012-01-01

    The NASA Engineering and Safety Center was requested to improve on the Best Practices document produced for the NESC assessment, Verification of Probabilistic Requirements for the Constellation Program, by giving a recommended procedure for using acceptance sampling by variables techniques as an alternative to the potentially resource-intensive acceptance sampling by attributes method given in the document. In this paper, the results of empirical tests intended to assess the accuracy of acceptance sampling plan calculators implemented for six variable distributions are presented.

  14. Acceptance Test Plan for Fourth-Generation Corrosion Monitoring Cabinet

    SciTech Connect

    NORMAN, E.C.

    2000-10-23

    This Acceptance Test Plan (ATP) will document the satisfactory operation of the third-generation corrosion monitoring cabinet (Hiline Engineering Part No.0004-CHM-072-C01). This ATP will be performed by the manufacturer of the cabinet prior to delivery to the site. The objective of this procedure is to demonstrate and document the acceptance of the corrosion monitoring cabinet. The test will consist of a continuity test of the cabinet wiring from the end of cable to be connected to corrosion probe, through the appropriate intrinsic safety barriers and out to the 15 pin D-shell connectors to be connected to the corrosion monitoring instrument. Additional testing will be performed using a constant current and voltage source provided by the corrosion monitoring hardware manufacturer to verify proper operation of corrosion monitoring instrumentation.

  15. Redstone Test Stand Accepted Into National Register of Historical Places

    NASA Technical Reports Server (NTRS)

    1976-01-01

    On October 02, 1976, Marshall Space Flight Center's (MSFC) Redstone test stand was received into the National Registry of Historical Places. Photographed in front of the Redstone test stand are Dr. William R. Lucas, MSFC Center Director from June 15, 1974 until July 3, 1986, as he is accepting a certificate of registration from Madison County Commission Chairman James Record, and Huntsville architect Harvie Jones.

  16. Rotary mode core sampling service trailer Acceptance Test Plan

    SciTech Connect

    Kostelnik, A.J.

    1994-11-28

    This Acceptance Test Procedure (ATP) will document compliance with the requirements of specification WHC-S-056 Rev.2 including ECNs 608798 and 616386. The equipment being tested is a furniture type trailer with storage cabinets, lighting and HVAC systems installed. The unit was purchased as a Design and Fabrication procurement activity. The ATP be performed by representatives of the Westinghouse Hanford Company with the assistance of the Seller at the Seller`s location.

  17. PUREX (SAMCONS) uninterruptible power supply (UPS) acceptance test procedure

    SciTech Connect

    Blackaby, W.B.

    1997-09-01

    This Acceptance Test Procedure for the PUREX Surveillance and Monitoring and Control System (SAMCONS) Uninterruptible Power Supply (UPS) provides for testing and verifying the proper operation of the control panel alarms and trouble functions, the 6roper functioning of the AC inverter, ability of the battery supply to maintain the SAMCONS load for a minimum of two hours , and proper interaction with the SAMCONS Video graphic displays for alarm displays.

  18. NEVADA TEST SITE WASTE ACCEPTANCE CRITERIA, JUNE 2006

    SciTech Connect

    U.S. DEPARTMENT OF ENERGY, NATIONAL NUCLEAR SECURITY ADMINISTRATION NEVADA SITE OFFICE

    2006-06-01

    This document establishes the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) waste acceptance criteria (WAC). The WAC provides the requirements, terms, and conditions under which the Nevada Test Site (NTS) will accept low-level radioactive (LLW) and mixed waste (MW) for disposal. It includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the NTS Area 3 and Area 5 Radioactive Waste Management Complex (RWMC) for storage or disposal.

  19. Startup of the FFTF sodium cooled reactor. [Acceptance Test Program

    SciTech Connect

    Redekopp, R.D.; Umek, A.M.

    1981-03-01

    The Fast Flux Test Facility (FFTF), located on the Department of Energy (DOE) Hanford Reservation near Richland, Washington, is a 3 Loop 400 MW(t) sodium cooled fast reactor with a primary mission to test fuels and materials for development of the Liquid Metal Fast Breeder Reactor (LMFBR). Bringing FFTF to a condition to accomplish this mission is the goal of the Acceptance Test Program (ATP). This program was the mechanism for achieving startup of the FFTF. Highlights of the ATP involving the system inerting, liquid metal and inerted cell testing and initial ascent to full power are discussed.

  20. Acceptance of Genetic Testing in a General Population: Age, Education and Gender Differences.

    ERIC Educational Resources Information Center

    Aro, A. R.; Hakonen, A.; Hietala, M.; Lonnqvist, J.; Niemela, P.; Peltonen, L; Aula, P.

    1997-01-01

    Effects of age, education, and gender on acceptance of genetic testing were studied. Finnish participants responded to a questionnaire presenting reasons for and against genetic testing (N=1,967). Intentions to take genetic tests, worries, and experience of genetic test or hereditary disease were also assessed. Results are presented and discussed.…

  1. Final Acceptance Tests of Helium Refrigerator for Wendelstein 7-X

    NASA Astrophysics Data System (ADS)

    Dhard, C. P.; Nagel, M.; Raatz, S.; Nuesslein, U.; Ressel, M.

    Following successful installation and commissioning, final acceptance tests were carried out on the helium refrigerator for Wendelstein 7-X.The tests were carried out for the normal operating modes i.e. peak power mode (3.4 K), standard mode(3.9 K), short standby mode (< 10 K) and long standby mode (< 100 K).Besides the normal modes, the transient modes including, cool-down and warm-up, auto interchanging between various modes and the purging modes were tested.In addition, the handling of quench, emergency signals such as cryostat vacuum break,utility failure, alarm and trip signals were checked.

  2. Results of Deposition Scoping Tests

    SciTech Connect

    Hu, M.Z.

    2003-03-04

    The processes of crystallization and solid deposit formation that led to the shutdown of the 2H evaporator operation at the Savannah River Site (SRS) and that could possibly cause similar problems in the future or in other evaporators need to be better understood. Through experimentation, thermodynamic modeling, and correlation of scaling to historical tank farm operations, progress has been made in developing guidelines as to the concentrations of silicon and aluminum that can be processed by evaporators while avoiding unacceptable levels of scale formation. However, because of limitations of the thermodynamic model and an insufficient amount of operational data at slightly supersaturated concentration levels, uncertainty still exists regarding acceptable feed concentrations. The objective of this effort is to provide information that can be used in defining acceptable levels of silicon and aluminum in evaporator feed solutions. Data collected previously showed that particle formation reactions can be rapid at evaporator temperatures for elevated silicon and aluminum concentrations. However, insufficient data exists to estimate the silicon and aluminum concentrations above which solids will form in the time frame of evaporator processing. The work described in this report was designed to determine the induction period for solutions of decreasing aluminum and silicon concentration such that the supersaturation level corresponding to a 4-h induction time for particle nucleation/growth in bulk solution can be estimated. In addition, experiments were conducted to explore the supersaturation levels that can result in deposition of solids on metal surfaces at varying aluminum-to-silicon concentration ratios. Laboratory studies of particle growth in solution were conducted at relatively low supersaturation levels. Dynamic-light-scattering (DLS) studies and deposition tests, similar to those performed in FY 2001, were conducted with solutions at relatively low

  3. MCO combustible gas management leak test acceptance criteria

    SciTech Connect

    SHERRELL, D.L.

    1999-05-11

    Existing leak test acceptance criteria for mechanically sealed and weld sealed multi-canister overpacks (MCO) were evaluated to ensure that MCOs can be handled and stored in stagnant air without compromising the Spent Nuclear Fuel Project's overall strategy to prevent accumulation of combustible gas mixtures within MCO's or within their surroundings. The document concludes that the integrated leak test acceptance criteria for mechanically sealed and weld sealed MCOs (1 x 10{sup -5} std cc/sec and 1 x 10{sup -7} std cc/sec, respectively) are adequate to meet all current and foreseeable needs of the project, including capability to demonstrate compliance with the NFPA 60 Paragraph 3-3 requirement to maintain hydrogen concentrations [within the air atmosphere CSB tubes] t or below 1 vol% (i.e., at or below 25% of the LFL).

  4. ISOLOK VALVE ACCEPTANCE TESTING FOR DWPF SME SAMPLING PROCESS

    SciTech Connect

    Edwards, T.; Hera, K.; Coleman, C.; Jones, M.; Wiedenman, B.

    2011-12-05

    Evaluation of the Defense Waste Processing Facility (DWPF) Chemical Process Cell (CPC) cycle time identified several opportunities to improve the CPC processing time. Of the opportunities, a focus area related to optimizing the equipment and efficiency of the sample turnaround time for DWPF Analytical Laboratory was identified. The Mechanical Systems & Custom Equipment Development (MS&CED) Section of the Savannah River National Laboratory (SRNL) evaluated the possibility of using an Isolok{reg_sign} sampling valve as an alternative to the Hydragard{reg_sign} valve for taking process samples. Previous viability testing was conducted with favorable results using the Isolok sampler and reported in SRNL-STI-2010-00749 (1). This task has the potential to improve operability, reduce maintenance time and decrease CPC cycle time. This report summarizes the results from acceptance testing which was requested in Task Technical Request (TTR) HLW-DWPF-TTR-2010-0036 (2) and which was conducted as outlined in Task Technical and Quality Assurance Plan (TTQAP) SRNL-RP-2011-00145 (3). The Isolok to be tested is the same model which was tested, qualified, and installed in the Sludge Receipt Adjustment Tank (SRAT) sample system. RW-0333P QA requirements apply to this task. This task was to qualify the Isolok sampler for use in the DWPF Slurry Mix Evaporator (SME) sampling process. The Hydragard, which is the current baseline sampling method, was used for comparison to the Isolok sampling data. The Isolok sampler is an air powered grab sampler used to 'pull' a sample volume from a process line. The operation of the sampler is shown in Figure 1. The image on the left shows the Isolok's spool extended into the process line and the image on the right shows the sampler retracted and then dispensing the liquid into the sampling container. To determine tank homogeneity, a Coliwasa sampler was used to grab samples at a high and low location within the mixing tank. Data from the two locations

  5. Acceptance testing of integrated picture archiving and communications systems.

    PubMed

    Lewis, T E; Horton, M C; Kinsey, T V; Shelton, P D

    1999-05-01

    An integrated picture archiving and communication system (PACS) is a large investment in both money and resources. With all of the components and systems contained in the PACS, a methodical set of protocols and procedures must be developed to test all aspects of the PACS within the short time allocated for contract compliance. For the Department of Defense (DoD), acceptance testing (AT) sets the protocols and procedures. Broken down into modules and test procedures that group like components and systems, the AT protocol maximizes the efficiency and thoroughness of testing all aspects of an integrated PACS. A standardized and methodical protocol reduces the probability of functionality or performance limitations being overlooked. The AT protocol allows complete PACS testing within the 30 days allocated by the digital imaging network (DIN)-PACS contract. AT shortcomings identified during the testing phase properly allows for resolution before complete acceptance of the system. This presentation will describe the evolution of the process, the components of the DoD AT protocol, the benefits of the AT process, and its significance to the successful implementation of a PACS. This is a US government work. There are no restrictions on its use. PMID:10342200

  6. When is diagnostic testing inappropriate or irrational? Acceptable regret approach.

    PubMed

    Hozo, Iztok; Djulbegovic, Benjamin

    2008-01-01

    The authors provide a new model within the framework of theories of bounded rationality for the observed physicians' behavior that their ordering of diagnostic tests may not be rational. Contrary to the prevailing thinking, the authors find that physicians do not act irrationally or inappropriately when they order diagnostic tests in usual clinical practice. When acceptable regret (i.e., regret that a decision maker finds tolerable upon making a wrong decision) is taken into account, the authors show that physicians tend to order diagnostic tests at a higher level of pretest probability of disease than predicted by expected utility theory. They also show why physicians tend to overtest when regret about erroneous decisions is extremely small. Finally, they explain variations in the practice of medicine. They demonstrate that in the same clinical situation, different decision makers might have different acceptable regret thresholds for withholding treatment, for ordering a diagnostic test, or for administering treatment. This in turn means that for some decision makers, the most rational strategy is to do nothing, whereas for others, it may be to order a diagnostic test, and still for others, choosing treatment may be the most rational course of action. PMID:18480041

  7. Acceptance of HIV Antibody Testing Among Women in Domestic Violence Shelters

    PubMed Central

    Ratcliff, Tanya M.; Zlotnick, Caron; Cu-Uvin, Susan; Payne, Nanetta; Sly, Kaye; Flanigan, Timothy

    2015-01-01

    The purpose of this study was to examine which factors derived from an adapted version of the Health Belief Model are associated with HIV testing among women at domestic violence shelters in the rural south (N = 112). Participants were administered self-report questionnaires to assess for test acceptance and were offered private and free HIV rapid testing. A logistic regression analysis was performed. Results indicated that higher perceived susceptibility and higher PTSD symptoms predicted a greater likelihood of HIV test acceptance. The most common reason given for not testing was a lack of time. Implications are discussed. PMID:26085820

  8. Pressure locking test results

    SciTech Connect

    DeWall, K.G.; Watkins, J.C.; McKellar, M.G.; Bramwell, D.

    1996-12-01

    The U.S. Nuclear Regulatory Commission (NRC), Office of Nuclear Regulatory Research, is funding the Idaho National Engineering Laboratory (INEL) in performing research to provide technical input for their use in evaluating responses to Generic Letter 95-07, {open_quotes}Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves.{close_quotes} Pressure locking and thermal binding are phenomena that make a closed gate valve difficult to open. This paper discusses only the pressure locking phenomenon in a flexible-wedge gate valve; the authors will publish the results of their thermal binding research at a later date. Pressure locking can occur when operating sequences or temperature changes cause the pressure of the fluid in the bonnet (and, in most valves, between the discs) to be higher than the pressure on the upstream and downstream sides of the disc assembly. This high fluid pressure presses the discs against both seats, making the disc assembly harder to unseat than anticipated by the typical design calculations, which generally consider friction at only one of the two disc/seat interfaces. The high pressure of the bonnet fluid also changes the pressure distribution around the disc in a way that can further contribute to the unseating load. If the combined loads associated with pressure locking are very high, the actuator might not have the capacity to open the valve. The results of the NRC/INEL research discussed in this paper show that the relationship between bonnet pressure and pressure locking stem loads appears linear. The results also show that for this valve, seat leakage affects the bonnet pressurization rate when the valve is subjected to thermally induced pressure locking conditions.

  9. Nevada Test Site waste acceptance criteria [Revision 1

    SciTech Connect

    1997-08-01

    Revision one updates the requirements, terms, and conditions under which the Nevada Test Site (NTS) will accept low-level radioactive and mixed waste for disposal; and transuranic and transuranic mixed waste for interim storage at the NTS. Review each section of this document. This document is not intended to include all of the requirements; rather, it is meant as a guide toward meeting the regulations. All references in this document should be observed to avoid omission of requirements on which acceptance or rejection of waste will be based. The Department of Energy/Nevada Operations Office (DOE/NV) and support contractors are available to assist you in understanding or interpreting this document.

  10. Acceptance Test Report for Fourth Generation Hanford Corrosion Monitoring System

    SciTech Connect

    NORMAN, E.C.

    2000-10-23

    This Acceptance Test Report (ATR) will document the satisfactory operation of the corrosion probe cabinets destined for installation on tanks 241-AN-102 and 241-AN-107. This ATR will be performed by the manufacturer on each cabinet prior to delivery to the site. The objective of this procedure is to demonstrate and document the acceptance of the corrosion monitoring cabinets to be installed on tanks 241-AN-102 and 241-AN-107. One cabinet will be installed on each tank. Each cabinet will contain corrosion monitoring hardware to be connected to existing corrosion probes already installed in each tank. The test will consist of a continuity test of the cabinet wiring from the end of cable to be connected to corrosion probe, through the appropriate intrinsic safety barriers and out to the 15 pin D-shell connectors to be connected to the corrosion monitoring instrument. Additional testing will be performed using a constant current and voltage source provided by the corrosion monitoring hardware manufacturer to verify proper operation of corrosion monitoring instrumentation (input a known signal and see if the instrumentation records the proper value).

  11. Acceptance test plan for fourth generation Hanford corrosion monitoring system

    SciTech Connect

    NORMAN, E.C.

    2000-07-27

    This Acceptance Test Plan (ATP) will document the satisfactory operation of the corrosion probe cabinets destined for installation on tanks 241-AN-102 and 241-AN-107. This ATP will be performed by the manufacturer on each cabinet prior to delivery to the site. The objective of this procedure is to demonstrate and document the acceptance of the corrosion monitoring cabinets to be installed on tanks 241-AN-102 and 241-AN-107. One cabinet will be installed on each tank. Each cabinet will contain corrosion monitoring hardware to be connected to existing corrosion probes already installed in each tank. The test will consist of a continuity test of the cabinet wiring from the end of cable to be connected to corrosion probe, through the appropriate intrinsic safety barriers and out to the 15 pin D-shell connectors to be connected to the corrosion monitoring instrument. Additional testing will be performed using a constant current and voltage source provided by the corrosion monitoring hardware manufacturer to verify proper operation of corrosion monitoring instrumentation (input a known signal and see if the instrumentation records the proper value).

  12. Acceptability of prenatal testing and termination of pregnancy in Pakistan.

    PubMed

    Jafri, H; Hewison, J; Sheridan, E; Ahmed, S

    2015-01-01

    This study aimed to assess acceptability of prenatal testing (PNT) and termination of pregnancy (TOP) for a range of conditions in Pakistani parents with and without a child with a genetic condition. A structured questionnaire assessing acceptability of PNT and TOP for 30 conditions was completed by 400 Pakistani participants: 200 parents with a child with a genetic condition (100 fathers and 100 mothers) and 200 parents without an affected child (100 fathers and 100 mothers). There was a high level of interest in PNT, where over 80 % of parents in all four study groups would want PNT for the majority of the conditions. There was comparatively less interest in TOP for the same conditions (ranging from 5 to 70 % of parents, with mothers of an affected child being most interested). Parents were most likely to be interested in TOP for conditions at the serious end of the continuum. More than half of the participants in each group would consider TOP for anencephaly and quadriplegia. The interest in PNT and TOP for a range of conditions suggests that rapidly developing PNT technologies are likely to be acceptable in Pakistan, a low-middle income level and Muslim country. The comparatively lower level of interest in TOP for the same conditions highlights ethical dilemmas that such technologies are likely to raise. PMID:25081227

  13. [Clinical trial data validation and user acceptance testing].

    PubMed

    Sun, Hua-long; Dai, Nan

    2015-11-01

    For pharmaceutical industries, clinical data is one of the most valuable deliverables. It is also the basis of analysis, submission, approval, labeling and marketing of a drug product. To ensure the integrity and reliability of clinical data, a scientific standardized quality control (QC) has to be established at each step of a clinical trial. Data validation is conducted to ensure the reasonability and compliance of clinical data by checking data quality before the data is statistically analyzed. This paper focuses on purpose of data validation, creation of data validation plan, rationale of data validation, types of data validation and performance of user acceptance testing on clinical database. PMID:26911047

  14. Acceptance test procedure for SY Tank Farm replacement exhauster unit

    SciTech Connect

    Becken, G.W.

    1994-12-16

    The proper functioning of a new 241-SY Tank Farm replacement exhauster will be acceptance tested, to establish operability and to provide an operational baseline for the equipment. During this test, a verification of all of the alarm and control circuits associated with the exhaust, which provide operating controls and/or signals to local and remote alarm/annunciator panels, shall be performed. Test signals for sensors that provide alarms, warnings, and/or interlocks will be applied to verify that alarm, warning, and interlock setpoints are correct. Alarm and warning lights, controls, and local and remote readouts for the exhauster will be verified to be adequate for proper operation of the exhauster. Testing per this procedure shall be conducted in two phases. The first phase of testing, to verify alarm, warning, and interlock setpoints primarily, will be performed in the MO-566 Fab Shop. The second phase of testing, to verify proper operation and acceptable interface with other tank farm systems, will be conducted after the exhauster and all associated support and monitoring equipment have been installed in the SY Tank Farm. The exhauster, which is mounted on a skid and which will eventually be located in the SY tank farm, receives input signals from a variety of sensors mounted on the skid and associated equipment. These sensors provide information such as: exhauster system inlet vacuum pressure; prefilter and HEPA filter differential pressures; exhaust stack sampler status; exhaust fan status; system status (running/shut down); and radiation monitoring systems status. The output of these sensors is transmitted to the exhauster annunciator panel where the signals are displayed and monitored for out-of-specification conditions.

  15. ABSL 18650HC Lot Acceptance Test- Ensuring Consistency And Flight Performance

    NASA Astrophysics Data System (ADS)

    Buckle, Rachel; Thwaite, Carl

    2011-10-01

    ABSL manufactures Space batteries using commercial cells. As the battery sizing is based on test data from cells purchased up to 10 years ago, a rigorous programme of testing is carried out to ensure batch consistency, flight quality and any implications for sizing are found early. A Lot Acceptance Test (LAT) is carried out on each new batch of cells purchased. A selection of cells undergo tests on their build quality, environmental tolerance, safety devices and lifetime degradation. This process will be described, along with issues such as setting acceptance criteria, comparison of results between batches, and what happens if a batch fails.

  16. Topographical mapping system for radiological and hazardous environments acceptance testing

    SciTech Connect

    Armstrong, G.A.; Dochat, G.R.

    1997-12-01

    During the summer of 1996, the Topographical Mapping System (TMS) for hazardous and radiological environments and its accompanying three-dimensional (3-D) visualization tool, the Interactive Computer-Enhanced Remote-Viewing System (ICERVS), were delivered to Oak Ridge National Laboratory (ORNL). ORNL and Mechanical Technology, Inc., performed final acceptance testing of the TMS during the next eight months. The TMS was calibrated and characterized during this period. This paper covers the calibration, characterization, and acceptance testing of the TMS. Development of the TMS and ICERVS was initiated by the US Department of Energy (DOE) for the purpose of characterization and remediation of underground storage tanks (USTs) at DOE sites across the country. DOE required a 3-D, topographical mapping system suitable for use in hazardous and radiological environments. The intended application is the mapping of the interior of USTs as part of DOE`s waste characterization and remediation efforts and to obtain baseline data on the content of the storage tank interiors as well as data on changes in the tank contents and levels brought about by waste remediation steps. Initially targeted for deployment at the Hanford Washington site, the TMS is designed to be a self-contained, compact, and reconfigurable system that is capable of providing rapid, variable-resolution mapping information in poorly characterized workspaces with a minimum of operator intervention.

  17. Topographical mapping system for radiological and hazardous environments acceptance testing

    NASA Astrophysics Data System (ADS)

    Armstrong, Gary A.; Dochat, G. R.

    1997-09-01

    During the summer of 1996, the topographical mapping system (TMS) for hazardous and radiological environments and its accompanying three-dimensional (3-D) visualization tool, the interactive computer-enhanced remote-viewing system (ICERVS), were delivered to Oak Ridge National Laboratory (ORNL). ORNL and Mechanical Technology, Inc., performed final acceptance testing of the TMS during the next eight months. The TMS was calibrated and characterized during this period. This paper covers the calibration, characterization, and acceptance testing of the TMS. Development of the TMS and the ICERVS was initiated by the U.S. Department of Energy (DOE) for the purpose of characterization and remediation of underground storage tanks (USTs) at DOE sites across the country. DOE required a 3-D, topographical mapping system suitable for use in hazardous and radiological environments. The intended application is the mapping of the interior of USTs as part of DOE's waste characterization and remediation efforts and to obtain baseline data on the content of the storage tank interiors as well as data on changes in the tank contents and levels brought about by waste remediation steps. Initially targeted for deployment at the Hanford Washington site, the TMS is designed to be a self-contained, compact, reconfigurable system that is capable of providing rapid, variable-resolution mapping information in poorly characterized workspaces with a minimum of operator intervention.

  18. 241-AZ-101 Waste Tank Color Video Camera System Shop Acceptance Test Report

    SciTech Connect

    WERRY, S.M.

    2000-03-23

    This report includes shop acceptance test results. The test was performed prior to installation at tank AZ-101. Both the camera system and camera purge system were originally sought and procured as a part of initial waste retrieval project W-151.

  19. MER ARA pyroshock test results

    NASA Technical Reports Server (NTRS)

    Chang, Kurng Y.

    2004-01-01

    This paper presents the shock test results achieved in the MER ARA/brush motor pyroshock qualification. The results of MER flight system pyrofiring tests in comparison with the ARA shock test requirements are discussed herein. Alternate test methods were developed in an effort to qualify the critical MER equipment for adequate performance in the actual flight pyroshock condition.

  20. Delinquency and Peer Acceptance in Adolescence: A Within-Person Test of Moffitt’s Hypotheses

    PubMed Central

    Rulison, Kelly L; Kreager, Derek A.; Osgood, D. Wayne

    2015-01-01

    We tested two hypotheses derived from Moffitt’s (1993) taxonomic theory of antisocial behavior, both of which are central to her explanation for the rise in delinquency during adolescence. Specifically, we tested whether persistently delinquent individuals become more accepted by their peers during adolescence and whether individuals who abstain from delinquent behavior become less accepted. Participants were 4,359 adolescents from 14 communities in the PROSPER study, which assessed friendship networks and delinquency from 6th (M = 11.8 years) to 9th (M = 15.3 years) grade. We operationalized peer acceptance as: number of nominations received (indegree centrality), attractiveness as a friend (adjusted indegree centrality), and network bridging potential (betweenness centrality) and tested the hypotheses using multilevel modeling. Contrary to Moffitt’s hypothesis, persistently delinquent youth did not become more accepted between early and middle adolescence, and although abstainers were less accepted in early adolescence, they became more accepted over time. Results were similar for boys and girls; when differences occurred, they provided no support for Moffitt’s hypotheses for boys and were opposite of her hypotheses for girls. Sensitivity analyses using alternative strategies and additional data to identify persistently delinquent adolescents produced similar results. We explore the implications of these results for Moffitt’s assertions that social mimicry of persistently antisocial adolescents leads to increases in delinquency and that social isolation leads to abstention. PMID:25243328

  1. Delinquency and peer acceptance in adolescence: a within-person test of Moffitt's hypotheses.

    PubMed

    Rulison, Kelly L; Kreager, Derek A; Osgood, D Wayne

    2014-11-01

    We tested 2 hypotheses derived from Moffitt's (1993) taxonomic theory of antisocial behavior, both of which are central to her explanation for the rise in delinquency during adolescence. We tested whether persistently delinquent individuals become more accepted by their peers during adolescence and whether individuals who abstain from delinquent behavior become less accepted. Participants were 4,359 adolescents from 14 communities in the PROSPER study, which assessed friendship networks and delinquency from 6th (M = 11.8 years) to 9th (M = 15.3 years) grade. We operationalized peer acceptance as number of nominations received (indegree centrality), attractiveness as a friend (adjusted indegree centrality), and network bridging potential (betweenness centrality) and tested the hypotheses with multilevel modeling. Contrary to Moffitt's hypothesis, persistently delinquent youths did not become more accepted between early and middle adolescence, and although abstainers were less accepted in early adolescence, they became more accepted over time. Results were similar for boys and girls; when differences occurred, they provided no support for Moffitt's hypotheses for boys and were opposite of her hypotheses for girls. Sensitivity analyses in which alternative strategies and additional data were used to identify persistently delinquent adolescents produced similar results. We explore the implications of these results for Moffitt's assertions that social mimicry of persistently antisocial adolescents leads to increases in delinquency and that social isolation leads to abstention. (PsycINFO Database Record (c) 2014 APA, all rights reserved). PMID:25243328

  2. General Mission Analysis Tool (GMAT) Acceptance Test Plan [Draft

    NASA Technical Reports Server (NTRS)

    Dove, Edwin; Hughes, Steve

    2007-01-01

    The information presented in this Acceptance Test Plan document shows the current status of the General Mission Analysis Tool (GMAT). GMAT is a software system developed by NASA Goddard Space Flight Center (GSFC) in collaboration with the private sector. The GMAT development team continuously performs acceptance tests in order to verify that the software continues to operate properly after updates are made. The GMAT Development team consists of NASA/GSFC Code 583 software developers, NASA/GSFC Code 595 analysts, and contractors of varying professions. GMAT was developed to provide a development approach that maintains involvement from the private sector and academia, encourages collaborative funding from multiple government agencies and the private sector, and promotes the transfer of technology from government funded research to the private sector. GMAT contains many capabilities, such as integrated formation flying modeling and MATLAB compatibility. The propagation capabilities in GMAT allow for fully coupled dynamics modeling of multiple spacecraft, in any flight regime. Other capabilities in GMAT inclucle: user definable coordinate systems, 3-D graphics in any coordinate system GMAT can calculate, 2-D plots, branch commands, solvers, optimizers, GMAT functions, planetary ephemeris sources including DE405, DE200, SLP and analytic models, script events, impulsive and finite maneuver models, and many more. GMAT runs on Windows, Mac, and Linux platforms. Both the Graphical User Interface (GUI) and the GMAT engine were built and tested on all of the mentioned platforms. GMAT was designed for intuitive use from both the GUI and with an importable script language similar to that of MATLAB.

  3. MAC Version 3.3, MBA Version 1.3 acceptance test summary report

    SciTech Connect

    Russell, V.K.

    1994-11-02

    The K Basins Materials Accounting (MAC) and Materials Balance (MBA) programs had the Paradox Code Cleanup ATP run to check out the systems. This report describes the results of the test and provides the signoff sheets associated with the testing. The Acceptance Test results indicate that the MAC and MBA systems are ready for operation using the cleaned up code. The final codes were removed to the production space on the customer server on April 15th.

  4. Loss on Ignition Furnace Acceptance and Operability Test Procedure

    SciTech Connect

    JOHNSON, D.C.

    2000-06-01

    The purpose of this Acceptance Test Procedure and Operability Test Procedure (ATP/OTP)is to verify the operability of newly installed LOI equipment, including a model 1608FL CM{trademark} Furnace, a dessicator, and balance. The operability of the furnace will be verified. The arrangement of the equipment placed in Glovebox 157-3/4 to perform Loss on Ignition (LOI) testing on samples supplied from the Thermal Stabilization line will be verified. In addition to verifying proper operation of the furnace, this ATP/OTP will also verify the air flow through the filters, verify a damper setting to establish and maintain the required differential pressure between the glovebox and the room pressure, and test the integrity of the newly installed HEPA filter. In order to provide objective evidence of proper performance of the furnace, the furnace must heat 15 crucibles, mounted on a crucible rack, to 1000 C, according to a program entered into the furnace controller located outside the glovebox. The glovebox differential pressure will be set to provide the 0.5 to 2.0 inches of water (gauge) negative pressure inside the glovebox with an airflow of 100 to 125 cubic feet per minute (cfm) through the inlet filter. The glovebox inlet Glfilter will he flow tested to ensure the integrity of the filter connections and the efficiency of the filter medium. The newly installed windows and glovebox extension, as well as all disturbed joints, will be sonically tested via ultra probe to verify no leaks are present. The procedure for DOS testing of the filter is found in Appendix A.

  5. Loss on Ignition Furnace Acceptance and Operability Test Procedure

    SciTech Connect

    JOHNSTON, D.C.

    2000-08-23

    The purpose of this Acceptance Test Procedure and Operability Test Procedure (ATP/OTP)is to verify the operability of newly installed Loss on Ignition (LOI) equipment, including a model 1608FL CMTM Furnace, a dessicator, and balance. The operability of the furnace will be verified. The arrangement of the equipment placed in Glovebox 157-3/4 to perform LOI testing on samples supplied from the Thermal Stabilization line will be verified. In addition to verifying proper operation of the furnace, this ATP/OTP will also verify the air flow through the filters, verify a damper setting to establish and maintain the required differential pressure between the glovebox and the room pressure, and test the integrity of the newly installed HEPA filter. In order to provide objective evidence of proper performance of the furnace, the furnace must heat 15 crucibles, mounted on a crucible rack, to 1000 C, according to a program entered into the furnace controller located outside the glovebox. The glovebox differential pressure will be set to provide the 0.5 to 2.0 inches of water (gauge) negative pressure inside the glovebox with an expected airflow of 100 to 125 cubic feet per minute (cfm) through the inlet filter. The glovebox inlet G1 filter will be flow tested to ensure the integrity of the filter connections and the efficiency of the filter medium. The newly installed windows and glovebox extension, as well as all disturbed joints, will be sonically tested via ultra probe to verify no leaks are present. The procedure for DOS testing of the filter is found in Appendix A.

  6. Acceptance test procedure for Project W-049H

    SciTech Connect

    Buckles, D.I.

    1994-09-29

    The Acceptance Test Procedure (ATP) program for Project W-049H (200 Area Treated Effluent Disposal Facility [TEDF]) covers three activities as follows: (1) Disposal System; (2) Collection System; and (3) Instrumentation and Control System. Each activity has its own ATP. The purpose of the ATPs is to reverify that the systems have been constructed in accordance with the construction documents and to demonstrate that the systems function as required by the Project criteria. The Disposal System ATP covers the testing of the following: disposal line flowmeters, room air temperatures in the Disposal Station Sampling Building, effluent valves and position indicators, disposal pond level monitors, automated sampler, pressure relief valves, and overflow diversion sluice gates. The Collection System ATP covers the testing of the two pump stations and all equipment installed therein. The Instrumentation and Control (I and C) ATP covers the testing of the entire TEDF I and C system. This includes 3 OCS units, modem, and GPLI cabinets in the ETC control room; 2 pump stations; disposal station sampling building; and all LCUs installed in the field.

  7. W-026 acceptance test report system integration equipment (SIE)(submittal {number_sign} 018.6.A)

    SciTech Connect

    Watson, T.L.

    1997-01-27

    Acceptance testing of the System Integration Equipment (SIE) at Hanford was performed in two stages. The first was inconclusive, and resulted in a number of findings. These finding. are summarized as part of this report. The second stage of testing addressed these findings, and performed full system testing per the approved test procedure. This report includes summaries of all testing, results and finding.. Although the SIE did not in some cases perform as required for plant operations, it did perform per the system specification. (These discrepancies were noted and are addressed elsewhere.) Following testing, the system was formaLLy accepted. Documentation of this acceptance is incLuded in this report.

  8. Standard-B hydrogen monitoring system acceptance test report

    SciTech Connect

    Tran, T.T.

    1994-09-08

    Test Engineering was supported by Tank Waste Remediation System Safety Programs Engineering Support in the performance of an Acceptance Test Procedure (ATP) to qualify the Standard Hydrogen Monitoring System (SHMS) cabinet installed on waste tank 241-SY-103. The June 7, 1994 ATP performance was controlled by West Waste Tank Farms work package 2W-94-322. The ATP was conducted following the final installation of a second Whittaker electro-chemical hydrogen monitoring cell. The cabinet had been sited on the waste tank two years earlier, but never connected to the exhaust vent header to monitor Tank 241-SY-103 vent header exhaust gases. The cabinet was then modified, to remove two undesirable solid state hydrogen monitors and install a second Whittaker electro-chemical hydrogen monitoring sensor and signal conditioning. The ATP was used to assure that the cabinet wiring and components were properly installed and labeled and that the two years without operation had not seriously damaged the installed equipment. Electrical and pneumatic tests were performed to assure system integrity.

  9. End User Acceptance - Requirements or Specifications, Certification, Testing

    NASA Technical Reports Server (NTRS)

    Jeevarajan, Judith

    2013-01-01

    NASA follows top level safety requirement of two-failure tolerance (t hree levels of controls or design for minimum risk) to all catastroph ic hazards in the design of safe li-ion batteries for space use. ? R igorous development testing at appropriate levels to credible offnominal conditions and review of test data. ? Implement robust design con trols based on test results and test again to confirm safety at the a ppropriate levels. ? Stringent testing of all (100%) flight batteries (from button cells to large batteries).

  10. Utility-Scale Power Tower Solar Systems: Performance Acceptance Test Guidelines

    SciTech Connect

    Kearney, D.

    2013-03-01

    The purpose of these Guidelines is to provide direction for conducting performance acceptance testing for large power tower solar systems that can yield results of a high level of accuracy consistent with good engineering knowledge and practice. The recommendations have been developed under a National Renewable Energy Laboratory (NREL) subcontract and reviewed by stakeholders representing concerned organizations and interests throughout the concentrating solar power (CSP) community. An earlier NREL report provided similar guidelines for parabolic trough systems. These Guidelines recommend certain methods, instrumentation, equipment operating requirements, and calculation methods. When tests are run in accordance with these Guidelines, we expect that the test results will yield a valid indication of the actual performance of the tested equipment. But these are only recommendations--to be carefully considered by the contractual parties involved in the Acceptance Tests--and we expect that modifications may be required to fit the particular characteristics of a specific project.

  11. DUAL ALKALI ACCEPTANCE TEST AT LOUISVILLE GAS AND ELECTRIC COMPANY; VOLUME II. APPENDICES D-F

    EPA Science Inventory

    The report gives results of the completed acceptance test series run on the dual alkali system serving Louisville Gas and Electric Company's Cane Run Unit 6 boiler. This volume (Volume II) contains a discussion of the analytical and sampling methods, quality assurance, and the ra...

  12. DUAL ALKALI ACCEPTANCE TEST AT LOUISVILLE GAS AND ELECTRIC COMPANY; VOLUME III. APPENDICES G-J

    EPA Science Inventory

    The report gives results of the completed acceptance test series run on the dual alkali system serving Louisville Gas and Electric Company's Cane Run Unit 6 boiler. This volume (Volume III) contains raw data gathered by Kenvirons, calculations, and computerized reduced data submi...

  13. High acceptance of an early dyslexia screening test involving genetic analyses in Germany.

    PubMed

    Wilcke, Arndt; Müller, Bent; Schaadt, Gesa; Kirsten, Holger; Boltze, Johannes

    2016-02-01

    Dyslexia is a developmental disorder characterized by severe problems in the acquisition of reading and writing skills. It has a strong neurobiological basis. Genetic influence is estimated at 50-70%. One of the central problems with dyslexia is its late diagnosis, normally not before the end of the 2nd grade, resulting in the loss of several years for early therapy. Currently, research is focusing on the development of early tests for dyslexia, which may be based on EEG and genetics. Our aim was to determine the acceptance of such a future test among parents. We conducted a representative survey in Germany with 1000 parents of children aged 3-7 years, with and without experience of dyslexia. 88.7% of the parents supported the introduction of an early test for dyslexia based on EEG and genetics; 82.8% would have their own children tested, and 57.9% were willing to pay for the test if health insurance did not cover the costs. Test acceptance was significantly higher if parents had prior experience with dyslexia. The perceived benefits of such a test were early recognition and remediation and, preventing deficits. Concerns regarded the precision of the test, its potentially stigmatizing effect and its costs. The high overall support for the test leads to the conclusion that parents would accept a test for dyslexia based on EEG and genetics. PMID:26036858

  14. Overcoming Denial through the Group: A Test of Acceptance Theory.

    ERIC Educational Resources Information Center

    Rugel, Robert P.; Barry, Denise

    1990-01-01

    Found participants (N=28) in alcohol treatment groups showed decreases in denial of drinking problems and decreases in psychopathology following 12 weeks of group counseling. Determined greater self-acceptance was associated with experiencing acceptance by group and with greater decreases in denial; decreases in denial and psychopathology were…

  15. Fatigue acceptance test limit criterion for larger diameter rolled thread fasteners

    SciTech Connect

    Kephart, A.R.

    1997-05-01

    This document describes a fatigue lifetime acceptance test criterion by which studs having rolled threads, larger than 1.0 inches in diameter, can be assured to meet minimum quality attributes associated with a controlled rolling process. This criterion is derived from a stress dependent, room temperature air fatigue database for test studs having a 0.625 inch diameter threads of Alloys X-750 HTH and direct aged 625. Anticipated fatigue lives of larger threads are based on thread root elastic stress concentration factors which increase with increasing thread diameters. Over the thread size range of interest, a 30% increase in notch stress is equivalent to a factor of five (5X) reduction in fatigue life. The resulting diameter dependent fatigue acceptance criterion is normalized to the aerospace rolled thread acceptance standards for a 1.0 inch diameter, 0.125 inch pitch, Unified National thread with a controlled Root radius (UNR). Testing was conducted at a stress of 50% of the minimum specified material ultimate strength, 80 Ksi, and at a stress ratio (R) of 0.10. Limited test data for fastener diameters of 1.00 to 2.25 inches are compared to the acceptance criterion. Sensitivity of fatigue life of threads to test nut geometry variables was also shown to be dependent on notch stress conditions. Bearing surface concavity of the compression nuts and thread flank contact mismatch conditions can significantly affect the fastener fatigue life. Without improved controls these conditions could potentially provide misleading acceptance data. Alternate test nut geometry features are described and implemented in the rolled thread stud specification, MIL-DTL-24789(SH), to mitigate the potential effects on fatigue acceptance data.

  16. Acceptance test procedure for the 105-KW isolation barrier leak rate

    SciTech Connect

    McCracken, K.J.

    1995-05-19

    This acceptance test procedure shall be used to: First establish a basin water loss rate prior to installation of the two isolation barriers between the main basin and the discharge chute in K-Basin West. Second, perform an acceptance test to verify an acceptable leakage rate through the barrier seals. This Acceptance Test Procedure (ATP) has been prepared in accordance with CM-6-1 EP 4.2, Standard Engineering Practices.

  17. Misleading biochemical laboratory test results

    PubMed Central

    Nanji, Amin A.

    1984-01-01

    This article reviews the general and specific factors that interfere with the performance of common biochemical laboratory tests and the interpretation of their results. The clinical status of the patient, drug interactions, and in-vivo and in-vitro biochemical interactions and changes may alter the results obtained from biochemical analysis of blood constituents. Failure to recognize invalid laboratory test results may lead to injudicious and dangerous management of patients. PMID:6375845

  18. MITG test procedure and results

    SciTech Connect

    Eck, M.B.; Mukunda, M.

    1983-01-01

    Elements and modules for Radioisotope Thermoelectric Generator have been performance tested since the inception of the RTG program. These test articles seldom resembled flight hardware and often lacked adequate diagnostic instrumentation. Because of this, performance problems were not identified in the early stage of program development. The lack of test data in an unexpected area often hampered the development of a problem solution. A procedure for conducting the MITG Test was developed in an effort to obtain data in a systematic, unambiguous manner. This procedure required the development of extensive data acquisition software and test automation. The development of a facility to implement the test procedure, the facility hardware and software requirements, and the results of the MITG testing are the subject of this paper.

  19. ["Fitness for public service" - results of standardised acceptance examinations].

    PubMed

    Arndt, K- H; Roth, M

    2002-01-01

    From Nov. 1 1990 to Dec. 31 2001 4928 applicants (61 % female, 39 % male) were examined, totalling 6580 pre-employment examinations, to decide whether they fulfilled the health requirement criteria for civil servants. Standardised aptitude criteria were used, career-specific requirements taken into account. To exclude with a high probability were any risks of premature disability for service or frequent disorders. In 394 cases (= 5.99 %) the results were negative. This assessment was final in 298 cases (= 4.53 % of all examinations) or was confirmed negative in repeated examinations even after special conditions had been imposed. Main reasons for disqualification were second- and third-degree adipositas with additional risk factors or a metabolic syndrome, chronic cardio-vascular and metabolic diseases requiring permanent treatment, malignant neoplasms or non-fulfilment of the criteria for special careers. The comparatively high rate of disqualification is mainly due to the high average age of the applicants examined (40 % of all applicants were over 40, 13 % were older than 50). Purpose, sensitivity and specifics of such examinations are discussed. Taking into consideration the high rate of civil servants prematurely unfit for work, such pre-employment examinations are regarded as highly justified. Moreover, it is necessary to have clear guidelines, aptitude criteria and examination procedures for individual careers. It is also important to adhere strictly to local responsibility for pre-employment examinations. PMID:12221615

  20. State Test Results Are Predictable

    ERIC Educational Resources Information Center

    Tienken, Christopher H.

    2014-01-01

    Out-of-school, community demographic and family-level variables have an important influence on student achievement as measured by large-scale standardized tests. Studies described here demonstrated that about half of the test score is accounted for by variables outside the control of teachers and school administrators. The results from these…

  1. 46 CFR 54.05-17 - Weld toughness test acceptance criteria.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... PRESSURE VESSELS Toughness Tests § 54.05-17 Weld toughness test acceptance criteria. (a) For Charpy V-notch impact tests the energy absorbed in both the weld metal and heat affected zone impact tests in weld... 46 Shipping 2 2012-10-01 2012-10-01 false Weld toughness test acceptance criteria....

  2. 46 CFR 54.05-17 - Weld toughness test acceptance criteria.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... PRESSURE VESSELS Toughness Tests § 54.05-17 Weld toughness test acceptance criteria. (a) For Charpy V-notch impact tests the energy absorbed in both the weld metal and heat affected zone impact tests in weld... 46 Shipping 2 2014-10-01 2014-10-01 false Weld toughness test acceptance criteria....

  3. 46 CFR 54.05-17 - Weld toughness test acceptance criteria.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... PRESSURE VESSELS Toughness Tests § 54.05-17 Weld toughness test acceptance criteria. (a) For Charpy V-notch impact tests the energy absorbed in both the weld metal and heat affected zone impact tests in weld... 46 Shipping 2 2013-10-01 2013-10-01 false Weld toughness test acceptance criteria....

  4. Development of Performance Acceptance Test Guidelines for Large Commercial Parabolic Trough Solar Fields: Preprint

    SciTech Connect

    Kearney, D.; Mehos, M.

    2010-12-01

    Prior to commercial operation, large solar systems in utility-size power plants need to pass a performance acceptance test conducted by the EPC contractor or owners. In lieu of the present absence of engineering code developed for this purpose, NREL has undertaken the development of interim guidelines to provide recommendations for test procedures that can yield results of a high level of accuracy consistent with good engineering knowledge and practice. The fundamental differences between acceptance of a solar power plant and a conventional fossil-fired plant are the transient nature of the energy source and the necessity to utilize an analytical performance model in the acceptance process. These factors bring into play the need to establish methods to measure steady state performance, potential impacts of transient processes, comparison to performance model results, and the possible requirement to test, or model, multi-day performance within the scope of the acceptance test procedure. The power block and BOP are not within the boundaries of this guideline. The current guideline is restricted to the solar thermal performance of parabolic trough systems and has been critiqued by a broad range of stakeholders in CSP development and technology.

  5. Peer Acceptance and the Development of Emotional and Behavioural Problems: Results from a Preventive Intervention Study

    ERIC Educational Resources Information Center

    Menting, Barbara; Koot, Hans; van Lier, Pol

    2015-01-01

    Difficulties in peer acceptance during elementary school have been associated with emotional and behavioural problems. This study used a randomized controlled intervention design to test whether improvements in peer acceptance mediated reduced rates of emotional and behavioural problems in intervention compared to control-group children. A total…

  6. Test report for run-in acceptance testing of hydrogen mitigation test pump-2

    SciTech Connect

    Brewer, A.K.; Kolowith, R.

    1995-01-01

    This document provides the results of the run-in test of the replacement mixer pump for the Tank 241-SY-101. The test was conducted at the 400 Area MASF facility between August 12 and September 29, 1994. The report includes findings, analysis, recommendations, and corrective actions taken.

  7. 49 CFR 232.505 - Pre-revenue service acceptance testing plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Pre-revenue service acceptance testing plan. 232... § 232.505 Pre-revenue service acceptance testing plan. (a) General; submission of plan. Except as... its system the operating railroad or railroads shall submit a pre-revenue service acceptance...

  8. Results of an emergency response atmospheric dispersion model comparison using a state accepted statistical protocol

    SciTech Connect

    Ciolek, J.T. Jr.

    1993-10-01

    The Rocky Flats Plant, located approximately 26 km northwest of downtown Denver, Colorado, has developed an emergency response atmospheric dispersion model for complex terrain applications. Plant personnel would use the model, known as the Terrain-Responsive Atmospheric Code (TRAC) (Hodgin 1985) to project plume impacts and provide off-site protective action recommendations to the State of Colorado should a hazardous material release occur from the facility. The Colorado Department of Health (CDH) entered into an interagency agreement with the Rocky Flats Plant prime contractor, EG&G Rocky Flats, and the US Department of Energy to evaluate TRAC as an acceptable emergency response tool. After exhaustive research of similar evaluation processes from other emergency response and regulatory organizations, the interagency committee devised a formal acceptance process. The process contains an evaluation protocol (Hodgin and Smith 1992), descriptions of responsibilities, an identified experimental data set to use in the evaluation, and judgment criteria for model acceptance. The evaluation protocol is general enough to allow for different implementations. This paper explains one implementation, shows protocol results for a test case, and presents results of a comparison between versions of TRAC with different wind Field codes: a two dimensional mass consistent code called WINDS (Fosberg et al. 1976) that has been extended to three dimensions, and a fully 3 dimensional mass conserving code called NUATMOS (Ross and Smith 1987, Ross et al. 1988).

  9. Acceptance test procedure for K basins dose reduction project clean and coat equipment

    SciTech Connect

    Creed, R.F.

    1996-03-11

    This document is the Acceptance Test Procedure (ATP) for the clean and coat equipment designed by Oceaneering Hanford, Inc. under purchase order MDK-XVC-406988 for use in the 105 K East Basin. The ATP provides the guidelines and criteria to test the equipment`s ability to clean and coat the concrete perimeter, divider walls, and dummy elevator pit above the existing water level. This equipment was designed and built in support of the Spent Nuclear Fuel, Dose Reduction Project. The ATP will be performed at the 305 test facility in the 300 Area at Hanford. The test results will be documented in WHC-SD-SNF-ATR-020.

  10. Site Testing Results and Automation

    NASA Astrophysics Data System (ADS)

    Ashley, Michael M.; Storey, John W.; Burton, Michael G.

    NOTE: this is highly preliminary just to get the abstract in by the deadline! - brief summary of the AASTO program - key points from the site testing results at South Pole - very brief introduction to ICECAM and the AASTINO - key results from ICECAM and the AASTINO instruments - next year's instrument plans at South Pole and Dome C including a brief mention of Doug Caldwell's experiment

  11. Low Emissions RQL Flametube Combustor Test Results

    NASA Technical Reports Server (NTRS)

    Chang, Clarence T.; Holdeman, James D.

    2001-01-01

    The overall objective of this test program was to demonstrate and evaluate the capability of the Rich-burn/Quick-mix/Lean-burn (RQL) combustor concept for HSR applications. This test program was in support of the Pratt & Whitney and GE Aircraft Engines HSR low-NOx Combustor Program. Collaborative programs with Parker Hannifin Corporation and Textron Fuel Systems resulted in the development and testing of the high-flow low-NOx rich-burn zone fuel-to-air ratio research fuel nozzles used in this test program. Based on the results obtained in this test program, several conclusions can be made: (1) The RQL tests gave low NOx and CO emissions results at conditions corresponding to HSR cruise. (2) The Textron fuel nozzle design with optimal multiple partitioning of fuel and air circuits shows potential of providing an acceptable uniform local fuel-rich region in the rich burner. (3) For the parameters studied in this test series, the tests have shown T3 is the dominant factor in the NOx formation for RQL combustors. As T3 increases from 600 to 1100 F, EI(NOx) increases approximately three fold. (4) Factors which appear to have secondary influence on NOx formation are P4, T4, infinity(sub rb), V(sub ref,ov). (5) Low smoke numbers were measured for infinity(sub rb) of 2.0 at P4 of 120 psia.

  12. NEXT Single String Integration Test Results

    NASA Technical Reports Server (NTRS)

    Soulas, George C.; Patterson, Michael J.; Pinero, Luis; Herman, Daniel A.; Snyder, Steven John

    2010-01-01

    As a critical part of NASA's Evolutionary Xenon Thruster (NEXT) test validation process, a single string integration test was performed on the NEXT ion propulsion system. The objectives of this test were to verify that an integrated system of major NEXT ion propulsion system elements meets project requirements, to demonstrate that the integrated system is functional across the entire power processor and xenon propellant management system input ranges, and to demonstrate to potential users that the NEXT propulsion system is ready for transition to flight. Propulsion system elements included in this system integration test were an engineering model ion thruster, an engineering model propellant management system, an engineering model power processor unit, and a digital control interface unit simulator that acted as a test console. Project requirements that were verified during this system integration test included individual element requirements ; integrated system requirements, and fault handling. This paper will present the results of these tests, which include: integrated ion propulsion system demonstrations of performance, functionality and fault handling; a thruster re-performance acceptance test to establish baseline performance: a risk-reduction PMS-thruster integration test: and propellant management system calibration checks.

  13. Mobile evaporator corrosion test results

    SciTech Connect

    Rozeveld, A.; Chamberlain, D.B.

    1997-05-01

    Laboratory corrosion tests were conducted on eight candidates to select a durable and cost-effective alloy for use in mobile evaporators to process radioactive waste solutions. Based on an extensive literature survey of corrosion data, three stainless steel alloys (304L, 316L, AL-6XN), four nickel-based alloys (825, 625, 690, G-30), and titanium were selected for testing. The corrosion tests included vapor phase, liquid junction (interface), liquid immersion, and crevice corrosion tests on plain and welded samples of candidate materials. Tests were conducted at 80{degrees}C for 45 days in two different test solutions: a nitric acid solution. to simulate evaporator conditions during the processing of the cesium ion-exchange eluant and a highly alkaline sodium hydroxide solution to simulate the composition of Tank 241-AW-101 during evaporation. All of the alloys exhibited excellent corrosion resistance in the alkaline test solution. Corrosion rates were very low and localized corrosion was not observed. Results from the nitric acid tests showed that only 316L stainless steel did not meet our performance criteria. The 316L welded interface and crevice specimens had rates of 22.2 mpy and 21.8 mpy, respectively, which exceeds the maximum corrosion rate of 20 mpy. The other welded samples had about the same corrosion resistance as the plain samples. None of the welded samples showed preferential weld or heat-affected zone (HAZ) attack. Vapor corrosion was negligible for all alloys. All of the alloys except 316L exhibited either {open_quotes}satisfactory{close_quotes} (2-20 mpy) or {open_quotes}excellent{close_quotes} (<2 mpy) corrosion resistance as defined by National Association of Corrosion Engineers. However, many of the alloys experienced intergranular corrosion in the nitric acid test solution, which could indicate a susceptibility to stress corrosion cracking (SCC) in this environment.

  14. Thermocouple module halt acceptance test report for tank 241-SY-101 DACS-1

    SciTech Connect

    Larsen, D.C.

    1998-03-10

    Testing was started on February 24, 1998 and completed on February 25, 1998. The completed procedure consists of 4 acceptance test sections, 6.1 through 6.4. Three test exceptions were identified during the procedure. The first test exception was determined to be unrelated to the ATP and unfortunate that the instrument failed during the ATP. The next two test exceptions were disposition as acceptable because the alarming functions worked correctly in identifying a problem when software communications were interrupted. The test was completed satisfactorily over 2 days. The remainder of the acceptance test report is the completed test procedure.

  15. Modeling of a Parabolic Trough Solar Field for Acceptance Testing: A Case Study

    SciTech Connect

    Wagner, M. J.; Mehos, M. S.; Kearney, D. W.; McMahan, A. C.

    2011-01-01

    As deployment of parabolic trough concentrating solar power (CSP) systems ramps up, the need for reliable and robust performance acceptance test guidelines for the solar field is also amplified. Project owners and/or EPC contractors often require extensive solar field performance testing as part of the plant commissioning process in order to ensure that actual solar field performance satisfies both technical specifications and performance guaranties between the involved parties. Performance test code work is currently underway at the National Renewable Energy Laboratory (NREL) in collaboration with the SolarPACES Task-I activity, and within the ASME PTC-52 committee. One important aspect of acceptance testing is the selection of a robust technology performance model. NREL1 has developed a detailed parabolic trough performance model within the SAM software tool. This model is capable of predicting solar field, sub-system, and component performance. It has further been modified for this work to support calculation at subhourly time steps. This paper presents the methodology and results of a case study comparing actual performance data for a parabolic trough solar field to the predicted results using the modified SAM trough model. Due to data limitations, the methodology is applied to a single collector loop, though it applies to larger subfields and entire solar fields. Special consideration is provided for the model formulation, improvements to the model formulation based on comparison with the collected data, and uncertainty associated with the measured data. Additionally, this paper identifies modeling considerations that are of particular importance in the solar field acceptance testing process and uses the model to provide preliminary recommendations regarding acceptable steady-state testing conditions at the single-loop level.

  16. 78 FR 53484 - Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 4

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-29

    ... COMMISSION Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 4... acceptance criteria (ITAAC) completion. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) staff has... acceptance criteria are met for ITAAC E.2.5.04.05.05.02, for the Vogtle Electric Generating Plant, Unit...

  17. 78 FR 53483 - Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 3

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-29

    ... COMMISSION Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 3... acceptance criteria (ITAAC) completion. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) staff has... acceptance criteria are met for ITAAC E.2.5.04.05.05.02, for the Vogtle Electric Generating Plant, Unit...

  18. 46 CFR 54.05-17 - Weld toughness test acceptance criteria.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Weld toughness test acceptance criteria. 54.05-17 Section 54.05-17 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PRESSURE VESSELS Toughness Tests § 54.05-17 Weld toughness test acceptance criteria. (a) For Charpy...

  19. 46 CFR 54.05-17 - Weld toughness test acceptance criteria.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 2 2011-10-01 2011-10-01 false Weld toughness test acceptance criteria. 54.05-17 Section 54.05-17 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PRESSURE VESSELS Toughness Tests § 54.05-17 Weld toughness test acceptance criteria. (a) For Charpy...

  20. PDSS/IMC qualification test software acceptance procedures

    NASA Technical Reports Server (NTRS)

    1984-01-01

    Tests to be performed for qualifying the payload development support system image motion compensator (IMC) are identified. The performance of these tests will verify the IMC interfaces and thereby verify the qualification test software.

  1. AXAF hypervelocity impact test results

    NASA Technical Reports Server (NTRS)

    Frost, Cynthia L.; Rodriguez, Pedro I.

    1997-01-01

    Composite and honeycomb panels are commonly used for spacecraft structural components. The impact test results and analysis of six different composite and honeycomb combinations for use on the advanced X-ray astrophysics facility (AXAF) are reported. The AXAF consists of an X-ray telescope and the associated detecting devices attached to an octagonal spacecraft with an internal propulsion system. The spacecraft's structural panels and optical bench are made of two different graphite fiber reinforced polyimides or composite panels bonded to either side of an aluminum honeycomb. The instrument is required to have at least a 0.92 probability of no failure of any of the critical elements due to meteoroids and debris. In relation to the no-failure probability determination in its low earth orbit environment, hypervelocity impact testing was performed to determine the ballistic limit range and the extent of damage due to impact. The test results for a power and signal cable bundle located behind a panel are presented. Tests planned for a multilayer insulation (MLI) blanket and four types of cable bundles are discussed.

  2. Cryogenic Brush Seal Test Results

    NASA Technical Reports Server (NTRS)

    Proctor, Margaret P.; Walker, James F.

    1996-01-01

    Brush seals are compliant, contact seals that have long-life, low-leakage characteristics desirable for use in rocket engine turbopumps. 50.8-mm (2.0 inch) diameter brush seals with a nominal initial radial interference of 0.127-mm (0.005 inch) were tested in liquid nitrogen at shaft speeds up to 35,000 rpm and differential pressure loads up to 1.21 MPa (175 psi) per brush. The measured leakage rate of a single brush was 2-3 times less than that measured for a 12-tooth, 0.127-mm (0.005 inch) radial clearance labyrinth seal used as a baseline. Stage effects were studied and it was found that two brush seals with a large separation distance leaked less than two brushes tightly packed together. The maximum measured groove depth on the Inconel 718 rotor was 25.4 (mu)m (0.001 inch) after 4.31 hours of shaft rotation. The Haynes-25 bristles wore approximately 25.4-76.2 (mu)m (0.001-0.003 inch) under the same conditions. Three seal runner coatings, chromium carbide, Teflon impregnated chromium, and zirconium oxide, were tested in liquid hydrogen at 35,000 and 65,000 rpm with separate 50.8 mm diameter brush seals made of Haynes-25 bristles and having a nominal initial radial interference of 129 rpm. Two bare Inconel-718 rotors were also tested as a baseline. The test results revealed significant differences between the wear characteristics of the uncoated and coated seal runners. At both speeds the brush seal with the bare Inconel-718 seal runner exhibited significant bristle wear with excessive material transferring to the runner surface. In contrast, the coated seal runners inhibited the transfer and deposit of bristle material. The chromium carbide coating showed only small quantities of bristle material transferring to its surface. The Teflon impregnated chromium coating also inhibited material transfer and provided some lubrication. This coating, however, is self-sacrificing. The Teflon remained present on the low speed runner, but it was completely removed from the

  3. RSG Deployment Case Testing Results

    SciTech Connect

    Owsley, Stanley L.; Dodson, Michael G.; Hatchell, Brian K.; Seim, Thomas A.; Alexander, David L.; Hawthorne, Woodrow T.

    2005-09-01

    The RSG deployment case design is centered on taking the RSG system and producing a transport case that houses the RSG in a safe and controlled manner for transport. The transport case was driven by two conflicting constraints, first that the case be as light as possible, and second that it meet a stringent list of Military Specified requirements. The design team worked to extract every bit of weight from the design while striving to meet the rigorous Mil-Spec constraints. In the end compromises were made primarily on the specification side to control the overall weight of the transport case. This report outlines the case testing results.

  4. Global Health Diplomacy, Monitoring & Evaluation, and the Importance of Quality Assurance & Control: Findings from NIMH Project Accept (HPTN 043): A Phase III Randomized Controlled Trial of Community Mobilization, Mobile Testing, Same-Day Results, and Post-Test Support for HIV in Sub-Saharan Africa and Thailand

    PubMed Central

    Kevany, Sebastian; Khumalo-Sakutukwa, Gertrude; Singh, Basant; Chingono, Alfred; Morin, Stephen

    2016-01-01

    Background Provision and scale-up of high quality, evidence-based services is essential for successful international HIV prevention interventions in order to generate and maintain intervention uptake, study integrity and participant trust, from both health service delivery and diplomatic perspectives. Methods We developed quality assurance (QAC) procedures to evaluate staff fidelity to a cluster-randomized trial of the NIMH Project Accept (HPTN 043) assessing the effectiveness of a community-based voluntary counseling and testing strategy. The intervention was comprised of three components—Mobile Voluntary Counseling and Testing (MVCT), Community Mobilization (CM) and Post-Test Support Services (PTSS). QAC procedures were based on standardized criteria, and were designed to assess both provider skills and adherence to the intervention protocol. Supervisors observed a random sample of 5% to 10% of sessions each month and evaluated staff against multiple criteria on scales of 1–5. A score of 5 indicated 100% adherence, 4 indicated 95% adherence, and 3 indicated 90% adherence. Scores below 3 were considered unsatisfactory, and protocol deviations were discussed with the respective staff. Results During the first year of the intervention, the mean scores of MVCT and CM staff across the 5 study sites were 4 (95% adherence) or greater and continued to improve over time. Mean QAC scores for the PTSS component were lower and displayed greater fluctuations. Challenges to PTSS staff were identified as coping with the wide range of activities in the PTSS component and the novelty of the PTSS process. QAC fluctuations for PTSS were also associated with new staff hires or changes in staff responsibilities. Through constant staff monitoring and support, by Year 2, QAC scores for PTSS activities had reached those of MVCT and CM. Conclusions The implementation of a large-sale, evidence based HIV intervention requires extensive QAC to ensure implementation effectiveness

  5. Diagnostic Tests and Examination Results.

    ERIC Educational Resources Information Center

    Barker, Dennis

    1988-01-01

    A study of the usefulness of several diagnostic tests for selecting students to enter a civil engineering program found that the tests were not appropriate and that tests should be developed specifically for civil engineering. (MSE)

  6. 49 CFR 238.111 - Pre-revenue service acceptance testing plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Pre-revenue service acceptance testing plan. 238... and General Requirements § 238.111 Pre-revenue service acceptance testing plan. (a) Passenger equipment that has previously been used in revenue service in the United States. For passenger...

  7. 49 CFR 238.111 - Pre-revenue service acceptance testing plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Pre-revenue service acceptance testing plan. 238.111 Section 238.111 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL... and General Requirements § 238.111 Pre-revenue service acceptance testing plan. (a)...

  8. 78 FR 65007 - Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 3

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-30

    ...The U.S. Nuclear Regulatory Commission (NRC) staff has determined that the inspections, tests, and analyses have been successfully completed, and that the specified acceptance criteria are met for Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC), 2.1.03.11 for the Vogtle Electric Generating Plant, Unit...

  9. Project B610 process control configuration acceptance test report

    SciTech Connect

    Silvan, G.R.

    1995-06-27

    The purpose of this test is to verify the Westinghouse configuration of the MICON A/S Distributed Control System for project B610. The following will be verified: (1) proper assignment and operation of all field inputs to and outputs from the MICON Termination panels; (2) proper operation of all display data on the operators` console; (3) proper operation of all required alarms; and (4) proper operation of all required interlocks. This test only verifies the proper operation of the Westinghouse control configuration (or program). It will not be responsible for verifying proper operation of the MICON hardware or operating software. Neither does it test any of the B610 instrument. The MICON hardware and software has been tested as part of the equipment procurement. Instrumentation and wiring installed under project B620 will be tested under a separate functional test. In some cases, precise transmitter ranges, alarm setpoints, and controller tuning parameters are not available at this time. Therefore, approximate values are used during the test. This should not affect the proper operation of the configuration or the validity of this test. Final values will be assigned during operability testing.

  10. 46 CFR 164.023-11 - Acceptance tests.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... identification tests are conducted: (1) The average length/weight ratio of the thread in meters per kilogram... analysis, thermogravimetric analysis, differential scanning calorimeter, or other equivalent means...

  11. Tank Monitoring and Control System (TMACS) Acceptance Test Procedure

    SciTech Connect

    BARNES, D.A.

    2000-06-01

    The purpose of this document is to describe tests performed to validate Revision 12.0 of the TMACS Monitor and Control System (TMACS) and verify that the software functions as intended by design. This document is intended to test the software portion of TMACS. The tests will be performed on the development system. The software to be tested is the TMACS knowledge bases (KB) and the I/O driver/services. The development system will not be communicating to field equipment; instead, the field equipment is simulated using emulators or multiplexers in the lab.

  12. Acceptance Test Procedure for New Pumping and Instrumentation Control Skid N

    SciTech Connect

    KOCH, M.R.

    1999-12-13

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''N''. The ATP will be performed after the construction of the PIC skid in the shop.

  13. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid Q

    SciTech Connect

    KOCH, M.R.

    2000-03-27

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''Q''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  14. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid W

    SciTech Connect

    KOCH, M.R.

    2000-05-18

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''W''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  15. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid T

    SciTech Connect

    KOCH, M.R.

    2000-05-18

    This Acceptance Test Procedure (ATP) provides for the inspection and testing Of the new Pumping Instrumentation and Control (PIC) skid designed as ''T''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  16. Acceptance Test Procedure for New Pumping and Instrumentation Control Skid L

    SciTech Connect

    KOCH, M.R.

    1999-10-11

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''L''. The ATP will be performed after the construction of the PIC skid in the shop.

  17. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid U

    SciTech Connect

    KOCH, M.R.

    2000-12-05

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''U''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  18. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid R

    SciTech Connect

    KOCH, M.R.

    2000-05-11

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''R''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  19. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid V

    SciTech Connect

    KOCH, M.R.

    2000-05-18

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control. (PIC) skid designed as ''V''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  20. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid T

    SciTech Connect

    KOCH, M.R.

    2000-06-20

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designated as ''T''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  1. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid P

    SciTech Connect

    KOCH, M.R.

    2000-03-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''P''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  2. Retrofit and acceptance test of 30-cm ion thrusters

    NASA Technical Reports Server (NTRS)

    Poeschel, R. L.

    1981-01-01

    Six 30 cm mercury thrusters were modified to the J-series design and evaluated using standardized test procedures. The thruster performance meets the design objectives (lifetime objective requires verification), and documentation (drawings, etc.) for the design is completed and upgraded. The retrofit modifications are described and the test data for the modifications are presented and discussed.

  3. 10 CFR 36.41 - Construction monitoring and acceptance testing.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... operation of the over-the-pool monitor, alarms, and interlocks required by § 36.29(b). (f) Source rack. For panoramic irradiators, the licensee shall test the movement of the source racks for proper operation prior to source loading; testing must include source rack lowering due to simulated loss of power. For...

  4. Geoscience Laser Altimeter System (GLAS) Instrument: Flight Loop Heat Pipe (LHP) Acceptance Thermal Vacuum Test

    NASA Technical Reports Server (NTRS)

    Baker, Charles; Butler, Dan; Ku, Jentung; Grob, Eric; Swanson, Ted; Nikitkin, Michael; Powers, Edward I. (Technical Monitor)

    2001-01-01

    Two loop heat pipes (LHPs) are to be used for tight thermal control of the Geoscience Laser Altimeter System (GLAS) instrument, planned for flight in late 2001. The LHPs are charged with Propylene as a working fluid. One LHP will be used to transport 110 W from a laser to a radiator, the other will transport 160 W from electronic boxes to a separate radiator. The application includes a large amount of thermal mass in each LHP system and low initial startup powers. The initial design had some non-ideal flight design compromises, resulted in a less than ideal charge level for this design concept with a symmetrical secondary wick. This less than ideal charge was identified as the source of inadequate performance of the flight LHPs during the flight thermal vacuum test in October of 2000. We modified the compensation chamber design, re-built and charged the LHPs for a final LHP acceptance thermal vacuum test. This test performed March of 2001 was 100% successful. This is the last testing to be performed on the LHPs prior to instrument thermal vacuum test. This sensitivity to charge level was shown through varying the charge on a Development Model Loop Heat Pipe (DM LHP) and evaluating performance at various fill levels. At lower fills similar to the original charge in the flight units, the same poor performance was observed. When the flight units were re-designed and filled to the levels similar to the initial successful DM LHP test, the flight units also successfully fulfilled all requirements. This final flight Acceptance test assessed performance with respect to startup, low power operation, conductance, and control heater power, and steady state control. The results of the testing showed that both LHPs operated within specification. Startup on one of the LHPs was better than the other LHP because of the starter heater placement and a difference in evaporator design. These differences resulted in a variation in the achieved superheat prior to startup. The LHP with

  5. Waste retrieval sluicing system data acquisition system acceptance test report

    SciTech Connect

    Bevins, R.R.

    1998-07-31

    This document describes the test procedure for the Project W-320 Tank C-106 Sluicing Data Acquisition System (W-320 DAS). The Software Test portion will test items identified in the WRSS DAS System Description (SD), HNF-2115. Traceability to HNF-2115 will be via a reference that follows in parenthesis, after the test section title. The Field Test portion will test sensor operability, analog to digital conversion, and alarm setpoints for field instrumentation. The W-320 DAS supplies data to assist thermal modeling of tanks 241-C-106 and 241-AY-102. It is designed to be a central repository for information from sources that would otherwise have to be read, recorded, and integrated manually. Thus, completion of the DAS requires communication with several different data collection devices and output to a usable PC data formats. This test procedure will demonstrate that the DAS functions as required by the project requirements stated in Section 3 of the W-320 DAS System Description, HNF-2115.

  6. Tank Monitoring and Control Sys (TMACS) Acceptance Test Procedure

    SciTech Connect

    WANDLING, R.R.

    1999-11-08

    The purpose of this document is to describe tests performed to validate Revision 11.2 of the TMACS Monitor and Control System (TMCACS) and verify that the software functions as intended by design. The tests will be performed on the development system. The software to be tested is the TMACS knowledge bases (KB) and the I/O driver/services. The development system will not be talking to field equipment; instead, the field equipment is simulated using emulators or multiplexers in the lab.

  7. MAC mini acceptance test procedure, software Version 3.0

    SciTech Connect

    Russell, V.K.

    1994-10-17

    The K Basins Materials Accounting (MAC) programs had some major improvements made to it to organize the main-tables by Location, Canister, and Material. This ATP describes how the code was to be tested to verify its correctness.

  8. Redstone Test Stand Accepted Into National Register of Historical Places

    NASA Technical Reports Server (NTRS)

    1976-01-01

    On October 02, 1976, Marshall Space Flight Center's (MSFC) Redstone test stand was received into the National Registry of Historical Places. Photographed in front of the Redstone test stand along with their wives are (left to right), Madison County Commission Chairman James Record, Dr. William R. Lucas, MSFC Center Director from June 15, 1974 until July 3, 1986, (holding certificate), Ed, Buckbee, Space and Rocket Center Director; Harvie Jones, Huntsville Architect; Dick Smith; and Joe Jones.

  9. Test Results for CSTR Test 3

    SciTech Connect

    Lee, D.D.

    2000-10-12

    The goal of the Savannah River Salt Waste Processing Program (SPP) is to evaluate and select the most effective technology for the treatment of the high-level waste salt solutions currently being stored in underground storage tanks at the U.S. Department of Energy Savannah River Site (SRS) in Aiken, South Carolina. One of the three technologies currently being developed for this application is the Small-Tank Tetraphenylborate Process (STTP). This process uses sodium tetraphenylborate (NaTPB) to precipitate and remove radioactive cesium from the waste and monosodium titanate (MST) to sorb and remove radioactive strontium and actinides. Oak Ridge National Laboratory is demonstrating this process at the 1:4000 scale using a 20-L capacity continuous-flow stirred-tank reactor (CSTR) system. Since March 1999, three operating campaigns of the 20-L CSTR have been conducted. The ultimate goal is to verify that this process, under certain extremes of operating conditions, can meet the minimum treatment criteria necessary for processing and disposal at the Savannah River Saltstone Facility. The waste acceptance criteria (WAC) for {sup 137}Cs, {sup 90}Sr, and total actinides are <40 nCi/g, <40 nCi/g, and <18 nCi/g, respectively. However, to allow for changes in process conditions, SPP is seeking a level of treatment that is about 50% of the WAC. The bounding separation goals for {sup 137}Cs and {sup 90}Sr are to obtain decontamination factors (DFs) of 40,000 (99.998% removal) and 26 (96.15% removal), respectively. The DF is defined as the concentration of contaminant in the waste divided by the concentration of contaminant in the effluent stream.

  10. 10 CFR 36.41 - Construction monitoring and acceptance testing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    .... The licensee shall test the operability of the fire extinguishing system. (i) Source return. For...) Water handling system. For pool irradiators, the licensee shall verify that the water purification system, the conductivity meter, and the water level indicators operate properly. (e) Radiation...

  11. 10 CFR 36.41 - Construction monitoring and acceptance testing.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    .... The licensee shall test the operability of the fire extinguishing system. (i) Source return. For...) Water handling system. For pool irradiators, the licensee shall verify that the water purification system, the conductivity meter, and the water level indicators operate properly. (e) Radiation...

  12. MAC mini acceptance test procedures, software Version 3.3

    SciTech Connect

    Russell, V.K.

    1994-10-17

    The K Basins Materials Accounting (MAC) programs had some improvements made to it to to change slightly the access authorized users had to the modification of critical data. This ATP describes how the code was to be tested to verify its correctness.

  13. 10 CFR 36.41 - Construction monitoring and acceptance testing.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... it functions as designed and that all alarms, controls, and interlocks work properly. (h) Fire protection. For panoramic irradiators, the licensee shall test the ability of the heat and smoke detectors to detect a fire, to activate alarms, and to cause the source rack to automatically become fully...

  14. 10 CFR 36.41 - Construction monitoring and acceptance testing.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... it functions as designed and that all alarms, controls, and interlocks work properly. (h) Fire protection. For panoramic irradiators, the licensee shall test the ability of the heat and smoke detectors to detect a fire, to activate alarms, and to cause the source rack to automatically become fully...

  15. Solar panel acceptance testing using a pulsed solar simulator

    NASA Technical Reports Server (NTRS)

    Hershey, T. L.

    1977-01-01

    Utilizing specific parameters as area of an individual cell, number in series and parallel, and established coefficient of current and voltage temperature dependence, a solar array irradiated with one solar constant at AMO and at ambient temperature can be characterized by a current-voltage curve for different intensities, temperatures, and even different configurations. Calibration techniques include: uniformity in area, depth and time, absolute and transfer irradiance standards, dynamic and functional check out procedures. Typical data are given for individual cell (2x2 cm) to complete flat solar array (5x5 feet) with 2660 cells and on cylindrical test items with up to 10,000 cells. The time and energy saving of such testing techniques are emphasized.

  16. Acceptance Performance Test Guideline for Utility Scale Parabolic Trough and Other CSP Solar Thermal Systems: Preprint

    SciTech Connect

    Mehos, M. S.; Wagner, M. J.; Kearney, D. W.

    2011-08-01

    Prior to commercial operation, large solar systems in utility-size power plants need to pass a performance acceptance test conducted by the engineering, procurement, and construction (EPC) contractor or owners. In lieu of the present absence of ASME or other international test codes developed for this purpose, the National Renewable Energy Laboratory has undertaken the development of interim guidelines to provide recommendations for test procedures that can yield results of a high level of accuracy consistent with good engineering knowledge and practice. Progress on interim guidelines was presented at SolarPACES 2010. Significant additions and modifications were made to the guidelines since that time, resulting in a final report published by NREL in April 2011. This paper summarizes those changes, which emphasize criteria for assuring thermal equilibrium and steady state conditions within the solar field.

  17. Acceptance Testing of the Vapor Phase Catalytic Ammonia Removal Engineering Development Unit

    NASA Technical Reports Server (NTRS)

    Flynn, Michael; Fisher, John; Kliss, Mark; Tleimat, Maher; Quinn, Gregory; Fort, James; Nalette, Tim; Baker, Gale

    2005-01-01

    This paper describes the results of acceptance testing of the Vapor Phase Catalytic Ammonia Removal (VPCAR) technology. The VPCAR technology is currently being developed by NASA as a Mars transit vehicle water recycling system. NASA has recently completed a grant to develop a next generation VPCAR system. This grant was peer reviewed and funded through the Advanced Life Support (ALS) National Research Announcement (NRA). The grant funded a contract with Water Reuse Technology Inc. to construct an engineering development unit. This contract concluded with the shipment of the final deliverable to NASA on 8/31/03. The objective of the acceptance testing was to characterize the performance of this new system. This paper presents the results of mass power, and volume measurements for the delivered system. In addition, product water purity analysis for a Mars transit mission and a planetary base wastewater ersatz are provided. Acoustic noise levels, interface specifications and system reliability results are also discussed. An assessment of the readiness of the technology for human testing and recommendations for future improvements are provided.

  18. MBA acceptance test procedures, software Version 1.4

    SciTech Connect

    Mullaney, J.E.; Russell, V.K.

    1994-10-17

    The Mass Balance Program (MBA) is an adjunct to the Materials Accounting database system, Version 3.4. MBA was written to equip the personnel performing K-Basin encapsulation tasks with a conservative estimate of accumulated sludge during the processing of canisters into and out of the chute. The K Basins Materials Balance programs had some minor improvements made to it to feedback the chute processing status to the operator better. This ATP describes how the code was to be tested to verify its correctness.

  19. 46 CFR 162.060-12 - Use and acceptance of existing test data.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 6 2012-10-01 2012-10-01 false Use and acceptance of existing test data. 162.060-12 Section 162.060-12 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ENGINEERING EQUIPMENT Ballast Water Management Systems § 162.060-12 Use and acceptance of...

  20. 7 CFR 1755.400 - RUS standard for acceptance tests and measurements of telecommunications plant.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 11 2014-01-01 2014-01-01 false RUS standard for acceptance tests and measurements of telecommunications plant. 1755.400 Section 1755.400 Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE TELECOMMUNICATIONS POLICIES ON SPECIFICATIONS, ACCEPTABLE MATERIALS,...

  1. 7 CFR 1755.400 - RUS standard for acceptance tests and measurements of telecommunications plant.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 11 2013-01-01 2013-01-01 false RUS standard for acceptance tests and measurements of telecommunications plant. 1755.400 Section 1755.400 Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE TELECOMMUNICATIONS POLICIES ON SPECIFICATIONS, ACCEPTABLE MATERIALS,...

  2. 7 CFR 1755.400 - RUS standard for acceptance tests and measurements of telecommunications plant.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false RUS standard for acceptance tests and measurements of telecommunications plant. 1755.400 Section 1755.400 Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE TELECOMMUNICATIONS POLICIES ON SPECIFICATIONS, ACCEPTABLE MATERIALS,...

  3. 7 CFR 1755.400 - RUS standard for acceptance tests and measurements of telecommunications plant.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 11 2012-01-01 2012-01-01 false RUS standard for acceptance tests and measurements of telecommunications plant. 1755.400 Section 1755.400 Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE TELECOMMUNICATIONS POLICIES ON SPECIFICATIONS, ACCEPTABLE MATERIALS,...

  4. 7 CFR 1755.400 - RUS standard for acceptance tests and measurements of telecommunications plant.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 11 2011-01-01 2011-01-01 false RUS standard for acceptance tests and measurements of telecommunications plant. 1755.400 Section 1755.400 Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE TELECOMMUNICATIONS POLICIES ON SPECIFICATIONS, ACCEPTABLE MATERIALS,...

  5. Acceptability and feasibility of HIV self-testing among men who have sex with men in Peru and Brazil.

    PubMed

    Volk, Jonathan E; Lippman, Sheri A; Grinsztejn, Beatriz; Lama, Javier R; Fernandes, Nilo M; Gonzales, Pedro; Hessol, Nancy A; Buchbinder, Susan

    2016-06-01

    HIV self-testing has the potential to increase testing frequency and uptake. This pilot study assessed the feasibility and acceptability of HIV self-testing in a sample of sexually active men who have sex with men (MSM) in Peru and Brazil. Participants were trained to use a whole blood rapid HIV self-test and instructed to use the self-test monthly during this three-month study. Test acceptability was measured with self-reported use of the test at the one-month and three-month study visits, and test feasibility was assessed by direct observation of self-test administration at the final three-month visit. A total of 103 participants (52 in Peru and 51 in Brazil) were enrolled, and 86% completed the three-month study. Nearly all participants reported use of the self-test (97% at one-month and 98% at three-month visit), and all participants correctly interpreted the self-administered test results when observed using the test at the final study visit. HIV self-testing with a blood-based assay was highly acceptable and feasible. HIV self-testing may have the potential to increase testing frequency and to reach high-risk MSM not currently accessing HIV-testing services. PMID:25971262

  6. Project B610 process control configuration acceptance test procedure

    SciTech Connect

    Silvan, G.R.

    1994-09-20

    The purpose of this test is to verify the Westinghouse configuration of the MICON A/S Distributed Control System for project B610. The following will be verified: proper assignment and operation of all field inputs to and outputs from the MICON Termination panels; proper operation of all display data on the operator`s console; proper operation of all required alarms; and proper operation of all required interlocks. The MICON A/S control system is configured to replace all the control, indication, and alarm panels now located in the Power Control Room. Nine systems are covered by this control configuration, 2736-ZB HVAC, 234-5Z HVAC, Process Vacuum, Dry Air, 291-Z Closed Loop Cooling, Building Accelerometer, Evacuation Siren, Stack CAMs, and Fire. The 2736-ZB HVAC system consists of the ventilation controls for 2736-ZB and 2736-Z as well as alarms for the emergency generators and 232-Z. The 234-5Z HVAC system is the ventilation controls for 235-5Z and 236-Z buildings. Process Vacuum covers the controls for the 26 inch vacuum system. Dry Air covers the controls for the steam and electric air dryers. The 291-Z Closed Loop Cooling system consists of the status indications and alarms for the 291-Z compressor and vacuum pump closed loop cooling system. The rest of closed loop cooling was tested earlier. The Building Accelerometer system consists of the status indications for the two seismic system accelerometers. The Evacuation Siren system includes the controls for the evacuation and take cover sirens. Stack CAMs cover the alarms for the various building ventilation stack continuous air monitors. Finally, the Fire system covers the various fire alarms now located in Room 321-A.

  7. For your interest? The ethical acceptability of using non-invasive prenatal testing to test 'purely for information'.

    PubMed

    Deans, Zuzana; Clarke, Angus J; Newson, Ainsley J

    2015-01-01

    Non-invasive prenatal testing (NIPT) is an emerging form of prenatal genetic testing that provides information about the genetic constitution of a foetus without the risk of pregnancy loss as a direct result of the test procedure. As with other prenatal tests, information from NIPT can help to make a decision about termination of pregnancy, plan contingencies for birth or prepare parents to raise a child with a genetic condition. NIPT can also be used by women and couples to test purely 'for information'. Here, no particular action is envisaged following the test; it is motivated entirely by an interest in the result. The fact that NIPT can be performed without posing a risk to the pregnancy could give rise to an increase in such requests. In this paper, we examine the ethical aspects of using NIPT 'purely for information', including the competing interests of the prospective parents and the future child, and the acceptability of testing for 'frivolous' reasons. Drawing on several clinical scenarios, we claim that arguments about testing children for genetic conditions are relevant to this debate. In addition, we raise ethical concerns over the potential for objectification of the child. We conclude that, in most cases, using NIPT to test for adult-onset conditions, carrier status or non-serious traits presenting in childhood would be unacceptable. PMID:25521970

  8. Performance deterioration due to acceptance testing and flight loads; JT90 jet engine diagnostic program

    NASA Technical Reports Server (NTRS)

    Olsson, W. J.

    1982-01-01

    The results of a flight loads test of the JT9D-7 engine are presented. The goals of this test program were to: measure aerodynamic and inertia loads on the engine during flight, explore the effects of airplane gross weight and typical maneuvers on these flight loads, simultaneously measure the changes in engine running clearances and performance resulting from the maneuvers, make refinements of engine performance deterioration prediction models based on analytical results of the tests, and make recommendations to improve propulsion system performance retention. The test program included a typical production airplane acceptance test plus additional flights and maneuvers to encompass the range of flight loads in revenue service. The test results indicated that aerodynamic loads, primarily at take-off, were the major cause of rub-indicated that aerodynamic loads, primarily at take-off, were the major cause of rub-induced deterioration in the cold sectin of the engine. Differential thermal expansion between rotating and static parts plus aerodynamic loads combined to cause blade-to-seal rubs in the turbine.

  9. Chemical compatibility screening test results

    SciTech Connect

    Nigrey, P.J.; Dickens, T.G.

    1997-12-01

    A program for evaluating packaging components that may be used in transporting mixed-waste forms has been developed and the first phase has been completed. This effort involved the screening of ten plastic materials in four simulant mixed-waste types. These plastics were butadiene-acrylonitrile copolymer rubber, cross-linked polyethylene (XLPE), epichlorohydrin rubber, ethylene-propylene rubber (EPDM), fluorocarbon (Viton or Kel-F), polytetrafluoroethylene, high-density polyethylene (HDPE), isobutylene-isoprene copolymer rubber (butyl), polypropylene, and styrene-butadiene rubber (SBR). The selected simulant mixed wastes were (1) an aqueous alkaline mixture of sodium nitrate and sodium nitrite; (2) a chlorinated hydrocarbon mixture; (3) a simulant liquid scintillation fluid; and (4) a mixture of ketones. The testing protocol involved exposing the respective materials to 286,000 rads of gamma radiation followed by 14-day exposures to the waste types at 60{degrees}C. The seal materials were tested using vapor transport rate (VTR) measurements while the liner materials were tested using specific gravity as a metric. For these tests, a screening criterion of 0.9 g/hr/m{sup 2} for VTR and a specific gravity change of 10% was used. Based on this work, it was concluded that while all seal materials passed exposure to the aqueous simulant mixed waste, EPDM and SBR had the lowest VTRs. In the chlorinated hydrocarbon simulant mixed waste, only Viton passed the screening tests. In both the simulant scintillation fluid mixed waste and the ketone mixture simulant mixed waste, none of the seal materials met the screening criteria. For specific gravity testing of liner materials, the data showed that while all materials with the exception of polypropylene passed the screening criteria, Kel-F, HDPE, and XLPE offered the greatest resistance to the combination of radiation and chemicals.

  10. Utility-Scale Parabolic Trough Solar Systems: Performance Acceptance Test Guidelines, April 2009 - December 2010

    SciTech Connect

    Kearney, D.

    2011-05-01

    Prior to commercial operation, large solar systems in utility-size power plants need to pass a performance acceptance test conducted by the engineering, procurement, and construction (EPC) contractor or owners. In lieu of the present absence of ASME or other international test codes developed for this purpose, the National Renewable Energy Laboratory has undertaken the development of interim guidelines to provide recommendations for test procedures that can yield results of a high level of accuracy consistent with good engineering knowledge and practice. The Guidelines contained here are specifically written for parabolic trough collector systems with a heat-transport system using a high-temperature synthetic oil, but the basic principles are relevant to other CSP systems.

  11. Experimental electrochemical capacitor test results

    SciTech Connect

    Wright, R.B.; Murphy, T.C.; Rogers, S.A.; Sutula, R.A.

    1998-07-01

    Various electrochemical capacitors (ultracapacitors) are being developed for hybrid vehicles as candidate power assist devices for the Partnership for a New Generation of Vehicles (PNGV) fast-response engine. The envisioned primary functions of the ultracapacitor are to level the dynamic power loads on the primary propulsion device and recover available energy from regenerative breaking during off-peak power periods. This paper will present test data from selected US Department of Energy (DOE) supported ultracapacitor projects designed to meet the fast response engine requirements. This paper will address the temperature dependence of test data obtained from a set of three devices provided from Maxwell Energy Products, Inc. These devices are rated at 2,300 F at 2.3 V. Constant-current, constant-power, and self-discharge testing as a function of temperature have been conducted. From these tests were determined the capacitance, equivalent series resistance, specific energy and power, and the self-discharge energy loss factor as a function of the device operating temperature.

  12. Acceptability of rapid oral fluid HIV testing among male injection drug users in Taiwan, 1997 and 2007.

    PubMed

    Lyu, Shu-Yu; Morisky, Donald E; Yeh, Ching-Ying; Twu, Shiing-Jer; Peng, Eugene Yu-Chang; Malow, Robert M

    2011-04-01

    Rapid oral fluid HIV testing (rapid oral testing) is in the process of being adapted in Taiwan and elsewhere given its advantages over prior HIV testing methods. To guide this process, we examined the acceptability of rapid oral testing at two time points (i.e., 1997 and 2007) among one of the highest risk populations, male injection drug users (IDUs). For this purpose, an anonymous self-administered survey was completed by HIV-negative IDUs involved in the criminal justice system in 1997 (N (1)=137 parolees) and 2007 (N (2)=106 prisoners). A social marketing model helped guide the design of our questionnaire to assess the acceptability of rapid oral testing. This included assessing a new product, across four marketing dimensions: product, price, promotion, and place. Results revealed that in both 1997 and 2007, over 90% indicated that rapid oral testing would be highly acceptable, particularly if the cost was under US$6, and that a pharmacy would be the most appropriate and accessible venue for selling the rapid oral testing kits. The vast majority of survey respondents believed that the cost of rapid oral testing should be federally subsidized and that television and newspaper advertisements would be the most effective media to advertise for rapid oral testing. Both the 1997 and 2007 surveys suggested that rapid oral HIV testing would be particularly accepted in Taiwan by IDUs after release from the criminal justice system. PMID:21271392

  13. Ultrasonic Transducer Irradiation Test Results

    SciTech Connect

    Daw, Joshua; Palmer, Joe; Ramuhalli, Pradeep; Keller, Paul; Montgomery, Robert; Chien, Hual-Te; Kohse, Gordon; Tittmann, Bernhard; Reinhardt, Brian; Rempe, Joy

    2015-02-01

    Ultrasonic technologies offer the potential for high-accuracy and -resolution in-pile measurement of a range of parameters, including geometry changes, temperature, crack initiation and growth, gas pressure and composition, and microstructural changes. Many Department of Energy-Office of Nuclear Energy (DOE-NE) programs are exploring the use of ultrasonic technologies to provide enhanced sensors for in-pile instrumentation during irradiation testing. For example, the ability of small diameter ultrasonic thermometers (UTs) to provide a temperature profile in candidate metallic and oxide fuel would provide much needed data for validating new fuel performance models. Other ongoing efforts include an ultrasonic technique to detect morphology changes (such as crack initiation and growth) and acoustic techniques to evaluate fission gas composition and pressure. These efforts are limited by the lack of identified ultrasonic transducer materials capable of long term performance under irradiation test conditions. For this reason, the Pennsylvania State University (PSU) was awarded an ATR NSUF project to evaluate the performance of promising magnetostrictive and piezoelectric transducers in the Massachusetts Institute of Technology Research Reactor (MITR) up to a fast fluence of at least 1021 n/cm2. The goal of this research is to characterize and demonstrate magnetostrictive and piezoelectric transducer operation during irradiation, enabling the development of novel radiation-tolerant ultrasonic sensors for use in Material Testing Reactors (MTRs). As such, this test is an instrumented lead test and real-time transducer performance data is collected along with temperature and neutron and gamma flux data. The current work bridges the gap between proven out-of-pile ultrasonic techniques and in-pile deployment of ultrasonic sensors by acquiring the data necessary to demonstrate the performance of ultrasonic transducers. To date, one piezoelectric

  14. Fatigue acceptance test limit criteria for larger diameter rolled thread fasteners

    SciTech Connect

    Kephart, A.R.

    1999-05-19

    This document describes a fatigue lifetime acceptance test criterion by which studs having rolled threads, larger than 1.0 inches (25 mm) in diameter, can be assured to meet minimum quality attributes associated with a controlled rolling process.

  15. Mars Balloon Flight Test Results

    NASA Technical Reports Server (NTRS)

    Hall, Jeffery L.; Pauken, Michael T.; Kerzhanovich, Viktor V.; Walsh, Gerald J.; Kulczycki, Eric A.; Fairbrother, Debora; Shreves, Chris; Lachenmeier, Tim

    2009-01-01

    This paper describes a set of four Earth atmosphere flight test experiments on prototype helium superpressure balloons designed for Mars. Three of the experiments explored the problem of aerial deployment and inflation, using the cold, low density environment of the Earth's stratosphere at an altitude of 30-32 km as a proxy for the Martian atmosphere. Auxiliary carrier balloons were used in three of these test flights to lift the Mars balloon prototype and its supporting system from the ground to the stratosphere where the experiment was conducted. In each case, deployment and helium inflation was initiated after starting a parachute descent of the payload at 5 Pa dynamic pressure, thereby mimicking the conditions expected at Mars after atmospheric entry and high speed parachute deceleration. Upward and downward looking video cameras provided real time images from the flights, with additional data provided by onboard temperature, pressure and GPS sensors. One test of a 660 cc pumpkin balloon was highly successful, achieving deployment, inflation and separation of the balloon from the flight train at the end of inflation; however, some damage was incurred on the balloon during this process. Two flight tests of 12 m diameter spherical Mylar balloons were not successful, although some lessons were learned based on the failure analyses. The final flight experiment consisted of a ground-launched 12 m diameter spherical Mylar balloon that ascended to the designed 30.3 km altitude and successfully floated for 9.5 hours through full noontime daylight and into darkness, after which the telemetry system ran out of electrical power and tracking was lost. The altitude excursions for this last flight were +/-75 m peak to peak, indicating that the balloon was essentially leak free and functioning correctly. This provides substantial confidence that this balloon design will fly for days or weeks at Mars if it can be deployed and inflated without damage.

  16. Multi Canister Overpack (MCO) Combustible Gas Management Leak Test Acceptance Criteria (OCRWM)

    SciTech Connect

    SHERRELL, D.L.

    2000-10-10

    The purpose of this document is to support the Spent Nuclear Fuel Project's combustible gas management strategy while avoiding the need to impose any requirements for oxygen free atmospheres within storage tubes that contain multi-canister overpacks (MCO). In order to avoid inerting requirements it is necessary to establish and confirm leak test acceptance criteria for mechanically sealed and weld sealed MCOs that are adequte to ensure that, in the unlikely event the leak test results for any MCO were to approach either of those criteria, it could still be handled and stored in stagnant air without compromising the SNF Project's overall strategy to prevent accumulation of combustible gas mixtures within MCOs or within their surroundings. To support that strategy, this document: (1) establishes combustible gas management functions and minimum functional requirements for the MCO's mechanical seals and closure weld(s); (2) establishes a maximum practical value for the minimum required initial MCO inert backfill gas pressure; and (3) based on items 1 and 2, establishes and confirms leak test acceptance criteria for the MCO's mechanical seal and final closure weld(s).

  17. EVALUATION OF ARG-1 SAMPLES PREPARED BY CESIUM CARBONATE DISSOLUTION DURING THE ISOLOK SME ACCEPTABILITY TESTING

    SciTech Connect

    Edwards, T.; Hera, K.; Coleman, C.

    2011-12-05

    Evaluation of Defense Waste Processing Facility (DWPF) Chemical Process Cell (CPC) cycle time identified several opportunities to improve the CPC processing time. The Mechanical Systems & Custom Equipment Development (MS&CED) Section of the Savannah River National Laboratory (SRNL) recently completed the evaluation of one of these opportunities - the possibility of using an Isolok sampling valve as an alternative to the Hydragard valve for taking DWPF process samples at the Slurry Mix Evaporator (SME). The use of an Isolok for SME sampling has the potential to improve operability, reduce maintenance time, and decrease CPC cycle time. The SME acceptability testing for the Isolok was requested in Task Technical Request (TTR) HLW-DWPF-TTR-2010-0036 and was conducted as outlined in Task Technical and Quality Assurance Plan (TTQAP) SRNLRP-2011-00145. RW-0333P QA requirements applied to the task, and the results from the investigation were documented in SRNL-STI-2011-00693. Measurement of the chemical composition of study samples was a critical component of the SME acceptability testing of the Isolok. A sampling and analytical plan supported the investigation with the analytical plan directing that the study samples be prepared by a cesium carbonate (Cs{sub 2}CO{sub 3}) fusion dissolution method and analyzed by Inductively Coupled Plasma - Optical Emission Spectroscopy (ICP-OES). The use of the cesium carbonate preparation method for the Isolok testing provided an opportunity for an additional assessment of this dissolution method, which is being investigated as a potential replacement for the two methods (i.e., sodium peroxide fusion and mixed acid dissolution) that have been used at the DWPF for the analysis of SME samples. Earlier testing of the Cs{sub 2}CO{sub 3} method yielded promising results which led to a TTR from Savannah River Remediation, LLC (SRR) to SRNL for additional support and an associated TTQAP to direct the SRNL efforts. A technical report resulting

  18. An Examination of Three Texas High Schools' Restructuring Strategies that Resulted in an Academically Acceptable Rating

    ERIC Educational Resources Information Center

    Massey Fields, Chamara

    2011-01-01

    This study examined three high schools in a large urban school district in Texas that achieved an academically acceptable rating after being sanctioned to reconstitute by state agencies. Texas state accountability standards are a result of the No Child Left Behind Act of 2011 (NCLB). Texas state law requires schools to design a reconstitution plan…

  19. Results of Neptunium Disposal Testing

    SciTech Connect

    Walker, D.D.

    2003-10-07

    Researchers investigated the neutralization of neptunium solution from H-Canyon Tank 16.4 and the properties of the resulting slurry. This work investigated slurry properties from a single neutralization protocol and limited storage times.

  20. Test report for run-in acceptance testing of hydrogen mitigation retrieval Pump-3

    SciTech Connect

    Berglin, B.G.

    1997-08-15

    This report will provide the findings of the demonstration test conducted on the Double-Shell Tank (DST) 241-SY-101 HMR Pump-3 in accordance with WHC-SDWM-TP-434 ``Test plan for run-in acceptance testing of hydrogen mitigation/retrieval pump-3`` at the 400 Area Maintenance and Storage Facility (MASF) building from 7 June 1996 through 30 July 1996 per work package 4A-96-92/W. The DST 241-SY-101 hydrogen mitigation retrieval Pump-3 is a 200-HP submersible electric driven pump that has been modified for use in the DST 241-SY-101 containing mixed waste located in the 200W area. The pump has a motor driven rotation mechanism that allows the pump column to rotate through 355{degree}. Prior to operation, pre-operational checks were performed which included loop calibration grooming and alignment of instruments, learning how plumb HMR-3 assembly hung in a vertical position and bump test of the motor to determine rotation direction. The pump was tested in the MASF Large Diameter Cleaning Vessel (LDCV) with process water at controlled temperatures and levels. In addition, the water temperature of the cooling water to the motor oil heat exchanger was recorded during testing. A 480-volt source powered a Variable Frequency Drive (VFD). The VFD powered the pump at various frequencies and voltages to control speed and power output of the pump. A second VFD powered the oil cooling pump. A third VFD was not available to operate the rotational drive motor during the 72 hour test, so it was demonstrated as operational before and after the test. A Mini Acquisition and Control System (Mini-DACS) controls pump functions and monitoring of the pump parameters. The Mini-DACS consists of three computers, software and some Programmable Logic Controllers (PLC). Startup and shutdown of either the pump motor or the oil cooling pump can be accomplished by the Mini-DACS. When the pump was in operation, the Mini-DACS monitors automatically collects data electronically. However, some required data

  1. Acceptance of New Technology: A Usability Test of a Computerized Adaptive Test for Fatigue in Rheumatoid Arthritis

    PubMed Central

    Nikolaus, Stephanie; Taal, Erik; Vonkeman, Harald E; Glas, Cees AW; van de Laar, Mart AFJ

    2014-01-01

    Background Little is known about the acceptance and usability of computerized adaptive tests (CATs) among patients with rheumatoid arthritis (RA). The main difference between completing a CAT and a traditional questionnaire concerns item presentation. CATs only provide one item at a time on the screen, and skipping forward or backward to review and change already given answers is often not possible. Objective The objective of this study was to examine how patients with RA experience a Web-based CAT for fatigue. Methods In individual sessions, participants filled in the CAT while thinking aloud, and were subsequently interviewed about their experience with the new instrument. The technology acceptance model (TAM) was used to structure the results. Results The participants were 15 patients with RA. They perceived the CAT as clear, brief, and easy to use. They were positive about answering one question per screen, the changing response options, layout, progress bar, and item number. There were 40% (6/15) of the participants that also mentioned that they experienced the completion of the CAT as useful and pleasant, and liked the adaptive test mechanism. However, some participants noted that not all items were applicable to everybody, and that the wordings of questions within the severity dimension were often similar. Conclusions Participants perceived the “CAT Fatigue RA” as easy to use, and also its usefulness was expressed. A 2.0 version has been improved according to the participants’ comments, and is currently being used in a validation study before it will be implemented in daily clinical practice. Our results give a first indication that CAT methodology may outperform traditional questionnaires not merely on measurement precision, but also on usability and acceptance valuation. PMID:27025404

  2. Test report for run-in acceptance testing of Project W-151 300 HP mixing pumps

    SciTech Connect

    Berglin, B.G.

    1998-01-29

    This report documents the results of a performance demonstration and operational checkout of three 300 HP mixer pumps in accordance with WHC-SD-WI51-TS-001 ``Mixer Pump Test Specification for Project W-151`` and Statement of Work 8K520-EMN-95-004 ``Mixer Pump Performance Demonstration at MASF`` in the 400 Area Maintenance and Storage Facility (MASF) building. Testing of the pumps was performed by Fast Flux Test Facility (FFTF) Engineering and funded by the Tank Waste Remediation System (TWRS) Project W-151. Testing began with the first pump on 04-01-95 and ended with the third pump on 11-01-96. Prior to testing, the MASF was modified and prepared to meet the pump testing requirements set forth by the Test Specification and the Statement of Work.

  3. German bundle shear - cold test results

    SciTech Connect

    Kunze, P.

    1986-01-01

    In the planned Federal Republic of Germany (FRG) reprocessing plant, the mechanical decladding of the fuel elements will be done with a bundle shear. This shear was designed and built with Thyssen Henschel by adapting the experiences of the Wiederaufarbeitungsanlage Karlsruhe (WAK), the FRG reprocessing pilot plant. The tests included boiling water reactor (BWR) and pressurized water reactor (PWR) dummy elements filled with porcelain as well as steel fuel rod simulators. During the test period with prototype bundle shear, some technical improvements have been found that refer both to operating conditions and to remote handling. In 1987 the acceptance tests will be run.

  4. Tank Monitor and Control System sensor acceptance test procedure. Revision 5

    SciTech Connect

    Scaief, C.C. III

    1994-09-26

    The purpose of this acceptance test procedure (ATP) is to verify the correct reading of sensor elements connected to the Tank Monitor and Control System (TMACS). This ATP is intended to be used for testing of the connection of existing temperature sensors, new temperature sensors, pressure sensing equipment, new Engraf level gauges, sensors that generate a current output, and discrete (on/off) inputs. It is intended that this ATP will be used each time sensors are added to the system. As a result, the data sheets have been designed to be generic. The TMACS has been designed in response to recommendations from the Defense Nuclear Facilities Safety Board primarily for improved monitoring of waste tank temperatures. The system has been designed with the capability to monitor other types of sensor input as well.

  5. High levels of acceptability of couples-based HIV testing among MSM in South Africa

    PubMed Central

    Stephenson, Rob; Rentsch, Christopher; Sullivan, Patrick

    2011-01-01

    The acceptability of couples-based voluntary HIV counseling and testing (CVCT) has not been previously investigated among MSM in South Africa. Using online advertisements, data were collected from 486 MSM, who were 18 years of age or older with a current residence in South Africa and had at least one male sex partner in the previous 12 months. The analysis examined associations between individual characteristics and willingness to utilize CVCT services. The willingness to utilize CVCT services was compellingly high (89%) among this sample of mostly White/European African (89%) and HIV-negative (83%) men. MSM who reported higher numbers of completed school years were less likely to report willingness to use CVCT. Willingness did not vary significantly across other individual demographic or behavioral characteristics. Our results show an overwhelmingly high acceptance of CVCT services. Future studies should survey a more heterogeneous population of MSM, explore the complex nature of same-sex male relationships, and why respondents would or would not use these HIV testing services. PMID:22007940

  6. The Careful Puppet Master: Reducing risk and fortifying acceptance testing with Jenkins CI

    NASA Astrophysics Data System (ADS)

    Smith, Jason A.; Richman, Gabriel; DeStefano, John; Pryor, James; Rao, Tejas; Strecker-Kellogg, William; Wong, Tony

    2015-12-01

    Centralized configuration management, including the use of automation tools such as Puppet, can greatly increase provisioning speed and efficiency when configuring new systems or making changes to existing systems, reduce duplication of work, and improve automated processes. However, centralized management also brings with it a level of inherent risk: a single change in just one file can quickly be pushed out to thousands of computers and, if that change is not properly and thoroughly tested and contains an error, could result in catastrophic damage to many services, potentially bringing an entire computer facility offline. Change management procedures can—and should—be formalized in order to prevent such accidents. However, like the configuration management process itself, if such procedures are not automated, they can be difficult to enforce strictly. Therefore, to reduce the risk of merging potentially harmful changes into our production Puppet environment, we have created an automated testing system, which includes the Jenkins CI tool, to manage our Puppet testing process. This system includes the proposed changes and runs Puppet on a pool of dozens of RedHat Enterprise Virtualization (RHEV) virtual machines (VMs) that replicate most of our important production services for the purpose of testing. This paper describes our automated test system and how it hooks into our production approval process for automatic acceptance testing. All pending changes that have been pushed to production must pass this validation process before they can be approved and merged into production.

  7. Community acceptability of use of rapid diagnostic tests for malaria by community health workers in Uganda

    PubMed Central

    2010-01-01

    Background Many malarious countries plan to introduce artemisinin combination therapy (ACT) at community level using community health workers (CHWs) for treatment of uncomplicated malaria. Use of ACT with reliance on presumptive diagnosis may lead to excessive use, increased costs and rise of drug resistance. Use of rapid diagnostic tests (RDTs) could address these challenges but only if the communities will accept their use by CHWs. This study assessed community acceptability of the use of RDTs by Ugandan CHWs, locally referred to as community medicine distributors (CMDs). Methods The study was conducted in Iganga district using 10 focus group discussions (FGDs) with CMDs and caregivers of children under five years, and 10 key informant interviews (KIIs) with health workers and community leaders. Pre-designed FGD and KII guides were used to collect data. Manifest content analysis was used to explore issues of trust and confidence in CMDs, stigma associated with drawing blood from children, community willingness for CMDs to use RDTs, and challenges anticipated to be faced by the CMDs. Results CMDs are trusted by their communities because of their commitment to voluntary service, access, and the perceived effectiveness of anti-malarial drugs they provide. Some community members expressed fear that the blood collected could be used for HIV testing, the procedure could infect children with HIV, and the blood samples could be used for witchcraft. Education level of CMDs is important in their acceptability by the community, who welcome the use of RDTs given that the CMDs are trained and supported. Anticipated challenges for CMDs included transport for patient follow-up and picking supplies, adults demanding to be tested, and caregivers insisting their children be treated instead of being referred. Conclusion Use of RDTs by CMDs is likely to be acceptable by community members given that CMDs are properly trained, and receive regular technical supervision and logistical

  8. KSC 50-MHz Doppler Radar Wind Profiler (DRWP) Operational Acceptance Test (OAT) Report

    NASA Technical Reports Server (NTRS)

    Barbre, Robert E.

    2015-01-01

    This report documents analysis results of the Kennedy Space Center updated 50-MHz Doppler Radar Wind Profiler (DRWP) Operational Acceptance Test (OAT). This test was designed to demonstrate that the new DRWP operates in a similar manner to the previous DRWP for use as a situational awareness asset for mission operations at the Eastern Range to identify rapid changes in the wind environment that weather balloons cannot depict. Data examination and two analyses showed that the updated DRWP meets the specifications in the OAT test plan and performs at least as well as the previous DRWP. Data examination verified that the DRWP provides complete profiles every five minutes from 1.8-19.5 km in vertical increments of 150 m. Analysis of 5,426 wind component reports from 49 concurrent DRWP and balloon profiles presented root mean square (RMS) wind component differences around 2.0 m/s. The DRWP's effective vertical resolution (EVR) was found to be 300 m for both the westerly and southerly wind component, which the best EVR possible given the DRWP's vertical sampling interval. A third analysis quantified the sensitivity to rejecting data that do not have adequate signal by assessing the number of first-guess propagations at each altitude. This report documents the data, quality control procedures, methodology, and results of each analysis. It also shows that analysis of the updated DRWP produced results that were at least as good as the previous DRWP with proper rationale. The report recommends acceptance of the updated DRWP for situational awareness usage as per the OAT's intent.

  9. Advanced Stirling Convertor Dynamic Test Approach and Results

    NASA Technical Reports Server (NTRS)

    Meer, David W.; Hill, Dennis; Ursic, Joseph J.

    2010-01-01

    The U.S. Department of Energy (DOE), Lockheed Martin Corporation (LM), and NASA Glenn Research Center (GRC) have been developing the Advanced Stirling Radioisotope Generator (ASRG) for use as a power system for space science missions. As part of the extended operation testing of this power system, the Advanced Stirling Convertors (ASC) at NASA GRC undergo a vibration test sequence intended to simulate the vibration history that an ASC would experience when used in an ASRG for a space mission. This sequence includes testing at workmanship and flight acceptance levels interspersed with periods of extended operation to simulate prefueling and post fueling. The final step in the test sequence utilizes additional testing at flight acceptance levels to simulate launch. To better replicate the acceleration profile seen by an ASC incorporated into an ASRG, the input spectra used in testing the convertors was modified based on dynamic testing of the ASRG Engineering Unit (ASRG EU) at LM. This paper outlines the overall test approach, summarizes the test results from the ASRG EU, describes the incorporation of those results into the test approach, and presents the results of applying the test approach to the ASC-1 #3 and #4 convertors. The test results include data from several accelerometers mounted on the convertors as well as the piston position and output power variables.

  10. Standard-B auto grab sampler hydrogen monitoring system, Acceptance Test Report

    SciTech Connect

    Lott, D.T.

    1995-05-18

    Project W-369, Watch List Tank Hydrogen Monitors, installed a Standard-C Hydrogen Monitoring System (SHMS) on the Flammable gas waste tank AN-104. General Support Projects (8K510) was support by Test Engineering (7CH30) in the performance of the Acceptance Test Procedures (ATP) to qualify the SHMS cabinets on the waste tank. The ATP`s performance was controlled by Tank Farm work package. This completed ATP is transmitted by EDT-601748 as an Acceptance Test Report (ATR) in accordance with WHC-6-1, EP 4.2 and EP 1.12.

  11. Acceptability of Sexually Transmitted Infection Testing Using Self-Collected Vaginal Swabs among College Women

    ERIC Educational Resources Information Center

    Fielder, Robyn L.; Carey, Kate B.; Carey, Michael P.

    2013-01-01

    Objective: To assess the acceptability of sexually transmitted infection (STI) testing using self-collected vaginal swabs (SCVS) among college women. Participants: First-year female students ("N" = 483). Methods: Participants were offered free testing for 3 STIs using SCVS in April 2010 and later completed a survey regarding their…

  12. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid V

    SciTech Connect

    KOCH, M.R.

    2000-07-25

    This Acceptance Test Procedure (ATP) verifies proper construction per the design drawings and tests for proper functioning of the Pumping Instrumentation and Control (PIC) skid ''V''. The scope section lists the systems and functions to be checked. This ATP will be performed at the Site Fabrication Services (SFS) shop upon completion of the construction of the PIC skid.

  13. Acceptance Test Procedure for New Pumping and Instrumentation Control Skid M

    SciTech Connect

    KOCH, M.R.

    1999-11-09

    This Acceptance Test Procedure (ATP) verifies proper construction per the design drawings and tests for proper functioning of the Pumping and Instrumentation Control (PIC) skid ''M''. The Scope section lists the systems and functions to be checked. This ATP will be performed at the Site Fabrication Service's (SFS) shop upon completion of construction of the PIC skid.

  14. Enraf series 854 Advanced Technology Gauge (ATG) acceptance test procedure. Revision 3

    SciTech Connect

    Barnes, G.A.

    1995-05-08

    This procedure provides acceptance testing for Enraf Series 854 level gauges used to monitor levels in Hanford Waste Storage Tanks. The test will verify that the gauge functions according to the manufacturer`s instructions and specifications and is properly setup prior to being delivered to the tank farm area.

  15. Understanding Student Teachers' Behavioural Intention to Use Technology: Technology Acceptance Model (TAM) Validation and Testing

    ERIC Educational Resources Information Center

    Wong, Kung-Teck; Osman, Rosma bt; Goh, Pauline Swee Choo; Rahmat, Mohd Khairezan

    2013-01-01

    This study sets out to validate and test the Technology Acceptance Model (TAM) in the context of Malaysian student teachers' integration of their technology in teaching and learning. To establish factorial validity, data collected from 302 respondents were tested against the TAM using confirmatory factor analysis (CFA), and structural equation…

  16. Honeycomb spacer crush stength test results

    SciTech Connect

    Leader, D.R.

    1993-09-15

    This report discusses aluminum honeycomb spacers, which are used as an energy absorbent material in shipping packages for off site shipment of radioactive materials and which were ordered in two crush strengths, 1,000 psi and 2,000 psi for use in drop tests requested by the Packaging and Transportation group as part of the shipping container rectification process. Both the group as part of the shipping container rectification process. Both the vendor and the SRTC Materials Laboratory performed crush strength measurements on test samples made from the material used to fabricate the actual spacers. The measurements of crush strength made in the SRTC Materials Laboratory are within 100 psi of the measurements made by the manufacturer for all samples tested and all test measurements are within 10% of the specified crush strength, which is acceptable to the P&T group for the planned tests.

  17. HIV-Related Stigma, Social Norms and HIV Testing in Soweto and Vulindlela, South Africa: NIMH Project Accept (HPTN 043)

    PubMed Central

    Young, Sean D.; Hlavka, Zdenek; Modiba, Precious; Gray, Glenda; Van Rooyen, Heidi; Richter, Linda; Szekeres, Greg; Coates, Thomas

    2010-01-01

    Objective HIV testing is necessary to curb the increasing epidemic. However, HIV-related stigma and perceptions of low likelihood of societal HIV testing may reduce testing rates. This study aimed to explore this association in South Africa, where HIV rates are extraordinarily high. Methods Data were taken from the Soweto and Vulindlela, South African sites of Project Accept, a multi-national HIV prevention trial. Self-reported HIV testing, stigma, and social norms items were used to study the relationship between HIV testing, stigma, and perceptions about societal testing rates. The stigma items were broken into 3 factors: negative attitudes, negative perceptions about people living with HIV, and perceptions of fair treatment for people living with HIV (equity). Results Results from a univariate logistic regression suggest that past history of HIV testing was associated with decreased negative attitudes about people living with HIV/AIDS, increased perceptions that people living with HIV/AIDS experience discrimination, and increased perceptions that people with HIV should be treated equitably. Results from a multivariate logistic regression confirm these effects and suggests these differences vary according to gender and age. Compared to people who had never tested for HIV, those who had previously tested were more likely to believe that the majority of people have tested for HIV. Conclusion Data suggest that interventions designed to increase HIV testing in South Africa should address stigma and perceptions of societal testing. Keywords: stigma, HIV testing, South Africa, Project Accept PMID:20980913

  18. A Randomized Controlled Trial of Acceptance-Based Behavior Therapy and Cognitive Therapy for Test Anxiety: A Pilot Study

    ERIC Educational Resources Information Center

    Brown, Lily A.; Forman, Evan M.; Herbert, James D.; Hoffman, Kimberly L.; Yuen, Erica K.; Goetter, Elizabeth M.

    2011-01-01

    Many university students suffer from test anxiety that is severe enough to impair performance. Given mixed efficacy results of previous cognitive-behavior therapy (CBT) trials and a theoretically driven rationale, an acceptance-based behavior therapy (ABBT) approach was compared to traditional CBT (i.e., Beckian cognitive therapy; CT) for the…

  19. A data base and a standard material for use in acceptance testing of low-activity waste products

    SciTech Connect

    Wolf, S.F.; Ebert, W.L.; Luo, J.S.; Strachan, D.M.

    1998-04-01

    The authors have conducted replicate dissolution tests following the product consistency test (PCT) procedure to measure the mean and standard deviation of the solution concentrations of B, Na, and Si at various combinations of temperature, duration, and glass/water mass ratio. Tests were conducted with a glass formulated to be compositionally similar to low-activity waste products anticipated for Hanford to evaluate the adequacy of test methods that have been designated in privatization contracts for use in product acceptance. An important finding from this set of tests is that the solution concentrations generated in tests at 20 C will likely be too low to measure the dissolution rates of waste products reliably. Based on these results, the authors recommend that the acceptance test be conducted at 40 C. Tests at 40 C generated higher solution concentrations, were more easily conducted, and the measured rates were easily related to those at 20 C. Replicate measurements of other glass properties were made to evaluate the possible use of LRM-1 as a standard material. These include its composition, homogeneity, density, compressive strength, the Na leachability index with the ANSI/ANS 16.1 leach test, and if the glass is characteristically hazardous with the toxicity characteristic leach procedure. The values of these properties were within the acceptable limits identified for Hanford low-activity waste products. The reproducibility of replicate tests and analyses indicates that the glass would be a suitable standard material.

  20. NIMH Project Accept (HPTN 043): Results from In-Depth Interviews with a Longitudinal Cohort of Community Members

    PubMed Central

    Maman, Suzanne; van Rooyen, Heidi; Stankard, Petra; Chingono, Alfred; Muravha, Tshifhiwa; Ntogwisangu, Jacob; Phakathi, Zipho; Srirak, Namtip; F.Morin, Stephen

    2014-01-01

    Introduction NIMH Project Accept (HPTN 043) is a community- randomized trial to test the safety and efficacy of a community-level intervention designed to increase testing and lower HIV incidence in Tanzania, Zimbabwe, South Africa and Thailand. The evaluation design included a longitudinal study with community members to assess attitudinal and behavioral changes in study outcomes including HIV testing norms, HIV-related discussions, and HIV-related stigma. Methods A cohort of 657 individuals across all sites was selected to participate in a qualitative study that involved 4 interviews during the study period. Baseline and 30-month data were summarized according to each outcome, and a qualitative assessment of changes was made at the community level over time. Results Members from intervention communities described fewer barriers and greater motivation for testing than those from comparison communities. HIV-related discussions in intervention communities were more grounded in personal testing experiences. A change in HIV-related stigma over time was most pronounced in Tanzania and Zimbabwe. Participants in the intervention communities from these two sites attributed community-level changes in attitudes to project specific activities. Discussion The Project Accept intervention was associated with more favorable social norms regarding HIV testing, more personal content in HIV discussions in all study sites, and qualitative changes in HIV-related stigma in two of five sites. PMID:24489841

  1. SU-E-P-46: Clinical Acceptance Testing and Implementation of a Portable CT Unit

    SciTech Connect

    LaFrance, M; Marsh, S; Hicks, R; O’Donnell-Moran, G

    2015-06-15

    Purpose: Planning for the first installation in New England of a new portable CT unit to be used in the Operating Room required the integration of many departments including Surgery, Neurosurgery, Information Services, Clinical Engineering, Radiology and Medical Physics/Radiation Safety. Acceptance testing and the quality assurance procedures were designed to optimize image quality and patient and personnel radiation exposure. Methods: The vendor’s protocols were tested using the CT Dosimetry phantoms. The system displayed the CTDIw instead of the CTDIvol while testing the unit. Radiation exposure was compared to existing CT scanners from installed CT units throughout the facility. Brainlab measures all 4 periphery slots on the CT Dosimetry phantom. The ACR measures only the superior slot for the periphery measurement. A comprehensive radiation survey was also performed for several locations. Results: The CTDIvol measurements were comparable for the following studies: brain, C-Spine, and sinuses. However, the mobile CT measurements were slightly higher than other CT units but within acceptable tolerance if measured using the ACR method.Based on scatter measurements, it was determined if any personnel were to stay in the OR Suite during image acquisition that the appropriate lead apron and thyroid shields had to be worn.In addition, to reduce unnecessary scatter, there were two mobile 6 foot wide shields (1/16″ lead equivalent) available to protect personnel in the room and adjacent areas. Conclusion: Intraoperative CT provides the physician new opportunities for evaluation of the progression of surgical resections and device placement at the cost of increasing the amount of trained personnel required to perform this procedure. It also brings with it challenges to keep the radiation exposure to the patients and staff within reasonable limits.

  2. Acceptability and Feasibility Results of a Strength-Based Skills Training Program for Dementia Caregiving Dyads

    PubMed Central

    Judge, Katherine S.; Yarry, Sarah J.; Orsulic-Jeras, Silvia

    2010-01-01

    Purpose: The current article provides an in-depth description of a dyadic intervention for individuals with dementia and their family caregivers. Using a strength-based approach, caregiving dyads received skills training across 5 key areas: (a) education regarding dementia and memory loss, (b) effective communication, (c) managing memory loss, (d) staying active, and (e) recognizing emotions and behaviors. Results of the acceptability and feasibility of the intervention protocols are also presented. Design and Methods: Caregiving dyads were randomly assigned to participate in the intervention. Participants in the treatment condition were asked to complete a series of evaluation questions after each intervention session and an overall evaluation of the program. Data were also collected from the intervention specialists who implemented the protocols. Results: Overall, the evaluation data indicated that the content and process of the intervention were viewed as highly acceptable and feasible by both participants and intervention specialists. Implications: This article highlights the merit of using a strength-based approach for working with caregiving dyads with dementia and how a single intervention protocol can be used to address the goals of both care partners. Furthermore, the intervention program was found to be highly acceptable and feasible, which is an important aspect of developing dyadic protocols. PMID:19808841

  3. TESTING AND ACCEPTANCE OF FUEL PLATES FOR RERTR FUEL DEVELOPMENT EXPERIMENTS

    SciTech Connect

    J.M. Wight; G.A. Moore; S.C. Taylor

    2008-10-01

    This paper discusses how candidate fuel plates for RERTR Fuel Development experiments are examined and tested for acceptance prior to reactor insertion. These tests include destructive and nondestructive examinations (DE and NDE). The DE includes blister annealing for dispersion fuel plates, bend testing of adjacent cladding, and microscopic examination of archive fuel plates. The NDE includes Ultrasonic (UT) scanning and radiography. UT tests include an ultrasonic scan for areas of “debonds” and a high frequency ultrasonic scan to determine the "minimum cladding" over the fuel. Radiography inspections include identifying fuel outside of the maximum fuel zone and measurements and calculations for fuel density. Details of each test are provided and acceptance criteria are defined. These tests help to provide a high level of confidence the fuel plate will perform in the reactor without a breach in the cladding.

  4. Acceptance test plan for the 241-AN-105 multi-function corrosion monitoring system

    SciTech Connect

    EDGEMON, G.L.

    1999-06-24

    This Acceptance Test Procedure (ATP) will document the satisfactory operation of the corrosion probe tree assembly destined for installation into tank 241-AN-105. This ATP will be performed by the manufacturer prior to delivery to the site. The objective of this procedure is to demonstrate and document the acceptance of the corrosion probe tree assembly to be installed into tank 241-AN-105. The test will consist of a pressure test to verify leak tightness of the probe tree body, a continuity test of the probe tree wiring, a test of the high level detector wiring, a test of the operation of the Type K thermocouples along the probe body, and verification of operation of corrosion monitoring computer and instrumentation.

  5. Local tolerance testing under REACH: Accepted non-animal methods are not on equal footing with animal tests.

    PubMed

    Sauer, Ursula G; Hill, Erin H; Curren, Rodger D; Raabe, Hans A; Kolle, Susanne N; Teubner, Wera; Mehling, Annette; Landsiedel, Robert

    2016-07-01

    In general, no single non-animal method can cover the complexity of any given animal test. Therefore, fixed sets of in vitro (and in chemico) methods have been combined into testing strategies for skin and eye irritation and skin sensitisation testing, with pre-defined prediction models for substance classification. Many of these methods have been adopted as OECD test guidelines. Various testing strategies have been successfully validated in extensive in-house and inter-laboratory studies, but they have not yet received formal acceptance for substance classification. Therefore, under the European REACH Regulation, data from testing strategies can, in general, only be used in so-called weight-of-evidence approaches. While animal testing data generated under the specific REACH information requirements are per se sufficient, the sufficiency of weight-of-evidence approaches can be questioned under the REACH system, and further animal testing can be required. This constitutes an imbalance between the regulatory acceptance of data from approved non-animal methods and animal tests that is not justified on scientific grounds. To ensure that testing strategies for local tolerance testing truly serve to replace animal testing for the REACH registration 2018 deadline (when the majority of existing chemicals have to be registered), clarity on their regulatory acceptance as complete replacements is urgently required. PMID:27494627

  6. Nevada Test Site Waste Acceptance Criteria (NTSWAC), Rev. 7-01

    SciTech Connect

    NSTec Environmental Management

    2009-05-01

    This document establishes the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, Nevada Test Site Waste Acceptance Criteria (NTSWAC). The NTSWAC provides the requirements, terms, and conditions under which the Nevada Test Site (NTS) will accept low-level radioactive waste and mixed low-level waste for disposal. The NTSWAC includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the NTS Area 3 and Area 5 Radioactive Waste Management Complex for disposal.

  7. W-026 acceptance test report plant control system hardware (submittal {number_sign} 220.C)

    SciTech Connect

    Watson, T.L., Fluor Daniel Hanford

    1997-02-14

    Acceptance Testing of the WRAP1 Plant Control System Hardware was conducted throughout the construction of WRAPI with the final testing on the Process Area hardware being completed in November 1996. The hardware tests were broken out by the following functional areas; Local Control Units, Operator Control Stations in the WRAP Control Room, DMS Server, PCS Server, Operator Interface Units, printers, DMS terminals, WRAP Local Area Network/Communications, and bar code equipment. This document contains a completed copy of each of the hardware tests along with the applicable test logs and completed test exception reports.

  8. W-026 acceptance test plan plant control system hardware (submittal {number_sign} 216)

    SciTech Connect

    Watson, T.L., Fluor Daniel Hanford

    1997-02-14

    Acceptance Testing of the WRAP 1 Plant Control System Hardware will be conducted throughout the construction of WRAP I with the final testing on the Process Area hardware being completed in November 1996. The hardware tests will be broken out by the following functional areas; Local Control Units, Operator Control Stations in the WRAP Control Room, DMS Server, PCS Server, Operator Interface Units, printers, DNS terminals, WRAP Local Area Network/Communications, and bar code equipment. This document will contain completed copies of each of the hardware tests along with the applicable test logs and completed test exception reports.

  9. 105 K east ion exchange and cartridge filter restart instrumentation acceptance test report

    SciTech Connect

    Whitehurst, R.

    1996-01-08

    Acceptance Test Report following the completion of ATP-012 for the 105KE CP-A and CP-A Computer and PLC Panels. The test was conducted from 11/13/95 to 12/11/95. Three test discrepancies were generated during the ATP and all were dispositioned and closed. All sections were completed except Section 5.9 which was deleted per ECN 190556.

  10. Results of a Feasibility and Acceptability Trial of an Online Smoking Cessation Program Targeting Young Adult Nondaily Smokers

    PubMed Central

    Berg, Carla J.; Schauer, Gillian L.

    2012-01-01

    Despite increases in nondaily smoking among young adults, no prior research has aimed to develop and test an intervention targeting this group. Thus, we aimed to develop and test the feasibility, acceptability, and potential effectiveness of an online intervention targeting college student nondaily smokers. We conducted a one-arm feasibility and acceptability trial of a four-week online intervention with weekly contacts among 31 college student nondaily smokers. We conducted assessments at baseline (B), end of treatment (EOT), and six-week followup (FU). We maintained a 100% retention rate over the 10-week period. Google Analytics data indicated positive utilization results, and 71.0% were satisfied with the program. There were increases (P < .001) in the number of people refraining from smoking for the past 30 days and reducing their smoking from B to EOT and to FU, with additional individuals reporting being quit despite recent smoking. Participants also increased in their perceptions of how bothersome secondhand smoke is to others (P < .05); however, no other attitudinal variables were altered. Thus, this intervention demonstrated feasibility, acceptability, and potential effectiveness among college-aged nondaily smokers. Additional research is needed to understand how nondaily smokers define cessation, improve measures for cessation, and examine theoretical constructs related to smoking among this population. PMID:22570666

  11. Full-Scale Cask Testing and Public Acceptance of Spent Nuclear Fuel Shipments - 12254

    SciTech Connect

    Dilger, Fred; Halstead, Robert J.; Ballard, James D.

    2012-07-01

    Full-scale physical testing of spent fuel shipping casks has been proposed by the National Academy of Sciences (NAS) 2006 report on spent nuclear fuel transportation, and by the Presidential Blue Ribbon Commission (BRC) on America's Nuclear Future 2011 draft report. The U.S. Nuclear Regulatory Commission (NRC) in 2005 proposed full-scale testing of a rail cask, and considered 'regulatory limits' testing of both rail and truck casks (SRM SECY-05-0051). The recent U.S. Department of Energy (DOE) cancellation of the Yucca Mountain project, NRC evaluation of extended spent fuel storage (possibly beyond 60-120 years) before transportation, nuclear industry adoption of very large dual-purpose canisters for spent fuel storage and transport, and the deliberations of the BRC, will fundamentally change assumptions about the future spent fuel transportation system, and reopen the debate over shipping cask performance in severe accidents and acts of sabotage. This paper examines possible approaches to full-scale testing for enhancing public confidence in risk analyses, perception of risk, and acceptance of spent fuel shipments. The paper reviews the literature on public perception of spent nuclear fuel and nuclear waste transportation risks. We review and summarize opinion surveys sponsored by the State of Nevada over the past two decades, which show consistent patterns of concern among Nevada residents about health and safety impacts, and socioeconomic impacts such as reduced property values along likely transportation routes. We also review and summarize the large body of public opinion survey research on transportation concerns at regional and national levels. The paper reviews three past cask testing programs, the way in which these cask testing program results were portrayed in films and videos, and examines public and official responses to these three programs: the 1970's impact and fire testing of spent fuel truck casks at Sandia National Laboratories, the 1980's

  12. 40 CFR 799.12 - Test results.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 33 2013-07-01 2013-07-01 false Test results. 799.12 Section 799.12...) IDENTIFICATION OF SPECIFIC CHEMICAL SUBSTANCE AND MIXTURE TESTING REQUIREMENTS General Provisions § 799.12 Test results. Except as set forth in specific chemical test rules in subpart B of this part, a positive...

  13. 40 CFR 799.12 - Test results.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 32 2011-07-01 2011-07-01 false Test results. 799.12 Section 799.12...) IDENTIFICATION OF SPECIFIC CHEMICAL SUBSTANCE AND MIXTURE TESTING REQUIREMENTS General Provisions § 799.12 Test results. Except as set forth in specific chemical test rules in subpart B of this part, a positive...

  14. 40 CFR 799.12 - Test results.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 32 2014-07-01 2014-07-01 false Test results. 799.12 Section 799.12...) IDENTIFICATION OF SPECIFIC CHEMICAL SUBSTANCE AND MIXTURE TESTING REQUIREMENTS General Provisions § 799.12 Test results. Except as set forth in specific chemical test rules in subpart B of this part, a positive...

  15. Physics of Colloids in Space--Plus (PCS+) Experiment Completed Flight Acceptance Testing

    NASA Technical Reports Server (NTRS)

    Doherty, Michael P.

    2004-01-01

    The Physics of Colloids in Space--Plus (PCS+) experiment successfully completed system-level flight acceptance testing in the fall of 2003. This testing included electromagnetic interference (EMI) testing, vibration testing, and thermal testing. PCS+, an Expedite the Process of Experiments to Space Station (EXPRESS) Rack payload will deploy a second set of colloid samples within the PCS flight hardware system that flew on the International Space Station (ISS) from April 2001 to June 2002. PCS+ is slated to return to the ISS in late 2004 or early 2005.

  16. Small, high-pressure ratio compressor mechanical acceptance test, volume 2

    NASA Technical Reports Server (NTRS)

    Metty, G. R.; Shoup, W. I.

    1973-01-01

    The fabrication and mechanical testing of the high-pressure-ratio compressor are reported. Mechanical testing was performed to demonstrate overspeed capability, adequate rotor dynamics, electrical isolation of the gas bearing trunnion mounted diffuser and shroud and the effect of operating parameters (speed and pressure ratio) on clearance of the compressor test rig. The speed range covered was 20 to 120 percent of rated speed (80,000 rpm). Following these tests an acceptance test which consisted of a 5 hour run at 80,000 rpm was made with approximately design impeller to shroud clearances. For Vol. 1, see N73-26483.

  17. Advanced Stirling Convertor Dynamic Test Approach and Results

    NASA Technical Reports Server (NTRS)

    Meer, David W.; Hill, Dennis; Ursic, Joseph

    2009-01-01

    The U.S. Department of Energy (DOE), Lockheed Martin (LM), and NASA Glenn Research Center (GRC) have been developing the Advanced Stirling Radioisotope Generator (ASRG) for use as a power system for space science missions. As part of the extended operation testing of this power system, the Advanced Stirling Converters (ASC) at NASA John H. Glenn Research Center undergo a vibration test sequence intended to simulate the vibration history of an ASC used in an ASRG for a space mission. This sequence includes testing at Workmanship and Flight Acceptance levels interspersed with periods of extended operation to simulate pre and post fueling. The final step in the test sequence utilizes additional testing at Flight Acceptance levels to simulate launch. To better replicate the acceleration profile seen by an ASC incorporated into an ASRG, the input spectra used in testing the convertors was modified based on dynamic testing of the ASRG Engineering Unit ( ASRG-EU) at Lockheed Martin. This paper presents the vibration test plan for current and future ASC units, including the modified input spectra, and the results of recent tests using these spectra. The test results include data from several accelerometers mounted on the convertors as well as the piston position and output power variables.

  18. Integrating Telemedicine for Disaster Response: Testing the Emergency Telemedicine Technology Acceptance Model

    ERIC Educational Resources Information Center

    Davis, Theresa M.

    2013-01-01

    Background: There is little evidence that technology acceptance is well understood in healthcare. The hospital environment is complex and dynamic creating a challenge when new technology is introduced because it impacts current processes and workflows which can significantly affect patient care delivery and outcomes. This study tested the effect…

  19. A FORTRAN IV Program for Multiple-choice Tests with Predetermined Minimal Acceptable Performance Levels

    ERIC Educational Resources Information Center

    Noe, Michael J.

    1976-01-01

    A Fortran IV multiple choice test scoring program for an IBM 370 computer is described that computes minimally acceptable performance levels and compares student scores to these levels. The program accomodates up to 500 items with no more than nine alternatives from a group of examinees numbering less than 10,000. (Author)

  20. 14 CFR 91.1071 - Crewmember: Tests and checks, grace provisions, training to accepted standards.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... performance to the person conducting the check, the program manager may not use the pilot, nor may the pilot... OPERATING AND FLIGHT RULES Fractional Ownership Operations Program Management § 91.1071 Crewmember: Tests... provisions, training to accepted standards. 91.1071 Section 91.1071 Aeronautics and Space FEDERAL...

  1. 40 CFR 600.009-85 - Hearing on acceptance of test data.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 30 2011-07-01 2011-07-01 false Hearing on acceptance of test data. 600.009-85 Section 600.009-85 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) ENERGY POLICY FUEL ECONOMY AND CARBON-RELATED EXHAUST EMISSIONS OF MOTOR VEHICLES Fuel Economy and...

  2. 46 CFR 160.062-8 - Procedures for acceptance of testing facility.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 6 2014-10-01 2014-10-01 false Procedures for acceptance of testing facility. 160.062-8 Section 160.062-8 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Releases. Lifesaving Equipment, Hydraulic and Manual § 160.062-8...

  3. Acceptance Test Report for Fourth-Generation Hanford Corrosion Monitoring Cabinet

    SciTech Connect

    NORMAN, E.C.

    2000-10-23

    This Acceptance Test Plan (ATP) will document the satisfactory operation of the third-generation corrosion monitoring cabinet (Hiline Engineering Part No.0004-CHM-072-C01). This ATP will be performed by the manufacturer of the cabinet prior to delivery to the site. The objective of this procedure is to demonstrate and document the acceptance of the corrosion monitoring cabinet. The test will consist of a continuity test of the cabinet wiring from the end of cable to be connected to corrosion probe, through the appropriate intrinsic safety barriers and out to the 15 pin D-shell connectors to be connected to the corrosion monitoring instrument. Additional testing will be performed using a constant current and voltage source provided by the corrosion monitoring hardware manufacturer to verify proper operation of corrosion monitoring instrumentation.

  4. Test 6, Test 7, and Gas Standard Analysis Results

    NASA Technical Reports Server (NTRS)

    Perez, Horacio, III

    2007-01-01

    This viewgraph presentation shows results of analyses on odor, toxic off gassing and gas standards. The topics include: 1) Statistical Analysis Definitions; 2) Odor Analysis Results NASA Standard 6001 Test 6; 3) Toxic Off gassing Analysis Results NASA Standard 6001 Test 7; and 4) Gas Standard Results NASA Standard 6001 Test 7;

  5. W-026, acceptance test report TRU empty drum compactor (submittal{number_sign}634)

    SciTech Connect

    Watson, T.L.

    1997-06-18

    On 10/19/96 and 10/21/96, the 06/04/96 version of the Empty Drum Compactor Acceptance Test Procedure was used to perform tests by INET Corporation at the Hanford WRAP facility. The INET compaction components were installed in the Diversified glovebox. The Diversified glovebox and cart and the INET compaction components, EDC HPU and drum centering device constitute the Empty Drum Compactor.

  6. Scaling of Lift Degradation Due to Anti-Icing Fluids Based Upon the Aerodynamic Acceptance Test

    NASA Technical Reports Server (NTRS)

    Broeren, Andy; Riley, Jim

    2012-01-01

    In recent years, the FAA has worked with Transport Canada, National Research Council Canada (NRC) and APS Aviation, Inc. to develop allowance times for aircraft operations in ice-pellet precipitation. These allowance times are critical to ensure safety and efficient operation of commercial and cargo flights. Wind-tunnel testing with uncontaminated anti-icing fluids and fluids contaminated with simulated ice pellets had been carried out at the NRC Propulsion and Icing Wind Tunnel (PIWT) to better understand the flow-off characteristics and resulting aerodynamic effects. The percent lift loss on the thin, high-performance wing model tested in the PIWT was determined at 8 deg. angle of attack and used as one of the evaluation criteria in determining the allowance times. Because it was unclear as to how performance degradations measured on this model were relevant to an actual airplane configuration, some means of interpreting the wing model lift loss was deemed necessary. This paper describes how the lift loss was related to the loss in maximum lift of a Boeing 737-200ADV airplane through the Aerodynamic Acceptance Test (AAT) performed for fluids qualification. A loss in maximum lift coefficient of 5.24% on the B737-200ADV airplane (which was adopted as the threshold in the AAT) corresponds to a lift loss of 7.3% on the PIWT model at 8 deg. angle of attack. There is significant scatter in the data used to develop the correlation related to varying effects of the anti-icing fluids that were tested and other factors. A statistical analysis indicated the upper limit of lift loss on the PIWT model was 9.2%. Therefore, for cases resulting in PIWT model lift loss from 7.3% to 9.2%, extra scrutiny of the visual observations is required in evaluating fluid performance with contamination.

  7. Scaling of Lift Degradation Due to Anti-Icing Fluids Based Upon the Aerodynamic Acceptance Test

    NASA Technical Reports Server (NTRS)

    Broeren, Andy P.; Riley, James T.

    2012-01-01

    In recent years, the FAA has worked with Transport Canada, National Research Council Canada (NRC) and APS Aviation, Inc. to develop allowance times for aircraft operations in ice-pellet precipitation. These allowance times are critical to ensure safety and efficient operation of commercial and cargo flights. Wind-tunnel testing with uncontaminated anti-icing fluids and fluids contaminated with simulated ice pellets had been carried out at the NRC Propulsion and Icing Wind Tunnel (PIWT) to better understand the flowoff characteristics and resulting aerodynamic effects. The percent lift loss on the thin, high-performance wing model tested in the PIWT was determined at 8 angle of attack and used as one of the evaluation criteria in determining the allowance times. Because it was unclear as to how performance degradations measured on this model were relevant to an actual airplane configuration, some means of interpreting the wing model lift loss was deemed necessary. This paper describes how the lift loss was related to the loss in maximum lift of a Boeing 737-200ADV airplane through the Aerodynamic Acceptance Test (AAT) performed for fluids qualification. A loss in maximum lift coefficient of 5.24 percent on the B737-200ADV airplane (which was adopted as the threshold in the AAT) corresponds to a lift loss of 7.3 percent on the PIWT model at 8 angle of attack. There is significant scatter in the data used to develop the correlation related to varying effects of the anti-icing fluids that were tested and other factors. A statistical analysis indicated the upper limit of lift loss on the PIWT model was 9.2 percent. Therefore, for cases resulting in PIWT model lift loss from 7.3 to 9.2 percent, extra scrutiny of the visual observations is required in evaluating fluid performance with contamination.

  8. Acceptability and Feasibility of HIV Self-Testing Among Transgender Women in San Francisco: A Mixed Methods Pilot Study.

    PubMed

    Lippman, Sheri A; Moran, Lissa; Sevelius, Jae; Castillo, Leslie S; Ventura, Angel; Treves-Kagan, Sarah; Buchbinder, Susan

    2016-04-01

    An estimated one in four transgender women (trans women) in the U.S. are infected with HIV. Rates of HIV testing are not commensurate with their risk, necessitating alternative strategies for early detection and care. We explored the feasibility and acceptability of HIV self-testing (HIVST) with 50 HIV-negative adult trans women in San Francisco. Participants received three self-test kits to perform once a month. Acceptability and behavioral surveys were collected as were 11 in-depth interviews (IDIs). Among 50 participants, 44 reported utilizing HIVST at least once; 94 % reported the test easy to use; 93 % said results were easy to read; and 91 % would recommend it to others. Most participants (68 %) preferred HIVST to clinic-based testing, although price was a key barrier to uptake. IDIs revealed a tension between desires for privacy versus support found at testing sites. HIVST for trans women was acceptable and feasible and requires careful consideration of linkage to support services. PMID:26511864

  9. Acceptance test procedure, 241-SY-101/241-C-106 shot loading system

    SciTech Connect

    Ostrom, M.J.

    1994-11-01

    This Acceptance Test Procedure is for the 241-SY-101/241-C-106 Shot Loading System. The procedure will test the components of the Shot Loading System and its capability of adequately loading shot into the annular space of the Container. The loaded shot will provide shielding as required for transporting and storage of a contaminated pump after removal from the tank. This test serves as verification that the SLS is acceptable for use in the pump removal operations for Tanks 241-SY-101, 241-C-106 and 241-AY-102. The pump removal operation for these three tanks will be performed by two different organizations with different equipment, but the Shot Loading System will be compatible between the two operations.

  10. Accuracy and Acceptability of Oral Fluid HIV Self-Testing in a General Adult Population in Kenya.

    PubMed

    Kurth, Ann E; Cleland, Charles M; Chhun, Nok; Sidle, John E; Were, Edwin; Naanyu, Violet; Emonyi, Wilfred; Macharia, Stephen M; Sang, Edwin; Siika, Abraham M

    2016-04-01

    We evaluated performance, accuracy, and acceptability parameters of unsupervised oral fluid (OF) HIV self-testing (HIVST) in a general population in western Kenya. In a prospective validation design, we enrolled 240 adults to perform rapid OF HIVST and compared results to staff administered OF and rapid fingerstick tests. All reactive, discrepant, and a proportion of negative results were confirmed with lab ELISA. Twenty participants were video-recorded conducting self-testing. All participants completed a staff administered survey before and after HIVST to assess attitudes towards OF HIVST acceptability. HIV prevalence was 14.6 %. Thirty-six of the 239 HIVSTs were invalid (15.1 %; 95 % CI 11.1-20.1 %), with males twice as likely to have invalid results as females. HIVST sensitivity was 89.7 % (95 % CI 73-98 %) and specificity was 98 % (95 % CI 89-99 %). Although sensitivity was somewhat lower than expected, there is clear interest in, and high acceptability (94 %) of OF HIV self-testing. PMID:26438487

  11. Development and Validation of the Controller Acceptance Rating Scale (CARS): Results of Empirical Research

    NASA Technical Reports Server (NTRS)

    Lee, Katharine K.; Kerns, Karol; Bone, Randall

    2001-01-01

    The measurement of operational acceptability is important for the development, implementation, and evolution of air traffic management decision support tools. The Controller Acceptance Rating Scale was developed at NASA Ames Research Center for the development and evaluation of the Passive Final Approach Spacing Tool. CARS was modeled after a well-known pilot evaluation rating instrument, the Cooper-Harper Scale, and has since been used in the evaluation of the User Request Evaluation Tool, developed by MITRE's Center for Advanced Aviation System Development. In this paper, we provide a discussion of the development of CARS and an analysis of the empirical data collected with CARS to examine construct validity. Results of intraclass correlations indicated statistically significant reliability for the CARS. From the subjective workload data that were collected in conjunction with the CARS, it appears that the expected set of workload attributes was correlated with the CARS. As expected, the analysis also showed that CARS was a sensitive indicator of the impact of decision support tools on controller operations. Suggestions for future CARS development and its improvement are also provided.

  12. Possibilities and acceptance of mobile information technologies for the elderly - first results of an empirical study.

    PubMed

    Szarvas, Ildikó; Nitsch, Manuela; Lambacher, Oliver; Howe, Jürgen; Reichwaldt, Nina; von Bargen, Tobias; Haux, Reinhold

    2013-01-01

    This paper summarizes the results of a questionnaire-study conducted for the project "Safe and mobile through accompanying assistance systems" (SIMBA) founded by the German Federal Ministry of Education and Research. The study analyzes the mobility requirements and obstacles of the 55 yearold and older seniors in three age-groups (N=210) to develop suitable health-enabling technologies. It focuses on the mobility of the elderly on foot, by public transport, by bicycle and by taxi. The usage and the acceptance of existing mobile devices are determined, to select a suitable terminal for assistance systems. The results show, that although public transport is a very important way of travelling for seniors, its role decreases with higher age. Above the age of 65 years only a small fraction of seniors uses new communication technologies. This implies that smartphones as mobility aids are only suitable for the youngest group of seniors and for future, perhaps more technology-friendly generations. PMID:23920722

  13. Waste Acceptance Testing of Secondary Waste Forms: Cast Stone, Ceramicrete and DuraLith

    SciTech Connect

    Mattigod, Shas V.; Westsik, Joseph H.; Chung, Chul-Woo; Lindberg, Michael J.; Parker, Kent E.

    2011-08-12

    To support the selection of a waste form for the liquid secondary wastes from WTP, Washington River Protection Solutions has initiated secondary-waste-form testing work at Pacific Northwest National Laboratory (PNNL). In anticipation of a down-selection process for a waste form for the Solidification Treatment Unit to be added to the ETF, PNNL is conducting tests on four candidate waste forms to evaluate their ability to meet potential waste acceptance criteria for immobilized secondary wastes that would be placed in the IDF. All three waste forms demonstrated compressive strengths above the minimum 3.45 MPa (500 psi) set as a target for cement-based waste forms. Further, none of the waste forms showed any significant degradation in compressive strength after undergoing thermal cycling (30 cycles in a 10 day period) between -40 C and 60 C or water immersion for 90 days. The three leach test methods are intended to measure the diffusion rates of contaminants from the waste forms. Results are reported in terms of diffusion coefficients and a leachability index (LI) calculated based on the diffusion coefficients. A smaller diffusion coefficient and a larger LI are desired. The NRC, in its Waste Form Technical Position (NRC 1991), provides recommendations and guidance regarding methods to demonstrate waste stability for land disposal of radioactive waste. Included is a recommendation to conduct leach tests using the ANS 16.1 method. The resulting leachability index (LI) should be greater than 6.0. For Hanford secondary wastes, the LI > 6.0 criterion applies to sodium leached from the waste form. For technetium and iodine, higher targets of LI > 9 for Tc and LI > 11 for iodine have been set based on early waste-disposal risk and performance assessment analyses. The results of these three leach tests conducted for a total time between 11days (ASTM C1308) to 90 days (ANS 16.1) showed: (1) Technetium diffusivity: ANSI/ANS 16.1, ASTM C1308, and EPA 1315 tests indicated that

  14. Acceptability and Feasibility of Sexually Transmitted Infection Testing and Treatment among Pregnant Women in Gaborone, Botswana, 2015.

    PubMed

    Wynn, Adriane; Ramogola-Masire, Doreen; Gaolebale, Ponatshego; Moshashane, Neo; Agatha Offorjebe, Ogechukwu; Arena, Kaitlin; Klausner, Jeffrey D; Morroni, Chelsea

    2016-01-01

    Introduction. Chlamydia trachomatis (CT), Neisseria gonorrhoeae (NG), and Trichomonas vaginalis (TV) are curable sexually transmitted infections (STIs) that can cause adverse maternal and birth outcomes. Most countries do not conduct routine testing during antenatal care. We present data on the acceptability and feasibility of testing and treating pregnant women for STIs in an antenatal clinic in Gaborone, Botswana. Materials and Methods. We offered CT, NG, and TV testing using self-collected vaginal swabs to eligible pregnant women. Participants received same-day test results. Those who tested positive were given treatment. Results. Among the 225 women who were eligible and recruited, 200 (89%) agreed to participate. The median age of our study sample was 30 years; most were unmarried (77%), with a median gestational age of 27 weeks and a 23% HIV prevalence. All participants received their results with at least 72% (n = 143) on the same day. Thirty participants (15%) tested positive for an STI, all were treated, and 24 (80%) were treated on the same day. Conclusion. The acceptability of STI testing was high, and the intervention was feasible. This study provides support for continued research into STI prevalence, cost-effectiveness, and the association of STIs with adverse maternal and infant outcomes. PMID:27119076

  15. Acceptability and Feasibility of Sexually Transmitted Infection Testing and Treatment among Pregnant Women in Gaborone, Botswana, 2015

    PubMed Central

    Wynn, Adriane; Ramogola-Masire, Doreen; Gaolebale, Ponatshego; Moshashane, Neo; Agatha Offorjebe, Ogechukwu; Arena, Kaitlin; Klausner, Jeffrey D.; Morroni, Chelsea

    2016-01-01

    Introduction. Chlamydia trachomatis (CT), Neisseria gonorrhoeae (NG), and Trichomonas vaginalis (TV) are curable sexually transmitted infections (STIs) that can cause adverse maternal and birth outcomes. Most countries do not conduct routine testing during antenatal care. We present data on the acceptability and feasibility of testing and treating pregnant women for STIs in an antenatal clinic in Gaborone, Botswana. Materials and Methods. We offered CT, NG, and TV testing using self-collected vaginal swabs to eligible pregnant women. Participants received same-day test results. Those who tested positive were given treatment. Results. Among the 225 women who were eligible and recruited, 200 (89%) agreed to participate. The median age of our study sample was 30 years; most were unmarried (77%), with a median gestational age of 27 weeks and a 23% HIV prevalence. All participants received their results with at least 72% (n = 143) on the same day. Thirty participants (15%) tested positive for an STI, all were treated, and 24 (80%) were treated on the same day. Conclusion. The acceptability of STI testing was high, and the intervention was feasible. This study provides support for continued research into STI prevalence, cost-effectiveness, and the association of STIs with adverse maternal and infant outcomes. PMID:27119076

  16. Usage and acceptability of HIV self-testing in men who have sex with men in Hong Kong.

    PubMed

    Wong, Horas Tze Hoo; Tam, Hoi Yan; Chan, Denise Pui Chung; Lee, Shui Shan

    2015-03-01

    Whilst studies on over-the-counter HIV tests continue to accumulate after FDA's approval of OraQuick Advance in 2012, few have focused on men who have sex with men (MSM) in Asian cities. An internet survey was conducted on 1,122 MSM in Hong Kong, revealing a low usage (6.1 %) and acceptability rate (43.8 %) on self-testing despite its availability in the market. Hierarchical logistic regression models showed that having received relevant information and users' attitudes on self-testing were the determinants of usage and acceptability. These factors had greater effects than sexual behaviors and social-networking on MSM's decision on self-testing. Majority of ever self-testers only repeated the self-test after a non-negative result, and overall only 26.6 % went for a formal test subsequent to the self-test. Concerns regarding the tests' accuracy were expressed by respondents. In conclusion, appropriate and accessible information and evidence-based guidance are needed to incorporate self-testing into HIV prevention strategies targeting MSM. PMID:25145608

  17. Development and integration of the Army's Advanced Multispectral Simulation Test Acceptance Resource (AMSTAR) HWIL facilities

    NASA Astrophysics Data System (ADS)

    LeSueur, Kenneth G.; Lowry, William; Morris, Joe

    2006-05-01

    The Advanced Multispectral Simulation Test Acceptance Resource (AMSTAR) is a suite of state-of-the-art hardware-in-the-loop (HWIL) simulation / test capabilities designed to meet the life-cycle testing needs of multi-spectral systems. This paper presents the major AMSTAR facility design concepts and each of the Millimeter Wave (MMW), Infrared (IR), and Semi-Active Laser (SAL) in-band scene generation and projection system designs. The emergence of Multispectral sensors in missile systems necessitates capabilities such as AMSTAR to simultaneous project MMW, IR, and SAL wave bands into a common sensor aperture.

  18. Development and integration of the Army's advanced multispectral simulation test acceptance resource (AMSTAR) HWIL facilities

    NASA Astrophysics Data System (ADS)

    LeSueur, Kenneth G.; Lowry, William; Morris, Joe

    2005-05-01

    The Advanced Multispectral Simulation Test Acceptance Resource (AMSTAR) is a suite of state-of-the-art Hardware-In-the-Loop (HWIL) simulation / test capabilities designed to meet the life-cycle testing needs of multi-spectral systems. This paper presents the major AMSTAR facility design concepts and each of the Millimeter Wave (MMW), Infrared (IR), and Semi-Active Laser (SAL) in-band scene generation and projection system designs. The emergence of Multispectral sensors in missile systems necessitates capabilities such as AMSTAR to simultaneous project MMW, IR, and SAL wave bands into a common sensor aperture.

  19. Design tradeoffs in the development of the advanced multispectral simulation test acceptance resource (AMSTAR) HWIL facilities

    NASA Astrophysics Data System (ADS)

    LeSueur, Kenneth G.; Almendinger, Frank J.

    2007-04-01

    The Army's Advanced Multispectral Simulation Test Acceptance Resource (AMSTAR) is a suite of missile Hardware-In-the-Loop (HWIL) simulation / test capabilities designed to support testing from concept through production. This paper presents the design tradeoffs that were conducted in the development of the AMSTAR sensor stimulators and the flight motion simulators. The AMSTAR facility design includes systems to stimulate each of the Millimeter Wave (MMW), Infrared (IR), and Semi-Active Laser (SAL) sensors. The flight motion simulator (FMS) performance was key to the success of the simulation but required many concessions to accommodate the design considerations for the tri-mode stimulation systems.

  20. Testing a developmental cascade model of emotional and social competence and early peer acceptance

    PubMed Central

    Blandon, Alysia Y.; Calkins, Susan D.; Grimm, Kevin J.; Keane, Susan P.; O’Brien, Marion

    2011-01-01

    A developmental cascade model of early emotional and social competence predicting later peer acceptance was examined in a community sample of 440 children across the ages of 2 to 7. Children’s externalizing behavior, emotion regulation, social skills within the classroom and peer acceptance were examined utilizing a multitrait-multimethod approach. A series of longitudinal cross-lag models that controlled for shared rater variance were fit using structural equation modeling. Results indicated there was considerable stability in children’s externalizing behavior problems and classroom social skills over time. Contrary to expectations, there were no reciprocal influences between externalizing behavior problems and emotion regulation, though higher levels of emotion regulation were associated with decreases in subsequent levels of externalizing behaviors. Finally, children’s early social skills also predicted later peer acceptance. Results underscore the complex associations among emotional and social functioning across early childhood. PMID:20883578

  1. Altitude Compensating Nozzle Cold Flow Test Results

    NASA Technical Reports Server (NTRS)

    Ruf, J. H.; McDaniels, D. M.

    2002-01-01

    A suite of four altitude compensating nozzle (ACN) concepts were evaluated by NASA MSFC in the Nozzle Test Facility. The ACN concepts were a dual bell, a dual expander, an annular plug nozzle and an expansion deflection nozzle. Two reference bell nozzles were also tested. Axial thrust and nozzle wall static pressures were measured for each nozzle over a wide range of nozzle pressure ratios. The nozzle hardware and test program are described. Sample test results are presented.

  2. Reproducibility of liquid oxygen impact test results

    NASA Technical Reports Server (NTRS)

    Gayle, J. B.

    1975-01-01

    Results for 12,000 impacts on a wide range of materials were studied to determine the reproducibility of the liquid oxygen impact test method. Standard deviations representing the overall variability of results were in close agreement with the expected values for a binomial process. This indicates that the major source of variability is due to the go - no go nature of the test method and that variations due to sampling and testing operations were not significant.

  3. Using Test Results To Support Clinical Judgment.

    ERIC Educational Resources Information Center

    Silverman, Linda Kreger

    This paper recommends an evaluation procedure for gifted children which uses test results only to confirm the conclusions resulting from clinical evaluation that involves observation, discussion with the child, an interview with the parents, developmental milestones, and family history. It suggests that traditional test interpretation may lead to…

  4. Results of steel containment vessel model test

    SciTech Connect

    Luk, V.K.; Ludwigsen, J.S.; Hessheimer, M.F.; Komine, Kuniaki; Matsumoto, Tomoyuki; Costello, J.F.

    1998-05-01

    A series of static overpressurization tests of scale models of nuclear containment structures is being conducted by Sandia National Laboratories for the Nuclear Power Engineering Corporation of Japan and the US Nuclear Regulatory Commission. Two tests are being conducted: (1) a test of a model of a steel containment vessel (SCV) and (2) a test of a model of a prestressed concrete containment vessel (PCCV). This paper summarizes the conduct of the high pressure pneumatic test of the SCV model and the results of that test. Results of this test are summarized and are compared with pretest predictions performed by the sponsoring organizations and others who participated in a blind pretest prediction effort. Questions raised by this comparison are identified and plans for posttest analysis are discussed.

  5. Social trust, risk perceptions and public acceptance of recycled water: testing a social-psychological model.

    PubMed

    Ross, Victoria L; Fielding, Kelly S; Louis, Winnifred R

    2014-05-01

    Faced with a severe drought, the residents of the regional city of Toowoomba, in South East Queensland, Australia were asked to consider a potable wastewater reuse scheme to supplement drinking water supplies. As public risk perceptions and trust have been shown to be key factors in acceptance of potable reuse projects, this research developed and tested a social-psychological model of trust, risk perceptions and acceptance. Participants (N = 380) were surveyed a few weeks before a referendum was held in which residents voted against the controversial scheme. Analysis using structural equation modelling showed that the more community members perceived that the water authority used fair procedures (e.g., consulting with the community and providing accurate information), the greater their sense of shared identity with the water authority. Shared social identity in turn influenced trust via increased source credibility, that is, perceptions that the water authority is competent and has the community's interest at heart. The findings also support past research showing that higher levels of trust in the water authority were associated with lower perceptions of risk, which in turn were associated with higher levels of acceptance, and vice versa. The findings have a practical application for improving public acceptance of potable recycled water schemes. PMID:24603028

  6. Biological and chemical tests of contaminated soils to determine bioavailability and environmentally acceptable endpoints (EAE)

    SciTech Connect

    Montgomery, C.R.; Menzie, C.A.; Pauwells, S.J.

    1995-12-31

    The understanding of the concept of bioavailability of soil contaminants to receptors and its use in supporting the development of EAE is growing but still incomplete. Nonetheless, there is increased awareness of the importance of such data to determine acceptable cleanup levels and achieve timely site closures. This presentation discusses a framework for biological and chemical testing of contaminated soils developed as part of a Gas Research Institute (GRI) project entitled ``Environmentally Acceptable Endpoints in Soil Using a Risk Based Approach to Contaminated Site Management Based on Bioavailability of Chemicals in Soil.`` The presentation reviews the GRI program, and summarizes the findings of the biological and chemical testing section published in the GRI report. The three primary components of the presentation are: (1) defining the concept of bioavailability within the existing risk assessment paradigm, (2) assessing the usefulness of the existing tests to measure bioavailability and test frameworks used to interpret these measurements, and (3) suggesting how a small selection of relevant tests could be incorporated into a flexible testing scheme for soils to address this issue.

  7. Factors Associated with Acceptability of HIV Self-Testing Among Health Care Workers in Kenya

    PubMed Central

    Kalibala, Samuel; Tun, Waimar; Cherutich, Peter; Nganga, Anne; Oweya, Erick; Oluoch, Patricia

    2016-01-01

    Health care workers (HCWs) in sub-Saharan Africa are at a high risk of HIV infection from both sexual and occupational exposures. However, many do not seek HIV testing. This paper examines the acceptability of an unsupervised facility-based HIV self-testing (HIV-ST) intervention among HCWs and their partners and factors associated with uptake of HIVST among HCWs. HCWs in seven large Kenyan hospitals were invited to participate in pre-HIVST information sessions during which they were offered HIVST kits to take home for self-testing. A post-intervention survey was conducted among 765 HCWs. Forty-one percent attended the information session; of those, 89 % took the HIVST kits and of those, 85 % self-tested. Thirty-four percent of surveyed HCWs used the HIVST to test themselves. Of those who took the HIVST kit and had partners, 73 % gave the kit to their partner and 86 % of them indicated their partner self-tested. Factors positively associated with use of the HIVST on self were being female, being single, and being a HCW from Homa Bay Hospital (located in a high HIV prevalence area). HIVST is acceptable to HCWs and their partners. However, strategies are needed to increase HCWs attendance at pre-implementation information sessions. PMID:24974123

  8. Superconducting solenoid model magnet test results

    SciTech Connect

    Carcagno, R.; Dimarco, J.; Feher, S.; Ginsburg, C.M.; Hess, C.; Kashikhin, V.V.; Orris, D.F.; Pischalnikov, Y.; Sylvester, C.; Tartaglia, M.A.; Terechkine, I.; /Fermilab

    2006-08-01

    Superconducting solenoid magnets suitable for the room temperature front end of the Fermilab High Intensity Neutrino Source (formerly known as Proton Driver), an 8 GeV superconducting H- linac, have been designed and fabricated at Fermilab, and tested in the Fermilab Magnet Test Facility. We report here results of studies on the first model magnets in this program, including the mechanical properties during fabrication and testing in liquid helium at 4.2 K, quench performance, and magnetic field measurements. We also describe new test facility systems and instrumentation that have been developed to accomplish these tests.

  9. Galileo spacecraft system level environmental test results

    NASA Technical Reports Server (NTRS)

    Hoffman, A. R.; Schlue, J. W.

    1986-01-01

    Project Galileo, the United States' next planetary mission, will be launched by the Shuttle/Centaur in May 1986. The Galileo spacecraft consists of both a planetary Orbiter and an atmospheric Probe. The spacecraft was environmentally tested as a system in the fall and winter of 1984/1985 at the Jet Propulsion Laboratory. The protoflight qualification program consisted of vibration, acoustics, pyrotechnic shock, Electromagnetic Compatibility (EMC) and Solar Thermal Vacuum (STV) tests. This test program was accomplished on a large, complex, dual-spin spacecraft without the benefit of precursor spacecraft prototype tests. This paper discusses the objectives of these tests and the implementation, and summarizes the results.

  10. Engineering data transfer test with EDCARS using MIL-R-28002 (Raster). Laboratory Acceptance Test and User Application Test

    SciTech Connect

    Not Available

    1992-04-17

    This paper documents the results of a sequence of tests conducted to evaluate the DoD Computer-aided Acquisition and Logistic Support (CALS) data interchange capability of the Air Force Engineering Data Computer-Assisted Retrieval System (EDCARS). The CALS initiative specifies a standard digital interface to streamline the interchange of technical data between the DoD and the commercial sector. The CALS Test Network (CTN) is tasked to conduct tests of military standards which specify this digital interface. The testing results outlined in this report are intended to evaluate the EDCARS systems`s ability to sport CALS data interchanges and establish the level of technical data interoperability implemented at this DoD engineering data repository.

  11. Alternative filtration testing program: Pre-evaluation of test results

    SciTech Connect

    Georgeton, G.K.; Poirier, M.R.

    1990-09-28

    Based on results of testing eight solids removal technologies and one pretreatment option, it is recommended that a centrifugal ultrafilter and polymeric ultrafilter undergo further testing as possible alternatives to the Norton Ceramic filters. Deep bed filtration should be considered as a third alternative, if a backwashable cartridge filter is shown to be inefficient in separate testing.

  12. BWR Full Integral Simulation Test (FIST). Phase I test results

    SciTech Connect

    Hwang, W S; Alamgir, M; Sutherland, W A

    1984-09-01

    A new full height BWR system simulator has been built under the Full-Integral-Simulation-Test (FIST) program to investigate the system responses to various transients. The test program consists of two test phases. This report provides a summary, discussions, highlights and conclusions of the FIST Phase I tests. Eight matrix tests were conducted in the FIST Phase I. These tests have investigated the large break, small break and steamline break LOCA's, as well as natural circulation and power transients. Results and governing phenomena of each test have been evaluated and discussed in detail in this report. One of the FIST program objectives is to assess the TRAC code by comparisons with test data. Two pretest predictions made with TRACB02 are presented and compared with test data in this report.

  13. Space Suit Portable Life Support System (PLSS) 2.0 Pre-Installation Acceptance (PIA) Testing

    NASA Technical Reports Server (NTRS)

    Watts, Carly; Vogel, Matthew

    2016-01-01

    Following successful completion of the space suit Portable Life Support System (PLSS) 1.0 development and testing in 2011, the second system-level prototype, PLSS 2.0, was developed in 2012 to continue the maturation of the advanced PLSS design which is intended to reduce consumables, improve reliability and robustness, and incorporate additional sensing and functional capabilities over the current Space Shuttle/International Space Station Extravehicular Mobility Unit (EMU) PLSS. PLSS 2.0 represents the first attempt at a packaged design comprising first generation or later component prototypes and medium fidelity interfaces within a flight-like representative volume. Pre-Installation Acceptance (PIA) is carryover terminology from the Space Shuttle Program referring to the series of test sequences used to verify functionality of the EMU PLSS prior to installation into the Space Shuttle airlock for launch. As applied to the PLSS 2.0 development and testing effort, PIA testing designated the series of 27 independent test sequences devised to verify component and subsystem functionality, perform in situ instrument calibrations, generate mapping data to define set-points for control algorithms, evaluate hardware performance against advanced PLSS design requirements, and provide quantitative and qualitative feedback on evolving design requirements and performance specifications. PLSS 2.0 PIA testing was carried out from 3/20/13 - 3/15/14 using a variety of test configurations to perform test sequences that ranged from stand-alone component testing to system-level testing, with evaluations becoming increasingly integrated as the test series progressed. Each of the 27 test sequences was vetted independently, with verification of basic functionality required before completion. Because PLSS 2.0 design requirements were evolving concurrently with PLSS 2.0 PIA testing, the requirements were used as guidelines to assess performance during the tests; after the completion of PIA

  14. Space Suit Portable Life Support System (PLSS) 2.0 Pre-Installation Acceptance (PIA) Testing

    NASA Technical Reports Server (NTRS)

    Anchondo, Ian; Cox, Marlon; Meginnis, Carly; Westheimer, David; Vogel, Matt R.

    2016-01-01

    Following successful completion of the space suit Portable Life Support System (PLSS) 1.0 development and testing in 2011, the second system-level prototype, PLSS 2.0, was developed in 2012 to continue the maturation of the advanced PLSS design. This advanced PLSS is intended to reduce consumables, improve reliability and robustness, and incorporate additional sensing and functional capabilities over the current Space Shuttle/International Space Station Extravehicular Mobility Unit (EMU) PLSS. PLSS 2.0 represents the first attempt at a packaged design comprising first generation or later component prototypes and medium fidelity interfaces within a flight-like representative volume. Pre-Installation Acceptance (PIA) is carryover terminology from the Space Shuttle Program referring to the series of test sequences used to verify functionality of the EMU PLSS prior to installation into the Space Shuttle airlock for launch. As applied to the PLSS 2.0 development and testing effort, PIA testing designated the series of 27 independent test sequences devised to verify component and subsystem functionality, perform in situ instrument calibrations, generate mapping data, define set-points, evaluate control algorithms, evaluate hardware performance against advanced PLSS design requirements, and provide quantitative and qualitative feedback on evolving design requirements and performance specifications. PLSS 2.0 PIA testing was carried out in 2013 and 2014 using a variety of test configurations to perform test sequences that ranged from stand-alone component testing to system-level testing, with evaluations becoming increasingly integrated as the test series progressed. Each of the 27 test sequences was vetted independently, with verification of basic functionality required before completion. Because PLSS 2.0 design requirements were evolving concurrently with PLSS 2.0 PIA testing, the requirements were used as guidelines to assess performance during the tests; after the

  15. Salmonella mutagenicity test results for 250 chemicals

    SciTech Connect

    Haworth, S.; Lawlor, T.; Mortelmans, K.; Speck, W.; Zeiger, E.

    1983-01-01

    This publication is a presentation of Salmonella testing results on 250 coded chemicals, encompassing 370 tests. The majority of these results were previously summarized in issues of the National Toxicology Program Technical Bulletin. However, some interpretations were changed since publication in the NTP Bulletin, based upon a reevaluation of the data. The presentation here is designed both to summarize the results in the text and to present the data so that the reader has the opportunity of performing an independent evaluation of the data. The chemicals tested, their source, and purity (where known) are listed and their structures are given in Appendix 1.

  16. 46 CFR 159.007-7 - Application for acceptance for production inspections and tests: Coast Guard action.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 6 2013-10-01 2013-10-01 false Application for acceptance for production inspections and tests: Coast Guard action. 159.007-7 Section 159.007-7 Shipping COAST GUARD, DEPARTMENT OF....007-7 Application for acceptance for production inspections and tests: Coast Guard action. (a)...

  17. 46 CFR 159.007-7 - Application for acceptance for production inspections and tests: Coast Guard action.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 6 2014-10-01 2014-10-01 false Application for acceptance for production inspections and tests: Coast Guard action. 159.007-7 Section 159.007-7 Shipping COAST GUARD, DEPARTMENT OF....007-7 Application for acceptance for production inspections and tests: Coast Guard action. (a)...

  18. 46 CFR 159.007-7 - Application for acceptance for production inspections and tests: Coast Guard action.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 6 2011-10-01 2011-10-01 false Application for acceptance for production inspections and tests: Coast Guard action. 159.007-7 Section 159.007-7 Shipping COAST GUARD, DEPARTMENT OF....007-7 Application for acceptance for production inspections and tests: Coast Guard action. (a)...

  19. 46 CFR 159.007-7 - Application for acceptance for production inspections and tests: Coast Guard action.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Application for acceptance for production inspections and tests: Coast Guard action. 159.007-7 Section 159.007-7 Shipping COAST GUARD, DEPARTMENT OF....007-7 Application for acceptance for production inspections and tests: Coast Guard action. (a)...

  20. 10 CFR 26.91 - Acceptable devices for conducting initial and confirmatory tests for alcohol and methods of use.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Acceptable devices for conducting initial and confirmatory tests for alcohol and methods of use. 26.91 Section 26.91 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Collecting Specimens for Testing § 26.91 Acceptable devices for conducting...

  1. 10 CFR 26.91 - Acceptable devices for conducting initial and confirmatory tests for alcohol and methods of use.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Acceptable devices for conducting initial and confirmatory tests for alcohol and methods of use. 26.91 Section 26.91 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Collecting Specimens for Testing § 26.91 Acceptable devices for conducting...

  2. 10 CFR 26.91 - Acceptable devices for conducting initial and confirmatory tests for alcohol and methods of use.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Acceptable devices for conducting initial and confirmatory tests for alcohol and methods of use. 26.91 Section 26.91 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Collecting Specimens for Testing § 26.91 Acceptable devices for conducting...

  3. 10 CFR 26.91 - Acceptable devices for conducting initial and confirmatory tests for alcohol and methods of use.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Acceptable devices for conducting initial and confirmatory tests for alcohol and methods of use. 26.91 Section 26.91 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Collecting Specimens for Testing § 26.91 Acceptable devices for conducting...

  4. 10 CFR 26.91 - Acceptable devices for conducting initial and confirmatory tests for alcohol and methods of use.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Acceptable devices for conducting initial and confirmatory tests for alcohol and methods of use. 26.91 Section 26.91 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Collecting Specimens for Testing § 26.91 Acceptable devices for conducting...

  5. Preliminary Silver-hydrogen Cell Test Results

    NASA Technical Reports Server (NTRS)

    Lurie, C.

    1984-01-01

    Silver-hydrogen cells were tested. The objective of the test was to estimate useful life by operation at accelerated, simulated geosynchronous orbit conditions. Ten simulated seasons were run and are summarized. The results to-date reflect stable, trouble-free performance and indicate that the silver-hydrogen couple shows promise as a lightweight alternative to the nickel systems.

  6. Module Hipot and ground continuity test results

    NASA Technical Reports Server (NTRS)

    Griffith, J. S.

    1984-01-01

    Hipot (high voltage potential) and module frame continuity tests of solar energy conversion modules intended for deployment into large arrays are discussed. The purpose of the tests is to reveal potentially hazardous voltage conditions in installed modules, and leakage currents that may result in loss of power or cause ground fault system problems, i.e., current leakage potential and leakage voltage distribution. The tests show a combined failure rate of 36% (69% when environmental testing is included). These failure rates are believed easily corrected by greater care in fabrication.

  7. Results of the HESSI Test Mishap Investigation

    NASA Technical Reports Server (NTRS)

    Worth, Daniel B.; Phillips, Rodney N.; Kross, Dennis A. (Technical Monitor)

    2000-01-01

    On March 21, 2000, the High-Energy Solar Spectroscopic Imager (HESSI) spacecraft was subjected to a series of vibration tests at the Jet Propulsion Laboratory (JPL) as a part of its flight certification program. The structural qualification test, denoted as the sineburst test, subjected the spacecraft to a major overtest that resulted in significant structural damage to the spacecraft. The HESSI Test Mishap Investigation Board (MIB) was formed on March 24, 2000, in response to a NASA headquarters request. Board membership included experts from NASA and the University of California at Berkeley. This paper will present the investigation methods, findings, and lessons learned from the HESSI mishap.

  8. Recent Radiation Test Results for Power MOSFETs

    NASA Technical Reports Server (NTRS)

    Lauenstein, Jean-Marie; Topper, Alyson D.; Casey, Megan C.; Wilcox, Edward P.; Phan, Anthony M.; Kim, Hak S.; LaBel, Kenneth A.

    2013-01-01

    Single-event effect (SEE) and total ionizing dose (TID) test results are presented for various hardened and commercial power metal-oxide-semiconductor field effect transistors (MOSFETs), including vertical planar, trench, superjunction, and lateral process designs.

  9. Cone Penetrometer N Factor Determination Testing Results

    SciTech Connect

    Follett, Jordan R.

    2014-03-05

    This document contains the results of testing activities to determine the empirical 'N Factor' for the cone penetrometer in kaolin clay simulant. The N Factor is used to releate resistance measurements taken with the cone penetrometer to shear strength.

  10. ENRAF Series 854 Advanced Technology Gauge (ATG) with SPU II card for Leak Detector Use Acceptance Test Procedure

    SciTech Connect

    SMITH, S.G.

    1999-10-21

    The following Acceptance Test Procedure was written to test the ENRAF series 854 ATG with SPU II card prior to installation in the Tank Farms. The procedure sets various parameters and verifies the gauge and alarms functionality.

  11. Punch valve development testing: Low and high velocity test results

    SciTech Connect

    Replogle, W.C.; Brandon, S.L.

    1996-09-01

    This is a report on the use of quasi-static tests to predict fundamental parameters for punch valve development. This report summarizes the results from low and high velocity tests performed with 0.63 and 0.38 cm diameter plungers, 5 cm long penetrating aluminium and composite targets. The low velocity tests, 0.025 m/s, were performed to understand the effects and interactions of plunger diameter plunger tip shape, target material, and target support on penetration energy and plunger functionality. High velocity tests, 75 m/s, were compared to low velocity results.

  12. RTG performance on Galileo and Ulysses and Cassini test results

    SciTech Connect

    Kelly, C. Edward; Klee, Paul M.

    1997-01-10

    Power output from telemetry for the two Galileo RTGs are shown from the 1989 launch to the recent Jupiter encounter. Comparisons of predicted, measured and required performance are shown. Similar comparisons are made for the RTG on the Ulysses spacecraft which completed its planned mission in 1995. Also presented are test results from small scale thermoelectric modules and full scale converters performed for the Cassini program. The Cassini mission to Saturn is scheduled for an October 1997 launch. Small scale module test results on thermoelectric couples from the qualification and flight production runs are shown. These tests have exceeded 19,000 hours are continuing to provide increased confidence in the predicted long term performance of the Cassini RTGs. Test results are presented for full scale units both ETGs (E-6, E-7) and RTGs (F-2, F-5) along with mission power predictions. F-5, fueled in 1985, served as a spare for the Galileo and Ulysses missions and plays the same role in the Cassini program. It has successfully completed all acceptance testing. The ten years storage between thermal vacuum tests is the longest ever experienced by an RTG. The data from this test are unique in providing the effects of long term low temperature storage on power output. All ETG and RTG test results to date indicate that the power requirements of the Cassini spacecraft will be met. BOM and EOM power margins of at least five percent are predicted.

  13. RTG performance on Galileo and Ulysses and Cassini test results

    SciTech Connect

    Kelly, C.E.; Klee, P.M.

    1997-01-01

    Power output from telemetry for the two Galileo RTGs are shown from the 1989 launch to the recent Jupiter encounter. Comparisons of predicted, measured and required performance are shown. Similar comparisons are made for the RTG on the Ulysses spacecraft which completed its planned mission in 1995. Also presented are test results from small scale thermoelectric modules and full scale converters performed for the Cassini program. The Cassini mission to Saturn is scheduled for an October 1997 launch. Small scale module test results on thermoelectric couples from the qualification and flight production runs are shown. These tests have exceeded 19,000 hours are continuing to provide increased confidence in the predicted long term performance of the Cassini RTGs. Test results are presented for full scale units both ETGs (E-6, E-7) and RTGs (F-2, F-5) along with mission power predictions. F-5, fueled in 1985, served as a spare for the Galileo and Ulysses missions and plays the same role in the Cassini program. It has successfully completed all acceptance testing. The ten years storage between thermal vacuum tests is the longest ever experienced by an RTG. The data from this test are unique in providing the effects of long term low temperature storage on power output. All ETG and RTG test results to date indicate that the power requirements of the Cassini spacecraft will be met. BOM and EOM power margins of at least five percent are predicted. {copyright} {ital 1997 American Institute of Physics.}

  14. Adaptive structures - Test hardware and experimental results

    NASA Technical Reports Server (NTRS)

    Wada, Ben K.; Fanson, James L.; Chen, Gun-Shing; Kuo, Chin-Po

    1990-01-01

    The facilities and procedures used at JPL to test adaptive structures such as the large deployable reflector (LDR) are described and preliminary results are reported. The applications of adaptive structures in future NASA missions are outlined, and the techniques which are employed to modify damping, stiffness, and isolation characteristics, as well as geometric changes, are listed. The development of adaptive structures is shown to be effective as a result of new actuators and sensors, and examples are listed for categories such as fiber optics, shape-memory materials, piezoelectrics, and electrorheological fluids. Some ground test results are described for laboratory truss structures and truss test beds, which are shown to be efficient and easy to assemble in space. Adaptive structures are shown to be important for precision space structures such as the LDR, and can alleviate ground test requirements.

  15. CEBAF'S New RF Separator Structure Test Results

    SciTech Connect

    Reza Kazimi; Jock Fugitt; A. Krycuk; Charles Sinclair; Larry Turlington

    1993-05-01

    Prototypes of the rf separator for CEBAF have been made and successfully beam tested. The structure is a new design which has a high transverse shunt impedance together with a small transverse dimension compared to more conventional rf deflecting structures. Five rf separators will be used at CEBAF to allow beam from any one of the five recirculation passes to be delivered to any of the three experimental halls. The authors have already described the basic design of the structure and theoretical calculations. They have also reported some results from rf measurements and beam tests. In this paper they present more beam test results, their final design parameters, and test results of coupling two 1/2 wavelength cavities together.

  16. Women's interpretation of cervical smear test results.

    PubMed

    Philips, Z; Avis, M; Whynes, D K

    2004-06-01

    Screening for cervical cancer using the Papanicolaou smear test has been available in England since the 1960s, yet very little is known about how women interpret their test results. This questionnaire study required women to explain, in their own words, the meaning of normal and abnormal test results. It was discovered that the use of the word cell as a description of findings was extremely common, and that a proportion of subjects equated abnormal results with technical inadequacy. The frequency of circularity in the interpretations, i.e. interpreting 'normal' as 'not abnormal' and vice versa, was striking. Contrary to previous research, we find that, whilst many women interpret normal results as indicating the current absence of cancer, few appear to believe that future cancer is thereby definitively ruled out. By the same token, only a very small minority interpret abnormal results as definitive of cancer. PMID:15165270

  17. Test Result Management in Global Health Settings

    PubMed Central

    Palazuelos, Daniel; Payne, Jonathan D.

    2012-01-01

    OVERVIEW Across the globe, the ways in which patients' test results are managed are as varied as the many different types of healthcare systems that manage these data. The outcomes, however, are often not too dissimilar: too many clinically significant test results fall through the cracks. The consequences of not following up test results in a timely manner are serious and often devastating to patients: diagnoses are delayed, treatments are not initiated or altered in time, and diseases progress. In resource-poor settings, test results too commonly get filed away within the paper chart in ways that isolate them and prevent passage to future providers caring for a patient. To make matters worse, the onus to act upon these test results often rests on patients who need to return to the clinic within a specified timeframe in order to obtain their results but who may not have the means or are too ill to do so. Even in more developed healthcare settings that use electronic records, clinical data residing in the electronic medical record (EMR) are often stubbornly “static”—key pieces of clinical information are frequently not recognized, retrieved, or shared easily. In this way, EMRs are not unlike paper record systems, and therefore, EMRs alone will not solve this problem. To illustrate this problem, consider the case of a patient newly diagnosed with HIV in 3 different healthcare delivery settings. PMID:24278831

  18. Friction drive characterization breadboard: test results

    NASA Astrophysics Data System (ADS)

    Sedghi, B.; Lucuix, C.; Tortolani, J. M.; Brunetto, E.; Delrez, C.; Gabriel, E.

    2010-07-01

    The drive and bearing technologies have a major impact on the static and dynamic performance of steerable structures such as telescope and dome. Merging drive and bearing system into friction drive mechanical devices (bogie) can reduce the complexity and cost of the design. In the framework of ELT design study (European FP6) a breadboard test setup was realized to test and evaluate the static and dynamic behavior of such bogies. In this paper some of the characterization test results are presented. Characterization of the bogies and the setup structure in the frequency domain, quantification and measure of the most important parameters of the friction forces, the control of the bogies and the tracking performance of the test setup are among the main results discussed in this paper.

  19. International Space Station Environmental Control and Life Support System Acceptance Testing for the Pressurized Mating Adapters

    NASA Technical Reports Server (NTRS)

    Williams, David E.

    2008-01-01

    The International Space Station (ISS) Pressurized Mating Adapters (PMAs) Environmental Control and Life Support (ECLS) System is comprised of three subsystems: Atmosphere Control and Supply (ACS), Temperature and Humidity Control (THC), and Water Recovery and Management (WRM). PMAs 1 and 2 flew to ISS on Flight 2A and Pressurized Mating Adapter (PMA) 3 flew to ISS on Flight 3A. This paper provides a summary of the PMAs ECLS design and a detailed discussion of the ISS ECLS Acceptance Testing methodologies utilized for the PMAs.

  20. JPL pyro shock test approaches and results

    NASA Technical Reports Server (NTRS)

    Chang, Kurng Y.

    1986-01-01

    This paper presents the overall approach at JPL in performing spacecraft pyrotechnic shock qualification testing. Initially, the assembly shock requirements are developed early in the program based on previous spacecraft test experience and data. Pyrotechnic device development testing firings and spacecraft Development Test Model (DTM) pyro firings are then conducted to verify the adequacy of the assembly shock requirements and to determine the subsystem test firing and the subsequent system level test firing requirements. The electro-dynamic shaker, through shock synthesis techniques, is utilized to qualify the shock sensitive flight equipment with margins applied. Actual pyrotechnic device firings on spacecraft equipment or science instruments are performed when the influence of the pyros is localized and can be ignored at the system level. Full spacecraft system level shock tests, which include multiple firings of certain critical pyro devices, are conducted to verify the spacecraft design structural integrity and functions as well as to qualify hardware items which have not been previously qualified. These tests also provide a source of data from which assembly level requirements can be evaluated and compared. For example, during the Galileo program, the results demonstrated that good agreement between predicted and measured shock environments and adequate qualification of the flight spacecraft was achieved.

  1. Acceptance/operational test procedure 241-AN-107 Video Camera System

    SciTech Connect

    Pedersen, L.T.

    1994-11-18

    This procedure will document the satisfactory operation of the 241-AN-107 Video Camera System. The camera assembly, including camera mast, pan-and-tilt unit, camera, and lights, will be installed in Tank 241-AN-107 to monitor activities during the Caustic Addition Project. The camera focus, zoom, and iris remote controls will be functionally tested. The resolution and color rendition of the camera will be verified using standard reference charts. The pan-and-tilt unit will be tested for required ranges of motion, and the camera lights will be functionally tested. The master control station equipment, including the monitor, VCRs, printer, character generator, and video micrometer will be set up and performance tested in accordance with original equipment manufacturer`s specifications. The accuracy of the video micrometer to measure objects in the range of 0.25 inches to 67 inches will be verified. The gas drying distribution system will be tested to ensure that a drying gas can be flowed over the camera and lens in the event that condensation forms on these components. This test will be performed by attaching the gas input connector, located in the upper junction box, to a pressurized gas supply and verifying that the check valve, located in the camera housing, opens to exhaust the compressed gas. The 241-AN-107 camera system will also be tested to assure acceptable resolution of the camera imaging components utilizing the camera system lights.

  2. Cascade Distiller System Performance Testing Interim Results

    NASA Technical Reports Server (NTRS)

    Callahan, Michael R.; Pensinger, Stuart; Sargusingh, Miriam J.

    2014-01-01

    The Cascade Distillation System (CDS) is a rotary distillation system with potential for greater reliability and lower energy costs than existing distillation systems. Based upon the results of the 2009 distillation comparison test (DCT) and recommendations of the expert panel, the Advanced Exploration Systems (AES) Water Recovery Project (WRP) project advanced the technology by increasing reliability of the system through redesign of bearing assemblies and improved rotor dynamics. In addition, the project improved the CDS power efficiency by optimizing the thermoelectric heat pump (TeHP) and heat exchanger design. Testing at the NASA-JSC Advanced Exploration System Water Laboratory (AES Water Lab) using a prototype Cascade Distillation Subsystem (CDS) wastewater processor (Honeywell d International, Torrance, Calif.) with test support equipment and control system developed by Johnson Space Center was performed to evaluate performance of the system with the upgrades as compared to previous system performance. The system was challenged with Solution 1 from the NASA Exploration Life Support (ELS) distillation comparison testing performed in 2009. Solution 1 consisted of a mixed stream containing human-generated urine and humidity condensate. A secondary objective of this testing is to evaluate the performance of the CDS as compared to the state of the art Distillation Assembly (DA) used in the ISS Urine Processor Assembly (UPA). This was done by challenging the system with ISS analog waste streams. This paper details the results of the AES WRP CDS performance testing.

  3. NEMO medium voltage converter factory acceptance, operational and final integration tests

    NASA Astrophysics Data System (ADS)

    Cocimano, Rosanna; NEMO Collaboration

    2011-01-01

    The NEMO Collaboration, as part of the KM3NeT EU-funded consortium, is developing technical solutions for the construction of a cubic-kilometer scale neutrino telescope in the Mediterranean sea several kilometers below the sea level and far from the shore. In this framework, after years of design, development, assembly and testing the Alcatel deep sea medium voltage power converter (MVC) is ready for deployment at 100 km from the Capo Passero shore station. The MVC converts the 10 kV to an instrument-friendly 375 V for a 10 kW power. The MVC will be presented with focus on the factory acceptance, operational and final integration tests that recently have been carried out.

  4. (Acceptance testing of the 150-kW electron-beam furnace)

    SciTech Connect

    Ohriner, E.K.; Howell, C.R.

    1990-09-18

    The travelers observed the acceptance testing of the 150-kW electron-beam (EB) furnace constructed by Leybold (Hanau) Technologies prior to disassembly and shipping. The testing included: (1) operation of the mold withdrawal system (2) vacuum pumping and vacuum chamber leak-up rates, (3) power stability at full power, (4) x-radiation monitoring at full power, and (5) demonstration of system interlocks for loss of water cooling, loss of vacuum, loss of power, and emergency shutdown. Preliminary training was obtained in furnace operation, EB gun maintenance, and use of the programmable logic controller for beam manipulation. Additional information was obtained on water-cooling requirements and furnace platform construction necessary for the installation. The information gained and training received will greatly assist in minimizing the installation and startup operation costs of the furnace.

  5. Ball Aerospace SBMD Coating Test Results

    NASA Technical Reports Server (NTRS)

    Brown, Robert; Lightsey, Paul; Russell, J. Kevin (Technical Monitor)

    2002-01-01

    The Sub-scale Beryllium Mirror Demonstrator that was successfully tested to demonstrate cryogenic figuring of a bare mirror has been coated with a protected gold reflective surface and retested at cryogenic temperatures. Results showing less than 9 nm rms surface distortion attributable to the added coating are presented.

  6. SLD liquid argon calorimeter prototype test results

    SciTech Connect

    Dubois, R.; Eigen, G.; Au, Y.; Sleeman, J.; Breidenbach, M.; Brau, J.; Ludgate, G.A.; Oram, C.J.; Cook, V.; Johnson, J.

    1985-10-01

    The results of the SLD test beam program for the selection of a calorimeter radiator composition within a liquid argon system are described, with emphasis on the study of the use of uranium to obtain equalization of pion and electron responses.

  7. High-Speed, High-Temperature Finger Seal Test Results

    NASA Technical Reports Server (NTRS)

    Proctor, Margaret P.; Kumar, Arun; Delgado, Irebert R.

    2002-01-01

    Finger seals have significantly lower leakage rates than conventional labyrinth seals used in gas turbine engines and are expected to decrease specific fuel consumption by over 1 percent and to decrease direct operating cost by over 0.5 percent. Their compliant design accommodates shaft growth and motion due to thermal and dynamic loads with minimal wear. The cost to fabricate these finger seals is estimated to be about half the cost to fabricate brush seals. A finger seal has been tested in NASA's High Temperature, High Speed Turbine Seal Test Rig at operating conditions up to 1200 F, 1200 ft/s, and 75 psid. Static, performance and endurance test results are presented. While seal leakage and wear performance are acceptable, further design improvements are needed to reduce the seal power loss.

  8. Evaluation and Acceptability of a Simplified Test of Visual Function at Birth in a Limited-Resource Setting

    PubMed Central

    Carrara, Verena I.; Darakomon, Mue Chae; Thin, Nant War War; Paw, Naw Ta Kaw; Wah, Naw; Wah, Hser Gay; Helen, Naw; Keereecharoen, Suporn; Paw, Naw Ta Mlar; Jittamala, Podjanee; Nosten, François H.; Ricci, Daniela; McGready, Rose

    2016-01-01

    Neurological examination, including visual fixation and tracking of a target, is routinely performed in the Shoklo Malaria Research Unit postnatal care units on the Thailand-Myanmar border. We aimed to evaluate a simple visual newborn test developed in Italy and performed by non-specialized personnel working in neonatal care units. An intensive training of local health staff in Thailand was conducted prior to performing assessments at 24, 48 and 72 hours of life in healthy, low-risk term singletons. The 48 and 72 hours results were then compared to values obtained to those from Italy. Parents and staff administering the test reported on acceptability. One hundred and seventy nine newborns, between June 2011 and October 2012, participated in the study. The test was rapidly completed if the infant remained in an optimal behavioral stage (7 ± 2 minutes) but the test duration increased significantly (12 ± 4 minutes, p < 0.001) if its behavior changed. Infants were able to fix a target and to discriminate a colored face at 24 hours of life. Horizontal tracking of a target was achieved by 96% (152/159) of the infants at 48 hours. Circular tracking, stripe discrimination and attention to distance significantly improved between each 24-hour test period. The test was easily performed by non-specialized local staff and well accepted by the parents. Healthy term singletons in this limited-resource setting have a visual response similar to that obtained to gestational age matched newborns in Italy. It is possible to use these results as a reference set of values for the visual assessment in Karen and Burmese infants in the first 72 hours of life. The utility of the 24 hours test should be pursued. PMID:27300137

  9. Comparing diagnostic tests: trials in people with discordant test results.

    PubMed

    Hooper, R; Díaz-Ordaz, K; Takeda, A; Khan, K

    2013-06-30

    Diagnostic tests are traditionally compared for accuracy against a gold standard but can also be compared prospectively in a trial. A conventional trial comparing two tests would randomize each participant to a testing strategy, but a more efficient alternative is to give both tests to all participants and follow up those with discordant results. Participants could be randomized before or after testing. The statistical analysis of such a trial has not previously been described. We investigated two estimates of the risk difference for a binary outcome: one based on analysing outcomes as if from a conventional trial and one combining estimates of different parameters in the manner of a decision analysis. We show that the trial estimate and decision analysis estimate are both unbiased and derive approximate formulae for their standard errors. By using the decision analysis estimate (but not the trial estimate), the same precision can be achieved by randomizing before testing as by randomizing after. To avoid destroying equipoise, and to allow consenting and randomizing to be carried out at the same visit, we recommend randomizing before testing. Giving both tests to all participants means fewer need to be recruited: in one example from the literature, the proposed design was nearly four times more efficient in this sense than a conventional trial design. PMID:23172716

  10. Results from the Astronomy Diagnostic Test National Project

    NASA Astrophysics Data System (ADS)

    Deming, G. L.

    2001-12-01

    During 2000 and 2001, the validity and reliability of the Astronomy Diagnostic Test Version 2.0 (ADT 2.0) were formally investigated through the Astronomy Diagnostic Test National Project. The ADT 2.0 was administered as a pre-test to 5346 students and as a post-test to 3842 students. Student test results were collected from 97 classes that ranged in size from 4 to 320 students with 30 states represented. The 68 professors participating in the ADT National Project taught classes at universities (54%), 4-year colleges (27%), and 2-year colleges (19%). The database was analyzed for reliability at the Ontario Institute for Studies in Education. A pre-test value for Cronbach's alpha of 0.65 and post-test value of 0.76 demonstrate an acceptable degree of internal consistency. The average score for the 44 participating professors who completed the ADT as experts was 98%. Face and content validity were established by combining results from the experts with feedback from 60 student interviews. Student results from the National Project yielded an average score of 32.4% for the pre-test and 47.3% for the post-test. There is a gender discrepancy in favor of males that persists in both the pre-test (11% points) and the post-test (12% points) scores. The variations across geographic distribution and institution types were not significant. In addition to the 21 content items, the ADT 2.0 has 12 student background questions enabling instructors to have a better understanding of who takes introductory astronomy. This research was supported by the National Science Foundation through grants REC-0089239 (GD) and DGE-9714489 (BH).

  11. Bell Pole CROW pilot test results and evaluation

    SciTech Connect

    Fahy, L.J.; Johnson, L.A. Jr. ); Sola, D.V.; Horn, S.G.; Christofferson, J.L. )

    1992-01-01

    Beginning in 1990, efforts were initiated to implement an in situ remediation project to address the creosote and pentachlorophenol (PCP) contaminated surficial aquifer at the Bell Lumber and Pole Company (Bell Pole) Site. The remediation project involves the application of the Contained Recovery of Oily Wastes (CROW[trademark]) process which consists of hot-water injection to displace and recover the non-aqueous phase liquids (NAPL). Based on the results from the pilot test the following conclusions can be made: (1) The pilot test provided sufficient hydraulic information to design the full-scale CROW remediation system. The pumping test portion of the pilot test indicated uniform aquifer properties. The entire thickness of the aquifer reached the target temperature range and containment of the injected hot water was achieved. (2) Pretest injection and production rate predictions were achieved. (3) The post test soil boring data indicated hot-water injection displaced greater than 80% of the NAPL near the injection well. The data indicates that a NAPL saturation of approximately 19% (pore volume basis) and a 500 fold decrease in PCP concentration can be achieved with 20 pore volumes of flushing. (4) The treatment system used during the pilot test was effective in reducing PCP and PAH compounds to concentrations acceptable for sanitary sewer discharge. (5) The microbial assay of the post test samples found an encouraging increase in microbial population compared to earlier data collected before the pilot test.

  12. Bell Pole CROW pilot test results and evaluation

    SciTech Connect

    Fahy, L.J.; Johnson, L.A. Jr.; Sola, D.V.; Horn, S.G.; Christofferson, J.L.

    1992-11-01

    Beginning in 1990, efforts were initiated to implement an in situ remediation project to address the creosote and pentachlorophenol (PCP) contaminated surficial aquifer at the Bell Lumber and Pole Company (Bell Pole) Site. The remediation project involves the application of the Contained Recovery of Oily Wastes (CROW{trademark}) process which consists of hot-water injection to displace and recover the non-aqueous phase liquids (NAPL). Based on the results from the pilot test the following conclusions can be made: (1) The pilot test provided sufficient hydraulic information to design the full-scale CROW remediation system. The pumping test portion of the pilot test indicated uniform aquifer properties. The entire thickness of the aquifer reached the target temperature range and containment of the injected hot water was achieved. (2) Pretest injection and production rate predictions were achieved. (3) The post test soil boring data indicated hot-water injection displaced greater than 80% of the NAPL near the injection well. The data indicates that a NAPL saturation of approximately 19% (pore volume basis) and a 500 fold decrease in PCP concentration can be achieved with 20 pore volumes of flushing. (4) The treatment system used during the pilot test was effective in reducing PCP and PAH compounds to concentrations acceptable for sanitary sewer discharge. (5) The microbial assay of the post test samples found an encouraging increase in microbial population compared to earlier data collected before the pilot test.

  13. MIT 12 Tesla Coil test results

    NASA Astrophysics Data System (ADS)

    Steeves, M. M.; Hoenig, M. O.

    1985-07-01

    Test results from the MIT 12 Tesla Coil experiment are presented. The coil was tested in the High Field Test Facility (HFTF) of the Lawrence Livermore National Laboratory in October 1984 and January 1985. The experiment measured the performance of an Internally Cooled, Cabled Superconductor (ICCS) of practical size, intended for use in magnetic fusion experiments. The MIT coil carried 15 kA at 11 T for 5 min with no sign of instability. A half turn length in a 10 T field was able to absorb a heat load in 4 msec of more than 200 mJ sub cm of cable volume while carrying a current of 12 kA. The MIT coil successfully met the performance requirements of the Department of Energy's 12 Tesla Coil Program.

  14. European Christians are at the forefront in accepting evolution: results from an internet-based survey.

    PubMed

    Wilson, David P

    2010-01-01

    Beliefs regarding the origins of the universe and life differ substantially between groups of people and are often particularly associated with religious worldviews. It is important to understand factors associated with evolution and creationism beliefs and unacceptance of scientific evidence for evolution. An internet-based survey was conducted to elicit information from people who self-identify as Christians, atheists, agnostics and other belief systems, as well as by geographical location and other demographic variables, on acceptance of evolution or creationism, certainty with which each position is believed, and reasons for rejecting the alternative. It was found that almost 60% of Christians believe in creationism and less than 10% believe in natural evolution. Worldwide, these proportions were relatively consistent across all locations except for in Europe. Among European Christians the majority of Christians believe in a form of evolution. It was found that the vast majority (87%) of Christians are 'absolutely certain' about their beliefs, compared with the minority of atheists and agnostics claiming 'absolute certainty'. Generally, reasons Christians did not accept evolution were based not on evidence but on religious doctrine. In contrast, the most common reason for not accepting the existence of a god by atheists who supported evolution was the lack of evidence. Innovative strategies may be required to communicate evolutionary science effectively to non-European Christians. PMID:21040420

  15. CLSM bleed water reduction test results

    SciTech Connect

    Langton, C.A.; Rajendran, N.

    1997-04-21

    Previous testing by BSRI/SRTC/Raytheon indicated that the CLSM specified for the Tank 20 closure generates about 6 gallons (23 liters) of bleed water per cubic yard of material (0.76 m3).1 This amount to about 10 percent of the total mixing water. HLWE requested that the CLSM mix be optimized to reduce bleed water while maintaining flow. Elimination of bleed water from the CLSM mix specified for High-Level Waste Tank Closure will result in waste minimization, time savings and cost savings. Over thirty mixes were formulated and evaluated at the on-site Raytheon Test Laboratory. Improved low bleed water CLSM mixes were identified. Results are documented in this report.

  16. 241-AZ-101 Mixer Pump Demonstration Test Gamma Cart Acceptance Test Procedure and Quality Test Plan (ATP and QTP)

    SciTech Connect

    WHITE, D.A.

    2000-03-01

    Shop Test of the Gamma Cart System to be used in the AZ-101 Mixer Pump Demonstration Test. Tests hardware and software. This procedure involves testing the Instrumentation involved with the Gamma Cart System, local and remote, including: depth indicators, speed controls, interface to data acquisition software and the raising and lowering functions. This Procedure will be performed twice, once for each Gamma Cart System. This procedure does not test the accuracy of the data acquisition software.

  17. Results from the final focus test beam

    SciTech Connect

    Burke, D.L.; Final Focus Test Beam Collaboration

    1994-07-01

    first experimental results from the Final Focus Test Beam (FFTB) are given in this report. The FFTB has been constructed as a prototype for the final focus system of a future TeV-scale electron-positron linear collider. The vertical dimension of the 47 GeV electron beam form the SLAC linac has been reduced at the focal point of the FFTB by a demagnification of 320 to a beam height of approximately 70 nanometers.

  18. Acceptance of Home-Based Chlamydia Genital and Anorectal Testing Using Short Message Service (SMS) in Previously Tested Young People and Their Social and Sexual Networks

    PubMed Central

    Wolffs, Petra T.; Kok, Gerjo; Hoebe, Christian J. P. A.

    2015-01-01

    Background Control strategies for Chlamydia trachomatis (CT) are most effective when targeting people at highest risk. We assessed test acceptance of home-collection test kits offered by short messaging services (SMS) texts, in high-risk young people, i.e. those who had previously tested CT positive (positive indices), or negative reporting more than 3 sex partners (negative indices), and their sexual and social networks. Methods Young (16 to 25 years old) heterosexuals who previously tested positive (n=536) or negative (n=536) in our STI clinic received, 3 to 20 months after their initial screening, an SMS inviting them to re-test. They were offered a free home-collection test kit including a genital (men and women) and anorectal (women only) test, and a test kit to pass on to a friend or sex partner (peer). SMS reminders were sent in case of non-response. We assessed proportions of tests requested and returned, peers tested, and positivity. Associations with the individual’s initial screening result and other factors were explored using logistic regression. Results Of 1072 people invited to retest, 34.4% (n=369) requested a test. Of these, 55.8% (n=206) retested. Overall, retest participation was higher in positive (22%) than in negative indices (16%) (p<0.001); it was also higher in women and in those aged >22 years. Positivity was 13% and 7% in positive and negative indices, respectively. One in 3 retesters also had a peer tested. Of tested peers (n=87), 84% were friends, 31% were first-time testers, and 7% tested positive. Conclusion Acceptance of a relatively low-cost strategy for genital and anorectal testing, i.e. using SMS and home-collection test kits, was highest in individuals who previously tested CT positive suggesting that implementation for this group may be considered. By further including a peer-led testing component, undetected CT positives can be identified in the social networks surrounding a high-risk individual. PMID:26230085

  19. Source test of the prototype neutron detector for the large-acceptance multipurpose spectrometer at RAON

    NASA Astrophysics Data System (ADS)

    Lee, Kisoo; Lee, Kyong Sei; Mulilo, Benard; Hong, Byungsik

    2013-05-01

    A neutron detector array will be essential for the study of the nuclear symmetry energy in the large-acceptance multipurpose spectrometer (LAMPS) at the planned rare-isotope beam facility RAON in Korea. We have built the prototype neutron detector for LAMPS and examined its performance by using radiation sources. For data taking, we tested the voltage-threshold discriminator (VTD) and the constant-fraction discriminator (CFD) modules for the pulse process. The intrinsic time resolution of the prototype detector is estimated to be 723 ps for VTD and 488 ps for CFD. The fission neutrons and gammas emitted from 252Cf can be clearly separated in the time distribution. We reconstruct the energy spectrum of the spontaneous fission neutrons from 252Cf, which can be described well by using the empirical Watt spectrum.

  20. Aquifer test results, Green Swamp area, Florida

    USGS Publications Warehouse

    Tibbals, C.H.; Grubb, Hayes F.

    1982-01-01

    An aquifer test conducted in the Green Swamp area December 15-16 , 1975 was designed to stress the uppermost part of the Floridan aquifer so that the leakage characteristics of the overlying confining bed could be determined. A well tapping the upper part of the Floridan aquifer was pumped at a rate of about 1,040 gallons per minute for 35 hours; drawdown was measured in the Floridan aquifer and in two horizons in the confining bed. Analysis of the data indicates that the transmissivity of the uppper 160 feet of the Floridan is 13,000 square feet per day, the storage coefficient is about 0.0002.5, and the overlying confining bed leakance coefficient is about 0.02 to 0.025 per day. The vertical hydraulic diffusivity of the confining bed ranged from 610 square feet per day to 16,000 square feet per day. Results of the test indicate that, in the area of the test site, a Floridan aquifer well field would induce additional recharge to the Floridan. As a result of that increased recharge , water levels in the surficial aquifer would tend to stand lower, runoff from the area would tend to be less, and, perhaps, evapotranspiration would be less than normal.(USGS)

  1. Flight qualification test results for violet cells

    NASA Technical Reports Server (NTRS)

    Gaddy, E. M.

    1974-01-01

    The violet solar cell has been submitted to a flight qualification program. The tasks included in this program were: to define the violet cell's electrical output from -100 C to +100 C; to determine the violet cell's degradation under 2 MeV, 1 MeV and .3 MeV proton irradiation, under a high humidity environment and under ultraviolet light; to thermal cycle two similar modules of violet cells; to flight qualify a full size violet cell panel for the IMP-J flight; and to obtain a primary balloon-flown standard of the violet cell type. The results of these tests demonstrate that the violet cell is fully qualified for space flight use with no further development work. The tests show that the violet cell offers a power increase of at least twenty-one per cent over presently available commercial cells.

  2. Highly Loaded Composite Strut Test Results

    NASA Technical Reports Server (NTRS)

    Wu, K. C.; Jegley, Dawn C.; Barnard, Ansley; Phelps, James E.; McKeney, Martin J.

    2011-01-01

    Highly loaded composite struts from a proposed truss-based Altair lunar lander descent stage concept were selected for development under NASA's Advanced Composites Technology program. Predicted compressive member forces during launch and ascent of over -100,000 lbs were much greater than the tensile loads. Therefore, compressive failure modes, including structural stability, were primary design considerations. NASA's industry partner designed and built highly loaded struts that were delivered to NASA for testing. Their design, fabricated on a washout mandrel, had a uniform-diameter composite tube with composite tapered ends. Each tapered end contained a titanium end fitting with facing conical ramps that are overlaid and overwrapped with composite materials. The highly loaded struts were loaded in both tension and compression, with ultimate failure produced in compression. Results for the two struts tested are presented and discussed, along with measured deflections, strains and observed failure mechanisms.

  3. Energy dissipation in Exosat tanks: Test results

    NASA Astrophysics Data System (ADS)

    Marce, J. L.; Torres, L.; Assemat, D.; Michel, S.

    1981-03-01

    Results of tests performed with inertia ratio and filling ratio scanning on Ariane tanks are presented. The Exosat launch requires the use of a fourth stage (P 0.7). The Exosat + P 0.7 assembly is spin stabilized with a spin rate of 50 rpm during transfer orbit. The unstable assembly is fitted with an active nutation damping system. To size this, it is necessary to know the time constant of nutation build up essentially due to fuel motion in the propane tanks and the hydrazine tank of Exosat. The major source of dissipation is the hydrazine tank for which an hysteresis phenomenon on diaphragm position was observed; the worst time constants of nutation build up, deduced from tests are 2.5 mn before P 0.7 and 1.9 mn after P 0.7 firing, taking into account the appropriate safety factors.

  4. GENIE Flight Test Results and System Overview

    NASA Technical Reports Server (NTRS)

    Brady, Tye; Paschall, Stephen, II; Crain, Timothy P., II; Demars, Kyle; Bishop, Robert

    2011-01-01

    NASA has envisioned a suite of lander test vehicles that will be flown in Earth s atmosphere to incrementally demonstrate applicable lunar lander performance in the terrestrial environment. As each terrestrial rocket progresses in maturity, relevant space flight technology matures to a higher technology readiness level, preparing it for inclusion on a future lunar lander design.. NASA s "Project M" lunar mission concept flew its first terrestrial rocket, RR1, in June 2010 in Caddo Mills, Texas. The Draper Laboratory built GENIE (Guidance Embedded Navigator Integration Environment) successfully demonstrated accurate, real time, embedded performance of Project M navigation and guidance algorithms in a highly dynamic environment. The RR1 vehicle, built by Armadillo Aerospace, performed a successful 60 second free flight and gave the team great confidence in Project M s highly reliable and robust GNC system design and implementation. This paper provides an overview of the GENIE system and describes recent flight performance test results onboard the RR1 terrestrial rocket.

  5. Results from the STAR TPC system test

    SciTech Connect

    Betts, W.; Bieser, F.; Bossingham, R.

    1996-12-31

    A system test of various components of the Solenoidal Tracker at RHIC (STAR) detector, operating in concern, has recently come on-line. Communication between a major sub-detector, a sector of the Time Projection Chamber (TPC), and the trigger, data acquisition and slow controls systems has been established, enabling data from cosmic ray muons to be collected. First results from an analysis of the TPC data are presented. These include measurements of system noise, electronic parameters such as amplifier gains and pedestal values, and tracking resolution for cosmic ray muons and laser induced ionization tracks. A discussion on the experience gained in integrating the different components for the system test is also given.

  6. PHASE I SINGLE CELL ELECTROLYZER TEST RESULTS

    SciTech Connect

    Steimke, J; Timothy Steeper, T

    2008-08-05

    This document reports the results of Phase I Single Cell testing of an SO{sub 2}-Depolarized Water Electrolyzer. Testing was performed primarily during the first quarter of FY 2008 at the Savannah River National Laboratory (SRNL) using an electrolyzer cell designed and built at SRNL. Other facility hardware were also designed and built at SRNL. This test further advances this technology for which work began at SRNL in 2005. This research is valuable in achieving the ultimate goal of an economical hydrogen production process based on the Hybrid Sulfur (HyS) Cycle. The focus of this work was to conduct single cell electrolyzer tests to further develop the technology of SO{sub 2}-depolarized electrolysis as part of the HyS Cycle. The HyS Cycle is a hybrid thermochemical cycle that may be used in conjunction with advanced nuclear reactors or centralized solar receivers to produce hydrogen by water-splitting. Like all other sulfur-based cycles, HyS utilizes the high temperature thermal decomposition of sulfuric acid to produce oxygen and regenerate sulfur dioxide. The unique aspect of HyS is the generation of hydrogen in a water electrolyzer that is operated under conditions where dissolved sulfur dioxide depolarizes the anodic reaction, resulting in substantial voltage reduction. Low cell voltage is essential for both thermodynamic efficiency and hydrogen cost. Sulfur dioxide is oxidized at the anode, producing sulfuric acid that is sent to the high temperature acid decomposition portion of the cycle. The electrolyzer cell uses the membrane electrode assembly (MEA) concept. The anode and cathode are formed by spraying platinum containing catalyst on both sides of a Proton Exchange Membrane (PEM). In most testing the material of the PEM was NafionR. The electrolyzer cell active area can be as large as 54.8 cm{sup 2}. Feed to the anode of the electrolyzer is a sulfuric acid solution containing sulfur dioxide. The partial pressure of sulfur dioxide could be varied in the

  7. Test Results From a High Power Linear Alternator Test Rig

    NASA Technical Reports Server (NTRS)

    Birchenough, Arthur G.; Hervol, David S.; Gardner, Brent G.

    2010-01-01

    Stirling cycle power conversion is an enabling technology that provides high thermodynamic efficiency but also presents unique challenges with regard to electrical power generation, management, and distribution. The High Power Linear Alternator Test Rig (HPLATR) located at the NASA Glenn Research Center (GRC) in Cleveland, Ohio is a demonstration test bed that simulates electrical power generation from a Stirling engine driven alternator. It implements the high power electronics necessary to provide a well regulated DC user load bus. These power electronics use a novel design solution that includes active rectification and power factor control, active ripple suppression, along with a unique building block approach that permits the use of high voltage or high current alternator designs. This report describes the HPLATR, the test program, and the operational results.

  8. Test Results from a High Power Linear Alternator Test Rig

    NASA Technical Reports Server (NTRS)

    Birchenough, Arthur G.; Hervol, David S.; Gardner, Brent G.

    2010-01-01

    Stirling cycle power conversion is an enabling technology that provides high thermodynamic efficiency but also presents unique challenges with regard to electrical power generation, management, and distribution. The High Power Linear Alternator Test Rig (HPLATR) located at the NASA Glenn Research Center (GRC) in Cleveland, OH is a demonstration test bed that simulates electrical power generation from a Stirling engine driven alternator. It implements the high power electronics necessary to provide a well regulated DC user load bus. These power electronics use a novel design solution that includes active rectification and power factor control, active ripple suppression, along with a unique building block approach that permits the use of high voltage or high current alternator designs. This presentation describes the HPLATR, the test program, and the operational results.

  9. Advanced Thermal Simulator Testing: Thermal Analysis and Test Results

    SciTech Connect

    Bragg-Sitton, Shannon M.; Dickens, Ricky; Dixon, David; Reid, Robert; Adams, Mike; Davis, Joe

    2008-01-21

    Work at the NASA Marshall Space Flight Center seeks to develop high fidelity, electrically heated thermal simulators that represent fuel elements in a nuclear reactor design to support non-nuclear testing applicable to the potential development of a space nuclear power or propulsion system. Comparison between the fuel pins and thermal simulators is made at the outer fuel clad surface, which corresponds to the outer sheath surface in the thermal simulator. The thermal simulators that are currently being tested correspond to a liquid metal cooled reactor design that could be applied for Lunar surface power. These simulators are designed to meet the geometric and power requirements of a proposed surface power reactor design, accommodate testing of various axial power profiles, and incorporate imbedded instrumentation. This paper reports the results of thermal simulator analysis and testing in a bare element configuration, which does not incorporate active heat removal, and testing in a water-cooled calorimeter designed to mimic the heat removal that would be experienced in a reactor core.

  10. Advanced Thermal Simulator Testing: Thermal Analysis and Test Results

    NASA Technical Reports Server (NTRS)

    Bragg-Sitton, Shannon M.; Dickens, Ricky; Dixon, David; Reid, Robert; Adams, Mike; Davis, Joe

    2008-01-01

    Work at the NASA Marshall Space Flight Center seeks to develop high fidelity, electrically heated thermal simulators that represent fuel elements in a nuclear reactor design to support non-nuclear testing applicable to the development of a space nuclear power or propulsion system. Comparison between the fuel pins and thermal simulators is made at the outer fuel clad surface, which corresponds to the outer sheath surface in the thermal simulator. The thermal simulators that are currently being tested correspond to a SNAP derivative reactor design that could be applied for Lunar surface power. These simulators are designed to meet the geometric and power requirements of a proposed surface power reactor design, accommodate testing of various axial power profiles, and incorporate imbedded instrumentation. This paper reports the results of thermal simulator analysis and testing in a bare element configuration, which does not incorporate active heat removal, and testing in a water-cooled calorimeter designed to mimic the heat removal that would be experienced in a reactor core.

  11. Arc melter demonstration baseline test results

    SciTech Connect

    Soelberg, N.R.; Chambers, A.G.; Anderson, G.L.; Oden, L.L.; O`Connor, W.K.; Turner, P.C.

    1994-07-01

    This report describes the test results and evaluation for the Phase 1 (baseline) arc melter vitrification test series conducted for the Buried Waste Integrated Demonstration program (BWID). Phase 1 tests were conducted on surrogate mixtures of as-incinerated wastes and soil. Some buried wastes, soils, and stored wastes at the INEL and other DOE sites, are contaminated with transuranic (TRU) radionuclides and hazardous organics and metals. The high temperature environment in an electric arc furnace may be used to process these wastes to produce materials suitable for final disposal. An electric arc furnace system can treat heterogeneous wastes and contaminated soils by (a) dissolving and retaining TRU elements and selected toxic metals as oxides in the slag phase, (b) destroying organic materials by dissociation, pyrolyzation, and combustion, and (c) capturing separated volatilized metals in the offgas system for further treatment. Structural metals in the waste may be melted and tapped separately for recycle or disposal, or these metals may be oxidized and dissolved into the slag. The molten slag, after cooling, will provide a glass/ceramic final waste form that is homogeneous, highly nonleachable, and extremely durable. These features make this waste form suitable for immobilization of TRU radionuclides and toxic metals for geologic timeframes. Further, the volume of contaminated wastes and soils will be substantially reduced in the process.

  12. Preliminary test results for the SVX4

    SciTech Connect

    Christofek, L.; Hanagaki, K.; Rapidis, P.; Utes, M.; /Fermilab

    2005-06-01

    We present and summarize the preliminary test results for SVX4 chip testing. There are presently two versions of the SVX4. Version 2 has on-chip bypassing and Version 1 does not. The on-chip bypassing is a layer of transistors under the front-end analog pipeline that acts as a bypassing capacitor for the voltage supply. Its size is about a microfarad. We aggressively choose to test Version 2 because of this feature. The feature is advantageous for hybrid design because it eliminates the need for an additional passive component on the hybrid itself by placing it on the actual SVX4 die. Also, the SVX4 was designed to operate in two modes: D. and CDF. One can set which mode the chip will operate by placing a jumper in the proper position on the SVX4 chip carrier. In either mode, the chip can either use the operating parameters from the shift register or the shadow register. Similarly, this is selected by placing a jumper on the SVX4 chip carrier. This chip has this feature because it was unknown whether the new design of the shadow register would be operable. The shadow register is also call the SEU register or Single Event Upset register. An introduction into the functionality of the chip and an explanation on the difference between D. and CDF mode can be found in the SVX4 User's Manual [1].

  13. HIV Surveillance in a Large, Community-Based Study: Results from the Pilot Study of Project Accept (HIV Prevention Trials Network 043)

    PubMed Central

    2011-01-01

    Background Project Accept is a community randomized, controlled trial to evaluate the efficacy of community mobilization, mobile testing, same-day results, and post-test support for the prevention of HIV infection in Thailand, Tanzania, Zimbabwe, and South Africa. We evaluated the accuracy of in-country HIV rapid testing and determined HIV prevalence in the Project Accept pilot study. Methods Two HIV rapid tests were performed in parallel in local laboratories. If the first two rapid tests were discordant (one reactive, one non-reactive), a third HIV rapid test or enzyme immunoassay was performed. Samples were designated HIV NEG if the first two tests were non-reactive, HIV DISC if the first two tests were discordant, and HIV POS if the first two tests were reactive. Samples were re-analyzed in the United States using a panel of laboratory tests. Results HIV infection status was correctly determined based on-in country testing for 2,236 (99.5%) of 2,247 participants [7 (0.37%) of 1,907 HIV NEG samples were HIV-positive; 2 (0.63%) of 317 HIV POS samples were HIV-negative; 2 (8.3%) of 24 HIV DISC samples were incorrectly identified as HIV-positive based on the in-country tie-breaker test]. HIV prevalence was: Thailand: 0.6%, Tanzania: 5.0%, Zimbabwe 14.7%, Soweto South Africa: 19.4%, Vulindlela, South Africa: 24.4%, (overall prevalence: 14.4%). Conclusions In-country testing based on two HIV rapid tests correctly identified the HIV infection status for 99.5% of study participants; most participants with discordant HIV rapid tests were not infected. HIV prevalence varied considerably across the study sites (range: 0.6% to 24.4%). Trial Registration ClinicalTrials.gov registry number NCT00203749. PMID:21943026

  14. Physics Characterization of TLD-600 and TLD-700 and Acceptance Testing of New XRAD 160 Biological X-Ray Irradiator

    NASA Astrophysics Data System (ADS)

    Cao, Yanan

    2: Acceptance testing of new X-RAD 160 Biological X-Ray Irradiator. Purpose: An X-RAD 160 Biological X-Ray Irradiator was recently installed at Duke University to serve as a key device for cellular radiobiology research. The purpose of this study is to perform acceptance testing on the new irradiator for operator radiation safety and irradiation specifications. Methods: The acceptance testing included tests of the following components: (1) Leakage radiation survey, (2) Half-value layer (beam quality), (3) Uniformity, (4) KVp accuracy, (5) Exposure at varying mA (linearity of mA), (6) Exposure at varying kVp, (7) Inverse square measurements, (8) Field size measurement, (9) Exposure constancy. The irradiation parameters for each components of first round of acceptance testing performed on September 21, 2012 were: Leakage radiation survey (none, 160 kVp, 18 mA, 200s), Beam quality (40cm, 50-140 kVp in 10 kVp incensement, 1 mA, 10s, none), Uniformity (40cm, 160 kVp, 18 mA, 15s, F1), KVp accuracy (40cm, 50-150 kVp in 10 kVp incensement, 10 mA, 15s, none), Linearity of mA (40cm, 160 kVp, 2-18 mA, 15s, none), Inverse square measurements (20-63cm, 160 kVp, 1mA, 30s, none), Field size measurement (40cm, 160 kVp, 10 mA, 15s, none), Exposure constancy (40cm, 160 kVp, 18 mA, 20s, none). The irradiation parameters for each components for each components of second round of acceptance testing performed on November 18, 2012 were: Beam quality (40cm, 35-150 kVp, 1 mA, 10s, F1), KVp accuracy (40cm, 35-150 kVp, 1 mA, 10s, F1), Variation of kVp (40cm, 160 kVp, 18 mA, 30s, F1), Linearity of mA (40cm, 160 kVp, 1-18 mA, 30s, F1), Uniformity (40cm, 160 kVp, 18 mA, 30s, F1), Inverse square measurements (20-63cm, 160 kVp, 18 mA, 30s, F1). Results: The first round of acceptance testing performed on September 21, 2012 failed due to the fact that the measured exposure along the X-axis was significantly non-uniform; the exposure greatly decreases going in the left direction, which is a clear

  15. Suicide acceptability among U.S. Veterans with active duty experience: results from the 2010 General Social Survey.

    PubMed

    Blosnich, John; Bossarte, Robert

    2013-01-01

    The objective of this study was to examine whether U.S. Veterans more frequently indicate suicide acceptability than non-Veterans. The 2010 General Social Survey, which employed a probability-based sample of U.S. adults, was analyzed by self-reported Veteran status on suicide acceptability in four, separate hypothetical situations regarding ending one's life (i.e., incurable illness, bankruptcy, bringing dishonor/shame upon family, tired of living and ready to die). Veterans were no more likely to endorse suicide as acceptable than their non-Veteran counterparts. Results suggest that attitudes approving of suicide are not different among Veterans in general and non-Veterans. However, future research may need to examine whether subpopulations of Veterans with elevated risk for suicide may report differential attitudes about suicide. PMID:23387403

  16. Wireless Fetal Heart Rate Monitoring in Inpatient Full-Term Pregnant Women: Testing Functionality and Acceptability

    PubMed Central

    Boatin, Adeline A.; Wylie, Blair; Goldfarb, Ilona; Azevedo, Robin; Pittel, Elena; Ng, Courtney; Haberer, Jessica

    2015-01-01

    We tested functionality and acceptability of a wireless fetal monitoring prototype technology in pregnant women in an inpatient labor unit in the United States. Women with full-term singleton pregnancies and no evidence of active labor were asked to wear the prototype technology for 30 minutes. We assessed functionality by evaluating the ability to successfully monitor the fetal heartbeat for 30 minutes, transmit this data to Cloud storage and view the data on a web portal. Three obstetricians also rated fetal cardiotocographs on ease of readability. We assessed acceptability by administering closed and open-ended questions on perceived utility and likeability to pregnant women and clinicians interacting with the prototype technology. Thirty-two women were enrolled, 28 of whom (87.5%) successfully completed 30 minutes of fetal monitoring including transmission of cardiotocographs to the web portal. Four sessions though completed, were not successfully uploaded to the Cloud storage. Six non-study clinicians interacted with the prototype technology. The primary technical problem observed was a delay in data transmission between the prototype and the web portal, which ranged from 2 to 209 minutes. Delays were ascribed to Wi-Fi connectivity problems. Recorded cardiotocographs received a mean score of 4.2/5 (± 1.0) on ease of readability with an interclass correlation of 0.81(95%CI 0.45, 0.96). Both pregnant women and clinicians found the prototype technology likable (81.3% and 66.7% respectively), useful (96.9% and 66.7% respectively), and would either use it again or recommend its use to another pregnant woman (77.4% and 66.7% respectively). In this pilot study we found that this wireless fetal monitoring prototype technology has potential for use in a United States inpatient setting but would benefit from some technology changes. We found it to be acceptable to both pregnant women and clinicians. Further research is needed to assess feasibility of using this

  17. Wireless fetal heart rate monitoring in inpatient full-term pregnant women: testing functionality and acceptability.

    PubMed

    Boatin, Adeline A; Wylie, Blair; Goldfarb, Ilona; Azevedo, Robin; Pittel, Elena; Ng, Courtney; Haberer, Jessica

    2015-01-01

    We tested functionality and acceptability of a wireless fetal monitoring prototype technology in pregnant women in an inpatient labor unit in the United States. Women with full-term singleton pregnancies and no evidence of active labor were asked to wear the prototype technology for 30 minutes. We assessed functionality by evaluating the ability to successfully monitor the fetal heartbeat for 30 minutes, transmit this data to Cloud storage and view the data on a web portal. Three obstetricians also rated fetal cardiotocographs on ease of readability. We assessed acceptability by administering closed and open-ended questions on perceived utility and likeability to pregnant women and clinicians interacting with the prototype technology. Thirty-two women were enrolled, 28 of whom (87.5%) successfully completed 30 minutes of fetal monitoring including transmission of cardiotocographs to the web portal. Four sessions though completed, were not successfully uploaded to the Cloud storage. Six non-study clinicians interacted with the prototype technology. The primary technical problem observed was a delay in data transmission between the prototype and the web portal, which ranged from 2 to 209 minutes. Delays were ascribed to Wi-Fi connectivity problems. Recorded cardiotocographs received a mean score of 4.2/5 (± 1.0) on ease of readability with an interclass correlation of 0.81(95%CI 0.45, 0.96). Both pregnant women and clinicians found the prototype technology likable (81.3% and 66.7% respectively), useful (96.9% and 66.7% respectively), and would either use it again or recommend its use to another pregnant woman (77.4% and 66.7% respectively). In this pilot study we found that this wireless fetal monitoring prototype technology has potential for use in a United States inpatient setting but would benefit from some technology changes. We found it to be acceptable to both pregnant women and clinicians. Further research is needed to assess feasibility of using this

  18. An Examination of Three Texas High Schools' Restructuring Strategies that Resulted in an Academically Acceptable Rating

    ERIC Educational Resources Information Center

    Massey Fields, Chamara

    2011-01-01

    This study examined three high schools in a large urban school district in Texas that achieved an academically acceptable rating after being sanctioned to reconstitute by state agencies. Texas state accountability standards are a result of the No Child Left Behind Act of 2011 (NCLB). Texas state law requires schools to design a reconstitution plan…

  19. Safety and Acceptability of Couples HIV Testing and Counseling for US Men Who Have Sex with Men: A Randomized Prevention Study

    PubMed Central

    Sullivan, Patrick S.; White, Darcy; Rosenberg, Eli S.; Barnes, Jasper; Jones, Jeb; Dasgupta, Sharoda; O’Hara, Brandon; Scales, Lamont; Salazar, Laura F.; Wingood, Gina; DiClemente, Ralph; Wall, Kristin M.; Hoff, Colleen; Gratzer, Beau; Allen, Susan; Stephenson, Rob

    2013-01-01

    We tested a couples HIV testing and counseling (CHTC) intervention with male couples in Atlanta by randomizing eligible couples to receive either CHTC or separate individual voluntary HIV counseling and testing (iVCT). To evaluate the acceptability and safety of CHTC, main outcomes were satisfaction with the intervention and the proportions of couples reporting intimate partner violence (IPV) and relationship dissolution after the service. The results indicated that the service was very acceptable to men (median 7-item index of satisfaction was 34 for CHTC and 35 for iVCT, P = .4). There was no difference in either incident IPV (22% versus 17% for CHTC and iVCT, respectively, P = .6) or relationship dissolution (42% versus 51% for CHTC and iVCT, respectively, P = .5). Based on the preliminary data, CHTC is safe for male couples, and it is equally acceptable to iVCT for men who have main partners. PMID:23995295

  20. Project W-314 acceptance test report HNF-4651 for HNF-4650 SN-268 encasement leak detection ANA-WT-LDSTA-335 for project W-314

    SciTech Connect

    HAMMERS, J.S.

    1999-09-30

    The purpose of the test was to verify that the AN Tank Farm Encasement Leak Detector components are functionally integrated and operate in accordance with engineering design specifications The Acceptance Test Procedure HNF-4650, SN-268 Encasement Leak Detection ANA-W-LDSTA-335, was conducted between 22 June and 01 July 1999 at the 200E AN Tank Farm. The test has been completed with no open test exceptions The test was conducted prior to final engineering ''as built'' activities being completed this had no impact on the procedure or test results. All components, identified in the procedure, were found to be labeled and identified as written in the procedure.

  1. The NASA B-757 HIRF Test Series: Flight Test Results

    NASA Technical Reports Server (NTRS)

    Moeller, Karl J.; Dudley, Kenneth L.

    1997-01-01

    In 1995, the NASA Langley Research Center conducted a series of aircraft tests aimed at characterizing the electromagnetic environment (EME) in and around a Boeing 757 airliner. Measurements were made of the electromagnetic energy coupled into the aircraft and the signals induced on select structures as the aircraft was flown past known RF transmitters. These measurements were conducted to provide data for the validation of computational techniques for the assessment of electromagnetic effects in commercial transport aircraft. This paper reports on the results of flight tests using RF radiators in the HF, VHF, and UHF ranges and on efforts to use computational and analytical techniques to predict RF field levels inside the airliner at these frequencies.

  2. Results from the Cooler and Lead Tests

    SciTech Connect

    Green, Michael A

    2010-06-10

    The report presents the results of testing MICE spectrometer magnet current leads on a test apparatus that combines both the copper leads and the high temperature superconducting (HTS) leads with a single Cryomech PT415 cooler and liquid helium tank. The current is carried through the copper leads from 300 K to the top of the HTS leads. The current is then carried through the HTS leads to a feed-through from the vacuum space to the inside of a liquid helium tank. The experiment allows one to measure the performance of both cooler stages along with the performance of the leads. While the leads were powered we measured the voltage drops through the copper leads, through the HTS leads, through spliced to the feed-through, through the feed-through and through the low-temperature superconducting loop that connects one lead to the other. Measurements were made using the leads that were used in spectrometer magnet 1A and spectrometer magnet 2A. These are the same leads that were used for Superbend and Venus magnets at LBNL. The IL/A for these leads was 5.2 x 10{sup 6} m{sup -1}. The leads turned out to be too long. The same measurements were made using the leads that were installed in magnet 2B. The magnet 2B leads had an IL/A of 3.3 x 10{sup 6} A m{sup -1}. This report discusses the cooler performance and the measured electrical performance of the lead circuit that contains the copper leads and the superconducting leads. All of the HTS leads that were installed in magnet 2B were current tested using this apparatus.

  3. Advanced wing design survivability testing and results

    NASA Technical Reports Server (NTRS)

    Bruno, J.; Tobias, M.

    1992-01-01

    Composite wings on current operational aircraft are conservatively designed to account for stress/strain concentrations, and to assure specified damage tolerance. The technology that can lead to improved composite wing structures and associated structural efficiency is to increase design ultimate strain levels beyond their current limit of 3500 to 4000 micro-in/in to 6000 micro-in/in without sacrificing structural integrity, durability, damage tolerance, or survivability. Grumman, under the sponsorship of the Naval Air Development Center (NADC), has developed a high-strain composite wing design for a subsonic aircraft wing using novel and innovative design concepts and manufacturing methods, while maintaining a state-of-the-art fiber/resin system. The current advanced wing design effort addressed a tactical subsonic aircraft wing using previously developed, high-strain wing design concepts in conjunction with newer/emerging fiber and polymer matrix composite (PMC) materials to achieve the same goals, while reducing complexity. Two categories of advanced PMC materials were evaluated: toughened thermosets; and engineered thermoplastics. Advanced PMC materials offer the technological opportunity to take maximum advantage of improved material properties, physical characteristics, and tailorability to increase performance and survivability over current composite structure. Damage tolerance and survivability to various threats, in addition to structural integrity and durability, were key technical issues addressed during this study, and evaluated through test. This paper focuses on the live-fire testing, and the results performed to experimentally evaluate the survivability of the advanced wing design.

  4. Smart wing wind tunnel test results

    NASA Astrophysics Data System (ADS)

    Scherer, Lewis B.; Martin, Christopher A.; Appa, Kari; Kudva, Jayanth N.; West, Mark N.

    1997-05-01

    The use of smart materials technologies can provide unique capabilities in improving aircraft aerodynamic performance. Northrop Grumman built and tested a 16% scale semi-span wind tunnel model of the F/A-18 E/F for the on-going DARPA/WL Smart Materials and Structures-Smart Wing Program. Aerodynamic performance gains to be validated included increase in the lift to drag ratio, increased pitching moment (Cm), increased rolling moment (Cl) and improved pressure distribution. These performance gains were obtained using hingeless, contoured trailing edge control surfaces with embedded shape memory alloy (SMA) wires and spanwise wing twist via a SMA torque tube and are compared to a conventional wind tunnel model with hinged control surfaces. This paper presents an overview of the results from the first wind tunnel test performed at the NASA Langley's 16 ft Transonic Dynamic Tunnel. Among the benefits demonstrated are 8 - 12% increase in rolling moment due to wing twist, a 10 - 15% increase in rolling moment due to contoured aileron, and approximately 8% increase in lift due to contoured flap, and improved pressure distribution due to trailing edge control surface contouring.

  5. Boeing's High Voltage Solar Tile Test Results

    NASA Technical Reports Server (NTRS)

    Reed, Brian J.; Harden, David E.; Ferguson, Dale C.; Snyder, David B.

    2002-01-01

    Real concerns of spacecraft charging and experience with solar array augmented electrostatic discharge arcs on spacecraft have minimized the use of high voltages on large solar arrays despite numerous vehicle system mass and efficiency advantages. Boeing's solar tile (patent pending) allows high voltage to be generated at the array without the mass and efficiency losses of electronic conversion. Direct drive electric propulsion and higher power payloads (lower spacecraft weight) will benefit from this design. As future power demand grows, spacecraft designers must use higher voltage to minimize transmission loss and power cable mass for very large area arrays. This paper will describe the design and discuss the successful test of Boeing's 500-Volt Solar Tile in NASA Glenn's Tenney chamber in the Space Plasma Interaction Facility. The work was sponsored by NASA's Space Solar Power Exploratory Research and Technology (SERT) Program and will result in updated high voltage solar array design guidelines being published.

  6. Lunar Water Resource Demonstration (LWRD) Test Results

    NASA Technical Reports Server (NTRS)

    Muscatello, Anthony C.; Captain, Janine E.; Quinn, Jacqueline W.; Gibson, Tracy L.; Perusich, Stephen A.; Weis, Kyle H.

    2009-01-01

    NASA has undertaken the In-Situ Resource Utilization (lSRU) project called RESOLVE (Regolith and Environment Science & Oxygen and Lunar Volatile Extraction). This project is an Earth-based lunar precursor demonstration of a system that could be sent to explore permanently shadowed polar lunar craters, where it would drill into regolith, quantify the volatiles that are present, and extract oxygen by hydrogen reduction of iron oxides. The RESOLVE chemical processing system was mounted within the CMU rover "Scarab" and successfully demonstrated on Hawaii's Mauna Kea volcano in November 2008. This technology could be used on Mars as well. As described at the 2008 Mars Society Convention, the Lunar Water Resource Demonstration (LWRD) supports the objectives of the RESOLVE project by capturing and quantifying water and hydrogen released by regolith upon heating. Field test results for the quantification of water using LWRD showed that the volcanic ash (tephra) samples contained 0.15-0.41% water, in agreement with GC water measurements. Reduction of the RH in the surge tank to near zero during recirculation show that the water is captured by the water beds as desired. The water can be recovered by heating the Water Beds to 230 C or higher. Test results for the capture and quantification of pure hydrogen have shown that over 90% of the hydrogen can be captured and 98% of the absorbed hydrogen can be recovered upon heating the hydride to 400 C and desorbing the hydrogen several times into the evacuated surge tank. Thus, the essential requirement of capturing hydrogen and recovering it has been demonstrated. ,

  7. Human Factors Process Task Analysis Liquid Oxygen Pump Acceptance Test Procedure for the Advanced Technology Development Center

    NASA Technical Reports Server (NTRS)

    Diorio, Kimberly A.

    2002-01-01

    A process task analysis effort was undertaken by Dynacs Inc. commencing in June 2002 under contract from NASA YA-D6. Funding was provided through NASA's Ames Research Center (ARC), Code M/HQ, and Industrial Engineering and Safety (IES). The John F. Kennedy Space Center (KSC) Engineering Development Contract (EDC) Task Order was 5SMA768. The scope of the effort was to conduct a Human Factors Process Failure Modes and Effects Analysis (HF PFMEA) of a hazardous activity and provide recommendations to eliminate or reduce the effects of errors caused by human factors. The Liquid Oxygen (LOX) Pump Acceptance Test Procedure (ATP) was selected for this analysis. The HF PFMEA table (see appendix A) provides an analysis of six major categories evaluated for this study. These categories include Personnel Certification, Test Procedure Format, Test Procedure Safety Controls, Test Article Data, Instrumentation, and Voice Communication. For each specific requirement listed in appendix A, the following topics were addressed: Requirement, Potential Human Error, Performance-Shaping Factors, Potential Effects of the Error, Barriers and Controls, Risk Priority Numbers, and Recommended Actions. This report summarizes findings and gives recommendations as determined by the data contained in appendix A. It also includes a discussion of technology barriers and challenges to performing task analyses, as well as lessons learned. The HF PFMEA table in appendix A recommends the use of accepted and required safety criteria in order to reduce the risk of human error. The items with the highest risk priority numbers should receive the greatest amount of consideration. Implementation of the recommendations will result in a safer operation for all personnel.

  8. Field Lysimeter Test Facility: Second year (FY 1989) test results

    SciTech Connect

    Campbell, M.D.; Gee, G.W.; Kanyid, M.J.; Rockhold, M.L.

    1990-04-01

    The Record of Decision associated with the Hanford Defense Waste Environmental Impact Statement (53 FR 12449-53) commits to an evaluation of the use of protective barriers placed over near-surface wastes. The barrier must protect against wind and water erosion and limit plant and animal intrusion and infiltration of water. Successful conclusion of this program will yield the necessary protective barrier design for near-surface waste isolation. This report presents results from the second year of tests at the FLTF. The primary objective of testing protective barriers at the FLTF was to measure the water budgets within the various barriers and assess the effectiveness of their designs in limiting water intrusion into the zone beneath each barrier. Information obtained from these measurements is intended for use in refining barrier designs. Four elements of water budget were measured during the year: precipitation, evaporation, storage, and drainage. Run-off, which is a fifth element of a complete water budget, was made negligible by a lip on the lysimeters that protrudes 5 cm above the soil surface to prevent run-off. A secondary objective of testing protective barriers at the FLTF was to refine procedures and equipment to support data collection for verification of the computer model needed for long-term projections of barrier performance. 6 refs.

  9. A prototype tap test imaging system: Initial field test results

    NASA Astrophysics Data System (ADS)

    Peters, J. J.; Barnard, D. J.; Hudelson, N. A.; Simpson, T. S.; Hsu, D. K.

    2000-05-01

    This paper describes a simple, field-worthy tap test imaging system that gives quantitative information about the size, shape, and severity of defects and damages. The system consists of an accelerometer, electronic circuits for conditioning the signal and measuring the impact duration, a laptop PC and data acquisition and processing software. The images are generated manually by tapping on a grid printed on a plastic sheet laid over the part's surface. A mechanized scanner is currently under development. The prototype has produced images for a variety of aircraft composite and metal honeycomb structures containing flaws, damages, and repairs. Images of the local contact stiffness, deduced from the impact duration using a spring model, revealed quantitatively the stiffness reduction due to flaws and damages, as well as the stiffness enhancement due to substructures. The system has been field tested on commercial and military aircraft as well as rotor blades and engine decks on helicopters. Field test results will be shown and the operation of the system will be demonstrated.—This material is based upon work supported by the Federal Aviation Administration under Contract #DTFA03-98-D-00008, Delivery Order No. IA016 and performed at Iowa State University's Center for NDE as part of the Center for Aviation Systems Reliability program.

  10. A review of acceptance testing of the Los Alamos/Canberra Alpha Sentry Continuous Air Monitor (CAM)

    SciTech Connect

    Rodgers, J.C.

    1998-09-01

    Los Alamos National Laboratory (LANL) undertook the design and development of a new generation of alpha continuous air monitor (CAM) instrumentation that would incorporate advanced technologies in the design of the sampling inlet, multi-channel analyzer (MCA) electronics, solid state alpha detectors, radon background interference suppression, background interference compensation and based on spectral analysis, and microcomputer based data communication, processing, storage, and retrieval. The ANSI air monitoring instrument standards (Performance Specifications for Health Physics Instrumentation -- Occupational Airborne Radioactivity Monitoring Instrumentation, N42.17B) specify performance criteria and testing procedures for instruments and instrument systems designed to continuously sample and quantify airborne radioactivity in the workplace. Although the intent of the standard is to provide performance testing criteria for type testing, it is appropriate to evaluate the performance of a new instrument such as the Alpha Sentry against certain of these criteria for purposes of an acceptance test based on stated specifications and the Los Alamos CAM Requirements document. This report provides an overview of the results of these tests, as they pertain to instruments designed to detect alpha-emitting radionuclides in particulate form.

  11. Awareness of HIV/AIDS prevention and acceptance of HIV testing among residents in Likoma Island, northern Malawi.

    PubMed

    Chiang, Hung Che; Yu, Kwong Leung; Yap, Shue Fang; Goh, Kah Kheng; Mo, Meng Hsuan; Yang, Ta Wei; Ngo, Yeh Giin; Hsu, Shu Jung; Wu, Yi Ching; Lai, Chung Sheng; Ko, Ying Chin; Chang, Po Ya

    2009-09-01

    To evaluate the awareness of HIV/AIDS prevention education, and the acceptance of HIV testing among residents on Likoma Island, Malawi, a cross-sectional, population-based study of 579 residents aged > or =15 years from seven villages on Likoma Island was conducted during July and August 2007. Most of the subjects studied could correctly answer questions about their awareness of AIDS and knowledge of the ways to reduce HIV transmission. Moreover, the proportion of respondents (65.8%) who possessed complete knowledge of HIV/AIDS prevention was greater than the national average. By contrast, condom utilization was slightly lower. Our results also showed that a high proportion of respondents (70.3%) had been HIV tested at any time, 93.5% of them voluntarily. Among correlated factors, females [adjusted odds ratio (AOR)=1.7, 95% CI 1.1-1.6] and polygamous individuals (AOR=3.3, 95% CI 1.5-7.0) were more likely to receive an HIV test. Past experience of being HIV tested was a strong predictor of possessing good knowledge and attitudes towards HIV/AIDS prevention. We conclude that antiretroviral treatment provided by Likoma District Hospital has led to the successful scale-up of HIV testing in Likoma Island and consequently improved the awareness of HIV/AIDS. However, the use of condoms remains largely unsupported, and there is therefore still a need to intensify general HIV/AIDS education on the island. PMID:19628236

  12. Delinquency and Peer Acceptance in Adolescence: A Within-Person Test of Moffitt's Hypotheses

    ERIC Educational Resources Information Center

    Rulison, Kelly L.; Kreager, Derek A.; Osgood, D. Wayne

    2014-01-01

    We tested 2 hypotheses derived from Moffitt's (1993) taxonomic theory of antisocial behavior, both of which are central to her explanation for the rise in delinquency during adolescence. We tested whether persistently delinquent individuals become more accepted by their peers during adolescence and whether individuals who abstain from…

  13. Testing the Electronic Personal Health Record Acceptance Model by Nurses for Managing Their Own Health

    PubMed Central

    Trinkoff, A.M.; Storr, C.L.; Wilson, M.L.; Gurses, A.P.

    2015-01-01

    Summary Background To our knowledge, no evidence is available on health care professionals’ use of electronic personal health records (ePHRs) for their health management. We therefore focused on nurses’ personal use of ePHRs using a modified technology acceptance model. Objectives To examine (1) the psychometric properties of the ePHR acceptance model, (2) the associations of perceived usefulness, ease of use, data privacy and security protection, and perception of self as health-promoting role models to nurses’ own ePHR use, and (3) the moderating influences of age, chronic illness and medication use, and providers’ use of electronic health record (EHRs) on the associations between the ePHR acceptance constructs and ePHR use. Methods A convenience sample of registered nurses, those working in one of 12 hospitals in the Maryland and Washington, DC areas and members of the nursing informatics community (AMIA and HIMSS), were invited to respond to an anonymous online survey; 847 responded. Multiple logistic regression identified associations between the model constructs and ePHR use, and the moderating effect. Results Overall, ePHRs were used by 47%. Sufficient reliability for all scales was found. Three constructs were significantly related to nurses’ own ePHR use after adjusting for covariates: usefulness, data privacy and security protection, and health-promoting role model. Nurses with providers that used EHRs who perceived a higher level of data privacy and security protection had greater odds of ePHR use than those whose providers did not use EHRs. Older nurses with a higher self-perception as health-promoting role models had greater odds of ePHR use than younger nurses. Conclusions Nurses who use ePHRs for their personal health might promote adoption by the general public by serving as health-promoting role models. They can contribute to improvements in patient education and ePHR design, and serve as crucial resources when working with their

  14. Value Acceptance on Adolescent Socialization: A Test of a Cognitive-Functional Theory of Television Effects.

    ERIC Educational Resources Information Center

    Tan, Alexis; Nelson, Leigh; Dong, Qingwen; Tan, Gerdean

    1997-01-01

    Presents a cognitive-functional explanation of television's influence on Anglo-American, Native American, and Hispanic adolescents' acceptance of values. Finds that adolescents accepted values observed in television when they recognized them (a measure of learning) and when they evaluated the values to be important in "being successful" in the…

  15. Evaluation of three soil toxicity tests used to monitor acceptable endpoints

    SciTech Connect

    Brinkmann, M.; Stroo, H.; Leuschner, A.; Leuteritz, D.; Stromberg, M.; Brourman, M.

    1995-12-31

    Three terrestrial toxicity tests were used to evaluate the efficacy of biological treatment of creosote and pentachlorophenol impacted soils at a Superfund site. Microtox, 5-day lettuce seed, and 14-day earthworm toxicity tests were performed on 10 soil samples at the beginning and end of 3 months of land treatment. Secondary endpoints of root length and earthworm weight loss were also evaluated. EC50 and LC50 values were calculated using a Trimmed Logit Statistical Program and compared to toxicity of 10 background samples collected from the site. Results for initial soils demonstrated toxicity with three of the five endpoints. End treatment results showed no measurable toxicity using all endpoints. Toxicity testing results are critical for obtaining regulatory approval for the full-scale treatment system. Post treatment closure requirements for the site will be based on bioassay results. Evaluation of the three tests used showed the Microtox test to be the most sensitive to this type of toxicity. Lettuce seed germination results were the least sensitive of the three primary endpoints chosen. Of the secondary endpoint criteria, root length demonstrated reliable EC50 values and showed toxicity trends similar to Microtox and earthworm tests. The earthworm weight loss endpoint was not a useful toxicity measurement at 14 days.

  16. Simple structures test for elastic-plastic strain acceptance criterion validation

    SciTech Connect

    Trimble, T.F.; Krech, G.R.

    1997-11-01

    A Simple Structures Test Program was performed where several cantilevered beam and fixed-end beam test specimens (fabricated from HY-80 steel) were subjected to a series of analytically predetermined rapidly applied transient dynamic input loads. The primary objective of the test program was to obtain dynamic nonlinear response for simple structures subjected to these load inputs. Data derived from these tests was subsequently used to correlate to analysis predictions to assess the capability to analytically predict elastic-plastic nonlinear material behavior in structures using typical time-dependent (transient) design methods and the ABAQUS finite element analysis code. The installation of a significant amount of instrumentation on these specimens and post-test measurements enabled the monitoring and recording of strain levels, displacements, accelerations, and permanent set. An assessment of modeling parameters such as the element type and mesh refinement was made using these test results. In addition, currently available material models and the incremental time step procedure used in the transient analyses were evaluated. Comparison of test data to analysis results shows that displacements, accelerations, and peak strain can be predicted with a reasonable level of accuracy using detailed solid models of the tested specimens. Permanent set is overpredicted by a factor of approximately two. However, the accuracy of the prediction of permanent set is being enhanced by updating material modeling in the ABAQUS code to account for effects of strain reversal in oscillatory behavior of dynamically loaded specimens.

  17. Summary of CPAS EDU Testing Analysis Results

    NASA Technical Reports Server (NTRS)

    Romero, Leah M.; Bledsoe, Kristin J.; Davidson, John.; Engert, Meagan E.; Fraire, Usbaldo, Jr.; Galaviz, Fernando S.; Galvin, Patrick J.; Ray, Eric S.; Varela, Jose

    2015-01-01

    The Orion program's Capsule Parachute Assembly System (CPAS) project is currently conducting its third generation of testing, the Engineering Development Unit (EDU) series. This series utilizes two test articles, a dart-shaped Parachute Compartment Drop Test Vehicle (PCDTV) and capsule-shaped Parachute Test Vehicle (PTV), both of which include a full size, flight-like parachute system and require a pallet delivery system for aircraft extraction. To date, 15 tests have been completed, including six with PCDTVs and nine with PTVs. Two of the PTV tests included the Forward Bay Cover (FBC) provided by Lockheed Martin. Advancements in modeling techniques applicable to parachute fly-out, vehicle rate of descent, torque, and load train, also occurred during the EDU testing series. An upgrade from a composite to an independent parachute simulation allowed parachute modeling at a higher level of fidelity than during previous generations. The complexity of separating the test vehicles from their pallet delivery systems necessitated the use the Automatic Dynamic Analysis of Mechanical Systems (ADAMS) simulator for modeling mated vehicle aircraft extraction and separation. This paper gives an overview of each EDU test and summarizes the development of CPAS analysis tools and techniques during EDU testing.

  18. Analyzing Educational Testing Service Graduate Major Field Test Results

    ERIC Educational Resources Information Center

    Thornton, Barry; Arbogast, Gordon

    2012-01-01

    The Educational Testing Service (ETS) created the Graduate Major Field Test in Business (GMFT-B) for MBA students. This test is administered to all MBA classes at Jacksonville University for the purpose of measuring student academic achievement and growth, as well as to assess educational outcomes. The test is given in the capstone course,…

  19. Increasing the acceptability of HIV counseling and testing with three C's: convenience, confidentiality and credibility.

    PubMed

    Angotti, Nicole; Bula, Agatha; Gaydosh, Lauren; Kimchi, Eitan Zeev; Thornton, Rebecca L; Yeatman, Sara E

    2009-06-01

    Agencies engaged in humanitarian efforts to prevent the further spread of HIV have emphasized the importance of voluntary counseling and testing (VCT), and most high-prevalence countries now have facilities that offer testing free of charge. The utilization of these services is disappointingly low, however, despite high numbers reporting that they would like to be tested. Explanations of this discrepancy typically rely on responses to hypothetical questions posed in terms of psychological or social barriers; often, the explanation is that people fear learning that they are infected with a disease that they understand to be fatal and stigmatizing. Yet when we offered door-to-door rapid blood testing for HIV as part of a longitudinal study in rural Malawi, the overwhelming majority agreed to be tested and to receive their results immediately. Thus, in this paper, we ask: why are more people not getting tested? Using an explanatory research design, we find that rural Malawians are responsive to door-to-door HIV testing for the following reasons: it is convenient, confidential, and the rapid blood test is credible. Our study suggests that attention to these factors in VCT strategies may mitigate the fear of HIV testing, and ultimately increase uptake in rural African settings. PMID:19375208

  20. What Do the Results of Genetic Tests Mean?

    MedlinePlus

    ... genetic tests mean? What do the results of genetic tests mean? The results of genetic tests are ... type of result. For more information about interpreting genetic test results: The National Cancer Institute fact sheet ...

  1. Accelerated aging test results for aerospace wire insulation constructions

    NASA Technical Reports Server (NTRS)

    Dunbar, William G.

    1995-01-01

    Several wire insulation constructions were evaluated with and without continuous glow discharges at low pressure and high temperature to determine the aging characteristics of acceptable wire insulation constructions. It was known at the beginning of the test program that insulation aging takes several years when operated at normal ambient temperature and pressure of 20 C and 760 torr. Likewise, it was known that the accelerated aging process decreases insulation life by approximately 50% for each 10 C temperature rise. Therefore, the first phases of the program, not reported in these test results, were to select wire insulation constructions that could operate at high temperature and low pressure for over 10,000 hours with negligible shrinkage and little materials' deterioration.The final phase of the program was to determine accelerated aging characteristics. When an insulation construction is subjected to partial discharges the insulation is locally heated by the bombardment of the discharges, the insulation is also subjected to ozone and other deteriorating gas particles that may significantly increase the aging process. Several insulation systems using either a single material or combinations of teflon, kapton, and glass insulation constructions were tested. All constructions were rated to be partial discharge and/or corona-free at 240 volts, 400 Hz and 260 C (500 F) for 50, 000 hours at altitudes equivalent to the Paschen law. Minimum partial discharge aging tests were preceded by screening tests lasting 20 hours at 260 C. The aging process was accelerated by subjecting the test articles to temperatures up to 370 C (700 F) with and without partial discharges. After one month operation with continuous glow discharges surrounding the test articles, most insulation systems were either destroyed or became brittle, cracked, and unsafe for use. Time with space radiation as with partial discharges is accumulative.

  2. Report on the Acceptance Test of the CRI Y-MP 8128, 10 February - 12 March 1990

    NASA Technical Reports Server (NTRS)

    Carter, Russell; Kutler, Paul (Technical Monitor)

    1998-01-01

    The NAS Numerical Aerodynamic Simulation Facility's HSP 2 computer system, a CRI Y-MP 832 SN #1002, underwent a major hardware upgrade in February of 1990. The 32 MWord, 6.3 ns mainframe component of the system was replaced with a 128 MWord, 6.0 ns CRI Y-MP 8128 mainframe, SN #1030. A 30 day Acceptance Test of the computer system was performed by the NAS RND HSP group from 08:00 February 10, 1990 to 08:00 March 12, 1990. Overall responsibility for the RND HSP Acceptance Test was assumed by Duane Carbon. The terms of the contract required that the SN #1030 achieve an effectiveness level of greater than or equal to ninety (90) percent for 30 consecutive days within a 60 day time frame. After the first thirty days, the effectiveness level of SN #1030 was 94.4 percent, hence the acceptance test was passed.

  3. Power Actuation and Switching Module Test Results

    NASA Technical Reports Server (NTRS)

    Carr, Greg; Deligiannis, Frank; Franco, Lauro; Jones, Loren; Lam, Barbara; Nelson, Ron; Pantaleon, Jose; Ruiz, Ian; Treichler, John; Wester, Gene

    2006-01-01

    The X2000 Power System Electronics (PSE) is a Jet Propulsion Laboratory (JPL) task to develop a new generation of power system building blocks for use on future deep-space missions. The effort includes the development of electronic components and modules that can be used as building blocks in the design of generic spacecraft power systems. All X2000 avionics components and modules are designed for use in centralized or distributed spacecraft architectures. The Power Actuation and Switching Module (PASM) has been developed under the X2000 program. This component enables a modular and scalable design approach for power switching applications, which can result in a wide variety of power switching architectures using this simple building block. The PASM is designed to provide most of the necessary power switching functions of spacecraft for various Deep Space missions including future missions to Mars, comets, Jupiter and its moons. It is fabricated using an ASIC process that is tolerant of high radiation. The development included two application specific integrated circuits (ASICs) and support circuitry all packaged using High Density Interconnect (HDI) technology. It can be operated in series or parallel with other PASMs. It can be used as a high-side or low-side switch and it can drive thruster valves, pyrotechnic devices such as NASA standard initiators, bus shunt resistors, and regular spacecraft component loads. Each PASM contains two independent switches with internal current limiting and over-current trip-off functions to protect the power subsystem from load faults. During turnon and turnoff each switch can limit the rate of current change (di/dt) to a value determined by the user. Three-way majority-voted On/Off commandability and full switch status telemetry (both analog and digital) are built into the module. This paper is a follow up to the one presented at he IECEC 2004 conference that will include the lessons learned and test results from the development.

  4. Nickel hydrogen cell characterization test results

    NASA Technical Reports Server (NTRS)

    Otzinger, B.

    1980-01-01

    Charge control studies on nickel hydrogen cells are discussed. Characterization test data for the cells are presented in graphical form. The test areas covered were capacity versus temperature, ampere-hour cycling efficiency, and the charge method which involved voltage level with current limiting.

  5. Heaf test results after neonatal BCG.

    PubMed Central

    Crawshaw, P A; Thomson, A H

    1988-01-01

    Heaf testing was carried out on 98 preschool Asian children who had received a BCG vaccination. A strongly positive Heaf reaction (grade 3) occurred in only two children. Heaf testing can still be used in tuberculosis screening after neonatal BCG. PMID:3232997

  6. MAC Version 3.2, MBA Version 1.3 acceptance test summary report

    SciTech Connect

    Russell, V.K.

    1994-11-02

    The K Basins Materials Accounting (MAC) and Materials Balance (MBA) programs had the Paradox Conversion to 4.0 ATP run to check out the systems. This report describes the results of the test and provides the signoff sheets associated with the testing. The test primarily concentrated on verifying that MAC and MBA software would run properly in the Paradox 4.0 environment. Changes in the MAC and MBA programs were basically limited to superficial items needed to accommodate the enhanced method of execution.

  7. En route noise of turboprop aircraft and their acceptability: Report of tests

    NASA Technical Reports Server (NTRS)

    Held, Wolf

    1990-01-01

    The development of propfan-powered aircraft has been observed with great interest. It is obvious that during cruising flight, the aircraft powerplant (propellers) cause a noise clearly perceivable on the ground. It is the audible frequency spectrum of the propfan powerplants relative to the high tip speeds that presents the problem. A flight test was conducted on 30 April, 1989 at the Frankfurt Airport. Results of the test flight are present.

  8. Acceptability, predictors and attitudes of Canadian women in labour toward point-of-care HIV testing at a single labour and delivery unit

    PubMed Central

    Iqbal, Salikah; De Souza, Leanne R; Yudin, Mark H

    2014-01-01

    OBJECTIVE: To assess attitudes and opinions surrounding point-of-care HIV testing among Canadian women, and to determine predictors for acceptance of testing. METHODS: A survey assessing acceptability and attitudes toward rapid HIV testing was distributed on the labour and delivery unit in an academic hospital (St Michael’s Hospital) in Toronto, Ontario, in 2011. Information collected included demographic data, health and pregnancy history, willingness to undergo rapid HIV testing while in labour and barriers to testing. RESULTS: Responses in 92 completed questionnaires were analyzed. The mean age of respondents was 32 years and all were HIV negative. Twelve percent of patients reported having at least one risk factor for HIV transmission. The study showed that only 59% of women were willing to be tested at the time of survey completion, and these women stated that they would accept saliva, urine or serum testing. If found to be positive, 96% would accept antiretroviral treatment and 94% would formula feed their infants. Of the 41% who were not willing to be tested, their reasons for refusal included “don’t want to know” (39%) and being in “too much labour pain” (29%). Regardless of willingness to be tested, the most frequently cited barriers to testing were social stigma (64%) and reaction from partners (69%). CONCLUSIONS: Canadian women in labour were willing to undergo rapid HIV testing via urine, saliva or serum. If found to be positive, women were willing to undergo treatment and to formula feed to prevent mother-to-child transmission of HIV. PMID:25285124

  9. X-48B Preliminary Flight Test Results

    NASA Technical Reports Server (NTRS)

    Taylor, Brian R.

    2009-01-01

    This slide presentation reviews the preliminary Flight tests of the X-48B development program. The X-48B is a blended wing body aircraft that is being used to test various features of the BWB concept. The research concerns the following: (1) Turbofan Development, (2) Intelligent Flight Control and Optimization, (3) Airdata Calibration (4) Parameter Identification (i.e., Determination of the parameters of a mathematical model of a system based on observation of the system inputs and response.)

  10. 40 CFR 86.1830-01 - Acceptance of vehicles for emission testing.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) General Compliance Provisions for Control of Air Pollution From New and In-Use Light-Duty Vehicles, Light-Duty Trucks, and Complete Otto-Cycle Heavy-Duty Vehicles § 86.1830-01 Acceptance...

  11. 40 CFR 86.1830-01 - Acceptance of vehicles for emission testing.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) General Compliance Provisions for Control of Air Pollution From New and In-Use Light-Duty Vehicles, Light-Duty Trucks, and Complete Otto-Cycle Heavy-Duty Vehicles § 86.1830-01 Acceptance...

  12. 40 CFR 86.1830-01 - Acceptance of vehicles for emission testing.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) General Compliance Provisions for Control of Air Pollution From New and In-Use Light-Duty Vehicles, Light-Duty Trucks, and Complete Otto-Cycle Heavy-Duty Vehicles § 86.1830-01 Acceptance...

  13. 40 CFR 86.1830-01 - Acceptance of vehicles for emission testing.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) General Compliance Provisions for Control of Air Pollution From New and In-Use Light-Duty Vehicles, Light-Duty Trucks, and Complete Otto-Cycle Heavy-Duty Vehicles § 86.1830-01 Acceptance...

  14. Comparative evaluation of two commonly accepted tests for adjustment of fixed prosthetic constructions.

    PubMed

    Kissov, H K; Todorova, B P

    2001-01-01

    Regardless of the great advance in prosthetic dentistry related to the development of new more elaborate materials and methods, the dentist must often correct some defects of the newly fabricated prosthetic constructions. In dentistry practice worldwide two tests for adjustment of fixed prosthetic constructions are applied most often - the silicone test and the suspension of Fe2O3 (rouge) and chloroform. The capabilities of the suspension of chloroform and rouge to assess the preliminary contacts between the prosthetic construction and the dental tissues haven't been reviewed in the dentistry literature in Bulgaria. The test is not familiar to the practicing dentists and this is an obstacle for its wide application in everyday practice. The purpose of the current study was to compare the advantages and disadvantages of the silicone test and the modified suspension of halothane and rouge recommended in the recent years. The assessment of the capabilities of the two tests for adjustment is based on the results of their application in the adjustment of crowns and bridges on the working model and on the prosthetic field. The results demonstrate that the two tests have different capabilities in different clinical situations and their concomitant use will allow more precise prosthetic treatment. PMID:15354473

  15. Relating results from earthworm toxicity tests to agricultural soil

    USGS Publications Warehouse

    Beyer, W.N.

    1992-01-01

    The artificial soil tests of the European Economic Community and of the Organization for Economic Cooperation produce data relating earthworm mortality to pesticide concentrations in soil under laboratory conditions. To apply these results to agricultural soils it is necessary to relate these concentrations to amounts of pesticide applied per area. This paper reviews the relevant published literature and suggests a simple relation for regulatory use. Hazards to earthworms from pesticides are suggested to be greatest soon after application, when the pesticides may be concentrated in a soil layer a few millimeters thick. For estimating exposure of earthworms, however, a thicker soil layer should be considered, to account for their movement through soil. During favorable weather conditions, earthworms belonging to species appropriate to the artificial soil test have been reported to confine their activity to a layer about 5 cm. If a 5-cm layer is accepted as relevant for regulatory purposes, then an application of 1 kg/ha would be equivalent to 1-67 ppm (dry) in the artificial soil test.

  16. Development and acceptability testing of ready-to-use supplementary food made from locally available food ingredients in Bangladesh

    PubMed Central

    2014-01-01

    Background Inadequate energy and micronutrient intake during childhood is a major public health problem in developing countries. Ready-to-use supplementary food (RUSF) made of locally available food ingredients can improve micronutrient status and growth of children. The objective of this study was to develop RUSF using locally available food ingredients and test their acceptability. Methods A checklist was prepared of food ingredients available and commonly consumed in Bangladesh that have the potential of being used for preparing RUSF. Linear programming was used to determine possible combinations of ingredients and micronutrient premix. To test the acceptability of the RUSF compared to Pushti packet (a cereal based food-supplement) in terms of amount taken by children, a clinical trial was conducted among 90 children aged 6–18 months in a slum of Dhaka city. The mothers were also asked to rate the color, flavor, mouth-feel, and overall liking of the RUSF by using a 7-point Hedonic Scale (1 = dislike extremely, 7 = like extremely). Results Two RUSFs were developed, one based on rice-lentil and the other on chickpea. The total energy obtained from 50 g of rice-lentil, chickpea-based RUSF and Pushti packet were 264, 267 and 188 kcal respectively. Children were offered 50 g of RUSF and they consumed (mean ± SD) 23.8 ± 14 g rice-lentil RUSF, 28.4 ± 15 g chickpea based RUSF. Pushti packet was also offered 50 g but mothers were allowed to add water, and children consumed 17.1 ± 14 g. Mean feeding time for two RUSFs and Pushti packet was 20.9 minutes. Although the two RUSFs did not differ in the amount consumed, there was a significant difference in consumption between chickpea-based RUSF and Pushti packet (p = 0.012). Using the Hedonic Scale the two RUSFs were more liked by mothers compared to Pushti packet. Conclusions Recipes of RUSF were developed using locally available food ingredients. The study results suggest that rice

  17. Time and Temperature Test Results for PFP Thermal Stabilization Furnaces

    SciTech Connect

    COMPTON, J.A.

    2000-08-09

    The national standard for plutonium storage acceptability (standard DOE-STD-3013-99, generally known as ''the 3013 standard'') has been revised to clarify the requirement for processes that will produce acceptable storage materials. The 3013 standard (Reference 1) now states that ''Oxides shall be stabilized by heating the material in an oxidizing atmosphere to a Material Temperature of at least 950 C (1742 F) for not less than 2 hours.'' The process currently in use for producing stable oxides for storage at the Plutonium Finishing Plant (PFP) heats a furnace atmosphere to 1000 C and holds it there for 2 hours. The temperature of the material being stabilized is not measured directly during this process. The Plutonium Process Support Laboratories (PPSL) were requested to demonstrate that the process currently in use at PFP is an acceptable method of producing stable plutonium dioxide consistently. A spare furnace identical to the production furnaces was set up and tested under varying conditions with non-radioactive surrogate materials. Reference 2 was issued to guide the testing program. The process currently in use at the PFP for stabilizing plutonium-bearing powders was shown to heat all the material in the furnace to at least 950 C for at least 2 hours. The current process will work for (1) relatively pure plutonium dioxide, (2) dioxide powders mixed with up to 20 weight percent magnesium oxide, and (3) dioxide powders with up to 11 weight percent magnesium oxide and 20 weight percent magnesium nitrate hexahydrate. Time and temperature data were also consistent with a successful demonstration for a mixture containing 10 weight percent each of sodium and potassium chloride; however, the molten chloride salts destroyed the thermocouples in the powder and temperature data were unavailable for part of that run. These results assume that the current operating limits of no more than 2500 grams per furnace charge and a powder height of no more than 1.5 inches remain

  18. The STAR EM calorimeter design and small prototype test results

    SciTech Connect

    Underwood, D.G.

    1995-01-01

    The basis for several design features of The STAR Electromagnetic Calorimeter and Shower Maximum Detector is presented. This includes some of the tile-fiber optical design. The authors describe both the barrel and the end cap. Some preliminary analysis of electron acceptance vs pion rejection in test beam data is also discussed.

  19. Three Decades of Anti-evolution Campaign and its Results: Turkish Undergraduates' Acceptance and Understanding of the Biological Evolution Theory

    NASA Astrophysics Data System (ADS)

    Peker, Deniz; Comert, Gulsum Gul; Kence, Aykut

    2010-06-01

    Even though in the early years of the Republic of Turkey Darwin’s theory of evolution was treated as a scientific theory and taught fairly in schools, despite all the substantial evidence accumulated supporting the theory of evolution since then, Darwin and his ideas today have been scorned by curriculum and education policy makers. Furthermore, Turkish students and academics have been faced with unprecedented creationist propaganda for many years. In this paper, we first provide a glimpse of the theory of evolution and creationism in Turkey, we then report the results of our survey study ( N = 1,098) about the undergraduates’ acceptance and understanding of Darwinian evolution and some of the socioeconomic variables affecting those measures. Our cross sectional study shows that acceptance and understanding of the theory of evolution is quite low. We criticize the current state of evolution education in Turkey and call for a change towards a scientific treatment of the theory evolution in schools.

  20. Cryogenic optical testing results of JWST aspheric test plate lens

    NASA Astrophysics Data System (ADS)

    Smith, Koby Z.; Towell, Timothy C.

    2011-09-01

    The James Webb Space Telescope (JWST) Secondary Mirror Assembly (SMA) is a circular 740mm diameter beryllium convex hyperboloid that has a 23.5nm-RMS (λ/27 RMS) on-orbit surface figure error requirement. The radius of curvature of the SMA is 1778.913mm+/-0.45mm and has a conic constant of -1.6598+/-0.0005. The on-orbit operating temperature of the JWST SMA is 22.5K. Ball Aerospace & Technologies Corp. (BATC) is under contract to Northrop Grumman Aerospace Systems (NGAS) to fabricate, assemble, and test the JWST SMA to its on-orbit requirements including the optical testing of the SMA at its cryogenic operating temperature. BATC has fabricated and tested an Aspheric Test Plate Lens (ATPL) that is an 870mm diameter fused silica lens used as the Fizeau optical reference in the ambient and cryogenic optical testing of the JWST Secondary Mirror Assembly (SMA). As the optical reference for the SMA optical test, the concave optical surface of the ATPL is required to be verified at the same 20K temperature range required for the SMA. In order to meet this objective, a state-of-the-art helium cryogenic testing facility was developed to support the optical testing requirements of a number of the JWST optical testing needs, including the ATPL and SMA. With the implementation of this cryogenic testing facility, the ATPL was successfully cryogenically tested and performed to less than 10nm-RMS (λ/63 RMS) surface figure uncertainty levels for proper reference backout during the SMA optical testing program.

  1. Results from Grimethorpe PFBC turbine cascade tests

    SciTech Connect

    Not Available

    1986-12-01

    The test program at the Grimethorpe Pressurized Fluidized-Bed Combustion (PFBC) facility included an assessment of the potential for deposition, corrosion, and erosion of gas turbine blade materials when exposed to PFBC off gases. Flue gas from the combustor was fed through three stages of cyclones before entering the cascade. The impulse foils were approximately the size and shape of the first stage blades in the GE MS-1002 gas turbine. The cascade operated through three test series, accumulating a total of 649 hours. The conditions experienced are summarized. The paper lists the alloys tested, and discusses the efficiency of the cyclones, the particle size distribution of the dusts not removed by the cyclones, and corrosion of the turbine blades. 4 references, 1 figure, 2 tables.

  2. Flexible Ablators Char Depths LHMEL Test Results

    NASA Technical Reports Server (NTRS)

    White, Susan; Qu, Vince; Fan, Wendy; Stackpoole, Mairead; Thornton, Jeremy

    2012-01-01

    Char and pyrolysis zone depths give physical evidence of peak temperature reached in depth: The pyrolyzing material acts as a temperature indicator within its characteristic thermal decomposition range. A matrix of novel flexible ablators were laser tested in one component of material screening for NASA Entry, Descent and Landing research for future Mars missions. LHMEL tests were run both on virgin materials, and on previously charred materials for a dual pulse simulation of the heating due to aerocapture followed by atmospheric entry. The test models were machined to expose the cross-sections. Char measurements were made at three locations near the center of the exposed area. Data are presented showing the char depths developed in these flexible materials, grouped by reinforcing fiber and pyrolyzing material type.

  3. The seven Cs of the high acceptability of home-based VCT: results from a mixed methods approach in Zambia.

    PubMed

    Jürgensen, Marte; Sandøy, Ingvild F; Michelo, Charles; Fylkesnes, Knut; Mwangala, Sheila; Blystad, Astrid

    2013-11-01

    HIV testing and counselling is a critical gateway to prevention and treatment. Yet, coverage remains insufficient, few couples are tested together and gender differences in access exist. We used an embedded mixed methods approach to investigate possible explanations for the high acceptance of home-based voluntary HIV counselling and testing (HB-VCT) in a pair-matched cluster-randomized trial in Zambia. A baseline survey included 1694 individuals in 36 clusters. Adults in 18 intervention clusters were offered HB-VCT by lay counsellors. Standard testing services were available in both trial arms. After the completion of the intervention, a follow-up survey was conducted in all trial clusters. In addition, 21 in-depth interviews and one focus group discussion were conducted with home-based VCT clients in the intervention arm. Informants favoured the convenience, confidentiality and credibility of HB-VCT. Counsellors were perceived as trustworthy owing to their closeness and conduct, and the consent process was experienced as convincing. Couple testing was selected by 70% of cohabiting couples and was experienced as beneficial by both genders. Levels of first-time testing (68% vs. 29%, p < 0.0001) and re-testing (94% vs. 74%, p < 0.0001) were higher in the intervention than in the control arm. Acceptance of HIV testing and counselling is dependent on stigma, trust and gender. The confidentiality of home-based VCT was essential for overcoming stigma-related barriers, and the selection of local counsellors was important to ensure trust in the services. The high level of couple counselling within HB-VCT may contribute to closing the gender gap in HIV testing, and has benefits for both genders and potentially for prevention of HIV transmission. The study demonstrates the feasibility of achieving high test coverage with an opt-in consent approach. The embedded qualitative component confirmed the high satisfaction with HB-VCT reported in the quantitative survey and was

  4. Avco Lycoming emission and flight test results

    NASA Technical Reports Server (NTRS)

    Duke, L. C.

    1976-01-01

    The Avco Lycoming flight test program for reduced emissions was conducted to determine and document the lean fuel schedule limits for current production aircraft based on flight safety. Based on analysis of the emissions profile, Avco Lycoming proposed to evaluate the effect of leaner schedules in the idle/taxi, climb, and approach modes. These modes were selected as areas where it was felt that possible improvements could be made with the greatest improvement in cyclic emissions reduction. The fuel systems to produce these leaner stepped fuel schedules were tailored specifically for the flight test.

  5. Gifted Adolescents: A Handbook of Test Results.

    ERIC Educational Resources Information Center

    Welsh, George S.

    The Governor's School of North Carolina is a residential summer program for talented and gifted juniors and seniors from all over the state. It is designed to provide a distinctive educational experience and to serve as an experimental laboratory for innovative instruction. This handbook reports on an extensive testing program carried out at the…

  6. Phase C Flygt Mixer Test Results

    SciTech Connect

    Poirier, M.R.

    1999-06-08

    The Savannah River Site (SRS) teamed with the Pacific Northwest National Laboratory (PNNL), Oak Ridge National Laboratory (ORNL), and ITT Flygt Corporation to conduct a test program evaluating shrouded axial propeller mixers (Flygt mixers) for heel removal in SRS Tank 19. SRS is identifying and investigating techniques to remove sludge heels from waste tanks such as Tank 19.

  7. Liquid Motion Experiment Flight Test Results

    NASA Technical Reports Server (NTRS)

    Chato David J.; Dalton, Penni J.; Dodge, Franklin T.; Green, Steve

    1998-01-01

    The Liquid Motion Experiment (LME), designed to study the effects of liquid motion in rotating tanks, was flown on STS 84. LME was essentially a spin table that created a realistic nutation motion of scale-model tanks containing liquid. TWo spherical and two cylindrical transparent tanks were tested simultaneously, and three sets of such tanks were employed to vary liquid viscosity, fill level, and propellant management device (PMD) design. All the tanks were approximately 4.5 inches diameter. The primary test measurements were the radial and tangential torques exerted on the tanks by the liquid. Resonant frequencies and damping of the liquid oscillations were determined by sine sweep tests. For a given tank shape, the resonant frequency depended on fill level. For the cylindrical tanks, the resonances had somewhat different frequencies for the tangential axis (0.55 to 0.75 times spin rate) and the radial axis (0.73 to 0.78 times spin rate), and the tangential axis resonance agreed more closely with available analytical models. For the spherical tanks, the resonant frequencies were between 0.74 to 0.77 times the spin rate and were the same for the tangential and radial axes. The damping coefficients varied from about I% to 3% of critical, depending on tank shape, fill level, and liquid viscosity. 'Me viscous energy dissipation rates of the liquid oscillations were determined from sine dwell tests. The LME energy dissipation rates varied from 0.3 to 0.5 times the estimates obtained from scaling previous ground tests and spacecraft flight data. The PNDs sometimes enhanced the resonances and energy dissipation rates and sometimes decreased them, which points out the need to understand better the effects of PMD on liquid motion as a function of PMD and tank design.

  8. Acceptability and feasibility of using established geosocial and sexual networking mobile applications to promote HIV and STD testing among men who have sex with men.

    PubMed

    Sun, Christina J; Stowers, Jason; Miller, Cindy; Bachmann, Laura H; Rhodes, Scott D

    2015-03-01

    This study is the first published multi-app study, of which we are aware, to evaluate both the acceptability and feasibility of providing sexual health information and HIV/STD testing referrals via established geosocial and sexual networking apps for MSM. Data were collected using an online survey and through four apps (A4A Radar, Grindr, Jack'd, and Scruff). Two-thirds (64 %) found apps to be an acceptable source for sexual health information. MSM who found apps as acceptable were more likely non-white, not sure of their current HIV status, and have low HIV testing self-efficacy. One-quarter (26 %) of informational chats with the health educator resulted in users requesting and being referred to local HIV/STD testing sites. There were significant differences in the number and types of interactions across apps. Established apps designed for MSM may be both an acceptable and feasible platform to promote HIV/STD testing. Future research should evaluate interventions that leverage this technology. PMID:25381563

  9. Acceptability and feasibility of using established geosocial and sexual networking mobile applications to promote HIV and STD testing among men who have sex with men

    PubMed Central

    Sun, Christina J.; Stowers, Jason; Miller, Cindy; Bachmann, Laura H.; Rhodes, Scott D.

    2014-01-01

    This study is the first published multi-app study, of which we are aware, to evaluate both the acceptability and feasibility of providing sexual health information and HIV/STD testing referrals via established geosocial and sexual networking apps for MSM. Data were collected using an online survey and through four apps (A4A Radar, Grindr, Jack’d, and Scruff). Two-thirds (64%) found apps to be an acceptable source for sexual health information. MSM who found apps as acceptable were more likely non-white men, not sure of their current HIV status, and have low HIV testing self-efficacy. One-quarter (26%) of informational chats with the health educator resulted in users requesting and being referred to local HIV/STD testing sites. There were significant differences in the number and types of interactions across apps. Established apps for MSM may be both an acceptable and feasible platform to promote HIV/STD testing. Future research should evaluate interventions that leverage this technology. PMID:25381563

  10. Empirical Testing of a Theoretical Extension of the Technology Acceptance Model: An Exploratory Study of Educational Wikis

    ERIC Educational Resources Information Center

    Liu, Xun

    2010-01-01

    This study extended the technology acceptance model and empirically tested the new model with wikis, a new type of educational technology. Based on social cognitive theory and the theory of planned behavior, three new variables, wiki self-efficacy, online posting anxiety, and perceived behavioral control, were added to the original technology…

  11. 10 CFR 51.108 - Public hearings on Commission findings that inspections, tests, analyses, and acceptance criteria...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... CFR 52.103(b), the Commission will not admit any contentions on environmental issues, the adequacy of... finding under 10 CFR 52.103(g). materials licenses ..., tests, analyses, and acceptance criteria of combined licenses are met. 51.108 Section 51.108...

  12. Preliminary Results of Field Emission Cathode Tests

    NASA Technical Reports Server (NTRS)

    Sovey, James S.; Kovaleski, Scott D.

    2001-01-01

    Preliminary screening tests of field emission cathodes such as chemical vapor deposited (CVD) diamond, textured pyrolytic graphite, and textured copper were conducted at background pressures typical of electric thruster test facilities to assess cathode performance and stability. Very low power electric thrusters which provide tens to hundreds micronewtons of thrust may need field emission neutralizers that have a capability of tens to hundreds of microamperes. From current voltage characteristics, it was found that the CVD diamond and textured metals cathodes clearly satisfied the Fowler-Nordheim emission relation. The CVD diamond and a textured copper cathode had average current densities of 270 and 380 mA/sq cm, respectively, at the beginning-of-life. After a few hours of operation the cathode emission currents degraded by 40 to 75% at background pressures in the 10(exp -5) Pa to 10(exp -4) Pa range. The textured pyrolytic graphite had a modest current density at beginning-of-life of 84 mA/sq cm, but this cathode was the most stable of all. Extended testing of the most promising cathodes is warranted to determine if current degradation is a burn-in effect or whether it is a long-term degradation process. Preliminary experiments with ferroelectric emission cathodes, which are ceramics with spontaneous electric polarization, were conducted. Peak current densities of 30 to 120 mA/sq cm were obtained for pulse durations of about 500 ns in the 10(exp -4) Pa pressure range.

  13. ZR Marx capacitor vendor evaluation and lifetime test results.

    SciTech Connect

    Ziska, Gerold Raymond; Savage, Mark Edward; Smith, David Lewis; Starbird, Robert L.

    2004-08-01

    The Z machine at Sandia National Laboratories (SNL) is the world's largest and most powerful laboratory X-ray source. The Z Refurbishment Project (ZR) is presently underway to provide an improved precision, more shot capacity, and a higher current capability. The ZR upgrade has a total output current requirement of at least 26 MA for a 100-ns standard Z-pinch load. To accomplish this with minimal impact on the surrounding hardware, the 60 high-energy discharge capacitors in each of the existing 36 Marx generators must be replaced with identical size units but with twice the capacitance. Before the six-month shut down and transition from Z to ZR occurs, 2500 of these capacitors will be delivered. We chose to undertake an ambitious vendor qualification program to reduce the risk of not meeting ZR performance goals, to encourage the pulsed-power industry to revisit the design and development of high- energy discharge capacitors, and to meet the cost and delivery schedule within the ZR project plans. Five manufacturers were willing to fabricate and sell SNL samples of six capacitors each to be evaluated. The 8000-shot qualification test phase of the evaluation effort is now complete. This paper summarizes how the 0.279 x 0.356 x 0.635-m (11 x 14 x 25-in) stainless steel can, Scyllac-style insulator bushing, 2.65-{micro}F, < 30-nH, 100-kV, 35%-reversal capacitor lifetime specifications were determined, briefly describes the nominal 260-kJ test facility configuration, presents the test results of the most successful candidates, and discusses acceptance testing protocols that balance available resources against performance, cost, and schedule risk. We also summarize the results of our accelerated lifetime testing of the selected General Atomics P/N 32896 capacitor. We have completed lifetime tests with twelve capacitors at 100 kV and with fourteen capacitors at 110-kV charge voltage. The means of the fitted Weibull distributions for these two cases are about 17,000 and 10

  14. Results from the Bell Canyon borehole plugging test

    SciTech Connect

    Christensen, C. L.

    1980-01-01

    The BHP is an integrated program involving consequence assessment and plug performance calculations, materials evaluation, instrumentation development and field testing, and interfaces directly with other WIPP-related activities. This paper describes an in situ test conducted under the BHP Field Test Task. The Bell Canyon Test was conducted to evaluate candidate grout plugging mixes and plug emplacement techniques, and to assess plug performance under in-situ cure conditions. Laboratory testing of the brine-grout/rock combination revealed an adverse reaction between the brine-grout and the anhydrite. This discovery permitted a timely change to an additional laboratory compatibility testing program with an alternate fresh-water mix to permit maintenance of the test schedule with little delay. While cement emplacement technology is generally adequate to satisfy repository plugging requirements, plug compatibility with the host rock must be carefully assessed for each repository site. Generally accepted laboratory cement-testing techniques need to include flow characteristics and geochemical stability.

  15. Test results for robotic manipulator EMMA

    SciTech Connect

    Ramsower, D.C.

    1996-07-30

    Testing was performed at the National Institute of Standards and Technology (NIST) headquarters in Gaithersburg, Maryland, where Grey Pilgrim has experimental space available under a Cooperative R & D Agreement (CRADA) with NIST. Under the CRADA, Grey Pilgrim is tasked with developing a version of EMMA suitable for deployment of a stereo camera on a NIST RoboCrane, a mobile platform with applications to several industrial environments (including hazardous materials) based on the concept of the Steward Platform, a structure with great strength and a minimum of material.

  16. The 757 NLF glove flight test results

    NASA Technical Reports Server (NTRS)

    Runyan, L. Jim; Bielak, G. W.; Behbehani, R. A.; Chen, A. W.; Rozendaal, Roger A.

    1987-01-01

    A major concern in the application of a laminar flow wing design to commercial transports is whether laminar flow can be sustained in the presence of the noise environment due to wing mounted turbofan engines. To investigate this issue, a flight test program was conducted using the Boeing 757 flight research airplane with a portion of the wing modified to obtain natural laminar flow. The flight test had two primary objectives. The first was to measure the noise levels on the upper and lower surface of the wing for a range of flight conditions. The second was to investigate the effect of engine noise on laminar boundary layer transition. The noise field on the wing and transition location on the glove were then measured as a function of the engine power setting at a given flight condition. The transition and noise measurement on the glove show that there is no apparent effect of engine noise on the upper surface transition location. On the lower surface, the transition location moved forward 2 to 3 percent chord. A boundary layer stability analysis to the flight data showed that cross flow disturbances were the dominant cause of transition at most flight conditions.

  17. 76 FR 27925 - Requirements for Maintenance of Inspections, Tests, Analyses, and Acceptance Criteria

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-13

    ...) part 52, ``Licenses, Certifications, and Approvals for Nuclear Power Plants,'' on April 18, 1989 (54 FR... construction was complete. See 54 FR 15371; April 18, 1989; at 15383 (second column). On August 28, 2007 (72 FR... Section 189.a(1)(B) of the AEA threshold for requesting a hearing on acceptance criteria. See 72 FR...

  18. Hanford immobilized LAW product acceptance: Initial Tanks Focus Area testing data package

    SciTech Connect

    JD Vienna; A Jiricka; BP McGrail; BM Jorgensen; DE Smith; BR Allen; JC Marra; DK Peeler; KG Brown; IA Reamer; WL Ebert

    2000-03-08

    The Hanford Site's mission has been to produce nuclear materials for the US Department of Energy (DOE) and its predecessors. A large inventory of radioactive and mixed waste, largely generated during plutonium production, exists in 177 underground single- and double-shell tanks. These wastes are to be retrieved and separated into low-activity waste (LAW) and high-level waste (HLW) fractions. The total volume of LAW requiring immobilization will include the LAW separated from the tank waste, as well as new wastes generated by the retrieval, pretreatment, and immobilization processes. Per the Tri-Party Agreement (1994), both the LAW and HLW will be vitrified. It has been estimated that vitrification of the LAW waste will result in over 500,000 metric tons or 200,000 m{sup 3} of immobilized LAW (ILAW) glass. The ILAW glass is to be disposed of onsite in a near-surface burial facility. It must be demonstrated that the disposal system will adequately retain the radionuclides and prevent contamination of the surrounding environment. This report describes a study of the impacts of systematic glass-composition variation on the responses from accelerated laboratory corrosion tests of representative LAW glasses. A combination of two tests, the product consistency test and vapor-hydration test, is being used to give indictations of the relative rate at which a glass could be expected to corrode in the burial scenario.

  19. Recent results of the GAINS test flight

    NASA Astrophysics Data System (ADS)

    Girz, C.

    A demonstration flight of the Global Atmosphere-ocean IN-situ System (GAINS) Prototype III balloon is scheduled to occur in early summer 2002. The 18-m diameter PIII superpressure balloon, built by GSSL, Inc., will float a 135-kg payload at 16 km. Performance of the SpectraTM envelope will be assessed over two day-night cycles. The payload consists of line-of-sight communications for transmitting GPS position, and monitored parameters on balloon and payload state and the internal and external thermal environments. Primary termination is by radio command with several independent backup termination systems. Safe operation of the balloon is ensured by an onboard transponder that keeps the balloon under active air traffic control. The balloon is tracked by an aircraft that will record communications from the balloon and instigate termination of the flight. Mobile ground stations positioned at the launch and recovery locations will also be capable of recording and terminating the flight. A suite of trajectory forecast tools has been developed based on radiosondes and winds from numerical weather models. A GPS surface reflection experiment for determining ocean surface winds will be tested on this platform. Physical and electronic integration of the radio and mechanical systems was completed over the last two years. Data and videos from the June flight will be presented.

  20. Airlift recirculation well test results -- Southern sector

    SciTech Connect

    White, R.M.; Hiergesell, R.A.

    1997-08-01

    Chlorinated solvents used in the A and M-Areas at the Savannah River Site (SRS) from 1952--1982 have contaminated the groundwater under the site. A plume of groundwater contaminated with trichloroethylene (TCE) and perchloroethylene (PCE) in the Lost Lake aquifer is moving generally southward with the natural flow of groundwater. To comply with the requirements of the current SCDHEC Part B Permit, a series of wells is being installed to contain and treat the plume. Airlift Recirculation Wells (ARW) are a new and innovative technology with potential for more cost effective implementation than conventional pump and treat systems. Two Airlift Recirculation Wells have been installed and tested to quantify performance parameters needed to locate a line of these wells along the leading edge of the contaminant plume. The wells proved to be very sensitive to proper development, but after this requirement was met, performance was very good. The Zone of Capture has been estimated to be within a radius of 130--160 ft. around the wells. Thus a line of wells spaced at 250 ft. intervals could intercept the contaminant plume. At SSR-012, TCE was stripped from the groundwater at approximately 1.2 lb./day. The longer term effect of the recirculation wells upon the plume and the degree of recirculation within the aquifer itself will require additional data over a longer time period for an accurate review. Data collection is ongoing.

  1. Panoramic night vision goggle flight test results

    NASA Astrophysics Data System (ADS)

    Franck, Douglas L.; Geiselman, Eric E.; Craig, Jeffrey L.

    2000-06-01

    The Panoramic Night Vision Goggle (PNVG) has begun operational test and evaluation with its 100-degree horizontal by 40-degree vertical field of view (FOV) on different aircraft and at different locations. Two configurations of the PNVG are being evaluated. The first configuration design (PNVG I) is very low in profile and fits underneath a visor. PNVG I can be retained by the pilot during ejection. This configuration is interchangeable with a day helmet mounted tracker and display through a standard universal connector. The second configuration (PNVG II) resembles the currently fielded 40-degree circular FOV Aviator Night Vision Imaging Systems (ANVIS) and is designed for non-ejection seat aircraft and ground applications. Pilots completed subjective questionnaires after each flight to compare the capability of the 100-degree horizontal by 40-degree vertical PNVG to the 40-degree circular ANVIS across different operational tasks. This paper discusses current findings and pilot feedback from the flight trials objectives of the next phase of the PNVG program are also discussed.

  2. Flight Test Results for the NICMOS Cryocooler

    NASA Technical Reports Server (NTRS)

    Dolan, F. X.; McCormick, J. A.; Nellis, G. F.; Sixsmith, H.; Swift, W. L.

    1999-01-01

    In October 1998 a mechanical cryocooler and cryogenic circulator loop were flown on NASA's STS-95 as part of the Hubble Orbital System Test (HOST). The system will be installed on the Hubble Space Telescope (HST) during Service Mission #3 in 2000 and will provide cooling to the Near Infrared Camera and Multi-Object Spectrometer (NICMOS). It will extend the useful life of that instrument by 5 to 10 years. This was the first successful space demonstration of a turbobrayton cryocooler. The cooler is a single stage reverse Brayton type, using low-vibration high-speed miniature turbomachines for the compression and expansion functions. A miniature centrifugal cryogenic circulator is used to deliver refrigerated neon to the instrument. During the mission, the cooler operated without anomalies for approximately 185 hours over a range of conditions to verify its mechanical, thermodynamic and control functions. The cryocooler satisfied all mission objectives including maximum cooldown to near-design operating conditions, warm and cold starts and stops, operation at near-design temperatures, and demonstration of long-term temperature stability. This paper presents a description of the cooler and its operation during the HOST flight.

  3. Acceptability of self-conducted home-based HIV testing among men who have sex with men in Brazil: data from an on-line survey

    PubMed Central

    Lippman, Sheri A.; Périssé, André R. S.; Veloso, Valdiléa G.; Sullivan, Patrick S.; Buchbinder, Susan; Sineath, R. Craig; Grinsztejn, Beatriz

    2014-01-01

    The Brazilian HIV/AIDS epidemic is concentrated among men who have sex with men (MSM), however HIV testing rates among MSM are not commensurate with their risk. Strategies to expand early diagnosis may include use of self-conducted home-based testing kits, which are now available for purchase in the US. In April 2011 we conducted a survey with Brazilian MSM using Facebook to assess HIV testing preferences and acceptability of home-based testing. Among 356 previously tested, HIV-negative MSM, 47% reported a preference for home-based testing, 27% preferred clinic-based testing, and 26% had no preference. Less frequent testers and those who had considered testing but failed to test were more likely to prefer home-based testing. Close to 90% reported that they would use self-test kits; 62% and 54% said they would use home-based testing to make choices about unprotected sex with regular and new partners, respectively. Concerns included difficulty to understand the tests (32%) and receiving results alone (23%). Overall, home-based testing may appeal to MSM and result in increased testing frequency. Research on feasibility and utilization of self-tests in practice is needed. PMID:24896048

  4. Using Phased Array Ultrasonic Testing in Lieu of Radiography for Acceptance of Carbon Steel Piping Welds

    SciTech Connect

    Moran, Traci L.; Anderson, Michael T.; Cinson, Anthony D.; Crawford, Susan L.; Nove, Carol A.

    2014-08-01

    The Pacific Northwest National Laboratory (PNNL) is conducting studies for the U.S. Nuclear Regulatory Commission (NRC) to assess the capability, effectiveness, and reliability of ultrasonic testing (UT) as a replacement method for radiographic testing (RT) for volumetric examination of nuclear power plant (NPP) components. This particular study focused on evaluating the use of UT on carbon steel plate welds. Welding fabrication flaws included a combination of planar and volumetric types, e.g., incomplete fusion, lack of penetration, cracks, porosity, and slag inclusions. The examinations were conducted using phased-array (PA) UT techniques applied primarily for detection and flaw type characterization. This paper will discuss the results of using UT in lieu of RT for detection and classification of fabrication flaws in carbon steel plate welds.

  5. Shashlik calorimeter Beam-test results

    NASA Astrophysics Data System (ADS)

    Badier, J.; Busson, Ph.; Charlot, C.; Dobrzynski, L.; Tanaka, R.; Bordalo, P.; Ramos, S.; Bityukov, S.; Obraztsov, V.; Ostankov, A.; Zaitchenko, A.; Gninenko, S.; Guschin, E.; Issakov, V.; Mussienko, Y.; Semenjuk, I.

    1994-08-01

    Results from an extensive study of nonprojective Shashlik calorimeter prototypes are reported. Nine (47 × 47 mm 2) towers were exposed to a high energy electron beam at CERN SPS and read out by silicon photodiodes followed by low noise preamplifiers. The main results are the measurements of the energy and shower position resolution and the angular resolution of the electron shower direction. The shower direction measurement is encouraging being in agreement at the tower center with a resolution of σθ(mrad) = 70/√ E (10 mrad for 50 GeV electrons). The uniformity of the calorimeter response is found to be better than ± 1%. The mean light yield measured in Shashlik towers equipped with Kuraray Y7 WLS fibres and aluminized at the front end of the tower is of the order of 13 photons/MeV.

  6. Test results of a prototype dielectric microcalorimeter

    NASA Technical Reports Server (NTRS)

    Pfafman, T. E.; Silver, E.; Labov, S.; Beeman, J.; Goulding, F.; Hansen, W.; Landis, D.; Madden, N.

    1990-01-01

    The initial development work on a dielectric microcalorimeter is presented. It focuses on the dielectric properties of the ferroelectric material KTa(1-x)Nb(x)O3 (KTN). Measurements of the temperature dependent dielectric constant are given together with the first alpha particle detection results from a prototype composite microcalorimeter operating at 1.3 K. A nonthermal mechanism for detecting 6 MeV alpha particles in a monolithic KTN sample is also reported.

  7. Test results of a prototype dielectric microcalorimeter

    SciTech Connect

    Pfafman, T.E.; Silver, E.; Labov, S. ); Beeman, J.; Goulding, F.; Hansen, W.; Landis, D.; Madden, N. )

    1990-08-13

    The initial development work on a dielectric microcalorimeter is presented. It focuses on the dielectric properties of the ferroelectric material KTa{sub 1-x}Nb{sub x}O{sub 3} (KTN). Measurements of the temperature dependent dielectric constant are given together with the first alpha particle detection results from a prototype composite microcalorimeter operating at 1.3 K. a non-thermal mechanism for detecting 6 MeV alpha particles in a monolithic KTN sample is also reported. 7 refs, 16 figs., 1 tab.

  8. Healing Our Women for Transgender Women: Adaptation, Acceptability, and Pilot Testing.

    PubMed

    Collier, Kate L; Colarossi, Lisa G; Hazel, Daphne S; Watson, Kim; Wyatt, Gail E

    2015-10-01

    Healing Our Women (HOW) is a group-level HIV risk-reduction intervention developed to address the role of prior sexual victimization in HIV risk and protective behaviors among HIV-positive women of color. This article describes the process of adapting HOW for transgender women of color in New York City in accordance with CDC guidance for the adaptation of efficacious interventions. Twenty-one transgender women were enrolled in a study to evaluate the acceptability and fidelity of the adapted intervention, and to assess HIV knowledge, depressive symptoms, coping, condom use self-efficacy, and condom use via pre- and post-intervention surveys. We found the adapted program to be feasible to implement and acceptable to participants. We also found significant decreases in depressive symptoms and increases in positive coping from pre- to post-intervention, although replication with a larger sample and a control group comparison is needed to determine efficacy with this population. PMID:26485232

  9. Life cycle test results of a bipolar nickel hydrogen battery

    NASA Technical Reports Server (NTRS)

    Cataldo, R. L.

    1985-01-01

    A history of low earth orbit laboratory test data on a 6.5 Ah bipolar nickel hydrogen battery designed and built at the NASA Lewis Research Center is presented. During the past several years the storage and Thermal Branch has been deeply involved in the design, development, and optimization of nickel hydrogen devices. The bipolar concept is a means of achieving the goal of producing an acceptable battery of higher energy density, able to withstand the demands of low earth orbiter regimes.

  10. Life cycle test results of a bipolar nickel hydrogen battery

    NASA Technical Reports Server (NTRS)

    Cataldo, R. L.

    1985-01-01

    A history of low Earth orbit laboratory test data on a 6.5 Ah bipolar nickel hydrogen battery designed and built at the NASA Lewis Research Center is presented. During the past several years the Storage and Thermal Branch has been deeply involved in the design, development, and optimization of nickel hydrogen devices. The bipolar concept is a means of achieving the goal of producing an acceptable battery of higher energy density, able to withstand the demands of low Earth orbit regimes.

  11. Acceptance Testing of a Satellite SCADA Photovoltaic-Diesel Hybrid System

    NASA Technical Reports Server (NTRS)

    Kalu, A.; Emrich, C.; Ventre, G.; Wilson, W.; Acosta, Roberto (Technical Monitor)

    2000-01-01

    Satellite Supervisory Control and Data Acquisition (SCADA) of a Photovoltaic (PV)/diesel hybrid system was tested using NASA's Advanced Communication Technology Satellite (ACTS) and Ultra Small Aperture Terminal (USAT) ground stations. The setup consisted of a custom-designed PV/diesel hybrid system, located at the Florida Solar Energy Center (FSEC), which was controlled and monitored at a "remote" hub via Ka-band satellite link connecting two 1/4 Watt USATs in a SCADA arrangement. The robustness of the communications link was tested for remote monitoring of the health and performance of a PV/diesel hybrid system, and for investigating load control and battery charging strategies to maximize battery capacity and lifetime, and minimize loss of critical load probability. Baseline hardware performance test results demonstrated that continuous two-second data transfers can be accomplished under clear sky conditions with an error rate of less than 1%. The delay introduced by the satellite (1/4 sec) was transparent to synchronization of satellite modem as well as to the PV/diesel-hybrid computer. End-to-end communications link recovery times were less than 36 seconds for loss of power and less than one second for loss of link. The system recovered by resuming operation without any manual intervention, which is important since the 4 dB margin is not sufficient to prevent loss of the satellite link during moderate to heavy rain. Hybrid operations during loss of communications link continued seamlessly but real-time monitoring was interrupted. For this sub-tropical region, the estimated amount of time that the signal fade will exceed the 4 dB margin is about 10%. These results suggest that data rates of 4800 bps and a link margin of 4 dB with a 1/4 Watt transmitter are sufficient for end-to-end operation in this SCADA application.

  12. SLURRY MIX EVAPORATOR BATCH ACCEPTABILITY AND TEST CASES OF THE PRODUCT COMPOSITION CONTROL SYSTEM WITH THORIUM AS A REPORTABLE ELEMENT

    SciTech Connect

    Edwards, T.

    2010-10-07

    requested to conduct. SRNL issued a Task Technical and Quality Assurance (TT&QA) plan [4] in response to the SRR request. The conclusions provided in this report are that no changes need to be made to the SME acceptability process (i.e., no modifications to WSRC-TR-95-00364, Revision 5, are needed) and no changes need to be made to the Product Composition Control System (PCCS) itself (i.e. the spreadsheet utilized by Waste Solidification Engineering (WSE) for acceptability decisions does not require modification) in response to thorium becoming a reportable element for DWPF operations. In addition, the inputs and results for the two test cases requested by WSE for use in confirming the successful activation of thorium as a reportable element for DWPF operations during the processing of SB6 are presented in this report.

  13. International Space Station Environmental Control and Life Support System Acceptance Testing for Node 1 Temperature and Humidity Control Subsystem

    NASA Technical Reports Server (NTRS)

    Williams, David E.

    2011-01-01

    The International Space Station (ISS) Node 1 Environmental Control and Life Support (ECLS) System is comprised of five subsystems: Atmosphere Control and Storage (ACS), Atmosphere Revitalization (AR), Fire Detection and Suppression (FDS), Temperature and Humidity Control (THC), and Water Recovery and Management (WRM). This paper will provide a summary of the Node 1 ECLS THC subsystem design and a detailed discussion of the ISS ECLS Acceptance Testing methodology utilized for this subsystem.The International Space Station (ISS) Node 1 Environmental Control and Life Support (ECLS) System is comprised of five subsystems: Atmosphere Control and Storage (ACS), Atmosphere Revitalization (AR), Fire Detection and Suppression (FDS), Temperature and Humidity Control (THC), and Water Recovery and Management (WRM). This paper will provide a summary of the Node 1 ECLS THC subsystem design and a detailed discussion of the ISS ECLS Acceptance Testing methodology utilized for this subsystem.

  14. Feasibility and Acceptability of an Early Childhood Obesity Prevention Intervention: Results from the Healthy Homes, Healthy Families Pilot Study

    PubMed Central

    Gorham, Gemma

    2014-01-01

    Background. This study examined the feasibility and acceptability of a home-based early childhood obesity prevention intervention designed to empower low-income racially/ethnically diverse parents to modify their children's health behaviors. Methods. We used a prospective design with pre-/posttest evaluation of 50 parent-child pairs (children aged 2 to 5 years) to examine potential changes in dietary, physical activity, and sedentary behaviors among children at baseline and four-month follow-up. Results. 39 (78%) parent-child pairs completed evaluation data at 4-month follow-up. Vegetable intake among children significantly increased at follow-up (0.54 cups at 4 months compared to 0.28 cups at baseline, P = 0.001) and ounces of fruit juice decreased at follow-up (11.9 ounces at 4 months compared to 16.0 ounces at baseline, P = 0.036). Sedentary behaviors also improved. Children significantly decreased time spent watching TV on weekdays (P < 0.01) and also reduced weekend TV time. In addition, the number of homes with TV sets in the child's bedroom also decreased (P < 0.0013). Conclusions. The findings indicate that a home-based early childhood obesity prevention intervention is feasible, acceptable and demonstrates short-term effects on dietary and sedentary behaviors of low-income racially/ethnically diverse children. PMID:25405026

  15. Human Factors Process Task Analysis: Liquid Oxygen Pump Acceptance Test Procedure at the Advanced Technology Development Center

    NASA Technical Reports Server (NTRS)

    Diorio, Kimberly A.; Voska, Ned (Technical Monitor)

    2002-01-01

    This viewgraph presentation provides information on Human Factors Process Failure Modes and Effects Analysis (HF PFMEA). HF PFMEA includes the following 10 steps: Describe mission; Define System; Identify human-machine; List human actions; Identify potential errors; Identify factors that effect error; Determine likelihood of error; Determine potential effects of errors; Evaluate risk; Generate solutions (manage error). The presentation also describes how this analysis was applied to a liquid oxygen pump acceptance test.

  16. International Space Station Environmental Control and Life Support System Acceptance Testing for Node 1 Atmosphere Control and Supply Subsystem

    NASA Technical Reports Server (NTRS)

    Williams, David E.

    2009-01-01

    The International Space Station (ISS) Node 1 Environmental Control and Life Support (ECLS) System is comprised of five subsystems: Atmosphere Control and Supply (ACS), Atmosphere Revitalization (AR), Fire Detection and Suppression (FDS), Temperature and Humidity Control (THC), and Water Recovery and Management (WRM). This paper provides a summary of the Node 1 ECLS ACS subsystem design and a detailed discussion of the ISS ECLS Acceptance Testing methodology utilized for that subsystem.

  17. Project W-314 updated acceptance test report HNF-4649 for HNF-4648 241-AN-A pit leak detection ANA-WT-LDSTA-331 for project W-314

    SciTech Connect

    HAMMERS, J.S.

    1999-09-30

    The purpose of the test was to verify that the AN Tank Farm AN-A Pit Leak Detector components are functionally integrated and operate in accordance with engineering design specifications. The Acceptance Test Procedure HNF-4648,24l-AN-A-Pit Leak Detection ANA-WT-LDSTA-331 was conducted between 23 June and 01 July 1999 at the 200E AN Tank Farm. The test has been completed with no open test exceptions. The test was conducted prior to final engineering ''as built'' activities being completed this had no impact on the procedure or test results. All components, identified in the procedure were found to be labeled and identified as written in the procedure.

  18. Project W-314 acceptance test report HNF-4647 for HNF-4646 241-B pit leak detection ANB-WT-LDSTA-231 for project W-314

    SciTech Connect

    HAMMERS, J.S.

    1999-09-30

    The purpose of the test was to verify that the AN Tank Farm B Pit Leak Detector components are functionally integrated and operate in accordance with engineering design specifications. The Acceptance Test Procedure HNF-4646,241-AN-B-Pit Leak Detection ANB-WT-LDSTA-231 was conducted between 26 June and 02 July 1999 at the 200E AN Tank Farm. The test has been completed with no open test exceptions. The test was conducted prior to final engineering ''as built'' activities being completed this had no impact on the procedure or test results. All components, identified in the procedure were found to be labeled and identified as written in the procedure.

  19. Acceptance of HIV testing among women attending antenatal care in south-western Uganda: risk factors and reasons for test refusal.

    PubMed

    Dahl, V; Mellhammar, L; Bajunirwe, F; Björkman, P

    2008-07-01

    A problem commonly encountered in programs for prevention of mother-to-child-transmission (PMTCT) of HIV in sub-Saharan Africa is low rates of HIV test acceptance among pregnant women. In this study, we examined risk factors and reasons for HIV test refusal among 432 women attending three antenatal care clinics offering PMTCT in urban and semi-urban parts of the Mbarara district, Uganda. Structured interviews were performed following pre-test counselling. Three-hundred-eighty women were included in the study, 323 (85%) of whom accepted HIV testing. In multivariate analysis, testing site (Site A: OR = 1.0; Site B: OR = 3.08; 95%CI: 1.12-8.46; Site C: OR = 5.93; 95%CI: 2.94-11.98), age between 30 and 34 years (<20 years: OR = 1.0; 20-24 years: OR = 1.81; 95%CI: 0.58-5.67; 25-29 years: OR = 2.15; 95%CI: 0.66-6.97; 30-34 years: OR = 3.88; 95%CI: 1.21-13.41), mistrust in reliability of the HIV test (OR = 20.60; 95%CI: 3.24-131.0) and not having been tested for HIV previously (OR = 2.15; 95%CI: 1.02-4.54) were associated with test refusal. Testing sites operating for longer durations had higher rates of acceptance. The most common reasons claimed for test refusal were: lack of access to antiretroviral therapy (ART) for HIV-infected women (88%; n=57), a need to discuss with partner before decision (82%; n=57) and fear of partner's reaction (54%; n=57). Comparison with previous periods showed that the acceptance rate increased with the duration of the program. Our study identified risk factors for HIV test refusal among pregnant women in Uganda and common reasons for not accepting testing. These findings may suggest modifications and improvements in the performance of HIV testing in this and similar populations. PMID:18576178

  20. Questionnaire design: carry-over effects of overall acceptance question placement and pre-evaluation instructions on overall acceptance scores in central location tests.

    PubMed

    Bastian, Mauresa; Eggett, Dennis L; Jefferies, Laura K

    2015-02-01

    Question placement and usage of pre-evaluation instructions (PEI) in questionnaires for food sensory analysis may bias consumers' scores via carry-over effects. Data from consumer sensory panels previously conducted at a central location, spanning 11 years and covering a broad range of food product categories, were compiled. Overall acceptance (OA) question placement was studied with categories designated as first (the first evaluation question following demographic questions), after nongustation questions (immediately following questions that do not require panelists to taste the product), and later (following all other hedonic and just-about-right [JAR] questions, but occasionally before ranking, open-ended comments, and/or intent to purchase questions). Each panel was categorized as having or not having PEI in the questionnaire; PEI are instructions that appear immediately before the first evaluation question and show panelists all attributes they will evaluate before receiving test samples. Postpanel surveys were administered regarding the self-reported effect of PEI on panelists' evaluation experience. OA scores were analyzed and compared (1) between OA question placement categories and (2) between panels with and without PEI. For most product categories, OA scores tended to be lower when asked later in the questionnaire, suggesting evidence of a carry-over effect. Usage of PEI increased OA scores by 0.10 of a 9-point hedonic scale point, which is not practically significant. Postpanel survey data showed that presence of PEI typically improved the panelists' experience. Using PEI does not appear to introduce a meaningful carry-over effect. PMID:25604650

  1. The regulatory function of self-esteem: testing the epistemic and acceptance signaling systems.

    PubMed

    Stinson, Danu Anthony; Logel, Christine; Holmes, John G; Wood, Joanne V; Forest, Amanda L; Gaucher, Danielle; Fitzsimons, Grainné M; Kath, Jennifer

    2010-12-01

    The authors draw on sociometer theory (e.g., Leary, 2004) and self-verification theory (e.g., Swann, 1997) to propose an expanded model of the regulatory function of self-esteem. The model suggests that people not only possess an acceptance signaling system that indicates whether relational value is high or low but also possess an epistemic signaling system that indicates whether social feedback is consistent or inconsistent with chronic perceived relational value (i.e., global self-esteem). One correlational study and 5 experiments, with diverse operationalizations of social feedback, demonstrated that the epistemic signaling system responds to self-esteem consistent or inconsistent relational-value feedback with increases or deceases in epistemic certainty. Moreover, Studies 3-6 demonstrated that the acceptance and epistemic signaling systems respond uniquely to social feedback. Finally, Studies 5 and 6 provide evidence that the epistemic signaling system is part of a broader self-regulatory system: Self-esteem inconsistent feedback caused cognitive efforts to decrease the discrepancy between self-views and feedback and caused depleted self-regulatory capacity on a subsequent self-control task. PMID:20822286

  2. 14 CFR 135.301 - Crewmember: Tests and checks, grace provisions, training to accepted standards.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... PERSONS ON BOARD SUCH AIRCRAFT Crewmember Testing Requirements § 135.301 Crewmember: Tests and checks... test or check in the calendar month in which it is required. (b) If a pilot being checked under this... the pilot during the course of the check. In addition to repeating the maneuvers failed, the...

  3. Optimizing surface quality of stainless alloys and using a modified ASTM G 48B procedure for acceptance testing

    SciTech Connect

    Maurer, J.R.

    1999-01-01

    The formation of high-temperature oxide scales and Cr-depleted zones on stainless alloys, such as 6% Mo superaustenitic steels, can significantly reduce their corrosion resistance. Effective methods to remove these layers and restore the surface to an optimized condition are detailed. Also, an acceptance test using a modified ASTM G 48B method at 35 C (95 F) for 72 h with a specimen having a crevice, and special corrosion criteria for failure, are described. Comparison of this test method with one using an uncreviced specimen at lower temperatures and for less time is discussed.

  4. Design, fabrication and acceptance testing of a zero gravity whole body shower, volume 1

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The effort to design whole body shower for the space station prototype is reported. Clothes and dish washer/dryer concepts were formulated with consideration given to integrating such a system with the overall shower design. Water recycling methods to effect vehicle weight savings were investigated and it was concluded that reusing wash and/or rinse water resulted in weight savings which were not sufficient to outweigh the added degree of hardware complexity. The formulation of preliminary and final designs for the shower are described. A detailed comparison of the air drag vs. vacuum pickup method was prepared that indicated the air drag concept results in more severe space station weight penalties; therefore, the preliminary system design was based on utilizing the vacuum pickup method. Tests were performed to determine the optimum methods of storing, heating and sterilizing the cleansing agent utilized in the shower; it was concluded that individual packages of pre-sterilized cleansing agent should be used. Integration features with the space station prototype system were defined and incorporated into the shower design as necessary.

  5. Acceptance Testing of a Satellite SCADA Photovoltaic-Diesel Hybrid System

    NASA Technical Reports Server (NTRS)

    Kalu, Alex; Acosta, R.; Durand, S.; Emrich, Carol; Ventre, G.; Wilson, W.

    1999-01-01

    Savannah State University (SSU) and the Florida Solar Energy Center (FSEC) have been participating in the NASA Advanced Communications Technology Satellite (ACTS) program for the last five years. This program was designed by NASA to help maintain U.S. leadership in commercial space communications by funding high-risk research, and to flight-test next-generation digital satellite components. Launched in 1993, ACTS is an U.S. government funded technology test-bed that incorporates high power Ka-band transponders, small spot beams, and on-board digital storage and switching technology. Associated with the spacecraft, is a prototype satellite control center that supports various application experiments. The SSU/FSEC application experiment is to developing a Photovoltaic-Diesel Hybrid Power system complete with satellite Supervisory Control and Data Acquisition (SCADA). The hybrid system was design to demonstrate the feasibility of using SCADA to maintain and operate remote village power systems. This configuration would enable experts at a central location to provide technical assistance to local technicians while they acquire a measure of proficiency with the hybrid system operation and maintenance. Upon full mastery of the technology, similar SCADA arrangement are planned to remotely monitor and control constellation of hybrid systems scattered overlarge rural areas. Two Orion Energy APEX-1000 hybrid systems were delivered in 1998, one was installed at SSU in eastern Georgia and the other was installed at FSEC in Central Florida. The project was designed to: (1) evaluate the performance of ACTS in a SCADA arrangement, (2) monitor the health and performance of all major hybrid subsystems, (3) investigate load control and battery charging strategies to maximize battery capacity and lifetime, and (4) develop satellite communication protocol. Preliminary results indicate that the hybrid design is suitable for satellite Supervisory Control and Data Acquisition. A

  6. Dynamic Docking Test System (DDTS) active table frequency response test results. [Apollo Soyuz Test Project

    NASA Technical Reports Server (NTRS)

    Gates, R. M.

    1974-01-01

    Results are presented of the frequency response test performed on the dynamic docking test system (DDTS) active table. Sinusoidal displacement commands were applied to the table and the dynamic response determined from measured actuator responses and accelerometers mounted to the table and one actuator.

  7. Voluntary STD testing and treatment program at a metropolitan correctional facility: evaluation of test acceptability and associated risk factors.

    PubMed

    Brown, Christopher K; Earley, Mary; Shaikh, Raees; Fickenscher, Jillian; Ott, Jessica; Person, Austin; Islam, K M Monirul; Simonsen, Kari; Sandkovsky, Uriel; Kaiser, Katherine Laux; Foxall, Mark; Margalit, Ruth

    2014-01-01

    Few studies have addressed challenges of diagnosis and treatment of sexually transmitted diseases (STDs) within correctional facilities. Initiatives that screen all inmates can be cost-prohibitive, while symptom-based screening undoubtedly fails to recognize significant numbers of asymptomatically infected persons. This study discusses a voluntary STD screening and treatment program developed at the Douglas County (Nebraska) Department of Corrections where student volunteers interviewed, screened, and educated 456 inmates. Inmate urine samples and interview responses about risk behaviors and motivators for participation in the screening program were analyzed. The results support the ongoing project method to screen and treat inmates in the community correctional facility. Risk factor analysis suggests that targeted testing and treatment efforts may have a role in providing cost-effective care for STD among the incarcerated population. PMID:24352406

  8. Tank Monitor and Control System (TMACS) Rev 11.0 Acceptance Test Review

    SciTech Connect

    HOLM, M.J.

    1999-08-25

    The purpose of this document is to describe tests performed to validate Revision 11 of the TMACS Monitor and Control System (TMACS) and verify that the software functions as intended by design. This document is intended to test the software portion of TMACS. The tests will be performed on the development system. The software to be tested is the TMACS knowledge bases (KB) and the I/O driver/services. The development system will not be talking to field equipment; instead, the field equipment is simulated using emulators or multiplexers in the lab.

  9. Initial test results using the GEOS-3 engineering model altimeter

    NASA Technical Reports Server (NTRS)

    Hayne, G. S.; Clary, J. B.

    1977-01-01

    Data from a series of experimental tests run on the engineering model of the GEOS 3 radar altimeter using the Test and Measurement System (TAMS) designed for preflight testing of the radar altimeter are presented. These tests were conducted as a means of preparing and checking out a detailed test procedure to be used in running similar tests on the GEOS 3 protoflight model altimeter systems. The test procedures and results are also included.

  10. D-0 North End Cap Calorimeter Cold Test Results

    SciTech Connect

    Michael, J.; /Fermilab

    1990-08-02

    The North endcap calorimeter vessel was recieved on July 1, 1990. A cooldown of the pressure vessel with liquid nitrogen was performed on July 10-11 to check the vessel's integrity. With the pressure vessel cold, the insulating vacuum was monitored for leaks. Through out the testing, the insulating vacuum remained good and the vessel passed the test. The cold test was carried out per the procedures of D-Zero engineering note 3740.220-EN-250. The test was very similar to the cold test performed on the Central Calorimeter in October of 1987. Reference D-Zero engineering notes 3740.210-EN-122, 3740.000-EN107, and 3740.210-EN-110 for information about the CC cold test. The insulating vacuum space was pumped on while equipment was being connected to the pressure vessel. Two hours after starting to pump with the blower the vacuum space pressure was at about 210 microns. Pumping on the vacuum space for the next 15 hours showed no progress and a leak detector was connected to the pumping line. A leak check showed a leak in a thermocouple feedthru on the vacuum space relief plate. After fixing the leak, the pressure dropped to 16 microns in less than one hour. A rate of rise test was performed starting at a pressure of 13 microns. The pressure rose to 39 microns within 8 minutes and then only rose to 43 microns in 2.5 hours (1.6 microns/hour). After all connections were made to the pressure vessel, a vacuum pump with an estimated effective pumping speed of about 70 scfm was valved on. The lowest pressure achieved after 2 days of pumping was 80 microns. Valving out the pump for 30 minutes resulted in a 5 micron per minute rate of rise. The rate of rise was considered acceptable since there were known leak paths through the bolts of the signal ports. The EC North vessel was rolled outside of Lab A in preparation for a 5000 gallon liquid nitrogen trailer which arrived July, 10 at 8:00am. Before filling the vessel, the vacuum space pump was valved off. The pressure in the

  11. Acceptability of HIV/AIDS Counseling and Testing among Premarital Couples in China

    ERIC Educational Resources Information Center

    Wu, Zunyou; Rou, Keming; Xu, Chen; Lou, Wei; Detels, Roger

    2005-01-01

    Premarital counseling is required for couples wishing to be married in China. The counseling primarily provides information about contraception. We evaluated adding premarital HIV/AIDS counseling and voluntary HIV testing to the standard counseling. The test was offered free to one group and at the standard cost to the other. The proportion of…

  12. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid P

    SciTech Connect

    KOCH, M.R.

    2000-02-14

    This Test Plan provides a test method to dedicate the leak detection relays used on the new Pumping Instrumentation and Control (PIC) skids. The new skids are fabricated on-site. The leak detection system is a safety class system per the Authorization Basis.

  13. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid Q

    SciTech Connect

    KOCH, M.R.

    2000-02-14

    This Test Plan provides a test method to dedicate the leak detection relays used on the new Pumping Instrumentation and Control (PIC) skids. The new skids are fabricated on-site. The leak detection system is a safety class system per the Authorization Basis.

  14. 49 CFR 180.511 - Acceptable results of inspections and tests.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) Safety system inspection. A tank car successfully passes the safety system inspection when each thermal protection system, tank head puncture resistance system, coupler vertical restraint system, and system...

  15. 12 CFR 325.207 - Publication of stress test results.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 12 Banks and Banking 5 2013-01-01 2013-01-01 false Publication of stress test results. 325.207... GENERAL POLICY CAPITAL MAINTENANCE Annual Stress Test § 325.207 Publication of stress test results. (a... annual stress test in the period starting June 15 and ending June 30. (2) An over $50 billion...

  16. 12 CFR 325.207 - Publication of stress test results.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 12 Banks and Banking 5 2014-01-01 2014-01-01 false Publication of stress test results. 325.207... GENERAL POLICY CAPITAL MAINTENANCE Annual Stress Test § 325.207 Publication of stress test results. (a... annual stress test in the period starting June 15 and ending June 30. (2) An over $50 billion...

  17. Shielding requirements on-site loading and acceptance testing on the Leksell gamma knife.

    PubMed

    Maitz, A H; Lunsford, L D; Wu, A; Lindner, G; Flickinger, J C

    1990-02-01

    On August 14, 1987, the first stereotactic radiosurgical procedure using the gamma knife was performed in North America. Located in a self-contained radiosurgical suite in the basement of Presbyterian-University Hospital in Pittsburgh, Pennsylvania. This device uses 201 highly focused beams 60Co for the single-treatment closed-skull irradiation of brain lesions localized by stereotactic techniques (radiosurgery). One hundred and fifty-two patients with intracranial arteriovenous malformations or brain tumors were treated in the first year of operation. The Presbyterian University Hospital of Pittsburgh gamma knife is the first such unit in which the 60Co sources were loaded on-site. This effort required us to solve some difficult and unusual problems encountered during site preparation, delivery, and loading of the unit in a busy hospital setting. The solutions developed enabled installation and use of the gamma knife with minimal disruption of hospital activities while maintaining acceptable levels of exposure to radiation. Environmental surveys performed during the loading of the 201 radioactive sources (total, 219 TBq) confirmed that on-site loading is possible and practical. Our experience in the design, construction, and implementation of the first North American gamma knife supports the practicality and safety of on-site loading and may be of value in the planning and development of future gamma knife installations. PMID:2406231

  18. TESTING INDOOR AIR PRODUCTS: ONE APPROACH TO DEVELOPING WIDELY ACCEPTED PROTOCOLS

    EPA Science Inventory

    The paper describes an approach to developing widely acce ted products for testing indoor air products. [NOTE: Research Triangle Institute (RTI) is a partner in the U.S. Environmental Protection Agency's (EPA's) Environmental Technology Verification (ETV) Program with responsibil...

  19. Acceptability testing of radioluminescent lights for VFR-night air taxi operations

    SciTech Connect

    Jensen, G.A.

    1985-01-01

    Tritium-powered radioluminescent (RL) lights have been under development for remote, austere, and tactical airfield lighting applications. The State of Alaska has requested FAA approval for use of the technology as a safe alternative lighting system to meet the airfield lighting needs of air taxi operations and general aviation in the state. The tests described in this report were performed by PNL for the DOE Defense Byproducts Production and Utilization Program. These tests are a step toward gaining the required approvals.

  20. Thermocouple module halt failure acceptance test procedure for Tank 241-SY-101 DACS-1

    SciTech Connect

    Ermi, A.M.

    1997-12-09

    The readiness of the Tank 241-SY-101 Data Acquisition and Control System (DACS-1) to provide monitoring and alarms for a halt failure of any thermocouple module will be tested during the performance of this procedure. Updated DACS-1 ``1/0 MODULE HEALTH STATUS``, ``MININ1``, and ``MININ2`` screens, which now provide indication of thermocouple module failure, will also be tested as part of this procedure.

  1. HIV coping self-efficacy: a key to understanding stigma and HIV test acceptance among incarcerated men in Jamaica.

    PubMed

    Andrinopoulos, Katherine; Kerrigan, Deanna; Figueroa, J Peter; Reese, Richard; Ellen, Jonathan M

    2010-03-01

    Although prisons have been noted as important venues for HIV testing, few studies have explored the factors within this context that may influence HIV test acceptance. Moreover, there is a dearth of research related to HIV and incarcerated populations in middle and low-income countries, where both the burden of HIV and the number of people incarcerated is higher compared to high-income countries. This study explores the relationship between HIV coping self-efficacy, HIV-related stigma, and HIV test acceptance in the largest prisons in Jamaica. A random sample of inmates (n=298) recruited from an HIV testing demonstration project were asked to complete a cross-sectional quantitative survey. Participants who reported high HIV coping self-efficacy (adjusted odds ratio (AOR) 1.86: 95% confidence interval CI 1.24-2.78, p-value=0.003), some perceived risk of HIV (AOR 2.51: 95% (CI) 1.57-4.01, p-value=0.000), and low HIV testing stigma (AOR 1.71: 95% CI 1.05-2.79, p-value=0.032) were more likely to test for HIV. Correlates of HIV coping self-efficacy included external and internal HIV stigma (AOR 1.28: 95% CI 1.25-1.32, p-value=0.000 and AOR 1.76: 95% CI 1.34-2.30, p-value=0.000, respectively), social support (AOR 2.09: 95% CI 1.19-3.68, p-value=0.010), and HIV knowledge (AOR 2.33: 95% CI 1.04-5.22, p-value=0.040). Policy and programs should focus on the interrelationships of these constructs to increase participation in HIV testing in prison. PMID:20390514

  2. Rapid HIV Testing Is Highly Acceptable and Preferred among High-Risk Gay And Bisexual Men after Implementation in Sydney Sexual Health Clinics

    PubMed Central

    Conway, Damian P.; Guy, Rebecca; Davies, Stephen C; Couldwell, Deborah L.; McNulty, Anna; Smith, Don E.; Keen, Phillip; Cunningham, Philip; Holt, Martin

    2015-01-01

    Background Rapid HIV testing (RHT) is well established in many countries, but it is new in Australia. We assessed the acceptability of RHT and its associations among gay, bisexual and other men who have sex with men (GBM) after implementation of RHT in Sydney sexual health clinics. Methods GBM were invited to complete an acceptability questionnaire before and after provision of the result of finger-prick blood RHT, comparing their experience of RHT with conventional HIV testing (CHT) involving venipuncture. Logistic regression was used to assess associations between patient characteristics and the preference for RHT over CHT next time they tested for HIV. Results Of 1061 GBM who received non-reactive RHT results, 59% found RHT less stressful than CHT and 34% reported no difference, and 61% found RHT more comfortable than CHT and 26% reported no difference. Nearly all men were satisfied with RHT result delivery (99%) and the RHT process overall (99%). Most men (79%) preferred RHT for their next HIV test and this preference was stronger in men who were aged 35-44 years (adjusted odds ratio [AOR] 2.49, p<0.01), reported they would test more often if RHT was available (AOR 1.66, p=0.01), found returning for results annoying (AOR 1.67, p=0.01), and found RHT less stressful (AOR 2.37, p<0.01) and more comfortable (AOR 1.62, p=0.02) than CHT. Men concerned about the reliability of RHT were less than half as likely to prefer RHT for their next HIV test (AOR 0.44, p<0.01). Conclusions Most GBM preferred RHT to CHT next time and this preference was associated with finding RHT more convenient, more comfortable and less stressful than CHT. These findings suggest that in a clinic setting RHT should be considered to improve the patient experience and may potentially increase uptake and frequency of HIV testing. PMID:25898140

  3. Reporting Test Results to the Public: Exploring the Doughnut.

    ERIC Educational Resources Information Center

    Perlman, Carole L.

    This paper examines some of the issues involved in releasing test results to the press. The first part is based on a survey of National Association of Test Directors members (72 of the 142 members completed a questionnaire on reporting test results to the public). The survey included the following: to whom are results reported; what kind of…

  4. Mathematics Placement Test: Typical Results with Unexpected Outcomes

    ERIC Educational Resources Information Center

    Ingalls, Victoria

    2011-01-01

    Based on the results of a prior case-study analysis of mathematics placement at one university, the mathematics department developed and piloted a mathematics placement test. This article describes the implementation process for a mathematics placement test and further analyzes the test results for the pilot group. As an unexpected result, the…

  5. GOES Type III Loop Heat Pipe Life Test Results

    NASA Technical Reports Server (NTRS)

    Ottenstein, Laura

    2011-01-01

    The GOES Type III Loop Heat Pipe (LHP) was built as a life test unit for the loop heat pipes on the GOES N-Q series satellites. This propylene LHP was built by Dynatherm Corporation in 2000 and tested continuously for approximately 14 months. It was then put into storage for 3 years. Following the storage period, the LHP was tested at Swales Aerospace to verify that the loop performance hadn t changed. Most test results were consistent with earlier results. At the conclusion of testing at Swales, the LHP was transferred to NASA/GSFC for continued periodic testing. The LHP has been set up for testing in the Thermal Lab at GSFC since 2006. A group of tests consisting of start-ups, power cycles, and a heat transport limit test have been performed every six to nine months since March 2006. Tests results have shown no change in the loop performance over the five years of testing. This presentation will discuss the test hardware, test set-up, and tests performed. Test results to be presented include sample plots from individual tests, along with conductance measurements for all tests performed.

  6. Disaster victim investigation recommendations from two simulated mass disaster scenarios utilized for user acceptance testing CODIS 6.0.

    PubMed

    Bradford, Laurie; Heal, Jennifer; Anderson, Jeff; Faragher, Nichole; Duval, Kristin; Lalonde, Sylvain

    2011-08-01

    Members of the National DNA Data Bank (NDDB) of Canada designed and searched two simulated mass disaster (MD) scenarios for User Acceptance Testing (UAT) of the Combined DNA Index System (CODIS) 6.0, developed by the Federal Bureau of Investigation (FBI) and the US Department of Justice. A simulated airplane MD and inland Tsunami MD were designed representing a closed and open environment respectively. An in-house software program was written to randomly generate DNA profiles from a mock Caucasian population database. As part of the UAT, these two MDs were searched separately using CODIS 6.0. The new options available for identity and pedigree searching in addition to the inclusion of mitochondrial DNA (mtDNA) and Y-STR (short tandem repeat) information in CODIS 6.0, led to rapid identification of all victims. A Joint Pedigree Likelihood Ratio (JPLR) was calculated from the pedigree searches and ranks were stored in Rank Manager providing confidence to the user in assigning an Unidentified Human Remain (UHR) to a pedigree tree. Analyses of the results indicated that primary relatives were more useful in Disaster Victim Identification (DVI) compared to secondary or tertiary relatives and that inclusion of mtDNA and/or Y-STR technologies helped to link family units together as shown by the software searches. It is recommended that UHRs have as many informative loci possible to assist with their identification. CODIS 6.0 is a valuable technological tool for rapidly and confidently identifying victims of mass disasters. PMID:20620126

  7. Acceptance testing report of Eductor System to be installed in the 105 K Basins

    SciTech Connect

    Packer, M.J.

    1996-04-25

    The Spent Nuclear Fuel (SNF) Project Engineering Support group cold-tested the Eductor System a 15 horsepower multi-stage centrifugal pump manufactured by the Grunfos Corporation with the housing manufactured and sold with the pump by the Tri-Nuclear Corporation and a 3-inch diameter water jet eductor manufactured by the Fox Valve Corporation. The Eductor System was tested to gather and document information to optimize sludge retrieval operations for use in the 105 K Basins. The cold-testing took place during February 12 through February 29, 1996 in the 305 Cold Test Facility basin located in the 300 area. The pump, utilized in conjunction with the eductor, makes up the core of the Eductor System. The pumping unit consists of a 15 hp stainless steel multi-stage centrifugal Grunfos pump which is seated in a stainless steel fabricated housing. Two baskets or filter elements make up part of the housing on the suction side of the pump. The pump can be used independent of the housing but the housing has two identified purposes. The first use is to stabilize the centrifugal pump and give the pneumatic valves and pump discharge piping a solid platform so the Eductor System can be more easily mobilized within the basin as one unit. The second use for the housing presents the option to utilize the suction-side filters for capturing larger fuel pieces after the smaller fines have been removed.

  8. CID-720 aircraft Langley Research Center preflight hardware tests: Development, flight acceptance and qualification

    NASA Technical Reports Server (NTRS)

    Pride, J. D.

    1986-01-01

    The testing conducted on LaRC-developed hardware for the controlled impact demonstration transport aircraft is discussed. To properly develop flight qualified crash systems, two environments were considered: the aircraft flight environment with the focus on vibration and temperature effects, and the crash environment with the long pulse shock effects. Also with the large quantity of fuel in the wing tanks the possibility of fire was considered to be a threat to data retrieval and thus fire tests were included in the development test process. The aircraft test successfully demonstrated the performance of the LaRC developed heat shields. Good telemetered data (S-band) was received during the impact and slide-out phase, and even after the aircraft came to rest. The two onboard DAS tape recorders were protected from the intense fire and high quality tape data was recovered. The complete photographic system performed as planned throughout the 40.0 sec of film supply. The four photo power distribution pallets remained in good condition and all ten onboard 16 mm high speed (400 frames/sec) cameras produced good film data.

  9. 46 CFR 162.060-12 - Use and acceptance of existing test data.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... requirements under 46 CFR 159.010-3 and 159.010-5(a) at the time of such work. It is the responsibility of the..., CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ENGINEERING EQUIPMENT Ballast Water Management Systems... system (BWMS) has completed approval testing for a foreign administration in accordance with...

  10. 46 CFR 162.060-12 - Use and acceptance of existing test data.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... requirements under 46 CFR 159.010-3 and 159.010-5(a) at the time of such work. It is the responsibility of the..., CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ENGINEERING EQUIPMENT Ballast Water Management Systems... system (BWMS) has completed approval testing for a foreign administration in accordance with...

  11. 241-AN-A pit leak detection ANA-WT-LDSTA-331 acceptance test procedure

    SciTech Connect

    VANDYKE, D.W.

    1999-08-25

    This document describes the method used to test design criteria for Safety Class, Intrinsically Safe leak detector system installed in 241-AN-A Valve Pit located at 200E Tank Farms. The purpose of this Procedure is to demonstrate that the pit leak detection relay cabinet and intrinsically safe probe circuit is fully operable.

  12. SN-268 encasement leak detection ANA-WT-LDSTA-335 acceptance test procedure

    SciTech Connect

    VANDYKE, D.W.

    1999-08-25

    This document describes the method used to test design criteria for encasement leak detector system installed in 241-AN-A Encasement Line SN-268, located at 200E Tank Farms. This procedure provides instructions for demonstrating that the pit leak detection relay cabinet and intrinsically safe probe circuit is fully operable.

  13. 241-AN-B pit leak detection ANA-WT-LDSTA-231 acceptance test procedure

    SciTech Connect

    VANDYKE, D.W.

    1999-08-25

    This document describes the method used to test design criteria for Safety Class, Intrinsically Safe leak detector system installed in 241-AN-B Valve Pit located at 200E Tank Farms. The purpose of this Procedure is to demonstrate that the pit leak detection relay cabinet and intrinsically safe probe circuit is fully operable.

  14. CENRTC Project No. 2F3EOA, OCB A-372, acceptance test procedure

    SciTech Connect

    Akerson, A.W.

    1995-01-01

    This test procedure provides the steps necessary to verify correct functional operation of controls, annunciators, alarms, protective relays and related systems impacted by CENRTC No. 2F3EOA, Microwave Transfer Trip Project, modification work performed under work package 6B-93-00038/M (CENRTC 2F3EOA MWTT OCB A-372 PACKAGE).

  15. A Nuclear Interaction Model for Understanding Results of Single Event Testing with High Energy Protons

    NASA Technical Reports Server (NTRS)

    Culpepper, William X.; ONeill, Pat; Nicholson, Leonard L.

    2000-01-01

    An internuclear cascade and evaporation model has been adapted to estimate the LET spectrum generated during testing with 200 MeV protons. The model-generated heavy ion LET spectrum is compared to the heavy ion LET spectrum seen on orbit. This comparison is the basis for predicting single event failure rates from heavy ions using results from a single proton test. Of equal importance, this spectra comparison also establishes an estimate of the risk of encountering a failure mode on orbit that was not detected during proton testing. Verification of the general results of the model is presented based on experiments, individual part test results, and flight data. Acceptance of this model and its estimate of remaining risk opens the hardware verification philosophy to the consideration of radiation testing with high energy protons at the board and box level instead of the more standard method of individual part testing with low energy heavy ions.

  16. Effects of Testing Conditions on Conceptual Survey Results

    ERIC Educational Resources Information Center

    Ding, Lin; Reay, Neville W.; Lee, Albert; Bao, Lei

    2008-01-01

    Pre-testing and post-testing is a commonly used method in Physics Education Research to assess student learning gains. It is well recognized in the community that timings and incentives in delivering conceptual tests can impact test results. However, it is difficult to control these variables across different studies. As a common practice, a…

  17. Parental acceptance and illegal drug use among gay, lesbian, and bisexual adolescents: results from a national survey.

    PubMed

    Padilla, Yolanda C; Crisp, Catherine; Rew, Donna Lynn

    2010-07-01

    Although gay, lesbian, and bisexual (GLB) adolescents face many of the same developmental challenges as do heterosexual adolescents, they must also deal with the stress of being part of a stigmatized group. The purpose of this study was to examine the extent to which family support and involvement with the queer community may buffer the effects of life stress on substance use among GLB youths. Drawing on a large national online survey, the authors examined drug use in 1906 GLB youths 12 to 17 years of age. Overall, 20 percent of the youths reported using illegal substances in the past 30 days. Results from multivariate analyses revealed that stress, as measured by suicidal ideation, significantly increased the risk of drug use. A positive reaction from the mother to the youth's coming out served as a significant protective factor, whereas involvement in a queer youth group had no effect. The authors found evidence that, for GLB adolescents, parental acceptance of sexual identity is an important aspect of a strong family relationship and, thus, has important ramifications for their healthy development. Implications of the findings for social work practice are discussed. PMID:20632661

  18. Review of the Aerodynamic Acceptance Test and Application to Anti-Icing Fluids Testing in the NRC Propulsion and Icing Wind Tunnel

    NASA Technical Reports Server (NTRS)

    Broeren, Andy P.; Riley, James T.

    2012-01-01

    In recent years, the FAA has worked with Transport Canada, National Research Council of Canada (NRC) and APS Aviation, Inc. to develop allowance times for aircraft operations in ice-pellet precipitation. These allowance times are critical to ensure safety and efficient operation of commercial and cargo flights. Wind-tunnel testing with uncontaminated anti-icing fluids and fluids contaminated with simulated ice-pellets had been carried out at the NRC Propulsion and Icing Wind Tunnel (PIWT) to better understand the flowoff characteristics and resulting aerodynamic effects. The percent lift loss on the thin, high-performance wing model tested in the PIWT was determined at 8 angle of attack and used as one of the evaluation criteria in determining the allowance times. Because it was unclear as to how performance degradations measured on this model were relevant to an actual airplane configuration, some means of interpreting the wing model lift loss was deemed necessary. In this report, the lift loss was related to the loss in maximum lift of a Boeing 737-200ADV airplane through the Aerodynamic Acceptance Test (AAT) performed for fluids qualification. This report provides a review of the research basis of the AAT in order to understand how this correlation was applied. A loss in maximum lift coefficient of 5.24 percent on the B737-200ADV airplane (which was adopted as the threshold in the AAT) corresponds to a lift loss of 7.3 percent on the PIWT model at 8 degrees angle of attack. There is significant scatter in the data used to develop the correlation related to varying effects of the various antiicing fluids that were tested and other factors. A statistical analysis indicated the upper limit of lift loss on the PIWT model was 9.2 percent. Therefore, for cases resulting in PIWT model lift loss from 7.3 to 9.2 percent, extra scrutiny of the visual observations is required in evaluating fluid performance with contamination. Additional research may result in future

  19. Design, fabrication and acceptance testing of a zero gravity whole body shower

    NASA Technical Reports Server (NTRS)

    Schumacher, E. A.; Lenda, J. A.

    1974-01-01

    Recent research and development programs have established the ability of the zero gravity whole body shower to maintain a comfortable environment in which the crewman can safely cleanse and dry the body. The purpose of this program was to further advance the technology of whole body bathing and to demonstrate technological readiness including in-flight maintenance by component replacement for flight applications. Three task efforts of this program are discussed. Conceptual designs and system tradeoffs were accomplished in task 1. Task 2 involved the formulation of preliminary and final designs for the shower, while task 3 included the fabrication and test of the shower assembly. Particular attention is paid to the evaluation and correction of test anomalies during the final phase of the program.

  20. 105KE Basin Area Radiation Monitor System (ARMS) Acceptance Test Procedure

    SciTech Connect

    KINKEL, C.C.

    1999-12-14

    This procedure is intended for the Area Radiation Monitoring System, ARMS, that is replacing the existing Programmable Input-Output Processing System, PIOPS, radiation monitoring system in the 105KE basin. The new system will be referred to as the 105KE ARMS, 105KE Area Radiation Monitoring System. This ATP will ensure calibration integrity of the 105KE radiation detector loops. Also, this ATP will test and document the display, printing, alarm output, alarm acknowledgement, upscale check, and security functions. This ATP test is to be performed after completion of the 105KE ARMS installation. The alarm outputs of the 105KE ARMS will be connected to the basin detector alarms, basin annunciator system, and security Alarm Monitoring System, AMS, located in the 200 area Central Alarm Station (CAS).