Science.gov

Sample records for acceptance testing plan

  1. Acceptance Test Plan.

    DTIC Science & Technology

    2014-09-26

    7 RD-Ai507 154 CCEPTANCE TEST PLN(U) WESTINGHOUSE DEFENSE ND i/i ELECTRO ICS CENTER BALTIMORE MD DEVELOPMENT AND OPERATIONS DIY D C KRRiJS 28 JUN...Ln ACCEPTANCE TEST PLAN FOR SPECIAL RELIABILITY TESTS FOR BROADBAND MICROWAVE AMPLIFIER PANEL David C. Kraus, Reliability Engineer WESTINGHOUSE ...ORGANIZATION b. OFFICE SYMBOL 7g& NAME OF MONITORING ORGANIZATION tIf appdeg ble) WESTINGHOUSE ELECTRIC CORP. - NAVAL RESEARCH LABORATORY e. AOORES$ (Ci7t

  2. Acceptance Test Plan for ANSYS Software

    SciTech Connect

    CREA, B.A.

    2000-10-25

    This plan governs the acceptance testing of the ANSYS software (Full Mechanical Release 5.5) for use on Project Word Management Contract (PHMC) computer systems (either UNIX or Microsoft Windows/NT). There are two phases to the acceptance testing covered by this test plan: program execution in accordance with the guidance provided in installation manuals; and ensuring results of the execution are consistent with the expected physical behavior of the system being modeled.

  3. Emperical Tests of Acceptance Sampling Plans

    NASA Technical Reports Server (NTRS)

    White, K. Preston, Jr.; Johnson, Kenneth L.

    2012-01-01

    Acceptance sampling is a quality control procedure applied as an alternative to 100% inspection. A random sample of items is drawn from a lot to determine the fraction of items which have a required quality characteristic. Both the number of items to be inspected and the criterion for determining conformance of the lot to the requirement are given by an appropriate sampling plan with specified risks of Type I and Type II sampling errors. In this paper, we present the results of empirical tests of the accuracy of selected sampling plans reported in the literature. These plans are for measureable quality characteristics which are known have either binomial, exponential, normal, gamma, Weibull, inverse Gaussian, or Poisson distributions. In the main, results support the accepted wisdom that variables acceptance plans are superior to attributes (binomial) acceptance plans, in the sense that these provide comparable protection against risks at reduced sampling cost. For the Gaussian and Weibull plans, however, there are ranges of the shape parameters for which the required sample sizes are in fact larger than the corresponding attributes plans, dramatically so for instances of large skew. Tests further confirm that the published inverse-Gaussian (IG) plan is flawed, as reported by White and Johnson (2011).

  4. Acceptance Test Plan for the Sludge Pickup Adaptor

    SciTech Connect

    PITNER, A.L.

    2000-03-29

    This test plan documents the acceptance testing of the sludge pickup adapter for potential use during PSI Phases 3 and 4 fuel cleanliness inspection activities. The adaptex is attached to the strainer tip of the vacuum wand and used to suction up residual sludge captured in a sludge collection tray. The material is vacuumed into a chamber of known volume in the sludge pickup adapter. The device serves as an aid in helping to determine whether the observed quantity of sludge is within allowable limits (1.4 cm{sup 3} per fuel assembly). This functionality test involves underwater testing in the 305 Building Cold Test Facility to verify that sludge can be successfully vacuumed from a collection tray. Ancillary activities in this acceptance test include demonstration that the sludge pickup adapter CM be successfully attached to and detached from the vacuum wand underwater.

  5. Acceptance test plan for the Waste Information Control System

    SciTech Connect

    Flynn, D.F.

    1994-09-14

    This document describes the acceptance test plan for the WICS system. The Westinghouse Hanford Company (WHC) Hazardous Material Control Group (HMC) of the 222-S Laboratory has requested the development of a system to help resolve many of the difficulties associated with tracking and data collection of containers and drums of waste. This system has been identified as Waste Information and Control System (WICS). The request for developing and implementing WICS has been made to the Automation and Simulation Engineering Group (ASE).

  6. General Mission Analysis Tool (GMAT) Acceptance Test Plan [Draft

    NASA Technical Reports Server (NTRS)

    Dove, Edwin; Hughes, Steve

    2007-01-01

    The information presented in this Acceptance Test Plan document shows the current status of the General Mission Analysis Tool (GMAT). GMAT is a software system developed by NASA Goddard Space Flight Center (GSFC) in collaboration with the private sector. The GMAT development team continuously performs acceptance tests in order to verify that the software continues to operate properly after updates are made. The GMAT Development team consists of NASA/GSFC Code 583 software developers, NASA/GSFC Code 595 analysts, and contractors of varying professions. GMAT was developed to provide a development approach that maintains involvement from the private sector and academia, encourages collaborative funding from multiple government agencies and the private sector, and promotes the transfer of technology from government funded research to the private sector. GMAT contains many capabilities, such as integrated formation flying modeling and MATLAB compatibility. The propagation capabilities in GMAT allow for fully coupled dynamics modeling of multiple spacecraft, in any flight regime. Other capabilities in GMAT inclucle: user definable coordinate systems, 3-D graphics in any coordinate system GMAT can calculate, 2-D plots, branch commands, solvers, optimizers, GMAT functions, planetary ephemeris sources including DE405, DE200, SLP and analytic models, script events, impulsive and finite maneuver models, and many more. GMAT runs on Windows, Mac, and Linux platforms. Both the Graphical User Interface (GUI) and the GMAT engine were built and tested on all of the mentioned platforms. GMAT was designed for intuitive use from both the GUI and with an importable script language similar to that of MATLAB.

  7. 49 CFR 232.505 - Pre-revenue service acceptance testing plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... acceptance tests; (3) Correct any safety deficiencies identified by FRA in the design of the equipment or in... measure or determine the success or failure of the tests. If acceptance is to be based on extrapolation of... 49 Transportation 4 2010-10-01 2010-10-01 false Pre-revenue service acceptance testing plan....

  8. 49 CFR 232.505 - Pre-revenue service acceptance testing plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... acceptance tests; (3) Correct any safety deficiencies identified by FRA in the design of the equipment or in... measure or determine the success or failure of the tests. If acceptance is to be based on extrapolation of... 49 Transportation 4 2011-10-01 2011-10-01 false Pre-revenue service acceptance testing plan....

  9. LIMS user acceptance testing.

    PubMed

    Klein, Corbett S

    2003-01-01

    Laboratory Information Management Systems (LIMS) play a key role in the pharmaceutical industry. Thorough and accurate validation of such systems is critical and is a regulatory requirement. LIMS user acceptance testing is one aspect of this testing and enables the user to make a decision to accept or reject implementation of the system. This paper discusses key elements in facilitating the development and execution of a LIMS User Acceptance Test Plan (UATP).

  10. Acceptance testing for battery-electric bus procurements: Planning, inspection, and testing guidelines. Final report

    SciTech Connect

    1998-05-01

    This Acceptance Test Plan (ATP) is intended to guide the inspection and testing of the bus(es) fabricated by Contractor for Buyer in accordance with the contract(s) dated MM, DD, YYYY, and the subsequent change orders and contract modifications. The inspection worksheets and report forms presented in the Appendix are intended to assist in documentation of the inspection process and its findings. Alternatively, existing Contractor worksheets and reports may be used if it can be demonstrated that all relevant technical criteria are encompassed therein. This ATP is intended solely as a guide for the inspection and testing of the bus(es), their associated service, operating, training, and maintenance manuals, mechanical and electrical schematics, software and interfaces, and the special tools delivered in accordance with the technical specifications of the contract(s) cited above. Determination of the Contractor`s compliance with contractual provisions other than those of the technical specifications is beyond the scope of this ATP. Furthermore, this ATP is not intended to determine compliance of Contractor`s Bid Package with requirements of the bid solicitation, nor is it intended to be used in activities associated with the Design Review specified in the contractual documents.

  11. Resolve! Version 2.5: Flammable Gas Accident Analysis Tool Acceptance Test Plan and Test Results

    SciTech Connect

    LAVENDER, J.C.

    2000-10-17

    RESOLVE! Version 2 .5 is designed to quantify the risk and uncertainty of combustion accidents in double-shell tanks (DSTs) and single-shell tanks (SSTs). The purpose of the acceptance testing is to ensure that all of the options and features of the computer code run; to verify that the calculated results are consistent with each other; and to evaluate the effects of the changes to the parameter values on the frequency and consequence trends associated with flammable gas deflagrations or detonations.

  12. W-026 acceptance test plan plant control system software (submittal {number_sign} 216)

    SciTech Connect

    Watson, T.L., Fluor Daniel Hanford

    1997-02-14

    Acceptance Testing of the WRAP 1 Plant Control System software will be conducted throughout the construction of WRAP 1 with final testing on the glovebox software being completed in December 1996. The software tests will be broken out into five sections; one for each of the four Local Control Units and one for the supervisory software modules. The acceptance test report will contain completed copies of the software tests along with the applicable test log and completed Exception Test Reports.

  13. W-026 acceptance test plan plant control system hardware (submittal {number_sign} 216)

    SciTech Connect

    Watson, T.L., Fluor Daniel Hanford

    1997-02-14

    Acceptance Testing of the WRAP 1 Plant Control System Hardware will be conducted throughout the construction of WRAP I with the final testing on the Process Area hardware being completed in November 1996. The hardware tests will be broken out by the following functional areas; Local Control Units, Operator Control Stations in the WRAP Control Room, DMS Server, PCS Server, Operator Interface Units, printers, DNS terminals, WRAP Local Area Network/Communications, and bar code equipment. This document will contain completed copies of each of the hardware tests along with the applicable test logs and completed test exception reports.

  14. UGV acceptance testing

    NASA Astrophysics Data System (ADS)

    Kramer, Jeffrey A.; Murphy, Robin R.

    2006-05-01

    With over 100 models of unmanned vehicles now available for military and civilian safety, security or rescue applications, it is important to for agencies to establish acceptance testing. However, there appears to be no general guidelines for what constitutes a reasonable acceptance test. This paper describes i) a preliminary method for acceptance testing by a customer of the mechanical and electrical components of an unmanned ground vehicle system, ii) how it has been applied to a man-packable micro-robot, and iii) discusses the value of testing both to ensure that the customer has a workable system and to improve design. The test method automated the operation of the robot to repeatedly exercise all aspects and combinations of components on the robot for 6 hours. The acceptance testing process uncovered many failures consistent with those shown to occur in the field, showing that testing by the user does predict failures. The process also demonstrated that the testing by the manufacturer can provide important design data that can be used to identify, diagnose, and prevent long-term problems. Also, the structured testing environment showed that sensor systems can be used to predict errors and changes in performance, as well as uncovering unmodeled behavior in subsystems.

  15. Independent Verification and Validation Of SAPHIRE 8 Software Acceptance Test Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect

    Kent Norris

    2010-03-01

    The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE 8 Software Acceptance Test Plan is to assess the approach to be taken for intended testing activities. The plan typically identifies the items to be tested, the requirements being tested, the testing to be performed, test schedules, personnel requirements, reporting requirements, evaluation criteria, and any risks requiring contingency planning. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production.

  16. Test plan :

    SciTech Connect

    Dwyer, Stephen F.

    2013-05-01

    This test plan is a document that provides a systematic approach to the planned testing of rooftop structures to determine their actual load carrying capacity. This document identifies typical tests to be performed, the responsible parties for testing, the general feature of the tests, the testing approach, test deliverables, testing schedule, monitoring requirements, and environmental and safety compliance.

  17. Cone penetrometer acceptance test report

    SciTech Connect

    Boechler, G.N.

    1996-09-19

    This Acceptance Test Report (ATR) documents the results of acceptance test procedure WHC-SD-WM-ATR-151. Included in this report is a summary of the tests, the results and issues, the signature and sign- off ATP pages, and a summarized table of the specification vs. ATP section that satisfied the specification.

  18. PACS component testing: beta and acceptance testing

    NASA Astrophysics Data System (ADS)

    Honeyman-Buck, Janice C.; Frost, Meryll M.; Staab, Edward V.

    1997-05-01

    The functionality and performance expectations of all PACS components must be specified at the time of purchase and tested completely upon delivery to assure customer satisfaction and successful adoption of the new technology. This process may be more elaborate if the customer agrees to serve as a Beta test site for a new component or a new revision of an existing component.A carefully designed test plan will save time at installation, will allow the customer and vendor to agree on expectations, and will assure that the installation will proceed as planned. This paper describes the test procedure used at the University of Florida to accept each PACS component, either a commercial product, or one developed in house. A set of documents contain descriptions of the pre-installation environment, sets of studies to be used in the test, installation checklist, functional usage reports, subjective evaluations, and problem reporting forms. Training and user documentation is also reviewed and 'help lists' are created to help users perform the most common functions. Although details in the documents are changed to match the type of component being tested, the general form of the test remains the same. A formal procedure for testing the functionality and performance of new equipment can save time for both the vendor and the customer and, if specified at the time of purchase, can serve to document the expectations of the customer. Following these procedures will assure a successful installation and improve customer satisfaction.

  19. L-286 Acceptance Test Record

    SciTech Connect

    HARMON, B.C.

    2000-01-14

    This document provides a detailed account of how the acceptance testing was conducted for Project L-286, ''200E Area Sanitary Water Plant Effluent Stream Reduction''. The testing of the L-286 instrumentation system was conducted under the direct supervision

  20. Nitrogen trailer acceptance test report

    SciTech Connect

    Kostelnik, A.J.

    1996-02-12

    This Acceptance Test Report documents compliance with the requirements of specification WHC-S-0249. The equipment was tested according to WHC-SD-WM-ATP-108 Rev.0. The equipment being tested is a portable contained nitrogen supply. The test was conducted at Norco`s facility.

  1. From requirements to acceptance tests

    NASA Technical Reports Server (NTRS)

    Baize, Lionel; Pasquier, Helene

    1993-01-01

    From user requirements definition to accepted software system, the software project management wants to be sure that the system will meet the requirements. For the development of a telecommunication satellites Control Centre, C.N.E.S. has used new rules to make the use of tracing matrix easier. From Requirements to Acceptance Tests, each item of a document must have an identifier. A unique matrix traces the system and allows the tracking of the consequences of a change in the requirements. A tool has been developed, to import documents into a relational data base. Each record of the data base corresponds to an item of a document, the access key is the item identifier. Tracing matrix is also processed, providing automatically links between the different documents. It enables the reading on the same screen of traced items. For example one can read simultaneously the User Requirements items, the corresponding Software Requirements items and the Acceptance Tests.

  2. W-026, acceptance test report manipulator system

    SciTech Connect

    Watson, T.L.

    1997-04-15

    The purpose of the WRAP Manipulator System Acceptance Test Plan (ATP) is to verify that the 4 glovebox sets of WRAP manipulator components, including rail/carriage, slave arm, master controller and auxiliary equipment, meets the requirements of the functional segments of 14590 specification. The demonstration of performance elements of the ATP are performed as a part of the Assembly specifications. Manipulator integration is integrated in the performance testing of the gloveboxes. Each requirement of the Assembly specification will be carried out in conjunction with glovebox performance tests.

  3. 24 CFR 203.202 - Plan acceptability and acceptance renewal criteria-general.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... HUD acceptance of such change or modification, except that changes mandated by other applicable laws... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Plan acceptability and acceptance... Underwriting Procedures Insured Ten-Year Protection Plans (plan) § 203.202 Plan acceptability and...

  4. Specific test and evaluation plan

    SciTech Connect

    Hays, W.H.

    1998-03-20

    The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AX-B Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP). Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the transfer line addition. The STEP will be utilized in conjunction with the TEP for verification and validation.

  5. Nevada Test Site Waste Acceptance Criteria (NTSWAC)

    SciTech Connect

    NNSA /NSO Waste Management Project

    2008-06-01

    This document establishes the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, Nevada Test Site Waste Acceptance Criteria (NTSWAC). The NTSWAC provides the requirements, terms, and conditions under which the Nevada Test Site will accept low-level radioactive (LLW) and LLW Mixed Waste (MW) for disposal.

  6. Nevada Test Site Waste Acceptance Criteria

    SciTech Connect

    U.S. Department of Energy, Nevada Operations Office, Waste Acceptance Criteria

    1999-05-01

    This document provides the requirements, terms, and conditions under which the Nevada Test Site will accept low-level radioactive and mixed waste for disposal; and transuranic and transuranic mixed waste for interim storage at the Nevada Test Site.

  7. DACS upgrade acceptance test report

    SciTech Connect

    Zuehlke, A.C.

    1994-12-21

    The DACS, which is housed in a trailer located just outside of the north fence at the SY tank farm, receives input signals from a variety of sensors located in and around the SY-101 tank. These sensors provide information such as: (1) tank vapor space and ventilation system H{sub 2} concentration; (2) tank waste temperature; (3) tank pressure; (4) waste density; (5) operating pump parameters such as speed, flow, rotational position, discharge pressure, and internal temperature; (6) strain (for major equipment); and (7) waste level. The output of these sensors is conditioned and transmitted to the DACS computers where these signals are displayed, recorded, and monitored for out-of-specification conditions. If abnormal conditions are detected, then, in certain situations, the DACS automatically generates alarms and causes the system to abort pump operations. The report documents testing performed per WHC-SD-WM-ATP-082. Rev. 0-13.

  8. Specific test and evaluation plan

    SciTech Connect

    Hays, W.H.

    1997-12-09

    The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AN-A Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a ``lower tier`` document based on the W-314 Test and Evaluation Plan (TEP) This STEP encompasses all testing activities required to demonstrate compliance to the project design criteria as it relates to the modifications of the AN-A valve pit. The Project Design Specifications (PDS) identify the specific testing activities required for the Project. Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the modifications to the 241-AN-A Valve Pit. The STEP will be utilized in conjunction with the TEP for verification and validation.

  9. Gas characterization system software acceptance test report

    SciTech Connect

    Vo, C.V.

    1996-03-28

    This document details the results of software acceptance testing of gas characterization systems. The gas characterization systems will be used to monitor the vapor spaces of waste tanks known to contain measurable concentrations of flammable gases.

  10. EPA proposes St. Regis Paper Co. Cleanup Plan, accepting comments

    EPA Pesticide Factsheets

    For Immediate Release No.16-OPA006 EPA proposes St. Regis Paper Co. Cleanup Plan; accepting comments CHICAGO (March 30, 2016) -- U.S. Environmental Protection Agency is issuing a proposed plan to clean up soil contamin

  11. 46 CFR 50.25-10 - Acceptance of piping components by specific letter or approved plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... manufacture, and complete chemical and mechanical test results with an accepted material specification. (3...) MARINE ENGINEERING GENERAL PROVISIONS Acceptance of Material and Piping Components § 50.25-10 Acceptance... approved plan must do the following: (1) Submit an engineering type catalog or representative drawings...

  12. 46 CFR 50.25-10 - Acceptance of piping components by specific letter or approved plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... manufacture, and complete chemical and mechanical test results with an accepted material specification. (3...) MARINE ENGINEERING GENERAL PROVISIONS Acceptance of Material and Piping Components § 50.25-10 Acceptance... approved plan must do the following: (1) Submit an engineering type catalog or representative drawings...

  13. Induction graphitizing furnace acceptance test report

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The induction furnace was designed to provide the controlled temperature and environment required for the post-cure, carbonization and graphitization processes for the fabrication of a fibrous graphite NERVA nozzle extension. The acceptance testing required six tests and a total operating time of 298 hrs. Low temperature mode operations, 120 to 850 C, were completed in one test run. High temperature mode operations, 120 to 2750 C, were completed during five tests.

  14. Void fraction instrument acceptance test procedure

    SciTech Connect

    Pearce, K.L.

    1994-09-15

    This acceptance test procedure (ATP) was written to test the void fraction instrument (VFI) and verify that the unit is ready for field service. The procedure verifies that the mechanical and electrical features (not specifically addressed in the software ATP) and software alarms are operating as designed.

  15. W-087 Acceptance test procedure. Revision 1

    SciTech Connect

    Joshi, A.W.

    1997-06-10

    This Acceptance Test Procedure/Operational Test Procedure (ATP/OTP) has been prepared to demonstrate that the Electrical/Instrumentation and Mechanical systems function as required by project criteria and to verify proper operation of the integrated system including the interlocks.

  16. Test Methods for Acceptance Testing of Telescopes

    DTIC Science & Technology

    1993-07-01

    instrument. Although various interferometer configurations are used, they all basically operate on the same principle. The beam from a stable continuous...a Goerz with a nominal focal length of 92 inches. This lens has been recoated and carefully aligned to produce excellent image quality. The focus...test. Such requirements are necessary when the procuring agency has no facilities for performing adequate tests. It is also an excellent policy even

  17. Acceptance test report 2721-Z upgrades

    SciTech Connect

    Keck, R.D.

    1998-02-03

    This test procedure provides instructions for acceptance testing of modifications to the 2721-Z diesel-generator system made by Project C-189. The modifications include (1) replacing the generator NUMA-LOGIC controller with connection to the PFP distributed control system (DCS), (2) replacing ATSI with a breaker switching scheme for 2736-ZB backup power and (3) providing a method for generator load and system testing.

  18. Development and application of an acceptance testing model

    NASA Technical Reports Server (NTRS)

    Pendley, Rex D.; Noonan, Caroline H.; Hall, Kenneth R.

    1992-01-01

    The process of acceptance testing large software systems for NASA has been analyzed, and an empirical planning model of the process constructed. This model gives managers accurate predictions of the staffing needed, the productivity of a test team, and the rate at which the system will pass. Applying the model to a new system shows a high level of agreement between the model and actual performance. The model also gives managers an objective measure of process improvement.

  19. Nevada Test Site Waste Acceptance Criteria

    SciTech Connect

    U. S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2005-10-01

    This document establishes the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) waste acceptance criteria (WAC). The WAC provides the requirements, terms, and conditions under which the Nevada Test Site (NTS) will accept low-level radioactive (LLW) and mixed waste (MW) for disposal. It includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the NTS Area 3 and Area 5 Radioactive Waste Management Complex (RWMC) for storage or disposal.

  20. Biodiesel Test Plan

    DTIC Science & Technology

    2014-07-01

    Biodiesel Test Plan Distribution Statement A: Approved for Public Release; distribution is unlimited. July 2014 Report No. CG-D-07-14...Appendix C) Biodiesel Test Plan ii UNCLAS//Public | CG-926 R&DC | G. W. Johnson, et al. Public | July 2014 N O T I C E This...Development Center 1 Chelsea Street New London, CT 06320 Biodiesel Test Plan iii UNCLAS//Public | CG-926 R&DC | G. W. Johnson, et al

  1. Site acceptance test, W-030 MICON system

    SciTech Connect

    Hill, L.F., Westinghouse Hanford

    1996-06-10

    Monitoring and control of the W-030 ventilation upgrade is provided by a distributed control system (DCS) furnished by MICON Corporation. After shipment to the Hanford Site, the site acceptance test (SAT) for this system was conducted in a laboratory environment over a six month period, involving four distinct phases and numerous hardware and software modifications required to correct test exceptions. The final results is a system which is not fully compliant with procurement specifications but is determined to meet minimum Project W-030 safety and functional requirements. A negotiated settlement was reached with the supplier to establish a `path forward` for system implementation. This report documents the `as-run` status of the SAT. The SAT was completed in August of 1995. It was later followed by comprehensive acceptance testing of the W-030 control-logic configuration software; results are documented in WHC-SD-W030-ATR-011. Further testing is reported as part of process system startup operational testing, performed after the MICON installation.

  2. Payload test philosophy. [JPL views on qualification/acceptance testing

    NASA Technical Reports Server (NTRS)

    Gindorf, T.

    1979-01-01

    The general philosophy of how JPL views payload qualification/acceptance testing for programs that are done either in-house or by contractors is described. Particular attention is given to mission risk classifications, preliminary critical design reviews, environmental design requirements, the thermal and dynamics development tests, and the flight spacecraft system test.

  3. Acceptance Test Report for 241-U compressed air system

    SciTech Connect

    Freeman, R.D.

    1994-10-20

    This Acceptance Test Report (ATR) documents the results of acceptance testing of a newly upgraded compressed air system at 241-U Farm. The system was installed and the test successfully performed under work package 2W-92-01027.

  4. AMSD Test Plan

    NASA Technical Reports Server (NTRS)

    Stahl, H. Philip; Hadaway, James; Burdine, Robert (Technical Monitor)

    2001-01-01

    NASA MSFC is the lead center on the Advanced Mirror System Demonstrator (AMSD) project and therefore has responsibility for testing each AMSD mirror to certify its compliance with the SOW. To accomplish this task it is necessary to accurately characterize each mirror's Radius of Curvature, Optical Axis Vertex Location, Conic Constant and Surface Figure Error. A key challenge is how to measure these parameters in the presence of gravity sag. This presentation will outline the MSFC/UAH team's proposed AMSD test plan.

  5. LCLS Undulator Test Plan

    SciTech Connect

    Wolf, Zachary

    2010-11-24

    This note presents the test plan for the LCLS undulators. The undulators will be measured and tuned in the Magnetic Measurement Facility at SLAC. The requirements for tuning are well established and are summarized. A brief discussion of the measurement equipment is presented. This is followed by the detailed test plan in which each step is enumerated. Finally, the measurement results and storage format are presented. The LCLS consists of 33 undulator segments, hereafter referred to as undulators, plus 6 spares and one reference undulator. The undulators must be tuned to meet strict requirements. They must also be fiducialized to allow alignment with other components. This note details the plan for tuning and fiducializing the LCLS undulators. The note begins with the list of tuning and fiducialization requirements. The laboratory in which the work will be performed and the relevant equipment is then briefly described. This is followed by a detailed test plan in which all the steps of tuning and fiducialization are enumerated.

  6. 46 CFR 164.023-11 - Acceptance tests.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 6 2014-10-01 2014-10-01 false Acceptance tests. 164.023-11 Section 164.023-11 Shipping...: SPECIFICATIONS AND APPROVAL MATERIALS Thread for Personal Flotation Devices § 164.023-11 Acceptance tests. (a) Performance testing. Manufacturers shall ensure that the performance tests described in § 164.023-7 (a) or...

  7. 46 CFR 164.023-11 - Acceptance tests.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 6 2011-10-01 2011-10-01 false Acceptance tests. 164.023-11 Section 164.023-11 Shipping...: SPECIFICATIONS AND APPROVAL MATERIALS Thread for Personal Flotation Devices § 164.023-11 Acceptance tests. (a) Performance testing. Manufacturers shall ensure that the performance tests described in § 164.023-7 (a) or...

  8. Probabilistic Requirements (Partial) Verification Methods Best Practices Improvement. Variables Acceptance Sampling Calculators: Empirical Testing. Volume 2

    NASA Technical Reports Server (NTRS)

    Johnson, Kenneth L.; White, K. Preston, Jr.

    2012-01-01

    The NASA Engineering and Safety Center was requested to improve on the Best Practices document produced for the NESC assessment, Verification of Probabilistic Requirements for the Constellation Program, by giving a recommended procedure for using acceptance sampling by variables techniques as an alternative to the potentially resource-intensive acceptance sampling by attributes method given in the document. In this paper, the results of empirical tests intended to assess the accuracy of acceptance sampling plan calculators implemented for six variable distributions are presented.

  9. Nevada Test Site Waste Acceptance Criteria, December 2000

    SciTech Connect

    2000-12-01

    This document establishes the US Department of Energy, Nevada Operations Office waste acceptance criteria. The waste acceptance criteria provides the requirements, terms, and conditions under which the Nevada Test Site will accept low-level radioactive waste and mixed waste for disposal. It includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the Nevada Test Site Area 3 and Area 5 Radioactive Waste Management Sites for storage or disposal.

  10. 105-KE Isolation Barrier Leak Rate Acceptance Test Report

    SciTech Connect

    McCracken, K.J.

    1995-06-14

    This Acceptance Test Report (ATR) contains the completed and signed Acceptance Procedure (ATP) for the 105-KE Isolations Barrier Leak Rate Test. The Test Engineer`s log, the completed sections of the ATP in the Appendix for Repeat Testing (Appendix K), the approved WHC J-7s (Appendix H), the data logger files (Appendices T and U), and the post test calibration checks (Appendix V) are included.

  11. Acceptance test report for the safety class shutdown system

    SciTech Connect

    Zuroff, W.F.

    1996-10-17

    This document provides the Acceptance Test Report for the successful testing of the Safety Shutdown Circuit. The test was done in accordance with the requirements that were defined in WHC-SD-WM-SCH-003, Interim Stabilization Safety Class Trip Circuit CGI Dedication Criteria. The actual test procedure document was contained in WHC-SD-WM-ATP-185, Acceptance Test Procedure for the Safety Class Shutdown System.

  12. 14 CFR 151.123 - Procedures: Offer; amendment; acceptance; advance planning agreement.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Procedures: Offer; amendment; acceptance... Planning and Engineering Proposals § 151.123 Procedures: Offer; amendment; acceptance; advance planning.... FAA's offer and the sponsor's acceptance constitute an advance planning grant agreement between...

  13. Operator coil monitoring Acceptance Test Procedure

    SciTech Connect

    Erhart, M.F.

    1995-05-16

    The readiness of the Data Acquisition and Control System (DACS) to provide monitoring and control of the Programmable Logic Controller (PLC) abort coils from the Master and RSS stations will be systematically tested during performance of this procedure. It should be noted that these are not physical abort coils but software coils controlled by the software`s ladder logic. The readiness of the DACS to properly interface with the ENRAF wire level gauge installed in the SY-101 storage tank will also be tested. During this test, a verification of all abort coil indications will be conducted at the DACS Development Facility in the 306E Building by injecting an input signal for each DACS sensor that has an associated abort coil until the abort coil actuates, and then ensuring that the status of the abort coil indicated at the Master and RSS stations is correct. Each abort coil will also be tested to ensure that the ``ENABLE`` and ``DISABLE`` controls from the Master and RSS stations function correctly, and only with the use of proper passwords.

  14. Operator coil monitoring acceptance test procedure

    SciTech Connect

    Erhart, M.F.

    1995-06-05

    The readiness of the Data Acquisition and Control System (DACS) to provide monitoring and control of the Programmable Logic Controller (PLC) abort coils from the Master and RSS stations will be systematically tested during performance of this procedure. It should be noted that these are not physical abort coils but software coils controlled by the software`s ladder logic. The readiness of the DACS to properly interface with the ENRAF wire level gauge installed in the SY101 storage tank will also be tested. During this test, a verification of all abort coil indications will be conducted at the DACS Development Facility in the 306E Building by injecting an input signal for each DACS sensor that has an associated abort coil until the abort coil actuates, and then ensuring that the status of the abort coil indicated at the Master and RSS stations correct. Each abort coil will also be tested to ensure that the ``ENABLE`` and ``DISABLE`` controls from the Master and RSS stations function correctly, and only with the use of proper passwords.

  15. The Murmansk Initiative - RF: Acceptance Testing

    SciTech Connect

    Czajkowski, C.; Wester, D. W.; Dyer, R. S.; Soerlie, A. A.; Moller, B.; Barnes, E.

    2002-02-26

    The Murmansk Initiative-RF (MI) was conceived to provide the Russian Federation (RF) with the capacity to manage low-level liquid radioactive waste (LLRW) and comply with the requirements of the London Convention that prohibit ocean dumping. The trilateral project among Norway, the RF, and the United States of America (U.S.) began in 1994 and was the first to utilize exclusively Russian subcontractors to upgrade and expand an existing LLRW treatment plant on the premises of RTP Atomflot in Murmansk, Russia. The project moved quickly through the design phase. Progress during the construction phase was somewhat slower because of difficulties with acquisition of hardware, inexperience with automated instrumentation and control equipment, and unexpected design changes in the cementation unit. The project advanced into the test-operation phase, which is currently underway, in June 2001. Initial runs with liquid waste have revealed that procedures for unloading spent ion-exchange sorbents could be improved and that sludges formed during removal of alkaline-earth metals should be compacted in order for the facility to operate at its full potential. Resolution of these issues is expected within the next few months.

  16. GMS/DACS interface acceptance test report

    SciTech Connect

    Zuehlke, A.C.

    1994-10-10

    The DACS, which is housed in a trailer located just outside of the north fence at the SY tank farm, receives input signals from a variety of sensors located in and around the SY-101 tank. These sensors provide information such as: tank vapor space and ventilation system H{sub 2} concentration; tank waste temperature; tank pressure; waste density; operating pump parameters such as speed, flow, rotational position, discharge pressure, and internal temperature; strain (for major equipment); and waste level. The output of these sensors is conditioned and transmitted to the DACS computers where these signals are displayed, recorded, and monitored for out-of-specification conditions. If abnormal conditions are detected, then, in certain situations, the DACS automatically generates alarms and causes the system to abort pump operations. The portions of the system to be tested include: new RGA5 gas monitor; existing gas chromatographs; FTIR; B and K (Photo) NH{sub 3} equipment; any new or changed Genesis screens; and I/O Drop 13.

  17. Product acceptance environmental and destructive testing for reliability.

    SciTech Connect

    Dvorack, Michael A.; Kerschen, Thomas J.; Collins, Elmer W.

    2007-08-01

    To determine whether a component is meeting its reliability requirement during production, acceptance sampling is employed in which selected units coming off the production line are subjected to additional environmental and/or destructive tests that are within the normal environment space to which the component is expected to be exposed throughout its life in the Stockpile. This report describes what these tests are and how they are scored for reliability purposes. The roles of screens, Engineering Use Only tests, and next assembly product acceptance testing are also discussed, along with both the advantages and disadvantages of environmental and destructive testing.

  18. WRAP low level waste (LLW) glovebox acceptance test report

    SciTech Connect

    Leist, K.J.

    1998-02-17

    In June 28, 1997, the Low Level Waste (LLW) glovebox was tested using glovebox acceptance test procedure 13031A-85. The primary focus of the glovebox acceptance test was to examine control system interlocks, display menus, alarms, and operator messages. Limited mechanical testing involving the drum ports, hoists, drum lifter, compacted drum lifter, drum tipper, transfer car, conveyors, lidder/delidder device and the supercompactor were also conducted. As of November 24, 1997, 2 of the 131 test exceptions that affect the LLW glovebox remain open. These items will be tracked and closed via the WRAP Master Test Exception Database. As part of Test Exception resolution/closure the responsible individual closing the Test Exception performs a retest of the affected item(s) to ensure the identified deficiency is corrected, and, or to test items not previously available to support testing. Test Exceptions are provided as appendices to this report.

  19. APU diaphragm testing. Test plan

    NASA Technical Reports Server (NTRS)

    Shelley, Richard

    1992-01-01

    Auxiliary Power Unit (APU) fuel (hydrazine) tanks have had to be removed from the Columbia Shuttle (OV-102) because they have been in service for 11 years, which is the limit of their useful life. As part of an effort to determine whether the useful life of the fuel tanks can be extended, examination of the ethylene propylene rubber (EPR) diaphragm and the metal from one of the APU tanks is required. The JSC Propulsion and Power Division has requested White Sands Test Facility (WSTF) to examine the EPR diaphragm thoroughly and the metal casing generally from one tank. The objective is to examine the EPR diaphragm for signs of degradation that may limit the life of its function in the APU propellant tank. The metal casing will also be examined for signs of surface corrosion.

  20. Evaluation and certification of heater assemblies developed for thermal vacuum acceptance testing

    NASA Technical Reports Server (NTRS)

    Allen, J. E.

    1986-01-01

    Preparation of Rockwell International's Thermal Vacuum Chamber for acceptance testing of a mass produced satellite required the development of unique quartz lamp and hot wire heater assemblies. Testing performed on the basic elements of these heaters is described, as is the final testing done to certify that the heater assemblies meet the thermal requirements for acceptance testing. The methods and procedures of thermal mapping used during the development and final certification of these heater assemblies are presented. The absence of a definitive standard for determining flux distribution and heating boundaries for heaters of this type required the development of a test plan incorporating several thermal mapping techniques. These techniques include the development of heat flux using a multiple calorimeter array for both vacuum and ambient test conditions, and a photographic method for detecting heating boundaries. The test plan and thermal mapping techniques are discussed.

  1. ISOLOK VALVE ACCEPTANCE TESTING FOR DWPF SME SAMPLING PROCESS

    SciTech Connect

    Edwards, T.; Hera, K.; Coleman, C.; Jones, M.; Wiedenman, B.

    2011-12-05

    Evaluation of the Defense Waste Processing Facility (DWPF) Chemical Process Cell (CPC) cycle time identified several opportunities to improve the CPC processing time. Of the opportunities, a focus area related to optimizing the equipment and efficiency of the sample turnaround time for DWPF Analytical Laboratory was identified. The Mechanical Systems & Custom Equipment Development (MS&CED) Section of the Savannah River National Laboratory (SRNL) evaluated the possibility of using an Isolok{reg_sign} sampling valve as an alternative to the Hydragard{reg_sign} valve for taking process samples. Previous viability testing was conducted with favorable results using the Isolok sampler and reported in SRNL-STI-2010-00749 (1). This task has the potential to improve operability, reduce maintenance time and decrease CPC cycle time. This report summarizes the results from acceptance testing which was requested in Task Technical Request (TTR) HLW-DWPF-TTR-2010-0036 (2) and which was conducted as outlined in Task Technical and Quality Assurance Plan (TTQAP) SRNL-RP-2011-00145 (3). The Isolok to be tested is the same model which was tested, qualified, and installed in the Sludge Receipt Adjustment Tank (SRAT) sample system. RW-0333P QA requirements apply to this task. This task was to qualify the Isolok sampler for use in the DWPF Slurry Mix Evaporator (SME) sampling process. The Hydragard, which is the current baseline sampling method, was used for comparison to the Isolok sampling data. The Isolok sampler is an air powered grab sampler used to 'pull' a sample volume from a process line. The operation of the sampler is shown in Figure 1. The image on the left shows the Isolok's spool extended into the process line and the image on the right shows the sampler retracted and then dispensing the liquid into the sampling container. To determine tank homogeneity, a Coliwasa sampler was used to grab samples at a high and low location within the mixing tank. Data from the two locations

  2. Regulatory perspectives on acceptability testing of dosage forms in children.

    PubMed

    Kozarewicz, Piotr

    2014-08-05

    Current knowledge about the age-appropriateness of different dosage forms is still fragmented or limited. Applicants are asked to demonstrate that the target age group(s) can manage the dosage form or propose an alternative strategy. However, questions remain about how far the applicant must go and what percentage of patients must find the strategy 'acceptable'. The aim of this overview is to provide an update on current thinking and understanding of the problem, and discuss issues relating to the acceptability testing. This overview should be considered as means to start a wider discussion which hopefully will result in a harmonised, globally acceptable approach for confirmation of the acceptability in the future.

  3. How to pass a sensor acceptance test: using the gap between acceptance criteria and operational performance

    NASA Astrophysics Data System (ADS)

    Bijl, Piet

    2016-10-01

    When acquiring a new imaging system and operational task performance is a critical factor for success, it is necessary to specify minimum acceptance requirements that need to be met using a sensor performance model and/or performance tests. Currently, there exist a variety of models and test from different origin (defense, security, road safety, optometry) and they all do different predictions. This study reviews a number of frequently used methods and shows the effects that small changes in procedure or threshold criteria can have on the outcome of a test. For example, a system may meet the acceptance requirements but not satisfy the needs for the operational task, or the choice of test may determine the rank order of candidate sensors. The goal of the paper is to make people aware of the pitfalls associated with the acquisition process, by i) illustrating potential tricks to have a system accepted that is actually not suited for the operational task, and ii) providing tips to avoid this unwanted situation.

  4. Test plan for Simulated Saltcake Retrieval Test

    SciTech Connect

    HERTING, D.L.

    2000-07-19

    This document describes the plan for a bench-scale laboratory test to evaluate physical and chemical parameters associated with dissolution of a simulated saltcake waste. Parameters to be measured during the test include water addition rate, liquid drainage rate, visual observations of flow patterns, physical appearance and volume of dissolving saltcake, chemical composition of drained liquid, and polarized light microscopy analysis of solids.

  5. Instrumentation Cables Test Plan

    SciTech Connect

    Muna, Alice Baca; LaFleur, Chris Bensdotter

    2016-10-01

    A fire at a nuclear power plant (NPP) has the potential to damage structures, systems, and components important to safety, if not promptly detected and suppressed. At Browns Ferry Nuclear Power Plant on March 22, 1975, a fire in the reactor building damaged electrical power and control systems. Damage to instrumentation cables impeded the function of both normal and standby reactor coolant systems, and degraded the operators’ plant monitoring capability. This event resulted in additional NRC involvement with utilities to ensure that NPPs are properly protected from fire as intended by the NRC principle design criteria (i.e., general design criteria 3, Fire Protection). Current guidance and methods for both deterministic and performance based approaches typically make conservative (bounding) assumptions regarding the fire-induced failure modes of instrumentation cables and those failure modes effects on component and system response. Numerous fire testing programs have been conducted in the past to evaluate the failure modes and effects of electrical cables exposed to severe thermal conditions. However, that testing has primarily focused on control circuits with only a limited number of tests performed on instrumentation circuits. In 2001, the Nuclear Energy Institute (NEI) and the Electric Power Research Institute (EPRI) conducted a series of cable fire tests designed to address specific aspects of the cable failure and circuit fault issues of concern1. The NRC was invited to observe and participate in that program. The NRC sponsored Sandia National Laboratories to support this participation, whom among other things, added a 4-20 mA instrumentation circuit and instrumentation cabling to six of the tests. Although limited, one insight drawn from those instrumentation circuits tests was that the failure characteristics appeared to depend on the cable insulation material. The results showed that for thermoset insulated cables, the instrument reading tended to drift

  6. Vendor System Vulnerability Testing Test Plan

    SciTech Connect

    James R. Davidson

    2005-01-01

    The Idaho National Laboratory (INL) prepared this generic test plan to provide clients (vendors, end users, program sponsors, etc.) with a sense of the scope and depth of vulnerability testing performed at the INL’s Supervisory Control and Data Acquisition (SCADA) Test Bed and to serve as an example of such a plan. Although this test plan specifically addresses vulnerability testing of systems applied to the energy sector (electric/power transmission and distribution and oil and gas systems), it is generic enough to be applied to control systems used in other critical infrastructures such as the transportation sector, water/waste water sector, or hazardous chemical production facilities. The SCADA Test Bed is established at the INL as a testing environment to evaluate the security vulnerabilities of SCADA systems, energy management systems (EMS), and distributed control systems. It now supports multiple programs sponsored by the U.S. Department of Energy, the U.S. Department of Homeland Security, other government agencies, and private sector clients. This particular test plan applies to testing conducted on a SCADA/EMS provided by a vendor. Before performing detailed vulnerability testing of a SCADA/EMS, an as delivered baseline examination of the system is conducted, to establish a starting point for all-subsequent testing. The series of baseline tests document factory delivered defaults, system configuration, and potential configuration changes to aid in the development of a security plan for in depth vulnerability testing. The baseline test document is provided to the System Provider,a who evaluates the baseline report and provides recommendations to the system configuration to enhance the security profile of the baseline system. Vulnerability testing is then conducted at the SCADA Test Bed, which provides an in-depth security analysis of the Vendor’s system.b a. The term System Provider replaces the name of the company/organization providing the system

  7. 46 CFR 164.013-5 - Acceptance tests.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 6 2011-10-01 2011-10-01 false Acceptance tests. 164.013-5 Section 164.013-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL MATERIALS Foam, Unicellular Polyethylene (Buoyant, Slab, Slitted Trigonal...

  8. 46 CFR 164.013-5 - Acceptance tests.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Acceptance tests. 164.013-5 Section 164.013-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL MATERIALS Foam, Unicellular Polyethylene (Buoyant, Slab, Slitted Trigonal...

  9. 46 CFR 164.013-5 - Acceptance tests.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 6 2012-10-01 2012-10-01 false Acceptance tests. 164.013-5 Section 164.013-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL MATERIALS Foam, Unicellular Polyethylene (Buoyant, Slab, Slitted Trigonal...

  10. 46 CFR 164.013-5 - Acceptance tests.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 6 2014-10-01 2014-10-01 false Acceptance tests. 164.013-5 Section 164.013-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL MATERIALS Foam, Unicellular Polyethylene (Buoyant, Slab, Slitted Trigonal...

  11. 46 CFR 164.013-5 - Acceptance tests.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 6 2013-10-01 2013-10-01 false Acceptance tests. 164.013-5 Section 164.013-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL MATERIALS Foam, Unicellular Polyethylene (Buoyant, Slab, Slitted Trigonal...

  12. SEP BIMOD variable conductance heat pipes acceptance and characterization tests

    NASA Technical Reports Server (NTRS)

    Hemminger, J. A.

    1981-01-01

    A series of six heat pipes, similar in design to those flown on the Comunications Technology Satellite Hermes, for use in a prototype Solar Electric Propulsion BIMOD thrust module are evaluated. The results of acceptance and characterization tests performed on the heat pipe subassemble are reported. The performance of all the heat pipes met, or exceeded, design specifications.

  13. Digface characterization test plan (remote testing)

    SciTech Connect

    Croft, K.; Hyde, R.; Allen, S.

    1993-08-01

    The objective of the Digface Characterization (DFC) Remote Testing project is to remotely deploy a sensor head (Mini-Lab) across a digface to determine if it can characterize the contents below the surface. The purpose of this project is to provide a robotics technology that allows removal of workers from hazards, increases speed of operations, and reduces life cycle costs compared to alternate methods and technologies. The Buried Waste Integrated Demonstration (BWID) is funding the demonstration, testing, and evaluation of DFC. This document describes the test plan for the DFC remote deployment demonstration for the BWID. The purposes of the test plan are to establish test parameters so that the demonstration results are deemed useful and usable and perform the demonstration in a safe manner and within all regulatory requirements.

  14. Proposed Performance Evaluation Acceptance Test for Heat Recovery Incinerators

    DTIC Science & Technology

    1988-08-01

    1985). D 3176, Method for Ultimate Analysis of Coal and Coke (1984). D 3180, Method for Calculating Coal and Coke Analyses from As-Determined to Differ...or approval of the use of such commercial products . The findings of this report are not to be construed as an official Department of the Army position...such as coal or oil fired boilers, no standard performance test is available to assess field performance or to use as an acceptance test for the HRI

  15. Redstone Test Stand Accepted Into National Register of Historical Places

    NASA Technical Reports Server (NTRS)

    1976-01-01

    On October 02, 1976, Marshall Space Flight Center's (MSFC) Redstone test stand was received into the National Registry of Historical Places. Photographed in front of the Redstone test stand are Dr. William R. Lucas, MSFC Center Director from June 15, 1974 until July 3, 1986, as he is accepting a certificate of registration from Madison County Commission Chairman James Record, and Huntsville architect Harvie Jones.

  16. NEVADA TEST SITE WASTE ACCEPTANCE CRITERIA, JUNE 2006

    SciTech Connect

    U.S. DEPARTMENT OF ENERGY, NATIONAL NUCLEAR SECURITY ADMINISTRATION NEVADA SITE OFFICE

    2006-06-01

    This document establishes the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) waste acceptance criteria (WAC). The WAC provides the requirements, terms, and conditions under which the Nevada Test Site (NTS) will accept low-level radioactive (LLW) and mixed waste (MW) for disposal. It includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the NTS Area 3 and Area 5 Radioactive Waste Management Complex (RWMC) for storage or disposal.

  17. Startup of the FFTF sodium cooled reactor. [Acceptance Test Program

    SciTech Connect

    Redekopp, R.D.; Umek, A.M.

    1981-03-01

    The Fast Flux Test Facility (FFTF), located on the Department of Energy (DOE) Hanford Reservation near Richland, Washington, is a 3 Loop 400 MW(t) sodium cooled fast reactor with a primary mission to test fuels and materials for development of the Liquid Metal Fast Breeder Reactor (LMFBR). Bringing FFTF to a condition to accomplish this mission is the goal of the Acceptance Test Program (ATP). This program was the mechanism for achieving startup of the FFTF. Highlights of the ATP involving the system inerting, liquid metal and inerted cell testing and initial ascent to full power are discussed.

  18. Avionics test bed development plan

    NASA Technical Reports Server (NTRS)

    Harris, L. H.; Parks, J. M.; Murdock, C. R.

    1981-01-01

    The plan is for a facility for the early investigation and evaluation of new concepts for the control of large space structures, orbiter attached flex body experiments, and orbiter enhancements. This plan outlines a distributed data processing facility that will utilize the current JSC laboratory resources for the test bed development. The future studies required for implementation, the management system for project control, and the baseline system configuration are described.

  19. Surface moisture measurement system hardware acceptance test report

    SciTech Connect

    Ritter, G.A., Westinghouse Hanford

    1996-05-28

    This document summarizes the results of the hardware acceptance test for the Surface Moisture Measurement System (SMMS). This test verified that the mechanical and electrical features of the SMMS functioned as designed and that the unit is ready for field service. The bulk of hardware testing was performed at the 306E Facility in the 300 Area and the Fuels and Materials Examination Facility in the 400 Area. The SMMS was developed primarily in support of Tank Waste Remediation System (TWRS) Safety Programs for moisture measurement in organic and ferrocyanide watch list tanks.

  20. MCO combustible gas management leak test acceptance criteria

    SciTech Connect

    SHERRELL, D.L.

    1999-05-11

    Existing leak test acceptance criteria for mechanically sealed and weld sealed multi-canister overpacks (MCO) were evaluated to ensure that MCOs can be handled and stored in stagnant air without compromising the Spent Nuclear Fuel Project's overall strategy to prevent accumulation of combustible gas mixtures within MCO's or within their surroundings. The document concludes that the integrated leak test acceptance criteria for mechanically sealed and weld sealed MCOs (1 x 10{sup -5} std cc/sec and 1 x 10{sup -7} std cc/sec, respectively) are adequate to meet all current and foreseeable needs of the project, including capability to demonstrate compliance with the NFPA 60 Paragraph 3-3 requirement to maintain hydrogen concentrations [within the air atmosphere CSB tubes] t or below 1 vol% (i.e., at or below 25% of the LFL).

  1. Test Planning Approach and Lessons

    NASA Technical Reports Server (NTRS)

    Parkinson, Douglas A.; Brown, Kendall K.

    2004-01-01

    As NASA began technology risk reduction activities and planning for the next generation launch vehicle under the Space Launch Initiative (SLI), now the Next Generation Launch Technology (NGLT) Program, a review of past large liquid rocket engine development programs was performed. The intent of the review was to identify any significant lessons from the development testing programs that could be applied to current and future engine development programs. Because the primary prototype engine in design at the time of this study was the Boeing-Rocketdyne RS-84, the study was slightly biased towards LOX/RP-1 liquid propellant engines. However, the significant lessons identified are universal. It is anticipated that these lessons will serve as a reference for test planning in the Engine Systems Group at Marshall Space Flight Center (MSFC). Towards the end of F-1 and J-2 engine development testing, NASA/MSFC asked Rocketdyne to review those test programs. The result was a document titled, Study to Accelerate Development by Test of a Rocket Engine (R-8099). The "intent (of this study) is to apply this thinking and learning to more efficiently develop rocket engines to high reliability with improved cost effectivenes" Additionally, several other engine programs were reviewed - such as SSME, NSTS, STME, MC-1, and RS-83- to support or refute the R-8099. R-8099 revealed two primary lessons for test planning, which were supported by the other engine development programs. First, engine development programs can benefit from arranging the test program for engine system testing as early as feasible. The best test for determining environments is at the system level, the closest to the operational flight environment. Secondly, the component testing, which tends to be elaborate, should instead be geared towards reducing risk to enable system test. Technical risk can be reduced at the component level, but the design can only be truly verified and validated after engine system testing.

  2. Waste feed delivery test and evaluation plan

    SciTech Connect

    O'TOOLE, S.M.

    1999-09-30

    This plan documents the Waste Feed Delivery Program test and evaluation planning and implementation approach. The purpose of this document is to define and communicate the Waste Feed Delivery Program Test and Evaluation scope, objectives, planning and implementation approach.

  3. 242A Distributed Control System Year 2000 Acceptance Test Report

    SciTech Connect

    TEATS, M.C.

    1999-08-31

    This report documents acceptance test results for the 242-A Evaporator distributive control system upgrade to D/3 version 9.0-2 for year 2000 compliance. This report documents the test results obtained by acceptance testing as directed by procedure HNF-2695. This verification procedure will document the initial testing and evaluation of the potential 242-A Distributed Control System (DCS) operating difficulties across the year 2000 boundary and the calendar adjustments needed for the leap year. Baseline system performance data will be recorded using current, as-is operating system software. Data will also be collected for operating system software that has been modified to correct year 2000 problems. This verification procedure is intended to be generic such that it may be performed on any D/3{trademark} (GSE Process Solutions, Inc.) distributed control system that runs with the VMSTM (Digital Equipment Corporation) operating system. This test may be run on simulation or production systems depending upon facility status. On production systems, DCS outages will occur nine times throughout performance of the test. These outages are expected to last about 10 minutes each.

  4. Remote Excavation System test plan

    SciTech Connect

    Walker, S.; Hyde, R.A.

    1993-05-01

    The Office of Technology Development (OTD) established the Robotics Technology Development Program (RTDP) to integrate robotic development activities on a national basis; provide needs-oriented, timely, and economical robotics technology to support environmental and waste operations activities at Department of Energy (DOE) sites; and provide the focus and direction for the near term (less than five years) and guidance for the tong-term (five to twenty years) research and development efforts for site-specific problems. The RTDP consists of several programs including the Buried Waste Robotics Program (BWRP), which addresses remote buried waste applications. The Remote Excavation System (RES) was developed under the RTDP to provide a safer method of excavating hazardous materials for both the DOE and the Department of Defense (DOD). The excavator, initially developed by the DOD as a manually-operated small excavator, has been modified for teleoperation with joint funding from the BWRP and the DOD. The Buried Waste Integrated Demonstration (BWID) and the Uranium Soils Integrated Demonstration (USID) are funding the demonstration, testing, and evaluation of the RES covered in this test plan. This document covers testing both at Oak Ridge National Laboratory (ORNL) and the Idaho National Engineering Laboratory (INEL), as funded by BWID and USID. This document describes the tests planned for the RES demonstration for the BWRP. The purposes of the test plan are (1) to establish test parameters to ensure that the demonstration results are deemed useful and usable and (2) to demonstrate performance in a safe manner within all regulatory requirements.

  5. Nevada Test Site waste acceptance criteria [Revision 1

    SciTech Connect

    1997-08-01

    Revision one updates the requirements, terms, and conditions under which the Nevada Test Site (NTS) will accept low-level radioactive and mixed waste for disposal; and transuranic and transuranic mixed waste for interim storage at the NTS. Review each section of this document. This document is not intended to include all of the requirements; rather, it is meant as a guide toward meeting the regulations. All references in this document should be observed to avoid omission of requirements on which acceptance or rejection of waste will be based. The Department of Energy/Nevada Operations Office (DOE/NV) and support contractors are available to assist you in understanding or interpreting this document.

  6. Avionics test bed development plan

    NASA Technical Reports Server (NTRS)

    Harris, L. H.; Parks, J. M.; Murdock, C. R.

    1981-01-01

    A development plan for a proposed avionics test bed facility for the early investigation and evaluation of new concepts for the control of large space structures, orbiter attached flex body experiments, and orbiter enhancements is presented. A distributed data processing facility that utilizes the current laboratory resources for the test bed development is outlined. Future studies required for implementation, the management system for project control, and the baseline system configuration are defined. A background analysis of the specific hardware system for the preliminary baseline avionics test bed system is included.

  7. AUSSAT-B spacecraft qualification and acceptance testing

    NASA Astrophysics Data System (ADS)

    Pike, Gordon H. S.; Day, Robert S.; Gatta, John D.

    The AUSSAT-B spacecraft are the first two examples of the new HS601 series of body stabi1ized satellites being built by Hughes Aircraft Company. Prior to the first launch in early 1992, the satellites will have been subjected to extensive unit, subsystem, and system level tests. The satellites will also undergo thorough in-orbit tests after being delivered on-station. This paper concentrates on the subsystem and system level tests for qualification and acceptance of the satellites. Because the anticipated market for the HS601 design includes both commercial and Government (including military) applications the qualification and protoflight philosophy adopted for the first flight spacecraft program represents a potentially unique combination of test requirements.

  8. 46 CFR 50.25-10 - Acceptance of piping components by specific letter or approved plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) MARINE ENGINEERING GENERAL PROVISIONS Acceptance of Material and Piping Components § 50.25-10 Acceptance... approved plan must do the following: (1) Submit an engineering type catalog or representative drawings of... specifications by comparing details of the materials' chemical composition, mechanical properties, method...

  9. 46 CFR 50.25-10 - Acceptance of piping components by specific letter or approved plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) MARINE ENGINEERING GENERAL PROVISIONS Acceptance of Material and Piping Components § 50.25-10 Acceptance... approved plan must do the following: (1) Submit an engineering type catalog or representative drawings of... specifications by comparing details of the materials' chemical composition, mechanical properties, method...

  10. Acceptance test report for project C-157 ``T-Plant electrical upgrade``

    SciTech Connect

    Jeppson, L.A.

    1997-08-05

    This Acceptance Test Report (ATR) documents for record purposes the field results, acceptance, and approvals of the completed acceptance test per WHC-SD-Cl57-ATP-001, Rev. 0, ``Acceptance Test Proceedure for Project C-157 `T Plant Electrical Upgrade``` The test was completed and approved without any problems or exceptions.

  11. Procedures for acceptance testing of solar energy systems

    NASA Astrophysics Data System (ADS)

    Johnson, D. L.; Joncich, D. M.

    1984-04-01

    This report describes research on the use of simple, low-cost meters for measuring the performance of solar energy systems in Army buildings and for comparing the measured performance with the design specification requirements. The requirements of meters for measuring the performance of solar energy systems were defined. A BTU-Meter for measuring heat transfer was designed, and commercial meters for taking other measurements were obtained. The meters were installed in a solar system in the laboratory and a pilot test of the acceptance test was done. Suggested draft revisions to Corps of Engineers design documents were prepared; designers could use these revisions to include acceptance testing provisions in solar energy system design. It was found that in a short-duration test, simple, low-cost meters can be used to determine whether a newly installed solar energy system is operating as specified. The simplicity of the metering approach allows designers to routinely include metering in the solar system design. The contractor can easily install the meters with the other solar components. Since the meters are so versatile, they can be used continuously for long-term performance monitoring. This gives the designer performance data and allows maintenance personnel to detect and diagnose solar equipment malfunctions. Thus, solar energy system metering can provide a unified, low-cost approach for meeting the wide range of measurement needs of Army solar energy systems.

  12. Acceptance test report: Field test of mixer pump for 241-AN-107 caustic addition project

    SciTech Connect

    Leshikar, G.A.

    1997-05-16

    The field acceptance test of a 75 HP mixer pump (Hazleton serial number N-20801) installed in Tank 241-AN-107 was conducted from October 1995 thru February 1996. The objectives defined in the acceptance test were successfully met, with two exceptions recorded. The acceptance test encompassed field verification of mixer pump turntable rotation set-up and operation, verification that the pump instrumentation functions within established limits, facilitation of baseline data collection from the mixer pump mounted ultrasonic instrumentation, verification of mixer pump water flush system operation and validation of a procedure for its operation, and several brief test runs (bump) of the mixer pump.

  13. NASA's Plan for SDLS Testing

    NASA Technical Reports Server (NTRS)

    Bailey, Brandon

    2015-01-01

    The Space Data Link Security (SDLS) Protocol is a Consultative Committee for Space Data Systems (CCSDS) standard which extends the known Data Link protocols to secure data being sent over a space link by providing confidentiality and integrity services. This plan outlines the approach by National Aeronautics Space Administration (NASA) in performing testing of the SDLS protocol using a prototype based on an existing NASA missions simulator.

  14. Acceptance test procedure for SY Tank Farm replacement exhauster unit

    SciTech Connect

    Becken, G.W.

    1994-12-16

    The proper functioning of a new 241-SY Tank Farm replacement exhauster will be acceptance tested, to establish operability and to provide an operational baseline for the equipment. During this test, a verification of all of the alarm and control circuits associated with the exhaust, which provide operating controls and/or signals to local and remote alarm/annunciator panels, shall be performed. Test signals for sensors that provide alarms, warnings, and/or interlocks will be applied to verify that alarm, warning, and interlock setpoints are correct. Alarm and warning lights, controls, and local and remote readouts for the exhauster will be verified to be adequate for proper operation of the exhauster. Testing per this procedure shall be conducted in two phases. The first phase of testing, to verify alarm, warning, and interlock setpoints primarily, will be performed in the MO-566 Fab Shop. The second phase of testing, to verify proper operation and acceptable interface with other tank farm systems, will be conducted after the exhauster and all associated support and monitoring equipment have been installed in the SY Tank Farm. The exhauster, which is mounted on a skid and which will eventually be located in the SY tank farm, receives input signals from a variety of sensors mounted on the skid and associated equipment. These sensors provide information such as: exhauster system inlet vacuum pressure; prefilter and HEPA filter differential pressures; exhaust stack sampler status; exhaust fan status; system status (running/shut down); and radiation monitoring systems status. The output of these sensors is transmitted to the exhauster annunciator panel where the signals are displayed and monitored for out-of-specification conditions.

  15. Perceived Use and Acceptance of Cloud Enterprise Resource Planning (ERP) Implementation in the Manufacturing Industries

    ERIC Educational Resources Information Center

    Adeboje, Adewale

    2015-01-01

    The purpose of this study was to gain an insight into perceived use and acceptance for implementing an enterprise resource planning system and the decision whether to contract out the enterprise resource planning (ERP) service to a cloud provider. Cloud-based ERP systems can provide many advantages to the normal implementation of the same systems…

  16. Elevated drum testing Phase 1 test plan

    SciTech Connect

    McBeath, R.S.; Meeuwsen, P.V.

    1994-09-01

    An important part of the Hanford environmental mission is the packaging, transportation, and storage of solid radioactive wastes in metal drums. Presently storage drums are placed four to a wooden pallet with the drums banded to each other. Palletized drums are stacked three units high in pre-engineered steel structures in the 200 Area of the Hanford site. Permitted storage space is expensive to construct, maintain, and operate. Storage capacity is increased if additional drum can be stacked within existing facilities and a cost savings over new construction realized. The purpose of this plan is to outline the testing required to provide the safety criteria for elevated (i.e., tiers of four high) drum storage. The major safety concern with elevated drum storage is the danger of a significant fire in the storage facility. The major fire load within the storage facilities is combustible material contained in the drums. If a seismic event, fork lift accident, or other credible incident were to cause drum failure or lid separation, combustible material could be available for fuel. To increase the initial burn in the facilities, the drums must spill their combustible contents, making them free for ignition. If it can be shown that there is not sufficient damage to the drums to allow for release of their solid contents, then the data used for safety documentation will be re-examined. Preliminary tests conducted in the configurations detailed in this test plan have shown that drums maintain their integrity; that is the drum covers remain attached and the drums do not breach. These tests will be conducted by Westinghouse Hanford Company, Equipment Development organization, who is the designated DOE Center of Excellence to conduct drop tests for Department of Transportation (DOT) certification of DOE designed packages and containers.

  17. 7 CFR 1755.400 - RUS standard for acceptance tests and measurements of telecommunications plant.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 11 2011-01-01 2011-01-01 false RUS standard for acceptance tests and measurements of..., ACCEPTABLE MATERIALS, AND STANDARD CONTRACT FORMS § 1755.400 RUS standard for acceptance tests and... acceptance tests and measurements on installed copper and fiber optic telecommunications plant and equipment....

  18. Topographical mapping system for radiological and hazardous environments acceptance testing

    NASA Astrophysics Data System (ADS)

    Armstrong, Gary A.; Dochat, G. R.

    1997-09-01

    During the summer of 1996, the topographical mapping system (TMS) for hazardous and radiological environments and its accompanying three-dimensional (3-D) visualization tool, the interactive computer-enhanced remote-viewing system (ICERVS), were delivered to Oak Ridge National Laboratory (ORNL). ORNL and Mechanical Technology, Inc., performed final acceptance testing of the TMS during the next eight months. The TMS was calibrated and characterized during this period. This paper covers the calibration, characterization, and acceptance testing of the TMS. Development of the TMS and the ICERVS was initiated by the U.S. Department of Energy (DOE) for the purpose of characterization and remediation of underground storage tanks (USTs) at DOE sites across the country. DOE required a 3-D, topographical mapping system suitable for use in hazardous and radiological environments. The intended application is the mapping of the interior of USTs as part of DOE's waste characterization and remediation efforts and to obtain baseline data on the content of the storage tank interiors as well as data on changes in the tank contents and levels brought about by waste remediation steps. Initially targeted for deployment at the Hanford Washington site, the TMS is designed to be a self-contained, compact, reconfigurable system that is capable of providing rapid, variable-resolution mapping information in poorly characterized workspaces with a minimum of operator intervention.

  19. Test Report for Acceptance Test Procedure for Pumping and Instrumentation Control Skid ''K''

    SciTech Connect

    JOHNS, B.R.

    1999-10-28

    This is a Test Report for Acceptance Test Procedure (ATP) HNF-4276. This test report provides the results of the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''K''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  20. Factory acceptance test results for the DIRSP projection optics

    NASA Astrophysics Data System (ADS)

    Thomas, Matthew C.; Ward, Craig S.

    2000-07-01

    The Factory Acceptance Test (FAT) results for the projection optical subsystem (POS) of US Army STIRCOM's dynamic infrared scene projector (DIRSP) are presented in this paper. DIRSP is a low background (-35 degrees Celsius) hardware-in-the- loop (HWIL), long-wave infrared (LWIR) scene projector built by Mission Research Corporation (MRC) for use by the Redstone Technical Test Center (RTTC). It has an effective emitter array size of 1632 X 672 suspended-membrane micro-resistor elements. The POS is responsible for generating this effective array size from three smaller arrays using a mosaic image combiner, adding background light from an external blackbody, and collimating the combined radiation with a 5:1 vacuum enclosed -35 degree Celsius zoom lens. The FAT results reported demonstrate good POS performance compared to the design for focal length, F/#, MTF and apparent temperature.

  1. 78 FR 53483 - Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 3

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-29

    ... COMMISSION Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 3 AGENCY: Nuclear Regulatory Commission. ACTION: Determination of inspections, tests, analyses, and..., tests, and analyses have been successfully completed, and that the specified acceptance criteria are...

  2. 78 FR 53484 - Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 4

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-29

    ... COMMISSION Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 4 AGENCY: Nuclear Regulatory Commission. ACTION: Determination of inspections, tests, analyses, and..., tests, and analyses have been successfully completed, and that the specified acceptance criteria are...

  3. Type of Speech Material Affects Acceptable Noise Level Test Outcome

    PubMed Central

    Koch, Xaver; Dingemanse, Gertjan; Goedegebure, André; Janse, Esther

    2016-01-01

    The acceptable noise level (ANL) test, in which individuals indicate what level of noise they are willing to put up with while following speech, has been used to guide hearing aid fitting decisions and has been found to relate to prospective hearing aid use. Unlike objective measures of speech perception ability, ANL outcome is not related to individual hearing loss or age, but rather reflects an individual’s inherent acceptance of competing noise while listening to speech. As such, the measure may predict aspects of hearing aid success. Crucially, however, recent studies have questioned its repeatability (test–retest reliability). The first question for this study was whether the inconsistent results regarding the repeatability of the ANL test may be due to differences in speech material types used in previous studies. Second, it is unclear whether meaningfulness and semantic coherence of the speech modify ANL outcome. To investigate these questions, we compared ANLs obtained with three types of materials: the International Speech Test Signal (ISTS), which is non-meaningful and semantically non-coherent by definition, passages consisting of concatenated meaningful standard audiology sentences, and longer fragments taken from conversational speech. We included conversational speech as this type of speech material is most representative of everyday listening. Additionally, we investigated whether ANL outcomes, obtained with these three different speech materials, were associated with self-reported limitations due to hearing problems and listening effort in everyday life, as assessed by a questionnaire. ANL data were collected for 57 relatively good-hearing adult participants with an age range representative for hearing aid users. Results showed that meaningfulness, but not semantic coherence of the speech material affected ANL. Less noise was accepted for the non-meaningful ISTS signal than for the meaningful speech materials. ANL repeatability was comparable

  4. Acceptance test procedure for Project W-049H

    SciTech Connect

    Buckles, D.I.

    1994-09-29

    The Acceptance Test Procedure (ATP) program for Project W-049H (200 Area Treated Effluent Disposal Facility [TEDF]) covers three activities as follows: (1) Disposal System; (2) Collection System; and (3) Instrumentation and Control System. Each activity has its own ATP. The purpose of the ATPs is to reverify that the systems have been constructed in accordance with the construction documents and to demonstrate that the systems function as required by the Project criteria. The Disposal System ATP covers the testing of the following: disposal line flowmeters, room air temperatures in the Disposal Station Sampling Building, effluent valves and position indicators, disposal pond level monitors, automated sampler, pressure relief valves, and overflow diversion sluice gates. The Collection System ATP covers the testing of the two pump stations and all equipment installed therein. The Instrumentation and Control (I and C) ATP covers the testing of the entire TEDF I and C system. This includes 3 OCS units, modem, and GPLI cabinets in the ETC control room; 2 pump stations; disposal station sampling building; and all LCUs installed in the field.

  5. Loss on Ignition Furnace Acceptance and Operability Test Procedure

    SciTech Connect

    JOHNSTON, D.C.

    2000-08-23

    The purpose of this Acceptance Test Procedure and Operability Test Procedure (ATP/OTP)is to verify the operability of newly installed Loss on Ignition (LOI) equipment, including a model 1608FL CMTM Furnace, a dessicator, and balance. The operability of the furnace will be verified. The arrangement of the equipment placed in Glovebox 157-3/4 to perform LOI testing on samples supplied from the Thermal Stabilization line will be verified. In addition to verifying proper operation of the furnace, this ATP/OTP will also verify the air flow through the filters, verify a damper setting to establish and maintain the required differential pressure between the glovebox and the room pressure, and test the integrity of the newly installed HEPA filter. In order to provide objective evidence of proper performance of the furnace, the furnace must heat 15 crucibles, mounted on a crucible rack, to 1000 C, according to a program entered into the furnace controller located outside the glovebox. The glovebox differential pressure will be set to provide the 0.5 to 2.0 inches of water (gauge) negative pressure inside the glovebox with an expected airflow of 100 to 125 cubic feet per minute (cfm) through the inlet filter. The glovebox inlet G1 filter will be flow tested to ensure the integrity of the filter connections and the efficiency of the filter medium. The newly installed windows and glovebox extension, as well as all disturbed joints, will be sonically tested via ultra probe to verify no leaks are present. The procedure for DOS testing of the filter is found in Appendix A.

  6. Loss on Ignition Furnace Acceptance and Operability Test Procedure

    SciTech Connect

    JOHNSON, D.C.

    2000-06-01

    The purpose of this Acceptance Test Procedure and Operability Test Procedure (ATP/OTP)is to verify the operability of newly installed LOI equipment, including a model 1608FL CM{trademark} Furnace, a dessicator, and balance. The operability of the furnace will be verified. The arrangement of the equipment placed in Glovebox 157-3/4 to perform Loss on Ignition (LOI) testing on samples supplied from the Thermal Stabilization line will be verified. In addition to verifying proper operation of the furnace, this ATP/OTP will also verify the air flow through the filters, verify a damper setting to establish and maintain the required differential pressure between the glovebox and the room pressure, and test the integrity of the newly installed HEPA filter. In order to provide objective evidence of proper performance of the furnace, the furnace must heat 15 crucibles, mounted on a crucible rack, to 1000 C, according to a program entered into the furnace controller located outside the glovebox. The glovebox differential pressure will be set to provide the 0.5 to 2.0 inches of water (gauge) negative pressure inside the glovebox with an airflow of 100 to 125 cubic feet per minute (cfm) through the inlet filter. The glovebox inlet Glfilter will he flow tested to ensure the integrity of the filter connections and the efficiency of the filter medium. The newly installed windows and glovebox extension, as well as all disturbed joints, will be sonically tested via ultra probe to verify no leaks are present. The procedure for DOS testing of the filter is found in Appendix A.

  7. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid Q

    SciTech Connect

    KOCH, M.R.

    2000-05-11

    This Acceptance Test Report (ATR) provides the test results for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''Q''. The ATR summaries the results and provides a copy of the ATP and inspections in the Appendix.

  8. Secondary Waste Cast Stone Waste Form Qualification Testing Plan

    SciTech Connect

    Westsik, Joseph H.; Serne, R. Jeffrey

    2012-09-26

    The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is being constructed to treat the 56 million gallons of radioactive waste stored in 177 underground tanks at the Hanford Site. The WTP includes a pretreatment facility to separate the wastes into high-level waste (HLW) and low-activity waste (LAW) fractions for vitrification and disposal. The LAW will be converted to glass for final disposal at the Integrated Disposal Facility (IDF). Cast Stone – a cementitious waste form, has been selected for solidification of this secondary waste stream after treatment in the ETF. The secondary-waste Cast Stone waste form must be acceptable for disposal in the IDF. This secondary waste Cast Stone waste form qualification testing plan outlines the testing of the waste form and immobilization process to demonstrate that the Cast Stone waste form can comply with the disposal requirements. Specifications for the secondary-waste Cast Stone waste form have not been established. For this testing plan, Cast Stone specifications are derived from specifications for the immobilized LAW glass in the WTP contract, the waste acceptance criteria for the IDF, and the waste acceptance criteria in the IDF Permit issued by the State of Washington. This testing plan outlines the testing needed to demonstrate that the waste form can comply with these waste form specifications and acceptance criteria. The testing program must also demonstrate that the immobilization process can be controlled to consistently provide an acceptable waste form product. This testing plan also outlines the testing needed to provide the technical basis for understanding the long-term performance of the waste form in the disposal environment. These waste form performance data are needed to support performance assessment analyses of the long-term environmental impact of the secondary-waste Cast Stone waste form in the IDF

  9. Test report for run-in acceptance testing of hydrogen mitigation retrieval Pump-3

    SciTech Connect

    Berglin, B.G.

    1997-08-15

    This report will provide the findings of the demonstration test conducted on the Double-Shell Tank (DST) 241-SY-101 HMR Pump-3 in accordance with WHC-SDWM-TP-434 ``Test plan for run-in acceptance testing of hydrogen mitigation/retrieval pump-3`` at the 400 Area Maintenance and Storage Facility (MASF) building from 7 June 1996 through 30 July 1996 per work package 4A-96-92/W. The DST 241-SY-101 hydrogen mitigation retrieval Pump-3 is a 200-HP submersible electric driven pump that has been modified for use in the DST 241-SY-101 containing mixed waste located in the 200W area. The pump has a motor driven rotation mechanism that allows the pump column to rotate through 355{degree}. Prior to operation, pre-operational checks were performed which included loop calibration grooming and alignment of instruments, learning how plumb HMR-3 assembly hung in a vertical position and bump test of the motor to determine rotation direction. The pump was tested in the MASF Large Diameter Cleaning Vessel (LDCV) with process water at controlled temperatures and levels. In addition, the water temperature of the cooling water to the motor oil heat exchanger was recorded during testing. A 480-volt source powered a Variable Frequency Drive (VFD). The VFD powered the pump at various frequencies and voltages to control speed and power output of the pump. A second VFD powered the oil cooling pump. A third VFD was not available to operate the rotational drive motor during the 72 hour test, so it was demonstrated as operational before and after the test. A Mini Acquisition and Control System (Mini-DACS) controls pump functions and monitoring of the pump parameters. The Mini-DACS consists of three computers, software and some Programmable Logic Controllers (PLC). Startup and shutdown of either the pump motor or the oil cooling pump can be accomplished by the Mini-DACS. When the pump was in operation, the Mini-DACS monitors automatically collects data electronically. However, some required data

  10. Empirical Testing of a Theoretical Extension of the Technology Acceptance Model: An Exploratory Study of Educational Wikis

    ERIC Educational Resources Information Center

    Liu, Xun

    2010-01-01

    This study extended the technology acceptance model and empirically tested the new model with wikis, a new type of educational technology. Based on social cognitive theory and the theory of planned behavior, three new variables, wiki self-efficacy, online posting anxiety, and perceived behavioral control, were added to the original technology…

  11. Overcoming Denial through the Group: A Test of Acceptance Theory.

    ERIC Educational Resources Information Center

    Rugel, Robert P.; Barry, Denise

    1990-01-01

    Found participants (N=28) in alcohol treatment groups showed decreases in denial of drinking problems and decreases in psychopathology following 12 weeks of group counseling. Determined greater self-acceptance was associated with experiencing acceptance by group and with greater decreases in denial; decreases in denial and psychopathology were…

  12. In situ vitrification large-scale operational acceptance test analysis

    SciTech Connect

    Buelt, J.L.; Carter, J.G.

    1986-05-01

    A thermal treatment process is currently under study to provide possible enhancement of in-place stabilization of transuranic and chemically contaminated soil sites. The process is known as in situ vitrification (ISV). In situ vitrification is a remedial action process that destroys solid and liquid organic contaminants and incorporates radionuclides into a glass-like material that renders contaminants substantially less mobile and less likely to impact the environment. A large-scale operational acceptance test (LSOAT) was recently completed in which more than 180 t of vitrified soil were produced in each of three adjacent settings. The LSOAT demonstrated that the process conforms to the functional design criteria necessary for the large-scale radioactive test (LSRT) to be conducted following verification of the performance capabilities of the process. The energy requirements and vitrified block size, shape, and mass are sufficiently equivalent to those predicted by the ISV mathematical model to confirm its usefulness as a predictive tool. The LSOAT demonstrated an electrode replacement technique, which can be used if an electrode fails, and techniques have been identified to minimize air oxidation, thereby extending electrode life. A statistical analysis was employed during the LSOAT to identify graphite collars and an insulative surface as successful cold cap subsidence techniques. The LSOAT also showed that even under worst-case conditions, the off-gas system exceeds the flow requirements necessary to maintain a negative pressure on the hood covering the area being vitrified. The retention of simulated radionuclides and chemicals in the soil and off-gas system exceeds requirements so that projected emissions are one to two orders of magnitude below the maximum permissible concentrations of contaminants at the stack.

  13. Acceptance test procedure for the 105-KW isolation barrier leak rate

    SciTech Connect

    McCracken, K.J.

    1995-05-19

    This acceptance test procedure shall be used to: First establish a basin water loss rate prior to installation of the two isolation barriers between the main basin and the discharge chute in K-Basin West. Second, perform an acceptance test to verify an acceptable leakage rate through the barrier seals. This Acceptance Test Procedure (ATP) has been prepared in accordance with CM-6-1 EP 4.2, Standard Engineering Practices.

  14. Influence of gender of the teaching staff on students' acceptance of a virtual implant planning course.

    PubMed

    Nkenke, Emeka; Vairaktaris, Elefterios; Schaller, Hans-Günter; Perisanidis, Christos; Eitner, Stephan

    2017-02-09

    Acceptance of new technology is influenced by a number of situational and social factors. So far, only limited data are available on the influence of the teaching staff's gender on the acceptance of virtual dental implant planning by students. This study aimed at assessing the influence of the teaching staff's gender on the acceptance of a virtual implant planning course by male and female undergraduate dental students and their general attitude toward implantology. Two groups of third-year dental students (group 1, 9 males, 22 females; group 2, 12 males, 20 females) attended a virtual dental implant planning course. For the first group the teaching staff was all-male, while the teaching staff was all-female for the second group. After completion of the course the students filled in a technology acceptance questionnaire. An all-female teaching staff led to a degree of technology acceptance that did not differ significantly for male and female students. When the teaching staff was all-male, significant differences for technology acceptance occurred between male and female students. However, male as well as female students attributed the practice of implantology to both genders of dentists, equally, without statistically significant difference independent of the gender of the teaching staff. The more evenly distributed degree of technology acceptance of students of both genders being taught by a female staff is a favorable effect which may be explained by the more egalitarian style of women. Therefore, while feminization in dentistry proceeds, adequate measures should be taken to increase the number of female teachers.

  15. Single Event Effect (SEE) Test Planning 101

    NASA Technical Reports Server (NTRS)

    LaBel, Kenneth A.; Pellish, Jonathan; Berg, Melanie D.

    2011-01-01

    This is a course on SEE Test Plan development. It is an introductory discussion of the items that go into planning an SEE test that should complement the SEE test methodology used. Material will only cover heavy ion SEE testing and not proton, LASER, or other though many of the discussed items may be applicable. While standards and guidelines for how-to perform single event effects (SEE) testing have existed almost since the first cyclotron testing, guidance on the development of SEE test plans has not been as easy to find. In this section of the short course, we attempt to rectify this lack. We consider the approach outlined here as a "living" document: mission specific constraints and new technology related issues always need to be taken into account. We note that we will use the term "test planning" in the context of those items being included in a test plan.

  16. Chain Sampling as Used in Armor Acceptance Testing

    DTIC Science & Technology

    1989-09-01

    excessive (attribute), or he may measure the time in milk before the cereal becomes soggy (variable). Sampling by attributes is a dichotomous situation...introduces a new pre-sweetened breakfast cereal , they spend millions of dollars in advertisement costs with the hope that the consumer will sample it. Here...the consumer con- siders the entire supply of this new cereal as a single manufactured lot, to be accepted or rejected. Product acceptance, in this

  17. 46 CFR 54.05-17 - Weld toughness test acceptance criteria.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 2 2011-10-01 2011-10-01 false Weld toughness test acceptance criteria. 54.05-17... PRESSURE VESSELS Toughness Tests § 54.05-17 Weld toughness test acceptance criteria. (a) For Charpy V-notch impact tests the energy absorbed in both the weld metal and heat affected zone impact tests in...

  18. Cassini RTG Acceptance Test Results and RTG Performance on Galileo and Ulysses

    DOE R&D Accomplishments Database

    Kelly, C. E.; Klee, P. M.

    1997-06-01

    Flight acceptance testing has been completed for the RTGs to be used on the Cassini spacecraft which is scheduled for an October 6, 1997 launch to Saturn. The acceptance test program includes vibration tests, magnetic field measurements, properties (weight and c.g.) and thermal vacuum test. This paper presents The thermal vacuum test results. Three RTGs are to be used, F 2, F 6, and F 7. F 5 is tile back up RTG, as it was for the Galileo and Ulysses missions launched in 1989 and 1990, respectively. RTG performance measured during the thermal vacuum tests carried out at die Mound Laboratory facility met all specification requirements. Beginning of mission (BOM) and end of mission (EOM) power predictions have been made based on than tests results. BOM power is predicted to be 888 watts compared to the minimum requirement of 826 watts. Degradation models predict the EOM power after 16 years is to be 640 watts compared to a minimum requirement of 596 watts. Results of small scale module tests are also showing. The modules contain couples from the qualification and flight production runs. The tests have exceeded 28,000 hours (3.2 years) and are continuing to provide increased confidence in the predicted long term performance of the Cassini RTGs. All test results indicate that the power requirements of the Cassini spacecraft will be met. BOM and EOM power margins of over five percent are predicted. Power output from telemetry for the two Galileo RTGs are shown from the 1989 launch to the recent Jupiter encounter. Comparisons of predicted, measured and required performance are shown. Telemetry data are also shown for the RTG on the Ulysses spacecraft which completed its planned mission in 1995 and is now in the extended mission.

  19. Cassini RTG acceptance test results and RTG performance on Galileo and Ulysses

    SciTech Connect

    Kelly, C.E.; Klee, P.M.

    1997-12-31

    Flight acceptance testing has been completed for the RTGs to be used on the Cassini spacecraft which is scheduled for an October 6, 1997 launch to Saturn. The acceptance test program includes vibration tests, magnetic field measurements, mass properties (weight and c.g.) and thermal vacuum test. This paper presents the thermal vacuum test results. Three RTGs are to be used, F-2, F-6, and F-7. F-5 is the backup RTG, as it was for the Galileo and Ulysses missions launched in 1989 and 1990, respectively. RTG performance measured during the thermal vacuum tests carried out at the Mound Laboratory facility met all specification requirements. Beginning of mission (BOM) and end of mission (EOM) power predictions have been made based on these tests results. BOM power is predicted to be 888 watts compared to the minimum requirement of 826 watts. Degradation models predict the EOM power after 16 years is to be 640 watts compared to a minimum requirement of 596 watts. Results of small scale module tests are also shown. The modules contain couples from the qualification and flight production runs. The tests have exceeded 28,000 hours (3.2 years) and are continuing to provide increased confidence in the predicted long term performance of the Cassini RTGs. All test results indicate that the power requirements of the Cassini spacecraft will be met. BOM and EOM power margins of over 5% are predicted. Power output from telemetry for the two Galileo RTGs are shown from the 1989 launch to the recent Jupiter encounter. Comparisons of predicted, measured and required performance are shown. Telemetry data are also shown for the RTG on the Ulysses spacecraft which completed its planned mission in 1995 and is now in the extended mission.

  20. Cassini RTG acceptance test results and RTG performance on Galileo and Ulysses

    SciTech Connect

    Kelly, C.E.; Klee, P.M.

    1997-06-01

    Flight acceptance testing has been completed for the RTGs to be used on the Cassini spacecraft which is scheduled for an October 6, 1997 launch to Saturn. The acceptance test program includes vibration tests, magnetic field measurements, properties (weight and c.g.) and thermal vacuum test. This paper presents The thermal vacuum test results. Three RTGs are to be used, F-2, F-6, and F-7. F-5 is tile back-up RTG, as it was for the Galileo and Ulysses missions launched in 1989 and 1990, respectively. RTG performance measured during the thermal vacuum tests carried out at die Mound Laboratory facility met all specification requirements. Beginning of mission (BOM) and end of mission (EOM) power predictions have been made based on than tests results. BOM power is predicted to be 888 watts compared to the minimum requirement of 826 watts. Degradation models predict the EOM power after 16 years is to be 640 watts compared to a minimum requirement of 596 watts. Results of small scale module tests are also showing. The modules contain couples from the qualification and flight production runs. The tests have exceeded 28,000 hours (3.2 years) and are continuing to provide increased confidence in the predicted long term performance of the Cassini RTGs. All test results indicate that the power requirements of the Cassini spacecraft will be met. BOM and EOM power margins of over five percent are predicted. Power output from telemetry for the two Galileo RTGs are shown from the 1989 launch to the recent Jupiter encounter. Comparisons of predicted, measured and required performance are shown. Telemetry data are also shown for the RTG on the Ulysses spacecraft which completed its planned mission in 1995 and is now in the extended mission.

  1. Rock support system development test plan

    SciTech Connect

    Patricio, J.G. . Rockwell Hanford Operations)

    1984-03-30

    The Test Plan has been prepared to support design activities for the development of a rock support system for a Nuclear Waste Repository in Basalt (NWRB). The rock support system is assumed to consist of a combination of shotcrete and rock bolts. The seven testing activities include mix development and physical testing of shotcrete, durability testing of shotcrete, durability testing of rock bolt grouts, field tests on rock bolts, field testing of shotcrete, and heated room test. The objective of the Test Plan is to develop required data through combined laboratory, field, and office studies for design and design validation of the rock support system. The overall Test Plan is developed to provide a logical progression from laboratory tests performed to characterize fundamental thermomechanical properties of shotcrete and grouts, to field tests on rock bolts and shotcrete, and in situ performance tests. 21 refs., 15 figs., 33 tabs.

  2. Space Suit Portable Life Support System (PLSS) 2.0 Pre-Installation Acceptance (PIA) Testing

    NASA Technical Reports Server (NTRS)

    Watts, Carly; Vogel, Matthew

    2016-01-01

    Following successful completion of the space suit Portable Life Support System (PLSS) 1.0 development and testing in 2011, the second system-level prototype, PLSS 2.0, was developed in 2012 to continue the maturation of the advanced PLSS design which is intended to reduce consumables, improve reliability and robustness, and incorporate additional sensing and functional capabilities over the current Space Shuttle/International Space Station Extravehicular Mobility Unit (EMU) PLSS. PLSS 2.0 represents the first attempt at a packaged design comprising first generation or later component prototypes and medium fidelity interfaces within a flight-like representative volume. Pre-Installation Acceptance (PIA) is carryover terminology from the Space Shuttle Program referring to the series of test sequences used to verify functionality of the EMU PLSS prior to installation into the Space Shuttle airlock for launch. As applied to the PLSS 2.0 development and testing effort, PIA testing designated the series of 27 independent test sequences devised to verify component and subsystem functionality, perform in situ instrument calibrations, generate mapping data to define set-points for control algorithms, evaluate hardware performance against advanced PLSS design requirements, and provide quantitative and qualitative feedback on evolving design requirements and performance specifications. PLSS 2.0 PIA testing was carried out from 3/20/13 - 3/15/14 using a variety of test configurations to perform test sequences that ranged from stand-alone component testing to system-level testing, with evaluations becoming increasingly integrated as the test series progressed. Each of the 27 test sequences was vetted independently, with verification of basic functionality required before completion. Because PLSS 2.0 design requirements were evolving concurrently with PLSS 2.0 PIA testing, the requirements were used as guidelines to assess performance during the tests; after the completion of PIA

  3. Space Suit Portable Life Support System (PLSS) 2.0 Pre-Installation Acceptance (PIA) Testing

    NASA Technical Reports Server (NTRS)

    Anchondo, Ian; Cox, Marlon; Meginnis, Carly; Westheimer, David; Vogel, Matt R.

    2016-01-01

    Following successful completion of the space suit Portable Life Support System (PLSS) 1.0 development and testing in 2011, the second system-level prototype, PLSS 2.0, was developed in 2012 to continue the maturation of the advanced PLSS design. This advanced PLSS is intended to reduce consumables, improve reliability and robustness, and incorporate additional sensing and functional capabilities over the current Space Shuttle/International Space Station Extravehicular Mobility Unit (EMU) PLSS. PLSS 2.0 represents the first attempt at a packaged design comprising first generation or later component prototypes and medium fidelity interfaces within a flight-like representative volume. Pre-Installation Acceptance (PIA) is carryover terminology from the Space Shuttle Program referring to the series of test sequences used to verify functionality of the EMU PLSS prior to installation into the Space Shuttle airlock for launch. As applied to the PLSS 2.0 development and testing effort, PIA testing designated the series of 27 independent test sequences devised to verify component and subsystem functionality, perform in situ instrument calibrations, generate mapping data, define set-points, evaluate control algorithms, evaluate hardware performance against advanced PLSS design requirements, and provide quantitative and qualitative feedback on evolving design requirements and performance specifications. PLSS 2.0 PIA testing was carried out in 2013 and 2014 using a variety of test configurations to perform test sequences that ranged from stand-alone component testing to system-level testing, with evaluations becoming increasingly integrated as the test series progressed. Each of the 27 test sequences was vetted independently, with verification of basic functionality required before completion. Because PLSS 2.0 design requirements were evolving concurrently with PLSS 2.0 PIA testing, the requirements were used as guidelines to assess performance during the tests; after the

  4. Service User- and Carer-Reported Measures of Involvement in Mental Health Care Planning: Methodological Quality and Acceptability to Users

    PubMed Central

    Gibbons, Chris J.; Bee, Penny E.; Walker, Lauren; Price, Owen; Lovell, Karina

    2014-01-01

    Background: Increasing service user and carer involvement in mental health care planning is a key healthcare priority but one that is difficult to achieve in practice. To better understand and measure user and carer involvement, it is crucial to have measurement questionnaires that are both psychometrically robust and acceptable to the end user. Methods: We conducted a systematic review using the terms “care plan$,” “mental health,” “user perspective$,” and “user participation” and their linguistic variants as search terms. Databases were searched from inception to November 2012, with an update search at the end of September 2014. We included any articles that described the development, validation or use of a user and/or carer-reported outcome measures of involvement in mental health care planning. We assessed the psychometric quality of each instrument using the “Evaluating the Measurement of Patient-Reported Outcomes” (EMPRO) criteria. Acceptability of each instrument was assessed using novel criteria developed in consultation with a mental health service user and carer consultation group. Results: We identified eleven papers describing the use, development, and/or validation of nine user/carer-reported outcome measures. Psychometric properties were sparsely reported and the questionnaires met few service user/carer-nominated attributes for acceptability. Where reported, basic psychometric statistics were of good quality, indicating that some measures may perform well if subjected to more rigorous psychometric tests. The majority were deemed to be too long for use in practice. Discussion: Multiple instruments are available to measure user/carer involvement in mental health care planning but are either of poor quality or poorly described. Existing measures cannot be considered psychometrically robust by modern standards, and cannot currently be recommended for use. Our review has identified an important knowledge gap, and an urgent need to

  5. 33 CFR 155.1065 - Procedures for plan submission, approval, requests for acceptance of alternative planning...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... complete English language copy of a vessel response plan to Commandant (CG-5431), Coast Guard, 2100 2nd St... appeal that determination to the Prevention Policy Directorate for Marine Safety, Security,...

  6. 49 CFR 180.411 - Acceptable results of tests and inspections.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... the test must be properly repaired. (g) Pressure test. Any tank that fails to meet the acceptance... 49 Transportation 2 2010-10-01 2010-10-01 false Acceptable results of tests and inspections. 180... results of tests and inspections. (a) Corroded or abraded areas. The minimum thickness may not be...

  7. 49 CFR 180.411 - Acceptable results of tests and inspections.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... the test must be properly repaired. (g) Pressure test. Any tank that fails to meet the acceptance... 49 Transportation 3 2011-10-01 2011-10-01 false Acceptable results of tests and inspections. 180... results of tests and inspections. (a) Corroded or abraded areas. The minimum thickness may not be...

  8. 49 CFR 180.411 - Acceptable results of tests and inspections.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... the test must be properly repaired. (g) Pressure test. Any tank that fails to meet the acceptance... 49 Transportation 3 2012-10-01 2012-10-01 false Acceptable results of tests and inspections. 180... results of tests and inspections. (a) Corroded or abraded areas. The minimum thickness may not be...

  9. 49 CFR 180.411 - Acceptable results of tests and inspections.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... the test must be properly repaired. (g) Pressure test. Any tank that fails to meet the acceptance... 49 Transportation 3 2013-10-01 2013-10-01 false Acceptable results of tests and inspections. 180... results of tests and inspections. (a) Corroded or abraded areas. The minimum thickness may not be...

  10. 49 CFR 180.511 - Acceptable results of inspections and tests.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... acceptance criteria. (f) Leakage pressure test. A tank car successfully passes the leakage pressure test when... 49 Transportation 3 2011-10-01 2011-10-01 false Acceptable results of inspections and tests. 180... results of inspections and tests. Provided it conforms with other applicable requirements of...

  11. 49 CFR 180.411 - Acceptable results of tests and inspections.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... the test must be properly repaired. (g) Pressure test. Any tank that fails to meet the acceptance... 49 Transportation 3 2014-10-01 2014-10-01 false Acceptable results of tests and inspections. 180... results of tests and inspections. (a) Corroded or abraded areas. The minimum thickness may not be...

  12. SU-E-T-60: A Plan Quality Index in IMRT QA That Is Independent of the Acceptance Criteria

    SciTech Connect

    Kim, D; Kang, S; Kim, T; Kim, K; Cho, M; Shin, D; Suh, T; Kim, S; Park, S

    2015-06-15

    Purpose: In IMRT QA, plan quality evaluation is made based on pass rate under preset acceptance criteria, mostly using gamma-values. This method is convenient but, its Result highly depends on what the acceptance criteria are and suffers from the lack of sensitivity in judging how good the plan is. In this study, we introduced a simple but effective plan quality index of IMRT QA based on dose difference only to supplement such shortcomings, and investigated its validity. Methods: The proposed index is a single value which is calculated mainly based on point-by-point comparison between planned and measured dose distributions, and it becomes “1” in an ideal case. A systematic evaluation was performed with one-dimensional test dose distributions. For 3 hypothetical dose profiles, various displacements (in both dose and space) were introduced, the proposed index was calculated for each case, and the behavior of obtained indices was analyzed and compared with that of gamma evaluation. In addition, the feasibility of the index was assessed with clinical IMRT/VMAT/SBRT QA cases for different sites (prostate, head & neck, liver, lung, spine, and abdomen). Results: The proposed index showed more robust correlation with the amount of induced displacement compared to the gamma evaluation method. No matter what the acceptance criteria are (e.g., whether 3%/3mm or 2%/2mm), it was possible to clearly rank every case with the proposed index while it was difficult to do with the gamma evaluation method. Conclusion: IMRT plan quality can be evaluated quantitatively by the proposed index. It is considered that the proposed index would provide useful information for better judging the level of goodness of each plan and its Result is independent of the acceptance criteria. This work was supported by the Radiation Technology R&D program (No. 2013M2A2A7043498) and the Mid-career Researcher Program (2014R1A2A1A10050270) through the National Research Foundation of Korea funded by the

  13. Proposed acceptance, qualification, and characterization tests for thin-film PV modules

    NASA Technical Reports Server (NTRS)

    Waddington, D.; Mrig, L.; Deblasio, R.; Ross, R.

    1988-01-01

    Details of a proposed test program for PV thin-film modules which the Department of Energy has directed the Solar Energy Research Institute (SERI) to prepare are presented. Results of one of the characterization tests that SERI has performed are also presented. The objective is to establish a common approach to testing modules that will be acceptable to both users and manufacturers. The tests include acceptance, qualification, and characterization tests. Acceptance tests verify that randomly selected modules have similar characteristics. Qualification tests are based on accelerated test methods designed to simulate adverse conditions. Characterization tests provide data on performance in a predefined environment.

  14. EVALUATION OF ARG-1 SAMPLES PREPARED BY CESIUM CARBONATE DISSOLUTION DURING THE ISOLOK SME ACCEPTABILITY TESTING

    SciTech Connect

    Edwards, T.; Hera, K.; Coleman, C.

    2011-12-05

    Evaluation of Defense Waste Processing Facility (DWPF) Chemical Process Cell (CPC) cycle time identified several opportunities to improve the CPC processing time. The Mechanical Systems & Custom Equipment Development (MS&CED) Section of the Savannah River National Laboratory (SRNL) recently completed the evaluation of one of these opportunities - the possibility of using an Isolok sampling valve as an alternative to the Hydragard valve for taking DWPF process samples at the Slurry Mix Evaporator (SME). The use of an Isolok for SME sampling has the potential to improve operability, reduce maintenance time, and decrease CPC cycle time. The SME acceptability testing for the Isolok was requested in Task Technical Request (TTR) HLW-DWPF-TTR-2010-0036 and was conducted as outlined in Task Technical and Quality Assurance Plan (TTQAP) SRNLRP-2011-00145. RW-0333P QA requirements applied to the task, and the results from the investigation were documented in SRNL-STI-2011-00693. Measurement of the chemical composition of study samples was a critical component of the SME acceptability testing of the Isolok. A sampling and analytical plan supported the investigation with the analytical plan directing that the study samples be prepared by a cesium carbonate (Cs{sub 2}CO{sub 3}) fusion dissolution method and analyzed by Inductively Coupled Plasma - Optical Emission Spectroscopy (ICP-OES). The use of the cesium carbonate preparation method for the Isolok testing provided an opportunity for an additional assessment of this dissolution method, which is being investigated as a potential replacement for the two methods (i.e., sodium peroxide fusion and mixed acid dissolution) that have been used at the DWPF for the analysis of SME samples. Earlier testing of the Cs{sub 2}CO{sub 3} method yielded promising results which led to a TTR from Savannah River Remediation, LLC (SRR) to SRNL for additional support and an associated TTQAP to direct the SRNL efforts. A technical report resulting

  15. PDSS/IMC qualification test software acceptance procedures

    NASA Technical Reports Server (NTRS)

    1984-01-01

    Tests to be performed for qualifying the payload development support system image motion compensator (IMC) are identified. The performance of these tests will verify the IMC interfaces and thereby verify the qualification test software.

  16. Experimental Test Plan for Grouting H-3 Calcine

    SciTech Connect

    Alan K. Herbst

    2006-01-01

    Approximately 4400 cubic meters of solid high-level waste called calcine are stored at the Idaho Nuclear Technology and Engineering Center. Under the Idaho Cleanup Project, dual disposal paths are being investigated. The first path includes calcine retrieval, package "as-is", and ship to the Monitored Geological Repository (MGR). The second path involves treatment of the calcine with such methods as vitrification or grouting. This test plan outlines the hot bench scale tests to grout actual calcine and verify that the waste form properties meet the waste acceptance criteria. This is a necessary sequential step in the process of qualifying a new waste form for repository acceptance. The archive H-3 calcine samples at the Contaminated Equipment Maintenance Building attached to New Waste Calcining Facility will be used in these tests at the Remote Analytical Laboratory. The tests are scheduled for the second quarter of fiscal year 2007.

  17. Opportunistic screening for genital chlamydial infection. I: Acceptability of urine testing in primary and secondary healthcare settings

    PubMed Central

    Pimenta, J; Catchpole, M; Rogers, P; Perkins, E; Jackson, N; Carlisle, C; Randall, S; Hopwood, J; Hewitt, G; Underhill, G; Mallinson, H; McLean, L; Gleave, T; Tobin, J; Harindra, V; Ghosh, A

    2003-01-01

    Objectives: To determine the acceptability of opportunistic screening for Chlamydia trachomatis in young people in a range of healthcare settings. Design: An opportunistic screening programme (1 September 1999 to 31 August 2000) using urine samples tested by ligase chain reaction (LCR). Data on uptake and testing were collected and in-depth interviews were used for programme evaluation. Setting: General practice, family planning, genitourinary medicine clinics, adolescent sexual health clinics, termination of pregnancy clinics, and women's services in hospitals (antenatal, colposcopy, gynaecology and infertility clinics) in two health authorities (Wirral and Portsmouth and South East Hampshire). Main participants: Sexually active women aged between 16 and 24 years attending healthcare settings for any reason. Main outcome measures: Uptake data: proportion of women accepting a test by area, healthcare setting, and age; overall population coverage achieved in 1 year. Evaluation data: participants' attitudes and views towards opportunistic screening and urine testing. Results: Acceptance of testing by women (16–24 years) was 76% in Portsmouth and 84% in Wirral. Acceptance was lower in younger women (Portsmouth only) and varied by healthcare setting within each site. 50% of the target female population were screened in Portsmouth and 39% in Wirral. Both the opportunistic offer of screening and the method of screening were universally acceptable. Major factors influencing a decision to accept screening were the non-invasive nature of testing and treatment, desire to protect future fertility, and the experimental nature of the screening programme. Conclusions: An opportunistic model of urine screening for chlamydial infection is a practical, universally acceptable method of screening. PMID:12576607

  18. Department of Defense picture archiving and communication system acceptance testing: results and identification of problem components.

    PubMed

    Allison, Scott A; Sweet, Clifford F; Beall, Douglas P; Lewis, Thomas E; Monroe, Thomas

    2005-09-01

    The PACS implementation process is complicated requiring a tremendous amount of time, resources, and planning. The Department of Defense (DOD) has significant experience in developing and refining PACS acceptance testing (AT) protocols that assure contract compliance, clinical safety, and functionality. The DOD's AT experience under the initial Medical Diagnostic Imaging Support System contract led to the current Digital Imaging Network-Picture Archiving and Communications Systems (DIN-PACS) contract AT protocol. To identify the most common system and component deficiencies under the current DIN-PACS AT protocol, 14 tri-service sites were evaluated during 1998-2000. Sixteen system deficiency citations with 154 separate types of limitations were noted with problems involving the workstation, interfaces, and the Radiology Information System comprising more than 50% of the citations. Larger PACS deployments were associated with a higher number of deficiencies. The most commonly cited systems deficiencies were among the most expensive components of the PACS.

  19. End User Acceptance - Requirements or Specifications, Certification, Testing

    NASA Technical Reports Server (NTRS)

    Jeevarajan, Judith

    2013-01-01

    NASA follows top level safety requirement of two-failure tolerance (t hree levels of controls or design for minimum risk) to all catastroph ic hazards in the design of safe li-ion batteries for space use. ? R igorous development testing at appropriate levels to credible offnominal conditions and review of test data. ? Implement robust design con trols based on test results and test again to confirm safety at the a ppropriate levels. ? Stringent testing of all (100%) flight batteries (from button cells to large batteries).

  20. Electronic Systems Test Laboratory (ESTL) User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Robinson, Neil

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ESTL. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  1. Radiant Heat Test Facility (RHTF): User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    DelPapa, Steven

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the RHTF. The User Test Planning Guide aids in establishing expectations for both NASA and non- NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  2. Structures Test Laboratory (STL). User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Zipay, John J.

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the STL. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  3. Vibration and Acoustic Test Facility (VATF): User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Fantasia, Peter M.

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the VATF. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  4. Antenna Test Facility (ATF): User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Lin, Greg

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ATF. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  5. Testing the acceptability of liquid fish oil in older adults.

    PubMed

    Yaxley, Alison; Miller, Michelle D; Fraser, Robert J; Cobiac, Lynne; Crotty, Maria

    2011-01-01

    Inflammatory conditions likely to benefit from fish oil therapy are prevalent in older adults however acceptability in this group is uncertain. This study aimed to assess the palatability of a range of liquid fish oil concentrations, the frequency and extent of side effects, and to summarise any effects on adherence to fish oil therapy in older adults. One hundred patients (>=60 years) completed a randomised, single-blind palatability study, conducted in two parts. In part one, 50 subjects, blinded to random sample order, consumed multiple liquid fish oil samples (2x10%, 40% and 100%). In part two, 50 subjects tasted one concentration, or 100% extra light olive oil (control). Pleasantness of taste was scored on a 5-point Likert scale. Side effects were recorded 24-hr post-tasting. Results of part one showed that 9/50 participants reported increasingly unpleasant taste with increasing fish oil concentration. 14/50 reported unpleasant taste for 100% fish oil vs 7/50 for 10%. 14/50 reported side effects which would not affect compliance with therapy. For part two, 1/12 reported unpleasant taste for 100% vs 0/13 for 10% fish oil or control. 4/50 reported side effects and 2/4 indicated these would prevent ongoing fish oil therapy. The authors conclude that taste itself is not a deterrent to fish oil therapy. Furthermore, reported adverse effects may not be a true reaction to fish oil, or dissuade patients from compliance. Liquid fish oil supplements are acceptable to older adults, therefore should be investigated as a therapy for geriatric conditions.

  6. 46 CFR 164.023-11 - Acceptance tests.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... identification tests are conducted: (1) The average length/weight ratio of the thread in meters per kilogram... analysis, thermogravimetric analysis, differential scanning calorimeter, or other equivalent means...

  7. 46 CFR 164.023-11 - Acceptance tests.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... identification tests are conducted: (1) The average length/weight ratio of the thread in meters per kilogram... analysis, thermogravimetric analysis, differential scanning calorimeter, or other equivalent means...

  8. GPS test range mission planning

    NASA Astrophysics Data System (ADS)

    Roberts, Iris P.; Hancock, Thomas P.

    The principal features of the Test Range User Mission Planner (TRUMP), a PC-resident tool designed to aid in deploying and utilizing GPS-based test range assets, are reviewed. TRUMP features time history plots of time-space-position information (TSPI); performance based on a dynamic GPS/inertial system simulation; time history plots of TSPI data link connectivity; digital terrain elevation data maps with user-defined cultural features; and two-dimensional coverage plots of ground-based test range assets. Some functions to be added during the next development phase are discussed.

  9. Retrofit and acceptance test of 30-cm ion thrusters

    NASA Technical Reports Server (NTRS)

    Poeschel, R. L.

    1981-01-01

    Six 30 cm mercury thrusters were modified to the J-series design and evaluated using standardized test procedures. The thruster performance meets the design objectives (lifetime objective requires verification), and documentation (drawings, etc.) for the design is completed and upgraded. The retrofit modifications are described and the test data for the modifications are presented and discussed.

  10. CANMET Gasifier Liner Coupon Material Test Plan

    SciTech Connect

    Mark Fitzsimmons; Alan Darby; Fred Widman

    2005-10-30

    The test plan detailed in this topical report supports Task 1 of the project titled ''Development of Technologies and Capabilities for Coal Energy Resources - Advanced Gasification Systems Development (AGSD)''. The purpose of these tests is to verify that materials planned for use in an advanced gasifier pilot plant will withstand the environments in a commercial gasifier. Pratt & Whitney Rocketdyne (PWR) has developed and designed the cooled liner test assembly article that will be tested at CANMET Energy Technology Centre (CETC-O) in Ottawa, Ontario, Canada (CETC-O). The Test Plan TP-00364 is duplicated in its entirety, with formatting changes to comply with the format required for this Topical Report. The table of contents has been modified to include the additional material required by this topical report. Test Request example and drawings of non-proprietary nature are also included as appendices.

  11. Waste retrieval sluicing system data acquisition system acceptance test report

    SciTech Connect

    Bevins, R.R.

    1998-07-31

    This document describes the test procedure for the Project W-320 Tank C-106 Sluicing Data Acquisition System (W-320 DAS). The Software Test portion will test items identified in the WRSS DAS System Description (SD), HNF-2115. Traceability to HNF-2115 will be via a reference that follows in parenthesis, after the test section title. The Field Test portion will test sensor operability, analog to digital conversion, and alarm setpoints for field instrumentation. The W-320 DAS supplies data to assist thermal modeling of tanks 241-C-106 and 241-AY-102. It is designed to be a central repository for information from sources that would otherwise have to be read, recorded, and integrated manually. Thus, completion of the DAS requires communication with several different data collection devices and output to a usable PC data formats. This test procedure will demonstrate that the DAS functions as required by the project requirements stated in Section 3 of the W-320 DAS System Description, HNF-2115.

  12. Tank Monitoring and Control Sys (TMACS) Acceptance Test Procedure

    SciTech Connect

    WANDLING, R.R.

    1999-11-08

    The purpose of this document is to describe tests performed to validate Revision 11.2 of the TMACS Monitor and Control System (TMCACS) and verify that the software functions as intended by design. The tests will be performed on the development system. The software to be tested is the TMACS knowledge bases (KB) and the I/O driver/services. The development system will not be talking to field equipment; instead, the field equipment is simulated using emulators or multiplexers in the lab.

  13. Firefighters' communication transceiver test plan

    NASA Technical Reports Server (NTRS)

    Wallace, R. J.

    1984-01-01

    The requirements for the operational testing of the firefighters communication transceiver were identified. The major concerns centered around the integrity and reliability of the firefighter/microphone interface. The major concern about the radio hardware was that it be intrinsically safe in hazardous atmospheres and that the system not interfere with the fit or facial seal of self-contained breathing apparatus (SCBA). The greatest concern for operational testing purposes as the reliability and clarity of the line of communication between the firefighter and those on the fireground with whom he must maintain contact. A desire to test any units developed in both training exercises and in real responses to hazardous material incidents was expressed. It is felt that a VOX-microphone built into the SCBA facemask gives the best performance. A voice-pickup product device which combines a bone conduction microphone and a speaker into a single ear mounted unit is examined.

  14. MAC mini acceptance test procedure, software Version 3.0

    SciTech Connect

    Russell, V.K.

    1994-10-17

    The K Basins Materials Accounting (MAC) programs had some major improvements made to it to organize the main-tables by Location, Canister, and Material. This ATP describes how the code was to be tested to verify its correctness.

  15. CSI computer system/remote interface unit acceptance test results

    NASA Technical Reports Server (NTRS)

    Sparks, Dean W., Jr.

    1992-01-01

    The validation tests conducted on the Control/Structures Interaction (CSI) Computer System (CCS)/Remote Interface Unit (RIU) is discussed. The CCS/RIU consists of a commercially available, Langley Research Center (LaRC) programmed, space flight qualified computer and a flight data acquisition and filtering computer, developed at LaRC. The tests were performed in the Space Structures Research Laboratory (SSRL) and included open loop excitation, closed loop control, safing, RIU digital filtering, and RIU stand alone testing with the CSI Evolutionary Model (CEM) Phase-0 testbed. The test results indicated that the CCS/RIU system is comparable to ground based systems in performing real-time control-structure experiments.

  16. Redstone Test Stand Accepted Into National Register of Historical Places

    NASA Technical Reports Server (NTRS)

    1976-01-01

    On October 02, 1976, Marshall Space Flight Center's (MSFC) Redstone test stand was received into the National Registry of Historical Places. Photographed in front of the Redstone test stand along with their wives are (left to right), Madison County Commission Chairman James Record, Dr. William R. Lucas, MSFC Center Director from June 15, 1974 until July 3, 1986, (holding certificate), Ed, Buckbee, Space and Rocket Center Director; Harvie Jones, Huntsville Architect; Dick Smith; and Joe Jones.

  17. Acceptance Test Procedure: SY101 air pallet system

    SciTech Connect

    Koons, B.M.

    1995-05-30

    The purpose of this test procedure is to verify that the system(s) procured to load the SY-101 Mitigation Test Pump package fulfills its functional requirements. It will also help determine the man dose expected due to handling of the package during the actual event. The scope of this procedure focuses on the ability of the air pallets and container saddles to carry the container package from the new 100 foot concrete pad into 2403-WD where it will be stored awaiting final disposition. This test attempts to simulate the actual event of depositing the SY-101 hydrogen mitigation test pump into the 2403-WD building. However, at the time of testing road modifications required to drive the 100 ton trailer into CWC were not performed. Therefore a flatbed trailer will be use to transport the container to CWC. The time required to off load the container from the 100 ton trailer will be recorded for man dose evaluation on location. The cranes used for this test will also be different than the actual event. This is not considered to be an issue due to minimal effects on man dose.

  18. KSC 50-MHz Doppler Radar Wind Profiler (DRWP) Operational Acceptance Test (OAT) Report

    NASA Technical Reports Server (NTRS)

    Barbre, Robert E.

    2015-01-01

    This report documents analysis results of the Kennedy Space Center updated 50-MHz Doppler Radar Wind Profiler (DRWP) Operational Acceptance Test (OAT). This test was designed to demonstrate that the new DRWP operates in a similar manner to the previous DRWP for use as a situational awareness asset for mission operations at the Eastern Range to identify rapid changes in the wind environment that weather balloons cannot depict. Data examination and two analyses showed that the updated DRWP meets the specifications in the OAT test plan and performs at least as well as the previous DRWP. Data examination verified that the DRWP provides complete profiles every five minutes from 1.8-19.5 km in vertical increments of 150 m. Analysis of 5,426 wind component reports from 49 concurrent DRWP and balloon profiles presented root mean square (RMS) wind component differences around 2.0 m/s. The DRWP's effective vertical resolution (EVR) was found to be 300 m for both the westerly and southerly wind component, which the best EVR possible given the DRWP's vertical sampling interval. A third analysis quantified the sensitivity to rejecting data that do not have adequate signal by assessing the number of first-guess propagations at each altitude. This report documents the data, quality control procedures, methodology, and results of each analysis. It also shows that analysis of the updated DRWP produced results that were at least as good as the previous DRWP with proper rationale. The report recommends acceptance of the updated DRWP for situational awareness usage as per the OAT's intent.

  19. SU-E-P-46: Clinical Acceptance Testing and Implementation of a Portable CT Unit

    SciTech Connect

    LaFrance, M; Marsh, S; Hicks, R; O’Donnell-Moran, G

    2015-06-15

    Purpose: Planning for the first installation in New England of a new portable CT unit to be used in the Operating Room required the integration of many departments including Surgery, Neurosurgery, Information Services, Clinical Engineering, Radiology and Medical Physics/Radiation Safety. Acceptance testing and the quality assurance procedures were designed to optimize image quality and patient and personnel radiation exposure. Methods: The vendor’s protocols were tested using the CT Dosimetry phantoms. The system displayed the CTDIw instead of the CTDIvol while testing the unit. Radiation exposure was compared to existing CT scanners from installed CT units throughout the facility. Brainlab measures all 4 periphery slots on the CT Dosimetry phantom. The ACR measures only the superior slot for the periphery measurement. A comprehensive radiation survey was also performed for several locations. Results: The CTDIvol measurements were comparable for the following studies: brain, C-Spine, and sinuses. However, the mobile CT measurements were slightly higher than other CT units but within acceptable tolerance if measured using the ACR method.Based on scatter measurements, it was determined if any personnel were to stay in the OR Suite during image acquisition that the appropriate lead apron and thyroid shields had to be worn.In addition, to reduce unnecessary scatter, there were two mobile 6 foot wide shields (1/16″ lead equivalent) available to protect personnel in the room and adjacent areas. Conclusion: Intraoperative CT provides the physician new opportunities for evaluation of the progression of surgical resections and device placement at the cost of increasing the amount of trained personnel required to perform this procedure. It also brings with it challenges to keep the radiation exposure to the patients and staff within reasonable limits.

  20. MAC mini acceptance test procedures, software Version 3.3

    SciTech Connect

    Russell, V.K.

    1994-10-17

    The K Basins Materials Accounting (MAC) programs had some improvements made to it to to change slightly the access authorized users had to the modification of critical data. This ATP describes how the code was to be tested to verify its correctness.

  1. Public acceptance and real testing of a nuclear repository

    SciTech Connect

    Brotzen, O.

    1995-12-31

    A local referendum and national polls show predominant distrust of the current disposal concept for spent nuclear fuel in Sweden. Plain neglect of in-place testing and monitoring of repository performance may be a contributing factor. The long periods of time involved in safe disposal call for thorough study of the potential and limitations of accelerated tests. The variation in some time involved in safe disposal call for thorough study of the potential and limitations of accelerated tests. The variation in some rate-determining factors attainable in an open repository suggests that results may be obtained which after backfilling would need periods of time comparable to those required for decay of the most harmful, strongly sorbed radionuclides. Focus should be on the isolation and containment of radionuclides in the accessible nearfield, rather than on nuclide release and transport through the inaccessible farfield. Tentative approaches are outlined, regarding nearfield groundwater control and barrier performance, and the local geochemical record, for decisions before excavations start, before development of disposal areas in a repository, and before emplacement of spent fuel, and also for monitoring performance thereafter. All tests should provide input to a strict and public licensing procedure, which ensures that no phase in disposal can be seen as a point of no return endangering future generations.

  2. WRAP low level waste restricted waste management (LLW RWM) glovebox acceptance test report

    SciTech Connect

    Leist, K.J.

    1997-11-24

    On April 22, 1997, the Low Level Waste Restricted Waste Management (LLW RWM) glovebox was tested using acceptance test procedure 13027A-87. Mr. Robert L. Warmenhoven served as test director, Mr. Kendrick Leist acted as test operator and test witness, and Michael Lane provided miscellaneous software support. The primary focus of the glovebox acceptance test was to examine glovebox control system interlocks, operator Interface Unit (OIU) menus, alarms, and messages. Basic drum port and lift table control sequences were demonstrated. OIU menus, messages, and alarm sequences were examined, with few exceptions noted. Barcode testing was bypassed, due to the lack of installed equipment as well as the switch from basic reliance on fixed bar code readers to the enhanced use of portable bar code readers. Bar code testing was completed during performance of the LLW RWM OTP. Mechanical and control deficiencies were documented as Test Exceptions during performance of this Acceptance Test. These items are attached as Appendix A to this report.

  3. TDS and BMT for CASES ADF (ADF RAMS), acceptance test

    NASA Technical Reports Server (NTRS)

    Davis, Hugh W.

    1992-01-01

    The Controls, Astrophysics, and Structures Experiment (CASES) is a proposed experiment to collect x ray images of the galactic center and solar disk with unprecedented resolution. This requires precision pointing and suppression of vibrations in the long, flexible structure that comprises the 32-m x ray telescope optical bench. Two separate electro-optical sensors systems are provided for the ground test facility (GTF). The Boom Motion Tracker (BMT) measures eigenvector data for post-mission use in system identification. The Tip Displacement Sensor (TDS) measures boom tip position and is used as feedback for the closed-loop control system that stabilizes the boom. The deployment and testing of the BMT and TDS systems is summarized.

  4. Summary of Tray Pack Field Acceptance Tests and Results

    DTIC Science & Technology

    1988-05-01

    test was conducted during 18-22 September 1984 at Fort Bragg, Fayetteville, NC. Eighteen items were tested since Turkey/Gravy, Chocolate Cake and...5.27 [3] (7.14) 5.54 [3] (7.08) 6.52 A (6.78) Chocolate Cake 4.63 R (6.68) 4 4.83 R (7.46) Egg Loaf w/Cheese 2.95 R (4.82) 3.33 R (5.24) 4.09 R (4.01...6.83) 7.3R A (6.60) Chocolate Pudding 5.52 [1] A (6.57) 5.49 [3) (6.64) 4.71 R (6.65) Turkey Sl w/Gravy [4) [4) 6.85 A Blueberry Cake [4] [4] 6.51 A

  5. Solar panel acceptance testing using a pulsed solar simulator

    NASA Technical Reports Server (NTRS)

    Hershey, T. L.

    1977-01-01

    Utilizing specific parameters as area of an individual cell, number in series and parallel, and established coefficient of current and voltage temperature dependence, a solar array irradiated with one solar constant at AMO and at ambient temperature can be characterized by a current-voltage curve for different intensities, temperatures, and even different configurations. Calibration techniques include: uniformity in area, depth and time, absolute and transfer irradiance standards, dynamic and functional check out procedures. Typical data are given for individual cell (2x2 cm) to complete flat solar array (5x5 feet) with 2660 cells and on cylindrical test items with up to 10,000 cells. The time and energy saving of such testing techniques are emphasized.

  6. Design, Test, and Acceptance Criteria for Helicopter Transparent Enclosures

    DTIC Science & Technology

    1978-11-01

    Visibility Data From Ballistic Tests . . .*. . 212 37 Dispersion of Penetrations in Witness Sheet . 219 38 Foam Penetration Data . . . . . . . . . o 224 39...light scattered and therefore lost in passage through the material. To provide a frame of reference, a material with 30% haze would be considered...polycarbonate materials were superior to glass in resisting impinge- ment abrasion; apparently due to ductility of the coating which minimized spallation

  7. Advanced Materials Laboratory User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Orndoff, Evelyne

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the Advanced Materials Laboratory. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  8. Light Duty Utility Arm Software Test Plan

    SciTech Connect

    Kiebel, G.R.

    1995-12-18

    This plan describes how validation testing of the software will be implemented for the integrated control and data acquisition system of the Light Duty Utility Arm System (LDUA). The purpose of LDUA software validation testing is to demonstrate and document that the LDUA software meets its software requirements specification.

  9. MBA acceptance test procedures, software Version 1.4

    SciTech Connect

    Mullaney, J.E.; Russell, V.K.

    1994-10-17

    The Mass Balance Program (MBA) is an adjunct to the Materials Accounting database system, Version 3.4. MBA was written to equip the personnel performing K-Basin encapsulation tasks with a conservative estimate of accumulated sludge during the processing of canisters into and out of the chute. The K Basins Materials Balance programs had some minor improvements made to it to feedback the chute processing status to the operator better. This ATP describes how the code was to be tested to verify its correctness.

  10. Test report for run-in acceptance testing of hydrogen mitigation test pump-2

    SciTech Connect

    Brewer, A.K.; Kolowith, R.

    1995-01-01

    This document provides the results of the run-in test of the replacement mixer pump for the Tank 241-SY-101. The test was conducted at the 400 Area MASF facility between August 12 and September 29, 1994. The report includes findings, analysis, recommendations, and corrective actions taken.

  11. 14 CFR 135.301 - Crewmember: Tests and checks, grace provisions, training to accepted standards.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... provisions, training to accepted standards. 135.301 Section 135.301 Aeronautics and Space FEDERAL AVIATION...: CERTIFICATION AND OPERATIONS OPERATING REQUIREMENTS: COMMUTER AND ON DEMAND OPERATIONS AND RULES GOVERNING..., grace provisions, training to accepted standards. (a) If a crewmember who is required to take a test...

  12. 14 CFR 135.301 - Crewmember: Tests and checks, grace provisions, training to accepted standards.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... provisions, training to accepted standards. 135.301 Section 135.301 Aeronautics and Space FEDERAL AVIATION...: CERTIFICATION AND OPERATIONS OPERATING REQUIREMENTS: COMMUTER AND ON DEMAND OPERATIONS AND RULES GOVERNING..., grace provisions, training to accepted standards. (a) If a crewmember who is required to take a test...

  13. 14 CFR 135.301 - Crewmember: Tests and checks, grace provisions, training to accepted standards.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... provisions, training to accepted standards. 135.301 Section 135.301 Aeronautics and Space FEDERAL AVIATION...: CERTIFICATION AND OPERATIONS OPERATING REQUIREMENTS: COMMUTER AND ON DEMAND OPERATIONS AND RULES GOVERNING..., grace provisions, training to accepted standards. (a) If a crewmember who is required to take a test...

  14. 14 CFR 135.301 - Crewmember: Tests and checks, grace provisions, training to accepted standards.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... provisions, training to accepted standards. 135.301 Section 135.301 Aeronautics and Space FEDERAL AVIATION...: CERTIFICATION AND OPERATIONS OPERATING REQUIREMENTS: COMMUTER AND ON DEMAND OPERATIONS AND RULES GOVERNING..., grace provisions, training to accepted standards. (a) If a crewmember who is required to take a test...

  15. Project B610 process control configuration acceptance test procedure

    SciTech Connect

    Silvan, G.R.

    1994-09-20

    The purpose of this test is to verify the Westinghouse configuration of the MICON A/S Distributed Control System for project B610. The following will be verified: proper assignment and operation of all field inputs to and outputs from the MICON Termination panels; proper operation of all display data on the operator`s console; proper operation of all required alarms; and proper operation of all required interlocks. The MICON A/S control system is configured to replace all the control, indication, and alarm panels now located in the Power Control Room. Nine systems are covered by this control configuration, 2736-ZB HVAC, 234-5Z HVAC, Process Vacuum, Dry Air, 291-Z Closed Loop Cooling, Building Accelerometer, Evacuation Siren, Stack CAMs, and Fire. The 2736-ZB HVAC system consists of the ventilation controls for 2736-ZB and 2736-Z as well as alarms for the emergency generators and 232-Z. The 234-5Z HVAC system is the ventilation controls for 235-5Z and 236-Z buildings. Process Vacuum covers the controls for the 26 inch vacuum system. Dry Air covers the controls for the steam and electric air dryers. The 291-Z Closed Loop Cooling system consists of the status indications and alarms for the 291-Z compressor and vacuum pump closed loop cooling system. The rest of closed loop cooling was tested earlier. The Building Accelerometer system consists of the status indications for the two seismic system accelerometers. The Evacuation Siren system includes the controls for the evacuation and take cover sirens. Stack CAMs cover the alarms for the various building ventilation stack continuous air monitors. Finally, the Fire system covers the various fire alarms now located in Room 321-A.

  16. Phased Startup Initiative Phases 3 and 4 Test Plan and Test Specification (OCRWM)

    SciTech Connect

    PITNER, A.L.

    2000-02-28

    Construction for the Spent Nuclear Fuel (SNF) Project facilities is continuing per the Level III Baseline Schedule, and installation of the Fuel Retrieval System (FRS) and Integrated Water Treatment System (IWTS) in K West Basin is now complete. In order to accelerate the project, a phased start up strategy to initiate testing of the FRS and IWTS early in the overall project schedule was proposed (Williams 1999). Wilkinson (1999) expands the definition of the original proposal into four functional testing phases of the Phased Startup Initiative (PSI). Phases 1 and 2 are based on performing functional tests using dummy fuel. These tests are described in separate planning documents. This test plan provides overall guidance for Phase 3 and 4 tests, which are performed using actual irradiated N fuel assemblies. The overall objective of the Phase 3 and 4 testing is to verify how the FRS and IWTS respond while processing actual fuel. Conducting these tests early in the project schedule will allow identification and resolution of equipment and process problems before they become activities on the start-up critical path. The specific objectives of this test plan are to: (1) Define the test scope for the FRS and IWTS; (2) Provide detailed test requirements that can be used to write the specific test procedures; (3) Define data required and measurements to be taken. Where existing methods to obtain these do not exist, enough detail will be provided to define required additional equipment; and (4) Define specific test objectives and acceptance criteria.

  17. Acceptance Test Report for the high pressure water jet system canister cleaning fixture

    SciTech Connect

    Burdin, J.R.

    1995-10-25

    This Acceptance Test confirmed the test results and recommendations, documented in WHC-SD-SNF-DTR-001, Rev. 0 Development Test Report for the High Pressure Water Jet System Nozzles, for decontaminating empty fuel canisters in KE-Basin. Optimum water pressure, water flow rate, nozzle size and overall configuration were tested

  18. Acceptance of Genetic Testing in a General Population: Age, Education and Gender Differences.

    ERIC Educational Resources Information Center

    Aro, A. R.; Hakonen, A.; Hietala, M.; Lonnqvist, J.; Niemela, P.; Peltonen, L; Aula, P.

    1997-01-01

    Effects of age, education, and gender on acceptance of genetic testing were studied. Finnish participants responded to a questionnaire presenting reasons for and against genetic testing (N=1,967). Intentions to take genetic tests, worries, and experience of genetic test or hereditary disease were also assessed. Results are presented and discussed.…

  19. DEEP VADOSE ZONE TREATABILITY TEST PLAN

    SciTech Connect

    GB CHRONISTER; MJ TRUEX

    2009-07-02

    {sm_bullet} Treatability test plan published in 2008 {sm_bullet} Outlines technology treatability activities for evaluating application of in situ technologies and surface barriers to deep vadose zone contamination (technetium and uranium) {sm_bullet} Key elements - Desiccation testing - Testing of gas-delivered reactants for in situ treatment of uranium - Evaluating surface barrier application to deep vadose zone - Evaluating in situ grouting and soil flushing

  20. Alternatives to animal testing: research, trends, validation, regulatory acceptance.

    PubMed

    Huggins, Jane

    2003-01-01

    Current trends and issues in the development of alternatives to the use of animals in biomedical experimentation are discussed in this position paper. Eight topics are considered and include refinement of acute toxicity assays; eye corrosion/irritation alternatives; skin corrosion/irritation alternatives; contact sensitization alternatives; developmental/reproductive testing alternatives; genetic engineering (transgenic) assays; toxicogenomics; and validation of alternative methods. The discussion of refinement of acute toxicity assays is focused primarily on developments with regard to reduction of the number of animals used in the LD(50) assay. However, the substitution of humane endpoints such as clinical signs of toxicity for lethality in these assays is also evaluated. Alternative assays for eye corrosion/irritation as well as those for skin corrosion/irritation are described with particular attention paid to the outcomes, both successful and unsuccessful, of several validation efforts. Alternative assays for contact sensitization and developmental/reproductive toxicity are presented as examples of methods designed for the examination of interactions between toxins and somewhat more complex physiological systems. Moreover, genetic engineering and toxicogenomics are discussed with an eye toward the future of biological experimentation in general. The implications of gene manipulation for research animals, specifically, are also examined. Finally, validation methods are investigated as to their effectiveness, or lack thereof, and suggestions for their standardization and improvement, as well as implementation are reviewed.

  1. Specialized Environmental Chamber Test Complex: User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Montz, Michael E.

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the Specialized Environmental Test Complex. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  2. Surface stability test plan for protective barriers

    SciTech Connect

    Ligotke, M.W.

    1989-01-01

    Natural-material protective barriers for long-term isolation of buried waste have been identified as integral components of a plan to isolate a number of Hanford defense waste sites. Standards currently being developed for internal and external barrier performance will mandate a barrier surface layer that is resistant to the eolian erosion processes of wind erosion (deflation) and windborne particle deposition (formation of sand dunes). Thus, experiments are needed to measure rates of eolian erosion processes impacting those surfaces under different surface and climatological conditions. Data from these studies will provide information for use in the evaluation of selected surface layers as a means of providing stable cover over waste sites throughout the design life span of protective barriers. The multi-year test plan described in this plan is directed at understanding processes of wind erosion and windborne particle deposition, providing measurements of erosion rates for models, and suggesting construction materials and methods for reducing the effect of long-term eolian erosion on the barrier. Specifically, this plan describes possible methods to measure rates of eolian erosion, including field and laboratory procedure. Advantages and disadvantages of laboratory (wind tunnel) tests are discussed, and continued wind tunnel tests are recommended for wind erosion studies. A comparison between field and wind tunnel erosive forces is discussed. Plans for testing surfaces are described. Guidance is also presented for studying the processes controlling sand dune and blowout formation. 24 refs., 7 figs., 3 tabs.

  3. Acceptance Test Procedure for AMS-4 Continuous Air Monitors (CAM) at 241-AN Exhausters

    SciTech Connect

    FREEMAN, R.D.

    1999-09-22

    This supporting document provides detailed instruction for ensuring the existing alarms and interlocks are in an acceptable condition prior to performing the functional test of the AMS-4 installation.

  4. Daniel K. Inouye Solar Telescope: integration, testing, and commissioning planning

    NASA Astrophysics Data System (ADS)

    Craig, Simon; Gonzales, Kerry; Hubbard, Robert P.; Liang, Chen; Kneale, Ruth A.; McBride, William R.; Sekulic, Predrag; Williams, Timothy R.

    2016-08-01

    The Daniel K. Inouye Solar Telescope (DKIST) has been in its construction phase since 2010, anticipating the onset of the integration, test, and commissioning (IT&C) phase in early 2017, and the commencement of science verification in 2019. The works on Haleakala are progressing at a phenomenal rate and many of the various subsystems are either through or about to enter their Factory (or Laboratory) acceptance. The delays in obtaining site planning permissions, while a serious issue for Project Management, has allowed the sub-systems to develop well ahead of their required delivery to site. We have benefited from the knowledge that many sub-systems will be on site and ready for integration well before affecting the critical path. Opportunities have been presented for additional laboratory/factory testing which, while not free, significantly reduce the risks of potential delays and rework on site. From the perspective of IT&C this has provided an opportunity to develop the IT&C plans and schedules free from the pressures of imminent deployment. In this paper we describe the ongoing planning of the Integration, Testing and Commissioning (IT&C) phase of the project in particular the detailed planning phase that we are currently developing.

  5. AGR-1 Irradiation Experiment Test Plan

    SciTech Connect

    John T. Maki

    2009-10-01

    This document presents the current state of planning for the AGR-1 irradiation experiment, the first of eight planned irradiations for the Advanced Gas Reactor (AGR) Fuel Development and Qualification Program. The objectives of the AGR-1 experiment are: 1. To gain experience with multi-capsule test train design, fabrication, and operation with the intent to reduce the probability of capsule or test train failure in subsequent irradiation tests. 2. To irradiate fuel produced in conjunction with the AGR fuel process development effort. 3. To provide data that will support the development of an understanding of the relationship between fuel fabrication processes, fuel product properties, and irradiation performance. In order to achieve the test objectives, the AGR-1 experiment will be irradiated in the B-10 position of the Advanced Test Reactor (ATR) at the Idaho National Laboratory (INL). The test will contain six independently controlled and monitored capsules. Each capsule will contain a single type, or variant, of the AGR coated fuel. The irradiation is planned for about 700 effective full power days (approximately 2.4 calendar years) with a time-averaged, volume-average temperature of approximately 1050 °C. Average fuel burnup, for the entire test, will be greater than 17.7 % FIMA, and the fuel will experience fast neutron fluences between 2.4 and 4.5 x 1025 n/m2 (E>0.18 MeV).

  6. 3D augmented reality for improving social acceptance and public participation in wind farms planning

    NASA Astrophysics Data System (ADS)

    Grassi, S.; Klein, T. M.

    2016-09-01

    Wind energy is one of the most important source of renewable energy characterized by a significant growth in the last decades and giving a more and more relevant contribution to the energy supply. One of the main disadvantages of a faster integration of wind energy into the energy mix is related to the visual impact of wind turbines on the landscape. In addition, the siting of new massive infrastructures has the potential to threaten a community's well-being if new projects are perceived being unfair. The public perception of the impact of wind turbines on the landscape is also crucial for their acceptance. The implementation of wind energy projects is hampered often because of a lack of planning or communication tools enabling a more transparent and efficient interaction between all stakeholders involved in the projects (i.e. developers, local communities and administrations, NGOs, etc.). Concerning the visual assessment of wind farms, a critical gap lies in effective visualization tools to improve the public perception of alternative wind turbines layouts. In this paper, we describe the advantages of a 3D dynamical and interactive visualization platform for an augmented reality to support wind energy planners in order to enhance the social acceptance of new wind energy projects.

  7. Integrated development and testing plan for the plutonium immobilization project

    SciTech Connect

    Kan, T.

    1998-07-01

    This integrated plan for the DOE Office of Fissile Materials Disposition (MD) describes the technology development and major project activities necessary to support the deployment of the immobilization approach for disposition of surplus weapons-usable plutonium. The plan describes details of the development and testing (D&T) tasks needed to provide technical data for design and operation of a plutonium immobilization plant based on the ceramic can-in-canister technology (''Immobilization Fissile Material Disposition Program Final Immobilization Form Assessment and Recommendation'', UCRL-ID-128705, October 3, 1997). The plan also presents tasks for characterization and performance testing of the immobilization form to support a repository licensing application and to develop the basis for repository acceptance of the plutonium form. Essential elements of the plant project (design, construction, facility activation, etc.) are described, but not developed in detail, to indicate how the D&T results tie into the overall plant project. Given the importance of repository acceptance, specific activities to be conducted by the Office of Civilian Radioactive Waste Management (RW) to incorporate the plutonium form in the repository licensing application are provided in this document, together with a summary of how immobilization D&T activities provide input to the license activity. The ultimate goal of the Immobilization Project is to develop, construct, and operate facilities that will immobilize from about 18 to 50 tonnes (MT) of U.S. surplus weapons usable plutonium materials in a manner that meets the ''spent fuel'' standard (Fissile Materials Storage and Disposition Programmatic Environmental Impact Statement Record of Decision, ''Storage and Disposition Final PEIS'', issued January 14, 1997, 62 Federal Register 3014) and is acceptable for disposal in a geologic repository. In the can-in-canister technology, this is accomplished by encapsulating the plutonium

  8. 14 CFR 125.293 - Crewmember: Tests and checks, grace provisions, accepted standards.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AIRCRAFT Flight Crewmember Requirements § 125.293 Crewmember: Tests and checks, grace provisions, accepted standards. (a) If a crewmember who is required to take a test or a flight check under this part completes the test or flight check in the calendar month before or after the calendar month in which it...

  9. 14 CFR 125.293 - Crewmember: Tests and checks, grace provisions, accepted standards.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AIRCRAFT Flight Crewmember Requirements § 125.293 Crewmember: Tests and checks, grace provisions, accepted standards. (a) If a crewmember who is required to take a test or a flight check under this part completes the test or flight check in the calendar month before or after the calendar month in which it...

  10. 14 CFR 125.293 - Crewmember: Tests and checks, grace provisions, accepted standards.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AIRCRAFT Flight Crewmember Requirements § 125.293 Crewmember: Tests and checks, grace provisions, accepted standards. (a) If a crewmember who is required to take a test or a flight check under this part completes the test or flight check in the calendar month before or after the calendar month in which it...

  11. 14 CFR 125.293 - Crewmember: Tests and checks, grace provisions, accepted standards.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AIRCRAFT Flight Crewmember Requirements § 125.293 Crewmember: Tests and checks, grace provisions, accepted standards. (a) If a crewmember who is required to take a test or a flight check under this part completes the test or flight check in the calendar month before or after the calendar month in which it...

  12. 14 CFR 125.293 - Crewmember: Tests and checks, grace provisions, accepted standards.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AIRCRAFT Flight Crewmember Requirements § 125.293 Crewmember: Tests and checks, grace provisions, accepted standards. (a) If a crewmember who is required to take a test or a flight check under this part completes the test or flight check in the calendar month before or after the calendar month in which it...

  13. Acceptance test report for W-030 monitor and control system (MCS) software

    SciTech Connect

    Finch, B.G.

    1996-05-06

    This report documents the test performed under `Acceptance Test Procedure WHC-SD-W030-ATP-011, Rev. 0`, for `Project W-030 Tank Farm Ventilation Upgrade`. This report covers testing of the Software Control Logic for the MICON Monitoring and Control System (MCS).

  14. 77 FR 51880 - Requirements for Maintenance of Inspections, Tests, Analyses, and Acceptance Criteria

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-28

    ... COMMISSION 10 CFR Parts 2 and 52 RIN 3150-AI77 Requirements for Maintenance of Inspections, Tests, Analyses... regulations related to verification of nuclear power plant construction activities through inspections, tests... determining that inspections, tests, or analyses were performed as required, or that acceptance criteria...

  15. 46 CFR 159.007-5 - Production inspections and tests: Application for acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Production Inspection and Tests of Approved Equipment and Materials § 159.007-5 Production inspections and...) Is accepted by the Commandant for approval inspections and tests of the equipment or material under... 46 Shipping 6 2011-10-01 2011-10-01 false Production inspections and tests: Application...

  16. 46 CFR 159.007-5 - Production inspections and tests: Application for acceptance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Production Inspection and Tests of Approved Equipment and Materials § 159.007-5 Production inspections and...) Is accepted by the Commandant for approval inspections and tests of the equipment or material under... 46 Shipping 6 2013-10-01 2013-10-01 false Production inspections and tests: Application...

  17. 46 CFR 159.007-5 - Production inspections and tests: Application for acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Production Inspection and Tests of Approved Equipment and Materials § 159.007-5 Production inspections and...) Is accepted by the Commandant for approval inspections and tests of the equipment or material under... 46 Shipping 6 2010-10-01 2010-10-01 false Production inspections and tests: Application...

  18. 46 CFR 159.007-5 - Production inspections and tests: Application for acceptance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Production Inspection and Tests of Approved Equipment and Materials § 159.007-5 Production inspections and...) Is accepted by the Commandant for approval inspections and tests of the equipment or material under... 46 Shipping 6 2014-10-01 2014-10-01 false Production inspections and tests: Application...

  19. 46 CFR 159.007-5 - Production inspections and tests: Application for acceptance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Production Inspection and Tests of Approved Equipment and Materials § 159.007-5 Production inspections and...) Is accepted by the Commandant for approval inspections and tests of the equipment or material under... 46 Shipping 6 2012-10-01 2012-10-01 false Production inspections and tests: Application...

  20. Test, Control and Monitor System maintenance plan

    NASA Technical Reports Server (NTRS)

    Buehler, David P.; Lougheed, M. J.

    1993-01-01

    The maintenance requirements for Test, Control, and Monitor System (TCMS) and the method for satisfying these requirements prior to First Need Date (FND) of the last TCMS set are described. The method for satisfying maintenance requirements following FND of the last TCMS set will be addressed by a revision to this plan. This maintenance plan serves as the basic planning document for maintenance of this equipment by the NASA Payloads Directorate (CM) and the Payload Ground Operations Contractor (PGOC) at KSC. The terms TCMS Operations and Maintenance (O&M), Payloads Logistics, TCMS Sustaining Engineering, Payload Communications, and Integrated Network Services refer to the appropriate NASA and PGOC organization. For the duration of their contract, the Core Electronic Contractor (CEC) will provide a Set Support Team (SST). One of the primary purposes of this team is to help NASA and PGOC operate and maintain TCMS. It is assumed that SST is an integral part of TCMS O&M. The purpose of this plan is to describe the maintenance concept for TCMS hardware and system software in order to facilitate activation, transition planning, and continuing operation. When software maintenance is mentioned in this plan, it refers to maintenance of TCMS system software.

  1. Vibroacoustic test plan evaluation: Parameter variation study

    NASA Technical Reports Server (NTRS)

    Stahle, C. V.; Gongloef, H. R.

    1976-01-01

    Statistical decision models are shown to provide a viable method of evaluating the cost effectiveness of alternate vibroacoustic test plans and the associated test levels. The methodology developed provides a major step toward the development of a realistic tool to quantitatively tailor test programs to specific payloads. Testing is considered at the no test, component, subassembly, or system level of assembly. Component redundancy and partial loss of flight data are considered. Most and probabilistic costs are considered, and incipient failures resulting from ground tests are treated. Optimums defining both component and assembly test levels are indicated for the modified test plans considered. modeling simplifications must be considered in interpreting the results relative to a particular payload. New parameters introduced were a no test option, flight by flight failure probabilities, and a cost to design components for higher vibration requirements. Parameters varied were the shuttle payload bay internal acoustic environment, the STS launch cost, the component retest/repair cost, and the amount of redundancy in the housekeeping section of the payload reliability model.

  2. Acceptance Plan and Performance Measurement Methodology for the ITER Cryoline System

    NASA Astrophysics Data System (ADS)

    Badgujar, S.; Bonneton, M.; Shah, N.; Chalifour, M.; Chang, H.-S.; Fauve, E.; Forgeas, A.; Navion-Maillot, N.; Sarkar, B.

    The cryoline (CL) systemof ITER consists of a complex network of vacuum insulated multi and single process pipe lines distributed over three different areas with a total length of about 5 km. The thermal performance of the CL system will be measured during the final acceptance tests using the ITER cryoplant and cryo-distribution (CD) infrastructure. The method proposed is based on temperature measurementsof a small calibrated cryogenic helium flow through lines. Thecryoplant will be set to establish constant pressure and temperature whereas dedicated heater and valves in the CD will be used to generate stable mass flow rate.

  3. Dynamic simulations for preparing the acceptance test of JT-60SA cryogenic system

    NASA Astrophysics Data System (ADS)

    Cirillo, R.; Hoa, C.; Michel, F.; Poncet, J. M.; Rousset, B.

    2016-12-01

    Power generation in the future could be provided by thermo-nuclear fusion reactors like tokamaks. There inside, the fusion reaction takes place thanks to the generation of plasmas at hundreds of millions of degrees that must be confined magnetically with superconductive coils, cooled down to around 4.5 K. Within this frame, an experimental tokamak device, JT-60SA is currently under construction in Naka (Japan). The plasma works cyclically and the coil system is subject to pulsed heat loads. In order to size the refrigerator close to the average power and hence optimizing investment and operational costs, measures have to be taken to smooth the heat load. Here we present a dynamic model of the JT-60SA's Auxiliary Cold box (ACB) for preparing the acceptance tests of the refrigeration system planned in 2016 in Naka. The aim of this study is to simulate the pulsed load scenarios using different process controls. All the simulations have been performed with EcosimPro® and the associated cryogenic library: CRYOLIB.

  4. Test Plan - Solids Accumulation Scouting Studies

    SciTech Connect

    Duignan, M. R.; Steeper, T. J.; Steimke, J. L.; Fowley, M. D.

    2012-05-10

    This plan documents the highlights of the Solids Accumulations Scouting Studies test; a project, from Washington River Protection Solutions (WRPS), that began on February 1, 2012. During the last 12 weeks considerable progress has been made to design and plan methods that will be used to estimate the concentration and distribution of heavy fissile solids in accumulated solids in the Hanford double-shell tank (DST) 241-AW-105 (AW-105), which is the primary goal of this task. This DST will be one of the several waste feed delivery staging tanks designated to feed the Pretreatment Facility (PTF) of the Waste Treatment and Immobilization Plant (WTP). Note that over the length of the waste feed delivery mission AW-105 is currently identified as having the most fill empty cycles of any DST feed tanks, which is the reason for modeling this particular tank. At SRNL an existing test facility, the Mixing Demonstration Tank, which will be modified for the present work, will use stainless steel particles in a simulant that represents Hanford waste to perform mock staging tanks transfers that will allow solids to accumulate in the tank heel. The concentration and location of the mock fissile particles will be measured in these scoping studies to produce information that will be used to better plan larger scaled tests. Included in these studies is a secondary goal of developing measurement methods to accomplish the primary goal. These methods will be evaluated for use in the larger scale experiments. Included in this plan are the several pretest activities that will validate the measurement techniques that are currently in various phases of construction. Aspects of each technique, e.g., particle separations, volume determinations, topographical mapping, and core sampling, have been tested in bench-top trials, as discussed herein, but the actual equipment to be employed during the full test will need evaluation after fabrication and integration into the test facility.

  5. Tests to Help Plan Opportunity Moves

    NASA Technical Reports Server (NTRS)

    2005-01-01

    Rover engineers check how a test rover moves in material chosen to simulate some difficult Mars driving conditions. The scene is inside the In-Situ Instrument Laboratory at NASA's Jet Propulsion Laboratory, Pasadena, Calif. These tests in early May 2005 were designed to help plan the best way for the rover Opportunity to drive off of a soft-sand dune that the rover dug itself into the previous week. The mixture of sandy and powdery material brought in for these specific tests matched the way the soil underneath Opportunity caked onto wheels, filling the spaces between the cleats on the wheels.

  6. Halogen occultation experiment intergrated test plan

    NASA Technical Reports Server (NTRS)

    Mauldin, L. E., III; Butterfield, A. J.

    1986-01-01

    The test program plan is presented for the Halogen Occultation Experiment (HALOE) instrument, which is being developed in-house at the Langley Research Center for the Upper Atmosphere Research Satellite (UARS). This comprehensive test program was developed to demonstrate that the HALOE instrument meets its performance requirements and maintains integrity through UARS flight environments. Each component, subsystem, and system level test is described in sufficient detail to allow development of the necessary test setups and test procedures. Additionally, the management system for implementing this test program is given. The HALOE instrument is a gas correlation radiometer that measures vertical distribution of eight upper atmospheric constituents: O3, HC1, HF, NO, CH4, H2O, NO2, and CO2.

  7. Building Energy Simulation Test for Existing Homes (BESTEST-EX): Instructions for Implementing the Test Procedure, Calibration Test Reference Results, and Example Acceptance-Range Criteria

    SciTech Connect

    Judkoff, R.; Polly, B.; Bianchi, M.; Neymark, J.; Kennedy, M.

    2011-08-01

    This publication summarizes building energy simulation test for existing homes (BESTEST-EX): instructions for implementing the test procedure, calibration tests reference results, and example acceptance-range criteria.

  8. Standard-B auto grab sampler hydrogen monitoring system, Acceptance Test Report

    SciTech Connect

    Lott, D.T.

    1995-05-18

    Project W-369, Watch List Tank Hydrogen Monitors, installed a Standard-C Hydrogen Monitoring System (SHMS) on the Flammable gas waste tank AN-104. General Support Projects (8K510) was support by Test Engineering (7CH30) in the performance of the Acceptance Test Procedures (ATP) to qualify the SHMS cabinets on the waste tank. The ATP`s performance was controlled by Tank Farm work package. This completed ATP is transmitted by EDT-601748 as an Acceptance Test Report (ATR) in accordance with WHC-6-1, EP 4.2 and EP 1.12.

  9. Delinquency and Peer Acceptance in Adolescence: A Within-Person Test of Moffitt’s Hypotheses

    PubMed Central

    Rulison, Kelly L; Kreager, Derek A.; Osgood, D. Wayne

    2015-01-01

    We tested two hypotheses derived from Moffitt’s (1993) taxonomic theory of antisocial behavior, both of which are central to her explanation for the rise in delinquency during adolescence. Specifically, we tested whether persistently delinquent individuals become more accepted by their peers during adolescence and whether individuals who abstain from delinquent behavior become less accepted. Participants were 4,359 adolescents from 14 communities in the PROSPER study, which assessed friendship networks and delinquency from 6th (M = 11.8 years) to 9th (M = 15.3 years) grade. We operationalized peer acceptance as: number of nominations received (indegree centrality), attractiveness as a friend (adjusted indegree centrality), and network bridging potential (betweenness centrality) and tested the hypotheses using multilevel modeling. Contrary to Moffitt’s hypothesis, persistently delinquent youth did not become more accepted between early and middle adolescence, and although abstainers were less accepted in early adolescence, they became more accepted over time. Results were similar for boys and girls; when differences occurred, they provided no support for Moffitt’s hypotheses for boys and were opposite of her hypotheses for girls. Sensitivity analyses using alternative strategies and additional data to identify persistently delinquent adolescents produced similar results. We explore the implications of these results for Moffitt’s assertions that social mimicry of persistently antisocial adolescents leads to increases in delinquency and that social isolation leads to abstention. PMID:25243328

  10. Phase Startup Initiative Phases 3 and 4 Test Plan and Test Specification ( OCRWM)

    SciTech Connect

    PAJUNEN, A.L.; LANGEVIN, M.J.

    2000-08-07

    Construction for the Spent Nuclear Fuel (SNF) Project facilities is continuing per the Level III Baseline Schedule, and installation of the Fuel Retrieval System (FRS) and Integrated Water Treatment System (IWTS) in K West Basin is now complete. In order to accelerate the project, a phased start up strategy to initiate testing of the FRS and IWTS early in the overall project schedule was proposed (Williams 1999). Wilkinson (1999) expands the definition of the original proposal into four functional testing phases of the Phased Startup Initiative (PSI). Phases 1 and 2 are based on performing functional tests using dummy fuel. This test plan provides overall guidance for Phase 3 and 4 tests, which are performed using actual irradiated N fuel assemblies. The overall objective of the Phase 3 and 4 testing is to verify how the FRS and IWTS respond while processing actual fuel. Conducting these tests early in the project schedule will allow identification and resolution of equipment and process problems before they become activities on the start-up critical path. The specific objectives of this test plan are to: Define the Phase 3 and 4 test scope for the FRS and IWTS; Provide detailed test requirements that can be used to write the specific test procedures; Define data required and measurements to be taken. Where existing methods to obtain these do not exist, enough detail will be provided to define required additional equipment; and Define specific test objectives and acceptance criteria.

  11. GEOCHEMICAL TESTING AND MODEL DEVELOPMENT - RESIDUAL TANK WASTE TEST PLAN

    SciTech Connect

    CANTRELL KJ; CONNELLY MP

    2010-03-09

    This Test Plan describes the testing and chemical analyses release rate studies on tank residual samples collected following the retrieval of waste from the tank. This work will provide the data required to develop a contaminant release model for the tank residuals from both sludge and salt cake single-shell tanks. The data are intended for use in the long-term performance assessment and conceptual model development.

  12. Understanding Student Teachers' Behavioural Intention to Use Technology: Technology Acceptance Model (TAM) Validation and Testing

    ERIC Educational Resources Information Center

    Wong, Kung-Teck; Osman, Rosma bt; Goh, Pauline Swee Choo; Rahmat, Mohd Khairezan

    2013-01-01

    This study sets out to validate and test the Technology Acceptance Model (TAM) in the context of Malaysian student teachers' integration of their technology in teaching and learning. To establish factorial validity, data collected from 302 respondents were tested against the TAM using confirmatory factor analysis (CFA), and structural equation…

  13. Delinquency and Peer Acceptance in Adolescence: A Within-Person Test of Moffitt's Hypotheses

    ERIC Educational Resources Information Center

    Rulison, Kelly L.; Kreager, Derek A.; Osgood, D. Wayne

    2014-01-01

    We tested 2 hypotheses derived from Moffitt's (1993) taxonomic theory of antisocial behavior, both of which are central to her explanation for the rise in delinquency during adolescence. We tested whether persistently delinquent individuals become more accepted by their peers during adolescence and whether individuals who abstain from delinquent…

  14. 49 CFR 180.511 - Acceptable results of inspections and tests.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 2 2010-10-01 2010-10-01 false Acceptable results of inspections and tests. 180... results of inspections and tests. Provided it conforms with other applicable requirements of this subchapter, a tank car is qualified for use if it successfully passes the following inspections and...

  15. Tonopah Test Range closure sites revegetation plan

    SciTech Connect

    Anderson, D.C.; Hall, D.B.

    1997-05-01

    This document is a revegetation plan for long-term stabilization (revegetation) of land disturbed by activities associated with the closure of a Bomblet Pit and the Five Points Landfill. Both sites are on the Tonopah Test Range (TTR) located in south-central Nevada. This document contains general reclamation practices and procedures that will be followed during the revegetation of these sites. The revegetation procedures proposed have been developed over several years of research and include the results of reclamation trials at Area 11 and Area 19 on the Nevada Test Site (NTS), and more recently at the Double Tracks (Nellis Air Force Range) reclamation demonstration plots. In addition, the results of reclamation efforts and concurrent research efforts at the Yucca Mountain Project have been considered in the preparation of this revegetation plan.

  16. Space telescope observatory management system preliminary test and verification plan

    NASA Technical Reports Server (NTRS)

    Fritz, J. S.; Kaldenbach, C. F.; Williams, W. B.

    1982-01-01

    The preliminary plan for the Space Telescope Observatory Management System Test and Verification (TAV) is provided. Methodology, test scenarios, test plans and procedure formats, schedules, and the TAV organization are included. Supporting information is provided.

  17. Family Planning Practices Prior to the Acceptance of Tubectomy: A Study Among Women Attending a Maternity Home in Bangalore,India

    PubMed Central

    V, Srividya; Kumar, Jayanth

    2013-01-01

    Introduction: The extent of acceptance of contraceptive methods still varies within societies. Reliance on sterilisation is appearing earlier in marriage and among ever-younger ages and lower parities. Aim and Objective: To study the family planning practices adopted by women who undergo tubectomy before the acceptance of tubectomy. Material and Methods: Cross–sectional study of tubectomy acceptors who attended a corporation referral maternity home in Bangalore, India by interview method using a pre–designed a pre–tested structured questionnaire. Results: Majority 295(73.9%) of the study subjects had not practised any method of contraception before they underwent sterilisation. Increase in the education levels of the study subjects was associated with an increase in the contraceptive use (temporary methods) before they accepted tubectomy; this association was found to be statistically significant (p<0.0001). PMID:24086862

  18. Test plan for ISV laboratory-pyrolysis testing

    SciTech Connect

    McAtee, R.E.

    1991-09-01

    The objective of the laboratory-pyrolysis studies is to obtain information on the high temperature (< 1200{degree}C) degradation and alteration of organic chemicals and materials similar to those found in the Radioactive Waste Management Complex, Pit 9. This test plan describes experimental procedures, sampling and analysis strategy, sampling procedures, sample control, and document management. It addresses safety issues in the experimental apparatus and procedures, personal training, and hazardous waste disposal. Finally, it describes the data quality objectives using the EPA tiered approach to treatability studies to define where research/scoping tests fit into these studies and the EPA analytical levels required for the tests.

  19. High acceptance of an early dyslexia screening test involving genetic analyses in Germany.

    PubMed

    Wilcke, Arndt; Müller, Bent; Schaadt, Gesa; Kirsten, Holger; Boltze, Johannes

    2016-02-01

    Dyslexia is a developmental disorder characterized by severe problems in the acquisition of reading and writing skills. It has a strong neurobiological basis. Genetic influence is estimated at 50-70%. One of the central problems with dyslexia is its late diagnosis, normally not before the end of the 2nd grade, resulting in the loss of several years for early therapy. Currently, research is focusing on the development of early tests for dyslexia, which may be based on EEG and genetics. Our aim was to determine the acceptance of such a future test among parents. We conducted a representative survey in Germany with 1000 parents of children aged 3-7 years, with and without experience of dyslexia. 88.7% of the parents supported the introduction of an early test for dyslexia based on EEG and genetics; 82.8% would have their own children tested, and 57.9% were willing to pay for the test if health insurance did not cover the costs. Test acceptance was significantly higher if parents had prior experience with dyslexia. The perceived benefits of such a test were early recognition and remediation and, preventing deficits. Concerns regarded the precision of the test, its potentially stigmatizing effect and its costs. The high overall support for the test leads to the conclusion that parents would accept a test for dyslexia based on EEG and genetics.

  20. TESTING AND ACCEPTANCE OF FUEL PLATES FOR RERTR FUEL DEVELOPMENT EXPERIMENTS

    SciTech Connect

    J.M. Wight; G.A. Moore; S.C. Taylor

    2008-10-01

    This paper discusses how candidate fuel plates for RERTR Fuel Development experiments are examined and tested for acceptance prior to reactor insertion. These tests include destructive and nondestructive examinations (DE and NDE). The DE includes blister annealing for dispersion fuel plates, bend testing of adjacent cladding, and microscopic examination of archive fuel plates. The NDE includes Ultrasonic (UT) scanning and radiography. UT tests include an ultrasonic scan for areas of “debonds” and a high frequency ultrasonic scan to determine the "minimum cladding" over the fuel. Radiography inspections include identifying fuel outside of the maximum fuel zone and measurements and calculations for fuel density. Details of each test are provided and acceptance criteria are defined. These tests help to provide a high level of confidence the fuel plate will perform in the reactor without a breach in the cladding.

  1. Nevada Test Site Waste Acceptance Criteria (NTSWAC), Rev. 7-01

    SciTech Connect

    NSTec Environmental Management

    2009-05-01

    This document establishes the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, Nevada Test Site Waste Acceptance Criteria (NTSWAC). The NTSWAC provides the requirements, terms, and conditions under which the Nevada Test Site (NTS) will accept low-level radioactive waste and mixed low-level waste for disposal. The NTSWAC includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the NTS Area 3 and Area 5 Radioactive Waste Management Complex for disposal.

  2. Local tolerance testing under REACH: Accepted non-animal methods are not on equal footing with animal tests.

    PubMed

    Sauer, Ursula G; Hill, Erin H; Curren, Rodger D; Raabe, Hans A; Kolle, Susanne N; Teubner, Wera; Mehling, Annette; Landsiedel, Robert

    2016-07-01

    In general, no single non-animal method can cover the complexity of any given animal test. Therefore, fixed sets of in vitro (and in chemico) methods have been combined into testing strategies for skin and eye irritation and skin sensitisation testing, with pre-defined prediction models for substance classification. Many of these methods have been adopted as OECD test guidelines. Various testing strategies have been successfully validated in extensive in-house and inter-laboratory studies, but they have not yet received formal acceptance for substance classification. Therefore, under the European REACH Regulation, data from testing strategies can, in general, only be used in so-called weight-of-evidence approaches. While animal testing data generated under the specific REACH information requirements are per se sufficient, the sufficiency of weight-of-evidence approaches can be questioned under the REACH system, and further animal testing can be required. This constitutes an imbalance between the regulatory acceptance of data from approved non-animal methods and animal tests that is not justified on scientific grounds. To ensure that testing strategies for local tolerance testing truly serve to replace animal testing for the REACH registration 2018 deadline (when the majority of existing chemicals have to be registered), clarity on their regulatory acceptance as complete replacements is urgently required.

  3. 105 K east ion exchange and cartridge filter restart instrumentation acceptance test report

    SciTech Connect

    Whitehurst, R.

    1996-01-08

    Acceptance Test Report following the completion of ATP-012 for the 105KE CP-A and CP-A Computer and PLC Panels. The test was conducted from 11/13/95 to 12/11/95. Three test discrepancies were generated during the ATP and all were dispositioned and closed. All sections were completed except Section 5.9 which was deleted per ECN 190556.

  4. Integrated Test and Evaluation Flight Test 3 Flight Test Plan

    NASA Technical Reports Server (NTRS)

    Marston, Michael Lawrence

    2015-01-01

    The desire and ability to fly Unmanned Aircraft Systems (UAS) in the National Airspace System (NAS) is of increasing urgency. The application of unmanned aircraft to perform national security, defense, scientific, and emergency management are driving the critical need for less restrictive access by UAS to the NAS. UAS represent a new capability that will provide a variety of services in the government (public) and commercial (civil) aviation sectors. The growth of this potential industry has not yet been realized due to the lack of a common understanding of what is required to safely operate UAS in the NAS. NASA's UAS Integration into the NAS Project is conducting research in the areas of Separation Assurance/Sense and Avoid Interoperability, Human Systems Integration (HSI), and Communication to support reducing the barriers of UAS access to the NAS. This research is broken into two research themes namely, UAS Integration and Test Infrastructure. UAS Integration focuses on airspace integration procedures and performance standards to enable UAS integration in the air transportation system, covering Sense and Avoid (SAA) performance standards, command and control performance standards, and human systems integration. The focus of Test Infrastructure is to enable development and validation of airspace integration procedures and performance standards, including the integrated test and evaluation. In support of the integrated test and evaluation efforts, the Project will develop an adaptable, scalable, and schedulable relevant test environment capable of evaluating concepts and technologies for unmanned aircraft systems to safely operate in the NAS. To accomplish this task, the Project will conduct a series of Human-in-the-Loop and Flight Test activities that integrate key concepts, technologies and/or procedures in a relevant air traffic environment. Each of the integrated events will build on the technical achievements, fidelity and complexity of the previous tests and

  5. The Theory of Planned Behavior (TPB) and Pre-Service Teachers' Technology Acceptance: A Validation Study Using Structural Equation Modeling

    ERIC Educational Resources Information Center

    Teo, Timothy; Tan, Lynde

    2012-01-01

    This study applies the theory of planned behavior (TPB), a theory that is commonly used in commercial settings, to the educational context to explain pre-service teachers' technology acceptance. It is also interested in examining its validity when used for this purpose. It has found evidence that the TPB is a valid model to explain pre-service…

  6. Factors of Online Learning Adoption: A Comparative Juxtaposition of the Theory of Planned Behaviour and the Technology Acceptance Model

    ERIC Educational Resources Information Center

    Ndubisi, Nelson

    2006-01-01

    Organisational investments in information technologies have increased significantly in the past few decades. All around the globe and in Malaysia particularly, a number of educational institutions are experimenting with e-learning. Adopting the theory of planned behaviour (TPB) and the technology acceptance model (TAM) this article tries to…

  7. Utility-Scale Power Tower Solar Systems: Performance Acceptance Test Guidelines

    SciTech Connect

    Kearney, D.

    2013-03-01

    The purpose of these Guidelines is to provide direction for conducting performance acceptance testing for large power tower solar systems that can yield results of a high level of accuracy consistent with good engineering knowledge and practice. The recommendations have been developed under a National Renewable Energy Laboratory (NREL) subcontract and reviewed by stakeholders representing concerned organizations and interests throughout the concentrating solar power (CSP) community. An earlier NREL report provided similar guidelines for parabolic trough systems. These Guidelines recommend certain methods, instrumentation, equipment operating requirements, and calculation methods. When tests are run in accordance with these Guidelines, we expect that the test results will yield a valid indication of the actual performance of the tested equipment. But these are only recommendations--to be carefully considered by the contractual parties involved in the Acceptance Tests--and we expect that modifications may be required to fit the particular characteristics of a specific project.

  8. Effectiveness and relevance of MR acceptance testing: results of an 8 year audit.

    PubMed

    McRobbie, D W; Quest, R A

    2002-06-01

    The effectiveness and relevance of independent acceptance testing was assessed by means of an audit of acceptance procedures for 17 MRI systems, with field strengths in the range 0.5-1.5 T, acquired over 8 years. Signal-to-noise ratio and geometric linearity were found to be the image quality parameters most likely to fall below acceptable or expected standards. These received confirmed successful corrective action in 69% of instances. Non-uniformity, ghosting and poor fat suppression were the next most common non-compliant parameters, but yielded less satisfactory outcomes. Spatial resolution was not found to be a sensitive parameter in determining acceptability. 49% of all non-compliant parameters received verifiable corrective attention. A schedule of actual acceptance criteria is presented and shown to be reasonable. Parameter failure rates were shown not to have improved with time. A safety audit of 11 of the installations revealed the most common failings to be inadequate suite layout and poor use of signs. The mean number of safety issues per installation identified as requiring attention was 5, from a questionnaire of 100 points. A number of anecdotal errors and omissions are reported. The data support the importance of an appropriate acceptance procedure for new clinical MRI equipment and for the involvement of a suitably qualified safety adviser on the project team from the outset.

  9. Test Plan: WIPP bin-scale CH TRU waste tests

    SciTech Connect

    Molecke, M.A.

    1990-08-01

    This WIPP Bin-Scale CH TRU Waste Test program described herein will provide relevant composition and kinetic rate data on gas generation and consumption resulting from TRU waste degradation, as impacted by synergistic interactions due to multiple degradation modes, waste form preparation, long-term repository environmental effects, engineered barrier materials, and, possibly, engineered modifications to be developed. Similar data on waste-brine leachate compositions and potentially hazardous volatile organic compounds released by the wastes will also be provided. The quantitative data output from these tests and associated technical expertise are required by the WIPP Performance Assessment (PA) program studies, and for the scientific benefit of the overall WIPP project. This Test Plan describes the necessary scientific and technical aspects, justifications, and rational for successfully initiating and conducting the WIPP Bin-Scale CH TRU Waste Test program. This Test Plan is the controlling scientific design definition and overall requirements document for this WIPP in situ test, as defined by Sandia National Laboratories (SNL), scientific advisor to the US Department of Energy, WIPP Project Office (DOE/WPO). 55 refs., 16 figs., 19 tabs.

  10. Parking and routing information system phase 1 evaluation -- Individual evaluation test plans

    SciTech Connect

    Carter, R.J.

    1997-04-01

    A parking and routing information system (PARIS) is being designed and deployed at a test site on the Mountain Home Veterans Administration campus in Johnson City, Tennessee using three sensor technologies. The purpose of the PARIS project is to demonstrate innovative integration of vehicle sensing technologies with parking management strategies to improve mobility and relieve congestion associated with a growing medical/technology complex. This technical memorandum presents the four individual evaluation test plans, System Performance Individual Evaluation Test Plan, User Acceptance Individual Evaluation Test Plan, Institutional and Business Issues Individual Evaluation Test Plan, and Transportation Systems Individual Evaluation Test Plan, which were developed to support ORNL`s responsibilities and functions during the four studies. The plans define the level of effort required to satisfy the data collection, processing, and analysis requirements for the assessment of the system performance, user acceptance, institutional and business issues, and transportation systems components of the PARIS phase 1 evaluation. Each plan is divided into three subsections: executive summary, detailed study design, and study management.

  11. 118-B-1 excavation treatability test plan

    SciTech Connect

    Not Available

    1994-07-01

    The Hanford 118-B-1 Burial Ground Treatability Study has been required by milestone change request {number_sign}M-15-93-04, dated September 30, 1993. The change request requires that a treatability test be conducted at the 100-B Area to obtain additional engineering information for remedial design of burial grounds receiving waste from 100 Area removal actions. This treatability study has two purposes: (1) to support development of the Proposed Plan (PP) and Record of Decision (ROD), which will identify the approach to be used for burial ground remediation, and (2) to provide specific engineering information for receiving waste generated from the 100 Area removal actions. Data generated from this test also will provide critical performance and cost information necessary for remedy evaluation in the detailed analysis of alternatives during preparation of the focused feasibility study (FFS). This treatability testing supports the following 100 Area alternatives: (1) excavation and disposal, and (2) excavation, sorting, (treatment), and disposal.

  12. Small, high-pressure ratio compressor mechanical acceptance test, volume 2

    NASA Technical Reports Server (NTRS)

    Metty, G. R.; Shoup, W. I.

    1973-01-01

    The fabrication and mechanical testing of the high-pressure-ratio compressor are reported. Mechanical testing was performed to demonstrate overspeed capability, adequate rotor dynamics, electrical isolation of the gas bearing trunnion mounted diffuser and shroud and the effect of operating parameters (speed and pressure ratio) on clearance of the compressor test rig. The speed range covered was 20 to 120 percent of rated speed (80,000 rpm). Following these tests an acceptance test which consisted of a 5 hour run at 80,000 rpm was made with approximately design impeller to shroud clearances. For Vol. 1, see N73-26483.

  13. Physics of Colloids in Space--Plus (PCS+) Experiment Completed Flight Acceptance Testing

    NASA Technical Reports Server (NTRS)

    Doherty, Michael P.

    2004-01-01

    The Physics of Colloids in Space--Plus (PCS+) experiment successfully completed system-level flight acceptance testing in the fall of 2003. This testing included electromagnetic interference (EMI) testing, vibration testing, and thermal testing. PCS+, an Expedite the Process of Experiments to Space Station (EXPRESS) Rack payload will deploy a second set of colloid samples within the PCS flight hardware system that flew on the International Space Station (ISS) from April 2001 to June 2002. PCS+ is slated to return to the ISS in late 2004 or early 2005.

  14. Accelerated test plan for nickel cadmium spacecraft batteries

    NASA Technical Reports Server (NTRS)

    Hennigan, T. J.

    1973-01-01

    An accelerated test matrix is outlined that includes acceptance, baseline and post-cycling tests, chemical and physical analyses, and the data analysis procedures to be used in determining the feasibility of an accelerated test for sealed, nickel cadmium cells.

  15. 46 CFR 162.060-12 - Use and acceptance of existing test data.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ENGINEERING EQUIPMENT Ballast Water Management Systems § 162.060-12 Use and acceptance of existing test data. (a) A manufacturer whose ballast water management... International Maritime Organization's Guidelines for Approval of Ballast Water Management Systems (G8) may...

  16. 46 CFR 162.060-12 - Use and acceptance of existing test data.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ENGINEERING EQUIPMENT Ballast Water Management Systems § 162.060-12 Use and acceptance of existing test data. (a) A manufacturer whose ballast water management... International Maritime Organization's Guidelines for Approval of Ballast Water Management Systems (G8) may...

  17. 46 CFR 162.060-12 - Use and acceptance of existing test data.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ENGINEERING EQUIPMENT Ballast Water Management Systems § 162.060-12 Use and acceptance of existing test data. (a) A manufacturer whose ballast water management... International Maritime Organization's Guidelines for Approval of Ballast Water Management Systems (G8) may...

  18. 40 CFR 600.009 - Hearing on acceptance of test data.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 30 2014-07-01 2014-07-01 false Hearing on acceptance of test data. 600.009 Section 600.009 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) ENERGY POLICY FUEL ECONOMY AND GREENHOUSE GAS EXHAUST EMISSIONS OF MOTOR VEHICLES General Provisions §...

  19. 40 CFR 600.009 - Hearing on acceptance of test data.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 31 2012-07-01 2012-07-01 false Hearing on acceptance of test data. 600.009 Section 600.009 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) ENERGY POLICY FUEL ECONOMY AND GREENHOUSE GAS EXHAUST EMISSIONS OF MOTOR VEHICLES General Provisions §...

  20. Development of Performance Acceptance Test Guidelines for Large Commercial Parabolic Trough Solar Fields: Preprint

    SciTech Connect

    Kearney, D.; Mehos, M.

    2010-12-01

    Prior to commercial operation, large solar systems in utility-size power plants need to pass a performance acceptance test conducted by the EPC contractor or owners. In lieu of the present absence of engineering code developed for this purpose, NREL has undertaken the development of interim guidelines to provide recommendations for test procedures that can yield results of a high level of accuracy consistent with good engineering knowledge and practice. The fundamental differences between acceptance of a solar power plant and a conventional fossil-fired plant are the transient nature of the energy source and the necessity to utilize an analytical performance model in the acceptance process. These factors bring into play the need to establish methods to measure steady state performance, potential impacts of transient processes, comparison to performance model results, and the possible requirement to test, or model, multi-day performance within the scope of the acceptance test procedure. The power block and BOP are not within the boundaries of this guideline. The current guideline is restricted to the solar thermal performance of parabolic trough systems and has been critiqued by a broad range of stakeholders in CSP development and technology.

  1. Integrating Telemedicine for Disaster Response: Testing the Emergency Telemedicine Technology Acceptance Model

    ERIC Educational Resources Information Center

    Davis, Theresa M.

    2013-01-01

    Background: There is little evidence that technology acceptance is well understood in healthcare. The hospital environment is complex and dynamic creating a challenge when new technology is introduced because it impacts current processes and workflows which can significantly affect patient care delivery and outcomes. This study tested the effect…

  2. 49 CFR 180.511 - Acceptable results of inspections and tests.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., a tank car is qualified for use if it successfully passes the inspections and tests set forth below... QUALIFICATION AND MAINTENANCE OF PACKAGINGS Qualification and Maintenance of Tank Cars § 180.511 Acceptable... the tank in accordance with § 180.515. (a) Visual inspection. A tank car successfully passes...

  3. 49 CFR 180.511 - Acceptable results of inspections and tests.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., a tank car is qualified for use if it successfully passes the inspections and tests set forth below... QUALIFICATION AND MAINTENANCE OF PACKAGINGS Qualification and Maintenance of Tank Cars § 180.511 Acceptable... the tank in accordance with § 180.515. (a) Visual inspection. A tank car successfully passes...

  4. Single Event Effects (SEE) Testing: Practical Approach to Test Plans

    NASA Technical Reports Server (NTRS)

    LaBel, Kenneth A.; Pellish, Jonathan Allen; Berg, Melanie D.

    2014-01-01

    While standards and guidelines for performing SEE testing have existed for several decades, guidance for developing SEE test plans has not been as easy to find. In this presentation, the variety of areas that need to be considered ranging from resource issues (funds, personnel, schedule) to extremely technical challenges (particle interaction and circuit application), shall be discussed. Note: we consider the approach outlined here as a "living" document: Mission-specific constraints and new technology related issues always need to be taken into account.

  5. Nevada Test Site Groundwater Well Rehabilitation Plan

    SciTech Connect

    David B. Hudson

    2006-12-01

    This plan describes actions to improve the utility and credibility of the Nevada Test Site (NTS) interim groundwater monitoring program. The two principal actions are: (1) well maintenance/rehabilitation activities and (2) the deployment of dedicated low-cost and reliable jack-pumps for groundwater sampling from deep monitoring wells. The scope of this proposal is to perform these actions on some number of nine selected wells (Figure 1) to evaluate whether these actions are achievable, practical, cost effective, and result in improved groundwater data quality.

  6. 100 area excavation treatability test plan

    SciTech Connect

    Not Available

    1993-05-01

    This test plan documents the requirements for a treatability study on field radionuclide analysis and dust control techniques. These systems will be used during remedial actions involving excavation. The data from this treatability study will be used to support the feasibility study (FS) process. Development and screening of remedial alternatives for the 100 Area, using existing data, have been completed and are documented in the 100 Area Feasibility Study, Phases 1 and 2 (DOE-RL 1992a). Based on the results of the FS, the Treatability Study Program Plan (DOE-RL 1992b) identifies and prioritizes treatability studies for the 100 Area. The data from the treatability study program support future focused FS, interim remedial measures (IRM) selection, operable unit final remedy selection, remedial design, and remedial actions. Excavation is one of the high-priority, near-term, treatability study needs identified in the program plan (DOE-RL 1992b). Excavation of contaminated soils and buried solid wastes is included in several of the alternatives identified in the 100 Area FS. Although a common activity, excavation has only been used occasionally at the Hanford Site for waste removal applications.

  7. Characterization and acceptance testing of fully depleted thick CCDs for the large synoptic survey telescope

    NASA Astrophysics Data System (ADS)

    Kotov, Ivan V.; Haupt, Justine; O'Connor, Paul; Smith, Thomas; Takacs, Peter; Neal, Homer; Chiang, Jim

    2016-07-01

    The Large Synoptic Survey Telescope (LSST) camera will be made as a mosaic assembled of 189 large format Charge Coupled Devices (CCD). They are n-channel, 100 micron thick devices operated in the over depleted regime. There are 16 segments, 1 million pixels each, that are read out through separate amplifiers. The image quality and readout speed expected from LSST camera translates into strict acceptance requirements for individual sensors. Prototype sensors and preproduction CCDs were delivered by vendors and they have been used for developing test procedures and protocols. Building upon this experience, two test stands were designed and commissioned at Brookhaven National Laboratory for production electro-optical testing. In this article, the sensor acceptance criteria are outlined and discussed, the test stand design and used equipment are presented and the results from commissioning sensor runs are shown.

  8. Formulation of consumables management models: Test plan for the mission planning processor working model

    NASA Technical Reports Server (NTRS)

    Connelly, L. C.

    1977-01-01

    The test plan and test procedures to be used in the verification and validation of the software being implemented in the mission planning processor working model program are documented. The mission planning processor is a user oriented tool for consumables management and is part of the total consumables subsystem management concept. An overview of the working model is presented. Execution of the test plan will comprehensively exercise the working model software. An overview of the test plan, including a testing schedule, is presented along with the test plan for the unit, module, and system levels. The criteria used to validate the working model results for each consumables subsystem is discussed.

  9. Aerosol can puncture device operational test plan

    SciTech Connect

    Leist, K.J.

    1994-05-03

    Puncturing of aerosol cans is performed in the Waste Receiving and Processing Facility Module 1 (WRAP 1) process as a requirement of the waste disposal acceptance criteria for both transuranic (TRU) waste and low-level waste (LLW). These cans have contained such things as paints, lubricating oils, paint removers, insecticides, and cleaning supplies which were used in radioactive facilities. Due to Westinghouse Hanford Company (WHC) Fire Protection concerns of the baseline system`s fire/explosion proof characteristics, a study was undertaken to compare the baseline system`s design to commercially available puncturing devices. While the study found no areas which might indicate a risk of fire or explosion, WHC Fire Protection determined that the puncturing system must have a demonstrated record of safe operation. This could be obtained either by testing the baseline design by an independent laboratory, or by substituting a commercially available device. As a result of these efforts, the commercially available Aerosolv can puncturing device was chosen to replace the baseline design. Two concerns were raised with the system. Premature blinding of the coalescing/carbon filter, due to its proximity to the puncture and draining operation; and overpressurization of the collection bottle due to its small volume and by blinding of the filter assembly. As a result of these concerns, testing was deemed necessary. The objective of this report is to outline test procedures for the Aerosolv.

  10. Power, sex, and rape myth acceptance: testing two models of rape proclivity.

    PubMed

    Chapleau, Kristine M; Oswald, Debra L

    2010-01-01

    Power and sex are thought to be important factors associated with sexual aggression. The goal of this study was to offer a dual-process model to determine how both an implicit power-sex association and explicit power-sex beliefs contribute to rape myth acceptance and rape proclivity. In Study 1, an explicit measure of power-sex beliefs was developed using a participant sample of 131 college students (54% female; age: M = 20.2 years, SD = 3.5 years). In Study 2, 108 male college students (age: M = 19.1 years, SD = 1.3 years) completed a power-sex implicit association test and three explicit measures assessing power-sex beliefs, rape myth acceptance, and rape proclivity. Two models of rape proclivity were compared. The best-fitting model showed that rape myth acceptance mediated the relationships between rape proclivity and an implicit power-sex association, as well as explicit power-sex beliefs.

  11. Test of the technology acceptance model for the internet in pediatrics.

    PubMed Central

    Chismar, William G.; Wiley-Patton, Sonja

    2002-01-01

    There is growing recognition of the importance of the Internet and, more generally, information technology to pediatric care. However, acceptance of these technologies has been low. Attitudes of physicians can play a pivotal role in the adoption session. This study tests the extension to a widely used model in the information systems literature: the Technology Acceptance Model (TAM). Data were collected in a survey of pediatricians to see how well the extended model, TAM2, fits in the medical arena. Our results partially confirm the model; significant parts of the model were not confirmed. The primary factors in pediatricians' acceptance of technology applications relate to their usefulness and job relevance. Little weight is given to ease of use and social factors. We discuss possible explanations for the discrepancies and suggest future research. PMID:12463806

  12. Test of the technology acceptance model for the internet in pediatrics.

    PubMed

    Chismar, William G; Wiley-Patton, Sonja

    2002-01-01

    There is growing recognition of the importance of the Internet and, more generally, information technology to pediatric care. However, acceptance of these technologies has been low. Attitudes of physicians can play a pivotal role in the adoption session. This study tests the extension to a widely used model in the information systems literature: the Technology Acceptance Model (TAM). Data were collected in a survey of pediatricians to see how well the extended model, TAM2, fits in the medical arena. Our results partially confirm the model; significant parts of the model were not confirmed. The primary factors in pediatricians' acceptance of technology applications relate to their usefulness and job relevance. Little weight is given to ease of use and social factors. We discuss possible explanations for the discrepancies and suggest future research.

  13. Search Hanford Accessible Reports Electronically system test plan and documentation: Revision 1

    SciTech Connect

    White, E.L.

    1994-12-07

    The purpose of this document is to describe the following items: the approach, resources, and sequence of the testing activities; identifies the components and features to be tested; the personnel responsible for testing; the risks associated with this plan; and test cases and procedures. This document contains all test documentation for the SHARE system. The Search Hanford Accessible Reports Electronically (SHARE) testing process is based upon WHC-CM-3-10, Software Practices, Section SP-3.3 REV 0, and Appendix J REV 0. These procedures and guidelines are based on IEEE Standard 829-1983. The planning in this document was further influenced through guidance in IEEE Standard 1012-1986. This document contains the System, Acceptance, Integration and Component Test Plans, Designs, Procedures, and Cases for SHARE. The Test Cases and procedures have been attached to the document.

  14. 49 CFR 238.107 - Inspection, testing, and maintenance plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Inspection, testing, and maintenance plan. 238.107... Requirements § 238.107 Inspection, testing, and maintenance plan. (a) General. Beginning on January 1, 2002... develop, and provide to FRA upon request, a detailed inspection, testing, and maintenance plan...

  15. Limited Production (LP) Precision Runway Monitor (PRM) Operational Test and Evaluation integration and OT and E Operational Test Plan

    NASA Astrophysics Data System (ADS)

    Livings, Jeffrey

    1995-05-01

    This document defines the Test Plan and corresponding Test Verification Requirements Traceability Matrix (TVRTM) that will be used to conduct the Limited Production (LP) Precision Runway Monitor (PRM) Operational Test and Evaluation (OT and E) Integration and OT and E Operational tests. These tests will be conducted at the Minneapolis-St. Paul International Airport following the Contractor Site Acceptance Test. The LP PRM OT and E test effort will concentrate on Operational Effectiveness and Suitability. The Operational Effectiveness Test consists of a review of the contractor performed Development Test and Evaluation (DT and E) and Site Acceptance Tests. This review will evaluate whether each of the Measures of Effectiveness had been satisfactorily tested and whether the results meet the Minimum Acceptable Operational REquirements MAORs). This review will be conducted solely by test engineers and does not require the PRM system. The Operational Suitability Tests will expose the test participants (Air Traffic (AT) Controllers and Airway Facilities (AF) Technicians) to the PRM system in an operational environment while they perform specified operational procedures. These tests will be conducted in two separate phases: AT Suitability and AF Suitability. Each of these phases is focused on the specific test participants.

  16. Toward optimizing patient-specific IMRT QA techniques in the accurate detection of dosimetrically acceptable and unacceptable patient plans

    SciTech Connect

    McKenzie, Elizabeth M.; Balter, Peter A.; Stingo, Francesco C.; Jones, Jimmy; Followill, David S.; Kry, Stephen F.

    2014-12-15

    Purpose: The authors investigated the performance of several patient-specific intensity-modulated radiation therapy (IMRT) quality assurance (QA) dosimeters in terms of their ability to correctly identify dosimetrically acceptable and unacceptable IMRT patient plans, as determined by an in-house-designed multiple ion chamber phantom used as the gold standard. A further goal was to examine optimal threshold criteria that were consistent and based on the same criteria among the various dosimeters. Methods: The authors used receiver operating characteristic (ROC) curves to determine the sensitivity and specificity of (1) a 2D diode array undergoing anterior irradiation with field-by-field evaluation, (2) a 2D diode array undergoing anterior irradiation with composite evaluation, (3) a 2D diode array using planned irradiation angles with composite evaluation, (4) a helical diode array, (5) radiographic film, and (6) an ion chamber. This was done with a variety of evaluation criteria for a set of 15 dosimetrically unacceptable and 9 acceptable clinical IMRT patient plans, where acceptability was defined on the basis of multiple ion chamber measurements using independent ion chambers and a phantom. The area under the curve (AUC) on the ROC curves was used to compare dosimeter performance across all thresholds. Optimal threshold values were obtained from the ROC curves while incorporating considerations for cost and prevalence of unacceptable plans. Results: Using common clinical acceptance thresholds, most devices performed very poorly in terms of identifying unacceptable plans. Grouping the detector performance based on AUC showed two significantly different groups. The ion chamber, radiographic film, helical diode array, and anterior-delivered composite 2D diode array were in the better-performing group, whereas the anterior-delivered field-by-field and planned gantry angle delivery using the 2D diode array performed less well. Additionally, based on the AUCs, there

  17. Acceptance test procedure, 241-SY-101/241-C-106 shot loading system

    SciTech Connect

    Ostrom, M.J.

    1994-11-01

    This Acceptance Test Procedure is for the 241-SY-101/241-C-106 Shot Loading System. The procedure will test the components of the Shot Loading System and its capability of adequately loading shot into the annular space of the Container. The loaded shot will provide shielding as required for transporting and storage of a contaminated pump after removal from the tank. This test serves as verification that the SLS is acceptable for use in the pump removal operations for Tanks 241-SY-101, 241-C-106 and 241-AY-102. The pump removal operation for these three tanks will be performed by two different organizations with different equipment, but the Shot Loading System will be compatible between the two operations.

  18. Long-Term Materials Test Program: materials exposure test plan

    SciTech Connect

    1981-12-01

    The Long Term Materials Test Program is designed to identify promising corrosion resistant materials for coal-fired gas turbine applications. Resistance of materials to long term accelerated corrosion will be determined through realistic PFB environmental exposure of candidate turbine materials for up to 14,000 hours. Selected materials also will be evaluated for their ability to withstand the combined erosive and corrosive aspects of the PFB effluent. A pressurized fluidized bed combustor facility has been constructed at the General Electric Coal Utilization Research Laboratory at Malta, New York. The 12-inch diameter combustor will burn high sulfur coal with moderate-to-high chlorine and alkali levels and utilize dolomite as the sulfur sorbent. Hot gas cleanup is achieved using three stages of cyclone separators. Downstream of the cylone separators, a low velocity test section (approx. 30 ft/s) capable of housing 180 pin specimens 1/4'' diameter has been installed to assess the corrosion resistance of the various materials at three different temperatures ranging from 1300 to 1600/sup 0/F. Following the low velocity test section is a high velocity test section consisting of four cascades of airfoil shaped specimens, six specimens per cascade. This high velocity test section is being used to evaluate the combined effects of erosion and corrosion on the degradation of gas turbine materials at gas velocities of 800 to 1400 ft/s. This report summarizes the materials selection and materials exposure test plan for the Long Term Materials Test.

  19. Modeling of a Parabolic Trough Solar Field for Acceptance Testing: A Case Study

    SciTech Connect

    Wagner, M. J.; Mehos, M. S.; Kearney, D. W.; McMahan, A. C.

    2011-01-01

    As deployment of parabolic trough concentrating solar power (CSP) systems ramps up, the need for reliable and robust performance acceptance test guidelines for the solar field is also amplified. Project owners and/or EPC contractors often require extensive solar field performance testing as part of the plant commissioning process in order to ensure that actual solar field performance satisfies both technical specifications and performance guaranties between the involved parties. Performance test code work is currently underway at the National Renewable Energy Laboratory (NREL) in collaboration with the SolarPACES Task-I activity, and within the ASME PTC-52 committee. One important aspect of acceptance testing is the selection of a robust technology performance model. NREL1 has developed a detailed parabolic trough performance model within the SAM software tool. This model is capable of predicting solar field, sub-system, and component performance. It has further been modified for this work to support calculation at subhourly time steps. This paper presents the methodology and results of a case study comparing actual performance data for a parabolic trough solar field to the predicted results using the modified SAM trough model. Due to data limitations, the methodology is applied to a single collector loop, though it applies to larger subfields and entire solar fields. Special consideration is provided for the model formulation, improvements to the model formulation based on comparison with the collected data, and uncertainty associated with the measured data. Additionally, this paper identifies modeling considerations that are of particular importance in the solar field acceptance testing process and uses the model to provide preliminary recommendations regarding acceptable steady-state testing conditions at the single-loop level.

  20. Acceptability of Testing Children for Tobacco-Smoke Exposure: A National Parent Survey

    PubMed Central

    Tanski, Susanne E.; McMillen, Robert C.; Ross, Kaile M.; Lipstein, Ellen A.; Hipple, Bethany J.; Friebely, Joan; Klein, Jonathan D.

    2011-01-01

    BACKGROUND: Tests are available to measure children's exposure to tobacco smoke. One potential barrier to testing children for tobacco-smoke exposure is the belief that parents who smoke would not want their child tested. No previous surveys have assessed whether testing children for exposure to tobacco smoke in the context of their child's primary care visit is acceptable to parents. OBJECTIVE: To assess whether testing children for tobacco-smoke exposure is acceptable to parents. DESIGN AND METHODS: We conducted a national random-digit-dial telephone survey of households from September to November 2006. The sample was weighted by race and gender, based on the 2005 US Census, to be representative of the US population. RESULTS: Of 2070 eligible respondents contacted, 1803 (87.1%) completed the surveys. Among 477 parents in the sample, 60.1% thought that children should be tested for tobacco-smoke exposure at their child's doctor visit. Among the parental smokers sampled, 62.0% thought that children should be tested for tobacco-smoke exposure at the child's doctor visit. In bivariate analysis, lower parental education level, allowing smoking in the home, nonwhite race, and female gender were each associated (P < .05) with wanting the child tested for tobacco-smoke exposure. CONCLUSIONS: The majority of nonsmoking and smoking parents want their children tested for tobacco-smoke exposure during the child's health care visit. PMID:21422089

  1. Project W-314 specific test and evaluation plan for AZ tank farm upgrades

    SciTech Connect

    Hays, W.H.

    1998-08-12

    The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made by the addition of the SN-631 transfer line from the AZ-O1A pit to the AZ-02A pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation P1 an (TEP). Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities, etc), Factory Tests and Inspections (FTIs), installation tests and inspections, Construction Tests and Inspections (CTIs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). The STEP will be utilized in conjunction with the TEP for verification and validation.

  2. Preference for physician vs. nurse-initiated opt-out screening on HIV test acceptance.

    PubMed

    Kinsler, Janni J; Sayles, Jennifer N; Cunningham, William E; Mahajan, Anish

    2013-01-01

    Provider-initiated opt-out HIV screening suggests that providers should routinely order HIV tests unless a patient declines. However, data on how providers will respond to this new screening model are scarce. Documented concerns from the providers' perspectives have included time constraints of a typical patient encounter, and discomfort with discussing sexual history and risk behavior with patients. To address these potential barriers, nurse-initiated screening has been proposed as an approach to increasing screening rates in general medical and urgent care settings. This study compares patient acceptability of provider-initiated opt-out HIV screening with nurse-initiated opt-out HIV screening among 220 patients between the ages of 18-64 from two publically funded "safety-net" outpatient clinics in Los Angeles County. Our study found that 77% of patients agreed to HIV testing using opt-out screening, and that HIV test acceptance was higher with the physician-initiated opt-out model compared with the nurse-initiated opt-out model (adjusted odds ratios = 2.92; 95% CI = 1.37-6.22). These findings indicate that adding opt-out screening to primary care providers responsibilities may be an acceptable and effective strategy for addressing the perennially low HIV testing rates, particularly among low income, traditionally underserved patient populations among whom the epidemic is expanding most rapidly.

  3. HotSpot Software Test Plan

    SciTech Connect

    Walker, H; Homann, S G

    2009-03-12

    This Software Test Plan (STP) describes the procedures used to verify and validate that the HotSpot Health Physics Codes meet the requirements of its user base, which includes: (1) Users of the PC version of HotSpot conducting consequence assessment, hazard assessment and safety analysis calculations; and (2) Users of the NARAC Web and iClient software tools, which allow users to run HotSpot for consequence assessment modeling. This plan is intended to meet Critical Recommendation 2 from the Software Evaluation of HotSpot and DOE Safety Software Toolbox Recommendation for inclusion of HotSpot in the Department of Energy (DOE) Safety Software Toolbox. These users and sponsors of the HotSpot software and the organizations they represent constitute the intended audience for this document. HotSpot software is maintained for the Department of Energy Office of Emergency Operations by the National Atmospheric Release Advisory Center (NARAC) at Lawrence Livermore National Laboratory (LLNL). An overview of HotSpot and NARAC are provided.

  4. Photographic copy of site plan for proposed Test Stand "D" ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of site plan for proposed Test Stand "D" in 1958. The contemporary site plans of test stands "A," "B," and "C" are also visible, along with the interconnecting tunnel system. California Institute of Technology, Jet Propulsion Laboratory, Plant Engineering "Site Plan for Proposed Test Stand "D" - Edwards Test Station," drawing no. ESP/22-0, 14 November 1958 - Jet Propulsion Laboratory Edwards Facility, Test Stand D, Edwards Air Force Base, Boron, Kern County, CA

  5. Nevada Test Site Resource Management Plan

    SciTech Connect

    1998-12-01

    The Nevada Test Site (NTS) Resource Management Plan (RMP) describes the NTS Stewardship Mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. The NTS Stewardship Mission is to manage the land and facilities at the NTS as a unique and valuable national resource. The RMP has defined goals for twelve resource areas based on the principles of ecosystem management. These goals were established using an interdisciplinary team of DOE/NV resource specialists with input from surrounding land managers, private parties, and representatives of Native American governments. The overall goal of the RMP is to facilitate improved NTS land use management decisions within the Great Basin and Mojave Desert ecoregions.

  6. Influence of label and location of testing on acceptability of cream cheese varying in fat content.

    PubMed

    Daillant-Spinnler, B; Issanchou, S

    1995-04-01

    The acceptability of low-, medium- and high-fat versions of a cream cheese to consumers was measured in different conditions by rating overall distance from ideal. The influence of label (unlabelled vs. commercial package) differed according to the cream cheese fat-level habits of the assessors and to the fat level of the product. In labelled testing, high-fat cream cheese was more highly accepted by high- and medium-fat users and low-fat cream cheese seemed to be further from ideal for high-fat users. The location of testing (home vs. laboratory) affected the rating of only the high-fat product: consumers are more severe on it at home than in the laboratory.

  7. In search of acceptable alternatives to the murine histamine sensitisation test (HIST): what is possible and practical?

    PubMed

    Wagner, L; Isbrucker, R; Locht, C; Arciniega, J; Costanzo, A; McFarland, R; Oh, H; Hoonakker, M; Descamps, J; Andersen, S R; Gupta, R K; Markey, K; Chapsal, J M; Lidster, K; Casey, W; Allen, D

    2016-01-01

    The 'International Workshop on Alternatives to the Murine Histamine Sensitization Test for Acellular Pertussis Vaccines: In Search of Acceptable Alternatives to the Murine Histamine Sensitization Test (HIST): What is Possible and Practical?' was held on 4 and 5 March 2015 in London, United Kingdom. Participants discussed the results of the data generated from an international collaborative study (BSP114 Phase 2) sponsored by the European Directorate for the Quality of Medicines & Health Care (EDQM) to determine if a modified Chinese hamster ovary (CHO) cell-based clustering assay is a suitable alternative to replace HIST. Workshop participants agreed that protocol transferability demonstrated in the collaborative study indicates that a standardised CHO cell assay is adequate for measuring pure PTx in reference preparations. However, vaccine manufacturers would still need to demonstrate that the method is valid to detect or measure residual PTx in their specific adjuvanted products. The 2 modified CHO cell protocols included in the study (the Direct and the Indirect Methods) deserve further consideration as alternatives to HIST. Using the CHO cell assay, an in vitro alternative, for acellular pertussis (aP) vaccine batch release testing would reduce the number of animals used for aP vaccine safety testing. A strategic, stepwise adoption plan was proposed, in which the alternative test would be used for release purposes first, and then, once sufficient confidence in its suitable performance has been gained, its use would be extended to stability testing.

  8. Space shuttle orbiter vehicle star tracker test program plan

    NASA Technical Reports Server (NTRS)

    Smith, R. A.

    1974-01-01

    The development model test program was written to provide guidance for essential star tracker test support to the Space Shuttle Orbiter Program. The program organization included test equipment preparation, prototype baseline/acceptance tests, prototype total performance tests, and prototype special tests. Test configurations, preparation phase, documentation, scheduling, and manpower requirements are discussed. The test program permits an early evaluation of the tracker's performance prior to completion and testing of the final flight models.

  9. Social trust, risk perceptions and public acceptance of recycled water: testing a social-psychological model.

    PubMed

    Ross, Victoria L; Fielding, Kelly S; Louis, Winnifred R

    2014-05-01

    Faced with a severe drought, the residents of the regional city of Toowoomba, in South East Queensland, Australia were asked to consider a potable wastewater reuse scheme to supplement drinking water supplies. As public risk perceptions and trust have been shown to be key factors in acceptance of potable reuse projects, this research developed and tested a social-psychological model of trust, risk perceptions and acceptance. Participants (N = 380) were surveyed a few weeks before a referendum was held in which residents voted against the controversial scheme. Analysis using structural equation modelling showed that the more community members perceived that the water authority used fair procedures (e.g., consulting with the community and providing accurate information), the greater their sense of shared identity with the water authority. Shared social identity in turn influenced trust via increased source credibility, that is, perceptions that the water authority is competent and has the community's interest at heart. The findings also support past research showing that higher levels of trust in the water authority were associated with lower perceptions of risk, which in turn were associated with higher levels of acceptance, and vice versa. The findings have a practical application for improving public acceptance of potable recycled water schemes.

  10. Test report for run-in acceptance testing of Project W-151 300 HP mixing pumps

    SciTech Connect

    Berglin, B.G.

    1998-01-29

    This report documents the results of a performance demonstration and operational checkout of three 300 HP mixer pumps in accordance with WHC-SD-WI51-TS-001 ``Mixer Pump Test Specification for Project W-151`` and Statement of Work 8K520-EMN-95-004 ``Mixer Pump Performance Demonstration at MASF`` in the 400 Area Maintenance and Storage Facility (MASF) building. Testing of the pumps was performed by Fast Flux Test Facility (FFTF) Engineering and funded by the Tank Waste Remediation System (TWRS) Project W-151. Testing began with the first pump on 04-01-95 and ended with the third pump on 11-01-96. Prior to testing, the MASF was modified and prepared to meet the pump testing requirements set forth by the Test Specification and the Statement of Work.

  11. W-026 acceptance test report system integration equipment (SIE)(submittal {number_sign} 018.6.A)

    SciTech Connect

    Watson, T.L.

    1997-01-27

    Acceptance testing of the System Integration Equipment (SIE) at Hanford was performed in two stages. The first was inconclusive, and resulted in a number of findings. These finding. are summarized as part of this report. The second stage of testing addressed these findings, and performed full system testing per the approved test procedure. This report includes summaries of all testing, results and finding.. Although the SIE did not in some cases perform as required for plant operations, it did perform per the system specification. (These discrepancies were noted and are addressed elsewhere.) Following testing, the system was formaLLy accepted. Documentation of this acceptance is incLuded in this report.

  12. Test Plan for the overburden removal demonstration

    SciTech Connect

    Rice, P.; Thompson, D.; Winberg, M.; Skaggs, J.

    1993-06-01

    The removal of soil overburdens from contaminated pits and trenches involves using equipment that will remove a small layer of soil from 3 to 6 in. at any time. As a layer of soil is removed, overburden characterization techniques perform surveys to a depth that exceeds each overburden removal layer to ensure that the removed soil will be free of contamination. It is generally expected that no contamination will be found in the soil overburden, which was brought in after the waste was put in place. It is anticipated that some containers in the waste zone have lost their integrity, and the waste leakage from those containers has migrated by gravity downward into the waste zone. To maintain a safe work environment, this method of overburden removal should allow safe preparation of a pit or trench for final remediation. To demonstrate the soil overburden techniques, the Buried Waste Integrated Demonstration Program has contracted vendor services to provide equipment and techniques demonstrating soil overburden removal technology. The demonstration will include tests that will evaluate equipment performance and techniques for removal of overburden soil, control of contamination spread, and dust control. To evaluate the performance of these techniques, air particulate samples, physical measurements of the excavation soil cuts, maneuverability measurements, and time versus volume (rate) of soil removal data will be collected during removal operations. To provide a medium for sample evaluation, the overburden will be spiked at specific locations and depths with rare earth tracers. This test plan will be describe the objectives of the demonstration, data quality objectives, methods to be used to operate the equipment and use the techniques in the test area, and methods to be used in collecting data during the demonstration.

  13. FINAL DISPOSAL OF RADIOACTIVE WASTE IN GERMANY: PLAN APPROVAL PROCESS OF KONRAD MINE AND ACCEPTANCE REQUIREMENTS

    SciTech Connect

    Bandt, Gabriele; Posnatzki, Britta; Beckers, Klaus-Arno

    2003-02-27

    Currently no final repository for any type of radioactive waste is operated in Germany. Preliminary Final Storage Acceptance Requirements for radioactive waste packages were published in 1995. Up to now these are the basis for treatment of radioactive waste in Germany. After licensing of the final repository these preliminary waste acceptance requirements are completed with licensing conditions. Some of these conditions affect the preliminary waste acceptance requirements, e. g. behavior of chemo-toxic substances in case of accidents in the final repository or the allowed maximum concentration of fissile material. The presented examples of radioactive waste conditioning campaigns demonstrate that no difficulties are expected in management, characterization and quality assurance of radioactive wastes due to the licensing conditions.

  14. Home-based voluntary HIV counselling and testing found highly acceptable and to reduce inequalities

    PubMed Central

    2010-01-01

    Background Low uptake of voluntary HIV counselling and testing (VCT) in sub-Saharan Africa is raising acceptability concerns which might be associated with ways by which it is offered. We investigated the acceptability of home-based delivery of counselling and HIV testing in urban and rural populations in Zambia where VCT has been offered mostly from local clinics. Methods A population-based HIV survey was conducted in selected communities in 2003 (n = 5035). All participants stating willingness to be HIV tested were offered VCT at home and all counselling was conducted in the participants' homes. In the urban area post-test counselling and giving of results were done the following day whereas in rural areas this could take 1-3 weeks. Results Of those who indicated willingness to be HIV tested, 76.1% (95%CI 74.9-77.2) were counselled and received the test result. Overall, there was an increase in the proportion ever HIV tested from 18% before provision of home-based VCT to 38% after. The highest increase was in rural areas; among young rural men aged 15-24 years up from 14% to 42% vs. for urban men from 17% to 37%. Test rates by educational attainment changed from being positively associated to be evenly distributed after home-based VCT. Conclusions A high uptake was achieved by delivering HIV counselling and testing at home. The highest uptakes were seen in rural areas, in young people and groups with low educational attainment, resulting in substantial reductions in existing inequalities in accessing VCT services. PMID:20553631

  15. 10 CFR 51.108 - Public hearings on Commission findings that inspections, tests, analyses, and acceptance criteria...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., tests, analyses, and acceptance criteria of combined licenses are met. 51.108 Section 51.108 Energy...) Production and Utilization Facilities § 51.108 Public hearings on Commission findings that inspections, tests, analyses, and acceptance criteria of combined licenses are met. In any public hearing requested under...

  16. 10 CFR 51.108 - Public hearings on Commission findings that inspections, tests, analyses, and acceptance criteria...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., tests, analyses, and acceptance criteria of combined licenses are met. 51.108 Section 51.108 Energy...) Production and Utilization Facilities § 51.108 Public hearings on Commission findings that inspections, tests, analyses, and acceptance criteria of combined licenses are met. In any public hearing requested under...

  17. 10 CFR 26.91 - Acceptable devices for conducting initial and confirmatory tests for alcohol and methods of use.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Acceptable devices for conducting initial and confirmatory tests for alcohol and methods of use. 26.91 Section 26.91 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Collecting Specimens for Testing § 26.91 Acceptable devices for conducting...

  18. 10 CFR 26.91 - Acceptable devices for conducting initial and confirmatory tests for alcohol and methods of use.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Acceptable devices for conducting initial and confirmatory tests for alcohol and methods of use. 26.91 Section 26.91 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Collecting Specimens for Testing § 26.91 Acceptable devices for conducting...

  19. 10 CFR 26.91 - Acceptable devices for conducting initial and confirmatory tests for alcohol and methods of use.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Acceptable devices for conducting initial and confirmatory tests for alcohol and methods of use. 26.91 Section 26.91 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Collecting Specimens for Testing § 26.91 Acceptable devices for conducting...

  20. 10 CFR 26.91 - Acceptable devices for conducting initial and confirmatory tests for alcohol and methods of use.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Acceptable devices for conducting initial and confirmatory tests for alcohol and methods of use. 26.91 Section 26.91 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Collecting Specimens for Testing § 26.91 Acceptable devices for conducting...

  1. 10 CFR 26.91 - Acceptable devices for conducting initial and confirmatory tests for alcohol and methods of use.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Acceptable devices for conducting initial and confirmatory tests for alcohol and methods of use. 26.91 Section 26.91 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Collecting Specimens for Testing § 26.91 Acceptable devices for conducting...

  2. MCC/shuttle test plan. Volume 1: Philosophy and guidelines

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The Mission Control Center/Shuttle Test Plan is defined from development through operations to a level of detail which will support the National Aeronautics and Space Administration and contractor management in the following areas: test management, test tool development, and resource and schedule planning.

  3. Acceptance Performance Test Guideline for Utility Scale Parabolic Trough and Other CSP Solar Thermal Systems: Preprint

    SciTech Connect

    Mehos, M. S.; Wagner, M. J.; Kearney, D. W.

    2011-08-01

    Prior to commercial operation, large solar systems in utility-size power plants need to pass a performance acceptance test conducted by the engineering, procurement, and construction (EPC) contractor or owners. In lieu of the present absence of ASME or other international test codes developed for this purpose, the National Renewable Energy Laboratory has undertaken the development of interim guidelines to provide recommendations for test procedures that can yield results of a high level of accuracy consistent with good engineering knowledge and practice. Progress on interim guidelines was presented at SolarPACES 2010. Significant additions and modifications were made to the guidelines since that time, resulting in a final report published by NREL in April 2011. This paper summarizes those changes, which emphasize criteria for assuring thermal equilibrium and steady state conditions within the solar field.

  4. Utility-Scale Parabolic Trough Solar Systems: Performance Acceptance Test Guidelines, April 2009 - December 2010

    SciTech Connect

    Kearney, D.

    2011-05-01

    Prior to commercial operation, large solar systems in utility-size power plants need to pass a performance acceptance test conducted by the engineering, procurement, and construction (EPC) contractor or owners. In lieu of the present absence of ASME or other international test codes developed for this purpose, the National Renewable Energy Laboratory has undertaken the development of interim guidelines to provide recommendations for test procedures that can yield results of a high level of accuracy consistent with good engineering knowledge and practice. The Guidelines contained here are specifically written for parabolic trough collector systems with a heat-transport system using a high-temperature synthetic oil, but the basic principles are relevant to other CSP systems.

  5. Acceptance Testing of the Vapor Phase Catalytic Ammonia Removal Engineering Development Unit

    NASA Technical Reports Server (NTRS)

    Flynn, Michael; Fisher, John; Kliss, Mark; Tleimat, Maher; Quinn, Gregory; Fort, James; Nalette, Tim; Baker, Gale

    2005-01-01

    This paper describes the results of acceptance testing of the Vapor Phase Catalytic Ammonia Removal (VPCAR) technology. The VPCAR technology is currently being developed by NASA as a Mars transit vehicle water recycling system. NASA has recently completed a grant to develop a next generation VPCAR system. This grant was peer reviewed and funded through the Advanced Life Support (ALS) National Research Announcement (NRA). The grant funded a contract with Water Reuse Technology Inc. to construct an engineering development unit. This contract concluded with the shipment of the final deliverable to NASA on 8/31/03. The objective of the acceptance testing was to characterize the performance of this new system. This paper presents the results of mass power, and volume measurements for the delivered system. In addition, product water purity analysis for a Mars transit mission and a planetary base wastewater ersatz are provided. Acoustic noise levels, interface specifications and system reliability results are also discussed. An assessment of the readiness of the technology for human testing and recommendations for future improvements are provided.

  6. International Space Station Environmental Control and Life Support System Acceptance Testing for the Pressurized Mating Adapters

    NASA Technical Reports Server (NTRS)

    Williams, David E.

    2008-01-01

    The International Space Station (ISS) Pressurized Mating Adapters (PMAs) Environmental Control and Life Support (ECLS) System is comprised of three subsystems: Atmosphere Control and Supply (ACS), Temperature and Humidity Control (THC), and Water Recovery and Management (WRM). PMAs 1 and 2 flew to ISS on Flight 2A and Pressurized Mating Adapter (PMA) 3 flew to ISS on Flight 3A. This paper provides a summary of the PMAs ECLS design and a detailed discussion of the ISS ECLS Acceptance Testing methodologies utilized for the PMAs.

  7. Formulation of a candidate glass for use as an acceptance test standard material

    SciTech Connect

    Ebert, W.L.; Strachan, D.M.; Wolf, S.F.

    1998-04-01

    In this report, the authors discuss the formulation of a glass that will be used in a laboratory testing program designed to measure the precision of test methods identified in the privatization contracts for the immobilization of Hanford low-activity wastes. Tests will be conducted with that glass to measure the reproducibility of tests and analyses that must be performed by glass producers as a part of the product acceptance procedure. Test results will be used to determine if the contractually required tests and analyses are adequate for evaluating the acceptability of likely immobilized low-activity waste (ILAW) products. They will also be used to evaluate if the glass designed for use in these tests can be used as an analytical standard test material for verifying results reported by vendors for tests withg ILAW products. The results of those tests and analyses will be presented in a separate report. The purpose of this report is to document the strategy used to formulate the glass to be used in the testing program. The low-activity waste reference glass LRM that will be used in the testing program was formulated to be compositionally similar to ILAW products to be made with wastes from Hanford. Since the ILAW product compositions have not been disclosed by the vendors participating in the Hanford privatization project, the composition of LRM was formulated based on simulated Hanford waste stream and amounts of added glass forming chemicals typical for vitrified waste forms. The major components are 54 mass % SiO{sub 2}, 20 mass % Na{sub 2}O, 10 mass % Al{sub 2}O{sub 3}, 8 mass % B{sub 2}O{sub 3}, and 1.5 mass % K{sub 2}O. Small amounts of other chemicals not present in Hanford wastes were also included in the glass, since they may be included as chemical additives in ILAW products. This was done so that the use of LRM as a composition standard could be evaluated. Radionuclides were not included in LRM because a nonradioactive material was desired.

  8. 13. Photographic copy of site plan displaying Test Stand 'C' ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. Photographic copy of site plan displaying Test Stand 'C' (4217/E-18), Test Stand 'D' (4223/E-24), and Control and Recording Center (4221/E-22) with ancillary structures, and connecting roads and services. California Institute of Technology, Jet Propulsion Laboratory, Facilities Engineering and Construction Office 'Repairs to Test Stand 'C,' Edwards Test Station, Legend & Site Plan M-1,' drawing no. ESP/115, August 14, 1987. - Jet Propulsion Laboratory Edwards Facility, Test Stand C, Edwards Air Force Base, Boron, Kern County, CA

  9. Energy Systems Test Area (ESTA) Battery Test Operations User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Salinas, Michael

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ESTA Battery Test Operations. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  10. Energy Systems Test Area (ESTA) Electrical Power Systems Test Operations: User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Salinas, Michael J.

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ESTA Electrical Power Systems Test Laboratory. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  11. HARD PAN I Test Series Test and Instrumentation Plans. Volume I. Test Plan

    DTIC Science & Technology

    1975-12-01

    structure in a layered geology due to a simulated neer-surface nuclear detonation. The test geology was clay over interbedded limtstone and shale ...a geology characterized by a layer of clay over a competent rock layer composed of interbedded limestone and shales . Certain portions of the test...and shale has much higher seismic velocities. A downward propagating shock wave is formed in the upper medium due to the interaction of the

  12. Fast flux test facility, transition project plan

    SciTech Connect

    Guttenberg, S.

    1994-11-15

    The FFTF Transition Project Plan, Revision 1, provides changes and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition.

  13. Space station propulsion technology: Space station propulsion system test bed test plan

    NASA Technical Reports Server (NTRS)

    Briley, G. L.

    1986-01-01

    Testing of the hydrogen/oxygen Space Station Propulsion System will demonstrate the technology readiness for the IOC application. To facilitate early demonstration of this technology and to allow demonstration of maturing technology, this testing will be performed with the components installed on a test bed which simulated the Space Station Structure. The test plan contains a description of the test bed, test objective, instrumentation plan, and controls plan. Each of these is discussed in detail.

  14. U.S. EPA proposes Allied Landfill Cleanup Plan, accepting comments

    EPA Pesticide Factsheets

    For Immediate Release No. 14-OPA152 Chicago (Sept. 22) -- The U.S. Environmental Protection Agency is issuing a proposed plan to clean up the Allied Paper Landfill in Kalamazoo, Michigan, a part of the Allied Paper/Portage Creek/Kalamazoo Rive

  15. 40 CFR 60.1075 - When must I accept comments on the materials separation plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... materials separation plan? 60.1075 Section 60.1075 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of Performance for Small Municipal Waste Combustion Units for Which Construction is Commenced After August...

  16. Acceptance criteria for the evaluation of Category 1 fuel cycle facility physical security plans

    SciTech Connect

    Dwyer, P.A.

    1991-10-01

    This NUREG document presents criteria developed from US Nuclear Regulatory Commission regulations for the evaluation of physical security plans submitted by Category 1 fuel facility licensees. Category 1 refers to those licensees who use or possess a formula quantity of strategic special nuclear material.

  17. Validation of the Socially Acceptable Behaviour (SAB) test in a Central‑Italy pet dog population.

    PubMed

    Dalla Villa, Paolo; Barnard, Shanis; Di Nardo, Antonio; Iannetti, Luigi; Podaliri Vulpiani, Michele; Trentini, Roberto; Serpell, James A; Siracusa, Carlo

    2017-03-31

    Aggressiveness is reported to be the most important public health issue related to both owned and free‑roaming dogs. Common approaches to assess canine aggressiveness are temperament tests. The main aim of this study was to evaluate whether one such test, the Socially Acceptable Behaviour (SAB) test, created to evaluate aggressive and fearful behaviour in dogs in the Netherlands, could be used reliably to assess dog aggression and fear in a population of owned dogs in Central Italy. Reactions to the test were recorded and compared to the owners' perception of their dog's aggressiveness using a validated questionnaire (C‑BARQ). Dogs showing aggressive reactions during the test obtained significantly higher (more aggressive) scores on the C‑BARQ subscales 'stranger‑directed aggression' (SDA p<0.001), 'owner‑directed aggression' (ODA p = 0.03), and 'familiar dog aggression' (FDA p = 0.006), than dogs who did not react aggressively. Logistic regression analysis revealed that 7 of the SAB‑subtests were predictive of the SDA score. The findings indicated that aggression directed toward unfamiliar people can be reliably assessed using the SAB test for a population of Italian pet dogs.

  18. The Careful Puppet Master: Reducing risk and fortifying acceptance testing with Jenkins CI

    NASA Astrophysics Data System (ADS)

    Smith, Jason A.; Richman, Gabriel; DeStefano, John; Pryor, James; Rao, Tejas; Strecker-Kellogg, William; Wong, Tony

    2015-12-01

    Centralized configuration management, including the use of automation tools such as Puppet, can greatly increase provisioning speed and efficiency when configuring new systems or making changes to existing systems, reduce duplication of work, and improve automated processes. However, centralized management also brings with it a level of inherent risk: a single change in just one file can quickly be pushed out to thousands of computers and, if that change is not properly and thoroughly tested and contains an error, could result in catastrophic damage to many services, potentially bringing an entire computer facility offline. Change management procedures can—and should—be formalized in order to prevent such accidents. However, like the configuration management process itself, if such procedures are not automated, they can be difficult to enforce strictly. Therefore, to reduce the risk of merging potentially harmful changes into our production Puppet environment, we have created an automated testing system, which includes the Jenkins CI tool, to manage our Puppet testing process. This system includes the proposed changes and runs Puppet on a pool of dozens of RedHat Enterprise Virtualization (RHEV) virtual machines (VMs) that replicate most of our important production services for the purpose of testing. This paper describes our automated test system and how it hooks into our production approval process for automatic acceptance testing. All pending changes that have been pushed to production must pass this validation process before they can be approved and merged into production.

  19. Performance deterioration due to acceptance testing and flight loads; JT90 jet engine diagnostic program

    NASA Technical Reports Server (NTRS)

    Olsson, W. J.

    1982-01-01

    The results of a flight loads test of the JT9D-7 engine are presented. The goals of this test program were to: measure aerodynamic and inertia loads on the engine during flight, explore the effects of airplane gross weight and typical maneuvers on these flight loads, simultaneously measure the changes in engine running clearances and performance resulting from the maneuvers, make refinements of engine performance deterioration prediction models based on analytical results of the tests, and make recommendations to improve propulsion system performance retention. The test program included a typical production airplane acceptance test plus additional flights and maneuvers to encompass the range of flight loads in revenue service. The test results indicated that aerodynamic loads, primarily at take-off, were the major cause of rub-indicated that aerodynamic loads, primarily at take-off, were the major cause of rub-induced deterioration in the cold sectin of the engine. Differential thermal expansion between rotating and static parts plus aerodynamic loads combined to cause blade-to-seal rubs in the turbine.

  20. Pap testing, awareness, and acceptability of a human papillomavirus (HPV) vaccine among Chinese American women.

    PubMed

    Nguyen, Giang T; Chen, Bei; Chan, Melvin

    2012-10-01

    Little is known about the knowledge and opinions of human papillomavirus (HPV) vaccine among Chinese immigrants, nor the impact of framing HPV as a sexually transmitted infection in this population. A cross-sectional survey was conducted focusing on knowledge and experience with HPV, HPV vaccine, cervical cancer and Pap testing, and attitudes toward HPV vaccine in response to different message frames. Chinese American women were recruited in a community setting (n = 162). Only 19 % had heard of HPV and 38 % had had a Pap test in the last 3 years. Multivariate logistic regression showed that English proficiency was associated with vaccination acceptance and insurance status was associated with HPV awareness; there was no observed correlation with message framing. Chinese American women with limited English proficiency have low HPV awareness. Community-based, culturally appropriate education about cervical cancer and HPV vaccine should be directed toward limited-English proficient Chinese American women.

  1. NEMO medium voltage converter factory acceptance, operational and final integration tests

    NASA Astrophysics Data System (ADS)

    Cocimano, Rosanna; NEMO Collaboration

    2011-01-01

    The NEMO Collaboration, as part of the KM3NeT EU-funded consortium, is developing technical solutions for the construction of a cubic-kilometer scale neutrino telescope in the Mediterranean sea several kilometers below the sea level and far from the shore. In this framework, after years of design, development, assembly and testing the Alcatel deep sea medium voltage power converter (MVC) is ready for deployment at 100 km from the Capo Passero shore station. The MVC converts the 10 kV to an instrument-friendly 375 V for a 10 kW power. The MVC will be presented with focus on the factory acceptance, operational and final integration tests that recently have been carried out.

  2. Waste acceptance and the DWPF Startup Test Program: Impacts of process changes

    SciTech Connect

    Plodinec, M.J.

    1992-08-24

    The DWPF is currently carrying out a Startup Test Program which will lead to radioactive operations in the facility. The objective of a significant portion of this program is to demonstrate that the DWPF can reliably make glass which satisfies DOE`s product specifications. This objective will be achieved through a series of integrated process campaigns using feeds of various compositions (the Qualification Runs).2 During these campaigns, the DWPF Glass Product Control Programs (GPCP) will be used to ensure that glass is made which meets specifications. The GPCP uses a correlation between glass composition and leach test results to determine whether a particular batch of feed will make acceptable glass (i.e., glass which will meet the specifications).

  3. Waste acceptance and the DWPF Startup Test Program: Impacts of process changes

    SciTech Connect

    Plodinec, M.J.

    1992-08-24

    The DWPF is currently carrying out a Startup Test Program which will lead to radioactive operations in the facility. The objective of a significant portion of this program is to demonstrate that the DWPF can reliably make glass which satisfies DOE's product specifications. This objective will be achieved through a series of integrated process campaigns using feeds of various compositions (the Qualification Runs).2 During these campaigns, the DWPF Glass Product Control Programs (GPCP) will be used to ensure that glass is made which meets specifications. The GPCP uses a correlation between glass composition and leach test results to determine whether a particular batch of feed will make acceptable glass (i.e., glass which will meet the specifications).

  4. 40 CFR 60.2541 - In lieu of a state plan submittal, are there other acceptable option(s) for a state to meet its...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... there other acceptable option(s) for a state to meet its Clean Air Act section 111(d)/129(b)(2... of a state plan submittal, are there other acceptable option(s) for a state to meet its Clean Air Act section 111(d)/129(b)(2) obligations? Yes, a state may meet its Clean Air Act section...

  5. 40 CFR 60.2541 - In lieu of a state plan submittal, are there other acceptable option(s) for a state to meet its...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... there other acceptable option(s) for a state to meet its Clean Air Act section 111(d)/129(b)(2... of a state plan submittal, are there other acceptable option(s) for a state to meet its Clean Air Act section 111(d)/129(b)(2) obligations? Yes, a state may meet its Clean Air Act section...

  6. 40 CFR 60.2541 - In lieu of a state plan submittal, are there other acceptable option(s) for a state to meet its...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... there other acceptable option(s) for a state to meet its Clean Air Act section 111(d)/129(b)(2... of a state plan submittal, are there other acceptable option(s) for a state to meet its Clean Air Act section 111(d)/129(b)(2) obligations? Yes, a state may meet its Clean Air Act section...

  7. 7. PHOTOCOPY, PLANS, ELEVATIONS, AND SECTION DRAWING FOR MISSILE TEST ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. PHOTOCOPY, PLANS, ELEVATIONS, AND SECTION DRAWING FOR MISSILE TEST AND ASSEMBLY BUILDING. - NIKE Missile Base SL-40, Missile Test & Assembly Building, South end of launch area, northeast of Generator Building No. 3, Hecker, Monroe County, IL

  8. Mod-2 wind turbine project assessment and cluster test plans

    NASA Technical Reports Server (NTRS)

    Gordon, L. H.

    1982-01-01

    An assessment of the Mod-2 Wind Turbine project is presented based on initial goals and present results. Specifically, the Mod-2 background, project flow, and a chronology of events/results leading to Mod-2 acceptance is presented. After checkout/acceptance of the three operating turbines, NASA/LeRC will continue management of a two year test program performed at the DOE Goodnoe Hills test site. This test program is expected to yield data necessary for the continued development and optimization of wind energy systems. These test activities, the implementation of, and the results to date are also presented.

  9. 49 CFR 238.107 - Inspection, testing, and maintenance plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... plan that relates to employee working conditions. (d) The inspection, testing, and maintenance plan... this section is not intended to address and should not include procedures to address employee working conditions that arise in the course of conducting the inspections, tests, and maintenance set forth in...

  10. 49 CFR 238.107 - Inspection, testing, and maintenance plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... plan that relates to employee working conditions. (d) The inspection, testing, and maintenance plan... this section is not intended to address and should not include procedures to address employee working conditions that arise in the course of conducting the inspections, tests, and maintenance set forth in...

  11. Detailed Test Plan Redundant Sensor Strapdown IMU Evaluation Program

    NASA Technical Reports Server (NTRS)

    Hartwell, T.; Miyatake, Y.; Wedekind, D. E.

    1971-01-01

    The test plan for a redundant sensor strapdown inertial measuring unit evaluation program is presented. The subjects discussed are: (1) test philosophy and limitations, (2) test sequence, (3) equipment specifications, (4) general operating procedures, (5) calibration procedures, (6) alignment test phase, and (7) navigation test phase. The data and analysis requirements are analyzed.

  12. Aeronautical Mobile Satellite Service (AMSS) Test Plan

    DTIC Science & Technology

    1991-05-01

    ICAO ) . It also contains a description of the Communications Test Facility (CTF) which will be used to perform the tests. An appendix includes a brief description of each test to be performed along with setup and data to be recorded.

  13. Audio Development Laboratory (ADL) User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Romero, Andy

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ADL. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  14. Chamber B Thermal/Vacuum Chamber: User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Montz, Mike E.

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of Chamber B. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  15. Multi-EMR Structured Data Entry Form: User-Acceptance Testing of a Prototype.

    PubMed

    Zavar, Abbas; Keshavjee, Karim

    2017-01-01

    Capturing standardized data from multiple EMRs at the point of care is highly desirable for a variety of uses, including quality improvement programs, multi-centered clinical trials and clinical decision support. In this paper, we describe the design, development and user acceptance testing of a prototype web-based form (the Form) that can integrate with multiple EMRs. We used the validated UTAUT questionnaire to assess the likelihood of uptake of the Form into clinical practice. The Form was found to be easy to use, elicits low anxiety, supports productivity and is perceived to have good support. Users would benefit from training and from better social signaling about the importance of using the Form in their practice. Making the Form more fun and interesting could help increase uptake.

  16. Full-Scale Cask Testing and Public Acceptance of Spent Nuclear Fuel Shipments - 12254

    SciTech Connect

    Dilger, Fred; Halstead, Robert J.; Ballard, James D.

    2012-07-01

    Full-scale physical testing of spent fuel shipping casks has been proposed by the National Academy of Sciences (NAS) 2006 report on spent nuclear fuel transportation, and by the Presidential Blue Ribbon Commission (BRC) on America's Nuclear Future 2011 draft report. The U.S. Nuclear Regulatory Commission (NRC) in 2005 proposed full-scale testing of a rail cask, and considered 'regulatory limits' testing of both rail and truck casks (SRM SECY-05-0051). The recent U.S. Department of Energy (DOE) cancellation of the Yucca Mountain project, NRC evaluation of extended spent fuel storage (possibly beyond 60-120 years) before transportation, nuclear industry adoption of very large dual-purpose canisters for spent fuel storage and transport, and the deliberations of the BRC, will fundamentally change assumptions about the future spent fuel transportation system, and reopen the debate over shipping cask performance in severe accidents and acts of sabotage. This paper examines possible approaches to full-scale testing for enhancing public confidence in risk analyses, perception of risk, and acceptance of spent fuel shipments. The paper reviews the literature on public perception of spent nuclear fuel and nuclear waste transportation risks. We review and summarize opinion surveys sponsored by the State of Nevada over the past two decades, which show consistent patterns of concern among Nevada residents about health and safety impacts, and socioeconomic impacts such as reduced property values along likely transportation routes. We also review and summarize the large body of public opinion survey research on transportation concerns at regional and national levels. The paper reviews three past cask testing programs, the way in which these cask testing program results were portrayed in films and videos, and examines public and official responses to these three programs: the 1970's impact and fire testing of spent fuel truck casks at Sandia National Laboratories, the 1980's

  17. Nevada Test Site Resource Management Plan: Annual summary, January 2000

    SciTech Connect

    2000-01-01

    The Nevada Test Site Resource Management Plan published in December of 1998 (DOE/NV--518) describes the Nevada Test Site stewardship mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. As part of the Nevada Test Site Resource Management Plan, DOE Nevada Operations Office has committed to perform and publish an annual summary review of DOE Nevada Operations' stewardship of the Nevada Test Site. This annual summary includes a description of progress made toward the goals of the Nevada Test Site Resource Management Plan, pertinent monitoring data, actions that were taken to adapt to changing conditions, and any other changes to the Nevada Test Site Resource Management Plan.

  18. Intentions to seek and accept an HIV test among men of Mexican descent in the Midwestern USA.

    PubMed

    Glasman, Laura R; Weinhardt, Lance S; Difranceisco, Wayne; Hackl, Kristin L

    2010-06-01

    In the USA, a high proportion of men of Mexican descent (MMD) test for HIV late in the course of the infection and miss opportunities for prevention. Given the need to promote timely HIV testing among MMD, we studied how MMD's motivations and previous experiences with disease prevention influence their intentions to seek (i.e., client-initiated HIV testing) and accept (i.e., provider-initiated HIV testing) an HIV test. We conducted a survey (N=302) at a large Mexican festival in the Midwestern USA. We elicited MMD's sexual risk behavior, social norms and culturally supported HIV testing expectations, previous experiences with disease prevention, and their intentions to seek and accept a free HIV test. Forty-one percent of MMD intended to actively seek an HIV test and 70% said they would accept it from a provider. Multivariate analyses indicated that MMD's intentions to seek and intentions to accept an HIV test were stronger when they expected desirable outcomes of an HIV test, including benefits for their family and community. Whereas MMD's intentions to actively seek an HIV test were stronger when they had more previous experiences with disease prevention and normative support, their intentions to accept an HIV test from a provider were stronger when they expected less negative outcomes from testing for HIV (e.g., stigma). Provider-initiated HIV testing may improve HIV testing access, particularly among MMD with lower experience and support. However, efforts to promote provider-initiated HIV testing among MMD should challenge negative HIV testing expectations and associate HIV testing with positive outcomes.

  19. Treatability Test Plan for an In Situ Biostimulation Reducing Barrier

    SciTech Connect

    Truex, Michael J.; Vermeul, Vince R.; Long, Philip E.; Brockman, Fred J.; Oostrom, Mart; Hubbard, Susan; Borden, Robert C.; Fruchter, Jonathan S.

    2007-07-21

    This treatability test plan supports a new, integrated strategy to accelerate cleanup of chromium in the Hanford 100 Areas. This plan includes performing a field-scale treatability test for bioreduction of chromate, nitrate, and dissolved oxygen. In addition to remediating a portion of the plume and demonstrating reduction of electron acceptors in the plume, the data from this test will be valuable for designing a full-scale bioremediation system to apply at this and other chromium plumes at Hanford.

  20. Aeronautical Mobile Satellite Service (AMSS) test plan

    NASA Astrophysics Data System (ADS)

    Sandlin, Sean M.

    1991-05-01

    A test program is described which will be conducted by the Federal Aviation Administration to support the validation of Standards and Recommended Practices being developed for the Aeronautical Mobile Satellite Service by the International Civil Aviation Organization. A description of the Communication Test Facility is also presented which will be used to perform the tests. A brief description is also included of each test to be performed along with setup and data to be recorded.

  1. 30 CFR 282.23 - Testing Plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... techniques or technology or mining equipment, or to determine environmental effects by a pilot test mining... commercial fishing. (n) A description of potential environmental impacts of testing activities including the... potential environmental impacts of the proposed testing activities and the domestic socioeconomic effects...

  2. Fast Flux Test Facility (FFTF) standby plan

    SciTech Connect

    Hulvey, R.K.

    1997-03-06

    The FFTF Standby Plan, Revision 0, provides changes to the major elements and project baselines to maintain the FFTF plant in a standby condition and to continue washing sodium from irradiated reactor fuel. The Plan is consistent with the Memorandum of Decision approved by the Secretary of Energy on January 17, 1997, which directed that FFTF be maintained in a standby condition to permit the Department to make a decision on whether the facility should play a future role in the Department of Energy`s dual track tritium production strategy. This decision would be made in parallel with the intended December 1998 decision on the selection of the primary, long- term source of tritium. This also allows the Department to review the economic and technical feasibility of using the FFTF to produce isotopes for the medical community. Formal direction has been received from DOE-RL and Fluor 2020 Daniel Hanford to implement the FFTF standby decision. The objective of the Plan is maintain the condition of the FFTF systems, equipment and personnel to preserve the option for plant restart within three and one-half years of a decision to restart, while continuing deactivation work which is consistent with the standby mode.

  3. Satellite Verification Planning: Best Practices and Pitfalls Related to Testing

    NASA Astrophysics Data System (ADS)

    Tosney, William F.; Pavlica, S.

    2004-08-01

    Satellite system verification planning is an intensive system engineering process requiring a highly disciplined and coordinated effort among the system engineers involved in requirements generation and flowdown, and engineers involved in the design, test and evaluation, and overall program planning functions. With the recent resurgence in the space industry of more disciplined acquisition and development practices, this paper discusses critical elements of a disciplined verification planning process, as embodied in a variety of space industry specifications, standards, and best practices, with an emphasis on the test planning function. Included in this paper is a look at the criticality of understanding mission operations in verification planning activities. This includes an emphasis on rigorously assessing the need for operational scenario testing under simulated environmental conditions. With increases in satellite complexity, assessing the role of modeling and simulation early in the verification planning process has become a key part of assuring a successful test plan during development. Best practices aimed at avoiding downstream design, production and operational problems are discussed along with common pitfalls and suggestions for improving the technical rigor in the verification planning process, testing execution, and programmatic policies aimed at improving development schedule realism and ultimately, improving mission success.

  4. Acceptability and feasibility of HIV self-testing among men who have sex with men in Peru and Brazil

    PubMed Central

    Volk, Jonathan E; Lippman, Sheri A; Grinsztejn, Beatriz; Lama, Javier R; Fernandes, Nilo M; Gonzales, Pedro; Hessol, Nancy A; Buchbinder, Susan

    2015-01-01

    HIV self-testing has the potential to increase testing frequency and uptake. This pilot study assessed the feasibility and acceptability of HIV self-testing in a sample of sexually active men who have sex with men in Peru and Brazil. Participants were trained to use a whole blood rapid HIV self-test and instructed to use the self-test monthly during this three-month study. Test acceptability was measured with self-reported use of the test at the one-month and three-month study visits, and test feasibility was assessed by direct observation of self-test administration at the final three-month visit. A total of 103 participants (52 in Peru and 51 in Brazil) were enrolled, and 86% completed the three-month study. Nearly all participants reported use of the self-test (97% at one-month and 98% at three-month visit), and all participants correctly interpreted the self-administered test results when observed using the test at the final study visit. HIV self-testing with a blood-based assay was highly acceptable and feasible. HIV self-testing may have the potential to increase testing frequency and to reach high-risk men who have sex with men not currently accessing HIV-testing services. PMID:25971262

  5. Test Plan for Cask Identification Detector

    SciTech Connect

    Rauch, Eric Benton

    2016-09-29

    This document serves to outline the testing of a Used Fuel Cask Identification Detector (CID) currently being designed under the DOE-NE MPACT Campaign. A bench-scale prototype detector will be constructed and tested using surrogate neutron sources. The testing will serve to inform the design of the full detector that is to be used as a way of fingerprinting used fuel storage casks based on the neutron signature produced by the used fuel inside the cask.

  6. Long-term corrosion testing plan.

    SciTech Connect

    Wall, Frederick Douglas; Brown, Neil R.

    2009-02-01

    This document describes the testing and facility requirements to support the Yucca Mountain Project long-term corrosion testing program. The purpose of this document is to describe a corrosion testing program that will (a) reduce model uncertainty and variability, (b) reduce the reliance upon overly conservative assumptions, and (c) improve model defensibility. Test matrices were developed for 17 topical areas (tasks): each matrix corresponds to a specific test activity that is a subset of the total work performed in a task. A future document will identify which of these activities are considered to be performance confirmation activities. Detailed matrices are provided for FY08, FY09 and FY10 and rough order estimates are provided for FY11-17. Criteria for the selection of appropriate test facilities were developed through a meeting of Lead Lab and DOE personnel on October 16-17, 2007. These criteria were applied to the testing activities and recommendations were made for the facility types appropriate to carry out each activity. The facility requirements for each activity were assessed and activities were identified that can not be performed with currently available facilities. Based on this assessment, a total of approximately 10,000 square feet of facility space is recommended to accommodate all future testing, given that all testing is consolidated to a single location. This report is a revision to SAND2008-4922 to address DOE comments.

  7. Youth Fitness Testing: Validation, Planning, and Politics.

    ERIC Educational Resources Information Center

    Franks, B. Don; And Others

    1988-01-01

    The article outlines the physiological and measurement bases for the development of physical fitness tests, raising questions concerning physiological, psychological, and evaluation issues. (Author/CB)

  8. Airborne Data Link Operational Evaluation Test Plan

    DTIC Science & Technology

    1993-08-01

    Peg* 1. Rep meft .2. Gowe,; , Accessio, No. 3. Recspsent’s Catel " No. DOT/FAA/CT-TN93/30 I 4. Title and Subtite 5. Roep,, .t. AIRBORNE DATA LINK...320 15. Supplementary Notes 16 . Abstract This plan desci. s an end-to-end study of operational concepts and procedures associated with the introduction...4.4 Dependent Measures 9 4.5 ATC Messages 14 4.6 Flight Scenarios 14 4.7 Support Personnel 15 4.8 Data Reduction and Analysis 16 5. SCHEDULE 16 5.1

  9. R&D Plan for RISMC Industry Application #1: ECCS/LOCA Cladding Acceptance Criteria

    SciTech Connect

    Szilard, Ronaldo Henriques; Zhang, Hongbin; Epiney, Aaron Simon; Tu, Lei

    2016-04-01

    The Nuclear Regulatory Commission (NRC) is finalizing a rulemaking change that would revise the requirements in 10 CFR 50.46. In the proposed new rulemaking, designated as 10 CFR 50.46c, the NRC proposes a fuel performance-based equivalent cladding reacted (ECR) criterion as a function of cladding hydrogen content before the accident (pre-transient) in order to include the effects of higher burnup on cladding performance as well as to address other technical issues. A loss of operational margin may result due to the more restrictive cladding embrittlement criteria. Initial and future compliance with the rule may significantly increase vendor workload and licensee costs as a spectrum of fuel rod initial burnup states may need to be analyzed to demonstrate compliance. The Idaho National Laboratory (INL) has initiated a project, as part of the DOE Light Water Reactor Sustainability Program (LWRS), to develop analytical capabilities to support the industry in the transition to the new rule. This project is called the Industry Application 1 (IA1) within the Risk-Informed Safety Margin Characterization (RISMC) Pathway of LWRS. The general idea behind the initiative is the development of an Integrated Evaluation Model (IEM). The motivation is to develop a multiphysics framework to analyze how uncertainties are propagated across the stream of physical disciplines and data involved, as well as how risks are evaluated in a LOCA safety analysis as regulated under 10 CFR 50.46c. This IEM is called LOTUS which stands for LOCA Toolkit for US, and it represents the LWRS Program’s response to the proposed new rule making. The focus of this report is to complete an R&D plan to describe the demonstration of the LOCA/ECCS RISMC Industry Application # 1 using the advanced RISMC Toolkit and methodologies. This report includes the description and development plan for a RISMC LOCA tool that fully couples advanced MOOSE tools already in development in order to characterize and optimize

  10. Wireless Fetal Heart Rate Monitoring in Inpatient Full-Term Pregnant Women: Testing Functionality and Acceptability

    PubMed Central

    Boatin, Adeline A.; Wylie, Blair; Goldfarb, Ilona; Azevedo, Robin; Pittel, Elena; Ng, Courtney; Haberer, Jessica

    2015-01-01

    We tested functionality and acceptability of a wireless fetal monitoring prototype technology in pregnant women in an inpatient labor unit in the United States. Women with full-term singleton pregnancies and no evidence of active labor were asked to wear the prototype technology for 30 minutes. We assessed functionality by evaluating the ability to successfully monitor the fetal heartbeat for 30 minutes, transmit this data to Cloud storage and view the data on a web portal. Three obstetricians also rated fetal cardiotocographs on ease of readability. We assessed acceptability by administering closed and open-ended questions on perceived utility and likeability to pregnant women and clinicians interacting with the prototype technology. Thirty-two women were enrolled, 28 of whom (87.5%) successfully completed 30 minutes of fetal monitoring including transmission of cardiotocographs to the web portal. Four sessions though completed, were not successfully uploaded to the Cloud storage. Six non-study clinicians interacted with the prototype technology. The primary technical problem observed was a delay in data transmission between the prototype and the web portal, which ranged from 2 to 209 minutes. Delays were ascribed to Wi-Fi connectivity problems. Recorded cardiotocographs received a mean score of 4.2/5 (± 1.0) on ease of readability with an interclass correlation of 0.81(95%CI 0.45, 0.96). Both pregnant women and clinicians found the prototype technology likable (81.3% and 66.7% respectively), useful (96.9% and 66.7% respectively), and would either use it again or recommend its use to another pregnant woman (77.4% and 66.7% respectively). In this pilot study we found that this wireless fetal monitoring prototype technology has potential for use in a United States inpatient setting but would benefit from some technology changes. We found it to be acceptable to both pregnant women and clinicians. Further research is needed to assess feasibility of using this

  11. Wireless fetal heart rate monitoring in inpatient full-term pregnant women: testing functionality and acceptability.

    PubMed

    Boatin, Adeline A; Wylie, Blair; Goldfarb, Ilona; Azevedo, Robin; Pittel, Elena; Ng, Courtney; Haberer, Jessica

    2015-01-01

    We tested functionality and acceptability of a wireless fetal monitoring prototype technology in pregnant women in an inpatient labor unit in the United States. Women with full-term singleton pregnancies and no evidence of active labor were asked to wear the prototype technology for 30 minutes. We assessed functionality by evaluating the ability to successfully monitor the fetal heartbeat for 30 minutes, transmit this data to Cloud storage and view the data on a web portal. Three obstetricians also rated fetal cardiotocographs on ease of readability. We assessed acceptability by administering closed and open-ended questions on perceived utility and likeability to pregnant women and clinicians interacting with the prototype technology. Thirty-two women were enrolled, 28 of whom (87.5%) successfully completed 30 minutes of fetal monitoring including transmission of cardiotocographs to the web portal. Four sessions though completed, were not successfully uploaded to the Cloud storage. Six non-study clinicians interacted with the prototype technology. The primary technical problem observed was a delay in data transmission between the prototype and the web portal, which ranged from 2 to 209 minutes. Delays were ascribed to Wi-Fi connectivity problems. Recorded cardiotocographs received a mean score of 4.2/5 (± 1.0) on ease of readability with an interclass correlation of 0.81(95%CI 0.45, 0.96). Both pregnant women and clinicians found the prototype technology likable (81.3% and 66.7% respectively), useful (96.9% and 66.7% respectively), and would either use it again or recommend its use to another pregnant woman (77.4% and 66.7% respectively). In this pilot study we found that this wireless fetal monitoring prototype technology has potential for use in a United States inpatient setting but would benefit from some technology changes. We found it to be acceptable to both pregnant women and clinicians. Further research is needed to assess feasibility of using this

  12. Joint Integration Test Facility (JITF) Engineering II Performance Measurement Plans

    DTIC Science & Technology

    2001-10-01

    Technology Management Reform Act of 1966 (also known as the Clinger-Cohen Act) and the Government Performance and Results Act of 1997, which requires...This report contains the performance measurement plan for the Joint Integration Test Facility. This is an initial plan to comply with the Information

  13. 46 CFR 162.060-24 - Test Plan requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., data acquisition, and analysis plan, including all necessary procedures. (10) Data management, analysis...: SPECIFICATIONS AND APPROVAL ENGINEERING EQUIPMENT Ballast Water Management Systems § 162.060-24 Test Plan... installation, calibration, maintenance, and operations that will be used by the ballast water management...

  14. 46 CFR 162.060-24 - Test Plan requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., data acquisition, and analysis plan, including all necessary procedures. (10) Data management, analysis...: SPECIFICATIONS AND APPROVAL ENGINEERING EQUIPMENT Ballast Water Management Systems § 162.060-24 Test Plan... installation, calibration, maintenance, and operations that will be used by the ballast water management...

  15. 46 CFR 162.060-24 - Test Plan requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., data acquisition, and analysis plan, including all necessary procedures. (10) Data management, analysis...: SPECIFICATIONS AND APPROVAL ENGINEERING EQUIPMENT Ballast Water Management Systems § 162.060-24 Test Plan... installation, calibration, maintenance, and operations that will be used by the ballast water management...

  16. Nevada Test Site Treatment Plan. Revision 2

    SciTech Connect

    1996-03-01

    Treatment Plans (STPS) are required for facilities at which the US Department of Energy (DOE) or stores mixed waste, defined by the Federal Facility Compliance Act (FFCAct) as waste containing both a hazardous waste subject to the Resource Conservation and Recovery Act and a radioactive material subject to the Atomic Energy Act. On April 6, 1993, DOE published a Federal Register notice (58 FR 17875) describing its proposed process for developing the STPs in three phases including a Conceptual, a Draft, and a Proposed Site Treatment Plan (PSTP). All of the DOE Nevada Operations Office STP iterations have been developed with the state of Nevada`s input. The options and schedules reflect a ``bottoms-up`` approach and have been evaluated for impacts on other DOE sites, as well as impacts to the overall DOE program. Changes may have occurred in the preferred option and associated schedules between the PSTP, which was submitted to the state of Nevada and US Environmental Protection Agency April 1995, and the Final STP (hereafter referred to as the STP) as treatment evaluations progressed. The STP includes changes that have occurred since the submittal of the PSTP as a result of state-to-state and DOE-to-state discussions.

  17. DiAlert: a prevention program for overweight first degree relatives of type 2 diabetes patients: results of a pilot study to test feasibility and acceptability

    PubMed Central

    2012-01-01

    Background Prevalence of type 2 diabetes mellitus is increasing due to lifestyle changes, particularly affecting those genetically at risk. We developed DiAlert as a targeted group-based intervention aimed to promote intrinsic motivation and action planning for lifestyle changes and weight loss in first degree relatives of patients with type 2 diabetes mellitus. The main objective of the pilot of the DiAlert intervention was to assess fidelity, feasibility and acceptability prior to starting the randomized controlled trial. Methods Individuals with a family history of type 2 diabetes mellitus were self-identified and screened for eligibility. DiAlert consists of two group sessions. Feasibility, fidelity, acceptability and self-reported perceptions and behavioral determinants were evaluated in a pre-post study using questionnaires and observations. Determinants of behavior change were analyzed using paired-samples t tests and Wilcoxon signed rank tests. Results DiAlert was delivered to two groups of first degree relatives of patients with type 2 diabetes mellitus (N = 9 and N = 12). Feasibility and fidelity were confirmed. Overall, the DiAlert group sessions were positively evaluated (8.0 on a scale of 1 to 10) by participants. The intervention did not impact perceived susceptibility or worry about personal diabetes risk. Action planning with regard to changing diet and physical activity increased. Conclusions DiAlert proved feasible and was well-accepted by participants. Positive trends in action planning indicate increased likelihood of actual behavior change following DiAlert. Testing the effectiveness in a randomized controlled trial is imperative. Trial registration Netherlands National Trial Register (NTR): NTR2036 PMID:23013843

  18. SU-E-T-269: Differential Hazard Analysis For Conventional And New Linac Acceptance Testing Procedures

    SciTech Connect

    Harry, T; Yaddanapudi, S; Mutic, S; Cai, B; Goddu, S; Noel, C; Pawlicki, T

    2015-06-15

    Purpose: New techniques and materials have recently been developed to expedite the conventional Linac Acceptance Testing Procedure (ATP). The new ATP method uses the Electronic Portal Imaging Device (EPID) for data collection and is presented separately. This new procedure is meant to be more efficient then conventional methods. While not clinically implemented yet, a prospective risk assessment is warranted for any new techniques. The purpose of this work is to investigate the risks and establish the pros and cons between the conventional approach and the new ATP method. Methods: ATP tests that were modified and performed with the EPID were analyzed. Five domain experts (Medical Physicists) comprised the core analysis team. Ranking scales were adopted from previous publications related to TG 100. The number of failure pathways for each ATP test procedure were compared as well as the number of risk priority numbers (RPN’s) greater than 100 were compared. Results: There were fewer failure pathways with the new ATP compared to the conventional, 262 and 556, respectively. There were fewer RPN’s > 100 in the new ATP compared to the conventional, 41 and 115. Failure pathways and RPN’s > 100 for individual ATP tests on average were 2 and 3.5 times higher in the conventional ATP compared to the new, respectively. The pixel sensitivity map of the EPID was identified as a key hazard to the new ATP procedure with an RPN of 288 for verifying beam parameters. Conclusion: The significant decrease in failure pathways and RPN’s >100 for the new ATP mitigates the possibilities of a catastrophic error occurring. The Pixel Sensitivity Map determining the response and inherent characteristics of the EPID is crucial as all data and hence results are dependent on that process. Grant from Varian Medical Systems Inc.

  19. Scaling of Lift Degradation Due to Anti-Icing Fluids Based Upon the Aerodynamic Acceptance Test

    NASA Technical Reports Server (NTRS)

    Broeren, Andy P.; Riley, James T.

    2012-01-01

    In recent years, the FAA has worked with Transport Canada, National Research Council Canada (NRC) and APS Aviation, Inc. to develop allowance times for aircraft operations in ice-pellet precipitation. These allowance times are critical to ensure safety and efficient operation of commercial and cargo flights. Wind-tunnel testing with uncontaminated anti-icing fluids and fluids contaminated with simulated ice pellets had been carried out at the NRC Propulsion and Icing Wind Tunnel (PIWT) to better understand the flowoff characteristics and resulting aerodynamic effects. The percent lift loss on the thin, high-performance wing model tested in the PIWT was determined at 8 angle of attack and used as one of the evaluation criteria in determining the allowance times. Because it was unclear as to how performance degradations measured on this model were relevant to an actual airplane configuration, some means of interpreting the wing model lift loss was deemed necessary. This paper describes how the lift loss was related to the loss in maximum lift of a Boeing 737-200ADV airplane through the Aerodynamic Acceptance Test (AAT) performed for fluids qualification. A loss in maximum lift coefficient of 5.24 percent on the B737-200ADV airplane (which was adopted as the threshold in the AAT) corresponds to a lift loss of 7.3 percent on the PIWT model at 8 angle of attack. There is significant scatter in the data used to develop the correlation related to varying effects of the anti-icing fluids that were tested and other factors. A statistical analysis indicated the upper limit of lift loss on the PIWT model was 9.2 percent. Therefore, for cases resulting in PIWT model lift loss from 7.3 to 9.2 percent, extra scrutiny of the visual observations is required in evaluating fluid performance with contamination.

  20. Scaling of Lift Degradation Due to Anti-Icing Fluids Based Upon the Aerodynamic Acceptance Test

    NASA Technical Reports Server (NTRS)

    Broeren, Andy; Riley, Jim

    2012-01-01

    In recent years, the FAA has worked with Transport Canada, National Research Council Canada (NRC) and APS Aviation, Inc. to develop allowance times for aircraft operations in ice-pellet precipitation. These allowance times are critical to ensure safety and efficient operation of commercial and cargo flights. Wind-tunnel testing with uncontaminated anti-icing fluids and fluids contaminated with simulated ice pellets had been carried out at the NRC Propulsion and Icing Wind Tunnel (PIWT) to better understand the flow-off characteristics and resulting aerodynamic effects. The percent lift loss on the thin, high-performance wing model tested in the PIWT was determined at 8 deg. angle of attack and used as one of the evaluation criteria in determining the allowance times. Because it was unclear as to how performance degradations measured on this model were relevant to an actual airplane configuration, some means of interpreting the wing model lift loss was deemed necessary. This paper describes how the lift loss was related to the loss in maximum lift of a Boeing 737-200ADV airplane through the Aerodynamic Acceptance Test (AAT) performed for fluids qualification. A loss in maximum lift coefficient of 5.24% on the B737-200ADV airplane (which was adopted as the threshold in the AAT) corresponds to a lift loss of 7.3% on the PIWT model at 8 deg. angle of attack. There is significant scatter in the data used to develop the correlation related to varying effects of the anti-icing fluids that were tested and other factors. A statistical analysis indicated the upper limit of lift loss on the PIWT model was 9.2%. Therefore, for cases resulting in PIWT model lift loss from 7.3% to 9.2%, extra scrutiny of the visual observations is required in evaluating fluid performance with contamination.

  1. Acceptability of rapid oral fluid HIV testing among male injection drug users in Taiwan, 1997 and 2007.

    PubMed

    Lyu, Shu-Yu; Morisky, Donald E; Yeh, Ching-Ying; Twu, Shiing-Jer; Peng, Eugene Yu-Chang; Malow, Robert M

    2011-04-01

    Rapid oral fluid HIV testing (rapid oral testing) is in the process of being adapted in Taiwan and elsewhere given its advantages over prior HIV testing methods. To guide this process, we examined the acceptability of rapid oral testing at two time points (i.e., 1997 and 2007) among one of the highest risk populations, male injection drug users (IDUs). For this purpose, an anonymous self-administered survey was completed by HIV-negative IDUs involved in the criminal justice system in 1997 (N (1)=137 parolees) and 2007 (N (2)=106 prisoners). A social marketing model helped guide the design of our questionnaire to assess the acceptability of rapid oral testing. This included assessing a new product, across four marketing dimensions: product, price, promotion, and place. Results revealed that in both 1997 and 2007, over 90% indicated that rapid oral testing would be highly acceptable, particularly if the cost was under US$6, and that a pharmacy would be the most appropriate and accessible venue for selling the rapid oral testing kits. The vast majority of survey respondents believed that the cost of rapid oral testing should be federally subsidized and that television and newspaper advertisements would be the most effective media to advertise for rapid oral testing. Both the 1997 and 2007 surveys suggested that rapid oral HIV testing would be particularly accepted in Taiwan by IDUs after release from the criminal justice system.

  2. Results of the NASA Kennedy Space Center 50-MHz Doppler Radar Wind Profiler Operational Acceptance Test

    NASA Technical Reports Server (NTRS)

    Barbre', Robert E., Jr.; Decker, Ryan K.; Leahy, Frank B.; Huddleston, Lisa

    2016-01-01

    This paper presents results of the new Kennedy Space Center (KSC) 50-MHz Doppler Radar Wind Profiler (DRWP) Operational Acceptance Test (OAT). The goal of the OAT was to verify the data quality of the new DRWP against the performance of the previous DRWP in order to use wind data derived by the new DRWP for space launch vehicle operations support at the Eastern Range. The previous DRWP was used as a situational awareness asset for mission operations to identify rapid changes in the wind environment that weather balloons cannot depict. The Marshall Space Flight Center's Natural Environments Branch assessed data from the new DRWP collected during Jan-Feb 2015 against a specified set of test criteria. Data examination verified that the DRWP provides complete profiles every five minutes from 1.8-19.5 km in vertical increments of 150 m. Analysis of 49 concurrent DRWP and balloon profiles presented root mean square wind component differences around 2.0 m/s. Evaluation of the DRWP's coherence between five-minute wind pairs found the effective vertical resolution to be Nyquist-limited at 300 m for both wind components. In addition, the sensitivity to rejecting data that do not have adequate signal was quantified. This paper documents the data, quality control procedures, methodology, and results of each analysis.

  3. CID-720 aircraft Langley Research Center preflight hardware tests: Development, flight acceptance and qualification

    NASA Technical Reports Server (NTRS)

    Pride, J. D.

    1986-01-01

    The testing conducted on LaRC-developed hardware for the controlled impact demonstration transport aircraft is discussed. To properly develop flight qualified crash systems, two environments were considered: the aircraft flight environment with the focus on vibration and temperature effects, and the crash environment with the long pulse shock effects. Also with the large quantity of fuel in the wing tanks the possibility of fire was considered to be a threat to data retrieval and thus fire tests were included in the development test process. The aircraft test successfully demonstrated the performance of the LaRC developed heat shields. Good telemetered data (S-band) was received during the impact and slide-out phase, and even after the aircraft came to rest. The two onboard DAS tape recorders were protected from the intense fire and high quality tape data was recovered. The complete photographic system performed as planned throughout the 40.0 sec of film supply. The four photo power distribution pallets remained in good condition and all ten onboard 16 mm high speed (400 frames/sec) cameras produced good film data.

  4. Fast Flux Test Facility project plan. Revision 2

    SciTech Connect

    Hulvey, R.K.

    1995-11-01

    The Fast Flux Test Facility (FFTF) Transition Project Plan, Revision 2, provides changes to the major elements and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition.

  5. Engineering data transfer test with EDCARS using MIL-R-28002 (Raster). Laboratory Acceptance Test and User Application Test

    SciTech Connect

    Not Available

    1992-04-17

    This paper documents the results of a sequence of tests conducted to evaluate the DoD Computer-aided Acquisition and Logistic Support (CALS) data interchange capability of the Air Force Engineering Data Computer-Assisted Retrieval System (EDCARS). The CALS initiative specifies a standard digital interface to streamline the interchange of technical data between the DoD and the commercial sector. The CALS Test Network (CTN) is tasked to conduct tests of military standards which specify this digital interface. The testing results outlined in this report are intended to evaluate the EDCARS systems`s ability to sport CALS data interchanges and establish the level of technical data interoperability implemented at this DoD engineering data repository.

  6. Sludge stabilization boat material test plan

    SciTech Connect

    De Vries, M.L.

    1995-04-05

    This document provides instructions for testing different types of potential boat materials in the HC-21C muffle furnace process. The boats must withstand corrosive environments at up to 1000 degrees C.

  7. ITS strategic test plan : revision 1.0.

    SciTech Connect

    Franke, Brian Claude; Lorence, Leonard Joseph, Jr.; Crawford, Martin James; Cordova, Lisa A.; Kensek, Ronald Patrick; Laub, Thomas William

    2004-07-01

    This test plan describes the testing strategy for the ITS (Integrated-TIGER-Series) suite of codes. The processes and procedures for performing both verification and validation tests are described. ITS Version 5.0 was developed under the NNSA's ASC program and supports Sandia's stockpile stewardship mission.

  8. Hanford tank waste supernatant cesium removal test plan

    SciTech Connect

    Hendrickson, D.W., Westinghouse Hanford

    1996-05-31

    This document provides the test plan for the preparation and conduct of a cesium removal test using Hanford DSSF supernatant liquor from tank 241-AW-101 in a bench-scale column. Cesium sorbents to be tested include resorcinol-formaldehyde resin and crystalline silicotitanate.

  9. Test plan for engineering scale electrostatic enclosure demonstration

    SciTech Connect

    Meyer, L.C.

    1993-02-01

    This test plan describes experimental details of an engineering-scale electrostatic enclosure demonstration to be performed at the Idaho National Engineering Laboratory in fiscal year (FY)-93. This demonstration will investigate, in the engineering scale, the feasibility of using electrostatic enclosures and devices to control the spread of contaminants during transuranic waste handling operations. Test objectives, detailed experimental procedures, and data quality objectives necessary to perform the FY-93 experiments are included in this plan.

  10. Test/QA Plan for Verification of Microcystin Test Kits

    EPA Science Inventory

    Microcystin test kits are used to quantitatively measure total microcystin in recreational waters. These test kits are based on enzyme-linked immunosorbent assays (ELISA) with antibodies that bind specifically to microcystins or phosphate activity inhibition where the phosphatas...

  11. Test plan for the 34 meter vertical axis wind turbine test bed located at Bushland, Texas

    SciTech Connect

    Stephenson, W.A.

    1986-12-01

    A plan is presented for the testing and evaluation of a new 500 kw vertical axis wind turbine test bed. The plan starts with the initial measurements made during construction, proceeds through evaluation of the design, the development of control methods, and finally to the test bed phase where new concepts are evaluated and in-depth studies are performed.

  12. Test results of the Phase 1 Test Plan

    SciTech Connect

    Hey, B.E.

    1995-03-01

    Radioactive waste materials in underground high level waste (HLW) storage tanks at the Hanford Site evolve gaseous mixtures at varying rates. In order to verify the flammability of these gases and the mechanisms by which they are produced, it is necessary to sample material from these tanks in such a way as to preserve the gas phase of the material for analysis. Careful laboratory studies could then be performed on these samples which would allow judgement to be made of the hazard level of the storage tank. The Retained Gas Sampler (RGS) system is such a sampling method. A multidisciplinary team developed and issued a plan to obtain waste tank core samples for gas phase analysis. This plan contained the basic idea and function of the RGS system. Different organizations assumed responsibility of various aspects of the RGS program which they were most qualified to develop.

  13. Waste Acceptance Testing of Secondary Waste Forms: Cast Stone, Ceramicrete and DuraLith

    SciTech Connect

    Mattigod, Shas V.; Westsik, Joseph H.; Chung, Chul-Woo; Lindberg, Michael J.; Parker, Kent E.

    2011-08-12

    To support the selection of a waste form for the liquid secondary wastes from WTP, Washington River Protection Solutions has initiated secondary-waste-form testing work at Pacific Northwest National Laboratory (PNNL). In anticipation of a down-selection process for a waste form for the Solidification Treatment Unit to be added to the ETF, PNNL is conducting tests on four candidate waste forms to evaluate their ability to meet potential waste acceptance criteria for immobilized secondary wastes that would be placed in the IDF. All three waste forms demonstrated compressive strengths above the minimum 3.45 MPa (500 psi) set as a target for cement-based waste forms. Further, none of the waste forms showed any significant degradation in compressive strength after undergoing thermal cycling (30 cycles in a 10 day period) between -40 C and 60 C or water immersion for 90 days. The three leach test methods are intended to measure the diffusion rates of contaminants from the waste forms. Results are reported in terms of diffusion coefficients and a leachability index (LI) calculated based on the diffusion coefficients. A smaller diffusion coefficient and a larger LI are desired. The NRC, in its Waste Form Technical Position (NRC 1991), provides recommendations and guidance regarding methods to demonstrate waste stability for land disposal of radioactive waste. Included is a recommendation to conduct leach tests using the ANS 16.1 method. The resulting leachability index (LI) should be greater than 6.0. For Hanford secondary wastes, the LI > 6.0 criterion applies to sodium leached from the waste form. For technetium and iodine, higher targets of LI > 9 for Tc and LI > 11 for iodine have been set based on early waste-disposal risk and performance assessment analyses. The results of these three leach tests conducted for a total time between 11days (ASTM C1308) to 90 days (ANS 16.1) showed: (1) Technetium diffusivity: ANSI/ANS 16.1, ASTM C1308, and EPA 1315 tests indicated that

  14. Space Shuttle stability and control test plan

    NASA Technical Reports Server (NTRS)

    Cooke, D. R.

    1982-01-01

    The development of a completely automatic flight test program to test different aspects of the Shuttle flight capability during reentries is described. Data from each flight to date has been employed to devise a sequence of maneuvers which will be keyboard-punched into the Orbiter control system by the astronauts during entry phases of flight. Details of the interaction and cooperation of the Orbiter elevons and bodyflap to provide the vehicle with latitudinal and longitudinal directional control and trim are outlined. Uncertainties predicted for the control of the Orbiter during wind tunnel testing prior to actual flights have been adjusted to actual flight data, leading to the identification of actual flight regimes which need further investigation. Maneuvers scheduled for flights 5-9 are reviewed.

  15. NCRF gun status and test plan

    SciTech Connect

    Nguyen, Dinh C

    2011-01-20

    Summary of this presentation are: (1) NCRF injector has achieved >7MV/m average gradients; (2) RGA trace shows little water in cathode cell; (3) NCRF injector has produced electron beams; (4) Dark current can be reduced with solenoid magnetic field; (5) An RF window failed at RF power above 800kW; (6) Beam tests will be performed with both RLWG (each exposed to 500kW of RF power); and (7) Beam tests will use CsK{sub 2}Sb photocathodes fabricated using low-temperature alkali sources.

  16. Gallium-cladding compatibility testing plan: Phase 3 -- Test plan for centrally heated surrogate rodlet test. Revision 2

    SciTech Connect

    Morris, R.N.; Baldwin, C.A.; Wilson, D.F.

    1998-07-01

    The Fissile Materials Disposition Program (FMDP) is investigating the use of weapons grade plutonium in mixed oxide (MOX) fuel for light-water reactors (LWR). Commercial MOX fuel has been successfully used in overseas reactors for many years; however, weapons derived fuel may differ from the previous commercial fuels because of small amounts of gallium impurities. A concern presently exists that the gallium may migrate out of the fuel, react with and weaken the clad, and thereby promote loss of fuel pin integrity. Phases 1 and 2 of the gallium task are presently underway to investigate the types of reactions that occur between gallium and clad materials. This is a Level-2 document as defined in the Fissile Materials Disposition Program Light-Water Reactor Mixed-Oxide Fuel Irradiation Test Project Plan. This Plan summarizes the projected Phase 3 Gallium-Cladding compatibility heating test and the follow-on post test examination (PTE). This work will be performed using centrally-heated surrogate pellets, to avoid unnecessary complexities and costs associated with working with plutonium and an irradiation environment. Two sets of rodlets containing pellets prepared by two different methods will be heated. Both sets will have an initial bulk gallium content of approximately 10 ppm. The major emphasis of the PTE task will be to examine the material interactions, particularly indications of gallium transport from the pellets to the clad.

  17. Plan for CELSS test bed project

    NASA Technical Reports Server (NTRS)

    Knott, W. M.

    1986-01-01

    The Closed Ecological Life Support Systems (CELSS) testbed project will achieve two major goals: It will develop the knowledge and technology needed to build and test biological or combined biological physiochemical regenerative life support systems. It will fabricate, test, and operate ground based facilities to accomplish proof-of-concent testing and evaluation leading to flight experimentation. The project will combine basic research and applied research/engineering to achieve a phased, integrated development of hardware, systems, and techniques for food and oxygen production, food processing, and waste processing in closed systems. The project will design, fabricate, and operate within three years a botanical production system scaled to a sufficient size to verify oxygen and nutrient load production (carbohydrates, fats, proteins) at a useable level. It will develop within five years a waste management system compatible with the botanical production system and a food processing system that converts available biomass into edible products. It will design, construct, and operate within ten years a ground based candidate CELSS that includes man as an active participant in the system. It will design a flight CELSS module within twelve years and construct and conduct initial flight tests within fifteen years.

  18. Nitrate Salt Surrogate Blending Scoping Test Plan

    SciTech Connect

    Anast, Kurt Roy

    2015-11-13

    Test blending equipment identified in the “Engineering Options Assessment Report: Nitrate Salt Waste Stream Processing”. Determine if the equipment will provide adequate mixing of zeolite and surrogate salt/Swheat stream; optimize equipment type and operational sequencing; impact of baffles and inserts on mixing performance; and means of validating mixing performance

  19. Test plan and technical protocol for bioslurping

    SciTech Connect

    Leeson, A.; Kittel, J.A.; Hinchee, R.E.; Miller, R.N.; Haas, P.E.; Hoeppel, R.E.

    1995-12-31

    Bioslurping is a new dynamic technology designed to efficiently recover free-floating petroleum hydrocarbons (free product) from the subsurface while simultaneously enhancing natural biodegradation of petroleum hydrocarbons in the vadose zone. Bioslurping is a vacuum-enhanced fluids-pumping technology that simultaneously extracts groundwater, free product, and soil gas in the same process stream. The US Air Force has initiated a multisite program to evaluate the widespread application of bioslurping at free-product-contaminated Air Force sites. The Air Force Bioslurper Initiative is designed to assess the field application of the bioslurping technology at 23 Air Force sites. The field studies are designed to evaluate the efficacy of bioslurping for the recovery of free-floating fuel (free product) and to evaluate the potential for bioventing to enhance natural biodegradation of petroleum contaminants. The technical approach for conducting the bioslurper pilot tests includes assessing the geologic and hydrologic characteristics of each site, free-product baildown testing in site monitoring wells, soil gas analysis, and a bioslurper pump test. The efficiency of bioslurping is compared to that of conventional skimming and dual-pump free-product recovery technologies. Bioventing potential is assessed via in situ respiration testing.

  20. 30 CFR 582.23 - Testing Plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... showing water depths and the locations of the proposed pilot mining or other testing activities. (d) A... taken to avoid, minimize, or otherwise mitigate air, land, and water pollution and damage to aquatic and...(c) of this part. (l) A detailed description of the cycle of all materials including samples...

  1. Test plan pressure fed thrust chamber technology

    NASA Technical Reports Server (NTRS)

    Dunn, Glenn

    1990-01-01

    Aerojet is developing the technology for the design of a reliable, low cost, efficient, and lightweight LOX/RP-1 pressure fed engine. This technology program is a direct result of Aerojet's liquid rocket booster (LRB) study and previous NASA studies that identified liquid engines using high bulk density hydrocarbon fuels as very attractive for a space transportation system (STS). Previous large thrust LOX/RP-1 engine development programs were characterized by costly development problems due to combustion instability damage. The combustion stability solution was typically obtained through trial and error methods of minimizing instability damage by degrading engine performance. The approach to this program was to utilize existing and newly developed combustion analysis models and design methodology to create a thrust chamber design with features having the potential of producing reliable and efficient operation. This process resulted in an engine design with a unique high thrust-per-element OFO triplet injector utilizing a low cost modular approach. Cost efficient ablative materials are baselined for the injector face and chamber. Technology demonstration will be accomplished through a hot fire test program using appropriately sized subscale hardware. This subscale testing will provide a data base to supplement the current industry data bank and to anchor and validate the applied analysis models and design methodology. Once anchored and validated, these analysis models and design methodology can be applied with greatly increased confidence to design and characterize a large scale pressure fed LOX/RP-1 thrust chamber. The objective of this test program is to generate a data base that can be used to anchor and validate existing analysis models and design methodologies and to provide early concept demonstration of a low cost, efficient LOX/RP-1 thrust chamber. Test conditions and hardware instrumentation were defined to provide data sufficient to characterize combustion

  2. Report on the Acceptance Test of the CRI Y-MP 8128, 10 February - 12 March 1990

    NASA Technical Reports Server (NTRS)

    Carter, Russell; Kutler, Paul (Technical Monitor)

    1998-01-01

    The NAS Numerical Aerodynamic Simulation Facility's HSP 2 computer system, a CRI Y-MP 832 SN #1002, underwent a major hardware upgrade in February of 1990. The 32 MWord, 6.3 ns mainframe component of the system was replaced with a 128 MWord, 6.0 ns CRI Y-MP 8128 mainframe, SN #1030. A 30 day Acceptance Test of the computer system was performed by the NAS RND HSP group from 08:00 February 10, 1990 to 08:00 March 12, 1990. Overall responsibility for the RND HSP Acceptance Test was assumed by Duane Carbon. The terms of the contract required that the SN #1030 achieve an effectiveness level of greater than or equal to ninety (90) percent for 30 consecutive days within a 60 day time frame. After the first thirty days, the effectiveness level of SN #1030 was 94.4 percent, hence the acceptance test was passed.

  3. SLURRY MIX EVAPORATOR BATCH ACCEPTABILITY AND TEST CASES OF THE PRODUCT COMPOSITION CONTROL SYSTEM WITH THORIUM AS A REPORTABLE ELEMENT

    SciTech Connect

    Edwards, T.

    2010-10-07

    requested to conduct. SRNL issued a Task Technical and Quality Assurance (TT&QA) plan [4] in response to the SRR request. The conclusions provided in this report are that no changes need to be made to the SME acceptability process (i.e., no modifications to WSRC-TR-95-00364, Revision 5, are needed) and no changes need to be made to the Product Composition Control System (PCCS) itself (i.e. the spreadsheet utilized by Waste Solidification Engineering (WSE) for acceptability decisions does not require modification) in response to thorium becoming a reportable element for DWPF operations. In addition, the inputs and results for the two test cases requested by WSE for use in confirming the successful activation of thorium as a reportable element for DWPF operations during the processing of SB6 are presented in this report.

  4. Test Plan for the Bearing Dust Cycle Test

    NASA Technical Reports Server (NTRS)

    Gunderson, Katelyn; Aitchison, Lindsay

    2014-01-01

    The overall objective of these experiments is to test the dust-resistant seal on the high performance glove disconnect system (HPGD), to analyze the response of the bearing to lunar regolith simulant effects.

  5. SuperTools Test and Evaluation Plan

    SciTech Connect

    Mannos, Tom J.

    2017-01-01

    Superconducting electronics (SCE) represents a potential path to efficient exascale computing for HPC and data center applications, but SCE-based circuit design lags far behind its CMOS equivalent. IARPA’s ongoing C3 program and its developing SuperTools program aim to jumpstart SCE R&D with the near-term goal of producing a high-speed, low-energy, 64-bit RISC processor using Josephson Junction based logic cells. SuperTools performers will develop software tools for efficient SCE design and accurate simulation and characterization of JJ-based circuits, which include the RSFQ, RQL, and AQFP logic families. T&E teams from NIST, MIT Lincoln Lab, Berkeley Lab, and Sandia National Labs will evaluate the tools and fabricate test circuits to compare with simulated results. The five-year, three-phase program includes 48 performer deliverables, three annual technical exchange meetings, and annual site visits.

  6. Treatability Test Plan for an In Situ Biostimulation Reducing Barrier

    SciTech Connect

    Truex, Michael J.; Vermeul, Vince R.; Long, Philip E.; Brockman, Fred J.; Oostrom, Mart; Hubbard, Susan; Borden, Robert C.; Fruchter, Jonathan S.

    2007-10-26

    This treatability test plan supports a new, integrated strategy to accelerate cleanup of chromium in the 100 Areas at the Hanford Site. This plan includes performing a field-scale treatability test for bioreduction of chromate, nitrate, and dissolved oxygen. In addition to remediating a portion of the plume and demonstrating reduction of electron acceptors in the plume, the data from this test will be valuable for designing a full-scale bioremediation system to apply at this and other chromium plumes at the Hanford Site.

  7. EBMUD Drought Planning Put to the Test in 2014

    NASA Astrophysics Data System (ADS)

    Bray, B. S.

    2014-12-01

    The East Bay Municipal Utility District faced challenges in the unprecedented 2014 drought managing limited supplies to reliably serve its customers. The District's successful drought planning required a multi-faceted plan to preserve a reliable water supply, now and into the future. Planning has included investments in recycled water projects, passive and active customer conservation programs, and pursuit of alternative water supply options. EBMUD's drought planning efforts have been tested in 2014 when California experienced one of the driest years on record and the 2nd driest year in the Mokelumne Watershed, the source of 90% of the District's water supply. This presentation will highlight the effectiveness of drought planning in three areas: (1) implementing 10% water conservation as of July 2014, (2) the securing of nearly 20TAF of supplemental water supply conveyed through the Freeport Regional Water Project, and (3) operating EBMUD's Mokelumne River Project to meet fishery flow and water quality objectives.

  8. Test plan for hydrologic modeling of protective barriers

    SciTech Connect

    Fayer, M.J.

    1990-03-01

    Pacific Northwest Laboratory prepared this test plan for the Model Applications and Validation Task of the Hanford Protective Barriers Program, which is managed by Westinghouse Hanford Company. The objectives of this plan are to outline the conceptual hydrologic model of protective barriers, discuss the available computer codes, describe the interrelationships between the modeling task and the other tasks of the Protective Barriers Program, present the barrier modeling tests, and estimate the schedule and costs of the hydrologic modeling task for planning purposes by the Protective Barriers Program. The purpose of the tests is to validate models that will be used to confirm the long-term performance of the barrier in minimizing drainage. A second purpose of the tests is to provide information to other parts of the Protective Barriers Program that require such information. 26 refs., 2 figs., 3 tabs.

  9. Underground Test Area Subproject Project Management Plan, Revision 1

    SciTech Connect

    1998-06-03

    This Project Management Plan (PMP) describes the manner in which the US Department of Energy Nevada Operations Office (DOE/NV) will manage the Underground Test Area (UGTA) Subproject at the Nevada Test Site (NTS). It provides the basic guidance for implementation and the organizational structure for meeting the UGTA objectives.

  10. Experimental Test Plan DOE Tidal and River Reference Turbines

    SciTech Connect

    Neary, Vincent S; Hill, Craig; Chamorro, Leonardo; Gunawan, Budi

    2012-09-01

    Our aim is to provide details of the experimental test plan for scaled model studies in St. Anthony Falls Laboratory (SAFL) Main Channel at the University of Minnesota, including a review of study objectives, descriptions of the turbine models, the experimental set-up, instrumentation details, instrument measurement uncertainty, anticipated experimental test cases, post-processing methods, and data archiving for model developers.

  11. Flammable gas interlock spoolpiece flow response test plan and procedure

    SciTech Connect

    Schneider, T.C., Fluor Daniel Hanford

    1997-02-13

    The purpose of this test plan and procedure is to test the Whittaker electrochemical cell and the Sierra Monitor Corp. flammable gas monitors in a simulated field flow configuration. The sensors are used on the Rotary Mode Core Sampling (RMCS) Flammable Gas Interlock (FGI), to detect flammable gases, including hydrogen and teminate the core sampling activity at a predetermined concentration level.

  12. Test plan for air monitoring during the Cryogenic Retrieval Demonstration

    SciTech Connect

    Yokuda, E.

    1992-06-01

    This report presents a test plan for air monitoring during the Cryogenic Retrieval Demonstration (CRD). Air monitors will be used to sample for the tracer elements neodymium, terbium, and ytterbium, and dysprosium. The results from this air monitoring will be used to determine if the CRD is successful in controlling dust and minimizing contamination. Procedures and equipment specifications for the test are included.

  13. Mixer pump test plan for double shell tank AZ-101

    SciTech Connect

    STAEHR, T.W.

    1999-05-12

    Mixer pump systems have been chosen as the method for retrieval of tank wastes contained in double shell tanks at Hanford. This document describes the plan for testing and demonstrating the ability of two 300 hp mixer pumps to mobilize waste in tank AZ-101. The mixer pumps, equipment and instrumentation to monitor the test were installed by Project W-151.

  14. 40 CFR 600.009-85 - Hearing on acceptance of test data.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) ENERGY POLICY FUEL ECONOMY AND CARBON-RELATED EXHAUST EMISSIONS OF MOTOR VEHICLES Fuel Economy Regulations for 1977 and Later Model Year Automobiles-General Provisions § 600.009-85 Hearing on acceptance...

  15. W-026 acceptance test report plant control system software(submittal {number_sign}223.02)

    SciTech Connect

    Watson, T.L.

    1997-02-14

    Acceptance Testing of the WRAP 1 Plant Control System software was conducted throughout the construction of WRAP 1 with final testing on the glovebox software being completed in December 1996. The software tests were broken out into five sections; one for each of the four Local Control Units and one for the supervisory software modules. This document contains a completed copy of the software tests along with the applicable test log and completed Exception Test Reports. The ETRs outside the scope of the contractor are not signed off. These will be resolved by the Buyer and all 1280 open issues will be tracked on Buyer`s ETR database pending resolution.

  16. Open test assembly (OTA) shear demonstration testing work/test plan

    SciTech Connect

    Hiller, S.W.

    1998-07-16

    This document describes the development testing phase associated with the OTA Shear activity and defines the controls to be in place throughout the testing. The purpose of the OTA Shear Program was to provide equipment that is needed for the processing of 40 foot long, sodium wetted, irradiated core components previously used in the FFTF reactor to monitor fuel and materials tests. There are currently 15 of these OTA test stalks located in the Test Assembly Conditioning Station (TACS) inerted vault. These need to be dispositioned for a shutdown mission to eliminate this highly activated, high dose inventory prior to turnover to the ERC since they must be handled by remote operations. These would also need to be dispositioned for a restart mission to free up the vault they currently reside in. The waste handling and cleaning equipment in the J33M Cell was designed and built for the handling of reactor components up to the standard 12 foot length. This program will provide the equipment to the IEM Cell to remotely section the OTAS into pieces less than 12 feet in length to allow for the necessary handling and cleaning operations required for proper disposition. Due to the complexity of all operations associated with remote handling, the availability of the IEM Cell training facility, and the major difficulty with reworking contaminated equipment, it was determined that preliminary testing of the equipment was desirable, This testing activity would provide the added assurance that the equipment will operate as designed prior to performance of the formal Acceptance Test Procedure (ATP) at the IEM Cell, This testing activity will also allow for some operator familiarity and procedure checkout prior to actual installation into the IEM Cell. This development testing will therefore be performed at the conclusion of equipment fabrication and prior to transfer of the equipment to the 400 Area.

  17. Getting it right. Planning and pre-testing.

    PubMed

    1998-01-01

    Although a range of formats is available for communicating health education messages, materials development should always involve the following steps: planning, researching and writing, producing illustrations or photographs, designing, pretesting, production and printing, distribution, and feedback from the target audience. Careful planning requires attention to issues such as the existing knowledge and literacy level of the intended audience, goals, local factors that may affect how the message is understood, distribution strategies, and necessary staff and skills. Pretesting is important before materials are produced in final form to ensure they attract attention, are correctly understood, and are culturally acceptable. The number of pretest participants depends on how soon a consistent response emerges. In general, at least three-quarters of those involved in pretesting should understand and like the materials before they are used.

  18. Acceptability of Using Electronic Vending Machines to Deliver Oral Rapid HIV Self-Testing Kits: A Qualitative Study

    PubMed Central

    Young, Sean D.; Daniels, Joseph; Chiu, ChingChe J.; Bolan, Robert K.; Flynn, Risa P.; Kwok, Justin; Klausner, Jeffrey D.

    2014-01-01

    Introduction Rates of unrecognized HIV infection are significantly higher among Latino and Black men who have sex with men (MSM). Policy makers have proposed that HIV self-testing kits and new methods for delivering self-testing could improve testing uptake among minority MSM. This study sought to conduct qualitative assessments with MSM of color to determine the acceptability of using electronic vending machines to dispense HIV self-testing kits. Materials and Methods African American and Latino MSM were recruited using a participant pool from an existing HIV prevention trial on Facebook. If participants expressed interest in using a vending machine to receive an HIV self-testing kit, they were emailed a 4-digit personal identification number (PIN) code to retrieve the test from the machine. We followed up with those who had tested to assess their willingness to participate in an interview about their experience. Results Twelve kits were dispensed and 8 interviews were conducted. In general, participants expressed that the vending machine was an acceptable HIV test delivery method due to its novelty and convenience. Discussion Acceptability of this delivery model for HIV testing kits was closely associated with three main factors: credibility, confidentiality, and convenience. Future research is needed to address issues, such as user-induced errors and costs, before scaling up the dispensing method. PMID:25076208

  19. Overview of environmental test plans for Space Station Freedom work package 4

    NASA Technical Reports Server (NTRS)

    Peterson, Tom J.

    1992-01-01

    The generation and distribution of electric power for Space Station Freedom (SSF) is critical to the station's success. Work Package 4 (WP-04) has the responsibility for the design, development, test, and delivery of the Electric Power System (EPS) for the SSF. During launch, assembly, and operation, the EPS will be subjected to various environments. A test and verification approach has been developed to assure that the EPS will function in these environments. An overview of that test program is presented with emphasis on environmental testing of hardware. Two key areas of the test program are highlighted in the overview. One area is the verification of the Solar Power Module (SPM) and associated cargo element hardware. This area includes detailing the plans for development and qualification testing of the SPM hardware. One series of tests, including modal and acoustic, has been completed on a development cargo element. Another area highlighted is the acceptance testing of high-power Orbital Replacement Units (ORU). The environmental test equipment plans are presented and reviewed in light of an aggressive production rate, which delivers ORU's to the WP-04 and other Space Station Work Packages. Through implementing the test program as outlined, the EPS hardware will be certified for flight and operation on the Space Station Freedom.

  20. W-026, acceptance test report box non-destructive examination system (submittal {number_sign}046.2) 5368

    SciTech Connect

    Watson, T.L.

    1997-01-07

    The Waste Receiving and Processing Facility, Module 1 (WRAP 1) Box Non- Destructive Examination (NDE) System is designed to use x-ray technology to safely examine boxes containing radioactive and mixed waste. It is designed to meet the requirements of the Code of Federal Regulations, the Washington Administrative Code, and the American National Standards Institute. This Acceptance Test Procedure (ATP) has been prepared to demonstrate that the WRAP- 1 Box NDE System will function as intended by the Integrated Construction Forces Kaiser Engineers Hanford Company (ICF KH) procurement requisition KEH- 5368. This document is prepared in compliance with Section 13533 and Appendix A of the W-026 Construction Specification. The test results will be issued as an Acceptance Test Report (ATR) after all testing is complete. The test will be performed in WRAP 1.

  1. Acceptance Testing of a Satellite SCADA Photovoltaic-Diesel Hybrid System

    NASA Technical Reports Server (NTRS)

    Kalu, Alex; Acosta, R.; Durand, S.; Emrich, Carol; Ventre, G.; Wilson, W.

    1999-01-01

    Savannah State University (SSU) and the Florida Solar Energy Center (FSEC) have been participating in the NASA Advanced Communications Technology Satellite (ACTS) program for the last five years. This program was designed by NASA to help maintain U.S. leadership in commercial space communications by funding high-risk research, and to flight-test next-generation digital satellite components. Launched in 1993, ACTS is an U.S. government funded technology test-bed that incorporates high power Ka-band transponders, small spot beams, and on-board digital storage and switching technology. Associated with the spacecraft, is a prototype satellite control center that supports various application experiments. The SSU/FSEC application experiment is to developing a Photovoltaic-Diesel Hybrid Power system complete with satellite Supervisory Control and Data Acquisition (SCADA). The hybrid system was design to demonstrate the feasibility of using SCADA to maintain and operate remote village power systems. This configuration would enable experts at a central location to provide technical assistance to local technicians while they acquire a measure of proficiency with the hybrid system operation and maintenance. Upon full mastery of the technology, similar SCADA arrangement are planned to remotely monitor and control constellation of hybrid systems scattered overlarge rural areas. Two Orion Energy APEX-1000 hybrid systems were delivered in 1998, one was installed at SSU in eastern Georgia and the other was installed at FSEC in Central Florida. The project was designed to: (1) evaluate the performance of ACTS in a SCADA arrangement, (2) monitor the health and performance of all major hybrid subsystems, (3) investigate load control and battery charging strategies to maximize battery capacity and lifetime, and (4) develop satellite communication protocol. Preliminary results indicate that the hybrid design is suitable for satellite Supervisory Control and Data Acquisition. A

  2. 9. "TEST STAND; STRUCTURAL; CABLE TUNNEL, PLAN, SECTIONS, DETAILS." Specifications ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. "TEST STAND; STRUCTURAL; CABLE TUNNEL, PLAN, SECTIONS, DETAILS." Specifications No. OC1-55-72-(Rev.); Drawing No. 60-09-12; sheet 43 of 148; file no. AF 1320/94, Rev. A. Stamped: RECORD DRAWING - AS CONSTRUCTED. Below stamp: Contract no. 4338, no change. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Test Stand 1-A Terminal Room, Test Area 1-120, north end of Jupiter Boulevard, Boron, Kern County, CA

  3. 8. "TEST STAND, ARCHITECTURAL, FLOOR PLANS AND SCHEDULES." Specifications No. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. "TEST STAND, ARCHITECTURAL, FLOOR PLANS AND SCHEDULES." Specifications No. ENG-04-353-55-72; Drawing No. 60-0912; sheet 22 of 148; file no. 1320/73. Stamped: RECORD DRAWING - AS CONSTRUCTED. Below stamp: Contract no. 4338, no change. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Test Stand 1-A Terminal Room, Test Area 1-120, north end of Jupiter Boulevard, Boron, Kern County, CA

  4. Six-Degree-of-Freedom Dynamic Test System (SDTS) User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Stokes, LeBarian

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the SDTS. The User Test Planning Guide aids in establishing expectations for both NASA and non- NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  5. Closure Plan for the Area 5 Radioactive Waste Management Site at the Nevada Test Site

    SciTech Connect

    NSTec Environmental Management

    2008-09-01

    The Area 5 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the preliminary closure plan for the Area 5 RWMS at the NTS that was presented in the Integrated Closure and Monitoring Plan (DOE, 2005a). The major updates to the plan include a new closure schedule, updated closure inventory, updated site and facility characterization data, the Title II engineering cover design, and the closure process for the 92-Acre Area of the RWMS. The format and content of this site-specific plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). This interim closure plan meets closure and post-closure monitoring requirements of the order DOE O 435.1, manual DOE M 435.1-1, Title 40 Code of Federal Regulations (CFR) Part 191, 40 CFR 265, Nevada Administrative Code (NAC) 444.743, and Resource Conservation and Recovery Act (RCRA) requirements as incorporated into NAC 444.8632. The Area 5 RWMS accepts primarily packaged low-level waste (LLW), low-level mixed waste (LLMW), and asbestiform low-level waste (ALLW) for disposal in excavated disposal cells.

  6. A Randomized Controlled Trial of Acceptance-Based Behavior Therapy and Cognitive Therapy for Test Anxiety: A Pilot Study

    ERIC Educational Resources Information Center

    Brown, Lily A.; Forman, Evan M.; Herbert, James D.; Hoffman, Kimberly L.; Yuen, Erica K.; Goetter, Elizabeth M.

    2011-01-01

    Many university students suffer from test anxiety that is severe enough to impair performance. Given mixed efficacy results of previous cognitive-behavior therapy (CBT) trials and a theoretically driven rationale, an acceptance-based behavior therapy (ABBT) approach was compared to traditional CBT (i.e., Beckian cognitive therapy; CT) for the…

  7. Examining the Intention to Use Technology among Pre-Service Teachers: An Integration of the Technology Acceptance Model and Theory of Planned Behavior

    ERIC Educational Resources Information Center

    Teo, Timothy

    2012-01-01

    This study examined pre-service teachers' self-reported intention to use technology. One hundred fifty-seven participants completed a survey questionnaire measuring their responses to six constructs from a research model that integrated the Technology Acceptance Model (TAM) and Theory of Planned Behavior (TPB). Structural equation modeling was…

  8. Short Lesson Plan Associated with Increased Acceptance of Evolutionary Theory and Potential Change in Three Alternate Conceptions of Macroevolution in Undergraduate Students

    ERIC Educational Resources Information Center

    Abraham, Joel K.; Perez, Kathryn E.; Downey, Nicholas; Herron, Jon C.; Meir, Eli

    2012-01-01

    Undergraduates commonly harbor alternate conceptions about evolutionary biology; these alternate conceptions often persist, even after intensive instruction, and may influence acceptance of evolution. We interviewed undergraduates to explore their alternate conceptions about macroevolutionary patterns and designed a 2-h lesson plan to present…

  9. A Public Dissemination Plan of Test Results and Application of Testing to Improvement of Instruction.

    ERIC Educational Resources Information Center

    Robinson, Carol; O'Neal, Sandra

    To combat negative press reports concerning schools and test scores, the Albuquerque Public Schools (APS) Public Information Office (PIO) and the Department of Instructional Research, Testing, and Evaluation (IRTE) developed a dissemination plan geared toward informing the public about testing. Designed to include both test scores and information…

  10. 40 CFR 86.1830-01 - Acceptance of vehicles for emission testing.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... vehicles for emission testing. (a) General test vehicle requirements. (1) All test vehicles shall be tested... applicable for the type of test conducted. (2) Components affecting emissions which are used to build test... good engineering judgment. (3) Test vehicles must have air conditioning installed and operational...

  11. 40 CFR 86.1830-01 - Acceptance of vehicles for emission testing.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... vehicles for emission testing. (a) General test vehicle requirements. (1) All test vehicles shall be tested... applicable for the type of test conducted. (2) Components affecting emissions which are used to build test... good engineering judgment. (3) Test vehicles must have air conditioning installed and operational...

  12. 40 CFR 86.1830-01 - Acceptance of vehicles for emission testing.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... vehicles for emission testing. (a) General test vehicle requirements. (1) All test vehicles shall be tested... applicable for the type of test conducted. (2) Components affecting emissions which are used to build test... good engineering judgment. (3) Test vehicles must have air conditioning installed and operational...

  13. 40 CFR 86.1830-01 - Acceptance of vehicles for emission testing.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... emission testing. (a) General test vehicle requirements. (1) All test vehicles shall be tested in the... type of test conducted. (2) Components affecting emissions which are used to build test vehicles shall... judgment. (3) Test vehicles must have air conditioning installed and operational if that configuration...

  14. 40 CFR 86.1830-01 - Acceptance of vehicles for emission testing.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... vehicles for emission testing. (a) General test vehicle requirements. (1) All test vehicles shall be tested... applicable for the type of test conducted. (2) Components affecting emissions which are used to build test... good engineering judgment. (3) Test vehicles must have air conditioning installed and operational...

  15. Acceptability and Feasibility of HIV Self-Testing Among Transgender Women in San Francisco: A Mixed Methods Pilot Study

    PubMed Central

    Moran, Lissa; Sevelius, Jae; Castillo, Leslie S.; Ventura, Angel; Treves-Kagan, Sarah; Buchbinder, Susan

    2015-01-01

    An estimated one in four transgender women (trans women) in the U.S. are infected with HIV. Rates of HIV testing are not commensurate with their risk, necessitating alternative strategies for early detection and care. We explored the feasibility and acceptability of HIV self-testing (HIVST) with 50 HIV-negative adult trans women in San Francisco. Participants received three self-test kits to perform once a month. Acceptability and behavioral surveys were collected as were 11 in-depth interviews (IDIs). Among 50 participants, 44 reported utilizing HIVST at least once; 94 % reported the test easy to use; 93 % said results were easy to read; and 91 % would recommend it to others. Most participants (68 %) preferred HIVST to clinic-based testing, although price was a key barrier to uptake. IDIs revealed a tension between desires for privacy versus support found at testing sites. HIVST for trans women was acceptable and feasible and requires careful consideration of linkage to support services. PMID:26511864

  16. 42 CFR 484.18 - Condition of participation: Acceptance of patients, plan of care, and medical supervision.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... a doctor of medicine, osteopathy, or podiatric medicine. (a) Standard: Plan of care. The plan of... potential, functional limitations, activities permitted, nutritional requirements, medications...

  17. 42 CFR 484.18 - Condition of participation: Acceptance of patients, plan of care, and medical supervision.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... a doctor of medicine, osteopathy, or podiatric medicine. (a) Standard: Plan of care. The plan of... potential, functional limitations, activities permitted, nutritional requirements, medications...

  18. 42 CFR 484.18 - Condition of participation: Acceptance of patients, plan of care, and medical supervision.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... a doctor of medicine, osteopathy, or podiatric medicine. (a) Standard: Plan of care. The plan of... potential, functional limitations, activities permitted, nutritional requirements, medications...

  19. 42 CFR 484.18 - Condition of participation: Acceptance of patients, plan of care, and medical supervision.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... a doctor of medicine, osteopathy, or podiatric medicine. (a) Standard: Plan of care. The plan of... potential, functional limitations, activities permitted, nutritional requirements, medications...

  20. 42 CFR 484.18 - Condition of participation: Acceptance of patients, plan of care, and medical supervision.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... a doctor of medicine, osteopathy, or podiatric medicine. (a) Standard: Plan of care. The plan of... potential, functional limitations, activities permitted, nutritional requirements, medications...

  1. TEST REACTOR AREA PLOT PLAN CA. 1968. MTR AND ETR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    TEST REACTOR AREA PLOT PLAN CA. 1968. MTR AND ETR AREAS SOUTH OF PERCH AVENUE. "COLD" SERVICES NORTH OF PERCH. ADVANCED TEST REACTOR IN NEW SECTION WEST OF COLD SERVICES SECTION. NEW PERIMETER FENCE ENCLOSES BETA RAY SPECTROMETER, TRA-669, AN ATR SUPPORT FACILITY, AND ATR STACK. UTM LOCATORS HAVE BEEN DELETED. IDAHO NUCLEAR CORPORATION, FROM A BLAW-KNOX DRAWING, 3/1968. INL INDEX NO. 530-0100-00-400-011646, REV. 0. - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID

  2. 14 CFR 437.25 - Flight test plan.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 4 2014-01-01 2014-01-01 false Flight test plan. 437.25 Section 437.25 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF... reusable suborbital rocket. Operational Safety Documentation...

  3. 14 CFR 437.25 - Flight test plan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false Flight test plan. 437.25 Section 437.25 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF... reusable suborbital rocket. Operational Safety Documentation...

  4. 14 CFR 437.25 - Flight test plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Flight test plan. 437.25 Section 437.25 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF... reusable suborbital rocket. Operational Safety Documentation...

  5. 14 CFR 437.25 - Flight test plan.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 4 2012-01-01 2012-01-01 false Flight test plan. 437.25 Section 437.25 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF... reusable suborbital rocket. Operational Safety Documentation...

  6. 14 CFR 437.25 - Flight test plan.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 4 2013-01-01 2013-01-01 false Flight test plan. 437.25 Section 437.25 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF... reusable suborbital rocket. Operational Safety Documentation...

  7. Orbit attitude processor. STS-1 bench program verification test plan

    NASA Technical Reports Server (NTRS)

    Mcclain, C. R.

    1980-01-01

    A plan for the static verification of the STS-1 ATT PROC ORBIT software requirements is presented. The orbit version of the SAPIENS bench program is used to generate the verification data. A brief discussion of the simulation software and flight software modules is presented along with a description of the test cases.

  8. General test plan redundant sensor strapdown IMU evaluation program

    NASA Technical Reports Server (NTRS)

    Hartwell, T.; Irwin, H. A.; Miyatake, Y.; Wedekind, D. E.

    1971-01-01

    The general test plan for a redundant sensor strapdown inertial measuring unit evaluation program is presented. The inertial unit contains six gyros and three orthogonal accelerometers. The software incorporates failure detection and correction logic and a land vehicle navigation program. The principal objective of the test is a demonstration of the practicability, reliability, and performance of the inertial measuring unit with failure detection and correction in operational environments.

  9. Gearbox Reliability Collaborative Phase 3 Gearbox 3 Test Plan

    SciTech Connect

    Keller, Jonathan; Wallen, Robb

    2016-10-01

    This document describes the Phase 3 test plan for the Gearbox Reliability Collaborative Gearbox #3. The primary test objective is to measure the planetary load sharing characteristics in the same conditions as the original gearbox design. If the measured load-sharing characteristics are close to the design model, the projected three-times improvement in planetary section predicted fatigue life and the efficacy of preloaded tapered roller bearings in mitigating the planetary bearing fatigue failure mode will have been demonstrated.

  10. The Single Sample Chi-Square Test: Lesson Plan.

    ERIC Educational Resources Information Center

    Yang, Shouu-Chyuan

    This lesson plan is designed to enable a student, after 50 minutes of instruction, to define the single sample chi-square test and explain the three conditions necessary to its proper use and the purpose of using it. The student will also be able to calculate and apply the single sample chi-square test in class according to the five steps with the…

  11. Robust Design of Reliability Test Plans Using Degradation Measures.

    SciTech Connect

    Lane, Jonathan Wesley; Lane, Jonathan Wesley; Crowder, Stephen V.; Crowder, Stephen V.

    2014-10-01

    With short production development times, there is an increased need to demonstrate product reliability relatively quickly with minimal testing. In such cases there may be few if any observed failures. Thus, it may be difficult to assess reliability using the traditional reliability test plans that measure only time (or cycles) to failure. For many components, degradation measures will contain important information about performance and reliability. These measures can be used to design a minimal test plan, in terms of number of units placed on test and duration of the test, necessary to demonstrate a reliability goal. Generally, the assumption is made that the error associated with a degradation measure follows a known distribution, usually normal, although in practice cases may arise where that assumption is not valid. In this paper, we examine such degradation measures, both simulated and real, and present non-parametric methods to demonstrate reliability and to develop reliability test plans for the future production of components with this form of degradation.

  12. Solar Dynamics Observatory On-Orbit Jitter Testing, Analysis, and Mitigation Plans

    NASA Technical Reports Server (NTRS)

    Liu, Kuo-Chia (Alice); Blaurock, Carl A.; Bourkland, Kristin L.; Morgenstern, Wendy M.; Maghami, Peiman G.

    2011-01-01

    -orbit jitter tests were designed to satisfy the following four objectives: 1. Determine the acceptable reaction wheel operational speed range during Science Mode. 2. Determine HGA algorithm jitter parameters (number of stagger steps and enable/disable no-steprequests). 3. Determine acceptable EVE instrument filter wheels spin rates. 4. Determine if AIA instrument filter wheels excite the first AIA telescope structural mode. This paper provides detailed information on the SDO wheel jitter test plan, shows on-orbit jitter measurements and how ground predictions compare to those measurements, and describes the final jitter mitigation plan executed on SDO.

  13. Questionnaire design: carry-over effects of overall acceptance question placement and pre-evaluation instructions on overall acceptance scores in central location tests.

    PubMed

    Bastian, Mauresa; Eggett, Dennis L; Jefferies, Laura K

    2015-02-01

    Question placement and usage of pre-evaluation instructions (PEI) in questionnaires for food sensory analysis may bias consumers' scores via carry-over effects. Data from consumer sensory panels previously conducted at a central location, spanning 11 years and covering a broad range of food product categories, were compiled. Overall acceptance (OA) question placement was studied with categories designated as first (the first evaluation question following demographic questions), after nongustation questions (immediately following questions that do not require panelists to taste the product), and later (following all other hedonic and just-about-right [JAR] questions, but occasionally before ranking, open-ended comments, and/or intent to purchase questions). Each panel was categorized as having or not having PEI in the questionnaire; PEI are instructions that appear immediately before the first evaluation question and show panelists all attributes they will evaluate before receiving test samples. Postpanel surveys were administered regarding the self-reported effect of PEI on panelists' evaluation experience. OA scores were analyzed and compared (1) between OA question placement categories and (2) between panels with and without PEI. For most product categories, OA scores tended to be lower when asked later in the questionnaire, suggesting evidence of a carry-over effect. Usage of PEI increased OA scores by 0.10 of a 9-point hedonic scale point, which is not practically significant. Postpanel survey data showed that presence of PEI typically improved the panelists' experience. Using PEI does not appear to introduce a meaningful carry-over effect.

  14. Short Lesson Plan Associated with Increased Acceptance of Evolutionary Theory and Potential Change in Three Alternate Conceptions of Macroevolution in Undergraduate Students

    PubMed Central

    Abraham, Joel K.; Perez, Kathryn E.; Downey, Nicholas; Herron, Jon C.; Meir, Eli

    2012-01-01

    Undergraduates commonly harbor alternate conceptions about evolutionary biology; these alternate conceptions often persist, even after intensive instruction, and may influence acceptance of evolution. We interviewed undergraduates to explore their alternate conceptions about macroevolutionary patterns and designed a 2-h lesson plan to present evidence that life has evolved. We identified three alternate conceptions during our interviews: that newly derived traits would be more widespread in extant species than would be ancestral traits, that evolution proceeds solely by anagenesis, and that lineages must become more complex over time. We also attempted to measure changes in the alternate conceptions and levels of acceptance of evolutionary theory in biology majors and nonmajors after exposure to the lesson plan. The instrument used to assess understanding had flaws, but our results are suggestive of mixed effects: we found a reduction in the first alternate conception, no change in the second, and reinforcement of the third. We found a small, but significant, increase in undergraduate acceptance of evolutionary theory in two trials of the lesson plan (Cohen's d effect sizes of 0.51 and 0.19). These mixed results offer guidance on how to improve the lesson and show the potential of instructional approaches for influencing acceptance of evolution. PMID:22665588

  15. Short lesson plan associated with increased acceptance of evolutionary theory and potential change in three alternate conceptions of macroevolution in undergraduate students.

    PubMed

    Abraham, Joel K; Perez, Kathryn E; Downey, Nicholas; Herron, Jon C; Meir, Eli

    2012-01-01

    Undergraduates commonly harbor alternate conceptions about evolutionary biology; these alternate conceptions often persist, even after intensive instruction, and may influence acceptance of evolution. We interviewed undergraduates to explore their alternate conceptions about macroevolutionary patterns and designed a 2-h lesson plan to present evidence that life has evolved. We identified three alternate conceptions during our interviews: that newly derived traits would be more widespread in extant species than would be ancestral traits, that evolution proceeds solely by anagenesis, and that lineages must become more complex over time. We also attempted to measure changes in the alternate conceptions and levels of acceptance of evolutionary theory in biology majors and nonmajors after exposure to the lesson plan. The instrument used to assess understanding had flaws, but our results are suggestive of mixed effects: we found a reduction in the first alternate conception, no change in the second, and reinforcement of the third. We found a small, but significant, increase in undergraduate acceptance of evolutionary theory in two trials of the lesson plan (Cohen's d effect sizes of 0.51 and 0.19). These mixed results offer guidance on how to improve the lesson and show the potential of instructional approaches for influencing acceptance of evolution.

  16. Are women more likely to self-test? A short report from an acceptability study of the HIV self-testing kit in South Africa.

    PubMed

    Spyrelis, Alexandra; Abdulla, Saira; Frade, Sasha; Meyer, Tessa; Mhazo, Miriam; Taruberekera, Noah; Taljaard, Dirk; Billy, Scott

    2017-03-01

    This study assessed the acceptability of, as well as the facilitators of and barriers to the HIV self-testing kit in the Gauteng province, South Africa. An exploratory qualitative cross-sectional study was conducted using focus group discussions (FGDs) among a sample of 118 respondents selected from the Braamfontein and Soweto areas of Johannesburg. Sixteen FGDs were conducted in order to assess the acceptability of the HIV self-testing kit. Respondent groups were segmented according to area (Soweto or Braamfontein), gender (male or female), age (20-34 and 35-49 years of age) and HIV testing status (have previously tested for HIV or have never tested for HIV) in order to achieve maximum variability. The main advantage identified was that the self-testing kit allows for privacy and confidentiality with regard to HIV status, and does not require a visit to a health facility - two of the main barriers to current HIV counselling and testing uptake. However, respondents, predominantly males, were concerned about the lack of counselling involved, which they thought could lead to suicide ideation among testers. The HIV self-testing kit was found to be acceptable among the majority of respondents. However, there is still a need for follow-up services for self-testers. The idea of a hotline for telephonic counselling within the self-testing model seemed to be favourable among many respondents and is an alternative to traditional face-to-face counselling, although some respondents felt that this was not sufficient.

  17. Definition study for an extended manned test of a regenerative life support system, preliminary test plan

    NASA Technical Reports Server (NTRS)

    1971-01-01

    A preliminary plan and procedure are presented for conducting an extended manned test program for a regenerative life support system. Emphasis will be placed on elements associated with long-term system operation and long-term uninterrupted crew confinement.

  18. Test Plan: Sludge Treatment Project Corrosion Process Chemistry Follow-on Testing

    SciTech Connect

    Delegard, Calvin H.; Schmidt, Andrew J.; Poloski, Adam P.

    2007-08-17

    This test plan was prepared by the Pacific Northwest National Laboratory (PNNL) under contract with Fluor Hanford (FH). The test plan describes the scope and conditions to be used to perform laboratory-scale testing of the Sludge Treatment Project (STP) hydrothermal treatment of K Basin sludge. The STP, managed for the U. S. Department of Energy (DOE) by FH, was created to design and operate a process to eliminate uranium metal from the sludge prior to packaging for Waste Isolation Pilot Plant (WIPP) by using high temperature liquid water to accelerate the reaction, produce uranium dioxide from the uranium metal, and safely discharge the hydrogen. The proposed testing builds on the approach and laboratory test findings for both K Basin sludge and simulated sludge garnered during prior testing from September 2006 to March 2007. The outlined testing in this plan is designed to yield further understanding of the nature of the chemical reactions, the effects of compositional and process variations and the effectiveness of various strategies to mitigate the observed high shear strength phenomenon observed during the prior testing. These tests are designed to provide process validation and refinement vs. process development and design input. The expected outcome is to establish a level of understanding of the chemistry such that successful operating strategies and parameters can be implemented within the confines of the existing STP corrosion vessel design. In July 2007, the DOE provided direction to FH regarding significant changes to the scope of the overall STP. As a result of the changes, FH directed PNNL to stop work on most of the planned activities covered in this test plan. Therefore, it is unlikely the testing described here will be performed. However, to preserve the test strategy and details developed to date, the test plan has been published.

  19. Top Down Implementation Plan for system performance test software

    NASA Technical Reports Server (NTRS)

    Jacobson, G. N.; Spinak, A.

    1982-01-01

    The top down implementation plan used for the development of system performance test software during the Mark IV-A era is described. The plan is based upon the identification of the hierarchical relationship of the individual elements of the software design, the development of a sequence of functionally oriented demonstrable steps, the allocation of subroutines to the specific step where they are first required, and objective status reporting. The results are: determination of milestones, improved managerial visibility, better project control, and a successful software development.

  20. Test Plan: Phase 1, Hanford LLW melter tests, GTS Duratek, Inc.

    SciTech Connect

    Eaton, W.C.

    1995-06-14

    This document provides a test plan for the conduct of vitrification testing by a vendor in support of the Hanford Tank Waste Remediation System (TWRS) Low-Level Waste (LLW) Vitrification Program. The vendor providing this test plan and conducting the work detailed within it [one of seven selected for glass melter testing under Purchase Order MMI-SVV-384215] is GTS Duratek, Inc., Columbia, Maryland. The GTS Duratek project manager for this work is J. Ruller. This test plan is for Phase I activities described in the above Purchase Order. Test conduct includes melting of glass with Hanford LLW Double-Shell Slurry Feed waste simulant in a DuraMelter{trademark} vitrification system.

  1. International Space Station Environmental Control and Life Support System Acceptance Testing for Node 1 Temperature and Humidity Control Subsystem

    NASA Technical Reports Server (NTRS)

    Williams, David E.

    2011-01-01

    The International Space Station (ISS) Node 1 Environmental Control and Life Support (ECLS) System is comprised of five subsystems: Atmosphere Control and Storage (ACS), Atmosphere Revitalization (AR), Fire Detection and Suppression (FDS), Temperature and Humidity Control (THC), and Water Recovery and Management (WRM). This paper will provide a summary of the Node 1 ECLS THC subsystem design and a detailed discussion of the ISS ECLS Acceptance Testing methodology utilized for this subsystem.The International Space Station (ISS) Node 1 Environmental Control and Life Support (ECLS) System is comprised of five subsystems: Atmosphere Control and Storage (ACS), Atmosphere Revitalization (AR), Fire Detection and Suppression (FDS), Temperature and Humidity Control (THC), and Water Recovery and Management (WRM). This paper will provide a summary of the Node 1 ECLS THC subsystem design and a detailed discussion of the ISS ECLS Acceptance Testing methodology utilized for this subsystem.

  2. 4. "TEST STAND NO. 13, CONCRETE STRUCTURAL PLAN AND ELEVATION." ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. "TEST STAND NO. 1-3, CONCRETE STRUCTURAL PLAN AND ELEVATION." Specifications No. OC11-50-10; Drawing No. 60-09-06; no sheet number within title block. D.O. SERIES 1109/12 REV. E. Stamped: RECORD DRAWING - AS CONSTRUCTED. Below stamp: Contract DA-04-353 Eng. 177, Rev. E; Date: 17 Dec. 1951. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Test Stand 1-3, Test Area 1-115, northwest end of Saturn Boulevard, Boron, Kern County, CA

  3. Vibration test plan for a space station heat pipe subassembly

    SciTech Connect

    Parekh, M.B.

    1987-09-29

    This test plan describes the Sundstrand portion of task two of Los Alamos National Laboratory (LANL) contract 9-x6H-8102L-1. Sundstrand Energy Systems was awarded a contract to investigate the performance capabilities of a potassium liquid metal heat pipe as applied to the Organic Rankine Cycle (ORC) solar dynamic power system for the Space Station. The test objective is to expose the heat pipe subassembly to the random vibration environment which simulates the space shuttle launch condition. The results of the test will then be used to modify as required future designs of the heat pipe.

  4. Flight Test Hazard Planning Near the Speed of Light

    NASA Technical Reports Server (NTRS)

    Henwood, Bart; Huete, Rod

    2007-01-01

    A viewgraph presentation describing flight test safety near the speed of light is shown. The topics include: 1) Concept; 2) Portal Content; 3) Activity to Date; 4) FTS Database Updatd FAA Program; 5) FAA Flight Test Risk Management; 6) CFR 14 Part 21.35 Current and proposed changes; 7) An Online Resource for Flight Test Safety Planning; 8) Data Gathering; 9) NTPS Role; 10) Example Maturation; 11) Many Varied Inputs; 12) Matured Stall Hazards; 13) Loss of Control Mitigations; 14) FAA Access; 15) NASA PBMA Website Link; 16) FAR Reference Search; 17) Record Field Search; 18) Keyword Search; and 19) Results of FAR Reference Search.

  5. An Exploration of Student Internet Use in India: The Technology Acceptance Model and the Theory of Planned Behaviour

    ERIC Educational Resources Information Center

    Fusilier, Marcelline; Durlabhji, Subhash

    2005-01-01

    Purpose: The purpose of this paper is to explore behavioral processes involved in internet technology acceptance and use with a sample in India, a developing country that can potentially benefit from greater participation in the web economy. Design/methodology/approach - User experience was incorporated into the technology acceptance model (TAM)…

  6. Test, Control and Monitor System (TCMS) operations plan

    NASA Technical Reports Server (NTRS)

    Macfarlane, C. K.; Conroy, M. P.

    1993-01-01

    The purpose is to provide a clear understanding of the Test, Control and Monitor System (TCMS) operating environment and to describe the method of operations for TCMS. TCMS is a complex and sophisticated checkout system focused on support of the Space Station Freedom Program (SSFP) and related activities. An understanding of the TCMS operating environment is provided and operational responsibilities are defined. NASA and the Payload Ground Operations Contractor (PGOC) will use it as a guide to manage the operation of the TCMS computer systems and associated networks and workstations. All TCMS operational functions are examined. Other plans and detailed operating procedures relating to an individual operational function are referenced within this plan. This plan augments existing Technical Support Management Directives (TSMD's), Standard Practices, and other management documentation which will be followed where applicable.

  7. C-018H LERF filtration test plan. Revision 1

    SciTech Connect

    Moberg, T.P.; King, C.V.

    1994-08-26

    The following outlines the plan to test the polymeric backwash filtration system at the LERF. These tests will determine if the ETF filter design is adequate. If the tests show that the design is adequate, the task will be complete. If the tests show that the technology is inadequate, it may be necessary to perform further tests to qualify other candidate filtration technologies (e.g., polymeric tubular ultrafiltration, centrifugal ultrafiltration). The criteria to determine the success or failure of the backwash filter will be based on the system`s ability to remove the bacteria and inorganic contaminants from the evaporator process condensate. The tests are designed to qualify the design basis of the filtration technology that will be used in the ETF.

  8. Hanford Tank Farms Waste Certification Flow Loop Test Plan

    SciTech Connect

    Bamberger, Judith A.; Meyer, Perry A.; Scott, Paul A.; Adkins, Harold E.; Wells, Beric E.; Blanchard, Jeremy; Denslow, Kayte M.; Greenwood, Margaret S.; Morgen, Gerald P.; Burns, Carolyn A.; Bontha, Jagannadha R.

    2010-01-01

    A future requirement of Hanford Tank Farm operations will involve transfer of wastes from double shell tanks to the Waste Treatment Plant. As the U.S. Department of Energy contractor for Tank Farm Operations, Washington River Protection Solutions anticipates the need to certify that waste transfers comply with contractual requirements. This test plan describes the approach for evaluating several instruments that have potential to detect the onset of flow stratification and critical suspension velocity. The testing will be conducted in an existing pipe loop in Pacific Northwest National Laboratory’s facility that is being modified to accommodate the testing of instruments over a range of simulated waste properties and flow conditions. The testing phases, test matrix and types of simulants needed and the range of testing conditions required to evaluate the instruments are described

  9. Test plan for performance testing of the Eaton AC-3 electric vehicle

    SciTech Connect

    Crumley, R.L.; Heiselmann, H.W.

    1985-04-01

    An alternating current (ac) propulsion system for an electric vehicle has been developed and tested by the Eaton Corporation. The test bed vehicle is a modified 1981 Mercury Lynx. The test plan has been prepared specifically for the third modification to this test bed and identified as the Eaton AC-3. The scope of the EG and G testing at INEL to be done on the Eaton AC-3 will include coastdown and dynamometer tests but will not include environmental, on-road, or track testing. Coastdown testing will be performed in accordance with SAE J-1263 (SAE Recommended Practice for Road Load Measurement and Dynamometer Simulation Using Coastdown Techniques).

  10. State-of-the-art lockhopper valve testing and development project test plan

    SciTech Connect

    Gardner, J.F.; Holtz, T.R.

    1981-04-01

    This document has been prepared to summarize the overall plan for testing candidate valves for lockhopper use in coal conversion processes. The testing effort described will establish the capability of these valves to operate reliably in current and potential coal conversion process pilot plants, demonstration size and pioneer commercial plants. Test conditions are derived from those of coal conversion processes that exist at pilot plants and are considered typical for potential demonstration plants and pioneer commercial plants. This test plan was prepared with inputs from, and in cooperation with, Morgantown Energy Technology Center personnel.

  11. Human Factors Process Task Analysis: Liquid Oxygen Pump Acceptance Test Procedure at the Advanced Technology Development Center

    NASA Technical Reports Server (NTRS)

    Diorio, Kimberly A.; Voska, Ned (Technical Monitor)

    2002-01-01

    This viewgraph presentation provides information on Human Factors Process Failure Modes and Effects Analysis (HF PFMEA). HF PFMEA includes the following 10 steps: Describe mission; Define System; Identify human-machine; List human actions; Identify potential errors; Identify factors that effect error; Determine likelihood of error; Determine potential effects of errors; Evaluate risk; Generate solutions (manage error). The presentation also describes how this analysis was applied to a liquid oxygen pump acceptance test.

  12. International Space Station Environmental Control and Life Support System Acceptance Testing for Node 1 Atmosphere Control and Supply Subsystem

    NASA Technical Reports Server (NTRS)

    Williams, David E.

    2009-01-01

    The International Space Station (ISS) Node 1 Environmental Control and Life Support (ECLS) System is comprised of five subsystems: Atmosphere Control and Supply (ACS), Atmosphere Revitalization (AR), Fire Detection and Suppression (FDS), Temperature and Humidity Control (THC), and Water Recovery and Management (WRM). This paper provides a summary of the Node 1 ECLS ACS subsystem design and a detailed discussion of the ISS ECLS Acceptance Testing methodology utilized for that subsystem.

  13. INEL test plan for evaluating waste assay systems

    SciTech Connect

    Mandler, J.W.; Becker, G.K.; Harker, Y.D.; Menkhaus, D.E.; Clements, T.L. Jr.

    1996-09-01

    A test bed is being established at the Idaho National Engineering Laboratory (INEL) Radioactive Waste Management Complex (RWMC). These tests are currently focused on mobile or portable radioassay systems. Prior to disposal of TRU waste at the Waste Isolation Pilot Plant (WIPP), radioassay measurements must meet the quality assurance objectives of the TRU Waste Characterization Quality Assurance Program Plan. This test plan provides technology holders with the opportunity to assess radioassay system performance through a three-tiered test program that consists of: (a) evaluations using non-interfering matrices, (b) surrogate drums with contents that resemble the attributes of INEL-specific waste forms, and (c) real waste tests. Qualified sources containing a known mixture and range of radionuclides will be used for the non-interfering and surrogate waste tests. The results of these tests will provide technology holders with information concerning radioassay system performance and provide the INEL with data useful for making decisions concerning alternative or improved radioassay systems that could support disposal of waste at WIPP.

  14. Sociodemographic predictors of acceptance of voluntary HIV testing among pregnant women in a large maternity hospital, Omdurman, Sudan.

    PubMed

    Idris, A K M; Elsamani, E Z; Elnasri, A E A

    2015-06-09

    This study aimed to determine the sociodemographic predictors of willingness of pregnant women in Sudan to accept HIV testing. A random sample of 500 pregnant women attending antenatal care clinics in Omdurman maternity hospital in 2010 were interviewed. Significant predictors of women's tendency to accept HIV testing were: age < 30 years (OR 3.5, 95% CI: 2.2-5.8), primigravida (OR 1.5, 95% CI: 1.0-2.3), better education level (OR 3.4, 95% CI: 1.7-6.7), owning a radio (OR 2.1, 95% CI: 1.3-3.4), in employment (OR 2.5, 95% CI: 1.2-5.0) and ≥ 2 antenatal care visits (OR 1.9, 95% CI: 1.2-2.9). Husband's age ≥ 35 years (OR 3.2, 95% CI: 2.0-5.2) and Christian faith (OR 3.8, 95% CI: 1.4-10.7) were significant variables, although with a wide margin of confidence. These predictors should be considered in strategies to increase the acceptance and use of HIV testing and counselling services.

  15. Definition study of a Variable Cycle Experimental Engine (VCEE) and associated test program and test plan

    NASA Technical Reports Server (NTRS)

    Allan, R. D.

    1978-01-01

    The Definition Study of a Variable Cycle Experimental Engine (VCEE) and Associated Test Program and Test Plan, was initiated to identify the most cost effective program for a follow-on to the AST Test Bed Program. The VCEE Study defined various subscale VCE's based on different available core engine components, and a full scale VCEE utilizing current technology. The cycles were selected, preliminary design accomplished and program plans and engineering costs developed for several program options. In addition to the VCEE program plans and options, a limited effort was applied to identifying programs that could logically be accomplished on the AST Test Bed Program VCE to extend the usefulness of this test hardware. Component programs were provided that could be accomplished prior to the start of a VCEE program.

  16. An Overview of the NASA Aeronautics Test Program Strategic Plan

    NASA Technical Reports Server (NTRS)

    Marshall, Timothy J.

    2010-01-01

    U.S. leadership in aeronautics depends on ready access to technologically advanced, efficient, and affordable aeronautics test capabilities. These systems include major wind tunnels and propulsion test facilities and flight test capabilities. The federal government owns the majority of the major aeronautics test capabilities in the United States, primarily through the National Aeronautics and Space Administration (NASA) and the Department of Defense (DoD), however an overarching strategy for management of these national assets was needed. Therefore, in Fiscal Year (FY) 2006 NASA established the Aeronautics Test Program (ATP) as a two-pronged strategic initiative to: (1) retain and invest in NASA aeronautics test capabilities considered strategically important to the agency and the nation, and (2) establish a strong, high level partnership with the DoD Test Resources Management Center (TRMC), stewards of the DoD test and evaluation infrastructure. Since then, approximately seventy percent of the ATP budget has been directed to underpin fixed and variable costs of facility operations within its portfolio and the balance towards strategic investments in its test facilities, including maintenance and capability upgrades. Also, a strong guiding coalition was established through the National Partnership for Aeronautics Testing (NPAT), with governance by the senior leadership of NASA s Aeronautics Research Mission Directorate (ARMD) and the DoD's TRMC. As part of its strategic planning, ATP has performed or participated in many studies and analyses, including assessments of major NASA and DoD aeronautics test capabilities, test facility condition evaluations and market research. The ATP strategy has also benefitted from unpublished RAND research and analysis by Ant n et al. (2009). Together, these various studies, reports and assessments serve as a foundation for a new, five year strategic plan that will guide ATP through FY 2014. Our vision for the future is a balanced

  17. Electromagnetic Interference/Compatibility (EMI/EMC) Control Test and Measurement Facility: User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Scully, Robert C.

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the EMI/EMC Test Facility. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  18. Acceptance tests and manufacturer relationships from the 20A h standard cell data

    NASA Technical Reports Server (NTRS)

    Leibecki, H. F.

    1981-01-01

    Seventeen performance tests were used to classify spacecraft batteries in four standard groups established by manufacturers. Tests included capacity delivered values, end of charge voltage values, and internal shorts. Variance ratios are listed.

  19. Fatigue strength testing employed for evaluation and acceptance of jet-engine instrumentation probes

    NASA Astrophysics Data System (ADS)

    Armentrout, E. C.

    1980-03-01

    This report outlines the fatigue type testing performed on instrumentation rakes and probes intended for use in the air flow passages of jet-engines during full-scale engine tests at Lewis Research Center. Included is a discussion of each type of test performed, the results that may be derived and means of inspection. A design and testing sequence outlines the procedures and considerations involved in the generation of suitable instrument probes.

  20. 49 CFR 180.511 - Acceptable results of inspections and tests.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... visual inspection when the inspection shows no structural defect that may cause leakage from or failure of the tank before the next inspection and test interval. (b) Structural integrity inspection and test. A tank car successfully passes the structural integrity inspection and test when it shows...

  1. 3. "TEST STAND NO. 13, EXCAVATION PLAN & SECTIONS." Specifications ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. "TEST STAND NO. 1-3, EXCAVATION PLAN & SECTIONS." Specifications No. ENG 04-353-50-10; Drawing No. 60-0906; no sheet number within title block; D.O. SERIES 1109/10. Stamped: AS BUILT. No revisions or revision dates. Last work date on this drawing "Checked by EAG, 1/31/49." Though this drawing is specific to Test Stand 1-3, it also illustrates the general methods used for excavation design and retaining wall construction at Test Stand 1-5. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Test Stand 1-3, Test Area 1-115, northwest end of Saturn Boulevard, Boron, Kern County, CA

  2. ACRV instrumentation plan for NMD HTK light gas gun tests

    SciTech Connect

    Dobie, D W

    1999-04-12

    In support of the NMD Hit-To-Kill Program for the US Army, twenty scaled tests on simulated nuclear targets are planned. The AEDC Light Gas Gun operated by Sverdrup Technology (SVT) in Tullahoma, TN will launch the scaled NMD projectile into scaled targets. The target for all the tests is a 1/4-scale version of the Attitude Controlled Re-Entry Vehicle (ACRV). The targets were designed and fabricated by Sandia National Laboratories (SNL) and Lawrence Livermore National Laboratory (LLNL). ITT Systems (ITT) is the integrating contractor for coordination of the multiple contractors involved in these tests. The targets are inert and contain no hazardous materials. The payloads have been instrumented to aid in post-test evaluation of the functional status of the postulated weapon systems. This document describes the instrumentation methods to be used on these tests.

  3. Testing the Electronic Personal Health Record Acceptance Model by Nurses for Managing Their Own Health

    PubMed Central

    Trinkoff, A.M.; Storr, C.L.; Wilson, M.L.; Gurses, A.P.

    2015-01-01

    Summary Background To our knowledge, no evidence is available on health care professionals’ use of electronic personal health records (ePHRs) for their health management. We therefore focused on nurses’ personal use of ePHRs using a modified technology acceptance model. Objectives To examine (1) the psychometric properties of the ePHR acceptance model, (2) the associations of perceived usefulness, ease of use, data privacy and security protection, and perception of self as health-promoting role models to nurses’ own ePHR use, and (3) the moderating influences of age, chronic illness and medication use, and providers’ use of electronic health record (EHRs) on the associations between the ePHR acceptance constructs and ePHR use. Methods A convenience sample of registered nurses, those working in one of 12 hospitals in the Maryland and Washington, DC areas and members of the nursing informatics community (AMIA and HIMSS), were invited to respond to an anonymous online survey; 847 responded. Multiple logistic regression identified associations between the model constructs and ePHR use, and the moderating effect. Results Overall, ePHRs were used by 47%. Sufficient reliability for all scales was found. Three constructs were significantly related to nurses’ own ePHR use after adjusting for covariates: usefulness, data privacy and security protection, and health-promoting role model. Nurses with providers that used EHRs who perceived a higher level of data privacy and security protection had greater odds of ePHR use than those whose providers did not use EHRs. Older nurses with a higher self-perception as health-promoting role models had greater odds of ePHR use than younger nurses. Conclusions Nurses who use ePHRs for their personal health might promote adoption by the general public by serving as health-promoting role models. They can contribute to improvements in patient education and ePHR design, and serve as crucial resources when working with their

  4. 14. "SITE WORK, CIVIL, SITE PLAN." Test Area 1120. Specifications ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. "SITE WORK, CIVIL, SITE PLAN." Test Area 1-120. Specifications No. OC2-55-72; Drawing No. 60-09-12; sheet 7 of 148; file no. 1320/58, Rev. C. Stamped: RECORD DRAWING - AS CONSTRUCTED. Below stamp: Contract no. 4338 Rev. C, Date: 16 April 1957. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Leuhman Ridge near Highways 58 & 395, Boron, Kern County, CA

  5. 13. "CIVIL, SITE PLAN AND VICINITY MAP, AREA LOCATIONS." Test ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. "CIVIL, SITE PLAN AND VICINITY MAP, AREA LOCATIONS." Test Area 1-125. Specifications No. ENG (NASA)-04-35363-1; Drawing No. 60-09-34; sheet 11. Ref. No. C-l. D.O. SERIES 1597/1. Approved for siting on 24 April 1962. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Leuhman Ridge near Highways 58 & 395, Boron, Kern County, CA

  6. Analysis plan for 1985 large-scale tests. Technical report

    SciTech Connect

    McMullan, F.W.

    1983-01-01

    The purpose of this effort is to assist DNA in planning for large-scale (upwards of 5000 tons) detonations of conventional explosives in the 1985 and beyond time frame. Primary research objectives were to investigate potential means to increase blast duration and peak pressures. This report identifies and analyzes several candidate explosives. It examines several charge designs and identifies advantages and disadvantages of each. Other factors including terrain and multiburst techniques are addressed as are test site considerations.

  7. MIL-STD-398 Acceptance Test of Ammunition Peculiar Equipment (APE) 1974E002 Continuity Kit for M76 Grenade

    DTIC Science & Technology

    1990-02-01

    SMcAc.DEN C, 0 ! ). Savanna, IL 61074-9639 US ARMY ARMAMENT MUNITIONS EVALUATION DIVISION CHEMICAL COMMAND US ARMY DEFENSE AMMUNITION SAVANNA, ILLINOIS...USADACS). Evaluation Division (SMCAC-DEV), was tasked by the Equipment Division (SMCAC-DEN) to test the Ammunition Peculiar Equipment (APE) 1974E002...Equipment Division and approved by U.S. Army Materiel Command Field Safety Activity (AMCFSA). Charlestown, IN. The test plan defines the Maximum Credible

  8. Analytical method transfer using equivalence tests with reasonable acceptance criteria and appropriate effort: extension of the ISPE concept.

    PubMed

    Kaminski, L; Schepers, U; Wätzig, H

    2010-12-15

    A method development process is commonly finalized by a method transfer from the developing to the routine laboratory. Statistical tests are performed in order to survey if a transfer succeeded or failed. However, using the classic two-sample t-test can lead to misjudgments and unsatisfying transfer results due to its test characteristics. Therefore the International Society of Pharmaceutical Engineering (ISPE) employed a fixed method transfer design using equivalence tests in their Guide for Technology Transfer. Although it was well received by analytical laboratories worldwide this fixed design can easily bring about high beta-errors (rejection of successful transfers) or high workload (many analysts employed during transfer) if sigma(AN) (error due to different analysts) exceeds 0.6%. Hence this work introduces an extended concept which will help to circumvent this disadvantage by providing guidance to select a personalized and more appropriate experimental design. First of all it demonstrates that former t-test related acceptance criteria can be scaled by a factor of 1.15, which allows for a broader tolerance without a loss of decision certainty. Furthermore a decision guidance to choose the proper number of analysts or series at given percentage acceptance limits (%AL) is presented.

  9. Probabilistic Requirements (Partial) Verification Methods Best Practices Improvement. Variables Acceptance Sampling Calculators: Derivations and Verification of Plans. Volume 1

    NASA Technical Reports Server (NTRS)

    Johnson, Kenneth L.; White, K, Preston, Jr.

    2012-01-01

    The NASA Engineering and Safety Center was requested to improve on the Best Practices document produced for the NESC assessment, Verification of Probabilistic Requirements for the Constellation Program, by giving a recommended procedure for using acceptance sampling by variables techniques. This recommended procedure would be used as an alternative to the potentially resource-intensive acceptance sampling by attributes method given in the document. This document contains the outcome of the assessment.

  10. Project W-314 specific test and evaluation plan for transfer line SN-633 (241-AX-B to 241-AY-02A)

    SciTech Connect

    Hays, W.H.

    1998-03-20

    The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made by the addition of the SN-633 transfer line by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP). This STEP encompasses all testing activities required to demonstrate compliance to the project design criteria as it relates to the addition of transfer line SN-633. The Project Design Specifications (PDS) identify the specific testing activities required for the Project. Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the transfer line addition. The STEP will be utilized in conjunction with the TEP for verification and validation.

  11. Tank Monitor and Control System (TMACS) Rev 11.0 Acceptance Test Review

    SciTech Connect

    HOLM, M.J.

    1999-08-25

    The purpose of this document is to describe tests performed to validate Revision 11 of the TMACS Monitor and Control System (TMACS) and verify that the software functions as intended by design. This document is intended to test the software portion of TMACS. The tests will be performed on the development system. The software to be tested is the TMACS knowledge bases (KB) and the I/O driver/services. The development system will not be talking to field equipment; instead, the field equipment is simulated using emulators or multiplexers in the lab.

  12. Increasing the acceptability of HIV counseling and testing with three C's: convenience, confidentiality and credibility.

    PubMed

    Angotti, Nicole; Bula, Agatha; Gaydosh, Lauren; Kimchi, Eitan Zeev; Thornton, Rebecca L; Yeatman, Sara E

    2009-06-01

    Agencies engaged in humanitarian efforts to prevent the further spread of HIV have emphasized the importance of voluntary counseling and testing (VCT), and most high-prevalence countries now have facilities that offer testing free of charge. The utilization of these services is disappointingly low, however, despite high numbers reporting that they would like to be tested. Explanations of this discrepancy typically rely on responses to hypothetical questions posed in terms of psychological or social barriers; often, the explanation is that people fear learning that they are infected with a disease that they understand to be fatal and stigmatizing. Yet when we offered door-to-door rapid blood testing for HIV as part of a longitudinal study in rural Malawi, the overwhelming majority agreed to be tested and to receive their results immediately. Thus, in this paper, we ask: why are more people not getting tested? Using an explanatory research design, we find that rural Malawians are responsive to door-to-door HIV testing for the following reasons: it is convenient, confidential, and the rapid blood test is credible. Our study suggests that attention to these factors in VCT strategies may mitigate the fear of HIV testing, and ultimately increase uptake in rural African settings.

  13. Test plan for FY-94 digface characterization field experiments

    SciTech Connect

    Josten, N.E.; Roybal, L.G.

    1994-08-01

    The digface characterization concept has been under development at the Idaho National Engineering Laboratory (INEL) since fiscal year (FY) 1992 through the support of the Buried Waste Integrated Demonstration Program. A digface characterization system conducts continuous subsurface characterization simultaneously with retrieval of hazardous and radioactive waste from buried waste sites. The system deploys multiple sensors at the retrieval operation digface and collects data that provide a basis for detecting, locating, and classifying buried materials and hazardous conditions before they are disturbed by the retrieval equipment. This test plan describes ongoing efforts to test the digface characterization concept at the INEL`s Cold Test Pit using a simplified prototype deployment apparatus and off-the-shelf sensors. FY-94 field experiments will explore problems in object detection and classification. Detection and classification of objects are fundamental to three of the four primary functions of digface characterization during overburden removal. This test plan establishes procedures for collecting and validating the digface characterization data sets. Analysis of these data will focus on testing and further developing analysis methods for object detection and classification during overburden removal.

  14. Acid rain program: CEMS submission instructions for monitoring plans, certification test notifications, and quarterly reports

    SciTech Connect

    1995-05-12

    The Acid Rain Program regulations require all affected utility units to continuously measure, record and report SO2, NOx, volumetric flow data and CO2 emissions. All affected units also must continuously measure and record opacity, and must report opacity exceedances to the appropriate State or Local Agency. To ensure that your CEMS and fuel flowmeters are performing at an acceptable level, and providing quality assured data, you are required under 40 CFR 75.53, 75.62 (a) to submit a monitoring plan and certification test data for acid rain CEM certificaton. The purpose of this handbook is to help you fulfill your requirements under the Acid Rain Program. This handbook will walk you through the necessary steps for gaining CEMS certification, including filling out and mailing the proper forms, administering the required tests, and applying for certification and sending in electronic data to EPA.

  15. Fabrication Control Plan for ORNL RH-LOCA ATF Test Specimens to be Irradiated in the ATR

    SciTech Connect

    Field, Kevin G.; Howard, Richard; Teague, Michael

    2014-06-01

    The purpose of this fabrication plan is (1) to summarize the design of a set of rodlets that will be fabricated and then irradiated in the Advanced Test Reactor (ATR) and (2) provide requirements for fabrication and acceptance criteria for inspections of the Light Water Reactor (LWR) – Accident Tolerant Fuels (ATF) rodlet components. The functional and operational (F&OR) requirements for the ATF program are identified in the ATF Test Plan. The scope of this document only covers fabrication and inspections of rodlet components detailed in drawings 604496 and 604497. It does not cover the assembly of these items to form a completed test irradiation assembly or the inspection of the final assembly, which will be included in a separate INL final test assembly specification/inspection document. The controls support the requirements that the test irradiations must be performed safely and that subsequent examinations must provide valid results.

  16. Test plan for demonstration of Rapid Transuranic Monitoring Laboratory

    SciTech Connect

    McIsaac, C.V.; Sill, C.W.; Gehrke, R.J.; Killian, E.W.; Watts, K.D.

    1993-06-01

    This plan describes tests to demonstrate the capability of the Rapid Transuranic Monitoring Laboratory (RTML) to monitor airborne alpha-emitting radionuclides and analyze soil, smear, and filter samples for alpha- and gamma-emitting radionuclides under field conditions. The RTML will be tested during June 1993 at a site adjacent to the Cold Test Pit at the Radioactive Waste Management Complex at the Idaho National Engineering Laboratory. Measurement systems installed in the RTML that will be demonstrated include two large-area ionization chamber alpha spectrometers, an x-ray/gamma-ray spectrometer, and four alpha continuous air monitors. Test objectives, requirements for data quality, experimental apparatus and procedures, and safety and logistics issues are described.

  17. Acceptance test report for tank bottom thermocouples on Tank 241-SY-101

    SciTech Connect

    Zuehlke, A.C.

    1994-12-01

    This test report documents testing performed per WHC-SD-WM-ATP-069, Rev. 2. The proper monitoring of the 241-SY-101 Tank Bottom and Side Thermocouples (TBSTC) by the Data Acquisition and Control System (DACS) will be tested to establish continued operability of the system. During this test, an end-to-end verification of all of the sensor circuits associated with the TBSTCs, which provide signals both to the DACS computer system and an installed temporary Data Logger, shall be performed by injecting a signal at the appropriate field terminal and verifying the circuit completely through the system to the computer in the DACS trailer and the computer monitor used to display the output of the Data Logger. Each injected signal will be adjusted for appropriate `near zero`, `mid range` and `near full scale` values for the sensor being tested. The TBSTC screen, which provides for operator interface with the TBSTCs, will be utilized to monitor testing at the DACS computers. Testing per this procedure shall be conducted after the installation of the temporary Data Logger for the TBSTCs is complete. The temporary Data Logger will be installed to monitor the temperature readings of 13 of the 26 Tank Bottom Thermocouples in support of SY-101 excavation testing.

  18. 46 CFR 54.05-17 - Weld toughness test acceptance criteria.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... impact tests the energy absorbed in both the weld metal and heat affected zone impact tests in weld... required for the parent material. (2) For heat affected zone specimens, when the specimens are transversely oriented, not less than the transverse values required for the parent material. (3) For heat affected...

  19. 46 CFR 54.05-17 - Weld toughness test acceptance criteria.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Section 54.05-17 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING... impact tests the energy absorbed in both the weld metal and heat affected zone impact tests in weld qualification and production shall be: (1) For weld metal specimens, not less than the transverse...

  20. 46 CFR 54.05-17 - Weld toughness test acceptance criteria.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Section 54.05-17 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING... impact tests the energy absorbed in both the weld metal and heat affected zone impact tests in weld qualification and production shall be: (1) For weld metal specimens, not less than the transverse...

  1. 46 CFR 54.05-17 - Weld toughness test acceptance criteria.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Section 54.05-17 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING... impact tests the energy absorbed in both the weld metal and heat affected zone impact tests in weld qualification and production shall be: (1) For weld metal specimens, not less than the transverse...

  2. Acceptability of HIV/AIDS Counseling and Testing among Premarital Couples in China

    ERIC Educational Resources Information Center

    Wu, Zunyou; Rou, Keming; Xu, Chen; Lou, Wei; Detels, Roger

    2005-01-01

    Premarital counseling is required for couples wishing to be married in China. The counseling primarily provides information about contraception. We evaluated adding premarital HIV/AIDS counseling and voluntary HIV testing to the standard counseling. The test was offered free to one group and at the standard cost to the other. The proportion of…

  3. Field testing plan for unsaturated zone monitoring and field studies

    SciTech Connect

    Young, M.H.; Wierenga, P.J.; Warrick, A.W.

    1996-10-01

    The University of Arizona, in cooperation with the Bureau of Economic Geology at The University of Texas at Austin, and Stephens and Associates in Albuquerque, New Mexico has developed a field testing plan for evaluating subsurface monitoring systems. The U.S. Nuclear Regulatory Commission has requested development of these testing plans for low-level radioactive waste disposal sites (LLW) and for monitoring at decommissioned facilities designated under the {open_quotes}Site Decommissioning Management Plan{close_quotes} (SDMP). The tests are conducted on a 50 m by 50 m plot on the University of Arizona`s Maricopa Agricultural Center. Within the 50 m by 50 m plot one finds: (1) an instrumented buried trench, (2) monitoring islands similar to those proposed for the Ward Valley, California LLW Facility, (3) deep borehole monitoring sites, (4) gaseous transport monitoring, and (5) locations for testing non-invasive geophysical measurement techniques. The various subplot areas are instrumented with commercially available instruments such as neutron probes, time domain reflectometry probes, tensiometers, psychrometers, heat dissipation sensors, thermocouples, solution samplers, and cross-hole geophysics electrodes. Measurement depths vary from ground surface to 15 m. The data from the controlled flow and transport experiments, conducted over the plot, will be used to develop an integrated approach to long-term monitoring of the vadose zone at waste disposal sites. The data will also be used to test field-scale flow and transport models. This report describes in detail the design of the experiment and the methodology proposed for evaluating the data.

  4. Test plan and technical protocol for a field treatability test for bioventing

    SciTech Connect

    Hinchee, R.E.; Ong, S.K.; Miller, R.N.; Downey, D.C.; Frandt, R.

    1992-05-01

    Bioventing is an extremely cost-effective method for treating soils contaminated with fuels (JP-4, diesel, gasoline, and heating oil) and non-chlorinated solvents. In April of this year, the Air Force Center for Environmental Excellence (AFCEE) launched a nation-wide bioventing initiative to test the effectiveness of this innovative process at 55 contaminated sites in nineteen states. Twenty systems have already been installed and tested. To ensure that systems were installed and tested consistently, AFCEE developed the comprehensive protocol document. With minimal site specific modifications, the protocol is also used as a regulatory test plan. The concept significantly reduces test plan preparation costs. The AFCEE document introduces the bioventing technology and describes the technical procedures used to set up a bioventing system for field evaluation. It also provides testing, equipment, measurements, and other relevant quantitative data.

  5. TESTING INDOOR AIR PRODUCTS: ONE APPROACH TO DEVELOPING WIDELY ACCEPTED PROTOCOLS

    EPA Science Inventory

    The paper describes an approach to developing widely acce ted products for testing indoor air products. [NOTE: Research Triangle Institute (RTI) is a partner in the U.S. Environmental Protection Agency's (EPA's) Environmental Technology Verification (ETV) Program with responsibil...

  6. Acceptability testing of radioluminescent lights for VFR-night air taxi operations

    SciTech Connect

    Jensen, G.A.

    1985-01-01

    Tritium-powered radioluminescent (RL) lights have been under development for remote, austere, and tactical airfield lighting applications. The State of Alaska has requested FAA approval for use of the technology as a safe alternative lighting system to meet the airfield lighting needs of air taxi operations and general aviation in the state. The tests described in this report were performed by PNL for the DOE Defense Byproducts Production and Utilization Program. These tests are a step toward gaining the required approvals.

  7. Preliminary Recommendations for Improving the Construction and Acceptance Testing of Energy-Efficient Facilities.

    DTIC Science & Technology

    1986-06-01

    ductwork shall be leak tested in accordance with " SMACNA , Balancing and Adjustment of Air Distribution Systems." A maximum leakage of five percent of...constructed and joints shall be sealed as described in " SMACNA Low Pressure Duct Construction Standards." 19.4.3 High Pressure Ductwork: All ductwork...shall be tested in accordance with " SMACNA High Pressure Duct Construction Standards." This would include sealing of joints, hanging and supporting

  8. Identification and Development of Simple Acceptance Tests for MRE Film Pouch Materials

    DTIC Science & Technology

    2006-01-26

    obtained. These tests were performed under various conditions including temperature, backing material, rate, orientation, etc. Based on these...Such testing procedures would also allow the validation and approval of materials before their use in production, thereby preventing the loss of...delamination (i.e., better seal), then savings can be doubled. If the packaging material is non-foil based , there will be many more intangible

  9. En route noise of turboprop aircraft and their acceptability: Report of tests

    NASA Technical Reports Server (NTRS)

    Held, Wolf

    1990-01-01

    The development of propfan-powered aircraft has been observed with great interest. It is obvious that during cruising flight, the aircraft powerplant (propellers) cause a noise clearly perceivable on the ground. It is the audible frequency spectrum of the propfan powerplants relative to the high tip speeds that presents the problem. A flight test was conducted on 30 April, 1989 at the Frankfurt Airport. Results of the test flight are present.

  10. Evaluation of three soil toxicity tests used to monitor acceptable endpoints

    SciTech Connect

    Brinkmann, M.; Stroo, H.; Leuschner, A.; Leuteritz, D.; Stromberg, M.; Brourman, M.

    1995-12-31

    Three terrestrial toxicity tests were used to evaluate the efficacy of biological treatment of creosote and pentachlorophenol impacted soils at a Superfund site. Microtox, 5-day lettuce seed, and 14-day earthworm toxicity tests were performed on 10 soil samples at the beginning and end of 3 months of land treatment. Secondary endpoints of root length and earthworm weight loss were also evaluated. EC50 and LC50 values were calculated using a Trimmed Logit Statistical Program and compared to toxicity of 10 background samples collected from the site. Results for initial soils demonstrated toxicity with three of the five endpoints. End treatment results showed no measurable toxicity using all endpoints. Toxicity testing results are critical for obtaining regulatory approval for the full-scale treatment system. Post treatment closure requirements for the site will be based on bioassay results. Evaluation of the three tests used showed the Microtox test to be the most sensitive to this type of toxicity. Lettuce seed germination results were the least sensitive of the three primary endpoints chosen. Of the secondary endpoint criteria, root length demonstrated reliable EC50 values and showed toxicity trends similar to Microtox and earthworm tests. The earthworm weight loss endpoint was not a useful toxicity measurement at 14 days.

  11. Operations plan for the Regional Seismic Test Network

    SciTech Connect

    Not Available

    1981-05-15

    The Regional Seismic Test Network program was established to provide a capability for detection of extremely sensitive earth movements. Seismic signals from both natural and man-made earth motions will be analyzed with the ultimate objective of accurately locating underground nuclear explosions. The Sandia National Laboratories, Albuquerque, has designed an unattended seismic station capable of recording seismic information received at the location of the seismometers installed as part of that specific station. A network of stations is required to increase the capability of determining the source of the seismic signal and the location of the source. Current plans are to establish a five-station seismic network in the United States and Canada. The Department of Energy, Nevada Operations Office, has been assigned the responsibility for deploying, installing, and operating these remote stations. This Operation Plan provides the basic information and tasking to accomplish this assignment.

  12. Hanford Permanent Isolation Barrier Program: Asphalt technology test plan

    SciTech Connect

    Freeman, H.D.; Romine, R.A.

    1994-05-01

    The Hanford Permanent Isolation Barriers use engineered layers of natural materials to create an integrated structure with backup protective features. The objective of current designs is to develop a maintenance-free permanent barrier that isolates wastes for a minimum of 1000 years by limiting water drainage to near-zero amounts. Asphalt is being used as an impermeable water diversion layer to provide a redundant layer within the overall barrier design. Data on asphalt barrier properties in a buried environment are not available for the required 100-year time frame. The purpose of this test plan is to outline the activities planned to obtain data with which to estimate performance of the asphalt layers.

  13. Evaluation and Acceptability of a Simplified Test of Visual Function at Birth in a Limited-Resource Setting

    PubMed Central

    Carrara, Verena I.; Darakomon, Mue Chae; Thin, Nant War War; Paw, Naw Ta Kaw; Wah, Naw; Wah, Hser Gay; Helen, Naw; Keereecharoen, Suporn; Paw, Naw Ta Mlar; Jittamala, Podjanee; Nosten, François H.; Ricci, Daniela; McGready, Rose

    2016-01-01

    Neurological examination, including visual fixation and tracking of a target, is routinely performed in the Shoklo Malaria Research Unit postnatal care units on the Thailand-Myanmar border. We aimed to evaluate a simple visual newborn test developed in Italy and performed by non-specialized personnel working in neonatal care units. An intensive training of local health staff in Thailand was conducted prior to performing assessments at 24, 48 and 72 hours of life in healthy, low-risk term singletons. The 48 and 72 hours results were then compared to values obtained to those from Italy. Parents and staff administering the test reported on acceptability. One hundred and seventy nine newborns, between June 2011 and October 2012, participated in the study. The test was rapidly completed if the infant remained in an optimal behavioral stage (7 ± 2 minutes) but the test duration increased significantly (12 ± 4 minutes, p < 0.001) if its behavior changed. Infants were able to fix a target and to discriminate a colored face at 24 hours of life. Horizontal tracking of a target was achieved by 96% (152/159) of the infants at 48 hours. Circular tracking, stripe discrimination and attention to distance significantly improved between each 24-hour test period. The test was easily performed by non-specialized local staff and well accepted by the parents. Healthy term singletons in this limited-resource setting have a visual response similar to that obtained to gestational age matched newborns in Italy. It is possible to use these results as a reference set of values for the visual assessment in Karen and Burmese infants in the first 72 hours of life. The utility of the 24 hours test should be pursued. PMID:27300137

  14. Advanced Stirling Convertor Durability Testing: Plans and Interim Results

    NASA Technical Reports Server (NTRS)

    Meer, Dave; Oriti, Sal

    2012-01-01

    The U.S. Department of Energy (DOE), Lockheed Martin Corporation (LM), and NASA Glenn Research Center (GRC) have been developing the Advanced Stirling Radioisotope Generator (ASRG) for use as a power system for space science missions. In support of this program, NASA?s Glenn Research Center (GRC) has been involved in testing Stirling convertors, including the Advanced Stirling Convertor (ASC), for use in the ASRG. This testing includes electromagnetic interference/compatibility (EMI/EMC), structural dynamics, advanced materials, organics, and unattended extended operation. The purpose of the durability tests is to experimentally demonstrate the margins in the ASC design. Due to the high value of the hardware, previous ASC tests focused on establishing baseline performance of the convertors within the nominal operating conditions. The durability tests present the first planned extension of the operating conditions into regions beyond those intended to meet the product spec, where the possibility exists of lateral contact, overstroke, or over-temperature events. These tests are not intended to cause damage that would shorten the life of the convertors, so they can transition into extended operation at the conclusion of the tests. This paper describes the four tests included in the durability test sequence: 1) start/stop cycling, 2) exposure to constant acceleration in the lateral and axial directions, 3) random vibration at increased piston amplitude to induce contact events, and 4) overstroke testing to simulate potential failures during processing or during the mission life where contact events could occur. The paper also summarizes the analysis and simulation used to predict the results of each of these tests.

  15. Advanced Stirling Convertor Durability Testing: Plans and Interim Results

    NASA Technical Reports Server (NTRS)

    Meer, David W.; Oriti, Salvatore M.

    2012-01-01

    The U.S. Department of Energy (DOE), Lockheed Martin Corporation (LM), and NASA Glenn Research Center (GRC) have been developing the Advanced Stirling Radioisotope Generator (ASRG) for use as a power system for space science missions. In support of this program, GRC has been involved in testing Stirling convertors, including the Advanced Stirling Convertor (ASC), for use in the ASRG. This testing includes electromagnetic interference/compatibility (EMI/EMC), structural dynamics, advanced materials, organics, and unattended extended operation. The purpose of the durability tests is to experimentally demonstrate the margins in the ASC design. Due to the high value of the hardware, previous ASC tests focused on establishing baseline performance of the convertors within the nominal operating conditions. The durability tests present the first planned extension of the operating conditions into regions beyond those intended to meet the product spec, where the possibility exists of lateral contact, overstroke, or over-temperature events. These tests are not intended to cause damage that would shorten the life of the convertors, so they can transition into extended operation at the conclusion of the tests. This paper describes the four tests included in the durability test sequence: 1) start/stop cycling, 2) exposure to constant acceleration in the lateral and axial directions, 3) random vibration at increased piston amplitude to induce contact events, and 4) overstroke testing to simulate potential failures during processing or during the mission life where contact events could occur. The paper also summarizes the analysis and simulation used to predict the results of each of these tests.

  16. NPSAT1 MEMS 3-AXIS Rate Sensor Suite Performance, Characterization, and Flight Unit Acceptance Testing

    DTIC Science & Technology

    2011-09-01

    to -27°C Cooldown 27 1272475321 1272504689 TVAC1– 1b -27°C to +27°C Warmup 27 1272474371 1272531461 TVAC1– 2a -27°C to +27°C Warmup 28 1272571957...Hysteresis effect, warmup 204 1282667147 1282676304 Recirc1– 1a +25°C to +6°C Test Hysteresis effect, cooldown 239 1282948116 1282954713...Recirc1– 1b +6°C to +12°C Test Hysteresis effect, warmup 239 1282954717 1282955566 Recirc1– 2a +16°C to +6°C Cooldown 239 1282956386 1282959821

  17. 100 Area excavation treatability test plan. Revision 1

    SciTech Connect

    Not Available

    1993-08-01

    This test plan documents the requirements for a treatability study on field radionuclide analysis and dust control techniques. These systems will be used during remedial actions involving excavation. The data from this treatability study will be used to support the feasibility study (FS) process. Excavation is one of the high-priority, near-term, treatability study needs identified in the program plan (DOE-RL 1992f). Excavation of contaminated soils and buried solid wastes is included in several of the alternatives identified in the 100 Area FS. Although a common activity, excavation has only been used occasionally at the Hanford Site for waste removal applications. The most recent applications are excavation of the 618-9 burial ground and partial remediation of the 316-5 process trenches (DOE-RL 1992a, 1992b). Both projects included excavation of soil and dust control (using water sprays). Excavation is a well-developed technology and equipment is readily available; however, certain aspects of the excavation process require testing before use in full-scale operations. These include the following: Measurement and control of excavation-generated dust and airborne contamination; verification of field analytical system capabilities; demonstration of soil removal techniques specific to the 100 Area waste site types and configurations. The execution of this treatability test may produce up to 500 yd{sub 3} of contaminated soil, which will be used for future treatability tests. These tests may include soil washing with vitrification of the soil washing residuals. Other tests will be conducted if soil washing is not a viable alternative.

  18. TEST PLAN CHARACTERIZATION OF JET FORCES UPON WASTE TANK COMPONENTS

    SciTech Connect

    Bamberger, J. A.

    1992-01-01

    Westinghouse Hanford Company plans to install mixer pumps in double-shell waste tanks to mobilize and suspend settled sludge to allow eventual retrieval for treatment and permanent storage. The mixer pumps produce high momentum, horizontally directed jets that impact and mobilize the sludge and mix it into slurry for removal. There is concern that the force of the jet may damage tank internal components in its path. This test plan describes scaled experiments designed to characterize the velocity profiles of a near floor jet and to quantify the impact farces and drag coefficients of three tank components: radiation dry well, airlift circulator, and steam coil. The experiments will be conducted in water, at approximately 1/6-scale, using one stationary nozzle to simulate the jet. To measure and confirm the velocity profile of the free, submerged jet, the horizontal and vertical velocity profiles will be measured at several distances from the nozzle. The profile will also be measured after the jet impinges upon the tank floor to determine the·extent of the change in the profile caused by impingement. The jet forces upon the test articles will be measured at a maximum of four velocities and a variety of test article orientations. Each orientation will represent a unique position of the test article relative to the jet and the tank floor. In addition, the steam coil will be tested in three rotational orientations because it is not symmetric. The highest jet velocity will be selected so that the Reynolds number of the test article in the model will match that of the prototype when operating at design conditions. The forces measured upon the model components will be used to calculate the force on the prototype components using geometric scaling factors. In addition, the model force measurements will be used to calculate the component's drag coefficient as a function of the component Reynolds number.

  19. Acceptance of Genetic Testing for Hereditary Breast Ovarian Cancer Among Study Enrollees from an African American Kindred

    PubMed Central

    Simonsen, Sara Ellis; Baty, Bonnie Jeanne; Mandal, Diptasri; Neuhausen, Susan L; Seggar, Kate; Holubkov, Rich; Smith, Ken

    2008-01-01

    Clinical availability of genetic testing for cancer predisposition genes is generating a major challenge for U.S. health care systems to provide relevant genetic services to underserved populations. Here we present rates of study enrollment and utilization of genetic testing in a research study on BRCA1 testing acceptance in one large kindred. We also present data on baseline access to genetic information as well as enabling and obstructing factors to study enrollment. The study population included female and male members of an African-American kindred based in the rural southern United States with an identified BRCA1 mutation. A combination of quantitative and qualitative data were collected and analyzed. Of the 160 living, eligible and locatable kindred members, 105 (66%) enrolled in the study. Family, personal, and educational motivations were the most commonly endorsed reasons for study participation. The most commonly cited reasons for refusal to participate in the study were: lack of interest, time constraints, and negative experiences with prior participation in genetic research. Eighty three percent of the participants underwent BRCA1 testing. In multiple logistic regression analysis, age 40-49 (odds ratio (OR) = 6.9; 95% confidence interval (CI) = 1.2-39.5), increased perceived cancer risk (OR = 4.1; 95% CI = 1.1-14.6), and high cancer genetics knowledge levels (OR = 1.5; 95% CI = 1.1-2.3) were associated with BRCA1 testing acceptance. The results of this study indicate that cognitive and demographic factors may influence genetic research participation and genetic testing decisions among African Americans who are at increased risk of carrying a deleterious BRCA1 mutation. PMID:16523520

  20. Measuring Japanese EFL Student Perceptions of Internet-Based Tests with the Technology Acceptance Model

    ERIC Educational Resources Information Center

    Dizon, Gilbert

    2016-01-01

    The Internet has made it possible for teachers to administer online assessments with affordability and ease. However, little is known about Japanese English as a Foreign Language (EFL) students' attitudes of internet-based tests (IBTs). Therefore, this study aimed to measure the perceptions of IBTs among Japanese English language learners with the…

  1. Acceptance tests and their results for 1st Pre-Series Cryoline (PTCL) of ITER

    NASA Astrophysics Data System (ADS)

    Kapoor, H.; Garg, A.; Shah, N.; Muralidhara, S.; Choukekar, K.; Dash, B.; Gaur, V.; Madeenavalli, S.; Patel, P.; Kumar, U.; Jadon, M.; Shukla, V.; Sarkar, B.; Sarvaiya, Y.; Mukherjee, D.; Dutta, A.; Murugan, KV.; Gajera, S.; Joshi, B.; Panjwani, R.

    2017-02-01

    The Pre-Series Cryoline (PTCL) for ITER is a representative cryoline from the complicated network of all cryolines for the ITER project. It is ∼28 m in length with same cross-section (1:1) including main line (ML) and branch line (BL) as of ITER torus & cryostat cryoline. Geometrically; it has bends at different angles i.e. 90°, 120°, 135° & 160° comprising T-section & Z-section. The PTCL has been fabricated in 5 different elements based on the installation feasibility. The mechanical & instrumentation installation like sensors mounting, displacement sensors, etc. has been completed. The PTCL test has been performed after complete installation of PTCL and integration with the existing test facility at ITER-India cryogenics laboratory in order to verify the thermal performance and mechanical integrity. The primary objectives, which are evaluated during the PTCL test, are (i) Thermal performance of the PTCL (ii) Measurement of temperature profile on thermal shield of PTCL, (iii) Stress measurement at critical locations, (iv) Measurement of Outer Vacuum Jacket (OVJ) temperature during Break of Insulation Vacuum (BIV) test. The paper will summarize the methodology and observed results of PTCL.

  2. Accepting adoption's uncertainty: the limited ethics of pre-adoption genetic testing.

    PubMed

    Leighton, Kimberly J

    2014-06-01

    An increasing number of children are adopted in the United States from countries where both medical care and environmental conditions are extremely poor. In response to worries about the accuracy of medical histories, prospective adoptive parents increasingly request genetic testing of children prior to adoption. Though a general consensus on the ethics of pre-adoption genetic testing (PAGT) argues against permitting genetic testing on children available for adoption that is not also permitted for children in general, a view gaining traction argues for expanding the tests permitted. The reasoning behind this view is that the State has a duty to provide a child with parents who are the best "match," and thus all information that advances this end should be obtained. While the matching argument aims to promote the best interests of children, I show how it rests on the claim that what is in the best interests of children available for adoption is for prospective adoptive parents to have their genetic preferences satisfied such that the "genetics" of the children they end up adopting accurately reflects those preferences. Instead of protecting a vulnerable population, I conclude, PAGT contributes to the risks of harm such children face as it encourages people with strong genetic preferences to adopt children whose genetic backgrounds will always be uncertain.

  3. 241-AN-B pit leak detection ANA-WT-LDSTA-231 acceptance test procedure

    SciTech Connect

    VANDYKE, D.W.

    1999-08-25

    This document describes the method used to test design criteria for Safety Class, Intrinsically Safe leak detector system installed in 241-AN-B Valve Pit located at 200E Tank Farms. The purpose of this Procedure is to demonstrate that the pit leak detection relay cabinet and intrinsically safe probe circuit is fully operable.

  4. SN-268 encasement leak detection ANA-WT-LDSTA-335 acceptance test procedure

    SciTech Connect

    VANDYKE, D.W.

    1999-08-25

    This document describes the method used to test design criteria for encasement leak detector system installed in 241-AN-A Encasement Line SN-268, located at 200E Tank Farms. This procedure provides instructions for demonstrating that the pit leak detection relay cabinet and intrinsically safe probe circuit is fully operable.

  5. 241-AN-A pit leak detection ANA-WT-LDSTA-331 acceptance test procedure

    SciTech Connect

    VANDYKE, D.W.

    1999-08-25

    This document describes the method used to test design criteria for Safety Class, Intrinsically Safe leak detector system installed in 241-AN-A Valve Pit located at 200E Tank Farms. The purpose of this Procedure is to demonstrate that the pit leak detection relay cabinet and intrinsically safe probe circuit is fully operable.

  6. Selecting an acceptable and safe antibody detection test can present a dilemma.

    PubMed

    Combs, M R; Bredehoeft, S J

    2001-01-01

    The Transfusion Service at Duke University Hospital has changed antibody detection methods from the use of albumin in indirect antiglobulin tests to low-ionic-strength solution (LISS), and from LISS to polyethylene glycol (PEG) in an effort to enhance the rapid detection of clinically significant antibodies. In 1996, staffing issues required the consideration of automation. Although previous studies indicated that the gel test was not as sensitive as PEG for detection of clinically significant antibodies, we chose to implement the gel test to be used with the Tecan MegaFlex-ID. We performed a retrospective analysis of identified antibodies and transfusion reactions to compare the outcomes of one year's experience with gel and PEG. We found comparable detection of potentially clinically significant antibodies by both methods and significantly fewer unwanted or clinically insignificant antibodies detected with the use of gel. Fewer delayed serologic transfusion reactions and no transfusion-associated hemolytic events occurred in the year that gel was used. Although we initially found the selection of the gel test to be a dilemma, our ultimate decision appears to have successfully protected patient safety and balanced sensitivity with specificity.

  7. Acceptance testing report of Eductor System to be installed in the 105 K Basins

    SciTech Connect

    Packer, M.J.

    1996-04-25

    The Spent Nuclear Fuel (SNF) Project Engineering Support group cold-tested the Eductor System a 15 horsepower multi-stage centrifugal pump manufactured by the Grunfos Corporation with the housing manufactured and sold with the pump by the Tri-Nuclear Corporation and a 3-inch diameter water jet eductor manufactured by the Fox Valve Corporation. The Eductor System was tested to gather and document information to optimize sludge retrieval operations for use in the 105 K Basins. The cold-testing took place during February 12 through February 29, 1996 in the 305 Cold Test Facility basin located in the 300 area. The pump, utilized in conjunction with the eductor, makes up the core of the Eductor System. The pumping unit consists of a 15 hp stainless steel multi-stage centrifugal Grunfos pump which is seated in a stainless steel fabricated housing. Two baskets or filter elements make up part of the housing on the suction side of the pump. The pump can be used independent of the housing but the housing has two identified purposes. The first use is to stabilize the centrifugal pump and give the pneumatic valves and pump discharge piping a solid platform so the Eductor System can be more easily mobilized within the basin as one unit. The second use for the housing presents the option to utilize the suction-side filters for capturing larger fuel pieces after the smaller fines have been removed.

  8. 76 FR 27925 - Requirements for Maintenance of Inspections, Tests, Analyses, and Acceptance Criteria

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-13

    ... COMMISSION 10 CFR Parts 2 and 52 RIN 3150-AI77 Requirements for Maintenance of Inspections, Tests, Analyses... maintenance period. Most recently, the NRC held two public meetings in March 2010 to discuss draft proposed... provides guidance to verify licensees have implemented ITAAC maintenance programs to ensure that...

  9. TRUPACT-II Hydrogen G-Valve Program Test Plan

    SciTech Connect

    Mroz, Eugene J.

    1999-01-01

    This test plan describes the objectives, scope, participants, and components of the Transuranic Package Transporter-II (TRUPACT-II) Hydrogen G-Value Program (GH2P). The GH2P builds on the experience, results, and experimental setup of the TRUPACT-II Matrix Depletion Program (MDP) to establish effective hydrogen G-values (G-values) for additional waste matrices. This plan details the experimental design and test matrices for experiments to measure the G-value for additional waste matrices, including first- and second-stage sludges at the Idaho National Engineering and Environmental Laboratory, and molten salt extraction residues with varying amounts of residual moisture (i.e., unbound water). Data collected from the GH2P will be used to support an application to the US Nuclear Regulatory Commission for G-values and corresponding wattage limits for the TRUPACT-II payloads containing these waste matrices. The testing will also evaluate the ability to determine G-values on a waste stream basis.

  10. Updated FY12 Ceramic Fuels Irradiation Test Plan

    SciTech Connect

    Nelson, Andrew T.

    2012-05-24

    The Fuel Cycle Research and Development program is currently devoting resources to study of numerous fuel types with the aim of furthering understanding applicable to a range of reactors and fuel cycles. In FY11, effort within the ceramic fuels campaign focused on planning and preparation for a series of rabbit irradiations to be conducted at the High Flux Isotope Reactor located at Oak Ridge National Laboratory. The emphasis of these planned tests was to study the evolution of thermal conductivity in uranium dioxide and derivative compositions as a function of damage induced by neutron damage. Current fiscal realities have resulted in a scenario where completion of the planned rabbit irradiations is unlikely. Possibilities for execution of irradiation testing within the ceramic fuels campaign in the next several years will thus likely be restricted to avenues where strong synergies exist both within and outside the Fuel Cycle Research and Development program. Opportunities to augment the interests and needs of modeling, advanced characterization, and other campaigns present the most likely avenues for further work. These possibilities will be pursued with the hope of securing future funding. Utilization of synthetic microstructures prepared to better understand the most relevant actors encountered during irradiation of ceramic fuels thus represents the ceramic fuel campaign's most efficient means to enhance understanding of fuel response to burnup. This approach offers many of the favorable attributes embraced by the Separate Effects Testing paradigm, namely production of samples suitable to study specific, isolated phenomena. The recent success of xenon-imbedded thick films is representative of this approach. In the coming years, this strategy will be expanded to address a wider range of problems in conjunction with use of national user facilities novel characterization techniques to best utilize programmatic resources to support a science-based research program.

  11. Using Phased Array Ultrasonic Testing in Lieu of Radiography for Acceptance of Carbon Steel Piping Welds

    SciTech Connect

    Moran, Traci L.; Anderson, Michael T.; Cinson, Anthony D.; Crawford, Susan L.; Nove, Carol A.

    2014-08-01

    The Pacific Northwest National Laboratory (PNNL) is conducting studies for the U.S. Nuclear Regulatory Commission (NRC) to assess the capability, effectiveness, and reliability of ultrasonic testing (UT) as a replacement method for radiographic testing (RT) for volumetric examination of nuclear power plant (NPP) components. This particular study focused on evaluating the use of UT on carbon steel plate welds. Welding fabrication flaws included a combination of planar and volumetric types, e.g., incomplete fusion, lack of penetration, cracks, porosity, and slag inclusions. The examinations were conducted using phased-array (PA) UT techniques applied primarily for detection and flaw type characterization. This paper will discuss the results of using UT in lieu of RT for detection and classification of fabrication flaws in carbon steel plate welds.

  12. Design, fabrication and acceptance testing of a zero gravity whole body shower

    NASA Technical Reports Server (NTRS)

    Schumacher, E. A.; Lenda, J. A.

    1974-01-01

    Recent research and development programs have established the ability of the zero gravity whole body shower to maintain a comfortable environment in which the crewman can safely cleanse and dry the body. The purpose of this program was to further advance the technology of whole body bathing and to demonstrate technological readiness including in-flight maintenance by component replacement for flight applications. Three task efforts of this program are discussed. Conceptual designs and system tradeoffs were accomplished in task 1. Task 2 involved the formulation of preliminary and final designs for the shower, while task 3 included the fabrication and test of the shower assembly. Particular attention is paid to the evaluation and correction of test anomalies during the final phase of the program.

  13. The Fast Flux Test Facility shutdown program plan

    SciTech Connect

    Guttenberg, S.; Jones, D.H.; Midgett, J.C.; Nielsen, D.L.

    1995-01-01

    The Fast Flux Test Facility (FFTF) is a 400 MWt sodium-cooled research reactor owned by the US Department of Energy (DOE) and operated by the Westinghouse Hanford Company (WHC) on the Hanford Site in southeastern Washington State. The decision was made by the DOE in December, 1993, to initiate shutdown of the FFTF. This paper describes the FFTF Transition Project Plan (1) (formerly the FFTF Shutdown Program Plan) which provides the strategy, major elements, and project baseline for transitioning the FFTF to an industrially and radiologically safe shutdown condition. The Plan, and its resource loaded schedule, indicate this transition can be achieved in a period of six to seven years at a cost of approximately $359 million. The transition activities include reactor defueling, fuel offload to dry cask storage, sodium drain and reaction, management of sodium residuals, shutdown of auxiliary systems, and preparation of appropriate environmental and regulatory documentation. Completion of these activities will involve resolution of many challenging and unique issues associated with shutdown of a large sodium reactor facility. At the conclusion of these activities, the FFTF will be in a safe condition for turnover to the Hanford Site Environmental Restoration Contractor for a long term surveillance and maintenance phase and decommissioning.

  14. Report on the Final Acceptance Test for CTS (Computerized Training System). Addendum.

    DTIC Science & Technology

    2014-09-26

    nissed and lines were numbered incorrectly from thC -,’ .,. Softwazre Systems Element: SC Editor. Status: GTE-Sylvania 1-s Inv.eksti- ..... I, o em. .. 13...government wil I ppoirt et control len, His dit ~i.-s vii i-- I tidu: a.f-- Vr Auc t i n q thc ,e Ts I I n Cc(o diifnce w ith I h 0 test pI I.Delermining

  15. Physics Characterization of TLD-600 and TLD-700 and Acceptance Testing of New XRAD 160 Biological X-Ray Irradiator

    NASA Astrophysics Data System (ADS)

    Cao, Yanan

    2: Acceptance testing of new X-RAD 160 Biological X-Ray Irradiator. Purpose: An X-RAD 160 Biological X-Ray Irradiator was recently installed at Duke University to serve as a key device for cellular radiobiology research. The purpose of this study is to perform acceptance testing on the new irradiator for operator radiation safety and irradiation specifications. Methods: The acceptance testing included tests of the following components: (1) Leakage radiation survey, (2) Half-value layer (beam quality), (3) Uniformity, (4) KVp accuracy, (5) Exposure at varying mA (linearity of mA), (6) Exposure at varying kVp, (7) Inverse square measurements, (8) Field size measurement, (9) Exposure constancy. The irradiation parameters for each components of first round of acceptance testing performed on September 21, 2012 were: Leakage radiation survey (none, 160 kVp, 18 mA, 200s), Beam quality (40cm, 50-140 kVp in 10 kVp incensement, 1 mA, 10s, none), Uniformity (40cm, 160 kVp, 18 mA, 15s, F1), KVp accuracy (40cm, 50-150 kVp in 10 kVp incensement, 10 mA, 15s, none), Linearity of mA (40cm, 160 kVp, 2-18 mA, 15s, none), Inverse square measurements (20-63cm, 160 kVp, 1mA, 30s, none), Field size measurement (40cm, 160 kVp, 10 mA, 15s, none), Exposure constancy (40cm, 160 kVp, 18 mA, 20s, none). The irradiation parameters for each components for each components of second round of acceptance testing performed on November 18, 2012 were: Beam quality (40cm, 35-150 kVp, 1 mA, 10s, F1), KVp accuracy (40cm, 35-150 kVp, 1 mA, 10s, F1), Variation of kVp (40cm, 160 kVp, 18 mA, 30s, F1), Linearity of mA (40cm, 160 kVp, 1-18 mA, 30s, F1), Uniformity (40cm, 160 kVp, 18 mA, 30s, F1), Inverse square measurements (20-63cm, 160 kVp, 18 mA, 30s, F1). Results: The first round of acceptance testing performed on September 21, 2012 failed due to the fact that the measured exposure along the X-axis was significantly non-uniform; the exposure greatly decreases going in the left direction, which is a clear

  16. Factors associated with HIV-testing and acceptance of an offer of home-based testing by men in rural Zambia.

    PubMed

    Hensen, B; Lewis, J J; Schaap, A; Tembo, M; Mutale, W; Weiss, H A; Hargreaves, J; Ayles, H

    2015-03-01

    The objective of this study is to describe HIV-testing among men in rural Lusaka Province, Zambia, using a population-based survey for a cluster-randomized trial. Households (N = 120) were randomly selected from each of the 42 clusters, defined as a health facility catchment area. Individuals aged 15-60 years were invited to complete questionnaires regarding demographics and HIV-testing history. Men testing in the last year were defined as recent-testers. After questionnaire completion adults were offered home-based rapid HIV-testing. Of the 2,828 men, 53 % reported ever-testing and 25 % recently-testing. Factors independently associated with ever- and recent-testing included age 20+ years, secondary/higher education, being married or widowed, a history of TB-treatment and higher socioeconomic position. 53 % of never-testers and 57 % of men who did not report a recent-test accepted home-based HIV-testing. Current HIV-testing approaches are inadequate in this high prevalence setting. Alternative strategies, including self-testing, mobile- or workplace-testing, may be required to complement facility-based services.

  17. Acceptance Testing of a Satellite SCADA Photovoltaic-Diesel Hybrid System

    NASA Technical Reports Server (NTRS)

    Kalu, A.; Emrich, C.; Ventre, G.; Wilson, W.; Acosta, Roberto (Technical Monitor)

    2000-01-01

    Satellite Supervisory Control and Data Acquisition (SCADA) of a Photovoltaic (PV)/diesel hybrid system was tested using NASA's Advanced Communication Technology Satellite (ACTS) and Ultra Small Aperture Terminal (USAT) ground stations. The setup consisted of a custom-designed PV/diesel hybrid system, located at the Florida Solar Energy Center (FSEC), which was controlled and monitored at a "remote" hub via Ka-band satellite link connecting two 1/4 Watt USATs in a SCADA arrangement. The robustness of the communications link was tested for remote monitoring of the health and performance of a PV/diesel hybrid system, and for investigating load control and battery charging strategies to maximize battery capacity and lifetime, and minimize loss of critical load probability. Baseline hardware performance test results demonstrated that continuous two-second data transfers can be accomplished under clear sky conditions with an error rate of less than 1%. The delay introduced by the satellite (1/4 sec) was transparent to synchronization of satellite modem as well as to the PV/diesel-hybrid computer. End-to-end communications link recovery times were less than 36 seconds for loss of power and less than one second for loss of link. The system recovered by resuming operation without any manual intervention, which is important since the 4 dB margin is not sufficient to prevent loss of the satellite link during moderate to heavy rain. Hybrid operations during loss of communications link continued seamlessly but real-time monitoring was interrupted. For this sub-tropical region, the estimated amount of time that the signal fade will exceed the 4 dB margin is about 10%. These results suggest that data rates of 4800 bps and a link margin of 4 dB with a 1/4 Watt transmitter are sufficient for end-to-end operation in this SCADA application.

  18. 241-AN-B valve pit manifold valves and position indication acceptance test procedure

    SciTech Connect

    VANDYKE, D.W.

    1999-08-25

    This document describes the method used to test design criteria for gear actuated ball valves installed in 241-AN-B Valve Pit located at 200E Tank Farms. The purpose of this procedure is to demonstrate the following: Equipment is properly installed, labeled, and documented on As-Built drawings; New Manifold Valves in the 241-AN-B Valve Pit are fully operable using the handwheel of the valve operators; New valve position indicators on the valve operators will show correct valve positions; New valve position switches will function properly; and New valve locking devices function properly.

  19. 241-AN-A valve pit manifold valves and position indication acceptance test procedure

    SciTech Connect

    VANDYKE, D.W.

    1999-08-25

    This document describes the method used to test design criteria for gear actuated ball valves installed in 241-AN-A Valve Pit located at 200E Tank Farms. The purpose of this procedure is to demonstrate the following: Equipment is properly installed, labeled, and documented on As-Built drawings; New Manifold Valves in the 241-AN-A Valve Pit are fully operable using the handwheel of the valve operators; New valve position indicators on the valve operators will show correct valve positions; New valve position switches will function properly; and New valve locking devices function properly.

  20. Functional Equivalence Acceptance Testing of FUN3D for Entry Descent and Landing Applications

    NASA Technical Reports Server (NTRS)

    Gnoffo, Peter A.; Wood, William A.; Kleb, William L.; Alter, Stephen J.; Glass, Christopher E.; Padilla, Jose F.; Hammond, Dana P.; White, Jeffery A.

    2013-01-01

    The functional equivalence of the unstructured grid code FUN3D to the the structured grid code LAURA (Langley Aerothermodynamic Upwind Relaxation Algorithm) is documented for applications of interest to the Entry, Descent, and Landing (EDL) community. Examples from an existing suite of regression tests are used to demonstrate the functional equivalence, encompassing various thermochemical models and vehicle configurations. Algorithm modifications required for the node-based unstructured grid code (FUN3D) to reproduce functionality of the cell-centered structured code (LAURA) are also documented. Challenges associated with computation on tetrahedral grids versus computation on structured-grid derived hexahedral systems are discussed.